Sample records for technical team evaluates

  1. 75 FR 68606 - Chetco River Gravel Mining Executive and Technical Teams; Notification of Availability of Documents.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-08

    ... Executive and Technical Teams; Notification of Availability of Documents. AGENCY: U.S. Army Corps of... public all work products of the Chetco River Gravel Mining Executive and Technical Teams. These work... INFORMATION: The Executive and Technical Teams were established in 2007 as part of an initiative to evaluate...

  2. Multidisciplinary crisis simulations: the way forward for training surgical teams.

    PubMed

    Undre, Shabnam; Koutantji, Maria; Sevdalis, Nick; Gautama, Sanjay; Selvapatt, Nowlan; Williams, Samantha; Sains, Parvinderpal; McCulloch, Peter; Darzi, Ara; Vincent, Charles

    2007-09-01

    High-reliability organizations have stressed the importance of non-technical skills for safety and of regularly providing such training to their teams. Recently safety skills training has been applied in the practice of medicine. In this study, we developed and piloted a module using multidisciplinary crisis scenarios in a simulated operating theatre to train entire surgical teams. Twenty teams participated (n = 80); each consisted of a trainee surgeon, anesthetist, operating department practitioner (ODP), and scrub nurse. Crisis scenarios such as difficult intubation, hemorrhage, or cardiac arrest were simulated. Technical and non-technical skills (leadership, communication, team skills, decision making, and vigilance), were assessed by clinical experts and by two psychologists using relevant technical and human factors rating scales. Participants received technical and non-technical feedback, and the whole team received feedback on teamwork. Trainees assessed the training favorably. For technical skills there were no differences between surgical trainees' assessment scores and the assessment scores of the trainers. However, nurses overrated their technical skill. Regarding non-technical skills, leadership and decision making were scored lower than the other three non-technical skills (communication, team skills, and vigilance). Surgeons scored lower than nurses on communication and teamwork skills. Surgeons and anesthetists scored lower than nurses on leadership. Multidisciplinary simulation-based team training is feasible and well received by surgical teams. Non-technical skills can be assessed alongside technical skills, and differences in performance indicate where there is a need for further training. Future work should focus on developing team performance measures for training and on the development and evaluation of systematic training for technical and non-technical skills to enhance team performance and safety in surgery.

  3. Efficacy of simulation-based trauma team training of non-technical skills. A systematic review.

    PubMed

    Gjeraa, K; Møller, T P; Østergaard, D

    2014-08-01

    Trauma resuscitation is a complex situation, and most organisations have multi-professional trauma teams. Non-technical skills are challenged during trauma resuscitation, and they play an important role in the prevention of critical incidents. Simulation-based training of these is recommended. Our research question was: Does simulation-based trauma team training of non-technical skills have effect on reaction, learning, behaviour or patient outcome? The authors searched PubMed, EMBASE and the Cochrane Library and found 13 studies eligible for analysis. We described and compared the educational interventions and the evaluations of effect according to the four Kirkpatrick levels: reaction, learning (knowledge, skills, attitudes), behaviour (in a clinical setting) and patient outcome. No studies were randomised, controlled and blinded, resulting in a moderate to high risk of bias. The multi-professional trauma teams had positive reactions to simulation-based training of non-technical skills. Knowledge and skills improved in all studies evaluating the effect on learning. Three studies found improvements in team performance (behaviour) in the clinical setting. One of these found difficulties in maintaining these skills. Two studies evaluated on patient outcome, of which none showed improvements in mortality, complication rate or duration of hospitalisation. A significant effect on learning was found after simulation-based training of the multi-professional trauma team in non-technical skills. Three studies demonstrated significantly increased clinical team performance. No effect on patient outcome was found. All studies had a moderate to high risk of bias. More comprehensive randomised studies are needed to evaluate the effect on patient outcome. © 2014 The Acta Anaesthesiologica Scandinavica Foundation. Published by John Wiley & Sons Ltd.

  4. Team Training and Evaluation Strategies: A State-of-Art Review.

    ERIC Educational Resources Information Center

    Wagner, H.; And Others

    Educational Resources Information Center (ERIC), the Defense Documentation Center (DDC), National Technical Information Service (NTIS), Psychological Abstracts, HumRRO Library, and industrial training publications were surveyed to analyze instructional and evaluative techniques relevant to team training. Research studies and team training…

  5. Endoscopic non-technical skills team training: the next step in quality assurance of endoscopy training.

    PubMed

    Matharoo, Manmeet; Haycock, Adam; Sevdalis, Nick; Thomas-Gibson, Siwan

    2014-12-14

    To investigate whether novel, non-technical skills training for Bowel Cancer Screening (BCS) endoscopy teams enhanced patient safety knowledge and attitudes. A novel endoscopy team training intervention for BCS teams was developed and evaluated as a pre-post intervention study. Four multi-disciplinary BCS teams constituting BCS endoscopist(s), specialist screening practitioners, endoscopy nurses and administrative staff (A) from English BCS training centres participated. No patients were involved in this study. Expert multidisciplinary faculty delivered a single day's training utilising real clinical examples. Pre and post-course evaluation comprised participants' patient safety awareness, attitudes, and knowledge. Global course evaluations were also collected. Twenty-three participants attended and their patient safety knowledge improved significantly from 43%-55% (P ≤ 0.001) following the training intervention. 12/41 (29%) of the safety attitudes items significantly improved in the areas of perceived patient safety knowledge and awareness. The remaining safety attitude items: perceived influence on patient safety, attitudes towards error management, error management actions and personal views following an error were unchanged following training. Both qualitative and quantitative global course evaluations were positive: 21/23 (91%) participants strongly agreed/agreed that they were satisfied with the course. Qualitative evaluation included mandating such training for endoscopy teams outside BCS and incorporating team training within wider endoscopy training. Limitations of the study include no measure of increased patient safety in clinical practice following training. A novel comprehensive training package addressing patient safety, non-technical skills and adverse event analysis was successful in improving multi-disciplinary teams' knowledge and safety attitudes.

  6. Notification: Audit of Region 7’s Superfund Technical Assessment and Response Team (START) Contract

    EPA Pesticide Factsheets

    Project #OA-FY14-0354, July 21, 2014. The EPA OIG plans to begin the preliminary research phase of an audit evaluating Region 7's monitoring for compliance under its Superfund Technical Assessment and Response Team (START) contract (EPS71306).

  7. Patient-specific rehearsal prior to EVAR: a pilot study.

    PubMed

    Desender, L; Rancic, Z; Aggarwal, R; Duchateau, J; Glenck, M; Lachat, M; Vermassen, F; Van Herzeele, I

    2013-06-01

    This study aims to evaluate feasibility, face validity, influence on technical factors and subjective sense of utility of patient-specific rehearsal (PsR) prior to endovascular aortic aneurysm repair (EVAR). A prospective, multicentre pilot study. Patients suitable for EVAR were enrolled and a three-dimensional (3D) model of the patient's anatomy was generated. Less than 24 h prior to the real case, rehearsals were conducted in the laboratory or clinical angiosuite. Technical metrics were recorded during both procedures. A subjective questionnaire was used to evaluate realism, technical and human factor aspects (scale 1-5). Ten patients were enrolled. In one case, the treatment plan was altered based on PsR. In 7/9 patients, the rehearsal significantly altered the optimal C-arm position for the proximal landing zone and an identical fluoroscopy angle was chosen in the real procedure. All team members found the rehearsal useful for selecting the optimal fluoroscopy angle (median 4). The realism of the EVAR procedure simulation was rated highly (median 4). All team members found the PsR useful to prepare the individual team members and the entire team (median 4). PsR for EVAR permits creation of realistic case studies. Subjective evaluation indicates that it may influence optimal C-arm angles and be valuable to prepare the entire team. A randomised controlled trial (RCT) is planned to evaluate how this technology may influence technical and team performance, ultimately leading to improved patient safety. Copyright © 2013 European Society for Vascular Surgery. Published by Elsevier Ltd. All rights reserved.

  8. Electrification Futures Study: A Technical Evaluation of the Impacts of an

    Science.gov Websites

    Technical Evaluation of the Impacts of an Electrified U.S. Energy System Electrification Futures Study: A Technical Evaluation of the Impacts of an Electrified U.S. Energy System Illustration showing various impacts of widespread electrification in the United States. In addition to NREL, the research team

  9. Important Non-Technical Skills in Video-Assisted Thoracoscopic Surgery Lobectomy: Team Perspectives.

    PubMed

    Gjeraa, Kirsten; Mundt, Anna S; Spanager, Lene; Hansen, Henrik J; Konge, Lars; Petersen, René H; Østergaard, Doris

    2017-07-01

    Safety in the operating room is dependent on the team's non-technical skills. The importance of non-technical skills appears to be different for minimally invasive surgery as compared with open surgery. The aim of this study was to identify which non-technical skills are perceived by team members to be most important for patient safety, in the setting of video-assisted thoracoscopic surgery (VATS) lobectomy. This was an explorative, semistructured interview-based study with 21 participants from all four thoracic surgery centers in Denmark that perform VATS lobectomy. Data analysis was deductive, and directed content analysis was used to code the text into the Oxford Non-Technical Skills system for evaluating operating teams' non-technical skills. The most important non-technical skills described by the VATS teams were planning and preparation, situation awareness, problem solving, leadership, risk assessment, and teamwork. These non-technical skills enabled the team to achieve shared mental models, which in turn facilitated their efforts to anticipate next steps. This was viewed as important by the participants as they saw VATS lobectomy as a high-risk procedure with complementary and overlapping scopes of practice between surgical and anesthesia subteams. This study identified six non-technical skills that serve as the foundation for shared mental models of the patient, the current situation, and team resources. These findings contribute three important additions to the shared mental model construct: planning and preparation, risk assessment, and leadership. Shared mental models are crucial for patient safety because they enable VATS teams to anticipate problems through adaptive patterns of both implicit and explicit coordination. Copyright © 2017 The Society of Thoracic Surgeons. Published by Elsevier Inc. All rights reserved.

  10. 23 CFR 636.305 - Can price information be provided to analysts who are reviewing technical proposals?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS DESIGN-BUILD CONTRACTING Proposal Evaluation...? Normally, technical and price proposals are reviewed independently by separate evaluation teams. However...

  11. 23 CFR 636.305 - Can price information be provided to analysts who are reviewing technical proposals?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS DESIGN-BUILD CONTRACTING Proposal Evaluation...? Normally, technical and price proposals are reviewed independently by separate evaluation teams. However...

  12. 23 CFR 636.305 - Can price information be provided to analysts who are reviewing technical proposals?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS DESIGN-BUILD CONTRACTING Proposal Evaluation...? Normally, technical and price proposals are reviewed independently by separate evaluation teams. However...

  13. 23 CFR 636.305 - Can price information be provided to analysts who are reviewing technical proposals?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS DESIGN-BUILD CONTRACTING Proposal Evaluation...? Normally, technical and price proposals are reviewed independently by separate evaluation teams. However...

  14. 23 CFR 636.305 - Can price information be provided to analysts who are reviewing technical proposals?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS DESIGN-BUILD CONTRACTING Proposal Evaluation...? Normally, technical and price proposals are reviewed independently by separate evaluation teams. However...

  15. Endoscopic non-technical skills team training: The next step in quality assurance of endoscopy training

    PubMed Central

    Matharoo, Manmeet; Haycock, Adam; Sevdalis, Nick; Thomas-Gibson, Siwan

    2014-01-01

    AIM: To investigate whether novel, non-technical skills training for Bowel Cancer Screening (BCS) endoscopy teams enhanced patient safety knowledge and attitudes. METHODS: A novel endoscopy team training intervention for BCS teams was developed and evaluated as a pre-post intervention study. Four multi-disciplinary BCS teams constituting BCS endoscopist(s), specialist screening practitioners, endoscopy nurses and administrative staff (A) from English BCS training centres participated. No patients were involved in this study. Expert multidisciplinary faculty delivered a single day’s training utilising real clinical examples. Pre and post-course evaluation comprised participants’ patient safety awareness, attitudes, and knowledge. Global course evaluations were also collected. RESULTS: Twenty-three participants attended and their patient safety knowledge improved significantly from 43%-55% (P ≤ 0.001) following the training intervention. 12/41 (29%) of the safety attitudes items significantly improved in the areas of perceived patient safety knowledge and awareness. The remaining safety attitude items: perceived influence on patient safety, attitudes towards error management, error management actions and personal views following an error were unchanged following training. Both qualitative and quantitative global course evaluations were positive: 21/23 (91%) participants strongly agreed/agreed that they were satisfied with the course. Qualitative evaluation included mandating such training for endoscopy teams outside BCS and incorporating team training within wider endoscopy training. Limitations of the study include no measure of increased patient safety in clinical practice following training. CONCLUSION: A novel comprehensive training package addressing patient safety, non-technical skills and adverse event analysis was successful in improving multi-disciplinary teams’ knowledge and safety attitudes. PMID:25516665

  16. A Human Factors Analysis of Technical and Team Skills Among Surgical Trainees During Procedural Simulations in a Simulated Operating Theatre

    PubMed Central

    Moorthy, Krishna; Munz, Yaron; Adams, Sally; Pandey, Vikas; Darzi, Ara

    2005-01-01

    Background: High-risk organizations such as aviation rely on simulations for the training and assessment of technical and team performance. The aim of this study was to develop a simulated environment for surgical trainees using similar principles. Methods: A total of 27 surgical trainees carried out a simulated procedure in a Simulated Operating Theatre with a standardized OR team. Observation of OR events was carried out by an unobtrusive data collection system: clinical data recorder. Assessment of performance consisted of blinded rating of technical skills, a checklist of technical events, an assessment of communication, and a global rating of team skills by a human factors expert and trained surgical research fellows. The participants underwent a debriefing session, and the face validity of the simulated environment was evaluated. Results: While technical skills rating discriminated between surgeons according to experience (P = 0.002), there were no differences in terms of the checklist and team skills (P = 0.70). While all trainees were observed to gown/glove and handle sharps correctly, low scores were observed for some key features of communication with other team members. Low scores were obtained by the entire cohort for vigilance. Interobserver reliability was 0.90 and 0.89 for technical and team skills ratings. Conclusions: The simulated operating theatre could serve as an environment for the development of surgical competence among surgical trainees. Objective, structured, and multimodal assessment of performance during simulated procedures could serve as a basis for focused feedback during training of technical and team skills. PMID:16244534

  17. Randomized controlled trial of multidisciplinary team stress and performance in immersive simulation for management of infant in shock: study protocol.

    PubMed

    Ghazali, Daniel Aiham; Ragot, Stéphanie; Breque, Cyril; Guechi, Youcef; Boureau-Voultoury, Amélie; Petitpas, Franck; Oriot, Denis

    2016-03-25

    Human error and system failures continue to play a substantial role in adverse outcomes in healthcare. Simulation improves management of patients in critical condition, especially if it is undertaken by a multidisciplinary team. It covers technical skills (technical and therapeutic procedures) and non-technical skills, known as Crisis Resource Management. The relationship between stress and performance is theoretically described by the Yerkes-Dodson law as an inverted U-shaped curve. Performance is very low for a low level of stress and increases with an increased level of stress, up to a point, after which performance decreases and becomes severely impaired. The objectives of this randomized trial are to study the effect of stress on performance and the effect of repeated simulation sessions on performance and stress. This study is a single-center, investigator-initiated randomized controlled trial including 48 participants distributed in 12 multidisciplinary teams. Each team is made up of 4 persons: an emergency physician, a resident, a nurse, and an ambulance driver who usually constitute a French Emergency Medical Service team. Six multidisciplinary teams are planning to undergo 9 simulation sessions over 1 year (experimental group), and 6 multidisciplinary teams are planning to undergo 3 simulation sessions over 1 year (control group). Evidence of the existence of stress will be assessed according to 3 criteria: biological, electrophysiological, and psychological stress. The impact of stress on overall team performance, technical procedure and teamwork will be evaluated. Participant self-assessment of the perceived impact of simulations on clinical practice will be collected. Detection of post-traumatic stress disorder will be performed by self-assessment questionnaire on the 7(th) day and after 1 month. We will concomitantly evaluate technical and non-technical performance, and the impact of stress on both. This is the first randomized trial studying repetition of simulation sessions and its impact on both clinical performance and stress, which is explored by objective and subjective assessments. We expect that stress decreases team performance and that repeated simulation will increase it. We expect no variation of stress parameters regardless of the level of performance. ClinicalTrials.gov registration number NCT02424890.

  18. Evaluating multidisciplinary health care teams: taking the crisis out of CRM.

    PubMed

    Sutton, Gigi

    2009-08-01

    High-reliability organisations are those, such as within the aviation industry, which operate in complex, hazardous environments and yet despite this are able to balance safety and effectiveness. Crew resource management (CRM) training is used to improve the non-technical skills of aviation crews and other high-reliability teams. To date, CRM within the health sector has been restricted to use with "crisis teams" and "crisis events". The purpose of this discussion paper is to examine the application of CRM to acute, ward-based multidisciplinary health care teams and more broadly to argue for the repositioning of health-based CRM to address effective everyday function, of which "crisis events" form just one part. It is argued that CRM methodology could be applied to evaluate ward-based health care teams and design non-technical skills training to increase their efficacy, promote better patient outcomes, and facilitate a range of positive personal and organisational level outcomes.

  19. Mental Preparation and Evaluation: A Sportpsychological Project with the Swiss Orienteering National Team.

    ERIC Educational Resources Information Center

    Venzl, Reto

    1994-01-01

    Lists the training themes and levels of intervention of a psychological orienteering project for Swiss athletes. Presents an outline for preparation and evaluation of team or individual performance over time on technical, physical, mental, and environmental aspects of orienteering. (SV)

  20. Pregnancy and You. Courseware Evaluation for Vocational and Technical Education.

    ERIC Educational Resources Information Center

    Sarle, Ruth; And Others

    This courseware evaluation rates the "Pregnancy and You" program, developed by Intellectual Software and sold by Career Aids, Inc. The courseware was rated by a team of home economists participating in a network designed to identify and evaluate courseware and disseminate reviews for vocational and technical teachers, media staff, and…

  1. Simulation-based team training improved the self-assessed ability of physicians, nurses and midwives to perform neonatal resuscitation.

    PubMed

    Malmström, B; Nohlert, E; Ewald, U; Widarsson, M

    2017-08-01

    The use of simulation-based team training in neonatal resuscitation has increased in Sweden during the last decade, but no formal evaluation of this training method has been performed. This study evaluated the effect of simulation-based team training on the self-assessed ability of personnel to perform neonatal resuscitation. We evaluated a full-day simulation-based team training course in neonatal resuscitation, by administering a questionnaire to 110 physicians, nurses and midwives before and after the training period. The questionnaire focused on four important domains: communication, leadership, confidence and technical skills. The study was carried out in Sweden from 2005 to 2007. The response rate was 84%. Improvements in the participants' self-assessed ability to perform neonatal resuscitation were seen in all four domains after training (p < 0.001). Professionally inexperienced personnel showed a significant improvement in the technical skills domain compared to experienced personnel (p = 0.001). No differences were seen between professions or time since training in any of the four domains. Personnel with less previous experience with neonatal resuscitation showed improved confidence (p = 0.007) and technical skills (p = 0.003). A full-day course on simulation-based team training with video-supported debriefing improved the participants' self-assessed ability to perform neonatal resuscitation. ©2017 Foundation Acta Paediatrica. Published by John Wiley & Sons Ltd.

  2. Oxford NOTECHS II: a modified theatre team non-technical skills scoring system.

    PubMed

    Robertson, Eleanor R; Hadi, Mohammed; Morgan, Lauren J; Pickering, Sharon P; Collins, Gary; New, Steve; Griffin, Damian; Griffin, Damien; McCulloch, Peter; Catchpole, Ken C

    2014-01-01

    We previously developed and validated the Oxford NOTECHS rating system for evaluating the non-technical skills of an entire operating theatre team. Experience with the scale identified the need for greater discrimination between levels of performance within the normal range. We report here the development of a modified scale (Oxford NOTECHS II) to facilitate this. The new measure uses an eight-point instead of a four point scale to measure each dimension of non-technical skills, and begins with a default rating of 6 for each element. We evaluated this new scale in 297 operations at five NHS sites in four surgical specialities. Measures of theatre process reliability (glitch count) and compliance with the WHO surgical safety checklist were scored contemporaneously, and relationships with NOTECHS II scores explored. Mean team Oxford NOTECHS II scores was 73.39 (range 37-92). The means for surgical, anaesthetic and nursing sub-teams were 24.61 (IQR 23, 27); 24.22 (IQR 23, 26) and 24.55 (IQR 23, 26). Oxford NOTECHS II showed good inter-rater reliability between human factors and clinical observers in each of the four domains. Teams with high WHO compliance had higher mean Oxford NOTECHS II scores (74.5) than those with low compliance (71.1) (p = 0.010). We observed only a weak correlation between Oxford NOTECHS II scores and glitch count; r = -0.26 (95% CI -0.36 to -0.15). Oxford NOTECHS II scores did not vary significantly between 5 different hospital sites, but a significant difference was seen between specialities (p = 0.001). Oxford NOTECHS II provides good discrimination between teams while retaining reliability and correlation with other measures of teamwork performance, and is not confounded by technical performance. It is therefore suitable for combined use with a technical performance scale to provide a global description of operating theatre team performance.

  3. The role of nontechnical skills in simulated trauma resuscitation.

    PubMed

    Briggs, Alexandra; Raja, Ali S; Joyce, Maurice F; Yule, Steven J; Jiang, Wei; Lipsitz, Stuart R; Havens, Joaquim M

    2015-01-01

    Trauma team training provides instruction on crisis management through debriefing and discussion of teamwork and leadership skills during simulated trauma scenarios. The effects of team leader's nontechnical skills (NTSs) on technical performance have not been thoroughly studied. We hypothesized that team's and team leader's NTSs correlate with technical performance of clinical tasks. Retrospective cohort study. Brigham and Women's Hospital, STRATUS Center for Surgical Simulation A total of 20 teams composed of surgical residents, emergency medicine residents, emergency department nurses, and emergency services assistants underwent 2 separate, high-fidelity, simulated trauma scenarios. Each trauma scenario was recorded on video for analysis and divided into 4 consecutive sections. For each section, 2 raters used the Non-Technical Skills for Surgeons framework to assess NTSs of the team. To evaluate the entire team's NTS, 2 additional raters used the Modified Non-Technical Skills Scale for Trauma system. Clinical performance measures including adherence to guidelines and time to perform critical tasks were measured independently. NTSs performance by both teams and team leaders in all NTS categories decreased from the beginning to the end of the scenario (all p < 0.05). There was significant correlation between team's and team leader's cognitive skills and critical task performance, with correlation coefficients between 0.351 and 0.478 (p < 0.05). The NTS performance of the team leader highly correlated with that of the entire team, with correlation coefficients between 0.602 and 0.785 (p < 0.001). The NTSs of trauma teams and team leaders deteriorate as clinical scenarios progress, and the performance of team leaders and teams is highly correlated. Cognitive NTS scores correlate with critical task performance. Increased attention to NTSs during trauma team training may lead to sustained performance throughout trauma scenarios. Decision making and situation awareness skills are critical for both team leaders and teams and should be specifically addressed to improve performance. Copyright © 2015 Association of Program Directors in Surgery. Published by Elsevier Inc. All rights reserved.

  4. Evaluation of simparteam - a needs-orientated team training format for obstetrics and neonatology.

    PubMed

    Zech, Alexandra; Gross, Benedict; Jasper-Birzele, Céline; Jeschke, Katharina; Kieber, Thomas; Lauterberg, Jörg; Lazarovici, Marc; Prückner, Stephan; Rall, Marcus; Reddersen, Silke; Sandmeyer, Benedikt; Scholz, Christoph; Stricker, Eric; Urban, Bert; Zobel, Astrid; Singer, Ingeborg

    2017-04-01

    A standardized team-training program for healthcare professionals in obstetric units was developed based on an analysis of common causes for adverse events found in claims registries. The interdisciplinary and inter-professional training concept included both technical and non-technical skill training. Evaluation of the program was carried out in hospitals with respect to the immediate personal learning of participants and also regarding changes in safety culture. Trainings in n=7 hospitals including n=270 participants was evaluated using questionnaires. These were administered at four points in time to staff from participating obstetric units: (1) 10 days ahead of the training (n=308), (2) on training day before (n=239), (3) right after training (n=248), and (4) 6 months after (n=188) the intervention. Questionnaires included several questions for technical and non-technical skills and the Hospital Survey on Patient Safety (HSOPS). Strong effects were found in the participants' perception of their own competence regarding technical skills and handling of emergencies. Small effects could be observed in the scales of the HSOPS questionnaire. Most effects differed depending on professional groups and hospitals. Integrated technical and team management training can raise employees' confidence with complex emergency management skills and processes. Some indications for improvements on the patient safety culture level were detected. Furthermore, differences between professional groups and hospitals were found, indicating the need for more research on contributing factors for patient safety and for the success of crew resource management (CRM) trainings.

  5. Rating teams' non-technical skills in the emergency department: A qualitative study of nurses' experience.

    PubMed

    Porter, Joanne E; Cant, Robyn P; Cooper, Simon J

    2018-05-01

    Non-technical skills (NTS) teamwork training can enhance clinicians' understanding of roles and improve communication. We evaluated a quality improvement project rating teams' NTS performance to determine the value of formal rating and debriefing processes. In two Australian emergency departments the NTS of resuscitation teams were rated by senior nurses and medical staff. Key measures were leadership, teamwork, and task management using a valid instrument: Team Emergency Assessment Measure (TEAM™). Emergency nurses were asked to attend a focus group from which key themes around the quality improvement process were identified. Main themes were: 'Team composition' (allocation of resuscitation team roles), 'Resuscitation leadership' (including both nursing and medical leadership roles) and 'TEAM™ ratings promote reflective practice' (providing staff a platform to discuss team effectiveness). Objective ratings were seen as enabling staff to provide feedback to other team members. Reflection on practice and debriefing were thought to improve communication, help define roles and responsibilities, and clarify leadership roles. Use of a non-technical skills rating scheme such as TEAM™ after team-based clinical resuscitation events was seen by emergency department nurses as feasible and a useful process for examining and improving multi-disciplinary practice, while improving team performance. Copyright © 2018 Elsevier Ltd. All rights reserved.

  6. INDEPENDENT REVIEW OF THE X-701B GROUNDWATER REMEDY, PORTSMOUTH, OHIO: TECHNICAL EVALUATION AND RECOMMENDATIONS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Looney, B.; Eddy-Dilek, C.; Costanza, J.

    2008-12-15

    The Department of Energy Portsmouth Paducah Project Office requested assistance from Department of Energy Office of Environmental Management (EM-22) to provide independent technical experts to evaluate past and ongoing remedial activities at the Portsmouth facility that were completed to address TCE contamination associated with the X-701B groundwater plume and to make recommendations for future efforts. The Independent Technical Review team was provided with a detailed and specific charter. The charter requested that the technical team first review the past and current activities completed for the X-701B groundwater remedy for trichloroethene (TCE) in accordance with a Decision Document that was issuedmore » by Ohio EPA on December 8, 2003 and a Work Plan that was approved by Ohio EPA on September 22, 2006. The remedy for X-701B divides the activities into four phases: Phase I - Initial Source Area Treatment, Phase II - Expanded Source Area Treatment, Phase III - Evaluation and Reporting, and Phase IV - Downgradient Remediation and Confirmation of Source Area Treatment. Phase I of the remedy was completed during FY2006, and DOE has now completed six oxidant injection events within Phase II. The Independent Technical Review team was asked to evaluate Phase II activities, including soil and groundwater results, and to determine whether or not the criteria that were defined in the Work Plan for the Phase II end point had been met. The following criteria are defined in the Work Plan as an acceptable Phase II end point: (1) Groundwater samples from the identified source area monitoring wells have concentrations below the Preliminary Remediation Goal (PRG) for TCE in groundwater, or (2) The remedy is no longer effective in removing TCE mass from the source area. In addition, the charter specifies that if the Review Team determines that the Phase II endpoint has not been reached, then the team should address the following issues: (1) If additional injection events are recommended, the team should identify the type of injection and target soil horizon for these injections; (2) Consider the feasibility of declaring Technical Impracticability and proceeding with the RCRA Cap for the X-701B; and (3) Provide a summary of other cost-effective technologies that could be implemented (especially for the lower Gallia). The Independent Technical Review team focused its evaluation solely on the X-701B source zone and contaminant plume. It did not review current or planned remedial activities at other plumes, waste areas, or landfills at the Portsmouth site, nor did it attempt to integrate such activities into its recommendations for X-701B. However, the ultimate selection of a remedy for X-701B by site personnel and regulators should take into account potentially synergistic efforts at other waste areas. Assessment of remedial alternatives in the context of site-wide management practices may reveal opportunities for leveraging and savings that would not otherwise be identified. For example, the cost of source-zone excavation or construction of a permeable reactive barrier at X-701B might be substantially reduced if contaminated soil could be buried on site at an existing or planned landfill. This allowance would improve the feasibility and competitiveness of both remedies. A comprehensive examination of ongoing and future environmental activities across the Portsmouth Gaseous Diffusion Plant is necessary to optimize the selection and timing of X-701B remediation with respect to cleanup efficiency, safety, and economics. A selected group of technical experts attended the technical workshop at the Portsmouth Gaseous Diffusion Plant from November 18 through 21, 2008. During the first day of the workshop, both contractor and DOE site personnel briefed the workshop participants and took them on a tour of the X-701B site. The initial briefing was attended by representatives of Ohio EPA who participated in the discussions. On subsequent days, the team reviewed baseline data and reports, were provided additional technical information from site personnel, evaluated work plans, determined critical issues and uncertainties, and recommended alternatives. This report documents the findings and recommendations of the independent technical review team.« less

  7. Summary of Tiger Team Assessment and Technical Safety Appraisal recurring concerns in the Maintenance Area

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-01-01

    Tiger Team Assessments and Technical Safety Appraisals (TSA) were reviewed and evaluated for concerns in the Maintenance Area (MA). Two hundred and thirty one (231) maintenance concerns were identified by the Tiger Team Assessments and TSA reports. These recurring concerns appear below. A summary of the Noteworthy Practices that were identified and a compilation of the maintenance concerns for each performance objective that were not considered as recurring are also included. Where the Tiger Team Assessment and TSA identified the operating contractor or facility by name, the concern has been modified to remove the name while retaining the intent ofmore » the comment.« less

  8. National Evaluation Program. Issues in Team Policing: A Review of the Literature.

    ERIC Educational Resources Information Center

    Gay, William G.; And Others

    This report presents the results of a literature survey on team policing, based on references currently available and accessible through the National Criminal Justice Reference Service, the National Technical Information Service, and commercial publishers. (In team policing a group of officers under common supervision are responsible for all…

  9. Solar Technical Assistance Team Webinars | State, Local, and Tribal

    Science.gov Websites

    Governments | NREL Solar Technical Assistance Team Webinars Solar Technical Assistance Team Webinars NREL's Solar Technical Assistance Team (STAT), with support from the U.S. Department of Energy

  10. Evaluation of the Hanford 200 West Groundwater Treatment System: Fluidized Bed Bioreactor

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Looney, Brian B.; Jackson, Dennis G.; Dickson, John O.

    A fluidized bed reactor (FBR) in the 200W water treatment facility at Hanford is removing nitrate from groundwater as part of the overall pump-treat-reinject process. Control of the FBR bed solids has proven challenging, impacting equipment, increasing operations and maintenance (O&M), and limiting the throughput of the facility. In response to the operational challenges, the Department of Energy Richland Office (DOE-RL) commissioned a technical assistance team to facilitate a system engineering evaluation and provide focused support recommendations to the Hanford Team. The DOE Environmental Management (EM) technical assistance process is structured to identify and triage technologies and strategies that addressmore » the target problem(s). The process encourages brainstorming and dialog and allows rapid identification and prioritization of possible options. Recognizing that continuous operation of a large-scale FBR is complex, requiring careful attention to system monitoring data and changing conditions, the technical assistance process focused on explicit identification of the available control parameters (“knobs”), how these parameters interact and impact the FBR system, and how these can be adjusted under different scenarios to achieve operational goals. The technical assistance triage process was performed in collaboration with the Hanford team.« less

  11. Trauma Non-Technical Training (TNT-2): the development, piloting and multilevel assessment of a simulation-based, interprofessional curriculum for team-based trauma resuscitation.

    PubMed

    Doumouras, Aristithes G; Keshet, Itay; Nathens, Avery B; Ahmed, Najma; Hicks, Christopher M

    2014-10-01

    Medical error is common during trauma resuscitations. Most errors are nontechnical, stemming from ineffective team leadership, nonstandardized communication among team members, lack of global situational awareness, poor use of resources and inappropriate triage and prioritization. We developed an interprofessional, simulation-based trauma team training curriculum for Canadian surgical trainees. Here we discuss its piloting and evaluation.

  12. Organising, Providing and Evaluating Technical Training for Early Career Researchers: A Case Study

    ERIC Educational Resources Information Center

    van Besouw, Rachel M.; Rogers, Katrine S.; Powles, Christopher J.; Papadopoulos, Timos; Ku, Emery M.

    2013-01-01

    This paper considers the importance of providing technical training opportunities for Early Career Researchers (ECRs) worldwide through the case study of a MATLAB training programme, which was proposed, organised, managed and evaluated by a team of five ECRs at the University of Southampton. The effectiveness of the programme in terms of the…

  13. [Team training and assessment in mixed reality-based simulated operating room : Current state of research in the field of simulation in spine surgery exemplified by the ATMEOS project].

    PubMed

    Stefan, P; Pfandler, M; Wucherer, P; Habert, S; Fürmetz, J; Weidert, S; Euler, E; Eck, U; Lazarovici, M; Weigl, M; Navab, N

    2018-04-01

    Surgical simulators are being increasingly used as an attractive alternative to clinical training in addition to conventional animal models and human specimens. Typically, surgical simulation technology is designed for the purpose of teaching technical surgical skills (so-called task trainers). Simulator training in surgery is therefore in general limited to the individual training of the surgeon and disregards the participation of the rest of the surgical team. The objective of the project Assessment and Training of Medical Experts based on Objective Standards (ATMEOS) is to develop an immersive simulated operating room environment that enables the training and assessment of multidisciplinary surgical teams under various conditions. Using a mixed reality approach, a synthetic patient model, real surgical instruments and radiation-free virtual X‑ray imaging are combined into a simulation of spinal surgery. In previous research studies, the concept was evaluated in terms of realism, plausibility and immersiveness. In the current research, assessment measurements for technical and non-technical skills are developed and evaluated. The aim is to observe multidisciplinary surgical teams in the simulated operating room during minimally invasive spinal surgery and objectively assess the performance of the individual team members and the entire team. Moreover, the effectiveness of training methods and surgical techniques or success critical factors, e. g. management of crisis situations, can be captured and objectively assessed in the controlled environment.

  14. Report of the Peer Review Panel on the early site suitability evaluation of the Potential Repository Site at Yucca Mountain, Nevada; Yucca Mountain Site Characterization Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1992-01-01

    The US Department of Energy (DOE) Yucca mountain Site Characterization Project Office (YMPO) assigned Science Applications International Corporation (SAIC), the Technical and Management Support Services (T&MSS) contractor to the YmPo, the task of conducting an Early Site Suitability Evaluation (ESSE) of the Yucca mountain site as a potential site for a high-level radioactive waste repository. First, the assignment called for the development of a method to evaluate a single site against the DOE General Guidelines for Recommendation of Sites for Nuclear Waste Repositories, 10 CFR Part 960. Then, using this method, an evaluation team, the ESSE Core Team, of seniormore » YMP scientists, engineers, and technical experts, evaluated new information obtained about the site since publication of the final Environmental Assessment (DOE, 1986) to determine if new suitability/unsuitability findings could be recommended. Finally, the Core Team identified further information and analyses needed to make final determinations for each of the guidelines. As part of the task, an independent peer review of the ESSE report has been conducted. Expertise was solicited that covered the entire spectrum of siting guidelines in 10 CFR Part 960 in order to provide a complete, in-depth critical review of the data evaluated and cited in the ESSE report, the methods used to evaluate the data, and the conclusions and recommendations offered by the report. Fourteen nationally recognized technical experts (Table 2) served on the Peer Review Panel. The comments from the Panel and the responses prepared by the ESSE Core Team, documented on formal Comment Response Forms, constitute the body of this document.« less

  15. Effect of obstetric team training on team performance and medical technical skills: a randomised controlled trial.

    PubMed

    Fransen, A F; van de Ven, J; Merién, A E R; de Wit-Zuurendonk, L D; Houterman, S; Mol, B W; Oei, S G

    2012-10-01

    To determine whether obstetric team training in a medical simulation centre improves the team performance and utilisation of appropriate medical technical skills of healthcare professionals. Cluster randomised controlled trial. The Netherlands. The obstetric departments of 24 Dutch hospitals. The obstetric departments were randomly assigned to a 1-day session of multiprofessional team training in a medical simulation centre or to no such training. Team training was given with high-fidelity mannequins by an obstetrician and a communication expert. More than 6 months following training, two unannounced simulated scenarios were carried out in the delivery rooms of all 24 obstetric departments. The scenarios, comprising a case of shoulder dystocia and a case of amniotic fluid embolism, were videotaped. The team performance and utilisation of appropriate medical skills were evaluated by two independent experts. Team performance evaluated with the validated Clinical Teamwork Scale (CTS) and the employment of two specific obstetric procedures for the two clinical scenarios in the simulation (delivery of the baby with shoulder dystocia in the maternal all-fours position and conducting a perimortem caesarean section within 5 minutes for the scenario of amniotic fluid embolism). Seventy-four obstetric teams from 12 hospitals in the intervention group underwent teamwork training between November 2009 and July 2010. The teamwork performance in the training group was significantly better in comparison to the nontraining group (median CTS score: 7.5 versus 6.0, respectively; P = 0.014). The use of the predefined obstetric procedures for the two clinical scenarios was also significantly more frequent in the training group compared with the nontraining group (83 versus 46%, respectively; P = 0.009). Team performance and medical technical skills may be significantly improved after multiprofessional obstetric team training in a medical simulation centre. © 2012 The Authors BJOG An International Journal of Obstetrics and Gynaecology © 2012 RCOG.

  16. Solar Technical Assistance Team Success Stories Video - Text Version |

    Science.gov Websites

    State, Local, and Tribal Governments | NREL Solar Technical Assistance Team Success Stories Video - Text Version Solar Technical Assistance Team Success Stories Video - Text Version Below is the text version for the Solar Technical Assistance Team Success Stories video. My name is Christopher

  17. Integrating Space Flight Resource Management Skills into Technical Lessons for International Space Station Flight Controller Training

    NASA Technical Reports Server (NTRS)

    Baldwin, Evelyn

    2008-01-01

    The Johnson Space Center s (JSC) International Space Station (ISS) Space Flight Resource Management (SFRM) training program is designed to teach the team skills required to be an effective flight controller. It was adapted from the SFRM training given to Shuttle flight controllers to fit the needs of a "24 hours a day/365 days a year" flight controller. More recently, the length reduction of technical training flows for ISS flight controllers impacted the number of opportunities for fully integrated team scenario based training, where most SFRM training occurred. Thus, the ISS SFRM training program is evolving yet again, using a new approach of teaching and evaluating SFRM alongside of technical materials. Because there are very few models in other industries that have successfully tied team and technical skills together, challenges are arising. Despite this, the Mission Operations Directorate of NASA s JSC is committed to implementing this integrated training approach because of the anticipated benefits.

  18. Expanded Guidance for NASA Systems Engineering. Volume 2: Crosscutting Topics, Special Topics, and Appendices

    NASA Technical Reports Server (NTRS)

    Hirshorn, Steven R.

    2017-01-01

    Historically, most successful NASA projects have depended on effectively blending project management, systems engineering, and technical expertise among NASA, contractors, and third parties. Underlying these successes are a variety of agreements (e.g., contract, memorandum of understanding, grant, cooperative agreement) between NASA organizations or between NASA and other Government agencies, Government organizations, companies, universities, research laboratories, and so on. To simplify the discussions, the term "contract" is used to encompass these agreements. This section focuses on the NASA systems engineering activities pertinent to awarding a contract, managing contract performance, and completing a contract. In particular, NASA systems engineering interfaces to the procurement process are covered, since the NASA engineering technical team plays a key role in the development and evaluation of contract documentation. Contractors and third parties perform activities that supplement (or substitute for) the NASA project technical team accomplishment of the NASA common systems engineering technical process activities and requirements outlined in this guide. Since contractors might be involved in any part of the systems engineering life cycle, the NASA project technical team needs to know how to prepare for, allocate or perform, and implement surveillance of technical activities that are allocated to contractors.

  19. NASA Space Environments Technical Discipline Team Space Weather Activities

    NASA Astrophysics Data System (ADS)

    Minow, J. I.; Nicholas, A. C.; Parker, L. N.; Xapsos, M.; Walker, P. W.; Stauffer, C.

    2017-12-01

    The Space Environment Technical Discipline Team (TDT) is a technical organization led by NASA's Technical Fellow for Space Environments that supports NASA's Office of the Chief Engineer through the NASA Engineering and Safety Center. The Space Environments TDT conducts independent technical assessments related to the space environment and space weather impacts on spacecraft for NASA programs and provides technical expertise to NASA management and programs where required. This presentation will highlight the status of applied space weather activities within the Space Environment TDT that support development of operational space weather applications and a better understanding of the impacts of space weather on space systems. We will first discuss a tool that has been developed for evaluating space weather launch constraints that are used to protect launch vehicles from hazardous space weather. We then describe an effort to better characterize three-dimensional radiation transport for CubeSat spacecraft and processing of micro-dosimeter data from the International Space Station which the team plans to make available to the space science community. Finally, we will conclude with a quick description of an effort to maintain access to the real-time solar wind data provided by the Advanced Composition Explorer satellite at the Sun-Earth L1 point.

  20. High fidelity simulation based team training in urology: a preliminary interdisciplinary study of technical and nontechnical skills in laparoscopic complications management.

    PubMed

    Lee, Jason Y; Mucksavage, Phillip; Canales, Cecilia; McDougall, Elspeth M; Lin, Sharon

    2012-04-01

    Simulation based team training provides an opportunity to develop interdisciplinary communication skills and address potential medical errors in a high fidelity, low stakes environment. We evaluated the implementation of a novel simulation based team training scenario and assessed the technical and nontechnical performance of urology and anesthesiology residents. Urology residents were randomly paired with anesthesiology residents to participate in a simulation based team training scenario involving the management of 2 scripted critical events during laparoscopic radical nephrectomy, including the vasovagal response to pneumoperitoneum and renal vein injury during hilar dissection. A novel kidney surgical model and a high fidelity mannequin simulator were used for the simulation. A debriefing session followed each simulation based team training scenario. Assessments of technical and nontechnical performance were made using task specific checklists and global rating scales. A total of 16 residents participated, of whom 94% rated the simulation based team training scenario as useful for communication skill training. Also, 88% of urology residents believed that the kidney surgical model was useful for technical skill training. Urology resident training level correlated with technical performance (p=0.004) and blood loss during renal vein injury management (p=0.022) but not with nontechnical performance. Anesthesia resident training level correlated with nontechnical performance (p=0.036). Urology residents consistently rated themselves higher on nontechnical performance than did faculty (p=0.033). Anesthesia residents did not differ in the self-assessment of nontechnical performance compared to faculty assessments. Residents rated the simulation based team training scenario as useful for interdisciplinary communication skill training. Urology resident training level correlated with technical performance but not with nontechnical performance. Urology residents consistently overestimated their nontechnical performance. Copyright © 2012 American Urological Association Education and Research, Inc. Published by Elsevier Inc. All rights reserved.

  1. Teamwork in Task Analysis. Training Manual V. Evaluation of the Marine Corps Task Analysis Program. Technical Report No. 9.

    ERIC Educational Resources Information Center

    Kuriloff, Arthur H.; Yoder, Dale

    This training manual provides guidelines for effective teamwork and work-team maintenance and development. It was designed for use in the Marine Corps Task Analysis program, in which staff members are organized to form a work-team whose continuing performance as an effective team is crucial for success of the project. Chapter 1, the major portion…

  2. The Georgetown Adolescent Intervention Team: Tri-State Technical Assistance and Training Project.

    ERIC Educational Resources Information Center

    Georgetown Univ., Washington, DC.

    Described is the program of the Georgetown Adolescent Intervention Team (Washington, D.C.), which provides interdisciplinary evaluations and diagnoses, and identifies appropriate alternative placements for developmentally disabled juvenile offenders (10-16 years old and older). The program is discussed in terms of a review of procedures for…

  3. Multidisciplinary team simulation for the operating theatre: a review of the literature.

    PubMed

    Tan, Shaw Boon; Pena, Guilherme; Altree, Meryl; Maddern, Guy J

    2014-01-01

    Analyses of adverse events inside the operating theatre has demonstrated that many errors are caused by failure in non-technical skills and teamwork. While simulation has been used successfully for teaching and improving technical skills, more recently, multidisciplinary simulation has been used for training team skills. We hypothesized that this type of training is feasible and improves team skills in the operating theatre. A systematic search of the literature for studies describing true multidisciplinary operating theatre team simulation was conducted in November and December 2012. We looked at the characteristics and outcomes of the team simulation programmes. 1636 articles were initially retrieved. Utilizing a stepwise evaluation process, 26 articles were included in the review. The studies reveal that multidisciplinary operating theatre simulation has been used to provide training in technical and non-technical skills, to help implement new techniques and technologies, and to identify latent weaknesses within a health system. Most of the studies included are descriptions of training programmes with a low level of evidence. No randomized control trial was identified. Participants' reactions to the training programme were positive in all studies; however, none of them could objectively demonstrate that skills acquired from simulation are transferred to the operating theatre or show a demonstrable benefit in patient outcomes. Multidisciplinary operating room team simulation is feasible and widely accepted by participants. More studies are required to assess the impact of this type of training on operative performance and patient safety. © 2013 Royal Australasian College of Surgeons.

  4. High-fidelity simulation-based team training in urology: evaluation of technical and nontechnical skills of urology residents during laparoscopic partial nephrectomy.

    PubMed

    Abdelshehid, Corollos S; Quach, Stephen; Nelson, Corey; Graversen, Joseph; Lusch, Achim; Zarraga, Jerome; Alipanah, Reza; Landman, Jaime; McDougall, Elspeth M

    2013-01-01

    The use of low-risk simulation training for resident education is rapidly expanding as teaching centers integrate simulation-based team training (SBTT) sessions into their education curriculum. SBTT is a valuable tool in technical and communication skills training and assessment for residents. We created a unique SBTT scenario for urology residents involving a laparoscopic partial nephrectomy procedure. Urology residents were randomly paired with a certified registered nurse anesthetists or an anesthesia resident. The scenario incorporated a laparoscopic right partial nephrectomy utilizing a unique polyvinyl alcohol kidney model with an embedded 3cm lower pole exophytic tumor and the high-fidelity SimMan3G mannequin. The Urology residents were instructed to pay particular attention to the patient's identifying information provided at the beginning of the case. Two scripted events occurred, the patient had an anaphylactic reaction to a drug and, after tumor specimen was sent for a frozen section, the confederate pathologist called into the operating room (OR) twice, first with the wrong patient name and subsequently with the wrong specimen. After the scenario was complete, technical performance and nontechnical performance were evaluated and assessed. A debriefing session followed the scenario to discuss and assess technical performance and interdisciplinary nontechnical communication between the team. All Urology residents (n = 9) rated the SBTT scenario as a useful tool in developing communication skills among the OR team and 88% rated the model as useful for technical skills training. Despite cuing to note patient identification, only 3 of 9 (33%) participants identified that the wrong patient information was presented when the confederate "pathologist" called in to report pathology results. All urology residents rated SBTT sessions as useful for the development of communication skills between different team members and making residents aware of unlikely but potential critical errors in the OR. We will continue to use SBTT as a useful method to develop resident technical and nontechnical skills outside of the high-risk operating environment. Copyright © 2013 Association of Program Directors in Surgery. Published by Elsevier Inc. All rights reserved.

  5. System Issues Related to Implementing on the Internet

    NASA Technical Reports Server (NTRS)

    Mackey, William; Bagg, Thomas C., III

    1999-01-01

    Implementing capabilities on the World Wide Web should never be taken lightly. A good systems engineer is able to examine such implementations from all points of view, including political, legal, security, access, technical deployment, and quality. The evacuation discussed in this paper was conducted to ensure that the National Aeronautics and Space Administration (NASA) was proceeding in a correct direction by implementing RECALL a Lessons Learned System on the Web and, subsequently, did so successfully. The systems approach extended well beyond technical implementation to several issue that are not often addressed by an implementation team. The resulting evaluation increased the team's sensitivity to such issues and, in fact, the authors believe that the evaluation provided as much benefit as the system itself.

  6. Development and evaluation of the Stingray, an amphibious maritime interdiction operations unmanned ground vehicle

    NASA Astrophysics Data System (ADS)

    Nguyen, Hoa G.; Castelli, Robin

    2014-06-01

    The U.S. Navy and Marine Corps conduct thousands of Maritime Interdiction Operations (MIOs) every year around the globe. Navy Visit, Board, Search, and Seizure (VBSS) teams regularly board suspect ships and perform search operations, often in hostile environments. There is a need for a small tactical robot that can be deployed ahead of the team to provide enhanced situational awareness in these boarding, breaching, and clearing operations. In 2011, the Space and Naval Warfare Systems Center Pacific conducted user evaluations on a number of small throwable robots and sensors, verified the requirements, and developed the key performance parameters (KPPs) for an MIO robot. Macro USA Corporation was then tasked to design and develop two prototype systems, each consisting of one control/display unit and two small amphibious Stingray robots. Technical challenges included the combination paddle wheel/shock-absorbing wheel, the tradeoff between impact resistance, size, and buoyancy, and achieving adequate traction on wet surfaces. This paper describes the technical design of these robots and the results of subsequent user evaluations by VBSS teams.

  7. A Multidisciplinary Research Team Approach to Computer-Aided Drafting (CAD) System Selection. Final Report.

    ERIC Educational Resources Information Center

    Franken, Ken; And Others

    A multidisciplinary research team was assembled to review existing computer-aided drafting (CAD) systems for the purpose of enabling staff in the Design Drafting Department at Linn Technical College (Missouri) to select the best system out of the many CAD systems in existence. During the initial stage of the evaluation project, researchers…

  8. Technical Evaluation Report

    DTIC Science & Technology

    2009-10-01

    of biological , behavioral & socio-cultural knowledge for the purposes of understanding those capabilities and limitations of relevance to the...However, HPM and HPO manipulations are not immune to bioethical dilemmas. With the burgeoning use of nutraceuticals, 1 control of soldiers’ diet...on the symposium recommendation and will be convening an exploratory team to discuss performance-related bioethical issues. The team will be

  9. HKHC Community Dashboard: design, development, and function of a Web-based performance monitoring system.

    PubMed

    Bors, Philip A; Kemner, Allison; Fulton, John; Stachecki, Jessica; Brennan, Laura K

    2015-01-01

    As part of Robert Wood Johnson Foundation's Healthy Kids, Healthy Communities (HKHC) national grant program, a technical assistance team designed the HKHC Community Dashboard, an online progress documentation and networking system. The Dashboard was central to HKHC's multimethod program evaluation and became a communication interface for grantees and technical assistance providers. The Dashboard was designed through an iterative process of identifying needs and priorities; designing the user experience, technical development, and usability testing; and applying visual design. The system was created with an open-source content management system and support for building an online community of users. The site developer trained technical assistance providers at the national program office and evaluators, who subsequently trained all 49 grantees. Evaluators provided support for Dashboard users and populated the site with the bulk of its uploaded tools and resource documents. The system tracked progress through an interactive work plan template, regular documentation by local staff and partners, and data coding and analysis by the evaluation team. Other features included the ability to broadcast information to Dashboard users via e-mail, event calendars, discussion forums, private messaging, a resource clearinghouse, a technical assistance diary, and real-time progress reports. The average number of Dashboard posts was 694 per grantee during the grant period. Technical assistance providers and grantees uploaded a total of 1304 resource documents. The Dashboard functions with the highest grantee satisfaction were its interfaces for sharing and progress documentation. A majority of Dashboard users (69%) indicated a preference for continued access to the Dashboard's uploaded resource documents. The Dashboard was a useful and innovative tool for participatory evaluation of a large national grant program. While progress documentation added some burden to local project staff, the system proved to be a useful resource-sharing technology.

  10. Integrating technical and non-technical skills coaching in an acute trauma surgery team training: Is it too much?

    PubMed

    Alken, Alexander; Luursema, Jan-Maarten; Weenk, Mariska; Yauw, Simon; Fluit, Cornelia; van Goor, Harry

    2017-08-25

    Research on effective integration of technical and non-technical skills in surgery team training is sparse. In a previous study we found that surgical teachers predominantly coached on technical and hardly on non-technical skills during the Definitive Surgical and Anesthetic Trauma Care (DSATC) integrated acute trauma surgery team training. This study aims to investigate whether the priming of teachers could increase the amount of non-technical skills coaching during such a training. Coaching activities of 12 surgical teachers were recorded on audio and video. Six teachers were primed on non-technical skills coaching prior to the training. Six others received no priming and served as controls. Blind observers reviewed the recordings of 2 training scenario's and scored whether the observed behaviors were directed on technical or non-technical skills. We compared the frequency of the non-technical skills coaching between the primed and the non-primed teachers and analyzed for differences according to the trainees' level of experience. Surgical teachers coached trainees during the highly realistic DSATC integrated acute trauma surgery team training. Trainees performed damage control surgery in operating teams on anesthetized porcine models during 6 training scenario's. Twelve experienced surgical teachers participated in this study. Coaching on non-technical skills was limited to about 5%. The primed teachers did not coach more often on non-technical skills than the non-primed teachers. We found no differences in the frequency of non-technical skills coaching based on the trainees' level of experience. Priming experienced surgical teachers does not increase the coaching on non-technical skills. The current DSATC acute trauma surgery team training seems too complex for integrating training on technical and non-technical skills. Patient care, Practice based learning and improvement. Copyright © 2017 Elsevier Inc. All rights reserved.

  11. The power of a collaborative relationship between technical assistance providers and community prevention teams: A correlational and longitudinal study

    PubMed Central

    Chilenski, Sarah M.; Perkins, Daniel F.; Olson, Jonathan; Hoffman, Lesa; Feinberg, Mark E.; Greenberg, Mark; Welsh, Janet; Crowley, D. Max; Spoth, Richard

    2015-01-01

    Background Historically, effectiveness of community collaborative prevention efforts has been mixed. Consequently, research has been undertaken to better understand the factors that support their effectiveness; theory and some related empirical research suggests that the provision of technical assistance is one important supporting factor. The current study examines one aspect of technical assistance that may be important in supporting coalition effectiveness, the collaborative relationship between the technical assistance provider and site lead implementer. Methods Four and one-half years of data were collected from technical assistance providers and prevention team members from the 14 community prevention teams involved in the PROSPER project. Results Spearman correlation analyses with longitudinal data show that the levels of the collaborative relationship during one phase of collaborative team functioning associated with characteristics of internal team functioning in future phases. Conclusions Results suggest that community collaborative prevention work should consider the collaborative nature of the technical assistance provider – prevention community team relationship when designing and conducting technical assistance activities, and it may be important to continually assess these dynamics to support high quality implementation. PMID:26476860

  12. Report on the oversight assessment of the operational readiness review of the Replacement Tritium Facility at Savannah River Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lee, B.T.

    1993-03-01

    This report presents the results of an oversight assessment (OA) conducted by the US Department of Energy's (DOE) Office of Environment, Safety and Health (EH) of operational readiness review (ORR) activities for the Replacement Tritium Facility (RTF) located at Savannah River Site (SRS). The EH OA of this facility took place concurrently with an ORR conducted by the DOE Office of Defense Programs (DP). The DP ORR was conducted from January 19 through February 5, 1993. The EH OA was performed in accordance with the protocol and procedures specified in EH Program for Oversight Assessment of Operational Readiness Evaluations formore » Startups and Restarts,'' dated September 15, 1992. The EH OA Team evaluated the DP ORR to determine whether it was thorough and demonstrated sufficient inquisitiveness to verify that the implementation of programs and procedures adequately ensures the protection of worker safety and health. The EH OA Team performed its evaluation of the DP ORR in the following technical areas: occupational safety, industrial hygiene, and respiratory protection; fire protection; and chemical safety. In the areas of fire protection and chemical safety, the EH OA Team conducted independent vertical-slice reviews to confirm DP ORR results. Within each technical area, the EH OA Team reviewed the DP ORR Plan, including the Criteria Review and Approach Documents (CRADs); the qualifications of individual DP ORR team members; the performance of planned DP ORR activities; and the results of the DP ORR.« less

  13. Report on the oversight assessment of the operational readiness review of the Replacement Tritium Facility at Savannah River Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lee, B.T.

    1993-03-01

    This report presents the results of an oversight assessment (OA) conducted by the US Department of Energy`s (DOE) Office of Environment, Safety and Health (EH) of operational readiness review (ORR) activities for the Replacement Tritium Facility (RTF) located at Savannah River Site (SRS). The EH OA of this facility took place concurrently with an ORR conducted by the DOE Office of Defense Programs (DP). The DP ORR was conducted from January 19 through February 5, 1993. The EH OA was performed in accordance with the protocol and procedures specified in ``EH Program for Oversight Assessment of Operational Readiness Evaluations formore » Startups and Restarts,`` dated September 15, 1992. The EH OA Team evaluated the DP ORR to determine whether it was thorough and demonstrated sufficient inquisitiveness to verify that the implementation of programs and procedures adequately ensures the protection of worker safety and health. The EH OA Team performed its evaluation of the DP ORR in the following technical areas: occupational safety, industrial hygiene, and respiratory protection; fire protection; and chemical safety. In the areas of fire protection and chemical safety, the EH OA Team conducted independent vertical-slice reviews to confirm DP ORR results. Within each technical area, the EH OA Team reviewed the DP ORR Plan, including the Criteria Review and Approach Documents (CRADs); the qualifications of individual DP ORR team members; the performance of planned DP ORR activities; and the results of the DP ORR.« less

  14. Non-technical skills assessment in surgery.

    PubMed

    Sharma, Bharat; Mishra, Amit; Aggarwal, Rajesh; Grantcharov, Teodor P

    2011-09-01

    Adverse events in surgery have highlighted the importance of non-technical skills, such as communication, decision-making, teamwork, situational awareness and leadership, to effective organizational performance. These skills carry particular importance to surgical oncology, as members of a multidisciplinary team must work cohesively to formulate effective patient care plans. Several non-technical skills evaluation tools have been developed for use in surgery, without adequate comparison and consensus on which should be standard for training. Eleven articles describing the use of three non-technical evaluation tools related to surgery: NOTSS (Non Technical Skills for Surgeons), NOTECHS (Non Technical Skills) and OTAS (Observational Teamwork Assessment for Surgery) were analyzed with respect to scale formulation, validity, reliability and feasibility. Furthermore, their use in training thus far and the future of non-technical rating scales in surgical curricula was discussed. Future work should focus on incorporating these assessment tools into training and into a real operating room setting to provide formative evaluations for surgical residents. Copyright © 2010 Elsevier Ltd. All rights reserved.

  15. Data development technical support document for the aircraft crash risk analysis methodology (ACRAM) standard

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kimura, C.Y.; Glaser, R.E.; Mensing, R.W.

    1996-08-01

    The Aircraft Crash Risk Analysis Methodology (ACRAM) Panel has been formed by the US Department of Energy Office of Defense Programs (DOE/DP) for the purpose of developing a standard methodology for determining the risk from aircraft crashes onto DOE ground facilities. In order to accomplish this goal, the ACRAM panel has been divided into four teams, the data development team, the model evaluation team, the structural analysis team, and the consequence team. Each team, consisting of at least one member of the ACRAM plus additional DOE and DOE contractor personnel, specializes in the development of the methodology assigned to thatmore » team. This report documents the work performed by the data development team and provides the technical basis for the data used by the ACRAM Standard for determining the aircraft crash frequency. This report should be used to provide the generic data needed to calculate the aircraft crash frequency into the facility under consideration as part of the process for determining the aircraft crash risk to ground facilities as given by the DOE Standard Aircraft Crash Risk Assessment Methodology (ACRAM). Some broad guidance is presented on how to obtain the needed site-specific and facility specific data but this data is not provided by this document.« less

  16. The Effects of Integrating On-Going Training for Technical Documentation Teams

    ERIC Educational Resources Information Center

    Catanio, Joseph T.; Catanio, Teri L.

    2010-01-01

    The tools and techniques utilized in the technical communications profession are constantly improving and changing. Information Technology (IT) organizations devote the necessary resources to equip and train engineering, marketing, and sales teams, but often fail to do so for technical documentation teams. Many IT organizations tend to view…

  17. Relationship between non-technical skills and technical performance during cardiopulmonary resuscitation: does stress have an influence?

    PubMed

    Krage, Ralf; Zwaan, Laura; Tjon Soei Len, Lian; Kolenbrander, Mark W; van Groeningen, Dick; Loer, Stephan A; Wagner, Cordula; Schober, Patrick

    2017-11-01

    Non-technical skills, such as task management, leadership, situational awareness, communication and decision-making refer to cognitive, behavioural and social skills that contribute to safe and efficient team performance. The importance of these skills during cardiopulmonary resuscitation (CPR) is increasingly emphasised. Nonetheless, the relationship between non-technical skills and technical performance is poorly understood. We hypothesise that non-technical skills become increasingly important under stressful conditions when individuals are distracted from their tasks, and investigated the relationship between non-technical and technical skills under control conditions and when external stressors are present. In this simulator-based randomised cross-over study, 30 anaesthesiologists and anaesthesia residents from the VU University Medical Center, Amsterdam, the Netherlands, participated in two different CPR scenarios in random order. In one scenario, external stressors (radio noise and a distractive scripted family member) were added, while the other scenario without stressors served as control condition. Non-technical performance of the team leader and technical performance of the team were measured using the 'Anaesthetists' Non-technical Skill' score and a recently developed technical skills score. Analysis of variance and Pearson correlation coefficients were used for statistical analyses. Non-technical performance declined when external stressors were present (adjusted mean difference 3.9 points, 95% CI 2.4 to 5.5 points). A significant correlation between non-technical and technical performance scores was observed when external stressors were present (r=0.67, 95% CI 0.40 to 0.83, p<0.001), while no evidence for such a relationship was observed under control conditions (r=0.15, 95% CI -0.22 to 0.49, p=0.42). This was equally true for all individual domains of the non-technical performance score (task management, team working, situation awareness, decision-making). During CPR with external stressors, the team's technical performance is related to the non-technical skills of the team leader. This may have important implications for training of CPR teams. © Article author(s) (or their employer(s) unless otherwise stated in the text of the article) 2017. All rights reserved. No commercial use is permitted unless otherwise expressly granted.

