Code of Federal Regulations, 2010 CFR
2010-01-01
... requirements set forth in this part 802 describe certain specifications, tolerances, and other technical... Standards and Technology (NIST) Handbook 44, “Specifications, Tolerances, and Other Technical Requirements...), “Specifications and Tolerances for Reference Standards and Field Standard Weights and Measures,” (Handbook 105-1...
ERIC Educational Resources Information Center
Zirkle, Christopher J.; Jeffery, Jeremy O.
2017-01-01
The current climate of career and technical administration requirements in all 50 states was detailed and explored. An increasing number of states are not requiring specific career-technical administration certification/licensure in order to oversee secondary career and technical education (CTE) programs, with more states moving towards a general…
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1997-11-01
This study, conducted by Black & Veatch, was funded by the U.S. Trade and Development Agency. The report, produced for the Ministry of National Resources, Energy and Environment (MNRE) of Swaziland, determines the least cost capacity expansion option to meet the future power demand and system reliability criteria of Swaziland, with particular emphasis on the proposed Interconnector between Swaziland and Mozambique. Volume 3 contains EPC Specifications and is divided into the following divisions: (1) Commercial; (2) General Technical Requirements; (3) Transmission Line Technical Requirements; (4) Substation Technical Requirements; (5) Specifications.
11 CFR 9033.12 - Production of computerized information.
Code of Federal Regulations, 2012 CFR
2012-01-01
... conform to the technical specifications, including file requirements, described in the Federal Election Commission's Computerized Magnetic Media Requirements for title 26 Candidates/Committees Receiving Federal... outstanding campaign obligations. (b) Organization of computerized information and technical specifications...
11 CFR 9033.12 - Production of computerized information.
Code of Federal Regulations, 2014 CFR
2014-01-01
... conform to the technical specifications, including file requirements, described in the Federal Election Commission's Computerized Magnetic Media Requirements for title 26 Candidates/Committees Receiving Federal... outstanding campaign obligations. (b) Organization of computerized information and technical specifications...
11 CFR 9033.12 - Production of computerized information.
Code of Federal Regulations, 2013 CFR
2013-01-01
... conform to the technical specifications, including file requirements, described in the Federal Election Commission's Computerized Magnetic Media Requirements for title 26 Candidates/Committees Receiving Federal... outstanding campaign obligations. (b) Organization of computerized information and technical specifications...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-20
... Ventilation System Surveillance Requirements To Operate for 10 Hours per Month,'' Using the Consolidated Line... currently require operating the ventilation system for at least 10 continuous hours with the heaters... Technical Specifications (TSs) Task Force (TSTF) Traveler TSTF-522, Revision 0, ``Revise Ventilation System...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-22
... Ventilation System Surveillance Requirements to Operate for 10 hours per Month.'' DATES: Comment period....1, which currently require operating the heaters in the respective systems for at least 10... Adoption of Technical Specifications Task Force Traveler TSTF-522, Revision 0, ``Revise Ventilation System...
Edwin I. Hatch nuclear plant implementation of improved technical specifications
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mahler, S.R.; Pendry, D.
1994-12-31
Edwin I. Hatch nuclear plant consists of two General Electric boiling water reactor/4 units, with a common control room and a common refueling floor. In March 1993, Hatch began conversion of both units` technical specifications utilizing NUREG 1433. The technical specifications amendment request was submitted February 25, 1994. Issuance is scheduled for October 21, 1994, with implementation on March 15, 1994. The current unit-1 technical specifications are in the {open_quotes}custom{close_quotes} format, and the unit-2 technical specifications are in the old standard format. Hatch previously relocated the fire protection and radiological technical specifications requirements. The Hatch conversion will provide consistency betweenmore » the two units, to the extent practicable.« less
Prefocal station mechanical design concept study for the E-ELT
NASA Astrophysics Data System (ADS)
Jolley, Paul; Brunetto, Enzo; Frank, Christoph; Lewis, Steffan; Marchetti, Enrico
2016-07-01
The Nasmyth platforms of the E-ELT will contain one Prefocal Station (PFS) each. The main PFS functional requirements are to provide a focal plane to the three Nasmyth focal stations and the Coudé focus, optical sensing supporting telescope low order optimisation and seeing limited image quality, and optical sensing supporting characterising and phasing of M1 and other telescope subsystems. The PFS user requirements are used to derive the PFS technical requirements specification that will form the basis for design, development and production of the system. This specification process includes high-level architectural decisions and technical performance budget allocations. The mechanical design concepts reported here have been developed in order to validate key system specifications and associated technical budgets.
Using Niche-Market Magazines to Teach Audience
ERIC Educational Resources Information Center
Tichenor, Stuart
2006-01-01
In technical writing classes, audience is one of the most important concepts. Technical writing is typically written to a specific audience for a specific purpose. In addition, as audiences change, so must the way a document is written. An audience's lack of knowledge in a technical area, for example, would require more background information or…
DOT National Transportation Integrated Search
1975-08-01
This report outlines the engineering requirements for an Airborne Laser Remote Sensor for Oil Detection and Classification System. Detailed engineering requirements are given for the major units of the system. Technical considerations pertinent to a ...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Young, T.E.; Magleby, E.H.
1985-09-06
A review was performed of reports required by federal regulations and the plant-specific radiological effluent technical specifications (RETS) for operations conducted at Tennessee Valley Authority's Browns Ferry Nuclear Station, Units 1, 2, and 3, during 1983. The two periodic reports reviewed were (a) the Effluents and Waste Disposal Semiannual Report, First Half 1983 and (b) the Effluents and Waste Disposal Semiannual Report, Second Half 1983. The principal review guidelines were the plant's specific RETs and NRC guidance given in NUREG-0133, ''Preparation of Radiological Effluent Technical Specifications for Nuclear Power Plants.'' The Licensee's submitted reports were found to be reasonably completemore » and consistent with the review guidelines.« less
75 FR 41404 - List of Approved Spent Fuel Storage Casks: NUHOMS®
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-16
.... The NRC is taking this action because the applicant identified that a certain Technical Specification (TS) for Boral characterization was not written precisely. Specifically, the requirements for meeting... changes to the technical specifications. The NRC also published a direct final rule on May 6, 2010 (75 FR...
30 CFR 250.806 - Safety and pollution prevention equipment quality assurance requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
... Gas Operations (as incorporated by reference in § 250.198); and (ii) API Spec Q1, Specification for... in § 250.198). (3) All SSV's and USV's must meet the technical specifications of API Spec 6A and 6AV1. All SSSVs must meet the technical specifications of API Specification 14A (as incorporated by...
30 CFR 250.806 - Safety and pollution prevention equipment quality assurance requirements.
Code of Federal Regulations, 2014 CFR
2014-07-01
... Gas Operations (as incorporated by reference in § 250.198); and (ii) API Spec Q1, Specification for... in § 250.198). (3) All SSV's and USV's must meet the technical specifications of API Spec 6A and 6AV1. All SSSVs must meet the technical specifications of API Specification 14A (as incorporated by...
30 CFR 250.806 - Safety and pollution prevention equipment quality assurance requirements.
Code of Federal Regulations, 2012 CFR
2012-07-01
... Gas Operations (as incorporated by reference in § 250.198); and (ii) API Spec Q1, Specification for... in § 250.198). (3) All SSV's and USV's must meet the technical specifications of API Spec 6A and 6AV1. All SSSVs must meet the technical specifications of API Specification 14A (as incorporated by...
Control of Technology Transfer at JPL
NASA Technical Reports Server (NTRS)
Oliver, Ronald
2006-01-01
Controlled Technology: 1) Design: preliminary or critical design data, schematics, technical flow charts, SNV code/diagnostics, logic flow diagrams, wirelist, ICDs, detailed specifications or requirements. 2) Development: constraints, computations, configurations, technical analyses, acceptance criteria, anomaly resolution, detailed test plans, detailed technical proposals. 3) Production: process or how-to: assemble, operated, repair, maintain, modify. 4) Manufacturing: technical instructions, specific parts, specific materials, specific qualities, specific processes, specific flow. 5) Operations: how-to operate, contingency or standard operating plans, Ops handbooks. 6) Repair: repair instructions, troubleshooting schemes, detailed schematics. 7) Test: specific procedures, data, analysis, detailed test plan and retest plans, detailed anomaly resolutions, detailed failure causes and corrective actions, troubleshooting, trended test data, flight readiness data. 8) Maintenance: maintenance schedules and plans, methods for regular upkeep, overhaul instructions. 9) Modification: modification instructions, upgrades kit parts, including software
10 CFR 72.26 - Contents of application: Technical specifications.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 2 2011-01-01 2011-01-01 false Contents of application: Technical specifications. 72.26 Section 72.26 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR THE INDEPENDENT STORAGE OF SPENT NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C...
10 CFR 72.26 - Contents of application: Technical specifications.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Contents of application: Technical specifications. 72.26 Section 72.26 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR THE INDEPENDENT STORAGE OF SPENT NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Giaddui, T; Chen, W; Yu, J
2014-06-15
Purpose: To review IGRT credentialing experience and unexpected technical issues encountered in connection with advanced radiotherapy technologies as implemented in RTOG clinical trials. To update IGRT credentialing procedures with the aim of improving the quality of the process, and to increase the proportion of IGRT credentialing compliance. To develop a living disease site-specific IGRT encyclopedia. Methods: Numerous technical issues were encountered during the IGRT credentialing process. The criteria used for credentialing review were based on: image quality; anatomy included in fused data sets and shift results. Credentialing requirements have been updated according to the AAPM task group reports for IGRTmore » to ensure that all required technical items are included in the quality review process. Implementation instructions have been updated and expanded for recent protocols. Results: Technical issues observed during the credentialing review process include, but are not limited to: poor quality images; inadequate image acquisition region; poor data quality; shifts larger than acceptable; no soft tissue surrogate. The updated IGRT credentialing process will address these issues and will also include the technical items required from AAPM: TG 104; TG 142 and TG 179 reports. An instruction manual has been developed describing a remote credentialing method for reviewers. Submission requirements are updated, including images/documents as well as facility questionnaire. The review report now includes summary of the review process and the parameters that reviewers check. We have reached consensus on the minimum IGRT technical requirement for a number of disease sites. RTOG 1311(NRG-BR002A Phase 1 Study of Stereotactic Body Radiotherapy (SBRT) for the Treatment of Multiple Metastases) is an example, here; the protocol specified the minimum requirement for each anatomical sites (with/without fiducials). Conclusion: Technical issues are identified and reported. IGRT guidelines are updated, with the corresponding credentialing requirements. An IGRT encyclopedia describing site-specific implementation issues is currently in development.« less
21 CFR 14.80 - Qualifications for members of standing policy and technical advisory committees.
Code of Federal Regulations, 2010 CFR
2010-04-01
..., and experience; specific technical expertise is not a requirement; (2) Are subject to the conflict of...), are subject to the conflict of interest laws and regulations either as special Government employees or... involved is not a requirement; and (ii) May be special Government employees subject to the conflict of...
Technical variables in high-throughput miRNA expression profiling: much work remains to be done.
Nelson, Peter T; Wang, Wang-Xia; Wilfred, Bernard R; Tang, Guiliang
2008-11-01
MicroRNA (miRNA) gene expression profiling has provided important insights into plant and animal biology. However, there has not been ample published work about pitfalls associated with technical parameters in miRNA gene expression profiling. One source of pertinent information about technical variables in gene expression profiling is the separate and more well-established literature regarding mRNA expression profiling. However, many aspects of miRNA biochemistry are unique. For example, the cellular processing and compartmentation of miRNAs, the differential stability of specific miRNAs, and aspects of global miRNA expression regulation require specific consideration. Additional possible sources of systematic bias in miRNA expression studies include the differential impact of pre-analytical variables, substrate specificity of nucleic acid processing enzymes used in labeling and amplification, and issues regarding new miRNA discovery and annotation. We conclude that greater focus on technical parameters is required to bolster the validity, reliability, and cultural credibility of miRNA gene expression profiling studies.
The role of non-technical skills in surgery
Agha, Riaz A.; Fowler, Alexander J.; Sevdalis, Nick
2015-01-01
Non-technical skills are of increasing importance in surgery and surgical training. A traditional focus on technical skills acquisition and competence is no longer enough for the delivery of a modern, safe surgical practice. This review discusses the importance of non-technical skills and the values that underpin successful modern surgical practice. This narrative review used a number of sources including written and online, there was no specific search strategy of defined databases. Modern surgical practice requires; technical and non-technical skills, evidence-based practice, an emphasis on lifelong learning, monitoring of outcomes and a supportive institutional and health service framework. Finally these requirements need to be combined with a number of personal and professional values including integrity, professionalism and compassionate, patient-centred care. PMID:26904193
ERIC Educational Resources Information Center
Hui, Sammy King Fai; Cheung, Hoi Yan
2015-01-01
Technical and vocational education and training (TVET) is often seen to be constraining and focused on specific skill development for specific occupations. This goal is at odds with the demands of a knowledge economy that requires more general educational outcomes for an uncertain and unpredictable labour market. For this reason, Hui (2012) has…
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
Pursuant to the Atomic Energy Act of 1954, as amended, and the Economy Act of 1932, the Department of Energy and its semi-autonomous National Nuclear Security Administration (NNSA) provide research and technical assistance to other Federal agencies on a reimbursable, full cost recovery basis through the Work for Others (WFO) program. For the vast majority of WFO technical projects, Department Federal officials furnish administrative project oversight while the actual detailed scientific or technical work is completed by the Department's 'management and operating' contractors. These contractors are awarded a special contract type specifically created under the Federal Acquisition Regulation to managemore » and operate Department sites and facilities, including sophisticated laboratories and technical centers, on a government-owned, contractor-operated basis. With annual expenditures exceeding $1 billion, the Department of Defense (DoD) is one of the Department's largest WFO customers. Work performed for DoD at the Department's national laboratories and other facilities includes highly technical research in areas such as nuclear weapons systems, counter-terrorism, and in-theater troop support. The National Defense Authorization Act for Fiscal Year (FY) 2009, required the Inspectors General of the DoD and the Department to review procurement methods to determine whether the Department complied with DoD procurement requirements and/or whether alternative procurement policies were in place. In response, we focused our review on projects performed by NNSA because it completes the vast majority (approximately $900 million in FY 2008) of the Department's work for DoD. As part of this effort, and, at the specific request of the DoD Office of Inspector General (DoD OIG), we identified the universe of WFO technical projects that received new funding in the fourth quarter of FY 2008 at NNSA sites. We independently reviewed a judgmental sample of 11 projects selected by the DoD OIG to meet the objectives of this audit. Our review revealed that NNSA managed DoD WFO technical projects in a manner consistent with requirements of the Atomic Energy Act of 1954, the Federal Acquisition Regulation, and the Department's implementing guidance, the Department of Energy Acquisition Regulation. Because of the very nature of the Department's management and operating contracting model, WFO projects may not be technically compliant with DoD procurement regulations in certain instances. We found that NNSA did not let new contracts or task orders for the DoD WFO technical projects we reviewed and instead managed them under its existing internal control process as part of its management and operating contract structure. In one instance, we noted that the Department had, at DoD's request, supplemented its control structure to incorporate specific DoD procurement requirements. Senior Department of Energy procurement officials acknowledged that neither the Department nor NNSA modified their existing prime contracts to incorporate specific defense procurement requirements because such modifications would be inappropriate, costly, and inefficient. In short, they informed us that the Department had developed and implemented a series of controls designed to monitor overall contractor performance, including WFO technical projects. Department and NNSA officials noted, however, that they were willing to incorporate DoD specific requirements into work orders should DoD request and fund such efforts. Additional details regarding management of WFO technical projects are discussed in the body of this report.« less
Brownfield to Brightfield Initiative in Oak Ridge, TN - 12346
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hough, Gil; Fairless, Chad
Experience characterizing, permitting, and restoring 'Brownfield' sites-government or industrial sites with restricted future use due to the presence or potential presence of hazardous substances, pollutants, or contaminants-is being leveraged to identify opportunities for redevelopment into solar power generating facilities which, in this context, are called 'Brightfields'. Brownfield sites offer the expansive land necessary for large photovoltaic (PV) solar farms, but require an in-depth working knowledge of complicated regulatory restrictions and environmental constraints to develop them. As a part of the effort to identify opportunities for redevelopment of Brownfield sites for solar applications, a technical guide, was composed specifically for themore » development of solar generation on restricted use sites. The basis of the technical guide gives specific consideration to environmental requirements and installation methods breaking that into three areas for assessing: 1) levels of contamination, 2) ground penetration requirements, and 3) the requirements for aesthetics and maintenance. Brightfield projects are underway to support the technical guide and expand re-industrialization efforts for the former DOE Gaseous Diffusion Plant in Oak Ridge, TN. There are exciting opportunities to turn Brownfields into Brightfield solar energy solutions for meeting the future renewable energy needs of our country. Brownfields that offer the large surface area required for solar PV farms coupled with the technical guide for the installation of solar farms on restricted use sites supports efforts to develop the solar capacities and expertise to tap this future market. The initial projects designed following the technical guide will provide verification of the installation requirements and beneficial reuse of restricted use sites. (authors)« less
The French Space Operation Act: Technical Regulations
NASA Astrophysics Data System (ADS)
Trinchero, J. P.; Lazare, B.
2010-09-01
The French Space Operation Act(FSOA) stipulates that a prime objective of the National technical regulations is to protect people, property, public health and the environment. Compliance with these technical regulations is mandatory as of 10 December 2010 for space operations by French space operators and for space operations from French territory. The space safety requirements and regulations governing procedures are based on national and international best practices and experience. A critical design review of the space system and procedures shall be carried out by the applicant, in order to verify compliance with the Technical Regulations. An independent technical assessment of the operation is delegated to CNES. The principles applied when drafting technical regulations are as follows: requirements must as far as possible establish the rules according to the objective to be obtained, rather than how it is to be achieved; requirements must give preference to international standards recognised as being the state of the art; requirements must take previous experience into account. Technical regulations are divided into three sections covering common requirements for the launch, control and return of a space object. A dedicated section will cover specific rules to be applied at the Guiana Space Centre. The main topics addressed by the technical regulations are: operator safety management system; study of risks to people, property, public health and the Earth’s environment; impact study on the outer space environment: space debris generated by the operation; planetary protection.
A Technical Overview and Description of SOFIA (Stratospheric Observatory for Infrared Astronomy)
NASA Technical Reports Server (NTRS)
Kunz, Nans
2003-01-01
This paper provides a technical overview of SOFIA, a unique airborne observatory, from an engineering perspective. It will do this by describing several of the systems of this observatory that are common with mountain top ground based observatories but mostly emphasize those more unique features and systems that are required to facilitate world class astronomy from a highly modified Boeing 747-SP flying at Mach 0.84 in the Stratosphere. This paper provides a technical overview of SOFIA by reviewing each of the performance specifications (the level one requirements for development) and describing some of the technical advancements for the telescope as well as the platform required to achieve these performance specifications. The technical advancements involved include mirror technologies, control system features, the telescope suspension system, and the aircraft open port cavity with associated cavity door that opens in flight and tracks the telescope elevation angle. For background this paper will provide a brief programmatic overview of the SOFIA project including the joint project arrangement between the US and Germany (NASA and DLR). Additionally, this paper will describe the up to date status of the development of SOFIA as the Observatory nears the date of the first test flight in the summer of 2004.
40 CFR 300.810 - Contents of the administrative record file.
Code of Federal Regulations, 2013 CFR
2013-07-01
... determination of imminent and substantial endangerment, public health evaluations, and technical and engineering... and appropriate requirements, guidance on risk/exposure assessments, engineering handbooks, articles from technical journals, memoranda on the application of a specific regulation to a site, and memoranda...
40 CFR 300.810 - Contents of the administrative record file.
Code of Federal Regulations, 2012 CFR
2012-07-01
... determination of imminent and substantial endangerment, public health evaluations, and technical and engineering... and appropriate requirements, guidance on risk/exposure assessments, engineering handbooks, articles from technical journals, memoranda on the application of a specific regulation to a site, and memoranda...
40 CFR 300.810 - Contents of the administrative record file.
Code of Federal Regulations, 2011 CFR
2011-07-01
... determination of imminent and substantial endangerment, public health evaluations, and technical and engineering... and appropriate requirements, guidance on risk/exposure assessments, engineering handbooks, articles from technical journals, memoranda on the application of a specific regulation to a site, and memoranda...
40 CFR 300.810 - Contents of the administrative record file.
Code of Federal Regulations, 2014 CFR
2014-07-01
... determination of imminent and substantial endangerment, public health evaluations, and technical and engineering... and appropriate requirements, guidance on risk/exposure assessments, engineering handbooks, articles from technical journals, memoranda on the application of a specific regulation to a site, and memoranda...
Code of Federal Regulations, 2011 CFR
2011-07-01
... specifications must include a clear and accurate description of the technical requirements and the qualitative... innovative technologies. (2) The recipient must avoid the use of detailed product specifications if at all...
Range Flight Safety Requirements
NASA Technical Reports Server (NTRS)
Loftin, Charles E.; Hudson, Sandra M.
2018-01-01
The purpose of this NASA Technical Standard is to provide the technical requirements for the NPR 8715.5, Range Flight Safety Program, in regards to protection of the public, the NASA workforce, and property as it pertains to risk analysis, Flight Safety Systems (FSS), and range flight operations. This standard is approved for use by NASA Headquarters and NASA Centers, including Component Facilities and Technical and Service Support Centers, and may be cited in contract, program, and other Agency documents as a technical requirement. This standard may also apply to the Jet Propulsion Laboratory or to other contractors, grant recipients, or parties to agreements to the extent specified or referenced in their contracts, grants, or agreements, when these organizations conduct or participate in missions that involve range flight operations as defined by NPR 8715.5.1.2.2 In this standard, all mandatory actions (i.e., requirements) are denoted by statements containing the term “shall.”1.3 TailoringTailoring of this standard for application to a specific program or project shall be formally documented as part of program or project requirements and approved by the responsible Technical Authority in accordance with NPR 8715.3, NASA General Safety Program Requirements.
Defining Requirements and Related Methods for Designing Sensorized Garments.
Andreoni, Giuseppe; Standoli, Carlo Emilio; Perego, Paolo
2016-05-26
Designing smart garments has strong interdisciplinary implications, specifically related to user and technical requirements, but also because of the very different applications they have: medicine, sport and fitness, lifestyle monitoring, workplace and job conditions analysis, etc. This paper aims to discuss some user, textile, and technical issues to be faced in sensorized clothes development. In relation to the user, the main requirements are anthropometric, gender-related, and aesthetical. In terms of these requirements, the user's age, the target application, and fashion trends cannot be ignored, because they determine the compliance with the wearable system. Regarding textile requirements, functional factors-also influencing user comfort-are elasticity and washability, while more technical properties are the stability of the chemical agents' effects for preserving the sensors' efficacy and reliability, and assuring the proper duration of the product for the complete life cycle. From the technical side, the physiological issues are the most important: skin conductance, tolerance, irritation, and the effect of sweat and perspiration are key factors for reliable sensing. Other technical features such as battery size and duration, and the form factor of the sensor collector, should be considered, as they affect aesthetical requirements, which have proven to be crucial, as well as comfort and wearability.
Metrology requirements for the serial production of ELT primary mirror segments
NASA Astrophysics Data System (ADS)
Rees, Paul C. T.; Gray, Caroline
2015-08-01
The manufacture of the next generation of large astronomical telescopes, the extremely large telescopes (ELT), requires the rapid manufacture of greater than 500 1.44m hexagonal segments for the primary mirror of each telescope. Both leading projects, the Thirty Meter Telescope (TMT) and the European Extremely Large Telescope (E-ELT), have set highly demanding technical requirements for each fabricated segment. These technical requirements, when combined with the anticipated construction schedule for each telescope, suggest that more than one optical fabricator will be involved in the delivery of the primary mirror segments in order to meet the project schedule. For one supplier, the technical specification is challenging and requires highly consistent control of metrology in close coordination with the polishing technologies used in order to optimize production rates. For production using multiple suppliers, however the supply chain is structured, consistent control of metrology along the supply chain will be required. This requires a broader pattern of independent verification than is the case of a single supplier. This paper outlines the metrology requirements for a single supplier throughout all stages of the fabrication process. We identify and outline those areas where metrology accuracy and duration have a significant impact on production efficiency. We use the challenging ESO E-ELT technical specification as an example of our treatment, including actual process data. We further develop this model for the case of a supply chain consisting of multiple suppliers. Here, we emphasize the need to control metrology throughout the supply chain in order to optimize net production efficiency.
Technical aspects of contrast-enhanced ultrasound (CEUS) examinations: tips and tricks.
Greis, C
2014-01-01
Ultrasound contrast agents have substantially extended the clinical value of ultrasound, allowing the assessment of blood flow and distribution in real-time down to microcapillary level. Selective imaging of contrast agent signals requires a contrast-specific imaging mode on the ultrasound scanner, allowing real-time separation of tissue and contrast agent signals. The creation of a contrast image requires a specific interaction between the insonated ultrasound wave and the contrast agent microbubbles, leading to persistent oscillation of the bubbles. Several technical and procedural parameters have a significant influence on the quality of CEUS images and should be controlled carefully to obtain good image quality and a reliable diagnosis. Achieving the proper balance between the respective parameters is a matter of technical knowledge and experience. Appropriate training and education should be mandatory for every investigator performing CEUS examinations.
Code of Federal Regulations, 2013 CFR
2013-10-01
... full and open competition, such as: (i) Explanation of why technical data packages, specifications... the estimate was derived. (iii) When 6.302-2 is cited, data, estimated cost, or other rationale as to... shall include evidence that any supporting data that is the responsibility of technical or requirements...
Code of Federal Regulations, 2014 CFR
2014-10-01
... full and open competition, such as: (i) Explanation of why technical data packages, specifications... the estimate was derived. (iii) When 6.302-2 is cited, data, estimated cost, or other rationale as to... shall include evidence that any supporting data that is the responsibility of technical or requirements...
Buttner, William; Rivkin, C.; Burgess, R.; ...
2017-02-04
Here, the United Nations Economic Commission for Europe Global Technical Regulation (GTR) Number 13 ( Global Technical Regulation on Hydrogen and Fuel Cell Vehicles) is the defining document regulating safety requirements in hydrogen vehicles, and in particular, fuel cell electric vehicles (FCEVs). GTR Number 13 has been formally adopted and will serve as the basis for the national regulatory standards for FCEV safety in North America (led by the United States), Japan, Korea, and the European Union. The GTR defines safety requirements for these vehicles, including specifications on the allowable hydrogen levels in vehicle enclosures during in-use and post-crash conditionsmore » and on the allowable hydrogen emissions levels in vehicle exhaust during certain modes of normal operation. However, in order to be incorporated into national regulations, that is, to be legally binding, methods to verify compliance with the specific requirements must exist. In a collaborative program, the Sensor Laboratories at the National Renewable Energy Laboratory in the United States and the Joint Research Centre, Institute for Energy and Transport in the Netherlands have been evaluating and developing analytical methods that can be used to verify compliance with the hydrogen release requirements as specified in the GTR.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Deshpande, Alina
2015-03-12
This document describes the usability requirements for the Biosurveillance resource directory (BRD); that is, who will be using the tool and what tasks they will be using it for. It does not include information on technical implementation (e.g., whether specific information is contained in the database or pulled on demand from other sources). It also avoids specific design ideas (such as widget descriptions) unless they are necessary to illustrate a requirement.
Unique technical innovations for short rotation woody crops research and development
Adam H. Wiese; Ronald S., Jr. Zalesny
2006-01-01
Often technology that is available to conduct short rotation woody crops (SRWC) research is too expensive, difficult to operate, cumbersome, and/or impractical for meeting sample size requirements. Thus, we have designed, constructed, and tested technical innovations that have allowed us to meet our specific experimental needs.
Interdisciplinary Instructional Reading Strategies: An Applied Application for Business Education
ERIC Educational Resources Information Center
Polkinghorne, Frederick W.; Bland, Zinna L.
2011-01-01
The contemporary workforce requires technical and reading skills (Shanahan & Shanahan, 2008; The Conference Board, Corporate Voices for Working Families, Partnership for 21st Century Skills, Society of Human Resource Management, 2006). Technical skills allow workers to perform specific workforce tasks, while reading skills are generally needed by…
NASA Astrophysics Data System (ADS)
1990-10-01
The current magnetohydrodynamic MHD program being implemented is a result of a consensus established in public meetings held by the Department of Energy in 1984. The public meetings were followed by the formulation of a June 1984 Coal-Fired MHD Preliminary Transition and Program Plan. This plan focused on demonstrating the proof-of-concept (POC) of coal-fired MHD electric power plants by the early 1990s. MHD test data indicate that while there are no fundamental technical barriers impeding the development of MHD power plants, technical risk remains. To reduce the technical risk three key subsystems (topping cycle, bottoming cycle, and seed regeneration) are being assembled and tested separately. The program does not require fabrication of a complete superconducting magnet, but rather the development and testing of superconductor cables. The topping cycle system test objectives can be achieved using a conventional iron core magnet system already in place at a DOE facility. Systems engineering-derived requirements and analytical modeling to support scale-up and component design guide the program. In response to environmental, economic, engineering, and utility acceptance requirements, design choices and operating modes are tested and refined to provide technical specifications for meeting commercial criteria. These engineering activities are supported by comprehensive and continuing systems analyses to establish realistic technical requirements and cost data. Essential elements of the current program are to: develop technical and environmental data for the integrated MHD topping cycle and bottoming cycle systems through POC testing (1000 and 4000 hours, respectively); design, construct, and operate a POC seed regeneration system capable of processing spent seed materials from the MHD bottoming cycle; prepare conceptual designs for a site specific MHD retrofit plant; and continue supporting research necessary for system testing.
Minimally Invasive Implantable Fetal Micropacemaker: Mechanical Testing and Technical Refinements
Zhou, Li; Vest, Adriana N.; Peck, Raymond A.; Sredl, Jonathan P.; Huang, Xuechen; Bar-Cohen, Yaniv; Silka, Michael J.; Pruetz, Jay D.; Chmait, Ramen H.; Loeb, Gerald E.
2016-01-01
This paper discusses the technical and safety requirements for cardiac pacing of a human fetus with heart failure and hydrops fetalis secondary to complete heart block. Engineering strategies to meet specific technical requirements were integrated into a systematic design and implementation consisting of a novel fetal micropacemaker, a percutaneous implantation system, and a sterile package that enables device storage and recharging maintenance in a clinical setting. We further analyzed observed problems on myocardial fixation and pacing lead fatigue previously reported in earlier preclinical trials. This paper describes the technical refinements of the implantable fetal micropacemaker to overcome these challenges. The mechanical performance has been extensively tested to verify the improvement of reliability and safety margins of the implantation system. PMID:27021067
Johnson Space Center Health and Medical Technical Authority
NASA Technical Reports Server (NTRS)
Fogarty, Jennifer A.
2010-01-01
1.HMTA responsibilities: a) Assure program/project compliance with Agency health and medical requirements at identified key decision points. b) Certify that programs/projects comply with Agency health and medical requirements prior to spaceflight missions. c) Assure technical excellence. 2. Designation of applicable NASA Centers for HMTA implementation and Chief Medical Officer (CMO) appointment. 3. Center CMO responsible for HMTA implementation for programs and projects at the center. JSC HMTA captured in "JSC HMTA Implementation Plan". 4. Establishes specifics of dissenting opinion process consistent with NASA procedural requirements.
Dowel Bar Retrofit Mix Design and Specification : Technical Report
DOT National Transportation Integrated Search
2012-01-01
Current INDOT specifications for repair materials to be used in dowel bar retrofit (DBR) applications (Sections 507.08 and 901.07 of INDOTs Book of Specifications) are based, in large part, on the requirements of ASTM C 928 and the manufacturer-pr...
NASA Astrophysics Data System (ADS)
Chan, Y. David; Rastegar, Abbas; Yun, Henry; Putna, E. Steve; Wurm, Stefan
2010-04-01
Reducing mask blank and patterned mask defects is the number one challenge for extreme ultraviolet lithography. If the industry succeeds in reducing mask blank defects at the required rate of 10X every year for the next 2-3 years to meet high volume manufacturing defect requirements, new inspection and review tool capabilities will soon be needed to support this goal. This paper outlines the defect inspection and review tool technical requirements and suggests development plans to achieve pilot line readiness in 2011/12 and high volume manufacturing readiness in 2013. The technical specifications, tooling scenarios, and development plans were produced by a SEMATECH-led technical working group with broad industry participation from material suppliers, tool suppliers, mask houses, integrated device manufacturers, and consortia. The paper summarizes this technical working group's assessment of existing blank and mask inspection/review infrastructure capabilities to support pilot line introduction and outlines infrastructure development requirements and tooling strategies to support high volume manufacturing.
Defining Requirements and Related Methods for Designing Sensorized Garments
Andreoni, Giuseppe; Standoli, Carlo Emilio; Perego, Paolo
2016-01-01
Designing smart garments has strong interdisciplinary implications, specifically related to user and technical requirements, but also because of the very different applications they have: medicine, sport and fitness, lifestyle monitoring, workplace and job conditions analysis, etc. This paper aims to discuss some user, textile, and technical issues to be faced in sensorized clothes development. In relation to the user, the main requirements are anthropometric, gender-related, and aesthetical. In terms of these requirements, the user’s age, the target application, and fashion trends cannot be ignored, because they determine the compliance with the wearable system. Regarding textile requirements, functional factors—also influencing user comfort—are elasticity and washability, while more technical properties are the stability of the chemical agents’ effects for preserving the sensors’ efficacy and reliability, and assuring the proper duration of the product for the complete life cycle. From the technical side, the physiological issues are the most important: skin conductance, tolerance, irritation, and the effect of sweat and perspiration are key factors for reliable sensing. Other technical features such as battery size and duration, and the form factor of the sensor collector, should be considered, as they affect aesthetical requirements, which have proven to be crucial, as well as comfort and wearability. PMID:27240361
Transit safety retrofit package development : architecture and design specifications.
DOT National Transportation Integrated Search
2014-05-01
The Architecture and Design Specifications capture the TRP system architecture and design that fulfills the technical objectives stated in the TRP requirements document. The document begins with an architectural overview that identifies and describes...
Kraft, Marc
2008-09-03
Testing and restoring technical-functional safety is an essential part of medical device reprocessing. Technical functional tests have to be carried out on the medical device in the course of the validation of reprocessing procedures. These ensure (in addition to the hygiene tests) that the reprocessing procedure is suitable for the medical device. Functional tests are, however, also a part of reprocessing procedures. As a stage in the reprocessing, they ensure for the individual medical device that no damage or other changes limit the performance. When determining which technical-functional tests are to be carried out, the current technological standard has to be taken into account in the form of product-specific and process-oriented norms. Product-specific norms primarily define safety-relevant requirements. The risk management method described in DIN EN ISO 14971 is the basis for recognising hazards; the likelihood of such hazards arising can be minimised through additional technical-functional tests, which may not yet have been standardised. Risk management is part of a quality management system, which must be bindingly certified for manufacturers and processors of critical medical devices with particularly high processing demands by a body accredited by the competent authority.
Kraft, Marc
2008-01-01
Testing and restoring technical-functional safety is an essential part of medical device reprocessing. Technical functional tests have to be carried out on the medical device in the course of the validation of reprocessing procedures. These ensure (in addition to the hygiene tests) that the reprocessing procedure is suitable for the medical device. Functional tests are, however, also a part of reprocessing procedures. As a stage in the reprocessing, they ensure for the individual medical device that no damage or other changes limit the performance. When determining which technical-functional tests are to be carried out, the current technological standard has to be taken into account in the form of product-specific and process-oriented norms. Product-specific norms primarily define safety-relevant requirements. The risk management method described in DIN EN ISO 14971 is the basis for recognising hazards; the likelihood of such hazards arising can be minimised through additional technical-functional tests, which may not yet have been standardised. Risk management is part of a quality management system, which must be bindingly certified for manufacturers and processors of critical medical devices with particularly high processing demands by a body accredited by the competent authority. PMID:20204095
The Importance of Information Requirements in Designing Acquisition to Information Systems
NASA Technical Reports Server (NTRS)
Davis, Bruce A.; Hill, Chuck; Maughan, Paul M.
1998-01-01
The partnership model used by NASA's Commercial Remote Sensing Program has been successful in better defining remote sensing functional requirements and translation to technical specifications to address environmental needs of the 21st century.
Geostatistics as a tool to define various categories of resources
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sabourin, R.
1983-02-01
Definition of 'measured' and 'indicated' resources tend to be vague. Yet, the calculation of such categories of resources in a mineral deposit calls for specific technical criteria. The author discusses how a geostatistical methodology provides the technical criteria required to classify reasonably assured resources by levels of assurance of their existence.
[Operation/Maintenance of Fiber Placement Machine
NASA Technical Reports Server (NTRS)
Pelham, L.; Dillard, T.
2000-01-01
NASA contract NAS8-39749 was completed in January 2000. The contract period of performance covered six (6) years and included basic program technical support as required by NASA with up to thirty (30) different technical directives identified and issued by NASA for specific Advanced Composite Technology tasks during the course of the contract.
OSH technical reference manual
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-11-01
In an evaluation of the Department of Energy (DOE) Occupational Safety and Health programs for government-owned contractor-operated (GOCO) activities, the Department of Labor`s Occupational Safety and Health Administration (OSHA) recommended a technical information exchange program. The intent was to share written safety and health programs, plans, training manuals, and materials within the entire DOE community. The OSH Technical Reference (OTR) helps support the secretary`s response to the OSHA finding by providing a one-stop resource and referral for technical information that relates to safe operations and practice. It also serves as a technical information exchange tool to reference DOE-wide materials pertinentmore » to specific safety topics and, with some modification, as a training aid. The OTR bridges the gap between general safety documents and very specific requirements documents. It is tailored to the DOE community and incorporates DOE field experience.« less
47 CFR 73.53 - Requirements for authorization of antenna monitors.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 47 Telecommunication 4 2014-10-01 2014-10-01 false Requirements for authorization of antenna... antenna monitors. (a) Antenna monitors shall be verified for compliance with the technical requirements in...) An antenna monitor shall meet the following specifications: (1) The monitor shall be designed to...
47 CFR 73.53 - Requirements for authorization of antenna monitors.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 4 2011-10-01 2011-10-01 false Requirements for authorization of antenna... antenna monitors. (a) Antenna monitors shall be verified for compliance with the technical requirements in...) An antenna monitor shall meet the following specifications: (1) The monitor shall be designed to...
47 CFR 73.53 - Requirements for authorization of antenna monitors.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 47 Telecommunication 4 2012-10-01 2012-10-01 false Requirements for authorization of antenna... antenna monitors. (a) Antenna monitors shall be verified for compliance with the technical requirements in...) An antenna monitor shall meet the following specifications: (1) The monitor shall be designed to...
