DOT National Transportation Integrated Search
2014-05-01
A common issue during phased highway construction projects is the need to temporarily relocate : large guide signs on the roadside or install new guide signs for temporary use. The conventional concrete : foundations used for these signs are costly a...
Skid-mounted support system for temporary guide signs.
DOT National Transportation Integrated Search
2014-11-01
A common issue during phased highway construction projects is the need to temporarily relocate : large guide signs on the roadside or install new guide signs for temporary use. The conventional concrete : foundations used for these signs are costly a...
0-6782 : development of design standards for mounting temporary large guide signs.
DOT National Transportation Integrated Search
2014-08-01
A common issue during phased highway : construction projects is the need to temporarily : relocate large guide signs on the roadside or install : new guide signs for temporary use. Many of these : signs are larger than 100 ft2 in size and cannot be :...
75 FR 65365 - Disaster Temporary Housing Operational Guide
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-22
... DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency [Docket ID FEMA-2010-0062] Disaster Temporary Housing Operational Guide AGENCY: Federal Emergency Management Agency, DHS. ACTION: Notice of availability; request for comments. SUMMARY: The Federal Emergency Management Agency (FEMA) is...
19 CFR 210.52 - Motions for temporary relief.
Code of Federal Regulations, 2010 CFR
2010-04-01
....52 Customs Duties UNITED STATES INTERNATIONAL TRADE COMMISSION INVESTIGATIONS OF UNFAIR PRACTICES IN IMPORT TRADE ADJUDICATION AND ENFORCEMENT Temporary Relief § 210.52 Motions for temporary relief... issuance of temporary relief, the Commission will be guided by practice under Rule 65 of the Federal Rules...
Crash test and evaluation of temporary wood sign support system for large guide signs.
DOT National Transportation Integrated Search
2016-07-01
The objective of this research task was to evaluate the impact performance of a temporary wood sign support : system for large guide signs. It was desired to use existing TxDOT sign hardware in the design to the extent possible. : The full-scale cras...
ABE/Pre-Vocational Skills Program. A Teacher's Guide and Curriculum for Pre-Clerical Training.
ERIC Educational Resources Information Center
Johnson, Brenda J.
This manual is designed for teacher use for a 10-week course to prepare chronically unemployed adults to enter traditional clerical courses or job training programs offered by temporary-employment-agencies. The competency-based curriculum provides adults with basic skills in grammar, usage, reading, writing, listening, mathematics, keyboarding,…
75 FR 20868 - Notice of Issuance of Regulatory Guide
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-21
...: Nuclear Regulatory Commission. ACTION: Notice of Issuance and Availability of Regulatory Guide 1.68.2... Water-Cooled Nuclear Power Plants.'' FOR FURTHER INFORMATION CONTACT: Mark P. Orr, Regulatory Guide... Shutdown Capability for Water-Cooled Nuclear Power Plants,'' was issued with a temporary identification as...
The guided autobiography method: a learning experience.
Thornton, James E
2008-01-01
This article discusses the proposition that learning is an unexplored feature of the guided autobiography method and its developmental exchange. Learning, conceptualized and explored as the embedded and embodied processes, is essential in narrative activities of the guided autobiography method leading to psychosocial development and growth in dynamic, temporary social groups. The article is organized in four sections and summary. The first section provides a brief overview of the guided autobiography method describing the interplay of learning and experiencing in temporary social groups. The second section offers a limited review on learning and experiencing as processes that are essential for development, growth, and change. The third section reviews the small group activities and the emergence of the "developmental exchange" in the guided autobiography method. Two theoretical constructs provide a conceptual foundation for the developmental exchange: a counterpart theory of aging as development and collaborative-situated group learning theory. The summary recaps the main ideas and issues that shape the guided autobiography method as learning and social experience using the theme, "Where to go from here."
19 CFR 210.70 - Forfeiture or return of complainant's temporary relief bond.
Code of Federal Regulations, 2010 CFR
2010-04-01
... relief bond. 210.70 Section 210.70 Customs Duties UNITED STATES INTERNATIONAL TRADE COMMISSION INVESTIGATIONS OF UNFAIR PRACTICES IN IMPORT TRADE ADJUDICATION AND ENFORCEMENT Temporary Relief § 210.70... and the Commission will be guided by practice under Rule 65 of the Federal Rules of Civil Procedure...
2005-12-01
3-11 De Minimis Levels for Exemption from General Confonnity Rule Requirements...Confonnity Rule de minimis levels. Therefore, not No significant impact. Noise -------1---=c=--onsidered a significant impact. Temporary, short...required under state law. This combined element is intended to guide long-range growth and de - velopment in an orderly manner that protects the
76 FR 14108 - Notice of Issuance of Regulatory Guide
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-15
..., Revision 1, ``Control of Preheat Temperature for Welding of Low-Alloy Steel.'' FOR FURTHER INFORMATION... for Welding of Low-Alloy Steel,'' was issued with a temporary identification as Draft Regulatory Guide... implementing regulatory requirements related to the control of welding for low-alloy steel components during...
NASA Astrophysics Data System (ADS)
Sugawara, Hirotake; Yamamoto, Tappei
2016-09-01
In order to quantitatively evaluate the electron confinement effect of the confronting divergent magnetic fields (CDMFs) applied to an inductively coupled plasma, we analyzed the electron transfer between two regions divided by the separatrix of the CDMFs in Ar at 0.67 Pa at 300 K using a Monte Carlo method. A conventional transfer judgement was simply based on the electron passage across the separatrix from the upstream source region to the downstream diffusion region. An issue was an overestimation of the transfer due to temporary stay of electrons in the downstream region. Electrons may pass the downstream region during their gyration even in case they are effectively bound to the upstream region, where their guiding magnetic flux lines run. More than half of the transfers were temporary ones and such seeming transfers were relevantly excluded from the statistics by introducing a newly chosen criterion based on the passage of electron gyrocenters across the separatrix and collisional events in the downstream region. Simulation results showed a tendency that the ratio of the temporary transfers excluded was higher under stronger magnetic fields because of higher cyclotron frequency. Work supported by JSPS Kakenhi Grant Number 16K05626.
Protocol Handbook - A Guide for the Base Protocol Officer
1986-04-01
printed or otherwise impressed on paper napkins , boxes, or anythi-ng designed ftar temporary use and discard. Advertisitig s;Igns are not to be...colored cloth and napkins are fine and add to the setting of the luncheon. There should be a centerpiece, but no candles are used on luncheon tables. Th~e...time, place, dress, and occasion. They should be in the third person, in black ink with the date and time written completely. The dress is handwritten
ERIC Educational Resources Information Center
Louisiana State Dept. of Education, Baton Rouge. Bureau of Migrant Education.
This manual was written as a guide for state migrant education recruiters who need to be familiar with the nature of seasonal and temporary work performed by Louisiana's migrating agricultural workers and fishing industry laborers. It is intended to teach recruiters about the agricultural and fishing activities necessary for raising and harvesting…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Buecker, Arno; Neuerburg, Joerg; Schmitz-Rode, Thomas
1997-11-15
Purpose: To evaluate the feasibility of thrombus removal from temporary vena cava filters using a rheolytic thrombectomy device and to assess the embolization rate of this procedure. Methods: Five temporary vena cava filters together with porcine thrombi were placed in a vena cava flow model (semitranslucent silicone tube of 23 mm diameter, pulsatile flow at a mean flow rate of 4 L/min). A rheolytic thrombectomy system (Hydrolyser) was used with a 9 Fr guiding catheter to remove the clots. The effluent was passed through filters of different size and the amount of embolized particles as well as the remaining thrombusmore » were measured. Results: Thrombus removal rates ranged from 85% to 100%. Embolization rates between 47% and 60% were calculated for the different filters. Conclusion: The Hydrolyser is able to remove sufficiently high amounts of thrombus from temporary vena cava filters. However, the amount of embolized particles makes it impossible to utilize this method without special precautions against embolization.« less
Leader’s Guide to Crew Endurance
1997-08-01
Dwight Lindsey, Systems Safety Branch, USASC Ms. Betty Marcum, USASC, editor LOCAL REPRODUCTION IS AUTHORIZED AND ENCOURAGED Foreword Stress, fatigue...Avoid using hypnotics to induce sleep in soldiers who have been kept awake on stimulants (and vice versa). "* Stimulants are only a temporary solution
GUIDE TO TREATMENT TECHNOLOGIES FOR HAZARDOUS WASTES AT SUPERFUND SITES
Over the past fewyears, it has become increasinsly evident that land disposal of hazardous wastes is at least only a temporary solution for much of the wastes present at Superfund sites. The need for more Iong-term, permanent "treatment solutions as alternatives to land disposal ...
Homma, T; Takahara, S; Kimura, M; Kinase, S
2015-06-01
Radiation protection issues on preparedness and response for a severe nuclear accident are discussed in this paper based on the experiences following the accident at Fukushima Daiichi nuclear power plant. The criteria for use in nuclear emergencies in the Japanese emergency preparedness guide were based on the recommendations of International Commission of Radiological Protection (ICRP) Publications 60 and 63. Although the decision-making process for implementing protective actions relied heavily on computer-based predictive models prior to the accident, urgent protective actions, such as evacuation and sheltering, were implemented effectively based on the plant conditions. As there were no recommendations and criteria for long-term protective actions in the emergency preparedness guide, the recommendations of ICRP Publications 103, 109, and 111 were taken into consideration in determining the temporary relocation of inhabitants of heavily contaminated areas. These recommendations were very useful in deciding the emergency protective actions to take in the early stages of the Fukushima accident. However, some suggestions have been made for improving emergency preparedness and response in the early stages of a severe nuclear accident. © The Chartered Institution of Building Services Engineers 2014.
Vital Defenses: Social Support Appraisals of Black Grandmothers Parenting Grandchildren
ERIC Educational Resources Information Center
Stevenson, Michelle L.; Henderson, Tammy L.; Baugh, Eboni
2007-01-01
Guided by the conceptual frameworks of social support appraisal mechanisms and cultural variant perspectives, the reported experiences of 23 Black grandmothers parenting grandchildren who receive cash assistance under the current welfare program, Temporary Assistance to Needy Families (TANF), were used to integrate macro- and micro-level…
Vermeulen, Sylvia J; Anema, Johannes R; Schellart, Antonius JM; van Mechelen, Willem; van der Beek, Allard J
2009-01-01
Background In the past decade in activities aiming at return-to-work (RTW), there has been a growing awareness to change the focus from sickness and work disability to recovery and work ability. To date, this process in occupational health care (OHC) has mainly been directed towards employees. However, within the working population there are two vulnerable groups: temporary agency workers and unemployed workers, since they have no workplace/employer to return to, when sick-listed. For this group there is a need for tailored RTW strategies and interventions. Therefore, this paper aims to describe the structured and stepwise process of development, implementation and evaluation of a theory- and practise-based participatory RTW program for temporary agency workers and unemployed workers, sick-listed due to musculoskeletal disorders (MSD). This program is based on the already developed and cost-effective RTW program for employees, sick-listed due to low back pain. Methods The Intervention Mapping (IM) protocol was used to develop a tailor-made RTW program for temporary agency workers and unemployed workers, sick-listed due to MSD. The Attitude-Social influence-self-Efficacy (ASE) model was used as a theoretical framework for determinants of behaviour regarding RTW of the sick-listed worker and development of the intervention. To ensure participation and facilitate successful adoption and implementation, important stakeholders were involved in all steps of program development and implementation. Results of semi-structured interviews and 'fine-tuning' meetings were used to design the final participatory RTW program. Results A structured stepwise RTW program was developed, aimed at making a consensus-based RTW implementation plan. The new program starts with identifying obstacles for RTW, followed by a brainstorm session in which the sick-listed worker and the labour expert of the Social Security Agency (SSA) formulate solutions/possibilities for suitable (therapeutic) work. This process is guided by an independent RTW coordinator to achieve consensus. Based on the resulting RTW implementation plan, to create an actual RTW perspective, a vocational rehabilitation agency is assigned to find a matching (therapeutic) workplace. The cost-effectiveness of this participatory RTW program will be evaluated in a randomised controlled trial. Conclusion IM is a promising tool for the development of tailor-made OHC interventions for the vulnerable working population. PMID:19573229
ERIC Educational Resources Information Center
Child Care Bureau, 2004
2004-01-01
This publication was developed in conjunction with a special Tribal Cluster Training, "Collaboration and Accountability as Foundations for Success," held in Portland, Oregon on August 24-25, 2004. This Tribal Cluster Training is jointly sponsored by the Office of Family Assistance (OFA), which administers the Tribal Temporary Assistance…
76 FR 40943 - Notice of Issuance of Regulatory Guide
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-12
..., Revision 3, ``Criteria for Use of Computers in Safety Systems of Nuclear Power Plants.'' FOR FURTHER..., ``Criteria for Use of Computers in Safety Systems of Nuclear Power Plants,'' was issued with a temporary... Fuel Reprocessing Plants,'' to 10 CFR part 50 with regard to the use of computers in safety systems of...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-24
... with respect to auditors that issue audit reports only for brokers or dealers that do not receive... Corporation; and If the Board exempts any public accounting firm from such an inspection program, the auditor... inspections of relevant audits and auditors and provide a source of information to help guide decisions about...
WASHINGTON OPPORTUNITIES FOR WOMEN, A GUIDE TO PART-TIME WORK AND STUDY FOR THE EDUCATED WOMAN.
ERIC Educational Resources Information Center
WEISL, REYNA; AND OTHERS
EMPLOYMENT AND CONTINUING EDUCATION OPPORTUNITIES IN WASHINGTON ARE OUTLINED FOR COLLEGE EDUCATED WOMEN WHO HAVE LESSENING FAMILY RESPONSIBILITIES AND WANT TO RETURN TO SCHOOL, DISCOVER NEW AREAS OF VOLUNTEER SERVICE, OR FIND A SUITABLE PART-TIME OR TEMPORARY JOB. PAID AND VOLUNTEER JOBS IN GOVERNMENT, THE ARTS, LANGUAGES, LIBRARIANSHIP, HEALTH…
From Welfare to Work: Lessons for ESL Learners.
ERIC Educational Resources Information Center
Green, Elaine
This lesson plan guide is designed to be used by English-as-a-Second-Language (ESL) teachers to help their learners deal with new welfare legislation--Temporary Assistance to Needy Families (TANF)--and to prepare them for the world of work. Learners at the high beginner to low intermediate level and above will benefit from this instruction. All…
Impulse noise trauma during army weapon firing.
Munjal, K R; Singh, V P
1997-04-01
A 100 infanty personnel firing modern weapons such as the Anti Tank Guided Missile, 106mm Recoiless Gun (RCL), 84mm Rocket Launcher (RL) and 81mm Mortar were studied for the effect of impulse noise on the ear and the evolution of the Temporary Threshold Shift (TTS), Recovery Time (RT) and Permanent Threshold Shift (PTS) was traced.
Incidence and impact of dog attacks on guide dogs in the UK: an update.
Moxon, R; Whiteside, H; England, G C W
2016-04-09
Data on dog attacks on Guide Dogs' stock were reviewed to investigate the characteristics of the attacks. An average of 11.2 attacks occurred each month. Nearly all of the attacks occurred in public areas, 68.4 per cent of victim dogs were qualified guide dogs and 55.5 per cent of victim dogs were working in harness when they were attacked. Guide Dogs' stock were injured in 43.2 per cent of attacks and veterinary costs for attacks were estimated at £34,514.30. Over 40 per cent of qualified guide dogs' working ability was affected and >20 per cent of qualified guide dogs required some time off from working after a dog attack. Twenty dogs were permanently withdrawn from the Guide Dogs' programme as a result of dog attacks, 13 of which were qualified and working with guide dog owners at the time of the withdrawal; this resulted in a financial cost of >£600,000 to the charity. More importantly perhaps, temporary and permanent withdrawals have a significant impact upon the mobility and independence of guide dog owners and in many cases significantly impacted their emotional well-being. British Veterinary Association.
Kendall, W.L.; Nichols, J.D.; Hines, J.E.
1997-01-01
Statistical inference for capture-recapture studies of open animal populations typically relies on the assumption that all emigration from the studied population is permanent. However, there are many instances in which this assumption is unlikely to be met. We define two general models for the process of temporary emigration, completely random and Markovian. We then consider effects of these two types of temporary emigration on Jolly-Seber (Seber 1982) estimators and on estimators arising from the full-likelihood approach of Kendall et al. (1995) to robust design data. Capture-recapture data arising from Pollock's (1982) robust design provide the basis for obtaining unbiased estimates of demographic parameters in the presence of temporary emigration and for estimating the probability of temporary emigration. We present a likelihood-based approach to dealing with temporary emigration that permits estimation under different models of temporary emigration and yields tests for completely random and Markovian emigration. In addition, we use the relationship between capture probability estimates based on closed and open models under completely random temporary emigration to derive three ad hoc estimators for the probability of temporary emigration, two of which should be especially useful in situations where capture probabilities are heterogeneous among individual animals. Ad hoc and full-likelihood estimators are illustrated for small mammal capture-recapture data sets. We believe that these models and estimators will be useful for testing hypotheses about the process of temporary emigration, for estimating demographic parameters in the presence of temporary emigration, and for estimating probabilities of temporary emigration. These latter estimates are frequently of ecological interest as indicators of animal movement and, in some sampling situations, as direct estimates of breeding probabilities and proportions.
Nätti, Jouko; Kinnunen, Ulla; Mäkikangas, Anne; Mauno, Saija
2009-04-01
The study investigated the relationship between the type of employment (permanent/temporary) contract and mortality. Factors through which temporary employment was expected to be associated with increased mortality were the degree of satisfaction with the uncertainty related to temporary work situation (Study 1) and the voluntary/involuntary basis for temporary work (Study 2). In Study 1 the data consisted of representative survey on Finnish employees in 1984 (n = 4502), which was merged with register-based follow-up data in Statistics Finland covering years 1985-2000. In Study 2 the data consisted of representative survey on Finnish employees in 1990 (n = 3502) with register-based follow-up data covering years 1991-2000. The relative risk of death was examined by conducting Cox proportional hazards analyses for the permanent and the two temporary employment groups, respectively. In Study 1 temporary employees feeling the insecure situation unsatisfactory had a 1.95-fold higher risk of mortality than permanent employees (95% CI 1.13-3.35) after adjusted for background, health- and work-related factors. In Study 2 employees in the position of having a temporary job on the involuntarily basis had a 2.59-fold higher risk of mortality than permanent employees (95% CI 1.16-5.80). The present study confirmed that temporary employees are not a homogeneous group, which holds true even for mortality. Those temporary employees, who either felt the insecure situation unsatisfactory or who worked in temporary work involuntarily, had higher risk of mortality than permanent employees.
Certified: A Citizen's Step-by-Step Guide to Protecting Vernal Pools. 6th Edition.
ERIC Educational Resources Information Center
Colburn, Elizabeth A., Ed.
The objective of this manual is to train volunteers in the process of identifying vernal pool habitat so that as many of these pools as possible can be certified by the Massachusetts Natural Heritage and Endangered Species Program. Vernal pools are a kind of temporary pond in which salamanders and other animals breed. The pools are unique…
Maquiladoras and National Security: Design Theory as a Guide
2011-10-25
created in 1964 when the Mexican government established the Border Industrialization Program. Previously, under the Bracero program , large numbers...valve” for the Mexican economy in terms of unemployment. Previously, under the Bracero program , Mexican laborers were allowed temporary entry into...the United States to pursue seasonal labor opportunities. A guest worker program, perhaps modeled after the Bracero program that was discontinued in
Shang, Xiaoke; Lu, Rong; Dong, Nianguo
2018-06-20
This is the first attempt to use a temporary occluder to close a giant perimembranous ventricular septal defect (32 mm), which obtains clinical evidence of good haemodynamics in patients with severe pulmonary hypertension. This may provide an alternative assessment to guide cardiac surgeons in determining a definitive treatment.
Kim, Min-Su; Kim, Go-Woon; Rho, Young-Soo; Kwon, Kee-Hwan; Chung, Eun-Jae
2017-05-01
This retrospective study was carried out to investigate the effectiveness and safety of office-based electromyography-guided injection of botulinum toxin in the cricopharyngeus muscle of patients who did not show upper esophageal sphincter passage in a swallowing study in spite of maximal swallowing rehabilitation. Thirty-six patients who showed no or limited ability to oral feed after maximum swallowing rehabilitation were enrolled. Video fluoroscopic swallowing study, flexible endoscopic evaluation of swallowing, disability rating scale, penetration aspiration score, and National Institutes of Health swallowing safety scale were used in the evaluation of dysphagia. Success was defined as nondependence on gastrostomy for patients who previously were dependent on gastrostomy and improvement in disability rating scale score after botulinum toxin injections. The total success rate was 63.9%. The complication rate was very low, with only 1 patient showing temporary unilateral vocal fold paralysis. Botulinum toxin injection was more effective in patients with cranial nerve IX or X palsy than in those without it ( P = .006). This procedure can be a simple, safe, and effective tool in patients with cricopharyngeal dysfunction after swallowing rehabilitation, especially for cranial nerve IX or X palsy.
Improving health services to displaced persons in Aceh, Indonesia: a balanced scorecard.
Chan, Grace J; Parco, Kristin B; Sihombing, Melva E; Tredwell, Susan P; O'Rourke, Edward J
2010-09-01
After the Indian Ocean tsunami in December 2004, the International Organization for Migration constructed temporary health clinics to provide medical services to survivors living in temporary accommodation centres throughout Aceh, Indonesia. Limited resources, inadequate supervision, staff turnover and lack of a health information system made it challenging to provide quality primary health services. A balanced scorecard was developed and implemented in collaboration with local health clinic staff and district health officials. Performance targets were identified. Staff collected data from clinics and accommodation centres to develop 30 simple performance measures. These measures were monitored periodically and discussed at meetings with stakeholders to guide the development of health interventions. Two years after the tsunami, 34 000 displaced persons continued to receive services from temporary health clinics in two districts of Aceh province. From March to December 2007, the scorecard was implemented in seven temporary health clinics. Interventions stimulated and tracked by the scorecard showed measurable improvements in preventive medicine, child health, capacity building of clinic staff and availability of essential drugs. By enhancing communication, the scorecard also led to qualitative benefits. The balanced scorecard is a practical tool to focus attention and resources to facilitate improvement in disaster rehabilitation settings where health information infrastructure is poor. Introducing a mechanism for rapid improvement fostered communication between nongovernmental organizations, district health officials, clinic health workers and displaced persons.
Moscarello, J M; Ben-Shahar, O; Ettenberg, A
2010-10-13
Goal-directed behavior is governed by internal physiological states and external incentives present in the environment (e.g. hunger and food). While the role of the mesocorticolimbic dopamine (DA) system in behavior guided by environmental incentives has been well studied, the effect of relevant physiological states on the function of this system is less understood. The current study examined the role of the medial prefrontal cortex (mPFC) and the nucleus accumbens (NAcc) in the kind of food-reinforced behaviors known to be sensitive to the internal state produced by food deprivation conditions. Operant lever-press reinforced on fixed ratio 1 (FR1) and progressive ratio (PR) schedules was tested after temporary inactivation of, or DA receptor blockade in, the prelimbic mPFC or NAcc core of rats with differing levels of food deprivation (0, 12 and 36-h). Food deprivation increased PR breakpoints, as well as the number of lever-presses emitted on the FR1 schedule. Both temporary inactivation and DA blockade of NAcc reduced breakpoints across deprivation conditions, while temporary inactivation and DA blockade of mPFC reduced breakpoints only in food-deprived rats. Neither manipulation of mPFC and NAcc had any effect on behavior reinforced on the FR1 schedule. Thus, mPFC and NAcc were differentially relevant to the behaviors tested-NAcc was recruited when the behavioral cost per reinforcer was rising or high regardless of food deprivation conditions, while mPFC was recruited when food-deprived animals behaved through periods of sparse reinforcement density in order to maximize available gain. Copyright 2010 IBRO. Published by Elsevier Ltd. All rights reserved.
ERIC Educational Resources Information Center
Bozeman, Karl
A program and related materials for providing child care free of charge in the aftermath of widespread disaster to children ranging in age from infancy through second grade are described in this guidebook. In Section I, the Temporary Emergency Child Care (TECC) program is discussed. In particular, the nature of TECC services is indicated, the…
ERIC Educational Resources Information Center
Dougherty, Susan
Noting that over the last decade, the role of a foster parent has evolved from temporary caregiver to essential part of a professional team in determining the best long-term plan for children in their care, this guide focuses on practical ways in which best child welfare practice can be incorporated into the recruitment, training, and support of…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-15
... Commission and is available for public inspection: a. Application Type: Request for drought-based temporary... that resource agency. k. Description of Request: Alabama Power is requesting a drought- based temporary...
Effect of temporary cements on the shear bond strength of luting cements
FIORI-JÚNIOR, Marco; MATSUMOTO, Wilson; SILVA, Raquel Assed Bezerra; PORTO-NETO, Sizenando Toledo; SILVA, Jaciara Miranda Gomes
2010-01-01
Objective The purpose of this study was to evaluate, by shear bond strength (SBS) testing, the influence of different types of temporary cements on the final cementation using conventional and self-etching resin-based luting cements. Material and Methods Forty human teeth divided in two halves were assigned to 8 groups (n=10): I and V (no temporary cementation); II and VI: Ca(OH)2-based cement; III and VII: zinc oxide (ZO)based cement; IV and VIII: ZO-eugenol (ZOE)-based cement. Final cementation was done with RelyX ARC cement (groups I to IV) and RelyX Unicem cement (groups V to VIII). Data were analyzed statistically by ANOVA and Tukey's test at 5% significance level. Results Means were (MPa): I - 3.80 (±1.481); II - 5.24 (±2.297); III - 6.98 (±1.885); IV - 6.54 (±1.459); V - 5.22 (±2.465); VI - 4.48 (±1.705); VII - 6.29 (±2.280); VIII - 2.47 (±2.076). Comparison of the groups that had the same temporary cementation (Groups II and VI; III and VII; IV and VIII) showed statistically significant difference (p<0.001) only between Groups IV and VIII, in which ZOE-based cements were used. The use of either Ca(OH)2 based (Groups II and VI) or ZO-based (Groups III and VII) cements showed no statistically significant difference (p>0.05) for the different luting cements (RelyXTM ARC and RelyXTM Unicem). The groups that had no temporary cementation (Groups I and V) did not differ significantly from each other either (p>0.05). Conclusion When temporary cementation was done with ZO- or ZOE-based cements and final cementation was done with RelyX ARC, there was an increase in the SBS compared to the control. In the groups cemented with RelyX Unicem, however, the use of a ZOE-based temporary cement affected negatively the SBS of the luting agent used for final cementation. PMID:20379679
Rawson, Joey; Siade, Adam; Sun, Jing; Neidhardt, Harald; Berg, Michael; Prommer, Henning
2017-08-01
Over the last few decades, significant progress has been made to characterize the extent, severity, and underlying geochemical processes of groundwater arsenic (As) pollution in S/SE Asia. However, comparably little effort has been made to merge the findings into frameworks that allow for a process-based quantitative analysis of observed As behavior and for predictions of its long-term fate. This study developed field-scale numerical modeling approaches to represent the hydrochemical processes associated with an in situ field injection of reactive organic carbon, including the reductive dissolution and transformation of ferric iron (Fe) oxides and the concomitant release of sorbed As. We employed data from a sucrose injection experiment in the Bengal Delta Plain to guide our model development and to constrain the model parametrization. Our modeling results illustrate that the temporary pH decrease associated with the sucrose transformation and mineralization caused pronounced, temporary shifts in the As partitioning between aqueous and sorbed phases. The results also suggest that while the reductive dissolution of Fe(III) oxides reduced the number of sorption sites, a significant fraction of the released As was rapidly scavenged through coprecipitation with neo-formed magnetite. These secondary reactions can explain the disparity between the observed Fe and As behavior.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-09
... determination will be made based upon the analysis of the effects of temporary road construction and use. The... Management Plan To Comply With a District of Montana Court Order (Temporary Roads) AGENCY: Forest Service... support, if possible, its decision to exclude temporary roads from the road density objectives...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-07
... drought-based temporary variance of the Martin Project rule curve and minimum flow releases at the Yates... requesting a drought- based temporary variance to the Martin Project rule curve. The rule curve variance...
Strategic planning for post-disaster temporary housing.
Johnson, Cassidy
2007-12-01
Temporary housing programmes suffer from excessively high cost, late delivery, poor location, improper unit designs and other inherent issues. These issues can be attributed in part to a prevalence of ad hoc tactical planning, rather than pre-disaster strategic planning, for reconstruction undertaken by governments and non-governmental organisations (NGOs) in the chaotic post-disaster environment. An analysis of the process and outcomes from six case studies of temporary housing programmes after disasters in Turkey and Colombia in 1999, Japan in 1995, Greece in 1986, Mexico in 1985, and Italy in 1976 yields information about the extent to which strategic planning is employed in temporary housing programmes, as well as common issues in temporary housing. Based on an understanding of these common issues, this paper proposes a framework for strategic planning for temporary housing that identifies organisational designs and available resources for temporary housing before the disaster, but allows modifications to fit the specific post-disaster situation.
2009-12-01
reasonable suspicion, this action triggers a responsibility to diligently develop probable cause with regard to the seized property.17 Once...Amendment prohibits only ‘meaningful interference’ with a person’s possessory interests, not Government action which is reasonable under the...tempered this standard by observing that while the police could have acted more expeditiously, their actions were reasonably diligent, because they
Designing Temporary Systems: Exploring Local School Improvement Intentions in the Swedish Context
ERIC Educational Resources Information Center
Nordholm, Daniel; Blossing, Ulf
2014-01-01
This article targets local school improvement in Sweden and temporary systems as a model to organize improvement work. These data are based on a qualitative case study of teacher groups constituting a temporary system representing the different subjects in comprehensive school in a medium-sized urban municipality. A total of eight interviews were…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-14
... for drought-based temporary variance of the reservoir elevations and minimum flow releases at the Dead... temporary variance to the reservoir elevation and minimum flow requirements at the Hoist Development. The...: (1) Releasing a minimum flow of 75 cubic feet per second (cfs) from the Hoist Reservoir, instead of...
Improving health services to displaced persons in Aceh, Indonesia: a balanced scorecard
Parco, Kristin B; Sihombing, Melva E; Tredwell, Susan P; O'Rourke, Edward J
2010-01-01
Abstract Problem After the Indian Ocean tsunami in December 2004, the International Organization for Migration constructed temporary health clinics to provide medical services to survivors living in temporary accommodation centres throughout Aceh, Indonesia. Limited resources, inadequate supervision, staff turnover and lack of a health information system made it challenging to provide quality primary health services. Approach A balanced scorecard was developed and implemented in collaboration with local health clinic staff and district health officials. Performance targets were identified. Staff collected data from clinics and accommodation centres to develop 30 simple performance measures. These measures were monitored periodically and discussed at meetings with stakeholders to guide the development of health interventions. Local setting Two years after the tsunami, 34 000 displaced persons continued to receive services from temporary health clinics in two districts of Aceh province. From March to December 2007, the scorecard was implemented in seven temporary health clinics. Relevant changes Interventions stimulated and tracked by the scorecard showed measurable improvements in preventive medicine, child health, capacity building of clinic staff and availability of essential drugs. By enhancing communication, the scorecard also led to qualitative benefits. Lessons learnt The balanced scorecard is a practical tool to focus attention and resources to facilitate improvement in disaster rehabilitation settings where health information infrastructure is poor. Introducing a mechanism for rapid improvement fostered communication between nongovernmental organizations, district health officials, clinic health workers and displaced persons. PMID:20865077
Safety evaluation of the temporary consolidant based on a zebrafish embryo model.
Zhang, Lu; Zhang, Xiao Yan; Hu, Yulan; Zhang, Bing Jian
2018-05-07
Temporary consolidants, such as cyclododecane, menthol, coumarin, and ethyl maltol, are proved to be effective for urgent conservation in archaeological field. However, the safety of these temporary consolidants is still unknown although they are always heavily used in archaeological field. Thus reports on the toxicity of these temporary consolidants are limited. Here, a zebrafish model was used for safety evaluation of these four temporary consolidants. In the present study, four temporary consolidants, including cyclododecane, menthol, coumarin, and ethyl maltol, at different concentrations were incubated with zebrafish embryos, and their biological toxic effects were firstly evaluated. It was shown that embryo exposure to temporary consolidants resulted in an increased mortality and malformation rate, and a decreased hatching rate. The order of embryo toxicity of the four types of temporary consolidants tested was menthol > coumarin > ethyl maltol > cyclododecane. Although the embryo toxicity of cyclododecane was minimal, some studies have indicated that this temporary consolidant could be bioaccumulated. The results also suggested that the zebrafish embryos can serve as a reliable model for the evaluation of embryo toxicity of temporary consolidants, as this model could offer the possibility to perform the rapid, medium throughput, cost-effective analyses. Copyright © 2018 Elsevier Ltd. All rights reserved.
NASA Astrophysics Data System (ADS)
Gallart, F.; Prat, N.; García-Roger, E. M.; Latron, J.; Rieradevall, M.; Llorens, P.; Barberá, G. G.; Brito, D.; de Girolamo, A. M.; Lo Porto, A.; Neves, R.; Nikolaidis, N. P.; Perrin, J. L.; Querner, E. P.; Quiñonero, J. M.; Tournoud, M. G.; Tzoraki, O.; Froebrich, J.
2011-10-01
Temporary streams are those water courses that undergo the recurrent cessation of flow or the complete drying of their channel. The biological communities in temporary stream reaches are strongly dependent on the temporal changes of the aquatic habitats determined by the hydrological conditions. The use of the aquatic fauna structural and functional characteristics to assess the ecological quality of a temporary stream reach can not therefore be made without taking into account the controls imposed by the hydrological regime. This paper develops some methods for analysing temporary streams' aquatic regimes, based on the definition of six aquatic states that summarize the sets of mesohabitats occurring on a given reach at a particular moment, depending on the hydrological conditions: flood, riffles, connected, pools, dry and arid. We used the water discharge records from gauging stations or simulations using rainfall-runoff models to infer the temporal patterns of occurrence of these states using the developed aquatic states frequency graph. The visual analysis of this graph is complemented by the development of two metrics based on the permanence of flow and the seasonal predictability of zero flow periods. Finally, a classification of the aquatic regimes of temporary streams in terms of their influence over the development of aquatic life is put forward, defining Permanent, Temporary-pools, Temporary-dry and Episodic regime types. All these methods were tested with data from eight temporary streams around the Mediterranean from MIRAGE project and its application was a precondition to assess the ecological quality of these streams using the current methods prescribed in the European Water Framework Directive for macroinvertebrate communities.
47 CFR 90.137 - Applications for operation at temporary locations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... evidence of frequency coordination. (b) When any unit or units of a base station or fixed station which are... Applications for operation at temporary locations. (a) An application for authority to operate a base or a... the following: (1) When one or more individual transmitters are to be operated by a licensee as a base...
Spacesuit Radiation Shield Design Methods
NASA Technical Reports Server (NTRS)
Wilson, John W.; Anderson, Brooke M.; Cucinotta, Francis A.; Ware, J.; Zeitlin, Cary J.
2006-01-01
Meeting radiation protection requirements during EVA is predominantly an operational issue with some potential considerations for temporary shelter. The issue of spacesuit shielding is mainly guided by the potential of accidental exposure when operational and temporary shelter considerations fail to maintain exposures within operational limits. In this case, very high exposure levels are possible which could result in observable health effects and even be life threatening. Under these assumptions, potential spacesuit radiation exposures have been studied using known historical solar particle events to gain insight on the usefulness of modification of spacesuit design in which the control of skin exposure is a critical design issue and reduction of blood forming organ exposure is desirable. Transition to a new spacesuit design including soft upper-torso and reconfigured life support hardware gives an opportunity to optimize the next generation spacesuit for reduced potential health effects during an accidental exposure.
Credit BG. Interior view of the building displays temporary wooden ...
Credit BG. Interior view of the building displays temporary wooden building construction, pump, and water piping arrangements. The well is currently used as an observation post for changes in ground water levels - Edwards Air Force Base, North Base, Well No. 2, East of Second Street, Boron, Kern County, CA
PC based temporary shielding administrative procedure (TSAP)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Olsen, D.E.; Pederson, G.E.; Hamby, P.N.
1995-03-01
A completely new Administrative Procedure for temporary shielding was developed for use at Commonwealth Edison`s six nuclear stations. This procedure promotes the use of shielding, and addresses industry requirements for the use and control of temporary shielding. The importance of an effective procedure has increased since more temporary shielding is being used as ALARA goals become more ambitious. To help implement the administrative procedure, a personal computer software program was written to incorporate the procedural requirements. This software incorporates the useability of a Windows graphical user interface with extensive help and database features. This combination of a comprehensive administrative proceduremore » and user friendly software promotes the effective use and management of temporary shielding while ensuring that industry requirements are met.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-22
... Econ. Dep't, Bank for Int'l Settlements, Triennial and Semiannual Surveys--Positions in Global Over-the...-Based Swap Data Repository Registration, Duties, and Core Principles, 75 FR 77305 (Dec. 10, 2010..., duties, and core principles for SB SEFs. See Registration and Regulation of Security-Based Swap Execution...
birgHPC: creating instant computing clusters for bioinformatics and molecular dynamics.
Chew, Teong Han; Joyce-Tan, Kwee Hong; Akma, Farizuwana; Shamsir, Mohd Shahir
2011-05-01
birgHPC, a bootable Linux Live CD has been developed to create high-performance clusters for bioinformatics and molecular dynamics studies using any Local Area Network (LAN)-networked computers. birgHPC features automated hardware and slots detection as well as provides a simple job submission interface. The latest versions of GROMACS, NAMD, mpiBLAST and ClustalW-MPI can be run in parallel by simply booting the birgHPC CD or flash drive from the head node, which immediately positions the rest of the PCs on the network as computing nodes. Thus, a temporary, affordable, scalable and high-performance computing environment can be built by non-computing-based researchers using low-cost commodity hardware. The birgHPC Live CD and relevant user guide are available for free at http://birg1.fbb.utm.my/birghpc.
Progressive forest canopy water loss during the 2012-2015 California drought.
Asner, Gregory P; Brodrick, Philip G; Anderson, Christopher B; Vaughn, Nicholas; Knapp, David E; Martin, Roberta E
2016-01-12
The 2012-2015 drought has left California with severely reduced snowpack, soil moisture, ground water, and reservoir stocks, but the impact of this estimated millennial-scale event on forest health is unknown. We used airborne laser-guided spectroscopy and satellite-based models to assess losses in canopy water content of California's forests between 2011 and 2015. Approximately 10.6 million ha of forest containing up to 888 million large trees experienced measurable loss in canopy water content during this drought period. Severe canopy water losses of greater than 30% occurred over 1 million ha, affecting up to 58 million large trees. Our measurements exclude forests affected by fire between 2011 and 2015. If drought conditions continue or reoccur, even with temporary reprieves such as El Niño, we predict substantial future forest change.
