2006-05-30
implementation Final Report 4 TECHNICAL PLAN AND RESULTS Task 1: Initiate the Project Management System Two senior NGSS production management...1 Technical Plan and Results...Third the system is hosted on a handheld unit which provides the foremen with an efficient daily planning tool. The Pilot System which entails
NASA Technical Reports Server (NTRS)
Bridges, James
2007-01-01
At this, the first year-end meeting of the Fundamental Aeronautics Program, an overview of the Airport Noise discipline of the Supersonics Project leads the presentation of technical plans and achievements in this area of the Project. The overview starts by defining the Technical Challenges targeted by Airport Noise efforts, and the Approaches planned to meet these challenges. These are fleshed out in Elements, namely Prediction, Diagnostics, and Engineering, and broken down into Tasks. The Tasks level is where individual researchers' work is defined and from whence the technical presentations to follow this presentation come. This overview also presents the Milestones accomplished to date and to be completed in the next year. Finally, the NASA Research Announcement cooperative agreement activities are covered and tied to the Tasks and Milestones.
FY 1987 current fiscal year work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This Current Year Work Plan presents a detailed description of the activities to be performed by the Joint Integration Office during FY87. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance, task monitoring, informationmore » gathering and task reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of program status reports for DOE. Program Analysis is performed by the JIO to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. This work plan includes: system analyses, requirements analyses, interim and procedure development, legislative and regulatory analyses, dispatch and traffic analyses, and data bases.« less
Differences in Writers' Initial Task Representations. Technical Report No. 35.
ERIC Educational Resources Information Center
Carey, Linda; And Others
An exploratory study investigated how writers represent their task to themselves before beginning to write. Using data from verbal protocols, the initial plans of 12 writers (5 experts and 7 student writers) who were working on an expository writing task were examined. The protocols were coded for types of planning. Independent measures of the…
Western Tier Trichloroethylene Investigation Technical Plan. Version 3. 1
1987-10-01
07p-o018.4 - 7’i.j -s 7,ze Ns vý-c~~f 0MB to.0 o,*%18 .. ý’ *. 4 -, I **5 1 "a! *- " -- .e..~’-!:c -~~ ’%as-ý9Ct, :C I. AUEENCY JSE ONLY .. eve DiarK...OBJECTIVES OF TASK 38 ARE TO: 1 . DETERMINE THE SOURCE(S) OF TRCLE IN THE WESTERN TIER 2. FOR EACH SOURCE, DEFINE THE CONTAMINANT PLUME 3. ESTIMATE THE...e. I TASK 38 TECHNICAL PLAN I TABLE OF CONTENTS i Sectio PA 1.0 INTRODUCTION 1 - 1 1 1.1 Background 1 - 1 1.2 Technical ADproach 1 -2 1.3 Areas to be
Luo, Chewe; Hirnschall, Gottfried; Rodrigues, Jessica; Romano, Sostena; Essajee, Shaffiq; Rogers, Braeden; McCarthy, Elizabeth; Mwango, Albert; Sangrujee, Nalinee; Adler, Michelle R; Houston, James C; Langa, Judite O; Urso, Marilena; Bolu, Omotayo; Tene, Gilbert; Elat Nfetam, Jean B; Kembou, Etienne; Phelps, Benjamin R
2017-05-01
While the Interagency Task Team on the Prevention and Treatment of HIV Infection in Pregnant Women, Mothers, and Children (IATT) partnership existed before the Global Plan Towards the Elimination of New HIV Infections Among Children by 2015 and Keeping Their Mothers Alive (Global Plan), its reconfiguration was critical to coordinating provision of technical assistance that positively influenced country decision-making and program performance. This article describes how the Global Plan anchored the work of the IATT and, in turn, how the IATT's technical assistance helped to accelerate achievement of the Global Plan targets and milestones. The technical assistance that will be discussed addressed a broad range of priority actions and milestones described in the Global Plan: (1) planning for and implementing Option B+; (2) strengthening monitoring and evaluation systems; (3) translating evidence into action and advocacy; and (4) promoting community engagement. This article also reviews the ongoing challenges and opportunities of providing technical assistance in a rapidly evolving environment that calls for ever more flexible and contextualized responses. The effectiveness of technical assistance facilitated by the IATT was defined by its timeliness, evidence base, and unique global perspective that built on the competencies of its partners and promoted synergies across program areas. Reaching the final goal of eliminating vertical transmission of HIV infection and achieving an AIDS-free generation in countries with the highest HIV burden requires that the IATT partnership and technical assistance remain responsive to country-specific needs while aligning with the current programmatic reality and new global goals such as the Sustainable Development Goals and 90-90-90 targets.
Science and Engineering Technical Assessments (SETA) Program
NASA Technical Reports Server (NTRS)
Huy, Frank
2000-01-01
This document provides a project plan for the D.N. American response to Modification #1 to Contract Task Order #13 - Program Maintenance and Logistics for the Science and Engineering Technical Assessments (SETA) contract.
Goddard Geophysical and Astronomical Observatory
NASA Technical Reports Server (NTRS)
Covey, Rawland; Kodak, Charles
1999-01-01
This report summarizes the technical parameters and the technical staff of the VLBI system at GGAO. It also gives an overview of VLBI activities during the previous year. The outlook lists the tasks planned for 1999.
Technical Report on Manpower Planning. Technical Group Report No. 7.
ERIC Educational Resources Information Center
Montana Commission on Post-Secondary Education, Helena.
The report is one of a series containing data and recommendations relevant to the task of developing future plans for Montana's post-secondary education. A brief introduction outlines the methods used in gathering information on manpower needs, and is followed by a review and summarization of the data collected, including a description, analysis,…
NASA Technical Reports Server (NTRS)
Kirsch, Paul J.; Hayes, Jane; Zelinski, Lillian
2000-01-01
This special case study report presents the Science and Engineering Technical Assessments (SETA) team's findings for exploring the correlation between the underlying models of Advanced Risk Reduction Tool (ARRT) relative to how it identifies, estimates, and integrates Independent Verification & Validation (IV&V) activities. The special case study was conducted under the provisions of SETA Contract Task Order (CTO) 15 and the approved technical approach documented in the CTO-15 Modification #1 Task Project Plan.
Effectiveness of Science Tasks and Plans for Siberian Scholars.
ERIC Educational Resources Information Center
Marchuk, G. I.
1972-01-01
Science and Technology research plans formulated for the Siberian Department of the U.S.S.R. Academy of Sciences are analyzed in this article to illustrate the tasks of scholars, workers, and engineering and technical personnel in the fulfillment of the 24th party congress resolutions The hypothesis of developing Siberia and the Far East up to the…
NASA Technical Reports Server (NTRS)
Wilkinson, W. H.; Kirkhart, F. P.; Kistler, C. W.; Duckworth, W. H.; Ungar, E. W.; Foster, E. L.
1970-01-01
Technical problems of design and flight qualification of the proposed classes of surface insulation materials and leading edge materials were reviewed. A screening test plan, a preliminary design data test plan and a design data test plan were outlined. This program defined the apparent critical differences between the surface insulators and the leading edge materials, structuring specialized screening test plans for each of these two classes of materials. Unique testing techniques were shown to be important in evaluating the structural interaction aspects of the surface insulators and a separate task was defined to validate the test plan. In addition, a compilation was made of available information on proposed material (including metallic TPS), previous shuttle programs, pertinent test procedures, and other national programs of merit. This material was collected and summarized in an informally structured workbook.
Visual Knowledge in Tactical Planning: Preliminary Knowledge Acquisition Phase 1 Technical Report
1990-04-05
MANAGEMENT INFORMATION , COMMUNICATIONS, AND COMPUTER SCIENCES Visual Knowledge in Tactical Planning: Preliminary Knowledge Acquisition Phase I Technical...perceived provides information in multiple modalities and, in fact, we may rely on a non-verbal mode for much of our understanding of the situation...some tasks, almost all the pertinent information is provided via diagrams, maps, znd other illustrations. Visual Knowledge Visual experience forms a
Aging Study Of EPDM O-Ring Material For The H1616 Shipping Package - Three Year Status
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stefek, T.; Daugherty, W.; Skidmore, E.
This is a 3-year status report for tasks carried out per Task Technical Plan SRNL-STI-2011-00506. A series of tasks/experiments were performed at the Savannah River National Laboratory (SRNL) to monitor the aging performance of ethylene propylene diene monomer (EPDM) O-rings used in the H1616 shipping package. The test data provide a technical basis to extend the annual maintenance of the H1616 shipping package to three years and to predict the life of the EPDM O-rings at the bounding service conditions.
Space station systems technology study (add-on task). Volume 3: Technology advancement program plan
NASA Technical Reports Server (NTRS)
1985-01-01
Program plans are given for an integrating controller for space station autonomy as well as for controls and displays. The technical approach, facility requirements and candidate facilities, development schedules, and resource requirements estimates are given.
Freight Advanced Traveler Information System (FRATIS) : Dallas-Fort Worth demonstration plan.
DOT National Transportation Integrated Search
2013-06-01
This document describes the Demonstration Plan for the FRATIS system. The demonstration component of this task will serve to test the technical feasibility of the FRATIS prototype while also facilitating the collection of baseline and performance dat...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rosenthal, A
Southwest Technology Development Institute (SWTDI), an independent, university-based research institute, has been the operator of the Southwest Region Photovoltaic Experiment Station (SWRES) for almost 30 years. The overarching mission of SWTDI is to position PV systems and solar technologies to become cost-effective, major sources of energy for the United States. Embedded in SWTDI's general mission has been the more-focused mission of the SWRES: to provide value added technical support to the DOE Solar Energy Technologies Program (SETP) to effectively and efficiently meet the R&D needs and targets specified in the SETP Multi-Year Technical Plan. : The DOE/SETP goals of growingmore » U.S. PV manufacturing into giga-watt capacities and seeing tera-watt-hours of solar energy production in the U.S. require an infrastructure that is under development. The staff of the SWRES has supported DOE/SETP through a coherent, integrated program to address infrastructural needs inhibiting wide-scale PV deployment in three major technical categories: specialized engineering services, workforce development, and deployment facilitation. The SWRES contract underwent three major revisions during its five year period-of- performance, but all tasks and deliverables fell within the following task areas: Task 1: PV Systems Assistance Center 1. Develop a Comprehensive multi-year plan 2. Provide technical workforce development materials and workshops for PV stakeholder groups including university, professional installers, inspectors, state energy offices, Federal agencies 3. Serve on the NABCEP exam committee 4. Provide on-demand technical PV system design reviews for U.S. PV stakeholders 5. Provide PV system field testing and instrumentation, technical outreach (including extensive support for the DOE Market Transformation program) Task 2: Design-for-Manufacture PV Systems 1. Develop and install 18 kW parking carport (cost share) and PV-thermal carport (Albuquerque) deriving and publishing lessons learned Task 3: PV Codes and Standards 1. Serve as the national lead for development and preparation of all proposals (related to PV) to the National Electrical Code 2. Participate in the Standards Technical Panels for modules (UL1703) and inverters (UL1741) Task 4: Assess Inverter Long Term Reliability 1. Install and monitor identical inverters at SWRES and SERES 2. Operate and monitor all inverters for 5 years, characterizing all failures and performance trends Task 5: Test and Evaluation Support for Solar America Initiative 1. Provide test and evaluation services to the National Laboratories for stage gate and progress measurements of SAI TPP winners« less
Power system restoration - A task force report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Adibi, M.; Clelland, P.; Link, L.
1987-05-01
The IEEE PES System Operation Subcommittee has established the Power System Restoration Task Force to: review operating practices, conduct a literature search, prepare relevant glossaries and bibliographies, and promote information exchange through technical papers. This is the first report of the Task Force. The problem of bulk power system restoration following a complete or partial collapse is practically as old as the electric utility industry itself. Many electric utilities have developed over the years system restoration schemes that meet the needs of their particular systems. These plans provide a great deal of insight into how the restorative process is viewedmore » by operating and planning personnel and what concerns and constraints any plan must operate under.« less
Tasks completed by nursing members of a teaching hospital Medical Emergency Team.
Topple, Michelle; Ryan, Brooke; Baldwin, Ian; McKay, Richard; Blythe, Damien; Rogan, John; Radford, Sam; Jones, Daryl
2016-02-01
To assess tasks completed by intensive care medical emergency team nurses. Prospective observational study. Australian teaching hospital. Nursing-related technical and non-technical tasks and level of self-reported confidence and competence. Amongst 400 calls, triggers and nursing tasks were captured in 93.5% and 77.3% of cases, respectively. The median patient age was 73 years. The four most common triggers were hypotension (22.0%), tachycardia (21.1%), low SpO2 (17.4%), and altered conscious state (10.1%). Non-technical skills included investigation review (33.7%), history acquisition (18.4%), contribution to the management plan (40.5%) and explanation to bedside nurses (78.3%), doctors (13.6%), allied health (3.9%) or patient/relative (39.5%). Technical tasks included examining the circulation (32%), conscious state (29.4%), and chest (26.5%). Additional tasks included adjusting oxygen (23.9%), humidification (8.4%), non-invasive ventilation (6.5%), performing an ECG (22%), and administrating fluid as a bolus (17.5%) or maintenance (16, 5.2%), or medication as a statim dose (16.8%) or infusion (5.2%). Self-reported competence and confidence appeared to be high overall amongst our MET nurses. Our findings provide important information on the tasks completed by Medical Emergency Team nurses and will guide future training. Copyright © 2015 Elsevier Ltd. All rights reserved.
INTERACTIVE PLANNING TOOL FOR SUSTAINABLE URBAN PLANNING IN A BUILT, URBAN COMMUNITY
Technical Challenge to Sustainability: The primary goal for this project is to initiate a unique process to begin the task of redesigning the municipal zoning ordinances for the Borough of Dormont, Pennsylvania. This process will utilize conventional planni...
Conservation Task Force Report on Education and Training. Draft Copy.
ERIC Educational Resources Information Center
Department of Energy, Washington, DC. Educational Programs Div.
Several months ago a planning session was held during which representatives of several colleges and universities shared their plans and strategies for energy conservation education. This publication contains reports from five community colleges, two universities, and one technical institute about how they have applied energy conservation and…
NASA's 2004 Hall Thruster Program
NASA Technical Reports Server (NTRS)
Jacobson, David T.; Manzella, David H.; Hofer, Richard R.; Peterson, Peter Y.
2004-01-01
An overview of NASA's Hall thruster research and development tasks conducted during fiscal year 2004 is presented. These tasks focus on: raising the technology readiness level of high power Hall thrusters, developing a moderate-power/ moderate specific impulse Hall thruster, demonstrating high-power/high specific impulse Hall thruster operation, and addressing the fundamental technical challenges of emerging Hall thruster concepts. Programmatic background information, technical accomplishments and out year plans for each program element performed under the sponsorship of the In-Space Transportation Program, Project Prometheus, and the Energetics Project are provided.
Hazardous waste management at the local level; The Anchorage, Alaska experience
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wigglesworth, D.
1989-07-01
The need to manage hazardous wastes in the municipality of Anchorage, Alaska, has become increasingly evident in recent years. A task force, representing a broad cross-section of the community, was appointed by the mayor to develop a waste management plan that would address community concerns. Between 1984 and 1986, the Anchorage Hazardous Waste Task Force, supported by municipal staff, local consultants and volunteers from the community developed a plan emphasizing local responsibility and pollution prevention, using management capabilities and technical assistance. This paper describes the development of a non-regulatory hazardous waste management program in Anchorage, Alaska. Plan elements, program fundingmore » and the key role of the local Hazardous Waste Task Force are discussed.« less
FY 1986 current fiscal year work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office/RI during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance development, taskmore » monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. System models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.« less
DOT National Transportation Integrated Search
1997-07-18
On April 28, 1996 the White House issued the Department of Transportation (DOT) : Action Plan to Address Vessel and Environmental Safety in Puget Sound-Area Waters. : The Action Plan outlines several related tasks, the first stage of which was to : r...
Power system restoration - A task force report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Adibi, M.; Clelland, P.; Fink, L.
1986-01-01
The IEEE PES System Operation Subcommittee has established the Power System Restoration Task Force to: review operating practices, conduct a literature search, prepare relevant glossaries and bibliographies, and promote information exchange through technical papers. This is the first report of the Task Force. The problem of bulk power system restoration following a complete or partial collapse is practically as old as the electric utility industry itself. Many electric utilities have developed over the years system restoration schemes that meet the needs of their particular systems. These plans provide a great deal of insight into how the restorative process is viewedmore » by operating and planning personnel and what concerns and constraints any plan must operate under. The body of the report consists of notes prepared by members of the Task Force. It should not be interred that a complete reporting on Power System Restoration is undertaken here. The intent is to report upon work of the Task Force to date. The report also reviews several different restoration plans and shows their common concerns and constraints.« less
Rice scene radiation research plan
NASA Technical Reports Server (NTRS)
Heilman, J.
1982-01-01
Data requirements, tasks to be accomplished, and the technical approaches to be used in identifying the characteristics of rice for crop inventories are listed as well as methods for estimating crop development and assessing its conditions.
Modular space station phase B extension period executive summary
NASA Technical Reports Server (NTRS)
Tischler, A. A.; Could, C. L.
1972-01-01
A narrative summary is presented of technical, programmatic, and planning information developed during the space station definition study extension period. The modular space station is emphasized, but tasks pertaining to shuttle sorties missions and information management advanced development are included. A series of program options considering technical, schedule, and programmatic alternatives to the baseline program are defined and evaluated.
NASA Technical Reports Server (NTRS)
Redhed, D. D.; Tripp, L. L.; Kawaguchi, A. S.; Miller, R. E., Jr.
1973-01-01
The strategy of the IPAD implementation plan presented, proposes a three phase development of the IPAD system and technical modules, and the transfer of this capability from the development environment to the aerospace vehicle design environment. The system and technical module capabilities for each phase of development are described. The system and technical module programming languages are recommended as well as the initial host computer system hardware and operating system. The cost of developing the IPAD technology is estimated. A schedule displaying the flowtime required for each development task is given. A PERT chart gives the developmental relationships of each of the tasks and an estimate of the operational cost of the IPAD system is offered.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Anderson, E.; Antkowiak, M.; Butt, R.
The Strategic Environmental Research and Developmental Program (SERDP)/Environmental Security Technology Certification Program (ESTCP) is the Department of Defense?s (DOD) environmental science and technology program focusing on issues related to environment and energy for the military services. The SERDP/ESTCP Office requested that the National Renewable Energy Laboratory (NREL) provide technical assistance with strategic planning by evaluating the potential for several types of renewable energy technologies at DOD installations. NREL was tasked to provide technical expertise and strategic advice for the feasibility of geothermal resources, waste-to-energy technology, photovoltaics (PV), wind, microgrids, and building system technologies on military installations. This technical report ismore » the deliverable for these tasks.« less
DOT National Transportation Integrated Search
2006-02-06
for which there is advance warning. With advance warning, evacuations can be planned and managed using procedures and systems that have been developed as a result of extensive and methodical pre-planning. This approach, however, does not adequately s...
NASA Astrophysics Data System (ADS)
Lopez, Bernhard; Whyborn, Nicholas D.; Guniat, Serge; Hernandez, Octavio; Gairing, Stefan
2016-07-01
The Atacama Large Millimeter/submillimeter Array (ALMA) is a joint project between astronomical organizations in Europe, North America, and East Asia, in collaboration with the Republic of Chile. ALMA consists of 54 twelve-meter antennas and 12 seven-meter antennas operating as an aperture synthesis array in the (sub)millimeter wavelength range. Since the inauguration of the observatory back in March 2013 there has been a continuous effort to establish solid operations processes for effective and efficient management of technical and administrative tasks on site. Here a key aspect had been the centralized maintenance and operations planning: input is collected from science stakeholders, the computerized maintenance management system (CMMS) and from the technical teams spread around the world, then this information is analyzed and consolidated based on the established maintenance strategy, the observatory long-term plan and the short-term priorities definitions. This paper presents the high-level process that has been developed for the planning and scheduling of planned- and unplanned maintenance tasks, and for site operations like the telescope array reconfiguration campaigns. We focus on the centralized planning approach by presenting its genesis, its current implementation for the observatory operations including related planning products, and we explore the necessary next steps in order to fully achieve a comprehensive centralized planning approach for ALMA in steady-state operations.
TRU Waste Management Program. Cost/schedule optimization analysis
DOE Office of Scientific and Technical Information (OSTI.GOV)
Detamore, J.A.; Raudenbush, M.H.; Wolaver, R.W.
This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office Rockwell International (JIO/RI) during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, taskmore » guidance development, task monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short-term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. Systems models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.« less
Logan, Jennifer A; Beatty, Maile; Woliver, Renee; Rubinstein, Eric P; Averbach, Abigail R
2005-12-01
Over time, improvements in HIV/AIDS surveillance and service utilization data have increased their usefulness for planning programs, targeting resources, and otherwise informing HIV/AIDS policy. However, community planning groups, service providers, and health department staff often have difficulty in interpreting and applying the wide array of data now available. We describe the development of the Bridging Model, a technical assistance model for overcoming barriers to the use of data for program planning. Through the use of an iterative feedback loop in the model, HIV/AIDS data products constantly are evolving to better inform the decision-making tasks of their multiple users. Implementation of this model has led to improved data quality and data products and to a greater willingness and ability among stakeholders to use the data for planning purposes.
Guide for machine tool task force members
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sutton, G.P.
1978-09-01
The purpose of the guide is to assist members of the Machine Tool Task Force (MTTF) in doing the job, preparing technical summary papers, and helping to achieve a uniform, high-quality output from this comprehensive study effort. It supplements the MTTF Plan (UCRL-52552) which contains other important information on the method of operation of MTTF that is related to the preparation of MTTF reports.
Quarterly Performance/Technical Report of the National Marrow Donor Program
2010-03-31
Implemented the Business to Business ( B2B ) Gateway and Business Services to support : • Incoming HLA typing results incorporating HLA Nomenclature changes...maintenance was performed. IIA.3.2 Task 2: Critical Facility and Staff Related Functions Period 6 Activity: • Business Continuity Planning: o Continued...department development of appropriate detailed tasks to be tested at a remote (non-NMDP controlled) location for the 2010 Business Continuity
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bill Stanley; Patrick Gonzalez; Sandra Brown
2006-06-30
The Nature Conservancy is participating in a Cooperative Agreement with the Department of Energy (DOE) National Energy Technology Laboratory (NETL) to explore the compatibility of carbon sequestration in terrestrial ecosystems and the conservation of biodiversity. The title of the research project is ''Application and Development of Appropriate Tools and Technologies for Cost-Effective Carbon Sequestration''. The objectives of the project are to: (1) improve carbon offset estimates produced in both the planning and implementation phases of projects; (2) build valid and standardized approaches to estimate project carbon benefits at a reasonable cost; and (3) lay the groundwork for implementing cost-effective projects,more » providing new testing ground for biodiversity protection and restoration projects that store additional atmospheric carbon. This Technical Progress Report discusses preliminary results of the six specific tasks that The Nature Conservancy is undertaking to answer research needs while facilitating the development of real projects with measurable greenhouse gas reductions. The research described in this report occurred between April 1st and July 30th 2006. The specific tasks discussed include: Task 1: carbon inventory advancements; Task 2: emerging technologies for remote sensing of terrestrial carbon; Task 3: baseline method development; Task 4: third-party technical advisory panel meetings; Task 5: new project feasibility studies; and Task 6: development of new project software screening tool. Work is being carried out in Brazil, Belize, Chile, Peru and the USA.« less
Avionics Simulation, Development and Software Engineering
NASA Technical Reports Server (NTRS)
2002-01-01
During this reporting period, all technical responsibilities were accomplished as planned. A close working relationship was maintained with personnel of the MSFC Avionics Department Software Group (ED14), the MSFC EXPRESS Project Office (FD31), and the Huntsville Boeing Company. Accomplishments included: performing special tasks; supporting Software Review Board (SRB), Avionics Test Bed (ATB), and EXPRESS Software Control Panel (ESCP) activities; participating in technical meetings; and coordinating issues between the Boeing Company and the MSFC Project Office.
Lessons learned in control center technologies and non-technologies
NASA Technical Reports Server (NTRS)
Hansen, Elaine R.
1991-01-01
Information is given in viewgraph form on the Solar Mesosphere Explorer (SME) Control Center and the Oculometer and Automated Space Interface System (OASIS). Topics covered include SME mission operations functions; technical and non-technical features of the SME control center; general tasks and objects within the Space Station Freedom (SSF) ground system nodes; OASIS-Real Time for the control and monitoring of of space systems and subsystems; and OASIS planning, scheduling, and PC architecture.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bill Stanley; Sandra Brown; Ellen Hawes
2002-09-01
The Nature Conservancy is participating in a Cooperative Agreement with the Department of Energy (DOE) National Energy Technology Laboratory (NETL) to explore the compatibility of carbon sequestration in terrestrial ecosystems and the conservation of biodiversity. The title of the research projects is ''Application and Development of Appropriate Tools and Technologies for Cost-Effective Carbon Sequestration''. The objectives of the project are to: (1) improve carbon offset estimates produced in both the planning and implementation phases of projects; (2) build valid and standardized approaches to estimate project carbon benefits at a reasonable cost; and (3) lay the groundwork for implementing cost-effective projects,more » providing new testing ground for biodiversity protection and restoration projects that store additional atmospheric carbon. This Technical Progress Report discusses preliminary results of the six specific tasks that The Nature Conservancy is undertaking to answer research needs while facilitating the development of real projects with measurable greenhouse gas impacts. The specific tasks discussed include: Task 1: carbon inventory advancements; Task 2: advanced videography testing; Task 3: baseline method development; Task 4: third-party technical advisory panel meetings; Task 5: new project feasibility studies; and Task 6: development of new project software screening tool.« less
International Space Station ECLSS Technical Task Agreement Summary Report
NASA Technical Reports Server (NTRS)
Ray, C. D. (Compiler); Salyer, B. H. (Compiler)
1999-01-01
This Technical Memorandum provides a summary of current work accomplished under Technical Task Agreement (TTA) by the Marshall Space Flight Center (MSFC) regarding the International Space Station (ISS) Environmental Control and Life Support System (ECLSS). Current activities include ECLSS component design and development, computer model development, subsystem/integrated system testing, life testing, and general test support provided to the ISS program. Under ECLSS design, MSFC was responsible for the six major ECLSS functions, specifications and standard, component design and development, and was the architectural control agent for the ISS ECLSS. MSFC was responsible for ECLSS analytical model development. In-house subsystem and system level analysis and testing were conducted in support of the design process, including testing air revitalization, water reclamation and management hardware, and certain nonregenerative systems. The activities described herein were approved in task agreements between MSFC and NASA Headquarters Space Station Program Management Office and their prime contractor for the ISS, Boeing. These MSFC activities are in line to the designing, development, testing, and flight of ECLSS equipment planned by Boeing. MSFC's unique capabilities for performing integrated systems testing and analyses, and its ability to perform some tasks cheaper and faster to support ISS program needs, are the basis for the TTA activities.
Succession planning for technical experts
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kirk, Bernadette Lugue; Cain, Ronald A.; Dewji, Shaheen A.
This report describes a methodology for identifying, evaluating, and mitigating the loss of key technical skills at nuclear operations facilities. The methodology can be adapted for application within regulatory authorities and research and development organizations, and can be directly applied by international engagement partners of the Department of Energy’s National Nuclear Security Administration (NNSA). The resultant product will be of direct benefit to two types of NNSA missions: (1) domestic human capital development programs tasked to provide focused technical expertise to succeed an aging nuclear operations workforce, and (2) international safeguards programs charged with maintaining operational safeguards for developing/existing nuclearmore » power program in nations where minimal available resources must be used effectively. This report considers succession planning and the critical skills necessary to meet an institution’s goals and mission. Closely tied to succession planning are knowledge management and mentorship. In considering succession planning, critical skill sets are identified and are greatly dependent on the subject matter expert in question. This report also provides examples of critical skills that are job specific.« less
Strategic Mobility 21: ICODES Extension Technical Plan
2006-09-30
re-planning tasks in a dynamically changing decision- making environment (Figure 2). The internal ontology is divided into logical domains that can...another web browser window opens. This window is divided into two sections. One section displays a graphical representation of the conveyance and its...referenced objects with attributes that can be reasoned about by the TRANSWAY agents. Context is provided by an internal ontology that is divided into
ISDP salt batch #2 supernate qualification
DOE Office of Scientific and Technical Information (OSTI.GOV)
Peters, T. B.; Nash, C. A.; Fink, S. D.
2009-01-05
This report covers the laboratory testing and analyses of the second Integrated Salt Disposition Project (ISDP) salt supernate samples, performed in support of initial radioactive operations of Actinide Removal Process (ARP) and Modular Caustic-Side Solvent Extraction Unit (MCU). Major goals of this work include characterizing Tank 22H supernate, characterizing Tank 41H supernate, verifying actinide and strontium adsorption with a standard laboratory-scale test using monosodium titanate (MST) and filtration, and checking cesium mass transfer behavior for the MCU solvent performance when contacted with the liquid produced from MST contact. This study also includes characterization of a post-blend Tank 49H sample asmore » part of the Nuclear Criticality Safety Evaluation (NCSE). This work was specified by Task Technical Request and by Task Technical and Quality Assurance Plan (TTQAP). In addition, a sampling plan will be written to guide analytical future work. Safety and environmental aspects of the work were documented in a Hazard Assessment Package.« less
DOT National Transportation Integrated Search
2012-08-01
This report presents the test plan for conducting the Technical Capability Analysis for the United States Department of Transportation (U.S. DOT) evaluation of the San Diego Integrated Corridor Management (ICM) Initiative Demonstration. The ICM proje...
Planning and reasoning in the JPL telerobot testbed
NASA Technical Reports Server (NTRS)
Peters, Stephen; Mittman, David; Collins, Carol; Omeara, Jacquie; Rokey, Mark
1990-01-01
The Telerobot Interactive Planning System is developed to serve as the highest autonomous-control level of the Telerobot Testbed. A recent prototype is described which integrates an operator interface for supervisory control, a task planner supporting disassembly and re-assembly operations, and a spatial planner for collision-free manipulator motion through the workspace. Each of these components is described in detail. Descriptions of the technical problem, approach, and lessons learned are included.
Shuttle payload interface verification equipment study. Volume 2: Technical document, part 1
NASA Technical Reports Server (NTRS)
1976-01-01
The technical analysis is reported that was performed during the shuttle payload interface verification equipment study. It describes: (1) the background and intent of the study; (2) study approach and philosophy covering all facets of shuttle payload/cargo integration; (3)shuttle payload integration requirements; (4) preliminary design of the horizontal IVE; (5) vertical IVE concept; and (6) IVE program development plans, schedule and cost. Also included is a payload integration analysis task to identify potential uses in addition to payload interface verification.
NASA Technical Reports Server (NTRS)
2003-01-01
bd Systems personnel accomplished the technical responsibilities for this reporting period, as planned. A close working relationship was maintained with personnel of the MSFC Avionics Department Software Group (ED 14), the MSFC EXPRESS Project Office (FD3 l), and the Huntsville Boeing Company. Work accomplishments included the support of SRB activities, ATB activities, ESCP activities, participating in technical meetings, coordinating issues between the Boeing Company and the MSFC Project Office, and performing special tasks as requested.
APPLICATION AND DEVELOPMENT OF APPROPRIATE TOOLS AND TECHNOLOGIES FOR COST-EFFECTIVE CARBON
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bill Stanley; Sandra Brown; Ellen Hawes
2003-09-01
The Nature Conservancy is participating in a Cooperative Agreement with the Department of Energy (DOE) National Energy Technology Laboratory (NETL) to explore the compatibility of carbon sequestration in terrestrial ecosystems and the conservation of biodiversity. The title of the research project is ''Application and Development of Appropriate Tools and Technologies for Cost-Effective Carbon Sequestration''. The objectives of the project are to: (1) improve carbon offset estimates produced in both the planning and implementation phases of projects; (2) build valid and standardized approaches to estimate project carbon benefits at a reasonable cost; and (3) lay the groundwork for implementing cost-effective projects,more » providing new testing ground for biodiversity protection and restoration projects that store additional atmospheric carbon. This Technical Progress Report discusses preliminary results of the six specific tasks that The Nature Conservancy is undertaking to answer research needs while facilitating the development of real projects with measurable greenhouse gas impacts. The research described in this report occurred between July 1, 2002 and June 30, 2003. The specific tasks discussed include: Task 1: carbon inventory advancements; Task 2: advanced videography testing; Task 3: baseline method development; Task 4: third-party technical advisory panel meetings; Task 5: new project feasibility studies; and Task 6: development of new project software screening tool.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bill Stanley; Sandra Brown; Patrick Gonzalez
2004-07-10
The Nature Conservancy is participating in a Cooperative Agreement with the Department of Energy (DOE) National Energy Technology Laboratory (NETL) to explore the compatibility of carbon sequestration in terrestrial ecosystems and the conservation of biodiversity. The title of the research project is ''Application and Development of Appropriate Tools and Technologies for Cost-Effective Carbon Sequestration''. The objectives of the project are to: (1) improve carbon offset estimates produced in both the planning and implementation phases of projects; (2) build valid and standardized approaches to estimate project carbon benefits at a reasonable cost; and (3) lay the groundwork for implementing cost-effective projects,more » providing new testing ground for biodiversity protection and restoration projects that store additional atmospheric carbon. This Technical Progress Report discusses preliminary results of the six specific tasks that The Nature Conservancy is undertaking to answer research needs while facilitating the development of real projects with measurable greenhouse gas impacts. The research described in this report occurred between July 1, 2002 and June 30, 2003. The specific tasks discussed include: Task 1: carbon inventory advancements; Task 2: remote sensing for carbon analysis; Task 3: baseline method development; Task 4: third-party technical advisory panel meetings; Task 5: new project feasibility studies; and Task 6: development of new project software screening tool.« less
Biomass power for rural development. Technical progress report, January 1--March 31, 1998
DOE Office of Scientific and Technical Information (OSTI.GOV)
Neuhauser, E.
Brief progress reports are presented on the following tasks: design packages for retrofits at the Dunkirk Station; fuel supply and site development plans; major equipment guarantees and project risk sharing; power production commitment; power plant site plan, construction and environmental permits; and experimental strategies for system evaluation. The paper then discusses in more detail the following: feedstock development efforts; clone-site testing and genetic studies; and efforts at outreach, extension and technology transfer.
Results for the Fourth Quarter Calendar Year 2015 Tank 50H Salt Solution Sample
DOE Office of Scientific and Technical Information (OSTI.GOV)
Crawford, C.
In this memorandum, the chemical and radionuclide contaminant results from the Fourth Quarter Calendar Year 2015 (CY15) sample of Tank 50H salt solution are presented in tabulated form. The Fourth Quarter CY15 Tank 50H samples were obtained on October 29, 2015 and received at Savannah River National Laboratory (SRNL) on October 30, 2015. The information from this characterization will be used by Defense Waste Processing Facility (DWPF) & Saltstone Facility Engineering for the transfer of aqueous waste from Tank 50H to the Salt Feed Tank in the Saltstone Production Facility, where the waste will be treated and disposed of inmore » the Saltstone Disposal Facility. This memorandum compares results, where applicable, to Saltstone Waste Acceptance Criteria (WAC) limits and targets. Data pertaining to the regulatory limits for Resource Conservation and Recovery Act (RCRA) metals will be documented at a later time per the Task Technical and Quality Assurance Plan (TTQAP) for the Tank 50H saltstone task. The chemical and radionuclide contaminant results from the characterization of the Fourth Quarter Calendar Year 2015 (CY15) sampling of Tank 50H were requested by SRR personnel and details of the testing are presented in the SRNL Task Technical and Quality Assurance Plan.« less
Work management plan for data systems and analysis directorate
NASA Technical Reports Server (NTRS)
Nichols, L. R.
1979-01-01
A contract with the Data Systems and Analysis Directorate contains a specified level of resources related to a specific set of work in support of three divisions within the Data Systems and Analysis Directorate. The divisions are Institutional Data Systems Division, Ground Data Systems Division, and Mission Planning and Analysis Division. The Statement of work defines at a functional requirements level the type of support to be provided to the three divisions. The contract provides for further technical direction to the contractor through issuance of Job Orders. The Job order is the prime method of further defining the work to be done, allocating a portion of the total resources in the contract to the defined tasks, and further delegating technical responsibility.
Development of advanced acreage estimation methods
NASA Technical Reports Server (NTRS)
Guseman, L. F., Jr. (Principal Investigator)
1982-01-01
The development of an accurate and efficient algorithm for analyzing the structure of MSS data, the application of the Akaiki information criterion to mixture models, and a research plan to delineate some of the technical issues and associated tasks in the area of rice scene radiation characterization are discussed. The AMOEBA clustering algorithm is refined and documented.
ESL Teacher Training: Worksheets for Teachers of Adult Migrants.
ERIC Educational Resources Information Center
Dickie, J. A.; Lewis, Marilyn
Instructional materials are presented for teachers working with classes of adult migrants at technical institutes, high schools, or community centers in New Zealand. The materials are planned to be used in group training sessions, and the handbook includes suggestions for discussions, group tasks, and individual work. The handbook may be used for…
A Survey on the Use of Microcomputers in Special Libraries.
ERIC Educational Resources Information Center
Krieger, Tillie
1986-01-01
Describes a survey on the use of microcomputers in special libraries. The discussion of the findings includes types of hardware and software in use; applications in public services, technical processes, and administrative tasks; data back-up techniques; training received; evaluation of software; and future plans for microcomputer applications. (1…
ERIC Educational Resources Information Center
Hull, Daniel M.; Lovett, James E.
The Robotics/Automated Systems Technician (RAST) project developed a robotics technician model curriculum for the use of state directors of vocational education and two-year college vocational/technical educators. A baseline management plan was developed to guide the project. To provide awareness, project staff developed a dissemination plan…
ATM experiment S-056 image processing requirements definition
NASA Technical Reports Server (NTRS)
1972-01-01
A plan is presented for satisfying the image data processing needs of the S-056 Apollo Telescope Mount experiment. The report is based on information gathered from related technical publications, consultation with numerous image processing experts, and on the experience that was in working on related image processing tasks over a two-year period.
Software Engineering Improvement Plan
NASA Technical Reports Server (NTRS)
2006-01-01
In performance of this task order, bd Systems personnel provided support to the Flight Software Branch and the Software Working Group through multiple tasks related to software engineering improvement and to activities of the independent Technical Authority (iTA) Discipline Technical Warrant Holder (DTWH) for software engineering. To ensure that the products, comments, and recommendations complied with customer requirements and the statement of work, bd Systems personnel maintained close coordination with the customer. These personnel performed work in areas such as update of agency requirements and directives database, software effort estimation, software problem reports, a web-based process asset library, miscellaneous documentation review, software system requirements, issue tracking software survey, systems engineering NPR, and project-related reviews. This report contains a summary of the work performed and the accomplishments in each of these areas.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fred D. Brent; Lalit Shah; Earl Berry
The overall objective of this project is the three phase development of an Early Entrance Coproduction Plant (EECP) which uses petroleum coke to produce at least one product from at least two of the following three categories: (1) electric power (or heat), (2) fuels, and (3) chemicals using ChevronTexaco's proprietary gasification technology. The objective of Phase I is to determine the feasibility and define the concept for the EECP located at a specific site; develop a Research, Development, and Testing (RD&T) Plan to mitigate technical risks and barriers; and prepare a Preliminary Project Financing Plan. The objective of Phase IImore » is to implement the work as outlined in the Phase I RD&T Plan to enhance the development and commercial acceptance of coproduction technology. The objective of Phase III is to develop an engineering design package and a financing and testing plan for an EECP located at a specific site. The project's intended result is to provide the necessary technical, economic, and environmental information needed by industry to move the EECP forward to detailed design, construction, and operation. The partners in this project are Texaco Energy Systems LLC or TES (a subsidiary of ChevronTexaco), General Electric (GE), Praxair, and Kellogg Brown & Root (KBR) in addition to the U.S. Department of Energy (DOE). TES is providing gasification technology and Fischer-Tropsch (F-T) technology developed by Rentech, GE is providing combustion turbine technology, Praxair is providing air separation technology, and KBR is providing engineering. Each of the EECP subsystems was assessed for technical risks and barriers. A plan was developed to mitigate the identified risks (Phase II RD&T Plan, October 2000). The potential technical and economic risks to the EECP from Task 2.5 can be mitigated by demonstrating that the end-use products derived from the upgrading of the F-T synthesis total liquid product can meet or exceed current specifications for the manufacture of ethylene and propylene chemicals from F-T naphtha, for the generation of hydrogen from F-T naphtha to power fuel cells, for direct blending of F-T diesels into transportation fuels, for the conversion of F-T heavy product wax to transportation fuels, and the conversion of F-T Heavy product wax to a valuable high melting point food-grade specialty wax product. Product evaluations conducted under Task 2.5 of Phase II successfully mitigated the above technical and economic risks to the EECP with the development of product yields and product qualities for the production of chemicals, transportation fuels, and specialty food-grade waxes from the F-T synthesis products.« less
1988-07-01
efforts. 7. Ensure that transition planning materials and manuals are prepared. 8. Ensure proper orientation of staff. 9. Ensure all involved parties...software package which will integrate with the project methodology: User’s manual that is "user friendly". Tutorial with sample data for learning the...program. Menus for direction and assistance. On-line help to avoid constant referral to the manual . Technical support available via telephone. Demo
NASA Technical Reports Server (NTRS)
Hanley, G. M.
1981-01-01
Guidelines and ground rules followed in the development of requirements for the SPS are presented. Development planning objectives are specified in each of these areas, and evolutionary SPS program scenarios are described for the various concepts studied during the past one year contract. Program descriptions are presented as planning packages of technical tasks, and schedule phasing. Each package identifies the ground based technology effort that will facilitate SPS definitions, designs, development, and operations.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bill Stanley; Patrick Gonzalez; Sandra Brown
2005-10-01
The Nature Conservancy is participating in a Cooperative Agreement with the Department of Energy (DOE) National Energy Technology Laboratory (NETL) to explore the compatibility of carbon sequestration in terrestrial ecosystems and the conservation of biodiversity. The title of the research project is ''Application and Development of Appropriate Tools and Technologies for Cost-Effective Carbon Sequestration''. The objectives of the project are to: (1) improve carbon offset estimates produced in both the planning and implementation phases of projects; (2) build valid and standardized approaches to estimate project carbon benefits at a reasonable cost; and (3) lay the groundwork for implementing cost-effective projects,more » providing new testing ground for biodiversity protection and restoration projects that store additional atmospheric carbon. This Technical Progress Report discusses preliminary results of the six specific tasks that The Nature Conservancy is undertaking to answer research needs while facilitating the development of real projects with measurable greenhouse gas reductions. The research described in this report occurred between April 1st , 2005 and June 30th, 2005. The specific tasks discussed include: Task 1: carbon inventory advancements; Task 2: emerging technologies for remote sensing of terrestrial carbon; Task 3: baseline method development; Task 4: third-party technical advisory panel meetings; Task 5: new project feasibility studies; and Task 6: development of new project software screening tool.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bill Stanley; Patrick Gonzalez; Sandra Brown
2006-01-01
The Nature Conservancy is participating in a Cooperative Agreement with the Department of Energy (DOE) National Energy Technology Laboratory (NETL) to explore the compatibility of carbon sequestration in terrestrial ecosystems and the conservation of biodiversity. The title of the research project is ''Application and Development of Appropriate Tools and Technologies for Cost-Effective Carbon Sequestration''. The objectives of the project are to: (1) improve carbon offset estimates produced in both the planning and implementation phases of projects; (2) build valid and standardized approaches to estimate project carbon benefits at a reasonable cost; and (3) lay the groundwork for implementing cost-effective projects,more » providing new testing ground for biodiversity protection and restoration projects that store additional atmospheric carbon. This Technical Progress Report discusses preliminary results of the six specific tasks that The Nature Conservancy is undertaking to answer research needs while facilitating the development of real projects with measurable greenhouse gas reductions. The research described in this report occurred between April 1st , 2005 and June 30th, 2005. The specific tasks discussed include: Task 1: carbon inventory advancements; Task 2: emerging technologies for remote sensing of terrestrial carbon; Task 3: baseline method development; Task 4: third-party technical advisory panel meetings; Task 5: new project feasibility studies; and Task 6: development of new project software screening tool.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chevallier, J.J.; Quetier, F.P.; Marshall, D.W.
Sedco Forex has developed an integrated computer system to enhance the technical performance of the company at various operational levels and to increase the understanding and knowledge of the drill crews. This paper describes the system and how it is used for recording and processing drilling data at the rig site, for associated technical analyses, and for well design, planning, and drilling performance studies at the operational centers. Some capabilities related to the statistical analysis of the company's operational records are also described, and future development of rig computing systems for drilling applications and management tasks is discussed.
Becoming an effective clinical engineering or biomedical technology manager.
Brush, L C
1992-01-01
The BMET or CE Supervisor is a technical manager who is close to the actual work of a biomedical or clinical engineering department. The MPTI is a management training tool that has identified differences between the effective and less-effective technical managers. These behaviors or styles can be considered and applied to the clinical engineering and BMET work environments. Effective BMET or CE Supervisors have a management identity. They are both people-oriented and task-oriented. They are good problem-solvers, and will plan and structure the work tasks and environment. When the situation requires a change in plans, however, they can adapt to the new situation easily. If a decision needs to be made that affects the organization, they will check with higher management or peer managers. Less-effective BMET or CE Supervisors will make important decisions alone, without checking with others. They plan and structure tasks and the work environment, but they are less willing to change when faced with a new situation. They are not people-oriented, and their ability to assess social situations is low. Their need for achievement recognition is often too high. The work environment has an effect on how the competence of a manager is perceived. A "one-desk manager" in a small, one-person biomedical engineering department has more autonomy than a CE Supervisor in a large department. Working for a medical device manufacturing firm often requires a greater management identity. An engineering consultant is often a managing specialist, rather than a traditional manager.(ABSTRACT TRUNCATED AT 250 WORDS)
DOT National Transportation Integrated Search
2006-01-01
Much of what is known about evacuations is based on preparations for incidents, such as hurricanes, for which there is advance warning. With advance warning, evacuations can be planned and managed using procedures and systems that have been developed...
Planning, evaluation and analytical studies in planetary quarantine and spacecraft sterilization
NASA Technical Reports Server (NTRS)
1972-01-01
The technical and analytical support used to aid in developing requirements for planetary quarantine are presented. The investigation was divided into 8 work tasks which are presented in tabular form. Data include methods of sterilization, safety margins for quarantine, revision of contamination logs for Mars and Venus, and estimates of encapsulated and 'free' microbial burden.
Turnaround operations analysis for OTV. Volume 2: Detailed technical report
NASA Technical Reports Server (NTRS)
1988-01-01
The objectives and accomplishments were to adapt and apply the newly created database of Shuttle/Centaur ground operations. Previously defined turnaround operations analyses were to be updated for ground-based OTVs (GBOTVs) and space-based OTVs (SBOTVs), design requirements identified for both OTV and Space Station accommodations hardware, turnaround operations costs estimated, and a technology development plan generated to develop the required capabilities. Technical and programmatic data were provided for NASA pertinent to OTV round and space operations requirements, turnaround operations, task descriptions, timelines and manpower requirements, OTV modular design and booster and Space Station interface requirements. SBOTV accommodations development schedule, cost and turnaround operations requirements, and a technology development plan for ground and space operations and space-based accommodations facilities and support equipment. Significant conclusion are discussed.
Space and Earth Sciences, Computer Systems, and Scientific Data Analysis Support, Volume 1
NASA Technical Reports Server (NTRS)
Estes, Ronald H. (Editor)
1993-01-01
This Final Progress Report covers the specific technical activities of Hughes STX Corporation for the last contract triannual period of 1 June through 30 Sep. 1993, in support of assigned task activities at Goddard Space Flight Center (GSFC). It also provides a brief summary of work throughout the contract period of performance on each active task. Technical activity is presented in Volume 1, while financial and level-of-effort data is presented in Volume 2. Technical support was provided to all Division and Laboratories of Goddard's Space Sciences and Earth Sciences Directorates. Types of support include: scientific programming, systems programming, computer management, mission planning, scientific investigation, data analysis, data processing, data base creation and maintenance, instrumentation development, and management services. Mission and instruments supported include: ROSAT, Astro-D, BBXRT, XTE, AXAF, GRO, COBE, WIND, UIT, SMM, STIS, HEIDI, DE, URAP, CRRES, Voyagers, ISEE, San Marco, LAGEOS, TOPEX/Poseidon, Pioneer-Venus, Galileo, Cassini, Nimbus-7/TOMS, Meteor-3/TOMS, FIFE, BOREAS, TRMM, AVHRR, and Landsat. Accomplishments include: development of computing programs for mission science and data analysis, supercomputer applications support, computer network support, computational upgrades for data archival and analysis centers, end-to-end management for mission data flow, scientific modeling and results in the fields of space and Earth physics, planning and design of GSFC VO DAAC and VO IMS, fabrication, assembly, and testing of mission instrumentation, and design of mission operations center.