  18. Interview: Mr. Stephen Chee, team leader, UNFPA country support team (CST) for the South Pacific.

    PubMed

    1993-09-01

    The UNFPA country support team (CST) for the South Pacific is the action-arm at the regional level of the new Technical Support Services arrangement introduced by the agency. Operational since April 1993, the CST currently covers the following Pacific island countries or territories: the Cook Islands, the Federated States of Micronesia, Fiji, Kiribati, Marshall Islands, Nauru, Niue, Palau, Papua New Guinea, Samoa, Solomon Islands, Tokelau, Tonga, Tuvalu, and Vanuatu. The CST office is located in Suva, Fiji, with the main goal of strengthening national capacity and building self-reliance in the countries of the region. The office in Suva is currently staffed by six highly qualified advisors with extensive experience in the population and related fields; two more advisors are expected to join the Team in early 1994. The Team is well equipped to provide countries and territories of the region with a wide range of technical support services ranging from ad hoc technical advisory services to the conceptualization and development of comprehensive population policies and programs. Services are offered in the areas of basic data collection, processing, and research in population dynamics; population policy formulation, evaluation, and implementation; family planning and maternal-child health; information, education, and communication; women in population and development; and population program management. The team also plays an advocacy role in mainstreaming population concerns into the programs and activities of international, regional, and national organizations. The team leader responds to questions about population problems experienced by the countries served, the scope of UNFPA assistance to country governments in the subregion, the importance of population information in the subregion, and how Asia-Pacific POPIN may help the team and countries served.

  19. NASA Hydrogen Research for Spaceport and Space Based Applications

    NASA Technical Reports Server (NTRS)

    Anderson, Tim

    2005-01-01

    Project management activities for this grant includes internal oversight, coordination and facilitation among research groups (internal to UF and external); system and/or trade studies to assist in evaluating and prioritizing new hydrogen production processes that may become available for potential research investigations; a technical and programmatic outreach activity; and formal reporting, including periodic technical reviews with the NASA team.

  20. The power of a collaborative relationship between technical assistance providers and community prevention teams: A correlational and longitudinal study.

    PubMed

    Chilenski, Sarah M; Perkins, Daniel F; Olson, Jonathan; Hoffman, Lesa; Feinberg, Mark E; Greenberg, Mark; Welsh, Janet; Crowley, D Max; Spoth, Richard

    2016-02-01

    Historically, effectiveness of community collaborative prevention efforts has been mixed. Consequently, research has been undertaken to better understand the factors that support their effectiveness; theory and some related empirical research suggests that the provision of technical assistance is one important supporting factor. The current study examines one aspect of technical assistance that may be important in supporting coalition effectiveness, the collaborative relationship between the technical assistance provider and site lead implementer. Four and one-half years of data were collected from technical assistance providers and prevention team members from the 14 community prevention teams involved in the PROSPER project. Spearman correlation analyses with longitudinal data show that the levels of the collaborative relationship during one phase of collaborative team functioning associated with characteristics of internal team functioning in future phases. Results suggest that community collaborative prevention work should consider the collaborative nature of the technical assistance provider - prevention community team relationship when designing and conducting technical assistance activities, and it may be important to continually assess these dynamics to support high quality implementation. Copyright © 2015 Elsevier Ltd. All rights reserved.

  1. A Focused Report Presented to North Central Association of Colleges and Schools.

    ERIC Educational Resources Information Center

    Colorado Technical Coll., Colorado Springs.

    During January 23-24, 1984, a North Central Association of Colleges and Schools evaluation team visited Colorado Technical College to conduct a comprehensive evaluation for continued accreditation at the bachelor's degree granting level. The accreditation was continued as a result, and it was recommended that a comprehensive evaluation be…

  2. Project T.E.A.M. (Technical Education Advancement Modules). Introduction to Industrial Physics.

    ERIC Educational Resources Information Center

    Whisenhunt, James E.

    This instructional guide, one of a series developed by the Technical Education Advancement Modules (TEAM) project, is a 20-hour introduction to industrial physics that explains and demonstrates to industrial maintenance mechanics the direct relationship of physics to machinery. Project TEAM is intended to upgrade basic technical competencies of…

  3. Crisis Team Management in a Scarce Resource Setting: Angkor Hospital for Children in Siem Reap, Cambodia.

    PubMed

    Henker, Richard Alynn; Henker, Hiroko; Eng, Hor; O'Donnell, John; Jirativanont, Tachawan

    2017-01-01

    A crisis team management (CTM) simulation course was developed by volunteers from Health Volunteers Overseas for physicians and nurses at Angkor Hospital for Children (AHC) in Siem Reap, Cambodia. The framework for the course was adapted from crisis resource management (1, 2), crisis team training (3), and TeamSTEPPs© models (4). The CTM course focused on teaching physicians and nurses on the development of team performance knowledge, skills, and attitudes. Challenges to providing this course at AHC included availability of simulation equipment, cultural differences in learning, and language barriers. The purpose of this project was to evaluate the impact of a CTM simulation course at AHC on attitudes and perceptions of participants on concepts related to team performance. Each of the CTM courses consisted of three lectures, including team performance concepts, communication, and debriefing followed by rotation through four simulation scenarios. The evaluation instrument used to evaluate the AHC CTM course was developed for Cambodian staff at AHC based on TeamSTEPPs© instruments evaluating attitude and perceptions of team performance (5). CTM team performance concepts included in lectures, debriefing sessions, and the evaluation instrument were: team structure, leadership, situation monitoring, mutual support, and communication. The Wilcoxon signed-rank test was used to analyze pre- and post-test paired data from participants in the course. Of the 54 participants completing the three CTM courses at AHC, 27 were nurses, 6 were anesthetists, and 21 were physicians. Attitude and perception scores were found to significantly improve ( p  < 0.05) for team structure, leadership, situation monitoring, and communication. Team performance areas that improved the most were: discussion of team performance, communication, and exchange of information. Teaching of non-technical skills can be effective in a setting with scarce resources in a Southeastern Asian country.

  4. Technical performance and match-to-match variation in elite football teams.

    PubMed

    Liu, Hongyou; Gómez, Miguel-Angel; Gonçalves, Bruno; Sampaio, Jaime

    2016-01-01

    Recent research suggests that match-to-match variation adds important information to performance descriptors in team sports, as it helps measure how players fine-tune their tactical behaviours and technical actions to the extreme dynamical environments. The current study aims to identify the differences in technical performance of players from strong and weak teams and to explore match-to-match variation of players' technical match performance. Performance data of all the 380 matches of season 2012-2013 in the Spanish First Division Professional Football League were analysed. Twenty-one performance-related match actions and events were chosen as variables in the analyses. Players' technical performance profiles were established by unifying count values of each action or event of each player per match into the same scale. Means of these count values of players from Top3 and Bottom3 teams were compared and plotted into radar charts. Coefficient of variation of each match action or event within a player was calculated to represent his match-to-match variation of technical performance. Differences in the variation of technical performances of players across different match contexts (team and opposition strength, match outcome and match location) were compared. All the comparisons were achieved by the magnitude-based inferences. Results showed that technical performances differed between players of strong and weak teams from different perspectives across different field positions. Furthermore, the variation of the players' technical performance is affected by the match context, with effects from team and opposition strength greater than effects from match location and match outcome.

  5. The effect of teamwork training on team performance and clinical outcome in elective orthopaedic surgery: a controlled interrupted time series study.

    PubMed

    Morgan, Lauren; Hadi, Mohammed; Pickering, Sharon; Robertson, Eleanor; Griffin, Damian; Collins, Gary; Rivero-Arias, Oliver; Catchpole, Ken; McCulloch, Peter; New, Steve

    2015-04-20

    To evaluate the effectiveness of aviation-style teamwork training in improving operating theatre team performance and clinical outcomes. 3 operating theatres in a UK district general hospital, 1 acting as a control group and the other 2 as the intervention group. 72 operations (37 intervention, 35 control) were observed in full by 2 trained observers during two 3-month observation periods, before and after the intervention period. A 1-day teamwork training course for all staff, followed by 6 weeks of weekly in-service coaching to embed learning. We measured team non-technical skills using Oxford NOTECHS II, (evaluating the whole team and the surgical, anaesthetic and nursing subteams, and evaluated technical performance using the Glitch count. We evaluated compliance with the WHO checklist by recording whether time-out (T/O) and sign-out (S/O) were attempted, and whether T/O was fully complied with. We recorded complications, re-admissions and duration of hospital stay using hospital administrative data. We compared the before-after change in the intervention and control groups using 2-way analysis of variance (ANOVA) and regression modelling. Mean NOTECHS II score increased significantly from 71.6 to 75.4 in the active group but remained static in the control group (p=0.047). Among staff subgroups, the nursing score increased significantly (p=0.006), but the anaesthetic and surgical scores did not. The attempt rate for WHO T/O procedures increased significantly in both active and control groups, but full compliance with T/O improved only in the active group (p=0.003). Mean glitch rate was unchanged in the control group but increased significantly (7.2-10.2/h, p=0.002) in the active group. Teamwork training was associated with improved non-technical skills in theatre teams but also with a rise in operative glitches. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://group.bmj.com/group/rights-licensing/permissions.

  6. An Overview of the Role of the Unit Ministry Team (UMT) in Operation Desert/Shield/Desert Storm with a Critical Evaluation of Religious Support Activities and Technical Doctrine, and Command Team Assessment of UMT Actions, Capabilities and Effectiveness

    DTIC Science & Technology

    1992-04-03

    CAPABILITIES AND EFFECTIVENESS U J 1 V> ELECTE ~ JUN181Ö92 BY COLONEL HERMAN KEIZER, JR., CHAPLAIN COLONEL KENNETH A. SEIFRIED, CHAPLAIN LIEUTENANT...Religious Support Activities and Tech- nical Doctrine, and Command Team Assessment of UMT Actions. Capabilities, and Effectiveness 12. PERSONAL AUTHOR...historical review in order to provide pragmatic recommendations for effective religious support in the next war. 20. DISTRIBUTION/AVAILABILITY OF

  7. 33 CFR 385.21 - Quality control.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... will be produced by a Project Delivery Team. The quality control plan shall be included in the Project... Corps of Engineers and the non-Federal sponsor shall establish a Technical Review Team to conduct.... The members of the Technical Review Team shall be independent of the Project Delivery Team and the...

  8. A Comparison of Physical and Technical Performance Profiles Between Successful and Less-Successful Professional Rugby League Teams.

    PubMed

    Kempton, Thomas; Sirotic, Anita C; Coutts, Aaron J

    2017-04-01

    To examine differences in physical and technical performance profiles using a large sample of match observations drawn from successful and less-successful professional rugby league teams. Match activity profiles were collected using global positioning satellite (GPS) technology from 29 players from a successful rugby league team during 24 games and 25 players from a less-successful team during 18 games throughout 2 separate competition seasons. Technical performance data were obtained from a commercial statistics provider. A progressive magnitude-based statistical approach was used to compare differences in physical and technical performance variables between the reference teams. There were no clear differences in playing time, absolute and relative total distances, or low-speed running distances between successful and less-successful teams. The successful team possibly to very likely had lower higher-speed running demands and likely had fewer physical collisions than the less-successful team, although they likely to most likely demonstrated more accelerations and decelerations and likely had higher average metabolic power. The successful team very likely gained more territory in attack, very likely had more possessions, and likely committed fewer errors. In contrast, the less-successful team was likely required to attempt more tackles, most likely missed more tackles, and very likely had a lower effective tackle percentage. In the current study, successful match performance was not contingent on higher match running outputs or more physical collisions; rather, proficiency in technical performance components better differentiated successful and less-successful teams.

  9. Quality Improvement in Surgery Combining Lean Improvement Methods with Teamwork Training: A Controlled Before-After Study

    PubMed Central

    Robertson, Eleanor; Morgan, Lauren; New, Steve; Pickering, Sharon; Hadi, Mohammed; Collins, Gary; Rivero Arias, Oliver; Griffin, Damian; McCulloch, Peter

    2015-01-01

    Background To investigate the effectiveness of combining teamwork training and lean process improvement, two distinct approaches to improving surgical safety. We conducted a controlled interrupted time series study in a specialist UK Orthopaedic hospital incorporating a plastic surgery team (which received the intervention) and an Orthopaedic theatre team acting as a control. Study Design We used a 3 month intervention with 3 months data collection period before and after it. A combined teamwork training and lean process improvement intervention was delivered by an experienced specialist team. Before and after the intervention we evaluated team non-technical skills using NOTECHS II, technical performance using the glitch rate and WHO checklist compliance using a simple 3 point scale. We recorded complication rate, readmission rate and length of hospital stay data for 6 months before and after the intervention. Results In the active group, but not the control group, full compliance with WHO Time Out (T/O) increased from 14 to 71% (p = 0.032), Sign Out attempt rate (S/O) increased from 0% to 50% (p<0.001) and Oxford NOTECHS II scores increased after the intervention (P = 0.058). Glitch rate decreased in the active group and increased in the control group (p = 0.001). Complications and length of stay appeared to rise in the control group and fall in the active group. Conclusions Combining teamwork training and systems improvement enhanced both technical and non-technical operating team process measures, and were associated with a trend to better safety outcome measures in a controlled study comparison. We suggest that approaches which address both system and culture dimensions of safety may prove valuable in reducing risks to patients. PMID:26381643

  10. Technical discussions on Emissions and Atmospheric Modeling (TEAM)

    NASA Astrophysics Data System (ADS)

    Frost, G. J.; Henderson, B.; Lefer, B. L.

    2017-12-01

    A new informal activity, Technical discussions on Emissions and Atmospheric Modeling (TEAM), aims to improve the scientific understanding of emissions and atmospheric processes by leveraging resources through coordination, communication and collaboration between scientists in the Nation's environmental agencies. TEAM seeks to close information gaps that may be limiting emission inventory development and atmospheric modeling and to help identify related research areas that could benefit from additional coordinated efforts. TEAM is designed around webinars and in-person meetings on particular topics that are intended to facilitate active and sustained informal communications between technical staff at different agencies. The first series of TEAM webinars focuses on emissions of nitrogen oxides, a criteria pollutant impacting human and ecosystem health and a key precursor of ozone and particulate matter. Technical staff at Federal agencies with specific interests in emissions and atmospheric modeling are welcome to participate in TEAM.

  11. Relationship between non-technical skills and technical performance during cardiopulmonary resuscitation: does stress have an influence?

    PubMed Central

    Krage, Ralf; Zwaan, Laura; Tjon Soei Len, Lian; Kolenbrander, Mark W; van Groeningen, Dick; Loer, Stephan A; Wagner, Cordula; Schober, Patrick

    2017-01-01

    Background Non-technical skills, such as task management, leadership, situational awareness, communication and decision-making refer to cognitive, behavioural and social skills that contribute to safe and efficient team performance. The importance of these skills during cardiopulmonary resuscitation (CPR) is increasingly emphasised. Nonetheless, the relationship between non-technical skills and technical performance is poorly understood. We hypothesise that non-technical skills become increasingly important under stressful conditions when individuals are distracted from their tasks, and investigated the relationship between non-technical and technical skills under control conditions and when external stressors are present. Methods In this simulator-based randomised cross-over study, 30 anaesthesiologists and anaesthesia residents from the VU University Medical Center, Amsterdam, the Netherlands, participated in two different CPR scenarios in random order. In one scenario, external stressors (radio noise and a distractive scripted family member) were added, while the other scenario without stressors served as control condition. Non-technical performance of the team leader and technical performance of the team were measured using the ‘Anaesthetists’ Non-technical Skill’ score and a recently developed technical skills score. Analysis of variance and Pearson correlation coefficients were used for statistical analyses. Results Non-technical performance declined when external stressors were present (adjusted mean difference 3.9 points, 95% CI 2.4 to 5.5 points). A significant correlation between non-technical and technical performance scores was observed when external stressors were present (r=0.67, 95% CI 0.40 to 0.83, p<0.001), while no evidence for such a relationship was observed under control conditions (r=0.15, 95% CI −0.22 to 0.49, p=0.42). This was equally true for all individual domains of the non-technical performance score (task management, team working, situation awareness, decision-making). Conclusions During CPR with external stressors, the team’s technical performance is related to the non-technical skills of the team leader. This may have important implications for training of CPR teams. PMID:28844039

  12. PRACA Enhancement Pilot Study Report: Engineering for Complex Systems Program (formerly Design for Safety), DFS-IC-0006

    NASA Technical Reports Server (NTRS)

    Korsmeyer, David; Schreiner, John

    2002-01-01

    This technology evaluation report documents the findings and recommendations of the Engineering for Complex Systems Program (formerly Design for Safety) PRACA Enhancement Pilot Study of the Space Shuttle Program's (SSP's) Problem Reporting and Corrective Action (PRACA) System. A team at NASA Ames Research Center (ARC) performed this Study. This Study was initiated as a follow-on to the NASA chartered Shuttle Independent Assessment Team (SIAT) review (performed in the Fall of 1999) which identified deficiencies in the current PRACA implementation. The Pilot Study was launched with an initial qualitative assessment and technical review performed during January 2000 with the quantitative formal Study (the subject of this report) started in March 2000. The goal of the PRACA Enhancement Pilot Study is to evaluate and quantify the technical aspects of the SSP PRACA systems and recommend enhancements to address deficiencies and in preparation for future system upgrades.

  13. Project T.E.A.M. (Technical Education Advancement Modules). Final Report.

    ERIC Educational Resources Information Center

    Greenville Technical Coll., SC.

    Project TEAM (Technical Education Advancement Modules), a cooperative demonstration program for high technology training, created an introductory technical training program and a consumer education package emphasizing the benefits of technical training. The curriculum and training focus of the project began with an assessment of employee needs in…

  14. Leadership Team | Water Power | NREL

    Science.gov Websites

    leading wind energy and water power research efforts in structural analysis and simulation, computational Leadership Team Leadership Team Learn more about the expertise and technical skills of the water power research team and staff at NREL. Photo of Daniel Laird Daniel Laird Center Director I-Technical Dr

  15. Exploring Mission Concepts with the JPL Innovation Foundry A-Team

    NASA Technical Reports Server (NTRS)

    Ziemer, John K.; Ervin, Joan; Lang, Jared

    2013-01-01

    The JPL Innovation Foundry has established a new approach for exploring, developing, and evaluating early concepts called the A-Team. The A-Team combines innovative collaborative methods with subject matter expertise and analysis tools to help mature mission concepts. Science, implementation, and programmatic elements are all considered during an A-Team study. Methods are grouped by Concept Maturity Level (CML), from 1 through 3, including idea generation and capture (CML 1), initial feasibility assessment (CML 2), and trade space exploration (CML 3). Methods used for each CML are presented, and the key team roles are described from two points of view: innovative methods and technical expertise. A-Team roles for providing innovative methods include the facilitator, study lead, and assistant study lead. A-Team roles for providing technical expertise include the architect, lead systems engineer, and integration engineer. In addition to these key roles, each A-Team study is uniquely staffed to match the study topic and scope including subject matter experts, scientists, technologists, flight and instrument systems engineers, and program managers as needed. Advanced analysis and collaborative engineering tools (e.g. cost, science traceability, mission design, knowledge capture, study and analysis support infrastructure) are also under development for use in A-Team studies and will be discussed briefly. The A-Team facilities provide a constructive environment for innovative ideas from all aspects of mission formulation to eliminate isolated studies and come together early in the development cycle when they can provide the biggest impact. This paper provides an overview of the A-Team, its study processes, roles, methods, tools and facilities.

  16. Space station attached payload program support

    NASA Technical Reports Server (NTRS)

    Estes, Maurice G., Jr.; Brown, Bardle D.

    1989-01-01

    The USRA is providing management and technical support for the peer review of the Space Station Freedom Attached Payload proposals. USRA is arranging for consultants to evaluate proposals, arranging meeting facilities for the reviewers to meet in Huntsville, Alabama and management of the actual review meetings. Assistance in developing an Experiment Requirements Data Base and Engineering/Technical Assessment support for the MSFC Technical Evaluation Team is also being provided. The results of the project will be coordinated into a consistent set of reviews and reports by USRA. The strengths and weaknesses analysis provided by the peer panel reviewers will by used NASA personnel in the selection of experiments for implementation on the Space Station Freedom.

  17. FloorPlan. Courseware Evaluation for Vocational and Technical Education.

    ERIC Educational Resources Information Center

    Rosenfeld, Vila M.; And Others

    This courseware evaluation rates the "FloorPlan" program developed by the Learning Seed. (The program--not included in this document--allows room design and arrangement to be performed on the computer screen.) The courseware was rated by a team of home economists participating in a network for the dissemination of courseware reviews.…

  18. Office for Analysis and Evaluation of Operational Data 1994-FY 95 annual report. Volume 9, Number 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    This annual report of the US Nuclear Regulatory Commission`s Office for Analysis and Evaluation of Operational Data (AEOD) describes activities conducted during CY 1994 and FY 1995. The report is published in three parts. NUREG-1272, Vol. 9, No. 1, covers power reactors and presents an overview of the operating experience of the nuclear power industry from the NRC perspective, including comments about the trends of some key performance measures. The report also includes the principal findings and issues identified in AEOD studies over the past year and summarizes information from such sources as licensee event reports, diagnostic evaluations, and reportsmore » to the NRC`s Operations Center. NUREG-1272, Vol. 9, No. 2, covers nuclear materials and presents a review of the events and concerns associated with the use of licensed material in nonreactor applications, such as personnel overexposures and medical misadministrations. Both reports also contain a discussion of the Incident Investigation Team program and summarize both the Incident Investigation Team and Augmented Inspection Team reports. Each volume contains a list of the AEOD reports issued from 1980 through FY 1995. NUREG-1272, Vol. 9, No. 3, covers technical training and presents the activities of the Technical Training Center in support of the NRC`s mission.« less

  19. Solar Technical Assistance Team (STAT) (Fact Sheet)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The Solar Technical Assistance Team (STAT) is a team of solar technology and deployment experts who ensure that the best information on policies, regulations, financing, and other issues is getting into the hands of state government decision makers when they need it.

  20. Evaluation of the Florida coordinated school health program pilot schools project.

    PubMed

    Weiler, Robert M; Pigg, R Morgan; McDermott, Robert J

    2003-01-01

    The Florida Department of Education, with CDC funding, designed the Florida Coordinated School Health Program Pilot Schools Project (PSP) to encourage innovative approaches to promote coordinated school health programs (CSHP) in Florida schools. Each of eight pilot schools received $15,000 in project funding, three years of technical assistance including on-site and off-site assistance, a project office resource center, mailings of resource materials, needs assessment and evaluation assistance, and three PSP Summer Institutes. Project evaluators created a context evaluation, approaching each school independently as a "case study" to measure the school's progress in meeting goals established at baseline. Data were collected using the How Healthy is Your School? needs assessment instrument, a School Health Portfolio constructed by each school team, a Pilot Schools Project Team Member Survey instrument, midcourse team interviews, final team interviews, and performance indicator data obtained from pilot and control schools. The PSP posed two fundamental questions: "Can financial resources, professional training, and technical assistance enable individual schools to create and sustain a coordinated school health program?" and "What outcomes reasonably can one expect from a coordinated school health program, assuming programs receive adequate support over time?" First, activities at the eight schools confirmed that a coordinated school health programs can be established and sustained. Program strength and sustainability depend on long-term resources, qualified personnel, and administrative support. Second, though coordinated school health programs may improve school performance indicators, the PSP yielded insufficient evidence to support that belief. Future projects should include robust measurement and evaluation designs, thereby producing conclusive evidence about the influence of a coordinated school health program on such outcomes.

  1. Software Capability Evaluation (SCE) Version 2.0 Implementation Guide

    DTIC Science & Technology

    1994-02-01

    Affected By SCE B-40 Figure 3-1 SCE Usage Decision Making Criteria 3-44 Figure 3-2 Estimated SCE Labor For One Source Selection 3-53 Figure 3-3 SCE...incorporated into the source selection sponsoring organization’s technical/management team for incorporation into acquisition decisions . The SCE team...expertise, past performance, and organizational capacity in acquisition decisions . The Capability Maturity Model Basic Concepts The CMM is based on the

  2. Production Plan and Formative Evaluation Report.

    ERIC Educational Resources Information Center

    Castle, Thomas J.; And Others

    1981-01-01

    Instructional development projects in Medical Terminology and Orientation to Hearing Aids are reviewed to demonstrate the procedural steps used and the interactive dynamics employed by development teams at the National Technical Institute for the Deaf. Six references are provided. (MER)

  3. Assurance Policy Evaluation - Spacecraft and Strategic Systems

    DTIC Science & Technology

    2014-09-17

    electromechanical (EEE) parts, software, design and workmanship, work instructions, manufacturing and tooling, cleanrooms, electrostatic discharge ...T9001B.  An external group, called the Evaluation and Assessment Team, made up of product assurance subject matter experts from NSWC Corona performs...NSWC, Corona and SSP Technical Branch(es). The FTPE, performed every 3 years, is an objective evaluation of facility performance to assure proper

  4. Building, Maintaining, and Ending Relationships: An Urban School District and a Technical Assistance Team. Documentation and Technical Assistance in Urban Schools.

    ERIC Educational Resources Information Center

    Holmes, Manford L.

    This paper describes the nature of the relationships developed between the technical assistance team of the Documentation and Technical Assistance (DTA) Project and members of a Chicago (Illinois) school district staff with whom the DTA worked. First, the methodology with which the technical assistance work was studied is described, as is the…

  5. 15 CFR 270.200 - Technical conduct of investigation.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY, DEPARTMENT OF COMMERCE NATIONAL CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Investigations § 270.200 Technical conduct of investigation. (a... hours of the event, if possible. The Director may establish and deploy a Team to conduct the preliminary...

  6. 15 CFR 270.200 - Technical conduct of investigation.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY, DEPARTMENT OF COMMERCE NATIONAL CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Investigations § 270.200 Technical conduct of investigation. (a... hours of the event, if possible. The Director may establish and deploy a Team to conduct the preliminary...

  7. 15 CFR 270.200 - Technical conduct of investigation.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY, DEPARTMENT OF COMMERCE NATIONAL CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Investigations § 270.200 Technical conduct of investigation. (a... hours of the event, if possible. The Director may establish and deploy a Team to conduct the preliminary...

  8. 15 CFR 270.200 - Technical conduct of investigation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY, DEPARTMENT OF COMMERCE NATIONAL CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Investigations § 270.200 Technical conduct of investigation. (a... hours of the event, if possible. The Director may establish and deploy a Team to conduct the preliminary...

  9. 15 CFR 270.200 - Technical conduct of investigation.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY, DEPARTMENT OF COMMERCE NATIONAL CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Investigations § 270.200 Technical conduct of investigation. (a... hours of the event, if possible. The Director may establish and deploy a Team to conduct the preliminary...

  10. Patient-specific simulation in carotid artery stenting.

    PubMed

    Willaert, Willem; Aggarwal, Rajesh; Bicknell, Colin; Hamady, Mo; Darzi, Ara; Vermassen, Frank; Cheshire, Nicholas

    2010-12-01

    Patient-specific virtual reality (VR) simulation is a technologic advancement that allows planning and practice of the carotid artery stenting (CAS) procedure before it is performed on the patient. The initial findings are reported, using this novel VR technique as a tool to optimize technical and nontechnical aspects of this complex endovascular procedure. In the angiography suite, the same interventional team performed the VR rehearsal and the actual CAS on the patient. All proceedings were recorded to allow for video analysis of team, technical, and nontechnical skills. Analysis of both procedures showed identical use of endovascular tools, similar access strategy, and a high degree of similarity between the angiography images. The total procedure time (24.04 vs 60.44 minutes), fluoroscopy time (11.19 vs 21.04 minutes), and cannulation of the common carotid artery (1.35 vs 9.34) took considerably longer in reality. An extensive questionnaire revealed that all team members found that the rehearsal increased the subjective sense of teamwork (4/5), communication (4/5), and patient safety (4/5). A VR procedure rehearsal is a practical and feasible preparatory tool for CAS and shows a high correlation with the real procedure. It has the potential to enhance the technical, nontechnical, and team performance. Further research is needed to evaluate if this technology can lead to improved outcomes for patients. Copyright © 2010 Society for Vascular Surgery. Published by Mosby, Inc. All rights reserved.

  11. DESCRIPTION OF RISK REDUCTION ENGINEERING LABORATORY TEST AND EVALUATION FACILITIES

    EPA Science Inventory

    An onsite team of multidisciplined engineers and scientists conduct research and provide technical services in the areas of testing, design, and field implementation for both solid and hazardous waste management. Engineering services focus on the design and implementation of...

  12. Defining hazards of supplemental oxygen therapy in neonatology using the FMEA tool.

    PubMed

    van der Eijk, Anne Catherine; Rook, Denise; Dankelman, Jenny; Smit, Bert Johan

    2013-01-01

    To prospectively evaluate hazards in the process of supplemental oxygen therapy in very preterm infants hospitalized in a Dutch NICU. A Failure Mode and Effects Analysis (FMEA) was conducted by a multidisciplinary team. This team identified, evaluated, and prioritized hazards of supplemental oxygen therapy in preterm infants. After accrediting "hazard scores" for each step in this process, recommendations were formulated for the main hazards. Performing the FMEA took seven meetings of 2 hours. The top 10 hazards could all be categorized into three main topics: incorrect adjustment of the fraction of inspired oxygen (FiO2), incorrect alarm limits for SpO2, and incorrect pulse-oximetry alarm limits on patient monitors for temporary use. The FMEA culminated in recommendations in both educational and technical directions. These included suggestions for (changes in) protocols on alarm limits and manual FiO2 adjustments, education of NICU staff on hazards of supplemental oxygen, and technical improvements in respiratory devices and patient monitors. The FMEA prioritized flaws in the process of supplemental oxygen therapy in very preterm infants. Thanks to the structured approach of the analysis by a multidisciplinary team, several recommendations were made. These recommendations are currently implemented in the study's center.

  13. Clean Cities Technical Assistance Project (Tiger Teams)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    This two-page fact sheet describes Clean Cities' technical assistance (Tiger Teams) capabilities and projects, both completed and ongoing. Tiger Teams are a critical element of the Clean Cities program, providing on-the-ground consultation to help inform program strategies. The knowledge Tiger Team experts gain from these experiences often helps inform other alternative fuels activities, such as needed research, codes and standards revisions, and new training resources.

  14. Evaluation of aviation-based safety team training in a hospital in The Netherlands.

    PubMed

    De Korne, Dirk F; Van Wijngaarden, Jeroen D H; Van Dyck, Cathy; Hiddema, U Francis; Klazinga, Niek S

    2014-01-01

    The purpose of this paper is to evaluate the implementation of a broad-scale team resource management (TRM) program on safety culture in a Dutch eye hospital, detailing the program's content and procedures. Aviation-based TRM training is recognized as a useful approach to increase patient safety, but little is known about how it affects safety culture. Pre- and post-assessments of the hospitals' safety culture was based on interviews with ophthalmologists, anesthesiologists, residents, nurses, and support staff. Interim observations were made at training sessions and in daily hospital practice. The program consisted of safety audits of processes and (team) activities, interactive classroom training sessions by aviation experts, a flight simulator session, and video recording of team activities with subsequent feedback. Medical professionals considered aviation experts inspiring role models and respected their non-hierarchical external perspective and focus on medical-technical issues. The post-assessment showed that ophthalmologists and other hospital staff had become increasingly aware of safety issues. The multidisciplinary approach promoted social (team) orientation that replaced the former functionally-oriented culture. The number of reported near-incidents greatly increased; the number of wrong-side surgeries stabilized to a minimum after an initial substantial reduction. The study was observational and the hospital's variety of efforts to improve safety culture prevented us from establishing a causal relation between improvement and any one specific intervention. Aviation-based TRM training can be a useful to stimulate safety culture in hospitals. Safety and quality improvements are not single treatment interventions but complex socio-technical interventions. A multidisciplinary system approach and focus on "team" instead of "profession" seems both necessary and difficult in hospital care.

  15. Review of literature and practices for incident management programs : technical report.

    DOT National Transportation Integrated Search

    2016-06-01

    The project team examined project evaluations, best practice summaries, and synthesis documents, and derived a summary of key elements of programs to speed the time to find and clear stalled vehicles and crashes from freeway shoulders and main lanes....

  16. DESIGN OF A TRAP GREASE UPGRADER FOR BIOFUEL PROCESSING - PHASE I

    EPA Science Inventory

    This project provides capstone senior design experience to several teams of engineering undergraduates at Drexel University through the technical and economic evaluation of a trap grease to biodiesel conversion process. The project incorporates two phases: Phase I characteri...

  17. Remediation management of complex sites using an adaptive site management approach.

    PubMed

    Price, John; Spreng, Carl; Hawley, Elisabeth L; Deeb, Rula

    2017-12-15

    Complex sites require a disproportionate amount of resources for environmental remediation and long timeframes to achieve remediation objectives, due to their complex geologic conditions, hydrogeologic conditions, geochemical conditions, contaminant-related conditions, large scale of contamination, and/or non-technical challenges. A recent team of state and federal environmental regulators, federal agency representatives, industry experts, community stakeholders, and academia worked together as an Interstate Technology & Regulatory Council (ITRC) team to compile resources and create new guidance on the remediation management of complex sites. This article summarizes the ITRC team's recommended process for addressing complex sites through an adaptive site management approach. The team provided guidance for site managers and other stakeholders to evaluate site complexities and determine site remediation potential, i.e., whether an adaptive site management approach is warranted. Adaptive site management was described as a comprehensive, flexible approach to iteratively evaluate and adjust the remedial strategy in response to remedy performance. Key aspects of adaptive site management were described, including tools for revising and updating the conceptual site model (CSM), the importance of setting interim objectives to define short-term milestones on the journey to achieving site objectives, establishing a performance model and metrics to evaluate progress towards meeting interim objectives, and comparing actual with predicted progress during scheduled periodic evaluations, and establishing decision criteria for when and how to adapt/modify/revise the remedial strategy in response to remedy performance. Key findings will be published in an ITRC Technical and Regulatory guidance document in 2017 and free training webinars will be conducted. More information is available at www.itrc-web.org. Copyright © 2017 Elsevier Ltd. All rights reserved.

  18. NCMS PWB Surface Finishes Team project summary

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kokas, J.; DeSantis, C.; Wenger, G.

    1996-04-01

    The NCMS PWB Surface Finishes Consortium is just about at the end of the five year program. Dozens of projects related to surface finishes and PWB solder-ability were performed by the team throughout the program, and many of them are listed in this paper. They are listed with a cross reference to where and when a technical paper was presented describing the results of the research. However, due to time and space constraints, this paper can summarize the details of only three of the major research projects accomplished by the team. The first project described is an ``Evaluation of PWBmore » Surface Finishes.`` It describes the solderability, reliability, and wire bondability of numerous surface finishes. The second project outlined is an ``Evaluation of PWB Solderability Test Methods.`` The third project outlined is the ``Development and Evaluation of Organic Solderability Preservatives.``« less

  19. Human Exploration Framework Team: Strategy and Status

    NASA Technical Reports Server (NTRS)

    Muirhead, Brian K.; Sherwood, Brent; Olson, John

    2011-01-01

    Human Exploration Framework Team (HEFT) was formulated to create a decision framework for human space exploration that drives out the knowledge, capabilities and infrastructure NASA needs to send people to explore multiple destinations in the Solar System in an efficient, sustainable way. The specific goal is to generate an initial architecture that can evolve into a long term, enterprise-wide architecture that is the basis for a robust human space flight enterprise. This paper will discuss the initial HEFT activity which focused on starting up the cross-agency team, getting it functioning, developing a comprehensive development and analysis process and conducting multiple iterations of the process. The outcome of this process will be discussed including initial analysis of capabilities and missions for at least two decades, keeping Mars as the ultimate destination. Details are provided on strategies that span a broad technical and programmatic trade space, are analyzed against design reference missions and evaluated against a broad set of figures of merit including affordability, operational complexity, and technical and programmatic risk.

  20. Development of an instrument for the evaluation of advanced life support performance.

    PubMed

    Peltonen, L-M; Peltonen, V; Salanterä, S; Tommila, M

    2017-10-01

    Assessing advanced life support (ALS) competence requires validated instruments. Existing instruments include aspects of technical skills (TS), non-technical skills (NTS) or both, but one instrument for detailed assessment that suits all resuscitation situations is lacking. This study aimed to develop an instrument for the evaluation of the overall ALS performance of the whole team. This instrument development study had four phases. First, we reviewed literature and resuscitation guidelines to explore items to include in the instrument. Thereafter, we interviewed resuscitation team professionals (n = 66), using the critical incident technique, to determine possible additional aspects associated with the performance of ALS. Second, we developed an instrument based on the findings. Third, we used an expert panel (n = 20) to assess the validity of the developed instrument. Finally, we revised the instrument based on the experts' comments and tested it with six experts who evaluated 22 video recorded resuscitations. The final version of the developed instrument had 69 items divided into adherence to guidelines (28 items), clinical decision-making (5 items), workload management (12 items), team behaviour (8 items), information management (6 items), patient integrity and consideration of laymen (4 items) and work routines (6 items). The Cronbach's α values were good, and strong correlations between the overall performance and the instrument were observed. The instrument may be useful for detailed assessment of the team's overall performance, but the numerous items make the use demanding. The instrument is still under development, and more research is needed to determine its psychometric properties. © 2017 The Acta Anaesthesiologica Scandinavica Foundation. Published by John Wiley & Sons Ltd.

  1. Going DEEP: guidelines for building simulation-based team assessments.

    PubMed

    Grand, James A; Pearce, Marina; Rench, Tara A; Chao, Georgia T; Fernandez, Rosemarie; Kozlowski, Steve W J

    2013-05-01

    Whether for team training, research or evaluation, making effective use of simulation-based technologies requires robust, reliable and accurate assessment tools. Extant literature on simulation-based assessment practices has primarily focused on scenario and instructional design; however, relatively little direct guidance has been provided regarding the challenging decisions and fundamental principles related to assessment development and implementation. The objective of this manuscript is to introduce a generalisable assessment framework supplemented by specific guidance on how to construct and ensure valid and reliable simulation-based team assessment tools. The recommendations reflect best practices in assessment and are designed to empower healthcare educators, professionals and researchers with the knowledge to design and employ valid and reliable simulation-based team assessments. Information and actionable recommendations associated with creating assessments of team processes (non-technical 'teamwork' activities) and performance (demonstration of technical proficiency) are presented which provide direct guidance on how to Distinguish the underlying competencies one aims to assess, Elaborate the measures used to capture team member behaviours during simulation activities, Establish the content validity of these measures and Proceduralise the measurement tools in a way that is systematically aligned with the goals of the simulation activity while maintaining methodological rigour (DEEP). The DEEP framework targets fundamental principles and critical activities that are important for effective assessment, and should benefit healthcare educators, professionals and researchers seeking to design or enhance any simulation-based assessment effort.

  2. Effects of physical, technical, and tactical factors on final ladder position in semiprofessional rugby league.

    PubMed

    Gabbett, Tim J

    2014-07-01

    A limitation of most rugby league time-motion studies is that researchers have examined the demands of single teams, with no investigations of all teams in an entire competition. This study investigated the activity profiles and technical and tactical performances of successful and less-successful teams throughout an entire rugby league competition. In total, 185 rugby league players representing 11 teams from a semiprofessional competition participated in this study. Global positioning system analysis was completed across the entire season. Video footage from individual matches was also coded via notational analysis for technical and tactical performance of teams. Trivial to small differences were found among Top 4, Middle 4, and Bottom 4 teams for absolute and relative total distances covered and distances covered at low speeds. Small, nonsignificant differences (P = .054, ES = 0.31) were found between groups for the distance covered sprinting, with Top 4 teams covering greater sprinting distances than Bottom 4 teams. Top 4 teams made more meters in attack and conceded fewer meters in defense than Bottom 4 teams. Bottom 4 teams had a greater percentage of slow play-the-balls in defense than Top 4 teams (74.8% ± 7.3% vs 67.2% ± 8.3%). Middle 4 teams showed the greatest reduction in high-speed running from the first to the second half (-20.4%), while Bottom 4 teams completed 14.3% more high-speed running in the second half than in the first half. These findings demonstrate that a combination of activity profiles and technical and tactical performance are associated with playing success in semiprofessional rugby league players.

  3. Final Environmental Assessment for Proposed Additional Development, Testing Use, and Associated Training at the Technical Evaluation Assessment Monitor Site (TEAMS) at Kirtland Air Force Base, New Mexico

    DTIC Science & Technology

    2015-02-01

    supply, sanitary sewage/wastewater, storm water handling, and communications systems. Solid waste TEAMS Final Environmental Assessment Kirtland...appropriately sanitized prior to being placed back into service. This will ensure safety of the water system. Sanitary Sewer/Wastewater System. Kirtland...AFB does not have its own sewage treatment plant. Instead, the sanitary sewer system of Kirtland AFB transports wastewater to the city of

  4. Users perspectives on interactive distance technology enabling home-based motor training for stroke patients.

    PubMed

    Ehn, Maria; Hansson, Pär; Sjölinder, Marie; Boman, Inga-Lill; Folke, Mia; Sommerfeld, Disa; Borg, Jörgen; Palmcrantz, Susanne

    2015-01-01

    The aim of this work has been to develop a technical support enabling home-based motor training after stroke. The basis for the work plan has been to develop an interactive technical solution supporting three different groups of stroke patients: (1) patients with stroke discharged from hospital with support from neuro team; (2) patients with stroke whose support from neuro team will be phased out and (3) patients living with impaired motor functions long-term. The technology has been developed in close collaboration with end-users using a method earlier evaluated and described [12]. This paper describes the main functions of the developed technology. Further, results from early user-tests with end-users, performed to identify needs for improvements to be carried out during further technical development. The developed technology will be tested further in a pilot study of the safety and, usefulness of the technology when applied as a support for motor training in three different phases of the post-stroke rehabilitation process.

  5. Improving non-technical skills (teamwork) in post-partum haemorrhage: A grouped randomised trial.

    PubMed

    Letchworth, Pippa M; Duffy, Shane P; Phillips, Dan

    2017-10-01

    To determine the effect of a decision support technology on teamwork and associated non-technical (NTS) and technical skills when teams manage post-partum haemorrhage (PPH) in the simulated environment. Multidisciplinary (MDT) maternity teams were taught how to manage post partum haemorrhage. They were randomised to the intervention: using a decision support mobile digital platform or a control group. Each team managed a post-partum simulation, which was recorded and reviewed by assessors. Primary outcome measures to assess teams NTS were the validated Global Assessment of Obstetric Team Performance (GAOTP) and Clinical Teamwork Scale (CTS). Secondary outcome measures were the 'friends and family test', technical skills, and the System Usability Scale (SUS). Sample size estimation was calculated by using 80% power 5% significance two tailed test (p1=85% p2=40%) n=34. 38 teams from August 2014-February 2016, were recruited, technical issues with failure of recording equipment meant 4 teams were excluded from teamwork analysis (1 intervention 3 control). Teamwork improved across all domains with the intervention (using a decision support mobile digital platform) p <0.01. CTS improved between 6.7-16.8% (average 14.2%) and GAOTP between 8.6-17.1% (average 13.5%) for all domains. Using the control group as baseline, the intervention improved teamwork by 25% using CTS and 22% using GAOTP. Fewer technical skills were missed with the intervention (p<0.01). There was no statistical difference in the time technical skills were achieved. Assessors were more likely to recommend intervention teams 87.5% (77/88) than control teams 63.6% (56/88) p<0.01 to their friends or family. The SUS was 'Good' (69) becoming excellently 'Usable' (81.6) over the study period. We report a decision support system, which improved NTS when managing PPH. Lack of teamwork is often cited as the cause of failures in care and we report a usable technology that assists with and improves teamwork during an emergency. Copyright © 2017 Elsevier B.V. All rights reserved.

  6. Project T.E.A.M. (Technical Education Advancement Modules). Fundementals of Workplace Integration.

    ERIC Educational Resources Information Center

    Kraeling, Vicki

    This module is one of a series of instructional guides developed by Project TEAM (Technical Education Advancement Modules), a cooperative demonstration program for high technology training for unemployed, underemployed, and existing industrial employees whose basic technical skills are in need of upgrading. The module is a 27-hour overview course…

  7. Key team physical and technical performance indicators indicative of team quality in the soccer Chinese super league.

    PubMed

    Yang, Gai; Leicht, Anthony S; Lago, Carlos; Gómez, Miguel-Ángel

    2018-01-01

    The aim of this study was to identify the key physical and technical performance variables related to team quality in the Chinese Super League (CSL). Teams' performance variables were collected from 240 matches and analysed via analysis of variance between end-of-season-ranked groups and multinomial logistic regression. Significant physical performance differences between groups were identified for sprinting (top-ranked group vs. upper-middle-ranked group) and total distance covered without possession (upper and upper-middle-ranked groups and lower-ranked group). For technical performance, teams in the top-ranked group exhibited a significantly greater amount of possession in opponent's half, number of entry passes in the final 1/3 of the field and the Penalty Area, and 50-50 challenges than lower-ranked teams. Finally, time of possession increased the probability of a win compared with a draw. The current study identified key performance indicators that differentiated end-season team quality within the CSL.

  8. 77 FR 58526 - Pacific Fishery Management Council; Public Meeting; Work Session To Review Proposed Salmon...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-21

    ... Fishery Management Council; Public Meeting; Work Session To Review Proposed Salmon Methodology Changes...), Commerce. ACTION: Notice of a public meeting. SUMMARY: The Pacific Fishery Management Council's Salmon Technical Team (STT), Scientific and Statistical Committee (SSC) Salmon Subcommittee, and Model Evaluation...

  9. 76 FR 54216 - Pacific Fishery Management Council (Council); Work Session To Review Proposed Salmon Methodology...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-31

    ... Fishery Management Council (Council); Work Session To Review Proposed Salmon Methodology Changes AGENCY.... ACTION: Notice of a public meeting. SUMMARY: The Pacific Fishery Management Council's Salmon Technical Team (STT), Scientific and Statistical Committee (SSC) Salmon Subcommittee, and Model Evaluation...

  10. Examining the Highs and Lows of the Collaborative Relationship Between Technical Assistance Providers and Prevention Implementers.

    PubMed

    Chilenski, Sarah M; Welsh, Janet; Olson, Jonathan; Hoffman, Lesa; Perkins, Daniel F; Feinberg, Mark E

    2018-02-01

    The PROSPER model uses a three-tiered community partnership, university researcher, and Cooperative Extension-based technical assistance system to support the delivery of evidence-based interventions in communities. This study examines the trajectory and predictors of the collaborative relationship between technical assistance providers and community teams across the three phases of organization, implementation, and sustainability. Members of 14 PROmoting School-university-community Partnerships to Enhance Resilience (PROSPER) community teams and directors of local agencies rated communities' levels of readiness and adolescent substance use norms. Technical assistance providers rated their collaborative relationship with their teams at 14 occasions across 4.5 years. Results from mixed models show that levels of collaboration were stable until the sustainability phase, when they increased significantly. Team differences in change were significant during the implementation phase. Community readiness predicted levels of the collaborative relationship over time: high community readiness was associated with a high level of collaboration during organization, but a decline in collaboration during implementation. These results provide a more nuanced understanding of the relationship between technical assistance provision and community prevention teams and lead to recommendations to improve dissemination models to achieve a greater public health impact.

  11. SpaceWire Tiger Team Findings and Suggestions

    NASA Technical Reports Server (NTRS)

    Ishac, Joseph A.

    2011-01-01

    This technical report intends to highlight the key findings and recommendations of the SpaceWire Tiger Team for the CoNNeCT project. It covers findings which are technical in nature, covering design concepts and approaches.

  12. Training situational awareness to reduce surgical errors in the operating room.

    PubMed

    Graafland, M; Schraagen, J M C; Boermeester, M A; Bemelman, W A; Schijven, M P

    2015-01-01

    Surgical errors result from faulty decision-making, misperceptions and the application of suboptimal problem-solving strategies, just as often as they result from technical failure. To date, surgical training curricula have focused mainly on the acquisition of technical skills. The aim of this review was to assess the validity of methods for improving situational awareness in the surgical theatre. A search was conducted in PubMed, Embase, the Cochrane Library and PsycINFO using predefined inclusion criteria, up to June 2014. All study types were considered eligible. The primary endpoint was validity for improving situational awareness in the surgical theatre at individual or team level. Nine articles were considered eligible. These evaluated surgical team crisis training in simulated environments for minimally invasive surgery (4) and open surgery (3), and training courses focused at training non-technical skills (2). Two studies showed that simulation-based surgical team crisis training has construct validity for assessing situational awareness in surgical trainees in minimally invasive surgery. None of the studies showed effectiveness of surgical crisis training on situational awareness in open surgery, whereas one showed face validity of a 2-day non-technical skills training course. To improve safety in the operating theatre, more attention to situational awareness is needed in surgical training. Few structured curricula have been developed and validation research remains limited. Strategies to improve situational awareness can be adopted from other industries. © 2014 BJS Society Ltd. Published by John Wiley & Sons Ltd.

  13. Office for Analysis and Evaluation of Operational Data 1996 annual report. Volume 10, Number 1: Reactors

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-12-01

    This annual report of the US Nuclear Regulatory Commission`s Office for Analysis and Evaluation of Operational Data (AEOD) describes activities conducted during 1996. The report is published in three parts. NUREG-1272, Vol. 10, No. 1, covers power reactors and presents an overview of the operating experience of the nuclear power industry from the NRC perspective, including comments about trends of some key performance measures. The report also includes the principal findings and issues identified in AEOD studies over the past year and summarizes information from such sources as licensee event reports and reports to the NRC`s Operations Center. NUREG-1272, Vol.more » 10, No. 2, covers nuclear materials and presents a review of the events and concerns during 1996 associated with the use of licensed material in nonreactor applications, such as personnel overexposures and medical misadministrations. Both reports also contain a discussion of the Incident Investigation Team program and summarize both the Incident Investigation Team and Augmented Inspection Team reports. Each volume contains a list of the AEOD reports issued from CY 1980 through 1996. NUREG-1272, Vol. 10, No. 3, covers technical training and presents the activities of the Technical Training Center in support of the NRC`s mission in 1996.« less

  14. Overlapping of duties and technical autonomy among nurses of the Family Health Strategy.

    PubMed

    Feliciano, Katia Virginia de Oliveira; Kovacs, Maria Helena; Sarinho, Silvia Wanick

    2010-06-01

    To understand how Estratégia Saúde da Família (Family Health Strategy) nurses experience the overlapping of duties and building of technical autonomy. This was a qualitative study performed with 22 nurses, in the city of Recife, Northeastern Brazil, between August 2005 and November 2006. Based on management evaluation (geographic access; conflicts in the team, between team and district and between team and community; and public violence in the area), four teams were selected in each of the six health districts. Semi-structured interviews were conducted. The main themes in the interview guide were about work expectations and relevance, its organization and process, and feelings towards these practices. The results were interpreted under the perspective of burnout. The nurses' opinion on the excessive number of families, insufficient organizational support and pressures from user demands that had not been met was recurrent. Overlapping of health care and management caused work overload, creating anxiety, impotence, frustration and the feeling of being treated unfairly when tasks were divided among team members. The clinical dimension of practice led to a feeling of insecurity of a technical and ethical nature, in addition to the satisfaction for the power and prestige achieved by the professional category. Specialized medical training represented an obstacle to autonomy and responsibility becoming interdependent. Stress, dissatisfaction, becoming physically and mentally ill, recognition of the relevance of work and importance of one's performance, and low work involvement were reported. In view of the lack of expectation of changes in the short term, the overlapping of low professional satisfaction and work overload causes negative attitudes, indicating the importance of health promotion to increase the possibility of influencing and changing work conditions.

  15. The Strength of the Strongest Ties in Collaborative Problem Solving

    NASA Astrophysics Data System (ADS)

    de Montjoye, Yves-Alexandre; Stopczynski, Arkadiusz; Shmueli, Erez; Pentland, Alex; Lehmann, Sune

    2014-06-01

    Complex problem solving in science, engineering, and business has become a highly collaborative endeavor. Teams of scientists or engineers collaborate on projects using their social networks to gather new ideas and feedback. Here we bridge the literature on team performance and information networks by studying teams' problem solving abilities as a function of both their within-team networks and their members' extended networks. We show that, while an assigned team's performance is strongly correlated with its networks of expressive and instrumental ties, only the strongest ties in both networks have an effect on performance. Both networks of strong ties explain more of the variance than other factors, such as measured or self-evaluated technical competencies, or the personalities of the team members. In fact, the inclusion of the network of strong ties renders these factors non-significant in the statistical analysis. Our results have consequences for the organization of teams of scientists, engineers, and other knowledge workers tackling today's most complex problems.

  16. The strength of the strongest ties in collaborative problem solving.

    PubMed

    de Montjoye, Yves-Alexandre; Stopczynski, Arkadiusz; Shmueli, Erez; Pentland, Alex; Lehmann, Sune

    2014-06-20

    Complex problem solving in science, engineering, and business has become a highly collaborative endeavor. Teams of scientists or engineers collaborate on projects using their social networks to gather new ideas and feedback. Here we bridge the literature on team performance and information networks by studying teams' problem solving abilities as a function of both their within-team networks and their members' extended networks. We show that, while an assigned team's performance is strongly correlated with its networks of expressive and instrumental ties, only the strongest ties in both networks have an effect on performance. Both networks of strong ties explain more of the variance than other factors, such as measured or self-evaluated technical competencies, or the personalities of the team members. In fact, the inclusion of the network of strong ties renders these factors non-significant in the statistical analysis. Our results have consequences for the organization of teams of scientists, engineers, and other knowledge workers tackling today's most complex problems.

  17. Air Force Information Publishing Service 902-S Procurement Program

    DTIC Science & Technology

    1993-03-22

    34- ^ D. 0. Cooks Director 65 This J>age was- left out of original document U» DEPARTMENT OF THE NAVY THE ASSISTAMT SECRETARY Of THC MAW (Wwwth...including Technical and’Management Factor and Sob- Factor personnel, and Cost Factor Evaluation Team; CBD advertising; Bidden Conference; and

  18. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Price, Laura L.; Barela, Amanda Crystal; Walkow, Walter M.

    An Evaluation and Screening team supporting the Fuel Cycle Technologies Program Office of the United States Department of Energy, Office of Nuclear Energy is conducting an evaluation and screening of a comprehensive set of fuel cycle options. These options have been assigned to one of 40 evaluation groups, each of which has a representative fuel cycle option [Todosow 2013]. A Fuel Cycle Data Package System Datasheet has been prepared for each representative fuel cycle option to ensure that the technical information used in the evaluation is high-quality and traceable [Kim, et al., 2013]. The information contained in the Fuel Cyclemore » Data Packages has been entered into the Nuclear Fuel Cycle Options Catalog at Sandia National Laboratories so that it is accessible by the evaluation and screening team and other interested parties. In addition, an independent team at Savannah River National Laboratory has verified that the information has been entered into the catalog correctly. This report documents that the 40 representative fuel cycle options have been entered into the Catalog, and that the data entered into the catalog for the 40 representative options has been entered correctly.« less

  19. [Multidimensional assessment of public health care services for adolescents in Chile].

    PubMed

    Williams, Catalina de T; Poblete, Fernando A; Baldrich, Francisca A

    2012-09-01

    Adolescents are an especially vulnerable age group in terms of behavioral issues and require skilled teams in health centers. To assess the quality of health services provided to teenage users in Primary Health Care. A study of multiple cases was carried out in two family health centers in Puente Alto, Chile. Health services delivered to adolescents were evaluated from the provider's perspective, through qualitative design of focus groups and interviews to the care teams at each centre. For technical quality, comparing electronic records of two tracer conditions (prenatal care and depression) with technical standards established by Delphi methodology and from teenage users perspective, through a survey of service satisfaction. In both centers, providers perceived a lack of training in adolescent care, a deficient preventive approach and a limited access to care. The technical evaluation showed an inappropriate recording of both tracer conditions. The instrument used to assess user satisfaction survey was reliable and showed that the best perceived issue was medical care and treatment, and the least perceived, was the access to the services. Professionals working in these health care facilities, feel unprepared to provide comprehensive approach to adolescents. The surveyed teenagers complained of limited access to care. Therefore this age group continues to be as a non-priority group for health care.

  20. Technology evaluation, assessment, modeling, and simulation: the TEAMS capability

    NASA Astrophysics Data System (ADS)

    Holland, Orgal T.; Stiegler, Robert L.

    1998-08-01

    The United States Marine Corps' Technology Evaluation, Assessment, Modeling and Simulation (TEAMS) capability, located at the Naval Surface Warfare Center in Dahlgren Virginia, provides an environment for detailed test, evaluation, and assessment of live and simulated sensor and sensor-to-shooter systems for the joint warfare community. Frequent use of modeling and simulation allows for cost effective testing, bench-marking, and evaluation of various levels of sensors and sensor-to-shooter engagements. Interconnectivity to live, instrumented equipment operating in real battle space environments and to remote modeling and simulation facilities participating in advanced distributed simulations (ADS) exercises is available to support a wide- range of situational assessment requirements. TEAMS provides a valuable resource for a variety of users. Engineers, analysts, and other technology developers can use TEAMS to evaluate, assess and analyze tactical relevant phenomenological data on tactical situations. Expeditionary warfare and USMC concept developers can use the facility to support and execute advanced warfighting experiments (AWE) to better assess operational maneuver from the sea (OMFTS) concepts, doctrines, and technology developments. Developers can use the facility to support sensor system hardware, software and algorithm development as well as combat development, acquisition, and engineering processes. Test and evaluation specialists can use the facility to plan, assess, and augment their processes. This paper presents an overview of the TEAMS capability and focuses specifically on the technical challenges associated with the integration of live sensor hardware into a synthetic environment and how those challenges are being met. Existing sensors, recent experiments and facility specifications are featured.

  1. Hybrid simulation: bringing motivation to the art of teamwork training in the operating room.

    PubMed

    Kjellin, A; Hedman, L; Escher, C; Felländer-Tsai, L

    2014-12-01

    Crew resource management-based operating room team training will be an evident part of future surgical training. Hybrid simulation in the operating room enables the opportunity for trainees to perform higher fidelity training of technical and non-technical skills in a realistic context. We focus on situational motivation and self-efficacy, two important factors for optimal learning in light of a prototype course for teams of residents in surgery and anesthesiology and nurses. Authentic operating room teams consisting of residents in anesthesia (n = 2), anesthesia nurses (n = 3), residents in surgery (n = 2), and scrub nurses (n = 6) were, during a one-day course, exposed to four different scenarios. Their situational motivation was self-assessed (ranging from 1 = does not correspond at all to 7 = corresponds exactly) immediately after training, and their self-efficacy (graded from 1 to 7) before and after training. Training was performed in a mock-up operating theater equipped with a hybrid patient simulator (SimMan 3G; Laerdal) and a laparoscopic simulator (Lap Mentor Express; Simbionix). The functionality of the systematic hybrid procedure simulation scenario was evaluated by an exit questionnaire (graded from 1 = disagree entirely to 5 = agree completely). The trainees were mostly intrinsically motivated, engaged for their own sake, and had a rather great degree of self-determination toward the training situation. Self-efficacy among the team members improved significantly from 4 to 6 (median). Overall evaluation showed very good result with a median grading of 5. We conclude that hybrid simulation is feasible and has the possibility to train an authentic operating team in order to improve individual motivation and confidence. © The Finnish Surgical Society 2014.

  2. Technical match characteristics and influence of body anthropometry on playing performance in male elite team handball.

    PubMed

    Michalsik, Lars Bojsen; Madsen, Klavs; Aagaard, Per

    2015-02-01

    Modern team handball match-play imposes substantial physical and technical demands on elite players. However, only limited knowledge seems to exist about the specific working requirements in elite team handball. Thus, the purpose of this study was to examine the physical demands imposed on male elite team handball players in relation to playing position and body anthropometry. Based on continuous video recording of individual players during elite team handball match-play (62 tournament games, ∼4 players per game), computerized technical match analysis was performed in male elite team handball players along with anthropometric measurements over a 6 season time span. Technical match activities were distributed in 6 major types of playing actions (shots, breakthroughs, fast breaks, tackles, technical errors, and defense errors) and further divided into various subcategories (e.g., hard or light tackles, type of shot, claspings, screenings, and blockings). Players showed 36.9 ± 13.1 (group mean ± SD) high-intense technical playing actions per match with a mean total effective playing time of 53.85 ± 5.87 minutes. In offense, each player performed 6.0 ± 5.2 fast breaks, received 34.5 ± 21.3 tackles in total, and performed in defense 3.7 ± 3.5 blockings, 3.9 ± 3.0 claspings, and 5.8 ± 3.6 hard tackles. Wing players (84.5 ± 5.8 kg, 184.9 ± 5.7 cm) were less heavy and smaller (p < 0.001) than backcourt players (94.7 ± 7.1 kg, 191.9 ± 5.4 cm) and pivots (99.4 ± 6.2 kg, 194.8 ± 3.6 cm). In conclusion, modern male elite team handball match-play is characterized by a high number of short-term, high-intense intermittent technical playing actions. Indications of technical fatigue were observed. Physical demands differed between playing positions with wing players performing more fast breaks and less physical confrontations with opponent players than backcourt players and pivots. Body anthropometry seemed to have an important influence on playing performance because it is highly related to playing positions. The present observations suggest that male elite team handball players should implement more position-specific training regimens, while also focusing on anaerobic training and strength training.

  3. Models and Methods for Adaptive Management of Individual and Team-Based Training Using a Simulator

    NASA Astrophysics Data System (ADS)

    Lisitsyna, L. S.; Smetyuh, N. P.; Golikov, S. P.

    2017-05-01

    Research of adaptive individual and team-based training has been analyzed and helped find out that both in Russia and abroad, individual and team-based training and retraining of AASTM operators usually includes: production training, training of general computer and office equipment skills, simulator training including virtual simulators which use computers to simulate real-world manufacturing situation, and, as a rule, the evaluation of AASTM operators’ knowledge determined by completeness and adequacy of their actions under the simulated conditions. Such approach to training and re-training of AASTM operators stipulates only technical training of operators and testing their knowledge based on assessing their actions in a simulated environment.

  4. An overview and guide: planning instructional radio.

    PubMed

    Imhoof, M

    1984-03-01

    Successful instructional radio projects require both comprehensive and complex planning. The instructional radio planning team needs to have knowledge and capabilities in several technical, social, and educational areas. Among other skills, the team must understand radio, curriculum design, the subject matter being taught, research and evaluation, and the environment in which the project operates. Once a basic approach to educational planning has been selected and broad educational goals set, radio may be selected as a cost effective means of achieving some of the goals. Assuming radio is a wise choice, there are still several factors which must be analyzed by a team member who is a radio specialist. The most obvious consideration is the inventory and evaluation of the facilities: studios; broadcast, recording, and transmission equipment; classroom radios; and so on. Capabilities of broadcast personnel are another consideration. Initial radio lessons need to teach the learners how to listen to the radio if they have no previous experience with institutional radio broadcasts. A captive, inschool audience ready to listen to radio instructions requires a different use of the medium than a noncaptive audience. With the noncaptive audience, the educational broadcaster must compete with entertaining choices from other media and popular activities and pastimes of the community. The most complex knowledge and analysis required in planning instructional radio concerns the relationship of the content to the medium. Environmental factors are important in planning educational programs. The physical environment may present several constraints on the learning experience and the use of radio. The most obvious is the effect of climate and terrain on the quality of radio reception. The physical environment is easily studied through experience in the target area, but this knowledge plays a significant role in designing effective learning materials for specific learners. Social activities utilized in broadcasts which are contrary to the learners' experience will at best seem strange and at worst be incomprehensible. Curriculum development in an instructional radio project adds more complexity to the planner's task. The most important information needed is whether a new curriculum is to be developed or whether the existing curriculum is to be adapted for radio. Another major analysis task is relating the curriculum to the medium. The project planning team needs to understand the research aims and evaluation methods in instructional radio projects. Sometimes an outside evaluation specialist or team is employed, but in many projects the planning team is responsible for implementing the research design, carrying out the development activities, gathering data, and evaluating the project. Subject matter testing is another technical area of expertise needed by the project team.

