48 CFR 2052.211-70 - Preparation of technical reports.
Code of Federal Regulations, 2014 CFR
2014-10-01
....211-70 Preparation of technical reports. As prescribed at 2011.104-70(a), the contracting officer... Reports (JAN 1993) All technical reports required by Section C and all Technical Progress Reports required... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Preparation of technical...
48 CFR 2052.211-70 - Preparation of technical reports.
Code of Federal Regulations, 2012 CFR
2012-10-01
....211-70 Preparation of technical reports. As prescribed at 2011.104-70(a), the contracting officer... Reports (JAN 1993) All technical reports required by Section C and all Technical Progress Reports required... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Preparation of technical...
48 CFR 2052.211-70 - Preparation of technical reports.
Code of Federal Regulations, 2010 CFR
2010-10-01
....211-70 Preparation of technical reports. As prescribed at 2011.104-70(a), the contracting officer... Reports (JAN 1993) All technical reports required by Section C and all Technical Progress Reports required... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Preparation of technical...
48 CFR 2052.211-70 - Preparation of technical reports.
Code of Federal Regulations, 2013 CFR
2013-10-01
....211-70 Preparation of technical reports. As prescribed at 2011.104-70(a), the contracting officer... Reports (JAN 1993) All technical reports required by Section C and all Technical Progress Reports required... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Preparation of technical...
48 CFR 2052.211-70 - Preparation of technical reports.
Code of Federal Regulations, 2011 CFR
2011-10-01
....211-70 Preparation of technical reports. As prescribed at 2011.104-70(a), the contracting officer... Reports (JAN 1993) All technical reports required by Section C and all Technical Progress Reports required... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Preparation of technical...
32 CFR 203.17 - Technical assistance provider reporting requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 32 National Defense 2 2010-07-01 2010-07-01 false Technical assistance provider reporting requirements. 203.17 Section 203.17 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY... technical assistance provider shall submit progress reports, financial status reports, materials prepared...
32 CFR 203.17 - Technical assistance provider reporting requirements.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 32 National Defense 2 2014-07-01 2014-07-01 false Technical assistance provider reporting requirements. 203.17 Section 203.17 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY... technical assistance provider shall submit progress reports, financial status reports, materials prepared...
32 CFR 203.17 - Technical assistance provider reporting requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 32 National Defense 2 2013-07-01 2013-07-01 false Technical assistance provider reporting requirements. 203.17 Section 203.17 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY... technical assistance provider shall submit progress reports, financial status reports, materials prepared...
32 CFR 203.17 - Technical assistance provider reporting requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 32 National Defense 2 2011-07-01 2011-07-01 false Technical assistance provider reporting requirements. 203.17 Section 203.17 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY... technical assistance provider shall submit progress reports, financial status reports, materials prepared...
32 CFR 203.17 - Technical assistance provider reporting requirements.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 32 National Defense 2 2012-07-01 2012-07-01 false Technical assistance provider reporting requirements. 203.17 Section 203.17 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY... technical assistance provider shall submit progress reports, financial status reports, materials prepared...
47 CFR 18.207 - Technical report.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 47 Telecommunication 1 2013-10-01 2013-10-01 false Technical report. 18.207 Section 18.207... Applications and Authorizations § 18.207 Technical report. When required by the Commission a technical report...(s) under which the equipment is or will be marketed. (e) A statement of the rated technical...
47 CFR 18.207 - Technical report.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 47 Telecommunication 1 2014-10-01 2014-10-01 false Technical report. 18.207 Section 18.207... Applications and Authorizations § 18.207 Technical report. When required by the Commission a technical report...(s) under which the equipment is or will be marketed. (e) A statement of the rated technical...
47 CFR 18.207 - Technical report.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 47 Telecommunication 1 2012-10-01 2012-10-01 false Technical report. 18.207 Section 18.207... Applications and Authorizations § 18.207 Technical report. When required by the Commission a technical report...(s) under which the equipment is or will be marketed. (e) A statement of the rated technical...
48 CFR 35.010 - Scientific and technical reports.
Code of Federal Regulations, 2011 CFR
2011-10-01
... SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 35.010 Scientific and technical reports. (a) R&D contracts shall require contractors to furnish scientific and technical reports... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Scientific and technical...
48 CFR 35.010 - Scientific and technical reports.
Code of Federal Regulations, 2010 CFR
2010-10-01
... SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 35.010 Scientific and technical reports. (a) R&D contracts shall require contractors to furnish scientific and technical reports... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Scientific and technical...
48 CFR 35.010 - Scientific and technical reports.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Scientific and technical... SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 35.010 Scientific and technical reports. (a) R&D contracts shall require contractors to furnish scientific and technical reports...
48 CFR 35.010 - Scientific and technical reports.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Scientific and technical... SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 35.010 Scientific and technical reports. (a) R&D contracts shall require contractors to furnish scientific and technical reports...
48 CFR 35.010 - Scientific and technical reports.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Scientific and technical... SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 35.010 Scientific and technical reports. (a) R&D contracts shall require contractors to furnish scientific and technical reports...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-16
... Information Collection for Public Comment; McKinney-Vento Technical Assistance Narrative, Matrices, and... Narrative, Matrices, and Reporting Requirements. Description of the need for the information proposed: McKinney- Vento Technical Assistance (MV-TA) Narrative, Matrices, and Reporting Requirements will allow the...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-30
... Technical Barriers to Trade (2012 TBT Report) respectively. The TPSC invites written comments from the... Reports on Sanitary and Phytosanitary and Technical Barriers to Trade AGENCY: Office of the United States... (USTR) is required to publish annually the Reports on Sanitary and Phytosanitary and Technical Barriers...
1988-01-01
system requirements, design guidelines, and interface requirements has been prepared and included as Volume II of this Task 1 topical report. The Volume ...WAESD-TR-88-0002 Conceptual Design Of A Space-Based Multimegawatt MHD Power System ffA«kjjjjjTfc Task 1 Topical Report Volume I: Technical...Space-Based Multimegawatt MHD Power System: Task 1 Topical Report, Volume I: Technical Discussion Personal Author: Dana, RA. Corporate Author Or
30 CFR 777.13 - Reporting of technical data.
Code of Federal Regulations, 2010 CFR
2010-07-01
... descriptions of the methodology used to collect and analyze the data. (b) Technical analyses shall be planned... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Reporting of technical data. 777.13 Section 777... PROGRAMS GENERAL CONTENT REQUIREMENTS FOR PERMIT APPLICATIONS § 777.13 Reporting of technical data. (a) All...
High School Graduation Minimum Competency Requirements. Final Technical Report.
ERIC Educational Resources Information Center
Austin Independent School District, TX. Office of Research and Evaluation.
This technical report details the testing results and analyses supporting the evaluation findings related to the Austin (Texas) Independent School District (AISD) minimum competency graduation requirements. The graduation competency status of all AISD students in grades 8 to 12 are documented. The report provides additional information on the data…
ERIC Educational Resources Information Center
Savage, Gerald J.; Seible, Marcea K.
2010-01-01
This article reports a study of internship requirements in technical communication programs compared with three established professions and one emerging profession that have certification or licensing requirements for practitioners. The study addresses three questions about technical communication internship programs: 1) Are internships offered as…
48 CFR 742.1170-4 - Progress reporting requirements and contract clause.
Code of Federal Regulations, 2010 CFR
2010-10-01
... progress. (b) Because the cognizant technical officer is the individual most familiar with the contractor's performance, the contractor must submit the progress reports directly to the cognizant technical officer. The cognizant technical officer must review the reports and advise the contracting officer, in writing, of any...
30 CFR 777.13 - Reporting of technical data.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Reporting of technical data. 777.13 Section 777.13 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR... PROGRAMS GENERAL CONTENT REQUIREMENTS FOR PERMIT APPLICATIONS § 777.13 Reporting of technical data. (a) All...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Giaddui, T; Chen, W; Yu, J
2014-06-15
Purpose: To review IGRT credentialing experience and unexpected technical issues encountered in connection with advanced radiotherapy technologies as implemented in RTOG clinical trials. To update IGRT credentialing procedures with the aim of improving the quality of the process, and to increase the proportion of IGRT credentialing compliance. To develop a living disease site-specific IGRT encyclopedia. Methods: Numerous technical issues were encountered during the IGRT credentialing process. The criteria used for credentialing review were based on: image quality; anatomy included in fused data sets and shift results. Credentialing requirements have been updated according to the AAPM task group reports for IGRTmore » to ensure that all required technical items are included in the quality review process. Implementation instructions have been updated and expanded for recent protocols. Results: Technical issues observed during the credentialing review process include, but are not limited to: poor quality images; inadequate image acquisition region; poor data quality; shifts larger than acceptable; no soft tissue surrogate. The updated IGRT credentialing process will address these issues and will also include the technical items required from AAPM: TG 104; TG 142 and TG 179 reports. An instruction manual has been developed describing a remote credentialing method for reviewers. Submission requirements are updated, including images/documents as well as facility questionnaire. The review report now includes summary of the review process and the parameters that reviewers check. We have reached consensus on the minimum IGRT technical requirement for a number of disease sites. RTOG 1311(NRG-BR002A Phase 1 Study of Stereotactic Body Radiotherapy (SBRT) for the Treatment of Multiple Metastases) is an example, here; the protocol specified the minimum requirement for each anatomical sites (with/without fiducials). Conclusion: Technical issues are identified and reported. IGRT guidelines are updated, with the corresponding credentialing requirements. An IGRT encyclopedia describing site-specific implementation issues is currently in development.« less
NATO Scientific and Technical Information Service (NSTIS): functional description. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Molholm, K.N.; Blados, W.N.; Bulca, C.
1987-08-01
This report provides a functional description of the requirements for a NATO Scientific and Technical Information Service (NSTIS). The user requirements and much of the background information in this report were derived primarily from interviews with more than 60 NATO Headquarters staff members between 2 March and 25 March 1987. In addition, representatives of the Supreme Headquarters Applied Powers Europe (SHAPE) Technical Centre (STC), the Supreme Allied Commander Atlantic (Anti-Submarine Warfare Research) Centre (SACLANTCEN), the NATO Communications and Information Systems Agency (NACISA), The Advisory Group for Aerospace Research and Development (AGARD), the U.S. Defense Technical Information Center (DTIC), and themore » Technical Documentation Center for the Armed Forces in the Netherlands (TDCK), were interviewed, either in person or by telephone.« less
10 CFR 52.157 - Contents of applications; technical information in final safety analysis report.
Code of Federal Regulations, 2013 CFR
2013-01-01
...; technical information in final safety analysis report. The application must contain a final safety analysis...) Information sufficient to demonstrate compliance with the applicable requirements regarding testing, analysis... 10 Energy 2 2013-01-01 2013-01-01 false Contents of applications; technical information in final...
10 CFR 52.157 - Contents of applications; technical information in final safety analysis report.
Code of Federal Regulations, 2012 CFR
2012-01-01
...; technical information in final safety analysis report. The application must contain a final safety analysis...) Information sufficient to demonstrate compliance with the applicable requirements regarding testing, analysis... 10 Energy 2 2012-01-01 2012-01-01 false Contents of applications; technical information in final...
10 CFR 52.157 - Contents of applications; technical information in final safety analysis report.
Code of Federal Regulations, 2014 CFR
2014-01-01
...; technical information in final safety analysis report. The application must contain a final safety analysis...) Information sufficient to demonstrate compliance with the applicable requirements regarding testing, analysis... 10 Energy 2 2014-01-01 2014-01-01 false Contents of applications; technical information in final...
10 CFR 52.157 - Contents of applications; technical information in final safety analysis report.
Code of Federal Regulations, 2011 CFR
2011-01-01
...; technical information in final safety analysis report. The application must contain a final safety analysis...) Information sufficient to demonstrate compliance with the applicable requirements regarding testing, analysis... 10 Energy 2 2011-01-01 2011-01-01 false Contents of applications; technical information in final...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Young, T.E.; Magleby, E.H.
1985-09-06
A review was performed of reports required by federal regulations and the plant-specific radiological effluent technical specifications (RETS) for operations conducted at Tennessee Valley Authority's Browns Ferry Nuclear Station, Units 1, 2, and 3, during 1983. The two periodic reports reviewed were (a) the Effluents and Waste Disposal Semiannual Report, First Half 1983 and (b) the Effluents and Waste Disposal Semiannual Report, Second Half 1983. The principal review guidelines were the plant's specific RETs and NRC guidance given in NUREG-0133, ''Preparation of Radiological Effluent Technical Specifications for Nuclear Power Plants.'' The Licensee's submitted reports were found to be reasonably completemore » and consistent with the review guidelines.« less
DOT National Transportation Integrated Search
1975-08-01
This report outlines the engineering requirements for an Airborne Laser Remote Sensor for Oil Detection and Classification System. Detailed engineering requirements are given for the major units of the system. Technical considerations pertinent to a ...
ERIC Educational Resources Information Center
Los Angeles Regional Technical Information Users Council, CA.
Nine reports of the Los Angeles Regional Technical Information Users Council, which identify and discuss user problem areas and recommend solutions, comprise this document. The topics of the reports are: (1) Air Force Technical Objective Document Release Program (AFTOD); (2) Army Qualitative Requirements Information Program (QDRI); (3)…
Programs of Study: Year 2 Joint Technical Report. Research Snapshot
ERIC Educational Resources Information Center
National Research Center for Career and Technical Education, 2010
2010-01-01
In January 2010, the National Research Center for Career and Technical Education (NRCCTE) issued a progress report on three studies being conducted by the Center that examine the implementation and outcomes of Programs of Study (POS), which were required in the 2006 reauthorization of the federal legislation for career and technical education…
DOT National Transportation Integrated Search
2017-11-01
This report is one of two NCST Research Report documents produced as part of a project to advance the technical modeling tools for resiliency and adaptation planning, especially those used for criticality rankings. The official final technical report...
32 CFR 202.13 - Technical assistance for public participation.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Reporting Requirements § 202.13 Technical assistance for public participation. Community members of a RAB or TRC may request technical assistance for interpreting scientific and engineering issues with regard to...
48 CFR 952.242-70 - Technical direction.
Code of Federal Regulations, 2011 CFR
2011-10-01
.... (3) Reviewing and, where required by the contract, approving, technical reports, drawings... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Technical direction. 952... FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 952.242-70 Technical...
48 CFR 952.242-70 - Technical direction.
Code of Federal Regulations, 2012 CFR
2012-10-01
.... (3) Reviewing and, where required by the contract, approving, technical reports, drawings... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Technical direction. 952... FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 952.242-70 Technical...
48 CFR 952.242-70 - Technical direction.
Code of Federal Regulations, 2014 CFR
2014-10-01
.... (3) Reviewing and, where required by the contract, approving, technical reports, drawings... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Technical direction. 952... FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 952.242-70 Technical...
48 CFR 952.242-70 - Technical direction.
Code of Federal Regulations, 2013 CFR
2013-10-01
.... (3) Reviewing and, where required by the contract, approving, technical reports, drawings... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Technical direction. 952... FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 952.242-70 Technical...
76 FR 5473 - Technical Corrections to the TTB Regulations
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-01
..., Reporting and recordkeeping requirements, Spices and flavorings, Surety bonds, Virgin Islands. Part 18 Alcohol and alcoholic beverages, Fruits, Reporting and recordkeeping requirements, Spices and flavorings..., Reporting and recordkeeping requirements, Research, Scientific equipment, Spices and flavorings, Surety...
48 CFR 1435.010 - Scientific and technical reports.
Code of Federal Regulations, 2010 CFR
2010-10-01
... SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 1435.010 Scientific and technical reports. If a Research and Development (R&D) contract results involve classified or national security... available. Copies of publications and reports are also required to be sent to the DOI Departmental Library...
48 CFR 1435.010 - Scientific and technical reports.
Code of Federal Regulations, 2013 CFR
2013-10-01
... SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 1435.010 Scientific and technical reports. If a Research and Development (R&D) contract results involve classified or national security... available. Copies of publications and reports are also required to be sent to the DOI Departmental Library...
48 CFR 1435.010 - Scientific and technical reports.
Code of Federal Regulations, 2011 CFR
2011-10-01
... SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 1435.010 Scientific and technical reports. If a Research and Development (R&D) contract results involve classified or national security... available. Copies of publications and reports are also required to be sent to the DOI Departmental Library...
48 CFR 1435.010 - Scientific and technical reports.
Code of Federal Regulations, 2012 CFR
2012-10-01
... SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 1435.010 Scientific and technical reports. If a Research and Development (R&D) contract results involve classified or national security... available. Copies of publications and reports are also required to be sent to the DOI Departmental Library...
48 CFR 1435.010 - Scientific and technical reports.
Code of Federal Regulations, 2014 CFR
2014-10-01
... SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 1435.010 Scientific and technical reports. If a Research and Development (R&D) contract results involve classified or national security... available. Copies of publications and reports are also required to be sent to the DOI Departmental Library...
75 FR 43400 - Technical Corrections to Commission's Regulations
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-26
..., Electric power, Natural gas, Pipelines, Reporting and recordkeeping requirements. 18 CFR Part 3b Privacy..., Holding companies, Reporting and recordkeeping requirements. 18 CFR Part 152 Natural gas, Reporting and recordkeeping requirements. 18 CFR Part 153 Exports, Imports, Natural gas, Reporting and recordkeeping...
48 CFR 935.010 - Scientific and technical reports.
Code of Federal Regulations, 2013 CFR
2013-10-01
... information. The DOE Order 241.1B Scientific and Technical Information Management, or its successor version... conveyed in scientific and technical information (STI) shall include an instruction requiring the.... Department of Energy (DOE), Office of Scientific and Technical Information (OSTI), using the DOE Energy Link...
48 CFR 935.010 - Scientific and technical reports.
Code of Federal Regulations, 2011 CFR
2011-10-01
... information. The DOE Order 241.1B Scientific and Technical Information Management, or its successor version... conveyed in scientific and technical information (STI) shall include an instruction requiring the.... Department of Energy (DOE), Office of Scientific and Technical Information (OSTI), using the DOE Energy Link...
48 CFR 935.010 - Scientific and technical reports.
Code of Federal Regulations, 2010 CFR
2010-10-01
... information. The DOE Order 241.1B Scientific and Technical Information Management, or its successor version... conveyed in scientific and technical information (STI) shall include an instruction requiring the.... Department of Energy (DOE), Office of Scientific and Technical Information (OSTI), using the DOE Energy Link...
48 CFR 935.010 - Scientific and technical reports.
Code of Federal Regulations, 2012 CFR
2012-10-01
... information. The DOE Order 241.1B Scientific and Technical Information Management, or its successor version... conveyed in scientific and technical information (STI) shall include an instruction requiring the.... Department of Energy (DOE), Office of Scientific and Technical Information (OSTI), using the DOE Energy Link...
48 CFR 935.010 - Scientific and technical reports.
Code of Federal Regulations, 2014 CFR
2014-10-01
... information. The DOE Order 241.1B Scientific and Technical Information Management, or its successor version... conveyed in scientific and technical information (STI) shall include an instruction requiring the.... Department of Energy (DOE), Office of Scientific and Technical Information (OSTI), using the DOE Energy Link...
1975-12-01
139 APPENDIX A* BASIC CONCEPT OF MILITARY TECHNICAL CONTROL.142 6 APIENDIX Es TEST EQUIPMENI REQUIRED FOR lEASURF.4ENr OF 1AF’AMETE RS...Control ( SATEC ) Automatic Facilities heport Army Automated Quality Monitoring Reporting System (AQMPS) Army Autcmated Technical Control-Semi (ATC-Semi...technical control then beco.. es equipment status monitoring. All the major equipment in a system wculd have internal sensors with properly selected parameters
48 CFR 2052.215-71 - Project officer authority.
Code of Federal Regulations, 2012 CFR
2012-10-01
... of the work description. (3) Review and, where required by the contract, approve technical reports... subject to the technical direction of the NRC project officer. The term technical direction is defined to include the following: (1) Technical direction to the contractor which shifts work emphasis between areas...
48 CFR 2052.215-71 - Project officer authority.
Code of Federal Regulations, 2011 CFR
2011-10-01
... of the work description. (3) Review and, where required by the contract, approve technical reports... subject to the technical direction of the NRC project officer. The term technical direction is defined to include the following: (1) Technical direction to the contractor which shifts work emphasis between areas...
48 CFR 2052.215-71 - Project officer authority.
Code of Federal Regulations, 2013 CFR
2013-10-01
... of the work description. (3) Review and, where required by the contract, approve technical reports... subject to the technical direction of the NRC project officer. The term technical direction is defined to include the following: (1) Technical direction to the contractor which shifts work emphasis between areas...
48 CFR 2052.215-71 - Project officer authority.
Code of Federal Regulations, 2014 CFR
2014-10-01
... of the work description. (3) Review and, where required by the contract, approve technical reports... subject to the technical direction of the NRC project officer. The term technical direction is defined to include the following: (1) Technical direction to the contractor which shifts work emphasis between areas...
37 CFR 401.13 - Administration of patent rights clauses.
Code of Federal Regulations, 2013 CFR
2013-07-01
... in government or other publications of technical reports of contractors or others. In recognition of... invention to the extent such materials were provided as part of a technical report or other submission of... disclosure, patent applications, and utilization reports required in performance or in consequence of awards...
37 CFR 401.13 - Administration of patent rights clauses.
Code of Federal Regulations, 2011 CFR
2011-07-01
... in government or other publications of technical reports of contractors or others. In recognition of... invention to the extent such materials were provided as part of a technical report or other submission of... disclosure, patent applications, and utilization reports required in performance or in consequence of awards...
37 CFR 401.13 - Administration of patent rights clauses.
Code of Federal Regulations, 2014 CFR
2014-07-01
... in government or other publications of technical reports of contractors or others. In recognition of... invention to the extent such materials were provided as part of a technical report or other submission of... disclosure, patent applications, and utilization reports required in performance or in consequence of awards...
37 CFR 401.13 - Administration of patent rights clauses.
Code of Federal Regulations, 2012 CFR
2012-07-01
... in government or other publications of technical reports of contractors or others. In recognition of... invention to the extent such materials were provided as part of a technical report or other submission of... disclosure, patent applications, and utilization reports required in performance or in consequence of awards...
75 FR 48743 - Mandatory Reporting of Greenhouse Gases
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-11
...EPA is proposing to amend specific provisions in the GHG reporting rule to clarify certain provisions, to correct technical and editorial errors, and to address certain questions and issues that have arisen since promulgation. These proposed changes include providing additional information and clarity on existing requirements, allowing greater flexibility or simplified calculation methods for certain sources in a facility, amending data reporting requirements to provide additional clarity on when different types of GHG emissions need to be calculated and reported, clarifying terms and definitions in certain equations, and technical corrections.
75 FR 79091 - Mandatory Reporting of Greenhouse Gases
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-17
...EPA is amending specific provisions in the greenhouse gas reporting rule to clarify certain provisions, to correct technical and editorial errors, and to address certain questions and issues that have arisen since promulgation. These final changes include generally providing additional information and clarity on existing requirements, allowing greater flexibility or simplified calculation methods for certain sources, amending data reporting requirements to provide additional clarity on when different types of greenhouse gas emissions need to be calculated and reported, clarifying terms and definitions in certain equations and other technical corrections and amendments.
ERIC Educational Resources Information Center
US Department of Education, 2004
2004-01-01
The Carl D. Perkins Vocational and Technical Education Act of 1998 (Perkins III) requires, in Section 113(c)(3)(C), that the Secretary provide the appropriate committees of Congress copies of annual reports received by the Department from each eligible agency that receives funds under the Act. Section 113(c)(3)(a) further requires the Secretary…
NASA Technical Reports Server (NTRS)
1993-01-01
This is the Final Technical Report for the NetView Technical Research task. This report is prepared in accordance with Contract Data Requirements List (CDRL) item A002. NetView assistance was provided and details are presented under the following headings: NetView Management Systems (NMS) project tasks; WBAFB IBM 3090; WPAFB AMDAHL; WPAFB IBM 3084; Hill AFB; McClellan AFB AMDAHL; McClellan AFB IBM 3090; and Warner-Robins AFB.
ERIC Educational Resources Information Center
United Nations Educational, Scientific, and Cultural Organization, Paris (France).
This monograph includes the final report of the International Expert Meeting on the Promotion of Equal Access of Girls and Women to Technical and Vocational Education (TVE) held in Seoul, Republic of Korea, and country discussion papers. The final report is composed of an introduction that proposes that many Member States require special measures…
Improved self-contained breathing apparatus concept. Final report Oct 80-Jun 82
DOE Office of Scientific and Technical Information (OSTI.GOV)
White, L.; Walker, J.
1982-08-01
Past operational experiences of USAF fire fighting and rescue teams have indicated the need for an improved self-contained breathing apparatus (SCBA). In October 1980, a contract was awarded to Electronic Data Systems, Panama City, Florida, to design and develop a prototype SCBA that would meet Air Force technical requirements. A prototype was designed, developed, and tested through a subcontract with Reimers Consultants, Falls Church, Virginia. This report describes the technical requirements, a detailed technical description of the unit, and the unmanned test procedures and results. The unmanned testing demonstrate that the prototype SCBA meets all performance requirements, except for weight.more » The fully charged prototype weights 34 pounds, the maximum acceptable weight is 30 pounds. With the other performance requirements either met or exceeded, manned testing of the SCBA can proceed.« less
21 CFR 312.31 - Information amendments.
Code of Federal Regulations, 2011 CFR
2011-04-01
... reports, or annual report. Examples of information requiring an information amendment include: (1) New toxicology, chemistry, or other technical information; or (2) A report regarding the discontinuance of a... Information amendments. (a) Requirement for information amendment. A sponsor shall report in an information...
Overview of Energy Systems` safety analysis report programs. Safety Analysis Report Update Program
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-03-01
The primary purpose of an Safety Analysis Report (SAR) is to provide a basis for judging the adequacy of a facility`s safety. The SAR documents the safety analyses that systematically identify the hazards posed by the facility, analyze the consequences and risk of potential accidents, and describe hazard control measures that protect the health and safety of the public and employees. In addition, some SARs document, as Technical Safety Requirements (TSRs, which include Technical Specifications and Operational Safety Requirements), technical and administrative requirements that ensure the facility is operated within prescribed safety limits. SARs also provide conveniently summarized information thatmore » may be used to support procedure development, training, inspections, and other activities necessary to facility operation. This ``Overview of Energy Systems Safety Analysis Report Programs`` Provides an introduction to the programs and processes used in the development and maintenance of the SARs. It also summarizes some of the uses of the SARs within Energy Systems and DOE.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1997-11-01
This study, conducted by Black & Veatch, was funded by the U.S. Trade and Development Agency. The report, produced for the Ministry of National Resources, Energy and Environment (MNRE) of Swaziland, determines the least cost capacity expansion option to meet the future power demand and system reliability criteria of Swaziland, with particular emphasis on the proposed Interconnector between Swaziland and Mozambique. Volume 3 contains EPC Specifications and is divided into the following divisions: (1) Commercial; (2) General Technical Requirements; (3) Transmission Line Technical Requirements; (4) Substation Technical Requirements; (5) Specifications.
NASA Technical Reports Server (NTRS)
1995-01-01
The purpose of the Advanced Transportation System Studies (ATSS) Technical Area 2 (TA-2) Heavy Lift Launch Vehicle Development contract was to provide advanced launch vehicle concept definition and analysis to assist NASA in the identification of future launch vehicle requirements. Contracted analysis activities included vehicle sizing and performance analysis, subsystem concept definition, propulsion subsystem definition (foreign and domestic), ground operations and facilities analysis, and life cycle cost estimation. This document is Volume 2 of the final report for the contract. It provides documentation of selected technical results from various TA-2 analysis activities, including a detailed narrative description of the SSTO concept assessment results, a user's guide for the associated SSTO sizing tools, an SSTO turnaround assessment report, an executive summary of the ground operations assessments performed during the first year of the contract, a configuration-independent vehicle health management system requirements report, a copy of all major TA-2 contract presentations, a copy of the FLO launch vehicle final report, and references to Pratt & Whitney's TA-2 sponsored final reports regarding the identification of Russian main propulsion technologies.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kriger, A.
1978-01-31
This report is a part of the interim report documentation for the Global Spent Fuel Logistics System (GSFLS) study. The technical and financial considerations underlying a global spent fuel logistics systems have been studied and are reported. The Pacific Basin is used as a model throughout this report; however the stated methodology and, in many cases, considerations and conclusions are applicable to other global regions. Spent fuel discharge profiles for Pacific Basin Countries were used to determine the technical systems requirements for alternative concepts. Functional analyses and flows were generated to define both system design requirements and logistics parameters. Amore » technology review was made to ascertain the state-of-the-art of relevant GSFLS technical systems. Modular GSFLS facility designs were developed using the information generated from the functional analysis and technology review. The modular facility designs were used as a basis for siting and cost estimates for various GSFLS alternatives. Various GSFLS concepts were analyzed from a financial and economic perspective in order to provide total concepts costs and ascertain financial and economic sensitivities to key GSFLS variations. Results of the study include quantification of GSFLS facility and hardware requirements; drawings of relevant GSFLS facility designs; system cost estimates; financial reports - including user service charges; and comparative analyses of various GSFLS alternatives.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-20
... reporting requirements. Changes: None. Focus TA on Assessment and Discipline Data Comment: Three commenters agreed with the importance of focusing on assessment and discipline data, and two commenters agreed with... decisions and actions associated with data collection and reporting. One commenter stated that assessment...
ERIC Educational Resources Information Center
DOBROVOLNY, JERRY S.
