Sample records for test facility replacement

  1. Replacement of Hydrochlorofluorocarbon (HCFC) -225 Solvent for Cleaning and Verification Sampling of NASA Propulsion Oxygen Systems Hardware, Ground Support Equipment, and Associated Test Systems

    NASA Technical Reports Server (NTRS)

    Burns, H. D.; Mitchell, M. A.; McMillian, J. H.; Farner, B. R.; Harper, S. A.; Peralta, S. F.; Lowrey, N. M.; Ross, H. R.; Juarez, A.

    2015-01-01

    Since the 1990's, NASA's rocket propulsion test facilities at Marshall Space Flight Center (MSFC) and Stennis Space Center (SSC) have used hydrochlorofluorocarbon-225 (HCFC-225), a Class II ozone-depleting substance, to safety clean and verify the cleanliness of large scale propulsion oxygen systems and associated test facilities. In 2012 through 2014, test laboratories at MSFC, SSC, and Johnson Space Center-White Sands Test Facility collaborated to seek out, test, and qualify an environmentally preferred replacement for HCFC-225. Candidate solvents were selected, a test plan was developed, and the products were tested for materials compatibility, oxygen compatibility, cleaning effectiveness, and suitability for use in cleanliness verification and field cleaning operations. Honewell Soltice (TradeMark) Performance Fluid (trans-1-chloro-3,3, 3-trifluoropropene) was selected to replace HCFC-225 at NASA's MSFC and SSC rocket propulsion test facilities.

  2. Refurbishment and Automation of the Thermal/Vacuum Facilities at the Goddard Space Flight Center

    NASA Technical Reports Server (NTRS)

    Donohue, John T.; Johnson, Chris; Ogden, Rick; Sushon, Janet

    1998-01-01

    The thermal/vacuum facilities located at the Goddard Space Flight Center (GSFC) have supported both manned and unmanned space flight since the 1960s. Of the 11 facilities, currently 10 of the systems are scheduled for refurbishment and/or replacement as part of a 5-year implementation. Expected return on investment includes the reduction in test schedules, improvements in the safety of facility operations, reduction in the complexity of a test and the reduction in personnel support required for a test. Additionally, GSFC will become a global resource renowned for expertise in thermal engineering, mechanical engineering and for the automation of thermal/vacuum facilities and thermal/vacuum tests. Automation of the thermal/vacuum facilities includes the utilization of Programmable Logic Controllers (PLCs) and the use of Supervisory Control and Data Acquisition (SCADA) systems. These components allow the computer control and automation of mechanical components such as valves and pumps. In some cases, the chamber and chamber shroud require complete replacement while others require only mechanical component retrofit or replacement. The project of refurbishment and automation began in 1996 and has resulted in the computer control of one Facility (Facility #225) and the integration of electronically controlled devices and PLCs within several other facilities. Facility 225 has been successfully controlled by PLC and SCADA for over one year. Insignificant anomalies have occurred and were resolved with minimal impact to testing and operations. The amount of work remaining to be performed will occur over the next four to five years. Fiscal year 1998 includes the complete refurbishment of one facility, computer control of the thermal systems in two facilities, implementation of SCADA and PLC systems to support multiple facilities and the implementation of a Database server to allow efficient test management and data analysis.

  3. Mechanical properties of the fiberglass prepreg system used for the National Transonic Facility replacement blade set

    NASA Technical Reports Server (NTRS)

    Young, Clarence P., Jr.; Wallace, John W.

    1991-01-01

    The results are presented of mechanical and physical properties characterization testing for the fiber glass prepreg system used to fabricate 15 of the replacement set of 25 fan blades for the National Transonic Facility. The fan blades were fabricated to be identical to the original blade set with the exception that the 7576 style E glass cloth used for the replacement set has a different surface finish than the original 7576 cloth. The 7781 E glass cloth and resin system were unchanged. The data are presented for elevated, room, and cryogenic temperatures. The results are compared with data from the original blade set and evaluated against selected structural design criteria. Test experience is described along with recommendations for future testing of these materials if required.

  4. Upgrades at the NASA Langley Research Center National Transonic Facility

    NASA Technical Reports Server (NTRS)

    Paryz, Roman W.

    2012-01-01

    Several projects have been completed or are nearing completion at the NASA Langley Research Center (LaRC) National Transonic Facility (NTF). The addition of a Model Flow-Control/Propulsion Simulation test capability to the NTF provides a unique, transonic, high-Reynolds number test capability that is well suited for research in propulsion airframe integration studies, circulation control high-lift concepts, powered lift, and cruise separation flow control. A 1992 vintage Facility Automation System (FAS) that performs the control functions for tunnel pressure, temperature, Mach number, model position, safety interlock and supervisory controls was replaced using current, commercially available components. This FAS upgrade also involved a design study for the replacement of the facility Mach measurement system and the development of a software-based simulation model of NTF processes and control systems. The FAS upgrades were validated by a post upgrade verification wind tunnel test. The data acquisition system (DAS) upgrade project involves the design, purchase, build, integration, installation and verification of a new DAS by replacing several early 1990's vintage computer systems with state of the art hardware/software. This paper provides an update on the progress made in these efforts. See reference 1.

  5. The New Heavy Gas Testing Capability in the NASA Langley Transonic Dynamics Tunnel

    NASA Technical Reports Server (NTRS)

    Cole, Stanley R.; Rivera, Jose A., Jr.

    1997-01-01

    The NASA Langley Transonic Dynamics Tunnel (TDT) has provided a unique capability for aeroelastic testing for over thirty-five years. The facility has a rich history of significant contributions to the design of many United States commercial transports and military aircraft. The facility has many features which contribute to its uniqueness for aeroelasticity testing; however, perhaps the most important facility capability is the use of a heavy gas test medium to achieve higher test densities. Higher test medium densities substantially improve model building requirements and therefore simplify the fabrication process for building aeroelastically scaled wind-tunnel models. The heavy gas also provides other testing benefits, including reduction in the power requirements to operate the facility during testing. Unfortunately, the use of the original heavy gas has been curtailed due to environmental concerns. A new gas, referred to as R-134a, has been identified as a suitable replacement for the former TDT heavy gas. The TDT is currently undergoing a facility upgrade to allow testing in R-134a heavy gas. This replacement gas will result in an operational test envelope, model scaling advantages, and general testing capabilities similar to those available with the former TDT heavy gas. As such, the TDT is expected to remain a viable facility for aeroelasticity research and aircraft dynamic clearance testing well into the 21st century. This paper describes the anticipated advantages and facility calibration plans for the new heavy gas and briefly reviews several past test programs that exemplify the possible benefits of heavy gas testing.

  6. Selection of Environmentally Friendly Solvents for the Extravehicular Mobility Unit Secondary Oxygen Pack Cold Trap Testing

    NASA Technical Reports Server (NTRS)

    Steele, John; Chullen, Cinda; Morenz, Jesse; Stephenson, Curtis

    2010-01-01

    Freon-113(TradeMark) has been used as a chemistry lab sampling solvent at NASA/JSC for EMU (extravehicular Mobility Unit) SOP (Secondary Oxygen Pack) oxygen testing Cold Traps utilized at the USA (United Space Alliance) Houston facility. Similar testing has occurred at the HSWL (Hamilton Sundstrand Windsor Locks) facility. A NASA Executive Order bans the procurement of all ODS (ozone depleting substances), including Freon-113 by the end of 2009. In order to comply with NASA direction, HSWL began evaluating viable solvents to replace Freon-113 . The study and testing effort to find Freon-113 replacements used for Cold Trap sampling is the subject of this paper. Test results have shown HFE-7100 (a 3M fluorinated ether) to be an adequate replacement for Freon-113 as a solvent to remove and measure the non-volatile residue collected in a Cold Trap during oxygen testing. Furthermore, S-316 (a Horiba Instruments Inc. high molecular weight, non-ODS chlorofluorocarbon) was found to be an adequate replacement for Freon-113 as a solvent to reconstitute non-volatile residue removed from a Cold Trap during oxygen testing for subsequent HC (hydrocarbon) analysis via FTIR (Fourier Transform Infrared Spectroscopy).

  7. Replacement of ozone depleting and toxic chemicals in gravimetric analysis of non-volatile residue

    NASA Technical Reports Server (NTRS)

    Arnold, G. S.; Uht, J. C.; Sinsheimer, F. B.

    1995-01-01

    The standard tests for determining nonvolatile residue accretion on spacecraft surfaces and in clean processing facilities rely on the use of halogenated solvents that are targeted for elimination because of their toxic or ozone-depleting natures. This paper presents a literature-based screening survey for candidate replacement solvents. Potential replacements were evaluated for their vapor pressure, toxicity, and solvent properties. Three likely candidates were identified: ethyl acetate, methyl acetate, and acetone. Laboratory tests are presented that evaluate the suitability of these candidate replacement solvents.

  8. ETR CRITICAL FACILITY (ETRCF), TRA654. SOUTH SIDE. CAMERA FACING NORTH ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    ETR CRITICAL FACILITY (ETR-CF), TRA-654. SOUTH SIDE. CAMERA FACING NORTH AND ROLL-UP DOOR. ORIGINAL SIDING HAS BEEN REPLACED WITH STUCCO-LIKE MATERIAL. INL NEGATIVE NO. HD46-40-1. Mike Crane, Photographer, 4/2005 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID

  9. KSC-06pd0022

    NASA Image and Video Library

    2006-01-11

    KENNEDY SPACE CENTER, FLA. - In the Thermal Protection System Facility, Tim Wright, engineering manager with United Space Alliance, tests a new tile, called "Boeing replacement insulation" or "BRI-18." The new tiles will gradually replace older tiles around main landing gear doors, external tank doors and nose landing gear doors. Currently, 10 tiles have been processed inside the facility. Discovery will receive the first BRI-18 tiles. Technicians inside the Orbiter Processing Facility are performing fit checks and will begin bonding the tiles to the vehicle this month. The raw material is manufactured by The Boeing Company in Huntington Beach, Calif. Replacing older tile with the BRI-18 tile in strategic areas is one of the Columbia Accident Investigation Board's recommendations to strengthen the orbiters. The tiles are more impact resistant than previous designs, enhancing the crew’s safety.

  10. KSC-06pd0021

    NASA Image and Video Library

    2006-01-11

    KENNEDY SPACE CENTER, FLA. - In the Thermal Protection System Facility, Tim Wright, engineering manager with United Space Alliance, tests a new tile, called "Boeing replacement insulation" or "BRI-18." The new tiles will gradually replace older tiles around main landing gear doors, external tank doors and nose landing gear doors. Currently, 10 tiles have been processed inside the facility. Discovery will receive the first BRI-18 tiles. Technicians inside the Orbiter Processing Facility are performing fit checks and will begin bonding the tiles to the vehicle this month. The raw material is manufactured by The Boeing Company in Huntington Beach, Calif. Replacing older tile with the BRI-18 tile in strategic areas is one of the Columbia Accident Investigation Board's recommendations to strengthen the orbiters. The tiles are more impact resistant than previous designs, enhancing the crew’s safety.

  11. Facility Upgrade/Replacement Tasks ('planned') at the NASA Glenn Research Center 10x10 Supersonic Wind Tunnel

    NASA Technical Reports Server (NTRS)

    Giriunas, Julius A.

    2012-01-01

    Facility upgrades and large maintenance tasks needed at the NASA Glenn 10x10 Supersonic Wind Tunnel requires significant planning to make sure implementation proceeds in an efficiently and cost effective manner. Advanced planning to secure the funding, complete design efforts and schedule the installation needs to be thought out years in advance to avoid interference with wind tunnel testing. This presentation describes five facility tasks planned for implementation over the next few years. The main focus of the presentation highlights the efforts on possible replacement of the diesel generator and the rationale behind the effort.

  12. Modernization of B-2 Data, Video, and Control Systems Infrastructure

    NASA Technical Reports Server (NTRS)

    Cmar, Mark D.; Maloney, Christian T.; Butala, Vishal D.

    2012-01-01

    The National Aeronautics and Space Administration (NASA) Glenn Research Center (GRC) Plum Brook Station (PBS) Spacecraft Propulsion Research Facility, commonly referred to as B-2, is NASA s third largest thermal-vacuum facility with propellant systems capability. B-2 has completed a modernization effort of its facility legacy data, video and control systems infrastructure to accommodate modern integrated testing and Information Technology (IT) Security requirements. Integrated systems tests have been conducted to demonstrate the new data, video and control systems functionality and capability. Discrete analog signal conditioners have been replaced by new programmable, signal processing hardware that is integrated with the data system. This integration supports automated calibration and verification of the analog subsystem. Modern measurement systems analysis (MSA) tools are being developed to help verify system health and measurement integrity. Legacy hard wired digital data systems have been replaced by distributed Fibre Channel (FC) network connected digitizers where high speed sampling rates have increased to 256,000 samples per second. Several analog video cameras have been replaced by digital image and storage systems. Hard-wired analog control systems have been replaced by Programmable Logic Controllers (PLC), fiber optic networks (FON) infrastructure and human machine interface (HMI) operator screens. New modern IT Security procedures and schemes have been employed to control data access and process control flows. Due to the nature of testing possible at B-2, flexibility and configurability of systems has been central to the architecture during modernization.

  13. Modernization of B-2 Data, Video, and Control Systems Infrastructure

    NASA Technical Reports Server (NTRS)

    Cmar, Mark D.; Maloney, Christian T.; Butala, Vishal D.

    2012-01-01

    The National Aeronautics and Space Administration (NASA) Glenn Research Center (GRC) Plum Brook Station (PBS) Spacecraft Propulsion Research Facility, commonly referred to as B-2, is NASA's third largest thermal-vacuum facility with propellant systems capability. B-2 has completed a modernization effort of its facility legacy data, video and control systems infrastructure to accommodate modern integrated testing and Information Technology (IT) Security requirements. Integrated systems tests have been conducted to demonstrate the new data, video and control systems functionality and capability. Discrete analog signal conditioners have been replaced by new programmable, signal processing hardware that is integrated with the data system. This integration supports automated calibration and verification of the analog subsystem. Modern measurement systems analysis (MSA) tools are being developed to help verify system health and measurement integrity. Legacy hard wired digital data systems have been replaced by distributed Fibre Channel (FC) network connected digitizers where high speed sampling rates have increased to 256,000 samples per second. Several analog video cameras have been replaced by digital image and storage systems. Hard-wired analog control systems have been replaced by Programmable Logic Controllers (PLC), fiber optic networks (FON) infrastructure and human machine interface (HMI) operator screens. New modern IT Security procedures and schemes have been employed to control data access and process control flows. Due to the nature of testing possible at B-2, flexibility and configurability of systems has been central to the architecture during modernization.

  14. Results of the Test Program for Replacement of AK-225G Solvent for Cleaning NASA Propulsion Oxygen Systems

    NASA Technical Reports Server (NTRS)

    Lowrey, Nikki M.; Mitchell, Mark A.

    2016-01-01

    Since the 1990's, when the Class I Ozone Depleting Substance (ODS) chlorofluorocarbon-113 (CFC-113) was banned, NASA's propulsion test facilities at Marshall Space Flight Center (MSFC) and Stennis Space Center (SSC) have relied upon the solvent AsahiKlin AK-225 (hydrochlorofluorocarbon-225ca/cb or HCFC-225ca/cb) and, more recently AK-225G (the single isomer form, HCFC-225cb) to safely clean and verify the cleanliness of large scale propulsion oxygen systems. Effective January 1, 2015, the production, import, export, and new use of Class II Ozone Depleting Substances, including AK-225G, was prohibited in the United States by the Clean Air Act. In 2012 through 2014, NASA test labs at MSFC, SSC, and Johnson Space Center's White Sands Test Facility (WSTF) collaborated to seek out, test, and qualify a solvent replacement for AK-225G that is both an effective cleaner and safe for use with oxygen systems. This paper summarizes the tests performed, results, and lessons learned.

  15. Results of the Test Program for Replacement of AK-225G Solvent for Cleaning NASA Propulsion Oxygen Systems

    NASA Technical Reports Server (NTRS)

    Lowrey, Nikki M.; Mitchell, Mark A.

    2016-01-01

    Since the 1990's, when the Class I Ozone Depleting Substance chlorofluorocarbon-113 was banned, NASA's propulsion test facilities at Marshall Space Flight Center and Stennis Space Center have relied upon the solvent Asahiklin AK-225 (hydrochlorofluorocarbon-225ca/cb or HCFC-225ca/cb) and, more recently AK-225G (the single isomer form, HCFC-225cb) to safely clean and verify the cleanliness of large scale propulsion oxygen systems. Effective January 1, 2015, the production, import, export, and new use of Class II Ozone Depleting Substances, including AK-225G, was prohibited in the United States by the Clean Air Act. In 2012 through 2014, NASA test labs at MSFC, SSC, and Johnson Space Center's White Sands Test Facility collaborated to seek out, test, and qualify a solvent replacement for AK-225G that is both an effective cleaner and safe for use with oxygen systems. This paper summarizes the tests performed, results, and lessons learned.

  16. Draft environmental impact statement: Space Shuttle Advanced Solid Rocket Motor Program

    NASA Technical Reports Server (NTRS)

    1988-01-01

    The proposed action is design, development, testing, and evaluation of Advanced Solid Rocket Motors (ASRM) to replace the motors currently used to launch the Space Shuttle. The proposed action includes design, construction, and operation of new government-owned, contractor-operated facilities for manufacturing and testing the ASRM's. The proposed action also includes transport of propellant-filled rocket motor segments from the manufacturing facility to the testing and launch sites and the return of used and/or refurbished segments to the manufacturing site.

  17. Replacement of HCFC-225 Solvent for Cleaning NASA Propulsion Oxygen Systems

    NASA Technical Reports Server (NTRS)

    Lowrey, Nikki M.; Mitchell, Mark A.

    2015-01-01

    Since the 1990's, when the Class I Ozone Depleting Substance (ODS) chlorofluorocarbon-113 (CFC-113) was banned, NASA's propulsion test facilities at Marshall Space Flight Center (MSFC) and Stennis Space Center (SSC) have relied upon hydrochlorofluorocarbon-225 (HCFC-225) to safely clean and verify the cleanliness of large scale propulsion oxygen systems. Effective January 1, 2015, the production, import, export, and new use of HCFC-225, a Class II ODS, was prohibited by the Clean Air Act. In 2012 through 2014, leveraging resources from both NASA and the Defense Logistics Agency - Aviation Hazardous Minimization and Green Products Branch, test labs at MSFC, SSC, and Johnson Space Center's White Sands Test Facility (WSTF) collaborated to seek out, test, and qualify a replacement for HCFC-225 that is both an effective cleaner and safe for use with oxygen systems. This presentation summarizes the tests performed, results, and lessons learned. It also demonstrates the benefits of cross-agency collaboration in a time of limited resources.

  18. An Investment Level Decision Method to Secure Long-term Reliability

    NASA Astrophysics Data System (ADS)

    Bamba, Satoshi; Yabe, Kuniaki; Seki, Tomomichi; Shibaya, Tetsuji

    The slowdown in power demand increase and facility replacement causes the aging and lower reliability in power facility. And the aging is followed by the rapid increase of repair and replacement when many facilities reach their lifetime in future. This paper describes a method to estimate the repair and replacement costs in future by applying the life-cycle cost model and renewal theory to the historical data. This paper also describes a method to decide the optimum investment plan, which replaces facilities in the order of cost-effectiveness by setting replacement priority formula, and the minimum investment level to keep the reliability. Estimation examples applied to substation facilities show that the reasonable and leveled future cash-out can keep the reliability by lowering the percentage of replacements caused by fatal failures.

  19. Refurbishment and Automation of Thermal Vacuum Facilities at NASA/GSFC

    NASA Technical Reports Server (NTRS)

    Dunn, Jamie; Gomez, Carlos; Donohue, John; Johnson, Chris; Palmer, John; Sushon, Janet

    1999-01-01

    The thermal vacuum facilities located at the Goddard Space Flight Center (GSFC) have supported both manned and unmanned space flight since the 1960s. Of the eleven facilities, currently ten of the systems are scheduled for refurbishment or replacement as part of a five-year implementation. Expected return on investment includes the reduction in test schedules, improvements in safety of facility operations, and reduction in the personnel support required for a test. Additionally, GSFC will become a global resource renowned for expertise in thermal engineering, mechanical engineering, and for the automation of thermal vacuum facilities and tests. Automation of the thermal vacuum facilities includes the utilization of Programmable Logic Controllers (PLCs), the use of Supervisory Control and Data Acquisition (SCADA) systems, and the development of a centralized Test Data Management System. These components allow the computer control and automation of mechanical components such as valves and pumps. The project of refurbishment and automation began in 1996 and has resulted in complete computer control of one facility (Facility 281), and the integration of electronically controlled devices and PLCs in multiple others.

  20. Refurbishment and Automation of Thermal Vacuum Facilities at NASA/GSFC

    NASA Technical Reports Server (NTRS)

    Dunn, Jamie; Gomez, Carlos; Donohue, John; Johnson, Chris; Palmer, John; Sushon, Janet

    1998-01-01

    The thermal vacuum facilities located at the Goddard Space Flight Center (GSFC) have supported both manned and unmanned space flight since the 1960s. Of the eleven facilities, currently ten of the systems are scheduled for refurbishment or replacement as part of a five-year implementation. Expected return on investment includes the reduction in test schedules, improvements in safety of facility operations, and reduction in the personnel support required for a test. Additionally, GSFC will become a global resource renowned for expertise in thermal engineering, mechanical engineering, and for the automation of thermal vacuum facilities and tests. Automation of the thermal vacuum facilities includes the utilization of Programmable Logic Controllers (PLCs), the use of Supervisory Control and Data Acquisition (SCADA) systems, and the development of a centralized Test Data Management System. These components allow the computer control and automation of mechanical components such as valves and pumps. The project of refurbishment and automation began in 1996 and has resulted in complete computer control of one facility (Facility 281), and the integration of electronically controlled devices and PLCs in multiple others.

  1. Model-Scale Aerodynamic Performance Testing of Proposed Modifications to the NASA Langley Low Speed Aeroacoustic Wind Tunnel

    NASA Technical Reports Server (NTRS)

    Booth, Earl R., Jr.; Coston, Calvin W., Jr.

    2005-01-01

    Tests were performed on a 1/20th-scale model of the Low Speed Aeroacoustic Wind Tunnel to determine the performance effects of insertion of acoustic baffles in the tunnel inlet, replacement of the existing collector with a new collector design in the open jet test section, and addition of flow splitters to the acoustic baffle section downstream of the test section. As expected, the inlet baffles caused a reduction in facility performance. About half of the performance loss was recovered by addition the flow splitters to the downstream baffles. All collectors tested reduced facility performance. However, test chamber recirculation flow was reduced by the new collector designs and shielding of some of the microphones was reduced owing to the smaller size of the new collector. Overall performance loss in the facility is expected to be a 5 percent top flow speed reduction, but the facility will meet OSHA limits for external noise levels and recirculation in the test section will be reduced.

  2. Replacement of Hydrochlorofluorocarbon (HCFC) -225 Solvent for Cleaning and Verification Sampling of NASA Propulsion Oxygen Systems Hardware, Ground Support Equipment, and Associated Test Systems

    NASA Technical Reports Server (NTRS)

    Mitchell, Mark A.; Lowrey, Nikki M.

    2015-01-01

    Since the 1990's, when the Class I Ozone Depleting Substance (ODS) chlorofluorocarbon-113 (CFC-113) was banned, NASA's rocket propulsion test facilities at Marshall Space Flight Center (MSFC) and Stennis Space Center (SSC) have relied upon hydrochlorofluorocarbon-225 (HCFC-225) to safely clean and verify the cleanliness of large scale propulsion oxygen systems. Effective January 1, 2015, the production, import, export, and new use of HCFC-225, a Class II ODS, was prohibited by the Clean Air Act. In 2012 through 2014, leveraging resources from both the NASA Rocket Propulsion Test Program and the Defense Logistics Agency - Aviation Hazardous Minimization and Green Products Branch, test labs at MSFC, SSC, and Johnson Space Center's White Sands Test Facility (WSTF) collaborated to seek out, test, and qualify a replacement for HCFC-225 that is both an effective cleaner and safe for use with oxygen systems. Candidate solvents were selected and a test plan was developed following the guidelines of ASTM G127, Standard Guide for the Selection of Cleaning Agents for Oxygen Systems. Solvents were evaluated for materials compatibility, oxygen compatibility, cleaning effectiveness, and suitability for use in cleanliness verification and field cleaning operations. Two solvents were determined to be acceptable for cleaning oxygen systems and one was chosen for implementation at NASA's rocket propulsion test facilities. The test program and results are summarized. This project also demonstrated the benefits of cross-agency collaboration in a time of limited resources.

  3. 75 FR 67711 - Extension of Scoping Period for the Supplemental Environmental Impact Statement for the Nuclear...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-03

    ... Statement for the Nuclear Facility Portion of the Chemistry and Metallurgy Research Building Replacement... Statement for the Nuclear Facility Portion of the Chemistry and Metallurgy Research Building Replacement... facility portion of the Chemistry and Metallurgy Research Building Replacement Project (CMRR-NF) at Los...

  4. Replacement of HCFC-225 Solvent for Cleaning NASA Propulsion Oxygen Systems

    NASA Technical Reports Server (NTRS)

    Mitchell, Mark A.; Lowrey, Nikki M.

    2015-01-01

    Since the 1990's, when the Class I Ozone Depleting Substance (ODS) chlorofluorocarbon-113 (CFC-113) was banned, NASA's rocket propulsion test facilities at Marshall Space Flight Center (MSFC) and Stennis Space Center (SSC) have relied upon hydrochlorofluorocarbon-225 (HCFC-225) to safely clean and verify the cleanliness of large scale propulsion oxygen systems. Effective January 1, 2015, the production, import, export, and new use of HCFC-225, a Class II ODS, was prohibited by the Clean Air Act. In 2012 through 2014, leveraging resources from both the NASA Rocket Propulsion Test Program and the Defense Logistics Agency - Aviation Hazardous Minimization and Green Products Branch, test labs at MSFC, SSC, and Johnson Space Center's White Sands Test Facility (WSTF) collaborated to seek out, test, and qualify a replacement for HCFC-225 that is both an effective cleaner and safe for use with oxygen systems. Candidate solvents were selected and a test plan was developed following the guidelines of ASTM G127, Standard Guide for the Selection of Cleaning Agents for Oxygen Systems. Solvents were evaluated for materials compatibility, oxygen compatibility, cleaning effectiveness, and suitability for use in cleanliness verification and field cleaning operations. Two solvents were determined to be acceptable for cleaning oxygen systems and one was chosen for implementation at NASA's rocket propulsion test facilities. The test program and results are summarized. This project also demonstrated the benefits of cross-agency collaboration in a time of limited resources.

  5. An Experimental Investigation of Damaged Arresting Gear Tapes for the Langley Aircraft Landing Dynamics Facility

    NASA Technical Reports Server (NTRS)

    Mason, Angela J.

    1999-01-01

    An experimental investigation was performed on damaged arresting gear tapes at the Langley Aircraft Landing Dynamics Facility. The arrestment system uses five pairs of tapes to bring the test carriage to a halt. The procedure used to determine when to replace the tapes consists of a close evaluation of each of the 10 tapes after each run. During this evaluation, each tape is examined thoroughly and any damage observed on the tape is recorded. If the damaged tape does not pass the inspection, the tape is replaced with a new one. For the past 13 years, the most commonly seen damage types are edge fray damage and transverse damage. Tests were conducted to determine the maximum tensile strength of a damaged arresting gear tape specimen. The data indicate that tapes exhibiting transverse damage can withstand higher loads than tapes with edge fray damage.

  6. Instrument Systems Analysis and Verification Facility (ISAVF) users guide

    NASA Technical Reports Server (NTRS)

    Davis, J. F.; Thomason, J. O.; Wolfgang, J. L.

    1985-01-01

    The ISAVF facility is primarily an interconnected system of computers, special purpose real time hardware, and associated generalized software systems, which will permit the Instrument System Analysts, Design Engineers and Instrument Scientists, to perform trade off studies, specification development, instrument modeling, and verification of the instrument, hardware performance. It is not the intent of the ISAVF to duplicate or replace existing special purpose facilities such as the Code 710 Optical Laboratories or the Code 750 Test and Evaluation facilities. The ISAVF will provide data acquisition and control services for these facilities, as needed, using remote computer stations attached to the main ISAVF computers via dedicated communication lines.

  7. Facility Accounting: Hammering Out a Capital Replacement Budget.

    ERIC Educational Resources Information Center

    Readinger, Jay

    1996-01-01

    Most facility and finance managers cannot adequately handle school infrastructure issues because they lack the tools to describe the problem appropriately. Facility accounting gives managers accurate deferral and projected replacement costs, using nationally recognized life-cycle and cost data. Facility accounting enables proper management of…

  8. Guidance on the Stand Down, Mothball, and Reactivation of Ground Test Facilities

    NASA Technical Reports Server (NTRS)

    Volkman, Gregrey T.; Dunn, Steven C.

    2013-01-01

    The development of aerospace and aeronautics products typically requires three distinct types of testing resources across research, development, test, and evaluation: experimental ground testing, computational "testing" and development, and flight testing. Over the last twenty plus years, computational methods have replaced some physical experiments and this trend is continuing. The result is decreased utilization of ground test capabilities and, along with market forces, industry consolidation, and other factors, has resulted in the stand down and oftentimes closure of many ground test facilities. Ground test capabilities are (and very likely will continue to be for many years) required to verify computational results and to provide information for regimes where computational methods remain immature. Ground test capabilities are very costly to build and to maintain, so once constructed and operational it may be desirable to retain access to those capabilities even if not currently needed. One means of doing this while reducing ongoing sustainment costs is to stand down the facility into a "mothball" status - keeping it alive to bring it back when needed. Both NASA and the US Department of Defense have policies to accomplish the mothball of a facility, but with little detail. This paper offers a generic process to follow that can be tailored based on the needs of the owner and the applicable facility.

  9. Geographic disparities in patient travel for dialysis in the United States.

    PubMed

    Stephens, J Mark; Brotherton, Samuel; Dunning, Stephan C; Emerson, Larry C; Gilbertson, David T; Harrison, David J; Kochevar, John J; McClellan, Ann C; McClellan, William M; Wan, Shaowei; Gitlin, Matthew

    2013-01-01

    To estimate travel distance and time for US hemodialysis patients and to compare travel of rural versus urban patients. Dialysis patient residences were estimated from ZIP code-level patient counts as of February 2011 allocated within the ZIP code proportional to census tract-level population, obtained from the 2010 U.S. Census. Dialysis facility addresses were obtained from Medicare public-use files. Patients were assigned to an "original" and "replacement" facility, assuming patients used the facility closest to home and would select the next closest facility as a replacement, if a replacement facility was required. Driving distances and times were calculated between patient residences and facility locations using GIS software. The mean one-way driving distance to the original facility was 7.9 miles; for rural patients average distances were 2.5 times farther than for urban patients (15.9 vs. 6.2 miles). Mean driving distance to a replacement facility was 10.6 miles, with rural patients traveling on average 4 times farther than urban patients to a replacement facility (28.8 vs. 6.8 miles). Rural patients travel much longer distances for dialysis than urban patients. Accessing alternative facilities, if required, would greatly increase rural patient travel, while having little impact on urban patients. Increased travel could have clinical implications as longer travel is associated with increased mortality and decreased quality of life. © 2013 National Rural Health Association.

  10. Materials, processes, and environmental engineering network

    NASA Technical Reports Server (NTRS)

    White, Margo M.

    1993-01-01

    The Materials, Processes, and Environmental Engineering Network (MPEEN) was developed as a central holding facility for materials testing information generated by the Materials and Processes Laboratory. It contains information from other NASA centers and outside agencies, and also includes the NASA Environmental Information System (NEIS) and Failure Analysis Information System (FAIS) data. Environmental replacement materials information is a newly developed focus of MPEEN. This database is the NASA Environmental Information System, NEIS, which is accessible through MPEEN. Environmental concerns are addressed regarding materials identified by the NASA Operational Environment Team, NOET, to be hazardous to the environment. An environmental replacement technology database is contained within NEIS. Environmental concerns about materials are identified by NOET, and control or replacement strategies are formed. This database also contains the usage and performance characteristics of these hazardous materials. In addition to addressing environmental concerns, MPEEN contains one of the largest materials databases in the world. Over 600 users access this network on a daily basis. There is information available on failure analysis, metals and nonmetals testing, materials properties, standard and commercial parts, foreign alloy cross-reference, Long Duration Exposure Facility (LDEF) data, and Materials and Processes Selection List data.

  11. 34 CFR 395.6 - Vendor ownership of vending facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... facility in good repair and in an attractive condition and replace worn-out or obsolete equipment; and if... facility in good repair and in an attractive condition and replace worn-out or obsolete equipment, or...

  12. 34 CFR 395.6 - Vendor ownership of vending facilities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... facility in good repair and in an attractive condition and replace worn-out or obsolete equipment; and if... facility in good repair and in an attractive condition and replace worn-out or obsolete equipment, or...

  13. Environmental impact statement Space Shuttle advanced solid rocket motor program

    NASA Technical Reports Server (NTRS)

    1989-01-01

    The proposed action is design, development, testing, and evaluation of Advanced Solid Rocket Motors (ASRM) to replace the motors currently used to launch the Space Shuttle. The proposed action includes design, construction, and operation of new government-owned, contractor-operated facilities for manufacturing and testing the ASRM's. The proposed action also includes transport of propellant-filled rocket motor segments from the manufacturing facility to the testing and launch sites and the return of used and/or refurbished segments to the manufacturing site. Sites being considered for the new facilities include John C. Stennis Space Center, Hancock County, Mississippi; the Yellow Creek site in Tishomingo County, Mississippi, which is currently in the custody and control of the Tennessee Valley Authority; and John F. Kennedy Space Center, Brevard County, Florida. TVA proposes to transfer its site to the custody and control of NASA if it is the selected site. All facilities need not be located at the same site. Existing facilities which may provide support for the program include Michoud Assembly Facility, New Orleans Parish, Louisiana; and Slidell Computer Center, St. Tammany Parish, Louisiana. NASA's preferred production location is the Yellow Creek site, and the preferred test location is the Stennis Space Center.

  14. KSC-04pd1975

    NASA Image and Video Library

    2004-09-22

    KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility, workers conduct a post-delivery verification test on a Control Moment Gyro (CMG) that is scheduled to fly on mission STS-114. The CMG will replace another on the International Space Station, which will require a spacewalk.

  15. KSC-04pd1977

    NASA Image and Video Library

    2004-09-22

    KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility, workers conduct a post-delivery verification test on a Control Moment Gyro (CMG) that is scheduled to fly on mission STS-114. The CMG will replace another on the International Space Station, which will require a spacewalk.

  16. KSC-04pd1976

    NASA Image and Video Library

    2004-09-22

    KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility, workers conduct a post-delivery verification test on a Control Moment Gyro (CMG) that is scheduled to fly on mission STS-114. The CMG will replace another on the International Space Station, which will require a spacewalk.

  17. Staubli TX-90XL robot qualification at the LLIHE.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Covert, Timothy Todd

    The Light Initiated High Explosive (LIHE) Facility uses a robotic arm to spray explosive material onto test items for impulse tests. In 2007, the decision was made to replace the existing PUMA 760 robot with the Staubli TX-90XL. A qualification plan was developed and implemented to verify the safe operating conditions and failure modes of the new system. The robot satisfied the safety requirements established in the qualification plan. A performance issue described in this report remains unresolved at the time of this publication. The final readiness review concluded the qualification of this robot at the LIHE facility.

  18. Magnetohydrodynamics (MHD) Engineering Test Facility (ETF) 200 MWe power plant. Conceptual Design Engineering Report (CDER). Volume 2: Engineering. Volume 3: Costs and schedules

    NASA Astrophysics Data System (ADS)

    1981-09-01

    Engineering design details for the principal systems, system operating modes, site facilities, and structures of an engineering test facility (ETF) of a 200 MWE power plant are presented. The ETF resembles a coal-fired steam power plant in many ways. It is analogous to a conventional plant which has had the coal combustor replaced with the MHD power train. Most of the ETF components are conventional. They can, however, be sized or configured differently or perform additional functions from those in a conventional coal power plant. The boiler not only generates steam, but also performs the functions of heating the MHD oxidant, recovering seed, and controlling emissions.

  19. Recent Productivity Improvements to the National Transonic Facility

    NASA Technical Reports Server (NTRS)

    Popernack, Thomas G., Jr.; Sydnor, George H.

    1998-01-01

    Productivity gains have recently been made at the National Transonic Facility wind tunnel at NASA Langley Research Center. A team was assigned to assess and set productivity goals to achieve the desired operating cost and output of the facility. Simulations have been developed to show the sensitivity of selected process productivity improvements in critical areas to reduce overall test cycle times. The improvements consist of an expanded liquid nitrogen storage system, a new fan drive, a new tunnel vent stack heater, replacement of programmable logic controllers, an increased data communications speed, automated test sequencing, and a faster model changeout system. Where possible, quantifiable results of these improvements are presented. Results show that in most cases, improvements meet the productivity gains predicted by the simulations.

  20. Magnetohydrodynamics (MHD) Engineering Test Facility (ETF) 200 MWe power plant. Conceptual Design Engineering Report (CDER). Volume 2: Engineering. Volume 3: Costs and schedules

    NASA Technical Reports Server (NTRS)

    1981-01-01

    Engineering design details for the principal systems, system operating modes, site facilities, and structures of an engineering test facility (ETF) of a 200 MWE power plant are presented. The ETF resembles a coal-fired steam power plant in many ways. It is analogous to a conventional plant which has had the coal combustor replaced with the MHD power train. Most of the ETF components are conventional. They can, however, be sized or configured differently or perform additional functions from those in a conventional coal power plant. The boiler not only generates steam, but also performs the functions of heating the MHD oxidant, recovering seed, and controlling emissions.

  1. NASA Langley Low Speed Aeroacoustic Wind Tunnel: Background Noise and Flow Survey Results Prior to FY05 Construction of Facilities Modifications

    NASA Technical Reports Server (NTRS)

    Booth, Earl R., Jr.; Henderson, Brenda S.

    2005-01-01

    The NASA Langley Research Center Low Speed Aeroacoustic Wind Tunnel is a premier facility for model-scale testing of jet noise reduction concepts at realistic flow conditions. However, flow inside the open jet test section is less than optimum. A Construction of Facilities project, scheduled for FY 05, will replace the flow collector with a new design intended to reduce recirculation in the open jet test section. The reduction of recirculation will reduce background noise levels measured by a microphone array impinged by the recirculation flow and will improve flow characteristics in the open jet tunnel flow. In order to assess the degree to which this modification is successful, background noise levels and tunnel flow are documented, in order to establish a baseline, in this report.

  2. Aero-Thermal Calibration of the NASA Glenn Icing Research Tunnel (2012 Tests)

    NASA Technical Reports Server (NTRS)

    Pastor-Barsi, Christine; Allen, Arrington E.

    2013-01-01

    A full aero-thermal calibration of the NASA Glenn Icing Research Tunnel (IRT) was completed in 2012 following the major modifications to the facility that included replacement of the refrigeration plant and heat exchanger. The calibration test provided data used to fully document the aero-thermal flow quality in the IRT test section and to construct calibration curves for the operation of the IRT.

  3. Expedition 18 Station Development Test Objectives (STDO) Session 1

    NASA Image and Video Library

    2009-02-19

    ISS018-E-033816 (19 Feb. 2009) --- Astronaut Michael Fincke, Expedition 18 commander, removes, cleans and replaces electronic test components on a single test card using Component Repair Equipment (CRE-1) hardware in a portable glovebox facility in the Harmony node of the International Space Station. Fincke unsoldered 1 1/2 components from an integrated circuit board and re-soldered new components including an integrated circuit chip.

  4. Expedition 18 Station Development Test Objectives (STDO) Session 1

    NASA Image and Video Library

    2009-02-19

    ISS018-E-033818 (19 Feb. 2009) --- Astronaut Michael Fincke, Expedition 18 commander, removes, cleans and replaces electronic test components on a single test card using Component Repair Equipment (CRE-1) hardware in a portable glovebox facility in the Harmony node of the International Space Station. Fincke unsoldered 1 1/2 components from an integrated circuit board and re-soldered new components including an integrated circuit chip.

  5. Feasibility study and verified design concept for new improved hot gas facility

    NASA Technical Reports Server (NTRS)

    1986-01-01

    The MSFC Hot Gas Facility (HGF) was fabricated in 1975 as a temporary facility to provide immediate turnaround testing to support the SRB and ET TPS development. This facility proved to be very useful and was used to make more than 1300 runs, far more than ever intended in the original design. Therefore, it was in need of constant repair and needed to be replaced with a new improved design to support the continuing SRB/ET TPS product improvement and/or removal efforts. MSFC contracted with Lockheed-Huntsville to work on this improved design through contract NAS8-36304 Feasibility Study and Verified Design Concept for the New Improved Hot Gas Facility. The results of Lockheed-Huntsville's efforts under this contract are summarized.

  6. Scale Model Icing Research Tunnel

    NASA Technical Reports Server (NTRS)

    Canacci, Victor A.

    1997-01-01

    NASA Lewis Research Center's Icing Research Tunnel (IRT) is the world's largest refrigerated wind tunnel and one of only three icing wind tunnel facilities in the United States. The IRT was constructed in the 1940's and has been operated continually since it was built. In this facility, natural icing conditions are duplicated to test the effects of inflight icing on actual aircraft components as well as on models of airplanes and helicopters. IRT tests have been used successfully to reduce flight test hours for the certification of ice-detection instrumentation and ice protection systems. To ensure that the IRT will remain the world's premier icing facility well into the next century, Lewis is making some renovations and is planning others. These improvements include modernizing the control room, replacing the fan blades with new ones to increase the test section maximum velocity to 430 mph, installing new spray bars to increase the size and uniformity of the artificial icing cloud, and replacing the facility heat exchanger. Most of the improvements will have a first-order effect on the IRT's airflow quality. To help us understand these effects and evaluate potential improvements to the flow characteristics of the IRT, we built a modular 1/10th-scale aerodynamic model of the facility. This closed-loop scale-model pilot tunnel was fabricated onsite in the various shops of Lewis' Fabrication Support Division. The tunnel's rectangular sections are composed of acrylic walls supported by an aluminum angle framework. Its turning vanes are made of tubing machined to the contour of the IRT turning vanes. The fan leg of the tunnel, which transitions from rectangular to circular and back to rectangular cross sections, is fabricated of fiberglass sections. The contraction section of the tunnel is constructed from sheet aluminum. A 12-bladed aluminum fan is coupled to a turbine powered by high-pressure air capable of driving the maximum test section velocity to 550 ft/sec (Mach 0.45). The air turbine and instrumentation are housed inside a fiberglass nacelle. Total and static pressure measurements can be taken around the loop, and velocity and flow angularity measurements can be taken with hot-wire and five-hole probes at specific locations. The Scale Model Icing Research Tunnel (SMIRT) is undergoing checkout tests to determine how its airflow characteristics compare with the IRT. Near-term uses for this scale-model tunnel include determining the aerodynamic effects of replacing the 52-yearold W-shaped heat exchanger with a flat-faced heat exchanger. SMIRT is an integral part of the improvements planned for the IRT because testing the proposed IRT improvements in a scale-model tunnel will lower costs and improve productivity.

  7. 44 CFR 206.226 - Restoration of damaged facilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... original site will be approved, except those facilities which facilitate an open space use in accordance... replacement items. (i) Library books and publications. Replacement of library books and publications is based...

  8. 44 CFR 206.226 - Restoration of damaged facilities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... original site will be approved, except those facilities which facilitate an open space use in accordance... replacement items. (i) Library books and publications. Replacement of library books and publications is based...

  9. Impulse Flashover Tests at Edgar Beauchamp High Voltage Test Facility, Dixon, California, in Support of Cutler Insulator Failure Investigation

    DTIC Science & Technology

    2006-07-01

    sites. The strength member of the safety core insulators is a fiberglass belt wrapped around pins in the end fittings. Porcelain tubes cover the belt... porcelain tube and heavily tracked the fiberglass belt but left the belt intact structurally (Figure 1). Figure 1. Cutler safety core insulator ...fail-safe insulators . For these tests, the porcelain tube of the safety core insulator was replaced with a plastic see-through tube. The test report [5

  10. Control Room at the NACA’s Rocket Engine Test Facility

    NASA Image and Video Library

    1957-05-21

    Test engineers monitor an engine firing from the control room of the Rocket Engine Test Facility at the National Advisory Committee for Aeronautics (NACA) Lewis Flight Propulsion Laboratory. The Rocket Engine Test Facility, built in the early 1950s, had a rocket stand designed to evaluate high-energy propellants and rocket engine designs. The facility was used to study numerous different types of rocket engines including the Pratt and Whitney RL-10 engine for the Centaur rocket and Rocketdyne’s F-1 and J-2 engines for the Saturn rockets. The Rocket Engine Test Facility was built in a ravine at the far end of the laboratory because of its use of the dangerous propellants such as liquid hydrogen and liquid fluorine. The control room was located in a building 1,600 feet north of the test stand to protect the engineers running the tests. The main control and instrument consoles were centrally located in the control room and surrounded by boards controlling and monitoring the major valves, pumps, motors, and actuators. A camera system at the test stand allowed the operators to view the tests, but the researchers were reliant on data recording equipment, sensors, and other devices to provide test data. The facility’s control room was upgraded several times over the years. Programmable logic controllers replaced the electro-mechanical control devices. The new controllers were programed to operate the valves and actuators controlling the fuel, oxidant, and ignition sequence according to a predetermined time schedule.

  11. 77 FR 46767 - Plantings Associated with Eligible Facilities (RP9524.5)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-06

    ... for replacement of grass and sod associated with facilities eligible for repair and restoration. Limited instances when plantings are eligible include grass and sod replacement if it is an integral part...

  12. Improvements and Performance of the Fermilab Solenoid Test Facility

    DOE PAGES

    Orris, Darryl; Arnold, Don; Brandt, Jeffrey; ...

    2017-06-01

    Here, the Solenoid Test Facility at Fermilab was built using a large vacuum vessel for testing of conduction-cooled superconducting solenoid magnets, and was first used to determine the performance of the MICE Coupling Coil. The facility was modified recently to enable testing of solenoid magnets for the Mu2e experiment, which operate at much higher current than the Coupling Coil. One pair of low current conduction-cooled copper and NbTi leads was replaced with two pairs of 10 kA HTS leads cooled by heat exchange with liquid nitrogen and liquid helium. The new design, with additional control and monitoring capability, also providesmore » helium cooling of the superconducting magnet leads by conduction. A high current power supply with energy extraction was added, and several improvements to the quench protection and characterization system were made. Here we present details of these changes and report on performance results from a test of the Mu2e prototype Transport Solenoid (TS) module. Progress on additional improvements in preparation for production TS module testing will be presented.« less

  13. Improvements and Performance of the Fermilab Solenoid Test Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Orris, Darryl; Arnold, Don; Brandt, Jeffrey

    Here, the Solenoid Test Facility at Fermilab was built using a large vacuum vessel for testing of conduction-cooled superconducting solenoid magnets, and was first used to determine the performance of the MICE Coupling Coil. The facility was modified recently to enable testing of solenoid magnets for the Mu2e experiment, which operate at much higher current than the Coupling Coil. One pair of low current conduction-cooled copper and NbTi leads was replaced with two pairs of 10 kA HTS leads cooled by heat exchange with liquid nitrogen and liquid helium. The new design, with additional control and monitoring capability, also providesmore » helium cooling of the superconducting magnet leads by conduction. A high current power supply with energy extraction was added, and several improvements to the quench protection and characterization system were made. Here we present details of these changes and report on performance results from a test of the Mu2e prototype Transport Solenoid (TS) module. Progress on additional improvements in preparation for production TS module testing will be presented.« less

  14. Facility S 372, replacement dolphins and ramp from upper deck ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Facility S 372, replacement dolphins and ramp from upper deck of ferry boat (YFB 87). - U.S. Naval Base, Pearl Harbor, Ferry Landing Type, Halawa Landing on Ford Island, Pearl City, Honolulu County, HI

  15. Development of the Plant Growth Facility for Use in the Shuttle Middeck and Test Units for Ground-Based Experiments

    NASA Technical Reports Server (NTRS)

    Chapman, David K.; Wells, H. William

    1996-01-01

    The plant growth facility (PGF), currently under development as a Space Shuttle middeck facility for the support of research on higher plants in microgravity, is presented. The PGF provides controlled fluorescent lighting and the active control of temperature, relative humidity and CO2 concentration. These parameters are designed to be centrally controlled by a dedicated microprocessor. The status of the experiment can be displayed for onboard analysis, and will be automatically archived for post-flight analysis. The facility is designed to operate for 15 days and will provide air filtration to remove ethylene and trace organics with replaceable potassium permanganate filters. Similar ground units will be available for pre-flight experimentation.

  16. ARC-1965-A-35705

    NASA Image and Video Library

    1965-10-22

    N-222; 2 x 2ft Transonic Wind Tunnel is a closed return, variable-density tunnel equipped with an adjustable flexible-wall nozzle and a slotted test section. Airflow is produced by a two-stage, axial-flow compressor powered by four, variable-speed induction motors mounted in tandem, delivering a total of 4,000 horsepower. For conventional, steady-state testing models are generally supported on a sting. Internal, strain-gage balances are used for measuring forces and moments. This facility is also used for panel-flutter testing (one test-section wall is replaced with another containing the test specimen.

  17. Facility 596, detail of ramp from below, with replacement sheetpile ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Facility 596, detail of ramp from below, with replacement sheet-pile dolphin on right and southernmost dolphins in background. - U.S. Naval Base, Pearl Harbor, Ferry Landing Type, Halawa Landing on Ford Island, Pearl City, Honolulu County, HI

  18. Nitric-glycolic flowsheet testing for maximum hydrogen generation rate

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Martino, C. J.; Newell, J. D.; Williams, M. S.

    The Defense Waste Processing Facility (DWPF) at the Savannah River Site is developing for implementation a flowsheet with a new reductant to replace formic acid. Glycolic acid has been tested over the past several years and found to effectively replace the function of formic acid in the DWPF chemical process. The nitric-glycolic flowsheet reduces mercury, significantly lowers the chemical generation of hydrogen and ammonia, allows purge reduction in the Sludge Receipt and Adjustment Tank (SRAT), stabilizes the pH and chemistry in the SRAT and the Slurry Mix Evaporator (SME), allows for effective adjustment of the SRAT/SME rheology, and is favorablemore » with respect to melter flammability. The objective of this work was to perform DWPF Chemical Process Cell (CPC) testing at conditions that would bound the catalytic hydrogen production for the nitric-glycolic flowsheet.« less

  19. Testing of electrical equipment for a commercial grade dedication program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brown, J.L.; Srinivas, N.

    1995-10-01

    The availability of qualified safety related replacement parts for use in nuclear power plants has decreased over time. This has caused many nuclear power plants to purchase commercial grade items (CGI) and utilize the commercial grade dedication process to qualify the items for use in nuclear safety related applications. The laboratories of Technical and Engineering Services (the testing facility of Detroit Edison) have been providing testing services for verification of critical characteristics of these items. This paper presents an overview of the experience in testing electrical equipment with an emphasis on fuses.

  20. Aero-Thermal Calibration of the NASA Glenn Icing Research Tunnel (2004 and 2005 Tests)

    NASA Technical Reports Server (NTRS)

    Arrington, E. Allen; Pastor, Christine M.; Gonsalez, Jose C.; Curry, Monroe R., III

    2010-01-01

    A full aero-thermal calibration of the NASA Glenn Icing Research Tunnel was completed in 2004 following the replacement of the inlet guide vanes upstream of the tunnel drive system and improvement to the facility total temperature instrumentation. This calibration test provided data used to fully document the aero-thermal flow quality in the IRT test section and to construct calibration curves for the operation of the IRT. The 2004 test was also the first to use the 2-D RTD array, an improved total temperature calibration measurement platform.

  1. 77 FR 56877 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-14

    ... leak rate test following the replacement of the steam generators in Unit 2. The intent of post... to be publicly disclosed. The NRC posts all comment submissions at http://www.regulations.gov as well... evaluated? Response: No. There are no changes to design, no changes to operating procedures and the revised...

  2. An Electronic Pressure Profile Display system for aeronautic test facilities

    NASA Technical Reports Server (NTRS)

    Woike, Mark R.

    1990-01-01

    The NASA Lewis Research Center has installed an Electronic Pressure Profile Display system. This system provides for the real-time display of pressure readings on high resolution graphics monitors. The Electronic Pressure Profile Display system will replace manometer banks currently used in aeronautic test facilities. The Electronic Pressure Profile Display system consists of an industrial type Digital Pressure Transmitter (DPI) unit which interfaces with a host computer. The host computer collects the pressure data from the DPI unit, converts it into engineering units, and displays the readings on a high resolution graphics monitor in bar graph format. Software was developed to accomplish the above tasks and also draw facility diagrams as background information on the displays. Data transfer between host computer and DPT unit is done with serial communications. Up to 64 channels are displayed with one second update time. This paper describes the system configuration, its features, and its advantages over existing systems.

  3. An electronic pressure profile display system for aeronautic test facilities

    NASA Technical Reports Server (NTRS)

    Woike, Mark R.

    1990-01-01

    The NASA Lewis Research Center has installed an Electronic Pressure Profile Display system. This system provides for the real-time display of pressure readings on high resolution graphics monitors. The Electronic Pressure Profile Display system will replace manometer banks currently used in aeronautic test facilities. The Electronic Pressure Profile Display system consists of an industrial type Digital Pressure Transmitter (DPT) unit which interfaces with a host computer. The host computer collects the pressure data from the DPT unit, converts it into engineering units, and displays the readings on a high resolution graphics monitor in bar graph format. Software was developed to accomplish the above tasks and also draw facility diagrams as background information on the displays. Data transfer between host computer and DPT unit is done with serial communications. Up to 64 channels are displayed with one second update time. This paper describes the system configuration, its features, and its advantages over existing systems.

  4. EFFLUENT TREATMENT FACILITY PEROXIDE DESTRUCTION CATALYST TESTING

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    HALGREN DL

    2008-07-30

    The 200 Area Effluent Treatment Facility (ETF) main treatment train includes the peroxide destruction module (PDM) where the hydrogen peroxide residual from the upstream ultraviolet light/hydrogen peroxide oxidation unit is destroyed. Removal of the residual peroxide is necessary to protect downstream membranes from the strong oxidizer. The main component of the PDM is two reaction vessels utilizing granular activated carbon (GAC) as the reaction media. The PDM experienced a number of operability problems, including frequent plugging, and has not been utilized since the ETF changed to groundwater as the predominant feed. The unit seemed to be underperforming in regards tomore » peroxide removal during the early periods of operation as well. It is anticipated that a functional PDM will be required for wastewater from the vitrification plant and other future streams. An alternate media or methodology needs to be identified to replace the GAC in the PDMs. This series of bench scale tests is to develop information to support an engineering study on the options for replacement of the existing GAC method for peroxide destruction at the ETF. A number of different catalysts will be compared as well as other potential methods such as strong reducing agents. The testing should lead to general conclusions on the viability of different catalysts and identify candidates for further study and evaluation.« less

  5. Commissioning and operation of the horizontal test apparatus at SNS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kim, Sang-Ho; Neustadt, Thomas S.; Howell, Matthew P.

    2015-07-01

    The Spallation Neutron Source (SNS) at Oak Ridge National Lab (ORNL) has built, commissioned and operated a Horizontal Test Apparatus (HTA) vessel in the Radiofrequency Test Facility (RFTF) test cave. It can be operated at 4.5 K using the independent Cryogenic Test Facility (CTF). The HTA is designed to be a single cavity version of an SNS cryomodule with the ability to demount and replace the cavity. It provides the functionality for testing a single dressed SNS medium or high beta Superconducting Radiofrequency (SRF) cavity. The HTA is currently being used in support of R&D for in-situ plasma processing ofmore » the cavity's inner niobium surface. The design and commissioning of the HTA at 4.5 K will be presented as well as results from operating the HTA including cool-down, warm-up and steady state operations. Results from plasma processing a warm SCRF cavity in-between cold HTA tests will also be reported.« less

  6. 76 FR 18191 - Privacy Act of 1974; System of Records

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-01

    ... action would be effective without further notice on May 2, 2011 unless comments are received which result... replace with ``DMDC 10 DoD.'' * * * * * System location: Delete entry and replace with ``Defense Manpower... facilities or using facilities interfacing with Defense Manpower Data Center Physical Access Control Systems...

