Sample records for test assembly tsta

  1. TSTA Piping and Flame Arrestor Operating Experience Data

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cadwallader, Lee C.; Willms, R. Scott

    The Tritium Systems Test Assembly (TSTA) was a facility dedicated to tritium handling technology and experiment research at the Los Alamos National Laboratory. The facility operated from 1984 to 2001, running a prototype fusion fuel processing loop with ~100 grams of tritium as well as small experiments. There have been several operating experience reports written on this facility’s operation and maintenance experience. This paper describes analysis of two additional components from TSTA, small diameter gas piping that handled small amounts of tritium in a nitrogen carrier gas, and the flame arrestor used in this piping system. The operating experiences andmore » the component failure rates for these components are discussed in this paper. Comparison data from other applications are also presented.« less

  2. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Anderson, J.L.; Jenkins, E.M.; Walthers, C.R.

    Compound cryopumps have been added to the Tritium Systems Test Assembly (TSTA) integrated fusion fuel loop. Operations have been performed which closely simulate an actual fusion reactor pumping scenario. In addition, performance data have been taken that support the concept of using coconut charcoal as a sorbent at 4K for pumping helium. Later tests show that coconut charcoal may be used to co-pump D,T and He mixtures on a single 4K panel. Rotary spiral pumps have been used successfully in several applications at TSTA and have acquired more than 9000 hours of maintenance-free operation. Metal bellows pumps have been usedmore » to back the spiral pumps and have been relatively trouble free in loop operations. Bellows pumps also have more than 9000 hours of maintenance-free operation. 5 refs., 6 figs.« less

  3. Tritium systems test assembly stabilization

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jasen, W. G.; Michelotti, R. A.; Anast, K. R.

    The Tritium Systems Test Assembly (TSTA) was a facility dedicated to tritium technology Research and Development (R&D) primarily for future fusion power reactors. The facility was conceived in mid 1970's, operations commenced in early 1980's, stabilization and deactivation began in 2000 and were completed in 2003. The facility will remain in a Surveillance and Maintenance (S&M) mode until the Department of Energy (DOE) funds demolition of the facility, tentatively in 2009. A safe and stable end state was achieved by the TSTA Facility Stabilization Project (TFSP) in anticipation of long term S&M. At the start of the stabilization project, withmore » an inventory of approximately 140 grams of tritium, the facility was designated a Hazard Category (HC) 2 Non-Reactor Nuclear facility as defined by US Department of Energy standard DOE-STD-1027-92 (1997). The TSTA facility comprises a laboratory area, supporting rooms, offices and associated laboratory space that included more than 20 major tritium handling systems. The project's focus was to reduce the tritium inventory by removing bulk tritium, tritiated water wastes, and tritium-contaminated high-inventory components. Any equipment that remained in the facility was stabilized in place. All of the gloveboxes and piping were rendered inoperative and vented to atmosphere. All equipment, and inventoried tritium contamination, remaining in the facility was left in a safe-and-stable state. The project used the End Points process as defined by the DOE Office of Environmental Management (web page http://www.em.doe.- gov/deact/epman.htmtlo) document and define the end state required for the stabilization of TSTA Facility. The End Points process added structure that was beneficial through virtually all phases of the project. At completion of the facility stabilization project the residual tritium inventory was approximately 3,000 curies, considerably less than the 1.6-gram threshold for a HC 3 facility. TSTA is now designated as a Radiological Facility. Innovative approaches were employed for characterization and removal of legacy wastes and high inventory components. Major accomplishments included: (1) Reduction of tritium inventory, elimination of chemical hazards, and identification and posting of remaining hazards. (2) Removal of legacy wastes. (3) Transferred equipment for reuse in other DOE projects, including some at other DOE facilities. (4) Transferred facility in a safe and stable condition to the S&M organization. The project successfully completed all project goals and the TSTA facility was transferred into S&M on August 1,2003. This project demonstrates the benefit of radiological inventory reduction and the removal of legacy wastes to achieve a safe and stable end state that protects workers and the environment pending eventual demolition of the facility.« less

  4. Configurations of a two-tiered amplified gene expression system in adenoviral vectors designed to improve the specificity of in vivo prostate cancer imaging

    PubMed Central

    Sato, M; Figueiredo, ML; Burton, JB; Johnson, M; Chen, M; Powell, R; Gambhir, SS; Carey, M; Wu, L

    2009-01-01

    Effective treatment for recurrent, disseminated prostate cancer is notably limited. We have developed adenoviral vectors with a prostate-specific two-step transcriptional amplification (TSTA) system that would express therapeutic genes at a robust level to target metastatic disease. The TSTA system employs the prostate-specific antigen (PSA) promoter/enhancer to drive a potent synthetic activator, which in turn activates the expression of the therapeutic gene. In this study, we explored different configurations of this bipartite system and discovered that physical separation of the two TSTA components into E1 and E3 regions of adenovirus was able to enhance androgen regulation and cell-discriminatory expression. The TSTA vectors that express imaging reporter genes were assessed by noninvasive imaging technologies in animal models. The improved selectivity of the E1E3 configured vector was reflected in silenced ectopic expression in the lung. Significantly, the enhanced specificity of the E1E3 vector enabled the detection of lung metastasis of prostate cancer. An E1E3 TSTA vector that expresses the herpes simplex virus thymidine kinase gene can effectively direct positron emission tomography (PET) imaging of the tumor. The prostate-targeted gene delivery vectors with robust and cell-specific expression capability will advance the development of safe and effective imaging guided therapy for recurrent metastatic stages of prostate cancer. PMID:18305574

  5. Delivery of two-step transcription amplification exendin-4 plasmid system with arginine-grafted bioreducible polymer in type 2 diabetes animal model

    PubMed Central

    Kim, Pyung-Hwan; Lee, Minhyung; Kim, Sung Wan

    2012-01-01

    Exendin-4, glucagon-like peptide 1 (GLP-1) receptor agonist, is an exocrine hormone, which has potent insulinotropic actions similar to GLP-1 such as stimulating insulin biosynthesis, facilitating glucose-concentration dependent insulin secretion, slowing gastric emptying, reducing food intake and stimulating β-cell proliferation. Exendin-4, also, has a longer half-life than GLP-1, due to itsresistance to degradation by dipeptidyl peptidase IV (DPP-IV). In spite of its many advantages as a therapeutic agent for diabetes, its clinical application is still restricted. Thus, to improve the activity of exendin-4 in vivo, gene therapy system was developed as an alternative method. An exendin-4 expression system was constructed using the two-step transcription amplification (TSTA) system, which is composed of pβ-Gal4-p65 and pUAS-SP-exendin-4 with combining the advantages of signal peptide (SP) in order to facilitate its secretion in ectopic cells or tissue. Arginine-grafted cyctaminebisacrylamide-diaminohexane polymer (ABP) was used as a gene carrier. Increased expression of exendin-4, glucose dependent insulin secretion in NIT-1 insulinoma cells, and high insulin expression in the presence of DPP-IV were evaluated in vitro after delivery of ABP/TSTA-SP-exendin-4. Blood glucose levels in diabetic mice were decreased dramatically from the third day for experimental period after single intravenous administration with ABP/TSTA-SP-exendin-4. The highest insulinotropic effect of exendin-4 was also observed in the ABP/TSTA/SP-exendin-4-treated mice groups, compared with the others groups from the 3rd day after injection. TSTA exendin-4 expression system with SP and ABP polymer has a potential gene therapy for the treatment of type 2 diabetes. PMID:22705459

  6. Export Control Requirements for Tritium Processing Design and R&D

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hollis, William Kirk; Maynard, Sarah-Jane Wadsworth

    This document will address requirements of export control associated with tritium plant design and processes. Los Alamos National Laboratory has been working in the area of tritium plant system design and research and development (R&D) since the early 1970’s at the Tritium Systems Test Assembly (TSTA). This work has continued to the current date with projects associated with the ITER project and other Office of Science Fusion Energy Science (OS-FES) funded programs. ITER is currently the highest funding area for the DOE OS-FES. Although export control issues have been integrated into these projects in the past a general guidance documentmore » has not been available for reference in this area. To address concerns with currently funded tritium plant programs and assist future projects for FES, this document will identify the key reference documents and specific sections within related to tritium research. Guidance as to the application of these sections will be discussed with specific detail to publications and work with foreign nationals.« less

  7. Export Control Requirements for Tritium Processing Design and R&D

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hollis, William Kirk; Maynard, Sarah-Jane Wadsworth

    2015-10-30

    This document will address requirements of export control associated with tritium plant design and processes. Los Alamos National Laboratory has been working in the area of tritium plant system design and research and development (R&D) since the early 1970’s at the Tritium Systems Test Assembly (TSTA). This work has continued to the current date with projects associated with the ITER project and other Office of Science Fusion Energy Science (OS-FES) funded programs. ITER is currently the highest funding area for the DOE OS-FES. Although export control issues have been integrated into these projects in the past a general guidance documentmore » has not been available for reference in this area. To address concerns with currently funded tritium plant programs and assist future projects for FES, this document will identify the key reference documents and specific sections within related to tritium research. Guidance as to the application of these sections will be discussed with specific detail to publications and work with foreign nationals.« less

  8. Comparative study of radiation, chemical, and aging effects on viral transformation. Annual progress report, 1975

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Coggin, J.H. Jr.

    Progress is reported on the following research projects: evaluation of isotopic antiglobulin test (IAT) to detect tumor associated antigens using antisera induced by x-irradiated tumor cells; development of cytotoxic antibody for embryonic antigens (EA); acrylamide gel cell culture assay for transformation; and evaluation of 3-MCA induced sarcomas for TSTA and cross-reacting antigens. (HLW)

  9. Gene therapy for human ovarian cancer cells using efficient expression of Fas gene combined with γδT cells.

    PubMed

    Lin, Jiajing; Zeng, Dingyuan; He, Hongying; Tan, Guangping; Lan, Ying; Jiang, Fuyan; Sheng, Shuting

    2017-10-01

    Low tissue specificity and efficiency of exogenous gene expression are the two major obstacles in tumor‑targeted gene therapy. The Fas cell surface death receptor (Fas)/Fas ligand pathway is one of the primary pathways responsible for the regulation of cell apoptosis. The aim of the present study was to explore whether the regulation of tumor specific promoters and a two‑step transcriptional amplification system (TSTA) assured efficient, targeted expression of their downstream Fas gene in human ovarian cancer cells, and to assess the killing effect of γδT cells on these cells with high Fas expression. Three shuttle plasmids containing different control elements of the human telomerase reverse transcriptase (hTERT) promoter and/or TSTA were constructed and packaged into adenovirus 5 (Ad5) vectors for the expression of exogenous Fas gene. The human ovarian cancer cell line SKOV3 and a control human embryonic lung fibroblast cell line were transfected with Ad5‑hTERT‑Fas or Ad5‑hTERT‑TSTA‑Fas. Fas mRNA and protein expression were examined by reverse transcription‑quantitative polymerase chain reaction and western blot analysis. γδT lymphocytes were isolated, cultured and mixed at different ratios with SKOV3 cells with Fas expression in order to assess the killing effect of γδT cells. hTERT promoter induced the specific expression of FAS gene in SKOV3 cells, and the TSTA strategy increased FAS expression by 14.2‑fold. The killing effect of γδT cells increased with the expression level of Fas and the effector‑target cell ratio. The killing rate for SKOV3 cells with high FAS expression was 72.5% at an effector‑target cell ratio of 40:1. The regulators of hTERT promoter and TSTA assure the efficient and targeted expression of their downstream Fas gene in SKOV3 cells. The killing effect of γδT cells for ovarian cancer cells with relatively high Fas expression was improved.

  10. Isoform composition and stoichiometry of the approx. 90-kDa heat shock protein associated with glucocorticoid receptors

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mendel, D.B.; Orti, E.

    1988-05-15

    The authors observed that the approx. 90-kDa non-steroid-binding component of nonactivated glucocorticoid receptors purified from WEHI-7 mouse thymoma cells (which has been identified as the approx. 90-kDa heat shock protein) consistently migrates as a doublet during polyacrylamide gel electrophoresis under denaturing and reducing conditions. It has recently been reported that murine Meth A cells contain a tumor-specific transplantation antigen (TSTA) which is related or identical to the approx. 90-kDa heat shock protein. The observation that TSTA and the approx. 90-kDa heat shock protein isolated from these cells exists as two isoforms of similar molecular mass and charge has suggested thatmore » the doublet observed is also due to the existence of two isoforms. They have therefore conducted this study to determine whether TSTA and the approx. 90-kDa component of glucocorticoid receptors are indeed related, to establish whether the receptor preferentially binds one isoform of the approx. 90-kDa heat shock protein, and to investigate the stoichiometry of the nonactivated receptor complex. They used the BuGr1 and AC88 monoclonal antibodies to purify, respectively, receptor-associated and free approx. 90-kDa heat shock protein from WEHI-7 cells grown for 48 h with (/sup 35/S)methionine to metabolically label proteins to steady state. The long-term metabolic labeling approach has also enabled them to directly determine that the purified non-activated glucocorticoid receptor contains a single steroid-binding protein and two approx. 90-kDa non-steroid-binding subunits. The consistency with which a approx. 1:2 stoichiometric ratio of steroid binding to approx. 90-kDa protein is observed supports the view that the approx. 90-kDa heat shock protein is a true component of nonactivated glucocorticoid-receptor complexes.« less

  11. Alcohol Dehydrogenase of Bacillus strain for Measuring Alcohol Electrochemically

    NASA Astrophysics Data System (ADS)

    Iswantini, D.; Nurhidayat, N.; Ferit, H.

    2017-03-01

    Alcohol dehydrogenase (ADH) was applied to produce alcohol biosensor. The enzyme was collected from cultured Bacillus sp. in solid media. From 6 tested isolates, bacteria from fermented rice grain (TST.A) showed the highest oxidation current which was further applied as the bioreceptor. Various ethanol concentrations was measured based on the increase of maximum oxidation current value. However, a reduction value was happened when the ethanol concentration was higher than 5%. Comparing the result of spectrophotometry measurement, R2 value obtained from the biosensor measurement method was higher. The new proposed method resulted a wider detection range, from 0.1-5% of ethanol concentration. The result showed that biosensor method has big potency to be used as alcohol detector in foods or bevearages.

  12. Selective suppression of autocatalytic caspase-3 driven by two-step transcriptional amplified human telomerase reverse transcriptase promoter on ovarian carcinoma growth in vitro and in mice.

    PubMed

    Song, Yue; Xin, Xing; Xia, Zhijun; Zhai, Xingyue; Shen, Keng

    2014-07-01

    The objective of our study was to construct recombinant adenovirus (rAd) AdHTVP2G5-rev-casp3, which expresses autocatalytic caspase-3 driven by human telomerase reverse transcriptase promoter (hTERTp) with a two-step transcription amplification (TSTA) system and investigate its antitumor effects on ovarian cancer in vitro and in vivo. Fluorescent detection was used to detect EGFP expression in various cells. Cell viabilities were determined using the Cell Counting Kit-8 and flow cytometry. RT-PCR and immunoblotting assays were used to detect cellular apoptotic activities. Tumor growth and survival of tumor-bearing mice were studied. The hTERTp-TSTA system showed the strongest activity in hTERT-positive cancer cells when compared with hTERTp and cytomeglovirus promoter (CMVp). In contrast, it showed no activity in hTERT‑negative HUVECs. AdHTVP2G5‑rev-casp3 markedly suppressed the survival of AO cells in a dose-dependent modality with a viability rate of 17.8 ± 3.5% at an MOI of 70, which was significantly lower than that by AdHT-rev-casp3 and Ad-rev-casp3 (rAds which express rev-caspase-3 driven by hTERTp and CMVp, respectively). In contrast, AdHTVP2G5‑rev-casp3 induced little HUVEC death with a viability rate of 92.7 ± 5.2% at the same MOI. Additionally, AdHTVP2G5-rev-casp3 (MOI=70) caused significant apoptosis in AO cells with an apoptotic rate of 42%. The tumor growth suppression rate of AdHTVP2G5-rev-casp3 was 81.52%, significantly higher than that of AdHT-rev-casp3 (54.94%) or Ad-rev-casp3 (21.35%). AdHTVP2G5-rev-casp3 significantly improved the survival of tumor-bearing mice with little liver damage, with a mean survival of 258 ± 28 days. These results showed that AdHTVP2G5-rev-casp3 caused effective apoptosis with significant tumor selectivity, strongly suppressed tumor growth and improved mouse survival with little liver toxicity. It can be a potent therapeutic agent for tumor targeted treatment of ovarian cancer.

  13. Optimal Assembly of Psychological and Educational Tests.

    ERIC Educational Resources Information Center

    van der Linden, Wim J.

    1998-01-01

    Reviews optimal test-assembly literature and introduces the contributions to this special issue. Discusses four approaches to computerized test assembly: (1) heuristic-based test assembly; (2) 0-1 linear programming; (3) network-flow programming; and (4) an optimal design approach. Contains a bibliography of 90 sources on test assembly.…

  14. 49 CFR 572.162 - Head assembly and test procedure.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Head assembly and test procedure. 572.162 Section... Hybrid III Six-Year-Old Weighted Child Test Dummy § 572.162 Head assembly and test procedure. The head assembly is assembled and tested as specified in 49 CFR 572.122 (Subpart N). ...

  15. 49 CFR 572.162 - Head assembly and test procedure.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Head assembly and test procedure. 572.162 Section... Hybrid III Six-Year-Old Weighted Child Test Dummy § 572.162 Head assembly and test procedure. The head assembly is assembled and tested as specified in 49 CFR 572.122 (Subpart N). ...

  16. 49 CFR 572.162 - Head assembly and test procedure.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Head assembly and test procedure. 572.162 Section... Hybrid III Six-Year-Old Weighted Child Test Dummy § 572.162 Head assembly and test procedure. The head assembly is assembled and tested as specified in 49 CFR 572.122 (Subpart N). ...

  17. 49 CFR 572.163 - Neck assembly and test procedure.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Neck assembly and test procedure. 572.163 Section... Hybrid III Six-Year-Old Weighted Child Test Dummy § 572.163 Neck assembly and test procedure. The neck assembly is assembled and tested as specified in 49 CFR 572.123 (Subpart N). ...

  18. 49 CFR 572.163 - Neck assembly and test procedure.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Neck assembly and test procedure. 572.163 Section... Hybrid III Six-Year-Old Weighted Child Test Dummy § 572.163 Neck assembly and test procedure. The neck assembly is assembled and tested as specified in 49 CFR 572.123 (Subpart N). ...

  19. 49 CFR 572.162 - Head assembly and test procedure.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 7 2011-10-01 2011-10-01 false Head assembly and test procedure. 572.162 Section... Hybrid III Six-Year-Old Weighted Child Test Dummy § 572.162 Head assembly and test procedure. The head assembly is assembled and tested as specified in 49 CFR 572.122 (Subpart N). ...

  20. 49 CFR 572.163 - Neck assembly and test procedure.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Neck assembly and test procedure. 572.163 Section... Hybrid III Six-Year-Old Weighted Child Test Dummy § 572.163 Neck assembly and test procedure. The neck assembly is assembled and tested as specified in 49 CFR 572.123 (Subpart N). ...

  1. 49 CFR 572.162 - Head assembly and test procedure.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Head assembly and test procedure. 572.162 Section... Hybrid III Six-Year-Old Weighted Child Test Dummy § 572.162 Head assembly and test procedure. The head assembly is assembled and tested as specified in 49 CFR 572.122 (Subpart N). ...

  2. 49 CFR 572.163 - Neck assembly and test procedure.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Neck assembly and test procedure. 572.163 Section... Hybrid III Six-Year-Old Weighted Child Test Dummy § 572.163 Neck assembly and test procedure. The neck assembly is assembled and tested as specified in 49 CFR 572.123 (Subpart N). ...

  3. 49 CFR 572.163 - Neck assembly and test procedure.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 7 2011-10-01 2011-10-01 false Neck assembly and test procedure. 572.163 Section... Hybrid III Six-Year-Old Weighted Child Test Dummy § 572.163 Neck assembly and test procedure. The neck assembly is assembled and tested as specified in 49 CFR 572.123 (Subpart N). ...

  4. Assembly, alignment and test of the Transiting Exoplanet Survey Satellite (TESS) optical assemblies

    NASA Astrophysics Data System (ADS)

    Balonek, Gregory; Brown, Joshua J.; Andre, James E.; Chesbrough, Christian D.; Chrisp, Michael P.; Dalpiaz, Michael; Lennon, Joseph; Richards, B. C.; Clark, Kristin E.

    2017-08-01

    The Transiting Exoplanet Survey Satellite (TESS) will carry four visible waveband, seven-element, refractive F/1.4 lenses, each with a 34 degree diagonal field of view. This paper describes the methods used for the assembly, alignment and test of the four flight optical assemblies. Prior to commencing the build of the four flight optical assemblies, a Risk Reduction Unit (RRU) was successfully assembled and tested [1]. The lessons learned from the RRU were applied to the build of the flight assemblies. The main modifications to the flight assemblies include the inking of the third lens element stray light mitigation, tighter alignment tolerances, and diamond turning for critical mechanical surfaces. Each of the optical assemblies was tested interferometrically and measured with a low coherence distance measuring interferometer (DMI) to predict the optimal shim thickness between the lens assembly and detector before -75°C environmental testing. In addition to individual test data, environmental test results from prior assemblies allow for the exploration of marginal performance differences between each of the optical assemblies.

  5. 49 CFR 572.152 - Head assembly and test procedure.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Head assembly and test procedure. 572.152 Section... 12-Month-Old Infant, Alpha Version § 572.152 Head assembly and test procedure. (a) The head assembly (refer to § 572.150(a)(1)(i)) for this test consists of the assembly (drawing 921022-001), triaxial mount...

  6. 49 CFR 572.152 - Head assembly and test procedure.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 7 2011-10-01 2011-10-01 false Head assembly and test procedure. 572.152 Section... 12-Month-Old Infant, Alpha Version § 572.152 Head assembly and test procedure. (a) The head assembly (refer to § 572.150(a)(1)(i)) for this test consists of the assembly (drawing 921022-001), triaxial mount...

  7. 49 CFR 572.152 - Head assembly and test procedure.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Head assembly and test procedure. 572.152 Section... 12-Month-Old Infant, Alpha Version § 572.152 Head assembly and test procedure. (a) The head assembly (refer to § 572.150(a)(1)(i)) for this test consists of the assembly (drawing 921022-001), triaxial mount...

  8. 49 CFR 572.152 - Head assembly and test procedure.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Head assembly and test procedure. 572.152 Section... 12-Month-Old Infant, Alpha Version § 572.152 Head assembly and test procedure. (a) The head assembly (refer to § 572.150(a)(1)(i)) for this test consists of the assembly (drawing 921022-001), triaxial mount...

  9. Regeneration and tritium recovery from the large JET neutral injection cryopump system after the FTE

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Obert, W.; Bell, A.; Davies, J.

    1992-12-01

    Neutral Beam Injection (NBI) was used to introduce tritium into the plasma for the First Tritium Experiment In addition to the decisive advantage of depositing the tritium into the centre of the plasma, the use of NBI also minimized the total quantity of tritium introduced into the Torus and the contamination of the vacuum vessel. However, because of the relatively low gas efficiency of the positive ion injection system approximately 95% of the total quantity of tritium introduced was pumped by the large condensation cryopumps which form an integral part of the injector. Several hardware and associated software changes weremore » implemented in order to making provision for possible fault scenarios during operation with tritium and to ensure complete regeneration of the tritium from the cryopumps. The tritium released after all subsequent regeneration`s has been monitored carefully in order to determine the amount of tritium retained by the black anodized liquid nitrogen panel surfaces of the cryopump and to compare it with experiments at TSTA on JET samples before the FTE.« less

  10. Regeneration and tritium recovery from the large JET neutral injection cryopump system after the FTE. [First Tritium Experiment (FTE)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Obert, W.; Bell, A.; Davies, J.

    1992-01-01

    Neutral Beam Injection (NBI) was used to introduce tritium into the plasma for the First Tritium Experiment In addition to the decisive advantage of depositing the tritium into the centre of the plasma, the use of NBI also minimized the total quantity of tritium introduced into the Torus and the contamination of the vacuum vessel. However, because of the relatively low gas efficiency of the positive ion injection system approximately 95% of the total quantity of tritium introduced was pumped by the large condensation cryopumps which form an integral part of the injector. Several hardware and associated software changes weremore » implemented in order to making provision for possible fault scenarios during operation with tritium and to ensure complete regeneration of the tritium from the cryopumps. The tritium released after all subsequent regeneration's has been monitored carefully in order to determine the amount of tritium retained by the black anodized liquid nitrogen panel surfaces of the cryopump and to compare it with experiments at TSTA on JET samples before the FTE.« less

  11. 49 CFR 572.122 - Head assembly and test procedure.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 7 2011-10-01 2011-10-01 false Head assembly and test procedure. 572.122 Section...-year-old Child Test Dummy, Beta Version § 572.122 Head assembly and test procedure. (a) The head assembly for this test consists of the complete head (drawing 127-1000), a six-axis neck transducer...

  12. 49 CFR 572.122 - Head assembly and test procedure.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Head assembly and test procedure. 572.122 Section...-year-old Child Test Dummy, Beta Version § 572.122 Head assembly and test procedure. (a) The head assembly for this test consists of the complete head (drawing 127-1000), a six-axis neck transducer...

  13. 49 CFR 572.122 - Head assembly and test procedure.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Head assembly and test procedure. 572.122 Section...-year-old Child Test Dummy, Beta Version § 572.122 Head assembly and test procedure. (a) The head assembly for this test consists of the complete head (drawing 127-1000), a six-axis neck transducer...

  14. 49 CFR 572.122 - Head assembly and test procedure.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Head assembly and test procedure. 572.122 Section...-year-old Child Test Dummy, Beta Version § 572.122 Head assembly and test procedure. (a) The head assembly for this test consists of the complete head (drawing 127-1000), a six-axis neck transducer...

  15. 49 CFR 572.172 - Head assembly and test procedure.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Head assembly and test procedure. 572.172 Section... Hybrid III 10-Year-Old Child Test Dummy (HIII-10C) § 572.172 Head assembly and test procedure. (a) The head assembly for this test consists of the complete head (drawing 420-1000), a six-axis neck...

  16. 49 CFR 572.142 - Head assembly and test procedure.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Head assembly and test procedure. 572.142 Section...-year-Old Child Crash Test Dummy, Alpha Version § 572.142 Head assembly and test procedure. (a) The head assembly (refer to § 572.140(a)(1)(i)) for this test consists of the head (drawing 210-1000), adapter plate...

  17. 49 CFR 572.172 - Head assembly and test procedure.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Head assembly and test procedure. 572.172 Section... Hybrid III 10-Year-Old Child Test Dummy (HIII-10C) § 572.172 Head assembly and test procedure. (a) The head assembly for this test consists of the complete head (drawing 420-1000), a six-axis neck...

  18. 49 CFR 572.172 - Head assembly and test procedure.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Head assembly and test procedure. 572.172 Section... Hybrid III 10-Year-Old Child Test Dummy (HIII-10C) § 572.172 Head assembly and test procedure. (a) The head assembly for this test consists of the complete head (drawing 420-1000), a six-axis neck...

  19. 49 CFR 572.132 - Head assembly and test procedure.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Head assembly and test procedure. 572.132 Section... Hybrid III 5th Percentile Female Test Dummy, Alpha Version § 572.132 Head assembly and test procedure. (a) The head assembly (refer to § 572.130(a)(1)(i)) for this test consists of the complete head (drawing...

  20. 49 CFR 572.142 - Head assembly and test procedure.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 7 2011-10-01 2011-10-01 false Head assembly and test procedure. 572.142 Section...-year-Old Child Crash Test Dummy, Alpha Version § 572.142 Head assembly and test procedure. (a) The head assembly (refer to § 572.140(a)(1)(i)) for this test consists of the head (drawing 210-1000), adapter plate...

  1. 49 CFR 572.132 - Head assembly and test procedure.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Head assembly and test procedure. 572.132 Section... Hybrid III 5th Percentile Female Test Dummy, Alpha Version § 572.132 Head assembly and test procedure. (a) The head assembly (refer to § 572.130(a)(1)(i)) for this test consists of the complete head (drawing...

  2. 49 CFR 572.142 - Head assembly and test procedure.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Head assembly and test procedure. 572.142 Section...-year-Old Child Crash Test Dummy, Alpha Version § 572.142 Head assembly and test procedure. (a) The head assembly (refer to § 572.140(a)(1)(i)) for this test consists of the head (drawing 210-1000), adapter plate...

  3. 49 CFR 572.132 - Head assembly and test procedure.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 7 2011-10-01 2011-10-01 false Head assembly and test procedure. 572.132 Section... Hybrid III 5th Percentile Female Test Dummy, Alpha Version § 572.132 Head assembly and test procedure. (a) The head assembly (refer to § 572.130(a)(1)(i)) for this test consists of the complete head (drawing...

  4. 49 CFR 572.132 - Head assembly and test procedure.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Head assembly and test procedure. 572.132 Section... Hybrid III 5th Percentile Female Test Dummy, Alpha Version § 572.132 Head assembly and test procedure. (a) The head assembly (refer to § 572.130(a)(1)(i)) for this test consists of the complete head (drawing...

  5. 49 CFR 572.142 - Head assembly and test procedure.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Head assembly and test procedure. 572.142 Section...-year-Old Child Crash Test Dummy, Alpha Version § 572.142 Head assembly and test procedure. (a) The head assembly (refer to § 572.140(a)(1)(i)) for this test consists of the head (drawing 210-1000), adapter plate...

  6. 49 CFR 572.132 - Head assembly and test procedure.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Head assembly and test procedure. 572.132 Section... Hybrid III 5th Percentile Female Test Dummy, Alpha Version § 572.132 Head assembly and test procedure. (a) The head assembly (refer to § 572.130(a)(1)(i)) for this test consists of the complete head (drawing...

  7. 49 CFR 572.135 - Upper and lower torso assemblies and torso flexion test procedure.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Upper and lower torso assemblies and torso flexion... torso assemblies and torso flexion test procedure. (a) Upper/lower torso assembly. The test objective is... (drawing 880105-434), on resistance to articulation between the upper torso assembly (drawing 880105-300...

  8. 49 CFR 572.135 - Upper and lower torso assemblies and torso flexion test procedure.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Upper and lower torso assemblies and torso flexion... torso assemblies and torso flexion test procedure. (a) Upper/lower torso assembly. The test objective is... (drawing 880105-434), on resistance to articulation between the upper torso assembly (drawing 880105-300...

  9. 49 CFR 572.125 - Upper and lower torso assemblies and torso flexion test procedure.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Upper and lower torso assemblies and torso flexion... assemblies and torso flexion test procedure. (a) Upper/lower torso assembly. The test objective is to...), and abdominal insert (drawing 127-8210), on resistance to articulation between upper torso assembly...

  10. 49 CFR 572.135 - Upper and lower torso assemblies and torso flexion test procedure.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Upper and lower torso assemblies and torso flexion... torso assemblies and torso flexion test procedure. (a) Upper/lower torso assembly. The test objective is... (drawing 880105-434), on resistance to articulation between the upper torso assembly (drawing 880105-300...

  11. 49 CFR 572.125 - Upper and lower torso assemblies and torso flexion test procedure.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 7 2011-10-01 2011-10-01 false Upper and lower torso assemblies and torso flexion... assemblies and torso flexion test procedure. (a) Upper/lower torso assembly. The test objective is to...), and abdominal insert (drawing 127-8210), on resistance to articulation between upper torso assembly...

  12. 49 CFR 572.125 - Upper and lower torso assemblies and torso flexion test procedure.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Upper and lower torso assemblies and torso flexion... assemblies and torso flexion test procedure. (a) Upper/lower torso assembly. The test objective is to...), and abdominal insert (drawing 127-8210), on resistance to articulation between upper torso assembly...

  13. 49 CFR 572.135 - Upper and lower torso assemblies and torso flexion test procedure.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 7 2011-10-01 2011-10-01 false Upper and lower torso assemblies and torso flexion... torso assemblies and torso flexion test procedure. (a) Upper/lower torso assembly. The test objective is... (drawing 880105-434), on resistance to articulation between the upper torso assembly (drawing 880105-300...

  14. 49 CFR 572.125 - Upper and lower torso assemblies and torso flexion test procedure.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Upper and lower torso assemblies and torso flexion... assemblies and torso flexion test procedure. (a) Upper/lower torso assembly. The test objective is to...), and abdominal insert (drawing 127-8210), on resistance to articulation between upper torso assembly...

  15. 49 CFR 572.165 - Upper and lower torso assemblies and torso flexion test procedure.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Upper and lower torso assemblies and torso flexion... assemblies and torso flexion test procedure. (a) Upper/lower torso assembly. The test objective is to... (specified in 49 CFR 572.125(a)), on resistance to articulation between the upper torso assembly (drawing 167...

  16. 49 CFR 572.165 - Upper and lower torso assemblies and torso flexion test procedure.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Upper and lower torso assemblies and torso flexion... assemblies and torso flexion test procedure. (a) Upper/lower torso assembly. The test objective is to... (specified in 49 CFR 572.125(a)), on resistance to articulation between the upper torso assembly (drawing 167...

  17. 49 CFR 572.165 - Upper and lower torso assemblies and torso flexion test procedure.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Upper and lower torso assemblies and torso flexion... assemblies and torso flexion test procedure. (a) Upper/lower torso assembly. The test objective is to... (specified in 49 CFR 572.125(a)), on resistance to articulation between the upper torso assembly (drawing 167...

  18. 49 CFR 572.165 - Upper and lower torso assemblies and torso flexion test procedure.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 7 2011-10-01 2011-10-01 false Upper and lower torso assemblies and torso flexion... assemblies and torso flexion test procedure. (a) Upper/lower torso assembly. The test objective is to... (specified in 49 CFR 572.125(a)), on resistance to articulation between the upper torso assembly (drawing 167...

  19. 49 CFR 572.165 - Upper and lower torso assemblies and torso flexion test procedure.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Upper and lower torso assemblies and torso flexion... assemblies and torso flexion test procedure. (a) Upper/lower torso assembly. The test objective is to... (specified in 49 CFR 572.125(a)), on resistance to articulation between the upper torso assembly (drawing 167...

  20. Tests of an alternate mobile transporter and extravehicular activity assembly procedure for the Space Station Freedom truss

    NASA Technical Reports Server (NTRS)

    Heard, Walter L., Jr.; Watson, Judith J.; Lake, Mark S.; Bush, Harold G.; Jensen, J. Kermit; Wallsom, Richard E.; Phelps, James E.

    1992-01-01

    Results are presented from a ground test program of an alternate mobile transporter (MT) concept and extravehicular activity (EVA) assembly procedure for the Space Station Freedom (SSF) truss keel. A three-bay orthogonal tetrahedral truss beam consisting of 44 2-in-diameter struts and 16 nodes was assembled repeatedly in neutral buoyancy by pairs of pressure-suited test subjects working from astronaut positioning devices (APD's) on the MT. The truss bays were cubic with edges 15 ft long. All the truss joint hardware was found to be EVA compatible. The average unit assembly time for a single pair of experienced test subjects was 27.6 sec/strut, which is about half the time derived from other SSF truss assembly tests. A concept for integration of utility trays during truss assembly is introduced and demonstrated in the assembly tests. The concept, which requires minimal EVA handling of the trays, is shown to have little impact on overall assembly time. The results of these tests indicate that by using an MT equipped with APD's, rapid EVA assembly of a space station-size truss structure can be expected.

  1. An Interactive Method to Solve Infeasibility in Linear Programming Test Assembling Models

    ERIC Educational Resources Information Center

    Huitzing, Hiddo A.

    2004-01-01

    In optimal assembly of tests from item banks, linear programming (LP) models have proved to be very useful. Assembly by hand has become nearly impossible, but these LP techniques are able to find the best solutions, given the demands and needs of the test to be assembled and the specifics of the item bank from which it is assembled. However,…

  2. 1. MISSILE TEST AND ASSEMBLY BUILDING, FRONT, LOOKING SOUTH. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. MISSILE TEST AND ASSEMBLY BUILDING, FRONT, LOOKING SOUTH. - NIKE Missile Base SL-40, Missile Test & Assembly Building, South end of launch area, northeast of Generator Building No. 3, Hecker, Monroe County, IL

  3. Swing-arm beam erector (SABER) concept for single astronaut assembly of space structure

    NASA Technical Reports Server (NTRS)

    Watson, J. J.; Heard, W. L., Jr.; Jensen, J. K.

    1985-01-01

    Results are presented of tests conducted to evaluate a mobile work station/assembly fixture concept that would mechanically assist an astronaut in the on-orbit manual assembly of erectable truss-beams. The concept eliminates astronaut manual translation by use of a motorized work platform with foot restraints. The tests involved assembly of a tetrahedral truss-beam by a test subject in simulated zero gravity (neutral bouyancy in water). A three-bay truss-beam was assembled from 30 aluminum struts with quick-attachment structural joints. The results show that average on-orbit assembly rates of 2.1 struts per minute can be expected for struts of the size employed in these tests.

  4. 4. MISSILE TEST AND ASSEMBLY BUILDING, LEFT SIDE, LOOKING NORTH. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. MISSILE TEST AND ASSEMBLY BUILDING, LEFT SIDE, LOOKING NORTH. - NIKE Missile Base SL-40, Missile Test & Assembly Building, South end of launch area, northeast of Generator Building No. 3, Hecker, Monroe County, IL

  5. 2. MISSILE TEST AND ASSEMBLY BUILDING, RIGHT SIDE, LOOKING WEST. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. MISSILE TEST AND ASSEMBLY BUILDING, RIGHT SIDE, LOOKING WEST. - NIKE Missile Base SL-40, Missile Test & Assembly Building, South end of launch area, northeast of Generator Building No. 3, Hecker, Monroe County, IL

  6. 3. MISSILE TEST AND ASSEMBLY BUILDING, REAR SIDE, LOOKING NORTH. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. MISSILE TEST AND ASSEMBLY BUILDING, REAR SIDE, LOOKING NORTH. - NIKE Missile Base SL-40, Missile Test & Assembly Building, South end of launch area, northeast of Generator Building No. 3, Hecker, Monroe County, IL

  7. Berthing mechanism final test report and program assessment

    NASA Technical Reports Server (NTRS)

    1988-01-01

    The purpose is to document the testing performed on both hardware and software developed under the Space Station Berthing Mechanisms Program. Testing of the mechanism occurred at three locations. Several system components, e.g., actuators and computer systems, were functionally tested before assembly. A series of post assembly tests were performed. The post assembly tests, as well as the dynamic testing of the mechanism, are presented.

  8. 49 CFR 572.145 - Upper and lower torso assemblies and torso flexion test procedure.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Upper and lower torso assemblies and torso flexion... assemblies and torso flexion test procedure. (a) The test objective is to determine the resistance of the... upper and lower halves of the torso assembly (refer to § 572.140(a)(1)(iv)). (b)(1) When the upper half...

  9. 49 CFR 572.145 - Upper and lower torso assemblies and torso flexion test procedure.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 7 2011-10-01 2011-10-01 false Upper and lower torso assemblies and torso flexion... assemblies and torso flexion test procedure. (a) The test objective is to determine the resistance of the... upper and lower halves of the torso assembly (refer to § 572.140(a)(1)(iv)). (b)(1) When the upper half...

  10. 49 CFR 572.145 - Upper and lower torso assemblies and torso flexion test procedure.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Upper and lower torso assemblies and torso flexion... assemblies and torso flexion test procedure. (a) The test objective is to determine the resistance of the... upper and lower halves of the torso assembly (refer to § 572.140(a)(1)(iv)). (b)(1) When the upper half...

  11. 49 CFR 572.145 - Upper and lower torso assemblies and torso flexion test procedure.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Upper and lower torso assemblies and torso flexion... assemblies and torso flexion test procedure. (a) The test objective is to determine the resistance of the... upper and lower halves of the torso assembly (refer to § 572.140(a)(1)(iv)). (b)(1) When the upper half...

  12. SSME component assembly and life management expert system

    NASA Technical Reports Server (NTRS)

    Ali, M.; Dietz, W. E.; Ferber, H. J.

    1989-01-01

    The space shuttle utilizes several rocket engine systems, all of which must function with a high degree of reliability for successful mission completion. The space shuttle main engine (SSME) is by far the most complex of the rocket engine systems and is designed to be reusable. The reusability of spacecraft systems introduces many problems related to testing, reliability, and logistics. Components must be assembled from parts inventories in a manner which will most effectively utilize the available parts. Assembly must be scheduled to efficiently utilize available assembly benches while still maintaining flight schedules. Assembled components must be assigned to as many contiguous flights as possible, to minimize component changes. Each component must undergo a rigorous testing program prior to flight. In addition, testing and assembly of flight engines and components must be done in conjunction with the assembly and testing of developmental engines and components. The development, testing, manufacture, and flight assignments of the engine fleet involves the satisfaction of many logistical and operational requirements, subject to many constraints. The purpose of the SSME Component Assembly and Life Management Expert System (CALMES) is to assist the engine assembly and scheduling process, and to insure that these activities utilize available resources as efficiently as possible.

  13. Neutral buoyancy test evaluation of hardware and extravehicular activity procedures for on-orbit assembly of a 14 meter precision reflector

    NASA Technical Reports Server (NTRS)

    Heard, Walter L., Jr.; Lake, Mark S.

    1993-01-01

    A procedure that enables astronauts in extravehicular activity (EVA) to perform efficient on-orbit assembly of large paraboloidal precision reflectors is presented. The procedure and associated hardware are verified in simulated Og (neutral buoyancy) assembly tests of a 14 m diameter precision reflector mockup. The test article represents a precision reflector having a reflective surface which is segmented into 37 individual panels. The panels are supported on a doubly curved tetrahedral truss consisting of 315 struts. The entire truss and seven reflector panels were assembled in three hours and seven minutes by two pressure-suited test subjects. The average time to attach a panel was two minutes and three seconds. These efficient assembly times were achieved because all hardware and assembly procedures were designed to be compatible with EVA assembly capabilities.

  14. 5. MISSILE TEST AND ASSEMBLY BUILDING, FRONT AND RIGHT SIDES, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. MISSILE TEST AND ASSEMBLY BUILDING, FRONT AND RIGHT SIDES, LOOKING SOUTHEAST. - NIKE Missile Base SL-40, Missile Test & Assembly Building, South end of launch area, northeast of Generator Building No. 3, Hecker, Monroe County, IL

  15. 6. MISSILE TEST AND ASSEMBLY BUILDING, REAR AND LEFT SIDES, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. MISSILE TEST AND ASSEMBLY BUILDING, REAR AND LEFT SIDES, LOOKING NORTHWEST. - NIKE Missile Base SL-40, Missile Test & Assembly Building, South end of launch area, northeast of Generator Building No. 3, Hecker, Monroe County, IL

  16. Optimal Testlet Pool Assembly for Multistage Testing Designs

    ERIC Educational Resources Information Center

    Ariel, Adelaide; Veldkamp, Bernard P.; Breithaupt, Krista

    2006-01-01

    Computerized multistage testing (MST) designs require sets of test questions (testlets) to be assembled to meet strict, often competing criteria. Rules that govern testlet assembly may dictate the number of questions on a particular subject or may describe desirable statistical properties for the test, such as measurement precision. In an MST…

  17. [Hybrids of human and monkey adenoviruses (adeno-adeno hybrids) that can reproduce in monkey cells: biological and molecular genetic peculiarities].

    PubMed

    Grinenko, N F; Savitskaia, N V; Pashvykina, G V; Al'tshteĭn, A D

    2003-06-01

    A highly oncogenic monkey adenovirus SA7(C8) facilitates the reproduction of human adenovirus type 2 (Ad2) in monkey cells. Upon mixed infection of monkey cells with both viruses, these viruses recombine producing defective adeno-adeno hybrids Ad2C8 serologically identical to Ad2 and capable of assisting Ad2 to reproduce in monkey cells. Ad2C8 and Ad2 form an intercomplementary pair inseparable in monkey cells. Unlike oncogenic SA7(C8), Ad2C8 is a nononcogenic virus for hamsters but is able to induce tumor antigens of this virus (T and TSTA). Molecular genetic analysis of 68 clones of adeno-adeno hybrids revealed that the left part of their genome consists of Ad2 DNA, and the right part contains no less than 40% of the viral SA7(C8) genome where E2A, E3, and E4 genes are located. Apparently, the products of these genes contribute to the composition of adenoviral tumor antigens, while the E4 gene is involved in complementation of monkey and human adenoviruses and makes a contribution to host range determination of these viruses.

  18. Enhanced Incretin Effects of Exendin-4 Expressing Chimeric Plasmid Based On Two-Step Transcription Amplification System with Dendritic Bioreducible Polymer for the Treatment of Type 2 Diabetes

    PubMed Central

    Kim, Pyung-Hwan; Lee, Minhyung; Nam, Kihoon; Kim, Sung Wan

    2014-01-01

    Glucagon-like peptide 1 (GLP-1) agonist, exenxdin-4, is currently being advanced as a promising diabetes remedy via a variety of incretin actions similar with GLP-1. In this study, we investigated an effective anti-diabetic therapy via exendin-4 expressing chimeric plasmid based on two-step transcription amplification (TSTA) system with dendrimer-type bioreducible polymer for more improved incretin-based gene therapy. Arginine-grafted poly (cystaminebisacrylamide-diaminohexane) (ABP)-conjugated poly (amido amine) (PAMAM) dendrimer (PAM-ABP) was used as gene carrier. PAM-ABP/chimeric DNA polyplex was markedly elevated exendin-4 expression in ectopic cells as well as increased insulin production through an enhanced activation of protein kinase K (PKA) induced by up-regulation of exendin-4-stimulated cyclic adenosine monophosphate (cAMP) in pancreatic β-cell. Consistent with these results, intravenous administration of PAM-ABP/chimeric DNA polyplex improved glucoregulotory effects, as well as increased insulin secretion by high expression of exendin-4 in blood in type 2 diabetic mice with no any toxicity. Our exendin-4 system can be attributed to provide a potential diabetes therapeutic agent for improved incretin gene therapy. PMID:24839613

  19. [Construction of autocatalytic caspase-3 driven by amplified human telomerase reverse transcriptase promoter and its enhanced efficacy of inducing apoptosis in human ovarian carcinoma].