THIS REPORT ATTEMPTS TO SHOW ADMINISTRATORS OF JUNIOR COLLEGES, TECHNICAL INSTITUTES, AND GOVERNMENT OR INDUSTRIAL TRAINING PROGRAMS CERTAIN CRITICAL PROBLEMS IN THE TRAINING OF CIVIL ENGINEERING TECHNICIANS. THE PHILOSOPHY OF TECHNICAL EDUCATION REQUIRES ATTENTION AS DOES THE IDENTIFICATION OF STUDENTS WHO CAN BENEFIT FROM AND SUCCESSFULLY…
2015-2016 Florida Adult Education Assessment Technical Assistance Paper
ERIC Educational Resources Information Center
Florida Department of Education, 2016
2016-01-01
This technical assistance paper provides guidance to individuals with test administration responsibilities in adult education programs. These policies apply to the approved assessments that programs may use to report educational gains in compliance with the National Reporting System (NRS) requirements. The NRS is the accountability system for the…
2016-2017 Florida Adult Education Assessment Technical Assistance Paper
ERIC Educational Resources Information Center
Florida Department of Education, 2017
2017-01-01
This technical assistance paper provides guidance to individuals with test administration responsibilities in adult education programs. These policies apply to the approved assessments that programs may use to report educational gains in compliance with the National Reporting System (NRS) requirements. The NRS is the accountability system for the…
NASA Publications Guide for Authors. Revised
NASA Technical Reports Server (NTRS)
2005-01-01
This document presents guidelines for use by NASA authors for preparing and publishing their scientific and technical information (STI). Section 1 gives an overview. Section 2 describes each type of report in the NASA STI Report Series and other forms of publications. It also discusses dissemination and safeguarding of STI. Section 3 gives technical, data quality, and dissemination reviews, including the mandatory review via NASA Form 1676, NASA Scientific and Technical Information (STI) Document Availability Authorization (DAA). It also describes handling unlimited and limited/restricted STI. Section 4 provides recommended standards for document format, composition, and organization and element of a typical report. Section 5 presents miscellaneous preparation recommendations. Section 6 discusses two required forms, Standard Form 298 and NF-1676. The guide cites additional sources of information of standards, guidelines, and review and approval requirements.
Developing Technical Skill Assessments
ERIC Educational Resources Information Center
Hyslop, Alisha
2009-01-01
One of the biggest challenges facing the career and technical education (CTE) community as it works to implement the 2006 Perkins Act is responding to more rigorous requirements for reporting on CTE students' technical skill attainment. The U.S. Department of Education suggested in non-regulatory guidance that states and locals use the number of…
Report: Procedural Review of EPA’s Greenhouse Gases Endangerment Finding Data Quality Processes
Report #11-P-0702, September 26, 2011. EPA met statutory requirements for rulemaking and generally followed requirements and guidance related to ensuring the quality of the supporting technical information.
14 CFR 171.11 - Maintenance and operations requirements.
Code of Federal Regulations, 2011 CFR
2011-01-01
...) Keeping of station logs and other technical reports, and the submission of reports required by § 171.13... with procedures approved by the FAA at the time of commissioning, and shall report the results of the...) The owner shall close the facility upon receiving two successive pilot reports of its malfunctioning...
14 CFR 171.11 - Maintenance and operations requirements.
Code of Federal Regulations, 2013 CFR
2013-01-01
...) Keeping of station logs and other technical reports, and the submission of reports required by § 171.13... with procedures approved by the FAA at the time of commissioning, and shall report the results of the...) The owner shall close the facility upon receiving two successive pilot reports of its malfunctioning...
NASA Technical Reports Server (NTRS)
Taylor, N. L.
1983-01-01
To response to a need for improved computer-generated plots that are acceptable to the Langley publication process, the LaRC Graphics Output System has been modified to encompass the publication requirements, and a guideline has been established. This guideline deals only with the publication requirements of computer-generated plots. This report explains the capability that authors of NASA technical reports can use to obtain publication--quality computer-generated plots or the Langley publication process. The rules applied in developing this guideline and examples illustrating the rules are included.
ERIC Educational Resources Information Center
Gragson, Derek E.; Hagen, John P.
2010-01-01
Writing formal "journal-style" lab reports is often one of the requirements chemistry and biochemistry students encounter in the physical chemistry laboratory. Helping students improve their technical writing skills is the primary reason this type of writing is a requirement in the physical chemistry laboratory. Developing these skills is an…
Overview of Energy Systems' safety analysis report programs
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-03-01
The primary purpose of an Safety Analysis Report (SAR) is to provide a basis for judging the adequacy of a facility's safety. The SAR documents the safety analyses that systematically identify the hazards posed by the facility, analyze the consequences and risk of potential accidents, and describe hazard control measures that protect the health and safety of the public and employees. In addition, some SARs document, as Technical Safety Requirements (TSRs, which include Technical Specifications and Operational Safety Requirements), technical and administrative requirements that ensure the facility is operated within prescribed safety limits. SARs also provide conveniently summarized information thatmore » may be used to support procedure development, training, inspections, and other activities necessary to facility operation. This Overview of Energy Systems Safety Analysis Report Programs'' Provides an introduction to the programs and processes used in the development and maintenance of the SARs. It also summarizes some of the uses of the SARs within Energy Systems and DOE.« less
2013-05-20
The Assistant Secretary for Special Education and Rehabilitative Services announces a priority under the Technical Assistance to Improve State Data Capacity program. The Assistant Secretary may use this priority for competitions in fiscal year (FY) 2013 and later years. We take this action to focus attention on an identified national need to provide technical assistance (TA) to States to improve their capacity to meet the data collection and reporting requirements of the Individuals with Disabilities Education Act (IDEA). We intend this priority to establish a TA center to improve State capacity to accurately collect and report IDEA data (Data Center).
ERIC Educational Resources Information Center
MILLER, AARON J.
A SELECT GROUP OF PARTICIPANTS REPRESENTING NATIONAL LEADERSHIP IN BUSINESS, INDUSTRY, RESEARCH, GOVERNMENT, AND EDUCATION MET TO IDENTIFY SOME OF THE MOST OBVIOUS NEW EMERGING TECHNICAL OCCUPATIONS WHICH MIGHT REQUIRE RESEARCH AND DEVELOPMENT EFFORTS AND SOME OF THE MOST PRESSING RESEARCHABLE PROBLEM AREAS IN TECHNICAL EDUCATION. THE NEW OR…
ERIC Educational Resources Information Center
Hartt, Richard W.
This report discusses the characteristics, operations, and automation requirements of technical libraries providing services to organizations involved in aerospace and defense scientific and technical work, and describes the Local Automation Model project. This on-going project is designed to demonstrate the concept of a fully integrated library…
14 CFR 171.161 - Maintenance and operations requirements.
Code of Federal Regulations, 2013 CFR
2013-01-01
... station logs and other technical reports, and the submission of reports required by § 171.163. (10... in accordance with procedures approved by the FAA at the time of commissioning, and shall report the... and issue a NOTAM that the facility is out-of-service) upon receiving two successive pilot reports of...
14 CFR 171.51 - Maintenance and operations requirements.
Code of Federal Regulations, 2011 CFR
2011-01-01
... sections of FAA manuals by reference. (9) Keeping of station logs and other technical reports, and the submission of reports required by § 171.53. (10) Monitoring of the facility. (11) Inspections by United... in accordance with procedures approved by the FAA at the time of commissioning, and shall report the...
14 CFR 171.51 - Maintenance and operations requirements.
Code of Federal Regulations, 2012 CFR
2012-01-01
... sections of FAA manuals by reference. (9) Keeping of station logs and other technical reports, and the submission of reports required by § 171.53. (10) Monitoring of the facility. (11) Inspections by United... in accordance with procedures approved by the FAA at the time of commissioning, and shall report the...
14 CFR 171.51 - Maintenance and operations requirements.
Code of Federal Regulations, 2013 CFR
2013-01-01
... sections of FAA manuals by reference. (9) Keeping of station logs and other technical reports, and the submission of reports required by § 171.53. (10) Monitoring of the facility. (11) Inspections by United... in accordance with procedures approved by the FAA at the time of commissioning, and shall report the...
32 CFR 34.41 - Monitoring and reporting program and financial performance.
Code of Federal Regulations, 2014 CFR
2014-07-01
... organizations, or may include equivalent technical and financial reporting requirements that ensure reasonable oversight of the expenditure of appropriated funds. As a minimum, equivalent requirements must include: (a... portions of the reports shall provide summarized details on the status of resources (federal funds and non...
ERIC Educational Resources Information Center
McManamon, P. M.; Utlaut, W. F.
The results of a survey of cable television (CATV) and related technological industries are summarized. In this, the first of a series of seven reports, attention is focused upon some major technical factors which need to be considered in order that a transition from the technical state of today's cable television and services to new teleservices…
76 FR 5494 - Pipeline Safety: Mechanical Fitting Failure Reporting Requirements
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-01
... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Part... Safety: Mechanical Fitting Failure Reporting Requirements AGENCY: Pipeline and Hazardous Materials Safety... tightening. A widely accepted industry guidance document, Gas Pipeline Technical Committee (GPTC) Guide, does...
A strategy for electronic dissemination of NASA Langley technical publications
NASA Technical Reports Server (NTRS)
Roper, Donna G.; Mccaskill, Mary K.; Holland, Scott D.; Walsh, Joanne L.; Nelson, Michael L.; Adkins, Susan L.; Ambur, Manjula Y.; Campbell, Bryan A.
1994-01-01
To demonstrate NASA Langley Research Center's relevance and to transfer technology to external customers in a timely and efficient manner, Langley has formed a working group to study and recommend a course of action for the electronic dissemination of technical reports (EDTR). The working group identified electronic report requirements (e.g., accessibility, file format, search requirements) of customers in U.S. industry through numerous site visits and personal contacts. Internal surveys were also used to determine commonalities in document preparation methods. From these surveys, a set of requirements for an electronic dissemination system was developed. Two candidate systems were identified and evaluated against the set of requirements: the Full-Text Electronic Documents System (FEDS), which is a full-text retrieval system based on the commercial document management package Interleaf, and the Langley Technical Report Server (LTRS), which is a Langley-developed system based on the publicly available World Wide Web (WWW) software system. Factors that led to the selection of LTRS as the vehicle for electronic dissemination included searching and viewing capability, current system operability, and client software availability for multiple platforms at no cost to industry. This report includes the survey results, evaluations, a description of the LTRS architecture, recommended policy statement, and suggestions for future implementations.
Spectrum orbit utilization program technical manual SOUP5 Version 3.8
NASA Technical Reports Server (NTRS)
Davidson, J.; Ottey, H. R.; Sawitz, P.; Zusman, F. S.
1984-01-01
The underlying engineering and mathematical models as well as the computational methods used by the SOUP5 analysis programs, which are part of the R2BCSAT-83 Broadcast Satellite Computational System, are described. Included are the algorithms used to calculate the technical parameters and references to the relevant technical literature. The system provides the following capabilities: requirements file maintenance, data base maintenance, elliptical satellite beam fitting to service areas, plan synthesis from specified requirements, plan analysis, and report generation/query. Each of these functions are briefly described.
ERIC Educational Resources Information Center
Office of Vocational and Adult Education, US Department of Education, 2008
2008-01-01
The "Carl D. Perkins Vocational and Technical Education Act of 1998" (commonly referred to as "Perkins," "Perkins III," or "the Act" and referred to hereafter as Perkins III) requires, in Sec. 113(c)(3)(C), that the secretary provide the appropriate committees of Congress copies of annual reports received by…
ERIC Educational Resources Information Center
Lopata, Helena Z.; And Others
This Technical Committee Report presents research on demographic trends, labor force participation, and public service programs which suggests a need to alter traditional assumptions about aging, family, and social supports required for an equitably integrated society. Demographic data on populations, families, and aging are provided, and…
ERIC Educational Resources Information Center
US Department of Education, 2007
2007-01-01
The "Carl D. Perkins Vocational and Technical Education Act of 1998" requires that the Secretary provide the appropriate committees of Congress copies of annual reports received by the department from each eligible agency that receives funds under the Act. Congress has made "accountability for results" a central focus of the…
ERIC Educational Resources Information Center
Norwich Regional Vocational Technical School, CT.
Responding to a Small Business Administration statement that technical school graduates lack knowledge of business principles, the Norwich (Connecticut) Regional Vocational Technical School conducted a course in small business ownership/management for all of its seniors. The required course, a fifty-four-hour module, replaced one English,…
7 CFR 1944.422 - Audit and other report requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... AGRICULTURE (CONTINUED) PROGRAM REGULATIONS (CONTINUED) HOUSING Self-Help Technical Assistance Grants § 1944... 7 Agriculture 13 2010-01-01 2009-01-01 true Audit and other report requirements. 1944.422 Section 1944.422 Agriculture Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nigro, D.N.
1979-11-01
The report summarizes the DDA activities for the effort performed on the procurement and delivery of eleven Allison GT 404-4 gas turbine engines and five HT740CT and six V730CT Allison automatic transmissions and the required associated software. The contract requires the delivery of the engines and transmissions for the Greyhound and Transit Coaches, respectively. In addition, software items such as cost reports, technical reports, installation drawings, acceptance test data and parts lists are required. A recent decision by the DOE will modify the build configuration for the last four (4) Transit Coach engines. It was decided by the DOE atmore » a meeting in Washington, DC on March 28, 1979 with representatives from DDA, NASA/LeRC, JPL and Booz-Allen and Hamilton that these engines are to be built with ceramic regenerators. (TFD)« less
ERIC Educational Resources Information Center
Groff, Warren H.
This report examines two models used by North Central Technical College (NCTC) in Ohio to respond to technological and social changes affecting the training requirements of its service area. As a means of illustrating a post-factum, rehabilitative response to such change, Part I of the report describes the development and outcomes of NCTC's…
ERIC Educational Resources Information Center
Seastrom, Marilyn M.; Chapman, Chris; Stillwell, Robert; McGrath, Daniel; Peltola, Pia; Dinkes, Rachel; Xu, Zeyu
2006-01-01
This report consists of two volumes, the first takes an in-depth look at the various graduation indicators, with a description of the computational formulas, the data required for each indicator, the assumptions underlying each formula, the strengths and weaknesses of each indicator, and a consideration of the conditions under which each indicator…
Funding Transparency under ESSA. Special Report
ERIC Educational Resources Information Center
Woods, Julie Rowland
2018-01-01
This special report explains the new requirements states have in reporting per-pupil expenditures under the Every Student Succeeds Act. It also provides key considerations for states and information about technical assistance and support.
Educational Furniture for the 16-19 Age Group: Specification and Design. Design Note 30.
ERIC Educational Resources Information Center
Furniture Industry Research Association, Stevenage (England).
A 1982 British study examined the furniture needs of 16-19 year-old students. This report presented the findings on the technical and performance requirements in terms of durability and ergonomics. This report examines the furniture requirements in teaching spaces, social, refreshment and private study areas, storage requirements for pupils'…
Producibility and Production Aspects of the Market Analysis Process
1989-06-01
for most TROSCOM general purpose systems and equipment are the U.S. Army Quartermaster Center and School, Fort Lee, VA ( fuels handling and storage...established a Mission Area Proponency Branch staffed with military R&D Coordinator Officers (formerly TRISOs - Technical Requirements Integration Staff...time is spent reacting, rather than acting, i.e., the amount of work required to supply numerous reports on delinquent contractors and on Technical
DOE Office of Scientific and Technical Information (OSTI.GOV)
Libman, George H.; Doerry, Armin Walter
Brief disclosures may often be sufficient for the filing of a Technical Advance with Sandia's Intellectual Property Center, but still be inadequate to facilitate an optimum patent application where more detail and explanation are required. Consequently, the crafting of a patent application may require considerably more additional interaction between the application preparer and the inventors. This inefficiency can be considerably mitigated if the inventors address some critical aspects of a patent application when they write a technical report.
Air Force Research Laboratory Wright Site Guide to Technical Publishing
2005-04-01
Scientific and Technical Reports—Elements, Organization, and Design manual (and a version modified for documents generated for AFRL) • Merriam-Webster’s...notice page --SF 298 --original graphics /halftones Indicate the following on the letter of transmittal sheet: --quantity of copies required for...Elements, Organization and Design ? The WRS CDRL for a final report requires that the standard be followed. The only exception is SBIR Phase 1
Water Processor and Oxygen Generation Assembly
NASA Technical Reports Server (NTRS)
Bedard, John
1997-01-01
This report documents the results of the tasks which initiated efforts on design issues relating to the Water Processor (WP) and the Oxygen Generation Assembly (OGA) Flight Hardware for the International Space Station. This report fulfills the Statement of Work deliverables requirement for contract H-29387D. The following lists the tasks required by contract H-29387D: (1) HSSSI shall coordinate a detailed review of WP/OGA Flight Hardware program requirements with personnel from MSFC to identify requirements that can be eliminated without affecting the technical integrity of the WP/OGA Hardware; (2) HSSSI shall conduct the technical interchanges with personnel from MSFC to resolve design issues related to WP/OGA Flight Hardware; (3) HSSSI will initiate discussions with Zellwegger Analytics, Inc. to address design issues related to WP and PCWQM interfaces.
29 CFR 2520.103-1 - Contents of the annual report.
Code of Federal Regulations, 2010 CFR
2010-07-01
... prepared in order for the independent qualified public accountant to form the opinion required by section... upon termination of the plan; information concerning whether or not a tax ruling or determination...) A report of an independent qualified public accountant. (i) Technical requirements. The accountant's...
14 CFR 1260.55 - Reports substitution.
Code of Federal Regulations, 2013 CFR
2013-01-01
... AGREEMENTS General Special Conditions § 1260.55 Reports substitution. Reports Substitution October 2000 Technical Reports may be substituted for the required Performance Reports. The title page of such reports... 14 Aeronautics and Space 5 2013-01-01 2013-01-01 false Reports substitution. 1260.55 Section 1260...
14 CFR 1260.55 - Reports substitution.
Code of Federal Regulations, 2010 CFR
2010-01-01
... AGREEMENTS General Special Conditions § 1260.55 Reports substitution. Reports Substitution October 2000 Technical Reports may be substituted for the required Performance Reports. The title page of such reports... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Reports substitution. 1260.55 Section 1260...
14 CFR 1260.55 - Reports substitution.
Code of Federal Regulations, 2011 CFR
2011-01-01
... AGREEMENTS General Special Conditions § 1260.55 Reports substitution. Reports Substitution October 2000 Technical Reports may be substituted for the required Performance Reports. The title page of such reports... 14 Aeronautics and Space 5 2011-01-01 2010-01-01 true Reports substitution. 1260.55 Section 1260...
14 CFR 1260.55 - Reports substitution.
Code of Federal Regulations, 2012 CFR
2012-01-01
... AGREEMENTS General Special Conditions § 1260.55 Reports substitution. Reports Substitution October 2000 Technical Reports may be substituted for the required Performance Reports. The title page of such reports... 14 Aeronautics and Space 5 2012-01-01 2012-01-01 false Reports substitution. 1260.55 Section 1260...
17 CFR 210.2-02 - Accountants' reports and attestation reports.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 17 Commodity and Securities Exchanges 3 2014-04-01 2014-04-01 false Accountants' reports and... AND CONSERVATION ACT OF 1975 Qualifications and Reports of Accountants § 210.2-02 Accountants' reports and attestation reports. (a) Technical requirements for accountants' reports. The accountant's report...
17 CFR 210.2-02 - Accountants' reports and attestation reports.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 17 Commodity and Securities Exchanges 2 2013-04-01 2013-04-01 false Accountants' reports and... AND CONSERVATION ACT OF 1975 Qualifications and Reports of Accountants § 210.2-02 Accountants' reports and attestation reports. (a) Technical requirements for accountants' reports. The accountant's report...
17 CFR 210.2-02 - Accountants' reports and attestation reports.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 17 Commodity and Securities Exchanges 2 2012-04-01 2012-04-01 false Accountants' reports and... AND CONSERVATION ACT OF 1975 Qualifications and Reports of Accountants § 210.2-02 Accountants' reports and attestation reports. (a) Technical requirements for accountants' reports. The accountant's report...
Navajo Electrification Demonstraiton Project
DOE Office of Scientific and Technical Information (OSTI.GOV)
Larry Ahasteen, Project Manager
2006-07-17
This is a final technical report required by DOE for the Navajo Electrification Demonstration Program, This report covers the electric line extension project for Navajo families that currently without electric power.
Discovering system requirements
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bahill, A.T.; Bentz, B.; Dean, F.F.
1996-07-01
Cost and schedule overruns are often caused by poor requirements that are produced by people who do not understand the requirements process. This report provides a high-level overview of the system requirements process, explaining types, sources, and characteristics of good requirements. System requirements, however, are seldom stated by the customer. Therefore, this report shows ways to help you work with your customer to discover the system requirements. It also explains terminology commonly used in the requirements development field, such as verification, validation, technical performance measures, and the various design reviews.
Inertial Fusion Energy reactor design studies: Prometheus-L, Prometheus-H. Volume 2, Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Waganer, L.M.; Driemeyer, D.E.; Lee, V.D.
1992-03-01
This report contains a review of design studies for Inertial Confinement reactor. This second of three volumes discussions is some detail the following: Objectives, requirements, and assumptions; rationale for design option selection; key technical issues and R&D requirements; and conceptual design selection and description.
Electronic Reporting of Air Emissions
EPA regulations require affected sources to perform emissions source tests, conduct continuous emissions monitoring, and submit compliance and emissions reports. This site provides technical resources and access for providing such submissions.
Final Report - LAW Envelope C Glass Formulation Testing to Increase Waste Loading, VSL-05R5900-1
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kruger, Albert A.; Pegg, I. L.; Matlack, K. S.
2013-12-03
This report describes the results of testing specified by Test Plan VSL-05R5900-1 Rev.0. The work was performed in compliance with the quality assurance requirements specified in the Test Plan. Results required by the Test Plan are reported. The test results and this report have been reviewed for correctness, technical adequacy, completeness, and accuracy.
The 1990 Johnson Space Center bibliography of scientific and technical papers
NASA Technical Reports Server (NTRS)
1991-01-01
Abstracts are presented of scientific and technical papers written and/or presented by L. B. Johnson Space Center (JSC) authors, including civil servants, contractors, and grantees, during the calendar year of 1990. Citations include conference and symposium presentations, papers published in proceedings or other collective works, seminars, and workshop results, NASA formal report series (including contractually required final reports), and articles published in professional journals.
Minimally Invasive Implantable Fetal Micropacemaker: Mechanical Testing and Technical Refinements
Zhou, Li; Vest, Adriana N.; Peck, Raymond A.; Sredl, Jonathan P.; Huang, Xuechen; Bar-Cohen, Yaniv; Silka, Michael J.; Pruetz, Jay D.; Chmait, Ramen H.; Loeb, Gerald E.
2016-01-01
This paper discusses the technical and safety requirements for cardiac pacing of a human fetus with heart failure and hydrops fetalis secondary to complete heart block. Engineering strategies to meet specific technical requirements were integrated into a systematic design and implementation consisting of a novel fetal micropacemaker, a percutaneous implantation system, and a sterile package that enables device storage and recharging maintenance in a clinical setting. We further analyzed observed problems on myocardial fixation and pacing lead fatigue previously reported in earlier preclinical trials. This paper describes the technical refinements of the implantable fetal micropacemaker to overcome these challenges. The mechanical performance has been extensively tested to verify the improvement of reliability and safety margins of the implantation system. PMID:27021067
Prefocal station mechanical design concept study for the E-ELT
NASA Astrophysics Data System (ADS)
Jolley, Paul; Brunetto, Enzo; Frank, Christoph; Lewis, Steffan; Marchetti, Enrico
2016-07-01
The Nasmyth platforms of the E-ELT will contain one Prefocal Station (PFS) each. The main PFS functional requirements are to provide a focal plane to the three Nasmyth focal stations and the Coudé focus, optical sensing supporting telescope low order optimisation and seeing limited image quality, and optical sensing supporting characterising and phasing of M1 and other telescope subsystems. The PFS user requirements are used to derive the PFS technical requirements specification that will form the basis for design, development and production of the system. This specification process includes high-level architectural decisions and technical performance budget allocations. The mechanical design concepts reported here have been developed in order to validate key system specifications and associated technical budgets.
TRAC-Monterey FY16 Work Program Development and Report of Research Elicitation
2016-01-01
any changes to priorities or additional projects that require immediate research. Work Program; Research Elicitation Unclassified UU UU UU UU 35 MAJ...conduct analysis for the Army. 1 Marks, Chris, Nesbitt, Peter. TRAC FY14 Research Requirements Elicitation . Technical Report TRAC-M-TM-13-059. 700 Dyer... Requirements Elicitation Interviews Interview Guide: 1. Describe a research requirement in the areas of topics, techniques, and methodologies. 2
14 CFR § 1260.55 - Reports substitution.
Code of Federal Regulations, 2014 CFR
2014-01-01
... AGREEMENTS General Special Conditions § 1260.55 Reports substitution. Reports Substitution October 2000 Technical Reports may be substituted for the required Performance Reports. The title page of such reports... 14 Aeronautics and Space 5 2014-01-01 2014-01-01 false Reports substitution. § 1260.55 Section Â...
17 CFR 210.2-02 - Accountants' reports and attestation reports.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 17 Commodity and Securities Exchanges 2 2011-04-01 2011-04-01 false Accountants' reports and... Accountants § 210.2-02 Accountants' reports and attestation reports. (a) Technical requirements for accountants' reports. The accountant's report: (1) Shall be dated; (2) Shall be signed manually; (3) Shall...
Author index to published ERTS-1 reports
Bidwell, Timothy C.; Mitchell, Cheryl A.
1975-01-01
This index has been compiled to assist the reader in locating and obtaining reports on the 334 scientific experiments conducted under the National Aeronautics and Space Administration (NASA) Earth Resources Technology Satellite-1 (ERTS-1) (renamed Landsat) program. Each NASA-designated experimenter was required to submit written reports on his investigation: these were designated type 1, type 2, and type 3 reports. Type 1 reports were periodic (monthly or bimonthly) progress summaries; type 2 were comprehensive scientific and technical reports; and type 3 were final report. Investigators were also encourage to present their more significant findings in professional or technical journals and proceedings of symposia.
14 CFR 21.253 - Type certificates: application.
Code of Federal Regulations, 2010 CFR
2010-01-01
... made; (4) After placing the required technical data and type inspection report in the technical data... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Type certificates: application. 21.253....253 Type certificates: application. Link to an amendment published at 74 FR 53390, October 16, 2009...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-02
... Acquisition Regulation Supplement; Independent Research and Development Technical Descriptions (DFARS Case... (DFARS) to require contractors to report independent research and development (IR&D) projects generating... the address shown below on or before May 2, 2011, to be considered in the formation of the final rule...
A Portable Presentation Package for Audio-Visual Instruction. Technical Documentary Report.
ERIC Educational Resources Information Center
Smith, Edgar A.; And Others
The Portable Presentation Package is a prototype of an audiovisual equipment package designed to facilitate technical training in remote areas, situations in which written communications are difficult, or in situations requiring rapid presentation of instructional material. The major criteria employed in developing the package were (1) that the…
Technical information report: Plasma melter operation, reliability, and maintenance analysis
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hendrickson, D.W.
1995-03-14
This document provides a technical report of operability, reliability, and maintenance of a plasma melter for low-level waste vitrification, in support of the Hanford Tank Waste Remediation System (TWRS) Low-Level Waste (LLW) Vitrification Program. A process description is provided that minimizes maintenance and downtime and includes material and energy balances, equipment sizes and arrangement, startup/operation/maintence/shutdown cycle descriptions, and basis for scale-up to a 200 metric ton/day production facility. Operational requirements are provided including utilities, feeds, labor, and maintenance. Equipment reliability estimates and maintenance requirements are provided which includes a list of failure modes, responses, and consequences.
NASA Technical Reports Server (NTRS)
Cable, D. A.; Diewald, C. A.; Hills, T. C.; Parmentier, T. J.; Spencer, R. A.; Stone, G. E.
1984-01-01
Volume 2 contains the Technical Report of the approach and results of the Phase 2 study. The phase 2 servicing study was initiated in June 1983, and is being reported in this document. The scope of the contract was to: (1) define in detail five selected technology development missions (TDM); (2) conduct a design requirement analysis to refine definitions of satellite servicing requirements at the space station; and (3) develop a technology plan that would identify and schedule prerequisite precursor technology development, associated. STS flight experiments and space station experiments needed to provide onorbit validation of the evolving technology.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kruger, Albert A.; Joseph, I.; Muller, I. S.
This report describes the results of testing specified by the Test Plan VSL-06R6900-1 Rev 0. The work was performed in compliance with quality assurance requirements specified in the Test Plan. Results required by the Test Plan are reported. The test results and this report have been reviewed for correctness, technical adequacy, completeness, and accuracy.
Murphy, Thomas; Schwedock, Julie; Nguyen, Kham; Mills, Anna; Jones, David
2015-01-01
New recommendations for the validation of rapid microbiological methods have been included in the revised Technical Report 33 release from the PDA. The changes include a more comprehensive review of the statistical methods to be used to analyze data obtained during validation. This case study applies those statistical methods to accuracy, precision, ruggedness, and equivalence data obtained using a rapid microbiological methods system being evaluated for water bioburden testing. Results presented demonstrate that the statistical methods described in the PDA Technical Report 33 chapter can all be successfully applied to the rapid microbiological method data sets and gave the same interpretation for equivalence to the standard method. The rapid microbiological method was in general able to pass the requirements of PDA Technical Report 33, though the study shows that there can be occasional outlying results and that caution should be used when applying statistical methods to low average colony-forming unit values. Prior to use in a quality-controlled environment, any new method or technology has to be shown to work as designed by the manufacturer for the purpose required. For new rapid microbiological methods that detect and enumerate contaminating microorganisms, additional recommendations have been provided in the revised PDA Technical Report No. 33. The changes include a more comprehensive review of the statistical methods to be used to analyze data obtained during validation. This paper applies those statistical methods to analyze accuracy, precision, ruggedness, and equivalence data obtained using a rapid microbiological method system being validated for water bioburden testing. The case study demonstrates that the statistical methods described in the PDA Technical Report No. 33 chapter can be successfully applied to rapid microbiological method data sets and give the same comparability results for similarity or difference as the standard method. © PDA, Inc. 2015.
ERIC Educational Resources Information Center
Gilbert, Lynn E.; Shipman, Virginia C.
The Johns Hopkins Perceptual Test, a brief measure of intelligence in children, requires the child to choose a form identical to a standard. It consists of 3 practice and 30 test items, all involving black geometric figures printed on white cards. There is one booklet for stimulus cards and one for response cards. The child is presented with a…
Report #2004-P-00010, March 25, 2004. The Coalition was not a qualified TAG recipient because of the potential conflicts of interest as defined in 40 CFR 30.42, and did not meet the minimum capability requirements required by the CFR.