  7. A Study of Selected Issues in Military Construction and Base Operating Support

    DTIC Science & Technology

    1986-12-01

    and poten- tial, of data reported annually on the readiness of Navy shore base facilities * Development of a statistical model for forecasting the...of replacing or modernizing existing facilities * Study of the set of activities--including retail supply operations, bachelor housing, automated data ...until data from FY 1986 can be obtained and I SECTION 2 CAPITAL FACILITIES : AGING, REPLACEMENT, AND CHANGE OVER TIME During development of the POM, OP

  8. Multistate Outbreak of Salmonella Virchow Infections Linked to a Powdered Meal Replacement Product - United States, 2015-2016.

    PubMed

    Gambino-Shirley, Kelly J; Tesfai, Adiam; Schwensohn, Colin A; Burnett, Cindy; Smith, Lori; Wagner, Jennifer M; Eikmeier, Dana; Smith, Kirk; Stone, Jolianne P; Updike, Dawn; Hines, Jonas; Shade, Lauren N; Tolar, Beth; Fu, Tong-Jen; Viazis, Stelios; Seelman, Sharon L; Blackshear, Kathryn; Wise, Matthew E; Neil, Karen P

    2018-03-07

    Nontyphoidal Salmonella is the leading cause of bacterial gastroenteritis in the United States. Meal replacement products containing raw and 'superfood' ingredients have gained increasing popularity among consumers in recent years. In January 2016, we investigated a multistate outbreak of infections with a novel strain of Salmonella Virchow. Cases were defined using molecular subtyping procedures. Commonly reported exposures were compared with responses from healthy people interviewed in the 2006-2007 FoodNet Population Survey. Firm inspections and product traceback and testing were performed. Thirty-five cases from 24 states were identified; 6 hospitalizations and no deaths were reported. Thirty-one (94%) of 33 ill people interviewed reported consuming a powdered supplement in the week before illness; of these, 30 (97%) reported consuming Product A, a raw organic powdered shake product consumed as a meal replacement. Laboratory testing isolated the outbreak strain of Salmonella Virchow from: leftover Product A collected from ill people's homes, organic moringa leaf powder (an ingredient in Product A), and finished product retained by the firm. Firm inspections at three facilities linked to Product A production did not reveal contamination at the facilities. Traceback identified that the contaminated moringa leaf powder was imported from South Africa. This investigation identified a novel outbreak vehicle and highlighted the potential risk with similar products not intended to be cooked by consumers before consuming. The company issued a voluntary recall of all implicated products. As this product has a long shelf-life, the recall likely prevented additional illnesses.

  9. KSC-00pp0503

    NASA Image and Video Library

    2000-04-14

    Center Director Roy Bridges (left) dons protective apron, gloves and face shield before the "ribbon-breaking" to open the new Cryogenic Testbed Facility. Part of the normal ceremonial ribbon was replaced with plastic tubing and frozen in liquid nitrogen for the event. Bridges hit the tubing with a small hammer to break it. The Cryogenics Testbed was built to provide cryogenics engineering development and testing services to meet the needs of industry. It will also support commercial, government and academic customers for technology development initiatives on the field of cryogenics. The facility is jointly managed by NASA and Dynacs Engineering Co. , NASA/SC's Engineering Development contractor

  10. KSC-00pp0505

    NASA Image and Video Library

    2000-04-14

    A shower of frozen plastic signifies the successful breaking of the ceremonial "ribbon" at the opening of the new Cryogenic Testbed Facility. Part of the normal ribbon was replaced with plastic tubing and frozen in liquid nitrogen for the event. Bridges hit the tubing with a small hammer to break it. The Cryogenics Testbed was built to provide cryogenics engineering development and testing services to meet the needs of industry. It will also support commercial, government and academic customers for technology development initiatives on the field of cryogenics. The facility is jointly managed by NASA and Dynacs Engineering Co. , NASA/SC's Engineering Development contractor

  11. KSC-00pp0506

    NASA Image and Video Library

    2000-04-14

    Center Director Roy Bridges (center) is congratulated for the successful breaking of the ceremonial "ribbon" and the opening of the new Cryogenic Testbed Facility. Part of the normal ribbon was replaced with plastic tubing and frozen in liquid nitrogen for the event. Bridges hit the tubing with a small hammer to break it. The Cryogenics Testbed was built to provide cryogenics engineering development and testing services to meet the needs of industry. It will also support commercial, government and academic customers for technology development initiatives on the field of cryogenics. The facility is jointly managed by NASA and Dynacs Engineering Co. , NASA/SC's Engineering Development contractor

  12. STS-86 Mission Specialist Wolf at SLF for TCDT

    NASA Technical Reports Server (NTRS)

    1997-01-01

    STS-86 Mission Specialist David A. Wolf arrives in a T-38 jet at KSCs Shuttle Landing Facility for the Terminal Countdown Demonstration Test (TCDT), a dress rehearsal for launch. STS-86 will be the seventh docking of the Space Shuttle with the Russian Space Station Mir. During the mission, Wolf will transfer to the Mir 24 crew, replacing astronaut C. Michael Foale, who will return to Earth with the rest of the STS-86 crew. Wolf is scheduled to remain on the Mir until his replacement arrives on the STS-89 mission in January. STS-86 is targeted for a Sept. 25 launch aboard the Space Shuttle Atlantis.

  13. 77 FR 56817 - Notice of Public Hearings for the Draft Environmental Impact Statement for Medical Facilities...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-14

    ... buildings (Buildings 2, 4, 6, 7, and 8) and construction of a single 5-story replacement facility in the... clinics; incorporate evidence-based design; include expansion of technology; and allow for operational... regulation. 2. MFD--demolition of five hospital buildings, construction of a single 5-story replacement...

  14. Conceptual design of 100 TW solid state laser system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McMordie, J.A.

    1995-12-31

    Currently the main solid state laser facilities used for plasma physics research in the United Kingdom are the VULCAN laser at the Rutherford Appleton Laboratory and the HELEN facility at the Atomic Weapons Establishment. In the future it is proposed to replace HELEN with a new 100 TW facility to come on line early in the next century. A brief review is given of the VULCAN and HELEN. Then the authors discuss the design for the HELEN replacement.

  15. Efficient rehabilitation care for joint replacement patients: skilled nursing facility or inpatient rehabilitation facility?

    PubMed

    Tian, Wenqiang; DeJong, Gerben; Horn, Susan D; Putman, Koen; Hsieh, Ching-Hui; DaVanzo, Joan E

    2012-01-01

    There has been lengthy debate as to which setting, skilled nursing facility (SNF) or inpatient rehabilitation facility (IRF), is more efficient in treating joint replacement patients. This study aims to determine the efficiency of rehabilitation care provided by SNF and IRF to joint replacement patients with respect to both payment and length of stay (LOS). This study used a prospective multisite observational cohort design. Tobit models were used to examine the association between setting of care and efficiency. The study enrolled 948 knee replacement patients and 618 hip replacement patients from 11 IRFs and 7 SNFs between February 2006 and February 2007. Output was measured by motor functional independence measure (FIM) score at discharge. Efficiency was measured in 3 ways: payment efficiency, LOS efficiency, and stochastic frontier analysis efficiency. IRF patients incurred higher expenditures per case but also achieved larger motor FIM gains in shorter LOS than did SNF patients. Setting of care was not a strong predictor of overall efficiency of rehabilitation care. Great variation in characteristics existed within IRFs or SNFs and severity groups. Medium-volume facilities among both SNFs and IRFs were most efficient. Early rehabilitation was consistently predictive of efficient treatment. The advantage of either setting is not clear-cut. Definition of efficiency depends in part on preference between cost and time. SNFs are more payment efficient; IRFs are more LOS efficient. Variation within SNFs and IRFs blurred setting differences; a simple comparison between SNF and IRF may not be appropriate.

  16. Replacement Technologies for Precision Cleaning of Aerospace Hardware for Propellant Service

    NASA Technical Reports Server (NTRS)

    Beeson, Harold; Kirsch, Mike; Hornung, Steven; Biesinger, Paul

    1997-01-01

    The NASA White Sands Test Facility (WSTF) is developing cleaning and verification processes to replace currently used chlorofluorocarbon-l13- (CFC-113-) based processes. The processes being evaluated include both aqueous- and solvent-based techniques. Replacement technologies are being investigated for aerospace hardware and for gauges and instrumentation. This paper includes the findings of investigations of aqueous cleaning and verification of aerospace hardware using known contaminants, such as hydraulic fluid and commonly used oils. The results correlate nonvolatile residue with CFC 113. The studies also include enhancements to aqueous sampling for organic and particulate contamination. Although aqueous alternatives have been identified for several processes, a need still exists for nonaqueous solvent cleaning, such as the cleaning and cleanliness verification of gauges used for oxygen service. The cleaning effectiveness of tetrachloroethylene (PCE), trichloroethylene (TCE), ethanol, hydrochlorofluorocarbon 225 (HCFC 225), HCFC 141b, HFE 7100(R), and Vertrel MCA(R) was evaluated using aerospace gauges and precision instruments and then compared to the cleaning effectiveness of CFC 113. Solvents considered for use in oxygen systems were also tested for oxygen compatibility using high-pressure oxygen autogenous ignition and liquid oxygen mechanical impact testing.

  17. An Assessment of Capital Budgeting Practices for Public Higher Education

    ERIC Educational Resources Information Center

    Manns, Derrick

    2004-01-01

    The capital renewal and replacement of the nation's public higher education facilities has been a growing problem for several decades. While the need for new and improved facilities has increased over the years, many campuses simply have too many aging infrastructures that are too costly to replace. This, at a time when we have less than …

  18. 18 CFR Appendix A to Part 2 - Guidance for Determining the Acceptable Construction Area for Auxiliary and Replacement Facilities

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Guidance for Determining the Acceptable Construction Area for Auxiliary and Replacement Facilities A Appendix A to Part 2 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY GENERAL...

  19. Analysis of rehabilitation activities within skilled nursing and inpatient rehabilitation facilities after hip replacement for acute hip fracture.

    PubMed

    Munin, Michael C; Putman, Koen; Hsieh, Ching-Hui; Smout, Randall J; Tian, Wenqiang; DeJong, Gerben; Horn, Susan D

    2010-07-01

    To characterize rehabilitation services in two types of postacute facilities in patients who underwent hip replacement following a hip fracture. Multisite prospective observational cohort from 6 freestanding skilled nursing facilities and 11 inpatient rehabilitation facilities. Patients (n = 218) with hip fracture who had either hemiarthroplasty or total hip arthroplasty followed by rehabilitation at skilled nursing facilities or inpatient rehabilitation facilities were enrolled. Using a point-of-care methodology, we recorded data from actual physical therapy and occupational therapy sessions completed including functional outcomes during the postacute admission. Onset time from surgical repair to rehabilitation admission was not significantly different between sites. Average skilled nursing facilities length of stay was 24.7 +/- 13.6 days, whereas inpatient rehabilitation facilities was 13.0 +/- 5.7 days (P < 0.01). Total hours of physical therapy and occupational therapy services per patient day were 1.2 in skilled nursing facilities and 2.0 in inpatient rehabilitation facilities. For weekdays only, these data changed to 1.6 in skilled nursing facilities and 2.6 hrs per patient in inpatient rehabilitation facilities (P < 0.01). Patients in inpatient rehabilitation facilities accrued more time for gait training and exercise in physical therapy, which was found to be 48% and 40% greater, respectively, through day 8. In occupational therapy, patients of inpatient rehabilitation facilities had more time allocated to lower body dressing and transfers. Significant differences in rehabilitation activities were observed, and intensity was notably different within the first 8 therapy days even though baseline demographics and medical complexity were comparable across facility types. Our data suggest that after more complex hip replacement surgery, hip fracture patients can tolerate more intensive therapy earlier within the rehabilitation program.

  20. Testing of the 3M Company Composite Conductor

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stovall, John P; Rizy, D Tom; Kisner, Roger A

    2010-10-01

    The 3M Company has developed a high-temperature low-sag conductor referred to as Aluminum-Conductor Composite-Reinforced or ACCR. The conductor uses an aluminum metal matrix material to replace the steel in conventional conductors. The objective of this work is to accelerate the commercial acceptance by electric utilities of this new conductor design by testing four representative conductor classes in controlled conditions. A unique facility called the Powerline Conductor Accelerated Testing (PCAT) Facility was built at ORNL for testing overhead conductors. The PCAT has been uniquely designed for testing overhead bare transmission line conductors at high currents and temperatures after they have beenmore » installed and tensioned to the manufacturer's specifications. The ability to operate a transmission line conductor in this manner does not exist elsewhere in the United States. Four classes of ACCR cable designed by the 3M Company have been successfully test at ORNL small, medium, large and small/compact. Based on these and other manufacturer tests, the 3M Company has successfully introduced the ACCR into the commercial market and has completed over twenty installations for utility companies.« less

  1. Trade study comparing specimen chamber servicing methods for the Space Station Centrifuge Facility

    NASA Technical Reports Server (NTRS)

    Calvisi, Michael L.; Sun, Sidney C.

    1991-01-01

    The Specimen Chamber Service Unit, a component of the Space Station Centrifuge Facility, must provide a clean enclosure on a continuing basis for the facility's plant, rodent and primate specimens. The specimen chambers can become soiled and can require periodic servicing to maintain a clean environment for the specimens. Two methods of servicing the specimen chambers are discussed: washing the chambers with an on-board washer, or disposing of the soiled chambers and replacing them with clean ones. Many of these issues are addressed by developing several servicing options, using either cleaning or replacement as the method of providing clean specimen chambers, and then evaluating each option according to a set of established quantitative and qualitative criteria. Disposing and replacing the Specimen Chambers is preferable to washing them.

  2. Experience with Designing and Implementing a Bundled Payment Program for Total Hip Replacement

    PubMed Central

    Whitcomb, Winthrop F.; Lagu, Tara; Krushell, Robert J.; Lehman, Andrew P.; Greenbaum, Jordan; McGirr, Joan; Pekow, Penelope S.; Calcasola, Stephanie; Benjamin, Evan; Mayforth, Janice; Lindenauer, Peter K.

    2015-01-01

    Background Bundled payments, also known as episode-based payments, are intended to contain health care costs and promote quality. In 2011 a bundled payment pilot program for total hip replacement was implemented by an integrated health care delivery system in conjunction with a commercial health plan subsidiary. In July 2015 the Centers for Medicare & Medicaid Services (CMS) proposed the Comprehensive Care for Joint Replacement Model to test bundled payment for hip and knee replacement. Methods Stakeholders were identified and a structure for program development and implementation was created. An Oversight Committee provided governance over a Clinical Model Subgroup and a Financial Model Subgroup. Results The pilot program included (1) a clinical model of care encompassing the period from the preoperative evaluation through the third postoperative visit, (2) a pricing model, (3) a program to share savings, and (4) a patient engagement and expectation strategy. Compared to 32 historical controls— patients treated before bundle implementation—45 post-bundle-implementation patients with total hip replacement had a similar length of hospital stay (3.0 versus 3.4 days, p = .24), higher rates of discharge to home or home with services than to a rehabilitation facility (87% versus 63%), similar adjusted median total payments ($22,272 versus $22,567, p = .43), and lower median posthospital payments ($704 versus $1,121, p = .002), and were more likely to receive guideline-consistent care (99% versus 95%, p = .05). Discussion The bundled payment pilot program was associated with similar total costs, decreased posthospital costs, fewer discharges to rehabilitation facilities, and improved quality. Successful implementation of the program hinged on buy-in from stakeholders and close collaboration between stakeholders and the clinical and financial teams. PMID:26289235

  3. Experience with Designing and Implementing a Bundled Payment Program for Total Hip Replacement.

    PubMed

    Whitcomb, Winthrop F; Lagu, Tara; Krushell, Robert J; Lehman, Andrew P; Greenbaum, Jordan; McGirr, Joan; Pekow, Penelope S; Calcasola, Stephanie; Benjamin, Evan; Mayforth, Janice; Lindenauer, Peter K

    2015-09-01

    Bundled payments, also known as episode-based payments, are intended to contain health care costs and promote quality. In 2011 a bundled payment pilot program for total hip replacement was implemented by an integrated health care delivery system in conjunction with a commercial health plan subsidiary. In July 2015 the Centers for Medicare & Medicaid Services (CMS) proposed the Comprehensive Care for Joint Replacement Model to test bundled payment for hip and knee replacement. Stakeholders were identified and a structure for program development and implementation was created. An Oversight Committee provided governance over a Clinical Model Subgroup and a Financial Model Subgroup. The pilot program included (1) a clinical model of care encompassing the period from the preoperative evaluation through the third postoperative visit, (2) a pricing model, (3) a program to share savings, and (4) a patient engagement and expectation strategy. Compared to 32 historical controls-patients treated before bundle implementation-45 post-bundle-implementation patients with total hip replacement had a similar length of hospital stay (3.0 versus 3.4 days, p=.24), higher rates of discharge to home or home with services than to a rehabilitation facility (87% versus 63%), similar adjusted median total payments ($22,272 versus $22,567, p=.43), and lower median posthospital payments ($704 versus $1,121, p=.002), and were more likely to receive guideline-consistent care (99% versus 95%, p=.05). The bundled payment pilot program was associated with similar total costs, decreased posthospital costs, fewer discharges to rehabilitation facilities, and improved quality. Successful implementation of the program hinged on buy-in from stakeholders and close collaboration between stakeholders and the clinical and financial teams.

  4. 18 CFR 2.55 - Definition of terms used in section 7(c).

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... transmission facilities, then no notification is required; (ii) On, or at the same time as, certificated... at the same time as facilities that are proposed, then the auxiliary facilities must be described in... through the facilities; (ii) The replacement facilities will have a substantially equivalent designed...

  5. 18 CFR 2.55 - Definition of terms used in section 7(c).

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... transmission facilities, then no notification is required; (ii) On, or at the same time as, certificated... at the same time as facilities that are proposed, then the auxiliary facilities must be described in... through the facilities; (ii) The replacement facilities will have a substantially equivalent designed...

  6. 18 CFR 2.55 - Definition of terms used in section 7(c).

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... transmission facilities, then no notification is required; (ii) On, or at the same time as, certificated... at the same time as facilities that are proposed, then the auxiliary facilities must be described in... through the facilities; (ii) The replacement facilities will have a substantially equivalent designed...

  7. Prefetching Simulation Objects in a Persistent Simulation Environment

    DTIC Science & Technology

    1989-11-01

    i th to montrminte DBMS, POSTGRES [Stonebraker and Rowe 1985). In our parameters (described in section 5) to help determine theimlementatio P o f E...erpaed P Rowe w9.ith our amount of speedup we can attain. Nonetheless, factors suchimplementation of PSE, we replaced POSTGRES with our own file...tihe sophisti- a uniprocessor system, and therefore we would like to even- cated DBMS facilities offered by POSTGRES . tually test prefetching

  8. A Study of the Staffing Requirements for the Replacement Hospital, National Naval Medical Center, Bethesda, Maryland

    DTIC Science & Technology

    1980-08-01

    individual services. Furthermore, while historical workload statistics for the facility as a whole are available, individual services’ workload...the linear production function statistically fitted to workload data associated with these areas in order to determine the numbers of different...scheduled replacement hospital, this study was conducted to reveal that regardless of increased facility efficiency design, current manpower

  9. International Space Station Lithium-Ion Main Battery Thermal Runaway Propagation Test

    NASA Technical Reports Server (NTRS)

    Dalton, Penni J.; North, Tim

    2017-01-01

    In 2010, the ISS Program began the development of Lithium-Ion (Li-Ion) batteries to replace the aging Ni-H2 batteries on the primary Electric Power System (EPS). After the Boeing 787 Li-Ion battery fires, the NASA Engineering and Safety Center (NESC) Power Technical Discipline Team was tasked by ISS to investigate the possibility of Thermal Runaway Propagation (TRP) in all Li-Ion batteries used on the ISS. As part of that investigation, NESC funded a TRP test of an ISS EPS non-flight Li-Ion battery. The test was performed at NASA White Sands Test Facility in October 2016. This paper will discuss the work leading up to the test, the design of the test article, and the test results.

  10. Infrared Heater Used in Qualification Testing of International Space Station Radiators

    NASA Technical Reports Server (NTRS)

    Ziemke, Robert A.

    2004-01-01

    Two heat rejection radiator systems for the International Space Station (ISS) have undergone thermal vacuum qualification testing at the NASA Glenn Research Center (GRC), Plum Brook Station, Sandusky, Ohio. The testing was performed in the Space Power Facility (SPF), the largest thermal vacuum chamber in the world. The heat rejection system radiator was tested first; it removes heat from the ISS crew living quarters. The second system tested was the photovoltaic radiator (PVR), which rejects heat from the ISS photovoltaic arrays and the electrical power-conditioning equipment. The testing included thermal cycling, hot- and cold-soaked deployments, thermal gradient deployments, verification of the onboard heater controls, and for the PVR, thermal performance tests with ammonia flow. Both radiator systems are orbital replacement units for ease of replacement on the ISS. One key to the success of these tests was the performance of the infrared heater system. It was used in conjunction with a gaseous-nitrogen-cooled cryoshroud in the SPF vacuum chamber to achieve the required thermal vacuum conditions for the qualification tests. The heater, which was designed specifically for these tests, was highly successful and easily met the test requirements. This report discusses the heating requirements, the heater design features, the design approach, and the mathematical basis of the design.

  11. The Multistage Compressor Facility

    NASA Technical Reports Server (NTRS)

    Flegel, Ashlie

    2004-01-01

    Research and developments of new aerospace technologies is one of Glenn Research Center's specialties. One facility that deals with the research of aerospace technologies is the High-speed Multistage Compressor Facility. This facility will be testing the performance and efficiency of an Ultra Efficient Engine Technology (UEET) two-stage compressor. There is a lot of preparation involved with testing something of this caliber. Before the test article can be installed into the test rig, the facility must be fully operational and ready to run. Meaning all the necessary instrumentation must be calibrated and installed in the facility. The test rig should also be in safe operating condition, and the proper safety permits obtained. In preparation for the test, the Multistage Compressor Facility went through a few changes. For instance the facility will now be utilizing slip rings, the gearbox went through some maintenance, new lubrications systems replaced the old ones, and special instrumentation needs to be fine tuned to achieve the maximum amount of accurate data. Slips rings help gather information off of a rotating device - in this case from a shaft - onto stationary contacts. The contacts (or brushes) need to be cooled to reduce the amount of frictional heat produced between the slip ring and brushes. The coolant being run through the slip ring is AK-225, a material hazardous to the ozone. To abide by the safety regulations the coolant must be run through a closed chiller system. A new chiller system was purchased but the reservoir that holds the coolant was ventilated which doesn t make the system truly closed and sealed. My task was to design and have a new reservoir built for the chiller system that complies with the safety guidelines. The gearbox had some safety issues also. Located in the back of the gearbox an inching drive was set up. When the inching drive is in use the gears and chain are bare and someone can easily get caught up in it. So to prevent anyone from getting hurt in the gears I designed a chain guard. Additional information is included in the original extended abstract.

  12. A case study of collaborative facilities use in engineering design

    NASA Astrophysics Data System (ADS)

    Monroe, Laura; Pugmire, David

    2010-01-01

    In this paper we describe the use of visualization tools and facilities in the collaborative design of a replacement weapons system, the Reliable Replacement Warhead (RRW). We used not only standard collaboration methods but also a range of visualization software and facilities to bring together domain specialists from laboratories across the country to collaborate on the design and integrate this disparate input early in the design. This was the first time in U.S. weapons history that a weapon had been designed in this collaborative manner. Benefits included projected cost savings, design improvements and increased understanding across the project.

  13. The New Anechoic Shielded Chambers Designed for Space and Commercial Applications at LIT

    NASA Technical Reports Server (NTRS)

    da Silva, Benjamim; Galvao, M. C.; Pereira, Clovis Solano

    2008-01-01

    The main objective of this paper is to present the capabilities of the new anechoic shielded rooms designed for space and commercial applications as part of the Integration and Testing Laboratory (LIT, Laboratorio de Integracao e Testes) in Brazil. A new anechoic shielded room named CBA2 has been in full operation since March 2007 and a remodeled chamber CBA1 is planned to be ready by the end of 2008, replacing an old facility which was in operation for the last 18 years. The Brazilian Space Program started with very small and simple satellites and the old CBA1 chamber was conceived in 1987 to accomplish the EMI/EMC tests not requiring significant volumes. Since the very beginning this facility was also used by the private sector for other applications mainly due to the absorption of digital electronics in all kind of products. The intense use of this facility during the last years, operating three shifts a day, caused a normal degradation and imposed several limitations. Therefore, a new totally remodeled chamber was designed considering the state of the art in terms of absorbers and associated instrumentation. On the other hand the facility CBA2 was conceived, designed and implemented to test large satellites taking into account the advance of the technology in terms of RF frequencies, power level, testing methodologies and several other factors. A very interesting and unique aspect of this project was the partnership between the private sector and governmental institution. As a result, the total investment was shared between several companies and consequently a time-sharing use of the facility as well.

  14. Application of pulsed multi-ion irradiations in radiation damage research: A stochastic cluster dynamics simulation study

    NASA Astrophysics Data System (ADS)

    Hoang, Tuan L.; Nazarov, Roman; Kang, Changwoo; Fan, Jiangyuan

    2018-07-01

    Under the multi-ion irradiation conditions present in accelerated material-testing facilities or fission/fusion nuclear reactors, the combined effects of atomic displacements with radiation products may induce complex synergies in the structural materials. However, limited access to multi-ion irradiation facilities and the lack of computational models capable of simulating the evolution of complex defects and their synergies make it difficult to understand the actual physical processes taking place in the materials under these extreme conditions. In this paper, we propose the application of pulsed single/dual-beam irradiation as replacements for the expensive steady triple-beam irradiation to study radiation damages in materials under multi-ion irradiation.

  15. Credit WCT. Photographic copy of photograph, view looking northeast down ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Credit WCT. Photographic copy of photograph, view looking northeast down onto new Dd test station from Test Stand "D" tower. Hatch of Dd test cell is open, and a test engine sits on a dolly nearby awaiting mounting. Note the water-cooled diffuser on the east end of the test chamber; this was soon replaced with a new diffuser and a steam-driven ejector for simulated high-altitude tests. A closed circuit television camera is mounted on the west end of the test cell. At the lower left of the view are fuel and oxidizer run tanks which supply propellants for test runs. (JPL negative no. 384-2650-A, 8 February 1961) - Jet Propulsion Laboratory Edwards Facility, Test Stand D, Edwards Air Force Base, Boron, Kern County, CA

  16. 49 CFR 228.101 - Distance requirement; definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... determined in accordance with rules prescribed by the Secretary of Transportation) of any area where railroad... of a new facility; (ii) Expansion of an existing facility; (iii) Placement of a mobile or modular...) Replacement of an existing facility with a new facility on the same site; or (ii) Rehabilitation or...

  17. Production Facility Prototype Blower Installation Report with 1000 Hour Test Results

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Woloshun, Keith Albert; Dale, Gregory E.; Romero, Frank Patrick

    2016-04-01

    The roots blower in use at ANL for in-beam experiments and also at LANL for flow tests was sized for 12 mm diameter disks and significantly less beam heating. Currently, the disks are 29 mm in diameter, with a 12 mm FWHM Gaussian beam spot at 42 MeV and 2.86 μA on each side of the target, 5.72 μA total. The target design itself is reported elsewhere. With the increased beam heating, the helium flow requirement increased so that a larger blower was needed for a mass flow rate of 400 g/s at 2.76 MPa (400 psig). An Aerzen GMmore » 12.4 blower was selected, and is currently being installed at the LANL facility for target and component flow testing. This report describes this blower/motor/pressure vessel package and the status of the facility preparations. The blower has been operated for 1000 hours as a preliminary investigation of long term performance, operation and possible maintenance issues. The blower performed well, with no significant change in blower head or mass flow rate developed under the operating conditions. Upon inspection, some oil had leaked out of the shaft seal of the blower. The shaft seal and bearing race have been replaced. Test results and conclusions are reported.« less

  18. Design and testing of an energy-absorbing crewseat for the F/FB-111 aircraft, volume 1

    NASA Technical Reports Server (NTRS)

    Shane, S. J.

    1985-01-01

    A program to determine if the injury potential could be reduced by replacing the existing crewseats with energy absorbing crewseats is explored. An energy-absorbing test seat was designed using much of the existing seat hardware. An extensive dynamic seat test series, designed to duplicate various crew module ground impact conditions, was conducted at a sled test facility. Comparative tests with operational F-111 crewseats were also conducted. After successful dynamic testing of the seat, more testing was conducted with the seats mounted in an F-111 crew module. Both swing tests and vertical drop tests were conducted. The vertical drop tests were used to obtain comparative data between the energy-absorbing and operational seats. Volume 1 describes the energy absorbing test seat and testing conducted, and evaluates the data from both test series.

  19. Hot-Fire Testing of 5N and 22N HPGP Thrusters

    NASA Technical Reports Server (NTRS)

    Burnside, Christopher G.; Pedersen, Kevin W.; Pierce, Charles W.

    2015-01-01

    This hot-fire test continues NASA investigation of green propellant technologies for future missions. To show the potential for green propellants to replace some hydrazine systems in future spacecraft, NASA Marshall Space Flight Center (MSFC) is continuing to embark on hot-fire test campaigns with various green propellant blends.NASA completed hot-fire testing of 5N and 22N HPGP thrusters at the Marshall Space Flight Center’s Component Development Area altitude test stand in April 2015. Both thrusters are ground test articles and not flight ready units, but are representative of potential flight hardware with a known path towards flight application. The purpose of the 5N testing was to perform facility check-outs and generate a small set of data for comparison to ECAPS and Orbital ATK data sets. The 5N thruster performed as expected with thrust and propellant flow-rate data generated that are similar to previous testing at Orbital ATK. Immediately following the 5N testing, and using the same facility, the 22N testing was conducted on the same test stand with the purpose of demonstrating the 22N performance. The results of 22N testing indicate it performed as expected.The results of the hot-fire testing are presented in this paper and presentation.

  20. TA-55 change control manual

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Blum, T.W.; Selvage, R.D.; Courtney, K.H.

    This manual is the guide for initiating change at the Plutonium Facility, which handles the processing of plutonium as well as research on plutonium metallurgy. It describes the change and work control processes employed at TA-55 to ensure that all proposed changes are properly identified, reviewed, approved, implemented, tested, and documented so that operations are maintained within the approved safety envelope. All Laboratory groups, their contractors, and subcontractors doing work at TA-55 follow requirements set forth herein. This manual applies to all new and modified processes and experiments inside the TA-55 Plutonium Facility; general plant project (GPP) and line itemmore » funded construction projects at TA-55; temporary and permanent changes that directly or indirectly affect structures, systems, or components (SSCs) as described in the safety analysis, including Facility Control System (FCS) software; and major modifications to procedures. This manual does not apply to maintenance performed on process equipment or facility SSCs or the replacement of SSCs or equipment with documented approved equivalents.« less

  1. Bag free in the Bay State.

    PubMed

    Hurwitz, Anita Gupta; Farrow, Phillip R; Preer, Genevieve; Philipp, Barbara L

    2014-06-01

    The deleterious effect of formula company-sponsored discharge bags on breastfeeding is well established. As of July 2012, all 49 maternity facilities in Massachusetts had banned these bags, making it the second "bag-free" state in the United States. Obstacles to changing this long-standing practice were numerous, including concerns regarding the cost of a substitute gift. This study was designed to describe what practices maternity facilities in Massachusetts have adopted in place of giving out a formula company-sponsored discharge bag. Maternity facilities in Massachusetts were surveyed regarding discharge gift practices. Information was collected regarding gifts given and cost. The response rate was 100%. Fifty-nine percent of the facilities replaced the formula company-sponsored bag with their own gift bag carrying the hospital's logo. Bags were either given empty or contained educational materials and/or a gift such as a T-shirt, hat, or baby book. Fourteen percent of the facilities gave a gift that did not include a bag. Twenty-seven percent of facilities gave no gift. Cost of the gifts ranged from $1 to $35, with a mean cost of $10.67. The hospital budget was used to partially or fully fund 58% of gifts; 22% were covered in part by donations. Although most maternity facilities surveyed replaced the formula company-sponsored discharge bag with a different gift, one-quarter gave no replacement. These data indicate that discontinuing discharge gifts can be a readily accepted, cost-neutral step toward evidence-based breastfeeding best practice.

  2. Aero-thermal Calibration of the NASA Glenn Icing Research Tunnel (2000 Tests)

    NASA Technical Reports Server (NTRS)

    Gonsalez, Jose C.; Arrington, E. Allen; Curry, Monroe R., III

    2001-01-01

    Aerothermal calibration measurements and flow quality surveys were made in the test section of the Icing Research Tunnel at the NASA Glenn Research Center. These surveys were made following major facility modifications including widening of the heat exchanger tunnel section, replacement of the heat exchanger, installation of new turning vanes, and installation of new fan exit guide vanes. Standard practice at NASA Glenn requires that test section calibration and flow quality surveys be performed following such major facility modifications. A single horizontally oriented rake was used to survey the flow field at several vertical positions within a single cross-sectional plane of the test section. These surveys provided a detailed mapping of the total and static pressure, total temperature, Mach number, velocity, flow angle and turbulence intensity. Data were acquired over the entire velocity and total temperature range of the facility. No icing conditions were tested; however, the effects of air sprayed through the water injecting spray bars were assessed. All data indicate good flow quality. Mach number standard deviations were less than 0.0017, flow angle standard deviations were between 0.3 deg and 0.8 deg, total temperature standard deviations were between 0.5 and 1.8 F for subfreezing conditions, axial turbulence intensities varied between 0.3 and 1.0 percent, and transverse turbulence intensities varied between 0.3 and 1.5 percent. Measurement uncertainties were also quantified.

  3. 75 FR 7472 - Southern Natural Gas Company; Notice of Intent To Prepare an Environmental Assessment for the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-19

    ... Abandonment and Replacement Project and Request for Comments on Environmental Issues February 5, 2010. The... Replacement Project, involving the abandonment and replacement of facilities by Southern Natural Gas Company... process to determine whether the project is in the public convenience and necessity. This notice announces...

  4. Recent modifications and calibration of the Langley low-turbulence pressure tunnel

    NASA Technical Reports Server (NTRS)

    Mcghee, R. J.; Beasley, W. D.; Foster, J. M.

    1984-01-01

    Modifications to the Langley Low-Turbulence Pressure Tunnel are presented and a calibration of the mean flow parameters in the test section is provided. Also included are the operational capability of the tunnel and typical test results for both single-element and multi-element airfoils. Modifications to the facility consisted of the following: replacement of the original cooling coils and antiturbulence screens and addition of a tunnel-shell heating system, a two dimensional model-support and force-balance system, a sidewall boundary layer control system, a remote-controlled survey apparatus, and a new data acquisition system. A calibration of the mean flow parameters in the test section was conducted over the complete operational range of the tunnel. The calibration included dynamic-pressure measurements, Mach number distributions, flow-angularity measurements, boundary-layer characteristics, and total-pressure profiles. In addition, test-section turbulence measurements made after the tunnel modifications have been included with these calibration data to show a comparison of existing turbulence levels with data obtained for the facility in 1941 with the original screen installation.

  5. Exploration Mission Particulate Matter Filtration Technology Performance Testing in a Simulated Spacecraft Cabin Ventilation System

    NASA Technical Reports Server (NTRS)

    Agui, Juan H.; Vijayakumar, R.; Perry, Jay L.; Frederick, Kenneth R.; Mccormick, Robert M.

    2017-01-01

    Human deep space exploration missions will require advances in long-life, low maintenance airborne particulate matter filtration technology. As one of the National Aeronautics and Space Administrations (NASA) developments in this area, a prototype of a new regenerable, multi-stage particulate matter filtration technology was tested in an International Space Station (ISS) module simulation facility. As previously reported, the key features of the filter system include inertial and media filtration with regeneration and in-place media replacement techniques. The testing facility can simulate aspects of the cabin environment aboard the ISS and contains flight-like cabin ventilation system components. The filtration technology test article was installed at the inlet of the central ventilation system duct and instrumented to provide performance data under nominal flow conditions. In-place regeneration operations were also evaluated. The real-time data included pressure drop across the filter stages, process air flow rate, ambient pressure, humidity and temperature. In addition, two video cameras positioned at the filtration technology test articles inlet and outlet were used to capture the mechanical performance of the filter media indexing operation under varying air flow rates. Recent test results are presented and future design recommendations are discussed.

  6. Facility Will Help Transition Models Into Operations

    NASA Astrophysics Data System (ADS)

    Kumar, Mohi

    2009-02-01

    The U.S. National Oceanic and Atmospheric Administration's Space Weather Prediction Center (NOAA SWPC), in partnership with the U.S. Air Force Weather Agency (AFWA), is establishing a center to promote and facilitate the transition of space weather models to operations. The new facility, called the Developmental Testbed Center (DTC), will take models used by researchers and rigorously test them to see if they can withstand continued use as viable warning systems. If a model used in a space weather warning system crashes or fails to perform well, severe consequences can result. These include increased radiation risks to astronauts and people traveling on high-altitude flights, national security vulnerabilities from the loss of military satellite communications, and the cost of replacing damaged military and commercial spacecraft.

  7. KSC-02pd0706

    NASA Image and Video Library

    2002-05-17

    KENNEDY SPACE CENTER, FLA. -- In the Orbiter Processing Facility, STS-111 Mission Specialist Philippe Perrin, with the French Space Agency, looks over the payload installed in Endeavour's payload bay. The crew is at KSC for Terminal Countdown Demonstration Test activities, which include payload familiarization and a simulated launch countdown. The crew also comprises Commander Kenneth Cockrell, Pilot Paul Lockhart and Mission Specialist Franklin Chang-Diaz. The payload on mission STS-111 to the International Space Station includes the Mobile Base System, an Orbital Replacement Unit and Multi-Purpose Logistics Module Leonardo. Traveling on Endeavour is also the Expedition 5 crew - Commander Valeri Korzun, Peggy Whitson and Sergei Treschev -- who will replace the Expedition 4 crew on the Station. Korzun and Treschev are with the Russian Space Agency. Launch of Endeavour is scheduled for May 30, 2002

  8. KSC-02pd0707

    NASA Image and Video Library

    2002-05-17

    KENNEDY SPACE CENTER, FLA. -- In the Orbiter Processing Facility, STS-111 Mission Specialists Philippe Perrin, with the French Space Agency, and Franklin Chang-Diaz pause during their checkout of the payload installed in Endeavour's payload bay. The crew is at KSC for Terminal Countdown Demonstration Test activities, which include payload familiarization and a simulated launch countdown. The crew also comprises Commander Kenneth Cockrell and Pilot Paul Lockhart. The payload on the mission to the International Space Station includes the Mobile Base System, an Orbital Replacement Unit and Multi-Purpose Logistics Module Leonardo. Traveling on Endeavour is also the Expedition 5 crew - Commander Valeri Korzun, Peggy Whitson and Sergei Treschev -- who will replace the Expedition 4 crew on the Station. Korzun and Treschev are with the Russian Space Agency. Launch of Endeavour is scheduled for May 30, 2002.

  9. New Phone System Coming to NCI Campus at Frederick | Poster

    Cancer.gov

    By Travis Fouche and Trent McKee, Guest Writers Beginning in September, phones at the NCI Campus at Frederick will begin to be replaced, as the project to upgrade the current phone system ramps up. Over the next 16 months, the Information Systems Program (ISP) will be working with Facilities Maintenance and Engineering and Computer & Statistical Services to replace the current Avaya phone system with a Cisco Unified Communications phone system. The Cisco system is already in use at the Advanced Technology Research Facility (ATRF).

  10. Design and preliminary results of a semitranspiration cooled (Lamilloy) liner for a high-pressure high-temperature combustor

    NASA Technical Reports Server (NTRS)

    Wear, J. D.; Trout, A. M.; Smith, J. M.; Jones, R. E.

    1978-01-01

    A Lamilloy combustor liner was designed, fabricated and tested in a combustor at pressures up to 8 atmospheres. The liner was fabricated of a three layer Lamilloy structure and designed to replace a conventional step louver liner. The liner is to be used in a combustor that provides hot gases to a turbine cooling test facility at pressures up to 40 atmospheres. The Lamilloy liner was tested extensively at lower pressures and demonstrated lower metal temperatures than the conventional liner, while at the same time requiring about 40 percent less cooling air flow. Tests conducted at combustor exit temperatures in excess of 2200 K have not indicated any cooling or durability problems with the Lamilloy linear.

  11. Replace or Modernize? The Future of the District of Columbia's Endangered Old and Historic Public Schools.

    ERIC Educational Resources Information Center

    Twenty-First Century School Fund, Washington, DC.

    This report addresses the decision-making process for replacing or modernizing the District of Columbia Public Schools (DCPS) as proposed in the DCPS facility master plan. The three-section document discusses old and historic schools and their future; the schools' historical and architectural value; cost of replacement and modernization; design;…

  12. 78 FR 65690 - Trees and Plantings Associated With Eligible Facilities, RP9524.5

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-01

    ...] Trees and Plantings Associated With Eligible Facilities, RP9524.5 AGENCY: Federal Emergency Management... policy Trees and Plantings Associated with Eligible Facilities. The Federal Emergency Management Agency... trees, shrubs, and other plantings, including limited eligibility for replacement of grass and sod...

  13. EPA’s Permeable Pavement Research

    EPA Science Inventory

    A deteriorated parking area on EPA’s Edison Environmental Center needed replacement. The replacement offered an opportunity for the facility managers to reduce the impervious footprint and the reduce stormwater runoff volume. This also provided researchers from the National Risk ...

  14. Production Facility Prototype Blower Installation Report with 1000 Hr Test Results

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Woloshun, Keith Albert; Olivas, Eric Richard; Dale, Gregory E.

    2016-09-23

    The roots blower in use at ANL for in-beam experiments and also at LANL for flow tests was sized for 12 mm diameter disks and significantly less beam heating. Currently, the disks are 29 mm in diameter, with a 12 mm FWHM Gaussian beam spot at 42 MeV and 2.86 μA on each side of the target, 5.72 μA total. The target design itself is reported elsewhere. With the increased beam heating, the helium flow requirement increased so that a larger blower was needed for a mass flow rate of 400 g/s at 2.76 MPa (400 psig). An Aerzen GMmore » 12.4 blower was selected, and is currently being installed at the LANL facility for target and component flow testing. This report describes this blower/motor/pressure vessel package and the status of the facility preparations. The blower has been operated for 1000 hours as a preliminary investigation of long-term performance, operation and possible maintenance issues. The blower performed well, with no significant change in blower head or mass flow rate developed under the operating conditions. Upon inspection, some oil had leaked out of the shaft seal of the blower. The shaft seal and bearing race have been replaced.« less

  15. 40 CFR Appendix A to Part 20 - Guidelines for Certification

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... that pollution control facilities must be used in connection with a plant or other property in... FACILITIES Pt. 20, App. A Appendix A to Part 20—Guidelines for Certification 1. General. 2. Air Pollution.... Air pollution control facility boundaries. c. Examples of eligibility limits. d. Replacement of...

  16. 40 CFR Appendix A to Part 20 - Guidelines for Certification

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... that pollution control facilities must be used in connection with a plant or other property in... FACILITIES Pt. 20, App. A Appendix A to Part 20—Guidelines for Certification 1. General. 2. Air Pollution.... Air pollution control facility boundaries. c. Examples of eligibility limits. d. Replacement of...

  17. 40 CFR Appendix A to Part 20 - Guidelines for Certification

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... that pollution control facilities must be used in connection with a plant or other property in... FACILITIES Pt. 20, App. A Appendix A to Part 20—Guidelines for Certification 1. General. 2. Air Pollution.... Air pollution control facility boundaries. c. Examples of eligibility limits. d. Replacement of...

  18. 40 CFR Appendix A to Part 20 - Guidelines for Certification

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... that pollution control facilities must be used in connection with a plant or other property in... FACILITIES Pt. 20, App. A Appendix A to Part 20—Guidelines for Certification 1. General. 2. Air Pollution.... Air pollution control facility boundaries. c. Examples of eligibility limits. d. Replacement of...

  19. 40 CFR Appendix A to Part 20 - Guidelines for Certification

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... that pollution control facilities must be used in connection with a plant or other property in... FACILITIES Pt. 20, App. A Appendix A to Part 20—Guidelines for Certification 1. General. 2. Air Pollution.... Air pollution control facility boundaries. c. Examples of eligibility limits. d. Replacement of...

  20. Central Computational Facility CCF communications subsystem options

    NASA Technical Reports Server (NTRS)

    Hennigan, K. B.

    1979-01-01

    A MITRE study which investigated the communication options available to support both the remaining Central Computational Facility (CCF) computer systems and the proposed U1108 replacements is presented. The facilities utilized to link the remote user terminals with the CCF were analyzed and guidelines to provide more efficient communications were established.

  1. Flow and Heat Transfer Tests in New Loop at 2757 kPa (400 psi)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Woloshun, Keith Albert

    2016-06-13

    A helium flow and heat transfer experiment has been designed for the new helium flow loop facility at LANL. This new facility is centered on an Aerzen GM 12.4 Root’s blower, selected for operation at higher pressure, up to 2757 kPa, and mass flow rate, up to 400 g/s. This replaces the previous Tuthill PD plus 3206 blower and loop limited to 2067 kPa (300 psi) and 100 g/s. The resistively heated test piece is comprised of 7 electric heaters with embedded thermocouples. The plant design for the Mo100 to Mo99 targets requires sharp bends and geometry changes in themore » helium flow tube immediately before and after the target. An idealized fully developed flow configuration with straight entry and exit will be tested and compared with an option that employs rectangular tubing to make the bend at a radius consistent with and practical for the actual plant design. The current plant design, with circular tubing and a sudden contraction to rectangular just prior to target entrance, will also be tested. This requires some modification of the test piece, as described in the report.« less

  2. Development of CFC-Free Cleaning Processes at the NASA White Sands Test Facility

    NASA Technical Reports Server (NTRS)

    Beeson, Harold; Kirsch, Mike; Hornung, Steven; Biesinger, Paul

    1995-01-01

    The NASA White Sands Test Facility (WSTF) is developing cleaning and verification processes to replace currently used chlorofluorocarbon-113- (CFC-113-) based processes. The processes being evaluated include both aqueous- and solvent-based techniques. The presentation will include the findings of investigations of aqueous cleaning and verification processes that are based on a draft of a proposed NASA Kennedy Space Center (KSC) cleaning procedure. Verification testing with known contaminants, such as hydraulic fluid and commonly used oils, established correlations between nonvolatile residue and CFC-113. Recoveries ranged from 35 to 60 percent of theoretical. WSTF is also investigating enhancements to aqueous sampling for organics and particulates. Although aqueous alternatives have been identified for several processes, a need still exists for nonaqueous solvent cleaning, such as the cleaning and cleanliness verification of gauges used for oxygen service. The cleaning effectiveness of tetrachloroethylene (PCE), trichloroethylene (TCE), ethanol, hydrochlorofluorocarbon-225 (HCFC-225), tert-butylmethylether, and n-Hexane was evaluated using aerospace gauges and precision instruments and then compared to the cleaning effectiveness of CFC-113. Solvents considered for use in oxygen systems were also tested for oxygen compatibility using high-pressure oxygen autoignition and liquid oxygen mechanical impact testing.

  3. Normetex Pump Alternatives Study

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Clark, Elliot A.

    2013-04-25

    A mainstay pump for tritium systems, the Normetex scroll pump, is currently unavailable because the Normetex company went out of business. This pump was an all-metal scroll pump that served tritium processing facilities very well. Current tritium system operators are evaluating replacement pumps for the Normetex pump and for general used in tritium service. An all-metal equivalent alternative to the Normetex pump has not yet been identified. 1. The ideal replacement tritium pump would be hermetically sealed and contain no polymer components or oils. Polymers and oils degrade over time when they contact ionizing radiation. 2. Halogenated polymers (containing fluorine,more » chlorine, or both) and oils are commonly found in pumps. These materials have many properties that surpass those of hydrocarbon-based polymers and oils, including thermal stability (higher operating temperature) and better chemical resistance. Unfortunately, they are less resistant to degradation from ionizing radiation than hydrocarbon-based materials (in general). 3. Polymers and oils can form gaseous, condensable (HF, TF), liquid, and solid species when exposed to ionizing radiation. For example, halogenated polymers form HF and HCl, which are extremely corrosive upon reaction with water. If a pump containing polymers or oils must be used in a tritium system, the system must be designed to be able to process the unwanted by-products. Design features to mitigate degradation products include filters and chemical or physical traps (eg. cold traps, oil traps). 4. Polymer components can work in tritium systems, but must be replaced regularly. Polymer components performance should be monitored or be regularly tested, and regular replacement of components should be viewed as an expected normal event. A radioactive waste stream must be established to dispose of used polymer components and oil with an approved disposal plan developed based on the facility location and its regulators. Polymers have varying resistances to ionizing radiation - aromatic polymers such as polyimide Vespel (TM) and the elastomer EPDM (ethylene propylene diene monomer) have been found to be more resistant to degradation in tritium than other polymers. This report presents information to help select replacement pumps for Normetex pumps in tritium systems. Several pumps being considered as Normetex replacement pumps are discussed.« less

  4. 'As a clinician, you are not managing lab results, you are managing the patient': how the enactment of malaria at health facilities in Cameroon compares with new WHO guidelines for the use of malaria tests.

    PubMed

    Chandler, Clare I R; Mangham, Lindsay; Njei, Abanda Ngu; Achonduh, Olivia; Mbacham, Wilfred F; Wiseman, Virginia

    2012-05-01

    In response to widespread overuse of antimalarial drugs, the World Health Organisation changed guidelines in 2010 to restrict the use of antimalarials to parasitologically confirmed malaria cases. Malaria rapid diagnostic tests (RDTs) have been presented as a means to realize the new guidelines, and National Malaria Control Programmes, including that of Cameroon, are developing plans to introduce the tests to replace microscopy or clinical diagnosis at public health facilities across the country. We aimed to understand how malaria tests and antimalarial drugs are currently used as part of social interactions between health workers and patients at public and mission health facilities in Yaoundé and Bamenda and surrounding districts in the Northwest region of Cameroon. In May to June 2010, we held 17 focus group discussions with 146 health workers involved in clinical care from 49 health facilities. Clinicians enacted malaria as a 'juggling' exercise, involving attention to pathophysiology of the patient as well as their desires and medical reputations, utilising tests and medicines for their therapeutic effects as symbols in the process of care. Parasites were rarely mentioned in describing diagnostic decisions. These enactments of malaria contrast with evidence-based guidelines emanating from WHO, which assume the parasite is the central driver of practice. If RDTs are to be taken up in practice, public health practitioners need to pay careful attention to the values and priorities of health workers and patients if they are to work with them to improve diagnosis and treatment of febrile illnesses. Copyright © 2012 Elsevier Ltd. All rights reserved.

  5. Testing a new NIF neutron time-of-flight detector with a bibenzyl scintillator on OMEGA.

    PubMed

    Glebov, V Yu; Forrest, C; Knauer, J P; Pruyne, A; Romanofsky, M; Sangster, T C; Shoup, M J; Stoeckl, C; Caggiano, J A; Carman, M L; Clancy, T J; Hatarik, R; McNaney, J; Zaitseva, N P

    2012-10-01

    A new neutron time-of-flight (nTOF) detector with a bibenzyl crystal as a scintillator has been designed and manufactured for the National Ignition Facility (NIF). This detector will replace a nTOF20-Spec detector with an oxygenated xylene scintillator currently operational on the NIF to improve the areal-density measurements. In addition to areal density, the bibenzyl detector will measure the D-D and D-T neutron yield and the ion temperature of indirect- and direct-drive-implosion experiments. The design of the bibenzyl detector and results of tests on the OMEGA Laser System are presented.

  6. Project Execution Plan for the Remote Handled Low-Level Waste Disposal Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Danny Anderson

    2014-07-01

    As part of ongoing cleanup activities at the Idaho National Laboratory (INL), closure of the Radioactive Waste Management Complex (RWMC) is proceeding under the Comprehensive Environmental Response, Compensation, and Liability Act (42 USC 9601 et seq. 1980). INL-generated radioactive waste has been disposed of at RWMC since 1952. The Subsurface Disposal Area (SDA) at RWMC accepted the bulk of INL’s contact and remote-handled low-level waste (LLW) for disposal. Disposal of contact-handled LLW and remote-handled LLW ion-exchange resins from the Advanced Test Reactor in the open pit of the SDA ceased September 30, 2008. Disposal of remote-handled LLW in concrete disposalmore » vaults at RWMC will continue until the facility is full or until it must be closed in preparation for final remediation of the SDA (approximately at the end of fiscal year FY 2017). The continuing nuclear mission of INL, associated ongoing and planned operations, and Naval spent fuel activities at the Naval Reactors Facility (NRF) require continued capability to appropriately dispose of contact and remote handled LLW. A programmatic analysis of disposal alternatives for contact and remote-handled LLW generated at INL was conducted by the INL contractor in Fiscal Year 2006; subsequent evaluations were completed in Fiscal Year 2007. The result of these analyses was a recommendation to the Department of Energy (DOE) that all contact-handled LLW generated after September 30, 2008, be disposed offsite, and that DOE proceed with a capital project to establish replacement remote-handled LLW disposal capability. An analysis of the alternatives for providing replacement remote-handled LLW disposal capability has been performed to support Critical Decision-1. The highest ranked alternative to provide this required capability has been determined to be the development of a new onsite remote-handled LLW disposal facility to replace the existing remote-handled LLW disposal vaults at the SDA. Several offsite DOE and commercial disposal options exist for contact-handled LLW; however, offsite disposal options are either not currently available (i.e., commercial disposal facilities), practical, or cost-effective for all remote-handled LLW streams generated at INL. Offsite disposal of all INL and tenant-generated remote-handled waste is further complicated by issues associated with transporting highly radioactive waste in commerce; and infrastructure and processing changes at the generating facilities, specifically NRF, that would be required to support offsite disposal. The INL Remote-Handled LLW Disposal Project will develop a new remote handled LLW disposal facility to meet mission-critical, remote-handled LLW disposal needs. A formal DOE decision to proceed with the project has been made in accordance with the requirements of National Environmental Policy Act (42 USC§ 4321 et seq.). Remote-handled LLW is generated from nuclear programs conducted at INL, including spent nuclear fuel handling and operations at NRF and operations at the Advanced Test Reactor. Remote-handled LLW also will be generated by new INL programs and from segregation and treatment (as necessary) of remote handled scrap and waste currently stored in the Radioactive Scrap and Waste Facility at the Materials and Fuels Complex.« less

  7. 23 CFR 771.118 - FTA categorical exclusions

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ...) Acquisition, installation, operation, evaluation, replacement, and improvement of discrete utilities and... activities; rehabilitation of public transportation buildings, structures, or facilities; retrofitting for... transportation vehicles, facilities or structures, or upgrading to current standards. (6) Acquisition or transfer...

  8. 23 CFR 771.118 - FTA categorical exclusions

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ...) Acquisition, installation, operation, evaluation, replacement, and improvement of discrete utilities and... activities; rehabilitation of public transportation buildings, structures, or facilities; retrofitting for... transportation vehicles, facilities or structures, or upgrading to current standards. (6) Acquisition or transfer...

  9. Modifications to Marshall's Annular Seal Test (MAST) Rig and Facility for Improved Rotordynamic Coefficient Testing of Annular Seals and Fluid Film Bearings

    NASA Technical Reports Server (NTRS)

    Darden, J. M.; Earhart, E. M.