The Design, Planning and Control of Robotic Systems in Space
NASA Technical Reports Server (NTRS)
Dubowsky, Steven
1996-01-01
In the future, robotic systems will be expected to perform important tasks in space, in orbit and in planetary exploration. In orbit, current technology requires that tasks such as the repair, construction and maintenance of space stations and satellites be performed by astronaut Extra Vehicular Activity (EVA). Eliminating the need for astronaut EVA through the use of space manipulators would greatly reduce both mission costs and hazards to astronauts. In planetary exploration, cost and logistical considerations clearly make the use of autonomous and telerobotic systems also very attractive, even in cases where an astronaut explorer might be in the area. However, such applications introduce a number of technical problems not found in conventional earth-bound industrial robots. To design useful and practical systems to meet the needs of future space missions, substantial technical development is required, including in the areas of the design, control and planning. The objectives of this research program were to develop such design paradigms and control and planning algorithms to enable future space robotic systems to meet their proposed mission objectives. The underlying intellectual focus of the program is to construct a set of integrated design, planning and control techniques based on an understanding of the fundamental mechanics of space robotic systems. This work was to build upon the results obtained in our previous research in this area supported by NASA Langley Research Center in which we have made important contributions to the area of space robotics.
NASA Technical Reports Server (NTRS)
Schneider, Walter F.; Gatens, Robyn L.; Anderson, Molly S.; Broyan, James L.; MaCatangay, Ariel V.; Shull, Sarah A.; Perry, Jay L.; Toomarian, Nikzad
2016-01-01
Over the last year, the National Aeronautics and Space Administration (NASA) has continued to refine the understanding and prioritization of technology gaps that must be closed in order to achieve Evolvable Mars Campaign objectives and near term objectives in the cislunar proving ground. These efforts are reflected in updates to the technical area roadmaps released by NASA in 2015 and have guided technology development and maturation tasks that have been sponsored by various programs. This paper provides an overview of the refined Environmental Control and Life Support (ECLS) strategic planning, as well as a synopsis of key technology and maturation project tasks that occurred in 2014 and early 2015 to support the strategic needs. Plans for the remainder of 2015 and subsequent years are also described.
NASA Technical Reports Server (NTRS)
Rice, E. E.; Miller, N. E.; Yates, K. R.; Martin, W. E.; Friedlander, A. L.
1980-01-01
The objectives, approach, assumptions, and limitations of a study of nuclear waste disposal in space are discussed with emphasis on the following: (1) payload characterization; (2) safety assessment; (3) health effects assessment; (4) long-term risk assessment; and (5) program planning support to NASA and DOE. Conclusions are presented for each task.
Planas, Maria-Elena; García, Patricia J.; Bustelo, Monserrat; Carcamo, Cesar P.; Martinez, Sebastian; Nopo, Hugo; Rodriguez, Julio; Merino, Maria-Fernanda; Morrison, Andrew
2015-01-01
Most studies reporting ethnic disparities in the quality of healthcare come from developed countries and rely on observational methods. We conducted the first experimental study to evaluate whether health providers in Peru provide differential quality of care for family planning services, based on the indigenous or mestizo (mixed ethnoracial ancestry) profile of the patient. In a crossover randomized controlled trial conducted in 2012, a sample of 351 out of the 408 public health establishments in Metropolitan Lima, Peru were randomly assigned to receive unannounced simulated patients enacting indigenous and mestizo profiles (sequence-1) or mestizo and then indigenous profiles (sequence-2), with a five week wash-out period. Both ethnic profiles used the same scripted scenario for seeking contraceptive advice but had distinctive cultural attributes such as clothing, styling of hair, make-up, accessories, posture and patterns of movement and speech. Our primary outcome measure of quality of care is the proportion of technical tasks performed by providers, as established by Peruvian family planning clinical guidelines. Providers and data analysts were kept blinded to the allocation. We found a non-significant mean difference of -0·7% (p = 0·23) between ethnic profiles in the percentage of technical tasks performed by providers. However we report large deficiencies in the compliance with quality standards of care for both profiles. Differential provider behaviour based on the patient's ethnic profiles compared in the study did not contribute to deficiencies in family planning outcomes observed. The study highlights the need to explore other determinants for poor compliance with quality standards, including demand and supply side factors, and calls for interventions to improve the quality of care for family planning services in Metropolitan Lima. PMID:25671664
Planas, Maria-Elena; García, Patricia J; Bustelo, Monserrat; Carcamo, Cesar P; Martinez, Sebastian; Nopo, Hugo; Rodriguez, Julio; Merino, Maria-Fernanda; Morrison, Andrew
2015-01-01
Most studies reporting ethnic disparities in the quality of healthcare come from developed countries and rely on observational methods. We conducted the first experimental study to evaluate whether health providers in Peru provide differential quality of care for family planning services, based on the indigenous or mestizo (mixed ethnoracial ancestry) profile of the patient. In a crossover randomized controlled trial conducted in 2012, a sample of 351 out of the 408 public health establishments in Metropolitan Lima, Peru were randomly assigned to receive unannounced simulated patients enacting indigenous and mestizo profiles (sequence-1) or mestizo and then indigenous profiles (sequence-2), with a five week wash-out period. Both ethnic profiles used the same scripted scenario for seeking contraceptive advice but had distinctive cultural attributes such as clothing, styling of hair, make-up, accessories, posture and patterns of movement and speech. Our primary outcome measure of quality of care is the proportion of technical tasks performed by providers, as established by Peruvian family planning clinical guidelines. Providers and data analysts were kept blinded to the allocation. We found a non-significant mean difference of -0.7% (p = 0.23) between ethnic profiles in the percentage of technical tasks performed by providers. However we report large deficiencies in the compliance with quality standards of care for both profiles. Differential provider behaviour based on the patient's ethnic profiles compared in the study did not contribute to deficiencies in family planning outcomes observed. The study highlights the need to explore other determinants for poor compliance with quality standards, including demand and supply side factors, and calls for interventions to improve the quality of care for family planning services in Metropolitan Lima.
Research priorities and plans for the International Space Station-results of the 'REMAP' Task Force
NASA Technical Reports Server (NTRS)
Kicza, M.; Erickson, K.; Trinh, E.
2003-01-01
Recent events in the International Space Station (ISS) Program have resulted in the necessity to re-examine the research priorities and research plans for future years. Due to both technical and fiscal resource constraints expected on the International Space Station, it is imperative that research priorities be carefully reviewed and clearly articulated. In consultation with OSTP and the Office of Management and budget (OMB), NASA's Office of Biological and Physical Research (OBPR) assembled an ad-hoc external advisory committee, the Biological and Physical Research Maximization and Prioritization (REMAP) Task Force. This paper describes the outcome of the Task Force and how it is being used to define a roadmap for near and long-term Biological and Physical Research objectives that supports NASA's Vision and Mission. Additionally, the paper discusses further prioritizations that were necessitated by budget and ISS resource constraints in order to maximize utilization of the International Space Station. Finally, a process has been developed to integrate the requirements for this prioritized research with other agency requirements to develop an integrated ISS assembly and utilization plan that maximizes scientific output. c2003 American Institute of Aeronautics and Astronautics. Published by Elsevier Science Ltd. All rights reserved.
Environmental control medical support team
NASA Technical Reports Server (NTRS)
Crump, William J.; Kilgore, Melvin V., Jr.
1988-01-01
The activities conducted in support of the Environmental Control and Life Support Team during December 7, 1987 through September 30, 1988 are summarized. The majority of the ongoing support has focused on the ECLSS area. Through a series of initial meetings with the ECLSS team and technical literature review, an initial list of critical topics was developed. Subtasks were then identified or additional related tasks received as action items from the ECLSS group meetings. Although most of the efforts focused on providing MSFC personnel with information regarding specific questions and problems related to ECLSS issues, other efforts regarding identifying an ECLSS Medical Support Team and constructing data bases of technical information were also initiated and completed. The specific tasks are as follows: (1) Provide support to the mechanical design and integration of test systems as related to microbiological concerns; (2) Assist with design of Human Subjects Test Protocols; (3) Interpretation and recommendations pertaining to air/water quality requirements; (4) Assist in determining the design specifications required as related to the Technical Demonstration Program; (5) Develop a data base of all microorganisms recovered from previous subsystem testing; (6) Estimates of health risk of individual microbes to test subjects; (7) Assist with setting limits for safety of test subjects; (8) Health monitoring of test subjects; (9) Assist in the preparation of test plans; (10) Assist in the development of a QA/QC program to assure the validity, accuracy and precision of the analyses; and (11) Assist in developing test plans required for future man in the loop testing.
Activity Planning for the Mars Exploration Rovers
NASA Technical Reports Server (NTRS)
Bresina, John L.; Jonsson, Ari K.; Morris, Paul H.; Rajan, Kanna
2004-01-01
Operating the Mars Exploration Rovers is a challenging, time-pressured task. Each day, the operations team must generate a new plan describing the rover activities for the next day. These plans must abide by resource limitations, safety rules, and temporal constraints. The objective is to achieve as much science as possible, choosing from a set of observation requests that oversubscribe rover resources. In order to accomplish this objective, given the short amount of planning time available, the MAPGEN (Mixed-initiative Activity Plan GENerator) system was made a mission-critical part of the ground operations system. MAPGEN is a mixed-initiative system that employs automated constraint-based planning, scheduling, and temporal reasoning to assist operations staff in generating the daily activity plans. This paper describes the adaptation of constraint-based planning and temporal reasoning to a mixed-initiative setting and the key technical solutions developed for the mission deployment of MAPGEN.
Toward a Natural Speech Understanding System
1989-10-01
WALTER J. SENUS Technical Director Directorate of Intelligence & Reconnaissance FOR THE COMMANDER JAMES W. HYDE III V Directorate of Plans & Programs ...applicable) Human Resources Laboratory F30602-81-C-0193 8 . ADDRESS (City, State, and ZIP Code) 10. SOURCE OF FUNDING NUMBERS PROGRAM PROJECT TASK WORK...error rates for distinctive words produced in isolation by a single speaker, and their simple programming requirements. Template-matching systems rank
1983-10-05
battle damage. Others are local electrical power and cooling disruptions. Again, a highly critical function is lost if its computer site is destroyed. A...formalized design of the test bed to meet the requirements of the functional description and goals of the program. AMTEC --Z3IT TASKS: 610, 710, 810
Study of a Tracking and Data Acquisition System (TDAS) in the 1990's
NASA Technical Reports Server (NTRS)
1981-01-01
Progress in concept definition studies, operational assessments, and technology demonstrations for the Tracking and Data Acquisition System (TDAS) is reported. The proposed TDAS will be the follow-on to the Tracking and Data Relay Satellite System and will function as a key element of the NASA End-to-End Data System, providing the tracking and data acquisition interface between user accessible data ports on Earth and the user's spaceborne equipment. Technical activities of the "spacecraft data system architecture' task and the "communication mission model' task are emphasized. The objective of the first task is to provide technology forecasts for sensor data handling, navigation and communication systems, and estimate corresponding costs. The second task is concerned with developing a parametric description of the required communication channels. Other tasks with significant activity include the "frequency plan and radio interference model' and the "Viterbi decoder/simulator study'.
Office of Exploration: Exploration studies technical report. Volume 2: Studies approach and results
NASA Technical Reports Server (NTRS)
Roberts, Barney B.; Bland, Dan
1988-01-01
The NASA Office of Exploration has been tasked with defining and recommending alternatives for an early 1990's national decision on a focused program of human exploration of the solar system. The Mission Analysis and System Engineering (MASE) group, which is managed by the Exploration Studies Office at the Johnson Space Center, is responsible for coordinating the technical studies necessary for accomplishing such a task. This technical report describes the process that has been developed in a case study approach. The four case studies that were developed in FY88 include: (1) human expedition to Phobos; (2) human expeditions to Mars; (3) lunar observatory; and (4) lunar outpost to early Mars evolution. The final outcome of this effort is a set of programmatic and technical conclusions and recommendations for the following year's work. Volume 2 describes the case study process, the technical results of each of the case studies, and opportunities for additional study. Included in the discussion of each case study is a description of the mission key features and profile. Mission definition and manifesting are detailed, followed by a description of the mission architecture and infrastructure. Systems concepts for the required orbital nodes, transportation systems, and planetary surface systems are discussed. Prerequisite implementation plans resulting from the synthesized case studies are described and in-depth assessments are presented.
Flat-plate solar array project. Volume 8: Project analysis and integration
NASA Technical Reports Server (NTRS)
Mcguire, P.; Henry, P.
1986-01-01
Project Analysis and Integration (PA&I) performed planning and integration activities to support management of the various Flat-Plate Solar Array (FSA) Project R&D activities. Technical and economic goals were established by PA&I for each R&D task within the project to coordinate the thrust toward the National Photovoltaic Program goals. A sophisticated computer modeling capability was developed to assess technical progress toward meeting the economic goals. These models included a manufacturing facility simulation, a photovoltaic power station simulation and a decision aid model incorporating uncertainty. This family of analysis tools was used to track the progress of the technology and to explore the effects of alternative technical paths. Numerous studies conducted by PA&I signaled the achievement of milestones or were the foundation of major FSA project and national program decisions. The most important PA&I activities during the project history are summarized. The PA&I planning function is discussed and how it relates to project direction and important analytical models developed by PA&I for its analytical and assessment activities are reviewed.
Analysis of Training Plans in Basketball: Gender and Formation Stage Differences
Cañadas, María; Gómez, Miguel-Ángel; García-Rubio, Javier; Ibáñez, Sergio J.
2018-01-01
Abstract Scientific literature has stated the presence of various stages in athletes sportive development, with different objectives in each one of them. This should lead coaches to different training plans according to the athlete’s formation stage. The aim of this study was to analyse training plans and identify differences in basketball objectives according to formative stages (U’12 and U’14) in boys and girls. A total of 1,976 training tasks were collected and analysed, for a total of four teams (girls and boys of U’12 and U’14 categories) during an entire season. Pedagogical variables, game phases, game situations, training means and content were studied. The results showed significant differences between genders. Girls’ teams performed more tasks on offense and technical skills. By contrast, boys’ teams performed more defensive tasks and tactical contents. The 1-on-0 and 1-on-1 were the most repeated game situations in all teams. Coaches used different training tasks according to gender and age. In male U’12 teams, drills predominated, whereas in the other categories, games predominated. For boys’ teams, the contents were tactical oriented, and for girls’ teams, the contents were oriented toward skill acquisition. Studying the pedagogical variables of the training process allowed for identification of the utility of training, assessment, and modification of this process. PMID:29922384
NASA Technical Reports Server (NTRS)
Kafka, P. G.; Skibo, M. A.; White, J. L.
1977-01-01
The feasibility of measuring JT9D propulsion system flight inertia loads on a 747 airplane is studied. Flight loads background is discussed including the current status of 747/JT9D loads knowledge. An instrumentation and test plan is formulated for an airline-owned in-service airplane and the Boeing-owned RA001 test airplane. Technical and cost comparisons are made between these two options. An overall technical feasibility evaluation is made and a cost summary presented. Conclusions and recommendations are presented in regard to using existing inertia loads data versus conducting a flight test to measure inertia loads.
A strategy for providing electronic library services to members of the AGATE Consortium
NASA Technical Reports Server (NTRS)
Thompson, J. Garth
1995-01-01
In November, 1992, NASA Administrator Daniel Goldin established a Task Force to evaluate conditions which have lead to the precipitous decline of the US General Aviation System and to recommend actions needed to re-establish US leadership in General Aviation. The Task Force Report and a report by Dr. Bruce J. Holmes, Manager of the General Aviation/Commuter Office at NASA Langley Research Center provided the directions for the formation of the Advanced General Aviation Transport Experiments (AGATE), a consortium of government, industry and university committed to the revitalization of the US General Aviation Industry. One of the recommendations of the Task Force Report was that 'a central repository of information should be created to disseminate NASA research as well as other domestic and foreign aeronautical research that has been accomplished, is ongoing or is planned... A user friendly environment should be created.' This paper describes technical and logistic issues and recommends a plan for providing technical information to members of the AGATE Consortium. It is recommended that the General Aviation office establish and maintain an electronic literature page on the AGATE server. This page should provide a user friendly interface to existing technical report and index servers identified in the report and listed in the Recommendations section. A page should also be provided which gives links to Web resources. A list of specific resources is provided in the Recommendations section. Links should also be provided to a page with tips on searching, a form to provide for feedback and suggestions from users for other resources. Finally, a page should be maintained which provides pointers to other resources like the LaRCsim workstation simulation software which is avail from LaRC at no cost. The developments of the Web is very dynamic. These developments should be monitored regularly by the GA staff and links to additional resources should be provided on the server as they become available. An recommendation to NASA Headquarters should be made to establish a logically central access to all of the NASA Technical Libraries, to make these resources available both to all NASA employees and to the AGATE Consortium.
A study of mass data storage technology for rocket engine data
NASA Technical Reports Server (NTRS)
Ready, John F.; Benser, Earl T.; Fritz, Bernard S.; Nelson, Scott A.; Stauffer, Donald R.; Volna, William M.
1990-01-01
The results of a nine month study program on mass data storage technology for rocket engine (especially the Space Shuttle Main Engine) health monitoring and control are summarized. The program had the objective of recommending a candidate mass data storage technology development for rocket engine health monitoring and control and of formulating a project plan and specification for that technology development. The work was divided into three major technical tasks: (1) development of requirements; (2) survey of mass data storage technologies; and (3) definition of a project plan and specification for technology development. The first of these tasks reviewed current data storage technology and developed a prioritized set of requirements for the health monitoring and control applications. The second task included a survey of state-of-the-art and newly developing technologies and a matrix-based ranking of the technologies. It culminated in a recommendation of optical disk technology as the best candidate for technology development. The final task defined a proof-of-concept demonstration, including tasks required to develop, test, analyze, and demonstrate the technology advancement, plus an estimate of the level of effort required. The recommended demonstration emphasizes development of an optical disk system which incorporates an order-of-magnitude increase in writing speed above the current state of the art.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-08
... Adoption of Technical Specifications Task Force Traveler TSTF-500, Revision 2, ``DC Electrical Rewrite... Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, ``DC Electrical Rewrite--Update to... Reactor Systems Engineer, Technical Specifications Branch, Mail Stop: O-7 C2A, Division of Inspection and...
TANK 18-F AND 19-F TANK FILL GROUT SCALE UP TEST SUMMARY
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stefanko, D.; Langton, C.
2012-01-03
High-level waste (HLW) tanks 18-F and 19-F have been isolated from FTF facilities. To complete operational closure the tanks will be filled with grout for the purpose of: (1) physically stabilizing the tanks, (2) limiting/eliminating vertical pathways to residual waste, (3) entombing waste removal equipment, (4) discouraging future intrusion, and (5) providing an alkaline, chemical reducing environment within the closure boundary to control speciation and solubility of select radionuclides. This report documents the results of a four cubic yard bulk fill scale up test on the grout formulation recommended for filling Tanks 18-F and 19-F. Details of the scale upmore » test are provided in a Test Plan. The work was authorized under a Technical Task Request (TTR), HLE-TTR-2011-008, and was performed according to Task Technical and Quality Assurance Plan (TTQAP), SRNL-RP-2011-00587. The bulk fill scale up test described in this report was intended to demonstrate proportioning, mixing, and transportation, of material produced in a full scale ready mix concrete batch plant. In addition, the material produced for the scale up test was characterized with respect to fresh properties, thermal properties, and compressive strength as a function of curing time.« less
NASA Technical Reports Server (NTRS)
1984-01-01
The work breakdown structure (WBS) for the Space Platform Expendables Resupply Concept Definition Study is described. The WBS consists of a list of WBS elements, a dictionary of element definitions, and an element logic diagram. The list and logic diagram identify the interrelationships of the elements. The dictionary defines the types of work that may be represented by or be classified under each specific element. The Space Platform Expendable Resupply WBS was selected mainly to support the program planning, scheduling, and costing performed in the programmatics task (task 3). The WBS is neither a statement-of-work nor a work authorization document. Rather, it is a framework around which to define requirements, plan effort, assign responsibilities, allocate and control resources, and report progress, expenditures, technical performance, and schedule performance. The WBS element definitions are independent of make-or-buy decisions, organizational structure, and activity locations unless exceptions are specifically stated.
Reliability Technology to Achieve Insertion of Advanced Packaging (RELTECH) program
NASA Astrophysics Data System (ADS)
Fayette, Daniel F.; Speicher, Patricia; Stoklosa, Mark J.; Evans, Jillian V.; Evans, John W.; Gentile, Mike; Pagel, Chuck A.; Hakim, Edward
1993-08-01
A joint military-commercial effort to evaluate multichip module (MCM) structures is discussed. The program, Reliability Technology to Achieve Insertion of Advanced Packaging (RELTECH), has been designed to identify the failure mechanisms that are possible in MCM structures. The RELTECH test vehicles, technical assessment task, product evaluation plan, reliability modeling task, accelerated and environmental testing, and post-test physical analysis and failure analysis are described. The information obtained through RELTECH can be used to address standardization issues, through development of cost effective qualification and appropriate screening criteria, for inclusion into a commercial specification and the MIL-H-38534 general specification for hybrid microcircuits.
Reliability Technology to Achieve Insertion of Advanced Packaging (RELTECH) program
NASA Technical Reports Server (NTRS)
Fayette, Daniel F.; Speicher, Patricia; Stoklosa, Mark J.; Evans, Jillian V.; Evans, John W.; Gentile, Mike; Pagel, Chuck A.; Hakim, Edward
1993-01-01
A joint military-commercial effort to evaluate multichip module (MCM) structures is discussed. The program, Reliability Technology to Achieve Insertion of Advanced Packaging (RELTECH), has been designed to identify the failure mechanisms that are possible in MCM structures. The RELTECH test vehicles, technical assessment task, product evaluation plan, reliability modeling task, accelerated and environmental testing, and post-test physical analysis and failure analysis are described. The information obtained through RELTECH can be used to address standardization issues, through development of cost effective qualification and appropriate screening criteria, for inclusion into a commercial specification and the MIL-H-38534 general specification for hybrid microcircuits.
NASA Technical Reports Server (NTRS)
Smith, Jeffrey H.; Drews, Michael
1990-01-01
The results are described of an effort to establish commonality and standardization of generic crew extravehicular (crew-EVA) and telerobotic task analysis primitives used for the study of spaceborne operations. Although direct crew-EVA plans are the most visible output of spaceborne operations, significant ongoing efforts by a wide variety of projects and organizations also require tools for estimation of crew-EVA and telerobotic times. Task analysis tools provide estimates for input to technical and cost tradeoff studies. A workshop was convened to identify the issues and needs to establish a common language and syntax for task analysis primitives. In addition, the importance of such a syntax was shown to have precedence over the level to which such a syntax is applied. The syntax, lists of crew-EVA and telerobotic primitives, and the data base in diskette form are presented.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bullin, J.A.; Davison, R.R.; Glover, C.J.
1997-07-01
After an introduction and a literature survey in Chap. 1, Chap. 2 describes the tasks, together with objectives and important results obtained for each task throughout the entire project. Chaps. 3 thru 7 detail work in developing a qualitative and quantitative knowledge of asphalt oxidation, composition dependence of asphalt properties, and guidelines for producing superior asphalt binders through composition control. They also detail the development of a kinetic model for asphalt oxidative aging and present an understanding of the composition dependence of asphalt oxidation as well as other performance-related properties. Chaps. 8 and 9 compare the aging performance of recycledmore » blends produced using commercial recycling agents and industrial supercritical fractions as rejuvenating agents. Oxidative aging of the recycled blends were evaluated along with the performance of the recycled blends in terms of the strategic highway research program performance grading procedure. Chap. 10 summarizes the work completed in the areas of processing schemes development, projection updates, and scale-up and commercialization plans.« less
NASA Technical Reports Server (NTRS)
Bradley, Arthur; Dubowsky, Steven; Quinn, Roger; Marzwell, Neville
2005-01-01
Robots that operate independently of one another will not be adequate to accomplish the future exploration tasks of long-distance autonomous navigation, habitat construction, resource discovery, and material handling. Such activities will require that systems widely share information, plan and divide complex tasks, share common resources, and physically cooperate to manipulate objects. Recognizing the need for interoperable robots to accomplish the new exploration initiative, NASA s Office of Exploration Systems Research & Technology recently funded the development of the Joint Technical Architecture for Robotic Systems (JTARS). JTARS charter is to identify the interface standards necessary to achieve interoperability among space robots. A JTARS working group (JTARS-WG) has been established comprising recognized leaders in the field of space robotics including representatives from seven NASA centers along with academia and private industry. The working group s early accomplishments include addressing key issues required for interoperability, defining which systems are within the project s scope, and framing the JTARS manuals around classes of robotic systems.
Calcination/dissolution chemistry development Fiscal year 1995
DOE Office of Scientific and Technical Information (OSTI.GOV)
Delegard, C.H.
1995-09-01
The task {open_quotes}IPC Liaison and Chemistry of Thermal Reconstitution{close_quotes} is a $300,000 program that was conducted in Fiscal Year (FY) 1995 with U.S. Department of Energy (DOE) Office of Research and Development (EM-53) Efficient Separations and Processing Crosscutting Program supported under technical task plan (TTP) RL4-3-20-04. The principal investigator was Cal Delegard of the Westinghouse Hanford Company (WHC). The task encompassed the following two subtasks related to the chemistry of alkaline Hanford Site tank waste: (1) Technical Liaison with the Institute of Physical Chemistry of the Russian Academy of Science (IPC/RAS) and its research into the chemistry of transuranic elementsmore » (TRU) and technetium (Tc) in alkaline media. (2) Laboratory investigation of the chemistry of calcination/dissolution (C/D) (or thermal reconstitution) as an alternative to the present reference Hanford Site tank waste pretreatment flowsheet, Enhanced Sludge Washing (ESW). This report fulfills the milestone for the C/D subtask to {open_quotes}Provide End-of-Year Report on C/D Laboratory Test Results{close_quotes} due 30 September 1995. A companion report, fulfilling the milestone to provide an end-of-year report on the IPC/RAS liaison, also has been prepared.« less
Mineralogical conversion of asbestos containing materials
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pulsford, S.K.; Foltz, A.D.; Ek, R.B.
The principal objective of the Technical Task Plan (TTP) is to demonstrate a thermal-chemical mineralogical asbestos conversion unit at the Hanford Site, which converts non-radiological asbestos containing materials (ACMs) into an asbestos-free material. The permanent thermal-chemical mineralogical conversion of ACMs to a non-toxic, non-hazardous, potentially marketable end product should not only significantly reduce the waste stream volumes but terminate the {open_quotes}cradle to grave{close_quotes} ownership liabilities.
Using Time-Phased Casualty Estimates to Determine Medical Resupply Requirements
2006-09-18
calculated from the list of tasks. The RSVP-planned MTF laydown would be replaced by the reporting MTF with a known location. One advantage of...Another advantage is the ability to adapt quickly to changing requirements. Supplies that are used at a faster than initially forecast rate will...Officer ( GMO ) Platforms. San Diego, Calif: Naval Health Research Center; 2001. Technical Report No. 01-18. 5. Galarneau MR, Pang G, Konoske PJ
Space station System Engineering and Integration (SE and I). Volume 2: Study results
NASA Technical Reports Server (NTRS)
1987-01-01
A summary of significant study results that are products of the Phase B conceptual design task are contained. Major elements are addressed. Study results applicable to each major element or area of design are summarized and included where appropriate. Areas addressed include: system engineering and integration; customer accommodations; test and program verification; product assurance; conceptual design; operations and planning; technical and management information system (TMIS); and advanced development.
NASA Technical Reports Server (NTRS)
1981-01-01
The specific objectives of the FY 1980-81 tasks are: (1) further refinements to the weighted aggregation procedure; (2) improved approaches for estimating within-stratum variance; (3) more intensive investigation of alternative sampling strategies such as full-frame sampling strategy, and (4) further developments in regard to a simulated approach for assessing the performance of the overall designed sampling and aggregation system.
Science and Sandy: Lessons Learned
NASA Astrophysics Data System (ADS)
Werner, K.
2013-12-01
Following Hurricane Sandy's impact on the mid-Atlantic region, President Obama established a Task Force to '...ensure that the Federal Government continues to provide appropriate resources to support affected State, local, and tribal communities to improve the region's resilience, health, and prosperity by building for the future.' The author was detailed from NOAA to the Task Force between January and June 2013. As the Task Force and others began to take stock of the region's needs and develop plans to address them, many diverse approaches emerged from different areas of expertise including: infrastructure, management and construction, housing, public health, and others. Decision making in this environment was complex with many interests and variables to consider and balance. Although often relevant, science and technical expertise was not always at the forefront of this process. This talk describes the author's experience with the Sandy Task Force focusing on organizing scientific expertise to support the work of the Task Force. This includes a description of federal activity supporting Sandy recovery efforts, the role of the Task Force, and lessons learned from developing a science support function within the Task Force.
Automated radiotherapy treatment plan integrity verification
DOE Office of Scientific and Technical Information (OSTI.GOV)
Yang Deshan; Moore, Kevin L.
2012-03-15
Purpose: In our clinic, physicists spend from 15 to 60 min to verify the physical and dosimetric integrity of radiotherapy plans before presentation to radiation oncology physicians for approval. The purpose of this study was to design and implement a framework to automate as many elements of this quality control (QC) step as possible. Methods: A comprehensive computer application was developed to carry out a majority of these verification tasks in the Philips PINNACLE treatment planning system (TPS). This QC tool functions based on both PINNACLE scripting elements and PERL sub-routines. The core of this technique is the method ofmore » dynamic scripting, which involves a PERL programming module that is flexible and powerful for treatment plan data handling. Run-time plan data are collected, saved into temporary files, and analyzed against standard values and predefined logical rules. The results were summarized in a hypertext markup language (HTML) report that is displayed to the user. Results: This tool has been in clinical use for over a year. The occurrence frequency of technical problems, which would cause delays and suboptimal plans, has been reduced since clinical implementation. Conclusions: In addition to drastically reducing the set of human-driven logical comparisons, this QC tool also accomplished some tasks that are otherwise either quite laborious or impractical for humans to verify, e.g., identifying conflicts amongst IMRT optimization objectives.« less
NASA Langley Systems Analysis & Concepts Directorate Technology Assessment/Portfolio Analysis
NASA Technical Reports Server (NTRS)
Cavanaugh, Stephen; Chytka, Trina; Arcara, Phil; Jones, Sharon; Stanley, Doug; Wilhite, Alan W.
2006-01-01
Systems analysis develops and documents candidate mission and architectures, associated system concepts, enabling capabilities and investment strategies to achieve NASA s strategic objectives. The technology assessment process connects the mission and architectures to the investment strategies. In order to successfully implement a technology assessment, there is a need to collect, manipulate, analyze, document, and disseminate technology-related information. Information must be collected and organized on the wide variety of potentially applicable technologies, including: previous research results, key technical parameters and characteristics, technology readiness levels, relationships to other technologies, costs, and potential barriers and risks. This information must be manipulated to facilitate planning and documentation. An assessment is included of the programmatic and technical risks associated with each technology task as well as potential risk mitigation plans. Risks are assessed and tracked in terms of likelihood of the risk occurring and consequences of the risk if it does occur. The risk assessments take into account cost, schedule, and technical risk dimensions. Assessment data must be simplified for presentation to decision makers. The Systems Analysis and Concepts Directorate (SACD) at NASA Langley Research Center has a wealth of experience in performing Technology Assessment and Portfolio Analysis as this has been a business line since 1978.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stein, Joshua
In 2014, the IEA PVPS Task 13 added the PVPMC as a formal activity to its technical work plan for 2014-2017. The goal of this activity is to expand the reach of the PVPMC to a broader international audience and help to reduce PV performance modeling uncertainties worldwide. One of the main deliverables of this activity is to host one or more PVPMC workshops outside the US to foster more international participation within this collaborative group. This report reviews the results of the first in a series of these joint IEA PVPS Task 13/PVPMC workshops. The 4th PV Performance Modelingmore » Collaborative Workshop was held in Cologne, Germany at the headquarters of TÜV Rheinland on October 22-23, 2015.« less
SPF Full-scale emissions test method development status ...
This is a non-technical presentation that is intended to inform ASTM task group members about our intended approach to full-scale emissions testing that includes the application of spray foam in an environmental chamber. The presentation describes the approach to emissions characterization, types of measurement systems employed, and expected outcomes from the planned tests. Purpose of this presentation is to update the ASTM D22.05 work group regarding status of our full-scale emissions test method development.
SERC 2014 2018 Technical Plan: 2016 Update
2016-02-18
Contract Number: HQ0034-13-D-0004 February 18, 2016 SERC 2014-2018 Technical Plan Update SERC 2014-2018 Technical Plan: 2016 Update...UNCLASSIFIED / APPROVED FOR PUBLIC RELEASE Contract Number: HQ0034-13-D-0004 February 18, 2016 SERC 2014-2018 Technical Plan Update ii...18, 2016 SERC 2014-2018 Technical Plan Update iii TABLE OF CONTENTS Table of Contents
48 CFR 2052.216-72 - Task order procedures.
Code of Federal Regulations, 2010 CFR
2010-10-01
...; (5) Technical skills required; and (6) Estimated level of effort. (b) Task order technical proposal. By the date specified in the TORFP, the contractor shall deliver to the contracting officer a written or verbal (as specified in the TORFP technical proposal submittal instructions) technical proposal...
NASA Astrophysics Data System (ADS)
D'Elia, I.; Bencardino, M.; Ciancarella, L.; Contaldi, M.; Vialetto, G.
2009-12-01
The Italian Air Quality legislation underwent sweeping changes with the implementation of the 1996 European Air Quality Framework Directive when the Italian administrative Regions were entrusted with air quality management tasks. The most recent Regional Air Quality Management Plans (AQMPs) highlighted the importance of Non-Technical Measures (NTMs), in addition to Technical Measures (TMs), in meeting environmental targets. The aim of the present work is to compile a list of all the TMs and NTMs taken into account in the Italian Regional AQMPs and to give in the target year, 2010, an estimation of SO 2, NO x and PM 10 emission reductions, of PM 10 concentration and of the health impact of PM 2.5 concentrations in terms of Life Expectancy Reduction. In order to do that, RAINS-Italy, as part of the National Integrated Modeling system for International Negotiation on atmospheric pollution (MINNI), has been applied. The management of TMs and NTMs inside RAINS have often obliged both the introduction of exogenous driving force scenarios and the control strategy modification. This has inspired a revision of the many NTM definitions and a clear choice of the definition adopted. It was finally highlighted that only few TMs and NTMs implemented in the AQMPs represent effective measures in reaching the environmental targets.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lee, Nathan; Grue, Nicholas W; Rosenlieb, Evan
The purpose of this report is to support the Lao Ministry of Energy and Mines in assessing the technical potential of domestic energy resources for utility scale electricity generation in the Lao PDR. Specifically, this work provides assessments of technical potential, and associated maps of developable areas, for energy technologies of interest. This report details the methodology, assumptions, and datasets employed in this analysis to provide a transparent, replicable process for future analyses. The methodology and results presented are intended to be a fundamental input to subsequent decision making and energy planning-related analyses. This work concentrates on domestic energy resourcesmore » for utility-scale electricity generation and considers solar photovoltaic, wind, biomass, and coal resources. This work does not consider potentially imported energy resources (e.g., natural gas) or domestic energy resources that are not present in sufficient quantity for utility-scale generation (e.g., geothermal resources). A technical potential assessment of hydropower resources is currently not feasible due to the absence of required data including site-level assessments of multiple characteristics (e.g., geology environment and access) as well as spatial data on estimated non-exploited hydropower resources. This report is the second output of the Energy Alternatives Study for the Lao PDR, a collaboration led by the Lao Ministry of Energy and Mines and the United States Agency for International Development under the auspices of the Smart Infrastructure for the Mekong program. The Energy Alternatives Study is composed of five successive tasks that collectively support the project's goals. This work is focused on Task 2 - Assess technical potential of domestic energy resources for electricity generation. The work was carried out by a team from the U.S. Department of Energy's National Renewable Energy Laboratory (NREL) in collaboration with the Lao Ministry of Energy and Mines and other Lao power sector stakeholders. and datasets employed in this analysis to provide a transparent, replicable process for future analyses. The methodology and results presented are intended to be a fundamental input to subsequent decision making and energy planning-related analyses. This work concentrates on domestic energy resources for utility-scale electricity generation and considers solar photovoltaic, wind, biomass, and coal resources. This work does not consider potentially imported energy resources (e.g., natural gas) or domestic energy resources that are not present in sufficient quantity for utility-scale generation (e.g., geothermal resources). A technical potential assessment of hydropower resources is currently not feasible due to the absence of required data including site-level assessments of multiple characteristics (e.g., geology environment and access) as well as spatial data on estimated non-exploited hydropower resources.« less
1988-01-01
system requirements, design guidelines, and interface requirements has been prepared and included as Volume II of this Task 1 topical report. The Volume ...WAESD-TR-88-0002 Conceptual Design Of A Space-Based Multimegawatt MHD Power System ffA«kjjjjjTfc Task 1 Topical Report Volume I: Technical...Space-Based Multimegawatt MHD Power System: Task 1 Topical Report, Volume I: Technical Discussion Personal Author: Dana, RA. Corporate Author Or
Terrestrial Environment (Climatic) Criteria Handbook for Use in Aerospace Vehicle Development
NASA Technical Reports Server (NTRS)
Johnson, Dale L.; Vaughan, William W.
2004-01-01
Aerospace Meteorology provides the identification of that aspect of meteorology that is concerned with the definition and modeling of atmospheric parameters for use in aerospace vehicle development, mission planning and operational capability assessments. One of the principal sources of this information is the NASA-HDBK-1001 "Terrestrial Environment (Climatic) Criteria Handbook for Use in Aerospace Vehicle Development'. This handbook was approved by the NASA Chief Engineer in 2000 as a NASA Preferred Technical Standard . Its technical contents were based on natural environment statistics/models and criteria developed mostly in the early 1990's. A task was approved to completely update the handbook to reflect the current state-of-the-art in the various terrestrial environment climatic areas.
Miniature Telerobots in Space Applications
NASA Technical Reports Server (NTRS)
Venema, S. C.; Hannaford, B.
1995-01-01
Ground controlled telerobots can be used to reduce astronaut workload while retaining much of the human capabilities of planning, execution, and error recovery for specific tasks. Miniature robots can be used for delicate and time consuming tasks such as biological experiment servicing without incurring the significant mass and power penalties associated with larger robot systems. However, questions remain regarding the technical and economic effectiveness of such mini-telerobotic systems. This paper address some of these open issues and the details of two projects which will provide some of the needed answers. The Microtrex project is a joint University of Washington/NASA project which plans on flying a miniature robot as a Space Shuttle experiment to evaluate the effects of microgravity on ground-controlled manipulation while subject to variable time-delay communications. A related project involving the University of Washington and Boeing Defense and Space will evaluate the effectiveness f using a minirobot to service biological experiments in a space station experiment 'glove-box' rack mock-up, again while subject to realistic communications constraints.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1979-06-01
The conceptual design of an advanced central receiver power system using liquid sodium as a heat transport medium has been completed by a team consisting of the Energy Systems Group (prime contractor), McDonnell Douglas, Stearns-Roger, The University of Houston, and Salt River Project. The purpose of this study was to determine the technical and economic advantages of this concept for commercial-scale power plants. This final report covers all tasks of the project. These tasks were as follows: (1) review and analysis of preliminary specification; (2) parametric analysis; (3) select commercial configuration; (4) commercial plant conceptual design; (5) assessment of commercialmore » plant; (6) advanced central receiver power system development plan; (7) program plan; (8) reports and data; (9) program management; and (10) safety analysis. A programmatic overview of the accomplishments of this program is given. The 100-MW conceptual commercial plant, the 281-MW optimum plant, and the 10-MW pilot plant are described. (WHK)« less
A Report by the Governor's Task Force on Vocational and Technical Education.
ERIC Educational Resources Information Center
Governor's Task Force on Vocational and Technical Education, Columbus, OH.
On July 19, 1968, a Task Force on Vocational and Technical Education was created by the governor of Ohio to develop proposals for organization, financing, and legislation. Some major problems to which the Task Force gave attention were: (1) the serious gap between the need for and the availability of vocational and technical education, (2) the…
ERIC Educational Resources Information Center
Kishi, Akemi
To aid in the construction of effective task analysis inventories, this technical report discusses: (1) an optimum questionnaire length that adequately covers Marine tasks without unduly fatiguing respondents; (2) procedures for the phrasing of task statements to avoid ambiguities and be understandable to as broad a range of Marines as is…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This report describes the 1992 Westinghouse Hanford Company/US Department of Energy Environmental Summer Science Camp. The objective of the ``camp`` was to motivate sixth and seventh graders to pursue studies in math, science, and the environment. This objective was accomplished through hands-on fun activities while studying the present and future challenges facing our environment. The camp was funded through Technical Task Plan, 424203, from the US Department of Energy-Headquarters, Office of Environmental Restoration and Waste Management, Technology Development,to Westinghouse Hanford Company`s International Environmental Institute, Education and Internship Performance Group.
1989-09-25
Orders and test specifications. Some mandatory replacement of high failure items are directed by Technical Orders to extend MTBF. Precision bearing and...Experience is very high but natural attrition is reducing the numbers faster than training is furnishing younger mechanics. Surge conditions would be...model validation run output revealed that utilization of equipment is very low and manpower is high . Based on this analysis and the brainstorming
Gas-turbine critical research and advanced technology support project
NASA Technical Reports Server (NTRS)
Clark, J. S.; Lowell, C. E.; Niedzwiecki, R. W.; Nainiger, J. J.
1979-01-01
The technical progress made during the first 15 months of a planned 40-month project to provide a critical-technology data base for utility gas-turbine systems capable of burning coal-derived fuels is summarized. Tasks were included in the following areas: (1) combustion, to study the combustion of coal-derived fuels and conversion of fuel-bound nitrogen to NOx; (2) materials, to understand and prevent hot corrosion; and (3) system studies, to integrate and guide the other technologies. Significant progress was made.
EPA SPF Insulation Research Update | Science Inventory | US ...
This is a non-technical (no data) presentation that is intended to inform ACC/CPI about our intended approach to full-scale emissions testing that includes the application of spray foam in an environmental chamber. The presentation describes the approach to emissions characterization, types of measurement systems to be employed, and expected outcomes from the planned tests. Purpose of this presentation is to update industry stakeholders (American Chemistry Council, Center for Polyurethanes) on status of the spray polyurethane foam insulation emissions methods development task.
ERIC Educational Resources Information Center
Office of Education, US Department of Health, Education, and Welfare, 1959
1959-01-01
Public schools are finding that an educational program which serves as effective preparation for, and as an adequate transition to employment, may involve activities which have often been considered to be beyond the usual scope of school responsibility. Communities are finding that the task of preparing the mentally retarded for community living…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The tasks of the refurbishment of a damaged solar water heating system are outlined. The system is a closed loop, 50% glycol antifreeze system consisting of 14 rows of 6 series manifolds each containing 6 solar collectors connected in parallel for a total of 504 modules. The Wyle Laboratories' test report for the Revere Model 132 flat plate collector is appended. A collector test plan and photographs are also appended. Reference CAPE-2834. (LS)
Management of the aging of critical safety-related concrete structures in light-water reactor plants
DOE Office of Scientific and Technical Information (OSTI.GOV)
Naus, D.J.; Oland, C.B.; Arndt, E.G.
1990-01-01
The Structural Aging Program has the overall objective of providing the USNRC with an improved basis for evaluating nuclear power plant safety-related structures for continued service. The program consists of a management task and three technical tasks: materials property data base, structural component assessment/repair technology, and quantitative methodology for continued-service determinations. Objectives, accomplishments, and planned activities under each of these tasks are presented. Major program accomplishments include development of a materials property data base for structural materials as well as an aging assessment methodology for concrete structures in nuclear power plants. Furthermore, a review and assessment of inservice inspection techniquesmore » for concrete materials and structures has been complete, and work on development of a methodology which can be used for performing current as well as reliability-based future condition assessment of concrete structures is well under way. 43 refs., 3 tabs.« less
Engineered Barrier System: Physical and Chemical Environment
DOE Office of Scientific and Technical Information (OSTI.GOV)
P. Dixon
2004-04-26
The conceptual and predictive models documented in this Engineered Barrier System: Physical and Chemical Environment Model report describe the evolution of the physical and chemical conditions within the waste emplacement drifts of the repository. The modeling approaches and model output data will be used in the total system performance assessment (TSPA-LA) to assess the performance of the engineered barrier system and the waste form. These models evaluate the range of potential water compositions within the emplacement drifts, resulting from the interaction of introduced materials and minerals in dust with water seeping into the drifts and with aqueous solutions forming bymore » deliquescence of dust (as influenced by atmospheric conditions), and from thermal-hydrological-chemical (THC) processes in the drift. These models also consider the uncertainty and variability in water chemistry inside the drift and the compositions of introduced materials within the drift. This report develops and documents a set of process- and abstraction-level models that constitute the engineered barrier system: physical and chemical environment model. Where possible, these models use information directly from other process model reports as input, which promotes integration among process models used for total system performance assessment. Specific tasks and activities of modeling the physical and chemical environment are included in the technical work plan ''Technical Work Plan for: In-Drift Geochemistry Modeling'' (BSC 2004 [DIRS 166519]). As described in the technical work plan, the development of this report is coordinated with the development of other engineered barrier system analysis model reports.« less
Groundwater monitoring well assessment final work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-10-01
Jacobs Engineering Group Inc. (JEG) has been contracted by Environmental Management Operations (EMO) to develop and implement a Groundwater Monitoring Well Assessment Plan for Canal Creek in the Edgewood Area of Aberdeen Proving Ground (APG-EA). The task will be performed under the provisions of Master Agreement 071914-A-D7, Task Order 142133. The project consists of assessing the condition of existing groundwater monitoring wells in the Canal Creek Area prior to a groundwater sampling program. The following Work Plan describes the technical approach that will be used to conduct field work for the project. Integrity of some monitoring wells installed at APG-EAmore » has come into question because of problems with well completions that were detected in wells at the O-field Study Area during a recent sampling event. Because of this, EPA and APG-DSHE officials have requested a well integrity assessment for a percentage of 168 monitoring wells installed at the Canal Creek Study Area(14 by USATHAMA, 152 by USGS). Results of the well assessment will be used to determine if these wells were completed in a fashion that minimizes the potential for either cross-contamination of aquifers or leakage of water from the surface into the well.« less
Assessing family planning service-delivery skills in Kenya.
Valadez, J J; Transgrud, R; Mbugua, M; Smith, T
1997-06-01
This report demonstrates the use of Lot Quality Assurance Sampling (LQAS) to evaluate the technical competence of two cohorts of family planning service providers in Kenya trained with a new curriculum. One cohort had just finished training within two months of the study. The other cohort was the first group trained with the new curriculum about one year before the study. LQAS was adapted from industrial and other public health applications to assess both the individual competence of 30 service providers and the competence of each cohort. Results show that Cohorts One and Two did not differ markedly in the number of tasks needing improvement. However, both cohorts exhibited more tasks needing improvement in counseling skills as compared with physical examination skills or with all other skills. Care-givers who were not currently providing services accounted for most service-delivery problems. This result suggests that providers' use of their skills explains their ability to retain service-delivery skills learned in training to a greater degree than does the amount of time elapsed since they were trained. LQAS proved to be a rapid, easy-to-use empirical method for management decisionmaking for improvement of a family planning training curriculum and services.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1978-06-01
Following a planning period during which the Lawrence Livermore Laboratory and the Department of Defense managing sponsor, the USAF Materials Laboratory, agreed on work statements, the Department of Defense Tri-Service Precision Machine-Tool Program began in February 1978. Milestones scheduled for the first quarter have been met. Tasks and manpower requirements for two basic projects, precision-machining commercialization (PMC) and a machine-tool task force (MTTF), were defined. Progress by PMC includes: (1) documentation of existing precision machine-tool technology by initiation and compilation of a bibliography containing several hundred entries: (2) identification of the problems and needs of precision turning-machine builders and ofmore » precision turning-machine users interested in developing high-precision machining capability; and (3) organization of the schedule and content of the first seminar, to be held in October 1978, which will bring together representatives from the machine-tool and optics communities to address the problems and begin the process of high-precision machining commercialization. Progress by MTTF includes: (1) planning for the organization of a team effort of approximately 60 to 80 international experts to contribute in various ways to project objectives, namely, to summarize state-of-the-art cutting-machine-tool technology and to identify areas where future R and D should prove technically and economically profitable; (2) preparation of a comprehensive plan to achieve those objectives; and (3) preliminary arrangements for a plenary session, also in October, when the task force will meet to formalize the details for implementing the plan.« less
International Space Station ECLSS Technical Task Agreement Summary Report
NASA Technical Reports Server (NTRS)
Minton-Summers, S.; Ray, C. D.