NASA Technical Reports Server (NTRS)
Hatterick, G. R.
1972-01-01
Activities are documented of the study to determine skills required of on-orbit crew personnel of the space shuttle. The material is presented in four sections that include: (1) methodology for identifying flight experiment task-skill requirements, (2) task-skill analysis of selected flight experiments, (3) study results and conclusions, and (4) new technology.
48 CFR 246.370 - Material inspection and receiving report.
Code of Federal Regulations, 2012 CFR
2012-10-01
... deliverable is a scientific or technical report; (5) Research and development contracts not requiring the... receiving report. 246.370 Section 246.370 Federal Acquisition Regulations System DEFENSE ACQUISITION... Material inspection and receiving report. (a) Use the clause at 252.246-7000, Material Inspection and...
14 CFR § 1260.28 - Patent rights.
Code of Federal Regulations, 2014 CFR
2014-01-01
... disclosed during the preceding year in the performance report, technical report, or renewal proposal. A... of any reports, manuscripts, publications or similar material bearing on patent matters, shall be... requirements in the grant provisions. If any reports contain information describing a “subject invention” for...
48 CFR 246.370 - Material inspection and receiving report.
Code of Federal Regulations, 2014 CFR
2014-10-01
... deliverable is a scientific or technical report; (5) Research and development contracts not requiring the... receiving report. 246.370 Section 246.370 Federal Acquisition Regulations System DEFENSE ACQUISITION... Material inspection and receiving report. (a) Use the clause at 252.246-7000, Material Inspection and...
Software Engineering Improvement Plan
NASA Technical Reports Server (NTRS)
2006-01-01
In performance of this task order, bd Systems personnel provided support to the Flight Software Branch and the Software Working Group through multiple tasks related to software engineering improvement and to activities of the independent Technical Authority (iTA) Discipline Technical Warrant Holder (DTWH) for software engineering. To ensure that the products, comments, and recommendations complied with customer requirements and the statement of work, bd Systems personnel maintained close coordination with the customer. These personnel performed work in areas such as update of agency requirements and directives database, software effort estimation, software problem reports, a web-based process asset library, miscellaneous documentation review, software system requirements, issue tracking software survey, systems engineering NPR, and project-related reviews. This report contains a summary of the work performed and the accomplishments in each of these areas.
7 CFR 1944.541 - Reporting requirements.
Code of Federal Regulations, 2011 CFR
2011-01-01
...) PROGRAM REGULATIONS (CONTINUED) HOUSING Technical and Supervisory Assistance Grants § 1944.541 Reporting... District Director to determine satisfactory progress. The District Director will work with the grantee to... five working days of receipt. (1) If the reports indicate satisfactory progress, the State Director...
10 CFR 600.341 - Monitoring and reporting program and financial performance.
Code of Federal Regulations, 2012 CFR
2012-01-01
... will be taken to address the deviations. (2) A final technical report if the award is for research and... dates for reports. At a minimum, requirements must include: (1) Periodic progress reports (at least... follows: (i) The program portions of the reports must address progress toward achieving program...
10 CFR 600.341 - Monitoring and reporting program and financial performance.
Code of Federal Regulations, 2014 CFR
2014-01-01
... will be taken to address the deviations. (2) A final technical report if the award is for research and... dates for reports. At a minimum, requirements must include: (1) Periodic progress reports (at least... follows: (i) The program portions of the reports must address progress toward achieving program...
10 CFR 600.341 - Monitoring and reporting program and financial performance.
Code of Federal Regulations, 2013 CFR
2013-01-01
... will be taken to address the deviations. (2) A final technical report if the award is for research and... dates for reports. At a minimum, requirements must include: (1) Periodic progress reports (at least... follows: (i) The program portions of the reports must address progress toward achieving program...
10 CFR 600.341 - Monitoring and reporting program and financial performance.
Code of Federal Regulations, 2011 CFR
2011-01-01
... will be taken to address the deviations. (2) A final technical report if the award is for research and... dates for reports. At a minimum, requirements must include: (1) Periodic progress reports (at least... follows: (i) The program portions of the reports must address progress toward achieving program...
Savel, Craig; Mierzwa, Stan; Gorbach, Pamina M; Souidi, Samir; Lally, Michelle; Zimet, Gregory; Interventions, Aids
2016-01-01
This paper reports on a specific Web-based self-report data collection system that was developed for a public health research study in the United States. Our focus is on technical outcome results and lessons learned that may be useful to other projects requiring such a solution. The system was accessible from any device that had a browser that supported HTML5. Report findings include: which hardware devices, Web browsers, and operating systems were used; the rate of survey completion; and key considerations for employing Web-based surveys in a clinical trial setting.
2004-09-21
The rule finalizes technical changes to the Healthcare Integrity and Protection Data Bank (HIPDB) data collection reporting requirements by clarifying the types of personal numeric identifiers that may be reported to the data bank in connection with adverse actions. The rule clarifies that in lieu of a Social Security Number (SSN), an individual taxpayer identification number (ITIN) may be reported to the data bank when, in those limited situations, an individual does not have an SSN.
Mature Programs of Study: Examining Policy Implementation at the Local Level. Final Report
ERIC Educational Resources Information Center
Alfeld, Corinne; Bhattacharya, Sharika
2013-01-01
The 2006 Carl D. Perkins Career and Technical Education Act required that all career technical education (CTE) programs offer secondary to postsecondary programs of study (POS), which integrate rigorous academics, offer dual enrollment options, and lead to an industry-recognized degree or credential. Focused on improving students' transition to…
14 CFR 21.253 - Type certificates: application.
Code of Federal Regulations, 2011 CFR
2011-01-01
... technical data and type inspection report in the technical data file required by § 21.293(a)(1)(i), a statement certifying that this has been done; (5) A proposed type certificate data sheet; and (6) An... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Type certificates: application. 21.253...
48 CFR 915.404-2 - Information to support proposal analysis.
Code of Federal Regulations, 2010 CFR
2010-10-01
... for the auditor's review. (ii) Copies of technical analysis reports prepared by DOE technical or other... proposal analysis. 915.404-2 Section 915.404-2 Federal Acquisition Regulations System DEPARTMENT OF ENERGY... support proposal analysis. (a)(1) Field pricing assistance as discussed in FAR 15.404-2(a) is not required...
Report of the Education Technical Subcommittee on Food/Beverage Occupations.
ERIC Educational Resources Information Center
Oregon State Dept. of Education, Salem. Div. of Vocational Education.
Written by a technical committee of persons from industry, professional associations, and labor, as well as persons with special expertise, state officials, and educators in Oregon, this document lists the skills and knowledge required of employees in food and beverage occupations. It also identifies the industry standards (performance objectives)…
ERIC Educational Resources Information Center
Oregon State Dept. of Education, Salem. Div. of Vocational Education.
Written by a technical committee's industry representatives, state officials, and educators in Oregon, this document lists the skills and knowledge required by employees in travel and tourism occupations. The following occupations are considered: rental representative; service agent; travel agent; bus/tour/driver/guide/sightseeing leader; manager…
Wege zur Festigung der Fachlexik (Ways of Building a Technical Vocabulary)
ERIC Educational Resources Information Center
Kalmykowa, Elena
1974-01-01
Learning to read foreign technical texts requires (a) a minimum vocabulary and (b) effective drill. The following are suggested: translation, question-answer method, definition exercises, exercises to develop skill in the use of reference works, schematic presentations and tables, annotating and making reports and summaries. (Text is in German.)…
77 FR 39899 - Technical Corrections
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-06
..., Nuclear material, Oil and gas exploration--well logging, Reporting and recordkeeping requirements... recordkeeping requirements, Source material, Uranium. 10 CFR Part 50 Antitrust, Classified information, Criminal... measures, Special nuclear material, Uranium enrichment by gaseous diffusion. 10 CFR Part 81 Administrative...
Building Stronger State Energy Partnerships with the U.S. Department of Energy
DOE Office of Scientific and Technical Information (OSTI.GOV)
Marks, Kate
2011-09-30
This final technical report details the results of total work efforts and progress made from October 2007 – September 2011 under the National Association of State Energy Officials (NASEO) cooperative agreement DE-FC26-07NT43264, Building Stronger State Energy Partnerships with the U.S. Department of Energy. Major topical project areas in this final report include work efforts in the following areas: Energy Assurance and Critical Infrastructure, State and Regional Technical Assistance, Regional Initiative, Regional Coordination and Technical Assistance, and International Activities in China. All required deliverables have been provided to the National Energy Technology Laboratory and DOE program officials.
ERIC Educational Resources Information Center
Ward, William C.
The Motor Inhibition Test, which measures "impulse control," requires the child to perform three motor acts. These acts are: walking a distance of six feet on a five-ince wide runway; drawing a line, using ruler and pencil, between two points 8-1/2 inches apart; and winding a toy jeep up to the rear of a toy two truck, a distance of 30…
14 CFR 1260.28 - Patent rights.
Code of Federal Regulations, 2011 CFR
2011-01-01
... preceding year in the performance report, technical report, or renewal proposal. A complete list (or a.... A copy of all submissions or requests required by this clause, plus a copy of any reports... provisions. If any reports contain information describing a “subject invention” for which the recipient has...
14 CFR 1260.28 - Patent rights.
Code of Federal Regulations, 2012 CFR
2012-01-01
... preceding year in the performance report, technical report, or renewal proposal. A complete list (or a.... A copy of all submissions or requests required by this clause, plus a copy of any reports... provisions. If any reports contain information describing a “subject invention” for which the recipient has...
14 CFR 1260.28 - Patent rights.
Code of Federal Regulations, 2013 CFR
2013-01-01
... preceding year in the performance report, technical report, or renewal proposal. A complete list (or a.... A copy of all submissions or requests required by this clause, plus a copy of any reports... provisions. If any reports contain information describing a “subject invention” for which the recipient has...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-01
... reporting system designed to help State Administrative Agencies (SAAs) meet all reporting requirements as... annual costs to respondents operations and maintenance costs for technical services. There is no annual...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-24
... Equation W-7 to allow for reporters to use alternative methods such as engineering estimates based on best... requirement in 40 CFR 98.236 for reporting of ``annual throughput as determined by engineering estimate based...
Climate Adaptation and Resiliency Planning : Agency Roles and Workforce Development Needs.
DOT National Transportation Integrated Search
2017-10-01
This report is one of two NCST Research Reports produced as part of a project to evaluate the state of practice and adequacy of technical tools for resiliency and adaptation planning. A companion report, Network Requirements for Assessing Criticality...
Climate Adaptation and Resiliency Planning : Agency Roles and Workforce Development Needs
DOT National Transportation Integrated Search
2017-10-01
This report is one of two NCST Research Reports produced as part of a project to evaluate the state of practice and adequacy of technical tools for resiliency and adaptation planning. A companion report, Network Requirements for Assessing Criticality...
Weintraub, Ari Y; Deutsch, Ellen S; Hales, Roberta L; Buchanan, Newton A; Rock, Whitney L; Rehman, Mohamed A
2017-06-01
Learning to use a new electronic anesthesia information management system can be challenging. Documenting anesthetic events, medication administration, and airway management in an unfamiliar system while simultaneously caring for a patient with the vigilance required for safe anesthesia can be distracting and risky. This technical report describes a vendor-agnostic approach to training using a high-technology manikin in a simulated clinical scenario. Training was feasible and valued by participants but required a combination of electronic and manual components. Further exploration may reveal simulated patient care training that provides the greatest benefit to participants as well as feedback to inform electronic health record improvements.
NASA Technical Reports Server (NTRS)
1977-01-01
An analysis of construction operation is presented as well as power system sizing requirements. Mission hardware requirements are reviewed in detail. Space construction base and design configurations are also examined.
Developing design elements for scenic byways in Virginia : final report.
DOT National Transportation Integrated Search
1991-01-01
Virginia has had a scenic roads program since 1966 that provides for the designation of certain roads as Virginia Byways. This program does not require the application of any special technical requirements in the selection, designation, maintenance, ...
2014 Enhanced LAW Glass Property-Composition Models, Phase 2
DOE Office of Scientific and Technical Information (OSTI.GOV)
Muller, Isabelle; Pegg, Ian L.; Joseph, Innocent
2015-10-28
This report describes the results of testing specified by the Enhanced LAW Glass Property-Composition Models, VSL-13T3050-1, Rev. 0 Test Plan. The work was performed in compliance with the quality assurance requirements specified in the Test Plan. Results required by the Test Plan are reported. The te4st results and this report have been reviewed for correctness, technical adequacy, completeness, and accuracy.
14 CFR 1274.921 - Publications and reports: non-proprietary research results.
Code of Federal Regulations, 2013 CFR
2013-01-01
... media in which the research was discussed. The Recipient shall submit the following technical reports... 14 Aeronautics and Space 5 2013-01-01 2013-01-01 false Publications and reports: non-proprietary... Publications and reports: non-proprietary research results. The requirements set forth under this provision may...
14 CFR § 1274.921 - Publications and reports: non-proprietary research results.
Code of Federal Regulations, 2014 CFR
2014-01-01
... media in which the research was discussed. The Recipient shall submit the following technical reports... 14 Aeronautics and Space 5 2014-01-01 2014-01-01 false Publications and reports: non-proprietary... Publications and reports: non-proprietary research results. The requirements set forth under this provision may...
18 CFR 401.73 - Form of request.
Code of Federal Regulations, 2010 CFR
2010-04-01
..., within such reasonable time (not less than 30 days) as he may specify, a technical report of the facts relating to the objection prior to the scheduling of the hearing. The report shall be required by notice in...
18 CFR 401.73 - Form of request.
Code of Federal Regulations, 2014 CFR
2014-04-01
..., within such reasonable time (not less than 30 days) as he may specify, a technical report of the facts relating to the objection prior to the scheduling of the hearing. The report shall be required by notice in...
18 CFR 401.73 - Form of request.
Code of Federal Regulations, 2013 CFR
2013-04-01
..., within such reasonable time (not less than 30 days) as he may specify, a technical report of the facts relating to the objection prior to the scheduling of the hearing. The report shall be required by notice in...
18 CFR 401.73 - Form of request.
Code of Federal Regulations, 2012 CFR
2012-04-01
..., within such reasonable time (not less than 30 days) as he may specify, a technical report of the facts relating to the objection prior to the scheduling of the hearing. The report shall be required by notice in...
10 CFR 300.9 - Reporting and recordkeeping requirements.
Code of Federal Regulations, 2012 CFR
2012-01-01
... these guidelines, all reports must conform to the measurement methods established by the Technical... justification. (3) If a change in calculation methods (for inventories or reductions) is made for a particular year, the reporting entity must, if feasible, revise its base value to assure methodological...
10 CFR 300.9 - Reporting and recordkeeping requirements.
Code of Federal Regulations, 2013 CFR
2013-01-01
... these guidelines, all reports must conform to the measurement methods established by the Technical... justification. (3) If a change in calculation methods (for inventories or reductions) is made for a particular year, the reporting entity must, if feasible, revise its base value to assure methodological...
10 CFR 300.9 - Reporting and recordkeeping requirements.
Code of Federal Regulations, 2014 CFR
2014-01-01
... these guidelines, all reports must conform to the measurement methods established by the Technical... justification. (3) If a change in calculation methods (for inventories or reductions) is made for a particular year, the reporting entity must, if feasible, revise its base value to assure methodological...
10 CFR 300.9 - Reporting and recordkeeping requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... these guidelines, all reports must conform to the measurement methods established by the Technical... justification. (3) If a change in calculation methods (for inventories or reductions) is made for a particular year, the reporting entity must, if feasible, revise its base value to assure methodological...
10 CFR 300.9 - Reporting and recordkeeping requirements.
Code of Federal Regulations, 2011 CFR
2011-01-01
... these guidelines, all reports must conform to the measurement methods established by the Technical... justification. (3) If a change in calculation methods (for inventories or reductions) is made for a particular year, the reporting entity must, if feasible, revise its base value to assure methodological...
Telescience Testbed Pilot Program
NASA Technical Reports Server (NTRS)
Gallagher, Maria L. (Editor); Leiner, Barry M. (Editor)
1988-01-01
The Telescience Testbed Pilot Program is developing initial recommendations for requirements and design approaches for the information systems of the Space Station era. During this quarter, drafting of the final reports of the various participants was initiated. Several drafts are included in this report as the University technical reports.
NASA Technical Reports Server (NTRS)
Gavin, Thomas R.
2006-01-01
This viewgraph presentation reviews the many parts of the JPL mission planning process that the project manager has to work with. Some of them are: NASA & JPL's institutional requirements, the mission systems design requirements, the science interactions, the technical interactions, financial requirements, verification and validation, safety and mission assurance, and independent assessment, review and reporting.
Technical Leadership Development Program
2010-12-13
the traditional tenets of leadership and management , systems thinking, understanding SOS issues, and thinking and acting holistically. Our research...international element 2.0 Enterprise Leadership and Management UNCLASSIFIED Contract Number: H98230-08-D-0171 DO 002. TO002, RT 004 Report No...mechanisms for leadership of the overall technical effort, for systems engineering, for requirements, management , and for systems integration. o Develop
Selection of air traffic controllers : complexity, requirements, and public interest.
DOT National Transportation Integrated Search
1991-05-01
The essays in this technical report represent presentations made as part of a symposium entitled "Selection of Air Traffic Controllers: Complexity, Requirements, and Public Interest." The symposium was presented at the 98th Annual Convention of the A...
Savel, Craig; Mierzwa, Stan; Gorbach, Pamina M.; Souidi, Samir; Lally, Michelle; Zimet, Gregory; Interventions, AIDS
2016-01-01
This paper reports on a specific Web-based self-report data collection system that was developed for a public health research study in the United States. Our focus is on technical outcome results and lessons learned that may be useful to other projects requiring such a solution. The system was accessible from any device that had a browser that supported HTML5. Report findings include: which hardware devices, Web browsers, and operating systems were used; the rate of survey completion; and key considerations for employing Web-based surveys in a clinical trial setting. PMID:28149445
ECLSS medical support activities
NASA Technical Reports Server (NTRS)
Crump, William J.; Kilgore, Melvin V., Jr.
1991-01-01
During the period from April 10, 1990 to April 9, 1991, the Consortium for the Space Life Sciences provided technical assistance to the NASA/MSFC water recovery efforts. This assistance was in the form of literature reviews, technical recommendations, and presentations. This final report summarizes the activities completed during this period and identifies those areas requiring additional efforts. The tasks which the University of Alabama in Huntsville (UAH) water recovery team addressed were either identified by MSFC technical representatives or chosen from those outlined in the subject statement of work.
1984-02-01
and is approved for publication. APPROVED: ’"" " Project Engineer APPROVED:k 1 4 RAYMOND P. URTZ, JR. Acting Technical Director Command and Control ...Technical Director Command and Control Division FOR THE COMMANDER: JOHN A. RITZ Acting Chief, Plans Office If your address has changed or if you wish to be...179 55812203 Denver CO 80201 55812203 I. CONTROLLING OFFICE NAME AND ADDRESS 12. REPORT DATE Rome Air Development Center (COEE) February 1984 Griffiss
14 CFR 1274.921 - Publications and reports: non-proprietary research results.
Code of Federal Regulations, 2010 CFR
2010-01-01
... media in which the research was discussed. The Recipient shall submit the following technical reports... research results. 1274.921 Section 1274.921 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE... Publications and reports: non-proprietary research results. The requirements set forth under this provision may...
75 FR 37815 - Submission for OMB review; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-30
... agencies to annually report error rate measures. Section 2 of the Improper Payments Information Act... requires preparation and submission of a report of errors occurring in the administration of Child Care... the annual Agency Financial Report (AFR) and will provide information necessary to offer technical...
2004-06-17
The rule makes technical changes to the Healthcare Integrity and Protection Data Bank (HIPDB) data collection reporting requirements set forth in 45 CFR part 61 by clarifying the types of personal numeric identifiers that may be reported to the data bank in connection with adverse actions. Specifically, the rule clarifies that in lieu of a Social Security Number (SSN), an individual taxpayer identification number (ITIN) may be reported to the data bank when, in those limited situations, an individual does not have an SSN.
Turnaround operations analysis for OTV. Volume 2: Detailed technical report
NASA Technical Reports Server (NTRS)
1988-01-01
The objectives and accomplishments were to adapt and apply the newly created database of Shuttle/Centaur ground operations. Previously defined turnaround operations analyses were to be updated for ground-based OTVs (GBOTVs) and space-based OTVs (SBOTVs), design requirements identified for both OTV and Space Station accommodations hardware, turnaround operations costs estimated, and a technology development plan generated to develop the required capabilities. Technical and programmatic data were provided for NASA pertinent to OTV round and space operations requirements, turnaround operations, task descriptions, timelines and manpower requirements, OTV modular design and booster and Space Station interface requirements. SBOTV accommodations development schedule, cost and turnaround operations requirements, and a technology development plan for ground and space operations and space-based accommodations facilities and support equipment. Significant conclusion are discussed.
Gas turbine engines and transmissions for bus demonstration program
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nigro, D.N.
1981-11-01
This final report is to fulfill the contractural requirements of Contract DE-AC02-78CS54867 which required the delivery of 11 Allison GT 404-4 Industrial Gas Turbine Engines and five HT740CT and six V730CT Allison Automatic Transmissions for the Greyhound and Transit Coaches, respectively. In addition, software items such as cost reports, technical reports, installation drawings, acceptance test data and parts lists were required. Engine and transmission deliveries were completed with shipment of the last power package on 11 April 1980. Software items were submitted when required during the performance period of this contract.
Another Look at the Draft Mil-Std-1540E Unit Random Vibration Test Requirements
NASA Astrophysics Data System (ADS)
Perl, E.; Peterson, A. J..; Davis, D.
2012-07-01
The draft Mil-Std-1540E has been updated to reflect lessons learned since its publication as an SMC Standard in 2008, [1], and an earlier Aerospace Corporation Technical Report released in 2006, [2]. This paper discusses the technical rationale supporting some of the unit random vibration test requirements to provide better insight into their derivation and application to programs. It is intended that these requirements be tailored for each program to reflect the customer risk profile. Several tailoring options are provided and a two phase test strategy is discussed to highlight its applicability to utilizing heritage hardware in new applications.
NASA Technical Reports Server (NTRS)
1976-01-01
The engineering analyses and evaluation studies conducted for the Software Requirements Analysis are discussed. Included are the development of the study data base, synthesis of implementation approaches for software required by both mandatory onboard computer services and command/control functions, and identification and implementation of software for ground processing activities.
A Preliminary Report on Teaching Academic Readiness. Technical Report #34.
ERIC Educational Resources Information Center
Au, Kathryn H.
This Kamehameha Early Education Program (KEEP) report describes the development of a systematic program for teaching academic readiness skills to kindergarten children who require special help to develop attentional behaviors. The progress of eight kindergarten children (five boys and three girls) is described to illustrate the merit of the…
Report of the Technical Committee for Hospitality, Tourism, Recreation.
ERIC Educational Resources Information Center
Oregon State Dept. of Education, Salem. Div. of Vocational Education.
This color-coded committee report identifies the skills and knowledge required by employees in the hospitality/tourism/recreation occupational area. The reports of four subcommittees focused on food/beverage, hotel/motel, recreation/leisure, and travel/tourism skills are also included. Introductory materials include a general statement of the…
ERIC Educational Resources Information Center
Smith, Ernest K.; And Others
The system control facilities in broadband communication systems are discussed in this report. These facilities consist of head-ends and central processors. The first section summarizes technical problems and needs, and the second offers a cursory overview of systems, along with an incidental mention of processors. Section 3 looks at the question…
NASA software documentation standard software engineering program
NASA Technical Reports Server (NTRS)
1991-01-01
The NASA Software Documentation Standard (hereinafter referred to as Standard) can be applied to the documentation of all NASA software. This Standard is limited to documentation format and content requirements. It does not mandate specific management, engineering, or assurance standards or techniques. This Standard defines the format and content of documentation for software acquisition, development, and sustaining engineering. Format requirements address where information shall be recorded and content requirements address what information shall be recorded. This Standard provides a framework to allow consistency of documentation across NASA and visibility into the completeness of project documentation. This basic framework consists of four major sections (or volumes). The Management Plan contains all planning and business aspects of a software project, including engineering and assurance planning. The Product Specification contains all technical engineering information, including software requirements and design. The Assurance and Test Procedures contains all technical assurance information, including Test, Quality Assurance (QA), and Verification and Validation (V&V). The Management, Engineering, and Assurance Reports is the library and/or listing of all project reports.
Oregon School and District Report Card Policy and Technical Manual
ERIC Educational Resources Information Center
Oregon Department of Education, 2012
2012-01-01
The school and district report cards were created by the 1999 Oregon Legislature. The legislation requires that the Oregon Department of Education (ODE) produce and issue a report card to all public schools and districts in the state. The report cards are designed to: (1) Communicate the many good things occurring in Oregon's public schools; (2)…
Code of Federal Regulations, 2011 CFR
2011-10-01
... 42 Public Health 1 2011-10-01 2011-10-01 false Will this voluntary uniform data set reporting... Provisions Health Status Reports § 137.205 Will this voluntary uniform data set reporting activity be... resources, hardware, software, and technical assistance to the Self-Governance Tribes to facilitate data...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 42 Public Health 1 2014-10-01 2014-10-01 false Will this voluntary uniform data set reporting... Provisions Health Status Reports § 137.205 Will this voluntary uniform data set reporting activity be... resources, hardware, software, and technical assistance to the Self-Governance Tribes to facilitate data...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 42 Public Health 1 2013-10-01 2013-10-01 false Will this voluntary uniform data set reporting... Provisions Health Status Reports § 137.205 Will this voluntary uniform data set reporting activity be... resources, hardware, software, and technical assistance to the Self-Governance Tribes to facilitate data...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 42 Public Health 1 2012-10-01 2012-10-01 false Will this voluntary uniform data set reporting... Provisions Health Status Reports § 137.205 Will this voluntary uniform data set reporting activity be... resources, hardware, software, and technical assistance to the Self-Governance Tribes to facilitate data...
Uramatsu, Masashi; Fujisawa, Yoshikazu; Mizuno, Shinya; Souma, Takahiro; Komatsubara, Akinori; Miki, Tamotsu
2017-01-01
Objectives We sought to clarify how large a proportion of fatal medical accidents can be considered to be caused by poor non-technical skills, and to support development of a policy to reduce number of such accidents by making recommendations about possible training requirements. Design Summaries of reports of fatal medical accidents, published by the Japan Medical Safety Research Organization, were reviewed individually. Three experienced clinicians and one patient safety expert conducted the reviews to determine the cause of death. Views of the patient safety expert were given additional weight in the overall determination. Setting A total of 73 summary reports of fatal medical accidents were reviewed. These reports had been submitted by healthcare organisations across Japan to the Japan Medical Safety Research Organization between April 2010 and March 2013. Primary and secondary outcome measures The cause of death in fatal medical accidents, categorised into technical skills, non-technical skills and inevitable progress of disease were evaluated. Non-technical skills were further subdivided into situation awareness, decision making, communication, team working, leadership, managing stress and coping with fatigue. Results Overall, the cause of death was identified as non-technical skills in 34 cases (46.6%), disease progression in 33 cases (45.2%) and technical skills in two cases (5.5%). In two cases, no consensual determination could be achieved. Further categorisation of cases of non-technical skills were identified as 14 cases (41.2%) of problems with situation awareness, eight (23.5%) with team working and three (8.8%) with decision making. These three subcategories, or combinations of them, were identified as the cause of death in 33 cases (97.1%). Conclusions Poor non-technical skills were considered to be a significant cause of adverse events in nearly half of the fatal medical accidents examined. Improving non-technical skills may be effective for reducing accidents, and training in particular subcategories of non-technical skills may be especially relevant. PMID:28209605
Career Clusters: Forecasting Demand for High School through College Jobs, 2008-2018
ERIC Educational Resources Information Center
Carnevale, Anthony P.; Smith, Nicole; Stone, James R., III; Kotamraju, Pradeep; Steuernagel, Bruce; Green, Kimberly A.
2011-01-01
This report presents data on job opportunities and skill requirements through 2018 arranged by the 16 career and technical education (CTE) career clusters in the Carl D. Perkins Act of 2006 (Perkins IV). These skill requirements reflect the length and extent of education and training required for the job. The authors detail changes in education…
DOT National Transportation Integrated Search
2016-07-01
Federal and state transportation planning statutory and regulatory laws require transportation projects to be : consistent with transportation plans and improvement programs before a federal action can be taken on a : project requiring one. Significa...
44 CFR 206.437 - State administrative plan.
Code of Federal Regulations, 2010 CFR
2010-10-01
... requests for advances of funds and reimbursement; (vii) Monitor and evaluate the progress and completion of... technical assistance as required to subgrantee(s); (xi) Comply with the administrative and audit requirements of 44 CFR parts 13 and 206; (xii) Provide quarterly progress reports to the Regional Administrator...
44 CFR 206.437 - State administrative plan.
Code of Federal Regulations, 2011 CFR
2011-10-01
... requests for advances of funds and reimbursement; (vii) Monitor and evaluate the progress and completion of... technical assistance as required to subgrantee(s); (xi) Comply with the administrative and audit requirements of 44 CFR parts 13 and 206; (xii) Provide quarterly progress reports to the Regional Administrator...
ERIC Educational Resources Information Center
Molenaar, Ivo W.