The Client Company Marginally Utilises the Knowledge of Highly Skilled Temporary Staff
ERIC Educational Resources Information Center
Augustsson, Gunnar
2016-01-01
This study is based on the presumption that there is often an underuse of temporary staff in client companies (CC) with highly skilled professionals. The study combines theories of the flexible organisation and a sociocultural perspective on learning within the framework of an inter-organisational context. The data are based partly on 17…
[Job satisfaction, volition and reasons for choice of temporary work].
Muzzolon, Cristina; Spoto, Andrea; Vidotto, Giulio
2012-01-01
In this paper, we reviewed the literature on volition and the principal studies on the reasons for choosing temporary work, which explain in more details how voluntary/involuntary status is interpreted. The description of a research, based on a sample of 1979 workers, is presented with two aims: 1. confirm a structural model that examines the effects on satisfaction of some variables, such as motivation and trust; 2. evaluate the influence of volition and reasons for choosing a temporary employment on job satisfaction. The results confirm the plausibility of the proposed structural model and show interesting results regarding the reasons for choosing temporary work.
Pozzi, A; Tallarico, M; Barlattani, A
2012-06-01
The aim of the study was to describe an unusual method to stabilize the surgical template during the treatment of a severely resorbed edentulous mandible by means of computer-guided implant surgery. Pre-operative computer-based planning revealed the difficulty to stabilize the surgical template in a 67-year-old healthy woman. A deviation of the original NobelGuide™ protocol was performed to ensure the stability of the surgical template: four anchor pins were used to stabilize the surgical template, two in the buccal side of the anterior template and two unusual pins were placed in the lingual site. Four straight TiUnite® Nobel Biocare™ implants were then placed, according to a modified All-on-4™ concept procedure, to avoid graft procedures and to reduce the cumulative chair-side treatment time and costs. A temporary restoration was placed immediately after implant placement. Three months later a definitive, full acrylic restoration was delivered.
Ha, Seung-Ryong; Yang, Jae-Ho; Lee, Jai-Bong; Han, Jung-Suk; Kim, Sung-Hun
2010-03-01
The purpose of this study was to investigate the diametral tensile strength of polymer-based temporary crown and fixed partial denture (FPD) materials, and the change of the diametral tensile strength with time. One monomethacrylate-based temporary crown and FPD material (Trim) and three dimethacrylate-based ones (Protemp 3 Garant, Temphase, Luxtemp) were investigated. 20 specimens (ø 4 mm × 6 mm) were fabricated and randomly divided into two groups (Group I: Immediately, Group II: 1 hour) according to the measurement time after completion of mixing. Universal Testing Machine was used to load the specimens at a cross-head speed of 0.5 mm/min. The data were analyzed using one-way ANOVA, the multiple comparison Scheffe test and independent sample t test (α = 0.05). Trim showed severe permanent deformation without an obvious fracture during loading at both times. There were statistically significant differences among the dimethacrylate-based materials. The dimethacrylate-based materials presented an increase in strength from 5 minutes to 1 hour and were as follows: Protemp 3 Garant (23.16 - 37.6 MPa), Temphase (22.27 - 28.08 MPa), Luxatemp (14.46 - 20.59 MPa). Protemp 3 Garant showed the highest value. The dimethacrylate-based temporary materials tested were stronger in diametral tensile strength than the monomethacrylate-based one. The diametral tensile strength of the materials investigated increased with time.
Ballesteros Polo, Mónica; Serra Pujadas, Consol; Miguel Martínez, José; Plana Almuni, Manel; Delclos, George L; Benavides, Fernando G
2009-01-01
Sickness absence due to non work-related conditions is a major public health issue with important socio-economic implications, and is not homogenously distributed in Spain. The objective of this study is to compare cost differences of temporary sickness absence between Barcelona and Madrid. A study was carried out based on incident cases of temporary sickness absence of more than fifteen days of duration, followed to case closure, in a retrospective cohort of workers in 2006. The study population consisted of workers of companies covered by the general regime of the Social Security System, and managed by an insurance company based in the provinces of Barcelona and Madrid in the year 2006. We compared the incidence, median duration and daily income base between Barcelona and Madrid, adjusting by sex, age and economic sector, using statistical models that take into account recurrent events in the period. 24.527 cases of temporary sickness absence were identified, 62% of which originated in Barcelona. The mean cost was 33% higher in Barcelona with respect to Madrid (2.589 euros vs 1941 euros). The incidence was 22% higher in Barcelona than Madrid (1,22, IC95%: 1,10-1,36) and mean daily income base per episode was 7,80 euros higher (IC95% :7,20-8,40). In the duration the time ratio was: 1,03 ( IC95%: 1,01-1,05). The higher incidence and daily income base of temporary sickness absence in Barcelona with respect to Madrid may explain the higher costs observed in the former.
Meng, Qi; Sun, Yang; Kang, Jian
2017-12-01
The sound environment and acoustic perception of open-air markets, which are very common in high-density urban open spaces, play important roles in terms of the urban soundscape. Based on objective and subjective measurements of a typical temporary open-air market in Harbin city, China, the effects of the temporary open-air market on the sound environment and acoustic perception were studied, considering different crowd densities. It was observed that a temporary open-air market without zoning increases the sound pressure level and subjective loudness by 2.4dBA and 0.21dBA, respectively, compared to the absence of a temporary market. Different from the sound pressure level and subjective loudness, the relationship between crowd density and the perceived acoustic comfort is parabolic. Regarding the effect of a temporary open-air market with different zones on the sound environment and acoustic perception, when the crowd densities were the same, subjective loudness in the fruit and vegetable sales area was always higher than in the food sales area and the clothing sales area. In terms of acoustic comfort, with an increase in crowd density, acoustic comfort in the fruit and vegetable sales area decreased, and acoustic comfort in the food sales area and the clothing sales area exhibited a parabolic change trend of increase followed by decrease. Overall, acoustic comfort can be effectively improved by better planning temporary open-air markets in high-density urban open spaces. Copyright © 2017 Elsevier B.V. All rights reserved.
Data Center Energy Efficiency Measurement Assessment Kit Guide and Specification
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
2012-10-26
A portable and temporary wireless mesh assessment kit can be used to speed up and reduce the costs of a data center energy use assessment and overcome the issues with respect to shutdowns. The assessment kit is comprised of temperature, relative humidity, and pressure sensors. Also included are power meters that can be installed on computer room air conditioners (CRACs) without intrusive interruption of data center operations. The assessment kit produces data required for a detailed energy assessment of the data center.
Ayuso, Mercedes; Bermúdez, Lluís; Santolino, Miguel
2016-04-01
The analysis of factors influencing the severity of the personal injuries suffered by victims of motor accidents is an issue of major interest. Yet, most of the extant literature has tended to address this question by focusing on either the severity of temporary disability or the severity of permanent injury. In this paper, a bivariate copula-based regression model for temporary disability and permanent injury severities is introduced for the joint analysis of the relationship with the set of factors that might influence both categories of injury. Using a motor insurance database with 21,361 observations, the copula-based regression model is shown to give a better performance than that of a model based on the assumption of independence. The inclusion of the dependence structure in the analysis has a higher impact on the variance estimates of the injury severities than it does on the point estimates. By taking into account the dependence between temporary and permanent severities a more extensive factor analysis can be conducted. We illustrate that the conditional distribution functions of injury severities may be estimated, thus, providing decision makers with valuable information. Copyright © 2016 Elsevier Ltd. All rights reserved.
Yadav, Yad Ram; Parihar, Vijay; Agarwal, Moneet; Bhatele, Pushp Raj
2012-01-01
The management of intraoperative bleeding during removal of a large hyper vascular meningioma is crucial for safe and efficient surgery. Preoperative embolization of meningioma is the best way to reduce vascularity of meningiomas but this technique is not readily available, costly and has its own limitations. The study is aimed to evaluate the use of temporary clamping of external carotid artery to reduce blood loss and operating time during excision of large convexity, parasagittal or temporal base meningiomas. A prospective study of 115 consecutively operated meningiomas of size 5 cms or more were operated from January 2002 to December2010. Temporary clamping of external carotid artery was done in 61 while 51 cases were managed without clamping. There was significant reduction of blood loss, operative time and blood transfusion given in the temporary clipping group compared to non clipping group. There was stitch abscess in two patients each in clamping, and non clamping group. There was no scalp necrosis or mortality in any of the group. Temporary clamping of external carotid artery is a safe, simple and cost-effective alternative to embolization for the surgery of large meningiomas. This can be practiced at all the centers.
Influence of Screw Length and Bone Thickness on the Stability of Temporary Implants
Fernandes, Daniel Jogaib; Elias, Carlos Nelson; Ruellas, Antônio Carlos de Oliveira
2015-01-01
The purpose of this work was to study the influence of screw length and bone thickness on the stability of temporary implants. A total of 96 self-drilling temporary screws with two different lengths were inserted into polyurethane blocks (n = 66), bovine femurs (n = 18) and rabbit tibia (n = 12) with different cortical thicknesses (1 to 8 mm). Screws insertion in polyurethane blocks was assisted by a universal testing machine, torque peaks were collected by a digital torquemeter and bone thickness was monitored by micro-CT. The results showed that the insertion torque was significantly increased with the thickness of cortical bone from polyurethane (p < 0.0001), bovine (p = 0.0035) and rabbit (p < 0.05) sources. Cancellous bone improved significantly the mechanical implant stability. Insertion torque and insertion strength was successfully moduled by equations, based on the cortical/cancellous bone behavior. Based on the results, insertion torque and bone strength can be estimate in order to prevent failure of the cortical layer during temporary screw placement. The stability provided by a cortical thickness of 2 or 1 mm coupled to cancellous bone was deemed sufficient for temporary implants stability. PMID:28793582
Buffagni, Andrea; Tenchini, Roberta; Cazzola, Marcello; Erba, Stefania; Balestrini, Raffaella; Belfiore, Carlo; Pagnotta, Romano
2016-09-15
We hypothesized that reach-scale, bank and channel modification would impact benthic communities in temporary rivers of Sardinia, when pollution and water abstraction are not relevant. A range of variables were considered, which include both artificial structures/alterations and natural features observed in a stream reach. Multivariate regression trees (MRT) were used to assess the effects of the explanatory variables on invertebrate assemblages and five groups, characterized by different habitat modification and/or features, were recognized. Four node variables determined the splits in the MRT analysis: channel reinforcement, tree-related bank and channel habitats, channel modification and bank modification. Continuity of trees in the river corridor diverged among MRT groups and significant differences among groups include presence of alders, extent of channel shading and substrate diversity. Also, the percentage of in-stream organic substrates, in particular CPOM/Xylal, showed highly significant differences among groups. For practical applications, thresholds for the extent of channel reinforcement (40%) and modification (10%) and for bank alteration (≈30%) were provided, that can be used to guide the implementation of restoration measures. In moderately altered river reaches, a significant extent of tree-related habitats (≈5%) can noticeably mitigate the effects of morphological alteration on aquatic invertebrates. The outcomes highlight the importance of riparian zone management as an opportune, achievable prospect in the restoration of Mediterranean temporary streams. The impact of bank and channel modification on ecological status (sensu WFD) was investigated and the tested benthic metrics, especially those based on abundance data, showed legible differences among MRT groups. Finally, bank and channel modification appears to be a potential threat for the conservation of a few Sardo-Corsican endemic species. The introduction of management criteria that openly use information on endemic species seems crucial to reduce the risk of improving overall ecological status while depleting biodiversity. Copyright © 2016 Elsevier B.V. All rights reserved.
Wood, Jennifer D; Watson, Amy C; Fulambarker, Anjali J
2016-01-01
Although improving police responses to mental health crises has received significant policy attention, most encounters between police and persons with mental illnesses do not involve major crimes or violence, nor do they rise to the level of requiring emergency apprehension. Here, we report on field observations of police officers handling mental health-related encounters in Chicago. Findings confirm that these encounters often occur in the “gray zone”, where the problems at hand do not call for formal or legalistic interventions including arrest and emergency apprehension. In examining how police resolved such situations, we observed three core features of police work: (1) accepting temporary solutions to chronic vulnerability; (2) using local knowledge to guide decision-making; and (3) negotiating peace with complainants and call subjects. Study findings imply the need to advance field-based studies using systematic social observations of gray zone decision-making within and across distinct geographic and place-based contexts. Policy implications for supporting police interventions, including place-based enhancements of gray zone resources, are also discussed. PMID:28286406
Berg Jansson, Anna; Engström, Åsa
2017-08-01
The aim of this study is to describe critical care nurses (CCN's) experiences of working with or as temporary agency staff. This explorative qualitative study is based on interviews with five agency CCNs and five regular CCNs, a total of ten interviews, focusing on the interviewees' experiences of daily work and temporary agency staffing. The interviews were analysed manually and thematically following an inductive approach. Four themes that illustrate both similarities and differences between regular and temporary agency CCNs emerged: "working close to patients versus being responsible for everything", "teamwork versus independence", "both groups needed" and "opportunities and challenges". The study findings illustrate the complexity of the working situation for agency and regular staff in terms of the organisation and management of the temporary agency nurses and the opportunities and challenges faced by both groups. Copyright © 2016 Elsevier Ltd. All rights reserved.
THE COGNITIVE NEUROSCIENCE OF WORKING MEMORY
D’Esposito, Mark; Postle, Bradley R.
2015-01-01
For over 50 years, psychologists and neuroscientists have recognized the importance of a “working memory” to coordinate processing when multiple goals are active, and to guide behavior with information that is not present in the immediate environment. In recent years, psychological theory and cognitive neuroscience data have converged on the idea that information is encoded into working memory via the allocation of attention to internal representations – be they semantic long-term memory (e.g., letters, digits, words), sensory, or motoric. Thus, information-based multivariate analyses of human functional MRI data typically find evidence for the temporary representation of stimuli in regions that also process this information in nonworking-memory contexts. The prefrontal cortex, on the other hand, exerts control over behavior by biasing the salience of mnemonic representations, and adjudicating among competing, context-dependent rules. The “control of the controller” emerges from a complex interplay between PFC and striatal circuits, and ascending dopaminergic neuromodulatory signals. PMID:25251486
Return to Work After Temporary Disability Pension in Finland.
Laaksonen, Mikko; Gould, Raija
2015-09-01
When it is possible that the employee's work ability can be restored through treatment or rehabilitation, disability pension in Finland is granted for a fixed period. We examined which factors are associated with return to work (RTW) after such temporary disability pension. The study included all Finnish residents whose temporary disability pension from the earnings-related pension system started in 2008 (N = 10,269). Competing risks regression analysis was applied to examine register-based determinants for RTW after temporary disability pension due to mental disorders, musculoskeletal diseases, other diseases, and injury over a 4-year follow-up period. The overall cumulative incidence of RTW was 25%. RTW was more probable after temporary disability pension due to injury and musculoskeletal diseases and less probable after temporary disability pension due to mental disorders. Younger age and higher education increased RTW but differences between genders, private and public sector employees, and occupational classes were relatively small. The probability of RTW was higher among those who were employed before their temporary disability pension (subhazard ratio in multivariate analysis 2.41 (95% CI 2.13-2.72) and among the 9% who participated in vocational rehabilitation during their pension [SHR 2.10 (95% CI 1.90-2.31)]. With some exceptions, the results were fairly similar for all diagnostic causes of temporary disability pension. Return to work after temporary disability pension was relatively uncommon. Nevertheless, in all diagnostic groups RTW continued for the whole follow-up period. The low educated and those not employed before temporary disability pension need more support in their RTW. The strong association between vocational rehabilitation and RTW suggests that increasing rehabilitation among those with impaired work ability may promote RTW.
The effect of cockpit noise on the temporary threshold shift of Cessna 172SP flight instructors
NASA Astrophysics Data System (ADS)
Bellini, Andrew Robert
The purpose of this thesis was to study the temporary threshold shift of general aviation flight instructors resulting from their working environment. Exposure to noise before a temporary threshold shift completely recovers can cause a permanent threshold shift with no possibility of recovery, resulting in permanent hearing loss. A result showing minimal to no temporary threshold shift would indicate that hearing personal protective equipment is working properly. This study used sound-level measurements, and audiometric testing, together with survey data to determine whether or not flight instructors were at risk for potential hearing impairment due to temporary threshold shift. Independent t-tests and descriptive statistics were used in analyzing the data. It was determined that there was a difference in temporary threshold shift based on the number of hours a flight instructor flies in a Cessna 172SP for only one frequency - 2000Hz in the left ear. All other frequencies tested in both ears showed no difference. Because there was a very low mean temporary threshold shift at 2000Hz in the left ear and no differences shown for all other frequencies in both ears, it was concluded that there was no need to improve or require additional hearing personal protective equipment, or to require decreased exposure times to aircraft noise.
2007-07-01
clearance criteria is being prepared. Expected completion date: __ _ A temporary waiver for construction activity in the airfield vacinity was approved on...space clearance criteria is being prepared. Expected completion date: __ _ A temporary waiver for construction activity in the airfield vacinity was...construction activity in the airfield vacinity was approved on ____ (date). A permanent waiver of airfield/airspace clearance criteria was obtained on
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-12
...] Schedules of Controlled Substances: Temporary Placement of Three Synthetic Cannabinoids Into Schedule I... temporarily schedule three synthetic cannabinoids into the Controlled Substances Act (CSA) pursuant to the...). This action is based on a finding by the Deputy Administrator that the placement of these synthetic...
20 CFR 655.166 - Requests for determinations based on nonavailability of U.S. workers.
Code of Federal Regulations, 2011 CFR
2011-04-01
... nonavailability of U.S. workers. 655.166 Section 655.166 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR TEMPORARY EMPLOYMENT OF FOREIGN WORKERS IN THE UNITED STATES Labor Certification Process for Temporary Agricultural Employment in the United States (H-2A Workers) Labor...
20 CFR 655.166 - Requests for determinations based on nonavailability of U.S. workers.
Code of Federal Regulations, 2010 CFR
2010-04-01
... nonavailability of U.S. workers. 655.166 Section 655.166 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR TEMPORARY EMPLOYMENT OF FOREIGN WORKERS IN THE UNITED STATES Labor Certification Process for Temporary Agricultural Employment in the United States (H-2A Workers) Labor...
38 CFR 36.4318 - Servicer tier ranking-temporary procedures.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 38 Pensions, Bonuses, and Veterans' Relief 2 2010-07-01 2010-07-01 false Servicer tier ranking... § 36.4318 Servicer tier ranking—temporary procedures. (a) The Secretary shall assign to each servicer a “Tier Ranking” based upon the servicer's performance in servicing guaranteed loans. There shall be four...
Investigational procedures in benign prostatic hypertrophy.
Acquaye, Joseph; Borofsky, Michael S
2018-05-01
As benign prostatic hypertrophy (BPH) becomes a more common disease, there has been a dramatic rise in the number of investigational procedures being developed to manage it. We seek to present an overview of the most recently developed treatments and present clinical data related to application wherever available. As a greater number of treatments become available for BPH, improved diagnostic testing could prove beneficial in helping guide patient selection. Efforts are underway to identify serum biomarkers associated with BPH as well as new classifications strategies, specifically with MRI, to determine both the anatomy of BPH as well as its histologic distribution. Outpatient-based procedures for BPH currently being developed include the temporary implantable nitinol device as well as intraprostatic injections such as Botox and PRX302. Aquablation is a novel technique that uses robotically guided high-pressured saline to ablate prostate tissue. Early data suggests noninferiority compared with TURP. Finally, efforts are underway to apply robotics to BPH with the advent of a robotic transurethral platform being designed for prostate enucleation. Many new techniques are poised to be introduced to the BPH market over the coming years. The unique risk/benefit profiles as well as associated clinical outcomes of each will need to be studied in detail in order to help identify proper roles in the management of patients with symptomatic disease.
Alternative therapies in management of leiomyomas.
Patel, Amrita; Malik, Minnie; Britten, Joy; Cox, Jeris; Catherino, William H
2014-09-01
Leiomyomas are benign soft-tissue neoplasms that arise from smooth muscle. Relief of symptoms (abnormal uterine bleeding, pain, pressure) is the major goal in management of women with significant symptoms. For symptomatic myomas, hysterectomy is a definitive solution; however, there are emerging less-invasive options. Magnetic resonance imaging-guided focused ultrasound surgery, cryomyolysis, and temporary occlusion of the uterine arteries are treatment options that are minimally invasive interventions with the benefit of preserving the uterus. This review summarizes procedure techniques, eligibility, complications, and outcomes of these alternate therapies. Published by Elsevier Inc.
Tools for Understanding Space Weather Impacts to Satellites
NASA Astrophysics Data System (ADS)
Green, J. C.; Shprits, Y.; Likar, J. J.; Kellerman, A. C.; Quinn, R. A.; Whelan, P.; Reker, N.; Huston, S. L.
2017-12-01
Space weather causes dramatic changes in the near-Earth radiation environment. Intense particle fluxes can damage electronic components on satellites, causing temporary malfunctions, degraded performance, or a complete system/mission loss. Understanding whether space weather is the cause of such problems expedites investigations and guides successful design improvements resulting in a more robust satellite architecture. Here we discuss our progress in developing tools for satellite designers, manufacturers, and decision makers - tools that summarize space weather impacts to specific satellite assets and enable confident identification of the cause and right solution.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-13
... SECURITIES AND EXCHANGE COMMISSION [Release No. 34-68864; File No. S7-27-11] Order Extending.... Introduction On July 1, 2011, the Securities and Exchange Commission (``Commission'') issued an order granting... security-based swaps (``Exchange Act Exemptive Order'').\\1\\ Certain temporary exemptions contained in the...
ERIC Educational Resources Information Center
Montoya, Isaac D.
2008-01-01
Three classification techniques (Chi-square Automatic Interaction Detection [CHAID], Classification and Regression Tree [CART], and discriminant analysis) were tested to determine their accuracy in predicting Temporary Assistance for Needy Families program recipients' future employment. Technique evaluation was based on proportion of correctly…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-03
... things, that transactions in security-based swaps be cleared through a clearing agency that is registered... SECURITIES AND EXCHANGE COMMISSION [Release No. 34-63390; File No. S7-17-09] Order Extending Temporary Conditional Exemptions Under the Securities Exchange Act of 1934 in Connection With Request on...
Mapping the temporary and perennial character of whole river networks
NASA Astrophysics Data System (ADS)
González-Ferreras, A. M.; Barquín, J.
2017-08-01
Knowledge of the spatial distribution of temporary and perennial river channels in a whole catchment is important for effective integrated basin management and river biodiversity conservation. However, this information is usually not available or is incomplete. In this study, we present a statistically based methodology to classify river segments from a whole river network (Deva-Cares catchment, Northern Spain) as temporary or perennial. This method is based on an a priori classification of a subset of river segments as temporary or perennial, using field surveys and aerial images, and then running Random Forest models to predict classification membership for the rest of the river network. The independent variables and the river network were derived following a computer-based geospatial simulation of riverine landscapes. The model results show high values of overall accuracy, sensitivity, and specificity for the evaluation of the fitted model to the training and testing data set (≥0.9). The most important independent variables were catchment area, area occupied by broadleaf forest, minimum monthly precipitation in August, and average catchment elevation. The final map shows 7525 temporary river segments (1012.5 km) and 3731 perennial river segments (662.5 km). A subsequent validation of the mapping results using River Habitat Survey data and expert knowledge supported the validity of the proposed maps. We conclude that the proposed methodology is a valid method for mapping the limits of flow permanence that could substantially increase our understanding of the spatial links between terrestrial and aquatic interfaces, improving the research, management, and conservation of river biodiversity and functioning.
NASA Astrophysics Data System (ADS)
Rau, Thomas S.; Lexow, G. Jakob; Blume, Denise; Kluge, Marcel; Lenarz, Thomas; Majdani, Omid
2017-03-01
A new method for template-guided cochlear implantation surgery is proposed which has been developed to create a minimally invasive access to the inner ear. A first design of the surgical template was drafted, built, and finally tested regarding its accuracy. For individual finalization of the micro-stereotactic frame bone cement is utilized as this well-known and well-established material suggests ease of use as well as high clinical acceptance and enables both sterile and rapid handling. The new concept includes an alignment device, based on a passive hexapod with manually adjustable legs for temporary fixation of the separate parts in the patient-specific pose until the bone cement is spread and finally cured. Additionally, a corresponding evaluation method was developed to determine the accuracy of the microstereotactic frame in some initial experiments. In total 18 samples of the surgical template were fabricated based on previously planned trajectories. The mean positioning error at the target point was 0.30 mm with a standard deviation of 0.25 mm.
Engel, Andrew; Rappard, George; King, Wade; Kennedy, David J
2016-04-01
To determine the effectiveness and risks of fluoroscopically-guided cervical medial branch thermal radiofrequency neurotomy (CMBTRFN) for treating chronic neck pain of zygapophysial joint origin. Systematic review of the literature with comprehensive analysis of the published data. Four reviewers formally trained in evidence-based medicine searched the literature on CMBTRFN. Each assessed the methodologies of studies found and appraised the quality of evidence presented. The primary outcomes assessed were 100% relief of pain 6 and 12 months after treatment. Other outcomes were noted if reported. The evidence was evaluated in accordance with the Grades of Recommendation, Assessment, Development, and Evaluation (GRADE) system. The searches yielded eight primary publications on the effectiveness of the procedure. The evidence shows a majority of patients were pain free at 6 months and over a third were pain free at 1 year. The number needed to treat for complete pain relief at 6 months is 2. The evidence of effectiveness is of high quality according to the GRADE system. Twelve papers were found reporting unwanted effects, most of which are minor and temporary. No serious complications have ever been reported from procedures performed according to the published guidelines. The evidence of risks is of low quality according to the GRADE system. If performed as described in the International Spine Intervention Society Guidelines, fluoroscopically-guided CMBTRFN is effective for abolishing zygapophysial joint pain and carries only minor risks. © 2015 American Academy of Pain Medicine. All rights reserved. For permissions, please e-mail: journals.permissions@oup.com.
Real-time self-calibration of a tracked augmented reality display
NASA Astrophysics Data System (ADS)
Baum, Zachary; Lasso, Andras; Ungi, Tamas; Fichtinger, Gabor
2016-03-01
PURPOSE: Augmented reality systems have been proposed for image-guided needle interventions but they have not become widely used in clinical practice due to restrictions such as limited portability, low display refresh rates, and tedious calibration procedures. We propose a handheld tablet-based self-calibrating image overlay system. METHODS: A modular handheld augmented reality viewbox was constructed from a tablet computer and a semi-transparent mirror. A consistent and precise self-calibration method, without the use of any temporary markers, was designed to achieve an accurate calibration of the system. Markers attached to the viewbox and patient are simultaneously tracked using an optical pose tracker to report the position of the patient with respect to a displayed image plane that is visualized in real-time. The software was built using the open-source 3D Slicer application platform's SlicerIGT extension and the PLUS toolkit. RESULTS: The accuracy of the image overlay with image-guided needle interventions yielded a mean absolute position error of 0.99 mm (95th percentile 1.93 mm) in-plane of the overlay and a mean absolute position error of 0.61 mm (95th percentile 1.19 mm) out-of-plane. This accuracy is clinically acceptable for tool guidance during various procedures, such as musculoskeletal injections. CONCLUSION: A self-calibration method was developed and evaluated for a tracked augmented reality display. The results show potential for the use of handheld image overlays in clinical studies with image-guided needle interventions.
Drug Abuse Prevention: Report of the Temporary State Commission to Evaluate the Drug Laws.
ERIC Educational Resources Information Center
Betros, Emeel S.; And Others
The findings and recommendations of the Temporary State Commission to Evaluate the Drug Laws, set forth in the introduction to this report, are based on questionnaires to prevention experts and professionals responsible for child and adolescent care, on communications with community agencies, and on statewide public hearings. The committee found…
ERIC Educational Resources Information Center
Tak, Jinkook; Lim, Beomsik
2008-01-01
The purpose of this study was to examine differences in career-related variables, such as career commitment and career satisfaction, based on employment status (temporary vs. permanent employees) and job type (professional vs. nonprofessional employees). With a sample of 302 employees working in information technology companies in Korea, it was…
2012-03-01
amplitude), frequency (pitch), and duration. Each of these characteristics plays a role in determining a noise’s intrusiveness and level of impact on a...1 for the Construction of a Temporary Lodging Facility Eglin Air Force Base, FL 6. LIST OF PREPARERS AND CONTRIBUTORS Name/Title Project Role ...categorized as one of the following: _ Federal As.sistAnce to Sts.te o r Local Gonrnment (IS CFR 930, Subpart F). Agtncies stre required to evaluate
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-27
...This temporary rule amends the regulations of the Alcohol and Tobacco Tax and Trade Bureau (TTB) pertaining to permits for importers of tobacco products and processed tobacco by extending the duration of new permits from three years to five years. Based on its experience in the administration and enforcement of importer permits over the past decade, TTB believes that it can gain administrative efficiencies and reduce the burden on industry members, while still meeting the purposes of the limited-duration permit, by extending the permit duration to five years. This temporary rule also makes several technical corrections by amending the definition of ``Manufacturer of tobacco products'' to reflect a recent statutory change, and by amending a reference to the sale price of large cigars to incorporate a clarification published in a prior TTB temporary rule. Finally, this temporary rule incorporates and reissues TTB regulations pertaining to importer permit requirements for tobacco products, and minimum manufacturing and marking requirements for tobacco products and cigarette papers and tubes, and, as a result, these temporary regulations replace temporary regulations originally published in 1999. TTB is soliciting comments from all interested parties on these regulatory provisions through a notice of proposed rulemaking published elsewhere in this issue of the Federal Register.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-07
... SECURITIES AND EXCHANGE COMMISSION [Release No. 34-64796; File No. S7-28-11] Order Pursuant to Section 36 of the Securities Exchange Act of 1934 Granting Temporary Exemptions From Clearing Agency... Services for Security-Based Swaps July 1, 2011. I. Introduction Title VII of the Dodd-Frank Wall Street...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-30
... commercial annual catch limit (ACL) for yellowtail snapper implemented by a temporary rule published by NMFS on November 7, 2012. The commercial ACL for yellowtail snapper of 1,596,510 lb (724,165 kg), round... to ensure the commercial ACL for yellowtail snapper is based on the best scientific information...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-03
..., high interest vessels (HIVs), or tankers, as defined under 33 CFR 165.1183. Persons and vessels are... this temporary rule as necessary because it allows the Coast Guard to better protect HIVs. As noted in... Coast Guard in better position to afford protection to HIVs. Basis and Purpose Based on experience with...
Waddell, T Franklin
2016-07-01
Temporary messaging programs continue to rise in popularity, due in large part to the perceived privacy that they afford. However, recent controversies have revealed that messages shared on ephemeral messaging services are persistent and potentially retrieval, thus undermining the privacy they are assumed to provide. Given this paradox, why are temporary messaging services so popular? Does the allure of privacy still motivate the use of temporary messaging programs? Or, if privacy is no longer afforded by ephemeral messaging, what other psychological gratifications do these applications fulfill that might account for their continued use? Informed by the Modality-Agency-Interactivity-Navigability (MAIN) model and the uses and gratifications tradition, the current study conducted qualitative interviews to identify the gratifications that individuals derive from the popular ephemeral messaging application, Snapchat. Study results show that the visual affordances of ephemeral messaging have legitimized photographic communication, providing self-expression and relational gratifications that are unfulfilled by text-based applications. By comparison, users report low levels of trust in the privacy affordances of ephemeral messaging, and instead projecting negative effects of temporary messaging on other users rather than self. Theoretical and practical implications of these results are discussed.
A Conservative Method of Retaining an Interim Obturator for a Total Maxillectomy Patient
Bettie, Nirmal Famila
2017-01-01
Interim obturators are indicated during the postsurgical phases. It promotes surgical healing and serves as a temporary prosthesis to rehabilitate a patient with intra-oral surgical defect. Retention is gained by wiring, surgical suturing, and other noninvasive methods to enable functional rehabilitation and easy replacement with a permanent obturator. Interim obturators serve as an easy guide for replacing with definitive obturators by indicating prosthesis extensions and the required method of retention. A more conservative and noninvasive method of retaining an interim obturator for a maxillectomy patient is described in this case report. PMID:29284985
A Conservative Method of Retaining an Interim Obturator for a Total Maxillectomy Patient.
Bettie, Nirmal Famila
2017-11-01
Interim obturators are indicated during the postsurgical phases. It promotes surgical healing and serves as a temporary prosthesis to rehabilitate a patient with intra-oral surgical defect. Retention is gained by wiring, surgical suturing, and other noninvasive methods to enable functional rehabilitation and easy replacement with a permanent obturator. Interim obturators serve as an easy guide for replacing with definitive obturators by indicating prosthesis extensions and the required method of retention. A more conservative and noninvasive method of retaining an interim obturator for a maxillectomy patient is described in this case report.
Murai, Hideko; Nakayama, Takeo
2008-01-01
Background In Japan, the temporary leave and drop-out rate of university or junior college students has been increasing in recent years, and many cases have been attributed to psychological problems. To establish a mental health support system for entering students, we conducted a questionnaire and follow-up survey, and explored predictors of temporary leaves and drop-outs among junior college women. Methods Our sample consisted of 485 first-year female students attending a junior college in Osaka, Japan. Between 1998 and 2002, the following factors were assessed: lifestyle, college life, subjective well-being measured by the General Well-Being Schedule (GWBS), self-esteem, and emotional support network. A follow-up survey was conducted during 1 year. Results Thirty-seven women, who had taken temporary leaves or had dropped out during the first year, showed unfavorable responses to lifestyle, college life and/or subjective well-being compared with other students. No differences in self-esteem and emotional support network were found between the two groups. A multiple regression analysis showed that non-existence of interesting club activity, smoking, and low level of life satisfaction and emotional stability measured by the GWBS were predictors of temporary leaves and drop-outs. Conclusion It may be possible to determine which students are at risk for taking temporary leaves or dropping out based on their psychological state and lifestyle at the time of enrollment in college. More support is needed to continue the students at school who are at high risk for taking temporary leaves or dropping out. PMID:18305364
Murai, Hideko; Nakayama, Takeo
2008-01-01
In Japan, the temporary leave and drop-out rate of university or junior college students has been increasing in recent years, and many cases have been attributed to psychological problems. To establish a mental health support system for entering students, we conducted a questionnaire and follow-up survey, and explored predictors of temporary leaves and drop-outs among junior college women. Our sample consisted of 485 first-year female students attending a junior college in Osaka, Japan. Between 1998 and 2002, the following factors were assessed: lifestyle, college life, subjective well-being measured by the General Well-Being Schedule (GWBS), self-esteem, and emotional support network. A follow-up survey was conducted during 1 year. Thirty-seven women, who had taken temporary leaves or had dropped out during the first year, showed unfavorable responses to lifestyle, college life and/or subjective well-being compared with other students. No differences in self-esteem and emotional support network were found between the two groups. A multiple regression analysis showed that non-existence of interesting club activity, smoking, and low level of life satisfaction and emotional stability measured by the GWBS were predictors of temporary leaves and drop-outs. It may be possible to determine which students are at risk for taking temporary leaves or dropping out based on their psychological state and lifestyle at the time of enrollment in college. More support is needed to continue the students at school who are at high risk for taking temporary leaves or dropping out.
Temporary sharing prompts unrestrained disclosures that leave lasting negative impressions.
Hofstetter, Reto; Rüppell, Roland; John, Leslie K
2017-11-07
With the advent of social media, the impressions people make on others are based increasingly on their digital disclosures. However, digital disclosures can come back to haunt, making it challenging for people to manage the impressions they make. In field and online experiments in which participants take, share, and evaluate self-photographs ("selfies"), we show that, paradoxically, these challenges can be exacerbated by temporary-sharing media-technologies that prevent content from being stored permanently. Relative to permanent sharing, temporary sharing affects both whether and what people reveal. Specifically, temporary sharing increases compliance with the request to take a selfie (study 1) and induces greater disclosure risks (i.e., people exhibit greater disinhibition in their selfies, studies 1 and 2). This increased disclosure is driven by reduced privacy concerns (study 2). However, observers' impressions of sharers are insensitive to permanence (i.e., whether the selfie was shared temporarily versus permanently) and are instead driven by the disinhibition exhibited in the selfie (studies 4-7). As a result, induced by the promise of temporary sharing, sharers of uninhibited selfies come across as having worse judgment than those who share relatively discreet selfies (studies 1, 2, and 4-7)-an attributional pattern that is unanticipated by sharers (study 3), that persists days after the selfie has disappeared (study 5), is robust to personal experience with temporary sharing (studies 6A and 6B), and holds even among friends (studies 7A and 7B). Temporary sharing may bring back forgetting, but not without introducing new (self-presentational) challenges. Copyright © 2017 the Author(s). Published by PNAS.
Temporary sharing prompts unrestrained disclosures that leave lasting negative impressions
Rüppell, Roland; John, Leslie K.
2017-01-01
With the advent of social media, the impressions people make on others are based increasingly on their digital disclosures. However, digital disclosures can come back to haunt, making it challenging for people to manage the impressions they make. In field and online experiments in which participants take, share, and evaluate self-photographs (“selfies”), we show that, paradoxically, these challenges can be exacerbated by temporary-sharing media—technologies that prevent content from being stored permanently. Relative to permanent sharing, temporary sharing affects both whether and what people reveal. Specifically, temporary sharing increases compliance with the request to take a selfie (study 1) and induces greater disclosure risks (i.e., people exhibit greater disinhibition in their selfies, studies 1 and 2). This increased disclosure is driven by reduced privacy concerns (study 2). However, observers’ impressions of sharers are insensitive to permanence (i.e., whether the selfie was shared temporarily versus permanently) and are instead driven by the disinhibition exhibited in the selfie (studies 4–7). As a result, induced by the promise of temporary sharing, sharers of uninhibited selfies come across as having worse judgment than those who share relatively discreet selfies (studies 1, 2, and 4–7)—an attributional pattern that is unanticipated by sharers (study 3), that persists days after the selfie has disappeared (study 5), is robust to personal experience with temporary sharing (studies 6A and 6B), and holds even among friends (studies 7A and 7B). Temporary sharing may bring back forgetting, but not without introducing new (self-presentational) challenges. PMID:29078302
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-30
... wage determinations based on the new prevailing wage methodology set forth in the Wage Rule, as to the... comment, we published a Final Rule on August 1, 2011, which set the new effective date for the Wage Rule... date of the Wage Methodology for the Temporary Non- agricultural Employment H-2B Program Final Rule...
Appelqvist-Schmidlechner, Kaija; Henriksson, Markus; Parkkola, Kai; Stengård, Eija
2013-05-01
Military or alternative civilian service is obligatory for all Finnish male citizens. About 70% of each annual age cohort carry out this service. The rest are given either a permanent or temporary exemption from military or civil service. The aim of this study was to investigate predictors associated with completing military service after having once been given a temporary exemption from service. The study sample consisted of 245 men who were exempted temporarily from service. The data were collected through questionnaires and register data. During the 5-year follow-up, only 21 men had completed the service following a previous temporary exemption. Completing military service was associated with an exemption based on a somatic diagnosis, having no suicidal ideation in the past, no history of parental divorce, and having physical exercise at least once a week. The results of this study support the idea of preferring to give a permanent exemption instead of a temporary exemption. However, this trend runs the risk of discharging men who could be capable of later completing the service successfully. Reprint & Copyright © 2013 Association of Military Surgeons of the U.S.