1996-01-01
A summary of work accomplished under Technical Task Agreement by the Marshall Space Flight Center (MSFC) documents activities regarding the Environmental Control and Life Support Systems (ECLSS) of the International Space Station (ISS) program. These MSFC activities were in-line to the designing, the development, the testing, and the flight of ECLSS equipment. MSFC's unique capabilities for performing integrated system testing and analyses, and its ability to perform some tasks cheaper and faster to support ISS program needs are the basis for the Technical Task Agreement activities. Tasks were completed in the Water Recovery Systems, Air Revitalization Systems, and microbiology areas. The results of each task is described in this summary report.
Technical aspects of virtual liver resection planning.
Glombitza, G; Lamadé, W; Demiris, A M; Göpfert, M R; Mayer, A; Bahner, M L; Meinzer, H P; Richter, G; Lehnert, T; Herfarth, C
1998-01-01
Operability of a liver tumor is depending on its three dimensional relation to the intrahepatic vascular trees which define autonomously functioning liver (sub-)segments. Precise operation planning is complicated by anatomic variability, distortion of the vascular trees by the tumor or preceding liver resections. Because of the missing possibility to track the deformation of the liver during the operation an integration of the resection planning system into an intra-operative navigation system is not feasible. So the main task of an operation planning system in this domain is a quantifiable patient selection by exact prediction of post-operative liver function and a quantifiable resection proposal. The system quantifies the organ structures and resection volumes by means of absolute and relative values. It defines resection planes depending on security margins and the vascular trees and presents the data in visualized form as a 3D movie. The new 3D operation planning system offers quantifiable liver resection proposals based on individualized liver anatomy. The results are visualized in digital movies as well as in quantitative reports.
Strategy-Based Technical Instruction: Development and Evaluation
1988-08-01
scripts dependant on target tasks and the outcomes desired, and to the use of node-link knowledge maps as communications props. In addition, we have...information "on the job" - communicate with others in the task environment; - monitor, diagnose, and correct problems associated with critical tasks... communicated . Technical Training Goals The individual in a technical training scenario is expected to achieve a wide variety of goals. These goals can
NASA Astrophysics Data System (ADS)
Uneri, Ali; Schafer, Sebastian; Mirota, Daniel; Nithiananthan, Sajendra; Otake, Yoshito; Reaungamornrat, Sureerat; Yoo, Jongheun; Stayman, J. Webster; Reh, Douglas; Gallia, Gary L.; Khanna, A. Jay; Hager, Gregory; Taylor, Russell H.; Kleinszig, Gerhard; Siewerdsen, Jeffrey H.
2011-03-01
Intraoperative imaging modalities are becoming more prevalent in recent years, and the need for integration of these modalities with surgical guidance is rising, creating new possibilities as well as challenges. In the context of such emerging technologies and new clinical applications, a software architecture for cone-beam CT (CBCT) guided surgery has been developed with emphasis on binding open-source surgical navigation libraries and integrating intraoperative CBCT with novel, application-specific registration and guidance technologies. The architecture design is focused on accelerating translation of task-specific technical development in a wide range of applications, including orthopaedic, head-and-neck, and thoracic surgeries. The surgical guidance system is interfaced with a prototype mobile C-arm for high-quality CBCT and through a modular software architecture, integration of different tools and devices consistent with surgical workflow in each of these applications is realized. Specific modules are developed according to the surgical task, such as: 3D-3D rigid or deformable registration of preoperative images, surgical planning data, and up-to-date CBCT images; 3D-2D registration of planning and image data in real-time fluoroscopy and/or digitally reconstructed radiographs (DRRs); compatibility with infrared, electromagnetic, and video-based trackers used individually or in hybrid arrangements; augmented overlay of image and planning data in endoscopic or in-room video; real-time "virtual fluoroscopy" computed from GPU-accelerated DRRs; and multi-modality image display. The platform aims to minimize offline data processing by exposing quantitative tools that analyze and communicate factors of geometric precision. The system was translated to preclinical phantom and cadaver studies for assessment of fiducial (FRE) and target registration error (TRE) showing sub-mm accuracy in targeting and video overlay within intraoperative CBCT. The work culminates in the development of a CBCT guidance system (reported here for the first time) that leverages the technical developments in Carm CBCT and associated technologies for realizing a high-performance system for translation to clinical studies.
ERIC Educational Resources Information Center
Idaho State Dept. of Education, Boise. Div. of Vocational Education.
Under the Idaho state system for curriculum development in vocational education, Technical Committees made up solely of industry personnel are responsible for drawing up task lists for each program. A Technical Committee Report is prepared on completion of the committees assignment. This Technical Committee Report presents a task list that…
Cordonnier, Aline; Barnier, Amanda J; Sutton, John
2016-01-01
Research on future thinking has emphasized how episodic details from memories are combined to create future thoughts, but has not yet examined the role of semantic scripts. In this study, participants recalled how they planned a past camping trip in Australia (past planning task) and imagined how they would plan a future camping trip (future planning task), set either in a familiar (Australia) or an unfamiliar (Antarctica) context. Transcripts were segmented into information units that were coded according to semantic category (e.g., where, when, transport, material, actions). Results revealed a strong interaction between tasks and their presentation order. Starting with the past planning task constrained the future planning task when the context was familiar. Participants generated no new information when the future camping trip was set in Australia and completed second (after the past planning task). Conversely, starting with the future planning task facilitated the past planning task. Participants recalled more information units of their past plan when the past planning task was completed second (after the future planning task). These results shed new light on the role of scripts in past and future thinking and on how past and future thinking processes interact.
NASA Technical Reports Server (NTRS)
Ray, Charles D.; Carrasquillo, Robyn L.; Minton-Summers, Silvia
1997-01-01
This paper provides a summary of current work accomplished under technical task agreement (TTA) by the Marshall Space Flight Center (MSFC) regarding the Environmental Control and Life Support System (ECLSS) as well as future planning activities in support of the International Space Station (ISS). Current activities include ECLSS computer model development, component design and development, subsystem integrated system testing, life testing, and government furnished equipment delivered to the ISS program. A long range plan for the MSFC ECLSS test facility is described whereby the current facility would be upgraded to support integrated station ECLSS operations. ECLSS technology development efforts proposed to be performed under the Advanced Engineering Technology Development (AETD) program are also discussed.
Improving DOE Project Performance Using the DOD Integrated Master Plan - 12481
DOE Office of Scientific and Technical Information (OSTI.GOV)
Alleman, Glen B.; Nosbisch, Michael R.
2012-07-01
DOE O 413 measures a project's progress to plan by the consumption of funding, the passage of time, and the meeting of milestones. In March of 2003, then Under Secretary, Energy, Science, Card received a memo directing the implementation of Project Management and the Project Management Manual, including the Integrated Master Plan and Integrated Master Schedule. This directive states 'the integrated master plan and schedule tie together all project tasks by showing their logical relationships and any constraints controlling the start or finish of each task. This process results in a hierarchy of related functional and layered schedules derived frommore » the Work Breakdown Structure that can be used for monitoring and controlling project progress'. This paper shows how restoring the IMP/IMS paradigm to DOE program management increases the probability of program success in ways not currently available using DOD O 413 processes alone. Using DOE O 413 series guidance, adding the Integrated Master Plan and Integrated Master Schedule paradigm would provide a hierarchical set of performance measures for each 'package of work,' that provides measurable visibility to the increasing maturity of the project. This measurable maturity provides the mechanism to forecast future performance of cost, schedule, and technical outcomes in ways not available using just the activities in DOE O 413. With this information project managers have another tool available to address the issues identified in GAO-07-336 and GAO-09-406. (authors)« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Osterman, J.L.
1996-06-14
The United States has begun a program of counterproliferation in order to preempt the use of WMD by such elements, however, the ability to respond to the terrorist employment of biological/chemical weapons is absent. Given the structure, capability and technical expertise in the Federal Emergency Management Agency (FEMA) and the Federal Bureau of Investigation (FBI), the Department of Defense (DoD) will be tasked to conduct the response to such an incident. The geographical Commander in Chief (CINC) and the appointed Joint Task Force (JTF) commander will ultimately be assigned the response mission. Planning, training and coordination is required to developmore » a force capable of responding in a timely and coordinated manner.« less
Space station systems technology study (add-on task). Volume 2: Trade study and technology selection
NASA Technical Reports Server (NTRS)
1985-01-01
The current Space Station Systems Technology Study add on task was an outgrowth of the Advanced Platform Systems Technology Study (APSTS) that was completed in April 1983 and the subsequent Space Station System Technology Study completed in April 1984. The first APSTS proceeded from the identification of 106 technology topics to the selection of five for detailed trade studies. During the advanced platform study, the technical issues and options were evaluated through detailed trade processes, individual consideration was given to costs and benefits for the technologies identified for advancement, and advancement plans were developed. An approach similar to that was used in the subsequent study, with emphasis on system definition in four specific technology areas to facilitate a more in depth analysis of technology issues.
The production of the AGARD multilingual aeronautical dictionary using computer techniques
NASA Technical Reports Server (NTRS)
Wente, V. A.; Kirschbaum, J. C.; Kuney, J. H.
1981-01-01
The AGARD Multilingual Aeronautical Dictionary (MAD) contained 7,300 technical terms defined in English but also translated into nine other languages. The preparation work was performed by some 250 scientists and engineers who were members of AGARD and involved the translation skills of staff in many of the NATO nations. Nearly all the compilation and setting work for the book was done by computer and automatic photo-composition. The purpose of this publication is to record how the task was approached in terms of management planning.
Louridas, Marisa; Quinn, Lauren E; Grantcharov, Teodor P
2016-03-01
Emerging evidence suggests that despite dedicated practice, not all surgical trainees have the ability to reach technical competency in minimally invasive techniques. While selecting residents that have the ability to reach technical competence is important, evidence to guide the incorporation of technical ability into selection processes is limited. Therefore, the purpose of the present study was to evaluate whether background experiences and 2D-3D visual spatial test results are predictive of baseline laparoscopic skill for the novice surgical trainee. First-year residents were studied. Demographic data and background surgical and non-surgical experiences were obtained using a questionnaire. Visual spatial ability was evaluated using the PicSOr, cube comparison (CC) and card rotation (CR) tests. Technical skill was assessed using the camera navigation (LCN) task and laparoscopic circle cut (LCC) task. Resident performance on these technical tasks was compared and correlated with the questionnaire and visual spatial findings. Previous experience in observing laparoscopic procedures was associated with significantly better LCN performance, and experience in navigating the laparoscopic camera was associated with significantly better LCC task results. Residents who scored higher on the CC test demonstrated a more accurate LCN path length score (r s(PL) = -0.36, p = 0.03) and angle path (r s(AP) = -0.426, p = 0.01) score when completing the LCN task. No other significant correlations were found between the visual spatial tests (PicSOr, CC or CR) and LCC performance. While identifying selection tests for incoming surgical trainees that predict technical skill performance is appealing, the surrogate markers evaluated correlate with specific metrics of surgical performance related to a single task but do not appear to reliably predict technical performance of different laparoscopic tasks. Predicting the acquisition of technical skills will require the development of a series of evidence-based tests that measure a number of innate abilities as well as their inherent interactions.
NASA Technical Reports Server (NTRS)
Shen, Ji Y.; Sharpe, Lonnie, Jr.
1998-01-01
The research activity for this project is mainly to investigate the necessity and feasibility to develop a structural health monitoring system for rocket engines, and to carry out a research plan for further development of the system. More than one hundred technical papers have been searched and reviewed during the period. We concluded after this investigation that adding a new module in NASA's existing automated diagnostic system to monitor the healthy condition of rocket engine structures is a crucial task, and it's possible to develop such a system based upon the vibrational-based nondestructive damage assessment techniques. A number of such techniques have been introduced. Their advantages and disadvantages are also discussed. A global research plan has been figured out. As the first step of the overall research plan, a proposal for the next fiscal year has been submitted.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Shapiro, S.C.; Woolf, B.
The Northeast Artificial Intelligence Consortium (NAIC) was created by the Air Force Systems Command, Rome Air Development Center, and the Office of Scientific Research. Its purpose is to conduct pertinent research in artificial intelligence and to perform activities ancillary to this research. This report describes progress that has been made in the fourth year of the existence of the NAIC on the technical research tasks undertaken at the member universities. The topics covered in general are: versatile expert system for equipment maintenance, distributed AI for communications system control, automatic photointerpretation, time-oriented problem solving, speech understanding systems, knowledge base maintenance, hardwaremore » architectures for very large systems, knowledge-based reasoning and planning, and a knowledge acquisition, assistance, and explanation system. The specific topic for this volume is the recognition of plans expressed in natural language, followed by their discussion and use.« less
NASA Technical Reports Server (NTRS)
Gawadiak, Yuri; Wong, Alan; Maluf, David; Bell, David; Gurram, Mohana; Tran, Khai Peter; Hsu, Jennifer; Yagi, Kenji; Patel, Hemil
2007-01-01
The Program Management Tool (PMT) is a comprehensive, Web-enabled business intelligence software tool for assisting program and project managers within NASA enterprises in gathering, comprehending, and disseminating information on the progress of their programs and projects. The PMT provides planning and management support for implementing NASA programmatic and project management processes and requirements. It provides an online environment for program and line management to develop, communicate, and manage their programs, projects, and tasks in a comprehensive tool suite. The information managed by use of the PMT can include monthly reports as well as data on goals, deliverables, milestones, business processes, personnel, task plans, monthly reports, and budgetary allocations. The PMT provides an intuitive and enhanced Web interface to automate the tedious process of gathering and sharing monthly progress reports, task plans, financial data, and other information on project resources based on technical, schedule, budget, and management criteria and merits. The PMT is consistent with the latest Web standards and software practices, including the use of Extensible Markup Language (XML) for exchanging data and the WebDAV (Web Distributed Authoring and Versioning) protocol for collaborative management of documents. The PMT provides graphical displays of resource allocations in the form of bar and pie charts using Microsoft Excel Visual Basic for Application (VBA) libraries. The PMT has an extensible architecture that enables integration of PMT with other strategic-information software systems, including, for example, the Erasmus reporting system, now part of the NASA Integrated Enterprise Management Program (IEMP) tool suite, at NASA Marshall Space Flight Center (MSFC). The PMT data architecture provides automated and extensive software interfaces and reports to various strategic information systems to eliminate duplicative human entries and minimize data integrity issues among various NASA systems that impact schedules and planning.
High Productivity Aluminum Manufacturing
2013-07-01
D. J. Spinella Alcoa Inc. Alcoa Technical Center 100 Technical Drive Alcoa Center, PA 15069 July 2013 CNST Base Task Order...Myers, Kirit Shah, D. J. Spinella 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Alcoa , Inc...8. PERFORMING ORGANIZATION REPORT NUMBER 100 Technical Drive Alcoa Center, PA 15069 9
An overview and guide: planning instructional radio.
Imhoof, M
1984-03-01
Successful instructional radio projects require both comprehensive and complex planning. The instructional radio planning team needs to have knowledge and capabilities in several technical, social, and educational areas. Among other skills, the team must understand radio, curriculum design, the subject matter being taught, research and evaluation, and the environment in which the project operates. Once a basic approach to educational planning has been selected and broad educational goals set, radio may be selected as a cost effective means of achieving some of the goals. Assuming radio is a wise choice, there are still several factors which must be analyzed by a team member who is a radio specialist. The most obvious consideration is the inventory and evaluation of the facilities: studios; broadcast, recording, and transmission equipment; classroom radios; and so on. Capabilities of broadcast personnel are another consideration. Initial radio lessons need to teach the learners how to listen to the radio if they have no previous experience with institutional radio broadcasts. A captive, inschool audience ready to listen to radio instructions requires a different use of the medium than a noncaptive audience. With the noncaptive audience, the educational broadcaster must compete with entertaining choices from other media and popular activities and pastimes of the community. The most complex knowledge and analysis required in planning instructional radio concerns the relationship of the content to the medium. Environmental factors are important in planning educational programs. The physical environment may present several constraints on the learning experience and the use of radio. The most obvious is the effect of climate and terrain on the quality of radio reception. The physical environment is easily studied through experience in the target area, but this knowledge plays a significant role in designing effective learning materials for specific learners. Social activities utilized in broadcasts which are contrary to the learners' experience will at best seem strange and at worst be incomprehensible. Curriculum development in an instructional radio project adds more complexity to the planner's task. The most important information needed is whether a new curriculum is to be developed or whether the existing curriculum is to be adapted for radio. Another major analysis task is relating the curriculum to the medium. The project planning team needs to understand the research aims and evaluation methods in instructional radio projects. Sometimes an outside evaluation specialist or team is employed, but in many projects the planning team is responsible for implementing the research design, carrying out the development activities, gathering data, and evaluating the project. Subject matter testing is another technical area of expertise needed by the project team.
Rivard, Mark J; Evans, Dee-Ann Radford; Kay, Ian
2005-01-01
The Fully Integrated Real-time Seed Treatment (FIRST) system by Nucletron has been available in Europe since November 2001 and is being used more and more in Canada and the United States. Like the conventional transrectal ultrasound implant procedure, the FIRST system utilizes an ultrasound probe, needles, and brachytherapy seeds. However, this system is unique in that it (1) utilizes a low-dose-rate brachytherapy seed remote afterloader (the seedSelectron), (2) utilizes 3D image reconstruction acquired from electromechanically controlled, nonstepping rotation of the ultrasound probe, (3) integrates the control of a remote afterloader with electromechanical control of the ultrasound probe for integrating the clinical procedure into a single system, and (4) automates the transfer of planning information and seed delivery to improve quality assurance and radiation safety. This automated delivery system is specifically intended to address reproducibility and accuracy of seed positioning during implantation. The FIRST computer system includes two software environments: SPOT PRO and seedSelectron; both are used to facilitate treatment planning and brachytherapy seed implantation from beginning to completion of the entire procedure. In addition to these features, the system is reported to meet certain product specifications for seed delivery positioning accuracy and reproducibility, seed calibration accuracy and reliability, and brachytherapy dosimetry calculations. Consequently, a technical evaluation of the FIRST system was performed to determine adherence to manufacturer specifications and to the American Association of Physicists in Medicine (AAPM) Task Group Reports 43, 53, 56, 59, and 64 and recommendations of the American Brachytherapy Society (ABS). The United States Nuclear Regulatory Commission (NRC) has recently added Licensing Guidance for the seedSelectron system under 10 CFR 35.1000. Adherence to licensing guidance is made by referencing applicable AAPM Task Group recommendations. In general, results of this evaluation indicated that the system met its claimed specifications as well as the applicable recommendations outlined in the AAPM and ABS reports.
NASA Technical Reports Server (NTRS)
Levak, Daniel
1993-01-01
The objective of this contract was to provide definition of alternate propulsion systems for both earth-to-orbit (ETO) and in-space vehicles (upper stages and space transfer vehicles). For such propulsion systems, technical data to describe performance, weight, dimensions, etc. was provided along with programmatic information such as cost, schedule, needed facilities, etc. Advanced technology and advanced development needs were determined and provided. This volume separately presents the various program cost estimates that were generated under three tasks: the F-1A Restart Task, the J-2S Restart Task, and the SSME Upper Stage Use Task. The conclusions, technical results, and the program cost estimates are described in more detail in Volume 1 - Executive Summary and in individual Final Task Reports.
NASA Technical Reports Server (NTRS)
Levack, Daniel J. H.
2000-01-01
The objective of this contract was to provide definition of alternate propulsion systems for both earth-to-orbit (ETO) and in-space vehicles (upper stages and space transfer vehicles). For such propulsion systems, technical data to describe performance, weight, dimensions, etc. was provided along with programmatic information such as cost, schedule, needed facilities, etc. Advanced technology and advanced development needs were determined and provided. This volume separately presents the various program cost estimates that were generated under three tasks: the F- IA Restart Task, the J-2S Restart Task, and the SSME Upper Stage Use Task. The conclusions, technical results , and the program cost estimates are described in more detail in Volume I - Executive Summary and in individual Final Task Reports.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Atcitty, Stanley
The overall goal of this project is to establish a network of TCUs with essential advanced manufacturing (AM) facilities, associated training and education programs, and private sector and federal agency partnerships to both prepare an American Indian AM workforce and create economic and employment opportunities within Tribal communities through design, manufacturing, and marketing of high quality products. Some examples of high quality products involve next generation grid components such as mechanical energy storage, cabling for distribution of energy, and electrochemical energy storage enclosures. Sandia National Laboratories (Sandia) is tasked to provide technical advising, planning, and academic program development support formore » the TCU/American Indian Higher Education Consortium (AIHEC) Advanced Manufacturing Project. The TCUs include Bay Mills Community College (BMCC), Cankdeska Cikana Community College (CCCC), Navajo Technical University (NTU), Southwestern Indian Polytechnic Institute (SIPI), and Salish Kooteani College. AIHEC and Sandia, with collaboration from SIPI, will be establishing an 8-week summer institute on the SIPI campus during the summer of 2017. Up to 20 students from TCUs are anticipated to take part in the summer program. The goal of the program is to bring AM science, technology, engineering, and mathematics (STEM) awareness and opportunities for the American Indian students. Prior to the summer institute, Sandia will be providing reviews on curriculum plans at the each of the TCUs to ensure the content is consistent with current AM design and engineering practice. In addition, Sandia will provide technical assistance to each of the TCUs in regards to their current AM activities.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Frenkel, G.; Paterson, T.S.; Smith, M.E.
The Institute for Defense Analyses (IDA) has collected and analyzed information on battle management algorithm technology that is relevant to Battle Management/Command, Control and Communications (BM/C3). This Memorandum Report represents a program plan that will provide the BM/C3 Directorate of the Strategic Defense Initiative Organization (SDIO) with administrative and technical insight into algorithm technology. This program plan focuses on current activity in algorithm development and provides information and analysis to the SDIO to be used in formulating budget requirements for FY 1988 and beyond. Based upon analysis of algorithm requirements and ongoing programs, recommendations have been made for research areasmore » that should be pursued, including both the continuation of current work and the initiation of new tasks. This final report includes all relevant material from interim reports as well as new results.« less
International Space Station Increment Operations Services
NASA Astrophysics Data System (ADS)
Michaelis, Horst; Sielaff, Christian
2002-01-01
The Industrial Operator (IO) has defined End-to-End services to perform efficiently all required operations tasks for the Manned Space Program (MSP) as agreed during the Ministerial Council in Edinburgh in November 2001. Those services are the result of a detailed task analysis based on the operations processes as derived from the Space Station Program Implementation Plans (SPIP) and defined in the Operations Processes Documents (OPD). These services are related to ISS Increment Operations and ATV Mission Operations. Each of these End-to-End services is typically characterised by the following properties: It has a clearly defined starting point, where all requirements on the end-product are fixed and associated performance metrics of the customer are well defined. It has a clearly defined ending point, when the product or service is delivered to the customer and accepted by him, according to the performance metrics defined at the start point. The implementation of the process might be restricted by external boundary conditions and constraints mutually agreed with the customer. As far as those are respected the IO has the free choice to select methods and means of implementation. The ISS Increment Operations Service (IOS) activities required for the MSP Exploitation program cover the complete increment specific cycle starting with the support to strategic planning and ending with the post increment evaluation. These activities are divided into sub-services including the following tasks: - ISS Planning Support covering the support to strategic and tactical planning up to the generation - Development &Payload Integration Support - ISS Increment Preparation - ISS Increment Execution These processes are tight together by the Increment Integration Management, which provides the planning and scheduling of all activities as well as the technical management of the overall process . The paper describes the entire End-to-End ISS Increment Operations service and the implementation to support the Columbus Flight 1E related increment and subsequent ISS increments. Special attention is paid to the implications caused by long term operations on hardware, software and operations personnel.
Al-Hallaq, Hania A; Chmura, Steven; Salama, Joseph K; Winter, Kathryn A; Robinson, Clifford G; Pisansky, Thomas M; Borges, Virginia; Lowenstein, Jessica R; McNulty, Susan; Galvin, James M; Followill, David S; Timmerman, Robert D; White, Julia R; Xiao, Ying; Matuszak, Martha M
In 2014, the NRG Oncology Group initiated the first National Cancer Institute-sponsored, phase 1 clinical trial of stereotactic body radiation therapy (SBRT) for the treatment of multiple metastases in multiple organ sites (BR001; NCT02206334). The primary endpoint is to test the safety of SBRT for the treatment of 2 to 4 multiple lesions in several anatomic sites in a multi-institutional setting. Because of the technical challenges inherent to treating multiple lesions as their spatial separation decreases, we present the technical requirements for NRG-BR001 and the rationale for their selection. Patients with controlled primary tumors of breast, non-small cell lung, or prostate are eligible if they have 2 to 4 metastases distributed among 7 extracranial anatomic locations throughout the body. Prescription and organ-at-risk doses were determined by expert consensus. Credentialing requirements include (1) irradiation of the Imaging and Radiation Oncology Core phantom with SBRT, (2) submitting image guided radiation therapy case studies, and (3) planning the benchmark. Guidelines for navigating challenging planning cases including assessing composite dose are discussed. Dosimetric planning to multiple lesions receiving differing doses (45-50 Gy) and fractionation (3-5) while irradiating the same organs at risk is discussed, particularly for metastases in close proximity (≤5 cm). The benchmark case was selected to demonstrate the planning tradeoffs required to satisfy protocol requirements for 2 nearby lesions. Examples of passing benchmark plans exhibited a large variability in plan conformity. NRG-BR001 was developed using expert consensus on multiple issues from the dose fractionation regimen to the minimum image guided radiation therapy guidelines. Credentialing was tied to the task rather than the anatomic site to reduce its burden. Every effort was made to include a variety of delivery methods to reflect current SBRT technology. Although some simplifications were adopted, the successful completion of this trial will inform future designs of both national and institutional trials and would allow immediate clinical adoption of SBRT trials for oligometastases. Copyright © 2016 American Society for Radiation Oncology. Published by Elsevier Inc. All rights reserved.
Mission planning for autonomous systems
NASA Technical Reports Server (NTRS)
Pearson, G.
1987-01-01
Planning is a necessary task for intelligent, adaptive systems operating independently of human controllers. A mission planning system that performs task planning by decomposing a high-level mission objective into subtasks and synthesizing a plan for those tasks at varying levels of abstraction is discussed. Researchers use a blackboard architecture to partition the search space and direct the focus of attention of the planner. Using advanced planning techniques, they can control plan synthesis for the complex planning tasks involved in mission planning.
["Good intentions are not enough": analysis of a health policy for the elderly in Senegal].
Mbaye, Elhadji Mamadou; Ridde, Valery; Kâ, Ousseynou
2013-01-01
In 2006, the Senegalese government introduced the "Plan Sésame", an unprecedented policy in West Africa aimed at reducing social vulnerability among the elderly (i.e. people aged over 60 years). This paper examines the process of implementation of the "Plan Sdsame': Using a qualitative approach, the study was based on a unique case study authorized by the Senegalese Ministry of Health. Three methods were used: i) individual interviews (n = 19), ii) discussion groups (n = 24), and iii) documentary study. Despite its social objective, the "Plan Sésame" was ultimately limited to free health care. However, even the health component of the plan has suffered from under funding. Political obstacles, inadequate accompanying measures and short staffing have resulted in late reimbursements at a local level, thus limiting the implementation of the plan. While both health professionals and elderly people are in favor of free healthcare, they are also critical of the implementation issues surrounding the "Plan Sésame": Although it appears to be a viable solution, these issues may spell the end of the plan. The task of designing solid technical foundations and developing appropriate accompanying measures should not be overlooked because of the limited interest of international partners in the "Plan Sésame" the national dimension of the plan and its electoral importance.
Developing non-technical ward-round skills.
Harvey, Rachel; Mellanby, Edward; Dearden, Effie; Medjoub, Karima; Edgar, Simon
2015-10-01
Conducting clinical 'rounds' is one of the most onerous and important duties that every junior doctor is expected to perform. There is evidence that newly qualified doctors are not adequately prepared by their undergraduate experiences for this task. The aim of this study was to analyse the challenges pertaining to non-technical skills that students would face during ward rounds, and to create a model that facilitates the transition from medical student to doctor. A total of 217 final-year medical students completed a simulated ward round. Free-text responses were analysed using template analysis applying an a priori template developed from the literature by the research team. This drew on the generic categories of non-technical skills suggested by Flin et al. Ninety-seven per cent of students agreed or strongly agreed that the simulated ward round improved their insight into the challenges of ward rounds and their perceived ability to work efficiently as an active member of the ward round. The responding students (206) submitted written feedback describing the learning that they planned to use: 800 learning points were recorded, and all could be categorised into one of seven non-technical skills. Conducting clinical 'rounds' is one of the most onerous and important duties that every junior doctor is expected to perform We believe that improved task efficiency and insight into the challenges of the ward round gained by medical students will lead to an enhancement in performance during clinical rounds, and will have a positive impact on patient safety. We would suggest that undergraduate medical schools consider this model in the preparation for the clinical practice element of the curriculum. © 2015 John Wiley & Sons Ltd.
Effects of Planning on Task Load, Knowledge, and Tool Preference: A Comparison of Two Tools
ERIC Educational Resources Information Center
Bonestroo, Wilco J.; de Jong, Ton
2012-01-01
Self-regulated learners are expected to plan their own learning. Because planning is a complex task, it is not self-evident that all learners can perform this task successfully. In this study, we examined the effects of two planning support tools on the quality of created plans, planning behavior, task load, and acquired knowledge. Sixty-five…
Development and tuning of an original search engine for patent libraries in medicinal chemistry.
Pasche, Emilie; Gobeill, Julien; Kreim, Olivier; Oezdemir-Zaech, Fatma; Vachon, Therese; Lovis, Christian; Ruch, Patrick
2014-01-01
The large increase in the size of patent collections has led to the need of efficient search strategies. But the development of advanced text-mining applications dedicated to patents of the biomedical field remains rare, in particular to address the needs of the pharmaceutical & biotech industry, which intensively uses patent libraries for competitive intelligence and drug development. We describe here the development of an advanced retrieval engine to search information in patent collections in the field of medicinal chemistry. We investigate and combine different strategies and evaluate their respective impact on the performance of the search engine applied to various search tasks, which covers the putatively most frequent search behaviours of intellectual property officers in medical chemistry: 1) a prior art search task; 2) a technical survey task; and 3) a variant of the technical survey task, sometimes called known-item search task, where a single patent is targeted. The optimal tuning of our engine resulted in a top-precision of 6.76% for the prior art search task, 23.28% for the technical survey task and 46.02% for the variant of the technical survey task. We observed that co-citation boosting was an appropriate strategy to improve prior art search tasks, while IPC classification of queries was improving retrieval effectiveness for technical survey tasks. Surprisingly, the use of the full body of the patent was always detrimental for search effectiveness. It was also observed that normalizing biomedical entities using curated dictionaries had simply no impact on the search tasks we evaluate. The search engine was finally implemented as a web-application within Novartis Pharma. The application is briefly described in the report. We have presented the development of a search engine dedicated to patent search, based on state of the art methods applied to patent corpora. We have shown that a proper tuning of the system to adapt to the various search tasks clearly increases the effectiveness of the system. We conclude that different search tasks demand different information retrieval engines' settings in order to yield optimal end-user retrieval.
Development and tuning of an original search engine for patent libraries in medicinal chemistry
2014-01-01
Background The large increase in the size of patent collections has led to the need of efficient search strategies. But the development of advanced text-mining applications dedicated to patents of the biomedical field remains rare, in particular to address the needs of the pharmaceutical & biotech industry, which intensively uses patent libraries for competitive intelligence and drug development. Methods We describe here the development of an advanced retrieval engine to search information in patent collections in the field of medicinal chemistry. We investigate and combine different strategies and evaluate their respective impact on the performance of the search engine applied to various search tasks, which covers the putatively most frequent search behaviours of intellectual property officers in medical chemistry: 1) a prior art search task; 2) a technical survey task; and 3) a variant of the technical survey task, sometimes called known-item search task, where a single patent is targeted. Results The optimal tuning of our engine resulted in a top-precision of 6.76% for the prior art search task, 23.28% for the technical survey task and 46.02% for the variant of the technical survey task. We observed that co-citation boosting was an appropriate strategy to improve prior art search tasks, while IPC classification of queries was improving retrieval effectiveness for technical survey tasks. Surprisingly, the use of the full body of the patent was always detrimental for search effectiveness. It was also observed that normalizing biomedical entities using curated dictionaries had simply no impact on the search tasks we evaluate. The search engine was finally implemented as a web-application within Novartis Pharma. The application is briefly described in the report. Conclusions We have presented the development of a search engine dedicated to patent search, based on state of the art methods applied to patent corpora. We have shown that a proper tuning of the system to adapt to the various search tasks clearly increases the effectiveness of the system. We conclude that different search tasks demand different information retrieval engines' settings in order to yield optimal end-user retrieval. PMID:24564220
Third Report of the Task Force on the Shuttle-Mir Rendezvous and Docking Missions
NASA Technical Reports Server (NTRS)
1994-01-01
In May 1994, the Task Force on the Shuttle-Mir Rendezvous and Docking Missions was established by the NASA Advisory Council. Its purpose is to review Phase 1 (Shuttle-Mir) planning, training, operations, rendezvous and docking, and management and to provide interim reports containing specific recommendations to the Advisory Council. Phase 1 represents the building block to create the experience and technical expertise for an International Space Station. The Phase 1 program brings together the United States and Russia in a major cooperative and contractual program that takes advantage of both countries' capabilities. The content of the Phase 1 program consists of the following elements as defined by the Phase 1 Program Management Plan, dated October 6, 1994: Shuttle-Mir rendezvous and docking missions; astronaut long duration presence on Mir Requirements for Mir support of Phase 1 when astronauts are not on board; outfitting Spektr and Priroda modules with NASA science, research, and risk mitigation equipment Related ground support requirements of NASA and the Russian Space Agency (RSA) to support Phase 1 Integrated NASA and RSA launch schedules and manifests The first meeting of the Task Force was held at the Johnson Space Center (JSC) on May 24 and 25, 1994 with a preliminary report submitted to the NASA Advisory Council on June 6, 1994. The second meeting of the Task Force was held at JSC on July 12 and 13, 1994 and a detailed report containing a series of specific recommendations was submitted on July 29, 1994. This report reflects the results of the third Task Force meeting which was held at JSC on 11 and 12 October, 1994. The briefings presented at that meeting reviewed NASA's response to the Task Force recommendations made to date and provided background data and current status on several critical areas which the Task Force had not addressed in its previous reports.
Orbit Transfer Rocket Engine Technology - 7.5K-LB Thrust Rocket Engine Preliminary Design
1993-10-15
AND SPACE ADMINISTRATION October, 1993 r W NASA-Lewis Research Center Cleveland, Ohio 44135 94-08572 Contract Nc. NAS3-23773 Task B.7 and D.5 4I3’OA4 3 ...APPROACH 1 4.0 SUMMARY OF ACCOMPLISHMENTS 2 5.0 TECHNICAL DISCUSSIONS 3 6.0 PROGRAM WORK PLAN 5 6.1 Engine Analysis 5 6.2 Component Analysis 15 6.2.1...FIGURES Page Figure 1 Advanced Engine Studv Logic Diagram 4 Figure 2 Design Point Engine Pertormance at Full Thrust & MR = 6.0 7 Figure 3 Off-Design
Evaluation of Aeroservoelastic Effects on Flutter
NASA Technical Reports Server (NTRS)
Nagaraja, K. S.; Felt, Larry R.; Kraft, Raymond
1998-01-01
This report presents work performed by The Boeing Company to satisfy the deliverable "Evaluation of aeroservoelastic Effects on Symmetric Flutter" for Subtask 7 of Reference 1. The objective of this report is to incorporate the improved methods for studying the effects of a closed-loop control system on the aeroservoelastic behavior of the airplane planned under NASA HSR technical Integration Task 20 work. Also, a preliminary evaluation of the existing pitch control laws on symmetric flutter of the TCA configuration was addressed."The goal is to develop an improved modeling methodology and perform design studies that account for the aero-structures-systems interaction effects.
Task Allocation for Single Pilot Operations: A Role for the Ground
NASA Technical Reports Server (NTRS)
Johnson, Walter; Lachter, Joel; Feary, Mike; Comerford, Doreen; Battiste, Vernol; Mogford, Richard
2012-01-01
Researchers at NASA Ames Research Center and NASA Langley Research Center are jointly investigating issues associated with potential configurations for an environment in which a single pilot, or reduced crew, might operate. The research summarized in this document represents several of the efforts being put forth at NASA Ames Research Center. Specifically, researchers at NASA Ames Research Center coordinated and hosted a technical interchange meeting in order to gain insight from members of the aviation community. A description of this meeting and the findings are presented first. Thereafter, plans for ensuing research are presented.
NASA Technical Reports Server (NTRS)
1993-01-01
This is the Final Technical Report for the NetView Technical Research task. This report is prepared in accordance with Contract Data Requirements List (CDRL) item A002. NetView assistance was provided and details are presented under the following headings: NetView Management Systems (NMS) project tasks; WBAFB IBM 3090; WPAFB AMDAHL; WPAFB IBM 3084; Hill AFB; McClellan AFB AMDAHL; McClellan AFB IBM 3090; and Warner-Robins AFB.
Task 2 - Limits for High-Frequency Conducted Susceptibility Testing - CS114 (NRC-HQ-60-14-D-0015)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wood, Richard Thomas; Ewing, Paul D.; Moses, Rebecca J.
2015-09-01
A principal focus of Task 2 under this project was for ORNL to evaluate the basis for susceptibility testing against high-frequency conducted interference and to establish recommendations to resolve concerns about the severity of test limits for the conducted susceptibility (CS) test, CS114, from MIL-STD-461. The primary concern about the test limit has been characterized by the EPRI EMI Working Group in the following terms: Demonstrating compliance with the CS114 test limits recommended in TR-102323 has proven to be problematic, even for components that have been tested to commercial standards and demonstrated proper operation in industrial applications [6]. Specifically, EPRImore » notes that the CS114 limits approved in regulatory documents are significantly higher than those invoked by the US military and similar commercial standards in the frequency range below 200 kHz. For this task, ORNL evaluated the original approach to establishing the test limit, EPRI technical findings from a review of the limit, and the regulatory basis through which the currently approved limits were accepted. Based on this analysis, strategies have been developed regarding changes to the CS114 limit that can resolve the technical concerns raised by the industry. Guided by the principles that reasonable assurance of safety must not be compromised but excessive conservatism should be reduced, recommendations on a suitable basis for a revised limit have been developed and can be incorporated into the planned Revision 2 of RG 1.180.« less
Engineering Technical Review Planning Briefing
NASA Technical Reports Server (NTRS)
Gardner, Terrie
2012-01-01
The general topics covered in the engineering technical planning briefing are 1) overviews of NASA, Marshall Space Flight Center (MSFC), and Engineering, 2) the NASA Systems Engineering(SE) Engine and its implementation , 3) the NASA Project Life Cycle, 4) MSFC Technical Management Branch Services in relation to the SE Engine and the Project Life Cycle , 5) Technical Reviews, 6) NASA Human Factor Design Guidance , and 7) the MSFC Human Factors Team. The engineering technical review portion of the presentation is the primary focus of the overall presentation and will address the definition of a design review, execution guidance, the essential stages of a technical review, and the overall review planning life cycle. Examples of a technical review plan content, review approaches, review schedules, and the review process will be provided and discussed. The human factors portion of the presentation will focus on the NASA guidance for human factors. Human factors definition, categories, design guidance, and human factor specialist roles will be addressed. In addition, the NASA Systems Engineering Engine description, definition, and application will be reviewed as background leading into the NASA Project Life Cycle Overview and technical review planning discussion.
ERIC Educational Resources Information Center
Weyers, Lori; Langerman, Philip
In 1989-90, the General Education Task Force of the Wisconsin Technical College System (WTCS) was convened to determine the role of the general education curriculum in the attainment of skills that enhance the likelihood of success among technical college graduates in their careers, homes and communities. The Task Force consisted of at least one…
Encoding and choice in the task span paradigm.
Reiman, Kaitlin M; Weaver, Starla M; Arrington, Catherine M
2015-03-01
Cognitive control during sequences of planned behaviors requires both plan-level processes such as generating, maintaining, and monitoring the plan, as well as task-level processes such as selecting, establishing and implementing specific task sets. The task span paradigm (Logan in J Exp Psychol Gen 133:218-236, 2004) combines two common cognitive control paradigms, task switching and working memory span, to investigate the integration of plan-level and task-level processes during control of sequential behavior. The current study expands past task span research to include measures of encoding processes and choice behavior with volitional sequence generation, using the standard task span as well as a novel voluntary task span paradigm. In two experiments, we consider how sequence complexity, defined separately for plan-level and task-level complexity, influences sequence encoding (Experiment 1), sequence choice (Experiment 2), sequence memory, and task performance of planned sequences of action. Results indicate that participants were sensitive to sequence complexity, but that different aspects of behavior are most strongly influenced by different types of complexity. Hierarchical complexity at the plan level best predicts voluntary sequence generation and memory; while switch frequency at the task level best predicts encoding of externally defined sequences and task performance. Furthermore, performance RTs were similar for externally and internally defined plans, whereas memory was improved for internally defined sequences. Finally, participants demonstrated a significant sequence choice bias in the voluntary task span. Consistent with past research on choice behavior, volitional selection of plans was markedly influenced by both the ease of memory and performance.
Klein, Stanley B.; Robertson, Theresa E.; Delton, Andrew W.
2013-01-01
In a series of papers, Nairne and colleagues have demonstrated that tasks encouraging participants to judge words for relevance to survival led to better recall than did tasks lacking survival relevance. Klein, Robertson, and Delton (2010) presented data suggesting that the future-directed temporal orientation of the survival task (e.g., planning), rather than survival per se, accounts for the good recall found with the task. In the present studies we manipulated the amount of survival and planning processing encouraged by a set of encoding tasks. Participants performed tasks that encouraged processing stimuli for their relevance to (a) both survival and planning, (b) planning, but not survival, or (c) survival but not planning. We predicted, and found, that recall performance associated with tasks encouraging planning (i.e., survival with planning and planning without survival) should exceed tasks that encouraged survival but not planning (i.e., survival without planning). We draw several conclusions. First, planning is a necessary component of the superior recall found in the survival paradigm. Second, memory, from an evolutionary perspective, is inherently prospective—tailored by natural selection to support future decisions and judgements that cannot be known in advance with certainty. PMID:21229456
2011-12-01
systems engineering technical and technical management processes. Technical Planning, Stakeholders Requirements Development, and Architecture Design were...Stakeholder Requirements Definition, Architecture Design and Technical Planning. A purposive sampling of AFRL rapid development program managers and engineers...emphasize one process over another however Architecture Design , Implementation scored higher among Technical Processes. Decision Analysis, Technical
Action planning and position sense in children with Developmental Coordination Disorder.
Adams, Imke L J; Ferguson, Gillian D; Lust, Jessica M; Steenbergen, Bert; Smits-Engelsman, Bouwien C M
2016-04-01
The present study examined action planning and position sense in children with Developmental Coordination Disorder (DCD). Participants performed two action planning tasks, the sword task and the bar grasping task, and an active elbow matching task to examine position sense. Thirty children were included in the DCD group (aged 6-10years) and age-matched to 90 controls. The DCD group had a MABC-2 total score ⩽5th percentile, the control group a total score ⩾25th percentile. Results from the sword-task showed that children with DCD planned less for end-state comfort. On the bar grasping task no significant differences in planning for end-state comfort between the DCD and control group were found. There was also no significant difference in the position sense error between the groups. The present study shows that children with DCD plan less for end-state comfort, but that this result is task-dependent and becomes apparent when more precision is needed at the end of the task. In that respect, the sword-task appeared to be a more sensitive task to assess action planning abilities, than the bar grasping task. The action planning deficit in children with DCD cannot be explained by an impaired position sense during active movements. Copyright © 2016 Elsevier B.V. All rights reserved.
The weight of Thai infants exclusively breast-fed and formula-fed from birth to four months.
Chavalittamrong, B; Jirapinyo, P
1987-05-01
The 18-month Industry-Based Family Planning Project, which involved 30 industrial establishments located in Metro Manila (Philippines), combined a heavy interpersonal component, through a network of trained in-plant volunteers (IPVs), with an intensive in-plant information campaign. The latter made use of seminars, audiovisual presentations, posters, brochures, leaflets, photo exhibits, and contests. Training of the project staff -- 5 project officers and a project coordinator -- included providing them with the knowledge, attitudes, and skills necessary to carry out their tasks. Tasks were: to transfer to the IPVs knowledge of the concept of responsible parenthood and the various family planning methods, skills in motivating other workers, and responding to rumors and misconceptions about family planning methods; to act as resource persons on responsible parenthood and family planning methods in the industry setting; and to provide the technical support to the IPVs on responsible parenthood. The campaign plan centered on strategies which would help achieve the project objective, i.e., to increase the demand for and the availability of family planning information and services using nongovernment and government organizations. Basically, the plan addressed 2 segments of the industrial sector: the workers as the primary audience and the company managers as the secondary target. According to the program's pro-choice policy, a wide range of approved family planning services were made available to interested employees either by accredited company clinics or outside family planning service centers. Services by outside family planning service clinics were delivered via referrals or, in some instances, at the company's "doorstep." The end-of-project evaluation and the analysis of data gathered from reports and records maintained by the companies and by the Population Center Foundation (PCF) indicate that, after 18 months of operation, the project was able to substantially achieve its objective. It increased the demand for family planning information and services among workers in 30 industrial establishments located in Metro Manila. The more frequently mentioned sources of information on responsible parenthood and family planning were project-related personnel. Additionally, the different family planning methods became more widely known in the companies.
Sanders, Chad; Low, Christina; Schmitter-Edgecombe, Maureen
2014-01-01
There is currently limited research evaluating planning abilities, a core subcomponent of executive functioning, in individuals with mild cognitive impairment (MCI). In the present study, we utilized the "Amap Task," an open-ended problem-solving task, to separately evaluate the formulation and execution components of planning ability in individuals with MCI. Thirty-seven cognitively healthy older adults and 37 individuals with MCI used a map layout of a university apartment to develop and write out a strategy (formulation stage) to successfully complete a list of tasks (e.g., retrieve and fill a water pitcher before placing it in the refrigerator). Subsequently, participants carried out the tasks in the apartment with the aid of their formulated plan (execution stage). MCI participants performed more poorly than older adult (OA) controls during both the formulation and execution stages on measures of task accuracy and task efficiency. However, both groups were able to adjust and improve task accuracy and efficiency from formulation to task execution. Finally, MCI participants took significantly longer to complete the task and adhered less to their formulated plans during task completion. Using an open-ended problem-solving task, the findings revealed that individuals with MCI experienced difficulties with both the formulation and execution components of planning. Like controls, participants with MCI were able to successfully modify their plan online, improving their performance from task formulation to task execution.
An efficient temporal logic for robotic task planning
NASA Technical Reports Server (NTRS)
Becker, Jeffrey M.
1989-01-01
Computations required for temporal reasoning can be prohibitively expensive if fully general representations are used. Overly simple representations, such as totally ordered sequence of time points, are inadequate for use in a nonlinear task planning system. A middle ground is identified which is general enough to support a capable nonlinear task planner, but specialized enough that the system can support online task planning in real time. A Temporal Logic System (TLS) was developed during the Intelligent Task Automation (ITA) project to support robotic task planning. TLS is also used within the ITA system to support plan execution, monitoring, and exception handling.
Robot body self-modeling algorithm: a collision-free motion planning approach for humanoids.