    PubMed

    Song, Yue; Shen, Keng; He, Chun-Xia

    2007-09-01

    To construct recombinant adenoviral vector expressing autocatalysis caspase-3 driven by human telomerase reverse transcriptase promoter amplified by two-step transcription amplification (hTERTp-TSTA), and investigate its antitumor effect in ovarian cancer in vitro and in vivo. Recombinant adenoviruses expressing autocatalytic caspase-3 (rev-caspase-3) driven by hTERTp-TSTA were prepared, which were named as AdHTVP2G5-rev-casp3. AdHT-rev-casp3, Ad-rev-casp3 and AdHTVP2G5-EGEP, which express rev-caspase-3 driven by hTERTp, cytomegalovirus promoter (CMVp) and enhanced green fluorescent protein (EGFP), respectively, were used as controls. Western blot, cell counting kit (CCK-8), flow cytometry (FCM) and TdT-mediated dUTP-biotin nick end labeling (TUNEL) were used to detect the expression of p17, active subunit of caspase-3, and p85, and to measure cell survival rates, apoptotic rates and cell cycle distribution in ovarian cell line AO and normal human umbilical vein endothelial cell line HUVEC, following treatments of AdHTVP2G5-rev-casp3. subcutaneous tumor models and abdominally spread tumor models of human ovarian carcinoma using AO cells in BALB/c nude mice were established. Following treatments of AdHTVP2G5-rev-casp3, western blot was used to detect the expression of active caspase-3 in abdominally spread tumors and liver tissues, respectively, and the mouse survival rates and the volume of tumor nodules were measured, and the serum level of alanine transaminase (ALT) and aspartate transaminase (AST) were analyzed to monitor liver damages and HE staining was used to detect the histopathological changes of various organs. The levels of p17 expression in AdHTVP2G5-rev-casp3-treated AO cells were significantly higher than that in Ad-rev-casp3 or AdHT-rev-casp3 treated AO cells, while no expression was observed in AdHTVP2G5-rev-casp3-treated HUVEC. There was strong cell killing of AdHTVP2G5-rev-casp3 of hTERT positive AO cells, but not of the hTERT-negative HUVEC cells. Cell survival rate and apoptotic rate of AO cells treated with AdHTVP2G5-rev-casp3 were 17.8% and 40.2%, respectively, significantly different from that treated with AdHT-rev-casp3 (75.2% and 16.1%) at the multiplicity of infection (MOI) of 70 (P < 0.01). There was no significant difference in HUVEC cell survival rate and apoptotic rate between AdHTVP2G5-rev-casp3 treatment (97.7% and 2.1%, respectively) and AdHT-rev-casp3 treatment (98.5% and 1.7%, respectively) at the same MOI (P > 0.05). Significant expressions of active caspase-3 were shown in AdHTVP2G5-rev-casp3-treated tumors, whereas no expression was shown in liver. In contrast, both tumors and liver tissues showed active caspase-3 expression following treatments of Ad-rev-casp3. AdHTVP2G5-rev-casp3 and Ad-rev-casp3 prolonged mouse survival [mean survival time of (259 +/- 14) d and (213 +/- 16) d], when compared with treatment with AdHT-rev-casp3 [(177 +/- 12) d] and AdHTVP2G5-EGFP [(109 +/- 7) d; P < 0.01]. The mean volume of AdHTVP2G5-rev-casp3-treated tumor was 406 mm(3), significantly less than those of AdHT-rev-casp3 treatment (990 mm(3)), Ad-rev-casp3 treatment (645 mm(3)) and AdHTVP2G5-EGFP treatment (1728 mm(3); P < 0.01). The serum ALT and AST levels were not significantly elevated in AdHTVP2G5-rev-casp3-treated mice, whereas significantly elevated in Ad-rev-casp3-treated mice. No obvious lesions were found in any organ in AdHTVP2G5-rev-casp-treated group. Recombinant adenovirus AdHTVP2G5-rev-casp3 expressing rev-caspase-3 driven by hTERTp-TSTA can result in marked cell apoptosis with significant tumor targeting, suppressing tumor growth and prolonging the mouse survival, meanwhile, it can prevent against the liver toxicity induced by rev-caspase-3.

  20. Surrogate fuel assembly multi-axis shaker tests to simulate normal conditions of rail and truck transport

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McConnell, Paul E.; Koenig, Greg John; Uncapher, William Leonard

    2016-05-01

    This report describes the third set of tests (the “DCLa shaker tests”) of an instrumented surrogate PWR fuel assembly. The purpose of this set of tests was to measure strains and accelerations on Zircaloy-4 fuel rods when the PWR assembly was subjected to rail and truck loadings simulating normal conditions of transport when affixed to a multi-axis shaker. This is the first set of tests of the assembly simulating rail normal conditions of transport.

  1. Surrogate fuel assembly multi-axis shaker tests to simulate normal conditions of rail and truck transport

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McConnell, Paul E.; Koenig, Greg John; Uncapher, William Leonard

    2016-05-12

    This report describes the third set of tests (the “DCL a shaker tests”) of an instrumented surrogate PWR fuel assembly. The purpose of this set of tests was to measure strains and accelerations on Zircaloy-4 fuel rods when the PWR assembly was subjected to rail and truck loadings simulating normal conditions of transport when affixed to a multi-axis shaker. This is the first set of tests of the assembly simulating rail normal conditions of transport.

  2. Committee Meeting of Assembly Education Committee "To Receive Testimony from the Commissioner of Education, Mary Lee Fitzgerald, Department Staff, and Others Concerning the Department's Skills Testing Program, Including the Early Warning Test and High School Proficiency Test, Pursuant to Assembly Resolution No. 113."

    ERIC Educational Resources Information Center

    New Jersey State Office of Legislative Services, Trenton. Assembly Education Committee.

    The Assembly Education Committee of the New Jersey Office of Legislative Services held a hearing pursuant to Assembly Resolution 113, a proposal directing the Committee to investigate the skills testing program developed and administered to New Jersey children by the State Department of Education. The Committee was interested in the eighth-grade…

  3. A System for the Automatic Assembly of Test Questions Using a No-SQL Database

    ERIC Educational Resources Information Center

    Shin, Sanggyu; Hashimoto, Hiroshi

    2014-01-01

    We describe a system that automatically assembles test questions from a set of examples. Our system can create test questions appropriate for each user's level at low cost. In particular, when a user review their lesson, our system provides new test questions which are assembled based on their previous test results and past mistakes, rather than a…

  4. Micro electro-mechanical heater

    DOEpatents

    Oh, Yunje; Asif, Syed Amanulla Syed; Cyrankowski, Edward; Warren, Oden Lee

    2016-04-19

    A sub-micron scale property testing apparatus including a test subject holder and heating assembly. The assembly includes a holder base configured to couple with a sub-micron mechanical testing instrument and electro-mechanical transducer assembly. The assembly further includes a test subject stage coupled with the holder base. The test subject stage is thermally isolated from the holder base. The test subject stage includes a stage subject surface configured to receive a test subject, and a stage plate bracing the stage subject surface. The stage plate is under the stage subject surface. The test subject stage further includes a heating element adjacent to the stage subject surface, the heating element is configured to generate heat at the stage subject surface.

  5. Micro electro-mechanical heater

    DOEpatents

    Oh, Yunje; Asif, Syed Amanulla Syed; Cyrankowski, Edward; Warren, Oden Lee

    2017-09-12

    A sub-micron scale property testing apparatus including a test subject holder and heating assembly. The assembly includes a holder base configured to couple with a sub-micron mechanical testing instrument and electro-mechanical transducer assembly. The assembly further includes a test subject stage coupled with the holder base. The test subject stage is thermally isolated from the holder base. The test subject stage includes a stage subject surface configured to receive a test subject, and a stage plate bracing the stage subject surface. The stage plate is under the stage subject surface. The test subject stage further includes a heating element adjacent to the stage subject surface, the heating element is configured to generate heat at the stage subject surface.

  6. Fabrication of capsule assemblies, phase 3

    NASA Technical Reports Server (NTRS)

    Keeton, A. R.; Stemann, L. G.

    1973-01-01

    Thirteen capsule assemblies were fabricated for evaluation of fuel pin design concepts for a fast spectrum lithium cooled compact space power reactor. These instrumented assemblies were designed for real time test of prototype fuel pins. Uranium mononitride fuel pins were encased in AISI 304L stainless steel capsules. Fabrication procedures were fully qualified by process development and assembly qualification tests. Instrumentation reliability was achieved utilizing specially processed and closely controlled thermocouple hot zone fabrication and by thermal screening tests. Overall capsule reliability was achieved with an all electron beam welded assembly.

  7. Process for Testing Compaction of a Swaged Heater for an Anode Sub-Assembly of a Hollow Cathode Assembly

    NASA Technical Reports Server (NTRS)

    Patterson, Michael J. (Inventor); Verhey, Timothy R. R. (Inventor); Soulas, George C. (Inventor)

    2003-01-01

    A process for testing compaction of a swaged heater for an anode sub-assembly of a Hollow Cathode Assembly (HCA), in which a test sample is cleaned, its mass measured before and after immersion in kerosene for 24 hours, and a compaction percentage calculated. A swaged heater is rejected if the compaction percentage exceeds 84%, plus or minus 4%.

  8. Uncertainties in the Item Parameter Estimates and Robust Automated Test Assembly

    ERIC Educational Resources Information Center

    Veldkamp, Bernard P.; Matteucci, Mariagiulia; de Jong, Martijn G.

    2013-01-01

    Item response theory parameters have to be estimated, and because of the estimation process, they do have uncertainty in them. In most large-scale testing programs, the parameters are stored in item banks, and automated test assembly algorithms are applied to assemble operational test forms. These algorithms treat item parameters as fixed values,…

  9. FUEL ASSEMBLY SHAKER TEST SIMULATION

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Klymyshyn, Nicholas A.; Sanborn, Scott E.; Adkins, Harold E.

    This report describes the modeling of a PWR fuel assembly under dynamic shock loading in support of the Sandia National Laboratories (SNL) shaker test campaign. The focus of the test campaign is on evaluating the response of used fuel to shock and vibration loads that a can occur during highway transport. Modeling began in 2012 using an LS-DYNA fuel assembly model that was first created for modeling impact scenarios. SNL’s proposed test scenario was simulated through analysis and the calculated results helped guide the instrumentation and other aspects of the testing. During FY 2013, the fuel assembly model was refinedmore » to better represent the test surrogate. Analysis of the proposed loads suggested the frequency band needed to be lowered to attempt to excite the lower natural frequencies of the fuel assembly. Despite SNL’s expansion of lower frequency components in their five shock realizations, pretest predictions suggested a very mild dynamic response to the test loading. After testing was completed, one specific shock case was modeled, using recorded accelerometer data to excite the model. Direct comparison of predicted strain in the cladding was made to the recorded strain gauge data. The magnitude of both sets of strain (calculated and recorded) are very low, compared to the expected yield strength of the Zircaloy-4 material. The model was accurate enough to predict that no yielding of the cladding was expected, but its precision at predicting micro strains is questionable. The SNL test data offers some opportunity for validation of the finite element model, but the specific loading conditions of the testing only excite the fuel assembly to respond in a limited manner. For example, the test accelerations were not strong enough to substantially drive the fuel assembly out of contact with the basket. Under this test scenario, the fuel assembly model does a reasonable job of approximating actual fuel assembly response, a claim that can be verified through direct comparison of model results to recorded test results. This does not offer validation for the fuel assembly model in all conceivable cases, such as high kinetic energy shock cases where the fuel assembly might lift off the basket floor to strike to basket ceiling. This type of nonlinear behavior was not witnessed in testing, so the model does not have test data to be validated against.a basis for validation in cases that substantially alter the fuel assembly response range. This leads to a gap in knowledge that is identified through this modeling study. The SNL shaker testing loaded a surrogate fuel assembly with a certain set of artificially-generated time histories. One thing all the shock cases had in common was an elimination of low frequency components, which reduces the rigid body dynamic response of the system. It is not known if the SNL test cases effectively bound all highway transportation scenarios, or if significantly greater rigid body motion than was tested is credible. This knowledge gap could be filled through modeling the vehicle dynamics of a used fuel conveyance, or by collecting acceleration time history data from an actual conveyance under highway conditions.« less

  10. Development of a Cryogenic Thermal Distortion Measurement Facility for Testing the James Webb Space Telescope Instrument Support Integration Module 2-D Test Assemblies

    NASA Technical Reports Server (NTRS)

    Miller, Franklin; Bagdanove, paul; Blake, Peter; Canavan, Ed; Cofie, Emmanuel; Crane, J. Allen; Dominquez, Kareny; Hagopian, John; Johnston, John; Madison, Tim; hide

    2007-01-01

    The James Webb Space Telescope Instrument Support Integration Module (ISIM) is being designed and developed at the Goddard Space Flight Center. The ISM Thermal Distortion Testing (ITDT) program was started with the primary objective to validate the ISM mechanical design process. The ITDT effort seeks to establish confidence and demonstrate the ability to predict thermal distortion in composite structures at cryogenic temperatures using solid element models. This-program's goal is to better ensure that ISIM meets all the mechanical and structural requirements by using test results to verify or improve structural modeling techniques. The first step to accomplish the ITDT objectives was to design, and then construct solid element models of a series 2-D test assemblies that represent critical building blocks of the ISIM structure. Second, the actual test assemblies consisting of composite tubes and invar end fittings were fabricated and tested for thermal distortion. This paper presents the development of the GSFC Cryo Distortion Measurement Facility (CDMF) to meet the requirements of the ISIM 2-D test. assemblies, and other future ISIM testing needs. The CDMF provides efficient cooling with both a single, and two-stage cryo-cooler. Temperature uniformity of the test assemblies during thermal transients and at steady state is accomplished by using sapphire windows for all of the optical ports on the radiation shields and by using .thermal straps to cool the test assemblies. Numerical thermal models of the test assemblies were used to predict the temperature uniformity of the parts during cooldown and at steady state. Results of these models are compared to actual temperature data from the tests. Temperature sensors with a 0.25K precision were used to insure that test assembly gradients did not exceed 2K lateral, and 4K axially. The thermal distortions of two assemblies were measured during six thermal cycles from 320K to 35K using laser interferometers. The standard deviation for all of the distortion measurements is less than 0.5 microns, which falls within the ISIM requirement of 3 microns.

  11. Probe tip heating assembly

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schmitz, Roger William; Oh, Yunje

    A heating assembly configured for use in mechanical testing at a scale of microns or less. The heating assembly includes a probe tip assembly configured for coupling with a transducer of the mechanical testing system. The probe tip assembly includes a probe tip heater system having a heating element, a probe tip coupled with the probe tip heater system, and a heater socket assembly. The heater socket assembly, in one example, includes a yoke and a heater interface that form a socket within the heater socket assembly. The probe tip heater system, coupled with the probe tip, is slidably receivedmore » and clamped within the socket.« less

  12. 42 CFR 84.20 - Examination, inspection, and testing of complete respirator assemblies; fees.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... assemblies; fees. Except as provided in § 84.22, the following fees shall be charged by the Institute for the examination, inspection and testing of complete respirator assemblies: Self-contained breathing apparatus... respirator assemblies; fees. 84.20 Section 84.20 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH...

  13. 42 CFR 84.20 - Examination, inspection, and testing of complete respirator assemblies; fees.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... assemblies; fees. Except as provided in § 84.22, the following fees shall be charged by the Institute for the examination, inspection and testing of complete respirator assemblies: Self-contained breathing apparatus... respirator assemblies; fees. 84.20 Section 84.20 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH...

  14. 42 CFR 84.20 - Examination, inspection, and testing of complete respirator assemblies; fees.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... respirator assemblies; fees. 84.20 Section 84.20 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH... assemblies; fees. Except as provided in § 84.22, the following fees shall be charged by the Institute for the examination, inspection and testing of complete respirator assemblies: Self-contained breathing apparatus...

  15. 42 CFR 84.20 - Examination, inspection, and testing of complete respirator assemblies; fees.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... respirator assemblies; fees. 84.20 Section 84.20 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH... assemblies; fees. Except as provided in § 84.22, the following fees shall be charged by the Institute for the examination, inspection and testing of complete respirator assemblies: Self-contained breathing apparatus...

  16. 42 CFR 84.20 - Examination, inspection, and testing of complete respirator assemblies; fees.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... respirator assemblies; fees. 84.20 Section 84.20 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH... assemblies; fees. Except as provided in § 84.22, the following fees shall be charged by the Institute for the examination, inspection and testing of complete respirator assemblies: Self-contained breathing apparatus...

  17. Internally damped, self-arresting vertical drop-weight impact test apparatus

    NASA Technical Reports Server (NTRS)

    Ambur, Damodar R. (Inventor); Prasad, Chunchu B. (Inventor); Waters, Jr., William A. (Inventor); Stockum, Robert W. (Inventor); Walter, Manfred A. (Inventor)

    1996-01-01

    A vertical dropped-weight impact test machine has a dropped-weight barrel vertically supported on upper and lower support brackets. The dropped-weight barrel is chambered to receive a dropped-weight assembly having a latch pin at its upper end, a damping unit in the middle, and a tup at its lower end. The tup is adapted for gathering data during impact testing. The latch pin releasably engages a latch pin coupling assembly. The latch pin coupling assembly is attached to a winch via a halyard for raising and lowering the dropped-weight assembly. The lower end of the dropped-weight barrel is provided with a bounce-back arresting mechanism which is activated by the descending passage of the dropped-weight assembly. After striking the specimen, the dropped-weight assembly rebounds vertically and is caught by the bounce-back arresting mechanism. The damping unit of the dropped-weight assembly serves to dissipate energy from the rebounding dropped-weight assembly and prevents the dropped-weight assembly from rebounding from the self-arresting mechanism.

  18. Internally damped, self-arresting vertical drop-weight impact test apparatus

    NASA Technical Reports Server (NTRS)

    Ambur, Damodar R. (Inventor); Prasad, Chunchu B. (Inventor); Waters, Jr., William A. (Inventor); Stockum, Robert W. (Inventor); Water, Manfred A. (Inventor)

    1995-01-01

    A vertical dropped-weight impact test machine has a dropped-weight barrel vertically supported on upper and lower support brackets. The dropped-weight barrel is chambered to receive a dropped-weight assembly having a latch pin at its upper end, a damping unit in the middle, and a tup at its lower end. The tup is adapted for gathering data during impact testing. The latch pin releasably engages a latch pin coupling assembly. The latch pin coupling assembly is attached to a winch via a halyard for raising and lowering the dropped-weight assembly. The lower end of the dropped-weight barrel is provided with a bounce-back arresting mechanism which is activated by the descending passage of the dropped-weight assembly. After striking the specimen, the dropped-weight assembly rebounds vertically and is caught by the bounce-back arresting mechanism. The damping unit of the dropped-weight assembly serves to dissipate energy from the rebounding dropped-weight assembly and prevents the dropped-weight assembly from rebounding from the self-arresting mechanism.

  19. Robotic space construction

    NASA Technical Reports Server (NTRS)

    Mixon, Randolph W.; Hankins, Walter W., III; Wise, Marion A.

    1988-01-01

    Research at Langley AFB concerning automated space assembly is reviewed, including a Space Shuttle experiment to test astronaut ability to assemble a repetitive truss structure, testing the use of teleoperated manipulators to construct the Assembly Concept for Construction of Erectable Space Structures I truss, and assessment of the basic characteristics of manipulator assembly operations. Other research topics include the simultaneous coordinated control of dual-arm manipulators and the automated assembly of candidate Space Station trusses. Consideration is given to the construction of an Automated Space Assembly Laboratory to study and develop the algorithms, procedures, special purpose hardware, and processes needed for automated truss assembly.

  20. iLIDS Simulations and Videos for Docking TIM

    NASA Technical Reports Server (NTRS)

    Lewis, James L.

    2010-01-01

    The video shows various aspects of the International Low Impact Docking System, including team members, some production, configuration, mated androgynous iLIDS, SCS Lockdown system, thermal analysis, electrical engineering aspects, the iLIDS control box and emulator, radiation testing at BNL, component environmental testing, component vibration testing, 3G processor board delivery system, GTA vibe test, EMA testbed, hook and hook disassembly, flex shaftdrive assembly, GSE cradle MISSE-6 Columbus, MISSE 6 and 7 seal experiments, actuated full scale seal test rig, LIDS on Hubble, dynamics test prep, EDU 54 mass emulation and SCS, load ring characterization, 6DOF proof test, SCS at 6DOF, machining EEMS and inner ring assembly, APAS assembly, inner ring fitting, rotation stand assembly, EEMS mating, and EEMS proof of concept demonstration.

  1. Cryogenic Optical Performance of a Light-weight Mirror Assembly for Future Space Astronomical Telescopes: Optical Test Results and Thermal Optical Model

    NASA Technical Reports Server (NTRS)

    Eng, Ron; Arnold, William; Baker, Markus A.; Bevan, Ryan M.; Carpenter, James R.; Effinger, Michael R.; Gaddy, Darrell E.; Goode, Brian K.; Kegley, Jeffrey R.; Hogue, William D.; hide

    2013-01-01

    A 40 cm diameter mirror assembly was interferometrically tested at room temperature down to 250 degrees Kelvin for thermal deformation. The 2.5 m radius of curvature spherical mirror assembly was constructed by low temperature fusing three abrasive waterjet core sections between two face sheets. The 93% lightweighted Corning ULE mirror assembly represents the current state of the art for future UV, optical, near IR space telescopes. During the multiple thermal test cycles, test results of interferometric test, thermal IR images of the front face were recorded in order to validate thermal optical model.

  2. Assembly Test Article (ATA)

    NASA Technical Reports Server (NTRS)

    Ricks, Glen A.

    1988-01-01

    The assembly test article (ATA) consisted of two live loaded redesigned solid rocket motor (RSRM) segments which were assembled and disassembled to simulate the actual flight segment stacking process. The test assembly joint was flight RSRM design, which included the J-joint insulation design and metal capture feature. The ATA test was performed mid-November through 24 December 1987, at Kennedy Space Center (KSC), Florida. The purpose of the test was: certification that vertical RSRM segment mating and separation could be accomplished without any damage; verification and modification of the procedures in the segment stacking/destacking documents; and certification of various GSE to be used for flight assembly and inspection. The RSRM vertical segment assembly/disassembly is possible without any damage to the insulation, metal parts, or seals. The insulation J-joint contact area was very close to the predicted values. Numerous deviations and changes to the planning documents were made to ensure the flight segments are effectively and correctly stacked. Various GSE were also certified for use on flight segments, and are discussed in detail.

  3. Characterization of the Twelve Channel 100/140 Micron Optical Fiber, Ribbon Cable and MTP Array Connector Assembly for Space Flight Environments

    NASA Technical Reports Server (NTRS)

    Ott, Melanie N.; Macmurphy, Shawn; Friedberg, Patricia; Day, John H. (Technical Monitor)

    2002-01-01

    Presented here is the second set of testing conducted by the Technology Validation Laboratory for Photonics at NASA Goddard Space Flight Center on the 12 optical fiber ribbon cable with MTP array connector for space flight environments. In the first set of testing the commercial 62.5/125 cable assembly was characterized using space flight parameters. The testing showed that the cable assembly would survive a typical space flight mission with the exception of a vacuum environment. Two enhancements were conducted to the existing technology to better suit the vacuum environment as well as the existing optoelectronics and increase the reliability of the assembly during vibration. The MTP assembly characterized here has a 100/140 optical commercial fiber and non outgassing connector and cable components. The characterization for this enhanced fiber optic cable assembly involved vibration, thermal and radiation testing. The data and results of this characterization study are presented which include optical in-situ testing.

  4. 76 FR 19468 - Amended Certification Regarding Eligibility To Apply for Worker Adjustment Assistance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-07

    ... Known As ATW Automation, Inc., Livonia Michigan TA-W-72,075A Assembly & Test Worldwide, Inc., Currently... Saginaw, Michigan locations of Assembly & Test Worldwide, Inc., are currently known as ATW Automation, Inc... Automation, Inc., Livonia, Michigan (TA-W-72,075); Assembly & Test Worldwide, Inc., currently known as ATW...

  5. Using Set Covering with Item Sampling to Analyze the Infeasibility of Linear Programming Test Assembly Models

    ERIC Educational Resources Information Center

    Huitzing, Hiddo A.

    2004-01-01

    This article shows how set covering with item sampling (SCIS) methods can be used in the analysis and preanalysis of linear programming models for test assembly (LPTA). LPTA models can construct tests, fulfilling a set of constraints set by the test assembler. Sometimes, no solution to the LPTA model exists. The model is then said to be…

  6. Coaxial test fixture

    DOEpatents

    Praeg, Walter F.

    1986-01-01

    An assembly is provided for testing one or more contact material samples in a vacuum environment. The samples are positioned as an inner conductive cylinder assembly which is mounted for reciprocal vertical motion as well as deflection from a vertical axis. An outer conductive cylinder is coaxially positioned around the inner cylinder and test specimen to provide a vacuum enclosure therefor. A power source needed to drive test currents through the test specimens is connected to the bottom of each conductive cylinder, through two specially formed conductive plates. The plates are similar in form, having a plurality of equal resistance current paths connecting the power source to a central connecting ring. The connecting rings are secured to the bottom of the inner conductive assembly and the outer cylinder, respectively. A hydraulic actuator is also connected to the bottom of the inner conductor assembly to adjust the pressure applied to the test specimens during testing. The test assembly controls magnetic forces such that the current distribution through the test samples is symmetrical and that contact pressure is not reduced or otherwise disturbed.

  7. Design, manufacture, and test of coolant pump-motor assembly for Brayton power conversion system

    NASA Technical Reports Server (NTRS)

    Gabacz, L. E.

    1973-01-01

    The design, development, fabrication, and testing of seven coolant circulating pump-motor assemblies are discussed. The pump-motor assembly is driven by the nominal 44.4-volt, 400-Hz, 3-phase output of a nominal 56-volt dc input inverter. The pump-motor assembly will be used to circulate Dow Corning 200 liquid coolant for use in a Brayton cycle space power system. The pump-motor assembly develops a nominal head of 70 psi at 3.7 gpm with an over-all efficiency of 26 percent. The design description, drawings, photographs, reliability results, and developmental and acceptance test results are included.

  8. Advanced Stirling Radioisotope Generator Engineering Unit 2 (ASRG EU2) Final Assembly

    NASA Technical Reports Server (NTRS)

    Oriti, Salvatore M.

    2015-01-01

    NASA Glenn Research Center (GRC) has recently completed the assembly of a unique Stirling generator test article for laboratory experimentation. Under the Advanced Stirling Radioisotope Generator (ASRG) flight development contract, NASA GRC initiated a task to design and fabricate a flight-like generator for in-house testing. This test article was given the name ASRG Engineering Unit 2 (EU2) as it was effectively the second engineering unit to be built within the ASRG project. The intent of the test article was to duplicate Lockheed Martin's qualification unit ASRG design as much as possible to enable system-level tests not previously possible at GRC. After the cancellation of the ASRG flight development project, the decision was made to continue the EU2 build, and make use of a portion of the hardware from the flight development project. GRC and Lockheed Martin engineers collaborated to develop assembly procedures, leveraging the valuable knowledge gathered by Lockheed Martin during the ASRG development contract. The ASRG EU2 was then assembled per these procedures at GRC with Lockheed Martin engineers on site. The assembly was completed in August 2014. This paper details the components that were used for the assembly, and the assembly process itself.

  9. 16 CFR Figure 1 to Part 1633 - Test Assembly, Shown in Furniture Calorimeter (Configuration A)

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 16 Commercial Practices 2 2014-01-01 2014-01-01 false Test Assembly, Shown in Furniture Calorimeter (Configuration A) 1 Figure 1 to Part 1633 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION.... 1 Figure 1 to Part 1633—Test Assembly, Shown in Furniture Calorimeter (Configuration A) ER15MR06.000 ...

  10. 16 CFR Figure 1 to Part 1633 - Test Assembly, Shown in Furniture Calorimeter (Configuration A)

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 16 Commercial Practices 2 2011-01-01 2011-01-01 false Test Assembly, Shown in Furniture Calorimeter (Configuration A) 1 Figure 1 to Part 1633 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION.... 1 Figure 1 to Part 1633—Test Assembly, Shown in Furniture Calorimeter (Configuration A) ER15MR06.000 ...

  11. 16 CFR Figure 1 to Part 1633 - Test Assembly, Shown in Furniture Calorimeter (Configuration A)

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Test Assembly, Shown in Furniture Calorimeter (Configuration A) 1 Figure 1 to Part 1633 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION.... 1 Figure 1 to Part 1633—Test Assembly, Shown in Furniture Calorimeter (Configuration A) ER15MR06.000 ...

  12. 16 CFR Figure 1 to Part 1633 - Test Assembly, Shown in Furniture Calorimeter (Configuration A)

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 16 Commercial Practices 2 2012-01-01 2012-01-01 false Test Assembly, Shown in Furniture Calorimeter (Configuration A) 1 Figure 1 to Part 1633 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION.... 1 Figure 1 to Part 1633—Test Assembly, Shown in Furniture Calorimeter (Configuration A) ER15MR06.000 ...

  13. Heat release from wood wall assemblies using oxygen consumption method

    Treesearch

    Hao C. Tran; Robert E. White

    1990-01-01

    The concept of heat release rate is gaining acceptance in the evaluation of fire performance of materials and assemblies. However, this concept has not been incorporated into fire endurance testing such as the ASTM E-119 test method. Heat release rate of assemblies can be useful in determining the time at which the assemblies start to contribute to the controlled fire...

  14. Mobile work station concept for assembly of large space structures (zero gravity simulation tests)

    NASA Astrophysics Data System (ADS)

    Heard, W. L., Jr.; Bush, H. G.; Wallsom, R. E.; Jensen, J. K.

    1982-03-01

    The concept presented is intended to enhance astronaut assembly of truss structure that is either too large or complex to fold for efficient Shuttle delivery to orbit. The potential of augmented astronaut assembly is illustrated by applying the result of the tests to a barebones assembly of a truss structure. If this structure were assembled from the same nestable struts that were used in the Mobile Work Station assembly tests, the spacecraft would be 55 meters in diameter and consist of about 500 struts. The struts could be packaged in less than 1/2% of the Shuttle cargo bay volume and would take up approximately 3% of the mass lift capability. They could be assembled in approximately four hours. This assembly concept for erectable structures is not only feasible, but could be used to significant economic advantage by permitting the superior packaging feature of erectable structures to be exploited and thereby reduce expensive Shuttle delivery flights.

  15. Mobile work station concept for assembly of large space structures (zero gravity simulation tests)

    NASA Technical Reports Server (NTRS)

    Heard, W. L., Jr.; Bush, H. G.; Wallsom, R. E.; Jensen, J. K.

    1982-01-01

    The concept presented is intended to enhance astronaut assembly of truss structure that is either too large or complex to fold for efficient Shuttle delivery to orbit. The potential of augmented astronaut assembly is illustrated by applying the result of the tests to a barebones assembly of a truss structure. If this structure were assembled from the same nestable struts that were used in the Mobile Work Station assembly tests, the spacecraft would be 55 meters in diameter and consist of about 500 struts. The struts could be packaged in less than 1/2% of the Shuttle cargo bay volume and would take up approximately 3% of the mass lift capability. They could be assembled in approximately four hours. This assembly concept for erectable structures is not only feasible, but could be used to significant economic advantage by permitting the superior packaging feature of erectable structures to be exploited and thereby reduce expensive Shuttle delivery flights.

  16. 14. VIEW TO WESTSOUTHWEST ACROSS CAR TEST TRACT SITE TO ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. VIEW TO WEST-SOUTHWEST ACROSS CAR TEST TRACT SITE TO NORTH END OF ASSEMBLY PLANT, SHOWING NORTH END ADDITIONS. - Ford Motor Company Long Beach Assembly Plant, Assembly Building, 700 Henry Ford Avenue, Long Beach, Los Angeles County, CA

  17. A mobile work station concept for mechanically aided astronaut assembly of large space trusses

    NASA Technical Reports Server (NTRS)

    Heard, W. L., Jr.; Bush, H. G.; Wallson, R. E.; Jensen, J. K.

    1983-01-01

    This report presents results of a series of truss assembly tests conducted to evaluate a mobile work station concept intended to mechanically assist astronaut manual assembly of erectable space trusses. The tests involved assembly of a tetrahedral truss beam by a pair of test subjects with and without pressure (space) suits, both in Earth gravity and in simulated zero gravity (neutral buoyancy in water). The beam was assembled from 38 identical graphite-epoxy nestable struts, 5.4 m in length with aluminum quick-attachment structural joints. Struts and joints were designed to closely simulate flight hardware. The assembled beam was approximately 16.5 m long and 4.5 m on each of the four sides of its diamond-shaped cross section. The results show that average in-space assembly rates of approximately 38 seconds per strut can be expected for struts of comparable size. This result is virtually independent of the overall size of the structure being assembled. The mobile work station concept would improve astronaut efficiency for on-orbit manual assembly of truss structures, and also this assembly-line method is highly competitive with other construction methods being considered for large space structures.

  18. Gasoline-Engine Assembler (engine & turbine) 806.781; Internal-Combustion-Engine-Assembler (engine & turbine) 806.781; Outboard-Motor Assembler (engine & turbine) 806.781--Technical Report on Development of USTES Aptitude Test Battery.

    ERIC Educational Resources Information Center

    Manpower Administration (DOL), Washington, DC. U.S. Training and Employment Service.

    The United States Training and Employment Service General Aptitude Test Battery (GATB), first published in 1947, has been included in a continuing program of research to validate the tests against success in many different occupations. The GATB consists of 12 tests which measure nine aptitudes: General Learning Ability; Verbal Aptitude; Numerical…

  19. The SLS Stages Intertank Structural Test Assembly (STA) arrives at MSFC.

    NASA Image and Video Library

    2018-03-06

    The SLS Stages Intertank Structural Test Assembly (STA) is rolling off the NASA Pegasus Barge at the MSFC Dock enroute to the MSFC 4619 Load Test Annex test facility for qualification testing. STA emerges from Barge Pegasus.

  20. Results of EVA/mobile transporter space station truss assembly tests

    NASA Technical Reports Server (NTRS)

    Watson, Judith J.; Heard, Walter L., Jr.; Bush, Harold G.; Lake, M. S.; Jensen, J. K.; Wallsom, R. E.; Phelps, J. E.

    1988-01-01

    Underwater neutral buoyance tests were conducted to evaluate the use of a Mobile Transporter concept in conjunction with EVA astronauts to construct the Space Station Freedom truss structure. A three-bay orthogonal tetrahedral truss configuration with a 15 foot square cross section was repeatedly assembled by a single pair of pressure suited test subjects working from the Mobile Transporter astronaut positioning devices (mobile foot restraints). The average unit assembly time (which included integrated installation of utility trays) was 27.6 s/strut, or 6 min/bay. The results of these tests indicate that EVA assembly of space station size structures can be significantly enhanced when using a Mobile Transporter equipped with astronaut positioning devices. Rapid assembly time can be expected and are dependent primarily on the rate of translation permissible for on-orbit operations. The concept used to demonstate integrated installation of utility trays requires minimal EVA handling and consequentially, as the results show, has little impact on overall assembly time.

  1. Verification Test of Automated Robotic Assembly of Space Truss Structures

    NASA Technical Reports Server (NTRS)

    Rhodes, Marvin D.; Will, Ralph W.; Quach, Cuong C.

    1995-01-01

    A multidisciplinary program has been conducted at the Langley Research Center to develop operational procedures for supervised autonomous assembly of truss structures suitable for large-aperture antennas. The hardware and operations required to assemble a 102-member tetrahedral truss and attach 12 hexagonal panels were developed and evaluated. A brute-force automation approach was used to develop baseline assembly hardware and software techniques. However, as the system matured and operations were proven, upgrades were incorporated and assessed against the baseline test results. These upgrades included the use of distributed microprocessors to control dedicated end-effector operations, machine vision guidance for strut installation, and the use of an expert system-based executive-control program. This paper summarizes the developmental phases of the program, the results of several assembly tests, and a series of proposed enhancements. No problems that would preclude automated in-space assembly or truss structures have been encountered. The test system was developed at a breadboard level and continued development at an enhanced level is warranted.

  2. Development and verification testing of automation and robotics for assembly of space structures

    NASA Technical Reports Server (NTRS)

    Rhodes, Marvin D.; Will, Ralph W.; Quach, Cuong C.

    1993-01-01

    A program was initiated within the past several years to develop operational procedures for automated assembly of truss structures suitable for large-aperture antennas. The assembly operations require the use of a robotic manipulator and are based on the principle of supervised autonomy to minimize crew resources. A hardware testbed was established to support development and evaluation testing. A brute-force automation approach was used to develop the baseline assembly hardware and software techniques. As the system matured and an operation was proven, upgrades were incorprated and assessed against the baseline test results. This paper summarizes the developmental phases of the program, the results of several assembly tests, the current status, and a series of proposed developments for additional hardware and software control capability. No problems that would preclude automated in-space assembly of truss structures have been encountered. The current system was developed at a breadboard level and continued development at an enhanced level is warranted.

  3. The advanced receiver 2: Telemetry test results in CTA 21

    NASA Technical Reports Server (NTRS)

    Hinedi, S.; Bevan, R.; Marina, M.

    1991-01-01

    Telemetry tests with the Advanced Receiver II (ARX II) in Compatibility Test Area 21 are described. The ARX II was operated in parallel with a Block-III Receiver/baseband processor assembly combination (BLK-III/BPA) and a Block III Receiver/subcarrier demodulation assembly/symbol synchronization assembly combination (BLK-III/SDA/SSA). The telemetry simulator assembly provided the test signal for all three configurations, and the symbol signal to noise ratio as well as the symbol error rates were measured and compared. Furthermore, bit error rates were also measured by the system performance test computer for all three systems. Results indicate that the ARX-II telemetry performance is comparable and sometimes superior to the BLK-III/BPA and BLK-III/SDA/SSA combinations.

  4. The NIRspec assembly integration and test status

    NASA Astrophysics Data System (ADS)

    Wettemann, Thomas; Ehrenwinkler, Ralf; Johnson, Thomas E.; Maschmann, Marc; Mosner, Peter; te Plate, Maurice; Rödel, Andreas

    2017-11-01

    The Near-Infrared Spectrograph (NIRSpec) is one of the four instruments on the James Webb Space Telescope (JWST) scheduled for launch in 2018. NIRSpec has been manufactured and tested by an European industrial consortium led by Airbus Defence and Space and delivered to the European Space Agency (ESA) and NASA in September 2013. Since then it has successfully been integrated into the JWST Integrated Science Instrument Module (ISIM) and is currently in ISIM Cryo-Vacuum Test#2. Since however two of its most important assemblies, the Focal Plane Assembly (FPA) and the Micro-Shutter Assembly (MSA) need to be replaced by new units we will present the status of the instrument, the status of its new flight assemblies in manufacturing and testing and give an outlook on the planned exchange activities and the following instrument re-verification.

  5. The SLS Stages Intertank Structural Test Assembly (STA) arrives at MSFC

    NASA Image and Video Library

    2018-03-08

    The SLS Stages Intertank Structural Test Assembly (STA) is rolling off the NASA Pegasus Barge at the MSFC Dock enroute to the MSFC 4619 Load Test Annex test facility for qualification testing via MSFC West Test Area. STA approaches Test Stand 4693, SLS LH2 test Stand, on way to Bldg. 4619

  6. Combustion Stability of the Gas Generator Assembly from J-2X Engine E10001 and Powerpack Tests

    NASA Technical Reports Server (NTRS)

    Hulka, J. R.; Kenny, R. L.; Casiano, M. J.

    2013-01-01

    Testing of a powerpack configuration (turbomachinery and gas generator assembly) and the first complete engine system of the liquid oxygen/liquid hydrogen propellant J-2X rocket engine have been completed at the NASA Stennis Space Center. The combustion stability characteristics of the gas generator assemblies on these two systems are of interest for reporting since considerable effort was expended to eliminate combustion instability during early development of the gas generator assembly with workhorse hardware. Comparing the final workhorse gas generator assembly development test data to the powerpack and engine system test data provides an opportunity to investigate how the nearly identical configurations of gas generator assemblies operate with two very different propellant supply systems one the autonomous pressure-fed test configuration on the workhorse development test stand, the other the pump-fed configurations on the powerpack and engine systems. The development of the gas generator assembly and the elimination of the combustion instability on the pressure-fed workhorse test stand have been reported extensively in the two previous Liquid Propulsion Subcommittee meetings 1-7. The powerpack and engine system testing have been conducted from mid-2011 through 2012. All tests of the powerpack and engine system gas generator systems to date have been stable. However, measureable dynamic behavior, similar to that observed on the pressure-fed test stand and reported in Ref. [6] and attributed to an injection-coupled response, has appeared in both powerpack and engine system tests. As discussed in Ref. [6], these injection-coupled responses are influenced by the interaction of the combustion chamber with a branch pipe in the hot gas duct that supplies gaseous helium to pre-spin the turbine during the start transient. This paper presents the powerpack and engine system gas generator test data, compares these data to the development test data, and provides additional combustion stability analyses of the configurations.

  7. EVA assembly of large space structure element

    NASA Technical Reports Server (NTRS)

    Bement, L. J.; Bush, H. G.; Heard, W. L., Jr.; Stokes, J. W., Jr.

    1981-01-01

    The results of a test program to assess the potential of manned extravehicular activity (EVA) assembly of erectable space trusses are described. Seventeen tests were conducted in which six "space-weight" columns were assembled into a regular tetrahedral cell by a team of two "space"-suited test subjects. This cell represents the fundamental "element" of a tetrahedral truss structure. The tests were conducted under simulated zero-gravity conditions. Both manual and simulated remote manipulator system modes were evaluated. Articulation limits of the pressure suit and zero gravity could be accommodated by work stations with foot restraints. The results of this study have confirmed that astronaut EVA assembly of large, erectable space structures is well within man's capabilities.

  8. Thermodynamic performance testing of the orbiter flash evaporator system

    NASA Technical Reports Server (NTRS)

    Jaax, J. R.; Melgares, M. A.; Frahm, J. P.

    1980-01-01

    System level testing of the space shuttle orbiter's development flash evaporator system (FES) was performed in a thermal vacuum chamber capable of simulating ambient ascent, orbital, and entry temperature and pressure profiles. The test article included the evaporator assembly, high load and topping exhaust duct and nozzle assemblies, and feedwater supply assembly. Steady state and transient heat load, water pressure/temperature and ambient pressure/temperature profiles were imposed by especially designed supporting test hardware. Testing in 1978 verified evaporator and duct heater thermal design, determined FES performance boundaries, and assessed topping evaporator plume characteristics. Testing in 1979 combined the FES with the other systems in the orbiter active thermal control subsystem (ATCS). The FES met or exceeded all nominal and contingency performance requirements during operation with the integrated ATCS. During both tests stability problems were encountered during steady state operations which resulted in subsequent design changes to the water spray nozzle and valve plate assemblies.

  9. Katome: de novo DNA assembler implemented in rust

    NASA Astrophysics Data System (ADS)

    Neumann, Łukasz; Nowak, Robert M.; Kuśmirek, Wiktor

    2017-08-01

    Katome is a new de novo sequence assembler written in the Rust programming language, designed with respect to future parallelization of the algorithms, run time and memory usage optimization. The application uses new algorithms for the correct assembly of repetitive sequences. Performance and quality tests were performed on various data, comparing the new application to `dnaasm', `ABySS' and `Velvet' genome assemblers. Quality tests indicate that the new assembler creates more contigs than well-established solutions, but the contigs have better quality with regard to mismatches per 100kbp and indels per 100kbp. Additionally, benchmarks indicate that the Rust-based implementation outperforms `dnaasm', `ABySS' and `Velvet' assemblers, written in C++, in terms of assembly time. Lower memory usage in comparison to `dnaasm' is observed.

  10. Confirmatory Test of the Irritant Gas Disperser, Helicopter- or Vehicle- Mounted, M5

    DTIC Science & Technology

    1962-07-23

    disperser consists of four major assemblies: An agent-container assembly, a pressure - group assembly, a support assembly, and a throat assembly. (1) The...base. (2) The pressure - group assembly consists of two steel high-pressure tanks, secured by steel band clamps to the pressure - group support assembly...aluminum alloy tubing welded together to provide a support for the agent-container assembly and the pressure - group assembly. Each of these separate

  11. Adapter assembly prevents damage to tubing during high pressure tests

    NASA Technical Reports Server (NTRS)

    Stinett, L. L.

    1965-01-01

    Portable adapter assembly prevents damage to tubing and injury to personnel when pressurizing a system or during high pressure tests. The assembly is capable of withstanding high pressure. It is securely attached to the tubing stub end and may be removed without brazing, cutting or cleaning the tube.

  12. Electromagnetic compatibility test report for the tethered satellite data acquisition and control assembly

    NASA Astrophysics Data System (ADS)

    Hoskins, Douglas; Snead, Robert

    1988-05-01

    This report details the results of an electromagnetic compatibility test on the SCI Systems Data Acquisition and Control Assembly (DACA). This assembly is an electronic processor which controls the central communication link from the Tethered Satellite System (TSS) to the Space Transportation System Orbiter Space Shuttle.