  5. Recent Experiences of the NASA Engineering and Safety Center (NESC) Guidance Navigation and Control (GN and C) Technical Discipline Team (TDT)

    NASA Technical Reports Server (NTRS)

    Dennehy, Cornelius J.

    2011-01-01

    The NASA Engineering and Safety Center (NESC) is an independently funded NASA Program whose dedicated team of technical experts provides objective engineering and safety assessments of critical, high risk projects. NESC's strength is rooted in the diverse perspectives and broad knowledge base that add value to its products, affording customers a responsive, alternate path for assessing and preventing technical problems while protecting vital human and national resources. The Guidance Navigation and Control (GN&C) Technical Discipline Team (TDT) is one of fifteen such discipline-focused teams within the NESC organization. The TDT membership is composed of GN&C specialists from across NASA and its partner organizations in other government agencies, industry, national laboratories, and universities. This paper will briefly define the vision, mission, and purpose of the NESC organization. The role of the GN&C TDT will then be described in detail along with an overview of how this team operates and engages in its objective engineering and safety assessments of critical NASA.

  6. Development of a rapid response plan for intraoperative emergencies: the Circulate, Scrub, and Technical Assistance Team.

    PubMed

    Earle, David; Betti, Diane; Scala, Emilia

    2017-01-01

    Unplanned intraoperative events are inevitable and cause stress and inefficiency among staff. We believe that developing a technical rapid response team with explicitly defined, narrow roles would reduce the amount of chaos during such emergencies. This article provides a detailed description of the development and implementation of such a program. In-situ simulation of an intraoperative emergency was used for a formal assessment of the current practice. Debriefing sessions identified areas of improvement and solicited solutions. A multidisciplinary working group then developed and implemented the technical rapid response team based on the needs assessment. The program was designed to create a Circulating, Scrubbing, and Technical Assistance Team that helps with equipment, supplies, anesthesia, and communication. We anticipate the program will foster a culture of safety, and promote positive relationships and attitudes of the entire multidisciplinary team. In the future, research regarding patient outcomes and staff satisfaction and safety attitudes may help provide objective evidence of the benefits of the program. Copyright © 2016 Elsevier Inc. All rights reserved.

  7. Printing system perceptual-based gloss and gloss uniformity standard (INCITS W1.1)

    NASA Astrophysics Data System (ADS)

    Ng, Yee S.; Cui, Luke C.; Kuo, Chung-Hui; Maggard, Eric; Mashtare, Dale; Morris, Peter; Viola, Michael

    2003-12-01

    To address the standarization issues of perceptually based image quality for printing systems, ISO/IEC JTC1/SC28, the standarization committee for office equipment charactered the W1.1 project with the responsibiltiy of drafting a proposal for an international standard for the evaluation of printed image quality. One of the W1.1 task teams is charactered to address the issue of 'Gloss and Gloss Uniformity". This paper summarizes the current status and technical progress of this ad hoc team in 2003.

  8. Personality traits and virtual reality performance.

    PubMed

    Rosenthal, Rachel; Schäfer, Juliane; Hoffmann, Henry; Vitz, Martina; Oertli, Daniel; Hahnloser, Dieter

    2013-01-01

    Surgeons' personalities have been described as different from those of the general population, but this was based on small descriptive studies limited by the choice of evaluation instrument. Furthermore, although the importance of the human factor in team performance has been recognized, the effect of personality traits on technical performance is unknown. This study aimed to compare surgical residents' personality traits with those of the general population and to evaluate whether an association exists between their personality traits and technical performance using a virtual reality (VR) laparoscopy simulator. In this study, 95 participants (54 residents with basic, 29 with intermediate laparoscopic experience, and 12 students) underwent personality assessment using the NEO-Five Factor Inventory and performed five VR tasks of the Lap Mentor™ basic tasks module. The residents' personality traits were compared with those of the general population, and the association between VR performance and personality traits was investigated. Surgical residents showed personality traits different from those of the general population, demonstrating lower neuroticism, higher extraversion and conscientiousness, and male residents showed greater openness. In the multivariable analysis, adjusted for gender and surgical experience, none of the personality traits was found to be an independent predictor of technical performance. Surgical residents present distinct personality traits that differ from those of the general population. These traits were not found to be associated with technical performance in a virtual environment. The traits may, however, play an important role in team performance, which in turn is highly relevant for optimal surgical performance.

  9. Identifying and training non-technical skills for teams in acute medicine

    PubMed Central

    Flin, R; Maran, N

    2004-01-01

    The aviation domain provides a better analogy for the "temporary" teams that are found in acute medical specialities than industrial or military teamwork research based on established teams. Crew resource management (CRM) training, which emphasises portable skills (for whatever crew a pilot is rostered to on a given flight), has been recognised to have potential application in medicine, especially for teams in the operating theatre, intensive care unit, and emergency room. Drawing on research from aviation psychology that produced the behavioural marker system NOTECHS for rating European pilots' non-technical skills for teamwork on the flightdeck, this paper outlines the Anaesthetists Non-Technical Skills behavioural rating system for anaesthetists working in operating theatre teams. This taxonomy was used as the design basis for a training course, Crisis Avoidance Resource Management for Anaesthetists used to develop these skills, based in an operating theatre simulator. Further developments of this training programme for teams in emergency medicine are outlined. PMID:15465960

  10. Independent Technical Review of the X-740 Groundwater Remedy, Portsmouth, Ohio: Technical Evaluation and Recommendations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Looney, B.; Rhia, B.; Jackson, D.

    2010-04-30

    Two major remedial campaigns have been applied to a plume of trichloroethene (TCE) contaminated groundwater near the former X-740 facility at the Portsmouth Gaseous Diffusion Plant in Piketon Ohio. The two selected technologies, phytoremediation using a stand of hybrid poplar trees from 1999-2007 and in situ chemical oxidation using modified Fenton's Reagent from 2008-2009, have proven ineffective in achieving remedial action objectives (RAOs). The 'poor' performance of these technologies is a direct result of site specific conditions and the local contaminant hydrogeology. Key among these challenges is the highly heterogeneous subsurface geology with a thin contaminated aquifer zone (the Gallia)more » - the behavior of the contamination in the Gallia is currently dominated by slow release of TCE from the clay of the overlying Minford formation, from the sandstone of the underlying Berea formation, and from clayey layers within the Gallia itself. In response to the remediation challenges for the X-740 plume, the Portsmouth team (including the US Department of Energy (DOE), the site contractor (CDM), and the Ohio Environmental Protection Agency (OEPA)) is evaluating the feasibility of remediation at this site and identifying specific alternatives that are well matched to site conditions and that would maximize the potential for achieving RAOs. To support this evaluation, the DOE Office of Groundwater and Soil Remediation (EM-32) assembled a team of experts to serve as a resource and provide input and recommendations to Portsmouth. Despite the challenging site conditions and the failure of the previous two remediation campaigns to adequately move the site toward RAOs, the review team was unanimous in the conclusion that an effective combination of cost effective technologies can be identified. Further, the team expressed optimism that RAOs can be achieved if realistic timeframes are accepted by all parties. The initial efforts of the review team focused on reviewing the site history and data and organizing the information into a conceptual model and findings to assist in evaluating the potential of alternative remediation technologies. Examples of the key conceptual findings of the EM-32 review team were: (1) The Gallia represents the most practical target for deployment of in situ remediation treatment reagents - injection/extraction focused in this zone would provide maximum lateral impacts with minimal potential risk of failure or adverse collateral impacts. (2) The slow release of TCE from clay and sandstone into the Gallia represent a long term source of TCE that can re-contaminate the Gallia in the future - technologies that effectively treat the permeable portions of the Gallia, but do not leave residual treatment capacity in the system are unlikely to achieve long term remedial action objectives. CDM, the site contractor, provided important and useful information documenting the status and preliminary results of the on-site technology alternative evaluation. In the CDM evaluation, potential technologies were either retained (or screened out) in two preliminary evaluation phases and a detailed evaluation was performed on the five alternatives that were retained into the final 'detailed analysis' phase. The five alternatives that were included in the detailed analysis were: (1) hydraulic fracturing with EHC (a solid bioremediation amendment), (2) enhanced anaerobic bioremediation, (3) in situ chemical oxidation, (4) electrical resistance heating, and (5) reactive barriers. In several cases, two or three variants were separately evaluated. The review team found the CDM effort to be generally credible and reasonable. Thus, the review team focused on providing additional considerations and inputs to Portsmouth and on amending and refining the alternatives in ways that might improve performance and/or reduce costs. The Department of Energy Portsmouth Paducah Project Office requested assistance from Department of Energy Office of Environmental Management (EM-32) to provide an independent technical panel to review previous and ongoing remedial activities designed to address TCE contamination in groundwater at X-740. In 1999, a corrective action was implemented at X-740 to address contamination in the groundwater. The DOE planted poplar trees over 2.6 acres of the groundwater plume. After several years of groundwater monitoring, the results indicated that the benefits of phytoremediation were limited and insufficient to meet remedial objectives. In 2007, an alternative remedial strategy based on in situ oxidative treatment was negotiated with Ohio EPA. During FY2008, three treatment phases of chemical oxidation were completed. The general charter for the independent technical review team is to review the results of s previous and ongoing remedial actions to determine whether the current strategy will be effective in meeting the end points specified in the regulatory work plan.« less

  11. Risk assessment analysis of the future technical unit dedicated to the evaluation and treatment of motor disabilities.

    PubMed

    Grelier, S; Thetio, M; Quentin, V; Achache, V; Sanchez, N; Leroux, V; Durand, E; Pequignot, R

    2011-03-01

    The National Hospital of Saint Maurice (HNSM) for Physical Medicine and Rehabilitation aims at strengthening its position as a pivot rehabilitation and physical therapy center. The opening in 2011 of a new unit for the evaluation and treatment of motor disabilities meets this objective. This project includes several parts: clinical, financial, architectural, organizational, applied clinical research as well as dealing with medical equipments and information system. This study focuses on the risk assessment of this future technical unit. This study was conducted by a group of professionals working for the hospital. It started with the design of a functional model to better comprehend the system to be analyzed. Risk assessment consists in confronting this functional model to a list of dangers in order to determine the vulnerable areas of the system. Then the team designed some scenarios to identify the causes, securities barriers and consequences in order to rank the risks. The analysis targeted various dangers, e.g. political, strategic, financial, economical, marketing, clinical and operational. The team identified more than 70 risky scenarios. For 75% of them the criticality level was deemed initially tolerable and under control or unacceptable. The implementation of an action plan for reducing the level of risks before opening this technical unit brought the system down to an acceptable level at 66%. A year prior to opening this technical unit for the evaluation and treatment of motor disabilities, conducting this preliminary risk assessment, with its exhaustive and rigorous methodology, enabled the concerned professionals to work together around an action plan for reducing the risks. 2011 Elsevier Masson SAS. All rights reserved.

  12. Predictors of Attitudes Toward Non-Technical Skills in Farming.

    PubMed

    Irwin, Amy; Poots, Jill

    2018-01-01

    Farming is a high-risk sector with up to 170,000 worldwide fatalities reported per year; it is therefore vital to identify methods of mitigating the dangers of this industry. Research within high-risk industries, such as aviation, shipping, and agriculture, has identified the importance of non-technical skills (NTS) in maintaining effective, safe performance and reducing error and injury. However, there is a lack of research evaluating factors that may contribute to NTS attitudes and behaviors. As a first step to address this literature gap, the current study evaluated a range of individual and environmental factors as potential predictors of attitudes toward NTS in agriculture. A sample of 170 farmers from within the United Kingdom and Ireland were surveyed using an online questionnaire. The questionnaire included measures of personality, stress, attitudes toward safety (safety climate, motivation, and risk), environmental stressors (workload, work-life imbalance), and non-technical skills (team and lone worker). Attitudes toward safety climate, compliance, and motivation showed a significant association with both team-based and lone worker NTS. Conscientiousness correlated positively with the majority of the NTS elements. Multiple regression analysis indicated neuroticism and conscientiousness demonstrated capacity to predict NTS attitudes. Concerns about costs and equipment, attitudes toward safety climate, and safety motivation were also found to be significant predictors of NTS attitudes. The results indicate the utility of individual characteristics and environmental factors when predicting farming NTS attitudes. As a result, these elements could be important when evaluating engagement with NTS and developing NTS training initiatives in agriculture.

  13. An Inservice Staff Development Program for Vocational Teachers Working with Disadvantaged Students.

    ERIC Educational Resources Information Center

    Wircenski, Jerry L.; Just, David

    1984-01-01

    To serve the inservice needs of vocational teachers of the disadvantaged, an instructional resource team visited area vocational-technical schools in Pennsylvania weekly for 10 weeks. Summative evaluation showed that a majority of the 42 teachers serving 280 students received assistance with resource identification, diagnosis, and curriculum and…

  14. Development and Technical Characteristics of a Team Decision-Making Assessment Tool: Decision Observation, Recording, and Analysis (DORA)

    ERIC Educational Resources Information Center

    Algozzine, Bob; Newton, J. Stephen; Horner, Robert H.; Todd, Anne W.; Algozzine, Kate

    2012-01-01

    Problem solving is fundamental to psychoeducational assessment practices and generally grounded in activities related to identifying problems, developing and refining hypotheses, generating solutions, developing and implementing actions, and evaluating outcomes. While the process is central to response-to-intervention practices as well, little…

  15. An Integrated Parent-Teacher-Related Service Team Approach to Communication Intervention. Final Report.

    ERIC Educational Resources Information Center

    Stremel, Kathleen; Wilson, Rebecca

    This final report describes a federally funded 3-year project for integrating related services within educational objectives for children (ages 3-10) with dual vision and hearing impairments. A Training-Utilization model of inservice training and technical assistance was developed, implemented, and evaluated to address the communication needs of…

  16. Selection of Technical Communication Concepts for Integration into an Accounting Information Systems Course: A WAC Case Study.

    ERIC Educational Resources Information Center

    Gelinas, Ulric J., Jr.; Rama, D. V.; Skelton, Terrance M.

    1997-01-01

    Profiles a writing-across-the-curriculum project in an accountancy program. Notes that the team's collaborative process produced three critical planning decisions: (1) establishing "fitness-for-use" for evaluating student communications; (2) selecting only those forms of communication used in accountancy; and (3) teaching only those…

  17. KSC-2011-7245

    NASA Image and Video Library

    2011-10-04

    CAPE CANAVERAL, Fla. -- NASA managers at NASA's Kennedy Space Center in Florida show off the Florida Project of the Year trophies that the crawlerway system evaluation team received from the American Society of Civil Engineers (ASCE). From left are Michael Benik, director of Center Operations; Pepper Phillips, manager of the 21st Century Ground Systems Program Office; and Russell Romanella, associate director for Engineering and Technical Operations. The Cape Canaveral branch of the ASCE nominated the team for its project, the Crawlerway Evaluation to Support a Heavy-Lift Program. The crawlerway is a 130-foot-wide, specialty-built roadway between Kennedy's Vehicle Assembly Building (VAB), where rockets and spacecraft are prepared for flight, and Launch Pad 39A and 39B. The team's more than two-year evaluation confirmed the crawlerway system would be able to support the weight of moving the agency's future heavy-lift rockets and potential commercial vehicles from the VAB to the launch pads. The award honors the team's outstanding engineering efforts in research, design, construction and management, recognizing the complexity of multi-agency coordination and cost-effective engineering advances. For more information on the American Society of Civil Engineers, visit: http://www.asce.org. Photo credit: NASA/Kim Shiflett

  18. Surgical Crisis Management Skills Training and Assessment

    PubMed Central

    Moorthy, Krishna; Munz, Yaron; Forrest, Damien; Pandey, Vikas; Undre, Shabnam; Vincent, Charles; Darzi, Ara

    2006-01-01

    Background: Intraoperative surgical crisis management is learned in an unstructured manner. In aviation, simulation training allows aircrews to coordinate and standardize recovery strategies. Our aim was to develop a surgical crisis simulation and evaluate its feasibility, realism, and validity of the measures used to assess performance. Methods: Surgical trainees were exposed to a bleeding crisis in a simulated operating theater. Assessment of performance consisted of a trainee’s technical ability to control the bleeding and of their team/human factors skills. This assessment was performed in a blinded manner by 2 surgeons and one human factors expert. Other measures consisted of time measures such as time to diagnose the bleeding (TD), inform team members (TT), achieve control (TC), and close the laceration (TL). Blood loss was used as a surrogate outcome measures. Results: There were considerable variations within both senior (n = 10) and junior (n = 10) trainees for technical and team skills. However, while the senior trainees scored higher than the juniors for technical skills (P = 0.001), there were no differences in human factors skills. There were also significant differences between the 2 groups for TD (P = 0.01), TC (P = 0.001), and TL (0.001). The blood loss was higher in the junior group. Conclusions: We have described the development of a novel simulated setting for the training of crisis management skills and the variability in performance both in between and within the 2 groups. PMID:16794399

  19. Introduction of the non-technical skills for surgeons (NOTSS) system in a Japanese cancer center.

    PubMed

    Tsuburaya, Akira; Soma, Takahiro; Yoshikawa, Takaki; Cho, Haruhiko; Miki, Tamotsu; Uramatsu, Masashi; Fujisawa, Yoshikazu; Youngson, George; Yule, Steven

    2016-12-01

    Non-technical skills rating systems, which are designed to support surgical performance, have been introduced worldwide, but not officially in Japan. We performed a pilot study to evaluate the "non-technical skills for surgeons" (NOTSS) rating system in a major Japanese cancer center. Upper gastrointestinal surgeons were selected as trainers or trainees. The trainers attended a master-class on NOTSS, which included simulated demo-videos, to promote consistency across the assessments. The trainers thereafter commenced observing the trainees and whole teams, utilizing the NOTSS and "observational teamwork assessment for surgery" (OTAS) rating systems, before and after their education. Four trainers and six trainees were involved in this study. Test scores for understanding human factors and the NOTSS system were 5.89 ± 1.69 and 8.00 ± 1.32 before and after the e-learning, respectively (mean ± SD, p = 0.010). The OTAS scores for the whole team improved significantly after the trainees' education in five out of nine stages (p < 0.05). There were no differences in the NOTSS scores before and after education, with a small improvement in the total scores for the "teamwork and communication" and "leadership" categories. These findings demonstrate that implementing the NOTSS system is feasible in Japan. Education of both surgical trainers and trainees would contribute to better team performance.

  20. One leg lateral jumps - a new test for team players evaluation.

    PubMed

    Taboga, P; Sepulcri, L; Lazzer, S; De Conti, D; Di Prampero, P E

    2013-10-01

    We assessed the subject's capacity to accelerate himself laterally in monopodalic support, a crucial ability in several team sports, on 22 athletes, during series of 10 subsequent jumps, between two force platforms at predetermined distance. Vertical and horizontal accelerations of the Centre of Mass (CM), contact and flight times were measured by means of force platforms and the Optojump-System®. Individual mean horizontal and vertical powers and their sum (total power) ranged between 7 and 14.5 W/kg. "Push angle", i.e., the angle with the horizontal along which the vectorial sum of all forces is aligned, was calculated from the ratio between vertical and horizontal accelerations: it varied between 38.7 and 49.4 deg and was taken to express the subject technical ability. The horizontal acceleration of CM, indirectly estimated as a function of subject's mass, contact and flight times, was essentially equal to that obtained from force platforms data. Since the vertical displacement can be easily obtained from flight and contact times, this allowed us to assess the Push angle from Optojump data only. The power developed during a standard vertical jump was rather highly correlated with that developed during the lateral jumps for right (R=0.80, N.=12) and left limb (R=0.72, N.=12), but not with the push angle for right (R=0.31, N.=12) and left limb (R=-0.43, N.=12). Hence standard tests cannot be utilised to assess technical ability. Lateral jumps test allows the coach to evaluate separately maximal muscular power and technical ability of the athlete, thus appropriately directing the training program: the optimum, for a team-sport player being high power and low push-angle, that is: being "powerful" and "efficient".

  1. [Platforms are needed for innovative basic research in ophthalmology].

    PubMed

    Wang, Yi-qiang

    2012-07-01

    Basic research poses the cornerstone of technical innovation in all lines including medical sciences. Currently, there are shortages of professional scientists as well as technical supporting teams and facilities in the field of basic research of ophthalmology and visual science in China. Evaluation system and personnel policies are not supportive for innovative but high-risk-of-failure research projects. Discussion of reasons and possible solutions are given here to address these problems, aiming at promoting buildup of platforms hosting novel and important basic research in eye science in this country.

  2. Factors that influence the non-technical skills performance of scrub nurses: a prospective study.

    PubMed

    Kang, Evelyn; Massey, Debbie; Gillespie, Brigid M

    2015-12-01

    To identify and describe the factors that impact on the performance of scrub nurses' non-technical skills performance during the intra-operative phase of surgery. Non-technical skills have been identified as important precursors to errors in the operating room. However, few studies have investigated factors influencing non-technical skills of scrub nurses. Prospective observational study. Structured observations were performed on a sample of 182 surgical procedures across eight specialities by two trained observers from August 2012-April 2013 at two hospital sites. Participants were purposively selected scrub nurses. Bivariate correlations and a multiple linear regression model were used to identify associations among length of surgery, patients' acuity using the American Society of Anesthesiologists classification system, team familiarity, number of occasions scout nurses leave the operating room, change of scout nurse and the outcome, the non-technical skills performance of scrub nurses. Patient acuity and team familiarity were the strongest predictors of scrub nurses' non-technical skills performance at hospital site A. There were no correlations between the predictors and the performance of scrub nurses at hospital site B. A dedicated surgical team and patient acuity potentially influence the performance of scrub nurses' non-technical skills. Familiarity with team members foster advanced planning, thus minimizing distractions and interruptions that impact on scrub nurses' performance. Development of interventions aimed at improving non-technical skills has the potential to make a substantial difference and enhance patient care. © 2015 John Wiley & Sons Ltd.

  3. Challenges to effective crisis management: using information and communication technologies to coordinate emergency medical services and emergency department teams.

    PubMed

    Reddy, Madhu C; Paul, Sharoda A; Abraham, Joanna; McNeese, Michael; DeFlitch, Christopher; Yen, John

    2009-04-01

    The purpose of this study is to identify the major challenges to coordination between emergency department (ED) teams and emergency medical services (EMS) teams. We conducted a series of focus groups involving both ED and EMS team members using a crisis scenario as the basis of the focus group discussion. We also collected organizational workflow data. We identified three major challenges to coordination between ED and EMS teams including ineffectiveness of current information and communication technologies, lack of common ground, and breakdowns in information flow. The three challenges highlight the importance of designing systems from socio-technical perspective. In particular, these inter-team coordination systems must support socio-technical issues such as awareness, context, and workflow between the two teams.

  4. Technical Assistance to Developers

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rockward, Tommy; Borup, Rodney L.; Garzon, Fernando H.

    2012-07-17

    This task supports the allowance of technical assistance to fuel-cell component and system developers as directed by the DOE. This task includes testing of novel materials and participation in the further development and validation of single cell test protocols. This task also covers technical assistance to DOE Working Groups, the U.S. Council for Automotive Research (USCAR) and the USCAR/DOE Driving Research and Innovation for Vehicle efficiency and Energy sustainability (U.S. Drive) Fuel Cell Technology Team. Assistance includes technical validation of new fuel cell materials and methods, single cell fuel cell testing to support the development of targets and test protocols,more » and regular advisory participation in other working groups and reviews. This assistance is made available to PEM fuel cell developers by request and DOE Approval. The objectives are to: (1) Support technically, as directed by DOE, fuel cell component and system developers; (2) Assess fuel cell materials and components and give feedback to developers; (3) Assist the DOE Durability Working Group with the development of various new material durability Testing protocols; and (4) Provide support to the U.S. Council for Automotive Research (USCAR) and the USCAR/DOE Fuel Cell Technology Team. FY2012 specific technical objectives are: (1) Evaluate novel MPL materials; (2) Develop of startup/ shutdown protocol; (3) Test the impact of hydrophobic treatment on graphite bi-polar plates; (4) Perform complete diagnostics on metal bi-polar plates for corrosion; and (5) Participate and lead efforts in the DOE Working Groups.« less

  5. Simulation for the training of human performance and technical skills: the intersection of how we will train health care professionals in the future.

    PubMed

    Hamman, William R; Beaubien, Jeffrey M; Beaudin-Seiler, Beth M

    2009-12-01

    The aims of this research are to begin to understand health care teams in their operational environment, establish metrics of performance for these teams, and validate a series of scenarios in simulation that elicit team and technical skills. The focus is on defining the team model that will function in the operational environment in which health care professionals work. Simulations were performed across the United States in 70- to 1000-bed hospitals. Multidisciplinary health care teams analyzed more than 300 hours of videos of health care professionals performing simulations of team-based medical care in several different disciplines. Raters were trained to enhance inter-rater reliability. The study validated event sets that trigger team dynamics and established metrics for team-based care. Team skills were identified and modified using simulation scenarios that employed the event-set-design process. Specific skills (technical and team) were identified by criticality measurement and task analysis methodology. In situ simulation, which includes a purposeful and Socratic Method of debriefing, is a powerful intervention that can overcome inertia found in clinician behavior and latent environmental systems that present a challenge to quality and patient safety. In situ simulation can increase awareness of risks, personalize the risks, and encourage the reflection, effort, and attention needed to make changes to both behaviors and to systems.

  6. Impact of sleep deprivation on anaesthesia residents' non-technical skills: a pilot simulation-based prospective randomized trial.

    PubMed

    Neuschwander, A; Job, A; Younes, A; Mignon, A; Delgoulet, C; Cabon, P; Mantz, J; Tesniere, A

    2017-07-01

    Sleep deprivation is common in anaesthesia residents, but its impact on performance remains uncertain. Non-technical skills (team working, situation awareness, decision making, and task management) are key components of quality of care in anaesthesia, particularly in crisis situations occurring in the operating room. The impact of sleep deprivation on non-technical skills is unknown. We tested the hypothesis that in anaesthesia residents sleep deprivation is associated with impaired non-technical skills. Twenty anaesthesia residents were randomly allocated to undergo a simulation session after a night shift [sleep-deprived (SLD) group, n =10] or after a night of rest [rested (R) group, n =10] from January to March 2015. The simulated scenario was a situation of crisis management in the operating room. The primary end point was a composite score of anaesthetists' non-technical skills (ANTS) assessed by two blinded evaluators. Non-technical skills were significantly impaired in the SLD group [ANTS score 12.2 (interquartile range 10.5-13)] compared with the R group [14.5 (14-15), P <0.02]. This difference was mainly accounted for by a difference in the team working item. On the day of simulation, the SLD group showed increased sleepiness and decreased confidence in anaesthesia skills. In this randomized pilot trial, sleep deprivation was associated with impaired non-technical skills of anaesthesia residents in a simulated anaesthesia intraoperative crisis scenario. NCT02622217. © The Author 2017. Published by Oxford University Press on behalf of the British Journal of Anaesthesia. All rights reserved. For Permissions, please email: journals.permissions@oup.com

  7. Systematic Approach to the Development, Evolution, and Effectiveness of Integrated Product Development Teams (IPDTs)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Margie Jeffs; R. Douglas Hamelin

    Integrated Product Development Teams (IPDT) are a key component of any systems engineering (SE) application, but since they are formed primarily from technical considerations, many IPDTs are far less productive than they otherwise could be. By recognizing specific personality types and skill sets, a random group of 'technical' individuals can be structured to become a highly effective team capable of delivering much more than the sum of its members.

  8. Materials Technical Team Roadmap

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    none,

    2013-08-01

    Roadmap identifying the efforts of the Materials Technical Team (MTT) to focus primarily on reducing the mass of structural systems such as the body and chassis in light-duty vehicles (including passenger cars and light trucks) which enables improved vehicle efficiency regardless of the vehicle size or propulsion system employed.

  9. Observation of behavioural markers of non-technical skills in the operating room and their relationship to intra-operative incidents.

    PubMed

    Siu, Joey; Maran, Nikki; Paterson-Brown, Simon

    2016-06-01

    The importance of non-technical skills in improving surgical safety and performance is now well recognised. Better understanding is needed of the impact that non-technical skills of the multi-disciplinary theatre team have on intra-operative incidents in the operating room (OR) using structured theatre-based assessment. The interaction of non-technical skills that influence surgical safety of the OR team will be explored and made more transparent. Between May-August 2013, a range of procedures in general and vascular surgery in the Royal Infirmary of Edinburgh were performed. Non-technical skills behavioural markers and associated intra-operative incidents were recorded using established behavioural marking systems (NOTSS, ANTS and SPLINTS). Adherence to the surgical safety checklist was also observed. A total of 51 procedures were observed, with 90 recorded incidents - 57 of which were considered avoidable. Poor situational awareness was a common area for surgeons and anaesthetists leading to most intra-operative incidents. Poor communication and teamwork across the whole OR team had a generally large impact on intra-operative incidents. Leadership was shown to be an essential set of skills for the surgeons as demonstrated by the high correlation of poor leadership with intra-operative incidents. Team-working and management skills appeared to be especially important for anaesthetists in the recovery from an intra-operative incident. A significant number of avoidable incidents occur during operative procedures. These can all be linked to failures in non-technical skills. Better training of both individual and team in non-technical skills is needed in order to improve patient safety in the operating room. Copyright © 2014 Royal College of Surgeons of Edinburgh (Scottish charity number SC005317) and Royal College of Surgeons in Ireland. Published by Elsevier Ltd. All rights reserved.

  10. Factors That Predict Financial Sustainability of Community Coalitions: Five Years of Findings from the PROSPER Partnership Project

    PubMed Central

    Greenberg, Mark T.; Feinberg, Mark E.; Johnson, Lesley E.; Perkins, Daniel F.; Welsh, Janet A.; Spoth, Richard L.

    2014-01-01

    This study is a longitudinal investigation of the PROSPER partnership model designed to evaluate the level of sustainability funding by community prevention teams, including which factors impact teams’ generation of sustainable funding. Community teams were responsible for choosing, implementing with quality, and sustaining evidence-based programs (EBPs) intended to reduce substance misuse and promote positive youth and family development. Fourteen US rural communities and small towns were studied. Data were collected from PROSPER community team members (N=164) and Prevention Coordinators (N=10), over a 5-year period. Global and specific aspects of team functioning were assessed over 6 waves. Outcome measures were the total funds (cash and in-kind) raised to implement prevention programs. All 14 community teams were sustained for the first five years. However, there was substantial variability in the amount of funds raised and these differences were predicted by earlier and concurrent team functioning and by team sustainability planning. Given the sufficient infrastructure and ongoing technical assistance provided by the PROSPER partnership model, local sustainability of EBPs is achievable. PMID:24706195

  11. Role of medical, technical, and administrative leadership in the human resource management life cycle: a team approach to laboratory management.

    PubMed

    Wilkinson, D S; Dilts, T J

    1999-01-01

    We believe the team approach to laboratory management achieves the best outcomes. Laboratory management requires the integration of medical, technical, and administrative expertise to achieve optimal service, quality, and cost performance. Usually, a management team of two or more individuals must be assembled to achieve all of these critical leadership functions. The individual members of the management team must possess the requisite expertise in clinical medicine, laboratory science, technology management, and administration. They also must work together in a unified and collaborative manner, regardless of where individual team members appear on the organizational chart. The management team members share in executing the entire human resource management life cycle, creating the proper environment to maximize human performance. Above all, the management team provides visionary and credible leadership.

  12. Recent Experiences of the NASA Engineering and Safety Center (NESC) GN and C Technical Discipline Team (TDT)

    NASA Technical Reports Server (NTRS)

    Dennehy, Cornelius J.

    2010-01-01

    The NASA Engineering and Safety Center (NESC), initially formed in 2003, is an independently funded NASA Program whose dedicated team of technical experts provides objective engineering and safety assessments of critical, high risk projects. The GN&C Technical Discipline Team (TDT) is one of fifteen such discipline-focused teams within the NESC organization. The TDT membership is composed of GN&C specialists from across NASA and its partner organizations in other government agencies, industry, national laboratories, and universities. This paper will briefly define the vision, mission, and purpose of the NESC organization. The role of the GN&C TDT will then be described in detail along with an overview of how this team operates and engages in its objective engineering and safety assessments of critical NASA projects. This paper will then describe selected recent experiences, over the period 2007 to present, of the GN&C TDT in which they directly performed or supported a wide variety of NESC assessments and consultations.

  13. Examining participant perceptions of an interprofessional simulation-based trauma team training for medical and nursing students.

    PubMed

    Jakobsen, Rune Bruhn; Gran, Sarah Frandsen; Grimsmo, Bergsvein; Arntzen, Kari; Fosse, Erik; Frich, Jan C; Hjortdahl, Per

    2018-01-01

    High quality care relies on interprofessional teamwork. We developed a short simulation-based course for final year medical, nursing and nursing anaesthesia students, using scenarios from emergency medicine. The aim of this paper is to describe the adaptation of an interprofessional simulation course in an undergraduate setting and to report participants' experiences with the course and students' learning outcomes. We evaluated the course collecting responses from students through questionnaires with both closed-ended and open-ended questions, supplemented by the facilitators' assessment of students' performance. Our data is based on responses from 310 students and 16 facilitators who contributed through three evaluation phases. In the analysis, we found that students reported emotional activation and learning outcomes within the domains self-insight and stress management, understanding of the leadership role, insight into teamwork, and skills in team communication. In subsequent questionnaire studies students reported having gained insights about communication, teamwork and leadership, and they believed they would be better leaders of teams and/or team members after having completed the course. Facilitators' observations suggested a progress in students' non-technical skills during the course. The facilitators observed that nursing anaesthesia students seemed to be more comfortable in finding their role in the team than the two other groups. In conclusion, we found that an interprofessional simulation-based emergency team training course with a focus on leadership, communication and teamwork, was feasible to run on a regular basis for large groups of students. The course improved the students' team skills and received a favourable evaluation from both students and faculty.

  14. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Burton, J. C.; Environmental Research

    The Commodity Credit Corporation (CCC) of the U.S. Department of Agriculture (USDA) has entered into an interagency agreement with the U.S. Department of Energy (DOE) under which Argonne National Laboratory provides technical assistance for hazardous waste site characterization and remediation for the CCC/USDA. Carbon tetrachloride is the contaminant of primary concern at sites in Kansas where former CCC/USDA grain storage facilities were located. Argonne applies its QuickSite(reg sign) Expedited Site Characterization (ESC) approach to these former facilities. The QuickSite environmental site characterization methodology is Argonne's proprietary implementation of the ESC process (ASTM 1998). Argonne has used this approach at severalmore » former CCC/USDA facilities in Kansas, including Agenda, Agra, Everest, and Frankfort. The Argonne ESC approach revolves around a multidisciplinary, team-oriented approach to problem solving. The basic features and steps of the QuickSite methodology are as follows: (1) A team of scientists with diverse expertise and strong field experience is required to make the process work. The Argonne team is composed of geologists, geochemists, geophysicists, hydrogeologists, chemists, biologists, engineers, computer scientists, health and safety personnel, and regulatory staff, as well as technical support staff. Most of the staff scientists are at the Ph.D. level; each has on average, more than 15 years of experience. The technical team works together throughout the process. In other words, the team that plans the program also implements the program in the field and writes the reports. More experienced scientists do not remain in the office while individuals with lesser degrees or experience carry out the field work. (2) The technical team reviews, evaluates, and interprets existing data for the site and the contaminants there to determine which data sets are technically valid and can be used in initially designing the field program. A basic mistake sometimes made in the site characterization process is failure to use technically sound available data to form working hypotheses on hydrogeology, contaminant distribution, etc. for initial testing. (3) After assembling and interpreting existing data for the site, the entire technical team visits the site to identify as a group the site characteristics that might prohibit or enhance any particular technological approach. Logistic and community constraints are also identified at this point. (4) After the field visit, the team selects a suite of technologies appropriate to the problem and completes the design of the field program. No one technique works well at all sites, and a suite of techniques is necessary to delineate site features fully. In addition, multiple technologies are employed to increase confidence in conclusions about site features. Noninvasive and minimally invasive technologies are emphasized to minimize risk to the environment, the community, and the staff. In no case is the traditional approach of installing a massive number of monitoring wells followed. A dynamic work plan that outlines the program is produced for the sponsoring and regulatory agencies. The word ''dynamic'' is emphasized because the work plan is viewed as a guide, subject to modification, for the site characterization activity, rather than a document that is absolute and unchangeable. Therefore, the health and safety plan and the quality assurance/quality control plan must be broad and encompass all possible alterations to the plan. The cooperation of the regulating agency is essential in successful implementation of this process. The sponsoring and regulatory agencies are notified if significant changes to the site-specific work plan are necessary. (5) The entire team participates in the technical field program. Several technical activities are undertaken simultaneously. These may range from different surface geophysics investigations to vegetation sampling. Data from the various activities are reduced and interpreted each day by the technical staff. Various computer programs are used to visualize and integrate the data. However, people do the data interpretation and integration, not the computers, which are just one more tool at the site. At the end of the day, the staff members meet, review results, and modify the next day's program as necessary to optimize activities that are generating overlapping or confirming site details. Data are not arbitrarily discarded -- each finding must be explained and understood. Anomalous readings may be due to equipment malfunctions, laboratory error, or the inability of a technique to work in a given setting. The suite of selected technologies is adjusted in the field if necessary. (6) The end result of this process is the optimization of the field activity to produce a high-quality technical product that is cost and time effective.« less

  15. AN INNOVATIVE DESIGN FOR ANAEROBIC CO-DIGESTION OF ANIMAL WASTES FOR SUSTAINABLE DEVELOPMENT IN RURAL COMMUNITIES

    EPA Science Inventory

    With the aim of the Phase I project to develop an innovative anaerobic co-digestion design for the treatment of dairy manure and poultry waste, our Phase I team has evaluated the technical and economic feasibility of the anaerobic co-digestion design concept with a thorough in...

  16. Scientific and technical advisory committee review of the nutrient inputs to the watershed model

    USDA-ARS?s Scientific Manuscript database

    The following is a report by a STAC Review Team concerning the methods and documentation used by the Chesapeake Bay Partnership for evaluation of nutrient inputs to Phase 6 of the Chesapeake Bay Watershed Model. The “STAC Review of the Nutrient Inputs to the Watershed Model” (previously referred to...

  17. Do failures in non-technical skills contribute to fatal medical accidents in Japan? A review of the 2010–2013 national accident reports

    PubMed Central

    Uramatsu, Masashi; Fujisawa, Yoshikazu; Mizuno, Shinya; Souma, Takahiro; Komatsubara, Akinori; Miki, Tamotsu

    2017-01-01

    Objectives We sought to clarify how large a proportion of fatal medical accidents can be considered to be caused by poor non-technical skills, and to support development of a policy to reduce number of such accidents by making recommendations about possible training requirements. Design Summaries of reports of fatal medical accidents, published by the Japan Medical Safety Research Organization, were reviewed individually. Three experienced clinicians and one patient safety expert conducted the reviews to determine the cause of death. Views of the patient safety expert were given additional weight in the overall determination. Setting A total of 73 summary reports of fatal medical accidents were reviewed. These reports had been submitted by healthcare organisations across Japan to the Japan Medical Safety Research Organization between April 2010 and March 2013. Primary and secondary outcome measures The cause of death in fatal medical accidents, categorised into technical skills, non-technical skills and inevitable progress of disease were evaluated. Non-technical skills were further subdivided into situation awareness, decision making, communication, team working, leadership, managing stress and coping with fatigue. Results Overall, the cause of death was identified as non-technical skills in 34 cases (46.6%), disease progression in 33 cases (45.2%) and technical skills in two cases (5.5%). In two cases, no consensual determination could be achieved. Further categorisation of cases of non-technical skills were identified as 14 cases (41.2%) of problems with situation awareness, eight (23.5%) with team working and three (8.8%) with decision making. These three subcategories, or combinations of them, were identified as the cause of death in 33 cases (97.1%). Conclusions Poor non-technical skills were considered to be a significant cause of adverse events in nearly half of the fatal medical accidents examined. Improving non-technical skills may be effective for reducing accidents, and training in particular subcategories of non-technical skills may be especially relevant. PMID:28209605

  18. Making intelligent systems team players: Overview for designers

    NASA Technical Reports Server (NTRS)

    Malin, Jane T.; Schreckenghost, Debra L.

    1992-01-01

    This report is a guide and companion to the NASA Technical Memorandum 104738, 'Making Intelligent Systems Team Players,' Volumes 1 and 2. The first two volumes of this Technical Memorandum provide comprehensive guidance to designers of intelligent systems for real-time fault management of space systems, with the objective of achieving more effective human interaction. This report provides an analysis of the material discussed in the Technical Memorandum. It clarifies what it means for an intelligent system to be a team player, and how such systems are designed. It identifies significant intelligent system design problems and their impacts on reliability and usability. Where common design practice is not effective in solving these problems, we make recommendations for these situations. In this report, we summarize the main points in the Technical Memorandum and identify where to look for further information.

  19. The Undergraduate Student Instrument Project (USIP) - building the STEM workforce by providing exciting, multi-disciplinary, student-led suborbital flight projects.

    NASA Astrophysics Data System (ADS)

    Dingwall, B. J.

    2015-12-01

    NASA's Science Mission Directorate (SMD) recognizes that suborbital carriers play a vital role in training our country's future science and technology leaders. SMD created the Undergraduate Student Instrument Project (USIP) to offer students the opportunity to design, build, and fly instruments on NASA's unique suborbital research platforms. This paper explores the projects, the impact, and the lessons learned of USIP. USIP required undergraduate teams to design, build, and fly a scientific instrument in 18 months or less. Students were required to form collaborative multidisciplinary teams to design, develop and build their instrument. Teams quickly learned that success required skills often overlooked in an academic environment. Teams quickly learned to share technical information in a clear and concise manner that could be understood by other disciplines. The aggressive schedule required team members to hold each other accountable for progress while maintaining team unity. Unanticipated problems and technical issues led students to a deeper understanding of the need for schedule and cost reserves. Students exited the program with a far deeper understanding of project management and team dynamics. Through the process of designing and building an instrument that will enable new research transforms students from textbook learners to developers of new knowledge. The initial USIP project funded 10 undergraduate teams that flew a broad range of scientific instruments on scientific balloons, sounding rockets, commercial rockets and aircraft. Students were required to prepare for and conduct the major reviews that are an integral part of systems development. Each project conducted a Preliminary Design Review, Critical Design Review and Mission Readiness review for NASA officials and flight platform providers. By preparing and presenting their designs to technical experts, the students developed a deeper understanding of the technical and programmatic project pieces that were necessary for success. A student survey was conducted to assess the impact of USIP. Over 90% of students reported a significant improvement in their technical and project management skills. Perhaps more importantly, 88% of students reported that they have a far better appreciation for the value of multi-disciplinary teams.

  20. Additively Manufactured, Net Shape Powder Metallurgy Cans for Valves Used in Energy Production

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peter, William H.; Gandy, David; Lannom, Robert

    This CRADA NFE-14-05241 was conducted as a Technical Collaboration project within the Oak Ridge National Laboratory (ORNL) Manufacturing Demonstration Facility (MDF) sponsored by the US Department of Energy Advanced Manufacturing Office (CPS Agreement Number 24761). Opportunities for MDF technical collaborations are listed in the announcement “Manufacturing Demonstration Facility Technology Collaborations for US Manufacturers in Advanced Manufacturing and Materials Technologies” posted at http://web.ornl.gov/sci/manufacturing/docs/FBO-ORNL-MDF-2013-2.pdf. The goal of technical collaborations is to engage industry partners to participate in short-term, collaborative projects within the Manufacturing Demonstration Facility (MDF) to assess applicability and of new energy efficient manufacturing technologies. Research sponsored by the U.S. Departmentmore » of Energy, Office of Energy Efficiency and Renewable Energy, Advanced Manufacturing Office, under contract DE-AC05-00OR22725 with UT-Battelle, LLC.ORNL would like to acknowledge the leadership of EPRI in pulling together the extensive team and managing the execution of the project. In addition, ORNL would like to acknowledge the other contributions of the team members associated with this project. Quintus provided time, access, expertise, and labor of their hydro forming capabilities to evaluate both conventional and additively manufactured tools through this process. Crane ChemPharma Energy provided guidance and information on valve geometries. Carpenter Powder Products was involved with the team providing information on powder processing as it pertains to the canning and hot isostatic pressing of powder. on providing powder and knowledge as it pertains to powder supply for hot isostatic pressing; they also provided powder for the test trials by the industrial team. Bodycote provided guidance on hot isostatic pressing and can requirements. They were also responsible for the hot isostatic pressing of the test valve performed by the industrial team.« less

  1. Factors that predict financial sustainability of community coalitions: five years of findings from the PROSPER partnership project.

    PubMed

    Greenberg, Mark T; Feinberg, Mark E; Johnson, Lesley E; Perkins, Daniel F; Welsh, Janet A; Spoth, Richard L

    2015-01-01

    This study is a longitudinal investigation of the Promoting School-community-university Partnerships to Enhance Resilience (PROSPER) partnership model designed to evaluate the level of sustainability funding by community prevention teams, including which factors impact teams' generation of sustainable funding. Community teams were responsible for choosing, implementing with quality, and sustaining evidence-based programs (EBPs) intended to reduce substance misuse and promote positive youth and family development. Fourteen US rural communities and small towns were studied. Data were collected from PROSPER community team members (N = 164) and prevention coordinators (N = 10) over a 5-year period. Global and specific aspects of team functioning were assessed over six waves. Outcome measures were the total funds (cash and in-kind) raised to implement prevention programs. All 14 community teams were sustained for the first 5 years. However, there was substantial variability in the amount of funds raised, and these differences were predicted by earlier and concurrent team functioning and by team sustainability planning. Given the sufficient infrastructure and ongoing technical assistance provided by the PROSPER partnership model, local sustainability of EBPs is achievable.

  2. Relationship between intraoperative non-technical performance and technical events in bariatric surgery.

    PubMed

    Fecso, A B; Kuzulugil, S S; Babaoglu, C; Bener, A B; Grantcharov, T P

    2018-03-30

    The operating theatre is a unique environment with complex team interactions, where technical and non-technical performance affect patient outcomes. The correlation between technical and non-technical performance, however, remains underinvestigated. The purpose of this study was to explore these interactions in the operating theatre. A prospective single-centre observational study was conducted at a tertiary academic medical centre. One surgeon and three fellows participated as main operators. All patients who underwent a laparoscopic Roux-en-Y gastric bypass and had the procedures captured using the Operating Room Black Box ® platform were included. Technical assessment was performed using the Objective Structured Assessment of Technical Skills and Generic Error Rating Tool instruments. For non-technical assessment, the Non-Technical Skills for Surgeons (NOTSS) and Scrub Practitioners' List of Intraoperative Non-Technical Skills (SPLINTS) tools were used. Spearman rank-order correlation and N-gram statistics were conducted. Fifty-six patients were included in the study and 90 procedural steps (gastrojejunostomy and jejunojejunostomy) were analysed. There was a moderate to strong correlation between technical adverse events (r s  = 0·417-0·687), rectifications (r s  = 0·380-0·768) and non-technical performance of the surgical and nursing teams (NOTSS and SPLINTS). N-gram statistics showed that after technical errors, events and prior rectifications, the staff surgeon and the scrub nurse exhibited the most positive non-technical behaviours, irrespective of operator (staff surgeon or fellow). This study demonstrated that technical and non-technical performances are related, on both an individual and a team level. Valuable data can be obtained around intraoperative errors, events and rectifications. © 2018 BJS Society Ltd Published by John Wiley & Sons Ltd.

  3. Implementation of quality improvement techniques for management and technical processes in the ACRV project

    NASA Technical Reports Server (NTRS)

    Raiman, Laura B.

    1992-01-01

    Total Quality Management (TQM) is a cooperative form of doing business that relies on the talents of everyone in an organization to continually improve quality and productivity, using teams and an assortment of statistical and measurement tools. The objective of the activities described in this paper was to implement effective improvement tools and techniques in order to build work processes which support good management and technical decisions and actions which are crucial to the success of the ACRV project. The objectives were met by applications in both the technical and management areas. The management applications involved initiating focused continuous improvement projects with widespread team membership. The technical applications involved applying proven statistical tools and techniques to the technical issues associated with the ACRV Project. Specific activities related to the objective included working with a support contractor team to improve support processes, examining processes involved in international activities, a series of tutorials presented to the New Initiatives Office and support contractors, a briefing to NIO managers, and work with the NIO Q+ Team. On the technical side, work included analyzing data from the large-scale W.A.T.E.R. test, landing mode trade analyses, and targeting probability calculations. The results of these efforts will help to develop a disciplined, ongoing process for producing fundamental decisions and actions that shape and guide the ACRV organization .

  4. Implementation of quality improvement techniques for management and technical processes in the ACRV project

    NASA Astrophysics Data System (ADS)

    Raiman, Laura B.

    1992-12-01

    Total Quality Management (TQM) is a cooperative form of doing business that relies on the talents of everyone in an organization to continually improve quality and productivity, using teams and an assortment of statistical and measurement tools. The objective of the activities described in this paper was to implement effective improvement tools and techniques in order to build work processes which support good management and technical decisions and actions which are crucial to the success of the ACRV project. The objectives were met by applications in both the technical and management areas. The management applications involved initiating focused continuous improvement projects with widespread team membership. The technical applications involved applying proven statistical tools and techniques to the technical issues associated with the ACRV Project. Specific activities related to the objective included working with a support contractor team to improve support processes, examining processes involved in international activities, a series of tutorials presented to the New Initiatives Office and support contractors, a briefing to NIO managers, and work with the NIO Q+ Team. On the technical side, work included analyzing data from the large-scale W.A.T.E.R. test, landing mode trade analyses, and targeting probability calculations. The results of these efforts will help to develop a disciplined, ongoing process for producing fundamental decisions and actions that shape and guide the ACRV organization .

  5. Defining Projects to Integrate Evolving Team Fundamentals and Project Management Skills

    ERIC Educational Resources Information Center

    Smith, Harold, III; Smarkusky, Debra; Corrigall, Elizabeth

    2008-01-01

    Industry has indicated the desire for academic programs to produce graduates that are well-versed in collaborative problem solving and general project management concepts in addition to technical skills. The primary focus of a curriculum is typically centered on the technical training with minimal attention given to coalescing team and project…

  6. 76 FR 27998 - Public Meeting of the Steering Committee for the National Fish, Wildlife and Plants Climate...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-13

    ... Strategy. The Committee will oversee the Technical (writing) Teams, ensure a robust engagement process with... the Strategy's Technical Teams and stakeholder engagement. DATES: The second Steering Committee... public comment during the meeting at approximately 3 p.m., and written comments may be submitted via the...

  7. Project T.E.A.M. (Technical Education Advancement Modules). Advanced Statistical Process Control.

    ERIC Educational Resources Information Center

    Dunlap, Dale

    This instructional guide, one of a series developed by the Technical Education Advancement Modules (TEAM) project, is a 20-hour advanced statistical process control (SPC) and quality improvement course designed to develop the following competencies: (1) understanding quality systems; (2) knowing the process; (3) solving quality problems; and (4)…

  8. Waste Isolation Pilot Plant Technical Assessment Team Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    This report provides the results of the Waste Isolation Pilot Plant (WIPP) technical assessment led by the Savannah River National Laboratory and conducted by a team of experts in pertinent disciplines from SRNL and Lawrence Livermore National Laboratory (LLNL), Oak Ridge National Laboratory (ORNL), Pacific Northwest National Laboratory (PNNL), and Sandia National Laboratories (SNL).

  9. 75 FR 51240 - Pacific Fishery Management Council; Public Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-19

    ... Remarks and Introductions 2. Council Member Appointments 3. Roll Call 4. Executive Director's Report 5... Technical Team/Salmon Amendment Committee Joint 8 a.m. Session Scientific and Statistical Committee 8 a.m.... Salmon Technical Team 8 a.m. Scientific and Statistical Committee 8 a.m. Enforcement Consultants 4:30 p.m...

  10. Effect of a simulation-based workshop on multidisplinary teamwork of newborn emergencies: an intervention study.

    PubMed

    Rovamo, Liisa; Nurmi, Elisa; Mattila, Minna-Maria; Suominen, Pertti; Silvennoinen, Minna

    2015-11-12

    Video analyses of real-life newborn resuscitations have shown that Neonatal Resuscitation Program (NRP) guidelines are followed in fewer than 50% of cases. Multidisciplinary simulation is used as a first-rate tool for the improvement of teamwork among health professionals. In the study we evaluated the impact of the crisis resource management (CRM) and anesthesia non-technical skills instruction on teamwork during simulated newborn emergencies. Ninety-nine participants of two delivery units (17 pediatricians, 16 anesthesiologists, 14 obstetricians, 31 midwives, and 21 neonatal nurses) were divided to an intervention group (I-group, 9 teams) and a control group (C-group, 6 teams). The I-group attended a CRM and ANTS instruction before the first scenario. After each scenario the I-group performed either self- or peer-assessment depending on whether they had acted or observed in the scenario. All the teams participated in two and observed another two scenarios. All the scenarios were video-recorded and scored by three experts with Team Emergency Assessment Measure (TEAM). SPSS software and nlme package were used for the statistical analyses. The total TEAM scores of the first scenario between the I- and C-group did not differ from each other. Neither there was an increase in the TEAM scoring between the first and second scenario between the groups. The CRM instruction did not improve the I-group's teamwork performance. Unfortunately the teams were not comparable because the teams had been allowed to self-select their members in the study design. The total TEAM scores varied a lot between the teams. Mixed-model linear regression revealed that the background of the team leader had an impact on differences of the total teamwork scores (D = 6.50, p = 0.039). When an anesthesia consultant was the team leader the mean teamwork improved by 6.41 points in comparison to specialists of other disciplines (p = 0.043). The instruction of non-technical skills before simulation training did not enhance the acquisition of teamwork skills of the intervention groups over the corresponding set of skills of the control groups. The teams led by an anesthesiologist scored the best. Experience of team leaders improved teamwork over the CRM instruction.

  11. A joint university-government technical editing program

    NASA Technical Reports Server (NTRS)

    Stohrer, Freda F.; Pinelli, Thomas E.

    1978-01-01

    The NASA Langley Research Center (LaRC) and Old Dominion University have designed a mutually useful technical editing program. A university team made up of an English instructor and two graduate students - one from English, one from engineering - works with a senior editor from LaRC to prepare technical reports for publication. A round-robin technique gives the university team editorial commentary from both language and technical specialists; the senior editor from LaRC supervises reports through final publication. To date, the system has provided LaRC with a respectable product and university students with valuable on-the-job training.

  12. Inter-professional in-situ simulated team and resuscitation training for patient safety: Description and impact of a programmatic approach.

    PubMed

    Zimmermann, Katja; Holzinger, Iris Bachmann; Ganassi, Lorena; Esslinger, Peter; Pilgrim, Sina; Allen, Meredith; Burmester, Margarita; Stocker, Martin

    2015-10-29

    Inter-professional teamwork is key for patient safety and team training is an effective strategy to improve patient outcome. In-situ simulation is a relatively new strategy with emerging efficacy, but best practices for the design, delivery and implementation have yet to be evaluated. Our aim is to describe and evaluate the implementation of an inter-professional in-situ simulated team and resuscitation training in a teaching hospital with a programmatic approach. We designed and implemented a team and resuscitation training program according to Kern's six steps approach for curriculum development. General and specific needs assessments were conducted as independent cross-sectional surveys. Teamwork, technical skills and detection of latent safety threats were defined as specific objectives. Inter-professional in-situ simulation was used as educational strategy. The training was embedded within the workdays of participants and implemented in our highest acuity wards (emergency department, intensive care unit, intermediate care unit). Self-perceived impact and self-efficacy were sampled with an anonymous evaluation questionnaire after every simulated training session. Assessment of team performance was done with the team-based self-assessment tool TeamMonitor applying Van der Vleuten's conceptual framework of longitudinal evaluation after experienced real events. Latent safety threats were reported during training sessions and after experienced real events. The general and specific needs assessments clearly identified the problems, revealed specific training needs and assisted with stakeholder engagement. Ninety-five interdisciplinary staff members of the Children's Hospital participated in 20 in-situ simulated training sessions within 2 years. Participant feedback showed a high effect and acceptance of training with reference to self-perceived impact and self-efficacy. Thirty-five team members experiencing 8 real critical events assessed team performance with TeamMonitor. Team performance assessment with TeamMonitor was feasible and identified specific areas to target future team training sessions. Training sessions as well as experienced real events revealed important latent safety threats that directed system changes. The programmatic approach of Kern's six steps for curriculum development helped to overcome barriers of design, implementation and assessment of an in-situ team and resuscitation training program. This approach may help improve effectiveness and impact of an in-situ simulated training program.

  13. Crusader solid propellant best technical approach

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Graves, V.; Bader, G.; Dolecki, M.

    1995-12-01

    The goal of the Solid Propellant Resupply Team is to develop Crusader system concepts capable of automatically handling 155mm projectiles and Modular Artillery Charges (MACs) based on system requirements. The system encompasses all aspects of handling from initial input into a resupply vehicle (RSV) to the final loading into the breech of the self-propelled howitzer (SPH). The team, comprised of persons from military and other government organizations, developed concepts for the overall vehicles as well as their interior handling components. An intermediate review was conducted on those components, and revised concepts were completed in May 1995. A concept evaluation wasmore » conducted on the finalized concepts, from both a systems level and a component level. The team`s Best Technical Approach (BTA) concept was selected from that evaluation. Both vehicles in the BTA have a front-engine configuration with the crew situated behind the engine-low in the vehicles. The SPH concept utilizes an automated reload port at the rear of the vehicle, centered high. The RSV transfer boom will dock with this port to allow automated ammunition transfer. The SPH rearm system utilizes fully redundant dual loaders. Active magazines are used for both projectiles and MACs. The SPH also uses a nonconventional tilted ring turret configuration to maximize the available interior volume in the vehicle. This configuration can be rearmed at any elevation angle but only at 0{degree} azimuth. The RSV configuration is similar to that of the SPH. The RSV utilizes passive storage racks with a pick-and-place manipulator for handling the projectiles and active magazines for the MACs. A telescoping transfer boom extends out the front of the vehicle over the crew and engine.« less

  14. California four cities program, 1971 - 1973. [aerospace-to-urban technology application

    NASA Technical Reports Server (NTRS)

    Macomber, H. L.; Wilson, J. H.

    1974-01-01

    A pilot project in aerospace-to-urban technology application is reported. Companies assigned senior engineering professionals to serve as Science and Technology Advisors to participating city governments. Technical support was provided by the companies and JPL. The cities, Anaheim, Fresno, Pasadena, and San Hose, California, provided the working environment and general service support. Each city/company team developed and carried out one or more technical or management pilot projects together with a number of less formalized technology efforts and studies. An account and evaluation is provided of the initial two-year phase of the program.

  15. NGST Science Instruments and Process

    NASA Technical Reports Server (NTRS)

    Mather, John

    1999-01-01

    Possible NGST (Next Generation Space Telescope) instruments have been studied by NASA, ESA (European Space Agency), and CSA (Canadian Space Agency) teams, and their reports were presented at this meeting and published on the NGST web sites. The instrument capabilities will be evaluated by the Ad Hoc Science Working Group and the technical readiness will be reviewed by a technical panel. Recommendations will be made to the NASA Project Scientist, who will present a report for public comment. NASA. ESA, and the CSA will then allocate instrument, responsibilities in early 2000. NASA will choose its scientific investigations with instruments in 2002.

  16. Aircraft digital flight control technical review

    NASA Technical Reports Server (NTRS)

    Davenport, Otha B.; Leggett, David B.

    1993-01-01

    The Aircraft Digital Flight Control Technical Review was initiated by two pilot induced oscillation (PIO) incidents in the spring and summer of 1992. Maj. Gen. Franklin (PEO) wondered why the Air Force development process for digital flight control systems was not preventing PIO problems. Consequently, a technical review team was formed to examine the development process and determine why PIO problems continued to occur. The team was also to identify the 'best practices' used in the various programs. The charter of the team was to focus on the PIO problem, assess the current development process, and document the 'best practices.' The team reviewed all major USAF aircraft programs with digital flight controls, specifically, the F-15E, F-16C/D, F-22, F-111, C-17, and B-2. The team interviewed contractor, System Program Office (SPO), and Combined Test Force (CTF) personnel on these programs. The team also went to NAS Patuxent River to interview USN personnel about the F/A-18 program. The team also reviewed experimental USAF and NASA systems with digital flight control systems: X-29, X-31, F-15 STOL and Maneuver Technology Demonstrator (SMTD), and the Variable In-Flight Stability Test Aircraft (VISTA). The team also discussed the problem with other experts in the field including Ralph Smith and personnel from Calspan. The major conclusions and recommendations from the review are presented.

  17. Translating Technical Support Into Country Action: The Role of the Interagency Task Team on the Prevention and Treatment of HIV Infection in Pregnant Women, Mothers, and Children in the Global Plan Era.

    PubMed

    Luo, Chewe; Hirnschall, Gottfried; Rodrigues, Jessica; Romano, Sostena; Essajee, Shaffiq; Rogers, Braeden; McCarthy, Elizabeth; Mwango, Albert; Sangrujee, Nalinee; Adler, Michelle R; Houston, James C; Langa, Judite O; Urso, Marilena; Bolu, Omotayo; Tene, Gilbert; Elat Nfetam, Jean B; Kembou, Etienne; Phelps, Benjamin R

    2017-05-01

    While the Interagency Task Team on the Prevention and Treatment of HIV Infection in Pregnant Women, Mothers, and Children (IATT) partnership existed before the Global Plan Towards the Elimination of New HIV Infections Among Children by 2015 and Keeping Their Mothers Alive (Global Plan), its reconfiguration was critical to coordinating provision of technical assistance that positively influenced country decision-making and program performance. This article describes how the Global Plan anchored the work of the IATT and, in turn, how the IATT's technical assistance helped to accelerate achievement of the Global Plan targets and milestones. The technical assistance that will be discussed addressed a broad range of priority actions and milestones described in the Global Plan: (1) planning for and implementing Option B+; (2) strengthening monitoring and evaluation systems; (3) translating evidence into action and advocacy; and (4) promoting community engagement. This article also reviews the ongoing challenges and opportunities of providing technical assistance in a rapidly evolving environment that calls for ever more flexible and contextualized responses. The effectiveness of technical assistance facilitated by the IATT was defined by its timeliness, evidence base, and unique global perspective that built on the competencies of its partners and promoted synergies across program areas. Reaching the final goal of eliminating vertical transmission of HIV infection and achieving an AIDS-free generation in countries with the highest HIV burden requires that the IATT partnership and technical assistance remain responsive to country-specific needs while aligning with the current programmatic reality and new global goals such as the Sustainable Development Goals and 90-90-90 targets.

  18. The Association between Tolerance for Ambiguity and Fear of Negative Evaluation: A Study of Engineering Technology Capstone Courses

    ERIC Educational Resources Information Center

    Dubikovsky, Sergey I.

    2016-01-01

    For many students in engineering and engineering technology programs in the US, senior capstone design courses require students to form a team, define a problem, and find a feasible technical solution to address this problem. Students must integrate the knowledge and skills acquired during their studies at the college or university level. These…

  19. A Unique Sequence of Financial Accounting Courses Featuring Team Teaching, Linked Courses, Challenging Assignments, and Instruments for Evaluation and Assessment

    ERIC Educational Resources Information Center

    Lundblad, Heidemarie; Wilson, Barbara A.