47 CFR 73.53 - Requirements for authorization of antenna monitors.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 4 2010-10-01 2010-10-01 false Requirements for authorization of antenna... antenna monitors. (a) Antenna monitors shall be verified for compliance with the technical requirements in...) An antenna monitor shall meet the following specifications: (1) The monitor shall be designed to...
47 CFR 73.53 - Requirements for authorization of antenna monitors.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 47 Telecommunication 4 2013-10-01 2013-10-01 false Requirements for authorization of antenna... antenna monitors. (a) Antenna monitors shall be verified for compliance with the technical requirements in...) An antenna monitor shall meet the following specifications: (1) The monitor shall be designed to...
DOE standard: The Department of Energy Laboratory Accreditation Program for radiobioassay
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1998-12-01
This technical standard describes the US Department of Energy Laboratory Accreditation Program (DOELAP) for Radiobioassay, for use by the US Department of Energy (DOE) and DOE Contractor radiobioassay programs. This standard is intended to be used in conjunction with the general administrative technical standard that describes the overall DOELAP accreditation process--DOE-STD-1111-98, Department of Energy Laboratory Accreditation Program Administration. This technical standard pertains to radiobioassay service laboratories that provide either direct or indirect (in vivo or in vitro) radiobioassay measurements in support of internal dosimetry programs at DOE facilities or for DOE and DOE contractors. Similar technical standards have been developedmore » for other DOELAP dosimetry programs. This program consists of providing an accreditation to DOE radiobioassay programs based on successful completion of a performance-testing process and an on-site evaluation by technical experts. This standard describes the technical requirements and processes specific to the DOELAP Radiobioassay Accreditation Program as required by 10 CFR 835 and as specified generically in DOE-STD-1111-98.« less
NASA Technical Reports Server (NTRS)
1973-01-01
A specification catalog to define the equipment to be used for conducting life sciences experiments in a space laboratory is presented. The specification sheets list the purpose of the equipment item, and any specific technical requirements which can be identified. The status of similar hardware for ground use is stated with comments regarding modifications required to achieve spaceflight qualified hardware. Pertinent sketches, commercial catalog sheets, or drawings of the applicable equipment are included.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-17
... Specifications (STS) to define a new time limit for restoring inoperable RCS leakage detection instrumentation to... operability of the RCS leakage detection instrumentation. The CLIIP model SE will facilitate expedited... Operability Requirements and Actions for RCS Leakage Instrumentation'' AGENCY: Nuclear Regulatory Commission...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-13
... assure that the emergency diesel generator's diesel driven cooling water pumps perform their required... generators will provide required electrical power as assumed in the accident analyses and the cooling water... Technical Specifications to require an adequate emergency diesel generator and diesel driven cooling water...
NASA Technical Reports Server (NTRS)
1976-01-01
Contractural requirements, project planning, equipment specifications, and technical data for space shuttle biological experiment payloads are presented. Topics discussed are: (1) urine collection and processing on the space shuttle, (2) space processing of biochemical and biomedical materials, (3) mission simulations, and (4) biomedical equipment.
ERIC Educational Resources Information Center
Tafesse, Fikru; Mphahlele, Malose J.
2018-01-01
Discipline-specific knowledge and associated technical skills as well as generic skills have represented distinct and separate aspects of chemical sciences in university studies (linear training). In addition to technical skills gained through laboratory training, employers now require a soft skill set such as strengths in analytical thinking,…
ERIC Educational Resources Information Center
Averitt, Sallie D.
These three modules, which were developed for use by instructors in a manufacturing firm's advanced technical preparation program, contain the materials required to present the safety section of the plant's adult-oriented, job-specific competency-based training program. The 3 modules contain 12 lessons on the following topics: lockout/tagout…
45 CFR 164.530 - Administrative requirements.
Code of Federal Regulations, 2012 CFR
2012-10-01
... workforce on the policies and procedures with respect to protected health information required by this... administrative, technical, and physical safeguards to protect the privacy of protected health information. (2)(i) Implementation specification: Safeguards. A covered entity must reasonably safeguard protected health information...
45 CFR 164.530 - Administrative requirements.
Code of Federal Regulations, 2013 CFR
2013-10-01
... workforce on the policies and procedures with respect to protected health information required by this... administrative, technical, and physical safeguards to protect the privacy of protected health information. (2)(i) Implementation specification: Safeguards. A covered entity must reasonably safeguard protected health information...
software development of next-generation whole-building energy modeling, analysis, and simulation tools technical positions in networking protocol specifications, call control software, and requirements
1984-02-01
and is approved for publication. APPROVED: ’"" " Project Engineer APPROVED:k 1 4 RAYMOND P. URTZ, JR. Acting Technical Director Command and Control ...Technical Director Command and Control Division FOR THE COMMANDER: JOHN A. RITZ Acting Chief, Plans Office If your address has changed or if you wish to be...179 55812203 Denver CO 80201 55812203 I. CONTROLLING OFFICE NAME AND ADDRESS 12. REPORT DATE Rome Air Development Center (COEE) February 1984 Griffiss
Lightning Protection Guidelines for Aerospace Vehicles
NASA Technical Reports Server (NTRS)
Goodloe, C. C.
1999-01-01
This technical memorandum provides lightning protection engineering guidelines and technical procedures used by the George C. Marshall Space Flight Center (MSFC) Electromagnetics and Aerospace Environments Branch for aerospace vehicles. The overviews illustrate the technical support available to project managers, chief engineers, and design engineers to ensure that aerospace vehicles managed by MSFC are adequately protected from direct and indirect effects of lightning. Generic descriptions of the lightning environment and vehicle protection technical processes are presented. More specific aerospace vehicle requirements for lightning protection design, performance, and interface characteristics are available upon request to the MSFC Electromagnetics and Aerospace Environments Branch, mail code EL23.
Work, Leisure Time and Adult Education in Technically Advanced Industrial Countries.
ERIC Educational Resources Information Center
European Centre for Leisure and Education, Prague (Czechoslovakia).
An outline of the increasing amount of change required of modern man, specifically in Czechoslovakia, to cope with the demands of a rapidly advancing technology is presented. Consideration is given to leisure time, work requirements, and educational needs. (CK)
Code of Federal Regulations, 2011 CFR
2011-01-01
... COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE General Provisions § 61.7 Concepts. (a) The disposal facility. (1) Part 61 is intended to apply to land disposal of... specific technical requirements for near-surface disposal of radioactive waste, a subset of land disposal...
Code of Federal Regulations, 2012 CFR
2012-01-01
... COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE General Provisions § 61.7 Concepts. (a) The disposal facility. (1) Part 61 is intended to apply to land disposal of... specific technical requirements for near-surface disposal of radioactive waste, a subset of land disposal...
Code of Federal Regulations, 2010 CFR
2010-01-01
... COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE General Provisions § 61.7 Concepts. (a) The disposal facility. (1) Part 61 is intended to apply to land disposal of... specific technical requirements for near-surface disposal of radioactive waste, a subset of land disposal...
Code of Federal Regulations, 2013 CFR
2013-01-01
... COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE General Provisions § 61.7 Concepts. (a) The disposal facility. (1) Part 61 is intended to apply to land disposal of... specific technical requirements for near-surface disposal of radioactive waste, a subset of land disposal...
Code of Federal Regulations, 2014 CFR
2014-01-01
... COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE General Provisions § 61.7 Concepts. (a) The disposal facility. (1) Part 61 is intended to apply to land disposal of... specific technical requirements for near-surface disposal of radioactive waste, a subset of land disposal...
45 CFR 164.312 - Technical safeguards.
Code of Federal Regulations, 2012 CFR
2012-10-01
... REQUIREMENTS SECURITY AND PRIVACY Security Standards for the Protection of Electronic Protected Health... that maintain electronic protected health information to allow access only to those persons or software... specifications: (i) Unique user identification (Required). Assign a unique name and/or number for identifying and...
Aid in a city at war: the case of Mogadishu, Somalia.
Grünewald, François
2012-07-01
Mogadishu, the capital of Somalia, has been central to life, war, and peace in the country for almost two decades. Its urban characteristics, though, have been put to one side for the most part. In recent years, Mogadishu-related issues have been merged mostly into a global agenda for South and Central Somalia, resulting in the technical and coordination approaches employed in the city largely being reproductions of solutions utilised in refugee camps and rural areas. Unfortunately, urban problems require urban solutions. The aid system is just starting to discover how specific aid in cities at war should be, both from an organisational and a technical standpoint. The enhancement of aid practices in an urban setting implies, among other things, a more strategic approach to the specific spatial characteristics of the city, a more fine-tuned analysis of the technical requirements of the urban service delivery systems, and a better understanding of the role of urban institutions. © 2012 The Author(s). Journal compilation © Overseas Development Institute, 2012.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-03
... Specifications (STS) to define a new time limit for restoring inoperable RCS leakage detection instrumentation to... operability of the RCS leakage detection instrumentation. The CLIIP model SE will facilitate expedited... Operability Requirements and Actions for RCS Leakage Instrumentation'' AGENCY: U.S. Nuclear Regulatory...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-13
... requirements: (1) An independent auditor, who has appropriate technical training and proficiency with Title I of ERISA, shall conduct an annual written audit; (2) The audit shall specifically require the auditor... and written policies and procedures requirements described in paragraph (f); (4) The auditor shall...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-08
... requirements of the 2008 edition of the National Institute of Standards and Technology (NIST) Handbook 44, ``Specifications, Tolerances, and Other Technical Requirements for Weighing and Measuring Devices,'' (NIST Handbook... identified as ``NIST Handbook 44 IBF Comments,'' making reference to the date and page number of this issue...
Configuration management program plan for Hanford site systems engineering
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kellie, C.L.
This plan establishes the integrated management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford Site Technical Baseline.
75 FR 48743 - Mandatory Reporting of Greenhouse Gases
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-11
...EPA is proposing to amend specific provisions in the GHG reporting rule to clarify certain provisions, to correct technical and editorial errors, and to address certain questions and issues that have arisen since promulgation. These proposed changes include providing additional information and clarity on existing requirements, allowing greater flexibility or simplified calculation methods for certain sources in a facility, amending data reporting requirements to provide additional clarity on when different types of GHG emissions need to be calculated and reported, clarifying terms and definitions in certain equations, and technical corrections.
75 FR 79091 - Mandatory Reporting of Greenhouse Gases
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-17
...EPA is amending specific provisions in the greenhouse gas reporting rule to clarify certain provisions, to correct technical and editorial errors, and to address certain questions and issues that have arisen since promulgation. These final changes include generally providing additional information and clarity on existing requirements, allowing greater flexibility or simplified calculation methods for certain sources, amending data reporting requirements to provide additional clarity on when different types of greenhouse gas emissions need to be calculated and reported, clarifying terms and definitions in certain equations and other technical corrections and amendments.
Space education: Deriving benefits from industrial consortia
NASA Technical Reports Server (NTRS)
Stone, Barbara A.; Page, John R.
1993-01-01
As the number of spacefaring nations of the world increases, so does the difficulty of competing in a global economy. The development of high technology products and services for space programs, and the economic exploitation of these technologies for national economic growth, requires professionals versed in both technical and commercial aspects of space. Meeting this requirement academically presents two challenges. On the technical side, enrollment in science and engineering is decreasing in some of the spacefaring nations. From the commerce perspective, very few colleges and universities offer specific courses in space business.
45 CFR 164.312 - Technical safeguards.
Code of Federal Regulations, 2013 CFR
2013-10-01
... REQUIREMENTS SECURITY AND PRIVACY Security Standards for the Protection of Electronic Protected Health... persons or software programs that have been granted access rights as specified in § 164.308(a)(4). (2) Implementation specifications: (i) Unique user identification (Required). Assign a unique name and/or number for...
Ohno, Yasuo
2002-01-01
An overview of the International Conference on Harmonization of Technical Requirements for Registration of Pharmaceuticals for Human Use (ICH) is described. ICH was established through cooperation of the regulatory agencies and industrial parties of three main regions involved in pharmaceuticals: the European Union, the United States, and Japan. The purpose of the ICH is to make recommendations to achieve greater harmonization regarding interpretation and application of technical guidelines and requirements for product registration in an effort to reduce or obviate the need to duplicate the testing carried out during the research and development of new medicines. The main purpose of ICH was not to foster the 3Rs per se; however, harmonization of guidelines has eliminated duplications of similar tests to satisfy the specific requirements of each region. The ICH process has contributed to mutual understanding of the regulatory requirements and has decreased the number of unnecessary animal experiments. Specific examples of the contributions of ICH harmonization to the 3Rs are described.
NASA software documentation standard software engineering program
NASA Technical Reports Server (NTRS)
1991-01-01
The NASA Software Documentation Standard (hereinafter referred to as Standard) can be applied to the documentation of all NASA software. This Standard is limited to documentation format and content requirements. It does not mandate specific management, engineering, or assurance standards or techniques. This Standard defines the format and content of documentation for software acquisition, development, and sustaining engineering. Format requirements address where information shall be recorded and content requirements address what information shall be recorded. This Standard provides a framework to allow consistency of documentation across NASA and visibility into the completeness of project documentation. This basic framework consists of four major sections (or volumes). The Management Plan contains all planning and business aspects of a software project, including engineering and assurance planning. The Product Specification contains all technical engineering information, including software requirements and design. The Assurance and Test Procedures contains all technical assurance information, including Test, Quality Assurance (QA), and Verification and Validation (V&V). The Management, Engineering, and Assurance Reports is the library and/or listing of all project reports.
NASA Technical Reports Server (NTRS)
Anchondo, Ian; Campbell, Colin
2017-01-01
The FSA with Integrated Aux FSA Specification establishes the requirements for design, performance, and testing of the FSA-431/FSA-531 assembly in compliance with CTSD-ADV-780, Development Specification for the Advanced EMU (AEMU) Portable Life Support System (PLSS). This section contains the technical design and performance requirements for the integrated assembly of the Feedwater Supply Assembly and Auxiliary Feedwater Supply Assembly for the Advanced EVA Development Portable Life Support Subsystem (PLSS).
Management of optics. [for HEAO-2 X ray telescope
NASA Technical Reports Server (NTRS)
Kirchner, T. E.; Russell, M.
1981-01-01
American Science and Engineering, Inc., designed the large X-ray optic for the HEAO-2 X-ray Telescope. The key element in this project was the High Resolution Mirror Assembly (HRMA), subcontracting the fabrication of the optical surfaces and their assembly and alignment. The roles and organization of the key participants in the creation of HRMA are defined, and the degree of interaction between the groups is described. Management of this effort was extremely complex because of the intricate weaving of responsibilities, and AS&E, as HEAO-2 Program managers, needed to be well versed in the scientific objectives, the technical requirements, the program requirements, and the subcontract management. Understanding these factors was essential for implementing both technical and management controls, such as schedule and budget constraints, in-process control, residence requirements, and scientist review and feedback. Despite unforeseen technical problems and interaction differences, the HEAO-2 was built on schedule and to specification.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-24
... required without notice and comment a pilot serving as a second in command in part 135 commuter operations to have an airline transport pilot certificate and an aircraft type rating, and a pilot in command in... pilot certificate requirements for a second in command (SIC) in part 121 operations. Specifically, Sec...
Educational Furniture for the 16-19 Age Group: Specification and Design. Design Note 30.
ERIC Educational Resources Information Center
Furniture Industry Research Association, Stevenage (England).
A 1982 British study examined the furniture needs of 16-19 year-old students. This report presented the findings on the technical and performance requirements in terms of durability and ergonomics. This report examines the furniture requirements in teaching spaces, social, refreshment and private study areas, storage requirements for pupils'…
EVA tools and equipment reference book
NASA Technical Reports Server (NTRS)
Fullerton, R. K.
1993-01-01
This document contains a mixture of tools and equipment used throughout the space shuttle-based extravehicular activity (EVA) program. Promising items which have reached the prototype stage of development are also included, but should not be considered certified ready for flight. Each item is described with a photo, a written discussion, technical specifications, dimensional drawings, and points of contact for additional information. Numbers on the upper left-hand corner of each photo may be used to order specific pictures from NASA and contractor photo libraries. Points of contact were classified as either operational or technical. An operational contact is an engineer from JSC Mission Operations Directorate who is familiar with the basic function and on-orbit use of the tool. A technical contact would be the best source of detailed technical specifications and is typically the NASA subsystem manager. The technical information table for each item uses the following terms to describe the availability or status of each hardware item: Standard - Flown on every mission as standard manifest; Flight specific - Potentially available for flight, not flown every mission (flight certification cannot be guaranteed and recertification may be required); Reference only - Item no longer in active inventory or not recommended for future use, some items may be too application-specific for general use; and Developmental - In the prototype stage only and not yet available for flight. The current availability and certification of any flight-specific tool should be verified with the technical point of contact. Those tools built and fit checked for Hubble Space Telescope maintenance are program dedicated and are not available to other customers. Other customers may have identical tools built from the existing, already certified designs as an optional service.
Configuration management program plan for Hanford site systems engineering
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hoffman, A.G.
This plan establishes the integrated configuration management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford site technical baseline.
A Study of Placing Army Requirements on Contract
2016-04-01
perhaps being unable to control the external environment, has management authority over business and technical aspects of a specific program. The PM...research is the last element of the planning phase addressing both business and technical considerations. The acquisition team equips themselves with...report is the final product utilizing documented findings and supports the business strategy (DoD, Guidebook for the Acquisition of Services, 2011
48 CFR 2901.603-71 - Contracting Officer's Technical Representatives (COTR).
Code of Federal Regulations, 2010 CFR
2010-10-01
... maintained by the COTR; (5) Reference to meeting applicable requirements for ethics, procurement integrity... training specifically in procurement ethics, either through courses offered periodically by the Department...
7 CFR 801.12 - Design requirements incorporated by reference.
Code of Federal Regulations, 2010 CFR
2010-01-01
... reference: General Code (1.10.) G-S.5.5. Money Values, Mathematical Agreement G-T.1. Acceptance Tolerances G.... Tolerance Values T.3. For Test Weight Per Bushel Indications or Recorded Representations UR.3.2. Other... Standards and Technology's (NIST) Handbook 44, “Specifications, Tolerances, and Other Technical Requirements...
State Competencies for Writing: Grades K-6. Technical Note.
ERIC Educational Resources Information Center
Lawlor, Joseph
This paper contains descriptions of mandated minimum competency documents from seven states: Florida, Georgia, Louisiana, Michigan, Oklahoma, Tennessee, and Texas. Each description provides a picture of the general nature of the state requirements and a discussion of the specific writing skills requirements. The procedures used to compile a…
Military display market segment: avionics (Invited Paper)
NASA Astrophysics Data System (ADS)
Desjardins, Daniel D.; Hopper, Darrel G.
2005-05-01
The military display market is analyzed in terms of one of its segments: avionics. Requirements are summarized for 13 technology-driving parameters for direct-view and virtual-view displays in cockpits and cabins. Technical specifications are discussed for selected programs. Avionics stresses available technology and usually requires custom display designs.
Preliminary design specifications of a calcium model
NASA Technical Reports Server (NTRS)
1978-01-01
A list of objectives, requirements, and guidelines are given for a calcium model. Existing models are reviewed and evaluated in relation to the stated objectives and requirements. The reviewed models were either too abstract or apparently invalidated. A technical approach to the design of a desirable model is identified.
Phytotechnology Technical and Regulatory Guidance and Decision Trees, Revised
2009-02-01
upon planting . In other cases, it may require several seasons before the plant can interact with a contaminated zone at depth. Furthermore, it may...potential ecological exposures posed by the species planted need to be considered. The level of detail required is site specific and varies with the...to be assessed as well. However, the ecological exposure may not be directly from the consumption of the plant . Specifically, the U.S. Environmental
Comparison and selection of off-grid PV systems
NASA Astrophysics Data System (ADS)
Izmailov, Andrey Yu.; Lobachevsky, Yakov P.; Shepovalova, Olga V.
2018-05-01
This work deals with comparison, evaluation and selection of PV systems of the same type based on their technical parameters either indicated in their technical specifications or calculated ones. Stand-alone and grid backed up photoelectric systems have been considered. General requirements for photoelectric system selection and evaluation have been presented that ensure system operability and required efficiency in operation conditions. Generic principles and definition of photoelectric systems characteristics have been considered. The described method is mainly targeted at PV engineering personnel and private customers purchasing PV systems. It can be also applied in the course of project contests, tenders, etc.
Ferguson, Morag; Shin, Jinho; Knezevic, Ivana; Minor, Philip; Barrett, Alan
2010-12-06
In May 2009, WHO convened a meeting of Working Group on Technical Specifications for Manufacturing and Evaluating Yellow Fever (YF) Vaccines, Geneva, Switzerland to initiate revision of the WHO Recommendations (formerly, Requirements) for YF vaccine published in WHO Technical Report Series number 872 (1998). The Working Group, consisting of experts from academia, industry, national regulatory authorities and national control laboratories, reviewed the latest issues of safety, efficacy and quality of YF vaccines and agreed that (i) the revision should focus on live attenuated YF vaccine virus 17D lineage; and that (ii) nonclinical and clinical guidelines for new vaccines prepared from 17D lineage be developed. Copyright © 2010. Published by Elsevier Ltd.. All rights reserved.
38 CFR 21.6120 - Educational and vocational training services.
Code of Federal Regulations, 2010 CFR
2010-07-01
... oriented courses of study and training, completion of which usually results in a diploma, certificate... offered provides the technical skills and knowledge generally regarded as specific to, and required for...
NASA Docking System (NDS) Users Guide: International Space Station Program. Type 4
NASA Technical Reports Server (NTRS)
Tabakman, Alexander
2010-01-01
The NASA Docking System (NDS) Users Guide provides an overview of the basic information needed to integrate the NDS onto a Host Vehicle (HV). This Users Guide is intended to provide a vehicle developer with a fundamental understanding of the NDS technical and operations information to support their program and engineering integration planning. The Users Guide identifies the NDS Specification, Interface Definition or Requirement Documents that contain the complete technical details and requirements that a vehicle developer must use to design, develop and verify their systems will interface with NDS. This Guide is an initial reference and must not be used as a design document. In the event of conflict between this Users Guide and other applicable interface definition or requirements documents; the applicable document will take precedence. This Users Guide is organized in three main sections. Chapter 1 provides an overview of the NDS and CDA hardware and the operations concepts for the NDS. Chapter 2 provides information for Host Vehicle Program integration with the NDS Project Office. Chapter 2 describes the NDS Project organization, integration and verification processes, user responsibilities, and specification and interface requirement documents. Chapter 3 provides a summary of basic technical information for the NDS design. Chapter 3 includes NDS hardware component descriptions, physical size and weight characteristics, and summary of the capabilities and constraints for the various NDS sub-systems.
Civilian Radioactive Waste Management System Requirements Document
DOE Office of Scientific and Technical Information (OSTI.GOV)
C.A. Kouts
2006-05-10
The CRD addresses the requirements of Department of Energy (DOE) Order 413.3-Change 1, ''Program and Project Management for the Acquisition of Capital Assets'', by providing the Secretarial Acquisition Executive (Level 0) scope baseline and the Program-level (Level 1) technical baseline. The Secretarial Acquisition Executive approves the Office of Civilian Radioactive Waste Management's (OCRWM) critical decisions and changes against the Level 0 baseline; and in turn, the OCRWM Director approves all changes against the Level 1 baseline. This baseline establishes the top-level technical scope of the CRMWS and its three system elements, as described in section 1.3.2. The organizations responsible formore » design, development, and operation of system elements described in this document must therefore prepare subordinate project-level documents that are consistent with the CRD. Changes to requirements will be managed in accordance with established change and configuration control procedures. The CRD establishes requirements for the design, development, and operation of the CRWMS. It specifically addresses the top-level governing laws and regulations (e.g., ''Nuclear Waste Policy Act'' (NWPA), 10 Code of Federal Regulations (CFR) Part 63, 10 CFR Part 71, etc.) along with specific policy, performance requirements, interface requirements, and system architecture. The CRD shall be used as a vehicle to incorporate specific changes in technical scope or performance requirements that may have significant program implications. Such may include changes to the program mission, changes to operational capability, and high visibility stakeholder issues. The CRD uses a systems approach to: (1) identify key functions that the CRWMS must perform, (2) allocate top-level requirements derived from statutory, regulatory, and programmatic sources, and (3) define the basic elements of the system architecture and operational concept. Project-level documents address CRD requirements by further defining system element functions, decomposing requirements into significantly greater detail, and developing designs of system components, facilities, and equipment. The CRD addresses the identification and control of functional, physical, and operational boundaries between and within CRWMS elements. The CRD establishes requirements regarding key interfaces between the CRWMS and elements external to the CRWMS. Project elements define interfaces between CRWMS program elements. The Program has developed a change management process consistent with DOE Order 413.3-Change 1. Changes to the Secretarial Acquisition Executive and Program-level baselines must be approved by a Program Baseline Change Control Board. Specific thresholds have been established for identifying technical, cost, and schedule changes that require approval. The CRWMS continually evaluates system design and operational concepts to optimize performance and/or cost. The Program has developed systems analysis tools to assess potential enhancements to the physical system and to determine the impacts from cost saving initiatives, scientific and technological improvements, and engineering developments. The results of systems analyses, if appropriate, are factored into revisions to the CRD as revised Programmatic Requirements.« less
Riem, N; Boet, S; Bould, M D; Tavares, W; Naik, V N
2012-11-01
Both technical skills (TS) and non-technical skills (NTS) are key to ensuring patient safety in acute care practice and effective crisis management. These skills are often taught and assessed separately. We hypothesized that TS and NTS are not independent of each other, and we aimed to evaluate the relationship between TS and NTS during a simulated intraoperative crisis scenario. This study was a retrospective analysis of performances from a previously published work. After institutional ethics approval, 50 anaesthesiology residents managed a simulated crisis scenario of an intraoperative cardiac arrest secondary to a malignant arrhythmia. We used a modified Delphi approach to design a TS checklist, specific for the management of a malignant arrhythmia requiring defibrillation. All scenarios were recorded. Each performance was analysed by four independent experts. For each performance, two experts independently rated the technical performance using the TS checklist, and two other experts independently rated NTS using the Anaesthetists' Non-Technical Skills score. TS and NTS were significantly correlated to each other (r=0.45, P<0.05). During a simulated 5 min resuscitation requiring crisis resource management, our results indicate that TS and NTS are related to one another. This research provides the basis for future studies evaluating the nature of this relationship, the influence of NTS training on the performance of TS, and to determine whether NTS are generic and transferrable between crises that require different TS.
Environmental control medical support team
NASA Technical Reports Server (NTRS)
Crump, William J.; Kilgore, Melvin V., Jr.
1988-01-01
The activities conducted in support of the Environmental Control and Life Support Team during December 7, 1987 through September 30, 1988 are summarized. The majority of the ongoing support has focused on the ECLSS area. Through a series of initial meetings with the ECLSS team and technical literature review, an initial list of critical topics was developed. Subtasks were then identified or additional related tasks received as action items from the ECLSS group meetings. Although most of the efforts focused on providing MSFC personnel with information regarding specific questions and problems related to ECLSS issues, other efforts regarding identifying an ECLSS Medical Support Team and constructing data bases of technical information were also initiated and completed. The specific tasks are as follows: (1) Provide support to the mechanical design and integration of test systems as related to microbiological concerns; (2) Assist with design of Human Subjects Test Protocols; (3) Interpretation and recommendations pertaining to air/water quality requirements; (4) Assist in determining the design specifications required as related to the Technical Demonstration Program; (5) Develop a data base of all microorganisms recovered from previous subsystem testing; (6) Estimates of health risk of individual microbes to test subjects; (7) Assist with setting limits for safety of test subjects; (8) Health monitoring of test subjects; (9) Assist in the preparation of test plans; (10) Assist in the development of a QA/QC program to assure the validity, accuracy and precision of the analyses; and (11) Assist in developing test plans required for future man in the loop testing.
Site systems engineering fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.2
DOE Office of Scientific and Technical Information (OSTI.GOV)
GRYGIEL, M.L.
1998-10-08
Manage the Site Systems Engineering process to provide a traceable integrated requirements-driven, and technically defensible baseline. Through the Site Integration Group(SIG), Systems Engineering ensures integration of technical activities across all site projects. Systems Engineering's primary interfaces are with the RL Project Managers, the Project Direction Office and with the Project Major Subcontractors, as well as with the Site Planning organization. Systems Implementation: (1) Develops, maintains, and controls the site integrated technical baseline, ensures the Systems Engineering interfaces between projects are documented, and maintain the Site Environmental Management Specification. (2) Develops and uses dynamic simulation models for verification of the baselinemore » and analysis of alternatives. (3) Performs and documents fictional and requirements analyses. (4) Works with projects, technology management, and the SIG to identify and resolve technical issues. (5) Supports technical baseline information for the planning and budgeting of the Accelerated Cleanup Plan, Multi-Year Work Plans, Project Baseline Summaries as well as performance measure reporting. (6) Works with projects to ensure the quality of data in the technical baseline. (7) Develops, maintains and implements the site configuration management system.« less
78 FR 36369 - Heavy-Duty Engine and Vehicle, and Nonroad Technical Amendments
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-17
... reference to post-transmissions systems in the hybrid engine test requirements in 40 CFR part 1036 and 49... requirements for testing post-transmission hybrids using a vehicle test. The agencies anticipate that there... out in the regulation specify how to test post-transmission systems. Specifically, 40 CFR 1037.525, 40...
CFD Vision 2030 Study: A Path to Revolutionary Computational Aerosciences
NASA Technical Reports Server (NTRS)
Slotnick, Jeffrey; Khodadoust, Abdollah; Alonso, Juan; Darmofal, David; Gropp, William; Lurie, Elizabeth; Mavriplis, Dimitri
2014-01-01
This report documents the results of a study to address the long range, strategic planning required by NASA's Revolutionary Computational Aerosciences (RCA) program in the area of computational fluid dynamics (CFD), including future software and hardware requirements for High Performance Computing (HPC). Specifically, the "Vision 2030" CFD study is to provide a knowledge-based forecast of the future computational capabilities required for turbulent, transitional, and reacting flow simulations across a broad Mach number regime, and to lay the foundation for the development of a future framework and/or environment where physics-based, accurate predictions of complex turbulent flows, including flow separation, can be accomplished routinely and efficiently in cooperation with other physics-based simulations to enable multi-physics analysis and design. Specific technical requirements from the aerospace industrial and scientific communities were obtained to determine critical capability gaps, anticipated technical challenges, and impediments to achieving the target CFD capability in 2030. A preliminary development plan and roadmap were created to help focus investments in technology development to help achieve the CFD vision in 2030.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Buttner, William; Rivkin, Carl; Burgess, Robert
The United Nations Global Technical Regulation (GTR) Number 13 (Global Technical Regulation on Hydrogen and Fuel Cell Vehicles) is the defining document regulating safety requirements in hydrogen vehicles, and in particular fuel cell electric vehicles (FCEV). GTR Number 13 has been formally implemented and will serve as the basis for the national regulatory standards for FCEV safety in North America (Canada, United States), Japan, Korea, and the European Union. The GTR defines safety requirement for these vehicles, including specifications on the allowable hydrogen levels in vehicle enclosures during in-use and post-crash conditions and on the allowable hydrogen emissions levels inmore » vehicle exhaust during certain modes of normal operation. However, in order to be incorporated into national regulations, that is, in order to be binding, methods to verify compliance to the specific requirements must exist. In a collaborative program, the Sensor Laboratories at the National Renewable Energy Laboratory in the United States and the Joint Research Centre, Institute for Energy and Transport in the Netherlands have been evaluating and developing analytical methods that can be used to verify compliance to the hydrogen release requirement as specified in the GTR.« less
SmartWay Tractor and Trailer Logo Usage Instructions
View a presentation provides guidelines for SmartWay Partners on tractor and trailer logo usage, including SmartWay designated technical specifications and requirements, importance of logo display, how to obtain the logo, and logo placement.
SeaWiFS technical report series. Volume 22: Prelaunch acceptance report for the SeaWFS radiometer
NASA Technical Reports Server (NTRS)
Hooker, Stanford B. (Editor); Firestone, Elaine, R. (Editor); Barnes, Robert A.; Barnes, William L.; Esaias, Wayne E.; Mcclain, Charles R.; Acker, James G. (Editor)
1994-01-01
The final acceptance, or rejection, of the Sea-viewing Wide field-of-view Sensor (SeaWiFS) will be determined by the instrument's on-orbit operation. There is, however, an extensive set of laboratory measurements describing the operating characteristics of the radiometer. Many of the requirements in the Ocean Color Data Mission (OCDM) specifications can be checked only by laboratory measurements. Here, the calibration review panel (composed of the authors of this technical memorandum) examines the laboratory characterization and calibration of SeaWiFS in the light of the OCDM performance specification. Overall, the performance of the SeaWiFS instrument meets or exceeds the requirements of the OCDM contract in all but a few unimportant details. The detailed results of this examination are presented here by following the outline of the specifications, as found in the Contract. The results are presented in the form of requirements and compliance pairs. These results give conclusions on many, but not all, of the performance specifications. The acceptance of this panel of the performance of SeaWiFS must only be considered as an intermediate conclusion. The ultimate acceptance (or rejection) of the SeaWiFS data set will rely on the measurements made by the instrument on orbit.
Technical support for Life Sciences communities on a production grid infrastructure.
Michel, Franck; Montagnat, Johan; Glatard, Tristan
2012-01-01
Production operation of large distributed computing infrastructures (DCI) still requires a lot of human intervention to reach acceptable quality of service. This may be achievable for scientific communities with solid IT support, but it remains a show-stopper for others. Some application execution environments are used to hide runtime technical issues from end users. But they mostly aim at fault-tolerance rather than incident resolution, and their operation still requires substantial manpower. A longer-term support activity is thus needed to ensure sustained quality of service for Virtual Organisations (VO). This paper describes how the biomed VO has addressed this challenge by setting up a technical support team. Its organisation, tooling, daily tasks, and procedures are described. Results are shown in terms of resource usage by end users, amount of reported incidents, and developed software tools. Based on our experience, we suggest ways to measure the impact of the technical support, perspectives to decrease its human cost and make it more community-specific.
Guna Serrano, M del Remedio; Ocete Mochón, M Dolores; Lahiguera, M José; Bresó, M Carmen; Gimeno Cardona, Concepción
2013-02-01
The UNE-EN-ISO 15189:2007 standard defines the requirements for quality and competence that must be met by medical laboratories. These laboratories should use this international standard to develop their own quality management systems and to evaluate their own competencies; in turn, this standard will be used by accreditation bodies to confirm or recognize the laboratories' competence. In clinical microbiology laboratories, application of the standard implies the implementation of the technical and specific management requirements that must be met to achieve optimal quality when carrying out microbiological tests. In Spain, accreditation is granted by the Spanish Accreditation Body (Entidad Nacional de Acreditación). This review aims to discuss the practical application of the standard's technical requirements in mycobacterial laboratory. Firstly, we define the scope of accreditation. Secondly, we specify how the items of the standard on personnel management, control of equipment, environmental facilities, method validation, internal controls and customer satisfaction surveys were developed and implemented in our laboratory. Copyright © 2013 Elsevier España, S.L. All rights reserved.
Overview of Energy Systems' safety analysis report programs
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-03-01
The primary purpose of an Safety Analysis Report (SAR) is to provide a basis for judging the adequacy of a facility's safety. The SAR documents the safety analyses that systematically identify the hazards posed by the facility, analyze the consequences and risk of potential accidents, and describe hazard control measures that protect the health and safety of the public and employees. In addition, some SARs document, as Technical Safety Requirements (TSRs, which include Technical Specifications and Operational Safety Requirements), technical and administrative requirements that ensure the facility is operated within prescribed safety limits. SARs also provide conveniently summarized information thatmore » may be used to support procedure development, training, inspections, and other activities necessary to facility operation. This Overview of Energy Systems Safety Analysis Report Programs'' Provides an introduction to the programs and processes used in the development and maintenance of the SARs. It also summarizes some of the uses of the SARs within Energy Systems and DOE.« less
Overview of Energy Systems` safety analysis report programs. Safety Analysis Report Update Program
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-03-01
The primary purpose of an Safety Analysis Report (SAR) is to provide a basis for judging the adequacy of a facility`s safety. The SAR documents the safety analyses that systematically identify the hazards posed by the facility, analyze the consequences and risk of potential accidents, and describe hazard control measures that protect the health and safety of the public and employees. In addition, some SARs document, as Technical Safety Requirements (TSRs, which include Technical Specifications and Operational Safety Requirements), technical and administrative requirements that ensure the facility is operated within prescribed safety limits. SARs also provide conveniently summarized information thatmore » may be used to support procedure development, training, inspections, and other activities necessary to facility operation. This ``Overview of Energy Systems Safety Analysis Report Programs`` Provides an introduction to the programs and processes used in the development and maintenance of the SARs. It also summarizes some of the uses of the SARs within Energy Systems and DOE.« less
Editing Tips for Technical Publications in the Joint Nuclear Weapons Publication System (JNWPS)
DOE Office of Scientific and Technical Information (OSTI.GOV)
ALLEN, TARA S.
2002-12-01
These editing tips contain helpful suggestions to assist writers who are writing, editing, and publishing technical publications in the JNWPS. The suggestions clarify some of the most common writing problems and requirements of two publications used in the JNWPS: ''DOE-DTRA TP 1-1, Joint Nuclear Weapons Publications System Operating Procedures, Specifications, and Standards, and United States Government Printing Office Style Manual''. Topics include requirements for abbreviations, formats for drafts, layouts of illustrations and tables, appropriate wording for interim changes, guidance for creating a list of effective pages, how to insert and delete pages and paragraphs, referencing other technical publications, use ofmore » revision bars, requirements for safety precautions, use of hyphens, and how to place warnings, cautions, and notes. Also included are a writer's checklist, samples of draft title pages, and a section of helpful tips for the writers who use the department's desktop publishing software program, Adobe{reg_sign} FrameMaker{reg_sign}.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-16
... documents at either http://www.fda.gov/Drugs/DevelopmentApprovalProcess/FormsSubmissionRequirements...Vaccines/GuidanceComplianceRegulatoryInformation/Guidances/default.htm . Dated: April 10, 2013. Leslie Kux...
ERIC Educational Resources Information Center
District of Columbia Public Schools, Washington, DC.