    2011-01-01

    The limits of rotordynamic stability continue to be pushed by the high power densities and rotational speeds of modern rocket engine turbomachinery. Destabilizing forces increase dramatically with rotor speed. Rotordynamic stability is lost when these destabilizing forces overwhelm the stabilizing forces. The vibration from the unstable rotor grows until it is limited by some nonlinearity. For example, a rolling element bearing with a stiffness characteristic that increases with deflection may limit the vibration amplitude. The loads and deflections resulting from this limit cycle vibration (LCV) can lead to bearing and seal damage which promotes ever increasing levels of subsynchronous vibration. Engineers combat LCV by introducing rotordynamic elements that generate increased stabilizing forces and reduced destabilizing forces. For example, replacing a labyrinth seal with a damping seal results in substantial increases in the damping and stiffness rotordynamic coefficients. Adding a swirl brake to the damping seal greatly reduces the destabilizing cross-coupled forces generated by the damping seal for even further increases in the stabilizing capacity. Marshall?s Annular Seal Test (MAST) rig is designed to experimentally measure the stabilizing capacity of new annular seal designs. The rig has been moved to a new facility and outfitted with a new slave bearing to allow increased test durations and to enable the testing of fluid film bearings. The purpose of this paper is to describe the new facility and the new bearing arrangement. Several novel seal and bearing designs will also be discussed.

  10. 44 CFR 206.342 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... the relative cost of repairing the damaged facility to the replacement cost of that portion of the... improvement of a structure or facility, that has been damaged in excess of, or the cost of which equals or exceeds, 50 percent of the market value of the structure or placement cost of the facility (including all...

  11. Aqueous Cleaning and Validation for Space Shuttle Propulsion Hardware at the White Sands Test Facility

    NASA Technical Reports Server (NTRS)

    Hornung, Steven D.; Biesinger, Paul; Kirsch, Mike; Beeson, Harold; Leuders, Kathy

    1999-01-01

    The NASA White Sands Test Facility (WSTF) has developed an entirely aqueous final cleaning and verification process to replace the current chlorofluorocarbon (CFC) 113 based process. This process has been accepted for final cleaning and cleanliness verification of WSTF ground support equipment. The aqueous process relies on ultrapure water at 50 C (323 K) and ultrasonic agitation for removal of organic compounds and particulate. The cleanliness is verified bv determining the total organic carbon (TOC) content and filtration with particulate counting. The effectiveness of the aqueous methods for detecting hydrocarbon contamination and particulate was compared to the accepted CFC 113 sampling procedures. Testing with known contaminants, such as hydraulic fluid and cutting and lubricating oils, to establish a correlation between aqueous TOC and CFC 113 nonvolatile residue (NVR) was performed. Particulate sampling on cleaned batches of hardware that were randomly separated and sampled by the two methods was performed. This paper presents the approach and results, and discusses the issues in establishing the equivalence of aqueous sampling to CFC 113 sampling, while describing the approach for implementing aqueous techniques on Space Shuttle Propulsion hardware.

  12. Biotechnology Facility: An ISS Microgravity Research Facility

    NASA Technical Reports Server (NTRS)

    Gonda, Steve R.; Tsao, Yow-Min

    2000-01-01

    The International Space Station (ISS) will support several facilities dedicated to scientific research. One such facility, the Biotechnology Facility (BTF), is sponsored by the Microgravity Sciences and Applications Division (MSAD) and developed at NASA's Johnson Space Center. The BTF is scheduled for delivery to the ISS via Space Shuttle in April 2005. The purpose of the BTF is to provide: (1) the support structure and integration capabilities for the individual modules in which biotechnology experiments will be performed, (2) the capability for human-tended, repetitive, long-duration biotechnology experiments, and (3) opportunities to perform repetitive experiments in a short period by allowing continuous access to microgravity. The MSAD has identified cell culture and tissue engineering, protein crystal growth, and fundamentals of biotechnology as areas that contain promising opportunities for significant advancements through low-gravity experiments. The focus of this coordinated ground- and space-based research program is the use of the low-gravity environment of space to conduct fundamental investigations leading to major advances in the understanding of basic and applied biotechnology. Results from planned investigations can be used in applications ranging from rational drug design and testing, cancer diagnosis and treatments and tissue engineering leading to replacement tissues.

  13. Increase in Lead Concentration in the Drinking Water of an Animal Care Facility.

    PubMed

    Davidowitz, Bradley; Boehm, Kirk; Banovetz, Sandra; Binkley, Neil

    1998-01-01

    We report here the unexpected detection, and subsequent correction, of a problem that resulted in an increase in lead concentration in the drinking water of an animal research facility. At the initiation of a study, analysis of a water sample obtained from the drinking spout of an animal cage revealed a lead concentration nearly twice the Environmental Protection Agency's maximum acceptable concentration. Because the municipal water supply routinely had been tested and found to be free of lead, it was assumed that this contamination was within the animal care facility. It was hypothesized that the brass fitting connecting the drinking spout to a polyvinyl chloride (PVC) pipe was the source of contamination. Water samples were obtained hourly from 0700 to 1600 hours before and after replacement of the brass fitting with a PVC fitting. After this change, lead concentrations in all samples were within acceptable limits. Although blood lead concentrations were undetectable in 47 rhesus monkeys (Macaca mulatta) housed in the facility, subclinical lead toxicosis could have resulted and potentially complicated studies in which these monkeys were used. We recommend that the water supply of research facilities be monitored periodically.

  14. Designs for surge immunity in critical electronic facilities

    NASA Technical Reports Server (NTRS)

    Roberts, Edward F., Jr.

    1991-01-01

    In recent years, Federal Aviation Administration (FAA) embarked on a program replacing older tube type electronic equipment with newer solid state equipment. This replacement program dramatically increased the susceptibility of the FAA's facilities to lightning related damages. The proposal is presented of techniques which may be employed to lessen the susceptibility of new FAA electronic facility designs to failures resulting from lightning related surges and transients as well as direct strikes. The general concept espoused is one of a consistent system approach employing both perimeter and internal protection. It compares the technique presently employed to reduce electronic noise with other techniques which reduce noise while lowering susceptibility to lightning related damage. It is anticipated that these techniques will be employed in the design of an Air Traffic Control Tower in a high isokeraunic area. This facility would be subjected to rigorous monitoring over a multi-year period to provide quantitative data hopefully supporting the advantage of this design.

  15. The Lesotho Hospital PPP experience: catalyst for integrated service delivery.

    PubMed

    Coelho, Carla Faustino; O'Farrell, Catherine Commander

    2011-01-01

    For many years, Lesotho urgently needed to replace its main public hospital, Queen Elizabeth II. The project was initially conceived as a single replacement hospital, but eventually included the design and construction of a new 425 bed public hospital and adjacent primary care clinic, the renovation and expansion of three strategically located primary care clinics in the region and the management of all facilities, equipment and delivery of all clinical services in the health network by a private operator under contract for 18 years. The project's design was influenced by the recognition that a new facility alone would not address the underlying issues in service provision. The creation of this PPP health network and the contracting mechanism has increased accountability for service quality, shifted Government to a more strategic role and may also benefit other public facilities and providers in Lesotho. The county is considering the PPP approach for other health facilities.

  16. EPA’s permeable pavement research and the Edison Environmental Center

    EPA Science Inventory

    A deteriorated parking area on EPA’s Edison Environmental Center needed replacement. The replacement offered an opportunity for the facility managers to reduce the impervious footprint and the reduce stormwater runoff volume. This also provided researchers from the National Risk ...

  17. Altitude Testing of Large Liquid Propellant Engines

    NASA Technical Reports Server (NTRS)

    Maynard, Bryon T.; Raines, Nickey G.

    2010-01-01

    The National Aeronautics and Space Administration entered a new age on January 14, 2004 with President Bush s announcement of the creation the Vision for Space Exploration that will take mankind back to the Moon and on beyond to Mars. In January, 2006, after two years of hard, dedicated labor, engineers within NASA and its contractor workforce decided that the J2X rocket, based on the heritage of the Apollo J2 engine, would be the new engine for the NASA Constellation Ares upper stage vehicle. This engine and vehicle combination would provide assured access to the International Space Station to replace that role played by the Space Shuttle and additionally, would serve as the Earth Departure Stage, to push the Crew Excursion Vehicle out of Earth Orbit and head it on a path for rendezvous with the Moon. Test as you fly, fly as you test was chosen to be the guiding philosophy and a pre-requisite for the engine design, development, test and evaluation program. An exhaustive survey of national test facility assets proved the required capability to test the J2X engine at high altitude for long durations did not exist so therefore, a high altitude/near space environment testing capability would have to be developed. After several agency concepts the A3 High Altitude Testing Facility proposal was selected by the J2X engine program on March 2, 2007 and later confirmed by a broad panel of NASA senior leadership in May 2007. This facility is to be built at NASA s John C. Stennis Space Center located near Gulfport, Mississippi. 30 plus years of Space Shuttle Main Engine development and flight certification testing makes Stennis uniquely suited to support the Vision For Space Exploration Return to the Moon. Propellant handling infrastructure, engine assembly facilities, a trained and dedicated workforce and a broad and varied technical support base will all ensure that the A3 facility will be built on time to support the schedule needs of the J2X engine and the ultimate flight of the first Ares I vehicle. The A3 facility will be able to simulate pre-ignition altitude from sea-level to 100,000 feet and maintain it up to 650 seconds. Additionally the facility will be able to accommodate initial ignition, shutdown and then restart test profiles. A3 will produce up to 5000 lbm/sec of superheated steam utilizing a Chemical Steam generation system. Two separate inline steam ejectors will be used to produce a test cell vacuum to simulate the 100,000 ft required altitude. Operational capability will ensure that the facility can start up and shutdown without producing adverse pressure gradients across the J2X nozzle. The facility will have a modern thrust measurement system for accurate determination of engine performance. The latest advances in data acquisition and control will be incorporated to measure performance parameters during hotfire testing. Provisions are being made in the initial design of the new altitude facility to allow for testing of other, larger engines and potential upper stage launch vehicles that might require vacuum start testing of the engines. The new facility at Stennis Space Center will be complete and ready for hotfire operations in late 2010.

  18. Initial Test Results from a 6 K-10 K Turbo-Brayton Cryocooler for Space Applications

    NASA Astrophysics Data System (ADS)

    Swift, W. L.; Zagarola, M. V.; Breedlove, J. J.; McCormick, J. A.; Sixsmith, H.

    2004-06-01

    In March 2002, a single-stage turbo-Brayton cryocooler was installed on the Hubble Space Telescope (HST) to re-establish cooling to the detectors in the Near Infrared Camera and Multi-Object Spectrograph (NICMOS). The system has maintained the detectors at their operating temperature near 77 K since that time. Future NASA space missions require comparable low-vibration cooling for periods of five to ten years in the 6 K-10 K temperature range. Creare is extending the NICMOS cryocooler technology to meet these lower temperatures. The primary activities address the need for smaller turbomachines. Two helium compressors for a 6 K turbo-Brayton cycle have been developed and tested in a cryogenic test facility. They have met performance goals at design speeds of about 9,500 rev/s. A miniature, dual-temperature high specific speed turboalternator has been installed in this test facility and has been used to obtain extended operational life data during low temperature cryogenic tests. A smaller, low specific speed turboalternator using advanced gas bearings is under development to replace the original dual-temperature design. This machine should provide improvements in the thermodynamic performance of the cycle. This paper presents life test results for the low temperature system and discusses the development of the smaller turboalternator.

  19. 40 CFR 35.905 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., architectural, legal, fiscal, or economic investigations or studies, surveys, designs, plans, working drawings... such works were designed and constructed. The term operation and maintenance includes replacement...” fittings designed for connection with those facilities. The facilities which convey waste water from...

  20. 40 CFR 35.905 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., architectural, legal, fiscal, or economic investigations or studies, surveys, designs, plans, working drawings... such works were designed and constructed. The term operation and maintenance includes replacement...” fittings designed for connection with those facilities. The facilities which convey waste water from...

  1. 40 CFR 35.905 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., architectural, legal, fiscal, or economic investigations or studies, surveys, designs, plans, working drawings... such works were designed and constructed. The term operation and maintenance includes replacement...” fittings designed for connection with those facilities. The facilities which convey waste water from...

  2. 40 CFR 35.905 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., architectural, legal, fiscal, or economic investigations or studies, surveys, designs, plans, working drawings... such works were designed and constructed. The term operation and maintenance includes replacement...” fittings designed for connection with those facilities. The facilities which convey waste water from...

  3. 40 CFR 35.905 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., architectural, legal, fiscal, or economic investigations or studies, surveys, designs, plans, working drawings... such works were designed and constructed. The term operation and maintenance includes replacement...” fittings designed for connection with those facilities. The facilities which convey waste water from...

  4. 78 FR 57211 - Notice of Passenger Facility Charge (PFC) Approvals and Disapprovals

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-17

    ... rehabilitation design. Taxiway/apron/fuel road pavement replacement. Taxiway/apron/fuel road pavement replacement... Description of Projects Approved for Collection and Use: Taxiway F improvements (design and construction). Drainage ditch improvements (design and construction). Apron C expansion (design and construction...

  5. 40 CFR 60.590 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... or replacement of equipment (defined in § 60.591) for the purpose of process improvement which is... in § 60.591) within a process unit is an affected facility. (b) Any affected facility under paragraph... “process unit” in § 60.590 of this subpart until the EPA takes final action to require compliance and...

  6. Secure Video Surveillance System (SVSS) for unannounced safeguards inspections.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Galdoz, Erwin G.; Pinkalla, Mark

    2010-09-01

    The Secure Video Surveillance System (SVSS) is a collaborative effort between the U.S. Department of Energy (DOE), Sandia National Laboratories (SNL), and the Brazilian-Argentine Agency for Accounting and Control of Nuclear Materials (ABACC). The joint project addresses specific requirements of redundant surveillance systems installed in two South American nuclear facilities as a tool to support unannounced inspections conducted by ABACC and the International Atomic Energy Agency (IAEA). The surveillance covers the critical time (as much as a few hours) between the notification of an inspection and the access of inspectors to the location in facility where surveillance equipment is installed.more » ABACC and the IAEA currently use the EURATOM Multiple Optical Surveillance System (EMOSS). This outdated system is no longer available or supported by the manufacturer. The current EMOSS system has met the project objective; however, the lack of available replacement parts and system support has made this system unsustainable and has increased the risk of an inoperable system. A new system that utilizes current technology and is maintainable is required to replace the aging EMOSS system. ABACC intends to replace one of the existing ABACC EMOSS systems by the Secure Video Surveillance System. SVSS utilizes commercial off-the shelf (COTS) technologies for all individual components. Sandia National Laboratories supported the system design for SVSS to meet Safeguards requirements, i.e. tamper indication, data authentication, etc. The SVSS consists of two video surveillance cameras linked securely to a data collection unit. The collection unit is capable of retaining historical surveillance data for at least three hours with picture intervals as short as 1sec. Images in .jpg format are available to inspectors using various software review tools. SNL has delivered two SVSS systems for test and evaluation at the ABACC Safeguards Laboratory. An additional 'proto-type' system remains at SNL for software and hardware testing. This paper will describe the capabilities of the new surveillance system, application and requirements, and the design approach.« less

  7. Hubble (HST) hardware is inspected in PHSF

    NASA Technical Reports Server (NTRS)

    1999-01-01

    In the Payload Hazardous Servicing Facility, part of the servicing equipment for the third Hubble Space Telescope Servicing Mission (SM-3A), STS-103, is given a black light inspection. The hardware is undergoing final testing and integration of payload elements. Mission STS-103 is a 'call-up' due to the need to replace portions of the Hubble's pointing system, the gyros, which have begun to fail. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. The scheduled launch date in October is under review.

  8. KSC-99pp1078

    NASA Image and Video Library

    1999-08-25

    In the Payload Hazardous Servicing Facility, a worker gives a black light inspection to part of the servicing equipment for the third Hubble Space Telescope Servicing Mission (SM-3A), STS-103. The hardware is undergoing final testing and integration of payload elements. Mission STS-103 is a "call-up" due to the need to replace portions of the Hubble's pointing system, the gyros, which have begun to fail. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. The scheduled launch date in October is under review

  9. KSC-99pp1079

    NASA Image and Video Library

    1999-08-25

    In the Payload Hazardous Servicing Facility, part of the servicing equipment for the third Hubble Space Telescope Servicing Mission (SM-3A), STS-103, is given a black light inspection. The hardware is undergoing final testing and integration of payload elements. Mission STS-103 is a "call-up" due to the need to replace portions of the Hubble's pointing system, the gyros, which have begun to fail. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. The scheduled launch date in October is under review

  10. KSC-02pd0674

    NASA Image and Video Library

    2002-05-15

    KENNEDY SPACE CENTER, FLA. -- The Expedition 5 and STS-111 crews pose at the Shuttle Landing Facility after their arrival to take part in Terminal Countdown Demonstration Test (TCDT) activities for launch of mission STS-111. From left, they are the Expedition Five crew -- Commander Valeri Korzun and Sergei Treschev, both of the Russian Space Agency, and Peggy Whitson -- and the STS-111 crew -- Pilot Paul Lockhart, Commander Kenneth Cockrell, and Mission Specialists Phillipe Perrin, of the French Space Agency, and Franklin Chang-Diaz. Expedition 5 will travel on Space Shuttle Endeavour to the International Space Station as a replacement crew for Expedition 4. The TCDT is a rehearsal for launch and includes emergency egress training, familiarization with payload and a simulated launch countdown. Mission STS-111 is a utilization flight that will deliver equipment and supplies to the Station. Along with the Multi-Purpose Logisitics Module Leonardo, the payload includes the Mobile Base System, part of the Canadian Mobile Servicing System, or MSS, and an Orbital Replacement Unit, the replacement wrist/roll joint for the SSRMS (Canadarm2). Launch of Endeavour is scheduled for May 30, 2002

  11. 18 CFR 157.208 - Construction, acquisition, operation, replacement, and miscellaneous rearrangement of facilities.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... applicant's existing facilities; (5) A flow diagram or comparative study showing daily design capacity... designed to meet the goal of limiting the perceived noise at NSAs to an Ldn of 55 dBA or what mitigation...

  12. 18 CFR 157.208 - Construction, acquisition, operation, replacement, and miscellaneous rearrangement of facilities.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... applicant's existing facilities; (5) A flow diagram or comparative study showing daily design capacity... designed to meet the goal of limiting the perceived noise at NSAs to an Ldn of 55 dBA or what mitigation...

  13. 18 CFR 157.208 - Construction, acquisition, operation, replacement, and miscellaneous rearrangement of facilities.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... applicant's existing facilities; (5) A flow diagram or comparative study showing daily design capacity... designed to meet the goal of limiting the perceived noise at NSAs to an Ldn of 55 dBA or what mitigation...

  14. 18 CFR 157.208 - Construction, acquisition, operation, replacement, and miscellaneous rearrangement of facilities.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... applicant's existing facilities; (5) A flow diagram or comparative study showing daily design capacity... designed to meet the goal of limiting the perceived noise at NSAs to an Ldn of 55 dBA or what mitigation...

  15. 18 CFR 157.208 - Construction, acquisition, operation, replacement, and miscellaneous rearrangement of facilities.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... applicant's existing facilities; (5) A flow diagram or comparative study showing daily design capacity... designed to meet the goal of limiting the perceived noise at NSAs to an Ldn of 55 dBA or what mitigation...

  16. 78 FR 27472 - Notice of Passenger Facility Charge (PFC) Approvals and Disapprovals

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-10

    ... Approved For Collection And Use: Airfield lighting and vault. Runway 21 extension--preliminary design...--80 facility modification design and build-out. Access control enhancements. Security fence replacement. Airfield pavement survey. Jet bridge refurbishment. Security checkpoint modification. Friction...

  17. Direct provision versus facility collection of HIV self-tests among female sex workers in Uganda: A cluster-randomized controlled health systems trial.

    PubMed

    Ortblad, Katrina; Kibuuka Musoke, Daniel; Ngabirano, Thomson; Nakitende, Aidah; Magoola, Jonathan; Kayiira, Prossy; Taasi, Geoffrey; Barresi, Leah G; Haberer, Jessica E; McConnell, Margaret A; Oldenburg, Catherine E; Bärnighausen, Till

    2017-11-01

    HIV self-testing allows HIV testing at any place and time and without health workers. HIV self-testing may thus be particularly useful for female sex workers (FSWs), who should test frequently but face stigma and financial and time barriers when accessing healthcare facilities. We conducted a cluster-randomized controlled health systems trial among FSWs in Kampala, Uganda, to measure the effect of 2 HIV self-testing delivery models on HIV testing and linkage to care outcomes. FSW peer educator groups (1 peer educator and 8 participants) were randomized to either (1) direct provision of HIV self-tests, (2) provision of coupons for free collection of HIV self-tests in a healthcare facility, or (3) standard of care HIV testing. We randomized 960 participants in 120 peer educator groups from October 18, 2016, to November 16, 2016. Participants' median age was 28 years (IQR 24-32). Our prespecified primary outcomes were self-report of any HIV testing at 1 month and at 4 months; our prespecified secondary outcomes were self-report of HIV self-test use, seeking HIV-related medical care and ART initiation. In addition, we analyzed 2 secondary outcomes that were not prespecified: self-report of repeat HIV testing-to understand the intervention effects on frequent testing-and self-reported facility-based testing-to quantify substitution effects. Participants in the direct provision arm were significantly more likely to have tested for HIV than those in the standard of care arm, both at 1 month (risk ratio [RR] 1.33, 95% CI 1.17-1.51, p < 0.001) and at 4 months (RR 1.14, 95% CI 1.07-1.22, p < 0.001). Participants in the direct provision arm were also significantly more likely to have tested for HIV than those in the facility collection arm, both at 1 month (RR 1.18, 95% CI 1.07-1.31, p = 0.001) and at 4 months (RR 1.03, 95% CI 1.01-1.05, p = 0.02). At 1 month, fewer participants in the intervention arms had sought medical care for HIV than in the standard of care arm, but these differences were not significant and were reduced in magnitude at 4 months. There were no statistically significant differences in ART initiation across study arms. At 4 months, participants in the direct provision arm were significantly more likely to have tested twice for HIV than those in the standard of care arm (RR 1.51, 95% CI 1.29-1.77, p < 0.001) and those in the facility collection arm (RR 1.22, 95% CI 1.08-1.37, p = 0.001). Participants in the HIV self-testing arms almost completely replaced facility-based testing with self-testing. Two adverse events related to HIV self-testing were reported: interpersonal violence and mental distress. Study limitations included self-reported outcomes and limited generalizability beyond FSWs in similar settings. In this study, HIV self-testing appeared to be safe and increased recent and repeat HIV testing among FSWs. We found that direct provision of HIV self-tests was significantly more effective in increasing HIV testing among FSWs than passively offering HIV self-tests for collection in healthcare facilities. HIV self-testing could play an important role in supporting HIV interventions that require frequent HIV testing, such as HIV treatment as prevention, behavior change for transmission reduction, and pre-exposure prophylaxis. ClinicalTrials.gov NCT02846402.

  18. Assessment of the National Research Universal Reactor Proposed New Stack Sampling Probe Location for Compliance with ANSI/HPS N13.1-1999

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Glissmeyer, John A.; Antonio, Ernest J.; Flaherty, Julia E.

    2016-02-29

    This document reports on a series of tests conducted to assess the proposed air sampling location for the National Research Universal reactor (NRU) complex exhaust stack, located in Chalk River, Ontario, Canada, with respect to the applicable criteria regarding the placement of an air sampling probe. Due to the age of the equipment in the existing monitoring system, and the increasing difficulty in acquiring replacement parts to maintain this equipment, a more up-to-date system is planned to replace the current effluent monitoring system, and a new monitoring location has been proposed. The new sampling probe should be located within themore » exhaust stack according to the criteria established by the American National Standards Institute/Health Physics Society (ANSI/HPS) N13.1-1999, Sampling and Monitoring Releases of Airborne Radioactive Substances from the Stack and Ducts of Nuclear Facilities. These criteria address the capability of the sampling probe to extract a sample that represents the effluent stream. The internal Pacific Northwest National Laboratory (PNNL) project for this task was 65167, Atomic Energy Canada Ltd. Chalk River Effluent Duct Flow Qualification. The testing described in this document was guided by the Test Plan: Testing of the NRU Stack Air Sampling Position (TP-STMON-032).« less

  19. Investigation of Coatings Which Prevent Molten Aluminum/Water Explosions

    NASA Astrophysics Data System (ADS)

    León, D. D.; Richter, R. T.; Levendusky, T. L.

    The Aluminum Association contracted Alcoa in 1995 to identify and test new protective coatings for casting pits as a replacement for Porter International's 7001 (Tarset Standard). Three new coatings have been identified through a series of selection criteria including: 1) A standardized splash test used to evaluate personal protective clothing, 2) An industry-standard molten metal explosion test, 3) A multiple-exposure test to measure durability, and 4) An external shock impact test. The results of this program will be reviewed. This study only tested protective coatings at the "in-service cure time", as defined by the manufacturer. These curing times can be excessive for a production casting facility. The Aluminum Association has contracted Alcoa in a second program to investigate the effect of reduced cure times on adhesion and their effectiveness in preventing molten metal/water explosions. A status update of this new two year program is provided.

  20. United States Air Force Wipe Solvent Testing

    NASA Technical Reports Server (NTRS)

    Hornung, Steven D.; Beeson, Harold D.

    2000-01-01

    The Wright-Patterson Air Force Base (WPAFB), as part of the Air Force Material Command, requested that NASA Johnson Space Center (JSC) White Sands Test Facility (WSTF) conduct testing and analyses in support of the United States Air Force Wipe Solvent Development Project. The purpose of the wipe solvent project is to develop an alternative to be used by Air Force flight line and maintenance personnel for the wipe cleaning of oxygen equipment. This report provides material compatibility, liquid oxygen (LOX) mechanical impact, autogenous ignition temperature (AIT), and gauge cleaning test data for some of the currently available solvents that may be used to replace CFC-113 and methyl chloroform. It provides data from previous WSTF test programs sponsored by the Naval Sea Systems Command, the Kennedy Space Center, and other NASA programs for the purpose of assisting WP AFB in identifying the best alternative solvents for validation testing.

  1. Mercury free microscopy: an opportunity for core facility directors.

    PubMed

    Baird, T Regan; Kaufman, Daniel; Brown, Claire M

    2014-07-01

    Mercury Free Microscopy (MFM) is a new movement that encourages microscope owners to choose modern mercury free light sources to replace more traditional mercury based arc lamps. Microscope performance is enhanced with new solid state technologies because they offer a more stable light intensity output and have a more uniform light output across the visible spectrum. Solid state sources not only eliminate mercury but also eliminate the cost of consumable bulbs (lifetime ∼200 hours), use less energy, reduce the instrument down time when bulbs fail and reduce the staff time required to replace and align bulbs. With lifetimes on the order of tens of thousands of hours, solid state replacements can pay for themselves over their lifetime with the omission of consumable, staff (no need to replace and align bulbs) and energy costs. Solid state sources are also sustainable and comply with institutional and government body mandates to reduce energy consumption, carbon footprints and hazardous waste. MFM can be used as a mechanism to access institutional financial resources for sustainable technology through a variety of stakeholders to defray the cost to microscope owners for the initial purchase of solid state sources or the replacement cost of mercury based sources. Core facility managers can take a lead in this area as "green" ambassadors for their institution by championing a local MFM program that will save their institution money and energy and eliminate mercury from the waste stream. Managers can leverage MFM to increase the visibility of their facility, their impact within the institution, and as a vital educational resource for scientific and administrative consultation.

  2. Effects of exercise on bone mineral density in calcium-replete postmenopausal women with and without hormone replacement therapy.

    PubMed

    Going, Scott; Lohman, Timothy; Houtkooper, Linda; Metcalfe, Lauve; Flint-Wagner, Hilary; Blew, Robert; Stanford, Vanessa; Cussler, Ellen; Martin, Jane; Teixeira, Pedro; Harris, Margaret; Milliken, Laura; Figueroa-Galvez, Arturo; Weber, Judith

    2003-08-01

    Osteoporosis is a major public health concern. The combination of exercise, hormone replacement therapy, and calcium supplementation may have added benefits for improving bone mineral density compared to a single intervention. To test this notion, 320 healthy, non-smoking postmenopausal women, who did or did not use hormone replacement therapy (HRT), were randomized within groups to exercise or no exercise and followed for 12 months. All women received 800 mg calcium citrate supplements daily. Women who exercised performed supervised aerobic, weight-bearing and weight-lifting exercise, three times per week in community-based exercise facilities. Regional bone mineral density (BMD) was assessed by dual energy X-ray absorptiometry. Women who used HRT, calcium, and exercised increased femoral neck, trochanteric and lumbar spine bone mineral density by approximately 1-2%. Trochanteric BMD was also significantly increased by approximately 1.0% in women who exercised and used calcium without HRT compared to a negligible change in women who used HRT and did not exercise. The results demonstrate that regional BMD can be improved with aerobic, weight-bearing activity combined with weight lifting at clinically relevant sites in postmenopausal women. The response was significant at more sites in women who used HRT, suggesting a greater benefit with hormone replacement and exercise compared to HRT alone.

  3. Simulation Facilities and Test Beds for Galileo

    NASA Astrophysics Data System (ADS)

    Schlarmann, Bernhard Kl.; Leonard, Arian

    2002-01-01

    Galileo is the European satellite navigation system, financed by the European Space Agency (ESA) and the European Commission (EC). The Galileo System, currently under definition phase, will offer seamless global coverage, providing state-of-the-art positioning and timing services. Galileo services will include a standard service targeted at mass market users, an augmented integrity service, providing integrity warnings when fault occur and Public Regulated Services (ensuring a continuity of service for the public users). Other services are under consideration (SAR and integrated communications). Galileo will be interoperable with GPS, and will be complemented by local elements that will enhance the services for specific local users. In the frame of the Galileo definition phase, several system design and simulation facilities and test beds have been defined and developed for the coming phases of the project, respectively they are currently under development. These are mainly the following tools: Galileo Mission Analysis Simulator to design the Space Segment, especially to support constellation design, deployment and replacement. Galileo Service Volume Simulator to analyse the global performance requirements based on a coverage analysis for different service levels and degrades modes. Galileo System Simulation Facility is a sophisticated end-to-end simulation tool to assess the navigation performances for a complete variety of users under different operating conditions and different modes. Galileo Signal Validation Facility to evaluate signal and message structures for Galileo. Galileo System Test Bed (Version 1) to assess and refine the Orbit Determination &Time Synchronisation and Integrity algorithms, through experiments relying on GPS space infrastructure. This paper presents an overview on the so called "G-Facilities" and describes the use of the different system design tools during the project life cycle in order to design the system with respect to availability, continuity and integrity requirements. It gives more details on two of these system design tools: the Galileo Signal Validation Facility (GSVF) and the Galileo System Simulation Facility (GSSF). It will describe the operational use of these facilities within the complete set of design tools and especially the combined use of GSVF and GSSF will be described. Finally, this paper presents also examples and results obtained with these tools.

  4. 76 FR 28222 - Extension of the Public Review and Comment Period and Announcement of an Additional Public...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-16

    ... Impact Statement for the Nuclear Facility Portion of the Chemistry and Metallurgy Research Building... Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, Los Alamos... Chemistry and Metallurgy Research Building Replacement Project (CMRR-NF) at Los Alamos National Laboratory...

  5. Handling Rapid Growth.

    ERIC Educational Resources Information Center

    Scheideman, Dale; Dufresne, Ray

    2001-01-01

    Nevada's Clark County, the fastest growing school district in the nation, uses a life-cycle facilities management approach that monitors the individual components of each building on a database. The district's 10-year building program is addressing facilities infrastructure renewal, deferred maintenance, replacement, and new school construction.…

  6. Planning for Capital Reinvestment.

    ERIC Educational Resources Information Center

    Biedenweg, Frederick; Weisburg-Swanson, Lynda; Gardner, Catherine

    1998-01-01

    Describes and evaluates four alternatives for planning and budgeting for capital reinvestment for college and university facilities: physical plant auditing; a depreciation-based approach; percentage of current replacement value; and facility subsystem modeling, or life-cycle modeling. Each has advantages and limitations in budgeting for and…

  7. Special report. New products that improve officer performance, safety.

    PubMed

    1991-12-01

    The need for products that improve performance of security officers is counterbalanced these days by budgetary constraints. While this may limit major investments in security systems and personnel, less costly improvements or innovations might be worth considering. In this report, we will discuss four advances that may be valuable not only in hospital security, but in other industries as well. One of them, a smoke filter, was originally developed for the hotel industry. Another, a drug detection device, may replace the use of undercover agents or drug-sniffing' dogs in certain circumstances. The third new product is an economical patrol vehicle for parking facilities which might replace more costly vehicles such as golf carts or cars. The fourth product, a roving CCTV camera, is actually being tested at a Midwest medical center and may allow you to monitor areas of parking garages with cameras instead of officers on patrol.

  8. Design and testing of an energy-absorbing crewseat for the F/FB-111 aircraft. Volume 3: Data from crew module testing

    NASA Technical Reports Server (NTRS)

    Shane, S. J.

    1985-01-01

    Over the past years, several papers and reports have documented the unacceptably high injury rate during the escape sequence (including the ejection and ground impact) of the crew module for F/FB-111 aircraft. This report documents a program to determine if the injury potential could be reduced by replacing the existing crewseats with energy absorbing crewseats. An energy absorbing test seat was designed using much of the existing seat hardware. An extensive dynamic seat test series, designed to duplicate various crew module ground impact conditions, was conducted at a sled test facility. Comparative tests with operational F-111 crewseats were also conducted. After successful dynamic testing of the seat, more testing was conducted with the seats mounted in an F-111 crew module. Both swing tests and vertical drop tests werre conducted. The vertical drop tests were used to obtain comparative data between the energy absorbing and operational seats.

  9. National Wind Technology Center Dynamic 5-Megawatt Dynamometer

    ScienceCinema

    Felker, Fort

    2018-06-06

    The National Wind Technology Center (NWTC) offers wind industry engineers a unique opportunity to conduct a wide range of tests. Its custom-designed dynamometers can test wind turbine systems from 1 kilowatt (kW) to 5 megawatts (MW). The NWTC's new dynamometer facility simulates operating field conditions to assess the reliability and performance of wind turbine prototypes and commercial machines, thereby reducing deployment time, failures, and maintenance or replacement costs. Funded by the U.S. Department of Energy with American Recovery and Reinvestment Act (ARRA) funds, the 5-MW dynamometer will provide the ability to test wind turbine drivetrains and connect those drivetrains directly to the electricity grid or through a controllable grid interface (CGI). The CGI tests the low-voltage ride-through capability of a drivetrain as well as its response to faults and other abnormal grid conditions.

  10. 7 CFR 1710.251 - Construction work plans-distribution borrowers.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... generation facilities; (11) Load management equipment, automatic sectionalizing facilities, and centralized... transmission plant, and improvements replacements, and retirements of any generation plant. Construction of new generation capacity need not be included in a CWP but must be specified and supported by specific engineering...

  11. Nuclear Warheads: The Reliable Replacement Warhead program and the Life Extension Program

    DTIC Science & Technology

    2007-12-03

    eliminate the need for ESD controls.”67 CRS-22 68 The Defense Nuclear Facilities Safety Board was created by Congress 1988 “as an independent oversight...public health and safety’ at DOE’s defense nuclear facilities .” U.S. Defense Nuclear Facilities Safety Board. “Who We Are,” at [http://www.dnfsb.gov...about/index.html]. 69 Personal communication, Kent Fortenberry, Technical Director, Defense Nuclear Facilities Safety Board, September 14, 2006. 70

  12. Nuclear Warheads: The Reliable Replacement Warhead Program and the Life Extension Program

    DTIC Science & Technology

    2006-12-13

    Defense Nuclear Facilities Safety Board was created by Congress 1988 "as an independent oversight organization within the Executive Branch charged... nuclear facilities ." U.S. Defense Nuclear Facilities Safety Board. “Who We Are,” at [http://www.dnfsb.gov/about/index.html]. involving CHE and plutonium...approach, if successful, would “reduce or eliminate the need for ESD controls.”42 Kent Fortenberry, Technical Director of the Defense Nuclear Facilities

  13. Nuclear Warheads: The Reliable Replacement Warhead Program and the Life Extension Program

    DTIC Science & Technology

    2007-04-04

    Information provided by Pantex Plant, Sept. 19, 2006. 50 The Defense Nuclear Facilities Safety Board was created by Congress 1988 “as an independent...protection of public health and safety’ at DOE’s defense nuclear facilities .” U.S. Defense Nuclear Facilities Safety Board. “Who We Are,” at [http...www.dnfsb.gov/about/index.html]. 51 Personal communication, Kent Fortenberry, Technical Director, Defense Nuclear Facilities Safety Board, Sept. 14, 2006

  14. Nuclear Warheads: The Reliable Replacement Warhead Program and the Life Extension Program

    DTIC Science & Technology

    2007-07-16

    The Defense Nuclear Facilities Safety Board was created by Congress 1988 “as an independent oversight organization within the Executive Branch charged... nuclear facilities .” U.S. Defense Nuclear Facilities Safety Board. “Who We Are,” at [http://www.dnfsb.gov/about/index.html]. beginning, addressed safety...approach, if successful, would “reduce or eliminate the need for ESD controls.”55 Kent Fortenberry, Technical Director of the Defense Nuclear Facilities Safety

  15. Properties of concrete blocks prepared with low grade recycled aggregates.

    PubMed

    Poon, Chi-Sun; Kou, Shi-cong; Wan, Hui-wen; Etxeberria, Miren

    2009-08-01

    Low grade recycled aggregates obtained from a construction waste sorting facility were tested to assess the feasibility of using these in the production of concrete blocks. The characteristics of the sorted construction waste are significantly different from that of crushed concrete rubbles that are mostly derived from demolition waste streams. This is due to the presence of higher percentages of non-concrete components (e.g. >10% soil, brick, tiles etc.) in the sorted construction waste. In the study reported in this paper, three series of concrete block mixtures were prepared by using the low grade recycled aggregates to replace (i) natural coarse granite (10mm), and (ii) 0, 25, 50, 75 and 100% replacement levels of crushed stone fine (crushed natural granite <5mm) in the concrete blocks. Test results on properties such as density, compressive strength, transverse strength and drying shrinkage as well as strength reduction after exposure to 800 degrees C are presented below. The results show that the soil content in the recycled fine aggregate was an important factor in affecting the properties of the blocks produced and the mechanical strength deceased with increasing low grade recycled fine aggregate content. But the higher soil content in the recycled aggregates reduced the reduction of compressive strength of the blocks after exposure to high temperature due probably to the formation of a new crystalline phase. The results show that the low grade recycled aggregates obtained from the construction waste sorting facility has potential to be used as aggregates for making non-structural pre-cast concrete blocks.

  16. A DICOM-based 2nd generation Molecular Imaging Data Grid implementing the IHE XDS-i integration profile.

    PubMed

    Lee, Jasper; Zhang, Jianguo; Park, Ryan; Dagliyan, Grant; Liu, Brent; Huang, H K

    2012-07-01

    A Molecular Imaging Data Grid (MIDG) was developed to address current informatics challenges in archival, sharing, search, and distribution of preclinical imaging studies between animal imaging facilities and investigator sites. This manuscript presents a 2nd generation MIDG replacing the Globus Toolkit with a new system architecture that implements the IHE XDS-i integration profile. Implementation and evaluation were conducted using a 3-site interdisciplinary test-bed at the University of Southern California. The 2nd generation MIDG design architecture replaces the initial design's Globus Toolkit with dedicated web services and XML-based messaging for dedicated management and delivery of multi-modality DICOM imaging datasets. The Cross-enterprise Document Sharing for Imaging (XDS-i) integration profile from the field of enterprise radiology informatics was adopted into the MIDG design because streamlined image registration, management, and distribution dataflow are likewise needed in preclinical imaging informatics systems as in enterprise PACS application. Implementation of the MIDG is demonstrated at the University of Southern California Molecular Imaging Center (MIC) and two other sites with specified hardware, software, and network bandwidth. Evaluation of the MIDG involves data upload, download, and fault-tolerance testing scenarios using multi-modality animal imaging datasets collected at the USC Molecular Imaging Center. The upload, download, and fault-tolerance tests of the MIDG were performed multiple times using 12 collected animal study datasets. Upload and download times demonstrated reproducibility and improved real-world performance. Fault-tolerance tests showed that automated failover between Grid Node Servers has minimal impact on normal download times. Building upon the 1st generation concepts and experiences, the 2nd generation MIDG system improves accessibility of disparate animal-model molecular imaging datasets to users outside a molecular imaging facility's LAN using a new architecture, dataflow, and dedicated DICOM-based management web services. Productivity and efficiency of preclinical research for translational sciences investigators has been further streamlined for multi-center study data registration, management, and distribution.

  17. 77 FR 48592 - Bus and Bus Facilities Discretionary Program Funds

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-14

    ... to award the funds for capital investments aimed at replacing or rehabilitating transit... (DOT) Federal Transit Administration (FTA) announces the selection of capital projects for the State of... Facilities Program funds. As outlined in the NOFA, the Section 5309 funds would be awarded for capital...

  18. Food Service Equipment. Third Edition.

    ERIC Educational Resources Information Center

    Jernigan, Anna Katherine; Ross, Lynne Nannen

    This book provides information that will help in purchasing the kind of food service equipment most useful in any given facility. Hence, it should be of value to architects, contractors, administrators, dietitians, managers, and others involved in remodeling a facility, replacing equipment, and/or improving the efficiency of food service…

  19. 10 CFR 170.21 - Schedule of fees for production and utilization facilities, review of standard referenced design...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., review of standard referenced design approvals, special projects, inspections and import and export... standard referenced design approvals, special projects, inspections and import and export licenses..., approvals of facility standard reference designs, re-qualification and replacement examinations for reactor...

  20. 10 CFR 170.21 - Schedule of fees for production and utilization facilities, review of standard referenced design...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ..., review of standard referenced design approvals, special projects, inspections and import and export... standard referenced design approvals, special projects, inspections and import and export licenses..., approvals of facility standard reference designs, re-qualification and replacement examinations for reactor...

  1. 10 CFR 170.21 - Schedule of fees for production and utilization facilities, review of standard referenced design...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ..., review of standard referenced design approvals, special projects, inspections and import and export... standard referenced design approvals, special projects, inspections and import and export licenses..., approvals of facility standard reference designs, re-qualification and replacement examinations for reactor...

  2. 10 CFR 170.21 - Schedule of fees for production and utilization facilities, review of standard referenced design...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ..., review of standard referenced design approvals, special projects, inspections and import and export... standard referenced design approvals, special projects, inspections and import and export licenses..., approvals of facility standard reference designs, re-qualification and replacement examinations for reactor...

  3. 78 FR 37760 - Electrical Equipment in Hazardous Locations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-24

    ... floating facilities engaged in OCS activities, however, equipment could be installed in hazardous locations... composition and the extent of equipment replacement. The myriad types of MODUs and facilities operating on the.... USCG-2012-0850] RIN 1625-AC00 Electrical Equipment in Hazardous Locations AGENCY: Coast Guard, DHS...

  4. COR1 Engineering Test Unit Measurements at the NCAR/HAO Vacuum Tunnel Facility, October-November 2002

    NASA Technical Reports Server (NTRS)

    Thompson, William

    2002-01-01

    The Engineering Test Unit (ETU) of COR1 was made in two configurations. The first configuration, ETU-1, was for vibration testing, while the second, ETU-2, was for optical testing. This is a report on the optical testing performed on ETU-2 at the NCAR/HAO Vacuum Tunnel Facility during the months of October and November, 2002. This was the same facility used to test the two previous breadboard models. In both configurations, the first two tube sections were complete, with all optical elements aligned. The vibration model ETU-1 had the remaining tube sections attached, with mass models for the remaining optics, for the various mechanisms, and for the focal plane assembly. It was then converted into the optical model ETU-2 by removing tube sections 3 to 5, and mounting the remaining optics on commercial mounts. (The bandpass filter was also installed into tube 2, which had been replaced in ETU-1 by a mass model, so that pre- and post-vibration optical measurements could be made.) Doublet 2 was installed in a Newport LP-2 carrier, and aligned to the other optics in the first two tube sections. The LP-2 adjustment screws were then uralened so that the alignment could be maintained during shipping. Because neither the flight polarizer nor Hollow Core Motor were available, they were simulated by a commercial polarizer and rotational mount, both from Oriel corporation. The Oriel rotational stage was not designed for vacuum use, but it was determined after consultation with the company, and lab testing, that the stage could be used in the moderate vacuum conditions at the NCAR/HAO facility. The shutter and focal plane assembly were simulated with the same camera used for the previous two breadboard tests. The focal plane mask was simulated with a plane of BK7 glass with a mask glued on, using the same procedure as for the Lyot spot on Doublet 1, and mounted in an adjustable LP-2 carrier. Two masks were made, one made to the precise specifications of the optical design, the other slightly bigger to make alignment easier.

  5. Hubble Space Telescope (HST) at Lockheed Facility during preflight assembly

    NASA Image and Video Library

    1988-03-31

    A mechanical arm positions the axial scientific instrument (SI) module (orbital replacement unit (ORU)) just outside the open doors of the Hubble Space Telescope (HST) Support System Module (SSM) as clean-suited technicians oversee the process. HST assembly is being completed at the Lockheed Facility in Sunnyvale, California.

  6. 75 FR 60745 - Notice of Intent To Prepare a Supplemental Environmental Impact Statement for the Nuclear...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-01

    ... Supplemental Environmental Impact Statement for the Nuclear Facility Portion of the Chemistry and Metallurgy... construction and operation of the nuclear facility portion of the Chemistry and Metallurgy Research Building... Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, Los Alamos...

  7. Experience with a UNIX based batch computing facility for H1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gerhards, R.; Kruener-Marquis, U.; Szkutnik, Z.

    1994-12-31

    A UNIX based batch computing facility for the H1 experiment at DESY is described. The ultimate goal is to replace the DESY IBM mainframe by a multiprocessor SGI Challenge series computer, using the UNIX operating system, for most of the computing tasks in H1.

  8. Review of the TREAT Conversion Conceptual Design and Fuel Qualification Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Diamond, David

    The U.S. Department of Energy (DOE) is preparing to re establish the capability to conduct transient testing of nuclear fuels at the Idaho National Laboratory (INL) Transient Reactor Test (TREAT) facility. The original TREAT core went critical in February 1959 and operated for more than 6,000 reactor startups before plant operations were suspended in 1994. DOE is now planning to restart the reactor using the plant's original high-enriched uranium (HEU) fuel. At the same time, the National Nuclear Security Administration (NNSA) Office of Material Management and Minimization Reactor Conversion Program is supporting analyses and fuel fabrication studies that will allowmore » for reactor conversion to low-enriched uranium (LEU) fuel (i.e., fuel with less than 20% by weight 235U content) after plant restart. The TREAT Conversion Program's objectives are to perform the design work necessary to generate an LEU replacement core, to restore the capability to fabricate TREAT fuel element assemblies, and to implement the physical and operational changes required to convert the TREAT facility to use LEU fuel.« less

  9. Operation of large RF sources for H-: Lessons learned at ELISE

    NASA Astrophysics Data System (ADS)

    Fantz, U.; Wünderlich, D.; Heinemann, B.; Kraus, W.; Riedl, R.

    2017-08-01

    The goal of the ELISE test facility is to demonstrate that large RF-driven negative ion sources (1 × 1 m2 source area with 360 kW installed RF power) can achieve the parameters required for the ITER beam sources in terms of current densities and beam homogeneity at a filling pressure of 0.3 Pa for pulse lengths of up to one hour. With the experience in operation of the test facility, the beam source inspection and maintenance as well as with the results of the achieved source performance so far, conclusions are drawn for commissioning and operation of the ITER beam sources. Addressed are critical technical RF issues, extrapolations to the required RF power, Cs consumption and Cs ovens, the need of adjusting the magnetic filter field strength as well as the temporal dynamic and spatial asymmetry of the co-extracted electron current. It is proposed to relax the low pressure limit to 0.4 Pa and to replace the fixed electron-to-ion ratio by a power density limit for the extraction grid. This would be highly beneficial for controlling the co-extracted electrons.

  10. Development of the Dual Aerodynamic Nozzle Model for the NTF Semi-Span Model Support System

    NASA Technical Reports Server (NTRS)

    Jones, Greg S.; Milholen, William E., II; Goodliff, Scott L.

    2011-01-01

    The recent addition of a dual flow air delivery system to the NASA Langley National Transonic Facility was experimentally validated with a Dual Aerodynamic Nozzle semi-span model. This model utilized two Stratford calibration nozzles to characterize the weight flow system of the air delivery system. The weight flow boundaries for the air delivery system were identified at mildly cryogenic conditions to be 0.1 to 23 lbm/sec for the high flow leg and 0.1 to 9 lbm/sec for the low flow leg. Results from this test verified system performance and identified problems with the weight-flow metering system that required the vortex flow meters to be replaced at the end of the test.

  11. KSC-02pd0029

    NASA Image and Video Library

    2002-01-17

    KENNEDY SPACE CENTER, FLA. -- Workers in the Vertical Processing Facility test the Near Infrared Camera and Multi-Object Spectrometer (NICMOS) Cooling System, part of the payload on mission STS-109, the Hubble Servicing Telescope Mission. The worker at right is using a black light. NICMOS II is a new experimental cooling system consisting of a compressor and tiny turbines. With the experimental cryogenic system, NASA hopes to re-cool the infrared detectors to below -315 degrees F (-193 degrees Celsius). NICMOS II was previously tested aboard STS-95 in 1998. It could extend the life of the Hubble Space Telescope by several years. Astronauts aboard Columbia on mission STS-109 will be replacing the original NICMOS with the newer version. Launch of mission STS-109 is scheduled for Feb. 28, 2002

  12. A New Simulation Framework for Autonomy in Robotic Missions

    NASA Technical Reports Server (NTRS)

    Flueckiger, Lorenzo; Neukom, Christian

    2003-01-01

    Autonomy is a key factor in remote robotic exploration and there is significant activity addressing the application of autonomy to remote robots. It has become increasingly important to have simulation tools available to test the autonomy algorithms. While indus1;rial robotics benefits from a variety of high quality simulation tools, researchers developing autonomous software are still dependent primarily on block-world simulations. The Mission Simulation Facility I(MSF) project addresses this shortcoming with a simulation toolkit that will enable developers of autonomous control systems to test their system s performance against a set of integrated, standardized simulations of NASA mission scenarios. MSF provides a distributed architecture that connects the autonomous system to a set of simulated components replacing the robot hardware and its environment.

  13. STS-128 crew visits Stennis

    NASA Technical Reports Server (NTRS)

    2009-01-01

    Astronauts C.J. Sturckow (seated, left) and Pat Forrester (seated, right) sign autographs during their Oct. 7 visit to Stennis Space Center. The astronauts visited the rocket engine testing facility to thank Stennis employees for contributions to their recent STS-128 space shuttle mission. All three of the main engines used on the mission were tested at Stennis. Sturckow served as commander for the STS-128 flight; Forrester was a mission specialist. During a 14-day mission aboard space shuttle discovery, the STS-128 crew delivered equipment and supplies to the International Space Station, including science and storage racks, a freezer to store research samples, a new sleeping compartment and an exercise treadmill. The mission featured three spacewalks to replace experiments and install new equipment at the space station.

  14. An engine awaits processing in the new engine shop at KSC

    NASA Technical Reports Server (NTRS)

    1998-01-01

    A new Block 2A engine awaits processing in the low bay of the Space Shuttle Main Engine Processing Facility (SSMEPF). Officially opened on July 6, the new facility replaces the Shuttle Main Engine Shop. The SSMEPF is an addition to the existing Orbiter Processing Facility Bay 3. The engine is scheduled to fly on the Space Shuttle Endeavour during the STS-88 mission in December 1998.

  15. Environmental Assessment -- Hydrothermal Geothermal Subprogram

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1979-06-01

    This environmental impact assessment addresses the design, construction, and operation of an electric generating plant (3 to 4 MWe) and research station (Hawaii Geothermal Research Station (HGRS)) in the Puna district on the Island of Hawaii. The facility will include control and support buildings, parking lots, cooling towers, settling and seepage ponds, the generating plant, and a visitors center. Research activities at the facility will evaluate the ability of a successfully flow-tested well (42-day flow test) to provide steam for power generation over an extended period of time (two years). In future expansion, research activities may include direct heat applicationsmore » such as aquaculture and the effects of geothermal fluids on various plant components and specially designed equipment on test modules. Construction-related impacts would be relatively minor. Construction of the facility will require the distance of about 1.7 ha (4.1 acres). No further disturbance is anticipated, unless it becomes necessary to replace the seepage pond with an injection well, because the production well is in service and adjacent roads and transmission lines are adequate. Disruption of competing land uses will be minimal, and loss of wildlife habitat will be acceptable. Noise should not significantly affect wildlife and local residents; the most noise activities (well drilling and flow testing) have been completed. Water use during construction will not be large, and impacts on competing uses are unlikely. Socio-economic impacts will be small because the project will not employ a large number of local residents and few construction workers will need to find local housing.« less

  16. STS-84 Commander Charles Precourt arriving for TCDT

    NASA Technical Reports Server (NTRS)

    1997-01-01

    STS-84 Commander Charles J. Precourt arrives at KSCs Shuttle Landing Facility for the Terminal Countdown Demonstration Test (TCDT), a dress rehearsal for launch. Precourt will lead the six other crew members when they travel to Mir next month aboard the Space Shuttle Atlantis. STS-84 Mission Specialist C. Michael Foale will be dropped off on Mir to become a member of the Mir 23 crew, replacing U.S. astronaut Jerry M. Linenger, who will return to Earth on Atlantis after about four months on the orbiting station. STS-84 will be the sixth Shuttle-Mir docking. Liftoff is targeted for May 15.

  17. Hypervelocity Impact Evaluation of Metal Foam Core Sandwich Structures

    NASA Technical Reports Server (NTRS)

    Yasensky, John; Christiansen, Eric L.

    2007-01-01

    A series of hypervelocity impact (HVI) tests were conducted by the NASA Johnson Space Center (JSC) Hypervelocity Impact Technology Facility (HITF) [1], building 267 (Houston, Texas) between January 2003 and December 2005 to test the HVI performance of metal foams, as compared to the metal honeycomb panels currently in service. The HITF testing was conducted at the NASA JSC White Sands Testing Facility (WSTF) at Las Cruces, New Mexico. Eric L. Christiansen, Ph.D., and NASA Lead for Micro-Meteoroid Orbital Debris (MMOD) Protection requested these hypervelocity impact tests as part of shielding research conducted for the JSC Center Director Discretionary Fund (CDDF) project. The structure tested is a metal foam sandwich structure; a metal foam core between two metal facesheets. Aluminum and Titanium metals were tested for foam sandwich and honeycomb sandwich structures. Aluminum honeycomb core material is currently used in Orbiter Vehicle (OV) radiator panels and in other places in space structures. It has many desirable characteristics and performs well by many measures, especially when normalized by density. Aluminum honeycomb does not perform well in Hypervelocity Impact (HVI) Testing. This is a concern, as honeycomb panels are often exposed to space environments, and take on the role of Micrometeoroid / Orbital Debris (MMOD) shielding. Therefore, information on possible replacement core materials which perform adequately in all necessary functions of the material would be useful. In this report, HVI data is gathered for these two core materials in certain configurations and compared to gain understanding of the metal foam HVI performance.

  18. Strategic facility planning improves capital decision making.

    PubMed

    Reeve, J R

    2001-03-01

    A large, Midwestern IDS undertook a strategic facility-planning process to evaluate its facility portfolio and determine how best to allocate future investments in facility development. The IDS assembled a facility-planning team, which initiated the planning process with a market analysis to determine future market demands and identify service areas that warranted facility expansion. The team then analyzed each of the IDS's facilities from the perspective of uniform capacity measurements, highest and best use compared with needs, building condition and investment-worthiness, and facility growth and site development opportunities. Based on results of the analysis, the strategy adopted entailed, in part, shifting some space from inpatient care to ambulatory care services and demolishing and replacing the 11 percent of facilities deemed to be in the worst condition.

