NASA Technical Reports Server (NTRS)
Ahuja, Vineet; Hosangadi, Ashvin; Allgood, Daniel
2008-01-01
Simulation technology can play an important role in rocket engine test facility design and development by assessing risks, providing analysis of dynamic pressure and thermal loads, identifying failure modes and predicting anomalous behavior of critical systems. This is especially true for facilities such as the proposed A-3 facility at NASA SSC because of a challenging operating envelope linked to variable throttle conditions at relatively low chamber pressures. Design Support of the feasibility of operating conditions and procedures is critical in such cases due to the possibility of startup/shutdown transients, moving shock structures, unsteady shock-boundary layer interactions and engine and diffuser unstart modes that can result in catastrophic failure. Analyses of such systems is difficult due to resolution requirements needed to accurately capture moving shock structures, shock-boundary layer interactions, two-phase flow regimes and engine unstart modes. In a companion paper, we will demonstrate with the use of CFD, steady analyses advanced capability to evaluate supersonic diffuser and steam ejector performance in the sub-scale A-3 facility. In this paper we will address transient issues with the operation of the facility especially at startup and shutdown, and assess risks related to afterburning due to the interaction of a fuel rich plume with oxygen that is a by-product of the steam ejectors. The primary areas that will be addressed in this paper are: (1) analyses of unstart modes due to flow transients especially during startup/ignition, (2) engine safety during the shutdown process (3) interaction of steam ejectors with the primary plume i.e. flow transients as well as probability of afterburning. In this abstract we discuss unsteady analyses of the engine shutdown process. However, the final paper will include analyses of a staged startup, drawdown of the engine test cell pressure, and risk assessment of potential afterburning in the facility. Unsteady simulations have been carried out to study the engine shutdown process in the facility and understand the physics behind the interactions between the steam ejectors, the test cell and the supersonic diffuser. As a first approximation, to understand the dominant unsteady mechanisms in the engine test cell and the supersonic diffuser, the turning duct in the facility was removed. As the engine loses power a rarefaction wave travels downstream that disrupts the shock cell structure in the supersonic diffuser. Flow from the test cell is seen to expand into the supersonic diffuser section and re-pressurizes the area around the nozzle along with a upstream traveling compression wave that emanates from near the first stage ejectors. Flow from the first stage ejector expands to the center of the duct and a new shock train is formed between the first and second stage ejectors. Both stage ejectors keep the facility pressurized and prevent any large amplitude pressure fluctuations from affecting the engine nozzle. The resultant pressure loads the nozzle experiences in the shutdown process are small.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Villanueva, J. F.; Carlos, S.; Martorell, S.
The loss of the residual heat removal system in mid-loop conditions may occur with a non-negligible contribution to the plant risk, so the analysis of the accidental sequences and the actions to mitigate the accident are of great interest in shutdown conditions. In order to plan the appropriate measures to mitigate the accident is necessary to understand the thermal-hydraulic processes following the loss of the residual heat removal system during shutdown. Thus, transients of this kind have been simulated using best-estimate codes in different integral test facilities and compared with experimental data obtained in different facilities. In PKL (Primaerkreislauf-Versuchsanlage, primarymore » coolant loop test facility) test facility different series of experiments have been undertaken to analyze the plant response in shutdown. In this context, the E3 and F2 series consist of analyzing the loss of the residual heat removal system with a reduced inventory in the primary system. In particular, the experiments were developed to investigate the influence of the steam generators secondary side configuration on the plant response, what involves the consideration of different number of steam generators filled with water and ready for activation, on the heat transfer mechanisms inside the steam generators U-tubes. This work presents the results of such experiments calculated using, RELAP5/Mod 3.3. (authors)« less
33 CFR 127.1205 - Emergency shutdown.
Code of Federal Regulations, 2011 CFR
2011-07-01
...) WATERFRONT FACILITIES WATERFRONT FACILITIES HANDLING LIQUEFIED NATURAL GAS AND LIQUEFIED HAZARDOUS GAS Waterfront Facilities Handling Liquefied Hazardous Gas Equipment § 127.1205 Emergency shutdown. (a) Each... elements that melt at less than 105 °C (221 °F) and activate the emergency shutdown, or have a sensor that...