Designed for use by vendors, this guide provides an overview of the objectives for the 5-year computer literacy program to be implemented in the District of Columbia Public Schools; outlines requirements which are mandatory elements of vendors' bids unless explicitly designated "desirable"; and details specifications for computing…
2013-04-12
DTL-38999 Connector, Electrical, Circular, Miniature, High Density, Quick Disconnect (Bayonet, Threaded , and Breach Coupling), Environment Resistant ...186 Table 1160-1. Resistance Tolerance and Required Derating...For MIL-DTL-5015 Connector, Electrical, Circular Threaded , AN Type, General Specification for MIL-H-6088G(1) Heat Treatment of Aluminum Alloys
ERIC Educational Resources Information Center
Heidt, Edward A.; Zajkowski, M. Michael
The U.S. Naval Reserve Officer Training Corps (NROTC), offered through host colleges and universities, requires enrolled midshipmen to complete all institutional requirements for the baccalaureate degree in a technical or scientific field or an academic major of interest to the Navy, and to complete specific naval science courses. This study…
ERIC Educational Resources Information Center
Ohio State Univ., Columbus. National Center for Research in Vocational Education.
This short course in welding high and low pressure lines was adapted from military curriculum materials for use in vocational education. The course is designed to teach safety requirements for work with high and low pressure pipelines; pipe welding requirements and specifications; special pipeline repair welding applications; layout of pipe…
Integrated Requirements Analysis and Technology Roadmaps
NASA Technical Reports Server (NTRS)
1997-01-01
In fiscal year 1997, Strategic Insight performed analytical studies for NASA's Highly Reusable Space Transportation (HRST) program, creating program documents which illuminated technical requirements and critical research opportunities. Studies were performed to structure and confirm HRST's evolving technical requirements, building on Marshall's Phase 1 work, which defined HRST system concepts, analytical tools and high-level issues for assessment in Phase 2. Specifically, Strategic Insight: (1) Performed a requirements analysis to update HRST: An Advanced Concepts Study, Study Guidelines, Version 2.0 of January 22, 1996; only minor changes were recommended for the given parameters of interest to concept designers; (2) Conducted mini-workshops during HRST Working Group meetings on April 14-15, 1997 and July 22-24, 1997; and (3) Created structures for technology road maps of candidate HRST concepts, both subsystem and end-to-end concepts, emerging from the 13 cooperative agreement projects.
Teleworking in connection with technical aids for disabled persons.
Alimandi, L; Andrich, R; Porqueddu, B
1995-01-01
An experimental teleworking arrangement was established between Milan and Rome in order to evaluate the use of multimedia technology and remote working for improving the service provided by an information and advice centre for the disabled. This activity requires a highly interdisciplinary approach and both clinical and technical expertise. The hypothesis was that offering the lone expert in Rome the possibility of teleconsulting with colleagues in Milan (where the whole range of expertise was available) would provide a comprehensive service for disabled clients asking for advice on technical aids in Rome. The results of an experiment demonstrated the feasibility of such teleworking and allowed a teleconsulting method to be defined that fits the specific needs of the technical-aid information service and improves quality.
Evaluation of ERDA-sponsored coal feed system development
NASA Technical Reports Server (NTRS)
Phen, R. L.; Luckow, W. K.; Mattson, L.; Otth, D.; Tsou, P.
1977-01-01
Coal feeders were evaluated based upon criteria such as technical feasibility, performance (i.e. ability to meet process requirements), projected life cycle costs, and projected development cost. An initial set of feeders was selected based on the feeders' cost savings potential compared with baseline lockhopper systems. Additional feeders were considered for selection based on: (1) increasing the probability of successful feeder development; (2) application to specific processes; and (3) technical merit. A coal feeder development program is outlined.
Rapid field detection of moisture content for base and subgrade : technical report.
DOT National Transportation Integrated Search
2015-03-01
Mixing and compacting soil and flexible base pavement materials at the proper moisture content is critical : for obtaining adequate compaction and meeting construction specification requirements. This project sought : to evaluate rapid non-nuclear te...
Compliance assurance monitoring is intended to provide a reasonable assurance of compliance with applicable requirements under the Clean Air Act for large emission units that rely on pollution control device equipment to achieve compliance.
NASA Astrophysics Data System (ADS)
Gonzalez, J. C.; Kurlandczyk, H.; Schmid, C.; Schneller, D.
2016-08-01
One of the critical activities in the systems engineering scope of work is managing requirements. In line with this, E-ELT devotes a significant effort to this activity, which follows a well-established process. This involves optimally deriving requirements from the user (Top-Level Requirements) through the system Level 1 Requirements and from here down to subsystems procurement specifications. This paper describes the process, which is illustrated with some practical examples, including in particular the role of technical budgets to derive requirements on subsystems. Also, the provisions taken for the requirements verification are discussed.
Scaffold Translation: Barriers Between Concept and Clinic
Murphy, William L.
2011-01-01
Translation of scaffold-based bone tissue engineering (BTE) therapies to clinical use remains, bluntly, a failure. This dearth of translated tissue engineering therapies (including scaffolds) remains despite 25 years of research, research funding totaling hundreds of millions of dollars, over 12,000 papers on BTE and over 2000 papers on BTE scaffolds alone in the past 10 years (PubMed search). Enabling scaffold translation requires first an understanding of the challenges, and second, addressing the complete range of these challenges. There are the obvious technical challenges of designing, manufacturing, and functionalizing scaffolds to fill the Form, Fixation, Function, and Formation needs of bone defect repair. However, these technical solutions should be targeted to specific clinical indications (e.g., mandibular defects, spine fusion, long bone defects, etc.). Further, technical solutions should also address business challenges, including the need to obtain regulatory approval, meet specific market needs, and obtain private investment to develop products, again for specific clinical indications. Finally, these business and technical challenges present a much different model than the typical research paradigm, presenting the field with philosophical challenges in terms of publishing and funding priorities that should be addressed as well. In this article, we review in detail the technical, business, and philosophical barriers of translating scaffolds from Concept to Clinic. We argue that envisioning and engineering scaffolds as modular systems with a sliding scale of complexity offers the best path to addressing these translational challenges. PMID:21902613
Human research ethics committees in technical universities.
Koepsell, David; Brinkman, Willem-Paul; Pont, Sylvia
2014-07-01
Human research ethics has developed in both theory and practice mostly from experiences in medical research. Human participants, however, are used in a much broader range of research than ethics committees oversee, including both basic and applied research at technical universities. Although mandated in the United States, the United Kingdom, Canada, and Australia, non-medical research involving humans need not receive ethics review in much of Europe, Asia, Latin America, and Africa. Our survey of the top 50 technical universities in the world shows that, where not specifically mandated by law, most technical universities do not employ ethics committees to review human studies. As the domains of basic and applied sciences expand, ethics committees are increasingly needed to guide and oversee all such research regardless of legal requirements. We offer as examples, from our experience as an ethics committee in a major European technical university, ways in which such a committee provides needed services and can help ensure more ethical studies involving humans outside the standard medical context. We provide some arguments for creating such committees, and in our supplemental article, we provide specific examples of cases and concerns that may confront technical, engineering, and design research, as well as outline the general framework we have used in creating our committee. © The Author(s) 2014.
The technical consideration of multi-beam mask writer for production
NASA Astrophysics Data System (ADS)
Lee, Sang Hee; Ahn, Byung-Sup; Choi, Jin; Shin, In Kyun; Tamamushi, Shuichi; Jeon, Chan-Uk
2016-10-01
Multi-beam mask writer is under development to solve the throughput and patterning resolution problems in VSB mask writer. Theoretically, the writing time is appropriate for future design node and the resolution is improved with multi-beam mask writer. Many previous studies show the feasible results of resolution, CD control and registration. Although such technical results of development tool seem to be enough for mass production, there are still many unexpected problems for real mass production. In this report, the technical challenges of multi-beam mask writer are discussed in terms of production and application. The problems and issues are defined based on the performance of current development tool compared with the requirements of mask quality. Using the simulation and experiment, we analyze the specific characteristics of electron beam in multi-beam mask writer scheme. Consequently, we suggest necessary specifications for mass production with multi-beam mask writer in the future.
Software Dependability and Safety Evaluations ESA's Initiative
NASA Astrophysics Data System (ADS)
Hernek, M.
ESA has allocated funds for an initiative to evaluate Dependability and Safety methods of Software. The objectives of this initiative are; · More extensive validation of Safety and Dependability techniques for Software · Provide valuable results to improve the quality of the Software thus promoting the application of Dependability and Safety methods and techniques. ESA space systems are being developed according to defined PA requirement specifications. These requirements may be implemented through various design concepts, e.g. redundancy, diversity etc. varying from project to project. Analysis methods (FMECA. FTA, HA, etc) are frequently used during requirements analysis and design activities to assure the correct implementation of system PA requirements. The criticality level of failures, functions and systems is determined and by doing that the critical sub-systems are identified, on which dependability and safety techniques are to be applied during development. Proper performance of the software development requires the development of a technical specification for the products at the beginning of the life cycle. Such technical specification comprises both functional and non-functional requirements. These non-functional requirements address characteristics of the product such as quality, dependability, safety and maintainability. Software in space systems is more and more used in critical functions. Also the trend towards more frequent use of COTS and reusable components pose new difficulties in terms of assuring reliable and safe systems. Because of this, its dependability and safety must be carefully analysed. ESA identified and documented techniques, methods and procedures to ensure that software dependability and safety requirements are specified and taken into account during the design and development of a software system and to verify/validate that the implemented software systems comply with these requirements [R1].
Framework for incorporating simulation into urology training.
Arora, Sonal; Lamb, Benjamin; Undre, Shabnam; Kneebone, Roger; Darzi, Ara; Sevdalis, Nick
2011-03-01
• Changes to working hours, new technologies and increased accountability have rendered the need for alternative training environments for urologists. • Simulation offers a promising arena for learning to take place in a safe, realistic setting. • Despite its benefits, the incorporation of simulation into urological training programmes remains minimal. • The current status and future directions of simulation for training in technical and non-technical skills are reviewed as they pertain to urology. • A framework is presented for how simulation-based training could be incorporated into the entire urological curriculum. • The literature on simulation in technical and non-technical skills training is reviewed, with a specific focus upon urology. • To fully integrate simulation into a training curriculum, its possibilities for addressing all the competencies required by a urologist must be realized. • At an early stage of training, simulation has been used to develop basic technical skills and cognitive skills, such as decision-making and communication. • At an intermediate stage, the studies focus upon more advanced technical skills learnt with virtual reality simulators. • Non-technical skills training would include leadership and could be delivered with in situ models. • At the final stage, experienced trainees can practise technical and non-technical skills in full crisis simulations situated within a fully-simulated operating rooms. • Simulation can provide training in the technical and non-technical skills required to be a competent urologist. • The framework presented may guide how best to incorporate simulation into training curricula. • Future work should determine whether acquired skills transfer to clinical practice and improve patient care. © 2010 THE AUTHORS. BJU INTERNATIONAL © 2010 BJU INTERNATIONAL.
Code of Federal Regulations, 2014 CFR
2014-10-01
... properly marked valve; and (iv) A UN pressure receptacle is marked with “USA” as a country of approval in...) manufactured to other than a DOT specification or a UN standard in accordance with part 178 of this subchapter.... (2) Cylinders (including UN pressure receptacles) transported to, from, or within the United States...
Code of Federal Regulations, 2012 CFR
2012-10-01
... properly marked valve; and (iv) A UN pressure receptacle is marked with “USA” as a country of approval in...) manufactured to other than a DOT specification or a UN standard in accordance with part 178 of this subchapter.... (2) Cylinders (including UN pressure receptacles) transported to, from, or within the United States...
Code of Federal Regulations, 2013 CFR
2013-10-01
... properly marked valve; and (iv) A UN pressure receptacle is marked with “USA” as a country of approval in...) manufactured to other than a DOT specification or a UN standard in accordance with part 178 of this subchapter.... (2) Cylinders (including UN pressure receptacles) transported to, from, or within the United States...
Code of Federal Regulations, 2010 CFR
2010-10-01
... properly marked valve; and (iv) A UN pressure receptacle is marked with “USA” as a country of approval in...) manufactured to other than a DOT specification or a UN standard in accordance with part 178 of this subchapter.... (2) Cylinders (including UN pressure receptacles) transported to, from, or within the United States...
Code of Federal Regulations, 2011 CFR
2011-10-01
... properly marked valve; and (iv) A UN pressure receptacle is marked with “USA” as a country of approval in...) manufactured to other than a DOT specification or a UN standard in accordance with part 178 of this subchapter.... (2) Cylinders (including UN pressure receptacles) transported to, from, or within the United States...
ERIC Educational Resources Information Center
Froman, Terry; Brown, Shelly
2009-01-01
According to Florida Law, students must pass the Grade 10 FCAT, among other academic requirements, in order to receive a standard high school diploma. Specifically, students must achieve a "passing" score of 300 or above on both the FCAT SSS Reading and the FCAT SSS Mathematics tests. Technically, students can retake the FCAT as many…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Channell, J.K.; Walker, B.A.
2000-05-01
Specifically this report: 1. Compares requirements of the WAP that are pertinent from a technical viewpoint with the WIPP pre-Permit waste characterization program, 2. Presents the results of a risk analysis of the currently emplaced wastes. Expected and bounding risks from routine operations and possible accidents are evaluated; and 3. Provides conclusions and recommendations.
10 CFR Appendix C to Part 52 - Design Certification Rule for the AP600 Design
Code of Federal Regulations, 2013 CFR
2013-01-01
... design, in accordance with 10 CFR part 52, subpart B. The applicant for certification of the AP600 design... appendix. B. Generic technical specifications means the information, required by 10 CFR 50.36 and 50.36a... licensee must meet the requirement in Section III.B of this appendix to reference Tier 2 when referencing...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Buttner, William; Rivkin, C.; Burgess, R.
Here, the United Nations Economic Commission for Europe Global Technical Regulation (GTR) Number 13 ( Global Technical Regulation on Hydrogen and Fuel Cell Vehicles) is the defining document regulating safety requirements in hydrogen vehicles, and in particular, fuel cell electric vehicles (FCEVs). GTR Number 13 has been formally adopted and will serve as the basis for the national regulatory standards for FCEV safety in North America (led by the United States), Japan, Korea, and the European Union. The GTR defines safety requirements for these vehicles, including specifications on the allowable hydrogen levels in vehicle enclosures during in-use and post-crash conditionsmore » and on the allowable hydrogen emissions levels in vehicle exhaust during certain modes of normal operation. However, in order to be incorporated into national regulations, that is, to be legally binding, methods to verify compliance with the specific requirements must exist. In a collaborative program, the Sensor Laboratories at the National Renewable Energy Laboratory in the United States and the Joint Research Centre, Institute for Energy and Transport in the Netherlands have been evaluating and developing analytical methods that can be used to verify compliance with the hydrogen release requirements as specified in the GTR.« less
Procurement engineering - the productivity factor
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bargerstock, S.B.
1993-01-01
The industry is several years on the road to implementation of the Nuclear Management and Resources Council (NUMARC) initiatives on commercial-grade item dedication and procurement. Utilities have taken several approaches to involve engineering in the procurement process. A common result for the approaches is the additional operations and maintenance (O M) cost imposed by the added resource requirements. Procurement engineering productivity is a key element in controlling this business area. Experience shows that 400 to 500% improvements in productivity are possible with a 2-yr period. Improving the productivity of the procurement engineering function is important in today's competitive utility environment.more » Procurement engineering typically involves four distinct technical evaluation responsibilities along with several administrative areas. Technical evaluations include the functionally based safety classification of replacement components and parts (lacking a master parts list), the determination of dedication requirements for safety-related commercial-grade items, the preparation of a procurement specification to maintain the licensed design bases, and the equivalency evaluation of alternate items not requiring the design-change process. Administrative duties include obtaining technical review of vendor-supplied documentation, identifying obsolete parts and components, resolving material nonconformances, initiating the design-change process for replacement items (as needed), and providing technical support to O M. Although most utilities may not perform or require all the noted activities, a large percentage will apply to each utility station.« less
Recommendations for the treatment of aging in standard technical specifications
DOE Office of Scientific and Technical Information (OSTI.GOV)
Orton, R.D.; Allen, R.P.
1995-09-01
As part of the US Nuclear Regulatory Commission`s Nuclear Plant Aging Research Program, Pacific Northwest Laboratory (PNL) evaluated the standard technical specifications for nuclear power plants to determine whether the current surveillance requirements (SRs) were effective in detecting age-related degradation. Nuclear Plant Aging Research findings for selected systems and components were reviewed to identify the stressors and operative aging mechanisms and to evaluate the methods available to detect, differentiate, and trend the resulting aging degradation. Current surveillance and testing requirements for these systems and components were reviewed for their effectiveness in detecting degraded conditions and for potential contributions to prematuremore » degradation. When the current surveillance and testing requirements appeared ineffective in detecting aging degradation or potentially could contribute to premature degradation, a possible deficiency in the SRs was identified that could result in undetected degradation. Based on this evaluation, PNL developed recommendations for inspection, surveillance, trending, and condition monitoring methods to be incorporated in the SRs to better detect age- related degradation of these selected systems and components.« less
Parametric Cost Study of AC-DC Wayside Power Systems
DOT National Transportation Integrated Search
1975-09-01
The wayside power system provides all the power requirements of an electric vehicle operating on a fixed guideway. For a given set of specifications there are numerous wayside power supply configurations which will be satisfactory from a technical st...
1991-05-01
or may not bypass the editing function. At present, editing rules beyond those required for translation have not been stipulated. 2When explicit... editing rules become defined, the editor at a site LGN may perform two levels of edit checking: warning, which would insert blanks or pass as submitted...position image transactions into a transaction set. This low-level edit checking is performed at the site LGN to reduce transmission costs and to
Instrumentation and control of harmonic oscillators via a single-board microprocessor-FPGA device.
Picone, Rico A R; Davis, Solomon; Devine, Cameron; Garbini, Joseph L; Sidles, John A
2017-04-01
We report the development of an instrumentation and control system instantiated on a microprocessor-field programmable gate array (FPGA) device for a harmonic oscillator comprising a portion of a magnetic resonance force microscope. The specific advantages of the system are that it minimizes computation, increases maintainability, and reduces the technical barrier required to enter the experimental field of magnetic resonance force microscopy. Heterodyne digital control and measurement yields computational advantages. A single microprocessor-FPGA device improves system maintainability by using a single programming language. The system presented requires significantly less technical expertise to instantiate than the instrumentation of previous systems, yet integrity of performance is retained and demonstrated with experimental data.
Instrumentation and control of harmonic oscillators via a single-board microprocessor-FPGA device
NASA Astrophysics Data System (ADS)
Picone, Rico A. R.; Davis, Solomon; Devine, Cameron; Garbini, Joseph L.; Sidles, John A.
2017-04-01
We report the development of an instrumentation and control system instantiated on a microprocessor-field programmable gate array (FPGA) device for a harmonic oscillator comprising a portion of a magnetic resonance force microscope. The specific advantages of the system are that it minimizes computation, increases maintainability, and reduces the technical barrier required to enter the experimental field of magnetic resonance force microscopy. Heterodyne digital control and measurement yields computational advantages. A single microprocessor-FPGA device improves system maintainability by using a single programming language. The system presented requires significantly less technical expertise to instantiate than the instrumentation of previous systems, yet integrity of performance is retained and demonstrated with experimental data.
NASA Technical Reports Server (NTRS)
Goldfarb, W.; Carpenter, L. C.; Redhed, D. D.; Hansen, S. D.; Anderson, L. O.; Kawaguchi, A. S.
1973-01-01
The computing system design of IPAD is described and the requirements which form the basis for the system design are discussed. The system is presented in terms of a functional design description and technical design specifications. The functional design specifications give the detailed description of the system design using top-down structured programming methodology. Human behavioral characteristics, which specify the system design at the user interface, security considerations, and standards for system design, implementation, and maintenance are also part of the technical design specifications. Detailed specifications of the two most common computing system types in use by the major aerospace companies which could support the IPAD system design are presented. The report of a study to investigate migration of IPAD software between the two candidate 3rd generation host computing systems and from these systems to a 4th generation system is included.
[Immunohistochemistry in the diagnosis of sarcomas].
Decouvelaere, Anne-Valérie
2015-01-01
Immunohistochemistry (IHC) is essential in the diagnosis of soft tissue tumor and must rely on good quality technic. Among useful antibodies, it is important to distinguish those with a poor specificity required in order to establish the broad lineage, from those with high specificity, which may lead straightforward towards the entity. Diagnostically useful antibodies such as myogenin, ALK1 and DOG1 have been recently completed by MUC4 and STAT6 which show good sensitivity and specificity in the diagnosis of low-grade fibromyxoid sarcoma and solitary fibrous tumor respectively. ERG is also an interesting antibody. However, it is not completely specific of vascular tumors. Moreover, available material is often limited because of the increase of microbiopsy specimens. Therefore, it is mandatory to optimize this precious tissue by using these new antibodies, especially because molecular technics are increasingly performed in addition to IHC. Copyright © 2014 Elsevier Masson SAS. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ives, Robert Lawrence; Marsden, David; Collins, George
Calabazas Creek Research, Inc. developed a 1.5 MW RF load for the ITER fusion research facility currently under construction in France. This program leveraged technology developed in two previous SBIR programs that successfully developed high power RF loads for fusion research applications. This program specifically focused on modifications required by revised technical performance, materials, and assembly specification for ITER. This program implemented an innovative approach to actively distribute the RF power inside the load to avoid excessive heating or arcing associated with constructive interference. The new design implemented materials and assembly changes required to meet specifications. Critical components were builtmore » and successfully tested during the program.« less
Standardization of quantum technologies and QKD activities within ETSI (Conference Presentation)
NASA Astrophysics Data System (ADS)
Lenhart, Gaby
2016-04-01
In order to establish new ICT technologies successfully on the market it is essential to build trust within any potential users. This is especially true for technologies which are based upon paradigms that are not yet familiar to these users, such as quantum technologies. Technical standards are an excellent means to offer a certain degree of legal reliability and technical interoperability that is required by industry for commercial take up. While such standards on the one hand must be clear enough to provide strict rules for implementers, on the other hand they also must remain flexible enough to not restrict progress in further research and development on the standardized technology. Hence such standards have to be produced by a wide variety of stakeholders taking into account all their different needs. The paper will provide some insight into the general mechanisms of standardization and their relation to quantum technologies. Alongside with the relevance of standardization as an enabler for certification of quantum based technologies it will explain its potential for securing intellectual property. In its first part paper will concentrate on the advantages of standardization and discuss fears some of the stakeholders share, in detail. The second part will focus on the technical work going on in ETSI in relation to quantum technologies. In 2008 ETSI created a standards work group on Quantum Key Distribution, the ETSI ISG QKD and more recently a group on Quantum-Safe Cryptography, the ETSI ISG QSC. A significant part of the technical work of these groups has already been published and will be introduced in the following. However a big share of work is still ongoing and lot more is planned for the future, as are continuous revisions and updates of the published specifications. This standardization work covers several levels: It starts of by problem statements in the form of use cases, from which technical requirements can be derived. These requirements then form the base upon which a reference architecture is created. Various different specifications describe in detail components, protocols and interfaces. An ontology is developed in order to guarantee common understanding of the technical terms used in standardization for quantum technologies. Special emphasis is provided to security proofs.
77 FR 27490 - Plant-Specific Adoption, Revision 4 of the Improved Standard Technical Specifications
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-10
...,'' NUREG-1432, ``Standard Technical Specifications, Combustion Engineering Plants,'' NUREG-1433, ``Standard..., ``Standard Technical Specifications, Combustion Engineering Plants'' Revision 4, ADAMS Accession No..., Westinghouse Plants''.. NUREG-1432, ``Standard Technical ML12102A165 ML12102A169 Specifications, Combustion...
10 CFR 61.12 - Specific technical information.
Code of Federal Regulations, 2010 CFR
2010-01-01
... NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE... of the land disposal facility and the disposal units. For near-surface disposal, the description must...; structural stability of backfill, wastes, and covers; contact of wastes with standing water; disposal site...
10 CFR 61.12 - Specific technical information.
Code of Federal Regulations, 2014 CFR
2014-01-01
... NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE... of the land disposal facility and the disposal units. For near-surface disposal, the description must...; structural stability of backfill, wastes, and covers; contact of wastes with standing water; disposal site...
10 CFR 61.12 - Specific technical information.
Code of Federal Regulations, 2012 CFR
2012-01-01
... NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE... of the land disposal facility and the disposal units. For near-surface disposal, the description must...; structural stability of backfill, wastes, and covers; contact of wastes with standing water; disposal site...
10 CFR 61.12 - Specific technical information.
Code of Federal Regulations, 2013 CFR
2013-01-01
... NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE... of the land disposal facility and the disposal units. For near-surface disposal, the description must...; structural stability of backfill, wastes, and covers; contact of wastes with standing water; disposal site...
10 CFR 61.12 - Specific technical information.
Code of Federal Regulations, 2011 CFR
2011-01-01
... NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE... of the land disposal facility and the disposal units. For near-surface disposal, the description must...; structural stability of backfill, wastes, and covers; contact of wastes with standing water; disposal site...
MultiLIS: A Description of the System Design and Operational Features.
ERIC Educational Resources Information Center
Kelly, Glen J.; And Others
1988-01-01
Describes development, hardware requirements, and features of the MultiLIS integrated library software package. A system profile provides pricing information, operational characteristics, and technical specifications. Sidebars discuss MultiLIS integration structure, incremental architecture, and NCR Tower Computers. (4 references) (MES)
NASA Astrophysics Data System (ADS)
Vilja, John; Levack, Daniel
1993-04-01
The objectives were to assess what design changes would be required to remit late production of the J-2S engine for use as a large high energy upper stage engine. The study assessed design changes required to perform per the J-2S model specification, manufacturing changes required due to obsolescence or improvements in state-of-the-practice, availability issues for supplier provided items, and provided cost and schedule estimates for this configuration. The confidence that J-2S production could be reinitiated within reasonable costs and schedules was provided. No significant technical issues were identified in either the producibility study or in the review of previous technical data. Areas of potential cost reduction were identified which could be quantified to a greater extent with further manufacturing planning. The proposed schedule can be met with no foreseeable impacts. The results of the study provided the necessary foundation for the detailed manufacturing and test plans and non-recurring and recurring cost estimates that are needed to complete the effort to reinitiate production of the J-2S engine system.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vargo, G.F. Jr.
1994-10-11
The DOE Standard defines the configuration management program by the five basic program elements of ``program management,`` ``design requirements,`` ``document control,`` ``change control,`` and ``assessments,`` and the two adjunct recovery programs of ``design reconstitution,`` and ``material condition and aging management. The C-M model of five elements and two adjunct programs strengthen the necessary technical and administrative control to establish and maintain a consistent technical relationship among the requirements, physical configuration, and documentation. Although the DOE Standard was originally developed for the operational phase of nuclear facilities, this plan has the flexibility to be adapted and applied to all life-cycle phasesmore » of both nuclear and non-nuclear facilities. The configuration management criteria presented in this plan endorses the DOE Standard and has been tailored specifically to address the technical relationship of requirements, physical configuration, and documentation during the full life-cycle of the 101-SY Hydrogen Mitigation Test Project Mini-Data Acquisition and Control System of Tank Waste Remediation System.« less
Conti, Andrea Alberto
2014-08-20
Court-appointed Technical Consultants (CTCs) are fundamental figures in the Italian judicial system. CTCs are experts appointed by judges in order to supplement their activities by ascertaining, collecting and analyzing facts concerning the specific subject of a lawsuit. These experts formulate opinions, gather motivations and perform checks to provide clear, objective and irrefutable answers to the questions posed by judges. With direct reference to the medical field, while police doctors (specialists in forensic medicine) follow an academic, dedicated, well-structured educational curriculum, the University specialty school in Forensic Medicine, other medical CTCs, though not infrequently luminaries with one or many medical specialties and professional acknowledgments, may have no specific legal-medicine and juridical expertise, precisely because a similar expertise is not formally required of them. In the light of these considerations, in Italy some professionals of the legal world, and of the health context too, have proposed for medical CTCs targeted educational pathways, which would provide these experts with formal specific qualifications. In synthesis and in conclusion, a full knowledge and a rigorous respect of the rules of legal proceedings emerge as increasingly important characteristics for current and future Court-appointed Technical Consultants, together with a specific educational curriculum.
[Technical specification for clinical application of critical ultrasonography].
Yin, M G; Wang, X T; Liu, D W; Chao, Y G; Guan, X D; Kang, Y; Yan, J; Ma, X C; Tang, Y Q; Hu, Z J; Yu, K J; Chen, D C; Ai, Y H; Zhang, L N; Zhang, H M; Wu, J; Liu, L X; Zhu, R; He, W; Zhang, Q; Ding, X; Li, L; Li, Y; Liu, H T; Zeng, Q B; Si, X; Chen, H; Zhang, J W; Xu, Q H; Chen, W J; Chen, X K; Huang, D Z; Cai, S H; Shang, X L; Guan, J; Du, J; Zhao, L; Wang, M J; Cui, S; Wang, X M; Zhou, R; Zeng, X Y; Wang, Y P; Lyu, L W; Zhu, W H; Zhu, Y; Duan, J; Yang, J; Yang, H
2018-06-01
Critical ultrasonography(CUS) is different from the traditional diagnostic ultrasound, the examiner and interpreter of the image are critical care medicine physicians. The core content of CUS is to evaluate the pathophysiological changes of organs and systems and etiology changes. With the idea of critical care medicine as the soul, it can integrate the above information and clinical information, bedside real-time diagnosis and titration treatment, and evaluate the therapeutic effect so as to improve the outcome. CUS is a traditional technique which is applied as a new application method. The consensus of experts on critical ultrasonography in China released in 2016 put forward consensus suggestions on the concept, implementation and application of CUS. It should be further emphasized that the accurate and objective assessment and implementation of CUS requires the standardization of ultrasound image acquisition and the need to establish a CUS procedure. At the same time, the standardized training for CUS accepted by critical care medicine physicians requires the application of technical specifications, and the establishment of technical specifications is the basis for the quality control and continuous improvement of CUS. Chinese Critical Ultrasound Study Group and Critical Hemodynamic Therapy Collabration Group, based on the rich experience of clinical practice in critical care and research, combined with the essence of CUS, to learn the traditional ultrasonic essence, established the clinical application technical specifications of CUS, including in five parts: basic view and relevant indicators to obtain in CUS; basic norms for viscera organ assessment and special assessment; standardized processes and systematic inspection programs; examples of CUS applications; CUS training and the application of qualification certification. The establishment of applied technology standard is helpful for standardized training and clinical correct implementation. It is helpful for clinical evaluation and correct guidance treatment, and is also helpful for quality control and continuous improvement of CUS application.
NASA Technical Reports Server (NTRS)
1974-01-01
All general purpose equipment items contained in the final carry-on laboratory (COL) design concepts are described in terms of specific requirements identified for COL use, hardware status, and technical parameters such as weight, volume, power, range, and precision. Estimated costs for each item are given, along with projected development times.
United States Air Force Annual Financial Statements
2002-01-01
the Naval Postgraduate School and AFIT. While specific rec- ommendations are still in process, better cooperation, exchange of professors, and a common ...address schedule, technical, pro- grammatic, and performance risk; (3) the impact of capabilities-based requirements on system trade-off decisions; and (4...methodology to consider the impact of “aging” aircraft on the funding requirements . The model resulted in the identification and correct
Repository-based software engineering program: Concept document
NASA Technical Reports Server (NTRS)
1992-01-01
This document provides the context for Repository-Based Software Engineering's (RBSE's) evolving functional and operational product requirements, and it is the parent document for development of detailed technical and management plans. When furnished, requirements documents will serve as the governing RBSE product specification. The RBSE Program Management Plan will define resources, schedules, and technical and organizational approaches to fulfilling the goals and objectives of this concept. The purpose of this document is to provide a concise overview of RBSE, describe the rationale for the RBSE Program, and define a clear, common vision for RBSE team members and customers. The document also provides the foundation for developing RBSE user and system requirements and a corresponding Program Management Plan. The concept is used to express the program mission to RBSE users and managers and to provide an exhibit for community review.
Small image laser range finder for planetary rover
NASA Technical Reports Server (NTRS)
Wakabayashi, Yasufumi; Honda, Masahisa; Adachi, Tadashi; Iijima, Takahiko
1994-01-01
A variety of technical subjects need to be solved before planetary rover navigation could be a part of future missions. The sensors which will perceive terrain environment around the rover will require critical development efforts. The image laser range finder (ILRF) discussed here is one of the candidate sensors because of its advantage in providing range data required for its navigation. The authors developed a new compact-sized ILRF which is a quarter of the size of conventional ones. Instead of the current two directional scanning system which is comprised of nodding and polygon mirrors, the new ILRF is equipped with the new concept of a direct polygon mirror driving system, which successfully made its size compact to accommodate the design requirements. The paper reports on the design concept and preliminary technical specifications established in the current development phase.
CAD/CAM data management needs, requirements and options
NASA Technical Reports Server (NTRS)
Lopatka, R. S.; Johnson, T. G.
1978-01-01
The requirements for a data management system in support of technical or scientific applications and possible courses of action were reviewed. Specific requirements were evolved while working towards higher level integration impacting all phases of the current design process and through examination of commercially marketed systems and related data base research. Arguments are proposed for varied approaches in implementing data base systems ranging from no action necessary to immediate procurement of an existing data base management system.
Scaffold translation: barriers between concept and clinic.
Hollister, Scott J; Murphy, William L
2011-12-01
Translation of scaffold-based bone tissue engineering (BTE) therapies to clinical use remains, bluntly, a failure. This dearth of translated tissue engineering therapies (including scaffolds) remains despite 25 years of research, research funding totaling hundreds of millions of dollars, over 12,000 papers on BTE and over 2000 papers on BTE scaffolds alone in the past 10 years (PubMed search). Enabling scaffold translation requires first an understanding of the challenges, and second, addressing the complete range of these challenges. There are the obvious technical challenges of designing, manufacturing, and functionalizing scaffolds to fill the Form, Fixation, Function, and Formation needs of bone defect repair. However, these technical solutions should be targeted to specific clinical indications (e.g., mandibular defects, spine fusion, long bone defects, etc.). Further, technical solutions should also address business challenges, including the need to obtain regulatory approval, meet specific market needs, and obtain private investment to develop products, again for specific clinical indications. Finally, these business and technical challenges present a much different model than the typical research paradigm, presenting the field with philosophical challenges in terms of publishing and funding priorities that should be addressed as well. In this article, we review in detail the technical, business, and philosophical barriers of translating scaffolds from Concept to Clinic. We argue that envisioning and engineering scaffolds as modular systems with a sliding scale of complexity offers the best path to addressing these translational challenges. © Mary Ann Liebert, Inc.
Conceptualizing 2000: Proactive Planning.
ERIC Educational Resources Information Center
Angel, Dan, Ed.; DeVault, Mike, Ed.
As community, technical, and junior colleges approach the 21st century, faculty shortages, an increasingly diverse student body, dwindling financial resources, and accountability mandates will require careful, action-oriented college planning. This two-part book presents 10 articles on the dynamics of planning and specific planning models, and…
Apprenticeship: Past and Present
ERIC Educational Resources Information Center
La Luz, 1977
1977-01-01
Rapid changes in our industrial system require a large body of skilled workers who are able to carry out technical specifications and who can supervise less skilled members of the work force. This article discusses modern apprenticeship programs, certificates of completion, joint apprenticeship committees, basic standards for apprenticeship, and…
DOT National Transportation Integrated Search
2015-03-01
Kansas experiences harsh winters that require frequent use of de-icing salts, making it : critical to the long-term durability of concrete structures that the permeability is kept : under control. Under current KDOT specification, the Rapid Chloride ...
Designing Needs Statements in a Systematic Iterative Way
ERIC Educational Resources Information Center
Verstegen, D. M. L.; Barnard, Y. F.; Pilot, A.
2009-01-01
Designing specifications for technically advanced instructional products, such as e-learning, simulations or simulators requires different kinds of expertise. The SLIM method proposes to involve all stakeholders from the beginning in a series of workshops under the guidance of experienced instructional designers. These instructional designers…
NASA Technical Reports Server (NTRS)
Wolfe, M. G.
1978-01-01
The objectives of this study were to: (1) develop projections of the NASA, DoD, and civil space power requirements for the 1980-1995 time period; (2) identify specific areas of application and space power subsystem type needs for each prospective user; (3) document the supporting and historical base, including relevant cost related measures of performance; and (4) quantify the benefits of specific technology projection advancements. The initial scope of the study included: (1) construction of likely models for NASA, DoD, and civil space systems; (2) generation of a number of future scenarios; (3) extraction of time phased technology requirements based on the scenarios; and (4) cost/benefit analyses of some of the technologies identified.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-08
... Adoption of Technical Specifications Task Force Traveler TSTF-500, Revision 2, ``DC Electrical Rewrite... Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, ``DC Electrical Rewrite--Update to... Reactor Systems Engineer, Technical Specifications Branch, Mail Stop: O-7 C2A, Division of Inspection and...
10 CFR 76.87 - Technical safety requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Technical safety requirements. 76.87 Section 76.87 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) CERTIFICATION OF GASEOUS DIFFUSION PLANTS Safety § 76.87 Technical safety requirements. (a) The Corporation shall establish technical safety requirements. In...
10 CFR 76.87 - Technical safety requirements.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 2 2012-01-01 2012-01-01 false Technical safety requirements. 76.87 Section 76.87 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) CERTIFICATION OF GASEOUS DIFFUSION PLANTS Safety § 76.87 Technical safety requirements. (a) The Corporation shall establish technical safety requirements. In...
10 CFR 76.87 - Technical safety requirements.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 2 2011-01-01 2011-01-01 false Technical safety requirements. 76.87 Section 76.87 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) CERTIFICATION OF GASEOUS DIFFUSION PLANTS Safety § 76.87 Technical safety requirements. (a) The Corporation shall establish technical safety requirements. In...
10 CFR 76.87 - Technical safety requirements.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 2 2013-01-01 2013-01-01 false Technical safety requirements. 76.87 Section 76.87 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) CERTIFICATION OF GASEOUS DIFFUSION PLANTS Safety § 76.87 Technical safety requirements. (a) The Corporation shall establish technical safety requirements. In...
10 CFR 76.87 - Technical safety requirements.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 2 2014-01-01 2014-01-01 false Technical safety requirements. 76.87 Section 76.87 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) CERTIFICATION OF GASEOUS DIFFUSION PLANTS Safety § 76.87 Technical safety requirements. (a) The Corporation shall establish technical safety requirements. In...
Closed-ecology life support systems /CELSS/ for long-duration, manned missions
NASA Technical Reports Server (NTRS)
Modell, M.; Spurlock, J. M.
1979-01-01
Studies were conducted to scope the principal areas of technology that can contribute to the development of closed-ecology life support systems (CELSS). Such systems may be required for future space activities, such as space stations, manufacturing facilities, or colonies. A major feature of CELSS is the regeneration of food from carbon in waste materials. Several processes, using biological and/or physico-chemical components, have been postulated for closing the recycle loop. At the present time, limits of available technical information preclude the specification of an optimum scheme. Nevertheless, the most significant technical requirements can be determined by way of an iterative procedure of formulating, evaluating and comparing various closed-system scenario. The functions features and applications of this systems engineering procedure are discussed.