Matano, Fumihiro; Mizunari, Takayuki; Kominami, Shushi; Suzuki, Masanori; Fujiki, Yu; Kubota, Asami; Kobayashi, Shiro; Murai, Yasuo; Morita, Akio
2017-04-01
It is difficult to treat large internal carotid aneurysms with simple surgical clipping. Here, we present a retrograde suction decompression (RSD) procedure for large internal carotid aneurysms using a balloon guide catheter combined with a blood-returning circuit and a superficial temporal artery to middle cerebral artery (STA-MCA) bypass.All patients underwent an STA-MCA bypass before the temporary occlusion of the internal carotid artery (ICA). A 6-French sheath was inserted into the common carotid artery (CCA), and a 6-French Patrive balloon catheter was placed into the ICA 5 cm past the bifurcation. Aneurysm exposure was obtained; temporary clips were placed on the proximal M1, A1, and posterior communicating (Pcom) segments; and an extension tube was then connected to the balloon catheter. A three-way stopcock was placed, and aspiration was performed through the device to collapse the aneurysm. The aspirated blood was returned to a venous line with an added heparin to prevent anemia after aspiration. During the decompression, the blood flow to the cortical area was supplied through the STA-MCA bypass. After the aneurysm collapse, the surgeon carefully dissected the perforating artery from the aneurysm dome or neck, and permanent clips were then placed on the aneurysm neck. Our procedure has several advantages, such as STA-MCA bypass without external carotid artery occlusion for preventing ischemic complications of the cortical area, anemia may be avoided because of the return of the aspirated blood, and a hybrid operation room is not required to perform this method.
Smart Garbage Based on Internet of Things (IoT)
NASA Astrophysics Data System (ADS)
Joni, K.; Haryanto; Rohim, D. F.
2018-01-01
Trash is one of serious problems in Indonesia. It leads to another problems which deal with social, culture and economic, most of cities inindonesia have some problems in managing the trush. It is because the government doesn’t have the standard of trash management. The schedule to take the trash usually discover a problems with a lateness. The lack of trashmanagement and people’s habbit who don’t care about the trash impact effect to more serious problems that dealwith the trash. Such as, enviromental problems. Based on the problems the researcher makes a system called “Smart Garbage Based On Internet of things”. The system applies the technology of temporary garbage used internal system. This system creates in order to fix the problem of punctuality. Which makes the trash management more effective and afficient. The process of uploading the information in the internal awerness of based on the “real time” ativity this system can increase the peurity and health. Because the trash is controlled and not aculamulated arround people. The ultrasonic sensor and nodeMCU are used as a module of IoT to discover the temporary garbage. Grapical user Interface dekstop and android are also used in order to observe the level of trash in temporary garbage. The notification system can be access in mobile and dekstop interface. Furthermore the temporary garbage location can find by using google map the result of research shows that the system is running well. The system can onilne 12 hours/day along 2 weeks in exsperiment. The data sent by online based on “real time” activity and the result of mapping and tracking on android show the location of garbage.
NASA Astrophysics Data System (ADS)
Gallart, F.; Prat, N.; García-Roger, E. M.; Latron, J.; Rieradevall, M.; Llorens, P.; Barberá, G. G.; Brito, D.; De Girolamo, A. M.; Lo Porto, A.; Buffagni, A.; Erba, S.; Neves, R.; Nikolaidis, N. P.; Perrin, J. L.; Querner, E. P.; Quiñonero, J. M.; Tournoud, M. G.; Tzoraki, O.; Skoulikidis, N.; Gómez, R.; Sánchez-Montoya, M. M.; Froebrich, J.
2012-09-01
Temporary streams are those water courses that undergo the recurrent cessation of flow or the complete drying of their channel. The structure and composition of biological communities in temporary stream reaches are strongly dependent on the temporal changes of the aquatic habitats determined by the hydrological conditions. Therefore, the structural and functional characteristics of aquatic fauna to assess the ecological quality of a temporary stream reach cannot be used without taking into account the controls imposed by the hydrological regime. This paper develops methods for analysing temporary streams' aquatic regimes, based on the definition of six aquatic states that summarize the transient sets of mesohabitats occurring on a given reach at a particular moment, depending on the hydrological conditions: Hyperrheic, Eurheic, Oligorheic, Arheic, Hyporheic and Edaphic. When the hydrological conditions lead to a change in the aquatic state, the structure and composition of the aquatic community changes according to the new set of available habitats. We used the water discharge records from gauging stations or simulations with rainfall-runoff models to infer the temporal patterns of occurrence of these states in the Aquatic States Frequency Graph we developed. The visual analysis of this graph is complemented by the development of two metrics which describe the permanence of flow and the seasonal predictability of zero flow periods. Finally, a classification of temporary streams in four aquatic regimes in terms of their influence over the development of aquatic life is updated from the existing classifications, with stream aquatic regimes defined as Permanent, Temporary-pools, Temporary-dry and Episodic. While aquatic regimes describe the long-term overall variability of the hydrological conditions of the river section and have been used for many years by hydrologists and ecologists, aquatic states describe the availability of mesohabitats in given periods that determine the presence of different biotic assemblages. This novel concept links hydrological and ecological conditions in a unique way. All these methods were implemented with data from eight temporary streams around the Mediterranean within the MIRAGE project. Their application was a precondition to assessing the ecological quality of these streams.
Temporary site selection and decision-making methods: a case study of Tehran, Iran.
Omidvar, Babak; Baradaran-Shoraka, Mohammad; Nojavan, Mehdi
2013-07-01
Decisions on selecting an appropriate site for temporary shelter used to be taken in a limited amount of time after a disaster. The need for a systematic method in this area inspired the MADM (multi-attribute decision making) for complex disaster management decisions. This research proposes a model for appropriate and systematic site selection for temporary shelters, before an earthquake, using a geographical information system and MADM based on an earthquake damage assessment. After the effective criteria for site selection of temporary shelters are determined, the geographical layers of these criteria are prepared for Municipal District No.1 of Greater Tehran, the capital of Iran. Given these attributes and the required shelter area (415-610 hectares), 14 zones are proposed initially. Various MADM methods are used for the final selection. The mean of the aggregated ranking results are determined, and 10 of the 14 initial zones are ranked. © 2013 The Author(s). Journal compilation © Overseas Development Institute, 2013.
Abbas, R A; Hammam, R A M; El-Gohary, S S; Sabik, L M E; Hunter, M S
2013-01-01
Informal employment is common in developing countries, including Egypt. This type of employment may have significant consequences on mental health. To determine the prevalence and risk factors of common mental disorders and substance abuse among temporary hired hospital cleaners. A cross-sectional study was conducted on 242 adult temporary cleaners and 209 permanent cleaners working in 4 governmental hospitals in Zagazig City, Sharqia Governorate, Egypt. All participants were invited to complete a structured questionnaire through a semi-structured interview which included the self-reporting questionnaire 20 items (SRQ-20) and the work stress scale. Assessment of drug use included urine-based screening tests for common substances abused. The prevalence of job stress, common mental disorders and substance abuse, particularly tramadol and cannabis (Bango), was significantly higher in the studied temporary cleaners compared to permanent cleaners. Risk factors associated with increased susceptibility of the temporary cleaners to common mental disorders were family history of substance abuse, high crowding index, history of physical illness, low educational level, and smoking; while being unmarried, male sex, family history of mental disorder, age ≥40 years, smoking, and length of service ≥8 years, were associated with substance abuse among the same group. Temporary hired hospital cleaners suffered from impaired mental health more than permanent cleaners. Therefore, expanding the coverage of current laws and occupational safety and health standards to cover workers in the informal sector especially in developing countries is recommended.
1998-11-06
Still suspended by a crane and cables in the Space Station Processing Facility, yet hidden by the top of the Z1 integrated truss structure, the Passive Common Berthing Mechanism (PCBM) is lowered onto the truss for attachment. Workers at the top of a workstand guide it into place. A component of the International Space Station (ISS), the Z1 truss will be used for the temporary installation of the P6 truss segment to the Unity connecting module. The P6 truss segment contains the solar arrays and batteries which will provide early station power. The truss is scheduled to be launched aboard STS-92 in late 1999
Booth, M J; van der Lugt, J J; van Heerden, A; Picard, J A
2001-06-01
Disseminated mycosis caused by Paecilomyces varioti in a female German shepherd dog presented with chronic forelimb lameness is described. Radiographs of the swollen carpal joint revealed geographic lysis of the radial epiphysis. Diagnosis was based on cytological demonstration of fungal hyphae and chlamydiospores, as well as fungal culture of fluid obtained by arthrocentesis. Temporary remission was characterised by markedly improved clinical signs and laboratory parameters, following treatment with ketoconazole. The dog was euthanased 9 months after the initial diagnosis, following the diagnosis of multifocal discospondylitis. This appears to be the longest described period of temporary remission obtained with treatment in dogs with paecilomycosis. Clinical, clinicopathological and necropsy findings of this disease in another German shepherd dog are briefly described.
"Self-Peel-Off" Transfer Produces Ultrathin Polyvinylidene-Fluoride-Based Flexible Nanodevices.
Tai, Yanlong; Lubineau, Gilles
2017-04-01
Here, a new strategy, self-peel-off transfer, for the preparation of ultrathin flexible nanodevices made from polyvinylidene-fluoride (PVDF) is reported. In this process, a functional pattern of nanoparticles is transferred via peeling from a temporary substrate to the final PVDF film. This peeling process takes advantage of the differences in the work of adhesion between the various layers (the PVDF layer, the nanoparticle-pattern layer and the substrate layer) and of the high stresses generated by the differential thermal expansion of the layers. The work of adhesion is mainly guided by the basic physical/chemical properties of these layers and is highly sensitive to variations in temperature and moisture in the environment. The peeling technique is tested on a variety of PVDF-based functional films using gold/palladium nanoparticles, carbon nanotubes, graphene oxide, and lithium iron phosphate. Several PVDF-based flexible nanodevices are prepared, including a single-sided wireless flexible humidity sensor in which PVDF is used as the substrate and a double-sided flexible capacitor in which PVDF is used as the ferroelectric layer and the carrier layer. Results show that the nanodevices perform with high repeatability and stability. Self-peel-off transfer is a viable preparation strategy for the design and fabrication of flexible, ultrathin, and light-weight nanodevices.
Microcomputer-based classification of environmental data in municipal areas
NASA Astrophysics Data System (ADS)
Thiergärtner, H.
1995-10-01
Multivariate data-processing methods used in mineral resource identification can be used to classify urban regions. Using elements of expert systems, geographical information systems, as well as known classification and prognosis systems, it is possible to outline a single model that consists of resistant and of temporary parts of a knowledge base including graphical input and output treatment and of resistant and temporary elements of a bank of methods and algorithms. Whereas decision rules created by experts will be stored in expert systems directly, powerful classification rules in form of resistant but latent (implicit) decision algorithms may be implemented in the suggested model. The latent functions will be transformed into temporary explicit decision rules by learning processes depending on the actual task(s), parameter set(s), pixels selection(s), and expert control(s). This takes place both at supervised and nonsupervised classification of multivariately described pixel sets representing municipal subareas. The model is outlined briefly and illustrated by results obtained in a target area covering a part of the city of Berlin (Germany).
Rural–urban migration and mental and sexual health: a case study in Southwestern China
Yang, Xiushi
2014-01-01
Massive rural–urban temporary migration has taken place amid China's rapid economic growth and development. Much has been written about the economic causes and consequences of this massive migration; less studied are the potential health and behavioral impacts of migration on migrants. Using data from a population-based sample survey conducted in southwestern China, this paper examines the potential impact of rural–urban migration and post-migration urban living on migrants' mental health and sexual risk behavior. The results suggest that regardless of places of origin and destination temporary migrants had on average poorer mental health and riskier sexual behavior than non-migrants. Compared to living in rural areas, living in urban areas does not make statistical difference in residents' mental health; it is only marginally associated with riskier sexual behavior. Rural–urban temporary migrants' mental health and health risk sexual behavior deserve more immediate research attention. Both selectivity of temporary migrants and migration-induced psycho-socio-behavioral changes may have contributed to migrants' poorer mental health and riskier sexual behavior. However, more theory-driven research with longitudinal design is needed before firm conclusions can be drawn about the underlying mechanisms that mediate or moderate the impact of temporary migration on migrants' mental health and sexual risk behavior. PMID:25932350
Code of Federal Regulations, 2013 CFR
2013-07-01
... 32 National Defense 1 2013-07-01 2013-07-01 false Temporary eligibility for access at the confidential and secret levels and temporary eligibility for âLâ access authorization. 147.30 Section 147.30... Temporary Access § 147.30 Temporary eligibility for access at the confidential and secret levels and...
Code of Federal Regulations, 2012 CFR
2012-07-01
... 32 National Defense 1 2012-07-01 2012-07-01 false Temporary eligibility for access at the confidential and secret levels and temporary eligibility for âLâ access authorization. 147.30 Section 147.30... Temporary Access § 147.30 Temporary eligibility for access at the confidential and secret levels and...
Code of Federal Regulations, 2010 CFR
2010-07-01
... 32 National Defense 1 2010-07-01 2010-07-01 false Temporary eligibility for access at the confidential and secret levels and temporary eligibility for âLâ access authorization. 147.30 Section 147.30... Temporary Access § 147.30 Temporary eligibility for access at the confidential and secret levels and...
Code of Federal Regulations, 2011 CFR
2011-07-01
... 32 National Defense 1 2011-07-01 2011-07-01 false Temporary eligibility for access at the confidential and secret levels and temporary eligibility for âLâ access authorization. 147.30 Section 147.30... Temporary Access § 147.30 Temporary eligibility for access at the confidential and secret levels and...
Code of Federal Regulations, 2014 CFR
2014-07-01
... 32 National Defense 1 2014-07-01 2014-07-01 false Temporary eligibility for access at the confidential and secret levels and temporary eligibility for âLâ access authorization. 147.30 Section 147.30... Temporary Access § 147.30 Temporary eligibility for access at the confidential and secret levels and...
Siebert, Uwe; Wurm, Johannes; Gothe, Raffaella Matteucci; Arvandi, Marjan; Vavricka, Stephan R; von Känel, Roland; Begré, Stefan; Sulz, Michael C; Meyenberger, Christa; Sagmeister, Markus
2013-01-01
Inflammatory bowel disease can decrease the quality of life and induce work disability. We sought to (1) identify and quantify the predictors of disease-specific work disability in patients with inflammatory bowel disease and (2) assess the suitability of using cross-sectional data to predict future outcomes, using the Swiss Inflammatory Bowel Disease Cohort Study data. A total of 1187 patients were enrolled and followed up for an average of 13 months. Predictors included patient and disease characteristics and drug utilization. Potential predictors were identified through an expert panel and published literature. We estimated adjusted effect estimates with 95% confidence intervals using logistic and zero-inflated Poisson regression. Overall, 699 (58.9%) experienced Crohn's disease and 488 (41.1%) had ulcerative colitis. Most important predictors for temporary work disability in patients with Crohn's disease included gender, disease duration, disease activity, C-reactive protein level, smoking, depressive symptoms, fistulas, extraintestinal manifestations, and the use of immunosuppressants/steroids. Temporary work disability in patients with ulcerative colitis was associated with age, disease duration, disease activity, and the use of steroids/antibiotics. In all patients, disease activity emerged as the only predictor of permanent work disability. Comparing data at enrollment versus follow-up yielded substantial differences regarding disability and predictors, with follow-up data showing greater predictor effects. We identified predictors of work disability in patients with Crohn's disease and ulcerative colitis. Our findings can help in forecasting these disease courses and guide the choice of appropriate measures to prevent adverse outcomes. Comparing cross-sectional and longitudinal data showed that the conduction of cohort studies is inevitable for the examination of disability.
A temporary home to nurture health: lived experiences of older nursing home residents in Taiwan.
Tsai, Hsiu-Hsin; Tsai, Yun-Fang
2008-07-01
This study explored the lived experiences of older nursing home residents in Taiwan. With more long-term care institutions in Taiwan, older people are more often placed in nursing homes than in the past. Increased understanding of their lived experience is essential to assess residents' needs and determine the effectiveness of nursing interventions. A qualitative design was used to gain a deeper understanding of the lived experiences of older nursing home residents in Taiwan. Focus groups, followed by in-depth interviews, were used to gather information from 33 older residents at eight nursing homes in northern Taiwan. Participants were asked to describe what was important to them and what impressed them most in their daily lives in the nursing home. Participants (24 females and nine males) were on an average 75.3 years old. Verbatim transcripts of audiotaped focus groups and interviews were analysed by thematic analysis via ATLAS.ti software. The core theme of older residents' nursing home experience was 'a temporary home to nurture health'. This core theme was reflected in participants' descriptions of their overall life in the nursing home as a temporary experience to nurture their health. Their everyday experience was characterised by four subthemes: highly structured lifestyle, restricted activities, safety concerns and social interactions. Our findings may enhance policy makers' and healthcare providers' understanding of the lived experience of older nursing home residents, thus guiding the evaluation and development of nursing home services to improve residents' lives. For example, residents with the same characteristics could be placed in the same room or same floor, thus increasing their interactions with other residents. Residents' interactions with family members could also be developed using the Internet or mobile telephones.
Papini, Enrico; Pacella, Claudio M; Misischi, Irene; Guglielmi, Rinaldo; Bizzarri, Giancarlo; Døssing, Helle; Hegedus, Laszlo
2014-08-01
Surgery is the long-established therapeutic option for benign thyroid nodules, which steadily grow and become symptomatic. The cost of thyroid surgery, the risk of temporary or permanent complications, and the effect on quality of life, however, remain relevant concerns. Therefore, various minimally invasive treatments, directed towards office-based management of symptomatic nodules, without requiring general anaesthesia, and with negligible damage to the skin and cervical tissues, have been proposed during the past two decades. Today, ultrasound-guided percutaneous ethanol injection and thermal ablation with laser or radiofrequency have been thoroughly evaluated, and are accessible procedures in specialized centres. In clinical practice, relapsing thyroid cysts are effectively managed with percutaneous ethanol injection treatment, which should be considered therapy of choice. In solid non-functioning thyroid nodules that grow or become symptomatic, trained operators may safely induce, with a single session of laser ablation treatment or radiofrequency ablation, a 50% volume decrease and, in parallel, improve local symptoms. In contrast, hyperfunctioning nodules remain best treated with radioactive iodine, which results in a better control of hyperthyroidism, also in the long-term, and fewer side-effects. Currently, minimally invasive treatment is also investigated for achieving local control of small size neck recurrences of papillary thyroid carcinoma in patients who are poor candidates for repeat cervical lymph node dissection. This particular use should still be considered experimental. Copyright © 2014 Elsevier Ltd. All rights reserved.
Hannah, Keppler; Ingeborg, Dhooge; Leen, Maes; Annelies, Bockstael; Birgit, Philips; Freya, Swinnen; Bart, Vinck
2014-01-01
The objective of the current study was to evaluate the predictive role of the olivocochlear efferent reflex strength in temporary hearing deterioration in young adults exposed to music. This was based on the fact that a noise-protective role of the medial olivocochlear (MOC) system was observed in animals and that efferent suppression (ES) measured using contralateral acoustic stimulation (CAS) of otoacoustic emissions (OAEs) is capable of exploring the MOC system. Knowing an individual's susceptibility to cochlear damage after noise exposure would enhance preventive strategies for noise-induced hearing loss. The hearing status of 28 young adults was evaluated using pure-tone audiometry, transient evoked OAEs (TEOAEs) and distortion product OAEs (DPOAEs) before and after listening to music using an MP3 player during 1 h at an individually determined loud listening level. CAS of TEOAEs was measured before music exposure to determine the amount of ES. Regression analysis showed a distinctive positive correlation between temporary hearing deterioration and the preferred gain setting of the MP3 player. However, no clear relationship between temporary hearing deterioration and the amount of ES was found. In conclusion, clinical measurement of ES, using CAS of TEOAEs, is not correlated with the amount of temporary hearing deterioration after 1 h music exposure in young adults. However, it is possible that the temporary hearing deterioration in the current study was insufficient to activate the MOC system. More research regarding ES might provide more insight in the olivocochlear efferent pathways and their role in auditory functioning.
Simple Words and Fuzzy Zones: Early Directions for Temporary River Research in South Africa
Uys; O'Keeffe
1997-07-01
/ Although a large proportion of South Africa's rivers are nonperennial, ecological research into these systems has only recently been initiated. Consequently, we have little verified information about the ecological functioning of these rivers or knowledge of how best to manage them. High water demands in a semiarid region results in the flow of most perennial rivers being altered from permanent to temporary in sections, through impoundment, land-use changes, abstraction, etc. Conversely, sections of many temporary rivers are altered to perennial as a result of interbasin transfers or may be exploited for surface water. Effective and appropriate management of these modifications must be based on sound scientific information, which requires intensified, directed research. We anticipate that temporary river research in South Africa will, of necessity, be driven primarily by short-term collaborative efforts and secondarily by long-term ecological studies. At the outset, a simple conceptual framework is required to encourage an appreciation of current views of the spatial and temporal dynamics of nonperennial rivers and of the variability and unpredictability that characterize these systems. We adopt the view that perennial and episodic/ephemeral rivers represent either end of a continuum, separated by a suite of intermediate flow regimes. A conceptual diagram of this continuum is presented. In the absence of a functional classification for temporary rivers, a descriptive terminology has been systematically devised in an attempt to standardize definition of the different types of river regimes encountered in the country. Present terminology lacks structure and commonly accepted working definitions. KEY WORDS: Temporary rivers; Intermittent rivers; Continuum; Terminology; Classification; Ecosystem management; South Africa
Code of Federal Regulations, 2011 CFR
2011-07-01
... 32 National Defense 1 2011-07-01 2011-07-01 false Temporary eligibility for access at the top secret levels and temporary eligibility for âQâ access authorization: For someone who is the subject of a... Guidelines for Temporary Access § 147.31 Temporary eligibility for access at the top secret levels and...
Code of Federal Regulations, 2014 CFR
2014-07-01
... 32 National Defense 1 2014-07-01 2014-07-01 false Temporary eligibility for access at the top secret levels and temporary eligibility for âQâ access authorization: For someone who is the subject of a... Guidelines for Temporary Access § 147.31 Temporary eligibility for access at the top secret levels and...
Code of Federal Regulations, 2012 CFR
2012-07-01
... 32 National Defense 1 2012-07-01 2012-07-01 false Temporary eligibility for access at the top secret levels and temporary eligibility for âQâ access authorization: For someone who is the subject of a... Guidelines for Temporary Access § 147.31 Temporary eligibility for access at the top secret levels and...
Code of Federal Regulations, 2013 CFR
2013-07-01
... 32 National Defense 1 2013-07-01 2013-07-01 false Temporary eligibility for access at the top secret levels and temporary eligibility for âQâ access authorization: For someone who is the subject of a... Guidelines for Temporary Access § 147.31 Temporary eligibility for access at the top secret levels and...
Code of Federal Regulations, 2010 CFR
2010-07-01
... Guidelines for Temporary Access § 147.31 Temporary eligibility for access at the top secret levels and... 32 National Defense 1 2010-07-01 2010-07-01 false Temporary eligibility for access at the top secret levels and temporary eligibility for âQâ access authorization: For someone who is the subject of a...
Murai, Yasuo; Adachi, Koji; Takagi, Ryo; Koketsu, Kenta; Matano, Fumihiro; Teramoto, Akira
2011-11-01
The aim of the present study was to assess a new technique of surgical microscope-based indocyanine green (ICG) videoangiography (VAG) to confirm the patency of the anterior communicating artery (AcomA) after clipping AcomA aneurysms. Aneurysmal clipping of five cases of unruptured, broad-neck AcomA aneurysm was performed using the Carl Zeiss Surgical Microscope OPMI Pentero INFRARED 800. In all five patients, after clipping AcomA aneurysms, the patency of AcomA was confirmed using ICGVAG findings and temporary unilateral occlusion of the A1 segment of the anterior cerebral artery using temporary clips. Images were excellent and enabled a real-time surgical assessment because the structures of interest, including vessels, perforating arteries, or residual aneurysm neck, were visible to the surgeon's eye under the microscope in all five patients. ICGVAG and temporary unilateral occlusion with clips provides a simple, reliable, real-time, and rapid intraoperative assessment of the patency of AcomA. This technique may help to improve the quality of neurosurgical procedures. Copyright © 2011 Elsevier Inc. All rights reserved.
42 CFR 438.706 - Special rules for temporary management.
Code of Federal Regulations, 2010 CFR
2010-10-01
... temporary management. (a) Optional imposition of sanction. The State may impose temporary management only if... sanction. The State must impose temporary management (regardless of any other sanction that may be imposed... right to terminate enrollment. (c) Hearing. The State may not delay imposition of temporary management...
Early closure of temporary ileostomy—the EASY trial: protocol for a randomised controlled trial
Correa-Marinez, Adiela; Angenete, Eva; Skullmann, Stefan; Haglind, Eva; Rosenberg, Jacob
2011-01-01
Objective The objective is to evaluate efficiency based on data on morbidity and mortality, health-related quality of life and healthcare-related costs after early reversal of temporary ileostomy after rectal resection for cancer compared with the standard procedure (late reversal). Background Reversal of a temporary ileostomy is generally associated with a low morbidity and mortality. However, ostomy reversal may cause complications requiring reoperation with subsequent major complications, in ranges from 0% to 7–9% and minor complications varying from 4–5% to 30%. Based on studies exploring and describing the time of closure in previous studies which are mostly of low quality, a recent review concluded that closing a temporary stoma within 2 weeks did not seem to be associated with an increase in morbidity and mortality. Design and methods Early closure of temporary ileostomy (EASY), a randomised controlled trial, is a prospective randomised controlled multicentre study which is performed within the framework of the Scandinavian Surgical Outcomes Research Group (http://www.ssorg.net/) and plans to include 200 patients from Danish and Swedish hospitals. The primary end-point of the study is the frequency of complications 0–12 months after surgery (the stoma creation operation). The secondary end-points of the study are (1) comparison of the total costs of the two groups at 6 and 12 months after surgery (stoma creation); (2) comparison of health-related quality of life in the two groups evaluated with the 36-item short-form and European Organization for Research and Treatment of Cancer Quality of Life Questionnaire-CR29/CR30 at 3, 6 and 12 months after surgery (stoma creation); and (3) comparison of disease-specific quality of life in the two groups at 3, 6 and 12 months after surgery (stoma creation). Discussion The aim of the EASY trial is to evaluate the efficiency of early reversal of temporary ileostomy after surgery for rectal cancer versus late reversal. The EASY trial is expected to have a huge impact on patient safety as well as an improvement in patient-reported outcome. Clinical trials identifier NCT01287637. PMID:22021780
42 CFR 488.415 - Temporary management.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 42 Public Health 5 2012-10-01 2012-10-01 false Temporary management. 488.415 Section 488.415... Compliance for Long-Term Care Facilities with Deficiencies § 488.415 Temporary management. (a) Definition. Temporary management means the temporary appointment by CMS or the State of a substitute facility manager or...
42 CFR 488.415 - Temporary management.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 42 Public Health 5 2014-10-01 2014-10-01 false Temporary management. 488.415 Section 488.415... Compliance for Long-Term Care Facilities with Deficiencies § 488.415 Temporary management. (a) Definition. Temporary management means the temporary appointment by CMS or the State of a substitute facility manager or...
42 CFR 488.415 - Temporary management.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 42 Public Health 5 2013-10-01 2013-10-01 false Temporary management. 488.415 Section 488.415... Compliance for Long-Term Care Facilities with Deficiencies § 488.415 Temporary management. (a) Definition. Temporary management means the temporary appointment by CMS or the State of a substitute facility manager or...
42 CFR 488.415 - Temporary management.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 42 Public Health 5 2011-10-01 2011-10-01 false Temporary management. 488.415 Section 488.415... Compliance for Long-Term Care Facilities with Deficiencies § 488.415 Temporary management. (a) Definition. Temporary management means the temporary appointment by CMS or the State of a substitute facility manager or...
5 CFR 213.3199 - Temporary organizations.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Temporary organizations. 213.3199 Section... SERVICE Excepted Schedules Schedule A § 213.3199 Temporary organizations. Positions on the staffs of temporary organizations, as defined in 5 U.S.C. 3161(a). Appointments may not exceed 3 years, but temporary...
48 CFR 37.112 - Government use of private sector temporaries.
Code of Federal Regulations, 2010 CFR
2010-10-01
... use of private sector temporaries. Contracting officers may enter into contracts with temporary help service firms for the brief or intermittent use of the skills of private sector temporaries. Services... part 300, subpart E, Use of Private Sector Temporaries, and agency procedures. [56 FR 55380, Oct. 25...
42 CFR 488.415 - Temporary management.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 5 2010-10-01 2010-10-01 false Temporary management. 488.415 Section 488.415... Compliance for Long-Term Care Facilities with Deficiencies § 488.415 Temporary management. (a) Definition. Temporary management means the temporary appointment by CMS or the State of a substitute facility manager or...
38 CFR 60.7 - Duration of temporary lodging.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 38 Pensions, Bonuses, and Veterans' Relief 2 2011-07-01 2011-07-01 false Duration of temporary lodging. 60.7 Section 60.7 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS AFFAIRS (CONTINUED) FISHER HOUSES AND OTHER TEMPORARY LODGING § 60.7 Duration of temporary lodging. Temporary lodging...
8 CFR 244.14 - Withdrawal of Temporary Protected Status.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 8 Aliens and Nationality 1 2012-01-01 2012-01-01 false Withdrawal of Temporary Protected Status... TEMPORARY PROTECTED STATUS FOR NATIONALS OF DESIGNATED STATES § 244.14 Withdrawal of Temporary Protected Status. (a) Authority of USCIS. USCIS may withdraw the status of an alien granted Temporary Protected...
8 CFR 244.14 - Withdrawal of Temporary Protected Status.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 8 Aliens and Nationality 1 2014-01-01 2014-01-01 false Withdrawal of Temporary Protected Status... TEMPORARY PROTECTED STATUS FOR NATIONALS OF DESIGNATED STATES § 244.14 Withdrawal of Temporary Protected Status. (a) Authority of USCIS. USCIS may withdraw the status of an alien granted Temporary Protected...
8 CFR 244.14 - Withdrawal of Temporary Protected Status.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 8 Aliens and Nationality 1 2013-01-01 2013-01-01 false Withdrawal of Temporary Protected Status... TEMPORARY PROTECTED STATUS FOR NATIONALS OF DESIGNATED STATES § 244.14 Withdrawal of Temporary Protected Status. (a) Authority of USCIS. USCIS may withdraw the status of an alien granted Temporary Protected...
Temporary employment and health: a review.
Virtanen, Marianna; Kivimäki, Mika; Joensuu, Matti; Virtanen, Pekka; Elovainio, Marko; Vahtera, Jussi
2005-06-01
We aimed to review evidence on the relationship between temporary employment and health, and to see whether the association is dependent on outcome measure, instability of employment, and contextual factors. We systematically searched for studies of temporary employment and various health outcomes and critically appraised 27 studies. The review suggests higher psychological morbidity among temporary workers compared with permanent employees. According to some studies, temporary workers also have a higher risk of occupational injuries but their sickness absence is lower. Morbidity may be higher in temporary jobs with high employment instability and in countries with a lower number of temporary workers and unemployed workers. The evidence indicates an association between temporary employment and psychological morbidity. The health risk may depend on instability of temporary employment and the context. Confounding by occupation may have biased some of the studies. Additional research to clarify the role of employment instability, hazard accumulation, and selection is recommended.
Department of Defense Survey of Living Conditions Overseas. 1984. Volume 2. Results.
1985-07-01
with less than 2 years of service) are also now married. 1 This new composition of the Armed Services has both changed the demand for housing and...locations begins with the first move into temporary lodgings upon arrival at the new duty station. These temporary lodgings may be government quarters on...current post, base, or duty station; the second, with the sponsor’s assistance in helping with the incoming family’s adjustment to the new situation. 36
8 CFR 215.9 - Temporary Worker Visa Exit Program.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 8 Aliens and Nationality 1 2011-01-01 2011-01-01 false Temporary Worker Visa Exit Program. 215.9... ALIENS DEPARTING FROM THE UNITED STATES § 215.9 Temporary Worker Visa Exit Program. An alien admitted on certain temporary worker visas at a port of entry participating in the Temporary Worker Visa Exit Program...
8 CFR 215.9 - Temporary Worker Visa Exit Program.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 8 Aliens and Nationality 1 2010-01-01 2010-01-01 false Temporary Worker Visa Exit Program. 215.9... ALIENS DEPARTING FROM THE UNITED STATES § 215.9 Temporary Worker Visa Exit Program. An alien admitted on certain temporary worker visas at a port of entry participating in the Temporary Worker Visa Exit Program...
8 CFR 215.9 - Temporary Worker Visa Exit Program.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 8 Aliens and Nationality 1 2013-01-01 2013-01-01 false Temporary Worker Visa Exit Program. 215.9... ALIENS DEPARTING FROM THE UNITED STATES § 215.9 Temporary Worker Visa Exit Program. An alien admitted on certain temporary worker visas at a port of entry participating in the Temporary Worker Visa Exit Program...
8 CFR 215.9 - Temporary Worker Visa Exit Program.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 8 Aliens and Nationality 1 2012-01-01 2012-01-01 false Temporary Worker Visa Exit Program. 215.9... ALIENS DEPARTING FROM THE UNITED STATES § 215.9 Temporary Worker Visa Exit Program. An alien admitted on certain temporary worker visas at a port of entry participating in the Temporary Worker Visa Exit Program...
8 CFR 215.9 - Temporary Worker Visa Exit Program.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 8 Aliens and Nationality 1 2014-01-01 2014-01-01 false Temporary Worker Visa Exit Program. 215.9... ALIENS DEPARTING FROM THE UNITED STATES § 215.9 Temporary Worker Visa Exit Program. An alien admitted on certain temporary worker visas at a port of entry participating in the Temporary Worker Visa Exit Program...
Novel views of the lithospheric magnetic field for hazard mitigation, tectonics, and geology
NASA Astrophysics Data System (ADS)
Purucker, M. E.; Blakely, R. J.; Nelson, J. B.; Bracken, R.; White, T.
2016-12-01
The altitude of magnetic field observations is critical for high-resolution mapping. We advocate two views of the lithospheric magnetic field, at altitudes of 20 and 90 km. Magnetic surveys are most sensitive to sources with wavelengths comparable to the altitude of the survey. Thus, low-altitude satellite surveys emphasize wavelengths greater than 300 km, such as subduction zones and the continent-ocean contrast. Magnetic sources elongated along satellite tracks are subdued, however, and lithospheric features are obscured in the auroral ovals around the magnetic poles. Near-surface surveys (0.1 to 5 km altitudes) are sensitive to tectonic and upper-crustal geologic sources. There are many under-explored regions, even in this near-surface realm, notably the Antarctic and the southern oceans. Few magnetic surveys are available between airborne ( 5 km) and orbital altitudes ( 300 km), and this lack of information reduces knowledge of geologic and tectonic features in this spectral band; e.g., sources associated with the lower crust or that encompass the whole crust are strongly suppressed because the average thickness of continental crust is 30 km. Technologies are being developed to acquire magnetic field information at suborbital altitudes with UAVs at altitudes of 20 km, and with a laser guide star technique for remote sensing at an altitude averaging 90 km. Use of the laser guide star technique on a polar-orbiting satellite with in-situ magnetometers would greatly facilitate separating ionospheric from lithospheric fields. Laser guide stars can be produced in Na-rich layers where micro-meteorite breakup occurs in a planetary or satellite system, and they are ubiquitous in the Solar System. The ideal observation platform at 20 km has small and well-characterized EM fields, can execute maneuvers that permit flying of tie lines, and can fly for long periods so as to survey large areas. A main limitation of surveying remote areas concerns the need for a local base station for resolving temporal-spatial aliasing. The traditional approach of siting temporary base stations in the survey area is often not feasible, and we discuss possible alternatives.
A study on setting of the fatigue limit of temporary dental implants.
Kim, M H; Cho, E J; Lee, J W; Kim, E K; Yoo, S H; Park, C W
2017-07-01
A temporary dental implant is a medical device which is temporarily used to support a prosthesis such as an artificial tooth used for restoring patient's masticatory function during implant treatment. It is implanted in the oral cavity to substitute for the role of tooth. Due to the aging and westernization of current Korean society, the number of tooth extraction and implantation procedures is increasing, leading to an increase in the use and development of temporary dental implants. Because an implant performs a masticatory function in place of a tooth, a dynamic load is repeatedly put on the implant. Thus, the fatigue of implants is reported to be the most common causes of the fracture thereof. According to the investigation and analysis of the current domestic and international standards, the standard for fatigue of implant fixtures is not separately specified. Although a test method for measuring the fatigue is suggested in an ISO standard, it is a standard for permanent dental implants. Most of the test standards for Korean manufacturers and importers apply 250 N or more based on the guidance for the safety and performance evaluation of dental implants. Therefore, this study is intended to figure out the fatigue standard which can be applied to temporary dental implants when measuring the fatigue according to the test method suggested in the permanent dental implant standard. The results determined that suitable fatigue standards of temporary dental implants should be provided by each manufacturer rather than applying 250 N. This study will be useful for the establishment of the fatigue standards and fatigue test methods of the manufacturers and importers of temporary dental implants.
Cid, N; Verkaik, I; García-Roger, E M; Rieradevall, M; Bonada, N; Sánchez-Montoya, M M; Gómez, R; Suárez, M L; Vidal-Abarca, M R; Demartini, D; Buffagni, A; Erba, S; Karaouzas, I; Skoulikidis, N; Prat, N
2016-01-01
Many streams in the Mediterranean Basin have temporary flow regimes. While timing for seasonal drought is predictable, they undergo strong inter-annual variability in flow intensity. This high hydrological variability and associated ecological responses challenge the ecological status assessment of temporary streams, particularly when setting reference conditions. This study examined the effects of flow connectivity in aquatic macroinvertebrates from seven reference temporary streams across the Mediterranean Basin where hydrological variability and flow conditions are well studied. We tested for the effect of flow cessation on two streamflow indices and on community composition, and, by performing random forest and classification tree analyses we identified important biological predictors for classifying the aquatic state either as flowing or disconnected pools. Flow cessation was critical for one of the streamflow indices studied and for community composition. Macroinvertebrate families found to be important for classifying the aquatic state were Hydrophilidae, Simuliidae, Hydropsychidae, Planorbiidae, Heptageniidae and Gerridae. For biological traits, trait categories associated to feeding habits, food, locomotion and substrate relation were the most important and provided more accurate predictions compared to taxonomy. A combination of selected metrics and associated thresholds based on the most important biological predictors (i.e. Bio-AS Tool) were proposed in order to assess the aquatic state in reference temporary streams, especially in the absence of hydrological data. Although further development is needed, the tool can be of particular interest for monitoring, restoration, and conservation purposes, representing an important step towards an adequate management of temporary rivers not only in the Mediterranean Basin but also in other regions vulnerable to the effects of climate change. Copyright © 2015 Elsevier B.V. All rights reserved.