    2008-01-01

    The Department of Accounting at California State University Northridge (CSUN) has developed a unique sequence of courses designed to ensure that accounting students are trained not only in technical accounting, but also acquire critical thinking, research and communication skills. The courses have proven effective and have embedded assessment…

  20. Issues in Developing and Evaluating a Culturally Tailored Internet Cancer Support Group

    PubMed Central

    Im, Eun-Ok; Ji, Xiaopeng; Zhang, Jingwen; Kim, Sangmi; Lee, Yaelim; Chee, Eunice; Chee, Wonshik; Tsai, Hsiu-Min; Nishigaki, Masakazu; Yeo, Seon Ae; Schapira, Marilyn; Mao, Jun James

    2016-01-01

    The purpose of this paper is to explore practical issues in developing and implementing a culturally tailored Internet Cancer Support Group for a group of ethnic minority cancer patients—Asian American cancer patients. Throughout the research process of the original study testing the Internet cancer support group, research team made written records of practical issues and plausible rationales for the issues. Weekly group discussion among research team members was conducted, and the discussion records were evaluated and analyzed using a content analysis (with individual words as the unit of analysis). The codes from the analysis process were categorized into idea themes, through which the issues were extracted. The issues included those in: (a) difficulties in using multiple languages; (b) collaboration with the IT department and technical challenges (c) difficulties in recruitment; (d) difficulties in retention; (e) optimal timing; and (f) characteristics of the users. Based on the findings, we suggested researchers to plan a workable translation process, check technical needs in advance, use multiple strategies to recruit and retain research participants, plan the right time for data collection, and consider characteristics of the users in the study design. PMID:27379523

  1. Evaluation of the Redesign of an Undergraduate Cell Biology Course

    PubMed Central

    McEwen, Laura April; Harris, dik; Schmid, Richard F.; Vogel, Jackie; Western, Tamara

    2009-01-01

    This article offers a case study of the evaluation of a redesigned and redeveloped laboratory-based cell biology course. The course was a compulsory element of the biology program, but the laboratory had become outdated and was inadequately equipped. With the support of a faculty-based teaching improvement project, the teaching team redesigned the course and re-equipped the laboratory, using a more learner-centered, constructivist approach. The focus of the article is on the project-supported evaluation of the redesign rather than the redesign per se. The evaluation involved aspects well beyond standard course assessments, including the gathering of self-reported data from the students concerning both the laboratory component and the technical skills associated with the course. The comparison of pre- and postdata gave valuable information to the teaching team on course design issues and skill acquisition. It is argued that the evaluation process was an effective use of the scarce resources of the teaching improvement project. PMID:19255138

  2. A Curriculum to Enhance Decision-Making Skills of Technical Personnel Working in Teams

    ERIC Educational Resources Information Center

    Raju, P. K.; Sankar, Chetan S.; Xue, Yajiong

    2004-01-01

    Rapidly changing engineering designs and business scenarios make it essential for engineers and technical personnel to be trained to be effective team players and project managers. This paper reports the experiences gained in developing and implementing a workshop to train engineers at a steel manufacturing plant. The objective of the workshop was…

  3. Enabling Rapid Integration of Combined Arms Teams into a Brigade Combat Team Organizational Structure

    DTIC Science & Technology

    2017-06-01

    organizational structure , fixed vs. mobile forward operating base (FOB) synchronization, prior preparation, and unit capabilities. 5. Ideas to Improve...Technical Report 1356 Enabling Rapid Integration of Combined Arms Teams into a Brigade Combat Team Organizational Structure ...2012 - May 2014 4. TITLE AND SUBTITLE Enabling Rapid Integration of Combined Arms Teams into a Brigade Combat Team Organizational Structure

  4. Automation of TL brick dating by ADAM-1

    NASA Astrophysics Data System (ADS)

    Čechák, T.; Gerndt, J.; Hiršl, P.; Jiroušek, P.; Kanaval, J.; Kubelík, M.; Musílek, L.

    2001-06-01

    A specially adapted machine ADAM-1 for the thermoluminescence fine grain dating of bricks was constructed in an interdisciplinary research project, undertaken by a team recruited from three faculties of the Czech Technical University in Prague. This TL-reader is able to measure and evaluate automatically numerous samples. The sample holder has 60 sample positions, which allow the irradiation and evaluation of samples taken from two locations. All procedures of alpha and beta irradiation by varying doses and the TL-signal measurement as also the age evaluation and error assessment are programmable and fully automated.

  5. Relationship between Procedural Tactical Knowledge and Specific Motor Skills in Young Soccer Players

    PubMed Central

    Aquino, Rodrigo; Marques, Renato Francisco R.; Petiot, Grégory Hallé; Gonçalves, Luiz Guilherme C.; Moraes, Camila; Santiago, Paulo Roberto P.; Puggina, Enrico Fuini

    2016-01-01

    The purpose of this study was to investigate the association between offensive tactical knowledge and the soccer-specific motor skills performance. Fifteen participants were submitted to two evaluation tests, one to assess their technical and tactical analysis. The motor skills performance was measured through four tests of technical soccer skills: ball control, shooting, passing and dribbling. The tactical performance was based on a tactical assessment system called FUT-SAT (Analyses of Procedural Tactical Knowledge in Soccer). Afterwards, technical and tactical evaluation scores were ranked with and without the use of the cluster method. A positive, weak correlation was perceived in both analyses (rho = 0.39, not significant p = 0.14 (with cluster analysis); and rho = 0.35; not significant p = 0.20 (without cluster analysis)). We can conclude that there was a weak association between the technical and the offensive tactical knowledge. This shows the need to reflect on the use of such tests to assess technical skills in team sports since they do not take into account the variability and unpredictability of game actions and disregard the inherent needs to assess such skill performance in the game. PMID:29910300

  6. Leveraging Independent Management and Chief Engineer Hierarchy: Vertically and Horizontally-Derived Technical Authority Value

    NASA Technical Reports Server (NTRS)

    Barley, Bryan; Newhouse, Marilyn

    2012-01-01

    In the development of complex spacecraft missions, project management authority is usually extended hierarchically from NASA's highest agency levels down to the implementing institution's project team level, through both the center and the program. In parallel with management authority, NASA utilizes a complementary, but independent, hierarchy of technical authority (TA) that extends from the agency level to the project, again, through both the center and the program. The chief engineers (CEs) who serve in this technical authority capacity oversee and report on the technical status and ensure sound engineering practices, controls, and management of the projects and programs. At the lowest level, implementing institutions assign project CEs to technically engage projects, lead development teams, and ensure sound technical principles, processes, and issue resolution. At the middle level, programs and centers independently use CEs to ensure the technical success of their projects and programs. At the agency level, NASA's mission directorate CEs maintain technical cognizance over every program and project in their directorate and advise directorate management on the technical, cost, schedule, and programmatic health of each. As part of this vertically-extended CE team, a program level CE manages a continually varying balance between penetration depth and breadth across his or her assigned missions. Teamwork issues and information integration become critical for management at all levels to ensure value-added use of both the synergy available between CEs at the various agency levels, and the independence of the technical authority at each organization.

  7. Physiological responses and time-motion characteristics of 4-a-side small-sided game in young soccer players: the influence of different team formation methods.

    PubMed

    Köklü, Yusuf; Ersöz, Gülfem; Alemdaroğlu, Utku; Aşç, Alper; Ozkan, Ali

    2012-11-01

    The purpose of this study was to examine the influence of different team formation methods on the physiological responses to and time-motion characteristics of 4-a-side small-sided games (SSG4) in young soccer players. Thirty-two young soccer players (age 16.2 ± 0.7 years; height 172.9 ± 6.1 cm; body mass 64.1 ± 7.7 kg) voluntarily participated in this study. Anthropometric measurements, technical tests, and maximum oxygen uptake (V[Combining Dot Above]O2max) tests were carried out on the players. The SSG4 teams were then created using 4 different methods: according to the coaches' subjective evaluation (CE), technical scores (TS), V[Combining Dot Above]O2max (AP), and V[Combining Dot Above]O2max multiplied by TSs (CG). The teams thus created played 4 bouts of SSG4 at 2-day intervals. During the SSG4, heart rate (HR) responses, distance covered, and time spent in HRmax zones were recorded. In addition, rating of perceived exertion (RPE) and blood lactate level (La) were determined at the end of the last bout of each SSG4. Percent of HRmax (%HRmax), La, and RPE responses during SSG4 were significantly higher for teams chosen according to AP and CG compared with that according to CE and TS (p < 0.05). In addition, teams chosen by AP and CG spent significantly more time in zone 4 (>90% HRmax ) and covered a greater distance in the high-intensity running zone (>18 km·h) than did teams formed according to TS. Moreover, AP teams covered significantly greater total distance than TS teams did (p < 0.05). In conclusion, to spend more time in both the high-intensity HR zone and the high-intensity running zone, the teams in SSG4 should be formed according to the players' V[Combining Dot Above]O2max values or the values calculated using both the V[Combining Dot Above]O2max and technique scores.

  8. Project T.E.A.M. (Technical Education Advancement Modules). Introduction to Statistical Process Control.

    ERIC Educational Resources Information Center

    Billings, Paul H.

    This instructional guide, one of a series developed by the Technical Education Advancement Modules (TEAM) project, is a 6-hour introductory module on statistical process control (SPC), designed to develop competencies in the following skill areas: (1) identification of the three classes of SPC use; (2) understanding a process and how it works; (3)…

  9. Solar 101 Webinar Series: Solar Technical Assistance Overview and

    Science.gov Websites

    Technical Assistance Overview and Applications Solar 101 Webinar Series: Solar Technical Assistance Overview and Applications Wednesday, March 5, 2014, 2-3 p.m. EST NREL's Solar Technical Assistance Team (STAT ) presented a live webinar titled, "Solar Technical Assistance Overview and Applications." This

  10. State Solar Technical Assistance | State, Local, and Tribal Governments |

    Science.gov Websites

    NREL State Solar Technical Assistance State Solar Technical Assistance Request Assistance Subscribe to Email Updates NREL provides direct technical assistance to state and local governments on expert testimony on policy best practices. The Solar Technical Assistance Team (STAT) Network is designed

  11. Boarding Team Communications Phase I: Product Development and Evaluation

    DTIC Science & Technology

    2007-05-01

    U.S. Coast Guard Research and Development Center 1082 Shennecossett Road, Groton, CT 06340-6048 Report No. CG-D-04-2007 Template: Report Cover...Technical Director United States Coast Guard Research & Development Center 1082 Shennecossett Road Groton, CT 06340-6048 Template...Research and Development Center 11. Contract or Grant No. 1082 Shennecossett Road Fairfax, VA 22030 Groton, CT 06340-6048 13. Type of

  12. Evaluation of a Game-Based Simulation During Distributed Exercises

    DTIC Science & Technology

    2010-09-01

    the management team guiding development of the software. The questionnaires have not been used enough to collect data sufficient for factor...capable of internationally distributed exercises without excessive time lags or technical problems, given that commercial games seem to manage while...established by RDECOM-STTC military liaison and managers . Engineering constraints combined to limit the number of participants and the possible roles that

  13. The evaluator as technical assistant: A model for systemic reform support

    NASA Astrophysics Data System (ADS)

    Century, Jeanne Rose

    This study explored evaluation of systemic reform. Specifically, it focused on the evaluation of a systemic effort to improve K-8 science, mathematics and technology education. The evaluation was of particular interest because it used both technical assistance and evaluation strategies. Through studying the combination of these roles, this investigation set out to increase understanding of potentially new evaluator roles, distinguish important characteristics of the evaluator/project participant relationship, and identify how these roles and characteristics contribute to effective evaluation of systemic science education reform. This qualitative study used interview, document analysis, and participant observation as methods of data collection. Interviews were conducted with project leaders, project participants, and evaluators and focused on the evaluation strategies and process, the use of the evaluation, and technical assistance. Documents analyzed included transcripts of evaluation team meetings and reports, memoranda and other print materials generated by the project leaders and the evaluators. Data analysis consisted of analytic and interpretive procedures consistent with the qualitative data collected and entailed a combined process of coding transcripts of interviews and meetings, field notes, and other documents; analyzing and organizing findings; writing of reflective and analytic memos; and designing and diagramming conceptual relationships. The data analysis resulted in the development of the Multi-Function Model for Systemic Reform Support. This model organizes systemic reform support into three functions: evaluation, technical assistance, and a third, named here as "systemic perspective." These functions work together to support the project's educational goals as well as a larger goal--building capacity in project participants. This model can now serve as an informed starting point or "blueprint" for strategically supporting systemic reform.

  14. A large-scale mass casualty simulation to develop the non-technical skills medical students require for collaborative teamwork.

    PubMed

    Jorm, Christine; Roberts, Chris; Lim, Renee; Roper, Josephine; Skinner, Clare; Robertson, Jeremy; Gentilcore, Stacey; Osomanski, Adam

    2016-03-08

    There is little research on large-scale complex health care simulations designed to facilitate student learning of non-technical skills in a team-working environment. We evaluated the acceptability and effectiveness of a novel natural disaster simulation that enabled medical students to demonstrate their achievement of the non-technical skills of collaboration, negotiation and communication. In a mixed methods approach, survey data were available from 117 students and a thematic analysis undertaken of both student qualitative comments and tutor observer participation data. Ninety three per cent of students found the activity engaging for their learning. Three themes emerged from the qualitative data: the impact of fidelity on student learning, reflexivity on the importance of non-technical skills in clinical care, and opportunities for collaborative teamwork. Physical fidelity was sufficient for good levels of student engagement, as was sociological fidelity. We demonstrated the effectiveness of the simulation in allowing students to reflect upon and evidence their acquisition of skills in collaboration, negotiation and communication, as well as situational awareness and attending to their emotions. Students readily identified emerging learning opportunities though critical reflection. The scenarios challenged students to work together collaboratively to solve clinical problems, using a range of resources including interacting with clinical experts. A large class teaching activity, framed as a simulation of a natural disaster is an acceptable and effective activity for medical students to develop the non-technical skills of collaboration, negotiation and communication, which are essential to team working. The design could be of value in medical schools in disaster prone areas, including within low resource countries, and as a feasible intervention for learning the non-technical skills that are needed for patient safety.

  15. Factors affecting team leadership skills and their relationship with quality of cardiopulmonary resuscitation.

    PubMed

    Yeung, Joyce H Y; Ong, G J; Davies, Robin P; Gao, Fang; Perkins, Gavin D

    2012-09-01

    This study aims to explore the relationship between team-leadership skills and quality of cardiopulmonary resuscitation in an adult cardiac-arrest simulation. Factors affecting team-leadership skills were also assessed. Forty advanced life-support providers leading a cardiac arrest team in a standardized cardiac-arrest simulation were videotaped. Background data were collected, including age (in yrs), sex, whether they had received any leadership training in the past, whether they were part of a professional group, the most recent advanced life-support course (in months) they had undergone, advanced life-support instructor/provider status, and whether they had led in any cardiac arrest situation in the preceding 6 months. Participants were scored using the Cardiac Arrest Simulation test score and Leadership Behavior Description Questionnaire for leadership skills. Process-focused quality of cardiopulmonary resuscitation data were collected directly from manikin and video recordings. Primary outcomes were complex technical skills (measured as Cardiac Arrest Simulation test score, preshock pause, and hands-off ratio). Secondary outcomes were simple technical skills (chest-compression rate, depth, and ventilation rate). Univariate linear regressions were performed to examine how leadership skills affect quality of cardiopulmonary resuscitation and bivariate correlations elicited factors affecting team-leadership skills.Teams led by leaders with the best leadership skills performed higher quality cardiopulmonary resuscitation with better technical performance (R = 0.75, p < .001), shorter preshock pauses (R = 0.18, p < .001), with lower total hands-off ratio (R = 0.24, p = .01), and shorter time to first shock (R = 0.14, p = .02). Leadership skills were not significantly associated with more simple technical skills such as chest-compression rate, depth, and ventilation rate. Prior training in team leader skills was independently associated with better leadership behavior. There is an association between team leadership skills and cardiac arrest simulation test score, preshock pause, and hands off ratio. Developing leadership skills should be considered an integral part of resuscitation training.

  16. Do failures in non-technical skills contribute to fatal medical accidents in Japan? A review of the 2010-2013 national accident reports.

    PubMed

    Uramatsu, Masashi; Fujisawa, Yoshikazu; Mizuno, Shinya; Souma, Takahiro; Komatsubara, Akinori; Miki, Tamotsu

    2017-02-16

    We sought to clarify how large a proportion of fatal medical accidents can be considered to be caused by poor non-technical skills, and to support development of a policy to reduce number of such accidents by making recommendations about possible training requirements. Summaries of reports of fatal medical accidents, published by the Japan Medical Safety Research Organization, were reviewed individually. Three experienced clinicians and one patient safety expert conducted the reviews to determine the cause of death. Views of the patient safety expert were given additional weight in the overall determination. A total of 73 summary reports of fatal medical accidents were reviewed. These reports had been submitted by healthcare organisations across Japan to the Japan Medical Safety Research Organization between April 2010 and March 2013. The cause of death in fatal medical accidents, categorised into technical skills, non-technical skills and inevitable progress of disease were evaluated. Non-technical skills were further subdivided into situation awareness, decision making, communication, team working, leadership, managing stress and coping with fatigue. Overall, the cause of death was identified as non-technical skills in 34 cases (46.6%), disease progression in 33 cases (45.2%) and technical skills in two cases (5.5%). In two cases, no consensual determination could be achieved. Further categorisation of cases of non-technical skills were identified as 14 cases (41.2%) of problems with situation awareness, eight (23.5%) with team working and three (8.8%) with decision making. These three subcategories, or combinations of them, were identified as the cause of death in 33 cases (97.1%). Poor non-technical skills were considered to be a significant cause of adverse events in nearly half of the fatal medical accidents examined. Improving non-technical skills may be effective for reducing accidents, and training in particular subcategories of non-technical skills may be especially relevant. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/.

  17. Leadership, governance and partnerships are essential One Health competencies.

    PubMed

    Stephen, Craig; Stemshorn, Barry

    2016-12-01

    One Health is held as an approach to solve health problems in this era of complexity and globalization, but inadequate attention has been paid to the competencies required to build successful teams and programs. Most of the discussion on developing One Health teams focuses on creating cross-disciplinary awareness and technical skills. There is, however, evidence that collaborative, multi-disciplinary teams need skills, processes and institutions that enable policy and operations to be co-managed and co-delivered across jurisdictions. We propose that competencies in leadership and human resources; governance and infrastructure; and partnership and stakeholder engagement are essential, but often overlooked One Health attributes. Competencies in these staple attributes of leadership and management need to be more prominent in training and One Health capacity development. Although One Health has been in existence for over a decade, there has been no systematic evaluation of the essential attributes of successful and sustainable One Health programs. As such, much of this paper borrows from experience in other sectors dealing with complex, cross and inter-sectoral problems. Our objective is to advocate for increased investment in One Health leadership, governance and partnership skills to balance the focus on creating cross-disciplinary awareness and technical proficiency in order to maintain One Health as a viable approach to health issues at the human-animal-environment interface.

  18. Tag team simulation: An innovative approach for promoting active engagement of participants and observers during group simulations.

    PubMed

    Levett-Jones, Tracy; Andersen, Patrea; Reid-Searl, Kerry; Guinea, Stephen; McAllister, Margaret; Lapkin, Samuel; Palmer, Lorinda; Niddrie, Marian

    2015-09-01

    Active participation in immersive simulation experiences can result in technical and non-technical skill enhancement. However, when simulations are conducted in large groups, maintaining the interest of observers so that they do not disengage from the learning experience can be challenging. We implemented Tag Team Simulation with the aim of ensuring that both participants and observers had active and integral roles in the simulation. In this paper we outline the features of this innovative approach and provide an example of its application to a pain simulation. Evaluation was conducted using the Satisfaction with Simulation Experience Scale. A total of 444 year nursing students participated from a population of 536 (response rate 83%). Cronbach's alpha for the Scale was .94 indicating high internal consistency. The mean satisfaction score for participants was 4.63 compared to 4.56 for observers. An independent sample t test revealed no significant difference between these scores (t (300) = -1.414, p = 0.16). Tag team simulation is an effective approach for ensuring observers' and participants' active involvement during group-based simulations and one that is highly regarded by students. It has the potential for broad applicability across a range of leaning domains both within and beyond nursing. Copyright © 2015 Elsevier Ltd. All rights reserved.

  19. Integration of Hands-On Team Training into Existing Curriculum Improves Both Technical and Nontechnical Skills in Laparoscopic Cholecystectomy.

    PubMed

    Caskey, Robert C; Owei, Lily; Rao, Raghavendra; Riddle, Elijah W; Brooks, Ari D; Dempsey, Daniel T; Morris, Jon B; Neylan, Christopher J; Williams, Noel N; Dumon, Kristoffel R

    Nontechnical skills are an essential component of surgical education and a major competency assessed by the ACGME milestones project. However, the optimal way to integrate nontechnical skills training into existing curricula and then objectively evaluate the outcome is still unknown. The aim of this study was to determine the effect laparoscopic team-based task training would have on the nontechnical skills needed for laparoscopic surgery. 9 PGY-1 residents underwent an established training curriculum for teaching the knowledge and technical skills involved in laparoscopic cholecystectomy. Initial training involved a didactic session, expert-led practice on a porcine model in a simulated operating room and laparoscopic skills practice on a virtual reality trainer. Residents then performed a laparoscopic cholecystectomy on the same porcine model as a preintervention test. Three to four months following this, residents were subjected to specific nontechnical skills training involving 2 simple team-based laparoscopic tasks. They then practiced a further 4 to 6 hours on the virtual reality trainer. A repeat postintervention laparoscopic cholecystectomy was then performed 3 to 4 months after nontechnical skills training. Both the preintervention and postintervention laparoscopic cholecystectomies were audiovisually recorded and then evaluated by 2 independent surgeons in a blinded fashion. Technical skills were assessed using objective structured assessment of technical skills (OSATS) and a technique specific rating scale (TRS) that we developed for laparoscopic cholecystectomy. Nontechnical skills were assessed using nontechnical skills for surgeons (NOTSS). Residents also completed a survey at the beginning and end of the training. Tertiary care, university based teaching institution. A total of 9 general surgery residents at the intern level. The mean OSATS score improved from 13.7 ± 1.24 to 26.7 ± 0.31 (p < 0.001), the mean TRS score improved from 6 ± 0.46 to 13.1 ± 0.36 (p < 0.001) and the mean NOTSS score improved from 21.7 ± 1.83 to 36.3 ± 0.87 (p < 0.001) following the training. There was a strong correlation between OSATS and NOTSS scores (Pearson's R = 0.98) and TRS and NOTSS (R = 0.94). The inter-rater agreement was 0.79 for NOTSS, 0.9 for OSATS, and 0.82 for TRS. Following completion of the training, residents self-reported improvements in exchanging information (p < 0.01), coordinating activities (p < 0.01) and coping with pressure in the operating room (p < 0.001). Simple, team-based nontechnical skills training for laparoscopic cholecystectomy that was separate from technical skills training led to a sustained increase in residents' nontechnical skills 3 to 4 months after training. This was associated with a self-reported improvement in many nontechnical skills based on resident survey. Based on these results, we recommend that such designated nontechnical skills training is a valid alternative to other methods such as coaching and debriefing. We, therefore, plan to continue our efforts to develop team-based simulation tasks aimed at improving nontechnical skills for multiple surgical modalities. Copyright © 2017 Association of Program Directors in Surgery. Published by Elsevier Inc. All rights reserved.

  20. NESC Independent Review of the Mars Reconnaissance Orbiter (MRO) Contamination Thermal/Vacuum (T/V) Anomaly Technical Consultation Report

    NASA Technical Reports Server (NTRS)

    Sutter, James K.; Leidecker, Henning W.; Panda, Binayak; Piascik, Robert S.; Muirhead, Brian K.; Peeler, Debra

    2009-01-01

    The NESC eras requested by the NASA Jet Propulsion Laboratory (JPL) to conduct an independent review of the Mars Reconnaissance Orbiter (MRO) Thermal/Vacuum (T/V) Anomaly Assessment. Because the anomaly resulted in the surface contamination of the MRO, selected members of the Materials Super Problem Resolution Team (SPRT) and the NASA technical community having technical expertise relative to contamination issues were chosen for the independent review. The consultation consisted of a review of the MRO Project's reported response to the assessment findings, a detailed review of JPL technical assessment final report, and detailed discussions with the JPL assessment team relative to their findings.

  1. Inequity-aversion and relative kindness intention jointly determine the expenditure of effort in project teams.

    PubMed

    Han, Jiaojie; Rapoport, Amnon; Zhao, Rui

    2017-01-01

    The literature on team cooperation has neglected the effects of relative kindness intention on cooperation, which we measure by comparing the kindness intentions of an agent to her group members to the kindness shown by other members to this same agent. We argue that the agent's emotional reaction to material payoff inequity is not constant, but rather affected by her relative kindness intention. Then, we apply the model to team projects with multiple partners and investigate how inequity-aversion and relative kindness intention jointly influence team cooperation. We first consider the case of homogeneous agents, where their marginal productivity levels and technical capacities are the same, and then consider the case of heterogeneous agents, where their marginal productivity levels and technical capacities are not the same. Our results show that inequity-aversion has no effect on effort expenditure in the former case, but does affect it in the latter case. The consideration of relative kindness intention may impact the agents' optimal cooperative effort expenditure when their technical capacities are different. In addition, it is beneficial for team cooperation, and might not only reduce the negative impact but also enhance the positive impact of inequity-aversion on the agents' effort expenditures.

  2. Change champions at the grassroots level: practice innovation using team process.

    PubMed

    Scott, J; Rantz, M

    1994-01-01

    A nursing administrative group recognized the critical value of staff participation in the formulation of a restructuring project and guidance throughout the project. Using a team approach, a task force of three staff nurses, two assistant nurse managers, a nurse clinician, a nursing practice specialist, and a representative from nursing administration came together. They were given responsibility for researching and setting the course for restructuring change. A unit-based team including a unit secretary, a nursing attendant, licensed practical nurse (LPN), and six staff nurses was formed from volunteers from the 40-bed medicine unit to develop that unit's plan for restructuring. The unit-based team analyzed patient care needs and staff member roles. They created a new patient care technician role as well as a nurse care coordinator role. The role of the LPN was envisioned as providing technical support. Staffing mix was also determined by the unit-based team. Both the task force and the unit-based team continue to evaluate, troubleshoot, and take every opportunity to sell their vision to solidify it further as the foundation for the future of patient care services at the hospital. The process will soon move forward to a large surgical unit.

  3. Developing a network: the PMM process.

    PubMed

    Kamara, A

    1997-11-01

    Since 1988, the Prevention of Maternal Mortality (PMM) Network has developed, implemented and evaluated projects that focus directly on prevention of maternal deaths. The Network, which consists of 11 multidisciplinary teams in West Africa and one at Columbia University, grew from discussions between the Carnegie Corporation of New York and researchers at Columbia School of Public Health. Its goals are: to strengthen capacities in developing countries; to provide program models for preventing maternal deaths; and to inform policymakers about the importance of maternal mortality. This paper describes the development and functioning of the Network. The initial steps included identifying interested partners in Africa and encouraging them to form multidisciplinary teams. Each African team received two grants: one to perform a needs assessment and then another to develop and implement projects based on the results. The Columbia team provided technical assistance in a variety of ways, including site visits, workshops and correspondence. Teams tested program models and reported findings both to local policymakers and in international fora. Collaboration with government and community leaders helped facilitate progress at all stages. At the PMM Network Results Conference in 1996, the teams decided to continue their work by forming the Regional PMM (RPMM) Network, an entirely African entity.

  4. The effectiveness of crisis resource management and team debriefing in resuscitation education of nursing students: A randomised controlled trial.

    PubMed

    Coppens, Imgard; Verhaeghe, Sofie; Van Hecke, Ann; Beeckman, Dimitri

    2018-01-01

    The aim of this study was to investigate (i) whether integrating a course on crisis resource management principles and team debriefings in simulation training, increases self-efficacy, team efficacy and technical skills of nursing students in resuscitation settings and (ii) which phases contribute the most to these outcomes. Crisis resource management principles have been introduced in health care to optimise teamwork. Simulation training offers patient safe training opportunities. There is evidence that simulation training increases self-efficacy and team efficacy but the contribution of the different phases like crisis resource management principles, simulation training and debriefing on self-efficacy, team efficacy and technical skills is not clear. Randomised controlled trial in a convenience sample (n = 116) in Belgium. Data were collected between February 2015-April 2015. Participants in the intervention group (n = 60) completed a course on crisis resource management principles, followed by a simulation training session, a team debriefing and a second simulation training session. Participants in the control group (n = 56) only completed two simulation training sessions. The outcomes self-efficacy, team efficacy and technical skills were assessed after each simulation training. An ancillary analysis of the learning effect was conducted. The intervention group increased on self-efficacy (2.13%, p = .02) and team efficacy (9.92%, p < .001); the control group only increased significantly on team efficacy (4.5%, p = .001). The intervention group scored significantly higher on team efficacy (8.49%, p < .001) compared to the control group. Combining crisis resource management principles and team debriefings in simulation training increases self-efficacy and team efficacy. The debriefing phase contributes the most to these effects. By partnering with healthcare settings, it becomes possible to offer interdisciplinary simulation training that can increase patient safety. © 2017 John Wiley & Sons Ltd.

  5. Enhancing Team Performance for Long-Duration Space Missions

    NASA Technical Reports Server (NTRS)

    Orasanu, Judith M.

    2009-01-01

    Success of exploration missions will depend on skilled performance by a distributed team that includes both the astronauts in space and Mission Control personnel. Coordinated and collaborative teamwork will be required to cope with challenging complex problems in a hostile environment. While thorough preflight training and procedures will equip creW'S to address technical problems that can be anticipated, preparing them to solve novel problems is much more challenging. This presentation will review components of effective team performance, challenges to effective teamwork, and strategies for ensuring effective team performance. Teamwork skills essential for successful team performance include the behaviors involved in developing shared mental models, team situation awareness, collaborative decision making, adaptive coordination behaviors, effective team communication, and team cohesion. Challenges to teamwork include both chronic and acute stressors. Chronic stressors are associated with the isolated and confined environment and include monotony, noise, temperatures, weightlessness, poor sleep and circadian disruptions. Acute stressors include high workload, time pressure, imminent danger, and specific task-related stressors. Of particular concern are social and organizational stressors that can disrupt individual resilience and effective mission performance. Effective team performance can be developed by training teamwork skills, techniques for coping with team conflict, intracrew and intercrew communication, and working in a multicultural team; leadership and teamwork skills can be fostered through outdoor survival training exercises. The presentation will conclude with an evaluation of the special requirements associated with preparing crews to function autonomously in long-duration missions.

  6. 15 CFR 270.205 - Reports.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... STANDARDS AND TECHNOLOGY, DEPARTMENT OF COMMERCE NATIONAL CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Investigations § 270.205 Reports. (a) Not later than 90 days after completing an investigation, a Team shall issue a public report which includes: (1) An analysis of the likely technical cause...

  7. 15 CFR 270.205 - Reports.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... STANDARDS AND TECHNOLOGY, DEPARTMENT OF COMMERCE NATIONAL CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Investigations § 270.205 Reports. (a) Not later than 90 days after completing an investigation, a Team shall issue a public report which includes: (1) An analysis of the likely technical cause...

  8. Oregon Sustainability Center: Weighing Approaches to Net Zero

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Regnier, Cindy; Robinson, Alastair; Settlemyre, Kevin

    2013-10-01

    The Oregon Sustainability Center (OSC) was to represent a unique public/private partnership between the city of Portland, Oregon, state government, higher education, non-profit organizations, and the business community. A unique group of stakeholders partnered with the U.S. Department of Energy (DOE) technical expert team (TET) to collaboratively identify, analyze, and evaluate solutions to enable the OSC to become a high-performance sustainability landmark in downtown Portland. The goal was to build a new, low-energy mixed-use urban high-rise that consumes at least 50 percent less energy than requirements set by Energy Standard 90.1-2007 of the American Society of Heating, Refrigerating, and Air-Conditioningmore » Engineers (ASHRAE), the American National Standards Institute (ANSI), and the Illuminating Engineering Society of America (IESNA) as part of DOE’s Commercial Building Partnerships (CBP) program.1 In addition, the building design was to incorporate renewable energy sources that would account for the remaining energy consumption, resulting in a net zero building. The challenge for the CBP DOE technical team was to evaluate factors of risk and components of resiliency in the current net zero energy design and analyze that design to see if the same high performance could be achieved by alternative measures at lower costs. In addition, the team was to use a “lens of scalability” to assess whether or not the strategies could be applied to more projects. However, a key component of the required project funding did not pass, and therefore this innovative building design was discontinued while it was in the design development stage.« less

  9. Cardiac arrest leadership: in need of resuscitation?

    PubMed

    Robinson, Philip S; Shall, Emma; Rakhit, Roby

    2016-12-01

    Leadership skills directly correlate with the quality of technical performance of cardiopulmonary resuscitation (CPR) and clinical outcomes. Despite an improved focus on non-technical skills in CPR training, the leadership of cardiac arrests is often variable. To assess the perceptions of leadership and team working among members of a cardiac arrest team and to evaluate future training needs. Cross-sectional survey of 102 members of a cardiac arrest team at an Acute Hospital Trust in the UK with 892 inpatient beds. Responses sought from doctors, nurses and healthcare assistants to 12 rated statements and 4 dichotomous questions. Of 102 responses, 81 (79%) were from doctors and 21 (21%) from nurses. Among specialist registrars 90% agreed or strongly agreed that there was clear leadership at all arrests compared with between 28% and 49% of nurses and junior doctors respectively. Routine omission of key leadership tasks was reported by as many as 80% of junior doctors and 50% of nurses. Almost half of respondents reported non-adherence with Advanced Life Support (ALS) guidelines. Among junior members of the team, 36% felt confident to lead an arrest and 75% would welcome further dedicated cardiac arrest leadership training. Leadership training is integrated into the ALS (Resus Council, UK) qualification. However, this paper found that in spite of this training; standards of leadership are variable. The findings suggest a pressing need for further dedicated cardiac arrest leadership training with a focus on improving key leadership tasks such as role assignment, team briefing and debriefing. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/.

  10. Performance indicators related to points scoring and winning in international rugby sevens.

    PubMed

    Higham, Dean G; Hopkins, Will G; Pyne, David B; Anson, Judith M

    2014-05-01

    Identification of performance indicators related to scoring points and winning is needed to inform tactical approaches to international rugby sevens competition. The aim of this study was to characterize team performance indicators in international rugby sevens and quantify their relationship with a team's points scored and probability of winning. Performance indicators of each team during 196 matches of the 2011/2012 International Rugby Board Sevens World Series were modeled for their linear relationships with points scored and likelihood of winning within (changes in team values from match to match) and between (differences between team values averaged over all matches) teams. Relationships were evaluated as the change and difference in points and probability of winning associated with a two within- and between-team standard deviations increase in performance indicator values. Inferences about relationships were assessed using a smallest meaningful difference of one point and a 10% probability of a team changing the outcome of a close match. All indicators exhibited high within-team match-to-match variability (intraclass correlation coefficients ranged from 0.00 to 0.23). Excluding indicators representing points-scoring actions or events occurring on average less than once per match, 13 of 17 indicators had substantial clear within-team relationships with points scored and/or likelihood of victory. Relationships between teams were generally similar in magnitude but unclear. Tactics that increase points scoring and likelihood of winning should be based on greater ball possession, fewer rucks, mauls, turnovers, penalties and free kicks, and limited passing. Key pointsSuccessful international rugby sevens teams tend to maintain ball possession; more frequently avoid taking the ball into contact; concede fewer turnovers, penalties and free kicks; retain possession in scrums, rucks and mauls; and limit passing the ball.Selected performance indicators may be used to evaluate team performances and plan more effective tactical approaches to competition.There is greater match-to-match variability in performance indicator values within than between international rugby sevens teams.The priorities for a rugby sevens team's technical and tactical preparation should reflect the magnitudes of the relationships between performance indicators, points scoring and the likelihood of winning.

  11. Predicting Player Position for Talent Identification in Association Football

    NASA Astrophysics Data System (ADS)

    Razali, Nazim; Mustapha, Aida; Yatim, Faiz Ahmad; Aziz, Ruhaya Ab

    2017-08-01

    This paper is set to introduce a new framework from the perspective of Computer Science for identifying talents in the sport of football based on the players’ individual qualities; physical, mental, and technical. The combination of qualities as assessed by coaches are then used to predict the players’ position in a match that suits the player the best in a particular team formation. Evaluation of the proposed framework is two-fold; quantitatively via classification experiments to predict player position, and qualitatively via a Talent Identification Site developed to achieve the same goal. Results from the classification experiments using Bayesian Networks, Decision Trees, and K-Nearest Neighbor have shown an average of 98% accuracy, which will promote consistency in decision-making though elimination of personal bias in team selection. The positive reviews on the Football Identification Site based on user acceptance evaluation also indicates that the framework is sufficient to serve as the basis of developing an intelligent team management system in different sports, whereby growth and performance of sport players can be monitored and identified.

  12. TEAM TRAINING. FINAL TECHNICAL REPORT FEBRUARY 1966-FEBRUARY 1967.

    ERIC Educational Resources Information Center

    BRIGGS, GEORGE E.; JOHNSTON, WILLIAM A.

    THIS IS THE FINAL REPORT ON A FOUR-YEAR PROGRAM OF LABORATORY RESEARCH ON TEAM TRAINING IN A COMBAT INFORMATION CENTER (CIC) CONTEXT. THE RESEARCH LITERATURE ON TEAM TRAINING IS REVIEWED, AND A SET OF CONCLUSIONS IS DRAWN WITH REGARD TO TEAM PERFORMANCE AS A FUNCTION OF TASK, TRAINING, AND COMMUNICATIONS VARIABLES. IN ADDITION, THE IMPLICATIONS…

  13. 7 CFR Appendix C to Subpart B of... - Technical Report for Hydropower Projects

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ...,000 require the services of a licensed professional engineer (PE) or team of PEs. Depending on the... services of a licensed PE or a team of licensed PEs may be required for smaller projects. (a) Qualifications of project team. The hydropower project team should consist of a system designer, a project...

  14. 7 CFR Appendix C to Subpart B of... - Technical Report for Hydropower Projects

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ...,000 require the services of a licensed professional engineer (PE) or team of PEs. Depending on the... services of a licensed PE or a team of licensed PEs may be required for smaller projects. (a) Qualifications of project team. The hydropower project team should consist of a system designer, a project...

  15. 7 CFR Appendix C to Subpart B of... - Technical Report for Hydropower Projects

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ...,000 require the services of a licensed professional engineer (PE) or team of PEs. Depending on the... services of a licensed PE or a team of licensed PEs may be required for smaller projects. (a) Qualifications of project team. The hydropower project team should consist of a system designer, a project...

  16. Perturbed Communication in a Virtual Environment to Train Medical Team Leaders.

    PubMed

    Huguet, Lauriane; Lourdeaux, Domitile; Sabouret, Nicolas; Ferrer, Marie-Hélène

    2016-01-01

    The VICTEAMS project aims at designing a virtual environment for training medical team leaders to non-technical skills. The virtual environment is populated with autonomous virtual agents who are able to make mistakes (in action or communication) in order to train rescue team leaders and to make them adaptive with all kinds of situations or teams.

  17. Evaluation and Validation (E&V) Team Public Report. Volume 1.

    DTIC Science & Technology

    1984-11-30

    Components. .......... K-109 *Table K-6. Possible Approaches to Integrating Methodology Components Across Life Cycle Phases. .........K-109 SECTION I...provide a detailed and organized approach to the development of technology which will be used as a basis for the E&V of APSEs. The E&V Plan which is...A-4 1.2 Background ....... .................. A-6 2. SCOPE ...... ....................... A-8 3. E&V TECHNICAL APPROACH

  18. Unmanned Tactical Autonomous Control and Collaboration Threat and Vulnerability Assessment

    DTIC Science & Technology

    2015-06-01

    they are evaluated separately 15 from each other [19]. One major difference between this classification method and the FIPS 199 is that no...both technical and nontechnical methods ” [31]. These different methods will enable the UTACC system to effectively mitigate vulnerabilities that...team. Marines on the battlefield communicate with each other in many different and unique methods . UTACC must be adaptable to these different methods

  19. Proficiency Testing Activities of Frequency Calibration Laboratories in Taiwan, 2009

    DTIC Science & Technology

    2009-11-01

    cht.com.tw Abstract In order to meet the requirements of ISO 17025 and the demand of TAF (Taiwan Accreditation Foundation) for calibration inter... IEC 17025 General requirements for the competence of testing and calibration laboratories. The proficiency testing results are then important...on-site evaluation, an assessment team is organized to examine the technical competence of the labs and their compliance with the requirements of ISO

  20. Evaluation of Cardiopulmonary Factors Critical to Successful Emergency Perinatal Air Transport

    DTIC Science & Technology

    1982-03-01

    the pregnant mother or the neonate ; adjunct medical training of transport pilots; exclusive use of multiengine, fixed-wing, all- weather aircraft; and...Document is available to the public neonate , Emergency air transport, Cardio- through the National Technical pulmonary factors, Medical transport team...manuscript. ti List of Abbreviations HRPW High-risk pregnant woman HRN High-risk neonate CD Communications and dispatch RN Registered nurse mph Miles per

  1. Evaluation and Validation (E&V) Team Public Report. Volume 5

    DTIC Science & Technology

    1990-10-31

    aspects, software engineering practices, etc. The E&V requirements which are developed will be used to guide the E&V technical effort. The currently...interoperability of Ada software engineering environment tools and data. The scope of the CAIS-A includes the functionality affecting transportability that is...requirement that they be CAIS conforming tools or data. That is, for example numerous CIVC data exist on special purpose software currently available

  2. Direct heat geothermal opportunities at Pahoa, Hawaii

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Moreau, J.; Jones, W.L.

    1980-09-01

    A geothermal commercial park located near Pahoa, Hawaii, has been found to be technically feasible. However, community acceptance varies from optimistic support for the job opportunities to only lukewarm acceptance by most residents of the nearby planned residential community. Interviews, team evaluations, and calculations of energy and transportation savings were used to reduce a list of candidate processes to four. These four include an ethanol plant, a cattle feed mill, a protein recovery plant, and a papaya processing facility. In addition, a research laboratory is planned for the evaluation of other processes identified as very promising.

  3. [Evaluation of the lifestyle of students of physiotherapy and technical & computer science basing on their diet and physical activity].

    PubMed

    Medrela-Kuder, Ewa

    2011-01-01

    The aim of the study was the evaluation of a dietary habits profile and physical activity of Physiotherapy and Technical & Computer Science students. The research involved a group of 174 non-full-time students of higher education institutions in Krakow aged between 22 and 27. 81 students of the surveyed studied Physiotherapy at the University of Physical Education, whereas 93 followed a course in Technical & Computer Science at the Pedagogical University. In this project a diagnostic survey method was used. The study revealed that the lifestyle of university youth left much to be desired. Dietary errors were exemplified by irregular meals intake, low consumption of fish, milk and dairy, snacking between meals on high calorie products with a poor nutrient content. With regard to physical activity, Physiotherapy students were characterised by more positive attitudes than those from Technical & Computer Science. Such physical activity forms as swimming, team sports, cycling and strolling were declared by the surveyed the most frequently. Health-oriented education should be introduced in such a way as to improve the knowledge pertaining to a health-promoting lifestyle as a means of prevention of numerous diseases.

  4. Environment, Safety and Health Self-Assessment Report Fiscal Year 2010

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Robinson, Scott

    2011-03-23

    The Lawrence Berkeley National Laboratory (LBNL) Environment, Safety, and Health (ES&H) Self-Assessment Program was established to ensure that Integrated Safety Management (ISM) is implemented institutionally and by all divisions. The ES&H Self-Assessment Program, managed by the Office of Contractor Assurance (OCA), provides for an internal evaluation of all ES&H programs and systems at LBNL. The primary objective of the program is to ensure that work is conducted safely and with minimal negative impact to workers, the public, and the environment. Self-assessment follows the five core functions and guiding principles of ISM. Self-assessment is the mechanism used to promote the continuousmore » improvement of the Laboratory's ES&H programs. The process is described in the Environment, Safety, and Health Assurance Plan (PUB-5344) and is composed of three types of self-assessments: Division ES&H Self-Assessment, ES&H Technical Assurance Program Assessment, and Division ES&H Peer Review. The Division ES&H Self-Assessment Manual (PUB-3105) provides the framework by which divisions conduct formal ES&H self-assessments to systematically identify program deficiencies. Issue-specific assessments are designed and implemented by the divisions and focus on areas of interest to division management. They may be conducted by teams and involve advance planning to ensure that appropriate resources are available. The ES&H Technical Assurance Program Manual (PUB-913E) provides the framework for systematic reviews of ES&H programs and processes. The ES&H Technical Assurance Program Assessment is designed to evaluate whether ES&H programs and processes are compliant with guiding regulations, are effective, and are properly implemented by LBNL divisions. The Division ES&H Peer Review Manual provides the framework by which division ISM systems are evaluated and improved. Peer Reviews are conducted by teams under the direction of senior division management and focus on higher-level management issues. Peer Review teams are selected on the basis of members knowledge and experience in the issues of interest to the division director. LBNL periodically requests in-depth independent assessments of selected ES&H programs. Such assessments augment LBNL's established assessment processes and provide an objective view of ES&H program effectiveness. Institutional Findings, Observations, and Noteworthy Practices identified during independent assessments are specifically intended to help LBNL identify opportunities for program improvement. This report includes the results of the Division ES&H Self-Assessment, ES&H Technical Assurance Program Assessment, and Division ES&H Peer Review, respectively.« less

  5. Association of Physical and Technical Activities With Partial Match Status in a Soccer Professional Team.

    PubMed

    Moalla, Wassim; Fessi, Mohamed Saieffedin; Makni, Emna; Dellal, Alexandre; Filetti, Cristoforo; Di Salvo, Valter; Chamari, Karim

    2018-06-01

    Moalla, W, Fessi, MS, Makni, E, Dellal, A, Filetti, C, Di Salvo, V, and Chamari, K. Association of physical and technical activities with partial match status in a soccer professional team. J Strength Cond Res 32(6): 1708-1714, 2018-The purpose of this study was to examine the association between physical and technical activities and partial match status (winning, drawing, or losing) in a professional soccer team over 2 seasons. Physical and technical activities of 52 official matches were collected and analyzed at each 15-minute interval, for each half (45 minutes), and full match (90 minutes) using a multiple-camera computerized tracking system. The results indicated that according to full match outcome: winning status was characterized by players covering more total distance (p ≤ 0.05) and low-intensity running (<14.4 km·h) (p ≤ 0.05), whereas, losing status induced more sprinting (≥25.2 km·h) (p < 0.01) and high-intensity running (≥19.8 km·h) (p ≤ 0.05). However, according to partial match status (i.e., 15 minutes and half time), players covered more distance for all running intensities while winning (p < 0.01). Technical match performance scores were not influenced by match status. In conclusion, the present study showed that the physical activities including high-intensity running and total distance covered were related to the match status, whereas technical activities were not. The overall outcome shows that higher physical activity was associated with winning partial match periods. This approach highlights the importance of physical fitness in soccer and may help coaches to better modulate players' roles and team tactical organization throughout the match.

  6. Practicality of intraoperative teamwork assessments.

    PubMed

    Phitayakorn, Roy; Minehart, Rebecca; Pian-Smith, May C M; Hemingway, Maureen W; Milosh-Zinkus, Tanya; Oriol-Morway, Danika; Petrusa, Emil

    2014-07-01

    High-quality teamwork among operating room (OR) professionals is a key to efficient and safe practice. Quantification of teamwork facilitates feedback, assessment, and improvement. Several valid and reliable instruments are available for assessing separate OR disciplines and teams. We sought to determine the most feasible approach for routine documentation of teamwork in in-situ OR simulations. We compared rater agreement, hypothetical training costs, and feasibility ratings from five clinicians and two nonclinicians with instruments for assessment of separate OR groups and teams. Five teams of anesthesia or surgery residents and OR nurses (RN) or surgical technicians were videotaped in simulations of an epigastric hernia repair where the patient develops malignant hyperthermia. Two anesthesiologists, one OR clinical RN specialist, one educational psychologist, one simulation specialist, and one general surgeon discussed and then independently completed Anesthesiologists' Non-Technical Skills, Non-Technical Skills for Surgeons, Scrub Practitioners' List of Intraoperative Non-Technical Skills, and Observational Teamwork Assessment for Surgery forms to rate nontechnical performance of anesthesiologists, surgeons, nurses, technicians, and the whole team. Intraclass correlations of agreement ranged from 0.17-0.85. Clinicians' agreements were not different from nonclinicians'. Published rater training was 4 h for Anesthesiologists' Non-Technical Skills and Scrub Practitioners' List of Intraoperative Non-Technical Skills, 2.5 h for Non-Technical Skills for Surgeons, and 15.5 h for Observational Teamwork Assessment for Surgery. Estimated costs to train one rater to use all instruments ranged from $442 for a simulation specialist to $6006 for a general surgeon. Additional training is needed to achieve higher levels of agreement; however, costs may be prohibitive. The most cost-effective model for real-time OR teamwork assessment may be to use a simulation technician combined with one clinical rater to allow complete documentation of all participants. Copyright © 2014 Elsevier Inc. All rights reserved.

  7. Quicker, slicker, and better? An evaluation of a web-based human resource management system

    NASA Astrophysics Data System (ADS)

    Gibb, Stephen; McBride, Andrew

    2001-10-01

    This paper reviews the design and development of a web based Human Resource Management (HRM) system which has as its foundation a 'capability profiler' tool for analysing individual or team roles in organisations. This provides a foundation for managing a set of integrated activities in recruitment and selection, performance and career management, and training and development for individuals, teams, and whole organisations. The challenges of representing and processing information about the human side of organisation encountered in the design and implementation of such systems are evident. There is a combination of legal, practical, technical and philosophical issues to be faced in the processes of defining roles, selecting staff, monitoring and managing the performance of employees in the design and implementation of such systems. The strengths and weaknesses of web based systems in this context are evaluated. This evaluation highlights both the potential, given the evolution of broader Enterprise Resource Planning (ERP) systems and strategies in manufacturing, and concerns about the migration of HRM processes to such systems.

  8. Triple Helix

    DTIC Science & Technology

    2008-08-01

    and sponsoring FIRST teams at the Junior FIRST Lego League (JFLL) and the FIRST Lego League (FLL) levels in elementary and middle school . As such, the...a Final Technical Report for Year I Grant W911NF-07-1-0663 with the Newport News Public School District for the Menchville High School Robotics Team...August 2008 TRIPL HELIX 0 Menchville High School Newport News, VA 20080829081 w DEFENSE TECHNICAL INFORMATION CENTER bfro do.A icfr tkw, Def&*ue, Cow

  9. Technical Assessment of the National Full Scale Aerodynamic Complex Fan Blades Repair

    NASA Technical Reports Server (NTRS)

    Young, Clarence P., Jr.; Dixon, Peter G.; St.Clair, Terry L.; Johns, William E.

    1998-01-01

    This report describes the principal activities of a technical review team formed to address National Full Scale Aerodynamic Complex (NFAC) blade repair problems. In particular, the problem of lack of good adhesive bonding of the composite overwrap to the Hyduliginum wood blade material was studied extensively. Description of action plans and technical elements of the plans are provided. Results of experiments designed to optimize the bonding process and bonding strengths obtained on a full scale blade using a two-step cure process with adhesive primers are presented. Consensus recommendations developed by the review team in conjunction with the NASA Ames Fan Blade Repair Project Team are provided along with lessons learned on this program. Implementation of recommendations resulted in achieving good adhesive bonds between the composite materials and wooden blades, thereby providing assurance that the repaired fan blades will meet or exceed operational life requirements.

  10. Streamlining Software Aspects of Certification: Technical Team Report on the First Industry Workshop

    NASA Technical Reports Server (NTRS)

    Hayhurst, Kelly J.; Holloway, C. Michael; Knight, John C.; Leveson, Nancy G.; Yang, Jeffrey C.; Dorsey, Cheryl A.; McCormick, G. Frank

    1998-01-01

    To address concerns about time and expense associated with software aspects of certification, the Federal Aviation Administration (FAA) began the Streamlining Software Aspects of Certification (SSAC) program. As part of this program, a Technical Team was established to determine whether the cost and time associated with certifying aircraft can be reduced while maintaining or improving safety, with the intent of impacting the FAA's Flight 2000 program. The Technical Team conducted a workshop to gain a better understanding of the major concerns in industry about software cost and schedule. Over 120 people attended the workshop, including representatives from the FAA,commercial transport and general aviation aircraft manufacturers and suppliers, and procurers and developers of non-airborne systems; and, more than 200 issues about software aspects of certification were recorded. This paper provides an overview of the SSAC program, motivation for the workshop, details of the workshop activities and outcomes, and recommendations for follow-on work.

  11. Youth Action Teams: An Approach to Student Involvement. Technical Assistance Bulletin 33.

    ERIC Educational Resources Information Center

    National School Resource Network, Washington, DC.

    Youth Action Teams have been implemented in over 14 sites across the country in the past few years. Such teams are made up of a diverse group of youth working together on a project through the school, a youth service organization, a community organization, or the government. The team decides its focus, and what projects its members wish to…

  12. DIY Solar Market Analysis Webinar Series: Solar Resource and Technical

    Science.gov Websites

    Series: Solar Resource and Technical Potential DIY Solar Market Analysis Webinar Series: Solar Resource and Technical Potential Wednesday, June 11, 2014 As part of a Do-It-Yourself Solar Market Analysis summer series, NREL's Solar Technical Assistance Team (STAT) presented a live webinar titled, "Solar

  13. Inequity-aversion and relative kindness intention jointly determine the expenditure of effort in project teams

    PubMed Central

    Rapoport, Amnon; Zhao, Rui

    2017-01-01

    The literature on team cooperation has neglected the effects of relative kindness intention on cooperation, which we measure by comparing the kindness intentions of an agent to her group members to the kindness shown by other members to this same agent. We argue that the agent’s emotional reaction to material payoff inequity is not constant, but rather affected by her relative kindness intention. Then, we apply the model to team projects with multiple partners and investigate how inequity-aversion and relative kindness intention jointly influence team cooperation. We first consider the case of homogeneous agents, where their marginal productivity levels and technical capacities are the same, and then consider the case of heterogeneous agents, where their marginal productivity levels and technical capacities are not the same. Our results show that inequity-aversion has no effect on effort expenditure in the former case, but does affect it in the latter case. The consideration of relative kindness intention may impact the agents’ optimal cooperative effort expenditure when their technical capacities are different. In addition, it is beneficial for team cooperation, and might not only reduce the negative impact but also enhance the positive impact of inequity-aversion on the agents’ effort expenditures. PMID:28459853

  14. Customisation of an instrument to assess anaesthesiologists' non-technical skills.

    PubMed

    Jepsen, Rikke M H G; Spanager, Lene; Lyk-Jensen, Helle T; Dieckmann, Peter; Østergaard, Doris

    2015-02-22

    The objectives of the study were to identify Danish anaesthesiologists' non-technical skills and to customise the Scottish-developed Anaesthetists' Non-Technical Skills instrument for Danish anaesthesiologists. Six semi-structured group interviews were conducted with 31 operating room team members: anaes-thesiologists, nurse anaesthetists, surgeons, and scrub nurses. Interviews were transcribed verbatim and analysed using directed content analysis. Anaesthesiologists' non-technical skills were identified, coded, and sorted using the original instrument as a basis. The resulting prototype instrument was discussed with anaesthesiologists from 17 centres to ensure face validity. Interviews lasted 46-67 minutes. Identified examples of anaesthesiologists' good or poor non-technical skills fit the four categories in the original instrument: situation awareness; decision making; team working; and task management. Anaesthesiologists' leadership role in the operating room was emphasised: the original 'Task Management' category was named 'Leadership'. One new element, 'Demonstrating self-awareness' was added under the category 'Situation Awareness'. Compared with the original instrument, half of the behavioural markers were new, which reflected that being aware of and communicating one's own abilities to the team; working systematically; and speaking up to avoid adverse events were important skills. The Anaesthetists' Non-Technical Skills instrument was customised to a Danish setting using the identified non-technical skills for anaesthesiologists and the original instrument as basis. The customised instrument comprises four categories and 16 underpinning elements supported by multiple behavioural markers. Identifying non-technical skills through semi-structured group interviews and analysing them using direct content analysis proved a useful method for customising an assessment instrument to another setting.

  15. 48 CFR 1509.507-2 - Contract clause.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... include activities related to technical analyses in determining the nature and extent of contamination at... solicitations and contracts that provide professional architect/engineer, technical, and management services to...) Alternate II shall be used in all Superfund Technical Assistance and Removal Team (START) solicitations and...

  16. Distant yet Near: Promoting Interdisciplinary Learning in Significantly Diverse Teams through Socially Responsible Projects

    ERIC Educational Resources Information Center

    Adya, Monica; Temple, Bryan K.; Hepburn, Donald M.

    2015-01-01

    With global specialization of work units within organizations, interdisciplinary work practices comprised of collaborative efforts between technical and business teams are increasingly common in today's workplace. While higher education has responded by creating opportunities for remote teams to learn from collaborative work, occasions for…

  17. Hidden Disruptions: Technology and Technological Literacy as Influences on Professional Writing Student Teams

    ERIC Educational Resources Information Center

    McGrady, Lisa

    2010-01-01

    This article reports on a study designed to explore whether and in what ways individual students' technological literacies might impact collaborative teams. For the collaborative team discussed in this article, technological literacy--specifically, limited repertoires for solving technical problems, clashes between document management strategies,…

  18. Performance Indicators Related to Points Scoring and Winning in International Rugby Sevens

    PubMed Central

    Higham, Dean G.; Hopkins, Will G.; Pyne, David B.; Anson, Judith M.

    2014-01-01

    Identification of performance indicators related to scoring points and winning is needed to inform tactical approaches to international rugby sevens competition. The aim of this study was to characterize team performance indicators in international rugby sevens and quantify their relationship with a team’s points scored and probability of winning. Performance indicators of each team during 196 matches of the 2011/2012 International Rugby Board Sevens World Series were modeled for their linear relationships with points scored and likelihood of winning within (changes in team values from match to match) and between (differences between team values averaged over all matches) teams. Relationships were evaluated as the change and difference in points and probability of winning associated with a two within- and between-team standard deviations increase in performance indicator values. Inferences about relationships were assessed using a smallest meaningful difference of one point and a 10% probability of a team changing the outcome of a close match. All indicators exhibited high within-team match-to-match variability (intraclass correlation coefficients ranged from 0.00 to 0.23). Excluding indicators representing points-scoring actions or events occurring on average less than once per match, 13 of 17 indicators had substantial clear within-team relationships with points scored and/or likelihood of victory. Relationships between teams were generally similar in magnitude but unclear. Tactics that increase points scoring and likelihood of winning should be based on greater ball possession, fewer rucks, mauls, turnovers, penalties and free kicks, and limited passing. Key points Successful international rugby sevens teams tend to maintain ball possession; more frequently avoid taking the ball into contact; concede fewer turnovers, penalties and free kicks; retain possession in scrums, rucks and mauls; and limit passing the ball. Selected performance indicators may be used to evaluate team performances and plan more effective tactical approaches to competition. There is greater match-to-match variability in performance indicator values within than between international rugby sevens teams. The priorities for a rugby sevens team’s technical and tactical preparation should reflect the magnitudes of the relationships between performance indicators, points scoring and the likelihood of winning. PMID:24790490

  19. Changing the S and MA [Safety and Mission Assurance] Paradigm

    NASA Technical Reports Server (NTRS)

    Malone, Roy W., Jr.

    2010-01-01

    Objectives: 1) Optimize S&MA organization to best facilitate Shuttle transition in 2010, successfully support Ares developmental responsibilities, and minimize the impacts of the gap between last Shuttle flight and start of Ares V Project. 2) Improve leveraging of critical skills and experience between Shuttle and Ares. 3) Split technical and supervisory functions to facilitate technical penetration. 4) Create Chief Safety and Mission Assurance Officer (CSO) stand-alone position for successfully implementation of S&MA Technical Authority. 5) Minimize disruption to customers. 6) Provide early involvement of S&MA leadership team and frequent/open communications with S&MA team members and steak-holders.

  20. Technical Advisory Team (TAT) report on the rocket sled test accident of October 9, 2008.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stofleth, Jerome H.; Dinallo, Michael Anthony; Medina, Anthony J.

    2009-01-01

    This report summarizes probable causes and contributing factors that led to a rocket motor initiating prematurely while employees were preparing instrumentation for an AIII rocket sled test at SNL/NM, resulting in a Type-B Accident. Originally prepared by the Technical Advisory Team that provided technical assistance to the NNSA's Accident Investigation Board, the report includes analyses of several proposed causes and concludes that the most probable source of power for premature initiation of the rocket motor was the independent battery contained in the HiCap recorder package. The report includes data, evidence, and proposed scenarios to substantiate the analyses.

  1. External Peer Review Team Report Underground Testing Area Subproject for Frenchman Flat, Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sam Marutzky

    2010-09-01

    An external peer review was conducted to review the groundwater models used in the corrective action investigation stage of the Underground Test Area (UGTA) subproject to forecast zones of potential contamination in 1,000 years for the Frenchman Flat area. The goal of the external peer review was to provide technical evaluation of the studies and to assist in assessing the readiness of the UGTA subproject to progress to monitoring activities for further model evaluation. The external peer review team consisted of six independent technical experts with expertise in geology, hydrogeology,'''groundwater modeling, and radiochemistry. The peer review team was tasked withmore » addressing the following questions: 1. Are the modeling approaches, assumptions, and model results for Frenchman Flat consistent with the use of modeling studies as a decision tool for resolution of environmental and regulatory requirements? 2. Do the modeling results adequately account for uncertainty in models of flow and transport in the Frenchman Flat hydrological setting? a. Are the models of sufficient scale/resolution to adequately predict contaminant transport in the Frenchman Flat setting? b. Have all key processes been included in the model? c. Are the methods used to forecast contaminant boundaries from the transport modeling studies reasonable and appropriate? d. Are the assessments of uncertainty technically sound and consistent with state-of-the-art approaches currently used in the hydrological sciences? 3. Are the datasets and modeling results adequate for a transition to Corrective Action Unit monitoring studies—the next stage in the UGTA strategy for Frenchman Flat? The peer review team is of the opinion that, with some limitations, the modeling approaches, assumptions, and model results are consistent with the use of modeling studies for resolution of environmental and regulatory requirements. The peer review team further finds that the modeling studies have accounted for uncertainty in models of flow and transport in the Frenchman Flat except for a few deficiencies described in the report. Finally, the peer review team concludes that the UGTA subproject has explored a wide range of variations in assumptions, methods, and data, and should proceed to the next stage with an emphasis on monitoring studies. The corrective action strategy, as described in the Federal Facility Agreement and Consent Order, states that the groundwater flow and transport models for each corrective action unit will consider, at a minimum, the following: • Alternative hydrostratigraphic framework models of the modeling domain. • Uncertainty in the radiological and hydrological source terms. • Alternative models of recharge. • Alternative boundary conditions and groundwater flows. • Multiple permissive sets of calibrated flow models. • Probabilistic simulations of transport using plausible sets of alternative framework and recharge models, and boundary and groundwater flows from calibrated flow models. • Ensembles of forecasts of contaminant boundaries. • Sensitivity and uncertainty analyses of model outputs. The peer review team finds that these minimum requirements have been met. While the groundwater modeling and uncertainty analyses have been quite detailed, the peer review team has identified several modeling-related issues that should be addressed in the next phase of the corrective action activities: • Evaluating and using water-level gradients from the pilot wells at the Area 5 Radioactive Waste Management Site in model calibration. • Re-evaluating the use of geochemical age-dating data to constrain model calibrations. • Developing water budgets for the alluvial and upper volcanic aquifer systems in Frenchman Flat. • Considering modeling approaches in which calculated groundwater flow directions near the water table are not predetermined by model boundary conditions and areas of recharge, all of which are very uncertain. • Evaluating local-scale variations in hydraulic conductivity on the calculated contaminant boundaries. • Evaluating the effects of non-steady-state flow conditions on calculated contaminant boundaries, including the effects of long-term declines in water levels, climatic change, and disruption of groundwater system by potential earthquake faulting along either of the two major controlling fault zones in the flow system (the Cane Spring and Rock Valley faults). • Considering the use of less-complex modeling approaches. • Evaluating the large change in water levels in the vicinity of the Frenchman Flat playa and developing a conceptual model to explain these water-level changes. • Developing a long-term groundwater level monitoring program for Frenchman Flat with regular monitoring of water levels at key monitoring wells. Despite these reservations, the peer review team strongly believes that the UGTA subproject should proceed to the next stage.« less

  2. Upper Ocean Characteristics in the Tropical Indian Ocean from AXBT and AXCTD Measurements

    DTIC Science & Technology

    2012-03-01

    processors. 30 As a last resort, we contacted the vendor of the AXCTD probes, Lockheed Martin Sippican, for data reduction support. AXCTD (.wav) files...that were unsuccessfully recovered with the previously discussed methods were provided to Lockheed Martin technical team who used the MK21 signal...data from the top subjectively. We requested both the original and the depth corrected .dta files from Lockheed Martin to evaluate their bias

  3. The Imperial Paediatric Emergency Training Toolkit (IPETT) for use in paediatric emergency training: development and evaluation of feasibility and validity.