10 CFR 830.205 - Technical safety requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... must: (1) Develop technical safety requirements that are derived from the documented safety analysis... 10 Energy 4 2010-01-01 2010-01-01 false Technical safety requirements. 830.205 Section 830.205 Energy DEPARTMENT OF ENERGY NUCLEAR SAFETY MANAGEMENT Safety Basis Requirements § 830.205 Technical...
10 CFR 830.205 - Technical safety requirements.
Code of Federal Regulations, 2011 CFR
2011-01-01
... must: (1) Develop technical safety requirements that are derived from the documented safety analysis... 10 Energy 4 2011-01-01 2011-01-01 false Technical safety requirements. 830.205 Section 830.205 Energy DEPARTMENT OF ENERGY NUCLEAR SAFETY MANAGEMENT Safety Basis Requirements § 830.205 Technical...
NASA Technical Reports Server (NTRS)
Lewis, James L.
2011-01-01
The NASA Docking System (NDS) is NASA's implementation for the emerging International Docking System Standard (IDSS) using low impact docking technology. The NASA Docking System Project (NDSP) is the International Space Station (ISS) Program's project to produce the NDS, Common Docking Adapter (CDA) and Docking Hub. The NDS design evolved from the Low Impact Docking System (LIDS). The acronym international Low Impact Docking System (iLIDS) is also used to describe this system as well as the Government Furnished Equipment (GFE) project designing the NDS for the NDSP. NDS and iLIDS may be used interchangeability. This document will use the acronym iLIDS. Some of the heritage documentation and implementations (e.g., software command names, requirement identification (ID), figures, etc.) used on NDS will continue to use the LIDS acronym. This specification defines the technical requirements for the iLIDS GFE delivered to the NDSP by the iLIDS project. This document contains requirements for two iLIDS configurations, SEZ29101800-301 and SEZ29101800-302. Requirements with the statement, iLIDS shall, are for all configurations. Examples of requirements that are unique to a single configuration may be identified as iLIDS (-301) shall or iLIDS (-302) shall. Furthermore, to allow a requirement to encompass all configurations with an exception, the requirement may be designated as iLIDS (excluding -302) shall. Verification requirements for the iLIDS project are identified in the Verification Matrix (VM) provided in the iLIDS Verification and Validation Document, JSC-63966. The following definitions differentiate between requirements and other statements: Shall: This is the only verb used for the binding requirements. Should/May: These verbs are used for stating non-mandatory goals. Will: This verb is used for stating facts or declaration of purpose. A Definition of Terms table is provided in Appendix B to define those terms with specific tailored uses in this document.
NASA Astrophysics Data System (ADS)
Kuehl, C. Stephen
2003-08-01
Completing its final development and early deployment on the Navy's multi-role aircraft, the F/A-18 E/F Super Hornet, the SHAred Reconnaissance Pod (SHARP) provides the war fighter with the latest digital tactical reconnaissance (TAC Recce) Electro-Optical/Infrared (EO/IR) sensor system. The SHARP program is an evolutionary acquisition that used a spiral development process across a prototype development phase tightly coupled into overlapping Engineering and Manufacturing Development (EMD) and Low Rate Initial Production (LRIP) phases. Under a tight budget environment with a highly compressed schedule, SHARP challenged traditional acquisition strategies and systems engineering (SE) processes. Adopting tailored state-of-the-art systems engineering process models allowd the SHARP program to overcome the technical knowledge transition challenges imposed by a compressed program schedule. The program's original goal was the deployment of digital TAC Recce mission capabilities to the fleet customer by summer of 2003. Hardware and software integration technical challenges resulted from requirements definition and analysis activities performed across a government-industry led Integrated Product Team (IPT) involving Navy engineering and test sites, Boeing, and RTSC-EPS (with its subcontracted hardware and government furnished equipment vendors). Requirements development from a bottoms-up approach was adopted using an electronic requirements capture environment to clarify and establish the SHARP EMD product baseline specifications as relevant technical data became available. Applying Earned-Value Management (EVM) against an Integrated Master Schedule (IMS) resulted in efficiently managing SE task assignments and product deliveries in a dynamically evolving customer requirements environment. Application of Six Sigma improvement methodologies resulted in the uncovering of root causes of errors in wiring interconnectivity drawings, pod manufacturing processes, and avionics requirements specifications. Utilizing the draft NAVAIR SE guideline handbook and the ANSI/EIA-632 standard: Processes for Engineering a System, a systems engineering tailored process approach was adopted for the accelerated SHARP EMD prgram. Tailoring SE processes in this accelerated product delivery environment provided unique opportunities to be technically creative in the establishment of a product performance baseline. This paper provides an historical overview of the systems engineering activities spanning the prototype phase through the EMD SHARP program phase, the performance requirement capture activities and refinement process challenges, and what SE process improvements can be applied to future SHARP-like programs adopting a compressed, evolutionary spiral development acquisition paradigm.
48 CFR 252.246-7001 - Warranty of data.
Code of Federal Regulations, 2011 CFR
2011-10-01
... calibration procedures under MIL-T-31000, General Specification for Technical Data Packages, Amendment 1, or MIL-T-47500, General Specification for Technical Data Packages, Supp 1, or drawings and associated... Specification for Technical Data Packages, Amendment 1, or MIL-T-47500, General Specification for Technical Data...
48 CFR 252.246-7001 - Warranty of data.
Code of Federal Regulations, 2014 CFR
2014-10-01
... calibration procedures under MIL-T-31000, General Specification for Technical Data Packages, Amendment 1, or MIL-T-47500, General Specification for Technical Data Packages, Supp 1, or drawings and associated... Specification for Technical Data Packages, Amendment 1, or MIL-T-47500, General Specification for Technical Data...
48 CFR 252.246-7001 - Warranty of data.
Code of Federal Regulations, 2013 CFR
2013-10-01
... calibration procedures under MIL-T-31000, General Specification for Technical Data Packages, Amendment 1, or MIL-T-47500, General Specification for Technical Data Packages, Supp 1, or drawings and associated... Specification for Technical Data Packages, Amendment 1, or MIL-T-47500, General Specification for Technical Data...
48 CFR 252.246-7001 - Warranty of data.
Code of Federal Regulations, 2010 CFR
2010-10-01
... calibration procedures under MIL-T-31000, General Specification for Technical Data Packages, Amendment 1, or MIL-T-47500, General Specification for Technical Data Packages, Supp 1, or drawings and associated... Specification for Technical Data Packages, Amendment 1, or MIL-T-47500, General Specification for Technical Data...
48 CFR 252.246-7001 - Warranty of data.
Code of Federal Regulations, 2012 CFR
2012-10-01
... calibration procedures under MIL-T-31000, General Specification for Technical Data Packages, Amendment 1, or MIL-T-47500, General Specification for Technical Data Packages, Supp 1, or drawings and associated... Specification for Technical Data Packages, Amendment 1, or MIL-T-47500, General Specification for Technical Data...
Cho, Jin-Hyung; Park, Wonse; Park, Kyeong-Mee; Kim, Seo-Yul
2017-01-01
Digital dentistry has influenced many dental procedures, such as three-dimensional (3D) diagnosis and treatment planning, surgical splints, and prosthetic treatments. Patient-specific protective appliances (PSPAs) prevent dental injury during endotracheal intubation. However, the required laboratory work takes time, and there is the possibility of tooth extraction while obtaining the dental impression. In this technical report, we utilized new digital technology for creating PSPAs, using direct intraoral scanners and 3D printers for dental cast fabrication. PMID:28879329
Cho, Jin-Hyung; Park, Wonse; Park, Kyeong-Mee; Kim, Seo-Yul; Kim, Kee-Deog
2017-03-01
Digital dentistry has influenced many dental procedures, such as three-dimensional (3D) diagnosis and treatment planning, surgical splints, and prosthetic treatments. Patient-specific protective appliances (PSPAs) prevent dental injury during endotracheal intubation. However, the required laboratory work takes time, and there is the possibility of tooth extraction while obtaining the dental impression. In this technical report, we utilized new digital technology for creating PSPAs, using direct intraoral scanners and 3D printers for dental cast fabrication.
Code of Federal Regulations, 2011 CFR
2011-10-01
... full and open competition, such as: (i) Explanation of why technical data packages, specifications... COMPETITION REQUIREMENTS Other Than Full and Open Competition 6.303-2 Content. (a) Each justification shall... than full and open competition.” (2) Nature and/or description of the action being approved. (3) A...
20 CFR 632.78 - Training activities.
Code of Federal Regulations, 2012 CFR
2012-04-01
... determined by representatives of the Indian and Native American communities and groups served (sec. 401(a... the technical skills and information required to perform a specific job or group of jobs. It may be...) Job development; (4) Job search assistance. This includes transition services, such as job seeking...
48 CFR 927.404-70 - Statutory programs.
Code of Federal Regulations, 2010 CFR
2010-10-01
... from public disclosure specific data first produced in the performance of the contract. Examples of... CONTRACTING REQUIREMENTS PATENTS, DATA, AND COPYRIGHTS Technical Data and Copyrights 927.404-70 Statutory... the data in accordance with the statute. Generally, such clauses will be based upon the Rights in Data...
48 CFR 927.404-70 - Statutory programs.
Code of Federal Regulations, 2014 CFR
2014-10-01
... from public disclosure specific data first produced in the performance of the contract. Examples of... CONTRACTING REQUIREMENTS PATENTS, DATA, AND COPYRIGHTS Technical Data and Copyrights 927.404-70 Statutory... the data in accordance with the statute. Generally, such clauses will be based upon the Rights in Data...
48 CFR 927.404-70 - Statutory programs.
Code of Federal Regulations, 2011 CFR
2011-10-01
... from public disclosure specific data first produced in the performance of the contract. Examples of... CONTRACTING REQUIREMENTS PATENTS, DATA, AND COPYRIGHTS Technical Data and Copyrights 927.404-70 Statutory... the data in accordance with the statute. Generally, such clauses will be based upon the Rights in Data...
A Hierarchy of Management Training Requirements: The Competency Domain Model.
ERIC Educational Resources Information Center
Sandwith, Paul
1993-01-01
The Competency Domain Model has five domains of management competencies: conceptual/creative, leadership, interpersonal, administrative, and technical. Specific competencies and training plans can be identified in each domain for different levels--first line supervisor, field office manager, assistant manager, area manager, director of operations.…
20 CFR 632.78 - Training activities.
Code of Federal Regulations, 2010 CFR
2010-04-01
... determined by representatives of the Indian and Native American communities and groups served (sec. 401(a... the technical skills and information required to perform a specific job or group of jobs. It may be... world of work; (2) Counseling. This includes employment and training related counseling and testing; (3...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Weber, E.R.
1980-07-01
This specification defines the system and subsystem characteristics, design requirements, and system environmental requirements for the Saguaro Power Plant Solar Repowering Project. This project involves the solar repowering of all (120.2 MWe gross) of the 115 MWe net power No. One steam-Rankine unit of the Arizona Public Service Company's Saguaro station. The receiver heat transport fluid is draw salt (60% sodium nitrate and 40% potassium nitrate) that is also used to provide 3.8 hours of sensible heat thermal energy storage. The quad-cavity type receiver is mounted on a tower within a single surrounding collector field of 10,500 second generation heliostats.
NASA Technical Reports Server (NTRS)
Jester, Peggy L.; Lee, Jeffrey; Zukor, Dorothy J. (Technical Monitor)
2001-01-01
This document addresses the software requirements of the Geoscience Laser Altimeter System (GLAS) Standard Data Software (SDS) supporting the GLAS instrument on the EOS ICESat Spacecraft. This Software Requirements Document represents the initial collection of the technical engineering information for the GLAS SDS. This information is detailed within the second of four main volumes of the Standard documentation, the Product Specification volume. This document is a "roll-out" from the governing volume outline containing the Concept and Requirements sections.
NASA Software Documentation Standard
NASA Technical Reports Server (NTRS)
1991-01-01
The NASA Software Documentation Standard (hereinafter referred to as "Standard") is designed to support the documentation of all software developed for NASA; its goal is to provide a framework and model for recording the essential information needed throughout the development life cycle and maintenance of a software system. The NASA Software Documentation Standard can be applied to the documentation of all NASA software. The Standard is limited to documentation format and content requirements. It does not mandate specific management, engineering, or assurance standards or techniques. This Standard defines the format and content of documentation for software acquisition, development, and sustaining engineering. Format requirements address where information shall be recorded and content requirements address what information shall be recorded. This Standard provides a framework to allow consistency of documentation across NASA and visibility into the completeness of project documentation. The basic framework consists of four major sections (or volumes). The Management Plan contains all planning and business aspects of a software project, including engineering and assurance planning. The Product Specification contains all technical engineering information, including software requirements and design. The Assurance and Test Procedures contains all technical assurance information, including Test, Quality Assurance (QA), and Verification and Validation (V&V). The Management, Engineering, and Assurance Reports is the library and/or listing of all project reports.
NASA Technical Reports Server (NTRS)
Fura, David A.; Windley, Phillip J.; Cohen, Gerald C.
1993-01-01
This technical report contains the HOL listings of the specification of the design and major portions of the requirements for a commercially developed processor interface unit (or PIU). The PIU is an interface chip performing memory interface, bus interface, and additional support services for a commercial microprocessor within a fault-tolerant computer system. This system, the Fault-Tolerant Embedded Processor (FTEP), is targeted towards applications in avionics and space requiring extremely high levels of mission reliability, extended maintenance-free operation, or both. This report contains the actual HOL listings of the PIU specification as it currently exists. Section two of this report contains general-purpose HOL theories that support the PIU specification. These theories include definitions for the hardware components used in the PIU, our implementation of bit words, and our implementation of temporal logic. Section three contains the HOL listings for the PIU design specification. Aside from the PIU internal bus (I-Bus), this specification is complete. Section four contains the HOL listings for a major portion of the PIU requirements specification. Specifically, it contains most of the definition for the PIU behavior associated with memory accesses initiated by the local processor.
75 FR 27273 - Hazardous Materials; Packages Intended for Transport by Aircraft
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-14
...PHMSA proposes to amend requirements in the Hazardous Materials Regulations to enhance the integrity of inner packagings or receptacles of combination packagings containing liquid hazardous material by ensuring they remain intact when subjected to the reduced pressure and other forces encountered in air transportation. In order to substantially decrease the likelihood of a hazardous materials release, the proposed amendments: prescribe specific test protocols and standards for determining whether an inner packaging or receptacle is capable of meeting the pressure differential requirements specified in the regulations and, consistent with the 2011-2012 edition of the International Civil Aviation Organization Technical Instructions for the Safe Transport of Dangerous Goods by Aircraft (ICAO Technical Instructions), require the closures on all inner packagings containing liquids within a combination packaging to be secured by a secondary means or, under certain circumstances, permit the use of a liner.
Lithographic Stripping; Printing 2: 9755.03.
ERIC Educational Resources Information Center
Dade County Public Schools, Miami, FL.
The course is one of a group which provides 11th grade students with the general information, technical knowledge, basic skills, attitudes, and values required for job entry level in printing. The course is 90 hours in length. Course content includes goals, specific objectives, orientation, safety in the stripping department, and a stripping…
Automotive Body Fillers; Auto Body Repair and Refinishing 2: 9035.03.
ERIC Educational Resources Information Center
Dade County Public Schools, Miami, FL.
This course provides students with the general information, technical knowledge, basic skills, attitudes, and values required for job entry level as an auto body repair helper. Course content includes goals, specific objectives, orientation, filling with body solder, and plastic filler. A post-test sample is appended. (NH)
Platemaking; Printing 2: 9755.04.
ERIC Educational Resources Information Center
Dade County Public Schools, Miami, FL.
The course is one of a group which provides 11th grade students with the general information, technical knowledge, basic skills, attitudes, and values required for job entry level in the printing industry. Course content includes goals, specific objectives, orientation, types of lithographic plates, surface plates for offset, wipe-on plates,…
40 CFR 1700.10 - No-discharge zones by EPA prohibition.
Code of Federal Regulations, 2010 CFR
2010-07-01
... topographic quadrant map, clearly marking the zone boundaries by latitude and longitude. (3) A technical analysis showing why protection and enhancement of the waters described in paragraph (a)(2) of this section require a prohibition of the discharge. The analysis must provide specific information on why the...
40 CFR 161.160 - Description of materials used to produce the product.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Chemistry Data Requirements § 161.160 Description of materials used to produce the product. The following... composition (and, if requested by the Agency, chemical and physical properties) of the ingredient, including a..., chemical or physical properties) of the starting material, including a copy of all technical specifications...
40 CFR 161.160 - Description of materials used to produce the product.
Code of Federal Regulations, 2012 CFR
2012-07-01
... Chemistry Data Requirements § 161.160 Description of materials used to produce the product. The following... composition (and, if requested by the Agency, chemical and physical properties) of the ingredient, including a..., chemical or physical properties) of the starting material, including a copy of all technical specifications...
40 CFR 161.160 - Description of materials used to produce the product.
Code of Federal Regulations, 2013 CFR
2013-07-01
... Chemistry Data Requirements § 161.160 Description of materials used to produce the product. The following... composition (and, if requested by the Agency, chemical and physical properties) of the ingredient, including a..., chemical or physical properties) of the starting material, including a copy of all technical specifications...
40 CFR 161.160 - Description of materials used to produce the product.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Chemistry Data Requirements § 161.160 Description of materials used to produce the product. The following... composition (and, if requested by the Agency, chemical and physical properties) of the ingredient, including a..., chemical or physical properties) of the starting material, including a copy of all technical specifications...
47 CFR 73.319 - FM multiplex subcarrier technical standards.
Code of Federal Regulations, 2010 CFR
2010-10-01
... specific authorization from the FCC provided the generator can be connected to the transmitter without... cease operation. The licensee may be required to verify the corrective measures with supporting data. Such data must be retained at the station and be made available to the FCC upon request. [48 FR 28455...
Laboratory Accreditation Bureau (L-A-B)
2011-03-28
to all Technical Advisors. Must agree with code of conduct, confidentiality and our mission DoD ELAP Program ISO / IEC 17025 :2005 and DoD QSM...Additional DoD QSM requirements fit well in current 17025 process … just much, much more. Sector Specific. Outcome (L-A-B case) 83
33 CFR 385.5 - Guidance memoranda.
Code of Federal Regulations, 2010 CFR
2010-07-01
... sources of water will occur as a result of implementation of the Plan (§ 385.36(b)). (b) Special processes..., implementation, and management of one specific individual feature of the Plan, this section does not require... § 385.5 Guidance memoranda. (a) General. (1) Technical guidance for internal management of Corps of...
33 CFR 157.12d - Technical specifications.
Code of Federal Regulations, 2014 CFR
2014-07-01
... section. The sampling probes located in the overboard discharge lines and the piping system connecting the sampling probes to the oil content meter must meet the requirements of this paragraph. (2) The piping and probes must be— (i) Of a material resistant to fire, corrosion, and oil; and (ii) Of adequate strength...
47 CFR 95.1115 - General technical requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
...) In the 1395-1400 MHz and 1427-1432 MHz bands, no specific channels are specified. Wireless medical telemetry devices may operate on any channel within the bands authorized for wireless medical telemetry use in this part. (2) In the 608-614 MHz band, wireless medical telemetry devices utilizing broadband...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-26
... addition, the requestor/petitioner shall provide a brief explanation of the bases for the contention and a..., malfunctions, or accident initiators not considered in the design and licensing bases. The proposed amendment... technical specifications (TSs) requirements related to primary containment isolation instrumentation in...
Telecom Link--A Competitive Simulated Design Exercise.
ERIC Educational Resources Information Center
Freeman, J.; Allen, J.
1982-01-01
Telecom link is a structured design exercise concerned with building a telecommunications link between London and Amsterdam. Designed for A-level physics, the simulation requires a minimum of 10 hours. Aims of the exercise, design specifications and technical aspects, and summaries of four possible technologies used in the simulation are…
Performance Standards for Secondary School Vocational Education. Background Paper.
ERIC Educational Resources Information Center
Congress of the U.S., Washington, DC. Office of Technology Assessment.
To assist Congress in preparing for the reauthorization of the Carl D. Perkins Vocational Education Act, the Office of Technology Assessment (OTA) examined the technical feasibility and utility of instituting specific requirements for performance measurement of secondary school vocational programs. The OTA examined two types of performance…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-30
.../diminished. There are no design changes associated with this TS amendment. The DC power system/batteries will... changes restructure the Technical Specifications (TS) for the direct current (DC) electrical power system... battery and battery charger operability requirements. The DC electrical power system, including associated...
10 CFR 50.36 - Technical specifications.
Code of Federal Regulations, 2010 CFR
2010-01-01
..., or component that is part of the primary success path and which functions or actuates to mitigate a... significant safety functions. Where a limiting safety system setting is specified for a variable on which a... the automatic safety system does not function as required, the licensee shall take appropriate action...
A Strategy for Efficiently Verifying Requirements Specifications Using Composition and Invariants
2003-09-05
Colle - sur - Loup , France, Oct. 1984. Springer-Verlag. [34] J. Ramish. Empirical studies of compositional abstraction. Technical report, Naval Research...global to modular temporal rea- soning about programs. In K. R. Apt, editor, Proc. NATO Adv. Study Inst. on Logics and Models of Concurrent Systems, La
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-30
... Standard Technical Specification (STS): NUREG-1432, ``Standard Technical Specifications Combustion..., Washington, DC 20555- 0001. SUPPLEMENTARY INFORMATION: TSTF-426, Revision 5, is applicable to all Combustion...
Technical Support Document for Version 3.4.0 of the COMcheck Software
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bartlett, Rosemarie; Connell, Linda M.; Gowri, Krishnan
2007-09-14
COMcheck provides an optional way to demonstrate compliance with commercial and high-rise residential building energy codes. Commercial buildings include all use groups except single family and multifamily not over three stories in height. COMcheck was originally based on ANSI/ASHRAE/IES Standard 90.1-1989 (Standard 90.1-1989) requirements and is intended for use with various codes based on Standard 90.1, including the Codification of ASHRAE/IES Standard 90.1-1989 (90.1-1989 Code) (ASHRAE 1989a, 1993b) and ASHRAE/IESNA Standard 90.1-1999 (Standard 90.1-1999). This includes jurisdictions that have adopted the 90.1-1989 Code, Standard 90.1-1989, Standard 90.1-1999, or their own code based on one of these. We view Standard 90.1-1989more » and the 90.1-1989 Code as having equivalent technical content and have used both as source documents in developing COMcheck. This technical support document (TSD) is designed to explain the technical basis for the COMcheck software as originally developed based on the ANSI/ASHRAE/IES Standard 90.1-1989 (Standard 90.1-1989). Documentation for other national model codes and standards and specific state energy codes supported in COMcheck has been added to this report as appendices. These appendices are intended to provide technical documentation for features specific to the supported codes and for any changes made for state-specific codes that differ from the standard features that support compliance with the national model codes and standards.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Laney, T.
The configuration management architecture presented in this Configuration Management Plan is based on the functional model established by DOE-STD-1073-93, ``Guide for Operational Configuration Management Program.`` The DOE Standard defines the configuration management program by the five basic program elements of ``program management,`` ``design requirements,`` ``document control,`` ``change control,`` and ``assessments,`` and the two adjunct recovery programs of ``design reconstitution,`` and ``material condition and aging management.`` The CM model of five elements and two adjunct programs strengthen the necessary technical and administrative control to establish and maintain a consistent technical relationship among the requirements, physical configuration, and documentation. Although the DOEmore » Standard was originally developed for the operational phase of nuclear facilities, this plan has the flexibility to be adapted and applied to all life-cycle phases of both nuclear and non-nuclear facilities. The configuration management criteria presented in this plan endorses the DOE Standard and has been tailored specifically to address the technical relationship of requirements, physical configuration, and documentation during the full life cycle of the Waste Tank Farms and 242-A Evaporator of Tank Waste Remediation System.« less
Technical approach to groundwater restoration. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-11-01
The Technical Approach to Groundwater Restoration (TAGR) provides general technical guidance to implement the groundwater restoration phase of the Uranium Mill Tailings Remedial Action (UMTRA) Project. The TAGR includes a brief overview of the surface remediation and groundwater restoration phases of the UMTRA Project and describes the regulatory requirements, the National Environmental Policy Act (NEPA) process, and regulatory compliance. A section on program strategy discusses program optimization, the role of risk assessment, the observational approach, strategies for meeting groundwater cleanup standards, and remedial action decision-making. A section on data requirements for groundwater restoration evaluates the data quality objectives (DQO) andmore » minimum data required to implement the options and comply with the standards. A section on sits implementation explores the development of a conceptual site model, approaches to site characterization, development of remedial action alternatives, selection of the groundwater restoration method, and remedial design and implementation in the context of site-specific documentation in the site observational work plan (SOWP) and the remedial action plan (RAP). Finally, the TAGR elaborates on groundwater monitoring necessary to evaluate compliance with the groundwater cleanup standards and protection of human health and the environment, and outlines licensing procedures.« less
How to develop and write a case for technical writing
NASA Technical Reports Server (NTRS)
Couture, B.; Goldstein, J.
1981-01-01
Case of different sizes and shapes for teaching technical writing to engineers at Wayne State University have been developed. The case approach was adopted for some assignments because sophomores and juniors lacked technical expertise and professional knowledge of the engineering world. Cases were found to be good exercises, providing realistic practice in specific writing tasks or isolating particular skills in the composing process. A special kind of case which narrates the experiences of one technical person engaged in the problem-solving process in a professional rhetorical situation was developed. This type of long, realistic fiction is called a an "holistic" case. Rather than asking students to role-play a character, an holistic case realistically encompasses the whole of the technical writing process. It allows students to experience the total communication act in which the technical task and data are fully integrated into the rhetorical situation and gives an opportunity to perform in a realistic context, using skills and knowledge required in communication on the job. It is believed that the holistic case most fully exploits the advantages of the case method for students of professional communication.
Small Business Innovation Research. Program solicitation. Closing date: July 22, 1988
NASA Technical Reports Server (NTRS)
1988-01-01
The sixth annual Small Business Innovation Research (SBIR) solicitation by NASA, describes the program, identifies eligibility requirements, outlines proposal preparation and submission requirements, describes the proposal evaluation and award selection process, and provides other information to assist those interested in participating in the SBIR program. It also identifies in Section 8.0 and Appendix D, the specific technical topics and subtopics in which SBIR Phase 1 proposals are solicited in 1988.
2002 Controls Design Challenge
NASA Technical Reports Server (NTRS)
Hess, Ronald A.; Vetter, T. K.; Wells, S. R.
2002-01-01
This document is intended to provide the specifications and requirements for a flight control system design challenge. The response to the challenge will involve documenting whether the particular design has met the stated requirements through analysis and computer simulation. The response should be written in the general format of a technical publication with corresponding length limits, e.g., an approximate maximum length of 45 units, with each full-size figure and double-spaced typewritten page constituting one unit.
Standard for Models and Simulations
NASA Technical Reports Server (NTRS)
Steele, Martin J.
2016-01-01
This NASA Technical Standard establishes uniform practices in modeling and simulation to ensure essential requirements are applied to the design, development, and use of models and simulations (MS), while ensuring acceptance criteria are defined by the program project and approved by the responsible Technical Authority. It also provides an approved set of requirements, recommendations, and criteria with which MS may be developed, accepted, and used in support of NASA activities. As the MS disciplines employed and application areas involved are broad, the common aspects of MS across all NASA activities are addressed. The discipline-specific details of a given MS should be obtained from relevant recommended practices. The primary purpose is to reduce the risks associated with MS-influenced decisions by ensuring the complete communication of the credibility of MS results.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gauglitz, Phillip A.; Bontha, Jagannadha R.; Daniel, Richard C.
The Hanford Waste Treatment and Immobilization Plant (WTP) is currently being designed and constructed to pretreat and vitrify a large portion of the waste in the 177 underground waste storage tanks at the Hanford Site. A number of technical issues related to the design of the pretreatment facility (PTF) of the WTP have been identified. These issues must be resolved prior to the U.S. Department of Energy (DOE) Office of River Protection (ORP) reaching a decision to proceed with engineering, procurement, and construction activities for the PTF. One of the issues is Technical Issue T1 - Hydrogen Gas Release frommore » Vessels (hereafter referred to as T1). The focus of T1 is identifying controls for hydrogen release and completing any testing required to close the technical issue. In advance of selecting specific controls for hydrogen gas safety, a number of preliminary technical studies were initiated to support anticipated future testing and to improve the understanding of hydrogen gas generation, retention, and release within PTF vessels. These activities supported the development of a plan defining an overall strategy and approach for addressing T1 and achieving technical endpoints identified for T1. Preliminary studies also supported the development of a test plan for conducting testing and analysis to support closing T1. Both of these plans were developed in advance of selecting specific controls, and in the course of working on T1 it was decided that the testing and analysis identified in the test plan were not immediately needed. However, planning activities and preliminary studies led to significant technical progress in a number of areas. This report summarizes the progress to date from the preliminary technical studies. The technical results in this report should not be used for WTP design or safety and hazards analyses and technical results are marked with the following statement: “Preliminary Technical Results for Planning – Not to be used for WTP Design or Safety Analyses.”« less
Approach to the E-ELT dome and main structure challenges
NASA Astrophysics Data System (ADS)
Bilbao, Armando; Murga, Gaizka; Gómez, Celia; Llarena, Javier
2014-07-01
The E-ELT as a whole could be classified as an extremely challenging project. More precisely, it should be defined as an array of many different sub-challenges, which comprise technical, logistical and managerial matters. This paper reviews some of these critical challenges, in particular those related to the Dome and the Main Structure, suggesting ways to face them in the most pragmatic way possible. Technical challenges for the Dome and the Main Structure are mainly related to the need to upscale current design standards to an order of magnitude larger design. Trying a direct design escalation is not feasible; it would not work. A design effort is needed to cross hybridize current design standards with technologies coming from other different applications. Innovative design is therefore not a wish but a must. And innovative design comes along with design risk. Design risk needs to be tackled from two angles: on the one hand through thorough design validation analysis and on the other hand through extensive pre-assembly and testing. And, once again, full scale integrated pre-assembly and testing of extremely large subsystems is not always possible. Therefore, defining a comprehensive test plan for critical components, critical subsystems and critical subassemblies becomes essential. Logistical challenges are linked to the erection site. Cerro Armazones is a remote site and this needs to be considered when evaluating transport and erection requirements. But it is not only the remoteness of the site that needs to be considered. The size of both Dome and Main Structure require large construction cranes and a well defined erection plan taking into account pre-assembly strategies, limited plan area utilization, erection sequence, erection stability during intermediate stages and, very specifically, efficient coordination between the Dome and the Main Structure erection processes. Managerial issues pose another set of challenges in this project. Both the size of the project and its special technical characteristics require specific managerial skills. Due to the size of the project it becomes essential to effectively manage and integrate a large number of suppliers and fabricators, of very different nature and geographically distributed. Project management plans need to cope with this situation. Also, extensive on site activities require intensive on site organization in line with large construction management strategies. Finally, the technical edge of the project requires deep technical understanding at management level in order to be able to take sound strategic decisions throughout the project in terms of the overall project quality, cost and schedule.
Bru, Juan; Berger, Christopher A
2012-01-01
Background Point-of-care electronic medical records (EMRs) are a key tool to manage chronic illness. Several EMRs have been developed for use in treating HIV and tuberculosis, but their applicability to primary care, technical requirements and clinical functionalities are largely unknown. Objectives This study aimed to address the needs of clinicians from resource-limited settings without reliable internet access who are considering adopting an open-source EMR. Study eligibility criteria Open-source point-of-care EMRs suitable for use in areas without reliable internet access. Study appraisal and synthesis methods The authors conducted a comprehensive search of all open-source EMRs suitable for sites without reliable internet access. The authors surveyed clinician users and technical implementers from a single site and technical developers of each software product. The authors evaluated availability, cost and technical requirements. Results The hardware and software for all six systems is easily available, but they vary considerably in proprietary components, installation requirements and customisability. Limitations This study relied solely on self-report from informants who developed and who actively use the included products. Conclusions and implications of key findings Clinical functionalities vary greatly among the systems, and none of the systems yet meet minimum requirements for effective implementation in a primary care resource-limited setting. The safe prescribing of medications is a particular concern with current tools. The dearth of fully functional EMR systems indicates a need for a greater emphasis by global funding agencies to move beyond disease-specific EMR systems and develop a universal open-source health informatics platform. PMID:22763661
2004-06-17
The rule makes technical changes to the Healthcare Integrity and Protection Data Bank (HIPDB) data collection reporting requirements set forth in 45 CFR part 61 by clarifying the types of personal numeric identifiers that may be reported to the data bank in connection with adverse actions. Specifically, the rule clarifies that in lieu of a Social Security Number (SSN), an individual taxpayer identification number (ITIN) may be reported to the data bank when, in those limited situations, an individual does not have an SSN.
Savel, Craig; Mierzwa, Stan; Gorbach, Pamina M; Souidi, Samir; Lally, Michelle; Zimet, Gregory; Interventions, Aids
2016-01-01
This paper reports on a specific Web-based self-report data collection system that was developed for a public health research study in the United States. Our focus is on technical outcome results and lessons learned that may be useful to other projects requiring such a solution. The system was accessible from any device that had a browser that supported HTML5. Report findings include: which hardware devices, Web browsers, and operating systems were used; the rate of survey completion; and key considerations for employing Web-based surveys in a clinical trial setting.
Using of Aerogel to Improve Thermal Insulating Properties of Windows
NASA Astrophysics Data System (ADS)
Valachova, Denisa; Zdrazilova, Nada; Panovec, Vladan; Skotnicova, Iveta
2018-06-01
For the best possible thermal-technical properties of building structures it is necessary to use materials with very low thermal conductivity. Due to the increasing thermal-technical requirements for building structures, the insulating materials are developed. One of the modern thermal insulating materials is so-called aerogel. Unfortunately, this material is not used in the field of external thermal insulation composite systems because of its price and its properties. The aim of this paper is to present possibilities of using this insulating material in the civil engineering - specifically a usage of aerogel in the production of windows.
Learning Soft Skills at Work: An Interview with Annalee Luhman
ERIC Educational Resources Information Center
Davis, Barbara D.; Muir, Clive
2004-01-01
Soft skills are attitudes and behaviors displayed in interactions among individuals that affect the outcomes of such encounters. These differ from hard skills, which are the technical knowledge and abilities required to perform specific job-related tasks more formally stated in job descriptions. In the past, it was felt that managers and employees…
Auto Body Repair and Refinishing 2; Automotive Refinishing 1: 9035.04.
ERIC Educational Resources Information Center
Dade County Public Schools, Miami, FL.
This course will provide the student with the general information, technical knowledge, basic skills, attitudes and values required for job entry as an auto body repair helper. Course content includes goals, specific objectives, orientation, service tools and bench skills, paint spray equipment, paint materials, and preparation of automobile body…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-02
... support unlisted software, and the NRC Meta System Help Desk will not be able to offer assistance in using... supported Technical Specification (TS) systems inoperable when the associated snubber(s) cannot perform its... allowed before declaring a TS supported system inoperable and taking its Conditions and Required Actions...
An Inquiry into the Development of Future Speech-Language Pathologists: A Mixed Methods Study
ERIC Educational Resources Information Center
Plotts, Kimberly P.
2017-01-01
Upon graduating college, many students seek employment within the degree area in which they obtained. Employers are seeking skills in individuals that encompass interpersonal, technical, analytical, personal, and professional abilities. As with many careers, the allied health field requires content specific knowledge and specialized skills, which…
ERIC Educational Resources Information Center
Bureau of Labor Statistics (DOL), Washington, DC.
Selected from the "Occupational Outlook Handbook," the listings included in this document represent a number of occupations for which junior college or other special training is useful. Each listing, grouped under a broader occupational area, provides a specific occupational title, number employed in the occupation in 1974, qualifications and…
An Experiment in Teaching Invention
ERIC Educational Resources Information Center
Clark, Andre
2009-01-01
Purpose: The purpose of this paper is to demonstrate that invention can be taught to business students who do not have the prior technical knowledge that is assumed to be a requirement for this kind of activity. Design/methodology/approach: This paper contains reflections on the results of introducing a specific course in inventing based on the…
47 CFR 15.611 - General technical requirements.
Code of Federal Regulations, 2011 CFR
2011-10-01
... spectrum by licensed services. These techniques may include adaptive or “notch” filtering, or complete... frequencies below 30 MHz, when a notch filter is used to avoid interference to a specific frequency band, the... below the applicable part 15 limits. (ii) For frequencies above 30 MHz, when a notch filter is used to...
Non-Technical Skills in Undergraduate Degrees in Business: Development and Transfer
ERIC Educational Resources Information Center
Jackson, Denise; Hancock, Phil
2010-01-01
The development of discipline-specific skills and knowledge is no longer considered sufficient in graduates of Bachelor level degrees in Business. Higher education providers are becoming increasingly responsible for the development of a generic skill set deemed essential in undergraduates. This required skill set comprises a broad range of…
Sensors Technology and Advanced Signal Processing Concepts for Layered Warfare/Layered Sensing
2010-04-01
for challenged environments will require contributions from many diverse technical disciplines across AFRL, the Air Force and beyond. By providing a...APPROVED FOR PUBLIC RELEASE; DISTRIBUTION UNLIMITED. STINFO COPY AIR FORCE...UNITED STATES AIR FORCE AIR FORCE MATERIEL COMMAND NOTICE AND SIGNATURE PAGE Using Government drawings, specifications, or other data
Task Analysis for Curriculum Design and Validation. Allied Health Professions Project.
ERIC Educational Resources Information Center
Byers, Bruce B.; And Others
This report contains an outline of the method and the rationale for a project whose purpose is to develop training programs which are relevant to the specific requirements of technical occupations in nine allied health professions. The nine professions are in (a) nursing, (b) inhalation therapy, (c) radiology (technician level), (d) clinical…
TOPEX SDR Processing, October 1998. Volume 4
NASA Technical Reports Server (NTRS)
Lee, Jeffrey E.; Lockwood, Dennis W.
2003-01-01
This document is a compendium of the WFF TOPEX Software Development Team's knowledge regarding Sensor Data Record (SDR) Processing. It includes many elements of a requirements document, a software specification document, a software design document, and a user's manual. In the more technical sections, this document assumes the reader is familiar with TOPEX and instrument files.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Shrivastava, V.K.