Sieg, Adam; Mardis, B Andrew; Mardis, Caitlin R; Huber, Michelle R; New, James P; Meadows, Holly B; Cook, Jennifer L; Toole, J Matthew; Uber, Walter E
2015-01-01
Because of the complexities associated with anticoagulation in temporary percutaneous ventricular assist device (pVAD) recipients, a lack of standardization exists in their management. This retrospective analysis evaluates current anticoagulation practices at a single center with the aim of identifying an optimal anticoagulation strategy and protocol. Patients were divided into two cohorts based on pVAD implanted (CentriMag (Thoratec; Pleasanton, CA) / TandemHeart (CardiacAssist; Pittsburgh, PA) or Impella (Abiomed, Danvers, MA)), with each group individually analyzed for bleeding and thrombotic complications. Patients in the CentriMag/TandemHeart cohort were subdivided based on the anticoagulation monitoring strategy (activated partial thromboplastin time (aPTT) or antifactor Xa unfractionated heparin (anti-Xa) values). In the CentriMag/TandemHeart cohort, there were five patients with anticoagulation titrated based on anti-Xa values; one patient developed a device thrombosis and a major bleed, whereas another patient experienced major bleeding. Eight patients received an Impella pVAD. Seven total major bleeds in three patients and no thrombotic events were detected. Based on distinct differences between the devices, anti-Xa values, and outcomes, two protocols were created to guide anticoagulation adjustments. However, anticoagulation in patients who require pVAD support is complex with constantly evolving anticoagulation goals. The ideal level of anticoagulation should be individually determined using several coagulation laboratory parameters in concert with hemodynamic changes in the patient's clinical status, the device, and the device cannulation.
Kompier, Michiel; Ybema, Jan Fekke; Janssen, Julia; Taris, Toon
2009-01-01
The aim of this study was to enhance (i) insight in the relationship between different types of employment contract and the quality of working life, health and well-being, and (ii) our causal understanding of these relationships by comparing employees whose contract type changes across time. Analyses were based on a two-year prospective cohort study. Cross-sectional analyses were based upon a sample of 2,454 Dutch employees (2004). Longitudinal data were available for 1,865 respondents (2004-2006). We distinguished among 5 contract types, and subgroups of 'Upward' (i.e., towards permanent employment) and 'Downward' (towards temporary employment) movers across time. Data were analysed with analysis of variance and cross table analysis. Cross-sectionally, we found differences between contract types in quality of working life: generally permanent employees had better jobs, whereas temporary agency workers and on call workers had more 'bad work characteristics'. We also found a difference in health behaviour (smoking) and that psychological health was worst among temporary agency workers. In longitudinal analyses we found some evidence that a positive change in employment contract was associated with a better quality of working life and better psychological health, whereas the opposite was true for a negative contract change. The quality of working life, health and well-being are unequally distributed over employment contract groups. Temporary agency workers and on-call workers deserve special attention in terms of job design and human resource management.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-04
... to Tree Cutting and Wood Harvesting on Public Land in Douglas County, NV AGENCY: Bureau of Land... a temporary closure to wood harvesting and/or tree cutting on public land within the Topaz Ranch... temporary restriction of cross-country vehicle travel and a temporary closure to tree cutting and wood...
Tzoraki, Ourania A; Dörflinger, Gerald; Kathijotes, Nicholas; Kontou, Artemis
2014-01-01
The water quality status of the Kouris river in Cyprus was examined in order to fulfil the requirements for ecological quality as defined by the Water Framework Directive-2000/60/EC. Nitrate concentration (mean value) was increased in the Limnatis (2.8 mg L(-1)) tributary in comparison with the Kryos (2.1 mg L(-1)) and Kouris (1.0 mg L(-1)) tributaries depicting the influence of anthropogenic activities. The total maximum daily nutrients loads (TMDLs) based on the flow duration curves approach, showed that nutrients loads exceeded threshold values (33.3-75.6% in all hydrologic condition classes in the Kouris tributary, and 65-78% in the Limnatis tributary) especially under low flow conditions. The TMDL graph is intended to guide the temporal schedule for chemical sampling in all hydrologic classes. Kouris reservoir is an oligotrophic system, strongly influenced by the river's flash-flood character but also by the implemented management practices. Kouris river outflow, which was reduced to one-tenth in the post dam period altered the wetland hydrologic network and contributed to the decrease of aquifer thickness. Continuous evaluation and update of the River Basin Management Plans will be the basis for the sustainable development of the Kouris basin.
[Psychological contract in the light of flexible employment: The review of studies].
Żołnierczyk-Zreda, Dorota
Changing employment relations between employees and employers due to the increasing employment flexibility have contributed to the development of a new paradigm to analyze these relations based on the concept of psychological contract. This paradigm might be particularly relevant in Poland where the employment flexibility understood as the number of workers with temporary contracts is the highest in Europe. In this paper the concept of psychological contract is presented along with the existing findings related to its range, balance and contract fulfilment vs. contract breach. The results of studies showing the differences in psychological contract of temporary and permanent workers are also presented. The majority of them indicate that psychological contracts of temporary workers are limited in their extent, less balanced and asymmetric (to workers' disadvantage), as well as more transactional in their nature than those of permanent workers. The temporary workers' well-being and attitudes towards work and their reaction to psychological contract breach largely depends on their preferences for this type of employment, on their qualifications and on a labor market situation. Med Pr 2016;67(4):529-536. This work is available in Open Access model and licensed under a CC BY-NC 3.0 PL license.
A New Great Game: US-China Competition in Guam and the CNMI
2017-06-01
H-2B (temporary non- agricultural workers) visas is capped annually at a pre- 9 Report of the Visa...and the Economic Outlook 13 “H-2B Temporary Non- Agricultural Workers,” US Citizenship and Immigration...Services, November 2016, https://www.uscis.gov/working-united-states/temporary- workers/h-2b-temporary-non- agricultural -workers. 14 “H-2B Temporary
Babu, Harish; Lagman, Carlito; Kim, Terrence T.; Grode, Marshall; Johnson, J. Patrick; Drazin, Doniel
2017-01-01
Background: Bertolotti's syndrome is characterized by enlargement of the transverse process at the most caudal lumbar vertebra with a pseudoarticulation between the transverse process and sacral ala. Here, we describe the use of intraoperative three-dimensional image-guided navigation in the resection of anomalous transverse processes in two patients with Bertolotti's syndrome. Case Descriptions: Two patients diagnosed with Bertolotti's syndrome who had undergone the above-mentioned procedure were identified. The patients were 17- and 38-years-old, and presented with severe, chronic low back pain that was resistant to conservative treatment. Imaging revealed lumbosacral transitional vertebrae at the level of L5-S1, which was consistent with Bertolotti's syndrome. Injections of the pseudoarticulations resulted in only temporary symptomatic relief. Thus, the patients subsequently underwent O-arm neuronavigational resection of the bony defects. Both patients experienced immediate pain resolution (documented on the postoperative notes) and remained asymptomatic 1 year later. Conclusion: Intraoperative three-dimensional imaging and navigation guidance facilitated the resection of anomalous transverse processes in two patients with Bertolotti's syndrome. Excellent outcomes were achieved in both patients. PMID:29026672
Babu, Harish; Lagman, Carlito; Kim, Terrence T; Grode, Marshall; Johnson, J Patrick; Drazin, Doniel
2017-01-01
Bertolotti's syndrome is characterized by enlargement of the transverse process at the most caudal lumbar vertebra with a pseudoarticulation between the transverse process and sacral ala. Here, we describe the use of intraoperative three-dimensional image-guided navigation in the resection of anomalous transverse processes in two patients with Bertolotti's syndrome. Two patients diagnosed with Bertolotti's syndrome who had undergone the above-mentioned procedure were identified. The patients were 17- and 38-years-old, and presented with severe, chronic low back pain that was resistant to conservative treatment. Imaging revealed lumbosacral transitional vertebrae at the level of L5-S1, which was consistent with Bertolotti's syndrome. Injections of the pseudoarticulations resulted in only temporary symptomatic relief. Thus, the patients subsequently underwent O-arm neuronavigational resection of the bony defects. Both patients experienced immediate pain resolution (documented on the postoperative notes) and remained asymptomatic 1 year later. Intraoperative three-dimensional imaging and navigation guidance facilitated the resection of anomalous transverse processes in two patients with Bertolotti's syndrome. Excellent outcomes were achieved in both patients.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Unneberg, L.
The main features of the 16 core grids (top guides) designed by ABB ATOM AB are briefly described and the evolution of the design is discussed. One important characteristic of the first nine grids is the existence of bolts securing guide bars to the core grid plates. These bolts are made of precipitation hardened or solution annealed stainless steel. During operation, bolts in all none grids have cracked. The failure analyses indicate that intergranular stress corrosion cracking (IGSCC), possibly accelerated by crevice conditions and/or irradiation, was the cause of failure. Fast neutron fluences approaching or exceeding the levels considered asmore » critical for irradiation assisted stress corrosion cracking (IASCC) will be reached in a few cases only. Temporary measures were taken immediately after the discovery of the cracking. For five of the nine reactors affected, it was decided to replace the complete grids. Two of these replacements have been successfully carried out to date. IASCC as a potential future problem is discussed and it is pointed out that, during their life times, the ABB ATOM core grids will be exposed to sufficiently high fast neutron fluences to cause some concern.« less
Gallart, F; Llorens, P; Latron, J; Cid, N; Rieradevall, M; Prat, N
2016-09-15
Hydrological data for assessing the regime of temporary rivers are often non-existent or scarce. The scarcity of flow data makes impossible to characterize the hydrological regime of temporary streams and, in consequence, to select the correct periods and methods to determine their ecological status. This is why the TREHS software is being developed, in the framework of the LIFE Trivers project. It will help managers to implement adequately the European Water Framework Directive in this kind of water body. TREHS, using the methodology described in Gallart et al. (2012), defines six transient 'aquatic states', based on hydrological conditions representing different mesohabitats, for a given reach at a particular moment. Because of its qualitative nature, this approach allows using alternative methodologies to assess the regime of temporary rivers when there are no observed flow data. These methods, based on interviews and high-resolution aerial photographs, were tested for estimating the aquatic regime of temporary rivers. All the gauging stations (13) belonging to the Catalan Internal Catchments (NE Spain) with recurrent zero-flow periods were selected to validate this methodology. On the one hand, non-structured interviews were conducted with inhabitants of villages near the gauging stations. On the other hand, the historical series of available orthophotographs were examined. Flow records measured at the gauging stations were used to validate the alternative methods. Flow permanence in the reaches was estimated reasonably by the interviews and adequately by aerial photographs, when compared with the values estimated using daily flows. The degree of seasonality was assessed only roughly by the interviews. The recurrence of disconnected pools was not detected by flow records but was estimated with some divergences by the two methods. The combination of the two alternative methods allows substituting or complementing flow records, to be updated in the future through monitoring by professionals and citizens. Copyright © 2016 Elsevier B.V. All rights reserved.
Quyn, A J; Johnston, C; Hall, D; Chambers, A; Arapova, N; Ogston, S; Amin, A I
2012-08-01
Several techniques for temporary abdominal closure have been developed. We systematically review the literature on temporary abdominal closure to ascertain whether the method can be tailored to the indication. Medline, Embase, the Cochrane Central Register of Controlled Trials and relevant meeting abstracts until December 2009 were searched using the following headings: open abdomen, laparostomy, VAC (vacuum assisted closure), TNP (topical negative pressure), fascial closure, temporary abdominal closure, fascial dehiscence and deep wound dehiscence. The data were analysed by closure technique and aetiology. The primary end-points included delayed fascial closure and in-hospital mortality. The secondary end-points were intra-abdominal complications. The search identified 106 papers for inclusion. The techniques described were VAC (38 series), mesh/sheet (30 series), packing (15 series), Wittmann patch (eight series), Bogotá bag (six series), dynamic retention sutures (three series), zipper (15 series), skin only and locking device (one series each). The highest facial closure rates were seen with the Wittmann patch (78%), dynamic retention sutures (71%) and VAC (61%). Temporary abdominal closure has evolved from simple packing to VAC based systems. In the absence of sepsis Wittmann patch and VAC offered the best outcome. In its presence VAC had the highest delayed primary closure and the lowest mortality rates. However, due to data heterogeneity only limited conclusions can be drawn from this analysis. © 2012 The Authors. Colorectal Disease © 2012 The Association of Coloproctology of Great Britain and Ireland.
Predictors of temporary epicardial pacing wires use after valve surgery
2014-01-01
Background Although temporary cardiac pacing is infrequently needed, temporary epicardial pacing wires are routinely inserted after valve surgery. As they are associated with infrequent, but life threatening complications, and the decreased need for postoperative pacing in a group of low risk patients; this study aims to identify the predictors of temporary cardiac pacing after valve surgery. Methods A retrospective analysis of data collected prospectively on 400 consecutive valve surgery patients between May 2002 and December 2012 was performed. Patients were grouped according to avoidance or insertion of temporary pacing wires, and were further subdivided according to temporary cardiac pacing need. Multiple logistic regression was used to determine the predictors of temporary cardiac pacing. Results 170 (42.5%) patients did not have insertion of temporary pacing wires and none of them needed temporary pacing. 230 (57.5%) patients had insertion of temporary pacing wires and among these, only 55 (23.9%) required temporary pacing who were compared with the remaining 175 (76.1%) patients in the main analysis. The determinants of temporary cardiac pacing (adjusted odds ratios; 95% confidence interval) were as follows: increased age (1.1; 1.1, 1.3, p = 0.002), New York Heart Association class III- IV (5.6; 1.6, 20.2, p = 0.008) , pulmonary artery pressure ≥ 50 mmHg (22.0; 3.4, 142.7, p = 0.01), digoxin use (8.0; 1.3, 48.8, p = 0.024), multiple valve surgery (13.5; 1.5, 124.0, p = 0.021), aorta cross clamp time ≥ 60 minutes (7.8; 1.6, 37.2, p = 0.010), and valve annulus calcification (7.9; 2.0, 31.7, p = 0.003). Conclusion Although limited by sample size, the present results suggest that routine use of temporary epicardial pacing wires after valve surgery is only necessary for high risk patients. Preoperative identification and aggressive management of predictors of temporary cardiac pacing and the possible modulation of intraoperative techniques can decrease the need of temporary cardiac pacing. Prospective randomized controlled studies on a larger number of patients are necessary to draw solid conclusions regarding the selective use of temporary epicardial pacing wires in valve surgery. PMID:24521215
Kendall, W.L.; Nichols, J.D.; North, P.M.; Nichols, J.D.
1995-01-01
The use of the Cormack- Jolly-Seber model under a standard sampling scheme of one sample per time period, when the Jolly-Seber assumption that all emigration is permanent does not hold, leads to the confounding of temporary emigration probabilities with capture probabilities. This biases the estimates of capture probability when temporary emigration is a completely random process, and both capture and survival probabilities when there is a temporary trap response in temporary emigration, or it is Markovian. The use of secondary capture samples over a shorter interval within each period, during which the population is assumed to be closed (Pollock's robust design), provides a second source of information on capture probabilities. This solves the confounding problem, and thus temporary emigration probabilities can be estimated. This process can be accomplished in an ad hoc fashion for completely random temporary emigration and to some extent in the temporary trap response case, but modelling the complete sampling process provides more flexibility and permits direct estimation of variances. For the case of Markovian temporary emigration, a full likelihood is required.
Environmental testing of CIS based modules
DOE Office of Scientific and Technical Information (OSTI.GOV)
Willett, D.
1995-11-01
This report describes environmental testing of Siemen`s CIS modules. Charts and diagrams are presented on data concerning: temporary power loss of laminated mini-modules; the 50 thermal cycle test; the 10 humidity freeze cycle test; results after 1000 hours of exposure to damp heat; and interconnect test structures in damp heat testing. It is concluded that moisture ingress causes permanent increases in the series resistance of modules, and that improved packaging is needed for better high humidity reliability. Also, dry dark heat caused temporary power losses which were recovered in sunlight.
Saeidi, Nima; Guo, Xiaoqing; Hutcheon, Audrey E K; Sander, Edward A; Bale, Shyam Sundar; Melotti, Suzanna A; Zieske, James D; Trinkaus-Randall, Vickery; Ruberti, Jeffrey W
2012-10-01
Many tissue engineering applications require the remodeling of a degradable scaffold either in vitro or in situ. Although inefficient remodeling or failure to fully remodel the temporary matrix can result in a poor clinical outcome, very few investigations have examined in detail, the interaction of regenerative cells with temporary scaffoldings. In a recent series of investigations, randomly oriented collagen gels were directly implanted into human corneal pockets and followed for 24 months. The resulting remodeling response exhibited a high degree of variability which likely reflects differing regenerative/synthetic capacity across patients. Given this variability, we hypothesize that a disorganized, degradable provisional scaffold could be disruptive to a uniform, organized reconstruction of stromal matrix. In this investigation, two established corneal stroma tissue engineering culture systems (collagen scaffold-based and scaffold-free) were compared to determine if the presence of the disorganized collagen gel influenced matrix production and organizational control exerted by primary human corneal fibroblast cells (PHCFCs). PHCFCs were cultured on thin disorganized reconstituted collagen substrate (RCS--five donors: average age 34.4) or on a bare polycarbonate membrane (five donors: average age 32.4 controls). The organization and morphology of the two culture systems were compared over the long-term at 4, 8, and 11/12 weeks. Construct thickness and extracellular matrix organization/alignment was tracked optically with bright field and differential interference contrast (DIC) microscopy. The details of cell/matrix morphology and cell/matrix interaction were examined with standard transmission, cuprolinic blue and quick-freeze/deep-etch electron microscopy. Both the scaffold-free and the collagen-based scaffold cultures produced organized arrays of collagen fibrils. However, at all time points, the amount of organized cell-derived matrix in the scaffold-based constructs was significantly lower than that produced by scaffold-free constructs (controls). We also observed significant variability in the remodeling of RCS scaffold by PHCFCs. PHCFCs which penetrated the RCS scaffold did exert robust local control over secreted collagen but did not appear to globally reorganize the scaffold effectively in the time period of the study. Consistent with our hypothesis, the results demonstrate that the presence of the scaffold appears to interfere with the global organization of the cell-derived matrix. The production of highly organized local matrix by fibroblasts which penetrated the scaffold suggests that there is a mechanism which operates close to the cell membrane capable of controlling fibril organization. Nonetheless, the local control of the collagen alignment produced by cells within the scaffold was not continuous and did not result in overall global organization of the construct. Using a disorganized scaffold as a guide to produce highly organized tissue has the potential to delay the production of useful matrix or prevent uniform remodeling. The results of this study may shed light on the recent attempts to use disorganized collagenous matrix as a temporary corneal replacement in vivo which led to a variable remodeling response. Copyright © 2012 Wiley Periodicals, Inc.
Saeidi, Nima; Guo, Xiaoqing; Hutcheon, Audrey E. K.; Sander, Edward A.; Bale, Shyam Sundar; Melotti, Suzanna A.; Zieske, James D.; Trinkaus-Randall, Vickery; Ruberti, Jeffrey W.
2013-01-01
Many tissue engineering applications require the remodeling of a degradable scaffold either in vitro or in situ. Although inefficient remodeling or failure to fully remodel the temporary matrix can result in a poor clinical outcome, very few investigations have examined in detail, the interaction of regenerative cells with temporary scaffoldings. In a recent series of investigations, randomly oriented collagen gels were directly implanted into human corneal pockets and followed for 24 months. The resulting remodeling response exhibited a high degree of variability which likely reflects differing regenerative/synthetic capacity across patients. Given this variability, we hypothesize that a disorganized, degradable provisional scaffold could be disruptive to a uniform, organized reconstruction of stromal matrix. In this investigation, two established corneal stroma tissue engineering culture systems (collagen scaffold-based and scaffold-free) were compared to determine if the presence of the disorganized collagen gel influenced matrix production and organizational control exerted by primary human corneal fibroblast cells (PHCFCs). PHCFCs were cultured on thin disorganized reconstituted collagen substrate (RCS - 5 donors: average age 34.4) or on a bare polycarbonate membrane (5 donors: average age 32.4-controls). The organization and morphology of the two culture systems were compared over the long-term at 4, 8 and 11/12 weeks. Construct thickness and extracellular matrix organization/alignment was tracked optically with bright field and differential interference contrast (DIC) microscopy. The details of cell/matrix morphology and cell/matrix interaction were examined with standard transmission, cuprolinic blue and quick-freeze/deep-etch electron microscopy. Both the scaffold-free and the collagen-based scaffold cultures produced organized arrays of collagen fibrils. However, at all time points, the amount of organized cell-derived matrix in the scaffold-based constructs was significantly lower than that produced by scaffold-free constructs (controls). We also observed significant variability in the remodeling of RCS scaffold by PHCFCs. PHCFCs which penetrated the RCS scaffold did exert robust local control over secreted collagen but did not appear to globally reorganize the scaffold effectively in the time period of the study. Consistent with our hypothesis, the results demonstrate that the presence of the scaffold appears to interfere with the global organization of the cell-derived matrix. The production of highly-organized local matrix by fibroblasts which penetrated the scaffold suggests that there is a mechanism which operates close to the cell membrane capable of control fibril organization. Nonetheless, the local control of the collagen alignment produced by cells within the scaffold was not continuous and did not result in overall global organization of the construct. Using a disorganized scaffold as a guide to produce highly-organized tissue has the potential to delay the production of useful matrix or prevent uniform remodeling. The results of this study may shed light on the recent attempts to use disorganized collagenous matrix as a temporary corneal replacement in vivo which led to a variable remodeling response. PMID:22528405
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-10
...] Agency Information Collection Activities; Proposed Collection; Comment Request; Temporary Marketing... existing FDA regulations governing temporary marketing permit applications. DATES: Submit either electronic... appropriate, and other forms of information technology. Temporary Marketing Permit Applications--21 CFR 130.17...
The Lived Experiences of Persons Hospitalized for Construction of an Urgent Fecal Ostomy.
Herlufsen, Per; Brødsgaard, Anne
The purpose of this study was to describe the lived experiences of hospital stays for patients undergoing urgent ostomy surgery. Qualitative, descriptive, phenomenological study. Six persons undergoing acute hospital admission and urgent ileostomy or colostomy surgery (either permanent or temporary) participated in the study. Participants were of Danish ethnicity and between the ages of 48 and 75 years. The research setting was the surgical department at a university hospital in the Capital Region of Denmark. Data collection and analyses were guided by a Reflective Lifeworld Research approach; this approach is based on phenomenological philosophy. Data were collected during in-depth interviews using a semistructured interview guide. Their average length was 50 minutes (range, 30-65 minutes). Interviews were digitally recorded and transcribed. Transcriptions were analyzed in 4 phases according to the principles of Reflective Lifeworld Research. The phenomenon we labeled "lived experiences of acute hospitalization with construction of an urgent unplanned fecal ostomy" comprised 4 constituents: (1) undergoing unexpected bodily changes, (2) partnership with professional caregivers, (3) experience of vulnerability, and (4) a lack of continuity. These constituents can be described as a number of challenges due to both hospitalization and ostomy creation. We found that individuals experience a number of challenges due to acute hospitalization and urgent construction of a fecal ostomy. These challenges are due to the unexpected bodily changes and interpersonal and organizational conditions. Nurses should be aware of not only the physical implications of urgent creation of a fecal ostomy but also the individual and psychological implications of this event.
Takimoto, Masayuki; Ishii, Ryo; Iino, Masayoshi; Shimizu, Yusuke; Tsujimoto, Akimasa; Takamizawa, Toshiki; Ando, Susumu; Miyazaki, Masashi
2012-02-01
The surface free energy and dentine bond strength of self-adhesive cements were examined after the removal of temporary cements. The labial dentine surfaces of bovine mandibular incisors were wet ground with #600-grit SiC paper. Acrylic resin blocks were luted to the prepared dentine surfaces using HY Bond Temporary Cement Hard (HY), IP Temp Cement (IP), Fuji TEMP (FT) or Freegenol Temporary Cement (TC), and stored for 1 week. After removal of the temporary cements with an ultrasonic tip, the contact angle values of five specimens per test group were determined for the three test liquids, and the surface-energy parameters of the dentine surfaces were calculated. The dentine bond strengths of the self-adhesive cements were measured after removal of the temporary cements in a shear mode at a crosshead speed of 1.0mm/min. The data were subjected to one-way analysis of variance (ANOVA) followed by Tukey's HSD test. For all surfaces, the value of the estimated surface tension component γ(S)(d) (dispersion) was relatively constant at 41.7-43.3 mJm(-2). After removal of the temporary cements, the value of the γ(S)(h) (hydrogen-bonding) component decreased, particularly with FT and TC. The dentine bond strength of the self-adhesive cements was significantly higher for those without temporary cement contamination (8.2-10.6 MPa) than for those with temporary cement contamination (4.3-7.1 MPa). The γ(S) values decreased due to the decrease of γ(S)(h) values for the temporary cement-contaminated dentine. Contamination with temporary cements led to lower dentine bond strength. The presence of temporary cement interferes with the bonding performance of self-adhesive cements to dentine. Care should be taken in the methods of removal of temporary cement when using self-adhesive cements. Copyright © 2011 Elsevier Ltd. All rights reserved.
Temporary stream and wetland crossing options for forest management.
Charles R. Blinn; Rick Dahlman; Lola Hislop; Michael A. Thompson
1998-01-01
Discusses temporary options for crossing streams and wetland soils with forest harvesting and transportation equipment. Reviews the available literature on the environmental effects of temporary crossings. Provides an overview of regulations pertaining to temporary crossings for several jurisdictions in the Great Lakes Region.
Temporary stream and wetland crossing options for forest management
Charles R. Blinn; Rick Dahlman; Lola Hislop; Michael A. Thompson
1998-01-01
Discusses temporary options for crossing streams and wetland soils with forest harvesting and transportation equipment. Reviews the available literature on the environmental effects of temporary crossings. Provides an overview of regulations pertaining to temporary crossings for several jurisdictions in the Great Lakes Region.
21 CFR 1210.24 - Temporary permits.
Code of Federal Regulations, 2011 CFR
2011-04-01
... and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED... FEDERAL IMPORT MILK ACT Permit Control § 1210.24 Temporary permits. A temporary permit will be granted... inspections required by the applicable provisions of section 2 of the Federal Import Milk Act. Temporary...
21 CFR 1210.24 - Temporary permits.
Code of Federal Regulations, 2010 CFR
2010-04-01
... and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED... FEDERAL IMPORT MILK ACT Permit Control § 1210.24 Temporary permits. A temporary permit will be granted... inspections required by the applicable provisions of section 2 of the Federal Import Milk Act. Temporary...
14 CFR 47.16 - Temporary registration numbers.
Code of Federal Regulations, 2010 CFR
2010-01-01
... AIRCRAFT REGISTRATION General § 47.16 Temporary registration numbers. (a) Temporary registration numbers... Registration Certificates for temporary display on aircraft during flight allowed under Subpart C of this part. (b) The holder of a Dealer's Aircraft Registration Certificate may apply to the FAA Aircraft Registry...
14 CFR 47.16 - Temporary registration numbers.
Code of Federal Regulations, 2012 CFR
2012-01-01
... AIRCRAFT REGISTRATION General § 47.16 Temporary registration numbers. (a) Temporary registration numbers... Registration Certificates, AC Form 8050-6, for temporary display on aircraft during flight allowed under Subpart C of this part. (b) The holder of a Dealer's Aircraft Registration Certificate may apply to the...
14 CFR 47.16 - Temporary registration numbers.
Code of Federal Regulations, 2011 CFR
2011-01-01
... AIRCRAFT REGISTRATION General § 47.16 Temporary registration numbers. (a) Temporary registration numbers... Registration Certificates, AC Form 8050-6, for temporary display on aircraft during flight allowed under Subpart C of this part. (b) The holder of a Dealer's Aircraft Registration Certificate may apply to the...
14 CFR 47.16 - Temporary registration numbers.
Code of Federal Regulations, 2013 CFR
2013-01-01
... AIRCRAFT REGISTRATION General § 47.16 Temporary registration numbers. (a) Temporary registration numbers... Registration Certificates, AC Form 8050-6, for temporary display on aircraft during flight allowed under Subpart C of this part. (b) The holder of a Dealer's Aircraft Registration Certificate may apply to the...
14 CFR 47.16 - Temporary registration numbers.
Code of Federal Regulations, 2014 CFR
2014-01-01
... AIRCRAFT REGISTRATION General § 47.16 Temporary registration numbers. (a) Temporary registration numbers... Registration Certificates, AC Form 8050-6, for temporary display on aircraft during flight allowed under Subpart C of this part. (b) The holder of a Dealer's Aircraft Registration Certificate may apply to the...
Managing manpower and cutting costs in the health care industry.
Kocakülâh, Mehmet C; Wiggins, Laura M; Albin, Marvin
2009-01-01
The Bureau of Labor Statistics projects that health care services will account for one out of every six new jobs from 2002 to 2012. Based upon workload fluctuations, some companies in health care have opted to utilize "just-in-time" employees. Such an employee not only serves to stabilize the workforce but can also reduce employers' cost by allowing them to pay for labor only when they need it. Based on the analysis, a company should reduce reliance on casual staff, as the upfront cost per hire is far greater than hiring a temporary employee. Information presented points to fairly high turnover among casual employees, thus bolstering the argument against this staffing scheme when compared with temporary employee staffing.
Rolland, Benjamin; Deheul, Sylvie; Danel, Thierry; Bence, Camille; Blanquart, Marie-Christine; Bonord, Alexandre; Semal, Robin; Briand, Thierry; Sochala, Michel; Dubocage, Christelle; Dupriez, François; Duquesne, Damien; Gibour, Bernard; Loosfeld, Xavier; Henebelle, Dorothée; Henon, Michael; Vernalde, Elodie; Matton, Christian; Bacquet, Jean-Eudes; Molmy, Lucie; Sarasy, François; Simioni, Nicolas; Richez, Cécile; Gentil-Spinosi, Laure; Vosgien, Véronique; Yguel, Jacques; Ledent, Thierry; Auffret, Marine; Wilquin, Maroussia; Ziolkowski, Danièle; Sochala, Michel; Gautier, Sophie; Bordet, Régis; Cottencin, Olivier
2015-01-01
The use of high dose baclofen for alcohol-dependence emerged in France from 2008 based on empirical findings, and is still off-label. However, due to the rapid increase in this prescribing practice, the French health authorities have decided to frame it using an extraordinary regulatory measure named "temporary recommendation for use" (TRU). Baclofen prescribers from CAMTEA, a regional team-based off-label system for supervising baclofen prescribing, which was developed much prior to the TRU, discuss herein the pros and cons of this measure and the applicability of its different aspects in the daily clinical practice. © 2014 Société Française de Pharmacologie et de Thérapeutique.
[Orthodontics--periodontics: yesterday and today; a review of the literature].
Reichert, Christoph; Kasaj, Adrian; Willershausen, Brita
2009-01-01
The dental disciplines of orthodontics and periodontics keep a variety of contact points. The development of new treatment options in periodontics and orthodontics, e.g., guided tissue regeneration or orthodontic implants for temporary skeletal anchorage, offer new ways in treatment of periodontally affected patients. The present work is a review of studies and treatment plans in the past thirty years and scrutinises their topicality and evidence. The performance of a systematic review of literature led to a low number of resulting articles. For this reason and their heterogeneity it was not possible to perform a quantifying review. Our results lead to the conclusion that this certain scope of interdisciplinary therapy has further demand for studies with high quality standards and evidence.
49 CFR 193.2019 - Mobile and temporary LNG facilities.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 3 2011-10-01 2011-10-01 false Mobile and temporary LNG facilities. 193.2019... LIQUEFIED NATURAL GAS FACILITIES: FEDERAL SAFETY STANDARDS General § 193.2019 Mobile and temporary LNG facilities. (a) Mobile and temporary LNG facilities for peakshaving application, for service maintenance...
40 CFR 264.553 - Temporary Units (TU).
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 26 2011-07-01 2011-07-01 false Temporary Units (TU). 264.553 Section 264.553 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED... Provisions for Cleanup § 264.553 Temporary Units (TU). (a) For temporary tanks and container storage areas...
40 CFR 264.553 - Temporary Units (TU).
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Temporary Units (TU). 264.553 Section 264.553 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED... Provisions for Cleanup § 264.553 Temporary Units (TU). (a) For temporary tanks and container storage areas...
20 CFR 655.209 - Invalidation of temporary labor certifications.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Invalidation of temporary labor... LABOR TEMPORARY EMPLOYMENT OF FOREIGN WORKERS IN THE UNITED STATES Labor Certification Process for Logging Employment and Non-H-2A Agricultural Employment § 655.209 Invalidation of temporary labor...
33 CFR 72.01-30 - Temporary deficiencies.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Temporary deficiencies. 72.01-30 Section 72.01-30 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY AIDS TO NAVIGATION MARINE INFORMATION Notices to Mariners § 72.01-30 Temporary deficiencies. Temporary deficiencies...
33 CFR 72.01-30 - Temporary deficiencies.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 33 Navigation and Navigable Waters 1 2011-07-01 2011-07-01 false Temporary deficiencies. 72.01-30 Section 72.01-30 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY AIDS TO NAVIGATION MARINE INFORMATION Notices to Mariners § 72.01-30 Temporary deficiencies. Temporary deficiencies...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-17
... of the Chief Information Officer; Submission for OMB Review; Temporary Contractor Information... information collection requirement regarding temporary contractor information worksheet. A notice was... for temporary contractors as a result of the American Recovery and Reinvestment Act of 2009 (Public...
78 FR 12372 - UBS AG, et al.; Notice of Application and Temporary Order
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-22
... financial planning and wealth management consulting, asset-based and advisory services and transaction-based... Limited (``ESC GP''); UBS Financial Services Inc. (``UBSFS''); UBS Alternative and Quantitative... Switzerland, is a Swiss-based global financial services firm. UBS AG and its subsidiaries provide global...
DOT National Transportation Integrated Search
2009-03-01
INTRODUCTION: Many entities currently use recycled asphalt pavement (RAP) and other aggregates as base material, temporary haul roads, and in hot mix asphalt construction. Several states allow the use of RAP combined with cement for stabilized base c...
Medium-term and long-term outcomes of interventions for primary psoas tendinopathy.
Garala, Kanai; Prasad, Vishnu; Jeyapalan, Kanagaratnam; Power, Richard A
2014-05-01
To assess medium- and long-term outcomes of psoas tendinopathy to psoas tenotomy and image-guided steroid injections. This is a 14-year retrospective case-control study to identify the efficacy of psoas tenotomy and image-guided steroid injections. This study was undertaken in a secondary care setting. Patients with confirmed psoas tendinopathy were followed up by postal questionnaire, which included a nonarthritic hip score (NAHS) and a study patient satisfaction questionnaire. Patients underwent image-guided steroid injections. Depending on the analgesic or symptomatic relief, some patients proceeded to psoas tenotomy. Response to steroid injection. Pain relief and symptomatic relief after the surgery. Twenty-three patients were reviewed with a 70% follow-up over a time of 49 months for surgery (range, 13-144 months) and 77 months for injection (range, 14-160 months). Eight patients had a lasting response to injection and required no further intervention, and 15 patients proceeded to psoas tenotomy using a medial Ludloff approach. The average NAHS scores after the surgery and injection were 66.15 and 76.08, respectively. Ten patients reported pain relief after their tenotomy, and 5 patients reported no change in pain. All 8 patients, who only underwent injection, reported lasting pain relief. Local steroid injections can provide long-term relief for patients presenting with psoas tendinopathy. For those patients with only temporary relief from injection, psoas tenotomy can provide good long-term pain relief.
30 CFR 75.603 - Temporary splice of trailing cable.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Temporary splice of trailing cable. 75.603... SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Trailing Cables § 75.603 Temporary splice of trailing cable. [Statutory Provision] One temporary splice may be made in any trailing cable...
20 CFR 655.172 - Withdrawal of job order and application for temporary employment certification.
Code of Federal Regulations, 2011 CFR
2011-04-01
... temporary employment certification. 655.172 Section 655.172 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR TEMPORARY EMPLOYMENT OF FOREIGN WORKERS IN THE UNITED STATES Labor Certification Process for Temporary Agricultural Employment in the United States (H-2A Workers) Post...
42 CFR 488.835 - Temporary management.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 42 Public Health 5 2013-10-01 2013-10-01 false Temporary management. 488.835 Section 488.835... Sanctions for Home Health Agencies With Deficiencies § 488.835 Temporary management. (a) Application. (1) CMS may impose temporary management of an HHA if it determines that an HHA has a condition-level...
42 CFR 488.835 - Temporary management.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 42 Public Health 5 2014-10-01 2014-10-01 false Temporary management. 488.835 Section 488.835... Sanctions for Home Health Agencies With Deficiencies § 488.835 Temporary management. (a) Application. (1) CMS may impose temporary management of an HHA if it determines that an HHA has a condition-level...
22 CFR 123.5 - Temporary export licenses.
Code of Federal Regulations, 2014 CFR
2014-04-01
... AND TEMPORARY IMPORT OF DEFENSE ARTICLES § 123.5 Temporary export licenses. (a) The Directorate of Defense Trade Controls may issue a license for the temporary export of unclassified defense articles (DSP... Defense Trade Controls if the article is to remain outside the United States beyond the period for which...
30 CFR 47.44 - Temporary, portable containers.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Temporary, portable containers. 47.44 Section... TRAINING HAZARD COMMUNICATION (HazCom) Container Labels and Other Forms of Warning § 47.44 Temporary, portable containers. (a) The operator does not have to label a temporary, portable container if he or she...
46 CFR 112.15-1 - Temporary emergency loads.
Code of Federal Regulations, 2014 CFR
2014-10-01
... AND POWER SYSTEMS Emergency Loads § 112.15-1 Temporary emergency loads. On vessels required by § 112.05-5(a) to have a temporary emergency power source, the following emergency lighting and power loads must be arranged so that they can be energized from the temporary emergency power source: (a...
46 CFR 112.15-1 - Temporary emergency loads.
Code of Federal Regulations, 2012 CFR
2012-10-01
... AND POWER SYSTEMS Emergency Loads § 112.15-1 Temporary emergency loads. On vessels required by § 112.05-5(a) to have a temporary emergency power source, the following emergency lighting and power loads must be arranged so that they can be energized from the temporary emergency power source: (a...