33 CFR 127.1205 - Emergency shutdown.
Code of Federal Regulations, 2010 CFR
2010-07-01
...) WATERFRONT FACILITIES WATERFRONT FACILITIES HANDLING LIQUEFIED NATURAL GAS AND LIQUEFIED HAZARDOUS GAS Waterfront Facilities Handling Liquefied Hazardous Gas Equipment § 127.1205 Emergency shutdown. (a) Each... elements that melt at less than 105 °C (221 °F) and activate the emergency shutdown, or have a sensor that...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lisowski, D. D.; Farmer, M. T.; Lomperski, S.
The Natural convection Shutdown heat removal Test Facility (NSTF) is a large scale thermal hydraulics test facility that has been built at Argonne National Laboratory (ANL). The facility was constructed in order to carry out highly instrumented experiments that can be used to validate the performance of passive safety systems for advanced reactor designs. The facility has principally been designed for testing of Reactor Cavity Cooling System (RCCS) concepts that rely on natural convection cooling for either air or water-based systems. Standing 25-m in height, the facility is able to supply up to 220 kW at 21 kW/m 2 tomore » accurately simulate the heat fluxes at the walls of a reactor pressure vessel. A suite of nearly 400 data acquisition channels, including a sophisticated fiber optic system for high density temperature measurements, guides test operations and provides data to support scaling analysis and modeling efforts. Measurements of system mass flow rate, air and surface temperatures, heat flux, humidity, and pressure differentials, among others; are part of this total generated data set. The following report provides an introduction to the top level-objectives of the program related to passively safe decay heat removal, a detailed description of the engineering specifications, design features, and dimensions of the test facility at Argonne. Specifications of the sensors and their placement on the test facility will be provided, along with a complete channel listing of the data acquisition system.« less
Pretest predictions for degraded shutdown heat-removal tests in THORS-SHRS Assembly 1. [LMFBR
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rose, S.D.; Carbajo, J.J.
The recent modification of the Thermal-Hydraulic Out-of-Reactor Safety (THORS) facility at ORNL will allow testing of parallel simulated fuel assemblies under natural-convection and low-flow forced-convection conditions similar to those that might occur during a partial failure of the Shutdown Heat Removal System (SHRS) of an LMFBR. An extensive test program has been prepared and testing will be started in September 1983. THORS-SHRS Assembly 1 consists of two 19-pin bundles in parallel with a third leg serving as a bypass line and containing a sodium-to-sodium intermediate heat exchanger. Testing at low powers wil help indicate the maximum amount of heat thatmore » can be removed from the reactor core during conditions of degraded shutdown heat removal. The thermal-hydraulic behavior of the test bundles will be characterized for single-phase and two-phase conditions up to dryout. The influence of interassembly flow redistribution including transients from forced- to natural-convection conditions will be investigated during testing.« less
33 CFR 127.205 - Emergency shutdown.
Code of Federal Regulations, 2010 CFR
2010-07-01
...) WATERFRONT FACILITIES WATERFRONT FACILITIES HANDLING LIQUEFIED NATURAL GAS AND LIQUEFIED HAZARDOUS GAS Waterfront Facilities Handling Liquefied Natural Gas Equipment § 127.205 Emergency shutdown. Each transfer... automatically when the fixed sensors under § 127.201(b) measure LNG concentrations exceeding 40% of the lower...
33 CFR 127.205 - Emergency shutdown.
Code of Federal Regulations, 2011 CFR
2011-07-01
...) WATERFRONT FACILITIES WATERFRONT FACILITIES HANDLING LIQUEFIED NATURAL GAS AND LIQUEFIED HAZARDOUS GAS Waterfront Facilities Handling Liquefied Natural Gas Equipment § 127.205 Emergency shutdown. Each transfer... automatically when the fixed sensors under § 127.201(b) measure LNG concentrations exceeding 40% of the lower...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Moran, B.; Stern, W.; Colley, J.
International Atomic Energy Agency (IAEA) safeguards involves verification activities at a wide range of facilities in a variety of operational phases (e.g., under construction, start-up, operating, shutdown, closed-down, and decommissioned). Safeguards optimization for each different facility type and operational phase is essential for the effectiveness of safeguards implementation. The IAEA’s current guidance regarding safeguards for the different facility types in the various lifecycle phases is provided in its Design Information Examination (DIE) and Verification (DIV) procedure. 1 Greater efficiency in safeguarding facilities that are shut down or closed down, including those being decommissioned, could allow the IAEA to use amore » greater portion of its effort to conduct other verification activities. Consequently, the National Nuclear Security Administration’s Office of International Nuclear Safeguards sponsored this study to evaluate whether there is an opportunity to optimize safeguards approaches for facilities that are shutdown or closed-down. The purpose of this paper is to examine existing safeguards approaches for shutdown and closed-down facilities, including facilities being decommissioned, and to seek to identify whether they may be optimized.« less
40 CFR 63.762 - Startups, shutdowns, and malfunctions.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 11 2012-07-01 2012-07-01 false Startups, shutdowns, and malfunctions... Facilities § 63.762 Startups, shutdowns, and malfunctions. (a) The provisions set forth in this subpart shall apply at all times except during startups or shutdowns, during malfunctions, and during periods of non...