1992-01-01
The new impending environmental law in Poland provides for strict environmental guidelines for coal preparation, washing, mine desalination, and application of commercially viable and economical clean coal technologies for utilization of coal. The government of Poland requested the U.S. Trade and Development Program (TDP) carry out a Definitional Mission to Poland to define the requirements of the Polish authorities and to prepare specific recommendations for follow on actions by TDP. The technical assistance package proposed to be funded by TDP includes two specific activities. These are (i) an orientation visit to review selected clean coal technology projects in the U.S.,more » and (ii) preparation of a compendium of the main coal sector requirements in Poland and the types of technologies needed. The Definitional Mission has prepared a Scope of Work which recommends that TDP allocate a fund to finance the cost of the above technical assistance activities. It is further recommended that TDP enlist the assistance of a non-profit trade organization to provide this assistance to the Polish government.« less
Security challenges in integration of a PHR-S into a standards based national EHR.
Mense, Alexander; Hoheiser Pförtner, Franz; Sauermann, Stefan
2014-01-01
Health related data provided by patients themselves is expected to play a major role in future healthcare. Data from personal health devices, vaccination records, health diaries or observations of daily living, for instance, is stored in personal health records (PHR) which are maintained by personal health record systems (PHR-S). Combining this information with medical records provided by healthcare providers in electronic health records (EHR) is one of the next steps towards "personal care". Austria currently sets up a nationwide EHR system that incorporates all healthcare providers and is technically based on international standards (IHE, HL7, OASIS, ...). Looking at the expected potential of merging PHR and EHR data it is worth to analyse integration approaches. Although knowing that an integration requires the coordination of processes, information models and technical architectures, this paper specifically focuses on security issues by evaluating general security requirements for a PHR-S (based on HL7 PHR-S FM), comparing them with the information security specifications for the Austrian's national EHR (based on ISO/IES 27000 series) and identifying the main challenges as well as possible approaches.
Zhang, Bin; Gurnaney, Harshad G; Stricker, Paul A; Galvez, Jorge A; Isserman, Rebecca S; Fiadjoe, John E
2018-05-09
The GlideScope Cobalt is one of the most commonly used videolaryngoscopes in pediatric anesthesia. Although visualization of the airway may be superior to direct laryngoscopy, users need to learn a new indirect way to insert the tracheal tube. Learning this indirect approach requires focused practice and instruction. Identifying the specific points during tube placement, during which clinicians struggle, would help with targeted education. We conducted this prospective observational study to determine the incidence and location of technical difficulties using the GlideScope, the success rates of various corrective maneuvers used, and the impact of technical difficulty on success rate. We conducted this observational study at our quaternary pediatric hospital between February 2014 and August 2014. We observed 200 GlideScope-guided intubations and documented key intubation-related outcomes. Inclusion criteria for patients were <6 years of age and elective surgery requiring endotracheal intubation. We documented the number of advancement maneuvers required to intubate the trachea, the location where technical difficulty occurred, the types of maneuvers used to address difficulties, and the tracheal intubation success rate. We used a bias-corrected bootstrapping method with 300 replicates to determine the 95% confidence interval (CI) around the rate of difficulty with an intubation attempt. After excluding attempts by inexperienced clinicians, there were 225 attempts in 187 patients, 58% (131 of 225; bootstrap CI, 51.6%-64.6%]) of the attempts had technical difficulties. Technical difficulty was most likely to occur when inserting the tracheal tube between the plane of the arytenoid cartilages to just beyond the vocal cords: "zone 3." Clockwise rotation of the tube was the most common successful corrective maneuver in zone 3. The overall tracheal intubation success rate was 98% (CI, 95%-99%); however, the first attempt success rate was only 80% (CI, 74%-86%). Patients with technical difficulty had more attempts (median [interquartile range], 2 [1-3] than those without technical difficulty median (interquartile range, 1 [1-1; P value <.01]). A variety of clinicians experience technical difficulties with the GlideScope Cobalt videolaryngoscope in children. These difficulties result in more tracheal intubation attempts, an important risk factor for intubation-associated complications. Targeted education of clinicians may reduce the incidence of technical difficulties.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-25
... Software Developers on the Technical Specifications for Common Formats for Patient Safety Data Collection... designed as an interactive forum where PSOs and software developers can provide input on these technical... updated event descriptions, forms, and technical specifications for software developers. As an update to...
A computer-based specification methodology
NASA Technical Reports Server (NTRS)
Munck, Robert G.
1986-01-01
Standard practices for creating and using system specifications are inadequate for large, advanced-technology systems. A need exists to break away from paper documents in favor of documents that are stored in computers and which are read and otherwise used with the help of computers. An SADT-based system, running on the proposed Space Station data management network, could be a powerful tool for doing much of the required technical work of the Station, including creating and operating the network itself.
Technical aspects of CT imaging of the spine.
Tins, Bernhard
2010-11-01
This review article discusses technical aspects of computed tomography (CT) imaging of the spine. Patient positioning, and its influence on image quality and movement artefact, is discussed. Particular emphasis is placed on the choice of scan parameters and their relation to image quality and radiation burden to the patient. Strategies to reduce radiation burden and artefact from metal implants are outlined. Data acquisition, processing, image display and steps to reduce artefact are reviewed. CT imaging of the spine is put into context with other imaging modalities for specific clinical indications or problems. This review aims to review underlying principles for image acquisition and to provide a rough guide for clinical problems without being prescriptive. Individual practice will always vary and reflect differences in local experience, technical provisions and clinical requirements.
NASA Astrophysics Data System (ADS)
Schmidt, Luke M.; Ribeiro, Rafael; Taylor, Keith; Jones, Damien; Prochaska, Travis; DePoy, Darren L.; Marshall, Jennifer L.; Cook, Erika; Froning, Cynthia; Ji, Tae-Geun; Lee, Hye-In; Mendes de Oliveira, Claudia; Pak, Soojong; Papovich, Casey
2016-08-01
We present a preliminary conceptual optical design for GMACS, a wide field, multi-object, optical spectrograph currently being developed for the Giant Magellan Telescope (GMT). We include details of the optical design requirements derived from the instrument scientific and technical objectives and demonstrate how these requirements are met by the current design. Detector specifications, field acquisition/alignment optics, and optical considerations for the active flexure control system are also discussed.
NASA Technical Reports Server (NTRS)
Johnson, Charles W.
2011-01-01
The vision of the Unmanned Aircraft System (UAS) Integration in the National Airspace System (NAS) Project is "A global transportation system which allows routine access for all classes of UAS." The goal of the UAS Integration in the NAS Project is to "contribute capabilities that reduce technical barriers related to the safety and operational challenges associated with enabling routine UAS access to the NAS." This goal will be accomplished through a two-phased approach based on development of system-level integration of key concepts, technologies and/or procedures, and demonstrations of integrated capabilities in an operationally relevant environment. Phase 1 will take place the first two years of the Project and Phase 2 will take place the following three years. The Phase 1 and 2 technical objectives are: Phase 1: Developing a gap analysis between current state of the art and the Next Generation Air Transportation System (NextGen) UAS Concept of Operations . Validating the key technical areas identified by this Project . Conducting initial modeling, simulation, and flight testing activities . Completing Sub-project Phase 1 deliverables (spectrum requirements, comparative analysis of certification methodologies, etc.) and continue Phase 2 preparation (infrastructure, tools, etc.) Phase 2: Providing regulators with a methodology for developing airworthiness requirements for UAS, and data to support development of certifications standards and regulatory guidance . Providing systems-level, integrated testing of concepts and/or capabilities that address barriers to routine access to the NAS. Through simulation and flight testing, address issues including separation assurance, communications requirements, and human systems integration in operationally relevant environments. The UAS in the NAS Project will demonstrate solutions in specific technology areas, which will address operational/safety issues related to UAS access to the NAS. Since the resource allocation for this Project is limited ($150M over the five years), the focus is on reducing the technical barriers where NASA has unique capabilities. As a result, technical areas, such as Sense and Avoid (SAA) and beyond line of sight command and control will not be addressed. While these are critical barriers to UAS access, currently, there is a great deal of global effort being exercised to address these challenge areas. Instead, specific technology development in areas where there is certainty that NASA can advance the research to high technology readiness levels will be the Project's focus. Specific sub-projects include Separation Assurance, Human Systems Integration, Communications, Certification, and Integrated Test and Evaluation. Each sub-project will transfer technologies to relevant key stakeholders and decision makers through research transition teams, technology forums, or through other analogous means.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-10
... Information Collection: Comment Request; Technical Processing Requirements for Multifamily Project Mortgage... information: Title of Proposal: Technical Processing Requirements for Multifamily Project Mortgage Insurance... information collection requirement described below will be submitted to the Office of Management and Budget...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-11
... NUCLEAR REGULATORY COMMISSION [Project No. 753; NRC-2012-0019] Model Safety Evaluation for Plant... Regulatory Commission (NRC) is announcing the availability of the model safety evaluation (SE) for plant... the Improved Standard Technical Specification (ISTS), NUREG-1431, ``Standard Technical Specifications...
45 CFR 162.920 - Availability of implementation specifications.
Code of Federal Regulations, 2010 CFR
2010-10-01
... implementation specifications and the Technical Reports Type 3 described in subparts I through S of this part... implementation specifications, which include the Technical Reports Type 3 described in this section, for... part 51. The implementation specifications and Technical Reports Type 3 described in this section are...
Technical Support Document for Version 3.9.0 of the COMcheck Software
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bartlett, Rosemarie; Connell, Linda M.; Gowri, Krishnan
2011-09-01
COMcheck provides an optional way to demonstrate compliance with commercial and high-rise residential building energy codes. Commercial buildings include all use groups except single family and multifamily not over three stories in height. COMcheck was originally based on ANSI/ASHRAE/IES Standard 90.1-1989 (Standard 90.1-1989) requirements and is intended for use with various codes based on Standard 90.1, including the Codification of ASHRAE/IES Standard 90.1-1989 (90.1-1989 Code) (ASHRAE 1989a, 1993b) and ASHRAE/IESNA Standard 90.1-1999 (Standard 90.1-1999). This includes jurisdictions that have adopted the 90.1-1989 Code, Standard 90.1-1989, Standard 90.1-1999, or their own code based on one of these. We view Standard 90.1-1989more » and the 90.1-1989 Code as having equivalent technical content and have used both as source documents in developing COMcheck. This technical support document (TSD) is designed to explain the technical basis for the COMcheck software as originally developed based on the ANSI/ASHRAE/IES Standard 90.1-1989 (Standard 90.1-1989). Documentation for other national model codes and standards and specific state energy codes supported in COMcheck has been added to this report as appendices. These appendices are intended to provide technical documentation for features specific to the supported codes and for any changes made for state-specific codes that differ from the standard features that support compliance with the national model codes and standards. Beginning with COMcheck version 3.8.0, support for 90.1-1989, 90.1-1999, and the 1998 IECC are no longer included, but those sections remain in this document for reference purposes.« less
Technical Support Document for Version 3.9.1 of the COMcheck Software
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bartlett, Rosemarie; Connell, Linda M.; Gowri, Krishnan
2012-09-01
COMcheck provides an optional way to demonstrate compliance with commercial and high-rise residential building energy codes. Commercial buildings include all use groups except single family and multifamily not over three stories in height. COMcheck was originally based on ANSI/ASHRAE/IES Standard 90.1-1989 (Standard 90.1-1989) requirements and is intended for use with various codes based on Standard 90.1, including the Codification of ASHRAE/IES Standard 90.1-1989 (90.1-1989 Code) (ASHRAE 1989a, 1993b) and ASHRAE/IESNA Standard 90.1-1999 (Standard 90.1-1999). This includes jurisdictions that have adopted the 90.1-1989 Code, Standard 90.1-1989, Standard 90.1-1999, or their own code based on one of these. We view Standard 90.1-1989more » and the 90.1-1989 Code as having equivalent technical content and have used both as source documents in developing COMcheck. This technical support document (TSD) is designed to explain the technical basis for the COMcheck software as originally developed based on the ANSI/ASHRAE/IES Standard 90.1-1989 (Standard 90.1-1989). Documentation for other national model codes and standards and specific state energy codes supported in COMcheck has been added to this report as appendices. These appendices are intended to provide technical documentation for features specific to the supported codes and for any changes made for state-specific codes that differ from the standard features that support compliance with the national model codes and standards. Beginning with COMcheck version 3.8.0, support for 90.1-1989, 90.1-1999, and the 1998 IECC and version 3.9.0 support for 2000 and 2001 IECC are no longer included, but those sections remain in this document for reference purposes.« less
Publications of the Jet Propulsion Laboratory, January - December 1973. [bibliography
NASA Technical Reports Server (NTRS)
1974-01-01
Five classes of publications are included in this bibliography: (1) Technical Reports in which the information is complete for a specific accomplishment and is intended for a wide audience. (2) Articles from the bimonthly Deep Space Network Progress Report. Each volume's collection of articles presents a periodical survey of current accomplishments by the Deep Space Network. (3) Technical Memorandums, in which the information is complete for a specific accomplishment but is intended for a limited audience to satisfy unique requirements. (4) Articles from the JPL Quarterly Technical Review. Each article summarizes a recent important development, interim or final results, or an advancement in the state of the art in a scientific or engineering endeavor, This publication has been discontinued, and the issues indexed in this bibliography are the last to be published. (5) Articles published in the open literature. The publications are indexed by: (1) author, (2) subject, and (3) publication type and number. A descriptive entry appears under the name of each author of each publication; an abstract is included with the entry for the primary (first-listed) author.
38 CFR 61.52 - Threshold requirements for technical assistance grant applications.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 38 Pensions, Bonuses, and Veterans' Relief 2 2010-07-01 2010-07-01 false Threshold requirements....52 Threshold requirements for technical assistance grant applications. To be eligible for a technical assistance grant, an applicant must meet the following threshold requirements: (a) The application included...
38 CFR 61.52 - Threshold requirements for technical assistance grant applications.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 38 Pensions, Bonuses, and Veterans' Relief 2 2012-07-01 2012-07-01 false Threshold requirements....52 Threshold requirements for technical assistance grant applications. To be eligible for a technical assistance grant, an applicant must meet the following threshold requirements: (a) The application included...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 47 Telecommunication 2 2014-10-01 2014-10-01 false Technical requirements for space stations in the Satellite Digital Audio Radio Service and associated terrestrial repeaters. 25.214 Section 25.214... Technical Standards § 25.214 Technical requirements for space stations in the Satellite Digital Audio Radio...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 47 Telecommunication 2 2012-10-01 2012-10-01 false Technical requirements for space stations in the satellite digital audio radio service and associated terrestrial repeaters. 25.214 Section 25.214... Technical Standards § 25.214 Technical requirements for space stations in the satellite digital audio radio...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 2 2011-10-01 2011-10-01 false Technical requirements for space stations in the satellite digital audio radio service and associated terrestrial repeaters. 25.214 Section 25.214... Technical Standards § 25.214 Technical requirements for space stations in the satellite digital audio radio...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 47 Telecommunication 2 2013-10-01 2013-10-01 false Technical requirements for space stations in the Satellite Digital Audio Radio Service and associated terrestrial repeaters. 25.214 Section 25.214... Technical Standards § 25.214 Technical requirements for space stations in the Satellite Digital Audio Radio...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 2 2010-10-01 2010-10-01 false Technical requirements for space stations in the satellite digital audio radio service and associated terrestrial repeaters. 25.214 Section 25.214... Technical Standards § 25.214 Technical requirements for space stations in the satellite digital audio radio...
NASA Technical Reports Server (NTRS)
Barta, Daniel J.
2004-01-01
This presentation is planned to be a 10-15 minute "catalytic" focused presentation to be scheduled during one of the working sessions at the TIM. This presentation will focus on Advanced Life Support technologies key to future human Space Exploration as outlined in the Vision, and will include basic requirements, assessment of the state-of-the-art and gaps, and include specific technology metrics. The presentation will be technical in character, lean heavily on data in published ALS documents (such as the Baseline Values and Assumptions Document) but not provide specific technical details or build to information on any technology mentioned (thus the presentation will be benign from an export control and a new technology perspective). The topics presented will be focused on the following elements of Advanced Life Support: air revitalization, water recovery, waste management, thermal control, habitation systems, food systems and bioregenerative life support.
NASA Technical Reports Server (NTRS)
Moore, Thomas C., Sr.
1997-01-01
The NASA Langley Research Center uses more than 10000 strain gages per year in supporting its various research programs. The character of the testing at LaRC is such that the types of strain gage installations, the materials they are applied to, and the test environments encountered, require many varied approaches for installing strain gages. These installations must be accomplished in the most technically discerning and appropriate manner. This technical memorandum is offered as an assisting guide in helping the strain gage user to determine the appropriate approach for a given strain gage application requirement. Specifically, this document offers detailed recommendations for strain gaging the following: LaRC-Designed balances, LARC custom transducers, certain composite materials and alloys, high-temperature test articles, and selected non-typical or unique materials or test conditions.
48 CFR 2052.211-70 - Preparation of technical reports.
Code of Federal Regulations, 2014 CFR
2014-10-01
....211-70 Preparation of technical reports. As prescribed at 2011.104-70(a), the contracting officer... Reports (JAN 1993) All technical reports required by Section C and all Technical Progress Reports required... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Preparation of technical...
48 CFR 2052.211-70 - Preparation of technical reports.
Code of Federal Regulations, 2012 CFR
2012-10-01
....211-70 Preparation of technical reports. As prescribed at 2011.104-70(a), the contracting officer... Reports (JAN 1993) All technical reports required by Section C and all Technical Progress Reports required... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Preparation of technical...
48 CFR 2052.211-70 - Preparation of technical reports.
Code of Federal Regulations, 2010 CFR
2010-10-01
....211-70 Preparation of technical reports. As prescribed at 2011.104-70(a), the contracting officer... Reports (JAN 1993) All technical reports required by Section C and all Technical Progress Reports required... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Preparation of technical...
48 CFR 2052.211-70 - Preparation of technical reports.
Code of Federal Regulations, 2013 CFR
2013-10-01
....211-70 Preparation of technical reports. As prescribed at 2011.104-70(a), the contracting officer... Reports (JAN 1993) All technical reports required by Section C and all Technical Progress Reports required... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Preparation of technical...
48 CFR 2052.211-70 - Preparation of technical reports.
Code of Federal Regulations, 2011 CFR
2011-10-01
....211-70 Preparation of technical reports. As prescribed at 2011.104-70(a), the contracting officer... Reports (JAN 1993) All technical reports required by Section C and all Technical Progress Reports required... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Preparation of technical...
Haeufle, D F B; Günther, M; Wunner, G; Schmitt, S
2014-01-01
In biomechanics and biorobotics, muscles are often associated with reduced movement control effort and simplified control compared to technical actuators. This is based on evidence that the nonlinear muscle properties positively influence movement control. It is, however, open how to quantify the simplicity aspect of control effort and compare it between systems. Physical measures, such as energy consumption, stability, or jerk, have already been applied to compare biological and technical systems. Here a physical measure of control effort based on information entropy is presented. The idea is that control is simpler if a specific movement is generated with less processed sensor information, depending on the control scheme and the physical properties of the systems being compared. By calculating the Shannon information entropy of all sensor signals required for control, an information cost function can be formulated allowing the comparison of models of biological and technical control systems. Exemplarily applied to (bio-)mechanical models of hopping, the method reveals that the required information for generating hopping with a muscle driven by a simple reflex control scheme is only I=32 bits versus I=660 bits with a DC motor and a proportional differential controller. This approach to quantifying control effort captures the simplicity of a control scheme and can be used to compare completely different actuators and control approaches.
2011-12-01
systems engineering technical and technical management processes. Technical Planning, Stakeholders Requirements Development, and Architecture Design were...Stakeholder Requirements Definition, Architecture Design and Technical Planning. A purposive sampling of AFRL rapid development program managers and engineers...emphasize one process over another however Architecture Design , Implementation scored higher among Technical Processes. Decision Analysis, Technical
47 CFR 80.273 - Technical requirements for radar equipment.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 5 2011-10-01 2011-10-01 false Technical requirements for radar equipment. 80... Technical requirements for radar equipment. (a) Radar installations on board ships that are required by the Safety Convention or the U.S. Coast Guard to be equipped with radar must comply with the documents...
47 CFR 80.273 - Technical requirements for radar equipment.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 5 2010-10-01 2010-10-01 false Technical requirements for radar equipment. 80... Technical requirements for radar equipment. (a) Radar installations on board ships that are required by the Safety Convention or the U.S. Coast Guard to be equipped with radar must comply with the documents...
Leventhal, Jeremy C; Cummins, Jonathan A; Schwartz, Peter H; Martin, Douglas K; Tierney, William M
2015-01-01
Electronic health records (EHRs) are proliferating, and financial incentives encourage their use. Applying Fair Information Practice principles to EHRs necessitates balancing patients' rights to control their personal information with providers' data needs to deliver safe, high-quality care. We describe the technical and organizational challenges faced in capturing patients' preferences for patient-controlled EHR access and applying those preferences to an existing EHR. We established an online system for capturing patients' preferences for who could view their EHRs (listing all participating clinic providers individually and categorically-physicians, nurses, other staff) and what data to redact (none, all, or by specific categories of sensitive data or patient age). We then modified existing data-viewing software serving a state-wide health information exchange and a large urban health system and its primary care clinics to allow patients' preferences to guide data displays to providers. Patients could allow or restrict data displays to all clinicians and staff in a demonstration primary care clinic, categories of providers (physicians, nurses, others), or individual providers. They could also restrict access to all EHR data or any or all of five categories of sensitive data (mental and reproductive health, sexually transmitted diseases, HIV/AIDS, and substance abuse) and for specific patient ages. The EHR viewer displayed data via reports, data flowsheets, and coded and free text data displayed by Google-like searches. Unless patients recorded restrictions, by default all requested data were displayed to all providers. Data patients wanted restricted were not displayed, with no indication they were redacted. Technical barriers prevented redacting restricted information in free textnotes. The program allowed providers to hit a "Break the Glass" button to override patients' restrictions, recording the date, time, and next screen viewed. Establishing patient-control over EHR data displays was complex and required ethical, clinical, database, and programming expertise and difficult choices to overcome technical and health system constraints. Assessing patients' preferences for access to their EHRs and applying them in clinical practice requires wide-ranging technical, clinical, and bioethical expertise, to make tough choices to overcome significant technical and organization challenges.
Phase 111A Crew Interface Specifications Development for Inflight Maintenance and Stowage Functions
NASA Technical Reports Server (NTRS)
Carl, John G.
1973-01-01
This report presents the findings and data products developed during the Phase IIIA Crew Interface Specification Study for Inflight Maintenance and Stowage Functions, performed by General Electric for the NASA, Johnson Space Center with a set of documentation that can be used as definitive guidelines to improve the present process of defining, controlling and managing flight crew interface requirements that are related to inflight maintenance (including assembly and servicing) and stowage functions. During the Phase IIIA contract period, the following data products were developed: 1) Projected NASA Crew Procedures/Flight Data File Development Process. 2) Inflight Maintenance Management Process Description. 3) Preliminary Draft, General Specification, Inflight Maintenance Management Requirements. 4) Inflight Maintenance Operational Process Description. 5) Preliminary Draft, General Specification, Inflight Maintenance Task and Support Requirements Analysis. 6) Suggested IFM Data Processing Reports for Logistics Management The above Inflight Maintenance data products have been developed during the Phase IIIA study after review of Space Shuttle Program Documentation, including the Level II Integrated Logistics Requirements and other DOD and NASA data relative to Payloads Accommodations and Satellite On-Orbit Servicing. These Inflight Maintenance data products were developed to be in consonance with Space Shuttle Program technical and management requirements.
Technical Aspects of Acoustical Engineering for the ISS [International Space Station
NASA Technical Reports Server (NTRS)
Allen, Christopher S.
2009-01-01
It is important to control acoustic levels on manned space flight vehicles and habitats to protect crew-hearing, allow for voice communications, and to ensure a healthy and habitable environment in which to work and live. For the International Space Station (ISS) this is critical because of the long duration crew-stays of approximately 6-months. NASA and the JSC Acoustics Office set acoustic requirements that must be met for hardware to be certified for flight. Modules must meet the NC-50 requirement and other component hardware are given smaller allocations to meet. In order to meet these requirements many aspects of noise generation and control must be considered. This presentation has been developed to give an insight into the various technical activities performed at JSC to ensure that a suitable acoustic environment is provided for the ISS crew. Examples discussed include fan noise, acoustic flight material development, on-orbit acoustic monitoring, and a specific hardware development and acoustical design case, the ISS Crew Quarters.
Thermal Storage Applications Workshop. Volume 2: Contributed Papers
NASA Technical Reports Server (NTRS)
1979-01-01
The solar thermal and the thermal and thermochemical energy storage programs are described as well as the technology requirements for both external (electrical) and internal (thermal, chemical) modes for energy storage in solar power plants. Specific technical issues addressed include thermal storage criteria for solar power plants interfacing with utility systems; optimal dispatch of storage for solar plants in a conventional electric grid; thermal storage/temperature tradeoffs for solar total energy systems; the value of energy storage for direct-replacement solar thermal power plants; systems analysis of storage in specific solar thermal power applications; the value of seasonal storage of solar energy; criteria for selection of the thermal storage system for a 10 MW(2) solar power plant; and the need for specific requirements by storage system development teams.
Technical and tactical skills related to performance levels in tennis: A systematic review.
Kolman, Nikki S; Kramer, Tamara; Elferink-Gemser, Marije T; Huijgen, Barbara C H; Visscher, Chris
2018-06-11
The aim of this systematic review is to provide an overview of outcome measures and instruments identified in the literature for examining technical and tactical skills in tennis related to performance levels. Such instruments can be used to identify talent or the specific skill development training needs of particular players. Searches for this review were conducted using the PubMed, Web of Science, and PsycInfo databases. Out of 733 publications identified through these searches, 40 articles were considered relevant and included in this study. They were divided into three categories: (1) technical skills, (2) tactical skills and (3) integrated technical and tactical skills. There was strong evidence that technical skills (ball velocity and to a lesser extent ball accuracy) and tactical skills (decision making, anticipation, tactical knowledge and visual search strategies) differed among players according to their performance levels. However, integrated measurement of these skills is required, because winning a point largely hinges on a tactical decision to perform a particular stroke (i.e., technical execution). Therefore, future research should focus on examining the relationship between these skills and tennis performance and on the development of integrated methods for measuring these skills.
Czaplik, M; Bergrath, S; Rossaint, R; Thelen, S; Brodziak, T; Valentin, B; Hirsch, F; Beckers, S K; Brokmann, J C
2014-01-01
Demographic change, rising co-morbidity and an increasing number of emergencies are the main challenges that emergency medical services (EMS) in several countries worldwide are facing. In order to improve quality in EMS, highly trained personnel and well-equipped ambulances are essential. However several studies have shown a deficiency in qualified EMS physicians. Telemedicine emerges as a complementary system in EMS that may provide expertise and improve quality of medical treatment on the scene. Hence our aim is to develop and test a specific teleconsultation system. During the development process several use cases were defined and technically specified by medical experts and engineers in the areas of: system administration, start-up of EMS assistance systems, audio communication, data transfer, routine tele-EMS physician activities and research capabilities. Upon completion, technical field tests were performed under realistic conditions to test system properties such as robustness, feasibility and usability, providing end-to-end measurements. Six ambulances were equipped with telemedical facilities based on the results of the requirement analysis and 55 scenarios were tested under realistic conditions in one month. The results indicate that the developed system performed well in terms of usability and robustness. The major challenges were, as expected, mobile communication and data network availability. Third generation networks were only available in 76.4% of the cases. Although 3G (third generation), such as Universal Mobile Telecommunications System (UMTS), provides beneficial conditions for higher bandwidth, system performance for most features was also acceptable under adequate 2G (second generation) test conditions. An innovative concept for the use of telemedicine for medical consultations in EMS was developed. Organisational and technical aspects were considered and practical requirements specified. Since technical feasibility was demonstrated in these technical field tests, the next step would be to prove medical usefulness and technical robustness under real conditions in a clinical trial.
South Carolina Guide for Mathematics for the Technologies (Applied Vocational Mathematics).
ERIC Educational Resources Information Center
Moore, Charles; And Others
In this instructional guide, a third-level, two-semester mathematics course specifically for the student who plans a career in a vocational field is presented. The course is designed to meet the needs of students with varying mathematical backgrounds and to teach the mathematical skills required by various technical areas. In this practical…
TOPEX Software Document Series. Volume 5; Rev. 1; TOPEX GDR Processing
NASA Technical Reports Server (NTRS)
Lee, Jeffrey; Lockwood, Dennis; Hancock, David W., III
2003-01-01
This document is a compendium of the WFF TOPEX Software Development Team's knowledge regarding Geophysical Data Record (GDR) Processing. It includes many elements of a requirements document, a software specification document, a software design document, and a user's manual. In the more technical sections, this document assumes the reader is familiar with TOPEX and instrument files.
Connecting the Dots and Nodes: A Survey of Skills Requested by Employers for Network Administrators
ERIC Educational Resources Information Center
Morris, Gerard; Fustos, Janos; Haga, Wayne
2018-01-01
One definition of a network administrator describes a person who works with computer infrastructures with an emphasis on networking. To determine the specific skills required of a network administrator by employers, data was collected from 698 nationwide job advertisements on Dice.com. The data collection focused on technical skills rather than…
2015-04-10
Peripheral Interface SpO2 Arterial Oxygen Saturation Measured via Pulse - Oximeter SRS Software Requirements Specification SV Stroke Volume SVR Systemic...viewer ....................................................................................................... 9 Figure 3: Pulse OX custom module...analysis approaches will be gathered. Sensors which detect SpO2, pulse / pulse rate, ECG, and skin temperature will be researched and evaluated for
ERIC Educational Resources Information Center
Chung, Gregory K. W. K.
This study examined a civil engineering capstone course that embedded a sophisticated simulation-based task within instruction. Students (n=28) were required to conduct a hazardous waste site investigation using simulation software designed specifically for the course (Interactive Site Investigation Software) (ISIS). The software simulated…
The World in Slow Motion: Using a High-Speed Camera in a Physics Workshop
ERIC Educational Resources Information Center
Dewanto, Andreas; Lim, Geok Quee; Kuang, Jianhong; Zhang, Jinfeng; Yeo, Ye
2012-01-01
We present a physics workshop for college students to investigate various physical phenomena using high-speed cameras. The technical specifications required, the step-by-step instructions, as well as the practical limitations of the workshop, are discussed. This workshop is also intended to be a novel way to promote physics to Generation-Y…
1976-06-01
the imformation needed to perform the design funct ions, but will also provide the user with the details required to interact with other individuals...several calls of basic drafting (DRA) macros. The deck heights are constant andincluded in the coding. Al - identifies the specific frame to be retrived
Performance evaluation approach for the supercritical helium cold circulators of ITER
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vaghela, H.; Sarkar, B.; Bhattacharya, R.
2014-01-29
The ITER project design foresees Supercritical Helium (SHe) forced flow cooling for the main cryogenic components, namely, the superconducting (SC) magnets and cryopumps (CP). Therefore, cold circulators have been selected to provide the required SHe mass flow rate to cope with specific operating conditions and technical requirements. Considering the availability impacts of such machines, it has been decided to perform evaluation tests of the cold circulators at operating conditions prior to the series production in order to minimize the project technical risks. A proposal has been conceptualized, evaluated and simulated to perform representative tests of the full scale SHe coldmore » circulators. The objectives of the performance tests include the validation of normal operating condition, transient and off-design operating modes as well as the efficiency measurement. A suitable process and instrumentation diagram of the test valve box (TVB) has been developed to implement the tests at the required thermodynamic conditions. The conceptual engineering design of the TVB has been developed along with the required thermal analysis for the normal operating conditions to support the performance evaluation of the SHe cold circulator.« less
NASA Technical Reports Server (NTRS)
1974-01-01
The work is reported, which was performed in the specific tasks of the Planetary Quarantine research program for developing parameter specifications of unmanned scientific missions to the planets. The effort was directed principally toward the advancement of the quarantine technology, applicable to all future missions to planets of biological interest. The emphasis of the research was on coordinated evaluation, analysis, documentation, and presentation of PQ requirements for flight projects such as Viking and Pioneer.
NASA Technical Reports Server (NTRS)
Sercel, Joel C.
1991-01-01
The topics presented are covered in viewgraph form. The programmatic objective is to establish the feasibility of propulsion technologies for vastly expanded space activity. The technical objective is a revolutionary performance sought, such as: (1) about 1 kg/kW specific mass; (2) specific impulse tailored to mission requirements; (3) ability to use in-situ resources; (4) round-trips to Mars in months; (5) round-trips to outer planets in 1 to 2 years; and (6) the capability for robotic mission beyond the solar system.
1999-11-18
telecommunications and data processing installations, Berlin Offenbach: vde - verlag 4. DIN EN 187000: Specification of optical fiber cables...Berlin Offenbach : vde - verlag 5. DIN EN 188000: Specification of optical fibers, Berlin Offenbach : vde - verlag 6. IEC 60793-1: Optical fibers, Part 1...subsystem of customer premises up to a frequency of 100 MHz. The technical requirements of these balanced cabling systems are defined in the standards EN
16 CFR 1401.5 - Providing performance and technical data to purchasers by labeling.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 16 Commercial Practices 2 2014-01-01 2014-01-01 false Providing performance and technical data to...: REQUIREMENTS TO PROVIDE THE COMMISSION WITH PERFORMANCE AND TECHNICAL DATA; REQUIREMENTS TO NOTIFY CONSUMERS AT POINT OF PURCHASE OF PERFORMANCE AND TECHNICAL DATA § 1401.5 Providing performance and technical data to...
16 CFR 1401.5 - Providing performance and technical data to purchasers by labeling.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 16 Commercial Practices 2 2012-01-01 2012-01-01 false Providing performance and technical data to...: REQUIREMENTS TO PROVIDE THE COMMISSION WITH PERFORMANCE AND TECHNICAL DATA; REQUIREMENTS TO NOTIFY CONSUMERS AT POINT OF PURCHASE OF PERFORMANCE AND TECHNICAL DATA § 1401.5 Providing performance and technical data to...
16 CFR 1401.5 - Providing performance and technical data to purchasers by labeling.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 16 Commercial Practices 2 2011-01-01 2011-01-01 false Providing performance and technical data to...: REQUIREMENTS TO PROVIDE THE COMMISSION WITH PERFORMANCE AND TECHNICAL DATA; REQUIREMENTS TO NOTIFY CONSUMERS AT POINT OF PURCHASE OF PERFORMANCE AND TECHNICAL DATA § 1401.5 Providing performance and technical data to...
16 CFR 1401.5 - Providing performance and technical data to purchasers by labeling.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Providing performance and technical data to...: REQUIREMENTS TO PROVIDE THE COMMISSION WITH PERFORMANCE AND TECHNICAL DATA; REQUIREMENTS TO NOTIFY CONSUMERS AT POINT OF PURCHASE OF PERFORMANCE AND TECHNICAL DATA § 1401.5 Providing performance and technical data to...
Weedle, Rebecca; Morris, Marie; Ridgway, Paul
2016-01-01
Objectives To identify current entry requirements set by international medical licensing bodies for immigrating physicians, focusing on postgraduate level communication skills, clinical and technical skill assessments. Methods A standardised, author developed survey was administered to a selection of national, state and provincial licensing institutions across 6 continents. Representative institutions were selected from the most populated regions of each continent. Surveys were administered by email and telephone. The information was also searched by website review. Website information alone was used if no response was received by the targeted institution after 2 phone/2 email attempts. Statistical analysis of the non-parametric data was conducted using SPSS (v.21). Results Thirty-seven licensing bodies were contacted from 30 countries; verifiable information was available for 29; twenty-six responded to the communication inquiry. Sixty five 65.4% (n=17) surveyed communication skills, 100% involved language proficiency testing; 11.5% tested other forms of communication skills. For clinical and technical skills, 86.2% (n=25) assessed candidates by credential review, 72.4% (n=21) required both credential review and exam and 62.1% (n=18) used country-specific examination. A mentorship period were required by 37.9% (n=11), ranging from 3 months to 1 year. Only 2 countries identified examinations for recertification. No technical/clinical skills nor communication skill evaluation (beyond language proficiency) are routinely assessed at the postgraduate level. Conclusions International assessments of migrating physicians are heterogeneous. Communication skills, beyond language proficiency, are not routinely assessed in foreign trained physicians seeking entry. The majority of clinical and technical skills are assessed by credential review only. This study highlights the lack of standardisation of assessment internationally and the need for steps toward a global agreement on training schemes and summative assessment. PMID:26851517
Gillis, Amy; Weedle, Rebecca; Morris, Marie; Ridgway, Paul
2016-02-06
To identify current entry requirements set by international medical licensing bodies for immigrating physicians, focusing on postgraduate level communication skills, clinical and technical skill assessments. A standardised, author developed survey was administered to a selection of national, state and provincial licensing institutions across 6 continents. Representative institutions were selected from the most populated regions of each continent. Surveys were administered by email and telephone. The information was also searched by website review. Website information alone was used if no response was received by the targeted institution after 2 phone/2 email attempts. Statistical analysis of the non-parametric data was conducted using SPSS (v.21). Thirty-seven licensing bodies were contacted from 30 countries; verifiable information was available for 29; twenty-six responded to the communication inquiry. Sixty five 65.4% (n=17) surveyed communication skills, 100% involved language proficiency testing; 11.5% tested other forms of communication skills. For clinical and technical skills, 86.2% (n=25) assessed candidates by credential review, 72.4% (n=21) required both credential review and exam and 62.1% (n=18) used country-specific examination. A mentorship period were required by 37.9% (n=11), ranging from 3 months to 1 year. Only 2 countries identified examinations for recertification. No technical/clinical skills nor communication skill evaluation (beyond language proficiency) are routinely assessed at the postgraduate level. International assessments of migrating physicians are heterogeneous. Communication skills, beyond language proficiency, are not routinely assessed in foreign trained physicians seeking entry. The majority of clinical and technical skills are assessed by credential review only. This study highlights the lack of standardisation of assessment internationally and the need for steps toward a global agreement on training schemes and summative assessment.