The technical problems involved in obtaining Bayesian model estimates for the regression parameters in m similar groups are studied. The available computer programs, BPREP (BASIC), and BAYREG, both written in FORTRAN, require an amount of computer processing that does not encourage regular use. These programs are analyzed so that the performance…
Translations on USSR Science and Technology Biomedical Sciences No. 12
1977-10-25
PUBLICATIONS JPRS publications may be ordered from the National Technical Information Service, Springfield, Virginia 22151. In order- ing, it is...Reports Announcements issued semi-monthly by the National Technical Information Service, and are listed in the Monthly Catalog of U.S. Government...hygienic norms and requirements into national economic practice. During the period 1971-1978 various stand- ards will be prepared within the CEMA
A Study of Placing Army Requirements on Contract
2016-04-01
perhaps being unable to control the external environment, has management authority over business and technical aspects of a specific program. The PM...research is the last element of the planning phase addressing both business and technical considerations. The acquisition team equips themselves with...report is the final product utilizing documented findings and supports the business strategy (DoD, Guidebook for the Acquisition of Services, 2011
Code of Federal Regulations, 2012 CFR
2012-01-01
... energy conservation measure, including renewable resource measures, shall keep all the records required... procedures; (2) For energy conservation measure projects: (i) Semi-annual progress reports. Two copies shall... project completion. Two copies of these reports shall be submitted, either both to the State energy agency...
Code of Federal Regulations, 2014 CFR
2014-01-01
... energy conservation measure, including renewable resource measures, shall keep all the records required... procedures; (2) For energy conservation measure projects: (i) Semi-annual progress reports. Two copies shall... project completion. Two copies of these reports shall be submitted, either both to the State energy agency...
Code of Federal Regulations, 2013 CFR
2013-01-01
... energy conservation measure, including renewable resource measures, shall keep all the records required... procedures; (2) For energy conservation measure projects: (i) Semi-annual progress reports. Two copies shall... project completion. Two copies of these reports shall be submitted, either both to the State energy agency...
Code of Federal Regulations, 2010 CFR
2010-01-01
... energy conservation measure, including renewable resource measures, shall keep all the records required... procedures; (2) For energy conservation measure projects: (i) Semi-annual progress reports. Two copies shall... project completion. Two copies of these reports shall be submitted, either both to the State energy agency...
Code of Federal Regulations, 2011 CFR
2011-01-01
... energy conservation measure, including renewable resource measures, shall keep all the records required... procedures; (2) For energy conservation measure projects: (i) Semi-annual progress reports. Two copies shall... project completion. Two copies of these reports shall be submitted, either both to the State energy agency...
NASA Technical Reports Server (NTRS)
Hammond, Dana P.
1991-01-01
The Technical Requirements Analysis and Control Systems (TRACS) software package is described. TRACS offers supplemental tools for the analysis, control, and interchange of project requirements. This package provides the fundamental capability to analyze and control requirements, serves a focal point for project requirements, and integrates a system that supports efficient and consistent operations. TRACS uses relational data base technology (ORACLE) in a stand alone or in a distributed environment that can be used to coordinate the activities required to support a project through its entire life cycle. TRACS uses a set of keyword and mouse driven screens (HyperCard) which imposes adherence through a controlled user interface. The user interface provides an interactive capability to interrogate the data base and to display or print project requirement information. TRACS has a limited report capability, but can be extended with PostScript conventions.
75 FR 13066 - Hazardous Waste Technical Corrections and Clarifications Rule
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-18
... comment will not take effect, and the reason for such withdrawals. We do not intend to institute a second... Environmental protection, Hazardous waste, Recycling, Reporting and recordkeeping requirements. 40 CFR Part 262... Part 266 Environmental protection, Energy, Hazardous waste, Recycling, Reporting and recordkeeping...
Report of the Technical Committee for Marketing.
ERIC Educational Resources Information Center
Oregon State Dept. of Education, Salem. Div. of Vocational Education.
This committee report identifies the skills and knowledge required by employees in the marketing occupational area. It also provides performance objectives from which competencies and instructional objectives may be developed. Introductory materials include a list of committee members, statement of the marketing committee, information on marketing…
State Revolving Funds: Financing Drought Resilient Water Infrastructure Projects
This report highlights innovative funding policies and programmatic actions that states are using to support drought resilient investment and operations through incentives, state requirements, and technical assistance.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-03-01
The module explains the connection between the Pollution Prevention Act and EPCRA. It details the reporting requirements under the Pollution Prevention Act, Section 6607(b) and lists the items to be included in source reduction reporting under Section 6607(b). It outlines the availability of technical assistance grant programs for states. It describes the information included in EPA`s biennial report to congress.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-09
...) How often the collection is required: Technical performance reports are required every six months... awarding grants and cooperative agreements (financial assistance) for the NRC. The Division of Contracts... provisions in order to administer NRC's financial assistance program. The information collected under the...
Site systems engineering fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.2
DOE Office of Scientific and Technical Information (OSTI.GOV)
GRYGIEL, M.L.
1998-10-08
Manage the Site Systems Engineering process to provide a traceable integrated requirements-driven, and technically defensible baseline. Through the Site Integration Group(SIG), Systems Engineering ensures integration of technical activities across all site projects. Systems Engineering's primary interfaces are with the RL Project Managers, the Project Direction Office and with the Project Major Subcontractors, as well as with the Site Planning organization. Systems Implementation: (1) Develops, maintains, and controls the site integrated technical baseline, ensures the Systems Engineering interfaces between projects are documented, and maintain the Site Environmental Management Specification. (2) Develops and uses dynamic simulation models for verification of the baselinemore » and analysis of alternatives. (3) Performs and documents fictional and requirements analyses. (4) Works with projects, technology management, and the SIG to identify and resolve technical issues. (5) Supports technical baseline information for the planning and budgeting of the Accelerated Cleanup Plan, Multi-Year Work Plans, Project Baseline Summaries as well as performance measure reporting. (6) Works with projects to ensure the quality of data in the technical baseline. (7) Develops, maintains and implements the site configuration management system.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nigro, D.N.
1979-07-01
The quarterly status report covers the period from 30 April 1979 through 31 July 1979 and is a summary of DDA activities for the effort performed on the procurement and delivery of eleven (11) Allison GT 404-4 gas turbine engines and five (5) HT740CT and six (6) V730CT Allison automatic transmissions and the required associated software. The contract requires the delivery of eleven (11) Allison GT 404-4 Industrial Gas Turbine Engines and five (5) HT740CT and six (6) V730CT Allison Automatic Transmissions for the Greyhound and Transit Coaches, respectively. In addition, software items such as cost reports, technical reports, installationmore » drawings, acceptance test data and parts lists are required. A recent decision by the DOE will modify the build configuration for the last four (4) Transit Coach engines. It was decided by the DOE at a meeting in Washington, DC on March 28, 1979 with representatives from DDA, NASA/LeRC, JPL and Booz-Allen and Hamilton that these engines will be built with ceramic regenerators. (TFD)« less
ERIC Educational Resources Information Center
Thurlow, Martha L.; Bremer, Chris; Albus, Deb
2011-01-01
This is the thirteenth annual report by the National Center on Educational Outcomes (NCEO) that analyzes public reporting practices of assessment data for students with disabilities in K-12 schools in the United States. The Individuals with Disabilities Education Act (IDEA) required states to disaggregate performance data at the state and district…
Forest Carbon Monitoring and Reporting for REDD+: What Future for Africa?
Gizachew, Belachew; Duguma, Lalisa A
2016-11-01
A climate change mitigation mechanism for emissions reduction from reduced deforestation and forest degradation, plus forest conservation, sustainable management of forest, and enhancement of carbon stocks (REDD+), has received an international political support in the climate change negotiations. The mechanism will require, among others, an unprecedented technical capacity for monitoring, reporting and verification of carbon emissions from the forest sector. A functional monitoring, reporting and verification requires inventories of forest area, carbon stock and changes, both for the construction of forest reference emissions level and compiling the report on the actual emissions, which are essentially lacking in developing countries, particularly in Africa. The purpose of this essay is to contribute to a better understanding of the state and prospects of forest monitoring and reporting in the context of REDD+ in Africa. We argue that monitoring and reporting capacities in Africa fall short of the stringent requirements of the methodological guidance for monitoring, reporting and verification for REDD+, and this may weaken the prospects for successfully implementing REDD+ in the continent. We presented the challenges and prospects in the national forest inventory, remote sensing and reporting infrastructures. A North-South, South-South collaboration as well as governments own investments in monitoring, reporting and verification system could help Africa leapfrog in monitoring and reporting. These could be delivered through negotiations for the transfer of technology, technical capacities, and experiences that exist among developed countries that traditionally compile forest carbon reports in the context of the Kyoto protocol.
ERIC Educational Resources Information Center
Crandall, William H.; Niesl, Joseph
A study of 2-year associate degree commercial arts programs in Wisconsin was conducted to determine the entry-level job requirements of commercial artists on a statewide basis; to identify skill tasks, performance levels, and learning experiences required of commercial artists; to evaluate the relevance of 2-year programs to industry requirements;…
Curtis H. Flather; Michael S. Knowles; Jason McNees
2008-01-01
This technical document supports the Forest Service's requirement to assess the status of renewable natural resources as mandated by the Forest and Rangeland Renewable Resources Planning Act of 1974. It updates past reports on the trends and geographic patterns of species formally listed as threatened or endangered under the Endangered Species Act of 1973. We...
ERIC Educational Resources Information Center
Lyons, Thomas M.; Knight, Glen A.
A model project was conducted to demonstrate how Chrysler, in partnership with the education community and the government, could provide technical training to enable displaced workers to contribute to the "H-Body" car launch, to improve their job skills, and to enhance their future employability. The training was conducted on a pilot…
ERIC Educational Resources Information Center
CNA Corporation, 2005
2005-01-01
The Secretary of the U.S. Department of Education (ED) appointed eleven members to the Appalachian Regional Advisory Committee (AP RAC) to provide advice concerning the educational needs of the region as required by the Educational Technical Assistance Act of 2002 (Public Law 107-279; 20 USC 9605). The RAC was charged with providing this advice…
Scientific and Technical Information. Handbook for Technical Report Preparation
1991-05-31
31................. 16 Typography .......................................... 32.... ... ........ 16 Section Vill--REQUIREMENTS...marks. 16 AFDTCP 83-2 31 May 1991 SECTION VII ERRATA/ TYPOGRAPHY 31. ERRATA. Errors are normally corrected during proofing. If an error does-become... TYPOGRAPHY : a. Paper Size and Image Area. Paper size will be 8 1/2 by irc.• .,,.;od quality 50-pound white bond stock. The image area should be 6 1/2- by 8 3/4
40 CFR 63.103 - General compliance, reporting, and recordkeeping provisions.
Code of Federal Regulations, 2012 CFR
2012-07-01
... justifying the owner or operator's request for a waiver, such as the technical or economic infeasibility, or... applicable reports and records required by subparts F, G, and H of this part for at least 5 years; except... operator submits copies of reports to the applicable EPA Regional Office, the owner or operator is not...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Shoemaker, Paul E.; Hardin, Ernest; Park, HeeHo Daniel
The subject report from High Bridge Associates (HBA) was issued on March 2, 2016, in reaction to a U.S. Department of Energy (DOE) program decision to pursue down-blending of surplus Pu and geologic disposal at the Waste Isolation Pilot Plant (WIPP). Sandia National Laboratories was requested by the DOE to review the technical arguments presented in the HBA report. Specifically, this review is organized around three technical topics: criticality safety, radiological release limits, and thermal impacts. Questions raised by the report pertaining to legal and regulatory requirements, safeguards and security, international agreements, and costing of alternatives, are beyond the scopemore » of this review.« less
Using Time-Phased Casualty Estimates to Determine Medical Resupply Requirements
2006-09-18
calculated from the list of tasks. The RSVP-planned MTF laydown would be replaced by the reporting MTF with a known location. One advantage of...Another advantage is the ability to adapt quickly to changing requirements. Supplies that are used at a faster than initially forecast rate will...Officer ( GMO ) Platforms. San Diego, Calif: Naval Health Research Center; 2001. Technical Report No. 01-18. 5. Galarneau MR, Pang G, Konoske PJ
Technical support for Life Sciences communities on a production grid infrastructure.
Michel, Franck; Montagnat, Johan; Glatard, Tristan
2012-01-01
Production operation of large distributed computing infrastructures (DCI) still requires a lot of human intervention to reach acceptable quality of service. This may be achievable for scientific communities with solid IT support, but it remains a show-stopper for others. Some application execution environments are used to hide runtime technical issues from end users. But they mostly aim at fault-tolerance rather than incident resolution, and their operation still requires substantial manpower. A longer-term support activity is thus needed to ensure sustained quality of service for Virtual Organisations (VO). This paper describes how the biomed VO has addressed this challenge by setting up a technical support team. Its organisation, tooling, daily tasks, and procedures are described. Results are shown in terms of resource usage by end users, amount of reported incidents, and developed software tools. Based on our experience, we suggest ways to measure the impact of the technical support, perspectives to decrease its human cost and make it more community-specific.
A Common Postsecondary Data Dictionary for Perkins Accountability
ERIC Educational Resources Information Center
Kotamraju, Pradeep; Richards, Amanda; Wun, Jolene; Klein, Steven G.
2010-01-01
This project assesses the feasibility of creating a voluntary, nationwide data dictionary that can be used to standardize the reporting of postsecondary accountability reporting requirements for the Carl D. Perkins Career and Technical Education Act of 2006 (otherwise known as Perkins IV). Variables, field codes, and programming instructions,…
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
Pursuant to the Atomic Energy Act of 1954, as amended, and the Economy Act of 1932, the Department of Energy and its semi-autonomous National Nuclear Security Administration (NNSA) provide research and technical assistance to other Federal agencies on a reimbursable, full cost recovery basis through the Work for Others (WFO) program. For the vast majority of WFO technical projects, Department Federal officials furnish administrative project oversight while the actual detailed scientific or technical work is completed by the Department's 'management and operating' contractors. These contractors are awarded a special contract type specifically created under the Federal Acquisition Regulation to managemore » and operate Department sites and facilities, including sophisticated laboratories and technical centers, on a government-owned, contractor-operated basis. With annual expenditures exceeding $1 billion, the Department of Defense (DoD) is one of the Department's largest WFO customers. Work performed for DoD at the Department's national laboratories and other facilities includes highly technical research in areas such as nuclear weapons systems, counter-terrorism, and in-theater troop support. The National Defense Authorization Act for Fiscal Year (FY) 2009, required the Inspectors General of the DoD and the Department to review procurement methods to determine whether the Department complied with DoD procurement requirements and/or whether alternative procurement policies were in place. In response, we focused our review on projects performed by NNSA because it completes the vast majority (approximately $900 million in FY 2008) of the Department's work for DoD. As part of this effort, and, at the specific request of the DoD Office of Inspector General (DoD OIG), we identified the universe of WFO technical projects that received new funding in the fourth quarter of FY 2008 at NNSA sites. We independently reviewed a judgmental sample of 11 projects selected by the DoD OIG to meet the objectives of this audit. Our review revealed that NNSA managed DoD WFO technical projects in a manner consistent with requirements of the Atomic Energy Act of 1954, the Federal Acquisition Regulation, and the Department's implementing guidance, the Department of Energy Acquisition Regulation. Because of the very nature of the Department's management and operating contracting model, WFO projects may not be technically compliant with DoD procurement regulations in certain instances. We found that NNSA did not let new contracts or task orders for the DoD WFO technical projects we reviewed and instead managed them under its existing internal control process as part of its management and operating contract structure. In one instance, we noted that the Department had, at DoD's request, supplemented its control structure to incorporate specific DoD procurement requirements. Senior Department of Energy procurement officials acknowledged that neither the Department nor NNSA modified their existing prime contracts to incorporate specific defense procurement requirements because such modifications would be inappropriate, costly, and inefficient. In short, they informed us that the Department had developed and implemented a series of controls designed to monitor overall contractor performance, including WFO technical projects. Department and NNSA officials noted, however, that they were willing to incorporate DoD specific requirements into work orders should DoD request and fund such efforts. Additional details regarding management of WFO technical projects are discussed in the body of this report.« less
The Technical Work Plan Tracking Tool
NASA Technical Reports Server (NTRS)
Chullen, Cinda; Leighton, Adele; Weller, Richard A.; Woodfill, Jared; Parkman, William E.; Ellis, Glenn L.; Wilson, Marilyn M.
2003-01-01
The Technical Work Plan Tracking Tool is a web-based application that enables interactive communication and approval of contract requirements that pertain to the administration of the Science, Engineering, Analysis, and Test (SEAT) contract at Johnson Space Center. The implementation of the application has (1) shortened the Technical Work Plan approval process, (2) facilitated writing and documenting requirements in a performance-based environment with associated surveillance plans, (3) simplified the contractor s estimate of the cost for the required work, and (4) allowed for the contractor to document how they plan to accomplish the work. The application is accessible to over 300 designated NASA and contractor employees via two Web sites. For each employee, the application regulates access according to the employee s authority to enter, view, and/or print out diverse information, including reports, work plans, purchase orders, and financial data. Advanced features of this application include on-line approval capability, automatic e-mail notifications requesting review by subsequent approvers, and security inside and outside the firewall.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bahramipour, Phillip F.; Festa, Steven; Biswal, Rajiv
Though polycystic liver disease (PCLD) has historically been considered a contraindication to TIPS, we present a case where technically successful shunt creation was achieved without the need for modification of the standard TIPS procedure, as was required in a previous report.
Feasibility Study to Identify Potential Reductions in Energy Use in Tribal Buildings
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stevens, Willie
Under this project, the Confederated Salish and Kootenai Tribes (CSKT) assessed the technical and economic feasibility of energy efficiency improvements to existing Tribally-owned buildings. The feasibility study followed a systematic approach in identifying, selecting, and ranking recommended measures, recognizing that the appropriateness of a measure would depend not only on technical issues but also on institutional and organizational issues, such as financing options and occupant requirements. The completed study provided the Tribes with the information needed to commit necessary resources to reduce the energy use and cost in approximately 40 Tribal buildings, including the changes that may be needed inmore » each facility’s operation and maintenance and personnel requirements. It also presented an economic analysis of energy-efficiency capital improvements and an annotated list of financing options and possible funding sources for implementation and an overall strategy for implementation. This project was located in various Tribal communities located throughout the Flathead Indian Reservation in Western Montana. Notice: The following is a compilation of Annual Program Review Presentations, Award Modifications, and Quarterly Progress Reports submitted to the Department of Energy’s (DOE) Office of Indian Energy Policy and Programs by the Confederated Salish and Kootenai Tribes under agreement DE-EE0005171. This report covers project activities from September 30, 2011 through December 31, 2014 and has been uploaded to OSTI by DOE as a substitute for the required Final Technical Report which was not received by DOE from the project recipient.« less
NASA Astrophysics Data System (ADS)
Dingwall, B. J.
2015-12-01
NASA's Science Mission Directorate (SMD) recognizes that suborbital carriers play a vital role in training our country's future science and technology leaders. SMD created the Undergraduate Student Instrument Project (USIP) to offer students the opportunity to design, build, and fly instruments on NASA's unique suborbital research platforms. This paper explores the projects, the impact, and the lessons learned of USIP. USIP required undergraduate teams to design, build, and fly a scientific instrument in 18 months or less. Students were required to form collaborative multidisciplinary teams to design, develop and build their instrument. Teams quickly learned that success required skills often overlooked in an academic environment. Teams quickly learned to share technical information in a clear and concise manner that could be understood by other disciplines. The aggressive schedule required team members to hold each other accountable for progress while maintaining team unity. Unanticipated problems and technical issues led students to a deeper understanding of the need for schedule and cost reserves. Students exited the program with a far deeper understanding of project management and team dynamics. Through the process of designing and building an instrument that will enable new research transforms students from textbook learners to developers of new knowledge. The initial USIP project funded 10 undergraduate teams that flew a broad range of scientific instruments on scientific balloons, sounding rockets, commercial rockets and aircraft. Students were required to prepare for and conduct the major reviews that are an integral part of systems development. Each project conducted a Preliminary Design Review, Critical Design Review and Mission Readiness review for NASA officials and flight platform providers. By preparing and presenting their designs to technical experts, the students developed a deeper understanding of the technical and programmatic project pieces that were necessary for success. A student survey was conducted to assess the impact of USIP. Over 90% of students reported a significant improvement in their technical and project management skills. Perhaps more importantly, 88% of students reported that they have a far better appreciation for the value of multi-disciplinary teams.
Berger, David L.; Halford, Keith J.; Belcher, Wayne R.; Lico, Michael S.
2008-01-01
The Nevada State Engineer in Ruling No. 5181 required Lincoln County and Vidler Water Company, Inc., to provide results from additional water-resources studies of Tule Desert in southern Nevada to support water-rights application 64692. As outlined by the ruling, the additional studies were to include the determination of the amount of ground water available from the Tule Desert basin, ground-water recharge to the Tule Desert, and the direction of ground-water flow. Results of these additional studies were published in five reports prepared for Lincoln County and Vidler Water Company, Inc. The National Park Service formally requested that the U.S. Geological Survey provide technical reviews of these five reports. The Nevada State Engineer in Ruling No. 5181 required Lincoln County and Vidler Water Company, Inc., to provide results from additional water-resources studies of Tule Desert in southern Nevada to support water-rights application 64692. As outlined by the ruling, the additional studies were to include the determination of the amount of ground water available from the Tule Desert basin, ground-water recharge to the Tule Desert, and the direction of ground-water flow. Results of these additional studies were published in five reports prepared for Lincoln County and Vidler Water Company, Inc. The National Park Service formally requested that the U.S. Geological Survey provide technical reviews of these five reports.
Hanford business structure for HANDI 2000 business management system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wilson, D.
The Hanford Business Structure integrates the project`s technical, schedule, and cost baselines; implements the use of a standard code of accounts; and streamlines performance reporting and cost collection. Technical requirements drive the technical functions and come from the RDD 100 database. The functions will be identified in the P3 scheduling system and also in the PeopleSoft system. Projects will break their work down from the technical requirements in the P3 schedules. When the level at which they want to track cost via the code of accounts is reached, a Project ID will be generated in the PeopleSoft system. P3 maymore » carry more detailed schedules below the Project ID level. The standard code of accounts will identify discrete work activities done across the site and various projects. They will include direct and overhead type work scopes. Activities in P3 will roll up to this standard code of accounts. The field that will be used to record this in PeopleSoft is ``Activity``. In Passport it is a user-defined field. It will have to be added to other feeder systems. Project ID and code of accounts are required fields on all cost records.« less
Evaluation of Cabin Crew Technical Knowledge
NASA Technical Reports Server (NTRS)
Dunbar, Melisa G.; Chute, Rebecca D.; Jordan, Kevin
1998-01-01
Accident and incident reports have indicated that flight attendants have numerous opportunities to provide the flight-deck crew with operational information that may prevent or essen the severity of a potential problem. Additionally, as carrier fleets transition from three person to two person flight-deck crews, the reliance upon the cabin crew for the transfer of this information may increase further. Recent research (Chute & Wiener, 1996) indicates that light attendants do not feel confident in their ability to describe mechanical parts or malfunctions of the aircraft, and the lack of flight attendant technical training has been referenced in a number of recent reports (National Transportation Safety Board, 1992; Transportation Safety Board of Canada, 1995; Chute & Wiener, 1996). The present study explored both flight attendant technical knowledge and flight attendant and dot expectations of flight attendant technical knowledge. To assess the technical knowledge if cabin crewmembers, 177 current flight attendants from two U.S. carriers voluntarily :ompleted a 13-item technical quiz. To investigate expectations of flight attendant technical knowledge, 181 pilots and a second sample of 96 flight attendants, from the same two airlines, completed surveys designed to capture each group's expectations of operational knowledge required of flight attendants. Analyses revealed several discrepancies between the present level of flight attendants.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-26
... information, including definitions. Chapter T2 contains scoping requirements that specify what vehicle... technical requirements for those vehicles will be added to Chapters T2 through T8. Each chapter is arranged... Development and Evaluation of Countermeasures,'' Report No. FHWA-RD-79-3 Prepared for the Federal Highway...
45 CFR 162.1802 - Standards for coordination of benefits information transaction.
Code of Federal Regulations, 2012 CFR
2012-10-01
....) (ii) The ASC X12 Standards for Electronic Data Interchange Technical Report Type 3—Health Care Claim... DATA STANDARDS AND RELATED REQUIREMENTS ADMINISTRATIVE REQUIREMENTS Coordination of Benefits § 162.1802....1) for the NCPDP Data Record in the Detail Data Record. (Incorporated by reference in § 162.920). (2...
45 CFR 162.1802 - Standards for coordination of benefits information transaction.
Code of Federal Regulations, 2011 CFR
2011-10-01
....) (ii) The ASC X12 Standards for Electronic Data Interchange Technical Report Type 3—Health Care Claim... DATA STANDARDS AND RELATED REQUIREMENTS ADMINISTRATIVE REQUIREMENTS Coordination of Benefits § 162.1802....1) for the NCPDP Data Record in the Detail Data Record. (Incorporated by reference in § 162.920). (2...
45 CFR 162.1802 - Standards for coordination of benefits information transaction.
Code of Federal Regulations, 2013 CFR
2013-10-01
....) (ii) The ASC X12 Standards for Electronic Data Interchange Technical Report Type 3—Health Care Claim... DATA STANDARDS AND RELATED REQUIREMENTS ADMINISTRATIVE REQUIREMENTS Coordination of Benefits § 162.1802....1) for the NCPDP Data Record in the Detail Data Record. (Incorporated by reference in § 162.920). (2...
40 CFR 63.95 - Additional approval criteria for accidental release prevention programs.
Code of Federal Regulations, 2011 CFR
2011-07-01
... basis. (3) Procedures for reviewing risk management plans and providing technical assistance to... chapter; and (ii) A requirement that any source subject to the State's part 68 program submit a Risk Management Plan (RMP) that reports at least the same information in the same format as required under part 68...
40 CFR 63.95 - Additional approval criteria for accidental release prevention programs.
Code of Federal Regulations, 2010 CFR
2010-07-01
... basis. (3) Procedures for reviewing risk management plans and providing technical assistance to... chapter; and (ii) A requirement that any source subject to the State's part 68 program submit a Risk Management Plan (RMP) that reports at least the same information in the same format as required under part 68...
COL Application Content Guide for HTGRs: Revision to RG 1.206, Part 1 - Status Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wayne Moe
2012-08-01
A combined license (COL) application is required by the Nuclear Regulatory Commission (NRC) for all proposed nuclear plants. The information requirements for a COL application are set forth in 10 CFR 52.79, “Contents of Applications; Technical Information in Final Safety Analysis Report.” An applicant for a modular high temperature gas-cooled reactor (HTGR) must develop and submit for NRC review and approval a COL application which conforms to these requirements. The technical information necessary to allow NRC staff to evaluate a COL application and resolve all safety issues related to a proposed nuclear plant is detailed and comprehensive. To this, Regulatorymore » Guide (RG) 1.206, “Combined License Applications for Nuclear Power Plants” (LWR Edition), was developed to assist light water reactor (LWR) applicants in incorporating and effectively formatting required information for COL application review (Ref. 1). However, the guidance prescribed in RG 1.206 presumes a LWR design proposal consistent with the systems and functions associated with large LWR power plants currently operating under NRC license.« less
Curtis H. Flather; Michael S. Knowles; Stephen J. Brady
2009-01-01
This technical document supports the Forest Service's requirement to assess the status of renewable natural resources as mandated by the Forest and Rangeland Renewable Resources Planning Act of 1974 (RPA). It updates past reports on national and regional trends in population and harvest estimates for species classified as big game and small game. The trends...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Branch, Kristi M.; Baker, Kathryn A.
A technical letter report to the NRC summarizing the findings of a benchmarking study, literature review, and workshop with experts on current industry standards and expert judgments about needs for security during the construction phase of critical infrastructure facilities in the post-September 11 U.S. context, with a special focus on the construction phase of nuclear power plants and personnel security measures.
10 CFR 76.87 - Technical safety requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Technical safety requirements. 76.87 Section 76.87 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) CERTIFICATION OF GASEOUS DIFFUSION PLANTS Safety § 76.87 Technical safety requirements. (a) The Corporation shall establish technical safety requirements. In...
10 CFR 76.87 - Technical safety requirements.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 2 2012-01-01 2012-01-01 false Technical safety requirements. 76.87 Section 76.87 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) CERTIFICATION OF GASEOUS DIFFUSION PLANTS Safety § 76.87 Technical safety requirements. (a) The Corporation shall establish technical safety requirements. In...
10 CFR 76.87 - Technical safety requirements.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 2 2011-01-01 2011-01-01 false Technical safety requirements. 76.87 Section 76.87 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) CERTIFICATION OF GASEOUS DIFFUSION PLANTS Safety § 76.87 Technical safety requirements. (a) The Corporation shall establish technical safety requirements. In...
10 CFR 76.87 - Technical safety requirements.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 2 2013-01-01 2013-01-01 false Technical safety requirements. 76.87 Section 76.87 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) CERTIFICATION OF GASEOUS DIFFUSION PLANTS Safety § 76.87 Technical safety requirements. (a) The Corporation shall establish technical safety requirements. In...
10 CFR 76.87 - Technical safety requirements.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 2 2014-01-01 2014-01-01 false Technical safety requirements. 76.87 Section 76.87 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) CERTIFICATION OF GASEOUS DIFFUSION PLANTS Safety § 76.87 Technical safety requirements. (a) The Corporation shall establish technical safety requirements. In...
Uramatsu, Masashi; Fujisawa, Yoshikazu; Mizuno, Shinya; Souma, Takahiro; Komatsubara, Akinori; Miki, Tamotsu
2017-02-16
We sought to clarify how large a proportion of fatal medical accidents can be considered to be caused by poor non-technical skills, and to support development of a policy to reduce number of such accidents by making recommendations about possible training requirements. Summaries of reports of fatal medical accidents, published by the Japan Medical Safety Research Organization, were reviewed individually. Three experienced clinicians and one patient safety expert conducted the reviews to determine the cause of death. Views of the patient safety expert were given additional weight in the overall determination. A total of 73 summary reports of fatal medical accidents were reviewed. These reports had been submitted by healthcare organisations across Japan to the Japan Medical Safety Research Organization between April 2010 and March 2013. The cause of death in fatal medical accidents, categorised into technical skills, non-technical skills and inevitable progress of disease were evaluated. Non-technical skills were further subdivided into situation awareness, decision making, communication, team working, leadership, managing stress and coping with fatigue. Overall, the cause of death was identified as non-technical skills in 34 cases (46.6%), disease progression in 33 cases (45.2%) and technical skills in two cases (5.5%). In two cases, no consensual determination could be achieved. Further categorisation of cases of non-technical skills were identified as 14 cases (41.2%) of problems with situation awareness, eight (23.5%) with team working and three (8.8%) with decision making. These three subcategories, or combinations of them, were identified as the cause of death in 33 cases (97.1%). Poor non-technical skills were considered to be a significant cause of adverse events in nearly half of the fatal medical accidents examined. Improving non-technical skills may be effective for reducing accidents, and training in particular subcategories of non-technical skills may be especially relevant. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/.