    PubMed

    Lambden, Simon; DeMunter, Claudine; Dowson, Anne; Cooper, Mehrengise; Gautama, Sanjay; Sevdalis, Nick

    2013-06-01

    To develop and test the feasibility, reliability, and validity of a practical toolkit for the assessment and feedback of skills required to manage paediatric emergencies in critical care settings. The Imperial Paediatric Emergency Training Toolkit (IPETT) was developed based on current evidence-base and expert input. IPETT assesses both technical and non-technical skills. The technical component covers skills in the areas of clinical assessment, airway and breathing, cardiovascular, and drugs. The non-technical component is based on the validated NOTECHS tool and covers communication and interaction, cooperation and team skills, leadership and managerial skills, and decision-making. The reliability (internal consistency), content validity (inter-correlations between different skills) and concurrent validity (correlations between global technical and non-technical scores) of IPETT were prospectively evaluated in 45 simulated paediatric crises carried out in a PICU with anaesthetic and paediatric trainees (N=52). Non-parametric analyses were carried out. Significance was set at P<0.05. Cronbach alpha reliability coefficients were overall acceptable for the technical (alpha range=0.638-0.810) and good for the non-technical (alpha range=0.701-0.899) component of IPETT. The median inter-skill correlation was rho=0.564 and rho=0.549 for the technical and non-technical components, respectively. These indicate good content validity, as the skills were inter-related but not redundant. We also demonstrate a correlation between the global technical and non-technical scores (rho=0.471) - all Ps<0.05 during the assessments. IPETT offers a psychometrically viable and feasible to use tool in the context of paediatric emergencies training. This study shows that assessment of technical and non-technical skills in combination may offer a more clinically relevant model for training in paediatric emergencies. Further validation should aim to demonstrate skill retention over time and skill transfer from simulation-based training to real emergencies. Copyright © 2013. Published by Elsevier Ireland Ltd.

  4. Are the resources adoptive for conducting team-based diabetes management clinics? An explorative study at primary health care centers in Muscat, Oman.

    PubMed

    Al-Alawi, Kamila; Johansson, Helene; Al Mandhari, Ahmed; Norberg, Margareta

    2018-05-08

    AimThe aim of this study is to explore the perceptions among primary health center staff concerning competencies, values, skills and resources related to team-based diabetes management and to describe the availability of needed resources for team-based approaches. The diabetes epidemic challenges services available at primary health care centers in the Middle East. Therefore, there is a demand for evaluation of the available resources and team-based diabetes management in relation to the National Diabetes Management Guidelines. A cross-sectional study was conducted with 26 public primary health care centers in Muscat, the capital of Oman. Data were collected from manual and electronic resources as well as a questionnaire that was distributed to the physician-in-charge and diabetes management team members.FindingsThe study revealed significant differences between professional groups regarding how they perceived their own competencies, values and skills as well as available resources related to team-based diabetes management. The perceived competencies were high among all professions. The perceived team-related values and skills were also generally high but with overall lower recordings among the nurses. This pattern, along with the fact that very few nurses have specialized qualifications, is a barrier to providing team-based diabetes management. Participants indicated that there were sufficient laboratory resources; however, reported that pharmacological, technical and human resources were lacking. Further work should be done at public primary diabetes management clinics in order to fully implement team-based diabetes management.

  5. Technical assessment of high energy astronomy Observatory-B (HEAO-B) Attitude Control and and Determination Subsystem (ACDS)

    NASA Technical Reports Server (NTRS)

    1976-01-01

    The HEAO-B ACDS Review Team completed its four month assessment of the technical adequacy of the HEAO-B ACDS. As a result of its detailed analysis of the ACDS, the team found no reason why the ACDS will not perform its specified functions adequately. However, 23 concerns that point to potential difficulties were found and delineated; 18 of these are in the form of review item discrepancies.

  6. Aeroelastic Uncertainty Quantification Studies Using the S4T Wind Tunnel Model

    NASA Technical Reports Server (NTRS)

    Nikbay, Melike; Heeg, Jennifer

    2017-01-01

    This paper originates from the joint efforts of an aeroelastic study team in the Applied Vehicle Technology Panel from NATO Science and Technology Organization, with the Task Group number AVT-191, titled "Application of Sensitivity Analysis and Uncertainty Quantification to Military Vehicle Design." We present aeroelastic uncertainty quantification studies using the SemiSpan Supersonic Transport wind tunnel model at the NASA Langley Research Center. The aeroelastic study team decided treat both structural and aerodynamic input parameters as uncertain and represent them as samples drawn from statistical distributions, propagating them through aeroelastic analysis frameworks. Uncertainty quantification processes require many function evaluations to asses the impact of variations in numerous parameters on the vehicle characteristics, rapidly increasing the computational time requirement relative to that required to assess a system deterministically. The increased computational time is particularly prohibitive if high-fidelity analyses are employed. As a remedy, the Istanbul Technical University team employed an Euler solver in an aeroelastic analysis framework, and implemented reduced order modeling with Polynomial Chaos Expansion and Proper Orthogonal Decomposition to perform the uncertainty propagation. The NASA team chose to reduce the prohibitive computational time by employing linear solution processes. The NASA team also focused on determining input sample distributions.

  7. Development of a Customizable Programme for Improving Interprofessional Team Meetings: An Action Research Approach

    PubMed Central

    van Bokhoven, Marloes Amantia; Goossens, Wilhelmus Nicolaas Marie; Daniëls, Ramon; van der Weijden, Trudy; Beurskens, Anna

    2018-01-01

    Introduction: Interprofessional teamwork is increasingly necessary in primary care to meet the needs of people with complex care demands. Needs assessment shows that this requires efficient interprofessional team meetings, focusing on patients’ personal goals. The aim of this study was to develop a programme to improve the efficiency and patient-centredness of such meetings. Methods: Action research approach: a first draft of the programme was developed, and iteratively used and evaluated by three primary care teams. Data were collected using observations, interviews and a focus group, and analysed using directed content analysis. Results: The final programme comprises a framework to reflect on team functioning, and training activities supplemented by a toolbox. Training is intended for the chairperson and a co-chair, and aims at organizing and structuring meetings, and enhancing patient-centredness. Our findings emphasize the essential role of the team’s chairperson, who, in addition to technically structuring meetings, should act as a change agent guiding team development. Conclusion: Findings show that the programme should be customizable to each individual team’s context and participants’ learning objectives. Becoming acquainted with new structures can be considered a growth process, in which teams have to find their way, with the chairperson as change agent. PMID:29632457

  8. NASAwide electronic publishing system-prototype STI electronic document distribution: Stage-4 evaluation report. Part 2; Appendices

    NASA Technical Reports Server (NTRS)

    Tuey, Richard C.; Collins, Mary; Caswell, Pamela; Haynes, Bob; Nelson, Michael L.; Holm, Jeanne; Buquo, Lynn; Tingle, Annette; Cooper, Bill; Stiltner, Roy

    1996-01-01

    This evaluation report contains an introduction, seven chapters, and five appendices. The Introduction describes the purpose, conceptual framework, functional description, and technical report server of the Scientific and Technical Information (STI) Electronic Document Distribution (EDD) project. Chapter 1 documents the results of the prototype STI EDD in actual operation. Chapter 2 documents each NASA center's post processing publication processes. Chapter 3 documents each center's STI software, hardware. and communications configurations. Chapter 7 documents STI EDD policy, practices, and procedures. The appendices consist of (A) the STI EDD Project Plan, (B) Team members, (C) Phasing Schedules, (D) Accessing On-line Reports, and (E) Creating an HTML File and Setting Up an xTRS. In summary, Stage 4 of the NASAwide Electronic Publishing System is the final phase of its implementation through the prototyping and gradual integration of each NASA center's electronic printing systems, desk top publishing systems, and technical report servers, to be able to provide to NASA's engineers, researchers, scientists, and external users, the widest practicable and appropriate dissemination of information concerning its activities and the result thereof to their work stations.

  9. Safety of Rural Nursing Home-to-Emergency Department Transfers: Improving Communication and Patient Information Sharing Across Settings.

    PubMed

    Tupper, Judith B; Gray, Carolyn E; Pearson, Karen B; Coburn, Andrew F

    2015-01-01

    The "siloed" approach to healthcare delivery contributes to communication challenges and to potential patient harm when patients transfer between settings. This article reports on the evaluation of a demonstration in 10 rural communities to improve the safety of nursing facility (NF) transfers to hospital emergency departments by forming interprofessional teams of hospital, emergency medical service, and NF staff to develop and implement tools and protocols for standardizing critical interfacility communication pathways and information sharing. We worked with each of the 10 teams to document current communication processes and information sharing tools and to design, implement, and evaluate strategies/tools to increase effective communication and sharing of patient information across settings. A mixed methods approach was used to evaluate changes from baseline in documentation of patient information shared across settings during the transfer process. Study findings showed significant improvement in key areas across the three settings, including infection status and baseline mental functioning. Improvement strategies and performance varied across settings; however, accurate and consistent information sharing of advance directives and medication lists remains a challenge. Study results demonstrate that with neutral facilitation and technical support, collaborative interfacility teams can assess and effectively address communication and information sharing problems that threaten patient safety.

  10. From Crew Communication to Coordination: A Fundamental Means to an End

    NASA Technical Reports Server (NTRS)

    Kanki, Barbara G.; Connors, Mary M. (Technical Monitor)

    1998-01-01

    This viewgraph presentation describes the purposes and contexts of communication, factors which affect the interpretation of communication, and the advantages of effective, systematic communication to and from crews. Communication accomplishes information transfer, team/task management, shared problem solving and decision making, and establishment of the interpersonal climate. These accomplishments support outcomes: Technical task performance; CRM (crew resource management); Procedures and ATC (air traffic control); and Work/team atmosphere. The presentation lists various types of management inefficiency which can result from a lack of each of the four accomplishments. Communication skills are used within the following contexts: physical; social and organizational; task and operational; and speech and linguistic. Crew communication can be evaluated through investigation (case study), research (experimentation), and training.

  11. Formative evaluation of AARP's Active for Life campaign to improve walking and bicycling environments in two cities.

    PubMed

    Emery, James; Crump, Carolyn; Hawkins, Margaret

    2007-10-01

    AARP conducted a 2.5-year social-marketing campaign to improve physical activity levels among older adults in Richmond, Virginia and Madison, Wisconsin. This article presents formative evaluation findings from the campaign's policy/environmental change component. Evaluation data were abstracted from technical-assistance documentation and telephone interviews. Results include 11 policy and 14 environmental changes attained or in-process by campaign closure. Differences between the cities' results are explained through differences in program implementation (e.g., types of changes planned, formalization of partnerships). Project teams took less time deciding to pursue policy change than environmental change; however, planning the policy activities took longer than planning environmental-change activities. Recommendations for future policy/environmental change interventions focus on the selection of strategies; planning for administrative resources; formalizing partnerships to ensure sustainability of impact; ensuring training and technical assistance; and documenting progress. Similar intervention results may be attainable with a multi-year timeframe, adequate part-time coordination, and committed volunteers.

  12. Improving NASA's technology transfer process through increased screening and evaluation in the information dissemination program

    NASA Technical Reports Server (NTRS)

    Laepple, H.

    1979-01-01

    The current status of NASA's technology transfer system can be improved if the technology transfer process is better understood. This understanding will only be gained if a detailed knowledge about factors generally influencing technology transfer is developed, and particularly those factors affecting technology transfer from government R and D agencies to industry. Secondary utilization of aerospace technology is made more difficult because it depends on a transfer process which crosses established organizational lines of authority and which is outside well understood patterns of technical applications. In the absence of a sound theory about technology transfer and because of the limited capability of government agencies to explore industry's needs, a team approach to screening and evaluation of NASA generated technologies is proposed which calls for NASA, and other organizations of the private and public sectors which influence the transfer of NASA generated technology, to participate in a screening and evaluation process to determine the commercial feasibility of a wide range of technical applications.

  13. Interdisciplinary Student Teams Projects: A Case Study

    ERIC Educational Resources Information Center

    Kruck, S. E.; Teer, Faye P.

    2009-01-01

    In today's organizations team work has become an integral part of the day-to-day routine. For this reason, University professors are including group projects in many courses. In such group assessments, we advocate the use of interdisciplinary teams, where possible. As a case study, we report an interdisciplinary group technical project with…

  14. 7 CFR Appendix D to Subpart B of... - Technical Report for Flexible Fuel Pumps

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... flexible fuel pump projects, as defined in § 4280.103. (a) Qualifications of project team. The flexible fuel pump project team is expected to consist of a project manager, an equipment supplier of major... may serve more than one role. Authoritative evidence that project team service providers have the...

  15. 7 CFR Appendix D to Subpart B of... - Technical Report for Flexible Fuel Pumps

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... flexible fuel pump projects, as defined in § 4280.103. (a) Qualifications of project team. The flexible fuel pump project team is expected to consist of a project manager, an equipment supplier of major... may serve more than one role. Authoritative evidence that project team service providers have the...

  16. 7 CFR Appendix D to Subpart B of... - Technical Report for Flexible Fuel Pumps

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... flexible fuel pump projects, as defined in § 4280.103. (a) Qualifications of project team. The flexible fuel pump project team is expected to consist of a project manager, an equipment supplier of major... may serve more than one role. Authoritative evidence that project team service providers have the...

  17. A Mirror for Managers: Using Simulation to Develop Management Teams. Technical Report 23.

    ERIC Educational Resources Information Center

    Kaplan, Robert E.; And Others

    Although simulation is among the least common of the many methods consultants employ to stimulate team development, realistic simulation can help in the diagnosis of management teams. Simulations fill a gap in the repertoire of data collection methods for organizational diagnosis and development by affording an opportunity for direct observation…

  18. Interprofessional education and social interaction: The use of automated external defibrillators in team-based basic life support.

    PubMed

    Onan, Arif; Simsek, Nurettin

    2017-04-01

    Automated external defibrillators are pervasive computing devices designed for the treatment and management of acute sudden cardiac arrest. This study aims to explain users' actual use behavior in teams formed by different professions taken after a short time span of interaction with automated external defibrillator. Before the intervention, all the participants were certified with the American Heart Association Basic Life Support for healthcare providers. A statistically significant difference was revealed in mean individual automated external defibrillator technical skills between uniprofessional and interprofessional groups. The technical automated external defibrillator team scores were greater for groups with interprofessional than for those with uniprofessional education. The nontechnical automated external defibrillator skills of interprofessional and uniprofessional teams revealed differences in advantage of interprofessional teams. Students positively accept automated external defibrillators if well-defined and validated training opportunities to use them expertly are available. Uniprofessional teams were successfully supported by their members and, thereby, used automated external defibrillator effectively. Furthermore, the interprofessional approach resulted in as much effective teamwork as the uniprofessional approach.

  19. NASA's Gravitational-Wave Mission Concept Study

    NASA Technical Reports Server (NTRS)

    Stebbins, Robin

    2012-01-01

    With the conclusion of the NASA/ESA partnership on the Laser interferometer Space Antenna (LISA) Project, NASA initiated a study to explore mission concepts that will accomplish some or all of the LISA science objectives at lower cost. The Gravitational-Wave Mission Concept Study consists of a public Request for Information (RFI), a Core Team of NASA engineers and scientists, a Community Science Team, a Science Task Force, and an open workshop. The RFI yielded 12 mission concepts, 3 instrument concepts and 2 technologies. The responses ranged from concepts that eliminated the drag-free test mass of LISA to concepts that replace the test mass with an atom interferometer. The Core Team reviewed the noise budgets and sensitivity curves, the payload and spacecraft designs and requirements, orbits and trajectories and technical readiness and risk. The Science Task Force assessed the science performance. Three mission concepts have been studied by Team-X, JPL's concurrent design facility, to refine the conceptual design, evaluate key performance parameters, assess risk and estimate cost and schedule. The status of the Study are reported.

  20. Experiences of multidisciplinary development team members during user-centered design of telecare products and services: a qualitative study.

    PubMed

    Vermeulen, Joan; Verwey, Renée; Hochstenbach, Laura M J; van der Weegen, Sanne; Man, Yan Ping; de Witte, Luc P

    2014-05-19

    User-centered design (UCD) methodologies can help take the needs and requirements of potential end-users into account during the development of innovative telecare products and services. Understanding how members of multidisciplinary development teams experience the UCD process might help to gain insight into factors that members with different backgrounds consider critical during the development of telecare products and services. The primary objective of this study was to explore how members of multidisciplinary development teams experienced the UCD process of telecare products and services. The secondary objective was to identify differences and similarities in the barriers and facilitators they experienced. Twenty-five members of multidisciplinary development teams of four Research and Development (R&D) projects participated in this study. The R&D projects aimed to develop telecare products and services that can support self-management in elderly people or patients with chronic conditions. Seven participants were representatives of end-users (elderly persons or patients with chronic conditions), three were professional end-users (geriatrician and nurses), five were engineers, four were managers (of R&D companies or engineering teams), and six were researchers. All participants were interviewed by a researcher who was not part of their own development team. The following topics were discussed during the interviews: (1) aim of the project, (2) role of the participant, (3) experiences during the development process, (4) points of improvement, and (5) what the project meant to the participant. Experiences of participants related to the following themes: (1) creating a development team, (2) expectations regarding responsibilities and roles, (3) translating user requirements into technical requirements, (4) technical challenges, (5) evaluation of developed products and services, and (6) valorization. Multidisciplinary team members from different backgrounds often reported similar experienced barriers (eg, different members of the development team speak a "different language") and facilitators (eg, team members should voice expectations at the start of the project to prevent miscommunication at a later stage). However, some experienced barriers and facilitators were reported only by certain groups of participants. For example, only managers reported the experience that having different ideas about what a good business case is within one development team was a barrier, whereas only end-users emphasized the facilitating role of project management in end-user participation and the importance of continuous feedback from researchers on input of end-users. Many similarities seem to exist between the experienced barriers and facilitators of members of multidisciplinary development teams during UCD of telecare products and services. However, differences in experiences between team members from various backgrounds exist as well. Insights into these similarities and differences can improve understanding between team members from different backgrounds, which can optimize collaboration during the development of telecare products and services.

  1. Aligning Career and Technical Education

    ERIC Educational Resources Information Center

    Workman, Ed; Stubbs, Joyce

    2011-01-01

    The issues and concerns facing Kentucky Career and Technical Teacher Education (KY CTTE), university teacher educators and state department Career and Technical Education (CTE) leaders in providing and preparing the best CTE teachers possible are not unique to Kentucky. In an effort to better understand these issues and concerns a team of state…

  2. Validity evidence of non-technical skills assessment instruments in simulated anaesthesia crisis management.

    PubMed

    Jirativanont, T; Raksamani, K; Aroonpruksakul, N; Apidechakul, P; Suraseranivongse, S

    2017-07-01

    We sought to evaluate the validity of two non-technical skills evaluation instruments, the Anaesthetists' Non-Technical Skills (ANTS) behavioural marker system and the Ottawa Global Rating Scale (GRS), to apply them to anaesthesia training. The content validity, response process, internal structure, relations with other variables and consequences were described for validity evidence. Simulated crisis management sessions were initiated during which two trained raters evaluated the performance of postgraduate first-, second- and third-year (PGY-1, PGY-2 and PGY-3) anaesthesia residents. The study included 70 participants, composed of 24 PGY-1, 24 PGY-2 and 22 PGY-3 residents. Both instruments differentiated the non-technical skills of PGY-1 from PGY-3 residents ( P <0.05). Inter-rater agreement was measured using the intraclass correlation coefficient (ICC). For the ANTS instrument, the intraclass correlation coefficients for task management, team-working, situation awareness and decision-making were 0.79, 0.34, 0.81 and 0.70, respectively. For the Ottawa GRS, the intraclass correlation coefficients for overall performance, leadership, problem-solving, situation awareness, resource utilisation and communication skills were 0.86, 0.83, 0.84, 0.87, 0.80 and 0.86, respectively. The Cronbach's alpha for internal consistency of the ANTS instrument was 0.93, and was 0.96 for the Ottawa GRS. There was a high correlation between the ANTS and Ottawa GRS. The raters reported the ease of use of the Ottawa GRS compared to the ANTS. We found sufficient evidence of validity in the ANTS instrument and the Ottawa GRS for the evaluation of non-technical skills in a simulated anaesthesia setting, but the Ottawa GRS was more practical and had higher reliability.

  3. Timber sale planning and analysis system: A user`s guide to the TSPAS sale program. Forest Service general technical report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schuster, E.G.; Jones, J.G.; Meacham, M.L.

    1995-08-01

    Presents a guide to operation and interpretation of TSPAS Sale Program (TSPAS SP), a menu-driven computer program that is one of two programs in the Timber Sale Planning and Analysis System. TSPAS SP is intended to help field teams design and evaluate timber sale alternatives. TSPAS SP evaluate current and long-term timber implications along with associated nontimber outputs. Features include multiple entries and products, real value change, and graphical input. Guide includes user instructions, a glossary, a listing of data needs, and an explanation of error messages.

  4. Reducing Amputations in People with Diabetes (RAPID): Evaluation of a New Care Pathway

    PubMed Central

    MacRury, Sandra; Main, Fiona; Gorman, Jane; Jones, Sandra; Macfarlane, David

    2018-01-01

    People with diabetes are at increased risk of foot ulcers, which, if left untreated, can lead to infection, gangrene, and subsequent amputation. Management by a multidisciplinary diabetes foot team has been shown to reduce amputation rates; however, accessing specialist treatment is made particularly difficult when living in remote and rural locations, such as many individuals cared for within NHS Highland. The RAPID project was made up of two phases: firstly, to evaluate the technical feasibility of a new integrated care pathway using innovative technology, and secondly, to establish process enhancement of the pathway to justify a larger-scale study. Omni-HubTM enabled a face-to-face consultation by the community podiatrist to be enhanced by virtual consultation with members of the multidisciplinary foot team, including specialist diabetes podiatrists and a diabetes consultant. The technical feasibility study provided recommended changes focused around adaptations to the equipment used and the best means to gain successful connectivity. The process enhancement study demonstrated positive outcomes in the process with positive effects both in the service received by patients and experiences of healthcare professionals involved. The RAPID project provides evidence and justification for a larger-scale empirical study to test an embedded pathway and technology solution, which will inform policy change and a paradigm shift in the management of foot ulceration in the community. PMID:29772673

  5. Reducing Amputations in People with Diabetes (RAPID): Evaluation of a New Care Pathway.

    PubMed

    MacRury, Sandra; Stephen, Kate; Main, Fiona; Gorman, Jane; Jones, Sandra; Macfarlane, David

    2018-05-16

    People with diabetes are at increased risk of foot ulcers, which, if left untreated, can lead to infection, gangrene, and subsequent amputation. Management by a multidisciplinary diabetes foot team has been shown to reduce amputation rates; however, accessing specialist treatment is made particularly difficult when living in remote and rural locations, such as many individuals cared for within NHS Highland. The RAPID project was made up of two phases: firstly, to evaluate the technical feasibility of a new integrated care pathway using innovative technology, and secondly, to establish process enhancement of the pathway to justify a larger-scale study. Omni-Hub TM enabled a face-to-face consultation by the community podiatrist to be enhanced by virtual consultation with members of the multidisciplinary foot team, including specialist diabetes podiatrists and a diabetes consultant. The technical feasibility study provided recommended changes focused around adaptations to the equipment used and the best means to gain successful connectivity. The process enhancement study demonstrated positive outcomes in the process with positive effects both in the service received by patients and experiences of healthcare professionals involved. The RAPID project provides evidence and justification for a larger-scale empirical study to test an embedded pathway and technology solution, which will inform policy change and a paradigm shift in the management of foot ulceration in the community.

  6. Deep Space Habitat Team: HEFT Phase 2 Effects

    NASA Technical Reports Server (NTRS)

    Toups, Larry D.; Smitherman, David; Shyface, Hilary; Simon, Matt; Bobkill, Marianne; Komar, D. R.; Guirgis, Peggy; Bagdigian, Bob; Spexarth, Gary

    2011-01-01

    HEFT was a NASA-wide team that performed analyses of architectures for human exploration beyond LEO, evaluating technical, programmatic, and budgetary issues to support decisions at the highest level of the agency in HSF planning. HEFT Phase I (April - September, 2010) and Phase II (September - December, 2010) examined a broad set of Human Exploration of Near Earth Objects (NEOs) Design Reference Missions (DRMs), evaluating such factors as elements, performance, technologies, schedule, and cost. At end of HEFT Phase 1, an architecture concept known as DRM 4a represented the best available option for a full capability NEO mission. Within DRM4a, the habitation system was provided by Deep Space Habitat (DSH), Multi-Mission Space Exploration Vehicle (MMSEV), and Crew Transfer Vehicle (CTV) pressurized elements. HEFT Phase 2 extended DRM4a, resulting in DRM4b. Scrubbed element-level functionality assumptions and mission Concepts of Operations. Habitation Team developed more detailed concepts of the DSH and the DSH/MMSEV/CTV Conops, including functionality and accommodations, mass & volume estimates, technology requirements, and DDT&E costs. DRM 5 represented an effort to reduce cost by scaling back on technologies and eliminating the need for the development of an MMSEV.

  7. Assessing team performance in the operating room: development and use of a "black-box" recorder and other tools for the intraoperative environment.

    PubMed

    Guerlain, Stephanie; Adams, Reid B; Turrentine, F Beth; Shin, Thomas; Guo, Hui; Collins, Stephen R; Calland, J Forrest

    2005-01-01

    The objective of this research was to develop a digital system to archive the complete operative environment along with the assessment tools for analysis of this data, allowing prospective studies of operative performance, intraoperative errors, team performance, and communication. Ability to study this environment will yield new insights, allowing design of systems to avoid preventable errors that contribute to perioperative complications. A multitrack, synchronized, digital audio-visual recording system (RATE tool) was developed to monitor intraoperative performance, including software to synchronize data and allow assignment of independent observational scores. Cases were scored for technical performance, participants' situational awareness (knowledge of critical information), and their comfort and satisfaction with the conduct of the procedure. Laparoscopic cholecystectomy (n = 10) was studied. Technical performance of the RATE tool was excellent. The RATE tool allowed real time, multitrack data collection of all aspects of the operative environment, while permitting digital recording of the objective assessment data in a time synchronized and annotated fashion during the procedure. The mean technical performance score was 73% +/- 28% of maximum (perfect) performance. Situational awareness varied widely among team members, with the attending surgeon typically the only team member having comprehensive knowledge of critical case information. The RATE tool allows prospective analysis of performance measures such as technical judgments, team performance, and communication patterns, offers the opportunity to conduct prospective intraoperative studies of human performance, and allows for postoperative discussion, review, and teaching. This study also suggests that gaps in situational awareness might be an underappreciated source of operative adverse events. Future uses of this system will aid teaching, failure or adverse event analysis, and intervention research.

  8. Transformational leadership, initiating structure, and substitutes for leadership: a longitudinal study of research and development project team performance.

    PubMed

    Keller, Robert T

    2006-01-01

    Transformational leadership, initiating structure, and selected substitutes for leadership were studied as longitudinal predictors of performance in 118 research and development (R&D) project teams from 5 firms. As hypothesized, transformational leadership predicted 1-year-later technical quality, schedule performance, and cost performance and 5-year-later profitability and speed to market. Initiating structure predicted all the performance measures. The substitutes of subordinate ability and an intrinsically satisfying task each predicted technical quality and profitability, and ability predicted speed to market. Moderator effects for type of R&D work were hypothesized and found whereby transformational leadership was a stronger predictor of technical quality in research projects, whereas initiating structure was a stronger predictor of technical quality in development projects. Implications for leadership theory and research are discussed. (c) 2006 APA, all rights reserved.

  9. The Technical Efficiency of Earthquake Medical Rapid Response Teams Following Disasters: The Case of the 2010 Yushu Earthquake in China.

    PubMed

    Liu, Xu; Tang, Bihan; Yang, Hongyang; Liu, Yuan; Xue, Chen; Zhang, Lulu

    2015-12-04

    Performance assessments of earthquake medical rapid response teams (EMRRTs), particularly the first responders deployed to the hardest hit areas following major earthquakes, should consider efficient and effective use of resources. This study assesses the daily technical efficiency of EMRRTs in the emergency period immediately following the 2010 Yushu earthquake in China. Data on EMRRTs were obtained from official daily reports of the general headquarters for Yushu earthquake relief, the emergency office of the National Ministry of Health, and the Health Department of Qinghai Province, for a sample of data on 15 EMRRTs over 62 days. Data envelopment analysis was used to examine the technical efficiency in a constant returns to scale model, a variable returns to scale model, and the scale efficiency of EMRRTs. Tobit regression was applied to analyze the effects of corresponding influencing factors. The average technical efficiency scores under constant returns to scale, variable returns to scale, and the scale efficiency scores of the 62 units of analysis were 77.95%, 89.00%, and 87.47%, respectively. The staff-to-bed ratio was significantly related to global technical efficiency. The date of rescue was significantly related to pure technical efficiency. The type of institution to which an EMRRT belonged and the staff-to-bed ratio were significantly related to scale efficiency. This study provides evidence that supports improvements to EMRRT efficiency and serves as a reference for earthquake emergency medical rapid assistance leaders and teams.

  10. The Vehicle Integrated Performance Analysis Experience: Reconnecting With Technical Integration

    NASA Technical Reports Server (NTRS)

    McGhee, D. S.

    2006-01-01

    Very early in the Space Launch Initiative program, a small team of engineers at MSFC proposed a process for performing system-level assessments of a launch vehicle. Aimed primarily at providing insight and making NASA a smart buyer, the Vehicle Integrated Performance Analysis (VIPA) team was created. The difference between the VIPA effort and previous integration attempts is that VIPA a process using experienced people from various disciplines, which focuses them on a technically integrated assessment. The foundations of VIPA s process are described. The VIPA team also recognized the need to target early detailed analysis toward identifying significant systems issues. This process is driven by the T-model for technical integration. VIPA s approach to performing system-level technical integration is discussed in detail. The VIPA process significantly enhances the development and monitoring of realizable project requirements. VIPA s assessment validates the concept s stated performance, identifies significant issues either with the concept or the requirements, and then reintegrates these issues to determine impacts. This process is discussed along with a description of how it may be integrated into a program s insight and review process. The VIPA process has gained favor with both engineering and project organizations for being responsive and insightful

  11. Intelligent Virtual Assistant's Impact on Technical Proficiency within Virtual Teams

    ERIC Educational Resources Information Center

    Graham, Christian; Jones, Nory B.

    2016-01-01

    Information-systems development continues to be a difficult process, particularly for virtual teams that do not have the luxury of meeting face-to-face. The research literature on this topic reinforces this point: the greater part of database systems development projects ends in failure. The use of virtual teams to complete projects further…

  12. McKenzie River Subbasin Assessment, Technical Report 2000.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Alsea Geospatial, Inc.

    2000-02-01

    This document details the findings of the McKenzie River Subbasin Assessment team. The goal of the subbasin assessment is to provide an ecological assessment of the McKenzie River Floodplain, identification of conservation and restoration opportunities, and discussion of the influence of some upstream actions and processes. This Technical Report can be viewed in conjunction with the McKenzie River Subbasin Summary or as a stand-alone document. The purpose of the technical report is to detail the methodology and findings of the consulting team that the observations and recommendations in the summary document are based on. This part, Part I, provides anmore » introduction to the subbasin and a general overview. Part II details the specific findings of the science team. Part III provides an explanation and examples of how to use the data that has been developed through this assessment to aid in prioritizing restoration activities. Part III also includes the literature cited and appendices.« less

  13. The relationship between intraoperative teamwork and management skills in patient care.

    PubMed

    Phitayakorn, Roy; Minehart, Rebecca D; Hemingway, Maureen W; Pian-Smith, May C M; Petrusa, Emil

    2015-11-01

    Optimal team performance in the operating room (OR) requires a combination of interactions among OR professionals and adherence to clinical guidelines. Theoretically, it is possible that OR teams could communicate very well but fail to follow acceptable standards of patient care and vice versa. OR simulations offer an ideal research environment to study this relationship. The goal of this study was to determine the relationship between ratings of OR teamwork and communication with adherence to patient care guidelines in a simulated scenarios of malignant hyperthermia (MH). An interprofessional research team (2 anesthesiologists, 1 surgeon, an OR nurse, and a social scientist) reviewed videos of 5 intraoperative teams managing a simulated patient who manifested MH while undergoing general anesthesia for an epigastric herniorraphy in a high-fidelity, in situ OR. Participant teams consisted of 2 residents from anesthesiology, 1 from surgery, 1 OR nurse, and 1 certified surgical technician. Teamwork and communication were assessed with 4 published tools: Anesthesiologists' Non-Technical Skills (ANTS), Scrub Practitioners List of Intra-operative Non-Technical Skills (SPLINTS), Non-Technical Skills for Surgeons (NOTSS), and Objective Teamwork Assessment System (OTAS). We developed an evidence-based MH checklist to assess overall patient care. Interrater agreement for teamwork tools was moderate. Average rater agreement was 0.51 For ANTS, 0.67 for SPLINTS, 0.51 for NOTSS, and 0.70 for OTAS. Observer agreement for the MH checklist was high (0.88). Correlations between teamwork and MH checklist were not significant. Teams were different in percent of the MH actions taken (range, 50-91%; P = .006). In this pilot study, intraoperative teamwork and communication were not related to overall patient care management. Separating nontechnical and technical skills when teaching OR teamwork is artificial and may even be damaging, because such an approach could produce teams with excellent communication skills as they unsuccessfully manage the patient. OR simulations offer a unique opportunity to research how to best integrate both of these domains to improve patient care. Copyright © 2015 Elsevier Inc. All rights reserved.

  14. The Study of Crew Coordination and Performance in Hierarchical Team Decision Making

    DTIC Science & Technology

    1992-11-01

    Technical Report 92-01 3 decision making (Carley, 1991; Levis, 1984; Miao , Luh, Kleinman, & Castanon, 1991). This type of approach uses mathematical 5...Boston: Allyn and Bacon. Bieth, B. H . (1987). Subjective workload under individual and team performance conditions. Proceedings of the Human Factors...B. B., Jr. (1992, June). H •ri•oiLal_ and vertical structures in small teams: Team performance and communication Datteins. Paper presented at the 1991

  15. Game Analysis of Olympic, World and European Championships in Men's Handball.

    PubMed

    Bilge, Murat

    2012-12-01

    The development of men's handball was analyzed using data from the Olympic, World and European Championships held within the last eight years. The most obvious change, especially within these last nine tournaments, was that men's handball was played more dynamically and rapidly, both in attack and defense, especially by European teams. The first aim of this study was to conduct a technical analysis of current handball and to determine factors related to success in this sport discipline. The second aim was to compare the data of European Championships with other tournaments, considering the success of European teams in Men's World Handball. The technical variables used to compare the tournaments included: the average number of attacks, the efficiency of attacks, the efficiency of goal throws, fast break goals per game, the efficiency of fast breaks, the efficiency of the goalkeeper, saves by the goalkeeper per game, number of turnovers per game, and the efficiency of position throws (wing, pivot, back court, break-through, fast break, and 7-meter). This technical analysis used cumulative statistics from the European Handball Federation and International Handball Federation. ANOVA revealed significant differences between the first eight teams in the European Championships and their counterparts in the other two tournaments (Olympics and World Championships) in terms of several technical variables. The results showed that the efficiency of fast break, pivot position and back court players affected the ranking in favor of the European teams in significant international tournaments.

  16. SolSmart Launches to Support Local Governments | State, Local, and Tribal

    Science.gov Websites

    Local Governments May 04, 2016 by Erin Nobler As a member of the Solar Technical Assistance Team (STAT ) network, the National Renewable Energy Laboratory (NREL) provides direct technical assistance to state and no-cost technical assistance. Business processes or administrative costs, the so-called "soft

  17. Collaborating for Success: Team Teaching the Engineering Technical Thesis

    ERIC Educational Resources Information Center

    Keating, Terrence; Long, Mike

    2012-01-01

    This paper will examine the collaborative teaching process undertaken at College of the North Atlantic-Qatar (CNA-Q) by Engineering and the Communication faculties to improve the overall quality of engineering students' capstone projects known as the Technical Thesis. The Technical Thesis is divided into two separate components: a proposal stage…

  18. Enhancing Non-Technical Skills by a Multidisciplinary Engineering Summer School

    ERIC Educational Resources Information Center

    Larsen, Peter Gorm; Kristiansen, Erik Lasse; Bennedsen, Jens; Bjerge, Kim

    2017-01-01

    In general engineering studies focus on the technical skills in their own discipline. However, in their subsequent industrial careers, a significant portion of their time needs to be devoted to non-technical skills. In addition, in an increasingly globalised world collaboration in teams across cultures and disciplines is paramount to the creation…

  19. A formative evaluation of a coach-based technical assistance model for youth- and family-focused programming.

    PubMed

    Olson, Jonathan R; McCarthy, Kimberly J; Perkins, Daniel F; Borden, Lynne M

    2018-04-01

    The Children, Youth, and Families At-Risk (CYFAR) initiative provides funding and technical support for local community-based programs designed to promote positive outcomes among vulnerable populations. In 2013, CYFAR implemented significant changes in the way it provides technical assistance (TA) to grantees. These changes included introducing a new TA model in which trained coaches provide proactive support that is tailored to individual CYFAR projects. The purpose of this paper is to describe the evolution of this TA model and present preliminary findings from a formative evaluation. CYFAR Principal Investigators (PIs) were invited to respond to online surveys in 2015 and 2016. The surveys were designed to assess PI attitudes towards the nature and quality of support that they receive from their coaches. CYFAR PIs reported that their coaches have incorporated a range of coaching skills and techniques into their work. PIs have generally positive attitudes towards their coaches, and these attitudes have become more positive over time. Results suggest that CYFAR PIs have been generally supportive of the new TA system. Factors that may have facilitated support include a strong emphasis on team-building and the provision of specific resources that support program design, implementation, and evaluation. Copyright © 2017 Elsevier Ltd. All rights reserved.

  20. Current concepts in simulation-based trauma education.

    PubMed

    Cherry, Robert A; Ali, Jameel

    2008-11-01

    The use of simulation-based technology in trauma education has focused on providing a safe and effective alternative to the more traditional methods that are used to teach technical skills and critical concepts in trauma resuscitation. Trauma team training using simulation-based technology is also being used to develop skills in leadership, team-information sharing, communication, and decision-making. The integration of simulators into medical student curriculum, residency training, and continuing medical education has been strongly recommended by the American College of Surgeons as an innovative means of enhancing patient safety, reducing medical errors, and performing a systematic evaluation of various competencies. Advanced human patient simulators are increasingly being used in trauma as an evaluation tool to assess clinical performance and to teach and reinforce essential knowledge, skills, and abilities. A number of specialty simulators in trauma and critical care have also been designed to meet these educational objectives. Ongoing educational research is still needed to validate long-term retention of knowledge and skills, provide reliable methods to evaluate teaching effectiveness and performance, and to demonstrate improvement in patient safety and overall quality of care.

  1. Team Problem Solving Strategies with a Survey of These Methods Used by Faculty Members in Engineering Technology

    ERIC Educational Resources Information Center

    Marcus, Michael L.; Winters, Dixie L.

    2004-01-01

    Students from science, engineering, and technology programs should be able to work together as members of project teams to find solutions to technical problems. The exercise in this paper describes the methods actually used by a project team from a Biomedical Instrumentation Corporation in which scientists, technicians, and engineers from various…

  2. DORA-II Technical Adequacy Brief: Measuring the Process and Outcomes of Team Problem Solving

    ERIC Educational Resources Information Center

    Algozzine, Bob; Horner, Robert H.; Todd, Anne W.; Newton, J. Stephen; Algozzine, Kate; Cusumano, Dale

    2014-01-01

    School teams regularly meet to review academic and social problems of individual students, groups of students, or their school in general. While the need for problem solving and recommendations for how to do it are widely documented, there is very limited evidence reflecting the extent to which teams effectively engage in a systematic or effective…

  3. DOE Office of Scientific and Technical Information (OSTI.GOV)

    This fact provides information on the Strategic Technical Assistance Response Team (START) Program, a U.S. Department of Energy Office of Indian Energy Policy and Programs (DOE-IE) initiative to provide technical expertise to support the development of next-generation energy projects in Indian Country.

  4. Non-technical skills of surgeons and anaesthetists in simulated operating theatre crises.

    PubMed

    Doumouras, A G; Hamidi, M; Lung, K; Tarola, C L; Tsao, M W; Scott, J W; Smink, D S; Yule, S

    2017-07-01

    Deficiencies in non-technical skills (NTS) have been increasingly implicated in avoidable operating theatre errors. Accordingly, this study sought to characterize the impact of surgeon and anaesthetist non-technical skills on time to crisis resolution in a simulated operating theatre. Non-technical skills were assessed during 26 simulated crises (haemorrhage and airway emergency) performed by surgical teams. Teams consisted of surgeons, anaesthetists and nurses. Behaviour was assessed by four trained raters using the Non-Technical Skills for Surgeons (NOTSS) and Anaesthetists' Non-Technical Skills (ANTS) rating scales before and during the crisis phase of each scenario. The primary endpoint was time to crisis resolution; secondary endpoints included NTS scores before and during the crisis. A cross-classified linear mixed-effects model was used for the final analysis. Thirteen different surgical teams were assessed. Higher NTS ratings resulted in significantly faster crisis resolution. For anaesthetists, every 1-point increase in ANTS score was associated with a decrease of 53·50 (95 per cent c.i. 31·13 to 75·87) s in time to crisis resolution (P < 0·001). Similarly, for surgeons, every 1-point increase in NOTSS score was associated with a decrease of 64·81 (26·01 to 103·60) s in time to crisis resolution in the haemorrhage scenario (P = 0·001); however, this did not apply to the difficult airway scenario. Non-technical skills scores were lower during the crisis phase of the scenarios than those measured before the crisis for both surgeons and anaesthetists. A higher level of NTS of surgeons and anaesthetists led to quicker crisis resolution in a simulated operating theatre environment. © 2017 BJS Society Ltd Published by John Wiley & Sons Ltd.

  5. STP 4-06 Model-Based Technical Data in Procurement, 3D PDF Technology Data Demonstration Project. Phase 1 Summary

    DTIC Science & Technology

    2015-07-01

    O R G STP 4-06 MODEL-BASED TECHNICAL DATA IN PROCUREMENT 3D PDF TECHNOLOGY DATA DEMONSTRATION PROJECT PHASE 1 SUMMARY REPORT DL309T2...LMI’s ISO- certified quality management procedures. J U L Y 2 0 1 5 STP 4-06 MODEL-BASED TECHNICAL DATA IN PROCUREMENT 3D PDF TECHNICAL DATA...Based Technical Data ..................................................................................... 5 3D PDF Demonstration Team

  6. Stennis group receives NESC award

    NASA Image and Video Library

    2009-04-14

    The NASA Engineering & Safety Center recently presented its Group Achievement Award to a Stennis team in recognition of technical excellence in evaluating the operational anomalies and reliability improvements associated with the space shuttle engine cut-off system. Stennis employees receiving the award were: (standing, l to r) Freddie Douglas (NASA), George Drouant (Jacobs Technology Inc.), Fred Abell (Jacobs), Robert Drackett (Jacobs) and Mike Smiles (NASA); (seated, l to r): Binh Nguyen (Jacobs), Stennis Director Gene Goldman and Joseph Lacker (NASA). Phillip Hebert of NASA is not pictured.

  7. ARRA FEMP Technical Assistance -- Federal Aviation Administration Project 209 -- Control Tower and Support Building, Palm Springs, CA

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Arends, J.; Sandusky, William F.

    2010-03-31

    This report represents findings of a design review team that evaluated construction documents (at the 100% level) and operating specifications for a new control tower and support building that will be built in Palm Springs, California by the Federal Aviation Administration (FAA). The focus of the review was to identify measures that could be incorporated into the final design and operating specifications that would result in additional energy savings for the FAA that would not have otherwise occurred.

  8. Light Weight Diving System (LWDS) Prototype Technical Evaluation - Human Factors, Transportability and Suitability

    DTIC Science & Technology

    1988-08-01

    of the equipment, but NCSC may have non-obstructive life cycle instrumentation attached. NEDU will provide a suitable vehicle to transport the LWDS...CF b. Diving Supervisor - QMCS( MDV ) T.R. Griggs, USN c. Project Medical Department Representative - LCDR M. T. Wallick, MSC, USNU d. Duty Medical...NEDU using a vehicle . Notes on transportability will be made. Per the program of ANNEX A, NCSC will instruct the NEDU team in the operation of the LWDS

  9. Stennis group receives NESC award

    NASA Technical Reports Server (NTRS)

    2009-01-01

    The NASA Engineering & Safety Center recently presented its Group Achievement Award to a Stennis team in recognition of technical excellence in evaluating the operational anomalies and reliability improvements associated with the space shuttle engine cut-off system. Stennis employees receiving the award were: (standing, l to r) Freddie Douglas (NASA), George Drouant (Jacobs Technology Inc.), Fred Abell (Jacobs), Robert Drackett (Jacobs) and Mike Smiles (NASA); (seated, l to r): Binh Nguyen (Jacobs), Stennis Director Gene Goldman and Joseph Lacker (NASA). Phillip Hebert of NASA is not pictured.

  10. District heating and cooling systems for communities through power plant retrofit and distribution network, city of Piqua, Ohio

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1979-01-01

    The feasibility analysis and evaluation of the Piqua, Ohio District Heating and Cooling Demonstration program is being conducted by the Piqua Municipal Power Co., the Piqua Law Dept., the Public Works Dept., a firm of economic analysts, and the Georgia Tech Engineering Dept. This volume contains information on the organization and composition of the demonstration team; characterization of the Piqua community; and the technical, environmental, institutional; financial, and economic assessments of the project. (LCL)

  11. Video registration of trauma team performance in the emergency department: the results of a 2-year analysis in a Level 1 trauma center.

    PubMed

    Lubbert, Pieter H W; Kaasschieter, Edgar G; Hoorntje, Lidewij E; Leenen, Loek P H

    2009-12-01

    Trauma teams responsible for the first response to patients with multiple injuries upon arrival in a hospital consist of medical specialists or resident physicians. We hypothesized that 24-hour video registration in the trauma room would allow for precise evaluation of team functioning and deviations from Advanced Trauma Life Support (ATLS) protocols. We analyzed all video registrations of trauma patients who visited the emergency room of a Level I trauma center in the Netherlands between September 1, 2000, and September 1, 2002. Analysis was performed with a score list based on ATLS protocols. From a total of 1,256 trauma room presentations, we found a total of 387 video registrations suitable for analysis. The majority of patients had an injury severity score lower than 17 (264 patients), whereas 123 patients were classified as multiple injuries (injury severity score >or=17). Errors in team organization (omission of prehospital report, no evident leadership, unorganized resuscitation, not working according to protocol, and no continued supervision of the patient) lead to significantly more deviations in the treatment than when team organization was uncomplicated. Video registration of diagnostic and therapeutic procedures by a multidisciplinary trauma team facilitates an accurate analysis of possible deviations from protocol. In addition to identifying technical errors, the role of the team leader can clearly be analyzed and related to team actions. Registration strongly depends on availability of video tapes, timely started registration, and hardware functioning. The results from this study were used to develop a training program for trauma teams in our hospital that specifically focuses on the team leader's functioning.

  12. Creating an Environmental Justice Framework for Policy Change in Childhood Asthma: A Grassroots to Treetops Approach

    PubMed Central

    Sargent, Katherine; Arons, Abigail; Standish, Marion; Brindis, Claire D.

    2011-01-01

    Objectives. The Community Action to Fight Asthma Initiative, a network of coalitions and technical assistance providers in California, employed an environmental justice approach to reduce risk factors for asthma in school-aged children. Policy advocacy focused on housing, schools, and outdoor air quality. Technical assistance partners from environmental science, policy advocacy, asthma prevention, and media assisted in advocacy. An evaluation team assessed progress and outcomes. Methods. A theory of change and corresponding logic model were used to document coalition development and successes. Site visits, surveys, policymaker interviews, and participation in meetings documented the processes and outcomes. Quantitative and qualitative data were analyzed to assess strategies, successes, and challenges. Results. Coalitions, working with community residents and technical assistance experts, successfully advocated for policies to reduce children's exposures to environmental triggers, particularly in low-income communities and communities of color. Policies were implemented at various levels. Conclusions. Environmental justice approaches to policy advocacy could be an effective strategy to address inequities across communities. Strong technical assistance, close community involvement, and multilevel strategies were all essential to effective policies to reduce environmental inequities. PMID:21836108

  13. The Reconstruction and Failure Analysis of the Space Shuttle Columbia

    NASA Technical Reports Server (NTRS)

    Russell, Richard; Mayeaux, Brian; McDanels, Steven; Piascik, Robert; Sjaj. Samdee[; Jerman, Greg; Collins, Thomas; Woodworth, Warren

    2009-01-01

    Several days following the Columbia accident a team formed and began planning for the reconstruction of Columbia. A hangar at the Kennedy Space Center was selected for this effort due to it's size, available technical workforce and materials science laboratories and access to the vehicle ground processing infrastructure. The Reconstruction team established processes for receiving, handling, decontamination, tracking, identifying, cleaning and assessment of the debris. Initially, a 2-dimensional reconstruction of the Orbiter outer mold line was developed. As the investigation progressed fixtures which allowed a 3-dimensional reconstruction of the forward portions of the left wing's leading edge was developed. To support the reconstructions and forensic analyses a Materials and Processes (M&P) 'team was formed. This M&P team established processes for recording factual observations, debris cleaning, and engineering analysis. Fracture surfaces and thermal effects of selected airframe debris were assessed, and process flows for both nondestructive and destructive sampling and evaluation of debris were developed. The Team also assessed left hand airframe components that were believed to be associated with a structural breach of Columbia. A major portion of this analysis was evaluation of metallic deposits were prevalent on left wing leading edge components. Extensive evaluation of the visual, metallurgical and chemical nature of the deposits provided conclusions that were consistent with the visual assessments and interpretations of the NASA lead teams and the findings of the Columbia Accident Investigation Board. Analytical data collected by the M&P Team showed that a significant thermal event occurred at the left wing leading edge in the proximity of LH RCC Panels 8-9, and a correlation was formed between the deposits and overheating in these areas to the wing leading edge components. The analysis of deposits also showed exposure to temperatures in excess of 1649 C (3200 F), which would severely degrade support structure, tiles, and RCC panel materials. The integrated failure analysis of wing leading edge debris and deposits strongly supported the hypothesis that a breach occurred at LH RCC Panel 8.

  14. Experiences of Multidisciplinary Development Team Members During User-Centered Design of Telecare Products and Services: A Qualitative Study

    PubMed Central

    2014-01-01

    Background User-centered design (UCD) methodologies can help take the needs and requirements of potential end-users into account during the development of innovative telecare products and services. Understanding how members of multidisciplinary development teams experience the UCD process might help to gain insight into factors that members with different backgrounds consider critical during the development of telecare products and services. Objective The primary objective of this study was to explore how members of multidisciplinary development teams experienced the UCD process of telecare products and services. The secondary objective was to identify differences and similarities in the barriers and facilitators they experienced. Methods Twenty-five members of multidisciplinary development teams of four Research and Development (R&D) projects participated in this study. The R&D projects aimed to develop telecare products and services that can support self-management in elderly people or patients with chronic conditions. Seven participants were representatives of end-users (elderly persons or patients with chronic conditions), three were professional end-users (geriatrician and nurses), five were engineers, four were managers (of R&D companies or engineering teams), and six were researchers. All participants were interviewed by a researcher who was not part of their own development team. The following topics were discussed during the interviews: (1) aim of the project, (2) role of the participant, (3) experiences during the development process, (4) points of improvement, and (5) what the project meant to the participant. Results Experiences of participants related to the following themes: (1) creating a development team, (2) expectations regarding responsibilities and roles, (3) translating user requirements into technical requirements, (4) technical challenges, (5) evaluation of developed products and services, and (6) valorization. Multidisciplinary team members from different backgrounds often reported similar experienced barriers (eg, different members of the development team speak a “different language”) and facilitators (eg, team members should voice expectations at the start of the project to prevent miscommunication at a later stage). However, some experienced barriers and facilitators were reported only by certain groups of participants. For example, only managers reported the experience that having different ideas about what a good business case is within one development team was a barrier, whereas only end-users emphasized the facilitating role of project management in end-user participation and the importance of continuous feedback from researchers on input of end-users. Conclusions Many similarities seem to exist between the experienced barriers and facilitators of members of multidisciplinary development teams during UCD of telecare products and services. However, differences in experiences between team members from various backgrounds exist as well. Insights into these similarities and differences can improve understanding between team members from different backgrounds, which can optimize collaboration during the development of telecare products and services. PMID:24840245

  15. Credit Quandaries: How Career and Technical Education Teachers Can Teach Courses That Include Academic Credit. Ask the Team

    ERIC Educational Resources Information Center

    Jacques, Catherine

    2014-01-01

    Many career and technical education (CTE) courses not only provide students with vocational and technical skills and knowledge, but engage them in academic content as well. Designed thoughtfully, these courses can address rigorous academic content standards and be as intellectually demanding as traditional academic courses (Southern Regional…

  16. TECHNICAL RESOURCE DOCUMENT ON MONITORED NATURAL RECOVERY

    EPA Science Inventory

    In 2005, the United States Environmental Protection Agency (EPA) published a document entitled Contaminated Sediment Remediation Guidance for Hazardous Waste Sites (EPA, 2005), which provides technical and policy guidance for project managers and teams making risk manageme...

  17. DOE Office of Scientific and Technical Information (OSTI.GOV)

    This fact sheet provides information on the Tribes selected to receive assistance from the U.S. Department of Energy Office of Indian Energy 2013 Strategic Technical Assistance Response Team (START) Program, which provides technical expertise to support the development of next-generation energy projects on tribal lands.

  18. 78 FR 48424 - 36(b)(1) Arms Sales Notification

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-08

    ... Notification AGENCY: Defense Security Cooperation Agency, Department of Defense ACTION: Notice. SUMMARY: The..., personnel training and training equipment, site surveys, Quality Assurance Teams, U.S. Government and... Teams, U.S. Government and contractor technical assistance, and other related elements of program and...

  19. Tasks completed by nursing members of a teaching hospital Medical Emergency Team.

    PubMed

    Topple, Michelle; Ryan, Brooke; Baldwin, Ian; McKay, Richard; Blythe, Damien; Rogan, John; Radford, Sam; Jones, Daryl

    2016-02-01

    To assess tasks completed by intensive care medical emergency team nurses. Prospective observational study. Australian teaching hospital. Nursing-related technical and non-technical tasks and level of self-reported confidence and competence. Amongst 400 calls, triggers and nursing tasks were captured in 93.5% and 77.3% of cases, respectively. The median patient age was 73 years. The four most common triggers were hypotension (22.0%), tachycardia (21.1%), low SpO2 (17.4%), and altered conscious state (10.1%). Non-technical skills included investigation review (33.7%), history acquisition (18.4%), contribution to the management plan (40.5%) and explanation to bedside nurses (78.3%), doctors (13.6%), allied health (3.9%) or patient/relative (39.5%). Technical tasks included examining the circulation (32%), conscious state (29.4%), and chest (26.5%). Additional tasks included adjusting oxygen (23.9%), humidification (8.4%), non-invasive ventilation (6.5%), performing an ECG (22%), and administrating fluid as a bolus (17.5%) or maintenance (16, 5.2%), or medication as a statim dose (16.8%) or infusion (5.2%). Self-reported competence and confidence appeared to be high overall amongst our MET nurses. Our findings provide important information on the tasks completed by Medical Emergency Team nurses and will guide future training. Copyright © 2015 Elsevier Ltd. All rights reserved.

  20. Devising a consensus definition and framework for non-technical skills in healthcare to support educational design: A modified Delphi study.

    PubMed

    Gordon, Morris; Baker, Paul; Catchpole, Ken; Darbyshire, Daniel; Schocken, Dawn

    2015-01-01

    Non-technical skills are a subset of human factors that focus on the individual and promote safety through teamwork and awareness. There is no widely adopted competency- or outcome-based framework for non-technical skills training in healthcare. The authors set out to devise such a framework using a modified Delphi approach. An exhaustive list of published and team suggested items was presented to the expert panel for ranking and to propose a definition. In the second round, a focused list was presented, as well as the proposed definition elements. The finalised framework was sent to the panel for review. Sixteen experts participated. The final framework consists of 16 competencies for all and eight specific competencies for team leaders. The consensus definition describes non-technical skills as "a set of social (communication and team work) and cognitive (analytical and personal behaviour) skills that support high quality, safe, effective and efficient inter-professional care within the complex healthcare system". The authors have produced a new competency framework, through the works of an International expert panel, which is not discipline specific that can be used by curriculum developers, educational innovators and clinical teachers to support developments in the field.

  1. Breaking new ground for remote sensing in support of disaster relief efforts: Detecting and pinpointing earthquake damage in near real-time (El Salvador, January 2001)

    NASA Astrophysics Data System (ADS)

    Nezry, Edmond; Romeijn, Paul P.; Sarti, Francesco; Inglada, Jordi; Zagolski, Francis; Yakam-Simen, Francis

    2002-01-01

    On January 13th 2001, a very strong earthquake struck El-Salvador, causing almost 1000 deaths and huge destruction, leaving more than one million people homeless. As support to the rescue teams, a project was initiated to provide up-to date maps and to identify damages to housing and infrastructures, covering the whole country. Based on the analysis of SPOT Panchromatic satellite imagery, updated maps were delivered to the rescue teams within 72 hours after the earthquake. In addition, during the 10 days following the earthquake, high resolution mapping of the damages was carried out in cooperation and coordination with rescue teams and relief organizations. Some areas of particular interest were even processed and damage maps delivered through the Internet, three hours after the request. For the first time in the history of spaceborne Earth observation, identification and evaluation of the damages were delivered on-site, in real-time (during the interventions), to local authorities, rescue teams and humanitarian organizations. In this operation, operating 24 hours a day and technical ability were the keys for success and contributed to saving lives.

  2. Simulation-based training delivered directly to the pediatric cardiac intensive care unit engenders preparedness, comfort, and decreased anxiety among multidisciplinary resuscitation teams.

    PubMed

    Allan, Catherine K; Thiagarajan, Ravi R; Beke, Dorothy; Imprescia, Annette; Kappus, Liana J; Garden, Alexander; Hayes, Gavin; Laussen, Peter C; Bacha, Emile; Weinstock, Peter H

    2010-09-01

    Resuscitation of pediatric cardiac patients involves unique and complex physiology, requiring multidisciplinary collaboration and teamwork. To optimize team performance, we created a multidisciplinary Crisis Resource Management training course that addressed both teamwork and technical skill needs for the pediatric cardiac intensive care unit. We sought to determine whether participation improved caregiver comfort and confidence levels regarding future resuscitation events. We developed a simulation-based, in situ Crisis Resource Management curriculum using pediatric cardiac intensive care unit scenarios and unit-specific resuscitation equipment, including an extracorporeal membrane oxygenation circuit. Participants replicated the composition of a clinical team. Extensive video-based debriefing followed each scenario, focusing on teamwork principles and technical resuscitation skills. Pre- and postparticipation questionnaires were used to determine the effects on participants' comfort and confidence regarding participation in future resuscitations. A total of 182 providers (127 nurses, 50 physicians, 2 respiratory therapists, 3 nurse practitioners) participated in the course. All participants scored the usefulness of the program and scenarios as 4 of 5 or higher (5 = most useful). There was significant improvement in participants' perceived ability to function as a code team member and confidence in a code (P < .001). Participants reported they were significantly more likely to raise concerns about inappropriate management to the code leader (P < .001). We developed a Crisis Resource Management training program in a pediatric cardiac intensive care unit to teach technical resuscitation skills and improve team function. Participants found the experience useful and reported improved ability to function in a code. Further work is needed to determine whether participation in the Crisis Resource Management program objectively improves team function during real resuscitations. 2010 The American Association for Thoracic Surgery. Published by Mosby, Inc. All rights reserved.

  3. Personality and community prevention teams: Dimensions of team leader and member personality predicting team functioning.

    PubMed

    Feinberg, Mark E; Kim, Ji-Yeon; Greenberg, Mark T

    2008-11-01

    The predictors and correlates of positive functioning among community prevention teams have been examined in a number of research studies; however, the role of personality has been neglected. In this study, we examined whether team member and leader personality dimensions assessed at the time of team formation predicted local prevention team functioning 2.5-3.5 years later. Participants were 159 prevention team members in 14 communities participating in the PROSPER study of prevention program dissemination. Three aspects of personality, aggregated at the team level, were examined as predictors: Openness to Experience, Conscientiousness, and Agreeableness. A series of multivariate regression analyses were performed that accounted for the interdependency of five categories of team functioning. Results showed that average team member Openness was negatively, and Conscientiousness was positively linked to team functioning. The findings have implications for decisions about the level and nature of technical assistance support provided to community prevention teams.

  4. 77 FR 40026 - 36(b)(1) Arms Sales Notification

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-06

    ... and contractor logistics, Quality Assurance Team support services, engineering and technical support..., engineering and technical support, and other related elements of program support. The estimated cost is $49..., maintenance, or training is Confidential. Reverse engineering could reveal Confidential information...

  5. Lessons Learned in Over a Decade of Technical Support for U.S. Nuclear Cyber Security Programmes

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Glantz, Clifford S.; Landine, Guy P.; Craig, Philip A.