  13. Analysis and Design of a Double-Divert Spiral Groove Seal

    NASA Technical Reports Server (NTRS)

    Zheng, Xiaoqing; Berard, Gerald

    2007-01-01

    This viewgraph presentation describes the design and analysis of a double spiral groove seal. The contents include: 1) Double Spiral Design Features; 2) Double Spiral Operational Features; 3) Mating Ring/Rotor Assembly; 4) Seal Ring Assembly; 5) Insert Segment Joints; 6) Rotor Assembly Completed Prototype Parts; 7) Seal Assembly Completed Prototype Parts; 8) Finite Element Analysis; 9) Computational Fluid Dynamics (CFD) Analysis; 10) Restrictive Orifice Design; 11) Orifice CFD Model; 12) Orifice Results; 13) Restrictive Orifice; 14) Seal Face Coning; 15) Permanent Magnet Analysis; 16) Magnetic Repulsive Force; 17) Magnetic Repulsive Test Results; 18) Spin Testing; and 19) Testing and Validation.

  14. The AXAF technology mirror assembly program - An overview

    NASA Technical Reports Server (NTRS)

    Wyman, Charles L.; Dailey, Carroll C.; Reily, Cary; Weisskopf, Martin; Mckinnon, Phil

    1986-01-01

    The manufacture and testing of the Technology Mirror Assembly (TMA), a prototype Wolter I telescope scaled to the dimensions of the innermost element of the High-Resolution Mirror Assembly for the NASA Advanced X-ray Astrophysics Facility (AXAF), are reviewed. Consideration is given to the grinding, polishing, coating, and assembly of the zerodur TMA blanks, the TMA mount design, and the test procedures used at the MSFC X-ray Calibration Facility. Test results indicate FWHM resolution less than 0.5 arcsec, but with significant near-field scattering attributed to ripple; further long-lap polishing is suggested.

  15. The SLS Stages Intertank Structural Test Assembly (STA) arrives at MSFC

    NASA Image and Video Library

    2018-03-06

    The SLS Stages Intertank Structural Test Assembly (STA) is rolling off the NASA Pegasus Barge at the MSFC Dock enroute to the MSFC 4619 Load Test Annex test facility for qualification testing. STA hardware completely free of barge and flanked by tug boats.

  16. A mobile transporter concept for EVA assembly of future spacecraft

    NASA Technical Reports Server (NTRS)

    Watson, Judith J.; Bush, Harold G.; Heard, Walter L., Jr.; Lake, Mark S.; Jensen, J. Kermit

    1990-01-01

    This paper details the ground test program for the NASA Langley Research Center Mobile Transporter concept. The Mobile Transporter would assist EVA astronauts in the assembly of the Space Station Freedom. 1-g and simulated O-g (neutral buoyancy) tests were conducted to evaluate the use of the Mobile Transporter. A three-bay (44 struts) orthogonal tetrahedral truss configuration with a 15-foot-square cross section was repeatedly assembled by a single pair of pressure suited test subjects working from the Mobile Transporter astronaut positioning devices. The average unit assembly time was 28 seconds/strut. The results of these tests indicate that the use of a Mobile Transporter for EVA assembly of Space Station size structure is viable and practical. Additionally, the Mobile Transporter could be used to construct other spacecraft such as the submillimeter astronomical laboratory, space crane, and interplanetary (i.e., Mars and lunar) spacecraft.

  17. The effect of 17-4PH stainless steel on the lifetime of a Pennzane lubricated Microwave Limb Sounder Antenna Actuator Assembly ball screw for the AURA spacecraft

    NASA Astrophysics Data System (ADS)

    Jones, William R., Jr.; Jansen, Mark J.; Chen, Gun-Shing; Lam, Jonathan; Balzer, Mark; Lo, John; Anderson, Mark; Schepis, Joseph P.

    2005-07-01

    During ground based life testing of a Microwave Limb Sounder (MLS) Antenna Actuator Assembly (AAA) ball-screw assembly, lubricant darkening and loss were noted when approximately 10% of required lifetime was completed. The MLS-AAA ball screw and nut are made from 17-4 PH steel, the nut has 440C stainless steel balls, and the assembly is lubricated with a Pennzane formulation containing a three weight percent lead naphthenate additive. Life tests were done in dry nitrogen at 50°C. To investigate the MLS-AAA life test anomaly, Spiral Orbit Tribometer (SOT) accelerated tests were performed. SOT results indicated greatly reduced relative lifetimes of Pennzane formulations in contact with 17-4 PH steel compared to 440C stainless steel. Also, dry nitrogen tests yielded longer relative lifetimes than comparable ultrahigh vacuum tests. Generally, oxidized Pennzane formulations yielded shorter lifetimes than non-oxidized lubricant. This study emphasizes surface chemistry effects on the lubricated lifetime of moving mechanical assemblies.

  18. The Effect of 17-4 PH Stainless Steel on the Lifetime of a Pennzane(Trademark) Lubricated Microwave Limb Sounder Antenna Actuator Assembly Ball Screw for the AURA Spacecraft

    NASA Technical Reports Server (NTRS)

    Jones, William R., Jr.; Jansen, Mark J.; Chen, Gun-Shing; Lam, Jonathan; Balzer, Mark; Anderson, Mark; Lo, John; Schepis, Joseph P.

    2005-01-01

    During ground based life testing of a Microwave Limb Sounder (MLS) Antenna Actuator Assembly (AAA) ball-screw assembly, lubricant darkening and loss were noted when approximately 10 percent of required lifetime was completed. The MLS-AAA ball screw and nut are made from 17-4 PH steel, the nut has 440C stainless steel balls, and the assembly is lubricated with a Pennzane formulation containing a three weight percent lead naphthenate additive. Life tests were done in dry nitrogen at 50 C. To investigate the MLS-AAA life test anomaly, Spiral Orbit Tribometer (SOT) accelerated tests were performed. SOT results indicated greatly reduced relative lifetimes of Pennzane formulations in contact with 17-4 PH steel compared to 440C stainless steel. Also, dry nitrogen tests yielded longer relative lifetimes than comparable ultrahigh vacuum tests. Generally, oxidized Pennzane formulations yielded shorter lifetimes than non-oxidized lubricant. This study emphasizes surface chemistry effects on the lubricated lifetime of moving mechanical assemblies.

  19. A Testlet Assembly Design for Adaptive Multistage Tests

    ERIC Educational Resources Information Center

    Luecht, Richard; Brumfield, Terry; Breithaupt, Krista

    2006-01-01

    This article describes multistage tests and some practical test development considerations related to the design and implementation of a multistage test, using the Uniform CPA (certified public accountant) Examination as a case study. The article further discusses the use of automated test assembly procedures in an operational context to produce…

  20. The SLS Stages Intertank Structural Test Assembly (STA) arrives at MSFC

    NASA Image and Video Library

    2018-03-08

    The SLS Stages Intertank Structural Test Assembly (STA) is rolling off the NASA Pegasus Barge at the MSFC Dock enroute to the MSFC 4619 Load Test Annex test facility for qualification testing via MSFC West Test Area. Historic Saturn 1-C test stand on far left, blockhouse 4670 on far right, SLS LH2 test stand, 4693, in center.

  1. The SLS Stages Intertank Structural Test Assembly (STA) arrives at MSFC

    NASA Image and Video Library

    2018-03-08

    The SLS Stages Intertank Structural Test Assembly (STA) is rolling off the NASA Pegasus Barge at the MSFC Dock enroute to the MSFC 4619 Load Test Annex test facility for qualification testing via MSFC West Test Area. STA enters West Test Area from intersection of Dodd and Saturn roads. Onlookers take photos with Historic Dynamic Test Stand in background.

  2. Multiparameter vision testing apparatus

    NASA Technical Reports Server (NTRS)

    Hunt, S. R., Jr.; Homkes, R. J.; Poteate, W. B.; Sturgis, A. C. (Inventor)

    1975-01-01

    Compact vision testing apparatus is described for testing a large number of physiological characteristics of the eyes and visual system of a human subject. The head of the subject is inserted into a viewing port at one end of a light-tight housing containing various optical assemblies. Visual acuity and other refractive characteristics and ocular muscle balance characteristics of the eyes of the subject are tested by means of a retractable phoroptor assembly carried near the viewing port and a film cassette unit carried in the rearward portion of the housing (the latter selectively providing a variety of different visual targets which are viewed through the optical system of the phoroptor assembly). The visual dark adaptation characteristics and absolute brightness threshold of the subject are tested by means of a projector assembly which selectively projects one or both of a variable intensity fixation target and a variable intensity adaptation test field onto a viewing screen located near the top of the housing.

  3. Flip-chip assembly and reliability using gold/tin solder bumps

    NASA Astrophysics Data System (ADS)

    Oppermann, Hermann; Hutter, Matthias; Klein, Matthias; Reichl, Herbert

    2004-09-01

    Au/Sn solder bumps are commonly used for flip chip assembly of optoelectronic and RF devices. They allow a fluxless assembly which is required to avoid contamination at optical interfaces. Flip chip assembly experiments were carried out using as plated Au/Sn bumps without prior bump reflow. An RF and reliability test vehicles comprise a GaAs chip which was flip chip soldered on a silicon substrate. Temperature cycling tests with and without underfiller were performed and the results are presented. The different failure modes for underfilled and non-underfilled samples were discussed and compared. Additional reliability tests were performed with flip chip bonding by gold thermocompression for comparison. The test results and the failure modes are discussed in detail.

  4. 49 CFR 572.192 - Head assembly.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Head assembly. 572.192 Section 572.192... Test Dummy, Small Adult Female § 572.192 Head assembly. (a) The head assembly consists of the head (180...) of this section, the head assembly shall meet performance requirements specified in paragraph (c) of...

  5. 49 CFR 572.182 - Head assembly.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Head assembly. 572.182 Section 572.182... Test Dummy, 50th Percentile Adult Male § 572.182 Head assembly. (a) The head assembly consists of the..., the head assembly shall meet performance requirements specified in paragraph (c) of this section. (b...

  6. 49 CFR 572.182 - Head assembly.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Head assembly. 572.182 Section 572.182... Dummy, 50th Percentile Adult Male § 572.182 Head assembly. (a) The head assembly consists of the head... assembly shall meet performance requirements specified in paragraph (c) of this section. (b) Test procedure...

  7. 49 CFR 572.182 - Head assembly.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 7 2011-10-01 2011-10-01 false Head assembly. 572.182 Section 572.182... Dummy, 50th Percentile Adult Male § 572.182 Head assembly. (a) The head assembly consists of the head... assembly shall meet performance requirements specified in paragraph (c) of this section. (b) Test procedure...

  8. 49 CFR 572.192 - Head assembly.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Head assembly. 572.192 Section 572.192... Test Dummy, Small Adult Female § 572.192 Head assembly. (a) The head assembly consists of the head (180...) of this section, the head assembly shall meet performance requirements specified in paragraph (c) of...

  9. 49 CFR 572.182 - Head assembly.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Head assembly. 572.182 Section 572.182... Dummy, 50th Percentile Adult Male § 572.182 Head assembly. (a) The head assembly consists of the head... assembly shall meet performance requirements specified in paragraph (c) of this section. (b) Test procedure...

  10. 49 CFR 572.182 - Head assembly.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Head assembly. 572.182 Section 572.182... Test Dummy, 50th Percentile Adult Male § 572.182 Head assembly. (a) The head assembly consists of the..., the head assembly shall meet performance requirements specified in paragraph (c) of this section. (b...

  11. Integrating Test-Form Formatting into Automated Test Assembly

    ERIC Educational Resources Information Center

    Diao, Qi; van der Linden, Wim J.

    2013-01-01

    Automated test assembly uses the methodology of mixed integer programming to select an optimal set of items from an item bank. Automated test-form generation uses the same methodology to optimally order the items and format the test form. From an optimization point of view, production of fully formatted test forms directly from the item pool using…

  12. 49 CFR 572.166 - Knees and knee impact test procedure.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Knees and knee impact test procedure. 572.166... Hybrid III Six-Year-Old Weighted Child Test Dummy § 572.166 Knees and knee impact test procedure. The knee assembly is assembled and tested as specified in 49 CFR 572.126 (Subpart N). ...

  13. Evaluating Statistical Targets for Assembling Parallel Mixed-Format Test Forms

    ERIC Educational Resources Information Center

    Debeer, Dries; Ali, Usama S.; van Rijn, Peter W.

    2017-01-01

    Test assembly is the process of selecting items from an item pool to form one or more new test forms. Often new test forms are constructed to be parallel with an existing (or an ideal) test. Within the context of item response theory, the test information function (TIF) or the test characteristic curve (TCC) are commonly used as statistical…

  14. 7. PHOTOCOPY, PLANS, ELEVATIONS, AND SECTION DRAWING FOR MISSILE TEST ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. PHOTOCOPY, PLANS, ELEVATIONS, AND SECTION DRAWING FOR MISSILE TEST AND ASSEMBLY BUILDING. - NIKE Missile Base SL-40, Missile Test & Assembly Building, South end of launch area, northeast of Generator Building No. 3, Hecker, Monroe County, IL

  15. International Space Station Carbon Dioxide Removal Assembly Testing

    NASA Technical Reports Server (NTRS)

    Knox, James C.

    2000-01-01

    Performance testing of the International Space Station Carbon Dioxide Removal Assembly flight hardware in the United States Laboratory during 1999 is described. The CDRA exceeded carbon dioxide performance specifications and operated flawlessly. Data from this test is presented.

  16. 49 CFR 572.175 - Upper and lower torso assemblies and torso flexion test procedure.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    .../lower torso assembly is as follows: (1) Torque the lumbar cable (drawing 420-4130) (incorporated by... threaded attachment holes. Tighten the mountings so that the test material is rigidly affixed to the test...

  17. 49 CFR 572.175 - Upper and lower torso assemblies and torso flexion test procedure.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    .../lower torso assembly is as follows: (1) Torque the lumbar cable (drawing 420-4130) (incorporated by... threaded attachment holes. Tighten the mountings so that the test material is rigidly affixed to the test...

  18. 49 CFR 572.175 - Upper and lower torso assemblies and torso flexion test procedure.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    .../lower torso assembly is as follows: (1) Torque the lumbar cable (drawing 420-4130) (incorporated by... threaded attachment holes. Tighten the mountings so that the test material is rigidly affixed to the test...

  19. Development of assembly techniques for fire resistant aircraft interior panels

    NASA Technical Reports Server (NTRS)

    Lee, S. C. S.

    1978-01-01

    Ten NASA Type A fire resistant aircraft interior panels were fabricated and tested to develop assembly techniques. These techiques were used in the construction of a full scale lavatory test structure for flame propagation testing. The Type A panel is of sandwich construction consisting of Nomex honeycomb filled with quinone dioxime foam, and bismaleimide/glass face sheets bonded to the core with polyimide film adhesive. The materials selected and the assembly techniques developed for the lavatory test structure were designed for obtaining maximum fire containment with minimum smoke and toxic emission.

  20. Internally damped, self-arresting vertical drop-weight apparatus

    NASA Technical Reports Server (NTRS)

    Ambur, Damodar R. (Inventor); Prasad, Chunchu B. (Inventor); Waters, William A. (Inventor); Stockum, Robert W. (Inventor); Walter, Manfred A. (Inventor)

    1994-01-01

    A vertical dropped-weight impact test machine has a dropped-weight barrel vertically supported on upper and lower support brackets. The dropped-weight barrel is chambered to receive a dropped-weight assembly having a latch pin at its upper end, a damping unit in the middle, and a tup at its lower end. The tup is adapted for gathering data during impact testing. The latch pin releasably engages a latch pin coupling assembly. The latch pin coupling assembly is attached to a winch via a halyard for raising and lowering the dropped-weight assembly. The lower end of the dropped-weight barrel is provided with a bounce-back arresting mechanism which is activated by the descending passage of the dropped-weight assembly. After striking the specimen, the dropped-weight assembly rebounds vertically and is caught by the bounce-back arresting mechanism. The damping unit of the dropped-weight assembly serves to dissipate energy from the rebounding dropped-weight assembly and prevents the dropped-weight assembly from rebounding from the self-arresting mechanism.

  1. Fabrication of fuel pin assemblies, phase 3

    NASA Technical Reports Server (NTRS)

    Keeton, A. R.; Stemann, L. G.

    1972-01-01

    Five full size and eight reduced length fuel pins were fabricated for irradiation testing to evaluate design concepts for a fast spectrum lithium cooled compact space power reactor. These assemblies consisted of uranium mononitride fuel pellets encased in a T-111 (Ta-8W-2Hf) clad with a tungsten barrier separating fuel and clad. Fabrication procedures were fully qualified by process development and assembly qualification tests. Detailed specifications and procedures were written for the fabrication and assembly of prototype fuel pins.

  2. James Webb Space Telescope: Frequently Asked Questions for Scientists and Engineers

    NASA Technical Reports Server (NTRS)

    Gardner, Jonathan P.

    2008-01-01

    JWST will be tested incrementally during its construction, starting with individual mirrors and instruments (including cameras and spectrometers) and building up to the full observatory. JWST's mirrors and the telescope structure are first each tested individually, including optical testing of the mirrors and alignment testing of the structure inside a cold thermal-vacuum chamber. The mirrors are then installed on the telescope structure in a clean room at Goddard Space Flight Center (GSFC). In parallel to the telescope assembly and alignment, the instruments are being built and tested, again first individually, and then as part of an integrated instrument assembly. The integrated instrument assembly will be tested in a thermal-vacuum chamber at GSFC using an optical simulator of the telescope. This testing makes sure the instruments are properly aligned relative to each other and also provides an independent check of the individual tests. After both the telescope and the integrated instrument module are successfully assembled, the integrated instrument module will be installed onto the telescope, and the combined system will be sent to Johnson Space Flight Center (JSC) where it will be optically tested in one of the JSC chambers. The process includes testing the 18 primary mirror segments acting as a single primary mirror, and testing the end-to-end system. The final system test will assure that the combined telescope and instruments are focused and aligned properly, and that the alignment, once in space, will be within the range of the actively controlled optics. In general, the individual optical tests of instruments and mirrors are the most accurate. The final system tests provide a cost-effective check that no major problem has occurred during assembly. In addition, independent optical checks of earlier tests will be made as the full system is assembled, providing confidence that there are no major problems.

  3. A simulation facility for testing Space Station assembly procedures

    NASA Technical Reports Server (NTRS)

    Hajare, Ankur R.; Wick, Daniel T.; Shehad, Nagy M.

    1994-01-01

    NASA plans to construct the Space Station Freedom (SSF) in one of the most hazardous environments known to mankind - space. It is of the utmost importance that the procedures to assemble and operate the SSF in orbit are both safe and effective. This paper describes a facility designed to test the integration of the telerobotic systems and to test assembly procedures using a real-world robotic arm grappling space hardware in a simulated microgravity environment.

  4. Development of environmentally conscious cleaning process for leadless chip carrier assemblies. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Adams, B.E.

    1995-04-01

    A cross-functional team of process, product, quality, material, and design lab engineers was assembled to develop an environmentally friendly cleaning process for leadless chip carrier assemblies (LCCAs). Using flush and filter testing, Auger surface analysis, GC-Mass spectrophotometry, production yield results, and electrical testing results over an extended testing period, the team developed an aqueous cleaning process for LCCAs. The aqueous process replaced the Freon vapor degreasing/ultrasonic rinse process.

  5. Introduction and Validation of Chromium-Free Consumables for Welding Stainless Steels. Version 2

    DTIC Science & Technology

    2015-04-14

    12 4.3 Site-related Permits and Regulations .......................................................................... 13 TEST DESIGN ...109 Appendix K: X-ray Report on ENiCuRu Weld Test Assembly...60 Table 6.24 Radiographic Test Report on Baseline E308L-16 and Test ENiCuRu Weld Assemblies

  6. Evaluation of Hardware and Procedures for Astronaut Assembly and Repair of Large Precision Reflectors

    NASA Technical Reports Server (NTRS)

    Lake, Mark S.; Heard, Walter L., Jr.; Watson, Judith J.; Collins, Timothy J.

    2000-01-01

    A detailed procedure is presented that enables astronauts in extravehicular activity (EVA) to efficiently assemble and repair large (i.e., greater than 10m-diameter) segmented reflectors, supported by a truss, for space-based optical or radio-frequency science instruments. The procedure, estimated timelines, and reflector hardware performance are verified in simulated 0-g (neutral buoyancy) assembly tests of a 14m-diameter, offset-focus, reflector test article. The test article includes a near-flight-quality, 315-member, doubly curved support truss and 7 mockup reflector panels (roughly 2m in diameter) representing a portion of the 37 total panels needed to fully populate the reflector. Data from the tests indicate that a flight version of the design (including all reflector panels) could be assembled in less than 5 hours - less than the 6 hours normally permitted for a single EVA. This assembly rate essentially matches pre-test predictions that were based on a vast amount of historical data on EVA assembly of structures produced by NASA Langley Research Center. Furthermore, procedures and a tool for the removal and replacement of a damaged reflector panel were evaluated, and it was shown that EVA repair of this type of reflector is feasible with the use of appropriate EVA crew aids.

  7. Safety Evaluation of Self-assembling Peptide Gel after Intracranial Administration to Rats Using the Open Field Test.

    PubMed

    Tsunoda, Masashi; Sugaya, Chiemi; Sugiura, Yumiko; Nagai, Yusuke; Sakanishi, Kotaro

    2016-01-01

    Self-assembling peptides have been developed as clinical materials, which could scaffold to regenerate nerve cells and hemostatic materials in vivo. However, there has not been enough information for their in vivo application. The safety of self-assembling peptides for the application on the brain was examined using behavioral tests for each rat in this study. Self-assembling peptide gel was administered to the surface of the brain at a volume of 20 µL at 1.5%. After 2 months, the open field test and the prepulse inhibition (PPI) test were performed. There were no significant differences between the peptide gel and the control groups in locomotor distances and in %PPIs in the PPI test. The mean values of the percentage of time the rats stayed in the central area of the open field during the first 5 min and instances of center rearing or face washing in the peptide gel group were significantly higher than those in the control. There were amorphous substance in the subarachnoid region, and infiltrations of mononuclear cells were also observed in the self-assembling peptide gel group. Although the meaning of the effects observed in this study was not fully elucidated, the self-assembling gel produced marginal but significant behavioral and histological effects.

  8. 49 CFR 572.186 - Abdomen assembly.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Abdomen assembly. 572.186 Section 572.186... Test Dummy, 50th Percentile Adult Male § 572.186 Abdomen assembly. (a) The abdomen assembly (175-5000) is part of the dummy assembly shown in drawing 175-0000 including load sensors specified in § 572.189...

  9. 49 CFR 572.112 - Head assembly.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Head assembly. 572.112 Section 572.112... 50th Percentile Male § 572.112 Head assembly. The head assembly consists of the head (drawing 78051-61X...) accelerometers that are mounted in conformance to § 572.36 (c). (a) Test procedure. (1) Soak the head assembly in...

  10. 49 CFR 572.112 - Head assembly.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 7 2011-10-01 2011-10-01 false Head assembly. 572.112 Section 572.112... 50th Percentile Male § 572.112 Head assembly. The head assembly consists of the head (drawing 78051-61X...) accelerometers that are mounted in conformance to § 572.36 (c). (a) Test procedure. (1) Soak the head assembly in...

  11. 49 CFR 572.112 - Head assembly.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Head assembly. 572.112 Section 572.112... 50th Percentile Male § 572.112 Head assembly. The head assembly consists of the head (drawing 78051-61X...) accelerometers that are mounted in conformance to § 572.36 (c). (a) Test procedure. (1) Soak the head assembly in...

  12. 49 CFR 572.112 - Head assembly.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Head assembly. 572.112 Section 572.112... 50th Percentile Male § 572.112 Head assembly. The head assembly consists of the head (drawing 78051-61X...) accelerometers that are mounted in conformance to § 572.36 (c). (a) Test procedure. (1) Soak the head assembly in...

  13. 49 CFR 572.112 - Head assembly.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Head assembly. 572.112 Section 572.112... 50th Percentile Male § 572.112 Head assembly. The head assembly consists of the head (drawing 78051-61X...) accelerometers that are mounted in conformance to § 572.36 (c). (a) Test procedure. (1) Soak the head assembly in...

  14. Detail design of the surface tension propellant management device for the Intelsat VII communication satellite

    NASA Astrophysics Data System (ADS)

    Giacalone, Philip L.

    1993-06-01

    The design of the Intelsat VII surface tension propellant management device (PMD) (an all-welded assembly consisting of about 100 individual components) was developed using a modular design approach that allowed the complex PMD assembly to be divided into smaller modules. The modular approach reduces manufacturing-related technical and schedule risks and allows many components and assemblies to be processed in parallel, while also facilitating the incorporation of quality assurance tests at all critical PMD subassembly levels. The baseline PMD assembly is made from titanium and stainless steel materials. In order to obtain a 100 percent titanium PMD, a new, state-of-the-art fine mesh titanium screen material was developed, tested, and qualified for use as an alternaltive to the stainless steel screen material. The Ti based screen material demonstrated a high level of bubble point performance. It was integrated into a PMD assembly and was successfully qualification tested at the tank assembly level.

  15. Baseline tests of an autonomous telerobotic system for assembly of space truss structures

    NASA Technical Reports Server (NTRS)

    Rhodes, Marvin D.; Will, Ralph W.; Quach, Coung

    1994-01-01

    Several proposed space missions include precision reflectors that are larger in diameter than any current or proposed launch vehicle. Most of these reflectors will require a truss structure to accurately position the reflector panels and these reflectors will likely require assembly in orbit. A research program has been conducted at the NASA Langley Research Center to develop the technology required for the robotic assembly of truss structures. The focus of this research has been on hardware concepts, computer software control systems, and operator interfaces necessary to perform supervised autonomous assembly. A special facility was developed and four assembly and disassembly tests of a 102-strut tetrahedral truss have been conducted. The test procedures were developed around traditional 'pick-and-place' robotic techniques that rely on positioning repeatability for successful operation. The data from two of the four tests were evaluated and are presented in this report. All operations in the tests were controlled by predefined sequences stored in a command file, and the operator intervened only when the system paused because of the failure of an actuator command. The tests were successful in identifying potential pitfalls in a telerobotic system, many of which would not have been readily anticipated or incurred through simulation studies. Addressing the total integrated task, instead of bench testing the component parts, forced all aspects of the task to be evaluated. Although the test results indicate that additional developments should be pursued, no problems were encountered that would preclude automated assembly in space as a viable construction method.

  16. Uniform Test Assembly

    ERIC Educational Resources Information Center

    Belov, Dmitry I.

    2008-01-01

    In educational practice, a test assembly problem is formulated as a system of inequalities induced by test specifications. Each solution to the system is a test, represented by a 0-1 vector, where each element corresponds to an item included (1) or not included (0) into the test. Therefore, the size of a 0-1 vector equals the number of items "n"…

  17. LPT. Shield test facility assembly and test building (TAN646), south ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    LPT. Shield test facility assembly and test building (TAN-646), south facade. Camera facing north. High-bay section is pool room. Single-story section at right is control building (TAN-645). Small metal building is post-1970 addition. INEEL negative no. HD-40-7-3 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID

  18. The SLS Stages Intertank Structural Test Assembly (STA) arrives at MSFC

    NASA Image and Video Library

    2018-03-06

    The SLS Stages Intertank Structural Test Assembly (STA) is rolling off the NASA Pegasus Barge at the MSFC Dock enroute to the MSFC 4619 Load Test Annex test facility for qualification testing. Members of MSFC Logistics Office and Move Team members gather for last minute instructions and safety briefing before off-loading STA hardware.

  19. A Multiple Objective Test Assembly Approach for Exposure Control Problems in Computerized Adaptive Testing

    ERIC Educational Resources Information Center

    Veldkamp, Bernard P.; Verschoor, Angela J.; Eggen, Theo J. H. M.

    2010-01-01

    Overexposure and underexposure of items in the bank are serious problems in operational computerized adaptive testing (CAT) systems. These exposure problems might result in item compromise, or point at a waste of investments. The exposure control problem can be viewed as a test assembly problem with multiple objectives. Information in the test has…

  20. 30 CFR 7.45 - Critical characteristics

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... APPROVAL OF MINING PRODUCTS TESTING BY APPLICANT OR THIRD PARTY Battery Assemblies § 7.45 Critical characteristics The following critical characteristics shall be inspected or tested on each battery assembly to...

  1. 30 CFR 7.45 - Critical characteristics

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... APPROVAL OF MINING PRODUCTS TESTING BY APPLICANT OR THIRD PARTY Battery Assemblies § 7.45 Critical characteristics The following critical characteristics shall be inspected or tested on each battery assembly to...

  2. PBF Reactor Building (PER620). PBF crane holds fuel test assembly ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PBF Reactor Building (PER-620). PBF crane holds fuel test assembly aloft prior to lowering into reactor for test. Date: 1982. INEEL negative no. 82-4909 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  3. Hybrid Wing Body Multi-Bay Test Article Analysis and Assembly Final Report

    NASA Technical Reports Server (NTRS)

    Velicki, Alexander; Hoffman, Krishna; Linton, Kim A.; Baraja, Jaime; Wu, Hsi-Yung T.; Thrash, Patrick

    2017-01-01

    This report summarizes work performed by The Boeing Company, through its Boeing Research & Technology organization located in Huntington Beach, California, under the Environmentally Responsible Aviation (ERA) project. The report documents work performed to structurally analyze and assemble a large-scale Multi-bay Box (MBB) Test Article capable of withstanding bending and internal pressure loadings representative of a Hybrid Wing Body (HWB) aircraft. The work included fabrication of tooling elements for use in the fabrication and assembly of the test article.

  4. DOE Office of Scientific and Technical Information (OSTI.GOV)

    West, W.S.

    Progress during the period includes completion of the SNAP 7C system tests, completion of safety analysis for the SNAP 7A and C systems, assembly and initial testing of SNAP 7A, assembly of a modified reliability model, and assembly of a 10-W generator. Other activities include completion of thermal and safety analyses for SNAP 7B and D generators and fuel processing for these generators. (J.R.D.)

  5. Design and Fabrication of Cryostat Interface and Electronics for High Performance Antimatter Trap (HI-PAT)

    NASA Technical Reports Server (NTRS)

    Smith, Gerald A.

    1999-01-01

    Included in Appendix I to this report is a complete set of design and assembly schematics for the high vacuum inner trap assembly, cryostat interfaces and electronic components for the MSFC HI-PAT. Also included in the final report are summaries of vacuum tests, and electronic tests performed upon completion of the assembly.

  6. 40 CFR 1054.305 - How must I prepare and test my production-line engines?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... way that represents the assembly procedures for other engines in the engine family. You must ask us to approve any deviations from your normal assembly procedures for other production engines in the engine family. (a) Test procedures. Test your production-line engines using the applicable testing procedures in...

  7. 40 CFR 1054.305 - How must I prepare and test my production-line engines?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... way that represents the assembly procedures for other engines in the engine family. You must ask us to approve any deviations from your normal assembly procedures for other production engines in the engine family. (a) Test procedures. Test your production-line engines using the applicable testing procedures in...

  8. 40 CFR 1054.305 - How must I prepare and test my production-line engines?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... way that represents the assembly procedures for other engines in the engine family. You must ask us to approve any deviations from your normal assembly procedures for other production engines in the engine family. (a) Test procedures. Test your production-line engines using the applicable testing procedures in...

  9. 40 CFR 1054.305 - How must I prepare and test my production-line engines?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... way that represents the assembly procedures for other engines in the engine family. You must ask us to approve any deviations from your normal assembly procedures for other production engines in the engine family. (a) Test procedures. Test your production-line engines using the applicable testing procedures in...

  10. 40 CFR 1054.305 - How must I prepare and test my production-line engines?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... way that represents the assembly procedures for other engines in the engine family. You must ask us to approve any deviations from your normal assembly procedures for other production engines in the engine family. (a) Test procedures. Test your production-line engines using the applicable testing procedures in...

  11. Observed-Score Equating as a Test Assembly Problem.

    ERIC Educational Resources Information Center

    van der Linden, Wim J.; Luecht, Richard M.

    1998-01-01

    Derives a set of linear conditions of item-response functions that guarantees identical observed-score distributions on two test forms. The conditions can be added as constraints to a linear programming model for test assembly. An example illustrates the use of the model for an item pool from the Law School Admissions Test (LSAT). (SLD)

  12. Computer Assisted Assembly of Tests at Educational Testing Service.

    ERIC Educational Resources Information Center

    Educational Testing Service, Princeton, NJ.

    Two basic requirements for the successful initiation of a program for test assembly are the development of detailed item content classification systems and the delineation of the professional judgements made in building a test from a pool of items to detailed content, ability, and statistical specifications in terms precise enough to be translated…

  13. Integrated Advanced Microwave Sounding Unit-A (AMSU-A). Performance Verification Report: METSAT Phase Locked Oscillator Assembly, P/N 1334360-1, S/N's F03 and F04

    NASA Technical Reports Server (NTRS)

    Pines, D.

    1998-01-01

    Two Flight Model AMSU-A Phase Locked Oscillators (P/N 1348360-1, S/Ns F03 and F04) have been tested per AES Test Procedure AE-26758. The tests included vibration testing, thermal cycle testing, AM/FM Noise testing, and full functional testing. EMI/REO 2 Testing was not performed. (See test data for S/N F01). Both AMSU-A Phase Locked Oscillators satisfactorily passed all performance requirements of the AE-26633 Product specification. During thermal cycling of PLO serial number F03, the oven and data logger momentarily lost power, including a loss of data. The unit did not experience any thermal stress. TAR 003134 describes the corrective action. Prior to testing PLO serial number FO4, power was applied to the unit. (+15v,-15v) the unit did not display the proper phase lock. Upon test equipment check out a connector was found to be defective. TAR 003133 describes the corrective action. After completion of testing of PLO serial number F04 was installed into Receiver Assembly F02. Upon testing F02 Receiver Assembly the unit was found not to phase lock at ambient temperature. Removal of PLO Assembly F04 was required. R2 was the real issue. Solithane was secondary. Troubleshooting revealed excessive solithane on inner PLL Assembly cover inhibiting optimum grounding. Also, R2 was reselected which increased the lock range from -30 C to +60 C. TAR 002737 describes the corrective action.

  14. 49 CFR 572.5 - General description.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... M080—Right leg assembly SA 150 M081—Left leg assembly SA 150 M010—Head assembly SA 150 M020—Neck... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) ANTHROPOMORPHIC TEST DEVICES 50th Percentile Male § 572... grouped by component assemblies under the following nine headings: SA 150 M070—Right arm assembly SA 150...

  15. Cryogenic Fiber Optic Assemblies for Spaceflight Environments: Design, Manufacturing, Testing, and Integration

    NASA Technical Reports Server (NTRS)

    Thomes, W. Joe; Ott, Melanie N.; Chuska, Richard; Switzer, Robert; Onuma, Eleanya; Blair, Diana; Frese, Erich; Matyseck, Marc

    2016-01-01

    Fiber optic assemblies have been used on spaceflight missions for many years as an enabling technology for routing, transmitting, and detecting optical signals. Due to the overwhelming success of NASA in implementing fiber optic assemblies on spaceflight science-based instruments, system scientists increasingly request fibers that perform in extreme environments while still maintaining very high optical transmission, stability, and reliability. Many new applications require fiber optic assemblies that will operate down to cryogenic temperatures as low as 20 Kelvin. In order for the fiber assemblies to operate with little loss in optical throughput at these extreme temperatures requires a system level approach all the way from how the fiber assembly is manufactured to how it is held, routed, and integrated. The NASA Goddard Code 562 Photonics Group has been designing, manufacturing, testing, and integrating fiber optics for spaceflight and other high reliability applications for nearly 20 years. Design techniques and lessons learned over the years are consistently applied to developing new fiber optic assemblies that meet these demanding environments. System level trades, fiber assembly design methods, manufacturing, testing, and integration will be discussed. Specific recent examples of ground support equipment for the James Webb Space Telescope (JWST); the Ice, Cloud and Land Elevation Satellite-2 (ICESat-2); and others will be included.

  16. Cryogenic fiber optic assemblies for spaceflight environments: design, manufacturing, testing, and integration

    NASA Astrophysics Data System (ADS)

    Thomes, W. Joe; Ott, Melanie N.; Chuska, Richard; Switzer, Robert; Onuma, Eleanya; Blair, Diana; Frese, Erich; Matyseck, Marc

    2016-09-01

    Fiber optic assemblies have been used on spaceflight missions for many years as an enabling technology for routing, transmitting, and detecting optical signals. Due to the overwhelming success of NASA in implementing fiber optic assemblies on spaceflight science-based instruments, system scientists increasingly request fibers that perform in extreme environments while still maintaining very high optical transmission, stability, and reliability. Many new applications require fiber optic assemblies that will operate down to cryogenic temperatures as low as 20 Kelvin. In order for the fiber assemblies to operate with little loss in optical throughput at these extreme temperatures requires a system level approach all the way from how the fiber assembly is manufactured to how it is held, routed, and integrated. The NASA Goddard Code 562 Photonics Group has been designing, manufacturing, testing, and integrating fiber optics for spaceflight and other high reliability applications for nearly 20 years. Design techniques and lessons learned over the years are consistently applied to developing new fiber optic assemblies that meet these demanding environments. System level trades, fiber assembly design methods, manufacturing, testing, and integration will be discussed. Specific recent examples of ground support equipment for the James Webb Space Telescope (JWST); the Ice, Cloud and Land Elevation Satellite-2 (ICESat- 2); and others will be included.

  17. 14 CFR 33.88 - Engine overtemperature test.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AIRWORTHINESS STANDARDS: AIRCRAFT ENGINES Block Tests; Turbine Aircraft Engines § 33.88 Engine overtemperature... this run, the turbine assembly must be within serviceable limits. (b) In addition to the test... this run, the turbine assembly may exhibit distress beyond the limits for an overtemperature condition...

  18. 14 CFR 33.88 - Engine overtemperature test.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... AIRWORTHINESS STANDARDS: AIRCRAFT ENGINES Block Tests; Turbine Aircraft Engines § 33.88 Engine overtemperature... this run, the turbine assembly must be within serviceable limits. (b) In addition to the test... this run, the turbine assembly may exhibit distress beyond the limits for an overtemperature condition...

  19. 14 CFR 33.88 - Engine overtemperature test.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... AIRWORTHINESS STANDARDS: AIRCRAFT ENGINES Block Tests; Turbine Aircraft Engines § 33.88 Engine overtemperature... this run, the turbine assembly must be within serviceable limits. (b) In addition to the test... this run, the turbine assembly may exhibit distress beyond the limits for an overtemperature condition...

  20. Fabrication Control Plan for ORNL RH-LOCA ATF Test Specimens to be Irradiated in the ATR

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Field, Kevin G.; Howard, Richard; Teague, Michael

    2014-06-01

    The purpose of this fabrication plan is (1) to summarize the design of a set of rodlets that will be fabricated and then irradiated in the Advanced Test Reactor (ATR) and (2) provide requirements for fabrication and acceptance criteria for inspections of the Light Water Reactor (LWR) – Accident Tolerant Fuels (ATF) rodlet components. The functional and operational (F&OR) requirements for the ATF program are identified in the ATF Test Plan. The scope of this document only covers fabrication and inspections of rodlet components detailed in drawings 604496 and 604497. It does not cover the assembly of these items tomore » form a completed test irradiation assembly or the inspection of the final assembly, which will be included in a separate INL final test assembly specification/inspection document. The controls support the requirements that the test irradiations must be performed safely and that subsequent examinations must provide valid results.« less

  1. SP-100 GES/NAT radiation shielding systems design and development testing

    NASA Astrophysics Data System (ADS)

    Disney, Richard K.; Kulikowski, Henry D.; McGinnis, Cynthia A.; Reese, James C.; Thomas, Kevin; Wiltshire, Frank

    1991-01-01

    Advanced Energy Systems (AES) of Westinghouse Electric Corporation is under subcontract to the General Electric Company to supply nuclear radiation shielding components for the SP-100 Ground Engineering System (GES) Nuclear Assembly Test to be conducted at Westinghouse Hanford Company at Richland, Washington. The radiation shielding components are integral to the Nuclear Assembly Test (NAT) assembly and include prototypic and non-prototypic radiation shielding components which provide prototypic test conditions for the SP-100 reactor subsystem and reactor control subsystem components during the GES/NAT operations. W-AES is designing three radiation shield components for the NAT assembly; a prototypic Generic Flight System (GFS) shield, the Lower Internal Facility Shield (LIFS), and the Upper Internal Facility Shield (UIFS). This paper describes the design approach and development testing to support the design, fabrication, and assembly of these three shield components for use within the vacuum vessel of the GES/NAT. The GES/NAT shields must be designed to operate in a high vacuum which simulates space operations. The GFS shield and LIFS must provide prototypic radiation/thermal environments and mechanical interfaces for reactor system components. The NAT shields, in combination with the test facility shielding, must provide adequate radiation attenuation for overall test operations. Special design considerations account for the ground test facility effects on the prototypic GFS shield. Validation of the GFS shield design and performance will be based on detailed Monte Carlo analyses and developmental testing of design features. Full scale prototype testing of the shield subsystems is not planned.

  2. Solving Infeasibility Problems in Computerized Test Assembly.

    ERIC Educational Resources Information Center

    Timminga, Ellen

    1998-01-01

    Discusses problems of diagnosing and repairing infeasible linear-programming models in computerized test assembly. Demonstrates that it is possible to localize the causes of infeasibility, although this is not always easy. (SLD)

  3. The MARVEL assembly for neutron multiplication.

    PubMed

    Chichester, David L; Kinlaw, Mathew T

    2013-10-01

    A new multiplying test assembly is under development at Idaho National Laboratory to support research, validation, evaluation, and learning. The item is comprised of three stacked, highly-enriched uranium (HEU) cylinders, each 11.4 cm in diameter and having a combined height of up to 11.7 cm. The combined mass of all three cylinders is 20.3 kg of HEU. Calculations for the bare configuration of the assembly indicate a multiplication level of >3.5 (k(eff)=0.72). Reflected configurations of the assembly, using either polyethylene or tungsten, are possible and have the capability of raising the assembly's multiplication level to greater than 10. This paper describes simulations performed to assess the assembly's multiplication level under different conditions and describes the resources available at INL to support the use of these materials. We also describe some preliminary calculations and test activities using the assembly to study neutron multiplication. Copyright © 2013 Elsevier Ltd. All rights reserved.

  4. Payload spin assembly for the commercial Titan launch vehicle

    NASA Technical Reports Server (NTRS)

    Robinson, Wilf; Pech, Greg

    1991-01-01

    A contract was completed to design, build, and test a Payload Spin Assembly (PSA) for installation onto the Martin Marietta Titan 3 Commercial launch vehicle. This assembly provides launch support for satellite payloads up to 5783 kilograms (6.37 tons) and controls release, spin-up, and final separation of the satellite from the second stage. Once separated, the satellite's Perigee Kick Motor (PKM) boosts the satellite into its transfer orbit. The first successful flight occurred December 31, 1989. Requirements, design, test, and problems associated with this mechanical assembly are discussed.

  5. LPT. Shield test facility assembly and test building (TAN646), south ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    LPT. Shield test facility assembly and test building (TAN-646), south end of EBOR helium wing. Camera facing north. Monorail protrudes from upper-level door. Rust marks on concrete wall are from stack. Metal shed is post-1970 addition. INEEL negative no. HD-40-8-1 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID

  6. Analysis of space environment damage to solar cell assemblies from LDEF experiment A0171-GSFC test plate

    NASA Technical Reports Server (NTRS)

    Hill, David C.; Rose, M. Frank

    1994-01-01

    The results of the postflight analysis of the solar cell assemblies from the LDEF (Long Duration Exposure facility) experiment A0171 is provided in this NASA sponsored research project. The following data on this research are provided as follows: (1) solar cell description, including, substrate composition and thickness, crystal orientation, anti-reflective coating composition and thickness; (2) preflight characteristics of the solar cell assemblies with respect to current and voltage; and (3) post-flight characteristics of the solar cell assemblies with respect to voltage and current. These solar cell assemblies are part of the Goddard Space Flight Center test plate which was designed to test the space environment effects (radiation, atomic oxygen, thermal cycling, meteoroid and debris) on conductively coated solar cell coversheets, various electrical bond materials, solar cell performance, and other material properties where feasible.

  7. An expert system executive for automated assembly of large space truss structures

    NASA Technical Reports Server (NTRS)

    Allen, Cheryl L.

    1993-01-01

    Langley Research Center developed a unique test bed for investigating the practical problems associated with the assembly of large space truss structures using robotic manipulators. The test bed is the result of an interdisciplinary effort that encompasses the full spectrum of assembly problems - from the design of mechanisms to the development of software. The automated structures assembly test bed and its operation are described, the expert system executive and its development are detailed, and the planned system evolution is discussed. Emphasis is on the expert system implementation of the program executive. The executive program must direct and reliably perform complex assembly tasks with the flexibility to recover from realistic system errors. The employment of an expert system permits information that pertains to the operation of the system to be encapsulated concisely within a knowledge base. This consolidation substantially reduced code, increased flexibility, eased software upgrades, and realized a savings in software maintenance costs.

  8. 78 FR 45104 - Model Manufactured Home Installation Standards: Ground Anchor Installations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-26

    ... test methods for establishing working load design values of ground anchor assemblies used for new... anchor installations and establish standardized test methods to determine ground anchor performance and... currently no national test method for rating and certifying ground anchor assemblies in different soil...

