Sample records for technical support contractor

  1. 78 FR 30233 - Defense Federal Acquisition Regulation Supplement; Government Support Contractor Access to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-22

    ... Number 0750-AG38 Defense Federal Acquisition Regulation Supplement; Government Support Contractor Access... Government support contractors to have access to proprietary technical data belonging to prime contractors and other third parties, provided that the technical data owner may require the support contractor to...

  2. 76 FR 68429 - 36(b)(1) Arms Sales Notification

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-04

    ... documentation, U.S. Government and contractor engineering, technical, and logistics personnel support services, and other related elements of logistics support. (iv) Military Department: Navy (USMC) (SDH). (v.... Government and contractor engineering, technical, and logistics personnel [[Page 68432

  3. 77 FR 52698 - 36(b)(1) Arms Sales Notification

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-30

    ... training equipment, publications and technical data, U.S. Government and contractor technical and logistics personnel services and other related elements of program and logistics support. (iv) Military Department..., publications and technical data, U.S. Government and contractor technical and logistics personnel services and...

  4. 78 FR 36538 - 36(b)(1) Arms Sales Notification

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-18

    ... training equipment, U.S. Government and contractor engineering, technical and logistics support services... equipment, U.S. Government and contractor engineering, technical and logistics support services, and other... central government and the country's outlying areas. The sale of these C-130Js to Libya will significantly...

  5. 48 CFR 252.227-7015 - Technical data-Commercial items.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... support contractor means a contractor under a contract, the primary purpose of which is to furnish...) Form, fit, and function data means technical data that describes the required overall physical... another party; (ii) Are form, fit, and function data; (iii) Are a correction or change to technical data...

  6. 48 CFR 252.227-7015 - Technical data-Commercial items.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... support contractor means a contractor under a contract, the primary purpose of which is to furnish...) Form, fit, and function data means technical data that describes the required overall physical... another party; (ii) Are form, fit, and function data; (iii) Are a correction or change to technical data...

  7. 48 CFR 252.227-7015 - Technical data-Commercial items.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... support contractor means a contractor under a contract, the primary purpose of which is to furnish...) Form, fit, and function data means technical data that describes the required overall physical... another party; (ii) Are form, fit, and function data; (iii) Are a correction or change to technical data...

  8. 48 CFR 252.204-7015 - Disclosure of Information to Litigation Support Contractors.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Information to Litigation Support Contractors (FEB 2014) (a) Definitions. As used in this clause: Litigation..., financial, proprietary, or privileged nature. The term includes technical data and computer software, but...

  9. 23 CFR 230.204 - Implementation of supportive services.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... majority and minority contractors, contractors' associations, minority groups, and other persons or..., such as technical assistance, managerial assistance, counseling, certification assistance, and follow...

  10. 77 FR 32129 - Notice of Proposed Information Collection; Comment Request: Multifamily Contractor's/Mortgagor's...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-31

    ... Information Collection; Comment Request: Multifamily Contractor's/Mortgagor's Cost Breakdowns and..., Technical Support, Office of Multifamily Housing Development, Department of Housing and Urban Development... also lists the following information: Title of Proposal: Multifamily Contractor's/Mortgagor's Cost...

  11. 76 FR 40707 - 36(b)(1) Arms Sales Notification

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-11

    ... training and training equipment, support equipment, U.S. Government and contractor engineering, logistics... training equipment, support equipment, U.S. Government and contractor engineering, logistics, and technical... access to SSEE Increment F services via standard Service Oriented Architecture (SOA) interfaces via...

  12. 77 FR 40026 - 36(b)(1) Arms Sales Notification

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-06

    ... and contractor logistics, Quality Assurance Team support services, engineering and technical support..., engineering and technical support, and other related elements of program support. The estimated cost is $49..., maintenance, or training is Confidential. Reverse engineering could reveal Confidential information...

  13. Configuration Management Plan for the Tank Farm Contractor

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    WEIR, W.R.

    The Configuration Management Plan for the Tank Farm Contractor describes configuration management the contractor uses to manage and integrate its technical baseline with the programmatic and functional operations to perform work. The Configuration Management Plan for the Tank Farm Contractor supports the management of the project baseline by providing the mechanisms to identify, document, and control the technical characteristics of the products, processes, and structures, systems, and components (SSC). This plan is one of the tools used to identify and provide controls for the technical baseline of the Tank Farm Contractor (TFC). The configuration management plan is listed in themore » management process documents for TFC as depicted in Attachment 1, TFC Document Structure. The configuration management plan is an integrated approach for control of technical, schedule, cost, and administrative processes necessary to manage the mission of the TFC. Configuration management encompasses the five functional elements of: (1) configuration management administration, (2) configuration identification, (3) configuration status accounting, (4) change control, and (5 ) configuration management assessments.« less

  14. 78 FR 33994 - Defense Federal Acquisition Regulation Supplement; Government Support Contractor Access to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-06

    ... DEPARTMENT OF DEFENSE Defense Acquisition Regulations System 48 CFR Part 252 RIN Number 0750-AG38 Defense Federal Acquisition Regulation Supplement; Government Support Contractor Access to Technical Data (DFARS 2009-D031); Correction AGENCY: Defense Acquisition Regulations System, Department of Defense (DoD...

  15. 78 FR 78939 - 36(b)(1) Arms Sales Notification

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-27

    ... Quantity or Quantities of Articles or Services under Consideration for Purchase: C-130J technical, engineering and software support; software updates and patches; familiarization training for Portable Flight... and contractor technical support services; and other related elements of logistics and program support...

  16. Contractor Sales Training: Providing the Skills Necessary to Sell Comprehensive Home Energy Upgrades

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Billingsley, Megan; Stuart, Elizabeth

    2011-08-17

    Many comprehensive home energy efficiency programs rely on contractors as the customer-facing ‘front line’ to sell energy improvements. Adding sales skills to contractors’ existing technical expertise is key to converting more assessments into comprehensive home energy upgrades. Leading programs recognize the need to support contractors with sales and business training to help them succeed and to support the growth of the home performance industry for the long term. A number of contractor sales training efforts are emerging, including some programs that are seeing encouraging early results.

  17. Unions, Contractors and CTE

    ERIC Educational Resources Information Center

    Jarosz, Francesca

    2006-01-01

    Across Illinois, in places where unions thrive, construction industry professionals and career and technical education (CTE) teachers are working together in promoting work-based learning program to students. Likewise, the outreach program provides union-supported contractors with qualified candidates for future employment. Programs such as the…

  18. The contractor`s role in low-level waste disposal facility application review and licensing

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Serie, P.J.; Dressen, A.L.

    1991-12-31

    The California Department of Health Services will soon reach a licensing decision on the proposed Ward Valley low-level radioactive waste disposal facility. As the first regulatory agency in the country to address the 10 CFR Part 61 requirements for a new disposal facility, California`s program has broken new ground in its approach. Throughout the review process, the Department has relied on contractor support to augment its technical and administrative staff. A team consisting of Roy F. Weston, Inc., supported by ERM-Program Management Corp., Environmental Issues Management, Inc., and Rogers and Associates Engineering Corporation, has worked closely with the Department inmore » a staff extension role. The authors have been involved with the project in contractor project management roles since 1987, and continue to support the Department`s program as it proceeds to finalize its licensing process. This paper describes the selection process used to identify a contractor team with the needed skills and experience, and the makeup of team capabilities. It outlines the management, communication, and technical approaches used to assure a smooth agency-contractor function and relationship. It describes the techniques used to ensure that decisions and documents represented the Department credibly in its role as the regulatory and licensing agency under the Nuclear Regulatory Commission (NRC) Agreement State program. The paper outlines the license application review process and activities, through preparation of licensing documentation and responses to public comments. Lessons learned in coordination of an agency-contractor team effort to review and license a low-level waste disposal facility are reviewed and suggestions made for approaching a similar license application review and licensing situation.« less

  19. The role of NASA for aerospace information

    NASA Technical Reports Server (NTRS)

    Chandler, G. P., Jr.

    1980-01-01

    The NASA Scientific and Technical Information Program operations are performed by two contractor operated facilities. The NASA STI Facility, located near Baltimore, Maryland, employs about 210 people who process report literature, operate the computer complex, and provide support for software maintenance and developments. A second contractor, the Technical Information Services of the American Institute of Aeronautics and Astronautics, employs approximately 80 people in New York City and processes the open literature such as journals, magazines, and books. Features of these programs include online access via RECON, announcement services, and international document exchange.

  20. 76 FR 11363 - Defense Federal Acquisition Regulation Supplement; Government Support Contractor Access to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-02

    ... management and oversight of a program or effort (rather than to directly furnish an end item or service to... prime contractor or any such first-tier subcontractor in furnishing end items or services of the type.... 2320, which applies to technical data, but not to computer software (which is expressly excluded from...

  1. Management assessment of tank waste remediation system contractor readiness to proceed with phase 1B privatization

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Certa, P.J.

    1998-01-07

    Readiness to Proceed With Phase 1B Privatization documents the processes used to determine readiness to proceed with tank waste treatment technologies from private industry, now known as TWRS privatization. An overall systems approach was applied to develop action plans to support the retrieval and disposal mission of the TWRS Project. The systems and infrastructure required to support the mission are known. Required systems are either in place or plans have been developed to ensure they exist when needed. Since October 1996 a robust system engineering approach to establishing integrated Technical Baselines, work breakdown structures, tank farms organizational structure and configurations,more » work scope, and costs has become part of the culture within the TWRS Project. An analysis of the programmatic, management, and technical activities necessary to declare readiness to proceed with execution of the mission demonstrates that the system, personnel, and hardware will be on line and ready to support the private contractors. The systems approach included defining the retrieval and disposal mission requirements and evaluating the readiness of the Project Hanford Management Contract (PHMC) team to support initiation of waste processing by the private contractors in June 2002 and to receive immobilized waste shortly thereafter. The Phase 1 feed delivery requirements from the private contractor Requests for Proposal were reviewed. Transfer piping routes were mapped, existing systems were evaluated, and upgrade requirements were defined.« less

  2. Implementation of quality improvement techniques for management and technical processes in the ACRV project

    NASA Technical Reports Server (NTRS)

    Raiman, Laura B.

    1992-01-01

    Total Quality Management (TQM) is a cooperative form of doing business that relies on the talents of everyone in an organization to continually improve quality and productivity, using teams and an assortment of statistical and measurement tools. The objective of the activities described in this paper was to implement effective improvement tools and techniques in order to build work processes which support good management and technical decisions and actions which are crucial to the success of the ACRV project. The objectives were met by applications in both the technical and management areas. The management applications involved initiating focused continuous improvement projects with widespread team membership. The technical applications involved applying proven statistical tools and techniques to the technical issues associated with the ACRV Project. Specific activities related to the objective included working with a support contractor team to improve support processes, examining processes involved in international activities, a series of tutorials presented to the New Initiatives Office and support contractors, a briefing to NIO managers, and work with the NIO Q+ Team. On the technical side, work included analyzing data from the large-scale W.A.T.E.R. test, landing mode trade analyses, and targeting probability calculations. The results of these efforts will help to develop a disciplined, ongoing process for producing fundamental decisions and actions that shape and guide the ACRV organization .

  3. Implementation of quality improvement techniques for management and technical processes in the ACRV project

    NASA Astrophysics Data System (ADS)

    Raiman, Laura B.

    1992-12-01

    Total Quality Management (TQM) is a cooperative form of doing business that relies on the talents of everyone in an organization to continually improve quality and productivity, using teams and an assortment of statistical and measurement tools. The objective of the activities described in this paper was to implement effective improvement tools and techniques in order to build work processes which support good management and technical decisions and actions which are crucial to the success of the ACRV project. The objectives were met by applications in both the technical and management areas. The management applications involved initiating focused continuous improvement projects with widespread team membership. The technical applications involved applying proven statistical tools and techniques to the technical issues associated with the ACRV Project. Specific activities related to the objective included working with a support contractor team to improve support processes, examining processes involved in international activities, a series of tutorials presented to the New Initiatives Office and support contractors, a briefing to NIO managers, and work with the NIO Q+ Team. On the technical side, work included analyzing data from the large-scale W.A.T.E.R. test, landing mode trade analyses, and targeting probability calculations. The results of these efforts will help to develop a disciplined, ongoing process for producing fundamental decisions and actions that shape and guide the ACRV organization .

  4. 48 CFR 245.7002 - Duties and responsibilities of plant clearance officers.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... clearance cases and disposal documents; (e) Initiate screening and provide technical support to screeners in...) Technical and quantitative allocability of property; (g) Ensure the timely shipment or release by the... are minimized and, when necessary, work with the contractor and property administrator to implement...

  5. 78 FR 59342 - 36(b)(1) Arms Sales Notification

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-26

    ... related elements of logistical and program support. (iv) Military Department: Air Force (QAI) (v) Prior... contractor engineering, technical and logistics support services, and other related elements of logistical and program support. The estimated cost is $60 million. This proposed sale will contribute to the...

  6. 48 CFR 252.204-7014 - Limitations on the Use or Disclosure of Information by Litigation Support Contractors.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    .... Computer software does not include computer data bases or computer software documentation. Litigation... includes technical data and computer software, but does not include information that is lawfully, publicly available without restriction. Technical data means recorded information, regardless of the form or method...

  7. 48 CFR 227.7108 - Contractor data repositories.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Technical Data 227.7108 Contractor data repositories. (a) Contractor data repositories may be established... procedures for protecting technical data delivered to or stored at the repository from unauthorized release... disclosure of technical data from the repository to third parties consistent with the Government's rights in...

  8. 77 FR 53180 - 36(b)(1) Arms Sales Notification

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-31

    ... logistical and program support. (iv) Military Department: Air Force (CCZ, Amd 7). (v) Prior Related Cases, if.... Government and contractor technical and logistics support services; and other related elements of logistical and program support. The estimated cost is $850 million. This proposed sale will contribute to the...

  9. DOE standard: The Department of Energy Laboratory Accreditation Program for radiobioassay

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-12-01

    This technical standard describes the US Department of Energy Laboratory Accreditation Program (DOELAP) for Radiobioassay, for use by the US Department of Energy (DOE) and DOE Contractor radiobioassay programs. This standard is intended to be used in conjunction with the general administrative technical standard that describes the overall DOELAP accreditation process--DOE-STD-1111-98, Department of Energy Laboratory Accreditation Program Administration. This technical standard pertains to radiobioassay service laboratories that provide either direct or indirect (in vivo or in vitro) radiobioassay measurements in support of internal dosimetry programs at DOE facilities or for DOE and DOE contractors. Similar technical standards have been developedmore » for other DOELAP dosimetry programs. This program consists of providing an accreditation to DOE radiobioassay programs based on successful completion of a performance-testing process and an on-site evaluation by technical experts. This standard describes the technical requirements and processes specific to the DOELAP Radiobioassay Accreditation Program as required by 10 CFR 835 and as specified generically in DOE-STD-1111-98.« less

  10. 48 CFR 227.7103-11 - Contractor procedures and records.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Rights in Technical Data 227.7103-11 Contractor procedures and records. (a) The clause at 252.227-7013, Rights in Technical Data—Noncommercial Items, requires a contractor, and its subcontractors or suppliers that will deliver technical data with other than unlimited rights, to establish and follow written...

  11. Optical Data Processing.

    DTIC Science & Technology

    1985-10-01

    importance of this topic and the growing number of OPR papers in these references signifies the importance of this topic..’-’ In this present review...Research (grant 79-0091), and inde- random numbers is used at each TB. To simulate de- pendent contractors of Unicorn Systems Incorporated tector noise...ACKNOWLEDGMENTS. The support of Unicorn Systems Inc. contractors and various CMU grants from AFOSR and NASA Lewis are gratefully acknowledged as is the technical

  12. Locations Accessible | FNLCR Staging

    Cancer.gov

    The Frederick National Laboratory for Cancer Research campus is located 50 miles northwest of Washington, D.C., and 50 miles west of Baltimore, Maryland, in Frederick, Maryland.Operations and Technical Support contractor Leidos Biomedical Resea

  13. Locations Accessible | Frederick National Laboratory for Cancer Research

    Cancer.gov

    The Frederick National Laboratory for Cancer Research campus is located 50 miles northwest of Washington, D.C., and 50 miles west of Baltimore, Maryland, in Frederick, Maryland.Operations and Technical Support contractor Leidos Biomedical Resea

  14. 48 CFR 253.209-1 - Responsible prospective contractors.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Section III, Block 19, generally mean— (A) Technical capability. An assessment of the prospective contractor's key management personnel to determine if they have the basic technical knowledge, experience... completion. This includes— (1) An assessment of the prospective contractor's possession of, or the ability to...

  15. 48 CFR 1052.201-70 - Contracting Officer's Technical Representative (COTR) Designation and Authority.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... in writing. The term “technical direction” includes, without limitation, direction to the contractor... the actions of the contractor's employees. (d) Technical direction may be oral or in writing. The COTR... Technical Representative (COTR) Designation and Authority. 1052.201-70 Section 1052.201-70 Federal...

  16. GPHS-RTGs in support of the Cassini mission

    NASA Astrophysics Data System (ADS)

    1992-04-01

    The technical progress achieved during the period 30 Mar. - 27 Sep. 1992 is described. Topics covered include: spacecraft integration and liaison; engineering support; safety; qualified unicouple production, ETG fabrication, assembly, and test; ground support equipment; radioisotope thermoelectric generators (RTG) shipping and launch support; designs, reviews, and mission applications; project management, quality assurance, reliability, contract changes, non-capital contractor acquired government owned (CAGO) acquisitions, and CAGO maintenance; and CAGO acquisitions.

  17. 48 CFR 227.7103-10 - Contractor identification and marking of technical data to be furnished with restrictive markings.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... and marking of technical data to be furnished with restrictive markings. 227.7103-10 Section 227.7103... DEFENSE GENERAL CONTRACTING REQUIREMENTS PATENTS, DATA, AND COPYRIGHTS Rights in Technical Data 227.7103-10 Contractor identification and marking of technical data to be furnished with restrictive markings...

  18. 40 CFR 35.4195 - Are there certain people my group cannot select to be our technical advisor, grant administrator...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... cannot select to be our technical advisor, grant administrator, or other contractor under the grant? 35... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Technical Assistance Procuring A Technical Advisor Or Other Contractor with Tag Funds § 35.4195 Are there certain people my group cannot select to be our technical...

  19. Technical Support Document: Development of the Advanced Energy Design Guide for Grocery Stores--50% Energy Savings

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hale, E. T.; Macumber, D. L.; Long, N. L.

    2008-09-01

    This report provides recommendations that architects, designers, contractors, developers, owners, and lessees of grocery store buildings can use to achieve whole-building energy savings of at least 50% over ASHRAE Standard 90.1-2004.

  20. 40 CFR 35.4215 - What if my group can't find an adequate number of potential sources for a technical advisor or...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... number of potential sources for a technical advisor or other contractor? 35.4215 Section 35.4215... ASSISTANCE Grants for Technical Assistance Procuring A Technical Advisor Or Other Contractor with Tag Funds § 35.4215 What if my group can't find an adequate number of potential sources for a technical advisor...

  1. 40 CFR 35.4205 - How does my group procure a technical advisor or any other contractor?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false How does my group procure a technical... PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Technical Assistance Procuring A Technical Advisor Or Other Contractor with Tag Funds § 35.4205 How does my group...

  2. Management assessment of tank waste remediation system contractor readiness to proceed with phase 1B privatization

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Honeyman, J.O.

    1998-01-09

    This Management Assessment of Tank Waste Remediation System (TWRS) Contractor Readiness to Proceed With Phase 1B Privatization documents the processes used to determine readiness to proceed with tank waste treatment technologies from private industry, now known as TWRS privatization. An overall systems approach was applied to develop action plans to support the retrieval and disposal mission of the TWRS Project. The systems and infrastructure required to support the mission are known. Required systems are either in place or plans have been developed to ensure they exist when needed. Since October 1996 a robust system engineering approach to establishing integrated Technicalmore » Baselines, work breakdown structures, tank farms organizational structure and configurations, work scope, and costs has become part of the culture within the TWRS Project. An analysis of the programmatic, management, and technical activities necessary to declare readiness to proceed with execution of the mission demonstrates that the system, personnel, and hardware will be on-line and ready to support the private contractors. The systems approach included defining the retrieval and disposal mission requirements and evaluating the readiness of the Project Hanford Management Contract (PHMC) team to support initiation of waste processing by the private contractors in June 2002 and to receive immobilized waste shortly thereafter. The Phase 1 feed delivery requirements from the private contractor Requests for Proposal were reviewed. Transfer piping routes were mapped, existing systems were evaluated, and upgrade requirements were defined.« less

  3. 48 CFR 742.1170-4 - Progress reporting requirements and contract clause.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... progress. (b) Because the cognizant technical officer is the individual most familiar with the contractor's performance, the contractor must submit the progress reports directly to the cognizant technical officer. The cognizant technical officer must review the reports and advise the contracting officer, in writing, of any...

  4. 28 CFR 34.110 - Management of peer reviews.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 28 Judicial Administration 1 2010-07-01 2010-07-01 false Management of peer reviews. 34.110 Section 34.110 Judicial Administration DEPARTMENT OF JUSTICE OJJDP COMPETITION AND PEER REVIEW PROCEDURES Peer Review § 34.110 Management of peer reviews. A technical support contractor may assist in managing...

  5. 77 FR 13564 - 36(b)(1) Arms Sales Notification

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-07

    .... Government and contractor technical assistance and other related logistics support. \\*\\ as defined in Section... the ability to integrate the Helmet Mounted Cueing System. The software algorithms are the most sensitive portion of the AIM-9X-2 missile. The software continues to be modified via a pre- planned product...

  6. Organizational Considerations for Implementing Systems Engineering and Integration in the Ares Projects Office

    NASA Technical Reports Server (NTRS)

    Thomas, LeAnn; Doreswamy, Rajiv N.

    2008-01-01

    Systems Engineering and Integration (SE&I) is a critical discipline in developing new space systems. In 2005, NASA performed an internal study of 24 agency and Department of Defense (DoD) programs to evaluate methods of integrating SE&I practices and determine their effectiveness. The goal of the study was to determine the best SE&I implementation strategy for the Ares Projects Office. The study identified six SE&I organizational structures: 1. Lead systems integrator (LSI) with SE&I responsibility and government technical insight. 2a. Integration contractor with government SE&I responsibility (government insight). 2b. Integration contractor with government SE&I responsibility (government oversight). 3a. Prime contractor with SE&I responsibility (government insight). 3b. Prime contractor with SE&I responsibility (government oversight). 3c. Prime contractor with SE&I responsibility (government/industry partnership). 4a.Prime contractor with government SE&I responsibility (government insight). 4b. Prime contractor with government SE&I responsibility (government oversight). 4d.Prime contractors with total system performance responsibility (TSPR). 5. Prime contractor with government SE&I responsibility and integration products through a Federally Funded Research and Development Center (FFRDC). 6. Government/FFRDC in-house development with SE&I responsibility and function. The organizational structure used most often was number 4, using a prime contractor with government SE&I responsibility and government technical insight. However, data analyses did not establish a positive relationship between program development costs and specific SE&I organizational types, nor did it positively determine the relationship between successful programs or projects and their SE&I structure. The SE&I study reached the following conclusions: (1) Large, long-duration, technically complex programs or projects reach their technical goals, but rarely meet schedule or cost goals. NASA's recent successes have been smaller, short-duration development projects using heritage hardware/software, focused technology development, technical oversight and stable external factors. (2) Programs and projects have failed or been terminated due to lack of technical insight, relaxing of SE&I processes, and unstable external factors. (3) The study did not find a single, clear optimum SE&I organization type to fit all projects. However, while any organizational structure can be made to work, the fewer complexities in the program, the better the likelihood of success. (4) The most common successful SE&I organization structure type in the study was type 4b, where the government maintained integration responsibility, with the prime contractor providing SE&I products and the government providing technical oversight. This study was instrumental in helping the APO select organization structure 4, following the same SE&I and oversight process used during humanlund7s last voyages to the Moon.

  7. Expanded Guidance for NASA Systems Engineering. Volume 2: Crosscutting Topics, Special Topics, and Appendices

    NASA Technical Reports Server (NTRS)

    Hirshorn, Steven R.

    2017-01-01

    Historically, most successful NASA projects have depended on effectively blending project management, systems engineering, and technical expertise among NASA, contractors, and third parties. Underlying these successes are a variety of agreements (e.g., contract, memorandum of understanding, grant, cooperative agreement) between NASA organizations or between NASA and other Government agencies, Government organizations, companies, universities, research laboratories, and so on. To simplify the discussions, the term "contract" is used to encompass these agreements. This section focuses on the NASA systems engineering activities pertinent to awarding a contract, managing contract performance, and completing a contract. In particular, NASA systems engineering interfaces to the procurement process are covered, since the NASA engineering technical team plays a key role in the development and evaluation of contract documentation. Contractors and third parties perform activities that supplement (or substitute for) the NASA project technical team accomplishment of the NASA common systems engineering technical process activities and requirements outlined in this guide. Since contractors might be involved in any part of the systems engineering life cycle, the NASA project technical team needs to know how to prepare for, allocate or perform, and implement surveillance of technical activities that are allocated to contractors.

  8. Networks Technology Conference

    NASA Technical Reports Server (NTRS)

    Tasaki, Keiji K. (Editor)

    1993-01-01

    The papers included in these proceedings represent the most interesting and current topics being pursued by personnel at GSFC's Networks Division and supporting contractors involved in Space, Ground, and Deep Space Network (DSN) technical work. Although 29 papers are represented in the proceedings, only 12 were presented at the conference because of space and time limitations. The proceedings are organized according to five principal technical areas of interest to the Networks Division: Project Management; Network Operations; Network Control, Scheduling, and Monitoring; Modeling and Simulation; and Telecommunications Engineering.

  9. Analysis of Security Contractors in Deployed Environments

    DTIC Science & Technology

    2006-12-01

    35 2. Proper Training and Education .......................................................36 3. Improve Overall Contract Visibility...like to acknowledge the work of P. W. Singer , author of the book titled “Corporate Warriors,” whose dedicated research and thorough analysis on the...skills, including combat operations, strategic planning, intelligence, risk assessment, operational support, training , and technical skills.”3 CPFF

  10. 40 CFR 35.4195 - Are there certain people my group cannot select to be our technical advisor, grant administrator...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Are there certain people my group cannot select to be our technical advisor, grant administrator, or other contractor under the grant? 35... Contractor with Tag Funds § 35.4195 Are there certain people my group cannot select to be our technical...

  11. 40 CFR 35.4195 - Are there certain people my group cannot select to be our technical advisor, grant administrator...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Are there certain people my group cannot select to be our technical advisor, grant administrator, or other contractor under the grant? 35... Contractor with Tag Funds § 35.4195 Are there certain people my group cannot select to be our technical...

  12. 40 CFR 35.4195 - Are there certain people my group cannot select to be our technical advisor, grant administrator...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Are there certain people my group cannot select to be our technical advisor, grant administrator, or other contractor under the grant? 35... Contractor with Tag Funds § 35.4195 Are there certain people my group cannot select to be our technical...

  13. 40 CFR 35.4195 - Are there certain people my group cannot select to be our technical advisor, grant administrator...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Are there certain people my group cannot select to be our technical advisor, grant administrator, or other contractor under the grant? 35... Contractor with Tag Funds § 35.4195 Are there certain people my group cannot select to be our technical...

  14. Nevada Applied Ecology Information Center: a review of technical information support provided to the Nevada Applied Ecology Group

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fore, C.S.; Pfuderer, H.A.

    The Nevada Applied Ecology Information Center (NAEIC) was established in January 1972 to serve the needs of the Nevada Applied Ecology Group (NAEG) by identifying, collecting, analyzing, and disseminating technical information relevant to NAEG programs. Since its inception, the NAEIC has been active in providing specialized information support to NAEG staff in the following research areas: (1) environmental aspects of the transuranics; (2) historic literature (pre-1962) on plutonium and uranium; (3) cleanup and treatment of radioactively contaminated land; (4) bioenvironmental aspects of europium and rhodium; (5) NAEG contractor reports; and (6) uptake of radioactivity by food crops.

  15. 43 CFR 404.23 - How will Reclamation determine whether you or your contractor is qualified to conduct an...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... or your contractor is qualified to conduct an appraisal investigation or a feasibility study? 404.23... feasibility study yourself or though a contractor, Reclamation will evaluate whether you, your technical staff, or contractor are qualified to perform the appraisal investigation or feasibility study based on...

  16. 77 FR 4632 - Defense Federal Acquisition Regulation Supplement; Independent Research and Development Technical...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-30

    ... aggregate IR&D costs or the costs of an individual IR&D project. The threshold for triggering the reporting... Agency auditor to support the allowability of the costs. Contractors that do not meet the threshold as a... provide in-process information from IR&D projects, for which reimbursement, as an allowable indirect cost...

  17. Risk Management for the International Space Station

    NASA Technical Reports Server (NTRS)

    Sebastian, J.; Brezovic, Philip

    2002-01-01

    The International Space Station (ISS) is an extremely complex system, both technically and programmatically. The Space Station must support a wide range of payloads and missions. It must be launched in numerous launch packages and be safely assembled and operated in the harsh environment of space. It is being designed and manufactured by many organizations, including the prime contractor, Boeing, the NASA institutions, and international partners and their contractors. Finally, the ISS has multiple customers, (e.g., the Administration, Congress, users, public, international partners, etc.) with contrasting needs and constraints. It is the ISS Risk Management Office strategy to proactively and systematically manages risks to help ensure ISS Program success. ISS program follows integrated risk management process (both quantitative and qualitative) and is integrated into ISS project management. The process and tools are simple and seamless and permeate to the lowest levels (at a level where effective management can be realized) and follows the continuous risk management methodology. The risk process assesses continually what could go wrong (risks), determine which risks need to be managed, implement strategies to deal with those risks, and measure effectiveness of the implemented strategies. The process integrates all facets of risk including cost, schedule and technical aspects. Support analysis risk tools like PRA are used to support programatic decisions and assist in analyzing risks.

  18. The Pioneer Projects - Economical exploration of the solar system

    NASA Technical Reports Server (NTRS)

    Spahr, J. R.; Hall, C. F.

    1975-01-01

    The interplanetary Pioneer missions are reviewed in terms of management implications and cost control. The responsibilities, organizational structure, and management practices of the Pioneer Projects are presented. The lines of authority and areas of responsibility of the principal organizational elements supporting the Pioneer missions are identified, and the methods employed for maintaining effective and timely interactions among these elements are indicated. The technical and administrative functions of various organizational elements of the project are described. The management and control of activities prior to and during the hardware procurement phase are described to indicate the basis for obtaining visibility of the technical progress, utilization of resources, and cost performance of the contractors and other institutions supporting the Pioneer projects.

  19. Hanford internal dosimetry program manual

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carbaugh, E.H.; Sula, M.J.; Bihl, D.E.

    1989-10-01

    This document describes the Hanford Internal Dosimetry program. Program Services include administrating the bioassay monitoring program, evaluating and documenting assessments of internal exposure and dose, ensuring that analytical laboratories conform to requirements, selecting and applying appropriate models and procedures for evaluating internal radionuclide deposition and the resulting dose, and technically guiding and supporting Hanford contractors in matters regarding internal dosimetry. 13 refs., 16 figs., 42 tabs.

  20. Scientific and Technical Information Output of the Langley Research Center, for calendar year 1976

    NASA Technical Reports Server (NTRS)

    1976-01-01

    Documents listed include NASA Technical Reports, Technical Notes, Technical Memorandums, Special Publications, Contractor Reports, journal articles, and technical presentations made at Society meetings. NASA formal reports listed are those that were mailed and distributed to the ultimate user. The material presented here is listed first by Division and then under the following headings: (a) Formal Reports, (b) Contractor Reports, (c) Articles and Meeting Presentations, and (d) High Number Technical Memorandums (High TMX's). Under each heading, the material cited authors in alphabetical order. If a report has more than one author and these authors are from different Divisions, the report is listed only once, under the senior author's name.