    Pacific Northwest National Laboratory’s (PNNL) nuclear cyber security team has been providing technical support to the U.S. Nuclear Regulatory Commission (NRC) since 2002. This team has provided cyber security technical experties in conducting cyber security inspections, developing of regulatory rules and guidance, reviewing facility cyber security plans, developing inspection guidance, and developing and teaching NRC inspectors how to conduct cyber security assessments. The extensive experience the PNNL team has gathered has allowed them to compile a lenghty list of recommendations on how to improve cyber security programs and conduct assessments. A selected set of recommendations are presented, including the needmore » to: integrate an array of defenisve strategies into a facility’s cyber security program, coordinate physical and cyber security activities, train phycial security forces to resist a cyber-enabled physical attack, improve estimates of the consequences of a cyber attack, properly resource cyber security assessments, appropropriately account for insider threats, routinely monitor security devices for potential attacks, supplement compliance-based requirements with risk-based decision making, and introduce the concept of resilience into cyber security programs.« less

  6. Interprofessional non-technical skills for surgeons in disaster response: a qualitative study of the Australian perspective.

    PubMed

    Willems, Anneliese; Waxman, Buce; Bacon, Andrew K; Smith, Julian; Peller, Jennifer; Kitto, Simon

    2013-03-01

    Interprofessional non-technical skills for surgeons in disaster response have not yet been developed. The aims of this study were to identify the non-technical skills required of surgeons in disaster response and training for disaster response and to explore the barriers and facilitators to interprofessional practice in surgical teams responding to disasters. Twenty health professionals, with prior experience in natural disaster response or education, participated in semi-structured in-depth interviews. A qualitative matrix analysis design was used to thematically analyze the data. Non-technical skills for surgeons in disaster response identified in this study included skills for austere environments, cognitive strategies and interprofessional skills. Skills for austere environments were physical self-care including survival skills, psychological self-care, flexibility, adaptability, innovation and improvisation. Cognitive strategies identified in this study were "big picture" thinking, situational awareness, critical thinking, problem solving and creativity. Interprofessional attributes include communication, team-player, sense of humor, cultural competency and conflict resolution skills. "Interprofessionalism" in disaster teams also emerged as a key factor in this study and incorporated elements of effective teamwork, clear leadership, role adjustment and conflict resolution. The majority of participants held the belief that surgeons needed training in non-technical skills in order to achieve best practice in disaster response. Surgeons considerring becoming involved in disaster management should be trained in these skills, and these skills should be incorporated into disaster preparation courses with an interprofessional focus.

  7. Participatory Programming of a Campus Child Development Facility.

    ERIC Educational Resources Information Center

    Sanoff, Henry; Sanoff, Joan

    The process of designing Wake Technical College's campus child development center involved a team of college administrators, early childhood program staff, and an architectural consultant. The design process included a needs assessment, an interest survey, center visitations, team formation, goal refinement and clarification in brainstorming…

  8. Integrating Safety and Mission Assurance into Systems Engineering Modeling Practices

    NASA Technical Reports Server (NTRS)

    Beckman, Sean; Darpel, Scott

    2015-01-01

    During the early development of products, flight, or experimental hardware, emphasis is often given to the identification of technical requirements, utilizing such tools as use case and activity diagrams. Designers and project teams focus on understanding physical and performance demands and challenges. It is typically only later, during the evaluation of preliminary designs that a first pass, if performed, is made to determine the process, safety, and mission quality assurance requirements. Evaluation early in the life cycle, though, can yield requirements that force a fundamental change in design. This paper discusses an alternate paradigm for using the concepts of use case or activity diagrams to identify safety hazard and mission quality assurance risks and concerns using the same systems engineering modeling tools being used to identify technical requirements. It contains two examples of how this process might be used in the development of a space flight experiment, and the design of a Human Powered Pizza Delivery Vehicle, along with the potential benefits to decrease development time, and provide stronger budget estimates.

  9. Iso standardization of theoretical activity evaluation method for low and intermediate level activated waste generated at nuclear power plants

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Makoto Kashiwagi; Garamszeghy, Mike; Lantes, Bertrand

    Disposal of low-and intermediate-level activated waste generated at nuclear power plants is being planned or carried out in many countries. The radioactivity concentrations and/or total quantities of long-lived, difficult-to-measure nuclides (DTM nuclides), such as C-14, Ni-63, Nb-94, α emitting nuclides etc., are often restricted by the safety case for a final repository as determined by each country's safety regulations, and these concentrations or amounts are required to be known and declared. With respect to waste contaminated by contact with process water, the Scaling Factor method (SF method), which is empirically based on sampling and analysis data, has been applied asmore » an important method for determining concentrations of DTM nuclides. This method was standardized by the International Organization for Standardization (ISO) and published in 2007 as ISO21238 'Scaling factor method to determine the radioactivity of low and intermediate-level radioactive waste packages generated at nuclear power plants' [1]. However, for activated metal waste with comparatively high concentrations of radioactivity, such as may be found in reactor control rods and internal structures, direct sampling and radiochemical analysis methods to evaluate the DTM nuclides are limited by access to the material and potentially high personnel radiation exposure. In this case, theoretical calculation methods in combination with empirical methods based on remote radiation surveys need to be used to best advantage for determining the disposal inventory of DTM nuclides while minimizing exposure to radiation workers. Pursuant to this objective a standard for the theoretical evaluation of the radioactivity concentration of DTM nuclides in activated waste, is in process through ISO TC85/SC5 (ISO Technical Committee 85: Nuclear energy, nuclear technologies, and radiological protection; Subcommittee 5: Nuclear fuel cycle). The project team for this ISO standard was formed in 2011 and is composed of experts from 11 countries. The project team has been conducting technical discussions on theoretical methods for determining concentrations of radioactivity, and has developed the draft International Standard of ISO16966 'Theoretical activation calculation method to evaluate the radioactivity of activated waste generated at nuclear reactors' [2]. This paper describes the international standardization process developed by the ISO project team, and outlines the following two theoretical activity evaluation methods:? Point method? Range method. (authors)« less

  10. Design for effective development and prototyping of the HL-20

    NASA Astrophysics Data System (ADS)

    Urie, David M.; Floreck, Paul A.; McMorris, John A.; Elvin, John D.

    1993-10-01

    A feasibility study of the HL-20 personnel launch system (PLS) concept was conducted by a team which focused on creating a PLS design approach and an accelerated development plan consistent with the historical 'Skunk Works' approach to rapid prototyping. Technical design, manufacturing, system testing, and operations and support elements of the predefined baseline concept were evaluated. An initial phase program, featuring a concurrent system test during design and development, leading to the orbital flight of an unmanned HL-20 prototype on a Titan III launch system, was prescribed. A second-phase development and manufacturing plan leading to system operational status was also formulated. Baseline design feature modifications were made when necessary, without compromise to performance, to satisfy the prototype development plan. Technical design details and off-the-shelf hardware candidates were also identified for several subsystems, including the launch-system interface adapter/emergency escape system. The technical feasibility of the system and applicability of the Skunk Works approach to development of the HL-20/PLS were verified.

  11. An approach to developing independent learning and non-technical skills amongst final year mining engineering students

    NASA Astrophysics Data System (ADS)

    Knobbs, C. G.; Grayson, D. J.

    2012-06-01

    There is mounting evidence to show that engineers need more than technical skills to succeed in industry. This paper describes a curriculum innovation in which so-called 'soft' skills, specifically inter-personal and intra-personal skills, were integrated into a final year mining engineering course. The instructional approach was designed to promote independent learning and to develop non-technical skills, essential for students on the threshold of becoming practising engineers. Three psychometric tests were administered at the beginning of the course to make students aware of their own and their classmates' characteristics. Substantial prescribed reading assignments preceded weekly group discussions. Several projects during the course required team work skills and application of content knowledge to real-world contexts. Results obtained from students' reflection papers, assignments related to 'soft' skills and end of course evaluations suggest that students' appreciation of the need for these skills, as well as their own perceived competence, increased during the course. Their ability to function as independent learners also increased.

  12. Engineering Technical Support Center Annual Report Fiscal ...

    EPA Pesticide Factsheets

    The United States Environmental Protection Agency (EPA or Agency) Office of Research and Development (ORD) created the Engineering Technical Support Center (ETSC) in 1987, one of several technical support centers created as part of the Technical Support Project (TSP). ETSC provides engineering expertise to Agency program and regional offices and remediation teams working at contaminated sites across the country. The ETSC is operated within ORD’s Land Remediation and Pollution Control Division (LRPCD) of the National Risk Management Research Laboratory (NRMRL) in Cincinnati, Ohio. The ETSC’s mission is to provide site-specific scientific and engineering technical support to Remedial Project Managers, On-Scene Coordinators, and other remediation personnel at contaminated sites. This allows local, regional, or national authorities to work more quickly, efficiently, and cost effectively, while also increasing the technical experience of the remediation team. Since its inception, the ETSC has supported countless projects across all EPA Regions in almost all states and territories. This report highlights significant projects the ETSC supported in fiscal year 2015 (FY15). These projects addressed an array of environmental scenarios, such as remote mining contamination, expansive landfill waste, cumulative impacts from multiple contamination sources, and persistent threats from abandoned industrial sites. Constructing and testing new and innovative treatment technol

  13. Roles and Responsibilities in Feature Teams

    NASA Astrophysics Data System (ADS)

    Eckstein, Jutta

    Agile development requires self-organizing teams. The set-up of a (feature) team has to enable self-organization. Special care has to be taken if the project is not only distributed, but also large and more than one feature team is involved. Every feature team needs in such a setting a product owner who ensures the continuous focus on business delivery. The product owners collaborate by working together in a virtual team. Each feature team is supported by a coach who ensures not only the agile process of the individual feature team but also across all feature teams. An architect (or if necessary a team of architects) takes care that the system is technically sound. Contrariwise to small co-located projects, large global projects require a project manager who deals with—among other things—internal and especially external politics.

  14. Application of a design-build-team approach to low cost and weight composite fuselage structure

    NASA Technical Reports Server (NTRS)

    Ilcewicz, L. B.; Walker, T. H.; Willden, K. S.; Swanson, G. D.; Truslove, G.; Metschan, S. L.; Pfahl, C. L.

    1991-01-01

    Relationships between manufacturing costs and design details must be understood to promote the application of advanced composite technologies to transport fuselage structures. A team approach, integrating the disciplines responsible for aircraft structural design and manufacturing, was developed to perform cost and weight trade studies for a twenty-foot diameter aft fuselage section. Baseline composite design and manufacturing concepts were selected for large quadrant panels in crown, side, and keel areas of the fuselage section. The associated technical issues were also identified. Detailed evaluation of crown panels indicated the potential for large weight savings and costs competitive with aluminum technology in the 1995 timeframe. Different processes and material forms were selected for the various elements that comprise the fuselage structure. Additional cost and weight savings potential was estimated for future advancements.

  15. Improved Management of the Technical Interfaces Between the Hanford Tank Farm Operator and the Hanford Waste Treatment Plant - 13383

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Duncan, Garth M.; Saunders, Scott A.

    2013-07-01

    The Department of Energy (DOE) is constructing the Waste Treatment and Immobilization Plant (WTP) at the Hanford site in Washington to treat and immobilize approximately 114 million gallons of high level radioactive waste (after all retrievals are accomplished). In order for the WTP to be designed and operated successfully, close coordination between the WTP engineering, procurement, and construction contractor, Bechtel National, Inc. and the tank farms operating contractor (TOC), Washington River Protection Solutions, LLC, is necessary. To develop optimal solutions for DOE and for the treatment of the waste, it is important to deal with the fact that two differentmore » prime contractors, with somewhat differing contracts, are tasked with retrieving and delivering the waste and for treating and immobilizing that waste. The WTP and the TOC have over the years cooperated to manage the technical interface. To manage what is becoming a much more complicated interface as the WTP design progresses and new technical issues have been identified, an organizational change was made by WTP and TOC in November of 2011. This organizational change created a co-located integrated project team (IPT) to deal with mutual and interface issues. The Technical Organization within the One System IPT includes employees from both TOC and WTP. This team has worked on a variety of technical issues of mutual interest and concern. Technical issues currently being addressed include: - The waste acceptance criteria; - Waste feed delivery and the associated data quality objectives (DQO); - Evaluation of the effects of performing a riser cut on a single shell tank on WTP operations; - The disposition of secondary waste from both TOC and WTP; - The close coordination of the TOC double shell tank mixing and sampling program and the Large Scale Integrated Test (LSIT) program for pulse jet mixers at WTP along with the associated responses to the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 2010-2; - Development of a set of alternatives to the current baseline that involve aspects of direct feed, feed conditioning, and design changes. The One System Technical Organization has served WTP, TOC, and DOE well in managing and resolving issues at the interface. This paper describes the organizational structure used to improve the interface and several examples of technical interface issues that have been successfully addressed by the new organization. (authors)« less

  16. Setting up an energy management team

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mashburn, W.H.

    1995-12-31

    Many people that are assigned the responsibility of reducing energy costs within an organization are technically inclined, and may have little organizational or management skills. A number of companies have achieved great savings with just a technical energy manager acting in a prima donna role. However, so much more can be achieved if energy management is integrated throughout the whole organization, with input from all levels. The energy management team is the key to an organized approach, and establishing one is the place to start. The Industrial Energy Center at Virginia Tech is sponsored by both electric and natural gasmore » utilities who ask for assistance in conducting energy surveys of industrial firms. One requirement of the companies the author surveys is that they agree to establish an energy management team. During the first few hours with the company he helps organize and train the team. The objective is to have a high implementation rate of the energy conservation opportunities found during the survey. By leaving in place an in-house energy management team, the prospects for this are better. The author has found that most large corporations have some type of energy management program, but not much has transcended to company level. This paper is directed toward establishing an energy management team at company level.« less

  17. Heterogeneous Teams of Autonomous Vehicles: Advanced Sensing & Control

    DTIC Science & Technology

    2009-03-01

    Final Technical 3. DATES COVERED (From To) 7/1/05-12/31708 4. TITLE AND SUBTITLE Heterogeneous Teams of Autonomous Vehicles Advanced Sensing...assimilating data from underwater and surface autonomous vehicles in addition to the usual sources of Eulerian and Lagrangian systems into a small scale

  18. An Architecture for Learning in Projects?

    ERIC Educational Resources Information Center

    Sense, Andrew J.

    2004-01-01

    This paper reports upon a two-year, qualitative, case study action research investigation into "learning within a project team". This project team undertook a significant socio-technical redesign project within a major Australian heavy engineering/manufacturing operation. The paper identifies and elaborates upon a number of elements that…

  19. 15 CFR 716.4 - Scope and conduct of inspections.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... is the responsibility of the Host Team Leader. (3) ITAR-controlled technology. ITAR-controlled technology shall not be divulged to the Inspection Team without U.S. Government authorization (such technology includes, but is not limited to technical data related to Schedule 1 chemicals or Schedule 2...

  20. Evaluation of the state water-resources research institutes

    USGS Publications Warehouse

    Ertel, M.O.

    1988-01-01

    Water resources research institutes, as authorized by the Water Resources Research Act of 1984 (Public Law 98-242), are located in each state and in the District of Columbia, Guam, Puerto Rico , and the Virgin Islands. Public Law 98-242 mandated an onsite evaluation of each of these institutes to determine whether ' . . .the quality and relevance of its water resources research and its effectiveness as an institution for planning, conducting, and arranging for research warrant its continued support in the national interest. ' The results of these evaluations, which were conducted between September 1985 and June 1987, are summarized. The evaluation teams found that all 54 institutes are meeting the basic objectives of the authorizing legislation in that they: (1) use the grant funds to support research that addresses water problems of state and regional concern; (2) provide opportunities for training of water scientists through student involvement on research projects; and (3) promote the application of research results through preparation of technical reports and contributions to the technical literature. The differences among institutes relate primarily to degrees of effectiveness, and most often are determined by the financial, political, and geographical contexts in which the institutes function and by the quality of their leadership. (Lantz-PTT)

  1. Eleven Tribes Jump START Clean Energy Projects, Summer 2012 (Newsletter)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This newsletter describes key activities of the DOE Office of Indian Energy Policy and Programs for Summer 2012. The U.S. Department of Energy Office of Indian Energy Policy and Programs (DOE-IE) has selected 11 Tribes - five in Alaska and six in the contiguous United States - to receive on-the-ground technical support for community-based energy efficiency and renewable energy projects as part of DOE-IE's Strategic Technical Assistance Response Team (START) Program. START finalists were selected based on the clarity of their requests for technical assistance and the ability of START to successfully work with their projects or community. Technical expertsmore » from DOE and its National Renewable Energy Laboratory (NREL) will work directly with community-based project teams to analyze local energy issues and assist the Tribes in moving their projects forward. In Alaska, the effort will be bolstered by DOE-IE's partnership with the Denali Commission, which will provide additional assistance and expertise, as well as funding to fuel the Alaska START initiative.« less

  2. Modeling and Quantification of Team Performance in Human Reliability Analysis for Probabilistic Risk Assessment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jeffrey C. JOe; Ronald L. Boring

    Probabilistic Risk Assessment (PRA) and Human Reliability Assessment (HRA) are important technical contributors to the United States (U.S.) Nuclear Regulatory Commission’s (NRC) risk-informed and performance based approach to regulating U.S. commercial nuclear activities. Furthermore, all currently operating commercial NPPs in the U.S. are required by federal regulation to be staffed with crews of operators. Yet, aspects of team performance are underspecified in most HRA methods that are widely used in the nuclear industry. There are a variety of "emergent" team cognition and teamwork errors (e.g., communication errors) that are 1) distinct from individual human errors, and 2) important to understandmore » from a PRA perspective. The lack of robust models or quantification of team performance is an issue that affects the accuracy and validity of HRA methods and models, leading to significant uncertainty in estimating HEPs. This paper describes research that has the objective to model and quantify team dynamics and teamwork within NPP control room crews for risk informed applications, thereby improving the technical basis of HRA, which improves the risk-informed approach the NRC uses to regulate the U.S. commercial nuclear industry.« less

  3. Impact of clinical leadership in teams' course on quality, efficiency, responsiveness and trust in the emergency department: study protocol of a trailing research study.

    PubMed

    Husebø, Sissel Eikeland; Olsen, Øystein Evjen

    2016-08-10

    Clinical leadership has long been recognised as critical for optimising patient safety, quality of care and interprofessional teamwork in busy and stressful healthcare settings. There is a need to compensate for the absence of the conventional mentor-to-apprentice transfer of clinical leadership knowledge and skills. While young doctors and nurses are increasingly proficient in medical, surgical and technical skills, their training in, and knowledge of clinical leadership skills, is not adequate to meet the demands for these non-technical skills in the emergency department. Thus, the purpose of the paper is to present and discuss the study protocol of clinical leadership in a course for teams that aims to improve quality, efficiency, responsiveness of healthcare services and collegial trust in the emergency department. The study employs a trailing research design using multiple quantitative and qualitative methods in the summative (pretest and post-test) and formative evaluation. Quantitative data have been collected from a patient questionnaire, the emergency departments' database and by the observation of team performance. Qualitative data have been collected by shadowing healthcare professionals and through focus group interviews. To ensure trustworthiness in the data analysis, we will apply member checks and analyst triangulation, in addition to providing contextual and sample description to allow for evaluation of transferability of our results to other contexts and groups. The study is approved by the ethics committee of the western part of Norway and the hospital. The study is based on voluntary participation and informed written consent. Informants can withdraw at any point in time. The results will be disseminated at research conferences, peer review journals and through public presentations to people outside the scientific community. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/

  4. Reframing beliefs about work and change processes in redesigning laboratory services.

    PubMed

    Kelly, D L

    1998-03-01

    In 1996 a team started meeting to redesign care at Intermountain Health Care's (Salt Lake City) laboratory services on a fast track to dovetail with remodeling of the physical layout. The team reframed its current beliefs about using team processes--including use of a consultant/facilitator, team size, and decision making (by criteria instead of consensus). Although the lab was strong in technical measurements, the sole management measurement before redesign was financial data generated by the accounting department. A comprehensive measurement system, which was required for the lab to evaluate the impact of the redesign efforts and manage its operations over time, constituted the team's first steps toward implementing the redesign effort. PROCESS REDESIGN: Once the team understood the purpose, customer expectations, desired outcomes of the specimen flow process, and the reasons for current breakdowns, it was able to design an ideal high-level process (with a floor plan to support it). Multiple subprocesses were redesigned and implemented on the basis of reframed beliefs--for example, that the process starts and ends with the customer (clinician or patient) and that there is one standardized entry point into the lab to reduce variability in processing and assign priority for analysis of specimens. For example, the team identified opportunities for improvements in the manner in which laboratory test results were communicated to physicians' offices. The belief that appeared to have the most profound impact on the redesign effort was the clarification of the fundamental purpose of laboratory services and how it shapes every aspect of the business.

  5. Life Sciences Centrifuge Facility review

    NASA Technical Reports Server (NTRS)

    Young, Laurence R.

    1994-01-01

    The Centrifuge Facility Project at ARC was reviewed by a code U team to determine appropriateness adequacy for the ISSA. This report represents the findings of one consultant to this team and concentrates on scientific and technical risks. This report supports continuation of the project to the next phase of development.

  6. 78 FR 24730 - New England Fishery Management Council (NEFMC); Public Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-26

    ... the exclusive economic zone (EEZ). Recommendations from this group will be brought to the full Council... additional information provided to it by the Council's Monkfish Plan Development Team. The Committee also will review the approach used by the Council's Groundfish Closed Area Technical Team to spatially...

  7. Intermediaries Supporting Sports-Based Youth Development Programs

    ERIC Educational Resources Information Center

    Wicks, Anne; Beedy, Jeffrey P.; Spangler, Kathy J.; Perkins, Daniel F.

    2007-01-01

    The authors describe intermediary organizations whose aim is to provide technical assistance to sports organizations about infusing a youth development emphasis into their programming. Team-Up for Youth, Sports PLUS Global, and the National Recreation and Park Association are the three organizations highlighted in this article. Team-Up for Youth's…

  8. 15 CFR 270.205 - Reports.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 15 Commerce and Foreign Trade 1 2013-01-01 2013-01-01 false Reports. 270.205 Section 270.205... SAFETY TEAMS Investigations § 270.205 Reports. (a) Not later than 90 days after completing an investigation, a Team shall issue a public report which includes: (1) An analysis of the likely technical cause...

  9. 15 CFR 270.205 - Reports.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 15 Commerce and Foreign Trade 1 2014-01-01 2014-01-01 false Reports. 270.205 Section 270.205... SAFETY TEAMS Investigations § 270.205 Reports. (a) Not later than 90 days after completing an investigation, a Team shall issue a public report which includes: (1) An analysis of the likely technical cause...

  10. 15 CFR 270.205 - Reports.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 15 Commerce and Foreign Trade 1 2011-01-01 2011-01-01 false Reports. 270.205 Section 270.205... SAFETY TEAMS Investigations § 270.205 Reports. (a) Not later than 90 days after completing an investigation, a Team shall issue a public report which includes: (1) An analysis of the likely technical cause...

  11. Managing Biases in Product Development Teams: A Tale of Two Rocks

    ERIC Educational Resources Information Center

    Keene, Michael A.

    2017-01-01

    The management of product development teams is a challenging task, especially when success hinges on the ability to guide technical and nontechnical personnel through an effective decision-making process. The "Tale of Two Rocks" exercise illustrates how differing motivations and beliefs about new technologies can affect the decisions…

  12. Technical and physical analysis of the 2014 FIFA World Cup Brazil: winners vs. losers.

    PubMed

    Rumpf, Michael C; Silva, Joao R; Hertzog, Maxime; Farooq, Abdulaziz; Nassis, George

    2017-10-01

    The purpose of the present study was to investigate the technical and physical performance parameters that distinguish between teams winning and losing matches in the 2014 FIFA World Cup Brazil. Data were derived from the FIFA website and from live-statistics provided during each game of the world cup. Twelve physical (such as total distance covered in meters (TD), TD in distinct locomotor categories: low-intensity running (LIR; <11 km/h), moderate-intensity running (MIR; 11 to 14 km/h) and high-intensity-running (HIR; >14 km/h)) and 21 technical parameters (total passes, short-, medium- and long-distance passes, total pass completion rate, dangerous attacks, attacking attempts, delivery in penalty area, ball possession, goals, goals from set-pieces, goals per shot on goal, defending saves, shots, shots on goal, shot accuracy, set-pieces, crosses, corners, clearances, yellow cards) were analyzed. Forty-two games in which a winner and consequently a loser were presented after 90 minutes of game time were investigated with independent t-tests. A binary-logistic regression was utilized to investigate whether the significant variables predicted success of the winning teams. The winning teams scored significantly (P<0.05) greater amount of goals, goals per set-pieces, goals per shots on goals, shots on goal and shot accuracy and received significantly lower yellow cards. The binary-logistic regression utilized showed that shot accuracy was the best predictor for success. The physical parameters did not differ between teams winning and losing a match. Technical performance related to goal scoring parameters play a decisive role in World Cup games. Furthermore, scoring efficacy from open-play as well as from set-pieces are crucial to win matches in a World Cup tournament. At this level, physical performance was not the factor to discriminate between winners and losers.

  13. American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance Federal Aviation Administration Project 209 - Control Tower and Support Building, Las Vegas, NV

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Arends, J.; Sandusky, William F.

    2010-03-31

    This report represents findings of a design review team that evaluated construction documents (at the 70% level) and operating specifications for a new control tower and support building that will be built in Las Vegas, Nevada by the Federal Aviation Administration (FAA). The focus of the review was to identify measures that could be incorporated into the final design and operating specification that would result in additional energy savings for the FAA that would not have otherwise occurred.

  14. American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance Federal Aviation Administration – Project 209 Control Tower and Support Building Oakland, CA

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Arends, J.; Sandusky, William F.

    2010-03-01

    This report represents findings of a design review team that evaluated construction documents (at the 70% level) and operating specifications for a new control tower and support building that will be build at Oakland, California by the Federal Aviation Administration (FAA). The focus of the review was to identify measures that could be incorporated into the final design and operating specification that would result in additional energy savings for the FAA that would not have otherwise occurred.

  15. Problem Reporting Taxonomy and Data Preparation Tool Evaluation

    NASA Technical Reports Server (NTRS)

    Beil, Robert J.

    2010-01-01

    A member of the NASA Engineering and Safety Center (NESC) Systems Engineering Office (SEO) Technical Discipline Team (TDT) requested a SEO-managed activity to perform a gap analysis on the proposed NASA Standard 0006, "Common NASA Taxonomy for Problem Reporting, Analysis, and Resolution", and to create an input filter and set of instructions for using the data-mining/data-cleansing tool TechOasis1 with Space Shuttle Program (SSP) problem reporting data. The work that achieved these objectives and deployment of TechOasis are discussed in this report.

  16. Earth orbital teleoperator systems evaluation

    NASA Technical Reports Server (NTRS)

    Shields, N. L., Jr.; Slaughter, P. H.; Brye, R. G.; Henderson, D. E.

    1979-01-01

    The mechanical extension of the human operator to remote and specialized environments poses a series of complex operational questions. A technical and scientific team was organized to investigate these questions through conducting specific laboratory and analytical studies. The intent of the studies was to determine the human operator requirements for remotely manned systems and to determine the particular effects that various system parameters have on human operator performance. In so doing, certain design criteria based on empirically derived data concerning the ultimate control system, the human operator, were added to the Teleoperator Development Program.

  17. EOS Laser Atmosphere Wind Sounder (LAWS) investigation

    NASA Technical Reports Server (NTRS)

    Emmitt, George D.

    1991-01-01

    The related activities of the contract are outlined for the first year. These include: (1) attend team member meetings; (2) support EOS Project with science related activities; (3) prepare and Execution Phase plan; and (4) support LAWS and EOSDIS related work. Attached to the report is an appendix, 'LAWS Algorithm Development and Evaluation Laboratory (LADEL)'. Also attached is a copy of a proposal to the NASA EOS for 'LAWS Sampling Strategies and Wind Computation Algorithms -- Storm-Top Divergence Studies. Volume I: Investigation and Technical Plan, Data Plan, Computer Facilities Plan, Management Plan.'

  18. Outer planet Grand Tour missions photometry/polarimetry experiment critical components study

    NASA Technical Reports Server (NTRS)

    Pellicori, S. F.; Russell, E. E.; Watts, L. A.

    1972-01-01

    Work performed during this effort was limited to two primary areas of technical concern: optical design optimization, and sensor selection. An optical system concept was established, and various system components were evaluated through experimental test sequences. Photodetectors were investigated for the applicability in meeting OPGT requirements as constrained by the photometry/polarimetry team directives. The most promising (gallium arsenide PMT) was further experimentally tested to ascertain its behavior with respect to anticipated environmental conditions. Results of testing and summary of the preceding tradeoff study effort are presented.

  19. Modeling and Analysis of Multidiscipline Research Teams at NASA Langley Research Center: A Systems Thinking Approach

    NASA Technical Reports Server (NTRS)

    Waszak, Martin R.; Barthelemy, Jean-Francois; Jones, Kenneth M.; Silcox, Richard J.; Silva, Walter A.; Nowaczyk, Ronald H.

    1998-01-01

    Multidisciplinary analysis and design is inherently a team activity due to the variety of required expertise and knowledge. As a team activity, multidisciplinary research cannot escape the issues that affect all teams. The level of technical diversity required to perform multidisciplinary analysis and design makes the teaming aspects even more important. A study was conducted at the NASA Langley Research Center to develop a model of multidiscipline teams that can be used to help understand their dynamics and identify key factors that influence their effectiveness. The study sought to apply the elements of systems thinking to better understand the factors, both generic and Langley-specific, that influence the effectiveness of multidiscipline teams. The model of multidiscipline research teams developed during this study has been valuable in identifying means to enhance team effectiveness, recognize and avoid problem behaviors, and provide guidance for forming and coordinating multidiscipline teams.

  20. Quality user support: Supporting quality users

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Woolley, T.C.

    1994-12-31

    During the past decade, fundamental changes have occurred in technical computing in the oil industry. Technical computing systems have moved from local, fragmented quantity, to global, integrated, quality. The compute power available to the average geoscientist at his desktop has grown exponentially. Technical computing applications have increased in integration and complexity. At the same time, there has been a significant change in the work force due to the pressures of restructuring, and the increased focus on international opportunities. The profile of the user of technical computing resources has changed. Users are generally more mature, knowledgeable, and team oriented than theirmore » predecessors. In the 1990s, computer literacy is a requirement. This paper describes the steps taken by Oryx Energy Company to address the problems and opportunities created by the explosive growth in computing power and needs, coupled with the contraction of the business. A successful user support strategy will be described. Characteristics of the program include: (1) Client driven support; (2) Empowerment of highly skilled professionals to fill the support role; (3) Routine and ongoing modification to the support plan; (4) Utilization of the support assignment to create highly trained advocates on the line; (5) Integration of the support role to the reservoir management team. Results of the plan include a highly trained work force, stakeholder teams that include support personnel, and global support from a centralized support organization.« less

  1. Delivery of high-tech home care by hospital-based nursing units in Quebec: clinical and technical challenges.

    PubMed

    Lehoux, Pascale; Richard, L; Pineault, R; Saint-Arnaud, J

    2006-03-01

    The role that hospital-based nurses should play in the delivery of high-tech home care, and how they should be supported in that role, are topics that remain understudied. Our research objective was to document how hospital-based nursing teams perceive and deal with the clinical and technical challenges associated with the provision of high-tech home care. Four home care interventions were selected: antibiotic intravenous therapy, parenteral nutrition, peritoneal dialysis and oxygen therapy. A self-administered survey was sent to all hospital-based units providing these interventions in the province of Quebec, Canada (n = 154; response rate: 70.8%). We used descriptive statistical analyses to derive mean values for scores on either a five- or a six-level Likert scale. Despite variation across the four interventions, our results indicate that while nursing teams believe these interventions increase patients' autonomy, they also recognize that they generate anxiety and impose constraints on patients' lives. Nurses must increase efforts to deal with both clinical and technical challenges and help patients overcome the barriers to appropriate use of home care technologies. While nursing teams generally perceive high-tech home care as beneficial, they still experience significant technical and clinical challenges. Some of these challenges could be addressed by strengthening professional training initiatives, while others require broader home care policy interventions.

  2. IDC Reengineering Phase 2 Project Scope.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Harris, James M.

    This report provides a brief description of the scope of the IDC Reengineering Phase 2 project. It describes the goals and objectives of reengineering, the system definition, and the technical scope of the system. REVISIONS Version Date Author/Team Revision Description Authorized by 1.0 9/25/2014 SNL IDC Reengineering Team Unlimited Release for I2 M. Harris 1.1 28/01/2015 IDC Reengineering Team Align with previous IDC scope document E. Tomuta.

  3. Improving the Flow

    NASA Technical Reports Server (NTRS)

    2004-01-01

    In early 1995, NASA s Glenn Research Center (then Lewis Research Center) formed an industry-government team with several jet engine companies to develop the National Combustion Code (NCC), which would help aerospace engineers solve complex aerodynamics and combustion problems in gas turbine, rocket, and hypersonic engines. The original development team consisted of Allison Engine Company (now Rolls-Royce Allison), CFD Research Corporation, GE Aircraft Engines, Pratt and Whitney, and NASA. After the baseline beta version was established in July 1998, the team focused its efforts on consolidation, streamlining, and integration, as well as enhancement, evaluation, validation, and application. These activities, mainly conducted at NASA Glenn, led to the completion of NCC version 1.0 in October 2000. NCC version 1.0 features high-fidelity representation of complex geometry, advanced models for two-phase turbulent combustion, and massively parallel computing. Researchers and engineers at Glenn have been using NCC to provide analysis and design support for various aerospace propulsion technology development projects. NASA transfers NCC technology to external customers using non- exclusive Space Act Agreements. Glenn researchers also communicate research and development results derived from NCC's further development through publications and special sessions at technical conferences.

  4. Marine Optical Characterizations

    NASA Technical Reports Server (NTRS)

    Clark, Dennis K.

    1996-01-01

    The team's major emphasis during this reporting period has been focused on the completion of the operational versions of the Marine Optical Buoys (MOBY's). Other work areas consisted of designing and testing bio-optical instrumentation, evaluating several of the SeaWiFS bio-optical protocols, processing data collected during field experiments, and reprocessing several of the Marine Optical Characteristics Experiment (MOCE) 2 and 3 bio-optical data sets. The team conducted one trip to the operations site in Honolulu, Hawaii, making necessary preparations for future field experiments. Part of the team also traveled to Moss Landing Marine Laboratories, Salinas, CA, and to American Holographic Co. Fitchburg MA, to assist with the fabrication of the next generation Marine Optical Buoys. Technical memoranda are being written to address the remote sensing reflectance, and instrument self-shading protocols. During the Ocean Color 96 meeting discussions with the Spanish on acquiring research vessel support during the MODIS validation period were conducted. A proposal will be generated towards this purpose for an experiment to be conducted off the North African coast during the summer of 1999.

  5. Advancing Next-Generation Energy in Indian Country (Fact Sheet)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This fact provides information on the Strategic Technical Assistance Response Team (START) Program, a U.S. Department of Energy Office of Indian Energy Policy and Programs (DOE-IE) initiative to provide technical expertise to support the development of next-generation energy projects in Indian Country.

  6. Advancing Energy Development in Indian Country (Fact Sheet)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This fact sheet provides information on the Strategic Technical Assistance Response Team (START) Program, a U.S. Department of Energy Office of Indian Energy Policy and Programs (DOE-IE) initiative to provide technical expertise to support the development of next-generation energy projects in Indian Country.

  7. Renewable Energy Project Development Assistance (Fact Sheet)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This fact sheet provides information on the Tribes selected to receive assistance from the U.S. Department of Energy Office of Indian Energy 2013 Strategic Technical Assistance Response Team (START) Program, which provides technical expertise to support the development of next-generation energy projects on tribal lands.

  8. Enhancing Tribal Energy Security and Clean Energy (Fact Sheet)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This fact provides information on the Strategic Technical Assistance Response Team (START) Program, a U.S. Department of Energy Office of Indian Energy Policy and Programs (DOE-IE) initiative to provide technical expertise to support the development of next-generation energy projects in Indian Country.

  9. JPL Innovation Foundry

    NASA Technical Reports Server (NTRS)

    Sherwood, Brent; McCleese, Daniel J.

    2012-01-01

    NASA supports the community of mission principal investigators by helping them ideate, mature, and propose concepts for new missions. As NASA's Federally Funded Research and Development Center (FFRDC), JPL is a primary resource for providing this service. The environmental context for the formulation lifecycle evolves continuously. Contemporary trends include: more competitors; more-complex mission ideas; scarcer formulation resources; and higher standards for technical evaluation. Derived requirements for formulation support include: stable, clear, reliable methods tailored for each stage of the formulation lifecycle; on-demand access to standout technical and programmatic subject-matter experts; optimized, outfitted facilities; smart access to learning embodied in a vast oeuvre of prior formulation work; hands-on method coaching. JPL has retooled its provision of integrated formulation lifecycle support to PIs, teams, and program offices in response to this need. This mission formulation enterprise is the JPL Innovation Foundry.

  10. UK dental laboratory technicians' views on the efficacy and teaching of clinical-laboratory communication.

    PubMed

    Juszczyk, A S; Clark, R K F; Radford, D R

    2009-05-23

    The General Dental Council states that 'good dental care is delivered by a team' and restorative treatment is enhanced by communication between team members. Commercial dental laboratories are ideally placed to comment on effective communication. To investigate contemporary attitudes and communication between dentist and dental technician from the technician's perspective. Eight hundred and three dental laboratories were invited to take part in a postal survey covering dentist/laboratory communication and the dentist's understanding of technical procedures. Forty percent of laboratories responded. Only 9% scored communication as very good, 48% scored communication with newly qualified dentists better than with established dentists but only 26% considered that dental students were taught to communicate with dental laboratories effectively. The free comments that the respondents were invited to make identified three distinct themes, 'recognition within the dental team', 'effective communication between dentist and dental technician' and 'dentists lack of technical knowledge'. Effective communication between dentist and dental technician is often poor. It was the view of the dental technicians who responded that newly qualified dentists do not have an appropriate understanding of technical techniques. Dental schools are still not preparing new graduates to communicate effectively with dental laboratories.

  11. Capability of Rolling Efficiency for 100M High-Speed Rails

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Huang, Howard

    2014-03-22

    OG Technologies, Inc. (OGT), along with its academic and industrial partners, proposes this CORE project for the Capability of Rolling Efficiency for 100m high-speed rails. The goal is to establish the competitive advantage, and thus the sustainability of the US-based rail manufacturers by greatly enhanced efficiency through innovative in-line metrology technology, in-depth process knowledge, and advanced process control to overcome detrimental factors such as higher labor costs that are saddling the US manufacturing sector. This Phase I project was carried out by an industrial-academia team over 9 months. The R&D team successfully completed all technical tasks and accomplished the objectivesmore » for the Phase I. In addition to the technical efforts, the introductory information of this project as well as anticipated progress was disseminated to steel mills interested in the project. The Phase I project has established the technical and commercial basis for additional development. There are needs to further completing the in-line sensing capability, deepening the capability of metamodeling, and supporting the process monitoring and control. The R&D team plans to submit a Phase II proposal based on the findings.« less

  12. Teaching communication and supporting autonomy with a team-based operative simulator.

    PubMed

    Cook, Mackenzie R; Deal, Shanley B; Scott, Jessica M; Moren, Alexis M; Kiraly, Laszlo N

    2016-09-01

    Changing residency structure emphasizes the need for formal instruction on team leadership and intraoperative teaching skills. A high fidelity, multi-learner surgical simulation may offer opportunities for senior learners (SLs) to learn these skills while teaching technical skills to junior learners (JLs). We designed and optimized a low-cost inguinal hernia model that paired JLs and SLs as an operative team. This was tested in 3 pilot simulations. Participants' feedback was analyzed using qualitative methods. JL feedback to SLs included the themes "guiding and instructing" and "allowing autonomy." Senior Learner feedback to JLs focused on "mechanics," "knowledge," and "perspective/flow." Both groups focused on "communication" and "professionalism." A multi-learner simulation can successfully meet the technical learning needs of JLs and the teaching and communication learning needs of SLs. This model of resident-driven simulation may illustrate future opportunities for operative simulation. Copyright © 2016 Elsevier Inc. All rights reserved.

  13. Electric power from sugar cane in Costa Rica. A technical and economic analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tugwell, F.; Gowen, M.; Kenda, W.

    1988-07-01

    A team of specialists visited Costa Rica in May 1988 to analyze the potential for production and sale of electricity by the sugar-cane industry. Focusing on three sugar mills, the team made technical projections at four levels of investment, ranging from the simplest sale of surplus power to the installation of new turbogenerator systems. For each level, capital costs, electricity production and sales, and fuel options were estimated. Associated risks were assessed through sensitivity analyses to demonstrate the possible impacts of varying interest rates, fuel costs, and electricity sales prices. The team concluded that production and sale of electricity formore » the national grid could be an excellent investment opportunity for the sugar industry and would provide important economic benefits, including creation of additional jobs in rural areas, diversification of the sugar industry, and (in the short term) displacement of the need for imported fuels.« less

  14. Geophysics field school: A team-based learning experience for students and faculty

    NASA Astrophysics Data System (ADS)

    Karchewski, B.; Innanen, K. A.; Lauer, R. M.; Pidlisecky, A.

    2016-12-01

    The core challenge facing a modern science educator is to deliver a curriculum that reaches broadly and deeply into the technical domain, while also helping students to develop fundamental scientific skills such as inquiry, critical thinking and technical communication. That is, our aim is for students to achieve significant learning at all levels summarized by Bloom's Taxonomy of Educational Objectives. It is not always clear how to achieve the full spectrum of goals, with much debate over which component is more important in a science education. Team-based and experiential learning are research-supported approaches that aim to reach across the spectrum by placing students in a setting where they solve practical problems in teams of peers. This learning mode modifies the role of the instructor to a guide or facilitator, and students take a leadership role in their own education. We present a case study of our team's implementation of team-based learning in a geophysics field school, an inherently experiential learning environment. The core philosophies behind our implementation are to present clearly defined learning outcomes, to recognize that students differ in their learning modalities and to strive to engage students through a range of evidence-based learning experiences. We discuss the techniques employed to create functional teams, the key learning activities involved in a typical day of field school and data demonstrating the learning activities that showed the strongest correlation to overall performance in the course. In the process, we also realized that our team-based approach to course design and implementation also enhanced our skillsets as educators, and our institution recently recognized our efforts with a team teaching award. Therefore, we conclude with some of our observations of best practices for team teaching in a field setting to initiate discussions with colleagues engaged in similar activities.

  15. US forest service technical cooperation visit Badia Rangeland and irrigation analysis

    USDA-ARS?s Scientific Manuscript database

    A US Forest Service (USFS) team comprised of a rangeland management advisor, a dryland water resource, and irrigation specialist, and a Middle East program specialist visited Jordan to provide technical assistance to the Ministry of Agriculture-Water Harvesting Directorate (MoA) and the Hashemite Fu...

  16. Seven Personal Accounts from the 2012 ACTE Fellowship Team

    ERIC Educational Resources Information Center

    Strebe, Connie; Mosley, Chaney; Biggerstaff, Patrick; Cox, Lynne Cagle; Williams, Hershel; Lindsley, Dawn; Umehira, Ron

    2013-01-01

    Each year since 2009, the Association for Career and Technical Education (ACTE) has supported the National Leadership Fellowship Program. This program is geared towards individuals with a desire not only to develop their own leadership skills, but also to become advocates for career and technical education (CTE). Responsibilities and expectations…

  17. Occupant Protection during Orion Crew Exploration Vehicle Landings

    NASA Technical Reports Server (NTRS)

    Gernhardt, Michael L.; Jones, J. A.; Granderson, B. K.; Somers, J. T.

    2009-01-01

    The constellation program is evaluating current vehicle design capabilities for nominal water landings and contingency land landings of the Orion Crew Exploration vehicle. The Orion Landing Strategy tiger team was formed to lead the technical effort for which associated activities include the current vehicle design, susceptibility to roll control and tip over, reviewing methods for assessing occupant injury during ascent / aborts /landings, developing an alternate seat/attenuation design solution which improves occupant protection and operability, and testing the seat/attenuation system designs to ensure valid results. The EVA physiology, systems and Performance (EPSP) project is leading the effort under the authority of the Tiger Team Steering committee to develop, verify, validate and accredit biodynamics models using a variety of crash and injury databases including NASCAR, Indy Car and military aircraft. The validated biodynamics models will be used by the Constellation program to evaluate a variety of vehicle, seat and restraint designs in the context of multiple nominal and off-nominal landing scenarios. The models will be used in conjunction with Acceptable Injury Risk definitions to provide new occupant protection requirements for the Constellation Program.

  18. Identification of a Smartphone User via Keystroke Analysis

    DTIC Science & Technology

    2014-03-01

    Participation for the study was solicited via email to students and faculty of the Computer Science Department and Cyber Academic Group at the Naval...taken a monumental effort, but some of our team members are on the verge of burnout . I believe a short break would work wonders for our technical team

  19. Chemicals in Schools: Solutions for Healthy School Environments. K-12 Schools

    ERIC Educational Resources Information Center

    US Environmental Protection Agency, 2006

    2006-01-01

    School leaders play a pivotal role in keeping schools safe from chemical accidents. Readers of this brochure can help schools develop a chemical cleanout and prevention program and assemble a team of teachers, facilities staff, and administrators with technical expertise to assess chemical safety issues and set policy. Some important team roles…

  20. VOCATIONAL EDUCATION IN UTAH, A SURVEY REPORT.

    ERIC Educational Resources Information Center

    George Peabody Coll. for Teachers, Nashville, TN. Div. of Surveys and Field Services.

    TO DEVELOP PLANS FOR A LONG RANGE PROGRAM OF DEVELOPMENT AND IMPROVEMENT, A 15-MEMBER TEAM FROM 12 STATES SURVEYED 14 AREAS OF VOCATIONAL-TECHNICAL EDUCATION. TEAM MEMBERS, WORKING WITH THE STAFF OF THE DEPARTMENT OF PUBLIC INSTRUCTION, COLLECTED DATA FROM STATE OFFICES AND VISITED SELECTED SCHOOLS THROUGHOUT THE STATE. THE STUDY WAS CONCERNED…

  1. 22 CFR 103.3 - Requirement to provide a sample.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... will notify appropriate site representatives of any request by an Inspection Team to take a sample. At... Inspection Team of the Technical Secretariat. (f) Person to take a sample. If a sample is required, the owner... restrict activities regarding sampling, e.g., conditions that restrict where, when, and how samples are...

  2. Delegation and Other Teambuilding Processes: Transforming Your Department and Programs.

    ERIC Educational Resources Information Center

    Phelan, Daniel

    Team building and delegation are two of the most important tools available to division chairs or academic officers for increasing productivity and allowing employees to grow, but they are both often misunderstood, misused, or unused. Teams are small groups with the authority and technical, interpersonal, and managerial skills to carry out…

  3. Teleconsultation in school settings: linking classroom teachers and behavior analysts through web-based technology.

    PubMed

    Frieder, Jessica E; Peterson, Stephanie M; Woodward, Judy; Crane, Jaelee; Garner, Marlane

    2009-01-01

    This paper describes a technically driven, collaborative approach to assessing the function of problem behavior using web-based technology. A case example is provided to illustrate the process used in this pilot project. A school team conducted a functional analysis with a child who demonstrated challenging behaviors in a preschool setting. Behavior analysts at a university setting provided the school team with initial workshop trainings, on-site visits, e-mail and phone communication, as well as live web-based feedback on functional analysis sessions. The school personnel implemented the functional analysis with high fidelity and scored the data reliably. Outcomes of the project suggest that there is great potential for collaboration via the use of web-based technologies for ongoing assessment and development of effective interventions. However, an empirical evaluation of this model should be conducted before wide-scale adoption is recommended.

  4. X-33. Phase 2

    NASA Technical Reports Server (NTRS)

    1998-01-01

    In response to the Cooperative Agreement, Lockheed Martin Skunk Works has compiled an Annual Performance Report of the X-33/RLV Program. This report consists of individual reports from all industry team members, as well as NASA team centers. The first milestone was hand delivered to NASA MSFC. The second year has been one of significant accomplishment in which team members have demonstrated their ability to meet vital benchmarks while continuing on the technical adventure of the 20th century.

  5. Team Training and Institutional Protocols to Prevent Shoulder Dystocia Complications.

    PubMed

    Smith, Samuel

    2016-12-01

    Shoulder dystocia is an obstetrical emergency that may result in significant neonatal complications. It requires rapid recognition and a coordinated response. Standardization of care, teamwork and communication, and clinical simulation are the key components of patient safety programs in obstetrics. Simulation-based team training and institutional protocols for the management of shoulder dystocia are emerging as integral components of many labor and delivery safety initiatives because of their impact on technical skills and team performance.

  6. NASA's Gravitational - Wave Mission Concept Study

    NASA Technical Reports Server (NTRS)

    Stebbins, Robin; Jennrich, Oliver; McNamara, Paul

    2012-01-01

    With the conclusion of the NASA/ESA partnership on the Laser Interferometer Space Antenna (LISA) Project, NASA initiated a study to explore mission concepts that will accomplish some or all of the LISA science objectives at lower cost. The Gravitational-Wave Mission Concept Study consisted of a public Request for Information (RFI), a Core Team of NASA engineers and scientists, a Community Science Team, a Science Task Force, and an open workshop. The RFI yielded were 12 mission concepts, 3 instrument concepts and 2 technologies. The responses ranged from concepts that eliminated the drag-free test mass of LISA to concepts that replace the test mass with an atom interferometer. The Core Team reviewed the noise budgets and sensitivity curves, the payload and spacecraft designs and requirements, orbits and trajectories and technical readiness and risk. The Science Task Force assessed the science performance by calculating the horizons. the detection rates and the accuracy of astrophysical parameter estimation for massive black hole mergers, stellar-mass compact objects inspiraling into central engines. and close compact binary systems. Three mission concepts have been studied by Team-X, JPL's concurrent design facility. to define a conceptual design evaluate kt,y performance parameters. assess risk and estimate cost and schedule. The Study results are summarized.

  7. Development and implementation of centralized simulation training: evaluation of feasibility, acceptability and construct validity.

    PubMed

    Shamim Khan, Mohammad; Ahmed, Kamran; Gavazzi, Andrea; Gohil, Rishma; Thomas, Libby; Poulsen, Johan; Ahmed, Munir; Jaye, Peter; Dasgupta, Prokar

    2013-03-01

    WHAT'S KNOWN ON THE SUBJECT? AND WHAT DOES THE STUDY ADD?: A competent urologist should not only have effective technical skills, but also other attributes that would make him/her a complete surgeon. These include team-working, communication and decision-making skills. Although evidence for effectiveness of simulation exists for individual simulators, there is a paucity of evidence for utility and effectiveness of these simulators in training programmes that aims to combine technical and non-technical skills training. This article explains the process of development and validation of a centrally coordinated simulation program (Participants - South-East Region Specialist Registrars) under the umbrella of the British Association for Urological Surgeons (BAUS) and the London Deanery. This program incorporated training of both technical (synthetic, animal and virtual reality models) and non-technical skills (simulated operating theatres). To establish the feasibility and acceptability of a centralized, simulation-based training-programme. Simulation is increasingly establishing its role in urological training, with two areas that are relevant to urologists: (i) technical skills and (ii) non-technical skills. For this London Deanery supported pilot Simulation and Technology enhanced Learning Initiative (STeLI) project, we developed a structured multimodal simulation training programme. The programme incorporated: (i) technical skills training using virtual-reality simulators (Uro-mentor and Perc-mentor [Symbionix, Cleveland, OH, USA], Procedicus MIST-Nephrectomy [Mentice, Gothenburg, Sweden] and SEP Robotic simulator [Sim Surgery, Oslo, Norway]); bench-top models (synthetic models for cystocopy, transurethral resection of the prostate, transurethral resection of bladder tumour, ureteroscopy); and a European (Aalborg, Denmark) wet-lab training facility; as well as (ii) non-technical skills/crisis resource management (CRM), using SimMan (Laerdal Medical Ltd, Orpington, UK) to teach team-working, decision-making and communication skills. The feasibility, acceptability and construct validity of these training modules were assessed using validated questionnaires, as well as global and procedure/task-specific rating scales. In total 33, three specialist registrars of different grades and five urological nurses participated in the present study. Construct-validity between junior and senior trainees was significant. Of the participants, 90% rated the training models as being realistic and easy to use. In total 95% of the participants recommended the use of simulation during surgical training, 95% approved the format of the teaching by the faculty and 90% rated the sessions as well organized. A significant number of trainees (60%) would like to have easy access to a simulation facility to allow more practice and enhancement of their skills. A centralized simulation programme that provides training in both technical and non-technical skills is feasible. It is expected to improve the performance of future surgeons in a simulated environment and thus improve patient safety. © 2012 BJU International.

  8. Bringing Home a Piece of Mars from the Utah Desert: A Canadian Robotic Deployment in Support of Mars Sample Return

    NASA Astrophysics Data System (ADS)

    Haltigin, T.; Hipkin, V.; Picard, M.

    2016-12-01

    Mars Sample Return (MSR) remains one of the highest priorities of the international planetary science community. While the overall mission architecture required for MSR is relatively well defined, there remain a number of open questions regarding its implementation. In preparing for an eventual MSR campaign, simulating portions of the sample collection mission can provide important insight to address existing knowledge gaps. In 2015 and 2016, the Canadian Space Agency (CSA) led robotic deployments to address a variety of technical, scientific, operational, and educational objectives. Here we report on the results. The deployments were conducted at a field site near Hanskville, UT, USA, chosen to satisfy scientific, technical, and logistical considerations. The geology of the region is dominated by Jurassic-aged sandstones and mudstones, indicative of an ancient sedimentary environment. Moreover, a series of linear topographically inverted features are present, similar to morphologies observed in particular Martian landscapes. On both Earth and Mars, these features are interpreted as lithified and exhumed river channels. A science operations center was established in London, ON, Canada, at Western University. Here, a science team of > 30 students and professionals - unaware of the rover's actual location - were responsible for generating daily science plans, requesting observations, and interpreting downloaded data, all while respecting Mars-realistic flight rules and constraints for power, scheduling, and data. Rover commanding was performed by an engineering team at CSA headquarters in St. Hubert, QC, Canada, while a small out-of-simulation field team was present on-site to ensure safe operations of the rover and to provide data transfers. Between the 2015 and 2016 campaigns, nearly five weeks of operations were conducted. The team successfully collected scientifically-selected samples to address the group objectives, and the rover demonstrated system integration and a variety of navigational techniques. Forward work involves laboratory-based validation of the returned samples to evaluate the efficiency of the in-simulation operational decision-making.

  9. Environmental control medical support team

    NASA Technical Reports Server (NTRS)

    Crump, William J.; Kilgore, Melvin V., Jr.

    1988-01-01

    The activities conducted in support of the Environmental Control and Life Support Team during December 7, 1987 through September 30, 1988 are summarized. The majority of the ongoing support has focused on the ECLSS area. Through a series of initial meetings with the ECLSS team and technical literature review, an initial list of critical topics was developed. Subtasks were then identified or additional related tasks received as action items from the ECLSS group meetings. Although most of the efforts focused on providing MSFC personnel with information regarding specific questions and problems related to ECLSS issues, other efforts regarding identifying an ECLSS Medical Support Team and constructing data bases of technical information were also initiated and completed. The specific tasks are as follows: (1) Provide support to the mechanical design and integration of test systems as related to microbiological concerns; (2) Assist with design of Human Subjects Test Protocols; (3) Interpretation and recommendations pertaining to air/water quality requirements; (4) Assist in determining the design specifications required as related to the Technical Demonstration Program; (5) Develop a data base of all microorganisms recovered from previous subsystem testing; (6) Estimates of health risk of individual microbes to test subjects; (7) Assist with setting limits for safety of test subjects; (8) Health monitoring of test subjects; (9) Assist in the preparation of test plans; (10) Assist in the development of a QA/QC program to assure the validity, accuracy and precision of the analyses; and (11) Assist in developing test plans required for future man in the loop testing.

  10. The impact of nontechnical skills on technical performance in surgery: a systematic review.

    PubMed

    Hull, Louise; Arora, Sonal; Aggarwal, Rajesh; Darzi, Ara; Vincent, Charles; Sevdalis, Nick

    2012-02-01

    Failures in nontechnical and teamwork skills frequently lie at the heart of harm and near-misses in the operating room (OR). The purpose of this systematic review was to assess the impact of nontechnical skills on technical performance in surgery. MEDLINE, EMBASE, PsycINFO databases were searched, and 2,041 articles were identified. After limits were applied, 341 articles were retrieved for evaluation. Of these, 28 articles were accepted for this review. Data were extracted from the articles regarding sample population, study design and setting, measures of nontechnical skills and technical performance, study findings, and limitations. Of the 28 articles that met inclusion criteria, 21 articles assessed the impact of surgeons' nontechnical skills on their technical performance. The evidence suggests that receiving feedback and effectively coping with stressful events in the OR has a beneficial impact on certain aspects of technical performance. Conversely, increased levels of fatigue are associated with detriments to surgical skill. One article assessed the impact of anesthesiologists' nontechnical skills on anesthetic technical performance, finding a strong positive correlation between the 2 skill sets. Finally, 6 articles assessed the impact of multiple nontechnical skills of the entire OR team on surgical performance. A strong relationship between teamwork failure and technical error was empirically demonstrated in these studies. Evidence suggests that certain nontechnical aspects of performance can enhance or, if lacking, contribute to deterioration of surgeons' technical performance. The precise extent of this effect remains to be elucidated. Copyright © 2012 American College of Surgeons. Published by Elsevier Inc. All rights reserved.

  11. Technical/ administrative options for managing tritium MCL exceedances in P-area groundwater and Steel Creek

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ross, J.

    2017-04-01

    This white paper was requested by the Core Team (United States Department of Energy [USDOE], United States Environmental Protection Agency [USEPA], and South Carolina Department of Health and Environmental Control [SCDHEC]) at the P-Area Groundwater (PAGW) Operable Unit (OU) Scoping Meeting held in January 2017 to discuss recent data and potential alternatives in support of a focused Corrective Measures Study/Feasibility Study (CMS/FS). This white paper presents an overview of the problem, and a range of technical and administrative options for addressing the tritium contamination in groundwater and Steel Creek. As tritium cannot be treated practicably, alternatives are limited to mediamore » transfer, containment and natural attenuation principally relying on radioactive decay. Using other groundwater OU decisions involving tritium as precedent, Savannah River Nuclear Solutions (SRNS) recommends that final tritium alternatives be evaluated in a CMS/FS, understanding that the likely preferred remedy will include natural attenuation with land use controls (LUCs). This is based on the inability to significantly reduce tritium impact to Steel Creek using an engineered solution as compared to natural attenuation. The timing of this evaluation could be conducted concurrently with the final remedy evaluation for volatile organic compounds (VOCs).« less

  12. CTEF 2.0 - Assessment and Improvement of Command Team Effectiveness: Verification of Model and Instrument (CTEF 2.0 - Diagnostic et Amelioration de l’Efficacite d’un Team de Commandement: Verification du Modele et de l’Instrument)

    DTIC Science & Technology

    2010-09-01

    what level of detail is needed to build their teams, and they can add more detailed items from the model in order to tap deeper in the performance of...of a project on ‘Command Team Effectiveness’ by Task Group 127 for the RTO Human Factors and Medicine Panel (RTG HFM-127). Published...vérification du modèle et de l’instrument) This Technical Report documents the findings of a project on ‘Command Team Effectiveness’ by Task Group

  13. Integrating team training strategies into obstetrical emergency simulation training.

    PubMed

    Daniel, Linda T; Simpson, Ellen K

    2009-01-01

    Successful management of obstetrical emergencies such as shoulder dystocia requires the coordinated efforts of a multidisciplinary team of professionals. Simulation education provides an opportunity to learn and master simple as well as complex technical skills needed in emergent situations. Team training has been shown to improve the quality of communication among team members and consequently has an enormous impact on human performance. In the healthcare environment, especially obstetrics where the stakes are high, integrating team training into simulation education can advance efforts to create and sustain a culture of safety. With over 7,100 deliveries annually, our 1,100-bed, two-hospital regional healthcare system embarked on this journey to advance the culture of safety.

  14. Final recovery plan of the southwestern willow flycatcher (Empidonax traillii extimus)

    Treesearch

    Deborah M. Finch; Stephen I. Rothstein; Jon C. Boren; William L. Graf; Jerry L. Holechek; Barbara E. Kus; Robert M. Marshall; Molly M. Pohl; Susan J. Sferra; Mark K. Sogge; Julie C. Stromberg; Bradley A. Valentine; Mary J. Whitfield; Sartor O. Williams

    2002-01-01

    The Southwestern Willow Flycatcher Recovery Team is composed of a Technical Subgroup (pg. ii), six Implementation Subgroups (Appendix A), and a Tribal Working Group. The Technical Subgroup consists of 14 academic scientists, researchers, and resource managers with a wide range of expertise in avian biology and ecology, southwestern willow flycatcher ecology, cowbird...

  15. Interagency Collaboration for Young Adults with Deaf-Blindness: Toward a Common Transition Goal.

    ERIC Educational Resources Information Center

    Everson, Jane M.; And Others

    This monograph is a compilation of the knowledge gained by the Technical Assistance Center (TAC) of the Helen Keller National Center, from training and technical assistance activities conducted with state interagency teams serving youth and young adults with deaf-blindness. The book views interagency collaboration as essential in achieving…

  16. A VIRTUAL TECHNICAL SYSTEMS AUDIT OF RESEARCH QUALITY ASSURANCE AND RECORD MANAGEMENT SYSTEMS IN ORD, U.S EPA

    EPA Science Inventory

    NHEERL conducts technical systems audits (TSAs) on its research projects. The findings are reported by the QA Manager (QAM) to the Director of QA (DQA) as Exemplary Findings (things the QA Team liked); Corrective Actions (things that must be corrected immediately); and Areas for...

  17. Work with Us | State, Local, and Tribal Governments | NREL

    Science.gov Websites

    take advantage of our policy, market, and technical expertise. Here's how you can work with us to meet (STAT)-solar market expertise and policy best practices Energy Efficiency Technical Assistance Team -energy efficiency policy and program expertise for states Tribal energy decision support-resources and

  18. Integrated Basic Education and Skills Training (I-BEST). Washington's Community and Technical Colleges

    ERIC Educational Resources Information Center

    Washington State Board for Community and Technical Colleges, 2014

    2014-01-01

    Washington's Integrated Basic Education and Skills Training Program (I-BEST) quickly teaches students literacy, work, and college-readiness skills so they can move through school and into living wage jobs faster. Pioneered by Washington's community and technical colleges, I-BEST uses a team-teaching approach to combine college-readiness classes…

  19. UV Coatings, Polarization, and Coronagraphy

    NASA Technical Reports Server (NTRS)

    Bolcar, Matthew R.; Quijada, Manuel; West, Garrett; Balasubramanian, Bala; Krist, John; Martin, Stefan; Sabatke, Derek

    2016-01-01

    Presenation for the Large UltraViolet Optical Infrared (LUVOIR) and Habitable Exoplanet Imager (HabEx) Science and Technology Definition Teams (STDT) on technical considerations regarding ultraviolet coatings, polarization, and coronagraphy. The presentations review the state-of-the-art in ultraviolet coatings, how those coatings generate polarization aberrations, and recent study results from both the LUVOIR and HabEx teams.

  20. Simulation Models for Developing an Individualized, Performance Criterion Learning Situation. Technical Monograph No. 21.

    ERIC Educational Resources Information Center

    Anderson, G. Ernest, Jr.