  9. LPT. Low power assembly and test building (TAN640). Camera facing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    LPT. Low power assembly and test building (TAN-640). Camera facing west. Rollup doors to each test cell face east. Concrete walls poured in place. Apparatus at right of view was part of a post-ANP program. INEEL negative no. HD-40-1-1 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID

  10. Status of the eROSITA Telescope testing and calibrating the x-ray mirror assemblies

    NASA Astrophysics Data System (ADS)

    Burwitz, Vadim; Predehl, Peter; Bräuninger, Heinrich; Burkert, Wolfgang; Dennerl, Konrad; Eder, Josef; Friedrich, Peter; Fürmetz, Maria; Grisoni, Gabriele; Hartner, Gisela; Marioni, Fabio; Menz, Benedikt; Pfeffermann, Elmar; Valsecchi, Giuseppe

    2013-09-01

    The eROSITA X-ray observatory that will be launched on board the Russian Spectrum-RG mission comprises seven X-ray telescopes, each with its own mirror assembly (mirror module + X-ray baffle), electron deflector, filter wheel, and CCD camera with its control electronics. The completed flight mirror modules are undergoing many thorough X-ray tests at the PANTHER X-ray test facility after delivery, after being mated with the X-ray baffle, and again after both the vibration and thermal-vacuum tests. A description of the work done with mirror modules/assemblies and the test results obtained will be reported here. We report also on the environmental tests that have been performed on the eROSITA telescope qualification model.

  11. Development Status of the Fission Power System Technology Demonstration Unit

    NASA Technical Reports Server (NTRS)

    Briggs, Maxwell H.; Gibson, Marc A.; Geng, Steven M.; Pearson, Jon Boise; Godfoy, Thomas

    2012-01-01

    This paper summarizes the progress that has been made in the development of the Fission Power System Technology Demonstration Unit (TDU). The reactor simulator core and Annular Linear Induction Pump have been fabricated and assembled into a test loop at the NASA Marshall Space Flight Center. A 12 kWe Power Conversion Unit (PCU) is being developed consisting of two 6 kWe free-piston Stirling engines. The two 6 kWe engines have been fabricated by Sunpower Inc. and are currently being tested separately prior to integration into the PCU. The Facility Cooling System (FCS) used to reject convertor waste heat has been assembled and tested at the NASA Glenn Research Center (GRC). The structural elements, including a Buildup Assembly Platform (BAP) and Upper Truss Structure (UTS) have been fabricated, and will be used to test cold-end components in thermal vacuum prior to TDU testing. Once all components have been fully tested at the subsystem level, they will be assembled into an end-to-end system and tested in thermal vacuum at GRC.

  12. Base excitation testing system using spring elements to pivotally mount wind turbine blades

    DOEpatents

    Cotrell, Jason; Hughes, Scott; Butterfield, Sandy; Lambert, Scott

    2013-12-10

    A system (1100) for fatigue testing wind turbine blades (1102) through forced or resonant excitation of the base (1104) of a blade (1102). The system (1100) includes a test stand (1112) and a restoring spring assembly (1120) mounted on the test stand (1112). The restoring spring assembly (1120) includes a primary spring element (1124) that extends outward from the test stand (1112) to a blade mounting plate (1130) configured to receive a base (1104) of blade (1102). During fatigue testing, a supported base (1104) of a blad (1102) may be pivotally mounted to the test stand (1112) via the restoring spring assembly (1120). The system (1100) may include an excitation input assembly (1140) that is interconnected with the blade mouting plate (1130) to selectively apply flapwise, edgewise, and/or pitch excitation forces. The restoring spring assemply (1120) may include at least one tuning spring member (1127) positioned adjacent to the primary spring element (1124) used to tune the spring constant or stiffness of the primary spring element (1124) in one of the excitation directions.

  13. Development Status of the Fission Power System Technology Demonstration Unit

    NASA Technical Reports Server (NTRS)

    Briggs, Maxwell H.; Gibson, Marc A.; Geng, Steven M; Pearson, Jon Boise; Godfroy, Thomas

    2012-01-01

    This paper summarizes the progress that has been made in the development of the Fission Power System Technology Demonstration Unit (TDU). The reactor simulator core and Annular Linear Induction Pump have been fabricated and assembled into a test loop at the NASA Marshall Space Flight Center. A 12 kWe Power Conversion Unit (PCU) is being developed consisting of two 6 kWe free-piston Stirling engines. The two 6 kWe engines have been fabricated by Sunpower Inc. and are currently being tested separately prior to integration into the PCU. The Facility Cooling System (FCS) used to reject convertor waste heat has been assembled and tested at the NASA Glenn Research Center (GRC). The structural elements, including a Buildup Assembly Platform (BAP) and Upper Truss Structure (UTS) have been fabricated, and will be used to test cold-end components in thermal vacuum prior to TDU testing. Once all components have been fully tested at the subsystem level, they will be assembled into an end-to-end system and tested in thermal vacuum at NASA GRC.

  14. Cryogenic Optical Performance of a Lightweighted Mirror Assembly for Future Space Astronomical Telescopes: Correlating Optical Test Results and Thermal Optical Model

    NASA Technical Reports Server (NTRS)

    Eng, Ron; Arnold, William R.; Baker, Marcus A.; Bevan, Ryan M.; Burdick, Gregory; Effinger, Michael R.; Gaddy, Darrell E.; Goode, Brian K.; Hanson, Craig; Hogue, William D.; hide

    2013-01-01

    A 43cm diameter stacked core mirror demonstrator was interferometrically tested at room temperature down to 250 degrees Kelvin for thermal deformation. The 2.5m radius of curvature spherical mirror assembly was constructed by low temperature fusing three abrasive waterjet core sections between two CNC pocket milled face sheets. The 93% lightweighted Corning ULE® mirror assembly represents the current state of the art for future UV, optical, near IR space telescopes. During the multiple thermal test cycles, test results of interferometric test, thermal IR images of the front face were recorded in order to validate thermal optical model.

  15. KSC-2009-3672

    NASA Image and Video Library

    2009-06-11

    CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, employees gather to watch the Ares I-X forward assembly (comprising the frustum, forward skirt extension and forward skirt) as it moves out of the Assembly and Refurbishment Facility. The assembly is being transferred to the Vehicle Assembly Building's High Bay 4 for processing and stacking to the upper stage. Ares I-X is the flight test for the Ares I which will provide NASA an early opportunity to test and prove hardware, facilities and ground operations associated with Ares I, which is part of the Constellation Program to return men to the moon and beyond. Launch of the Ares I-X flight test is targeted for August 2009. Photo credit: NASA/Jack Pfaller

  16. Assembly processes comparison for a miniaturized laser used for the Exomars European Space Agency mission

    NASA Astrophysics Data System (ADS)

    Ribes-Pleguezuelo, Pol; Inza, Andoni Moral; Basset, Marta Gilaberte; Rodríguez, Pablo; Rodríguez, Gemma; Laudisio, Marco; Galan, Miguel; Hornaff, Marcel; Beckert, Erik; Eberhardt, Ramona; Tünnermann, Andreas

    2016-11-01

    A miniaturized diode-pumped solid-state laser (DPSSL) designed as part of the Raman laser spectrometer (RLS) instrument for the European Space Agency (ESA) Exomars mission 2020 is assembled and tested for the mission purpose and requirements. Two different processes were tried for the laser assembling: one based on adhesives, following traditional laser manufacturing processes; another based on a low-stress and organic-free soldering technique called solderjet bumping technology. The manufactured devices were tested for the processes validation by passing mechanical, thermal cycles, radiation, and optical functional tests. The comparison analysis showed a device improvement in terms of reliability of the optical performances from the soldered to the assembled by adhesive-based means.

  17. 4. PROPOSED C1 ASSEMBLY AND TESTING FACILITIES FOR THE ORDINANCE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. PROPOSED C-1 ASSEMBLY AND TESTING FACILITIES FOR THE ORDINANCE GUIDED MISSILE CENTER AT REDSTONE ARSENAL, NEAR THE SOUTH END OF MADKIN MOUNTAIN. OCTOBER 1950, HANNES LUEHRSEN COLLECTION, MSFC MASTER PLANNING OFFICE. - Marshall Space Flight Center, East Test Area, Dodd Road, Huntsville, Madison County, AL

  18. Integrated Advanced Microwave Sounding Unit-A (AMSU-A): Engineering Test Report: METSAT A2 Signal Processor (P/N 1331120-2, S/N F03) S/N 107

    NASA Technical Reports Server (NTRS)

    1998-01-01

    This report presents a description of the tests performed, and the test data, for the A2 METSAT Signal Processor Assembly PN: 1331120-2, S/N F03. The assembly was tested in accordance with AE-26754, "METSAT Signal Processor Scan Drive Test and Integration Procedure."

  19. Integrated Advanced Microwave Sounding Unit-A (AMSU-A): Engineering Test Report, METSAT A2 Signal Processor (P/N 1331120-2, S/N F04) S/N 108

    NASA Technical Reports Server (NTRS)

    1998-01-01

    This report presents a description of the tests performed, and the test data, for the A2 METSAT Signal Processor Assembly PN: 1331120-2, S/N F04. The assembly was tested in accordance with AE-26754, "METSAT Signal Processor Scan Drive Test and Integration Procedure."

  20. A space crane concept for performing on-orbit assembly

    NASA Technical Reports Server (NTRS)

    Dorsey, John T.

    1992-01-01

    The topics are presented in viewgraph form and include: in-space assembly and construction enhances future mission planning flexibility; in-space assembly and construction facility concept; space crane concept with mobile base; fundamental characteristics; space crane research approach; spacecraft component positioning and assembly test-bed; and articulating joint testbed.

  1. 49 CFR 572.184 - Shoulder assembly.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Shoulder assembly. 572.184 Section 572.184... Test Dummy, 50th Percentile Adult Male § 572.184 Shoulder assembly. (a) The shoulder (175-3000) is part... (b) of this section, the shoulder assembly shall meet performance requirements of paragraph (c) of...

  2. 49 CFR 572.184 - Shoulder assembly.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Shoulder assembly. 572.184 Section 572.184... Test Dummy, 50th Percentile Adult Male § 572.184 Shoulder assembly. (a) The shoulder (175-3000) is part... (b) of this section, the shoulder assembly shall meet performance requirements of paragraph (c) of...

  3. Dual-axis resonance testing of wind turbine blades

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hughes, Scott; Musial, Walter; White, Darris

    An apparatus (100) for fatigue testing test articles (104) including wind turbine blades. The apparatus (100) includes a test stand (110) that rigidly supports an end (106) of the test article (104). An actuator assembly (120) is attached to the test article (104) and is adapted for substantially concurrently imparting first and second forcing functions in first and second directions on the test article (104), with the first and second directions being perpendicular to a longitudinal axis. A controller (130) transmits first and second sets of displacement signals (160, 164) to the actuator assembly (120) at two resonant frequencies ofmore » the test system (104). The displacement signals (160, 164) initiate the actuator assembly (120) to impart the forcing loads to concurrently oscillate the test article (104) in the first and second directions. With turbine blades, the blades (104) are resonant tested concurrently for fatigue in the flapwise and edgewise directions.« less

  4. Apparatus for testing high pressure injector elements

    NASA Technical Reports Server (NTRS)

    Myers, William Neill (Inventor); Scott, Ewell M. (Inventor); Forbes, John C. (Inventor); Shadoan, Michael D. (Inventor)

    1995-01-01

    An apparatus for testing and evaluating the spray pattern of high pressure fuel injector elements for use in supplying fuel to combustion engines is presented. Prior art fuel injector elements were normally tested by use of low pressure apparatuses which did not provide a purge to prevent mist from obscuring the injector element or to prevent frosting of the view windows; could utilize only one fluid during each test; and had their viewing ports positioned one hundred eighty (180 deg) apart, thus preventing optimum use of laser diagnostics. The high pressure fluid injector test apparatus includes an upper hub, an upper weldment or housing, a first clamp and stud/nut assembly for securing the upper hub to the upper weldment, a standoff assembly within the upper weldment, a pair of window housings having view glasses within the upper weldment, an injector block assembly and purge plate within the upper weldment for holding an injector element to be tested and evaluated, a lower weldment or housing, a second clamp and stud/nut assembly for securing the lower weldment to the upper hub, a third clamp and stud/nut assembly for securing the lower hub to the lower weldment, mechanisms for introducing fluid under high pressure for testing an injector element, and mechanisms for purging the apparatus to prevent frosting of view glasses within the window housings and to permit unobstructed viewing of the injector element.

  5. Apparatus for testing high pressure injector elements

    NASA Technical Reports Server (NTRS)

    Myers, William Neill (Inventor); Scott, Ewell M. (Inventor); Forbes, John C. (Inventor); Shadoan, Michael D. (Inventor)

    1993-01-01

    An apparatus for testing and evaluating the spray pattern of high pressure fuel injector elements for use in supplying fuel to combustion engines is presented. Prior art fuel injector elements were normally tested by use of low pressure apparatuses which did not provide a purge to prevent mist from obscuring the injector element or to prevent frosting of the view windows; could utilize only one fluid during each test; and had their viewing ports positioned one hundred eighty (180 deg) apart, thus preventing optimum use of laser diagnostics. The high pressure fluid injector test apparatus includes an upper hub, an upper weldment or housing, a first clamp and stud/nut assembly for securing the upper hub to the upper weldment, a standoff assembly within the upper weldment, a pair of window housings having view glasses within the upper weldment, an injector block assembly and purge plate within the upper weldment for holding an injector element to be tested and evaluated, a lower weldment or housing, a second clamp and stud/nut assembly for securing the lower weldment to the upper weldment, a lower hub, a third clamp and stud/nut assembly for securing the lower hub to the lower weldment, mechanisms for introducing fluid under high pressure for testing an injector element, and mechanisms for purging the apparatus to prevent frosting of view glasses within the window housings and to permit unobstructed viewing of the injector element.

  6. 2. MISSILE ASSEMBLY BUILDING, RIGHT SIDE, LOOKING NORTH. NIKE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. MISSILE ASSEMBLY BUILDING, RIGHT SIDE, LOOKING NORTH. - NIKE Missile Base C-84, Missile Test & Assembly Building, North of Launch Area Entrance Drive & east of Mess Hall, Barrington, Cook County, IL

  7. 77 FR 62260 - Niles America Wintech, Inc., Warehousing Division, a Valeo Company, Including On-Site Leased...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-12

    ..., Adecco Employment Services, Winchester, KY; Niles America Wintech, Inc., Assembly and Testing Division, a... former workers of Niles America Wintech, Inc., Warehousing Division and Assembly and Testing Division...

  8. Numerical simulation of Composition B high explosive charge desensitization in gap test assembly after loading by precursor wave

    NASA Astrophysics Data System (ADS)

    Balagansky, I. A.; Stepanov, A. A.

    2016-03-01

    Results of numerical research into the desensitization of high explosive charges in water gap test-based experimental assemblies are presented. The experimental data are discussed, and the analysis using ANSYS AUTODYN 14.5 is provided. The desensitization phenomenon is well reproduced in numerical simulation using the JWL EOS and the Lee-Tarver kinetic equation for modeling of the initiation of heterogeneous high explosives with as well as without shock front waves. The analysis of the wave processes occurring during the initiation of the acceptor HE charge has been carried out. Peculiarities of the wave processes in the water gap test assemblies, which can influence the results of sensitivity measurement, have been studied. In particular, it has been established that precursor waves in the walls of the gap test assemblies can influence the detonation transmission distance.

  9. SP-100 GES/NAT radiation shielding systems design and development testing

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Disney, R.K.; Kulikowski, H.D.; McGinnis, C.A.

    1991-01-10

    Advanced Energy Systems (AES) of Westinghouse Electric Corporation is under subcontract to the General Electric Company to supply nuclear radiation shielding components for the SP-100 Ground Engineering System (GES) Nuclear Assembly Test to be conducted at Westinghouse Hanford Company at Richland, Washington. The radiation shielding components are integral to the Nuclear Assembly Test (NAT) assembly and include prototypic and non-prototypic radiation shielding components which provide prototypic test conditions for the SP-100 reactor subsystem and reactor control subsystem components during the GES/NAT operations. W-AES is designing three radiation shield components for the NAT assembly; a prototypic Generic Flight System (GFS) shield,more » the Lower Internal Facility Shield (LIFS), and the Upper Internal Facility Shield (UIFS). This paper describes the design approach and development testing to support the design, fabrication, and assembly of these three shield components for use within the vacuum vessel of the GES/NAT. The GES/NAT shields must be designed to operate in a high vacuum which simulates space operations. The GFS shield and LIFS must provide prototypic radiation/thermal environments and mechanical interfaces for reactor system components. The NAT shields, in combination with the test facility shielding, must provide adequate radiation attenuation for overall test operations. Special design considerations account for the ground test facility effects on the prototypic GFS shield. Validation of the GFS shield design and performance will be based on detailed Monte Carlo analyses and developmental testing of design features. Full scale prototype testing of the shield subsystems is not planned.« less

  10. Assembler (elec. equip.) 826.884, Assembler, Electrical (elec. equip.) 826.884--Technical Report on Development of USTES Aptitude Test Battery.

    ERIC Educational Resources Information Center

    Manpower Administration (DOL), Washington, DC. U.S. Training and Employment Service.

    The United States Training and Employment Service General Aptitude Test Battery (GATB), first published in 1947, has been included in a continuing program of research to validate the tests against success in many different occupations. The GATB consists of 12 tests which measure nine aptitudes: General Learning Ability; Verbal Aptitude; Numerical…

  11. Guarded Flat Plate Cryogenic Test Apparatus and Calorimeter

    NASA Technical Reports Server (NTRS)

    Fesmire, James E. (Inventor); Johnson, Wesley L. (Inventor)

    2017-01-01

    A test apparatus for thermal energy measurement of disk-shaped test specimens has a cold mass assembly locatable within a sealable chamber with a guard vessel having a guard chamber to receive a liquid fluid and a bottom surface to contact a cold side of a test specimen, and a test vessel having a test chamber to receive a liquid fluid and encompassed on one side by a center portion of the bottom surface shared with the guard vessel. A lateral wall assembly of the test vessel is closed by a vessel top, the lateral wall assembly comprising an outer wall and an inner wall having opposing surfaces that define a thermal break including a condensable vapor pocket to inhibit heat transfer through the lateral wall from the guard vessel to the test vessel. A warm boundary temperature surface is in thermal communication with a lower surface of the test specimen.

  12. LPT. Shield test facility assembly and test building (TAN646). East ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    LPT. Shield test facility assembly and test building (TAN-646). East facade of ebor helium wing addition. Camera facing west. Note asbestos-cement siding on stair enclosure and upper-level. Concrete siding at lower level. Metal stack. Monorail protrudes from upper level of south wall at left of view. INEEL negative no. HD-40-7-4 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID

  13. ATM/cable arch and beam structural test program

    NASA Technical Reports Server (NTRS)

    Housley, J. A.

    1972-01-01

    The structural testing is described of an Apollo Telescope Mount (ATM) cable arch and beam assembly, using static loads to simulate the critical conditions expected during transportation and launch of the ATM. All test objectives were met. Stress and deflection data show that the assembly is structurally adequate for use in the ATM.

  14. Transfer orbit stage mechanisms thermal vacuum test

    NASA Technical Reports Server (NTRS)

    Oleary, Scott T.

    1990-01-01

    A systems level mechanisms test was conducted on the Orbital Sciences Corp.'s Transfer Orbit Stage (TOS). The TOS is a unique partially reusable transfer vehicle which will boost a satellite into its operational orbit from the Space Shuttle's cargo bay. The mechanical cradle and tilt assemblies will return to earth with the Space Shuttle while the Solid Rocket Motor (SRM) and avionics package are expended. A mechanisms test was performed on the forward cradle and aft tilting assemblies of the TOS under thermal vacuum conditions. Actuating these assemblies under a 1 g environment and thermal vacuum conditions proved to be a complex task. Pneumatic test fixturing was used to lift the forward cradle, and tilt the SRM, and avionics package. Clinometers, linear voltage displacement transducers, and load cells were used in the thermal vacuum chamber to measure the performance and characteristics of the TOS mechanism assembly. Incorporation of the instrumentation and pneumatic system into the test setup was not routine since pneumatic actuation of flight hardware had not been previously performed in the facility. The methods used are presented along with the problems experienced during the design, setup and test phases.

  15. PBF Reactor Building (PER620). Fuel rod test assembly is on ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PBF Reactor Building (PER-620). Fuel rod test assembly is on display at PBF. Date: 1982. INEEL negative no. 82-4893 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  16. View of parking (resting) frame that supported the Shuttle assembly ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    View of parking (resting) frame that supported the Shuttle assembly when the hydrodynamic supports were not engaged (removed from structure). - Marshall Space Flight Center, Saturn V Dynamic Test Facility, East Test Area, Huntsville, Madison County, AL

  17. Experimentally testing and assessing the predictive power of species assembly rules for tropical canopy ants

    PubMed Central

    Fayle, Tom M; Eggleton, Paul; Manica, Andrea; Yusah, Kalsum M; Foster, William A

    2015-01-01

    Understanding how species assemble into communities is a key goal in ecology. However, assembly rules are rarely tested experimentally, and their ability to shape real communities is poorly known. We surveyed a diverse community of epiphyte-dwelling ants and found that similar-sized species co-occurred less often than expected. Laboratory experiments demonstrated that invasion was discouraged by the presence of similarly sized resident species. The size difference for which invasion was less likely was the same as that for which wild species exhibited reduced co-occurrence. Finally we explored whether our experimentally derived assembly rules could simulate realistic communities. Communities simulated using size-based species assembly exhibited diversities closer to wild communities than those simulated using size-independent assembly, with results being sensitive to the combination of rules employed. Hence, species segregation in the wild can be driven by competitive species assembly, and this process is sufficient to generate observed species abundance distributions for tropical epiphyte-dwelling ants. PMID:25622647

  18. KSC-2009-3673

    NASA Image and Video Library

    2009-06-11

    CAPE CANAVERAL, Fla. – At the Assembly and Refurbishment Facility at NASA's Kennedy Space Center in Florida, Robert Lightfoot, acting center director of NASA's Marshall Space Flight Center, speaks to employees who were involved in the processing of the Ares I-X forward assembly (comprising the frustum, forward skirt extension and forward skirt) . The forward assembly is being moved to the Vehicle Assembly Building's High Bay 4 for processing and stacking to the upper stage. Ares I-X is the flight test for the Ares I which will provide NASA an early opportunity to test and prove hardware, facilities and ground operations associated with Ares I, which is part of the Constellation Program to return men to the moon and beyond. Launch of the Ares I-X flight test is targeted for August 2009. Photo credit: NASA/Jack Pfaller

  19. Special test equipment and fixturing for MSAT reflector assembly alignment

    NASA Technical Reports Server (NTRS)

    Young, Jeffrey A.; Zinn, Michael R.; Mccarten, David R.

    1994-01-01

    The MSAT Reflector Assembly is a state of the art subsystem for Mobile Satellite (MSAT), a geosynchronous-based commercial mobile telecommunication satellite program serving North America. The Reflector Assembly consisted of a deployable, three-hinge, folding-segment Boom, deployable 5.7 x 5.3-meter 16-rib Wrap-Rib Reflector, and a Reflector Pointing Mechanism (RPM). The MSAT spacecraft was based on a Hughes HS601 spacecraft bus carrying two Reflector Assemblies independently dedicated for L-band transmit and receive operations. Lockheed Missiles and Space Company (LMSC) designed and built the Reflector Assembly for MSAT under contract to SPAR Aerospace Ltd. Two MSAT satellites were built jointly by SPAR Aerospace Ltd. and Hughes Space and Communications Co. for this program, the first scheduled for launch in 1994. When scaled for wavelength, the assembly and alignment requirements for the Reflector Assembly were in many instances equivalent to or exceeded that of a diffraction-limited visible light optical system. Combined with logistical constraints inherent to large, compliant, lightweight structures; 'bolt-on' alignment; and remote, indirect spacecraft access; the technical challenges were formidable. This document describes the alignment methods, the special test equipment, and fixturing for Reflector Assembly assembly and alignment.

  20. 89. Neg. No. F126, Jul 21, 1931, INTERIORASSEMBLY BUILDING, SHOWING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    89. Neg. No. F-126, Jul 21, 1931, INTERIOR-ASSEMBLY BUILDING, SHOWING HEADLIGHT TESTING BOOTH - Ford Motor Company Long Beach Assembly Plant, Assembly Building, 700 Henry Ford Avenue, Long Beach, Los Angeles County, CA

  1. Structure Assembly by a Heterogeneous Team of Robots Using State Estimation, Generalized Joints, and Mobile Parallel Manipulators

    NASA Technical Reports Server (NTRS)

    Komendera, Erik E.; Adhikari, Shaurav; Glassner, Samantha; Kishen, Ashwin; Quartaro, Amy

    2017-01-01

    Autonomous robotic assembly by mobile field robots has seen significant advances in recent decades, yet practicality remains elusive. Identified challenges include better use of state estimation to and reasoning with uncertainty, spreading out tasks to specialized robots, and implementing representative joining methods. This paper proposes replacing 1) self-correcting mechanical linkages with generalized joints for improved applicability, 2) assembly serial manipulators with parallel manipulators for higher precision and stability, and 3) all-in-one robots with a heterogeneous team of specialized robots for agent simplicity. This paper then describes a general assembly algorithm utilizing state estimation. Finally, these concepts are tested in the context of solar array assembly, requiring a team of robots to assemble, bond, and deploy a set of solar panel mockups to a backbone truss to an accuracy not built into the parts. This paper presents the results of these tests.

  2. Necklace: combining reference and assembled transcriptomes for more comprehensive RNA-Seq analysis.

    PubMed

    Davidson, Nadia M; Oshlack, Alicia

    2018-05-01

    RNA sequencing (RNA-seq) analyses can benefit from performing a genome-guided and de novo assembly, in particular for species where the reference genome or the annotation is incomplete. However, tools for integrating an assembled transcriptome with reference annotation are lacking. Necklace is a software pipeline that runs genome-guided and de novo assembly and combines the resulting transcriptomes with reference genome annotations. Necklace constructs a compact but comprehensive superTranscriptome out of the assembled and reference data. Reads are subsequently aligned and counted in preparation for differential expression testing. Necklace allows a comprehensive transcriptome to be built from a combination of assembled and annotated transcripts, which results in a more comprehensive transcriptome for the majority of organisms. In addition RNA-seq data are mapped back to this newly created superTranscript reference to enable differential expression testing with standard methods.

  3. Development Specification for the Feedwater Supply Assembly (FSA), FSA-431 with Integrated Auxiliary Feedwater Supply Assembly (AFSA), FSA-531

    NASA Technical Reports Server (NTRS)

    Anchondo, Ian; Campbell, Colin

    2017-01-01

    The FSA with Integrated Aux FSA Specification establishes the requirements for design, performance, and testing of the FSA-431/FSA-531 assembly in compliance with CTSD-ADV-780, Development Specification for the Advanced EMU (AEMU) Portable Life Support System (PLSS). This section contains the technical design and performance requirements for the integrated assembly of the Feedwater Supply Assembly and Auxiliary Feedwater Supply Assembly for the Advanced EVA Development Portable Life Support Subsystem (PLSS).

  4. Integrated Advanced Microwave Sounding Unit-A (AMSU-A). Performance Verification Report: AMSU-A1 Antenna Drive Subsystem, PN 1331720-2, S/N 106

    NASA Technical Reports Server (NTRS)

    Luu, D.

    1999-01-01

    This is the Performance Verification Report, AMSU-A1 Antenna Drive Subsystem, P/N 1331720-2, S/N 106, for the Integrated Advanced Microwave Sounding Unit-A (AMSU-A). The antenna drive subsystem of the METSAT AMSU-A1, S/N 106, P/N 1331720-2, completed acceptance testing per A-ES Test Procedure AE-26002/lD. The test included: Scan Motion and Jitter, Pulse Load Bus Peak Current and Rise Time, Resolver Reading and Position Error, Gain/ Phase Margin, and Operational Gain Margin. The drive motors and electronic circuitry were also tested at the component level. The drive motor test includes: Starting Torque Test, Motor Commutation Test, Resolver Operation/ No-Load Speed Test, and Random Vibration. The electronic circuitry was tested at the Circuit Card Assembly (CCA) level of production; each test exercised all circuit functions. The transistor assembly was tested during the W3 cable assembly (1356941-1) test.

  5. Quality control of FWC during assembly and commissioning in SST-1 Tokamak

    NASA Astrophysics Data System (ADS)

    Patel, Hitesh; Santra, Prosenjit; Parekh, Tejas; Biswas, Prabal; Jayswal, Snehal; Chauhan, Pradeep; Paravastu, Yuvakiran; George, Siju; Semwal, Pratibha; Thankey, Prashant; Ramesh, Gattu; Prakash, Arun; Dhanani, Kalpesh; Raval, D. C.; Khan, Ziauddin; Pradhan, Subrata

    2017-04-01

    First Wall Components (FWC) of SST-1 tokamak, which are in the immediate vicinity of plasma, comprises of limiters, divertors, baffles, passive stabilizers designed to operate long duration (∼1000 s) discharges of elongated plasma. All FWC consist of copper alloy heat sink modules with SS cooling tubes brazed onto it, graphite tiles acting as armour material facing the plasma, and are mounted to the vacuum vessels with suitable Inconel support structures at inter-connected ring & port locations. The FWC are very recently assembled and commissioned successfully inside the vacuum vessel of SST-1 undergoing a rigorous quality control and checks at every stage of the assembly process. This paper will present the quality control aspects and checks of FWC from commencement of assembly procedure, namely material test reports, leak testing of high temperature baked components, assembled dimensional tolerances, leak testing of all welded joints, graphite tile tightening torques, electrical continuity and electrical isolation of passive stabilizers from vacuum vessel, baking and cooling hydraulic connections inside vacuum vessel.

  6. Runflat Testing

    DTIC Science & Technology

    2015-09-09

    guidance and procedures for testing the performance characteristics of runflat tires as equipped on ground vehicles. 15. SUBJECT TERMS runflat... tire assembly tread life combat flat central tire inflation system (CTIS) 16. SECURITY CLASSIFICATION OF: 17. LIMITATION...3 3.4 Tire Assemblies ..................................................................... 3 3.5 Environmental

  7. Measurements by a Vector Network Analyzer at 325 to 508 GHz

    NASA Technical Reports Server (NTRS)

    Fung, King Man; Samoska, Lorene; Chattopadhyay, Goutam; Gaier, Todd; Kangaslahti, Pekka; Pukala, David; Lau, Yuenie; Oleson, Charles; Denning, Anthony

    2008-01-01

    Recent experiments were performed in which return loss and insertion loss of waveguide test assemblies in the frequency range from 325 to 508 GHz were measured by use of a swept-frequency two-port vector network analyzer (VNA) test set. The experiments were part of a continuing effort to develop means of characterizing passive and active electronic components and systems operating at ever increasing frequencies. The waveguide test assemblies comprised WR-2.2 end sections collinear with WR-3.3 middle sections. The test set, assembled from commercially available components, included a 50-GHz VNA scattering- parameter test set and external signal synthesizers, augmented with recently developed frequency extenders, and further augmented with attenuators and amplifiers as needed to adjust radiofrequency and intermediate-frequency power levels between the aforementioned components. The tests included line-reflect-line calibration procedures, using WR-2.2 waveguide shims as the "line" standards and waveguide flange short circuits as the "reflect" standards. Calibrated dynamic ranges somewhat greater than about 20 dB for return loss and 35 dB for insertion loss were achieved. The measurement data of the test assemblies were found to substantially agree with results of computational simulations.

  8. Correlation of Hollow Cathode Assembly and Plasma Contactor Data from Ground Testing and In-Space Operation on the International Space Station

    NASA Technical Reports Server (NTRS)

    Kovalkeski, Scott D.; Patterson, Michael J.; Soulas, George C.

    2001-01-01

    Charge control on the International Space Station (ISS) is currently being provided by two plasma contactor units (PCUs). The plasma contactor includes a hollow cathode assembly (HCA), power processing unit and Xe gas feed system. The hollow cathode assemblies in use in the ISS plasma contactors were designed and fabricated at the NASA Glenn Research Center. Prequalification testing of development HCAs as well as acceptance testing of the flight HCAs is presented. Integration of the HCAs into the Boeing North America built PCU and acceptance testing of the PCU are summarized in this paper. Finally, data from the two on-orbit PCUs is presented.

  9. Mars Science Laboratory Spacecraft Assembled for Testing

    NASA Technical Reports Server (NTRS)

    2008-01-01

    The major components of NASA's Mars Science Laboratory spacecraft cruise stage atop the aeroshell, which has the descent stage and rover inside were connected together in October 2008 for several weeks of system testing, including simulation of launch vibrations and deep-space environmental conditions.

    These components will be taken apart again, for further work on each of them, after the environmental testing. The Mars Science Laboratory spacecraft is being assembled and tested for launch in 2011.

    This image was taken inside the Spacecraft Assembly Facility at NASA's Jet Propulsion Laboratory, Pasadena, Calif., which manages the Mars Science Laboratory Project for the NASA Science Mission Directorate, Washington. JPL is a division of the California Institute of Technology.

  10. Integrated Advanced Microwave Sounding Unit-A (AMSU-A). Engineering Test Report: METSAT A1 Signal Processor (P/N 1331670-2, S/N F03)

    NASA Technical Reports Server (NTRS)

    Lund, D.

    1998-01-01

    This report presents a description of tests performed, and the test data, for the A1 METSAT Signal Processor Assembly PN: 1331679-2, S/N F03. This assembly was tested in accordance with AE-26754, "METSAT Signal Processor Scan Drive Test and Integration Procedure." The objective is to demonstrate functionality of the signal processor prior to instrument integration.

  11. 30 CFR 7.311 - Approval checklist.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... MINING PRODUCTS TESTING BY APPLICANT OR THIRD PARTY Electric Motor Assemblies § 7.311 Approval checklist. Each motor assembly bearing an MSHA approval marking shall be accompanied by a list of items necessary for maintenance of the motor assembly as approved. ...

  12. 16 CFR 1512.14 - Requirements for fork and frame assembly.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 16 Commercial Practices 2 2011-01-01 2011-01-01 false Requirements for fork and frame assembly... assembly. The fork and frame assembly shall be tested for strength by application of a load of 890 N (200 lbf) or at least 39.5 J (350 in-lb) of energy, whichever results in the greater force, in accordance...

  13. 16 CFR 1512.14 - Requirements for fork and frame assembly.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 16 Commercial Practices 2 2014-01-01 2014-01-01 false Requirements for fork and frame assembly... assembly. The fork and frame assembly shall be tested for strength by application of a load of 890 N (200 lbf) or at least 39.5 J (350 in-lb) of energy, whichever results in the greater force, in accordance...

  14. 16 CFR 1512.14 - Requirements for fork and frame assembly.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Requirements for fork and frame assembly... assembly. The fork and frame assembly shall be tested for strength by application of a load of 890 N (200 lbf) or at least 39.5 J (350 in-lb) of energy, whichever results in the greater force, in accordance...

  15. 16 CFR 1512.14 - Requirements for fork and frame assembly.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 16 Commercial Practices 2 2012-01-01 2012-01-01 false Requirements for fork and frame assembly... assembly. The fork and frame assembly shall be tested for strength by application of a load of 890 N (200 lbf) or at least 39.5 J (350 in-lb) of energy, whichever results in the greater force, in accordance...

  16. PBF Reactor Building (PER620). Detail of fuel test assembly in ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PBF Reactor Building (PER-620). Detail of fuel test assembly in preparation for test. When complete, it will fit into in-pile tube. The maximum outside diameter of which must be about 8.25 inches. Date: 1982. INEEL negative no. 82-4908 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  17. Multidimensional Test Assembly Based on Lagrangian Relaxation Techniques. Research Report 98-08.

    ERIC Educational Resources Information Center

    Veldkamp, Bernard P.

    In this paper, a mathematical programming approach is presented for the assembly of ability tests measuring multiple traits. The values of the variance functions of the estimators of the traits are minimized, while test specifications are met. The approach is based on Lagrangian relaxation techniques and provides good results for the two…

  18. Flip Chip on Organic Substrates: A Feasibility Study for Space Applications

    DTIC Science & Technology

    2017-03-01

    scheme, a 1752 I/O land grid array (LGA) package with decoupling capacitors, heat sink and optional column attach [1] as shown in Figure 1...investigated the effect of moisture and current loading on the Class Y flip chip on ceramic reliability [ 2 ]. The UT1752FC Class Y technology has...chip assembly to ceramic test substrates, the FA10 die are assembled to build-up organic test substrates as shown in Figure 2 . These assemblies

  19. 10.2 Thermal-Structural Testing

    NASA Technical Reports Server (NTRS)

    Hudson, Larry D.

    2008-01-01

    Objective: Test a C/SiC Ruddervator Subcomponent under relevant thermal, mechanical & dynamic loading a) Thermal-structural mission cycling for re-entry and hypersonic cruise conditions; b) High-temperature modal survey to study the effect of heating on mode shapes, natural frequencies and damping. Supports NASA ARMD Hypersonics Material & Structures Program. Partners: NASA Dryden / Langley / Glenn, Lockheed-Martin, Materials Research & Design, GE CCP Test Phases - Phase 1: Acoustic-Vibration Testing (LaRC) completed - Phase 2: Thermal-Mechanical Testing (DFRC) in assembly - Phase 3: Mechanical Testing (DFRC) in assembly

  20. Fatigue tests on big structure assemblies of concorde aircraft

    NASA Technical Reports Server (NTRS)

    Nguyen, V. P.; Perrais, J. P.

    1972-01-01

    Fatigue tests on structural assemblies of the Concorde supersonic transport aircraft are reported. Two main sections of the aircraft were subjected to pressure, mechanical load, and thermal static tests. The types of fatigue tests conducted and the results obtained are discussed. It was concluded that on a supersonic aircraft whose structural weight is a significant part of the weight analysis, many fatigue and static strength development tests should be made and fatigue and thermal tests of the structures are absolutely necessary.

  1. Thermal/vacuum vs. thermal atmospheric testing of space flight electronic assemblies

    NASA Technical Reports Server (NTRS)

    Gibbel, Mark

    1990-01-01

    For space flight hardware, the thermal vacuum environmental test is the best test of a system's flight worthiness. Substituting an atmospheric pressure thermal test for a thermal/vacuum test can effectively reduce piece part temperatures by 20 C or more, even for low power density designs. Similar reductions in test effectiveness can also result from improper assembly level T/V test boundary conditions. The net result of these changes may reduce the effective test temperatures to the point where there is zero or negative margin over the flight thermal environment.

  2. Thermal vacuum life test facility for radioisotope thermoelectric generators

    NASA Astrophysics Data System (ADS)

    Deaton, R. L.; Goebel, C. J.; Amos, W. R.

    In the late 1970's, the Department of Energy (DOE) assigned Monsanto Research Corporation, Mound Facility, now operated by EG and G Mound Applied Technologies, the responsibility for assembling and testing General Purpose Heat Source (GPHS) radioisotope thermoelectric generators (RTGs). Assembled and tested were five RTGs, which included four flight units and one non-flight qualification unit. Figure 1 shows the RTG, which was designed by General Electric AstroSpace Division (GE/ASD) to produce 285 W of electrical power. A detailed description of the processes for RTG assembly and testing is presented by Amos and Goebel (1989). The RTG performance data are described by Bennett, et al., (1986). The flight units will provide electrical power for the National Aeronautics and Space Administration's (NASA) Galileo mission to Jupiter (two RTGs) and the joint NASA/European Space Agency (ESA) Ulysses mission to study the polar regions of the sun (one RTG). The remaining flight unit will serve as the spare for both missions, and a non-flight qualification unit was assembled and tested to ensure that performance criteria were adequately met.

  3. Integrated Advanced Microwave Sounding Unit-A (AMSU-A). Engineering Test Report: METSAT A1 Signal Processor (P/N: 1331670-2, S/N: F04)

    NASA Technical Reports Server (NTRS)

    Lund, D.

    1998-01-01

    This report presents a description of the tests performed, and the test data, for the A1 METSAT Signal Processor Assembly PN: 1331679-2, S/N F04. The assembly was tested in accordance with AE-26754, "METSAT Signal Processor Scan Drive Test and Integration Procedure." The objective is to demonstrate functionality of the signal processor prior to instrument integration.

  4. 30 CFR 7.45 - Critical characteristics

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... APPROVAL OF MINING PRODUCTS TESTING BY APPLICANT OR THIRD PARTY Battery Assemblies § 7.45 Critical characteristics The following critical characteristics shall be inspected or tested on each battery assembly to... terminations. (e) Strain relief devices for cables leaving boxes. (f) Type, location, and physical protection...

  5. 30 CFR 7.45 - Critical characteristics

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... APPROVAL OF MINING PRODUCTS TESTING BY APPLICANT OR THIRD PARTY Battery Assemblies § 7.45 Critical characteristics The following critical characteristics shall be inspected or tested on each battery assembly to... terminations. (e) Strain relief devices for cables leaving boxes. (f) Type, location, and physical protection...

  6. 30 CFR 7.45 - Critical characteristics

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... APPROVAL OF MINING PRODUCTS TESTING BY APPLICANT OR THIRD PARTY Battery Assemblies § 7.45 Critical characteristics The following critical characteristics shall be inspected or tested on each battery assembly to... terminations. (e) Strain relief devices for cables leaving boxes. (f) Type, location, and physical protection...

  7. Design and Analysis of the Aperture Shield Assembly for a Space Solar Receiver

    NASA Technical Reports Server (NTRS)

    Strumpf, Hal J.; Trinh, Tuan; Westelaken, William; Krystkowiak, Christopher; Avanessian, Vahe; Kerslake, Thomas W.

    1997-01-01

    A joint U.S./Russia program has been conducted to design, develop, fabricate, launch, and operate the world's first space solar dynamic power system on the Russian Space Station Mir. The goal of the program was to demonstrate and confirm that solar dynamic power systems are viable for future space applications such as the International Space Station (ISS). The major components of the system include a solar receiver, a closed Brayton cycle power conversion unit, a power conditioning and control unit, a solar concentrator, a radiator, a thermal control system, and a Space Shuttle carrier. Unfortunately, the mission was demanifested from the ISS Phase 1 Space Shuttle Program in 1996. However, NASA Lewis is proposing to use the fabricated flight hardware as part of an all-American flight demonstration on the ISS in 2002. The present paper concerns the design and analysis of the solar receiver aperture shield assembly. The aperture shield assembly comprises the front face of the cylindrical receiver and is located at the focal plane of the solar concentrator. The aperture shield assembly is a critical component that protects the solar receiver structure from highly concentrated solar fluxes during concentrator off-pointing events. A full-size aperture shield assembly was fabricated. This unit was essentially identical to the flight configuration, with the exception of materials substitution. In addition, a thermal shock test aperture shield assembly was fabricated. This test article utilized the flight materials and was used for high-flux testing in the solar simulator test rig at NASA Lewis. This testing is described in a companion paper.

  8. Alignment and assembly process for primary mirror subsystem of a spaceborne telescope

    NASA Astrophysics Data System (ADS)

    Lin, Wei-Cheng; Chang, Shenq-Tsong; Chang, Sheng-Hsiung; Chang, Chen-Peng; Lin, Yu-Chuan; Chin, Chi-Chieh; Pan, Hsu-Pin; Huang, Ting-Ming

    2015-11-01

    In this study, a multispectral spaceborne Cassegrain telescope was developed. The telescope was equipped with a primary mirror with a 450-mm clear aperture composed of Zerodur and lightweighted at a ratio of approximately 50% to meet both thermal and mass requirements. Reducing the astigmatism was critical for this mirror. The astigmatism is caused by gravity effects, the bonding process, and deformation from mounting the main structure of the telescope (main plate). This article presents the primary mirror alignment, mechanical ground-supported equipment (MGSE), assembly process, and optical performance test used to assemble the primary mirror. A mechanical compensated shim is used as the interface between the bipod flexure and main plate. The shim was used to compensate for manufacturer errors found in components and differences between local coplanarity errors to prevent stress while the bipod flexure was screwed to the main plate. After primary mirror assembly, an optical performance test method called a bench test with an algorithm was used to analyze the astigmatism caused by the gravity effect and deformation from the mounting or supporter. The tolerance conditions for the primary mirror assembly require the astigmatism caused by gravity and mounting force deformation to be less than P-V 0.02 λ at 632.8 nm. The results demonstrated that the designed MGSE used in the alignment and assembly processes met the critical requirements for the primary mirror assembly of the telescope.

  9. The lepidoptera as predictable communities of herbivores: a test of niche assembly using the moth communities of Morgan-Monroe State Forest

    Treesearch

    Keith S. Summerville; Michael R. Saunders; Jamie L. Lane

    2013-01-01

    The response of forest insect communities to disturbances such as timber harvest likely will depend on the underlying ecological assembly rules that affect community structure. Two competing hypotheses are niche assembly, which seeks to demonstrate significant species-environment correlations, and dispersal-assembly, which seeks to demonstrate spatial autocorrelation...

  10. 16 CFR § 1512.14 - Requirements for fork and frame assembly.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 16 Commercial Practices 2 2013-01-01 2013-01-01 false Requirements for fork and frame assembly. Â... assembly. The fork and frame assembly shall be tested for strength by application of a load of 890 N (200 lbf) or at least 39.5 J (350 in-lb) of energy, whichever results in the greater force, in accordance...