NASA Risk Management Handbook. Version 1.0
NASA Technical Reports Server (NTRS)
Dezfuli, Homayoon; Benjamin, Allan; Everett, Christopher; Maggio, Gaspare; Stamatelatos, Michael; Youngblood, Robert; Guarro, Sergio; Rutledge, Peter; Sherrard, James; Smith, Curtis;
2011-01-01
The purpose of this handbook is to provide guidance for implementing the Risk Management (RM) requirements of NASA Procedural Requirements (NPR) document NPR 8000.4A, Agency Risk Management Procedural Requirements [1], with a specific focus on programs and projects, and applying to each level of the NASA organizational hierarchy as requirements flow down. This handbook supports RM application within the NASA systems engineering process, and is a complement to the guidance contained in NASA/SP-2007-6105, NASA Systems Engineering Handbook [2]. Specifically, this handbook provides guidance that is applicable to the common technical processes of Technical Risk Management and Decision Analysis established by NPR 7123.1A, NASA Systems Engineering Process and Requirements [3]. These processes are part of the \\Systems Engineering Engine. (Figure 1) that is used to drive the development of the system and associated work products to satisfy stakeholder expectations in all mission execution domains, including safety, technical, cost, and schedule. Like NPR 7123.1A, NPR 8000.4A is a discipline-oriented NPR that intersects with product-oriented NPRs such as NPR 7120.5D, NASA Space Flight Program and Project Management Requirements [4]; NPR 7120.7, NASA Information Technology and Institutional Infrastructure Program and Project Management Requirements [5]; and NPR 7120.8, NASA Research and Technology Program and Project Management Requirements [6]. In much the same way that the NASA Systems Engineering Handbook is intended to provide guidance on the implementation of NPR 7123.1A, this handbook is intended to provide guidance on the implementation of NPR 8000.4A. 1.2 Scope and Depth This handbook provides guidance for conducting RM in the context of NASA program and project life cycles, which produce derived requirements in accordance with existing systems engineering practices that flow down through the NASA organizational hierarchy. The guidance in this handbook is not meant to be prescriptive. Instead, it is meant to be general enough, and contain a sufficient diversity of examples, to enable the reader to adapt the methods as needed to the particular risk management issues that he or she faces. The handbook highlights major issues to consider when managing programs and projects in the presence of potentially significant uncertainty, so that the user is better able to recognize and avoid pitfalls that might otherwise be experienced.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-02
... Software Developers on the Technical Specifications for Common Formats for Patient Safety Data Collection... software developers can provide input on these technical specifications for the Common Formats Version 1.1... specifications, which provide direction to software developers that plan to implement the Common Formats...
47 CFR 15.15 - General technical requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 1 2010-10-01 2010-10-01 false General technical requirements. 15.15 Section 15.15 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL RADIO FREQUENCY DEVICES General § 15.15 General technical requirements. (a) An intentional or unintentional radiator shall be...
47 CFR 80.659 - Technical requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 5 2010-10-01 2010-10-01 false Technical requirements. 80.659 Section 80.659 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES STATIONS IN THE MARITIME SERVICES Maritime Support Stations § 80.659 Technical requirements. The authorized frequency...
9 CFR 351.17 - Identification required.
Code of Federal Regulations, 2012 CFR
2012-01-01
... INSPECTION AND CERTIFICATION CERTIFICATION OF TECHNICAL ANIMAL FATS FOR EXPORT Transportation and Exportation of Certified Technical Animal Fat § 351.17 Identification required. Certified technical animal fats... certified plants shall be accompanied by MP Form 85 (Declaration to Accompany Technical Animal Fats Between...
9 CFR 351.17 - Identification required.
Code of Federal Regulations, 2010 CFR
2010-01-01
... INSPECTION AND CERTIFICATION CERTIFICATION OF TECHNICAL ANIMAL FATS FOR EXPORT Transportation and Exportation of Certified Technical Animal Fat § 351.17 Identification required. Certified technical animal fats... certified plants shall be accompanied by MP Form 85 (Declaration to Accompany Technical Animal Fats Between...
9 CFR 351.17 - Identification required.
Code of Federal Regulations, 2013 CFR
2013-01-01
... INSPECTION AND CERTIFICATION CERTIFICATION OF TECHNICAL ANIMAL FATS FOR EXPORT Transportation and Exportation of Certified Technical Animal Fat § 351.17 Identification required. Certified technical animal fats... certified plants shall be accompanied by MP Form 85 (Declaration to Accompany Technical Animal Fats Between...
9 CFR 351.17 - Identification required.
Code of Federal Regulations, 2011 CFR
2011-01-01
... INSPECTION AND CERTIFICATION CERTIFICATION OF TECHNICAL ANIMAL FATS FOR EXPORT Transportation and Exportation of Certified Technical Animal Fat § 351.17 Identification required. Certified technical animal fats... certified plants shall be accompanied by MP Form 85 (Declaration to Accompany Technical Animal Fats Between...
9 CFR 351.17 - Identification required.
Code of Federal Regulations, 2014 CFR
2014-01-01
... INSPECTION AND CERTIFICATION CERTIFICATION OF TECHNICAL ANIMAL FATS FOR EXPORT Transportation and Exportation of Certified Technical Animal Fat § 351.17 Identification required. Certified technical animal fats... certified plants shall be accompanied by MP Form 85 (Declaration to Accompany Technical Animal Fats Between...
Savel, Craig; Mierzwa, Stan; Gorbach, Pamina M.; Souidi, Samir; Lally, Michelle; Zimet, Gregory; Interventions, AIDS
2016-01-01
This paper reports on a specific Web-based self-report data collection system that was developed for a public health research study in the United States. Our focus is on technical outcome results and lessons learned that may be useful to other projects requiring such a solution. The system was accessible from any device that had a browser that supported HTML5. Report findings include: which hardware devices, Web browsers, and operating systems were used; the rate of survey completion; and key considerations for employing Web-based surveys in a clinical trial setting. PMID:28149445
NASA Technical Reports Server (NTRS)
ONeil, D. A.; Mankins, J. C.; Christensen, C. B.; Gresham, E. C.
2005-01-01
The Advanced Technology Lifecycle Analysis System (ATLAS), a spreadsheet analysis tool suite, applies parametric equations for sizing and lifecycle cost estimation. Performance, operation, and programmatic data used by the equations come from a Technology Tool Box (TTB) database. In this second TTB Technical Interchange Meeting (TIM), technologists, system model developers, and architecture analysts discussed methods for modeling technology decisions in spreadsheet models, identified specific technology parameters, and defined detailed development requirements. This Conference Publication captures the consensus of the discussions and provides narrative explanations of the tool suite, the database, and applications of ATLAS within NASA s changing environment.
A review of the salt-gradient solar pond technology
NASA Technical Reports Server (NTRS)
Lin, E. I. H.
1982-01-01
The state of the salt-gradient solar pond technology is reviewed. Highlights of findings and experiences from existing ponds to data are presented, and the behavior, energy yield, operational features, and economics of solar ponds are examined. It is concluded that salt-gradient solar ponds represent a technically feasible, environmentally benign, and economically attractive energy producing alternative. In order to bring this emerging technology to maturity, however, much research and development effort remains to be undertaken. Specific R&D areas requiring the attention and action of technical workers and decision-makers are discussed, both from the perspectives of smaller, thermally-oriented ponds and larger, electricity generating ponds.
13 CFR 306.2 - Award requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... TRAINING, RESEARCH AND TECHNICAL ASSISTANCE INVESTMENTS Local and National Technical Assistance § 306.2 Award requirements. EDA selects Projects for Local and National Technical Assistance Investments in...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-25
... Information Collection: Technical Processing Requirements for Multifamily Project Mortgage Insurance AGENCY: Office of the Chief Information Officer, HUD. ACTION: Notice. SUMMARY: HUD has submitted the proposed... Information Collection Title of Information Collection: Technical Processing Requirements for Multifamily...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Farnham, Irene; Rehfeldt, Kenneth
Preemptive reviews (PERs) of Underground Test Area (UGTA) Activity corrective action unit (CAU) studies are an important and long-maintained quality improvement process. The CAU-specific PER committees provide internal technical review of ongoing work throughout the CAU lifecycle. The reviews, identified in the UGTA Quality Assurance Plan (QAP) (Sections 1.3.5.1 and 3.2), assure work is comprehensive, accurate, in keeping with the state of the art, and consistent with CAU goals. PER committees review various products, including data, documents, software/codes, analyses, and models. PER committees may also review technical briefings including Federal Facility Agreement and Consent Order (FFACO)-required presentations to the Nevadamore » Division of Environmental Protection (NDEP) and presentations supporting key technical decisions (e.g., investigation plans and approaches). PER committees provide technical recommendations to support regulatory decisions that are the responsibility of the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) and NDEP.« less
16 CFR § 1401.5 - Providing performance and technical data to purchasers by labeling.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 16 Commercial Practices 2 2013-01-01 2013-01-01 false Providing performance and technical data to...: REQUIREMENTS TO PROVIDE THE COMMISSION WITH PERFORMANCE AND TECHNICAL DATA; REQUIREMENTS TO NOTIFY CONSUMERS AT POINT OF PURCHASE OF PERFORMANCE AND TECHNICAL DATA § 1401.5 Providing performance and technical data to...
Integrated controls and health monitoring for chemical transfer propulsion
NASA Technical Reports Server (NTRS)
Millis, Marc G.; Binder, Michael P.
1990-01-01
NASA is reviewing various propulsion technologies for exploring space. The requirements are examined for one enabling propulsion technology: Integrated Controls and Health Monitoring (ICHM) for Chemical Transfer Propulsion (CTP). Functional requirements for a CTP-ICHM system are proposed from tentative mission scenarios, vehicle configurations, CTP specifications, and technical feasibility. These CTP-ICHM requirements go beyond traditional reliable operation and emergency shutoff control to include: (1) enhanced mission flexibility; (2) continuously variable throttling; (3) tank-head start control; (4) automated prestart and post-shutoff engine check; (5) monitoring of space exposure degradation; and (6) product evolution flexibility. Technology development plans are also discussed.
Thin Film Coating Technology For Ophthalmic Lenses
NASA Astrophysics Data System (ADS)
Guenther, K. H.
1986-05-01
Coating of ophthalmic lenses is an application of high-vacuum coating technology which must satisfy not only physical and technical requirements but also customer demands with respect to aesthetics, color fidelity, and exchangeability of coated ophthalmic lenses. Because this application caters specifically to the consumer market, ophthalmic lenses are subject to certain fashion trends which frequently require quick adaptation of the coating technique. The state-of-the-art of ophthalmic lens coating is reviewed in this paper, with particular emphasis on the durability requirements in daily use by untrained consumers as well as on the applicable testing methods.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-01
... Information Collection: Technical Processing Requirements for Multifamily Project Mortgage Insurance AGENCY: Office of the Chief Information Officer, HUD. ACTION: Correction, notice. SUMMARY: On October 25, 2013 at... Collection Title of Information Collection: Technical Processing Requirements for Multifamily Project...
47 CFR 15.517 - Technical requirements for indoor UWB systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 1 2010-10-01 2010-10-01 false Technical requirements for indoor UWB systems. 15.517 Section 15.517 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL RADIO FREQUENCY DEVICES Ultra-Wideband Operation § 15.517 Technical requirements for indoor UWB systems. (a) Operation...
47 CFR 15.511 - Technical requirements for surveillance systems.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 47 Telecommunication 1 2013-10-01 2013-10-01 false Technical requirements for surveillance systems... DEVICES Ultra-Wideband Operation § 15.511 Technical requirements for surveillance systems. (a) The UWB... surveillance systems operated by law enforcement, fire or emergency rescue organizations or by manufacturers...
47 CFR 15.511 - Technical requirements for surveillance systems.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 47 Telecommunication 1 2012-10-01 2012-10-01 false Technical requirements for surveillance systems... DEVICES Ultra-Wideband Operation § 15.511 Technical requirements for surveillance systems. (a) The UWB... surveillance systems operated by law enforcement, fire or emergency rescue organizations or by manufacturers...
47 CFR 15.511 - Technical requirements for surveillance systems.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 1 2011-10-01 2011-10-01 false Technical requirements for surveillance systems... DEVICES Ultra-Wideband Operation § 15.511 Technical requirements for surveillance systems. (a) The UWB... surveillance systems operated by law enforcement, fire or emergency rescue organizations or by manufacturers...
47 CFR 15.511 - Technical requirements for surveillance systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 1 2010-10-01 2010-10-01 false Technical requirements for surveillance systems... DEVICES Ultra-Wideband Operation § 15.511 Technical requirements for surveillance systems. (a) The UWB... surveillance systems operated by law enforcement, fire or emergency rescue organizations or by manufacturers...
47 CFR 15.511 - Technical requirements for surveillance systems.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 47 Telecommunication 1 2014-10-01 2014-10-01 false Technical requirements for surveillance systems... DEVICES Ultra-Wideband Operation § 15.511 Technical requirements for surveillance systems. (a) The UWB... surveillance systems operated by law enforcement, fire or emergency rescue organizations or by manufacturers...
30 CFR 7.404 - Technical requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Technical requirements. 7.404 Section 7.404 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR TESTING, EVALUATION, AND... Cable Splice Kits § 7.404 Technical requirements. (a) Electric cables and splices shall be flame...
Review of PREPA Technical Requirements for Interconnecting Wind and Solar Generation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gevorgian, Vahan; Booth, Sarah
2013-11-01
The Puerto Rico Electric Power Authority developed the minimum technical requirements for interconnection of wind turbine generation and photovoltaic power plants. NREL has conducted a review of these requirements based on generic technical aspects and electrical characteristics of wind and photovoltaic power plants, and on existing requirements from other utilities (both U.S. and European).
SafeConnect Solar - Final Scientific/Technical Report (Updated)
DOE Office of Scientific and Technical Information (OSTI.GOV)
McNish, Zachary
2016-02-03
Final Scientific/Technical Report from Tier 0 SunShot Incubator award for hardware-based solution to reducing soft costs of installed solar. The primary objective of this project was for SafeConnect Solar (“SafeConnect”) to create working proof-of-concept hardware prototypes from its proprietary intellectual property and business concepts for a plug-and-play, safety-oriented hardware solution for photovoltaic solar systems. Specifically, SafeConnect sought to build prototypes of its “SmartBox” and related cabling and connectors, as well as the firmware needed to run the hardware. This hardware is designed to ensure a residential PV system installed with it can address all safety concerns that currently form themore » basis of AHJ electrical permitting and licensing requirements, thereby reducing the amount of permitting and specialized labor required on a residential PV system, and also opening up new sales channels and customer acquisition opportunities.« less
CIM's bridge from CADD to CAM: Data management requirements for manufacturing engineering
NASA Technical Reports Server (NTRS)
Ford, S. J.
1984-01-01
Manufacturing engineering represents the crossroads of technical data management in a Computer Integrated Manufacturing (CIM) environment. Process planning, numerical control programming and tool design are the key functions which translate information from as engineered to as assembled. In order to transition data from engineering to manufacturing, it is necessary to introduce a series of product interpretations which contain an interim introduction of technical parameters. The current automation of the product definition and the production process places manufacturing engineering in the center of CAD/CAM with the responsibility of communicating design data to the factory floor via a manufacturing model of the data. A close look at data management requirements for manufacturing engineering is necessary in order to establish the overall specifications for CADD output, CAM input, and CIM integration. The functions and issues associated with the orderly evolution of computer aided engineering and manufacturing are examined.
47 CFR 15.513 - Technical requirements for medical imaging systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 1 2010-10-01 2010-10-01 false Technical requirements for medical imaging systems. 15.513 Section 15.513 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL RADIO FREQUENCY DEVICES Ultra-Wideband Operation § 15.513 Technical requirements for medical imaging systems. (a) The UWB...
77 FR 29247 - Federal Motor Vehicle Safety Standards; Occupant Crash Protection
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-17
...). ACTION: Final rule; technical amendments. SUMMARY: This final rule makes technical amendments to Federal... advanced air bag requirements. As written now, the general warning label requirements contain an explicit... equipment requirements for restraint systems. This document makes technical amendments to several of the...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-12
... DEPARTMENT OF HEALTH AND HUMAN SERVICES Food and Drug Administration [Docket No. FDA-2010-D-0165] International Cooperation on Harmonisation of Technical Requirements for Registration of Veterinary Medicinal... veterinary use by the International Cooperation on Harmonisation of Technical Requirements for Registration...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-08
... calibration procedures under MIL-T-31000, General Specification for Technical Data Packages, Amendment 1, or MIL-T-47500, General Specification for Technical Data Packages, Supp 1, or drawings and associated... Packages, Amendment 1, or MIL-T-47500, General Specification for Technical Data Packages, Supp 1, or...
Automotive Mechanics as Applied to Auto Body; Auto Body Repair and Refinishing 3: 9037.02.
ERIC Educational Resources Information Center
Dade County Public Schools, Miami, FL.
This is a course in which the student will receive the general information, technical knowledge, basic skills, attitudes, and values required for job entry level as an auto body repair helper. Course content includes general and specific goals, orientation, instruction in service tools and bench skills, and auto mechanics as applied to auto body.…
Two-Black Box Concept for Warhead Verification
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bates, Cameron Russell; Frame, Katherine Chiyoko; Mckigney, Edward Allen
2017-03-06
We have created a possible solution to meeting the requirements of certification/authentication while still employing complicated criteria. Technical solutions to protecting information from the host in an inspection environment needs to be assessed by those with specific expertise but, LANL can still study the verification problem. The two-black box framework developed provides another potential solution to the confidence vs. certification paradox.
Automatic Requirements Specification Extraction from Natural Language (ARSENAL)
2014-10-01
designers, implementers) involved in the design of software systems. However, natural language descriptions can be informal, incomplete, imprecise...communication of technical descriptions between the various stakeholders (e.g., customers, designers, imple- menters) involved in the design of software systems...the accuracy of the natural language processing stage, the degree of automation, and robustness to noise. 1 2 Introduction Software systems operate in
Revision of ISO 15859 Aerospace Fluid Standards
NASA Technical Reports Server (NTRS)
Greene, Benjamin; McClure, Mark B.
2012-01-01
A detailed review of ISO 15859 "Space Systems - Fluid Characteristics, Sampling and Test Methods" was performed An approach to revising Parts 1-9 and 11-13 was developed and concurred by the NASA Technical Standards Program Office. The approach was to align them with the highest level source documents, and not to program-specific requirements. The updated documents were prepared and presented.
The George C. Marshall Space Flight Center High Reynolds Number Wind Tunnel Technical Handbook
NASA Technical Reports Server (NTRS)
Gwin, H. S.
1975-01-01
The High Reynolds Number Wind Tunnel at the George C. Marshall Space Flight Center is described. The following items are presented to illustrate the operation and capabilities of the facility: facility descriptions and specifications, operational and performance characteristics, model design criteria, instrumentation and data recording equipment, data processing and presentation, and preliminary test information required.
ERIC Educational Resources Information Center
Haverland, Edgar M.
The report describes a project designed to facilitate the transfer and utilization of training technology by developing a model for evaluating training approaches or innovtions in relation to the requirements, resources, and constraints of specific training settings. The model consists of two parallel sets of open-ended questions--one set…
WFF TOPEX Software Documentation Altimeter Instrument File (AIF) Processing, October 1998. Volume 3
NASA Technical Reports Server (NTRS)
Lee, Jeffrey; Lockwood, Dennis
2003-01-01
This document is a compendium of the WFF TOPEX Software Development Team's knowledge regarding Sensor Data Record (SDR) Processing. It includes many elements of a requirements document, a software specification document, a software design document, and a user's manual. In the more technical sections, this document assumes the reader is familiar with TOPEX and instrument files.
Applications of aerospace technology in industry, a technology transfer profile: Lubrication
NASA Technical Reports Server (NTRS)
Kottenstette, J. P.; Freeman, J. E.; Heins, C. R.; Hildred, W. M.; Johnson, F. D.; Staskin, E. R.
1971-01-01
Technology transfer in the lubrication field is discussed in terms of the movement of NASA-generated lubrication technology into the private sector as affected by evolving industrial requirements. An overview of the field is presented, and NASA technical contributions to lubrication technology are described. Specific examples in which these technologies have been used in the private sector are summarized.
Pelliccia, Francesco; Palmiero, Pasquale; Maiello, Maria; Losi, Maria-Angela
2012-07-01
Hand-carried ultrasound devices (HCDs), also named personal use echo, are pocket-size, compact, and battery-equipped echocardiographic systems. They have limited technical capabilities but offer some advantages compared with standard echocardiographic devices due to their simplicity of use, immediate availability at the patient's bedside, transportability, and relatively low cost. Current HCDs are considered as screening tools and are used to complement the physical examination by cardiologists. Many noncardiologic subspecialists, however, have adopted this technologic advancement rapidly raising the concern of an inappropriate use of HCD by health professionals who do not have any specific training. In keeping with the mission of the International Society of Cardiovascular Ultrasound to advance the science and art of cardiovascular ultrasound and encourage the knowledge of this subject, the purpose of this Expert Consensus document is to focus on the training for all health care professionals considering the use of HCD. Accordingly, this paper summarizes general aspects of HCD, such as technical characteristics and clinical indications, and then details the specific training requirements for noncardiologists (i.e., training program, minimum case load, duration, and certification of competence). © 2012, Wiley Periodicals, Inc.
40 CFR 58.11 - Network technical requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 5 2010-07-01 2010-07-01 false Network technical requirements. 58.11... (CONTINUED) AMBIENT AIR QUALITY SURVEILLANCE Monitoring Network § 58.11 Network technical requirements. (a)(1... A to this part when operating the SLAMS networks. (2) Beginning January 1, 2009, State and local...
40 CFR 58.11 - Network technical requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 5 2011-07-01 2011-07-01 false Network technical requirements. 58.11... (CONTINUED) AMBIENT AIR QUALITY SURVEILLANCE Monitoring Network § 58.11 Network technical requirements. (a)(1... A to this part when operating the SLAMS networks. (2) Beginning January 1, 2009, State and local...
47 CFR 15.510 - Technical requirements for through D-wall imaging systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 1 2010-10-01 2010-10-01 false Technical requirements for through D-wall imaging systems. 15.510 Section 15.510 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL RADIO FREQUENCY DEVICES Ultra-Wideband Operation § 15.510 Technical requirements for through D-wall imaging...
47 CFR 15.515 - Technical requirements for vehicular radar systems.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 1 2011-10-01 2011-10-01 false Technical requirements for vehicular radar... DEVICES Ultra-Wideband Operation § 15.515 Technical requirements for vehicular radar systems. (a..., changing gears, or engaging a turn signal. (b) The UWB bandwidth of a vehicular radar system operating...
47 CFR 15.515 - Technical requirements for vehicular radar systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 1 2010-10-01 2010-10-01 false Technical requirements for vehicular radar... DEVICES Ultra-Wideband Operation § 15.515 Technical requirements for vehicular radar systems. (a..., changing gears, or engaging a turn signal. (b) The UWB bandwidth of a vehicular radar system operating...
47 CFR 80.231 - Technical Requirements for Class B Automatic Identification System (AIS) equipment.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Identification System (AIS) equipment. 80.231 Section 80.231 Telecommunication FEDERAL COMMUNICATIONS COMMISSION... § 80.231 Technical Requirements for Class B Automatic Identification System (AIS) equipment. (a) Class B Automatic Identification System (AIS) equipment must meet the technical requirements of IEC 62287...
47 CFR 80.231 - Technical Requirements for Class B Automatic Identification System (AIS) equipment.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Identification System (AIS) equipment. 80.231 Section 80.231 Telecommunication FEDERAL COMMUNICATIONS COMMISSION... § 80.231 Technical Requirements for Class B Automatic Identification System (AIS) equipment. (a) Class B Automatic Identification System (AIS) equipment must meet the technical requirements of IEC 62287...
47 CFR 80.231 - Technical Requirements for Class B Automatic Identification System (AIS) equipment.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Identification System (AIS) equipment. 80.231 Section 80.231 Telecommunication FEDERAL COMMUNICATIONS COMMISSION... § 80.231 Technical Requirements for Class B Automatic Identification System (AIS) equipment. (a) Class B Automatic Identification System (AIS) equipment must meet the technical requirements of IEC 62287...
47 CFR 15.515 - Technical requirements for vehicular radar systems.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 47 Telecommunication 1 2014-10-01 2014-10-01 false Technical requirements for vehicular radar... DEVICES Ultra-Wideband Operation § 15.515 Technical requirements for vehicular radar systems. (a..., changing gears, or engaging a turn signal. (b) The UWB bandwidth of a vehicular radar system operating...
47 CFR 15.515 - Technical requirements for vehicular radar systems.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 47 Telecommunication 1 2013-10-01 2013-10-01 false Technical requirements for vehicular radar... DEVICES Ultra-Wideband Operation § 15.515 Technical requirements for vehicular radar systems. (a..., changing gears, or engaging a turn signal. (b) The UWB bandwidth of a vehicular radar system operating...
47 CFR 15.515 - Technical requirements for vehicular radar systems.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 47 Telecommunication 1 2012-10-01 2012-10-01 false Technical requirements for vehicular radar... DEVICES Ultra-Wideband Operation § 15.515 Technical requirements for vehicular radar systems. (a..., changing gears, or engaging a turn signal. (b) The UWB bandwidth of a vehicular radar system operating...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 5 2010-10-01 2010-10-01 false Training and technical assistance for unsuccessful... REQUIREMENTS Enforcement Procedures § 493.1838 Training and technical assistance for unsuccessful participation... may require the laboratory to undertake training of its personnel, or to obtain necessary technical...
Code of Federal Regulations, 2010 CFR
2010-04-01
... agreements and technical assistance agreements. 124.8 Section 124.8 Foreign Relations DEPARTMENT OF STATE... Clauses required both in manufacturing license agreements and technical assistance agreements. The following statements must be included both in manufacturing license agreements and in technical assistance...
9 CFR 351.16 - Certificate required for shipments of technical animal fat.
Code of Federal Regulations, 2010 CFR
2010-01-01
... technical animal fat. 351.16 Section 351.16 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE... AND VOLUNTARY INSPECTION AND CERTIFICATION CERTIFICATION OF TECHNICAL ANIMAL FATS FOR EXPORT Transportation and Exportation of Certified Technical Animal Fat § 351.16 Certificate required for shipments of...
9 CFR 351.16 - Certificate required for shipments of technical animal fat.
Code of Federal Regulations, 2012 CFR
2012-01-01
... technical animal fat. 351.16 Section 351.16 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE... AND VOLUNTARY INSPECTION AND CERTIFICATION CERTIFICATION OF TECHNICAL ANIMAL FATS FOR EXPORT Transportation and Exportation of Certified Technical Animal Fat § 351.16 Certificate required for shipments of...
9 CFR 351.16 - Certificate required for shipments of technical animal fat.
Code of Federal Regulations, 2011 CFR
2011-01-01
... technical animal fat. 351.16 Section 351.16 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE... AND VOLUNTARY INSPECTION AND CERTIFICATION CERTIFICATION OF TECHNICAL ANIMAL FATS FOR EXPORT Transportation and Exportation of Certified Technical Animal Fat § 351.16 Certificate required for shipments of...
9 CFR 351.16 - Certificate required for shipments of technical animal fat.
Code of Federal Regulations, 2014 CFR
2014-01-01
... technical animal fat. 351.16 Section 351.16 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE... AND VOLUNTARY INSPECTION AND CERTIFICATION CERTIFICATION OF TECHNICAL ANIMAL FATS FOR EXPORT Transportation and Exportation of Certified Technical Animal Fat § 351.16 Certificate required for shipments of...
9 CFR 351.16 - Certificate required for shipments of technical animal fat.
Code of Federal Regulations, 2013 CFR
2013-01-01
... technical animal fat. 351.16 Section 351.16 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE... AND VOLUNTARY INSPECTION AND CERTIFICATION CERTIFICATION OF TECHNICAL ANIMAL FATS FOR EXPORT Transportation and Exportation of Certified Technical Animal Fat § 351.16 Certificate required for shipments of...
Radiological control manual. Revision 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kloepping, R.
1996-05-01
This Lawrence Berkeley National Laboratory Radiological Control Manual (LBNL RCM) has been prepared to provide guidance for site-specific additions, supplements and interpretation of the DOE Radiological Control Manual. The guidance provided in this manual is one methodology to implement the requirements given in Title 10 Code of Federal Regulations Part 835 (10 CFR 835) and the DOE Radiological Control Manual. Information given in this manual is also intended to provide demonstration of compliance to specific requirements in 10 CFR 835. The LBNL RCM (Publication 3113) and LBNL Health and Safety Manual Publication-3000 form the technical basis for the LBNL RPPmore » and will be revised as necessary to ensure that current requirements from Rules and Orders are represented. The LBNL RCM will form the standard for excellence in the implementation of the LBNL RPP.« less
15 CFR 911.8 - Technical requirements.
Code of Federal Regulations, 2012 CFR
2012-01-01
... PROCEDURES CONCERNING USE OF THE NOAA SPACE-BASED DATA COLLECTION SYSTEMS § 911.8 Technical requirements. (a) All platform operators of the NOAA DCS must use a data collection platform radio set whose technical...
15 CFR 911.8 - Technical requirements.
Code of Federal Regulations, 2013 CFR
2013-01-01
... PROCEDURES CONCERNING USE OF THE NOAA SPACE-BASED DATA COLLECTION SYSTEMS § 911.8 Technical requirements. (a) All platform operators of the NOAA DCS must use a data collection platform radio set whose technical...
15 CFR 911.8 - Technical requirements.
Code of Federal Regulations, 2014 CFR
2014-01-01
... PROCEDURES CONCERNING USE OF THE NOAA SPACE-BASED DATA COLLECTION SYSTEMS § 911.8 Technical requirements. (a) All platform operators of the NOAA DCS must use a data collection platform radio set whose technical...
15 CFR 911.8 - Technical requirements.
Code of Federal Regulations, 2011 CFR
2011-01-01
... PROCEDURES CONCERNING USE OF THE NOAA SPACE-BASED DATA COLLECTION SYSTEMS § 911.8 Technical requirements. (a) All platform operators of the NOAA DCS must use a data collection platform radio set whose technical...
15 CFR 911.8 - Technical requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... PROCEDURES CONCERNING USE OF THE NOAA SPACE-BASED DATA COLLECTION SYSTEMS § 911.8 Technical requirements. (a) All platform operators of the NOAA DCS must use a data collection platform radio set whose technical...
Aliakbari, Fatemeh; Bahrami, Masoud; Aein, Fereshteh; Khankeh, Hamidreza
2014-11-01
Today disasters are a part of many people's lives. Iran has a long history of disaster events and nurses are one of the most significant groups within the Iranian disaster relief operations, providing immediate and long-term care for those affected by the disaster. However, the technical competence of Iranian nurses and their training for this work has received little attention. This article presents the results of a study that aims to explore this context. A qualitative study was conducted using in-depth interviews to collect data from 30 nurses, who were deliberately selected from the health centers affiliated to the Isfahan University of Medical Sciences. Themes were identified using the conventional qualitative content analysis. The trustworthiness of the study was supported by considering the auditability, neutrality, consistency, and transferability. The study lasted from 2011 to 2012. Data analysis undertaken for the qualitative study resulted in the identification of five main themes, which included: (1) Management competences, (2) ethical and legal competences, (3) team working, and (4) personal abilities and the specific technical competences presented in this report. This report presents an overview of the nursing technical capabilities required for Iranian nurses during disaster relief. It is argued that additional competencies are required for nurses who care in high-risk situations, including disasters. Nurses need to prepare themselves more effectively to be responsible and effective in nursing care.
45 CFR 162.920 - Availability of implementation specifications and operating rules.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Technical Report Type 3. The implementation specifications for the ASC X12N and the ASC X12 Standards for Electronic Data Interchange Technical Report Type 3 (and accompanying Errata or Type 1 Errata) may be... charged for all implementation specifications, including Technical Reports Type 3. Charging for such...
10 CFR 50.36a - Technical specifications on effluents from nuclear power reactors.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 1 2012-01-01 2012-01-01 false Technical specifications on effluents from nuclear power reactors. 50.36a Section 50.36a Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND...; Ineligibility of Certain Applicants § 50.36a Technical specifications on effluents from nuclear power reactors...
10 CFR 50.36a - Technical specifications on effluents from nuclear power reactors.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 1 2013-01-01 2013-01-01 false Technical specifications on effluents from nuclear power reactors. 50.36a Section 50.36a Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND...; Ineligibility of Certain Applicants § 50.36a Technical specifications on effluents from nuclear power reactors...
TECHNICAL MANPOWER IN NEW YORK STATE. VOLUME II.
ERIC Educational Resources Information Center
AMATULLI, ANGELO; AND OTHERS
THE JOB CONTENT OF THE TECHNICAL OCCUPATIONS AND THE TECHNICAL SKILLS AND SUBJECT MATTER KNOWLEDGES REQUIRED ARE BASED PRIMARILY ON INFORMATION SUPPLIED BY EMPLOYERS FROM 17,414 ESTABLISHMENTS IN NEW YORK STATE. DATA ARE ALSO GIVEN ON GRADE STRUCTURE, EDUCATION AND EXPERIENCE REQUIREMENTS, TESTS AND LICENSES REQUIRED FOR THE JOB, SOURCES OF…
ERIC Educational Resources Information Center
Savage, Gerald J.; Seible, Marcea K.
2010-01-01
This article reports a study of internship requirements in technical communication programs compared with three established professions and one emerging profession that have certification or licensing requirements for practitioners. The study addresses three questions about technical communication internship programs: 1) Are internships offered as…
47 CFR 25.215 - Technical requirements for space stations in the Direct Broadcast Satellite Service.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 47 Telecommunication 2 2012-10-01 2012-10-01 false Technical requirements for space stations in... Technical requirements for space stations in the Direct Broadcast Satellite Service. In addition to § 25.148(f), space station antennas operating in the Direct Broadcast Satellite Service must be designed to...
47 CFR 25.215 - Technical requirements for space stations in the Direct Broadcast Satellite Service.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 47 Telecommunication 2 2013-10-01 2013-10-01 false Technical requirements for space stations in... Technical requirements for space stations in the Direct Broadcast Satellite Service. In addition to § 25.148(f), space station antennas operating in the Direct Broadcast Satellite Service must be designed to...
47 CFR 25.215 - Technical requirements for space stations in the Direct Broadcast Satellite Service.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 2 2011-10-01 2011-10-01 false Technical requirements for space stations in... Technical requirements for space stations in the Direct Broadcast Satellite Service. In addition to § 25.148(f), space station antennas operating in the Direct Broadcast Satellite Service must be designed to...
47 CFR 25.215 - Technical requirements for space stations in the Direct Broadcast Satellite Service.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 2 2010-10-01 2010-10-01 false Technical requirements for space stations in... Technical requirements for space stations in the Direct Broadcast Satellite Service. In addition to § 25.148(f), space station antennas operating in the Direct Broadcast Satellite Service must be designed to...
38 CFR 61.52 - Threshold requirements for technical assistance grant applications.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 38 Pensions, Bonuses, and Veterans' Relief 2 2011-07-01 2011-07-01 false Threshold requirements for technical assistance grant applications. 61.52 Section 61.52 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS AFFAIRS (CONTINUED) VA HOMELESS PROVIDERS GRANT AND PER DIEM PROGRAM § 61.52 Threshold requirements for technical assistanc...
UAS Integration into the NAS Project
NASA Technical Reports Server (NTRS)
Bauer, Jeff
2010-01-01
The goal of the UAS Integration in the NAS Project is to contribute capabilities that reduce technical barriers related to the safety and operational challenges associated with enabling routine UAS access to the NAS This goal will be accomplished through a two-phased approach of system-level integration of key concepts, technologies and/or procedures, and demonstrations of integrated capabilities in an operationally relevant environment. Technical objectives include: PHASE 1: a) Validating the key technical areas identified by this project. System-level analyses, a State of the Art Analysis (SOAA), and a ConOps will identify the challenges and barriers preventing routine UAS access to the NAS. b) Developing a national roadmap and gap analysis identifying specific deliverables in the area of operations, procedures, and technologies that will impact future policy decisions. PHASE 2: a) Provide regulators with a methodology for developing airworthiness requirements for UAS and data to support development of certifications standards and regulatory guidance. b) Provide systems-level integrated testing of concepts and/or capabilities that address barriers to routine access to the NAS. Through simulation and flight testing, address issues including separation assurance, communications requirements, and Pilot Aircraft Interfaces (PAIs) in operationally relevant environments
38 CFR 61.52 - Technical assistance grant application packages-threshold requirements.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 38 Pensions, Bonuses, and Veterans' Relief 2 2014-07-01 2014-07-01 false Technical assistance grant application packages-threshold requirements. 61.52 Section 61.52 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS AFFAIRS (CONTINUED) VA HOMELESS PROVIDERS GRANT AND PER DIEM PROGRAM Technical Assistance Grants § 61.52 Technical...
38 CFR 61.52 - Technical assistance grant application packages-threshold requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 38 Pensions, Bonuses, and Veterans' Relief 2 2013-07-01 2013-07-01 false Technical assistance grant application packages-threshold requirements. 61.52 Section 61.52 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS AFFAIRS (CONTINUED) VA HOMELESS PROVIDERS GRANT AND PER DIEM PROGRAM Technical Assistance Grants § 61.52 Technical...
44 CFR 65.3 - Requirement to submit new technical data.
Code of Federal Regulations, 2011 CFR
2011-10-01
... available, a community shall notify the Administrator of the changes by submitting technical or scientific... IDENTIFICATION AND MAPPING OF SPECIAL HAZARD AREAS § 65.3 Requirement to submit new technical data. A community's...
Scientific and Technical Development of the Next Generation Space Telescope
NASA Technical Reports Server (NTRS)
Burg, Richard
2003-01-01
The Next Generation Space Telescope (NGST) is part of the Origins program and is the key mission to discover the origins of galaxies in the Universe. It is essential that scientific requirements be translated into technical specifications at the beginning of the program and that there is technical participation by astronomers in the design and modeling of the observatory. During the active time period of this grant, the PI participated in the NGST program at GSFC by participating in the development of the Design Reference Mission, the development of the full end-to-end model of the observatory, the design trade-off based on the modeling, the Science Instrument Module definition and modeling, the study of proto-mission and test-bed development, and by participating in meetings including quarterly reviews and support of the NGST SWG. This work was documented in a series of NGST Monographs that are available on the NGST web site.
Production of technical grade phosphoric acid from incinerator sewage sludge ash (ISSA).
Donatello, S; Tong, D; Cheeseman, C R
2010-01-01
The recovery of phosphorus from sewage sludge ash samples obtained from 7 operating sludge incinerators in the UK using a sulfuric acid washing procedure to produce a technical grade phosphoric acid product has been investigated. The influences of reaction time, sulfuric acid concentration, liquid to solid ratio and source of ISSA on P recovery have been examined. The optimised conditions were the minimum stoichiometric acid requirement, a reaction time of 120 min and a liquid to solid ratio of 20. Under these conditions, average recoveries of between 72% and 91% of total phosphorus were obtained. Product filtrate was purified by passing through a cation exchange column, concentrated to 80% H(3)PO(4) and compared with technical grade H(3)PO(4) specifications. The economics of phosphate recovery by this method are briefly discussed. 2010 Elsevier Ltd. All rights reserved.
A stochastic frontier analysis of technical efficiency of fish cage culture in Peninsular Malaysia.