Leylavi Shoushtari, Ali
2016-01-01
Motion planning for humanoid robots is one of the critical issues due to the high redundancy and theoretical and technical considerations e.g. stability, motion feasibility and collision avoidance. The strategies which central nervous system employs to plan, signal and control the human movements are a source of inspiration to deal with the mentioned problems. Self-modeling is a concept inspired by body self-awareness in human. In this research it is integrated in an optimal motion planning framework in order to detect and avoid collision of the manipulated object with the humanoid body during performing a dynamic task. Twelve parametric functions are designed as self-models to determine the boundary of humanoid's body. Later, the boundaries which mathematically defined by the self-models are employed to calculate the safe region for box to avoid the collision with the robot. Four different objective functions are employed in motion simulation to validate the robustness of algorithm under different dynamics. The results also confirm the collision avoidance, reality and stability of the predicted motion.
Improved silicon nitride for advanced heat engines
NASA Technical Reports Server (NTRS)
Yeh, Hun C.; Fang, Ho T.
1987-01-01
The technology base required to fabricate silicon nitride components with the strength, reliability, and reproducibility necessary for actual heat engine applications is presented. Task 2 was set up to develop test bars with high Weibull slope and greater high temperature strength, and to conduct an initial net shape component fabrication evaluation. Screening experiments were performed in Task 7 on advanced materials and processing for input to Task 2. The technical efforts performed in the second year of a 5-yr program are covered. The first iteration of Task 2 was completed as planned. Two half-replicated, fractional factorial (2 sup 5), statistically designed matrix experiments were conducted. These experiments have identified Denka 9FW Si3N4 as an alternate raw material to GTE SN502 Si3N4 for subsequent process evaluation. A detailed statistical analysis was conducted to correlate processing conditions with as-processed test bar properties. One processing condition produced a material with a 97 ksi average room temperature MOR (100 percent of goal) with 13.2 Weibull slope (83 percent of goal); another condition produced 86 ksi (6 percent over baseline) room temperature strength with a Weibull slope of 20 (125 percent of goal).
ERIC Educational Resources Information Center
Yuan, Fangyuan; Ellis, Rod
2003-01-01
Investigated the effects of both pre-task and on-line planning on second language (L2) oral production. Results show that pre-task planning enhances grammatical complexity while on-line planning positively influences accuracy and grammatical complexity. Pre-task planners also produced more fluent and lexically varied language than the on-line…
Douven, Wim; Buurman, Joost
2013-10-15
Road development in relatively undisturbed floodplain systems, such as the floodplains of the Mekong River, will impact hydraulics and interrupt the natural flow of water. This affects the ecology and environment, and the livelihoods of people who depend on fishing and agriculture. On the other hand, floods can severely damage road infrastructure in years with large floods and can cause high annual maintenance costs. Improving road development practices in floodplains is a complex, multidimensional task involving hydraulic and geotechnical analysis, ecosystem analysis, socio-economic analysis, policy analysis, etc. This paper analyses the planning practice of road development and rehabilitation and how this practice can be improved in support of economically and environmentally sustainable roads in floodplains. It is concluded that although ample technical, planning and environmental assessment guidelines exist, guidelines need updating to address cumulative impacts at floodplain level and factors hampering the implementation in guidelines should be addressed in the guideline design (process). Copyright © 2013 Elsevier Ltd. All rights reserved.
Analysis of sheltering and evacuation strategies for an urban nuclear detonation scenario.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Yoshimura, Ann S.; Brandt, Larry D.
2009-05-01
Development of an effective strategy for shelter and evacuation is among the most important planning tasks in preparation for response to a low yield, nuclear detonation in an urban area. This study examines shelter-evacuate policies and effectiveness focusing on a 10 kt scenario in Los Angeles. The goal is to provide technical insights that can support development of urban response plans. Results indicate that extended shelter-in-place can offer the most robust protection when high quality shelter exists. Where less effective shelter is available and the fallout radiation intensity level is high, informed evacuation at the appropriate time can substantially reducemore » the overall dose to personnel. However, uncertainties in the characteristics of the fallout region and in the exit route can make evacuation a risky strategy. Analyses indicate that only a relatively small fraction of the total urban population may experience significant dose reduction benefits from even a well-informed evacuation plan.« less
Technical Assistance Plan (TAP)
A Technical Assistance Plan (TAP) enables community groups to retain the services of an independent technical advisor and to provide resources for a community group to help inform other community members about site decisions.
Interactive visuo-motor therapy system for stroke rehabilitation.
Eng, Kynan; Siekierka, Ewa; Pyk, Pawel; Chevrier, Edith; Hauser, Yves; Cameirao, Monica; Holper, Lisa; Hägni, Karin; Zimmerli, Lukas; Duff, Armin; Schuster, Corina; Bassetti, Claudio; Verschure, Paul; Kiper, Daniel
2007-09-01
We present a virtual reality (VR)-based motor neurorehabilitation system for stroke patients with upper limb paresis. It is based on two hypotheses: (1) observed actions correlated with self-generated or intended actions engage cortical motor observation, planning and execution areas ("mirror neurons"); (2) activation in damaged parts of motor cortex can be enhanced by viewing mirrored movements of non-paretic limbs. We postulate that our approach, applied during the acute post-stroke phase, facilitates motor re-learning and improves functional recovery. The patient controls a first-person view of virtual arms in tasks varying from simple (hitting objects) to complex (grasping and moving objects). The therapist adjusts weighting factors in the non-paretic limb to move the paretic virtual limb, thereby stimulating the mirror neuron system and optimizing patient motivation through graded task success. We present the system's neuroscientific background, technical details and preliminary results.
iPhone in NASA Ground Operations
NASA Technical Reports Server (NTRS)
Benedict, Ashley; Byrd, Keena; Ignacio, Lalaine; Lagu, Amit; Palmer, Ralph Curtis, III; Savoy, April; Surabattula, Deepti; Vaitkunas, Samantha
2007-01-01
A comprehensive review of the literature and historical background of NASA established a need for an easy-to-implement technological improvement to displaying procedures which is cost effective and risk reducing. Previous unsuccessful attempts have led this team to explore the practicality of using a mobile handheld device. The major products, inputs, resources, constraints, planning and effort required for consideration of this type of solution were outlined. After analyzing the physical, environmental, life-cycle, functional, and socio-technical requirements, a Functional Analysis was performed to describe the top-level, second-level, and third-level functions of the system requirements. In addition, the risk/value proposition of conversion to a new technology was considered and gave a blueprint for transitioning along with the tasks necessary to implement the device into the Vehicle Assembly Building's (VAB) current infrastructure. A Work Breakdown Structure (WBS) described the elemental work items of the implementation. Once the viability of this system was confirmed, a device was selected through use of technical design comparison methods including the Pugh Matrix and House of Quality. Comparison and evaluation of the Apple iPhone, Motorola Q, Blackberry, PC Notebook, and PDA revealed that the iPhone is the most suitable device for this task. This paper outlines the device design/ architecture, as well as some of the required infrastructure.
Oncentra brachytherapy planning system.
Yang, Jack
2018-03-27
In modern cancer management, treatment planning has progressed as a contemporary tool with all the advances in computing power in recent years. One of the advanced planning tools uses 3-dimensional (3D) data sets for accurate dose distributions in patient prescription. Among these planning processes, brachytherapy has been a very important part of a successful cancer management program, offering clinical benefits with specific or combined treatments with external beam therapy. In this chapter, we mainly discussed the Elekta Oncentra planning system, which is the main treatment planning tool for high-dose rate (HDR) modality in our facility and in many other facilities in the United States. HDR is a technically advanced form of brachytherapy; a high-intensity radiation source (3.6 mm in length) is delivered with step motor in submillimeter precision under computer guidance directly into the tumor areas while minimizing injury to surrounding normal healthy tissue. Oncentra planning is the key component to generate a deliverable brachytherapy procedure, which is executed on the microSelectron V3 remote afterloader treatment system. Creating a highly conformal plan can be a time-consuming task. The development of Oncentra software (version 4.5.3) offers a variety of useful tools that facilitate many of the clinical challenging tasks for planning, such as contouring and image reconstruction, as well as rapid planning calculations with dose and dose volume histogram analysis. Oncentra Brachy module creates workflow and optimizes the planning accuracy for wide varieties of clinical HDR treatments, such as skin, gynecologic (GYN), breast, prostate, and many other applications. The treatment file can also be transferred to the afterloader control station for speedy delivery. The design concept, calculation algorithms, and optimization modules presented some key characteristics to plan and treat the patients effectively and accurately. The dose distribution and accuracy of several clinical sample cases were discussed to illustrate the effectiveness and clinical efficacy. The American Association of Physicists in Medicine brachytherapy reports of TG-43 and TG-186 were also described and compared in evaluations of fundamental calculation methodologies. Copyright © 2018 American Association of Medical Dosimetrists. Published by Elsevier Inc. All rights reserved.
48 CFR 2452.242-71 - Contract management system.
Code of Federal Regulations, 2011 CFR
2011-10-01
..., concise summary of technical progress made and the costs incurred for each task during the reporting... technical progress made for each task during the reporting period; and (B) Identifies problems, or potential... and progress reporting as described herein. (b) The contract management system shall consist of two...
Architectural Drafting: Commercial Applications. Teacher Guide.
ERIC Educational Resources Information Center
Whitney, Terry A.
This curriculum guide contains the technical information and tasks necessary for a student (who has already completed basic drafting) to be employed as an architectural drafter trainee. The curriculum is written in terms of student performance using measurable objectives, technical information, tasks developed to accomplish those objectives, and…
Resource Planning Model | Energy Analysis | NREL
balancing authority. An image of a overlapping circles labelled Resource, Technical, Economic, and Market competing electricity technologies. An image of a overlapping circles labelled Resource, Technical, Economic ; Federal Resource Planning. Volume 1: Sectoral, Technical, and Economic Trends, NREL Technical Report (2016
Foster, J D; Miskovic, D; Allison, A S; Conti, J A; Ockrim, J; Cooper, E J; Hanna, G B; Francis, N K
2016-06-01
Laparoscopic rectal resection is technically challenging, with outcomes dependent upon technical performance. No robust objective assessment tool exists for laparoscopic rectal resection surgery. This study aimed to investigate the application of the objective clinical human reliability analysis (OCHRA) technique for assessing technical performance of laparoscopic rectal surgery and explore the validity and reliability of this technique. Laparoscopic rectal cancer resection operations were described in the format of a hierarchical task analysis. Potential technical errors were defined. The OCHRA technique was used to identify technical errors enacted in videos of twenty consecutive laparoscopic rectal cancer resection operations from a single site. The procedural task, spatial location, and circumstances of all identified errors were logged. Clinical validity was assessed through correlation with clinical outcomes; reliability was assessed by test-retest. A total of 335 execution errors identified, with a median 15 per operation. More errors were observed during pelvic tasks compared with abdominal tasks (p < 0.001). Within the pelvis, more errors were observed during dissection on the right side than the left (p = 0.03). Test-retest confirmed reliability (r = 0.97, p < 0.001). A significant correlation was observed between error frequency and mesorectal specimen quality (r s = 0.52, p = 0.02) and with blood loss (r s = 0.609, p = 0.004). OCHRA offers a valid and reliable method for evaluating technical performance of laparoscopic rectal surgery.
NASA Technical Reports Server (NTRS)
Pinelli, Thomas E.; Glassman, Nanci A.; Affelder, Linda O.; Hecht, Laura M.; Kennedy, John M.; Barclay, Rebecca O.
1994-01-01
This paper reports the results of an exploratory study that investigated the influence of technical uncertainty on the use of information and information sources by U.S. industry-affiliated aerospace engineers and scientists in completing or solving a project, task, or problem. Data were collected through a self-administered questionnaire. Survey participants were U.S. aerospace engineers and scientists whose names appeared on the Society of Automotive Engineers (SAE) mailing list. The results support the findings of previous research and the following study assumptions. Information and information-source use differ for projects, problems, and tasks with high and low technical uncertainty. As technical uncertainty increases, information-source use changes from internal to external and from informal to formal sources. As technical uncertainty increases, so too does the use of federally funded aerospace research and development (R&D). The use of formal information sources to learn about federally funded aerospace R&D differs for projects, problems, and tasks with high and low technical uncertainty.
Renewable Energy Development in Hermosa Beach, California
NASA Astrophysics Data System (ADS)
Morris, K.
2016-12-01
The City of Hermosa Beach, California, with the support of the AGU's TEX program, is exploring the potential for renewable energy generation inside the City, as part of the implementation of the City's 2015 Municipal Carbon Neutral Plan. Task 1: Estimate the technical potential of existing and future technologies Given the City's characteristics, this task will identify feasible technologies: wind, solar, tidal/wave, wastewater biogas, landfill biogas, microscale anaerobic digestion (AD), and complementary energy storage. Some options may be open to the City acting alone, but others will require working with municipal partners and private entities that provide services to Hermosa Beach (e.g., wastewater treatment). Energy storage is a means to integrate intermittent renewable energy output. Task 2: Review transaction types and pathways In this task, feasible technologies will be further examined in terms of municipal ordinances and contractual paths: (a) power purchase agreements (PPAs) with developers, under which the City would purchase energy or storage services directly; (b) leases with developers, under which the City would rent sites (e.g., municipal rooftops) to developers; (c) ordinances related to permitting, under which the City would reduce regulatory barriers to entry for developers; (d) pilot projects, under which the City would engage with developers to test new technologies such as wind/wave/microscale AD (pursuant to PPAs and/or leases); and (e) existing projects, under which the City would work with current wastewater and landfill contractors to understand (i) current plans to develop renewable energy, and (ii) opportunities for the City to work with such contractors to promote renewable energy. Task 3: Estimate costs by technology Finally, the last task will gather existing information about the costs, both current and projected, of the feasible technologies, including (i) overnight construction cost (capital); (ii) integration costs (e.g., charges from Edison and energy storage); (iii) costs that may be avoided due to promotion of renewable energy; and (iv) comparisons of projected annual nominal costs (in $/MWh and net present values).
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dr. Dale M. Snider
2011-02-28
This report gives the result from the Phase-1 work on demonstrating greater than 10x speedup of the Barracuda computer program using parallel methods and GPU processors (General-Purpose Graphics Processing Unit or Graphics Processing Unit). Phase-1 demonstrated a 12x speedup on a typical Barracuda function using the GPU processor. The problem test case used about 5 million particles and 250,000 Eulerian grid cells. The relative speedup, compared to a single CPU, increases with increased number of particles giving greater than 12x speedup. Phase-1 work provided a path for reformatting data structure modifications to give good parallel performance while keeping a friendlymore » environment for new physics development and code maintenance. The implementation of data structure changes will be in Phase-2. Phase-1 laid the ground work for the complete parallelization of Barracuda in Phase-2, with the caveat that implemented computer practices for parallel programming done in Phase-1 gives immediate speedup in the current Barracuda serial running code. The Phase-1 tasks were completed successfully laying the frame work for Phase-2. The detailed results of Phase-1 are within this document. In general, the speedup of one function would be expected to be higher than the speedup of the entire code because of I/O functions and communication between the algorithms. However, because one of the most difficult Barracuda algorithms was parallelized in Phase-1 and because advanced parallelization methods and proposed parallelization optimization techniques identified in Phase-1 will be used in Phase-2, an overall Barracuda code speedup (relative to a single CPU) is expected to be greater than 10x. This means that a job which takes 30 days to complete will be done in 3 days. Tasks completed in Phase-1 are: Task 1: Profile the entire Barracuda code and select which subroutines are to be parallelized (See Section Choosing a Function to Accelerate) Task 2: Select a GPU consultant company and jointly parallelize subroutines (CPFD chose the small business EMPhotonics for the Phase-1 the technical partner. See Section Technical Objective and Approach) Task 3: Integrate parallel subroutines into Barracuda (See Section Results from Phase-1 and its subsections) Task 4: Testing, refinement, and optimization of parallel methodology (See Section Results from Phase-1 and Section Result Comparison Program) Task 5: Integrate Phase-1 parallel subroutines into Barracuda and release (See Section Results from Phase-1 and its subsections) Task 6: Roadmap of Phase-2 (See Section Plan for Phase-2) With the completion of Phase 1 we have the base understanding to completely parallelize Barracuda. An overview of the work to move Barracuda to a parallelized code is given in Plan for Phase-2.« less
Methodology for Planning Technical Education: With a Case Study of Polytechnics in Bangladesh.
ERIC Educational Resources Information Center
Ritzen, Jozef M.; Balderston, Judith B.
A product of research first begun by one of the authors in Bangladesh, this book develops a comprehensive set of methods for planning technical education. Wherever possible, the authors draw on existing tools, fitting them to the specific context of technical education. When faced with planning problems for which existing methods are ill suited…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-27
... of Technical Specifications Task Force Traveler TSTF-510, Revision 2, ``Revision to Steam Generator..., Revision 2, ``Revision to Steam Generator [(SG)] Program Inspection Frequencies and Tube Sample Selection..., ``Steam Generator (SG) Program,'' Specification 5.6.7, ``Steam Generator Tube Inspection Report,'' and the...
Solar Energy Task Force Report on Education and Training.
ERIC Educational Resources Information Center
O'Connor, J. Kevin
The Solar Energy Task Force Report summarizes data, information, and discussions focusing on solar space and water heating applications. The report is intended to fill a need for curriculum and course development and direction for technical training programs, especially in vocational/technical schools and community colleges. It addresses…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-01
... Models for Plant-Specific Adoption of Technical Specifications Task Force Traveler TSTF-500, Revision 2... Specifications Task Force (TSTF) Traveler TSTF- 500, Revision 2, ``DC Electrical Rewrite--Update to TSTF-360....8.6, ``Battery Cell Parameters.'' Additionally, a new Administrative Controls program, titled...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-20
... Ventilation System Surveillance Requirements To Operate for 10 Hours per Month,'' Using the Consolidated Line... currently require operating the ventilation system for at least 10 continuous hours with the heaters... Technical Specifications (TSs) Task Force (TSTF) Traveler TSTF-522, Revision 0, ``Revise Ventilation System...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-22
... Ventilation System Surveillance Requirements to Operate for 10 hours per Month.'' DATES: Comment period....1, which currently require operating the heaters in the respective systems for at least 10... Adoption of Technical Specifications Task Force Traveler TSTF-522, Revision 0, ``Revise Ventilation System...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-14
... Market and Planning Efficiency Through Improved Software; Notice of Technical Conference To Discuss Increasing Market and Planning Efficiency Through Improved Software May 7, 2010. Take notice that Commission... planning efficiency through improved software. [[Page 27342
Obtaining Technical Support for Superfund, RCRA and Brownfields Site Issues Fact Sheet
EPA’s Technical Support Centers (TSCs) and other technical support services are available to Regional RemedialProject Managers, Corrective Action Staff, and On-Scene Coordinators needing specialized technical expertisefor specific tasks or projects.
The Use of Logistic Model in RUL Assessment
NASA Astrophysics Data System (ADS)
Gumiński, R.; Radkowski, S.
2017-12-01
The paper takes on the issue of assessment of remaining useful life (RUL). The goal of the paper was to develop a method, which would enable use of diagnostic information in the task of reducing the uncertainty related to technical risk. Prediction of the remaining useful life (RUL) of the system is a very important task for maintenance strategy. In the literature RUL of an engineering system is defined as the first future time instant in which thresholds of conditions (safety, operational quality, maintenance cost, etc) are violated. Knowledge of RUL offers the possibility of planning the testing and repair activities. Building models of damage development is important in this task. In the presented work, logistic function will be used to model fatigue crack development. It should be remembered that modeling of every phase of damage development is very difficult, yet modeling of every phase of damage separately, especially including on-line diagnostic information is more effective. Particular attention was paid to the possibility of forecasting the occurrence of damage due to fatigue while relying on the analysis of the structure of a vibroacoustic signal.
Hanford Environmental Dose Reconstruction Project
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cannon, S.D.; Finch, S.M.
1992-10-01
The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The independent Technical Steering Panel (TSP) provides technical direction. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed from release to impact on humans (dose estimates):Source Terms, Environmental Transport, Environmental Monitoring Data, Demography, Food Consumption, and Agriculture, and Environmental Pathways and Dose Estimates.
Task planning and control synthesis for robotic manipulation in space applications
NASA Technical Reports Server (NTRS)
Sanderson, A. C.; Peshkin, M. A.; Homem-De-mello, L. S.
1987-01-01
Space-based robotic systems for diagnosis, repair and assembly of systems will require new techniques of planning and manipulation to accomplish these complex tasks. Results of work in assembly task representation, discrete task planning, and control synthesis which provide a design environment for flexible assembly systems in manufacturing applications, and which extend to planning of manipulatiuon operations in unstructured environments are summarized. Assembly planning is carried out using the AND/OR graph representation which encompasses all possible partial orders of operations and may be used to plan assembly sequences. Discrete task planning uses the configuration map which facilitates search over a space of discrete operations parameters in sequential operations in order to achieve required goals in the space of bounded configuration sets.
The Task Is Not Enough: Processing Approaches to Task-Based Performance
ERIC Educational Resources Information Center
Skehan, Peter; Xiaoyue, Bei; Qian, Li; Wang, Zhan
2012-01-01
This article reports on three research studies, all of which concern second language task performance. The first focuses on planning, and compares on-line and strategic planning as well as task repetition. The second study examines the role of familiarity on task performance, and compares this with conventional strategic planning. The third study…
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations : for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and E...
ERIC Educational Resources Information Center
Minnesota State Board for Vocational Education, St. Paul.
In March 1982, the Minnesota Division of Vocational-Technical Education received requests from State legislators to develop an action plan to address the problems of declining enrollments and resources. In response to this request, a plan was developed whereby area vocational-technical institutes (AVTIs) in the State would (1) promote a process…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-01
...] Notice of Availability of a Technical Agency Draft Recovery Plan for Pyne's Ground-Plum (Astragalus... availability of the technical agency draft recovery plan for Pyne's ground-plum (Astragalus bibullatus), a...: Background We listed Pyne's ground-plum as an endangered species under the Act (16 U.S.C. 1531 et seq.), on...
Boiler materials for ultra supercritical coal power plants
DOE Office of Scientific and Technical Information (OSTI.GOV)
Purgert, Robert; Shingledecker, John; Pschirer, James
2015-12-29
The U.S. Department of Energy (DOE) and the Ohio Coal Development Office (OCDO) have undertaken a project aimed at identifying, evaluating, and qualifying the materials needed for the construction of the critical components of coal-fired boilers capable of operating at much higher efficiencies than current generation of supercritical plants. This increased efficiency is expected to be achieved principally through the use of advanced ultrasupercritical (A-USC) steam conditions up to 760°C (1400°F) and 35 MPa (5000 psi). A limiting factor to achieving these higher temperatures and pressures for future A-USC plants are the materials of construction. The goal of this projectmore » is to assess/develop materials technology to build and operate an A-USC boiler capable of delivering steam with conditions up to 760°C (1400°F)/35 MPa (5000 psi). The project has successfully met this goal through a focused long-term public-private consortium partnership. The project was based on an R&D plan developed by the Electric Power Research Institute (EPRI) and an industry consortium that supplemented the recommendations of several DOE workshops on the subject of advanced materials. In view of the variety of skills and expertise required for the successful completion of the proposed work, a consortium led by the Energy Industries of Ohio (EIO) with cost-sharing participation of all the major domestic boiler manufacturers, ALSTOM Power (Alstom), Babcock and Wilcox Power Generation Group, Inc. (B&W), Foster Wheeler (FW), and Riley Power, Inc. (Riley), technical management by EPRI and research conducted by Oak Ridge National Laboratory (ORNL) has been developed. The project has clearly identified and tested materials that can withstand 760°C (1400°F) steam conditions and can also make a 700°C (1300°F) plant more economically attractive. In this project, the maximum temperature capabilities of these and other available high-temperature alloys have been assessed to provide a basis for materials selection and application under a range of conditions prevailing in the boiler. A major effort involving eight tasks was completed in Phase 1. In a subsequent Phase 2 extension, the earlier defined tasks were extended to finish and enhance the Phase 1 activities. This extension included efforts in improved weld/weldment performance, development of longer-term material property databases, additional field (in-plant) corrosion testing, improved understanding of long-term oxidation kinetics and exfoliation, cyclic operation, and fabrication methods for waterwalls. In addition, preliminary work was undertaken to model an oxyfuel boiler to define local environments expected to occur and to study corrosion behavior of alloys under these conditions. This final technical report provides a comprehensive summary of all the work undertaken by the consortium and the research findings from all eight (8) technical tasks including A-USC boiler design and economics (Task 1), long-term materials properties (Task 2), steam- side oxidation (Task 3), Fireside Corrosion (Task 4), Welding (Task 5), Fabricability (Task 6), Coatings (Task 7), and Design Data and Rules (Task 8).« less
NASA Technical Reports Server (NTRS)
Simon, Tom
2009-01-01
To effectively manage a project, the project manager must have a plan, understand the current conditions, and be able to take action to correct the course when challenges arise. Research and design projects face technical, schedule, and budget challenges that make it difficult to utilize project management tools developed for projects based on previously demonstrated technologies. Projects developing new technologies by their inherent nature are trying something new and thus have little to no data to support estimates for schedule and cost, let alone the technical outcome. Projects with a vision for the outcome but little confidence in the exact tasks to accomplish in order to achieve the vision incur cost and schedule penalties when conceptual solutions require unexpected iterations or even a reinvention of the plan. This presentation will share the project management methodology and tools developed through trial and error for a NASA research and design project combining industry, academia, and NASA inhouse work in which Earned Value Management principles were employed but adapted for the reality of the government financial system and the reality of challenging technology development. The priorities of the presented methodology are flexibility, accountability, and simplicity to give the manager tools to help deliver to the customer while not using up valuable time and resources on extensive planning and analysis. This presentation will share the methodology, tools, and work through failed and successful examples from the three years of process evolution.
Maintaining technical excellence requires a national plan
NASA Technical Reports Server (NTRS)
Davidson, T. F.
1991-01-01
To meet the challenge of technical excellence, AIA established a rocket propulsion committee to develop the National Rocket Propulsion Strategic Plan. Developing such a plan required a broad spectrum of experience and disciplines. The Strategic Plan team needed the participation of industry, government, and academia. The plan provides, if followed, a means for the U.S. to maintain technical excellence and world leadership in rocket propulsion. To implement the National Rocket Propulsion Strategic Plan is to invest in the social, economic, and technological futures of America. The plan lays the basis for upgrading existing propulsion systems and a firm base for future full scale development, production, and operation of rocket propulsion systems for space, defense, and commercial applications.
Task-Based EFL Language Teaching with Procedural Information Design in a Technical Writing Context
ERIC Educational Resources Information Center
Roy, Debopriyo
2017-01-01
Task-based language learning (TBLL) has heavily influenced syllabus design, classroom teaching, and learner assessment in a foreign or second language teaching context. In this English as foreign language (EFL) learning environment, the paper discussed an innovative language learning pedagogy based on design education and technical writing. In…
Printing/Graphic Arts Technology. Curriculum Guide. Invest in Success.
ERIC Educational Resources Information Center
Idaho State Dept. of Education, Boise. Div. of Vocational Education.
Under the Idaho state system for curriculum development in vocational education, Technical Committees made up solely of industry personnel are responsible for drawing up task lists for each program. A Technical Committee Report is prepared on completion of the Committee's assignment. This report presents a task list that reflects current trends…
State Technical Committee for Accounting. Official Report.
ERIC Educational Resources Information Center
Jensen, Claudia
This report contains validated task inventory listings for accounting occupations. An introductory report in brief outline form gives background of the work of the technical committee that identified the duties and tasks. This is followed by four attachments which make up most of the document. Attachment A has two parts: (1) an accounting skills…
INDOT Technical Training Plan : Appendix B
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix M
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix P
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix F
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix H
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix E
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix O
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix J
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix L
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix A
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix D
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix K
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix G
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix I
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix N
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix C
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
Hanford Environmental Dose Reconstruction Project. Monthly report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cannon, S.D.; Finch, S.M.
1992-10-01
The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The independent Technical Steering Panel (TSP) provides technical direction. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed from release to impact on humans (dose estimates):Source Terms, Environmental Transport, Environmental Monitoring Data, Demography, Food Consumption, and Agriculture, and Environmental Pathways and Dose Estimates.
ERIC Educational Resources Information Center
Yu, Zuguang; Zeng, Zida
Since the early 1990s, China's government has followed a socialist market economy system. Accordingly, the technical and vocational education (TVE) should be restructured to meet its needs. Reform of the TVE system has four aspects. First, reform of the planning system includes a move from a central plan of enrollment to planning according to…
The management of large cabling campaigns during the Long Shutdown 1 of LHC
NASA Astrophysics Data System (ADS)
Meroli, S.; Machado, S.; Formenti, F.; Frans, M.; Guillaume, J. C.; Ricci, D.
2014-03-01
The Large Hadron Collider at CERN entered into its first 18 month-long shutdown period in February 2013. During this period the entire CERN accelerator complex will undergo major consolidation and upgrade works, preparing the machines for LHC operation at nominal energy (7 TeV/beam). One of the most challenging activities concerns the cabling infrastructure (copper and optical fibre cables) serving the CERN data acquisition, networking and control systems. About 1000 kilometres of cables, distributed in different machine areas, will be installed, representing an investment of about 15 MCHF. This implies an extraordinary challenge in terms of project management, including resource and activity planning, work execution and quality control. The preparation phase of this project started well before its implementation, by defining technical solutions and setting financial plans for staff recruitment and material supply. Enhanced task coordination was further implemented by deploying selected competences to form a central support team.
Update on SLD Engineering Tools Development
NASA Technical Reports Server (NTRS)
Miller, Dean R.; Potapczuk, Mark G.; Bond, Thomas H.
2004-01-01
The airworthiness authorities (FAA, JAA, Transport Canada) will be releasing a draft rule in the 2006 timeframe concerning the operation of aircraft in a Supercooled Large Droplet (SLD) environment aloft. The draft rule will require aircraft manufacturers to demonstrate that their aircraft can operate safely in an SLD environment for a period of time to facilitate a safe exit from the condition. It is anticipated that aircraft manufacturers will require a capability to demonstrate compliance with this rule via experimental means (icing tunnels or tankers) and by analytical means (ice prediction codes). Since existing icing research facilities and analytical codes were not developed to account for SLD conditions, current engineering tools are not adequate to support compliance activities in SLD conditions. Therefore, existing capabilities need to be augmented to include SLD conditions. In response to this need, NASA and its partners conceived a strategy or Roadmap for developing experimental and analytical SLD simulation tools. Following review and refinement by the airworthiness authorities and other international research partners, this technical strategy has been crystallized into a project plan to guide the SLD Engineering Tool Development effort. This paper will provide a brief overview of the latest version of the project plan and technical rationale, and provide a status of selected SLD Engineering Tool Development research tasks which are currently underway.
research, analysis, and technical assistance on municipal energy planning and policy, utility-scale Baseline Analysis of Municipal Codification across the U.S., NREL Technical Report (2016) Navajo Generating Station & Federal Resource Planning - Volume 1: Sectoral, Technical, and Economic Trends, NREL
Control of Technology Transfer at JPL
NASA Technical Reports Server (NTRS)
Oliver, Ronald
2006-01-01
Controlled Technology: 1) Design: preliminary or critical design data, schematics, technical flow charts, SNV code/diagnostics, logic flow diagrams, wirelist, ICDs, detailed specifications or requirements. 2) Development: constraints, computations, configurations, technical analyses, acceptance criteria, anomaly resolution, detailed test plans, detailed technical proposals. 3) Production: process or how-to: assemble, operated, repair, maintain, modify. 4) Manufacturing: technical instructions, specific parts, specific materials, specific qualities, specific processes, specific flow. 5) Operations: how-to operate, contingency or standard operating plans, Ops handbooks. 6) Repair: repair instructions, troubleshooting schemes, detailed schematics. 7) Test: specific procedures, data, analysis, detailed test plan and retest plans, detailed anomaly resolutions, detailed failure causes and corrective actions, troubleshooting, trended test data, flight readiness data. 8) Maintenance: maintenance schedules and plans, methods for regular upkeep, overhaul instructions. 9) Modification: modification instructions, upgrades kit parts, including software
ERIC Educational Resources Information Center
System Development Corp., Santa Monica, CA.
A national data program for the marine environment is recommended. Volume 2 includes: (1) objectives, scope, and methodology; (2) summary of the technical development plan; (3) agency development plans - Great Lakes and coastal development and (4) marine data network development plans. (Author)
Valls-Serrano, C; Verdejo-García, A; Caracuel, A
2016-05-01
Polysubstance use is associated with alterations in different components of executive functioning such as working memory and response inhibition. Nevertheless, less attention has been given to executive planning skills, which are required to benefit of low structured interventions. This study examines the association between severity of use of cocaine, heroin, alcohol, fluid and crystallized intelligence and planning tasks varying on degree of structure. Data were collected from 60 polysubstance users and 30 healthy controls. Cognitive assessment consisted of three planning tasks with different structure levels: Stockings of Cambridge, Zoo Map test, and Multiple Errands Test. Polysubstance users had significant planning deficits across the three tasks compared to healthy controls. Hierarchical regression models showed that severity of drug use and fluid and crystallized intelligence significantly explained performance in all the planning tasks. However, these associations were higher for low-structured real world tasks. These low-structured tasks also showed a unique association with crystallized but not fluid intelligence. Drug abuse is negatively associated with planning abilities, and intelligence is positively associated with planning performance in real-world tasks. Copyright © 2016 Elsevier Ireland Ltd. All rights reserved.
Zhang, Rubo; Yang, Yu
2017-01-01
Research on distributed task planning model for multi-autonomous underwater vehicle (MAUV). A scroll time domain quantum artificial bee colony (STDQABC) optimization algorithm is proposed to solve the multi-AUV optimal task planning scheme. In the uncertain marine environment, the rolling time domain control technique is used to realize a numerical optimization in a narrowed time range. Rolling time domain control is one of the better task planning techniques, which can greatly reduce the computational workload and realize the tradeoff between AUV dynamics, environment and cost. Finally, a simulation experiment was performed to evaluate the distributed task planning performance of the scroll time domain quantum bee colony optimization algorithm. The simulation results demonstrate that the STDQABC algorithm converges faster than the QABC and ABC algorithms in terms of both iterations and running time. The STDQABC algorithm can effectively improve MAUV distributed tasking planning performance, complete the task goal and get the approximate optimal solution. PMID:29186166
Li, Jianjun; Zhang, Rubo; Yang, Yu
2017-01-01
Research on distributed task planning model for multi-autonomous underwater vehicle (MAUV). A scroll time domain quantum artificial bee colony (STDQABC) optimization algorithm is proposed to solve the multi-AUV optimal task planning scheme. In the uncertain marine environment, the rolling time domain control technique is used to realize a numerical optimization in a narrowed time range. Rolling time domain control is one of the better task planning techniques, which can greatly reduce the computational workload and realize the tradeoff between AUV dynamics, environment and cost. Finally, a simulation experiment was performed to evaluate the distributed task planning performance of the scroll time domain quantum bee colony optimization algorithm. The simulation results demonstrate that the STDQABC algorithm converges faster than the QABC and ABC algorithms in terms of both iterations and running time. The STDQABC algorithm can effectively improve MAUV distributed tasking planning performance, complete the task goal and get the approximate optimal solution.
Under this task, technical support is provided to Regional Remedial Project Managers (RPMs)/On-Scene Coordinators (OSCs) at Superfund, RCRA, and Brownfields sites contaminated with hazardous materials by the Technical Support Center (TSC) for Monitoring and Site Characterization....
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-30
... Standard Technical Specification (STS): NUREG-1432, ``Standard Technical Specifications Combustion..., Washington, DC 20555- 0001. SUPPLEMENTARY INFORMATION: TSTF-426, Revision 5, is applicable to all Combustion...
Planning as an Iterative Process
NASA Technical Reports Server (NTRS)
Smith, David E.
2012-01-01
Activity planning for missions such as the Mars Exploration Rover mission presents many technical challenges, including oversubscription, consideration of time, concurrency, resources, preferences, and uncertainty. These challenges have all been addressed by the research community to varying degrees, but significant technical hurdles still remain. In addition, the integration of these capabilities into a single planning engine remains largely unaddressed. However, I argue that there is a deeper set of issues that needs to be considered namely the integration of planning into an iterative process that begins before the goals, objectives, and preferences are fully defined. This introduces a number of technical challenges for planning, including the ability to more naturally specify and utilize constraints on the planning process, the ability to generate multiple qualitatively different plans, and the ability to provide deep explanation of plans.
ERIC Educational Resources Information Center
Northern Montana Coll., Havre. Montana Center for Vocational Education, Research, Curriculum and Personnel Development.
This skills inventory for mining occupations was developed by a technical committee in Montana to assist in the development of model curricula and to address state labor market needs. The committee included employers from the mining industry, members of trade and professional associations, and educators. The validated task list and defined job…
Advanced Thermal Emission Imaging Systems Definition and Development
NASA Technical Reports Server (NTRS)
Blasius, Karl; Nava, David (Technical Monitor)
2002-01-01
Santa Barbara Remote Sensing (SBRS), Raytheon Company, is pleased to submit this quarterly progress report of the work performed in the third quarter of Year 2 of the Advanced THEMIS Project, July through September 2002. We review here progress in the proposed tasks. During July through September 2002 progress was made in two major tasks, Spectral Response Characterization and Flight Instrument Definition. Because of staffing problems and technical problems earlier in the program we have refocused the remaining time and budget on the key technical tasks. Current technical problems with a central piece of test equipment has lead us to request a 1 quarter extension to the period of performance. This request is being made through a separate letter independent of this report.
Presentation Of Comparative Data for Transportation Planning Studies
DOT National Transportation Integrated Search
1997-01-01
Clear, yet detailed, presentations of transportation planning data to lay groups as well as to technical groups is becoming more and more of a necessity in the planning process. Presentation of technical information in understandable terms has become...
7 CFR 4284.621 - Eligible grant purposes.
Code of Federal Regulations, 2011 CFR
2011-01-01
... by providing technical assistance for business development and economic development planning. Grant...-county economic development planning; (5) Establish centers for training, technology, and trade that will... professional services necessary to conduct the technical assistance, training, or planning functions. (b...
Ballhausen, Nicola; Mahy, Caitlin E V; Hering, Alexandra; Voigt, Babett; Schnitzspahn, Katharina M; Lagner, Prune; Ihle, Andreas; Kliegel, Matthias
2017-01-01
A minimal amount of research has examined the cognitive predictors of children's performance in naturalistic, errand-type planning tasks such as the Zoo Map task of the Behavioral Assessment of the Dysexecutive Syndrome for Children (BADS-C). Thus, the current study examined prospection (i.e., the ability to remember to carry out a future intention), executive functioning, and intelligence markers as predictors of performance in this widely used naturalistic planning task in 56 children aged 7- to 12-years-old. Measures of planning, prospection, inhibition, crystallized intelligence, and fluid intelligence were collected in an individual differences study. Regression analyses showed that prospection (rather than traditional measures of intelligence or inhibition) predicted planning, suggesting that naturalistic planning tasks such as the Zoo Map task may rely on future-oriented cognitive processes rather than executive problem solving or general knowledge.
Capability of Rolling Efficiency for 100M High-Speed Rails
DOE Office of Scientific and Technical Information (OSTI.GOV)
Huang, Howard
2014-03-22
OG Technologies, Inc. (OGT), along with its academic and industrial partners, proposes this CORE project for the Capability of Rolling Efficiency for 100m high-speed rails. The goal is to establish the competitive advantage, and thus the sustainability of the US-based rail manufacturers by greatly enhanced efficiency through innovative in-line metrology technology, in-depth process knowledge, and advanced process control to overcome detrimental factors such as higher labor costs that are saddling the US manufacturing sector. This Phase I project was carried out by an industrial-academia team over 9 months. The R&D team successfully completed all technical tasks and accomplished the objectivesmore » for the Phase I. In addition to the technical efforts, the introductory information of this project as well as anticipated progress was disseminated to steel mills interested in the project. The Phase I project has established the technical and commercial basis for additional development. There are needs to further completing the in-line sensing capability, deepening the capability of metamodeling, and supporting the process monitoring and control. The R&D team plans to submit a Phase II proposal based on the findings.« less
New Directions for High School Career and Technical Education in Wyoming: A Strategic Plan
ERIC Educational Resources Information Center
Hoachlander, Gary; Klein, Steven; Studier, Carol
2007-01-01
This report offers a plan for improving career and technical education (CTE) in Wyoming, but it is about more than just technical education. Realizing the potential of CTE to contribute to students' mastery of both academic and technical knowledge depends not only on strengthening the CTE curriculum, but also on embedding CTE in a larger program…
ERIC Educational Resources Information Center
Klose, Traugott
Major reforms brought about in July 1969 at the Free University of Berlin in its organization, planning, and decision making are reviewed. Specific problems are addressed, such as plans for introducing an information system on technical data and space use, plans for an information system on personnel employed by the university, and plans for an…
ERIC Educational Resources Information Center
Colombo Plan Bureau (Sri Lanka).
Focusing on the last in a series of seven seminars conducted by the Colombo Plan Bureau between 1969 and 1975 on the theme, "National Planning of Vocational and Technical Training," this report presents the proceedings of a seminar on the vocational education and training needs of one of the Colombo Plan members, Bhutan. Five working…
EARLY ENTRANCE COPRODUCTION PLANT
DOE Office of Scientific and Technical Information (OSTI.GOV)
David Storm; Govanon Nongbri; Steve Decanio
2004-01-12
The overall objective of this project is the three phase development of an Early Entrance Coproduction Plant (EECP) which uses petroleum coke to produce at least one product from at least two of the following three categories: (1) electric power (or heat), (2) fuels, and (3) chemicals using ChevronTexaco's proprietary gasification technology. The objective of Phase I is to determine the feasibility and define the concept for the EECP located at a specific site; develop a Research, Development, and Testing (RD&T) Plan to mitigate technical risks and barriers; and prepare a Preliminary Project Financing Plan. The objective of Phase IImore » is to implement the work as outlined in the Phase I RD&T Plan to enhance the development and commercial acceptance of coproduction technology. The objective of Phase III is to develop an engineering design package and a financing and testing plan for an EECP located at a specific site. The project's intended result is to provide the necessary technical, economic, and environmental information needed by industry to move the EECP forward to detailed design, construction, and operation. The partners in this project are Texaco Energy Systems LLC or TES (a subsidiary of ChevronTexaco), General Electric (GE), Praxair, and Kellogg Brown & Root (KBR) in addition to the U.S. Department of Energy (DOE). TES is providing gasification technology and Fischer-Tropsch (F-T) technology developed by Rentech, Inc., GE is providing combustion turbine technology, Praxair is providing air separation technology, and KBR is providing engineering. During Phase I, a design basis for the Fischer-Tropsch Synthesis section was developed based on limited experience with the specified feed gas and operating conditions. The objective of this Task in Phase II RD&T work was to confirm the performance of the F-T reactor at the set design conditions. Although much of the research, development, and testing work were done by TES outside of this project, several important issues were addressed in this phase of the project. They included Rejuvenation/Regeneration of the Fischer-Tropsch Catalyst, online Catalyst Withdrawal and Addition from the synthesis reactor, and the Fischer-Tropsch Design Basis Confirmation. In Phase III the results from these RD&T work will be incorporated in developing the engineering design package. This Topical Report documents the Phase II RD&T work that was completed for this task.« less
The Design, Planning and Control of Robotic Systems in Space
NASA Technical Reports Server (NTRS)
Dubowsky, Steven
1996-01-01
In the future, robotic systems will be expected to perform important tasks in space, in orbit and in planetary exploration. In orbit, current technology requires that tasks such as the repair, construction and maintenance of space stations and satellites be performed by astronaut Extra Vehicular Activity (EVA). Eliminating, the need for astronaut EVA through the use of space manipulators would greatly reduce both mission costs and hazards to astronauts. In planetary exploration, cost and logistical considerations clearly make the use of autonomous and telerobotic systems also very attractive, even in cases where an astronaut explorer might be in the area. However, such applications introduce a number of technical problems not found in conventional earth-bound industrial robots. To design useful and practical systems to meet the needs of future space missions, substantial technical development is required, including in the areas of the design, control and planning. The objectives of this research program were to develop such design paradigms and control and planning algorithms to enable future space robotic systems to meet their proposed mission objectives. The underlying intellectual focus of the program is to construct a set of integrated design, planning and control techniques based on an understanding of the fundamental mechanics of space robotic systems. This work was to build upon the results obtained in our previous research in this area supported by NASA Langley Research Center in which we have made important contributions to the area of space robotics. This program was proposed and accepted as a three year research program, a period of time necessary to make the type of fundamental developments to make a significant contributions to space robotics. Unfortunately, less than a year into the program it became clear that the NASA Langley Research Center would be forced by budgetary constraints to essentially leave this area of research. As a result, the total funding we received under this grant represented approximately one year of the original, proposed and approved, funding. For some time, there was substantial uncertainty that even this very reduced level of funding would be provided. The spending of the reduced available funds was spread just over two years to provide the support to permit the MS students who had joined the program to receive their master's degree and terminate their studies in this area.
ERIC Educational Resources Information Center
Amiryousefi, Mohammad
2017-01-01
The current study aimed at investigating the effects of three types of prewriting planning conditions, namely teacher-monitored collaborative planning (TMCP), student-led collaborative planning (SLCP), and individual planning (IP) on EFL learners' computer-mediated L2 written production and learning transfer from a pedagogic task to a new task of…
Development of an Updated Strategic Marketing Plan for Fox Valley Technical College.
ERIC Educational Resources Information Center
May, Susan A.
This project was conducted to develop a comprehensive strategic marketing plan for Fox Valley Technical College (FVTC). Components included a review of the literature, establishing criteria for the plan, validation of the criteria, the actual development of the plan involving a formative committee, and the review of institutional marketing plans…
Rousseau, Joseph P.; Landa, Edward R.; Nimmo, John R.; Cecil, L. DeWayne; Knobel, LeRoy L.; Glynn, Pierre D.; Kwicklis, Edward M.; Curtis, Gary P.; Stollenwerk, Kenneth G.; Anderson, Steven R.; Bartholomay, Roy C.; Bossong, Clifford R.; Orr, Brennon R.
2005-01-01
The U.S. Department of Energy (DOE) requested that the U.S. Geological Survey conduct an independent technical review of the Interim Risk Assessment (IRA) and Contaminant Screening for the Waste Area Group 7 (WAG-7) Remedial Investigation, the draft Addendum to the Work Plan for Operable Unit 7-13/14 WAG-7 comprehensive Remedial Investigation and Feasibility Study (RI/FS), and supporting documents that were prepared by Lockheed Martin Idaho Technologies, Inc. The purpose of the technical review was to assess the data and geotechnical approaches that were used to estimate future risks associated with the release of the actinides americium, uranium, neptunium, and plutonium to the Snake River Plain aquifer from wastes buried in pits and trenches at the Subsurface Disposal Area (SDA). The SDA is located at the Radioactive Waste Management Complex in southeastern Idaho within the boundaries of the Idaho National Engineering and Environmental Laboratory. Radionuclides have been buried in pits and trenches at the SDA since 1957 and 1952, respectively. Burial of transuranic wastes was discontinued in 1982. The five specific tasks associated with this review were defined in a ?Proposed Scope of Work? prepared by the DOE, and a follow-up workshop held in June 1998. The specific tasks were (1) to review the radionuclide sampling data to determine how reliable and significant are the reported radionuclide detections and how reliable is the ongoing sampling program, (2) to assess the physical and chemical processes that logically can be invoked to explain true detections, (3) to determine if distribution coefficients that were used in the IRA are reliable and if they have been applied properly, (4) to determine if transport model predictions are technically sound, and (5) to identify issues needing resolution to determine technical adequacy of the risk assessment analysis, and what additional work is required to resolve those issues.
Palter, Vanessa N; Grantcharov, Teodor P
2014-03-01
The purpose of this study was to investigate whether individualized deliberate practice on a virtual reality (VR) simulator results in improved technical performance in the operating room. Training on VR simulators has been shown to improve technical performance in the operating room (OR). Currently described VR curricula consist of trainees practicing the same tasks until expert proficiency is reached. It has yet to be investigated whether the individualized deliberate practice, where curricula tasks vary depending on prior levels of technical proficiency, would translate into the OR. This single-blinded prospective trial randomized 16 novice surgical residents to a deliberate practice (DP) group and a conventional residency training group. Both groups performed a laparoscopic cholecystectomy in the OR that was video-recorded. Technical performance of DP group residents in the OR was assessed using 3 validated assessment tools. A score of less than 60% on any component of the assessment tool resulted in the trainee practicing a specific task on the VR simulator. The DP group practiced on the simulator as per their individualized schedule. Both groups then performed another laparoscopic cholecystectomy. A blinded expert assessed the OR recordings using a validated global rating scale. Although both groups had similar technical abilities preintervention [DP: median score, 13.5 (9.3-15.0); control: median score, 14.5 (9.3-17.8); P = 0.45], the DP residents had a superior technical performance postintervention [DP: median score, 17.0 (15.3-18.5); control: median score, 12.5 (7.5-14.0); P = 0.03]. Of 8 DP residents, 6 practiced 5 basic VR tasks (median 1 trial to pass), and 7 of 8 practiced 2 advanced tasks (median 4 trials to pass). A curriculum of deliberate individualized practice on a VR simulator improves technical performance in the OR. This has implications to greatly improve the feasibility of implementing simulation-based curricula in residency training programs, rather then having them being limited to research protocols.