  11. Whole-Genome Sequencing and Assembly with High-Throughput, Short-Read Technologies

    PubMed Central

    Sundquist, Andreas; Ronaghi, Mostafa; Tang, Haixu; Pevzner, Pavel; Batzoglou, Serafim

    2007-01-01

    While recently developed short-read sequencing technologies may dramatically reduce the sequencing cost and eventually achieve the $1000 goal for re-sequencing, their limitations prevent the de novo sequencing of eukaryotic genomes with the standard shotgun sequencing protocol. We present SHRAP (SHort Read Assembly Protocol), a sequencing protocol and assembly methodology that utilizes high-throughput short-read technologies. We describe a variation on hierarchical sequencing with two crucial differences: (1) we select a clone library from the genome randomly rather than as a tiling path and (2) we sample clones from the genome at high coverage and reads from the clones at low coverage. We assume that 200 bp read lengths with a 1% error rate and inexpensive random fragment cloning on whole mammalian genomes is feasible. Our assembly methodology is based on first ordering the clones and subsequently performing read assembly in three stages: (1) local assemblies of regions significantly smaller than a clone size, (2) clone-sized assemblies of the results of stage 1, and (3) chromosome-sized assemblies. By aggressively localizing the assembly problem during the first stage, our method succeeds in assembling short, unpaired reads sampled from repetitive genomes. We tested our assembler using simulated reads from D. melanogaster and human chromosomes 1, 11, and 21, and produced assemblies with large sets of contiguous sequence and a misassembly rate comparable to other draft assemblies. Tested on D. melanogaster and the entire human genome, our clone-ordering method produces accurate maps, thereby localizing fragment assembly and enabling the parallelization of the subsequent steps of our pipeline. Thus, we have demonstrated that truly inexpensive de novo sequencing of mammalian genomes will soon be possible with high-throughput, short-read technologies using our methodology. PMID:17534434

  12. Fuel assembly shaker and truck test simulation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Klymyshyn, Nicholas A.; Jensen, Philip J.; Sanborn, Scott E.

    2014-09-30

    This study continues the modeling support of the SNL shaker table task from 2013 and includes analysis of the SNL 2014 truck test campaign. Detailed finite element models of the fuel assembly surrogate used by SNL during testing form the basis of the modeling effort. Additional analysis was performed to characterize and filter the accelerometer data collected during the SNL testing. The detailed fuel assembly finite element model was modified to improve the performance and accuracy of the original surrogate fuel assembly model in an attempt to achieve a closer agreement with the low strains measured during testing. The revisedmore » model was used to recalculate the shaker table load response from the 2013 test campaign. As it happened, the results remained comparable to the values calculated with the original fuel assembly model. From this it is concluded that the original model was suitable for the task and the improvements to the model were not able to bring the calculated strain values down to the extremely low level recorded during testing. The model needs more precision to calculate strains that are so close to zero. The truck test load case had an even lower magnitude than the shaker table case. Strain gage data from the test was compared directly to locations on the model. Truck test strains were lower than the shaker table case, but the model achieved a better relative agreement of 100-200 microstrains (or 0.0001-0.0002 mm/mm). The truck test data included a number of accelerometers at various locations on the truck bed, surrogate basket, and surrogate fuel assembly. This set of accelerometers allowed an evaluation of the dynamics of the conveyance system used in testing. It was discovered that the dynamic load transference through the conveyance has a strong frequency-range dependency. This suggests that different conveyance configurations could behave differently and transmit different magnitudes of loads to the fuel even when traveling down the same road at the same speed. It is recommended that the SNL conveyance system used in testing be characterized through modal analysis and frequency response analysis to provide context and assist in the interpretation of the strain data that was collected during the truck test campaign.« less

  13. Earth Sensor Assembly for the Tropical Rainfall Measuring Mission Observatory

    NASA Technical Reports Server (NTRS)

    Prince, Steven S.; Hoover, James M.

    1995-01-01

    EDO Corporation/Barnes Engineering Division (BED) has provided the Tropical Rainfall Measurement Mission (TRMM) Earth Sensor Assembly (ESA), a key element in the TRMM spacecraft's attitude control system. This report documents the history, design, fabrication, assembly, and test of the ESA.

  14. 30 CFR 7.43 - Application requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... APPROVAL OF MINING PRODUCTS TESTING BY APPLICANT OR THIRD PARTY Battery Assemblies § 7.43 Application requirements. (a) An application for approval of a battery assembly shall contain sufficient information to... the following information: (1) Overall dimensions of the battery assembly, including the minimum...

  15. 30 CFR 7.43 - Application requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... APPROVAL OF MINING PRODUCTS TESTING BY APPLICANT OR THIRD PARTY Battery Assemblies § 7.43 Application requirements. (a) An application for approval of a battery assembly shall contain sufficient information to... the following information: (1) Overall dimensions of the battery assembly, including the minimum...

  16. KSC-2009-3670

    NASA Image and Video Library

    2009-06-11

    CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, the Ares I-X forward assembly (comprising the frustum, forward skirt extension and forward skirt) begins to move out of the Assembly and Refurbishment Facility. It is being transferred to the Vehicle Assembly Building for stacking operations with other segments. Ares I-X is the flight test for the Ares I which will provide NASA an early opportunity to test and prove hardware, facilities and ground operations associated with Ares I, which is part of the Constellation Program to return men to the moon and beyond. Launch of the Ares I-X flight test is targeted for August 2009. Photo credit: NASA/Jack Pfaller

  17. KSC-2009-3669

    NASA Image and Video Library

    2009-06-11

    CAPE CANAVERAL, Fla. – In the Assembly and Refurbishment Facility at NASA's Kennedy Space Center in Florida, the Ares I-X forward assembly (comprising the frustum, forward skirt extension and forward skirt) is ready to be moved to the Vehicle Assembly Building for stacking operations with other segments. Ares I-X is the flight test for the Ares I which will provide NASA an early opportunity to test and prove hardware, facilities and ground operations associated with Ares I, which is part of the Constellation Program to return men to the moon and beyond. Launch of the Ares I-X flight test is targeted for August 2009. Photo credit: NASA/Jack Pfaller

  18. Lifetime predictions for dimmable two-channel drivers for color tuning luminaires

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Davis, Lynn; Smith, Aaron; Clark, Terry

    Two-channel tunable white lighting (TWL) systems represent the next wave of solid-state lighting (SSL) systems and promise flexibility in light environment while maintaining the high reliability and luminous efficacy expected with SSL devices. TWL systems utilize LED assemblies consisting of two different LED spectra (i.e., often a warm white assembly and a cool white assembly) that are integrated into modules. While these systems provide the ability to adjust the lighting spectrum to match the physiology needs of the task at hand, they also are a potentially more complex lighting system from a performance and reliability perspective. We report an initialmore » study on the reliability performance of such lighting systems including an examination of the lumen maintenance and chromaticity stability of warm white and cool white LED assemblies and the multi-channel driver that provides power to the assemblies. Accelerated stress tests including operational bake tests conducted at 75°C and 95°C were used to age the LED modules, while more aggressive temperature and humidity tests were used for the drivers in this study. Small differences in the performance between the two LED assemblies were found and can be attributed to the different phosphor chemistries. The lumen maintenances of both LED assemblies were excellent. The warm white LED assemblies were found to shift slightly in the green color direction over time while the cool white LED assemblies shifted slightly in the yellow color direction. The net result of these chromaticity shifts is a small, barely perceptible reduction in the tuning range after 6,000 hours of exposure to an accelerating elevated temperature of 75°C.« less

  19. Software design for automated assembly of truss structures

    NASA Technical Reports Server (NTRS)

    Herstrom, Catherine L.; Grantham, Carolyn; Allen, Cheryl L.; Doggett, William R.; Will, Ralph W.

    1992-01-01

    Concern over the limited intravehicular activity time has increased the interest in performing in-space assembly and construction operations with automated robotic systems. A technique being considered at LaRC is a supervised-autonomy approach, which can be monitored by an Earth-based supervisor that intervenes only when the automated system encounters a problem. A test-bed to support evaluation of the hardware and software requirements for supervised-autonomy assembly methods was developed. This report describes the design of the software system necessary to support the assembly process. The software is hierarchical and supports both automated assembly operations and supervisor error-recovery procedures, including the capability to pause and reverse any operation. The software design serves as a model for the development of software for more sophisticated automated systems and as a test-bed for evaluation of new concepts and hardware components.

  20. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Warren, Oden Lee; Asif, Syed Amanulla Syed; Oh, Yunje

    A testing instrument for mechanical testing at nano or micron scale includes a transducer body, and a coupling shaft coupled with a probe tip. A transducer body houses a capacitor. The capacitor includes first and second counter electrodes and a center electrode assembly interposed therebetween. The center electrode assembly is movable with the coupling shaft relative to the first and second counter electrodes, for instance in one or more of dimensions including laterally and normally. The center electrode assembly includes a center plate coupled with the coupling shaft and one or more springs extending from the center plate. Upper andmore » lower plates are coupled with the center plate and cover the center plate and the one or more springs. A shaft support assembly includes one or more support elements coupled along the coupling shaft. The shaft support assembly provides lateral support to the coupling shaft.« less

  1. Automated Simultaneous Assembly for Multistage Testing

    ERIC Educational Resources Information Center

    Breithaupt, Krista; Ariel, Adelaide; Veldkamp, Bernard P.

    2005-01-01

    This article offers some solutions used in the assembly of the computerized Uniform Certified Public Accountancy (CPA) licensing examination as practical alternatives for operational programs producing large numbers of forms. The Uniform CPA examination was offered as an adaptive multistage test (MST) beginning in April of 2004. Examples of…

  2. Design, fabrication and test of the RL10 derivative II chamber/primary nozzle

    NASA Technical Reports Server (NTRS)

    Marable, R. W.

    1989-01-01

    The design, fabrication and test of the RL10-II chamber/primary nozzle was accomplished as part of the RL10 Product Improvement Program (PIP). The overall goal of the RL10 PIP was to gain the knowledge and experience necessary to develop new cryogenic upper stage engines to fulfill future NASA requirements. The goal would be reached by producing an RL10 engine designed to be reusable, operate at several thrust levels, and have increased performance. The goals for the chamber/primary nozzle task were: (1) to design a reusable assembly capable of operation at increased mixture ratio and low thrust; (2) to fabricate three assemblies using new or updated techniques where possible; and (3) to test one assembly to verify the design and construction. The design and fabrication phases produced an assembly having improved features such as single piece reinforcing band segments (i.e., Mae West segments) and relocated tube exit braze joints (i.e., hooked tube exit). In addition, a computer program was developed to design the chamber tubes to meet both performance and heat transfer requirements. The test phase showed the specific impulse of the test bed engine system to be as predicted. These results, along with the heat transfer data obtained, sufficiently proved the overall design of the RL10-II recontoured and shortened chamber/primary nozzle assembly.

  3. Integrated Advanced Microwave Sounding Unit-A(AMSU-A). Engineering Test Report: METSAT A1 Signal Processor, (P/N 1331670-2, S /N F05)

    NASA Technical Reports Server (NTRS)

    Lund, D.

    1998-01-01

    This report presents a description of the tests performed, and the test data, for the AI METSAT Signal Processor Assembly P/N 1331670-2, S/N F05. The assembly was tested in accordance with AE-26754, "METSAT Signal Processor Scan Drive and Integration Procedure." The objective is to demonstrate functionality of the signal processor prior to instrument integration.

  4. Thematic mapper flight model preshipment review data package. Volume 4: Appendix. Part B: Scan mirror assembly data

    NASA Technical Reports Server (NTRS)

    1982-01-01

    Data from the thematic mapper scan mirror assembly (SMA) acceptance test are presented. Documentation includes: (1) a list of the acceptance test discrepancies; (2) flight 1 SMA test data book; (3) flight 1 SMA environmental report; (4) the configuration verification index; (5) the flight 1 SMA test failure reports; (6) the flight 1 data tapes log; and (7) the requests for deviation/waivers.

  5. Evaluation, construction and endurance testing of compression sealed pyrolytic boron nitride slot insulation

    NASA Technical Reports Server (NTRS)

    Grant, W. L.

    1969-01-01

    A high-temperature statorette, consisting of an iron-27 percent cobalt magnetic lamination stack and nickel-clad silver conductors, was tested with pyrolytic boron nitride slot insulation. Temperatures were measured in each test to determine characteristics of slot linear heat conductance from statorette conductors. Testing was carried out to temperatures of approximately 1500 F in a vacuum environment of 10-8 torr. Three assemblies were built and tested, each having a different room temperature slot clearance. The final statorette assembly was subjected to a 100-hour vacuum aging test at 1400 F followed by 25 thermal cycles. Temperature data from the three assemblies showed that decreasing slot clearance and increasing compression loading did enhance heat transfer. The temperature difference between slot and lamination at 1400 F increased 4 F during the thermal aging and an additional 10 F during the 25 thermal cycles.

  6. Nanomechanical testing system

    DOEpatents

    Vodnick, David James; Dwivedi, Arpit; Keranen, Lucas Paul; Okerlund, Michael David; Schmitz, Roger William; Warren, Oden Lee; Young, Christopher David

    2014-07-08

    An automated testing system includes systems and methods to facilitate inline production testing of samples at a micro (multiple microns) or less scale with a mechanical testing instrument. In an example, the system includes a probe changing assembly for coupling and decoupling a probe of the instrument. The probe changing assembly includes a probe change unit configured to grasp one of a plurality of probes in a probe magazine and couple one of the probes with an instrument probe receptacle. An actuator is coupled with the probe change unit, and the actuator is configured to move and align the probe change unit with the probe magazine and the instrument probe receptacle. In another example, the automated testing system includes a multiple degree of freedom stage for aligning a sample testing location with the instrument. The stage includes a sample stage and a stage actuator assembly including translational and rotational actuators.

  7. Nanomechanical testing system

    DOEpatents

    Vodnick, David James; Dwivedi, Arpit; Keranen, Lucas Paul; Okerlund, Michael David; Schmitz, Roger William; Warren, Oden Lee; Young, Christopher David

    2015-01-27

    An automated testing system includes systems and methods to facilitate inline production testing of samples at a micro (multiple microns) or less scale with a mechanical testing instrument. In an example, the system includes a probe changing assembly for coupling and decoupling a probe of the instrument. The probe changing assembly includes a probe change unit configured to grasp one of a plurality of probes in a probe magazine and couple one of the probes with an instrument probe receptacle. An actuator is coupled with the probe change unit, and the actuator is configured to move and align the probe change unit with the probe magazine and the instrument probe receptacle. In another example, the automated testing system includes a multiple degree of freedom stage for aligning a sample testing location with the instrument. The stage includes a sample stage and a stage actuator assembly including translational and rotational actuators.

  8. Nanomechanical testing system

    DOEpatents

    Vodnick, David James; Dwivedi, Arpit; Keranen, Lucas Paul; Okerlund, Michael David; Schmitz, Roger William; Warren, Oden Lee; Young, Christopher David

    2015-02-24

    An automated testing system includes systems and methods to facilitate inline production testing of samples at a micro (multiple microns) or less scale with a mechanical testing instrument. In an example, the system includes a probe changing assembly for coupling and decoupling a probe of the instrument. The probe changing assembly includes a probe change unit configured to grasp one of a plurality of probes in a probe magazine and couple one of the probes with an instrument probe receptacle. An actuator is coupled with the probe change unit, and the actuator is configured to move and align the probe change unit with the probe magazine and the instrument probe receptacle. In another example, the automated testing system includes a multiple degree of freedom stage for aligning a sample testing location with the instrument. The stage includes a sample stage and a stage actuator assembly including translational and rotational actuators.

  9. Analyses of the Integration of Carbon Dioxide Removal Assembly, Compressor, Accumulator and Sabatier Carbon Dioxide Reduction Assembly

    NASA Technical Reports Server (NTRS)

    Jeng, Frank F.; Lafuse, Sharon; Smith, Frederick D.; Lu, Sao-Dung; Knox, James C.; Campbell, Mellssa L.; Scull, Timothy D.; Green Steve

    2010-01-01

    A tool has been developed by the Sabatier Team for analyzing/optimizing CO2 removal assembly, CO2 compressor size, its operation logic, water generation from Sabatier, utilization of CO2 from crew metabolic output, and Hz from oxygen generation assembly. Tests had been conducted using CDRA/Simulation compressor set-up at MSFC in 2003. Analysis of test data has validated CO2 desorption rate profile, CO2 compressor performance, CO2 recovery and CO2 vacuum vent in CDRA desorption. Optimizing the compressor size and compressor operation logic for an integrated closed air revitalization system Is being conducted by the Sabatier Team.

  10. Evaluation of beryllium for space shuttle components

    NASA Technical Reports Server (NTRS)

    Trapp, A. E.

    1972-01-01

    Application of beryllium to specific full-scale space shuttle structural components and assemblies was studied. Material evaluations were conducted to check the mechanical properties of as-received material to gain design information on characteristics needed for the material in the space shuttle environment, and to obtain data needed for evaluating component and panel tests. Four beryllium structural assemblies were analyzed and designed. Selected components of these assemblies, representing areas of critical loading or design/process uncertainty, were designed and tested, and two panel assemblies were fabricated. Trends in cost and weight factors were determined by progressive estimation at key points of preliminary design, final design, and fabrication to aid in a cost/weight evaluation of the use of beryllium.

  11. Fiber Optic Cable Assemblies for Space Flight 2: Thermal and Radiation Effects

    NASA Technical Reports Server (NTRS)

    Ott, Melanie N.

    1998-01-01

    Goddard Space Flight Center is conducting a search for space flight worthy fiber optic cable assemblies that will benefit all projects at all of the NASA centers. This paper is number two in a series of papers being issued as a result of this task to define and qualify space grade fiber optic cable assemblies. Though to qualify and use a fiber optic cable in space requires treatment of the cable assembly as a system, it is very important to understand the design and behavior of its parts. This paper addresses that need, providing information on cable components shrinkage testing and radiation testing results from recent experiments at Goddard Space Flight Center.

  12. Method of preforming and assembling superconducting circuit elements

    NASA Astrophysics Data System (ADS)

    Haertling, Gene H.; Buckley, John D.

    1991-03-01

    The invention is a method of preforming and pretesting rigid and discrete superconductor circuit elements to optimize the superconductivity development of the preformed circuit element prior to its assembly, and encapsulation on a substrate and final environmental testing of the assembled ceramic superconductive elements.

  13. Track-train dynamic analysis and test program, truck static test

    NASA Technical Reports Server (NTRS)

    Nemes, A. G.

    1974-01-01

    A series of tests were conducted to define the characteristics of an ASF 11 Ride Truck Assembly including joint slop, friction and stiffness. Loading to the truck assembly included vertical load to simulate the car/pool loading combined with lateral or moment loading that resulted in desired truck deflections for the various phases of testing. All seven test conditions were successfully completed with load and deflection data being collected. No attempt is made to reduce the applicable data other than to provide computer plots.

  14. Force Tests of a 1/5-Scale Model of the McDonnell XP-85 Airplane with Conventional Tail Assembly in the Langley Free-Flight Tunnel

    NASA Technical Reports Server (NTRS)

    Paulson, John W.; Johnson, Joseph L.

    1947-01-01

    At the request of the Air Materiel Command, Army Air Forces an investigation of the low-speed, power-off stability and control characteristics of the McDonnell XP-85 airplane is being conducted in the Langley free-flight tunnel. The XP-85 airplane is a parasite fighter carried in a bomb bay of the B-36 airplane. As a part of the investigation a few force tests were made of a 1/5 scale model of the XP-85 with a conventional tail assembly installed in place of the original design five-unit tail assembly. The total area of the conventional assembly was approximately 80 percent of the area of the five-unit assembly. The results of this investigation showed that the conventional tail assembly gave about the same longitudinal stability characteristics as the original configuration and improved the directional and lateral stability.

  15. Functional Testing of the Space Station Plasma Contactor

    NASA Technical Reports Server (NTRS)

    Patterson, Michael J.; Hamley, John A.; Sarver-Verhey, Timothy R.; Soulas, George C.

    1995-01-01

    A plasma contactor system has been baselined for the International Space Station Alpha (ISSA) to control the electrical potentials of surfaces to eliminate/mitigate damaging interactions with the space environment. The system represents a dual-use technology which is a direct outgrowth of the NASA electric propulsion program and, in particular, the technology development effort on ion thruster systems. The plasma contactor subsystems include a hollow cathode assembly, a power electronics unit, and an expellant management unit. Under a pre-flight development program these subsystems are being developed to the level of maturity appropriate for transfer to U.S. industry for final development. Development efforts for the hollow cathode assembly include design selection and refinement, validating its required lifetime, and quantifying the cathode performance and interface specifications. To date, cathode components have demonstrated over 10,000 hours lifetime, and a hollow cathode assembly has demonstrated over 3,000 ignitions. Additionally, preliminary integration testing of a hollow cathode assembly with a breadboard power electronics unit has been completed. This paper discusses test results and the development status of the plasma contactor subsystems for ISSA, and in particular, the hollow cathode assembly.

  16. Centroid Detector Assembly for the AXAF-I Alignment Test System

    NASA Technical Reports Server (NTRS)

    Glenn, Paul

    1995-01-01

    The High Resolution Mirror Assembly (HRMA) of the Advanced X-ray Astrophysics Facility (imaging) (AXAF-I) consists of four nested paraboloids and four nested hyperboloids, all of meter-class size, and all of which are to be assembled and aligned in a special 15 meter tower at Eastman Kodak Company in Rochester, NY. The goals of the alignment are (1) to make the images of the four telescopes coincident; (2) to remove coma from each image individually; and (3) to control and determine the final position of the composite focus. This will be accomplished by the HRMA Aligment Test System (HATS) which is essentially a scanning Hartmann test system. The scanning laser source and the focal plane of the HATS are part of the Centroid Detector Assembly (CDA) which also includes processing electronics and software. In this paper we discuss the design and the measured performance of the CDA.

  17. Failure Simulation Testing of the Z-1 Spacesuit Titanium Bearing Assemblies

    NASA Technical Reports Server (NTRS)

    de Baca, Richard C.; Juarez, Alfredo; Peralta, Stephen; Tylka, Jonathan; Rhodes, Richard

    2016-01-01

    The Z-2 is a candidate for NASA's next generation spacesuit, designed for a range of possible missions with enhanced mobility for spacewalks both on planetary surfaces and in microgravity. Increased mobility was accomplished through innovations in shoulder and hip joints, using a number of new bearings to allow spacesuit wearers to dip, walk, and bend with ease; all important tasks for a planetary explorer collecting samples or traveling over rough terrain. The Advanced Spacesuit Development Team of NASA Johnson Space Center requested that the NASA White Sands Test Facility (WSTF) perform a series failure simulation tests on three titanium bearing assemblies, an elemental part of the joint construction used in new spacesuit designs. This testing simulated two undetected failures within the bearings and as a result the objective of this test program was to evaluate whether a failed or failing bearing could result in ignition of the titanium race material due to friction. The first failure was an inner seal leak sufficient to pressurize the race with +99 percent oxygen. The second failure was an improperly installed or mismatched ball port that created a protrusion in the ball bearing race, partially obstructing the nominal rolling path of each ball bearing. When the spacesuit bearings are assembled, bearing balls are loaded into the assembly via a ball port. The ball port is specific and unique to each bearing assembly (matched pair). The simulated mismatched ball port is a significant source of friction, which would be caused by an assembly error. To evaluate this risk, the bearings were cycled in a simulated worst-case scenario environment, with operational loads, and potential flaw conditions. During test the amount of actuation torque required and heat generated through continuous operation were measured and the bearings were observed for sparks or burning events. This paper provides detailed descriptions of the test hardware, methodology, and results.

  18. The thin-wall tube drift chamber operating in vacuum (prototype)

    NASA Astrophysics Data System (ADS)

    Alexeev, G. D.; Glonti, L. N.; Kekelidze, V. D.; Malyshev, V. L.; Piskun, A. A.; Potrbenikov, Yu. K.; Rodionov, V. K.; Samsonov, V. A.; Tokmenin, V. V.; Shkarovskiy, S. N.

    2013-08-01

    The goal of this work was to design drift tubes and a chamber operating in vacuum, and to develop technologies for tubes independent assembly and mounting in the chamber. These design and technology were tested on the prototype. The main features of the chamber are the following: the drift tubes are made of flexible mylar film (wall thickness 36 μm, diameter 9.80 mm, length 2160 mm) using ultrasonic welding along the generatrix; the welding device and methods were developed at JINR. Drift tubes with end plugs, anode wires and spacers were completely assembled outside the chamber. "Self-centering" spacers and bushes were used for precise setting of the anode wires and tubes. The assembled tubes were sealed with O-rings in their seats in the chamber which simplified the chamber assembling. Moreover the tube assembly and the chamber manufacture can be performed independently and in parallel; this sufficiently reduces the total time of chamber manufacture and assembling, its cost and allows tubes to be tested outside the chamber. The technology of independent tube assembling is suitable for a chamber of any shape but a round chamber is preferable for operation in vacuum. Single channel amplifier-discriminator boards which are more stable against cross talks were used for testing the tubes. Independently assembled tubes were mounted into the chamber prototype and its performance characteristic measured under the vacuum conditions. The results showed that both the structure and the tubes themselves normally operate. They are suitable for making a full-scale drift chamber for vacuum.

  19. The Conceptual Design for a Fuel Assembly of a New Research Reactor

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ryu, J-S.; Cho, Y-G.; Yoon, D-B.

    2004-10-06

    A new Research Reactor (ARR) has been under design by KAERI since 2002. In this work, as a first step for the design of the fuel assembly of the ARR, the conceptual design has been carried out. The vibration characteristics of the tubular fuel model and the locking performance of the preliminary designed locking devices were investigated. In order to investigate the effects of the stiffener on the vibration characteristics of the tubular fuel, a modal analysis was performed for the finite element models of the tubular fuels with stiffeners and without stiffeners. The analysis results show that the vibrationmore » characteristics of the tubular fuel with stiffeners are better than those of the tubular fuel without stiffeners. To investigate the locking performance of the preliminary designed locking devices for the fuel assembly of the ARR, the elements of the locking devices were fabricated. Then the torsional resistance, fixing status and vibration characteristics of the locking devices were tested. The test results show that using the locking device with fins on the bottom guide can prevent the torsional motion of the fuel assembly, and that additional springs or guides on the top of the fuel assembly are needed to suppress the lateral motion of the fuel assembly. Based on the modal analysis and experimental results, the fuel assembly and locking devices of the ARR were designed and its prototype was fabricated. The locking performance, pressure drop characteristics and vibration characteristics of the newly designed fuel assembly will be tested in the near future.« less

  20. Skylab communications carrier 16536G and filter bypass adapter assembly 12535G. [development of communications equipment for use with Skylab spacecraft

    NASA Technical Reports Server (NTRS)

    1974-01-01

    Communications equipment for use with the Skylab project is examined to show compliance with contract requirements. The items of equipment considered are: (1) communications carrier assemblies, (2) filter bypass adapter assemblies, and (3) sub-assemblies, parts, and repairs. Additional information is provided concerning contract requirements, test requirements, and failure investigation actions.

  1. ENDF/B-VII.0 Data Testing Using 1,172 Critical Assemblies

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Plechaty, E F; Cullen, D E

    2007-10-01

    In order to test the ENDF/B-VII.0 neutron data library [1], 1,172 critical assemblies from [2] have been calculated using the Monte Carlo transport code TART [3]. TART's 'best' physics was used for all of these calculations; this included continuous energy cross sections, delayed neutrons in their spectrum that is slower than prompt neutrons, unresolved resonance region self-shielding, the thermal scattering (free atom for all materials plus thermal scattering law data S({alpha},{beta}) when available). In this first pass through the assemblies the objective was to 'quickly' test the validity of the ENDF/B-VII.0 data [1], the assembly models as defined in [2]more » and coded for use with TART, and TART's physics treatment [3] of these assemblies. With TART we have the option of running criticality problems until K-eff has been calculated to an acceptable input accuracy. In order to 'quickly' calculate all of these assemblies K-eff was calculated in each case to +/- 0.002. For these calculations the assemblies were divided into ten types based on fuel (mixed, Pu239, U233, U235) and median fission energy (Fast, Midi, Slow). A table is provided that shows a summary of these results. This is followed be details for every assembly, and statistical information about the distribution of K-eff for each type of assembly. After a review of these results to eliminate any obvious errors in ENDF/B data, assembly models, or TART physics, all assemblies will be run again to a higher precision. Only after this second run is finished will we have highly precise results. Until then the results presently here should only be interpreted as approximate values of K-eff with a standard deviation of +/- 0.002; for such a large number of assemblies we expected the results to be approximately normal, with a spread out to several times the standard deviation; see the calculated statistical distributions and their comparisons to a normal distribution.« less

  2. Data compression/error correction digital test system. Appendix 3: Maintenance. Book 2: Receiver assembly drawings

    NASA Technical Reports Server (NTRS)

    1972-01-01

    The assembly drawings of the receiver unit are presented for the data compression/error correction digital test system. Equipment specifications are given for the various receiver parts, including the TV input buffer register, delta demodulator, TV sync generator, memory devices, and data storage devices.

  3. 42 CFR 84.1102 - Examination, inspection and testing of complete respirator assemblies; fees.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 1 2011-10-01 2011-10-01 false Examination, inspection and testing of complete respirator assemblies; fees. 84.1102 Section 84.1102 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES OCCUPATIONAL SAFETY AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF...

  4. 42 CFR 84.1102 - Examination, inspection and testing of complete respirator assemblies; fees.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 1 2014-10-01 2014-10-01 false Examination, inspection and testing of complete respirator assemblies; fees. 84.1102 Section 84.1102 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES OCCUPATIONAL SAFETY AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF...

  5. 42 CFR 84.1102 - Examination, inspection and testing of complete respirator assemblies; fees.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 1 2013-10-01 2013-10-01 false Examination, inspection and testing of complete respirator assemblies; fees. 84.1102 Section 84.1102 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES OCCUPATIONAL SAFETY AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF...

  6. 42 CFR 84.1102 - Examination, inspection and testing of complete respirator assemblies; fees.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 1 2012-10-01 2012-10-01 false Examination, inspection and testing of complete respirator assemblies; fees. 84.1102 Section 84.1102 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES OCCUPATIONAL SAFETY AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF...

  7. 42 CFR 84.1102 - Examination, inspection and testing of complete respirator assemblies; fees.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Examination, inspection and testing of complete respirator assemblies; fees. 84.1102 Section 84.1102 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES OCCUPATIONAL SAFETY AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF...

  8. 49 CFR 572.194 - Shoulder.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Shoulder. 572.194 Section 572.194 Transportation..., Small Adult Female § 572.194 Shoulder. (a) The shoulder structure is part of the upper torso assembly shown in drawing 180-3000. For the shoulder impact test, the dummy is tested as a complete assembly...

  9. 49 CFR 572.194 - Shoulder.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Shoulder. 572.194 Section 572.194 Transportation..., Small Adult Female § 572.194 Shoulder. (a) The shoulder structure is part of the upper torso assembly shown in drawing 180-3000. For the shoulder impact test, the dummy is tested as a complete assembly...

  10. 49 CFR 572.194 - Shoulder.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Shoulder. 572.194 Section 572.194 Transportation..., Small Adult Female § 572.194 Shoulder. (a) The shoulder structure is part of the upper torso assembly shown in drawing 180-3000. For the shoulder impact test, the dummy is tested as a complete assembly...

  11. 49 CFR 572.194 - Shoulder.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 7 2011-10-01 2011-10-01 false Shoulder. 572.194 Section 572.194 Transportation..., Small Adult Female § 572.194 Shoulder. (a) The shoulder structure is part of the upper torso assembly shown in drawing 180-3000. For the shoulder impact test, the dummy is tested as a complete assembly...

  12. Computer Aided Tests.

    ERIC Educational Resources Information Center

    Steinke, Elisabeth

    An approach to using the computer to assemble German tests is described. The purposes of the system would be: (1) an expansion of the bilingual lexical memory bank to list and store idioms of all degrees of difficulty, with frequency data and with complete and sophisticated retrieval possibility for assembly; (2) the creation of an…

  13. 49 CFR 572.142 - Head assembly and test procedure.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... acceleration versus time history curve shall be unimodal, and the oscillations occurring after the main pulse... for testing. (3) Suspend the head assembly with its midsagittal plane in vertical orientation as shown... head in transverse alignment with the CG, shall be used to ensure that the head transverse plane is...

  14. Assembly and Testing of a Compact, Lightweight Homopolar Generator Power Supply

    DTIC Science & Technology

    1983-06-01

    ASSEMBLY AND TESTING OF A COMPACT, LIGHTWEIGHT HOMOPOLAR GENERATOR POWER SUPPLY J. H. Gully Center for Electromechanics The University of Texas...portable systems. The initial step in developing the power supply was to design, fabricate and test a prototype homopolar generator, attempting to...levels. SUPPORT STRUCTURE HYDRAULIC Fig. 1. Section through compact homopolar generator ~1 l-oot!:__ __ 63.80 ----~ (25. 12) ~------ 85.88

  15. CERCA LEU fuel assemblies testing in Maria Reactor - safety analysis summary and testing program scope.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pytel, K.; Mieleszczenko, W.; Lechniak, J.

    2010-03-01

    The presented paper contains neutronic and thermal-hydraulic (for steady and unsteady states) calculation results prepared to support annex to Safety Analysis Report for MARIA reactor in order to obtain approval for program of testing low-enriched uranium (LEU) lead test fuel assemblies (LTFA) manufactured by CERCA. This includes presentation of the limits and operational constraints to be in effect during the fuel testing investigations. Also, the scope of testing program (which began in August 2009), including additional measurements and monitoring procedures, is described.

  16. Flow Accelerated Corrosion of Carbon Steel in the Feedwater System of PWR Plants - Behaviour of Welds and Weld Assemblies

    NASA Astrophysics Data System (ADS)

    Mansour, C.; Pavageau, E. M.; Faucher, A.; Inada, F.; Yoneda, K.; Miller, C.; Bretelle, J.-L.

    Flow Accelerated Corrosion (FAC) of carbon steel is a phenomenon that has been studied for many years. However, to date, the specific behavior of welds and weld assemblies of carbon steel towards this phenomenon has been scarcely examined. An experimental program of FAC of welds and weld assemblies is being conducted by EDF and CRIEPI. This paper describes the results obtained on the behavior of weld metal independently of its behavior in a weld assembly as well as the sensitivity to FAC of various weld assembly configurations. Tests are performed, at EDF, in the CIROCO loop which permits to follow the FAC rate by gammametry measurements, and at CRIEPI, in the PRINTEMPS loop where FAC is measured by laser displacement sensor. Welds are performed by two different methods: Submerged Arc Welding (SAW) and Gas Tungsten Arc Welding (GTAW). The influence of several parameters on FAC of welds is examined: welding method, chromium content and temperature. For weld assemblies, only the impact of chromium content is studied. All the tests are conducted in ammonia medium at pH 9.0 and oxygen concentration lower then 1 ppb. Chemical parameters, as the pH, the conductivity and oxygen concentration, are measured in situ during the test and surface characterizations are performed after the test. The results show that, with more than 0.15% chromium, no FAC is detected on the weld metal, which is similar to the base metal behaviour. For the same and lower chromium content, the two types of metal have the same FAC rate. Concerning the temperature effect, for both metals FAC rate decreases with temperature increase above 150°C. Below 150 °C, their behaviour seems to be different. For weld assemblies, the study of different configurations shows that the chromium content is the main parameter affecting the behaviour of the specimens. Additional tests and modeling studies will be conducted in order to complete the results.

  17. 30 CFR 7.42 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... MINING PRODUCTS TESTING BY APPLICANT OR THIRD PARTY Battery Assemblies § 7.42 Definitions. The following definitions apply in this subpart: Battery assembly. A unit or units consisting of cells and their electrical connections, assembled in a battery box or boxes with covers. Battery box. The exterior sides, bottom, and...

  18. 78 FR 27951 - Foreign-Trade Zone (FTZ) 75-Phoenix, Arizona; Notification of Proposed Production Activity...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-13

    ... systems; duct temperature limiters; air/oil heat exchangers; oil cooler fans; fuel filter assemblies... assemblies; filter extractors; de- coupler/disassembly wrenches; torque wrench adaptors; test benches; drills...; filter assemblies; oil filter install kits; cartridge screens; filter housings; trim balance weights...

  19. 30 CFR 7.309 - Approval marking.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... MINING PRODUCTS TESTING BY APPLICANT OR THIRD PARTY Electric Motor Assemblies § 7.309 Approval marking. Each approved motor assembly shall be identified by a legible and permanent approval plate inscribed.... The plate shall be securely attached to the motor assembly in a manner that does not impair any...

  20. Simulation of the Dynamic Environment for Missile Component Testing: Demonstration

    DTIC Science & Technology

    1989-09-15

    are most suitable for large cmmwn carriers such as large conventional trucks and flatbed transport vehicles. Nevertheless, as demnstrated in the same...ASSEMBLY " IA 11716775 LAMINATED ROTOR PALLET ASSEMBLY ASSEMBLY 11716771 11715757 RETAINiNG 11718476 ..° I DETENT ROTOR SRNG EBC 11718423; 11718477

  1. 30 CFR 7.42 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... MINING PRODUCTS TESTING BY APPLICANT OR THIRD PARTY Battery Assemblies § 7.42 Definitions. The following definitions apply in this subpart: Battery assembly. A unit or units consisting of cells and their electrical connections, assembled in a battery box or boxes with covers. Battery box. The exterior sides, bottom, and...

  2. 30 CFR 7.42 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... MINING PRODUCTS TESTING BY APPLICANT OR THIRD PARTY Battery Assemblies § 7.42 Definitions. The following definitions apply in this subpart: Battery assembly. A unit or units consisting of cells and their electrical connections, assembled in a battery box or boxes with covers. Battery box. The exterior sides, bottom, and...

  3. Assembly of cucumber (Cucumis sativus L.) somaclones

    NASA Astrophysics Data System (ADS)

    Skarzyńska, Agnieszka; Kuśmirek, Wiktor; Pawełkowicz, Magdalena; PlÄ der, Wojciech; Nowak, Robert M.

    2017-08-01

    The development of next generation sequencing opens the possibility of using sequencing in various plant studies, such as finding structural changes and small polymorphisms between species and within them. Most analyzes rely on genomic sequences and it is crucial to use well-assembled genomes of high quality and completeness. Herein we compare commonly available programs for genomic assembling and newly developed software - dnaasm. Assemblies were tested on cucumber (Cucumis sativus L.) lines obtained by in vitro regeneration (somaclones), showing different phenotypes. Obtained results shows that dnaasm assembler is a good tool for short read assembly, which allows obtaining genomes of high quality and completeness.

  4. Characteristics of work actions of shoe manufacturing assembly line workers and a cross-sectional factor-control study on occupational cervicobrachial disorders.

    PubMed

    Amano, M; Umeda, G; Nakajima, H; Yatsuki, K

    1988-01-01

    The characteristic work actions of female shoe manufacturing assembly line workers were analyzed by the records of 8-mm cine-films. The relationship between cervicobrachial disorders and work actions was investigated as a cross-sectional factor control study by using sex-age matched pairs for non-assembly line workers (102 pairs). The following conclusions were obtained: 1) The assembly line workers handled about 3,400 sneaker shoes per day on the assembly line. A completed shoe weighed 200-500 g. The metal last weighted 400-1,200 g. As the lines were not completely mechanized, the workers passed shoes to the next worker by hand. 2) In the line selected for the study of work actions, 28 female workers and one male worker were engaged. The work direction of the line was one-way (from left to right or vice versa). The actions of the workers were classified into four fundamental actions: i) grasping the shoe or tool, ii) extending or iii) bending of the arms, and iv) keeping the arms in a certain position. These fundamental actions were repeated more than 3,400 times per day by each worker. The time spent in holding a shoe in the left hand was longer than that of the right hand in holding a shoe or tool. 3) Results of medical examinations showed a higher prevalence in assembly line workers than that in non-assembly line workers. Especially the prevalence rate of tapping test, pain sensibility test, vibratory sensibility test, Morley's test, tenosynovitis in the fingers, tenderness at spinal muscle around the thoracic vertebrae, levator muscle of scapula, trapezius muscle, rhomboid muscle, infraspinatus muscle, greater pectoral muscle, anterior scalene muscle, thenar eminence, biceps muscle of arm, brachioradial muscle, and antebrachial flexor muscle were found to be different significantly by McNemar's test between the two groups. These disorders were appeared in the left shoulder, arm and hand. 4) As the non-assembly line workers were not engaged in compulsory work or in one-way work direction, they injured the right side (skillful side). On the contrary, it is considered that compulsory transfer of shoes and one-way work direction imposes a heavier load on the left side of the body in assembly line workers, and consequently they injured the left side more severely. 5) It is concluded that the sustained task of handing over shoes to the next worker or one-way work direction caused cervicobrachial disorders of assembly line workers, especially on the left side of the body.

  5. Methane Post-Processor Development to Increase Oxygen Recovery beyond State-of-the-Art Carbon Dioxide Reduction Technology

    NASA Technical Reports Server (NTRS)

    Abney, Morgan; Miller, Lee; Greenwood, Zach; Iannantuono, Michelle; Jones, Kenny

    2013-01-01

    State-of-the-art life support carbon dioxide (CO2) reduction technology, based on the Sabatier reaction, is theoretically capable of 50% recovery of oxygen from metabolic CO2. This recovery is constrained by the limited availability of reactant hydrogen. Post-processing of the methane byproduct from the Sabatier reactor results in hydrogen recycle and a subsequent increase in oxygen recovery. For this purpose, a Methane Post-Processor Assembly containing three sub-systems has been developed and tested. The assembly includes a Methane Purification Assembly (MePA) to remove residual CO2 and water vapor from the Sabatier product stream, a Plasma Pyrolysis Assembly (PPA) to partially pyrolyze methane into hydrogen and acetylene, and an Acetylene Separation Assembly (ASepA) to purify the hydrogen product for recycle. The results of partially integrated testing of the sub-systems are reported.

  6. Methane Post-Processor Development to Increase Oxygen Recovery beyond State-of-the-Art Carbon Dioxide Reduction Technology

    NASA Technical Reports Server (NTRS)

    Abney, Morgan B.; Greenwood, Zachary; Miller, Lee A.; Alvarez, Giraldo; Iannantuono, Michelle; Jones, Kenny

    2013-01-01

    State-of-the-art life support carbon dioxide (CO2) reduction technology, based on the Sabatier reaction, is theoretically capable of 50% recovery of oxygen from metabolic CO2. This recovery is constrained by the limited availability of reactant hydrogen. Post-processing of the methane byproduct from the Sabatier reactor results in hydrogen recycle and a subsequent increase in oxygen recovery. For this purpose, a Methane Post-Processor Assembly containing three sub-systems has been developed and tested. The assembly includes a Methane Purification Assembly (MePA) to remove residual CO2 and water vapor from the Sabatier product stream, a Plasma Pyrolysis Assembly (PPA) to partially pyrolyze methane into hydrogen and acetylene, and an Acetylene Separation Assembly (ASepA) to purify the hydrogen product for recycle. The results of partially integrated testing of the sub-systems are reported

  7. Method and apparatus for deflection measurements using eddy current effects

    NASA Astrophysics Data System (ADS)

    Chern, Engmin J.

    1993-05-01

    A method and apparatus for inserting and moving a sensing assembly with a mechanical positioning assembly to a desired remote location of a surface of a specimen under test and measuring angle and/or deflection by sensing the change in the impedance of at least one sensor coil located in a base plate which has a rotatable conductive plate pivotally mounted thereon so as to uncover the sensor coil(s) whose impedance changes as a function of deflection away from the center line of the base plate in response to the movement of the rotator plate when contacting the surface of the specimen under test is presented. The apparatus includes the combination of a system controller, a sensing assembly, an eddy current impedance measuring apparatus, and a mechanical positioning assembly driven by the impedance measuring apparatus to position the sensing assembly at a desired location of the specimen.

  8. Method and apparatus for deflection measurements using eddy current effects

    NASA Technical Reports Server (NTRS)

    Chern, Engmin J. (Inventor)

    1993-01-01

    A method and apparatus for inserting and moving a sensing assembly with a mechanical positioning assembly to a desired remote location of a surface of a specimen under test and measuring angle and/or deflection by sensing the change in the impedance of at least one sensor coil located in a base plate which has a rotatable conductive plate pivotally mounted thereon so as to uncover the sensor coil(s) whose impedance changes as a function of deflection away from the center line of the base plate in response to the movement of the rotator plate when contacting the surface of the specimen under test is presented. The apparatus includes the combination of a system controller, a sensing assembly, an eddy current impedance measuring apparatus, and a mechanical positioning assembly driven by the impedance measuring apparatus to position the sensing assembly at a desired location of the specimen.

  9. Mariner Venus/Mercury 1973 rocket engine assembly

    NASA Technical Reports Server (NTRS)

    Snoke, D. R.; Williams, R. S.

    1972-01-01

    The fabrication and test of rocket engine assemblies (REA) for Mariner Venus/Mercury 1973 are reported. The fabrication, assembly and flight acceptance test of seven REA's including the type approval test of one engine and fabrication of one additional kit consisting of detail parts for an engine ready for catalyst loading are presented. The MV/M '73 REA which is a nominal 51 lbs thrust monopropellant engine is described. Under steady state operation the specific impulse is not less than 228 lb-sec at 55 lb and 218.5 lb-sec at 10 lb thrust varying linearly between these limits. The characteristic velocity is not less than 4100 ft/sec at any thrust level.