  19. Report on the Acceptance Test of the CRI Y-MP 8128, 10 February - 12 March 1990

    NASA Technical Reports Server (NTRS)

    Carter, Russell; Kutler, Paul (Technical Monitor)

    1998-01-01

    The NAS Numerical Aerodynamic Simulation Facility's HSP 2 computer system, a CRI Y-MP 832 SN #1002, underwent a major hardware upgrade in February of 1990. The 32 MWord, 6.3 ns mainframe component of the system was replaced with a 128 MWord, 6.0 ns CRI Y-MP 8128 mainframe, SN #1030. A 30 day Acceptance Test of the computer system was performed by the NAS RND HSP group from 08:00 February 10, 1990 to 08:00 March 12, 1990. Overall responsibility for the RND HSP Acceptance Test was assumed by Duane Carbon. The terms of the contract required that the SN #1030 achieve an effectiveness level of greater than or equal to ninety (90) percent for 30 consecutive days within a 60 day time frame. After the first thirty days, the effectiveness level of SN #1030 was 94.4 percent, hence the acceptance test was passed.

  20. Comparison of Refractory Performance in Black Liquor Gasifiers and a Smelt Test System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peascoe, RA

    2001-09-25

    Prior laboratory corrosion studies along with experience at the black liquor gasifier in New Bern, North Carolina, clearly demonstrate that serious material problems exist with the gasifier's refractory lining. Mullite-based and alumina-based refractories used at the New Bern facility suffered significant degradation even though they reportedly performed adequately in smaller scale systems. Oak Ridge National Laboratory's involvement in the failure analysis, and the initial exploration of suitable replacement materials, led to the realization that a simple and reliable, complementary method for refractory screening was needed. The development of a laboratory test system and its suitability for simulating the environment ofmore » black liquor gasifiers was undertaken. Identification and characterization of corrosion products were used to evaluate the test system as a rapid screening tool for refractory performance and as a predictor of refractory lifetime. Results from the test systems and pl ants were qualitatively similar.« less

  1. Facile synthesis of hollow Sn-Co@PMMA nanospheres as high performance anodes for lithium-ion batteries via galvanic replacement reaction and in situ polymerization

    NASA Astrophysics Data System (ADS)

    Yu, Xiaohui; Jiang, Anni; Yang, Hongyan; Meng, Haowen; Dou, Peng; Ma, Daqian; Xu, Xinhua

    2015-08-01

    Polymethyl methacrylate (PMMA)-coated hollow Sn-Co nanospheres (Sn-Co@PMMA) with superior electrochemical performance had been synthesized via a facile galvanic replacement method followed by an in situ emulsion polymerization route. The properties were investigated in detail and results show that the hollow Sn-Co nanospheres were evenly coated with PMMA. Benefiting from the protection of the PMMA layers, the hollow Sn-Co@PMMA nanocomposite is capable of retaining a high capacity of 590 mAh g-1 after 100 cycles with a coulomb efficiency above 98%, revealing better electrochemical properties compared with hollow Sn-Co anodes. The PMMA coating could help accommodate the mechanical strain caused by volume expansion and stabilize the solid electrolyte interphase (SEI) film formed on the electrode. Such a facile process could be further extended to other anode materials for lithium-ion batteries.

  2. 78 FR 74176 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-10

    ... Bases and replacing the isolation time with the phase, ``within limits.'' The proposed change does not... isolation valves are retained in the TS. Future changes to the Bases or licensee-controlled document will be... referenced in the Bases. In addition, the valve isolation times are replaced in the TS with the phase...

  3. Insert Concepts for the Material Science Research Rack (MSRR-1) of the Material Science Research Facility (MSRF) on the International Space Station (ISS)

    NASA Technical Reports Server (NTRS)

    Crouch, Myscha; Carswell, Bill; Farmer, Jeff; Rose, Fred; Tidwell, Paul

    2000-01-01

    The Material Science Research Rack I (MSRR-1) of the Material Science Research Facility (MSRF) contains an Experiment Module (EM) being developed collaboratively by NASA and the European Space Agency (ESA). This NASA/ESA EM will accommodate several different removable and replaceable Module Inserts (MIs) which are installed on orbit NASA's planned inserts include the Quench Module Insert (QMI) and the Diffusion Module Insert (DMI). The QMI is a high-gradient Bridgman-type vacuum furnace with quench capabilities used for experiments on directional solidification of metal alloys. The DMI is a vacuum Bridgman-Stockbarger-type furnace for experiments on Fickian and Soret diffusion in liquids. This paper discusses specific design features and performance capabilities of each insert. The paper also presents current prototype QMI hardware analysis and testing activities and selected results.

  4. KSC-99pp1048

    NASA Image and Video Library

    1999-08-13

    In the Payload Hazardous Servicing Facility (PHSF), a worker begins to open the protective covering over a part of payload flight hardware for the third Hubble Space Telescope Servicing Mission (SM-3A). The hardware will undergo final testing and integration of payload elements in the PHSF. Mission STS-103 is a "call-up" mission which is being planned due to the need to replace portions of the Hubble's pointing system, the gyros, which have begun to fail. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. Launch of STS-103 is currently targeted for Oct. 14 but the date is under review

  5. KSC-99pp1049

    NASA Image and Video Library

    1999-08-13

    In the Payload Hazardous Servicing Facility (PHSF), workers remove the protective covering from a part of payload flight hardware for the third Hubble Space Telescope Servicing Mission (SM-3A). The hardware will undergo final testing and integration of payload elements in the PHSF. Mission STS-103 is a "call-up" mission which is being planned due to the need to replace portions of the Hubble's pointing system, the gyros, which have begun to fail. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. Launch of STS-103 is currently targeted for Oct. 14 but the date is under review

  6. Green Propellant Test Capabilities of the Altitude Combustion Stand at the NASA Glenn Research Center

    NASA Technical Reports Server (NTRS)

    Kubiak, Jonathan M.; Arnett, Lori A.

    2016-01-01

    The NASA Glenn Research Center (GRC) is committed to providing simulated altitude rocket test capabilities to NASA programs, other government agencies, private industry partners, and academic partners. A primary facility to support those needs is the Altitude Combustion Stand (ACS). ACS provides the capability to test combustion components at a simulated altitude up to 100,000 ft. (approx.0.2 psia/10 Torr) through a nitrogen-driven ejector system. The facility is equipped with an axial thrust stand, gaseous and cryogenic liquid propellant feed systems, data acquisition system with up to 1000 Hz recording, and automated facility control system. Propellant capabilities include gaseous and liquid hydrogen, gaseous and liquid oxygen, and liquid methane. A water-cooled diffuser, exhaust spray cooling chamber, and multi-stage ejector systems can enable run times up to 180 seconds to 16 minutes. The system can accommodate engines up to 2000-lbf thrust, liquid propellant supply pressures up to 1800 psia, and test at the component level. Engines can also be fired at sea level if needed. The NASA GRC is in the process of modifying ACS capabilities to enable the testing of green propellant (GP) thrusters and components. Green propellants are actively being explored throughout government and industry as a non-toxic replacement to hydrazine monopropellants for applications such as reaction control systems or small spacecraft main propulsion systems. These propellants offer increased performance and cost savings over hydrazine. The modification of ACS is intended to enable testing of a wide range of green propellant engines for research and qualification-like testing applications. Once complete, ACS will have the capability to test green propellant engines up to 880 N in thrust, thermally condition the green propellants, provide test durations up to 60 minutes depending on thrust class, provide high speed control and data acquisition, as well as provide advanced imaging and diagnostics such as infrared (IR) imaging.

  7. Effects of payment changes on trends in post-acute care.

    PubMed

    Buntin, Melinda Beeuwkes; Colla, Carrie Hoverman; Escarce, José J

    2009-08-01

    To test how the implementation of new Medicare post-acute payment systems affected the use of inpatient rehabilitation facilities (IRFs), skilled nursing facilities (SNFs), and home health agencies. Medicare acute hospital, IRF, and SNF claims; provider of services file; enrollment file; and Area Resource File data. We used multinomial logit models to measure realized access to post-acute care and to predict how access to alternative sites of care changed in response to prospective payment systems. A file was constructed linking data for elderly Medicare patients discharged from acute care facilities between 1996 and 2003 with a diagnosis of hip fracture, stroke, or lower extremity joint replacement. Although the effects of the payment systems on the use of post-acute care varied, most reduced the use of the site of care they directly affected and boosted the use of alternative sites of care. Payment system changes do not appear to have differentially affected the severely ill. Payment system incentives play a significant role in determining where Medicare beneficiaries receive their post-acute care. Changing these incentives results in shifting of patients between post-acute sites.

  8. STS-103 crew take part in CEIT

    NASA Technical Reports Server (NTRS)

    1999-01-01

    During a Crew Equipment Interface Test, STS-103 Commander Curtis L. Brown Jr. (left) and Pilot Scott J. Kelly look at a replacement computer for the Hubble Space Telescope. The payload hardware is in the Payload Hazardous Servicing Facility. Other members of the crew are Mission Specialists Steven L. Smith, C. Michael Foale (Ph.D.), John M. Grunsfeld (Ph.D.), Claude Nicollier of Switzerland, and Jean-Frangois Clervoy of France. Nicollier and Clervoy are with the European Space Agency. Mission STS-103 is a 'call-up' due to the need to replace portions of the pointing system, the gyros, which have begun to fail on the Hubble Space Telescope. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with the new enhanced model, an older data tape recorder with a solid state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. The scheduled launch date in October is under review.

  9. KSC-99pp1092

    NASA Image and Video Library

    1999-09-02

    During a Crew Equipment Interface Test, STS-103 Commander Curtis L. Brown Jr. (left) and Pilot Scott J. Kelly look at a replacement computer for the Hubble Space Telescope. The payload hardware is in the Payload Hazardous Servicing Facility. Other members of the crew are Mission Specialists Steven L. Smith, C. Michael Foale (Ph.D.), John M. Grunsfeld (Ph.D.), Claude Nicollier of Switzerland, and Jean-François Clervoy of France. Nicollier and Clervoy are with the European Space Agency. Mission STS-103 is a "call-up" due to the need to replace portions of the pointing system, the gyros, which have begun to fail on the Hubble Space Telescope. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with the new enhanced model, an older data tape recorder with a solid state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. The scheduled launch date in October is under review

  10. Finding of No Significant Impact for the Environmental Assessment for the Strategic Petroleum Reserve West Hackberry Facility Raw Water Intake Pipeline Replacement Cameron and Calcasieu Parishes, Louisiana

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    N /A

    DOE has prepared an Environmental Assessment (EA), DOE/EA-1497, for the proposed replacement of the existing 107 centimeter (cm) [42 inch (in)] 6.87 kilometer (km) [4.27 mile (mi)] raw water intake pipeline (RWIPL). This action is necessary to allow for continued, optimum operations at the West Hackberry facility (main site/facility). The EA described the proposed action (including action alternatives) and three alternatives to the proposed action. The EA evaluated only the potential environmental consequences of the proposed action (one action alternative), and Alternative 3, which consisted of the No Build Action that is required by 10 CFR 1021.321(c). Based on themore » analysis in DOE/EA-1497, DOE has determined that the proposed action does not constitute a major Federal action significantly affecting humans or the natural environment within the meaning of the National Environmental Policy Act of 1969 (NEPA), 42 USC 4321 et seq. Therefore, an Environmental Impact Statement (EIS) is not required, and DOE is issuing this Finding of No Significant Impact (FONSI). To further minimize impacts to environmental media, the DOE will also implement a Mitigation Action Plan (MAP) for this action. The MAP is included as Appendix F of this EA, which is appended to this FONSI. The Energy Policy and Conservation Act of 1975 (EPCA), as amended, authorizes the creation of the Strategic Petroleum Reserve (SPR) to store crude oil to reduce the United States' vulnerability to energy supply disruptions. Crude oil is stored in geologic formations, or salt domes, located under these facilities. The purpose of this proposed project is to construct a new RWIPL at the main site to replace the existing RWIPL which services this facility.« less

  11. Aid for Facilities

    ERIC Educational Resources Information Center

    Kennedy, Mike

    2009-01-01

    Even before the state fire marshal ordered the Somersworth (N.H.) School District in 2007 to abandon the top two floors of Hilltop Elementary School because of safety concerns, folks in the city of 12,000 had been debating whether the aging facility should be replaced--and how to pay for it. Finally, in February 2009, the city council approved…

  12. Blueprint for Safety

    ERIC Educational Resources Information Center

    Roy, Ken

    2010-01-01

    If your lab facilities are going to be replaced or renovated, you should insist that the science instructors be involved in the process from planning to construction. You know what you'll need in a facility, and your input should be sought out by administrators and architects alike. Once construction is complete, changes can be very costly, so…

  13. 78 FR 72794 - Revisions to Auxiliary Installations, Replacement Facilities, and Siting and Maintenance Regulations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-04

    ... Gas Act (NGA) requires a natural gas company to have certificate authorization for the ``construction...,'' it would not rely on section 2.55 because of ``doubts that the Natural Gas Act authorizes it to... in its procedures with respect to rate filings and certification of natural-gas facilities...

  14. 75 FR 24740 - Recovery Policy RP9523.5, Debris Removal From Waterways

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-05

    ...-0025 and on FEMA's Web site at http://www.fema.gov . You may also view a hard copy of the final policy...-declared major disaster or emergency, supplemental Federal disaster grant assistance for the repair, replacement, or restoration of disaster damaged, publicly-owned facilities and the facilities of certain...

  15. Lasting Value

    ERIC Educational Resources Information Center

    Jolicoeur, Mark; Kahl, Melanie

    2010-01-01

    More than 10 years ago, the U.S. Department of Education estimated that the average age of American school facilities was 40 years. With the slowing education construction market, one can assume that this age is continuing to rise. And this system of aging school facilities begs the question: Renovate or replace? When schools are looking at their…

  16. 76 FR 70118 - Notice of Public Meetings for the Draft Environmental Impact Statement for Basing of MV-22 and H...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-10

    ... and parking apron improvements; construction of additional bachelor enlisted quarters (BEQs... MCB Hawaii Kaneohe Bay, types of basing facilities that are required, improvements at training areas... construction, replacement, and renovation of facilities at MCB Hawaii Kaneohe Bay, and include improvements to...

  17. 36 CFR 1254.10 - For how long and where is my researcher identification card valid?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... facilities in the Washington, DC, area and other NARA facilities that issue and use plastic researcher identification cards as part of their security systems, we issue a plastic card to replace the paper card issued... ARCHIVES AND RECORDS ADMINISTRATION PUBLIC AVAILABILITY AND USE USING RECORDS AND DONATED HISTORICAL...

  18. Velocimetry Overview for visitors from the DOD

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Briggs, Matthew E.; Holtkamp, David Bruce

    2016-08-19

    We are in the midst of a transformative period in which technological advances are making fundamental changes in the measurement techniques that form the backbone of nuclear weapon certification. Optical velocimetry has replaced electrical shorting pins in “Hydrotests,” which measure the dynamic implosion process. This advance has revolutionized nuclear weapons certification during the last 5 years. We can now measure the implosion process that drives a nuclear detonation with many orders of magnitude more resolution in both space and time than was possible just 10 years ago. It has been compared to going from Morse Code to HDTV, resulting inmore » a dozen or more improvements in models of these weapons. These Hydrotests are carried out at LANL, LLNL and the NNSS, with the later holding the important role of allowing us to test with nuclear materials, in sub-critical configurations (i.e., no yield.) Each of these institutions has largely replaced pins with hundreds of channels of optical velocimetry. Velocimetry is non-contact and is used simultaneously with the X-ray capability of these facilities. The U1-a facility at NNSS pioneered this approach in the Gemini series in 2012, and continues to lead, both in channel count and technological advances. Close cooperation among LANL, LLNL and NSTec in these advances serves the complex by leveraging capabilities across sites and accelerating the pace of technical improvements.« less

  19. Reliability and Maintainability Analysis of a High Air Pressure Compressor Facility

    NASA Technical Reports Server (NTRS)

    Safie, Fayssal M.; Ring, Robert W.; Cole, Stuart K.

    2013-01-01

    This paper discusses a Reliability, Availability, and Maintainability (RAM) independent assessment conducted to support the refurbishment of the Compressor Station at the NASA Langley Research Center (LaRC). The paper discusses the methodologies used by the assessment team to derive the repair by replacement (RR) strategies to improve the reliability and availability of the Compressor Station (Ref.1). This includes a RAPTOR simulation model that was used to generate the statistical data analysis needed to derive a 15-year investment plan to support the refurbishment of the facility. To summarize, study results clearly indicate that the air compressors are well past their design life. The major failures of Compressors indicate that significant latent failure causes are present. Given the occurrence of these high-cost failures following compressor overhauls, future major failures should be anticipated if compressors are not replaced. Given the results from the RR analysis, the study team recommended a compressor replacement strategy. Based on the data analysis, the RR strategy will lead to sustainable operations through significant improvements in reliability, availability, and the probability of meeting the air demand with acceptable investment cost that should translate, in the long run, into major cost savings. For example, the probability of meeting air demand improved from 79.7 percent for the Base Case to 97.3 percent. Expressed in terms of a reduction in the probability of failing to meet demand (1 in 5 days to 1 in 37 days), the improvement is about 700 percent. Similarly, compressor replacement improved the operational availability of the facility from 97.5 percent to 99.8 percent. Expressed in terms of a reduction in system unavailability (1 in 40 to 1 in 500), the improvement is better than 1000 percent (an order of magnitude improvement). It is worthy to note that the methodologies, tools, and techniques used in the LaRC study can be used to evaluate similar high value equipment components and facilities. Also, lessons learned in data collection and maintenance practices derived from the observations, findings, and recommendations of the study are extremely important in the evaluation and sustainment of new compressor facilities.

  20. Overview of Corrosion, Erosion, and Synergistic Effects of Erosion and Corrosion in the WTP Pre-treatment Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Imrich, K. J.

    2015-03-27

    Corrosion is an extremely complex process that is affected by numerous factors. Addition of a flowing multi-phase solution further complicates the analysis. The synergistic effects of the multiple corrosive species as well as the flow-induced synergistic effects from erosion and corrosion must be thoroughly evaluated in order to predict material degradation responses. Public domain data can help guide the analysis, but cannot reliably provide the design basis especially when the process is one-of-a-kind, designed for 40 plus years of service, and has no viable means for repair or replacement. Testing in representative simulants and environmental conditions with prototypic components willmore » provide a stronger technical basis for design. This philosophy was exemplified by the Defense Waste Processing Facility (DWPF) at the Savannah River Site and only after 15 plus years of successful operation has it been validated. There have been “hiccups”, some identified during the cold commissioning phase and some during radioactive operations, but they were minor and overcome. In addition, the system is robust enough to tolerate most flowsheet changes and the DWPF design allows minor modifications and replacements – approaches not available with the Hanford Waste Treatment Plant (WTP) “Black Cell” design methodology. Based on the available data, the synergistic effect between erosion and corrosion is a credible – virtually certain – degradation mechanism and must be considered for the design of the WTP process systems. Testing is recommended due to the number of variables (e.g., material properties, process parameters, and component design) that can affect synergy between erosion and corrosion and because the available literature is of limited applicability for the complex process chemistries anticipated in the WTP. Applicable testing will provide a reasonable and defensible path forward for design of the WTP Black Cell and Hard-to-Reach process equipment. These conclusions are consistent with findings from the various Bechtel National Inc., Independent Review Teams, and Department of Energy (DOE) reviews. A test methodology is outlined, which should provide a clear, logical road map for the testing that is necessary to provide applicable and defensible data essential to support design calculations.« less

  1. How do gait frequency and serum-replacement interval affect polyethylene wear in knee-wear simulator tests?

    PubMed

    Reinders, Jörn; Sonntag, Robert; Kretzer, Jan Philippe

    2014-11-01

    Polyethylene wear (PE) is known to be a limiting factor in total joint replacements. However, a standardized wear test (e.g. ISO standard) can only replicate the complex in vivo loading condition in a simplified form. In this study, two different parameters were analyzed: (a) Bovine serum, as a substitute for synovial fluid, is typically replaced every 500,000 cycles. However, a continuous regeneration takes place in vivo. How does serum-replacement interval affect the wear rate of total knee replacements? (b) Patients with an artificial joint show reduced gait frequencies compared to standardized testing. What is the influence of a reduced frequency? Three knee wear tests were run: (a) reference test (ISO), (b) testing with a shortened lubricant replacement interval, (c) testing with reduced frequency. The wear behavior was determined based on gravimetric measurements and wear particle analysis. The results showed that the reduced test frequency only had a small effect on wear behavior. Testing with 1 Hz frequency is therefore a valid method for wear testing. However, testing with a shortened replacement interval nearly doubled the wear rate. Wear particle analysis revealed only small differences in wear particle size between the different tests. Wear particles were not linearly released within one replacement interval. The ISO standard should be revised to address the marked effects of lubricant replacement interval on wear rate.

  2. KENNEDY SPACE CENTER, FLA. - STS-82 crew members and workers at KSC's Vertical Processing Facility get a final look at the Near Infrared Camera and Multi-Object Spectrometer (NICMOS) in its flight configuration for the STS-82 mission. The crew is participating in the Crew Equipment Integration Test (CEIT). NICMOS is one of two new scientific instruments that will replace two outdated instruments on the Hubble Space Telescope (HST). NICMOS will provide HST with the capability for infrared imaging and spectroscopic observations of astronomical targets. The refrigerator-sized NICMOS also is HST's first cryogenic instrument - its sensitive infrared detectors must operate at very cold temperatures of minus 355 degrees Fahrenheit or 58 degrees Kelvin. NICMOS will be installed in Hubble during STS-82, the second Hubble Space Telescope servicing mission. Liftoff is scheduled Feb. 11 aboard Discovery with a crew of seven.

    NASA Image and Video Library

    1997-01-22

    KENNEDY SPACE CENTER, FLA. - STS-82 crew members and workers at KSC's Vertical Processing Facility get a final look at the Near Infrared Camera and Multi-Object Spectrometer (NICMOS) in its flight configuration for the STS-82 mission. The crew is participating in the Crew Equipment Integration Test (CEIT). NICMOS is one of two new scientific instruments that will replace two outdated instruments on the Hubble Space Telescope (HST). NICMOS will provide HST with the capability for infrared imaging and spectroscopic observations of astronomical targets. The refrigerator-sized NICMOS also is HST's first cryogenic instrument - its sensitive infrared detectors must operate at very cold temperatures of minus 355 degrees Fahrenheit or 58 degrees Kelvin. NICMOS will be installed in Hubble during STS-82, the second Hubble Space Telescope servicing mission. Liftoff is scheduled Feb. 11 aboard Discovery with a crew of seven.

  3. Performance testing of a prototype Pd-Ag diffuser

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Morgan, G. A.; Hodge, B. J.

    The fusion fuel cycle has gained significant attention over the last decade as interest in fusion programs has increased. One of the critical components of the fusion process is the tritium fuel cycle. The tritium fuel cycle is designed to supply and recycle process tritium at a specific throughput rate. One of the most important processes within the tritium fuel cycle is the clean-up of the of the process tritium. This step will initially separate the hydrogen isotopes (H2, D2, and T2) from the rest of the process gas using Pd-Ag diffusers or permeators. The Pd-Ag diffuser is an integralmore » component for any tritium purification system; whether part of the United States’ defense mission or fusion programs. Domestic manufacturers of Pd-Ag diffusers are extremely limited and only a few manufacturers exist. Johnson-Matthey (JM) Pd-Ag diffusers (permeators) have previously been evaluated for the separation of hydrogen isotopes from non-hydrogen gas species in the process. JM is no longer manufacturing Pd-Ag diffusers and a replacement vendor needs to be identified to support future needs. A prototype Pd-Ag diffuser has been manufactured by Power and Energy, and is considered a potential replacement for the JM diffuser for tritium service. New diffuser designs for a tritium facility for any fusion energy applications must be characterized by evaluating their operating envelope prior to installation in a tritium processing facility. The prototype Pd-Ag diffuser was characterized to determine the overall performance as a function of the permeation of hydrogen through the membrane. The tests described in this report consider the effects of feed gas compositions, feed flow rates, pump configuration and internal tube pressure on the permeation of H2 through the Pd-Ag tubes.« less

  4. Partial replacement of fossil fuel in a cement plant: risk assessment for the population living in the neighborhood.

    PubMed

    Rovira, Joaquim; Mari, Montse; Nadal, Martí; Schuhmacher, Marta; Domingo, José L

    2010-10-15

    In cement plants, the substitution of traditional fossil fuels not only allows a reduction of CO(2), but it also means to check-out residual materials, such as sewage sludge or municipal solid wastes (MSW), which should otherwise be disposed somehow/somewhere. In recent months, a cement plant placed in Alcanar (Catalonia, Spain) has been conducting tests to replace fossil fuel by refuse-derived fuel (RDF) from MSW. In July 2009, an operational test was progressively initiated by reaching a maximum of partial substitution of 20% of the required energy. In order to study the influence of the new process, environmental monitoring surveys were performed before and after the RDF implementation. Metals and polychlorinated dibenzo-p-dioxins and dibenzofurans (PCDD/Fs) were analyzed in soil, herbage, and air samples collected around the facility. In soils, significant decreases of PCDD/F levels, as well as in some metal concentrations were found, while no significant increases in the concentrations of these pollutants were observed. In turn, PM(10) levels remained constant, with a value of 16μgm(-3). In both surveys, the carcinogenic and non-carcinogenic risks derived from exposure to metals and PCDD/Fs for the population living in the vicinity of the facility were within the ranges considered as acceptable according to national and international standards. This means that RDF may be a successful choice in front of classical fossil fuels, being in accordance with the new EU environmental policies, which entail the reduction of CO(2) emissions and the energetic valorization of MSW. However, further long-term environmental studies are necessary to corroborate the harmlessness of RDF, in terms of human health risks. Copyright © 2010 Elsevier B.V. All rights reserved.

  5. New Phone System Coming to NCI Campus at Frederick | Poster

    Cancer.gov

    By Travis Fouche and Trent McKee, Guest Writers Beginning in September, phones at the NCI Campus at Frederick will begin to be replaced, as the project to upgrade the current phone system ramps up. Over the next 16 months, the Information Systems Program (ISP) will be working with Facilities Maintenance and Engineering and Computer & Statistical Services to replace the current

  6. Relationship of patient volume and service concentration with outcome in geriatric rehabilitation.

    PubMed

    Holstege, Marije S; Zekveld, Ineke G; Caljouw, Monique A A; Peerenboom, Peter Bob; van Balen, Romke; Gussekloo, Jacobijn; Achterberg, Wilco P

    2013-10-01

    Although geriatric rehabilitation (GR) is beneficial for restoration of activities and participation after hospitalization of vulnerable older persons, little is known about the optimal organization of care of these postacute facilities. This study examines the relationship of patient volume and service concentration with successful GR (short length of stay and discharge home) in skilled nursing facilities (SNFs). A national multicenter retrospective cohort study. All patients indicated for GR in a Dutch SNF. Nurses filled out digital registration forms from patient records. Patients were studied in 3 predefined diagnostic groups: total joint replacement, traumatic injuries, and stroke. Facility characteristics were obtained by structured telephone interviews with facility managers. Volume was based on the number of discharges in a 3-month period and categorized in low-, medium-, and high-volume facilities. Concentration was defined at the organizational level in which the population consists of 80% or more of 1 or 2 diagnostic groups, with the prerequisite of having a minimum of 10 rehabilitation beds. From 88 facilities, 2269 GR patients (mean age 78.2 years [SD 9.7]; 68.2% female) were included. The median length of stay in the SNF was 45 days (interquartile range 23-81), 57% of the patients were discharged home, and 9.8% died during GR. Of patients with total joint replacement (n = 501), concentration was related to successful rehabilitation (odds ratio 5.7; 95% confidence interval 1.3-24.3; P = .020, adjusted for age and gender); this relationship was not found for patients with traumatic injuries or stroke. Volume showed no relation with successful rehabilitation in any of the 3 diagnostic groups. This study may indicate that concentration in an SNF, as a proxy for specialization, favors successful GR in total joint replacement. This relationship was not found for the traumatic injuries or stroke groups, or for volume. The relation on functional outcome in GR needs further investigation. Copyright © 2013 American Medical Directors Association, Inc. Published by Elsevier Inc. All rights reserved.

  7. Provider Monitoring and Pay-for-Performance When Multiple Providers Affect Outcomes: An Application to Renal Dialysis

    PubMed Central

    Hirth, Richard A; Turenne, Marc N; Wheeler, John RC; Pan, Qing; Ma, Yu; Messana, Joseph M

    2009-01-01

    Objective To characterize the influence of dialysis facilities and nephrologists on resource use and patient outcomes in the dialysis population and to illustrate how such information can be used to inform payment system design. Data Sources Medicare claims for all hemodialysis patients for whom Medicare was the primary payer in 2004, combined with the Medicare Enrollment Database and the CMS Medical Evidence Form (CMS Form 2728), which is completed at onset of renal replacement therapy. Study Design Resource use (mainly drugs and laboratory tests) per dialysis session and two clinical outcomes (achieving targets for anemia management and dose of dialysis) were modeled at the patient level with random effects for nephrologist and dialysis facility, controlling for patient characteristics. Results For each measure, both the physician and the facility had significant effects. However, facilities were more influential than physicians, as measured by the standard deviation of the random effects. Conclusions The success of tools such as P4P and provider profiling relies upon the identification of providers most able to enhance efficiency and quality. This paper demonstrates a method for determining the extent to which variation in health care costs and quality of care can be attributed to physicians and institutional providers. Because variation in quality and cost attributable to facilities is consistently larger than that attributable to physicians, if provider profiling or financial incentives are targeted to only one type of provider, the facility appears to be the appropriate locus. PMID:19555398

  8. Upgrade of the BATMAN test facility for H- source development

    NASA Astrophysics Data System (ADS)

    Heinemann, B.; Fröschle, M.; Falter, H.-D.; Fantz, U.; Franzen, P.; Kraus, W.; Nocentini, R.; Riedl, R.; Ruf, B.

    2015-04-01

    The development of a radio frequency (RF) driven source for negative hydrogen ions for the neutral beam heating devices of fusion experiments has been successfully carried out at IPP since 1996 on the test facility BATMAN. The required ITER parameters have been achieved with the prototype source consisting of a cylindrical driver on the back side of a racetrack like expansion chamber. The extraction system, called "Large Area Grid" (LAG) was derived from a positive ion accelerator from ASDEX Upgrade (AUG) using its aperture size (ø 8 mm) and pattern but replacing the first two electrodes and masking down the extraction area to 70 cm2. BATMAN is a well diagnosed and highly flexible test facility which will be kept operational in parallel to the half size ITER source test facility ELISE for further developments to improve the RF efficiency and the beam properties. It is therefore planned to upgrade BATMAN with a new ITER-like grid system (ILG) representing almost one ITER beamlet group, namely 5 × 14 apertures (ø 14 mm). Additionally to the standard three grid extraction system a repeller electrode upstream of the grounded grid can optionally be installed which is positively charged against it by 2 kV. This is designated to affect the onset of the space charge compensation downstream of the grounded grid and to reduce the backstreaming of positive ions from the drift space backwards into the ion source. For magnetic filter field studies a plasma grid current up to 3 kA will be available as well as permanent magnets embedded into a diagnostic flange or in an external magnet frame. Furthermore different source vessels and source configurations are under discussion for BATMAN, e.g. using the AUG type racetrack RF source as driver instead of the circular one or modifying the expansion chamber for a more flexible position of the external magnet frame.

  9. Direct provision versus facility collection of HIV self-tests among female sex workers in Uganda: A cluster-randomized controlled health systems trial

    PubMed Central

    Kibuuka Musoke, Daniel; Ngabirano, Thomson; Nakitende, Aidah; Magoola, Jonathan; Kayiira, Prossy; Taasi, Geoffrey; Barresi, Leah G.; McConnell, Margaret A.; Bärnighausen, Till

    2017-01-01

    Background HIV self-testing allows HIV testing at any place and time and without health workers. HIV self-testing may thus be particularly useful for female sex workers (FSWs), who should test frequently but face stigma and financial and time barriers when accessing healthcare facilities. Methods and findings We conducted a cluster-randomized controlled health systems trial among FSWs in Kampala, Uganda, to measure the effect of 2 HIV self-testing delivery models on HIV testing and linkage to care outcomes. FSW peer educator groups (1 peer educator and 8 participants) were randomized to either (1) direct provision of HIV self-tests, (2) provision of coupons for free collection of HIV self-tests in a healthcare facility, or (3) standard of care HIV testing. We randomized 960 participants in 120 peer educator groups from October 18, 2016, to November 16, 2016. Participants’ median age was 28 years (IQR 24–32). Our prespecified primary outcomes were self-report of any HIV testing at 1 month and at 4 months; our prespecified secondary outcomes were self-report of HIV self-test use, seeking HIV-related medical care and ART initiation. In addition, we analyzed 2 secondary outcomes that were not prespecified: self-report of repeat HIV testing—to understand the intervention effects on frequent testing—and self-reported facility-based testing—to quantify substitution effects. Participants in the direct provision arm were significantly more likely to have tested for HIV than those in the standard of care arm, both at 1 month (risk ratio [RR] 1.33, 95% CI 1.17–1.51, p < 0.001) and at 4 months (RR 1.14, 95% CI 1.07–1.22, p < 0.001). Participants in the direct provision arm were also significantly more likely to have tested for HIV than those in the facility collection arm, both at 1 month (RR 1.18, 95% CI 1.07–1.31, p = 0.001) and at 4 months (RR 1.03, 95% CI 1.01–1.05, p = 0.02). At 1 month, fewer participants in the intervention arms had sought medical care for HIV than in the standard of care arm, but these differences were not significant and were reduced in magnitude at 4 months. There were no statistically significant differences in ART initiation across study arms. At 4 months, participants in the direct provision arm were significantly more likely to have tested twice for HIV than those in the standard of care arm (RR 1.51, 95% CI 1.29–1.77, p < 0.001) and those in the facility collection arm (RR 1.22, 95% CI 1.08–1.37, p = 0.001). Participants in the HIV self-testing arms almost completely replaced facility-based testing with self-testing. Two adverse events related to HIV self-testing were reported: interpersonal violence and mental distress. Study limitations included self-reported outcomes and limited generalizability beyond FSWs in similar settings. Conclusions In this study, HIV self-testing appeared to be safe and increased recent and repeat HIV testing among FSWs. We found that direct provision of HIV self-tests was significantly more effective in increasing HIV testing among FSWs than passively offering HIV self-tests for collection in healthcare facilities. HIV self-testing could play an important role in supporting HIV interventions that require frequent HIV testing, such as HIV treatment as prevention, behavior change for transmission reduction, and pre-exposure prophylaxis. Trial registration ClinicalTrials.gov NCT02846402 PMID:29182634

  10. Efficacy of a novel strategy for poststernotomy deep sternal infection after thoracic aorta replacement using a prosthetic graft.

    PubMed

    Kuriyama, Motone; Yoshida, Yukitaka; Ninomiya, Hitoshi; Yamamoto, Shin; Sasaguri, Shiro; Akita, Shinsuke; Mitsukawa, Nobuyuki

    2018-05-01

    Poststernotomy deep sternal wound infections are persistent and occasionally fatal, especially in cases involving prosthetic grafts, because of their complicated structure and virtual impossibility of removal. We aimed to verify the influence of cooperation with plastic surgeons and our novel strategy for treating deep sternal wound infection after aortic replacement on cardiovascular surgery outcomes. Nine hundred eighty-three consecutive patients were divided into two groups: an early group (2012-2013) and a late group (2014-2015). The late group had received cooperatively improved perioperative wound management: our novel strategy of deep sternal infection based on radical debridement and immediate reconstruction decided by reference to severities of the patient's general condition and widespread infection by early intervention of plastic surgeons. The groups were analysed retrospectively. Binary variables were analysed statistically with the Fisher exact test and continuous variables with the Mann-Whitney U test. Inter-group differences were assessed with the chi-square test. Twenty of 390 cases in the early group and 13 of 593 cases in the late group were associated with deep sternal infection. Morbidity rates of deep sternal wound infection and associated mortality rates 1 year after reconstruction surgery were significantly less (p <0.05 for both) in the late group. Intervention by plastic surgeons improved perioperative wound management outcomes. Our treatment strategy for deep sternal wound infection also reduced associated mortality rates. Facilities should consider the early inclusion of plastic surgeons in the treatment of patients undergoing aortic replacement to facilitate better outcomes. Copyright © 2018 British Association of Plastic, Reconstructive and Aesthetic Surgeons. Published by Elsevier Ltd. All rights reserved.

  11. Historic Manhattan Project Sites at Los Alamos

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McGehee, Ellen

    The Manhattan Project laboratory constructed at Los Alamos, New Mexico, beginning in 1943, was intended from the start to be temporary and to go up with amazing speed. Because most of those WWII-era facilities were built with minimal materials and so quickly, much of the original infrastructure was torn down in the late '40s and early '50s and replaced by more permanent facilities. However, a few key facilities remained, and are being preserved and maintained for historic significance. Four such sites are visited briefly in this video, taking viewers to V-Site, the buildings where the first nuclear explosive device wasmore » pre-assembled in preparation for the Trinity Test in Southern New Mexico. Included is another WWII area, Gun Site. So named because it was the area where scientists and engineers tested the so-called "gun method" of assembling nuclear materials -- the fundamental design of the Little Boy weapon that was eventually dropped on Hiroshima. The video also goes to Pajarito Site, home of the "Slotin Building" and "Pond Cabin." The Slotin Building is the place where scientist Louis Slotin conducted a criticality experiment that went awry in early 1946, leading to his unfortunate death, and the Pond Cabin served the team of eminent scientist Emilio Segre who did early chemistry work on plutonium that ultimately led to the Fat Man weapon.« less

  12. Historic Manhattan Project Sites at Los Alamos

    ScienceCinema

    McGehee, Ellen

    2018-05-11

    The Manhattan Project laboratory constructed at Los Alamos, New Mexico, beginning in 1943, was intended from the start to be temporary and to go up with amazing speed. Because most of those WWII-era facilities were built with minimal materials and so quickly, much of the original infrastructure was torn down in the late '40s and early '50s and replaced by more permanent facilities. However, a few key facilities remained, and are being preserved and maintained for historic significance. Four such sites are visited briefly in this video, taking viewers to V-Site, the buildings where the first nuclear explosive device was pre-assembled in preparation for the Trinity Test in Southern New Mexico. Included is another WWII area, Gun Site. So named because it was the area where scientists and engineers tested the so-called "gun method" of assembling nuclear materials -- the fundamental design of the Little Boy weapon that was eventually dropped on Hiroshima. The video also goes to Pajarito Site, home of the "Slotin Building" and "Pond Cabin." The Slotin Building is the place where scientist Louis Slotin conducted a criticality experiment that went awry in early 1946, leading to his unfortunate death, and the Pond Cabin served the team of eminent scientist Emilio Segre who did early chemistry work on plutonium that ultimately led to the Fat Man weapon.

  13. Technical Report from Grant Recipient - City of Redlands

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Giorgianni, Kathleen Margaret

    2016-05-26

    The goals and objectives of the HVAC upgrades are to replace equipment as old as twenty-three (23) years in five different facilities. The project will upgrade some facilities from SEER ratings of 9 to SEER ratings of 14 at a savings of 556 kilowatt hours per ton (savings depends on specific size of the system).

  14. 40 CFR 60.480 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... subpart. (c) Addition or replacement of equipment for the purpose of process improvement which is... all equipment (defined in § 60.481) within a process unit is an affected facility. (b) Any affected... the definition of “process unit” in § 60.481 and the requirements in § 60.482-1(g) of this subpart...

  15. Energy consumption and load profiling at major airports. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kennedy, J.

    1998-12-01

    This report describes the results of energy audits at three major US airports. These studies developed load profiles and quantified energy usage at these airports while identifying procedures and electrotechnologies that could reduce their power consumption. The major power consumers at the airports studied included central plants, runway and taxiway lighting, fuel farms, terminals, people mover systems, and hangar facilities. Several major findings emerged during the study. The amount of energy efficient equipment installed at an airport is directly related to the age of the facility. Newer facilities had more energy efficient equipment while older facilities had much of themore » original electric and natural gas equipment still in operation. As redesign, remodeling, and/or replacement projects proceed, responsible design engineers are selecting more energy efficient equipment to replace original devices. The use of computer-controlled energy management systems varies. At airports, the primary purpose of these systems is to monitor and control the lighting and environmental air conditioning and heating of the facility. Of the facilities studied, one used computer management extensively, one used it only marginally, and one had no computer controlled management devices. At all of the facilities studied, natural gas is used to provide heat and hot water. Natural gas consumption is at its highest in the months of November, December, January, and February. The Central Plant contains most of the inductive load at an airport and is also a major contributor to power consumption inefficiency. Power factor correction equipment was used at one facility but was not installed at the other two facilities due to high power factor and/or lack of need.« less

  16. Aerosol can puncture device operational test plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Leist, K.J.

    1994-05-03

    Puncturing of aerosol cans is performed in the Waste Receiving and Processing Facility Module 1 (WRAP 1) process as a requirement of the waste disposal acceptance criteria for both transuranic (TRU) waste and low-level waste (LLW). These cans have contained such things as paints, lubricating oils, paint removers, insecticides, and cleaning supplies which were used in radioactive facilities. Due to Westinghouse Hanford Company (WHC) Fire Protection concerns of the baseline system`s fire/explosion proof characteristics, a study was undertaken to compare the baseline system`s design to commercially available puncturing devices. While the study found no areas which might indicate a riskmore » of fire or explosion, WHC Fire Protection determined that the puncturing system must have a demonstrated record of safe operation. This could be obtained either by testing the baseline design by an independent laboratory, or by substituting a commercially available device. As a result of these efforts, the commercially available Aerosolv can puncturing device was chosen to replace the baseline design. Two concerns were raised with the system. Premature blinding of the coalescing/carbon filter, due to its proximity to the puncture and draining operation; and overpressurization of the collection bottle due to its small volume and by blinding of the filter assembly. As a result of these concerns, testing was deemed necessary. The objective of this report is to outline test procedures for the Aerosolv.« less

  17. Blood transfusion services in Delhi.

    PubMed

    Makroo, R N; Kumar, N D

    1993-04-01

    In 1991, approximately 40% of total blood requirement in Delhi was collected from commercial blood donors. The rest was supplied by voluntary and replacement donations in hospital-based blood banks and by voluntary blood recruiting agency (Indian Red Cross Society). This study analyses the standards of working and quality assurance in 26 blood transfusion centers in Delhi. The majority of these centers are ill-equipped and lack trained manpower. Most of these do not have adequate testing facilities and any standardized procedure for blood collection. Quality assurance scheme is not being followed and documentation and record maintenance is grossly inadequate. This reports also gives the recommendations for improvements of blood transfusion services in Delhi.

  18. KSC-97pc720

    NASA Image and Video Library

    1997-04-28

    STS-84 Mission Specialist C. Michael Foale, who will become the fifth U.S. astronaut to live and work on the Russian Space Station Mir, arrives at KSC’s Shuttle Landing Facility for the STS-84 Terminal Countdown Demonstration Test (TCDT), a dress rehearsal for launch. Foale will be dropped off on Mir when the Space Shuttle Atlantis docks with Mir next month. He will become a member of the Mir 23 crew, replacing U.S. astronaut Jerry M. Linenger, who will return to Earth on Atlantis after about four months on the orbiting station. STS-84 will be the sixth Shuttle-Mir docking. Liftoff is targeted for May 15

  19. The load shedding advisor: An example of a crisis-response expert system

    NASA Technical Reports Server (NTRS)

    Bollinger, Terry B.; Lightner, Eric; Laverty, John; Ambrose, Edward

    1987-01-01

    A Prolog-based prototype expert system is described that was implemented by the Network Operations Branch of the NASA Goddard Space Flight Center. The purpose of the prototype was to test whether a small, inexpensive computer system could be used to host a load shedding advisor, a system which would monitor major physical environment parameters in a computer facility, then recommend appropriate operator reponses whenever a serious condition was detected. The resulting prototype performed significantly to efficiency gains achieved by replacing a purely rule-based design methodology with a hybrid approach that combined procedural, entity-relationship, and rule-based methods.

  20. Social support and actual versus expected length of stay in inpatient rehabilitation facilities

    PubMed Central

    Lewis, Zakkoyya H.; Hay, Catherine Cooper; Graham, James E.; Lin, Yu-Li; Karmarkar, Amol M.; Ottenbacher, Kenneth J.

    2016-01-01

    Objectives Describe impairment-specific patterns in shorter- and longer-than-expected lengths of stay in inpatient rehabilitation and examine the independent effects of social support on deviations from expected lengths of stay. Design Retrospective cohort study. Setting Inpatient rehabilitation facilities across the United States. Participants Medicare fee-for-service beneficiaries (N=119,437) who were discharged from inpatient rehabilitation facilities in 2012 following stroke, lower extremity fracture, or lower extremity joint replacement. Intervention Not applicable. Main Outcome Measure Relative length of stay (actual – expected). The Centers for Medicare and Medicaid Services posts annual expected lengths of stay based on patients’ clinical profiles at admission. We created a 3-category outcome variable: short, expected, long. Our primary independent variable (social support) also included 3 categories: family/friends, paid/other, none. Results Mean (SD) actual lengths of stay for joint replacement, fracture, and stroke were 9.8 (3.6), 13.8 (4.5), and 15.8 (7.3) days, respectively; relative lengths of stay were −1.2 (3.1), −1.6 (3.7), and −1.7 (5.2) days. Nearly half of patients (47–48%) were discharged more than 1 day earlier than expected in all 3 groups, whereas 14% of joint replacement, 15% of fracture, and 20% of stroke patients were discharged more than 1 day later than expected. In multinomial regression analysis, using family/friends as the reference group, paid/other support was associated (p<.05) with higher odds of long stays in joint replacement. No social support was associated with lower odds of short stays in all 3 impairment groups and higher odds of long stays in fracture and joint replacement. Conclusion Inpatient rehabilitation experiences and outcomes can be substantially impacted by a patient’s level of social support. More research is needed to better understand these relationships and possible unintended consequences in terms of patient access issues and provider-level quality measures. PMID:27373747

  1. Testing FlowTracker2 Performance and Wading Rod Flow Disturbance in Laboratory Tow Tanks

    NASA Astrophysics Data System (ADS)

    Fan, X.; Wagenaar, D.

    2016-12-01

    The FlowTracker2 was released in February 2016 by SonTek (Xylem) to be a more feature-rich and technologically advanced replacement to the Original FlowTracker ADV. These instruments are Acoustic Doppler Velocimeters (ADVs) used for taking high-precision wading discharge and velocity measurements. The accuracy of the FlowTracker2 probe was tested in tow tanks at three different facilities: the USGS Hydrologic Instrumentation Facility (HIF), the Swiss Federal Institute for Metrology (METAS), and at the SonTek Research and Development facility. Multiple mounting configurations were examined, including mounting the ADV probe directly to the tow carts, and incorporating the two most-used wading rods for the FlowTracker (round and hex). Tow speeds ranged from 5cm/s to 1.5m/s, and different tow tank seeding schemes and wait times were examined. In addition, the performance of the FlowTracker2 probe in low Signal-to-Noise Ratio (SNR) environments was compared to the Original FlowTracker ADV. Results confirmed that the FlowTracker2 probe itself performed well within the 1%+0.25cm/s accuracy specification advertised. Tows using the wading rods created a reduced measured velocity by 1.3% of the expected velocity due to flow disturbance, a result similar to the Original FlowTracker ADV despite the change in the FlowTracker2 probe design. Finally, due to improvements in its electronics, the FlowTracker2's performance in low SNR tests exceeded that of the Original FlowTracker ADV, showing less standard error in these conditions compared to its predecessor.

  2. First results from quality assurance testing of MaPMTs for the LHCb RICH upgrade

    NASA Astrophysics Data System (ADS)

    Gambetta, S.; LHCb RICH Collaboration

    2017-12-01

    In 2019 the LHCb RICH detector will be upgraded to increase the read out rate from 1 MHz to 40 MHz. As a consequence, the current Hybrid Photon Detectors will have to be replaced. Multi-anode Photomultiplier Tubes (MaPMTs) from Hamamatsu with 64-channels will be used: the 1-in. R13742 and the 2-in. R13743 MaPMTs (custom modifications of the MaPMTs R11625 and R12699). Quality assurance testing of these MaPMTs using custom-developed readout electronics has started. We present the design and realisation of the test facilities to ensure consistency in testing and validation. A total of 3100 units of the R13742 and 450 units of the R13743 will be tested requiring high efficiency and reliability from the test stations. We report on the test programme and protocols, characterising the units and assuring compliance with specifications. First results of testing and detector characterisation will be presented, based on the pre-series production, comprising 54 units of R13742 and 20 units of R13743.

  3. Control System Upgrade for a Mass Property Measurement Facility

    NASA Technical Reports Server (NTRS)

    Chambers, William; Hinkle, R. Kenneth (Technical Monitor)

    2002-01-01

    The Mass Property Measurement Facility (MPMF) at the Goddard Space Flight Center has undergone modifications to ensure the safety of Flight Payloads and the measurement facility. The MPMF has been technically updated to improve reliability and increase the accuracy of the measurements. Modifications include the replacement of outdated electronics with a computer based software control system, the addition of a secondary gas supply in case of a catastrophic failure to the gas supply and a motor controlled emergency stopping feature instead of a hard stop.

  4. New radiation protection calibration facility at CERN.

    PubMed

    Brugger, Markus; Carbonez, Pierre; Pozzi, Fabio; Silari, Marco; Vincke, Helmut

    2014-10-01

    The CERN radiation protection group has designed a new state-of-the-art calibration laboratory to replace the present facility, which is >20 y old. The new laboratory, presently under construction, will be equipped with neutron and gamma sources, as well as an X-ray generator and a beta irradiator. The present work describes the project to design the facility, including the facility placement criteria, the 'point-zero' measurements and the shielding study performed via FLUKA Monte Carlo simulations. © The Author 2013. Published by Oxford University Press. All rights reserved. For Permissions, please email: journals.permissions@oup.com.

  5. Design and testing of an energy-absorbing crewseat for the F/FB-111 aircraft. Volume 2: Data from seat testing

    NASA Technical Reports Server (NTRS)

    Shane, S. J.

    1985-01-01

    The unacceptably high injury rate during the escape sequence (including the ejection and ground impact) of the crew module for F/FB-111 aircraft is reviewed. A program to determine if the injury potential could be reduced by replacing the existing crewseats with energy absorbing crewseats is presented. An energy absorbing test seat is designed using much of the existing seat hardware. An extensive dynamic seat test series, designed to duplicate various crew module ground impact conditions is conducted at a sled test facility. Comparative tests with operational F-111 crewseats are also conducted. After successful dynamic testing of the seat, more testing is conducted with the seats mounted in an F-111 crew module. Both swing tests and vertical drop tests are conducted. The vertical drop tests are used to obtain comparative data between the energy absorbing and operational seats. Volume 1 describes the energy absorbing test seat and testing conducted, and evaluates the data from both test series. Volume 2 presents the data obtained during the seat test series, while Volume 3 presents the data from the crew module test series.

  6. STS-103 crew take part in CEIT

    NASA Technical Reports Server (NTRS)

    1999-01-01

    In the Payload Hazardous Servicing Facility, a member of the STS-103 crew checks out rib clamp to be used on the Shield Shell Replacement Fabric (SSRF) task on repair of the Hubble Space Telescope. The seven-member crew, taking part in a Crew Equipment Interface Test, are Commander Curtis L. Brown Jr., Pilot Scott J. Kelly, and Mission Specialists Steven L. Smith, C. Michael Foale (Ph.D.), John M. Grunsfeld (Ph.D.), Claude Nicollier of Switzerland, and Jean-Frangois Clervoy of France. Nicollier and Clervoy are with the European Space Agency. Mission STS-103 is a 'call-up' due to the need to replace portions of the pointing system, the gyros, which have begun to fail on the Hubble Space Telescope. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. The scheduled launch date in October is under review.

  7. Inactivation of stable viruses in cell culture facilities by peracetic acid fogging.

    PubMed

    Gregersen, Jens-Peter; Roth, Bernhard

    2012-07-01

    Looking for a robust and simple method to replace formaldehyde fumigation for the disinfection of virus-handling laboratories and facilities, we tested peracetic acid fogging as a method to inactivate stable viruses under practical conditions. Peracetic acid/hydrogen peroxide (5.8%/27.5%, 2.0 mL/m³) was diluted in sufficient water to achieve ≥ 70% relative humidity and was vaporized as <10 μm droplets in a fully equipped 95 m³ laboratory unit. High titers of reovirus 3, MVM parvovirus and an avian polyomavirus were coated on frosted glass carriers and were exposed to the peracetic acid fog in various positions in the laboratory. After vaporization, a 60 min exposure time, and venting of the laboratory, no residual virus was detected on any of the carriers (detection limit <1 infectious unit/sample volume tested). The log reduction values were 9.0 for reovirus, 6.4 for MVM parvovirus, and 7.65 for the polyomavirus. After more than 10 disinfection runs within 12 months, no damage or functional impairment of electrical and electronic equipment was noted. Copyright © 2012 The International Alliance for Biological Standardization. Published by Elsevier Ltd. All rights reserved.

  8. Advanced Coal Liquefaction Research and Development Facility, Wilsonville, Alabama. Run 260 with Black Thunder Mine subbituminous coal: Technical progress report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This report presents the results of Run 260 performed at the Advanced Coal Liquefaction R&D Facility in Wilsonville. The run was started on July 17, 1990 and continued until November 14, 1990, operating in the Close-Coupled Integrated Two-Stage Liquefaction mode processing Black Thunder mine subbituminous coal (Wyodak-Anderson seam from Wyoming Powder River Basin). Both thermal/catalytic and catalytic/thermal tests were performed to determine the methods for reducing solids buildup in a subbituminous coal operation, and to improve product yields. A new, smaller interstage separator was tested to reduce solids buildup by increasing the slurry space velocity in the separator. In ordermore » to obtain improved coal and resid conversions (compared to Run 258) full-volume thermal reactor and 3/4-volume catalytic reactor were used. Shell 324 catalyst, 1/16 in. cylindrical extrudate, at a replacement rate of 3 lb/ton of MF coal was used in the catalytic stage. Iron oxide was used as slurry catalyst at a rate of 2 wt % MF coal throughout the run. (TNPS was the sulfiding agent.)« less

  9. Droplet Combustion and Non-Reactive Shear-Coaxial Jets with Transverse Acoustic Excitation

    DTIC Science & Technology

    2012-06-01

    Shear-Coaxial Jets Experimental Facility: Piping and Instrumentation Diagram . . . . . . . . . . . . . . . . . . . . . . 196 B Shear-Coaxial Jets...facility piping and instrumentation diagram. . . . . . . . . 197 A.2 Expanded view of section A in Figure A.1. . . . . . . . . . . . . . . . . . 198 A.3...certified to be used in flexible fuel vehicles (FFVs) with engines specifically designed for this fuel. As for possible aviation fuel replacements

  10. 75 FR 6309 - Approval and Promulgation of Implementation Plans Georgia: State Implementation Plan Revision

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-09

    ... subparagraph (4)(b)4, relating to sulfur dioxide, to correct an error in the standard condition for temperature... subparagraph (b)5(i) to clarify the specific equipment covered by permit-by-rule for hot mix asphalt plants... million BtU per hour'' is replaced by ``hot mix asphalt facilities,'' to best describe the facilities...