Islam, Gazi Md Nurul; Tai, Shzee Yew; Kusairi, Mohd Noh
2016-01-01
Cage culture plays an important role in achieving higher output and generating more export earnings in Malaysia. However, the cost of fingerlings, feed and labour have increased substantially for cage culture in the coastal areas in Peninsular Malaysia. This paper uses farm level data gathered from Manjung, Perak and Kota Tinggi, Johor to investigate the technical efficiency of brackish water fish cage culture using the stochastic frontier approach. The technical efficiency was estimated and specifically the factors affecting technical inefficiencies of fish cage culture system in Malaysia was investigated. On average, 37 percent of the sampled fish cage farms are technically efficient. The results suggest very high degrees of technical inefficiency exist among the cage culturists. This implies that great potential exists to increase fish production through improved efficiency in cage culture management in Peninsular Malaysia. The results indicate that farmers obtained grouper fingerlings from other neighboring countries due to scarcity of fingerlings from wild sources. The cost of feeding for grouper (Epinephelus fuscoguttatus) requires relatively higher costs compared to seabass (Lates calcarifer) production in cage farms in the study areas. Initiatives to undertake extension programmes at the farm level are needed to help cage culturists in utilizing their resources more efficiently in order to substantially enhance their fish production.
An Organization's Extended (Soft) Competencies Model
NASA Astrophysics Data System (ADS)
Rosas, João; Macedo, Patrícia; Camarinha-Matos, Luis M.
One of the steps usually undertaken in partnerships formation is the assessment of organizations’ competencies. Typically considered competencies of a functional or technical nature, which provide specific outcomes can be considered as hard competencies. Yet, the very act of collaboration has its specific requirements, for which the involved organizations must be apt to exercise other type of competencies that affect their own performance and the partnership success. These competencies are more of a behavioral nature, and can be named as soft-competencies. This research aims at addressing the effects of the soft competencies on the performance of the hard ones. An extended competencies model is thus proposed, allowing the construction of adjusted competencies profiles, in which the competency levels are adjusted dynamically according to the requirements of collaboration opportunities.
Applications for the MATILDA robotic platform
NASA Astrophysics Data System (ADS)
Munkeby, Steve H.; Jones, Don; Bugg, George; Smith, Kathryn
2002-07-01
Most robotic platforms have, up to this point, been designed with emphasis placed on improving mobility technologies. Minimal emphasis has been placed on payloads and mission execution. Using a top-down approach, Mesa Associates, Inc. identified specific UGV mission applications and structured its MATILDA platform using these applications for vehicle mobility and motion control requirements. Specific applications identified for the MATILDA platform include: Target surveillance, explosive device neutralization, material pickup and transport, weapon transport and firing, and law enforcement. Current performance results, lessons-learned, technical hurdles, and future applications are examined.
NASA Technical Reports Server (NTRS)
1975-01-01
A separation method to provide reasonable yields of high specificity isoenzymes for the purpose of large scale, early clinical diagnosis of diseases and organic damage such as, myocardial infarction, hepatoma, muscular dystrophy, and infectous disorders is presented. Preliminary development plans are summarized. An analysis of required research and development and production resources is included. The costs of such resources and the potential profitability of a commercial space processing opportunity for electrophoretic separation of high specificity isoenzymes are reviewed.
Subsonic aircraft: Evolution and the matching of size to performance
NASA Technical Reports Server (NTRS)
Loftin, L. K., Jr.
1980-01-01
Methods for estimating the approximate size, weight, and power of aircraft intended to meet specified performance requirements are presented for both jet-powered and propeller-driven aircraft. The methods are simple and require only the use of a pocket computer for rapid application to specific sizing problems. Application of the methods is illustrated by means of sizing studies of a series of jet-powered and propeller-driven aircraft with varying design constraints. Some aspects of the technical evolution of the airplane from 1918 to the present are also briefly discussed.
Legal basis of the Advanced Therapies Regulation.
Jekerle, V; Schröder, C; Pedone, E
2010-01-01
Advanced therapy medicinal products consist of gene therapy, somatic cell therapy and tissue engineered products. Due to their specific manufacturing process and mode of action these products require specially tailored legislation. With Regulation (EC) No. 1394/2007, these needs have been met. Definitions of gene therapy, somatic cell therapy and tissue engineered products were laid down. A new committee, the Committee for Advanced Therapies, was founded, special procedures such as the certification procedure for small- and medium-sized enterprises were established and the technical requirements for Marketing Authorisation Applications (quality, non-clinical and clinical) were revised.
NASA Technical Reports Server (NTRS)
Adams, J. R.; Hawley, S. W.; Peterson, G. R.; Salinger, S. S.; Workman, R. A.
1971-01-01
A hardware and software specification covering requirements for the computer enhancement of structural weld radiographs was considered. Three scanning systems were used to digitize more than 15 weld radiographs. The performance of these systems was evaluated by determining modulation transfer functions and noise characteristics. Enhancement techniques were developed and applied to the digitized radiographs. The scanning parameters of spot size and spacing and film density were studied to optimize the information content of the digital representation of the image.
The Future Cybersecurity Workforce: Going Beyond Technical Skills for Successful Cyber Performance.
Dawson, Jessica; Thomson, Robert
2018-01-01
One of the challenges in writing an article reviewing the current state of cyber education and workforce development is that there is a paucity of quantitative assessment regarding the cognitive aptitudes, work roles, or team organization required by cybersecurity professionals to be successful. In this review, we argue that the people who operate within the cyber domain need a combination of technical skills, domain specific knowledge, and social intelligence to be successful. They, like the networks they operate, must also be reliable, trustworthy, and resilient. Defining the knowledge, skills, attributes, and other characteristics is not as simple as defining a group of technical skills that people can be trained on; the complexity of the cyber domain makes this a unique challenge. There has been little research devoted to exactly what attributes individuals in the cyber domain need. What research does exist places an emphasis on technical and engineering skills while discounting the important social and organizational influences that dictate success or failure in everyday settings. This paper reviews the literature on cyber expertise and cyber workforce development to identify gaps and then argues for the important contribution of social fit in the highly complex and heterogenous cyber workforce. We then identify six assumptions for the future of cybersecurity workforce development, including the requirement for systemic thinkers, team players, a love for continued learning, strong communication ability, a sense of civic duty, and a blend of technical and social skill. Finally, we make recommendations for social and cognitive metrics which may be indicative of future performance in cyber work roles to provide a roadmap for future scholars.
NASA Astrophysics Data System (ADS)
Houlton, H. R.; Ricci, J.; Wilson, C. E.; Keane, C.
2014-12-01
Professional development experiences, such as internships, research presentations and professional network building, are becoming increasingly important to enhance students' employability post-graduation. The practical, non-technical skills that are important for succeeding during these professional development experiences, such as public speaking, project management, ethical practices and writing, transition well and are imperative to the workplace. Thereby, graduates who have honed these skills are more competitive candidates for geoscience employment. Fortunately, the geoscience community recognizes the importance of these professional development opportunities and the skills required to successfully complete them, and are giving students the chance to practice non-technical skills while they are still enrolled in academic programs. The American Geosciences Institute has collected data regarding students' professional development experiences, including the preparation they receive in the corresponding non-technical skills. This talk will discuss the findings of two of AGI's survey efforts - the Geoscience Student Exit Survey and the Geoscience Careers Master's Preparation Survey (NSF: 1202707). Specifically, data highlighting the role played by internships, career opportunities and the complimentary non-technical skills will be discussed. As a practical guide, events informed by this research, such as AGI's professional development opportunities, networking luncheons and internships, will also be included.
An analysis of electronic document management in oncology care.
Poulter, Thomas; Gannon, Brian; Bath, Peter A
2012-06-01
In this research in progress, a reference model for the use of electronic patient record (EPR) systems in oncology is described. The model, termed CICERO, comprises technical and functional components, and emphasises usability, clinical safety and user acceptance. One of the functional components of the model-an electronic document and records management (EDRM) system-is monitored in the course of its deployment at a leading oncology centre in the UK. Specifically, the user requirements and design of the EDRM solution are described.The study is interpretative and forms part a wider research programme to define and validate the CICERO model. Preliminary conclusions confirm the importance of a socio-technical perspective in Onco-EPR system design.
13 CFR 306.2 - Award requirements.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 306.2 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION, DEPARTMENT OF COMMERCE TRAINING, RESEARCH AND TECHNICAL ASSISTANCE INVESTMENTS Local and National Technical Assistance § 306.2 Award requirements. EDA selects Projects for Local and National Technical Assistance Investments in...
13 CFR 306.2 - Award requirements.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 306.2 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION, DEPARTMENT OF COMMERCE TRAINING, RESEARCH AND TECHNICAL ASSISTANCE INVESTMENTS Local and National Technical Assistance § 306.2 Award requirements. EDA selects Projects for Local and National Technical Assistance Investments in...
13 CFR 306.2 - Award requirements.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 306.2 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION, DEPARTMENT OF COMMERCE TRAINING, RESEARCH AND TECHNICAL ASSISTANCE INVESTMENTS Local and National Technical Assistance § 306.2 Award requirements. EDA selects Projects for Local and National Technical Assistance Investments in...
13 CFR 306.2 - Award requirements.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 306.2 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION, DEPARTMENT OF COMMERCE TRAINING, RESEARCH AND TECHNICAL ASSISTANCE INVESTMENTS Local and National Technical Assistance § 306.2 Award requirements. EDA selects Projects for Local and National Technical Assistance Investments in...
Analysis of Technical Specifications of the Egyptian and French Electronic Storybooks (e-Storybook)
ERIC Educational Resources Information Center
Atta, Mohammed Mahmoud; Abd El Wahab, Shaimaa Mahmoud
2015-01-01
This research aims at analysing technical specifications in a sample of Egyptian and French electronic storybooks (e-storybooks), to identify similarities and differences in technical specifications of children's e-storybooks and create a verified analysis list to be used for evaluation of e-storybooks. For this purpose, 32 e-storybooks in CD…
Systems Maintenance Automated Repair Tasks (SMART)
NASA Technical Reports Server (NTRS)
Schuh, Joseph; Mitchell, Brent; Locklear, Louis; Belson, Martin A.; Al-Shihabi, Mary Jo Y.; King, Nadean; Norena, Elkin; Hardin, Derek
2010-01-01
SMART is a uniform automated discrepancy analysis and repair-authoring platform that improves technical accuracy and timely delivery of repair procedures for a given discrepancy (see figure a). SMART will minimize data errors, create uniform repair processes, and enhance the existing knowledge base of engineering repair processes. This innovation is the first tool developed that links the hardware specification requirements with the actual repair methods, sequences, and required equipment. SMART is flexibly designed to be useable by multiple engineering groups requiring decision analysis, and by any work authorization and disposition platform (see figure b). The organizational logic creates the link between specification requirements of the hardware, and specific procedures required to repair discrepancies. The first segment in the SMART process uses a decision analysis tree to define all the permutations between component/ subcomponent/discrepancy/repair on the hardware. The second segment uses a repair matrix to define what the steps and sequences are for any repair defined in the decision tree. This segment also allows for the selection of specific steps from multivariable steps. SMART will also be able to interface with outside databases and to store information from them to be inserted into the repair-procedure document. Some of the steps will be identified as optional, and would only be used based on the location and the current configuration of the hardware. The output from this analysis would be sent to a work authoring system in the form of a predefined sequence of steps containing required actions, tools, parts, materials, certifications, and specific requirements controlling quality, functional requirements, and limitations.
ERIC Educational Resources Information Center
Pugh, Debra; Hamstra, Stanley J.; Wood, Timothy J.; Humphrey-Murto, Susan; Touchie, Claire; Yudkowsky, Rachel; Bordage, Georges
2015-01-01
Internists are required to perform a number of procedures that require mastery of technical and non-technical skills, however, formal assessment of these skills is often lacking. The purpose of this study was to develop, implement, and gather validity evidence for a procedural skills objective structured clinical examination (PS-OSCE) for internal…
Crew Transportation Technical Standards and Design Evaluation Criteria
NASA Technical Reports Server (NTRS)
Lueders, Kathryn L.; Thomas, Rayelle E. (Compiler)
2015-01-01
Crew Transportation Technical Standards and Design Evaluation Criteria contains descriptions of technical, safety, and crew health medical processes and specifications, and the criteria which will be used to evaluate the acceptability of the Commercial Providers' proposed processes and specifications.
The technology application process as applied to a firefighter's breathing system
NASA Technical Reports Server (NTRS)
Mclaughlan, P. B.
1974-01-01
The FBS Program indicated that applications of advanced technology can result in an improved FBS that will satisfy the requirements defined by municipal fire departments. To accomplish this technology transfer, a substantial commitment of resources over an extended period of time has been required. This program has indicated that the ability of NASA in terms of program management such as requirement definition, system analysis, and industry coordination may play as important a role as specific sources of hardware technology. As a result of the FBS program, a sequence of milestones was passed that may have applications as generalized milestones and objectives for any technical application program.
Moving Target Information Exploitation Electronic Learning
2005-10-01
Traditional - ISR WebTAS – eLearning ................................................................. 6 MTIX e- Learning Technical Requirements...than on a specific schedule, so learners can take the curriculum when needed and at their own pace . E- Learning is a form of instructional authoring...can save training expenses, because it can be used over and over again. E- Learning also allows the user to study at his or her own convenience
ERIC Educational Resources Information Center
Yang, Eunyoung
2010-01-01
In updating fashion and apparel related design programs, many educators are striving to address the perspective of the fashion industry to obtain the career-specific skill and knowledge requirements sought by employers when hiring college or university graduates. Identifying such competencies from the view of fashion industry professionals as well…
Laboratory equipment maintenance contracts.
Boudreau, D A; Scheer, W D; Catrou, P G
1985-12-01
The increasing level of technical sophistication and complexity found in clinical laboratory instrumentation today more than ever demands careful attention to maintenance service needs. The time-worn caution for careful definition of requirements for acquisition of a system should also carry over to acquisition of maintenance service. Guidelines are presented for specifications of terms and conditions for maintenance service from the perspective of the laboratorian in the automated clinical laboratory.
NASA Astrophysics Data System (ADS)
Asmi, A.; Kutsch, W. L.
2015-12-01
Environmental Research Infrastructures are often built as bottom-up initiatives to provide products for specific target group, which often is very discipline specific. However, the societal or environmental challenges are typically not concentrated on specific disciplines, and require usage of data sets from many RIs. ENVRI PLUS is an initiative where the European environmental RIs work together to provide common technical background (in physical observation technologies and in data products and descriptions) to make the RI products more usable to user groups outside of the original RI target groups. ENVRI PLUS also includes many policy and dissemination concentrated actions to make the RI operations coherent and understandable to both scientists and other potential users. The actions include building common technological capital of the RIs (physical and data-oriented), creating common access procedures (especially for cross-diciplinary access), developing ethical guidelines and related policies, distributing know-how between RIs and building common communication and collaboration system for European environmental RIs. All ENVRI PLUS products are free to use, e.g. for use of new or existing environmental RIs worldwide.
Production of Copper-Plated Beamline Bellows and Spools for LCLS-II
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wilson, Katherine M.; Carpenter, Brian C.; Daly, Ed
The SLAC National Accelerator Laboratory is currently constructing a major upgrade to its accelerator, the Linac Coherent Light Source II (LCLS-II). Several Department of Energy national laboratories, including the Thomas Jefferson National Accelerator Facility (JLab) and Fermi National Accelerator Laboratory (FNAL), are participating in this project. The 1.3-GHz cryomodules for this project consist of eight cavities separated by bellows (expansion joints) and spools (tube sections), which are copper plated for RF conduction. JLab is responsible for procurement of these bellows and spools, which are delivered to JLab and FNAL for assembly into cryomodules. Achieving accelerator-grade copper plating is always amore » challenge and requires careful specification of requirements and application of quality control processes. Due to the demanding technical requirements of this part, JLab implemented procurement strategies to make the process more efficient as well as provide process redundancy. This paper discusses the manufacturing challenges that were encountered and resolved, as well as the strategies that were employed to minimize the impact of any technical issues.« less
Degrees of systematic thoroughness: A text analysis of student technical science writing
NASA Astrophysics Data System (ADS)
Esch, Catherine Julia
This dissertation investigates student technical science writing and use of evidence. Student writers attended a writing-intensive undergraduate university oceanography course where they were required to write a technical paper drawing from an instructor-designed software program, Our Dynamic Planet. This software includes multiple interactive geological data sets relevant to plate tectonics. Through qualitative text analysis of students science writing, two research questions frame the study asking: How are the papers textually structured? Are there distinctions between high- and low-rated papers? General and specific text characteristics within three critical sections of the technical paper are identified and analyzed (Observations, Interpretations, Conclusions). Specific text characteristics consist of typical types of figures displayed in the papers, and typical statements within each paper section. Data gathering consisted of collecting 15 student papers which constitute the population of study. An analytical method was designed to manage and analyze the text characteristics. It has three stages: identifying coding categories, re-formulating the categories, and configuring categories. Three important elements emerged that identified notable distinctions in paper quality: data display and use, narration of complex geological feature relationships, and overall organization of text structure. An inter-rater coding concordance check was conducted, and showed high concordance ratios for the coding of each section: Observations = 0.95; Interpretations = 0.93; and Conclusions = 0.87. These categories collectively reveal a larger pattern of general differences in the paper quality levels (high, low, medium). This variation in the quality of papers demonstrates degrees of systematic thoroughness, which is defined as how systematically each student engages in the tasks of the assignment, and how thoroughly and consistently the student follows through on that systematic commitment. Characterizations of each paper level indicate areas that can be explored to develop an explicit instructional pedagogy to support a greater number of low and medium level students. Implications suggest most students require greater explicit instruction. This involves having students pay more attention to detail, and to demonstrate greater follow through in order to produce a solid scientific argument in their technical papers.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-17
... Specifications Combustion Engineering Plants.'' Specifically, the proposed change revises various TSs to add a... Technical Details TSTF-426, Revision 5, is applicable to all Combustion Engineering- designed nuclear power...
Reformation of Regulatory Technical Standards for Nuclear Power Generation Equipments in Japan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mikio Kurihara; Masahiro Aoki; Yu Maruyama
2006-07-01
Comprehensive reformation of the regulatory system has been introduced in Japan in order to apply recent technical progress in a timely manner. 'The Technical Standards for Nuclear Power Generation Equipments', known as the Ordinance No.622) of the Ministry of International Trade and Industry, which is used for detailed design, construction and operating stage of Nuclear Power Plants, was being modified to performance specifications with the consensus codes and standards being used as prescriptive specifications, in order to facilitate prompt review of the Ordinance with response to technological innovation. The activities on modification were performed by the Nuclear and Industrial Safetymore » Agency (NISA), the regulatory body in Japan, with support of the Japan Nuclear Energy Safety Organization (JNES), a technical support organization. The revised Ordinance No.62 was issued on July 1, 2005 and is enforced from January 1 2006. During the period from the issuance to the enforcement, JNES carried out to prepare enforceable regulatory guide which complies with each provisions of the Ordinance No.62, and also made technical assessment to endorse the applicability of consensus codes and standards, in response to NISA's request. Some consensus codes and standards were re-assessed since they were already used in regulatory review of the construction plan submitted by licensee. Other consensus codes and standards were newly assessed for endorsement. In case that proper consensus code or standards were not prepared, details of regulatory requirements were described in the regulatory guide as immediate measures. At the same time, appropriate standards developing bodies were requested to prepare those consensus code or standards. Supplementary note which provides background information on the modification, applicable examples etc. was prepared for convenience to the users of the Ordinance No. 62. This paper shows the activities on modification and the results, following the NISA's presentation at ICONE-13 that introduced the framework of the performance specifications and the modification process of the Ordinance NO. 62. (authors)« less
Space Fence PDR Concept Development Phase
NASA Astrophysics Data System (ADS)
Haines, L.; Phu, P.
2011-09-01
The Space Fence, a major Air Force acquisition program, will become the dominant low-earth orbit uncued sensor in the space surveillance network (SSN). Its primary objective is to provide a 24/7 un-cued capability to find, fix, and track small objects in low earth orbit to include emerging and evolving threats, as well as the rapidly growing population of orbital debris. Composed of up to two geographically dispersed large-scale S-band phased array radars, this new system-of-systems concept will provide comprehensive Space Situational Awareness through net-centric operations and integrated decision support. Additionally, this program will facilitate cost saving force structure changes in the SSN, specifically including the decommissioning of very-high frequency VHF Air Force Space Surveillance System (AFSSS). The Space Fence Program Office entered a Preliminary Design Review (PDR) concept development phase in January 2011 to achieve the delivery of the Initial Operational Capability (IOC) expected in FY17. Two contractors were awarded to perform preliminary system design, conduct radar performance analyses and evaluations, and develop a functional PDR radar system prototype. The key objectives for the Phase A PDR effort are to reduce Space Fence total program technical, cost, schedule, and performance risk. The overall program objective is to achieve a preliminary design that demonstrates sufficient technical and manufacturing maturity and that represents a low risk, affordable approach to meet the Space Fence Technical Requirements Document (TRD) requirements for the final development and production phase to begin in 3QFY12. This paper provides an overview of the revised Space Fence program acquisition strategy for the Phase-A PDR phase to IOC, the overall program milestones and major technical efforts. In addition, the key system trade studies and modeling/simulation efforts undertaken during the System Design Requirement (SDR) phase to address and mitigate technical challenges of the Space Fence System will also be discussed. Examples include radar system optimization studies, modeling and simulation for system performance assessment, investigation of innovative Astrodynamics algorithms for initial orbit determination and observation correlation.
47 CFR 68.604 - Requirements for submitting technical criteria.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 3 2010-10-01 2010-10-01 false Requirements for submitting technical criteria. 68.604 Section 68.604 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER...) may establish technical criteria for terminal equipment pursuant to ANSI consensus decision-making...
7 CFR 652.21 - Certification criteria and requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... must: (1) Have the required technical training, education, and experience to perform the level of technical assistance for which certification is sought; (2) Meet any applicable professional or business... CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES TECHNICAL SERVICE PROVIDER ASSISTANCE...
A haptic interface for virtual simulation of endoscopic surgery.
Rosenberg, L B; Stredney, D
1996-01-01
Virtual reality can be described as a convincingly realistic and naturally interactive simulation in which the user is given a first person illusion of being immersed within a computer generated environment While virtual reality systems offer great potential to reduce the cost and increase the quality of medical training, many technical challenges must be overcome before such simulation platforms offer effective alternatives to more traditional training means. A primary challenge in developing effective virtual reality systems is designing the human interface hardware which allows rich sensory information to be presented to users in natural ways. When simulating a given manual procedure, task specific human interface requirements dictate task specific human interface hardware. The following paper explores the design of human interface hardware that satisfies the task specific requirements of virtual reality simulation of Endoscopic surgical procedures. Design parameters were derived through direct cadaver studies and interviews with surgeons. Final hardware design is presented.
Approach to developing reliable space reactor power systems
NASA Technical Reports Server (NTRS)
Mondt, Jack F.; Shinbrot, Charles H.
1991-01-01
During Phase II, the Engineering Development Phase, the SP-100 Project has defined and is pursuing a new approach to developing reliable power systems. The approach to developing such a system during the early technology phase is described along with some preliminary examples to help explain the approach. Developing reliable components to meet space reactor power system requirements is based on a top-down systems approach which includes a point design based on a detailed technical specification of a 100-kW power system. The SP-100 system requirements implicitly recognize the challenge of achieving a high system reliability for a ten-year lifetime, while at the same time using technologies that require very significant development efforts. A low-cost method for assessing reliability, based on an understanding of fundamental failure mechanisms and design margins for specific failure mechanisms, is being developed as part of the SP-100 Program.
Antenna Electronics Concept for the Next-Generation Very Large Array
NASA Astrophysics Data System (ADS)
Beasley, Anthony J.; Jackson, Jim; Selina, Robert
2017-01-01
The National Radio Astronomy Observatory (NRAO), in collaboration with its international partners, completed two major projects over the past decade: the sensitivity upgrade for the Karl Jansky Very Large Array (VLA) and the construction of the Atacama Large Millimeter/Sub-Millimeter Array (ALMA). The NRAO is now considering the scientific potential and technical feasibility of a next-generation VLA (ngVLA) with an emphasis on thermal imaging at milli-arcsecond resolution. The preliminary goals for the ngVLA are to increase both the system sensitivity and angular resolution of the VLA tenfold and to cover a frequency range of 1.2-116 GHz.A number of key technical challenges have been identified for the project. These include cost-effective antenna manufacturing (in the hundreds), suitable wide-band feed and receiver designs, broad-band data transmission, and large-N correlators. Minimizing the overall operations cost is also a fundamental design requirement.The designs of the antenna electronics, reference distribution system, and data transmission system are anticipated to be major construction and operations cost drivers for the facility. The electronics must achieve a high level of performance, while maintaining low operation and maintenance costs and a high level of reliability. Additionally, due to the uncertainty in the feasibility of wideband receivers, advancements in digitizer technology, and budget constraints, the hardware system architecture should be scalable to the number of receiver bands and the speed and resolution of available digitizers.Here, we present the projected performance requirements of the ngVLA, a proposed block diagram for the instrument’s electronics systems, parameter tradeoffs within the system specifications, and areas of technical risk where technical advances may be required for successful production and installation.
Grant, P M; Field, T G; Green, R D; Rollin, B E
2000-06-01
Any thorough examination of the present and future of agricultural education must certainly begin with a look into its past. Since the creation of the United States, many leading American philosophers have viewed a strong agrarian culture as the bedrock of American vigor. These same philosophers repeatedly noted the significance of comprehensive agricultural education to a nation rich in agricultural wealth. The signing of the Agricultural Colleges Act legitimized the concept of formal education in the agricultural sciences and provided funding for such education. The Act, which came to be known as the Morrill Act, after one of its primary authors, stressed the importance of comprehensive education. In fact, the inclusion of liberal studies was specifically mentioned in the Morrill Act and was defended repeatedly by Morrill himself. Comprehensive education prevented graduating technically trained students who were lacking in the basic outcomes of education--critical, comprehensive problem solving, cohesive thought, and effective communication. However, throughout history, the demands of a growing population coupled with rapid advancements in scientific knowledge led to a gradual move away from comprehensive education in agricultural sciences toward increasing specialization, resulting in more narrowly trained students. Today's agricultural students are technically well versed but often lack the skill and knowledge required for cohesive thought and critical problem solving. Addressing the multitude of challenges facing leaders in the future of agriculture requires much more than technical skill. These challenges require quick, yet careful thinkers and communicators who can respond to changing market structure and consumer demand in a dynamic way. Students who are a product of a conscious move toward amalgamation of burgeoning scientific knowledge and technical prowess with an integrative education emphasizing relationships between disciplines would better serve tomorrow's agriculture.
Walter, U; Noachtar, S; Hinrichs, H
2018-02-01
The guidelines of the German Medical Association and the German Society for Clinical Neurophysiology and Functional Imaging (DGKN) require a high procedural and technical standard for electroencephalography (EEG) as an ancillary method for diagnosing the irreversible cessation of brain function (brain death). Nowadays, digital EEG systems are increasingly being applied in hospitals. So far it is unclear to what extent the digital EEG systems currently marketed in Germany meet the guidelines for diagnosing brain death. In the present article, the technical und safety-related requirements for digital EEG systems and the EEG documentation for diagnosing brain death are described in detail. On behalf of the DGKN, the authors sent out a questionnaire to all identified distributors of digital EEG systems in Germany with respect to the following technical demands: repeated recording of the calibration signals during an ongoing EEG recording, repeated recording of all electrode impedances during an ongoing EEG recording, assessability of intrasystem noise and galvanic isolation of measurement earthing from earthing conductor (floating input). For 15 of the identified 20 different digital EEG systems the specifications were provided by the distributors (among them all distributors based in Germany). All of these EEG systems are provided with a galvanic isolation (floating input). The internal noise can be tested with all systems; however, some systems do not allow repeated recording of the calibration signals and/or the electrode impedances during an ongoing EEG recording. The majority but not all of the currently available digital EEG systems offered for clinical use are eligible for use in brain death diagnostics as per German guidelines.
48 CFR 209.505-4 - Obtaining access to proprietary information.
Code of Federal Regulations, 2011 CFR
2011-10-01
...) Non-disclosure requirements for contractors accessing third party proprietary technical data or... may be required to enter into non-disclosure agreements directly with the third party asserting restrictions on limited rights technical data, commercial technical data, or restricted rights computer...
Closed Loop Requirements and Analysis Management
NASA Technical Reports Server (NTRS)
Lamoreaux, Michael; Verhoef, Brett
2015-01-01
Effective systems engineering involves the use of analysis in the derivation of requirements and verification of designs against those requirements. The initial development of requirements often depends on analysis for the technical definition of specific aspects of a product. Following the allocation of system-level requirements to a product's components, the closure of those requirements often involves analytical approaches to verify that the requirement criteria have been satisfied. Meanwhile, changes that occur in between these two processes need to be managed in order to achieve a closed-loop requirement derivation/verification process. Herein are presented concepts for employing emerging Team center capabilities to jointly manage requirements and analysis data such that analytical techniques are utilized to effectively derive and allocate requirements, analyses are consulted and updated during the change evaluation processes, and analyses are leveraged during the design verification process. Recommendations on concept validation case studies are also discussed.
Lu, Y; Zhang, M
2016-08-20
Objective: To study the applicability, the high frequency used content, the feasibility, and issues needed to be solved of the standard of GBZ 1-2010, aiming to provide technical evidence for the revision of GBZ1. Methods: In the study, the data were collected by referring to the literature database and the questionnaire from June 2013 to June 2015. There were 2 surveys carried out in the study, with methods including questionnaire survey and specific interview. The investigation methods include the paper version of the questionnaire by mail, the electronic version of the questionnaire by e-mail, and the online survey. And 111 questionnaires were collected. Results: In total, the applicability survey (the first survey) received 156 suggestions covering 76 items from 23 facilities, and 13 key technical issues were summarized to be solved as priorities. In the application survey (the second survey) , the leading three jobs using GBZ 1-2010 were the occupational hazards evaluation for constructive project (82.0%) , lecturing/training (65.8%) , occupational hazards monitoring (64.9%) , respectively. The high frequency used contents of GBZ 1-2010 were the sixth part "the basic hygienic requirements for workplace" (90.1%) , the fifth part "site selection, overall layout and workshop design" (87.4%) , the seventh part "the basic hygienic requirements for welfare room" (85.6%) , respectively. In the results of feasibility, scores of the fourth part "the general rules" , the fifth part "site selection, overall layout and workshop design" , the sixth part "the basic hygienic requirements for workplace" , the seventh part "the basic hygienic requirements for welfare room" , the eighth "emergency rescue" , annex A "the correct use instructions" , annex B "buffer zone standards for industrial enterprises" were 2.6, 3.1, 3.5, 3.8, 3.2, 3.3, 2.6, respectively. Among 111 questionnaires, the parts needed to be modified as priories were the fifth part "site selection, overall layout and workshop design" (51.4%) , and the sixth part "the basic hygienic requirements for workplace" (51.4%) . In results of the key technical issues needed to be modified of GBZ 1-2010, the contents needed to be added as priories were the occupational prevention and control requirements of biological factors (51.4%) , technical parameters of dust in workplace (48.7%) , technical parameters of hazardous agents in workplace (46.9%) , the quality and quantity requirements of fresh air (46.0%) , the setting conditions of the emergency rescue station (46.0%) , the hygienic design requirements of joint workshops and the evidence (45.1%) , and requirements for medical emergency rescue personnel equipped and qualified (45.1%) . Conclusion: GBZ 1-2010 is feasible and practical, mainly used by occupational health technical service organizations in the occupational hazards evaluation for constructive project, lecturing/training, occupational hazards monitoring, et al. GBZ 1 plays a directive role in government decision-making, control of constructive projects from the beginning, training and capacity building of occupational health professionals, and the prevention and treatment of occupational diseases in enterprises, needing to strengthen the implementation of GBZ 1. And on the basis of the above key technical issues to be revised, international cooperation and exchanges should be strengthened, so that it is adapted to the development of the modern enterprise system.
32 CFR 203.17 - Technical assistance provider reporting requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 32 National Defense 2 2010-07-01 2010-07-01 false Technical assistance provider reporting requirements. 203.17 Section 203.17 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY... technical assistance provider shall submit progress reports, financial status reports, materials prepared...
32 CFR 203.17 - Technical assistance provider reporting requirements.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 32 National Defense 2 2014-07-01 2014-07-01 false Technical assistance provider reporting requirements. 203.17 Section 203.17 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY... technical assistance provider shall submit progress reports, financial status reports, materials prepared...
32 CFR 203.17 - Technical assistance provider reporting requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 32 National Defense 2 2013-07-01 2013-07-01 false Technical assistance provider reporting requirements. 203.17 Section 203.17 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY... technical assistance provider shall submit progress reports, financial status reports, materials prepared...
32 CFR 203.17 - Technical assistance provider reporting requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 32 National Defense 2 2011-07-01 2011-07-01 false Technical assistance provider reporting requirements. 203.17 Section 203.17 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY... technical assistance provider shall submit progress reports, financial status reports, materials prepared...
32 CFR 203.17 - Technical assistance provider reporting requirements.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 32 National Defense 2 2012-07-01 2012-07-01 false Technical assistance provider reporting requirements. 203.17 Section 203.17 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY... technical assistance provider shall submit progress reports, financial status reports, materials prepared...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-01
... Models for Plant-Specific Adoption of Technical Specifications Task Force Traveler TSTF-500, Revision 2... Specifications Task Force (TSTF) Traveler TSTF- 500, Revision 2, ``DC Electrical Rewrite--Update to TSTF-360....8.6, ``Battery Cell Parameters.'' Additionally, a new Administrative Controls program, titled...
North, Richard B; Kidd, David H; Olin, John; Sieracki, Jeffrey M; Farrokhi, Farrokh; Petrucci, Loredana; Cutchis, Protagoras N
2005-06-15
A prospective, controlled, clinical trial comparing single and dual percutaneous electrodes in the treatment of axial low back pain from failed back surgery syndrome. To clarify technical requirements and test the hypothesis that placing two linear arrays in parallel, thereby doubling the number of contacts, improves outcome. Technical improvements have enhanced outcomes of spinal cord stimulation for chronic axial low back pain. Dual, parallel electrodes reportedly improve these outcomes. Acting as their own controls, 20 patients who passed screening with single, 4-contact electrodes received permanent dual, 4-contact electrodes with 7- or 10-mm intercontact distances at the same vertebral level(s). We quantified and compared the technical and clinical results of the single and dual electrodes, adjusting stimulation parameters to specific psychophysical thresholds. Single electrodes provided significant (P < 0.01) advantages in patient- and computer-calculated ratings of pain coverage by paresthesias and in the scaled amplitude necessary to cover the low back, compared with dual 7-mm electrodes. Slight advantages without statistical significance were observed for the single over the dual 10-mm electrodes. Amplitude requirements were significantly lower for the single electrode than for either dual electrode. At long-term follow-up, 53% of patients met the criteria for clinical success. While we observed disadvantages for dual electrodes in treating axial low back pain, we achieved technical success with single or dual electrodes in most patients and maintained this success clinically with dual electrodes in 53%.
NASA Engineering Excellence: A Case Study on Strengthening an Engineering Organization
NASA Technical Reports Server (NTRS)
Shivers, C. Herbert; Wessel, Vernon W.
2006-01-01
NASA implemented a system of technical authority following the Columbia Accident Investigation Board (CAE) report calling for independent technical authority to be exercised on the Space Shuttle Program activities via a virtual organization of personnel exercising specific technical authority responsibilities. After the current NASA Administrator reported for duty, and following the first of two planned "Shuttle Return to Flight" missions, the NASA Chief Engineer and the Administrator redirected the Independent Technical Authority to a program of Technical Excellence and Technical Authority exercised within the existing engineering organizations. This paper discusses the original implementation of technical authority and the transition to the new implementation of technical excellence, including specific measures aimed at improving safety of future Shuttle and space exploration flights.
Environmental regulations: Technical reference manual TRM 016.01, September 15, 1995
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-09-15
This TRM is divided into two primary sections. The first section entitled Environmental Programs provides a synopsis of each environmental Act (Federal Law). The second section of the TRM is entitled Environmental Operations. This section is in effect the nuts and bolts of the regulatory compliance programs. In this section, the program manager can reference specific requirements which will aid in structuring the compliance program.
Military display performance parameters
NASA Astrophysics Data System (ADS)
Desjardins, Daniel D.; Meyer, Frederick
2012-06-01
The military display market is analyzed in terms of four of its segments: avionics, vetronics, dismounted soldier, and command and control. Requirements are summarized for a number of technology-driving parameters, to include luminance, night vision imaging system compatibility, gray levels, resolution, dimming range, viewing angle, video capability, altitude, temperature, shock and vibration, etc., for direct-view and virtual-view displays in cockpits and crew stations. Technical specifications are discussed for selected programs.
Aeronautical Systems Division (AFSC) Program Management Resource Document.
1981-09-30
assure that the detail desing adeuately satisfies the requirements contained in the Part I Development Specifications and to allow the PM to formally...disciplines. He becomes a source of integrated information concerning a particular program and an interaction point for coordinating the di- verse...consider cost, schedule, and technical factors not only individually, but also their interaction on each other (5 60). The fact that a program has
2002-02-01
NVLAP procedures are compatible with, among others, the most recent official publications of ISO / IEC 17025 (formally ISO / IEC Guide 25), ISO Guides 2, 30... IEC Guide 17025 and the relevant requirements of ISO 9002-1994. NVLAP Handbook 150-20 contains information that is specific to Common Criteria...Evaluation Technical Report EAP Evaluation Acceptance Package IEC International Electrotechnical Commission ISO International
NASA Technical Reports Server (NTRS)
Lockwood, Dennis W.; Conger, A. M.
2003-01-01
This document is a compendium of the WFF GFO Software Development Team's knowledge regarding of GDO CAL/VAL Data. It includes many elements of a requirements document, a software specification document, a software design document, and a user's guide. In the more technical sections, this document assumes the reader is familiar with GFO and its CAL/VAL Data.
Recommendations for portable supplemental meteorological instrumentation for incident response
DOE Office of Scientific and Technical Information (OSTI.GOV)
Brown, R.M.; Tichler, J.L.
The Nuclear Regulatory Commission (NRC) staff requested technical assistance in recommending portable supplementary meteorological instrumentation which can be deployed to nuclear power plant sites in response to incidents. A supplementary meteorological system (SMS), whose primary function is to collect, analyze and disseminate supplemental meteorological information, is recommended. Instrument specifications are discussed along with maintenance and staffing requirements. A cost evaluation of the components is made. 5 refs., 1 fig.
Using Transgenic Zebrafish to Study Muscle Stem/Progenitor Cells.
Nguyen, Phong D; Currie, Peter D
2017-01-01
Understanding muscle stem cell behaviors can potentially provide insights into how these cells act and respond during normal growth and diseased contexts. The zebrafish is an ideal model organism to examine these behaviors in vivo where it would normally be technically challenging in other mammalian models. This chapter will describe the procedures required to successfully conduct live imaging of zebrafish transgenics that has specifically been adapted for skeletal muscle.