Wind-turbine-performance assessment
NASA Astrophysics Data System (ADS)
Vachon, W. A.
1982-06-01
An updated summary of recent test data and experiences is reported from both federally and privately funded large wind turbine (WT) development and test programs, and from key WT programs in Europe. Progress and experiences on both the cluster of three MOD-2 2.5-MW WT's, the MOD-1 2-MW WT, and other WT installations are described. An examination of recent test experiences and plans from approximately five privately funded large WT programs in the United States indicates that, during machine checkout and startup, technical problems are identified, which require and startup, a number of technical problems are identified, which will require design changes and create program delays.
Technical options for processing additional light tight oil volumes within the United States
2015-01-01
This report examines technical options for processing additional LTO volumes within the United States. Domestic processing of additional LTO would enable an increase in petroleum product exports from the United States, already the world’s largest net exporter of petroleum products. Unlike crude oil, products are not subject to export limitations or licensing requirements. While this is one possible approach to absorbing higher domestic LTO production in the absence of a relaxation of current limitations on crude exports, domestic LTO would have to be priced at a level required to encourage additional LTO runs at existing refinery units, debottlenecking, or possible additions of processing capacity.
NASA Technical Reports Server (NTRS)
Keitz, E. L.
1978-01-01
Volume 1 of a three volume report issued as MITRE/METREX Technical Report is presented. This volume contains a synthesis of the results of two previous MITRE/METREX studies and an update of the information. These studies deal with a comprehensive review of stratospheric trace constituent measurement requirements. The scope of the study was restricted to those contituents which fall into the general category of air pollutants.
10 CFR 830.205 - Technical safety requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... must: (1) Develop technical safety requirements that are derived from the documented safety analysis... 10 Energy 4 2010-01-01 2010-01-01 false Technical safety requirements. 830.205 Section 830.205 Energy DEPARTMENT OF ENERGY NUCLEAR SAFETY MANAGEMENT Safety Basis Requirements § 830.205 Technical...
10 CFR 830.205 - Technical safety requirements.
Code of Federal Regulations, 2011 CFR
2011-01-01
... must: (1) Develop technical safety requirements that are derived from the documented safety analysis... 10 Energy 4 2011-01-01 2011-01-01 false Technical safety requirements. 830.205 Section 830.205 Energy DEPARTMENT OF ENERGY NUCLEAR SAFETY MANAGEMENT Safety Basis Requirements § 830.205 Technical...
Process of videotape making: presentation design, software, and hardware
NASA Astrophysics Data System (ADS)
Dickinson, Robert R.; Brady, Dan R.; Bennison, Tim; Burns, Thomas; Pines, Sheldon
1991-06-01
The use of technical video tape presentations for communicating abstractions of complex data is now becoming commonplace. While the use of video tapes in the day-to-day work of scientists and engineers is still in its infancy, their use as applications oriented conferences is now growing rapidly. Despite these advancements, there is still very little that is written down about the process of making technical videotapes. For printed media, different presentation styles are well known for categories such as results reports, executive summary reports, and technical papers and articles. In this paper, the authors present ideas on the topic of technical videotape presentation design in a format that is worth referring to. They have started to document the ways in which the experience of media specialist, teaching professionals, and character animators can be applied to scientific animation. Software and hardware considerations are also discussed. For this portion, distinctions are drawn between the software and hardware required for computer animation (frame at a time) productions, and live recorded interaction with a computer graphics display.
10 CFR 603.885 - Updated program plans and budgets.
Code of Federal Regulations, 2011 CFR
2011-01-01
... program plans and budgets. In addition to reports on progress to date, a TIA may include a provision requiring the recipient to annually prepare an updated technical plan for future conduct of the research...
Airport Surface Control Systems Development Analysis Expanded
DOT National Transportation Integrated Search
1990-01-01
A previous MITRE Technical Report, Airport Surface Traffic Control Systems Deployment Analysis, FAA-RD-74-6, presented an analysis of ASTC (Airport Surface Traffic Control) system requirements and developed estimates of the deployment potential of pr...
A Synthesis of Literature on the Effectiveness of Community Orders. Technical Report Summary
ERIC Educational Resources Information Center
Davis, Robert; Rabinovich, Lila; Rubin, Jennifer; Kilmer, Beau; Heaton, Paul
2008-01-01
The U.K. National Audit Office (NAO) commissioned RAND Europe to conduct this review to identify and synthesize international research about the effectiveness of community orders in reducing re-offending. In this report, we review research on ten of the common requirements contained in community orders. Through examining reviews, systematic…
A Synthesis of Literature on the Effectiveness of Community Orders. Technical Report
ERIC Educational Resources Information Center
Davis, Robert; Rabinovich, Lila; Rubin, Jennifer; Kilmer, Beau; Heaton, Paul
2008-01-01
The U.K. National Audit Office (NAO) commissioned RAND Europe to conduct this review to identify and synthesize international research about the effectiveness of community orders in reducing re-offending. In this report, we review research on ten of the common requirements contained in community orders. Through examining reviews, systematic…
The Oregon Applied Academics Project: Final Report
ERIC Educational Resources Information Center
Pearson, Donna; Richardson, George B.; Sawyer, Jennifer M.
2013-01-01
This report contains the findings of the Oregon Applied Academics research and development project which spanned three academic years from 2010 through 2013. The overall purpose of the project was to develop and implement a technical math course that would meet graduation requirements and improve student performance. The State of Oregon has been…
40 CFR 35.4170 - What kinds of reporting does EPA require?
Code of Federal Regulations, 2011 CFR
2011-07-01
... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Technical Assistance Managing Your Tag... period which ends June 30 and December 31 of each year. (b) [Reserved] (c) Progress Report Full description in chart or narrative format of the progress your group made in relation to your approved schedule...
ADAAG Review Federal Advisory Committee Recommendations for a New ADAAG. Final Report.
ERIC Educational Resources Information Center
Architectural and Transportation Barriers Compliance Board, Washington, DC.
This report presents the final recommendations, in the form of a new set of guidelines, of a federal advisory committee concerning revisions to the Americans with Disabilities Act Accessibility Guidelines (ADAAG). The guidelines provide scoping and technical requirements for the design, construction, and alteration of sites, facilities, buildings,…
LDRD 2017 Annual Report: Laboratory Directed Research and Development Program Activities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Anderson, Jack; Flynn, Liz
This report provides a detailed look at the scientific and technical activities for each of the LDRD projects funded by BNL in FY 2017, as required. In FY 2017, the BNL LDRD Program funded 46 projects, 13 of which were new starts, at a total cost of $10.4M.
ERIC Educational Resources Information Center
Hospital Research and Educational Trust, Chicago, IL.
THE FIRST SECTION OF THIS REPORT ON PROGRAMED INSTRUCTION IN THE HEALTH CARE FIELD EXAMINES THE HOSPITAL MILIEU AND SUCH PROBLEMS AS PERSONNEL SHORTAGES, INCREASING SPECIALIZATION, AND STRICT TECHNICAL AND EDUCATIONAL REQUIREMENTS. THE SECOND SECTION REVIEWS SOME RECENT ADVANCES IN BEHAVIORAL TECHNOLOGY, FUNDAMENTAL PRINCIPLES OF TEACHING…
ERIC Educational Resources Information Center
Jones, Earl I., Ed.
This five-section symposium report includes 22 papers assessing the state-of-the-art in occupational research. Section 1, Occupational Analysis, Structure, and Methods, contains four papers that discuss: the Air Force Occupational Research project, methodologies in job analysis, evaluation, structures and requirements, career development,…
Research Disclosure Procedures for the Kamehameha Early Education Project. Technical Report #21.
ERIC Educational Resources Information Center
Omori, Sharon; And Others
This report describes research disclosure procedures and materials developed for the Kamehameha Early Education Program (KEEP) to fulfill the informed consent principle of the ethical guidelines of the American Psychological Association. A requirement for registration of children in the program is that parents attend one of two disclosure…
Job-Derived Selection: Follow Up Report. Technical Report No. 4.
ERIC Educational Resources Information Center
McCormick, Ernest J.; And Others
A study dealt with the use of the Position Analysis Questionnaire (PAQ) within a job component validity framework as the basis for estimating aptitude requirements of jobs represented by scores on commercially available tests as contrasted with scores on General Aptitude Test Battery (GATB) tests. Procedures generally consisted of the use of job…
Apollo experience report: The AN/ARD-17 direction finding system
NASA Technical Reports Server (NTRS)
Chase, W. R.; Middleton, W. A.
1975-01-01
This report contains a statement of the operational philosophy and requirements leading to the development of the AN/ARD-17 direction-finding system. The technical problems encountered and the solutions devised in the AN/ARD-17 development are discussed. An evaluation of the system under actual operational conditions is included.
Adult Education and Literacy. Program Year 2015 Annual Report
ERIC Educational Resources Information Center
Iowa Department of Education, 2016
2016-01-01
This report is Iowa's response to the four questions that the United States Department of Education, Office of Career, Technical, and Adult Education (OCTAE), requires of all states and territories receiving federal funding through the Workforce Investment Act (WIA), Title II, Adult Education and Family Literacy Act (AEFLA). The overall goal of…
29 CFR 2520.103-2 - Contents of the annual report for a group insurance arrangement.
Code of Federal Regulations, 2013 CFR
2013-07-01
...), if such financial statements are prepared in order for the independent qualified public accountant to... administrator.” (5) A report of an independent qualified public accountant. (i) Technical requirements. The accountant's report— (A) Shall be dated; (B) Shall be signed manually; (C) Shall indicate the city and State...
29 CFR 2520.103-2 - Contents of the annual report for a group insurance arrangement.
Code of Federal Regulations, 2011 CFR
2011-07-01
...), if such financial statements are prepared in order for the independent qualified public accountant to... administrator.” (5) A report of an independent qualified public accountant. (i) Technical requirements. The accountant's report— (A) Shall be dated; (B) Shall be signed manually; (C) Shall indicate the city and State...
29 CFR 2520.103-2 - Contents of the annual report for a group insurance arrangement.
Code of Federal Regulations, 2012 CFR
2012-07-01
...), if such financial statements are prepared in order for the independent qualified public accountant to... administrator.” (5) A report of an independent qualified public accountant. (i) Technical requirements. The accountant's report— (A) Shall be dated; (B) Shall be signed manually; (C) Shall indicate the city and State...
29 CFR 2520.103-2 - Contents of the annual report for a group insurance arrangement.
Code of Federal Regulations, 2010 CFR
2010-07-01
...), if such financial statements are prepared in order for the independent qualified public accountant to... administrator.” (5) A report of an independent qualified public accountant. (i) Technical requirements. The accountant's report— (A) Shall be dated; (B) Shall be signed manually; (C) Shall indicate the city and State...
29 CFR 2520.103-2 - Contents of the annual report for a group insurance arrangement.
Code of Federal Regulations, 2014 CFR
2014-07-01
...), if such financial statements are prepared in order for the independent qualified public accountant to... administrator.” (5) A report of an independent qualified public accountant. (i) Technical requirements. The accountant's report— (A) Shall be dated; (B) Shall be signed manually; (C) Shall indicate the city and State...
Technical Assistance for Southwest Solar Technologies Inc. Final Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Munoz-Ramos, Karina; Brainard, James Robert; McIntyre, Annie
2012-07-01
Southwest Solar Technologies Inc. is constructing a Solar-Fuel Hybrid Turbine energy system. This innovative energy system combines solar thermal energy with compressed air energy storage and natural gas fuel backup capability to provide firm, non-intermittent power. In addition, the energy system will have very little impact on the environment since, unlike other Concentrated Solar Power (CSP) technologies, it requires minimal water. In 2008 Southwest Solar Technologies received a Solar America Showcase award from the Department of Energy for Technical Assistance from Sandia National Laboratories. This report details the work performed as part of the Solar America Showcase award for Southwestmore » Solar Technologies. After many meetings and visits between Sandia National Labs and Southwest Solar Technologies, several tasks were identified as part of the Technical Assistance and the analysis and results for these are included here.« less
Sustained Assessment Metadata as a Pathway to Trustworthiness of Climate Science Information
NASA Astrophysics Data System (ADS)
Champion, S. M.; Kunkel, K.
2017-12-01
The Sustained Assessment process has produced a suite of climate change reports: The Third National Climate Assessment (NCA3), Regional Surface Climate Conditions in CMIP3 and CMIP5 for the United States: Differences, Similarities, and Implications for the U.S. National Climate Assessment, Impacts of Climate Change on Human Health in the United States: A Scientific Assessment, The State Climate Summaries, as well as the anticipated Climate Science Special Report and Fourth National Climate Assessment. Not only are these groundbreaking reports of climate change science, they are also the first suite of climate science reports to provide access to complex metadata directly connected to the report figures and graphics products. While the basic metadata documentation requirement is federally mandated through a series of federal guidelines as a part of the Information Quality Act, Sustained Assessment products are also deemed Highly Influential Scientific Assessments, which further requires demonstration of the transparency and reproducibility of the content. To meet these requirements, the Technical Support Unit (TSU) for the Sustained Assessment embarked on building a system for not only collecting and documenting metadata to the required standards, but one that also provides consumers unprecedented access to the underlying data and methods. As our process and documentation have evolved, the value of both continue to grow in parallel with the consumer expectation of quality, accessible climate science information. This presentation will detail the how the TSU accomplishes the mandated requirements with their metadata collection and documentation process, as well as the technical solution designed to demonstrate compliance while also providing access to the content for the general public. We will also illustrate how our accessibility platforms guide consumers through the Assessment science at a level of transparency that builds trust and confidence in the report content.
2016-12-30
The Drug Enforcement Administration is updating its regulations for the import and export of tableting and encapsulating machines, controlled substances, and listed chemicals, and its regulations relating to reports required for domestic transactions in listed chemicals, gamma-hydroxybutyric acid, and tableting and encapsulating machines. In accordance with Executive Order 13563, the Drug Enforcement Administration has reviewed its import and export regulations and reporting requirements for domestic transactions in listed chemicals (and gamma-hydroxybutyric acid) and tableting and encapsulating machines, and evaluated them for clarity, consistency, continued accuracy, and effectiveness. The amendments clarify certain policies and reflect current procedures and technological advancements. The amendments also allow for the implementation, as applicable to tableting and encapsulating machines, controlled substances, and listed chemicals, of the President's Executive Order 13659 on streamlining the export/import process and requiring the government-wide utilization of the International Trade Data System (ITDS). This rule additionally contains amendments that implement recent changes to the Controlled Substances Import and Export Act (CSIEA) for reexportation of controlled substances among members of the European Economic Area made by the Improving Regulatory Transparency for New Medical Therapies Act. The rule also includes additional substantive and technical and stylistic amendments.
ERIC Educational Resources Information Center
Sage, James E.; And Others
Local and state government agencies and private companies providing hazardous material emergency response services are attempting to meet the minimum training requirements for their employees as specified in federal law. However, none of the employers in a pilot survey met the requirements of the federal law for employer certification of employee…
Report of the DOD-University Forum Working Group on Engineering and Science Education.
1983-07-01
high priority to strengthening our national base of scientific and technical personnel. That included im- mediate emphasis on training people in the...4 - DOD Requirements for Civilian Engineering and Scientific Personnel .. 5 - DOD Requirements for Military Engineering and Scientific ...15 - The Problem is Quality ................ o................. ...... 15 - The Quality of Engineering and Scientific Personnel in
7 CFR Appendix C to Subpart B of... - Technical Report for Hydropower Projects
Code of Federal Regulations, 2013 CFR
2013-01-01
...,000 require the services of a licensed professional engineer (PE) or team of PEs. Depending on the... services of a licensed PE or a team of licensed PEs may be required for smaller projects. (a) Qualifications of project team. The hydropower project team should consist of a system designer, a project...
7 CFR Appendix C to Subpart B of... - Technical Report for Hydropower Projects
Code of Federal Regulations, 2014 CFR
2014-01-01
...,000 require the services of a licensed professional engineer (PE) or team of PEs. Depending on the... services of a licensed PE or a team of licensed PEs may be required for smaller projects. (a) Qualifications of project team. The hydropower project team should consist of a system designer, a project...
7 CFR Appendix C to Subpart B of... - Technical Report for Hydropower Projects
Code of Federal Regulations, 2012 CFR
2012-01-01
...,000 require the services of a licensed professional engineer (PE) or team of PEs. Depending on the... services of a licensed PE or a team of licensed PEs may be required for smaller projects. (a) Qualifications of project team. The hydropower project team should consist of a system designer, a project...
2nd Generation RLV Risk Definition Program
NASA Technical Reports Server (NTRS)
Davis, Robert M.; Stucker, Mark (Technical Monitor)
2000-01-01
The 2nd Generation RLV Risk Reduction Mid-Term Report summarizes the status of Kelly Space & Technology's activities during the first two and one half months of the program. This report was presented to the cognoscente Contracting Officer's Technical Representative (COTR) and selected Marshall Space Flight Center staff members on 26 September 2000. The report has been approved and is distributed on CD-ROM (as a PowerPoint file) in accordance with the terms of the subject contract, and contains information and data addressing the following: (1) Launch services demand and requirements; (2) Architecture, alternatives, and requirements; (3) Costs, pricing, and business cases analysis; (4) Commercial financing requirements, plans, and strategy; (5) System engineering processes and derived requirements; and (6) RLV system trade studies and design analysis.
Ho, Bella; Ho, Eric
2012-01-01
Introduction: ISO 15189 was a new standard published in 2003 for accrediting medical laboratories. We believe that some requirements of the ISO 15189 standard are especially difficult to meet for majority of laboratories. The aim of this article was to present the frequency of nonconformities to requirements of the ISO 15189 accreditation standard, encountered during the assessments of medical laboratories in Hong Kong, during 2004 to 2009. Materials and methods: Nonconformities reported in assessments based on ISO 15189 were analyzed in two periods – from 2004 to 2006 and in 2009. They are categorized according to the ISO 15189 clause numbers. The performance of 27 laboratories initially assessed between 2004 and 2006 was compared to their performance in the second reassessment in 2009. Results: For management requirements, nonconformities were most frequently reported against quality management system, quality and technical records and document control; whereas for technical requirements, they were reported against examination procedures, equipment, and assuring quality of examination procedures. There was no major difference in types of common nonconformities reported in the two study periods. The total number of nonconformities reported in the second reassessment of 27 laboratories in 2009 was almost halved compared to their initial assessments. The number of significant nonconformities per laboratory significantly decreased (P = 0.023). Conclusion: Similar nonconformities were reported in the two study periods though the frequency encountered decreased. The significant decrease in number of significant nonconformities encountered in the same group of laboratories in the two periods substantiated that ISO15189 contributed to quality improvement of accredited laboratories. PMID:22838190
Ho, Bella; Ho, Eric
2012-01-01
ISO 15189 was a new standard published in 2003 for accrediting medical laboratories. We believe that some requirements of the ISO 15189 standard are especially difficult to meet for majority of laboratories. The aim of this article was to present the frequency of nonconformities to requirements of the ISO 15189 accreditation standard, encountered during the assessments of medical laboratories in Hong Kong, during 2004 to 2009. Nonconformities reported in assessments based on ISO 15189 were analyzed in two periods - from 2004 to 2006 and in 2009. They are categorized according to the ISO 15189 clause numbers. The performance of 27 laboratories initially assessed between 2004 and 2006 was compared to their performance in the second reassessment in 2009. For management requirements, nonconformities were most frequently reported against quality management system, quality and technical records and document control; whereas for technical requirements, they were reported against examination procedures, equipment, and assuring quality of examination procedures. There was no major difference in types of common nonconformities reported in the two study periods. The total number of nonconformities reported in the second reassessment of 27 laboratories in 2009 was almost halved compared to their initial assessments. The number of significant nonconformities per laboratory significantly decreased (P = 0.023). Similar nonconformities were reported in the two study periods though the frequency encountered decreased. The significant decrease in number of significant nonconformities encountered in the same group of laboratories in the two periods substantiated that 15015189 contributed to quality improvement of accredited laboratories.
So You Want to Link Your State Data
DOT National Transportation Integrated Search
1996-07-01
This technical report discusses the advantages of linking state accident and : medical data to enhance decision making on highway safety and injury control : activities. Such data linkage for decision making support requires a systematic : approach t...
Gas Turbine Engine Production Implementation Study : Volume 2. Technical Discussion.
DOT National Transportation Integrated Search
1973-07-01
This report presents a summarization and assessment of available information pertaining to the potential for implementing mass production of gas turbine engine-powered automobiles. The main topic covered is the schedule requirement for that implement...
Highway Economic Requirements System - v. IV. Technical Report (Version 2)
DOT National Transportation Integrated Search
1999-05-04
This paper present background information for evaluating a possible relationship between the geographic extent of broadband telecommunications infrastructure available for general use, and the level of control exercised by the public right-of-way (RO...
1985-12-01
Department of Health after reviewing the proposed 1700-ft expansion concept, stated that the north boundary system would be required to intercept and treat...upper Denver sand units along the system alignment. 8. During May 1979, technical discussions between RMA and the Colorado Department of Health ...centered on the technical feasibility and benefits of constructing a 1200-ft segment of the proposed 1700-ft expansion immediately to intercept a DBCP plume
Republic of the Marshall Islands. Energy Project Development Options and Technical Assessment (2013)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Conrad, Misty Dawn; Olis, Dan; Ness, J. Erik
2015-09-01
The advancement of renewable energy and energy efficient technologies continues to be fluid. There are many technical opportunities and strategies that can be utilized to guide communities to deploy cost-effective commercial alternative energy options; however, to achieve aggressive economic, environmental, and security goals, it requires a comprehensive, integrated approach. This document reports on the initial findings of an energy assessment that was conducted for the Republic of the Marshall Islands.
Aliakbari, Fatemeh; Bahrami, Masoud; Aein, Fereshteh; Khankeh, Hamidreza
2014-11-01
Today disasters are a part of many people's lives. Iran has a long history of disaster events and nurses are one of the most significant groups within the Iranian disaster relief operations, providing immediate and long-term care for those affected by the disaster. However, the technical competence of Iranian nurses and their training for this work has received little attention. This article presents the results of a study that aims to explore this context. A qualitative study was conducted using in-depth interviews to collect data from 30 nurses, who were deliberately selected from the health centers affiliated to the Isfahan University of Medical Sciences. Themes were identified using the conventional qualitative content analysis. The trustworthiness of the study was supported by considering the auditability, neutrality, consistency, and transferability. The study lasted from 2011 to 2012. Data analysis undertaken for the qualitative study resulted in the identification of five main themes, which included: (1) Management competences, (2) ethical and legal competences, (3) team working, and (4) personal abilities and the specific technical competences presented in this report. This report presents an overview of the nursing technical capabilities required for Iranian nurses during disaster relief. It is argued that additional competencies are required for nurses who care in high-risk situations, including disasters. Nurses need to prepare themselves more effectively to be responsible and effective in nursing care.
NASA Technical Reports Server (NTRS)
Elliott, D. W.
1976-01-01
The conversion of two T-39 aircraft into lift cruise fan research and technology vehicles is discussed. The concept is based upon modifying the T-39A (NA265-40) Sabreliner airframe into a V/STOL configuration by incorporating two LCF-459 lift cruise fans and three YJ-97 gas generators. The propulsion concept provides the thrust for horizontal flight or lift for vertical flight by deflection of bifurcated nozzles while maintaining engine out safety throughout the flight envelope. The configuration meets all the study requirements specified for the design with control powers in VTOL and conversion in excess of the requirement making it an excellent vehicle for research and development. The study report consists of two volumes; Volume 1 (Reference a) contains background data detailed description and technical substantiation of the aircraft. Volume 2 includes cost data, scheduling and program planning not addressed in Volume 1.
SafeConnect Solar - Final Scientific/Technical Report (Updated)
DOE Office of Scientific and Technical Information (OSTI.GOV)
McNish, Zachary
2016-02-03
Final Scientific/Technical Report from Tier 0 SunShot Incubator award for hardware-based solution to reducing soft costs of installed solar. The primary objective of this project was for SafeConnect Solar (“SafeConnect”) to create working proof-of-concept hardware prototypes from its proprietary intellectual property and business concepts for a plug-and-play, safety-oriented hardware solution for photovoltaic solar systems. Specifically, SafeConnect sought to build prototypes of its “SmartBox” and related cabling and connectors, as well as the firmware needed to run the hardware. This hardware is designed to ensure a residential PV system installed with it can address all safety concerns that currently form themore » basis of AHJ electrical permitting and licensing requirements, thereby reducing the amount of permitting and specialized labor required on a residential PV system, and also opening up new sales channels and customer acquisition opportunities.« less
Estimating Renewable Energy Economic Potential in the United States: Methodology and Initial Results
DOE Office of Scientific and Technical Information (OSTI.GOV)
Brown, Austin; Beiter, Philipp; Heimiller, Donna
The report describes a geospatial analysis method to estimate the economic potential of several renewable resources available for electricity generation in the United States. Economic potential, one measure of renewable generation potential, is defined in this report as the subset of the available resource technical potential where the cost required to generate the electricity (which determines the minimum revenue requirements for development of the resource) is below the revenue available in terms of displaced energy and displaced capacity.
DOE Office of Scientific and Technical Information (OSTI.GOV)
De Volpi, A.; Fenrick, M. R.; Stanford, G. S.
1980-10-01
Documentation often is a primary residual of research and development. Because of this important role and because of the large amount of time consumed in generating technical reports, particularly those containing formulas and graphics, an existing data-processing computer system has been adapted so as to provide text-processing of technical documents. Emphasis has been on accuracy, turnaround time, and time savings for staff and secretaries, for the types of reports normally produced in the reactor development program. The computer-assisted text-processing system, called TXT, has been implemented to benefit primarily the originator of technical reports. The system is of particular value tomore » professional staff, such as scientists and engineers, who have responsibility for generating much correspondence or lengthy, complex reports or manuscripts - especially if prompt turnaround and high accuracy are required. It can produce text that contains special Greek or mathematical symbols. Written in FORTRAN and MACRO, the program TXT operates on a PDP-11 minicomputer under the RSX-11M multitask multiuser monitor. Peripheral hardware includes videoterminals, electrostatic printers, and magnetic disks. Either data- or word-processing tasks may be performed at the terminals. The repertoire of operations has been restricted so as to minimize user training and memory burden. Spectarial staff may be readily trained to make corrections from annotated copy. Some examples of camera-ready copy are provided.« less
Advanced High Temperature Polymer Matrix Composites for Gas Turbine Engines Program Expansion
NASA Technical Reports Server (NTRS)
Hanley, David; Carella, John
1999-01-01
This document, submitted by AlliedSignal Engines (AE), a division of AlliedSignal Aerospace Company, presents the program final report for the Advanced High Temperature Polymer Matrix Composites for Gas Turbine Engines Program Expansion in compliance with data requirements in the statement of work, Contract No. NAS3-97003. This document includes: 1 -Technical Summary: a) Component Design, b) Manufacturing Process Selection, c) Vendor Selection, and d) Testing Validation: 2-Program Conclusion and Perspective. Also, see the Appendix at the back of this report. This report covers the program accomplishments from December 1, 1996, to August 24, 1998. The Advanced High Temperature PMC's for Gas Turbine Engines Program Expansion was a one year long, five task technical effort aimed at designing, fabricating and testing a turbine engine component using NASA's high temperature resin system AMB-21. The fiber material chosen was graphite T650-35, 3K, 8HS with UC-309 sizing. The first four tasks included component design and manufacturing, process selection, vendor selection, component fabrication and validation testing. The final task involved monthly financial and technical reports.
Kinetics of Supercritical Water Oxidation
1995-12-31
milestone and Sandia Technical Report. A much-needed report describing in detail the operation of the Supercritical Fluids Reactor (SFR) was also...years. In addition, the literature research required to arrive at this optimal design will be used to improve the performance of the Supercritical Fluids ...the Supercritical Fluids Reactor (SFR)" (Sandia National Laboratories Report SAND-8203, Livermore, CA, 1995). R. R. Steeper, "Methane and Methanol
Curtis H. Flather; Stephen J. Brady; Michael S. Knowles
1999-01-01
This report documents trends in wildlife resources for the nation as required by the Renewable Resources Planning Act (RPA) of 1974. The report focuses on recent historical trends in wildlife as one indicator of ecosystem health across the United States and updates wildlife trends presented in previous RPA Assessments. The report also shows short- and long-term...
ERIC Educational Resources Information Center
Vernon, Ralph J.; And Others
This report summarizes research findings which resulted in development of curricula for occupational safety and health professions based on task/activity analyses and related performance objectives. The first seven chapters focus on the seven objectives. Chapter 1, Literature Review and Selection of Employers, concerns tasks required for…
ERIC Educational Resources Information Center
Massuda, Rachel
These four reports provide details of projects to design and implement courses to be offered as requirements for the associate degree program in composites and reinforced plastics technology. The reports describe project activities that led to development of curricula for four courses: composite materials, composite materials fabrication I,…
Practical of Ethics Education in Junior High School Technical Arts
NASA Astrophysics Data System (ADS)
Iwata, Ryo; Hirano, Shigeo
Now, such as forgery, camouflage, concealment, and the alteration, the problems resulting from lack of the sense of ethics are occurring frequently. The department of junior high school technical arts to engineering ethics education is required for the solution. However, the example of introducing the ethics education is few in a current junior high school technical arts department. It is considered that it leads to a further improvement of the morality consideration by teaching from a past case to the engineering ethics at the stage of the compulsory education. In this thesis, it reports on the execution contents and an educational result.