46 CFR 112.15-1 - Temporary emergency loads.
Code of Federal Regulations, 2013 CFR
2013-10-01
... AND POWER SYSTEMS Emergency Loads § 112.15-1 Temporary emergency loads. On vessels required by § 112.05-5(a) to have a temporary emergency power source, the following emergency lighting and power loads must be arranged so that they can be energized from the temporary emergency power source: (a...
Temporary Employment and Perceived Employability: Mediation by Impression Management
ERIC Educational Resources Information Center
De Cuyper, Nele; De Witte, Hans
2010-01-01
Perceived employability (PE) has been advanced as the upcoming resource for career development, particularly for temporary workers. The question is how temporary workers become employable. Our hypothesis is that temporary workers more than permanent workers use impression management to become employable, both on the internal and the external labor…
19 CFR 146.35 - Temporary deposit in a zone; incomplete documentation.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 19 Customs Duties 2 2010-04-01 2010-04-01 false Temporary deposit in a zone; incomplete... SECURITY; DEPARTMENT OF THE TREASURY (CONTINUED) FOREIGN TRADE ZONES Admission of Merchandise to a Zone § 146.35 Temporary deposit in a zone; incomplete documentation. (a) General. Temporary deposit of...
19 CFR 146.35 - Temporary deposit in a zone; incomplete documentation.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 19 Customs Duties 2 2013-04-01 2013-04-01 false Temporary deposit in a zone; incomplete... SECURITY; DEPARTMENT OF THE TREASURY (CONTINUED) FOREIGN TRADE ZONES Admission of Merchandise to a Zone § 146.35 Temporary deposit in a zone; incomplete documentation. (a) General. Temporary deposit of...
19 CFR 146.35 - Temporary deposit in a zone; incomplete documentation.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 19 Customs Duties 2 2012-04-01 2012-04-01 false Temporary deposit in a zone; incomplete... SECURITY; DEPARTMENT OF THE TREASURY (CONTINUED) FOREIGN TRADE ZONES Admission of Merchandise to a Zone § 146.35 Temporary deposit in a zone; incomplete documentation. (a) General. Temporary deposit of...
19 CFR 146.35 - Temporary deposit in a zone; incomplete documentation.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 19 Customs Duties 2 2014-04-01 2014-04-01 false Temporary deposit in a zone; incomplete... SECURITY; DEPARTMENT OF THE TREASURY (CONTINUED) FOREIGN TRADE ZONES Admission of Merchandise to a Zone § 146.35 Temporary deposit in a zone; incomplete documentation. (a) General. Temporary deposit of...
19 CFR 146.35 - Temporary deposit in a zone; incomplete documentation.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 19 Customs Duties 2 2011-04-01 2011-04-01 false Temporary deposit in a zone; incomplete... SECURITY; DEPARTMENT OF THE TREASURY (CONTINUED) FOREIGN TRADE ZONES Admission of Merchandise to a Zone § 146.35 Temporary deposit in a zone; incomplete documentation. (a) General. Temporary deposit of...
36 CFR 13.182 - Temporary facilities.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 36 Parks, Forests, and Public Property 1 2010-07-01 2010-07-01 false Temporary facilities. 13.182... NATIONAL PARK SYSTEM UNITS IN ALASKA Cabins Use of Temporary Facilities Related to Taking Fish and Wildlife § 13.182 Temporary facilities. In a national preserve where the taking of fish and wildlife is...
22 CFR 120.18 - Temporary import.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 22 Foreign Relations 1 2011-04-01 2011-04-01 false Temporary import. 120.18 Section 120.18 Foreign Relations DEPARTMENT OF STATE INTERNATIONAL TRAFFIC IN ARMS REGULATIONS PURPOSE AND DEFINITIONS § 120.18 Temporary import. Temporary import means bringing into the United States from a foreign country any defense...
22 CFR 120.18 - Temporary import.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 22 Foreign Relations 1 2014-04-01 2014-04-01 false Temporary import. 120.18 Section 120.18 Foreign Relations DEPARTMENT OF STATE INTERNATIONAL TRAFFIC IN ARMS REGULATIONS PURPOSE AND DEFINITIONS § 120.18 Temporary import. Temporary import means bringing into the United States from a foreign country any defense...
22 CFR 120.18 - Temporary import.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Temporary import. 120.18 Section 120.18 Foreign Relations DEPARTMENT OF STATE INTERNATIONAL TRAFFIC IN ARMS REGULATIONS PURPOSE AND DEFINITIONS § 120.18 Temporary import. Temporary import means bringing into the United States from a foreign country any defense...
22 CFR 120.18 - Temporary import.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 22 Foreign Relations 1 2012-04-01 2012-04-01 false Temporary import. 120.18 Section 120.18 Foreign Relations DEPARTMENT OF STATE INTERNATIONAL TRAFFIC IN ARMS REGULATIONS PURPOSE AND DEFINITIONS § 120.18 Temporary import. Temporary import means bringing into the United States from a foreign country any defense...
22 CFR 120.18 - Temporary import.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 22 Foreign Relations 1 2013-04-01 2013-04-01 false Temporary import. 120.18 Section 120.18 Foreign Relations DEPARTMENT OF STATE INTERNATIONAL TRAFFIC IN ARMS REGULATIONS PURPOSE AND DEFINITIONS § 120.18 Temporary import. Temporary import means bringing into the United States from a foreign country any defense...
22 CFR 41.31 - Temporary visitors for business or pleasure.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Temporary visitors for business or pleasure. 41.31 Section 41.31 Foreign Relations DEPARTMENT OF STATE VISAS VISAS: DOCUMENTATION OF NONIMMIGRANTS UNDER THE IMMIGRATION AND NATIONALITY ACT, AS AMENDED Temporary Visitors § 41.31 Temporary visitors for...
22 CFR 41.31 - Temporary visitors for business or pleasure.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 22 Foreign Relations 1 2012-04-01 2012-04-01 false Temporary visitors for business or pleasure. 41.31 Section 41.31 Foreign Relations DEPARTMENT OF STATE VISAS VISAS: DOCUMENTATION OF NONIMMIGRANTS UNDER THE IMMIGRATION AND NATIONALITY ACT, AS AMENDED Temporary Visitors § 41.31 Temporary visitors for...
22 CFR 41.31 - Temporary visitors for business or pleasure.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 22 Foreign Relations 1 2011-04-01 2011-04-01 false Temporary visitors for business or pleasure. 41.31 Section 41.31 Foreign Relations DEPARTMENT OF STATE VISAS VISAS: DOCUMENTATION OF NONIMMIGRANTS UNDER THE IMMIGRATION AND NATIONALITY ACT, AS AMENDED Temporary Visitors § 41.31 Temporary visitors for...
22 CFR 41.31 - Temporary visitors for business or pleasure.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 22 Foreign Relations 1 2013-04-01 2013-04-01 false Temporary visitors for business or pleasure. 41.31 Section 41.31 Foreign Relations DEPARTMENT OF STATE VISAS VISAS: DOCUMENTATION OF NONIMMIGRANTS UNDER THE IMMIGRATION AND NATIONALITY ACT, AS AMENDED Temporary Visitors § 41.31 Temporary visitors for...
22 CFR 41.31 - Temporary visitors for business or pleasure.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 22 Foreign Relations 1 2014-04-01 2014-04-01 false Temporary visitors for business or pleasure. 41.31 Section 41.31 Foreign Relations DEPARTMENT OF STATE VISAS VISAS: DOCUMENTATION OF NONIMMIGRANTS UNDER THE IMMIGRATION AND NATIONALITY ACT, AS AMENDED Temporary Visitors § 41.31 Temporary visitors for...
33 CFR 174.29 - Temporary certificate of number.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 33 Navigation and Navigable Waters 2 2012-07-01 2012-07-01 false Temporary certificate of number. 174.29 Section 174.29 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY....29 Temporary certificate of number. A State may issue a temporary certificate of number that is...
33 CFR 174.29 - Temporary certificate of number.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 33 Navigation and Navigable Waters 2 2014-07-01 2014-07-01 false Temporary certificate of number. 174.29 Section 174.29 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY....29 Temporary certificate of number. A State may issue a temporary certificate of number that is...
5 CFR 300.503 - Conditions for using private sector temporaries.
Code of Federal Regulations, 2010 CFR
2010-01-01
... temporaries. 300.503 Section 300.503 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE... help service firm for the brief or intermittent use of the skills of private sector temporaries, when... through the direct appointment of temporary employees within the time available by the date, and for the...
8 CFR 1244.14 - Withdrawal of Temporary Protected Status.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 8 Aliens and Nationality 1 2013-01-01 2013-01-01 false Withdrawal of Temporary Protected Status... JUSTICE IMMIGRATION REGULATIONS TEMPORARY PROTECTED STATUS FOR NATIONALS OF DESIGNATED STATES § 1244.14 Withdrawal of Temporary Protected Status. (a) Authority of director. The director may withdraw the status of...
8 CFR 1244.14 - Withdrawal of Temporary Protected Status.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 8 Aliens and Nationality 1 2012-01-01 2012-01-01 false Withdrawal of Temporary Protected Status... JUSTICE IMMIGRATION REGULATIONS TEMPORARY PROTECTED STATUS FOR NATIONALS OF DESIGNATED STATES § 1244.14 Withdrawal of Temporary Protected Status. (a) Authority of director. The director may withdraw the status of...
8 CFR 1244.14 - Withdrawal of Temporary Protected Status.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 8 Aliens and Nationality 1 2010-01-01 2010-01-01 false Withdrawal of Temporary Protected Status... JUSTICE IMMIGRATION REGULATIONS TEMPORARY PROTECTED STATUS FOR NATIONALS OF DESIGNATED STATES § 1244.14 Withdrawal of Temporary Protected Status. (a) Authority of director. The director may withdraw the status of...
8 CFR 1244.14 - Withdrawal of Temporary Protected Status.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 8 Aliens and Nationality 1 2014-01-01 2014-01-01 false Withdrawal of Temporary Protected Status... JUSTICE IMMIGRATION REGULATIONS TEMPORARY PROTECTED STATUS FOR NATIONALS OF DESIGNATED STATES § 1244.14 Withdrawal of Temporary Protected Status. (a) Authority of director. The director may withdraw the status of...
8 CFR 1244.14 - Withdrawal of Temporary Protected Status.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 8 Aliens and Nationality 1 2011-01-01 2011-01-01 false Withdrawal of Temporary Protected Status... JUSTICE IMMIGRATION REGULATIONS TEMPORARY PROTECTED STATUS FOR NATIONALS OF DESIGNATED STATES § 1244.14 Withdrawal of Temporary Protected Status. (a) Authority of director. The director may withdraw the status of...
47 CFR 63.22 - Facilities-based international common carriers.
Code of Federal Regulations, 2013 CFR
2013-10-01
... through post facto remedies, the International Bureau may impose temporary requirements on carriers.... 63.22 Section 63.22 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER... Supplements § 63.22 Facilities-based international common carriers. The following conditions apply to...
47 CFR 63.22 - Facilities-based international common carriers.
Code of Federal Regulations, 2014 CFR
2014-10-01
... through post facto remedies, the International Bureau may impose temporary requirements on carriers.... 63.22 Section 63.22 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER... Supplements § 63.22 Facilities-based international common carriers. The following conditions apply to...
Large capacity temporary visual memory.
Endress, Ansgar D; Potter, Mary C
2014-04-01
Visual working memory (WM) capacity is thought to be limited to 3 or 4 items. However, many cognitive activities seem to require larger temporary memory stores. Here, we provide evidence for a temporary memory store with much larger capacity than past WM capacity estimates. Further, based on previous WM research, we show that a single factor--proactive interference--is sufficient to bring capacity estimates down to the range of previous WM capacity estimates. Participants saw a rapid serial visual presentation of 5-21 pictures of familiar objects or words presented at rates of 4/s or 8/s, respectively, and thus too fast for strategies such as rehearsal. Recognition memory was tested with a single probe item. When new items were used on all trials, no fixed memory capacities were observed, with estimates of up to 9.1 retained pictures for 21-item lists, and up to 30.0 retained pictures for 100-item lists, and no clear upper bound to how many items could be retained. Further, memory items were not stored in a temporally stable form of memory but decayed almost completely after a few minutes. In contrast, when, as in most WM experiments, a small set of items was reused across all trials, thus creating proactive interference among items, capacity remained in the range reported in previous WM experiments. These results show that humans have a large-capacity temporary memory store in the absence of proactive interference, and raise the question of whether temporary memory in everyday cognitive processing is severely limited, as in WM experiments, or has the much larger capacity found in the present experiments.
Temporary Inferior Vena Cava Filters: How Do We Move Forward?
Arous, Edward J; Messina, Louis M
2016-05-01
Despite their widespread use, the indications for the selective use of temporary inferior vena cava (IVC) filters remains uncertain with few trials supporting their use. Additionally, the risks of long-term temporary IVC filter insertion are being increasingly discussed amongst the mainstream media and through multiple class action lawsuits. Retrievable IVC filters were specifically designed to have a less secure implantation in order to facilitate retrieval. However, multiple reports have demonstrated significant filter-related complications, most commonly related to duration of implantation. Furthermore, the risk is not isolated to one manufacturer alone. The incidence of filter-related complications is linearly related to its duration of time on the market. Currently, the FDA recommends that IVC filters be removed within 25-54 days of their implantation. Unfortunately, little evidence exists to show that this recommendation is followed routinely. Recently, the PRESERVE Trial (NCT02381509) was initiated as a multicenter non-randomized open label study to determine the safety and effectiveness of commercially available IVC filters (both temporary and permanent) in individuals who require mechanical prophylaxis against pulmonary embolism. Until such evidence is developed, temporary IVC filters should be implanted based on best available evidence and routinely removed within the guidelines of the FDA of 25-54 days. A fair question at this point is whether the design features themselves that are required to manufacture a low profile removable IVC filter can achieve effective prophylaxis against pulmonary embolism at a low rate of short and long-term complications. Copyright © 2016 American College of Chest Physicians. Published by Elsevier Inc. All rights reserved.
Traction test of temporary dental cements.
Román-Rodríguez, Juan-Luis; Millan-Martínez, Diego; Fons-Font, Antonio; Agustín-Panadero, Rubén; Fernández-Estevan, Lucía
2017-04-01
Classic self-curing temporary cements obstruct the translucence of provisional restorations. New dual-cure esthetic temporary cements need investigation and comparison with classic cements to ensure that they are equally retentive and provide adequate translucence. The objective is to analyze by means of traction testing in a in vitro study the retention of five temporary cements. Ten molars were prepared and ten provisional resin restorations were fabricated using CAD-CAM technology (n=10). Five temporary cements were selected: self-curing temporary cements, Dycal (D), Temp Bond (TB), Temp Bond Non Eugenol (TBNE); dual-curing esthetic cements Temp Bond Clear (TBC) and Telio CS link (TE). Each sample underwent traction testing, both with thermocycling (190 cycles at 5-55º) and without thermocycling. TE and TBC obtained the highest traction resistance values. Thermocycling reduced the resistance of all cements except TBC. The dual-cure esthetic cements tested provided optimum outcomes for bonding provisional restorations. Key words: Temporary dental cements, cements resistance.
21 CFR 872.3770 - Temporary crown and bridge resin.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 21 Food and Drugs 8 2011-04-01 2011-04-01 false Temporary crown and bridge resin. 872.3770 Section... (CONTINUED) MEDICAL DEVICES DENTAL DEVICES Prosthetic Devices § 872.3770 Temporary crown and bridge resin. (a) Identification. A temporary crown and bridge resin is a device composed of a material, such as...
Code of Federal Regulations, 2011 CFR
2011-01-01
... owned permanent and temporary import quarantine facilities. 130.5 Section 130.5 Animals and Animal... User fees for services at privately owned permanent and temporary import quarantine facilities. (a... privately operated permanent or temporary import quarantine facility will be calculated at the hourly user...
Code of Federal Regulations, 2013 CFR
2013-01-01
... owned permanent and temporary import quarantine facilities. 130.5 Section 130.5 Animals and Animal... User fees for services at privately owned permanent and temporary import quarantine facilities. (a... privately operated permanent or temporary import quarantine facility will be calculated at the hourly user...
Code of Federal Regulations, 2012 CFR
2012-01-01
... owned permanent and temporary import quarantine facilities. 130.5 Section 130.5 Animals and Animal... User fees for services at privately owned permanent and temporary import quarantine facilities. (a... privately operated permanent or temporary import quarantine facility will be calculated at the hourly user...
Code of Federal Regulations, 2014 CFR
2014-01-01
... owned permanent and temporary import quarantine facilities. 130.5 Section 130.5 Animals and Animal... User fees for services at privately owned permanent and temporary import quarantine facilities. (a... privately operated permanent or temporary import quarantine facility will be calculated at the hourly user...
Code of Federal Regulations, 2010 CFR
2010-01-01
... owned permanent and temporary import quarantine facilities. 130.5 Section 130.5 Animals and Animal... User fees for services at privately owned permanent and temporary import quarantine facilities. (a... privately operated permanent or temporary import quarantine facility will be calculated at the hourly user...
30 CFR 77.601 - Trailing cables or portable cables; temporary splices.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Trailing cables or portable cables; temporary... OF UNDERGROUND COAL MINES Trailing Cables § 77.601 Trailing cables or portable cables; temporary splices. Temporary splices in trailing cables or portable cables shall be made in a workmanlike manner and...
19 CFR 122.188 - Issuance of temporary Customs access seal.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 19 Customs Duties 1 2010-04-01 2010-04-01 false Issuance of temporary Customs access seal. 122.188... temporary Customs access seal. (a) Conditions for issuance. When an approved Customs access seal is required... temporary Customs access seal for his employee. The employer must satisfy the port director that a hardship...
19 CFR 122.188 - Issuance of temporary Customs access seal.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 19 Customs Duties 1 2011-04-01 2011-04-01 false Issuance of temporary Customs access seal. 122.188... temporary Customs access seal. (a) Conditions for issuance. When an approved Customs access seal is required... temporary Customs access seal for his employee. The employer must satisfy the port director that a hardship...
25 CFR 11.607 - Temporary orders and temporary injunctions.
Code of Federal Regulations, 2012 CFR
2012-04-01
...) In a proceeding for dissolution of marriage or for legal separation, either party may move for temporary maintenance or temporary support of a child of the marriage entitled to support. The motion shall... the peace of the other party or of any child; (3) Excluding a party from the family home or from the...
25 CFR 11.607 - Temporary orders and temporary injunctions.
Code of Federal Regulations, 2014 CFR
2014-04-01
...) In a proceeding for dissolution of marriage or for legal separation, either party may move for temporary maintenance or temporary support of a child of the marriage entitled to support. The motion shall... the peace of the other party or of any child; (3) Excluding a party from the family home or from the...
25 CFR 11.607 - Temporary orders and temporary injunctions.
Code of Federal Regulations, 2013 CFR
2013-04-01
...) In a proceeding for dissolution of marriage or for legal separation, either party may move for temporary maintenance or temporary support of a child of the marriage entitled to support. The motion shall... the peace of the other party or of any child; (3) Excluding a party from the family home or from the...
25 CFR 11.607 - Temporary orders and temporary injunctions.
Code of Federal Regulations, 2011 CFR
2011-04-01
...) In a proceeding for dissolution of marriage or for legal separation, either party may move for temporary maintenance or temporary support of a child of the marriage entitled to support. The motion shall... the peace of the other party or of any child; (3) Excluding a party from the family home or from the...
33 CFR 74.01-15 - Charges for placement of temporary aids.
Code of Federal Regulations, 2011 CFR
2011-07-01
... temporary aids. 74.01-15 Section 74.01-15 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY AIDS TO NAVIGATION CHARGES FOR COAST GUARD AIDS TO NAVIGATION WORK Charges to the Public § 74.01-15 Charges for placement of temporary aids. Charges for placement of temporary aids will be...
33 CFR 74.01-15 - Charges for placement of temporary aids.
Code of Federal Regulations, 2012 CFR
2012-07-01
... temporary aids. 74.01-15 Section 74.01-15 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY AIDS TO NAVIGATION CHARGES FOR COAST GUARD AIDS TO NAVIGATION WORK Charges to the Public § 74.01-15 Charges for placement of temporary aids. Charges for placement of temporary aids will be...
33 CFR 74.01-15 - Charges for placement of temporary aids.
Code of Federal Regulations, 2014 CFR
2014-07-01
... temporary aids. 74.01-15 Section 74.01-15 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY AIDS TO NAVIGATION CHARGES FOR COAST GUARD AIDS TO NAVIGATION WORK Charges to the Public § 74.01-15 Charges for placement of temporary aids. Charges for placement of temporary aids will be...
33 CFR 74.01-15 - Charges for placement of temporary aids.
Code of Federal Regulations, 2013 CFR
2013-07-01
... temporary aids. 74.01-15 Section 74.01-15 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY AIDS TO NAVIGATION CHARGES FOR COAST GUARD AIDS TO NAVIGATION WORK Charges to the Public § 74.01-15 Charges for placement of temporary aids. Charges for placement of temporary aids will be...
33 CFR 74.01-15 - Charges for placement of temporary aids.
Code of Federal Regulations, 2010 CFR
2010-07-01
... temporary aids. 74.01-15 Section 74.01-15 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY AIDS TO NAVIGATION CHARGES FOR COAST GUARD AIDS TO NAVIGATION WORK Charges to the Public § 74.01-15 Charges for placement of temporary aids. Charges for placement of temporary aids will be...
Temporary Work and Insecurity in Britain: A Problem Solved?
ERIC Educational Resources Information Center
Green, Francis
2008-01-01
Temporary workers in Britain experience lower job quality. However, the proportion of employees on temporary contracts has fallen since a decade ago to just 5.5% in 2005. There have also been qualitative improvements. Many temporary workers now fall under the protection of the Fixed Term Employees' (Prevention of Less Favourable Treatment)…
21 CFR 872.3770 - Temporary crown and bridge resin.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Temporary crown and bridge resin. 872.3770 Section... (CONTINUED) MEDICAL DEVICES DENTAL DEVICES Prosthetic Devices § 872.3770 Temporary crown and bridge resin. (a) Identification. A temporary crown and bridge resin is a device composed of a material, such as...
8 CFR 244.14 - Withdrawal of Temporary Protected Status.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 8 Aliens and Nationality 1 2010-01-01 2010-01-01 false Withdrawal of Temporary Protected Status... TEMPORARY PROTECTED STATUS FOR NATIONALS OF DESIGNATED STATES § 244.14 Withdrawal of Temporary Protected... Protected Status under section 244 of the Act at any time upon the occurrence of any of the following: (1...
8 CFR 244.14 - Withdrawal of Temporary Protected Status.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 8 Aliens and Nationality 1 2011-01-01 2011-01-01 false Withdrawal of Temporary Protected Status... TEMPORARY PROTECTED STATUS FOR NATIONALS OF DESIGNATED STATES § 244.14 Withdrawal of Temporary Protected... Protected Status under section 244 of the Act at any time upon the occurrence of any of the following: (1...
Creative Arts Therapies as Temporary Home for Refugees: Insights from Literature and Practice
Dieterich-Hartwell, Rebekka; Koch, Sabine C.
2017-01-01
One of the frequently overlooked psychosocial problems of refugees is the phenomenon of homesickness. Being forced into exile and unable to return home may cause natural feelings of nostalgia but may also result in emotional, cognitive, behavioral and physical adversities. According to the literature, the creative arts therapies with their attention to preverbal language—music, imagery, dance, role play, and movement—are able to reach individuals through the senses and promote successive integration, which can lead to transformation and therapeutic change. These forms of therapy can be a temporary home for refugees in the acculturation process, by serving as a safe and enactive transitional space. More specifically, working with dance and movement can foster the experience of the body as a home and thus provide a safe starting place, from which to regulate arousal, increase interoception, and symbolize trauma- and resource-related processes. Hearing, playing, and singing music from the home culture may assist individuals in maintaining their cultural and personal individuality. Creating drawings, paintings, or sculpturing around the topics of houses and environments from the past can help refugees to retain their identity through art, creating safe spaces for the future helps to look ahead, retain resources, and regain control. This article provides a literature review related to home and homesickness, and the role the arts therapies can play for refugees in transition. It further reports selected interview data on adverse life events and burdens in the host country from a German study. We propose that the creative arts therapies are not only a container that offers a temporary home, but can also serve as a bridge that gently guides refugees to a stepwise integration in the host country. Several clinical and research examples are presented suggesting that the support and affirmation through the creative arts can strengthen individuals in their process of moving from an old to a new environment. PMID:29039756
NASA Astrophysics Data System (ADS)
Lavrinov, V. V.; Lavrinova, L. N.
2017-11-01
The statistically optimal control algorithm for the correcting mirror is formed by constructing a prediction of distortions of the optical signal and improves the time resolution of the adaptive optics system. The prediction of distortions is based on an analysis of the dynamics of changes in the optical inhomogeneities of the turbulent atmosphere or the evolution of phase fluctuations at the input aperture of the adaptive system. Dynamic properties of the system are manifested during the temporary transformation of the stresses controlling the mirror and are determined by the dynamic characteristics of the flexible mirror.
Biodegradable Magnesium Alloys: A Review of Material Development and Applications
Persaud-Sharma, Dharam; McGoron, Anthony
2012-01-01
Magnesium based alloys possess a natural ability to biodegrade due to corrosion when placed within aqueous substances, which is promising for cardiovascular and orthopedic medical device applications. These materials can serve as a temporary scaffold when placed in vivo, which is desirable for treatments when temporary supportive structures are required to assist in the wound healing process. The nature of these materials to degrade is attributed to the high oxidative corrosion rates of magnesium. In this review, a summary is presented for magnesium material development, biocorrosion characteristics, as well as a biological translation for these results. PMID:22408600
Kocher, Gregor J; Poulson, Jannie Lysgaard; Blichfeldt-Eckhardt, Morten Rune; Elle, Bo; Schmid, Ralph A; Licht, Peter B
2016-04-01
The importance of phrenic nerve preservation during pneumonectomy remains controversial. We previously demonstrated that preservation of the phrenic nerve in the immediate postoperative period preserved lung function by 3-5% but little is known about its long-term effects. We, therefore, decided to investigate the effect of temporary ipsilateral cervical phrenic nerve block on dynamic lung volumes in mid- to long-term pneumonectomy patients. We investigated 14 patients after a median of 9 years post pneumonectomy (range: 1-15 years). Lung function testing (spirometry) and fluoroscopic and/or sonographic assessment of diaphragmatic motion on the pneumonectomy side were performed before and after ultrasonographic-guided ipsilateral cervical phrenic nerve block by infiltration with lidocaine. Ipsilateral phrenic nerve block was successfully achieved in 12 patients (86%). In the remaining 2 patients, diaphragmatic motion was already paradoxical before the nerve block. We found no significant difference on dynamic lung function values (FEV1 'before' 1.39 ± 0.44 vs FEV1 'after' 1.38 ± 0.40; P = 0.81). Induction of a temporary diaphragmatic palsy did not significantly influence dynamic lung volumes in mid- to long-term pneumonectomy patients, suggesting that preservation of the phrenic nerve is of greater importance in the immediate postoperative period after pneumonectomy. © The Author 2015. Published by Oxford University Press on behalf of the European Association for Cardio-Thoracic Surgery. All rights reserved.
Temporary Contracts: Effect on Job Satisfaction and Personal Lives of Recent Phd Graduates
ERIC Educational Resources Information Center
Waaijer, Cathelijn J. F.; Belder, Rosalie; Sonneveld, Hans; van Bochove, Cornelis A.; van der Weijden, Inge C. M.
2017-01-01
In this study, we assess the effects of temporary employment on job satisfaction and the personal lives of recent PhD graduates. Temporary employment is becoming increasingly prevalent in many sectors, but has been relatively common in academia, especially for early career scientists. Labor market theory shows temporary employment to have a…
Code of Federal Regulations, 2011 CFR
2011-07-01
... bacteriophages; temporary exemption from the requirement of a tolerance. 180.1301 Section 180.1301 Protection of... bacteriophages; temporary exemption from the requirement of a tolerance. A temporary exemption from the requirement of a tolerance is established for residues of lytic bacteriophages that are specific to...
Code of Federal Regulations, 2014 CFR
2014-07-01
... bacteriophages; temporary exemption from the requirement of a tolerance. 180.1301 Section 180.1301 Protection of... bacteriophages; temporary exemption from the requirement of a tolerance. A temporary exemption from the requirement of a tolerance is established for residues of lytic bacteriophages that are specific to...
Code of Federal Regulations, 2013 CFR
2013-07-01
... bacteriophages; temporary exemption from the requirement of a tolerance. 180.1301 Section 180.1301 Protection of... bacteriophages; temporary exemption from the requirement of a tolerance. A temporary exemption from the requirement of a tolerance is established for residues of lytic bacteriophages that are specific to...
Code of Federal Regulations, 2012 CFR
2012-07-01
... bacteriophages; temporary exemption from the requirement of a tolerance. 180.1301 Section 180.1301 Protection of... bacteriophages; temporary exemption from the requirement of a tolerance. A temporary exemption from the requirement of a tolerance is established for residues of lytic bacteriophages that are specific to...
The Temporary Help Industry: A Response to the Dual Internal Labor Market.
ERIC Educational Resources Information Center
Mangum, Garth; And Others
1985-01-01
This study of the rapidly growing temporary help industry draws on Commerce Department data and the results of the authors' national mail survey of employers. The authors also conducted interviews in the San Francisco area with employers of temporary help and with representatives of temporary help agencies and labor unions. (Author/CT)
46 CFR 112.15-10 - Loads on systems without a temporary emergency power source.
Code of Federal Regulations, 2013 CFR
2013-10-01
...) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Loads § 112.15-10 Loads on systems without a temporary emergency power source. If there is no temporary emergency power source, the loads... 46 Shipping 4 2013-10-01 2013-10-01 false Loads on systems without a temporary emergency power...
46 CFR 112.15-10 - Loads on systems without a temporary emergency power source.
Code of Federal Regulations, 2014 CFR
2014-10-01
...) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Loads § 112.15-10 Loads on systems without a temporary emergency power source. If there is no temporary emergency power source, the loads... 46 Shipping 4 2014-10-01 2014-10-01 false Loads on systems without a temporary emergency power...
46 CFR 112.15-10 - Loads on systems without a temporary emergency power source.
Code of Federal Regulations, 2012 CFR
2012-10-01
...) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Loads § 112.15-10 Loads on systems without a temporary emergency power source. If there is no temporary emergency power source, the loads... 46 Shipping 4 2012-10-01 2012-10-01 false Loads on systems without a temporary emergency power...
46 CFR 112.15-10 - Loads on systems without a temporary emergency power source.
Code of Federal Regulations, 2011 CFR
2011-10-01
...) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Loads § 112.15-10 Loads on systems without a temporary emergency power source. If there is no temporary emergency power source, the loads... 46 Shipping 4 2011-10-01 2011-10-01 false Loads on systems without a temporary emergency power...
46 CFR 112.15-10 - Loads on systems without a temporary emergency power source.
Code of Federal Regulations, 2010 CFR
2010-10-01
...) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Loads § 112.15-10 Loads on systems without a temporary emergency power source. If there is no temporary emergency power source, the loads... 46 Shipping 4 2010-10-01 2010-10-01 false Loads on systems without a temporary emergency power...
27 CFR 6.85 - Temporary retailers.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 27 Alcohol, Tobacco Products and Firearms 1 2010-04-01 2010-04-01 false Temporary retailers. 6.85 Section 6.85 Alcohol, Tobacco Products and Firearms ALCOHOL AND TOBACCO TAX AND TRADE BUREAU, DEPARTMENT OF THE TREASURY LIQUORS âTIED-HOUSEâ Exceptions § 6.85 Temporary retailers. (a) General. The furnishing of things of value to a temporary...
27 CFR 6.85 - Temporary retailers.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 27 Alcohol, Tobacco Products and Firearms 1 2011-04-01 2011-04-01 false Temporary retailers. 6.85 Section 6.85 Alcohol, Tobacco Products and Firearms ALCOHOL AND TOBACCO TAX AND TRADE BUREAU, DEPARTMENT OF THE TREASURY LIQUORS âTIED-HOUSEâ Exceptions § 6.85 Temporary retailers. (a) General. The furnishing of things of value to a temporary...
Code of Federal Regulations, 2010 CFR
2010-04-01
... of initial decision making a temporary order permanent. 201.540 Section 201.540 Commodity and... Temporary Orders and Suspensions § 201.540 Appeal and Commission review of initial decision making a... decision as to whether a temporary sanction shall be made permanent shall file a petition for review...
[The morbidity of population temporary disability in the Russian Federation].
Shchepin, V O
2012-01-01
The article presents the results of calculation and analysis of structure and rate of temporary disability morbidity in the Russian Federation in 2007-2010. The quality assessment of the indicators of temporary disability morbidity is given. The financial volumes of work losses and costs of medical care and disease social insurance are established. The significant gender differences in rate and temporary disability duration are demonstrated. The issues demanding a specific approach during the development of activities targeted to prevention and decrease of temporary disability morbidity are discussed.
Castillo-de-Oyagüe, Raquel; Sánchez-Turrión, Andrés; López-Lozano, José-Francisco; Albaladejo, Alberto; Torres-Lagares, Daniel; Montero, Javier; Suárez-García, Maria-Jesús
2012-07-01
This study aimed to evaluate the vertical discrepancy of implant-supported crown structures constructed with vacuum-casting and Direct Metal Laser Sintering (DMLS) technologies, and luted with different cement types. Crown copings were fabricated using: (1) direct metal laser sintered Co-Cr (LS); (2) vacuum-cast Co-Cr (CC); and (3) vacuum-cast Ti (CT). Frameworks were luted onto machined implant abutments under constant seating pressure. Each alloy group was randomly divided into 5 subgroups (n = 10 each) according to the cement system utilized: Subgroup 1 (KC) used resin-modified glass-ionomer Ketac Cem Plus; Subgroup 2 (PF) used Panavia F 2.0 dual-cure resin cement; Subgroup 3 (RXU) used RelyX Unicem 2 Automix self-adhesive dual-cure resin cement; Subgroup 4 (PIC) used acrylic/urethane-based temporary Premier Implant Cement; and Subgroup 5 (DT) used acrylic/urethane-based temporary DentoTemp cement. Vertical misfit was measured by scanning electron microscopy (SEM). Two-way ANOVA and Student-Newman-Keuls tests were run to investigate the effect of alloy/fabrication technique, and cement type on vertical misfit. The statistical significance was set at α = 0.05. The alloy/manufacturing technique and the luting cement affected the vertical discrepancy (p < 0.001). For each cement type, LS samples exhibited the best fit (p < 0.01) whereas CC and CT frames were statistically similar. Within each alloy group, PF and RXU provided comparably greater discrepancies than KC, PIC, and DT, which showed no differences. Laser sintering may be an alternative to vacuum-casting of base metals to obtain passive-fitting implant-supported crown copings. The best marginal adaptation corresponded to laser sintered structures luted with glass-ionomer KC, or temporary PIC or DT cements. The highest discrepancies were recorded for Co-Cr and Ti cast frameworks bonded with PF or RXU resinous agents. All groups were within the clinically acceptable misfit range.
Code of Federal Regulations, 2010 CFR
2010-07-01
... CONTRACTUAL OBLIGATIONS FOR TEMPORARY ALIEN AGRICULTURAL WORKERS ADMITTED UNDER SECTION 218 OF THE IMMIGRATION... the Administrator, WHD after notice and an opportunity for hearing when it is shown based on objective...
Ostman, Pär-Olov; Hellman, Mats; Sennerby, Lars; Wennerberg, Ann
2008-05-01
During the last years, focus has been paid to implant treatment using immediate function protocols, and different approaches to provide patients with temporary constructions have been presented. Most of these techniques involve dental technicians producing the temporary construction, for example, rebuilding existing dentures, acrylic bridges, etc. The purpose of this prospective clinical study was to evaluate the clinical outcome of a chair-side technique of a cost-effective temporary prosthesis. Fixture survival rate and risk of temporary bridge failure were analyzed. Thirty-seven partially or totally edentate patients (18 female and 19 male; mean age: 66.7 years) treated with chair-side manufactured temporary restorations (QuickBridge, BIOMET 3i, Palm Beach, Fl, USA) for immediate loading have been evaluated. The prostheses extended from two unit bridges supported by two implants to full-arch construction supported by six implants. The temporary prostheses were monitored from the day of surgery and delivery to the time of replacement with a permanent prosthetic construction 3 to 6 months later. No implants were lost during the observation time. One (3%) temporary prosthesis fractured and additional two (6%) loosened during the follow-up time. The study indicated that the tested chair-side concept for manufacturing of temporary prosthesis for immediate loading of dental implants is a viable approach.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-28
...-0086] Group Lotus plc; Modification of a Temporary Exemption From an Advanced Air Bag Requirement of... temporary exemption granted to Group Lotus plc (Lotus) on March 8, 2013. The agency granted Lotus an... Lotus Plc (Lotus) a temporary exemption from the higher maximum speed (56 km/h (35 mph)) belted test...
Code of Federal Regulations, 2010 CFR
2010-04-01
... Act of 1984 (temporary). (a) Introduction—(1) Scope. This section prescribes temporary question and... the person to whom the payment is to be made properly uses the completed contract method of accounting... amount is owed to a related person under whose method of accounting such amount is not includible in...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-02
... the Temporary Employment of Aliens in Agriculture in the United States; Announcement of Non- Material... reasons in great detail in the preamble of the ``Temporary Agricultural Employment of H-2A Aliens in the... set the AEWR. See ``Temporary Agricultural Employment of H-2A Aliens in the United States; Modernizing...
41 CFR 302-3.400 - What is a “temporary change of station (TCS)”?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 4 2010-07-01 2010-07-01 false What is a âtemporary change of station (TCS)â? 302-3.400 Section 302-3.400 Public Contracts and Property Management Federal... TYPE Employee's Temporary Change Of Station § 302-3.400 What is a “temporary change of station (TCS...
26 CFR 1.181-0T - Table of contents (temporary).
Code of Federal Regulations, 2010 CFR
2010-04-01
... 26 Internal Revenue 3 2010-04-01 2010-04-01 false Table of contents (temporary). 1.181-0T Section...-0T Table of contents (temporary). This section lists the table of contents for §§ 1.181-1T through 1... deduction allowed. § 1.181-2TElection (temporary). (a) Time and manner of making election. (b) Election by...
Code of Federal Regulations, 2010 CFR
2010-04-01
... even though he or she holds a temporary, part-time, probationary, or seasonal employment position? 1002... employee have rights under USERRA even though he or she holds a temporary, part-time, probationary, or seasonal employment position? USERRA rights are not diminished because an employee holds a temporary, part...
41 CFR 302-3.400 - What is a “temporary change of station (TCS)”?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 41 Public Contracts and Property Management 4 2011-07-01 2011-07-01 false What is a âtemporary change of station (TCS)â? 302-3.400 Section 302-3.400 Public Contracts and Property Management Federal... TYPE Employee's Temporary Change Of Station § 302-3.400 What is a “temporary change of station (TCS...