Yanaoka, Kaichi
2016-02-01
This research examined the effects of planning and executive functions on young children's (ages 3-to 5-years) strategies in changing scripts. Young children (N = 77) performed a script task (doll task), three executive function tasks (DCCS, red/blue task, and nine box task), a planning task, and a receptive vocabulary task. In the doll task, young children first enacted a "changing clothes" script, and then faced a situation in which some elements of the script were inappropriate. They needed to enact a script by compensating inappropriate items for the other-script items or by changing to the other script in advance. The results showed that shifting, a factor of executive function, had a positive influence on whether young children could compensate inappropriate items. In addition, planning was also an important factor that helped children to change to the other script in advance. These findings suggest that shifting and planning play different roles in using the two strategies appropriately when young children enact scripts in unexpected situations.
Acquisition plan for Digital Document Storage (DDS) prototype system
NASA Technical Reports Server (NTRS)
1990-01-01
NASA Headquarters maintains a continuing interest in and commitment to exploring the use of new technology to support productivity improvements in meeting service requirements tasked to the NASA Scientific and Technical Information (STI) Facility, and to support cost effective approaches to the development and delivery of enhanced levels of service provided by the STI Facility. The DDS project has been pursued with this interest and commitment in mind. It is believed that DDS will provide improved archival blowback quality and service for ad hoc requests for paper copies of documents archived and serviced centrally at the STI Facility. It will also develop an operating capability to scan, digitize, store, and reproduce paper copies of 5000 NASA technical reports archived annually at the STI Facility and serviced to the user community. Additionally, it will provide NASA Headquarters and field installations with on-demand, remote, electronic retrieval of digitized, bilevel, bit mapped report images along with branched, nonsequential retrieval of report subparts.
ERIC Educational Resources Information Center
Piri, Faramarz; Barati, Hossein; Ketabi, Saeed
2012-01-01
Previous studies on the effect of planning on language production have revealed that planning does have a positive effect on language performance in terms of fluency, complexity, and accuracy. The present study was an attempt to investigate the effects of pre-task, on-line, and both pre-task and on-line planning on fluency, accuracy, and…
Eriksson, J; Ek, A; Johansson, G
2000-03-01
A software prototype to support the planning process for adapting home and work environments for people with physical disabilities was designed and later evaluated. The prototype exploits low-cost three-dimensional (3-D) graphics products in the home computer market. The essential features of the prototype are: interactive rendering with optional hardware acceleration, interactive walk-throughs, direct manipulation tools for moving objects and measuring distances, and import of 3-D-objects from a library. A usability study was conducted, consisting of two test sessions (three weeks apart) and a final interview. The prototype was then tested and evaluated by representatives of future users: five occupational therapist students, and four persons with physical disability, with no previous experience of the prototype. Emphasis in the usability study was placed on the prototype's efficiency and learnability. We found that it is possible to realise a planning tool for environmental adaptations, both regarding usability and technical efficiency. The usability evaluation confirms our findings from previous case studies, regarding the relevance and positive attitude towards this kind of planning tool. Although the prototype was found to be satisfactorily efficient for the basic tasks, the paper presents several suggestions for improvement of future prototype versions.
1991-02-01
to adequately assess the health and environmental risks associated with the closure and transfer of the Annex forI other use; and 3) identification of...1990); Draft Final Technical Plan, Draft Final Sampling Design Plan and Draft Final Health and Safety Plan, USATHAMA, June 1990. 2.1.2 Draft Final...Final Technical Plan, Sampling Design Plan and Health and Safety Plan) supplied by USATHAMA. The estimate may be revised, with USATHAMA approval, as
The K-8 Aeronautics Internet Testbook: Project Plan-Year 3
NASA Technical Reports Server (NTRS)
Pallis, Jani Macari
1997-01-01
The Project Plan - Year 3 includes: the major tasks and milestones, the assignment of tasks, and the key personnel assigned to each task, a description of the milestone and major task, and the deliverables for the project. Milestones have project numbers ending in "0.0", such as "25.0.0 Phase III Development". Major tasks under that milestone begin with the same first number such as, "25.0.1 Develop Future Of Aeronautics". The assignment of tasks included in the Year 3 project plan contains the names of the key personnel responsible for the task and others participating on the task. Although the PI has the overall and ultimately responsible for all the tasks and milestones, the name of the first individual on a task or milestone is the person responsible for that task. Other names listed under that task will be participating on the task. Since there are two individuals at Cislunar Aerospace, Inc. with the name "J. Pallis", the principal investigator, Jani Macari Pallis is designated as PI in the Project Plan and James Pallis is designated as J. Pallis.
Site systems engineering fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.2
DOE Office of Scientific and Technical Information (OSTI.GOV)
GRYGIEL, M.L.
1998-10-08
Manage the Site Systems Engineering process to provide a traceable integrated requirements-driven, and technically defensible baseline. Through the Site Integration Group(SIG), Systems Engineering ensures integration of technical activities across all site projects. Systems Engineering's primary interfaces are with the RL Project Managers, the Project Direction Office and with the Project Major Subcontractors, as well as with the Site Planning organization. Systems Implementation: (1) Develops, maintains, and controls the site integrated technical baseline, ensures the Systems Engineering interfaces between projects are documented, and maintain the Site Environmental Management Specification. (2) Develops and uses dynamic simulation models for verification of the baselinemore » and analysis of alternatives. (3) Performs and documents fictional and requirements analyses. (4) Works with projects, technology management, and the SIG to identify and resolve technical issues. (5) Supports technical baseline information for the planning and budgeting of the Accelerated Cleanup Plan, Multi-Year Work Plans, Project Baseline Summaries as well as performance measure reporting. (6) Works with projects to ensure the quality of data in the technical baseline. (7) Develops, maintains and implements the site configuration management system.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hasbrouck, J.C.
1992-11-01
Chem-Nuclear Geotech, Inc. (Geotech), operating contractor for the US Department of Energy Grand Junction Projects Office, is conducting the Integrated Geophysics Program for Non-Intrusive Characterization of Mixed-Waste Landfill Sites (Technical Task Plan [TTP] AL921102). The TTP is part of the Mixed-Waste Landfill Integrated Demonstration (MWLID). The objective of this task was to demonstrate that an integrated program of surface geophysics can be used to effectively and nonintrusively characterize n-mixed-waste landfill sites. To accomplish this objective, integrated field demonstrations were conducted over two previously identified areas of interest (designated Areas A and B) within the MWLID test site at the Chemicalmore » Waste Landfill (CWL), Technical Area 3, at the Sandia National Laboratories, Albuquerque, New Mexico (Figures 1 and 2). Area A was centered roughly around the Chromic Acid and Organics Pits in the southeast-central portion of the landfill and Area B was centered around the ``60`s Pits`` area in the northeast-central portion of the landfill. Pit locations were known in Area A and suspected in Area B. This progress report describes the geophysical surveys conducted by Geotech and presents preliminary displays and analyses. Volume 2 of this report contains the raw data for all the surveys conducted by Geotech for this TTP.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hasbrouck, J.C.
1992-11-01
Chem-Nuclear Geotech, Inc. (Geotech), operating contractor for the US Department of Energy Grand Junction Projects Office, is conducting the Integrated Geophysics Program for Non-Intrusive Characterization of Mixed-Waste Landfill Sites (Technical Task Plan [TTP] AL921102). The TTP is part of the Mixed-Waste Landfill Integrated Demonstration (MWLID). The objective of this task was to demonstrate that an integrated program of surface geophysics can be used to effectively and nonintrusively characterize n-mixed-waste landfill sites. To accomplish this objective, integrated field demonstrations were conducted over two previously identified areas of interest (designated Areas A and B) within the MWLID test site at the Chemicalmore » Waste Landfill (CWL), Technical Area 3, at the Sandia National Laboratories, Albuquerque, New Mexico (Figures 1 and 2). Area A was centered roughly around the Chromic Acid and Organics Pits in the southeast-central portion of the landfill and Area B was centered around the 60's Pits'' area in the northeast-central portion of the landfill. Pit locations were known in Area A and suspected in Area B. This progress report describes the geophysical surveys conducted by Geotech and presents preliminary displays and analyses. Volume 2 of this report contains the raw data for all the surveys conducted by Geotech for this TTP.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fix, N. J.
The scope of the CH2M Hill Plateau Remediation Company, LLC (CHPRC) Groundwater and Technical Integration Support (Master Project) is for Pacific Northwest National Laboratory staff to provide technical and integration support to CHPRC. This work includes conducting investigations at the 300-FF-5 Operable Unit and other groundwater operable units, and providing strategic integration, technical integration and assessments, remediation decision support, and science and technology. The projects under this Master Project will be defined and included within the Master Project throughout the fiscal year, and will be incorporated into the Master Project Plan. This Quality Assurance Management Plan provides the quality assurancemore » requirements and processes that will be followed by the CHPRC Groundwater and Technical Integration Support (Master Project) and all releases associated with the CHPRC Soil and Groundwater Remediation Project. The plan is designed to be used exclusively by project staff.« less
Validating the Electric Maze Task as a Measure of Planning
ERIC Educational Resources Information Center
Sheppard, Kelly W.; Cheatham, Carol L.
2017-01-01
The Electric Maze Task (EMT) is a novel planning task designed to allow flexible testing of planning abilities across a broad age range and to incorporate manipulations to test underlying planning abilities, such as working-memory and inhibitory control skills. The EMT was tested in a group of 63 typically developing 7- to 12-year-olds.…
Planning and Enacting Mathematical Tasks of High Cognitive Demand in the Primary Classroom
ERIC Educational Resources Information Center
Georgius, Kelly
2013-01-01
This study offers an examination of two primary-grades teachers as they learn to transfer knowledge from professional development into their classrooms. I engaged in planning sessions with each teacher to help plan tasks of high cognitive demand, including anticipating and planning for classroom discourse that would occur around the task. A…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gauglitz, Phillip A.; Bontha, Jagannadha R.; Daniel, Richard C.
The Hanford Waste Treatment and Immobilization Plant (WTP) is currently being designed and constructed to pretreat and vitrify a large portion of the waste in the 177 underground waste storage tanks at the Hanford Site. A number of technical issues related to the design of the pretreatment facility (PTF) of the WTP have been identified. These issues must be resolved prior to the U.S. Department of Energy (DOE) Office of River Protection (ORP) reaching a decision to proceed with engineering, procurement, and construction activities for the PTF. One of the issues is Technical Issue T1 - Hydrogen Gas Release frommore » Vessels (hereafter referred to as T1). The focus of T1 is identifying controls for hydrogen release and completing any testing required to close the technical issue. In advance of selecting specific controls for hydrogen gas safety, a number of preliminary technical studies were initiated to support anticipated future testing and to improve the understanding of hydrogen gas generation, retention, and release within PTF vessels. These activities supported the development of a plan defining an overall strategy and approach for addressing T1 and achieving technical endpoints identified for T1. Preliminary studies also supported the development of a test plan for conducting testing and analysis to support closing T1. Both of these plans were developed in advance of selecting specific controls, and in the course of working on T1 it was decided that the testing and analysis identified in the test plan were not immediately needed. However, planning activities and preliminary studies led to significant technical progress in a number of areas. This report summarizes the progress to date from the preliminary technical studies. The technical results in this report should not be used for WTP design or safety and hazards analyses and technical results are marked with the following statement: “Preliminary Technical Results for Planning – Not to be used for WTP Design or Safety Analyses.”« less
ERIC Educational Resources Information Center
Amasuomo, Japo Oweikeye Morto; Alio, Abigail Ngozi
2013-01-01
The study investigated daylight illumination in the school workshop as a determinant for effective students' task performance in workshop practice. 183 NCE Technical students in 300 Level which comprised of 73 and 112 students from Federal Colleges of Education (Technical), Asaba and Omoku, Nigeria respectively during the 2008/2009 academic…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-12
... modeling demonstration should include supporting technical analyses and descriptions of all relevant....5 and NO X . The attainment demonstration includes: Technical analyses that locate, identify, and... modeling analysis is a complex technical evaluation that began with selection of the modeling system. The...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-17
... the timeframe provided in the statute. It must also include supporting technical analyses and... emissions inventory (EI), a woodstove air pollution control calculation, and a technical analysis showing... year (2010); and (2) an attainment demonstration consisting of: (a) Technical analyses that locate...
Safety Standards Plan for Middlesex County Vocational & Technical High Schools.
ERIC Educational Resources Information Center
Sommer, Cy
This vocational education safety standards plan outlines rules and regulations adopted by the Board of Education of Middlesex County Vocational and Technical High Schools. The first of eleven chapters presents demographics and a safety organization table for Middlesex County Vocational and Technical Schools. In chapter 2, six safety program…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-29
...: Application for Technical Assistance for Community Planning and Development (CPD) Programs. OMB Approval... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5480-N-71] Notice of Submission of Proposed Information Collection to OMB; Application for Technical Assistance for Community Planning and...
Krage, Ralf; Zwaan, Laura; Tjon Soei Len, Lian; Kolenbrander, Mark W; van Groeningen, Dick; Loer, Stephan A; Wagner, Cordula; Schober, Patrick
2017-11-01
Non-technical skills, such as task management, leadership, situational awareness, communication and decision-making refer to cognitive, behavioural and social skills that contribute to safe and efficient team performance. The importance of these skills during cardiopulmonary resuscitation (CPR) is increasingly emphasised. Nonetheless, the relationship between non-technical skills and technical performance is poorly understood. We hypothesise that non-technical skills become increasingly important under stressful conditions when individuals are distracted from their tasks, and investigated the relationship between non-technical and technical skills under control conditions and when external stressors are present. In this simulator-based randomised cross-over study, 30 anaesthesiologists and anaesthesia residents from the VU University Medical Center, Amsterdam, the Netherlands, participated in two different CPR scenarios in random order. In one scenario, external stressors (radio noise and a distractive scripted family member) were added, while the other scenario without stressors served as control condition. Non-technical performance of the team leader and technical performance of the team were measured using the 'Anaesthetists' Non-technical Skill' score and a recently developed technical skills score. Analysis of variance and Pearson correlation coefficients were used for statistical analyses. Non-technical performance declined when external stressors were present (adjusted mean difference 3.9 points, 95% CI 2.4 to 5.5 points). A significant correlation between non-technical and technical performance scores was observed when external stressors were present (r=0.67, 95% CI 0.40 to 0.83, p<0.001), while no evidence for such a relationship was observed under control conditions (r=0.15, 95% CI -0.22 to 0.49, p=0.42). This was equally true for all individual domains of the non-technical performance score (task management, team working, situation awareness, decision-making). During CPR with external stressors, the team's technical performance is related to the non-technical skills of the team leader. This may have important implications for training of CPR teams. © Article author(s) (or their employer(s) unless otherwise stated in the text of the article) 2017. All rights reserved. No commercial use is permitted unless otherwise expressly granted.
Krage, Ralf; Zwaan, Laura; Tjon Soei Len, Lian; Kolenbrander, Mark W; van Groeningen, Dick; Loer, Stephan A; Wagner, Cordula; Schober, Patrick
2017-01-01
Background Non-technical skills, such as task management, leadership, situational awareness, communication and decision-making refer to cognitive, behavioural and social skills that contribute to safe and efficient team performance. The importance of these skills during cardiopulmonary resuscitation (CPR) is increasingly emphasised. Nonetheless, the relationship between non-technical skills and technical performance is poorly understood. We hypothesise that non-technical skills become increasingly important under stressful conditions when individuals are distracted from their tasks, and investigated the relationship between non-technical and technical skills under control conditions and when external stressors are present. Methods In this simulator-based randomised cross-over study, 30 anaesthesiologists and anaesthesia residents from the VU University Medical Center, Amsterdam, the Netherlands, participated in two different CPR scenarios in random order. In one scenario, external stressors (radio noise and a distractive scripted family member) were added, while the other scenario without stressors served as control condition. Non-technical performance of the team leader and technical performance of the team were measured using the ‘Anaesthetists’ Non-technical Skill’ score and a recently developed technical skills score. Analysis of variance and Pearson correlation coefficients were used for statistical analyses. Results Non-technical performance declined when external stressors were present (adjusted mean difference 3.9 points, 95% CI 2.4 to 5.5 points). A significant correlation between non-technical and technical performance scores was observed when external stressors were present (r=0.67, 95% CI 0.40 to 0.83, p<0.001), while no evidence for such a relationship was observed under control conditions (r=0.15, 95% CI −0.22 to 0.49, p=0.42). This was equally true for all individual domains of the non-technical performance score (task management, team working, situation awareness, decision-making). Conclusions During CPR with external stressors, the team’s technical performance is related to the non-technical skills of the team leader. This may have important implications for training of CPR teams. PMID:28844039
Pellissippi State Technical Community College Five-Year Strategic Planning Directions, 1998-2003.
ERIC Educational Resources Information Center
Pellissippi State Technical Community Coll., Knoxville, TN.
The document contains the strategic plan for Pellissippi State Technical Community College (Tennessee). The previous five-year strategic plan, "The Pathfinder Project," was prepared in 1994 but was out of date before the end of the five-year planning cycle. To secure information for projecting new five-year strategic directions and goals…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-01
... Market and Planning Efficiency Through Improved Software; Notice of Agenda and Procedures for Staff... planning models and software. The technical conference will be held from 8 a.m. to 5:30 p.m. (EDT) on June.... Agenda for AD10-12 Staff Technical Conference on Planning Models and Software Federal Energy Regulatory...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fix, N. J.
The scope of the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project) is to provide technical and integration support to Fluor Hanford, Inc., including operable unit investigations at 300-FF-5 and other groundwater operable units, strategic integration, technical integration and assessments, remediation decision support, and science and technology. This Quality Assurance Management Plan provides the quality assurance requirements and processes that will be followed by the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project).
Pulsed Lidar Performance/Technical Maturity Assessment
NASA Technical Reports Server (NTRS)
Gimmestad, Gary G.; West, Leanne L.; Wood, Jack W.; Frehlich, Rod
2004-01-01
This report describes the results of investigations performed by the Georgia Tech Research Institute (GTRI) and the National Center for Atmospheric Research (NCAR) under a task entitled 'Pulsed Lidar Performance/Technical Maturity Assessment' funded by the Crew Systems Branch of the Airborne Systems Competency at the NASA Langley Research Center. The investigations included two tasks, 1.1(a) and 1.1(b). The Tasks discussed in this report are in support of the NASA Virtual Airspace Modeling and Simulation (VAMS) program and are designed to evaluate a pulsed lidar that will be required for active wake vortex avoidance solutions. The Coherent Technologies, Inc. (CTI) WindTracer LIDAR is an eye-safe, 2-micron, coherent, pulsed Doppler lidar with wake tracking capability. The actual performance of the WindTracer system was to be quantified. In addition, the sensor performance has been assessed and modeled, and the models have been included in simulation efforts. The WindTracer LIDAR was purchased by the Federal Aviation Administration (FAA) for use in near-term field data collection efforts as part of a joint NASA/FAA wake vortex research program. In the joint research program, a minimum common wake and weather data collection platform will be defined. NASA Langley will use the field data to support wake model development and operational concept investigation in support of the VAMS project, where the ultimate goal is to improve airport capacity and safety. Task 1.1(a), performed by NCAR in Boulder, Colorado to analyze the lidar system to determine its performance and capabilities based on results from simulated lidar data with analytic wake vortex models provided by NASA, which were then compared to the vendor's claims for the operational specifications of the lidar. Task 1.1(a) is described in Section 3, including the vortex model, lidar parameters and simulations, and results for both detection and tracking of wake vortices generated by Boeing 737s and 747s. Task 1.1(b) was performed by GTRI in Atlanta, Georgia and is described in Section 4. Task 1.1(b) includes a description of the St. Louis Airport (STL) field test being conducted by the Volpe National Transportation Systems Center, and it also addresses the development of a test plan to validate simulation studies conducted as part of Task 1.1(a). Section 4.2 provides a description of the Volpe STL field tests, and Section 4.3 describes 3 possible ways to validate the WindTracer lidar simulations performed in Task 1.1(a).
Configuration Management Plan for the Tank Farm Contractor
DOE Office of Scientific and Technical Information (OSTI.GOV)
WEIR, W.R.
The Configuration Management Plan for the Tank Farm Contractor describes configuration management the contractor uses to manage and integrate its technical baseline with the programmatic and functional operations to perform work. The Configuration Management Plan for the Tank Farm Contractor supports the management of the project baseline by providing the mechanisms to identify, document, and control the technical characteristics of the products, processes, and structures, systems, and components (SSC). This plan is one of the tools used to identify and provide controls for the technical baseline of the Tank Farm Contractor (TFC). The configuration management plan is listed in themore » management process documents for TFC as depicted in Attachment 1, TFC Document Structure. The configuration management plan is an integrated approach for control of technical, schedule, cost, and administrative processes necessary to manage the mission of the TFC. Configuration management encompasses the five functional elements of: (1) configuration management administration, (2) configuration identification, (3) configuration status accounting, (4) change control, and (5 ) configuration management assessments.« less
Investigating the Effects of Planning on L2 Text Chat Performance
ERIC Educational Resources Information Center
Hsu, Hsiu-Chen
2012-01-01
Over the last decade, a small body of SLA research has examined the effects of task planning on L2 production. This research has revealed positive results concerning the effect of pre-task and online planning on oral and written production. However, no studies to date have investigated the joint effects of pre-task and online planning. In…
Establishment of a National Wind Energy Center at University of Houston
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wang, Su Su
The DOE-supported project objectives are to: establish a national wind energy center (NWEC) at University of Houston and conduct research to address critical science and engineering issues for the development of future large MW-scale wind energy production systems, especially offshore wind turbines. The goals of the project are to: (1) establish a sound scientific/technical knowledge base of solutions to critical science and engineering issues for developing future MW-scale large wind energy production systems, (2) develop a state-of-the-art wind rotor blade research facility at the University of Houston, and (3) through multi-disciplinary research, introducing technology innovations on advanced wind-turbine materials, processing/manufacturingmore » technology, design and simulation, testing and reliability assessment methods related to future wind turbine systems for cost-effective production of offshore wind energy. To achieve the goals of the project, the following technical tasks were planned and executed during the period from April 15, 2010 to October 31, 2014 at the University of Houston: (1) Basic research on large offshore wind turbine systems (2) Applied research on innovative wind turbine rotors for large offshore wind energy systems (3) Integration of offshore wind-turbine design, advanced materials and manufacturing technologies (4) Integrity and reliability of large offshore wind turbine blades and scaled model testing (5) Education and training of graduate and undergraduate students and post- doctoral researchers (6) Development of a national offshore wind turbine blade research facility The research program addresses both basic science and engineering of current and future large wind turbine systems, especially offshore wind turbines, for MW-scale power generation. The results of the research advance current understanding of many important scientific issues and provide technical information for solving future large wind turbines with advanced design, composite materials, integrated manufacturing, and structural reliability and integrity. The educational program have trained many graduate and undergraduate students and post-doctoral level researchers to learn critical science and engineering of wind energy production systems through graduate-level courses and research, and participating in various projects in center’s large multi-disciplinary research. These students and researchers are now employed by the wind industry, national labs and universities to support the US and international wind energy industry. The national offshore wind turbine blade research facility developed in the project has been used to support the technical and training tasks planned in the program to accomplish their goals, and it is a national asset which is available for used by domestic and international researchers in the wind energy arena.« less
Freydefont, Laure; Gollwitzer, Peter M; Oettingen, Gabriele
2016-09-01
Two experiments investigate the influence of goal and implementation intentions on effort mobilization during task performance. Although numerous studies have demonstrated the beneficial effects of setting goals and making plans on performance, the effects of goals and plans on effort-related cardiac activity and especially the cardiac preejection period (PEP) during goal striving have not yet been addressed. According to the Motivational Intensity Theory, participants should increase effort mobilization proportionally to task difficulty as long as success is possible and justified. Forming goals and making plans should allow for reduced effort mobilization when participants perform an easy task. However, when the task is difficult, goals and plans should differ in their effect on effort mobilization. Participants who set goals should disengage, whereas participants who made if-then plans should stay in the field showing high effort mobilization during task performance. As expected, using an easy task in Experiment 1, we observed a lower cardiac PEP in both the implementation intention and the goal intention condition than in the control condition. In Experiment 2, we varied task difficulty and demonstrated that while participants with a mere goal intention disengaged from difficult tasks, participants with an implementation intention increased effort mobilization proportionally with task difficulty. These findings demonstrate the influence of goal striving strategies (i.e., mere goals vs. if-then plans) on effort mobilization during task performance. Copyright © 2016 Elsevier B.V. All rights reserved.
Review of sensors for the in situ chemical characterization of the Hanford underground storage tanks
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kyle, K.R.; Mayes, E.L.
1994-07-29
Lawrence Livermore National Laboratory (LLNL), in the Technical Task Plan (TTP) SF-2112-03 subtask 2, is responsible for the conceptual design of a Raman probe for inclusion in the in-tank cone penetrometer. As part of this task, LLNL is assigned the further responsibility of generating a report describing a review of sensor technologies other than Raman that can be incorporated in the in-tank cone penetrometer for the chemical analysis of the tank environment. These sensors would complement the capabilities of the Raman probe, and would give information on gaseous, liquid, and solid state species that are insensitive to Raman interrogation. Thismore » work is part of a joint effort involving several DOE laboratories for the design and development of in-tank cone penetrometer deployable systems for direct UST waste characterization at Westinghouse Hanford Company (WHC) under the auspices of the U.S. Department of Energy (DOE) Underground Storage Tank Integrated Demonstration (UST-ID).« less
Reft, Chester; Alecu, Rodica; Das, Indra J; Gerbi, Bruce J; Keall, Paul; Lief, Eugene; Mijnheer, Ben J; Papanikolaou, Nikos; Sibata, Claudio; Van Dyk, Jake
2003-06-01
This document is the report of a task group of the Radiation Therapy Committee of the AAPM and has been prepared primarily to advise hospital physicists involved in external beam treatment of patients with pelvic malignancies who have high atomic number (Z) hip prostheses. The purpose of the report is to make the radiation oncology community aware of the problems arising from the presence of these devices in the radiation beam, to quantify the dose perturbations they cause, and, finally, to provide recommendations for treatment planning and delivery. Some of the data and recommendations are also applicable to patients having implanted high-Z prosthetic devices such as pins, humeral head replacements. The scientific understanding and methodology of clinical dosimetry for these situations is still incomplete. This report is intended to reflect the current state of scientific understanding and technical methodology in clinical dosimetry for radiation oncology patients with high-Z hip prostheses.
Coordinating complex decision support activities across distributed applications
NASA Technical Reports Server (NTRS)
Adler, Richard M.
1994-01-01
Knowledge-based technologies have been applied successfully to automate planning and scheduling in many problem domains. Automation of decision support can be increased further by integrating task-specific applications with supporting database systems, and by coordinating interactions between such tools to facilitate collaborative activities. Unfortunately, the technical obstacles that must be overcome to achieve this vision of transparent, cooperative problem-solving are daunting. Intelligent decision support tools are typically developed for standalone use, rely on incompatible, task-specific representational models and application programming interfaces (API's), and run on heterogeneous computing platforms. Getting such applications to interact freely calls for platform independent capabilities for distributed communication, as well as tools for mapping information across disparate representations. Symbiotics is developing a layered set of software tools (called NetWorks! for integrating and coordinating heterogeneous distributed applications. he top layer of tools consists of an extensible set of generic, programmable coordination services. Developers access these services via high-level API's to implement the desired interactions between distributed applications.
Group Task Force on Satellite Rescue and Repair
NASA Astrophysics Data System (ADS)
1992-09-01
The Group Task Force was chartered by the Administrator of NASA to recommend 'a policy outlining the criteria, the design standards, and the pricing model to guide NASA in assessing the responsibilities for government and nongovernment Satellite Rescue and Repair Missions.' Criteria for accepting such missions, risks, and benefits to all sectors of our economy involved in satellite services, adequacy of planning and training, and the impact on NASA's primary mission were reviewed. The Group began by asking a more fundamental question; is satellite rescue and repair a logical element of NASA's mission? Factors considered were: (1) the probability of rescue or repair opportunities arising; (2) the economic justification for such attempts; (3) the benefits to NASA, both from such ad hoc learning experiences in space operations and the impact on the public perception of NASA; (4) the effect of such unanticipated missions on NASA's scheduled activities; (5) any potential effect on NASA's technical capability to work in space; and (6) any potential effect on U.S. economic competitiveness.
Group Task Force on Satellite Rescue and Repair
NASA Technical Reports Server (NTRS)
1992-01-01
The Group Task Force was chartered by the Administrator of NASA to recommend 'a policy outlining the criteria, the design standards, and the pricing model to guide NASA in assessing the responsibilities for government and nongovernment Satellite Rescue and Repair Missions.' Criteria for accepting such missions, risks, and benefits to all sectors of our economy involved in satellite services, adequacy of planning and training, and the impact on NASA's primary mission were reviewed. The Group began by asking a more fundamental question; is satellite rescue and repair a logical element of NASA's mission? Factors considered were: (1) the probability of rescue or repair opportunities arising; (2) the economic justification for such attempts; (3) the benefits to NASA, both from such ad hoc learning experiences in space operations and the impact on the public perception of NASA; (4) the effect of such unanticipated missions on NASA's scheduled activities; (5) any potential effect on NASA's technical capability to work in space; and (6) any potential effect on U.S. economic competitiveness.
DRACO Flowpath Performance and Environments
NASA Technical Reports Server (NTRS)
Komar, D. R.; McDonald, Jon
1999-01-01
The Advanced Space Transportation (AST) project office has challenged NASA to design, manufacture, ground-test and flight-test an axisymmetric, hydrocarbon-fueled, flight-weight, ejector-ramjet engine system testbed no later than 2005. To accomplish this, a multi-center NASA team has been assembled. The goal of this team, led by NASA-Marshall Space Flight Center (MSFC), is to develop propulsion technologies that demonstrate rocket and airbreathing combined-cycle operation (DRACO). Current technical activities include flowpath conceptual design, engine systems conceptual design, and feasibility studies investigating the integration and operation of the DRACO engine with a Lockheed D-21B drone. This paper focuses on the activities of the Flowpath Systems Product Development Team (PDT), led by NASA-Glenn Research Center (GRC) and supported by NASA-MSFC and TechLand Research, Inc. The objective of the Flowpath PDT at the start of the DRACO program was to establish a conceptual design of the flowpath aerodynamic lines, determine the preliminary performance, define the internal environments, and support the DRACO testbed concept feasibility studies. To accomplish these tasks, the PDT convened to establish a baseline flowpath concept. With the conceptual lines defined, cycle analysis tasks were planned and the flowpath performance and internal environments were defined. Additionally, sensitivity studies investigating the effects of inlet reference area, combustion performance, and combustor/nozzle materials selection were performed to support the Flowpath PDT design process. Results of these tasks are the emphasis of this paper and are intended to verify the feasibility of the DRACO flowpath and engine system as well as identify the primary technical challenges inherent in the flight-weight design of an advanced propulsion technology demonstration engine. Preliminary cycle performance decks were developed to support the testbed concept feasibility studies but are not discussed further in this paper.
Configuration Management Plan for K Basins
DOE Office of Scientific and Technical Information (OSTI.GOV)
Weir, W.R.; Laney, T.
This plan describes a configuration management program for K Basins that establishes the systems, processes, and responsibilities necessary for implementation. The K Basins configuration management plan provides the methodology to establish, upgrade, reconstitute, and maintain the technical consistency among the requirements, physical configuration, and documentation. The technical consistency afforded by this plan ensures accurate technical information necessary to achieve the mission objectives that provide for the safe, economic, and environmentally sound management of K Basins and the stored material. The configuration management program architecture presented in this plan is based on the functional model established in the DOE Standard, DOE-STD-1073-93,more » {open_quotes}Guide for Operational Configuration Management Program{close_quotes}.« less
Engineering, technical, and management support services
NASA Technical Reports Server (NTRS)
1994-01-01
This report summarizes by task the engineering, technical, and management support services provided by Vitro Corporation to NASA Headquarters Office of Safety, Reliability, Maintainability, and Quality Assurance (now called Office of Safety and Mission Assurance (OSMA)) (Code Q) under Contract Number NASW-4311 from the period February 10, 1994. Each task summary includes significant Vitro accomplishments, conclusions, and recommendations for future efforts in each of the divisions within OSMA.
Technical architecture of ONC-approved plans for statewide health information exchange.
Barrows, Randolph C; Ezzard, John
2011-01-01
ONC-approved state plans for HIE were reviewed for descriptions and depictions of statewide HIE technical architecture. Review was complicated by non-standard organizational elements and technical terminology across state plans. Findings were mapped to industry standard, referenced, and defined HIE architecture descriptions and characteristics. Results are preliminary due to the initial subset of ONC-approved plans available, the rapid pace of new ONC-plan approvals, and continuing advancements in standards and technology of HIE, etc. Review of 28 state plans shows virtually all include a direct messaging component, but for participating entities at state-specific levels of granularity (RHIO, enterprise, organization/provider). About ½ of reviewed plans describe a federated architecture, and ¼ of plans utilize a single-vendor "hybrid-federated" architecture. About 1/3 of states plan to leverage new federal and open exchange technologies (DIRECT, CONNECT, etc.). Only one plan describes a centralized architecture for statewide HIE, but others combine central and federated architectural approaches.
Technical Architecture of ONC-Approved Plans For Statewide Health Information Exchange
Barrows, Randolph C.; Ezzard, John
2011-01-01
ONC-approved state plans for HIE were reviewed for descriptions and depictions of statewide HIE technical architecture. Review was complicated by non-standard organizational elements and technical terminology across state plans. Findings were mapped to industry standard, referenced, and defined HIE architecture descriptions and characteristics. Results are preliminary due to the initial subset of ONC-approved plans available, the rapid pace of new ONC-plan approvals, and continuing advancements in standards and technology of HIE, etc. Review of 28 state plans shows virtually all include a direct messaging component, but for participating entities at state-specific levels of granularity (RHIO, enterprise, organization/provider). About ½ of reviewed plans describe a federated architecture, and ¼ of plans utilize a single-vendor “hybrid-federated” architecture. About 1/3 of states plan to leverage new federal and open exchange technologies (DIRECT, CONNECT, etc.). Only one plan describes a centralized architecture for statewide HIE, but others combine central and federated architectural approaches. PMID:22195059
Development of Hydrogen Education Programs for Government Officials
DOE Office of Scientific and Technical Information (OSTI.GOV)
Baxter, Shannon; Keller, Russ
1. Subcontractor/Technical Subject Matter Expert (Tasks 1-3) 2. Technical lead for LFG cleanup and hydrogen production systems Support for Feasibility Study 3. Technical Lead for Feasibility Study Coordination of site preparation activities for all project equipment 4. Host site
The Effects of Guided vs. Unguided Pressured Planning on EFL Learners' Writing Fluency
ERIC Educational Resources Information Center
Mohammadnia, Zhila; Ayaz, Parisa
2015-01-01
Task-based planning can be conceptualized as the opportunity to work out task performance before the actual performance. It allows learners to process the content and language of their planned production at a deeper and more meaningful level. In the face of the wide range of research conducted on the effects of pre-task planning on L2 production,…
40 CFR 52.1690 - Small business technical and environmental compliance assistance program.
Code of Federal Regulations, 2010 CFR
2010-07-01
... (CONTINUED) New York § 52.1690 Small business technical and environmental compliance assistance program. On January 11, 1993, the New York State Department of Environmental Conservation submitted a plan for the... Assistance Program for incorporation in the New York state implementation plan. This plan meets the...
40 CFR 52.2732 - Small business technical and environmental compliance assistance program.
Code of Federal Regulations, 2014 CFR
2014-07-01
... (CONTINUED) Puerto Rico § 52.2732 Small business technical and environmental compliance assistance program. On November 16, 1992, the Puerto Rico Environmental Quality Board submitted a plan for the... Assistance Program for incorporation in the Puerto Rico state implementation plan. This plan meets the...
40 CFR 52.2732 - Small business technical and environmental compliance assistance program.
Code of Federal Regulations, 2011 CFR
2011-07-01
... (CONTINUED) Puerto Rico § 52.2732 Small business technical and environmental compliance assistance program. On November 16, 1992, the Puerto Rico Environmental Quality Board submitted a plan for the... Assistance Program for incorporation in the Puerto Rico state implementation plan. This plan meets the...
40 CFR 52.2732 - Small business technical and environmental compliance assistance program.
Code of Federal Regulations, 2010 CFR
2010-07-01
... (CONTINUED) Puerto Rico § 52.2732 Small business technical and environmental compliance assistance program. On November 16, 1992, the Puerto Rico Environmental Quality Board submitted a plan for the... Assistance Program for incorporation in the Puerto Rico state implementation plan. This plan meets the...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-12
... Information Collection: Comment Request; Technical Assistance for Community Planning and Development Programs AGENCY: Office of the Assistant Secretary for Community Planning And Development, HUD. ACTION: Notice... Community Planning and Development, Department of Housing Urban and Development, 451 7th Street, SW., Room...
DOT National Transportation Integrated Search
1995-12-01
Development Center in evaluating current Coast Guard policies and development plans for : Waterways Management, a "Waterways Management Research and Planning" task plan was : established as Task Area A in FY '94. The purpose of this task area is to d...
Two Approaches to Measuring Task Interdependence in Elementary Schools.
ERIC Educational Resources Information Center
Charters, W. W., Jr.
This report compares two approaches to measuring task interdependence, a theoretically fruitful concept for analyzing an organization's technical system. Task interdependence exists among operating personnel in the degree that task performance of one operative constrains, augments, or otherwise poses contingencies for the performance of another.…
Transforming South-South technical support to fight noncommunicable diseases.
Shakow, Aaron D A; Bukhman, Gene; Adebona, Olumuyiwa; Greene, Jeremy; de Dieu Ngirabega, Jean; Binagwaho, Agnès
2012-03-01
At the UN High-Level Meeting on non-communicable diseases (NCD) in September 2011, each member state was challenged to create a multisectoral national policy and plan for the prevention and control of non-communicable disease by 2013. Few low-income countries, however, currently have such plans. Their governments are likely to turn for assistance in drafting and implementation to multilateral agencies and Contract Technical Support Organizations recommended by development partners. Yet because many NCD seen in the lowest-income countries differ significantly from those prevalent elsewhere, existing providers of external technical support may lack the necessary experience to support strategic planning for NCD interventions in these settings. This article reviews currently available mechanisms of technical support for health sector planning. It places them in the broader historical context of post- World War II international development assistance and the more recent campaigns for horizontal "South-South" cooperation and aid effectiveness. It proposes bilateral technical assistance by low income-countries themselves as the natural evolution of development assistance in health. Such programs, it argues, may be able to improve the quality of technical support to low-income countries for strategic planning in the NCD area while directing resources to the regions where they are most needed. Copyright © 2012 World Heart Federation (Geneva). Published by Elsevier B.V. All rights reserved.
Sharma, Anjali; Chiliade, Philippe; Michael Reyes, E; Thomas, Kate K; Collens, Stephen R; Rafael Morales, José
2013-12-13
In 2008, the US government mandated that HIV/AIDS care and treatment programs funded by the US President's Emergency Plan for AIDS Relief (PEPFAR) should shift from US-based international partners (IPs) to registered locally owned organizations (local partners, or LPs). The US Health Resources and Services Administration (HRSA) developed the Clinical Assessment for Systems Strengthening (ClASS) framework for technical assistance in resource-constrained settings. The ClASS framework involves all stakeholders in the identification of LPs' strengths and needs for technical assistance. This article examines the role of ClASS in building capacity of LPs that can endure and adapt to changing financial and policy environments. All stakeholders (n=68) in Kenya, Zambia, and Nigeria who had participated in the ClASS from LPs and IPs, the US Centers for Disease Control and Prevention (CDC), and, in Nigeria, HIV/AIDS treatment facilities (TFs) were interviewed individually or in groups (n=42) using an open-ended interview guide. Thematic analysis revealed stakeholder perspectives on ClASS-initiated changes and their sustainability. Local organizations were motivated to make changes in internal operations with the ClASS approach, PEPFAR's competitive funding climate, organizational goals, and desired patient health outcomes. Local organizations drew on internal resources and, if needed, technical assistance from IPs. Reportedly, ClASS-initiated changes and remedial action plans made LPs more competitive for PEPFAR funding. LPs also attributed their successful funding applications to their preexisting systems and reputation. Bureaucracy, complex and competing tasks, and staff attrition impeded progress toward the desired changes. Although CDC continues to provide technical assistance through IPs, declining PEPFAR funds threaten the consolidation of gains, smooth program transition, and continuity of treatment services. The well-timed adaptation and implementation of ClASS successfully engaged stakeholders who committed their own resources toward strengthening organizational capacity. The sustainability of built capacity depends on continued investment in leadership, staff retention, and quality improvement.
Sharma, Anjali; Chiliade, Philippe; Reyes, E. Michael; Thomas, Kate K.; Collens, Stephen R.; Morales, José Rafael
2013-01-01
Background In 2008, the US government mandated that HIV/AIDS care and treatment programs funded by the US President's Emergency Plan for AIDS Relief (PEPFAR) should shift from US-based international partners (IPs) to registered locally owned organizations (local partners, or LPs). The US Health Resources and Services Administration (HRSA) developed the Clinical Assessment for Systems Strengthening (ClASS) framework for technical assistance in resource-constrained settings. The ClASS framework involves all stakeholders in the identification of LPs’ strengths and needs for technical assistance. Objective This article examines the role of ClASS in building capacity of LPs that can endure and adapt to changing financial and policy environments. Design All stakeholders (n=68) in Kenya, Zambia, and Nigeria who had participated in the ClASS from LPs and IPs, the US Centers for Disease Control and Prevention (CDC), and, in Nigeria, HIV/AIDS treatment facilities (TFs) were interviewed individually or in groups (n=42) using an open-ended interview guide. Thematic analysis revealed stakeholder perspectives on ClASS-initiated changes and their sustainability. Results Local organizations were motivated to make changes in internal operations with the ClASS approach, PEPFAR's competitive funding climate, organizational goals, and desired patient health outcomes. Local organizations drew on internal resources and, if needed, technical assistance from IPs. Reportedly, ClASS-initiated changes and remedial action plans made LPs more competitive for PEPFAR funding. LPs also attributed their successful funding applications to their preexisting systems and reputation. Bureaucracy, complex and competing tasks, and staff attrition impeded progress toward the desired changes. Although CDC continues to provide technical assistance through IPs, declining PEPFAR funds threaten the consolidation of gains, smooth program transition, and continuity of treatment services. Conclusions The well-timed adaptation and implementation of ClASS successfully engaged stakeholders who committed their own resources toward strengthening organizational capacity. The sustainability of built capacity depends on continued investment in leadership, staff retention, and quality improvement. PMID:24331715
Surgical Practical Skills Learning Curriculum: Implementation and Interns' Confidence Perceptions.
Acosta, Danilo; Castillo-Angeles, Manuel; Garces-Descovich, Alejandro; Watkins, Ammara A; Gupta, Alok; Critchlow, Jonathan F; Kent, Tara S
To provide an overview of the practical skills learning curriculum and assess its effects over time on the surgical interns' perceptions of their technical skills, patient management, administrative tasks, and knowledge. An 84-hour practical skills curriculum composed of didactic, simulation, and practical sessions was implemented during the 2015 to 2016 academic year for general surgery interns. Totally, 40% of the sessions were held during orientation, whereas the remainder sessions were held throughout the academic year. Interns' perceptions of their technical skills, administrative tasks, patient management, and knowledge were assessed by the practical skills curriculum residents' perception survey at various time points during their intern year (baseline, midpoint, and final). Interns were also asked to fill out an evaluation survey at the completion of each session to obtain feedback on the curriculum. General Surgery Residency program at a tertiary care academic institution. 20 General Surgery categorical and preliminary interns. Significant differences were found over time in interns' perceptions on their technical skills, patient management, administrative tasks, and knowledge (p < 0.001 for all). The results were also statistically significant when accounting for a prior boot camp course in medical school, intern status (categorical or preliminary), and gender (p < 0.05 for all). Differences in interns' perceptions occurred both from baseline to midpoint, and from midpoint to final time point evaluations (p < 0.001 for all). Prior surgical boot camp in medical school status, intern status (categorical vs. preliminary), and gender did not differ in the interns' baseline perceptions of their technical skills, patient management, administrative tasks, and knowledge (p > 0.05 for all). Implementation of a Practical Skills Curriculum in surgical internships can improve interns' confidence perception on their technical skills, patient management skills, administrative tasks, and knowledge. Copyright © 2018. Published by Elsevier Inc.
NASA Technical Reports Server (NTRS)
Digman, R. Michael
1988-01-01
The components necessary for the success of the commercialization of an Ada Technology Transition Network are reported in detail. The organizational plan presents the planned structure for services development and technical transition of AdaNET services to potential user communities. The Business Plan is the operational plan for the AdaNET service as a commercial venture. The Technical Plan is the plan from which the AdaNET can be designed including detailed requirements analysis. Also contained is an analysis of user fees and charges, and a proposed user fee schedule.
NASA Technical Reports Server (NTRS)
Keitz, J. F.
1982-01-01
The impact of more timely and accurate weather data on airline flight planning with the emphasis on fuel savings is studied. This summary report discusses the results of each of the four major tasks of the study. Task 1 compared airline flight plans based on operational forecasts to plans based on the verifying analyses and found that average fuel savings of 1.2 to 2.5 percent are possible with improved forecasts. Task 2 consisted of similar comparisons but used a model developed for the FAA by SRI International that simulated the impact of ATc diversions on the flight plans. While parts of Task 2 confirm the Task I findings, inconsistency with other data and the known impact of ATC suggests that other Task 2 findings are the result of errors in the model. Task 3 compares segment weather data from operational flight plans with the weather actually observed by the aircraft and finds the average error could result in fuel burn penalties (or savings) of up to 3.6 percent for the average 8747 flight. In Task 4 an in-depth analysis of the weather forecast for the 33 days included in the study finds that significant errors exist on 15 days. Wind speeds in the area of maximum winds are underestimated by 20 to 50 kts., a finding confirmed in the other three tasks.
ERIC Educational Resources Information Center
Yildiz, Mine; Yesilyurt, Savas
2017-01-01
Based on Robinson's Triadic Componential Framework and the definition of task planning by Ellis (2005), this study was carried out to find out the effects of task planning and rhetorical mode on lexical and syntactic complexity, and overall writing quality of writing production of EFL learners. Following a repeated-measures design, the present…
The Method of Multiple Spatial Planning Basic Map
NASA Astrophysics Data System (ADS)
Zhang, C.; Fang, C.
2018-04-01
The "Provincial Space Plan Pilot Program" issued in December 2016 pointed out that the existing space management and control information management platforms of various departments were integrated, and a spatial planning information management platform was established to integrate basic data, target indicators, space coordinates, and technical specifications. The planning and preparation will provide supportive decision support, digital monitoring and evaluation of the implementation of the plan, implementation of various types of investment projects and space management and control departments involved in military construction projects in parallel to approve and approve, and improve the efficiency of administrative approval. The space planning system should be set up to delimit the control limits for the development of production, life and ecological space, and the control of use is implemented. On the one hand, it is necessary to clarify the functional orientation between various kinds of planning space. On the other hand, it is necessary to achieve "multi-compliance" of various space planning. Multiple spatial planning intergration need unified and standard basic map(geographic database and technical specificaton) to division of urban, agricultural, ecological three types of space and provide technical support for the refinement of the space control zoning for the relevant planning. The article analysis the main space datum, the land use classification standards, base map planning, planning basic platform main technical problems. Based on the geographic conditions, the results of the census preparation of spatial planning map, and Heilongjiang, Hainan many rules combined with a pilot application.
Technical Excellence: A Requirement for Good Engineering
NASA Technical Reports Server (NTRS)
Gill, Paul S.; Vaughan, William W.