  1. Installation restoration program. Closure assessment report for UST removals at sites 4 and 5 - petroleum, oils, and lubricants facility. Virginia Air National Guard, 192nd Fighter Group, Richmond International Airport, Sandston, Virginia. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    The objectives of the closure assessment were to determine the extent of contaminated soil adjacent to the USTs requiring excavation, to provide documentation of soil and groundwater conditions following excavation, and to document closure activities in accordance with applicable VADEQ regulations. During closure activities, ASI provided technical support to the Base to ensure that the UST removal contractor (E K, Inc.) hereinafter referred to as the Contractor was in compliance with the technical requirements (as specified in the Plans and Specifications for Removal of Abandoned Underground Storage Tanks, Virginia Air National Guard, Richmond International Airport, Sandston, VA., dated July 1991more » and revised April 1992, and Addendum Numbers 1 through 7) of the contract. ASI was also responsible for collecting soil and/or groundwater closure samples from the excavations, and providing off-site fixed based laboratory analysis to verify clean conditions within the excavations.« less

  2. 48 CFR 2009.570-3 - Criteria for recognizing contractor organizational conflicts of interest.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... reactor component that is unique to one type of advanced reactor. As is the case with other technically... contractor prepares plans for specific approaches or methodologies that are to be incorporated into competitive procurements using the approaches or methodologies. (iii) Where the offeror or contractor is...

  3. 48 CFR 2009.570-3 - Criteria for recognizing contractor organizational conflicts of interest.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... reactor component that is unique to one type of advanced reactor. As is the case with other technically... contractor prepares plans for specific approaches or methodologies that are to be incorporated into competitive procurements using the approaches or methodologies. (iii) Where the offeror or contractor is...

  4. 48 CFR 2009.570-3 - Criteria for recognizing contractor organizational conflicts of interest.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... reactor component that is unique to one type of advanced reactor. As is the case with other technically... contractor prepares plans for specific approaches or methodologies that are to be incorporated into competitive procurements using the approaches or methodologies. (iii) Where the offeror or contractor is...

  5. 48 CFR 2009.570-3 - Criteria for recognizing contractor organizational conflicts of interest.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... reactor component that is unique to one type of advanced reactor. As is the case with other technically... contractor prepares plans for specific approaches or methodologies that are to be incorporated into competitive procurements using the approaches or methodologies. (iii) Where the offeror or contractor is...

  6. 48 CFR 2009.570-3 - Criteria for recognizing contractor organizational conflicts of interest.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... reactor component that is unique to one type of advanced reactor. As is the case with other technically... contractor prepares plans for specific approaches or methodologies that are to be incorporated into competitive procurements using the approaches or methodologies. (iii) Where the offeror or contractor is...

  7. 48 CFR 49.305-1 - General.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... the work performed by the contractor (e.g., planning, scheduling, technical study, engineering work production and supervision, placing and supervising subcontracts, and work performed by the contractor in (1...

  8. 48 CFR 49.305-1 - General.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... the work performed by the contractor (e.g., planning, scheduling, technical study, engineering work production and supervision, placing and supervising subcontracts, and work performed by the contractor in (1...

  9. 48 CFR 49.305-1 - General.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... the work performed by the contractor (e.g., planning, scheduling, technical study, engineering work production and supervision, placing and supervising subcontracts, and work performed by the contractor in (1...

  10. 48 CFR 49.305-1 - General.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... the work performed by the contractor (e.g., planning, scheduling, technical study, engineering work production and supervision, placing and supervising subcontracts, and work performed by the contractor in (1...

  11. Work management plan for data systems and analysis directorate

    NASA Technical Reports Server (NTRS)

    Nichols, L. R.

    1979-01-01

    A contract with the Data Systems and Analysis Directorate contains a specified level of resources related to a specific set of work in support of three divisions within the Data Systems and Analysis Directorate. The divisions are Institutional Data Systems Division, Ground Data Systems Division, and Mission Planning and Analysis Division. The Statement of work defines at a functional requirements level the type of support to be provided to the three divisions. The contract provides for further technical direction to the contractor through issuance of Job Orders. The Job order is the prime method of further defining the work to be done, allocating a portion of the total resources in the contract to the defined tasks, and further delegating technical responsibility.

  12. 48 CFR 209.570-3 - Procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... prospective contractor meets the definition of “lead system integrator”; (2) Consider all information... workforce or a system engineering and technical assistance contractor; (2) Shall include a plan for phasing...

  13. 48 CFR 245.603-70 - Contractor performance of plant clearance duties.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Government-furnished property from inventory schedules; (v) Evaluate physical, quantitative, and technical allocability of contractor inventory prior to disposal using Standard Form 1423, Inventory Verification Survey...

  14. 48 CFR 1852.212-70 - Notice of delay.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Delay (DEC 1988) If, because of technical difficulties, the Contractor becomes unable to complete the... performing the work called for under this contract, the Contractor shall give the Contracting Officer written...

  15. 48 CFR 1852.212-70 - Notice of delay.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Delay (DEC 1988) If, because of technical difficulties, the Contractor becomes unable to complete the... performing the work called for under this contract, the Contractor shall give the Contracting Officer written...

  16. 48 CFR 1852.212-70 - Notice of delay.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Delay (DEC 1988) If, because of technical difficulties, the Contractor becomes unable to complete the... performing the work called for under this contract, the Contractor shall give the Contracting Officer written...

  17. 48 CFR 1852.212-70 - Notice of delay.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Delay (DEC 1988) If, because of technical difficulties, the Contractor becomes unable to complete the... performing the work called for under this contract, the Contractor shall give the Contracting Officer written...

  18. 48 CFR 1852.212-70 - Notice of delay.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Delay (DEC 1988) If, because of technical difficulties, the Contractor becomes unable to complete the... performing the work called for under this contract, the Contractor shall give the Contracting Officer written...

  19. 48 CFR 209.505-4 - Obtaining access to proprietary information.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...) For contractors accessing third party proprietary technical data or computer software, non-disclosure... limited rights technical data, commercial technical data, or restricted rights computer software. The...

  20. Fiscal year 1979 scientific and technical reports, articles, papers and presentations

    NASA Technical Reports Server (NTRS)

    White, O. L. (Compiler)

    1979-01-01

    This bibliography lists approximately 590 formal NASA technical reports, papers published in technical journals, presentations by MSFC personnel, and reports of MSFC contractors introduced into the NASA scientific and technical information system in 1979.

  1. OSH technical reference manual

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-11-01

    In an evaluation of the Department of Energy (DOE) Occupational Safety and Health programs for government-owned contractor-operated (GOCO) activities, the Department of Labor`s Occupational Safety and Health Administration (OSHA) recommended a technical information exchange program. The intent was to share written safety and health programs, plans, training manuals, and materials within the entire DOE community. The OSH Technical Reference (OTR) helps support the secretary`s response to the OSHA finding by providing a one-stop resource and referral for technical information that relates to safe operations and practice. It also serves as a technical information exchange tool to reference DOE-wide materials pertinentmore » to specific safety topics and, with some modification, as a training aid. The OTR bridges the gap between general safety documents and very specific requirements documents. It is tailored to the DOE community and incorporates DOE field experience.« less

  2. 48 CFR 2052.209-72 - Contractor organizational conflicts of interest.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) Does not obtain an unfair competitive advantage over other parties by virtue of its performance of this... technical bias or unfair competitive advantage. (d) Disclosure after award. (1) The contractor warrants that...

  3. FY 1986 scientific and technical reports, articles, papers and presentations

    NASA Technical Reports Server (NTRS)

    Turner, Joyce E. (Compiler)

    1986-01-01

    Formal NASA technical reports, papers published in technical journals, and presentations by Marshall Space Flight Center (MSFC) personnel in FY-86 are presented. Also included are papers of MSFC contractors.

  4. FY 1980 scientific and technical reports, articles, papers, and presentations

    NASA Technical Reports Server (NTRS)

    White, O. L. (Compiler)

    1980-01-01

    Abstracts are presented for 60 technical memoranda and 5 technical papers published in technical journals or presented by MSFC personnel in FY 1980. Conference and reference publications are cited along with contractor reports and papers cleared for presentation.

  5. FY 1984 scientific and technical reports, articles, papers and presentations

    NASA Technical Reports Server (NTRS)

    Turner, J. E. (Compiler)

    1984-01-01

    This bibliography lists formal NASA technical reports, papers published in technical journals, and presentations by MSFC personnel. Abstracts are presented for 56 technical memorandum, and 13 technical papers. Six publications, over 260 contractor reports, and more than 300 papers cleared for publication are cited.

  6. 48 CFR 2052.211-71 - Technical progress report.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Technical progress report... Technical progress report. As prescribed at 2011.104-70(b), the contracting officer shall insert the... solicitation. Technical Progress Report (JAN 1993) The contractor shall provide a monthly Technical Progress...

  7. 48 CFR 2052.211-71 - Technical progress report.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Technical progress report... Technical progress report. As prescribed at 2011.104-70(b), the contracting officer shall insert the... solicitation. Technical Progress Report (JAN 1993) The contractor shall provide a monthly Technical Progress...

  8. 48 CFR 2052.211-71 - Technical progress report.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Technical progress report... Technical progress report. As prescribed at 2011.104-70(b), the contracting officer shall insert the... solicitation. Technical Progress Report (JAN 1993) The contractor shall provide a monthly Technical Progress...

  9. 48 CFR 2052.211-71 - Technical progress report.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Technical progress report... Technical progress report. As prescribed at 2011.104-70(b), the contracting officer shall insert the... solicitation. Technical Progress Report (JAN 1993) The contractor shall provide a monthly Technical Progress...

  10. NASA Langley Scientific and Technical Information Output: 1998

    NASA Technical Reports Server (NTRS)

    Machie, Harriet B. (Compiler); Stewart, Susan H. (Compiler)

    1999-01-01

    This document is a compilation of the scientific and technical information that the Langley Research Center has produced during the calendar year 1998. Included are citations for Technical Publications, Conference Publications, Technical Memorandums, Contractor Reports, Journal Articles and Book Publications, Meeting Presentations, Technical Talks, and Patents.

  11. NASA Langley Scientific and Technical Information Output-2001

    NASA Technical Reports Server (NTRS)

    Stewart, Susan H. (Compiler)

    2002-01-01

    This document is a compilation of the scientific and technical information that the Langley Research Center has produced during the 2001 calendar year. Included are citations for Technical Publications, Conference Publications, Technical Memorandums, Contractor Reports, Journal Articles and Book Publications, Meeting Presentations, Technical Talks, and Patents.

  12. NASA Langley Scientific and Technical Information Output-2002

    NASA Technical Reports Server (NTRS)

    Stewart, Susan H. (Compiler)

    2003-01-01

    This document is a compilation of the scientific and technical information that the Langley Research Center has produced during the calendar year 2002. Included are citations for Technical Publications, Conference Publications, Technical Memorandums, Contractor Reports, Journal Articles and Book Publications, Meeting Presentations, Technical Talks, and Patents.

  13. Outsourcing strategy and tendering methodology for the operation and maintenance of CERN’s cryogenic facilities

    NASA Astrophysics Data System (ADS)

    Serio, L.; Bremer, J.; Claudet, S.; Delikaris, D.; Ferlin, G.; Ferrand, F.; Pezzetti, M.; Pirotte, O.

    2017-12-01

    CERN operates and maintains the world largest cryogenic infrastructure ranging from ageing but well maintained installations feeding detectors, test facilities and general services, to the state-of-the-art cryogenic system serving the flagship LHC machine complex. A study was conducted and a methodology proposed to outsource to industry the operation and maintenance of the whole cryogenic infrastructure. The cryogenic installations coupled to non LHC-detectors, test facilities and general services infrastructure have been fully outsourced for operation and maintenance on the basis of performance obligations. The contractor is responsible for the operational performance of the installations based on a yearly operation schedule provided by CERN. The maintenance of the cryogenic system serving the LHC machine and its detectors has been outsourced on the basis of tasks oriented obligations, monitored by key performance indicators. CERN operation team, with the support of the contractor operation team, remains responsible for the operational strategy and performances. We report the analysis, strategy, definition of the requirements and technical specifications as well as the achieved technical and economic performances after one year of operation.

  14. Project management in the Apollo program: An interdisciplinary study

    NASA Technical Reports Server (NTRS)

    Drucker, E. E.; Pooler, W. S.; Wilemon, D. L.; Wood, B. D.

    1972-01-01

    Findings concerning project management in the NASA Apollo program are presented. The Apollo program in the context of the total NASA organization is examined along with the nature of project management and the manner in which project managers functioned in the Apollo program. The utilization of the in-house technical competence in the support of the Apollo program, and the formal and informal relationships between Apollo managers and the contractors are discussed.

  15. 48 CFR 35.010 - Scientific and technical reports.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 35.010 Scientific and technical reports. (a) R&D contracts shall require contractors to furnish scientific and technical reports... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Scientific and technical...

  16. 48 CFR 35.010 - Scientific and technical reports.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 35.010 Scientific and technical reports. (a) R&D contracts shall require contractors to furnish scientific and technical reports... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Scientific and technical...

  17. 48 CFR 242.7400 - General.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Contractor Facilities 242.7400 General. (a) Program managers may conclude that they need technical... manager may assign technical representatives under the procedures in 242.7401. (b) A technical representative is a representative of a DoD program, project, or system office performing non-CAS technical...

  18. 48 CFR 242.7400 - General.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Contractor Facilities 242.7400 General. (a) Program managers may conclude that they need technical... manager may assign technical representatives under the procedures in 242.7401. (b) A technical representative is a representative of a DoD program, project, or system office performing non-CAS technical...

  19. 48 CFR 35.010 - Scientific and technical reports.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Scientific and technical... SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 35.010 Scientific and technical reports. (a) R&D contracts shall require contractors to furnish scientific and technical reports...

  20. 48 CFR 35.010 - Scientific and technical reports.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Scientific and technical... SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 35.010 Scientific and technical reports. (a) R&D contracts shall require contractors to furnish scientific and technical reports...

  1. 48 CFR 35.010 - Scientific and technical reports.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Scientific and technical... SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 35.010 Scientific and technical reports. (a) R&D contracts shall require contractors to furnish scientific and technical reports...

  2. NASA Langley Scientific and Technical Information Output 2000

    NASA Technical Reports Server (NTRS)

    Machie, Harriet B. (Compiler); Stewart, Susan H. (Compiler)

    2001-01-01

    This document is a compilation of the scientific and technical information that the Langley Research Center has produced during the calendar year 2000. Included are citations for Special Publications, Technical Publications, Conference Publications, Technical Memorandum, Contractor Reports, Journal Articles and Book Publications, Meeting Presentations, Technical Talks, Tech Briefs, and Patents.

  3. NASA Langley Scientific and Technical Information Output?2003

    NASA Technical Reports Server (NTRS)

    Stewart, Susan H. (Compiler)

    2004-01-01

    This document is a compilation of the scientific and technical information that the Langley Research Center has produced during the calendar year 2003. Included are citations for Special Publications, Technical Publications, Conference Publications, Technical Memorandums, Contractor Reports, Journal Articles and Book Publications, Meeting Presentations, Technical Talks, and Patents.

  4. NASA Langley Scientific and Technical Information Output: 1999

    NASA Technical Reports Server (NTRS)

    Stewart, Susan H. (Compiler); Machie, Harriet (Compiler)

    2000-01-01

    This document is a compilation of the scientific and technical information that the Langley Research Center has produced during the calendar year 1999. Included are citations for Special Publications, Technical Publications, Conference Publications, Technical Memorandums, Contractor Reports, Journal Articles and Book Publications, Meeting Presentations, Technical Talks, Tech Briefs, and Patents.

  5. The Study of the Phase Characteristics of Bragg Cells for Acousto-Optic Signal Processing

    DTIC Science & Technology

    1998-01-01

    contractor will determine the relationship of phase characteristics between TeO2 and GaAs cells with their constructive and technical parameters. Design a...Braggcell TeO2 with minimal phase distortions operating near 100 MHz. Experimentally investigate the phase characteristics for a Bragg cell on TeO2 ...follows: The contractor will determine the relationship of phase characteristics between TeO2 and GaAs cells with their constructive and technical

  6. Industry perspectives on Plug-& -Play Spacecraft Avionics

    NASA Astrophysics Data System (ADS)

    Franck, R.; Graven, P.; Liptak, L.

    This paper describes the methodologies and findings from an industry survey of awareness and utility of Spacecraft Plug-& -Play Avionics (SPA). The survey was conducted via interviews, in-person and teleconference, with spacecraft prime contractors and suppliers. It focuses primarily on AFRL's SPA technology development activities but also explores the broader applicability and utility of Plug-& -Play (PnP) architectures for spacecraft. Interviews include large and small suppliers as well as large and small spacecraft prime contractors. Through these “ product marketing” interviews, awareness and attitudes can be assessed, key technical and market barriers can be identified, and opportunities for improvement can be uncovered. Although this effort focuses on a high-level assessment, similar processes can be used to develop business cases and economic models which may be necessary to support investment decisions.

  7. Nevada applied ecology group publications

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chilton, B.D.; Pfuderer, H.A.; Cox, T.L.

    Since January 1972, the Nevada Applied Ecology Information Center (NAEIC), Information Research and Analysis Section, Health and Safety Research Division, Oak Ridge National Laboratory, has provided technical information support to the Nevada Applied Ecology Group (NAEG) relevant to the behavior of specific radionuclides, primarily plutonium and americium, in the environment, with special emphasis on pathways to man. This bibliography represents a summary of the biomedical and environmental studies conducted by the NAEG and its contractors. The bibliography focuses on research sponsored by the NAEG. Subject areas of the publications include cover studies of soil, vegetation, animals, microorganisms, resuspension, and meteorology.more » All references in this publication are stored in a computerized form that is readily available for searches upon request to NAEG and it contractors. 558 refs.« less

  8. 48 CFR 9.502 - Applicability.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... CONTRACTOR QUALIFICATIONS Organizational and Consultant Conflicts of Interest 9.502 Applicability. (a) This... limited to any particular kind of acquisition. However, organizational conflicts of interest are more... professional services; (3) Contractor performance of or assistance in technical evaluations; or (4) Systems...

  9. Tank waste remediation system retrieval and disposal mission readiness-to-proceed responses to internal independent assessment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schaus, P.S.

    1998-01-06

    The US Department of Energy (DOE) is planning to make critical decisions during fiscal year (FY) 1998 regarding privatization contracts for the treatment of Hanford tank waste. Specifically, DOE, Richland Operations Office (RL), will make decisions related to proceeding with Phase 1 Privatization. In support of these decisions, the management and integration (M+I) contractor must be able to meet the requirements to support the Phase 1 privatization contractors. As part of the assessment of the Tank Waste Retrieval (TWR) Readiness-To-Proceed (RTP), an independent review of their process and products was required by the RL letter of August 8, 1997. Themore » Independent Review Team reviewed the adequacy of the planning that has been done by the M+I contractor to validate that, if the plans are carried out, there is reasonable assurance of success. Overall, the RTP Independent Review Team concluded that, if the planning by the M+I contractor team is carried out with adequate funding, there is reasonable assurance that the M+I contractor will be able to deliver waste to the privatization contractor for the duration of Phase 1. This conclusion was based on addressing the recommendations contained in the Independent Review Team`s Final Report and in the individual Criteria and Review Approach (CRA) forms completed during the assessment. The purpose of this report is to formally document the independent assessment and the RTP team responses to the Independent Review Team recommendations. It also provides closure logics for selected recommendations from a Lockheed Martin Hanford Corporation (LMHC) internal assessment of the Technical Basis Review (TBR) packages. This report contains the RTP recommendation closure process (Section 2.0); the closure tables (Section 3.0) which provide traceability between each review team recommendation and its corresponding Project Hanford Management Contract closure logic; and two attachments that formally document the Independent Review Team Final Report and the Internal Assessment Final Report.« less

  10. Issues With Access to Acquisition Data and Information in the Department of Defense

    DTIC Science & Technology

    2017-01-01

    both procurement and operations), technical performance, contracts and contractor performance, and program decision memo- randa. These data are...the cost of weapon systems (both procurement and operations), techni- cal performance, contracts and contractor performance, and program decision...and tracking sensitive data, and 19 percent have no method at all (Trustwave, 2014, p. 4; Kerner, 2014). U.S. defense contractors face similar

  11. Fiscal year 1981 scientific and technical reports, articles, papers, and presentations

    NASA Technical Reports Server (NTRS)

    Thacker, S. S. (Compiler)

    1981-01-01

    This bibliography lists approximately 503 formal NASA technical reports, papers published in technical journals, and presentations by MSFC personnel in FY-1981. It also includes papers of MSFC contractors. Citations announced in the NASA scientific and technical information system are noted.

  12. 48 CFR 2052.216-72 - Task order procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...; (5) Technical skills required; and (6) Estimated level of effort. (b) Task order technical proposal. By the date specified in the TORFP, the contractor shall deliver to the contracting officer a written or verbal (as specified in the TORFP technical proposal submittal instructions) technical proposal...

  13. 78 FR 70569 - Technical Mapping Advisory Council

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-26

    ... DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency [Docket ID: FEMA-2013-0039] Technical Mapping Advisory Council AGENCY: Federal Emergency Management Agency, DHS. ACTION: Notice... Technical Mapping Advisory Council (TMAC). The notice incorrectly stated that contractors and potential...

  14. Hanford Internal Dosimetry Project manual. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carbaugh, E.H.; Bihl, D.E.; MacLellan, J.A.

    1994-07-01

    This document describes the Hanford Internal Dosimetry Project, as it is administered by Pacific Northwest Laboratory (PNL) in support of the US Department of Energy and its Hanford contractors. Project services include administrating the bioassay monitoring program, evaluating and documenting assessment of potential intakes and internal dose, ensuring that analytical laboratories conform to requirements, selecting and applying appropriate models and procedures for evaluating radionuclide deposition and the resulting dose, and technically guiding and supporting Hanford contractors in matters regarding internal dosimetry. Specific chapters deal with the following subjects: practices of the project, including interpretation of applicable DOE Orders, regulations, andmore » guidance into criteria for assessment, documentation, and reporting of doses; assessment of internal dose, including summary explanations of when and how assessments are performed; recording and reporting practices for internal dose; selection of workers for bioassay monitoring and establishment of type and frequency of bioassay measurements; capability and scheduling of bioassay monitoring services; recommended dosimetry response to potential internal exposure incidents; quality control and quality assurance provisions of the program.« less

  15. 48 CFR 1348.102 - Policies.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... ENGINEERING Policies and Procedures 1348.102 Policies. (a) Contracting activities shall send contractor-submitted Value Engineering Change Proposals (VECPs) to the appropriate technical personnel for review. (b... adequacy of the contractor's estimate of cost savings; make a written report; and recommend acceptance or...

  16. 48 CFR 1348.102 - Policies.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... ENGINEERING Policies and Procedures 1348.102 Policies. (a) Contracting activities shall send contractor-submitted Value Engineering Change Proposals (VECPs) to the appropriate technical personnel for review. (b... adequacy of the contractor's estimate of cost savings; make a written report; and recommend acceptance or...

  17. 48 CFR 1348.102 - Policies.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... ENGINEERING Policies and Procedures 1348.102 Policies. (a) Contracting activities shall send contractor-submitted Value Engineering Change Proposals (VECPs) to the appropriate technical personnel for review. (b... adequacy of the contractor's estimate of cost savings; make a written report; and recommend acceptance or...

  18. Fingerprinting of Materials: Technical Supplement

    NASA Technical Reports Server (NTRS)

    Workman, Gary L.

    1992-01-01

    This supplement to the Guidelines for Maintaining a Chemical Fingerprinting Program has been developed to assist NASA personnel, contractors, and sub-contractors in defining the technical aspects and basic concepts which can be used in chemical fingerprinting programs. This material is not meant to be totally inclusive to all chemical fingerprinting programs, but merely to present current concepts. Each program will be tailored to meet the needs of the individual organizations using chemical fingerprinting to improve their quality and reliability in the production of aerospace systems.

  19. International Space Station ECLSS Technical Task Agreement Summary Report

    NASA Technical Reports Server (NTRS)

    Ray, C. D. (Compiler); Salyer, B. H. (Compiler)

    1999-01-01

    This Technical Memorandum provides a summary of current work accomplished under Technical Task Agreement (TTA) by the Marshall Space Flight Center (MSFC) regarding the International Space Station (ISS) Environmental Control and Life Support System (ECLSS). Current activities include ECLSS component design and development, computer model development, subsystem/integrated system testing, life testing, and general test support provided to the ISS program. Under ECLSS design, MSFC was responsible for the six major ECLSS functions, specifications and standard, component design and development, and was the architectural control agent for the ISS ECLSS. MSFC was responsible for ECLSS analytical model development. In-house subsystem and system level analysis and testing were conducted in support of the design process, including testing air revitalization, water reclamation and management hardware, and certain nonregenerative systems. The activities described herein were approved in task agreements between MSFC and NASA Headquarters Space Station Program Management Office and their prime contractor for the ISS, Boeing. These MSFC activities are in line to the designing, development, testing, and flight of ECLSS equipment planned by Boeing. MSFC's unique capabilities for performing integrated systems testing and analyses, and its ability to perform some tasks cheaper and faster to support ISS program needs, are the basis for the TTA activities.

  20. Scientific and technical information output of the Langley Research Center

    NASA Technical Reports Server (NTRS)

    1984-01-01

    Scientific and technical information that the Langley Research Center produced during the calendar year 1983 is compiled. Included are citations for Formal Reports, Quick-Release Technical Memorandums, Contractor Reports, Journal Articles and other Publications, Meeting Presentations, Technical Talks, Computer Programs, Tech Briefs, and Patents.

  1. 48 CFR 2052.215-71 - Project officer authority.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... of the work description. (3) Review and, where required by the contract, approve technical reports... subject to the technical direction of the NRC project officer. The term technical direction is defined to include the following: (1) Technical direction to the contractor which shifts work emphasis between areas...

  2. 48 CFR 2052.215-71 - Project officer authority.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... of the work description. (3) Review and, where required by the contract, approve technical reports... subject to the technical direction of the NRC project officer. The term technical direction is defined to include the following: (1) Technical direction to the contractor which shifts work emphasis between areas...

  3. 48 CFR 2052.215-71 - Project officer authority.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... of the work description. (3) Review and, where required by the contract, approve technical reports... subject to the technical direction of the NRC project officer. The term technical direction is defined to include the following: (1) Technical direction to the contractor which shifts work emphasis between areas...

  4. 48 CFR 2052.215-71 - Project officer authority.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... of the work description. (3) Review and, where required by the contract, approve technical reports... subject to the technical direction of the NRC project officer. The term technical direction is defined to include the following: (1) Technical direction to the contractor which shifts work emphasis between areas...

  5. 48 CFR 952.242-70 - Technical direction.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... contract. (d) All technical direction shall be issued in writing by the COR. (e) The Contractor must... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Technical direction. 952... FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 952.242-70 Technical...

  6. 48 CFR 1852.242-70 - Technical direction.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Direction (SEP 1993) (a) Performance of the work under this contract is subject to the written technical... the Contracting Officer in writing in accordance with NASA FAR Supplement 1842.270. “Technical... in writing by the COTR. (d) The Contractor shall proceed promptly with the performance of technical...

  7. 10 CFR 436.33 - Procedures and methods for contractor selection.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... for contractor selection. (a) Competitive selection. Competitive selections based on solicitation of... synopsizes the proposed contract action. (2) Each competitive solicitation— (i) Shall request technical and... from those within the competitive range. (b) Unsolicited proposals. Federal agencies may— (1) Consider...

  8. Total Quality Management in Space Shuttle Main Engine manufacturing

    NASA Technical Reports Server (NTRS)

    Ding, J.

    1992-01-01

    The Total Quality Management (TQM) philosophy developed in the Marshall Space Flight Center (MSFC) is briefly reviewed and the ongoing TQM implementation effort which is being pursued through the continuous improvement (CI) process is discussed. TQM is based on organizational excellence which integrates the new supportive culture with the technical tools necessary to identify, assess, and correct manufacturing processes. Particular attention is given to the prime contractor's change to the organizational excellence management philosophy in SSME manufacturing facilities.

  9. The Technical Work Plan Tracking Tool

    NASA Technical Reports Server (NTRS)

    Chullen, Cinda; Leighton, Adele; Weller, Richard A.; Woodfill, Jared; Parkman, William E.; Ellis, Glenn L.; Wilson, Marilyn M.

    2003-01-01

    The Technical Work Plan Tracking Tool is a web-based application that enables interactive communication and approval of contract requirements that pertain to the administration of the Science, Engineering, Analysis, and Test (SEAT) contract at Johnson Space Center. The implementation of the application has (1) shortened the Technical Work Plan approval process, (2) facilitated writing and documenting requirements in a performance-based environment with associated surveillance plans, (3) simplified the contractor s estimate of the cost for the required work, and (4) allowed for the contractor to document how they plan to accomplish the work. The application is accessible to over 300 designated NASA and contractor employees via two Web sites. For each employee, the application regulates access according to the employee s authority to enter, view, and/or print out diverse information, including reports, work plans, purchase orders, and financial data. Advanced features of this application include on-line approval capability, automatic e-mail notifications requesting review by subsequent approvers, and security inside and outside the firewall.

  10. Audit Report on "Work for Others Performed by the Department of Energy for the Department of Defense"

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    Pursuant to the Atomic Energy Act of 1954, as amended, and the Economy Act of 1932, the Department of Energy and its semi-autonomous National Nuclear Security Administration (NNSA) provide research and technical assistance to other Federal agencies on a reimbursable, full cost recovery basis through the Work for Others (WFO) program. For the vast majority of WFO technical projects, Department Federal officials furnish administrative project oversight while the actual detailed scientific or technical work is completed by the Department's 'management and operating' contractors. These contractors are awarded a special contract type specifically created under the Federal Acquisition Regulation to managemore » and operate Department sites and facilities, including sophisticated laboratories and technical centers, on a government-owned, contractor-operated basis. With annual expenditures exceeding $1 billion, the Department of Defense (DoD) is one of the Department's largest WFO customers. Work performed for DoD at the Department's national laboratories and other facilities includes highly technical research in areas such as nuclear weapons systems, counter-terrorism, and in-theater troop support. The National Defense Authorization Act for Fiscal Year (FY) 2009, required the Inspectors General of the DoD and the Department to review procurement methods to determine whether the Department complied with DoD procurement requirements and/or whether alternative procurement policies were in place. In response, we focused our review on projects performed by NNSA because it completes the vast majority (approximately $900 million in FY 2008) of the Department's work for DoD. As part of this effort, and, at the specific request of the DoD Office of Inspector General (DoD OIG), we identified the universe of WFO technical projects that received new funding in the fourth quarter of FY 2008 at NNSA sites. We independently reviewed a judgmental sample of 11 projects selected by the DoD OIG to meet the objectives of this audit. Our review revealed that NNSA managed DoD WFO technical projects in a manner consistent with requirements of the Atomic Energy Act of 1954, the Federal Acquisition Regulation, and the Department's implementing guidance, the Department of Energy Acquisition Regulation. Because of the very nature of the Department's management and operating contracting model, WFO projects may not be technically compliant with DoD procurement regulations in certain instances. We found that NNSA did not let new contracts or task orders for the DoD WFO technical projects we reviewed and instead managed them under its existing internal control process as part of its management and operating contract structure. In one instance, we noted that the Department had, at DoD's request, supplemented its control structure to incorporate specific DoD procurement requirements. Senior Department of Energy procurement officials acknowledged that neither the Department nor NNSA modified their existing prime contracts to incorporate specific defense procurement requirements because such modifications would be inappropriate, costly, and inefficient. In short, they informed us that the Department had developed and implemented a series of controls designed to monitor overall contractor performance, including WFO technical projects. Department and NNSA officials noted, however, that they were willing to incorporate DoD specific requirements into work orders should DoD request and fund such efforts. Additional details regarding management of WFO technical projects are discussed in the body of this report.« less

  11. 40 CFR 35.4190 - How does my group identify a qualified technical advisor?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... technical advisor? 35.4190 Section 35.4190 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Technical Assistance Procuring A Technical Advisor Or Other Contractor with Tag Funds § 35.4190 How does my group identify a qualified...

  12. Naval Training Device Center Index of Technical Reports.

    ERIC Educational Resources Information Center

    Walker, Lemuel E.

    Published Naval Training Device Center technical reports and some technical notes (those available through the Defense Documentation Center-DDC) which have resulted from basic research, exploratory development, and advanced development type projects are listed. The reports are indexed by technical note number, by title, and by contractor code. The…

  13. 48 CFR 9.505-1 - Providing systems engineering and technical direction.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... engineering and technical direction. 9.505-1 Section 9.505-1 Federal Acquisition Regulations System FEDERAL... of Interest 9.505-1 Providing systems engineering and technical direction. (a) A contractor that provides systems engineering and technical direction for a system but does not have overall contractual...

  14. 48 CFR 9.505-1 - Providing systems engineering and technical direction.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... engineering and technical direction. 9.505-1 Section 9.505-1 Federal Acquisition Regulations System FEDERAL... of Interest 9.505-1 Providing systems engineering and technical direction. (a) A contractor that provides systems engineering and technical direction for a system but does not have overall contractual...