2012-11-15
This final rule with comment period revises the Medicare hospital outpatient prospective payment system (OPPS) and the Medicare ambulatory surgical center (ASC) payment system for CY 2013 to implement applicable statutory requirements and changes arising from our continuing experience with these systems. In this final rule with comment period, we describe the changes to the amounts and factors used to determine the payment rates for Medicare services paid under the OPPS and those paid under the ASC payment system. In addition, this final rule with comment period updates and refines the requirements for the Hospital Outpatient Quality Reporting (OQR) Program, the ASC Quality Reporting (ASCQR) Program, and the Inpatient Rehabilitation Facility (IRF) Quality Reporting Program. We are continuing the electronic reporting pilot for the Electronic Health Record (EHR) Incentive Program, and revising the various regulations governing Quality Improvement Organizations (QIOs), including the secure transmittal of electronic medical information, beneficiary complaint resolution and notification processes, and technical changes. The technical changes to the QIO regulations reflect CMS' commitment to the general principles of the President's Executive Order on Regulatory Reform, Executive Order 13563 (January 18, 2011).
Industrial Fuel Gas Demonstration Plant Program. Bid packages for materials (Deliverable No. 28)
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
1979-01-01
Fixed-price supply type bid packages for materials and/or service essentially are comprised of two parts, namely: (1) a technical requisition of the material, equipment, or service to be supplied; and (2) commercial and legal requirements, normally referred to as terms and conditions. Requisitions, providing technical requirements, for all equipment items identified for the Industrial Fuel Gas Demonstration Plant may be found in the 12 volumes of the Demonstration Plant Mechanical Design. The requisitions have been included within separate sections of the design report, sorted by appropriate plant unit. Combined with any General Notes Requisition and the necessary FWEC Job Standards,more » these various item requisitions provide all technical information for the prospective vendor to furnish his bid. The terms and conditions (boiler plate) to be included in the bid package identify all the contractual requirements which will be imposed upon the bidder. These requirements cover the conditions he must meet to bid on the particular item as well as the clauses to be included within the eventual purchase order/subcontract. A typical package of such terms and conditions is included.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-21
...The EPA is proposing to amend specific provisions of the Greenhouse Gas Reporting Rule to provide greater clarity and flexibility to facilities subject to reporting emissions from certain source categories. These source categories will report greenhouse gas (GHG) data for the first time in September of 2012. The proposed changes are not expected to significantly change the overall calculation and monitoring requirements of the Greenhouse Gas Reporting Rule or add additional requirements for reporters, but are expected to correct errors and clarify existing requirements in order to facilitate accurate and timely reporting. The EPA is also proposing confidentiality determinations for four new data elements for the fluorinated gas production source category of the Greenhouse Gas Reporting Rule. Lastly, we are proposing an amendment to Table A-7 of the general provisions to add a data element used as an input to an emission equation in the fluorinated gas production source category.
DOT National Transportation Integrated Search
2010-10-01
While a formal planning and programming process is established for urbanized areas through Metropolitan : Planning Organizations, no similar requirement has been established for rural areas. Currently, under the : Safe, Accountable, Flexible, Efficie...
Railroad track inspection interface demonstration : final report.
DOT National Transportation Integrated Search
2016-01-01
This project developed a track data user interface utilizing the Google Glass optical display device. The interface allows the user : to recall data stored remotely and view the data on the Google Glass. The technical effort required developing a com...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-29
... of Fish and Game, and the International Pacific Halibut Commission will present a technical workshop... Language (XML) interface is designed to facilitate an exchange of landings and production data between e...
Rapid field detection of moisture content for base and subgrade : technical report.
DOT National Transportation Integrated Search
2015-03-01
Mixing and compacting soil and flexible base pavement materials at the proper moisture content is critical : for obtaining adequate compaction and meeting construction specification requirements. This project sought : to evaluate rapid non-nuclear te...
The Basic Organizing/Optimizing Training Scheduler (BOOTS): User's Guide. Technical Report 151.
ERIC Educational Resources Information Center
Church, Richard L.; Keeler, F. Laurence
This report provides the step-by-step instructions required for using the Navy's Basic Organizing/Optimizing Training Scheduler (BOOTS) system. BOOTS is a computerized tool designed to aid in the creation of master training schedules for each Navy recruit training command. The system is defined in terms of three major functions: (1) data file…
ERIC Educational Resources Information Center
Goclowski, John C.; And Others
This supplement to a technical report providing the results of a preliminary investigation of the potential impact of the Digital Avionics Information System (DAIS) concept on system support personnel requirements and life cycle cost (LCC) includes: (1) additional details of the cost comparison of a hypothetical application of a conceptual…
Cape Blanco Wind Farm Feasibility Study : Technical Report, No. 2, Civil Engineering.
DOE Office of Scientific and Technical Information (OSTI.GOV)
United States. Bonneville Power Administration.
1986-09-01
An investigation of the feasibility of developing a wind farm near Cape Blanco, Oregon, requires a plan for civil engineering and preliminary site construction activities. In this report, plans for such activities and related cost estimates are presented for a wind farm using either a Boeing MOD-2 or FloWind 170 wind turbine generator.
Feasibility Study on Fully Automatic High Quality Translation: Volume I. Final Technical Report.
ERIC Educational Resources Information Center
Lehmann, Winifred P.; Stachowitz, Rolf
The object of this theoretical inquiry is to examine the controversial issue of a fully automatic high quality translation (FAHQT) in the light of past and projected advances in linguistic theory and hardware/software capability. This first volume of a two-volume report discusses the requirements of translation and aspects of human and machine…
Instrumentation and control of harmonic oscillators via a single-board microprocessor-FPGA device.
Picone, Rico A R; Davis, Solomon; Devine, Cameron; Garbini, Joseph L; Sidles, John A
2017-04-01
We report the development of an instrumentation and control system instantiated on a microprocessor-field programmable gate array (FPGA) device for a harmonic oscillator comprising a portion of a magnetic resonance force microscope. The specific advantages of the system are that it minimizes computation, increases maintainability, and reduces the technical barrier required to enter the experimental field of magnetic resonance force microscopy. Heterodyne digital control and measurement yields computational advantages. A single microprocessor-FPGA device improves system maintainability by using a single programming language. The system presented requires significantly less technical expertise to instantiate than the instrumentation of previous systems, yet integrity of performance is retained and demonstrated with experimental data.
Instrumentation and control of harmonic oscillators via a single-board microprocessor-FPGA device
NASA Astrophysics Data System (ADS)
Picone, Rico A. R.; Davis, Solomon; Devine, Cameron; Garbini, Joseph L.; Sidles, John A.
2017-04-01
We report the development of an instrumentation and control system instantiated on a microprocessor-field programmable gate array (FPGA) device for a harmonic oscillator comprising a portion of a magnetic resonance force microscope. The specific advantages of the system are that it minimizes computation, increases maintainability, and reduces the technical barrier required to enter the experimental field of magnetic resonance force microscopy. Heterodyne digital control and measurement yields computational advantages. A single microprocessor-FPGA device improves system maintainability by using a single programming language. The system presented requires significantly less technical expertise to instantiate than the instrumentation of previous systems, yet integrity of performance is retained and demonstrated with experimental data.
IDA and the Technical Cooperation Program Real-Time Systems and Ada Workshop, 21-23 June 1988
1988-06-01
IDA Memorandum Report M-540, IDA and the Technical Cooperation Program Real - Time Systems and Ada Workshop, 21-23 June 1988, documents the results of... time systems , (2) identify and clarify known Ada real-time issues, (3) identify near-term and long-term solutions, and (4) provide assessment and...Technology (ODUSD R&AT). Funding was provided by the STARS Joint Program Office. The objectives were to (1) define requirements for using Ada in real
1991-05-01
or may not bypass the editing function. At present, editing rules beyond those required for translation have not been stipulated. 2When explicit... editing rules become defined, the editor at a site LGN may perform two levels of edit checking: warning, which would insert blanks or pass as submitted...position image transactions into a transaction set. This low-level edit checking is performed at the site LGN to reduce transmission costs and to
DOE Office of Scientific and Technical Information (OSTI.GOV)
Spachner, S.A.
1962-10-31
A container-sleeve-liner assembly was designed which will provide adequate support for ceramic, ceramic coated metal, or metal liners. The design minimizes mechanical property requirements of liner materials, and permits rapid removal of worn or damaged liners. A high-strength stem was designed and fabricated. Technical literature on high-strength materials was reviewed, and high-strength materials producers were contacted to locate sources and assess applicability of existing materials for refractory metal extrusion liner use. (auth)
Notional Scoring for Technical Review Weighting As Applied to Simulation Credibility Assessment
NASA Technical Reports Server (NTRS)
Hale, Joseph Peter; Hartway, Bobby; Thomas, Danny
2008-01-01
NASA's Modeling and Simulation Standard requires a credibility assessment for critical engineering data produced by models and simulations. Credibility assessment is thus a "qualifyingfactor" in reporting results from simulation-based analysis. The degree to which assessors should be independent of the simulation developers, users and decision makers is a recurring question. This paper provides alternative "weighting algorithms" for calculating the value-added for independence of the levels of technical review defined for the NASA Modeling and Simulation Standard.
NASA Technical Reports Server (NTRS)
Digman, R. Michael
1988-01-01
The components necessary for the success of the commercialization of an Ada Technology Transition Network are reported in detail. The organizational plan presents the planned structure for services development and technical transition of AdaNET services to potential user communities. The Business Plan is the operational plan for the AdaNET service as a commercial venture. The Technical Plan is the plan from which the AdaNET can be designed including detailed requirements analysis. Also contained is an analysis of user fees and charges, and a proposed user fee schedule.
Shuttle payload interface verification equipment study. Volume 2: Technical document, part 1
NASA Technical Reports Server (NTRS)
1976-01-01
The technical analysis is reported that was performed during the shuttle payload interface verification equipment study. It describes: (1) the background and intent of the study; (2) study approach and philosophy covering all facets of shuttle payload/cargo integration; (3)shuttle payload integration requirements; (4) preliminary design of the horizontal IVE; (5) vertical IVE concept; and (6) IVE program development plans, schedule and cost. Also included is a payload integration analysis task to identify potential uses in addition to payload interface verification.
Study of Membrane Reflector Technology
NASA Technical Reports Server (NTRS)
Knapp, K.; Hedgepeth, J.
1979-01-01
Very large reflective surfaces are required by future spacecraft for such purposes as solar energy collection, antenna surfaces, thermal control, attitude and orbit control with solar pressure, and solar sailing. The performance benefits in large membrane reflector systems, which may be derived from an advancement of this film and related structures technology, are identified and qualified. The results of the study are reported and summarized. Detailed technical discussions of various aspects of the study are included in several separate technical notes which are referenced.
ERIC Educational Resources Information Center
Hartley, Roger; Kinshuk; Koper, Rob; Okamoto, Toshio; Spector, J. Michael
2010-01-01
The educational and training requirements of Advanced Learning Technology (ALT) need to engage with curricula that reflect the varied requirements of the workplace and of society. Students have a range of interests and ambitions in ALT which the instructional process has to accommodate and support. With these considerations in mind the IEEE…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Channell, J.K.; Walker, B.A.
2000-05-01
Specifically this report: 1. Compares requirements of the WAP that are pertinent from a technical viewpoint with the WIPP pre-Permit waste characterization program, 2. Presents the results of a risk analysis of the currently emplaced wastes. Expected and bounding risks from routine operations and possible accidents are evaluated; and 3. Provides conclusions and recommendations.
NASA Technical Reports Server (NTRS)
Hatterick, G. R.
1972-01-01
The data sheets presented contain the results of the task analysis portion of the study to identify skill requirements of space shuttle crew personnel. A comprehensive data base is provided of crew functions, operating environments, task dependencies, and task-skills applicable to a representative cross section of earth orbital research experiments.
Egomotion Estimation with Optic Flow and Air Velocity Sensors
2012-01-22
RUMMELT ADAM J. RUTKOWSKI Acting Technical Advisor, RWW Program Manager This report is...method of distance and groundspeed estimation using an omnidirectional camera, but knowledge of the average scene distance is required. Flight height...varying wind and even over sloped terrain. Our method also does not require any prior knowledge of the environment or the flyer motion states. This
ERIC Educational Resources Information Center
Zirkle, Christopher J.; Jeffery, Jeremy O.
2017-01-01
The current climate of career and technical administration requirements in all 50 states was detailed and explored. An increasing number of states are not requiring specific career-technical administration certification/licensure in order to oversee secondary career and technical education (CTE) programs, with more states moving towards a general…
Initial Calibration of the AEDC Impulse Tunnel
1996-08-01
material characteristics required are a high yield strength, a low coefficient of expansion, and a high hardness. The calculations in this section were...Qualified users may obtain copies of this report from the Defense Technical Information Center. References to named commercial products in this...report are not to be considered in any sense as an endorsement of the product by the United States Air Force or the Government. This report has been
78 FR 48035 - Conservation Reserve Program, Re-Enrollment
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-07
... purpose of CRP is to cost- effectively assist producers in conserving and improving soil, water, wildlife... producers in conserving and improving soil, water, wildlife, and other natural resources by converting..., Reporting and recordkeeping requirements, Soil conservation, Technical assistance, Water resources, Wildlife...
76 FR 49669 - Change of Address for Region 1; Technical Correction
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-11
... organic compounds. 40 CFR Part 59 Environmental protection, Air pollution control, Confidential business information, Labeling, Ozone, Reporting and recordkeeping requirements, Volatile organic compounds. 40 CFR..., Copper, Dry cleaners, Electric power plants, Fertilizers, Fluoride, Gasoline, Glass and glass products...
Aluminum Rich Epoxy Primer for Ground and Air Vehicles
2017-03-01
UNCLASSIFIED DOCUMENT Aluminum Rich Epoxy Primer for Ground and Air Vehicles Monthly Technical Report for the Period: January 20, 2017...Objective: To further develop the Aluminum Rich Epoxy Primer systems for Air and Ground Vehicles while addressing the objective requirements
Variable Dynamic Testbed Vehicle Study, Final Report, Volume II: Technical Results
DOT National Transportation Integrated Search
1994-08-30
THE NATIONAL HIGHWAY TRAFFIC SAFETY ADMINISTRATION (NHTSA) COMMISSIONED THE JET PROPULSION LABORATORY (JPL) TO CONDUCT A STUDY OF AN INSTRUMENTED TEST VEHICLE THAT MAY SATISFY A NUMBER OF REQUIREMENTS FOR NHTSA AS WELL AS OTHERS DOING WORK ASSOCIATED...
Enforcement Requirements For High-Occupancy Vehicle Facilities, Final Report
DOT National Transportation Integrated Search
1995-02-01
This handbook is designed for technical staff as an instructional guide to the 1990 Census Transportation Planning Package (CTPP) and its potential uses. the CTPP contains 1990 social and economic data by place of residence, place of work, and journe...
76 FR 59304 - Technical Amendment; Updates to Titles of Officials, Office Names, and References
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-26
..., Reporting and recordkeeping requirements, Statistics. Dated: September 20, 2011. Samuel D. Rauch III, Deputy....121 Introductory text 2 300.128 3 300.140 1 300.141 Introductory text 2 300.144 1 300.151 Introductory...
VOLUMETRIC TANK TESTING: AN OVERVIEW
This report summarizes the technical findings of an EPA study on volumetric tank testing. The results of this study, which evaluated the viability of volumetric tank tests as a means of detecting leaks in underground storage tanks, are described. Also, the accuracy requirements s...
Small image laser range finder for planetary rover
NASA Technical Reports Server (NTRS)
Wakabayashi, Yasufumi; Honda, Masahisa; Adachi, Tadashi; Iijima, Takahiko
1994-01-01
A variety of technical subjects need to be solved before planetary rover navigation could be a part of future missions. The sensors which will perceive terrain environment around the rover will require critical development efforts. The image laser range finder (ILRF) discussed here is one of the candidate sensors because of its advantage in providing range data required for its navigation. The authors developed a new compact-sized ILRF which is a quarter of the size of conventional ones. Instead of the current two directional scanning system which is comprised of nodding and polygon mirrors, the new ILRF is equipped with the new concept of a direct polygon mirror driving system, which successfully made its size compact to accommodate the design requirements. The paper reports on the design concept and preliminary technical specifications established in the current development phase.
NASA Technical Reports Server (NTRS)
Mccullough, R. A.; Pinelli, T. E.; Pilley, D. D.; Stohrer, F. F.
1982-01-01
Current practice and usage using selected technical reports; literature relative to the sequential, language, and presentation components of technical reports; and NASA technical report publications standards are discussed. The effctiveness of the technical report as a product for information dissemination is considered.
Yamamoto, Katsumi; Michida, Tomoki; Nishida, Tsutomu; Hayashi, Shiro; Naito, Masafumi; Ito, Toshifumi
2015-01-01
Endoscopic submucosal dissection (ESD) is very useful in en bloc resection of large superficial colorectal tumors but is a technically difficult procedure because the colonic wall is thin and endoscopic maneuverability is poor because of colonic flexure and extensibility. A high risk of perforation has been reported in colorectal ESD. To prevent complications such as perforation and unexpected bleeding, it is crucial to ensure good visualization of the submucosal layer by creating a mucosal flap, which is an exfoliated mucosa for inserting the tip of the endoscope under it. The creation of a mucosal flap is often technically difficult; however, various types of equipment, appropriate strategy, and novel procedures including our clip-flap method, appear to facilitate mucosal flap creation, improving the safety and success rate of ESD. Favorable treatment outcomes with colorectal ESD have already been reported in many advanced institutions, and appropriate understanding of techniques and development of training systems are required for world-wide standardization of colorectal ESD. Here, we describe recent technical advances for safe and successful colorectal ESD. PMID:26468335
ERIC Educational Resources Information Center
Powell, William R.; And Others
This report recommends that an annual report be made to the citizens of Florida about the state of literacy in Florida. The concept of literacy is defined in terms of levels of literacy and basic skills required to achieve the different levels. A review of the literature on literacy is the basis for three suggested levels of literacy: (1)…
Henry Taube and Coordination Chemistry
Shifts Caused by Cr++ in Aqueous Solutions, DOE Technical Report, 1962 Reactions of Solvated Ions Final Report, DOE Technical Report, 1962 Isotopic Discrimination of Some Solutes in Liquid Ammonia, DOE Technical Report, 1966 Final Technical Report of Research, DOE Technical Report, 1972 Top Additional Web
ERIC Educational Resources Information Center
Haverland, Edgar M.
The report describes a project designed to facilitate the transfer and utilization of training technology by developing a model for evaluating training approaches or innovtions in relation to the requirements, resources, and constraints of specific training settings. The model consists of two parallel sets of open-ended questions--one set…
ERIC Educational Resources Information Center
Skrtic, Thomas M.; And Others
The report discusses a field study of the implementation of major requirements of P.L. 94-142, the Education For All Handicapped Children Act, by rural districts, and presents detailed case studies of five districts' responses. The first volume introduces the naturalistic model of inquiry, noting its philosophical underpinnings and basic…
ERIC Educational Resources Information Center
Alonzo, Julie; Tindal, Gerald
2004-01-01
The No Child Left Behind Act of 2001 has increased the importance of assessment in K-12 education. Designed to ensure that all students meet high academic standards, the law currently requires states receiving Title I funds to test all children annually in reading and math in grades 3 through 8 and report student performance disaggregated by…
Space station attached payload program support
NASA Technical Reports Server (NTRS)
Estes, Maurice G., Jr.; Brown, Bardle D.
1989-01-01
The USRA is providing management and technical support for the peer review of the Space Station Freedom Attached Payload proposals. USRA is arranging for consultants to evaluate proposals, arranging meeting facilities for the reviewers to meet in Huntsville, Alabama and management of the actual review meetings. Assistance in developing an Experiment Requirements Data Base and Engineering/Technical Assessment support for the MSFC Technical Evaluation Team is also being provided. The results of the project will be coordinated into a consistent set of reviews and reports by USRA. The strengths and weaknesses analysis provided by the peer panel reviewers will by used NASA personnel in the selection of experiments for implementation on the Space Station Freedom.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1994-05-01
West Virginia University (WVU) and the US DOE Morgantown Energy Technology Center (METC) entered into a Cooperative Agreement on August 29, 1992 entitled ``Decontamination Systems Information and Research Programs.`` Stipulated within the Agreement is the requirement that WVU submit to METC a series of Technical Progress Reports on a quarterly basis. This report comprises the first Quarterly Technical Progress Report for Year 2 of the Agreement. This report reflects the progress and/or efforts performed on the sixteen (16) technical projects encompassed by the Year 2 Agreement for the period of January 1 through March 31, 1994. In situ bioremediation ofmore » chlorinated organic solvents; Microbial enrichment for enhancing in-situ biodegradation of hazardous organic wastes; Treatment of volatile organic compounds (VOCs) using biofilters; Drain-enhanced soil flushing (DESF) for organic contaminants removal; Chemical destruction of chlorinated organic compounds; Remediation of hazardous sites with steam reforming; Soil decontamination with a packed flotation column; Use of granular activated carbon columns for the simultaneous removal of organics, heavy metals, and radionuclides; Monolayer and multilayer self-assembled polyion films for gas-phase chemical sensors; Compact mercuric iodide detector technology development; Evaluation of IR and mass spectrometric techniques for on-site monitoring of volatile organic compounds; A systematic database of the state of hazardous waste clean-up technologies; Dust control methods for insitu nuclear and hazardous waste handling; Winfield Lock and Dam remediation; and Socio-economic assessment of alternative environmental restoration technologies.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-10
... Information Collection: Comment Request; Technical Processing Requirements for Multifamily Project Mortgage... information: Title of Proposal: Technical Processing Requirements for Multifamily Project Mortgage Insurance... information collection requirement described below will be submitted to the Office of Management and Budget...
LDRD 2014 Annual Report: Laboratory Directed Research and Development Program Activities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hatton, Diane
Each year, Brookhaven National Laboratory (BNL) is required to provide a program description and overview of its Laboratory Directed Research and Development Program (LDRD) to the Department of Energy (DOE) in accordance with DOE Order 413.2B dated April 19, 2006. This report provides a detailed look at the scientific and technical activities for each of the LDRD projects funded by BNL in FY 2014, as required. In FY 2014, the BNL LDRD Program funded 40 projects, 8 of which were new starts, at a total cost of $9.6M.
LDRD 2012 Annual Report: Laboratory Directed Research and Development Program Activities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bookless, William
Each year, Brookhaven National Laboratory (BNL) is required to provide a program description and overview of its Laboratory Directed Research and Development Program (LDRD) to the Department of Energy in accordance with DOE Order 413.2B dated April 19, 2006. This report provides a detailed look at the scientific and technical activities for each of the LDRD projects funded by BNL in FY2012, as required. In FY2012, the BNL LDRD Program funded 52 projects, 14 of which were new starts, at a total cost of $10,061,292.
LDRD 2015 Annual Report: Laboratory Directed Research and Development Program Activities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hatton, D.
Each year, Brookhaven National Laboratory (BNL) is required to provide a program description and overview of its Laboratory Directed Research and Development Program (LDRD) to the Department of Energy (DOE) in accordance with DOE Order 413.2B dated April 19, 2006. This report provides a detailed look at the scientific and technical activities for each of the LDRD projects funded by BNL in FY 2015, as required. In FY 2015, the BNL LDRD Program funded 43 projects, 12 of which were new starts, at a total cost of $9.5M.
Analysis of Louisiana vehicular input data for MOBILE 6 : technical summary report.
DOT National Transportation Integrated Search
2009-01-01
The Clean Air Act Amendments (CAAA) of 1990 require that non-attainment and air quality : maintenance areas regularly conduct regional emissions analyses. In Louisiana, Baton Rouge : and Lake Charles are ozone non-attainment areas while New Orleans i...
16 CFR 1051.5 - Requirements and recommendations for petitions.
Code of Federal Regulations, 2010 CFR
2010-01-01
... injury data; or a research study); and (5) Contain an explicit request to initiate Commission rulemaking... hazardous product; and (3) Supply or reference any known documentation, engineering studies, technical studies, reports of injuries, medical findings, legal analyses, economic analyses and environmental impact...
16 CFR 1051.5 - Requirements and recommendations for petitions.
Code of Federal Regulations, 2011 CFR
2011-01-01
... injury data; or a research study); and (5) Contain an explicit request to initiate Commission rulemaking... hazardous product; and (3) Supply or reference any known documentation, engineering studies, technical studies, reports of injuries, medical findings, legal analyses, economic analyses and environmental impact...
Dowel Bar Retrofit Mix Design and Specification : Technical Report
DOT National Transportation Integrated Search
2012-01-01
Current INDOT specifications for repair materials to be used in dowel bar retrofit (DBR) applications (Sections 507.08 and 901.07 of INDOTs Book of Specifications) are based, in large part, on the requirements of ASTM C 928 and the manufacturer-pr...
Analysis and methods of improvement of safety at high-speed rural intersections [technical summary].
DOT National Transportation Integrated Search
2012-01-01
INTRODUCTION: Since 2006, INDOT has been preparing an annual fivepercent : report that identifies intersections and segments : on Indiana state roads that require attention due to the : excessive number and severity of crashes. Many of the : identifi...
Future space transportation systems systems analysis study, phase 1 technical report
NASA Technical Reports Server (NTRS)
1975-01-01
The requirements of projected space programs (1985-1995) for transportation vehicles more advanced than the space shuttle are discussed. Several future program options are described and their transportation needs are analyzed. Alternative systems approaches to meeting these needs are presented.
McKinney, Kevin C.
2006-01-01
This report presents abstracts of technical studies that are focused on the hydrogeologic framework of the Espa?ola basin, a major subbasin of the Cenozoic Rio Grande rift. The Rio Grande, Rio Chama, Santa Fe River, and their tributaries carry important surface water in the Espa?ola basin. Sediments and interbedded volcanic rocks fill the Espa?ola basin and form extensive aquifer systems for ground water. Surface and ground water provide the principal sources of water for most residents of the basin, including people in the cities of Santa Fe, Espa?ola, and Los Alamos as well as Native Americans in several Pueblos. The abstracts describe results of technical studies that were presented either as poster exhibits or oral presentations at the fifth-annual Espa?ola basin workshop, held March 7-8 of 2006 in Santa Fe, New Mexico. The principal goal of this workshop was to share information about ongoing studies. The Espa?ola basin workshop was hosted by the Espa?ola basin technical advisory group (EBTAG) and sponsored by the U.S. Geological Survey, the New Mexico Bureau of Geology and Mineral Resources, and the Water Research Technical Assistance Office of Los Alamos National Laboratory. Abstracts in this report have been grouped into six information themes: Basic Water Data, Water Quality and Water Chemistry, Water Balance and Stream/Aquifer Interaction, Data Integration and Hydrologic Model Testing, Three-Dimensional Hydrogeological Architecture, and Geologic Framework. Abstracts submitted by U.S. Geological Survey authors in this report have had their technical content peer reviewed before they were included in the report. Technical reviews were not required for abstracts submitted by authors outside the USGS, although most did receive peer reviews within their originating agencies. Taken together, the abstracts in this report provide a view of the current status of hydrogeologic research within the Espa?ola basin.
Miranda H. Mockrin; Richard A. Aiken; Curtis H. Flather
2012-01-01
The Forest and Rangeland Renewable Resources Planning Act (RPA) of 1974 requires periodic assessments of the condition and trends of the Nation's renewable natural resources. In this report, we document recent and historical trends in hunting and wildlife watching to fulfill RPA requirements. Using data from the U.S. Department of the Interior, Fish and Wildlife...
1983-05-01
Specialist 880 Respiratory Specialist 506 Psychiatric Specialist 248 Orthopedic Specialist 379 Orthotic Specialist 35 Physical Therapist 200... Therapist 4 Physical Therapist 2 Hospital Dietician 26 Nuclear Medicine Service Officer 3 Entomologist 7 Physiologist 3 Podiatrist 17 Psychologist 6...requirements, working conditions, physical requirements, skill levels, etc. with the civilian health professional manpower pool. The first phase of this effort
United States Air Force Graduate Student Research Program. 1989 Program Technical Report. Volume 1
1989-12-01
Analysis is required to supplement the experimental observations, which requires the formulation of a realistic model of the physical problem...RECOMMENDATION: a . From our point of view, the research team considere the NASTRAN model correct due to the vibrational frequencies, but we are still...structure of the program was understood, attempts were made to change the model from a thunderstorm simulation
1987-12-01
DOWNGPAONG SC-EDULE distributiJ-_ _ . 1.,1J=.ted 4 PERFORMING ORGANZA ;ON REPORT NuMBERIS) S MONiTORING ORGANIZATION REP(CRT %L%ERS, 6a NAME OF PERFORMING...process. It is the one where assistance of other technical experts may be required. It may also require some restructuring of the program merely to
ERIC Educational Resources Information Center
Shaw, James B.; McCormick, Ernest J.
The study was directed towards the further exploration of the use of attribute ratings as the basis for establishing the job component validity of tests, in particular by using different methods of combining "attribute-based" data with "job analysis" data to form estimates of the aptitude requirements of jobs. The primary focus…
Issues in Requirements Elicitation
1992-09-01
oriented domain analysis ( FODA ) continues that the re- quirements analyst uses the products of domain analysis when implementing a new system [Kang 90, p...Peterson, A. Spencer. Feature-Oriented Domain Analysis ( FODA ) Feasibility Study. Technical Report CMU/SEI-90-TR-21, ADA235785, Software Engineering...3.3 Problems of Volatility 12 4 Current Elicitation Techniques 15 4.1 Information Gathering 16 4.2 Requirements Expression and Analysis 19 4.3
38 CFR 61.52 - Threshold requirements for technical assistance grant applications.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 38 Pensions, Bonuses, and Veterans' Relief 2 2010-07-01 2010-07-01 false Threshold requirements....52 Threshold requirements for technical assistance grant applications. To be eligible for a technical assistance grant, an applicant must meet the following threshold requirements: (a) The application included...
38 CFR 61.52 - Threshold requirements for technical assistance grant applications.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 38 Pensions, Bonuses, and Veterans' Relief 2 2012-07-01 2012-07-01 false Threshold requirements....52 Threshold requirements for technical assistance grant applications. To be eligible for a technical assistance grant, an applicant must meet the following threshold requirements: (a) The application included...