2008-01-01
Technical excellence is a requirement for good engineering. Technical excellence has many different ways of expressing itself within engineering. NASA has initiatives that address the enhancement of the Agency's technical excellence and thrust to maintain the associated high level of performance by the Agency on current programs/projects and as it moves into the Constellation Program and the return to the Moon with plans to visit Mars. This paper addresses some of the key initiatives associated with NASA's technical excellence thrust. Examples are provided to illustrate some results being achieved and plans to enhance these initiatives.
Asymptotically Optimal Motion Planning for Learned Tasks Using Time-Dependent Cost Maps
Bowen, Chris; Ye, Gu; Alterovitz, Ron
2015-01-01
In unstructured environments in people’s homes and workspaces, robots executing a task may need to avoid obstacles while satisfying task motion constraints, e.g., keeping a plate of food level to avoid spills or properly orienting a finger to push a button. We introduce a sampling-based method for computing motion plans that are collision-free and minimize a cost metric that encodes task motion constraints. Our time-dependent cost metric, learned from a set of demonstrations, encodes features of a task’s motion that are consistent across the demonstrations and, hence, are likely required to successfully execute the task. Our sampling-based motion planner uses the learned cost metric to compute plans that simultaneously avoid obstacles and satisfy task constraints. The motion planner is asymptotically optimal and minimizes the Mahalanobis distance between the planned trajectory and the distribution of demonstrations in a feature space parameterized by the locations of task-relevant objects. The motion planner also leverages the distribution of the demonstrations to significantly reduce plan computation time. We demonstrate the method’s effectiveness and speed using a small humanoid robot performing tasks requiring both obstacle avoidance and satisfaction of learned task constraints. Note to Practitioners Motivated by the desire to enable robots to autonomously operate in cluttered home and workplace environments, this paper presents an approach for intuitively training a robot in a manner that enables it to repeat the task in novel scenarios and in the presence of unforeseen obstacles in the environment. Based on user-provided demonstrations of the task, our method learns features of the task that are consistent across the demonstrations and that we expect should be repeated by the robot when performing the task. We next present an efficient algorithm for planning robot motions to perform the task based on the learned features while avoiding obstacles. We demonstrate the effectiveness of our motion planner for scenarios requiring transferring a powder and pushing a button in environments with obstacles, and we plan to extend our results to more complex tasks in the future. PMID:26279642
ERIC Educational Resources Information Center
Innovative Systems Research, Inc., Pennsauken, NJ.
Twelve different conversion plans were delineated and evaluated in the performance of this study effort. An indepth technical, financial, and cost/benefit analysis was included. One plan was determined to be distinctively more cost-effective than any of the other plans because it provided a technically feasible system that assured the maximum…
NASA Technical Reports Server (NTRS)
Levack, Daniel J. H.
2000-01-01
The Alternate Propulsion Subsystem Concepts contract had seven tasks defined that are reported under this contract deliverable. The tasks were: FAA Restart Study, J-2S Restart Study, Propulsion Database Development. SSME Upper Stage Use. CERs for Liquid Propellant Rocket Engines. Advanced Low Cost Engines, and Tripropellant Comparison Study. The two restart studies, F-1A and J-2S, generated program plans for restarting production of each engine. Special emphasis was placed on determining changes to individual parts due to obsolete materials, changes in OSHA and environmental concerns, new processes available, and any configuration changes to the engines. The Propulsion Database Development task developed a database structure and format which is easy to use and modify while also being comprehensive in the level of detail available. The database structure included extensive engine information and allows for parametric data generation for conceptual engine concepts. The SSME Upper Stage Use task examined the changes needed or desirable to use the SSME as an upper stage engine both in a second stage and in a translunar injection stage. The CERs for Liquid Engines task developed qualitative parametric cost estimating relationships at the engine and major subassembly level for estimating development and production costs of chemical propulsion liquid rocket engines. The Advanced Low Cost Engines task examined propulsion systems for SSTO applications including engine concept definition, mission analysis. trade studies. operating point selection, turbomachinery alternatives, life cycle cost, weight definition. and point design conceptual drawings and component design. The task concentrated on bipropellant engines, but also examined tripropellant engines. The Tripropellant Comparison Study task provided an unambiguous comparison among various tripropellant implementation approaches and cycle choices, and then compared them to similarly designed bipropellant engines in the SSTO mission This volume overviews each of the tasks giving its objectives, main results. and conclusions. More detailed Final Task Reports are available on each individual task.
Design of impact-resistant boron/aluminum large fan blade
NASA Technical Reports Server (NTRS)
Salemme, C. T.; Yokel, S. A.
1978-01-01
The technical program was comprised of two technical tasks. Task 1 encompassed the preliminary boron/aluminum fan blade design effort. Two preliminary designs were evolved. An initial design consisted of 32 blades per stage and was based on material properties extracted from manufactured blades. A final design of 36 blades per stage was based on rule-of-mixture material properties. In Task 2, the selected preliminary blade design was refined via more sophisticated analytical tools. Detailed finite element stress analysis and aero performance analysis were carried out to determine blade material frequencies and directional stresses.
Task planning with uncertainty for robotic systems. Thesis
NASA Technical Reports Server (NTRS)
Cao, Tiehua
1993-01-01
In a practical robotic system, it is important to represent and plan sequences of operations and to be able to choose an efficient sequence from them for a specific task. During the generation and execution of task plans, different kinds of uncertainty may occur and erroneous states need to be handled to ensure the efficiency and reliability of the system. An approach to task representation, planning, and error recovery for robotic systems is demonstrated. Our approach to task planning is based on an AND/OR net representation, which is then mapped to a Petri net representation of all feasible geometric states and associated feasibility criteria for net transitions. Task decomposition of robotic assembly plans based on this representation is performed on the Petri net for robotic assembly tasks, and the inheritance of properties of liveness, safeness, and reversibility at all levels of decomposition are explored. This approach provides a framework for robust execution of tasks through the properties of traceability and viability. Uncertainty in robotic systems are modeled by local fuzzy variables, fuzzy marking variables, and global fuzzy variables which are incorporated in fuzzy Petri nets. Analysis of properties and reasoning about uncertainty are investigated using fuzzy reasoning structures built into the net. Two applications of fuzzy Petri nets, robot task sequence planning and sensor-based error recovery, are explored. In the first application, the search space for feasible and complete task sequences with correct precedence relationships is reduced via the use of global fuzzy variables in reasoning about subgoals. In the second application, sensory verification operations are modeled by mutually exclusive transitions to reason about local and global fuzzy variables on-line and automatically select a retry or an alternative error recovery sequence when errors occur. Task sequencing and task execution with error recovery capability for one and multiple soft components in robotic systems are investigated.
A Naval Task Force Performance Assessment Methodology
1991-11-01
methodology combines two fundamental and intuitively appealing approaches to problem solving: (1) the systems approach with its focus on a system as a whole...Naval Coastal Systems Center AD-A242 915 Panama City, Florida 32407-5000 IlhIIiRjjq TECHNICAL MEMORANDUM NCSC TM 592-91 NOVEMBER 1991 A NAVAL TASK... SYSTEMS CENTER PANAMA CITY, FLORIDA 32407-5000 CAPT DAVID P. FITCH, USN MR. TED C. BUCKLEY Commanding Officer Technical Director ADMINISTRATIVE
Heavy vehicle driver workload assessment. Task 3, task analysis data collection
DOT National Transportation Integrated Search
This technical report consists of a collection of task analytic data to support heavy vehicle driver workload assessment and protocol development. Data were collected from professional drivers to provide insights into the following issues: the meanin...
Advanced Mirror Technology Development (AMTD) Project Status
NASA Technical Reports Server (NTRS)
Stahl, H. Philip
2014-01-01
To date, AMTD Phase 1 has accomplished all of its technical tasks on-schedule and on-budget. AMTD was awarded a Phase 2 contract. We are now performing Phase 2 tasks along with those tasks continued from Phase 1.
Assessment of Ebola virus disease preparedness in the WHO South-East Asia Region.
Vong, Sirenda; Samuel, Reuben; Gould, Philip; El Sakka, Hammam; Rana, Bardan J; Pinyowiwat, Vason; Bezbaruah, Supriya; Ofrin, Roderico
2016-12-01
To conduct assessments of Ebola virus disease preparedness in countries of the World Health Organization (WHO) South-East Asia Region. Nine of 11 countries in the region agreed to be assessed. During February to November 2015 a joint team from WHO and ministries of health conducted 4-5 day missions to Bangladesh, Bhutan, Indonesia, Maldives, Myanmar, Nepal, Sri Lanka, Thailand and Timor-Leste. We collected information through guided discussions with senior technical leaders and visits to hospitals, laboratories and airports. We assessed each country's Ebola virus disease preparedness on 41 tasks under nine key components adapted from the WHO Ebola preparedness checklist of January 2015. Political commitment to Ebola preparedness was high in all countries. Planning was most advanced for components that had been previously planned or tested for influenza pandemics: multilevel and multisectoral coordination; multidisciplinary rapid response teams; public communication and social mobilization; drills in international airports; and training on personal protective equipment. Major vulnerabilities included inadequate risk assessment and risk communication; gaps in data management and analysis for event surveillance; and limited capacity in molecular diagnostic techniques. Many countries had limited planning for a surge of Ebola cases. Other tasks needing improvement included: advice to inbound travellers; adequate isolation rooms; appropriate infection control practices; triage systems in hospitals; laboratory diagnostic capacity; contact tracing; and danger pay to staff to ensure continuity of care. Joint assessment and feedback about the functionality of Ebola virus preparedness systems help countries strengthen their core capacities to meet the International Health Regulations.
Assessment of Ebola virus disease preparedness in the WHO South-East Asia Region
Samuel, Reuben; Gould, Philip; El Sakka, Hammam; Rana, Bardan J; Pinyowiwat, Vason; Bezbaruah, Supriya; Ofrin, Roderico
2016-01-01
Abstract Objective To conduct assessments of Ebola virus disease preparedness in countries of the World Health Organization (WHO) South-East Asia Region. Methods Nine of 11 countries in the region agreed to be assessed. During February to November 2015 a joint team from WHO and ministries of health conducted 4–5 day missions to Bangladesh, Bhutan, Indonesia, Maldives, Myanmar, Nepal, Sri Lanka, Thailand and Timor-Leste. We collected information through guided discussions with senior technical leaders and visits to hospitals, laboratories and airports. We assessed each country’s Ebola virus disease preparedness on 41 tasks under nine key components adapted from the WHO Ebola preparedness checklist of January 2015. Findings Political commitment to Ebola preparedness was high in all countries. Planning was most advanced for components that had been previously planned or tested for influenza pandemics: multilevel and multisectoral coordination; multidisciplinary rapid response teams; public communication and social mobilization; drills in international airports; and training on personal protective equipment. Major vulnerabilities included inadequate risk assessment and risk communication; gaps in data management and analysis for event surveillance; and limited capacity in molecular diagnostic techniques. Many countries had limited planning for a surge of Ebola cases. Other tasks needing improvement included: advice to inbound travellers; adequate isolation rooms; appropriate infection control practices; triage systems in hospitals; laboratory diagnostic capacity; contact tracing; and danger pay to staff to ensure continuity of care. Conclusion Joint assessment and feedback about the functionality of Ebola virus preparedness systems help countries strengthen their core capacities to meet the International Health Regulations. PMID:27994284
2009-06-01
Jefferson City, MO Phone:573-681-5126 E-mail: rooneyi(a>lincolnu.edu Principle Investigators for contract’s 5 Task Areas: Task I : James Rooney...identified Tasks all structured within a single contract. This contract contained Five Task areas: Task I was an administrative task; Task II-V were...Manager’s Overview of the Report (Task I ) 3. Summary Final Budget Invoice and Budget unspent balance 4. Technical Reports of the Research Tasks (II - V
ACT Plan: Technical Manual. 2013/2014
ERIC Educational Resources Information Center
ACT, Inc., 2013
2013-01-01
This manual contains information about the American College Test (ACT) Plan® program. The principal focus of this manual is to document the Plan program's technical adequacy in light of its intended purposes. This manual supersedes the 2011 edition. The content of this manual responds to requirements of the testing industry as established in the…
A Guide to Systematic Planning for Vocational and Technical Schools. Research 22.
ERIC Educational Resources Information Center
Meckley, Richard F.; And Others
A school planning scheme involving 46 principle activities which occur over a 38-month period is presented. This scheme was developed for individuals responsible for the planning of vocational and technical schools, i.e., supervisors, state staff, university school plant planners, architects, and local school administrators. The activities…
DOT National Transportation Integrated Search
2016-08-01
This document describes the Deployment Plan for the New York City Department of Transportation (NYC) Connected Vehicle Pilot Deployment (CVPD) Project. This plan describes the approach to complete Phase 2 Design/Build/Test, and Phase 3 Operate and Ma...
INDOT Technical Training Plan : [Technical Summary
DOT National Transportation Integrated Search
2012-01-01
A wide range of job classifications, increasing technical : performance expectations, licensing and certification requirements, : budget restrictions and frequent department : reorganization has made technical training of employees : more difficult, ...
Technical Writing Practically Unified through Industry.
ERIC Educational Resources Information Center
Houston, Linda S.
Two technical writing courses at a two-year agricultural college were designed to meet the individualized needs of students in various agricultural studies in the animal industries, horticulture, agricultural business, and agricultural mechanics. Offering a technical writing program based upon the writing tasks of the students' intended…
TurboTech Technical Evaluation Automated System
NASA Technical Reports Server (NTRS)
Tiffany, Dorothy J.
2009-01-01
TurboTech software is a Web-based process that simplifies and semiautomates technical evaluation of NASA proposals for Contracting Officer's Technical Representatives (COTRs). At the time of this reporting, there have been no set standards or systems for training new COTRs in technical evaluations. This new process provides boilerplate text in response to interview style questions. This text is collected into a Microsoft Word document that can then be further edited to conform to specific cases. By providing technical language and a structured format, TurboTech allows the COTRs to concentrate more on the actual evaluation, and less on deciding what language would be most appropriate. Since the actual word choice is one of the more time-consuming parts of a COTRs job, this process should allow for an increase in quantity of proposals evaluated. TurboTech is applicable to composing technical evaluations of contractor proposals, task and delivery orders, change order modifications, requests for proposals, new work modifications, task assignments, as well as any changes to existing contracts.
Exploration studies technical report, FY1988 status. Volume 1: Technical summary
NASA Technical Reports Server (NTRS)
1988-01-01
The Office of Exploration (OEXP) at NASA Headquarters has been tasked with defining and recommending alternatives for an early 1990's nationaL decision on a focused program of human exploration of the solar system. The Mission Analysis and System Engineering (MASE) group, which is managed by the Exploration Studies Office at the Lyndon B. Johnson Space Center, is responsible for coordinating the technical studies necessary for accomplishing such a task. This technical report, produced by the MASE, describes the process that has been developed in a case study approach. The four case studies developed in FY88 include: (1) Human Expedition to Phobos; (2) Human Expedition to Mars; (3) Lunar Observatory; and (4) Lunar Outpost to Early Mars Evolution. The final outcome of this effort is a set of programmatic and technical conclusions and recommendations for the following year's work.
Tanks Focus Area Site Needs Assessment - FY 2001
DOE Office of Scientific and Technical Information (OSTI.GOV)
Allen, Robert W.; Josephson, Gary B.; Westsik, Joseph H.
2001-04-30
The TFA uses a systematic process for developing its annual program that draws from the tanks science and technology development needs expressed by the five DOE tank waste sites. TFA's annual program development process is iterative and involves the following steps: Collection of site needs; Needs analysis; Development of technical responses and initial prioritization; Refinement of the program for the next fiscal year; Formulation of the Corporate Review Budget (CRB); Preparation of Program Execution Guidance (PEG) for the next FY Revision of the Multiyear Program Plan (MYPP). This document describes the outcomes of the first phase of this process, frommore » collection of site needs to the initial prioritization of technical activities. The TFA received site needs in October - December 2000. A total of 170 site needs were received, an increase of 30 over the previous year. The needs were analyzed and integrated, where appropriate. Sixty-six distinct technical responses were drafted and prioritized. In addition, seven strategic tasks were approved to compete for available funding in FY 2002 and FY 2003. Draft technical responses were prepared and provided to the TFA Site Representatives and the TFA User Steering Group (USG) for their review and comment. These responses were discussed at a March 15, 2001, meeting where the TFA Management Team established the priority listing in preparation for input to the DOE Office of Science and Technology (OST) budget process. At the time of publication of this document, the TFA continues to finalize technical responses as directed by the TFA Management Team and clarify the intended work scopes for FY 2002 and FY 2003.« less
TSCA Work Plan Chemical Technical Supplement – Physicochemical Properties and Environmental Fate of the Brominated Phthalates Cluster (BPC) Chemicals -- Brominated Phthalates Cluster Flame Retardants.
Planning a DSN support section technical library
NASA Technical Reports Server (NTRS)
Bailey, T.; Chatburn, C. C.
1980-01-01
The planning procedure being used to establish a technical library for the Deep Space Network support section is described. The inventory and survey methods employed are described and the preliminary results of these methods are discussed.
Efficient Symbolic Task Planning for Multiple Mobile Robots
2016-12-13
Efficient Symbolic Task Planning for Multiple Mobile Robots Yuqian Jiang December 13, 2016 Abstract Symbolic task planning enables a robot to make...high-level deci- sions toward a complex goal by computing a sequence of actions with minimum expected costs. This thesis builds on a single- robot ...time complexity of optimal planning for multiple mobile robots . In this thesis we first investigate the performance of the state-of-the-art solvers of
First annual report SHRP C103 task 4 : rapid repair techniques.
DOT National Transportation Integrated Search
1989-01-01
The objective of task four is to develop technically and economically feasible methods of concrete bridge deck protection, rehabilitation, and replacement. The objective of the task will be accomplished through a progression of six subtasks. The subt...
NASA Technical Reports Server (NTRS)
1980-01-01
The results of the Large Space Systems Technology special emphasis task are presented. The task was an analysis of structural requirements deriving from the initial Phase A Operational Geostationary Platform study.
Navigation: National Plans; NAVSTAR-GPS; Laser Gyros
1982-08-31
REFERENC-~CP STER . TECHNICAL REPORT ! "NO. 12686,-’-. - NAVIGATION: NATIONAL PLANS ; NAVSTAR-GPS; LASER GYROS CONTRACT NO. DAAK30-80-C-0073 31 AUGUST...Technical ReportAW Ng. riiNational Plans ; Navstar-GPS; S... : NavstarGPS; a3 Sept 1980 - 31 Aug 1982 ....Lasr Gyros. 6. PERFORMING ORG. REPORT NUMBER PRA...identify by block number) Navigation Navigation Satellites Laser Gyros Position-Location . NAVSTAR-GPS Fiberoptic Gyros Planning Global Positioning System
Technical assessment of Mir-1 life support hardware for the international space station
NASA Technical Reports Server (NTRS)
Mitchell, K. L.; Bagdigian, R. M.; Carrasquillo, R. L.; Carter, D. L.; Franks, G. D.; Holder, D. W., Jr.; Hutchens, C. F.; Ogle, K. Y.; Perry, J. L.; Ray, C. D.
1994-01-01
NASA has been progressively learning the design and performance of the Russian life support systems utilized in their Mir space station. In 1992, a plan was implemented to assess the benefits of the Mir-1 life support systems to the Freedom program. Three primary tasks focused on: evaluating the operational Mir-1 support technologies and understanding if specific Russian systems could be directly utilized on the American space station and if Russian technology design information could prove useful in improving the current design of the planned American life support equipment; evaluating the ongoing Russian life support technology development activities to determine areas of potential long-term application to the U.S. space station; and utilizing the expertise of their space station life support systems to evaluate the benefits to the current U.S. space station program which included the integration of the Russian Mir-1 designs with the U.S. designs to support a crew of six.
Assessment of avionics technology in European aerospace organizations
NASA Technical Reports Server (NTRS)
Martinec, D. A.; Baumbick, Robert; Hitt, Ellis; Leondes, Cornelius; Mayton, Monica; Schwind, Joseph; Traybar, Joseph
1992-01-01
This report provides a summary of the observations and recommendations made by a technical panel formed by the National Aeronautics and Space Administration (NASA). The panel, comprising prominent experts in the avionics field, was tasked to visit various organizations in Europe to assess the level of technology planned for use in manufactured civil avionics in the future. The primary purpose of the study was to assess avionics systems planned for implementation or already employed on civil aircraft and to evaluate future research, development, and engineering (RD&E) programs, address avionic systems and aircraft programs. The ultimate goal is to ensure that the technology addressed by NASa programs is commensurate with the needs of the aerospace industry at an international level. The panel focused on specific technologies, including guidance and control systems, advanced cockpit displays, sensors and data networks, and fly-by-wire/fly-by-light systems. However, discussions the panel had with the European organizations were not limited to these topics.
Supplement to a Methodology for Succession Planning for Technical Experts
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kirk, Bernadette Lugue; Cain, Ronald A.; Agreda, Carla L.
This report complements A Methodology for Succession Planning for Technical Experts (Ron Cain, Shaheen Dewji, Carla Agreda, Bernadette Kirk, July 2017), which describes a draft methodology for identifying and evaluating the loss of key technical skills at nuclear operations facilities. This report targets the methodology for identifying critical skills, and the methodology is tested through interviews with selected subject matter experts.
ERIC Educational Resources Information Center
Boyle, Todd A.
2007-01-01
In this article, the author proposes a body of knowledge that the educators can use to incorporate the technical aspects of enterprise resource planning (ERP) into an information systems (IS) program, encapsulated as the ERP technical knowledge framework. To illustrate the application of this framework, the author discusses a course sequence that…
ERIC Educational Resources Information Center
Farnsworth, Clayton
The principal of the Southern Nevada Vocational-Technical Center at Las Vegas, Nevada, briefly outlines its development and function. The facility cost approximately 3 million dollars and was built on 390 acres of land purchased from the Federal government. The PERT method was used in planning. Instructional facilities, including those for auto…
Multi-team dynamics and distributed expertise in imission operations.
Caldwell, Barrett S
2005-06-01
The evolution of space exploration has brought an increased awareness of the social and socio-technical issues associated with team performance and task coordination, both for the onboard astronauts and in mission control. Spaceflight operations create a unique environment in which to address classic group dynamics topics including communication, group process, knowledge development and sharing, and time-critical task performance. Mission operations in the early years of the 21st century have developed into a set of complex, multi-team task settings incorporating multiple mission control teams and flight crews interacting in novel ways. These more complex operational settings help highlight the emergence of a new paradigm of distributed supervisory coordination, and the need to consider multiple dimensions of expertise being supported and exchanged among team members. The creation of new mission profiles with very long-duration time scales (months, rather than days) for the International Space Station, as well as planned exploration missions to the Moon and Mars, emphasize fundamental distinctions from the 40 yr from Mercury to the Space Shuttle. Issues in distributed expertise and information flow in mission control settings from two related perspectives are described. A general conceptual view of knowledge sharing and task synchronization is presented within the context of the mission control environment. This conceptual presentation is supplemented by analysis of quasi-experimental data collected from actual flight controllers at NASA-Johnson Space Center, Houston, TX.
Ten rules for asset protection planning.
Adkisson, Jay D; Keller, Lawrence B
2013-12-01
Asset protection planning is a highly technical area of legal planning. Because of the fraudulent transfer laws, asset protection planning must be done in advance of any claim, be technically sound, not rely upon secrecy, and avoid any number of critical mistakes including keeping personal and business assets separate. Physicians who engage in asset protection planning must avoid critical mistakes, and not count on bankruptcy to provide relief from creditors. General rules and cautions for those who are considering the creation of an asset protection plan for their personal assets.
Evans, C H; Schneider, E; Shostrom, V; Schenarts, P J
2017-02-01
Today's medical learners are Millennials, and reportedly, multitasking pros. We aim to evaluate effect of multitasking on cognitive and technical skills. 16 medical students completed a mock page and laceration closure separately on day 1 and day 13, and in parallel on day 14. Suturing was graded using GRS and mock pages scored. Total time, suturing and loading times, and percent correct on mock page were compared. Percent correct on mock page improved from days 1-13 and 14 (p < 0.01 and 0.04). GRS improved from days 1-13 and 14 (p = 0.04 and <0.01). Total time suturing was similar on all days. However, time suturing during the mock page on day 14 was prolonged compared to before mock page (p = 0.01). Medical students can complete cognitive and technical tasks in parallel, without compromising acceptability. However, multitasking results in longer times to complete the complex component of the technical task. Copyright © 2016 Elsevier Inc. All rights reserved.
ERIC Educational Resources Information Center
O'Connor, Edward J.; And Others
Ninety subjects completed identical simulated maintenance tasks under two experimental conditions. In the high job structural attribute condition subjects were told that the task was high in learning new skills, responsibility, feedback, and task identity; while in the low job structural condition they were told the opposite. Results indicated the…
NASA Technical Reports Server (NTRS)
Hatterick, G. R.
1972-01-01
The data sheets presented contain the results of the task analysis portion of the study to identify skill requirements of space shuttle crew personnel. A comprehensive data base is provided of crew functions, operating environments, task dependencies, and task-skills applicable to a representative cross section of earth orbital research experiments.
Solar Energy Task Force Report: Technical Training Guidelines.
ERIC Educational Resources Information Center
O'Connor, Kevin
This task force report offers guidelines and information for the development of vocational education programs oriented to the commercial application of solar energy in water and space heating. After Section I introduces the Solar Energy Task Force and its activities, Section II outlines the task force's objectives and raises several issues and…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-11
... NUCLEAR REGULATORY COMMISSION [Project No. 753; NRC-2012-0019] Model Safety Evaluation for Plant... Regulatory Commission (NRC) is announcing the availability of the model safety evaluation (SE) for plant... the Improved Standard Technical Specification (ISTS), NUREG-1431, ``Standard Technical Specifications...
NASA Technical Reports Server (NTRS)
1974-01-01
The results of the LAGEOS thermal/optical/vibrational analysis and test program are reported. Through analyses and tests it is verified that the MSFC LAGEOS design provides a retroreflector thermal environment which maintains acceptable retroflector internal thermal gradients. The technical results of the study, organized by the major task areas are presented. The interrelationships of the major tasks are described and the major decisions are identified.
Northeast Artificial Intelligence Consortium (NAIC) Review of Technical Tasks. Volume 2, Part 2.
1987-07-01
A-A19 774 NORTHEAST ARTIFICIAL INTELLIGENCE CONSORTIUN (MIC) 1/5 YVIEN OF TEOICR. T.. (U) NORTHEAST ARTIFICIAL INTELLIGENCE CONSORTIUM SYRACUSE MY J...NORTHEAST ARTIFICIAL INTELLIGENCE CONSORTIUM (NAIC) *p,* ~ Review of Technical Tasks ,.. 12 PERSONAL AUTHOR(S) (See reverse) . P VI J.F. Allen, P.B. Berra...See reverse) /" I ABSTRACT (Coninue on ’.wrse if necessary and identify by block number) % .. *. -. ’ The Northeast Artificial Intelligence Consortium
Ground controlled robotic assembly operations for Space Station Freedom
NASA Technical Reports Server (NTRS)
Parrish, Joseph C.
1991-01-01
A number of dextrous robotic systems and associated positioning and transportation devices are available on Space Station Freedom (SSF) to perform assembly tasks that would otherwise need to be performed by extravehicular activity (EVA) crewmembers. The currently planned operating mode for these robotic systems during the assembly phase is teleoperation by intravehicular activity (IVA) crewmembers. While this operating mode is less hazardous and expensive than manned EVA operations, and has insignificant control loop time delays, the amount of IVA time available to support telerobotic operations is much less than the anticipated requirements. Some alternative is needed to allow the robotic systems to perform useful tasks without exhausting the available IVA resources; ground control is one such alternative. The issues associated with ground control of SSF robotic systems to alleviate onboard crew time availability constraints are investigated. Key technical issues include the effect of communication time delays, the need for safe, reliable execution of remote operations, and required modifications to the SSF ground and flight system architecture. Time delay compensation techniques such as predictive displays and world model-based force reflection are addressed and collision detection and avoidance strategies to ensure the safety of the on-orbit crew, Orbiter, and SSF are described. Although more time consuming and difficult than IVA controlled teleoperations or manned EVA, ground controlled telerobotic operations offer significant benefits during the SSF assembly phase, and should be considered in assembly planning activities.
NASA Technical Reports Server (NTRS)
1976-01-01
Contractural requirements, project planning, equipment specifications, and technical data for space shuttle biological experiment payloads are presented. Topics discussed are: (1) urine collection and processing on the space shuttle, (2) space processing of biochemical and biomedical materials, (3) mission simulations, and (4) biomedical equipment.
U.C. Davis high energy particle physics research: Technical progress report -- 1990
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
Summaries of progress made for this period is given for each of the following areas: (1) Task A--Experiment, H1 detector at DESY; (2) Task C--Experiment, AMY detector at KEK; (3) Task D--Experiment, fixed target detectors at Fermilab; (4) Task F--Experiment, PEP detector at SLAC and pixel detector; (5) Task B--Theory, particle physics; and (6) Task E--Theory, particle physics.
Immediate and Sustained Effects of Planning in a Problem-Solving Task
ERIC Educational Resources Information Center
Delaney, Peter F.; Ericsson, K. Anders; Knowles, Martin E.
2004-01-01
In 4 experiments, instructions to plan a task (water jugs) that normally produces little planning altered how participants solved the problems and resulted in enhanced learning and memory. Experiment 1 identified planning strategies that allowed participants to plan full solutions to water jugs problems. Experiment 2 showed that experience with…
Synthetic fuels: an industry struggles to be born amidst the perils of techno-econo-politics
DOE Office of Scientific and Technical Information (OSTI.GOV)
Heyman, M.
1976-04-01
Despite active planning for a variety of large-scale synthetic fuels projects and some encouraging technical achievements, most proposals have become bogged down, and disheartened supporters are reluctant to proceed further until the economic, environmental, and political atmosphere clears up. The top-level study group urged a variety of federal financial incentives be provided to spur construction and operation of twelve to 15 synthetic fuel first-of-a-kind ''commercial demonstration'' projects. While hopefully contributing a daily 350,000 barrels of oil equivalent by the middle of the next decade, a prime justification for embarking on the commercialization program would be to provide specific environmental, economic,more » and technical information that is currently lacking. The task force specifically pushed for: loan guarantees of up to 75 percent of project cost for high-Btu pipeline gas from coal, loan guarantees for as much as 50 percent of project cost for shale oil, syncrude, and unregulated electric utility or industrial fuels along with price supports; construction grants of up to 50 percent of project costs for regulated utility and industrial fuels; and a maximum of 75 percent in loan guarantees for production of liquids and gases from biomass. Direct combustion of solid wastes for energy recovery was considered inappropriate for inclusion in the program. That particular industry was viewed by the task force as already on its way in response to urban needs. Industry and congressional responses to the incentives are reviewed. (MCW)« less
ERIC Educational Resources Information Center
Tyshkevich, N. I.
Emphasis is placed on the role of scientific and technical libraries in the education of Soviet workers. One of the main tasks of technical libraries is to educate workers to respect their professions, and to maintain communistic attitudes towards labor. Librarians acquaint younger workers with literature on the history of their plants with…
Nepal project moves ahead as grass-roots force.
1995-06-01
A JOICFP mission to Nepal (April 2-14, 1995) performed several tasks, including the following: 1) collection of materials from nongovernmental organizations, the government, and international agencies in preparation for a National IEC Workshop (November 14-16, 1995) and a National Workshop (November 19-21, 1995) on family planning promotions; 2) arrangements for an external evaluation of the Community-based Sustainable Family Planning/Maternal and Child Health (MCH) Project with Special Focus on Women, which is supported by the United Nations Population Fund (UNFPA); 3) discussions regarding the production of the Nepali version of the videotape, "Rakhee and Mousse," and plans for utilization of US$11,122 of the JOICFP Voluntary Fund (JVF); 4) observation of refresher training for 135 women volunteers from 15 villages in Panchkhal, Kavre District, that was conducted by Sabatri Basnet; and 5) a meeting with the village health committee and women volunteers of the community-based, primary health care unit of Anaikiot. Coordination with the other activities of the Family Planning Association of Nepal and women volunteers to diffuse FP/MCH services and project activities has been a positive development in the project. The mission decided, based on its visits, to formulate technical support in the form of training, provision of quality service, and a referral institute for patients for the project areas of Panchkhal and Sunsari.
LG-ANALYST: linguistic geometry for master air attack planning
NASA Astrophysics Data System (ADS)
Stilman, Boris; Yakhnis, Vladimir; Umanskiy, Oleg
2003-09-01
We investigate the technical feasibility of implementing LG-ANALYST, a new software tool based on the Linguistic Geometry (LG) approach. The tool will be capable of modeling and providing solutions to Air Force related battlefield problems and of conducting multiple experiments to verify the quality of the solutions it generates. LG-ANALYST will support generation of the Fast Master Air Attack Plan (MAAP) with subsequent conversion into Air Tasking Order (ATO). An Air Force mission is modeled employing abstract board games (ABG). Such a mission may include, for example, an aircraft strike package moving to a target area with the opposing side having ground-to-air missiles, anti-aircraft batteries, fighter wings, and radars. The corresponding abstract board captures 3D air space, terrain, the aircraft trajectories, positions of the batteries, strategic features of the terrain, such as bridges, and their status, radars and illuminated space, etc. Various animated views are provided by LG-ANALYST including a 3D view for realistic representation of the battlespace and a 2D view for ease of analysis and control. LG-ANALYST will allow a user to model full scale intelligent enemy, plan in advance, re-plan and control in real time Blue and Red forces by generating optimal (or near-optimal) strategies for all sides of a conflict.
Transportation and General Traffic Management, Change 2
NASA Technical Reports Server (NTRS)
1979-01-01
This Handbook sets forth those transportation and general traffic management responsibilities, guidelines, and procedures governing the use of commercial and Government transportation for NASA. Transportation is an integral function of the logistic process, involving all activities incident to the movement of persons and things. The fundamental and continuous objectives of transportation are to control and diminish the time-distance of lines of communication by the most suitable means. The function of transportation is accomplished through, and encompasses all, the planning, direction, supervision, and execution of the technical, operational, and administrative tasks required to procure or furnish efficient and economical conveyance of cargo and personnel by all modes of commercial and Government transportation. This Handbook is applicable to NASA Headquarters and Field Installations.
NASA Technical Reports Server (NTRS)
Csomor, A.; Nielson, C. E.
1989-01-01
This program will focus on the integration of all functional disciplines of the design, manufacturing, materials, fabrication and producibility to define and demonstrate a highly reliable, easily maintained, low cost liquid methane turbopump as a component for the STBE (Space Transportation Booster Engine) using the STME (main engine) oxygen turbopump. A cost model is to be developed to predict the recurring cost of production hardware and operations. A prime objective of the program is to design the liquid methane turbopump to be used in common with a LH2 turbopump optimized for the STME. Time phasing of the effort is presented and interrelationship of the tasks is defined. Major subcontractors are identified and their roles in the program are described.
Strategic and Unpressured Within-Task Planning and Their Associations with Working Memory
ERIC Educational Resources Information Center
Li, Shaofeng; Fu, Mengxia
2018-01-01
This study investigated the comparative effects of strategic and unpressured within-task planning on second language (L2) Chinese oral production and the role of working memory in mediating the effects of the two types of planning. Twenty-nine L2 Chinese learners at a large New Zealand university performed a narrative task after watching a…
NASA Technical Reports Server (NTRS)
Homem De Mello, Luiz S.; Sanderson, Arthur C.
1991-01-01
The authors introduce two criteria for the evaluation and selection of assembly plans. The first criterion is to maximize the number of different sequences in which the assembly tasks can be executed. The second criterion is to minimize the total assembly time through simultaneous execution of assembly tasks. An algorithm that performs a heuristic search for the best assembly plan over the AND/OR graph representation of assembly plans is discussed. Admissible heuristics for each of the two criteria introduced are presented. Some implementation issues that affect the computational efficiency are addressed.
Teaching Technical Writing: Focusing on Process.
ERIC Educational Resources Information Center
Santelmann, Patricia Kelly
In preparing students for business writing, a technical writing class should foster (1) a sensitivity to audience and an understanding of the business or technical organizational audience, (2) analytical problem solving that precedes any but the simplest writing task, (3) understanding of the patterns of organization that make information clear to…
Moving International Technical Communication Forward: A World Englishes Approach
ERIC Educational Resources Information Center
Bokor, Michael Jarvis Kwadzo
2011-01-01
This article explores how the English language contributes to cross-boundary communication failure and establishes that there is an "English language problem" that has not been adequately addressed in preparing United States native English-speaking students for international technical communication tasks. For example, U.S. technical communication…
ERIC Educational Resources Information Center
Kennedy, Patrick M.
2004-01-01
The main reason engineers, technicians, and programmers write poor technical documents is because they have had little training or experience in that area. This article addresses some of the basics that students can use to master technical writing tasks. The article covers the most common problems writers make and offers suggestions for improving…
A Taxonomy of Technical Assistance Skills.
ERIC Educational Resources Information Center
Ogden, Evelyn; Musumeci, Marilyn
To operationalize the Technical Assistance Brokerage System, the first major task called for the development of a taxonomy of training and technical assistance services specifying requisite skills and skill clusters by the dimensions of client type, stages of dissemination, and levels of experience. From a literature search approximately 400…
Looking Back, Moving Forward: Technical, Normative, and Political Dimensions of School Discipline
ERIC Educational Resources Information Center
Wiley, Kathryn E.; Anyon, Yolanda; Yang, Jessica L.; Pauline, Malina E.; Rosch, Alyssa; Valladares, Giovana; Downing, Barbara J.; Pisciotta, Lisa
2018-01-01
Purpose: School discipline reformers have presumed that such work is largely a technical task, emphasizing discrete changes to discipline policies and protocols. Yet prior theory and research suggest that emphasizing technical changes may overlook additional and important aspects of reform, namely, the normative and political dimensions within…
32 CFR 37.420 - Should I tell proposers that we will not disclose information that they submit?
Code of Federal Regulations, 2010 CFR
2010-07-01
... documents; and (ii) Business plans and technical information submitted on a confidential basis. (c) If proposers desire to protect business plans and technical information for five years from FOIA disclosure...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-21
...: These technical amendments are effective on March 21, 2012. FOR FURTHER INFORMATION CONTACT: Doris Lo, EPA Region IX, (415) 972- 3959, lo[email protected] . SUPPLEMENTARY INFORMATION: Technical Amendment for...
7 CFR 610.32 - Technical assistance furnished.
Code of Federal Regulations, 2013 CFR
2013-01-01
... Agriculture Regulations of the Department of Agriculture (Continued) NATURAL RESOURCES CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE CONSERVATION OPERATIONS TECHNICAL ASSISTANCE Conservation of Private Grazing Land... managers to plan and implement resource conservation on grazing land. The objective of planning on grazing...
7 CFR 610.32 - Technical assistance furnished.
Code of Federal Regulations, 2012 CFR
2012-01-01
... Agriculture Regulations of the Department of Agriculture (Continued) NATURAL RESOURCES CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE CONSERVATION OPERATIONS TECHNICAL ASSISTANCE Conservation of Private Grazing Land... managers to plan and implement resource conservation on grazing land. The objective of planning on grazing...
7 CFR 610.32 - Technical assistance furnished.
Code of Federal Regulations, 2014 CFR
2014-01-01
... Agriculture Regulations of the Department of Agriculture (Continued) NATURAL RESOURCES CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE CONSERVATION OPERATIONS TECHNICAL ASSISTANCE Conservation of Private Grazing Land... managers to plan and implement resource conservation on grazing land. The objective of planning on grazing...
7 CFR 610.32 - Technical assistance furnished.
Code of Federal Regulations, 2011 CFR
2011-01-01
... Agriculture Regulations of the Department of Agriculture (Continued) NATURAL RESOURCES CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE CONSERVATION OPERATIONS TECHNICAL ASSISTANCE Conservation of Private Grazing Land... managers to plan and implement resource conservation on grazing land. The objective of planning on grazing...
7 CFR 610.32 - Technical assistance furnished.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Agriculture Regulations of the Department of Agriculture (Continued) NATURAL RESOURCES CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE CONSERVATION OPERATIONS TECHNICAL ASSISTANCE Conservation of Private Grazing Land... managers to plan and implement resource conservation on grazing land. The objective of planning on grazing...
Effect of Pitch Size on Technical-Tactical Actions of the Goalkeeper in Small-Sided Games
Jara, Daniel; Ortega, Enrique; Gómez, Miguel-Ángel; de Baranda, Pilar Sainz
2018-01-01
Abstract The aim of this paper was to determine how the size of the pitch affected technical and tactical actions of the goalkeeper when playing small-sided games. The participants were 13 male youth players, including 3 goalkeepers. Three different pitch sizes were used (62 x 44 m; 50 x 35 m; 32 x 23 m). On each pitch, the players played three matches of 8 minutes, with 5-minute breaks between matches. Numerous variables were recorded and examined: defensive and offensive technical and tactical actions, opponent’s shooting zone, length and zone of the offensive action, and goal zone where the shoot was directed. An ad hoc observational tool was used. A descriptive analysis was described. The Fisher’s exact test was used when the expected distribution was below 5 or included values below 1%. Statistical significance was set at p < 0.05. The results showed that the technical-tactical actions of the goalkeeper differed among pitch sizes. In defensive actions, when the pitch was larger, the 1-on-1 situations took precedence, whereas when the pitch was smaller, the proportion of blocks increased. In offensive actions, the goalkeepers did not show a wide variety of actions when the pitch was larger, but when the pitch was smaller, passes with a hand or foot increased. These results show that the size should be taken into account when planning and designing tasks. PMID:29922387
DOE Office of Scientific and Technical Information (OSTI.GOV)
Korsah, Kofi; Muhlheim, Michael David; Wood, Richard
The US Nuclear Regulatory Commission (NRC) is initiating a new rulemaking project to develop a digital system common-cause failure (CCF) rule. This rulemaking will review and modify or affirm the NRC's current digital system CCF policy as discussed in the Staff Requirements Memorandum to the Secretary of the Commission, Office of the NRC (SECY) 93-087, Policy, Technical, and Licensing Issues Pertaining to Evolutionary and Advanced Light Water Reactor (ALWR) Designs, and Branch Technical Position (BTP) 7-19, Guidance on Evaluation of Defense-in-Depth and Diversity in Digital Computer-Based Instrumentation and Control Systems, as well as Chapter 7, Instrumentation and Controls, in NRCmore » Regulatory Guide (NUREG)-0800, Standard Review Plan for Review of Safety Analysis Reports for Nuclear Power Plants (ML033580677). The Oak Ridge National Laboratory (ORNL) is providing technical support to the NRC staff on the CCF rulemaking, and this report is one of several providing the technical basis to inform NRC staff members. For the task described in this report, ORNL examined instrumentation and controls (I&C) technology implementations in nuclear power plants in the light of current CCF guidance. The intent was to assess whether the current position on CCF is adequate given the evolutions in digital safety system implementations and, if gaps in the guidance were found, to provide recommendations as to how these gaps could be closed.« less
Suborbital Safety Technical Committee- Summary of Proposed Standards & Guidelines
NASA Astrophysics Data System (ADS)
Quinn, Andy; Atencia Yepez, Amaya; Klicker, Michael; Howard, Diane; Verstraeten, Joram; Other Suborbital Safety TC Members
2013-09-01
There are currently no international safety standards and guidelines to assist designers, operators and authorities in the suborbital domain. There is a launch licensing regime in the United States (US) to assist the forerunners of the suborbital domain however this does not provide a safety approval for the vehicle against set standards or does not have an acceptable level of safety to achieve in terms of design or operation. In Europe a certification framework may be implemented however this (or any regulatory framework) is not in place as yet. This paper summarises the 5 tasks thus far completed by the International Association for the Advancement of Space Safety (IAASS) Suborbital Safety Technical Committee (SS TC) in terms of deriving standards and guidelines for the suborbital domain. The SS TC comprises members from the suborbital industry (US and European vehicle designers), safety experts, legal experts, medical/training experts, prospective spaceport operators and members from the US and European authorities (though these members cannot directly steer the standards and guidelines - they can merely review them for interest and comment on non-policy aspects). The SS TC has been divided into three working groups (WG): Regulatory WG, Technical WG and Operations WG. The 5 tasks that are summarised in this paper include: Regulatory WG - (Task 1) Clarify and promote regulatory framework for suborbital flights (including discussions on Space Law 'v' Air Law for suborbital domain); Technical WG - (Task 1) Defining & Alignment (globally) of Safety Criteria for Suborbital domain using industry best practices, (Task 2) Software/complex hardware certification for suborbital flights; Operations WG - (Task 1) Flight Crew and Spaceflight Participant Medical and Training Standards & Guidelines for suborbital flight, (Task 2) Spaceport Safety Management System. This paper also details the next set of standards and guidelines that will be derived by the SS TC. The paper concludes that these and future IAASS suborbital safety standards and guidelines are needed now and should beconsidered by the industry players before the first commercial flights expected late 2013/early 2014.
Efficiency in Rule- vs. Plan-Based Movements Is Modulated by Action-Mode.
Scheib, Jean P P; Stoll, Sarah; Thürmer, J Lukas; Randerath, Jennifer
2018-01-01
The rule/plan motor cognition (RPMC) paradigm elicits visually indistinguishable motor outputs, resulting from either plan- or rule-based action-selection, using a combination of essentially interchangeable stimuli. Previous implementations of the RPMC paradigm have used pantomimed movements to compare plan- vs. rule-based action-selection. In the present work we attempt to determine the generalizability of previous RPMC findings to real object interaction by use of a grasp-to-rotate task. In the plan task, participants had to use prospective planning to achieve a comfortable post-handle rotation hand posture. The rule task used implementation intentions (if-then rules) leading to the same comfortable end-state. In Experiment A, we compare RPMC performance of 16 healthy participants in pantomime and real object conditions of the experiment, within-subjects. Higher processing efficiency of rule- vs. plan-based action-selection was supported by diffusion model analysis. Results show a significant response-time increase in the pantomime condition compared to the real object condition and a greater response-time advantage of rule-based vs. plan-based actions in the pantomime compared to the real object condition. In Experiment B, 24 healthy participants performed the real object RPMC task in a task switching vs. a blocked condition. Results indicate that plan-based action-selection leads to longer response-times and less efficient information processing than rule-based action-selection in line with previous RPMC findings derived from the pantomime action-mode. Particularly in the task switching mode, responses were faster in the rule compared to the plan task suggesting a modulating influence of cognitive load. Overall, results suggest an advantage of rule-based action-selection over plan-based action-selection; whereby differential mechanisms appear to be involved depending on the action-mode. We propose that cognitive load is a factor that modulates the advantageous effect of implementation intentions in motor cognition on different levels as illustrated by the varying speed advantages and the variation in diffusion parameters per action-mode or condition, respectively.
Geotechnical support and topical studies for nuclear waste geologic repositories
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1989-01-01
The present report lists the technical reviews and comments made during the fiscal year 1988 and summarizes the technical progress of the topical studies. In the area of technical assistance, there were numerous activities detailed in the next section. These included 24 geotechnical support activities, including reviews of 6 Study Plans (SP) and participation in 6 SP Review Workshops, review of one whole document Site Characterization Plan (SCP) and participation in the Assembled Document SCP Review Workshops by 6 LBL reviewers; the hosting of a DOE program review, the rewriting of the project statement of work, 2 trips to technicalmore » and planning meetings; preparation of proposed work statements for two new topics for DOE, and 5 instances of technical assistance to DOE. These activities are described in a Table in the following section entitled Geoscience Technical Support for Nuclear Waste Geologic Repositories.''« less
Application of dexterous space robotics technology to myoelectric prostheses
NASA Astrophysics Data System (ADS)
Hess, Clifford; Li, Larry C. H.; Farry, Kristin A.; Walker, Ian D.
1994-02-01
Future space missions will require robots equipped with highly dexterous robotic hands to perform a variety of tasks. A major technical challenge in making this possible is an improvement in the way these dexterous robotic hands are remotely controlled or teleoperated. NASA is currently investigating the feasibility of using myoelectric signals to teleoperate a dexterous robotic hand. In theory, myoelectric control of robotic hands will require little or no mechanical parts and will greatly reduce the bulk and weight usually found in dexterous robotic hand control devices. An improvement in myoelectric control of multifinger hands will also benefit prosthetics users. Therefore, as an effort to transfer dexterous space robotics technology to prosthetics applications and to benefit from existing myoelectric technology, NASA is collaborating with the Limbs of Love Foundation, the Institute for Rehabilitation and Research, and Rice University in developing improved myoelectric control multifinger hands and prostheses. In this paper, we will address the objectives and approaches of this collaborative effort and discuss the technical issues associated with myoelectric control of multifinger hands. We will also report our current progress and discuss plans for future work.