  15. 48 CFR 9.505-1 - Providing systems engineering and technical direction.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... engineering and technical direction. 9.505-1 Section 9.505-1 Federal Acquisition Regulations System FEDERAL... of Interest 9.505-1 Providing systems engineering and technical direction. (a) A contractor that provides systems engineering and technical direction for a system but does not have overall contractual...

  16. 48 CFR 9.505-1 - Providing systems engineering and technical direction.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... engineering and technical direction. 9.505-1 Section 9.505-1 Federal Acquisition Regulations System FEDERAL... of Interest 9.505-1 Providing systems engineering and technical direction. (a) A contractor that provides systems engineering and technical direction for a system but does not have overall contractual...

  17. 48 CFR 9.505-1 - Providing systems engineering and technical direction.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... engineering and technical direction. 9.505-1 Section 9.505-1 Federal Acquisition Regulations System FEDERAL... of Interest 9.505-1 Providing systems engineering and technical direction. (a) A contractor that provides systems engineering and technical direction for a system but does not have overall contractual...

  18. 48 CFR 2052.215-71 - Project officer authority.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... directive whatever. (d) All technical directions must be issued in writing by the project officer or must be... advise the contractor in writing that, in the contracting officer's opinion, the technical direction is... subject to the technical direction of the NRC project officer. The term technical direction is defined to...

  19. NASA Langley Scientific and Technical Information Output: 1997

    NASA Technical Reports Server (NTRS)

    Stewart, Susan H. (Compiler); Machie, Harriet B. (Compiler)

    1998-01-01

    This document is a compilation of the scientific and technical information that the Langley Research Center has produced during the calendar year 1997. Included are citations for Formal Reports, Conference Publications, High-Numbered Technical Memorandums, Contractor Reports, Journal Articles and Book Publications, Meeting Presentations, Technical Talks, and Patents.

  20. 48 CFR 1348.102 - Policies.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...-submitted Value Engineering Change Proposals (VECPs) to the appropriate technical personnel for review. (b) Technical personnel shall conduct a comprehensive review of VECPs for technical feasibility, usefulness, and adequacy of the contractor's estimate of cost savings; make a written report; and recommend acceptance or...

  1. RADON REDUCTION TECHNIQUES FOR DETACHED HOUSES, TECHNICAL GUIDANCE (SECOND EDITION)

    EPA Science Inventory

    This document is intended for use by State officials, radon mitigation contractors, building contractors, concerned homeowners, and other persons as an aid in the selection, design, and operation of radon reduction measurements for houses. It is the second edition of EPA's techn...

  2. INDEPENDENT TECHNICAL ASSESSMENT OF MANAGEMENT OF STORMWATER AND WASTEWATER AT THE SEPARATIONS PROCESS RESEARCH UNIT (SPRU) DISPOSITION PROJECT, NEW YORK

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Abitz, R.; Jackson, D.; Eddy-Dilek, C.

    2011-06-27

    The U.S. Department of Energy (DOE) is currently evaluating the water management procedures at the Separations Process Research Unit (SPRU). The facility has three issues related to water management that require technical assistance: (1) due to a excessive rainfall event in October, 2010, contaminated water collected in basements of G2 and H2 buildings. As a result of this event, the contractor has had to collect and dispose of water offsite; (2) The failure of a sump pump at a KAPL outfall resulted in a Notice of Violation issued by the New York State Department of Environment and Conservation (NYSDEC) andmore » subsequent Consent Order. On-site water now requires treatment and off-site disposition; and (3) stormwater infiltration has resulted in Strontium-90 levels discharged to the storm drains that exceed NR standards. The contractor has indicated that water management at SPRU requires major staff resources (at least 50 persons). The purpose of this review is to determine if the contractor's technical approach warrants the large number of staff resources and to ensure that the technical approach is compliant and in accordance with federal, state and NR requirements.« less

  3. 48 CFR 209.505-4 - Obtaining access to proprietary information.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) Non-disclosure requirements for contractors accessing third party proprietary technical data or... may be required to enter into non-disclosure agreements directly with the third party asserting restrictions on limited rights technical data, commercial technical data, or restricted rights computer...

  4. 48 CFR 1852.219-82 - Limitation on subcontracting-STTR program.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... performed by the research institution. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval. (End of clause) [71 FR...

  5. 48 CFR 1852.219-82 - Limitation on subcontracting-STTR program.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... performed by the research institution. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval. (End of clause) [71 FR...

  6. 48 CFR 1852.219-82 - Limitation on subcontracting-STTR program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... performed by the research institution. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval. (End of clause) [71 FR...

  7. 48 CFR 1852.219-82 - Limitation on subcontracting-STTR program.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... performed by the research institution. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval. (End of clause) [71 FR...

  8. 48 CFR 1852.219-82 - Limitation on subcontracting-STTR program.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... performed by the research institution. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval. (End of clause) [71 FR...

  9. Scientific and technical information output of the Langley Research Center for Calendar Year 1985

    NASA Technical Reports Server (NTRS)

    1986-01-01

    A compilation of the scientific and technical information that the Langley Research Center has produced during the calendar year 1985 is presented. Included are citations for Formal Reports, Quick-Release Technical Memorandums, Contractor Reports, Journal Articles and Other Publications, Meeting Presentations, Technical Talks, Computer Programs, Tech Briefs, and Patents.

  10. Scientific and technical information output of the Langley Research Center for calendar year 1984

    NASA Technical Reports Server (NTRS)

    1985-01-01

    The scientific and technical information that the Langley Research Center produced during the calendar year 1984 is compiled. Approximately 1650 citations are included comprising formal reports, quick-release technical memorandums, contractor reports, journal articles and other publications, meeting presentations, technical talks, computer programs, tech briefs, and patents.

  11. NASA Langley Scientific and Technical Information Output: 1996

    NASA Technical Reports Server (NTRS)

    Stewart, Susan H. (Compiler); Phillips, Marilou S. (Compiler)

    1997-01-01

    This document is a compilation of the scientific and technical information that the Langley Research Center has produced during the calendar year 1996. Included are citations for Formal Reports, High-Numbered Conference Publications, High-Numbered Technical Memorandums, Contractor Reports, Journal Articles and Other Publications, Meeting Presentations, Technical Talks, Computer Programs, Tech Briefs, and Patents.

  12. Development of NASA Technical Standards Program Relative to Enhancing Engineering Capabilities

    NASA Technical Reports Server (NTRS)

    Gill, Paul S.; Vaughan, William W.

    2003-01-01

    The enhancement of engineering capabilities is an important aspect of any organization; especially those engaged in aerospace development activities. Technical Standards are one of the key elements of this endeavor. The NASA Technical Standards Program was formed in 1997 in response to the NASA Administrator s directive to develop an Agencywide Technical Standards Program. The Program s principal objective involved the converting Center-unique technical standards into Agency wide standards and the adoption/endorsement of non-Government technical standards in lieu of government standards. In the process of these actions, the potential for further enhancement of the Agency s engineering capabilities was noted relative to value of being able to access Agencywide the necessary full-text technical standards, standards update notifications, and integration of lessons learned with technical standards, all available to the user from one Website. This was accomplished and is now being enhanced based on feedbacks from the Agency's engineering staff and supporting contractors. This paper addresses the development experiences with the NASA Technical Standards Program and the enhancement of the Agency's engineering capabilities provided by the Program s products. Metrics are provided on significant aspects of the Program.

  13. Development and validation of a strategic repositioning model for defense and aerospace contractors

    NASA Astrophysics Data System (ADS)

    Bers, John A.

    Strategic repositioning refers to the organized efforts of defense contractors to "reposition" a technology that they have developed for a defense sector customer into a civilian or commercial market. The strategic repositioning model developed here is a structural model: it seeks to isolate the factors that influence choice of strategy, which in turn influences the organization's performance. The model draws from the prior experience of contractors (through interviews and surveys) and companies in other sectors (through a review of the relevant published research). (1) Over all, the model accounted for 55% of the variance in financial performance of the sample and 35% for the underlying population. (2) Key success factors include a rigorous planning process, a target market in the growth (vs. incubation) stage, a priority on market leadership as well as financial return, the ability to operate in an ambiguous business environment, and a relatively short time horizon but strong corporate support. (3) The greatest challenges that a contractor is likely to encounter are understanding his new customers' buying practices, strong competition, and adapting his technology to their needs and price expectations. (4) To address these issues contractors often involve partners in their entry strategy, but partnerships of equals tend to be more difficult to bring off than direct entry strategies. (5) The two major target market categories--government and commercial--present different challenges. Commercial customers are more likely to resist doing business with the contractor, while contractors entering government and other noncommercial markets are more likely to encounter price resistance, low technical sophistication among customers, and difficulties reaching their customer base. (6) Despite these differences across markets, performance is not influenced by the target market category, nor by the type of product or service or the contractor's functional orientation (marketing, technology, or operations). (7) The absence of a difference in performance may be partly due to natural selection. Noncommercial markets tend to attract contractors with more deliberative, consultative, and process-oriented corporate cultures, while commercial markets tend to attract contractors with results-oriented, opportunistic cultures.

  14. Characterization of Vertical Impact Device Acceleration Pulses Using Parametric Assessment: Phase 3 Wiaman Seat

    DTIC Science & Technology

    2016-07-01

    711 HPW/RHCPT) and their in-house technical support contractor , Infoscitex, conducted a series of tests to identify the performance capabilities of...Cell Seat Configuration Drop Ht . (in) Mean Peak Acceleration (G) Mean Velocity Change (ft/s) SH1 WS1 20 80.08 ± 3.71 13.54 ± 0.49 SH2...6. Test Matrix for VID Response with WS2 Test Cell Seat (Felt) Configuration Drop Ht . (in) Mean Peak Acceleration (G

  15. Scientific and technical information output of the Langley Research Center for calendar year 1982

    NASA Technical Reports Server (NTRS)

    1983-01-01

    Citations are presented for 1380 for formal reports; quick-release technical memorandum; contractor reports; journal articles and periodical literature; technical talks and meeting presentations; computer programs; tech briefs, and patents produced during 1982. An author index is provided.

  16. 48 CFR 1852.225-70 - Export Licenses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... writing, that the Contracting Officer authorizes it to export ITAR-controlled technical data (including... licenses or other approvals, if required, for exports of hardware, technical data, and software, or for the provision of technical assistance. (b) The Contractor shall be responsible for obtaining export licenses, if...

  17. The pioneer projects: Economical exploration of the solar system

    NASA Technical Reports Server (NTRS)

    Spahr, J. R.; Hall, C. F.

    1975-01-01

    The interplanetary Pioneer missions are reviewed in terms of management implications and cost control. The responsibilities, organizational structure, and management practices of the Pioneer Projects are presented. The lines of authority and areas of responsibility of the principal organizational elements supporting the Pioneer missions are identified, and the methods employed for maintaining effective and timely interactions among these elements are indicated. The technical and administrative functions of the various organizational elements of the Pioneer Project Office at Ames Research Center are described in terms of their management responsibilities and interactions with other elements of the Project Office and with external organizations having Pioneer Project responsibilities. The management and control of activities prior to and during the hardware procurement phase are described to indicate the basis for obtaining visibility of the technical progress, utilization of resources, and cost performance of the contractors and other institutions supporting the Pioneer projects.

  18. 48 CFR 1852.219-81 - Limitation on subcontracting-SBIR Phase II program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... must be approved in advance and in writing by the Contracting Officer. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval...

  19. 48 CFR 1852.219-81 - Limitation on subcontracting-SBIR Phase II program.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... must be approved in advance and in writing by the Contracting Officer. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval...

  20. 76 FR 31393 - Federal Acquisition Regulation; Federal Acquisition Circular 2005-52; Introduction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-31

    ... 2010-017 Robinson. Ethics Programs. VI Technical Amendments... SUPPLEMENTARY INFORMATION: Summaries for... technology that is a commercial item. Item V--Oversight of Contractor Ethics Programs (FAR Case 2010-017... Code of Business Ethics and Conduct. Contracting officers may ask to see a contractor's code of ethics...

  1. 48 CFR 252.237-7023 - Continuation of Essential Contractor Services.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... prescribed in 237.7603, use the following clause: Continuation of Mission Essential Functions (Date) (a) The... contractor services in support of mission-essential functions. The contractor-provided services that have been determined to be essential contractor services in support of mission-essential functions are...

  2. FY 2002 Scientific and Technical Reports, Articles, Papers, and Presentations

    NASA Technical Reports Server (NTRS)

    Fowler, B. A. (Compiler)

    2003-01-01

    This Technical Memorandum (TM) presents formal NASA technical reports, papers published in technical journals, and presentations by MSFC personnel in FY 2002. It also includes papers of MSFC contractors. The information in this TM may be of value to the scientific and engineering community in determining what information has been published and what is available.

  3. NASA Langley Scientific and Technical Information Output, 1995. Volume 1

    NASA Technical Reports Server (NTRS)

    Stewart, Susan H. (Compiler); Phillips, Marilou S. (Compiler)

    1996-01-01

    This document is a compilation of the scientific and technical information that the Langley Research Center has produced during the calendar year 1995. Included are citations for formal reports, high-numbered conference publications, high-numbered technical memorandums, contractor reports, journal articles and other publications, meeting presentations, technical talks, computer programs, tech briefs, and patents.

  4. 48 CFR 2131.205-43 - Trade, business, technical and professional activity costs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Trade, business, technical... Organizations 2131.205-43 Trade, business, technical and professional activity costs. (a) FEGLI Program contractors shall seek the advance written approval of the contracting officer for allowability of all or part...

  5. Technical and management information system: The tool for professional productivity on the space station program

    NASA Technical Reports Server (NTRS)

    Montoya, G.; Boldon, P.

    1985-01-01

    The Space Station Program is highly complex not only in its technological goals and requirements but also in its organizational structure. Eight Contractor teams supporting four NASA centers plus Headquarters must depend on effective exchange of information--the lifeblood of the program. The Technical and Management Information System (TMIS) is the means by which this exchange can take place. Value of the TMIS in increasing productivity comes primarily from its ability to make the right information available to whomever needs it when it is needed. Productivity of the aerospace professional and how it can be enhanced by the use of specifically recommended techniques and procedures for information management using the TMIS are discussed.

  6. 59th Medical Wing Clinical Research Division Clinical Investigations Program Posters (Count: 2)

    DTIC Science & Technology

    2017-05-08

    Calcote, Joshua - Contractor , 59 MDW/ SGVU DYES (gJ NO N I A 5. PROTOCOL TITLE: (NOTE: For each new release of medical research or technical information...Corresponding Author Joshua C. Calcote Contractor 59 MDW/ SGVU b. c. d. e. 17. IS A 502 ISG/JAC ETHICS REVIEW REQUIRED (JER DOD 5500.07-R)? DYES 181...PRESENTATION. 18. AUTHOR’S PRINTED NAME, RANK. GRADE 19. AUTHOR’S SIGNATURE Dr. Joshua C. Calcote, Contractor ~~~:.7.:.:.-:::.---=::~- -- -·--- ~- 21

  7. NASA/contractor partnership on the second TDRSS ground terminal program: Breaking barriers

    NASA Technical Reports Server (NTRS)

    Tierney, Paul G.

    1992-01-01

    The Second Tracking and Data Relay Satellite System (TDRSS) Ground Terminal (STGT) Program from its technical and programmatic backgrounds is introduced and then several techniques to enhance communication and empower the NASA Contractor team are described. A major factor in our success was an approach used to shorten the time span of the Critical Design Review phase. This approach is described. The relationships involving NASA's O&M contractor are discussed. A set of lessons learned is included.

  8. Wind Powering America State Outreach. Final Technical Report: Washington State

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stearns, Tim

    2013-09-30

    The Washington Department of Commerce, via a U.S. Department of Energy grant, supported research into siting and permitting processes for wind projects by Skagit County, Washington. The goal was to help a local government understand key issues, consider how other areas have addressed wind siting, and establish a basis for enacting permitting and zoning ordinances that provided a more predictable permitting path and process for landowners, citizens, government and developers of small and community wind projects. The County?s contractor developed a report that looked at various approaches to wind siting, interviewed stakeholders, and examined technology options. The contractor outlined keymore » issues and recommended the adoption of a siting process. The Skagit County Commission considered the report and directed the Skagit County Planning & Development Services Department to add development of wind guidelines to its work plan for potential changes to development codes.« less

  9. Proceedings of the Nimbus Program Review

    NASA Technical Reports Server (NTRS)

    Press, H.

    1962-01-01

    The Nimbus program review was conducted at the George Washington Motor Lodge and at General Electric Missiles and Space Division, Valley Forge, Pennsylvania, on November 14, 15, and 16, 1962. The purpose of the review was twofold: first, to present to top management of the Goddard Space Flight Center (GSFC), National Aeronautics and Space Administration (NASA) Headquarters, other NASA elements, Joint Meteorological Satellite Advisory Committee (_MSAC), Weather Bureau, subsystem contractors, and others, a clear picture of the Nimbus program, its organization, its past accomplishments, current status, and remaining work, emphasizing the continuing need and opportunity for major contributions by the industrial community; second, to bring together project and contractor technical personnel responsible for the planning, execution, and support of the integration and test of the spacecraft to be initiated at General Electric shortly. This book is a compilation of the papers presented during the review and also contains a list of those attending.

  10. Fusion Safety Program annual report, fiscal year 1994

    NASA Astrophysics Data System (ADS)

    Longhurst, Glen R.; Cadwallader, Lee C.; Dolan, Thomas J.; Herring, J. Stephen; McCarthy, Kathryn A.; Merrill, Brad J.; Motloch, Chester C.; Petti, David A.

    1995-03-01

    This report summarizes the major activities of the Fusion Safety Program in fiscal year 1994. The Idaho National Engineering Laboratory (INEL) is the designated lead laboratory and Lockheed Idaho Technologies Company is the prime contractor for this program. The Fusion Safety Program was initiated in 1979. Activities are conducted at the INEL, at other DOE laboratories, and at other institutions, including the University of Wisconsin. The technical areas covered in this report include tritium safety, beryllium safety, chemical reactions and activation product release, safety aspects of fusion magnet systems, plasma disruptions, risk assessment failure rate data base development, and thermalhydraulics code development and their application to fusion safety issues. Much of this work has been done in support of the International Thermonuclear Experimental Reactor (ITER). Also included in the report are summaries of the safety and environmental studies performed by the Fusion Safety Program for the Tokamak Physics Experiment and the Tokamak Fusion Test Reactor and of the technical support for commercial fusion facility conceptual design studies. A major activity this year has been work to develop a DOE Technical Standard for the safety of fusion test facilities.

  11. Contracting AFSC 651X0, AFPT 90-651-862

    DTIC Science & Technology

    1991-10-01

    CONTRACTING 78 TABLE 30 TECHNICAL TASKS NOT REFERENCED TO STS HIGH IN TRAINING EMPHASIS (TE) RATINGS TE TASKS RATING N1000 PREPARE DD FORMS 1784 5.08 M739 ...requirements with contractors or customers 89 M739 Compare contractor invoices with QAE reports 89 M731 Analyze adequacy of corrective actions to quality

  12. Bibliography of Lewis Research Center technical contributions announced in 1976

    NASA Technical Reports Server (NTRS)

    1977-01-01

    Abstracts of Lewis authored publications and publications resulting from Lewis managed contracts which were announced in the 1976 issues of STAR (Scientific and Technical Aerospace Reports) and IAA (International Aerospace Abstracts) are presented. Research reports, journal articles, conference presentations, patents and patent applications, and these are included. The arrangement is by NASA subject category. Citations indicate report literature (identified by their N-numbers) and the journal and conference presentations (identified by their A-numbers). A grouping of indexes helps locate specific publications by author (including contractor authors), contractor organization, contract number, and report number.

  13. FY 2005 Scientific and Technical Reports, Articles, Papers, and Presentations

    NASA Technical Reports Server (NTRS)

    Narmore, K. A. (Compiler)

    2007-01-01

    This Technical Memorandum (TM) presents formal NASA technical reports, papers published in technical journals, and presentations by Marshall Space Flight Center (MSFC) personnel in FY 2005. It also includes papers of MSFC contractors. The information in this TM may be of value to the scientific and engineering community in determining what information has been published and what is available.

  14. FY 1989 scientific and technical reports, articles, papers, and presentations

    NASA Technical Reports Server (NTRS)

    Turner, Joyce E. (Compiler)

    1989-01-01

    A compendium of bibliographic references to papers presented by Marshall Space Flight Center (MSFC) personnel and contractors during FY 1989 is provided. The papers include formal NASA technical reports, memoranda, papers which were published in technical journals, and presentations by MSFC personnel. The formal NASA technical reports and memoranda have abstracts included. Sources for obtaining these documents are also included.

  15. FY 1985 scientific and technical reports, articles, papers and presentations

    NASA Technical Reports Server (NTRS)

    Turner, Joyce E. (Compiler)

    1985-01-01

    This document presents formal NASA technical reports, papers published in technical journals, and presentations by Marshal Space Flight Center (MSFC) personnel in FY 85. It also includes papers of MSFC contractors. After being announced in STAR, all of the NASA series reports may be obtained from the National Technical Information Service (NTIS), 5285 Port Royal Road, Springfield, Va. 22161.

  16. The Army Did Not Effectively Monitor Contractor Performance for the Kuwait Base Operations and Security Support Services Contract

    DTIC Science & Technology

    2017-03-07

    H 7 , 2 0 1 7 Report No. DODIG-2017-062 The Army Did Not Effectively Monitor Contractor Performance for the Kuwait Base Operations and Security...The Army Did Not Effectively Monitor Contractor Performance for the Kuwait Base Operations and Security Support Services Contract March 7, 2017... contractor performance for the Kuwait Base Operations and Security Support Services (KBOSSS) contract. The KBOSSS contract is a cost-plus-award-fee

  17. FY 1991 scientific and technical reports, articles, papers, and presentations

    NASA Technical Reports Server (NTRS)

    Turner, Joyce E. (Compiler)

    1991-01-01

    Formal NASA technical reports, papers published in technical journals, and presentations by MSFC personnel in FY 1991 are presented. Papers of MSFC contractors are also included. The information in this report may be of value to the scientific and engineering community in determining what information has been published and what is available.

  18. NASA Langley scientific and technical information output: 1994, volume 1

    NASA Technical Reports Server (NTRS)

    Phillips, Marilou S. (Compiler); Stewart, Susan H. (Compiler)

    1995-01-01

    This document is a compilation of the scientific and technical information that the Langley Research Center has produced during the calendar year 1994. Included are citations for Formal Reports, High-Numbered Conference Publications, High-Numbered Technical Memorandums, Contractor Reports, Journal Articles and Other Publications, Meeting Presentations, Computer Programs, Tech Briefs, and Patents.

  19. NASA Langley Scientific and Technical Information Output: 1994. Volume 1

    NASA Technical Reports Server (NTRS)

    Phillips, Marilou S. (Compiler); Stewart, Susan H. (Compiler)

    1995-01-01

    This document is a compilation of the scientific and technical information that the Langley Research Center has produced during the calendar year 1994. Included are citations for Formal Reports, High-Numbered Conference Publications, High-Numbered Technical Memorandums, Contractor Reports, Journal Articles and Other Publications, Meeting Presentations, Computer Programs, Tech Briefs, and Patents.

  20. 48 CFR 227.7103-16 - Providing technical data to foreign governments, foreign contractors, or international...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... disclose technical data for which restrictions on use, release, or disclosure have been asserted to foreign..., modification, reproduction, release, performance, display, or disclosure of such data have been satisfied. ... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Providing technical data...

  1. 48 CFR 227.7103-16 - Providing technical data to foreign governments, foreign contractors, or international...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... disclose technical data for which restrictions on use, release, or disclosure have been asserted to foreign..., modification, reproduction, release, performance, display, or disclosure of such data have been satisfied. ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Providing technical data...

  2. 48 CFR 227.7103-16 - Providing technical data to foreign governments, foreign contractors, or international...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... disclose technical data for which restrictions on use, release, or disclosure have been asserted to foreign..., modification, reproduction, release, performance, display, or disclosure of such data have been satisfied. ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Providing technical data...

  3. 48 CFR 227.7103-16 - Providing technical data to foreign governments, foreign contractors, or international...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... disclose technical data for which restrictions on use, release, or disclosure have been asserted to foreign..., modification, reproduction, release, performance, display, or disclosure of such data have been satisfied. ... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Providing technical data...

  4. 48 CFR 227.7103-16 - Providing technical data to foreign governments, foreign contractors, or international...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... disclose technical data for which restrictions on use, release, or disclosure have been asserted to foreign..., modification, reproduction, release, performance, display, or disclosure of such data have been satisfied. ... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Providing technical data...

  5. 48 CFR 17.605 - Award, renewal, and extension.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Award, renewal, and extension. (a) Effective work performance under management and operating contracts... prospective contractor's technical and managerial capacity are sufficient, that organizational conflicts of... rights to involve itself, if necessary, in technical and managerial decisionmaking concerning performance...

  6. Regulatory and technical reports (abstract index journal): Annual compilation for 1996, Volume 21, No. 4

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sheehan, M.A.

    1997-04-01

    This compilation is the annual cumulation of bibliographic data and abstracts for the formal regulatory and technical reports issued by the U.S. Nuclear Regulatory Commission (NRC) Staff and its contractors.

  7. Technical paper contest for women 1992. Space challenges: Earth and beyond

    NASA Technical Reports Server (NTRS)

    Orans, Robin (Editor)

    1993-01-01

    Two of the major concerns of the NASA Ames Research Center (NASA ARC) Advisory Committee for Women (ACW) are that recruitment of women scientists, engineers, and technicians needs to increase and that barriers to advancement need to be removed for improved representation of women in middle and upper management and scientific positions. One strategy that addressed this concern was the ACW sponsorship of a Technical Paper Contest for Women at Ames Research Center. Other sponsors of the Contest were the Ames Equal Opportunity Council and the Ames Contractor Council. The Technical Paper Contest for Women greatly increased the visibility of both the civil service women and the women who work for contractors at Ames. The women had the opportunity to hone their written and oral presentation skills. Networking among Ames women increased.

  8. International Earth Science Constellation Mission Operations Working Group September 27-29, 2016 Aqua Spring 2017 IAM Series

    NASA Technical Reports Server (NTRS)

    Good, Susan M.

    2016-01-01

    This Aqua Spring 2017 IAM Series powerpoint presentation will be presented at the MOWG meeting in Albuquerque, NM. Topics to be discussed are: recap Aqua 2016 IAM campaign maneuver results and post 2016 IAM MLT evolution; current DMU strategy; 2017 IAM campaign dates and planning; Aqua latest lifetime MLT team predictions. Susan Good is a contractor who supports David Tracewell in code 595 therefore this is being routed through 595. Eric Moyer, ESMO Deputy Project Manager-Technical has reviewed and approved this presentation.

  9. Scientific and technical information output of the Langley Research Center for Calender year 1981

    NASA Technical Reports Server (NTRS)

    1982-01-01

    Included are citations for formal reports, quick-release technical memorandums, contractor reports, journal articles and periodical literature, meeting/conference papers, and computer programs. Tech briefs, patents, and oral presentations to conferences/workshops are also included.

  10. Reflections on Centaur Upper Stage Integration by the NASA Lewis (Glenn) Research Center

    NASA Technical Reports Server (NTRS)

    Graham, Scott R.

    2015-01-01

    The NASA Glenn (then Lewis) Research Center (GRC) led several expendable launch vehicle (ELV) projects from 1963 to 1998, most notably the Centaur upper stage. These major, comprehensive projects included system management, system development, integration (both payload and stage), and launch operations. The integration role that GRC pioneered was truly unique and highly successful. Its philosophy, scope, and content were not just invaluable to the missions and vehicles it supported, but also had significant Agency-wide benefits. An overview of the NASA Lewis Research Center (now the NASA Glenn Research Center) philosophy on ELV integration is provided, focusing on Atlas/Centaur, Titan/Centaur, and Shuttle/Centaur vehicles and programs. The necessity of having a stable, highly technically competent in-house staff is discussed. Significant depth of technical penetration of contractor work is another critical component. Functioning as a cohesive team was more than a concept: GRC senior management, NASA Headquarters, contractors, payload users, and all staff worked together. The scope, content, and history of launch vehicle integration at GRC are broadly discussed. Payload integration is compared to stage development integration in terms of engineering and organization. Finally, the transition from buying launch vehicles to buying launch services is discussed, and thoughts on future possibilities of employing the successful GRC experience in integrating ELV systems like Centaur are explored.

  11. Reflections on Centaur Upper Stage Integration by the NASA Lewis (Glenn) Research Center

    NASA Technical Reports Server (NTRS)

    Graham, Scott R.

    2014-01-01

    The NASA Glenn (then Lewis) Research Center (GRC) led several expendable launch vehicle (ELV) projects from 1963 to 1998, most notably the Centaur upper stage. These major, comprehensive projects included system management, system development, integration (both payload and stage), and launch operations. The integration role that GRC pioneered was truly unique and highly successful. Its philosophy, scope, and content were not just invaluable to the missions and vehicles it supported, but also had significant Agencywide benefits. An overview of the NASA Lewis Research Center (now the NASA Glenn Research Center) philosophy on ELV integration is provided, focusing on Atlas/Centaur, Titan/Centaur, and Shuttle/Centaur vehicles and programs. The necessity of having a stable, highly technically competent in-house staff is discussed. Significant depth of technical penetration of contractor work is another critical component. Functioning as a cohesive team was more than a concept: GRC senior management, NASA Headquarters, contractors, payload users, and all staff worked together. The scope, content, and history of launch vehicle integration at GRC are broadly discussed. Payload integration is compared to stage development integration in terms of engineering and organization. Finally, the transition from buying launch vehicles to buying launch services is discussed, and thoughts on future possibilities of employing the successful GRC experience in integrating ELV systems like Centaur are explored.

  12. FY 1995 Scientific and Technical Reports, Articles, Papers, and Presentations, Volume 1

    NASA Technical Reports Server (NTRS)

    Turner, Joyce E. (Compiler)

    1995-01-01

    This document presents formal NASA technical reports, papers published in technical journals, and presentations by MSFC personnel in FY95. It also includes papers of MSFC contractors. The information in this report may be of value to the scientific and engineering community in determining what information has been published and what is available.

  13. Scientific and technical information output of the Langley Research Center for calendar year 1980

    NASA Technical Reports Server (NTRS)

    1981-01-01

    This document is a compilation of the scientific and technical information that the Langley Research Center has produced during the calendar year 1980. Approximately 1400 citations are given. Formal reports, quick-release technical memorandums, contractor reports, journal articles, meeting/conference papers, computer programs, tech briefs, patents, and unpublished research are included.

  14. Scientific and technical information output of the Langley Research Center for calendar year 1986

    NASA Technical Reports Server (NTRS)

    1987-01-01

    This document is a compilation of the scientific and technical information that the Langley Research Center has produced during the calendar year 1986. Included are citations for Formal Reports, Quick-Release Technical Memorandums, Contractor Reports, Journal Articles and Other Publications, Meeting Presentations, Techncial Talks, Computer Programs, Tech Briefs, and Patents.

  15. "Launch Your Business with NASA" conference in Decatur, Alabama.

    NASA Image and Video Library

    2017-10-18

    The Morgan County Economic Development Association and the City of Decatur, in Partnership with the NASA/Marshall Space Flight Center (MSFC), hosted a business forum on, How to Launch Your Business with NASA, Wednesday, October 18, 2017, at the Alabama Center for the Arts in downtown Decatur, AL. The event was open to all businesses allowed them to connect with Senior NASA representatives and their prime contractors. The program guided businesses through the process of working with NASA as a supplier, subcontractor, and/or a service provider. The Marshall Space Flight Center’s projected procurement budget in FY 2018 is approximately $2.2 billion and numerous procurement opportunities are available for small business participation each fiscal year. The program included Todd May, Director of Marshall Space Flight Center; Johnny Stephenson, Director of Marshall Space Flight Center’s Office of Strategic Analysis and Communication; David Brock, Small Business Specialist with Marshall Space Flight Center; and Lynn Garrison, Small Business Specialist Technical Advisor with Marshall Space Flight Center. Additionally, there was a prime contractor panel consisting of representatives from five NASA prime contractors. The event included a dedicated networking session with those prime contractors. The “Launch Your Business With NASA” event provides those in attendance the opportunity to network with key Marshall Space Flight Center procurement and technical personnel, and representatives of several major Marshall Space Flight Center prime contractors.Arts.

  16. "Launch Your Business with NASA" conference in Decatur, Alabama.