  11. Environmental Assessment for the Replacement of Water Reservoirs

    DTIC Science & Technology

    2005-03-25

    Intensive extraction of groundwater does not occur at Travis because of poor water- bearing subsurface geology. Intensive extraction SECTION 3.0...largest contiguous estuarine marsh and the largest wetland in the continental United States (CH2M HILL, 2001). Suisun Marsh drains into Grizzly and...and other support facilities. • Community (Commercial) – Uses include the exchange, commissary, banking, dining facilities, eating

  12. Decomposing racial and ethnic disparities in the use of postacute rehabilitation care.

    PubMed

    Holmes, George M; Freburger, Janet K; Ku, Li-Jung E

    2012-06-01

    To determine the degree to which racial and ethnic disparities in the use of postacute rehabilitation care (PARC) are explained by observed characteristics. State inpatient databases (SIDs) for 2005 and 2006 from four diverse states were used to identify patients with stays for joint replacement, stroke, or hip fracture. Our primary outcomes were use of institutional PARC (versus discharge home) and, conditional on discharge to an institution, skilled nursing facility (versus inpatient rehabilitation facility) care. We modified the Oaxaca-Blinder decomposition method to account for the dichotomous outcome and multilevel nature of the data. Discharges from the four SIDs were included if the principal diagnosis (stroke, hip fracture) or procedure (joint replacement) was in the sample inclusion criteria. Observed characteristics explained roughly half of the unadjusted differences in use of institutional PARC. Patient-level factors (clinical, age) were more explanatory of disparities in institutional PARC use, while hospital-level factors were more explanatory of skilled nursing facility versus inpatient rehabilitation facility care. Adjustment for characteristics influencing PARC use both mitigated and exacerbated racial/ethnic disparities in use. The degree to which the characteristics explained the disparity varied across conditions and outcomes. © Health Research and Educational Trust.

  13. Hubble (HST) hardware arrives at KSC for servicing mission, STS-103

    NASA Technical Reports Server (NTRS)

    1999-01-01

    A shipping container with payload flight hardware for the Third Hubble Space Telescope Servicing Mission (SM-3A) sits on a flatbed trailer for transfer to the Payload Hazardous Servicing Facility where it will undergo final testing and integration of payload elements. Mission STS-103 is a 'call-up' mission which is being planned due to the need to replace portions of the Hubble's pointing system, the gyros, which have begun to fail. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. Launch of STS-93 is currently targeted for Oct. 14 but under review, pending the launch date of a prior mission, STS-99, also under review.

  14. Hubble (HST) hardware is unwrapped in the PHSF

    NASA Technical Reports Server (NTRS)

    1999-01-01

    In the Payload Hazardous Servicing Facility (PHSF), a worker begins to open the protective covering over a part of payload flight hardware for the third Hubble Space Telescope Servicing Mission (SM-3A). The hardware will undergo final testing and integration of payload elements in the PHSF. Mission STS-103 is a 'call-up' mission which is being planned due to the need to replace portions of the Hubble's pointing system, the gyros, which have begun to fail. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. Launch of STS-103 is currently targeted for Oct. 14 but the date is under review.

  15. Hubble (HST) hardware is uncrated in the PHSF

    NASA Technical Reports Server (NTRS)

    1999-01-01

    In the Payload Hazardous Servicing Facility (PHSF), a crane lifts equipment for mission STS-103 out of its shipping container to move it to a workstand. The equipment is the first part of payload flight hardware for the third Hubble Space Telescope Servicing Mission (SM-3A). The hardware will undergo final testing and integration of payload elements in the PHSF. Mission STS-103 is a 'call-up' mission which is being planned due to the need to replace portions of the Hubble's pointing system, the gyros, which have begun to fail. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. Launch of STS-103 is currently targeted for Oct. 14 but the date is under review.

  16. Hubble (HST) hardware is uncrated in the PHSF

    NASA Technical Reports Server (NTRS)

    1999-01-01

    In the Payload Hazardous Servicing Facility (PHSF), a crane lifts equipment for mission STS-103 out of its shipping container. The equipment is the first part of payload flight hardware for the third Hubble Space Telescope Servicing Mission (SM-3A). The hardware will undergo final testing and integration of payload elements in the PHSF. Mission STS-103 is a 'call-up' mission which is being planned due to the need to replace portions of the Hubble's pointing system, the gyros, which have begun to fail. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. Launch of STS-103 is currently targeted for Oct. 14 but the date is under review.

  17. KSC-99pp1038

    NASA Image and Video Library

    1999-08-12

    A C-5 air cargo plane opens to reveal a shipping container with payload flight hardware for the Third Hubble Space Telescope Servicing Mission (SM-3A). The hardware will be taken to the Payload Hazardous Servicing Facility for final testing and integration of payload elements. Mission STS-103 is a "call-up" mission which is being planned due to the need to replace portions of the Hubble's pointing system, the gyros, which have begun to fail. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. Launch of STS-93 is currently targeted for Oct. 14 but under review, pending the launch date of a prior mission, STS-99, also under review

  18. KSC-99pp1039

    NASA Image and Video Library

    1999-08-12

    A shipping container with payload flight hardware for the Third Hubble Space Telescope Servicing Mission (SM-3A) is ready for transfer onto a transporter from the C-5 air cargo plane that brought it to KSC. The hardware will be taken to the Payload Hazardous Servicing Facility for final testing and integration of payload elements. Mission STS-103 is a "call-up" mission which is being planned due to the need to replace portions of the Hubble's pointing system, the gyros, which have begun to fail. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. Launch of STS-93 is currently targeted for Oct. 14 but under review, pending the launch date of a prior mission, STS-99, also under review

  19. KSC-99pp1041

    NASA Image and Video Library

    1999-08-12

    A shipping container with payload flight hardware for the Third Hubble Space Telescope Servicing Mission (SM-3A) sits on a flatbed trailer for transfer to the Payload Hazardous Servicing Facility where it will undergo final testing and integration of payload elements. Mission STS-103 is a "call-up" mission which is being planned due to the need to replace portions of the Hubble's pointing system, the gyros, which have begun to fail. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. Launch of STS-93 is currently targeted for Oct. 14 but under review, pending the launch date of a prior mission, STS-99, also under review

  20. KSC-99pp1050

    NASA Image and Video Library

    1999-08-13

    KENNEDY SPACE CENTER, FLA. -- Inside the Payload Hazardous Servicing Facility (PHSF), a part of payload flight hardware, intended for the third Hubble Space Telescope Servicing Mission (SM-3A), is revealed after its protective cover has been removed. The hardware will undergo final testing and integration of payload elements in the PHSF. Mission STS-103 is a "call-up" mission which is being planned due to the need to replace portions of the Hubble's pointing system, the gyros, which have begun to fail. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. Launch of STS-103 is currently targeted for Oct. 14 but the date is under review

  1. KSC-99pp1043

    NASA Image and Video Library

    1999-08-13

    In the Payload Hazardous Servicing Facility (PHSF), a crane lifts equipment for mission STS-103 out of its shipping container to move it to a workstand. The equipment is the first part of payload flight hardware for the third Hubble Space Telescope Servicing Mission (SM-3A). The hardware will undergo final testing and integration of payload elements in the PHSF. Mission STS-103 is a "call-up" mission which is being planned due to the need to replace portions of the Hubble's pointing system, the gyros, which have begun to fail. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. Launch of STS-103 is currently targeted for Oct. 14 but the date is under review

  2. KSC-99pp1042

    NASA Image and Video Library

    1999-08-13

    In the Payload Hazardous Servicing Facility (PHSF), a crane lifts equipment for mission STS-103 out of its shipping container. The equipment is the first part of payload flight hardware for the third Hubble Space Telescope Servicing Mission (SM-3A). The hardware will undergo final testing and integration of payload elements in the PHSF. Mission STS-103 is a "call-up" mission which is being planned due to the need to replace portions of the Hubble's pointing system, the gyros, which have begun to fail. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. Launch of STS-103 is currently targeted for Oct. 14 but the date is under review

  3. KSC-99pp1040

    NASA Image and Video Library

    1999-08-12

    A shipping container with payload flight hardware for the Third Hubble Space Telescope Servicing Mission (SM-3A) is transferred onto a transporter from the C-5 air cargo plane that brought it to KSC. The hardware will be taken to the Payload Hazardous Servicing Facility for final testing and integration of payload elements. Mission STS-103 is a "call-up" mission which is being planned due to the need to replace portions of the Hubble's pointing system, the gyros, which have begun to fail. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. Launch of STS-93 is currently targeted for Oct. 14 but under review, pending the launch date of a prior mission, STS-99, also under review

  4. KSC-99pp1037

    NASA Image and Video Library

    1999-08-12

    A C-5 air cargo plane lands at Kennedy Space Center carrying the payload flight hardware for the Third Hubble Space Telescope Servicing Mission (SM-3A). The hardware will be taken to the Payload Hazardous Servicing Facility for final testing and integration of payload elements. Mission STS-103 is a "call-up" mission which is being planned due to the need to replace portions of the Hubble's pointing system, the gyros, which have begun to fail. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. Launch of STS-93 is currently targeted for Oct. 14 but under review, pending the launch date of a prior mission, STS-99, also under review

  5. KSC-99pp1044

    NASA Image and Video Library

    1999-08-13

    In the Payload Hazardous Servicing Facility (PHSF), workers check the placement of equipment, part of mission STS-103, onto a workstand. The equipment is the first part of payload flight hardware for the third Hubble Space Telescope Servicing Mission (SM-3A). The hardware will undergo final testing and integration of payload elements in the PHSF. Mission STS-103 is a "call-up" mission which is being planned due to the need to replace portions of the Hubble's pointing system, the gyros, which have begun to fail. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. Launch of STS-103 is currently targeted for Oct. 14 but the date is under review

  6. Hubble (HST) hardware is moved to a workstand in the PHSF

    NASA Technical Reports Server (NTRS)

    1999-01-01

    In the Payload Hazardous Servicing Facility (PHSF), workers check the placement of equipment, part of mission STS-103, onto a workstand. The equipment is the first part of payload flight hardware for the third Hubble Space Telescope Servicing Mission (SM-3A). The hardware will undergo final testing and integration of payload elements in the PHSF. Mission STS-103 is a 'call-up' mission which is being planned due to the need to replace portions of the Hubble's pointing system, the gyros, which have begun to fail. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. Launch of STS-103 is currently targeted for Oct. 14 but the date is under review.

  7. Production Facility Prototype Blower 1000 Hour Test Results

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Woloshun, Keith Albert; Dale, Gregory E.; Romero, Frank Patrick

    2016-10-18

    The roots blower in use at ANL for in-beam experiments and also at LANL for flow tests was sized for 12 mm diameter disks and significantly less beam heating. Currently, the disks are 29 mm in diameter, with a 12 mm FWHM Gaussian beam spot at 42 MeV and 2.86 μA on each side of the target, 5.72 μA total. The target design itself is reported elsewhere. With the increased beam heating, the helium flow requirement increased so that a larger blower was needed for a mass flow rate of 400 g/s at 2.76 MPa (400 psig). An Aerzen GMmore » 12.4 blower was selected, and is now installed at the LANL facility for target and component flow testing. Two extended tests of >1000 hr operation have been completed. Those results and discussion thereof are reported herein. Also included in Appendix A is the detailed description of the blower and its installation, while Appendix B documents the pressure vessel design analysis. The blower has been operated for 1000 hours as a preliminary investigation of long-term performance, operation and possible maintenance issues. The blower performed well, with no significant change in blower head or mass flow rate developed under the operating conditions. Upon inspection, some oil had leaked out of the shaft seal of the blower. The shaft seal and bearing race have been replaced. Test results and conclusions are in Appendix B.« less

  8. Multimillion Dollar Construction Project Completed in Glenn's Icing Research Tunnel

    NASA Technical Reports Server (NTRS)

    Kevdzija, Susan L.

    2001-01-01

    Over the last year, the Glenn Research Center's Icing Research Tunnel (IRT) underwent a major $5.2 million rehabilitation project as part of the Construction of Facilities program. The scope of the project included redesign and replacement of the 55-yr-old heat exchanger, the addition of fan outlet guide vanes for flow conditioning downstream of the 25-ft-diameter fan, and redesign and replacement of the C and D corner-turning vanes. The purpose of the rehabilitation was to replace old portions of the infrastructure and to improve the aerodynamic flow quality in the tunnel.

  9. KENNEDY SPACE CENTER, FLA. -- A new control tower is nearing completion at the KSC Shuttle Landing Facility. It will replace the old tower in use since 1987. The old tower stands only 20 feet above the runway surface, too low to see the launch pads to the east. During nighttime landing operations, those inside the tower have been hindered by the eight-billion candlepower xenon lights that illuminate the runway. The new control tower is built atop an existing mound, rising nearly 100 feet over the midpoint of the runway. The height gives controllers a spectacular 360-degree view of NASA-KSC and northern Brevard County. The new facility will also replace the SLF Operations Building. The operations building is home to the Military Radar Unit that monitors NASA-KSC airspace 24 hours a day, as well as runway light controls, navigational aids, weather and wind speed instrumentation, and gate controls. In the new tower, the computer displays will be fully modernized to Federal Aviation Administration standards with touch-screen technology. Construction on the new facility began in February 2003 and is nearly ready for occupancy. Only some final inspections and approvals remain. A support building and Public Affairs viewing deck, to be used for observing future landing operations, will be added and are already in work.

    NASA Image and Video Library

    2003-12-17

    KENNEDY SPACE CENTER, FLA. -- A new control tower is nearing completion at the KSC Shuttle Landing Facility. It will replace the old tower in use since 1987. The old tower stands only 20 feet above the runway surface, too low to see the launch pads to the east. During nighttime landing operations, those inside the tower have been hindered by the eight-billion candlepower xenon lights that illuminate the runway. The new control tower is built atop an existing mound, rising nearly 100 feet over the midpoint of the runway. The height gives controllers a spectacular 360-degree view of NASA-KSC and northern Brevard County. The new facility will also replace the SLF Operations Building. The operations building is home to the Military Radar Unit that monitors NASA-KSC airspace 24 hours a day, as well as runway light controls, navigational aids, weather and wind speed instrumentation, and gate controls. In the new tower, the computer displays will be fully modernized to Federal Aviation Administration standards with touch-screen technology. Construction on the new facility began in February 2003 and is nearly ready for occupancy. Only some final inspections and approvals remain. A support building and Public Affairs viewing deck, to be used for observing future landing operations, will be added and are already in work.

  10. KENNEDY SPACE CENTER, FLA. -- The existing control tower seen here at the edge of the KSC Shuttle Landing Facility is being replaced. In use since 1987, the old tower stands only 20 feet above the runway surface, too low to see the launch pads to the east. During nighttime landing operations, those inside the tower have been hindered by the eight-billion candlepower xenon lights that illuminate the runway. The new control tower is built atop an existing mound, rising nearly 100 feet over the midpoint of the runway. The height gives controllers a spectacular 360-degree view of NASA-KSC and northern Brevard County. The new facility will also replace the SLF Operations Building. The operations building is home to the Military Radar Unit that monitors NASA-KSC airspace 24 hours a day, as well as runway light controls, navigational aids, weather and wind speed instrumentation, and gate controls. In the new tower, the computer displays will be fully modernized to Federal Aviation Administration standards with touch-screen technology. Construction on the new facility began in February 2003 and is nearly ready for occupancy. Only some final inspections and approvals remain. A support building and Public Affairs viewing deck, to be used for observing future landing operations, will be added and are already in work.

    NASA Image and Video Library

    2003-12-17

    KENNEDY SPACE CENTER, FLA. -- The existing control tower seen here at the edge of the KSC Shuttle Landing Facility is being replaced. In use since 1987, the old tower stands only 20 feet above the runway surface, too low to see the launch pads to the east. During nighttime landing operations, those inside the tower have been hindered by the eight-billion candlepower xenon lights that illuminate the runway. The new control tower is built atop an existing mound, rising nearly 100 feet over the midpoint of the runway. The height gives controllers a spectacular 360-degree view of NASA-KSC and northern Brevard County. The new facility will also replace the SLF Operations Building. The operations building is home to the Military Radar Unit that monitors NASA-KSC airspace 24 hours a day, as well as runway light controls, navigational aids, weather and wind speed instrumentation, and gate controls. In the new tower, the computer displays will be fully modernized to Federal Aviation Administration standards with touch-screen technology. Construction on the new facility began in February 2003 and is nearly ready for occupancy. Only some final inspections and approvals remain. A support building and Public Affairs viewing deck, to be used for observing future landing operations, will be added and are already in work.

  11. Final Environmental Assessment: Replace Hanscom AFB Middle School

    DTIC Science & Technology

    2012-04-01

    term impacts on wastewater facilities are anticipated during the demolition/construction of the Middle School. Portable toilets may be available for...7.14. CUMULATIVE IMPACTS 7-18 SECTION 8. MEASURES TO REDUCE POTENTIAL FOR IMPACT 8-1 SECTION 9. CONSULTATION LETTERS, EMAILS, AND PUBLIC NOTICE 9-1...U.S. Air Force April 2012 1 FINDING OF NO SIGNIFICANT IMPACT Name of Action: Replace Hanscom AFB Middle School Hanscom Air Force Base

  12. KENNEDY SPACE CENTER, FLA. - STS-114 Commander Eileen Collins and Mission Specialist Wendy Lawrence look over mission equipment in the Space Station Processing Facility. Crew members are at KSC for equipment familiarization. STS-114 is classified as Logistics Flight 1 to the International Space Station, delivering new supplies and replacing one of the orbital outpost’s Control Moment Gyroscopes (CMGs). STS-114 will also carry a Raffaello Multi-Purpose Logistics Module and the External Stowage Platform-2. The crew is slated to conduct at least three spacewalks: They will demonstrate repair techniques of the Shuttle’s Thermal Protection System, replace the failed CMG with one delivered by the Shuttle, and install the External Stowage Platform.

    NASA Image and Video Library

    2004-01-27

    KENNEDY SPACE CENTER, FLA. - STS-114 Commander Eileen Collins and Mission Specialist Wendy Lawrence look over mission equipment in the Space Station Processing Facility. Crew members are at KSC for equipment familiarization. STS-114 is classified as Logistics Flight 1 to the International Space Station, delivering new supplies and replacing one of the orbital outpost’s Control Moment Gyroscopes (CMGs). STS-114 will also carry a Raffaello Multi-Purpose Logistics Module and the External Stowage Platform-2. The crew is slated to conduct at least three spacewalks: They will demonstrate repair techniques of the Shuttle’s Thermal Protection System, replace the failed CMG with one delivered by the Shuttle, and install the External Stowage Platform.

  13. KENNEDY SPACE CENTER, FLA. - STS-114 Mission Specialist Andrew Thomas works on equipment in the Space Station Processing Facility. He and other crew members are at KSC for equipment familiarization. STS-114 is classified as Logistics Flight 1 to the International Space Station, delivering new supplies and replacing one of the orbital outpost’s Control Moment Gyroscopes (CMGs). STS-114 will also carry a Raffaello Multi-Purpose Logistics Module and the External Stowage Platform-2. The crew is slated to conduct at least three spacewalks: They will demonstrate repair techniques of the Shuttle’s Thermal Protection System, replace the failed CMG with one delivered by the Shuttle, and install the External Stowage Platform.

    NASA Image and Video Library

    2004-01-27

    KENNEDY SPACE CENTER, FLA. - STS-114 Mission Specialist Andrew Thomas works on equipment in the Space Station Processing Facility. He and other crew members are at KSC for equipment familiarization. STS-114 is classified as Logistics Flight 1 to the International Space Station, delivering new supplies and replacing one of the orbital outpost’s Control Moment Gyroscopes (CMGs). STS-114 will also carry a Raffaello Multi-Purpose Logistics Module and the External Stowage Platform-2. The crew is slated to conduct at least three spacewalks: They will demonstrate repair techniques of the Shuttle’s Thermal Protection System, replace the failed CMG with one delivered by the Shuttle, and install the External Stowage Platform.

  14. 24 CFR 232.902 - Eligible project.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... INSURANCE FOR NURSING HOMES, INTERMEDIATE CARE FACILITIES, BOARD AND CARE HOMES, AND ASSISTED LIVING... sufficient to pay operating expenses, annual debt service and reserve fund for replacement requirements) as...

  15. 76 FR 61346 - Sunshine Act Notice

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-04

    ... defense nuclear facilities, including the Chemistry and Metallurgy Research Building, Area G in Technical... the integration of safety-in-design for the Chemistry and Metallurgy Research Replacement project, the...

  16. Project Delivery Methods.

    ERIC Educational Resources Information Center

    Dolan, Thomas G.

    2003-01-01

    Describes project delivery methods that are replacing the traditional Design/Bid/Build linear approach to the management, design, and construction of new facilities. These variations can enhance construction management and teamwork. (SLD)

  17. Effects of Payment Changes on Trends in Post-Acute Care

    PubMed Central

    Buntin, Melinda Beeuwkes; Colla, Carrie Hoverman; Escarce, José J

    2009-01-01

    Objective To test how the implementation of new Medicare post-acute payment systems affected the use of inpatient rehabilitation facilities (IRFs), skilled nursing facilities (SNFs), and home health agencies. Data Sources Medicare acute hospital, IRF, and SNF claims; provider of services file; enrollment file; and Area Resource File data. Study Design We used multinomial logit models to measure realized access to post-acute care and to predict how access to alternative sites of care changed in response to prospective payment systems. Data Extraction Methods A file was constructed linking data for elderly Medicare patients discharged from acute care facilities between 1996 and 2003 with a diagnosis of hip fracture, stroke, or lower extremity joint replacement. Principal Findings Although the effects of the payment systems on the use of post-acute care varied, most reduced the use of the site of care they directly affected and boosted the use of alternative sites of care. Payment system changes do not appear to have differentially affected the severely ill. Conclusions Payment system incentives play a significant role in determining where Medicare beneficiaries receive their post-acute care. Changing these incentives results in shifting of patients between post-acute sites. PMID:19490159

  18. Accomplishments of the Advanced Reusable Technologies (ART) RBCC Project at NASA/Marshall Space Flight Center

    NASA Technical Reports Server (NTRS)

    Nelson, Karl W.; McArthur, J. Craig (Technical Monitor)

    2001-01-01

    The focus of the NASA / Marshall Space Flight Center (MSFC) Advanced Reusable Technologies (ART) project is to advance and develop Rocket-Based Combined-Cycle (RBCC) technologies. The ART project began in 1996 as part of the Advanced Space Transportation Program (ASTP). The project is composed of several activities including RBCC engine ground testing, tool development, vehicle / mission studies, and component testing / development. The major contractors involved in the ART project are Aerojet and Rocketdyne. A large database of RBCC ground test data was generated for the air-augmented rocket (AAR), ramjet, scramjet, and ascent rocket modes of operation for both the Aerojet and Rocketdyne concepts. Transition between consecutive modes was also demonstrated as well as trajectory simulation. The Rocketdyne freejet tests were conducted at GASL in the Flight Acceleration Simulation Test (FAST) facility. During a single test, the FAST facility is capable of simulating both the enthalpy and aerodynamic conditions over a range of Mach numbers in a flight trajectory. Aerojet performed freejet testing in the Pebble Bed facility at GASL as well as direct-connect testing at GASL. Aerojet also performed sea-level static (SLS) testing at the Aerojet A-Zone facility in Sacramento, CA. Several flight-type flowpath components were developed under the ART project. Aerojet designed and fabricated ceramic scramjet injectors. The structural design of the injectors will be tested in a simulated scramjet environment where thermal effects and performance will be assessed. Rocketdyne will be replacing the cooled combustor in the A5 rig with a flight-weight combustor that is near completion. Aerojet's formed duct panel is currently being fabricated and will be tested in the SLS rig in Aerojet's A-Zone facility. Aerojet has already successfully tested a cooled cowl panel in the same facility. In addition to MSFC, other NASA centers have contributed to the ART project as well. Inlet testing and parametrics were performed at NASA / Glenn Research Center (GRC) and NASA / Langley Research Center (LaRC) for both the Aerojet and Rocketdyne concepts. LaRC conducted an Air-Breathing Launch Vehicle (ABLV) study for several vehicle concepts with RBCC propulsion systems. LaRC is also performing a CFD analysis of the ramjet mode for both flowpaths based on GASL test conditions. A study was performed in 1999 to investigate the feasibility of performing an RBCC flight test on the NASA / Dryden Flight Research Center (DFRC) SR-71 aircraft. Academia involvement in the ART project includes parametric RBCC flowpath testing by Pennsylvania State University (PSU). In addition to thrust and wall static pressure measurements, PSU is also using laser diagnostics to analyze the flowfield in the test rig. MSFC is performing CFD analysis of the PSU rig at select test conditions for model baseline and validation. Also, Georgia Institute of Technology (GT) conducted a vision vehicle study using the Aerojet RBCC concept. Overall, the ART project has been very successful in advancing RBCC technology. Along the way, several major milestones were achieved and "firsts" accomplished. For example, under the ART project, the first dynamic trajectory simulation testing was performed and the Rocketdyne engine A5 logged over one hour of accumulated test time. The next logical step is to develop and demonstrate a flight-weight RBCC engine system.

  19. Evaluation of reformulated thermal control coatings in a simulated space environment. Part 1: YB-71

    NASA Technical Reports Server (NTRS)

    Cerbus, Clifford A.; Carlin, Patrick S.

    1994-01-01

    The Air Force Space and Missile Systems Center and Wright Laboratory Materials Directorate (WL/ML) have sponsored and effort to effort to reformulate and qualify Illinois Institute of Technology Research Institute (IITRI) spacecraft thermal control coatings. S13G/LO-1, Z93, and YB-71 coatings were reformulated because the potassium silicate binder, Sylvania PS-7, used in the coatings is no longer manufactured. Coatings utilizing the binder's replacement candidate, Kasil 2130, manufactured by The Philadelphia Quartz (PQ) Corporation, Baltimore, Maryland, and undergoing testing at the Materials Directorate's Space Combined Effects Primary Test and Research Equipment (SCEPTRE) Facility operated by the University of Dayton Research Institute (UDRI). The simulated space environment consists of combined ultraviolet (UV) and electron exposure with in site specimen reflectance measurements. A brief description of the effort at IITRI, results and discussion from testing the reformulated YB-71 coating in SCEPTRE, and plans for further testing of reformulated Z93 and S13G/LO-1 are presented.

  20. Performance of the first short model 150 mm aperture Nb$$_3$$Sn Quadrupole MQXFS for the High- Luminosity LHC upgrade

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chlachidze, G.; et al.

    2016-08-30

    The US LHC Accelerator Research Program (LARP) and CERN combined their efforts in developing Nb3Sn magnets for the High-Luminosity LHC upgrade. The ultimate goal of this collaboration is to fabricate large aperture Nb3Sn quadrupoles for the LHC interaction regions (IR). These magnets will replace the present 70 mm aperture NbTi quadrupole triplets for expected increase of the LHC peak luminosity by a factor of 5. Over the past decade LARP successfully fabricated and tested short and long models of 90 mm and 120 mm aperture Nb3Sn quadrupoles. Recently the first short model of 150 mm diameter quadrupole MQXFS was builtmore » with coils fabricated both by the LARP and CERN. The magnet performance was tested at Fermilab’s vertical magnet test facility. This paper reports the test results, including the quench training at 1.9 K, ramp rate and temperature dependence studies.« less

  1. Commercial and Institutional Case Studies

    EPA Pesticide Factsheets

    Throughout the country, commercial and institutional (CI) building owners and facility managers are taking actions to reduce their water use, implementing many of the operations and maintenance, retrofit, and replacement projects.

  2. Solid Waste Assurance Program Implementation Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Irons, L.G.

    1995-06-19

    On June 6, 1995, a waiver to Hanford Site Solid Waste Acceptance Criteria, was approved by the US Department of Energy Richland Operations Office (RL) to replace the low-level, mixed, and transuranic (TRU) generator assessment programs with the Solid Waste Assurance Program (SWAP). This is associated with a waiver that was approved on March 16, 1995 to replace the Storage/Disposal Approval Record (SDAR) requirements with the Waste Specification System (WSS). This implementation plan and the SWAP applies to Solid Waste Disposal (SWD) functions, facilities, and personnel who perform waste acceptance, verification, receipt, and management functions of dangerous, radioactive, and mixedmore » waste from on- and off-site generators who ship to or within the Hanford Site for treatment, storage, and/or disposal (TSD) at SWD TSD facilities.« less

  3. Advanced servomanipulator remote maintenance demonstration

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bradley, E.C.; Ladd, L.D.

    1988-01-01

    The Fuel Recycle Division (FRD) of the Oak Ridge National Laboratory (ORNL) is developing remote maintenance systems for the Consolidated Fuel Reprocessing Program for applications in future nuclear fuel cycle facilities. The most recent development is the advanced servomanipulator (ASM), a digitally controlled, force-reflecting, dual-arm, master/slave servomanipulator. A unique feature of ASM is that the slave arms are remotely maintainable. The ASM slave arms are composed of modules, each of which is capable of being removed and replaced by another manipulator system. The intent of this test was to demonstrate that the ASM slave arms could be completely disassembled andmore » reassembled remotely. This remote maintenance demonstration was performed using the Remote Operations and Maintenance Demonstration (ROMD) facility model M-2 servomanipulator maintenance system. Maintenance of ASM was successfully demonstrated using the M-2 servomanipulator and special fixtures. Recommendations, generally applicable to other remotely maintained equipment, have been made for maintainability improvements. 3 refs., 5 figs.« less

  4. Fifteen Years of Operation at NASA's National Transonic Facility with the World's Largest Adjustable Speed Drive

    NASA Technical Reports Server (NTRS)

    Sydnor, George H.; Bhatia, Ram; Krattiger, Hansueli; Mylius, Justus; Schafer, D.

    2012-01-01

    In September 1995, a project was initiated to replace the existing drive line at NASA's most unique transonic wind tunnel, the National Transonic Facility (NTF), with a single 101 MW synchronous motor driven by a Load Commutated Inverter (LCI). This Adjustable Speed Drive (ASD) system also included a custom four-winding transformer, harmonic filter, exciter, switch gear, control system, and feeder cable. The complete system requirements and design details have previously been presented and published [1], as well as the commissioning and acceptance test results [2]. The NTF was returned to service in December 1997 with the new drive system powering the fan. Today, this installation still represents the world s largest horizontal single motor/drive combination. This paper describes some significant events that occurred with the drive system during the first 15 years of service. These noteworthy issues are analyzed and root causes presented. Improvements that have substantially increased the long term viability of the system are given.

  5. Implementation of a spark plasma sintering facility in a hermetic glovebox for compaction of toxic, radiotoxic, and air sensitive materials

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tyrpekl, V., E-mail: vaclav.tyrpekl@ec.europa.eu, E-mail: vaclav.tyrpekl@gmail.com; Berkmann, C.; Holzhäuser, M.

    Spark plasma sintering (SPS) is a rapidly developing method for densification of powders into compacts. It belongs to the so-called “field assisted sintering techniques” that enable rapid sintering at much lower temperatures than the classical approaches of pressureless sintering of green pellets or hot isostatic pressing. In this paper, we report the successful integration of a SPS device into a hermetic glovebox for the handling of highly radioactive material containing radioisotopes of U, Th, Pu, Np, and Am. The glovebox implantation has been facilitated by the replacement of the hydraulic system to apply pressure with a compact electromechanical unit. Themore » facility has been successfully tested using UO{sub 2} powder. Pellets with 97% of the theoretical density were obtained at 1000 °C for 5 min, significantly lower than the ∼1600 °C for 5-10 h used in conventional pellet sintering.« less

  6. Standard operating procedures (SOPs): reason for, types of, adequacy, approval, and deviations from and revisions to.

    PubMed

    Isaman, V; Thelin, R

    1995-09-01

    Standard Operating Procedures (SOPs) are required in order to comply with the Good Laboratory Practice Standards (GLPS) as promulgated in the Federal Insecticide, Fungicide and Rodenticide Act (FIFRA) 40 CFR Part 160. Paragraph 160.81 (a) states: "A testing facility shall have standard operating procedures in writing setting forth study methods that management is satisfied are adequate to insure the quality and integrity of the data generated in the course of a study." Types of SOPs include administrative and personnel, analyses, substances, quality assurance and records, test system, equipment, and field related. All SOPs must be adequate in scope to describe the function in sufficient detail such that the study data are reproducible. All SOPs must be approved by a management level as described in a corporate organization chart. Signatures for SOP responsibility, authorship, and Quality Assurance review adds strength and accountability to the SOP. In the event a procedure or method is performed differently from what is stated in the SOP, an SOP deviation is necessary. As methods and procedures are improved, SOP revisions are necessary to maintain SOP adequacy and applicability. The replaced SOP is put into a historical SOP file and all copies of the replaced SOPs are destroyed.

  7. Audit Report, "Fire Protection Deficiencies at Los Alamos National Laboratory"

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2009-06-01

    The Department of Energy's Los Alamos National Laboratory (Los Alamos) maintains some of the Nation's most important national security assets, including nuclear materials. Many of Los Alamos' facilities are located in close proximity to one another, are occupied by large numbers of contract and Federal employees, and support activities ranging from nuclear weapons design to science-related activities. Safeguarding against fires, regardless of origin, is essential to protecting employees, surrounding communities, and national security assets. On June 1, 2006, Los Alamos National Security, LLC (LANS), became the managing and operating contractor for Los Alamos, under contract with the Department's National Nuclearmore » Security Administration (NNSA). In preparation for assuming its management responsibilities at Los Alamos, LANS conducted walk-downs of the Laboratory's facilities to identify pre-existing deficiencies that could give rise to liability, obligation, loss or damage. The walk-downs, which identified 812 pre-existing fire protection deficiencies, were conducted by subject matter professionals, including fire protection experts. While the Los Alamos Site Office has overall responsibility for the effectiveness of the fire protection program, LANS, as the Laboratory's operating contractor, has a major, day-to-day role in minimizing fire-related risks. The issue of fire protection at Los Alamos is more than theoretical. In May 2000, the 'Cerro Grande' fire burned about 43,000 acres, including 7,700 acres of Laboratory property. Due to the risk posed by fire to the Laboratory's facilities, workforce, and surrounding communities, we initiated this audit to determine whether pre-existing fire protection deficiencies had been addressed. Our review disclosed that LANS had not resolved many of the fire protection deficiencies that had been identified in early 2006: (1) Of the 296 pre-existing deficiencies we selected for audit, 174 (59 percent) had not been corrected; and, (2) A substantial portion of the uncorrected deficiencies, 86 (49 percent) were considered by the walk-down teams to be significant enough to warrant compensatory actions until the deficiency was corrected or was tracked to closure through implementation of corrective actions. Further, we found that 32 of the significant deficiencies had been closed by the previous Los Alamos contractor, prior to LANS assuming responsibility for operation of the Laboratory, even though the deficiencies had not been corrected. A fire protection expert provided technical support during the audit. As an example of uncorrected problems, LANS had not resolved, by performing periodic tests, a deficiency identified in 2006 regarding a kitchen hood fire suppression system in a facility located within the Los Alamos Neutron Science Center. Such systems are required to be tested twice a year by the National Fire Protection Association standard, a standard that had been adopted by Department of Energy under DOE Order 420.1B. Yet, in 2006, the LANS walk-down team recognized that this system had not been inspected since May 2004 and noted that deficient suppression systems could result in significantly high levels of property damage and loss. After we brought this issue to management's attention on February 6, 2009, LANS officials stated that the Laboratory would correct this deficiency. As with the problems involving the fire suppression system, we observed that LANS had not always corrected life safety deficiencies involving building exits at one of its primary facilities. This included providing a secondary emergency exit for a building with occupants on multiple floor levels. LANS had removed personnel from the third floor and improved the sprinkler system of the facility, but it had still not provided a secondary exit for personnel on the second floor by the time we completed our review. NNSA has since stated that this fire protection issue will be completely addressed by relocating personnel from the second floor. Perhaps most serious, our testing revealed that a number of deficiencies were formally closed even though actual corrective action had not been completed. Notably, we observed that action had not been taken to resolve a recommendation to replace a fire alarm panel found to be unreliable. After the walk-down was conducted but prior to contract transition, the former contractor closed the recommendation in its action tracking database even though the panel had not been replaced. The walk-down team had categorized the fire alarm system as requiring replacement since it had been modified many times, was old and obsolete, and had very limited available spare parts. In fact, the walk-down team concluded that the panel 'must be considered to be unreliable and should have a very high priority for replacement'.« less

  8. Laboratory instrumentation modernization at the WPI Nuclear Reactor Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1995-01-01

    With partial funding from the Department of Energy (DOE) University Reactor Instrumentation Program several laboratory instruments utilized by students and researchers at the WPI Nuclear Reactor Facility have been upgraded or replaced. Designed and built by General Electric in 1959, the open pool nuclear training reactor at WPI was one of the first such facilities in the nation located on a university campus. Devoted to undergraduate use, the reactor and its related facilities have been since used to train two generations of nuclear engineers and scientists for the nuclear industry. The low power output of the reactor and an ergonomicmore » facility design make it an ideal tool for undergraduate nuclear engineering education and other training. The reactor, its control system, and the associate laboratory equipment are all located in the same room. Over the years, several important milestones have taken place at the WPI reactor. In 1969, the reactor power level was upgraded from 1 kW to 10 kW. The reactor`s Nuclear Regulatory Commission operating license was renewed for 20 years in 1983. In 1988, under DOE Grant No. DE-FG07-86ER75271, the reactor was converted to low-enriched uranium fuel. In 1992, again with partial funding from DOE (Grant No. DE-FG02-90ER12982), the original control console was replaced.« less

  9. The Australian Replacement Research Reactor

    NASA Astrophysics Data System (ADS)

    Kennedy, Shane; Robinson, Robert

    2004-03-01

    The 20-MW Australian Replacement Research Reactor represents possibly the greatest single research infrastructure investment in Australia's history. Construction of the facility has commenced, following award of the construction contract in July 2000, and the construction licence in April 2002. The project includes a large state-of-the-art liquid deuterium cold-neutron source and supermirror guides feeding a large modern guide hall, in which most of the instruments are placed. Alongside the guide hall, there is good provision of laboratory, office and space for support activities. While the facility has "space" for up to 18 instruments, the project has funding for an initial set of 8 instruments, which will be ready when the reactor is fully operational in July 2006. Instrument performance will be competitive with the best research-reactor facilities anywhere, and our goal is to be in the top 3 such facilities worldwide. Staff to lead the design effort and man these instruments have been hired on the international market from leading overseas facilities, and from within Australia, and 7 out of 8 instruments have been specified and costed. At present the instrumentation project carries 10contingency. An extensive dialogue has taken place with the domestic user community and our international peers, via various means including a series of workshops over the last 2 years covering all 8 instruments, emerging areas of application like biology and the earth sciences, and computing infrastructure for the instruments.

  10. 46 CFR 56.97-35 - Pneumatic tests (replaces 137.5).

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 2 2012-10-01 2012-10-01 false Pneumatic tests (replaces 137.5). 56.97-35 Section 56.97-35 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PIPING SYSTEMS AND APPURTENANCES Pressure Tests § 56.97-35 Pneumatic tests (replaces 137.5). (a) General Requirements. When a pneumatic test is performed, it...

  11. Kuipers replaces the ESEM-1 with new ESEM in the U.S. Laboratory

    NASA Image and Video Library

    2011-12-28

    ISS030-E-033367 (28 Dec. 2011) --- In the International Space Station?s Destiny laboratory, European Space Agency astronaut Andre Kuipers, Expedition 30 flight engineer, replaces the faulty Exchangeable Standard Electronic Module 1 (ESEM-1) behind the front panel of the Microgravity Science Glovebox Remote Power Distribution Assembly (MSG RPDA) with the new spare. The ESEM is used to distribute station main power to the entire MSG facility.

  12. 340 Facility secondary containment and leak detection

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bendixsen, R.B.

    1995-01-31

    This document presents a preliminary safety evaluation for the 340 Facility Secondary Containment and Leak Containment system, Project W-302. Project W-302 will construct Building 340-C which has been designed to replace the current 340 Building and vault tank system for collection of liquid wastes from the Pacific Northwest Laboratory buildings in the 300 Area. This new nuclear facility is Hazard Category 3. The vault tank and related monitoring and control equipment are Safety Class 2 with the remainder of the structure, systems and components as Safety Class 3 or 4.

  13. PEROXIDE DESTRUCTION TESTING FOR THE 200 AREA EFFLUENT TREATMENT FACILITY

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    HALGREN DL

    2010-03-12

    The hydrogen peroxide decomposer columns at the 200 Area Effluent Treatment Facility (ETF) have been taken out of service due to ongoing problems with particulate fines and poor destruction performance from the granular activated carbon (GAC) used in the columns. An alternative search was initiated and led to bench scale testing and then pilot scale testing. Based on the bench scale testing three manganese dioxide based catalysts were evaluated in the peroxide destruction pilot column installed at the 300 Area Treated Effluent Disposal Facility. The ten inch diameter, nine foot tall, clear polyvinyl chloride (PVC) column allowed for the samemore » six foot catalyst bed depth as is in the existing ETF system. The flow rate to the column was controlled to evaluate the performance at the same superficial velocity (gpm/ft{sup 2}) as the full scale design flow and normal process flow. Each catalyst was evaluated on peroxide destruction performance and particulate fines capacity and carryover. Peroxide destruction was measured by hydrogen peroxide concentration analysis of samples taken before and after the column. The presence of fines in the column headspace and the discharge from carryover was generally assessed by visual observation. All three catalysts met the peroxide destruction criteria by achieving hydrogen peroxide discharge concentrations of less than 0.5 mg/L at the design flow with inlet peroxide concentrations greater than 100 mg/L. The Sud-Chemie T-2525 catalyst was markedly better in the minimization of fines and particle carryover. It is anticipated the T-2525 can be installed as a direct replacement for the GAC in the peroxide decomposer columns. Based on the results of the peroxide method development work the recommendation is to purchase the T-2525 catalyst and initially load one of the ETF decomposer columns for full scale testing.« less

  14. The Fast-spectrum Transmutation Experimental Facility FASTEF: Main design achievements (part 2: Reactor building design and plant layout) within the FP7-CDT collaborative project of the European Commission

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    De Bruyn, D.; Engelen, J.; Ortega, A.

    MYRRHA (Multi-purpose hybrid Research Reactor for High-tech Applications) is the flexible experimental accelerator-driven system (ADS) in development at SCK-CEN in replacement of its material testing reactor BR2. SCK-CEN in association with 17 European partners from industry, research centres and academia, responded to the FP7 (Seventh Framework Programme) call from the European Commission to establish a Central Design Team (CDT) for the design of a Fast Spectrum Transmutation Experimental Facility (FASTEF) able to demonstrate efficient transmutation and associated technology through a system working in subcritical and/or critical mode. The project has started on April 01, 2009 for a period of threemore » years. In this paper, we present the latest concept of the reactor building and the plant layout. The FASTEF facility has evolved quite a lot since the intermediate reporting done at the ICAPP'10 and ICAPP'11 conferences 1,2. Many iterations have been performed to take into account the safety requirements. The present configuration enables an easy operation and maintenance of the facility, including the possibility to change large components of the reactor. In a companion paper 3, we present the latest configuration of the reactor core and primary system. (authors)« less

  15. Commercial Toilets

    EPA Pesticide Factsheets

    Whether you are looking to reduce water use in a new facility or replace old, inefficient toilets in commercial restrooms, a WaterSense labeled flushometer-valve toilet is a high-performance, water-efficient option worth considering.

  16. Replacing natural wetlands with stormwater management facilities: Biophysical and perceived social values.

    PubMed

    Rooney, R C; Foote, L; Krogman, N; Pattison, J K; Wilson, M J; Bayley, S E

    2015-04-15

    Urban expansion replaces wetlands of natural origin with artificial stormwater management facilities. The literature suggests that efforts to mimic natural wetlands in the design of stormwater facilities can expand the provision of ecosystem services. Policy developments seek to capitalize on these improvements, encouraging developers to build stormwater wetlands in place of stormwater ponds; however, few have compared the biophysical values and social perceptions of these created wetlands to those of the natural wetlands they are replacing. We compared four types of wetlands: natural references sites, natural wetlands impacted by agriculture, created stormwater wetlands, and created stormwater ponds. We anticipated that they would exhibit a gradient in biodiversity, ecological integrity, chemical and hydrologic stress. We further anticipated that perceived values would mirror measured biophysical values. We found higher biophysical values associated with wetlands of natural origin (both reference and agriculturally impacted). The biophysical values of stormwater wetlands and stormwater ponds were lower and indistinguishable from one another. The perceived wetland values assessed by the public differed from the observed biophysical values. This has important policy implications, as the public are not likely to perceive the loss of values associated with the replacement of natural wetlands with created stormwater management facilities. We conclude that 1) agriculturally impacted wetlands provide biophysical values equivalent to those of natural wetlands, meaning that land use alone is not a great predictor of wetland value; 2) stormwater wetlands are not a substantive improvement over stormwater ponds, relative to wetlands of natural origin; 3) stormwater wetlands are poor mimics of natural wetlands, likely due to fundamental distinctions in terms of basin morphology, temporal variation in hydrology, ground water connectivity, and landscape position; 4) these drivers are relatively fixed, thus, once constructed, it may not be possible to modify them to improve provision of biophysical values; 5) these fixed drivers are not well perceived by the public and thus public perception may not capture the true value of natural wetlands, including those impacted by agriculture. Copyright © 2014 Elsevier Ltd. All rights reserved.

  17. Intensive Hemodialysis and Mortality Risk in Australian and New Zealand Populations.

    PubMed

    Marshall, Mark R; Polkinghorne, Kevan R; Kerr, Peter G; Hawley, Carmel M; Agar, John W M; McDonald, Stephen P

    2016-04-01

    Intensive hemodialysis (HD) is characterized by increased frequency and/or session length compared to conventional HD. Previous analyses from Australia and New Zealand did not suggest benefit with intensive HD, although recent research suggests that relationships have changed. We present updated analyses. Observational cohort study using marginal structural modeling to adjust for changes in renal replacement modality and time-varying medical comorbid conditions. Adults initiating renal replacement therapy since March 31, 1996, followed up through December 31, 2012; this analysis included 40,842 patients over 2,187,689 patient-months. Time-varying renal replacement modality: conventional facility HD (≤3 times per week, ≤6 hours per session), quasi-intensive facility HD (between conventional and intensive), intensive facility HD (≥5 times per week, any hours per session), conventional home HD, quasi-intensive home HD, intensive home HD, peritoneal dialysis, deceased donor kidney transplantation, and living donor kidney transplantation. Patient mortality, with a 3-month lag in primary analyses and 6- and 12-month lags in sensitivity analyses. Conventional facility HD was the reference group. Conventional home HD had a similar mortality risk. For quasi-intensive home HD, mortality risk was lower (HR, 0.56; 95% CI, 0.44-0.73). For intensive home HD, mortality risk was nonsignificantly lower in primary analyses and significantly lower using a 6-month lag (HR, 0.41; 95% CI, 0.20-0.85), but not using a 12-month lag. For quasi-intensive facility HD, mortality risk was nonsignificantly lower in primary analyses, although significantly lower using 6- (HR, 0.41; 95% CI, 0.20-0.85) and 12-month lags (HR, 0.59; 95% CI, 0.44-0.80). Mortality risk was similar between intensive and conventional facility HD. For peritoneal dialysis, mortality risk was greater than for conventional facility HD (HR, 1.07; 95% CI, 1.03-1.12). Kidney transplantation had the lowest mortality risk. Potential residual confounding from limited collection of comorbid condition, socioeconomic, and medication data. There is an emerging HD dose-effect in Australia and New Zealand, with lower mortality risks associated with some of the more intensive HD regimens in these countries. Copyright © 2016 National Kidney Foundation, Inc. Published by Elsevier Inc. All rights reserved.

  18. DEVELOPMENT OF REMOTE HANFORD CONNECTOR GASKET REPLACEMENT TOOLING FOR DWPF

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Krementz, D.; Coughlin, Jeffrey

    2009-05-05

    The Defense Waste Processing Facility (DWPF) requested the Savannah River National Laboratory (SRNL) to develop tooling and equipment to remotely replace gaskets in mechanical Hanford connectors to reduce personnel radiation exposure as compared to the current hands-on method. It is also expected that radiation levels will continually increase with future waste streams. The equipment is operated in the Remote Equipment Decontamination Cell (REDC), which is equipped with compressed air, two master-slave manipulators (MSM's) and an electro-mechanical manipulator (EMM) arm for operation of the remote tools. The REDC does not provide access to electrical power, so the equipment must be manuallymore » or pneumatically operated. The MSM's have a load limit at full extension of ten pounds, which limited the weight of the installation tool. In order to remotely replace Hanford connector gaskets several operations must be performed remotely, these include: removal of the spent gasket and retaining ring (retaining ring is also called snap ring), loading the new snap ring and gasket into the installation tool and installation of the new gasket into the Hanford connector. SRNL developed and tested tools that successfully perform all of the necessary tasks. Removal of snap rings from horizontal and vertical connectors is performed by separate air actuated retaining ring removal tools and is manipulated in the cell by the MSM. In order install a new gasket, the snap ring loader is used to load a new snap ring into a groove in the gasket installation tool. A new gasket is placed on the installation tool and retained by custom springs. An MSM lifts the installation tool and presses the mounted gasket against the connector block. Once the installation tool is in position, the gasket and snap ring are installed onto the connector by pneumatic actuation. All of the tools are located on a custom work table with a pneumatic valve station that directs compressed air to the desired tool and vents the tools as needed. Extensive testing of tooling operation was performed in the DWPF manipulator repair shop. This testing allowed the operators to gain confidence before the equipment was exposed to radioactive contamination. The testing also led to multiple design improvements. On July 17 and 29, 2008 the Remote Gasket Replacement Tooling was successfully demonstrated in the REDC at the DWPF of The Savannah River Site.« less

  19. KSC-2009-1939

    NASA Image and Video Library

    2009-03-03

    CAPE CANAVERAL, Fla. – In the Astrotech payload processing facility in Titusville, Fla., the latest Geostationary Operational Environmental Satellite, or GOES, is lowered onto the floor. Developed by NASA for the National Oceanic and Atmospheric Administration, or NOAA, the GOES-O satellite is targeted to launch April 28 onboard a United Launch Alliance Delta IV expendable launch vehicle. Once in orbit, GOES-O will be designated GOES-14, and NASA will provide on-orbit checkout and then transfer operational responsibility to NOAA. GOES-O will be placed in on-orbit storage as a replacement for an older GOES satellite. The satellite will undergo final testing of the imaging system, instrumentation, communications and power systems. Photo credit: NASA/Kim Shiflett

  20. KSC-2009-1938

    NASA Image and Video Library

    2009-03-03

    CAPE CANAVERAL, Fla. – The latest Geostationary Operational Environmental Satellite, or GOES, is lifted from the transporter and moved into the Astrotech payload processing facility in Titusville, Fla. Developed by NASA for the National Oceanic and Atmospheric Administration, or NOAA, the GOES-O satellite is targeted to launch April 28 onboard a United Launch Alliance Delta IV expendable launch vehicle. Once in orbit, GOES-O will be designated GOES-14, and NASA will provide on-orbit checkout and then transfer operational responsibility to NOAA. GOES-O will be placed in on-orbit storage as a replacement for an older GOES satellite. The satellite will undergo final testing of the imaging system, instrumentation, communications and power systems. Photo credit: NASA/Kim Shiflett

  1. The automation of an inlet mass flow control system

    NASA Technical Reports Server (NTRS)

    Supplee, Frank; Tcheng, Ping; Weisenborn, Michael

    1989-01-01

    The automation of a closed-loop computer controlled system for the inlet mass flow system (IMFS) developed for a wind tunnel facility at Langley Research Center is presented. This new PC based control system is intended to replace the manual control system presently in use in order to fully automate the plug positioning of the IMFS during wind tunnel testing. Provision is also made for communication between the PC and a host-computer in order to allow total animation of the plug positioning and data acquisition during the complete sequence of predetermined plug locations. As extensive running time is programmed for the IMFS, this new automated system will save both manpower and tunnel running time.

  2. KSC-02pd0027

    NASA Image and Video Library

    2002-01-17

    KENNEDY SPACE CENTER, FLA. -- Workers in the Vertical Processing Facility look over the Near Infrared Camera and Multi-Object Spectrometer (NICMOS) Cooling System, part of the payload on mission STS-109, the Hubble Servicing Telescope Mission. NICMOS is a new experimental cooling system consisting of a compressor and tiny turbines. With the experimental cryogenic system, NASA hopes to re-cool the infrared detectors to below -315 degrees F (-193 degrees Celsius). NICMOS II was previously tested aboard STS-95 in 1998. It could extend the life of the Hubble Space Telescope by several years. Astronauts aboard Columbia on mission STS-109 will be replacing the original NICMOS with the newer version. Launch of mission STS-109 is scheduled for Feb. 28, 2002

  3. Operation of a LAr-TPC equipped with a multilayer LEM charge readout

    NASA Astrophysics Data System (ADS)

    Baibussinov, B.; Centro, S.; Farnese, C.; Fava, A.; Gibin, D.; Guglielmi, A.; Meng, G.; Pietropaolo, F.; Varanini, F.; Ventura, S.; Zatrimaylov, K.

    2018-03-01

    A novel detector for ionization signals in a single phase LAr-TPC has been experimented in the ICARINO test facility at the INFN Laboratories in Legnaro. It is based on the adoption of a multilayer Large Electron Multiplier (LEM) replacing the traditional anodic wire arrays. Cosmic muon tracks were detected allowing the measurement of energy deposition and a first determination of the signal to noise ratio. The analysis of the recorded events demonstrated the 3D reconstruction capability of this device for ionizing events in liquid Argon. The collected fraction of ionization charge is close to about 90%, with signal to noise ratio similar to that measured with more traditional wire chambers.

  4. A microprocessor based anti-aliasing filter for a PCM system

    NASA Technical Reports Server (NTRS)

    Morrow, D. C.; Sandlin, D. R.

    1984-01-01

    Described is the design and evaluation of a microprocessor based digital filter. The filter was made to investigate the feasibility of a digital replacement for the analog pre-sampling filters used in telemetry systems at the NASA Ames-Dryden Flight Research Facility (DFRF). The digital filter will utilize an Intel 2920 Analog Signal Processor (ASP) chip. Testing includes measurements of: (1) the filter frequency response and, (2) the filter signal resolution. The evaluation of the digital filter was made on the basis of circuit size, projected environmental stability and filter resolution. The 2920 based digital filter was found to meet or exceed the pre-sampling filter specifications for limited signal resolution applications.

  5. KSC-07pd3565

    NASA Image and Video Library

    2007-11-30

    KENNEDY SPACE CENTER, FLA. -- In the Orbiter Processing Facility, STS-123 crew members are lowered into space shuttle Endeavour's payload bay to check out the equipment. At right is Mission Specialist Garrett Reisman; at left is Mission Specialist Takao Doi. The crew is at NASA's Kennedy Space Center for a crew equipment interface test, a process of familiarization with payloads, hardware and the space shuttle. Doi represents the Japanese Aerospace and Exploration Agency. Reisman will join the Expedition 16 crew on the International Space Station, replacing flight engineer Leopold Eyharts. The STS-123 mission is targeted for launch on space shuttle Endeavour on Feb. 14. It will be the 25th assembly flight of the station. Photo credit: NASA/Kim Shiflett

  6. KSC-07pd3566

    NASA Image and Video Library

    2007-11-30

    KENNEDY SPACE CENTER, FLA. -- In the Orbiter Processing Facility, STS-123 crew members are lowered into space shuttle Endeavour's payload bay to check out the equipment. At right is Mission Specialist Garrett Reisman; at left is Mission Specialist Takao Doi. The crew is at NASA's Kennedy Space Center for a crew equipment interface test, a process of familiarization with payloads, hardware and the space shuttle. Doi represents the Japanese Aerospace and Exploration Agency. Reisman will join the Expedition 16 crew on the International Space Station, replacing flight engineer Leopold Eyharts. The STS-123 mission is targeted for launch on space shuttle Endeavour on Feb. 14. It will be the 25th assembly flight of the station. Photo credit: NASA/Kim Shiflett

  7. STS-82 Discovery payloads being integrated in VPF

    NASA Image and Video Library

    1997-01-30

    KENNEDY SPACE CENTER, FLORIDA STS-82 PREPARATIONS VIEW --- Payload processing workers in the Kennedy Space Center (KSC) Vertical Processing Facility (VPF) prepare to integrate the Space Telescope Imaging Spectrograph (STIS), suspended at center, into the Orbiter Replacement Unit (ORU) Carrier and Scientific Instrument Protective Enclosure (SIPE). STIS will replace the Goddard High Resolution Spectrograph (GHRS) on the Hubble Space Telescope (HST). Four of the seven STS-82 crew members will perform a series of spacewalks to replace two scientific instruments with two new instruments, including STIS, and perform other tasks during the second HST servicing mission. HST was deployed nearly seven years ago and was initially serviced in 1993.