Application of dexterous space robotics technology to myoelectric prostheses
NASA Technical Reports Server (NTRS)
Hess, Clifford; Li, Larry C. H.; Farry, Kristin A.; Walker, Ian D.
1994-01-01
Future space missions will require robots equipped with highly dexterous robotic hands to perform a variety of tasks. A major technical challenge in making this possible is an improvement in the way these dexterous robotic hands are remotely controlled or teleoperated. NASA is currently investigating the feasibility of using myoelectric signals to teleoperate a dexterous robotic hand. In theory, myoelectric control of robotic hands will require little or no mechanical parts and will greatly reduce the bulk and weight usually found in dexterous robotic hand control devices. An improvement in myoelectric control of multifinger hands will also benefit prosthetics users. Therefore, as an effort to transfer dexterous space robotics technology to prosthetics applications and to benefit from existing myoelectric technology, NASA is collaborating with the Limbs of Love Foundation, the Institute for Rehabilitation and Research, and Rice University in developing improved myoelectric control multifinger hands and prostheses. In this paper, we will address the objectives and approaches of this collaborative effort and discuss the technical issues associated with myoelectric control of multifinger hands. We will also report our current progress and discuss plans for future work.
Brunelle, Jean-François; Blais-Coutu, Sébastien; Gouadec, Kenan; Bédard, Éric; Fait, Philippe
2015-01-01
Introduction In preparation for a short track speed skating season, eight men and seven women were given yoga sessions during an 8-week high volume training cycle. The sessions were planned according to the postural aspects specific to short track speed skating technical requirements. Three specific goals were selected for the intervention: 1) to observe whether the practice of yoga as postural training could improve the efficiency and the athlete’s repertoire along the muscular synergies solicited in the short track speed skating specific technique; 2) to enhance and diversify the motor time-on-task of athletes without changing the prescription of other training stimulus; and 3) to lower the risk of injury during periods with high volumes of training. Methods A total of 36 sessions of yoga were given. Three postural tests were administered before and after the intervention with 14 angles analyzed. Non-parametric Wilcoxon test was used to compare angles’ variations. Results The 36 yoga sessions totalized 986 minutes of motor time-on-task, registering a proportion of 30% of the global motor time-on-task of the training cycle. Improvements were found in eleven of the 14 angles measured when comparing pre- and post-postural tests (P-value from 0.01 to 0.005). During the 8 weeks, excepting traumatic injuries due to short track speed skating accidents, no skaters suffered injuries linked to the high volume of training. Following the intervention, coaches noticed, following their on-ice feedbacks, an adjustment in the efficiency of the skating technique, in particular regarding hip dissociation. Conclusion These results suggest that yoga could be inserted into out-of-season training cycles, even in a high volume training cycle. Planned with the decision training tools, it allows athletes to diversify their motor time-on-task by integrating a new functional range of generic movements with the solicitation of neuromuscular synergies related to the specificity of their sport. PMID:25709511
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-15
... Care and Network-Based Private Fee-for-Service Plans Under Part C (Sec. 422.112) 7. Deemable Program... Cost by HMO/CMP Cost Contractors and Health Care Prepayment Plans (HCPPs) (Sec. 417.564) 4. Calculation... and Other Technical Changes 1. Application of Subpart M to Health Care Prepayment Plans (Sec. 417.840...
ERIC Educational Resources Information Center
Stoehr, Keith W.; Covelli, Nicholas J.
This report presents Gateway Technical Institute's long-range plan for 1982-1987. After prefatory material discussing financial and non-financial factors that may impinge on the plan, Chapter I outlines the socioeconomic situation in the three-county area of Wisconsin served by the college and introduces some of the critical issues that the…
ERIC Educational Resources Information Center
Meissner, Judith A.; And Others
The ETS Matched Pictures test was used in the longitudinal study to measure children's comprehension of certain grammatical features, such as past and future tenses, negation and prepositions. The task materials for both I and II consist of a set of cards, with each card having a pair of black and white pictures. Both pictures in a pair contain…
Task-level control for autonomous robots
NASA Technical Reports Server (NTRS)
Simmons, Reid
1994-01-01
Task-level control refers to the integration and coordination of planning, perception, and real-time control to achieve given high-level goals. Autonomous mobile robots need task-level control to effectively achieve complex tasks in uncertain, dynamic environments. This paper describes the Task Control Architecture (TCA), an implemented system that provides commonly needed constructs for task-level control. Facilities provided by TCA include distributed communication, task decomposition and sequencing, resource management, monitoring and exception handling. TCA supports a design methodology in which robot systems are developed incrementally, starting first with deliberative plans that work in nominal situations, and then layering them with reactive behaviors that monitor plan execution and handle exceptions. To further support this approach, design and analysis tools are under development to provide ways of graphically viewing the system and validating its behavior.
Verification of accurate technical insight: a prerequisite for self-directed surgical training.
Hu, Yinin; Kim, Helen; Mahmutovic, Adela; Choi, Joanna; Le, Ivy; Rasmussen, Sara
2015-03-01
Simulation-based surgical skills training during preclinical education is a persistent challenge due to time constraints of trainees and instructors alike. Self-directed practice is resource-efficient and flexible; however, insight into technical proficiency among trainees is often lacking. The purpose of this study is to prospectively assess the accuracy of self-assessments among medical students learning basic surgical suturing. Over seven weekly practice sessions, preclinical medical students performed serial repetitions of a simulation-based suturing task under one-on-one observation by one of four trainers. Following each task repetition, self- and trainer-assessments (SA-TA) were performed using a 36-point weighted checklist of technical standards developed a priori by expert consensus. Upon study completion, agreement between SA and TA was measured using weighted Cohen's kappa coefficients. Twenty-nine medical students each performed a median of 25 suture task repetitions (IQR 21.5-28). Self-assessments tended to overestimate proficiency during the first tertile of practice attempts. Agreement between SA and TA improved with experience, such that the weighted kappa statistics for the two-handed and instrument ties were >0.81 after 18-21 task attempts. Inexperienced trainees frequently overestimate technical proficiency through self-assessments. However, this bias diminishes with repetitive practice. Only after trainees have attained the capacity to accurately self-assess can effective self-directed learning take place.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wall, Anna
With recent trends toward intermittent renewable energy sources in the U.S., the geothermal industry in its current form faces a crossroad: adapt, disrupt, or be left behind. Strategic planning with scenario analysis offers a framework to characterize plausible views of the future given current trends - as well as disruptions to the status quo. To inform strategic planning in the Department of Energy's (DOE) Geothermal Technology Office (GTO), the Geothermal Vision Study is tasked with offering data-driven pathways for future geothermal development. Scenario analysis is a commonly used tool in private industry corporate strategic planning as a way to prioritizemore » and manage large investments in light of uncertainty and risk. Since much of the uncertainty and risk in a geothermal project is believed to occur within early stage exploration and drilling, this paper focuses on the levers (technical and financial) within the exploration process that can be pulled to affect change. Given these potential changes, this work first qualitatively explores potential shifts to the geothermal industry. Future work within the Geothermal Vision Study will incorporate these qualitative scenarios quantitatively, in competition with other renewable and conventional energy industries.« less
Risk Perception Analysis Related To Existing Dams In Italy
NASA Astrophysics Data System (ADS)
Solimene, Pellegrino
2013-04-01
In the first part of this work, the progress of Italian National Rules about dams design, construction and operation are presented to highlight the strong connection existing between the promulgation of new decrees, as a consequence of a dam accidents, and the necessity to prevent further loss of lives and goods downstream. Following the Gleno Dam failure (1923), a special Ministerial Committee wrote out the first Regulations and made the proposal to establish, within the High Council of Public Works, a special department that become soon the "Dam Service", with the tasks of control and supervision about construction and operation phases of the dams and their reservoirs. A different definition of tasks and the structure of Dam Service were provided in accordance with law n° 183/1989, which transferred all the technical services to the Office of the Prime Minister; the aim was to join the Dam Office with the Department for National Technical Services, with the objective of increasing the knowledge of the territory and promoting the study on flood propagation downstream in case of operations on bottom outlet or hypothetical dam-break. In fact, population living downstream is not ready to accept any amount of risk because has not a good knowledge of the efforts of experts involved in dam safety, both from the operators and from the safety Authority. So it's important to optimize all the activities usually performed in a dam safety program and improve the emergency planning as a response to people's primary needs and feeling about safety from Civil Protection Authority. In the second part of the work, a definition of risk is provided as the relationship existing between probability of occurrence and loss, setting out the range within to plan for prevention (risk mitigation), thanks to the qualitative assessment of the minimum safety level that is suited to assign funds to plan for Civil Protection (loss mitigation). The basic meaning of the reliability of a zoned earthfill dam is illustrated by defining the risk analysis during its construction and operation. A qualitative "Event Tree Analysis" makes clear with an example the probability of occurrence of the events triggered by an earthquake, and leads to a classification of the damage level. Finally, a System Dynamics (SD) approach is presented to investigate possibilities of a preventive planning in relationship to the risk, so that it's possible to establish shared procedures to achieve the correct management in any crisis phase. As a qualitative result of a SD application, figure 1 presents a flow-chart about a case study on the same dam so to illustrate the emergency planning in a step by step procedure according to the Regulations.
Technical Assistance to Developers
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rockward, Tommy; Borup, Rodney L.; Garzon, Fernando H.
2012-07-17
This task supports the allowance of technical assistance to fuel-cell component and system developers as directed by the DOE. This task includes testing of novel materials and participation in the further development and validation of single cell test protocols. This task also covers technical assistance to DOE Working Groups, the U.S. Council for Automotive Research (USCAR) and the USCAR/DOE Driving Research and Innovation for Vehicle efficiency and Energy sustainability (U.S. Drive) Fuel Cell Technology Team. Assistance includes technical validation of new fuel cell materials and methods, single cell fuel cell testing to support the development of targets and test protocols,more » and regular advisory participation in other working groups and reviews. This assistance is made available to PEM fuel cell developers by request and DOE Approval. The objectives are to: (1) Support technically, as directed by DOE, fuel cell component and system developers; (2) Assess fuel cell materials and components and give feedback to developers; (3) Assist the DOE Durability Working Group with the development of various new material durability Testing protocols; and (4) Provide support to the U.S. Council for Automotive Research (USCAR) and the USCAR/DOE Fuel Cell Technology Team. FY2012 specific technical objectives are: (1) Evaluate novel MPL materials; (2) Develop of startup/ shutdown protocol; (3) Test the impact of hydrophobic treatment on graphite bi-polar plates; (4) Perform complete diagnostics on metal bi-polar plates for corrosion; and (5) Participate and lead efforts in the DOE Working Groups.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Holt, V.L.; Burgoa, B.B.
1993-12-01
This document is a site-specific work plan/health and safety checklist (WP/HSC) for a task of the Waste Area Grouping 2 Remedial Investigation and Site Investigation (WAG 2 RI&SI). Title 29 CFR Part 1910.120 requires that a health and safety program plan that includes site- and task-specific information be completed to ensure conformance with health- and safety-related requirements. To meet this requirement, the health and safety program plan for each WAG 2 RI&SI field task must include (1) the general health and safety program plan for all WAG 2 RI&SI field activities and (2) a WP/HSC for that particular field task.more » These two components, along with all applicable referenced procedures, must be kept together at the work site and distributed to field personnel as required. The general health and safety program plan is the Health and Safety Plan for the Remedial Investigation and Site Investigation of Waste Area Grouping 2 at the Oak Ridge National Laboratory, Oak Ridge, Tennessee (ORNL/ER-169). The WP/HSCs are being issued as supplements to ORNL/ER-169.« less
7 CFR 1709.117 - Application requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... project including target community, goals, tasks to be completed and other relevant information that... to support a finding of technical feasibility; (ii) Identify the major tasks to be performed and a proposed timeline for completion of each task; and (iii) Identify the location of the project target area...
Determining robot actions for tasks requiring sensor interaction
NASA Technical Reports Server (NTRS)
Budenske, John; Gini, Maria
1989-01-01
The performance of non-trivial tasks by a mobile robot has been a long term objective of robotic research. One of the major stumbling blocks to this goal is the conversion of the high-level planning goals and commands into the actuator and sensor processing controls. In order for a mobile robot to accomplish a non-trivial task, the task must be described in terms of primitive actions of the robot's actuators. Most non-trivial tasks require the robot to interact with its environment; thus necessitating coordination of sensor processing and actuator control to accomplish the task. The main contention is that the transformation from the high level description of the task to the primitive actions should be performed primarily at execution time, when knowledge about the environment can be obtained through sensors. It is proposed to produce the detailed plan of primitive actions by using a collection of low-level planning components that contain domain specific knowledge and knowledge about the available sensors, actuators, and sensor/actuator processing. This collection will perform signal and control processing as well as serve as a control interface between an actual mobile robot and a high-level planning system. Previous research has shown the usefulness of high-level planning systems to plan the coordination of activities such to achieve a goal, but none have been fully applied to actual mobile robots due to the complexity of interacting with sensors and actuators. This control interface is currently being implemented on a LABMATE mobile robot connected to a SUN workstation and will be developed such to enable the LABMATE to perform non-trivial, sensor-intensive tasks as specified by a planning system.
Housing, health and master planning: rules of engagement.
Harris, P; Haigh, F; Thornell, M; Molloy, L; Sainsbury, P
2014-04-01
Knowledge about health focussed policy collaboration to date has been either tactical or technical. This article focusses on both technical and tactical issues to describe the experience of cross-sectoral collaboration between health and housing stakeholders across the life of a housing master plan, including but not limited to a health impact assessment (HIA). A single explanatory case study of collaboration on a master plan to regenerate a deprived housing estate in Western Sydney was developed to explain why and how the collaboration worked or did not work. Data collection included stakeholder interviews, document review, and reflections by the health team. Following a realist approach, data was analysed against established public policy theory dimensions. Tactically we did not know what we were doing. Despite our technical knowledge and skills with health focussed processes, particularly HIA, we failed to appreciate complexities inherent in master planning. This limited our ability to provide information at the right points. Eventually however the HIA did provide substantive connections between the master plan and health. We use our analysis to develop technical and tactical rules of engagement for future cross-sectoral collaboration. This case study from the field provides insight for future health focussed policy collaboration. We demonstrate the technical and tactical requirements for future intersectoral policy and planning collaborations, including HIAs, with the housing sector on master planning. The experience also suggested how HIAs can be conducted flexibly alongside policy development rather than at a specific point after a policy is drafted. Copyright © 2014 The Royal Society for Public Health. All rights reserved.
10 CFR 603.420 - Disclosure of information.
Code of Federal Regulations, 2010 CFR
2010-01-01
... types that are exempt: (i) Proposals, proposal abstracts, and supporting documents; and (ii) Business plans and technical information submitted on a confidential basis. (c) If proposers desire to protect business plans and technical information for five years from FOIA disclosure requirements, they must mark...
DOT National Transportation Integrated Search
2017-11-01
This report is one of two NCST Research Report documents produced as part of a project to advance the technical modeling tools for resiliency and adaptation planning, especially those used for criticality rankings. The official final technical report...
Code of Federal Regulations, 2011 CFR
2011-04-01
... Financial Assistance for Planning and Negotiation Grants for Non-BIA Programs Eligibility and Application Process § 1000.68 May non-BIA bureaus provide technical assistance to a Tribe/Consortium in drafting its...
Code of Federal Regulations, 2012 CFR
2012-04-01
... Financial Assistance for Planning and Negotiation Grants for Non-BIA Programs Eligibility and Application Process § 1000.68 May non-BIA bureaus provide technical assistance to a Tribe/Consortium in drafting its...
Code of Federal Regulations, 2014 CFR
2014-04-01
... Financial Assistance for Planning and Negotiation Grants for Non-BIA Programs Eligibility and Application Process § 1000.68 May non-BIA bureaus provide technical assistance to a Tribe/Consortium in drafting its...
Code of Federal Regulations, 2013 CFR
2013-04-01
... Financial Assistance for Planning and Negotiation Grants for Non-BIA Programs Eligibility and Application Process § 1000.68 May non-BIA bureaus provide technical assistance to a Tribe/Consortium in drafting its...
DOT National Transportation Integrated Search
2012-08-01
This report presents the test plan for conducting the Technical Capability Analysis for the United States Department of Transportation (U.S. DOT) evaluation of the Dallas U.S. 75 Integrated Corridor Management (ICM) Initiative Demonstration. The ICM ...
Familiarity and Personal Experience as Mediators of Recall when Planning for Future Contingencies
ERIC Educational Resources Information Center
Klein, Stanley B.; Robertson, Theresa E.; Delton, Andrew W.; Lax, Moshe L.
2012-01-01
In this article, we demonstrate that planning tasks enhance recall when the context of planning (a) is self-referential and (b) draws on familiar scenarios represented in episodic memory. Specifically, we show that when planning tasks are sorted according to the degree to which they evoke memories of personally familiar scenarios (e.g., planning a…
How to develop and write a case for technical writing
NASA Technical Reports Server (NTRS)
Couture, B.; Goldstein, J.
1981-01-01
Case of different sizes and shapes for teaching technical writing to engineers at Wayne State University have been developed. The case approach was adopted for some assignments because sophomores and juniors lacked technical expertise and professional knowledge of the engineering world. Cases were found to be good exercises, providing realistic practice in specific writing tasks or isolating particular skills in the composing process. A special kind of case which narrates the experiences of one technical person engaged in the problem-solving process in a professional rhetorical situation was developed. This type of long, realistic fiction is called a an "holistic" case. Rather than asking students to role-play a character, an holistic case realistically encompasses the whole of the technical writing process. It allows students to experience the total communication act in which the technical task and data are fully integrated into the rhetorical situation and gives an opportunity to perform in a realistic context, using skills and knowledge required in communication on the job. It is believed that the holistic case most fully exploits the advantages of the case method for students of professional communication.
Space station human productivity study. Volume 5: Management plans
NASA Technical Reports Server (NTRS)
1985-01-01
The 67 Management Plans represent recommended study approaches for resolving 108 of the 305 Issues which were identified. Each study Management Plan is prepared in three formats: Management Plan Overview (lists the subsumed Issues, study background, and related overview information); Study Plan (details the study approach by tasks, lists special needs, and describes expected study products); Schedule-Task Flow (provides a time-lined schedule for the study tasks and resource requirements). The Management Relationships Matrix, included in this volume, shows the data input-output relationships among all recommended studies. A listing is also included which cross-references the unresolved requirements to Issues to management plans. A glossary of all abbreviations utilized is provided.
SOLID STATE ENERGY CONVERSION ALLIANCE DELPHI SOLID OXIDE FUEL CELL
DOE Office of Scientific and Technical Information (OSTI.GOV)
Steven Shaffer; Sean Kelly; Subhasish Mukerjee
2003-12-08
The objective of Phase I under this project is to develop a 5 kW Solid Oxide Fuel Cell power system for a range of fuels and applications. During Phase I, the following will be accomplished: Develop and demonstrate technology transfer efforts on a 5 kW stationary distributed power generation system that incorporates steam reforming of natural gas with the option of piped-in water (Demonstration System A). Initiate development of a 5 kW system for later mass-market automotive auxiliary power unit application, which will incorporate Catalytic Partial Oxidation (CPO) reforming of gasoline, with anode exhaust gas injected into an ultra-lean burnmore » internal combustion engine. This technical progress report covers work performed by Delphi from January 1, 2003 to June 30, 2003, under Department of Energy Cooperative Agreement DE-FC-02NT41246. This report highlights technical results of the work performed under the following tasks: Task 1 System Design and Integration; Task 2 Solid Oxide Fuel Cell Stack Developments; Task 3 Reformer Developments; Task 4 Development of Balance of Plant (BOP) Components; Task 5 Manufacturing Development (Privately Funded); Task 6 System Fabrication; Task 7 System Testing; Task 8 Program Management; and Task 9 Stack Testing with Coal-Based Reformate.« less
Annual Report of the Metals and Ceramics Information Center, 1 May 1979-30 April 1980.
1980-07-01
MANAGEMENT AND ECONOMIC ANALYSIS DEPT. * Computer and Information SyslemsiD. C Operations 1 Battelle Technical Inputs to Planning * Computer Systems 0...Biomass Resources * Education 0 Business Planning * Information Systems * Economics , Planning and Policy Analysis * Statistical and Mathematical Modelrng...Metals and Ceramics Information Center (MCIC) is one of several technical information analysis centers (IAC’s) chartered and sponsored by the
Career Opportunities in Texas: A Master Plan for Vocational and Technical Education (1989 Update).
ERIC Educational Resources Information Center
Texas State Board of Education, Austin.
In January 1987, a Master Plan for the delivery of vocational and technical education in Texas was adopted by the State Board of Education (SBOE). The master plan details goals and strategies to assist in the development of a skilled and educated work force in Texas as the state enters the 21st century. As part of their mandated annual review…
On December 9, 2013, EPA reconvened the study’s Technical Roundtable. Subject-matter experts discussed the outcomes of the 2013 Technical Workshops, stakeholder engagement, and plans for draft assessment report.
Mutemwa, Richard; Mayhew, Susannah H; Warren, Charlotte E; Abuya, Timothy; Ndwiga, Charity; Kivunaga, Jackline
2017-01-01
Abstract The aim of this study was to investigate association between HIV and family planning integration and technical quality of care. The study focused on technical quality of client–provider consultation sessions. The cross-sectional study observed 366 client–provider consultation sessions and interviewed 37 health care providers in 12 public health facilities in Kenya. Multilevel random intercept and linear regression models were fitted to the matched data to investigate relationships between service integration and technical quality of care as well as associations between facility-level structural and provider factors and technical quality of care. A sensitivity analysis was performed to test for hidden bias. After adjusting for facility-level structural factors, HIV/family planning integration was found to have significant positive effect on technical quality of the consultation session, with average treatment effect 0.44 (95% CI: 0.63–0.82). Three of the 12 structural factors were significantly positively associated with technical quality of consultation session including: availability of family planning commodities (9.64; 95% CI: 5.07–14.21), adequate infrastructure (5.29; 95% CI: 2.89–7.69) and reagents (1.48; 95% CI: 1.02–1.93). Three of the nine provider factors were significantly positively associated with technical quality of consultation session: appropriate provider clinical knowledge (3.14; 95% CI: 1.92–4.36), job satisfaction (2.02; 95% CI: 1.21–2.83) and supervision (1.01; 95% CI: 0.35–1.68), while workload (−0.88; 95% CI: −1.75 to − 0.01) was negatively associated. Technical quality of the client–provider consultation session was also determined by duration of the consultation and type of clinic visit and appeared to depend on whether the clinic visit occurred early or later in the week. Integration of HIV care into family planning services can improve the technical quality of client–provider consultation sessions as measured by both health facility structural and provider factors. PMID:29194543
Mutemwa, Richard; Mayhew, Susannah H; Warren, Charlotte E; Abuya, Timothy; Ndwiga, Charity; Kivunaga, Jackline
2017-11-01
The aim of this study was to investigate association between HIV and family planning integration and technical quality of care. The study focused on technical quality of client-provider consultation sessions. The cross-sectional study observed 366 client-provider consultation sessions and interviewed 37 health care providers in 12 public health facilities in Kenya. Multilevel random intercept and linear regression models were fitted to the matched data to investigate relationships between service integration and technical quality of care as well as associations between facility-level structural and provider factors and technical quality of care. A sensitivity analysis was performed to test for hidden bias. After adjusting for facility-level structural factors, HIV/family planning integration was found to have significant positive effect on technical quality of the consultation session, with average treatment effect 0.44 (95% CI: 0.63-0.82). Three of the 12 structural factors were significantly positively associated with technical quality of consultation session including: availability of family planning commodities (9.64; 95% CI: 5.07-14.21), adequate infrastructure (5.29; 95% CI: 2.89-7.69) and reagents (1.48; 95% CI: 1.02-1.93). Three of the nine provider factors were significantly positively associated with technical quality of consultation session: appropriate provider clinical knowledge (3.14; 95% CI: 1.92-4.36), job satisfaction (2.02; 95% CI: 1.21-2.83) and supervision (1.01; 95% CI: 0.35-1.68), while workload (-0.88; 95% CI: -1.75 to - 0.01) was negatively associated. Technical quality of the client-provider consultation session was also determined by duration of the consultation and type of clinic visit and appeared to depend on whether the clinic visit occurred early or later in the week. Integration of HIV care into family planning services can improve the technical quality of client-provider consultation sessions as measured by both health facility structural and provider factors. © The Author 2017. Published by Oxford University Press in association with The London School of Hygiene and Tropical Medicine.
Discharge Planning Revisited: What Do Social Workers Actually Do in Discharge Planning?
ERIC Educational Resources Information Center
Kadushin, Goldie; Kulys, Regina
1993-01-01
Interviewed 80 social workers in 36 acute care hospitals concerning amount of time they spent on and importance of 73 discharge planning tasks. Findings suggest that discharge planning comprises primarily concrete resource provision with counseling component focused on decision making. Time spent on tasks was influenced by prospective payment…
A Test of Motor (Not Executive) Planning in Developmental Coordination Disorder and Autism
ERIC Educational Resources Information Center
van Swieten, Lisa M.; van Bergen, Elsje; Williams, Justin H. G.; Wilson, Andrew D.; Plumb, Mandy S.; Kent, Samuel W.; Mon-Williams, Mark A.
2010-01-01
Grip selection tasks have been used to test "planning" in both autism and developmental coordination disorder (DCD). We differentiate between "motor" and "executive" planning and present a modified motor planning task. Participants grasped a cylinder in 1 of 2 orientations before turning it clockwise or anticlockwise.…
Still Not Enough Time in the Day: Media Specialists, Program Planning and Time Management, Part II
ERIC Educational Resources Information Center
Fitzgerald, Mary Ann; Waldrip, Andrea
2004-01-01
The ways in which one can keep the library media plan on track in the face of the realistic challenges faced by media are discussed. A system for prioritizing tasks, both planned goal-related tasks and tasks that walk in the door in varying degrees of emergency status and by need of more time management strategies could be used. [For Part I, see…
ERIC Educational Resources Information Center
Ahmadian, Mohammad Javad; Tavakoli, Mansoor
2011-01-01
This article reports on a study that was primarily aimed at investigating the effects of simultaneous use of careful online planning and task repetition on accuracy, complexity, and fluency in the oral production of learners of English as a foreign language (EFL). The effects of four planning and task repetition conditions (i.e. careful online…
Planning Abilities in Bilingual and Monolingual Children: Role of Verbal Mediation.
Gangopadhyay, Ishanti; McDonald, Margarethe; Ellis Weismer, Susan; Kaushanskaya, Margarita
2018-01-01
We examined the role of verbal mediation in planning performance of English-Spanish-speaking bilingual children and monolingual English-speaking children, between the ages of 9 and 12 years. To measure planning, children were administered the Tower of London (ToL) task. In a dual-task paradigm, children completed ToL problems under three conditions: with no secondary task (baseline), with articulatory suppression, and with non-verbal motor suppression. Analyses revealed generally shorter planning times for bilinguals than monolinguals but both groups performed similarly on number of moves and execution times. Additionally, bilingual children were more efficient at planning throughout the duration of the task while monolingual children showed significant gains with more practice. Children's planning times under articulatory suppression were significantly shorter than under motor suppression as well as the baseline condition, and there was no difference in planning times between monolingual and bilingual children during articulatory suppression. These results demonstrate that bilingualism influences performance on a complex EF measure like planning, and that these effects are not related to verbal mediation.
Planning Abilities in Bilingual and Monolingual Children: Role of Verbal Mediation
Gangopadhyay, Ishanti; McDonald, Margarethe; Ellis Weismer, Susan; Kaushanskaya, Margarita
2018-01-01
We examined the role of verbal mediation in planning performance of English–Spanish-speaking bilingual children and monolingual English-speaking children, between the ages of 9 and 12 years. To measure planning, children were administered the Tower of London (ToL) task. In a dual-task paradigm, children completed ToL problems under three conditions: with no secondary task (baseline), with articulatory suppression, and with non-verbal motor suppression. Analyses revealed generally shorter planning times for bilinguals than monolinguals but both groups performed similarly on number of moves and execution times. Additionally, bilingual children were more efficient at planning throughout the duration of the task while monolingual children showed significant gains with more practice. Children’s planning times under articulatory suppression were significantly shorter than under motor suppression as well as the baseline condition, and there was no difference in planning times between monolingual and bilingual children during articulatory suppression. These results demonstrate that bilingualism influences performance on a complex EF measure like planning, and that these effects are not related to verbal mediation. PMID:29593620
Low Impact Development Master Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Loftin, Samuel R.
This project creates a Low Impact Development (LID) Master Plan to guide and prioritize future development of LID projects at Los Alamos National Laboratory (LANL or the Laboratory). The LID Master Plan applies to developed areas across the Laboratory and focuses on identifying opportunities for storm water quality and hydrological improvements in the heavily urbanized areas of Technical Areas 03, 35 and 53. The LID Master Plan is organized to allow the addition of LID projects for other technical areas as time and funds allow in the future.
NASA Technical Reports Server (NTRS)
Wynne, Eleanor C.
1994-01-01
The purpose is to present the Structural Dynamics Division's research accomplishments for F.Y. 1993 and research plans for F.Y. 1994. The work under each Branch (technical area) is described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to 5-year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.
NASA Technical Reports Server (NTRS)
Smith, Jacqueline G.; Gardner, James E.
1990-01-01
The purpose is to present the Structural Dynamics Division's research accomplishments for FY 1989 and research plans for FY 1990. The work under each Branch (technical area) is described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to five year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.
NASA Technical Reports Server (NTRS)
Gardner, J. E.; Dixon, S. C.
1986-01-01
The Langley Research Center Loads and Aeroelasticity Division's research accomplishments for FY85 and research plans for FY86 are presented. The rk under each branch (technical area) will be described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to five year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.
NASA Technical Reports Server (NTRS)
Gardner, James E.; Dixon, S. C.
1987-01-01
The Loads and Aeroelasticity Division's research accomplishments for FY 86 and research plans for FY 87 are presented. The work under each Branch (technical area) is described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to five year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fortmann, R.G.
1994-01-14
The goals during this period included the following objectives from the Statement of Work: in Phase 2A, completion of Subtask 2.1.4 -- Interpret data, of Task 2.1 -- Acquire 3-D seismic data; and, in Phase 2B, completion of Subtask 2.2.1 -- Solicit bids and award, and initiation of Subtask 2.2.2 -- Acquire cores, of Task 2.2 -- Drill slant hole. Subtask 2.1.4 -- Interpret data: Interpretation of the 3- D seismic survey was completed on a Sun Sparcstation10 workstation (UNIX based), using Landmark Graphics latest version of Seisworks 3D software. Subtask 2.2.2 -- Acquire cores: Sierra had picked a locationmore » and prepared a drilling plan for the slant/horizontal wellbores. Sierra was ready to submit an Application for Permit to Drill. However, due to the fact that Sierra entered into an agreement to sell the Badger Basin property, the drilling phase was put on hold.« less
ENGINEERED BARRIER SYSTEM: PHYSICAL AND CHEMICAL ENVIRONMENT
DOE Office of Scientific and Technical Information (OSTI.GOV)
R. Jarek
2005-08-29
The purpose of this model report is to describe the evolution of the physical and chemical environmental conditions within the waste emplacement drifts of the repository, including the drip shield and waste package surfaces. The resulting seepage evaporation and gas abstraction models are used in the total system performance assessment for the license application (TSPA-LA) to assess the performance of the engineered barrier system and the waste form. This report develops and documents a set of abstraction-level models that describe the engineered barrier system physical and chemical environment. Where possible, these models use information directly from other reports as input,more » which promotes integration among process models used for TSPA-LA. Specific tasks and activities of modeling the physical and chemical environment are included in ''Technical Work Plan for: Near-Field Environment and Transport In-Drift Geochemistry Model Report Integration'' (BSC 2005 [DIRS 173782], Section 1.2.2). As described in the technical work plan, the development of this report is coordinated with the development of other engineered barrier system reports. To be consistent with other project documents that address features, events, and processes (FEPs), Table 6.14.1 of the current report includes updates to FEP numbers and FEP subjects for two FEPs identified in the technical work plan (TWP) governing this report (BSC 2005 [DIRS 173782]). FEP 2.1.09.06.0A (Reduction-oxidation potential in EBS), as listed in Table 2 of the TWP (BSC 2005 [DIRS 173782]), has been updated in the current report to FEP 2.1.09.06.0B (Reduction-oxidation potential in Drifts; see Table 6.14-1). FEP 2.1.09.07.0A (Reaction kinetics in EBS), as listed in Table 2 of the TWP (BSC 2005 [DIRS 173782]), has been updated in the current report to FEP 2.1.09.07.0B (Reaction kinetics in Drifts; see Table 6.14-1). These deviations from the TWP are justified because they improve integration with FEPs documents. The updates have no impact on the model developed in this report.« less
[Management of human resources, materials, and organization processes in radioprotection].
Coppola, V
1999-06-01
The radiologist must learn to face daily management responsibilities and therefore he/she needs the relevant knowledge. Aside from the mechanisms of management accounting, which differ only slightly from similar analysis methods used in other centers, the managing radiologist (the person in charge) is directly responsible for planning, organizing, coordinating and controlling radiation protection, a major discipline characterizing diagnostic imaging. We will provide some practical management hints, keeping in mind that radiation protection must not be considered a simple (or annoying) technical task, but rather an extraordinary positive element for the radiologist's cultural differentiation and professional identity. The managing radiologist can use the theory and practice of management techniques successfully applied in business, customizing them to the ethics and economics of health care. Meeting the users' needs must obviously prevail on balancing the budget from both a logical and an accounting viewpoints, since non-profit organizations are involved. In radiological practice, distinguishing the management of human from structural resources (direct funding is not presently available) permits to use internal benchmarking for the former and controlled acquisition and planned replacement of technologies in the latter, obviously after evaluation of specific indicators and according to the relevant laws and technical guidelines. Managing human resources means safeguarding the patient, the operator and the population, which can be achieved or improved using benchmarking in a diagnostic imaging department. The references for best practice will be set per tabulas based on the relevant laws and (inter)national guidelines. The physical-technical and bureaucratic-administrative factors involved will be considered as process indices to evaluate the gap from normal standards. Among the different elements involved in managing structural resources, the appropriate acquisition of a piece of radiological equipment is important from both a radiation protection and an economic viewpoints. In the acquisition process, the first and the last steps (technology assessment and planned replacement, respectively) are specifically important for the radiologist and play a major role in global management. In both cases the radiologist must be able to lay out autonomous and objective working projects, also using evaluation algorithms.
Staff Considerations in Technical Services: The Chameleon Approach.
ERIC Educational Resources Information Center
Foster, Constance L.
1988-01-01
Discusses the need to cope effectively with technological transitions in library technical services and to plan for successful staff development. The areas discussed include changing job skills, financial planning, ergonomics, innovative partnerships, training, and an emphasis on human resources development. (21 references) (Author/CLB)
Waste Receiving and Processing (WRAP) Module 1 Hazards Assessment
DOE Office of Scientific and Technical Information (OSTI.GOV)
CAMPBELL, L.R.
1999-09-29
This document establishes the technical basis in support of Emergency Planning activities for the WRAP Module 1 Facility on the Hanford Site. Through this document, the technical basis for the development of facility specific Emergency Action Levels and Emergency Planning Zone is demonstrated.
7 CFR 1468.9 - Conservation farm plan.
Code of Federal Regulations, 2010 CFR
2010-01-01
.... Prior to contract approval, a conservation farm plan must be written and approved. In deciding whether... applicable NRCS field office technical guide or as approved by the State Conservationist. (e) Participants... participant's request, the NRCS may provide technical assistance to a participant. (1) Participants may, at...
Integrating Science with Technical and Vocational Areas.
ERIC Educational Resources Information Center
Snyder, Larry; Shreckengast, Craig
This guide presents learning activities and lesson plans that integrate science with technical and vocational areas. Activities and plans are organized under broad headings such as Environmental Science and Acid Rain Research; Criminal Justice, Chemistry, and Narcotics; Children's Education and Services; Cosmetology; and Health Professions.…
Technical and Occupational Shops.
ERIC Educational Resources Information Center
Ontario Dept. of Education, Toronto. School Planning and Building Research Section.
This booklet presents suggested plans and specifications for and discusses facilities common to technical and occupational shops. Drawings, room plans, and text illustrate specifications for drafting rooms, a welding shop, an automechanics shop, an auto body shop, and a high school greenhouse. Also included are facility designs for agricultural…
Kemper, Peter F; van Noord, Inge; de Bruijne, Martine; Knol, Dirk L; Wagner, Cordula; van Dyck, Cathy
2013-07-01
A lack of non-technical skills is increasingly recognised as an important underlying cause of adverse events in healthcare. The nature and number of things professionals communicate to each other can be perceived as a product of their use of non-technical skills. This paper describes the development and reliability of an instrument to measure and quantify the use of non-technical skills by direct observations of explicit professional oral communication (EPOC) in the clinical situation. In an iterative process we translated, tested and refined an existing checklist from the aviation industry, called self, human interaction, aircraft, procedures and environment, in the context of healthcare, notably emergency departments (ED) and intensive care units (ICU). The EPOC comprises six dimensions: assertiveness, working with others; task-oriented leadership; people-oriented leadership; situational awareness; planning and anticipation. Each dimension is specified into several concrete items reflecting verbal behaviours. The EPOC was evaluated in four ED and six ICU. In the ED and ICU, respectively, 378 and 1144 individual and 51 and 68 contemporaneous observations of individual staff members were conducted. All EPOC dimensions occur frequently, apart from assertiveness, which was hardly observed. Intraclass correlations for the overall EPOC score ranged between 0.85 and 0.91 and for underlying EPOC dimensions between 0.53 and 0.95. The EPOC is a new instrument for evaluating the use of non-technical skills in healthcare, which is reliable in two highly different settings. By quantifying professional behaviour the instrument facilitates measurement of behavioural change over time. The results suggest that EPOC can also be translated to other settings.
Kemper, Peter F; van Noord, Inge; de Bruijne, Martine; Knol, Dirk L; Wagner, Cordula; van Dyck, Cathy
2013-01-01
Background A lack of non-technical skills is increasingly recognised as an important underlying cause of adverse events in healthcare. The nature and number of things professionals communicate to each other can be perceived as a product of their use of non-technical skills. This paper describes the development and reliability of an instrument to measure and quantify the use of non-technical skills by direct observations of explicit professional oral communication (EPOC) in the clinical situation. Methods In an iterative process we translated, tested and refined an existing checklist from the aviation industry, called self, human interaction, aircraft, procedures and environment, in the context of healthcare, notably emergency departments (ED) and intensive care units (ICU). The EPOC comprises six dimensions: assertiveness, working with others; task-oriented leadership; people-oriented leadership; situational awareness; planning and anticipation. Each dimension is specified into several concrete items reflecting verbal behaviours. The EPOC was evaluated in four ED and six ICU. Results In the ED and ICU, respectively, 378 and 1144 individual and 51 and 68 contemporaneous observations of individual staff members were conducted. All EPOC dimensions occur frequently, apart from assertiveness, which was hardly observed. Intraclass correlations for the overall EPOC score ranged between 0.85 and 0.91 and for underlying EPOC dimensions between 0.53 and 0.95. Conclusions The EPOC is a new instrument for evaluating the use of non-technical skills in healthcare, which is reliable in two highly different settings. By quantifying professional behaviour the instrument facilitates measurement of behavioural change over time. The results suggest that EPOC can also be translated to other settings. PMID:23412933
High-speed civil transport issues and technology program
NASA Technical Reports Server (NTRS)
Hewett, Marle D.
1992-01-01
A strawman program plan is presented, consisting of technology developments and demonstrations required to support the construction of a high-speed civil transport. The plan includes a compilation of technology issues related to the development of a transport. The issues represent technical areas in which research and development are required to allow airframe manufacturers to pursue an HSCT development. The vast majority of technical issues presented require flight demonstrated and validated solutions before a transport development will be undertaken by the industry. The author believes that NASA is the agency best suited to address flight demonstration issues in a concentrated effort. The new Integrated Test Facility at NASA Dryden Flight Research Facility is considered ideally suited to the task of supporting ground validations of proof-of-concept and prototype system demonstrations before night demonstrations. An elaborate ground hardware-in-the-loop (iron bird) simulation supported in this facility provides a viable alternative to developing an expensive fill-scale prototype transport technology demonstrator. Drygen's SR-71 assets, modified appropriately, are a suitable test-bed for supporting flight demonstrations and validations of certain transport technology solutions. A subscale, manned or unmanned flight demonstrator is suitable for flight validation of transport technology solutions, if appropriate structural similarity relationships can be established. The author contends that developing a full-scale prototype transport technology demonstrator is the best alternative to ensuring that a positive decision to develop a transport is reached by the United States aerospace industry.
Field Test of the Methodology for Succession Planning for Technical Experts
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cain, Ronald A.; Kirk, Bernadette Lugue; Agreda, Carla L.
This report complements A Methodology for Succession Planning for Technical Experts (Ron Cain, Shaheen Dewji, Carla Agreda, Bernadette Kirk, July 2017), which describes a methodology for identifying and evaluating the loss of key technical skills at nuclear operations facilities. This report targets the methodology for identifying critical skills, hereafter referred to as “core competencies”. The methodology has been field tested by interviewing selected retiring subject matter experts (SMEs).
Evaluation of scheduling techniques for payload activity planning
NASA Technical Reports Server (NTRS)
Bullington, Stanley F.
1991-01-01
Two tasks related to payload activity planning and scheduling were performed. The first task involved making a comparison of space mission activity scheduling problems with production scheduling problems. The second task consisted of a statistical analysis of the output of runs of the Experiment Scheduling Program (ESP). Details of the work which was performed on these two tasks are presented.
Guide to DCP Study Close-Out: Milestones and Tasks | Division of Cancer Prevention
This guide assists Consortium Lead Organization (CLO) planning for DCP study close-out. Study close-out tasks are organized under milestones, which help mark progress toward completion of the close-out process. Once tasks associated with a milestone are underway, planning for the next milestone may begin. Click on a milestone to view the associated close-out tasks. |
ERIC Educational Resources Information Center
Javad Ahmadian, Mohammad; Tavakoli, Mansoor; Vahid Dastjerdi, Hossein
2015-01-01
This study investigates the combined effects of task-based careful online planning and the storyline structure of a task on second language performance (complexity, accuracy and fluency). Sixty intermediate EFL learners were randomly assigned to four groups (n = 15). Participants were asked to perform two tasks with different degrees of storyline…
32 CFR 203.10 - Eligible activities.
Code of Federal Regulations, 2013 CFR
2013-07-01
... with technical reports that summarize data and support cleanup decisions. Technical assistance may be provided to review plans and interpret technical reports for community members of RABs and TRCs. These...) MISCELLANEOUS TECHNICAL ASSISTANCE FOR PUBLIC PARTICIPATION (TAPP) IN DEFENSE ENVIRONMENTAL RESTORATION...
32 CFR 203.10 - Eligible activities.
Code of Federal Regulations, 2014 CFR
2014-07-01
... with technical reports that summarize data and support cleanup decisions. Technical assistance may be provided to review plans and interpret technical reports for community members of RABs and TRCs. These...) MISCELLANEOUS TECHNICAL ASSISTANCE FOR PUBLIC PARTICIPATION (TAPP) IN DEFENSE ENVIRONMENTAL RESTORATION...
32 CFR 203.10 - Eligible activities.
Code of Federal Regulations, 2012 CFR
2012-07-01
... with technical reports that summarize data and support cleanup decisions. Technical assistance may be provided to review plans and interpret technical reports for community members of RABs and TRCs. These...) MISCELLANEOUS TECHNICAL ASSISTANCE FOR PUBLIC PARTICIPATION (TAPP) IN DEFENSE ENVIRONMENTAL RESTORATION...
Remigereau, Chrystelle; Roy, Arnaud; Costini, Orianne; Osiurak, François; Jarry, Christophe; Le Gall, Didier
2016-01-01
It is well-known that even toddlers are able to manipulate tools in an appropriate manner according to their physical properties. The ability of children to make novel tools in order to solve problems is, however, surprisingly limited. In adults, mechanical problem solving (MPS) has been proposed to be supported by “technical reasoning skills,” which are thought to be involved in every situation requiring the use of a tool (whether conventional or unusual). The aim of this study was to investigate the typical development of real tool use (RTU) skills and its link with technical reasoning abilities in healthy children. Three experimental tasks were adapted from those used with adults: MPS (three different apparatus), RTU (10 familiar tool-object pairs), and functional knowledge (FK; 10 functional picture matching with familiar tools previously used). The tasks were administered to 85 healthy children divided into six age groups (from 6 to 14 years of age). The results revealed that RTU (p = 0.01) and MPS skills improve with age, even if this improvement differs according to the apparatus for the latter (p < 0.01 for the Hook task and p < 0.05 for the Sloping task). Results also showed that MPS is a better predictor of RTU than FK, with a significant and greater weight (importance weight: 0.65; Estimate ± Standard Error: 0.27 ± 0.08). Ours findings suggest that RTU and technical reasoning develop jointly in children, independently from development of FK. In addition, technical reasoning appears partially operative from the age of six onward, even though the outcome of these skills depends of the context in which they are applied (i.e., the type of apparatus). PMID:27877141
ISOLOK VALVE ACCEPTANCE TESTING FOR DWPF SME SAMPLING PROCESS
DOE Office of Scientific and Technical Information (OSTI.GOV)
Edwards, T.; Hera, K.; Coleman, C.
2011-12-05
Evaluation of the Defense Waste Processing Facility (DWPF) Chemical Process Cell (CPC) cycle time identified several opportunities to improve the CPC processing time. Of the opportunities, a focus area related to optimizing the equipment and efficiency of the sample turnaround time for DWPF Analytical Laboratory was identified. The Mechanical Systems & Custom Equipment Development (MS&CED) Section of the Savannah River National Laboratory (SRNL) evaluated the possibility of using an Isolok{reg_sign} sampling valve as an alternative to the Hydragard{reg_sign} valve for taking process samples. Previous viability testing was conducted with favorable results using the Isolok sampler and reported in SRNL-STI-2010-00749 (1).more » This task has the potential to improve operability, reduce maintenance time and decrease CPC cycle time. This report summarizes the results from acceptance testing which was requested in Task Technical Request (TTR) HLW-DWPF-TTR-2010-0036 (2) and which was conducted as outlined in Task Technical and Quality Assurance Plan (TTQAP) SRNL-RP-2011-00145 (3). The Isolok to be tested is the same model which was tested, qualified, and installed in the Sludge Receipt Adjustment Tank (SRAT) sample system. RW-0333P QA requirements apply to this task. This task was to qualify the Isolok sampler for use in the DWPF Slurry Mix Evaporator (SME) sampling process. The Hydragard, which is the current baseline sampling method, was used for comparison to the Isolok sampling data. The Isolok sampler is an air powered grab sampler used to 'pull' a sample volume from a process line. The operation of the sampler is shown in Figure 1. The image on the left shows the Isolok's spool extended into the process line and the image on the right shows the sampler retracted and then dispensing the liquid into the sampling container. To determine tank homogeneity, a Coliwasa sampler was used to grab samples at a high and low location within the mixing tank. Data from the two locations were compared to determine if the contents of the tank were well mixed. The Coliwasa sampler is a tube with a stopper at the bottom and is designed to obtain grab samples from specific locations within the drum contents. A position paper (4) was issued to address the prototypic flow loop issues and simulant selections. A statistically designed plan (5) was issued to address the total number of samples each sampler needed to pull, to provide the random order in which samples were pulled and to group samples for elemental analysis. The TTR required that the Isolok sampler perform as well as the Hydragard sampler during these tests to ensure the acceptability of the Isolok sampler for use in the DWPF sampling cells. Procedure No.L9.4-5015 was used to document the sample parameters and process steps. Completed procedures are located in R&D Engineering job folder 23269.« less
Brown, Michael; Shaw, Dominick; Sharples, Sarah; Jeune, Ivan Le; Blakey, John
2015-01-01
Objectives The skill set required for junior doctors to work efficiently and safely Out of Hours (OoH) in hospitals has not been established. This is despite the OoH period representing 75% of the year and it being the time of highest mortality. We set out to explore the expectations of medical students and experiences of junior doctors of the non-technical skills needed to work OoH. Design Survey-based cross-sectional study informed by focus groups. Setting Online survey with participants from five large teaching hospitals across the UK. Participants 300 Medical Students and Doctors Outcome measure Participants ranked the importance of non-technical skills, as identified by literature review and focus groups, needed for OoH care. Results The focus groups revealed a total of eight non-technical skills deemed to be important. In the survey ‘Task Prioritisation’ (mean rank 1.617) was consistently identified as the most important non-technical skill. Stage of training affected the ranking of skills, with significant differences for ‘Communication with Senior Doctors’, ‘Dealing with Clinical Isolation’, ‘Task Prioritisation’ and ‘Communication with Patients’. Importantly, there was a significant discrepancy between the medical student expectations and experiences of doctors undertaking work. Conclusions Our findings suggest that medical staff particularly value task prioritisation skills; however, these are not routinely taught in medical schools. The discrepancy between expectations of students and experience of doctors reinforces the idea that there is a gap in training. Doctors of different grades place different importance on specific non-technical skills with implications for postgraduate training. There is a pressing need for medical schools and deaneries to review non-technical training to include more than communication skills. PMID:25687899
The Technical Work Plan Tracking Tool
NASA Technical Reports Server (NTRS)
Chullen, Cinda; Leighton, Adele; Weller, Richard A.; Woodfill, Jared; Parkman, William E.; Ellis, Glenn L.; Wilson, Marilyn M.