    NASA Image and Video Library

    2017-10-18

    The Morgan County Economic Development Association and the City of Decatur, in Partnership with the NASA/Marshall Space Flight Center (MSFC), hosted a business forum on, How to Launch Your Business with NASA, Wednesday, October 18, 2017, at the Alabama Center for the Arts in downtown Decatur, AL. The event was open to all businesses allowed them to connect with Senior NASA representatives and their prime contractors. The program guided businesses through the process of working with NASA as a supplier, subcontractor, and/or a service provider. The Marshall Space Flight Center’s projected procurement budget in FY 2018 is approximately $2.2 billion and numerous procurement opportunities are available for small business participation each fiscal year. The program included Todd May, Director of Marshall Space Flight Center; Johnny Stephenson, Director of Marshall Space Flight Center’s Office of Strategic Analysis and Communication; David Brock, Small Business Specialist with Marshall Space Flight Center; and Lynn Garrison, Small Business Specialist Technical Advisor with Marshall Space Flight Center. Additionally, there was a prime contractor panel consisting of representatives from five NASA prime contractors. The event included a dedicated networking session with those prime contractors. The “Launch Your Business With NASA” event provides those in attendance the opportunity to network with key Marshall Space Flight Center procurement and technical personnel, and representatives of several major Marshall Space Flight Center prime contractors. Decatur Mayor Tab Bowling greets David Brock.

  17. "Launch Your Business with NASA" conference in Decatur, Alabama.

    NASA Image and Video Library

    2017-10-18

    The Morgan County Economic Development Association and the City of Decatur, in Partnership with the NASA/Marshall Space Flight Center (MSFC), hosted a business forum on, How to Launch Your Business with NASA, Wednesday, October 18, 2017, at the Alabama Center for the Arts in downtown Decatur, AL. The event was open to all businesses allowed them to connect with Senior NASA representatives and their prime contractors. The program guided businesses through the process of working with NASA as a supplier, subcontractor, and/or a service provider. The Marshall Space Flight Center’s projected procurement budget in FY 2018 is approximately $2.2 billion and numerous procurement opportunities are available for small business participation each fiscal year. The program included Todd May, Director of Marshall Space Flight Center; Johnny Stephenson, Director of Marshall Space Flight Center’s Office of Strategic Analysis and Communication; David Brock, Small Business Specialist with Marshall Space Flight Center; and Lynn Garrison, Small Business Specialist Technical Advisor with Marshall Space Flight Center. Additionally, there was a prime contractor panel consisting of representatives from five NASA prime contractors. The event included a dedicated networking session with those prime contractors. The “Launch Your Business With NASA” event provides those in attendance the opportunity to network with key Marshall Space Flight Center procurement and technical personnel, and representatives of several major Marshall Space Flight Center prime contractors.Arts. MSFC Director Todd May shares opening remarks.

  18. "Launch Your Business with NASA" conference in Decatur, Alabama.

    NASA Image and Video Library

    2017-10-18

    The Morgan County Economic Development Association and the City of Decatur, in Partnership with the NASA/Marshall Space Flight Center (MSFC), hosted a business forum on, How to Launch Your Business with NASA, Wednesday, October 18, 2017, at the Alabama Center for the Arts in downtown Decatur, AL. The event was open to all businesses allowed them to connect with Senior NASA representatives and their prime contractors. The program guided businesses through the process of working with NASA as a supplier, subcontractor, and/or a service provider. The Marshall Space Flight Center’s projected procurement budget in FY 2018 is approximately $2.2 billion and numerous procurement opportunities are available for small business participation each fiscal year. The program included Todd May, Director of Marshall Space Flight Center; Johnny Stephenson, Director of Marshall Space Flight Center’s Office of Strategic Analysis and Communication; David Brock, Small Business Specialist with Marshall Space Flight Center; and Lynn Garrison, Small Business Specialist Technical Advisor with Marshall Space Flight Center. Additionally, there was a prime contractor panel consisting of representatives from five NASA prime contractors. The event included a dedicated networking session with those prime contractors. The “Launch Your Business With NASA” event provides those in attendance the opportunity to network with key Marshall Space Flight Center procurement and technical personnel, and representatives of several major Marshall Space Flight Center prime contractors.Arts.. Decatur Mayor Tab Bowling welcomes attendees.

  19. Fiscal year 1977 scientific and technical reports, articles, papers, and presentations

    NASA Technical Reports Server (NTRS)

    White, O. L. (Compiler)

    1977-01-01

    This bibliography lists 78 NASA technical memoranda, notes, papers, and reports presented by Marshall Space Flight Center personnel in FY 1977. In addition, 525 papers by contractors to that facility are cited along with 129 papers cleared for presentation.

  20. Waste isolation safety assessment program. Task 4. Third contractor information meeting

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1980-06-01

    The Contractor Information Meeting (October 14 to 17, 1979) was part of the FY-1979 effort of Task 4 of the Waste Isolation Safety Assessment Program (WISAP): Sorption/Desorption Analysis. The objectives of this task are to: evaluate sorption/desorption measurement methods and develop a standardized measurement procedure; produce a generic data bank of nuclide-geologic interactions using a wide variety of geologic media and groundwaters; perform statistical analysis and synthesis of these data; perform validation studies to compare short-term laboratory studies to long-term in situ behavior; develop a fundamental understanding of sorption/desorption processes; produce x-ray and gamma-emitting isotopes suitable for the study ofmore » actinides at tracer concentrations; disseminate resulting information to the international technical community; and provide input data support for repository safety assessment. Conference participants included those subcontracted to WISAP Task 4, representatives and independent subcontractors to the Office of Nuclear Waste Isolation, representatives from other waste disposal programs, and experts in the area of waste/geologic media interaction. Since the meeting, WISAP has been divided into two programs: Assessment of Effectiveness of Geologic Isolation Systems (AEGIS) (modeling efforts) and Waste/Rock Interactions Technology (WRIT) (experimental work). The WRIT program encompasses the work conducted under Task 4. This report contains the information presented at the Task 4, Third Contractor Information Meeting. Technical Reports from the subcontractors, as well as Pacific Northwest Laboratory (PNL), are provided along with transcripts of the question-and-answer sessions. The agenda and abstracts of the presentations are also included. Appendix A is a list of the participants. Appendix B gives an overview of the WRIT program and details the WRIT work breakdown structure for 1980.« less

  1. FY 1994 scientific and technical reports, articles, papers, and presentations

    NASA Technical Reports Server (NTRS)

    Turner, Joyce E. (Compiler)

    1994-01-01

    This document presents formal NASA technical reports, papers published in technical journals, and presentations by Marshall Space Flight Center personnel in FY94. It also includes papers of MSFC contractors and author indexes. The information in this report may be of value to the scientific and engineering community in determining what information has been published and what is available.

  2. Overview of NASA Langley's Systems Analysis Capabilities

    NASA Technical Reports Server (NTRS)

    Cavanaugh, Stephen; Kumar, Ajay; Brewer, Laura; Kimmel, Bill; Korte, John; Moul, Tom

    2006-01-01

    The Systems Analysis and Concepts Directorate (SACD) has been in the systems analysis business line supporting National Aeronautics and Space Administration (NASA) aeronautics, exploration, space operations and science since the 1960 s. Our current organization structure is shown in Figure 1. SACD mission can be summed up in the following statements: 1. We conduct advanced concepts for Agency decision makers and programs. 2. We provide aerospace systems analysis products such as mission architectures, advanced system concepts, system and technology trades, life cycle cost and risk analysis, system integration and pre-decisional sensitive information. 3. Our work enables informed technical, programmatic and budgetary decisions. SACD has a complement of 114 government employees and approximately 50 on-site contractors which is equally split between supporting aeronautics and exploration. SACD strives for technical excellence and creditability of the systems analysis products delivered to its customers. The Directorate office is continuously building market intelligence and working with other NASA centers and external partners to expand our business base. The Branches strive for technical excellence and credibility of our systems analysis products by seeking out existing and new partnerships that are critical for successful systems analysis. The Directorates long term goal is to grow the amount of science systems analysis business base.

  3. FY 2001 Scientific and Technical Reports, Articles, Papers, and Presentations

    NASA Technical Reports Server (NTRS)

    Waits, J. E. Turner (Compiler)

    2002-01-01

    This Technical Memorandum (TM) presents formal NASA technical reports, papers published in technical journals, and presentations by MSFC personnel in FY 2001. It also includes papers of MSFC contractors. After being announced in STAR, all NASA series reports may be obtained from the National Technical Information Service, 5285 Port Royal Road, Springfield, VA 22161. The information in this TM may be of value to the scientific and engineering community in determining what information has been published and what is available.

  4. FY 2004 Scientific and Technical Reports, Articles, Papers, and Presentations

    NASA Technical Reports Server (NTRS)

    Fowler, B. A. (Compiler)

    2006-01-01

    This Technical Memorandum (TM) presents formal NASA technical reports, papers published in technical journals, and presentations by Marshall Space Flight Center (MSFC) personnel FY 2004. It also includes papers of MSFC contractors. After being announced in STAR, all NASA series reports may be obtained from the National Technical Information Service, 5285 Port Royal Road, Springfield, VA 22161. The information in this TM maybe of value to the scientific and engineering community in determining what information has been published and what is available.

  5. FY 2003 Scientific and Technical Reports, Articles, Papers, and Presentations

    NASA Technical Reports Server (NTRS)

    Fowler, B. A. (Compiler)

    2004-01-01

    This Technical Memorandum (TM) presents formal NASA technical reports, papers published in technical journals, and presentations by Marshall Space Flight Center (MSFC) personnel in FY 2003. It also includes papers of MSFC contractors. After being announced in STAR, all NASA series reports may be obtained from the National Technical Information Service, 5285 Port Royal Road, Spring.eld, VA 22161. The information in this TM may be of value to the scientific and engineering community in determining what information has been published and what is available.

  6. The 1994 Ames Research Center publications: A bibliography

    NASA Technical Reports Server (NTRS)

    Scarich, Shelley J. (Editor)

    1995-01-01

    This document is a compilation of the scientific and technical information that Ames Research Center has produced during the calendar year 1994. Included are citations for formal reports, high-number conference publications, high-number technical memorandums, contractor reports, journal articles, meeting presentation, tech briefs, patents, and translations.

  7. Risk Analysis of Return Support Material on Gas Compressor Platform Project

    NASA Astrophysics Data System (ADS)

    Silvianita; Aulia, B. U.; Khakim, M. L. N.; Rosyid, Daniel M.

    2017-07-01

    On a fixed platforms project are not only carried out by a contractor, but two or more contractors. Cooperation in the construction of fixed platforms is often not according to plan, it is caused by several factors. It takes a good synergy between the contractor to avoid miss communication may cause problems on the project. For the example is about support material (sea fastening, skid shoe and shipping support) used in the process of sending a jacket structure to operation place often does not return to the contractor. It needs a systematic method to overcome the problem of support material. This paper analyses the causes and effects of GAS Compressor Platform that support material is not return, using Fault Tree Analysis (FTA) and Event Tree Analysis (ETA). From fault tree analysis, the probability of top event is 0.7783. From event tree analysis diagram, the contractors lose Rp.350.000.000, - to Rp.10.000.000.000, -.

  8. Range Flight Safety Requirements

    NASA Technical Reports Server (NTRS)

    Loftin, Charles E.; Hudson, Sandra M.

    2018-01-01

    The purpose of this NASA Technical Standard is to provide the technical requirements for the NPR 8715.5, Range Flight Safety Program, in regards to protection of the public, the NASA workforce, and property as it pertains to risk analysis, Flight Safety Systems (FSS), and range flight operations. This standard is approved for use by NASA Headquarters and NASA Centers, including Component Facilities and Technical and Service Support Centers, and may be cited in contract, program, and other Agency documents as a technical requirement. This standard may also apply to the Jet Propulsion Laboratory or to other contractors, grant recipients, or parties to agreements to the extent specified or referenced in their contracts, grants, or agreements, when these organizations conduct or participate in missions that involve range flight operations as defined by NPR 8715.5.1.2.2 In this standard, all mandatory actions (i.e., requirements) are denoted by statements containing the term “shall.”1.3 TailoringTailoring of this standard for application to a specific program or project shall be formally documented as part of program or project requirements and approved by the responsible Technical Authority in accordance with NPR 8715.3, NASA General Safety Program Requirements.

  9. Integrated Evaluation of Closed Loop Air Revitalization System Components

    NASA Technical Reports Server (NTRS)

    Murdock, K.

    2010-01-01

    NASA s vision and mission statements include an emphasis on human exploration of space, which requires environmental control and life support technologies. This Contractor Report (CR) describes the development and evaluation of an Air Revitalization System, modeling and simulation of the components, and integrated hardware testing with the goal of better understanding the inherent capabilities and limitations of this closed loop system. Major components integrated and tested included a 4-Bed Modular Sieve, Mechanical Compressor Engineering Development Unit, Temperature Swing Adsorption Compressor, and a Sabatier Engineering and Development Unit. The requisite methodolgy and technical results are contained in this CR.

  10. David Brock addresses the "How to Launch Your Business with NASA" forum.

    NASA Image and Video Library

    2017-10-18

    The Morgan County Economic Development Association and the City of Decatur, in Partnership with the NASA/Marshall Space Flight Center (MSFC), hosted a business forum on, How to Launch Your Business with NASA, Wednesday, October 18, 2017, at the Alabama Center for the Arts in downtown Decatur, AL. The event was open to all businesses allowed them to connect with Senior NASA representatives and their prime contractors. The program guided businesses through the process of working with NASA as a supplier, subcontractor, and/or a service provider. The Marshall Space Flight Center’s projected procurement budget in FY 2018 is approximately $2.2 billion and numerous procurement opportunities are available for small business participation each fiscal year. The program included Todd May, Director of Marshall Space Flight Center; Johnny Stephenson, Director of Marshall Space Flight Center’s Office of Strategic Analysis and Communication; David Brock, Small Business Specialist with Marshall Space Flight Center; and Lynn Garrison, Small Business Specialist Technical Advisor with Marshall Space Flight Center. Additionally, there was a prime contractor panel consisting of representatives from five NASA prime contractors. The event included a dedicated networking session with those prime contractors. The “Launch Your Business With NASA” event provides those in attendance the opportunity to network with key Marshall Space Flight Center procurement and technical personnel, and representatives of several major Marshall Space Flight Center prime contractors.Arts.. David Brock, head of Marshall's Small Business Office talks about doing business with Marshall.

  11. "Launch Your Business with NASA" conference in Decatur, Alabama.

    NASA Image and Video Library

    2017-10-18

    The Morgan County Economic Development Association and the City of Decatur, in Partnership with the NASA/Marshall Space Flight Center (MSFC), hosted a business forum on, How to Launch Your Business with NASA, Wednesday, October 18, 2017, at the Alabama Center for the Arts in downtown Decatur, AL. The event was open to all businesses allowed them to connect with Senior NASA representatives and their prime contractors. The program guided businesses through the process of working with NASA as a supplier, subcontractor, and/or a service provider. The Marshall Space Flight Center’s projected procurement budget in FY 2018 is approximately $2.2 billion and numerous procurement opportunities are available for small business participation each fiscal year. The program included Todd May, Director of Marshall Space Flight Center; Johnny Stephenson, Director of Marshall Space Flight Center’s Office of Strategic Analysis and Communication; David Brock, Small Business Specialist with Marshall Space Flight Center; and Lynn Garrison, Small Business Specialist Technical Advisor with Marshall Space Flight Center. Additionally, there was a prime contractor panel consisting of representatives from five NASA prime contractors. The event included a dedicated networking session with those prime contractors. The “Launch Your Business With NASA” event provides those in attendance the opportunity to network with key Marshall Space Flight Center procurement and technical personnel, and representatives of several major Marshall Space Flight Center prime contractors.Arts. MSFC Director Todd May and Decatur Mayor Tab Bowling enjoy a light moment.

  12. "Launch Your Business with NASA" conference in Decatur, Alabama.

    NASA Image and Video Library

    2017-10-18

    The Morgan County Economic Development Association and the City of Decatur, in Partnership with the NASA/Marshall Space Flight Center (MSFC), hosted a business forum on, How to Launch Your Business with NASA, Wednesday, October 18, 2017, at the Alabama Center for the Arts in downtown Decatur, AL. The event was open to all businesses allowed them to connect with Senior NASA representatives and their prime contractors. The program guided businesses through the process of working with NASA as a supplier, subcontractor, and/or a service provider. The Marshall Space Flight Center’s projected procurement budget in FY 2018 is approximately $2.2 billion and numerous procurement opportunities are available for small business participation each fiscal year. The program included Todd May, Director of Marshall Space Flight Center; Johnny Stephenson, Director of Marshall Space Flight Center’s Office of Strategic Analysis and Communication; David Brock, Small Business Specialist with Marshall Space Flight Center; and Lynn Garrison, Small Business Specialist Technical Advisor with Marshall Space Flight Center. Additionally, there was a prime contractor panel consisting of representatives from five NASA prime contractors. The event included a dedicated networking session with those prime contractors. The “Launch Your Business With NASA” event provides those in attendance the opportunity to network with key Marshall Space Flight Center procurement and technical personnel, and representatives of several major Marshall Space Flight Center prime contractors.Arts.. OSAC Director Johnny Stephenson talks about Marshall's Mission areas to audience

  13. "Launch Your Business with NASA" conference in Decatur, Alabama.

    NASA Image and Video Library

    2017-10-18

    The Morgan County Economic Development Association and the City of Decatur, in Partnership with the NASA/Marshall Space Flight Center (MSFC), hosted a business forum on, How to Launch Your Business with NASA, Wednesday, October 18, 2017, at the Alabama Center for the Arts in downtown Decatur, AL. The event was open to all businesses allowed them to connect with Senior NASA representatives and their prime contractors. The program guided businesses through the process of working with NASA as a supplier, subcontractor, and/or a service provider. The Marshall Space Flight Center’s projected procurement budget in FY 2018 is approximately $2.2 billion and numerous procurement opportunities are available for small business participation each fiscal year. The program included Todd May, Director of Marshall Space Flight Center; Johnny Stephenson, Director of Marshall Space Flight Center’s Office of Strategic Analysis and Communication; David Brock, Small Business Specialist with Marshall Space Flight Center; and Lynn Garrison, Small Business Specialist Technical Advisor with Marshall Space Flight Center. Additionally, there was a prime contractor panel consisting of representatives from five NASA prime contractors. The event included a dedicated networking session with those prime contractors. The “Launch Your Business With NASA” event provides those in attendance the opportunity to network with key Marshall Space Flight Center procurement and technical personnel, and representatives of several major Marshall Space Flight Center prime contractors. Decatur Mayor Tab Bowling chats with NASA retiree Don Odum

  14. "Launch Your Business with NASA" conference in Decatur, Alabama.

    NASA Image and Video Library

    2017-10-18

    The Morgan County Economic Development Association and the City of Decatur, in Partnership with the NASA/Marshall Space Flight Center (MSFC), hosted a business forum on, How to Launch Your Business with NASA, Wednesday, October 18, 2017, at the Alabama Center for the Arts in downtown Decatur, AL. The event was open to all businesses allowed them to connect with Senior NASA representatives and their prime contractors. The program guided businesses through the process of working with NASA as a supplier, subcontractor, and/or a service provider. The Marshall Space Flight Center’s projected procurement budget in FY 2018 is approximately $2.2 billion and numerous procurement opportunities are available for small business participation each fiscal year. The program included Todd May, Director of Marshall Space Flight Center; Johnny Stephenson, Director of Marshall Space Flight Center’s Office of Strategic Analysis and Communication; David Brock, Small Business Specialist with Marshall Space Flight Center; and Lynn Garrison, Small Business Specialist Technical Advisor with Marshall Space Flight Center. Additionally, there was a prime contractor panel consisting of representatives from five NASA prime contractors. The event included a dedicated networking session with those prime contractors. The “Launch Your Business With NASA” event provides those in attendance the opportunity to network with key Marshall Space Flight Center procurement and technical personnel, and representatives of several major Marshall Space Flight Center prime contractors.Arts.. City of Hartselle Mayor Randy Garrison welcomes attendees to conference.

  15. 40 CFR 35.4235 - Are there specific provisions my group's contract(s) must contain?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Technical Assistance Procuring A Technical Advisor Or Other Contractor with Tag Funds § 35.4235 Are there specific... progress reports; (3) Expenditures; and (4) Commitments indicating their relationship to established costs...

  16. 76 FR 11414 - Defense Federal Acquisition Regulation Supplement; Independent Research and Development Technical...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-02

    ... Acquisition Regulation Supplement; Independent Research and Development Technical Descriptions (DFARS Case... (DFARS) to require contractors to report independent research and development (IR&D) projects generating... the address shown below on or before May 2, 2011, to be considered in the formation of the final rule...

  17. FY 1978 scientific and technical reports, articles, papers, and presentations. [bibliography

    NASA Technical Reports Server (NTRS)

    White, O. L. (Compiler)

    1978-01-01

    Abstracts of 73 technical papers published or presented by MSFC personnel in FY-78 are presented. In addition, over 400 papers by contractors to that facility are listed along with the STAR document number for each report. Titles of 208 additional papers already cleared for publication are included.

  18. 37 CFR 401.13 - Administration of patent rights clauses.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... in government or other publications of technical reports of contractors or others. In recognition of... invention to the extent such materials were provided as part of a technical report or other submission of... disclosure, patent applications, and utilization reports required in performance or in consequence of awards...

  19. 37 CFR 401.13 - Administration of patent rights clauses.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... in government or other publications of technical reports of contractors or others. In recognition of... invention to the extent such materials were provided as part of a technical report or other submission of... disclosure, patent applications, and utilization reports required in performance or in consequence of awards...

  20. 37 CFR 401.13 - Administration of patent rights clauses.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... in government or other publications of technical reports of contractors or others. In recognition of... invention to the extent such materials were provided as part of a technical report or other submission of... disclosure, patent applications, and utilization reports required in performance or in consequence of awards...

  1. 37 CFR 401.13 - Administration of patent rights clauses.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... in government or other publications of technical reports of contractors or others. In recognition of... invention to the extent such materials were provided as part of a technical report or other submission of... disclosure, patent applications, and utilization reports required in performance or in consequence of awards...

  2. 48 CFR 227.7103-15 - Subcontractor rights in technical data.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... clauses at 252.227-7013, Rights in Technical Data—Noncommercial Items, and 252.227-7037, Validation of... subcontractor to transact directly with the Government matters relating to the validation of its asserted... contractor's agreement that the direct transaction of validation or challenge matters with subcontractors at...

  3. 48 CFR 1852.225-70 - Export Licenses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... licenses or other approvals, if required, for exports of hardware, technical data, and software, or for the... will have access to export-controlled technical data or software. (c) The Contractor shall be... software) pursuant to the exemption at 22 CFR 125.4(b)(3). The Contracting Officer or designated...

  4. 48 CFR 252.227-7015 - Technical data-Commercial items.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...) under a contract, the primary purpose of which is to furnish independent and impartial advice or... Government-Furnished Information Marked with Restrictive Legends. (3) Form, fit, and function data means..., fit, and function data; (iii) Are a correction or change to technical data furnished to the Contractor...

  5. 48 CFR 227.7103-15 - Subcontractor rights in technical data.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... clauses at 252.227-7013, Rights in Technical Data—Noncommercial Items, and 252.227-7037, Validation of... subcontractor to transact directly with the Government matters relating to the validation of its asserted... contractor's agreement that the direct transaction of validation or challenge matters with subcontractors at...

  6. 48 CFR 227.7103-15 - Subcontractor rights in technical data.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... clauses at 252.227-7013, Rights in Technical Data—Noncommercial Items, and 252.227-7037, Validation of... subcontractor to transact directly with the Government matters relating to the validation of its asserted... contractor's agreement that the direct transaction of validation or challenge matters with subcontractors at...

  7. 48 CFR 227.7103-15 - Subcontractor rights in technical data.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... clauses at 252.227-7013, Rights in Technical Data—Noncommercial Items, and 252.227-7037, Validation of... subcontractor to transact directly with the Government matters relating to the validation of its asserted... contractor's agreement that the direct transaction of validation or challenge matters with subcontractors at...

  8. 48 CFR 227.7103-15 - Subcontractor rights in technical data.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... clauses at 252.227-7013, Rights in Technical Data—Noncommercial Items, and 252.227-7037, Validation of... subcontractor to transact directly with the Government matters relating to the validation of its asserted... contractor's agreement that the direct transaction of validation or challenge matters with subcontractors at...

  9. FY 1990 scientific and technical reports, articles, papers, and presentations

    NASA Technical Reports Server (NTRS)

    Turner, Joyce E. (Compiler)

    1990-01-01

    Formal NASA technical reports, papers published in technical journals, and presentations by MSFC personnel in FY 90 are presented. Also included are papers of MSFC contractors. After being announced in STAR, all of the NASA series reports may be obtained from NTIS. The information may be of value to the scientific and engineering community in determining what information has been published and what is available.

  10. 48 CFR 45.501 - Prime contractor alternate locations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Prime contractor alternate... CONTRACT MANAGEMENT GOVERNMENT PROPERTY Support Government Property Administration 45.501 Prime contractor... administration from another contract administration office, for purposes of evaluating prime contractor...

  11. Scientific and Technical Reports, Articles, Papers, and Presentations

    NASA Technical Reports Server (NTRS)

    Waits, J. E. Turner (Compiler)

    2001-01-01

    This document presents formal NASA technical reports, papers published in technical journals, and presentations by MSFC personnel in FY 2000. It also includes papers of MSFC contractors. After being announced in STAR, all the NASA series reports may be obtained from the National Technical Information Service, 5285 Port Royal Road, Springfield, VA 22161. The information in this report may be of value to the scientific and engineering community in determining what information has been published and what is available.

  12. FY 1998 Scientific and Technical Reports, Articles, Papers, and Presentations

    NASA Technical Reports Server (NTRS)

    Waits, J. E. Turner (Compiler)

    1999-01-01

    This document presents formal NASA technical reports, papers published in technical journals, and presentations by MSFC (Marshall Space Flight Center) personnel in FY98. It also includes papers of MSFC contractors. After being announced in STAR, all of the NASA series reports may be obtained from the National Technical Information Service. The information in this report may be of value to the scientific and engineering community in determining what information has been published and what is available.

  13. DFAS Needs More Effective Controls Over Managing DoD Contractor Debt

    DTIC Science & Technology

    2011-07-15

    Acrobat fil e onl y) to audc lev@dod ig.m il. Copies of management comments must have the actual signature of the authori zing official for yo ur...Attribute Testing Results 18 E. Sampling Methodology 20 Glossary of Technical Terms 21 Management...Bill of Collection number to each contractor debt as a debt management tool. CDS allows users to prepare a demand letter from the database, post

  14. Trust in Teams Scale, Trust in Leaders Scale: Manual for Administration and Analyses

    DTIC Science & Technology

    2008-07-01

    Committee The scientific or technical validity of this Contractor Report is entirely the responsibility of the contractor and the...and Farley’s exploratory analysis of the unit climate profile. DRDC Toronto Report CR-2001-149. KORSGAARD, M . A., S. E. BRODT, & WHITENER, E. M ...8217 trust in leader, satisfaction, and organizational citizenship behaviors. Leadership Quarterly, 1(2), 107-142. ROUSSEAU , D ., SITKIN, S., BURT, R

  15. The advantages of cost plus award fee contracts

    NASA Technical Reports Server (NTRS)

    Keathley, William C.

    1994-01-01

    A Cost Plus Award Fee contract is the best procurement vehicle for the high-tech, one-of-a-kind, development projects that constitute most of NASA'S projects. The use of this type of contract requires more government and contractor effort than any other forms of contracts. An award fee contract is described as an arrangement whereby the government periodically awards a fee consistent with the cost, schedule and technical performance that is achieved by a contractor during a preset period with preset award fee pools. It's the only contracting method where both the government and contractor goals are closely linked. It also has a built-in mechanism to conveniently alter and emphasize program events in order to current external and internal situations. The award fee process also demands good communication between government and contractor participants.

  16. Overseas Contingency Operations: Observations on the Use of Force Management Levels in Afghanistan, Iraq, and Syria

    DTIC Science & Technology

    2016-12-01

    relating to security force assistance activities and readiness of U.S. Special Operations Forces. • Increased Use of Contractors and Personnel on...Temporary Duty. DOD relies on contractors to support a wide range of military operations and free up uniformed personnel to directly support mission...needs. During operations in Afghanistan and Iraq contractor personnel played a critical role in supporting U.S. troops and sometimes exceeded the

  17. Department of the Air Force Information Technology Program FY 95 President’s Budget

    DTIC Science & Technology

    1994-03-01

    2095 2200 552 900 1032 Description: Contractor hardware maintenan support, systems analyst support software development and maintenance, and off -the...hardware maintenance support, systems analyst support, operations support, configuration management, test support, and off -the-shelf software license...2419 2505 2594 Description: Contractor hardware maintenance support, systems analyst support, operations support, and off -the-shelf software license

  18. Contingency Contractor Optimization Phase 3 Sustainment Software Design Document - Contingency Contractor Optimization Tool - Prototype

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Durfee, Justin David; Frazier, Christopher Rawls; Bandlow, Alisa

    This document describes the final software design of the Contingency Contractor Optimization Tool - Prototype. Its purpose is to provide the overall architecture of the software and the logic behind this architecture. Documentation for the individual classes is provided in the application Javadoc. The Contingency Contractor Optimization project is intended to address Department of Defense mandates by delivering a centralized strategic planning tool that allows senior decision makers to quickly and accurately assess the impacts, risks, and mitigation strategies associated with utilizing contract support. The Contingency Contractor Optimization Tool - Prototype was developed in Phase 3 of the OSD ATLmore » Contingency Contractor Optimization project to support strategic planning for contingency contractors. The planning tool uses a model to optimize the Total Force mix by minimizing the combined total costs for selected mission scenarios. The model optimizes the match of personnel types (military, DoD civilian, and contractors) and capabilities to meet mission requirements as effectively as possible, based on risk, cost, and other requirements.« less

  19. 7 CFR 550.46 - Competition.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... performance, financial and technical resources or accessibility to other necessary resources. In certain... eliminate competition or otherwise restrain trade. In order to ensure objective contractor performance and...

  20. 48 CFR 742.1170-1 - General.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... MANAGEMENT CONTRACT ADMINISTRATION Production, Surveillance, and Reporting 742.1170-1 General. Performance... cognizant technical officer, to maintain adequate knowledge of the contractor's activities and progress in...

  1. 48 CFR 742.1170-1 - General.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... MANAGEMENT CONTRACT ADMINISTRATION Production, Surveillance, and Reporting 742.1170-1 General. Performance... cognizant technical officer, to maintain adequate knowledge of the contractor's activities and progress in...

  2. 48 CFR 742.1170-1 - General.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... MANAGEMENT CONTRACT ADMINISTRATION Production, Surveillance, and Reporting 742.1170-1 General. Performance... cognizant technical officer, to maintain adequate knowledge of the contractor's activities and progress in...

  3. 48 CFR 9.502 - Applicability.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... subpart applies to contracts with either profit or nonprofit organizations, including nonprofit... engineering and technical direction work performed by a contractor that does not have overall contractual...

  4. 48 CFR 742.1170-1 - General.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... MANAGEMENT CONTRACT ADMINISTRATION Production, Surveillance, and Reporting 742.1170-1 General. Performance... cognizant technical officer, to maintain adequate knowledge of the contractor's activities and progress in...

  5. 48 CFR 252.227-7025 - Limitations on the use or disclosure of government-furnished information marked with restrictive...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Software and Noncommercial Computer Software Documentation clause of this contract. (3) For Small Business... Rights in Noncommercial Technical Data and Computer Software—Small Business Innovative Research (SBIR) Program clause of this contract. (b) Technical data or computer software provided to the Contractor as...

  6. 48 CFR 452.215-71 - Instructions for the Preparation of Technical and Business Proposals.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... contained in the technical proposal so that the contractor's understanding of the statement of work may be... required if appropriate.) (2) Business Proposal. (a) Furnish financial statements for the last two years... specified in the statement of work. Any “alternate” proposal may be considered if overall performance would...

  7. The FY 1992 scientific and technical reports, articles, papers, and presentations

    NASA Technical Reports Server (NTRS)

    Turner, Joyce E. (Compiler)

    1992-01-01

    This document presents formal NASA technical reports, papers published in technical journals, and presentations by MSFC personnel in FY92. It also includes papers of MSFC contractors. After being announced in STAR, all of the NASA series reports may be obtained from the National Technical Information Service, 5285 Port Royal Road, Springfield, VA 22161. The information in this report may be of value to the scientific and engineering community in determining what information has been published and what is available.