Beilenhoff, Ulrike; Biering, Holger; Blum, Reinhard; Brljak, Jadranka; Cimbro, Monica; Dumonceau, Jean-Marc; Hassan, Cesare; Jung, Michael; Neumann, Christiane; Pietsch, Michael; Pineau, Lionel; Ponchon, Thierry; Rejchrt, Stanislav; Rey, Jean-François; Schmidt, Verona; Tillett, Jayne; van Hooft, Jeanin
2017-12-01
1 Prerequisites. The clinical service provider should obtain confirmation from the endoscope washer-disinfector (EWD) manufacturer that all endoscopes intended to be used can be reprocessed in the EWD. 2 Installation qualification. This can be performed by different parties but national guidelines should define who has the responsibilities, taking into account legal requirements. 3 Operational qualification. This should include parametric tests to verify that the EWD is working according to its specifications. 4 Performance qualification. Testing of cleaning performance, microbiological testing of routinely used endoscopes, and the quality of the final rinse water should be considered in all local guidelines. The extent of these tests depends on local requirements. According to the results of type testing performed during EWD development, other parameters can be tested if local regulatory authorities accept this. Chemical residues on endoscope surfaces should be searched for, if acceptable test methods are available. 5 Routine inspections. National guidelines should consider both technical and performance criteria. Individual risk analyses performed in the validation and requalification processes are helpful for defining appropriate test frequencies for routine inspections. © Georg Thieme Verlag KG Stuttgart · New York.
Billings, Jay Jay; Deyton, Jordan H.; Forest Hull, S.; ...
2015-07-17
Building new fission reactors in the United States presents many technical and regulatory challenges. Chief among the technical challenges is the need to share and present results from new high- fidelity, high- performance simulations in an easily consumable way. In light of the modern multi-scale, multi-physics simulations can generate petabytes of data, this will require the development of new techniques and methods to reduce the data to familiar quantities of interest with a more reasonable resolution and size. Furthermore, some of the results from these simulations may be new quantities for which visualization and analysis techniques are not immediately availablemore » in the community and need to be developed. Our paper describes a new system for managing high-performance simulation results in a domain-specific way that naturally exposes quantities of interest for light water and sodium-cooled fast reactors. It enables easy qualitative and quantitative comparisons between simulation results with a graphical user interface and cross-platform, multi-language input- output libraries for use by developers to work with the data. One example comparing results from two different simulation suites for a single assembly in a light-water reactor is presented along with a detailed discussion of the system s requirements and design.« less
Safety evaluation of cosmetics in the EU. Reality and challenges for the toxicologist.
Pauwels, Marleen; Rogiers, Vera
2004-06-15
Council Directive 76/768/EEC, its seven amendments and 30 adaptations to technical progress form the basis of the cosmetic EU legislation today. There are actually four key principles for safety in the cosmetic legislation. (i) The full responsibility for the safety of cosmetics for human health is placed on the manufacturer, first importer in the EU or marketer. (ii) The safety evaluation of finished products is based on safety of individual ingredients, more specifically on their chemical structure, toxicological profile and their level of exposure. (iii) A compilation of information on each cosmetic product (dossier) must be kept readily available for inspection by the competent authorities of the Member State concerned. This information source, usually called a technical information file (TIF) or product information file/requirements (PIF(R)), contains, as the most important part, the safety assessment of the product undersigned by a competent safety assessor. (iv) The use of validated replacement alternative methods instead of animal testing forms the 4th key principle for safety of cosmetic products on the EU market. The 7th amendment imposes strict deadlines for the abolition of animal in vivo studies on cosmetic ingredients. These legal requirements induce a number of important challenges for the cosmetic industry and more specifically for the toxicologist involved as safety assessor.
47 CFR 24.415 - Technical content of applications; maintenance of list of station locations.
Code of Federal Regulations, 2013 CFR
2013-10-01
... of list of station locations. 24.415 Section 24.415 Telecommunication FEDERAL COMMUNICATIONS... list of station locations. (a) All applications required by this part shall contain all technical... number of general technical requirements. (b) Each application (except applications for initial licenses...
47 CFR 24.415 - Technical content of applications; maintenance of list of station locations.
Code of Federal Regulations, 2012 CFR
2012-10-01
... of list of station locations. 24.415 Section 24.415 Telecommunication FEDERAL COMMUNICATIONS... list of station locations. (a) All applications required by this part shall contain all technical... number of general technical requirements. (b) Each application (except applications for initial licenses...
47 CFR 24.415 - Technical content of applications; maintenance of list of station locations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... of list of station locations. 24.415 Section 24.415 Telecommunication FEDERAL COMMUNICATIONS... list of station locations. (a) All applications required by this part shall contain all technical... number of general technical requirements. (b) Each application (except applications for initial licenses...
47 CFR 24.415 - Technical content of applications; maintenance of list of station locations.
Code of Federal Regulations, 2011 CFR
2011-10-01
... of list of station locations. 24.415 Section 24.415 Telecommunication FEDERAL COMMUNICATIONS... list of station locations. (a) All applications required by this part shall contain all technical... number of general technical requirements. (b) Each application (except applications for initial licenses...
47 CFR 24.415 - Technical content of applications; maintenance of list of station locations.
Code of Federal Regulations, 2014 CFR
2014-10-01
... of list of station locations. 24.415 Section 24.415 Telecommunication FEDERAL COMMUNICATIONS... list of station locations. (a) All applications required by this part shall contain all technical... number of general technical requirements. (b) Each application (except applications for initial licenses...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-04
... DEPARTMENT OF HEALTH AND HUMAN SERVICES Food and Drug Administration [Docket No. FDA-2012-D-0288] International Cooperation on Harmonisation of Technical Requirements for Registration of Veterinary Medicinal... been developed for veterinary use by the International Cooperation on Harmonisation of Technical...
NASA Astrophysics Data System (ADS)
Kravitz, David William
This paper presents an insider's view of the rationale and the cryptographic mechanics of some principal elements of the Open Mobile Alliance (OMA) Secure Content Exchange (SCE) Technical Specifications. A primary goal is to enable implementation of a configurable methodology that quarantines the effects that unknown-compromised entities have on still-compliant entities in the system, while allowing import from upstream protection systems and multi-client reuse of Rights Objects that grant access to plaintext content. This has to be done without breaking compatibility with the underlying legacy OMA DRM v2.0/v2.1 Technical Specifications. It is also required that legacy devices can take at least partial advantage of the new import functionality, and can request the creation of SCE-compatible Rights Objects and utilize Rights Objects created upon request of SCE-conformant devices. This must be done in a way that the roles played by newly defined entities unrecognizable by legacy devices remain hidden.
Large liquid rocket engine transient performance simulation system
NASA Technical Reports Server (NTRS)
Mason, J. R.; Southwick, R. D.
1989-01-01
Phase 1 of the Rocket Engine Transient Simulation (ROCETS) program consists of seven technical tasks: architecture; system requirements; component and submodel requirements; submodel implementation; component implementation; submodel testing and verification; and subsystem testing and verification. These tasks were completed. Phase 2 of ROCETS consists of two technical tasks: Technology Test Bed Engine (TTBE) model data generation; and system testing verification. During this period specific coding of the system processors was begun and the engineering representations of Phase 1 were expanded to produce a simple model of the TTBE. As the code was completed, some minor modifications to the system architecture centering on the global variable common, GLOBVAR, were necessary to increase processor efficiency. The engineering modules completed during Phase 2 are listed: INJTOO - main injector; MCHBOO - main chamber; NOZLOO - nozzle thrust calculations; PBRNOO - preburner; PIPE02 - compressible flow without inertia; PUMPOO - polytropic pump; ROTROO - rotor torque balance/speed derivative; and TURBOO - turbine. Detailed documentation of these modules is in the Appendix. In addition to the engineering modules, several submodules were also completed. These submodules include combustion properties, component performance characteristics (maps), and specific utilities. Specific coding was begun on the system configuration processor. All functions necessary for multiple module operation were completed but the SOLVER implementation is still under development. This system, the Verification Checkout Facility (VCF) allows interactive comparison of module results to store data as well as provides an intermediate checkout of the processor code. After validation using the VCF, the engineering modules and submodules were used to build a simple TTBE.
Digital control and data acquisition for high-value GTA welding
NASA Astrophysics Data System (ADS)
George, T. G.; Franco-Ferreira, E. A.
Electric power for the Cassini space probe will be provided by radioisotope thermoelectric generators (RTG's) thermally driven by General-Purpose Heat Source (GPHS) modules. Each GPHS module contains four, 150-g, pellets of Pu-238O2, and each of the four pellets is encapsulated within a thin-wall iridium-alloy shell. GTA girth welding of these capsules is performed at Los Alamos National Laboratory (LANL) on an automated, digitally-controlled welding system. Baseline design considerations for system automation and strategies employed to maximize process yield, improve process consistency, and generate required quality assurance information are discussed. Design of the automated girth welding system was driven by a number of factors which militated for precise parametric control and data acquisition. Foremost among these factors was the extraordinary value of the capsule components. In addition, DOE order 5700.6B, which took effect on 23 Sep. 1986, required that all operations adhere to strict levels of process quality assurance. A detailed technical specification for the GPHS welding system was developed on the basis of a joint LANL/Westinghouse Savannah River Company (WSRC) design effort. After a competitive bidding process, Jetline Engineering, Inc., of Irvine, California, was selected as the system manufacturer. During the period over which four identical welding systems were fabricated, very close liason was maintained between the LANL/WSRC technical representatives and the vendor. The level of rapport was outstanding, and the end result was the 1990 delivery of four systems that met or exceeded all specification requirements.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
The objectives of the closure assessment were to determine the extent of contaminated soil adjacent to the USTs requiring excavation, to provide documentation of soil and groundwater conditions following excavation, and to document closure activities in accordance with applicable VADEQ regulations. During closure activities, ASI provided technical support to the Base to ensure that the UST removal contractor (E K, Inc.) hereinafter referred to as the Contractor was in compliance with the technical requirements (as specified in the Plans and Specifications for Removal of Abandoned Underground Storage Tanks, Virginia Air National Guard, Richmond International Airport, Sandston, VA., dated July 1991more » and revised April 1992, and Addendum Numbers 1 through 7) of the contract. ASI was also responsible for collecting soil and/or groundwater closure samples from the excavations, and providing off-site fixed based laboratory analysis to verify clean conditions within the excavations.« less
Oberle, Michael; Wohlwend, Nadia; Jonas, Daniel; Maurer, Florian P; Jost, Geraldine; Tschudin-Sutter, Sarah; Vranckx, Katleen; Egli, Adrian
2016-01-01
The technical, biological, and inter-center reproducibility of matrix-assisted laser desorption ionization-time of flight mass spectrometry (MALDI TOF MS) typing data has not yet been explored. The aim of this study is to compare typing data from multiple centers employing bioinformatics using bacterial strains from two past outbreaks and non-related strains. Participants received twelve extended spectrum betalactamase-producing E. coli isolates and followed the same standard operating procedure (SOP) including a full-protein extraction protocol. All laboratories provided visually read spectra via flexAnalysis (Bruker, Germany). Raw data from each laboratory allowed calculating the technical and biological reproducibility between centers using BioNumerics (Applied Maths NV, Belgium). Technical and biological reproducibility ranged between 96.8-99.4% and 47.6-94.4%, respectively. The inter-center reproducibility showed a comparable clustering among identical isolates. Principal component analysis indicated a higher tendency to cluster within the same center. Therefore, we used a discriminant analysis, which completely separated the clusters. Next, we defined a reference center and performed a statistical analysis to identify specific peaks to identify the outbreak clusters. Finally, we used a classifier algorithm and a linear support vector machine on the determined peaks as classifier. A validation showed that within the set of the reference center, the identification of the cluster was 100% correct with a large contrast between the score with the correct cluster and the next best scoring cluster. Based on the sufficient technical and biological reproducibility of MALDI-TOF MS based spectra, detection of specific clusters is possible from spectra obtained from different centers. However, we believe that a shared SOP and a bioinformatics approach are required to make the analysis robust and reliable.
[Acoustic conditions in open plan office - Application of technical measures in a typical room].
Mikulski, Witold
2018-03-09
Noise in open plan offices should not exceed acceptable levels for the hearing protection. Its major negative effects on employees are nuisance and impediment in execution of work. Specific technical solutions should be introduced to provide proper acoustic conditions for work performance. Acoustic evaluation of a typical open plan office was presented in the article published in "Medycyna Pracy" 5/2016. None of the rooms meets all the criteria, therefore, in this article one of the rooms was chosen to apply different technical solutions to check the possibility of reaching proper acoustic conditions. Acoustic effectiveness of those solutions was verified by means of digital simulation. The model was checked by comparing the results of measurements and calculations before using simulation. The analyzis revealed that open plan offices supplemented with signals for masking speech signals can meet all the required criteria. It is relatively easy to reach proper reverberation time (i.e., sound absorption). It is more difficult to reach proper values of evaluation parameters determined from A-weighted sound pressure level (SPLA) of speech. The most difficult is to provide proper values of evaluation parameters determined from speech transmission index (STI). Finally, it is necessary (besides acoustic treatment) to use devices for speech masking. The study proved that it is technically possible to reach proper acoustic condition. Main causes of employees complaints in open plan office are inadequate acoustic work conditions. Therefore, it is necessary to apply specific technical solutions - not only sound absorbing suspended ceiling and high acoustic barriers, but also devices for speech masking. Med Pr 2018;69(2):153-165. This work is available in Open Access model and licensed under a CC BY-NC 3.0 PL license.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Shoemaker, Paul E.; Hardin, Ernest; Park, HeeHo Daniel
The subject report from High Bridge Associates (HBA) was issued on March 2, 2016, in reaction to a U.S. Department of Energy (DOE) program decision to pursue down-blending of surplus Pu and geologic disposal at the Waste Isolation Pilot Plant (WIPP). Sandia National Laboratories was requested by the DOE to review the technical arguments presented in the HBA report. Specifically, this review is organized around three technical topics: criticality safety, radiological release limits, and thermal impacts. Questions raised by the report pertaining to legal and regulatory requirements, safeguards and security, international agreements, and costing of alternatives, are beyond the scopemore » of this review.« less
Work management plan for data systems and analysis directorate
NASA Technical Reports Server (NTRS)
Nichols, L. R.
1979-01-01
A contract with the Data Systems and Analysis Directorate contains a specified level of resources related to a specific set of work in support of three divisions within the Data Systems and Analysis Directorate. The divisions are Institutional Data Systems Division, Ground Data Systems Division, and Mission Planning and Analysis Division. The Statement of work defines at a functional requirements level the type of support to be provided to the three divisions. The contract provides for further technical direction to the contractor through issuance of Job Orders. The Job order is the prime method of further defining the work to be done, allocating a portion of the total resources in the contract to the defined tasks, and further delegating technical responsibility.
NASA Technical Reports Server (NTRS)
Montoya, G.; Boldon, P.
1985-01-01
The Space Station Program is highly complex not only in its technological goals and requirements but also in its organizational structure. Eight Contractor teams supporting four NASA centers plus Headquarters must depend on effective exchange of information--the lifeblood of the program. The Technical and Management Information System (TMIS) is the means by which this exchange can take place. Value of the TMIS in increasing productivity comes primarily from its ability to make the right information available to whomever needs it when it is needed. Productivity of the aerospace professional and how it can be enhanced by the use of specifically recommended techniques and procedures for information management using the TMIS are discussed.
Far-Infrared Heterodyne Spectrometer for Sofia
NASA Technical Reports Server (NTRS)
Betz, A. L.
1998-01-01
The project goal was to evaluate the scientific capabilities and technical requirements for a far-infrared heterodyne spectrometer suitable for the SOFIA Airborne Observatory, which is now being developed by NASA under contract to the Universities Space Research Association (USRA). The conclusions detailed below include our specific recommendations for astronomical observations, as well as our intended technical approach for reaching these scientific goals. These conclusions were presented to USRA in the form of a proposal to build this instrument. USRA subsequently awarded the University of Colorado a 3-year grant to develop the proposed Hot-Electron micro-Bolometer (HEB) mixer concept for high frequencies above 3 THz, as well as other semiconductor mixer technologies suitable for high sensitivity receivers in the 2-6 THz frequency band.
Heat Melt Compactor Development Progress
NASA Technical Reports Server (NTRS)
Lee, Jeffrey M.; Fisher, John W.; Pace, Gregory
2017-01-01
The status of the Heat Melt Compactor (HMC) development project is reported. HMC Generation 2 (Gen 2) has been assembled and initial testing has begun. A baseline mission use case for trash volume reduction, water recovery, trash sterilization, and the venting of effluent gases and water vapor to space has been conceptualized. A test campaign to reduce technical risks is underway. This risk reduction testing examines the many varied operating scenarios and conditions needed for processing trash during a space mission. The test results along with performance characterization of HMC Gen 2 will be used to prescribe requirements and specifications for a future ISS flight Technology Demonstration. We report on the current status, technical risks, and test results in the context of an ISS vent-to-space Technology Demonstration.
The Future Cybersecurity Workforce: Going Beyond Technical Skills for Successful Cyber Performance
Dawson, Jessica; Thomson, Robert
2018-01-01
One of the challenges in writing an article reviewing the current state of cyber education and workforce development is that there is a paucity of quantitative assessment regarding the cognitive aptitudes, work roles, or team organization required by cybersecurity professionals to be successful. In this review, we argue that the people who operate within the cyber domain need a combination of technical skills, domain specific knowledge, and social intelligence to be successful. They, like the networks they operate, must also be reliable, trustworthy, and resilient. Defining the knowledge, skills, attributes, and other characteristics is not as simple as defining a group of technical skills that people can be trained on; the complexity of the cyber domain makes this a unique challenge. There has been little research devoted to exactly what attributes individuals in the cyber domain need. What research does exist places an emphasis on technical and engineering skills while discounting the important social and organizational influences that dictate success or failure in everyday settings. This paper reviews the literature on cyber expertise and cyber workforce development to identify gaps and then argues for the important contribution of social fit in the highly complex and heterogenous cyber workforce. We then identify six assumptions for the future of cybersecurity workforce development, including the requirement for systemic thinkers, team players, a love for continued learning, strong communication ability, a sense of civic duty, and a blend of technical and social skill. Finally, we make recommendations for social and cognitive metrics which may be indicative of future performance in cyber work roles to provide a roadmap for future scholars. PMID:29946276
Technical Support Document for Version 3.6.1 of the COMcheck Software
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bartlett, Rosemarie; Connell, Linda M.; Gowri, Krishnan
2009-09-29
This technical support document (TSD) is designed to explain the technical basis for the COMcheck software as originally developed based on the ANSI/ASHRAE/IES Standard 90.1-1989 (Standard 90.1-1989). Documentation for other national model codes and standards and specific state energy codes supported in COMcheck has been added to this report as appendices. These appendices are intended to provide technical documentation for features specific to the supported codes and for any changes made for state-specific codes that differ from the standard features that support compliance with the national model codes and standards.
INDOT Technical Training Plan : [Technical Summary
DOT National Transportation Integrated Search
2012-01-01
A wide range of job classifications, increasing technical : performance expectations, licensing and certification requirements, : budget restrictions and frequent department : reorganization has made technical training of employees : more difficult, ...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-16
... which initial and transition flight training must include an in-flight element. Technical Amendment This.... 28471; Amendment Nos. 121-355 and 135-125] RIN 2120-AF08 Training and Qualification Requirements for Check Airmen and Flight Instructors; Technical Amendment AGENCY: Federal Aviation Administration (FAA...
44 CFR 65.3 - Requirement to submit new technical data.
Code of Federal Regulations, 2010 CFR
2010-10-01
... technical data. 65.3 Section 65.3 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY... IDENTIFICATION AND MAPPING OF SPECIAL HAZARD AREAS § 65.3 Requirement to submit new technical data. A community's base flood elevations may increase or decrease resulting from physical changes affecting flooding...
22 CFR 125.6 - Certification requirements for exemptions.
Code of Federal Regulations, 2010 CFR
2010-04-01
... LICENSES FOR THE EXPORT OF TECHNICAL DATA AND CLASSIFIED DEFENSE ARTICLES § 125.6 Certification requirements for exemptions. (a) To claim an exemption for the export of technical data under the provisions of.... Certifications consist of clearly marking the package or letter containing the technical data “22 CFR [insert...
19 CFR 115.30 - Technical requirements for containers by design type.
Code of Federal Regulations, 2011 CFR
2011-04-01
... SECURITY; DEPARTMENT OF THE TREASURY CARGO CONTAINER AND ROAD VEHICLE CERTIFICATION PURSUANT TO INTERNATIONAL CUSTOMS CONVENTIONS Procedures for Approval of Containers by Design Type § 115.30 Technical... 19 Customs Duties 1 2011-04-01 2011-04-01 false Technical requirements for containers by design...
19 CFR 115.30 - Technical requirements for containers by design type.
Code of Federal Regulations, 2012 CFR
2012-04-01
... SECURITY; DEPARTMENT OF THE TREASURY CARGO CONTAINER AND ROAD VEHICLE CERTIFICATION PURSUANT TO INTERNATIONAL CUSTOMS CONVENTIONS Procedures for Approval of Containers by Design Type § 115.30 Technical... 19 Customs Duties 1 2012-04-01 2012-04-01 false Technical requirements for containers by design...
19 CFR 115.30 - Technical requirements for containers by design type.
Code of Federal Regulations, 2014 CFR
2014-04-01
... SECURITY; DEPARTMENT OF THE TREASURY CARGO CONTAINER AND ROAD VEHICLE CERTIFICATION PURSUANT TO INTERNATIONAL CUSTOMS CONVENTIONS Procedures for Approval of Containers by Design Type § 115.30 Technical... 19 Customs Duties 1 2014-04-01 2014-04-01 false Technical requirements for containers by design...
19 CFR 115.30 - Technical requirements for containers by design type.
Code of Federal Regulations, 2010 CFR
2010-04-01
... SECURITY; DEPARTMENT OF THE TREASURY CARGO CONTAINER AND ROAD VEHICLE CERTIFICATION PURSUANT TO INTERNATIONAL CUSTOMS CONVENTIONS Procedures for Approval of Containers by Design Type § 115.30 Technical... 19 Customs Duties 1 2010-04-01 2010-04-01 false Technical requirements for containers by design...
19 CFR 115.30 - Technical requirements for containers by design type.
Code of Federal Regulations, 2013 CFR
2013-04-01
... SECURITY; DEPARTMENT OF THE TREASURY CARGO CONTAINER AND ROAD VEHICLE CERTIFICATION PURSUANT TO INTERNATIONAL CUSTOMS CONVENTIONS Procedures for Approval of Containers by Design Type § 115.30 Technical... 19 Customs Duties 1 2013-04-01 2013-04-01 false Technical requirements for containers by design...
47 CFR 24.815 - Technical content of applications; maintenance of list of station locations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... of list of station locations. 24.815 Section 24.815 Telecommunication FEDERAL COMMUNICATIONS... list of station locations. (a) All applications required by this part shall contain all technical... describe a number of general technical requirements. (b) Each application (except applications for initial...
47 CFR 24.815 - Technical content of applications; maintenance of list of station locations.
Code of Federal Regulations, 2013 CFR
2013-10-01
... of list of station locations. 24.815 Section 24.815 Telecommunication FEDERAL COMMUNICATIONS... list of station locations. (a) All applications required by this part shall contain all technical... describe a number of general technical requirements. (b) Each application (except applications for initial...
47 CFR 24.815 - Technical content of applications; maintenance of list of station locations.
Code of Federal Regulations, 2014 CFR
2014-10-01
... of list of station locations. 24.815 Section 24.815 Telecommunication FEDERAL COMMUNICATIONS... list of station locations. (a) All applications required by this part shall contain all technical... describe a number of general technical requirements. (b) Each application (except applications for initial...
47 CFR 24.815 - Technical content of applications; maintenance of list of station locations.
Code of Federal Regulations, 2011 CFR
2011-10-01
... of list of station locations. 24.815 Section 24.815 Telecommunication FEDERAL COMMUNICATIONS... list of station locations. (a) All applications required by this part shall contain all technical... describe a number of general technical requirements. (b) Each application (except applications for initial...
22 CFR 125.6 - Certification requirements for exemptions.
Code of Federal Regulations, 2011 CFR
2011-04-01
.... Certifications consist of clearly marking the package or letter containing the technical data “22 CFR [insert... LICENSES FOR THE EXPORT OF TECHNICAL DATA AND CLASSIFIED DEFENSE ARTICLES § 125.6 Certification requirements for exemptions. (a) To claim an exemption for the export of technical data under the provisions of...
22 CFR 125.6 - Certification requirements for exemptions.
Code of Federal Regulations, 2013 CFR
2013-04-01
.... Certifications consist of clearly marking the package or letter containing the technical data “22 CFR [insert... LICENSES FOR THE EXPORT OF TECHNICAL DATA AND CLASSIFIED DEFENSE ARTICLES § 125.6 Certification requirements for exemptions. (a) To claim an exemption for the export of technical data under the provisions of...
22 CFR 125.6 - Certification requirements for exemptions.
Code of Federal Regulations, 2014 CFR
2014-04-01
.... Certifications consist of clearly marking the package or letter containing the technical data “22 CFR [insert... LICENSES FOR THE EXPORT OF TECHNICAL DATA AND CLASSIFIED DEFENSE ARTICLES § 125.6 Certification requirements for exemptions. (a) To claim an exemption for the export of technical data under the provisions of...
22 CFR 125.6 - Certification requirements for exemptions.
Code of Federal Regulations, 2012 CFR
2012-04-01
.... Certifications consist of clearly marking the package or letter containing the technical data “22 CFR [insert... LICENSES FOR THE EXPORT OF TECHNICAL DATA AND CLASSIFIED DEFENSE ARTICLES § 125.6 Certification requirements for exemptions. (a) To claim an exemption for the export of technical data under the provisions of...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-16
... Information Collection for Public Comment; McKinney-Vento Technical Assistance Narrative, Matrices, and... Narrative, Matrices, and Reporting Requirements. Description of the need for the information proposed: McKinney- Vento Technical Assistance (MV-TA) Narrative, Matrices, and Reporting Requirements will allow the...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-30
... Comment on the Proposed Models for Plant-Specific Adoption of Technical Specifications Task Force Traveler... on the proposed model safety evaluation (SE) for plant- specific adoption of Technical Specifications... System (ADAMS) under Accession Number ML103360003; the model application is available in ADAMS under...
Power System Trade Studies for the Lunar Surface Access Module
NASA Technical Reports Server (NTRS)
Kohout, Lisa, L.
2008-01-01
A Lunar Lander Preparatory Study (LLPS) was undertaken for NASA's Lunar Lander Pre-Project in 2006 to explore a wide breadth of conceptual lunar lander designs. Civil servant teams from nearly every NASA center responded with dozens of innovative designs that addressed one or more specific lander technical challenges. Although none of the conceptual lander designs sought to solve every technical design issue, each added significantly to the technical database available to the Lunar Lander Project Office as it began operations in 2007. As part of the LLPS, a first order analysis was performed to identify candidate power systems for the ascent and descent stages of the Lunar Surface Access Module (LSAM). A power profile by mission phase was established based on LSAM subsystem power requirements. Using this power profile, battery and fuel cell systems were modeled to determine overall mass and volume. Fuel cell systems were chosen for both the descent and ascent stages due to their low mass. While fuel cells looked promising based on these initial results, several areas have been identified for further investigation in subsequent studies, including the identification and incorporation of peak power requirements into the analysis, refinement of the fuel cell models to improve fidelity and incorporate ongoing technology developments, and broadening the study to include solar power.
Preparing clinical grade Ag-specific T cells for adoptive immunotherapy trials
DiGiusto, DL; Cooper, LJN
2007-01-01
The production of clinical-grade T cells for adoptive immunotherapy has evolved from the ex vivo numerical expansion of tumor-infiltrating lymphocytes to sophisticated bioengineering processes often requiring cell selection, genetic modification and other extensive tissue culture manipulations, to produce desired cells with improved therapeutic potential. Advancements in understanding the biology of lymphocyte signaling, activation, homing and sustained in vivo proliferative potential have redefined the strategies used to produce T cells suitable for clinical investigation. When combined with new technical methods in cell processing and culturing, the therapeutic potential of T cells manufactured in academic centers has improved dramatically. Paralleling these technical achievements in cell manufacturing is the development of broadly applied regulatory standards that define the requirements for the clinical implementation of cell products with ever-increasing complexity. In concert with academic facilities operating in compliance with current good manufacturing practice, the prescribing physician can now infuse T cells with a highly selected or endowed phenotype that has been uniformly manufactured according to standard operating procedures and that meets federal guidelines for quality of investigational cell products. In this review we address salient issues related to the technical, immunologic, practical and regulatory aspects of manufacturing these advanced T-cell products for clinical use. PMID:17943498
An update on technical and methodological aspects for cardiac PET applications.
Presotto, Luca; Busnardo, Elena; Gianolli, Luigi; Bettinardi, Valentino
2016-12-01
Positron emission tomography (PET) is indicated for a large number of cardiac diseases: perfusion and viability studies are commonly used to evaluate coronary artery disease; PET can also be used to assess sarcoidosis and endocarditis, as well as to investigate amyloidosis. Furthermore, a hot topic for research is plaque characterization. Most of these studies are technically very challenging. High count rates and short acquisition times characterize perfusion scans while very small targets have to be imaged in inflammation/infection and plaques examinations. Furthermore, cardiac PET suffers from respiratory and cardiac motion blur. Each type of studies has specific requirements from the technical and methodological point of view, thus PET systems with overall high performances are required. Furthermore, in the era of hybrid PET/computed tomography (CT) and PET/Magnetic Resonance Imaging (MRI) systems, the combination of complementary functional and anatomical information can be used to improve diagnosis and prognosis. Moreover, PET images can be qualitatively and quantitatively improved exploiting information from the other modality, using advanced algorithms. In this review we will report the latest technological and methodological innovations for PET cardiac applications, with particular reference to the state of the art of the hybrid PET/CT and PET/MRI. We will also report the most recent advancements in software, from reconstruction algorithms to image processing and analysis programs.
NASA Technical Reports Server (NTRS)
Bernstein, Karen S.; Kujala, Rod; Fogt, Vince; Romine, Paul
2011-01-01
This document establishes the structural requirements for human-rated spaceflight hardware including launch vehicles, spacecraft and payloads. These requirements are applicable to Government Furnished Equipment activities as well as all related contractor, subcontractor and commercial efforts. These requirements are not imposed on systems other than human-rated spacecraft, such as ground test articles, but may be tailored for use in specific cases where it is prudent to do so such as for personnel safety or when assets are at risk. The requirements in this document are focused on design rather than verification. Implementation of the requirements is expected to be described in a Structural Verification Plan (SVP), which should describe the verification of each structural item for the applicable requirements. The SVP may also document unique verifications that meet or exceed these requirements with NASA Technical Authority approval.
SeaWiFS Technical Report Series. Volume 22: Prelaunch Acceptance Report for the SeaWiFS Radiometer
NASA Technical Reports Server (NTRS)
Hooker, Stanford B. (Editor); Firestone, Elaine R. (Editor); Acker, James G. (Editor); Barnes, Robert A.; Barnes, William L.; Esaias, Wayne E.; Mcclain, Charles R.
1994-01-01
The final acceptance, or rejection, of the Sea-viewing Wide Field-of-view Sensor (SeaWiFS) will be determined by the instrument's on-orbit operation. There is, however, an extensive set of laboratory measurements describing the operating characteristics of the radiometer. Many of the requirements in the Ocean Color Data Mission (OCDM) specifications can be checked only by laboratory measurements. Here, the calibration review panel examines the laboratory characterization and calibration of SeaWiFS in the light of the OCDM performance specification. Overall, the performance of the SeaWiFS instrument meets or exceeds the requirements of the OCDM contract in all but a few unimportant details. The detailed results of this examination are presented here by following the outline of the specifications, as found in the Contract. The results are presented in the form of requirements and compliance pairs. These results give conclusions on many, but not all, of the performance specifications. The acceptance by this panel of the performance of SeaWiFS must only be considered as an intermediate conclusion. The ultimate acceptance (or rejection) of the SeaWiFS data set will rely on the measurements made by the instrument on orbit.
From Science To Design: Systems Engineering For The Lsst
NASA Astrophysics Data System (ADS)
Claver, Chuck F.; Axelrod, T.; Fouts, K.; Kantor, J.; Nordby, M.; Sebag, J.; LSST Collaboration
2009-01-01
The LSST is a universal-purpose survey telescope that will address scores of scientific missions. To assist the technical teams to convergence to a specific engineering design, the LSST Science Requirements Document (SRD) selects four stressing principle scientific missions: 1) Constraining Dark Matter and Dark Energy; 2) taking an Inventory of the Solar System; 3) Exploring the Transient Optical Sky; and 4) mapping the Milky Way. From these 4 missions the SRD specifies the needed requirements for single images and the full 10 year survey that enables a wide range of science beyond the 4 principle missions. Through optical design and analysis, operations simulation, and throughput modeling the systems engineering effort in the LSST has largely focused on taking the SRD specifications and deriving system functional requirements that define the system design. A Model Based Systems Engineering approach with SysML is used to manage the flow down of requirements from science to system function to sub-system. The rigor of requirements flow and management assists the LSST in keeping the overall scope, hence budget and schedule, under control.
Technical Excellence: A Requirement for Good Engineering
NASA Technical Reports Server (NTRS)
Gill, Paul S.; Vaughan, William W.
2008-01-01
Technical excellence is a requirement for good engineering. Technical excellence has many different ways of expressing itself within engineering. NASA has initiatives that address the enhancement of the Agency's technical excellence and thrust to maintain the associated high level of performance by the Agency on current programs/projects and as it moves into the Constellation Program and the return to the Moon with plans to visit Mars. This paper addresses some of the key initiatives associated with NASA's technical excellence thrust. Examples are provided to illustrate some results being achieved and plans to enhance these initiatives.
van den Oever, Martien; Molenveld, Karin
2017-07-25
Larger scale market introduction of new bio-based products requires a clear advantage regarding sustainability, as well as an adequate techno-economic positioning relative to fossil based products. In a previous paper [Broeren et al., 2016], LCA results per kg and per functionality equivalent of bio-based plastics were presented, together with economic considerations. The present paper discusses the mechanical and thermal properties of a range of commercially available bio-based plastics based on polylactic acid (PLA), cellulose esters, starch and polyamides, and the feasibility of replacing fossil-based counterparts based on performance. The evaluation is approached from an end user perspective. First, potentially suitable bio-based plastics are selected based on manufacturers' specifications in technical data sheets, then a first experimental evaluation is performed on injection moulded ISO specimens, and finally a further selection of plastics is tested on large 50×70cm panels. This technical feasibility study indicates that so far bio-based plastics do not completely match the properties of high performance materials like flame retardant V-0 PC/ABS blends used in electronic devices. The performance gap is being decreased by the development of stereocomplex PLA and hybrid PLA blends with polycarbonate, which offer clearly improved properties with respect to maximum usage temperature and toughness. In addition, several materials meet the V-0 flammability requirements needed in specific durable applications. On the other hand, improving these properties so far has negative consequences for the bio-based content. This study also shows that replacement of bulk polymers like PS is feasible using PLA compounds with a bio-based content as high as 85%. Copyright © 2016 Elsevier B.V. All rights reserved.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-27
... of Technical Specifications Task Force Traveler TSTF-510, Revision 2, ``Revision to Steam Generator..., Revision 2, ``Revision to Steam Generator [(SG)] Program Inspection Frequencies and Tube Sample Selection..., ``Steam Generator (SG) Program,'' Specification 5.6.7, ``Steam Generator Tube Inspection Report,'' and the...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-12
... revised the application of Risk- Managed Technical Specifications to Technical Specification 3.7.7, ``Control Room Makeup and Cleanup Filtration System.'' The purpose of the change was to correct a misapplication of the Configuration Risk Management Program that is currently allowed by the Technical...
Technical Submission Form: Technical Specification of a Wave Energy Farm.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Roberts, Jesse D.; Nielsen, Kim; Kennedy, Ben
The Wave - SPARC project developed the Technology Performance Level (TPL) assessment procedure based on a rigorous Systems Engineering exercise. The TPL assessment allows a whole system evaluation of Wave Energy Conversion Technology by measuring it against the requirements determined through the Systems Engineering exercise. The TPL assessment is intended to be useful in technology evaluation; in technology innovation; in allocation of public or priva te investment, and; in making equipment purchasing decisions. This Technical Submission Form (TSF) serves the purpose of collecting relevant and complete information, in a technology agnostic way, to allow TPL assessment s to be mademore » by third party assessor s. The intended usage of this document is that the organization or people that are performing the role of developers or promoters of a particular technology will use this form to provide the information necessary for the organization or people who are perf orming the assessor role to use the TPL assessment.« less
From H = log s(n) to conceptual framework: a short history of information.
Collins, Alan
2007-02-01
"Information" has become a widely used term in psychology, especially within cognitive psychology. However, despite its status as a technical term, the word now rarely receives explicit definition. By contrast, when information entered the vocabulary of psychologists in the late 1940s, it had an explicit mathematical definition largely derived from developments in information theory. This article examines how information entered psychology, how its meaning changed, and how it remained a technical term in the vocabulary of psychologists in the second part of the 20th century. "Information" became a term that was required to speak to ever more diverse theoretical concerns and its earliest definitions in psychology could not sustain such uses. As a consequence, "information" became a term whose technical uses became increasingly difficult to differentiate from its everyday meanings. I argue that this has not necessarily made "information" a worthless term but one whose lack of specificity may now be unsettling to some psychologists.
NASA Astrophysics Data System (ADS)
Knobbs, C. G.; Grayson, D. J.
2012-06-01
There is mounting evidence to show that engineers need more than technical skills to succeed in industry. This paper describes a curriculum innovation in which so-called 'soft' skills, specifically inter-personal and intra-personal skills, were integrated into a final year mining engineering course. The instructional approach was designed to promote independent learning and to develop non-technical skills, essential for students on the threshold of becoming practising engineers. Three psychometric tests were administered at the beginning of the course to make students aware of their own and their classmates' characteristics. Substantial prescribed reading assignments preceded weekly group discussions. Several projects during the course required team work skills and application of content knowledge to real-world contexts. Results obtained from students' reflection papers, assignments related to 'soft' skills and end of course evaluations suggest that students' appreciation of the need for these skills, as well as their own perceived competence, increased during the course. Their ability to function as independent learners also increased.
48 CFR 227.7102-2 - Rights in technical data.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Rights in technical data... Technical Data 227.7102-2 Rights in technical data. (a) The clause at 252.227-7015, Technical Data—Commercial Items, provides the Government specific license rights in technical data pertaining to commercial...