2003-01-01
The Technical Work Plan Tracking Tool is a web-based application that enables interactive communication and approval of contract requirements that pertain to the administration of the Science, Engineering, Analysis, and Test (SEAT) contract at Johnson Space Center. The implementation of the application has (1) shortened the Technical Work Plan approval process, (2) facilitated writing and documenting requirements in a performance-based environment with associated surveillance plans, (3) simplified the contractor s estimate of the cost for the required work, and (4) allowed for the contractor to document how they plan to accomplish the work. The application is accessible to over 300 designated NASA and contractor employees via two Web sites. For each employee, the application regulates access according to the employee s authority to enter, view, and/or print out diverse information, including reports, work plans, purchase orders, and financial data. Advanced features of this application include on-line approval capability, automatic e-mail notifications requesting review by subsequent approvers, and security inside and outside the firewall.
Smart roadside initiative gap analysis : trucking technology utilization.
DOT National Transportation Integrated Search
2014-04-01
This technical memorandum synthesizes and summarizes the American Transportation Research Institutes (ATRI) findings for Subtask 2.3 of the Smart Roadside Initiative (SRI) Gap Analysis. As part of this task, ATRI: 1. completed a technical literatu...
FRATIS concept of operations : assess test readiness of FRATIS (task 4).
DOT National Transportation Integrated Search
2012-08-01
This technical memorandum presents a concise assessment of the key technical and nontechnical issues and limitations related to field-testing the Freight Advanced Traveler Information System (FRATIS) Dynamic Mobility Applications (DMA) bundle and its...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-17
... Specifications Combustion Engineering Plants.'' Specifically, the proposed change revises various TSs to add a... Technical Details TSTF-426, Revision 5, is applicable to all Combustion Engineering- designed nuclear power...
Efficiency in Rule- vs. Plan-Based Movements Is Modulated by Action-Mode
Scheib, Jean P. P.; Stoll, Sarah; Thürmer, J. Lukas; Randerath, Jennifer
2018-01-01
The rule/plan motor cognition (RPMC) paradigm elicits visually indistinguishable motor outputs, resulting from either plan- or rule-based action-selection, using a combination of essentially interchangeable stimuli. Previous implementations of the RPMC paradigm have used pantomimed movements to compare plan- vs. rule-based action-selection. In the present work we attempt to determine the generalizability of previous RPMC findings to real object interaction by use of a grasp-to-rotate task. In the plan task, participants had to use prospective planning to achieve a comfortable post-handle rotation hand posture. The rule task used implementation intentions (if-then rules) leading to the same comfortable end-state. In Experiment A, we compare RPMC performance of 16 healthy participants in pantomime and real object conditions of the experiment, within-subjects. Higher processing efficiency of rule- vs. plan-based action-selection was supported by diffusion model analysis. Results show a significant response-time increase in the pantomime condition compared to the real object condition and a greater response-time advantage of rule-based vs. plan-based actions in the pantomime compared to the real object condition. In Experiment B, 24 healthy participants performed the real object RPMC task in a task switching vs. a blocked condition. Results indicate that plan-based action-selection leads to longer response-times and less efficient information processing than rule-based action-selection in line with previous RPMC findings derived from the pantomime action-mode. Particularly in the task switching mode, responses were faster in the rule compared to the plan task suggesting a modulating influence of cognitive load. Overall, results suggest an advantage of rule-based action-selection over plan-based action-selection; whereby differential mechanisms appear to be involved depending on the action-mode. We propose that cognitive load is a factor that modulates the advantageous effect of implementation intentions in motor cognition on different levels as illustrated by the varying speed advantages and the variation in diffusion parameters per action-mode or condition, respectively. PMID:29593612
ERIC Educational Resources Information Center
Salem County Board for Vocational Education, Woodstown, NJ.
A strategic plan for vocational-technical education (VTE) in Salem County, New Jersey, in the year 2002 was developed by the county board of VTE and county advisory board with input from students, parents, employers, elected officials, and the community in general. Six strategic planning subcommittees were formed to review the district's VTE…
Can a senior house officer's time be used more effectively?
Mitchell, J; Hayhurst, C; Robinson, S M
2004-09-01
To determine the amount of time senior house officers (SHO) spent performing tasks that could be delegated to a technician or administrative assistant and therefore to quantify the expected benefit that could be obtained by employing such physicians' assistants (PA). SHOs working in the emergency department were observed for one week by pre-clinical students who had been trained to code and time each task performed by SHOs. Activity was grouped into four categories (clinical, technical, administrative, and other). Those activities in the technical and administrative categories were those we believed could be performed by a PA. The SHOs worked 430 hours in total, of which only 25 hours were not coded due to lack of an observer. Of the 405 hours observed 86.2% of time was accounted for by the various codes. The process of taking a history and examining patients accounted for an average of 22% of coded time. Writing the patient's notes accounted for an average of 20% of coded time. Discussion with relatives and patients accounted for 4.7% of coded time and performing procedures accounted for 5.2% of coded time. On average across all shifts, 15% of coded time was spent doing either technical or administrative tasks. In this department an average of 15% of coded SHOs working time was spent performing administrative and technical tasks, rising to 17% of coded time during a night shift. This is equivalent to an average time of 78 minutes per 10 hour shift/SHO. Most tasks included in these categories could be performed by PAs thus potentially decreasing patient waiting times, improving risk management, allowing doctors to spend more time with their patients, and possibly improving doctors' training.
,
1995-01-01
The Intergovernmental Task Force on Monitoring Water Quality (ITFM) prepared this report in collaboration with representatives of all levels of government and the private sector. The report recommends a strategy for nationwide water-quality monitoring and technical monitoring improvements to support sound water-quality decisionmaking. The strategy is intended to achieve a better return on public and private investments in monitoring, environmental protection, and natural resources management. It is also designed to expand the base of information useful to a variety of users at multiple geographic scales. Institutional and technical changes are needed to improve water-quality monitoring and to meet the full range of monitoring requirements. Monitoring must be incorporated as a critical element of program planning, implementation, and evaluation. The strategy includes recommendations in many key elements, such as the development of goal-oriented monitoring and indicators, institutional collaboration, and methods comparability. Initial actions have been taken to implement the strategy. Several Federal agencies have jointly purchased and shared remotely sensed land-cover information needed for water assessment. Major agency data systems are using common data-element names and reference tables that will ensure easy sharing of data. A number of States have held meetings with collectors of water information to initiate statewide monitoring strategies. New monitoring guidance has been developed for Federal water-quality grants to States. Many State offices have changed monitoring programs to place emphasis on priority watersheds and to improve assessment of water quality. As the competition increases for adequate supplies of clean water, concerns about public health and the environment escalate, and more demands are placed on the water information infrastructure. To meet these demands, the collaborative approach has already produced benefits, which will continue to grow as the recommendations are implemented
Dźwiarek, Marek; Latała, Agata
2016-01-01
This article presents an analysis of results of 1035 serious and 341 minor accidents recorded by Poland's National Labour Inspectorate (PIP) in 2005-2011, in view of their prevention by means of additional safety measures applied by machinery users. Since the analysis aimed at formulating principles for the application of technical safety measures, the analysed accidents should bear additional attributes: the type of machine operation, technical safety measures and the type of events causing injuries. The analysis proved that the executed tasks and injury-causing events were closely connected and there was a relation between casualty events and technical safety measures. In the case of tasks consisting of manual feeding and collecting materials, the injuries usually occur because of the rotating motion of tools or crushing due to a closing motion. Numerous accidents also happened in the course of supporting actions, like removing pollutants, correcting material position, cleaning, etc.
Dźwiarek, Marek; Latała, Agata
2016-01-01
This article presents an analysis of results of 1035 serious and 341 minor accidents recorded by Poland's National Labour Inspectorate (PIP) in 2005–2011, in view of their prevention by means of additional safety measures applied by machinery users. Since the analysis aimed at formulating principles for the application of technical safety measures, the analysed accidents should bear additional attributes: the type of machine operation, technical safety measures and the type of events causing injuries. The analysis proved that the executed tasks and injury-causing events were closely connected and there was a relation between casualty events and technical safety measures. In the case of tasks consisting of manual feeding and collecting materials, the injuries usually occur because of the rotating motion of tools or crushing due to a closing motion. Numerous accidents also happened in the course of supporting actions, like removing pollutants, correcting material position, cleaning, etc. PMID:26652689
NASA Technical Reports Server (NTRS)
Roberts, Barney B.; Bland, Dan
1988-01-01
The Office of Exploration (OEXP) at NASA has been tasked with defining and recommending alternatives for an early 1990's national decision on a focused program of manned exploration of the Solar System. The Mission analysis and System Engineering (MASE) group, which is managed by the Exploration Studies Office at the Johnson Space Center, is responsible for coordinating the technical studies necessary for accomplishing such a task. This technical report, produced by the MASE, describes the process used to conduct exploration studies and discusses the mission developed in a case study approach. The four case studies developed in FY88 include: (1) a manned expedition to PHOBOS; (2) a manned expedition to MARS; (3) a lunar surface observatory; and a lunar outpost to early Mars evolution. The final outcome of this effort is a set of programmatic and technical conclusions and recommendations for the following year's work.
Effects of Pretask Modeling on Attention to Form and Question Development
ERIC Educational Resources Information Center
Kim, YouJin
2013-01-01
Over the last two decades, a growing body of research has shown positive impacts for task planning in task-based instruction (e.g., Ellis, 2005; Foster & Skehan, 1996). However, what learners plan during pretask planning, and whether any specific planning strategies are more beneficial in encouraging learners to attend to linguistic forms and…
Natural stones of historic and future importance in Sweden
NASA Astrophysics Data System (ADS)
Schouenborg, Björn; Andersson, Jenny; Göransson, Mattias
2013-04-01
Several activities and responsibilities of the Geological Survey of Sweden (SGU) are related to the work of the newly formed international Heritage Stone Task Group (HSTG) for designating historically important stones. SGU is among other things a referral organization, frequently dealing with the preparation of statements in connection with the quarrying permit applications of stone producers. When preparing these statements, SGU takes into account a number of parameters, e.g. the importance for local and regional business development, historic importance, area of occurrence, quality of the geological documentation of the stone type, peculiarities of the stone types and technical properties relevant for the intended use. Traditionally, SGU has not worked with bedrock mapping looking at the potential of natural stones production but more commonly looking at the potential production of aggregates, industrial minerals and metals. The competence is, therefore, presently being built up with new databases over important natural stone types and definition of criteria for their selection etc. In this respect the criteria defined by the HSTG provide important help. This work goes hand in hand with the task of proposing stone-deposits and quarries of "national interest". The criteria for selection of a stone type, quarry etc as one of national interest are currently being revised. SGU plays an important role in this work. However, the final decision and appointment lies in the hands of the Swedish Board of Housing, Building and Planning (Boverket), an authority dealing with sustainable land use and regional development, town and country planning. Boverket supervises how the planning legislation is handled by the municipal authorities and the county administrative boards. The two latter organizations are those in charge of giving extraction permits for stone quarrying. The "Hallandia gneiss", of SW Sweden, is described as a case story and presented in this paper. Keywords: Hallandia gneiss, natural stones, historic stones, urban planning and building
Geomatics, Support for an Efficient Urban Planning
NASA Astrophysics Data System (ADS)
Moscovici, Anca-Maria; Grecea, Carmen
2017-10-01
Geomatics represents a natural consequence of the accelerated development of information technology; it’s a combination of the basic concepts of Geodesy and Geoinformation and encompasses a wide range of the fields, including tools and techniques used in surveying, mapping, remote sensing, Geographic information systems (GIS), global navigation systems by satellite (GPS), geography, planning and decision making in almost all areas: infrastructure, environment, demography, urbanism, health, sociology, economics, tourism, administration, transportation and many others. As a consequence of the population growth and industrialization, society has become more complex for government and other institutions, with the result that more complex and complicated tasks have to be performed. In order to solve these tasks properly, more and more information is required. Having passed through the stages of agricultural and industrial societies, we now live in an information society. Town planning cadastre defines itself as a particular cadastre, a part of the general one, which involves inventory and systematic evidence of the buildings, fields, networks and utilities inside towns. All these problems regard both technical and economic aspects. In order to automate cadastral activity, the first important procedure is to collect all physical information from a certain territory, which will supply later on the database for town cadastre. Geodetic activity for engineering projects is able to provide accurate solutions for positioning, setting out, control, mapping in order to cover basic needs of land administrative information and decision making for the local authorities. The paper points out the purpose and the importance of town planning cadastre for providing the exact data on the situation of the urban fond in order to identify its needs; it presents the case of Timisoara city located in the western side of Romania that has been chosen as the European Capital of Culture for 2021. As a national strategy, a key component in the policies of growth poles is promoting urban development as part of a long-term project with sustainable impact on economic, cultural and social development.
Oehl, M; Sutter, C
2015-05-01
With aging visual feedback becomes increasingly relevant in action control. Consequently, visual device and task characteristics should more and more affect tool use. Focussing on late working age, the present study aims to investigate age-related differences in processing task irrelevant (display size) and task relevant visual information (task difficulty). Young and middle-aged participants (20-35 and 36-64 years of age, respectively) sat in front of a touch screen with differently sized active touch areas (4″ to 12″) and performed pointing tasks with differing task difficulties (1.8-5 bits). Both display size and age affected pointing performance, but the two variables did not interact and aiming duration moderated both effects. Furthermore, task difficulty affected the pointing durations of middle-aged adults moreso than those of young adults. Again, aiming duration accounted for the variance in the data. The onset of an age-related decline in aiming duration can be clearly located in middle adulthood. Thus, the fine psychomotor ability "aiming" is a moderator and predictor for age-related differences in pointing tasks. The results support a user-specific design for small technical devices with touch interfaces. Copyright © 2014 Elsevier Ltd and The Ergonomics Society. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pavel Hejzlar, Peter Yarsky, Mike Driscoll, Dan Wachs, Kevan Weaver, Ken Czerwinski, Mike Pope, James Parry, Theron D. Marshall, Cliff B. Davis, Dustin Crawford, Thomas Hartmann, Pradip Saha; Hejzlar, Pavel; Yarsky, Peter
2005-01-31
This project is organized under four major tasks (each of which has two or more subtasks) with contributions among the three collaborating organizations (MIT, INEEL and ANL-West): Task A: Core Physics and Fuel Cycle; Task B: Core Thermal Hydraulics; Task C: Plant Design; Task D: Fuel Design The lead PI, Michael J. Driscoll, has consolidated and summarized the technical progress submissions provided by the contributing investigators from all sites, under the above principal task headings.
MSFC's Advanced Space Propulsion Formulation Task
NASA Technical Reports Server (NTRS)
Huebner, Lawrence D.; Gerrish, Harold P.; Robinson, Joel W.; Taylor, Terry L.
2012-01-01
In NASA s Fiscal Year 2012, a small project was undertaken to provide additional substance, depth, and activity knowledge to the technology areas identified in the In-Space Propulsion Systems Roadmap, Technology Area 02 (TA-02), as created under the auspices of the NASA Office of the Chief Technologist (OCT). This roadmap was divided into four basic groups: (1) Chemical Propulsion, (2) Non-chemical Propulsion, (3) Advanced (TRL<3) Propulsion Technologies, and (4) Supporting Technologies. The first two were grouped according to the governing physics. The third group captured technologies and physic concepts that are at a lower TRL level. The fourth group identified pertinent technical areas that are strongly coupled with these related areas which could allow significant improvements in performance. There were a total of 45 technologies identified in TA-02, and 25 of these were studied in this formulation task. The goal of this task was to provide OCT with a knowledge-base for decisionmaking on advanced space propulsion technologies and not waste money by unintentionally repeating past projects or funding the technologies with minor impacts. This formulation task developed the next level of detail for technologies described and provides context to OCT where investments should be made. The presentation will begin with the list of technologies from TA-02, how they were prioritized for this study, and details on what additional data was captured for the technologies studied. Following this, some samples of the documentation will be provided, followed by plans on how the data will be made accessible.
48 CFR 2052.211-71 - Technical progress report.
Code of Federal Regulations, 2010 CFR
2010-10-01
... investigator, the contract period of performance, and the period covered by the report. Each report must include the following for each discrete task/task order: (a) A listing of the efforts completed during the...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chu, C.I.C.; Gillespie, B.L.
One of the most perplexing problems facing the coal industry is how to properly dispose of the waste and/or even recovery a small fraction of the Btu value of the waste, while minimizing the environmental concerns. UCC Research considers this monumental environmental problems as an opportunity to recovery useable organic materials and reduce the environmental problems created by coal waste. Mild gasification is the method used by UCC Research to realize these objectives. Coal feedstocks are fed into the mild gasification system yielding liquids, char, and gases for commercial application. The program consists of seven tasks: Task 1, Characterize Managementmore » of Coal Preparation Wastes; Task 2, Review Design Specifications and Prepare Preliminary Test Plan; Task 3, Select and Characterize Test Feedstocks; Task 4, Acquire/Construct Process Elements; Task 5, Prepare Final Test Plan; Task 6, Implement Final Test Plan; Task 7, Analyze Test Results and Assess System Economics. A schedule of the program is given. The program was initiated on September 30, 1984. Tasks 1, 2, 3, 4, 5, and 6 have been completed. Work is continuing on Task 7.« less
Advanced automation for in-space vehicle processing
NASA Technical Reports Server (NTRS)
Sklar, Michael; Wegerif, D.
1990-01-01
The primary objective of this 3-year planned study is to assure that the fully evolved Space Station Freedom (SSF) can support automated processing of exploratory mission vehicles. Current study assessments show that required extravehicular activity (EVA) and to some extent intravehicular activity (IVA) manpower requirements for required processing tasks far exceeds the available manpower. Furthermore, many processing tasks are either hazardous operations or they exceed EVA capability. Thus, automation is essential for SSF transportation node functionality. Here, advanced automation represents the replacement of human performed tasks beyond the planned baseline automated tasks. Both physical tasks such as manipulation, assembly and actuation, and cognitive tasks such as visual inspection, monitoring and diagnosis, and task planning are considered. During this first year of activity both the Phobos/Gateway Mars Expedition and Lunar Evolution missions proposed by the Office of Exploration have been evaluated. A methodology for choosing optimal tasks to be automated has been developed. Processing tasks for both missions have been ranked on the basis of automation potential. The underlying concept in evaluating and describing processing tasks has been the use of a common set of 'Primitive' task descriptions. Primitive or standard tasks have been developed both for manual or crew processing and automated machine processing.
Brunckhorst, Oliver; Shahid, Shahab; Aydin, Abdullatif; McIlhenny, Craig; Khan, Shahid; Raza, Syed Johar; Sahai, Arun; Brewin, James; Bello, Fernando; Kneebone, Roger; Khan, Muhammad Shamim; Dasgupta, Prokar; Ahmed, Kamran
2015-09-01
Current training modalities within ureteroscopy have been extensively validated and must now be integrated within a comprehensive curriculum. Additionally, non-technical skills often cause surgical error and little research has been conducted to combine this with technical skills teaching. This study therefore aimed to develop and validate a curriculum for semi-rigid ureteroscopy, integrating both technical and non-technical skills teaching within the programme. Delphi methodology was utilised for curriculum development and content validation, with a randomised trial then conducted (n = 32) for curriculum evaluation. The developed curriculum consisted of four modules; initially developing basic technical skills and subsequently integrating non-technical skills teaching. Sixteen participants underwent the simulation-based curriculum and were subsequently assessed, together with the control cohort (n = 16) within a full immersion environment. Both technical (Time to completion, OSATS and a task specific checklist) and non-technical (NOTSS) outcome measures were recorded with parametric and non-parametric analyses used depending on the distribution of our data as evaluated by a Shapiro-Wilk test. Improvements within the intervention cohort demonstrated educational value across all technical and non-technical parameters recorded, including time to completion (p < 0.01), OSATS scores (p < 0.001), task specific checklist scores (p = 0.011) and NOTSS scores (p < 0.001). Content validity, feasibility and acceptability were all demonstrated through curriculum development and post-study questionnaire results. The current developed curriculum demonstrates that integrating both technical and non-technical skills teaching is both educationally valuable and feasible. Additionally, the curriculum offers a validated simulation-based training modality within ureteroscopy and a framework for the development of other simulation-based programmes.
Alternative sample sizes for verification dose experiments and dose audits
NASA Astrophysics Data System (ADS)
Taylor, W. A.; Hansen, J. M.
1999-01-01
ISO 11137 (1995), "Sterilization of Health Care Products—Requirements for Validation and Routine Control—Radiation Sterilization", provides sampling plans for performing initial verification dose experiments and quarterly dose audits. Alternative sampling plans are presented which provide equivalent protection. These sampling plans can significantly reduce the cost of testing. These alternative sampling plans have been included in a draft ISO Technical Report (type 2). This paper examines the rational behind the proposed alternative sampling plans. The protection provided by the current verification and audit sampling plans is first examined. Then methods for identifying equivalent plans are highlighted. Finally, methods for comparing the cost associated with the different plans are provided. This paper includes additional guidance for selecting between the original and alternative sampling plans not included in the technical report.
NASA Technical Reports Server (NTRS)
Garofalo, Anthony A.
2013-01-01
The purpose of the project is to perform analysis of data using the Systems Engineering Educational Discovery (SEED) program data from 2011 and 2012 Fluid Vessel Quantity using Non-Invasive PZT Technology flight volume measurements under Zero G conditions (parabolic Plane flight data). Also experimental planning and lab work for future sub-orbital experiments to use the NASA PZT technology for fluid volume measurement. Along with conducting data analysis of flight data, I also did a variety of other tasks. I provided the lab with detailed technical drawings, experimented with 3d printers, made changes to the liquid nitrogen skid schematics, and learned how to weld. I also programmed microcontrollers to interact with various sensors and helped with other things going on around the lab.
Towards a Mars base - Critical steps for life support on the moon and beyond
NASA Technical Reports Server (NTRS)
Rummel, John D.
1992-01-01
In providing crew life support for future exploration missions, overall exploration objectives will drive the life support solutions selected. Crew size, mission tasking, and exploration strategy will determine the performance required from life support systems. Human performance requirements, for example, may be offset by the availability of robotic assistance. Once established, exploration requirements for life support will be weighed against the financial and technical risks of developing new technologies and systems. Other considerations will include the demands that a particular life support strategy will make on planetary surface site selection, and the availability of precursor mission data to support EVA and in situ resource recovery planning. As space exploration progresses, the diversity of life support solutions that are implemented is bound to increase.
NASA Technical Reports Server (NTRS)
Garofalo, Anthony A
2013-01-01
The purpose of the project is to perform analysis of data using the Systems Engineering Educational Discovery (SEED) program data from 2011 and 2012 Fluid Vessel Quantity using Non-Invasive PZT Technology flight volume measurements under Zero G conditions (parabolic Plane flight data). Also experimental planning and lab work for future sub-orbital experiments to use the NASA PZT technology for fluid volume measurement. Along with conducting data analysis of flight data, I also did a variety of other tasks. I provided the lab with detailed technical drawings, experimented with 3d printers, made changes to the liquid nitrogen skid schematics, and learned how to weld. I also programmed microcontrollers to interact with various sensors and helped with other things going on around the lab.
Creative Practice : Design and Manufacturing of ‘CD Crusher’
NASA Astrophysics Data System (ADS)
Yamamoto, Koji; Senda, Shinkoh; Fukumori, Tsutom; Sato, Kazuo
A practice program for graduate students in mechanical engineering has been developed. The task of this training is to design and manufacture an original ‘CD crusher’ , a machine to mechanically destroy compact disks after use. This is a competition among groups of students creating their original CD crusher which fulfills the regulation. The regulation is that the crusher has to use rotational blades cutting the CDs. Same sized blades are supplied to the students groups. They are fabricated from a steel bar through cutting, annealing and quenching processes by the presence of students. Technical staffs are ready to help students on the whole way of the practice. However, they encourage initiative by the students from planning to manufacturing. Students satisfied at the practice according to the comments after competition.
From the microscope to the macroscopic: changing from the bench to portfolio management
Sachs, Michael
2017-01-01
A role in portfolio management is ideal for individuals who enjoy tackling challenges that have both technical and business components. Portfolio management provides objective insights and analytics to support research and development decision making and planning. Successful practitioners usually have strong analytical abilities developed from a background in either science or business. Portfolio managers often advise key decision makers at both the team and senior management level and thus require robust oral, written, and interpersonal communication skills. Day-to-day tasks are rarely the same, and comfort with change and the unknown is essential. Here I will discuss my experience as a portfolio manager in a larger biopharmaceutical company and the skills from academic research I leveraged to make the transition. PMID:29084911
Technical Basis of Scaling Relationships for the Pretreatment Engineering Platform
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kuhn, William L.; Arm, Stuart T.; Huckaby, James L.
Pacific Northwest National Laboratory has been tasked by Bechtel National Inc. (BNI) on the River Protection Project-Waste Treatment Plant (RPP-WTP) project to perform research and development activities. The Pretreatment Engineering Platform (PEP) is being designed and constructed as part of a plan to respond to an issue raised by the WTP External Flowsheet Review Team (EFRT) entitled “Undemonstrated Leaching Processes” and numbered M12. The PEP replicates the WTP leaching process using prototypic equipment and control strategies. The approach for scaling PEP performance data to predict WTP performance is critical to the successful resolution of the EFRT issue. This report describesmore » the recommended PEP scaling approach, PEP data interpretation and provides recommendations on test conduct and data requirements.« less
Bench-Scale Filtration Testing in Support of the Pretreatment Engineering Platform (PEP)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Billing, Justin M.; Daniel, Richard C.; Kurath, Dean E.
Pacific Northwest National Laboratory (PNNL) has been tasked by Bechtel National Inc. (BNI) on the River Protection Project-Hanford Tank Waste Treatment and Immobilization Plant (RPP-WTP) project to perform research and development activities to resolve technical issues identified for the Pretreatment Facility (PTF). The Pretreatment Engineering Platform (PEP) was designed, constructed and operated as part of a plan to respond to issue M12, “Undemonstrated Leaching Processes.” The PEP is a 1/4.5-scale test platform designed to simulate the WTP pretreatment caustic leaching, oxidative leaching, ultrafiltration solids concentration, and slurry washing processes. The PEP testing program specifies that bench-scale testing is to bemore » performed in support of specific operations, including filtration, caustic leaching, and oxidative leaching.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Edwards, T.; Hera, K.; Coleman, C.
2011-12-05
Evaluation of Defense Waste Processing Facility (DWPF) Chemical Process Cell (CPC) cycle time identified several opportunities to improve the CPC processing time. The Mechanical Systems & Custom Equipment Development (MS&CED) Section of the Savannah River National Laboratory (SRNL) recently completed the evaluation of one of these opportunities - the possibility of using an Isolok sampling valve as an alternative to the Hydragard valve for taking DWPF process samples at the Slurry Mix Evaporator (SME). The use of an Isolok for SME sampling has the potential to improve operability, reduce maintenance time, and decrease CPC cycle time. The SME acceptability testingmore » for the Isolok was requested in Task Technical Request (TTR) HLW-DWPF-TTR-2010-0036 and was conducted as outlined in Task Technical and Quality Assurance Plan (TTQAP) SRNLRP-2011-00145. RW-0333P QA requirements applied to the task, and the results from the investigation were documented in SRNL-STI-2011-00693. Measurement of the chemical composition of study samples was a critical component of the SME acceptability testing of the Isolok. A sampling and analytical plan supported the investigation with the analytical plan directing that the study samples be prepared by a cesium carbonate (Cs{sub 2}CO{sub 3}) fusion dissolution method and analyzed by Inductively Coupled Plasma - Optical Emission Spectroscopy (ICP-OES). The use of the cesium carbonate preparation method for the Isolok testing provided an opportunity for an additional assessment of this dissolution method, which is being investigated as a potential replacement for the two methods (i.e., sodium peroxide fusion and mixed acid dissolution) that have been used at the DWPF for the analysis of SME samples. Earlier testing of the Cs{sub 2}CO{sub 3} method yielded promising results which led to a TTR from Savannah River Remediation, LLC (SRR) to SRNL for additional support and an associated TTQAP to direct the SRNL efforts. A technical report resulting from this work was issued that recommended that the mixed acid method be replaced by the Cs{sub 2}CO{sub 3} method for the measurement of magnesium (Mg), sodium (Na), and zirconium (Zr) with additional testing of the method by DWPF Laboratory being needed before further implementation of the Cs{sub 2}CO{sub 3} method at that laboratory. While the SME acceptability testing of the Isolok does not address any of the open issues remaining after the publication of the recommendation for the replacement of the mixed acid method by the Cs{sub 2}CO{sub 3} method (since those issues are to be addressed by the DWPF Laboratory), the Cs{sub 2}CO{sub 3} testing associated with the Isolok testing does provide additional insight into the performance of the method as conducted by SRNL. The performance is to be investigated by looking to the composition measurement data generated by the samples of a standard glass, the Analytical Reference Glass - 1 (ARG-1), that were prepared by the Cs{sub 2}CO{sub 3} method and included in the SME acceptability testing of the Isolok. The measurements of these samples were presented as part of the study results, but no statistical analysis of these measurements was conducted as part of those results. It is the purpose of this report to provide that analysis, which was supported using JMP Version 7.0.2.« less
A Review of Content and Task Analysis Methodology. Technical Report No. 2.
ERIC Educational Resources Information Center
Gibbons, Andrew S.
A review of the literature related to methods for analyzing content or tasks prior to instructional development is presented. The review classifies methods according to a two-dimensional matrix. The first dimension differentiates phases of analysis, each dealing with content and tasks of a particular scope and each generating certain…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Li, Jun
This Field Implementation Plan (FIP) was prepared by Sandia National Laboratories, New Mexico (SNL/NM) and provides instruction on conducting a series of in-situ bioremediation (ISB) tests as described in the Revised Treatability Study Work Plan for In-Situ Bioremediation at the Technical Area-V Groundwater Area of Concern, referred to as the Revised Work Plan in this FIP. The Treatability Study is designed to gravity inject an electron-donor substrate and bioaugmentation bacteria into groundwater via three injection wells to perform bioremediation of the constituents of concern (COCs), nitrate and trichloroethene (TCE), in the regions with the highest concentrations at the Technical Area-Vmore » Groundwater (TAVG) Area of Concern (AOC). The Treatability Study will evaluate the effectiveness of bioremediation solution delivery and COC treatment over time. This FIP is designed for SNL/NM work planning and management. It is not intended to be submitted for regulator’s approval. The technical details presented in this FIP are subject to change based on field conditions, availability of equipment and materials, feasibility, and inputs from Sandia personnel and Aboveground Injection System contractor.« less
Succession Planning for Management Staff at a Western Canadian Postsecondary Technical Institute.
ERIC Educational Resources Information Center
Cembrowski, Barbara Joan; da Costa, Jose L.
This study used naturalistic inquiry to gain an understanding of how managerial personnel perceived career development and succession planning at a postsecondary technical institute in Canada. A total of nine individuals in three different career development stages completed semistructured interviews. It was found that managers perceived the…
Succession Planning for Management Staff at a Canadian Post Secondary Technical Institute.
ERIC Educational Resources Information Center
da Costa, Jose; Cembrowski, Barbara
2001-01-01
Analyzed interviews to explore how nine administrators, at three different career stages, perceived career-development and succession planning at a Canadian postsecondary technical institute. Managers attribute career success to possession of varied personal attributes, diverse work experiences, serendipity, and a fulfilling work environment. Job…
Chattanooga State Technical Community College Marketing Plan 1981-82.
ERIC Educational Resources Information Center
Hoppe, Sherry; Haddock, David
Chattanooga State Technical Community College's (CSTCC's) marketing plan is presented in six parallel sections. The first of these deals with building the overall image of the college, increasing community awareness, and disseminating general information. The other five sections focus on marketing the following college programs and services:…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-30
... Market and Planning Efficiency Through Improved Software; Notice of Technical Conference: Increasing Real-Time and Day- Ahead Market Efficiency Through Improved Software Take notice that Commission staff will...-time and day-ahead market efficiency through improved software. A detailed agenda with the list of and...
A Technical Evaluation of the First Stage of the Mediterranean Regional Project.
ERIC Educational Resources Information Center
Hollister, Robinson
Objectives of this technical evaluation concerning the transfer of experience in the development of human resources were to develop educational plans based upon comprehensive estimates of manpower requirements and to evaluate the methods used in estimating manpower requirements for educational planning. The methodology involved estimates of the…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-13
... Market and Planning Efficiency Through Improved Software; Notice of Technical Conference: Increasing Real-Time and Day- Ahead Market Efficiency Through Improved Software Take notice that Commission staff will... for increasing real-time and day-ahead market efficiency through improved software. This conference...
Development of Cooperative Planning for Technical-Vocational Programs.
ERIC Educational Resources Information Center
Cisco Junior Coll., TX.
During the past decade vocational-technical education in Texas has grown so rapidly that now attention must be given to enrollments, employment projections, and more efficient utilization of the limited resources available. Cisco and Ranger Junior Colleges serve essentially the same population and a plan for close cooperation and coordination is…
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Small business stationary source... PLANS Delaware § 52.460 Small business stationary source technical and environmental compliance... Environmental Control submitted a plan for the establishment and implementation of a Small Business Stationary...
Spatial Visualization ability improves with and without studying Technical Drawing.
Contreras, María José; Escrig, Rebeca; Prieto, Gerardo; Elosúa, M Rosa
2018-03-27
The results of several studies suggest that spatial ability can be improved through direct training with tasks similar to those integrated in the tests used to measure the ability. However, there is a greater interest in analyzing the effectiveness of indirect training such as games or of learning subjects that involve spatial processes to a certain extent. Thus, the objective of the present study was to analyze whether the indirect training in Technical Drawing improved the Spatial Visualization ability of Architecture students. For this purpose, a group of students enrolled in Fundamentals of Architecture were administered two tests, a Spatial Visualization task and an Abstract Reasoning task, at the beginning and the end of a semester, after having received training through the subjects "Technical Drawing I: Geometry and Perception" and "Projects I." The results of this group were compared with those of a control group of students enrolled in a Mathematics degree, who were also pre-post evaluated but had not received the training in Technical Drawing. The study showed a significant pre-post improvement in both, Visualization and reasoning. However, this improvement occurred in both groups, thereby concluding that this improvement was not due to indirect training. Furthermore, no significant differences were found between men and women in any of the groups or conditions. These results clarify those of an earlier study where improvement in Visualization after training in Technical Drawing was found but did not include a comparison with a control condition. The control condition has proved to be important in order to consider the limitations of the effect of Technical Drawing on said improvement.
NASA Astrophysics Data System (ADS)
York, Andrew M.
2000-11-01
The ever increasing sophistication of reconnaissance sensors reinforces the importance of timely, accurate, and equally sophisticated mission planning capabilities. Precision targeting and zero-tolerance for collateral damage and civilian casualties, stress the need for accuracy and timeliness. Recent events have highlighted the need for improvement in current planning procedures and systems. Annotating printed maps takes time and does not allow flexibility for rapid changes required in today's conflicts. We must give aircrew the ability to accurately navigate their aircraft to an area of interest, correctly position the sensor to obtain the required sensor coverage, adapt missions as required, and ensure mission success. The growth in automated mission planning system capability and the expansion of those systems to include dedicated and integrated reconnaissance modules, helps to overcome current limitations. Mission planning systems, coupled with extensive integrated visualization capabilities, allow aircrew to not only plan accurately and quickly, but know precisely when they will locate the target and visualize what the sensor will see during its operation. This paper will provide a broad overview of the current capabilities and describe how automated mission planning and visualization systems can improve and enhance the reconnaissance planning process and contribute to mission success. Think about the ultimate objective of the reconnaissance mission as we consider areas that technology can offer improvement. As we briefly review the fundamentals, remember where and how TAC RECCE systems will be used. Try to put yourself in the mindset of those who are on the front lines, working long hours at increasingly demanding tasks, trying to become familiar with new operating areas and equipment, while striving to minimize risk and optimize mission success. Technical advancements that can reduce the TAC RECCE timeline, simplify operations and instill Warfighter confidence, ultimately improve the desired outcome.
AHMCT Intelligent Roadway Information System (IRIS) technical support and testing
DOT National Transportation Integrated Search
2011-12-31
This report documents the research project AHMCT IRIS Technical Support and Testing, : performed under contract 65A0275, Task ID 1777. It presents an overview of the Intelligent : Roadway Information System (IRIS), and its design and function. ...
AHMCT Intelligent Roadway Information System (IRIS) technical support and testing.
DOT National Transportation Integrated Search
2011-12-01
This report documents the research project AHMCT IRIS Technical Support and Testing, : performed under contract 65A0275, Task ID 1777. It presents an overview of the Intelligent : Roadway Information System (IRIS), and its design and function. ...
Concept mapping: Impact on content and organization of technical writing in science
NASA Astrophysics Data System (ADS)
Conklin, Elaine
The purpose of this quasi-experimental study was to compare the relationship between concept mapping and the content and organization of technical writing of ninth grade biology students. All students in the study completed a prewriting assessment. The experimental group received concept map instruction while the control group performed alternate tasks. After instruction, both groups completed the postwriting assessment and mean differences were compared using the t statistic for independent measures. Additionally, scores on the concept map were correlated to the scores on the postwriting assessment using the Pearson correlation coefficient. Finally, attitudes toward using concept mapping as a prewriting strategy were analyzed using the t statistic for repeated measures. Concept mapping significantly improved the depth of content; however, no statistical significance was detected for organization. Students had a significantly positive change in attitude toward using concept mapping to plan a writing assessment, organize information, and think creatively. The findings indicated concept mapping had a positive effect on the students' abilities to select concepts appropriate to respond to a writing prompt, integrate facts into complete thoughts and ideas, and apply it in novel situations. Concept maps appeared to facilitate learning how to process information and transform it into expository writing. Sustained practice in designing concept maps may influence organization as well as content. Developing a systematic approach to synthesize well-organized and coherent arguments in response to a writing task is an invaluable communication skill that has implications for the learner across disciplines and prepares them for higher education and the workforce.
Hossain, Faisal; Arnold, Jeffrey; Beighley, Ed; Brown, Casey; Burian, Steve; Chen, Ji; Mitra, Anindita; Niyogi, Dev; Pielke, Roger; Tidwell, Vincent; Wegner, Dave
2015-01-01
This article represents the second report by an ASCE Task Committee "Infrastructure Impacts of Landscape-driven Weather Change" under the ASCE Watershed Management Technical Committee and the ASCE Hydroclimate Technical Committee. Herein, the 'infrastructure impacts" are referred to as infrastructure-sensitive changes in weather and climate patterns (extremes and non-extremes) that are modulated, among other factors, by changes in landscape, land use and land cover change. In this first report, the article argued for explicitly considering the well-established feedbacks triggered by infrastructure systems to the land-atmosphere system via landscape change. In this report by the ASCE Task Committee (TC), we present the results of this ASCE TC's survey of a cross section of experienced water managers using a set of carefully crafted questions. These questions covered water resources management, infrastructure resiliency and recommendations for inclusion in education and curriculum. We describe here the specifics of the survey and the results obtained in the form of statistical averages on the 'perception' of these managers. Finally, we discuss what these 'perception' averages may indicate to the ASCE TC and community as a whole for stewardship of the civil engineering profession. The survey and the responses gathered are not exhaustive nor do they represent the ASCE-endorsed viewpoint. However, the survey provides a critical first step to developing the framework of a research and education plan for ASCE. Given the Water Resources Reform and Development Act passed in 2014, we must now take into account the perceived concerns of the water management community.
Hossain, Faisal; Arnold, Jeffrey; Beighley, Ed; Brown, Casey; Burian, Steve; Chen, Ji; Mitra, Anindita; Niyogi, Dev; Pielke, Roger; Tidwell, Vincent; Wegner, Dave
2015-01-01
This article represents the second report by an ASCE Task Committee “Infrastructure Impacts of Landscape-driven Weather Change” under the ASCE Watershed Management Technical Committee and the ASCE Hydroclimate Technical Committee. Herein, the ‘infrastructure impacts” are referred to as infrastructure-sensitive changes in weather and climate patterns (extremes and non-extremes) that are modulated, among other factors, by changes in landscape, land use and land cover change. In this first report, the article argued for explicitly considering the well-established feedbacks triggered by infrastructure systems to the land-atmosphere system via landscape change. In this report by the ASCE Task Committee (TC), we present the results of this ASCE TC’s survey of a cross section of experienced water managers using a set of carefully crafted questions. These questions covered water resources management, infrastructure resiliency and recommendations for inclusion in education and curriculum. We describe here the specifics of the survey and the results obtained in the form of statistical averages on the ‘perception’ of these managers. Finally, we discuss what these ‘perception’ averages may indicate to the ASCE TC and community as a whole for stewardship of the civil engineering profession. The survey and the responses gathered are not exhaustive nor do they represent the ASCE-endorsed viewpoint. However, the survey provides a critical first step to developing the framework of a research and education plan for ASCE. Given the Water Resources Reform and Development Act passed in 2014, we must now take into account the perceived concerns of the water management community. PMID:26544045
Emerging Propulsion Technologies
NASA Technical Reports Server (NTRS)
Keys, Andrew S.
2006-01-01
The Emerging Propulsion Technologies (EPT) investment area is the newest area within the In-Space Propulsion Technology (ISPT) Project and strives to bridge technologies in the lower Technology Readiness Level (TRL) range (2 to 3) to the mid TRL range (4 to 6). A prioritization process, the Integrated In-Space Transportation Planning (IISTP), was developed and applied in FY01 to establish initial program priorities. The EPT investment area emerged for technologies that scored well in the IISTP but had a low technical maturity level. One particular technology, the Momentum-eXchange Electrodynamic-Reboost (MXER) tether, scored extraordinarily high and had broad applicability in the IISTP. However, its technical maturity was too low for ranking alongside technologies like the ion engine or aerocapture. Thus MXER tethers assumed top priority at EPT startup in FY03 with an aggressive schedule and adequate budget. It was originally envisioned that future technologies would enter the ISP portfolio through EPT, and EPT developed an EPT/ISP Entrance Process for future candidate ISP technologies. EPT has funded the following secondary, candidate ISP technologies at a low level: ultra-lightweight solar sails, general space/near-earth tether development, electrodynamic tether development, advanced electric propulsion, and in-space mechanism development. However, the scope of the ISPT program has focused over time to more closely match SMD needs and technology advancement successes. As a result, the funding for MXER and other EPT technologies is not currently available. Consequently, the MXER tether tasks and other EPT tasks were expected to phased out by November 2006. Presentation slides are presented which provide activity overviews for the aerocapture technology and emerging propulsion technology projects.
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
This Feasibility Analysis covers a wide range of studies and evaluations. The Report is divided into five parts. Section 1 contains all material relating to the Institutional Assessment including consideration of the requirements and position of the Potomac Electric Co. as they relate to cogeneration at Georgetown in parallel with the utility (Task 1). Sections 2 through 7 contain all technical information relating to the Alternative Subsystems Analysis (Task 4). This includes the energy demand profiles upon which the evaluations were based (Task 3). It further includes the results of the Life-Cycle-Cost Analyses (Task 5) which are developed in detailmore » in the Appendix for evaluation in the Technical Report. Also included is the material relating to Incremental Savings and Optimization (Task 6) and the Conceptual Design for candidate alternate subsystems (Task 7). Section 8 contains all material relating to the Environmental Impact Assessment (Task 2). The Appendix contains supplementary material including the budget cost estimates used in the life-cycle-cost analyses, the basic assumptions upon which the life-cycle analyses were developed, and the detailed life-cycle-cost anlysis for each subsystem considered in detail.« less
NASA Technical Reports Server (NTRS)
Wynne, Eleanor C.
1993-01-01
The purpose of this paper is to present the Structural Dynamics Division's research accomplishments for F.Y. 1992 and research plans for F.Y. 1993. The work under each Branch (technical area) is described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to 5-year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.
NASA Technical Reports Server (NTRS)
Dixon, S. C.; Gardner, James E.
1988-01-01
The purpose of this paper is to present the Loads and Aeroelasticity Division's research accomplishments for FY87 and research plans for FY88. The work under each Branch (technical area) is described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to five year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.
ERIC Educational Resources Information Center
Baker, William E.; And Others
The document is one of five summary reports, all part of a Pre-Technical Curriculum Planning Project for secondary students who aspire to technical employment or post secondary technical education. This report represents the results of an assessment of the northeast Florida area's technical occupations in engineering and industrial fields. A…
ERIC Educational Resources Information Center
Baker, William E.; And Others
The document is one of five summary reports, all part of a Pre-Technical Curriculum Planning Project for secondary students who aspire to technical employment or post secondary technical education. This report represents the results of an assessment of the northeast Florida area's technical occupations in agriculture and related businesses. A…
Health Related Occupations. Revised Summary Report: Technical Employment in Northeast Florida.
ERIC Educational Resources Information Center
Baker, William E.; And Others
The document is one of five summary reports, all part of a Pre-Technical Curriculum Planning Project for secondary students who aspire to technical employment or post secondary technical education. This report represents the results of an assessment of the northeast Florida area's technical occupations in health related occupations. A three-phase…
System design of the Pioneer Venus spacecraft. Volume 14: Test planning trades
NASA Technical Reports Server (NTRS)
Pedretti, C. D.
1973-01-01
Pioneer Venus system test plans and trade studies which were first published as Study Tasks (References 1 through 5) are reviewed. The plan and trade studies are presented in a condensed form. Greater detail may be found in the referenced study tasks if desired. All significant conclusions and plan outlines of the original studies are, presented.
Typical and Atypical (Cerebral Palsy) Development of Unimanual and Bimanual Grasp Planning
ERIC Educational Resources Information Center
Janssen, Loes; Steenbergen, Bert
2011-01-01
In the present study we tested 13 children with cerebral palsy (CP) and 24 typically developing children (7-12 years old) in a unimanual and bimanual motor planning task. We focused on two research questions: (1) How does motor planning develop in children with and without CP? and (2) Is motor planning facilitated when the task is performed with…
2008-07-28
continue to be beyond our technical ability to realize aggresively pursue advanced technical solutions to stay at the leading edge of technological...inherent to each caf Way and to seek continual improvement through exploration of innovative concepts, advanced capabilities, game -changing...available online at the air force portal: https://wwwd.my.af.mil/afknprod/strat_plan COMBAT AIR FORCE STRATEGIC PLAN Points of Contact securing the high
NASA Technical Reports Server (NTRS)
Gardner, J. E.; Dixon, S. C.
1985-01-01
The loads and aeroelasticity divisions research accomplishments are presented. The work under each branch or technical area, described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to 5 year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.
Code of Federal Regulations, 2013 CFR
2013-07-01
... PLANS (CONTINUED) Wisconsin § 52.2586 Small business stationary source technical and environmental compliance assistance program. The Wisconsin small business stationary source technical and environmental...
Code of Federal Regulations, 2010 CFR
2010-07-01
... PLANS (CONTINUED) Wisconsin § 52.2586 Small business stationary source technical and environmental compliance assistance program. The Wisconsin small business stationary source technical and environmental...
Code of Federal Regulations, 2014 CFR
2014-07-01
... PLANS (CONTINUED) Wisconsin § 52.2586 Small business stationary source technical and environmental compliance assistance program. The Wisconsin small business stationary source technical and environmental...