  8. Coherent Anti-Stokes Raman Scattering (CARS) as a Probe for Supersonic Hydrogen-Fuel/Air Mixing

    NASA Technical Reports Server (NTRS)

    Danehy, P. M.; O'Byrne, S.; Cutler, A. D.; Rodriguez, C. G.

    2003-01-01

    The dual-pump coherent anti-Stokes Raman spectroscopy (CARS) method was used to measure temperature and the absolute mole fractions of N2, O2 and H2 in a supersonic non-reacting fuel-air mixing experiment. Experiments were conducted in NASA Langley Research Center s Direct Connect Supersonic Combustion Test Facility. Under normal operation of this facility, hydrogen and air burn to increase the enthalpy of the test gas and O2 is added to simulate air. This gas is expanded through a Mach 2 nozzle and into a combustor model where fuel is then injected, mixes and burns. In the present experiment the O2 of the test gas is replaced by N2. The lack of oxidizer inhibited combustion of the injected H2 fuel jet allowing the fuel/air mixing process to be studied. CARS measurements were performed 427 mm downstream of the nozzle exit and 260 mm downstream of the fuel injector. Maps were obtained of the mean temperature, as well as the N2, O2 and H2 mean mole fraction fields. A map of mean H2O vapor mole fraction was also inferred from these measurements. Correlations between different measured parameters and their fluctuations are presented. The CARS measurements are compared with a preliminary computational prediction of the flow.

  9. Control console replacement at the WPI Reactor

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-01-01

    With partial funding from the Department of Energy (DOE) University Reactor Instrumentation Upgrade Program (DOE Grant No. DE-FG02-90ER12982), the original control console at the Worcester Polytechnic Institute (WPI) Reactor has been replaced with a modern system. The new console maintains the original design bases and functionality while utilizing current technology. An advanced remote monitoring system has been added to augment the educational capabilities of the reactor. Designed and built by General Electric in 1959, the open pool nuclear training reactor at WPI was one of the first such facilities in the nation located on a university campus. Devoted to undergraduatemore » use, the reactor and its related facilities have been since used to train two generations of nuclear engineers and scientists for the nuclear industry. The reactor power level was upgraded from 1 to 10 kill in 1969, and its operating license was renewed for 20 years in 1983. In 1988, the reactor was converted to low enriched uranium. The low power output of the reactor and ergonomic facility design make it an ideal tool for undergraduate nuclear engineering education and other training.« less

  10. Small wind turbine performance evaluation using field test data and a coupled aero-electro-mechanical model

    NASA Astrophysics Data System (ADS)

    Wallace, Brian D.

    A series of field tests and theoretical analyses were performed on various wind turbine rotor designs at two Penn State residential-scale wind-electric facilities. This work involved the prediction and experimental measurement of the electrical and aerodynamic performance of three wind turbines; a 3 kW rated Whisper 175, 2.4 kW rated Skystream 3.7, and the Penn State designed Carolus wind turbine. Both the Skystream and Whisper 175 wind turbines are OEM blades which were originally installed at the facilities. The Carolus rotor is a carbon-fiber composite 2-bladed machine, designed and assembled at Penn State, with the intent of replacing the Whisper 175 rotor at the off-grid system. Rotor aerodynamic performance is modeled using WT_Perf, a National Renewable Energy Laboratory developed Blade Element Momentum theory based performance prediction code. Steady-state power curves are predicted by coupling experimentally determined electrical characteristics with the aerodynamic performance of the rotor simulated with WT_Perf. A dynamometer test stand is used to establish the electromechanical efficiencies of the wind-electric system generator. Through the coupling of WT_Perf and dynamometer test results, an aero-electro-mechanical analysis procedure is developed and provides accurate predictions of wind system performance. The analysis of three different wind turbines gives a comprehensive assessment of the capability of the field test facilities and the accuracy of aero-electro-mechanical analysis procedures. Results from this study show that the Carolus and Whisper 175 rotors are running at higher tip-speed ratios than are optimum for power production. The aero-electro-mechanical analysis predicted the high operating tip-speed ratios of the rotors and was accurate at predicting output power for the systems. It is shown that the wind turbines operate at high tip-speeds because of a miss-match between the aerodynamic drive torque and the operating torque of the wind-system generator. Through the change of load impedance on the wind generator, the research facility has the ability to modify the rotational speed of the wind turbines, allowing the rotors to perform closer to their optimum tip-speed. Comparisons between field test data and performance predictions show that the aero-electro-mechanical analysis was able to predict differences in power production and rotational speed which result from changes in the system load impedance.

  11. Army Corrosion Prevention and Control (CPC) Program for Facilities and Infrastructure

    DTIC Science & Technology

    2010-02-01

    FY2009 - 2011 • Benefits: Reduced corrosion due to elimination of metallic rebar , reduced weight equates to reduced dead load and increased dynamic...Decks as Replacement for Steel Reinforced Concrete Decks F09AR04: Corrosion Resistant Roofs with Integrated Sustainable PV Power Systems • Where...Army Corrosion Prevention and Control (CPC) Program for Facilities and Infrastructure Dr. Craig E. College Deputy Assistant Chief of Staff for

  12. 300 Area Building Retention Evaluation Mitigation Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    D. J. McBride

    2007-07-03

    Evaluate the long-term retention of several facilities associated with the PNNL Capability Replacement Laboratory and other Hanfor mission needs. WCH prepared a mitigation plan for three scenarios with different release dates for specific buildings. The evaluations present a proposed plan for providing utility services to retained facilities in support of a long-term (+20 year) lifespan in addition to temporary services to buildings with specified delayed release dates.

  13. Skilled nursing facilities after joint replacement

    MedlinePlus

    ... able to: Safely get around using a cane, walker, or crutches. Get in and out of a ... climb steps, keep your balance, and use a walker, cane, or crutches. Occupational therapists will teach you ...

  14. Utilities on the primary road system.

    DOT National Transportation Integrated Search

    1992-05-01

    This chapter covers initial placement, adjustment, improvement, relocation, replacement and maintenance of utility facilities in, on, above, or below the right-of-way of primary highways, including attachments to primary highway structures. It embodi...

  15. Delirium Research: Where Am I?

    MedlinePlus

    ... facility, he experienced shortness of breath and acute lower-extremity edema that resulted in a series of hospital ... had a serious fall and sustained multiple hip fractures that required emergency hip replacement surgery to repair. ...

  16. Early Implementation of Continuous Renal Replacement Therapy Optimizes Casualty Evacuation for Combat-Related Acute Kidney Injury

    DTIC Science & Technology

    2013-08-01

    were Acute Kidney Injury Network (AKIN) 3 and all developed critical hyperkalemia (mean [SD], peak K+ 6.4 [0.4]). The peak plasma creatinine ranged...related acid-base disorders, severe hyperkalemia , and metabolic disorders became apparent. Based on the mounting pressure and internal performance im...with severe hyperkalemia was the most common indication for renal replacement. Validation for critical care evacuation to the Role IV facility mandated a

  17. Thermal/Dynamic Characterization Test of the Solar Array Panel for Hubble Space Telescope

    NASA Technical Reports Server (NTRS)

    Jenkins, Kathleen; Hershfeld, Donald J.

    1999-01-01

    The Hubble Space Telescope has experienced a problem maintaining pointing accuracy during emergence of the spacecraft from the Earth's shadow. The problem has been attributed to the rapid thermal gradient that develops when the heat from the Sun strikes the cold solar arrays. The thermal gradient causes the solar arrays to deflect or bend and this motion is sufficient to disturb the pointing control system. In order to alleviate this problem, a new design for the solar arrays has been fabricated. These new solar arrays will replace the current solar arrays during a future Hubble servicing mission. The new solar arrays have been designed so that the effective net motion of the center of mass of each panel is essentially zero. Although the solar array thermal deflection problem has been studied extensively over a period of years, a full scale test of the actual flight panels was required in order to establish confidence in the analyses. This test was conducted in the JPL Solar Simulation Facility in April, 1999. This presentation will discuss the objectives and methods of the test and present some typical test data.

  18. Testing of an Integrated Reactor Core Simulator and Power Conversion System with Simulated Reactivity Feedback

    NASA Technical Reports Server (NTRS)

    Bragg-Sitton, Shannon M.; Hervol, David S.; Godfroy, Thomas J.

    2009-01-01

    A Direct Drive Gas-Cooled (DDG) reactor core simulator has been coupled to a Brayton Power Conversion Unit (BPCU) for integrated system testing at NASA Glenn Research Center (GRC) in Cleveland, OH. This is a closed-cycle system that incorporates an electrically heated reactor core module, turbo alternator, recuperator, and gas cooler. Nuclear fuel elements in the gas-cooled reactor design are replaced with electric resistance heaters to simulate the heat from nuclear fuel in the corresponding fast spectrum nuclear reactor. The thermodynamic transient behavior of the integrated system was the focus of this test series. In order to better mimic the integrated response of the nuclear-fueled system, a simulated reactivity feedback control loop was implemented. Core power was controlled by a point kinetics model in which the reactivity feedback was based on core temperature measurements; the neutron generation time and the temperature feedback coefficient are provided as model inputs. These dynamic system response tests demonstrate the overall capability of a non-nuclear test facility in assessing system integration issues and characterizing integrated system response times and response characteristics.

  19. Testing of an Integrated Reactor Core Simulator and Power Conversion System with Simulated Reactivity Feedback

    NASA Technical Reports Server (NTRS)

    Bragg-Sitton, Shannon M.; Hervol, David S.; Godfroy, Thomas J.

    2010-01-01

    A Direct Drive Gas-Cooled (DDG) reactor core simulator has been coupled to a Brayton Power Conversion Unit (BPCU) for integrated system testing at NASA Glenn Research Center (GRC) in Cleveland, Ohio. This is a closed-cycle system that incorporates an electrically heated reactor core module, turboalternator, recuperator, and gas cooler. Nuclear fuel elements in the gas-cooled reactor design are replaced with electric resistance heaters to simulate the heat from nuclear fuel in the corresponding fast spectrum nuclear reactor. The thermodynamic transient behavior of the integrated system was the focus of this test series. In order to better mimic the integrated response of the nuclear-fueled system, a simulated reactivity feedback control loop was implemented. Core power was controlled by a point kinetics model in which the reactivity feedback was based on core temperature measurements; the neutron generation time and the temperature feedback coefficient are provided as model inputs. These dynamic system response tests demonstrate the overall capability of a non-nuclear test facility in assessing system integration issues and characterizing integrated system response times and response characteristics.

  20. Beam test results of a monolithic pixel sensor in the 0.18 μm tower-jazz technology with high resistivity epitaxial layer

    NASA Astrophysics Data System (ADS)

    Mattiazzo, S.; Aimo, I.; Baudot, J.; Bedda, C.; La Rocca, P.; Perez, A.; Riggi, F.; Spiriti, E.

    2015-10-01

    The ALICE experiment at CERN will undergo a major upgrade in the second Long LHC Shutdown in the years 2018-2019; this upgrade includes the full replacement of the Inner Tracking System (ITS), deploying seven layers of Monolithic Active Pixel Sensors (MAPS). For the development of the new ALICE ITS, the Tower-Jazz 0.18 μm CMOS imaging sensor process has been chosen as it is possible to use full CMOS in the pixel and different silicon wafers (including high resistivity epitaxial layers). A large test campaign has been carried out on several small prototype chips, designed to optimize the pixel sensor layout and the front-end electronics. Results match the target requirements both in terms of performance and of radiation hardness. Following this development, the first full scale chips have been designed, submitted and are currently under test, with promising results. A telescope composed of 4 planes of Mimosa-28 and 2 planes of Mimosa-18 chips is under development at the DAFNE Beam Test Facility (BTF) at the INFN Laboratori Nazionali di Frascati (LNF) in Italy with the final goal to perform a comparative test of the full scale prototypes. The telescope has been recently used to test a Mimosa-22THRb chip (a monolithic pixel sensor built in the 0.18 μm Tower-Jazz process) and we foresee to perform tests on the full scale chips for the ALICE ITS upgrade at the beginning of 2015. In this contribution we will describe some first measurements of spatial resolution, fake hit rate and detection efficiency of the Mimosa-22THRb chip obtained at the BTF facility in June 2014 with an electron beam of 500 MeV.

  1. Evaluation of the prototype dual-axis wall attitude measurement sensor

    NASA Technical Reports Server (NTRS)

    Wong, Douglas T.

    1994-01-01

    A prototype dual-axis electrolytic tilt sensor package for angular position measurements was built and evaluated in a laboratory environment. The objective was to investigate the use of this package for making wind tunnel wall attitude measurements for the National Transonic Facility (NTF) at NASA Langley Research Center (LaRC). The instrumentation may replace an existing, more costly, and less rugged servo accelerometer package (angle-of-attack package) currently in use. The dual-axis electrolytic tilt sensor package contains two commercial electrolytic tilt sensors thermally insulated with NTF foam, all housed within a stainless steel package. The package is actively heated and maintained at 160 F using foil heating elements. The laboratory evaluation consisted of a series of tests to characterize the linearity, repeatability, cross-axis interaction, lead wire effect, step response, thermal time constant, and rectification errors. Tests revealed that the total RMS errors for the x-axis sensor is 0.084 degree, and 0.182 degree for the y-axis sensor. The RMS errors are greater than the 0.01 degree specification required for NTF wall attitude measurements. It is therefore not a viable replacement for the angle-of-attack package in the NTF application. However, with some physical modifications, it can be used as an inexpensive 5-degree range dual-axis inclinometer with overall accuracy approaching 0.01 degree under less harsh environments. Also, the data obtained from the tests can be valuable for wind tunnel applications of most types of electrolytic tilt sensors.

  2. Research and test facilities for development of technologies and experiments with commercial applications

    NASA Technical Reports Server (NTRS)

    1989-01-01

    One of NASA'S agency-wide goals is the commercial development of space. To further this goal NASA is implementing a policy whereby U.S. firms are encouraged to utilize NASA facilities to develop and test concepts having commercial potential. Goddard, in keeping with this policy, will make the facilities and capabilities described in this document available to private entities at a reduced cost and on a noninterference basis with internal NASA programs. Some of these facilities include: (1) the Vibration Test Facility; (2) the Battery Test Facility; (3) the Large Area Pulsed Solar Simulator Facility; (4) the High Voltage Testing Facility; (5) the Magnetic Field Component Test Facility; (6) the Spacecraft Magnetic Test Facility; (7) the High Capacity Centrifuge Facility; (8) the Acoustic Test Facility; (9) the Electromagnetic Interference Test Facility; (10) the Space Simulation Test Facility; (11) the Static/Dynamic Balance Facility; (12) the High Speed Centrifuge Facility; (13) the Optical Thin Film Deposition Facility; (14) the Gold Plating Facility; (15) the Paint Formulation and Application Laboratory; (16) the Propulsion Research Laboratory; (17) the Wallops Range Facility; (18) the Optical Instrument Assembly and Test Facility; (19) the Massively Parallel Processor Facility; (20) the X-Ray Diffraction and Scanning Auger Microscopy/Spectroscopy Laboratory; (21) the Parts Analysis Laboratory; (22) the Radiation Test Facility; (23) the Ainsworth Vacuum Balance Facility; (24) the Metallography Laboratory; (25) the Scanning Electron Microscope Laboratory; (26) the Organic Analysis Laboratory; (27) the Outgassing Test Facility; and (28) the Fatigue, Fracture Mechanics and Mechanical Testing Laboratory.

  3. Evaluation of Facility Management by Multivariate Statistics - Factor Analysis

    NASA Astrophysics Data System (ADS)

    Singovszki, Miloš; Vranayová, Zuzana

    2013-06-01

    Facility management is evolving, there is no exact than other sciences, although its development is fast forward. The knowledge and practical skills in facility management is not replaced, on the contrary, they complement each other. The existing low utilization of science in the field of facility management is mainly caused by the management of support activities are many variables and prevailing immediate reaction to the extraordinary situation arising from motives of those who have substantial experience and years of proven experience. Facility management is looking for a system that uses organized knowledge and will form the basis, which grows from a wide range of disciplines. Significant influence on its formation as a scientific discipline is the "structure, which follows strategy". The paper deals evaluate technology building as part of an facility management by multivariate statistic - factor analysis.

  4. 10 CFR 34.27 - Leak testing and replacement of sealed sources.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Leak testing and replacement of sealed sources. 34.27 Section 34.27 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Equipment § 34.27 Leak testing and replacement...

  5. 10 CFR 34.27 - Leak testing and replacement of sealed sources.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Leak testing and replacement of sealed sources. 34.27 Section 34.27 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Equipment § 34.27 Leak testing and replacement...

  6. 10 CFR 34.27 - Leak testing and replacement of sealed sources.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Leak testing and replacement of sealed sources. 34.27 Section 34.27 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Equipment § 34.27 Leak testing and replacement...

  7. 10 CFR 34.27 - Leak testing and replacement of sealed sources.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Leak testing and replacement of sealed sources. 34.27 Section 34.27 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Equipment § 34.27 Leak testing and replacement...

  8. 10 CFR 34.27 - Leak testing and replacement of sealed sources.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false Leak testing and replacement of sealed sources. 34.27 Section 34.27 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Equipment § 34.27 Leak testing and replacement...

  9. Artificial Neural Network Test Support Development for the Space Shuttle PRCS Thrusters

    NASA Technical Reports Server (NTRS)

    Lehr, Mark E.

    2005-01-01

    A significant anomaly, Fuel Valve Pilot Seal Extrusion, is affecting the Shuttle Primary Reaction Control System (PRCS) Thrusters, and has caused 79 to fail. To help address this problem, a Shuttle PRCS Thruster Process Evaluation Team (TPET) was formed. The White Sands Test Facility (WSTF) and Boeing members of the TPET have identified many discrete valve current trace characteristics that are predictive of the problem. However, these are difficult and time consuming to identify and trend by manual analysis. Based on this exhaustive analysis over months, 22 thrusters previously delivered by the Depot were identified as high risk for flight failures. Although these had only recently been installed, they had to be removed from Shuttles OV103 and OV104 for reprocessing, by directive of the Shuttle Project Office. The resulting impact of the thruster removal, replacement, and valve replacement was significant (months of work and hundreds of thousands of dollars). Much of this could have been saved had the proposed Neural Network (NN) tool described in this paper been in place. In addition to the significant benefits to the Shuttle indicated above, the development and implementation of this type of testing will be the genesis for potential Quality improvements across many areas of WSTF test data analysis and will be shared with other NASA centers. Future tests can be designed to incorporate engineering experience via Artificial Neural Nets (ANN) into depot level acceptance of hardware. Additionally, results were shared with a NASA Engineering and Safety Center (NESC) Super Problem Response Team (SPRT). There was extensive interest voiced among many different personnel from several centers. There are potential spin-offs of this effort that can be directly applied to other data acquisition systems as well as vehicle health management for current and future flight vehicles.

  10. Private capital investments in health care provision through mergers and acquisitions: from long-term to acute care.

    PubMed

    Angeli, Federica; Maarse, Hans

    2016-10-01

    This work aims to test whether different segments of healthcare provision differentially attract private capital and thus offer heterogeneous opportunities for private investors' diversification strategies. Thomson Reuter's SDC Platinum database provided data on 2563 merger and acquisition (M&A) deals targeting healthcare providers in Western Europe between 1990 and 2010. Longitudinal trends of industrial and geographical characteristics of M&As' targets and acquirers are examined. Our analyses highlight: (i) a relative decrease of long-term care facilities as targets of M&As, replaced by an increasing prominence of general hospitals, (ii) a shrinking share of long-term care facilities as targets of financial service organizations' acquisitions, in favor of general hospitals, and (iii) an absolute and relative decrease of long-term care facilities' role as target of cross-border M&As. We explain the decreasing interest of private investors towards long-term care facilities along three lines of reasoning, which take into account the saturation of the long-term care market and the liberalization of acute care provision across Western European countries, regulatory interventions aimed at reducing private ownership to ensure resident outcomes and new cultural developments in favor of small-sized facilities, which strengthen the fragmentation of the sector. These findings advance the literature investigating the effect of private ownership on health outcomes in long-term facilities. Market, policy and cultural forces have emerged over two decades to jointly regulate the presence of privately owned, large-sized long-term care providers, seemingly contributing to safeguard residents' well-being. Copyright © 2016 John Wiley & Sons, Ltd. Copyright © 2016 John Wiley & Sons, Ltd.

  11. STS-103 crew take part in CEIT

    NASA Technical Reports Server (NTRS)

    1999-01-01

    In the Payload Hazardous Servicing Facility, STS-103 Mission Specialist Steven L. Smith (right) and other members of the crew look over new Multi-Layer Insulation (MLI) intended for the Hubble Space Telescope. The seven-member crew, taking part in a Crew Equipment Interface Test, are Commander Curtis L. Brown Jr., Pilot Scott J. Kelly, and Mission Specialists Smith, C. Michael Foale (Ph.D.), John M. Grunsfeld (Ph.D.), Claude Nicollier of Switzerland, and Jean-Frangois Clervoy of France. Nicollier and Clervoy are with the European Space Agency. Mission STS-103 is a 'call-up' due to the need to replace portions of the pointing system, the gyros, which have begun to fail on the Hubble Space Telescope. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with the MLI. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. The scheduled launch date in October is under review.

  12. Hubble (HST) hardware arrives at KSC for servicing mission, STS-103

    NASA Technical Reports Server (NTRS)

    1999-01-01

    A shipping container with payload flight hardware for the Third Hubble Space Telescope Servicing Mission (SM-3A) is transferred onto a transporter from the C-5 air cargo plane that brought it to KSC. The hardware will be taken to the Payload Hazardous Servicing Facility for final testing and integration of payload elements. Mission STS-103 is a 'call-up' mission which is being planned due to the need to replace portions of the Hubble's pointing system, the gyros, which have begun to fail. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. Launch of STS-93 is currently targeted for Oct. 14 but under review, pending the launch date of a prior mission, STS-99, also under review.

  13. Cross-calibration of Fuji TR image plate and RAR 2492 x-ray film to determine the response of a DITABIS Super Micron image plate scanner

    NASA Astrophysics Data System (ADS)

    Dunham, G.; Harding, E. C.; Loisel, G. P.; Lake, P. W.; Nielsen-Weber, L. B.

    2016-11-01

    Fuji TR image plate is frequently used as a replacement detector medium for x-ray imaging and spectroscopy diagnostics at NIF, Omega, and Z facilities. However, the familiar Fuji BAS line of image plate scanners is no longer supported by the industry, and so a replacement scanning system is needed. While the General Electric Typhoon line of scanners could replace the Fuji systems, the shift away from photo stimulated luminescence units to 16-bit grayscale Tag Image File Format (TIFF) leaves a discontinuity when comparing data collected from both systems. For the purposes of quantitative spectroscopy, a known unit of intensity applied to the grayscale values of the TIFF is needed. The DITABIS Super Micron image plate scanning system was tested and shown to potentially rival the resolution and dynamic range of Kodak RAR 2492 x-ray film. However, the absolute sensitivity of the scanner is unknown. In this work, a methodology to cross calibrate Fuji TR image plate and the absolutely calibrated Kodak RAR 2492 x-ray film is presented. Details of the experimental configurations used are included. An energy dependent scale factor to convert Fuji TR IP scanned on a DITABIS Super Micron scanner from 16-bit grayscale TIFF to intensity units (i.e., photons per square micron) is discussed.

  14. STS-103 crew take part in CEIT

    NASA Technical Reports Server (NTRS)

    1999-01-01

    In the Payload Hazardous Servicing Facility, the STS-103 crew look over equipment to be used during their mission. The seven-member crew, taking part in a Crew Equipment Interface Test, are Commander Curtis L. Brown Jr., Pilot Scott J. Kelly, and Mission Specialists Steven L. Smith, C. Michael Foale (Ph.D.), John M. Grunsfeld (Ph.D.), Claude Nicollier of Switzerland, and Jean-Frangois Clervoy of France. Nicollier and Clervoy are with the European Space Agency. Mission STS-103 is a 'call-up' due to the need to replace portions of the pointing system, the gyros, which have begun to fail on the Hubble Space Telescope. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. The scheduled launch date in October is under review.

  15. Cross-calibration of Fuji TR image plate and RAR 2492 x-ray film to determine the response of a DITABIS Super Micron image plate scanner

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dunham, G., E-mail: gsdunha@sandia.gov; Harding, E. C.; Loisel, G. P.

    Fuji TR image plate is frequently used as a replacement detector medium for x-ray imaging and spectroscopy diagnostics at NIF, Omega, and Z facilities. However, the familiar Fuji BAS line of image plate scanners is no longer supported by the industry, and so a replacement scanning system is needed. While the General Electric Typhoon line of scanners could replace the Fuji systems, the shift away from photo stimulated luminescence units to 16-bit grayscale Tag Image File Format (TIFF) leaves a discontinuity when comparing data collected from both systems. For the purposes of quantitative spectroscopy, a known unit of intensity appliedmore » to the grayscale values of the TIFF is needed. The DITABIS Super Micron image plate scanning system was tested and shown to potentially rival the resolution and dynamic range of Kodak RAR 2492 x-ray film. However, the absolute sensitivity of the scanner is unknown. In this work, a methodology to cross calibrate Fuji TR image plate and the absolutely calibrated Kodak RAR 2492 x-ray film is presented. Details of the experimental configurations used are included. An energy dependent scale factor to convert Fuji TR IP scanned on a DITABIS Super Micron scanner from 16-bit grayscale TIFF to intensity units (i.e., photons per square micron) is discussed.« less

  16. KSC-99pp1086

    NASA Image and Video Library

    1999-09-02

    In the Payload Hazardous Servicing Facility, the STS-103 crew look over equipment to be used during their mission. The seven-member crew, taking part in a Crew Equipment Interface Test, are Commander Curtis L. Brown Jr., Pilot Scott J. Kelly, and Mission Specialists Steven L. Smith, C. Michael Foale (Ph.D.), John M. Grunsfeld (Ph.D.), Claude Nicollier of Switzerland, and Jean-François Clervoy of France. Nicollier and Clervoy are with the European Space Agency. Mission STS-103 is a "call-up" due to the need to replace portions of the pointing system, the gyros, which have begun to fail on the Hubble Space Telescope. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. The scheduled launch date in October is under review

  17. Stainless Steel NaK Circuit Integration and Fill Submission

    NASA Technical Reports Server (NTRS)

    Garber, Anne E.

    2006-01-01

    The Early Flight Fission Test Facilities (EFF-TF) team has been tasked by the Marshall Space Flight Center Nuclear Systems Office to design, fabricate, and test an actively pumped alkali metal flow circuit. The system, which was originally designed to hold a eutectic mixture of sodium potassium (NaK), was redesigned to hold lithium; but due to a shift in focus, it is once again being prepared for use with NaK. Changes made to the actively pumped, high temperature loop include the replacement of the expansion reservoir, addition of remotely operated valves, and modification of the support table. Basic circuit components include: reactor segment, NaK to gas heat exchanger, electromagnetic (EM) liquid metal pump, load/drain reservoir, expansion reservoir, instrumentation, and a spill reservoir. A 37-pin partial-array core (pin and flow path dimensions are the same as those in a full design) was selected for fabrication and test. This document summarizes the integration and fill of the pumped liquid metal NaK flow circuit.

  18. NDAS Hardware Translation Layer Development

    NASA Technical Reports Server (NTRS)

    Nazaretian, Ryan N.; Holladay, Wendy T.

    2011-01-01

    The NASA Data Acquisition System (NDAS) project is aimed to replace all DAS software for NASA s Rocket Testing Facilities. There must be a software-hardware translation layer so the software can properly talk to the hardware. Since the hardware from each test stand varies, drivers for each stand have to be made. These drivers will act more like plugins for the software. If the software is being used in E3, then the software should point to the E3 driver package. If the software is being used at B2, then the software should point to the B2 driver package. The driver packages should also be filled with hardware drivers that are universal to the DAS system. For example, since A1, A2, and B2 all use the Preston 8300AU signal conditioners, then the driver for those three stands should be the same and updated collectively.

  19. Remtech SSME nozzle design TPS

    NASA Technical Reports Server (NTRS)

    Bancroft, Steven A.; Engel, Carl D.; Pond, John E.

    1990-01-01

    Thermal damage to the Space Shuttle Main Engine (SSME) aft manifold Thermal Protection System (TPS) has been observed for flights STS-8 through STS-13. This damaged area is located on the ME2 and ME3 and extends over a region of approximately one square foot. Total failure or burn-through of the TPS could lead to severe thermal damage of the SSME manifold and loss of an engine nozzle necessitating nozzle replacement causing significant schedule delays and cost increases. Thermal damage to the manifold can be defined as a situation where the manifold temperature becomes greater than 1300 F; thereby causing loss of heat treatment in the nozzle. Results of Orbiter/nozzle wind tunnel tests and Hot Gas Facility tests of the TPS are presented. Aerothermal and thermal analysis models for the SSME aft manifold are discussed along with the flight predictions, design trajectory and design environment. Finally, the TPS design concept and TPS thermal response are addressed.

  20. Status Report for the Hypervelocity Free-Flight Aerodynamic Facility

    NASA Technical Reports Server (NTRS)

    Cornelison, Charles J.; Arnold, James O. (Technical Monitor)

    1997-01-01

    The Hypervelocity Free-Flight Aerodynamic Facility, located at Ames Research Center, is NASA's only aeroballistic facility. During 1997, its model imaging and time history recording systems were the focus of a major refurbishment effort. Specifically the model detection, spark gap (light source); Kerr cell (high speed shuttering); and interval timer sub-systems were inspected, repaired, modified or replaced as required. These refurbishment efforts have fully restored the HFFAF's capabilities to a much better condition, comparable to what it was 15 years ago. Details of this refurbishment effort along with a brief discussion of future upgrade plans are presented.

  1. Safety analysis, 200 Area, Savannah River Plant: Separations area operations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Perkins, W.C.; Lee, R.; Allen, P.M.

    1991-07-01

    The nev HB-Line, located on the fifth and sixth levels of Building 221-H, is designed to replace the aging existing HB-Line production facility. The nev HB-Line consists of three separate facilities: the Scrap Recovery Facility, the Neptunium Oxide Facility, and the Plutonium Oxide Facility. There are three separate safety analyses for the nev HB-Line, one for each of the three facilities. These are issued as supplements to the 200-Area Safety Analysis (DPSTSA-200-10). These supplements are numbered as Sup 2A, Scrap Recovery Facility, Sup 2B, Neptunium Oxide Facility, Sup 2C, Plutonium Oxide Facility. The subject of this safety analysis, the, Plutoniummore » Oxide Facility, will convert nitrate solutions of {sup 238}Pu to plutonium oxide (PuO{sub 2}) powder. All these new facilities incorporate improvements in: (1) engineered barriers to contain contamination, (2) barriers to minimize personnel exposure to airborne contamination, (3) shielding and remote operations to decrease radiation exposure, and (4) equipment and ventilation design to provide flexibility and improved process performance.« less

  2. A Study of Mars Dust Environment Simulation at NASA Johnson Space Center Energy Systems Test Area Resource Conversion Test Facility

    NASA Technical Reports Server (NTRS)

    Chen, Yuan-Liang Albert

    1999-01-01

    The dust environment on Mars is planned to be simulated in a 20 foot thermal-vacuum chamber at the Johnson Space Center, Energy Systems Test Area Resource Conversion Test Facility in Houston, Texas. This vacuum chamber will be used to perform tests and study the interactions between the dust in Martian air and ISPP hardware. This project is to research, theorize, quantify, and document the Mars dust/wind environment needed for the 20 foot simulation chamber. This simulation work is to support the safety, endurance, and cost reduction of the hardware for the future missions. The Martian dust environment conditions is discussed. Two issues of Martian dust, (1) Dust Contamination related hazards, and (2) Dust Charging caused electrical hazards, are of our interest. The different methods of dust particles measurement are given. The design trade off and feasibility were studied. A glass bell jar system is used to evaluate various concepts for the Mars dust/wind environment simulation. It was observed that the external dust source injection is the best method to introduce the dust into the simulation system. The dust concentration of 30 Mg/M3 should be employed for preparing for the worst possible Martian atmosphere condition in the future. Two approaches thermal-panel shroud for the hardware conditioning are discussed. It is suggested the wind tunnel approach be used to study the dust charging characteristics then to be apply to the close-system cyclone approach. For the operation cost reduction purpose, a dehumidified ambient air could be used to replace the expensive CO2 mixture for some tests.

  3. Space Suit Electrocardiographic Electrode Selection: Are commercial electrodes better than the old Apollo technology?

    NASA Technical Reports Server (NTRS)

    Redmond, M.; Polk, J. D.; Hamilton, D.; Schuette, M.; Guttromson, J.; Guess, T.; Smith, B.

    2005-01-01

    The NASA Manned Space Program uses an electrocardiograph (ECG) system to monitor astronauts during extravehicular activity (EVA). This ECG system, called the Operational Bioinstrumentation System (OBS), was developed during the Apollo era. Throughout the Shuttle program these electrodes experienced failures during several EVAs performed from the Space Shuttle and International Space Station (ISS) airlocks. An attempt during Shuttle Flight STS-109 to replace the old electrodes with new commercial off-the-shelf (COTS) disposable electrodes proved unsuccessful. One assumption for failure of the STS-109 COTS electrodes was the expansion of trapped gases under the foam electrode pad, causing the electrode to be displaced from the skin. Given that our current electrodes provide insufficient reliability, a number of COTS ECG electrodes were tested at the NASA Altitude Manned Chamber Test Facility. Methods: OBS disposable electrodes were tested on human test subjects in an altitude chamber simulating an Extravehicular Mobility Unit (EMU) operating pressure of 4.3 psia with the following goals: (1) to confirm the root cause of the flight certified, disposable electrode failure during flight STS-109. (2) to identify an adequate COTS replacement electrode and determine if further modifications to the electrodes are required. (3) to evaluate the adhesion of each disposable electrode without preparation of the skin with isopropyl alcohol. Results: There were several electrodes that failed the pressure testing at 4.3psia, including the electrodes used during flight STS-109. Two electrodes functioned well throughout all testing and were selected for further testing in an EMU at altitude. A vent hole placed in all electrodes was also tested as a possible solution to prevent gas expansion from causing electrode failures. Conclusions: Two failure modes were identified: (1) foam-based porous electrodes entrapped air bubbles under the pad (2) poor adhesion caused some electrodes to fail

  4. 49 CFR 193.2401 - Scope.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES: FEDERAL SAFETY STANDARDS Equipment § 193.2401 Scope. After March 31, 2000, each new, replaced, relocated or significantly altered vaporization equipment, liquefaction equipment, and control systems must be...

  5. Utility accommodation policy of the Iowa State Highway Commission.

    DOT National Transportation Integrated Search

    1970-05-01

    This policy covers initial placement, adjustment, relocation and : replacement of utility facilities in, on, above or below all highway : rightof way over:Wnicn tneiowa.~state :Hig'hwaycommission exercises : control of access. It embodies the bas...

  6. 47 CFR 90.699 - Transition of the upper 200 channels in the 800 MHz band to EA licensing.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... activities necessary for implementing the replacement facilities, including engineering and cost analysis of... procedures provide several alternative methods such as binding arbitration, mediation, or other ADR...

  7. Identification of High Performance, Low Environmental Impact Materials and Processes Using Systematic Substitution (SyS)

    NASA Technical Reports Server (NTRS)

    Dhooge, P. M.; Nimitz, J. S.

    2001-01-01

    Process analysis can identify opportunities for efficiency improvement including cost reduction, increased safety, improved quality, and decreased environmental impact. A thorough, systematic approach to materials and process selection is valuable in any analysis. New operations and facilities design offer the best opportunities for proactive cost reduction and environmental improvement, but existing operations and facilities can also benefit greatly. Materials and processes that have been used for many years may be sources of excessive resource use, waste generation, pollution, and cost burden that should be replaced. Operational and purchasing personnel may not recognize some materials and processes as problems. Reasons for materials or process replacement may include quality and efficiency improvements, excessive resource use and waste generation, materials and operational costs, safety (flammability or toxicity), pollution prevention, compatibility with new processes or materials, and new or anticipated regulations.

  8. PRELIMINARY EVALUATION OF DWPF IMPACTS OF BORIC ACID USE IN CESIUM STRIP FOR SWPF AND MCU

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stone, M.

    2010-09-28

    A new solvent system is being evaluated for use in the Modular Caustic-Side Solvent Extraction Unit (MCU) and in the Salt Waste Processing Facility (SWPF). The new system includes the option to replace the current dilute nitric acid strip solution with boric acid. To support this effort, the impact of using 0.01M, 0.1M, 0.25M and 0.5M boric acid in place of 0.001M nitric acid was evaluated for impacts on the DWPF facility. The evaluation only covered the impacts of boric acid in the strip effluent and does not address the other changes in solvents (i.e., the new extractant, called MaxCalix,more » or the new suppressor, guanidine). Boric acid additions may lead to increased hydrogen generation during the SRAT and SME cycles as well as change the rheological properties of the feed. The boron in the strip effluent will impact glass composition and could require each SME batch to be trimmed with boric acid to account for any changes in the boron from strip effluent additions. Addition of boron with the strip effluent will require changes in the frit composition and could lead to changes in melt behavior. The severity of the impacts from the boric acid additions is dependent on the amount of boric acid added by the strip effluent. The use of 0.1M or higher concentrations of boric acid in the strip effluent was found to significantly impact DWPF operations while the impact of 0.01M boric acid is expected to be relatively minor. Experimental testing is required to resolve the issues identified during the preliminary evaluation. The issues to be addressed by the testing are: (1) Impact on SRAT acid addition and hydrogen generation; (2) Impact on melter feed rheology; (3) Impact on glass composition control; (4) Impact on frit production; and (5) Impact on melter offgas. A new solvent system is being evaluated for use in the Modular Caustic-Side Solvent Extraction Unit (MCU) and in the Salt Waste Processing Facility (SWPF). The new system includes the option to replace the current dilute nitric acid strip solution with boric acid. To support this effort, the impact of using 0.01M, 0.1M, 0.25M and 0.5M boric acid in place of 0.001M nitric acid was evaluated for impacts on the DWPF facility. The evaluation only covered the impacts of boric acid in the strip effluent and does not address the other changes in solvents (i.e., the new extractant, called MaxCalix, or the new suppressor, guanidine). Experimental testing with the improved solvent is required to determine the impact of any changes in the entrained solvent on DWPF processing.« less

  9. Summary of Test Results of MQXFS1 - The First Short Model 150 mm Aperture $$Nb_3Sn$$ Quadrupole for the High-Luminosity

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stoynev, S.; et al.

    The development ofmore » $$Nb_3Sn$$ quadrupole magnets for the High-Luminosity LHC upgrade is a joint venture between the US LHC Accelerator Research Program (LARP)* and CERN with the goal of fabricating large aperture quadrupoles for the LHC in-teraction regions (IR). The inner triplet (low-β) NbTi quadrupoles in the IR will be replaced by the stronger Nb3Sn magnets boosting the LHC program of having 10-fold increase in integrated luminos-ity after the foreseen upgrades. Previously LARP conducted suc-cessful tests of short and long models with up to 120 mm aperture. The first short 150 mm aperture quadrupole model MQXFS1 was assembled with coils fabricated by both CERN and LARP. The magnet demonstrated strong performance at the Fermilab’s verti-cal magnet test facility reaching the LHC operating limits. This paper reports the latest results from MQXFS1 tests with changed pre-stress levels. The overall magnet performance, including quench training and memory, ramp rate and temperature depend-ence, is also summarized.« less

  10. Evaluation of Preproduction Hardware Components for IMS Station Upgrades to Reduce Manufacturers Development Time

    NASA Astrophysics Data System (ADS)

    Hart, Darren; Pearce, Nathan; Starovoit, Yuri; Guralp, Cansun

    2014-05-01

    Since the Comprehensive Nuclear-Test-Ban Treaty was opened for signature in 1996, nearly 80% of the network has been certified as operational, and those stations are sending data to the International Data Centre (IDC) in Vienna. Several International Monitoring System (IMS) monitoring facilities have been in operation for close to 15 years, and several certified stations are facing equipment obsolescence issues. The search for engineering solutions to replace obsolete hardware components is guided by two primary goals: 1) be compliant with IMS minimum technical requirements and 2) be able to be integrated with the existing system. To reduce the development and verification time necessary to address obsolescence in equipment, the PTS has requested the preproduction testing of the recently revised Guralp CMG-DM24AM digitizer. Performing preproduction testing has helped in identifying issues, which Guralp Systems has resolved. In our poster, we will review the reasons for the digitizer updates, present results of the preproduction testing of the Guralp digitizer, and comment on the value this process has provided to the IMS operation.

  11. Operation of a LAr-TPC equipped with a multilayer LEM charge readout

    DOE PAGES

    Baibussinov, B.; Centro, S.; Farnese, C.; ...

    2018-03-01

    A novel detector for ionization signals in a single phase LAr-TPC has been experimented in the ICARINO test facility at the INFN Laboratories in Legnaro. It is based on the adoption of a multilayer Large Electron Multiplier (LEM) replacing the traditional anodic wire arrays. Cosmic muon tracks were detected allowing the measurement of energy deposition and a first determination of the signal to noise ratio. The analysis of the recorded events thus demonstrated the 3D reconstruction capability of this device for ionizing events in liquid Argon. The collected fraction of ionization charge is close to about 90%, with signal tomore » noise ratio similar to that measured with more traditional wire chambers.« less

  12. Unattended Dual Current Monitor (UDCM) FY17 Summary Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Newell, Matthew R.

    The UDCM is a low current measurement device designed to record pico-amp to micro-amp currents from radiation detectors. The UDCM is the planned replacement for the IAEA’s obsolete MiniGRAND data acquisition module. Preliminary testing of the UDCM at the IAEA facilities lead to the following recommendations from the IAEA: Increase the measurement range. Lower range by a factor of 5 and upper range by 2 orders of magnitude; Modifications to the web interface; Increase programmable acquisition time to 3600s; Develop a method to handle current offsets and negative current; Error checking when writing data to the uSD card; and Writingmore » BID files along with the currently stored BI0 files.« less

  13. KSC-02pd0031

    NASA Image and Video Library

    2002-01-17

    KENNEDY SPACE CENTER, FLA. -- Workers in the Vertical Processing Facility help guide the Near Infrared Camera and Multi-Object Spectrometer (NICMOS) Cooling System onto a payload carrier. NICMOS II is part of the payload on mission STS-109, the Hubble Servicing Telescope Mission. It is a new experimental cooling system consisting of a compressor and tiny turbines. With the experimental cryogenic system, NASA hopes to re-cool the infrared detectors to below -315 degrees F (-193 degrees Celsius). NICMOS II was previously tested aboard STS-95 in 1998. It could extend the life of the Hubble Space Telescope by several years. Astronauts aboard Columbia on mission STS-109 will be replacing the original NICMOS with the newer version. Launch of mission STS-109 is scheduled for Feb. 28, 2002

  14. KSC-02pd0037

    NASA Image and Video Library

    2002-01-22

    KENNEDY SPACE CENTER, FLA. -- The NICMOS II radiator is ready for checkout in the Vertical Processing Facility. The Near Infrared Camera and Multi-Object Spectrometer (NICMOS) Cooling System is part of the payload on mission STS-109, the Hubble Servicing Telescope mission. NICMOS is a new experimental cooling system consisting of a compressor and tiny turbines. With the experimental cryogenic system, NASA hopes to re-cool the infrared detectors to below -315 degrees F (-193 degrees Celsius). NICMOS II was previously tested aboard STS-95 in 1998. NICMOS could extend the life of the Hubble Space Telescope by several years. Astronauts aboard Columbia on mission STS-109 will be replacing the original NICMOS with the newer version. Launch of Columbia is scheduled Feb. 28, 2002

  15. KSC-02pd0040

    NASA Image and Video Library

    2002-01-22

    KENNEDY SPACE CENTER, FLA. -- Workers in the Vertical Processing Facility oversee the installation of the NICMOS radiator onto the MULE (Multi-Use Lightweight Equipment) carrier. Part of the payload on mission STS-109, the Near Infrared Camera and Multi-Object Spectrometer (NICMOS) is a new experimental cooling system consisting of a compressor and tiny turbines. With the experimental cryogenic system, NASA hopes to re-cool the infrared detectors to below -315 degrees F (-193 degrees Celsius). NICMOS II was previously tested aboard STS-95 in 1998. NICMOS could extend the life of the Hubble Space Telescope by several years. Astronauts aboard Columbia on mission STS-109 will be replacing the original NICMOS with the newer version. Launch of Columbia on mission STS-109 is scheduled Feb. 28, 2002

  16. KSC-02pd0025

    NASA Image and Video Library

    2002-01-17

    KENNEDY SPACE CENTER, FLA. -- Workers in the Vertical Processing Facility wheel a container with the NICMOS II across the floor. The Near Infrared Camera and Multi-Object Spectrometer (NICMOS) Cooling System is part of the payload on mission STS-109, the Hubble Servicing Telescope Mission. NICMOS is a new experimental cooling system consisting of a compressor and tiny turbines. With the experimental cryogenic system, NASA hopes to re-cool the infrared detectors to below -315 degrees F (-193 degrees Celsius). NICMOS II was previously tested aboard STS-95 in 1998. It could extend the life of the Hubble Space Telescope by several years. Astronauts aboard Columbia on mission STS-109 will be replacing the original NICMOS with the newer version. Launch of mission STS-109 is scheduled for Feb. 28, 2002

  17. Operation of a LAr-TPC equipped with a multilayer LEM charge readout

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Baibussinov, B.; Centro, S.; Farnese, C.

    A novel detector for ionization signals in a single phase LAr-TPC has been experimented in the ICARINO test facility at the INFN Laboratories in Legnaro. It is based on the adoption of a multilayer Large Electron Multiplier (LEM) replacing the traditional anodic wire arrays. Cosmic muon tracks were detected allowing the measurement of energy deposition and a first determination of the signal to noise ratio. The analysis of the recorded events thus demonstrated the 3D reconstruction capability of this device for ionizing events in liquid Argon. The collected fraction of ionization charge is close to about 90%, with signal tomore » noise ratio similar to that measured with more traditional wire chambers.« less

  18. Development and applications of nondestructive evaluation at Marshall Space Flight Center

    NASA Technical Reports Server (NTRS)

    Whitaker, Ann F.

    1990-01-01

    A brief description of facility design and equipment, facility usage, and typical investigations are presented for the following: Surface Inspection Facility; Advanced Computer Tomography Inspection Station (ACTIS); NDE Data Evaluation Facility; Thermographic Test Development Facility; Radiographic Test Facility; Realtime Radiographic Test Facility; Eddy Current Research Facility; Acoustic Emission Monitoring System; Advanced Ultrasonic Test Station (AUTS); Ultrasonic Test Facility; and Computer Controlled Scanning (CONSCAN) System.

  19. Current Risk Adjustment and Comorbidity Index Underperformance in Predicting Post-Acute Utilization and Hospital Readmissions After Joint Replacements: Implications for Comprehensive Care for Joint Replacement Model.

    PubMed

    Kumar, Amit; Karmarkar, Amol; Downer, Brian; Vashist, Amit; Adhikari, Deepak; Al Snih, Soham; Ottenbacher, Kenneth

    2017-11-01

    To compare the performances of 3 comorbidity indices, the Charlson Comorbidity Index, the Elixhauser Comorbidity Index, and the Centers for Medicare & Medicaid Services (CMS) risk adjustment model, Hierarchical Condition Category (HCC), in predicting post-acute discharge settings and hospital readmission for patients after joint replacement. A retrospective study of Medicare beneficiaries with total knee replacement (TKR) or total hip replacement (THR) discharged from hospitals in 2009-2011 (n = 607,349) was performed. Study outcomes were post-acute discharge setting and unplanned 30-, 60-, and 90-day hospital readmissions. Logistic regression models were built to compare the performance of the 3 comorbidity indices using C statistics. The base model included patient demographics and hospital use. Subsequent models included 1 of the 3 comorbidity indices. Additional multivariable logistic regression models were built to identify individual comorbid conditions associated with high risk of hospital readmissions. The 30-, 60-, and 90-day unplanned hospital readmission rates were 5.3%, 7.2%, and 8.5%, respectively. Patients were most frequently discharged to home health (46.3%), followed by skilled nursing facility (40.9%) and inpatient rehabilitation facility (12.7%). The C statistics for the base model in predicting post-acute discharge setting and 30-, 60-, and 90-day readmission in TKR and THR were between 0.63 and 0.67. Adding the Charlson Comorbidity Index, the Elixhauser Comorbidity Index, or HCC increased the C statistic minimally from the base model for predicting both discharge settings and hospital readmission. The health conditions most frequently associated with hospital readmission were diabetes mellitus, pulmonary disease, arrhythmias, and heart disease. The comorbidity indices and CMS-HCC demonstrated weak discriminatory ability to predict post-acute discharge settings and hospital readmission following joint replacement. © 2017, American College of Rheumatology.

  20. Department of the Army Justification of Estimates for Fiscal Year 1985. Procurement Appropriations-Construction Program Submitted to Congress February 1984. DD Forms 1391.

    DTIC Science & Technology

    1984-02-01

    REQUIREMENT FOR CONSTRUCTION PROJECT: These buildings house electronic equipment, irreplaceable rocket motor design and performance records, a...consists of five subprojects which are to provide modern facilities designed for rocket motor production. These production efficient buildings will...replace facilities which were designed and built in 1930-1942 for artillery shell loading. Four of the sub- projects are for buildings while the fifth

  1. Robot Serviced Space Facility

    NASA Technical Reports Server (NTRS)

    Purves, Lloyd R. (Inventor)

    1992-01-01

    A robot serviced space facility includes multiple modules which are identical in physical structure, but selectively differing in function. and purpose. Each module includes multiple like attachment points which are identically placed on each module so as to permit interconnection with immediately adjacent modules. Connection is made through like outwardly extending flange assemblies having identical male and female configurations for interconnecting to and locking to a complementary side of another flange. Multiple rows of interconnected modules permit force, fluid, data and power transfer to be accomplished by redundant circuit paths. Redundant modules of critical subsystems are included. Redundancy of modules and of interconnections results in a space complex with any module being removable upon demand, either for module replacement or facility reconfiguration. without eliminating any vital functions of the complex. Module replacement and facility assembly or reconfiguration are accomplished by a computer controlled articulated walker type robotic manipulator arm assembly having two identical end-effectors in the form of male configurations which are identical to those on module flanges and which interconnect to female configurations on other flanges. The robotic arm assembly moves along a connected set or modules by successively disconnecting, moving and reconnecting alternate ends of itself to a succession of flanges in a walking type maneuver. To transport a module, the robot keeps the transported module attached to one of its end-effectors and uses another flange male configuration of the attached module as a substitute end-effector during walking.

  2. KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility, STS-114 Mission Specialist Andrew Thomas (left) works with equipment while Mission Specialist Soichi Noguchi watches. Noguchi is with the Japanese Aerospace Exploration Agency (JAXA). They and other crew members are at KSC for equipment familiarization. STS-114 is classified as Logistics Flight 1 to the International Space Station, delivering new supplies and replacing one of the orbital outpost’s Control Moment Gyroscopes (CMGs). STS-114 will also carry a Raffaello Multi-Purpose Logistics Module and the External Stowage Platform-2. The crew is slated to conduct at least three spacewalks: They will demonstrate repair techniques of the Shuttle’s Thermal Protection System, replace the failed CMG with one delivered by the Shuttle, and install the External Stowage Platform.

    NASA Image and Video Library

    2004-01-27

    KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility, STS-114 Mission Specialist Andrew Thomas (left) works with equipment while Mission Specialist Soichi Noguchi watches. Noguchi is with the Japanese Aerospace Exploration Agency (JAXA). They and other crew members are at KSC for equipment familiarization. STS-114 is classified as Logistics Flight 1 to the International Space Station, delivering new supplies and replacing one of the orbital outpost’s Control Moment Gyroscopes (CMGs). STS-114 will also carry a Raffaello Multi-Purpose Logistics Module and the External Stowage Platform-2. The crew is slated to conduct at least three spacewalks: They will demonstrate repair techniques of the Shuttle’s Thermal Protection System, replace the failed CMG with one delivered by the Shuttle, and install the External Stowage Platform.

  3. 40 CFR 85.2208 - Alternative standards and procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... higher than the tests they would replace; (ii) Such procedures show a correlation with the Federal Test... higher than the tests they would replace; (ii) Such procedures show a correlation with the Federal Test...

  4. Control console replacement at the WPI Reactor. [Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-12-31

    With partial funding from the Department of Energy (DOE) University Reactor Instrumentation Upgrade Program (DOE Grant No. DE-FG02-90ER12982), the original control console at the Worcester Polytechnic Institute (WPI) Reactor has been replaced with a modern system. The new console maintains the original design bases and functionality while utilizing current technology. An advanced remote monitoring system has been added to augment the educational capabilities of the reactor. Designed and built by General Electric in 1959, the open pool nuclear training reactor at WPI was one of the first such facilities in the nation located on a university campus. Devoted to undergraduatemore » use, the reactor and its related facilities have been since used to train two generations of nuclear engineers and scientists for the nuclear industry. The reactor power level was upgraded from 1 to 10 kill in 1969, and its operating license was renewed for 20 years in 1983. In 1988, the reactor was converted to low enriched uranium. The low power output of the reactor and ergonomic facility design make it an ideal tool for undergraduate nuclear engineering education and other training.« less

  5. 14 CFR 61.29 - Replacement of a lost or destroyed airman or medical certificate or knowledge test report.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Replacement of a lost or destroyed airman or medical certificate or knowledge test report. 61.29 Section 61.29 Aeronautics and Space FEDERAL... certificate or knowledge test report. (a) A request for the replacement of a lost or destroyed airman...

  6. 14 CFR 61.29 - Replacement of a lost or destroyed airman or medical certificate or knowledge test report.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 2 2011-01-01 2011-01-01 false Replacement of a lost or destroyed airman or medical certificate or knowledge test report. 61.29 Section 61.29 Aeronautics and Space FEDERAL... certificate or knowledge test report. (a) A request for the replacement of a lost or destroyed airman...

  7. Mechanical Properties of Lightweight Concrete Using Recycled Cement-Sand Brick as Coarse Aggregates Replacement

    NASA Astrophysics Data System (ADS)

    Joohari, Ilya; Farhani Ishak, Nor; Amin, Norliyati Mohd

    2018-03-01

    This paper presents the result of replacing natural course aggregate with recycled cement-sand brick (CSB) towards the mechanical properties of concrete. Natural aggregates were used in this study as a control sample to compare with recycled coarse aggregates. This study was also carried to determine the optimum proportion of coarse aggregates replacement to produce lightweight concrete. Besides, this study was conducted to observe the crack and its behaviour development during the mechanical testing. Through this study, four types of concrete mixed were prepared, which were the control sample, 25%, 50% and 75% replacement of CSB. The test conducted to determine the effectiveness of recycled CSB as coarse aggregates replacement in this study were slump test, density measurement, compression test, and flexural test and. The strength of concrete was tested at 7 days and 28 days of curing. From the results obtained, the optimum proportion which produced the highest strength is 25% replacement of recycled CSB. The compressive and flexural strength has decreased by 10%-12% and 4%-34% respectively compared to the control sample. The presence of recycled coarse aggregates in sample has decreased the density of concrete by 0.8%-3% compared to the control sample.