Traction test of temporary dental cements
Millan-Martínez, Diego; Fons-Font, Antonio; Agustín-Panadero, Rubén; Fernández-Estevan, Lucía
2017-01-01
Background Classic self-curing temporary cements obstruct the translucence of provisional restorations. New dual-cure esthetic temporary cements need investigation and comparison with classic cements to ensure that they are equally retentive and provide adequate translucence. The objective is to analyze by means of traction testing in a in vitro study the retention of five temporary cements. Material and Methods Ten molars were prepared and ten provisional resin restorations were fabricated using CAD-CAM technology (n=10). Five temporary cements were selected: self-curing temporary cements, Dycal (D), Temp Bond (TB), Temp Bond Non Eugenol (TBNE); dual-curing esthetic cements Temp Bond Clear (TBC) and Telio CS link (TE). Each sample underwent traction testing, both with thermocycling (190 cycles at 5-55º) and without thermocycling. Results TE and TBC obtained the highest traction resistance values. Thermocycling reduced the resistance of all cements except TBC. Conclusions The dual-cure esthetic cements tested provided optimum outcomes for bonding provisional restorations. Key words:Temporary dental cements, cements resistance. PMID:28469824
Gender, migration, risky sex, and HIV infection in China.
Yang, Xiushi; Xia, Guomei
2006-12-01
Gender differences in sexual behavior as a consequence of migration have been ignored in both the migration and the HIV literature in China. This study examines differences among temporary migrants in terms of sexual behavior and factors that make female migrants more vulnerable to the risk of acquiring HIV infection. Results suggest that the interplay of migration and gender renders female temporary migrants particularly vulnerable to engaging in casual and commercial sex. Although male temporary migrants do not differ from male nonmigrants in prevalence of casual and commercial sex, the prevalence rates of casual and commercial sex for female temporary migrants are found to be 14 and 80 times those for female nonmigrants, respectively. Female temporary migrants' higher unemployment rate and concentration in the service and entertainment sectors are keys to understanding differences in the prevalence of casual and commercial sex among temporary migrants according to sex. Policy measures to promote female temporary migrants' equal access to employment are urgently needed to improve their economic well-being and to reduce their risky sexual behavior.
Use of titanium mesh for reconstruction of large anterior cranial base defects.
Badie, B; Preston, J K; Hartig, G K
2000-10-01
The authors evaluated the role of titanium mesh used in combination with vascularized pericranium to provide rigid support during reconstruction of anterior skull base defects. Thirteen patients with large anterior skull base defects caused by tumor invasion or traumatic injury involving the cribriform plate, orbital roof, and planum sphenoidale were included in the study. The reconstruction technique involved placement of titanium mesh between two layers of continuous vascularized pericranium. Surgical glue and routine lumbar cerebrospinal fluid (CSF) drainage were not used in any patient. At a mean postoperative follow-up time of 22 months (range 8-39 months), none of the patients had developed infection or meningocele. Postoperative CSF rhinorrhea occurred in two patients with extensive dural defects, which resolved with temporary lumbar drainage. Use of titanium mesh and a two-layer vascularized pericranial graft is a safe, reproducible, and feasible method for reconstructing the anterior skull base. Patients with large dural defects may need temporary CSF diversion to avoid postoperative fistula formation.
Predictors of sustained organizational commitment among nurses with temporary job contracts.
Jalonen, Paivi; Virtanen, Marianna; Vahtera, Jussi; Elovainio, Marko; Kivimaki, Mika
2006-05-01
To examine sociodemographic, work-related factors and psychological health as predictors of sustained organizational commitment among temporary hospital employees. The participants were 412 nurses who had a temporary job contract and reported being committed to their organization at baseline. Organizational commitment was measured again 2 years later. The results of logistic regression analysis showed that age over 35 years, high job control, high participative safety, high perceived justice in decision making, and low psychological distress predicted sustained organizational commitment at follow-up. The change from temporary employment to a permanent job and high job control predicted sustained organizational commitment even after the effect of all the other predictors was taken into account. Organizations that employ temporary workers should pay attention to the job control and career prospects of temporary staff.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-08
...-fraud provisions, as well as exempt these security-based swaps from Exchange Act registration... interest involving security-based swaps.\\31\\ We have also proposed anti-fraud and anti-manipulation rules... Against Fraud, Manipulation, and Deception in Connection with Security-Based Swaps, Release No. 34-63236...
Franco-Ramírez, Julieta A; Cabrera-Pivaral, Carlos E; Zárate-Guerrero, Gabriel; Franco-Chávez, Sergio A; Covarrubias-Bermúdez, María Á; Zavala-González, Marco A
2018-01-01
Puerperal care and feeding of the newborn are guided by entrenched cultural meanings between women, so it is important to know and identify how they are acquired and perpetuated. Regarding this knowledge, the social representations that Mexican pregnant teenagers have about puerperium, lactation and newborn care were studied. An interpretative study was made based on principles of the theory of social representations. Interviews were conducted to obtain information from 30 Mexican adolescents who attended prenatal care at the gynecological obstetrics area in a second-level hospital during 2015. Classical content analysis strategies were applied to analyze the information; this process consisted of coding and categorizing information. A conceptual map was also developed to describe the social representations found. In this study, 190 codes and three social representations were identified: "breastfeeding is a practice based on myths", "newborns are fragile" and "mother and child must be synchronized". Three social representations were identified that explain the practices of adolescents towards breastfeeding and the care of them and their children, which were acquired through family communication and strengthened by the need for support due to the temporary or permanent absence of the couple, personal crises motivated by bodily changes, fear of new modifications due to breastfeeding and ignorance about how carry out breastfeeding and care during the puerperium. Copyright: © 2018 Permanyer.
NASA Astrophysics Data System (ADS)
Llorens, Pilar; Gallart, Francesc; Latron, Jérôme; Cid, Núria; Rieradevall, Maria; Prat, Narcís
2016-04-01
Aquatic life in temporary streams is strongly conditioned by the temporal variability of the hydrological conditions that control the occurrence and connectivity of diverse mesohabitats. In this context, the software TREHS (Temporary Rivers' Ecological and Hydrological Status) has been developed, in the framework of the LIFE Trivers project, to help managers for adequately implement the Water Framework Directive in this type of water bodies. TREHS, using the methodology described in Gallart et al (2012), defines six temporal 'aquatic states', based on the hydrological conditions representing different mesohabitats, for a given reach at a particular moment. Nevertheless, hydrological data for assessing the regime of temporary streams are often non-existent or scarce. The scarcity of flow data makes frequently impossible the characterization of temporary streams hydrological regimes and, as a consequence, the selection of the correct periods and methods to determine their ecological status. Because of its qualitative nature, the TREHS approach allows the use of alternative methodologies to assess the regime of temporary streams in the lack of observed flow data. However, to adapt the TREHS to this qualitative data both the temporal scheme (from monthly to seasonal) as well as the number of aquatic states (from 6 to 3) have been modified. Two alternatives complementary methodologies were tested within the TREHS framework to assess the regime of temporary streams: interviews and aerial photographs. All the gauging stations (13) belonging to the Catalan Internal Catchments (NE, Spain) with recurrent zero flows periods were selected to validate both methodologies. On one hand, non-structured interviews were carried out to inhabitants of villages and small towns near the gauging stations. Flow permanence metrics for input into TREHS were drawn from the notes taken during the interviews. On the other hand, the historical series of available aerial photographs (typically 10) were examined. In this case, flow permanence metrics were estimated as the proportion of photographs presenting stream flow. Results indicate that for streams being more than 25% of the time dry, interviews systematically underestimated flow, but the qualitative information given by inhabitants was of great interest to understand river dynamics. On the other hand, the use of aerial photographs gave a good estimation of flow permanence, but the seasonality was conditioned to the capture date of the aerial photographs. For these reasons, we recommend to use both methodologies together.
Wu, Zhenkai; Ding, Jing; Zhao, Dahang; Zhao, Li; Li, Hai; Liu, Jianlin
2017-07-10
The multiplier method was introduced by Paley to calculate the timing for temporary hemiepiphysiodesis. However, this method has not been verified in terms of clinical outcome measure. We aimed to (1) predict the rate of angular correction per year (ACPY) at the various corresponding ages by means of multiplier method and verify the reliability based on the data from the published studies and (2) screen out risk factors for deviation of prediction. A comprehensive search was performed in the following electronic databases: Cochrane, PubMed, and EMBASE™. A total of 22 studies met the inclusion criteria. If the actual value of ACPY from the collected date was located out of the range of the predicted value based on the multiplier method, it was considered as the deviation of prediction (DOP). The associations of patient characteristics with DOP were assessed with the use of univariate logistic regression. Only one article was evaluated as moderate evidence; the remaining articles were evaluated as poor quality. The rate of DOP was 31.82%. In the detailed individual data of included studies, the rate of DOP was 55.44%. The multiplier method is not reliable in predicting the timing for temporary hemiepiphysiodesis, even though it is prone to be more reliable for the younger patients with idiopathic genu coronal deformity.
Segmented inlet nozzle for gas turbine, and methods of installation
Klompas, Nicholas
1985-01-01
A gas turbine nozzle guide vane assembly is formed of individual arcuate nozzle segments. The arcuate nozzle segments are elastically joined to each other to form a complete ring, with edges abutted to prevent leakage. The resultant nozzle ring is included within the overall gas turbine stationary structure and secured by a mounting arrangement which permits relative radial movement at both the inner and outer mountings. A spline-type outer mounting provides circumferential retention. A complete rigid nozzle ring with freedom to "float" radially results. Specific structures are disclosed for the inner and outer mounting arrangements. A specific tie-rod structure is also disclosed for elastically joining the individual nozzle segments. Also disclosed is a method of assembling the nozzle ring subassembly-by-subassembly into a gas turbine employing temporary jacks.
2015-11-13
The Administrator of the Drug Enforcement Administration is issuing this final order extending the temporary schedule I status for three synthetic phenethylamines into the Controlled Substances Act pursuant to the temporary scheduling provisions of the Act. The substances are: 2-(4-iodo-2,5-dimethoxyphenyl)-N-(2-methoxybenzyl)ethanamine (25I-NBOMe; 2C-I-NBOMe; 25I; Cimbi-5), 2-(4-chloro-2,5-dimethoxyphenyl)-N-(2-methoxybenzyl)ethanamine (25C-NBOMe; 2C-C-NBOMe; 25C; Cimbi-82), and 2-(4-bromo-2,5-dimethoxyphenyl)-N-(2-methoxybenzyl)ethanamine (25B-NBOMe; 2C-B-NBOMe; 25B; Cimbi-36) [hereinafter 25I-NBOMe, 2C-NBOMe, and 25-NBOMe, respectively]. The initial temporary scheduling was based on a finding by the Deputy Administrator that the placement of these synthetic phenethylamines and their optical, positional, and geometric isomers, salts, and salts of isomers into schedule I of the Controlled Substances Act is necessary to avoid an imminent hazard to the public safety. The current final order temporarily placing 25I-NBOMe, 25C-NBOMe, and 25B-NBOMe in schedule I is due to expire on November 14, 2015. This final order will extend the temporary scheduling of 25I-NBOMe, 25C-NBOMe, and 25B-NBOMe for one year, or until the permanent scheduling action for these three substances is completed, whichever occurs first. As a result of this order, the full effect of the Controlled Substances Act and its implementing regulations, including criminal, civil and administrative penalties, sanctions, and regulatory controls of schedule I substances will be imposed on the manufacture, distribution, possession, importation, and exportation of these synthetic phenethylamines.
Huiart, Laetitia; Ferdynus, Cyril; Dell'Aniello, Sophie; Bakiri, Naciba; Giorgi, Roch; Suissa, Samy
2014-08-01
Several studies have been conducted to estimate persistence to hormonal therapy among women with breast cancer (BC). Most studies focus on first treatment discontinuation. Patients, however, can have numerous periods of treatment discontinuation or treatment exposure. Our objective is to estimate persistence to tamoxifen in patients with BC while accounting for temporary treatment discontinuations and this by using multi-state (MS) models. A cohort of 10,806 women with BC having received at least one prescription of tamoxifen between 1998 and 2008 was constituted from the UK General Practice Research Database. We fitted a semi-Markov model with three states to estimate the probability of being off treatment over a 5-year period while accounting for temporary treatment discontinuations (transition between on treatment and off treatment) and competing risks (recurrence of BC or death). Non-persistence, as estimated from the MS model, ranged from 12.1% (95% confidence interval [95%CI]: 9.2-15.1) at 1 year to 14.9% (95%CI: 11.7-18.1) at 5 years. Estimations of non-persistence based on the Kaplan-Meier model were higher, i.e., 29.3% (95%CI: 28.1-30.6) at 5 years, as well as those obtained from a competing risk model, i.e., 24.0% (95%CI: 22.9-25.1). Most temporary discontinuations (94.7%) lasted less than 6 months. Temporary treatment discontinuations are frequent and should be accounted for when measuring adherence to treatment. MS models can provide a useful framework for this sort of analysis insofar as they help describe patients' complex behavior. This may help tailor interventions that improve persistence to hormonal therapy among women with BC. Copyright © 2014 John Wiley & Sons, Ltd.
Large capacity temporary visual memory
Endress, Ansgar D.; Potter, Mary C.
2014-01-01
Visual working memory (WM) capacity is thought to be limited to three or four items. However, many cognitive activities seem to require larger temporary memory stores. Here, we provide evidence for a temporary memory store with much larger capacity than past WM capacity estimates. Further, based on previous WM research, we show that a single factor — proactive interference — is sufficient to bring capacity estimates down to the range of previous WM capacity estimates. Participants saw a rapid serial visual presentation (RSVP) of 5 to 21 pictures of familiar objects or words presented at rates of 4/s or 8/s, respectively, and thus too fast for strategies such as rehearsal. Recognition memory was tested with a single probe item. When new items were used on all trials, no fixed memory capacities were observed, with estimates of up to 9.1 retained pictures for 21-item lists, and up to 30.0 retained pictures for 100-item lists, and no clear upper bound to how many items could be retained. Further, memory items were not stored in a temporally stable form of memory, but decayed almost completely after a few minutes. In contrast, when, as in most WM experiments, a small set of items was reused across all trials, thus creating proactive interference among items, capacity remained in the range reported in previous WM experiments. These results show that humans have a large-capacity temporary memory store in the absence of proactive interference, and raise the question of whether temporary memory in everyday cognitive processing is severely limited as in WM experiments, or has the much larger capacity found in the present experiments. PMID:23937181
Dulau, Violaine; Estrade, Vanessa; Fayan, Jacques
2017-01-01
Photo-identification surveys of Indo-Pacific bottlenose dolphins were conducted from 2009 to 2014 off Reunion Island (55°E33'/21°S07'), in the Indian Ocean. Robust Design models were applied to produce the most reliable estimate of population abundance and survival rate, while accounting for temporary emigration from the survey area (west coast). The sampling scheme consisted of a five-month (June-October) sampling period in each year of the study. The overall population size at Reunion was estimated to be 72 individuals (SE = 6.17, 95%CI = 61-85), based on a random temporary emigration (γ") of 0.096 and a proportion of 0.70 (SE = 0.03) distinct individuals. The annual survival rate was 0.93 (±0.018 SE, 95%CI = 0.886-0.958) and was constant over time and between sexes. Models considering gender groups indicated different movement patterns between males and females. Males showed null or quasi-null temporary emigration (γ" = γ' < 0.01), while females showed a random temporary emigration (γ") of 0.10, suggesting that a small proportion of females was outside the survey area during each primary sampling period. Sex-specific temporary migration patterns were consistent with movement and residency patterns observed in other areas. The Robust Design approach provided an appropriate sampling scheme for deriving island-associated population parameters, while allowing to restrict survey effort both spatially (i.e. west coast only) and temporally (five months per year). Although abundance and survival were stable over the six years, the small population size of fewer than 100 individuals suggested that this population is highly vulnerable. Priority should be given to reducing any potential impact of human activity on the population and its habitat.
20 CFR 655.34 - Validity of temporary labor certifications.
Code of Federal Regulations, 2010 CFR
2010-04-01
... TEMPORARY EMPLOYMENT OF FOREIGN WORKERS IN THE UNITED STATES Labor Certification Process and Enforcement of Attestations for Temporary Employment in Occupations Other Than Agriculture or Registered Nursing in the United...
DOT National Transportation Integrated Search
2011-12-01
INTRODUCTION: Many entities currently use recycled asphalt pavement (RAP) and other aggregates as base materials, temporary haul roads, and, in the case of RAP, hot mix asphalt construction. Several : states currently allow the use of RAP combined wi...
DOT National Transportation Integrated Search
2011-12-01
Many entities currently use recycled asphalt pavement (RAP) and other aggregates as base material, temporary haul roads, : and, in the case of RAP, hot mix asphalt construction. Several states currently allow the use of RAP combined with cement : for...
20 CFR 655.20 - Applications for temporary employment certification.
Code of Federal Regulations, 2010 CFR
2010-04-01
... LABOR TEMPORARY EMPLOYMENT OF FOREIGN WORKERS IN THE UNITED STATES Labor Certification Process and... Nursing in the United States (H-2B Workers) § 655.20 Applications for temporary employment certification...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-22
... stabilization. The BLM posted signs at main entry points to the temporary closure area. Maps of the closed roads...; HAG10-0046] Notice of Temporary Road Closure of Coal Pit Spring--Cave Gulch Road (6287-0-B0), Within the... closure. SUMMARY: Notice is hereby given that a temporary road closure to public access, use, or occupancy...
Salami, Bukola; Kirova, Anna; Hegadoren, Kathleen; Meherali, Salima; Chiu, Yvonne; Nsaliwa, Christina
2016-01-01
This study sought to examine the challenges encountered by immigrant-serving agencies in meeting the health needs of temporary foreign workers and their families in one Canadian province. The authors interviewed 11 representatives of immigrant-serving agencies and two policy makers. Some of the challenges that agencies face in delivering programs and services for temporary foreign workers and their families include the time required to build trust with this population, temporary foreign workers' reluctance to use services due to fear that it will affect their immigration status, and the emotional labor associated with working with temporary foreign workers.
Dealing with resistance in temporary agency nurses. The role of fear in identity-building processes.
Cicellin, Mariavittoria; Pezzillo Iacono, Mario; Berni, Alessia; Esposito, Vincenza
2015-01-01
The purpose of this paper is to interpret employees' resistance using the perspective of a Foucaultian/post-structuralist approach in critical management studies. The authors examine the relationship between management of diversity, based on employment contract, emotional construction of identity and processes of resistance. The authors explore the ways in which temporary agency nurses understand and experience their contract, respond to tensions regarding temporary employment, develop collective emotions and show processes of resistance. The study adopted an interpretive and qualitative approach. The authors analysed empirical material collected in the Haematology Department of a hospital in Naples, Italy, to illustrate actual experiences in the workplace. Fear turns out to be the discursive resource through which resistance is actually exerted. Through emotions, temporary nurses build a community of coping and enhance their collective identity. They use fear to develop solidarity and to mobilize collective resistance in the workplace. Although no traditional resistance behaviours are reported, they aim to undermine the reputation of top managers and challenge and re-write the prevailing discourses of the organization. The paper contributes to the critical literature because the authors analysed a relationship that is rarely theoretically and empirically examined in literature, that between employment contract, collective identity-building dynamics and processes of resistance. We showed that the creation of a community of coping enabled minorities to voice their distance from and opposition to management.
How people explain their own and others’ behavior: a theory of lay causal explanations
Böhm, Gisela; Pfister, Hans-Rüdiger
2015-01-01
A theoretical model is proposed that specifies lay causal theories of behavior; and supporting experimental evidence is presented. The model’s basic assumption is that different types of behavior trigger different hypotheses concerning the types of causes that may have brought about the behavior. Seven categories are distinguished that are assumed to serve as both behavior types and explanation types: goals, dispositions, temporary states such as emotions, intentional actions, outcomes, events, and stimulus attributes. The model specifies inference rules that lay people use when explaining behavior (actions are caused by goals; goals are caused by higher order goals or temporary states; temporary states are caused by dispositions, stimulus attributes, or events; outcomes are caused by actions, temporary states, dispositions, stimulus attributes, or events; events are caused by dispositions or preceding events). Two experiments are reported. Experiment 1 showed that free-response explanations followed the assumed inference rules. Experiment 2 demonstrated that explanations which match the inference rules are generated faster and more frequently than non-matching explanations. Together, the findings support models that incorporate knowledge-based aspects into the process of causal explanation. The results are discussed with respect to their implications for different stages of this process, such as the activation of causal hypotheses and their subsequent selection, as well as with respect to social influences on this process. PMID:25741306
Mann, Claire L; Gillezeau, Christina N; Massazza, Alessandro; Lyons, Daniel J; Tanaka, Kanata; Yonekura, Kazuma; Sekine, Hideharu; Yanagisawa, Robert; Katz, Craig L
2018-06-01
Six years after the March 2011 Triple Disaster, over 35,000 Japanese individuals remain in temporary housing. Evacuated residents, many of who are elderly, face mental health challenges. This study evaluates the well being of individuals living in temporary housing within Fukushima. Reactions to relocation were explored using Photovoice, a community-based participatory research method, in which a set of research questions are examined qualitatively through photographs and interviews. Seven participants (average age = 69.7) were provided cameras to answer a set of self-generated questions, a process that was repeated three times. An initial analysis found resilience among participants, which was explored using a theoretical framework of resiliency. Residents discussed how relocation has disrupted their lives and coping strategies they employ to ameliorate stressors. They were often optimistic and future-oriented, stating that they wanted to "live strong" after the disaster. These resilient mindsets were personified in action: all engaged in hobbies, critical for their emotional well being. Participants also emphasized the importance of community and familial support. The evidence of resilience in participants is encouraging, suggesting that these vulnerable elderly internally displaced residents are recovering from the disruption of relocation. These themes should be explored in larger temporary housing communities. Considering the number of relocated individuals today, understanding how to foster resilience could be used to inform the development of future temporary housing shelters.
Madigan, Dana; Forst, Linda; Friedman, Lee S
2017-01-01
The physical and psychological risks of temporary employment are well documented but there are still many questions regarding the consequences of injuries among these workers. This analysis examines Illinois Workers' Compensation Commission filings from 2007 through 2012 to compare total cost of the decision, days of work missed, and percent disability of employees of temporary agencies with direct hire claims. Total award median was $5,813.66 for direct hire employees and $2,625.00 for temporary workers. Of those employees claiming time off from work, median total time off was 1.3 weeks for direct hire employees compared to 1.2 weeks for temporary workers. Median total percent disability was 16.0% for direct hire and 10.0% for temporary employees. There are differences between temporary workers and direct hire employees in terms of total workers' compensation awards, total time off, and percent disability. Additional studies are needed to validate these findings. Am. J. Ind. Med. 60:11-19, 2017. © 2016 Wiley Periodicals, Inc. © 2016 Wiley Periodicals, Inc.
CT-guided injection of the anterior and middle scalene muscles: technique and complications.
Mashayekh, A; Christo, P J; Yousem, D M; Pillai, J J
2011-03-01
Anterior scalene block is a helpful diagnostic test for NTOS and a good predictor of surgical outcome. The purpose of this study was to describe the technique, success rate, and complications associated with CT-guided anesthetic and botulinum toxin injection of the ASM/MSM in patients with NTOS symptoms. One hundred six participants (mean age, 41.5 ± 10 years; 80 women) were identified via a retrospective review of medical records for CT-guided scalene blocks. The procedure was evaluated regarding the technical success, defined as satisfactory detection of the ASM/MSM; intramuscular needle placement; intramuscular injection of contrast; appropriate delivery of medication; and frequency of unintended BP block or other complications. We also determined the outcome of patients who underwent surgery following the block. Study participants underwent 146 scalene injections, 83 blocks, and 63 chemodenervations, which were included in this investigation. In all cases, detection of the ASM/MSM and intramuscular needle placement was satisfactory. Postprocedural complications included 5 (3.4%) temporary BP blocks, 1 patient with (0.7%) Horner sign, 7 (4.8%) needle-induced pain reports, 1 (0.7%) case of dysphagia, and 2 (1.4%) instances of muscle weakness. There were no major complications reported. The rate of good outcome following surgery was the same in patients with positive versus negative blocks, 30/43 (70%) versus 5/7 (71%), respectively. CT guidance is a useful adjunct in performing accurate ASM/MSM blocks with a low rate of minor complications.
Faith-Based Versus Fact-Based Social Policy: The Case of Teenage Pregnancy Prevention
ERIC Educational Resources Information Center
Marx, Jerry D.; Hopper, Fleur
2005-01-01
The Clinton administration's 1996 welfare reform legislation contained a "charitable choice" clause, a provision that encourages states to increase the involvement of religious organizations in federal programs such as Temporary Assistance to Needy Families. The administration of George W. Bush has intensified and extended this policy…
26 CFR 1.482-0T - Outline of regulations under section 482 (temporary).
Code of Federal Regulations, 2010 CFR
2010-04-01
... stock-based compensation with the IDA. (iii) Measurement and timing of stock-based compensation IDC. (A... accepted accounting principles. (4) Time and manner of making the election. (C) Consistency. (4) IDC share... rate. (C) Example. (vi) Financial projections. (vii) Accounting principles. (A) In general. (B...
A Study of Comparative Management Styles in Japan and Korea.
1982-06-01
of temporary employees. These temporary workers are mostly women . Even today, it is not common that a major Japanese firm will hire women into...professional jobs except a few labor-intensive industries. Women workers are gener- ally considered temporary employees and are the first to be laid off in...primarily as suppliers to the major firms. The combination of bonus payments, temporary employ- ment of women workers, and existence of small firms
2014-07-28
This document contains final regulations that provide guidance on the annual fee imposed on covered entities engaged in the business of manufacturing or importing branded prescription drugs. This fee was enacted by section 9008 of the Patient Protection and Affordable Care Act, as amended by section 1404 of the Health Care and Education Reconciliation Act of 2010. This document also withdraws the Branded Prescription Drug Fee temporary regulations and contains new temporary regulations regarding the definition of controlled group that apply beginning on January 1, 2015. The final regulations and the new temporary regulations affect persons engaged in the business of manufacturing or importing certain branded prescription drugs. The text of the temporary regulations in this document also serves as the text of proposed regulations set forth in a notice of proposed rulemaking (REG-123286-14) on this subject in the Proposed Rules section in this issue of the Federal Register.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-27
...This document contains temporary regulations that provide guidance on the application of sections 162(a) and 263(a) of the Internal Revenue Code to amounts paid to acquire, produce, or improve tangible property. The temporary regulations clarify and expand the standards in the current regulations under sections 162(a) and 263(a) and provide certain bright-line tests (for example, a de minimis rule for certain acquisitions) for applying these standards. The temporary regulations also provide guidance under section 168 regarding the accounting for, and dispositions of, property subject to section 168. The temporary regulations also amend the general asset account regulations. The temporary regulations will affect all taxpayers that acquire, produce, or improve tangible property. The text of the temporary regulations also serves as the text of proposed regulations set forth in the notice of proposed rulemaking on this subject appearing elsewhere in this issue of the Federal Register.
Minimization of socioeconomic disruption for displaced populations following disasters.
El-Anwar, Omar; El-Rayes, Khaled; Elnashai, Amr
2010-07-01
In the aftermath of catastrophic natural disasters such as hurricanes, tsunamis and earthquakes, emergency management agencies come under intense pressure to provide temporary housing to address the large-scale displacement of the vulnerable population. Temporary housing is essential to enable displaced families to reestablish their normal daily activities until permanent housing solutions can be provided. Temporary housing decisions, however, have often been criticized for their failure to fulfil the socioeconomic needs of the displaced families within acceptable budgets. This paper presents the development of (1) socioeconomic disruption metrics that are capable of quantifying the socioeconomic impacts of temporary housing decisions on displaced populations; and (2) a robust multi-objective optimization model for temporary housing that is capable of simultaneously minimizing socioeconomic disruptions and public expenditures in an effective and efficient manner. A large-scale application example is optimized to illustrate the use of the model and demonstrate its capabilities ingenerating optimal plans for realistic temporary housing problems.
Christopoulos, Vassilios N; Bonaiuto, James; Kagan, Igor; Andersen, Richard A
2015-08-19
The posterior parietal cortex (PPC) has traditionally been considered important for awareness, spatial perception, and attention. However, recent findings provide evidence that the PPC also encodes information important for making decisions. These findings have initiated a running argument of whether the PPC is critically involved in decision making. To examine this issue, we reversibly inactivated the parietal reach region (PRR), the area of the PPC that is specialized for reaching movements, while two monkeys performed a memory-guided reaching or saccade task. The task included choices between two equally rewarded targets presented simultaneously in opposite visual fields. Free-choice trials were interleaved with instructed trials, in which a single cue presented in the peripheral visual field defined the reach and saccade target unequivocally. We found that PRR inactivation led to a strong reduction of contralesional choices, but only for reaches. On the other hand, saccade choices were not affected by PRR inactivation. Importantly, reaching and saccade movements to single instructed targets remained largely intact. These results cannot be explained as an effector-nonspecific deficit in spatial attention or awareness, since the temporary "lesion" had an impact only on reach choices. Hence, the PPR is a part of a network for reach decisions and not just reach planning. There has been an ongoing debate on whether the posterior parietal cortex (PPC) represents only spatial awareness, perception, and attention or whether it is also involved in decision making for actions. In this study we explore whether the parietal reach region (PRR), the region of the PPC that is specialized for reaches, is involved in the decision process. We inactivated the PRR while two monkeys performed reach and saccade choices between two targets presented simultaneously in both hemifields. We found that inactivation affected only the reach choices, while leaving saccade choices intact. These results cannot be explained as a deficit in attention, since the temporary lesion affected only the reach choices. Thus, PRR is a part of a network for making reach decisions. Copyright © 2015 the authors 0270-6474/15/3511719-10$15.00/0.
2013-01-01
Background To investigate the feasibility and dosimetric improvements of a novel technique to temporarily displace critical structures in the pelvis and abdomen from tumor during high-dose radiotherapy. Methods Between 2010 and 2012, 11 patients received high-dose image-guided intensity-modulated radiotherapy with temporary organ displacement (TOD) at our institution. In all cases, imaging revealed tumor abutting critical structures. An all-purpose drainage catheter was introduced between the gross tumor volume (GTV) and critical organs at risk (OAR) and infused with normal saline (NS) containing 5-10% iohexol. Radiation planning was performed with the displaced OARs and positional reproducibility was confirmed with cone-beam CT (CBCT). Patients were treated within 36 hours of catheter placement. Radiation plans were re-optimized using pre-TOD OARs to the same prescription and dosimetrically compared with post-TOD plans. A two-tailed permutation test was performed on each dosimetric measure. Results The bowel/rectum was displaced in six patients and kidney in four patients. One patient was excluded due to poor visualization of the OAR; thus 10 patients were analyzed. A mean of 229 ml (range, 80–1000) of NS 5-10% iohexol infusion resulted in OAR mean displacement of 17.5 mm (range, 7–32). The median dose prescribed was 2400 cGy in one fraction (range, 2100–3000 in 3 fractions). The mean GTV Dmin and PTV Dmin pre- and post-bowel TOD IG-IMRT dosimetry significantly increased from 1473 cGy to 2086 cGy (p=0.015) and 714 cGy to 1214 cGy (p=0.021), respectively. TOD increased mean PTV D95 by 27.14% of prescription (p=0.014) while the PTV D05 decreased by 9.2% (p=0.011). TOD of the bowel resulted in a 39% decrease in mean bowel Dmax (p=0.008) confirmed by CBCT. TOD of the kidney significantly decreased mean kidney dose and Dmax by 25% (0.022). Conclusions TOD was well tolerated, reproducible, and facilitated dose escalation to previously radioresistant tumors abutting critical structures while minimizing dose to OARs. PMID:23800073
29 CFR 101.37 - Application for temporary relief or restraining orders.
Code of Federal Regulations, 2010 CFR
2010-07-01
... PROCEDURES Procedure Under Section 10 (j) and (l) of the Act § 101.37 Application for temporary relief or restraining orders. Whenever it is deemed advisable to seek temporary injunctive relief under section 10(j) or...
Avoiding treatment bias of REDD+ monitoring by sampling with partial replacement.
Köhl, Michael; Scott, Charles T; Lister, Andrew J; Demon, Inez; Plugge, Daniel
2015-12-01
Implementing REDD+ renders the development of a measurement, reporting and verification (MRV) system necessary to monitor carbon stock changes. MRV systems generally apply a combination of remote sensing techniques and in-situ field assessments. In-situ assessments can be based on 1) permanent plots, which are assessed on all successive occasions, 2) temporary plots, which are assessed only once, and 3) a combination of both. The current study focuses on in-situ assessments and addresses the effect of treatment bias, which is introduced by managing permanent sampling plots differently than the surrounding forests. Temporary plots are not subject to treatment bias, but are associated with large sampling errors and low cost-efficiency. Sampling with partial replacement (SPR) utilizes both permanent and temporary plots. We apply a scenario analysis with different intensities of deforestation and forest degradation to show that SPR combines cost-efficiency with the handling of treatment bias. Without treatment bias permanent plots generally provide lower sampling errors for change estimates than SPR and temporary plots, but do not provide reliable estimates, if treatment bias occurs, SPR allows for change estimates that are comparable to those provided by permanent plots, offers the flexibility to adjust sample sizes in the course of time, and allows to compare data on permanent versus temporary plots for detecting treatment bias. Equivalence of biomass or carbon stock estimates between permanent and temporary plots serves as an indication for the absence of treatment bias while differences suggest that there is evidence for treatment bias. SPR is a flexible tool for estimating emission factors from successive measurements. It does not entirely depend on sample plots that are installed at the first occasion but allows for the adjustment of sample sizes and placement of new plots at any occasion. This ensures that in-situ samples provide representative estimates over time. SPR offers the possibility to increase sampling intensity in areas with high degradation intensities or to establish new plots in areas where permanent plots are lost due to deforestation. SPR is also an ideal approach to mitigate concerns about treatment bias.
Code of Federal Regulations, 2011 CFR
2011-01-01
... assets arising from deductible temporary differences that exceed the amount of taxes previously paid that could be recovered through loss carrybacks if existing temporary differences (both deductible and.... (ii) For purposes of this limitation, all existing temporary differences should be assumed to fully...
Code of Federal Regulations, 2012 CFR
2012-01-01
... assets arising from deductible temporary differences that exceed the amount of taxes previously paid that could be recovered through loss carrybacks if existing temporary differences (both deductible and.... (ii) For purposes of this limitation, all existing temporary differences should be assumed to fully...
47 CFR 1.931 - Application for special temporary authority.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Grants by Random Selection Wireless Radio Services Applications and Proceedings Application Requirements and Procedures § 1.931 Application for special temporary authority. (a) Wireless Telecommunications Services. (1) In circumstances requiring immediate or temporary use of station in the Wireless...
47 CFR 1.931 - Application for special temporary authority.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Grants by Random Selection Wireless Radio Services Applications and Proceedings Application Requirements and Procedures § 1.931 Application for special temporary authority. (a) Wireless Telecommunications Services. (1) In circumstances requiring immediate or temporary use of station in the Wireless...
47 CFR 1.931 - Application for special temporary authority.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Grants by Random Selection Wireless Radio Services Applications and Proceedings Application Requirements and Procedures § 1.931 Application for special temporary authority. (a) Wireless Telecommunications Services. (1) In circumstances requiring immediate or temporary use of station in the Wireless...
47 CFR 1.931 - Application for special temporary authority.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Wireless Radio Services Applications and Proceedings Application Requirements and Procedures § 1.931 Application for special temporary authority. (a) Wireless Telecommunications Services. (1) In circumstances requiring immediate or temporary use of station in the Wireless Telecommunications Services, carriers may...
47 CFR 1.931 - Application for special temporary authority.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Wireless Radio Services Applications and Proceedings Application Requirements and Procedures § 1.931 Application for special temporary authority. (a) Wireless Telecommunications Services. (1) In circumstances requiring immediate or temporary use of station in the Wireless Telecommunications Services, carriers may...
75 FR 33651 - Sunshine Act; Notice of Agency Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-14
... for Insurance, Interest Rate Risk Policy and Program. 4. Insurance Fund Report. 5. Temporary Corporate Credit Union Stabilization Fund Accounting Standard. 6. Temporary Corporate Credit Union Stabilization Fund Payment of Insured Shares. 7. Temporary Corporate Credit Union Stabilization Fund Assessment...
Code of Federal Regulations, 2010 CFR
2010-01-01
... (ii) The date of the divorce or annulment. (e) If an individual who is eligible for temporary... determines that an eligible individual was unable, for cause beyond his or her control, to elect temporary...
47 CFR 76.29 - Special temporary authority.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 47 Telecommunication 4 2012-10-01 2012-10-01 false Special temporary authority. 76.29 Section 76.29 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES MULTICHANNEL VIDEO AND CABLE TELEVISION SERVICE Registration Statements § 76.29 Special temporary authority. (a...
47 CFR 76.29 - Special temporary authority.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 4 2011-10-01 2011-10-01 false Special temporary authority. 76.29 Section 76.29 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES MULTICHANNEL VIDEO AND CABLE TELEVISION SERVICE Registration Statements § 76.29 Special temporary authority. (a...
47 CFR 76.29 - Special temporary authority.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 47 Telecommunication 4 2013-10-01 2013-10-01 false Special temporary authority. 76.29 Section 76.29 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES MULTICHANNEL VIDEO AND CABLE TELEVISION SERVICE Registration Statements § 76.29 Special temporary authority. (a...
47 CFR 76.29 - Special temporary authority.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 47 Telecommunication 4 2014-10-01 2014-10-01 false Special temporary authority. 76.29 Section 76.29 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES MULTICHANNEL VIDEO AND CABLE TELEVISION SERVICE Registration Statements § 76.29 Special temporary authority. (a...
Nearby Search Indekos Based Android Using A Star (A*) Algorithm
NASA Astrophysics Data System (ADS)
Siregar, B.; Nababan, EB; Rumahorbo, JA; Andayani, U.; Fahmi, F.
2018-03-01
Indekos or rented room is a temporary residence for months or years. Society of academicians who come from out of town need a temporary residence, such as Indekos or rented room during their education, teaching, or duties. They are often found difficulty in finding a Indekos because lack of information about the Indekos. Besides, new society of academicians don’t recognize the areas around the campus and desire the shortest path from Indekos to get to the campus. The problem can be solved by implementing A Star (A*) algorithm. This algorithm is one of the shortest path algorithm to a finding shortest path from campus to the Indekos application, where the faculties in the campus as the starting point of the finding. Determination of the starting point used in this study aims to allow students to determine the starting point in finding the Indekos. The mobile based application facilitates the finding anytime and anywhere. Based on the experimental results, A* algorithm can find the shortest path with 86,67% accuracy.
Estimation of temporary emigration in male toads
Muths, E.; Scherer, R. D.; Corn, P.S.; Lambert, B.A.