NASA Technical Reports Server (NTRS)
Miller, R. E., Jr.; Southall, J. W.; Kawaguchi, A. S.; Redhed, D. D.
1973-01-01
Reports on the design process, support of the design process, IPAD System design catalog of IPAD technical program elements, IPAD System development and operation, and IPAD benefits and impact are concisely reviewed. The approach used to define the design is described. Major activities performed during the product development cycle are identified. The computer system requirements necessary to support the design process are given as computational requirements of the host system, technical program elements and system features. The IPAD computer system design is presented as concepts, a functional description and an organizational diagram of its major components. The cost and schedules and a three phase plan for IPAD implementation are presented. The benefits and impact of IPAD technology are discussed.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 47 Telecommunication 2 2014-10-01 2014-10-01 false Technical requirements for space stations in the Satellite Digital Audio Radio Service and associated terrestrial repeaters. 25.214 Section 25.214... Technical Standards § 25.214 Technical requirements for space stations in the Satellite Digital Audio Radio...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 47 Telecommunication 2 2012-10-01 2012-10-01 false Technical requirements for space stations in the satellite digital audio radio service and associated terrestrial repeaters. 25.214 Section 25.214... Technical Standards § 25.214 Technical requirements for space stations in the satellite digital audio radio...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 2 2011-10-01 2011-10-01 false Technical requirements for space stations in the satellite digital audio radio service and associated terrestrial repeaters. 25.214 Section 25.214... Technical Standards § 25.214 Technical requirements for space stations in the satellite digital audio radio...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 47 Telecommunication 2 2013-10-01 2013-10-01 false Technical requirements for space stations in the Satellite Digital Audio Radio Service and associated terrestrial repeaters. 25.214 Section 25.214... Technical Standards § 25.214 Technical requirements for space stations in the Satellite Digital Audio Radio...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 2 2010-10-01 2010-10-01 false Technical requirements for space stations in the satellite digital audio radio service and associated terrestrial repeaters. 25.214 Section 25.214... Technical Standards § 25.214 Technical requirements for space stations in the satellite digital audio radio...
Hanford Site environmental report for calendar year 1996
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dirkes, R.L.; Hanf, R.W.
The Hanford Site environmental report is prepared annually to summarize environmental data and information, to describe environmental management performance, to demonstrate the status of compliance with environmental regulations, and to highlight major environmental programs and efforts. The report is written to meet requirements and guidelines of the U.S. Department of Energy (DOE) and to meet the needs of the public. This summary has been written with a minimum of technical terminology.
ERIC Educational Resources Information Center
World Health Organization, Geneva (Switzerland).
This report explains what will be necessary to achieve health for all people in the world by the year 2000 through primary health care. The booklet is organized in six chapters. The first chapter introduces the premise and describes current socioeconomic development and prospects for the future, along with current problems of health personnel…
Army Digital Test Requirements Analytic Report.
1983-07-01
NATION4AL BUREAU Of STANOARCA- 963-A RESEARCH AID DEVELOPMENT TECHNICAL REPORT CECOM800520-1 ARMY DIGITAL TEST I O~ ~REGUIREMENTS ANALYTIC REPORT...16I" I i00000TABLE OF COTIWMI (CmnthnePa 3 6.0 DATA REVIEW 17 6.1 COMPREHENSIVE REVIEW 17 3 6.2 REVIEW CONCLUSIONS 17 7.0 SPECIAL RESEARCH 19 8 .0...Identification - Identification of Information Sources S-- Data Collection - Data Organization - Data Review - Special Research - Technology Analysis - Test
DOE Office of Scientific and Technical Information (OSTI.GOV)
Berg, M.T.; Reed, B.E.; Gabr, M.
1993-07-01
West Virginia University (WVU) and the US DOE Morgantown Energy Technology Center (METC) entered into a Cooperative Agreement on August 29, 1992 entitled ``Decontamination Systems Information and Research Programs.`` Stipulated within the Agreement is the requirement that WVU submit to METC a series of Technical Progress Report for Year 1 of the Agreement. This report reflects the progress and/or efforts performed on the following nine technical projects encompassed by the Year 1 Agreement for the period of April 1 through June 30, 1993: Systematic assessment of the state of hazardous waste clean-up technologies; site remediation technologies -- drain-enhanced soil flushingmore » (DESF) for organic contaminants removal; site remediation technologies -- in situ bioremediation of organic contaminants; excavation systems for hazardous waste sites; chemical destruction of polychlorinated biphenyls; development of organic sensors -- monolayer and multilayer self-assembled films for chemical sensors; Winfield lock and dam remediation; Assessments of Technologies for hazardous waste site remediation -- non-treatment technologies and pilot scale test facility implementation; and remediation of hazardous sites with stream reforming.« less
George A. Olah, Carbocation and Hydrocarbon Chemistry
. Final Technical Report. [HF:BF{sub 2}/H{sub 2}] , DOE Technical Report, 1980 Superacid Catalyzed Coal Conversion Chemistry. 1st and 2nd Quarterly Technical Progress Reports, September 1, 1983-March 30, 1984 , DOE Technical Report, 1984 Superacid Catalyzed Coal Conversion Chemistry. Final Technical Report
2011-12-01
systems engineering technical and technical management processes. Technical Planning, Stakeholders Requirements Development, and Architecture Design were...Stakeholder Requirements Definition, Architecture Design and Technical Planning. A purposive sampling of AFRL rapid development program managers and engineers...emphasize one process over another however Architecture Design , Implementation scored higher among Technical Processes. Decision Analysis, Technical
47 CFR 80.273 - Technical requirements for radar equipment.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 5 2011-10-01 2011-10-01 false Technical requirements for radar equipment. 80... Technical requirements for radar equipment. (a) Radar installations on board ships that are required by the Safety Convention or the U.S. Coast Guard to be equipped with radar must comply with the documents...
47 CFR 80.273 - Technical requirements for radar equipment.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 5 2010-10-01 2010-10-01 false Technical requirements for radar equipment. 80... Technical requirements for radar equipment. (a) Radar installations on board ships that are required by the Safety Convention or the U.S. Coast Guard to be equipped with radar must comply with the documents...
Technical evaluation of a CAD system for orthopaedic shoe-upper design.
Lord, M; Foulston, J; Smith, P J
1991-01-01
Computer aided design is now employed routinely in the volume shoe trade. New styles are developed on a three-dimensional image of the last followed by automated pattern generation and engineering. It is suggested that such systems could be useful in the orthopaedic footwear industry although the different requirements for these bespoke products need careful consideration. A clinical trial has been conducted on the Shoemaster (Clarks Shoes) upper design system both to assess its technical capabilities and to consider its role in improvement of service and cosmetic appearance. This particular system works throughout on a three-dimensional representation of the shoe last, which offers particular advantages for integration with shape capture and reproduction. The report concentrates on the technical evaluation to assess (a) its ability to work with unusual last shapes dictated by medical requirements and (b) its potential for integration into a complete computer system for design of both shoe lasts and shoe uppers. The trial indicates that this particular system is promising in both respects.
An update on technical and methodological aspects for cardiac PET applications.
Presotto, Luca; Busnardo, Elena; Gianolli, Luigi; Bettinardi, Valentino
2016-12-01
Positron emission tomography (PET) is indicated for a large number of cardiac diseases: perfusion and viability studies are commonly used to evaluate coronary artery disease; PET can also be used to assess sarcoidosis and endocarditis, as well as to investigate amyloidosis. Furthermore, a hot topic for research is plaque characterization. Most of these studies are technically very challenging. High count rates and short acquisition times characterize perfusion scans while very small targets have to be imaged in inflammation/infection and plaques examinations. Furthermore, cardiac PET suffers from respiratory and cardiac motion blur. Each type of studies has specific requirements from the technical and methodological point of view, thus PET systems with overall high performances are required. Furthermore, in the era of hybrid PET/computed tomography (CT) and PET/Magnetic Resonance Imaging (MRI) systems, the combination of complementary functional and anatomical information can be used to improve diagnosis and prognosis. Moreover, PET images can be qualitatively and quantitatively improved exploiting information from the other modality, using advanced algorithms. In this review we will report the latest technological and methodological innovations for PET cardiac applications, with particular reference to the state of the art of the hybrid PET/CT and PET/MRI. We will also report the most recent advancements in software, from reconstruction algorithms to image processing and analysis programs.
Implementation of the soil compactor analyzer into test method TEX-113-E : technical report.
DOT National Transportation Integrated Search
2012-04-01
Test method Tex-113-E prepares laboratory aggregate base test specimens with an impact hammer : compactor. These specimens are used for compaction characteristics and design tests. Although the : historical Tex-113-E required a certain amount of comp...
78 FR 23824 - Reports, Forms, and Record Keeping Requirements
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-22
..., Contracting Officer's Technical Representative, Office of Behavioral Safety Research (NTI-132), National... descriptive solicitation. The drivers will be asked a series of seven questions to determine eligibility to... on the Nation's highways. As part of this statutory mandate, NHTSA is authorized to conduct research...
DOT National Transportation Integrated Search
1975-12-01
Frequency domain computer programs developed or acquired by TSC for the analysis of rail vehicle dynamics are described in two volumes. Volume I defines the general analytical capabilities required for computer programs applicable to single rail vehi...
REVIEW OF CONTROL OPTIONS FOR METHYL BROMIDE IN COMMODITY TREATMENT
The report describes recent developments in the control of methyl bromide (MeBr) and discusses technical considerations and requirements for and economic feasibility of recovery. (NOTE: MeBr, fumigant for agricultural commodities, is an ozone depleting chemical. The U.S. EPA has ...
77 FR 23396 - Change of Address for Region 4, State and Local Agencies; Technical Correction
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-19
... Tennessee. Certain EPA air pollution control regulations requiring submittal of notifications, reports and... of Subjects 40 CFR Part 52 Environmental protection, Air pollution control, Carbon monoxide... Environmental protection, Administrative practice and procedure, Air pollution control, Aluminum, Ammonium...
16 CFR 1115.26 - Guidelines and policies.
Code of Federal Regulations, 2014 CFR
2014-01-01
... SUBSTANTIAL PRODUCT HAZARD REPORTS Guidelines and Requirements for Mandatory Recall Notices § 1115.26... minimize the use of highly technical or legal terminology. (3) A recall notice should be targeted and...; (ii) Computer, radio, television, or other electronic transmission or medium; (iii) Video news release...
16 CFR 1115.26 - Guidelines and policies.
Code of Federal Regulations, 2012 CFR
2012-01-01
... SUBSTANTIAL PRODUCT HAZARD REPORTS Guidelines and Requirements for Mandatory Recall Notices § 1115.26... minimize the use of highly technical or legal terminology. (3) A recall notice should be targeted and...; (ii) Computer, radio, television, or other electronic transmission or medium; (iii) Video news release...
7 CFR 3203.9 - Accountability and recordkeeping.
Code of Federal Regulations, 2014 CFR
2014-01-01
... recordkeeping. (a) USDA requires all excess computers or other technical equipment received by an eligible... review the reports for accuracy, as well as fair and equitable distribution of the excess computers or... PROPERTY MANAGEMENT, DEPARTMENT OF AGRICULTURE GUIDELINES FOR THE TRANSFER OF EXCESS COMPUTERS OR OTHER...
7 CFR 3203.9 - Accountability and recordkeeping.
Code of Federal Regulations, 2013 CFR
2013-01-01
... recordkeeping. (a) USDA requires all excess computers or other technical equipment received by an eligible... review the reports for accuracy, as well as fair and equitable distribution of the excess computers or... PROPERTY MANAGEMENT, DEPARTMENT OF AGRICULTURE GUIDELINES FOR THE TRANSFER OF EXCESS COMPUTERS OR OTHER...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
The objectives of the closure assessment were to determine the extent of contaminated soil adjacent to the USTs requiring excavation, to provide documentation of soil and groundwater conditions following excavation, and to document closure activities in accordance with applicable VADEQ regulations. During closure activities, ASI provided technical support to the Base to ensure that the UST removal contractor (E K, Inc.) hereinafter referred to as the Contractor was in compliance with the technical requirements (as specified in the Plans and Specifications for Removal of Abandoned Underground Storage Tanks, Virginia Air National Guard, Richmond International Airport, Sandston, VA., dated July 1991more » and revised April 1992, and Addendum Numbers 1 through 7) of the contract. ASI was also responsible for collecting soil and/or groundwater closure samples from the excavations, and providing off-site fixed based laboratory analysis to verify clean conditions within the excavations.« less
48 CFR 2052.211-71 - Technical progress report.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Technical progress report... Technical progress report. As prescribed at 2011.104-70(b), the contracting officer shall insert the... solicitation. Technical Progress Report (JAN 1993) The contractor shall provide a monthly Technical Progress...
48 CFR 2052.211-71 - Technical progress report.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Technical progress report... Technical progress report. As prescribed at 2011.104-70(b), the contracting officer shall insert the... solicitation. Technical Progress Report (JAN 1993) The contractor shall provide a monthly Technical Progress...
48 CFR 2052.211-71 - Technical progress report.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Technical progress report... Technical progress report. As prescribed at 2011.104-70(b), the contracting officer shall insert the... solicitation. Technical Progress Report (JAN 1993) The contractor shall provide a monthly Technical Progress...
48 CFR 2052.211-71 - Technical progress report.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Technical progress report... Technical progress report. As prescribed at 2011.104-70(b), the contracting officer shall insert the... solicitation. Technical Progress Report (JAN 1993) The contractor shall provide a monthly Technical Progress...
16 CFR 1401.5 - Providing performance and technical data to purchasers by labeling.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 16 Commercial Practices 2 2014-01-01 2014-01-01 false Providing performance and technical data to...: REQUIREMENTS TO PROVIDE THE COMMISSION WITH PERFORMANCE AND TECHNICAL DATA; REQUIREMENTS TO NOTIFY CONSUMERS AT POINT OF PURCHASE OF PERFORMANCE AND TECHNICAL DATA § 1401.5 Providing performance and technical data to...
16 CFR 1401.5 - Providing performance and technical data to purchasers by labeling.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 16 Commercial Practices 2 2012-01-01 2012-01-01 false Providing performance and technical data to...: REQUIREMENTS TO PROVIDE THE COMMISSION WITH PERFORMANCE AND TECHNICAL DATA; REQUIREMENTS TO NOTIFY CONSUMERS AT POINT OF PURCHASE OF PERFORMANCE AND TECHNICAL DATA § 1401.5 Providing performance and technical data to...
16 CFR 1401.5 - Providing performance and technical data to purchasers by labeling.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 16 Commercial Practices 2 2011-01-01 2011-01-01 false Providing performance and technical data to...: REQUIREMENTS TO PROVIDE THE COMMISSION WITH PERFORMANCE AND TECHNICAL DATA; REQUIREMENTS TO NOTIFY CONSUMERS AT POINT OF PURCHASE OF PERFORMANCE AND TECHNICAL DATA § 1401.5 Providing performance and technical data to...
16 CFR 1401.5 - Providing performance and technical data to purchasers by labeling.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Providing performance and technical data to...: REQUIREMENTS TO PROVIDE THE COMMISSION WITH PERFORMANCE AND TECHNICAL DATA; REQUIREMENTS TO NOTIFY CONSUMERS AT POINT OF PURCHASE OF PERFORMANCE AND TECHNICAL DATA § 1401.5 Providing performance and technical data to...
Cho, Jin-Hyung; Park, Wonse; Park, Kyeong-Mee; Kim, Seo-Yul
2017-01-01
Digital dentistry has influenced many dental procedures, such as three-dimensional (3D) diagnosis and treatment planning, surgical splints, and prosthetic treatments. Patient-specific protective appliances (PSPAs) prevent dental injury during endotracheal intubation. However, the required laboratory work takes time, and there is the possibility of tooth extraction while obtaining the dental impression. In this technical report, we utilized new digital technology for creating PSPAs, using direct intraoral scanners and 3D printers for dental cast fabrication. PMID:28879329
Cho, Jin-Hyung; Park, Wonse; Park, Kyeong-Mee; Kim, Seo-Yul; Kim, Kee-Deog
2017-03-01
Digital dentistry has influenced many dental procedures, such as three-dimensional (3D) diagnosis and treatment planning, surgical splints, and prosthetic treatments. Patient-specific protective appliances (PSPAs) prevent dental injury during endotracheal intubation. However, the required laboratory work takes time, and there is the possibility of tooth extraction while obtaining the dental impression. In this technical report, we utilized new digital technology for creating PSPAs, using direct intraoral scanners and 3D printers for dental cast fabrication.
NASA Technical Reports Server (NTRS)
Zhang. W. W.; Biskach, M. P.; Blake, P. N.; Chan, K. W.; Gaskin, J. A.; Hong, M. L.; Jones, W. D.; Kolos, L. D.; Mazzarella, J. R.; McClelland, R. S.;
2012-01-01
X-ray astronomy depends on the availability of telescopes with high resolution and large photon collecting areas. Since x-ray observation can only be carried out above the atmosphere, these telescopes must be necessarily lightweight. Compounding the lightweight requirement is that an x-ray telescope consists of many nested concentric shells, which further require that x-ray mirrors must also be geometrically thin to achieve high packing efficiency. This double lightweight and geometrically thin requirement poses significant technical challenges in fabricating the mirrors and in integrating them into mirror assemblies. This paper reports on the approach, strategy and status of our x-ray optics development program whose objective is to meet these technical challenges at modest cost to enable future x-ray missions, including small Explorer missions in the near term, probe class missions in the medium term, and large flagship missions in the long term.
OIL WELL REMEDIATION IN CLAY AND WAYNE COUNTIES, IL
DOE Office of Scientific and Technical Information (OSTI.GOV)
Peter L. Dakuras; Larry Stieber; Dick Young
2003-02-01
This is the first technical progress report of the remediation of two wells and a water injection well in Clay County, Illinois. The location is identified as the Routt lease and the wells will be identified as the Routt No.3 and Routt No.4 respectively throughout this report. The Clay County portion of this project has met all legal, financial, and environmental requirements to drill and /or pump oil at this lease. We have also obtained all available information about this site and have taken the necessary steps to improve access roads, dig the necessary pits and build the necessary firewalls.more » Both wells have been drilled to the Salem formation. Gas gun technology was used to stimulate the reservoir of the Routt No.3. This report will address the technical aspects of the remediation.« less
Report on the Armed Services Technical Information Agency
1957-06-30
insert controlling DoD office). • DISTRIBUTION STATEMENT E . Distribution authorized to DoD Components only (fill in reason) (date of determination...Forecast of ASTIA Activity E Proposed DOD Directive re: Cataloging and Abstracting of Reports by Originators F Statistics on ASTIA...for resources, and ( e ) systems and proce- dures. External considerations of user requirements and user satis- faction were beyond the scope of
ERIC Educational Resources Information Center
Seastrom, Marilyn M.; Chapman, Chris; Stillwell, Robert; McGrath, Daniel; Peltola, Pia; Dinkes, Rachel; Xu, Zeyu
2006-01-01
The first volume of this report examines the existing measures of high school completion and the newly proposed proxy measures. This includes a description of the computational formulas, the data required for each indicator, the assumptions underlying each formula, the strengths and weaknesses of each indicator relative to a true cohort on-time…
ERIC Educational Resources Information Center
World Health Organization, Geneva (Switzerland).
A 1983 committee report is presented of the World Health Organization Expert Committee on the Education and Training of Nurse Teachers and Managers with Special Regard to Primary Health Care. After discussing the changing context of health care and trends in primary health care, changes required in education and training in health systems based on…
1983-10-19
knowledge -based symbolic reasoning, it nonetheless remains de- pendent on the lower levels of iconic processing for its raw information . Both sorts of...priori knowledge of where any particular line might go, and therefore no information regarding the extent of memory access required for the local...IC FILE COPY ,. c 4/t/7 ISG Report 104 IMAGE UNDERSTANDING RESEARCH Final Technical Report Covering Research Activity During the Period October 1
47 CFR 15.15 - General technical requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 1 2010-10-01 2010-10-01 false General technical requirements. 15.15 Section 15.15 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL RADIO FREQUENCY DEVICES General § 15.15 General technical requirements. (a) An intentional or unintentional radiator shall be...
47 CFR 80.659 - Technical requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 5 2010-10-01 2010-10-01 false Technical requirements. 80.659 Section 80.659 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES STATIONS IN THE MARITIME SERVICES Maritime Support Stations § 80.659 Technical requirements. The authorized frequency...
Emilio Segrè, the Antiproton, Technetium, and Astatine
of U238, DOE Technical Report, 1942 Spontaneous Fission, DOE Technical Report, November 1950 Observation of Antiprotons, DOE Technical Report, October 1955 Antiprotons, DOE Technical Report, November 1955 The Antiproton-Nucleon Annihilation Process (Antiproton Collaboration Experiment), DOE Technical
Tactical radar technology study. Volume 1: Executive summary
NASA Astrophysics Data System (ADS)
Rosien, R.; Cardone, L.; Hammers, D.; Klein, A.; Nozawa, E.
1980-03-01
This report presents results of a study to identify new technology required to provide advanced multi-threat performance capabilities in future tactical surveillance radar designs. A baseline design with optional subsystem characteristics has been synthesized to provide both functional and operational survivability in a dynamic and hostile situation postulated for the post 1985 time frame. Comparisons have been made of available technology with that required by the new baseline design to identify new technology requirements. Recommendations are presented for critical new technology programs including estimates of technical risks, costs and required development time.
9 CFR 351.17 - Identification required.
Code of Federal Regulations, 2012 CFR
2012-01-01
... INSPECTION AND CERTIFICATION CERTIFICATION OF TECHNICAL ANIMAL FATS FOR EXPORT Transportation and Exportation of Certified Technical Animal Fat § 351.17 Identification required. Certified technical animal fats... certified plants shall be accompanied by MP Form 85 (Declaration to Accompany Technical Animal Fats Between...
9 CFR 351.17 - Identification required.
Code of Federal Regulations, 2010 CFR
2010-01-01
... INSPECTION AND CERTIFICATION CERTIFICATION OF TECHNICAL ANIMAL FATS FOR EXPORT Transportation and Exportation of Certified Technical Animal Fat § 351.17 Identification required. Certified technical animal fats... certified plants shall be accompanied by MP Form 85 (Declaration to Accompany Technical Animal Fats Between...
9 CFR 351.17 - Identification required.
Code of Federal Regulations, 2013 CFR
2013-01-01
... INSPECTION AND CERTIFICATION CERTIFICATION OF TECHNICAL ANIMAL FATS FOR EXPORT Transportation and Exportation of Certified Technical Animal Fat § 351.17 Identification required. Certified technical animal fats... certified plants shall be accompanied by MP Form 85 (Declaration to Accompany Technical Animal Fats Between...
9 CFR 351.17 - Identification required.
Code of Federal Regulations, 2011 CFR
2011-01-01
... INSPECTION AND CERTIFICATION CERTIFICATION OF TECHNICAL ANIMAL FATS FOR EXPORT Transportation and Exportation of Certified Technical Animal Fat § 351.17 Identification required. Certified technical animal fats... certified plants shall be accompanied by MP Form 85 (Declaration to Accompany Technical Animal Fats Between...
9 CFR 351.17 - Identification required.
Code of Federal Regulations, 2014 CFR
2014-01-01
... INSPECTION AND CERTIFICATION CERTIFICATION OF TECHNICAL ANIMAL FATS FOR EXPORT Transportation and Exportation of Certified Technical Animal Fat § 351.17 Identification required. Certified technical animal fats... certified plants shall be accompanied by MP Form 85 (Declaration to Accompany Technical Animal Fats Between...
Consensus statement for use and technical requirements of thyroid ultrasound in endocrinology units.
Martín-Hernández, Tomás; Díez Gómez, Juan José; Díaz-Soto, Gonzalo; Torres Cuadro, Alberto; Navarro González, Elena; Oleaga Alday, Amelia; Sambo Salas, Marcel; Reverter Calatayud, Jordi L; Argüelles Jiménez, Iñaki; Mancha Doblas, Isabel; Fernández García, Diego; Galofré, Juan Carlos
2017-03-01
Thyroid nodule detection has increased with widespread use of ultrasound, which is currently the main tool for detection, monitoring, diagnosis and, in some instances, treatment of thyroid nodules. Knowledge of ultrasound and adequate instruction on its use require a position statement by the scientific societies concerned. The working groups on thyroid cancer and ultrasound techniques of the Spanish Society of Endocrinology and Nutrition have promoted this document, based on a thorough analysis of the current literature, the results of multicenter studies and expert consensus, in order to set the requirements for the best use of ultrasound in clinical practice. The objectives include the adequate framework for use of thyroid ultrasound, the technical and legal requirements, the clinical situations in which it is recommended, the levels of knowledge and learning processes, the associated responsibility, and the establishment of a standardized reporting of results and integration into hospital information systems and endocrinology units. Copyright © 2017 SEEN. Publicado por Elsevier España, S.L.U. All rights reserved.
NASA Technical Reports Server (NTRS)
Aguilar, Jerry L.
1989-01-01
The technical requirements for a shuttle-attached Moving Belt Radiator (MBR) experiment are defined. The MBR is an advanced radiator concept in which a rotating belt radiates thermal energy to space. The requirements for integrating the MBR experiment in the shuttle bay are discussed. Requirements for the belt material and working fluid are outlined along with some possible options. The proposed size and relationship to a full scale Moving Belt Radiator are defined. The experiment is defined with the primary goal of dynamic testing and a secondary goal of demonstrating the sealing and heat transfer characteristics. A perturbation system which will simulate a docking maneuver or other type of short term acceleration is proposed for inclusion in the experimental apparatus. A deployment and retraction capability which will aid in evaluating the dynamics of a belt during such a maneuver is also described. The proposed test sequence for the experiment is presented. Details of the conceptual design are not presented herein, but rather in a separate Final Report.
Technical approach to groundwater restoration. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-11-01
The Technical Approach to Groundwater Restoration (TAGR) provides general technical guidance to implement the groundwater restoration phase of the Uranium Mill Tailings Remedial Action (UMTRA) Project. The TAGR includes a brief overview of the surface remediation and groundwater restoration phases of the UMTRA Project and describes the regulatory requirements, the National Environmental Policy Act (NEPA) process, and regulatory compliance. A section on program strategy discusses program optimization, the role of risk assessment, the observational approach, strategies for meeting groundwater cleanup standards, and remedial action decision-making. A section on data requirements for groundwater restoration evaluates the data quality objectives (DQO) andmore » minimum data required to implement the options and comply with the standards. A section on sits implementation explores the development of a conceptual site model, approaches to site characterization, development of remedial action alternatives, selection of the groundwater restoration method, and remedial design and implementation in the context of site-specific documentation in the site observational work plan (SOWP) and the remedial action plan (RAP). Finally, the TAGR elaborates on groundwater monitoring necessary to evaluate compliance with the groundwater cleanup standards and protection of human health and the environment, and outlines licensing procedures.« less
Technical editing of research reports in biomedical journals.
Wager, Elizabeth; Middleton, Philippa
2008-10-08
Most journals try to improve their articles by technical editing processes such as proof-reading, editing to conform to 'house styles', grammatical conventions and checking accuracy of cited references. Despite the considerable resources devoted to technical editing, we do not know whether it improves the accessibility of biomedical research findings or the utility of articles. This is an update of a Cochrane methodology review first published in 2003. To assess the effects of technical editing on research reports in peer-reviewed biomedical journals, and to assess the level of accuracy of references to these reports. We searched The Cochrane Library Issue 2, 2007; MEDLINE (last searched July 2006); EMBASE (last searched June 2007) and checked relevant articles for further references. We also searched the Internet and contacted researchers and experts in the field. Prospective or retrospective comparative studies of technical editing processes applied to original research articles in biomedical journals, as well as studies of reference accuracy. Two review authors independently assessed each study against the selection criteria and assessed the methodological quality of each study. One review author extracted the data, and the second review author repeated this. We located 32 studies addressing technical editing and 66 surveys of reference accuracy. Only three of the studies were randomised controlled trials. A 'package' of largely unspecified editorial processes applied between acceptance and publication was associated with improved readability in two studies and improved reporting quality in another two studies, while another study showed mixed results after stricter editorial policies were introduced. More intensive editorial processes were associated with fewer errors in abstracts and references. Providing instructions to authors was associated with improved reporting of ethics requirements in one study and fewer errors in references in two studies, but no difference was seen in the quality of abstracts in one randomised controlled trial. Structuring generally improved the quality of abstracts, but increased their length. The reference accuracy studies showed a median citation error rate of 38% and a median quotation error rate of 20%. Surprisingly few studies have evaluated the effects of technical editing rigorously. However there is some evidence that the 'package' of technical editing used by biomedical journals does improve papers. A substantial number of references in biomedical articles are cited or quoted inaccurately.
2011-12-05
Report: Grant N00014-08-0331 Technical Objectives As critical components of advanced aircraft engines , turbine airfoils require coatings for...advanced aircrafi engines , turbine airfoils require coatings for enhancement of oxidation, corrosion and thermal capabilities . Airfoil coatings ofien...Oxidation and Corrosion Protection Coatings for Enhanced Thermo-Mechanical Durability of Turbine Airfoils 5b. GRANT NUMBER N00014-08-l-0331 5c
1983-08-01
constitutes a fundamental problem in many decision making processes. In business management we face this problem when determining the status of an...Tehiical Report 576 ( 1 ) 4 KNOWLEDGE REQUIREMENTS AND MANAGEMENT IN EXPERT DECISION SUPPORT SYSTEMS FOR (MILITARY) SITUATION ASSESSMENT MOOM sen...accomplished under contract for the Department of the Army The Israel Institute of Business Research Technical review by Robert H. Sasmor Joseph M
Evaluation and Validation (E&V) Team Public Report. Volume 5
1990-10-31
aspects, software engineering practices, etc. The E&V requirements which are developed will be used to guide the E&V technical effort. The currently...interoperability of Ada software engineering environment tools and data. The scope of the CAIS-A includes the functionality affecting transportability that is...requirement that they be CAIS conforming tools or data. That is, for example numerous CIVC data exist on special purpose software currently available
Hydraulic Testing of Polymer Matrix Composite 102mm Tube Section Technical Report
2018-04-01
Technical Report ARWSB-TR-18025 Hydraulic Testing of Polymer Matrix Composite 102mm Tube Section Technical Report Lucas B...1. REPORT DATE (DD-MM-YYYY) April 2018 2. REPORT TYPE Technical 3. DATES COVERED (From - To) 4. TITLE AND SUBTITLE Hydraulic Testing of...Polymer Matrix Composite 102mm Tube Section Technical Report 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER
Marketing information: The technical report as product
NASA Technical Reports Server (NTRS)
Stoher, F. F.; Pinelli, T. E.