  10. KSC-2009-3675

    NASA Image and Video Library

    2009-06-11

    CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, the Ares I-X forward assembly comprising the frustum, forward skirt extension and forward skirt , at left, moves toward the Vehicle Assembly Building, in the background. In the VAB's High Bay 4, the forward assembly will undergo processing and stacking to the upper stage. Ares I-X is the flight test for the Ares I which will provide NASA an early opportunity to test and prove hardware, facilities and ground operations associated with Ares I, which is part of the Constellation Program to return men to the moon and beyond. Launch of the Ares I-X flight test is targeted for August 2009. Photo credit: NASA/Jack Pfaller

  11. KSC-2009-3671

    NASA Image and Video Library

    2009-06-11

    CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, the Ares I-X forward assembly (comprising the frustum, forward skirt extension and forward skirt) moves out of the Assembly and Refurbishment Facility. It is being transferred to the Vehicle Assembly Building's High Bay 4 for processing and stacking to the upper stage. Ares I-X is the flight test for the Ares I which will provide NASA an early opportunity to test and prove hardware, facilities and ground operations associated with Ares I, which is part of the Constellation Program to return men to the moon and beyond. Launch of the Ares I-X flight test is targeted for August 2009. Photo credit: NASA/Jack Pfaller

  12. KSC-2009-3676

    NASA Image and Video Library

    2009-06-11

    CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, the Ares I-X forward assembly comprising the frustum, forward skirt extension and forward skirt heads for the Vehicle Assembly Building, in the background. In the VAB's High Bay 4, the forward assembly will undergo processing and stacking to the upper stage. Ares I-X is the flight test for the Ares I which will provide NASA an early opportunity to test and prove hardware, facilities and ground operations associated with Ares I, which is part of the Constellation Program to return men to the moon and beyond. Launch of the Ares I-X flight test is targeted for August 2009. Photo credit: NASA/Jack Pfaller

  13. KSC-2009-3677

    NASA Image and Video Library

    2009-06-11

    CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, the Ares I-X forward assembly comprising the frustum, forward skirt extension and forward skirt moves into the transfer aisle of the Vehicle Assembly Building. The assembly will be placed in the VAB's High Bay 4 where it will undergo processing and stacking to the upper stage. Ares I-X is the flight test for the Ares I which will provide NASA an early opportunity to test and prove hardware, facilities and ground operations associated with Ares I, which is part of the Constellation Program to return men to the moon and beyond. Launch of the Ares I-X flight test is targeted for August 2009. Photo credit: NASA/Jack Pfaller

  14. 30 CFR 7.51 - Approval checklist.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... MINING PRODUCTS TESTING BY APPLICANT OR THIRD PARTY Battery Assemblies § 7.51 Approval checklist. Each battery assembly bearing an MSHA approval plate shall be accompanied by a description of what is necessary to maintain the battery assembly as approved. [53 FR 23500, June 22, 1988, as amended at 60 FR 33723...

  15. 49 CFR 572.181 - General description.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... assembly Drawing number Head Assembly 175-1000 Neck Assembly Test/Cert 175-2000 Neck Bracket Including..., dated February 2008. (c) Weights of body segments (head, neck, upper and lower torso, arms and upper and... the convenience of the user, the added and revised text is set forth as follows: § 572.181 General...

  16. Liquid rocket valve assemblies

    NASA Technical Reports Server (NTRS)

    1973-01-01

    The design and operating characteristics of valve assemblies used in liquid propellant rocket engines are discussed. The subjects considered are as follows: (1) valve selection parameters, (2) major design aspects, (3) design integration of valve subassemblies, and (4) assembly of components and functional tests. Information is provided on engine, stage, and spacecraft checkout procedures.

  17. 30 CFR 7.51 - Approval checklist.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... MINING PRODUCTS TESTING BY APPLICANT OR THIRD PARTY Battery Assemblies § 7.51 Approval checklist. Each battery assembly bearing an MSHA approval plate shall be accompanied by a description of what is necessary to maintain the battery assembly as approved. [53 FR 23500, June 22, 1988, as amended at 60 FR 33723...

  18. 30 CFR 7.52 - New technology.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... MINING PRODUCTS TESTING BY APPLICANT OR THIRD PARTY Battery Assemblies § 7.52 New technology. MSHA may approve a battery assembly that incorporates technology for which the requirements of this subpart are not applicable, if the Agency determines that the battery assembly is as safe as those which meet the...

  19. 30 CFR 7.52 - New technology.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... MINING PRODUCTS TESTING BY APPLICANT OR THIRD PARTY Battery Assemblies § 7.52 New technology. MSHA may approve a battery assembly that incorporates technology for which the requirements of this subpart are not applicable, if the Agency determines that the battery assembly is as safe as those which meet the...

  20. 30 CFR 7.51 - Approval checklist.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... MINING PRODUCTS TESTING BY APPLICANT OR THIRD PARTY Battery Assemblies § 7.51 Approval checklist. Each battery assembly bearing an MSHA approval plate shall be accompanied by a description of what is necessary to maintain the battery assembly as approved. [53 FR 23500, June 22, 1988, as amended at 60 FR 33723...

  1. Pretest predictions for degraded shutdown heat-removal tests in THORS-SHRS Assembly 1. [LMFBR

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rose, S.D.; Carbajo, J.J.

    The recent modification of the Thermal-Hydraulic Out-of-Reactor Safety (THORS) facility at ORNL will allow testing of parallel simulated fuel assemblies under natural-convection and low-flow forced-convection conditions similar to those that might occur during a partial failure of the Shutdown Heat Removal System (SHRS) of an LMFBR. An extensive test program has been prepared and testing will be started in September 1983. THORS-SHRS Assembly 1 consists of two 19-pin bundles in parallel with a third leg serving as a bypass line and containing a sodium-to-sodium intermediate heat exchanger. Testing at low powers wil help indicate the maximum amount of heat thatmore » can be removed from the reactor core during conditions of degraded shutdown heat removal. The thermal-hydraulic behavior of the test bundles will be characterized for single-phase and two-phase conditions up to dryout. The influence of interassembly flow redistribution including transients from forced- to natural-convection conditions will be investigated during testing.« less

  2. Test systems of the STS-XYTER2 ASIC: from wafer-level to in-system verification

    NASA Astrophysics Data System (ADS)

    Kasinski, Krzysztof; Zubrzycka, Weronika

    2016-09-01

    The STS/MUCH-XYTER2 ASIC is a full-size prototype chip for the Silicon Tracking System (STS) and Muon Chamber (MUCH) detectors in the new fixed-target experiment Compressed Baryonic Matter (CBM) at FAIR-center, Darmstadt, Germany. The STS assembly includes more than 14000 ASICs. The complicated, time-consuming, multi-step assembly process of the detector building blocks and tight quality assurance requirements impose several intermediate testing to be performed for verifying crucial assembly steps (e.g. custom microcable tab-bonding before wire-bonding to the PCB) and - if necessary - identifying channels or modules for rework. The chip supports the multi-level testing with different probing / contact methods (wafer probe-card, pogo-probes, in-system tests). A huge number of ASICs to be tested restricts the number and kind of tests possible to be performed within a reasonable time. The proposed architectures of test stand equipment and a brief summary of methodologies are presented in this paper.

  3. KSC-2009-4134

    NASA Image and Video Library

    2009-07-15

    CAPE CANAVERAL, Fla. – A crane is attached to the Ares I-X forward center assembly in NASA Kennedy Space Center's Vehicle Assembly Building. It will be mated with the aft center assembly. Part of the Constellation Program, the Ares I-X is the test vehicle for the Ares I, which is the essential core of a space transportation system that eventually will carry crewed missions back to the moon, on to Mars and out into the solar system . The Ares I-X flight test is targeted for no earlier than Aug. 30. Photo credit: NASA/Troy Cryder

  4. Small-scale grassland assembly patterns differ above and below the soil surface.

    PubMed

    Price, Jodi N; Hiiesalu, Inga; Gerhold, Pille; Pärtel, Meelis

    2012-06-01

    The existence of deterministic assembly rules for plant communities remains an important and unresolved topic in ecology. Most studies examining community assembly have sampled aboveground species diversity and composition. However, plants also coexist belowground, and many coexistence theories invoke belowground competition as an explanation for aboveground patterns. We used next-generation sequencing that enables the identification of roots and rhizomes from mixed-species samples to measure coexisting species at small scales in temperate grasslands. We used comparable data from above (conventional methods) and below (molecular techniques) the soil surface (0.1 x 0.1 x 0.1 m volume). To detect evidence for nonrandom patterns in the direction of biotic or abiotic assembly processes, we used three assembly rules tests (richness variance, guild proportionality, and species co-occurrence indices) as well as pairwise association tests. We found support for biotic assembly rules aboveground, with lower variance in species richness than expected and more negative species associations. Belowground plant communities were structured more by abiotic processes, with greater variability in richness and guild proportionality than expected. Belowground assembly is largely driven by abiotic processes, with little evidence for competition-driven assembly, and this has implications for plant coexistence theories that are based on competition for soil resources.

  5. Power Reactant Storage Assembly (PRSA) (Space Shuttle). PRSA hydrogen and oxygen DVT tank refurbishment

    NASA Technical Reports Server (NTRS)

    1993-01-01

    The Power Reactant Storage Assembly (PRSA) liquid hydrogen Development Verification Test (H2 DVT) tank assembly (Beech Aircraft Corporation P/N 15548-0116-1, S/N 07399000SHT0001) and liquid oxygen (O2) DVT tank assembly (Beech Aircraft Corporation P/N 15548-0115-1, S/N 07399000SXT0001) were refurbished by Ball Electro-Optics and Cryogenics Division to provide NASA JSC, Propulsion and Power Division, the capability of performing engineering tests. The refurbishments incorporated the latest flight configuration hardware and avionics changes necessary to make the tanks function like flight articles. This final report summarizes these refurbishment activities. Also included are up-to-date records of the pressure time and cycle histories.

  6. Backward assembly planning with DFA analysis

    NASA Technical Reports Server (NTRS)

    Lee, Sukhan (Inventor)

    1995-01-01

    An assembly planning system that operates based on a recursive decomposition of assembly into subassemblies, and analyzes assembly cost in terms of stability, directionality, and manipulability to guide the generation of preferred assembly plans is presented. The planning in this system incorporates the special processes, such as cleaning, testing, labeling, etc. that must occur during the assembly, and handles nonreversible as well as reversible assembly tasks through backward assembly planning. In order to increase the planning efficiency, the system avoids the analysis of decompositions that do not correspond to feasible assembly tasks. This is achieved by grouping and merging those parts that can not be decomposable at the current stage of backward assembly planning due to the requirement of special processes and the constraint of interconnection feasibility. The invention includes methods of evaluating assembly cost in terms of the number of fixtures (or holding devices) and reorientations required for assembly, through the analysis of stability, directionality, and manipulability. All these factors are used in defining cost and heuristic functions for an AO* search for an optimal plan.

  7. Automated Simultaneous Assembly of Multistage Testlets for a High-Stakes Licensing Examination

    ERIC Educational Resources Information Center

    Breithaupt, Krista; Hare, Donovan R.

    2007-01-01

    Many challenges exist for high-stakes testing programs offering continuous computerized administration. The automated assembly of test questions to exactly meet content and other requirements, provide uniformity, and control item exposure can be modeled and solved by mixed-integer programming (MIP) methods. A case study of the computerized…

  8. Lead-Free vs Tin-Lead Reliability of Advanced Electronic Assemblies

    NASA Technical Reports Server (NTRS)

    Ghaffarian, Reza

    2005-01-01

    This presentation will provide the technical background and specific information published in literature related to reliability test, analyses, modeling, and associated issues for lead-free solder package assemblies in comparison to their tin-lead solder alloys. It also presents current understanding of lead-free thermal cycle test performance in support.

  9. 49 CFR 572.134 - Thorax assembly and test procedure.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... completely assembled dummy (drawing 880105-000) is impacted by a test probe conforming to section 572.137(a...). Within this specified compression corridor, the peak force, measured by the impact probe as defined in... midsagittal plane so that the impact point of the longitudinal centerline of the probe coincides with the...

  10. 49 CFR 572.134 - Thorax assembly and test procedure.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... completely assembled dummy (drawing 880105-000) is impacted by a test probe conforming to section 572.137(a...). Within this specified compression corridor, the peak force, measured by the impact probe as defined in... midsagittal plane so that the impact point of the longitudinal centerline of the probe coincides with the...

  11. 49 CFR 572.134 - Thorax assembly and test procedure.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... completely assembled dummy (drawing 880105-000) is impacted by a test probe conforming to section 572.137(a...). Within this specified compression corridor, the peak force, measured by the impact probe as defined in... midsagittal plane so that the impact point of the longitudinal centerline of the probe coincides with the...

  12. 49 CFR 572.174 - Thorax assembly and test procedure.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... assembled dummy (drawing 420-0000) (incorporated by reference, see § 572.170) is impacted by a test probe... this specified compression corridor, the peak force, measured by the impact probe as defined in section... midsagittal plane so that the impact point of the longitudinal centerline of the probe coincides with the...

  13. 49 CFR 572.134 - Thorax assembly and test procedure.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... completely assembled dummy (drawing 880105-000) is impacted by a test probe conforming to section 572.137(a...). Within this specified compression corridor, the peak force, measured by the impact probe as defined in... midsagittal plane so that the impact point of the longitudinal centerline of the probe coincides with the...

  14. 49 CFR 572.174 - Thorax assembly and test procedure.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... assembled dummy (drawing 420-0000) (incorporated by reference, see § 572.170) is impacted by a test probe... this specified compression corridor, the peak force, measured by the impact probe as defined in section... midsagittal plane so that the impact point of the longitudinal centerline of the probe coincides with the...

  15. 49 CFR 572.174 - Thorax assembly and test procedure.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... assembled dummy (drawing 420-0000) (incorporated by reference, see § 572.170) is impacted by a test probe... this specified compression corridor, the peak force, measured by the impact probe as defined in section... midsagittal plane so that the impact point of the longitudinal centerline of the probe coincides with the...

  16. A Binary Programming Approach to Automated Test Assembly for Cognitive Diagnosis Models

    ERIC Educational Resources Information Center

    Finkelman, Matthew D.; Kim, Wonsuk; Roussos, Louis; Verschoor, Angela

    2010-01-01

    Automated test assembly (ATA) has been an area of prolific psychometric research. Although ATA methodology is well developed for unidimensional models, its application alongside cognitive diagnosis models (CDMs) is a burgeoning topic. Two suggested procedures for combining ATA and CDMs are to maximize the cognitive diagnostic index and to use a…

  17. Some of the test team for the Gulfstream Quiet Spike project assembled for a group photo on May 3, 2006

    NASA Image and Video Library

    2006-05-03

    Some of the test team for the Gulfstream Quiet Spike project assembled for a group photo on May 3, 2006. The project seeks to verify the structural integrity of the multi-segmented, articulating spike attachment designed to reduce and control a sonic boom.

  18. Design, development, test, and evaluation of an automated analytical electrophoresis apparatus

    NASA Technical Reports Server (NTRS)

    Bartels, P. A.; Bier, M.

    1977-01-01

    An Automated Analytical Electrophoresis Apparatus (AAEA) was designed, developed, assembled, and preliminarily tested. The AAEA was demonstrated to be a feasible apparatus for automatically acquiring, displaying, and storing (and eventually analyzing) electrophoresis mobility data from living blood cells. The apparatus and the operation of its major assemblies are described in detail.

  19. Construction of a standard test assembly for controlled laser studies in tissues: Preliminary study on human bone material

    NASA Astrophysics Data System (ADS)

    Beer, Franziska; Passow, Harald

    2008-02-01

    The aim of the study is the construction of a test assembly, which facilitates objective, comparative studies on the cutting performance of lasers in hard tissue. To ensure the applicability of our own construction for the reproducible performance of laser incisions in hard tissue, eleven freshly extracted blocks (2×1.5cm2) of human bone were prepared with a Er,Cr:YSGG laser by using a handheld handpiece, respectively, using the constructed device for a standardized cutting. A total of 44 cuts were executed. The specimen were then histologically evaluated. The standard test assembly met the requirements concerning the provision of objective results. The findings of the histological evaluation prove the reproducibility of the results. The standard test assembly presented in this paper facilitates comparative studies of different laser systems by reducing subjective influence on the preparation to a minimum. The results of this preliminary study show that the precision of the guiding instrument for laser cutting reduces the error of cut width by 50-fold, from 50to1μm.

  20. The effects of simulated bone loss on the implant-abutment assembly and likelihood of fracture: an in vitro study.

    PubMed

    Manzoor, Behzad; Suleiman, Mahmood; Palmer, Richard M

    2013-01-01

    The crestal bone level around a dental implant may influence its strength characteristics by offering protection against mechanical failures. Therefore, the present study investigated the effect of simulated bone loss on modes, loads, and cycles to failure in an in vitro model. Different amounts of bone loss were simulated: 0, 1.5, 3.0, and 4.5 mm from the implant head. Forty narrow-diameter (3.0-mm) implant-abutment assemblies were tested using compressive bending and cyclic fatigue testing. Weibull and accelerated life testing analysis were used to assess reliability and functional life. Statistical analyses were performed using the Fisher-Exact test and the Spearman ranked correlation. Compressive bending tests showed that the level of bone loss influenced the load-bearing capacity of implant-abutment assemblies. Fatigue testing showed that the modes, loads, and cycles to failure had a statistically significant relationship with the level of bone loss. All 16 samples with bone loss of 3.0 mm or more experienced horizontal implant body fractures. In contrast, 14 of 16 samples with 0 and 1.5 mm of bone loss showed abutment and screw fractures. Weibull and accelerated life testing analysis indicated a two-group distribution: the 0- and 1.5-mm bone loss samples had better functional life and reliability than the 3.0- and 4.5-mm samples. Progressive bone loss had a significant effect on modes, loads, and cycles to failure. In addition, bone loss influenced the functional life and reliability of the implant-abutment assemblies. Maintaining crestal bone levels is important in ensuring biomechanical sustainability and predictable long-term function of dental implant assemblies.

  1. Test results of an organic Rankine-cycle power module for a small community solar thermal power experiment

    NASA Technical Reports Server (NTRS)

    Clark, T. B.

    1985-01-01

    The organic Rankine-cycle (ORC) power conversion assembly was tested. Qualification testing of the electrical transport subsystem was also completed. Test objectives were to verify compatibility of all system elements with emphasis on control of the power conversion assembly, to evaluate the performance and efficiency of the components, and to validate operating procedures. After 34 hours of power generation under a wide range of conditions, the net module efficiency exceeded 18% after accounting for all parasitic losses.

  2. Finisher, Hand (toys & games) 9-13.01; Gluer (toys & games) 9-13.01; Laborer (toys & games) 9-13.01; Plastic-Toy Assembler (toys & games) 7-13.012; Toy Assembler (toys & games) 7-13.012--Technical Report on Standardization of the General Aptitude Test Battery.

    ERIC Educational Resources Information Center

    Manpower Administration (DOL), Washington, DC. U.S. Training and Employment Service.

    The United States Training and Employment Service General Aptitude Test Battery (GATB), first published in 1947, has been included in a continuing program of research to validate the tests against success in many different occupations. The GATB consists of 12 tests which measure nine aptitudes: General Learning Ability; Verbal Aptitude; Numerical…

  3. The Clouds and the Earth's Radiant Energy System Elevation Bearing Assembly Life Test

    NASA Technical Reports Server (NTRS)

    Brown, Phillip L.; Miller, James B.; Jones, William R., Jr.; Rasmussen, Kent; Wheeler, Donald R.; Rana, Mauro; Peri, Frank

    1999-01-01

    The Clouds and the Earth's Radiant Energy System (CERES) elevation scan bearings lubricated with Pennzane SHF X2000 and 2% lead naphthenate (PbNp) were life tested for a seven-year equivalent Low Earth Orbit (LEO) operation. The bearing life assembly was tested continuously at an accelerated and normal rate using the scanning patterns developed for the CERES Earth Observing System AM-1 mission. A post-life-test analysis was performed on the collected data, bearing wear, and lubricant behavior.

  4. Advanced Space Transportation Program (ASTP)

    NASA Image and Video Library

    1997-08-07

    This double exposure depicts Marshall Space Flight Center's (MSFC) Test Stand 116 hosting a 60K Bantam Fastrac thrust chamber assembly test. The lower right exposure shows the engine firing in the test stand while the center exposure reveals workers monitoring the test in the interior block house of the test facility. The thrust chamber assembly is only part of the Fastrac engine project to build a low-cost engine for the X-34, an alternate light-weight unmarned launch vehicle. Both the nozzle and the engine for Fastrac are being manufactured at MSFC.

  5. Trait-based assembly and phylogenetic structure in northeast Pacific rockfish assemblages.

    PubMed

    Ingram, Travis; Shurin, Jonathan B

    2009-09-01

    If natural communities are assembled according to deterministic rules, coexisting species will represent a nonrandom subset of the potential species pool. We tested for signatures of assembly rules in the distribution of species' traits in Pacific rockfish (Sebastes spp.) assemblages. We used morphology, dietary niche (estimated with stable nitrogen isotopes), and distribution data to identify traits that relate to local-scale resource use (the alpha-niche) and to environmental gradients (the beta-niche). We showed that gill raker morphology was related to trophic position (an alpha-niche axis), while relative eye size was associated with depth habitat (a beta-niche axis). We therefore hypothesized that, within assemblages of coexisting rockfish species, the gill raker trait would be overdispersed (evenly spaced) due to limiting similarity, while relative eye size would be clustered due to environmental filtering. We examined the evolutionary relatedness of coexisting species to ask whether phylogenetic community structure and trait distributions gave similar indications about the roles of assembly processes. We tested the trait distributions and phylogenetic structure of 30 published rockfish assemblages against a null model of random community assembly. As predicted, the gill raker trait tended to be more evenly spaced than expected by chance, as did overall body size, while relative eye size was more clustered than expected. Phylogenetic community structure appeared to reflect historical dispersal and speciation and did not provide consistent support for assembly rules. Our results indicate that rockfish community assembly is nonrandom with regard to species' traits and show how distinguishing traits related to the alpha- and beta-niches and incorporating functional morphology can provide for powerful tests of assembly rules.

  6. Alignment of optical system components using an ADM beam through a null assembly

    NASA Technical Reports Server (NTRS)

    Hayden, Joseph E. (Inventor); Olczak, Eugene G. (Inventor)

    2010-01-01

    A system for testing an optical surface includes a rangefinder configured to emit a light beam and a null assembly located between the rangefinder and the optical surface. The null assembly is configured to receive and to reflect the emitted light beam toward the optical surface. The light beam reflected from the null assembly is further reflected back from the optical surface toward the null assembly as a return light beam. The rangefinder is configured to measure a distance to the optical surface using the return light beam.

  7. Strategies for optimizing BioNano and Dovetail explored through a second reference quality assembly for the legume model, Medicago truncatula.

    PubMed

    Moll, Karen M; Zhou, Peng; Ramaraj, Thiruvarangan; Fajardo, Diego; Devitt, Nicholas P; Sadowsky, Michael J; Stupar, Robert M; Tiffin, Peter; Miller, Jason R; Young, Nevin D; Silverstein, Kevin A T; Mudge, Joann

    2017-08-04

    Third generation sequencing technologies, with sequencing reads in the tens- of kilo-bases, facilitate genome assembly by spanning ambiguous regions and improving continuity. This has been critical for plant genomes, which are difficult to assemble due to high repeat content, gene family expansions, segmental and tandem duplications, and polyploidy. Recently, high-throughput mapping and scaffolding strategies have further improved continuity. Together, these long-range technologies enable quality draft assemblies of complex genomes in a cost-effective and timely manner. Here, we present high quality genome assemblies of the model legume plant, Medicago truncatula (R108) using PacBio, Dovetail Chicago (hereafter, Dovetail) and BioNano technologies. To test these technologies for plant genome assembly, we generated five assemblies using all possible combinations and ordering of these three technologies in the R108 assembly. While the BioNano and Dovetail joins overlapped, they also showed complementary gains in continuity and join numbers. Both technologies spanned repetitive regions that PacBio alone was unable to bridge. Combining technologies, particularly Dovetail followed by BioNano, resulted in notable improvements compared to Dovetail or BioNano alone. A combination of PacBio, Dovetail, and BioNano was used to generate a high quality draft assembly of R108, a M. truncatula accession widely used in studies of functional genomics. As a test for the usefulness of the resulting genome sequence, the new R108 assembly was used to pinpoint breakpoints and characterize flanking sequence of a previously identified translocation between chromosomes 4 and 8, identifying more than 22.7 Mb of novel sequence not present in the earlier A17 reference assembly. Adding Dovetail followed by BioNano data yielded complementary improvements in continuity over the original PacBio assembly. This strategy proved efficient and cost-effective for developing a quality draft assembly compared to traditional reference assemblies.

  8. Evaluation of Cathode Heater Assembly for 42 GHz, 200 kW Gyrotron

    NASA Astrophysics Data System (ADS)

    Sharma, S. K.; Singh, Narendra Kumar; Singh, Udaybir; Khatun, Hasina; Kumar, Nitin; Alaria, M. K.; Raju, R. S.; Jain, P. K.; Sinha, A. K.

    2014-09-01

    In this paper, the evaluation of cathode-heater assembly of magnetron injection gun (MIG) for 42 GHz, 200 kW gyrotron is presented. The cathode-heater assembly is purchased from M/S SEMICON.The cathode-heater assembly is experimentally studied in three different conditions; in a belljar system, during vacuum processing of MIG and during MIG testing to ensure the required rise of cathode surface temperature for pre-set heater power.

  9. Thermal performance characterization of residential wall systems using a calibrated hot box with airflow induced by differential pressures

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jones, D.C.; Ober, D.G.; Goodrow, J.T.

    1995-09-01

    ASTM E 283 ad ASTM E 1424 in conjunction with ASTM C 976 were used to study the effect of airflow on thermal performance of the wall. A typical residential 2 {times} 4 stud wall was constructed and placed on top of a subfloor, making a 2.44 {times} 2.74 m (8 by 9 ft) test specimen. This base wall assembly was then covered with two types of XPS sheathing, various housewraps, a 15{number_sign} felt, and a polyethylene vapor retarder film in 40 different configurations and tested individually per ASTM E 283 and per ASTM C 976. For 24 of themore » 40 C 976 tests, a differential pressure was induced across the test wall as per and ASTM E 1424. Airflows ranged from undetectable airflow at 0 {center_dot} Pa {Delta}P to 1.63 L/s {center_dot} m{sup 2} for the base wall assembly alone. Difference in airflow resistance performance between the ASTM E 283 and ASTM E 1424 test methods were noted. Thermal testing results incorporating both ASTM C 976 and ASTM E 1424 for tests 1--28 produced apparent thermal conductances (C-values) in the range of 0.40 W/m{sup 2} {center_dot} K for a nondetectable airflow level to 1.81 W/m{sup 2} {center_dot} K for an airflow of 1.53 L/s {center_dot} m{sup 2} for the base wall assembly alone with a 20-Pa {Delta}P. The calculated C-value for this base wall assembly was 0.40 W/m{sup 2} {center_dot} K. Test results reveal that airflow rates as low as 0.2 L/s {center_dot} m{sup 2} could produce a 46% increase in apparent C-value. Similar thermal performance differences were revealed when thicker shiplap XPS sheathing was used. Tests were also conducted using an Air-Tight Drywall configuration showing the effect of wind washing on thermal performance. By sealing the gypsum drywall on the base wall assembly tested, the apparent C-value, when exposed to a 12.5 Pa wind pressure, was found to be equivalent to a base wall assembly configuration which allows 0.15 L/s {center_dot} m{sup 2} airflow to penetrate completely through.« less

  10. Should We Stop Developing Heuristics and Only Rely on Mixed Integer Programming Solvers in Automated Test Assembly? A Rejoinder to van der Linden and Li (2016).

    PubMed

    Chen, Pei-Hua

    2017-05-01

    This rejoinder responds to the commentary by van der Linden and Li entiled "Comment on Three-Element Item Selection Procedures for Multiple Forms Assembly: An Item Matching Approach" on the article "Three-Element Item Selection Procedures for Multiple Forms Assembly: An Item Matching Approach" by Chen. Van der Linden and Li made a strong statement calling for the cessation of test assembly heuristics development, and instead encouraged embracing mixed integer programming (MIP). This article points out the nondeterministic polynomial (NP)-hard nature of MIP problems and how solutions found using heuristics could be useful in an MIP context. Although van der Linden and Li provided several practical examples of test assembly supporting their view, the examples ignore the cases in which a slight change of constraints or item pool data might mean it would not be possible to obtain solutions as quickly as before. The article illustrates the use of heuristic solutions to improve both the performance of MIP solvers and the quality of solutions. Additional responses to the commentary by van der Linden and Li are included.

  11. 75 FR 27409 - Airworthiness Directives; Sikorsky Aircraft Corporation (Sikorsky) Model S-92A Helicopters

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-17

    ... gearbox (MGB) filter bowl assembly with a two-piece MGB filter bowl assembly and replacing the existing mounting studs. The AD also requires inspecting the MGB lube system filters, the housing, the housing... prompted by tests indicating that an existing MGB filter bowl assembly can fail under certain loading...

  12. Adhesives for assembly of lightweight wood containers

    Treesearch

    R. S. Kurtenacker

    1964-01-01

    This report discusses the screening of various adhesive and mastic systems for possible use in assembling lightweight wood containers. Results showed that dynamic tests of simulated box corners correlated reasonably well with rough handling evaluations of eight selected systems when used to assemble lightweight wood boxes made from a Group I container wood....

  13. Dexterity and Bench Assembly Work Productivity in Adults with Mild Mental Retardation.

    ERIC Educational Resources Information Center

    Serr, Russell; And Others

    1994-01-01

    This study compared dexterity scores using the Vocational Transit Test System and bench assembly work productivity in 30 adults with mild mental retardation. Moderately high correlations were found between work output and motor coordination, manual dexterity, finger dexterity (with and without assembly), and total dexterity score. Finger dexterity…

  14. Design and development of a 40 kV pierce electron gun

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bhattacharjee, D.; Tiwari, R.; Jayaprakash, D., E-mail: dhruva.bhattacharjee@gmail.com

    A 40 kV electron gun is designed and developed using the Pierce configuration for the focusing electrode. Simulations were carried out using CST Particle Studio. The Gun is a thermionic type electron gun with indirect heating of the LaB6 cathode. The gun is capable of delivering a beam current of more than 500 mA at 40 kV with a beam size of less than 5 mm. The cathode assembly consists of cups and heat shields made out of Tantalum and Rhenium sheets. The cathode assembly and the electron gun was fabricated, assembled and tested on test bench for cathode conditioning,more » HV conditioning and beam characterization. This paper presents the gun design, particle simulations study, testing of the gun on test bench. (author)« less

  15. Technological development of spectral filters for Sentinel-2

    NASA Astrophysics Data System (ADS)

    Schröter, Karin; Schallenberg, Uwe; Mohaupt, Matthias

    2017-11-01

    In the frame of the initiative for Global Monitoring for Environment and Security (GMES), jointly undertaken by the European Commission and the European Space Agency a technological development of two filter assemblies was performed for the Multi- Spectral Instrument (MSI) for Sentinel-2. The multispectral pushbroom imaging of the Earth will be performed in 10 VNIR bands (from 443 nm to 945nm) and 3 SWIR bands (from 1375 nm to 2190 nm). Possible filter coating techniques and masking concepts were considered in the frame of trade-off studies. The selected deposition concept is based on self-blocked all-dielectric multilayer band pass filter. Band pass and blocking characteristic is deposited on the space side of a single filter substrate whereas the detector side of the substrate has an antireflective coating. The space- and detector side masking design is realized by blades integrated in the mechanical parts including the mechanical interface to the filter assembly support on the MSI focal plane. The feasibility and required performance of the VNIR Filter Assembly and SWIR Filter Assembly were successfully demonstrated by breadboarding. Extensive performance tests of spectral and optical parameters and environmental tests (radiation, vibration, shock, thermal vacuum cycling, humidity) were performed on filter stripe- and filter assembly level. The presentation will contain a detailed description of the filter assembly design and the results of the performance and environmental tests.

  16. Assembly, Integration, and Test Methods for Operationally Responsive Space Satellites

    DTIC Science & Technology

    2010-03-01

    like assembly and vibration tests, to ensure there have been no failures induced by the activities. External thermal control blankets and radiator...configuration of the satellite post- vibration test and adds time to the process. • Thermal blanketing is not realistic with current technology or...patterns for thermal blankets and radiator tape. The computer aided drawing (CAD) solid model was used to generate patterns that were cut and applied real

  17. Design verification test matrix development for the STME thrust chamber assembly

    NASA Technical Reports Server (NTRS)

    Dexter, Carol E.; Elam, Sandra K.; Sparks, David L.

    1993-01-01

    This report presents the results of the test matrix development for design verification at the component level for the National Launch System (NLS) space transportation main engine (STME) thrust chamber assembly (TCA) components including the following: injector, combustion chamber, and nozzle. A systematic approach was used in the development of the minimum recommended TCA matrix resulting in a minimum number of hardware units and a minimum number of hot fire tests.

  18. Interim status report on lead-cooled fast reactor (LFR) research and development.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tzanos, C. P.; Sienicki, J. J.; Moisseytsev, A.

    2008-03-31

    This report discusses the status of Lead-Cooled Fast Reactor (LFR) research and development carried out during the first half of FY 2008 under the U.S. Department of Energy Generation IV Nuclear Energy Systems Initiative. Lead-Cooled Fast Reactor research and development has recently been transferred from Generation IV to the Reactor Campaign of the Global Nuclear Energy Partnership (GNEP). Another status report shall be issued at the end of FY 2008 covering all of the LFR activities carried out in FY 2008 for both Generation IV and GNEP. The focus of research and development in FY 2008 is an initial investigationmore » of a concept for a LFR Advanced Recycling Reactor (ARR) Technology Pilot Plant (TPP)/demonstration test reactor (demo) incorporating features and operating conditions of the European Lead-cooled SYstem (ELSY) {approx} 600 MWe lead (Pb)-cooled LFR preconceptual design for the transmutation of waste and central station power generation, and which would enable irradiation testing of advanced fuels and structural materials. Initial scoping core concept development analyses have been carried out for a 100 MWt core composed of sixteen open-lattice 20 by 20 fuel assemblies largely similar to those of the ELSY preconceptual fuel assembly design incorporating fuel pins with mixed oxide (MOX) fuel, central control rods in each fuel assembly, and cooled with Pb coolant. For a cycle length of three years, the core is calculated to have a conversion ratio of 0.79, an average discharge burnup of 108 MWd/kg of heavy metal, and a burnup reactivity swing of about 13 dollars. With a control rod in each fuel assembly, the reactivity worth of an individual rod would need to be significantly greater than one dollar which is undesirable for postulated rod withdrawal reactivity insertion events. A peak neutron fast flux of 2.0 x 10{sup 15} (n/cm{sup 2}-s) is calculated. For comparison, the 400 MWt Fast Flux Test Facility (FFTF) achieved a peak neutron fast flux of 7.2 x 10{sup 15} (n/cm{sup 2}-s) and the initially 563 MWt PHENIX reactor attained 2.0 x 10{sup 15} (n/cm{sup 2}-s) before one of three intermediate cooling loops was shut down due to concerns about potential steam generator tube failures. The calculations do not assume a test assembly location for advanced fuels and materials irradiation in place of a fuel assembly (e.g., at the center of the core); the calculations have not examined whether it would be feasible to replace the central assembly by a test assembly location. However, having only fifteen driver assemblies implies a significant effect due to perturbations introduced by the test assembly. The peak neutron fast flux is low compared with the fast fluxes previously achieved in FFTF and PHENIX. Furthermore, the peak neutron fluence is only about half of the limiting value (4 x 10{sup 23} n/cm{sup 2}) typically used for ferritic steels. The results thus suggest that a larger power level (e.g., 400 MWt) and a larger core would be better for a TPP based upon the ELSY fuel assembly design and which can also perform irradiation testing of advanced fuels and materials. In particular, a core having a higher power level and larger dimensions would achieve a suitable average discharge burnup, peak fast flux, peak fluence, and would support the inclusion of one or more test assembly locations. Participation in the Generation IV International Forum Provisional System Steering Committee for the LFR is being maintained throughout FY 2008. Results from the analysis of samples previously exposed to flowing lead-bismuth eutectic (LBE) in the DELTA loop are summarized and a model for the oxidation/corrosion kinetics of steels in heavy liquid metal coolants was applied to systematically compare the calculated long-term (i.e., following several years of growth) oxide layer thicknesses of several steels.« less

  19. [Study of physicochemical and bacteriological impact of a weekly assembly of automated compounding BAXA(®) Exacta-Mix 2400 on parenteral nutrition admixture manufacturing].

    PubMed

    Chappuy, L; Charroin, C; Vételé, F; Durand, T; Quessada, T; Klotz, M-C; Bréant, V; Aulagner, G

    2014-01-01

    The parenteral nutrition admixtures are manufactured with an automated compounding BAXA(®) Exacta-Mix 2400. A 48-hour assembly has been validated. To optimize time and cost, a weekly assembly was tested. Assembly was made on the first day. Ten identical parenteral nutrition admixtures (different volumes and compositions) were produced each day. A macroscopic examination was done at D0, D7 and D14. Physicochemical controls (electrolytes determinations by atomic absorption spectrophotometry, osmolalities measurements) were performed. Microbiological tests included a filtration membrane sterility test (Steritest(®)) and a plate count agar environmental monitoring. All mixtures were considered stable. The 12 Steritest(®) (H24, H48, D7 and D14) did not show any bacterial or fungal contamination. No microorganism has been detected on the plate count agar at D4 and D7. Concerning the physicochemical parameters of each parental nutrition admixture, no significant difference (Wilcoxon test) with the first day was found. The automated filling system BAXA(®) Exacta-Mix 2400 improves the quality and safety of production. According to these results, the weekly assembly is validated and permit to save time (80hours/year) and cost (40 000 euros on consumable/year). Copyright © 2013 Elsevier Masson SAS. All rights reserved.

  20. JPLEX: Java Simplex Implementation with Branch-and-Bound Search for Automated Test Assembly

    ERIC Educational Resources Information Center

    Park, Ryoungsun; Kim, Jiseon; Dodd, Barbara G.; Chung, Hyewon

    2011-01-01

    JPLEX, short for Java simPLEX, is an automated test assembly (ATA) program. It is a mixed integer linear programming (MILP) solver written in Java. It reads in a configuration file, solves the minimization problem, and produces an output file for postprocessing. It implements the simplex algorithm to create a fully relaxed solution and…

  1. Developing Form Assembly Specifications for Exams with Multiple Choice and Constructed Response Items: Balancing Reliability and Validity Concerns

    ERIC Educational Resources Information Center

    Hendrickson, Amy; Patterson, Brian; Ewing, Maureen

    2010-01-01

    The psychometric considerations and challenges associated with including constructed response items on tests are discussed along with how these issues affect the form assembly specifications for mixed-format exams. Reliability and validity, security and fairness, pretesting, content and skills coverage, test length and timing, weights, statistical…

  2. Automated Test Assembly for Cognitive Diagnosis Models Using a Genetic Algorithm

    ERIC Educational Resources Information Center

    Finkelman, Matthew; Kim, Wonsuk; Roussos, Louis A.

    2009-01-01

    Much recent psychometric literature has focused on cognitive diagnosis models (CDMs), a promising class of instruments used to measure the strengths and weaknesses of examinees. This article introduces a genetic algorithm to perform automated test assembly alongside CDMs. The algorithm is flexible in that it can be applied whether the goal is to…

  3. 40 CFR 1048.305 - How must I prepare and test my production-line engines?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... testing procedures specified in subpart F of this part to show you meet the duty-cycle emission standards... way that represents the assembly procedures for other engines in the engine family. You must ask us to approve any deviations from your normal assembly procedures for other production engines in the engine...

  4. 40 CFR 1048.305 - How must I prepare and test my production-line engines?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... testing procedures specified in subpart F of this part to show you meet the duty-cycle emission standards... way that represents the assembly procedures for other engines in the engine family. You must ask us to approve any deviations from your normal assembly procedures for other production engines in the engine...

  5. 40 CFR 1048.305 - How must I prepare and test my production-line engines?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... testing procedures specified in subpart F of this part to show you meet the duty-cycle emission standards... way that represents the assembly procedures for other engines in the engine family. You must ask us to approve any deviations from your normal assembly procedures for other production engines in the engine...

  6. 40 CFR 1048.305 - How must I prepare and test my production-line engines?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... testing procedures specified in subpart F of this part to show you meet the duty-cycle emission standards... way that represents the assembly procedures for other engines in the engine family. You must ask us to approve any deviations from your normal assembly procedures for other production engines in the engine...

  7. 40 CFR 1048.305 - How must I prepare and test my production-line engines?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... testing procedures specified in subpart F of this part to show you meet the duty-cycle emission standards... way that represents the assembly procedures for other engines in the engine family. You must ask us to approve any deviations from your normal assembly procedures for other production engines in the engine...

  8. Profiling System

    NASA Technical Reports Server (NTRS)

    1992-01-01

    A non-destructive testing system, originally developed for Langley Research Center, is sold commercially. The DyLASP Profilometer locates defects in composite and metallic materials and assemblies. It operates in real time and displays results as a contour map of the assembly with defects indicated by size and location. Applications are in non-destructive testing and evaluation, and the company will customize to user requirements.

  9. 25. HISTORIC VIEW OF A2 ROCKET (FULLY ASSEMBLED) EXCEPT FOR ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    25. HISTORIC VIEW OF A-2 ROCKET (FULLY ASSEMBLED) EXCEPT FOR GN2 CONTAINER. AT TEST STAND NO. 1 IN KUMMERSDORF. THE STAND WAS DESIGNED & CONSTRUCTED IN 1932. ROCKET IS BEING TANKED WITH LOX PRECEDING A STATIC FIRING. - Marshall Space Flight Center, Redstone Rocket (Missile) Test Stand, Dodd Road, Huntsville, Madison County, AL

  10. Assembling in Sequence: A Saleable Work Skill. Occupation Simulation Packet. Grades 3rd-4th.

    ERIC Educational Resources Information Center

    Hueston, Jean

    This teacher's guide for grades 3 and 4 contains simulated work experiences for students using the isolated skill concept - assembling in sequence. Teacher instructions include objectives, evaluation, and sequence of activities. The guide contains pre-tests and post-tests with instructions and answer keys. Three pre-skill activities are suggested,…

  11. Engineering analysis and test results of the pre-stage planetary gear trains for wrist rotation and pitch assembly and azimuth and elevation assembly of the extendable stiff arm manipulator kit assembly

    NASA Technical Reports Server (NTRS)

    Morris, R. N.

    1973-01-01

    In order to improve the performance capability of the Extendable Stiff Arm Manipulator (ESAM) it was necessary to increase the overall gear ratio by a factor of approximately four. This is accomplished with minimum effect to existing hardware by the interposition of a planetary gear transmission between the respective drive motors and the harmonic drive transmissions. The engineering analysis in support of this design approach and the subsequent no-load test results are reported.

  12. Evaluation Transportability Testing of the Joint Modular Intermodal Platform (JMIP) Unit #4 TP-94-01, Revision 2, June 2004, Transportability Testing Procedures

    DTIC Science & Technology

    2007-07-01

    Weight: 19,340 lbs 3-1 5. Semitrailer, flatbed , breakbulk/container transporter, 34 ton Model #: M872A1 Manufactured by Heller Truck Body Corporation...REQD). LAMINATE TO BEARING PIECE W/6-10d NAILS EVENLY SPACED. SIDE STRAPPING BOARD ASSEMBLY (4 RECD) EPAGE 5 NOTE: PRODUCE EQUAL QUANTITES OF ASSEMBLY...A AND ASSEMBLY B. EACH JMIP LOAD REQUIRES iWO OF EACH (4 TOTAL). STEEL EDGE PROTECTORS (2 REQD). LAMINATE TO BEARING AND CORNER PIECES W/4-6d NALS AND

  13. Self-aligning hydraulic piston assembly for tensile testing of ceramic

    DOEpatents

    Liu, Kenneth C.

    1987-01-01

    The present invention is directed to a self-aligning grip housing assembly that can transmit an uniaxial load to a tensil specimen without introducing bending stresses into the specimen. Disposed inside said grip housing assembly are a multiplicity of supporting pistons connected to a common source of pressurized oil that carry equal shares of the load applied to the specimen irregardless whether there is initial misalignment between the specimen load column assembly and housing axis.

  14. Self-aligning hydraulic piston assembly for tensile testing of ceramic

    DOEpatents

    Liu, K.C.

    1987-08-18

    The present invention is directed to a self-aligning grip housing assembly that can transmit an uniaxial load to a tensile specimen without introducing bending stresses into the specimen. Disposed inside said grip housing assembly are a multiplicity of supporting pistons connected to a common source of pressurized oil that carry equal shares of the load applied to the specimen regardless whether there is initial misalignment between the specimen load column assembly and housing axis. 4 figs.

  15. Finalizing the DTAG: Implementation and Testing of Design Improvements for Reliability and Availability

    DTIC Science & Technology

    2015-09-30

    acoustics and fine scale motion. The success of the Dtag has resulted in an increased demand for the instrument from researchers both within the...sensor blocks sound when the animal is close to the surface. The polyethylene shell was eliminated in the Dtag-3 design to improve acoustic ...into 3 main sub-assemblies (Figure 5): 1) foam sub-assembly, 2) sensor sub-assembly, and 3) Electronics sub-assembly. This separation enables rapid

  16. Backward assembly planning with DFA analysis

    NASA Technical Reports Server (NTRS)

    Lee, Sukhan (Inventor)

    1992-01-01

    An assembly planning system that operates based on a recursive decomposition of assembly into subassemblies is presented. The planning system analyzes assembly cost in terms of stability, directionality, and manipulability to guide the generation of preferred assembly plans. The planning in this system incorporates the special processes, such as cleaning, testing, labeling, etc., that must occur during the assembly. Additionally, the planning handles nonreversible, as well as reversible, assembly tasks through backward assembly planning. In order to decrease the planning efficiency, the system avoids the analysis of decompositions that do not correspond to feasible assembly tasks. This is achieved by grouping and merging those parts that can not be decomposable at the current stage of backward assembly planning due to the requirement of special processes and the constraint of interconnection feasibility. The invention includes methods of evaluating assembly cost in terms of the number of fixtures (or holding devices) and reorientations required for assembly, through the analysis of stability, directionality, and manipulability. All these factors are used in defining cost and heuristic functions for an AO* search for an optimal plan.