  8. FY 1988 scientific and technical reports, articles, papers and presentations

    NASA Technical Reports Server (NTRS)

    Turner, Joyce E. (Compiler)

    1988-01-01

    This document presents formal NASA technical reports, papers published in technical journals, and presentations by MSFC personnel in FY 88. It also includes papers of MSFC contractors. After being announced in STAR, all of the NASA series reports may be obtained from the NationaL Technical Information Service, 5285 Port Royal Road, Springfield, VA 22161. The information in this report may be of value to the scientific and engineering community in determining what information has been published and what is available.

  9. FY87 scientific and technical reports, articles, papers, and presentations

    NASA Technical Reports Server (NTRS)

    Turner, Joyce E. (Compiler)

    1987-01-01

    The document presents formal NASA technical reports, papers published in technical journals, and presentations by MSFC personnel in FY87. It also includes papers of MSFC contractors. After being announced in STAR, all of the NASA series reports may be obtained from the National Technical Information Service, 5285 Port Royal Road, Springfield, Va. 22161. The information in this report may be of value to the scientific and engineering community in determining what information has been published and what is available.

  10. FY 1996 Scientific and Technical Reports, Articles, Papers, and Presentations. Volume 1

    NASA Technical Reports Server (NTRS)

    Turner-Waits, Joyce E. (Compiler)

    1996-01-01

    This document presents formal NASA technical reports, papers published in technical journals, and presentations by MSFC personnel in FY96. It also includes papers of MSFC contractors. After being announced in STAR, all of the NASA series reports may be obtained from the National Technical Information Service, 5285 Port Royal Road, Springfield, VA 22161. The information in this report may be of value to the scientific and engineering community in determining what information has been published and what is available.

  11. Fiscal year 1993 scientific and technical reports, articles, papers, and presentations

    NASA Technical Reports Server (NTRS)

    Turner, Joyce E. (Compiler)

    1993-01-01

    This document presents formal NASA technical reports, papers published in technical journals, and presentations by MSFC personnel in FY93. It also includes papers of MSFC contractors. After being announced in STAR, all of the NASA series reports may be obtained from the National Technical Information Service, 5285 Port Royal Road, Springfield, VA 22161. The information in this report may be of value to the scientific and engineering community in determining what information has been published and what is available.

  12. 40 CFR 35.6600 - Contractor claims.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contractor claims. 35.6600 Section 35... Actions Procurement Requirements Under A Cooperative Agreement § 35.6600 Contractor claims. (a) General... prepared by the contractor to support a claim against the recipient; and (4) The award official determines...

  13. 75 FR 60452 - Clean Water Act; Contractor Access to Confidential Business Information

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-30

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9208-9] Clean Water Act; Contractor Access to Confidential... electric industry to a new subcontractor of a contractor, Eastern Research Group (ERG). EPA previously... contractors and subcontractors to access information necessary to support EPA in the planning, development...

  14. Needs of Non-Energy Focused Contractors

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Liakus, C.

    2012-12-01

    To better understand the informational needs of non-energy focused contractors, including what information they need to motivate them to become energy-focused, the BARA team studied the type of information provided by the national programs, trade associations, and manufacturers that were researched for the related technical report: Effective Communication of Energy Efficiency. While that report focused on the delivery method, format, and strategy of the information, this study examines the content being put forward.

  15. Needs of Non Energy-Focused Contractors

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Liaukus, C.

    2012-12-01

    To better understand the informational needs of non energy-focused contractors, including what information they need to motivate them to become energy-focused, the BARA team studied the type of information provided by the national programs, trade associations, and manufacturers that were researched for the related technical report: Effective Communication of Energy Efficiency. While that report focused on the delivery method, format, and strategy of the information, this study examines the content being put forward.

  16. MV-22 Squadron Organization: A Different Way to Support

    DTIC Science & Technology

    2017-06-09

    acquisitions process, contractors have become an integral part in the support of daily MV-22...perform. MCAS New River has several teams of contract maintainers that are sent to individual squadrons on a daily basis.6 As the need for contractors ...has increased, more jobs have become available to qualified maintainers. This actually increases the need for even more contractors , as qualified

  17. Federal Energy Information Systems.

    ERIC Educational Resources Information Center

    Coyne, Joseph G.; Moneyhun, Dora H.

    1979-01-01

    Describes the Energy Information Administration (EIA) and the Technical Information Center (TIC), and lists databases accessible online to the Department of Energy and its contractors through DOE/RECON. (RAA)

  18. 48 CFR 252.235-7003 - Frequency authorization.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... characteristics of the proposed electromagnetic radiating device to the Contracting Officer during the initial... Contractor shall provide the technical operating characteristics of the proposed electromagnetic radiating...

  19. 48 CFR 204.7401 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Definitions. 204.7401... OF DEFENSE GENERAL ADMINISTRATIVE MATTERS Disclosure of information to litigation support contractors 204.7401 Definitions. “Litigation support,” “litigation support contractor,” and “sensitive...

  20. List of Contractors to Support Anthrax Remediation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Judd, Kathleen S.; Lesperance, Ann M.

    2010-05-14

    This document responds to a need identified by private sector businesses for information on contractors that may be qualified to support building remediation efforts following a wide-area anthrax release.

  1. 48 CFR 642.271 - Government Technical Monitor (GTM).

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT SERVICES Contract Administration Services 642.271 Government..., or because of special skills or knowledge necessary for monitoring the contractor's work. The...

  2. 48 CFR 642.271 - Government Technical Monitor (GTM).

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT SERVICES Contract Administration Services 642.271 Government..., or because of special skills or knowledge necessary for monitoring the contractor's work. The...

  3. 48 CFR 642.271 - Government Technical Monitor (GTM).

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT SERVICES Contract Administration Services 642.271 Government..., or because of special skills or knowledge necessary for monitoring the contractor's work. The...

  4. 48 CFR 17.605 - Award, renewal, and extension.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CONTRACTING METHODS AND CONTRACT TYPES SPECIAL CONTRACTING METHODS Management and Operating Contracts 17.605... prospective contractor's technical and managerial capacity are sufficient, that organizational conflicts of...

  5. Development of an Ada programming support environment database SEAD (Software Engineering and Ada Database) administration manual

    NASA Technical Reports Server (NTRS)

    Liaw, Morris; Evesson, Donna

    1988-01-01

    Software Engineering and Ada Database (SEAD) was developed to provide an information resource to NASA and NASA contractors with respect to Ada-based resources and activities which are available or underway either in NASA or elsewhere in the worldwide Ada community. The sharing of such information will reduce duplication of effort while improving quality in the development of future software systems. SEAD data is organized into five major areas: information regarding education and training resources which are relevant to the life cycle of Ada-based software engineering projects such as those in the Space Station program; research publications relevant to NASA projects such as the Space Station Program and conferences relating to Ada technology; the latest progress reports on Ada projects completed or in progress both within NASA and throughout the free world; Ada compilers and other commercial products that support Ada software development; and reusable Ada components generated both within NASA and from elsewhere in the free world. This classified listing of reusable components shall include descriptions of tools, libraries, and other components of interest to NASA. Sources for the data include technical newletters and periodicals, conference proceedings, the Ada Information Clearinghouse, product vendors, and project sponsors and contractors.

  6. 7 CFR 1944.407 - Limitations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... REGULATIONS (CONTINUED) HOUSING Self-Help Technical Assistance Grants § 1944.407 Limitations. The amount of... typical needed repairs, and the cost savings between self-help and contractor rehabilitation and repair...

  7. 20 CFR 435.44 - Procurement procedures.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... must be given to such matters as contractor integrity, record of past performance, financial and..., whenever practicable, of technical requirements in terms of functions to be performed or performance...

  8. Advanced Simulation and Computing Fiscal Year 2016 Implementation Plan, Version 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McCoy, M.; Archer, B.; Hendrickson, B.

    2015-08-27

    The Stockpile Stewardship Program (SSP) is an integrated technical program for maintaining the safety, surety, and reliability of the U.S. nuclear stockpile. The SSP uses nuclear test data, computational modeling and simulation, and experimental facilities to advance understanding of nuclear weapons. It includes stockpile surveillance, experimental research, development and engineering programs, and an appropriately scaled production capability to support stockpile requirements. This integrated national program requires the continued use of experimental facilities and programs, and the computational capabilities to support these programs. The purpose of this IP is to outline key work requirements to be performed and to control individualmore » work activities within the scope of work. Contractors may not deviate from this plan without a revised WA or subsequent IP.« less

  9. Test, Control and Monitor System (TCMS) operations plan

    NASA Technical Reports Server (NTRS)

    Macfarlane, C. K.; Conroy, M. P.

    1993-01-01

    The purpose is to provide a clear understanding of the Test, Control and Monitor System (TCMS) operating environment and to describe the method of operations for TCMS. TCMS is a complex and sophisticated checkout system focused on support of the Space Station Freedom Program (SSFP) and related activities. An understanding of the TCMS operating environment is provided and operational responsibilities are defined. NASA and the Payload Ground Operations Contractor (PGOC) will use it as a guide to manage the operation of the TCMS computer systems and associated networks and workstations. All TCMS operational functions are examined. Other plans and detailed operating procedures relating to an individual operational function are referenced within this plan. This plan augments existing Technical Support Management Directives (TSMD's), Standard Practices, and other management documentation which will be followed where applicable.

  10. 40 CFR 35.4210 - Must my group solicit and document bids for our procurements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Technical Assistance Procuring A Technical Advisor Or Other Contractor with Tag Funds § 35.4210 Must my group solicit and... the work; (ii) Provide potential sources in the scope of work to be performed and the criteria your...

  11. 49 CFR 19.44 - Procurement procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    .... Consideration shall be given to such matters as contractor integrity, record of past performance, financial and..., whenever practicable, of technical requirements in terms of functions to be performed or performance...

  12. 22 CFR 518.44 - Procurement procedures.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    .... Consideration shall be given to such matters as contractor integrity, record of past performance, financial and..., whenever practicable, of technical requirements in terms or functions to be performed or performance...

  13. 48 CFR 35.005 - Work statement.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... and creativity. Work statements must be individually tailored by technical and contracting personnel to attain the desired degree of flexibility for contractor creativity and the objectives of the R&D...

  14. 48 CFR 2035.70 - Contract clauses.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... insert the following clause in all solicitations and contracts for research and development by private contractors and universities and for other technical services, as appropriate: (1) Section 2052.235-70...

  15. 48 CFR 2035.70 - Contract clauses.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... insert the following clause in all solicitations and contracts for research and development by private contractors and universities and for other technical services, as appropriate: (1) Section 2052.235-70...

  16. 48 CFR 2035.70 - Contract clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... insert the following clause in all solicitations and contracts for research and development by private contractors and universities and for other technical services, as appropriate: (1) Section 2052.235-70...

  17. 48 CFR 2035.70 - Contract clauses.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... insert the following clause in all solicitations and contracts for research and development by private contractors and universities and for other technical services, as appropriate: (1) Section 2052.235-70...

  18. 48 CFR 35.005 - Work statement.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... and creativity. Work statements must be individually tailored by technical and contracting personnel to attain the desired degree of flexibility for contractor creativity and the objectives of the R&D...

  19. 48 CFR 35.005 - Work statement.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... and creativity. Work statements must be individually tailored by technical and contracting personnel to attain the desired degree of flexibility for contractor creativity and the objectives of the R&D...

  20. 48 CFR 35.005 - Work statement.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... and creativity. Work statements must be individually tailored by technical and contracting personnel to attain the desired degree of flexibility for contractor creativity and the objectives of the R&D...

  1. Cross-national research on contractor evaluation procedures in public works procurement

    NASA Astrophysics Data System (ADS)

    Kinoshita, Seiya; Sato, Naoyoshi; Matsumoto, Naoya

    Contractor evaluation methods in Japan's public works procurement, beginning with construction business licensure, going through biennial preliminary firm rating, up to project-by-project prequalification and comprehensive point rating, were developed during the period when public works were mostly procured through designated competitive bidding. It is essential to focus attention on contractor evaluation methods for introducing different types of procurement procedures which enhance the use of technological capabilities held by private businesses. An overall review of contractor evaluation procedures should be conducted in view of the present situation, where the open competitive bidding has become mainly used in combination with comprehensive evaluation, as well as to allow for further diversification of procurement methods. In Western countries, improvements have been made for the past several years in contractor evaluation procedures with more emphasis on "Value for Money." Advanced efforts made by these countries will be useful as a reference for overhauling Japan's contractor evaluation system. This study conducts a comparative review of contractor evaluation procedures for public procurement in Western countries such as the United States, the United Kingdom and France by identifying similarities and differences between those of Japan and the above mentioned countries. This reveals that a contractor's technical or professional ability is looked at separately from its economic and financial standing in those countries studied, and there is no case like Japan in which those two factors are integrated into one for evaluation.

  2. Battlefield Contractors: Operational Risk and System Support Contractors

    DTIC Science & Technology

    2010-10-27

    incentive for the use of contractors is the proven cost savings when compared to similarly trained active duty military forces. The Office of...no military or government civilian is trained to do. The reality is that “modern military operations now depend heavily on high-tech weapons systems...squadrons that rely exclusively on contracted line maintenance, with no military personnel trained to support the aircraft. Defense supplemental funds

  3. Space Station Freedom - Configuration management approach to supporting concurrent engineering and total quality management. [for NASA Space Station Freedom Program

    NASA Technical Reports Server (NTRS)

    Gavert, Raymond B.

    1990-01-01

    Some experiences of NASA configuration management in providing concurrent engineering support to the Space Station Freedom program for the achievement of life cycle benefits and total quality are discussed. Three change decision experiences involving tracing requirements and automated information systems of the electrical power system are described. The potential benefits of concurrent engineering and total quality management include improved operational effectiveness, reduced logistics and support requirements, prevention of schedule slippages, and life cycle cost savings. It is shown how configuration management can influence the benefits attained through disciplined approaches and innovations that compel consideration of all the technical elements of engineering and quality factors that apply to the program development, transition to operations and in operations. Configuration management experiences involving the Space Station program's tiered management structure, the work package contractors, international partners, and the participating NASA centers are discussed.

  4. 78 FR 21850 - Defense Federal Acquisition Regulation Supplement; Technical Amendments

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-12

    ... Parts 215, 235, and 237 Government procurement. Manuel Quinones, Editor, Defense Acquisition Regulations...-79 for notifying affected incumbent contractors of Government in-sourcing actions, in accordance with...

  5. Scientific and Technical Reports, Articles, Papers, and Presentations

    NASA Technical Reports Server (NTRS)

    Turner, J. E. (Compiler)

    2000-01-01

    This document presents formal NASA technical reports, papers published in technical journals, and presentations by MSFC personnel in FY99. It also includes papers of MSFC contractors. All of the NASA series reports may be obtained from the NASA Center for AeroSpace Information (CASI), 7121 Standard Drive, Hanover, MD 21076-1320 The information in this report may be of value to the scientific and engineering community in determining what information has been published and what is available.

  6. Communication of Energy Efficiency Information to Remodelers: Lessons From Current Practice

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Liaukus, C.

    2012-10-01

    The effective communication of energy efficiency and building science information to remodeling contractors is achieved through varying formats, timelines, and modes depending on who is delivering the information, who is intended to receive it, and what technical, intellectual,and time resources the recipients have at their disposal. Determining what type of communication is effective does not lend itself to a clearly quantifiable test but rather a qualitative one. That qualitative judgment can be supported by the research of current practices deemed effective for one or more of the following reasons: it has led to the successful completion of a certifying testmore » or other evaluation, it has been widely used for the remodeling industry, it has been considered effective by a sampling of remodeling contractors, and/or it has proven effective in the field for the BARA team. These criteria were used to create a select list of communications to be further analyzed to determine why they are effective and how less successful formats or strategies can be revised for greater effectiveness.« less

  7. NASA Technical Management Report (533Q)

    NASA Technical Reports Server (NTRS)

    Klosko, S. M.; Sanchez, B. (Technical Monitor)

    2001-01-01

    The objective of this task is analytical support of the NASA Satellite Laser Ranging (SLR) program in the areas of SLR data analysis, software development, assessment of SLR station performance, development of improved models for atmospheric propagation and interpretation of station calibration techniques, and science coordination and analysis functions for the NASA led Central Bureau of the International Laser Ranging Service (ILRS). The contractor shall in each year of the five year contract: (1) Provide software development and analysis support to the NASA SLR program and the ILRS. Attend and make analysis reports at the monthly meetings of the Central Bureau of the ILRS covering data received during the previous period. Provide support to the Analysis Working Group of the ILRS including special tiger teams that are established to handle unique analysis problems. Support the updating of the SLR Bibliography contained on the ILRS web site; (2) Perform special assessments of SLR station performance from available data to determine unique biases and technical problems at the station; (3) Develop improvements to models of atmospheric propagation and for handling pre- and post-pass calibration data provided by global network stations; (4) Provide review presentation of overall ILRS network data results at one major scientific meeting per year; (5) Contribute to and support the publication of NASA SLR and ILRS reports highlighting the results of SLR analysis activity.

  8. Out of the Shadows: The Health and Well-Being of Private Contractors Working in Conflict Environments.

    PubMed

    Dunigan, Molly; Farmer, Carrie M; Burns, Rachel M; Hawks, Alison; Setodji, Claude Messan

    2014-01-01

    Over the past decade, private contractors have been deployed extensively around the globe. In addition to supporting U.S. and allied forces in Iraq and Afghanistan, contractors have assisted foreign governments, nongovernmental organizations, and private businesses by providing a wide range of services, including base support and maintenance, logistical support, transportation, intelligence, communications, construction, and security. At the height of the conflicts in Iraq and Afghanistan, contractors outnumbered U.S. troops deployed to both theaters. Although these contractors are not supposed to engage in offensive combat, they may nonetheless be exposed to many of the stressors that are known to have physical and mental health implications for military personnel. RAND conducted an online survey of a sample of contractors who had deployed on contract to a theater of conflict at least once between early 2011 and early 2013. The survey collected demographic and employment information, along with details about respondents' deployment experience (including level of preparation for deployment, combat exposure, and living conditions), mental health (including probable posttraumatic stress disorder, depression, and alcohol misuse), physical health, and access to and use of health care. The goal was to describe the contractors' health and well-being and to explore differences across the sample by such factors as country of citizenship, job specialty, and length and frequency of contract deployment. The findings provide a foundation for future studies of contractor populations and serve to inform policy decisions affecting contractors, including efforts to reduce barriers to mental health treatment for this population.

  9. Research and technology, Lewis Research Center

    NASA Technical Reports Server (NTRS)

    1985-01-01

    The NASA Lewis Research Center's research and technology accomplishments for fiscal year 1985 are summarized. The report is organized into five major sections covering aeronautics, aerospace technology, spaceflight systems, space station systems, and computational technology support. This organization of the report roughly parallels the organization of the Center into directorates. Where appropriate, subheadings are used to identify special topics under the major headings. Results of all research and technology work performed during the fiscal year are contained in Lewis-published technical reports and presentations prepared either by Lewis scientists and engineers or by contractor personnel. In addition, significant results are presented by university faculty or graduate students in technical sessions and in journals of the technical societies. For the reader who desires more information about a particular subject, the Lewis contact will provide that information or references. In 1985, five Lewis products were selected by Research and Development Magazine for IR-100 awards. All are described and identified. In addition, the Lewis Distinguished Paper for 1984 to 1985, which was selected by the Chief Scientist and a research advisory board, is included and so identified.

  10. Common occupational classification system - revision 3

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stahlman, E.J.; Lewis, R.E.

    1996-05-01

    Workforce planning has become an increasing concern within the DOE community as the Office of Environmental Restoration and Waste Management (ER/WM or EM) seeks to consolidate and refocus its activities and the Office of Defense Programs (DP) closes production sites. Attempts to manage the growth and skills mix of the EM workforce while retaining the critical skills of the DP workforce have been difficult due to the lack of a consistent set of occupational titles and definitions across the complex. Two reasons for this difficulty may be cited. First, classification systems commonly used in industry often fail to cover inmore » sufficient depth the unique demands of DOE`s nuclear energy and research community. Second, the government practice of contracting the operation of government facilities to the private sector has introduced numerous contractor-specific classification schemes to the DOE complex. As a result, sites/contractors report their workforce needs using unique classification systems. It becomes difficult, therefore, to roll these data up to the national level necessary to support strategic planning and analysis. The Common Occupational Classification System (COCS) is designed to overcome these workforce planning barriers. The COCS is based on earlier workforce planning activities and the input of technical, workforce planning, and human resource managers from across the DOE complex. It provides a set of mutually-exclusive occupation titles and definitions that cover the broad range of activities present in the DOE complex. The COCS is not a required record-keeping or data management guide. Neither is it intended to replace contractor/DOE-specific classification systems. Instead, the system provides a consistent, high- level, functional structure of occupations to which contractors can crosswalk (map) their job titles.« less

  11. 75 FR 19677 - Medicare Program; Policy and Technical Changes to the Medicare Advantage and the Medicare...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-15

    ... Care and Network-Based Private Fee-for-Service Plans Under Part C (Sec. 422.112) 7. Deemable Program... Cost by HMO/CMP Cost Contractors and Health Care Prepayment Plans (HCPPs) (Sec. 417.564) 4. Calculation... and Other Technical Changes 1. Application of Subpart M to Health Care Prepayment Plans (Sec. 417.840...

  12. EPA Region 9 Targeted Brownfields Assessment (TBA) Application

    EPA Pesticide Factsheets

    EPA provides contractor assistance for property assessment to determine eligibility for up to $100,000 worth of technical assistance. Use this assessment form for properties in Arizona, California, Nevada, and Hawaii.

  13. FY 1999 Scientific and Technical Reports, Articles, Papers, and Presentations

    NASA Technical Reports Server (NTRS)

    Waits, J.oyce E.Turner

    2000-01-01

    This document presents formal NASA technical reports, papers published in technical journals, and presentations by MSFC personnel in FY99. It also includes papers of MSFC contractors. All of the NASA series reports may be obtained from the NASA Center for AeroSpace Information (CASI), 7121 Standard Drive, Hanover, MD 21076-1320 The information in this report may be of value to the scientific and engineering community in determining what information has been published and what is available.

  14. Improved Management of the Technical Interfaces Between the Hanford Tank Farm Operator and the Hanford Waste Treatment Plant - 13383

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Duncan, Garth M.; Saunders, Scott A.

    2013-07-01

    The Department of Energy (DOE) is constructing the Waste Treatment and Immobilization Plant (WTP) at the Hanford site in Washington to treat and immobilize approximately 114 million gallons of high level radioactive waste (after all retrievals are accomplished). In order for the WTP to be designed and operated successfully, close coordination between the WTP engineering, procurement, and construction contractor, Bechtel National, Inc. and the tank farms operating contractor (TOC), Washington River Protection Solutions, LLC, is necessary. To develop optimal solutions for DOE and for the treatment of the waste, it is important to deal with the fact that two differentmore » prime contractors, with somewhat differing contracts, are tasked with retrieving and delivering the waste and for treating and immobilizing that waste. The WTP and the TOC have over the years cooperated to manage the technical interface. To manage what is becoming a much more complicated interface as the WTP design progresses and new technical issues have been identified, an organizational change was made by WTP and TOC in November of 2011. This organizational change created a co-located integrated project team (IPT) to deal with mutual and interface issues. The Technical Organization within the One System IPT includes employees from both TOC and WTP. This team has worked on a variety of technical issues of mutual interest and concern. Technical issues currently being addressed include: - The waste acceptance criteria; - Waste feed delivery and the associated data quality objectives (DQO); - Evaluation of the effects of performing a riser cut on a single shell tank on WTP operations; - The disposition of secondary waste from both TOC and WTP; - The close coordination of the TOC double shell tank mixing and sampling program and the Large Scale Integrated Test (LSIT) program for pulse jet mixers at WTP along with the associated responses to the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 2010-2; - Development of a set of alternatives to the current baseline that involve aspects of direct feed, feed conditioning, and design changes. The One System Technical Organization has served WTP, TOC, and DOE well in managing and resolving issues at the interface. This paper describes the organizational structure used to improve the interface and several examples of technical interface issues that have been successfully addressed by the new organization. (authors)« less

  15. 29 CFR 1952.107 - Changes to approved plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... (b) The State submitted an industrial hygiene technical manual patterned after the Federal manual... under the plan to Superfund sites and private contractors working on U.S. Army Corps of Engineers dam...

  16. Technical Solutions to Common Indoor Air Quality Issues in Schools

    EPA Pesticide Factsheets

    Indoor Air Quality (IAQ) Design Tools for Schools provides voluntary guidance for school personnel, architects, engineers, builders and contractors, parents, and the community on key school construction and renovation issues.

  17. Managing Challenges in a Multi Contractor Project

    NASA Technical Reports Server (NTRS)

    King, Ron

    2011-01-01

    The presentation provides a project description, describes the integrated product team, and review project challenges. The challenges include programmatic, technical, basic drop tests, heavy drop tests, C-17 envelope expansion, and Ares I-X.

  18. Summary of Environmental Data Analysis and Work Performed by Lawrence Livermore National Laboratory (LLNL) in Support of the Navajo Nation Abandoned Mine Lands Project at Tse Tah, Arizona

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Taffet, Michael J.; Esser, Bradley K.; Madrid, Victor M.

    This report summarizes work performed by Lawrence Livermore National Laboratory (LLNL) under Navajo Nation Services Contract CO9729 in support of the Navajo Abandoned Mine Lands Reclamation Program (NAMLRP). Due to restrictions on access to uranium mine waste sites at Tse Tah, Arizona that developed during the term of the contract, not all of the work scope could be performed. LLNL was able to interpret environmental monitoring data provided by NAMLRP. Summaries of these data evaluation activities are provided in this report. Additionally, during the contract period, LLNL provided technical guidance, instructional meetings, and review of relevant work performed by NAMLRPmore » and its contractors that was not contained in the contract work scope.« less

  19. 76 FR 42119 - 36(b)(1) Arms Sales Notification

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-18

    .... Government and contractor engineering and logistics support services, and other related elements of logistics... documentation, U.S. Government and contractor engineering and logistics support services, and other related... range of adverse battlefield conditions. The hardware itself is Unclassified. The engineering design and...

  20. Feasibility Analysis and Prototyping of a Fast Autonomous Recon system

    DTIC Science & Technology

    2017-06-01

    Test and Evaluation Interim Contractor Support System Assessment OPERATIONAL USE AND SYSTEM SUPPORT System Operation in the User Environment...Sustaining Maintenance and Logistics Support Operational Testing System Modifications for Improvement Contractor Support System Assessment...helicopter but has the added benefit of high -speed flight similar to a fixed-wing aircraft. Figure 1 shows the two different flight modes of the V-22

  1. TRICARE Managed Care Support Contractor Program Integrity Units Met Contract Requirements

    DTIC Science & Technology

    2012-12-05

    these contractors because they represented 52 percent of purchased care claims paid in 20 ll for TRICARE beneficiaries. We did not review the dental ...5 (!ru-L..!J(It~ t’J Alice F. Carey Assistant Inspector General Readiness, Operations, and Support

  2. U.S. Northern Command > About USNORTHCOM > Doing Business with USNORTHCOM

    Science.gov Websites

    Central Contractor Registration (CCR) http://www.ccr.gov Vendors should register in the U.S. federal government's Central Contractor Registration (CCR). A Data Universal Numbering System (DUNS®) number, provided planning and conducting contracting and contractor management functions in support of joint operations

  3. Critical Electronic Data Loss Perceptions of United States Military Contractors

    ERIC Educational Resources Information Center

    Singletary, Tod J.

    2017-01-01

    The United States Military has become increasingly dependent upon technology to meet its mission objectives with a consequence being greater dependence on civilian defense contractors to provide specialized services in support of high-tech mission requirements. Modern military defense contractors have also become dependent upon reliable and secure…

  4. Uranium Mill Tailings Remedial Action Project Safety Advancement Field Effort (SAFE) Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-02-01

    In 1992, the Uranium Mill Tailings Remedial Action (UMTRA) Project experienced several health and safety related incidents at active remediation project sites. As a result, the U.S. Department of Energy (DOE) directed the Technical Assistance Contractor (TAC) to establish a program increasing the DOE`s overall presence at operational remediation sites to identify and minimize risks in operations to the fullest extent possible (Attachments A and B). In response, the TAC, in cooperation with the DOE and the Remedial Action Contractor (RAC), developed the Safety Advancement Field Effort (SAFE) Program.

  5. Improvement of force health protection through preventive medicine oversight of contractor support.

    PubMed

    Mower, Scott A

    2009-01-01

    Unprecedented numbers of contractors are used throughout the Iraq theater of operations to alleviate military manpower shortages. At virtually every major forward operating base, US-based contractors perform the preponderance of essential life support services. At more remote sites, local national contractors are increasingly relied upon to maintain chemical latrines, remove trash, deliver bulk water, and execute other janitorial functions. Vigorous oversight of contractor performance is essential to ensure services are delivered according to specified standards. Poor oversight can increase the risk of criminal activities, permit substandard performance, elevate disease and nonbattle injury rates, degrade morale, and diminish Soldier readiness. As the principal force health protection proponents in the Department of Defense, preventive medicine units must be tightly integrated into the oversight processes. This article defines the force health protection implications associated with service contracts and provide recommendations for strengthening preventive medicine's oversight role.

  6. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Reidel, Steve; Chamness, Mickie A.

    This appendix provides a detailed description of geology under the Central Plateau of the Hanford Site, emphasizing the areas around tank farms. It is to be published by client CH2M HILL Hanford Group, Inc., as part of a larger, multi-contractor technical report.

  7. War-gaming application for future space systems acquisition part 1: program and technical baseline war-gaming modeling and simulation approaches

    NASA Astrophysics Data System (ADS)

    Nguyen, Tien M.; Guillen, Andy T.

    2017-05-01

    This paper describes static Bayesian game models with "Pure" and "Mixed" games for the development of an optimum Program and Technical Baseline (PTB) solution for affordable acquisition of future space systems. The paper discusses System Engineering (SE) frameworks and analytical and simulation modeling approaches for developing the optimum PTB solutions from both the government and contractor perspectives.

  8. The 1990 Johnson Space Center bibliography of scientific and technical papers

    NASA Technical Reports Server (NTRS)

    1991-01-01

    Abstracts are presented of scientific and technical papers written and/or presented by L. B. Johnson Space Center (JSC) authors, including civil servants, contractors, and grantees, during the calendar year of 1990. Citations include conference and symposium presentations, papers published in proceedings or other collective works, seminars, and workshop results, NASA formal report series (including contractually required final reports), and articles published in professional journals.

  9. Producibility and Production Aspects of the Market Analysis Process

    DTIC Science & Technology

    1989-06-01

    for most TROSCOM general purpose systems and equipment are the U.S. Army Quartermaster Center and School, Fort Lee, VA ( fuels handling and storage...established a Mission Area Proponency Branch staffed with military R&D Coordinator Officers (formerly TRISOs - Technical Requirements Integration Staff...time is spent reacting, rather than acting, i.e., the amount of work required to supply numerous reports on delinquent contractors and on Technical

  10. The 1979 Ames Research Center Publications: A continuing bibliography

    NASA Technical Reports Server (NTRS)

    1979-01-01

    This bibliography lists formal NASA publications, journal articles, books, chapters of books, patents, and contractor reports issued by Ames Research Center which were indexed by Scientific and Technical Aerospace Reports, Limited Scientific and Technical Aerospace Reports, and International Aerospace Abstracts in 1979. Citations are arranged by directorate, type of publication, and NASA accession numbers. Subject, Personal Author, Corporate Source, Contract Number, and Report/Accession Number Indexes are provided.

  11. Ames Research Center publications: A continuing bibliography, 1978

    NASA Technical Reports Server (NTRS)

    1980-01-01

    This bibliography lists formal NASA publications, journal articles, books, chapters of books, patents and contractor reports issued by Ames Research Center which were indexed by Scientific and Technical Aerospace Abstracts, Limited Scientific and Technical Aerospace Abstracts, and International Aerospace Abstracts in 1978. Citations are arranged by directorate, type of publication and NASA accession numbers. Subject, personal author, corporate source, contract number, and report/accession number indexes are provided.

  12. Bibliography of NASA published reports on general aviation, 1975 to 1981

    NASA Technical Reports Server (NTRS)

    1981-01-01

    This bibliography lists 478 documents which relate to all heavier-than-air fixed wing aircraft exclusive of military types and those used for commercial air transport. An exception is the inclusion of commuter transport aircraft types within the general aviation category. NASA publications included in this bibliography are: conference publications (CP), reference publications (RP), technical memorandums (TM, TMX), technical notes (TN), technical papers (TP), and contractor reports (CR). In addition, papers and articles on NASA general aviation programs published by technical societies (AIAA, SAE, etc.) are included, as well as those listed in NASA's Scientific and Technical Aerospace Reports (STAR) Journal. Author and subject indexes are also provided to facilitate use of the bibliography.