    The mission of the simulation team of the Model Elementary Teacher Education Project, 1968-71, was to develop simulation tools and conduct appropriate studies of the anticipated operation of that project. The team focused on the experiences of individual students and on the resources necessary for these experiences to be reasonable. This report…

  1. Anticipatory ethics for a future Internet: analyzing values during the design of an Internet infrastructure.

    PubMed

    Shilton, Katie

    2015-02-01

    The technical details of Internet architecture affect social debates about privacy and autonomy, intellectual property, cybersecurity, and the basic performance and reliability of Internet services. This paper explores one method for practicing anticipatory ethics in order to understand how a new infrastructure for the Internet might impact these social debates. This paper systematically examines values expressed by an Internet architecture engineering team-the Named Data Networking project-based on data gathered from publications and internal documents. Networking engineers making technical choices also weigh non-technical values when working on Internet infrastructure. Analysis of the team's documents reveals both values invoked in response to technical constraints and possibilities, such as efficiency and dynamism, as well as values, including privacy, security and anonymity, which stem from a concern for personal liberties. More peripheral communitarian values espoused by the engineers include democratization and trust. The paper considers the contextual and social origins of these values, and then uses them as a method of practicing anticipatory ethics: considering the impact such priorities may have on a future Internet.

  2. Report: Searching for a way to sustainability: technical and policy analyses of solid waste issues in Kathmandu.

    PubMed

    Dangi, Mohan B; Cohen, Ronald R H; Urynowicz, Michael A; Poudyal, Khem N

    2009-05-01

    Kathmandu Metropolitan City has attempted to reorganize its solid waste management a number of times. The German Technical and Financial Aid Organization led early efforts that were followed by a number of more recent experiments that left the city with an unsustainable solid waste management system following the termination of foreign aid. To examine this failure, the research team evaluated household surveys, field observations, interviews, and other primary and secondary information within the context of technical, social, and institutional analyses. The survey results show that the solid waste collection rates are far below the 90% claimed by the metropolis and street sweeping consumes approximately 51% of its solid waste budget. As a result of the relatively low collection rates the city residents are encouraged to dump waste into public lands. Consequently, too much of the city's resources are focused on sweeping rather than collection. Kathmandu needs to recognize informal waste picking, privatize, use local techniques, build capacity, promote bottom-up and participatory styles of management, and regulate policies to maintain solid waste management.

  3. NASAwide electronic publishing system: Prototype STI electronic document distribution, stage-4 evaluation report

    NASA Technical Reports Server (NTRS)

    Tuey, Richard C.; Collins, Mary; Caswell, Pamela; Haynes, Bob; Nelson, Michael L.; Holm, Jeanne; Buquo, Lynn; Tingle, Annette; Cooper, Bill; Stiltner, Roy

    1996-01-01

    This evaluation report contains an introduction, seven chapters, and five appendices. The Introduction describes the purpose, conceptual frame work, functional description, and technical report server of the STI Electronic Document Distribution (EDD) project. Chapter 1 documents the results of the prototype STI EDD in actual operation. Chapter 2 documents each NASA center's post processing publication processes. Chapter 3 documents each center's STI software, hardware, and communications configurations. Chapter 7 documents STI EDD policy, practices, and procedures. The appendices, which arc contained in Part 2 of this document, consist of (1) STI EDD Project Plan, (2) Team members, (3) Phasing Schedules, (4) Accessing On-line Reports, and (5) Creating an HTML File and Setting Up an xTRS. In summary, Stage 4 of the NASAwide Electronic Publishing System is the final phase of its implementation through the prototyping and gradual integration of each NASA center's electronic printing systems, desktop publishing systems, and technical report servers to be able to provide to NASA's engineers, researchers, scientists, and external users the widest practicable and appropriate dissemination of information concerning its activities and the result thereof to their work stations.

  4. Technical activity profile and influence of body anthropometry on playing performance in female elite team handball.

    PubMed

    Michalsik, Lars B; Aagaard, Per; Madsen, Klavs

    2015-04-01

    To determine the physical demands placed on female elite team handball (TH) players in relation to playing position and body anthropometry, female elite TH primarily field players were monitored during match-play using video recording and subsequent computerized technical match analysis during 5 regular tournament match seasons. Technical match activities were distributed in 6 major types of playing actions (shots, breakthroughs, fast breaks, technical errors, defensive errors, and tackles) and further divided into various subcategories (e.g., type of shot, hard or light tackles, claspings, screenings, and blockings). Furthermore, anthropometric measurements were performed. Each player had 28.3 ± 11.0 (group means ± SD) high-intense playing actions per match with a total effective playing time of 50.70 ± 5.83 minutes. On average, each player made 2.8 ± 2.6 fast breaks, gave 7.9 ± 14.4 screenings, received 14.6 ± 9.2 tackles in total, and performed 7.7 ± 3.7 shots while in offense, along with 3.5 ± 3.8 blockings, 1.9 ± 2.7 claspings, and 6.2 ± 3.8 hard tackles in defense. Mean body height, body mass, and age in the Danish Premier Female Team Handball League were 175.4 ± 6.1 cm, 69.5 ± 6.5 kg, and 25.4 ± 3.7 years, respectively. Wing players were lighter (63.5 ± 4.8 kg, p < 0.001) and smaller (169.3 ± 4.9 cm, p < 0.001) than backcourt players (BP) (70.6 ± 5.3 kg, 177.0 ± 5.4 cm) and pivots (PV) (72.5 ± 4.9 kg, 177.7 ± 4.9 cm). In conclusion, the present match observations revealed that female elite TH players during competitive games intermittently perform a high number of short-term, high-intense technical playing actions making modern female elite TH a physically demanding team sport. No sign of technical fatigue were observed, since the amount of intense technical playing actions remained unchanged in the second half. Marked positional differences in the physical demands were demonstrated, with wing players performing more fast breaks and less physical confrontations than BP and PV. Body anthropometry differed substantially between different playing positions. Consequently, this should lead to an increase in physical training in modern female elite TH directed at specific positions and individual physical capacity.

  5. 'Achieving ensemble': communication in orthopaedic surgical teams and the development of situation awareness--an observational study using live videotaped examples.

    PubMed

    Bleakley, Alan; Allard, Jon; Hobbs, Adrian

    2013-03-01

    Focused dialogue, as good communication between practitioners, offers a condition of possibility for development of high levels of situation awareness in surgical teams. This has been termed "achieving ensemble". Situation awareness grasps what is happening in time and space with regard to one's own unfolding work in relation to that of colleagues, and is necessary to maintain patient safety throughout a surgical list. We refined a typology, initially developed for use in studying the dynamics of teams in aviation safety, of 10 kinds of communication within two broad areas: 'Reports', or authoritative acts of communication setting up a monological or authoritative climate; and 'Requests', or facilitative acts of communication setting up a dialogical or participatory climate. We systematically mapped how orthopaedic surgical teams use verbal communication through analysis of videotaped operations using the typology. We asked: 'do orthopaedic surgical teams set up the conditions of possibility for the emergence of situation awareness through effective communication?' We found that orthopaedic surgical teams tend to produce monological rather than dialogical climates. Dialogue increases with more complex cases, but in routine work, communication levels are depressed and one-way, influenced by surgeons working within a traditionally hierarchical and authoritative culture. We suggest that such a monological climate inhibits development of situation awareness and then compromises patient safety. The same teams, however, generate potentially rich educational climates through exchange of profession-specific knowledge and skills, and we suggest that where technical skill exchange is good, non-technical or interpersonal communication skill levels can follow.

  6. Lean Participative Process Improvement: Outcomes and Obstacles in Trauma Orthopaedics

    PubMed Central

    New, Steve; Hadi, Mohammed; Pickering, Sharon; Robertson, Eleanor; Morgan, Lauren; Griffin, Damian; Collins, Gary; Rivero-Arias, Oliver; Catchpole, Ken; McCulloch, Peter

    2016-01-01

    Objectives To examine the effectiveness of a “systems” approach using Lean methodology to improve surgical care, as part of a programme of studies investigating possible synergy between improvement approaches. Setting A controlled before-after study using the orthopaedic trauma theatre of a UK Trust hospital as the active site and an elective orthopaedic theatre in the same Trust as control. Participants All staff involved in surgical procedures in both theatres. Interventions A one-day “lean” training course delivered by an experienced specialist team was followed by support and assistance in developing a 6 month improvement project. Clinical staff selected the subjects for improvement and designed the improvements. Outcome Measures We compared technical and non-technical team performance in theatre using WHO checklist compliance evaluation, “glitch count” and Oxford NOTECHS II in a sample of directly observed operations, and patient outcome (length of stay, complications and readmissions) for all patients. We collected observational data for 3 months and clinical data for 6 months before and after the intervention period. We compared changes in measures using 2-way analysis of variance. Results We studied 576 cases before and 465 after intervention, observing the operation in 38 and 41 cases respectively. We found no significant changes in team performance or patient outcome measures. The intervention theatre staff focused their efforts on improving first patient arrival time, which improved by 20 minutes after intervention. Conclusions This version of “lean” system improvement did not improve measured safety processes or outcomes. The study highlighted an important tension between promoting staff ownership and providing direction, which needs to be managed in “lean” projects. Space and time for staff to conduct improvement activities are important for success. PMID:27124012

  7. Qualitative Video Analysis of Track-Cycling Team Pursuit in World-Class Athletes.

    PubMed

    Sigrist, Samuel; Maier, Thomas; Faiss, Raphael

    2017-11-01

    Track-cycling team pursuit (TP) is a highly technical effort involving 4 athletes completing 4 km from a standing start, often in less than 240 s. Transitions between athletes leading the team are obviously of utmost importance. To perform qualitative video analyses of transitions of world-class athletes in TP competitions. Videos captured at 100 Hz were recorded for 77 races (including 96 different athletes) in 5 international track-cycling competitions (eg, UCI World Cups and World Championships) and analyzed for the 12 best teams in the UCI Track Cycling TP Olympic ranking. During TP, 1013 transitions were evaluated individually to extract quantitative (eg, average lead time, transition number, length, duration, height in the curve) and qualitative (quality of transition start, quality of return at the back of the team, distance between third and returning rider score) variables. Determination of correlation coefficients between extracted variables and end time allowed assessment of relationships between variables and relevance of the video analyses. Overall quality of transitions and end time were significantly correlated (r = .35, P = .002). Similarly, transition distance (r = .26, P = .02) and duration (r = .35, P = .002) were positively correlated with end time. Conversely, no relationship was observed between transition number, average lead time, or height reached in the curve and end time. Video analysis of TP races highlights the importance of quality transitions between riders, with preferably swift and short relays rather than longer lead times for faster race times.

  8. Why saying what you mean matters: An analysis of trauma team communication.

    PubMed

    Jung, Hee Soo; Warner-Hillard, Charles; Thompson, Ryan; Haines, Krista; Moungey, Brooke; LeGare, Anne; Shaffer, David Williamson; Pugh, Carla; Agarwal, Suresh; Sullivan, Sarah

    2018-02-01

    We hypothesized that team communication with unmatched grammatical form and communicative intent (mixed mode communication) would correlate with worse trauma teamwork. Interdisciplinary trauma simulations were conducted. Team performance was rated using the TEAM tool. Team communication was coded for grammatical form and communicative intent. The rate of mixed mode communication (MMC) was calculated. MMC rates were compared to overall TEAM scores. Statements with advisement intent (attempts to guide behavior) and edification intent (objective information) were specifically examined. The rates of MMC with advisement intent (aMMC) and edification intent (eMMC) were also compared to TEAM scores. TEAM scores did not correlate with MMC or eMMC. However, aMMC rates negatively correlated with total TEAM scores (r = -0.556, p = 0.025) and with the TEAM task management component scores (r = -0.513, p = 0.042). Trauma teams with lower rates of mixed mode communication with advisement intent had better non-technical skills as measured by TEAM. Copyright © 2017 Elsevier Inc. All rights reserved.

  9. American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance Federal Aviation Administration – Project 209 Control Tower and Support Building, Reno, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Arends, J.; Sandusky, William F.

    2010-06-30

    Pacific Northwest National Laboratory (PNNL) and Redhorse Corporation (Redhorse) conducted an energy audit on the Federal Aviation Administration (FAA) control tower and base building in Reno, Nevada. This report presents the findings of the energy audit team that evaluated construction documents and operating specifications (at the 100% level) and completed a site visit. The focus of the review was to identify measures that could be incorporated into the final design and operating specifications that would result in additional energy savings for the FAA that would not have otherwise occurred.

  10. Science Operations During Planetary Surface Exploration: Desert-RATS Tests 2009-2011

    NASA Technical Reports Server (NTRS)

    Cohen, Barbara

    2012-01-01

    NASA s Research and Technology Studies (RATS) team evaluates technology, human-robotic systems and extravehicular equipment for use in future human space exploration missions. Tests are conducted in simulated space environments, or analog tests, using prototype instruments, vehicles, and systems. NASA engineers, scientists and technicians from across the country gather annually with representatives from industry and academia to perform the tests. Test scenarios include future missions to near-Earth asteroids (NEA), the moon and Mars.. Mission simulations help determine system requirements for exploring distant locations while developing the technical skills required of the next generation of explorers.

  11. Sustainable Energy in Remote Indonesian Grids. Accelerating Project Development

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hirsch, Brian; Burman, Kari; Davidson, Carolyn

    2015-06-30

    Sustainable Energy for Remote Indonesian Grids (SERIG) is a U.S. Department of Energy (DOE) funded initiative to support Indonesia’s efforts to develop clean energy and increase access to electricity in remote locations throughout the country. With DOE support, the SERIG implementation team consists of the National Renewable Energy Laboratory (NREL) and Winrock International’s Jakarta, Indonesia office. Through technical assistance that includes techno-economic feasibility evaluation for selected projects, government-to-government coordination, infrastructure assessment, stakeholder outreach, and policy analysis, SERIG seeks to provide opportunities for individual project development and a collective framework for national replication office.

  12. Effectiveness of facilitated introduction of a standard operating procedure into routine processes in the operating theatre: a controlled interrupted time series.

    PubMed

    Morgan, Lauren; New, Steve; Robertson, Eleanor; Collins, Gary; Rivero-Arias, Oliver; Catchpole, Ken; Pickering, Sharon P; Hadi, Mohammed; Griffin, Damian; McCulloch, Peter

    2015-02-01

    Standard operating procedures (SOPs) should improve safety in the operating theatre, but controlled studies evaluating the effect of staff-led implementation are needed. In a controlled interrupted time series, we evaluated three team process measures (compliance with WHO surgical safety checklist, non-technical skills and technical performance) and three clinical outcome measures (length of hospital stay, complications and readmissions) before and after a 3-month staff-led development of SOPs. Process measures were evaluated by direct observation, using Oxford Non-Technical Skills II for non-technical skills and the 'glitch count' for technical performance. All staff in two orthopaedic operating theatres were trained in the principles of SOPs and then assisted to develop standardised procedures. Staff in a control operating theatre underwent the same observations but received no training. The change in difference between active and control groups was compared before and after the intervention using repeated measures analysis of variance. We observed 50 operations before and 55 after the intervention and analysed clinical data on 1022 and 861 operations, respectively. The staff chose to structure their efforts around revising the 'whiteboard' which documented and prompted tasks, rather than directly addressing specific task problems. Although staff preferred and sustained the new system, we found no significant differences in process or outcome measures before/after intervention in the active versus the control group. There was a secular trend towards worse outcomes in the postintervention period, seen in both active and control theatres. SOPs when developed and introduced by frontline staff do not necessarily improve operative processes or outcomes. The inherent tension in improvement work between giving staff ownership of improvement and maintaining control of direction needs to be managed, to ensure staff are engaged but invest energy in appropriate change. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://group.bmj.com/group/rights-licensing/permissions.

  13. Book Review: Space Research at the Technical University of Moldova.

    NASA Astrophysics Data System (ADS)

    Gaina, Alex

    Recently the historian of the Technical University of Moldova Aurel Marinchuk (Marinciuc) in a collaboration with the editorial team from the same University has published a Jubiliary Album "50 Years of the Technical University of Moldova". The Album is published at the Technical University in Chisinau (The Republic of Moldova). Two chapters of this album present major interest: 1) Space research at the Technical University of Moldova 2) The Foucault Pendulum manufactured at the same University under the supervision of the Rector of University, Dr. Hab. of Technical Sciences and Member of the Academy of Sciences of the Republic of Moldova Ion Bostan. The parameters of the Pendulums are: m=102 kg L=17,24 m T=8.35 sec. >From the first chapter We learn that 3 astronauts: Frank Lee Culbertson, Vladimir Dezhurov and Dumitru Dorin Prunariu are Doctors Honoris Causa of this University. As well we can found in the album informations about the Microsatellit "Republic of Moldova" built also by a team from the same University. It is ready to fly, but many depends on the funds for launch the Satellite. The Foucault Pendulum presents also interest in view of its possible applications to detect the influence of the relative position of the Sun and the Moon on Earthquakes. As is well known the tidal gravitational Force varies, depending on the relative position of the Sun and the Moon.

  14. Comparison of technical and physical activities between 8 vs. 8 and 11 vs. 11 games in young Korean soccer players.

    PubMed

    Oh, Seong Hwan; Joo, Chang Hwa

    2018-04-01

    The aims of this study were to examine the differences in technical aspects and physical demands between small-size games (SSG; 8 vs. 8) and regular-size games (RSG; 11 vs. 11) in young Korean soccer players. Seventy-nine young soccer players from 6 teams (U-12) volunteered to participate in the study. The players completed 4 games (2 SSG, 62×51 m, and 2 RSG, 80×54 m) in 2 days. Each game was filmed to evaluate technical actions. Physical demand variables were measured using global positioning system technology. SSG showed significantly greater numbers of technical plays among 17 variables when compared to RSG ( P <0.05). The players covered significantly greater total distance during low-, moderate-, and high-speed running and sprinting in SSG than in RSG ( P <0.05). Higher numbers of high-intensity activities (repeated high-intensity efforts, explosive efforts, decelera-tions, accelerations, and sprinting) were observed in SSG compared to RSG ( P <0.05). Mean heart rate was also higher in SSG than in RSG ( P <0.05). Despite the greater physical demands during SSG, the exercise intensity was similar to that reported in previous studies. Therefore, the SSG format applied in the present study can be a suitable official game format for Korean young soccer players, resulting in significantly greater exposure to technical plays without excessive physical demands.

  15. Light Duty Fuel Cell Electric Vehicle Validation Data. Final Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jelen, Deborah; Odom, Sara

    2015-04-30

    Electricore, along with partners from Quong & Associates, Inc., Honda R&D Americas (Honda), Nissan Technical Center North America (Nissan), and Toyota Motor Engineering & Manufacturing North America, Inc. (Toyota), participated in the Light Duty Fuel Cell Electric Vehicle (FCEV) Validation Data program sponsored by the Department of Energy (DOE) Office of Energy Efficiency and Renewable Energy (EERE) (Cooperative Agreement No. DE-EE0005968). The goal of this program was to provide real world data from the operation of past and current FCEVs, in order to measure their performance and improvements over time. The program was successful; 85% of the data fields requestedmore » were provided and not restricted due to proprietary reasons. Overall, the team from Electricore provided at least 4.8 GB of data to DOE, which was combined with data from other participants to produce over 33 key data products. These products included vehicle performance and fuel cell stack performance/durability. The data were submitted to the National Renewable Energy Laboratory’s National Fuel Cell Technology Evaluation Center (NREL NFCTEC) and combined with input from other participants. NREL then produced composite data products (CDP) which anonymized the data in order to maintain confidentiality. The results were compared with past data, which showed a measurable improvement in FCEVs over the past several years. The results were presented by NREL at the 2014 Fuel Cell Seminar, and 2014 and 2015 (planned) DOE Annual Merit Review. The project was successful. The team provided all of the data agreed upon and met all of its goals. The project finished on time and within budget. In addition, an extra $62,911 of cost sharing was provided by the Electricore team. All participants believed that the method used to collect, combine, anonymize, and present the data was technically and economically effective. This project helped EERE meet its mission of ensuring America’s security and prosperity by documenting progress in addressing energy and environmental challenges. Information from this project will be used by the hydrogen and vehicle industries to help advance the introduction of FCEVs and associated hydrogen infrastructure.« less

  16. Differential Impacts of Intensive District-Level Technical Assistance on Student Achievement: A Study of California's District Assistance and Intervention Teams

    ERIC Educational Resources Information Center

    Strunk, Katharine O.; McEachin, Andrew

    2012-01-01

    Building on Strunk, McEachin, and Westover (2011), the authors examine whether or not District Assistance and Intervention Teams (DAITs) have a differential impact on student performance across school and student characteristics. They use a quasi-experimental design to examine the impacts of DAITs on student achievement on math and English…

  17. Deploying Electric Vehicles and Electric Vehicle Supply Equipment: Tiger Teams Offer Project Assistance for Federal Fleets

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    To assist federal agencies with the transition to plug-in electric vehicles (PEVs), including battery electric vehicles (BEVs) and plug-in hybrid electric vehicles (PHEVs), FEMP offers technical guidance on electric vehicle supply equipment (EVSE) installations and site-specific planning through partnerships with the National Renewable Energy Laboratory’s EVSE Tiger Teams.

  18. Improving Cybersecurity Incident Response Team (CSIRT) Skills, Dynamics and Effectiveness

    DTIC Science & Technology

    2017-03-01

    recommendations for optimal CSIRT performance. 15. SUBJECT TERMS Cyber Incident Response, Response Teams, Cognitive Task Analysis 16. SECURITY...conducted a study of the cognitive , social, personality, and motivational requirements involved in cybersecurity incident response and then validated...corporate CSIRTs, and academic institution CSIRTs. • Survey of Non-Technical KSAOs. Previous known studies of CSIRTs did not examine cognitive , social, and

  19. Enhancing Intercultural Competence of Engineering Students via GVT (Global Virtual Teams)-Based Virtual Exchanges: An International Collaborative Course in Intralogistics Education

    ERIC Educational Resources Information Center

    Wang, Rui; Rechl, Friederike; Bigontina, Sonja; Fang, Dianjun; Günthner, Willibald A.; Fottner, Johannes

    2017-01-01

    In order to enhance the intercultural competence of engineering students, an international collaborative course in intralogistics education was initiated and realized between the Technical University of Munich in Germany and the Tongji University in China. In this course, students worked in global virtual teams (GVTs) and solved a concrete case…

  20. Automated Program Analysis for Cybersecurity (APAC)

    DTIC Science & Technology

    2016-07-14

    AUTOMATED PROGRAM ANALYSIS FOR CYBERSECURITY (APAC) FIVE DIRECTIONS, INC JULY 2016 FINAL TECHNICAL REPORT APPROVED... CYBERSECURITY (APAC) 5a. CONTRACT NUMBER FA8750-14-C-0050 5b. GRANT NUMBER N/A 5c. PROGRAM ELEMENT NUMBER 61101E 6. AUTHOR(S) William Arbaugh...AC Team Adversarial Challenge Team, responsible for creating malicious applications APAC Automated Program Analysis for Cybersecurity BAE BAE Systems

  1. 164. HISTORIC AMERICAN ENGINEERING RECORD SUMMER RECORDING TEAM, 1992. LEFT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    164. HISTORIC AMERICAN ENGINEERING RECORD SUMMER RECORDING TEAM, 1992. LEFT TO RIGHT: JOE ELLIOTT, PHOTOGRAPHER; VIRGINIA BRUMBACK, ARCHITECT; DAVE EVE, HISTORIAN (ICOMOS, IRONBRIDGE INSTITUTE, ENGLAND); BOB ARZYWACZ, PROJECT SUPERVISOR; LEE ANN JACKSON, ARCHITECT; AND ALBERT AFLENZER, ICOMOS ARCHITECT (TECHNICAL UNIVERSITY, VIENNA, AUSTRIA). - Bald Mountain Gold Mill, Nevada Gulch at head of False Bottom Creek, Lead, Lawrence County, SD

  2. Team-Based Peer Review as a Form of Formative Assessment--The Case of a Systems Analysis and Design Workshop

    ERIC Educational Resources Information Center

    Lavy, Ilana; Yadin, Aharon

    2010-01-01

    The present study was carried out within a systems analysis and design workshop. In addition to the standard analysis and design tasks, this workshop included practices designed to enhance student capabilities related to non-technical knowledge areas, such as critical thinking, interpersonal and team skills, and business understanding. Each task…

  3. Quantification of physiological, movement, and technical outputs during a novel small-sided game in young team sport athletes.

    PubMed

    Harrison, Craig B; Gill, Nicholas D; Kinugasa, Taisuke; Kilding, Andrew E

    2013-10-01

    The aim of this study was to quantify the physiological responses, time-motion characteristics, and technical executions associated with a novel non-sport-specific small-sided game (SSG) in young team sport players. On 6 separate occasions, 12 young male team sport athletes (mean ± SD: age, 13.0 ± 0.3 years; height, 157.4 ± 4.9 cm; body mass, 47.0 ± 5.0 kg; and V[Combining Dot Above]O2peak, 55.1 ± 4.6 ml·kg·min) completed various "bucketball" SSG formats (i.e., 3 vs. 3, 4 vs. 4, and 6 vs. 6) twice each. Heart rate (HR) was measured during each SSG at 5-second intervals. Time-motion characteristics were measured using global positioning systems. Ratings of perceived exertion (RPEs) were recorded immediately after the SSGs using the Borg scale (RPEs, 6-20). Technical skill executions were measured using a high-speed digital video camera. Analysis revealed a tendency for the 3 vs. 3 games to elicit higher HRs (88.3 ± 4.3) than either 4 vs. 4 (85.9 ± 4.9) or 6 vs. 6 formats (85.9 ± 3.2). Total distance traveled at 13-17.9 km·h was more during 6 vs. 6 than 3 vs. 3 games (very likely substantial true difference, 97%), and total possessions and number of catches, passes, and shots were all higher in 3 vs. 3 compared with 4 vs. 4 and 6 vs. 6 games. There was no difference in RPE between the game formats. The results of this study indicate that 3 vs. 3 non-sport-specific SSGs provide higher stimulus for aerobic fitness adaptation and technical improvement than 4 vs. 4 and 6 vs. 6 formats, and their use for training young team sport athletes is recommended.

  4. Joint Assessment of Renewable Energy and Water Desalination Research Center (REWDC) Program Capabilities and Facilities In Radioactive Waste Management

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bissani, M; Fischer, R; Kidd, S

    2006-04-03

    The primary goal of this visit was to perform a joint assessment of the Renewable Energy and Water Desalination Center's (REWDC) program in radioactive waste management. The visit represented the fourth technical and scientific interaction with Libya under the DOE/NNSA Sister Laboratory Arrangement. Specific topics addressed during the visit focused on Action Sheet P-05-5, ''Radioactive Waste Management''. The Team, comprised of Mo Bissani (Team Lead), Robert Fischer, Scott Kidd, and Jim Merrigan, consulted with REWDC management and staff. The team collected information, discussed particulars of the technical collaboration and toured the Tajura facility. The tour included the waste treatment facility,more » waste storage/disposal facility, research reactor facility, hot cells and analytical labs. The assessment team conducted the first phase of Task A for Action Sheet 5, which involved a joint assessment of the Radioactive Waste Management Program. The assessment included review of the facilities dedicated to the management of radioactive waste at the Tourja site, the waste management practices, proposed projects for the facility and potential impacts on waste generation and management.« less

  5. Advancing Next-Generation Energy in Indian Country (Fact Sheet)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    2012-08-01

    This fact sheet provides information on Tribes in the lower 48 states selected to receive assistance from the Strategic Technical Assistance Response Team (START) Program, a U.S. Department of Energy Office of Indian Energy Policy and Programs (DOE-IE) initiative to provide technical expertise to support the development of next-generation energy projects in Indian Country.

  6. Advancing Next-Generation Energy in Indian Country (Fact Sheet)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    2012-08-01

    This fact sheet provides information on the Alaska Native governments selected to receive assistance from the Strategic Technical Assistance Response Team (START) Program, a U.S. Department of Energy Office of Indian Energy Policy and Programs (DOE-IE) initiative to provide technical expertise to support the development of next-generation energy projects in Indian Country.

  7. Instructional Design in Technical Areas. Australian Education Review, No. 43.

    ERIC Educational Resources Information Center

    Sweller, John

    This book details the findings from a research team that used cognitive principles and a large range of experiments to devise a variety of instructional designs. Their recommendations are based on 20 years of objective, published research. Although the program focused on technical subjects, the findings can easily be applied to a range of…

  8. Improving the U.S. Navy’s Execution of Technical Authority through a Common Risk Management and Technical Assessment Process

    DTIC Science & Technology

    2008-09-01

    ITP . Assessment Indicators: • Has the risk management team (RMT) provided a risk management plan (RMP)? − Does the RMP provide an organized...processes. Diskettes, which contain the necessary programs for accessing BMP◊NET from IBM -compatible or Macintosh computers with a modem, and answers to

  9. The Applicability of the ISD 4-Factor Model of Job Analysis in Identifying Task Training Priority in Nine Technical Military Occupational Specialties.

    ERIC Educational Resources Information Center

    Siebold, Guy L.

    Research was conducted to assess the applicability of the Instructional Systems Development (ISD) job analysis procedures to nine technical aviation maintenance military occupational specialties (MOS). Job analysis questionnaires were developed for each of the nine aviation maintenance MOS's. Research teams administered the questionnaires to…

  10. A simple video-based timing system for on-ice team testing in ice hockey: a technical report.

    PubMed

    Larson, David P; Noonan, Benjamin C

    2014-09-01

    The purpose of this study was to describe and evaluate a newly developed on-ice timing system for team evaluation in the sport of ice hockey. We hypothesized that this new, simple, inexpensive, timing system would prove to be highly accurate and reliable. Six adult subjects (age 30.4 ± 6.2 years) performed on ice tests of acceleration and conditioning. The performance times of the subjects were recorded using a handheld stopwatch, photocell, and high-speed (240 frames per second) video. These results were then compared to allow for accuracy calculations of the stopwatch and video as compared with filtered photocell timing that was used as the "gold standard." Accuracy was evaluated using maximal differences, typical error/coefficient of variation (CV), and intraclass correlation coefficients (ICCs) between the timing methods. The reliability of the video method was evaluated using the same variables in a test-retest analysis both within and between evaluators. The video timing method proved to be both highly accurate (ICC: 0.96-0.99 and CV: 0.1-0.6% as compared with the photocell method) and reliable (ICC and CV within and between evaluators: 0.99 and 0.08%, respectively). This video-based timing method provides a very rapid means of collecting a high volume of very accurate and reliable on-ice measures of skating speed and conditioning, and can easily be adapted to other testing surfaces and parameters.

  11. Weapons team engagement trainer: a transfer of high-tech military training technology to the law enforcement community

    NASA Astrophysics Data System (ADS)

    Franz, Thomas M.; Gonos, Greg; Simek, Lisa

    1999-01-01

    Six years ago at SPIE, a team of government researchers and engineers unveiled a new, military, weapons team engagement trainer (WTET). At that time, potential applications of this prototype military training device to civilian law enforcement training were realized. Subsequent action was taken under the Federal Technology Transfer Act of 1986, enabling the transfer of WTET to the private sector, through a cooperative agreement between: the Office of Naval Research (ONR), NAWCTSD, and the commercial weapons training organization Firearms Training Systems, Inc. (FATS). Planning also began for release of a commercial WTET sytem. The government research and development facility and the National Institute of Justice (NIJ) formed a cooperative agreement to make the prototype system available to military, federal, and local law enforcement agencies for use in Orlando, Florida - until a commercial version could become available. This cooperative effort has provided evidence of the effectiveness and realism of WTET with law enforcement personnel. This paper offers a technical description of the improvements made to WTET, a brief explanation of the commercialization process, a summary of the evaluations conducted to date, and insight into how that information has been used in the development of the commercial version.

  12. Assessment of Options for the Treatment of Nitrate Salt Wastes at Los Alamos National Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Robinson, Bruce Alan; Funk, David John; Stevens, Patrice Ann

    2016-03-17

    This paper summarizes the methodology used to evaluate options for treatment of the remediated nitrate salt waste containers at Los Alamos National Laboratory. The method selected must enable treatment of the waste drums, which consist of a mixture of complex nitrate salts (oxidizer) improperly mixed with sWheat Scoop®1, an organic kitty litter and absorbent (fuel), in a manner that renders the waste safe, meets the specifications of waste acceptance criteria, and is suitable for transport and final disposal in the Waste Isolation Pilot Plant located in Carlsbad, New Mexico. A Core Remediation Team was responsible for comprehensively reviewing the options,more » ensuring a robust, defensible treatment recommendation. The evaluation process consisted of two steps. First, a prescreening process was conducted to cull the list on the basis for a decision of feasibility of certain potential options with respect to the criteria. Then, the remaining potential options were evaluated and ranked against each of the criteria in a consistent methodology. Numerical scores were established by consensus of the review team. Finally, recommendations were developed based on current information and understanding of the scientific, technical, and regulatory situation. A discussion of the preferred options and documentation of the process used to reach the recommended treatment options are presented.« less

  13. Maintaining High Quality Data and Consistency Across a Diverse Flux Network: The Ameriflux QA/QC Technical Team

    NASA Astrophysics Data System (ADS)

    Chan, S.; Billesbach, D. P.; Hanson, C. V.; Biraud, S.

    2014-12-01

    The AmeriFlux quality assurance and quality control (QA/QC) technical team conducts short term (<2 weeks) intercomparisons using a portable eddy covariance system (PECS) to maintain high quality data observations and data consistency across the AmeriFlux network (http://ameriflux.lbl.gov/). Site intercomparisons identify discrepancies between the in situ and portable measurements and calculated fluxes. Findings are jointly discussed by the site staff and the QA/QC team to improve in the situ observations. Despite the relatively short duration of an individual site intercomparison, the accumulated record of all site visits (numbering over 100 since 2002) is a unique dataset. The ability to deploy redundant sensors provides a rare opportunity to identify, quantify, and understand uncertainties in eddy covariance and ancillary measurements. We present a few specific case studies from QA/QC site visits to highlight and share new and relevant findings related to eddy covariance instrumentation and operation.

  14. STTR Phase 1 Final Technical Report for Project Entitled "Developing a Mobile Torrefaction Machine"

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    James, Joseph J.

    The goal of this project, sponsored by Agri-Tech Producers, LLC (ATP), the small business grantee, was to determine if the torrefaction technology, developed by North Carolina State University (NCSU), which ATP has licensed, could be feasibly deployed in a mobile unit. The study adds to the area investigated, by having ATP’s STTR Phase I team give thoughtful consideration to how to use NCSU’s technology in a mobile unit. The findings by ATP’s team were that NCSU’s technology would best perform in units 30’ by 80’ (See Spec Sheet for the Torre-Tech 5.0 Unit in the Appendix) and the technical effectivenessmore » and economic feasibility investigation suggested that such units were not easily, efficiently or safely utilized in a forest or farm setting. (Note rendering of possible mobile system in the Appendix) Therefore, the findings by ATP’s team were that NCSU’s technology could not feasibly be deployed as a mobile unit.« less

  15. Computational Fluid Dynamics Based Investigation of Sensitivity of Furnace Operational Conditions to Burner Flow Controls

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Marc Cremer; Kirsi St. Marie; Dave Wang

    2003-04-30

    This is the first Semiannual Technical Report for DOE Cooperative Agreement No: DE-FC26-02NT41580. The goal of this project is to systematically assess the sensitivity of furnace operational conditions to burner air and fuel flows in coal fired utility boilers. Our approach is to utilize existing baseline furnace models that have been constructed using Reaction Engineering International's (REI) computational fluid dynamics (CFD) software. Using CFD analyses provides the ability to carry out a carefully controlled virtual experiment to characterize the sensitivity of NOx emissions, unburned carbon (UBC), furnace exit CO (FECO), furnace exit temperature (FEGT), and waterwall deposition to burner flowmore » controls. The Electric Power Research Institute (EPRI) is providing co-funding for this program, and instrument and controls experts from EPRI's Instrument and Controls (I&C) Center are active participants in this project. This program contains multiple tasks and good progress is being made on all fronts. A project kickoff meeting was held in conjunction with NETL's 2002 Sensors and Control Program Portfolio Review and Roadmapping Workshop, in Pittsburgh, PA during October 15-16, 2002. Dr. Marc Cremer, REI, and Dr. Paul Wolff, EPRI I&C, both attended and met with the project COR, Susan Maley. Following the review of REI's database of wall-fired coal units, the project team selected a front wall fired 150 MW unit with a Riley Low NOx firing system including overfire air for evaluation. In addition, a test matrix outlining approximately 25 simulations involving variations in burner secondary air flows, and coal and primary air flows was constructed. During the reporting period, twenty-two simulations have been completed, summarized, and tabulated for sensitivity analysis. Based on these results, the team is developing a suitable approach for quantifying the sensitivity coefficients associated with the parametric tests. Some of the results of the CFD simulations of the single wall fired unit were presented in a technical paper entitled, ''CFD Investigation of the Sensitivity of Furnace Operational Conditions to Burner Flow Controls,'' presented at the 28th International Technical Conference on Coal Utilization and Fuel Systems in Clearwater, FL March 9-14, 2003. In addition to the work completed on the single wall fired unit, the project team made the selection of a 580 MW opposed wall fired unit to be the subject of evaluation in this program. Work is in progress to update the baseline model of this unit so that the parametric simulations can be initiated.« less

  16. Evaluation of the MICAST #2-12 AI-7wt%Si Sample Directionally Solidified Aboard the International Space Station

    NASA Technical Reports Server (NTRS)

    Tewari, Surendra N.; Ghods, Masoud; Angart, Samuel G.; Lauer, Mark; Grugel, Richard N.; Poirier, David R.

    2016-01-01

    The US team of the European led "MIcrostructure Formation in CASTing of Technical Alloys under Diffusive and Magnetically Controlled Convective Conditions" (MICAST) program recently received a third Aluminum - 7wt% silicon alloy that was processed in the microgravity environment aboard the International Space Station. The sample, designated MICAST#2-12, was directionally solidified in the Solidification with Quench Furnace (SQF) at a constant rate of 40micometers/s through an imposed temperature gradient of 31K/cm. Procedures taken to evaluate the state of the sample prior to sectioning for metallographic analysis are reviewed and rational for measuring the microstructural constituents, in particular the primary dendrite arm spacing (Lambda (sub1)), is given. The data are presented, put in context with the earlier samples, and evaluated in view of a relevant theoretical model.

  17. Learning curves for transapical transcatheter aortic valve replacement in the PARTNER-I trial: Technical performance, success, and safety.

    PubMed

    Suri, Rakesh M; Minha, Sa'ar; Alli, Oluseun; Waksman, Ron; Rihal, Charanjit S; Satler, Lowell P; Greason, Kevin L; Torguson, Rebecca; Pichard, Augusto D; Mack, Michael; Svensson, Lars G; Rajeswaran, Jeevanantham; Lowry, Ashley M; Ehrlinger, John; Mick, Stephanie L; Tuzcu, E Murat; Thourani, Vinod H; Makkar, Raj; Holmes, David; Leon, Martin B; Blackstone, Eugene H

    2016-09-01

    Introduction of hybrid techniques, such as transapical transcatheter aortic valve replacement (TA-TAVR), requires skills that a heart team must master to achieve technical efficiency: the technical performance learning curve. To date, the learning curve for TA-TAVR remains unknown. We therefore evaluated the rate at which technical performance improved, assessed change in occurrence of adverse events in relation to technical performance, and determined whether adverse events after TA-TAVR were linked to acquiring technical performance efficiency (the learning curve). From April 2007 to February 2012, 1100 patients, average age 85.0 ± 6.4 years, underwent TA-TAVR in the PARTNER-I trial. Learning curves were defined by institution-specific patient sequence number using nonlinear mixed modeling. Mean procedure time decreased from 131 to 116 minutes within 30 cases (P = .06) and device success increased to 90% by case 45 (P = .0007). Within 30 days, 354 patients experienced a major adverse event (stroke in 29, death in 96), with possibly decreased complications over time (P ∼ .08). Although longer procedure time was associated with more adverse events (P < .0001), these events were associated with change in patient risk profile, not the technical performance learning curve (P = .8). The learning curve for TA-TAVR was 30 to 45 procedures performed, and technical efficiency was achieved without compromising patient safety. Although fewer patients are now undergoing TAVR via nontransfemoral access, understanding TA-TAVR learning curves and their relationship with outcomes is important as the field moves toward next-generation devices, such as those to replace the mitral valve, delivered via the left ventricular apex. Copyright © 2016 The American Association for Thoracic Surgery. Published by Elsevier Inc. All rights reserved.

  18. Real-time monitoring for detection of retained surgical sponges and team motion in the surgical operation room using radio-frequency-identification (RFID) technology: a preclinical evaluation.

    PubMed

    Kranzfelder, Michael; Zywitza, Dorit; Jell, Thomas; Schneider, Armin; Gillen, Sonja; Friess, Helmut; Feussner, Hubertus

    2012-06-15

    Technical progress in the surgical operating room (OR) increases constantly, facilitating the development of intelligent OR systems functioning as "safety backup" in the background of surgery. Precondition is comprehensive data retrieval to identify imminent risky situations and inaugurate adequate security mechanisms. Radio-frequency-identification (RFID) technology may have the potential to meet these demands. We set up a pilot study investigating feasibility and appliance reliability of a stationary RFID system for real-time surgical sponge monitoring (passive tagged sponges, position monitoring: mayo-stand/abdominal situs/waste bucket) and OR team tracking (active transponders, position monitoring: right/left side of OR table). In vitro: 20/20 sponges (100%) were detected on the mayo-stand and within the OR-phantom, however, real-time detection accuracy declined to 7/20 (33%) when the tags were moved simultaneously. All retained sponges were detected correctly. In vivo (animal): 7-10/10 sterilized sponges (70%-100%) were detected correctly within the abdominal cavity. OR-team: detection accuracy within the OR (surveillance antenna) and on both sides of the OR table (sector antenna) was 100%. Mean detection time for position change (left to right side and contrariwise) was 30-60 s. No transponder failure was noted. This is the first combined RFID system that has been developed for stationary use in the surgical OR. Preclinical evaluation revealed a reliable sponge tracking and correct detection of retained textiles (passive RFID) but also demonstrated feasibility of comprehensive data acquisition of team motion (active RFID). However, detection accuracy needs to be further improved before implementation into the surgical OR. Copyright © 2012 Elsevier Inc. All rights reserved.

  19. Solar technical assistance provided to Forest City military communities in Hawaii for incorporation of 20-30 MW of solar energy generation to power family housing for US Navy personnel.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dominick, Jeff; Merrigan, Tim; Boudra, Will

    2010-06-01

    In May 2007, Forest City Military Communities won a US Department of Energy Solar America Showcase Award. As part of this award, executives and staff from Forest City Military Communities worked side-by-side with a DOE technical assistance team to overcome technical obstacles encountered by this large-scale real estate developer and manager. This paper describes the solar technical assistance that was provided and the key solar experiences acquired by Forest City Military Communities over an 18 month period.

  20. Learning by viewing versus learning by doing: A comparative study of observer and participant experiences during an interprofessional simulation training.

    PubMed

    Reime, Marit Hegg; Johnsgaard, Tone; Kvam, Fred Ivan; Aarflot, Morten; Engeberg, Janecke Merethe; Breivik, Marit; Brattebø, Guttorm

    2017-01-01

    Larger student groups and pressure on limited faculty time have raised the question of the learning value of merely observing simulation training in emergency medicine, instead of active team participation. The purpose of this study was to examine observers and hands-on participants' self-reported learning outcomes during simulation-based interprofessional team training regarding non-technical skills. In addition, we compared the learning outcomes for different professions and investigated team performance relative to the number of simulations in which they participated. A concurrent mixed-method design was chosen to evaluate the study, using questionnaires, observations, and focus group interviews. Participants included a total of 262 postgraduate and bachelor nursing students and medical students, organised into 44 interprofessional teams. The quantitative data showed that observers and participants had similar results in three of six predefined learning outcomes. The qualitative data emphasised the importance of participating in different roles, training several times, and training interprofessionally to enhance realism. Observing simulation training can be a valuable learning experience, but the students' preferred hands-on participation and learning by doing. For this reason, one can legitimise the observer role, given the large student groups and limited faculty time, as long as the students are also given some opportunity for hands-on participation in order to become more confident in their professional roles.

  1. Advanced Risk Reduction Tool (ARRT) Special Case Study Report: Science and Engineering Technical Assessments (SETA) Program

    NASA Technical Reports Server (NTRS)

    Kirsch, Paul J.; Hayes, Jane; Zelinski, Lillian

    2000-01-01

    This special case study report presents the Science and Engineering Technical Assessments (SETA) team's findings for exploring the correlation between the underlying models of Advanced Risk Reduction Tool (ARRT) relative to how it identifies, estimates, and integrates Independent Verification & Validation (IV&V) activities. The special case study was conducted under the provisions of SETA Contract Task Order (CTO) 15 and the approved technical approach documented in the CTO-15 Modification #1 Task Project Plan.

  2. ECLSS medical support activities

    NASA Technical Reports Server (NTRS)

    Crump, William J.; Kilgore, Melvin V., Jr.

    1991-01-01

    During the period from April 10, 1990 to April 9, 1991, the Consortium for the Space Life Sciences provided technical assistance to the NASA/MSFC water recovery efforts. This assistance was in the form of literature reviews, technical recommendations, and presentations. This final report summarizes the activities completed during this period and identifies those areas requiring additional efforts. The tasks which the University of Alabama in Huntsville (UAH) water recovery team addressed were either identified by MSFC technical representatives or chosen from those outlined in the subject statement of work.

  3. Human Factors in Training - Space Flight Resource Management Training

    NASA Technical Reports Server (NTRS)

    Bryne, Vicky; Connell, Erin; Barshi, Immanuel; Arsintescu, L.

    2009-01-01

    Accidents and incidents show that high workload-induced stress and poor teamwork skills lead to performance decrements and errors. Research on teamwork shows that effective teams are able to adapt to stressful situations, and to reduce workload by using successful strategies for communication and decision making, and through dynamic redistribution of tasks among team members. Furthermore, superior teams are able to recognize signs and symptoms of workload-induced stress early, and to adapt their coordination and communication strategies to the high workload, or stress conditions. Mission Control Center (MCC) teams often face demanding situations in which they must operate as an effective team to solve problems with crew and vehicle during onorbit operations. To be successful as a team, flight controllers (FCers) must learn effective teamwork strategies. Such strategies are the focus of Space Flight Resource Management (SFRM) training. SFRM training in MOD has been structured to include some classroom presentations of basic concepts and case studies, with the assumption that skill development happens in mission simulation. Integrated mission simulations do provide excellent opportunities for FCers to practice teamwork, but also require extensive technical knowledge of vehicle systems, mission operations, and crew actions. Such technical knowledge requires lengthy training. When SFRM training is relegated to integrated simulations, FCers can only practice SFRM after they have already mastered the technical knowledge necessary for these simulations. Given the centrality of teamwork to the success of MCC, holding SFRM training till late in the flow is inefficient. But to be able to train SFRM earlier in the flow, the training cannot rely on extensive mission-specific technical knowledge. Hence, the need for a generic SFRM training framework that would allow FCers to develop basic teamwork skills which are mission relevant, but without the required mission knowledge. Work on SFRM training has been conducted in collaboration with the Expedition Vehicle Division at the Mission Operations Directorate (MOD) and with United Space Alliance (USA) which provides training to Flight Controllers. The space flight resource management training work is part of the Human Factors in Training Directed Research Project (DRP) of the Space Human Factors Engineering (SHFE) Project under the Space Human Factors and Habitability (SHFH) Element of the Human Research Program (HRP). Human factors researchers at the Ames Research Center have been investigating team work and distributed decision making processes to develop a generic SFRM training framework for flight controllers. The work proposed for FY10 continues to build on this strong collaboration with MOD and the USA Training Group as well as previous research in relevant domains such as aviation. In FY10, the work focuses on documenting and analyzing problem solving strategies and decision making processes used in MCC by experienced FCers.

  4. 2014 NASA Centennial Challenges Sample Return Robot Challenge

    NASA Image and Video Library

    2014-06-14

    The NASA Centennial Challenges prize, level one, is presented to team Mountaineers for successfully completing level one of the NASA 2014 Sample Return Robot Challenge, from left, Ken Stafford, WPI Challenge technical advisor; Colleen Shaver, WPI Challenge Manager; Ryan Watson, Team Mountaineers; Marvin Cheng, Team Mountaineers; Alexander Hypes, Team Mountaineers; Jarred Strader, Team Mountaineers; Lucas Behrens, Team Mountaineers; Yu Gu, Team Mountaineers; Nick Ohi, Team Mountaineers; Dorothy Rasco, NASA Deputy Associate Administrator for the Space Technology Mission Directorate; Scott Harper, Team Mountaineers; Tanmay Mandal, Team Mountaineers; David Miller, NASA Chief Technologist; Sam Ortega, NASA Program Manager for Centennial Challenges, Saturday, June 14, 2014, at Worcester Polytechnic Institute (WPI) in Worcester, Mass. Team Mountaineers was the only team to complete the level one challenge. During the competition, teams were required to demonstrate autonomous robots that can locate and collect samples from a wide and varied terrain, operating without human control. The objective of this NASA-WPI Centennial Challenge was to encourage innovations in autonomous navigation and robotics technologies. Innovations stemming from the challenge may improve NASA's capability to explore a variety of destinations in space, as well as enhance the nation's robotic technology for use in industries and applications on Earth. Photo Credit: (NASA/Joel Kowsky)

  5. Impact of clinical leadership in teams’ course on quality, efficiency, responsiveness and trust in the emergency department: study protocol of a trailing research study

    PubMed Central

    Husebø, Sissel Eikeland; Olsen, Øystein Evjen

    2016-01-01

    Introduction Clinical leadership has long been recognised as critical for optimising patient safety, quality of care and interprofessional teamwork in busy and stressful healthcare settings. There is a need to compensate for the absence of the conventional mentor-to-apprentice transfer of clinical leadership knowledge and skills. While young doctors and nurses are increasingly proficient in medical, surgical and technical skills, their training in, and knowledge of clinical leadership skills, is not adequate to meet the demands for these non-technical skills in the emergency department. Thus, the purpose of the paper is to present and discuss the study protocol of clinical leadership in a course for teams that aims to improve quality, efficiency, responsiveness of healthcare services and collegial trust in the emergency department. Methods and analysis The study employs a trailing research design using multiple quantitative and qualitative methods in the summative (pretest and post-test) and formative evaluation. Quantitative data have been collected from a patient questionnaire, the emergency departments’ database and by the observation of team performance. Qualitative data have been collected by shadowing healthcare professionals and through focus group interviews. To ensure trustworthiness in the data analysis, we will apply member checks and analyst triangulation, in addition to providing contextual and sample description to allow for evaluation of transferability of our results to other contexts and groups. Ethics and dissemination The study is approved by the ethics committee of the western part of Norway and the hospital. The study is based on voluntary participation and informed written consent. Informants can withdraw at any point in time. The results will be disseminated at research conferences, peer review journals and through public presentations to people outside the scientific community. PMID:27515758

  6. Advanced composite fuselage technology

    NASA Technical Reports Server (NTRS)

    Ilcewicz, Larry B.; Smith, Peter J.; Horton, Ray E.

    1993-01-01

    Boeing's ATCAS program has completed its third year and continues to progress towards a goal to demonstrate composite fuselage technology with cost and weight advantages over aluminum. Work on this program is performed by an integrated team that includes several groups within The Boeing Company, industrial and university subcontractors, and technical support from NASA. During the course of the program, the ATCAS team has continued to perform a critical review of composite developments by recognizing advances in metal fuselage technology. Despite recent material, structural design, and manufacturing advancements for metals, polymeric matrix composite designs studied in ATCAS still project significant cost and weight advantages for future applications. A critical path to demonstrating technology readiness for composite transport fuselage structures was created to summarize ATCAS tasks for Phases A, B, and C. This includes a global schedule and list of technical issues which will be addressed throughout the course of studies. Work performed in ATCAS since the last ACT conference is also summarized. Most activities relate to crown quadrant manufacturing scaleup and performance verification. The former was highlighted by fabricating a curved, 7 ft. by 10 ft. panel, with cocured hat-stiffeners and cobonded J-frames. In building to this scale, process developments were achieved for tow-placed skins, drape formed stiffeners, braided/RTM frames, and panel cure tooling. Over 700 tests and supporting analyses have been performed for crown material and design evaluation, including structural tests that demonstrated limit load requirements for severed stiffener/skin failsafe damage conditions. Analysis of tests for tow-placed hybrid laminates with large damage indicates a tensile fracture toughness that is higher than that observed for advanced aluminum alloys. Additional recent ATCAS achievements include crown supporting technology, keel quadrant design evaluation, and sandwich process development.

  7. Body language in health care: a contribution to nursing communication.

    PubMed

    de Rezende, Rachel de Carvalho; de Oliveira, Rosane Mara Pontes; de Araújo, Sílvia Teresa Carvalho; Guimarães, Tereza Cristina Felippe; do Espírito Santo, Fátima Helena; Porto, Isaura Setenta

    2015-01-01

    to classify body language used in nursing care, and propose "Body language in nursing care" as an analytical category for nursing communication. quantitative research with the systematic observation of 21:43 care situations, with 21 members representing the nursing teams of two hospitals. Empirical categories: sound, facial, eye and body expressions. sound expressions emphasized laughter. Facial expressions communicated satisfaction and happiness. Eye contact with members stood out in visual expressions. The most frequent body expressions were head movements and indistinct touches. nursing care team members use body language to establish rapport with patients, clarify their needs and plan care. The study classified body language characteristics of humanized care, which involves, in addition to technical, non-technical issues arising from nursing communication.

  8. KSC-03pd0272

    NASA Image and Video Library

    2003-02-05

    KENNEDY SPACE CENTER, FLA. - Don Maxwell, Safety, United Space Alliance, checks a map of Texas during a meeting of the Recovery Management Team at KSC. The team is part of the investigation into the accident that claimed orbiter Columbia and her crew of seven on Feb. 1, 2003, over East Texas as they returned to Earth after a 16-day research mission. Other team members are Russ DeLoach, chief, Shuttle Mission Assurance Branch, NASA; George Jacobs, Shuttle Engineering; Jeff Campbell, Shuttle Engineering; Dave Rainer, Launch and Landing Operations; the two co-chairs of the Response Management Team, Denny Gagen, Landing Recovery Manager, Chris Hasselbring, Landing Operations, USA; and Larry Ulmer, Safety, NASA. The team is coordinating KSC technical support and assets to the Mishap Investigation Team in Barksdale, La., and providing support for the Recovery teams in Los Angeles, Texas, New Mexico, Arizona and California. In addition, the team is following up on local leads pertaining to potential debris in the KSC area. .

  9. Analysis of the Response Speed of Musculature of the Knee in Professional Male and Female Volleyball Players

    PubMed Central

    Rodríguez-Ruiz, D.; Diez-Vega, I.; Rodríguez-Matoso, D.; Fernandez-del-Valle, M.; Sagastume, R.; Molina, J. J.

    2014-01-01

    The aim of this study was to evaluate the normalized response speed (Vrn) of the knee musculature (flexor and extensor) in high competitive level volleyball players using tensiomyography (TMG) and to analyze the muscular response of the vastus medialis (VM), rectus femoris (RF), vastus lateralis (VL), and biceps femoris (BF) in accordance with the specific position they play in their teams. One hundred and sixty-six players (83 women and 83 men) were evaluated. They belonged to eight teams in the Spanish women's superleague and eight in the Spanish men's superleague. The use of Vrn allows avoiding possible sample imbalances due to anatomical and functional differences and demands. We found differences between Vrn in each of the muscles responsible for extension (VM, RF, and VL) and flexion (BF) regardless of the sex. Normalized response speed differences seem to be larger in setters, liberos and outside players compared to middle blockers and larger in males when compared to females. These results of Vrn might respond to the differences in the physical and technical demands of each specific position, showing an improved balance response of the knee extensor and flexor musculature in male professional volleyball players. PMID:25003109

  10. Forum on Workforce Development

    NASA Technical Reports Server (NTRS)

    Hoffman, Edward

    2010-01-01

    APPEL Mission: To support NASA's mission by promoting individual, team, and organizational excellence in program/project management and engineering through the application of learning strategies, methods, models, and tools. Goals: a) Provide a common frame of reference for NASA s technical workforce. b) Provide and enhance critical job skills. c) Support engineering, program and project teams. d) Promote organizational learning across the agency. e) Supplement formal educational programs.

  11. Design of Value-Added Models for IMPACT and TEAM in DC Public Schools, 2010-2011 School Year. Final Report

    ERIC Educational Resources Information Center

    Isenberg, Eric; Hock, Heinrich

    2011-01-01

    This report presents the value-added models that will be used to measure school and teacher effectiveness in the District of Columbia Public Schools (DCPS) in the 2010-2011 school year. It updates the earlier technical report, "Measuring Value Added for IMPACT and TEAM in DC Public Schools." The earlier report described the methods used…

  12. 48 CFR 301.607-71 - FAC-P/PM levels and requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...) General Business Competencies: Includes decision-making, interpersonal skills, oral communication, team-building, and writing. (4) Technical Competencies: Includes contracting, financial management, quality...

  13. 48 CFR 301.607-71 - FAC-P/PM levels and requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...) General Business Competencies: Includes decision-making, interpersonal skills, oral communication, team-building, and writing. (4) Technical Competencies: Includes contracting, financial management, quality...

  14. 48 CFR 301.607-71 - FAC-P/PM levels and requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...) General Business Competencies: Includes decision-making, interpersonal skills, oral communication, team-building, and writing. (4) Technical Competencies: Includes contracting, financial management, quality...

  15. Overview of the CERT Resilience Management Model (CERT-RMM)

    DTIC Science & Technology

    2014-01-23

    Management Model (CERT®-RMM) Jim Cebula Technical Manager - Cyber Risk Management , CERT® Division Jim Cebula is the Technical Manager of the...Cyber Risk Management team in the Cyber Security Solutions Directorate of the CERT Division at the Software Engineering Institute (SEI), a unit of...Carnegie Mellon University. Cebula’s current activities include risk management methods along with assessment and management of operational

  16. Meningomyelocele Simulation Model: Pre-surgical Management–Technical Report

    PubMed Central

    Angert, Robert M

    2018-01-01

    This technical report describes the creation of a myelomeningocele model of a newborn baby. This is a simple, low-cost, and easy-to-assemble model that allows the medical team to practice the delivery room management of a newborn with myelomeningocele. The report includes scenarios and a suggested checklist with which the model can be employed. PMID:29713576

  17. The California spotted owl: a technical assessment of its current status

    Treesearch

    Jared Verner; Kevin S. McKelvey; Barry R. Noon; R. J. Gutierrez; Gordon I. Jr. Gould; Thomas W. Beck

    1992-01-01

    This report is based an the Final Repart submitted on May 8, 1992 by the Technical Assessment Team to the interagency Steering Committee for the California Spotted Owl Assessment. The 13 chapters cover the assessment of the current status of the California spotted owl, its biology and habitat use, and forests where the subspecies occurs in the Sierra Nevada and...

  18. Manpower Services in the Workplace. An Employer Technical Services Program for a State Employment Service.

    ERIC Educational Resources Information Center

    Kirsch, Arthur W.; And Others

    This report outlines a program through which a State Employment Service, using existing resources, can provide employers and their workers with a broad range of technical services in order to improve productivity and make work more tolerable. The report is based on observations and analysis by a team of participant-observers of a Skill Improvement…

  19. Meningomyelocele Simulation Model: Pre-surgical Management-Technical Report.

    PubMed

    Rosen, Orna; Angert, Robert M

    2018-02-26

    This technical report describes the creation of a myelomeningocele model of a newborn baby. This is a simple, low-cost, and easy-to-assemble model that allows the medical team to practice the delivery room management of a newborn with myelomeningocele. The report includes scenarios and a suggested checklist with which the model can be employed.

  20. Enterprise Planning for Change; Co-ordination of Manpower and Technical Planning. Industrial Relations Aspects of Manpower Policy, No. 5.

    ERIC Educational Resources Information Center

    Wedderburn, Dorothy

    Forty case studies made by research teams of independents or governmental agencies in Austria, Canada, France, Germany, Norway, Sweden, United Kingdom, and the United States were analyzed to provide managements and trade unions with illustrations of present systems of technical and manpower changes at the enterprise level and to describe the…

  1. Communicating to Influence Drug Development and Regulatory Decisions: A Tutorial

    PubMed Central

    Mehrotra, S

    2016-01-01

    Pharmacometricians require three skills to be influential: technical, business (e.g., drug development), and soft skills (e.g., communication). Effective communication is required to translate technical and often complicated quantitative findings to interdisciplinary team members in order to influence drug development or regulatory decisions. In this tutorial, we highlight important aspects related to communicating pharmacometric analysis to influence decisions. PMID:27299706

  2. Leader evaluation and team cohesiveness in the process of team development: A matter of gender?

    PubMed Central

    Sczesny, Sabine; Gumí, Tània; Guimerà, Roger; Sales-Pardo, Marta

    2017-01-01

    Leadership positions are still stereotyped as masculine, especially in male-dominated fields (e.g., engineering). So how do gender stereotypes affect the evaluation of leaders and team cohesiveness in the process of team development? In our study participants worked in 45 small teams (4–5 members). Each team was headed by either a female or male leader, so that 45 leaders (33% women) supervised 258 team members (39% women). Over a period of nine months, the teams developed specific engineering projects as part of their professional undergraduate training. We examined leaders’ self-evaluation, their evaluation by team members, and team cohesiveness at two points of time (month three and month nine, the final month of the collaboration). While we did not find any gender differences in leaders’ self-evaluation at the beginning, female leaders evaluated themselves more favorably than men at the end of the projects. Moreover, female leaders were evaluated more favorably than male leaders at the beginning of the project, but the evaluation by team members did not differ at the end of the projects. Finally, we found a tendency for female leaders to build more cohesive teams than male leaders. PMID:29059231

  3. Education and Training of Emergency Medical Teams: Recommendations for a Global Operational Learning Framework.

    PubMed

    Amat Camacho, Nieves; Hughes, Amy; Burkle, Frederick M; Ingrassia, Pier Luigi; Ragazzoni, Luca; Redmond, Anthony; Norton, Ian; von Schreeb, Johan

    2016-10-21

    An increasing number of international emergency medical teams are deployed to assist disaster-affected populations worldwide. Since Haiti earthquake those teams have been criticised for ill adapted care, lack of preparedness in addition to not coordinating with the affected country healthcare system. The Emergency Medical Teams (EMTs) initiative, as part of the Word Health Organization's Global Health Emergency Workforce program, aims to address these shortcomings by improved EMT coordination, and mechanisms to ensure quality and accountability of national and international EMTs. An essential component to reach this goal is appropriate education and training. Multiple disaster education and training programs are available. However, most are centred on individuals' professional development rather than on the EMTs operational performance. Moreover, no common overarching or standardised training frameworks exist. In this report, an expert panel review and discuss the current approaches to disaster education and training and propose a three-step operational learning framework that could be used for EMTs globally. The proposed framework includes the following steps: 1) ensure professional competence and license to practice, 2) support adaptation of technical and non-technical professional capacities into the low-resource and emergency context and 3) prepare for an effective team performance in the field. A combination of training methodologies is also recommended, including individual theory based education, immersive simulations and team training. Agreed curriculum and open access training materials for EMTs need to be further developed, ideally through collaborative efforts between WHO, operational EMT organizations, universities, professional bodies and training agencies.  Keywords: disasters; education; emergencies; global health; learning.