  17. A Neural Assembly-Based View on Word Production: The Bilingual Test Case

    ERIC Educational Resources Information Center

    Strijkers, Kristof

    2016-01-01

    I will propose a tentative framework of how words in two languages could be organized in the cerebral cortex based on neural assembly theory, according to which neurons that fire synchronously are bound into large-scale distributed functional units (assemblies), which represent a mental event as a whole ("gestalt"). For language this…

  18. High speed door assembly

    DOEpatents

    Shapiro, Carolyn

    1993-01-01

    A high speed door assembly, comprising an actuator cylinder and piston rods, a pressure supply cylinder and fittings, an electrically detonated explosive bolt, a honeycomb structured door, a honeycomb structured decelerator, and a structural steel frame encasing the assembly to close over a 3 foot diameter opening within 50 milliseconds of actuation, to contain hazardous materials and vapors within a test fixture.

  19. Kodak Mirror Assembly Tested at Marshall Space Flight Center

    NASA Technical Reports Server (NTRS)

    2003-01-01

    The Eastman-Kodak mirror assembly is being tested for the James Webb Space Telescope (JWST) project at the X-Ray Calibration Facility at Marshall Space Flight Center (MSFC). In this photo, one of many segments of the mirror assembly is being set up inside the 24-ft vacuum chamber where it will undergo x-ray calibration tests. MSFC is supporting Goddard Space Flight Center (GSFC) in developing the JWST by taking numerous measurements to predict its future performance. The tests are conducted in a vacuum chamber cooled to approximate the super cold temperatures found in space. During its 27 years of operation, the facility has performed testing in support of a wide array of projects, including the Hubble Space Telescope (HST), Solar A, Chandra technology development, Chandra High Resolution Mirror Assembly and science instruments, Constellation X-Ray Mission, and Solar X-Ray Imager, currently operating on a Geostationary Operational Environment Satellite. The JWST is NASA's next generation space telescope, a successor to the Hubble Space Telescope, named in honor of NASA's second administrator, James E. Webb. It is scheduled for launch in 2010 aboard an expendable launch vehicle. It will take about 3 months for the spacecraft to reach its destination, an orbit of 940,000 miles in space.

  20. A Gimbal sizing analysis for an IPACS rotating assembly

    NASA Technical Reports Server (NTRS)

    Burke, P. R.; Coronato, P. A.

    1985-01-01

    All major components of an integrated power/attitude control system (IPACS) assembly were analyzed for testing, launch, and operational stresses. The conceptual design for the outer gimbal and mounting ring structures were developed and analyzed along with preliminary designs of the pivot and torquer assemblies. Results from the system response analysis and the thermal analysis are also presented. Gimballing of this rotating assembly should present few difficulties as the maximum gimballing rate is quite low. However, the inner gimbal assembly in its current configuration must be modified to develop the system from a laboratory concept to a realistic flight hardware status.

  1. Functional Metagenomics of Spacecraft Assembly Cleanrooms: Presence of Virulence Factors Associated with Human Pathogens

    PubMed Central

    Bashir, Mina; Ahmed, Mahjabeen; Weinmaier, Thomas; Ciobanu, Doina; Ivanova, Natalia; Pieber, Thomas R.; Vaishampayan, Parag A.

    2016-01-01

    Strict planetary protection practices are implemented during spacecraft assembly to prevent inadvertent transfer of earth microorganisms to other planetary bodies. Therefore, spacecraft are assembled in cleanrooms, which undergo strict cleaning and decontamination procedures to reduce total microbial bioburden. We wanted to evaluate if these practices selectively favor survival and growth of hardy microorganisms, such as pathogens. Three geographically distinct cleanrooms were sampled during the assembly of three NASA spacecraft: The Lockheed Martin Aeronautics' Multiple Testing Facility during DAWN, the Kennedy Space Center's Payload Hazardous Servicing Facility (KSC-PHSF) during Phoenix, and the Jet Propulsion Laboratory's Spacecraft Assembly Facility during Mars Science Laboratory. Sample sets were collected from the KSC-PHSF cleanroom at three time points: before arrival of the Phoenix spacecraft, during the assembly and testing of the Phoenix spacecraft, and after removal of the spacecraft from the KSC-PHSF facility. All samples were subjected to metagenomic shotgun sequencing on an Illumina HiSeq 2500 platform. Strict decontamination procedures had a greater impact on microbial communities than sampling location Samples collected during spacecraft assembly were dominated by Acinetobacter spp. We found pathogens and potential virulence factors, which determine pathogenicity in all the samples tested during this study. Though the relative abundance of pathogens was lowest during the Phoenix assembly, potential virulence factors were higher during assembly compared to before and after assembly, indicating a survival advantage. Decreased phylogenetic and pathogenic diversity indicates that decontamination and preventative measures were effective against the majority of microorganisms and well implemented, however, pathogen abundance still increased over time. Four potential pathogens, Acinetobacter baumannii, Acinetobacter lwoffii, Escherichia coli and Legionella pneumophila, and their corresponding virulence factors were present in all cleanroom samples. This is the first functional metagenomics study describing presence of pathogens and their corresponding virulence factors in cleanroom environments. The results of this study should be considered for microbial monitoring of enclosed environments such as schools, homes, hospitals and more isolated habitation such the International Space Station and future manned missions to Mars. PMID:27667984

  2. Manufacturing and testing VLPC hybrids

    NASA Astrophysics Data System (ADS)

    Adkins, L. R.; Ingram, C. M.; Anderson, E. J.

    1998-11-01

    To insure that the manufacture of VLPC devices is a reliable, cost-effective technology, hybrid assembly procedures and testing methods suitable for large scale production have been developed. This technology has been developed under a contract from Fermilab as part of the D-Zero upgrade program. Each assembled hybrid consists of a VLPC chip mounted on an AlN substrate. The VLPC chip is provided with bonding pads (one connected to each pixel) which are wire bonded to gold traces on the substrate. The VLPC/AlN hybrids are mated in a vacuum sealer using solder preforms and a specially designed carbon boat. After mating, the VLPC pads are bonded to the substrate with an automatic wire bonder. Using this equipment we have achieved a thickness tolerance of ±0.0007 inches and a production rate of 100 parts per hour. After assembly the VLPCs are tested for optical response at an operating temperature of 7K. The parts are tested in a custom designed continuous-flow dewar with a capacity 15 hybrids, and one Lake Shore DT470-SD-11 calibrated temperature sensor mounted to an AlN substrate. Our facility includes five of these dewars with an ultimate test capacity of 75 parts per day. During the course of the Dzero program we have assembled more than 4,000 VLPC hybrids and have tested more than 2,500 with a high yield.

  3. Thermal analysis of the FSP-1 fuel pin irradiation test. [for SP-100 space power reactor

    NASA Technical Reports Server (NTRS)

    Lyon, William F., III

    1991-01-01

    Thermal analysis of a pin from the FSP-1 fuels irradiation test has been completed. The purpose of the analysis was to provide predictions of fuel pin temperatures, determine the flow regime within the lithium annulus of the test assembly, and provide a standardized model for a consistent basis of comparison between pins within the test assembly. The calculations have predicted that the pin is operating at slightly above the test design temperatures and that the flow regime within the lithium annulus is a laminar buoyancy driven flow.

  4. Comparative performance tests on the Mod-2, 2.5-mW wind turbine with and without vortex generators

    NASA Technical Reports Server (NTRS)

    Miller, G. E.

    1995-01-01

    A test program was conducted on the third Mod-2 unit at Goldendale, Washington, to systematically study the effect of vortex generators (VG's) on power performance. The subject unit was first tested without VG's to obtain baseline data. Vortex generators were then installed on the mid-blade assemblies, and the resulting 70% VG configuration was tested. Finally, vortex generators were mounted on the tip assemblies, and data was recorded for the 100% VG configuration. This test program and its results are discussed in this paper. The development of vortex generators is also presented.

  5. Electrical production testing of the D0 Silicon microstrip tracker detector modules

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    D0, SMT Production Testing Group; /Fermilab

    The D0 Silicon Microstrip Tracker (SMT) is the innermost system of the D0 detector in Run 2. It consists of 912 detector units, corresponding to 5 different types of assemblies, which add up to a system with 792,576 readout channels. The task entrusted to the Production Testing group was to thoroughly debug, test and grade each detector module before its installation in the tracker. This note describes the production testing sequence and the procedures by which the detector modules were electrically tested and characterized at the various stages of their assembly.

  6. 30 CFR 7.305 - Critical characteristics.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... APPROVAL OF MINING PRODUCTS TESTING BY APPLICANT OR THIRD PARTY Electric Motor Assemblies § 7.305 Critical characteristics. The following critical characteristics shall be inspected on each motor assembly to which an...

  7. TESS Lens-Bezel Assembly Modal Testing

    NASA Technical Reports Server (NTRS)

    Dilworth, Brandon J.; Karlicek, Alexandra

    2017-01-01

    The Transiting Exoplanet Survey Satellite (TESS) program, led by the Kavli Institute for Astrophysics and Space Research at the Massachusetts Institute of Technology (MIT) will be the first-ever spaceborne all-sky transit survey. MIT Lincoln Laboratory is responsible for the cameras, including the lens assemblies, detector assemblies, lens hoods, and camera mounts. TESS is scheduled to be launched in August of 2017 with the primary goal to detect small planets with bright host starts in the solar neighborhood, so that detailed characterizations of the planets and their atmospheres can be performed. The TESS payload consists of four identical cameras and a data handling unit. Each camera consists of a lens assembly with seven optical elements and a detector assembly with four charge-coupled devices (CCDs) including their associated electronics. The optical prescription requires that several of the lenses are in close proximity to a neighboring element. A finite element model (FEM) was developed to estimate the relative deflections between each lens-bezel assembly under launch loads to predict that there are adequate clearances preventing the lenses from making contact. Modal tests using non-contact response measurements were conducted to experimentally estimate the modal parameters of the lens-bezel assembly, and used to validate the initial FEM assumptions. Key Words Non-contact measurements, modal analysis, model validation

  8. The space station assembly phase: Flight telerobotic servicer feasibility, volume 1

    NASA Technical Reports Server (NTRS)

    Smith, Jeffrey H.; Gyamfi, Max A.; Volkmer, Kent; Zimmerman, Wayne F.

    1987-01-01

    The question is addressed which was raised by the Critical Evaluation Task Force (CETF) analysis of the space station: if a Flight Telerobotic Servicer (FTS) of a given technical risk could be built for use during space station assembly, could it save significant extravehicular (EVA) resources. Key issues and trade-offs associated with using an FTS to aid in space station assembly phase tasks such as construction and servicing are identified. A methodology is presented that incorporates assessment of candidate assembly phase tasks, telerobotics performance capabilities, development costs, operational constraints (STS and proximity operations), maintenance, attached payloads, and polar platforms. A discussion of the issues is presented with focus on potential FTS roles: (1) as a research-oriented test bed to learn more about space usage of telerobotics; (2) as a research-based test bed with an experimental demonstration orientation and limited assembly and servicing applications; or (3) as an operational system to augment EVA, to aid the construction of the space station, and to reduce the programmatic (schedule) risk by increasing the flexibility of mission operations. During the course of the study, the baseline configuration was modified into Phase 1 (a station assembled in 12 flights), and Phase 2 (a station assembled over a 30 flight period) configuration.

  9. Additively Manufactured Main Fuel Valve Housing

    NASA Technical Reports Server (NTRS)

    Eddleman, David; Richard, Jim

    2015-01-01

    Selective Laser Melting (SLM) was utilized to fabricate a liquid hydrogen valve housing typical of those found in rocket engines and main propulsion systems. The SLM process allowed for a valve geometry that would be difficult, if not impossible to fabricate by traditional means. Several valve bodies were built by different SLM suppliers and assembled with valve internals. The assemblies were then tested with liquid nitrogen and operated as desired. One unit was also burst tested and sectioned for materials analysis. The design, test results, and planned testing are presented herein.

  10. Automated Test Assembly Using lp_Solve Version 5.5 in R

    ERIC Educational Resources Information Center

    Diao, Qi; van der Linden, Wim J.

    2011-01-01

    This article reviews the use of the software program lp_solve version 5.5 for solving mixed-integer automated test assembly (ATA) problems. The program is freely available under Lesser General Public License 2 (LGPL2). It can be called from the statistical language R using the lpSolveAPI interface. Three empirical problems are presented to…

  11. J-2X powerpack

    NASA Image and Video Library

    2012-12-13

    The J-2X powerpack assembly was fired up one last time on Dec. 13 at NASA's John C. Stennis Space Center in Mississippi, finishing a year of testing on an important component of America's next heavy-lift rocket. The powerpack assembly burned millions of pounds of propellants during a series of 13 tests during 2012 totaling more than an hour and a half.

  12. Kodak Mirror Assembly Tested at Marshall Space Flight Center

    NASA Technical Reports Server (NTRS)

    2003-01-01

    The Eastman-Kodak mirror assembly is being tested for the James Webb Space Telescope (JWST) project at the X-Ray Calibration Facility at Marshall Space Flight Center (MSFC). In this photo, an MSFC employee is inspecting one of many segments of the mirror assembly for flaws. MSFC is supporting Goddard Space Flight Center (GSFC) in developing the JWST by taking numerous measurements to predict its future performance. The tests are conducted in a vacuum chamber cooled to approximate the super cold temperatures found in space. During its 27 years of operation, the facility has performed testing in support of a wide array of projects, including the Hubble Space Telescope (HST), Solar A, Chandra technology development, Chandra High Resolution Mirror Assembly and science instruments, Constellation X-Ray Mission, and Solar X-Ray Imager, currently operating on a Geostationary Operational Environment Satellite. The JWST is NASA's next generation space telescope, a successor to the Hubble Space Telescope, named in honor of NASA's second administrator, James E. Webb. It is scheduled for launch in 2010 aboard an expendable launch vehicle. It will take about 3 months for the spacecraft to reach its destination, an orbit of 940,000 miles in space.

  13. Characterization testing of MEASAT GaAs/Ge solar cell assemblies

    NASA Technical Reports Server (NTRS)

    Brown, Mike R.; Garcia, Curtis A.; Goodelle, George S.; Powe, Joseph S.; Schwartz, Joel A.

    1996-01-01

    The first commercial communications satellite with gallium-arsenide on germanium (GaAs/Ge) solar arrays is scheduled for launch in December 1995. The spacecraft, named MEASAT, was built by Hughes Space and Communications Company. The solar cell assemblies consisted of large area GaAs/Ge cells supplied by Spectrolab Inc. with infrared reflecting (IRR) coverglass supplied by Pilkington Space Technology. A comprehensive characterization program was performed on the GaAs/Ge solar cell assemblies used on the MEASAT array. This program served two functions; first to establish the database needed to accurately predict on-orbit performance under a variety of conditions; and second, to demonstrate the ability of the solar cell assemblies to withstand all mission environments while still providing the required power at end-of-life. Characterization testing included measurement of electrical performance parameters as a function of radiation exposure, temperature, and angle of incident light; reverse bias stability; optical and thermal properties; mechanical strength tests, panel fabrication, humidity and thermal cycling environmental tests. The results provided a complete database enabling the design of the MEASAT solar array, and demonstrated that the GaAs/Ge cells meet the spacecraft requirements at end-of-life.

  14. Characterization testing of MEASAT GaAs/Ge solar cell assemblies

    NASA Technical Reports Server (NTRS)

    Brown, Mike R.; Garcia, Curtis A.; Goodelle, George S.; Powe, Joseph S.; Schwartz, Joel A.

    1995-01-01

    The first commercial communications satellite with gallium-arsenide on germanium (GaAs/Ge) solar arrays is scheduled for launch in December 1995. The spacecraft, named MEASAT, was built by hughes Space and Telecommunications company for Binariang Satellite Systems of Malaysia. The solar cell assemblies consisted of large area GaAs/Ge cells supplied by Spectrolab Inc. with infrared reflecting (IRR) coverglass supplied by Pilkington Space Technology. A comprehensive characterization program was performed on the GaAs/Ge solar cell assemblies used on the MEASAT array. This program served two functions; first to establish the database needed to accurately predict on-orbit performance under a variety of conditions; and second, to demonstrate the ability of the solar cell assemblies to withstand all mission environments while still providing the required power at end-of-life. characterization testing included measurement of electrical performance parameters as a function of radiation exposure, temperature, and angle of incident light; reverse bias stability; optical and thermal properties; mechanical strength tests, panel fabrication, humidity and thermal cycling environmental tests. The results provided a complete database enabling the design of the MEASAT solar array, and demonstrated that the GaAs/Ge cells meet the spacecraft requirements at end-of-life.

  15. High power s-band vacuum load

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Neubauer, Michael; Dudas, Alan; Krasnykh, Anatoly

    Through a combination of experimentation and calculation the components of a novel room temperature dry load were successfully fabricated. These components included lossy ceramic cylinders of various lengths, thicknesses, and percent of silicon carbide (SiC). The cylinders were then assembled into stainless steel compression rings by differential heating of the parts and a special fixture. Post machining of this assembly provided a means for a final weld. The ring assemblies were then measured for S-parameters, individually and in pairs using a low-cost TE10 rectangular to TE01 circular waveguide adapter specially designed to be part of the final load assembly. Matchedmore » pairs of rings were measured for assembly into the final load, and a sliding short designed and fabricated to assist in determining the desired short location in the final assembly. The plan for the project was for Muons, Inc. to produce prototype loads for long-term testing at SLAC. The STTR funds for SLAC were to upgrade and operate their test station to ensure that the loads would satisfy their requirements. Phase III was to be the sale to SLAC of loads that Muons, Inc. would manufacture. However, an alternate solution that involved a rebuild of the old loads, reduced SLAC budget projections, and a relaxed time for the replacement of all loads meant that in-house labor will be used to do the upgrade without the need for the loads developed in this project. Consequently, the project was terminated before the long term testing was initiated. However, SLAC can use the upgraded test stand to compare the long-term performance of the ones produced in this project with their rebuilt loads when they are available.« less

  16. Performance of the Primary Mirror Center-of-Curvature Optical Metrology System during Cryogenic Testing of the JWST Pathfinder Telescope

    NASA Technical Reports Server (NTRS)

    Hadaway, James B.; Wells, Conrad; Olczak, Gene; Waldman, Mark; Whitman, Tony; Cosentino, Joseph; Connolly, Mark; Chaney, David; Telfer, Randal

    2016-01-01

    The JWST primary mirror consists of 18 1.5 m hexagonal segments, each with 6-DoF and RoC adjustment. The telescope will be tested at its cryogenic operating temperature at Johnson Space Center. The testing will include center-of-curvature measurements of the PM, using the Center-of-Curvature Optical Assembly (COCOA) and the Absolute Distance Meter Assembly (ADMA). The performance of these metrology systems, including hardware, software, procedures, was assessed during two cryogenic tests at JSC, using the JWST Pathfinder telescope. This paper describes the test setup, the testing performed, and the resulting metrology system performance.

  17. Rail-Cask Tests: Normal-Conditionsof- Transport Tests of Surrogate PWR Fuel Assemblies in an ENSA ENUN 32P Cask.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McConnell, Paul E.; Ross, Steven; Grey, Carissa Ann

    This report describes tests conducted using a full-size rail cask, the ENSA ENUN 32P, involving handling of the cask and transport of the cask via truck, ships, and rail. The purpose of the tests was to measure strains and accelerations on surrogate pressurized water reactor fuel rods when the fuel assemblies were subjected to Normal Conditions of Transport within the rail cask. In addition, accelerations were measured on the transport platform, the cask cradle, the cask, and the basket within the cask holding the assemblies. These tests were an international collaboration that included Equipos Nucleares S.A., Sandia National Laboratories, Pacificmore » Northwest National Laboratory, Coordinadora Internacional de Cargas S.A., the Transportation Technology Center, Inc., the Korea Radioactive Waste Agency, and the Korea Atomic Energy Research Institute. All test results in this report are PRELIMINARY – complete analyses of test data will be completed and reported in FY18. However, preliminarily: The strains were exceedingly low on the surrogate fuel rods during the rail-cask tests for all the transport and handling modes. The test results provide a compelling technical basis for the safe transport of spent fuel.« less

  18. An Evaluation of Different Statistical Targets for Assembling Parallel Forms in Item Response Theory

    PubMed Central

    Ali, Usama S.; van Rijn, Peter W.

    2015-01-01

    Assembly of parallel forms is an important step in the test development process. Therefore, choosing a suitable theoretical framework to generate well-defined test specifications is critical. The performance of different statistical targets of test specifications using the test characteristic curve (TCC) and the test information function (TIF) was investigated. Test length, the number of test forms, and content specifications are considered as well. The TCC target results in forms that are parallel in difficulty, but not necessarily in terms of precision. Vice versa, test forms created using a TIF target are parallel in terms of precision, but not necessarily in terms of difficulty. As sometimes the focus is either on TIF or TCC, differences in either difficulty or precision can arise. Differences in difficulty can be mitigated by equating, but differences in precision cannot. In a series of simulations using a real item bank, the two-parameter logistic model, and mixed integer linear programming for automated test assembly, these differences were found to be quite substantial. When both TIF and TCC are combined into one target with manipulation to relative importance, these differences can be made to disappear.

  19. Analytical Verifications in Cryogenic Testing of NGST Advanced Mirror System Demonstrators

    NASA Technical Reports Server (NTRS)

    Cummings, Ramona; Levine, Marie; VanBuren, Dave; Kegley, Jeff; Green, Joseph; Hadaway, James; Presson, Joan; Cline, Todd; Stahl, H. Philip (Technical Monitor)

    2002-01-01

    Ground based testing is a critical and costly part of component, assembly, and system verifications of large space telescopes. At such tests, however, with integral teamwork by planners, analysts, and test personnel, segments can be included to validate specific analytical parameters and algorithms at relatively low additional cost. This paper opens with strategy of analytical verification segments added to vacuum cryogenic testing of Advanced Mirror System Demonstrator (AMSD) assemblies. These AMSD assemblies incorporate material and architecture concepts being considered in the Next Generation Space Telescope (NGST) design. The test segments for workmanship testing, cold survivability, and cold operation optical throughput are supplemented by segments for analytical verifications of specific structural, thermal, and optical parameters. Utilizing integrated modeling and separate materials testing, the paper continues with support plan for analyses, data, and observation requirements during the AMSD testing, currently slated for late calendar year 2002 to mid calendar year 2003. The paper includes anomaly resolution as gleaned by authors from similar analytical verification support of a previous large space telescope, then closes with draft of plans for parameter extrapolations, to form a well-verified portion of the integrated modeling being done for NGST performance predictions.

  20. 30 CFR 7.41 - Purpose and effective date.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... APPROVAL OF MINING PRODUCTS TESTING BY APPLICANT OR THIRD PARTY Battery Assemblies § 7.41 Purpose and effective date. This subpart establishes the specific requirements for MSHA approval of battery assemblies...

  1. 30 CFR 7.41 - Purpose and effective date.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... APPROVAL OF MINING PRODUCTS TESTING BY APPLICANT OR THIRD PARTY Battery Assemblies § 7.41 Purpose and effective date. This subpart establishes the specific requirements for MSHA approval of battery assemblies...

  2. 30 CFR 7.41 - Purpose and effective date.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... APPROVAL OF MINING PRODUCTS TESTING BY APPLICANT OR THIRD PARTY Battery Assemblies § 7.41 Purpose and effective date. This subpart establishes the specific requirements for MSHA approval of battery assemblies...

  3. NASA AMES infrared detector assemblies

    NASA Technical Reports Server (NTRS)

    1979-01-01

    Silicon: Gallium infrared detector assemblies were designed, fabricated, and tested using techniques representative of those employed for hybrid arrays to determine the suitability of this candidate technology for infrared astronomical detector array applications. Both the single channel assembly and the assembly using a 32 channel CMOS multiplexer are considered. The detector material was certified to have a boron background of less than 10 to the 13th power atoms/sq cm counter doped with phosphorus. The gallium concentration is 2 x 10 to the 16th power atoms/cu cm.

  4. Compressed air demand-type firefighter's breathing system, volume 1. [design analysis and performance tests

    NASA Technical Reports Server (NTRS)

    Sullivan, J. L.

    1975-01-01

    The commercial availability of lightweight high pressure compressed air vessels has resulted in a lightweight firefighter's breathing apparatus. The improved apparatus, and details of its design and development are described. The apparatus includes a compact harness assembly, a backplate mounted pressure reducer assembly, a lightweight bubble-type facemask with a mask mounted demand breathing regulator. Incorporated in the breathing regulator is exhalation valve, a purge valve and a whistle-type low pressure warning that sounds only during inhalation. The pressure reducer assembly includes two pressure reducers, an automatic transfer valve and a signaling device for the low pressure warning. Twenty systems were fabricated, tested, refined through an alternating development and test sequence, and extensively examined in a field evaluation program. Photographs of the apparatus are included.

  5. High-pressure LOX/hydrocarbon preburners and gas generators

    NASA Technical Reports Server (NTRS)

    Huebner, A. W.

    1981-01-01

    The objective of the program was to conduct a small scale hardware test program to establish the technology base required for LOX/hydrocarbon preburners and gas generators. The program consisted of six major tasks; Task I reviewed and assessed the performance prediction models and defined a subscale test program. Task II designed and fabricated this subscale hardware. Task III tested and analyzed the data from this hardware. Task IV analyzed the hot fire results and formulated a preliminary design for 40K preburner assemblies. Task V took the preliminary design and detailed and fabricated three 40K size preburner assemblies, one each fuel-rich LOX/CH, and LOX/RP-1 and one oxidizer rich LOX/CH4. Task VI delivered these preburner assemblies to MSFC for subsequent evaluation.

  6. OSIRIS-REx Visible And Infrared Spectrometer - OVIRS

    NASA Technical Reports Server (NTRS)

    Hair, Jason

    2016-01-01

    Goddard Space Flight Center: Overall Instrument Responsibility; Instrument Scientist and Deputy Instrument Scientist; Management Systems Engineering; Mechanical Hardware; Harness Assemblies; SIDECAR Assembly Code; OVIRS Integration and Environmental Qualification; OVIRS Performance Testing, Calibration and Characterization.

  7. Batch Scheduling for Hybrid Assembly Differentiation Flow Shop to Minimize Total Actual Flow Time

    NASA Astrophysics Data System (ADS)

    Maulidya, R.; Suprayogi; Wangsaputra, R.; Halim, A. H.

    2018-03-01

    A hybrid assembly differentiation flow shop is a three-stage flow shop consisting of Machining, Assembly and Differentiation Stages and producing different types of products. In the machining stage, parts are processed in batches on different (unrelated) machines. In the assembly stage, each part of the different parts is assembled into an assembly product. Finally, the assembled products will further be processed into different types of final products in the differentiation stage. In this paper, we develop a batch scheduling model for a hybrid assembly differentiation flow shop to minimize the total actual flow time defined as the total times part spent in the shop floor from the arrival times until its due date. We also proposed a heuristic algorithm for solving the problems. The proposed algorithm is tested using a set of hypothetic data. The solution shows that the algorithm can solve the problems effectively.

  8. Infrared detectors and test technology of cryogenic camera

    NASA Astrophysics Data System (ADS)

    Yang, Xiaole; Liu, Xingxin; Xing, Mailing; Ling, Long

    2016-10-01

    Cryogenic camera which is widely used in deep space detection cools down optical system and support structure by cryogenic refrigeration technology, thereby improving the sensitivity. Discussing the characteristics and design points of infrared detector combined with camera's characteristics. At the same time, cryogenic background test systems of chip and detector assembly are established. Chip test system is based on variable cryogenic and multilayer Dewar, and assembly test system is based on target and background simulator in the thermal vacuum environment. The core of test is to establish cryogenic background. Non-uniformity, ratio of dead pixels and noise of test result are given finally. The establishment of test system supports for the design and calculation of infrared systems.

  9. It's All a Matter of Perspective: Viewing First-Person Video Modeling Examples Promotes Learning of an Assembly Task

    ERIC Educational Resources Information Center

    Fiorella, Logan; van Gog, Tamara; Hoogerheide, Vincent; Mayer, Richard E.

    2017-01-01

    The present study tests whether presenting video modeling examples from the learner's (first-person) perspective promotes learning of an assembly task, compared to presenting video examples from a third-person perspective. Across 2 experiments conducted in different labs, university students viewed a video showing how to assemble an 8-component…

  10. How to Organize a Community Assembly Based on a New England Town Meeting Format: A Technique for Determining Community Priorities.

    ERIC Educational Resources Information Center

    Bolton Inst., Inc., Wellesley, MA.

    This model, developed and tested in Vermont, involved a two-day assembly using a technique concentrating on small-group dynamics to encourage productive community assessment and decision-making. Included are exhaustive documentation of an example assembly to consider options for integrating human and environmental requirements in Vermont as a…

  11. High speed door assembly

    DOEpatents

    Shapiro, C.

    1993-04-27

    A high speed door assembly is described, comprising an actuator cylinder and piston rods, a pressure supply cylinder and fittings, an electrically detonated explosive bolt, a honeycomb structured door, a honeycomb structured decelerator, and a structural steel frame encasing the assembly to close over a 3 foot diameter opening within 50 milliseconds of actuation, to contain hazardous materials and vapors within a test fixture.

  12. 49 CFR 571.203 - Standard No. 203; Impact protection for the driver from the steering control system.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Practice J944, “Steering Wheel Assembly Laboratory Test Procedure,” December 1965, or an approved.... 208 (49 CFR 571.208) by means of other than seat belt assemblies. It also does not apply to walk-in... trim hardware, including any portion of a steering column assembly that provides energy absorption upon...

  13. 49 CFR 571.203 - Standard No. 203; Impact protection for the driver from the steering control system.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Practice J944, “Steering Wheel Assembly Laboratory Test Procedure,” December 1965, or an approved.... 208 (49 CFR 571.208) by means of other than seat belt assemblies. It also does not apply to walk-in... trim hardware, including any portion of a steering column assembly that provides energy absorption upon...

  14. Detailed Analysis and Design Review of the MARK IX (Modified) Underwater Breathing Apparatus

    DTIC Science & Technology

    1969-07-30

    hard- chrome plated, and the purge-valve assembly and regulator piston . electroless-nickel plated. Manufacturing/Assembly Controls and Tests The control...high a flow through the orifice, peak pressures of 4500 psi have been applied repeatedly with- out failure or damage to any component. (7) Orifice...c) Proved In use. (d) "Functional" test by stpplkir. (5)J (e) Peak pressure of only 4500 jsi reached. (1) (f) Leak test at 1-1/2 •is. (g) Predive

  15. Self-aligning biaxial load frame

    DOEpatents

    Ward, M.B.; Epstein, J.S.; Lloyd, W.R.

    1994-01-18

    An self-aligning biaxial loading apparatus for use in testing the strength of specimens while maintaining a constant specimen centroid during the loading operation. The self-aligning biaxial loading apparatus consists of a load frame and two load assemblies for imparting two independent perpendicular forces upon a test specimen. The constant test specimen centroid is maintained by providing elements for linear motion of the load frame relative to a fixed cross head, and by alignment and linear motion elements of one load assembly relative to the load frame. 3 figures.

  16. Self-aligning biaxial load frame

    DOEpatents

    Ward, Michael B.; Epstein, Jonathan S.; Lloyd, W. Randolph

    1994-01-01

    An self-aligning biaxial loading apparatus for use in testing the strength of specimens while maintaining a constant specimen centroid during the loading operation. The self-aligning biaxial loading apparatus consists of a load frame and two load assemblies for imparting two independent perpendicular forces upon a test specimen. The constant test specimen centroid is maintained by providing elements for linear motion of the load frame relative to a fixed crosshead, and by alignment and linear motion elements of one load assembly relative to the load frame.

  17. Reliability of CGA/LGA/HDI Package Board/Assembly (Final Report)

    NASA Technical Reports Server (NTRS)

    Ghaffaroam. Reza

    2014-01-01

    Package manufacturers are now offering commercial-off-the-shelf column grid array (COTS CGA) packaging technologies in high-reliability versions. Understanding the process and quality assurance (QA) indicators for reliability are important for low-risk insertion of these advanced electronics packages. The previous reports, released in January of 2012 and January of 2013, presented package test data, assembly information, and reliability evaluation by thermal cycling for CGA packages with 1752, 1517, 1509, and 1272 inputs/outputs (I/Os) and 1-mm pitch. It presented the thermal cycling (-55C either 100C or 125C) test results for up to 200 cycles. This report presents up to 500 thermal cycles with quality assurance and failure analysis evaluation represented by optical photomicrographs, 2D real time X-ray images, dye-and-pry photomicrographs, and optical/scanning electron Microscopy (SEM) cross-sectional images. The report also presents assembly challenge using reflowing by either vapor phase or rework station of CGA and land grid array (LGA) versions of three high I/O packages both ceramic and plastic configuration. A new test vehicle was designed having high density interconnect (HDI) printed circuit board (PCB) with microvia-in-pad to accommodate both LGA packages as well as a large number of fine pitch ball grid arrays (BGAs). The LGAs either were assembled onto HDI PCB as an LGA or were solder paste print and reflow first to form solder dome on pads before assembly. Both plastic BGAs with 1156 I/O and ceramic LGAs were assembled. It also presented the X-ray inspection results as well as failures due to 200 thermal cycles. Lessons learned on assembly of ceramic LGAs are also presented.

  18. Design fabrication and nondestructive testing of six experimental AGCarb/Intermold 3 cylinder assemblies

    NASA Technical Reports Server (NTRS)

    Thacher, E. F.

    1972-01-01

    Six subscale Intermold cylinder assemblies with a total of twelve different concepts for transition to AGCarb were fabricated. Three of the cylinder assemblies were made by helically winding the hoop fibers and three were of orthogonal configuration. The fabrication process is summarized and details of each manufacturing method are given. The objectives of the test program were to: (1) demonstrate the fabricability of the Intermold 3 subscale flanges, (2) produce an integral transition from Intermold 3 to AGCarb material, (3) define a workable manufacturing process, and (4) identify a best suited inspection method. The objectives were met and the results are described.

  19. Structural assembly demonstration experiment, phase 1

    NASA Astrophysics Data System (ADS)

    Akin, David L.; Bowden, Mary L.; Miller, Rene H.

    1983-03-01

    The goal of this phase of the structural assembly and demonstration experiment (SADE) program was to begin to define a shuttle flight experiment that would yield data to compare on-orbit assembly operations of large space structures with neutral buoyancy simulations. In addition, the experiment would be an early demonstration of structural hardware and human capabilities in extravehicular activity (EVA). The objectives of the MIT study, as listed in the statement of work, were: to provide support in establishing a baseline neutral buoyancy testing data base, to develop a correlation technique between neutral buoyancy test results and on-orbit operations, and to prepare the SADE experiment plan (MSFC-PLAN-913).

  20. Wide-Field InfraRed Survey Telescope (WFIRST) Slitless Spectrometer: Design, Prototype, and Results

    NASA Technical Reports Server (NTRS)

    Gong, Qian; Content, David; Dominguez, Margaret; Emmett, Thomas; Griesmann, Ulf; Hagopian, John; Kruk, Jeffrey; Marx, Catherine; Pasquale, Bert; Wallace, Thomas; hide

    2016-01-01

    The slitless spectrometer plays an important role in the Wide-Field InfraRed Survey Telescope (WFIRST) mission for the survey of emission-line galaxies. This will be an unprecedented very wide field, HST quality 3D survey of emission line galaxies. The concept of the compound grism as a slitless spectrometer has been presented previously. The presentation briefly discusses the challenges and solutions of the optical design, and recent specification updates, as well as a brief comparison between the prototype and the latest design. However, the emphasis of this paper is the progress of the grism prototype: the fabrication and test of the complicated diffractive optical elements and powered prism, as well as grism assembly alignment and testing. Especially how to use different tools and methods, such as IR phase shift and wavelength shift interferometry, to complete the element and assembly tests. The paper also presents very encouraging results from recent element tests to assembly tests. Finally we briefly touch the path forward plan to test the spectral characteristic, such as spectral resolution and response.

  1. The center of curvature optical assembly for the JWST primary mirror cryogenic optical test: optical verification

    NASA Astrophysics Data System (ADS)

    Wells, Conrad; Olczak, Gene; Merle, Cormic; Dey, Tom; Waldman, Mark; Whitman, Tony; Wick, Eric; Peer, Aaron

    2010-08-01

    The James Webb Space Telescope (JWST) Optical Telescope Element (OTE) consists of a 6.6 m clear aperture, allreflective, three-mirror anastigmat. The 18-segment primary mirror (PM) presents unique and challenging assembly, integration, alignment and testing requirements. A full aperture center of curvature optical test is performed in cryogenic vacuum conditions at the integrated observatory level to verify PM performance requirements. The Center of Curvature Optical Assembly (CoCOA), designed and being built by ITT satisfies the requirements for this test. The CoCOA contains a multi wave interferometer, patented reflective null lens, actuation for alignment, full in situ calibration capability, coarse and fine alignment sensing systems, as well as a system for monitoring changes in the PM to CoCOA distance. Two wave front calibration tests are utilized to verify the low and Mid/High spatial frequencies, overcoming the limitations of the standard null/hologram configuration in its ability to resolve mid and high spatial frequencies. This paper will introduce the systems level architecture and optical test layout for the CoCOA.

  2. ETR COMPRESSOR BUILDING, TRA643. CAMERA FACES NORTHEAST. WATER HEAT EXCHANGER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    ETR COMPRESSOR BUILDING, TRA-643. CAMERA FACES NORTHEAST. WATER HEAT EXCHANGER IS IN LEFT FOREGROUND. A PARTIALLY ASSEMBLED PLANT AIR CONDITIONER IS AT CENTER. WORKERS AT RIGHT ASSEMBLE 4000 HORSEPOWER COMPRESSOR DRIVE MOTOR AT RIGHT. INL NEGATIVE NO. 56-3714. R.G. Larsen, Photographer, 11/13/1956 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID

  3. Item Selection for the Development of Parallel Forms from an IRT-Based Seed Test Using a Sampling and Classification Approach

    ERIC Educational Resources Information Center

    Chen, Pei-Hua; Chang, Hua-Hua; Wu, Haiyan

    2012-01-01

    Two sampling-and-classification-based procedures were developed for automated test assembly: the Cell Only and the Cell and Cube methods. A simulation study based on a 540-item bank was conducted to compare the performance of the procedures with the performance of a mixed-integer programming (MIP) method for assembling multiple parallel test…

  4. Comparison of Integer Programming (IP) Solvers for Automated Test Assembly (ATA). Research Report. ETS RR-15-05

    ERIC Educational Resources Information Center

    Donoghue, John R.

    2015-01-01

    At the heart of van der Linden's approach to automated test assembly (ATA) is a linear programming/integer programming (LP/IP) problem. A variety of IP solvers are available, ranging in cost from free to hundreds of thousands of dollars. In this paper, I compare several approaches to solving the underlying IP problem. These approaches range from…

  5. Push plate, mounting assembly, circuit board, and method of assembling thereof for ball grid array packages

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vaughn, Mark R.; Montague, Stephen

    A push plate that includes springs in the form of cantilever flexures and an inspection window is disclosed. The push plate provides a known, uniform, down force and minimal torque to a package to be tested. The cantilevers have a known, calculable down force producing stiffness. The window provides for viewing of the package during testing.

  6. Minimus: a fast, lightweight genome assembler.

    PubMed

    Sommer, Daniel D; Delcher, Arthur L; Salzberg, Steven L; Pop, Mihai

    2007-02-26

    Genome assemblers have grown very large and complex in response to the need for algorithms to handle the challenges of large whole-genome sequencing projects. Many of the most common uses of assemblers, however, are best served by a simpler type of assembler that requires fewer software components, uses less memory, and is far easier to install and run. We have developed the Minimus assembler to address these issues, and tested it on a range of assembly problems. We show that Minimus performs well on several small assembly tasks, including the assembly of viral genomes, individual genes, and BAC clones. In addition, we evaluate Minimus' performance in assembling bacterial genomes in order to assess its suitability as a component of a larger assembly pipeline. We show that, unlike other software currently used for these tasks, Minimus produces significantly fewer assembly errors, at the cost of generating a more fragmented assembly. We find that for small genomes and other small assembly tasks, Minimus is faster and far more flexible than existing tools. Due to its small size and modular design Minimus is perfectly suited to be a component of complex assembly pipelines. Minimus is released as an open-source software project and the code is available as part of the AMOS project at Sourceforge.

  7. Shuttle S-band high gain switched beam breadboard antennas

    NASA Technical Reports Server (NTRS)

    Mullaney, J. J.

    1985-01-01

    The final fabrication and assembly of the S-band five-element, eight-beam breadboard antennas developed for the Space Shuttle program are described. Data summary sheets from component and final assembly testing are presented.

  8. STS-71 hardware assembly view

    NASA Technical Reports Server (NTRS)

    1994-01-01

    Lockheed Space Operations Company workers in the Extended Duration Orbiter (EDO) Facility, located inside the Vehicle Assembly Building (VAB), carefully hoist the Orbiter Docking System (ODS) from its shipping container into a test stand. The ODS was ship

  9. The versatility of a truss mounted mobile transporter for in-space construction

    NASA Technical Reports Server (NTRS)

    Bush, Harold G.; Lake, Mark S.; Watson, Judith J.; Heard, Walter L., Jr.

    1988-01-01

    The Mobile Transporter (MT) evolution from early erectable structures assembly activities is detailed. The MT operational features which are required to support astronauts performing on-orbit structure construction or spacecraft assembly functions are presented and discussed. Use of the MT to perform a variety of assembly functions is presented. Estimated EVA assembly times for a precision segmented reflector approximately 20 m in diameter are presented. The EVA/MT technique under study for construction of the reflector (and the entire spacecraft) is illustrated. Finally, the current status of development activities and test results involving the MT and Space Station structural assembly are presented.

  10. Novel Soluble Dietary Fiber-Tannin Self-Assembled Film: A Promising Protein Protective Material.

    PubMed

    Song, Guo-Bin; Xu, Juan; Zheng, Hua; Feng, Ying; Zhang, Wen-Wen; Li, Kun; Ge, Shuang-shuang; Li, Kai; Zhang, Hong

    2015-06-24

    In this experiment, a natural promising protein protective film was fabricated through soluble dietary fiber (SDF)-tannin nanocluster self-assembly. FT-IR, XRD, and DSC tests were employed to investigate the interaction between the SDF and tannins before and after cross-linking induced by calcium ion. On the other hand, referring to the SEM and TEM results, the self-assembly process of the protein protective film could be indicated as follows: first, calcium ion, with its cross-ability, served as the "nucleus"; SDF and tannins were combined to prepare the nanoscale SDF-tannin clusters; then, the clusters were homogeneously deposited on the surface of protein to form a protective film by self-assembling hydrogen bond between tannin component of clusters as "adhesive" and protein in aqueous solutions under very mild conditions. Film thickness could also be controlled by tannin of different concentrations ranging from 114 to 1384 μm. Antibacterial test and in vitro cytotoxicity test proved that the film had a broad spectrum of antimicrobial properties and excellent cell biocompatibility, respectively, which might open up new applications in the food preservation and biomedical fields.

  11. Pressure activated interconnection of micro transfer printed components

    NASA Astrophysics Data System (ADS)

    Prevatte, Carl; Guven, Ibrahim; Ghosal, Kanchan; Gomez, David; Moore, Tanya; Bonafede, Salvatore; Raymond, Brook; Trindade, António Jose; Fecioru, Alin; Kneeburg, David; Meitl, Matthew A.; Bower, Christopher A.

    2016-05-01

    Micro transfer printing and other forms of micro assembly deterministically produce heterogeneously integrated systems of miniaturized components on non-native substrates. Most micro assembled systems include electrical interconnections to the miniaturized components, typically accomplished by metal wires formed on the non-native substrate after the assembly operation. An alternative scheme establishing interconnections during the assembly operation is a cost-effective manufacturing method for producing heterogeneous microsystems, and facilitates the repair of integrated microsystems, such as displays, by ex post facto addition of components to correct defects after system-level tests. This letter describes pressure-concentrating conductor structures formed on silicon (1 0 0) wafers to establish connections to preexisting conductive traces on glass and plastic substrates during micro transfer printing with an elastomer stamp. The pressure concentrators penetrate a polymer layer to form the connection, and reflow of the polymer layer bonds the components securely to the target substrate. The experimental yield of series-connected test systems with >1000 electrical connections demonstrates the suitability of the process for manufacturing, and robustness of the test systems against exposure to thermal shock, damp heat, and mechanical flexure shows reliability of the resulting bonds.

  12. CDRA-4EU Testing in Support of ISS

    NASA Technical Reports Server (NTRS)

    Peters, Warren; Stanley, Christine; Knox, Jim

    2016-01-01

    NASA's Marshall Space Flight Center (MSFC) recently conducted tests on two desiccant beds of the four-bed molecular sieve carbon dioxide removal assembly (CDRA) returned from the International Space Station (ISS). MSFC had previously characterized the relationship between CDRA-4EU inlet conditions and the dewpoint at the desiccant bed exit and between the compressor and accumulator that make up the Carbon Dioxide Management Assembly (CDMA). MSFC installed the flight desiccant beds into the existing Exploration Test Chamber (E-chamber) using a suite of instrumentation not available on orbit to investigate the orbital performance of the desiccant beds. Test objectives, facility design and test results are presented.