2006-01-01
Male boreal toads (Bufo boreas) are thought to return to the breeding site every year but, if absent in a particular year, will be more likely to return the following year. Using Pollock's robust design we estimated temporary emigration (the probability a male toad is absent from a breeding site in a given year) at three locations in Colorado, USA: two in Rocky Mountain National Park and one in Chaffee County. We present data that suggest that not all male toads return to the breeding site every year. Our analyses indicate that temporary emigration varies by site and time (for example, from 1992 to 1998, the probability of temporary emigration ranged from 10% to 29% and from 3% to 95% at Lost Lake and Kettle Tarn, respectively). Although the results provide weak evidence that males are more likely to return after a year's hiatus, a general pattern of state-dependent temporary emigration was not supported. We also hypothesized relationships between temporary emigration and a number of weather variables. While some competitive models included weather covariates, imprecise and variable estimates of the effects of these covariates precluded fully defining their impact on temporary emigration. ?? 2006 by the Ecological Society of America.
The effects of temporary agency work contract transitions on well-being.
Chambel, Maria José; Lopes, Silvia; Batista, Josilene
2016-11-01
Theoretical and empirical research has provided mixed arguments and evidence for the effects of temporary agency work on workers' well-being. This study aims to go one critical step further by comparing the workplace and general well-being of workers who continue to have this employment status with others who obtain a direct contract and others who remain unemployed. Temporary agency workers longitudinal data (n = 289) was used, and three groups were compared: (1) maintaining a temporary agency contract (n = 187), (2) obtaining a direct contract (n = 57), and (3) remaining unemployed (n = 45). Covariance analyses adjusted for background variables showed that those who obtained a direct contract experienced a decrease in job insecurity but experienced an increase in job demands, while those who continued to have a temporary agency contract maintained these job conditions. However, in terms of workplace well-being, the temporary agency contract was not found to be more detrimental than a direct contract, but in terms of life satisfaction, unemployment was found to be more detrimental than other transitions. A temporary agency contract does not have an inevitable negative effect on workers' well-being.
43 CFR 3481.4 - Temporary interruption in coal severance.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false Temporary interruption in coal severance... LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) COAL EXPLORATION AND MINING OPERATIONS RULES General Provisions § 3481.4 Temporary interruption in coal severance. ...
43 CFR 3481.4 - Temporary interruption in coal severance.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false Temporary interruption in coal severance... LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) COAL EXPLORATION AND MINING OPERATIONS RULES General Provisions § 3481.4 Temporary interruption in coal severance. ...
43 CFR 3481.4 - Temporary interruption in coal severance.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false Temporary interruption in coal severance... LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) COAL EXPLORATION AND MINING OPERATIONS RULES General Provisions § 3481.4 Temporary interruption in coal severance. ...
43 CFR 3481.4 - Temporary interruption in coal severance.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Temporary interruption in coal severance... LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) COAL EXPLORATION AND MINING OPERATIONS RULES General Provisions § 3481.4 Temporary interruption in coal severance. ...
47 CFR 32.22 - Comprehensive interperiod tax allocation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... book/tax temporary differences which would be considered material for published financial report purposes. Furthermore, companies shall also apply interperiod tax allocation if any item or group of... the temporary difference. The tax effects of book/tax temporary differences shall be normalized and...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-19
... for the Temporary Agricultural Employment of H-2A Aliens in the United States AGENCIES: Employment and... temporary or seasonal agricultural employment. See, Temporary Agricultural Employment of H-2A Aliens in the...
26 CFR 1.6031(b)-2T - REMIC reporting requirements (temporary). [Reserved
Code of Federal Regulations, 2010 CFR
2010-04-01
... requirements (temporary). [Reserved] ... 26 Internal Revenue 13 2010-04-01 2010-04-01 false REMIC reporting requirements (temporary). [Reserved] 1.6031(b)-2T Section 1.6031(b)-2T Internal Revenue INTERNAL REVENUE SERVICE, DEPARTMENT OF THE...
Use of Private Sector Temporaries.
1995-01-01
causing the reduction in personnel. My solution to this problem is to authorize and find the use of private sector temporaries to perform the workload...discuss cost factors, and describe the benefits Defense Finance and Accounting Service will receive by using private sector temporaries (AN)
12 CFR 370.11 - Enforcement mechanisms.
Code of Federal Regulations, 2010 CFR
2010-01-01
... TEMPORARY LIQUIDITY GUARANTEE PROGRAM § 370.11 Enforcement mechanisms. (a) Termination of Participation. If... participate in the temporary liquidity guarantee program, the FDIC will inform the entity that it will no longer be provided the protections of the temporary liquidity guarantee program. (1) Termination of...
47 CFR 74.433 - Temporary authorizations.
Code of Federal Regulations, 2014 CFR
2014-10-01
... identification number of the associated broadcast station or stations, call letters of remote pickup station (if..., AUXILIARY, SPECIAL BROADCAST AND OTHER PROGRAM DISTRIBUTIONAL SERVICES Remote Pickup Broadcast Stations § 74.433 Temporary authorizations. (a) Special temporary authority may be granted for remote pickup station...
47 CFR 74.433 - Temporary authorizations.
Code of Federal Regulations, 2012 CFR
2012-10-01
... identification number of the associated broadcast station or stations, call letters of remote pickup station (if..., AUXILIARY, SPECIAL BROADCAST AND OTHER PROGRAM DISTRIBUTIONAL SERVICES Remote Pickup Broadcast Stations § 74.433 Temporary authorizations. (a) Special temporary authority may be granted for remote pickup station...
47 CFR 74.433 - Temporary authorizations.
Code of Federal Regulations, 2011 CFR
2011-10-01
... identification number of the associated broadcast station or stations, call letters of remote pickup station (if..., AUXILIARY, SPECIAL BROADCAST AND OTHER PROGRAM DISTRIBUTIONAL SERVICES Remote Pickup Broadcast Stations § 74.433 Temporary authorizations. (a) Special temporary authority may be granted for remote pickup station...
47 CFR 74.433 - Temporary authorizations.
Code of Federal Regulations, 2013 CFR
2013-10-01
... identification number of the associated broadcast station or stations, call letters of remote pickup station (if..., AUXILIARY, SPECIAL BROADCAST AND OTHER PROGRAM DISTRIBUTIONAL SERVICES Remote Pickup Broadcast Stations § 74.433 Temporary authorizations. (a) Special temporary authority may be granted for remote pickup station...
Hao, Lingxin
2015-01-01
In 1990 a temporary-to-permanent pathway was established for highly skilled workers admitted to the United States under nonimmigrant programs. The paper argues that this policy shift has allowed employers to play a crucial role in the immigration of highly skilled workers, thereby creating labor-market institutional selection that gives a salary advantage to highly skilled temporary-admitted workers retained in the United States. Through analyses of the salary differentials among admission-category groups, the paper finds that the salary advantage is based on recruitment from Western countries, adjustment from temporary to permanent status after a second employer screening, working in the information technology sector and the private sector, holding a supervisory position, or having a skill-matched job, all of which are consequences of institutional selection rather than individual self-selection. Our results also reveal a difference between those admitted from abroad and those recruited from graduating foreign students in USA higher educational institutions, which suggests a distinction between overseas hiring and domestic hiring. Policy implications for the United States and other receiving countries are discussed. PMID:26269690
18. Photographic copy of site plan for additions to North ...
18. Photographic copy of site plan for additions to North Base: Job No. Muroc A(511), Military Construction, Third District Region, San Bernardino, California; Muroc Bombing Range, Muroc Lake, Calif; Additional Temporary Construction, Materiel Center Flight Test Base, Location Plan, February 1943. Reproduced from the holdings of the National Archives, Pacific Southwest Region - Edwards Air Force Base, North Base, North Base Road, Boron, Kern County, CA
Hindman, Bradley J; Bayman, Emine O; Pfisterer, Wolfgang K; Torner, James C; Todd, Michael M
2010-01-01
Although hypothermia and barbiturates improve neurologic outcomes in animal temporary focal ischemia models, the clinical efficacy of these interventions during temporary occlusion of the cerebral vasculature during intracranial aneurysm surgery (temporary clipping) is not established. A post hoc analysis of patients from the Intraoperative Hypothermia for Aneurysm Surgery Trial who underwent temporary clipping was performed. Univariate and multivariate logistic regression methods were used to test for associations between hypothermia, supplemental protective drug, and short- (24-h) and long-term (3-month) neurologic outcomes. An odds ratio more than 1 denotes better outcome. Patients undergoing temporary clipping (n = 441) were assigned to intraoperative hypothermia (33.3 degrees +/- 0.8 degrees C, n = 208) or normothermia (36.7 degrees +/- 0.5 degrees C, n = 233), with 178 patients also receiving supplemental protective drug (thiopental or etomidate) during temporary clipping. Three months after surgery, 278 patients (63%) had good outcome (Glasgow Outcome Score = 1). Neither hypothermia (P = 0.847; odds ratio = 1.043, 95% CI = 0.678-1.606) nor supplemental protective drug (P = 0.835; odds ratio = 1.048, 95% CI = 0.674-1.631) were associated with 3-month Glasgow Outcome Score. The effect of supplemental protective drug did not significantly vary with temperature. The effects of hypothermia and protective drug did not significantly vary with temporary clip duration. Similar findings were made for 24-h neurologic status and 3-month Neuropsychological Composite Score. In the Intraoperative Hypothermia for Aneurysm Surgery Trial, neither systemic hypothermia nor supplemental protective drug affected short- or long-term neurologic outcomes of patients undergoing temporary clipping.
Obesity in elementary school children after the Great East Japan Earthquake.
Moriyama, Hidenori; Fuchimukai, Toru; Kondo, Naoki; Takayama, John I
2018-03-01
Rikuzentakata was one of the cities most devastated by the Great East Japan Earthquake on 11 March 2011. Many buildings were swept away or destroyed and affected families were placed into temporary housing. The aim of this study was to determine the impact of long-term temporary housing on the body mass index (BMI) of elementary school children living in Rikuzentakata City. A retrospective cohort study of was carried out of students attending 1st-3rd grade in 2010, and 4th-6th grade in 2013, in eight elementary schools in Rikuzentakata City. Height and weight were measured annually. We compared changes in BMI between children in temporary housing and those in permanent housing. Separately, parents of students attending one of the elementary schools were surveyed in 2013. Of 526 children in the present study, 32% were living in temporary housing. The prevalence of obesity climbed from 5.3% in 2010 to 7.8% in 2013 in the temporary housing group, and from 7.6% to 7.8% in the permanent housing group. BMI z-score in the temporary housing group increased by 0.102 points between 2010 and 2013 (P < 0.02). Children in temporary housing spent more time reading comic books and their walking commute time had decreased by 2 min compared with before the disaster. Obesity prevalence and BMI z-score increased in children in temporary housing compared with permanent housing. A more sedentary lifestyle may explain this trend. It is important for policy makers and health-care providers to recognize potential consequences of long-term residence in temporary housing. © 2017 Japan Pediatric Society.
Del Forno, E; Candura, F
2002-01-01
In recent years, labour market has really changed in Italy: in addition to traditional categories of workers, self-governing or subordinate, a "tertium genus" was born, that of "temporary workers". This new modality allows firms which need to introduce temporary workers in production processes, to find them through the activity of skilled intermediary agencies. This type of agencies, regularly authorized by the Ministry of Labour, was born to select subordinates, who will work in other firms, without engagement. (The low which regulates temporary work in Italy is the Act n. 196 of 1997). The subject analysed the most closely in the text, is the really interesting question of responsibility for prevention, safety and health in work places: in fact, temporary work creates a complex system of bilateral relations, but the only real work contract is between provider firms and temporary workers. The Act n. 196 states that the provider firm must fulfill its duties of contribution, security, aid and insurance against industrial accidents and occupational diseases. Therefore, according to a series of argumentations developed in the text, only the occupational health consultant designated by the temporary agency is reasonably responsible for medical supervision, but he has to coordinate and collaborate with the occupational health consultant of third firms (Directive 383 of 1991 and article 7 of Legislative Decree n. 626 of 1994). On the contrary, firms which need temporary workers, must fulfill duties of information and training for workers. As a consequence, to draw a conclusion, on the ground of principles of European Union and national laws (in force since '50s in this field), the responsibility for medical supervision falls on temporary agencies; on the contrary, economic responsibility falls on firms which request workers, in order to achieve protection of workers' health.
25. VIEW OF EARTHQUAKEDAMAGED TRUSS MEMBER AT #070, SUPPORTED BY ...
25. VIEW OF EARTHQUAKE-DAMAGED TRUSS MEMBER AT #070, SUPPORTED BY TEMPORARY BRACING, LOOKING NORTHEAST TO SOUTHWEST - Oakland Army Base, Transit Shed, East of Dunkirk Street & South of Burma Road, Oakland, Alameda County, CA
Virtual Enterprises and Vocational Training.
ERIC Educational Resources Information Center
Kreber, Stefan
2001-01-01
Characteristics of virtual enterprises (client oriented, temporary working organizations that dissolve after solving specific problems, extensive technological applications) can be applied to vocational training. Virtual learning centers can provide web-based training intraorganizationally and interorganizationally via intranets and extranets. (SK)
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-23
... implementing regulations at 45 CFR part 149, employment-based plans that offer health benefits to early retirees and their spouses, surviving spouses and dependents are eligible under a temporary program to...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-22
... Act and implementing regulations at 45 CFR Part 149, employment-based plans that offer health benefits to early retirees and their spouses, surviving spouses and dependents are eligible under a temporary...
Extracellular matrix proteins as temporary coating for thin-film neural implants
NASA Astrophysics Data System (ADS)
Ceyssens, Frederik; Deprez, Marjolijn; Turner, Neill; Kil, Dries; van Kuyck, Kris; Welkenhuysen, Marleen; Nuttin, Bart; Badylak, Stephen; Puers, Robert
2017-02-01
Objective. This study investigates the suitability of a thin sheet of extracellular matrix (ECM) proteins as a resorbable coating for temporarily reinforcing fragile or ultra-low stiffness thin-film neural implants to be placed on the brain, i.e. microelectrocorticographic (µECOG) implants. Approach. Thin-film polyimide-based electrode arrays were fabricated using lithographic methods. ECM was harvested from porcine tissue by a decellularization method and coated around the arrays. Mechanical tests and an in vivo experiment on rats were conducted, followed by a histological tissue study combined with a statistical equivalence test (confidence interval approach, 0.05 significance level) to compare the test group with an uncoated control group. Main results. After 3 months, no significant damage was found based on GFAP and NeuN staining of the relevant brain areas. Significance. The study shows that ECM sheets are a suitable temporary coating for thin µECOG neural implants.
Huettig, Fabian; Prutscher, Andreas; Goldammer, Christoph; Kreutzer, Curt A; Weber, Heiner
2016-01-01
The clinical performance of polymethylmethacrylate (PMMA)-based fixed dental prostheses (FDP) was evaluated in the indication of long-term temporaries. In the current indication of the applied machinable PMMA-based material (Vita CAD-Temp), i.e. temporary crowns and FDPs, 27 patients with compromised dentitions (uncertain dental prognosis or postponement of a removable treatment option) were recruited and 45 FDPs (3 or 4 units, 37 terminal-retained, 8 cantilevered) were inserted. Frameworks were computer-aided design (CAD)/computer-aided manufacturing (CAM)-manufactured after conventional impression taking and labside scanning of stone master casts. A resin-modified hybrid cement material (RelyX Unicem) was used for luting in a conventional protocol. Clinical follow-up was performed biannually. Over an observation time from 2 to 26 months (median 13 months), 11 complications were found in 9 out of 45 PMMA restorations: 4 losses of retention, 5 complete fractures; two of these subsequent to a trepanation for endodontic treatment. Thereby, 3 out of 8 cantilevered FDPs had to be removed within 8 months. Thus, the statistical evaluation included FDPs with abutment at end, only. These standard design FDPs (n = 37) showed a 90.4 % survival rate with a complication-free rate of 88.3 % estimated for an observation time of 16 months. Cantilevered FDPs and reconstructions on abutment teeth with markedly reduced biological prognosis or endodontic intervention yielded a high-failure rate. Terminal-retained FDPs performed clinically well in cases without compromised abutment teeth. PMMA-based material might be used successfully for long-term temporization with 3- to 4-unit FDPs in a standard design over at least one year.
Locating Home: Newcomer Youths' School and Community Engagement
ERIC Educational Resources Information Center
Deckers, Chrissy Michelle; Zinga, Dawn
2012-01-01
This study explored how diversity among newcomer youth may explain differences in engagement and school success. Youth identifying fear-based reasons for relocation reported being less involved within their schools than those who identified social mobility. In fear-based relocation, youth often viewed Canada as a temporary place to live and gain…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-03
... other things, that transactions in security-based swaps be cleared through a clearing agency that is... Reserve System, shall, among other things, jointly further define the terms ``swap'' and ``security- based... SECURITIES AND EXCHANGE COMMISSION [Release No. 34-63389; File No. S7-16-09] Order Extending...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-29
... Activities: Declaration of Ultimate Consignee That Articles Were Exported for Temporary Scientific or... the Declaration of Ultimate Consignee That Articles Were Exported for Temporary Scientific or...: Title: Declaration of Ultimate Consignee That Articles Were Exported for Temporary Scientific or...
20 CFR 655.1301 - Applications for temporary employment certification in agriculture.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 20 Employees' Benefits 3 2012-04-01 2012-04-01 false Applications for temporary employment certification in agriculture. 655.1301 Section 655.1301 Employees' Benefits EMPLOYMENT AND TRAINING... Applications for temporary employment certification in agriculture. (a) Application filing requirements. (1) An...
20 CFR 655.1301 - Applications for temporary employment certification in agriculture.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Applications for temporary employment certification in agriculture. 655.1301 Section 655.1301 Employees' Benefits EMPLOYMENT AND TRAINING... Applications for temporary employment certification in agriculture. (a) Application filing requirements. (1) An...
20 CFR 655.1301 - Applications for temporary employment certification in agriculture.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 20 Employees' Benefits 3 2013-04-01 2013-04-01 false Applications for temporary employment certification in agriculture. 655.1301 Section 655.1301 Employees' Benefits EMPLOYMENT AND TRAINING... Applications for temporary employment certification in agriculture. (a) Application filing requirements. (1) An...
20 CFR 655.1301 - Applications for temporary employment certification in agriculture.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 20 Employees' Benefits 3 2014-04-01 2014-04-01 false Applications for temporary employment certification in agriculture. 655.1301 Section 655.1301 Employees' Benefits EMPLOYMENT AND TRAINING... Applications for temporary employment certification in agriculture. (a) Application filing requirements. (1) An...
20 CFR 655.1301 - Applications for temporary employment certification in agriculture.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 20 Employees' Benefits 3 2011-04-01 2011-04-01 false Applications for temporary employment certification in agriculture. 655.1301 Section 655.1301 Employees' Benefits EMPLOYMENT AND TRAINING... Applications for temporary employment certification in agriculture. (a) Application filing requirements. (1) An...
19 CFR 210.77 - Temporary emergency action.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 19 Customs Duties 3 2010-04-01 2010-04-01 false Temporary emergency action. 210.77 Section 210.77 Customs Duties UNITED STATES INTERNATIONAL TRADE COMMISSION INVESTIGATIONS OF UNFAIR PRACTICES IN IMPORT TRADE ADJUDICATION AND ENFORCEMENT Enforcement Procedures and Advisory Opinions § 210.77 Temporary...
47 CFR 101.125 - Temporary fixed antenna height restrictions.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 47 Telecommunication 5 2014-10-01 2014-10-01 false Temporary fixed antenna height restrictions... SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Technical Standards § 101.125 Temporary fixed antenna height restrictions. The overall antenna structure heights employed by mobile stations in the Local...
47 CFR 101.125 - Temporary fixed antenna height restrictions.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 5 2011-10-01 2011-10-01 false Temporary fixed antenna height restrictions... SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Technical Standards § 101.125 Temporary fixed antenna height restrictions. The overall antenna structure heights employed by mobile stations in the Local...
47 CFR 101.125 - Temporary fixed antenna height restrictions.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 47 Telecommunication 5 2012-10-01 2012-10-01 false Temporary fixed antenna height restrictions... SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Technical Standards § 101.125 Temporary fixed antenna height restrictions. The overall antenna structure heights employed by mobile stations in the Local...
47 CFR 101.125 - Temporary fixed antenna height restrictions.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 5 2010-10-01 2010-10-01 false Temporary fixed antenna height restrictions... SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Technical Standards § 101.125 Temporary fixed antenna height restrictions. The overall antenna structure heights employed by mobile stations in the Local...
47 CFR 101.125 - Temporary fixed antenna height restrictions.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 47 Telecommunication 5 2013-10-01 2013-10-01 false Temporary fixed antenna height restrictions... SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Technical Standards § 101.125 Temporary fixed antenna height restrictions. The overall antenna structure heights employed by mobile stations in the Local...
20 CFR 655.201 - Temporary labor certification applications.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Temporary labor certification applications... applications. (a)(1) An employer who anticipates a labor shortage of workers for agricultural or logging... an agent file, in duplicate, a temporary labor certification application, signed by the employer...
5 CFR 300.504 - Prohibition on employer-employee relationship
Code of Federal Regulations, 2010 CFR
2010-01-01
... REGULATIONS EMPLOYMENT (GENERAL) Use of Private Sector Temporaries § 300.504 Prohibition on employer-employee relationship No employer-employee relationship is created by an agency's use of private sector temporaries... appropriate procedures for interaction with private sector temporaries to assure that the supervisory...
26 CFR 1.7874-3T - Substantial business activities (temporary).
Code of Federal Regulations, 2013 CFR
2013-04-01
... 26 Internal Revenue 13 2013-04-01 2013-04-01 false Substantial business activities (temporary). 1... Substantial business activities (temporary). (a) Scope. This section provides rules regarding whether a foreign corporation has substantial business activities in the relevant foreign country when compared to...
12 CFR 303.45 - Special provisions.
Code of Federal Regulations, 2010 CFR
2010-01-01
... that an office be immediately relocated to a temporary location, applicants shall notify the... appropriate FDIC office, that identifies the nature of the emergency or disaster, specifies the location of the temporary branch, and provides an estimate of the duration the bank plans to operate the temporary...
47 CFR 101.815 - Stations at temporary fixed locations.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 47 Telecommunication 5 2012-10-01 2012-10-01 false Stations at temporary fixed locations. 101.815 Section 101.815 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Local Television Transmission Service § 101.815 Stations at temporary...
47 CFR 101.815 - Stations at temporary fixed locations.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 47 Telecommunication 5 2013-10-01 2013-10-01 false Stations at temporary fixed locations. 101.815 Section 101.815 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Local Television Transmission Service § 101.815 Stations at temporary...
47 CFR 101.815 - Stations at temporary fixed locations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 5 2010-10-01 2010-10-01 false Stations at temporary fixed locations. 101.815 Section 101.815 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Local Television Transmission Service § 101.815 Stations at temporary...
47 CFR 101.815 - Stations at temporary fixed locations.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 47 Telecommunication 5 2014-10-01 2014-10-01 false Stations at temporary fixed locations. 101.815 Section 101.815 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Local Television Transmission Service § 101.815 Stations at temporary...
47 CFR 101.815 - Stations at temporary fixed locations.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 5 2011-10-01 2011-10-01 false Stations at temporary fixed locations. 101.815 Section 101.815 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Local Television Transmission Service § 101.815 Stations at temporary...
Żołnierczyk-Zreda, Dorota
2015-01-01
From over 2 decades intensive research concerning temporary workers has been carried out in Europe and outside Europe. Despite having the highest rate of temporary workers in Europe, the studies on this topic are very rare in Poland. The aim of the study was to review the existing research on the relations between temporary work and employees' health and occupational functioning. The main conclusion from this review is that there is a significant inconsistency between the results of the studies included in this review due to such factors as heterogeneity of the group "temporary workers," cultural and generational differences between temporary workers, as well as different economic context in which those studies had been carried out. The main recommendations for the future research is thus to take into account the personal preferences for performing temporary work and to use more complex study design. This work is available in Open Access model and licensed under a CC BY-NC 3.0 PL license.
Zanardi, Piero Rocha; Laia Rocha Zanardi, Raquel; Chaib Stegun, Roberto; Sesma, Newton; Costa, Bru-No; Cruz Laganá, Dalva
2016-01-01
The digital smile design is a practical diagnosis method that can assist the clinician to visualize and measure dentogingival discrepancies. This clinical report aims to present the associated steps, from the diagnosis of the alterations diagnosis through to the final aesthetic result. A 37-years-old female patient presented as her main complaint the tooth form and colour discrepancies. Applying the digital smile design principle, the necessary measures for a harmonic smile correction could be accurately determined. The initial diagnosis led to a wax up of the master cast that was duplicated in acrylic resin directly in the mouth. This temporary restoration guided the periodontal surgery and the final pressed ceramic crown restoration. We conclude that the digital smile design concept seems to be a useful tool to achieve a satisfactory aesthetic result.
Concurrent Image Processing Executive (CIPE). Volume 3: User's guide
NASA Technical Reports Server (NTRS)
Lee, Meemong; Cooper, Gregory T.; Groom, Steven L.; Mazer, Alan S.; Williams, Winifred I.; Kong, Mih-Seh
1990-01-01
CIPE (the Concurrent Image Processing Executive) is both an executive which organizes the parameter inputs for hypercube applications and an environment which provides temporary data workspace and simple real-time function definition facilities for image analysis. CIPE provides two types of user interface. The Command Line Interface (CLI) provides a simple command-driven environment allowing interactive function definition and evaluation of algebraic expressions. The menu interface employs a hierarchical screen-oriented menu system where the user is led through a menu tree to any specific application and then given a formatted panel screen for parameter entry. How to initialize the system through the setup function, how to read data into CIPE symbols, how to manipulate and display data through the use of executive functions, and how to run an application in either user interface mode, are described.
Sánchez-Turrión, Andrés; López-Lozano, José F.; Albaladejo, Alberto; Torres-Lagares, Daniel; Montero, Javier; Suárez-García, Maria J.
2012-01-01
Objectives. This study aimed to evaluate the vertical discrepancy of implant-supported crown structures constructed with vacuum-casting and Direct Metal Laser Sintering (DMLS) technologies, and luted with different cement types. Study Design. Crown copings were fabricated using: (1) direct metal laser sintered Co-Cr (LS); (2) vacuum-cast Co-Cr (CC); and (3) vacuum-cast Ti (CT). Frameworks were luted onto machined implant abutments under constant seating pressure. Each alloy group was randomly divided into 5 subgroups (n = 10 each) according to the cement system utilized: Subgroup 1 (KC) used resin-modified glass-ionomer Ketac Cem Plus; Subgroup 2 (PF) used Panavia F 2.0 dual-cure resin cement; Subgroup 3 (RXU) used RelyX Unicem 2 Automix self-adhesive dual-cure resin cement; Subgroup 4 (PIC) used acrylic/urethane-based temporary Premier Implant Cement; and Subgroup 5 (DT) used acrylic/urethane-based temporary DentoTemp cement. Vertical misfit was measured by scanning electron microscopy (SEM). Two-way ANOVA and Student-Newman-Keuls tests were run to investigate the effect of alloy/fabrication technique, and cement type on vertical misfit. The statistical significance was set at α = 0.05. Results. The alloy/manufacturing technique and the luting cement affected the vertical discrepancy (p < 0.001). For each cement type, LS samples exhibited the best fit (p < 0.01) whereas CC and CT frames were statistically similar. Within each alloy group, PF and RXU provided comparably greater discrepancies than KC, PIC, and DT, which showed no differences. Conclusions. Laser sintering may be an alternative to vacuum-casting of base metals to obtain passive-fitting implant-supported crown copings. The best marginal adaptation corresponded to laser sintered structures luted with glass-ionomer KC, or temporary PIC or DT cements. The highest discrepancies were recorded for Co-Cr and Ti cast frameworks bonded with PF or RXU resinous agents. All groups were within the clinically acceptable misfit range. Key words:Dental alloy, laser sintering, implant-supported prostheses, vertical discrepancy, vertical misfit. PMID:22322524
Combining band recovery data and Pollock's robust design to model temporary and permanent emigration
Lindberg, M.S.; Kendall, W.L.; Hines, J.E.; Anderson, M.G.
2001-01-01
Capture-recapture models are widely used to estimate demographic parameters of marked populations. Recently, this statistical theory has been extended to modeling dispersal of open populations. Multistate models can be used to estimate movement probabilities among subdivided populations if multiple sites are sampled. Frequently, however, sampling is limited to a single site. Models described by Burnham (1993, in Marked Individuals in the Study of Bird Populations, 199-213), which combined open population capture-recapture and band-recovery models, can be used to estimate permanent emigration when sampling is limited to a single population. Similarly, Kendall, Nichols, and Hines (1997, Ecology 51, 563-578) developed models to estimate temporary emigration under Pollock's (1982, Journal of Wildlife Management 46, 757-760) robust design. We describe a likelihood-based approach to simultaneously estimate temporary and permanent emigration when sampling is limited to a single population. We use a sampling design that combines the robust design and recoveries of individuals obtained immediately following each sampling period. We present a general form for our model where temporary emigration is a first-order Markov process, and we discuss more restrictive models. We illustrate these models with analysis of data on marked Canvasback ducks. Our analysis indicates that probability of permanent emigration for adult female Canvasbacks was 0.193 (SE = 0.082) and that birds that were present at the study area in year i - 1 had a higher probability of presence in year i than birds that were not present in year i - 1.
41 CFR 302-7.108 - What temporary storage expenses will be reimbursed?
Code of Federal Regulations, 2010 CFR
2010-07-01
... Travel Regulation System RELOCATION ALLOWANCES TRANSPORTATION AND STORAGE OF PROPERTY 7-TRANSPORTATION AND TEMPORARY STORAGE OF HOUSEHOLD GOODS AND PROFESSIONAL BOOKS, PAPERS, AND EQUIPMENT (PBP&E... 41 Public Contracts and Property Management 4 2010-07-01 2010-07-01 false What temporary storage...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-09
... Activities: Declaration of Ultimate Consignee That Articles Were Exported for Temporary Scientific or... That Articles Were Exported for Temporary Scientific or Educational Purposes. This is a proposed... forms of information. Title: Declaration of Ultimate Consignee That Articles Were Exported for Temporary...
41 CFR 302-7.8 - Is there a time limit for the temporary storage of an authorized HHG shipment?
Code of Federal Regulations, 2010 CFR
2010-07-01
... PROPERTY 7-TRANSPORTATION AND TEMPORARY STORAGE OF HOUSEHOLD GOODS AND PROFESSIONAL BOOKS, PAPERS, AND EQUIPMENT (PBP&E) General Rules § 302-7.8 Is there a time limit for the temporary storage of an authorized...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-20
... DEPARTMENT OF THE TREASURY Order Granting Temporary Exemptions From Certain Government Securities... temporary exemptions from certain Government Securities Act of 1986 provisions and regulations regarding transactions in credit default swaps that reference government securities. ICE Clear Credit LLC requested these...
36 CFR 13.166 - Temporary facilities.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 36 Parks, Forests, and Public Property 1 2010-07-01 2010-07-01 false Temporary facilities. 13.166... facilities. A temporary facility or structure directly and necessarily related to the taking of subsistence... facilities which shall be published annually in accordance with § 1.7 of this chapter. ...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-24
...; Temporary Marketing Permit Applications AGENCY: Food and Drug Administration, HHS. ACTION: Notice. SUMMARY... ``Temporary Marketing Permit Applications'' has been approved by the Office of Management and Budget (OMB... collection of information entitled ``Temporary Marketing Permit Applications'' to OMB for review and...
Critical appraisal of the Spanner™ prostatic stent in the treatment of prostatic obstruction
McKenzie, Patrick; Badlani, Gopal
2011-01-01
The Spanner™ stent was first used in patients to relieve bladder outlet obstruction (BOO), and has recently been used in patients following transurethral microwave thermotherapy and men unfit for surgical intervention. We review the current literature on the role of the Spanner stent in treating prostatic obstruction compared to previously reported cases involving the use of temporary stents. The Spanner stent has been found to be successful in treating patients with bladder outlet obstruction from benign prostatic hyperplasia and following high-energy transurethral microwave thermotherapy (TUMT). Patients with the Spanner stent had an increase in peak flow rate and a decrease in post void residual and International Prostate Symptom Scores. In patients treated with TUMT, quality of life measures indicate that the Spanner stent shows increased ease of bladder drainage, decreased leakage, and no adverse effect on daily activities. In patients unfit for surgery, however, there was increased retention and pain requiring stent removal in 63% of cases. The Spanner stent offers ease of insertion with a decrease in voiding symptoms in selected patients. Based on limited data, the Spanner stent has been recommended as a treatment option for men with BOO following TUMT. However, it is not a good treatment option for men unfit for surgery based on an increased incidence of urinary retention and dysuria. The Spanner stent is the only currently approved temporary stent and, based on a literature review, it does not offer significant advantage over previously used temporary stents. It is notable that most researchers have not evaluated the role of detrusor function on the outcomes. PMID:22915927
26. INTERIOR VIEW SHOWING ROW OF TIMBER SUPPORT TOWERS BUILT ...
26. INTERIOR VIEW SHOWING ROW OF TIMBER SUPPORT TOWERS BUILT AS TEMPORARY TRUSS REINFORCEMENT (NOTE STEEL STRUCTURES ATOP TIMBER BRACING) - Oakland Army Base, Transit Shed, East of Dunkirk Street & South of Burma Road, Oakland, Alameda County, CA
26 CFR 1.181-5T - Examples (temporary).
Code of Federal Regulations, 2011 CFR
2011-04-01
... commence principal photography for film ABC until year 2. In year 1, X reasonably expects, based on all of... complete, principal photography for film ABC. Most of the scenes that X films in year 2 are shot outside...
Installation of straw barriers and silt fences.
DOT National Transportation Integrated Search
1976-01-01
The most common types of temporary sediment control structures used by the Virginia Department of Highways and Transportation are straw barriers and silt fences. Based on observations made in Virginia and other parts of the nation, filter barriers ha...
Code of Federal Regulations, 2011 CFR
2011-01-01
... economic, diplomatic, cultural, and security fields based on the Strategic Framework Agreement; (b) assist... appropriations, and consistent with Presidential guidance. (b) Nothing in this order shall be construed to impair...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-17
... Eagle Railroad Company--Temporary Trackage Rights Exemption--Norfolk Southern Railway Company Norfolk Southern Railway Company (NSR), pursuant to a written trackage rights agreement dated April 13, 2010, has agreed to grant nonexclusive overhead temporary trackage rights to Nittany & Bald Eagle Railroad Company...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-28
... Eagle Railroad Company--Temporary Trackage Rights Exemption--Norfolk Southern Railway Company Norfolk Southern Railway Company (NSR), pursuant to a written trackage rights agreement dated February 3, 2012, has agreed to grant nonexclusive overhead temporary trackage rights to Nittany & Bald Eagle Railroad Company...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-23
... Railroad, LLC--Temporary Trackage Rights Exemption--Norfolk Southern Railway Company Norfolk Southern Railway Company (NSR), pursuant to a written trackage rights agreement (Agreement), has agreed to grant overhead temporary trackage rights to Indiana Southern Railroad, LLC (ISRR) over NSR's line of railroad...
75 FR 3523 - Union Pacific Railroad Company-Temporary Trackage Rights Exemption-BNSF Railway Company
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-21
... Pacific Railroad Company--Temporary Trackage Rights Exemption--BNSF Railway Company Pursuant to a written trackage rights agreement dated December 22, 2009, BNSF Railway Company (BNSF) has agreed to grant temporary nonexclusive overhead trackage rights to Union Pacific Railroad Company (UP) over BNSF lines...
26 CFR 301.7701-2T - Business entities; definitions (temporary).
Code of Federal Regulations, 2010 CFR
2010-04-01
... 26 Internal Revenue 18 2010-04-01 2010-04-01 false Business entities; definitions (temporary). 301... (CONTINUED) PROCEDURE AND ADMINISTRATION PROCEDURE AND ADMINISTRATION Definitions § 301.7701-2T Business entities; definitions (temporary). (a) through (c)(2)(ii) [Reserved] For further guidance, see § 301.7701-2...
46 CFR 107.223 - Temporary Certificate of Inspection: Period in effect.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Temporary Certificate of Inspection: Period in effect. 107.223 Section 107.223 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS INSPECTION AND CERTIFICATION Inspection and Certification § 107.223 Temporary...
46 CFR 107.223 - Temporary Certificate of Inspection: Period in effect.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Temporary Certificate of Inspection: Period in effect. 107.223 Section 107.223 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS INSPECTION AND CERTIFICATION Inspection and Certification § 107.223 Temporary...
46 CFR 107.223 - Temporary Certificate of Inspection: Period in effect.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Temporary Certificate of Inspection: Period in effect. 107.223 Section 107.223 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS INSPECTION AND CERTIFICATION Inspection and Certification § 107.223 Temporary...
46 CFR 107.223 - Temporary Certificate of Inspection: Period in effect.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Temporary Certificate of Inspection: Period in effect. 107.223 Section 107.223 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS INSPECTION AND CERTIFICATION Inspection and Certification § 107.223 Temporary...
46 CFR 107.223 - Temporary Certificate of Inspection: Period in effect.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Temporary Certificate of Inspection: Period in effect. 107.223 Section 107.223 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS INSPECTION AND CERTIFICATION Inspection and Certification § 107.223 Temporary...
26 CFR 1.7874-2T - Surrogate foreign corporation (temporary).
Code of Federal Regulations, 2010 CFR
2010-04-01
... 26 Internal Revenue 13 2010-04-01 2010-04-01 false Surrogate foreign corporation (temporary). 1... (CONTINUED) INCOME TAX (CONTINUED) INCOME TAXES General Actuarial Valuations § 1.7874-2T Surrogate foreign corporation (temporary). (a) Scope. This section provides rules for determining whether a foreign corporation...
75 FR 20859 - Temporary Concession Contract for Blue Ridge Parkway, NC/VA
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-21
... DEPARTMENT OF THE INTERIOR National Park Service Temporary Concession Contract for Blue Ridge... of temporary concession contract for Blue Ridge Parkway. SUMMARY: Pursuant to 36 CFR 51.24, public... for the conduct of certain visitor services within Blue Ridge Parkway, North Carolina and Virginia for...
17 CFR 256.136 - Temporary cash investments.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 17 Commodity and Securities Exchanges 3 2010-04-01 2010-04-01 false Temporary cash investments... UTILITY HOLDING COMPANY ACT OF 1935 3. Current and Accrued Assets § 256.136 Temporary cash investments. This account shall include the cost of investments, such as demand and time loans, bankers' acceptances...
26 CFR 1.7874-2T - Surrogate foreign corporation (temporary).
Code of Federal Regulations, 2012 CFR
2012-04-01
... 26 Internal Revenue 13 2012-04-01 2012-04-01 false Surrogate foreign corporation (temporary). 1... Surrogate foreign corporation (temporary). (a) Scope. This section provides rules for determining whether a foreign corporation shall be treated as a surrogate foreign corporation under section 7874(a)(2)(B...