  13. Special Purpose Systems

    DTIC Science & Technology

    2017-01-30

    Nontraditional Defense Contractor Participation, and Plans for Next Quarter. II. Business Status Report. The business status report shall provide...DoD & DoD Contractors only. E. FINAL BUSINESS STATUS REPORT At the completion of the Ordnance Technology Initiative Agreement, the...traditional Contractors to produce advanced machining techniques that are required by the SPS group. • Provide acquisition support for reducing

  14. ORD BBS USER'S MANUAL - VERSION 2.0

    EPA Science Inventory

    The Office of Research and Development's Electronic Bulletin Board System (BBS or ''Board") is designed to facilitate the exchange of technical information and ORD products among EPA Headquarters, laboratory and Regional staff and contractors; States; other Federal agencies, univ...

  15. 77 FR 76936 - Defense Federal Acquisition Regulation Supplement; Technical Amendments

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-31

    ...; List of Subjects in 48 CFR Parts 201, 203, 204, 215, 219, 245, and 252 Government procurement. Manuel... clause 52.203-13, Contractor Code of Business Ethics and Conduct, is the DoD Office of Inspector General...

  16. 48 CFR 1348.102 - Policies.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... ENGINEERING Policies and Procedures 1348.102 Policies. (a) Contracting activities shall send contractor-submitted Value Engineering Change Proposals (VECPs) to the appropriate technical personnel for review. (b... rejection to the contracting officer. (c) The designee authorized to grant exemptions from value engineering...

  17. Nuclear waste disposal in space

    NASA Technical Reports Server (NTRS)

    Burns, R. E.; Causey, W. E.; Galloway, W. E.; Nelson, R. W.

    1978-01-01

    Work on nuclear waste disposal in space conducted by the George C. Marshall Space Flight Center, National Aeronautics and Space Administration, and contractors are reported. From the aggregate studies, it is concluded that space disposal of nuclear waste is technically feasible.

  18. Contractor Logistics Support in the U.S. Air Force

    DTIC Science & Technology

    2009-01-01

    limits), or it can engage in a mix of the two approaches.2 This monograph addresses CLS, which is defined as contractor sustainment of a weapon system...organic facilities; it can pay contractors to do the work (subject to some congressional limits); or it can apply a mix of the two approaches.2 Organic...levels are largely stable and represent a mix of services, including contractor operated facilities and instal- Figure 3.1 Air Force CSS for Weapon

  19. Research and Technology, 1994

    NASA Technical Reports Server (NTRS)

    1995-01-01

    This report selectively summarizes the NASA Lewis Research Center's research and technology accomplishments for the fiscal year 1994. It comprises approximately 200 short articles submitted by the staff members of the technical directorates. The report is organized into six major sections: Aeronautics, Aerospace Technology, Space Flight Systems, Engineering and Computational Support, Lewis Research Academy, and Technology Transfer. A table of contents and author index have been developed to assist the reader in finding articles of special interest. This report is not intended to be a comprehensive summary of all research and technology work done over the past fiscal year. Most of the work is reported in Lewis-published technical reports, journal articles, and presentations prepared by Lewis staff members and contractors. In addition, university grants have enabled faculty members and graduate students to engage in sponsored research that is reported at technical meetings or in journal articles. For each article in this report a Lewis contact person has been identified, and where possible, reference documents are listed so that additional information can be easily obtained. The diversity of topics attests to the breadth of research and technology being pursued and to the skill mix of the staff that makes it possible.

  20. Goddard Visiting Scientist Program

    NASA Technical Reports Server (NTRS)

    2000-01-01

    Under this Indefinite Delivery Indefinite Quantity (IDIQ) contract, USRA was expected to provide short term (from I day up to I year) personnel as required to provide a Visiting Scientists Program to support the Earth Sciences Directorate (Code 900) at the Goddard Space Flight Center. The Contractor was to have a pool, or have access to a pool, of scientific talent, both domestic and international, at all levels (graduate student to senior scientist), that would support the technical requirements of the following laboratories and divisions within Code 900: 1) Global Change Data Center (902); 2) Laboratory for Atmospheres (Code 910); 3) Laboratory for Terrestrial Physics (Code 920); 4) Space Data and Computing Division (Code 930); 5) Laboratory for Hydrospheric Processes (Code 970). The research activities described below for each organization within Code 900 were intended to comprise the general scope of effort covered under the Visiting Scientist Program.

  1. 48 CFR 252.225-7040 - Contractor Personnel Supporting U.S. Armed Forces Deployed Outside the United States.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CLAUSES AND FORMS... Directive 3002.01E, Personnel Recovery in the Department of Defense. (o) Mortuary affairs. Contractor... Commander or as directed by the Secretary of Defense. (2) Contract performance in support of U.S. Armed...

  2. Ames Research Center publications: A continuing bibliography, 1980

    NASA Technical Reports Server (NTRS)

    1981-01-01

    This bibliography lists formal NASA publications, journal articles, books, chapters of books, patents, contractor reports, and computer programs that were issued by Ames Research Center and indexed by Scientific and Technical Aerospace Reports, Limited Scientific and Technical Aerospace Reports, International Aerospace Abstracts, and Computer Program Abstracts in 1980. Citations are arranged by directorate, type of publication, and NASA accession numbers. Subject, personal author, corporate source, contract number, and report/accession number indexes are provided.

  3. Private Contractors in Conflict Zones: The Good, the Bad, and the Strategic Impact

    DTIC Science & Technology

    2011-01-01

    civilians such as the DynCorp employee who ran a child sex ring in the Balkans or the Sep- tember 2007 Blackwater shootings in Nisour Square, Baghdad...without contractor support. This is not a new phenomenon. DOD—particularly the Air Force and Navy —has long relied on contractors to fill niche...www.wartimecontracting.gov) Plane from private contractor blackwater Air closely follows lead element after supply drop to friendly forces in sharana, Afghanistan U

  4. 7 CFR 1944.407 - Limitations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... REGULATIONS (CONTINUED) HOUSING Self-Help Technical Assistance Grants § 1944.407 Limitations. The amount of... Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE, RURAL BUSINESS-COOPERATIVE... typical needed repairs, and the cost savings between self-help and contractor rehabilitation and repair...

  5. 48 CFR 49.202 - Profit.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... ordinarily should not be required, but if available should be considered); (2) Engineering work, production scheduling, planning, technical study and supervision, and other necessary services; (3) Efficiency of the contractor, with particular regard to— (i) Attainment of quantity and quality production; (ii) Reduction of...

  6. 48 CFR 42.302 - Contract administration functions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...) Perform preaward surveys (see Subpart 9.1). (33) Advise and assist contractors regarding their priorities... with contractual terms for schedule, cost, and technical performance in the areas of design... efforts and management systems that relate to design, development, production, engineering changes...

  7. 48 CFR 42.302 - Contract administration functions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...) Perform preaward surveys (see Subpart 9.1). (33) Advise and assist contractors regarding their priorities... with contractual terms for schedule, cost, and technical performance in the areas of design... efforts and management systems that relate to design, development, production, engineering changes...

  8. 48 CFR 42.302 - Contract administration functions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...) Perform preaward surveys (see Subpart 9.1). (33) Advise and assist contractors regarding their priorities... with contractual terms for schedule, cost, and technical performance in the areas of design... efforts and management systems that relate to design, development, production, engineering changes...

  9. 48 CFR 42.302 - Contract administration functions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) Perform preaward surveys (see Subpart 9.1). (33) Advise and assist contractors regarding their priorities... with contractual terms for schedule, cost, and technical performance in the areas of design... efforts and management systems that relate to design, development, production, engineering changes...

  10. 48 CFR 34.202 - Integrated Baseline Reviews.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... inherent risks in offerors'/contractors' performance plans and the underlying management control systems...) The degree to which the management process provides effective and integrated technical/schedule/cost... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Integrated Baseline...

  11. An Overview of the Performance of the Chandra X-ray Observatory

    NASA Technical Reports Server (NTRS)

    Weisskopf, M. C.; Aldcroft, T. L.; Bautz, M.; Cameron, R. A.; Dewey, D.; Drake, J. J.; Grant, C. E.; Marshall, H. L.; Murray, S. S.

    2004-01-01

    The Chandra X-ray Observatory is the X-ray component of NASA's Great Observatory Program which includes the recently launched Spitzer Infrared Telescope, the Hubble Space Telescope (HST) for observations in the visible, and the Compton Gamma-Ray Observatory (CGRO) which, after providing years of useful data has reentered the atmosphere. All these facilities provide, or provided, scientific data to the international astronomical community in response to peer-reviewed proposals for their use. The Chandra X-ray Observatory was the result of the efforts of many academic, commercial, and government organizations primarily in the United States but also in Europe. NASA s Marshall Space Flight Center (MSFC) manages the Project and provides Project Science; Northrop Grumman Space Technology (NGST - formerly TRW) served as prime contractor responsible for providing the spacecraft, the telescope, and assembling and testing the Observatory; and the Smithsonian Astrophysical Observatory (SAO) provides technical support and is responsible for ground operations including the Chandra X-ray Center (CXC). Telescope and instrument teams at SAO, the Massachusetts Institute of Technology (MIT), the Pennsylvania State University (PSU), the Space Research Institute of the Netherlands (SRON), the Max-Planck Institut fur extraterrestrische Physik (MPE), and the University of Kiel support also provide technical support to the Chandra Project. We present here a detailed description of the hardware, its on-orbit performance, and a brief overview of some of the remarkable discoveries that illustrate that performance.

  12. 48 CFR 52.225-19 - Contractor Personnel in a Designated Operational Area or Supporting a Diplomatic or Consular...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... are only authorized to use deadly force in self-defense. (ii) Contractor personnel performing security... Department of Defense, or the contract relates to supporting the mission of the Department of Defense outside... Defense has primary responsibility for recovering DoD contract service employees and, when requested, will...

  13. 48 CFR 52.225-19 - Contractor Personnel in a Designated Operational Area or Supporting a Diplomatic or Consular...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... are only authorized to use deadly force in self-defense. (ii) Contractor personnel performing security... Department of Defense, or the contract relates to supporting the mission of the Department of Defense outside... Defense has primary responsibility for recovering DoD contract service employees and, when requested, will...

  14. 48 CFR 52.225-19 - Contractor Personnel in a Designated Operational Area or Supporting a Diplomatic or Consular...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... are only authorized to use deadly force in self-defense. (ii) Contractor personnel performing security... Department of Defense, or the contract relates to supporting the mission of the Department of Defense outside... Defense has primary responsibility for recovering DoD contract service employees and, when requested, will...

  15. Defense AT and L Magazine. Vol. 45, no. 5, September-October 2016

    DTIC Science & Technology

    2016-09-01

    standard federal assistance awards. These contractors might be small, startup technology firms supported by venture capital, leading-edge technology...to provide effective contract oversight and present an accurate picture of contractor performance to the procuring contracting office. Lesson...mission footprints encompass a great deal of contractor activity, leadership that is not regularly engaged with the acquisition team often gives

  16. 48 CFR 35.009 - Subcontracting research and development effort.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... the best scientific and technological sources, it is important that the contractor not subcontract technical or scientific work without the contracting officer's advance knowledge. During the negotiation of a cost-reimbursement R&D contract, the contracting officer shall obtain complete information...

  17. 48 CFR 1845.7210-1 - Utilization surveys.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Utilization surveys. 1845... surveys. (a) The property administrator is responsible for ensuring that the contractor has effective... administration office shall provide specialists qualified to perform the technical portion of utilization surveys...

  18. 78 FR 48424 - 36(b)(1) Arms Sales Notification

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-08

    ... Notification AGENCY: Defense Security Cooperation Agency, Department of Defense ACTION: Notice. SUMMARY: The..., personnel training and training equipment, site surveys, Quality Assurance Teams, U.S. Government and... Teams, U.S. Government and contractor technical assistance, and other related elements of program and...

  19. 48 CFR 2035.70 - Contract clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 2035.70 Contract clauses. (a) The contracting officer shall insert the following clause in all solicitations and contracts for research and development by private contractors and universities and for other technical services, as appropriate: (1) Section 2052.235-70...

  20. NASA scientific and technical program: User survey

    NASA Technical Reports Server (NTRS)

    Hunter, Judy F.; Shockley, Cynthia W.

    1993-01-01

    Results are presented of an intensive user requirements survey conducted by NASA's Scientific and Technical Information (STI) Program with the goal of improving the foundation for the user outreach program. The survey was carried out by interviewing 550 NASA scientists, engineers, and contractors and by analyzing 650 individual responses to a mailed out questionnaire. To analyze the user demographic data, a data base was built and used, and will be applied to ongoing analysis by the NASA STI Program.

  1. Energy Materials Coordinating Committee (EMaCC). Annual technical report, Fiscal Year 2001

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    2002-08-01

    The DOE Energy Materials Coordinating Committee (EMaCC) serves primarily to enhance coordination among the Department's materials programs and to further effective use of materials expertise within the Department. These functions are accomplished through the exchange of budgetary and planning information among program managers and through technical meetings/workshops on selected topics involving both DOE and major contractors. In addition, EMaCC assists in obtaining materials-related inputs for both intra- and interagency compilations.

  2. Putting EVM to the Test

    NASA Technical Reports Server (NTRS)

    Kerby, Jerald; Counts, Stacy

    2005-01-01

    IN MANY INSTANCES THERE IS NO FOREWARNING; SCHEDULES slip, costs soar, and the project manager is faced with the near impossible task of explaining why each impact occurred. With contractors performing the majority of the work, the management job can become even more obscure. The simple lack of proximity to the contractor can limit effective communication. Add to that a mixture of cultural differences and a desire for the contractor to portray the most optimistic view of their performance, and you create an even more difficult task for the project manager. This was the scenario when the Habitat Holding Rack (HHR) manager at Marshall Space Flight Center (MSFC), Stacy Counts, was introduced to the overall concept of Earned Value Management (EVM). Faced with increased costs (which eventually resulted in decreased scope of the project), continued schedule slides, and several technical anomalies, she was looking for a way to gain a better handle on the project performance. As a component of the Space Station Biological Research Program (SSBRP), the HHR project is an integral piece of the Program content. The HHR is the first rack hardware to be delivered for the Program and has therefore been the first rack to move through the trials of test and verification-documenting anomalies and technical difficulties that will benefit the other SSBRP rack projects. For these reasons, the HHR maintained high visibility throughout the manufacturing and assembly process, continuing through test and verification activities. Needless to say, the higher visibility emphasized the need for improved performance on this project. And to improve project performance, Stacy first had to figure out how to measure the cost, schedule and technical objectives effectively.

  3. DOE technical standards list: Directory of DOE and contractor personnel involved in non-government standards activities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-08-01

    The body of this document contains a listing of DOE employees and DOE contractors who have submitted form DOE F 1300.2, Record of Non-Government Standards Activity, which is attached to the end of this document and to DOE Order 1300.2A. Additional names were added from rosters supplied by non-Government standards bodies. The committees or governing bodies in which the person participates is listed after each name. An asterisk preceding the committee notation indicates that the person has identified himself or herself as the DOE representative on that committee. Appendices to this document are also provided to sort the information bymore » the parent employment organization, by non-Government standards activity, and by the proper names of the non-Government standards organizations and committees. DOE employees and contractors listed in this TSL are those recorded as of July 1, 1996.« less

  4. Defense Organization Officials Did Not Consistently Comply With Requirements for Assessing Contractor Performance

    DTIC Science & Technology

    2017-02-01

    must evaluate compliance with reporting requirements frequently so they can readily identify delinquent past performance reports.24 The FAR also...problems the contractor recovered from without impact to the contract/ order. There should have been no significant weaknesses identified. A...contractor had trouble overcoming and state how it impacted the Government. A Marginal rating should be supported by referencing the management tool

  5. 48 CFR 16.104 - Factors in selecting contract types.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... provide the bases for negotiating contract pricing arrangements. It is essential that the uncertainties... performance or length of production run. In times of economic uncertainty, contracts extending over a relatively long period may require economic price adjustment terms. (g) Contractor's technical capability and...

  6. 42 CFR 495.348 - Procurement standards.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... contractor integrity, record of past performance, financial and technical resources or accessibility to other.... The grantee must maintain written standards of conduct governing the performance of its employees... employs or is about to employ any of the parties indicated herein, has a financial or other interest in...

  7. 7 CFR 4280.121 - Servicing grants.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE LOANS AND GRANTS Rural Energy for America Program General Renewable Energy System and Energy Efficiency Improvement Grants § 4280.121 Servicing grants. (a... technical merit score for the project remains the same or is higher. Prior to changing a contractor or...

  8. 7 CFR 4280.121 - Servicing grants.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE LOANS AND GRANTS Rural Energy for America Program General Renewable Energy System and Energy Efficiency Improvement Grants § 4280.121 Servicing grants. (a... technical merit score for the project remains the same or is higher. Prior to changing a contractor or...

  9. 7 CFR 4280.121 - Servicing grants.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE LOANS AND GRANTS Rural Energy for America Program General Renewable Energy System and Energy Efficiency Improvement Grants § 4280.121 Servicing grants. (a... technical merit score for the project remains the same or is higher. Prior to changing a contractor or...

  10. 40 CFR 1.33 - Office of Administration and Resources Management.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... provides national program policy and technical guidance for: The acquisition of all information technology... acquired by grantees and contractors using Agency funds; the operation of all Agency computers and... Management Interns, OHRM establishes policies; assesses and projects Agency executive needs and workforce...

  11. 32 CFR 286.12 - Exemptions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... with an application for a research grant, or with a report while research is in progress. (6) Technical... contractors and their products. (iv) Information of a speculative, tentative, or evaluative nature or such... research development, or commercial information owned by the Government, where premature release is likely...

  12. 32 CFR 291.8 - Exemptions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... data or other information, submitted with an application for a research grant, or with a report, while research is in progress. (vi) Technical or scientific data developed by a contractor or subcontractor... speculative, tentative, or evaluative nature or such matters as proposed plans to procure, lease or otherwise...

  13. 32 CFR 286.12 - Exemptions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... with an application for a research grant, or with a report while research is in progress. (6) Technical... contractors and their products. (iv) Information of a speculative, tentative, or evaluative nature or such... research development, or commercial information owned by the Government, where premature release is likely...

  14. 32 CFR 291.8 - Exemptions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... data or other information, submitted with an application for a research grant, or with a report, while research is in progress. (vi) Technical or scientific data developed by a contractor or subcontractor... speculative, tentative, or evaluative nature or such matters as proposed plans to procure, lease or otherwise...

  15. 32 CFR 286.12 - Exemptions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... with an application for a research grant, or with a report while research is in progress. (6) Technical... contractors and their products. (iv) Information of a speculative, tentative, or evaluative nature or such... research development, or commercial information owned by the Government, where premature release is likely...

  16. 32 CFR 291.8 - Exemptions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... data or other information, submitted with an application for a research grant, or with a report, while research is in progress. (vi) Technical or scientific data developed by a contractor or subcontractor... speculative, tentative, or evaluative nature or such matters as proposed plans to procure, lease or otherwise...

  17. 32 CFR 286.12 - Exemptions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... with an application for a research grant, or with a report while research is in progress. (6) Technical... contractors and their products. (iv) Information of a speculative, tentative, or evaluative nature or such... research development, or commercial information owned by the Government, where premature release is likely...

  18. 32 CFR 286.12 - Exemptions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... with an application for a research grant, or with a report while research is in progress. (6) Technical... contractors and their products. (iv) Information of a speculative, tentative, or evaluative nature or such... research development, or commercial information owned by the Government, where premature release is likely...

  19. 32 CFR 291.8 - Exemptions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... data or other information, submitted with an application for a research grant, or with a report, while research is in progress. (vi) Technical or scientific data developed by a contractor or subcontractor... speculative, tentative, or evaluative nature or such matters as proposed plans to procure, lease or otherwise...

  20. 32 CFR 291.8 - Exemptions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... data or other information, submitted with an application for a research grant, or with a report, while research is in progress. (vi) Technical or scientific data developed by a contractor or subcontractor... speculative, tentative, or evaluative nature or such matters as proposed plans to procure, lease or otherwise...

  1. 7 CFR 226.22 - Procurement standards.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... pertinent to the following: rationale for the method of procurement, selection of contract type, contractor... competition. The description may include a statement of the qualitative nature of the material, product or... technical resources. (i) Program procurements shall be made by one of the following methods: (1) Small...

  2. 34 CFR 472.5 - What definitions apply?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... division of a junior college or community college or university operating under the policies of the State... Chambers of Commerce; (4) Associations of private industry councils; and (5) Educational associations—such... Universities, or the National Association of Technical and Trade Schools. Contractor means an individual or...

  3. 34 CFR 472.5 - What definitions apply?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... division of a junior college or community college or university operating under the policies of the State... Chambers of Commerce; (4) Associations of private industry councils; and (5) Educational associations—such... Universities, or the National Association of Technical and Trade Schools. Contractor means an individual or...

  4. 40 CFR 1.33 - Office of Administration and Resources Management.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... provides national program policy and technical guidance for: The acquisition of all information technology... acquired by grantees and contractors using Agency funds; the operation of all Agency computers and... Management Interns, OHRM establishes policies; assesses and projects Agency executive needs and workforce...

  5. 40 CFR 1.33 - Office of Administration and Resources Management.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... provides national program policy and technical guidance for: The acquisition of all information technology... acquired by grantees and contractors using Agency funds; the operation of all Agency computers and... Management Interns, OHRM establishes policies; assesses and projects Agency executive needs and workforce...

  6. 40 CFR 1.33 - Office of Administration and Resources Management.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... provides national program policy and technical guidance for: The acquisition of all information technology... acquired by grantees and contractors using Agency funds; the operation of all Agency computers and... Management Interns, OHRM establishes policies; assesses and projects Agency executive needs and workforce...

  7. 75 FR 37799 - Dynamac Corporation; Transfer of Data

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-30

    ... of Data AGENCY: Environmental Protection Agency (EPA). ACTION: Notice. SUMMARY: This notice announces...: Under Contract No. EP10H001452, the contractor shall review and/or update approximately 280 Data... Officer Representative (COR). The technical direction will provide key scientific questions and data sets...

  8. Contraceptive social marketing in the third world: a case of multiple transfer.

    PubMed

    Luthra, R

    1991-01-01

    A researcher conducted a case study of the Family Planning Social Marketing Project (FPSMP) in Bangladesh between 1974-1987 to point out the irreducible qualitative differences between the commercial and social contexts and between the developed and developing world. The research consisted of interviews with chief personnel of the technical assistance contractor Population Services International (PSI), project documentation, a review of marketing principles and methods, and summary reports on contraceptive social marketing projects in various countries. FPSMP, a vertical marketing organization, marketed 3 condom brands, 2 oral contraceptive brands, and 1 vaginal foam tablet. At least 70% of the advertising budget was allocated for conventional media (television [TV], radio, and newspapers), even though the poor and illiterate target population did not own a radio or TV and could not read a newspaper. In fact, conventional media were basically accessible to the urban elite. A PSI leader defended the use of conventional media because opinion leaders (urban elite) exert considerable influence on the population so they must receive the family planning messages in order to support family planning. Yet this assumption had not been tested, but was based on the experience of technical assistance contractors from previous projects in developing countries. Moreover, FPSMP based acceptability of message content on the elite's definition and not on the definition of the target group. Its information strategy included emphasis on the sales indicator and the creation of positive product associations while downplaying information about side effects and contraindications. This indicated that FPSMP did not consider client health and well being as important. Another issue was the need to satisfy USAID and the government. More research on other social marketing projects is needed.

  9. TRADE ALARA for design and operations engineers

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-04-01

    This product has been developed by the Training Resources and Data Exchange (TRADE) network for use at Department of Energy (DOE) and DOE contractor facilities. The TRADE network encourages and facilitates the exchange of ideas, techniques, and resources for improving training and development and serves as a forum for the discussion of issues of interest to the DOE community. This TRADE product has been developed for DOE contractor employees who are asked to deliver training to Design and Operations Engineers on the concept of As Low As Reasonably Achievable (ALARA). The ALARA concept is an approach to radiation protection tomore » control or manage exposures as low as social, technical, economic, practical, public policy, and other considerations permit. Worldwide panels of radiation experts have concluded that it is conservative to assume that a proportional relationship exists between radiation dose (exposure) and the biological effects resulting from it. This assumption implies that every dose received, no matter how small, carries some risk: the higher the dose, the higher the risk. The federal government, including agencies such as DOE, subscribes to the concept of ALARA and requires its facilities to subscribe to it as well. This course was developed to introduce engineers to the fundamentals of radiation and contamination reduction that they will use when designing or modifying plant facilities. The course was developed by the ALARA Program group and the Radiation Protection Monitoring/Training Group of Martin Marietta Energy Systems, Inc. at Oak Ridge National Laboratory. We wish to express our appreciation to Emily Copenhaver, Scott Taylor, and Janet Westbrook at Oak Ridge National Laboratory for their willingness to share their labors with the rest of the DOE community and for technical support during the development of the TRADE ALARA for Design and Operations Engineers Course Manual.« less

  10. Crystal Growth of ZnSe and Related Ternary Compound Semiconductors by Physical Vapor Transport

    NASA Technical Reports Server (NTRS)

    Cushman, Paula P.

    1997-01-01

    Preliminary definition of all of the necessary materials, labor, services, and facilities necessary to provide science requirement definition, initiate hardware development activities, and provide an update flight program proposal consistent with the NRA selection letter. The major tasks identified in this SOW are in the general category of science requirements determination, instrument definition, and updated flight program proposal. The Contractor shall define preliminary management, technical and integration requirements for the program, including improved cost/schedule estimates. The Contractor shall identify new technology requirements, define experiment accommodations and operational requirements and negotiate procurement of any long lead items, if required, with the government.

  11. Crystal Growth of ZnSe and Related Ternary Compound Semiconductors by Physical Vapor Transport

    NASA Technical Reports Server (NTRS)

    Su, Ching-Hua

    1997-01-01

    Preliminary definition of all of the necessary materials, labor, services, and facilities necessary to provide science requirement definition, initiate hardware development activities, and provide an updated flight program proposal consistent with the NRA selection letter. The major tasks identified in this SOW are in the general category of science requirements determination, instrument definition, and updated flight program proposal. The Contractor shall define preliminary management, technical and integration requirements for the program, including improved cost/schedule estimates. The Contractor shall identify new technology requirements, define experiment accommodations and operational requirements and negotiate procurement of any long lead items, if required, with the government.

  12. Semiannual Technical Summary, 1 April-30 September 1990 (Royal Norwegian Council for Scientific and Industrial Research)

    DTIC Science & Technology

    1990-11-01

    Royal Norwegian Council for Scientific and Industrial Research (NTNF) ____ AD-A241 670 NORSAR Scientific Report No . 1-90/91 Semiannual Technical...ARPA Order No . 4138 AMD # 16 Program Code No . OF10 Name of Contractor Royal Norwegian Council for Scientific and Industrial Research Effective Date of...Advanced (If applicable) Contract No . F08606-89-C-0005 Research Projects Agency NMRO 8c. ADDRESS (City, State, and ZIP Code) 10. SOURCE OF FUNDING NUMBERS

  13. Traffic safety data : state data system quality varies and limited resources and coordination can inhibit further progress

    DOT National Transportation Integrated Search

    2010-04-01

    GAOs analysis of traffic records assessmentsconducted for states by NHTSA technical teams or contractors at least every 5 yearsindicates that the quality of state traffic safety data systems varies across the six data systems maintained by s...

  14. Fourth technical contractors' conference on peat

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1981-01-01

    This conference reported the status of the US Department of Energy Peat Program. The papers presented dealt with peat dewatering, international peat programs, environmental and socio-economic factors, peat gasification, peat harvesting, and the state peat surveys for 14 states. Separate abstracts were prepared for the individual papers. (CKK)

  15. 48 CFR 215.404-71-2 - Performance risk.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Performance risk. 215.404... Pricing 215.404-71-2 Performance risk. (a) Description. This profit factor addresses the contractor's...—the technical uncertainties of performance. (2) Management/cost control—the degree of management...

  16. 48 CFR 215.404-71-2 - Performance risk.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Performance risk. 215.404... Pricing 215.404-71-2 Performance risk. (a) Description. This profit factor addresses the contractor's...—the technical uncertainties of performance. (2) Management/cost control—the degree of management...

  17. 48 CFR 215.404-71-2 - Performance risk.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Performance risk. 215.404... Pricing 215.404-71-2 Performance risk. (a) Description. This profit factor addresses the contractor's...—the technical uncertainties of performance. (2) Management/cost control—the degree of management...

  18. 48 CFR 2937.602 - Elements of performance-based contracting.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... objectively measurable incentives (e.g., Firm-Fixed-Price, Fixed-Price-Incentive-Fee, or Cost-Plus-Incentive-Fee) is appropriate. However, when contractor performance (e.g., cost control, schedule, or quality/technical) is best evaluated subjectively using qualitative measures, a Cost-Plus-Award-Fee contract may be...

  19. Technical memo, project 0-6132 : task 6 - test sections in the districts.

    DOT National Transportation Integrated Search

    2011-02-01

    This Tech Memo provides a summary of the Lab Test, Distress Survey, and Construction Reports for the CAM Test Sections constructed on FM 158 (E William J. Bryan Pkwy) in the Bryan District. TTI was requested by both the Contractor (Knife River Corpor...

  20. Defense Logistics Agency Aviation Can Improve its Processes to Obtain Restitution From Contractors That Provide Defective Spare Parts

    DTIC Science & Technology

    2016-02-23

    supports the warfighter; promotes accountability , integrity, and efficiency; advises the Secretary of Defense and Congress; and informs the public...cause correction, and status accounting of individual product quality deficiencies. The process primarily focuses on the following roles...the contractor incorrectly manufactured all 100 parts and the contractor agreed to replace them if returned. To properly account for all 100

  1. Replacing Military Personnel in Some Support Positions With Federal Civilians

    DTIC Science & Technology

    2016-07-03

    Commercial and Open to Contractors Commercial but Not Open to  Contractors Inherently Governmental 6CONGRESS IONAL  BUDGET  OFFICE Two main job categories...agreements 9CONGRESS IONAL  BUDGET  OFFICE Military Positions in Commercial Functions Not Open to  Contractors , by Reason, 2012 Thousands Army Navy Air

  2. HOW THE MILITARY CAN INTEGRATE UNMANNED AERIAL SYSTEMS IN THE CIVIL RESERVE AIR FLEET

    DTIC Science & Technology

    2016-10-01

    brings new capabilities and continues to fundamentally impact military doctrine and strategy, particularly in how civilian operators or contractors ...missions has stretched military personnel and resources thin. General Atomics, a California-based defense contractor , produces the highly successful MQ-1...and a large number of support personnel required to operate UAS missions. An already established civilian contractor presence AU/ACSC/2016 5

  3. Progress and future direction for the interim safe storage and disposal of Hanford high-level waste

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kinzer, J.E.; Wodrich, D.D.; Bacon, R.F.

    This paper describes the progress made at the largest environmental cleanup program in the United States. Substantial advances in methods to start interim safe storage of Hanford Site high-level wastes, waste characterization to support both safety- and disposal-related information needs, and proceeding with cost-effective disposal by the U.S. Department of Energy (DOE) and its Hanford Site contractors, have been realized. Challenges facing the Tank Waste Remediation System (TWRS) Program, which is charged with the dual and parallel missions of interim safe storage and disposal of the high-level tank waste stored at the Hanford Site, are described. In these times ofmore » budget austerity, implementing an ongoing program that combines technical excellence and cost effectiveness is the near-term challenge. The technical initiatives and progress described in this paper are made more cost effective by DOE`s focus on work force productivity improvement, reduction of overhead costs, and reduction, integration and simplification of DOE regulations and operations requirements to more closely model those used in the private sector.« less

  4. A bootstrap lunar base: Preliminary design review 2

    NASA Technical Reports Server (NTRS)

    1987-01-01

    A bootstrap lunar base is the gateway to manned solar system exploration and requires new ideas and new designs on the cutting edge of technology. A preliminary design for a Bootstrap Lunar Base, the second provided by this contractor, is presented. An overview of the work completed is discussed as well as the technical, management, and cost strategies to complete the program requirements. The lunar base design stresses the transforming capabilities of its lander vehicles to aid in base construction. The design also emphasizes modularity and expandability in the base configuration to support the long-term goals of scientific research and profitable lunar resource exploitation. To successfully construct, develop, and inhabit a permanent lunar base, however, several technological advancements must first be realized. Some of these technological advancements are also discussed.