  13. Ground Test of the Urine Processing Assembly for Accelerations and Transfer Functions

    NASA Technical Reports Server (NTRS)

    Houston, Janice; Almond, Deborah F. (Technical Monitor)

    2001-01-01

    This viewgraph presentation gives an overview of the ground test of the urine processing assembly for accelerations and transfer functions. Details are given on the test setup, test data, data analysis, analytical results, and microgravity assessment. The conclusions of the tests include the following: (1) the single input/multiple output method is useful if the data is acquired by tri-axial accelerometers and inputs can be considered uncorrelated; (2) tying coherence with the matrix yields higher confidence in results; (3) the WRS#2 rack ORUs need to be isolated; (4) and future work includes a plan for characterizing performance of isolation materials.

  14. Evaluation of test equipment for the detection of contamination on electronic circuits

    NASA Astrophysics Data System (ADS)

    Bergendahl, C. G.; Dunn, B. D.

    1984-08-01

    The reproducibility, sensitivity and ease of operation of test equipment for the detection of ionizable contaminants on the surface of printed circuit assemblies were assessed. The characteristics of the test equipment are described. Soldering fluxes were chosen as contaminants and were applied in controlled amounts to printed-circuit board assemblies possessing two different component populations. Results show that the relationship between equipment readings varies with flux type. Each kind of test equipment gives a good measure of board cleanliness, although reservations exist concerning the interpretation of such results. A test method for the analysis of total (organic and inorganic) halides in solder fluxes is presented.

  15. Irradiation Testing Vehicles for Fast Reactors from Open Test Assemblies to Closed Loops

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sienicki, James J.; Grandy, Christopher

    A review of irradiation testing vehicle approaches and designs that have been incorporated into past Sodium-Cooled Fast Reactors (SFRs) or envisioned for incorporation has been carried out. The objective is to understand the essential features of the approaches and designs so that they can inform test vehicle designs for a future U.S. Fast Test Reactor. Fast test reactor designs examined include EBR-II, FFTF, JOYO, BOR-60, PHÉNIX, JHR, and MBIR. Previous designers exhibited great ingenuity in overcoming design and operational challenges especially when the original reactor plant’s mission changed to an irradiation testing mission as in the EBRII reactor plant. Themore » various irradiation testing vehicles can be categorized as: Uninstrumented open assemblies that fit into core locations; Instrumented open test assemblies that fit into special core locations; Self-contained closed loops; and External closed loops. A special emphasis is devoted to closed loops as they are regarded as a very desirable feature of a future U.S. Fast Test Reactor. Closed loops are an important technology for irradiation of fuels and materials in separate controlled environments. The impact of closed loops on the design of fast reactors is also discussed in this report.« less

  16. Sandia National Laboratories, Tonopah Test Range Assembly Building 9B (Building 09-54): Photographs and Written Historical and Descriptive Data

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ullrich, Rebecca A.

    Assembly Building 9B (Building 09-54) is a contributing element to the Sandia National Laboratories (SNL) Tonopah Test Range (TTR) Historic District. The SNL TTR Historic District played a significant role in U.S. Cold War history in the areas of stockpile surveillance and non-nuclear field testing of nuclear weapons designs. The district covers approximately 179,200 acres and illustrates Cold War development testing of nuclear weapons components and systems. This report includes historical information, architectural information, sources of information, project information, maps, blueprints, and photographs.

  17. EMC tests on the RITA Ion Propulsion Assembly for the ARTEMIS satellite

    NASA Astrophysics Data System (ADS)

    Mueller, H.; Kukies, R.; Bassner, H.

    1992-07-01

    Objectives and results of EMC tests performed on the RITA Ion Propulsion Assembly to demonstrate its compatibility with the requirements of ARTEMIS are discussed. The tested configuration included the RIT 10 thruster, neutralizer, RF generator, power supply and control unit, and electrical ground support equipment. Test results show that the RIT 10 thruster fulfils the EMC requirements for radiated emission in the critical frequency ranges (L/S/KU bands). The emitted E- and H-fields are not expected to disturb the satellite electronics, and no special shielding or other measures to protect the antennas are needed.

  18. Dynamic Characterization of an Inflatable Concentrator for Solar Thermal Propulsion

    NASA Technical Reports Server (NTRS)

    Leigh, Larry M.; Tinker, Michael L.; McConnaughey, Paul (Technical Monitor)

    2002-01-01

    Solar-thermal propulsion is a concept for producing thrust sufficient for orbital transfers and requires innovative, lightweight structures. This note presents a description of an inflatable concentrator that consists of a torus, lens simulator, and three tapered struts. Modal testing was discussed for characterization and verification of the solar concentrator assembly. Finite element shell models of the concentrator were developed using a two-step nonlinear approach, and results were compared to test data. Reasonable model-to-test agreement was achieved for the torus, and results for the concentrator assembly were comparable to the test for several modes.

  19. Optimizing and evaluating the reconstruction of Metagenome-assembled microbial genomes.

    PubMed

    Papudeshi, Bhavya; Haggerty, J Matthew; Doane, Michael; Morris, Megan M; Walsh, Kevin; Beattie, Douglas T; Pande, Dnyanada; Zaeri, Parisa; Silva, Genivaldo G Z; Thompson, Fabiano; Edwards, Robert A; Dinsdale, Elizabeth A

    2017-11-28

    Microbiome/host interactions describe characteristics that affect the host's health. Shotgun metagenomics includes sequencing a random subset of the microbiome to analyze its taxonomic and metabolic potential. Reconstruction of DNA fragments into genomes from metagenomes (called metagenome-assembled genomes) assigns unknown fragments to taxa/function and facilitates discovery of novel organisms. Genome reconstruction incorporates sequence assembly and sorting of assembled sequences into bins, characteristic of a genome. However, the microbial community composition, including taxonomic and phylogenetic diversity may influence genome reconstruction. We determine the optimal reconstruction method for four microbiome projects that had variable sequencing platforms (IonTorrent and Illumina), diversity (high or low), and environment (coral reefs and kelp forests), using a set of parameters to select for optimal assembly and binning tools. We tested the effects of the assembly and binning processes on population genome reconstruction using 105 marine metagenomes from 4 projects. Reconstructed genomes were obtained from each project using 3 assemblers (IDBA, MetaVelvet, and SPAdes) and 2 binning tools (GroopM and MetaBat). We assessed the efficiency of assemblers using statistics that including contig continuity and contig chimerism and the effectiveness of binning tools using genome completeness and taxonomic identification. We concluded that SPAdes, assembled more contigs (143,718 ± 124 contigs) of longer length (N50 = 1632 ± 108 bp), and incorporated the most sequences (sequences-assembled = 19.65%). The microbial richness and evenness were maintained across the assembly, suggesting low contig chimeras. SPAdes assembly was responsive to the biological and technological variations within the project, compared with other assemblers. Among binning tools, we conclude that MetaBat produced bins with less variation in GC content (average standard deviation: 1.49), low species richness (4.91 ± 0.66), and higher genome completeness (40.92 ± 1.75) across all projects. MetaBat extracted 115 bins from the 4 projects of which 66 bins were identified as reconstructed metagenome-assembled genomes with sequences belonging to a specific genus. We identified 13 novel genomes, some of which were 100% complete, but show low similarity to genomes within databases. In conclusion, we present a set of biologically relevant parameters for evaluation to select for optimal assembly and binning tools. For the tools we tested, SPAdes assembler and MetaBat binning tools reconstructed quality metagenome-assembled genomes for the four projects. We also conclude that metagenomes from microbial communities that have high coverage of phylogenetically distinct, and low taxonomic diversity results in highest quality metagenome-assembled genomes.

  20. Launch Deployment Assembly Extravehicular Activity Neutral Buoyancy Development Test Report

    NASA Technical Reports Server (NTRS)

    Loughead, T.

    1996-01-01

    This test evaluated the Launch Deployment Assembly (LDA) design for Extravehicular Activity (EVA) work sites (setup, igress, egress), reach and visual access, and translation required for cargo item removal. As part of the LDA design, this document describes the method and results of the LDA EVA Neutral Buoyancy Development Test to ensure that the LDA hardware support the deployment of the cargo items from the pallet. This document includes the test objectives, flight and mockup hardware description, descriptions of procedures and data collection used in the testing, and the results of the development test at the National Aeronautics and Space Administrations (NASA) Marshall Space Flight Center (MSFC) Neutral Buoyancy Simulator (NBS).

  1. Target Assembly to Check Boresight Alignment of Active Sensors

    NASA Technical Reports Server (NTRS)

    Ramos-Izquierdo, Luis; Scott, V. Stanley; Riris, Haris; Cavanaugh, John; Liiva, Peter; Rodriguez, Michael

    2011-01-01

    A compact and portable target assembly (Fig. 1) has been developed to measure the boresite alignment of LRO's Lunar Orbiter Laser Altimeter (LOLA) instrument at the spacecraft level. The concept for this target assembly has evolved over many years with earlier versions used to test the Mars Observer Laser Altimeter (MOLA), the Geoscience Laser Altimeter System (GLAS), and the Mercury Laser Altimeter (MLA) space-based instruments.

  2. Genome Partitioner: A web tool for multi-level partitioning of large-scale DNA constructs for synthetic biology applications.

    PubMed

    Christen, Matthias; Del Medico, Luca; Christen, Heinz; Christen, Beat

    2017-01-01

    Recent advances in lower-cost DNA synthesis techniques have enabled new innovations in the field of synthetic biology. Still, efficient design and higher-order assembly of genome-scale DNA constructs remains a labor-intensive process. Given the complexity, computer assisted design tools that fragment large DNA sequences into fabricable DNA blocks are needed to pave the way towards streamlined assembly of biological systems. Here, we present the Genome Partitioner software implemented as a web-based interface that permits multi-level partitioning of genome-scale DNA designs. Without the need for specialized computing skills, biologists can submit their DNA designs to a fully automated pipeline that generates the optimal retrosynthetic route for higher-order DNA assembly. To test the algorithm, we partitioned a 783 kb Caulobacter crescentus genome design. We validated the partitioning strategy by assembling a 20 kb test segment encompassing a difficult to synthesize DNA sequence. Successful assembly from 1 kb subblocks into the 20 kb segment highlights the effectiveness of the Genome Partitioner for reducing synthesis costs and timelines for higher-order DNA assembly. The Genome Partitioner is broadly applicable to translate DNA designs into ready to order sequences that can be assembled with standardized protocols, thus offering new opportunities to harness the diversity of microbial genomes for synthetic biology applications. The Genome Partitioner web tool can be accessed at https://christenlab.ethz.ch/GenomePartitioner.

  3. Elevational Gradients in β-Diversity Reflect Variation in the Strength of Local Community Assembly Mechanisms across Spatial Scales

    PubMed Central

    Tello, J. Sebastián; Myers, Jonathan A.; Macía, Manuel J.; Fuentes, Alfredo F.; Cayola, Leslie; Arellano, Gabriel; Loza, M. Isabel; Torrez, Vania; Cornejo, Maritza; Miranda, Tatiana B.; Jørgensen, Peter M.

    2015-01-01

    Despite long-standing interest in elevational-diversity gradients, little is known about the processes that cause changes in the compositional variation of communities (β-diversity) across elevations. Recent studies have suggested that β-diversity gradients are driven by variation in species pools, rather than by variation in the strength of local community assembly mechanisms such as dispersal limitation, environmental filtering, or local biotic interactions. However, tests of this hypothesis have been limited to very small spatial scales that limit inferences about how the relative importance of assembly mechanisms may change across spatial scales. Here, we test the hypothesis that scale-dependent community assembly mechanisms shape biogeographic β-diversity gradients using one of the most well-characterized elevational gradients of tropical plant diversity. Using an extensive dataset on woody plant distributions along a 4,000-m elevational gradient in the Bolivian Andes, we compared observed patterns of β-diversity to null-model expectations. β-deviations (standardized differences from null values) were used to measure the relative effects of local community assembly mechanisms after removing sampling effects caused by variation in species pools. To test for scale-dependency, we compared elevational gradients at two contrasting spatial scales that differed in the size of local assemblages and regions by at least an order of magnitude. Elevational gradients in β-diversity persisted after accounting for regional variation in species pools. Moreover, the elevational gradient in β-deviations changed with spatial scale. At small scales, local assembly mechanisms were detectable, but variation in species pools accounted for most of the elevational gradient in β-diversity. At large spatial scales, in contrast, local assembly mechanisms were a dominant force driving changes in β-diversity. In contrast to the hypothesis that variation in species pools alone drives β-diversity gradients, we show that local community assembly mechanisms contribute strongly to systematic changes in β-diversity across elevations. We conclude that scale-dependent variation in community assembly mechanisms underlies these iconic gradients in global biodiversity. PMID:25803846

  4. Fast response pyroelectric detector-preamplifier assembled device

    NASA Astrophysics Data System (ADS)

    Bai, PiJi; Tai, Yunjian; Liu, Huiping

    2008-03-01

    The pyroelectric detector is wide used for its simple structure and high performance to price ratio. It has been used in thermal detecting, infrared spectrum and laser testing. When the pyroelectric detector was applied in practice, fast reponse speed is need. For improving the response speed of the pyroelectric detector some specific technology has been used in the preamplifier schematic. High sense and fast response character of the pyroelectric detector-preamplifier assembled device had been achieved. When the device is applied in acute concussion condition, it must survive from the acute concussion condition testing. For it reliability some specific technology was used in the device fabricating procedure. At last the performance parameter testing result and simulation application condition result given in this paper show the performance of the pyroelectric detector-preamplifier assembled device had achieved the advance goal.

  5. 14. INTERIOR VIEW TO THE SOUTH OF ROOM 136, COLD ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. INTERIOR VIEW TO THE SOUTH OF ROOM 136, COLD ASSEMBLY BAY NO. 2. - Nevada Test Site, Reactor Maintenance Assembly & Dissassembly Facility, Area 25, Jackass Flats, Junction of Roads F & G, Mercury, Nye County, NV

  6. 13. INTERIOR VIEW TO THE SOUTHEAST OF ROOM 101, COLD ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. INTERIOR VIEW TO THE SOUTHEAST OF ROOM 101, COLD ASSEMBLY BAY NO. 1. - Nevada Test Site, Reactor Maintenance Assembly & Dissassembly Facility, Area 25, Jackass Flats, Junction of Roads F & G, Mercury, Nye County, NV

  7. RFTA (Recycle Filter Tank Assembly) test fill

    NASA Image and Video Library

    2009-06-02

    ISS020-E-005984 (2 June 2009) --- European Space Agency astronaut Frank De Winne, Expedition 20 flight engineer, works with the Water Recovery System Recycle Filter Tank Assembly (RFTA) in the Destiny laboratory of the International Space Station.

  8. Integrated Advanced Microwave Sounding Unit-A (AMSU-A). Performance Verification Report: EOS AMSU-A1 and AMSU-A2 Receiver Assemblies

    NASA Technical Reports Server (NTRS)

    Ma, Y.

    1995-01-01

    The AMSU-A receiver subsystem comprises two separated receiver assemblies; AMSU-A1 and AMSU-A2 (P/N 1356441-1). The AMSU-A1 receiver contains 13 channels and the AMSU-A2 receiver 2 channels. The AMSU-A1 receiver assembly is further divided into two parts; AMSU-A1-1 (P/N 1356429-1) and AMSU-A1-2 (P/N 1356409-1), which contain 9 and 4 channels, respectively. The receiver assemblies are highlighted and illustrate the functional block diagrams of the AMSU-A1 and AMSU-A2 systems. The AMSU-A receiver subsystem stands in between the antenna and signal processing subsystems of the AMSU-A instrument and comprises the RF and IF components from isolators to attenuators. It receives the RF signals from the antenna subsystem, down-converts the RF signals to IF signals, amplifies and defines the IF signals to proper power level and frequency bandwidth as specified for each channel, and inputs the IF signals to the signal processing subsystem. This test report presents the test data of the EOS AMSU-A Flight Model No. 1 (FM-1) receiver subsystem. The tests are performed per the Acceptance Test Procedure for the AMSU-A Receiver Subsystem, AE-26002/6A. The functional performance tests are conducted either at the component or subsystem level. While the component-level tests are performed over the entire operating temperature range predicted by thermal analysis, the subsystem-level tests are conducted at ambient temperature only.

  9. Orbital transfer vehicle 3000 LBF thrust chamber assembly hot fire test program

    NASA Technical Reports Server (NTRS)

    Schneider, Judy; Hayden, Warren R.

    1988-01-01

    The Aerojet Orbital Transfer Vehicle (OTV) Thrust Chamber Assembly (TCA) concept consists of a hydrogen cooled chamber, and annular injector, and an oxygen cooled centerbody. The hot fire testing of a heat sink version of the chamber with only the throat section using hydrogen cooling is documented. Hydraulic performance of the injector and cooled throat were verified by water flow testing prior to TCA assembly. The cooled throat was proof tested to 3000 psia to verify the integrity of the codeposited EF nickel-cobalt closeout. The first set of hot fire tests were conducted with a heat sink throat to obtain heat flux information. After demonstration of acceptable heat fluxes, the heat sink throat was replaced with the LH2 cooled throat section. Fourteen tests were conducted with a heat sink chamber and throat at chamber pressures of 85 to 359 psia. The injector face was modified at this time to add more face coolant flow. Ten tests were then conducted at chamber pressures of 197 to 620 psia. Actual heat fluxes at the higher chamber pressure range were 23 percent higher than the average of 10 Btu/in 2 predicted.

  10. Advanced Gas Turbine (AGT) Technology Project

    NASA Technical Reports Server (NTRS)

    1986-01-01

    Engine testing, ceramic component fabrication and evaluation, component performance rig testing, and analytical studies comprised AGT 100 activities during the 1985 year. Ten experimental assemblies (builds) were evaluated using two engines. Accrued operating time was 120 hr of burning and 170 hr total, bringing cumulative total operating time to 395 hr, all devoid of major failures. Tests identified the generator seals as the primary working fluid leakage sources. Power transfer clutch operation was demonstrated. An alpha SiC gasifier rotor engine test resulted in blade tip failures. Recurring case vibration and shaft whip have limited gasifier shaft speeds to 84%. Ceramic components successfully engine tested now include the SiC scroll assembly, Si3N3 turbine rotor, combustor assembly, regenerator disk bulkhead, turbine vanes, piston rings, and couplings. A compressor shroud design change to reduce heat recirculation back to the inlet was executed. Ceramic components activity continues to focus on the development of state-of-the-art material strength characteristics in full-scale engine hardware. Fiber reinforced glass-ceramic composite turbine (inner) backplates were fabricated by Corning Glass Works. The BMAS/III material performed well in engine testing. Backplates of MAS material have not been engine tested.

  11. A comparative evaluation of genome assembly reconciliation tools.

    PubMed

    Alhakami, Hind; Mirebrahim, Hamid; Lonardi, Stefano

    2017-05-18

    The majority of eukaryotic genomes are unfinished due to the algorithmic challenges of assembling them. A variety of assembly and scaffolding tools are available, but it is not always obvious which tool or parameters to use for a specific genome size and complexity. It is, therefore, common practice to produce multiple assemblies using different assemblers and parameters, then select the best one for public release. A more compelling approach would allow one to merge multiple assemblies with the intent of producing a higher quality consensus assembly, which is the objective of assembly reconciliation. Several assembly reconciliation tools have been proposed in the literature, but their strengths and weaknesses have never been compared on a common dataset. We fill this need with this work, in which we report on an extensive comparative evaluation of several tools. Specifically, we evaluate contiguity, correctness, coverage, and the duplication ratio of the merged assembly compared to the individual assemblies provided as input. None of the tools we tested consistently improved the quality of the input GAGE and synthetic assemblies. Our experiments show an increase in contiguity in the consensus assembly when the original assemblies already have high quality. In terms of correctness, the quality of the results depends on the specific tool, as well as on the quality and the ranking of the input assemblies. In general, the number of misassemblies ranges from being comparable to the best of the input assembly to being comparable to the worst of the input assembly.

  12. Power, Avionics and Software - Phase 1.0:. [Subsystem Integration Test Report

    NASA Technical Reports Server (NTRS)

    Ivancic, William D.; Sands, Obed S.; Bakula, Casey J.; Oldham, Daniel R.; Wright, Ted; Bradish, Martin A.; Klebau, Joseph M.

    2014-01-01

    This report describes Power, Avionics and Software (PAS) 1.0 subsystem integration testing and test results that occurred in August and September of 2013. This report covers the capabilities of each PAS assembly to meet integration test objectives for non-safety critical, non-flight, non-human-rated hardware and software development. This test report is the outcome of the first integration of the PAS subsystem and is meant to provide data for subsequent designs, development and testing of the future PAS subsystems. The two main objectives were to assess the ability of the PAS assemblies to exchange messages and to perform audio testing of both inbound and outbound channels. This report describes each test performed, defines the test, the data, and provides conclusions and recommendations.

  13. Deployment/retraction ground testing of a large flexible solar array

    NASA Technical Reports Server (NTRS)

    Chung, D. T.

    1982-01-01

    The simulated zero-gravity ground testing of the flexible fold-up solar array consisting of eighty-four full-size panels (.368 m x .4 m each) is addressed. Automatic, hands-off extension, retraction, and lockup operations are included. Three methods of ground testing were investigated: (1) vertical testing; (2) horizontal testing, using an overhead water trough to support the panels; and (3) horizontal testing, using an overhead track in conjunction with a counterweight system to support the panels. Method 3 was selected as baseline. The wing/assembly vertical support structure, the five-tier overhead track, and the mast-element support track comprise the test structure. The flexible solar array wing assembly was successfully extended and retracted numerous times under simulated zero-gravity conditions.

  14. LCLS-II Cryomodules Production at Fermilab

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Arkan, Tug; Grimm, Chuck; Kaluzny, Joshua

    2017-05-01

    LCLS-II is an upgrade project for the linear coherent light source (LCLS) at SLAC. The LCLS-II linac will consist of thirty-five 1.3 GHz and two 3.9 GHz superconducting RF continuous wave (CW) cryomodules that Fermilab and Jefferson Lab (JLab) will assemble in collaboration with SLAC. The LCLS-II 1.3 GHz cryomodule design is based on the European XFEL pulsed-mode cryomodule design with modifications needed for CW operation. Fermilab and JLab will each assemble and test a prototype 1.3 GHz cryomodule to assess the results of the CW modifications, in advance of 16 and 17 production 1.3 GHz cryomodules, respectively. Fermilab ismore » solely responsible for the 3.9 GHz cryomodules. After the prototype cryomodule tests are complete and lessons learned incorporated, both laboratories will increase their cryomodule production rates to meet the challenging LCLS-II project requirement of approximately one cryomodule per month per laboratory. This paper presents the Fermilab Cryomodule Assembly Facility (CAF) infrastructure for LCLS-II cryomodule production, the Fermilab prototype 1.3 GHz CW cryomodule (pCM) assembly and readiness for production assembly.« less

  15. n/a

    NASA Image and Video Library

    1985-11-01

    The crew assigned to the STS-61B mission included (kneeling left to right) Bryan D. O’conner, pilot; and Brewster H. Shaw, commander. On the back row, left to right, are Charles D. Walker, payload specialist; mission specialists Jerry L. Ross, Mary L. Cleave, and Sherwood C. Spring; and Rodolpho Neri Vela, payload specialist. Launched aboard the Space Shuttle Atlantis November 28, 1985 at 7:29:00 pm (EST), the STS-61B mission’s primary payload included three communications satellites: MORELOS-B (Mexico); AUSSAT-2 (Autralia); and SATCOM KU-2 (RCA Americom. Two experiments were conducted to test assembling erectable structures in space: EASE (Experimental Assembly of Structures in Extravehicular Activity), and ACCESS (Assembly Concept for Construction of Erectable Space Structure). In a joint venture between NASA/Langley Research Center in Hampton, VA and Marshall Space Flight Center (MSFC), the Assembly Concept for Construction of Erectable Space Structures (ACCESS) was developed and demonstrated at MSFC's Neutral Buoyancy Simulator (NBS). The primary objective of this experiment was to test the ACCESS structural assembly concept for suitability as the framework for larger space structures and to identify ways to improve the productivity of space construction.

  16. STS-61B Crew Portrait

    NASA Technical Reports Server (NTRS)

    1985-01-01

    The crew assigned to the STS-61B mission included (kneeling left to right) Bryan D. O'conner, pilot; and Brewster H. Shaw, commander. On the back row, left to right, are Charles D. Walker, payload specialist; mission specialists Jerry L. Ross, Mary L. Cleave, and Sherwood C. Spring; and Rodolpho Neri Vela, payload specialist. Launched aboard the Space Shuttle Atlantis November 28, 1985 at 7:29:00 pm (EST), the STS-61B mission's primary payload included three communications satellites: MORELOS-B (Mexico); AUSSAT-2 (Autralia); and SATCOM KU-2 (RCA Americom. Two experiments were conducted to test assembling erectable structures in space: EASE (Experimental Assembly of Structures in Extravehicular Activity), and ACCESS (Assembly Concept for Construction of Erectable Space Structure). In a joint venture between NASA/Langley Research Center in Hampton, VA and Marshall Space Flight Center (MSFC), the Assembly Concept for Construction of Erectable Space Structures (ACCESS) was developed and demonstrated at MSFC's Neutral Buoyancy Simulator (NBS). The primary objective of this experiment was to test the ACCESS structural assembly concept for suitability as the framework for larger space structures and to identify ways to improve the productivity of space construction.

  17. Effect of thermal cycling ramp rate on CSP assembly reliability

    NASA Technical Reports Server (NTRS)

    Ghaffarian, R.

    2001-01-01

    A JPL-led chip scale package consortium of enterprises recently joined together to pool in-kind resources for developing the quality and reliability of chip scale packages for a variety of projects. The experience of the consortium in building more than 150 test vehicle assemblies, single and double sided multilayer PWBs, and the environmental test results has now been published as a chip scale package guidelines document.

  18. Ceramic Life Prediction Parameters

    DTIC Science & Technology

    1980-05-01

    preferential. A standard creep testing Satec machine with a modified load train assembly was used for tensile stress-rupture testing. The specimen is...to the standard Satec machine head which includes crossed (90°) knife edges. The assembly procedure includes hanging the load train parts from...the Satec head as influenced by gravity. At this point the lower Satec crossarm is lowered to snub the train in this position. The load train

  19. PowerPack Developments

    NASA Technical Reports Server (NTRS)

    2007-01-01

    A vintage 1960 J-2 thrust chamber is fitted with brackets and pumps recently at the Pratt & Whitney Rocketdyne assembly facility in Stennis Space Center's Building 9101. Together, the parts comprise the J-2X Powerpack 1A test article. Mississippi Space Services machined the new bracket (the V-shaped arm on the right), making this the first time parts for an engine test article were machined, welded and assembled on site at SSC.

  20. PowerPack Developments

    NASA Image and Video Library

    2007-04-11

    A vintage 1960 J-2 thrust chamber is fitted with brackets and pumps recently at the Pratt & Whitney Rocketdyne assembly facility in Stennis Space Center's Building 9101. Together, the parts comprise the J-2X Powerpack 1A test article. Mississippi Space Services machined the new bracket (the V-shaped arm on the right), making this the first time parts for an engine test article were machined, welded and assembled on site at SSC.

  1. Conducting Automated Test Assembly Using the Premium Solver Platform Version 7.0 with Microsoft Excel and the Large-Scale LP/QP Solver Engine Add-In

    ERIC Educational Resources Information Center

    Cor, Ken; Alves, Cecilia; Gierl, Mark J.

    2008-01-01

    This review describes and evaluates a software add-in created by Frontline Systems, Inc., that can be used with Microsoft Excel 2007 to solve large, complex test assembly problems. The combination of Microsoft Excel 2007 with the Frontline Systems Premium Solver Platform is significant because Microsoft Excel is the most commonly used spreadsheet…

  2. Neural syntax: cell assemblies, synapsembles and readers

    PubMed Central

    Buzsáki, György

    2010-01-01

    Summary A widely discussed hypothesis in neuroscience is that transiently active ensembles of neurons, known as ‘cell assemblies’, underlie numerous operations of the brain, from encoding memories to reasoning. However, the mechanisms responsible for the formation and disbanding of cell assemblies and temporal evolution of cell assembly sequences are not well understood. I introduce and review three interconnected topics, which could facilitate progress in defining cell assemblies, identifying their neuronal organization and revealing causal relationships between assembly organization and behavior. First, I hypothesize that cell assemblies are best understood in light of their output product, as detected by ‘reader-actuator’ mechanisms. Second, I suggest that the hierarchical organization of cell assemblies may be regarded as a neural syntax. Third, constituents of the neural syntax are linked together by dynamically changing constellations of synaptic weights (‘synapsembles’). Existing support for this tripartite framework is reviewed and strategies for experimental testing of its predictions are discussed. PMID:21040841

  3. Design and testing of the Space Station Freedom Propellant Tank Assembly

    NASA Technical Reports Server (NTRS)

    Dudley, D. D.; Thonet, T. A.; Goforth, A. M.

    1992-01-01

    Propellant storage and management functions for the Propulsion Module of the U.S. Space Station Freedom are provided by the Propellant Tank Assembly (PTA). The PTA consists of a surface-tension type propellant acquisition device contained within a welded titanium pressure vessel. The PTA design concept was selected with high reliability and low program risk as primary goals in order to meet stringent NASA structural, expulsion, fracture control and reliability requirements. The PTA design makes use of Shuttle Orbital Maneuvering System and Peacekeeper Propellant Storage Assembly design and analysis techniques. This paper summarizes the PTA design solution and discusses the underlying detailed analyses. In addition, design verification and qualification test activities are discussed.

  4. Macromolecular assemblies in reduced gravity environments

    NASA Technical Reports Server (NTRS)

    Moos, Philip J.; Hayes, James W.; Stodieck, Louis S.; Luttges, Marvin W.

    1990-01-01

    The assembly of protein macro molecules into structures commonly produced within biological systems was achieved using in vitro techniques carried out in nominal as well as reduced gravity environments. Appropriate hardware was designed and fabricated to support such studies. Experimental protocols were matched to the available reduced gravity test opportunities. In evaluations of tubulin, fibrin and collagen assembly products the influence of differing gravity test conditions are apparent. Product homogeneity and organization were characteristic enhancements documented in reduced gravity samples. These differences can be related to the fluid flow conditions that exist during in vitro product formation. Reduced gravity environments may provide a robust opportunity for directing the products formed in a variety of bioprocessing applications.

  5. Saturn Apollo Program

    NASA Image and Video Library

    1967-01-01

    NASA used barges for transporting full-sized stages for the Saturn I, Saturn IB, and Saturn V vehicles between the Marshall Space Flight Center (MSFC), the manufacturing plant at the Michoud Assembly Facility (MAF), the Mississippi Test Facility for testing, and the Kennedy Space Center. The barges traveled from the MSFC dock to the MAF, a total of 1,086.7 miles up the Tennessee River and down the Mississippi River. The barges also transported the assembled stages of the Saturn vehicle from the MAF to the Kennedy Space Center, a total of 932.4 miles along the Gulf of Mexico and up along the Atlantic Ocean, for the final assembly and the launch. This photograph shows the barge Orion at the MSFC dock.

  6. 4. EXTERIOR VIEW TO THE EAST OF THE WEST ELEVATION ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. EXTERIOR VIEW TO THE EAST OF THE WEST ELEVATION OF THE COLD ASSEMBLY AREA. - Nevada Test Site, Reactor Maintenance Assembly & Dissassembly Facility, Area 25, Jackass Flats, Junction of Roads F & G, Mercury, Nye County, NV

  7. 30 CFR 36.2 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... individual, partnership, company, corporation, association, or other organization, that designs, manufactures, assembles, or controls the assembly and that seeks a certificate of approval or preliminary testing of... designed. Permissible. As applied to mobile diesel-powered transportation equipment, this means that the...

  8. "Artificial micro organs"--a microfluidic device for dielectrophoretic assembly of liver sinusoids.

    PubMed

    Schütte, Julia; Hagmeyer, Britta; Holzner, Felix; Kubon, Massimo; Werner, Simon; Freudigmann, Christian; Benz, Karin; Böttger, Jan; Gebhardt, Rolf; Becker, Holger; Stelzle, Martin

    2011-06-01

    In order to study possible toxic side effects of potential drug compounds in vitro a reliable test system is needed. Predicting liver toxicity presents a major challenge of particular importance as liver cells grown in a cell culture suffer from a rapid loss of their liver specific functions. Therefore we are developing a new microfluidic test system for liver toxicity. This test system is based on an organ-like liver 3D co-culture of hepatocytes and endothelial cells. We devised a microfluidic chip featuring cell culture chambers with integrated electrodes for the assembly of liver sinusoids by dielectrophoresis. Fluid channels enable an organ-like perfusion with culture media and test compounds. Different chamber designs were studied and optimized with regard to dielectrophoretic force distribution, hydrodynamic flow profile, and cell trapping rate using numeric simulations. Based on simulation results a microchip was injection-moulded from COP. This chip allowed the assembly of viable hepatocytes and endothelial cells in a sinusoid-like fashion.

  9. Progress in FMIT test assembly development

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Opperman, E.K.; Vogel, M.A.; Shen, E.J.

    Research and development supporting the completed design of the Fusion Materials Irradiation Test (FMIT) Facility is continuing at the Hanford Engineering Development Laboratory (HEDL) in Richland, Washington. The FMIT, a deuteron accelerator based (d + Li) neutron source, will produce an intense flux of high energy neutrons for use in radiation damage studies of fusion reactor materials. The most intense flux magnitude of greater than 10/sup 15/ n/cm/sup 2/-s is located close to the neutron producing lithium target and is distributed within a volume about the size of an American football. The conceptual design and development of FMIT experiments calledmore » Test Assemblies has progressed over the past five years in parallel with the design of the FMIT. The paper will describe the recent accomplishments made in developing test assemblies appropriate for use in the limited volume close to the FMIT target where high neutron flux and heating rates and the associated spacial gradients significantly impact design considerations.« less

  10. Advanced superposition methods for high speed turbopump vibration analysis

    NASA Technical Reports Server (NTRS)

    Nielson, C. E.; Campany, A. D.

    1981-01-01

    The small, high pressure Mark 48 liquid hydrogen turbopump was analyzed and dynamically tested to determine the cause of high speed vibration at an operating speed of 92,400 rpm. This approaches the design point operating speed of 95,000 rpm. The initial dynamic analysis in the design stage and subsequent further analysis of the rotor only dynamics failed to predict the vibration characteristics found during testing. An advanced procedure for dynamics analysis was used in this investigation. The procedure involves developing accurate dynamic models of the rotor assembly and casing assembly by finite element analysis. The dynamically instrumented assemblies are independently rap tested to verify the analytical models. The verified models are then combined by modal superposition techniques to develop a completed turbopump model where dynamic characteristics are determined. The results of the dynamic testing and analysis obtained are presented and methods of moving the high speed vibration characteristics to speeds above the operating range are recommended. Recommendations for use of these advanced dynamic analysis procedures during initial design phases are given.

  11. J-2X engine assembly

    NASA Image and Video Library

    2011-03-03

    Pratt & Whitney Rocketdyne employees Carlos Alfaro (l) and Oliver Swanier work on the main combustion element of the J-2X rocket engine at their John C. Stennis Space Center facility. Assembly of the J-2X rocket engine to be tested at the site is under way, with completion and delivery to the A-2 Test Stand set for June. The J-2X is being developed as a next-generation engine that can carry humans into deep space. Stennis Space Center is preparing a trio of stands to test the new engine.

  12. Influence of Oxygenated Compounds on Reaction Products in a Microwave Plasma Methane Pyrolysis Assembly for Post-Processing of Sabatier Methane

    NASA Technical Reports Server (NTRS)

    Mansell, J. Matthew; Abney, Morgan B.; Miller, Lee A.

    2011-01-01

    The state-of-the-art Carbon Dioxide Reduction Assembly (CRA) was delivered to the International Space Station (ISS) in April 2010. The system is designed to accept carbon dioxide from the Carbon Dioxide Removal Assembly and hydrogen from the Oxygen Generation Assembly. The two gases are reacted in the CRA in a Sabatier reactor to produce water and methane. Venting of methane results in an oxygen resupply requirement of about 378 lbs per crew member per year. If the oxygen is supplied as water, the total weight for resupply is about 476 lb per crew member per year. For long-term missions beyond low Earth orbit, during which resupply capabilities will be further limited, recovery of hydrogen from methane is highly desirable. For this purpose, NASA is pursuing development of a Plasma Pyrolysis Assembly (PPA) capable of recovering hydrogen from methane. Under certain conditions, water vapor and carbon dioxide (nominally intended to be separated from the CRA outlet stream) may be present in the PPA feed stream. Thus, testing was conducted in 2010 to determine the effect of these "oxygenated" compounds on PPA performance, particularly the effect of inlet carbon dioxide and water variations on the PPA product stream. This paper discusses the test set-up, analysis, and results of this testing

  13. Influence of Oxygenated Compounds on Reaction Products in a Microwave Plasma Methane Pyrolysis Assembly for Post-Processing of Sabatier Methane

    NASA Technical Reports Server (NTRS)

    Mansell, J. Matthew; Abney, Morgan B.

    2012-01-01

    The state-of-the-art Carbon Dioxide Reduction Assembly (CRA) was delivered to the International Space Station (ISS) in April 2010. The system is designed to accept carbon dioxide from the Carbon Dioxide Removal Assembly and hydrogen from the Oxygen Generation Assembly. The two gases are reacted in the CRA in a Sabatier reactor to produce water and methane. Venting of methane results in an oxygen resupply requirement of about 378 lbs per crew member per year. If the oxygen is supplied as water, the total weight for resupply is about 476 lb per crew member per year. For long-term missions beyond low Earth orbit, during which resupply capabilities will be further limited, recovery of hydrogen from methane is highly desirable. For this purpose, NASA is pursuing development of a Plasma Pyrolysis Assembly (PPA) capable of recovering hydrogen from methane. Under certain conditions, water vapor and carbon dioxide (nominally intended to be separated from the CRA outlet stream) may be present in the PPA feed stream. Thus, testing was conducted in 2010 to determine the effect of these oxygenated compounds on PPA performance, particularly the effect of inlet carbon dioxide and water variations on the PPA product stream. This paper discusses the test set-up, analysis, and results of this testing.

  14. Robotic Assembly of Truss Structures for Space Systems and Future Research Plans

    NASA Technical Reports Server (NTRS)

    Doggett, William

    2002-01-01

    Many initiatives under study by both the space science and earth science communities require large space systems, i.e. with apertures greater than 15 m or dimensions greater than 20 m. This paper reviews the effort in NASA Langley Research Center's Automated Structural Assembly Laboratory which laid the foundations for robotic construction of these systems. In the Automated Structural Assembly Laboratory reliable autonomous assembly and disassembly of an 8 meter planar structure composed of 102 truss elements covered by 12 panels was demonstrated. The paper reviews the hardware and software design philosophy which led to reliable operation during weeks of near continuous testing. Special attention is given to highlight the features enhancing assembly reliability.

  15. RS-88 Pad Abort Demonstrator Thrust Chamber Assembly Testing at NASA Marshall Space Flight Center

    NASA Technical Reports Server (NTRS)

    Farr, Rebecca A.; Sanders, Timothy M.

    1990-01-01

    This paper documents the effort conducted to collect hot-tire dynamic and acoustics environments data during 50,000-lb thrust lox-ethanol hot-fire rocket testing at NASA Marshall Space Flight Center (MSFC) in November-December 2003. This test program was conducted during development testing of the Boeing Rocketdyne RS-88 development engine thrust chamber assembly (TCA) in support of the Orbital Space Plane (OSP) Crew Escape System Propulsion (CESP) Program Pad Abort Demonstrator (PAD). In addition to numerous internal TCA and nozzle measurements, induced acoustics environments data were also collected. Provided here is an overview of test parameters, a discussion of the measurements, test facility systems and test operations, and a quality assessment of the data collected during this test program.

  16. Precise Truss Assembly using Commodity Parts and Low Precision Welding

    NASA Technical Reports Server (NTRS)

    Komendera, Erik; Reishus, Dustin; Dorsey, John T.; Doggett, William R.; Correll, Nikolaus

    2013-01-01

    We describe an Intelligent Precision Jigging Robot (IPJR), which allows high precision assembly of commodity parts with low-precision bonding. We present preliminary experiments in 2D that are motivated by the problem of assembling a space telescope optical bench on orbit using inexpensive, stock hardware and low-precision welding. An IPJR is a robot that acts as the precise "jigging", holding parts of a local assembly site in place while an external low precision assembly agent cuts and welds members. The prototype presented in this paper allows an assembly agent (in this case, a human using only low precision tools), to assemble a 2D truss made of wooden dowels to a precision on the order of millimeters over a span on the order of meters. We report the challenges of designing the IPJR hardware and software, analyze the error in assembly, document the test results over several experiments including a large-scale ring structure, and describe future work to implement the IPJR in 3D and with micron precision.

  17. Gateway Vectors for Efficient Artificial Gene Assembly In Vitro and Expression in Yeast Saccharomyces cerevisiae

    PubMed Central

    Giuraniuc, Claudiu V.; MacPherson, Murray; Saka, Yasushi

    2013-01-01

    Construction of synthetic genetic networks requires the assembly of DNA fragments encoding functional biological parts in a defined order. Yet this may become a time-consuming procedure. To address this technical bottleneck, we have created a series of Gateway shuttle vectors and an integration vector, which facilitate the assembly of artificial genes and their expression in the budding yeast Saccharomyces cerevisiae. Our method enables the rapid construction of an artificial gene from a promoter and an open reading frame (ORF) cassette by one-step recombination reaction in vitro. Furthermore, the plasmid thus created can readily be introduced into yeast cells to test the assembled gene’s functionality. As flexible regulatory components of a synthetic genetic network, we also created new versions of the tetracycline-regulated transactivators tTA and rtTA by fusing them to the auxin-inducible degron (AID). Using our gene assembly approach, we made yeast expression vectors of these engineered transactivators, AIDtTA and AIDrtTA and then tested their functions in yeast. We showed that these factors can be regulated by doxycycline and degraded rapidly after addition of auxin to the medium. Taken together, the method for combinatorial gene assembly described here is versatile and would be a valuable tool for yeast synthetic biology. PMID:23675537

  18. Assembly considerations for large reflectors

    NASA Technical Reports Server (NTRS)

    Bush, H.

    1988-01-01

    The technologies developed at LaRC in the area of erectable instructures are discussed. The information is of direct value to the Large Deployable Reflector (LDR) because an option for the LDR backup structure is to assemble it in space. The efforts in this area, which include development of joints, underwater assembly simulation tests, flight assembly/disassembly tests, and fabrication of 5-meter trusses, led to the use of the LaRC concept as the baseline configuration for the Space Station Structure. The Space Station joint is linear in the load and displacement range of interest to Space Station; the ability to manually assemble and disassemble a 45-foot truss structure was demonstrated by astronauts in space as part of the ACCESS Shuttle Flight Experiment. The structure was built in 26 minutes 46 seconds, and involved a total of 500 manipulations of untethered hardware. Also, the correlation of the space experience with the neutral buoyancy simulation was very good. Sections of the proposed 5-meter bay Space Station truss have been built on the ground. Activities at LaRC have included the development of mobile remote manipulator systems (which can traverse the Space Station 5-meter structure), preliminary LDR sun shield concepts, LDR construction scenarios, and activities in robotic assembly of truss-type structures.

  19. Environmental Control and Life Support Systems Test Facility at MSFC

    NASA Technical Reports Server (NTRS)

    2001-01-01

    The Marshall Space Flight Center (MSFC) is responsible for designing and building the life support systems that will provide the crew of the International Space Station (ISS) a comfortable environment in which to live and work. Scientists and engineers at the MSFC are working together to provide the ISS with systems that are safe, efficient, and cost-effective. These compact and powerful systems are collectively called the Environmental Control and Life Support Systems, or simply, ECLSS. In this photograph, the life test area on the left of the MSFC ECLSS test facility is where various subsystems and components are tested to determine how long they can operate without failing and to identify components needing improvement. Equipment tested here includes the Carbon Dioxide Removal Assembly (CDRA), the Urine Processing Assembly (UPA), the mass spectrometer filament assemblies and sample pumps for the Major Constituent Analyzer (MCA). The Internal Thermal Control System (ITCS) simulator facility (in the module in the right) duplicates the function and operation of the ITCS in the ISS U.S. Laboratory Module, Destiny. This facility provides support for Destiny, including troubleshooting problems related to the ITCS.

  20. Visit from JAXA to NASA MSFC: The Engines Element & Ideas for Collaboration

    NASA Technical Reports Server (NTRS)

    Greene, William D.

    2013-01-01

    System Design, Development, and Fabrication: Design, develop, and fabricate or procure MB-60 component hardware compliant with the imposed technical requirements and in sufficient quantities to fulfill the overall MB-60 development effort. System Development, Assembly, and Test: Manage the scope of the development, assembly, and test-related activities for MB-60 development. This scope includes engine-level development planning, engine assembly and disassembly, test planning, engine testing, inspection, anomaly resolution, and development of necessary ground support equipment and special test equipment. System Integration: Provide coordinated integration in the realms of engineering, safety, quality, and manufacturing disciplines across the scope of the MB-60 design and associated products development Safety and Mission Assurance, structural design, fracture control, materials and processes, thermal analysis. Systems Engineering and Analysis: Manage and perform Systems Engineering and Analysis to provide rigor and structure to the overall design and development effort for the MB-60. Milestone reviews, requirements management, system analysis, program management support Program Management: Manage, plan, and coordinate the activities across all portions of the MB-60 work scope by providing direction for program administration, business management, and supplier management.

Top