26 CFR 1.7874-2T - Surrogate foreign corporation (temporary).
Code of Federal Regulations, 2011 CFR
2011-04-01
... 26 Internal Revenue 13 2011-04-01 2011-04-01 false Surrogate foreign corporation (temporary). 1... Surrogate foreign corporation (temporary). (a) Scope. This section provides rules for determining whether a foreign corporation shall be treated as a surrogate foreign corporation under section 7874(a)(2)(B...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-08
... (FHFA) is issuing and seeking comment on a proposed rule to effect a provision of the Federal Housing... imposing a temporary increase, for rescinding such an increase and a time frame for review of such an... longer justify the temporary level.\\8\\ To effect the higher temporary minimum capital level, the Director...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-28
..., GA; Application for Temporary/ Interim Manufacturing Authority; Makita Corporation of America; (Hand- Held Power Tool and Gasoline/Electric-Powered Garden Product Manufacturing); Buford, GA An application... Georgia Foreign-Trade Zone, Inc., grantee of FTZ 26, requesting temporary/interim manufacturing (T/IM...
17 CFR 256.136 - Temporary cash investments.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 17 Commodity and Securities Exchanges 3 2011-04-01 2011-04-01 false Temporary cash investments... UTILITY HOLDING COMPANY ACT OF 1935 3. Current and Accrued Assets § 256.136 Temporary cash investments. This account shall include the cost of investments, such as demand and time loans, bankers' acceptances...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-18
... Activities: Declaration of the Ultimate Consignee That Articles Were Exported for Temporary Scientific or... the Declaration of the Ultimate Consignee that Articles were Exported for Temporary Scientific or...: Title: Declaration of the Ultimate Consignee that Articles were Exported for Temporary Scientific or...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-17
... DEPARTMENT OF TRANSPORTATION Surface Transportation Board [Docket No. FD 35510] Alabama Southern Railroad, L.L.C.--Temporary Trackage Rights Exemption--Norfolk Southern Railway Company Norfolk Southern... grant nonexclusive overhead temporary trackage rights to Alabama Southern Railroad, L.L.C. (ABS) over a...
26 CFR 301.7701-2T - Business entities; definitions (temporary).
Code of Federal Regulations, 2011 CFR
2011-04-01
... 26 Internal Revenue 18 2011-04-01 2011-04-01 false Business entities; definitions (temporary). 301... entities; definitions (temporary). (a) through (c)(2)(ii) [Reserved] For further guidance, see § 301.7701-2(a) through (c)(2)(ii). (iii) Tax liabilities of certain disregarded entities—(A) In general. An...
77 FR 25075 - Special Local Regulation; Galveston Bay, Kemah, TX
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-27
...-AA08 Special Local Regulation; Galveston Bay, Kemah, TX AGENCY: Coast Guard, DHS. ACTION: Temporary final rule. SUMMARY: The Coast Guard is establishing a temporary special local regulation in Galveston Bay in the vicinity of Kemah, Texas. This temporary special local regulation is necessary to provide...
22 CFR 123.5 - Temporary export licenses.
Code of Federal Regulations, 2011 CFR
2011-04-01
... DEFENSE ARTICLES § 123.5 Temporary export licenses. (a) The Directorate of Defense Trade Controls may issue a license for the temporary export of unclassified defense articles (DSP-73). Such licenses are... license or other written approval must be obtained from the Directorate of Defense Trade Controls if the...
22 CFR 123.5 - Temporary export licenses.
Code of Federal Regulations, 2013 CFR
2013-04-01
... DEFENSE ARTICLES § 123.5 Temporary export licenses. (a) The Directorate of Defense Trade Controls may issue a license for the temporary export of unclassified defense articles (DSP-73). Such licenses are... license or other written approval must be obtained from the Directorate of Defense Trade Controls if the...
8 CFR 1244.5 - Temporary treatment benefits for eligible aliens.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 8 Aliens and Nationality 1 2012-01-01 2012-01-01 false Temporary treatment benefits for eligible aliens. 1244.5 Section 1244.5 Aliens and Nationality EXECUTIVE OFFICE FOR IMMIGRATION REVIEW, DEPARTMENT... § 1244.5 Temporary treatment benefits for eligible aliens. (a) Prior to the registration period. Prior to...
8 CFR 1244.5 - Temporary treatment benefits for eligible aliens.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 8 Aliens and Nationality 1 2014-01-01 2014-01-01 false Temporary treatment benefits for eligible aliens. 1244.5 Section 1244.5 Aliens and Nationality EXECUTIVE OFFICE FOR IMMIGRATION REVIEW, DEPARTMENT... § 1244.5 Temporary treatment benefits for eligible aliens. (a) Prior to the registration period. Prior to...
8 CFR 1244.5 - Temporary treatment benefits for eligible aliens.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 8 Aliens and Nationality 1 2011-01-01 2011-01-01 false Temporary treatment benefits for eligible aliens. 1244.5 Section 1244.5 Aliens and Nationality EXECUTIVE OFFICE FOR IMMIGRATION REVIEW, DEPARTMENT... § 1244.5 Temporary treatment benefits for eligible aliens. (a) Prior to the registration period. Prior to...
8 CFR 1244.5 - Temporary treatment benefits for eligible aliens.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 8 Aliens and Nationality 1 2010-01-01 2010-01-01 false Temporary treatment benefits for eligible aliens. 1244.5 Section 1244.5 Aliens and Nationality EXECUTIVE OFFICE FOR IMMIGRATION REVIEW, DEPARTMENT... § 1244.5 Temporary treatment benefits for eligible aliens. (a) Prior to the registration period. Prior to...
8 CFR 1244.5 - Temporary treatment benefits for eligible aliens.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 8 Aliens and Nationality 1 2013-01-01 2013-01-01 false Temporary treatment benefits for eligible aliens. 1244.5 Section 1244.5 Aliens and Nationality EXECUTIVE OFFICE FOR IMMIGRATION REVIEW, DEPARTMENT... § 1244.5 Temporary treatment benefits for eligible aliens. (a) Prior to the registration period. Prior to...
36 CFR 1226.26 - How do agencies donate temporary records?
Code of Federal Regulations, 2010 CFR
2010-07-01
... Administration, Modern Records Programs (NWM), 8601 Adelphi Road, College Park, MD 20740-6001, phone number (301... temporary records? 1226.26 Section 1226.26 Parks, Forests, and Public Property NATIONAL ARCHIVES AND RECORDS ADMINISTRATION RECORDS MANAGEMENT IMPLEMENTING DISPOSITION § 1226.26 How do agencies donate temporary records? (a...
36 CFR 1226.26 - How do agencies donate temporary records?
Code of Federal Regulations, 2011 CFR
2011-07-01
... Administration, Modern Records Programs (NWM), 8601 Adelphi Road, College Park, MD 20740-6001, phone number (301... temporary records? 1226.26 Section 1226.26 Parks, Forests, and Public Property NATIONAL ARCHIVES AND RECORDS ADMINISTRATION RECORDS MANAGEMENT IMPLEMENTING DISPOSITION § 1226.26 How do agencies donate temporary records? (a...
36 CFR § 1226.26 - How do agencies donate temporary records?
Code of Federal Regulations, 2013 CFR
2013-07-01
... temporary records? § 1226.26 Section § 1226.26 Parks, Forests, and Public Property NATIONAL ARCHIVES AND RECORDS ADMINISTRATION RECORDS MANAGEMENT IMPLEMENTING DISPOSITION § 1226.26 How do agencies donate temporary records? (a) Agencies must obtain written approval from NARA before donating records eligible for...
36 CFR 1226.26 - How do agencies donate temporary records?
Code of Federal Regulations, 2014 CFR
2014-07-01
... Administration, Modern Records Programs (NWM), 8601 Adelphi Road, College Park, MD 20740-6001, phone number (301... temporary records? 1226.26 Section 1226.26 Parks, Forests, and Public Property NATIONAL ARCHIVES AND RECORDS ADMINISTRATION RECORDS MANAGEMENT IMPLEMENTING DISPOSITION § 1226.26 How do agencies donate temporary records? (a...
36 CFR 1226.26 - How do agencies donate temporary records?
Code of Federal Regulations, 2012 CFR
2012-07-01
... Administration, Modern Records Programs (NWM), 8601 Adelphi Road, College Park, MD 20740-6001, phone number (301... temporary records? 1226.26 Section 1226.26 Parks, Forests, and Public Property NATIONAL ARCHIVES AND RECORDS ADMINISTRATION RECORDS MANAGEMENT IMPLEMENTING DISPOSITION § 1226.26 How do agencies donate temporary records? (a...
27 CFR 4.92 - Alternative names permitted for temporary use.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 27 Alcohol, Tobacco Products and Firearms 1 2010-04-01 2010-04-01 false Alternative names permitted for temporary use. 4.92 Section 4.92 Alcohol, Tobacco Products and Firearms ALCOHOL AND TOBACCO... Grape Variety Names § 4.92 Alternative names permitted for temporary use. The following alternative...
19 CFR 210.66 - Initial determination concerning temporary relief; Commission action thereon.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 19 Customs Duties 3 2010-04-01 2010-04-01 false Initial determination concerning temporary relief; Commission action thereon. 210.66 Section 210.66 Customs Duties UNITED STATES INTERNATIONAL TRADE COMMISSION INVESTIGATIONS OF UNFAIR PRACTICES IN IMPORT TRADE ADJUDICATION AND ENFORCEMENT Temporary Relief § 210.66 Initial...
19 CFR 210.69 - Approval of complainant's temporary relief bond.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 19 Customs Duties 3 2010-04-01 2010-04-01 false Approval of complainant's temporary relief bond. 210.69 Section 210.69 Customs Duties UNITED STATES INTERNATIONAL TRADE COMMISSION INVESTIGATIONS OF UNFAIR PRACTICES IN IMPORT TRADE ADJUDICATION AND ENFORCEMENT Temporary Relief § 210.69 Approval of...
33 CFR 211.5 - Temporary use; how granted.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Section 211.5 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE REAL ESTATE ACTIVITIES OF THE CORPS OF ENGINEERS IN CONNECTION WITH CIVIL WORKS PROJECTS Temporary Use by Others of Civil Works Real Estate § 211.5 Temporary use; how granted. There are three methods...
26 CFR 1.41-8T - Alternative incremental credit (temporary).
Code of Federal Regulations, 2010 CFR
2010-04-01
... 26 Internal Revenue 1 2010-04-01 2010-04-01 true Alternative incremental credit (temporary). 1.41... INCOME TAXES Credits Against Tax § 1.41-8T Alternative incremental credit (temporary). (a) [Reserved] For... alternative simplified credit (ASC) and attaches the completed form to the taxpayer's timely filed (including...
20 CFR 655.1310 - Validity and scope of temporary labor certifications.
Code of Federal Regulations, 2010 CFR
2010-04-01
... OF LABOR TEMPORARY EMPLOYMENT OF FOREIGN WORKERS IN THE UNITED STATES Labor Certification Process for Temporary Agricultural Employment in the United States (H-2A Workers) § 655.1310 Validity and scope of... workers, the area of intended employment, the specific occupation and duties, and the employer(s...
49 CFR 37.15 - Temporary suspension of certain detectable warning requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 1 2010-10-01 2010-10-01 false Temporary suspension of certain detectable warning requirements. 37.15 Section 37.15 Transportation Office of the Secretary of Transportation TRANSPORTATION SERVICES FOR INDIVIDUALS WITH DISABILITIES (ADA) General § 37.15 Temporary suspension of certain detectable...
17 CFR 201.510 - Temporary cease-and-desist orders: Application process.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 17 Commodity and Securities Exchanges 2 2011-04-01 2011-04-01 false Temporary cease-and-desist orders: Application process. 201.510 Section 201.510 Commodity and Securities Exchanges SECURITIES AND... § 201.510 Temporary cease-and-desist orders: Application process. (a) Procedure. A request for entry of...
17 CFR 201.510 - Temporary cease-and-desist orders: Application process.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 17 Commodity and Securities Exchanges 2 2012-04-01 2012-04-01 false Temporary cease-and-desist orders: Application process. 201.510 Section 201.510 Commodity and Securities Exchanges SECURITIES AND... § 201.510 Temporary cease-and-desist orders: Application process. (a) Procedure. A request for entry of...
17 CFR 201.510 - Temporary cease-and-desist orders: Application process.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 17 Commodity and Securities Exchanges 2 2013-04-01 2013-04-01 false Temporary cease-and-desist orders: Application process. 201.510 Section 201.510 Commodity and Securities Exchanges SECURITIES AND... § 201.510 Temporary cease-and-desist orders: Application process. (a) Procedure. A request for entry of...
22 CFR 126.2 - Temporary suspension or modification of this subchapter.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Temporary suspension or modification of this subchapter. 126.2 Section 126.2 Foreign Relations DEPARTMENT OF STATE INTERNATIONAL TRAFFIC IN ARMS REGULATIONS GENERAL POLICIES AND PROVISIONS § 126.2 Temporary suspension or modification of this subchapter...
22 CFR 126.2 - Temporary suspension or modification of this subchapter.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 22 Foreign Relations 1 2011-04-01 2011-04-01 false Temporary suspension or modification of this subchapter. 126.2 Section 126.2 Foreign Relations DEPARTMENT OF STATE INTERNATIONAL TRAFFIC IN ARMS REGULATIONS GENERAL POLICIES AND PROVISIONS § 126.2 Temporary suspension or modification of this subchapter...
22 CFR 126.2 - Temporary suspension or modification of this subchapter.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 22 Foreign Relations 1 2012-04-01 2012-04-01 false Temporary suspension or modification of this subchapter. 126.2 Section 126.2 Foreign Relations DEPARTMENT OF STATE INTERNATIONAL TRAFFIC IN ARMS REGULATIONS GENERAL POLICIES AND PROVISIONS § 126.2 Temporary suspension or modification of this subchapter...
22 CFR 126.2 - Temporary suspension or modification of this subchapter.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 22 Foreign Relations 1 2013-04-01 2013-04-01 false Temporary suspension or modification of this subchapter. 126.2 Section 126.2 Foreign Relations DEPARTMENT OF STATE INTERNATIONAL TRAFFIC IN ARMS REGULATIONS GENERAL POLICIES AND PROVISIONS § 126.2 Temporary suspension or modification of this subchapter...
19 CFR 210.68 - Complainant's temporary relief bond.
Code of Federal Regulations, 2010 CFR
2010-04-01
... bond is being posted, the amount of the bond, the effective date and duration of the bond (as... 19 Customs Duties 3 2010-04-01 2010-04-01 false Complainant's temporary relief bond. 210.68... relief bond. (a) In every investigation under this part involving a motion for temporary relief, the...
47 CFR 25.277 - Temporary fixed earth station operations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 2 2010-10-01 2010-10-01 false Temporary fixed earth station operations. 25... SERVICES SATELLITE COMMUNICATIONS Technical Operations § 25.277 Temporary fixed earth station operations. (a) When an earth station in the Fixed-Satellite Service is to remain at a single location for fewer...
47 CFR 25.277 - Temporary fixed earth station operations.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 47 Telecommunication 2 2013-10-01 2013-10-01 false Temporary fixed earth station operations. 25... SERVICES SATELLITE COMMUNICATIONS Technical Operations § 25.277 Temporary fixed earth station operations. (a) When an earth station in the Fixed-Satellite Service is to remain at a single location for fewer...
47 CFR 25.277 - Temporary fixed earth station operations.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 47 Telecommunication 2 2012-10-01 2012-10-01 false Temporary fixed earth station operations. 25... SERVICES SATELLITE COMMUNICATIONS Technical Operations § 25.277 Temporary fixed earth station operations. (a) When an earth station in the Fixed-Satellite Service is to remain at a single location for fewer...
47 CFR 25.277 - Temporary fixed earth station operations.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 47 Telecommunication 2 2014-10-01 2014-10-01 false Temporary fixed earth station operations. 25... SERVICES SATELLITE COMMUNICATIONS Technical Operations § 25.277 Temporary fixed earth station operations. (a) When an earth station in the Fixed-Satellite Service is to remain at a single location for fewer...
47 CFR 25.277 - Temporary fixed earth station operations.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 2 2011-10-01 2011-10-01 false Temporary fixed earth station operations. 25... SERVICES SATELLITE COMMUNICATIONS Technical Operations § 25.277 Temporary fixed earth station operations. (a) When an earth station in the Fixed-Satellite Service is to remain at a single location for fewer...
38 CFR 21.6001 - Temporary vocational training program for certain pension recipients.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 38 Pensions, Bonuses, and Veterans' Relief 2 2010-07-01 2010-07-01 false Temporary vocational training program for certain pension recipients. 21.6001 Section 21.6001 Pensions, Bonuses, and Veterans... Program of Vocational Training for Certain New Pension Recipients General § 21.6001 Temporary vocational...
40 CFR 310.10 - What are temporary emergency measures?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 27 2010-07-01 2010-07-01 false What are temporary emergency measures... RESPONSE TO HAZARDOUS SUBSTANCE RELEASES Provisions What Can Be Reimbursed? § 310.10 What are temporary... security; (2) Controlling the source of contamination; (3) Containing the release to prevent spreading; (4...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-25
... Benefits (FEHB) Enrollment for Spouse Equity/Temporary Continuation of Coverage (TCC) Enrollees/Direct Pay.../Temporary Continuation of Coverage (TCC) Enrollees/ Direct Pay Annuitants. As required by the Paperwork... Equity/Temporary Continuation of Coverage (TCC) Enrollees/Direct Pay Annuitants is used by former spouses...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-22
... DEPARTMENT OF HOMELAND SECURITY U.S. Citizenship and Immigration Services [OMB Control Number 1615-0043] Agency Information Collection Activities: Application for Temporary Protected Status, Form I-821... Currently Approved Collection. (2) Title of the Form/Collection: Application for Temporary Protected Status...
76 FR 80733 - Extension of Temporary Registration of Municipal Advisors
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-27
... SECURITIES AND EXCHANGE COMMISSION 17 CFR Part 240 [Release No. 34-66020; File No. S7-19-10] RIN 3235-AK69 Extension of Temporary Registration of Municipal Advisors AGENCY: Securities and Exchange Commission. ACTION: Interim final temporary rule; extension. SUMMARY: The Securities and Exchange Commission...
18 CFR 1304.409 - Indefinite or temporary moorage of recreational vessels.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Indefinite or temporary... TENNESSEE VALLEY AUTHORITY APPROVAL OF CONSTRUCTION IN THE TENNESSEE RIVER SYSTEM AND REGULATION OF STRUCTURES AND OTHER ALTERATIONS Miscellaneous § 1304.409 Indefinite or temporary moorage of recreational...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-31
... Company--Temporary Trackage Rights Exemption--Union Pacific Railroad Company Union Pacific Railroad Company (UP), pursuant to a written trackage rights agreement dated May 16, 2013, has agreed to grant temporary overhead trackage rights to BNSF Railway Company (BNSF) over: (1) UP's Black Butte Subdivision...
26 CFR 1.469-3T - Passive activity credit (temporary).
Code of Federal Regulations, 2010 CFR
2010-04-01
... 26 Internal Revenue 6 2010-04-01 2010-04-01 false Passive activity credit (temporary). 1.469-3T... TAX (CONTINUED) INCOME TAXES Taxable Year for Which Deductions Taken § 1.469-3T Passive activity credit (temporary). (a) Computation of passive activity credit. The taxpayer's passive activity credit...
26 CFR 1.469-3T - Passive activity credit (temporary).
Code of Federal Regulations, 2011 CFR
2011-04-01
... 26 Internal Revenue 6 2011-04-01 2011-04-01 false Passive activity credit (temporary). 1.469-3T... TAX (CONTINUED) INCOME TAXES (CONTINUED) Taxable Year for Which Deductions Taken § 1.469-3T Passive activity credit (temporary). (a) Computation of passive activity credit. The taxpayer's passive activity...
Bonney, Tessa; Forst, Linda; Rivers, Samara; Love, Marsha; Pratap, Preethi; Bell, Tim; Fulkerson, Sean
2017-08-01
Workers in the temporary staffing industry face hazardous working conditions and have a high risk of occupational injury. This project brought together local workers' centers and university investigators to build a corps of Occupational Health Promoters (OHPs) and to test a survey tool and recruitment methods to identify hazards and raise awareness among workers employed by temporary staffing companies. OHPs interviewed ninety-eight workers employed by thirty-three temporary agencies and forty-nine client companies, working mainly in shipping and packing, manufacturing, and warehousing sectors. Surveys identified workplace hazards. OHPs reported two companies to OSHA, resulting in several citations. Partners reported greater understanding of occupational safety and health challenges for temporary workers and continue to engage in training, peer education, and coalition building.
A health system program to reduce work disability related to musculoskeletal disorders.
Abásolo, Lydia; Blanco, Margarita; Bachiller, Javier; Candelas, Gloria; Collado, Paz; Lajas, Cristina; Revenga, Marcelino; Ricci, Patricia; Lázaro, Pablo; Aguilar, Maria Dolores; Vargas, Emilio; Fernández-Gutiérrez, Benjamín; Hernández-García, César; Carmona, Loreto; Jover, Juan A
2005-09-20
Musculoskeletal disorders (MSDs) are a frequent cause of work disability, accounting for productivity losses in industrialized societies equivalent to 1.3% of the U.S. gross national product. To evaluate whether a population-based clinical program offered to patients with recent-onset work disability caused by MSDs is cost-effective. Randomized, controlled intervention study. The inclusion and follow-up periods each lasted 12 months. Three health districts in Madrid, Spain. All patients with MSD-related temporary work disability in 1998 and 1999. The control group received standard primary care management, with referral to specialized care if needed. The intervention group received a specific program, administered by rheumatologists, in which care was delivered during regular visits and included 3 main elements: education, protocol-based clinical management, and administrative duties. Efficacy variables were 1) days of temporary work disability and 2) number of patients with permanent work disability. All analyses were done on an intention-to-treat basis. 1,077 patients were included in the study, 7805 in the control group and 5272 in the intervention group, generating 16,297 episodes of MSD-related temporary work disability. These episodes were shorter in the intervention group than in the control group (mean, 26 days compared with 41 days; P < 0.001), and the groups had similar numbers of episodes per patient. Fewer patients received long-term disability compensation in the intervention group (n = 38 [0.7%]) than in the control group (n = 99 [1.3%]) (P < 0.005). Direct and indirect costs were lower in the intervention group than in the control group. To save 1 day of temporary work disability, 6.00 dollars had to be invested in the program. Each dollar invested generated a benefit of 11.00 dollars. The program's net benefit was in excess of 5 million dollars. The study was unblinded. Implementation of the program, offered to the general population, improves short- and long-term work disability outcomes and is cost-effective.
Estrade, Vanessa; Fayan, Jacques
2017-01-01
Photo-identification surveys of Indo-Pacific bottlenose dolphins were conducted from 2009 to 2014 off Reunion Island (55°E33’/21°S07’), in the Indian Ocean. Robust Design models were applied to produce the most reliable estimate of population abundance and survival rate, while accounting for temporary emigration from the survey area (west coast). The sampling scheme consisted of a five-month (June–October) sampling period in each year of the study. The overall population size at Reunion was estimated to be 72 individuals (SE = 6.17, 95%CI = 61–85), based on a random temporary emigration (γ”) of 0.096 and a proportion of 0.70 (SE = 0.03) distinct individuals. The annual survival rate was 0.93 (±0.018 SE, 95%CI = 0.886–0.958) and was constant over time and between sexes. Models considering gender groups indicated different movement patterns between males and females. Males showed null or quasi-null temporary emigration (γ” = γ’ < 0.01), while females showed a random temporary emigration (γ”) of 0.10, suggesting that a small proportion of females was outside the survey area during each primary sampling period. Sex-specific temporary migration patterns were consistent with movement and residency patterns observed in other areas. The Robust Design approach provided an appropriate sampling scheme for deriving island-associated population parameters, while allowing to restrict survey effort both spatially (i.e. west coast only) and temporally (five months per year). Although abundance and survival were stable over the six years, the small population size of fewer than 100 individuals suggested that this population is highly vulnerable. Priority should be given to reducing any potential impact of human activity on the population and its habitat. PMID:28640918
ERIC Educational Resources Information Center
Chu, Hui-Chun; Chang, Shao-Chen
2014-01-01
Although educational computer games have been recognized as being a promising approach, previous studies have indicated that, without supportive models, students might only show temporary interest during the game-based learning process, and their learning performance is often not as good as expected. Therefore, in this paper, a two-tier test…
Students in Foster Care: Individualized School-Based Supports for Successful Lives
ERIC Educational Resources Information Center
Neiheiser, Linda M.
2015-01-01
Foster care is a government-based, temporary system of support for children and adolescents whose biologic parents are either unwilling or unable to parent them. Variability exists with regard to the type of foster care continuity of services offered as well as to the placement homes themselves, and--of the nearly half-million youth currently…
26 CFR 1.132-8T - Nondiscrimination rules-1985 through 1988 (temporary).
Code of Federal Regulations, 2013 CFR
2013-04-01
... classification that is based on factors such as seniority, full-time vs. part-time employment, or job description... made available to employees each year) or because of the nature of the fringe benefit (such as where an...-same-terms requirement. Therefore, an allocation based on seniority, full-time vs. part-time employment...
26 CFR 1.132-8T - Nondiscrimination rules-1985 through 1988 (temporary).
Code of Federal Regulations, 2012 CFR
2012-04-01
... classification that is based on factors such as seniority, full-time vs. part-time employment, or job description... made available to employees each year) or because of the nature of the fringe benefit (such as where an...-same-terms requirement. Therefore, an allocation based on seniority, full-time vs. part-time employment...
26 CFR 1.132-8T - Nondiscrimination rules-1985 through 1988 (temporary).
Code of Federal Regulations, 2011 CFR
2011-04-01
... classification that is based on factors such as seniority, full-time vs. part-time employment, or job description... made available to employees each year) or because of the nature of the fringe benefit (such as where an...-same-terms requirement. Therefore, an allocation based on seniority, full-time vs. part-time employment...
26 CFR 1.132-8T - Nondiscrimination rules-1985 through 1988 (temporary).
Code of Federal Regulations, 2014 CFR
2014-04-01
... classification that is based on factors such as seniority, full-time vs. part-time employment, or job description... made available to employees each year) or because of the nature of the fringe benefit (such as where an...-same-terms requirement. Therefore, an allocation based on seniority, full-time vs. part-time employment...
7. Credit PSR. Detail view looks east at Building 4306 ...
7. Credit PSR. Detail view looks east at Building 4306 (Boiler House) and at the south facade of Building 4305. Ground disturbance in foreground was a pit lined with plastic film for placement of a temporary fuel tank. - Edwards Air Force Base, North Base, Unicon Portable Hangar, First & C Streets, Boron, Kern County, CA
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-13
... emission controls rather than to changes in meteorology, economic conditions, temporary, or voluntary (not... observed improvement in air quality is due to an economic recession, changes in meteorology, or temporary... improvement is due to the economic downturn, temporary changes in meteorology, or voluntary emission...
Temporary Employment Contracts in Academia: A Real Option View
ERIC Educational Resources Information Center
Brady, Malcolm
2017-01-01
This paper examines the strategic use of temporary employment contracts in dealing with supply uncertainty in the form of employee ability that is slow to reveal itself, for example in academia where there exist significant time lags in demonstration of research ability. A temporary contract is modeled as a real option, specifically as a…
26 CFR 1.846-4T - Effective dates (temporary).
Code of Federal Regulations, 2010 CFR
2010-04-01
... 26 Internal Revenue 8 2010-04-01 2010-04-01 false Effective dates (temporary). 1.846-4T Section 1.846-4T Internal Revenue INTERNAL REVENUE SERVICE, DEPARTMENT OF THE TREASURY (CONTINUED) INCOME TAX (CONTINUED) INCOME TAXES Other Insurance Companies § 1.846-4T Effective dates (temporary). (a) [Reserved...
41 CFR 302-7.100 - How are the charges of transporting HHG, and temporary storage calculated?
Code of Federal Regulations, 2010 CFR
2010-07-01
... transporting HHG, and temporary storage calculated? 302-7.100 Section 302-7.100 Public Contracts and Property Management Federal Travel Regulation System RELOCATION ALLOWANCES TRANSPORTATION AND STORAGE OF PROPERTY 7-TRANSPORTATION AND TEMPORARY STORAGE OF HOUSEHOLD GOODS AND PROFESSIONAL BOOKS, PAPERS, AND EQUIPMENT (PBP&E...
Code of Federal Regulations, 2010 CFR
2010-07-01
... Federal Travel Regulation System RELOCATION ALLOWANCES TRANSPORTATION AND STORAGE OF PROPERTY 7-TRANSPORTATION AND TEMPORARY STORAGE OF HOUSEHOLD GOODS AND PROFESSIONAL BOOKS, PAPERS, AND EQUIPMENT (PBP&E... allowance for HHG and temporary storage limited when quarters are furnished or partly furnished by the...
75 FR 22611 - Recovery Policy RP9523.3, Provision of Temporary Relocation Facilities
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-29
...] Recovery Policy RP9523.3, Provision of Temporary Relocation Facilities AGENCY: Federal Emergency Management... Management Agency (FEMA) is accepting comments on Recovery Policy RP9523.3, Provision of Temporary Relocation... major disaster. Specifically, Section 403(a)(3)(D) of the Stafford Act allows for the provision of...
41 CFR 102-117.295 - Who makes the decisions on temporary nonuse, suspension and debarment?
Code of Federal Regulations, 2010 CFR
2010-07-01
... nature of suspension and debarment requires that these sanctions be imposed only in the public interest... on temporary nonuse, suspension and debarment? 102-117.295 Section 102-117.295 Public Contracts and... § 102-117.295 Who makes the decisions on temporary nonuse, suspension and debarment? (a) The...
Temporary and Travelling Exhibitions. Museums and Monuments, X.
ERIC Educational Resources Information Center
Daifuku, Hiroshi; And Others
The permanent exhibition, the most typical form of museum exhibition, has failed to attract repeated visitation, since visitors quickly become familiar with the objects shown. The temporary exhibition evolved as a result for the need of repeated visitation. The temporary exhibition, set up for a period of one to six months, introduces fresh…
22 CFR 123.1 - Requirement for export or temporary import licenses.
Code of Federal Regulations, 2014 CFR
2014-04-01
... licenses. 123.1 Section 123.1 Foreign Relations DEPARTMENT OF STATE INTERNATIONAL TRAFFIC IN ARMS REGULATIONS LICENSES FOR THE EXPORT AND TEMPORARY IMPORT OF DEFENSE ARTICLES § 123.1 Requirement for export or temporary import licenses. (a) Any person who intends to export or to import temporarily a defense article...
26 CFR 1.709-1T - Treatment of organizational expenses and syndication costs (temporary).
Code of Federal Regulations, 2010 CFR
2010-04-01
... syndication costs (temporary). 1.709-1T Section 1.709-1T Internal Revenue INTERNAL REVENUE SERVICE, DEPARTMENT... Treatment of organizational expenses and syndication costs (temporary). (a) [Reserved] For further guidance... organizational expenses for two or more taxable years. (3) Liquidation of partnership. If there is a winding up...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-20
...--Indianapolis, IN; Application for Temporary/Interim Manufacturing Authority; Brevini Wind USA, Inc. (Wind... temporary/interim manufacturing (T/IM) authority within FTZ 72 at the Brevini Wind USA, Inc. (Brevini... requested authority to produce wind turbine gear boxes (HTSUS 8483.40, duty rate: 2.5%). Foreign components...
ERIC Educational Resources Information Center
Vosko, Leah F.
2008-01-01
This article explores the transnational regulation of temporary work. Analyzing the terms of the EU "Directive on Fixed-Term Work (1999), the ILO "Convention on Private Employment Agencies" (1997), the ILO "Recommendation on the Employment Relationship" (2006), and a draft EU Directive on "Temporary Agency Work"…
26 CFR 1.41-6T - Aggregation of expenditures (temporary).
Code of Federal Regulations, 2010 CFR
2010-04-01
... 26 Internal Revenue 1 2010-04-01 2010-04-01 true Aggregation of expenditures (temporary). 1.41-6T Section 1.41-6T Internal Revenue INTERNAL REVENUE SERVICE, DEPARTMENT OF THE TREASURY INCOME TAX INCOME TAXES Credits Against Tax § 1.41-6T Aggregation of expenditures (temporary). (a) [Reserved] For further...
Just a Temp: Experience and Structure of Alienation in Temporary Clerical Employment.
ERIC Educational Resources Information Center
Rogers, Jackie Krasas
1995-01-01
Interviews with 13 women who had worked in temporary clerical positions identified ways in which they are alienated from work, from others, and from themselves; the ways they actively resist alienation; and constraints on resistance. Results revealed a concern that temporary workers are disproportionately those already marginalized, such as women…
78 FR 15279 - Airworthiness Directives; Airbus Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-11
... altimeter with engaged flare and retard mode, in case of go-around, might lead to a temporary loss of... flare and retard mode, in case of go-around, the situation may lead to a temporary loss of aeroplane... and retard mode, in case of go-around, might lead to a temporary loss of airplane longitudinal control...
26 CFR 1.892-3T - Income of foreign governments (temporary regulations).
Code of Federal Regulations, 2013 CFR
2013-04-01
... functional currency) or in precious metals when held by a foreign government or central bank of issue (as... 26 Internal Revenue 9 2013-04-01 2013-04-01 false Income of foreign governments (temporary... foreign governments (temporary regulations). (a) Types of income exempt—(1) In general. Subject to the...
26 CFR 1.892-3T - Income of foreign governments (temporary regulations).
Code of Federal Regulations, 2014 CFR
2014-04-01
... functional currency) or in precious metals when held by a foreign government or central bank of issue (as... 26 Internal Revenue 9 2014-04-01 2014-04-01 false Income of foreign governments (temporary... foreign governments (temporary regulations). (a) Types of income exempt—(1) In general. Subject to the...
26 CFR 1.892-3T - Income of foreign governments (temporary regulations).
Code of Federal Regulations, 2012 CFR
2012-04-01
... functional currency) or in precious metals when held by a foreign government or central bank of issue (as... 26 Internal Revenue 9 2012-04-01 2012-04-01 false Income of foreign governments (temporary... foreign governments (temporary regulations). (a) Types of income exempt—(1) In general. Subject to the...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-23
... DEPARTMENT OF LABOR Employment and Training Administration Information Collection Approval; Temporary Non-Agricultural Employment of H-2B Aliens in the United States AGENCY: Employment and Training... the Temporary Non-Agricultural Employment of H-2B Aliens in the United States; Final Rule. See 77 FR...
26 CFR 1.883-0T - Outline of major topics (temporary).
Code of Federal Regulations, 2010 CFR
2010-04-01
... TAX (CONTINUED) INCOME TAXES Foreign Corporations § 1.883-0T Outline of major topics (temporary). This... income from the international operation of ships or aircraft (temporary). (a) through (c)(3)(i) [Reserved...) Special rules with respect to income tax conventions. (i) Countries with only an income tax convention...
30 CFR 816.14 - Casing and sealing of drilled holes: Temporary.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 30 Mineral Resources 3 2013-07-01 2013-07-01 false Casing and sealing of drilled holes: Temporary...-SURFACE MINING ACTIVITIES § 816.14 Casing and sealing of drilled holes: Temporary. Each exploration hole, other drill or boreholes, wells and other exposed underground openings which have been identified in the...
30 CFR 816.14 - Casing and sealing of drilled holes: Temporary.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 30 Mineral Resources 3 2012-07-01 2012-07-01 false Casing and sealing of drilled holes: Temporary...-SURFACE MINING ACTIVITIES § 816.14 Casing and sealing of drilled holes: Temporary. Each exploration hole, other drill or boreholes, wells and other exposed underground openings which have been identified in the...
30 CFR 816.14 - Casing and sealing of drilled holes: Temporary.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Casing and sealing of drilled holes: Temporary...-SURFACE MINING ACTIVITIES § 816.14 Casing and sealing of drilled holes: Temporary. Each exploration hole, other drill or boreholes, wells and other exposed underground openings which have been identified in the...
30 CFR 816.14 - Casing and sealing of drilled holes: Temporary.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 30 Mineral Resources 3 2014-07-01 2014-07-01 false Casing and sealing of drilled holes: Temporary...-SURFACE MINING ACTIVITIES § 816.14 Casing and sealing of drilled holes: Temporary. Each exploration hole, other drill or boreholes, wells and other exposed underground openings which have been identified in the...
77 FR 76854 - Temporary Rule Regarding Principal Trades With Certain Advisory Clients
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-31
... 3235-AL28 Temporary Rule Regarding Principal Trades With Certain Advisory Clients AGENCY: Securities... transactions with certain of their advisory clients. The amendment extends the date on which rule 206(3)- 3T... releases used RIN 3235-AJ96. (See Temporary Rule Regarding Principal Trades with Certain Advisory Clients...
26 CFR 1.41-9T - Alternative simplified credit (temporary).
Code of Federal Regulations, 2010 CFR
2010-04-01
... 26 Internal Revenue 1 2010-04-01 2010-04-01 true Alternative simplified credit (temporary). 1.41... INCOME TAXES Credits Against Tax § 1.41-9T Alternative simplified credit (temporary). (a) Determination... provisions of the alternative simplified credit (ASC) in section 41(c)(5) for any taxable year of the...
15 CFR 740.9 - Temporary imports, exports, and reexports (TMP).
Code of Federal Regulations, 2013 CFR
2013-01-01
... the end of the beta test period as defined by the software producer or, if the software producer does... States; and exports and reexports of beta test software. (a) Temporary exports and reexports—(1) Scope. You may export and reexport commodities and software for temporary use abroad (including use in...
15 CFR 740.9 - Temporary imports, exports, and reexports (TMP).
Code of Federal Regulations, 2012 CFR
2012-01-01
... the end of the beta test period as defined by the software producer or, if the software producer does... States; and exports and reexports of beta test software. (a) Temporary exports and reexports—(1) Scope. You may export and reexport commodities and software for temporary use abroad (including use in...
77 FR 26791 - Records Schedules; Availability and Request for Comments
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-07
...-374- 09-7, 1 item, 1 temporary item). Master files of an electronic information system containing...-2012-0006, 1 item, 1 temporary item). Master files of an electronic information system used to document...-0001, 2 items, 2 temporary items). Master files and outputs of an electronic information system used to...
26 CFR 54.9815-2712T - Rules regarding rescissions (temporary).
Code of Federal Regulations, 2011 CFR
2011-04-01
... 26 Internal Revenue 17 2011-04-01 2011-04-01 false Rules regarding rescissions (temporary). 54.9815-2712T Section 54.9815-2712T Internal Revenue INTERNAL REVENUE SERVICE, DEPARTMENT OF THE TREASURY (CONTINUED) MISCELLANEOUS EXCISE TAXES (CONTINUED) PENSION EXCISE TAXES § 54.9815-2712T Rules regarding rescissions (temporary). (a) Prohibition on...