  8. Energy Efficiency Upgrades

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Roby Williams

    2012-03-29

    The energy efficiency upgrades project at Hardin County General Hospital did not include research nor was it a demonstration project. The project enabled the hospital to replace outdated systems with modern efficient models. Hardin County General Hospital is a 501c3, nonprofit hospital and the sole community provider for Hardin and Pope Counties of Illinois. This project provided much needed equipment and facility upgrades that would not have been possible through locally generated funding. Task 1 was a reroofing of the hospital. The hospital architect designed the replacement to increase the energy efficiency of the hospital roof/ceiling structure. Task 2 wasmore » replacement and installation of a new more efficient CT scanner for the hospital. Included in the project was replacement of HVAC equipment for the entire radiological suite. Task 5 was a replacement and installation of a new higher capacity diesel-fueled emergency generator for the hospital replacing a 50+ year old gas-fired generator. Task 7 was the replacement of 50+ year-old walk-in cooler/freezer with a newer, energy efficient model. Task 8 was the replacement of 10+ year-old washing machines in the hospital laundry with higher capacity, energy efficient models. Task 9 was replacement of 50-year old single pane curtain window system with double-pane insulated windows. Additionally, insulation was added around ventilation systems and the curtain wall system.« less

  9. Development of an above-knee prosthesis equipped with a microcomputer-controlled knee joint: first test results.

    PubMed

    Aeyels, B; Peeraer, L; Vander Sloten, J; Van der Perre, G

    1992-05-01

    The shortcomings of conventional above-knee prostheses are due to their lack of adaptive control. Implementation of a microcomputer controlling the knee joint in a passive way has been suggested to enhance the patient's gait comfort, safety and cosmesis. This approach was used in the design of a new prosthetic system for the above-knee amputee, and tested on one patient. The knee joint of a conventional, modular prosthesis was replaced by a knee joint mechanism, equipped with a controllable brake on the knee joint axis. Sensors and a microcomputer were added, keeping the system self-contained. The modularity of the design permits the use of an alternative, external, PC-based control unit, emulating the self-contained one, and offering extended data monitoring and storage facilities. For both units an operating environment was written, including sensor/actuator interfacing and the implementation of a real-time interrupt, executing the control algorithm. A double finite state approach was used in the design of the control algorithm. On a higher level, the mode identification algorithm reveals the patient's intent. Within a specific mode (lower level), the relevant mode control algorithm looks for the current phase within the gait cycle. Within a particular phase, a specific simple control action with the brake replaces normal knee muscle activity. Tests were carried out with one prosthetic patient using a basic control algorithm for level walking, allowing controlled knee flexion during stance phase. The technical feasibility of such a concept is illustrated by the test results, even though only flexion during early stance phase was controlled during the trials.(ABSTRACT TRUNCATED AT 250 WORDS)

  10. Use of a Scale Model in the Design of Modifications to the NASA Glenn Icing Research Tunnel

    NASA Technical Reports Server (NTRS)

    Canacci, Victor A.; Gonsalez, Jose C.; Spera, David A.; Burke, Thomas (Technical Monitor)

    2001-01-01

    Major modifications were made in 1999 to the 6- by 9-Foot (1.8- by 2.7-m) Icing Research tunnel (IRT) at the NASA Glenn Research Center, including replacement of its heat exchanger and associated ducts and turning vanes, and the addition of fan outlet guide vanes (OGV's). A one-tenth scale model of the IRT (designated as the SMIRT) was constructed with and without these modifications and tested to increase confidence in obtaining expected improvements in flow quality around the tunnel loop. The SMIRT is itself an aerodynamic test facility whose flow patterns without modifications have been shown to be accurate, scaled representations of those measured in the IRT prior to the 1999 upgrade program. In addition, tests in the SMIRT equipped with simulated OGV's indicated that these devices in the IRT might reduce flow distortions immediately downstream of the fan by two thirds. Flow quality parameters measured in the SMIRT were projected to the full-size modified IRT, and quantitative estimates of improvements in flow quality were given prior to construction. In this paper, the results of extensive flow quality studies conducted in the SMIRT are documented. Samples of these are then compared with equivalent measurements made in the full-scale IRT, both before and after its configuration was upgraded. Airspeed, turbulence intensity, and flow angularity distributions are presented for cross sections downstream of the drive fan, both upstream and downstream of the replacement flat heat exchanger, in the stilling chamber, in the test section, and in the wakes of the new comer turning vanes with their unique expanding and contracting designs. Lessons learned from these scale-model studies are discussed.

  11. Pre-test analysis of protected loss of primary pump transients in CIRCE-HERO facility

    NASA Astrophysics Data System (ADS)

    Narcisi, V.; Giannetti, F.; Del Nevo, A.; Tarantino, M.; Caruso, G.

    2017-11-01

    In the frame of LEADER project (Lead-cooled European Advanced Demonstration Reactor), a new configuration of the steam generator for ALFRED (Advanced Lead Fast Reactor European Demonstrator) was proposed. The new concept is a super-heated steam generator, double wall bayonet tube type with leakage monitoring [1]. In order to support the new steam generator concept, in the framework of Horizon 2020 SESAME project (thermal hydraulics Simulations and Experiments for the Safety Assessment of MEtal cooled reactors), the ENEA CIRCE pool facility will be refurbished to host the HERO (Heavy liquid mEtal pRessurized water cOoled tubes) test section to investigate a bundle of seven full scale bayonet tubes in ALFRED-like thermal hydraulics conditions. The aim of this work is to verify thermo-fluid dynamic performance of HERO during the transition from nominal to natural circulation condition. The simulations have been performed with RELAP5-3D© by using the validated geometrical model of the previous CIRCE-ICE test section [2], in which the preceding heat exchanger has been replaced by the new bayonet bundle model. Several calculations have been carried out to identify thermal hydraulics performance in different steady state conditions. The previous calculations represent the starting points of transient tests aimed at investigating the operation in natural circulation. The transient tests consist of the protected loss of primary pump, obtained by reducing feed-water mass flow to simulate the activation of DHR (Decay Heat Removal) system, and of the loss of DHR function in hot conditions, where feed-water mass flow rate is absent. According to simulations, in nominal conditions, HERO bayonet bundle offers excellent thermal hydraulic behavior and, moreover, it allows the operation in natural circulation.

  12. Management of medical technology: case study of a major acute hospital.

    PubMed

    Brown, Ian; Smale, Andrew

    2007-01-01

    This paper presents results of a Capital Equipment Management Plan undertaken at a major acute hospital in Australia. By classifying existing equipment using a threshold replacement value into Major and Minor items, detailed planning information was collected for 527 items of Major equipment representing 80% of the hospital's total equipment stock. A number of meaningful views of this significant asset base are presented, and a prioritisation method used to provide recommendations for future equipment replacement and acquisition for a 5 year planning period. The survey work to identify and document actual equipment items provides a convincing argument for the funding levels required for capital equipment replacement and acquisition, and evidence for the extent of technology reliance in modern health care facilities.

  13. 25 CFR Appendix A to Subpart G - List of Activities Eligible for Funding Under BIA Transportation Facility Maintenance Program

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... Maintenance Program. The list is not all-inclusive. 1. Cleaning and repairing ditches and culverts. 2... additional culverts to prevent roadway and adjoining property damage. 4. Repairing, replacing or installing...

  14. 25 CFR Appendix A to Subpart G - List of Activities Eligible for Funding Under BIA Transportation Facility Maintenance Program

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... Maintenance Program. The list is not all-inclusive. 1. Cleaning and repairing ditches and culverts. 2... additional culverts to prevent roadway and adjoining property damage. 4. Repairing, replacing or installing...

  15. 25 CFR Appendix A to Subpart G - List of Activities Eligible for Funding Under BIA Transportation Facility Maintenance Program

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... Maintenance Program. The list is not all-inclusive. 1. Cleaning and repairing ditches and culverts. 2... additional culverts to prevent roadway and adjoining property damage. 4. Repairing, replacing or installing...

  16. Utility accommodation policy of the Iowa State Highway Commission.

    DOT National Transportation Integrated Search

    1973-02-01

    This policy covers. initial placement, adjustment, relocation and : replacement of utility facilities in, on., above or below all highway : right of way over which the Iowa State Highway Corninission exe:tcii:les : cont.rol of access. It embodies the...

  17. 77 FR 8095 - Review and Approval of Projects

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-14

    ... disposal facility; insert language authorizing renewal of expiring approvals, including Approvals by Rule (ABRs); delete specific references to geologic formations that may be the subject of natural gas development using hydrofracture stimulation and replace with a generic category--``unconventional natural gas...

  18. Policy for accommodating utilities on state highway rights-of-way, 1985.

    DOT National Transportation Integrated Search

    1985-04-01

    This policy covers initial placement, adjustment, relocation and : replacement of utility facilities in, on, above or below all highway right of : way over which the Iowa Department of Transportation exercises control of : access. It embodies the bas...

  19. 78 FR 47695 - Sam Rayburn Dam Power Rate

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-06

    ... replacements in the hydroelectric generating facilities and small increases to annual operations and... K. McDonald, Vice President for Corporate Operations/Chief Operating Officer, Southwestern Power... Code of Federal Regulations (18 CFR 300). Southwestern markets power from 24 multi-purpose reservoir...

  20. Re-Engineering the ISS Payload Operations Control Center During Increased Utilization and Critical Onboard Events

    NASA Technical Reports Server (NTRS)

    Marsh, Angela L.; Dudley, Stephanie R. B.

    2014-01-01

    With an increase in the utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS realtime operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art media wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project.

  1. Controlling Infrastructure Costs: Right-Sizing the Mission Control Facility

    NASA Technical Reports Server (NTRS)

    Martin, Keith; Sen-Roy, Michael; Heiman, Jennifer

    2009-01-01

    Johnson Space Center's Mission Control Center is a space vehicle, space program agnostic facility. The current operational design is essentially identical to the original facility architecture that was developed and deployed in the mid-90's. In an effort to streamline the support costs of the mission critical facility, the Mission Operations Division (MOD) of Johnson Space Center (JSC) has sponsored an exploratory project to evaluate and inject current state-of-the-practice Information Technology (IT) tools, processes and technology into legacy operations. The general push in the IT industry has been trending towards a data-centric computer infrastructure for the past several years. Organizations facing challenges with facility operations costs are turning to creative solutions combining hardware consolidation, virtualization and remote access to meet and exceed performance, security, and availability requirements. The Operations Technology Facility (OTF) organization at the Johnson Space Center has been chartered to build and evaluate a parallel Mission Control infrastructure, replacing the existing, thick-client distributed computing model and network architecture with a data center model utilizing virtualization to provide the MCC Infrastructure as a Service. The OTF will design a replacement architecture for the Mission Control Facility, leveraging hardware consolidation through the use of blade servers, increasing utilization rates for compute platforms through virtualization while expanding connectivity options through the deployment of secure remote access. The architecture demonstrates the maturity of the technologies generally available in industry today and the ability to successfully abstract the tightly coupled relationship between thick-client software and legacy hardware into a hardware agnostic "Infrastructure as a Service" capability that can scale to meet future requirements of new space programs and spacecraft. This paper discusses the benefits and difficulties that a migration to cloud-based computing philosophies has uncovered when compared to the legacy Mission Control Center architecture. The team consists of system and software engineers with extensive experience with the MCC infrastructure and software currently used to support the International Space Station (ISS) and Space Shuttle program (SSP).

  2. KSC-08pd2361

    NASA Image and Video Library

    2008-08-08

    CAPE CANAVERAL, Fla. – In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, the Fine Guidance Sensor Scientific Instrument Protective Enclosure, or FSIPE, cover has been installed on the Orbital Replacement Unit Carrier, or ORUC. The ORUC is one of three carriers that are being prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the fifth and final Hubble servicing mission, STS-125. Launch is targeted for Oct. 8. PHoto credit: NASA/Jack Pfaller

  3. KSC-08pd2358

    NASA Image and Video Library

    2008-08-08

    CAPE CANAVERAL, Fla. – In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, workers help guide the Fine Guidance Sensor Scientific Instrument Protective Enclosure, or FSIPE, cover alongside the Orbital Replacement Unit Carrier, or ORUC, for installation. The ORUC is one of three carriers that are being prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the fifth and final Hubble servicing mission, STS-125. Launch is targeted for Oct. 8. PHoto credit: NASA/Jack Pfaller

  4. KSC-08pd2357

    NASA Image and Video Library

    2008-08-08

    CAPE CANAVERAL, Fla. – In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, an overhead crane lowers the Fine Guidance Sensor Scientific Instrument Protective Enclosure, or FSIPE, cover alongside the Orbital Replacement Unit Carrier, or ORUC, for installation. The ORUC is one of three carriers that are being prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the fifth and final Hubble servicing mission, STS-125. Launch is targeted for Oct. 8. PHoto credit: NASA/Jack Pfaller

  5. KSC-08pd2359

    NASA Image and Video Library

    2008-08-08

    CAPE CANAVERAL, Fla. – In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, workers help maneuver the Fine Guidance Sensor Scientific Instrument Protective Enclosure, or FSIPE, cover alongside the Orbital Replacement Unit Carrier, or ORUC, for installation. The ORUC is one of three carriers that are being prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the fifth and final Hubble servicing mission, STS-125. Launch is targeted for Oct. 8. PHoto credit: NASA/Jack Pfaller

  6. KSC-08pd2354

    NASA Image and Video Library

    2008-08-08

    CAPE CANAVERAL, Fla. – In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, the Fine Guidance Sensor Scientific Instrument Protective Enclosure, or FSIPE, cover awaits a move to be installed on the Orbital Replacement Unit Carrier, or ORUC. The ORUC is one of three carriers that are being prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the fifth and final Hubble servicing mission, STS-125. Launch is targeted for Oct. 8. PHoto credit: NASA/Jack Pfaller

  7. KSC-08pd2360

    NASA Image and Video Library

    2008-08-08

    CAPE CANAVERAL, Fla. – In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, workers help maneuver the Fine Guidance Sensor Scientific Instrument Protective Enclosure, or FSIPE, cover into place on the Orbital Replacement Unit Carrier, or ORUC, for installation. The ORUC is one of three carriers that are being prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the fifth and final Hubble servicing mission, STS-125. Launch is targeted for Oct. 8. PHoto credit: NASA/Jack Pfaller

  8. Audit Report. Quick-Reaction Report on the Review of Defense Base Closure and Realignment Budget Data for Carswell, Barksdale, Dyess, Minot, and Tinker Air Force Bases

    DTIC Science & Technology

    1992-11-27

    for 10 construction pr~n’jcts for realigning Carswell AFB was not adeauately documented as required by Air Force Regulation (AFR) 86-1, " Programming ...Engineering Programming , Standard Facility Requirements." paragraph 24-70, allows for a total of 25,200 square feet of space for tne warehouse and...cantonment area, and replaced an existing capability. The fact that a replacement wash rack was previously programmed does not alter this requirement

  9. Small engine components test facility compressor testing cell at NASA Lewis Research Center

    NASA Technical Reports Server (NTRS)

    Brokopp, Richard A.; Gronski, Robert S.

    1992-01-01

    LeRC has designed and constructed a new test facility. This facility, called the Small Engine Components Facility (SECTF) is used to test gas turbines and compressors at conditions similar to actual engine conditions. The SECTF is comprised of a compressor testing cell and a turbine testing cell. Only the compressor testing cell is described. The capability of the facility, the overall facility design, the instrumentation used in the facility, and the data acquisition system are discussed in detail.

  10. US Army Research Laboratory Lightweight and Specialty Metals Branch Research and Development (FY14)

    DTIC Science & Technology

    2015-04-01

    LSMB’s vision is to be the leading metals research and development facility for the US Army, which is achieved by attracting and retaining world-class...servicemen and women. 1.2 LSMB Vision The LSMB vision is to be the leading metals research and development facility for the US Army. This vision is achieved...determining the effect from the combined processing of coating and cleaning was crucial to reducing the risk associated with replacing cadmium . In this

  11. KSC-04pd0587

    NASA Image and Video Library

    2004-03-18

    KENNEDY SPACE CENTER, FLA. - A Universal Coolant Transporter (UCT), manufactured in Sharpes, Fla., makes its way to Kennedy Space Center. Replacing the existing ground cooling unit, the UCT is designed to service payloads for the Space Shuttle and International Space Station, and may be capable of servicing space exploration vehicles of the future. It will provide ground cooling to the orbiter and returning payloads, such as science experiments requiring cold or freezing temperatures, during post-landing activities at the Shuttle Landing Facility and during transport of the payloads to other facilities.

  12. KSC-04pd0589

    NASA Image and Video Library

    2004-03-18

    KENNEDY SPACE CENTER, FLA. - A Universal Coolant Transporter (UCT), manufactured in Sharpes, Fla., makes its way to Kennedy Space Center. Replacing the existing ground cooling unit, the UCT is designed to service payloads for the Space Shuttle and International Space Station, and may be capable of servicing space exploration vehicles of the future. It will provide ground cooling to the orbiter and returning payloads, such as science experiments requiring cold or freezing temperatures, during post-landing activities at the Shuttle Landing Facility and during transport of the payloads to other facilities.

  13. KSC-04pd0590

    NASA Image and Video Library

    2004-03-18

    KENNEDY SPACE CENTER, FLA. - A Universal Coolant Transporter (UCT), manufactured in Sharpes, Fla., arrives at Kennedy Space Center. Replacing the existing ground cooling unit, the UCT is designed to service payloads for the Space Shuttle and International Space Station, and may be capable of servicing space exploration vehicles of the future. It will provide ground cooling to the orbiter and returning payloads, such as science experiments requiring cold or freezing temperatures, during post-landing activities at the Shuttle Landing Facility and during transport of the payloads to other facilities.

  14. The Low Temperature Microgravity Physics Experiments Project

    NASA Technical Reports Server (NTRS)

    Holmes, Warren; Lai, Anthony; Croonquist, Arvid; Chui, Talso; Eraker, J. H.; Abbott, Randy; Mills, Gary; Mohl, James; Craig, James; Balachandra, Balu; hide

    2000-01-01

    The Low Temperature Microgravity Physics Facility (LTMPF) is being developed by NASA to provide long duration low temperature and microgravity environment on the International Space Station (ISS) for performing fundamental physics investigations. Currently, six experiments have been selected for flight definition studies. More will be selected in a two-year cycle, through NASA Research Announcement. This program is managed under the Low Temperature Microgravity Physics Experiments Project Office at the Jet Propulsion Laboratory. The facility is being designed to launch and returned to earth on a variety of vehicles including the HII-A and the space shuttle. On orbit, the facility will be connected to the Exposed Facility on the Japanese Experiment Module, Kibo. Features of the facility include a cryostat capable of maintaining super-fluid helium at a temperature of 1.4 K for 5 months, resistance thermometer bridges, multi-stage thermal isolation system, thermometers capable of pico-Kelvin resolution, DC SQUID magnetometers, passive vibration isolation, and magnetic shields with a shielding factor of 80dB. The electronics and software architecture incorporates two VME buses run using the VxWorks operating system. Technically challenging areas in the design effort include the following: 1) A long cryogen life that survives several launch and test cycles without the need to replace support straps for the helium tank. 2) The minimization of heat generation in the sample stage caused by launch vibration 3) The design of compact and lightweight DC SQUID electronics. 4) The minimization of RF interference for the measurement of heat at pico-Watt level. 5) Light weighting of the magnetic shields. 6) Implementation of a modular and flexible electronics and software architecture. The first launch is scheduled for mid-2003, on an H-IIA Rocket Transfer Vehicle, out of the Tanegashima Space Center of Japan. Two identical facilities will be built. While one facility is onboard the ISS, the other is re-integrated on the ground with new experiments. When the cryogen of the facility in space are exhausted, it will be swapped with the other facility with the new experiment. A total of 20 science missions are envisioned over the next 20 years.

  15. Impact of Hong Kong's Voluntary Catalytic Converter Replacement Programme on Roadside Air Quality

    NASA Astrophysics Data System (ADS)

    Simpson, I. J.; Guo, H.; Louie, P. K. K.; Luk, C.; Lyu, X.; Meinardi, S.; Yam, Y. S.; Blake, D. R.

    2015-12-01

    As part of its ongoing policies to improve roadside air quality, in 2013 the Hong Kong government launched an incentive programme to replace catalytic converters and oxygen sensors in taxis and light buses mainly fueled by liquefied petroleum gas (LPG). The majority of replacements occurred from October 2013 to April 2014, with 75% of eligible vehicles participating in the programme, or 16,472 vehicles. Based on taxi exhaust measurements at a Hong Kong vehicle testing facility, the concentrations of n-butane, propane and i-butane (the primary components of LPG) decreased by 97% following the replacements. To determine the impact of the programme on roadside air quality, long-term measurements of volatile organic compounds (VOCs) were analyzed before, during and after the replacement programme, mainly at a busy roadside location in Mong Kok, Hong Kong. A clear decrease in the levels of major pollutants associated with LPG vehicle exhaust was observed at the roadside. For example, average (± 1 standard deviation) n-butane levels from October to April decreased from 13.0 ± 3.6 and 13.9 ± 2.6 ppbv in the two years preceding the programme, to 9.2 ± 2.9 ppbv during the programme, to 6.2 ± 1.7 ppbv the year after the programme. By contrast, compounds such as i-pentane that are not strongly associated with LPG or with LPG exhaust remained steady, averaging 0.90 ± 0.34, 1.01 ± 0.31, 0.93 ± 0.37, and 0.91 ± 0.42 ppbv from October to April of 2011/12, 2012/13, 2013/14 and 2014/15, respectively. Impacts of the programme on roadside levels of nitrogen oxides (NOx) and ozone (O3) will also be discussed. Because many taxis are high mileage vehicles that travel several hundred kilometers daily, their catalytic converters need to be replaced approximately every 18 months. Therefore ongoing vehicle maintenance will be required in order to preserve the gains made from this initial subsidy programme.

  16. Flow Quality Measurements in the NASA Ames Upgraded 11-by 11-Foot Transonic Wind Tunnel

    NASA Technical Reports Server (NTRS)

    Amaya, Max A.; Murthy, Sreedhara V.; George, M. W. (Technical Monitor)

    2000-01-01

    Among the many upgrades designed and implemented in the NASA Ames 11-by 11-Foot Transonic Wind Tunnel over the past few years, several directly affect flow quality in the test section: a turbulence reduction system with a honeycomb and two screens, a flow smoothing system in the back leg diffusers, an improved drive motor control system, and a full replacement set of composite blades for the compressor. Prior to the shut-down of the tunnel for construction activities, an 8-foot span rake populated with flow instrumentation was traversed in the test section to fully document the flow quality and establish a baseline against which the upgrades could be characterized. A similar set of measurements was performed during the recent integrated system test trials, but the scope was somewhat limited in accordance with the primary objective of such tests, namely to return the tunnel to a fully operational status. These measurements clearly revealed substantial improvements in flow angularity and significant reductions in turbulence level for both full-span and semi-span testing configurations, thus making the flow quality of the tunnel one of the best among existing transonic facilities.

  17. EVA Development and Verification Testing at NASA's Neutral Buoyancy Laboratory

    NASA Technical Reports Server (NTRS)

    Jairala, Juniper C.; Durkin, Robert; Marak, Ralph J.; Sipila, Stepahnie A.; Ney, Zane A.; Parazynski, Scott E.; Thomason, Arthur H.

    2012-01-01

    As an early step in the preparation for future Extravehicular Activities (EVAs), astronauts perform neutral buoyancy testing to develop and verify EVA hardware and operations. Neutral buoyancy demonstrations at NASA Johnson Space Center's Sonny Carter Training Facility to date have primarily evaluated assembly and maintenance tasks associated with several elements of the International Space Station (ISS). With the retirement of the Shuttle, completion of ISS assembly, and introduction of commercial players for human transportation to space, evaluations at the Neutral Buoyancy Laboratory (NBL) will take on a new focus. Test objectives are selected for their criticality, lack of previous testing, or design changes that justify retesting. Assembly tasks investigated are performed using procedures developed by the flight hardware providers and the Mission Operations Directorate (MOD). Orbital Replacement Unit (ORU) maintenance tasks are performed using a more systematic set of procedures, EVA Concept of Operations for the International Space Station (JSC-33408), also developed by the MOD. This paper describes the requirements and process for performing a neutral buoyancy test, including typical hardware and support equipment requirements, personnel and administrative resource requirements, examples of ISS systems and operations that are evaluated, and typical operational objectives that are evaluated.

  18. STS-103 crew take part in CEIT in PHSF

    NASA Technical Reports Server (NTRS)

    1999-01-01

    During a Crew Equipment Interface Test in the Payload Hazardous Servicing Facility, members of the STS-103 crew check out the Flight Support System (FSS)from above and below. The FSS is part of the primary payload on the mission to repair the Hubble Space Telescope. The seven-member crew comprises Commander Curtis L. Brown Jr., Pilot Scott J. Kelly, and Mission Specialists Steven L. Smith, C. Michael Foale (Ph.D.), John M. Grunsfeld (Ph.D), Claude Nicollier of Switzerland, and Jean-Frangois Clervoy of France. Nicollier and Clervoy are with the European Space Agency. Mission STS-103 is a 'call-up' due to the need to replace portions of the pointing system, the gyros, which have begun to fail on the Hubble Space Telescope. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid-state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. The scheduled launch date in October is under review.

  19. STS-103 crew take part in CEIT in PHSF

    NASA Technical Reports Server (NTRS)

    1999-01-01

    In the Payload Hazardous Servicing Facility, four STS-103 crew members check the Flight Support System avionics to be used for repair and upgrade of the Hubble Space Telescope. The crew are at KSC to take part in a Crew Equipment Interface Test. The seven-member crew comprises Commander Curtis L. Brown Jr., Pilot Scott J. Kelly, and Mission Specialists Steven L. Smith, C. Michael Foale (Ph.D.), John M. Grunsfeld (Ph.D), Claude Nicollier of Switzerland, and Jean-Frangois Clervoy of France. Nicollier and Clervoy are with the European Space Agency. Mission STS-103 is a 'call-up' due to the need to replace portions of the pointing system, the gyros, which have begun to fail on the Hubble Space Telescope. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid-state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. The scheduled launch date in October is under review.

  20. KSC-99pp1100

    NASA Image and Video Library

    1999-09-03

    In the Orbiter Processing Facility (OPF) bay 1, STS-103 Commander Curtis L. Brown Jr. sits in the command seat of the orbiter Discovery, inspecting the window. Brown and other crew members are at KSC to take part in a Crew Equipment Interface Test. The rest of the crew are Pilot Scott J. Kelly, and Mission Specialists Steven L. Smith, C. Michael Foale (Ph.D.), John M. Grunsfeld (Ph.D.), Claude Nicollier of Switzerland, and Jean-François Clervoy of France. Nicollier and Clervoy are with the European Space Agency. Mission STS-103 is a "call-up" due to the need to replace portions of the pointing system, the gyros, which have begun to fail on the Hubble Space Telescope. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid-state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. The scheduled launch date in October is under review

  1. A Method for Estimating Costs and Benefits of Space Assembly and Servicing By Astronauts and Robots

    NASA Technical Reports Server (NTRS)

    Purves, Lloyd R.; Benfield, Mark (Technical Monitor)

    2002-01-01

    One aspect of designing future space missions is to determine whether Space Assembly and Servicing (SAS) is useful and, if so, what combination of robots and astronauts provides the most effective means of accomplishing it. Certain aspects of these choices, such as the societal value of developing the means for humans to live in space, do not lend themselves to quantification. However, other SAS costs and benefits can be quantified in a manner that can help select the most cost-effective SAS approach. Any space facility, whether it is assembled and serviced or not, entails an eventual replacement cost due to wear and obsolescence. Servicing can reduce this cost by limiting replacement to only failed or obsolete components. However, servicing systems, such as space robots, have their own logistics cost, and astronauts can have even greater logistics requirements. On the other hand, humans can be more capable than robots at performing dexterous and unstructured tasks, which can reduce logistics costs by allowing a reduction in mass of replacement components. Overall, the cost-effectiveness of astronaut SAS depends on its efficiency; and, if astronauts have to be wholly justified by their servicing usefulness, then the serviced space facility has to be large enough to fully occupy them.

  2. Space technology test facilities at the NASA Ames Research Center

    NASA Technical Reports Server (NTRS)

    Gross, Anthony R.; Rodrigues, Annette T.

    1990-01-01

    The major space research and technology test facilities at the NASA Ames Research Center are divided into five categories: General Purpose, Life Support, Computer-Based Simulation, High Energy, and the Space Exploraton Test Facilities. The paper discusses selected facilities within each of the five categories and discusses some of the major programs in which these facilities have been involved. Special attention is given to the 20-G Man-Rated Centrifuge, the Human Research Facility, the Plant Crop Growth Facility, the Numerical Aerodynamic Simulation Facility, the Arc-Jet Complex and Hypersonic Test Facility, the Infrared Detector and Cryogenic Test Facility, and the Mars Wind Tunnel. Each facility is described along with its objectives, test parameter ranges, and major current programs and applications.

  3. 40 CFR 160.43 - Test system care facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... testing facility shall have a number of animal rooms or other test system areas separate from those... GOOD LABORATORY PRACTICE STANDARDS Facilities § 160.43 Test system care facilities. (a) A testing facility shall have a sufficient number of animal rooms or other test system areas, as needed, to ensure...

  4. 40 CFR 160.43 - Test system care facilities.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... testing facility shall have a number of animal rooms or other test system areas separate from those... GOOD LABORATORY PRACTICE STANDARDS Facilities § 160.43 Test system care facilities. (a) A testing facility shall have a sufficient number of animal rooms or other test system areas, as needed, to ensure...

  5. The SSMEPF opens with a ribbon-cutting ceremony

    NASA Technical Reports Server (NTRS)

    1998-01-01

    Participants in the ribbon cutting for KSC's new 34,600-square- foot Space Shuttle Main Engine Processing Facility (SSMEPF) gather to talk inside the facility following the ceremony. From left, they are Robert B. Sieck, director of Shuttle Processing; KSC Center Director Roy D. Bridges Jr.; U.S. Congressman Dave Weldon; John Plowden, vice president of Rocketdyne; and Donald R. McMonagle, manager of Launch Integration. A major addition to the existing Orbiter Processing Facility Bay 3, the SSMEPF replaces the Shuttle Main Engine Shop located in the Vehicle Assembly Building (VAB). The decision to move the shop out of the VAB was prompted by safety considerations and recent engine processing improvements. The first three main engines to be processed in the new facility will fly on Shuttle Endeavour's STS-88 mission in December 1998.

  6. Rehabilitation consumers' use and understanding of quality information: a health literacy perspective.

    PubMed

    Magasi, Susan; Durkin, Elizabeth; Wolf, Michael S; Deutsch, Anne

    2009-02-01

    To explore consumers' use and understanding of quality information about postacute rehabilitation facilities. Thematic, semistructured interviews. Two skilled nursing facilities and 2 inpatient rehabilitation facilities in a large Midwestern city. Rehabilitation inpatients (n=17) with stroke, hip fractures, and joint replacements and care partners (n=12) of rehabilitation inpatients. None. None. Health literacy imposed barriers to participants' understanding of quality information. Using the Institute of Medicine's Health Literacy Framework, we identified specific barriers that limited participants' abilities to (1) obtain quality information, (2) process and understand quality information, and (3) make appropriate decisions about the quality of a rehabilitation facility. Participants tended to rely on informal and nonquality information when choosing a rehabilitation facility. Given the barriers imposed by low health literacy, rehabilitation providers have a responsibility to present quality information in a way that consumers, especially those with low health literacy, can use and understand.

  7. Reconstruction of 3d Objects of Assets and Facilities by Using Benchmark Points

    NASA Astrophysics Data System (ADS)

    Baig, S. U.; Rahman, A. A.

    2013-08-01

    Acquiring and modeling 3D geo-data of building assets and facility objects is one of the challenges. A number of methods and technologies are being utilized for this purpose. Total station, GPS, photogrammetric and terrestrial laser scanning are few of these technologies. In this paper, points commonly shared by potential facades of assets and facilities modeled from point clouds are identified. These points are useful for modeling process to reconstruct 3D models of assets and facilities stored to be used for management purposes. These models are segmented through different planes to produce accurate 2D plans. This novel method improves the efficiency and quality of construction of models of assets and facilities with the aim utilize in 3D management projects such as maintenance of buildings or group of items that need to be replaced, or renovated for new services.

  8. Landlord project multi-year program plan, fiscal year 1999, WBS 1.5

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dallas, M.D.

    The MYWP technical baseline describes the work to be accomplished by the Project and the technical standards which govern that work. The mission of Landlord Project is to provide more maintenance replacement of general infrastructure facilities and systems to facilitate the Hanford Site cleanup mission. Also, once an infrastructure facility or system is no longer needed the Landlord Project transitions the facility to final closure/removal through excess, salvage or demolition. Landlord Project activities will be performed in an environmentally sound, safe, economical, prudent, and reliable manner. The Landlord Project consists of the following facilities systems: steam, water, liquid sanitary waste,more » electrical distribution, telecommunication, sanitary landfill, emergency services, general purpose offices, general purpose shops, general purpose warehouses, environmental supports facilities, roads, railroad, and the site land. The objectives for general infrastructure support are reflected in two specific areas, (1) Core Infrastructure Maintenance, and (2) Infrastructure Risk Mitigation.« less

  9. Administrator's Guide to Technology: Planning, Funding & Implementation.

    ERIC Educational Resources Information Center

    Aspen Education Development Group, Gaithersburg, MD.

    This document provides guidelines for administrators related to instructional technology and planning. Chapter 1 discusses planning, including developing a technology plan, facility assessment, e-rate planning, formation of a technology committee, budget planning, and hardware/software replacement plan and costs. Chapter 2 addresses…

  10. 76 FR 80926 - Dominion Transmission, Inc; Notice of Request Under Blanket Authorization

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-27

    ... approximately 735 feet of 8-inch diameter TL-369 Ext. 2 receiver pipeline facilities; and (3) construct two new... proposes to: (1) Replace approximately 14.98 miles of it's existing multi-diameter (12, 14, and 16-inch) TL...

  11. 32 CFR 260.6 - Procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... period of time subject to suspension or termination upon failure to comply with agreed-upon terms. It... sanitation and the maintenance of vending facilities and vending machines in an orderly condition at all times, and the installation, maintenance, repair, replacement, servicing, and removal of vending...

  12. 32 CFR 260.6 - Procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... period of time subject to suspension or termination upon failure to comply with agreed-upon terms. It... sanitation and the maintenance of vending facilities and vending machines in an orderly condition at all times, and the installation, maintenance, repair, replacement, servicing, and removal of vending...

  13. 41 CFR 109-1.5303 - Procedures.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... a larger assembly, a complex operating system, or an older facility. The review of this property will be completed, prior to disposition, when replacing components or when operating systems and... Section 109-1.5303 Public Contracts and Property Management Federal Property Management Regulations System...

  14. 41 CFR 109-1.5303 - Procedures.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... a larger assembly, a complex operating system, or an older facility. The review of this property will be completed, prior to disposition, when replacing components or when operating systems and... Section 109-1.5303 Public Contracts and Property Management Federal Property Management Regulations System...

  15. 41 CFR 109-1.5303 - Procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... a larger assembly, a complex operating system, or an older facility. The review of this property will be completed, prior to disposition, when replacing components or when operating systems and... Section 109-1.5303 Public Contracts and Property Management Federal Property Management Regulations System...

  16. 41 CFR 109-1.5303 - Procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... a larger assembly, a complex operating system, or an older facility. The review of this property will be completed, prior to disposition, when replacing components or when operating systems and... Section 109-1.5303 Public Contracts and Property Management Federal Property Management Regulations System...

  17. 41 CFR 109-1.5303 - Procedures.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... a larger assembly, a complex operating system, or an older facility. The review of this property will be completed, prior to disposition, when replacing components or when operating systems and... Section 109-1.5303 Public Contracts and Property Management Federal Property Management Regulations System...

  18. 30 CFR 285.532 - What happens if my surety wants to terminate the period of liability of my bond?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... provide a replacement bond or alternative form of financial assurance of equivalent or greater value. The... SERVICE, DEPARTMENT OF THE INTERIOR OFFSHORE RENEWABLE ENERGY ALTERNATE USES OF EXISTING FACILITIES ON THE...

  19. 10 CFR 26.123 - Testing facility capabilities.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Testing facility capabilities. 26.123 Section 26.123 Energy NUCLEAR REGULATORY COMMISSION FITNESS FOR DUTY PROGRAMS Licensee Testing Facilities § 26.123 Testing facility capabilities. Each licensee testing facility shall have the capability, at the same...

  20. 10 CFR 26.123 - Testing facility capabilities.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Testing facility capabilities. 26.123 Section 26.123 Energy NUCLEAR REGULATORY COMMISSION FITNESS FOR DUTY PROGRAMS Licensee Testing Facilities § 26.123 Testing facility capabilities. Each licensee testing facility shall have the capability, at the same...

  1. 10 CFR 26.123 - Testing facility capabilities.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false Testing facility capabilities. 26.123 Section 26.123 Energy NUCLEAR REGULATORY COMMISSION FITNESS FOR DUTY PROGRAMS Licensee Testing Facilities § 26.123 Testing facility capabilities. Each licensee testing facility shall have the capability, at the same...

  2. 10 CFR 26.123 - Testing facility capabilities.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Testing facility capabilities. 26.123 Section 26.123 Energy NUCLEAR REGULATORY COMMISSION FITNESS FOR DUTY PROGRAMS Licensee Testing Facilities § 26.123 Testing facility capabilities. Each licensee testing facility shall have the capability, at the same...

  3. 10 CFR 26.123 - Testing facility capabilities.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Testing facility capabilities. 26.123 Section 26.123 Energy NUCLEAR REGULATORY COMMISSION FITNESS FOR DUTY PROGRAMS Licensee Testing Facilities § 26.123 Testing facility capabilities. Each licensee testing facility shall have the capability, at the same...

  4. Implementation of flowsheet change to minimize hydrogen and ammonia generation during chemical processing of high level waste in the Defense Waste Processing Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lambert, Dan P.; Woodham, Wesley H.; Williams, Matthew S.

    Testing was completed to develop a chemical processing flowsheet for the Defense Waste Processing Facility (DWPF), designed to vitrify and stabilize high level radioactive waste. DWPF processing uses a reducing acid (formic acid) and an oxidizing acid (nitric acid) to rheologically thin the slurry and complete the necessary acid base and reduction reactions (primarily mercury and manganese). Formic acid reduces mercuric oxide to elemental mercury, allowing the mercury to be removed during the boiling phase of processing through steam stripping. In runs with active catalysts, formic acid can decompose to hydrogen and nitrate can be reduced to ammonia, both flammablemore » gases, due to rhodium and ruthenium catalysis. Replacement of formic acid with glycolic acid eliminates the generation of rhodium- and ruthenium-catalyzed hydrogen and ammonia. In addition, mercury reduction is still effective with glycolic acid. Hydrogen, ammonia and mercury are discussed in the body of the report. Ten abbreviated tests were completed to develop the operating window for implementation of the flowsheet and determine the impact of changes in acid stoichiometry and the blend of nitric and glycolic acid as it impacts various processing variables over a wide processing region. Three full-length 4-L lab-scale simulations demonstrated the viability of the flowsheet under planned operating conditions. The flowsheet is planned for implementation in early 2017.« less

  5. Advanced Coal Liquefaction Research and Development Facility, Wilsonville, Alabama. Run 262 with Black Thunder subbituminous coal: Technical progress report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This report presents the results of Run 262 performed at the Advanced Coal Liquefaction R&D Facility in Wilsonville, Alabama. The run started on July 10, 1991 and continued until September 30, 1991, operating in the Close-Coupled Integrated Two-Stage Liquefaction mode processing Black Thunder Mine subbituminous coal (Wyodak-Anderson seam from Wyoming Powder River Basin). A dispersed molybdenum catalyst was evaluated for its performance. The effect of the dispersed catalyst on eliminating solids buildup was also evaluated. Half volume reactors were used with supported Criterion 324 1/16`` catalyst in the second stage at a catalyst replacement rate of 3 lb/ton of MFmore » coal. The hybrid dispersed plus supported catalyst system was tested for the effect of space velocity, second stage temperature, and molybdenum concentration. The supported catalyst was removed from the second stage for one test period to see the performance of slurry reactors. Iron oxide was used as slurry catalyst at a rate of 2 wt % MF coal throughout the run (dimethyl disulfide (DMDS) was used as the sulfiding agent). The close-coupled reactor unit was on-stream for 1271.2 hours for an on-stream factor of 89.8% and the ROSE-SR unit was on-feed for 1101.6 hours for an on-stream factor of 90.3% for the entire run.« less

  6. KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility, astronaut Stephen Frick and STS-114 Mission Specialist Wendy Lawrence watch as crew members work with equipment that will be used on the mission. Frick is a tile specialist, who joined the STS-114 crew during equipment familiarization at KSC. STS-114 is classified as Logistics Flight 1 to the International Space Station, delivering new supplies and replacing one of the orbital outpost’s Control Moment Gyroscopes (CMGs). STS-114 will also carry a Raffaello Multi-Purpose Logistics Module and the External Stowage Platform-2. The crew is slated to conduct at least three spacewalks: They will demonstrate repair techniques of the Shuttle’s Thermal Protection System, replace the failed CMG with one delivered by the Shuttle, and install the External Stowage Platform.

    NASA Image and Video Library

    2004-01-27

    KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility, astronaut Stephen Frick and STS-114 Mission Specialist Wendy Lawrence watch as crew members work with equipment that will be used on the mission. Frick is a tile specialist, who joined the STS-114 crew during equipment familiarization at KSC. STS-114 is classified as Logistics Flight 1 to the International Space Station, delivering new supplies and replacing one of the orbital outpost’s Control Moment Gyroscopes (CMGs). STS-114 will also carry a Raffaello Multi-Purpose Logistics Module and the External Stowage Platform-2. The crew is slated to conduct at least three spacewalks: They will demonstrate repair techniques of the Shuttle’s Thermal Protection System, replace the failed CMG with one delivered by the Shuttle, and install the External Stowage Platform.

  7. KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility, STS-114 Mission Specialists Andrew Thomas (center) and Soichi Noguchi (right) work with equipment while Mission Specialist Charles Camarda (left) watches. Noguchi is with the Japanese Aerospace Exploration Agency (JAXA). They and other crew members are at KSC for equipment familiarization. STS-114 is classified as Logistics Flight 1 to the International Space Station, delivering new supplies and replacing one of the orbital outpost’s Control Moment Gyroscopes (CMGs). STS-114 will also carry a Raffaello Multi-Purpose Logistics Module and the External Stowage Platform-2. The crew is slated to conduct at least three spacewalks: They will demonstrate repair techniques of the Shuttle’s Thermal Protection System, replace the failed CMG with one delivered by the Shuttle, and install the External Stowage Platform.

    NASA Image and Video Library

    2004-01-27

    KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility, STS-114 Mission Specialists Andrew Thomas (center) and Soichi Noguchi (right) work with equipment while Mission Specialist Charles Camarda (left) watches. Noguchi is with the Japanese Aerospace Exploration Agency (JAXA). They and other crew members are at KSC for equipment familiarization. STS-114 is classified as Logistics Flight 1 to the International Space Station, delivering new supplies and replacing one of the orbital outpost’s Control Moment Gyroscopes (CMGs). STS-114 will also carry a Raffaello Multi-Purpose Logistics Module and the External Stowage Platform-2. The crew is slated to conduct at least three spacewalks: They will demonstrate repair techniques of the Shuttle’s Thermal Protection System, replace the failed CMG with one delivered by the Shuttle, and install the External Stowage Platform.

  8. KENNEDY SPACE CENTER, FLA. - Dressed in protective suits, STS-114 Mission Specialist Andrew Thomas (left) and Soichi Noguchi, who is with the Japanese Aerospace Exploration Agency (JAXA), handle equipment in the Space Station Processing Facility that will be used on the mission. They and other crew members are at KSC for equipment familiarization. STS-114 is classified as Logistics Flight 1 to the International Space Station, delivering new supplies and replacing one of the orbital outpost’s Control Moment Gyroscopes (CMGs). STS-114 will also carry a Raffaello Multi-Purpose Logistics Module and the External Stowage Platform-2. The crew is slated to conduct at least three spacewalks: They will demonstrate repair techniques of the Shuttle’s Thermal Protection System, replace the failed CMG with one delivered by the Shuttle, and install the External Stowage Platform.

    NASA Image and Video Library

    2004-01-27

    KENNEDY SPACE CENTER, FLA. - Dressed in protective suits, STS-114 Mission Specialist Andrew Thomas (left) and Soichi Noguchi, who is with the Japanese Aerospace Exploration Agency (JAXA), handle equipment in the Space Station Processing Facility that will be used on the mission. They and other crew members are at KSC for equipment familiarization. STS-114 is classified as Logistics Flight 1 to the International Space Station, delivering new supplies and replacing one of the orbital outpost’s Control Moment Gyroscopes (CMGs). STS-114 will also carry a Raffaello Multi-Purpose Logistics Module and the External Stowage Platform-2. The crew is slated to conduct at least three spacewalks: They will demonstrate repair techniques of the Shuttle’s Thermal Protection System, replace the failed CMG with one delivered by the Shuttle, and install the External Stowage Platform.

  9. Menopausal Symptom Relief and Side Effects Experienced by Women Using Bioidentical Hormone Replacement Therapy and Synthetic Conjugated Equine Estrogen and/or Progestin Hormone Replacement Therapy, Part 1.

    PubMed

    Deleruyelle, Laura J

    2016-01-01

    The use of compounded bioidentical hormone replacement therapy by menopausal women has become a popular alternative to traditional synthetic conjugated equine estrogen and progestin hormone replacement therapy due to safety concerns raised by recent studies. However, due to the lack of randomized, large-scale trials to evaluate the efficacy and side-effect profile of compounded bioidentical hormone replacement therapy many healthcare providers are reluctant to prescribe such therapy. The purpose of this study was to compare women's menopausal symptom relief and side effects experienced when using compounded bioidentical hormone replacement therapy and traditional hormone replacement therapy. A descriptive comparative design was used. Inferential and descriptive statistical procedures including a paired difference t -test, two-sample t -test, and f tests (percentage, mean, standard deviation, frequency) were run on the Statistical Package for the Social Sciences. The framework used to guide this study was Lenz and Pugh's Theory of Unpleasant Symptoms. Surveys were distributed once to a convenient sample of women aged 35 and older when they dropped off or picked up their prescriptions at a pharmacy. Of the 216 surveys distributed, 70 were returned from those women taking compounded bioidentical hormone replacement therapy and 53 from traditional hormone replacement therapy. The survey contained 15 questions pertaining to age, duration of hormone replacement therapy, type and formulation of hormone replacement therapy, reasons for initiating hormone replacement therapy, symptoms before and one month after hormone replacement therapy, and side effects related to hormone replacement therapy. The results of this study will be summarized in forthcoming articles in this series. Copyright© by International Journal of Pharmaceutical Compounding, Inc.

  10. KSC01pp0174

    NASA Image and Video Library

    2001-01-15

    Members of the STS-102 crew check out Discovery’s payload bay in the Orbiter Processing Facility bay 1. Dressed in green, they are Mission Specialist Paul W. Richards (left) and Pilot James W. Kelly. The crew is at KSC for Crew Equipment Interface Test activities. Above their heads on the left side are two of the experiments being carried on the flight. STS-102 is the 8th construction flight to the International Space Station and will carry the Multi-Purpose Logistics Module Leonardo. STS-102 is scheduled for launch March 1, 2001. On that flight, Leonardo will be filled with equipment and supplies to outfit the U.S. laboratory module Destiny. The mission will also be carrying the Expedition Two crew to the Space Station, replacing the Expedition One crew who will return on Shuttle Discovery

  11. KSC01pp0173

    NASA Image and Video Library

    2001-01-15

    Members of the STS-102 crew check out Discovery’s payload bay in the Orbiter Processing Facility bay 1. Dressed in green, they are Mission Specialist Paul W. Richards (left) and Pilot James W. Kelly. The crew is at KSC for Crew Equipment Interface Test activities. Above their heads on the left side are two of the experiments being carried on the flight. STS-102 is the 8th construction flight to the International Space Station and will carry the Multi-Purpose Logistics Module Leonardo. STS-102 is scheduled for launch March 1, 2001. On that flight, Leonardo will be filled with equipment and supplies to outfit the U.S. laboratory module Destiny. The mission will also be carrying the Expedition Two crew to the Space Station, replacing the Expedition One crew who will return on Shuttle Discovery

  12. KSC-02pd0032

    NASA Image and Video Library

    2002-01-17

    KENNEDY SPACE CENTER, FLA. -- In the Vertical Processing Facility, workers help guide the Near Infrared Camera and Multi-Object Spectrometer (NICMOS) Cooling System into an protective enclosure on a payload carrier. NICMOS II is part of the payload on mission STS-109, the Hubble Servicing Telescope Mission. It is a new experimental cooling system consisting of a compressor and tiny turbines. With the experimental cryogenic system, NASA hopes to re-cool the infrared detectors to below -315 degrees F (-193 degrees Celsius). NICMOS II was previously tested aboard STS-95 in 1998. It could extend the life of the Hubble Space Telescope by several years. Astronauts aboard Columbia on mission STS-109 will be replacing the original NICMOS with the newer version. Launch of mission STS-109 is scheduled for Feb. 28, 2002

  13. Comprehensive facilities plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-09-01

    The Ernest Orlando Lawrence Berkeley National Laboratory`s Comprehensive Facilities Plan (CFP) document provides analysis and policy guidance for the effective use and orderly future development of land and capital assets at the Berkeley Lab site. The CFP directly supports Berkeley Lab`s role as a multiprogram national laboratory operated by the University of California (UC) for the Department of Energy (DOE). The CFP is revised annually on Berkeley Lab`s Facilities Planning Website. Major revisions are consistent with DOE policy and review guidance. Facilities planing is motivated by the need to develop facilities for DOE programmatic needs; to maintain, replace and rehabilitatemore » existing obsolete facilities; to identify sites for anticipated programmatic growth; and to establish a planning framework in recognition of site amenities and the surrounding community. The CFP presents a concise expression of the policy for the future physical development of the Laboratory, based upon anticipated operational needs of research programs and the environmental setting. It is a product of the ongoing planning processes and is a dynamic information source.« less

  14. Design, Fabrication and Integration of a NaK-Cooled Circuit

    NASA Technical Reports Server (NTRS)

    Garber, Anne; Godfroy, Thomas

    2006-01-01

    The Early Flight Fission Test Facilities (EFF-TF) team has been tasked by the NASA Marshall Space Flight Center Nuclear Systems Office to design, fabricate, and test an actively pumped alkali metal flow circuit. The system, which was originally designed for use with a eutectic mixture of sodium potassium (NaK), was redesigned to for use with lithium. Due to a shi$ in focus, it is once again being prepared for use with NaK. Changes made to the actively pumped, high temperature circuit include the replacement of the expansion reservoir, addition of remotely operated valves, and modification of the support table. Basic circuit components include: reactor segment, NaK to gas heat exchanger, electromagnetic (EM) liquid metal pump, load/drain reservoir, expansion reservoir, instrumentation, and a spill reservoir. A 37-pin partial-array core (pin and flow path dimensions are the same as those in a fill design) was selected for fabrication and test. This paper summarizes the integration and preparations for the fill of the pumped liquid metal NaK flow circuit.

  15. Pre-conceptual Development and characterization of an extruded graphite composite fuel for the TREAT Reactor

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Luther, Erik; Rooyen, Isabella van; Leckie, Rafael

    2015-03-01

    In an effort to explore fuel systems that are more robust under accident scenarios, the DOE-NE has identified the need to resume transient testing. The Transient Reactor Test (TREAT) facility has been identified as the preferred option for the resumption of transient testing of nuclear fuel in the United States. In parallel, NNSA’s Global Threat Reduction Initiative (GTRI) Convert program is exploring the needs to replace the existing highly enriched uranium (HEU) core with low enriched uranium (LEU) core. In order to construct a new LEU core, materials and fabrication processes similar to those used in the initial core fabricationmore » must be identified, developed and characterized. In this research, graphite matrix fuel blocks were extruded and materials properties of were measured. Initially the extrusion process followed the historic route; however, the project was expanded to explore methods to increase the graphite content of the fuel blocks and explore modern resins. Materials properties relevant to fuel performance including density, heat capacity and thermal diffusivity were measured. The relationship between process defects and materials properties will be discussed.« less

  16. The WCSAR telerobotics test bed

    NASA Technical Reports Server (NTRS)

    Duffie, N.; Zik, J.; Teeter, R.; Crabb, T.

    1988-01-01

    Component technologies for use in telerobotic systems for space are being developed. As part of this effort, a test bed was established in which these technologies can be verified and integrated into telerobotic systems. The facility consists of two slave industrial robots, an articulated master arm controller, a cartesian coordinate master arm controller, and a variety of sensors, displays and stimulators for feedback to human operators. The controller of one of the slave robots remains in its commercial state, while the controller of the other robot has been replaced with a new controller that achieves high-performance in telerobotic operating modes. A dexterous slave hand which consists of two fingers and a thumb is being developed, along with a number of force-reflecting and non-force reflecting master hands, wrists and arms. A tactile sensing finger tip based on piezo-film technology has been developed, along with tactile stimulators and CAD-based displays for sensory feedback and sensory substitution. The telerobotics test bed and its component technologies are described, as well as the integration of these component technologies into telerobotic systems, and their performance in conjunction with human operators.

  17. Test results of a 20 kA high temperature superconductor current lead using REBCO tapes

    NASA Astrophysics Data System (ADS)

    Heller, R.; Fietz, W. H.; Gröner, F.; Heiduk, M.; Hollik, M.; Lange, C.; Lietzow, R.

    2018-05-01

    The Karlsruhe Institute of Technology has developed a 20 kA high temperature superconductor (HTS) current lead (CL) using the second generation material REBCO, as industry worldwide concentrate on the production of this material. The aim was to demonstrate the possibility of replacing the Bi-2223/AgAu tapes by REBCO tapes, while for easy comparison of results, all other components are copies of the 20 kA HTS CL manufactured for the satellite tokamak JT-60SA. After the manufacture of all CL components including the newly developed REBCO module, the assembly of the CL has been executed at KIT and an experiment has been carried out in the CuLTKa test facility where the REBCO CL was installed and connected to a JT-60SA CL via a superconducting bus bar. The experiment covers steady state operation up to 20 kA, pulsed operation, measurement of the heat load at 4.5 K end, loss-of-flow-accident simulations, and quench performance studies. Here the results of these tests are reported and directly compared to those of the JT-60SA CL.

  18. KSC-08pd2084

    NASA Image and Video Library

    2008-07-18

    CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, the Orbital Replacement Unit Carrier, for the Hubble Space Telescope is unwrapped and awaits final processing for launch. The Orbital Replacement Unit Carrier, or ORUC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Flight Support System, or FSS, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller

  19. Improvement of the High Fluence Irradiation Facility at the University of Tokyo

    NASA Astrophysics Data System (ADS)

    Murakami, Kenta; Iwai, Takeo; Abe, Hiroaki; Sekimura, Naoto

    2016-08-01

    This paper reports the modification of the High Fluence Irradiation Facility at the University of Tokyo (HIT). The HIT facility was severely damaged during the 2011 earthquake, which occurred off the Pacific coast of Tohoku. A damaged 1.0 MV tandem Cockcroft-Walton accelerator was replaced with a 1.7 MV accelerator, which was formerly used in another campus of the university. A decision was made to maintain dual-beam irradiation capability by repairing the 3.75 MV single-ended Van de Graaff accelerator and reconstructing the related beamlines. A new beamline was connected with a 200 kV transmission electron microscope (TEM) to perform in-situ TEM observation under ion irradiation.

  20. Situation awareness in airway facilities : replacement of maintenance control centers with operations control centers.

    DOT National Transportation Integrated Search

    2000-01-01

    This document contains an updated and expanded version of the Automation chapter of the Human Factors Design Guide. A research team of human factors experts evaluated the existing guidelines for relevance, clarity, and usability. The research team dr...

  1. Kuipers during replacement of the Marangoni Surface Fluid Dynamics Experiment

    NASA Image and Video Library

    2012-03-15

    ISS030-E-142827 (15 March 2012) --- European Space Agency astronaut Andre Kuipers, Expedition 30 flight engineer, works to remove the Marangoni Surface fluid physics experiment from the Fluid Physics Experiment Facility (FPEF) in the Kibo laboratory of the International Space Station.

  2. 76 FR 41154 - Review and Approval of Projects

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-13

    ... development project to an out-of-basin treatment or disposal facility; insert language authorizing ``renewal... formations that may be the subject of natural gas development using hydrofracture stimulation and replace with a generic category-- ``unconventional natural gas development;'' broaden the scope of ABRs issued...