1981-01-01
Technical reports constitute a product, the primary means for communicating the results of research to the user. The Langley scientific and technical information (STI) review and evaluation project undertook a review of the technical report as an effective product for information communication. Style manuals describing theory and practice in technical report preparation; publication manuals covering such factors as design, layout, and type style; and copies of technical reports were obtained from industrial, academic, governmental, and research organizations. Based on an analysis of this material, criteria will be established for the report components, for the relationship of the components within the report context, and for the overall report organization. The criteria will be used as bench marks and compared with the publication standards currently used to prepare NASA technical reports.
NASA Software Documentation Standard
NASA Technical Reports Server (NTRS)
1991-01-01
The NASA Software Documentation Standard (hereinafter referred to as "Standard") is designed to support the documentation of all software developed for NASA; its goal is to provide a framework and model for recording the essential information needed throughout the development life cycle and maintenance of a software system. The NASA Software Documentation Standard can be applied to the documentation of all NASA software. The Standard is limited to documentation format and content requirements. It does not mandate specific management, engineering, or assurance standards or techniques. This Standard defines the format and content of documentation for software acquisition, development, and sustaining engineering. Format requirements address where information shall be recorded and content requirements address what information shall be recorded. This Standard provides a framework to allow consistency of documentation across NASA and visibility into the completeness of project documentation. The basic framework consists of four major sections (or volumes). The Management Plan contains all planning and business aspects of a software project, including engineering and assurance planning. The Product Specification contains all technical engineering information, including software requirements and design. The Assurance and Test Procedures contains all technical assurance information, including Test, Quality Assurance (QA), and Verification and Validation (V&V). The Management, Engineering, and Assurance Reports is the library and/or listing of all project reports.
Heat Melt Compactor Development Progress
NASA Technical Reports Server (NTRS)
Lee, Jeffrey M.; Fisher, John W.; Pace, Gregory
2017-01-01
The status of the Heat Melt Compactor (HMC) development project is reported. HMC Generation 2 (Gen 2) has been assembled and initial testing has begun. A baseline mission use case for trash volume reduction, water recovery, trash sterilization, and the venting of effluent gases and water vapor to space has been conceptualized. A test campaign to reduce technical risks is underway. This risk reduction testing examines the many varied operating scenarios and conditions needed for processing trash during a space mission. The test results along with performance characterization of HMC Gen 2 will be used to prescribe requirements and specifications for a future ISS flight Technology Demonstration. We report on the current status, technical risks, and test results in the context of an ISS vent-to-space Technology Demonstration.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Green, D.W.; Heinrich, R.R.; Jensen, K.J.
The Analytical Chemistry Laboratory is a full-cost-recovery service center, with the primary mission of providing a broad range of technical support services to the scientific and engineering programs at ANL. In addition, ACL conducts a research program in analytical chemistry, works on instrumental and methods development, and provides analytical services for governmental, educational, and industrial organizations. The ACL handles a wide range of analytical problems, from routine standard analyses to unique problems that require significant development of methods and techniques. The purpose of this report is to summarize the technical and administrative activities of the Analytical Chemistry Laboratory (ACL) atmore » Argonne National Laboratory (ANL) for Fiscal Year 1985 (October 1984 through September 1985). This is the second annual report for the ACL. 4 figs., 1 tab.« less
13 CFR 306.2 - Award requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... TRAINING, RESEARCH AND TECHNICAL ASSISTANCE INVESTMENTS Local and National Technical Assistance § 306.2 Award requirements. EDA selects Projects for Local and National Technical Assistance Investments in...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-25
... Information Collection: Technical Processing Requirements for Multifamily Project Mortgage Insurance AGENCY: Office of the Chief Information Officer, HUD. ACTION: Notice. SUMMARY: HUD has submitted the proposed... Information Collection Title of Information Collection: Technical Processing Requirements for Multifamily...
DOT National Transportation Integrated Search
2008-09-01
The Resilient Modulus (Mr) of pavement materials and subgrades is an important input : parameter for the design of pavement structures. The Repeated Loading Triaxial (RLT) test : typically determines Mr. However, the RLT test requires well trained pe...
Space station automation study. Volume 2: Technical report. Autonomous systems and assembly
NASA Technical Reports Server (NTRS)
1984-01-01
The application of automation to space station functions is discussed. A summary is given of the evolutionary functions associated with long range missions and objectives. Mission tasks and requirements are defined. Space station sub-systems, mission models, assembly, and construction are discussed.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Peters, T. B.; Bannochie, C. J.
Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of verification of Macrobatch (Salt Batch) 11 for the Interim Salt Disposition Program (ISDP) for processing. This document reports characterization data on the samples of Tank 21H and fulfills the requirements of Deliverable 3 of the Technical Task Request (TTR).
7 CFR 3402.23 - Documentation of progress on funded projects.
Code of Federal Regulations, 2011 CFR
2011-01-01
... the academic program due to unsatisfactory academic progress; or voluntarily withdraws from the Fellowship or the academic program. If a Fellow has not completed all degree requirements at the end of the... database contains narrative project information, progress/impact statements, and final technical reports...
7 CFR 3402.23 - Documentation of progress on funded projects.
Code of Federal Regulations, 2014 CFR
2014-01-01
... the academic program due to unsatisfactory academic progress; or voluntarily withdraws from the Fellowship or the academic program. If a Fellow has not completed all degree requirements at the end of the... database contains narrative project information, progress/impact statements, and final technical reports...
7 CFR 3402.23 - Documentation of progress on funded projects.
Code of Federal Regulations, 2012 CFR
2012-01-01
... the academic program due to unsatisfactory academic progress; or voluntarily withdraws from the Fellowship or the academic program. If a Fellow has not completed all degree requirements at the end of the... database contains narrative project information, progress/impact statements, and final technical reports...
7 CFR 3402.23 - Documentation of progress on funded projects.
Code of Federal Regulations, 2013 CFR
2013-01-01
... the academic program due to unsatisfactory academic progress; or voluntarily withdraws from the Fellowship or the academic program. If a Fellow has not completed all degree requirements at the end of the... database contains narrative project information, progress/impact statements, and final technical reports...
Graduate Studies in Education. Volume 1, Number 3.
ERIC Educational Resources Information Center
Courtney, E. Wayne, Comp.; Heineke, William F., Comp.
As one part of a volume of abstracts of studies of the last decade primarily in the vocational and technical field, this report includes 213 abstracts in the categories of administration, curriculum, and evaluation. Abstracts in administration treat building programs, certification and qualification requirements, cooperative programs, cost…
16 CFR § 1115.26 - Guidelines and policies.
Code of Federal Regulations, 2013 CFR
2013-01-01
... REGULATIONS SUBSTANTIAL PRODUCT HAZARD REPORTS Guidelines and Requirements for Mandatory Recall Notices § 1115... minimize the use of highly technical or legal terminology. (3) A recall notice should be targeted and...; (ii) Computer, radio, television, or other electronic transmission or medium; (iii) Video news release...
16 CFR § 1401.5 - Providing performance and technical data to purchasers by labeling.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 16 Commercial Practices 2 2013-01-01 2013-01-01 false Providing performance and technical data to...: REQUIREMENTS TO PROVIDE THE COMMISSION WITH PERFORMANCE AND TECHNICAL DATA; REQUIREMENTS TO NOTIFY CONSUMERS AT POINT OF PURCHASE OF PERFORMANCE AND TECHNICAL DATA § 1401.5 Providing performance and technical data to...
Bru, Juan; Berger, Christopher A
2012-01-01
Background Point-of-care electronic medical records (EMRs) are a key tool to manage chronic illness. Several EMRs have been developed for use in treating HIV and tuberculosis, but their applicability to primary care, technical requirements and clinical functionalities are largely unknown. Objectives This study aimed to address the needs of clinicians from resource-limited settings without reliable internet access who are considering adopting an open-source EMR. Study eligibility criteria Open-source point-of-care EMRs suitable for use in areas without reliable internet access. Study appraisal and synthesis methods The authors conducted a comprehensive search of all open-source EMRs suitable for sites without reliable internet access. The authors surveyed clinician users and technical implementers from a single site and technical developers of each software product. The authors evaluated availability, cost and technical requirements. Results The hardware and software for all six systems is easily available, but they vary considerably in proprietary components, installation requirements and customisability. Limitations This study relied solely on self-report from informants who developed and who actively use the included products. Conclusions and implications of key findings Clinical functionalities vary greatly among the systems, and none of the systems yet meet minimum requirements for effective implementation in a primary care resource-limited setting. The safe prescribing of medications is a particular concern with current tools. The dearth of fully functional EMR systems indicates a need for a greater emphasis by global funding agencies to move beyond disease-specific EMR systems and develop a universal open-source health informatics platform. PMID:22763661
Advanced Gas Turbine (AGT) Technology Development Project
NASA Technical Reports Server (NTRS)
1987-01-01
This report is the eleventh in the series of Technical Summary reports for the Advanced Gas Turbine (AGT) Technology Development Project, authorized under NASA Contract DEN3-167, and sponsored by the Department of Energy (DOE). This report was prepared by Garrett Turbine Engine Company, A Division of the Garrett Corporation, and includes information provided by Ford Motor Company, the Standard Oil Company, and AiResearch Casting Company. This report covers plans and progress for the period July 1, 1985 through June 30, 1986. Technical progress during the reported period was highlighted by the 85-hour endurance run of an all-ceramic engine operating in the 2000 to 2250 F temperature regime. Component development continued in the areas of the combustion/fuel injection system, regenerator and seals system, and ceramic turbine rotor attachment design. Component rig testing saw further refinements. Ceramic materials showed continued improvements in required properties for gas turbine applications; however, continued development is needed before performance and reliability goals can be set.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-01
... Information Collection: Technical Processing Requirements for Multifamily Project Mortgage Insurance AGENCY: Office of the Chief Information Officer, HUD. ACTION: Correction, notice. SUMMARY: On October 25, 2013 at... Collection Title of Information Collection: Technical Processing Requirements for Multifamily Project...
47 CFR 15.517 - Technical requirements for indoor UWB systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 1 2010-10-01 2010-10-01 false Technical requirements for indoor UWB systems. 15.517 Section 15.517 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL RADIO FREQUENCY DEVICES Ultra-Wideband Operation § 15.517 Technical requirements for indoor UWB systems. (a) Operation...
47 CFR 15.511 - Technical requirements for surveillance systems.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 47 Telecommunication 1 2013-10-01 2013-10-01 false Technical requirements for surveillance systems... DEVICES Ultra-Wideband Operation § 15.511 Technical requirements for surveillance systems. (a) The UWB... surveillance systems operated by law enforcement, fire or emergency rescue organizations or by manufacturers...
47 CFR 15.511 - Technical requirements for surveillance systems.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 47 Telecommunication 1 2012-10-01 2012-10-01 false Technical requirements for surveillance systems... DEVICES Ultra-Wideband Operation § 15.511 Technical requirements for surveillance systems. (a) The UWB... surveillance systems operated by law enforcement, fire or emergency rescue organizations or by manufacturers...
47 CFR 15.511 - Technical requirements for surveillance systems.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 1 2011-10-01 2011-10-01 false Technical requirements for surveillance systems... DEVICES Ultra-Wideband Operation § 15.511 Technical requirements for surveillance systems. (a) The UWB... surveillance systems operated by law enforcement, fire or emergency rescue organizations or by manufacturers...
47 CFR 15.511 - Technical requirements for surveillance systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 1 2010-10-01 2010-10-01 false Technical requirements for surveillance systems... DEVICES Ultra-Wideband Operation § 15.511 Technical requirements for surveillance systems. (a) The UWB... surveillance systems operated by law enforcement, fire or emergency rescue organizations or by manufacturers...
47 CFR 15.511 - Technical requirements for surveillance systems.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 47 Telecommunication 1 2014-10-01 2014-10-01 false Technical requirements for surveillance systems... DEVICES Ultra-Wideband Operation § 15.511 Technical requirements for surveillance systems. (a) The UWB... surveillance systems operated by law enforcement, fire or emergency rescue organizations or by manufacturers...
30 CFR 7.404 - Technical requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Technical requirements. 7.404 Section 7.404 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR TESTING, EVALUATION, AND... Cable Splice Kits § 7.404 Technical requirements. (a) Electric cables and splices shall be flame...
Review of PREPA Technical Requirements for Interconnecting Wind and Solar Generation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gevorgian, Vahan; Booth, Sarah
2013-11-01
The Puerto Rico Electric Power Authority developed the minimum technical requirements for interconnection of wind turbine generation and photovoltaic power plants. NREL has conducted a review of these requirements based on generic technical aspects and electrical characteristics of wind and photovoltaic power plants, and on existing requirements from other utilities (both U.S. and European).
Technical basis for external dosimetry at the Waste Isolation Pilot Plant (WIPP)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bradley, E.W.; Wu, C.F.; Goff, T.E.
1993-12-31
The WIPP External Dosimetry Program, administered by Westinghouse Electric Corporation, Waste Isolation Division, for the US Department of Energy (DOE), provides external dosimetry support services for operations at the Waste Isolation Pilot Plant (WIPP) Site. These operations include the receipt, experimentation with, storage, and disposal of transuranic (TRU) wastes. This document describes the technical basis for the WIPP External Radiation Dosimetry Program. The purposes of this document are to: (1) provide assurance that the WIPP External Radiation Dosimetry Program is in compliance with all regulatory requirements, (2) provide assurance that the WIPP External Radiation Dosimetry Program is derived from amore » sound technical base, (3) serve as a technical reference for radiation protection personnel, and (4) aid in identifying and planning for future needs. The external radiation exposure fields are those that are documented in the WIPP Final Safety Analysis Report.« less
Center for Space Microelectronics Technology. 1993 Technical Report
NASA Technical Reports Server (NTRS)
1995-01-01
The 1993 Technical Report of the Jet Propulsion Laboratory Center for Space Microelectronics Technology summarizes the technical accomplishments, publications, presentations, and patents of the Center during the past year. The report lists 170 publications, 193 presentations, and 84 New Technology Reports and patents. The 1993 Technical Report of the Jet Propulsion Laboratory Center for Space Microelectronics Technology summarizes the technical accomplishments, publications, presentations, and patents of the Center during the past year. The report lists 170 publications, 193 presentations, and 84 New Technology Reports and patents.
48 CFR 435.010 - Scientific and technical reports.
Code of Federal Regulations, 2011 CFR
2011-10-01
... CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 435.010 Scientific and technical reports... all scientific and technical reports to the National Technical Information Service at the address... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Scientific and technical...
Evaluation of Flight Attendant Technical Knowledge
NASA Technical Reports Server (NTRS)
Dunbar, Melisa G.; Chute, Rebecca D.; Rosekind, Mark (Technical Monitor)
1997-01-01
Accident and incident reports have indicated that flight attendants have numerous opportunities to provide the flight-deck crew with operational information that may prevent or lessen the severity of a potential problem. Additionally, as carrier fleets transition from three person to two person flight-deck crews, the reliance upon the cabin crew for the transfer of this information may increase further. Recent research indicates that flight attendants do not feel confident in their ability to describe mechanical parts or malfunctions of the aircraft, and the lack of flight attendant technical training has been referenced in a number of recent reports. Chute and Wiener describe five factors which may produce communication barriers between cockpit and cabin crews: the historical background of aviation, the physical separation of the two crews, psychosocial issues, regulatory factors, and organizational factors. By examining these areas of division we can identify possible bridges and address the implications of deficient cockpit/cabin communication on flight safety. Flight attendant operational knowledge may provide some mitigation of these barriers. The present study explored both flight attendant technical knowledge and flight attendant and pilot expectations of flight attendant technical knowledge. To assess the technical knowledge of cabin crewmembers, 177 current flight attendants from two U.S. carriers voluntarily completed a 13-item technical quiz. To investigate expectations of flight attendant technical knowledge, 181 pilots and a second sample of 96 flight attendants, from the same two airlines, completed surveys designed to capture each group's expectations of operational knowledge required of flight attendants. Analyses revealed several discrepancies between the present level of flight attendant operational knowledge and pilots' and flight attendants' expected and desired levels of technical knowledge. Implications for training will be discussed.
47 CFR 15.513 - Technical requirements for medical imaging systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 1 2010-10-01 2010-10-01 false Technical requirements for medical imaging systems. 15.513 Section 15.513 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL RADIO FREQUENCY DEVICES Ultra-Wideband Operation § 15.513 Technical requirements for medical imaging systems. (a) The UWB...
77 FR 29247 - Federal Motor Vehicle Safety Standards; Occupant Crash Protection
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-17
...). ACTION: Final rule; technical amendments. SUMMARY: This final rule makes technical amendments to Federal... advanced air bag requirements. As written now, the general warning label requirements contain an explicit... equipment requirements for restraint systems. This document makes technical amendments to several of the...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-12
... DEPARTMENT OF HEALTH AND HUMAN SERVICES Food and Drug Administration [Docket No. FDA-2010-D-0165] International Cooperation on Harmonisation of Technical Requirements for Registration of Veterinary Medicinal... veterinary use by the International Cooperation on Harmonisation of Technical Requirements for Registration...
Model format for a vaccine stability report and software solutions.
Shin, Jinho; Southern, James; Schofield, Timothy
2009-11-01
A session of the International Association for Biologicals Workshop on Stability Evaluation of Vaccine, a Life Cycle Approach was devoted to a model format for a vaccine stability report, and software solutions. Presentations highlighted the utility of a model format that will conform to regulatory requirements and the ICH common technical document. However, there need be flexibility to accommodate individual company practices. Adoption of a model format is premised upon agreement regarding content between industry and regulators, and ease of use. Software requirements will include ease of use and protections against inadvertent misspecification of stability design or misinterpretation of program output.
Pilot Aircraft Interface Objectives/Rationale
NASA Technical Reports Server (NTRS)
Shively, Jay
2010-01-01
Objective: Database and proof of concept for guidelines for GCS compliance a) Rationale: 1) Provide research test-bed to develop guidelines. 2) Modify GCS for NAS Compliance to provide proof of concept. b) Approach: 1) Assess current state of GCS technology. 2) Information Requirements Definition. 3) SME Workshop. 4) Modify an Existing GCS for NAS Compliance. 5) Define exemplar UAS (choose system to develop prototype). 6) Define Candidate Displays & Controls. 7) Evaluate/ refine in Simulations. 8) Demonstrate in flight. c) Deliverables: 1) Information Requirements Report. 2) Workshop Proceedings. 3) Technical Reports/ papers on Simulations & Flight Demo. 4) Database for guidelines.
HLLV avionics requirements study and electronic filing system database development
NASA Technical Reports Server (NTRS)
1994-01-01
This final report provides a summary of achievements and activities performed under Contract NAS8-39215. The contract's objective was to explore a new way of delivering, storing, accessing, and archiving study products and information and to define top level system requirements for Heavy Lift Launch Vehicle (HLLV) avionics that incorporate Vehicle Health Management (VHM). This report includes technical objectives, methods, assumptions, recommendations, sample data, and issues as specified by DPD No. 772, DR-3. The report is organized into two major subsections, one specific to each of the two tasks defined in the Statement of Work: the Index Database Task and the HLLV Avionics Requirements Task. The Index Database Task resulted in the selection and modification of a commercial database software tool to contain the data developed during the HLLV Avionics Requirements Task. All summary information is addressed within each task's section.
Life Sciences Centrifuge Facility assessment
NASA Technical Reports Server (NTRS)
Benson, Robert H.
1994-01-01
This report provides an assessment of the status of the Centrifuge Facility being developed by ARC for flight on the International Space Station Alpha. The assessment includes technical status, schedules, budgets, project management, performance of facility relative to science requirements, and identifies risks and issues that need to be considered in future development activities.
Solar energy system performance evaluation report for IBM System 3, Glendo, Wyoming
NASA Technical Reports Server (NTRS)
1980-01-01
The analysis used was based on instrumented system data monitored and collected for at least one full season of operation. The long-term field performance of the installed system is described. Technical contributions to the definition of techniques and requirements for solar energy system design are given.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-28
... programs, Homeless Management Information System (HMIS) data collection, reporting and research, including..., HUD. ACTION: Notice. SUMMARY: HUD announces the availability of the applicant information, deadline information, and other requirements for the Fiscal Year (FY) 2010 Special Needs Assistance Programs Technical...
Chapter 7: Developing collaboration and cooperation
G. Bartlett
2012-01-01
Good forestry practices require onsite flexibility. A core concept in U.S. Forest Service General Technical Report PSW-GTR-220 "An Ecosystem Management Strategy for Sierran Mixed-Conifer Forests" (North et al. 2009) is that management treatments and thinning intensity should differ depending on local forest conditions and topographic location. In the...
Skills Conversion Project, Chapter 8, Pollution Control. Final Report.
ERIC Educational Resources Information Center
National Society of Professional Engineers, Washington, DC.
The Skills Conversion Project conducted by the National Society of Professional Engineers sought to study the transition mechanisms required to transfer available technical manpower from aerospace and defense industries into other areas of employment in private industry and public service. Fourteen study teams assessed the likelihood of future…
75 FR 32658 - Change of Contact Information; Technical Amendment
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-09
... nonsubstantive content. List of Subjects 21 CFR Part 106 Food grades and standards, Infants and children, Nutrition, Reporting and recordkeeping requirements. 21 CFR Part 107 Food labeling, Infants and children..., 21 CFR Chapter I is amended as follows: PART 106--INFANT FORMULA QUALITY CONTROL PROCEDURES 0 1. The...
Light Aircraft Piston Engine Carburetor Ice Detector/Warning Device Sensitivity/Effectiveness.
1982-06-01
10kHz max), converting raw data into engineering units as established by operator, displaying eight different parameters on cathode ray tube (CRT) and...TN No. 1790, February 1949. f. icing - Protection Requirements for Reciprocating Engine Induction Systems, NCA Technical Report No. 982, June 1949. q
30 CFR 90.220 - Status change reports.
Code of Federal Regulations, 2014 CFR
2014-07-01
... Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH... Procedures § 90.201 Sampling; general and technical requirements. (a) An approved coal mine dust personal sampler unit (CMDPSU) shall be used to take samples of the concentration of respirable coal mine dust in...
21 CFR 1002.3 - Notification to user of performance and technical data.
Code of Federal Regulations, 2010 CFR
2010-04-01
... data. 1002.3 Section 1002.3 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) RADIOLOGICAL HEALTH RECORDS AND REPORTS General Provisions § 1002.3 Notification to... Radiological Health, as authorized under delegated authority, may require a manufacturer of a radiation...
NASA Technical Reports Server (NTRS)
Phillips, Roger J.
1992-01-01
The Final Technical Report on tectonic evolution of Mars is presented. Two papers and an abstract are included. Topics addressed include: scientific rationale and requirements for a global seismic network on Mars, permanent uplift in magmatic systems with application to the Tharsis Region of Mars, and the geophysical signal of the Martian global dichotomy.
DOT National Transportation Integrated Search
1980-10-01
This report describes the methods used in the evaluation of a new continuous-flow, phase-dilution passenger oxygen mask for compliance to FAA technical Standard Order (TSO)-C64 requirements. Data presented include end expiratory partial pressures for...
Strategies for monitoring terrestrial animals and habitats
Richard Holthausen; Raymond L. Czaplewski; Don DeLorenzo; Greg Hayward; Winifred B. Kessler; Pat Manley; Kevin S. McKelvey; Douglas S. Powell; Leonard F. Ruggiero; Michael K. Schwartz; Bea Van Horne; Christina D. Vojta
2005-01-01
This General Technical Report (GTR) addresses monitoring strategies for terrestrial animals and habitats. It focuses on monitoring associated with National Forest Management Act planning and is intended to apply primarily to monitoring efforts that are broader than individual National Forests. Primary topics covered in the GTR are monitoring requirements; ongoing...
2001-09-01
Development ( LDRD ) program, which formalized a long-standing policy of allowing its multi-program national laboratories discretion to conduct self...initiated, independent research and development (R&D). DOE requires that LDRD work must focus on the advanced study of scientific or technical problems...
Technologies of the '80s: Their Impact on Technical Occupations.
ERIC Educational Resources Information Center
Jaffe, J. A., Ed.; And Others
This report is one of seven that identify major new and emerging technological advances expected to influence major vocational education program areas and to describe the programmatic implications in terms of skill-knowledge requirements, occupations most directly affected, and the anticipated diffusion rate. Chapter 1 considers technology as…
Biological Simulations in Distance Learning. CAL Research Group Technical Report No. 12.
ERIC Educational Resources Information Center
Murphy, P. J.
When two biological simulations on evolution and genetics (one originally developed for a conventional university undergraduate course) were introduced into Open University distance education classes, the difficulties encountered required a reappraisal of the concept of using computer simulation for distance learning and decisions on which…
A Strategy for Efficiently Verifying Requirements Specifications Using Composition and Invariants
2003-09-05
Colle - sur - Loup , France, Oct. 1984. Springer-Verlag. [34] J. Ramish. Empirical studies of compositional abstraction. Technical report, Naval Research...global to modular temporal rea- soning about programs. In K. R. Apt, editor, Proc. NATO Adv. Study Inst. on Logics and Models of Concurrent Systems, La
40 CFR 1043.70 - General recordkeeping and reporting requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
... POLLUTION CONTROLS CONTROL OF NOX, SOX, AND PM EMISSIONS FROM MARINE ENGINES AND VESSELS SUBJECT TO THE... operators of non-Party vessels must keep these records as specified in the NOX Technical Code and... operator has fuel receipts (or equivalent records) for the preceding three years showing it operated using...
40 CFR 1043.70 - General recordkeeping and reporting requirements.
Code of Federal Regulations, 2012 CFR
2012-07-01
... POLLUTION CONTROLS CONTROL OF NOX, SOX, AND PM EMISSIONS FROM MARINE ENGINES AND VESSELS SUBJECT TO THE... operators of non-Party vessels must keep these records as specified in the NOX Technical Code and... operator has fuel receipts (or equivalent records) for the preceding three years showing it operated using...
40 CFR 1043.70 - General recordkeeping and reporting requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
... POLLUTION CONTROLS CONTROL OF NOX, SOX, AND PM EMISSIONS FROM MARINE ENGINES AND VESSELS SUBJECT TO THE... operators of non-Party vessels must keep these records as specified in the NOX Technical Code and... operator has fuel receipts (or equivalent records) for the preceding three years showing it operated using...
40 CFR 1043.70 - General recordkeeping and reporting requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... POLLUTION CONTROLS CONTROL OF NOX, SOX, AND PM EMISSIONS FROM MARINE ENGINES AND VESSELS SUBJECT TO THE... operators of non-Party vessels must keep these records as specified in the NOX Technical Code and... operator has fuel receipts (or equivalent records) for the preceding three years showing it operated using...
40 CFR 1043.70 - General recordkeeping and reporting requirements.
Code of Federal Regulations, 2014 CFR
2014-07-01
... POLLUTION CONTROLS CONTROL OF NOX, SOX, AND PM EMISSIONS FROM MARINE ENGINES AND VESSELS SUBJECT TO THE... operators of non-Party vessels must keep these records as specified in the NOX Technical Code and... operator has fuel receipts (or equivalent records) for the preceding three years showing it operated using...
Project Trade Related Reading Packets for Disabled Readers. Final Report 1984-85.
ERIC Educational Resources Information Center
Davis, Beverly; Woodruff, Nancy S.
A comprehensive, shop-related curriculum was developed for special needs students who are severely disabled readers. The basic approach of the curriculum was to provide individualized diagnostic-prescriptive materials that correlate basic reading skills and the required vocational and technical concepts. Trade-related packets were written for…
Phonics Instruction for Disabled Learners: Applying Theory to Method. Technical Report # 7.
ERIC Educational Resources Information Center
Fayne, Harriet R.
To design effective remedial phonics instruction, it is necessary to examine both learner characteristics and task requirements. The paper integrates research related to information processing and psycholinguistics to formulate questions which can be used to evaluate techniques and materials used with a learning disabled population. Information…
NASA Astrophysics Data System (ADS)
Chen, Liang; Zong, Jianfang; Guo, Huiting; Sun, Liang; Liu, Mei
2018-05-01
Standardization is playing an increasingly important role in reducing greenhouse gas emission and in climatic change adaptation, especially in the “three” greenhouse gas emission aspects (measurement, report, verification). Standardization has become one of the most important ways in mitigating the global climate change. Standardization Administration of China (SAC) has taken many productive measures in actively promoting standardization work to cope with climate change. In April 2014, SAC officially approved the establishment of “National Carbon Emission Management Standardization Technical Committee” In November 2015, SAC officially issued the first 11 national standards on carbon management including <
40 CFR 58.11 - Network technical requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 5 2010-07-01 2010-07-01 false Network technical requirements. 58.11... (CONTINUED) AMBIENT AIR QUALITY SURVEILLANCE Monitoring Network § 58.11 Network technical requirements. (a)(1... A to this part when operating the SLAMS networks. (2) Beginning January 1, 2009, State and local...
40 CFR 58.11 - Network technical requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 5 2011-07-01 2011-07-01 false Network technical requirements. 58.11... (CONTINUED) AMBIENT AIR QUALITY SURVEILLANCE Monitoring Network § 58.11 Network technical requirements. (a)(1... A to this part when operating the SLAMS networks. (2) Beginning January 1, 2009, State and local...
47 CFR 15.510 - Technical requirements for through D-wall imaging systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 1 2010-10-01 2010-10-01 false Technical requirements for through D-wall imaging systems. 15.510 Section 15.510 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL RADIO FREQUENCY DEVICES Ultra-Wideband Operation § 15.510 Technical requirements for through D-wall imaging...