  4. Education and Training of Emergency Medical Teams: Recommendations for a Global Operational Learning Framework

    PubMed Central

    Amat Camacho, Nieves; Hughes, Amy; Burkle, Frederick M.; Ingrassia, Pier Luigi; Ragazzoni, Luca; Redmond, Anthony; Norton, Ian; von Schreeb, Johan

    2016-01-01

    An increasing number of international emergency medical teams are deployed to assist disaster-affected populations worldwide. Since Haiti earthquake those teams have been criticised for ill adapted care, lack of preparedness in addition to not coordinating with the affected country healthcare system. The Emergency Medical Teams (EMTs) initiative, as part of the Word Health Organization’s Global Health Emergency Workforce program, aims to address these shortcomings by improved EMT coordination, and mechanisms to ensure quality and accountability of national and international EMTs. An essential component to reach this goal is appropriate education and training. Multiple disaster education and training programs are available. However, most are centred on individuals’ professional development rather than on the EMTs operational performance. Moreover, no common overarching or standardised training frameworks exist. In this report, an expert panel review and discuss the current approaches to disaster education and training and propose a three-step operational learning framework that could be used for EMTs globally. The proposed framework includes the following steps: 1) ensure professional competence and license to practice, 2) support adaptation of technical and non-technical professional capacities into the low-resource and emergency context and 3) prepare for an effective team performance in the field. A combination of training methodologies is also recommended, including individual theory based education, immersive simulations and team training. Agreed curriculum and open access training materials for EMTs need to be further developed, ideally through collaborative efforts between WHO, operational EMT organizations, universities, professional bodies and training agencies.  Keywords: disasters; education; emergencies; global health; learning PMID:27917306

  5. Fluid Balance in Team Sport Athletes and the Effect of Hypohydration on Cognitive, Technical, and Physical Performance.

    PubMed

    Nuccio, Ryan P; Barnes, Kelly A; Carter, James M; Baker, Lindsay B

    2017-10-01

    Sweat losses in team sports can be significant due to repeated bursts of high-intensity activity, as well as the large body size of athletes, equipment and uniform requirements, and environmental heat stress often present during training and competition. In this paper we aimed to: (1) describe sweat losses and fluid balance changes reported in team sport athletes, (2) review the literature assessing the impact of hypohydration on cognitive, technical, and physical performance in sports-specific studies, (3) briefly review the potential mechanisms by which hypohydration may impact team sport performance, and (4) discuss considerations for future directions. Significant hypohydration (mean body mass loss (BML) >2%) has been reported most consistently in soccer. Although American Football, rugby, basketball, tennis, and ice hockey have reported high sweating rates, fluid balance disturbances have generally been mild (mean BML <2%), suggesting that drinking opportunities were sufficient for most athletes to offset significant fluid losses. The effect of hydration status on team sport performance has been studied mostly in soccer, basketball, cricket, and baseball, with mixed results. Hypohydration typically impaired performance at higher levels of BML (3-4%) and when the method of dehydration involved heat stress. Increased subjective ratings of fatigue and perceived exertion consistently accompanied hypohydration and could explain, in part, the performance impairments reported in some studies. More research is needed to develop valid, reliable, and sensitive sport-specific protocols and should be used in future studies to determine the effects of hypohydration and modifying factors (e.g., age, sex, athlete caliber) on team sport performance.

  6. Team Massachusetts & Central America Solar Decathlon 2015 Final Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lee, Kenneth

    Our team was Team MASSCA (Massachusetts and Central America), which was a partnership of Western New England University (WNE) located in Massachusetts USA, The Technological University of Panama (UTP), and Central American Technological University (UNITEC) of Honduras. Together we had a group of 6 faculty members and approximately 30 undergraduate students. Our house is ‘The EASI’ House, which stands for Efficient, Affordable, Solar Innovation. The EASI house is rectangular with two bedrooms and one bath, and offers a total square footage of 680. Based on competition estimates, The EASI house costs roughly $121,000. The EASI house has a 5kW solarmore » system. Faculty and students from all three institutions were represented at the competition in Irvine California. Team MASSCA did well considering this was our first entry in the Solar Decathlon competition. Team MASSCA won the following awards: First Place – Affordability Contest Second Place – Energy Balance Contest. The competition provided a great experience for our students (and faculty as well). This competition provided leadership, endurance, and technical knowledge/skills for our students, and was the single most important hands-on experience during their undergraduate years. We are extremely pleased with the awards we received. At the same time we have learned from our efforts and would do better if we were to compete in the future. Furthermore, as a result of our team’s Inter-Americas collaborative effort, UTP and WNE have partnered to form Team PANAMASS (PANAma and MASSachusetts) and have developed The 3 SMART House for the inaugural Solar Decathlon Latin America & Caribbean competition held in Colombia.« less

  7. Cluster randomized trial of a multilevel evidence-based quality improvement approach to tailoring VA Patient Aligned Care Teams to the needs of women Veterans.

    PubMed

    Yano, Elizabeth M; Darling, Jill E; Hamilton, Alison B; Canelo, Ismelda; Chuang, Emmeline; Meredith, Lisa S; Rubenstein, Lisa V

    2016-07-19

    The Veterans Health Administration (VA) has undertaken a major initiative to transform care through implementation of Patient Aligned Care Teams (PACTs). Based on the patient-centered medical home (PCMH) concept, PACT aims to improve access, continuity, coordination, and comprehensiveness using team-based care that is patient-driven and patient-centered. However, how VA should adapt PACT to meet the needs of special populations, such as women Veterans (WVs), was not considered in initial implementation guidance. WVs' numerical minority in VA healthcare settings (approximately 7-8 % of users) creates logistical challenges to delivering gender-sensitive comprehensive care. The main goal of this study is to test an evidence-based quality improvement approach (EBQI) to tailoring PACT to meet the needs of WVs, incorporating comprehensive primary care services and gender-specific care in gender-sensitive environments, thereby accelerating achievement of PACT tenets for women (Women's Health (WH)-PACT). EBQI is a systematic approach to developing a multilevel research-clinical partnership that engages senior organizational leaders and local quality improvement (QI) teams in adapting and implementing new care models in the context of prior evidence and local practice conditions, with researchers providing technical support, formative feedback, and practice facilitation. In a 12-site cluster randomized trial, we will evaluate WH-PACT model achievement using patient, provider, staff, and practice surveys, in addition to analyses of secondary administrative and chart-based data. We will explore impacts of receipt of WH-PACT care on quality of chronic disease care and prevention, health status, patient satisfaction and experience of care, provider experience, utilization, and costs. Using mixed methods, we will assess pre-post practice contexts; document EBQI activities undertaken in participating facilities and their relationship to provider/staff and team actions/attitudes; document WH-PACT implementation; and examine barriers/facilitators to EBQI-supported WH-PACT implementation through a combination of semi-structured interviews and monthly formative progress narratives and administrative data. Lack of gender-sensitive comprehensive care has demonstrated consequences for the technical quality and ratings of care among WVs and may contribute to decisions to continue use or seek care elsewhere under the US Affordable Care Act. We hypothesize that tailoring PACT implementation through EBQI may improve the experience and quality of care at many levels. ClinicalTrials.gov, NCT02039856.

  8. Physical demands in elite team handball: comparisons between male and female players.

    PubMed

    Michalsik, L B; Aagaard, P

    2015-09-01

    The aim of the present study was to examine potential differences in the physical demands imposed on male vs. female adult elite team handball players during match-play. Male and female elite team handball players were monitored over a six and five season time span, respectively. Each player was evaluated during match-play by use of video recording and subsequent computerized locomotive and technical match analysis. Furthermore, physiological measurements during match-play, physical testing and anthropometric measurements were performed. Female players (FP, N.=82) covered a longer mean total distance per match (4693±333 m, group means±SD) compared to male players (MP, N.=83, 3945±538 m) when playing full time (P<0.01). FP exercised at a greater relative workload (79.4% of VO2-max) than MP (70.9% of VO2-max, P<0.05), but performed less high-intense running per match (2.5% of total distance covered) than MP (7.9%, P<0.01). FP also spent less time standing still (10.8% of total effective playing time) compared to MP (36.9%, P<0.001) and showed fewer activity changes (663.8±99.7) compared to MP (1482.4±312.6, P<0.001). MP received more tackles in total in offence (34.5±21.3) and performed more tackles in total in defence (29.9±12.3) compared to FP (14.6±9.2, 20.7±9.7, P<0.05). Furthermore, MP performed more high-intense technical playing actions per match (36.9±13.1) than FP (28.3±11.0, P<0.05). The mean body height and body mass differed between MP (189.6±5.8 cm, 91.7±7.5 kg) and FP (175.4±6.1 cm, 69.5±6.5 kg, P<0.001). Substantial gender-specific differences in the physical demands in elite team handball were observed, with MP performing more high-intense, strength-related playing actions and high-intensity running than FP. Conversely, FP covered a greater total distance and demonstrated a higher relative workload than MP. The physical training of male and female elite team handball players should be designed to reflect these contrasting needs.

  9. Implementation of consumer providers into mental health intensive case management teams.

    PubMed

    Hamilton, Alison B; Chinman, Matthew; Cohen, Amy N; Oberman, Rebecca Shoai; Young, Alexander S

    2015-01-01

    In mental health care, consumer providers (CPs) are individuals with serious mental illness (SMI) who draw upon their lived experiences while providing services to others with SMI. Implementation of CPs has proven to be challenging in a variety of settings. The PEER project (Peers Enhancing Recovery) involved rolling out CPs using an implementation science model and evaluating implementation and impact in mental health treatment settings (three intervention, three control). In qualitative interviews, facilitators and challenges to implementation were described by the CPs, their team members, clients, and study researchers. Site preparation, external facilitation, and positive, reinforcing experiences with CPs facilitated implementation. Role definitions and deficiencies in CPs' technical knowledge posed challenges to implementation. Sustainability was not realized due to insufficient resources. However, implementation was positive overall, characterized by diffusion of innovation concepts of high relative advantage, strong trialability, compatibility with prevailing norms, compelling observability, and relatively low complexity. By preparing and working systematically with intervention sites to incorporate new services, implementation was strengthened and challenges were minimized.

  10. Student-Directed Video Validation of Psychomotor Skills Performance: A Strategy to Facilitate Deliberate Practice, Peer Review, and Team Skill Sets.

    PubMed

    DeBourgh, Gregory A; Prion, Susan K

    2017-03-22

    Background Essential nursing skills for safe practice are not limited to technical skills, but include abilities for determining salience among clinical data within dynamic practice environments, demonstrating clinical judgment and reasoning, problem-solving abilities, and teamwork competence. Effective instructional methods are needed to prepare new nurses for entry-to-practice in contemporary healthcare settings. Method This mixed-methods descriptive study explored self-reported perceptions of a process to self-record videos for psychomotor skill performance evaluation in a convenience sample of 102 pre-licensure students. Results Students reported gains in confidence and skill acquisition using team skills to record individual videos of skill performance, and described the importance of teamwork, peer support, and deliberate practice. Conclusion Although time consuming, the production of student-directed video validations of psychomotor skill performance is an authentic task with meaningful accountabilities that is well-received by students as an effective, satisfying learner experience to increase confidence and competence in performing psychomotor skills.

  11. Outcomes study of a customer relations educational program in dialysis practice.

    PubMed

    Schmidt, Jill

    2006-01-01

    In the fall of 2003, a customer relations staff educational program was instituted for use throughout Renal Care Group. After 1 year and 4 months, an outcomes study was implemented to evaluate and revise the program. The program is taught by the dialysis social worker to the rest of the dialysis health-care team to increase customer relations skills with the patients, their families, and dialysis coworkers. Today, more than ever, patients are seeking better quality health care not only in technical skills but also in compassionate care. Pretest and posttest scores from each training session indicated the necessity of this training and knowledge gained. Through a survey of instructors, strengths of the program were identified, as well as were areas that needed revision. In addition to providing helpful information, some of the main strengths of the program indicated by instructors were team building and problem solving. Revisions consisted primarily of shortening the modules and simplifying the program's use.

  12. Scientific and Technical Information (STI) for Financial Assistance and Non-M&O/M&I

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaGrandeur, John; Crane, Doug

    2012-07-02

    BSST (hereafter referred to as Amerigon) began work in November 2004 under a cost share contract [1] awarded by the U.S. Department of Energy Freedom Car Office to develop a high efficiency Thermoelectric Waste Energy Recovery System for passenger vehicle applications. The system increases fuel economy by partially replacing the electric power produced by the alternator with electric power produced by conversion of exhaust gas in a Thermoelectric Generator (TEG). Amerigon’s team members included the BMW Group and Ford Motor Company, with both OEMs demonstrating the TEG system in their vehicles in the final program phase. Significant progress was mademore » in modeling, building and testing the TEG system from the lowest subassembly levels through an entire vehicle system. By the program’s conclusion, the team had successfully overcome the challenges of integrating TE materials into an exhaust system component and evaluated the system behavior in bench and over the road testing for over six months.« less

  13. Managing the replacement cycle of laser inventory.

    PubMed

    Davis, C E

    1992-01-01

    Medical lasers are quickly moving into the replacement phase of technology management. Barnes Hospital (St. Louis, MO) is using its laser team to define a process of planned laser replacement using the experience gained from traditional medical equipment replacement cycles, quality improvement principles and tools, and other formalized interdisciplinary teams. The process described in this paper has six basic steps: (1) A decision is made to request a replacement laser. (2) An appropriation request form is completed and submitted with the clinical and/or technical justifications. (3) Those requests initiated outside of the Clinical Engineering Department are reviewed by the Clinical Engineer/Medical Laser Safety Officer (CE/MLSO). (4) The CE/MLSO presents the requests to the hospital Laser Committee, and (5) then to the Laser Users' Group. (6) Finally, an Expenditure Authorization Committee reviews all capital expense requests, including those for replacement lasers, and allocates funds for the next fiscal year. This paper illustrates and evaluates the process, using an example from the review process for 1993 equipment purchases at Barnes Hospital.

  14. A randomized wait-list controlled analysis of the implementation integrity of team-initiated problem solving processes.

    PubMed

    Newton, J Stephen; Horner, Robert H; Algozzine, Bob; Todd, Anne W; Algozzine, Kate

    2012-08-01

    Members of Positive Behavior Interventions and Supports (PBIS) teams from 34 elementary schools participated in a Team-Initiated Problem Solving (TIPS) Workshop and follow-up technical assistance. Within the context of a randomized wait-list controlled trial, team members who were the first recipients of the TIPS intervention demonstrated greater implementation integrity in using the problem-solving processes during their team meetings than did members of PBIS Teams in the Wait-List Control group. The success of TIPS at improving implementation integrity of the problem-solving processes is encouraging and suggests the value of conducting additional research focused on determining whether there is a functional relation between use of these problem-solving processes and actual resolution of targeted student academic and social problems. Copyright © 2012 Society for the Study of School Psychology. Published by Elsevier Ltd. All rights reserved.

  15. The organization of multidisciplinary care teams: modeling internal and external influences on cancer care quality.

    PubMed

    Fennell, Mary L; Das, Irene Prabhu; Clauser, Steven; Petrelli, Nicholas; Salner, Andrew

    2010-01-01

    Quality cancer treatment depends upon careful coordination between multiple treatments and treatment providers, the exchange of technical information, and regular communication between all providers and physician disciplines involved in treatment. This article will examine a particular type of organizational structure purported to regularize and streamline the communication between multiple specialists and support services involved in cancer treatment: the multidisciplinary treatment care (MDC) team. We present a targeted review of what is known about various types of MDC team structures and their impact on the quality of treatment care, and we outline a conceptual model of the connections between team context, structure, process, and performance and their subsequent effects on cancer treatment care processes and patient outcomes. Finally, we will discuss future research directions to understand how MDC teams improve patient outcomes and how characteristics of team structure, culture, leadership, and context (organizational setting and local environment) contribute to optimal multidisciplinary cancer care.

  16. Teamwork and error in the operating room: analysis of skills and roles.

    PubMed

    Catchpole, K; Mishra, A; Handa, A; McCulloch, P

    2008-04-01

    To analyze the effects of surgical, anesthetic, and nursing teamwork skills on technical outcomes. The value of team skills in reducing adverse events in the operating room is presently receiving considerable attention. Current work has not yet identified in detail how the teamwork and communication skills of surgeons, anesthetists, and nurses affect the course of an operation. Twenty-six laparoscopic cholecystectomies and 22 carotid endarterectomies were studied using direct observation methods. For each operation, teams' skills were scored for the whole team, and for nursing, surgical, and anesthetic subteams on 4 dimensions (leadership and management [LM]; teamwork and cooperation; problem solving and decision making; and situation awareness). Operating time, errors in surgical technique, and other procedural problems and errors were measured as outcome parameters for each operation. The relationships between teamwork scores and these outcome parameters within each operation were examined using analysis of variance and linear regression. Surgical (F(2,42) = 3.32, P = 0.046) and anesthetic (F(2,42) = 3.26, P = 0.048) LM had significant but opposite relationships with operating time in each operation: operating time increased significantly with higher anesthetic but decreased with higher surgical LM scores. Errors in surgical technique had a strong association with surgical situation awareness (F(2,42) = 7.93, P < 0.001) in each operation. Other procedural problems and errors were related to the intraoperative LM skills of the nurses (F(5,1) = 3.96, P = 0.027). Detailed analysis of team interactions and dimensions is feasible and valuable, yielding important insights into relationships between nontechnical skills, technical performance, and operative duration. These results support the concept that interventions designed to improve teamwork and communication may have beneficial effects on technical performance and patient outcome.

  17. Health care multidisciplinary teams: The sociotechnical approach for an integrated system-wide perspective.

    PubMed

    Marsilio, Marta; Torbica, Aleksandra; Villa, Stefano

    The current literature on the enabling conditions of multidisciplinary teams focuses on the singular dimensions of the organizations (i.e., human resources, clinical pathways, objects) without shedding light on to the way in which these organizational factors interact and mutually influence one another. Drawing on a system perspective of organizations, the authors analyze the organizational patterns that promote and support multidisciplinary teams and how they interrelate and interact to enforce the organization work system. The authors develop a modified sociotechnical system (STS) model to understand how the two dimensions of technical (devices/tools, layout/organization of space, core process standardization) and social (organizational structure, management of human resources and operations) can facilitate the implementation of multidisciplinary teams in health care. The study conducts an empirical analysis based on a sample of hospital adopters of transcatheter aortic valve implantation using the revised STS model. The modified STS model applied to the case studies improves our understanding of the critical implementation factors of a multidisciplinary approach and the importance of coordinating radical changes in the technical and the social subsystems of health care organizations. The analysis informs that the multidisciplinary effort is not a sequential process and that the interplay between the two subsystems needs to be managed efficaciously as an integrated organizational whole to deliver the goals set. Hospital managers must place equal focus on the closely interrelated technical and social dimensions by investing in (a) shared layouts and spaces that cross the boundaries of the specialized health care units, (b) standardization of the core processes through the implementation of local clinical pathways, (c) structured knowledge management mechanisms, (d) the creation of clinical directorates, and (e) the design of a planning and budgeting system that integrates the multidisciplinary concept.

  18. American Recovery and Reinvestment Act (ARRA) - FEMP Technical Assistance - Federal Aviation Administration - Project 209 - Control Tower and Support Building, Boise, Idaho

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Arends, J.; Sandusky, William F.

    2010-06-28

    This report documents an energy audit performed by Pacific Northwest National Laboratory (PNNL) and Redhorse Corporation (Redhorse) conducted on the Federal Aviation Administration (FAA) control tower and base building in Boise, Idaho. This report presents findings of the energy audit team that evaluated construction documents and operating specifications (at the 100% level) followed by a site visit of the facility under construction. The focus of the review was to identify measures that could be incorporated into the final design and operating specifications that would result in additional energy savings for FAA that would not have otherwise occurred.

  19. Deep Impact Delta II Launch Vehicle Cracked Thick Film Coating on Electronic Packages Technical Consultation Report

    NASA Technical Reports Server (NTRS)

    Cameron, Kenneth D.; Kichak, Robert A.; Piascik, Robert S.; Leidecker, Henning W.; Wilson, Timmy R.

    2009-01-01

    The Deep Impact spacecraft was launched on a Boeing Delta II rocket from Cape Canaveral Air Force Station (CCAFS) on January 12, 2005. Prior to the launch, the Director of the Office of Safety and Mission Assurance (OS&MA) requested the NASA Engineering and Safety Center (NESC) lead a team to render an independent opinion on the rationale for flight and the risk code assignments for the hazard of cracked Thick Film Assemblies (TFAs) in the E-packages of the Delta II launch vehicle for the Deep Impact Mission. The results of the evaluation are contained in this report.

  20. Evaluation of Agency Non-Code Layered Pressure Vessels (LPVs) . Volume 2; Appendices

    NASA Technical Reports Server (NTRS)

    Prosser, William H.

    2014-01-01

    In coordination with the Office of Safety and Mission Assurance and the respective Center Pressure System Managers (PSMs), the NASA Engineering and Safety Center (NESC) was requested to formulate a consensus draft proposal for the development of additional testing and analysis methods to establish the technical validity, and any limitation thereof, for the continued safe operation of facility non-code layered pressure vessels. The PSMs from each NASA Center were asked to participate as part of the assessment team by providing, collecting, and reviewing data regarding current operations of these vessels. This document contains the appendices to the main report.

  1. System engineering of the Atacama Large Millimeter/submillimeter Array

    NASA Astrophysics Data System (ADS)

    Bhatia, Ravinder; Marti, Javier; Sugimoto, Masahiro; Sramek, Richard; Miccolis, Maurizio; Morita, Koh-Ichiro; Arancibia, Demián.; Araya, Andrea; Asayama, Shin'ichiro; Barkats, Denis; Brito, Rodrigo; Brundage, William; Grammer, Wes; Haupt, Christoph; Kurlandczyk, Herve; Mizuno, Norikazu; Napier, Peter; Pizarro, Eduardo; Saini, Kamaljeet; Stahlman, Gretchen; Verzichelli, Gianluca; Whyborn, Nick; Yagoubov, Pavel

    2012-09-01

    The Atacama Large Millimeter/submillimeter Array (ALMA) will be composed of 66 high precision antennae located at 5000 meters altitude in northern Chile. This paper will present the methodology, tools and processes adopted to system engineer a project of high technical complexity, by system engineering teams that are remotely located and from different cultures, and in accordance with a demanding schedule and within tight financial constraints. The technical and organizational complexity of ALMA requires a disciplined approach to the definition, implementation and verification of the ALMA requirements. During the development phase, System Engineering chairs all technical reviews and facilitates the resolution of technical conflicts. We have developed analysis tools to analyze the system performance, incorporating key parameters that contribute to the ultimate performance, and are modeled using best estimates and/or measured values obtained during test campaigns. Strict tracking and control of the technical budgets ensures that the different parts of the system can operate together as a whole within ALMA boundary conditions. System Engineering is responsible for acceptances of the thousands of hardware items delivered to Chile, and also supports the software acceptance process. In addition, System Engineering leads the troubleshooting efforts during testing phases of the construction project. Finally, the team is conducting System level verification and diagnostics activities to assess the overall performance of the observatory. This paper will also share lessons learned from these system engineering and verification approaches.

  2. Technical Assistance Program: Off to a Running Start (Newsletter)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This newsletter describes key activities of the DOE Office of Indian Energy Policy and Programs for Winter 2012. Between December 2, 2011, and January 15, 2012, 46 American Indian and Alaska Native Tribes submitted applications to receive technical assistance through the program, which provides Tribes with on-the-ground technical support from DOE and National Renewable Energy Laboratory (NREL) staff to help move tribal energy efficiency and renewable energy projects forward. The applications are being considered through the Strategic Technical Assistance Response Team (START) selection process, which incorporates expert reviews and outreach to Tribes who present a need for assistance with theirmore » community-based energy efficiency and renewable energy projects. The final successful applicants will be selected based on the clarity of their requests for technical assistance and the ability of START to successfully work with each unique project or community. At least three selected Tribes in Alaska will receive technical assistance between March and May 2012, and up to five selected Tribes in the contiguous United States will receive technical assistance between March and August 2012. During the months of START Program activity, DOE and NREL experts will work in the two locations. In Alaska, START experts will work directly with community-based project teams to analyze local energy issues and provide assistance with energy projects and cost savings initiatives. This effort will be bolstered by DOE-IE's partnership with the Denali Commission, which will provide further assistance and expertise. In the lower 48 states, NREL experts will work with the selected renewable energy START projects to evaluate financial and technical feasibility and provide early development technical assistance to better position the projects for financing and construction. This on-the-ground technical assistance is part of a broader DOE-IE effort to make reliable, accurate technical information and skills-based training available to tribal communities throughout the United States. The primary goal of the START initiative, according to DOE-IE Director Tracey A. LeBeau, is to bring about the next generation of energy development in Indian Country. Through energy project planning, quality training, and technical assistance, The START program will leverage the early-stage resource characterization and pre-feasibility investments that DOE has made in Indian Country over the years, and unlock the energy resources that exist on tribal lands to help build a 21st century tribal energy economy. Working collaboratively with a select group of Tribes and Alaska Native entities, the DOE Office of Indian Energy, NREL, and the Denali Commission will empower tribal leaders to make informed energy decisions and help build capacity to bring tribal energy visions to fruition and get renewable energy projects off the ground, said LeBeau. Ultimately, these efforts will serve to further the Obama Administration and DOE's shared commitment to provide Native American and Alaska Native communities with the tools and resources they need to foster tribal energy self-sufficiency and sustainability, advancing job creation and enhancing economic competitiveness.« less

  3. IDC Integrated Master Plan.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Clifford, David J.; Harris, James M.

    2014-12-01

    This is the IDC Re-Engineering Phase 2 project Integrated Master Plan (IMP). The IMP presents the major accomplishments planned over time to re-engineer the IDC system. The IMP and the associate Integrated Master Schedule (IMS) are used for planning, scheduling, executing, and tracking the project technical work efforts. REVISIONS Version Date Author/Team Revision Description Authorized by V1.0 12/2014 IDC Re- engineering Project Team Initial delivery M. Harris

  4. Wilkinson Microwave Anisotropy Probe (WMAP) Battery Operations Problem Resolution Team (PRT)

    NASA Technical Reports Server (NTRS)

    Keys, Denney J.

    2010-01-01

    The NASA Technical Discipline Fellow for Electrical Power, was requested to form a Problem Resolution Team (PRT) to help assess the health of the flight battery that is currently operating aboard NASA's Wilkinson Microwave Anisotropy Probe (WMAP) and provide recommendations for battery operations to mitigate the risk of impacting science operations for the rest of the mission. This report contains the outcome of the PRT's assessment.

  5. Applying Strategic Visualization(Registered Trademark) to Lunar and Planetary Mission Design

    NASA Technical Reports Server (NTRS)

    Frassanito, John R.; Cooke, D. R.

    2002-01-01

    NASA teams, such as the NASA Exploration Team (NEXT), utilize advanced computational visualization processes to develop mission designs and architectures for lunar and planetary missions. One such process, Strategic Visualization (trademark), is a tool used extensively to help mission designers visualize various design alternatives and present them to other participants of their team. The participants, which may include NASA, industry, and the academic community, are distributed within a virtual network. Consequently, computer animation and other digital techniques provide an efficient means to communicate top-level technical information among team members. Today,Strategic Visualization(trademark) is used extensively both in the mission design process within the technical community, and to communicate the value of space exploration to the general public. Movies and digital images have been generated and shown on nationally broadcast television and the Internet, as well as in magazines and digital media. In our presentation will show excerpts of a computer-generated animation depicting the reference Earth/Moon L1 Libration Point Gateway architecture. The Gateway serves as a staging corridor for human expeditions to the lunar poles and other surface locations. Also shown are crew transfer systems and current reference lunar excursion vehicles as well as the Human and robotic construction of an inflatable telescope array for deployment to the Sun/Earth Libration Point.

  6. [Teaching non-technical skills for critical incidents: Crisis resource management training for medical students].

    PubMed

    Krüger, A; Gillmann, B; Hardt, C; Döring, R; Beckers, S K; Rossaint, R

    2009-06-01

    Physicians have to demonstrate non-technical skills, such as communication and team leading skills, while coping with critical incidents. These skills are not taught during medical education. A crisis resource management (CRM) training was established for 4th to 6th year medical students using a full-scale simulator mannikin (Emergency Care Simulator, ECS, METI). The learning objectives of the course were defined according to the key points of Gaba's CRM concept. The training consisted of theoretical and practical parts (3 simulation scenarios with debriefing). Students' self-assessment before and after the training provided the data for evaluation of the training outcome. A total of 65 students took part in the training. The course was well received in terms of overall course quality, debriefings and didactic presentation, the mean overall mark being 1.4 (1: best, 6: worst). After the course students felt significantly more confident when facing incidents in clinical practice. The main learning objectives were achieved. The effectiveness of applying the widely used ECS full-scale simulator in interdisciplinary teaching has been demonstrated. The training exposes students to crisis resource management issues and motivates them to develop non-technical skills.

  7. Introduction to special section on The U.S. IOOS Coastal and Ocean Modeling Testbed

    NASA Astrophysics Data System (ADS)

    Luettich, Richard A.; Wright, L. Donelson; Signell, Richard; Friedrichs, Carl; Friedrichs, Marjy; Harding, John; Fennel, Katja; Howlett, Eoin; Graves, Sara; Smith, Elizabeth; Crane, Gary; Baltes, Rebecca

    2013-12-01

    Strong and strategic collaborations among experts from academia, federal operational centers, and industry have been forged to create a U.S. IOOS Coastal and Ocean Modeling Testbed (COMT). The COMT mission is to accelerate the transition of scientific and technical advances from the coastal and ocean modeling research community to improved operational ocean products and services. This is achieved via the evaluation of existing technology or the development of new technology depending on the status of technology within the research community. The initial phase of the COMT has addressed three coastal and ocean prediction challenges of great societal importance: estuarine hypoxia, shelf hypoxia, and coastal inundation. A fourth effort concentrated on providing and refining the cyberinfrastructure and cyber tools to support the modeling work and to advance interoperability and community access to the COMT archive. This paper presents an overview of the initiation of the COMT, the findings of each team and a discussion of the role of the COMT in research to operations and its interface with the coastal and ocean modeling community in general. Detailed technical results are presented in the accompanying series of 16 technical papers in this special issue.

  8. Comparison of technical and physical activities between 8 vs. 8 and 11 vs. 11 games in young Korean soccer players

    PubMed Central

    Oh, Seong Hwan; Joo, Chang Hwa

    2018-01-01

    The aims of this study were to examine the differences in technical aspects and physical demands between small-size games (SSG; 8 vs. 8) and regular-size games (RSG; 11 vs. 11) in young Korean soccer players. Seventy-nine young soccer players from 6 teams (U-12) volunteered to participate in the study. The players completed 4 games (2 SSG, 62×51 m, and 2 RSG, 80×54 m) in 2 days. Each game was filmed to evaluate technical actions. Physical demand variables were measured using global positioning system technology. SSG showed significantly greater numbers of technical plays among 17 variables when compared to RSG (P<0.05). The players covered significantly greater total distance during low−, moderate−, and high-speed running and sprinting in SSG than in RSG (P<0.05). Higher numbers of high-intensity activities (repeated high-intensity efforts, explosive efforts, decelera-tions, accelerations, and sprinting) were observed in SSG compared to RSG (P<0.05). Mean heart rate was also higher in SSG than in RSG (P<0.05). Despite the greater physical demands during SSG, the exercise intensity was similar to that reported in previous studies. Therefore, the SSG format applied in the present study can be a suitable official game format for Korean young soccer players, resulting in significantly greater exposure to technical plays without excessive physical demands. PMID:29740560

  9. A Study of Placing Army Requirements on Contract

    DTIC Science & Technology

    2016-04-01

    perhaps being unable to control the external environment, has management authority over business and technical aspects of a specific program. The PM...research is the last element of the planning phase addressing both business and technical considerations. The acquisition team equips themselves with...report is the final product utilizing documented findings and supports the business strategy (DoD, Guidebook for the Acquisition of Services, 2011

  10. Training to Enhance Design Team Performance: A Cure for Tunnel Vision

    NASA Technical Reports Server (NTRS)

    Parker, James W.; Parker, Nelson C. (Technical Monitor)

    2001-01-01

    Design Team performance is a function of the quality and degree of academic training and the cumulative, learned experience of the individual members of the team. Teamwork, leadership, and communications certainly are factors that affect the measure of the performance of the team, but they are not addressed here. This paper focuses on accelerating the learned experience of team members and describes an organizational approach that can significantly increase the effective experience level for any engineering design team. The performance measure of the whole team can be increased by increasing the engineering disciplines' cross awareness of each other and by familiarizing them with their affect at the system level. Discipline engineers know their own discipline well, but typically are not intimately familiar with their technical interaction with and dependencies on all the other disciplines of engineering. These dependencies are design integration functions and are worked out well by the discipline engineers as long as they are involved in the design of types of systems that they have experience with.

  11. KSC-03pd0270

    NASA Image and Video Library

    2003-02-05

    KENNEDY SPACE CENTER, FLA. -- Members of the Recovery Management Team at KSC are at work in the Operations Support Building. They are part of the investigation into the accident that claimed orbiter Columbia and her crew of seven on Feb. 1, 2003, over East Texas as they returned to Earth after a 16-day research mission. Seated around the table (clockwise from far left) are Chris Hasselbring, Landing Operations, USA (co-chair of the Response Management Team); Don Maxwell, Safety, United Space Alliance (USA); Russ DeLoach, chief, Shuttle Mission Assurance Branch, NASA; George Jacobs, Shuttle Engineering; Jeff Campbell, Shuttle Engineering; Denny Gagen, Landing Recovery Manager (second co-chair of the team); and Dave Rainer, Launch and Landing Operations. The team is coordinating KSC technical support and assets to the Mishap Investigation Team in Barksdale, La., and providing support for the Recovery teams in Los Angeles, Texas, New Mexico, Arizona and California. In addition, the team is following up on local leads pertaining to potential debris in the KSC area. .

  12. KSC-03pd0271

    NASA Image and Video Library

    2003-02-05

    KENNEDY SPACE CENTER, FLA. - Two members of the Recovery Management Team at KSC are at work in the Operations Support Building. At left is Don Maxwell, Safety, United Space Alliance, and at right is Larry Ulmer, Safety, NASA. They are part of the investigation into the accident that claimed orbiter Columbia and her crew of seven on Feb. 1, 2003, over East Texas as they returned to Earth after a 16-day research mission. Other team members are Russ DeLoach, chief, Shuttle Mission Assurance Branch, NASA; George Jacobs, Shuttle Engineering; Jeff Campbell, Shuttle Engineering; Dave Rainer, Launch and Landing Operations; and the two co-chairs of the Response Management Team, Denny Gagen, Landing Recovery Manager, and Chris Hasselbring, Landing Operations, USA. The team is coordinating KSC technical support and assets to the Mishap Investigation Team in Barksdale, La., and providing support for the Recovery teams in Los Angeles, Texas, New Mexico, Arizona and California. In addition, the team is following up on local leads pertaining to potential debris in the KSC area. .

  13. STS-114 Engine Cut-off Sensor Anomaly Technical Consultation Report

    NASA Technical Reports Server (NTRS)

    Wilson, Timmy R.; Kichak, Robert A.; Ungar, Eugene K.; Cherney, Robert; Rickman, Steve L.

    2009-01-01

    The NESC consultation team participated in real-time troubleshooting of the Main Propulsion System (MPS) Engine Cutoff (ECO) sensor system failures during STS-114 launch countdown. The team assisted with External Tank (ET) thermal and ECO Point Sensor Box (PSB) circuit analyses, and made real-time inputs to the Space Shuttle Program (SSP) problem resolution teams. Several long-term recommendations resulted. One recommendation was to conduct cryogenic tests of the ECO sensors to validate, or disprove, the theory that variations in circuit impedance due to cryogenic effects on swaged connections within the sensor were the root cause of STS-114 failures.

  14. X-33 Phase 2

    NASA Technical Reports Server (NTRS)

    1997-01-01

    In response to Clause 17 of the Cooperative Agreement NCC8-115, Lockheed Martin Skunk Works has compiled an Annual Performance Report of the X-33/RLV Program. This report consists of individual reports from all industry team members, as well as NASA team centers. Contract award was announced on July 2, 1996 and the first milestone was hand delivered to NASA MSFC on July 17, 1996. The first year has been one of growth and progress as all team members staffed up and embarked on the technical adventure of the 20th century... the ultimate goal . . a Single Stage to Orbit (SSTO) Reuseable Launch Vehicle (RLV).

  15. The SOLA Team: A Star Formation Project To Study the Soul of Lupus with ALMA

    NASA Astrophysics Data System (ADS)

    De Gregorio-Monsalvo, Itziar; Saito, M.; Rodon, J.; Takahashi, S.

    2017-06-01

    The SOLA team is a multi-national and multi-wavelength collaboration composed by scientists with technical expertise in ALMA and in infrared and optical techniques. The aim of the team is to establish a low-mass star formation scenario based on the Lupus molecular clouds. In this talk I will present our unique catalog of pre-stellar and proto-stellar cores toward Lupus molecular clouds, the results on our latest studies in protoplanetary disks, as well as our ALMA Cycle 3 data aiming at testing the formation mechanism of sub-stellar objects in Lupus molecular clouds.

  16. Team Sports

    MedlinePlus

    ... sleds, which are affixed to two hockey skate blades under the seat. The sleds are about three ... encourages disabled people to participate in long-distance running. ATC provides support, training and technical expertise to ...

  17. Combining Systems and Teamwork Approaches to Enhance the Effectiveness of Safety Improvement Interventions in Surgery: The Safer Delivery of Surgical Services (S3) Program.

    PubMed

    McCulloch, Peter; Morgan, Lauren; New, Steve; Catchpole, Ken; Roberston, Eleanor; Hadi, Mohammed; Pickering, Sharon; Collins, Gary; Griffin, Damian

    2017-01-01

    Patient safety improvement interventions usually address either work systems or team culture. We do not know which is more effective, or whether combining approaches is beneficial. To compare improvement in surgical team performance after interventions addressing teamwork culture, work systems, or both. Suite of 5 identical controlled before-after intervention studies, with preplanned analysis of pooled data for indirect comparisons of strategies. Operating theatres in 5 UK hospitals performing elective orthopedic, plastic, or vascular surgery PARTICIPANTS:: All operating theatres staff, including surgeons, nurses, anaesthetists, and others INTERVENTIONS:: 4-month safety improvement interventions, using teamwork training (TT), systems redesign and standardization (SOP), Lean quality improvement, SOP + TT combination, or Lean + TT combination. Team technical and nontechnical performance and World Health Organization (WHO) checklist compliance, measured for 3 months before and after intervention using validated scales. Pooled data analysis of before-after change in active and control groups, comparing combined versus single and systems versus teamwork interventions, using 2-way ANOVA. We studied 453 operations, (255 intervention, 198 control). TT improved nontechnical skills and WHO compliance (P < 0.001), but not technical performance; systems interventions (Lean & SOP, 2 & 3) improved nontechnical skills and technical performance (P < 0.001) but improved WHO compliance less. Combined interventions (4 & 5) improved all performance measures except WHO time-out attempts, whereas single approaches (1 & 2 & 3) improved WHO compliance less (P < 0.001) and failed to improve technical performance. Safety interventions combining teamwork training and systems rationalization are more effective than those adopting either approach alone. This has important implications for safety improvement strategies in hospitals.

  18. Space Transportation System Liftoff Debris Mitigation Process Overview

    NASA Technical Reports Server (NTRS)

    Mitchell, Michael; Riley, Christopher

    2011-01-01

    Liftoff debris is a top risk to the Space Shuttle Vehicle. To manage the Liftoff debris risk, the Space Shuttle Program created a team with in the Propulsion Systems Engineering & Integration Office. The Shutt le Liftoff Debris Team harnesses the Systems Engineering process to i dentify, assess, mitigate, and communicate the Liftoff debris risk. T he Liftoff Debris Team leverages off the technical knowledge and expe rtise of engineering groups across multiple NASA centers to integrate total system solutions. These solutions connect the hardware and ana lyses to identify and characterize debris sources and zones contribut ing to the Liftoff debris risk. The solutions incorporate analyses sp anning: the definition and modeling of natural and induced environmen ts; material characterizations; statistical trending analyses, imager y based trajectory analyses; debris transport analyses, and risk asse ssments. The verification and validation of these analyses are bound by conservative assumptions and anchored by testing and flight data. The Liftoff debris risk mitigation is managed through vigilant collab orative work between the Liftoff Debris Team and Launch Pad Operation s personnel and through the management of requirements, interfaces, r isk documentation, configurations, and technical data. Furthermore, o n day of launch, decision analysis is used to apply the wealth of ana lyses to case specific identified risks. This presentation describes how the Liftoff Debris Team applies Systems Engineering in their proce sses to mitigate risk and improve the safety of the Space Shuttle Veh icle.

  19. Teaching audience analysis to the technical student

    NASA Technical Reports Server (NTRS)

    Debs, M. B.; Brillhart, L. V.

    1981-01-01

    Teaching audience analysis, as practiced in a technical writing course for engineering students, is discussed. Audience analysis is described as the task of defining the audience for a particular piece of writing and determining those characteristics of the audience which constrain the writer and effect reception of the message. A mature technical writing style that shows the tension produced when a text is written to be read and understood is considered in terms of audience analysis. Techniques include: (1) conveying to students the concept that a reader with certain expectations exist, (2) team teaching to preserve the context of a given technical discipline, and (3) assigning a technical report that addresses a variety of readers, thus establishing the complexity of audience oriented writing.

  20. Coaching interprofessional health care improvement teams: the coachee, the coach and the leader perspectives.

    PubMed

    Godfrey, Marjorie M; Andersson-Gare, Boel; Nelson, Eugene C; Nilsson, Mats; Ahlstrom, Gerd

    2014-05-01

    To investigate health care improvement team coaching activities from the perspectives of coachees, coaches and unit leaders in two national improvement collaboratives. Despite numerous methods to improve health care, inconsistencies in success have been attributed to factors that include unengaged staff, absence of supportive improvement resources and organisational inertia. Mixed methods sequential exploratory study design, including quantitative and qualitative data from interprofessional improvement teams who received team coaching. The coachees (n = 382), coaches (n = 9) and leaders (n = 30) completed three different data collection tools identifying coaching actions perceived to support improvement activities. Coachees, coaches and unit leaders in both collaboratives reported generally positive perceptions about team coaching. Four categories of coaching actions were perceived to support improvement work: context, relationships, helping and technical support. All participants agreed that regardless of who the coach is, emphasis should include the four categories of team coaching actions. Leaders should reflect on their efforts to support improvement teams and consider the four categories of team coaching actions. A structured team coaching model that offers needed encouragement to keep the team energized, seems to support health care improvement. © 2013 John Wiley & Sons Ltd.

  1. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kizilyalli, Isik; Evans, Craig; Matocha, Kevin

    The ARPA-E model is unique in that the agency does not just provide teams funding. Throughout the lifetime of an ARPA-E award, ARPA-E Program Directors and Tech-to-Market Advisors also provide teams with expert advice through quarterly reviews and onsite visits. This hands-on approach helps ensure teams can meet ambitious milestones, target and tackle problems early on, and advance their technologies towards commercialization. Program Director Dr. Isik Kizilyalli explains the importance of this active project management approach in helping teams identify and overcome barriers. In this video, Energy Storage Systems (ESS) from the GRIDS program and Monolith Semiconductors from the SWITCHESmore » program discuss how ARPA-E’s active project management approach helped them find solutions to technical challenges.« less

  2. Aquatic Ecosystem Enhancement at Mountaintop Mining Sites Symposium

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Black, D. Courtney; Lawson, Peter; Morgan, John

    2000-01-12

    Welcome to this symposium which is part of the ongoing effort to prepare an Environmental Impact Statement (EIS) regarding mountaintop mining and valley fills. The EIS is being prepared by the U.S. Environmental Protection Agency, U.S. Army Corps of Engineers, U.S. Office of Surface Mining, and U.S. Fish and Wildlife Service, in cooperation with the State of West Virginia. Aquatic Ecosystem Enhancement (AEE) at mountaintop mining sites is one of fourteen technical areas identified for study by the EIS Interagency Steering Committee. Three goals were identified in the AEE Work Plan: 1. Assess mining and reclamation practices to show howmore » mining operations might be carried out in a way that minimizes adverse impacts to streams and other environmental resources and to local communities. Clarify economic and technical constraints and benefits. 2. Help citizens clarify choices by showing whether there are affordable ways to enhance existing mining, reclamation, mitigation processes and/or procedures. 3. Ide identify data needed to improve environmental evaluation and design of mining projects to protect the environment. Today’s symposium was proposed in the AEE Team Work Plans but coordinated planning for the event began September 15, 1999 when representatives from coal industry, environmental groups and government regulators met in Morgantown. The meeting participants worked with a facilitator from the Canaan Valley Institute to outline plans for the symposium. Several teams were formed to carry out the plans we outlined in the meeting.« less

  3. Waste-water characterization and hazardous-waste technical assistance survey, Mather AFB California. Final report, 28 November-9 December 1988

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Scott, S.P.; Hedgecock, N.S.

    1989-10-01

    Personnel from the AFOEHL conducted a waste-water characterization and hazardous-waste technical assistance survey at MAFB from 28 Nov to 9 Dec 1988. The scope of this survey was to characterize the waste-water, address hazardous-waste-management practices, and explore opportunities for hazardous waste minimization. The waste water survey team analyzed the base's industrial effluent, effluent from oil/water separators, and storm water. The team performed a shop-by-shop evaluation of chemical-waste-management practices. Survey results showed that MAFB needs to improve its hazardous-waste-management program. Recommendations for improvement include: (1) Collecting two additional grab samples on separate days from the hospital discharge. Analyze for EPA Methodmore » 601 to determine if the grab sample from the survey gives a true indication of what is being discharged. (2) Locate the source and prevent mercury from the hospital from discharging into the sanitary sewer. (3) Dilute the soaps used for cleaning at the Fuels Lab, Building 7060. (4) Investigate the source of chromium from the Photo Lab. (5) Clean out the sewer system manhole directly downgradient from the Photo Lab. (6) Locate the source of contamination in the West Ditch Outfall. (7) Reconnect the two oil/water separators that discharge into the storm sewerage system. (8) Investigate the source of methylene chloride coming on the base. (9) Investigate the source of mercury at Fuel Cell Repair, building 7005.« less

  4. Supply Chain Sustainability Analysis of Fast Pyrolysis and Hydrotreating Bio-Oil to Produce Hydrocarbon Fuels

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Adom, Felix K.; Cai, Hao; Dunn, Jennifer B.

    2016-03-01

    The Department of Energy’s (DOE) Bioenergy Technology Office (BETO) aims at developing and deploying technologies to transform renewable biomass resources into commercially viable, high-performance biofuels, bioproducts and biopower through public and private partnerships (DOE, 2015). BETO and its national laboratory teams conduct in-depth techno-economic assessments (TEA) of technologies to produce biofuels. These assessments evaluate feedstock production, logistics of transporting the feedstock, and conversion of the feedstock to biofuel. There are two general types of TEAs. A design case is a TEA that outlines a target case for a particular biofuel pathway. It enables identification of data gaps and research andmore » development needs, and provides goals and targets against which technology progress is assessed. On the other hand, a state of technology (SOT) analysis assesses progress within and across relevant technology areas based on actual experimental results relative to technical targets and cost goals from design cases, and includes technical, economic, and environmental criteria as available.« less

  5. Elder Abuse FAQS

    MedlinePlus

    ... investigate potential elder abuse cases Caption: Multidisciplinary Team Technical Assistance Center (MDT TAC) Prev Play Pause Next ... Office of the Inspector General Open Government Plain Writing USA.gov BusinessUSA Footer Menu Justice First Column ...

  6. A multicentre observational study to evaluate a new tool to assess emergency physicians' non-technical skills.

    PubMed

    Flowerdew, Lynsey; Gaunt, Arran; Spedding, Jessica; Bhargava, Ajay; Brown, Ruth; Vincent, Charles; Woloshynowych, Maria

    2013-06-01

    To evaluate a new tool to assess emergency physicians' non-technical skills. This was a multicentre observational study using data collected at four emergency departments in England. A proportion of observations used paired observers to obtain data for inter-rater reliability. Data were also collected for test-retest reliability, observability of skills, mean ratings and dispersion of ratings for each skill, as well as a comparison of skill level between hospitals. Qualitative data described the range of non-technical skills exhibited by trainees and identified sources of rater error. 96 assessments of 43 senior trainees were completed. At a scale level, intra-class coefficients were 0.575, 0.532 and 0.419 and using mean scores were 0.824, 0.702 and 0.519. Spearman's ρ for calculating test-retest reliability was 0.70 using mean scores. All skills were observed more than 60% of the time. The skill Maintenance of Standards received the lowest mean rating (4.8 on a nine-point scale) and the highest mean was calculated for Team Building (6.0). Two skills, Supervision & Feedback and Situational Awareness-Gathering Information, had significantly different distributions of ratings across the four hospitals (p<0.04 and 0.007, respectively), and this appeared to be related to the leadership roles of trainees. This study shows the performance of the assessment tool is acceptable and provides valuable information to structure the assessment and training of non-technical skills, especially in relation to leadership. The framework of skills may be used to identify areas for development in individual trainees, as well as guide other patient safety interventions.

  7. Aerospace Systems Design in NASA's Collaborative Engineering Environment

    NASA Technical Reports Server (NTRS)

    Monell, Donald W.; Piland, William M.

    1999-01-01

    Past designs of complex aerospace systems involved an environment consisting of collocated design teams with project managers, technical discipline experts, and other experts (e.g. manufacturing and systems operations). These experts were generally qualified only on the basis of past design experience and typically had access to a limited set of integrated analysis tools. These environments provided less than desirable design fidelity, often lead to the inability of assessing critical programmatic and technical issues (e.g., cost risk, technical impacts), and generally derived a design that was not necessarily optimized across the entire system. The continually changing, modern aerospace industry demands systems design processes that involve the best talent available (no matter where it resides) and access to the best design and analysis tools. A solution to these demands involves a design environment referred to as collaborative engineering. The collaborative engineering environment evolving within the National Aeronautics and Space Administration (NASA) is a capability that enables the Agency's engineering infrastructure to interact and use the best state-of-the-art tools and data across organizational boundaries. Using collaborative engineering, the collocated team is replaced with an interactive team structure where the team members are geographically distributed and the best engineering talent can be applied to the design effort regardless of physical location. In addition, a more efficient, higher quality design product is delivered by bringing together the best engineering talent with more up-to-date design and analysis tools. These tools are focused on interactive, multidisciplinary design and analysis with emphasis on the complete life cycle of the system, and they include nontraditional, integrated tools for life cycle cost estimation and risk assessment. NASA has made substantial progress during the last two years in developing a collaborative engineering environment. NASA is planning to use this collaborative engineering infrastructure to provide better aerospace systems life cycle design and analysis, which includes analytical assessment of the technical and programmatic aspects of a system from "cradle to grave." This paper describes the recent NASA developments in the area of collaborative engineering, the benefits (realized and anticipated) of using the developed capability, and the long-term plans for implementing this capability across the Agency.

  8. Aerospace Systems Design in NASA's Collaborative Engineering Environment

    NASA Technical Reports Server (NTRS)

    Monell, Donald W.; Piland, William M.

    2000-01-01

    Past designs of complex aerospace systems involved an environment consisting of collocated design teams with project managers, technical discipline experts, and other experts (e.g., manufacturing and systems operation). These experts were generally qualified only on the basis of past design experience and typically had access to a limited set of integrated analysis tools. These environments provided less than desirable design fidelity, often lead to the inability of assessing critical programmatic and technical issues (e.g., cost, risk, technical impacts), and generally derived a design that was not necessarily optimized across the entire system. The continually changing, modern aerospace industry demands systems design processes that involve the best talent available (no matter where it resides) and access to the the best design and analysis tools. A solution to these demands involves a design environment referred to as collaborative engineering. The collaborative engineering environment evolving within the National Aeronautics and Space Administration (NASA) is a capability that enables the Agency's engineering infrastructure to interact and use the best state-of-the-art tools and data across organizational boundaries. Using collaborative engineering, the collocated team is replaced with an interactive team structure where the team members are geographical distributed and the best engineering talent can be applied to the design effort regardless of physical location. In addition, a more efficient, higher quality design product is delivered by bringing together the best engineering talent with more up-to-date design and analysis tools. These tools are focused on interactive, multidisciplinary design and analysis with emphasis on the complete life cycle of the system, and they include nontraditional, integrated tools for life cycle cost estimation and risk assessment. NASA has made substantial progress during the last two years in developing a collaborative engineering environment. NASA is planning to use this collaborative engineering engineering infrastructure to provide better aerospace systems life cycle design and analysis, which includes analytical assessment of the technical and programmatic aspects of a system from "cradle to grave." This paper describes the recent NASA developments in the area of collaborative engineering, the benefits (realized and anticipated) of using the developed capability, and the long-term plans for implementing this capability across Agency.

  9. Aerospace Systems Design in NASA's Collaborative Engineering Environment

    NASA Astrophysics Data System (ADS)

    Monell, Donald W.; Piland, William M.

    2000-07-01

    Past designs of complex aerospace systems involved an environment consisting of collocated design teams with project managers, technical discipline experts, and other experts (e.g., manufacturing and systems operations). These experts were generally qualified only on the basis of past design experience and typically had access to a limited set of integrated analysis tools. These environments provided less than desirable design fidelity, often led to the inability of assessing critical programmatic and technical issues (e.g., cost, risk, technical impacts), and generally derived a design that was not necessarily optimized across the entire system. The continually changing, modern aerospace industry demands systems design processes that involve the best talent available (no matter where it resides) and access to the best design and analysis tools. A solution to these demands involves a design environment referred to as collaborative engineering. The collaborative engineering environment evolving within the National Aeronautics and Space Administration (NASA) is a capability that enables the Agency's engineering infrastructure to interact and use the best state-of-the-art tools and data across organizational boundaries. Using collaborative engineering, the collocated team is replaced with an interactive team structure where the team members are geographically distributed and the best engineering talent can be applied to the design effort regardless of physical location. In addition, a more efficient, higher quality design product is delivered by bringing together the best engineering talent with more up-to-date design and analysis tools. These tools are focused on interactive, multidisciplinary design and analysis with emphasis on the complete life cycle of the system, and they include nontraditional, integrated tools for life cycle cost estimation and risk assessment. NASA has made substantial progress during the last two years in developing a collaborative engineering environment. NASA is planning to use this collaborative engineering infrastructure to provide better aerospace systems life cycle design and analysis, which includes analytical assessment of the technical and programmatic aspects of a system from "cradle to grave." This paper describes the recent NASA developments in the area of collaborative engineering, the benefits (realized and anticipated) of using the developed capability, and the long-term plans for implementing this capability across the Agency.

  10. NASA Work Breakdown Structure (WBS) Handbook

    NASA Technical Reports Server (NTRS)

    Fleming, Jon F.; Poole, Kenneth W.

    2016-01-01

    The purpose of this document is to provide program/project teams necessary instruction and guidance in the best practices for Work Breakdown Structure (WBS) and WBS dictionary development and use for project implementation and management control. This handbook can be used for all types of NASA projects and work activities including research, development, construction, test and evaluation, and operations. The products of these work efforts may be hardware, software, data, or service elements (alone or in combination). The aim of this document is to assist project teams in the development of effective work breakdown structures that provide a framework of common reference for all project elements. The WBS and WBS dictionary are effective management processes for planning, organizing, and administering NASA programs and projects. The guidance contained in this document is applicable to both in-house, NASA-led effort and contracted effort. It assists management teams from both entities in fulfilling necessary responsibilities for successful accomplishment of project cost, schedule, and technical goals. Benefits resulting from the use of an effective WBS include, but are not limited to: providing a basis for assigned project responsibilities, providing a basis for project schedule and budget development, simplifying a project by dividing the total work scope into manageable units, and providing a common reference for all project communication.

  11. Work Breakdown Structure (WBS) Handbook

    NASA Technical Reports Server (NTRS)

    2010-01-01

    The purpose of this document is to provide program/project teams necessary instruction and guidance in the best practices for Work Breakdown Structure (WBS) and WBS dictionary development and use for project implementation and management control. This handbook can be used for all types of NASA projects and work activities including research, development, construction, test and evaluation, and operations. The products of these work efforts may be hardware, software, data, or service elements (alone or in combination). The aim of this document is to assist project teams in the development of effective work breakdown structures that provide a framework of common reference for all project elements. The WBS and WBS dictionary are effective management processes for planning, organizing, and administering NASA programs and projects. The guidance contained in this document is applicable to both in-house, NASA-led effort and contracted effort. It assists management teams from both entities in fulfilling necessary responsibilities for successful accomplishment of project cost, schedule, and technical goals. Benefits resulting from the use of an effective WBS include, but are not limited to: providing a basis for assigned project responsibilities, providing a basis for project schedule development, simplifying a project by dividing the total work scope into manageable units, and providing a common reference for all project communication.

  12. Progress update on a 2015 USIP interdisciplinary undergraduate student microgravity experiment

    NASA Astrophysics Data System (ADS)

    Dove, A.; Colwell, J. E.; Brisset, J.; Kirstein, J.; Brightwell, K.; Hayden, R.; Jorges, J.; Schwartzberg, D.; Strange, J.; Yates, A.

    2016-12-01

    Our team was selected by the 2016 USIP program to build, fly, and analyze the results from a granular dynamics experiment that will fly in 2017 on a suborbital flight. The experiment will be designed to test technology and enable science relevant to low-gravity planetary objects, such as asteroids, comets, and small moons. Following on the success of previous NASA Flight Opportunities Program (FOP) and Undergraduate Student Instrumentation Project (USIP) projects, however, the primary driver of the project is to enable undergraduate student participation in the entire lifetime of a science and technology development project. Our mentoring team consists of faculty, postdoctoral researchers, and graduate students, who have experience with the past USIP program and similar projects, as well as with mentoring undergraduate students. The undergraduate team includes a diversity of major disciplines, including physics, mechanical/aerospace engineering, electrical engineering, business (accounting), and marketing. Each team member has specific project tasks, as outlined in the proposal, and all members will also help develop and participate in outreach events. In additional to their project roles, students will also be responsible for presentations and milestones, such as design reviews. Through these reviews and the outreach events, all team members have the chance to develop their technical and non-technical communication skills. Previous experience with the NASA USIP program demonstrated that students achieve significant growth through these projects -gaining a better understanding of the entire lifecycle of a project, and, likely more importantly, how to work with a diverse team. In this talk, we will discuss the status of the project, and present student impressions and thoughts on the project thus far.

  13. Regional operations research program for development of geothermal energy in the southwest United States. Final technical report, June 1977-August 1978

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Marlin, J.M.; Christ, R.; McDevitt, P.

    1979-01-01

    The efforts by the Core and State Teams in data acquisition, electric and non-electric economic studies, development of computer support functions and operations, and preparation of geothermal development scenarios are described. Team reports for the states of Arizona, Colorado, Nevada, New Mexico, and Utah are included in the appendices along with a summary of the state scenarios. (MHR)

  14. Interactive and Hands-on Methods for Professional Development of Undergraduate Researchers

    NASA Astrophysics Data System (ADS)

    Pressley, S. N.; LeBeau, J. E.

    2016-12-01

    Professional development workshops for undergraduate research programs can range from communicating science (i.e. oral, technical writing, poster presentations), applying for fellowships and scholarships, applying to graduate school, and learning about careers, among others. Novel methods of presenting the information on the above topics can result in positive outcomes beyond the obvious of transferring knowledge. Examples of innovative methods to present professional development information include 1) An interactive session on how to write an abstract where students are given an opportunity to draft an abstract from a short technical article, followed by discussion amongst a group of peers, and comparison with the "published" abstract. 2) Using the Process Oriented Guided Inquiry Learning (POGIL) method to evaluate and critique a research poster. 3) Inviting "experts" such as a Fulbright scholar graduate student to present on applying for fellowships and scholarships. These innovative methods of delivery provide more hands-on activities that engage the students, and in some cases (abstract writing) provide practice for the student. The methods also require that students develop team work skills, communicate amongst their peers, and develop networks with their cohort. All of these are essential non-technical skills needed for success in any career. Feedback from students on these sessions are positive and most importantly, the students walk out of the session with a smile on their face saying how much fun it was. Evaluating the impact of these sessions is more challenging and under investigation currently.

  15. A Technical History of the SEI

    DTIC Science & Technology

    2017-01-01

    service-oriented architecture concepts by leading a team of technical ex - perts from several Air Force financial management programs of record in...the application of computing, that trend re- versed dramatically in the 1970s for a variety of reasons, including the difficulty the DoD was ex ...implement it in programming languages other than Ada. The lessons learned from the testbed ex - periments were incorporated into a comprehensive guide

  16. The NASA Technical Report Server

    NASA Astrophysics Data System (ADS)

    Nelson, M. L.; Gottlich, G. L.; Bianco, D. J.; Paulson, S. S.; Binkley, R. L.; Kellogg, Y. D.; Beaumont, C. J.; Schmunk, R. B.; Kurtz, M. J.; Accomazzi, A.; Syed, O.

    The National Aeronautics and Space Act of 1958 established the National Aeronautics and Space Administration (NASA) and charged it to "provide for the widest practicable and appropriate dissemination of information concerning...its activities and the results thereof". The search for innovative methods to distribute NASA's information led a grass-roots team to create the NASA Technical Report Server (NTRS), which uses the World Wide Web and other popular Internet-based information systems .

  17. Mental Health Advisory Team-Korea (8th Army) Technical Report

    DTIC Science & Technology

    2016-06-30

    10 2.3 Comparison Groups for Analyses...10 2.4 Focus Groups ............................................................................................................... 11...46 8.7 Perceptions of Staffing Challenges: Survey and Focus Group Data .............................. 48 9 SOLDIER FOCUS GROUP SUMMARY

  18. Policy Environments That Draw Manufacturers and Create Jobs | State, Local,

    Science.gov Websites

    and Tribal Governments | NREL Policy Environments That Draw Manufacturers and Create Jobs Policy Environments That Draw Manufacturers and Create Jobs The Solar Technical Assistance Team (STAT

  19. Managing Challenges in a Multi Contractor Project

    NASA Technical Reports Server (NTRS)

    King, Ron

    2011-01-01

    The presentation provides a project description, describes the integrated product team, and review project challenges. The challenges include programmatic, technical, basic drop tests, heavy drop tests, C-17 envelope expansion, and Ares I-X.

  20. Streamlining Software Aspects of Certification: Report on the SSAC Survey

    NASA Technical Reports Server (NTRS)

    Hayhurst, Kelly J.; Dorsey, Cheryl A.; Knight, John C.; Leveson, Nancy G.; McCormick, G. Frank

    1999-01-01

    The aviation system now depends on information technology more than ever before to ensure safety and efficiency. To address concerns about the efficacy of software aspects of the certification process, the Federal Aviation Administration (FAA) began the Streamlining Software Aspects of Certification (SSAC) program. The SSAC technical team was commissioned to gather data, analyze results, and propose recommendations to maximize efficiency and minimize cost and delay, without compromising safety. The technical team conducted two public workshops to identify and prioritize software approval issues, and conducted a survey to validate the most urgent of those issues. The SSAC survey, containing over two hundred questions about the FAA's software approval process, reached over four hundred industry software developers, aircraft manufacturers, and FAA designated engineering representatives. Three hundred people responded. This report presents the SSAC program rationale, survey process, preliminary findings, and recommendations.

Top