  5. 25 CFR 276.12 - Procurement standards.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... be given to such matters as contractor integrity, record of past performance, financial and technical... conduct which shall govern the performance of its officers, employees, or agents in contracting with and.... “Brand name or equal” description may be used as a means to define the performance or other salient...

  6. 77 FR 75766 - Federal Acquisition Regulation; Nondisplacement of Qualified Workers Under Service Contracts

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-21

    ... offeror's ingenuity in proposing a technical approach or solution based on limitations of the existing... solution. Another respondent expressed concern that the rule would limit offerors' ability to craft innovative solutions to Government requirements. Response: Under the SCA, the successor contractor must pay...

  7. Selling to NASA

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The prospective NASA contractor is provided with information that describes the agency and its procurement practices. Products include ideas, manufacturing capabilities, fabricated components, construction, basic materials, and specialized services. NASA assistance in marketing these and other products is emphasized. Small and minority business enterprises are discussed. The agency's scientific and technical information activities are also discussed.

  8. 48 CFR 237.102-72 - Contracts for management services.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... development or production of the major system ensures that Federal employees are responsible for determining— (1) Courses of action to be taken in the best interest of the Government; and (2) Best technical performance for the warfighter; and (c) The contract requires that the prime contractor for the contract may...

  9. 78 FR 66865 - Acquisition Regulation: Patents, Data, and Copyrights

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-07

    ... obligations under current law. The proposed changes include policy revisions for computer software developed.... Computer Software DOE's existing Rights in Technical Data-Technology Transfer clause at 970.5227-2 provides mechanisms by which computer software first produced by a DOE contractor may be made available to the public...

  10. Sensitivity of School-Performance Ratings to Scaling Decisions

    ERIC Educational Resources Information Center

    Ng, Hui Leng; Koretz, Daniel

    2015-01-01

    Policymakers usually leave decisions about scaling the scores used for accountability to their appointed technical advisory committees and the testing contractors. However, scaling decisions can have an appreciable impact on school ratings. Using middle-school data from New York State, we examined the consistency of school ratings based on two…

  11. Report: EPA’s Contract Oversight and Controls Over Personal Computers Need Improvement

    EPA Pesticide Factsheets

    Report #11-P-0705, September 26, 2011. EPA paid the CTS contractor a total of $489,734 over an 11-month period for 3,343 seats—a standard seat includes a leased computer with accessories and technical support—not ordered by the Agency during the period.

  12. 48 CFR 227.7103-13 - Government right to review, verify, challenge and validate asserted restrictions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... contracting officer shall not challenge a contractor's assertion that a commercial item, component, or process... to development of the item, component or process. (2) Presumption regarding development exclusively... validation of asserted restrictions for technical data related to commercial items, and to major systems, on...

  13. 48 CFR 227.7103-13 - Government right to review, verify, challenge and validate asserted restrictions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... contracting officer shall not challenge a contractor's assertion that a commercial item, component, or process... to development of the item, component or process. (2) Presumption regarding development exclusively... validation of asserted restrictions for technical data related to commercial items, and to major systems, on...

  14. 48 CFR 227.7103-13 - Government right to review, verify, challenge and validate asserted restrictions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... contracting officer shall not challenge a contractor's assertion that a commercial item, component, or process... to development of the item, component or process. (2) Presumption regarding development exclusively... validation of asserted restrictions for technical data related to commercial items, and to major systems, on...

  15. 48 CFR 227.7103-13 - Government right to review, verify, challenge and validate asserted restrictions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... contracting officer shall not challenge a contractor's assertion that a commercial item, component, or process... to development of the item, component or process. (2) Presumption regarding development exclusively... validation of asserted restrictions for technical data related to commercial items, and to major systems, on...

  16. Contractors on the Battlefield: What Have We Signed Up For?

    DTIC Science & Technology

    1999-03-01

    How about contractors supporting the gathering and interpreting of data from the Joint Air Forces Control Center and feeding intelligence and...lawful), and not within the extremely restrictive category of levee en masse if they commit a combat act, (defined in the terms of the German manual as...personnel to do is to learn to interpret a contractual agreement literally, to assume nothing.”34 The contractor is authorized to accomplish only

  17. Summary Report - Inspections of DoD Facilities and Military Housing and Audits of Base Operations and Support Services Contracts

    DTIC Science & Technology

    2016-10-14

    not holding contractors accountable for poor performance while constructing and maintaining facilities. These systemic problems resulted in...portfolio was about $880 billion at the end of FY 2015. Between 2003 and 2008, 18 U.S. military and contractor personnel electrocution fatalities...maintenance of DoD facilities. For instance, Report No. DODIG-2013-099 stated that installations “lacked qualified Government or contractor electricians

  18. Plans for Assessing Contractor Performance for the Camp Lemonnier Base Operations Support Contract Needed Improvement

    DTIC Science & Technology

    2015-08-27

    ensure the functional assessment plans ( FAP ) for the three services contained all contractor work requiring assessment, measurable performance...review the FAPs after development and revisions to the FAPs , and did not require additional controls over the contractor assessment process in an...revised as follows: • Business Management System B-14.3 was updated to require the contract officer representative conduct a FAP review to ensure

  19. Analysis of Contractor Logistics Support for the P-8 Poseidon Aircraft

    DTIC Science & Technology

    2008-06-01

    15. NUMBER OF PAGES 103 14. SUBJECT TERMS Original Equipment Manufacturer, Contractor Logistics Support, P-8A Aircraft , 16. PRICE CODE 17...Communications Rack Mission Equipment Rack Galley G4 INMARSAT Antenna MAD Folding Stairs Crew Rest Observer Stations (2) CFM-56-7B 180 kVA IDG Engines (2...Poseidon Aircraft By: Shane Tallant, Scott Hedrick, and Michael Martin Advisors: Diana Petross Keebom Kang

  20. 48 CFR 970.5223-7 - Sustainable acquisition program.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Environmental Sustainability Coordinator or equivalent position. (g) The Contractor shall prepare and submit... Sustainability Coordinator at the supported facility. The Subcontractor will advise the Contractor if it is... coordinate its activities with and submit required reports through the Environmental Sustainability...

  1. 48 CFR 970.5223-7 - Sustainable acquisition program.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Environmental Sustainability Coordinator or equivalent position. (g) The Contractor shall prepare and submit... Sustainability Coordinator at the supported facility. The Subcontractor will advise the Contractor if it is... coordinate its activities with and submit required reports through the Environmental Sustainability...

  2. 48 CFR 970.5223-7 - Sustainable acquisition program.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Environmental Sustainability Coordinator or equivalent position. (g) The Contractor shall prepare and submit... Sustainability Coordinator at the supported facility. The Subcontractor will advise the Contractor if it is... coordinate its activities with and submit required reports through the Environmental Sustainability...

  3. 48 CFR 970.5223-7 - Sustainable acquisition program.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Environmental Sustainability Coordinator or equivalent position. (g) The Contractor shall prepare and submit... Sustainability Coordinator at the supported facility. The Subcontractor will advise the Contractor if it is... coordinate its activities with and submit required reports through the Environmental Sustainability...

  4. Transforming an EPA QA/R-2 quality management plan into an ISO 9002 quality management system.

    PubMed

    Kell, R A; Hedin, C M; Kassakhian, G H; Reynolds, E S

    2001-01-01

    The Environmental Protection Agency's (EPA) Office of Emergency and Remedial Response (OERR) requires environmental data of known quality to support Superfund hazardous waste site projects. The Quality Assurance Technical Support (QATS) Program is operated by Shaw Environmental and Infrastructure, Inc. to provide EPA's Analytical Operations Center (AOC) with performance evaluation samples, reference materials, on-site laboratory auditing capabilities, data audits (including electronic media data audits), methods development, and other support services. The new QATS contract awarded in November 2000 required that the QATS Program become ISO 9000 certified. In a first for an EPA contractor, the QATS staff and management successfully transformed EPA's QA/R-2 type Quality Management Plan into a Quality Management System (QMS) that complies with the requirements of the internationally recognized ISO 9002 standard and achieved certification in the United States, Canada, and throughout Europe. The presentation describes how quality system elements of ISO 9002 were implemented on an already existing quality system. The psychological and organizational challenges of the culture change in QATS' day-to-day operations will be discussed for the benefit of other ISO 9000 aspirants.

  5. Subaru FATS (fault tracking system)

    NASA Astrophysics Data System (ADS)

    Winegar, Tom W.; Noumaru, Junichi

    2000-07-01

    The Subaru Telescope requires a fault tracking system to record the problems and questions that staff experience during their work, and the solutions provided by technical experts to these problems and questions. The system records each fault and routes it to a pre-selected 'solution-provider' for each type of fault. The solution provider analyzes the fault and writes a solution that is routed back to the fault reporter and recorded in a 'knowledge-base' for future reference. The specifications of our fault tracking system were unique. (1) Dual language capacity -- Our staff speak both English and Japanese. Our contractors speak Japanese. (2) Heterogeneous computers -- Our computer workstations are a mixture of SPARCstations, Macintosh and Windows computers. (3) Integration with prime contractors -- Mitsubishi and Fujitsu are primary contractors in the construction of the telescope. In many cases, our 'experts' are our contractors. (4) Operator scheduling -- Our operators spend 50% of their work-month operating the telescope, the other 50% is spent working day shift at the base facility in Hilo, or day shift at the summit. We plan for 8 operators, with a frequent rotation. We need to keep all operators informed on the current status of all faults, no matter the operator's location.

  6. Monitored Geologic Repository Project Description Document

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    P. M. Curry

    2001-01-30

    The primary objective of the Monitored Geologic Repository Project Description Document (PDD) is to allocate the functions, requirements, and assumptions to the systems at Level 5 of the Civilian Radioactive Waste Management System (CRWMS) architecture identified in Section 4. It provides traceability of the requirements to those contained in Section 3 of the ''Monitored Geologic Repository Requirements Document'' (MGR RD) (YMP 2000a) and other higher-level requirements documents. In addition, the PDD allocates design related assumptions to work products of non-design organizations. The document provides Monitored Geologic Repository (MGR) technical requirements in support of design and performance assessment in preparing formore » the Site Recommendation (SR) and License Application (LA) milestones. The technical requirements documented in the PDD are to be captured in the System Description Documents (SDDs) which address each of the systems at Level 5 of the CRWMS architecture. The design engineers obtain the technical requirements from the SDDs and by reference from the SDDs to the PDD. The design organizations and other organizations will obtain design related assumptions directly from the PDD. These organizations may establish additional assumptions for their individual activities, but such assumptions are not to conflict with the assumptions in the PDD. The PDD will serve as the primary link between the technical requirements captured in the SDDs and the design requirements captured in US Department of Energy (DOE) documents. The approved PDD is placed under Level 3 baseline control by the CRWMS Management and Operating Contractor (M and O) and the following portions of the PDD constitute the Technical Design Baseline for the MGR: the design characteristics listed in Table 1-1, the MGR Architecture (Section 4.1), the Technical Requirements (Section 5), and the Controlled Project Assumptions (Section 6).« less

  7. 23 CFR 230.413 - Review reports.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... documentary evidence to support the determination of a contractor's or subcontractor's compliance status. (3... and sex in accordance with (iii) above. This shall be the data verified during the onsite. (vii) Identification of local unions involved with contractor, when applicable. (viii) Determination of compliance...

  8. 23 CFR 230.413 - Review reports.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... documentary evidence to support the determination of a contractor's or subcontractor's compliance status. (3... and sex in accordance with (iii) above. This shall be the data verified during the onsite. (vii) Identification of local unions involved with contractor, when applicable. (viii) Determination of compliance...

  9. 23 CFR 230.413 - Review reports.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... documentary evidence to support the determination of a contractor's or subcontractor's compliance status. (3... and sex in accordance with (iii) above. This shall be the data verified during the onsite. (vii) Identification of local unions involved with contractor, when applicable. (viii) Determination of compliance...

  10. 23 CFR 230.413 - Review reports.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... documentary evidence to support the determination of a contractor's or subcontractor's compliance status. (3... and sex in accordance with (iii) above. This shall be the data verified during the onsite. (vii) Identification of local unions involved with contractor, when applicable. (viii) Determination of compliance...

  11. Report on audit of Department of Energy`s contractor salary increase fund

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-04-04

    The Department of Energy (Department) uses contractors to operate its facilities and compensates contractor employees based on their skills, complexity of jobs, and work performance. Thirty-one of the Department`s major contractors reported a total payroll of $4.3 billion and $4.4 billion during 1994 and 1995, respectively. The 31 contractors also reported awarding salary increases of $18 million for 1994 and $200 million for 1995. The purpose of the audit was to review the process used to determine and approve the amount of salary increases for contractor employees. The specific audit objective was to determine whether salary increases received by contractormore » employees were in accordance with Departmental policies and procedures. The Department of Energy Acquisition Regulation (DEAR) requires that contractor salary actions be within specific limitations, supportable, and approved prior to incurrence of costs. In addition, the Secretary of Energy imposed a 1 year salary freeze on the merit portion of management and operating contractor employee salaries for each contractor`s Fiscal Year 1994 compensation year. However, a fund for promotions and adjustments was approved but limited to 0.5 percent of payroll for the year. A review of eight major contractors showed that six complied with the Department`s policies on salary increases. The other two gave salary increases that were not always in accordance with Departmental policies. This resulted in both contractors not fully complying with the pay freeze in 1994 and exceeding their salary increase fund budgets in 1995. If these two contractors had implemented Department and contract requirements and contracting officers had properly performed their contract administrative responsibilities concerning salary increase funds, both contractors would have frozen salary increases and would not have exceeded their annual budgets.« less

  12. Defense Management. DOD Needs to Reexamine Its Extensive Reliance on Contractors and Continue to Improve Management and Oversight

    DTIC Science & Technology

    2008-03-11

    guidance dealing with contractors who support deployed forces in October 2005. However, as we recently testified , DOD’s leadership needs to ensure...GAO-08-572T may be “ borderline inherently governmental.”14 We have also found problems with contractors having too much control at other...contract oversight personnel, lessons learned, and training of military commanders and contract oversight personnel. More recently, we testified that DOD’s

  13. Issues with Access to Acquisition Data and Information in the Department of Defense: A Closer Look at the Origins and Implementation of Controlled Unclassified Information Labels and Security Policy

    DTIC Science & Technology

    2016-12-01

    at a high cost and is protected by contractual agreements between vendors and the government. Yet indiscriminate labeling of information as...federally funded research and development centers [FFRDCs], information technology [IT] support, or other contractor support). Proprietary...con- tractor originators of the information (prime contractors and subcontractors), the government, and nongovernmental entities assisting the

  14. Issues with Access to Acquisition Data and Information in the Department of Defense: A Closer Look at the Origins and Implementation of Controlled Unclassified Information Labels and Security Policy

    DTIC Science & Technology

    2016-12-19

    at a high cost and is protected by contractual agreements between vendors and the government. Yet indiscriminate labeling of information as...federally funded research and development centers [FFRDCs], information technology [IT] support, or other contractor support). Proprietary...con- tractor originators of the information (prime contractors and subcontractors), the government, and nongovernmental entities assisting the

  15. War-gaming application for future space systems acquisition part 2: acquisition and bidding war-gaming modeling and simulation approaches for FFP and FPIF

    NASA Astrophysics Data System (ADS)

    Nguyen, Tien M.; Guillen, Andy T.

    2017-05-01

    This paper describes cooperative and non-cooperative static Bayesian game models with complete and incomplete information for the development of optimum acquisition strategies associated with the Program and Technical Baseline (PTB) solutions obtained from Part 1 of this paper [1]. The optimum acquisition strategies discussed focus on achieving "Affordability" by incorporating contractors' bidding strategies into the government acquisition strategies for acquiring future space systems. The paper discusses System Engineering (SE) frameworks, analytical and simulation approaches and modeling for developing the optimum acquisition strategies from both the government and contractor perspectives for Firm Fixed Price (FFP) and Fixed Price Incentive Firm (FPIF) contract types.

  16. Research and Technology 1995

    NASA Technical Reports Server (NTRS)

    1996-01-01

    This report selectively summarizes the NASA Lewis Research Center's research and technology accomplishments for fiscal year 1995. It comprises over 150 short articles submitted by the staff members of the technical directorates. The report is organized into six major sections: aeronautics, aerospace technology, space flight systems, engineering support, Lewis Research Academy, and technology transfer. A table of contents, an author index, and a list of NASA Headquarters program offices have been included to assist the reader in finding articles of special interest. This report is not intended to be a comprehensive summary of all research and technology work done over the past fiscal year. Most of the work is reported in Lewis-published technical reports, journal articles, and presentations prepared by Lewis staff members and contractors (for abstracts of these Lewis-authored reports, visit the Lewis Technical Report Server (LETRS) on the World Wide Web-http://letrs.lerc.nasa.gov/LeTRS/). In addition, university grants have enabled faculty members and graduate students to engage in sponsored research that is reported at technical meetings or in journal articles. For each article in this report, a Lewis contact person has been identified, and where possible, reference documents are listed so that additional information can be easily obtained. The diversity of topics attests to the breadth of research and technology being pursued and to the skill mix of the staff that makes it possible. For more information about Lewis' research, visit us on the World Wide web-http://www.lerc.nasa.gov.

  17. ISS Logistics Hardware Disposition and Metrics Validation

    NASA Technical Reports Server (NTRS)

    Rogers, Toneka R.

    2010-01-01

    I was assigned to the Logistics Division of the International Space Station (ISS)/Spacecraft Processing Directorate. The Division consists of eight NASA engineers and specialists that oversee the logistics portion of the Checkout, Assembly, and Payload Processing Services (CAPPS) contract. Boeing, their sub-contractors and the Boeing Prime contract out of Johnson Space Center, provide the Integrated Logistics Support for the ISS activities at Kennedy Space Center. Essentially they ensure that spares are available to support flight hardware processing and the associated ground support equipment (GSE). Boeing maintains a Depot for electrical, mechanical and structural modifications and/or repair capability as required. My assigned task was to learn project management techniques utilized by NASA and its' contractors to provide an efficient and effective logistics support infrastructure to the ISS program. Within the Space Station Processing Facility (SSPF) I was exposed to Logistics support components, such as, the NASA Spacecraft Services Depot (NSSD) capabilities, Mission Processing tools, techniques and Warehouse support issues, required for integrating Space Station elements at the Kennedy Space Center. I also supported the identification of near-term ISS Hardware and Ground Support Equipment (GSE) candidates for excessing/disposition prior to October 2010; and the validation of several Logistics Metrics used by the contractor to measure logistics support effectiveness.

  18. 75 FR 81209 - Information Collection; National Incident Support Stakeholder Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-27

    ... define best practices. Stakeholders include Forest Service employees, other Federal agencies, industry... goal of determining the acquisition method which is in the best interest of the Federal government, imposes a reasonable risk on the contractor, yet also motivates effective contractor performance. The...

  19. 48 CFR 9904.401-60 - Illustrations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... manufacturing overhead to be applied to an estimated direct labor base. He identifies the items included in his... performance 4. Contractor estimates a total dollar amount for engineering labor which includes disparate and significant elements or functions of engineering labor. Contractor does not provide supporting data...

  20. 48 CFR 9904.401-60 - Illustrations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... manufacturing overhead to be applied to an estimated direct labor base. He identifies the items included in his... performance 4. Contractor estimates a total dollar amount for engineering labor which includes disparate and significant elements or functions of engineering labor. Contractor does not provide supporting data...

  1. 48 CFR 9904.401-60 - Illustrations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... manufacturing overhead to be applied to an estimated direct labor base. He identifies the items included in his... performance 4. Contractor estimates a total dollar amount for engineering labor which includes disparate and significant elements or functions of engineering labor. Contractor does not provide supporting data...

  2. 48 CFR 4.703 - Policy.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... computer data, or in any other form, and other supporting evidence to satisfy contract negotiation... described in paragraph (a) of this section is maintained on a computer, contractors shall retain the computer data on a reliable medium for the time periods prescribed. Contractors may transfer computer data...

  3. 48 CFR 4.703 - Policy.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... computer data, or in any other form, and other supporting evidence to satisfy contract negotiation... described in paragraph (a) of this section is maintained on a computer, contractors shall retain the computer data on a reliable medium for the time periods prescribed. Contractors may transfer computer data...

  4. 48 CFR 4.703 - Policy.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... computer data, or in any other form, and other supporting evidence to satisfy contract negotiation... described in paragraph (a) of this section is maintained on a computer, contractors shall retain the computer data on a reliable medium for the time periods prescribed. Contractors may transfer computer data...

  5. 48 CFR 4.703 - Policy.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... computer data, or in any other form, and other supporting evidence to satisfy contract negotiation... described in paragraph (a) of this section is maintained on a computer, contractors shall retain the computer data on a reliable medium for the time periods prescribed. Contractors may transfer computer data...

  6. 48 CFR 4.703 - Policy.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... computer data, or in any other form, and other supporting evidence to satisfy contract negotiation... described in paragraph (a) of this section is maintained on a computer, contractors shall retain the computer data on a reliable medium for the time periods prescribed. Contractors may transfer computer data...

  7. 23 CFR 660.519 - Missile installations and facilities.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... facilities. Should damage occur to public highways as a result of construction activities, the contractor... the work performed. Claims shall be presented to the contractor for this extraordinary maintenance and... the contract terms, the claim with the required supporting documentation shall be presented to the...

  8. 23 CFR 660.519 - Missile installations and facilities.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... facilities. Should damage occur to public highways as a result of construction activities, the contractor... the work performed. Claims shall be presented to the contractor for this extraordinary maintenance and... the contract terms, the claim with the required supporting documentation shall be presented to the...

  9. Configuration Management Process Assessment Strategy

    NASA Technical Reports Server (NTRS)

    Henry, Thad

    2014-01-01

    Purpose: To propose a strategy for assessing the development and effectiveness of configuration management systems within Programs, Projects, and Design Activities performed by technical organizations and their supporting development contractors. Scope: Various entities CM Systems will be assessed dependent on Project Scope (DDT&E), Support Services and Acquisition Agreements. Approach: Model based structured against assessing organizations CM requirements including best practices maturity criteria. The model is tailored to the entity being assessed dependent on their CM system. The assessment approach provides objective feedback to Engineering and Project Management of the observed CM system maturity state versus the ideal state of the configuration management processes and outcomes(system). center dot Identifies strengths and risks versus audit gotcha's (findings/observations). center dot Used "recursively and iteratively" throughout program lifecycle at select points of need. (Typical assessments timing is Post PDR/Post CDR) center dot Ideal state criteria and maturity targets are reviewed with the assessed entity prior to an assessment (Tailoring) and is dependent on the assessed phase of the CM system. center dot Supports exit success criteria for Preliminary and Critical Design Reviews. center dot Gives a comprehensive CM system assessment which ultimately supports configuration verification activities.*

  10. Life support systems analysis and technical trades for a lunar outpost

    NASA Technical Reports Server (NTRS)

    Ferrall, J. F.; Ganapathi, G. B.; Rohatgi, N. K.; Seshan, P. K.

    1994-01-01

    The NASA/JPL life support systems analysis (LISSA) software tool was used to perform life support system analysis and technology trades for a Lunar Outpost. The life support system was modeled using a chemical process simulation program on a steady-state, one-person, daily basis. Inputs to the LiSSA model include metabolic balance load data, hygiene load data, technology selection, process operational assumptions and mission parameter assumptions. A baseline set of technologies has been used against which comparisons have been made by running twenty-two cases with technology substitutions. System, subsystem, and technology weights and powers are compared for a crew of 4 and missions of 90 and 600 days. By assigning a weight value to power, equivalent system weights are compared. Several less-developed technologies show potential advantages over the baseline. Solid waste treatment technologies show weight and power disadvantages but one could have benefits associated with the reduction of hazardous wastes and very long missions. Technology development towards reducing the weight of resupplies and lighter materials of construction was recommended. It was also recommended that as technologies are funded for development, contractors should be required to generate and report data useful for quantitative technology comparisons.

  11. Semiannual Technical Summary, 1 October 1990 - 31 March 1991 (Royal Norwegian Council for Scientific and Industrial Research)

    DTIC Science & Technology

    1991-05-01

    Ronal Njorwegian Council !,r ScrerithC arid Industrial RuseIarch R A YI~L ~ AD-A242 758 NORSAR Scientific Report No . 2-90/91 Semiannual Technical...Authorization T/9141/B/PKP ARPA Order No . 4138 AMD # 16 Program Code No . OF10 Name of Contractor Royal Norwegian Council for Scientific and Industrial ...PROCUREMENT INSTRUMENT IDENTIFICATION NUMBER ORGANIZATION Defense Advanced -- "’able) Contract No . F08606-89-C-0005 Pae~h rjsct A ..... 8c. ADDRESS (Ci-tytate

  12. One of the criteria for selecting a contractor for high-rise construction

    NASA Astrophysics Data System (ADS)

    Tuskaeva, Zalina; Tagirov, Timur

    2018-03-01

    The mechanisms for management of the building complex used and proposed to date do not always provide the required result in the assessment of the construction organization facilities. Therefore, the development of new effective methods for such an assessment is an urgent task especially in questions related to high-rise construction. The article formally sets the task of assessing the technical facilities of a construction organization. Due to the use of expert methods, the weighted values of the coefficients of local indicators for technical facilities are identified

  13. Outsourcing Cataloging, Authority Work, and Physical Processing: A Checklist of Considerations.

    ERIC Educational Resources Information Center

    Kascus, Marie A., Ed.; Hale, Dawn, Ed.

    Due to automation technology, financial restrictions, and resultant downsizing, library managers have increasingly relied on the services of contractors, rather than in-house staff, to accomplish different technical services operations. Contracted services may range from a small project for a selected group of materials to a large project for…

  14. 78 FR 6183 - Federal Acquisition Regulation; Federal Acquisition Circular 2005-65; Introduction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-29

    ... incorporated in the United States and then reincorporated in a tax haven. Item II--Extension of Sunset Date for... minimal economic impact on small businesses because the 2 percent excise tax is applied only to foreign...-011 Chambers. of Costs Associated with Foreign Contractor Excise Tax. V Technical Amendments...

  15. 10 CFR 784.12 - Terms and conditions of waivers.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... covering an invention or discovery which is not a Subject Invention and which is owned or controlled by the... asserted by the Contractor or its employees with respect to any invention or discovery made or conceived in... information regarding scientific or technical developments conceived or first actually reduced to practice in...

  16. 10 CFR 784.12 - Terms and conditions of waivers.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... covering an invention or discovery which is not a Subject Invention and which is owned or controlled by the... asserted by the Contractor or its employees with respect to any invention or discovery made or conceived in... information regarding scientific or technical developments conceived or first actually reduced to practice in...

  17. 10 CFR 784.12 - Terms and conditions of waivers.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... covering an invention or discovery which is not a Subject Invention and which is owned or controlled by the... asserted by the Contractor or its employees with respect to any invention or discovery made or conceived in... information regarding scientific or technical developments conceived or first actually reduced to practice in...

  18. 10 CFR 784.12 - Terms and conditions of waivers.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... covering an invention or discovery which is not a Subject Invention and which is owned or controlled by the... asserted by the Contractor or its employees with respect to any invention or discovery made or conceived in... information regarding scientific or technical developments conceived or first actually reduced to practice in...

  19. 48 CFR 27.406-3 - Major system acquisition.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... contracting officer shall review the technical data and the contractor's declaration relating to it to assure... procured by the Government and also relating to the design, development, or manufacture of products or processes offered or to be offered for sale to the public (except for such data as may be necessary for the...

  20. Technoeconomic analysis of conventional logging systems operating from stump to landing

    Treesearch

    Raymond L. Sarles; William G. Luppold; William G. Luppold

    1986-01-01

    Analyzes technical and economic factors for six conventional logging systems suitable for operation in eastern forests. Discusses financial risks and business implications for loggers investing in high-production, state-of-the-art logging systems. Provides logging contractors with information useful as a preliminary guide for selection of equipment and systems....

  1. Safety Issues at the Defense Production Reactors. A Report to the U.S. Department of Energy.

    ERIC Educational Resources Information Center

    National Academy of Sciences - National Research Council, Washington, DC. Commission on Physical Sciences, Mathematics, and Resources.

    This report provides an assessment of safety management, safety review, and safety methodology employed by the Department of Energy (DOE) and private contractors. Chapter 1, "The DOE Safety Framework," examines safety objectives for production reactors and processes to implement the objectives. Chapter 2, "Technical Issues,"…

  2. 48 CFR 52.227-17 - Rights in Data-Special Works.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... (CONTINUED) CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 52... information, regardless of form or the media on which it may be recorded. The term includes technical data and... practicable of any claim or suit, affords the Contractor an opportunity under applicable laws, rules, or...

  3. 48 CFR 52.227-17 - Rights in Data-Special Works.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... (CONTINUED) CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 52... information, regardless of form or the media on which it may be recorded. The term includes technical data and... practicable of any claim or suit, affords the Contractor an opportunity under applicable laws, rules, or...

  4. 48 CFR 52.227-17 - Rights in Data-Special Works.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... (CONTINUED) CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 52... information, regardless of form or the media on which it may be recorded. The term includes technical data and... practicable of any claim or suit, affords the Contractor an opportunity under applicable laws, rules, or...

  5. 48 CFR 52.227-17 - Rights in Data-Special Works.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... (CONTINUED) CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 52... information, regardless of form or the media on which it may be recorded. The term includes technical data and... practicable of any claim or suit, affords the Contractor an opportunity under applicable laws, rules, or...

  6. Report to the administrator by the NASA Aerospace Safety Advisory Panel on the Skylab program. Volume 1: Summary report. [systems management evaluation and design analysis

    NASA Technical Reports Server (NTRS)

    1973-01-01

    Contractor and NASA technical management for the development and manufacture of the Skylab modules is reviewed with emphasis on the following management controls: configuration and interface management; vendor control; and quality control of workmanship. A review of the modified two-stage Saturn V launch vehicle which focused on modifications to accommodate the Skylab payload; resolution of prior flight anomalies; and changes in personnel and management systems is presented along with an evaluation of the possible age-life and storage problems for the Saturn 1-B launch vehicle. The NASA program management's visibility and control of contractor operations, systems engineering and integration, the review process for the evaluation of design and flight hardware, and the planning process for mission operations are investigated. It is concluded that the technical management system for development and fabrication of the modules, spacecraft, and launch vehicles, the process of design and hardware acceptance reviews, and the risk assessment activities are satisfactory. It is indicated that checkout activity, integrated testing, and preparations for and execution of mission operation require management attention.

  7. The Department of Defense’s Use of Private Security Contractors in Iraq and Afghanistan: Background, Analysis, and Options for Congress

    DTIC Science & Technology

    2010-06-22

    Congress has generally accepted the concept of using unarmed contractors to carry out support functions in military operations, such as providing food and...countries where stability generally is not an issue. 3 According to one report, “Not since the 17th century has there been such a reliance on private...Institution has estimated that citizens of some 30 countries have worked as security contractors in Iraq.6 PSC employees are generally divided by

  8. Conversion of Low Quality Waste Heat to Electric Power with Small-Scale Organic Rankine Cycle (ORC) Engine/Generator Technology

    DTIC Science & Technology

    2016-06-01

    Allan Robichaux, DPW PWD GTMO and the management and staff of the GTMO on site contractor , Centerra. Page Intentionally Left Blank ii Table of...operations and maintenance contractor to ensure that data transfers are completed as required. Figure 4 shows the location of the ORC installation on MUSE...this issue with telephone support from CRM’s controls contractor (Winn-Marion, W-M); however, the problem remained unresolved as of Sept. 1 when

  9. Independent Orbiter Assessment (IOA): CIL issues resolution report, volume 1

    NASA Technical Reports Server (NTRS)

    Urbanowicz, Kenneth J.; Hinsdale, L. W.; Barnes, J. E.

    1988-01-01

    The results of the Independent Orbiter Assessment (IOA) of the Failure Modes and Effects Analysis (FMEA) and Critical Items List (CIL) are presented. This report contains IOA assessment worksheets showing resolution of outstanding IOA CIL issues that were summarized in the IOA FMEA/CIL Assessment Interim Report, dated 9 March 1988. Each assessment worksheet has been updated with CIL issue resolution and rationale. The NASA and Prime Contractor post 51-L FMEA/CIL documentation assessed is believed to be technically accurate and complete. No assessment issues remain that has safety implications. Volume 1 contain worksheets for the following sybsystems: Landing and Deceleration Subsystem; Purge, Vent and Drain Subsystem; Active Thermal Control and Life Support Systems; Crew Equipment Subsystem; Instrumentation Subsystem; Data Processing Subsystem; Atmospheric Revitalization Pressure Control Subsystem; Hydraulics and Water Spray Boiler Subsystem; and Mechanical Actuation Subsystem.