  3. 36 CFR 59.3 - Conversion requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... not been dedicated or managed for recreation/conservation use may be used as replacement land even if... proposed conversion and substitution constitute significant changes to the original Land and Water... approval is not necessarily required, however, for each and every facility use change. Rather, a project...

  4. Considerations When Upgrading and Renovating Window Systems

    ERIC Educational Resources Information Center

    Gille, Steve

    2010-01-01

    Today's educational facilities managers face many challenges. As stewards of their campus' physical assets, these professionals are charged with improving students' learning environments, saving money, and maintaining the historical and aesthetic integrity of their buildings. For schools and universities that have not replaced their windows in…

  5. 78 FR 24765 - Notice of Intent To Close 16 Field Offices

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-26

    ... in current facilities through innovative approaches to space management and alternative workplace... eliminate the cost office space leases and administrative costs, including transit, mail, copiers... is based on GSA's ability to find a replacement lessee for the office space. ii. Buyout cost...

  6. 39 CFR 501.14 - Postage Evidencing System inventory control processes.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 39 Postal Service 1 2011-07-01 2011-07-01 false Postage Evidencing System inventory control... control processes. (a) Each authorized provider of Postage Evidencing Systems must permanently hold title... sufficient facilities for and records of the distribution, control, storage, maintenance, repair, replacement...

  7. 77 FR 27740 - Privacy Act of 1974; System of Records

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-11

    ... storage media''. Retrievability: Delete ``and Social Security Number''. Safeguards: Delete last sentence...: * * * * * Categories of individuals covered by the system: Delete entry and replace with ``Children and their sponsors... admission to, DLA-managed day care facilities.'' Categories of records in the system: Delete ``Social...

  8. STS-114 Crew Interview: James M. Kelly, PLT

    NASA Technical Reports Server (NTRS)

    2003-01-01

    Pilot James M. Kelly, Lieutenant Colonel USAF, is shown during a prelaunch interview. He expresses the major goals of the mission which are to replace the Expedition Six crew of the International Space Station (ISS), install the Raffello Multi-Purpose Logistics Module, deliver the External Stowage Platform to the ISS, and replace the Control Moment Gyroscope (CMG). The major task that he has is to be the backup pilot for Commander Eileen Collins. He talks about the three new research racks brought up to the International Space Station inside the U.S. Destiny Laboratory along with the Window Observational Research Facility (WORF), Human Research Facility 2 (HRF-2), and a Minus Eighty Degree Laboratory Freezer (MELF-1). Kelly also explains how he uses the ISS' Robotic arm to lift the MPLM out of Atlantis' payload bay and attach it to the Unity node to unload hardware, supplies and maintenance items. This will be his second trip to the International Space Station.

  9. Preoperational Subsurface Conditions at the Idaho Nuclear Technology and Engineering Center Service Waste Disposal Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ansley, Shannon Leigh

    2002-02-01

    The Idaho Nuclear Technology and Engineering Center (INTEC) Service Wastewater Discharge Facility replaces the existing percolation ponds as a disposal facility for the INTEC Service Waste Stream. A preferred alternative for helping decrease water content in the subsurface near INTEC, closure of the existing ponds is required by the INTEC Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Record of Decision (ROD) for Waste Area Group 3 Operable Unit 3-13 (DOE-ID 1999a). By August 2002, the replacement facility was constructed approximately 2 miles southwest of INTEC, near the Big Lost River channel. Because groundwater beneath the Idaho National Engineering andmore » Environmental Laboratory (INEEL) is protected under Federal and State of Idaho regulations from degradation due to INEEL activities, preoperational data required by U.S. Department of Energy (DOE) Order 5400.1 were collected. These data include preexisting physical, chemical, and biological conditions that could be affected by the discharge; background levels of radioactive and chemical components; pertinent environmental and ecological parameters; and potential pathways for human exposure or environmental impact. This document presents specific data collected in support of DOE Order 5400.1, including: four quarters of groundwater sampling and analysis of chemical and radiological parameters; general facility description; site specific geology, stratigraphy, soils, and hydrology; perched water discussions; and general regulatory requirements. However, in order to avoid duplication of previous information, the reader is directed to other referenced publications for more detailed information. Documents that are not readily available are compiled in this publication as appendices. These documents include well and borehole completion reports, a perched water evaluation letter report, the draft INEEL Wellhead Protection Program Plan, and the Environmental Checklist.« less

  10. Thermal Characterization of Epoxy Adhesive by Hotfire Testing

    NASA Technical Reports Server (NTRS)

    Spomer, Ken A.; Haddock, M. Reed; McCool, Alex (Technical Monitor)

    2001-01-01

    This paper describes subscale solid-rocket motor hot-fire testing of epoxy adhesives in flame surface bondlines to evaluate heat-affected depth, char depth and ablation rate. Hot-fire testing is part of an adhesive down-selection program on the Space Shuttle Solid Rocket Motor Nozzle to provide additional confidence in the down-selected adhesives. The current nozzle structural adhesive bond system is being replaced due to obsolescence. Prior to hot-fire testing, adhesives were tested for chemical, physical and mechanical properties, which resulted in the selection of two potential replacement adhesives, Resin Technology Group's TIGA 321 and 3M's EC2615XLW. Hot-fire testing consisted of four forty-pound charge (FPC) motors fabricated in configurations that would allow side-by-side comparison testing of the candidate replacement adhesives with the current RSRM adhesives. Results of the FPC motor testing show that: 1) the phenolic char depths on radial bondlines is approximately the same and vary depending on the position in the blast tube regardless of which adhesive was used, 2) the replacement candidate adhesive char depths are equivalent to the char depths of the current adhesives, 3) the heat-affected depths of the candidate and current adhesives are equivalent, and 4) the ablation rates for both replacement adhesives were equivalent to the current adhesives.

  11. Accreditation status and geographic location of outpatient vascular testing facilities among Medicare beneficiaries: the VALUE (Vascular Accreditation, Location & Utilization Evaluation) study.

    PubMed

    Rundek, Tatjana; Brown, Scott C; Wang, Kefeng; Dong, Chuanhui; Farrell, Mary Beth; Heller, Gary V; Gornik, Heather L; Hutchisson, Marge; Needleman, Laurence; Benenati, James F; Jaff, Michael R; Meier, George H; Perese, Susana; Bendick, Phillip; Hamburg, Naomi M; Lohr, Joann M; LaPerna, Lucy; Leers, Steven A; Lilly, Michael P; Tegeler, Charles; Alexandrov, Andrei V; Katanick, Sandra L

    2014-10-01

    There is limited information on the accreditation status and geographic distribution of vascular testing facilities in the US. The Centers for Medicare & Medicaid Services (CMS) provide reimbursement to facilities regardless of accreditation status. The aims were to: (1) identify the proportion of Intersocietal Accreditation Commission (IAC) accredited vascular testing facilities in a 5% random national sample of Medicare beneficiaries receiving outpatient vascular testing services; (2) describe the geographic distribution of these facilities. The VALUE (Vascular Accreditation, Location & Utilization Evaluation) Study examines the proportion of IAC accredited facilities providing vascular testing procedures nationally, and the geographic distribution and utilization of these facilities. The data set containing all facilities that billed Medicare for outpatient vascular testing services in 2011 (5% CMS Outpatient Limited Data Set (LDS) file) was examined, and locations of outpatient vascular testing facilities were obtained from the 2011 CMS/Medicare Provider of Services (POS) file. Of 13,462 total vascular testing facilities billing Medicare for vascular testing procedures in a 5% random Outpatient LDS for the US in 2011, 13% (n=1730) of facilities were IAC accredited. The percentage of IAC accredited vascular testing facilities in the LDS file varied significantly by US region, p<0.0001: 26%, 12%, 11%, and 7% for the Northeast, South, Midwest, and Western regions, respectively. Findings suggest that the proportion of outpatient vascular testing facilities that are IAC accredited is low and varies by region. Increasing the number of accredited vascular testing facilities to improve test quality is a hypothesis that should be tested in future research. © The Author(s) 2014.

  12. EPA Facility Registry Service (FRS): ICIS

    EPA Pesticide Factsheets

    This web feature service contains location and facility identification information from EPA's Facility Registry Service (FRS) for the subset of facilities that link to the Integrated Compliance Information System (ICIS). When complete, ICIS will provide a database that will contain integrated enforcement and compliance information across most of EPA's programs. The vision for ICIS is to replace EPA's independent databases that contain enforcement data with a single repository for that information. Currently, ICIS contains all Federal Administrative and Judicial enforcement actions and a subset of the Permit Compliance System (PCS), which supports the National Pollutant Discharge Elimination System (NPDES). ICIS exchanges non-sensitive enforcement/compliance activities, non-sensitive formal enforcement actions and NPDES information with FRS. This web feature service contains the enforcement/compliance activities and formal enforcement action related facilities; the NPDES facilities are contained in the PCS_NPDES web feature service. FRS identifies and geospatially locates facilities, sites or places subject to environmental regulations or of environmental interest. Using vigorous verification and data management procedures, FRS integrates facility data from EPA's national program systems, other federal agencies, and State and tribal master facility records and provides EPA with a centrally managed, single source of comprehensive and authoritative information on f

  13. KSC-2009-2219

    NASA Image and Video Library

    2009-03-04

    CAPE CANAVERAL, Fla. – At the Astrotech payload processing facility in Titusville, Fla., technicians move the test stand with the GOES-O satellite. The satellite will undergo final testing of the imaging system, instrumentation, communications and power systems. The latest Geostationary Operational Environmental Satellite, GOES-O was developed by NASA for the National Oceanic and Atmospheric Administration, or NOAA. The GOES-O satellite is targeted to launch April 28 onboard a United Launch Alliance Delta IV expendable launch vehicle. Once in orbit, GOES-O will be designated GOES-14, and NASA will provide on-orbit checkout and then transfer operational responsibility to NOAA. GOES-O will be placed in on-orbit storage as a replacement for an older GOES satellite. GOES-O carries an advanced attitude control system using star trackers with spacecraft optical bench Imager and Sounder mountings that provide enhanced instrument pointing performance for improved image navigation and registration to better locate severe storms and other events important to the NOAA National Weather Service. Photo credit: NASA/Kim Shiflett

  14. KSC-2009-2218

    NASA Image and Video Library

    2009-03-04

    CAPE CANAVERAL, Fla. – At the Astrotech payload processing facility in Titusville, Fla., the GOES-O satellite is lowered toward a test stand. The satellite will undergo final testing of the imaging system, instrumentation, communications and power systems. The latest Geostationary Operational Environmental Satellite, GOES-O was developed by NASA for the National Oceanic and Atmospheric Administration, or NOAA. The GOES-O satellite is targeted to launch April 28 onboard a United Launch Alliance Delta IV expendable launch vehicle. Once in orbit, GOES-O will be designated GOES-14, and NASA will provide on-orbit checkout and then transfer operational responsibility to NOAA. GOES-O will be placed in on-orbit storage as a replacement for an older GOES satellite. GOES-O carries an advanced attitude control system using star trackers with spacecraft optical bench Imager and Sounder mountings that provide enhanced instrument pointing performance for improved image navigation and registration to better locate severe storms and other events important to the NOAA National Weather Service. Photo credit: NASA/Kim Shiflett

  15. Finite Element Based Optimization of Material Parameters for Enhanced Ballistic Protection

    NASA Astrophysics Data System (ADS)

    Ramezani, Arash; Huber, Daniel; Rothe, Hendrik

    2013-06-01

    The threat imposed by terrorist attacks is a major hazard for military installations, vehicles and other items. The large amounts of firearms and projectiles that are available, pose serious threats to military forces and even civilian facilities. An important task for international research and development is to avert danger to life and limb. This work will evaluate the effect of modern armor with numerical simulations. It will also provide a brief overview of ballistic tests in order to offer some basic knowledge of the subject, serving as a basis for the comparison of simulation results. The objective of this work is to develop and improve the modern armor used in the security sector. Numerical simulations should replace the expensive ballistic tests and find vulnerabilities of items and structures. By progressively changing the material parameters, the armor is to be optimized. Using a sensitivity analysis, information regarding decisive variables is yielded and vulnerabilities are easily found and eliminated afterwards. To facilitate the simulation, advanced numerical techniques have been employed in the analyses.

  16. Design and Characterization of the UTIAS Anechoic Wind Tunnel

    NASA Astrophysics Data System (ADS)

    Chow, Derrick H. F.

    The anechoic open-jet wind tunnel facility at the University of Toronto Institute for Aerospace Studies was updated and characterized to meet the needs of current and future aeroacoustic experiments. The wind tunnel inlet was resurfaced and flow-conditioning screens were redesigned to improve the freestream turbulence intensity to below 0.4% in the test section. The circular nozzle was replaced with a square secondary contraction that increased the maximum test section velocity to 75 m/s and improved flow uniformity to over 99% across a usable cross-sectional area of 500 mm x 500 mm. Acoustic baffles were installed in front of the wind tunnel inlet and foam wedges were installed in the anechoic chamber. The overall background sound pressure levels in the chamber were improved by 8-18 db over the range of operational freestream velocities. The anechoic chamber cut-off frequency is 170 Hz and the reverberation time for a 60 dB sound power decay is 0.032 s.

  17. Hybrid Gear Performance Under Loss-of-Lubrication Conditions

    NASA Technical Reports Server (NTRS)

    Laberge, Kelsen E.; Berkebile, Stephen P.; Handschuh, Robert F.; Roberts, Gary D.

    2017-01-01

    Hybrid composite gear technology is being investigated to increase power density in rotorcraft drive systems. These gears differ from conventional steel gears in that the structural web material is replaced with a lightweight carbon fiber composite. Past studies have focused on performance of this technology under normal operating conditions, however, for this technology to be viable it must also withstand adverse conditions. The study presented here evaluates the performance of hybrid gears under loss-of-lubrication conditions in NASA Glenn Research Centers Contact Fatigue Test Facility. Two experiments are presented using small-scale 3.5 inch (8.9 cm) pitch diameter hybrid gears and compared to a baseline steel gear pair. Results of these tests show that there are limitations to the use of a hexagonal interlock pattern between the steel and composite. There is also evidence that the presence of polymer in the gear during an oil out event has a potential to increase time to failure. Further studies are planned to expand on these initial findings.

  18. EPA Facility Registry Service (FRS): PCS_NPDES

    EPA Pesticide Factsheets

    This web feature service contains location and facility identification information from EPA's Facility Registry Service (FRS) for the subset of facilities that link to the Permit Compliance System (PCS) or the National Pollutant Discharge Elimination System (NPDES) module of the Integrated Compliance Information System (ICIS). PCS tracks NPDES surface water permits issued under the Clean Water Act. This system is being incrementally replaced by the NPDES module of ICIS. Under NPDES, all facilities that discharge pollutants from any point source into waters of the United States are required to obtain a permit. The permit will likely contain limits on what can be discharged, impose monitoring and reporting requirements, and include other provisions to ensure that the discharge does not adversely affect water quality. FRS identifies and geospatially locates facilities, sites or places subject to environmental regulations or of environmental interest. Using vigorous verification and data management procedures, FRS integrates facility data from EPA's national program systems, other federal agencies, and State and tribal master facility records and provides EPA with a centrally managed, single source of comprehensive and authoritative information on facilities. This data set contains the subset of FRS integrated facilities that link to NPDES facilities once the PCS or ICIS-NPDES data has been integrated into the FRS database. Additional information on FRS is available

  19. Development of laboratory test methods to replace the simulated high-temperature grout fluidity test.

    DOT National Transportation Integrated Search

    2014-06-01

    This report contains a summary of the research performed to develop a replacement for the high-temperature grout : fluidity (HTGF) test. The HTGF test was employed in the past by FDOT to qualify post-tensioning (PT) grouts for use in : post-tensioned...

  20. Research and test facilities

    NASA Technical Reports Server (NTRS)

    1993-01-01

    A description is given of each of the following Langley research and test facilities: 0.3-Meter Transonic Cryogenic Tunnel, 7-by 10-Foot High Speed Tunnel, 8-Foot Transonic Pressure Tunnel, 13-Inch Magnetic Suspension & Balance System, 14-by 22-Foot Subsonic Tunnel, 16-Foot Transonic Tunnel, 16-by 24-Inch Water Tunnel, 20-Foot Vertical Spin Tunnel, 30-by 60-Foot Wind Tunnel, Advanced Civil Transport Simulator (ACTS), Advanced Technology Research Laboratory, Aerospace Controls Research Laboratory (ACRL), Aerothermal Loads Complex, Aircraft Landing Dynamics Facility (ALDF), Avionics Integration Research Laboratory, Basic Aerodynamics Research Tunnel (BART), Compact Range Test Facility, Differential Maneuvering Simulator (DMS), Enhanced/Synthetic Vision & Spatial Displays Laboratory, Experimental Test Range (ETR) Flight Research Facility, General Aviation Simulator (GAS), High Intensity Radiated Fields Facility, Human Engineering Methods Laboratory, Hypersonic Facilities Complex, Impact Dynamics Research Facility, Jet Noise Laboratory & Anechoic Jet Facility, Light Alloy Laboratory, Low Frequency Antenna Test Facility, Low Turbulence Pressure Tunnel, Mechanics of Metals Laboratory, National Transonic Facility (NTF), NDE Research Laboratory, Polymers & Composites Laboratory, Pyrotechnic Test Facility, Quiet Flow Facility, Robotics Facilities, Scientific Visualization System, Scramjet Test Complex, Space Materials Research Laboratory, Space Simulation & Environmental Test Complex, Structural Dynamics Research Laboratory, Structural Dynamics Test Beds, Structures & Materials Research Laboratory, Supersonic Low Disturbance Pilot Tunnel, Thermal Acoustic Fatigue Apparatus (TAFA), Transonic Dynamics Tunnel (TDT), Transport Systems Research Vehicle, Unitary Plan Wind Tunnel, and the Visual Motion Simulator (VMS).

  1. Replacement Windows Define the Newly Renovated Fiterman Hall.

    ERIC Educational Resources Information Center

    Ladesich, Jim

    2000-01-01

    Explores the planning and testing involved in successfully replacing windows in a corporate office building converted into an academic building. Inspection procedures and performance testing are examined. (GR)

  2. KSC-08pd2355

    NASA Image and Video Library

    2008-08-08

    CAPE CANAVERAL, Fla. – In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, workers lift the Fine Guidance Sensor Scientific Instrument Protective Enclosure, or FSIPE, cover before attaching a crane. The cover will be installed on the Orbital Replacement Unit Carrier, or ORUC. The ORUC is one of three carriers that are being prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the fifth and final Hubble servicing mission, STS-125. Launch is targeted for Oct. 8. PHoto credit: NASA/Jack Pfaller

  3. KSC-08pd2356

    NASA Image and Video Library

    2008-08-08

    CAPE CANAVERAL, Fla. – In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, an overhead crane moves the Fine Guidance Sensor Scientific Instrument Protective Enclosure, or FSIPE, cover to be installed on the Orbital Replacement Unit Carrier, or ORUC, below. The ORUC is one of three carriers that are being prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the fifth and final Hubble servicing mission, STS-125. Launch is targeted for Oct. 8. PHoto credit: NASA/Jack Pfaller

  4. A rare case of prosthetic endocarditis and dehiscence in a mechanical valved conduit

    PubMed Central

    Kannan, Arun; Smith, Cristy; Subramanian, Sreekumar; Janardhanan, Rajesh

    2014-01-01

    A middle-aged adult patient with a history of aortic root replacement with a mechanical valved conduit and remote chest trauma was referred to our institution with prosthetic endocarditis. Transoesophageal echocardiogram at our institution confirmed a near-complete dehiscence of the prosthetic aortic valve from the conduit, with significant perivalvular flow forming a pseudoaneurysm. The patient underwent a high-risk re-operation, involving redo aortic root replacement with a homograft after extensive debridement of the infected tissue. The patient was discharged to an outside facility after an uncomplicated hospital course, and remains stable. PMID:24510692

  5. A rare case of prosthetic endocarditis and dehiscence in a mechanical valved conduit.

    PubMed

    Kannan, Arun; Smith, Cristy; Subramanian, Sreekumar; Janardhanan, Rajesh

    2014-02-07

    A middle-aged adult patient with a history of aortic root replacement with a mechanical valved conduit and remote chest trauma was referred to our institution with prosthetic endocarditis. Transoesophageal echocardiogram at our institution confirmed a near-complete dehiscence of the prosthetic aortic valve from the conduit, with significant perivalvular flow forming a pseudoaneurysm. The patient underwent a high-risk re-operation, involving redo aortic root replacement with a homograft after extensive debridement of the infected tissue. The patient was discharged to an outside facility after an uncomplicated hospital course, and remains stable.

  6. Strength and durability studies on concrete with partial replacement over burnt brick bat waste

    NASA Astrophysics Data System (ADS)

    Kanchidurai, S.; Bharani, G.; Saravana Raja Mohan, K.

    2017-07-01

    This paper presents the partial and complete replacement of over burnt brick bat (OBB) 20-30mm as coarse aggregate in the concrete. OBB are formed at extreme heating to a temperature not less than 1600 degree Celsius. The burnt bricks change from red to blue-black ceramics color. The series of tests are conducted to study the effect of 0%, 25%, 50%, 75% and 100% replacement of coarse aggregate with over burnt bricks. Totally 36numbers of 150mm concrete cube with 5 different percentage replacement mix are cast and tested and three numbers of the flexural beam. In durability aspects, water absorption and sorptivity were tested. Experimental results found 25-50% of overburnt brick bat wastes can be replaced with the normal and mass concrete without quality compromisation.

  7. KSC-98pc786

    NASA Image and Video Library

    1998-07-06

    James W. Tibble (pointing at engine), an Engine Systems/Ground Support Equipment team manager for Rocketdyne, discusses the operation of a Space Shuttle Main Engine with Robert B. Sieck, director of Shuttle Processing; U.S. Congressman Dave Weldon; and KSC Center Director Roy D. Bridges Jr. Following the ribbon cutting ceremony for KSC's new 34,600-square-foot Space Shuttle Main Engine Processing Facility (SSMEPF), KSC employees and media explored the facility. A major addition to the existing Orbiter Processing Facility Bay 3, the SSMEPF replaces the Shuttle Main Engine Shop located in the Vehicle Assembly Building (VAB). The decision to move the shop out of the VAB was prompted by safety considerations and recent engine processing improvements. The first three main engines to be processed in the new facility will fly on Shuttle Endeavour's STS-88 mission in December 1998

  8. Radiation shielding design of a new tomotherapy facility.

    PubMed

    Zacarias, Albert; Balog, John; Mills, Michael

    2006-10-01

    It is expected that intensity modulated radiation therapy (IMRT) and image guided radiation therapy (IGRT) will replace a large portion of radiation therapy treatments currently performed with conventional MLC-based 3D conformal techniques. IGRT may become the standard of treatment in the future for prostate and head and neck cancer. Many established facilities may convert existing vaults to perform this treatment method using new or upgraded equipment. In the future, more facilities undoubtedly will be considering de novo designs for their treatment vaults. A reevaluation of the design principles used in conventional vault design is of benefit to those considering this approach with a new tomotherapy facility. This is made more imperative as the design of the TomoTherapy system is unique in several aspects and does not fit well into the formalism of NCRP 49 for a conventional linear accelerator.

  9. The SSMEPF opens with a ribbon-cutting ceremony

    NASA Technical Reports Server (NTRS)

    1998-01-01

    James W. Tibble (pointing at engine), an Engine Systems/Ground Support Equipment team manager for Rocketdyne, discusses the operation of a Space Shuttle Main Engine with Robert B. Sieck, director of Shuttle Processing; U.S. Congressman Dave Weldon; and KSC Center Director Roy D. Bridges Jr. Following the ribbon cutting ceremony for KSC's new 34,600-square-foot Space Shuttle Main Engine Processing Facility (SSMEPF), KSC employees and media explored the facility. A major addition to the existing Orbiter Processing Facility Bay 3, the SSMEPF replaces the Shuttle Main Engine Shop located in the Vehicle Assembly Building (VAB). The decision to move the shop out of the VAB was prompted by safety considerations and recent engine processing improvements. The first three main engines to be processed in the new facility will fly on Shuttle Endeavour's STS-88 mission in December 1998.

  10. P-23 Highlights 6/10/12: Cygnus Dual Beam Radiographic Facility Refurbishment completed at U1A tunnel in Nevada NNSS meeting Level 2 milestone

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Deyoung, Anemarie; Smith, John R.

    2012-05-03

    A moratorium was placed on U.S. underground nuclear testing in 1992. In response, the Stockpile Stewardship Program was created to maintain readiness of the existing nuclear inventory through several efforts such as computer modeling, material analysis, and subcritical nuclear experiments (SCEs). As in the underground test era, the Nevada National Security Site (NNSS), formerly the Nevada Test Site, provides a safe and secure environment for SCEs by the nature of its isolated and secure facilities. A major tool for SCE diagnosis installed in the 05 drift laboratory is a high energy x-ray source used for time resolved imaging. This toolmore » consists of two identical sources (Cygnus 1 and Cygnus 2) and is called the Cygnus Dual Beam Radiographic Facility (Figs. 2-6). Each Cygnus machine has 5 major elements: Marx Generator, Pulse Forming Line (PFL), Coaxial Transmission Line (CTL), 3-cell Inductive Voltage Adder (IVA), and Rod Pinch Diode. Each machine is independently triggered and may be fired in separate tests (staggered mode), or in a single test where there is submicrosecond separation between the pulses (dual mode). Cygnus must operate as a single shot machine since on each pulse the diode electrodes are destroyed. The diode is vented to atmosphere, cleaned, and new electrodes are inserted for each shot. There is normally two shots per day on each machine. Since its installation in 2003, Cygnus has participated in: 4 Subcritical Experiments (Armando, Bacchus, Barolo A, and Barolo B), a 12 shot plutonium physics series (Thermos), and 2 plutonium step wedge calibration series (2005, 2011), resulting in well over 1000 shots. Currently the Facility is in preparation for 2 SCEs scheduled for this calendar year - Castor and Pollux. Cygnus has performed well during 8 years of operations at NNSS. Many improvements in operations and performance have been implemented during this time. Throughout its service at U1a, major maintenance and replacement of many hardware items were delayed due to programmatic requirements. It is anticipated that Cygnus will be in service at U1a for another 5 years. With this assumption, it was realized that significant resources and effort should be allotted to bring the hardware back to its original condition, or even to improve elements when appropriate. The Cygnus Refurbishment and Enhancement Project started in April, 2011 with the intent to encompass a major overhaul of Cygnus.« less

  11. Proton irradiation damage of an annealed Alloy 718 beam window

    DOE PAGES

    Bach, H. T.; Anderoglu, O.; Saleh, T. A.; ...

    2015-04-01

    Mechanical testing and microstructural analysis was performed on an Alloy 718 window that was in use at the Los Alamos Neutron Science Center (LANSCE) Isotope Production Facility (IPF) for approximately 5 years. It was replaced as part of the IPF preventive maintenance program. The window was transported to the Wing 9 hot cells at the Chemical and Metallurgical Research (CMR) LANL facility, visually inspected and 3-mm diameter samples were trepanned from the window for mechanical testing and microstructural analysis. Shear punch testing and optical metallography was performed at the CMR hot cells. The 1-mm diameter shear punch disks were cutmore » into smaller samples to further reduce radiation exposure dose rate using Focus Ion Beam (FIB) and microstructure changes were analyzed using a Transmission Electron Microscopy (TEM). Irradiation doses were determined to be ~0.2–0.7 dpa (edge) to 11.3 dpa (peak of beam intensity) using autoradiography and MCNPX calculations. The corresponding irradiation temperatures were calculated to be ~34–120 °C with short excursion to be ~47–220 °C using ANSYS. Mechanical properties and microstructure analysis results with respect to calculated dpa and temperatures show that significant work hardening occurs but useful ductility still remains. The hardening in the lowest dose region (~0.2–0.7 dpa) was the highest and attributed to the formation of γ" precipitates and irradiation defect clusters/bubbles whereas the hardening in the highest dose region (~11.3 dpa) was lower and attributed mainly to irradiation defect clusters and some thermal annealing.« less

  12. Colleges Replace Drab Gyms with Sleek, Playful Facilities.

    ERIC Educational Resources Information Center

    Reisberg, Leo

    2001-01-01

    Colleges are building luxurious wellness, fitness, and recreation centers in part to attract and retain students. They offer such features as rock-climbing walls, water slides, hot tubs, elevated tracks, massage rooms, racquetball courts, and wellness resource laboratories. Many college officials believe that investments in recreation are…

  13. Think green.

    PubMed

    Serb, Chris

    2008-08-01

    Hospitals typically don't come to mind when you think about cutting-edge environmental programs, but that's changing. Rising energy costs, the need to replace older facilities, and a growing environmental consciousness have spurred hospitals nationwide to embrace a green ideology. The executive suite is a vocal and active player in these efforts.

  14. Novel Polyfluorinated Compounds Identified Using High Resolution Mass Spectrometry Downstream of Manufacturing Facilities near Decatur, Alabama

    EPA Science Inventory

    Concern over persistence, bioaccumulation, and toxicity has led to international regulation and phase-outs of certain perfluorinated compounds and little is known about their replacement products. High resolution mass spectrometry was used to investigate the occurrence and identi...

  15. Performance and function of a high-speed multiple star topology image management system at Mayo Clinic Scottsdale.

    PubMed

    Pavlicek, W; Zavalkovskiy, B; Eversman, W G

    1999-05-01

    Mayo Clinic Scottsdale (MCS) is a busy outpatient facility (150,000 examinations per year) connected via asynchronous transfer mode (ATM; OC-3 155 MB/s) to a new Mayo Clinic Hospital (178 beds) located more than 12 miles distant. A primary care facility staffed by radiology lies roughly halfway between the hospital and clinic connected to both. Installed at each of the three locations is a high-speed star topology image network providing direct fiber connection (160 MB/s) from the local image storage unit (ISU) to the local radiology and clinical workstations. The clinic has 22 workstations in its star, the hospital has 13, and the primary care practice has two. In response to Mayo's request for a seamless service among the three locations, the vendor (GE Medical Systems, Milwaukee, WI) provided enhanced connectivity capability in a two-step process. First, a transfer gateway (TGW) was installed, tested, and implemented to provide the needed communication of the examinations generated at the three sites. Any examinations generated at either the hospital or the primary care facility (specified as the remote stars) automatically transfer their images to the ISU at the clinic. Permanent storage (Kodak optical jukebox, Rochester, NY) is only connected to the hub (Clinic) star. Thus, the hub ISU is provided with a copy of all examinations, while the two remote ISUs maintain local exams. Prefetching from the archive is intelligently accomplished during the off hours only to the hub star, thus providing the remote stars with network dependent access to comparison images. Image transfer is possible via remote log-on. The second step was the installation of an image transfer server (ITS) to replace the slower Digital Imaging and Communications in Medicine (DICOM)-based TGW, and a central higher performance database to replace the multiple database environment. This topology provides an enterprise view of the images at the three locations, while maintaining the high-speed performance of the local star connection to what is now called the short-term storage (STS). Performance was measured and 25 chest examinations (17 MB each) transferred in just over 4 minutes. Integration of the radiology information management system (RIMS) was modified to provide location-specific report and examination interfaces, thereby allowing local filtering of the worklist to remote and near real-time consultation, and remote examination monitoring of modalities are addressed with this technologic approach. The installation of the single database ITS environment has occurred for testing prior to implementation.

  16. KSC-2009-2517

    NASA Image and Video Library

    2009-04-02

    CAPE CANAVERAL, Fla. – In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center in Florida, a technician prepares the Science Instrument Command and Data Handling Unit, or SIC&DH, for its move to the Multi-Use Lightweight Equipment Carrier in the facility. The SIC&DH will be installed on the Hubble Space Telescope during space shuttle Atlantis' STS-125 mission. This unit will replace the one that suffered a failure aboard the orbiting telescope on Sept. 27, 2008. Atlantis is targeted for launch on May 12. Photo credit: NASA/Dimitri Gerondidakis

  17. KSC-2009-2516

    NASA Image and Video Library

    2009-04-02

    CAPE CANAVERAL, Fla. – In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center in Florida, technicians look over the Science Instrument Command and Data Handling Unit, or SIC&DH. The SIC&DH will be installed on the Multi-Use Lightweight Equipment Carrier in the facility. The SIC&DH will be installed on the Hubble Space Telescope during space shuttle Atlantis' STS-125 mission. This unit will replace the one that suffered a failure aboard the orbiting telescope on Sept. 27, 2008. Atlantis is targeted for launch on May 12. Photo credit: NASA/Dimitri Gerondidakis

  18. KSC-04pd0588

    NASA Image and Video Library

    2004-03-18

    KENNEDY SPACE CENTER, FLA. - A Universal Coolant Transporter (UCT), manufactured in Sharpes, Fla., passes the Astronaut Hall of Fame on its way to Kennedy Space Center. Replacing the existing ground cooling unit, the UCT is designed to service payloads for the Space Shuttle and International Space Station, and may be capable of servicing space exploration vehicles of the future. It will provide ground cooling to the orbiter and returning payloads, such as science experiments requiring cold or freezing temperatures, during post-landing activities at the Shuttle Landing Facility and during transport of the payloads to other facilities.

  19. KSC-04pd0592

    NASA Image and Video Library

    2004-03-18

    KENNEDY SPACE CENTER, FLA. - A Universal Coolant Transporter (UCT), manufactured in Sharpes, Fla., arrives at the hangar at the KSC Shuttle Landing Facility (SLF). Replacing the existing ground cooling unit, the UCT is designed to service payloads for the Space Shuttle and International Space Station, and may be capable of servicing space exploration vehicles of the future. It will provide ground cooling to the orbiter and returning payloads, such as science experiments requiring cold or freezing temperatures, during post-landing activities at the SLF and during transport of the payloads to other facilities.

  20. Imam Sahib Border Police Company Headquarters in Kunduz Province: $7.3 Million Facility Sits Largely Unused

    DTIC Science & Technology

    2013-01-01

    Afghanistan Border Police Battalion (BN) Headquarters (HQ) to replace an existing sub-standard fac ility. The standard ABP BN HQ manning documents call for...current manning of the site revealed that an ABP BN HQ unit is now utilizing this as a headquarters. An ABP BN HQ has a tashkil manning of 59 personnel...The facility was built for 175 personnel. The difference in designs between an ABP battalion and a company is the amount of barrack space. The build

  1. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stovall, J.P.; RIzy, D.T.; Kisner, R.A.

    The 3M Company has developed a high-temperature low-sag conductor referred to as Aluminum- Conductor Composite-Reinforced or ACCR. The conductor uses an aluminum metal matrix material to replace the steel in conventional conductors so the core has a lower density and higher conductivity. The objective of this work is to accelerate the commercial acceptance by electric utilities of these new conductor designs by testing four representative conductor classes in controlled conditions. Overhead transmission lines use bare aluminum conductor strands wrapped around a steel core strands to transmit electricity. The typical cable is referred to as aluminum-conductor steel-reinforced (ACSR). The outer strandsmore » are aluminum, chosen for its conductivity, low weight, and low cost. The center strand is of steel for the strength required to support the weight without stretching the aluminum due to its ductility. The power density of a transmission corridor has been directly increased by increasing the voltage level. Transmission voltages have increased from 115-kV to 765- kV over the past 80 years. In the United States, further increasing the voltage level is not feasible at this point in time, so in order to further increase the power density of a transmission corridor, conductor designs that increase the current carrying capability have been examined. One of the key limiting factors in the design of a transmission line is the conductor sag which determines the clearance of the conductor above ground or underlying structures needed for electrical safety. Increasing the current carrying capability of a conductor increases the joule heating in the conductor which increases the conductor sag. A conductor designed for high-temperature and lowsag operation requires an engineered modification of the conductor materials. To make an advanced cable, the 3M Company solution has been the development of a composite conductor consisting of Nextel ceramic fibers to replace the steel core and an aluminum-zirconium alloy to improve the outer strands. The result is a cable that can carry more current than steelaluminum lines without sagging as much at higher temperatures. A unique facility called the Powerline Conductor Accelerated Testing (PCAT) Facility was built at ORNL for testing overhead conductors. The PCAT has been uniquely designed for testing overhead bare transmission line conductors at high currents and temperatures after they have been installed and tensioned to the manufacturer's specifications. The ability to operate a transmission line conductor in this manner does not exist elsewhere in the United States. Four classes of ACCR cable designed by 3M have been successfully test at ORNL – small, medium, large and small/compact. Based on these and other manufacturer tests, the 3M Company has successfully introduced the ACCR into the commercial market and has completed over twenty installations for utility companies.« less

  2. Reducing animal experimentation in foot-and-mouth disease vaccine potency tests.

    PubMed

    Reeve, Richard; Cox, Sarah; Smitsaart, Eliana; Beascoechea, Claudia Perez; Haas, Bernd; Maradei, Eduardo; Haydon, Daniel T; Barnett, Paul

    2011-07-26

    The World Organisation for Animal Health (OIE) Terrestrial Manual and the European Pharmacopoeia (EP) still prescribe live challenge experiments for foot-and-mouth disease virus (FMDV) immunogenicity and vaccine potency tests. However, the EP allows for other validated tests for the latter, and specifically in vitro tests if a "satisfactory pass level" has been determined; serological replacements are also currently in use in South America. Much research has therefore focused on validating both ex vivo and in vitro tests to replace live challenge. However, insufficient attention has been given to the sensitivity and specificity of the "gold standard"in vivo test being replaced, despite this information being critical to determining what should be required of its replacement. This paper aims to redress this imbalance by examining the current live challenge tests and their associated statistics and determining the confidence that we can have in them, thereby setting a standard for candidate replacements. It determines that the statistics associated with the current EP PD(50) test are inappropriate given our domain knowledge, but that the OIE test statistics are satisfactory. However, it has also identified a new set of live animal challenge test regimes that provide similar sensitivity and specificity to all of the currently used OIE tests using fewer animals (16 including controls), and can also provide further savings in live animal experiments in exchange for small reductions in sensitivity and specificity. Copyright © 2011 Elsevier Ltd. All rights reserved.

  3. Re-Engineering the ISS Payload Operations Control Center During Increased Utilization and Critical Onboard Events

    NASA Technical Reports Server (NTRS)

    Dudley, Stephanie R. B.; Marsh, Angela L.

    2014-01-01

    With an increase in utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four-month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS real-time operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art Video Wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project. This paper describes the logistics and lessons learned in upgrading a control center capability in the middle of complex real-time operations. Combining the efficiencies of controller interaction and new technology infusion were prime drivers for this upgrade to handle the increased utilization of science research on ISS. The success of this project could not jeopardize the current operations while these facility upgrades occurred.

  4. Testing of Streckeisen STS-5A and Nanometrics Trillium 120PH Sensors for the Alaska Transportable Array

    NASA Astrophysics Data System (ADS)

    Abbasi Baghbadorani, A.; Aderhold, K.; Bloomquist, D.; Frassetto, A.; Miller, P. E.; Busby, R. W.

    2017-12-01

    Starting in 2014, the IRIS Transportable Array facility began to install and operate seismic stations in Alaska and western Canada. By the end of the project, the full deployment of the array will cover a grid of 280 stations spaced about 85 km apart covering all of mainland Alaska and parts of the Yukon, British Columbia, and the Northwest Territories. Approximately 200 stations will be operated directly by IRIS through at least 2019. A key aspect of the Alaska TA is the need for stations to operate autonomously, on account of the high cost of installation and potential subsequent visits to remote field-sites to repair equipment. The TA is using newly developed broadband seismometers Streckeisen STS-5A and Nanometrics Trillium-120PH, designed for installation in shallow posthole emplacements. These new instruments were extensively vetted beforehand, but they are still relatively new to the TA inventory. Here we will assess their performance under deployment conditions and after repeated commercial shipping and travel to the field. Our objective is to provide a thorough accounting of the identified failures of the existing inventory of posthole instruments. We will assess the practices and results of instrument testing by the PASSCAL Instrument Center/Array Operations Facility (PIC/AOF), Alaska Operations Center (AOC), and broadband seismic sensor manufacturers (Streckeisen, Nanometrics) in order to document potential factors in and stages during the process for instrument failures. This will help to quantify the overall reliability of the TA seismic sensors and quality of TA practices and data collection, and identify potential considerations in future TA operations. Our results show that the overall rate of failure of all posthole instruments is <4% out of 260. This is lower than the rates seen for vault sensor failures in the operation of the Lower 48 Transportable Array. For telemetered stations such as these installed in the TA Alaska array, we also show that noise analyses can capture a failed emplaced sensor and reveal improved station performance after sensor replacement, and that these are key elements in assessing whether or not a sensor should be replaced in the field.

  5. Electromagnetic Interference/Compatibility (EMI/EMC) Control Test and Measurement Facility: User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    Scully, Robert C.

    2011-01-01

    Test process, milestones and inputs are unknowns to first-time users of the EMI/EMC Test Facility. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  6. 46 CFR 54.05-1 - Scope (replaces UG-84).

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 2 2014-10-01 2014-10-01 false Scope (replaces UG-84). 54.05-1 Section 54.05-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PRESSURE VESSELS Toughness Tests § 54.05-1 Scope (replaces UG-84). The toughness tests of materials used in pressure vessels shall be as required by this subpart in lieu of...

  7. 46 CFR 54.05-1 - Scope (replaces UG-84).

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 2 2012-10-01 2012-10-01 false Scope (replaces UG-84). 54.05-1 Section 54.05-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PRESSURE VESSELS Toughness Tests § 54.05-1 Scope (replaces UG-84). The toughness tests of materials used in pressure vessels shall be as required by this subpart in lieu of...

  8. 46 CFR 54.05-1 - Scope (replaces UG-84).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 2 2010-10-01 2010-10-01 false Scope (replaces UG-84). 54.05-1 Section 54.05-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PRESSURE VESSELS Toughness Tests § 54.05-1 Scope (replaces UG-84). The toughness tests of materials used in pressure vessels shall be as required by this subpart in lieu of...

  9. 46 CFR 54.05-1 - Scope (replaces UG-84).

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 2 2011-10-01 2011-10-01 false Scope (replaces UG-84). 54.05-1 Section 54.05-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PRESSURE VESSELS Toughness Tests § 54.05-1 Scope (replaces UG-84). The toughness tests of materials used in pressure vessels shall be as required by this subpart in lieu of...

  10. 46 CFR 54.05-1 - Scope (replaces UG-84).

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 2 2013-10-01 2013-10-01 false Scope (replaces UG-84). 54.05-1 Section 54.05-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PRESSURE VESSELS Toughness Tests § 54.05-1 Scope (replaces UG-84). The toughness tests of materials used in pressure vessels shall be as required by this subpart in lieu of...

  11. Thermal Characterization of Adhesive

    NASA Technical Reports Server (NTRS)

    Spomer, Ken A.

    1999-01-01

    The current Space Shuttle Reusable Solid Rocket Motor (RSRM) nozzle adhesive bond system is being replaced due to obsolescence. Down-selection and performance testing of the structural adhesives resulted in the selection of two candidate replacement adhesives, Resin Technology Group's Tiga 321 and 3M's EC2615XLW. This paper describes rocket motor testing of these two adhesives. Four forty-pound charge motors were fabricated in configurations that would allow side by side comparison testing of the candidate replacement adhesives and the current RSRM adhesives. The motors provided an environment where the thermal performance of adhesives in flame surface bondlines was compared. Results of the FPC testing show that: 1) The phenolic char depths on radial bond lines is approximately the same and vary depending on the position in the blast tube regardless of which adhesive was used; 2) The adhesive char depth of the candidate replacement adhesives is less than the char depth of the current adhesives; 3) The heat-affected depth of the candidate replacement adhesives is less than the heat-affected depth of the current adhesives; and 4) The ablation rates for both replacement adhesives are slower than that of the current adhesives.

  12. FY13 GLYCOLIC-NITRIC ACID FLOWSHEET DEMONSTRATIONS OF THE DWPF CHEMICAL PROCESS CELL WITH SIMULANTS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lambert, D.; Zamecnik, J.; Best, D.

    Savannah River Remediation is evaluating changes to its current Defense Waste Processing Facility flowsheet to replace formic acid with glycolic acid in order to improve processing cycle times and decrease by approximately 100x the production of hydrogen, a potentially flammable gas. Higher throughput is needed in the Chemical Processing Cell since the installation of the bubblers into the melter has increased melt rate. Due to the significant maintenance required for the safety significant gas chromatographs and the potential for production of flammable quantities of hydrogen, eliminating the use of formic acid is highly desirable. Previous testing at the Savannah Rivermore » National Laboratory has shown that replacing formic acid with glycolic acid allows the reduction and removal of mercury without significant catalytic hydrogen generation. Five back-to-back Sludge Receipt and Adjustment Tank (SRAT) cycles and four back-to-back Slurry Mix Evaporator (SME) cycles were successful in demonstrating the viability of the nitric/glycolic acid flowsheet. The testing was completed in FY13 to determine the impact of process heels (approximately 25% of the material is left behind after transfers). In addition, back-to-back experiments might identify longer-term processing problems. The testing was designed to be prototypic by including sludge simulant, Actinide Removal Product simulant, nitric acid, glycolic acid, and Strip Effluent simulant containing Next Generation Solvent in the SRAT processing and SRAT product simulant, decontamination frit slurry, and process frit slurry in the SME processing. A heel was produced in the first cycle and each subsequent cycle utilized the remaining heel from the previous cycle. Lower SRAT purges were utilized due to the low hydrogen generation. Design basis addition rates and boilup rates were used so the processing time was shorter than current processing rates.« less

  13. Overview of the Orion Vibroacoustic Test Capability at NASA Glenn Research Center

    NASA Technical Reports Server (NTRS)

    Hughes, William O.; Hozman, Aron D.; McNelis, Mark E.; Otten, Kim D.

    2008-01-01

    In order to support the environmental test needs for our new Orion and Constellation program, NASA is developing unique world-class test facilities. To optimize this testing of spaceflight hardware while minimizing transportation issues, a one-stop, under one roof test capability is being developed at the Space Power Facility at the NASA Glenn Research Center's Plum Brook Station. This facility will provide the capability to perform the following environmental testing: (1) reverberation acoustic testing, (2) mechanical base-shake sine testing, (3) modal testing, (4) thermal-vacuum testing, and (5) EMI/EMC (electromagnetic interference and compatibility) testing. An overview of this test capability will be provided in this presentation, with special focus on the two new vibroacoustic test facilities currently being designed and built, the Reverberant Acoustic Test Facility (RATF) and the Mechanical Vibration Facility (MVF). Testing of the engineering developmental hardware and qualification hardware of the Orion (Crew Exploration Vehicle) will commence shortly after the facilities are commissioned.

  14. Environmental projects. Volume 2: Underground storage tanks compliance program

    NASA Technical Reports Server (NTRS)

    Kushner, L.

    1987-01-01

    Six large parabolic dish antennas are located at the Goldstone Deep Space Communications Complex north of Barstow, California. As a large-scale facility located in a remote, isolated desert region, the GDSCC operations require numerous on-site storage facilities for gasoline, diesel and hydraulic oil. These essential fluids are stored in underground storage tanks (USTs). Because USTs may develop leaks with the resultant seepage of their hazardous contents into the surrounding soil, local, State and Federal authorities have adopted stringent regulations for the testing and maintenance of USTs. Under the supervision of JPL's Office of Telecommunications and Data Acquisition, a year-long program has brought 27 USTs at the Goldstone Complex into compliance with Federal, State of California and County of San Bernadino regulations. Of these 27 USTs, 15 are operating today, 11 have been temporary closed down, and 1 abandoned in place. In 1989, the 15 USTs now operating at the Goldstone DSCC will be replaced either by modern, double-walled USTs equipped with automatic sensors for leak detection, or by above ground storage tanks. The 11 inactivated USTs are to be excavated, removed and disposed of according to regulation.

  15. ReplacementMatrix: a web server for maximum-likelihood estimation of amino acid replacement rate matrices.

    PubMed

    Dang, Cuong Cao; Lefort, Vincent; Le, Vinh Sy; Le, Quang Si; Gascuel, Olivier

    2011-10-01

    Amino acid replacement rate matrices are an essential basis of protein studies (e.g. in phylogenetics and alignment). A number of general purpose matrices have been proposed (e.g. JTT, WAG, LG) since the seminal work of Margaret Dayhoff and co-workers. However, it has been shown that matrices specific to certain protein groups (e.g. mitochondrial) or life domains (e.g. viruses) differ significantly from general average matrices, and thus perform better when applied to the data to which they are dedicated. This Web server implements the maximum-likelihood estimation procedure that was used to estimate LG, and provides a number of tools and facilities. Users upload a set of multiple protein alignments from their domain of interest and receive the resulting matrix by email, along with statistics and comparisons with other matrices. A non-parametric bootstrap is performed optionally to assess the variability of replacement rate estimates. Maximum-likelihood trees, inferred using the estimated rate matrix, are also computed optionally for each input alignment. Finely tuned procedures and up-to-date ML software (PhyML 3.0, XRATE) are combined to perform all these heavy calculations on our clusters. http://www.atgc-montpellier.fr/ReplacementMatrix/ olivier.gascuel@lirmm.fr Supplementary data are available at http://www.atgc-montpellier.fr/ReplacementMatrix/

  16. Survey of solar thermal test facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Masterson, K.

    The facilities that are presently available for testing solar thermal energy collection and conversion systems are briefly described. Facilities that are known to meet ASHRAE standard 93-77 for testing flat-plate collectors are listed. The DOE programs and test needs for distributed concentrating collectors are identified. Existing and planned facilities that meet these needs are described and continued support for most of them is recommended. The needs and facilities that are suitable for testing components of central receiver systems, several of which are located overseas, are identified. The central contact point for obtaining additional details and test procedures for these facilitiesmore » is the Solar Thermal Test Facilities Users' Association in Albuquerque, N.M. The appendices contain data sheets and tables which give additional details on the technical capabilities of each facility. Also included is the 1975 Aerospace Corporation report on test facilities that is frequently referenced in the present work.« less

  17. Efficacy of Cleaning and Disinfection Procedures in a Zebrafish (Danio rerio) Facility

    PubMed Central

    Garcia, Rachel L; Sanders, George E

    2011-01-01

    Appropriate cleaning and disinfection procedures in zebrafish (Danio rerio) laboratories are crucial in preventing the spread of aquatic animal pathogens and minimizing the build-up of waste products and biologic matter. The procedures selected should accomplish these goals and incorporate the individual needs of various laboratories. In this study of a single zebrafish facility, we assessed the efficacy of 2 different cleaning and disinfection procedures for nets, tanks, and lids. ATP levels were used as a surrogate biomarker for microbial burden. We measured the number of relative light units (RLU), as an expression of the amount of ATP present, on items before and after disinfection and calculated the percentage reduction. We compared daily replacement of a commercial net disinfection product in J lab with weekly replacement in H lab and found a 96.6% reduction in RLU in H lab and a 91.2% reduction in J lab. These results indicate that either replacement schedule is effective. Evaluation of tanks and lids soaked in a bleach disinfection bath for 30 or 60 min revealed a 99.7% reduction in RLU at 30 min compared with 97.1% at 60 min. Therefore a 30-min soak in a bleach bath achieved a similar level of disinfection as did a 60-min soak. The current results demonstrate that these cleaning and disinfection methods are efficacious. PMID:22330783

  18. Efficacy of cleaning and disinfection procedures in a zebrafish (Danio rerio) facility.

    PubMed

    Garcia, Rachel L; Sanders, George E

    2011-11-01

    Appropriate cleaning and disinfection procedures in zebrafish (Danio rerio) laboratories are crucial in preventing the spread of aquatic animal pathogens and minimizing the build-up of waste products and biologic matter. The procedures selected should accomplish these goals and incorporate the individual needs of various laboratories. In this study of a single zebrafish facility, we assessed the efficacy of 2 different cleaning and disinfection procedures for nets, tanks, and lids. ATP levels were used as a surrogate biomarker for microbial burden. We measured the number of relative light units (RLU), as an expression of the amount of ATP present, on items before and after disinfection and calculated the percentage reduction. We compared daily replacement of a commercial net disinfection product in J lab with weekly replacement in H lab and found a 96.6% reduction in RLU in H lab and a 91.2% reduction in J lab. These results indicate that either replacement schedule is effective. Evaluation of tanks and lids soaked in a bleach disinfection bath for 30 or 60 min revealed a 99.7% reduction in RLU at 30 min compared with 97.1% at 60 min. Therefore a 30-min soak in a bleach bath achieved a similar level of disinfection as did a 60-min soak. The current results demonstrate that these cleaning and disinfection methods are efficacious.

  19. Reducing Organic Contamination in NASA JSC Astromaterial Curation Facility

    NASA Technical Reports Server (NTRS)

    Calaway, M. J.; Allen, C. C.; Allton, J. H.

    2013-01-01

    Future robotic and human spaceflight missions to the Moon, Mars, asteroids and comets will require handling and storing astromaterial samples with minimal inorganic and organic contamination to preserve the scientific integrity of each sample. Much was learned from the rigorous attempts to minimize and monitor organic contamination during Apollo, but it was not adequate for current analytical requirements; thus [1]. OSIRIS-REx, Hayabusa-2, and future Mars sample return will require better protocols for reducing organic contamination. Future isolation con-tainment systems for astromaterials, possibly nitrogen enriched gloveboxes, must be able to reduce organic and inorganic cross-contamination. In 2012, a baseline study established the current state of organic cleanliness in gloveboxes used by NASA JSC astromaterials curation labs that could be used as a benchmark for future mission designs [2, 3]. After standard ultra-pure water (UPW) cleaning, the majority of organic contaminates found were hydrocarbons, plasticizers, silicones, and solvents. Hydro-carbons loads (> C7) ranged from 1.9 to 11.8 ng/cm2 for TD-GC-MS wafer exposure analyses and 5.0 to 19.5 ng/L for TD-GC-MS adsorbent tube exposure. Plasticizers included < 0.6 ng/cm2 of DBP, DEP, TXIB, and DIBP. Silicones included < 0.5 ng/cm2 of cyclo(Me2SiO)x (x = 6, 8, 9, 10) and siloxane. Solvents included < 1.0 ng/cm2 of 2-cyclohexen-1-one, 3,5,5-trimethyl- (Isopho-rone), N-formylpiperidine, and 2-(2-butoxyethoxy) ethanol. In addition, DBF, rubber/polymer additive was found at < 0.2 ng/cm2 and caprolactam, nylon-6 at < 0.6 ng/cm2. Reducing Organics: The Apollo program was the last sam-ple return mission to place high-level organic requirements and biological containment protocols on a curation facility. The high vacuum complex F-201 glovebox in the Lunar Receiving Labora-tory used ethyl alcohol (190 proof), 3:1 benzene/methanol (nano grade solution), and heat sterilization at 130degC for 48 hours to reduce organic contamination. In addition, both heat sterilization and peracetic acid sterilization were used in the atmospheric de-contamination (R) cabinets. Later, Lunar curation gloveboxes were degreased with a pressurized Freon 113 wash. Today, UPW has replaced Freon as the standard cleaning procedure, but does not have the degreasing solvency power of Freon. Future Cleaning Studies: Cleaning experiments are cur-rently being orchestrated to study how to degrease and reduce organics in a JSC curation glovebox lower than the established baseline. Several new chemicals in the industry have replaced traditional degreasing solvents such as Freon and others that are now federally restricted. However, these new suites of chemicals remain untested for lowering organics in curation gloveboxes. 3M's HFE-7100DL and DuPont's Vertrel XF are currently being tested as a replacement for Freon 113 as a degreaser at JSC cura-tion facilities. In addition, the use of UPW as a final rinse is be-ing tested, which presumably can maintain a lower total organic carbon load than the filtered purity of chemical solutions. References: [1] Allton J.H. et al. (2012) LPS XLIII, 2439; [2] Calaway M.

  20. 23 CFR 668.209 - Eligibility of work.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... RELIEF PROGRAM Procedures for Federal Agencies for Federal Roads § 668.209 Eligibility of work. (a... paragraph (a) of § 668.215. (c) To qualify for emergency relief, the damaged or destroyed road or trail shall be designated as a Federal road. (d) Replacement highway facilities are appropriate when it is not...

Top