  10. Contractor Support on the Battlefield -- Increased Reliance Requires Commander’s Attention

    DTIC Science & Technology

    2006-05-16

    combatant commander. The consequence is contractors on the battlefield are governed by contract law , which then begs the question how applicable is... contract law on the battlefield? Command and Control Command and control is critical to our success on the battlefield, yet America’s military has

  11. Organic Versus Contractor Logistics Support For Depot-Level Repair: Factors That Drive Sub-Optimal Decisions

    DTIC Science & Technology

    2016-02-16

    Considerations in Using CLS or Organic Support Break-Even Analysis in the Decision Process When a business decision is made in an ideal environment, all costs...Line B). The break-even point (Point C) is the production quantity where the advantage moves to a different cost curve. For a business decision...the Services to provide regular reporting to them on contractor versus organic workload and money .1415 In sum, there are laws that mandate 50/50

  12. Status and Opportunities for Improving the Consistency of Technical Reference Manuals

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jayaweera, Tina; Velonis, Aquila; Haeri, Hossein

    Across the United States, energy-efficiency program administrators rely on Technical Reference Manuals (TRMs) as sources for calculations and deemed savings values for specific, well-defined efficiency measures. TRMs play an important part in energy efficiency program planning by providing a common and consistent source for calculation of ex ante and often ex post savings. They thus help reduce energy-efficiency resource acquisition costs by obviating the need for extensive measurement and verification and lower performance risk for program administrators and implementation contractors. This paper considers the benefits of establishing region-wide or national TRMs and considers the challenges of such undertaking due tomore » the difficulties in comparing energy savings across jurisdictions. We argue that greater consistency across TRMs in the approaches used to determine deemed savings values, with more transparency about assumptions, would allow better comparisons in savings estimates across jurisdictions as well as improve confidence in reported efficiency measure savings. To support this thesis, we review approaches for the calculation of savings for select measures in TRMs currently in use in 17 jurisdictions. The review reveals differences in the saving methodologies, technical assumptions, and input variables used for estimating deemed savings values. These differences are described and their implications are summarized, using four, common energy-efficiency measures as examples. Recommendations are then offered for establishing a uniform approach for determining deemed savings values.« less

  13. Ames Research Center publications, 1977

    NASA Technical Reports Server (NTRS)

    1979-01-01

    This bibliography lists 786 formal NASA publications, journal articles, books, chapters of books, patents, and contractor reports which appeared during 1977 or which were not included in previous annual bibliographies. Citations are arranged by directorate, type of publication, and author. Each NASA report is identified by a technical report and accession number to facilitate ordering. An author index is provided.

  14. 48 CFR 227.7103-10 - Contractor identification and marking of technical data to be furnished with restrictive markings.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... submitted as an attachment to the offer. If an offeror fails to submit the attachment or fails to complete the attachment in accordance with the requirements of the solicitation provision, such failure shall... restriction is not justified. The contract attachment shall provide the same information regarding...

  15. Annual Research Progress Report Number 11, 1 July 1975-30 June 1976.

    DTIC Science & Technology

    1976-07-01

    Herbert of Cherbury: A Preliminary Checklist .... ... ... ...................... 68 2. The Donne-Herbert Family Relationship ........ 68- - 3...Reflections in Organizational Strture and Managmnt Policies... ........................... 77 9. The Development of Aircraft and Doctrine in the Royal Flying...Recruit Quality and~ Its Relationship with Air Force Technical Traiin ... n ... ng ... 106 4. A Conceptual Model for Evaluating Contractor Management

  16. Methodology Report for the 1990 National Postsecondary Student Aid Study. Contractor Report. Technical Report.

    ERIC Educational Resources Information Center

    Shepherd, Jane; Malizio, Andrew G.

    The 1990 National Postsecondary Student Aid Study (NPSAS:90) is the second in a series of federally funded surveys of enrolled postsecondary students. Its key purpose is to portray accurately the characteristics of these students, particularly recipients of student aid. Results will answer questions about recipients and sources of federal and…

  17. B-WEST Regional Workforce Training Center. Building Workers Entering Skilled Trades. Employer Training Guide.

    ERIC Educational Resources Information Center

    Portland Community Coll., OR.

    This guide, which was developed during the B-WEST (Building Workers Entering Skilled Trades) project, includes materials for use in training and providing on-site consultations to contractors, managers, supervisors, office/technical staff, and others in two areas: diversity in the workplace and sexual harassment in the workplace. Part 1, which…

  18. 48 CFR 970.5227-12 - Patent rights-management and operating contracts, for-profit contractor, advance class waiver.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... fields of technology are exceptional circumstance subject inventions: (A) Uranium enrichment technology; (B) Storage and disposal of civilian high-level nuclear waste and spent fuel technology; and (C... a technical field or related to a task determined by the Department of Energy to be subject to an...

  19. 48 CFR 970.5227-12 - Patent rights-management and operating contracts, for-profit contractor, advance class waiver.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... fields of technology are exceptional circumstance subject inventions: (A) Uranium enrichment technology; (B) Storage and disposal of civilian high-level nuclear waste and spent fuel technology; and (C... a technical field or related to a task determined by the Department of Energy to be subject to an...

  20. 48 CFR 970.5227-12 - Patent rights-management and operating contracts, for-profit contractor, advance class waiver.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... fields of technology are exceptional circumstance subject inventions: (A) Uranium enrichment technology; (B) Storage and disposal of civilian high-level nuclear waste and spent fuel technology; and (C... a technical field or related to a task determined by the Department of Energy to be subject to an...

  1. Simulation of Subpixel Atmospherically Degraded Target Detectability in Cluttered Scenes

    DTIC Science & Technology

    2013-09-06

    Number: The scientific or technical validity of this Contract Report is entirely the responsibility of the Contractor and the contents do not necessarily...September 6th 2012 and September 6th 2013. Results: Significant and representative cases are modeled and results are presented in an annex of the...3 4 Modeling an image degraded by the atmosphere

  2. 78 FR 22366 - Proposed Information Collection (Technical Industry Standards) Activity: Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-15

    ... Underwriters Laboratory (UL) or the National Fire Protection Association. Contractor must furnish evidence to... item, such as the UL tag on an electrical cord or a tag on a fire-rated door. Items that do not meet the standards or not previously tested must come with a certificate from an acceptable laboratory...

  3. SUMMARY REPORT FOR THE NATIONAL ATMOSPHERIC DEPOSITION PROGRAM/NATIONAL TRENDS NETWORK (NADP/NTN) SITE VISITATION PROGRAM FOR THE PERIOD OCTOBER 1987 THROUGH SEPTEMBER 1988

    EPA Science Inventory

    The U.S Environmental Protection Agency (EPA) provides technical assistance to the NADP/NTN network through a site visitation program. esearch Triangle Institute, as contractor to EPA, conducts these visits. f deficiencies or nonstandard procedures are noted, the site operator an...

  4. Government-Industry Data Exchange Program (GIDEP)

    NASA Technical Reports Server (NTRS)

    Richards, E. T.

    1974-01-01

    The Government-Industry Data Exchange Program (GIDEP) was originated in 1959 by the Army, Navy, and Air Force Ballistic Missile Agencies. Known at that time as IDEP--Interservice Data Exchange Program--its intent was to eliminate duplicate testing of parts and components by disseminating pertinent test data among Department of Defense contractors and various government agencies. In 1966 both the National Aeronautics and Space Administration and the Canadian Military Electronics Standards Agency (CAMESA) recognized the value of the data provided by the program and became participants. Today, GIDEP provides the interchange of specialized technical data to all the military services, participating government contractors and numerous government agencies such as the Atomic Energy Commission, Federal Aviation Administration, Defense Supply Agency, and the Small Business Administration.

  5. Apollo Program Management, Kennedy Space Center, Florida. Volume 4

    NASA Technical Reports Server (NTRS)

    1968-01-01

    The evolution of the Kennedy Space Center as the launch organization for Apollo/ Saturn V involved the concurrent solution of numerous complex problems. A significant increase in manpower was involved. Large and complex checkout and launch facilities were to be designed and constructed. Expansion of operational capabilities required the establishment and integration of a Government-Contractor operational team. From an initial cadre of approximately 200 civil service personnel of the Army Ballistic Missile Agency, transferred to NASA in 1960 following its establishment, expansion to the present civil service level of 2,900 occurred in the last seven years. Established within NASA as a directorate of the Marshall Space Flight Center, KSC achieved center status in 1962. With its designation as a Center, KSC accomplished the development and staffing of an organization that could perform procurement, resources, financial, and other management requirements formerly provided by the parent organization. In addition to continuing launch operations for established programs, KSC undertook the design and construction of large, new, and unique launch facilities for Apollo/Saturn V. With the expansion of the civil service work force, KSC integrated contractor organizations employing 23,000 personnel at the Center to perform specific operational and support missions under the technical supervision and observation of the Government team. The management techniques, organizational concepts, and continuing efforts utilized to meet the Apollo goals and challenges are discussed in this document.

  6. TurboTech Technical Evaluation Automated System

    NASA Technical Reports Server (NTRS)

    Tiffany, Dorothy J.

    2009-01-01

    TurboTech software is a Web-based process that simplifies and semiautomates technical evaluation of NASA proposals for Contracting Officer's Technical Representatives (COTRs). At the time of this reporting, there have been no set standards or systems for training new COTRs in technical evaluations. This new process provides boilerplate text in response to interview style questions. This text is collected into a Microsoft Word document that can then be further edited to conform to specific cases. By providing technical language and a structured format, TurboTech allows the COTRs to concentrate more on the actual evaluation, and less on deciding what language would be most appropriate. Since the actual word choice is one of the more time-consuming parts of a COTRs job, this process should allow for an increase in quantity of proposals evaluated. TurboTech is applicable to composing technical evaluations of contractor proposals, task and delivery orders, change order modifications, requests for proposals, new work modifications, task assignments, as well as any changes to existing contracts.

  7. Technical skills requirement of Indonesian construction labors to work in Malaysia

    NASA Astrophysics Data System (ADS)

    Adi, Henny Pratiwi

    2017-03-01

    Labors skills is an important part of construction projects implementation. Suitability between the skills possessed by labors with the skills needed by user is required to increase employment opportunities. Malaysia is a country that using construction labors from Indonesia. This study aims to get the kind of technical skills required by users of Indonesian constructian labors in Malaysia and also the importance level of technical skills. Data collecting in this research was conducted through interviews and questionnaires on contractors in Malaysia. The next stage was determine the importance level of technical skills in work field of carpenter, bricklayer, plumber and painters. The importance level of technical skills analyzed using the Relative Importance Index (RII). The results showed that mastering the operation of both instruments either manually or electrically is the most importance in the technical skills. Therefore, an understanding of the types of equipment for work field and the manner of operation is need to had by Indonesian construction labors who will work in Malaysia.

  8. Maintaining the program balance, volumes 1 and 2

    NASA Technical Reports Server (NTRS)

    Finger, Harold

    1991-01-01

    In March of 1990, the NASA Administrator asked the Academy to perform a study to address the following questions: (1) has NASA contracted too much of its technical work; (2) has NASA's in-house technical capability eroded over time; (3) is in-house engineering and scientific work important to the development of scientists and engineers; and (4) is NASA still able to attract quality scientists and engineers. A panel from the Academy addressed each question separately and came up with the following recommendations: (1) prepare and issue guidance on technical functional areas reserved for in-house performance; (2) convert contracted technical functions to in-house performance if critical to agency programs; (3) provide policy guidance to the centers to retain in-house projects; (4) examine the project mix at each center against agency goals and objectives; (5) institute an annual critical review for all technical disciplines; (6) modify the agency's contractor accountability process; and (7) seek opportunities for greater delegation of resources and technical decision making.

  9. Payload specialist station study. Volume 3: Program study cost estimates. Part 1: Work breakdown structure

    NASA Technical Reports Server (NTRS)

    1976-01-01

    The work breakdown structure (WBS) for the Payload Specialist Station (PSS) is presented. The WBS is divided into two elements--PSS contractor and mission unique requirements. In accordance with the study ground rules, it is assumed that a single contractor, hereafter referred to as PSS Contractor will perform the following: (1) provide C and D hardware (MFDS and elements of MMSE), except for GFE; (2) identify software requirements; (3) provide GSE and ground test software; and (4) perform systems engineering and integration in support of the Aft Flight Deck (AFD) C and D concept. The PSS Contractor WBS element encompasses a core or standardized PSS concept. Payload peculiar C and D requirements identified by users will originate as a part of the WBS element mission unique requirements; these requirements will be provided to the PSS Contractor for implementation.

  10. Evaluation of a Participatory Ergonomics Intervention in Small Commercial Construction Firms

    PubMed Central

    Dale, Ann Marie; Jaegers, Lisa; Welch, Laura; Gardner, Bethany T.; Buchholz, Bryan; Weaver, Nancy; Evanoff, Bradley A.

    2017-01-01

    Background Work-related musculoskeletal disorders (WMSD) among construction workers remain high. Participatory ergonomics (PE) interventions that engage workers and employers in reducing work injury risks have shown mixed results. Methods Eight-six workers from seven contractors participated in a PE program. A logic model guided the process evaluation and summative evaluation of short term and intermediate impacts and long term outcomes from surveys and field records. Results Process measures showed good delivery of training, high worker engagement, and low contractor participation. Workers’ knowledge improved and workers reported changes to work practices and tools used; contractor provision of appropriate equipment was low (33%). No changes were seen in symptoms or reported physical effort. Conclusions The PE program produced many worker-identified ergonomic solutions, but lacked needed support from contractors. Future interventions should engage higher levels of the construction organizational system to improve contractor involvement for reducing WMSD. PMID:27094450

  11. None

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Traylor, T.D.; Hicks, S.C.

    1994-03-01

    Transportation Energy Research announces on a monthly basis the current worldwide research and development information available on energy-efficient, environmentally sound transportation technologies. Its purpose is to enhance the technology transfer efforts of the Department of Energy. This publication contains the abstracts of DOE reports, journal articles, conference papers, patents, theses, and monographs added to the Energy Science and Technology Database during the past month. Also included are US information obtained through acquisition programs or interagency agreements and international information obtained through the International Energy Agency`s Energy Technology Data Exchange or government-to-government agreements. The DOE Office of Transportation Technologies (OTT) managesmore » federal R&D programs aimed at improving transportation-sector energy efficiency. OTT currently supports activities in four major program areas: Electric and Hybrid Vehicles; Advanced Propulsion Systems; and magnetic levitation technology; Advanced Materials. DOE and DOE contractors can obtain copies for $4.00 per issue by using VISA, MasterCard, or OSTI deposit accounts. Contact the Office of Scientific and Technical Information, P.O. Box 62, Oak Ridge, TN 37831, Attention: Information Services. For further information, call (615) 576-8401. Public availability is by subscription from the US Department of Commerce, Technology Administration, National Technical Information Service, Springfield, VA 22161. Order PB94-900900.« less

  12. Effluent Management Facility Evaporator Bottom-Waste Streams Formulation and Waste Form Qualification Testing

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Saslow, Sarah A.; Um, Wooyong; Russell, Renee L.

    This report describes the results from grout formulation and cementitious waste form qualification testing performed by Pacific Northwest National Laboratory (PNNL) for Washington River Protection Solutions, LLC (WRPS). These results are part of a screening test that investigates three grout formulations proposed for wide-range treatment of different waste stream compositions expected for the Hanford Effluent Management Facility (EMF) evaporator bottom waste. This work supports the technical development need for alternative disposition paths for the EMF evaporator bottom wastes and future direct feed low-activity waste (DFLAW) operations at the Hanford Site. High-priority activities included simulant production, grout formulation, and cementitious wastemore » form qualification testing. The work contained within this report relates to waste form development and testing, and does not directly support the 2017 Integrated Disposal Facility (IDF) performance assessment (PA). However, this work contains valuable information for use in PA maintenance past FY 2017 and future waste form development efforts. The provided results and data should be used by (1) cementitious waste form scientists to further the understanding of cementitious leach behavior of contaminants of concern (COCs), (2) decision makers interested in off-site waste form disposal, and (3) the U.S. Department of Energy, their Hanford Site contractors and stakeholders as they assess the IDF PA program at the Hanford Site. The results reported help fill existing data gaps, support final selection of a cementitious waste form for the EMF evaporator bottom waste, and improve the technical defensibility of long-term waste form risk estimates.« less

  13. 48 CFR 52.225-19 - Contractor Personnel in a Designated Operational Area or Supporting a Diplomatic or Consular...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Contractor Personnel in a...-19 Section 52.225-19 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION (CONTINUED... military or civilian personnel separated from their unit or organization in an environment requiring them...

  14. 48 CFR 52.225-19 - Contractor Personnel in a Designated Operational Area or Supporting a Diplomatic or Consular...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 2 2011-10-01 2011-10-01 false Contractor Personnel in a...-19 Section 52.225-19 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION (CONTINUED... military or civilian personnel separated from their unit or organization in an environment requiring them...

  15. DoD Needs to Improve the Billing System for Health Care Provided to Contractors at Medical Treatment Facilities in Southwest Asia

    DTIC Science & Technology

    2012-06-27

    8866 (DSN 664-8866). Alice F. Carey Assistant Inspector General Readiness, Operations, and Support DISTRIBUTION: UNDER SECRETARY...medical or dental care is not authorized, and contractor personnel may not receive these services at MTFs unless specifically authorized under the

  16. 48 CFR 1845.7209-3 - Loss, damage, or destruction of Government property while in contractor's possession or control.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    .... (b) When physical inventories, consumption analyses, or other actions disclose consumption of... required to reach a valid and supportable conclusion as to the contractor's liability for the loss, damage... assure proper credit. If analysis of contract provisions and circumstances establishes that the loss...

  17. An engineering database management system for spacecraft operations

    NASA Technical Reports Server (NTRS)

    Cipollone, Gregorio; Mckay, Michael H.; Paris, Joseph

    1993-01-01

    Studies at ESOC have demonstrated the feasibility of a flexible and powerful Engineering Database Management System in support for spacecraft operations documentation. The objectives set out were three-fold: first an analysis of the problems encountered by the Operations team in obtaining and managing operations documents; secondly, the definition of a concept for operations documentation and the implementation of prototype to prove the feasibility of the concept; and thirdly, definition of standards and protocols required for the exchange of data between the top-level partners in a satellite project. The EDMS prototype was populated with ERS-l satellite design data and has been used by the operations team at ESOC to gather operational experience. An operational EDMS would be implemented at the satellite prime contractor's site as a common database for all technical information surrounding a project and would be accessible by the cocontractor's and ESA teams.

  18. Supplier Assessment System (SAS)

    NASA Technical Reports Server (NTRS)

    Dietrich, Kristen

    2016-01-01

    Background: Sponsored by NASA Headquarters; Charter - provide information to assist the quality assurance community in evaluating and determining supplier risk; Comprehensive on-line repository of supplier information; Available to approved civil service personnel from all NASA Centers, other U.S. Government Agencies, Prime Contractors, and NASA direct support contractors; User access to specific data types or documents is controlled as needed.

  19. 75 FR 7582 - Access by EPA Contractors to Information Claimed as Confidential Business Information (CBI...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-22

    ... subcontractor, Computer Sciences Corporation (CSC), of the same address, provide IT support services related to... Vista Computer Services, under Contract Number 68-W3-0032. From October 1, 1998 until March 31, 2004, the contractor was Vista Computer Services, under Contract Number 68-W-98-230. From April 1, 2004...

  20. Case Studies in Educational Performance Contracting. Part 3. Texarkana, Arkansas; Liberty-Eylau, Texas.

    ERIC Educational Resources Information Center

    Carpenter, Polly; And Others

    The Texarkana model of performance contracting consists of five major elements: (1) turnkeying of cost-effective new technology as a basic program goal, (2) use of a performance contract for instruction, (3) use of a management support contractor, (4) selection of the learning system contractor by formal competition, and (5) use of independent…

  1. Street to Navy Enlisted Sailor Costing

    DTIC Science & Technology

    2016-12-01

    Resources Assistant HRS hours HTS /DS hometown shipping/direct ship IT intensive training ITA Intermittent Test Administrators ITE instructional...GS (General Schedule) civilians, and an undisclosed number of contractors . NAVCRUITCOM administrative support personnel ranging from E-1 through E...A Commodore (O-6) commands each NAVCRUITREG. Contractors are utilized for various functions throughout the NAVCRUITCOM enterprise; there are

  2. Developing Effective Linkages between Job Corps and One-Stop Systems: A Technical Assistance Guide.

    ERIC Educational Resources Information Center

    Dickinson, Katherine; Soukamneuth, Sengsouvanh

    This document is intended to help Job Corps centers and Office of Acquisition Policy contractors establish linkages with one-stop systems. Chapter 1 summarizes the requirements for linkages between Job Corps and one-stop systems that are specified in the Workforce Investment Act (WIA) of 1998 and compares one-stop delivery systems before and under…

  3. High School and Beyond Transcripts Survey (1982). Data File User's Manual. Contractor Report.

    ERIC Educational Resources Information Center

    Jones, Calvin; And Others

    This data file user's manual documents the procedures used to collect and process high school transcripts for a large sample of the younger cohort (1980 sophomores) in the High School and Beyond survey. The manual provides the user with the technical assistance needed to use the computer file and also discusses the following: (1) sample design for…

  4. The Evaluation of Less-Lethal Weapons

    DTIC Science & Technology

    1977-12-01

    following contractor personnel made mijor contributions: W. Busty (Experimental Pathology Laboratories, Inc) A. Tiedemann. I r (AAI, Inc) L. Wiliiams ...matter, participated. The objectives of tile conference were: a. To review the problems and policy issues concerning nonlethal weapons for law enforcement...and related uses, and, b. to develop recommendations for research and development priorities for addressing these technical and policy issues . The

  5. 48 CFR 3452.227-73 - Limitations on the use or disclosure of Government-furnished information marked with restrictive...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... information, or software: Limitations on The Use Or Disclosure of Government-Furnished Information Marked With... 52.227-14). (b) Proprietary data, technical data, or computer software provided to the contractor as... permission of the party who owns the data, release, or disclose such data or software to any person. (2) GFI...

  6. 48 CFR 3452.227-73 - Limitations on the use or disclosure of Government-furnished information marked with restrictive...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... information, or software: Limitations on The Use Or Disclosure of Government-Furnished Information Marked With... 52.227-14). (b) Proprietary data, technical data, or computer software provided to the contractor as... permission of the party who owns the data, release, or disclose such data or software to any person. (2) GFI...

  7. 48 CFR 3452.227-73 - Limitations on the use or disclosure of Government-furnished information marked with restrictive...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... information, or software: Limitations on The Use Or Disclosure of Government-Furnished Information Marked With... 52.227-14). (b) Proprietary data, technical data, or computer software provided to the contractor as... permission of the party who owns the data, release, or disclose such data or software to any person. (2) GFI...

  8. 48 CFR 3452.227-73 - Limitations on the use or disclosure of Government-furnished information marked with restrictive...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... information, or software: Limitations on The Use Or Disclosure of Government-Furnished Information Marked With... 52.227-14). (b) Proprietary data, technical data, or computer software provided to the contractor as... permission of the party who owns the data, release, or disclose such data or software to any person. (2) GFI...

  9. REDUCED PROTECTIVE CLOTHING DETERMINATIONS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BROWN, R.L.

    2003-06-13

    This technical basis document defines conditions where reduced protective clothing can be allowed, defines reduced protective clothing, and documents the regulatory review that determines the process is compliant with the Tank Farm Radiological Control Manual (TFRCM) and Title 10, Part 835, of the Code of Federal Regulations (10CFR835). The criteria, standards, and requirements contained in this document apply only to Tank Farm Contractor (TFC) facilities.

  10. Proceedings of the DOE chemical/hydrogen energy contractor review systems

    NASA Technical Reports Server (NTRS)

    1978-01-01

    Chemical/hydrogen energy system contracts were reviewed. The review served as an effective means to (1) give all contracts an insight into the background and objectives of thirty-nine hydrogen-related tasks, (2) show the status of the studies or technical effort, (3) relate any problems that had impeded the progress, and (4) state projected solutions for resolving the identified problems.

  11. Elucidation of Inflammation Processes Exacerbating Neuronal Cell Damage to the Retina and Brain Visual Centers as Quest for Therapeutic Drug Targets in Rat Model of Blast Overpressure Wave Exposure

    DTIC Science & Technology

    2016-10-01

    Righting Reflex of rats following double blast exposure. 0 4 8 12 16 20 R ig ht in g Re fle x (m in ut es ) PLACEBO FISH OIL Total Lived Died...experiments. Funding Support: Geneva Foundation contractor – WRAIR Name: Joseph B. Long, Ph.D. Project Role: Co-Investigator – WRAIR Researcher...Funding Support: Clinical Research Management contractor Name: Andrew B. Batuure Project Role: Technician - WRAIR Researcher Identifier (e.g. ORCID

  12. Using Heuristics for Supportability Analysis of Adaptive Weapon Systems in Combat

    DTIC Science & Technology

    2017-01-01

    a n/a Customer Requirements Im p o rt an ce w ei g ht f ac to r F o rc e to o p en E xt er na l d im en si o ns C D p o si ti o ni ng f ea tu...usually include Contractor Logistics Support (CLS), and the contract structure normally incentivizes CLS to exceed the KPP Operational Readiness...adaptive baseline, a viable plan for maximizing availability and reducing costs would involve an early design effort for replacing contractor maintenance

  13. Geochemical study of groundwater at Sandia National Laboratories/New Mexico and Kirtland Air Force Base

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) and its contractor, Rust Geotech, support the Kirtland Area Office by assisting Sandia National Laboratories/New Mexico (Sandia/NM) with remedial action, remedial design, and technical support of its Environmental Restoration Program. To aid in determining groundwater origins and flow paths, the GJPO was tasked to provide interpretation of groundwater geochemical data. The purpose of this investigation was to describe and analyze the groundwater geochemistry of the Sandia/NM Kirtland Air Force Base (KAFB). Interpretations of groundwater origins are made by using these data and the results of {open_quotes}mass balance{close_quotes} and {open_quotes}reactionmore » path{close_quote} modeling. Additional maps and plots were compiled to more fully comprehend the geochemical distributions. A more complete set of these data representations are provided in the appendices. Previous interpretations of groundwater-flow paths that were based on well-head, geologic, and geochemical data are presented in various reports and were used as the basis for developing the models presented in this investigation.« less

  14. Alternatives Analysis Amchitka Island Mud Pit Cap Repair, Amchitka, Alaska January 2016

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Darr, Paul S.

    2016-01-01

    The U.S. Department of Energy (DOE) Office of Legacy Management (LM) manages the Nevada Offsites program, which includes a series of reclaimed drilling mud impoundments on Amchitka Island, Alaska (Figure 1). Navarro Research and Engineering, Inc. is the Legacy Management Support contractor (the Contractor) for LM. The Contractor has procured Tetra Tech, Inc. to provide engineering support to the Amchitka mud pit reclamation project. The mud pit caps were damaged during a 7.9-magnitude earthquake that occurred in 2014. The goals of the current project are to investigate conditions at the mud pit impoundments, identify feasible alternatives for repair of themore » cover systems and the contents, and estimate relative costs of repair alternatives. This report presents descriptions of the sites and past investigations, existing conditions, summaries of various repair/mitigation alternatives, and direct, unburdened, order-of-magnitude (-15% to +50%) associated costs.« less

  15. Evaluation of a participatory ergonomics intervention in small commercial construction firms.

    PubMed

    Dale, Ann Marie; Jaegers, Lisa; Welch, Laura; Gardner, Bethany T; Buchholz, Bryan; Weaver, Nancy; Evanoff, Bradley A

    2016-06-01

    Work-related musculoskeletal disorders (WMSD) among construction workers remain high. Participatory ergonomics (PE) interventions that engage workers and employers in reducing work injury risks have shown mixed results. Eight-six workers from seven contractors participated in a PE program. A logic model guided the process evaluation and summative evaluation of short-term and intermediate impacts and long-term outcomes from surveys and field records. Process measures showed good delivery of training, high worker engagement, and low contractor participation. Workers' knowledge improved and workers reported changes to work practices and tools used; contractor provision of appropriate equipment was low (33%). No changes were seen in symptoms or reported physical effort. The PE program produced many worker-identified ergonomic solutions, but lacked needed support from contractors. Future interventions should engage higher levels of the construction organizational system to improve contractor involvement for reducing WMSD. Am. J. Ind. Med. 59:465-475, 2016. © 2016 Wiley Periodicals, Inc. © 2016 Wiley Periodicals, Inc.

  16. Information Technology and the Human Research Facility

    NASA Technical Reports Server (NTRS)

    Klee, Margaret

    2002-01-01

    This slide presentation reviews how information technology supports the Human Research Facility (HRF) and specifically the uses that contractor has for the information. There is information about the contractor, the HRF, some of the experiments that were performed using the HRF on board the Shuttle, overviews of the data architecture, and software both commercial and specially developed software for the specific experiments.

  17. 23 CFR Appendix C to Subpart A of... - Federal-Aid Highway Contractors Annual EEO Report (Form PR-1391)

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 23 Highways 1 2012-04-01 2012-04-01 false Federal-Aid Highway Contractors Annual EEO Report (Form PR-1391) C Appendix C to Subpart A of Part 230 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF... Construction Contracts (Including Supportive Services) Pt. 230, Subpt. A, App. C Appendix C to Subpart A of...

  18. Panel to review EOSDIS plans

    NASA Technical Reports Server (NTRS)

    1994-01-01

    Formed in Jan. 1992, the Panel to Review EOSDIS Plans was charged with advising NASA on its plans for developing the Earth Observing System (EOS) Data and Information System (EOSDIS). Specifically, the panel was asked to do the following: assess the validity of the engineering and technical underpinnings of the EOSDIS; assess its potential value to scientific users; suggest how technical risk can be minimized; and assess whether current plans are sufficiently resilient to be adaptable to changing technology and requirements such as budget environments, data volumes, new users, and new databases. The panel completed an interim report (Addendum A) and transmitted it to NASA and other interested parties in the government on 9 Apr. 1992. Because of a delay in NASA's plans to select the contractor for EOSDIS, the panel was not able to complete its review of the program according to the original government request. With the issuance of a letter report (Addendum B) on 28 Sep. 1992, the panel became inactive until such time as NASA could release the details of the contractor's proposed architecture, schedule, and costs for developing EOSDIS. In early 1993, NASA awarded the contract for the EOSDIS Core System (ECS). On 20 Apr. 1993, NASA asked the panel to reconvene to do the following: ( 1) complete its review of NASA's approach to the EOSDIS architecture and implementation; (2) appraise NASA's responses to the panel's previous recommendations; and (3) review the planning for EOSDIS in the context of NASA's role in the Global Change Data and Information System (GCDIS) implementation plan. To respond to the NASA charge, the panel met three times in 1993 including sessions with NASA officials and the EOSDIS contractor. In addition, several of the panel members visited individual Distributed Active Archive Centers (DAAC's) to obtain additional views of EOSDIS. The panel has now obtained substantial information on the EOSDIS budget, contractor work program, and current baseline architecture that was not previously available, due to procurement restrictions. This report presents the panel's findings and recommendations based on this additional information.

  19. Geospace Plasma Dynamics Laboratory Annual Task Report (FY11)

    DTIC Science & Technology

    2012-03-01

    Site Contractors: Nagendra Singh, Ph.D., Physicist , 0.5 MY Neil Grossbard, M.S., Mathematician , 0.7 MY Visitors: Publications: Articles in...PhD Project Manager Division Chief, RVB This report is published in the interest of scientific and technical...Annual Task Report (FY11) 5c. PROGRAM ELEMENT NUMBER 61102F 6. AUTHOR(S) 5d. PROJECT NUMBER 2311 Daniel Ober 5e. TASK NUMBER

  20. Acquisition Workforce Strategy: The Challenge Department of Defense (DoD) Faces to Improve its Acquisition Workforce

    DTIC Science & Technology

    2011-12-01

    Personnel Trends Relevant to Policy, 1993–2006. Santa Monica, CA: RAND Corporation/TR-572-OSD, by Gates, Susan M., Edward G. Keating , Adria D...settlement of contracts and subcontracts. Duties include evaluating information about contractor economic assertions, comparing those assertions to...Quality, and Manufacturing Acquisition-related manufacturing and production duties vary greatly in managerial , administrative, and technical

Top