40 CFR 63.762 - Startups, shutdowns, and malfunctions.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 10 2010-07-01 2010-07-01 false Startups, shutdowns, and malfunctions... Facilities § 63.762 Startups, shutdowns, and malfunctions. (a) The provisions set forth in this subpart shall apply at all times except during startups or shutdowns, during malfunctions, and during periods of non...
40 CFR 63.1272 - Startups, shutdowns, and malfunctions.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 11 2011-07-01 2011-07-01 false Startups, shutdowns, and malfunctions... Facilities § 63.1272 Startups, shutdowns, and malfunctions. (a) The provisions set forth in this subpart shall apply at all times except during startups or shutdowns, during malfunctions, and during periods of...
40 CFR 63.1272 - Startups, shutdowns, and malfunctions.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 12 2012-07-01 2011-07-01 true Startups, shutdowns, and malfunctions... Facilities § 63.1272 Startups, shutdowns, and malfunctions. (a) The provisions set forth in this subpart shall apply at all times except during startups or shutdowns, during malfunctions, and during periods of...
40 CFR 63.762 - Startups, shutdowns, and malfunctions.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 10 2011-07-01 2011-07-01 false Startups, shutdowns, and malfunctions... Facilities § 63.762 Startups, shutdowns, and malfunctions. (a) The provisions set forth in this subpart shall apply at all times except during startups or shutdowns, during malfunctions, and during periods of non...
40 CFR 63.1272 - Startups, shutdowns, and malfunctions.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 11 2010-07-01 2010-07-01 true Startups, shutdowns, and malfunctions... Facilities § 63.1272 Startups, shutdowns, and malfunctions. (a) The provisions set forth in this subpart shall apply at all times except during startups or shutdowns, during malfunctions, and during periods of...
ERIC Educational Resources Information Center
Day, C. William
1999-01-01
Examines the planning process to identify equipment or systems within an educational facility that could be Y2K sensitive. Discusses developing a contingency plan to prevent operational shutdown. Concluding comments describe a simple Y2K equipment-testing procedure. (GR)
Code of Federal Regulations, 2014 CFR
2014-07-01
... to minimize emissions from startup, shutdown, and malfunction events. 270.235 Section 270.235... from startup, shutdown, and malfunction events. (a) Facilities with existing permits—(1) Revisions to... from startup, shutdown, and malfunction events under any of the following options when requesting...
Code of Federal Regulations, 2012 CFR
2012-07-01
... to minimize emissions from startup, shutdown, and malfunction events. 270.235 Section 270.235... from startup, shutdown, and malfunction events. (a) Facilities with existing permits—(1) Revisions to... from startup, shutdown, and malfunction events under any of the following options when requesting...
Code of Federal Regulations, 2011 CFR
2011-07-01
... to minimize emissions from startup, shutdown, and malfunction events. 270.235 Section 270.235... from startup, shutdown, and malfunction events. (a) Facilities with existing permits—(1) Revisions to... from startup, shutdown, and malfunction events under any of the following options when requesting...
Code of Federal Regulations, 2013 CFR
2013-07-01
... to minimize emissions from startup, shutdown, and malfunction events. 270.235 Section 270.235... from startup, shutdown, and malfunction events. (a) Facilities with existing permits—(1) Revisions to... from startup, shutdown, and malfunction events under any of the following options when requesting...
Startup, Shutdown, & Malfunction (SSM) Emissions at Industrial Facilities
EPA issued a final action to ensure states have plans in place that are fully consistent with the Clean Air Act and recent court decisions concerning startup, shutdown and malfunction (SSM) operations.
Decontamination and decommissioning of the Mayaguez (Puerto Rico) facility
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jackson, P.K.; Freemerman, R.L.
1989-11-01
On February 6, 1987 the US Department of Energy (DOE) awarded the final phase of the decontamination and decommissioning of the nuclear and reactor facilities at the Center for Energy and Environmental Research (CEER), in Mayaguez, Puerto Rico. Bechtel National, Inc., was made the decontamination and decommissioning (D and D) contractor. The goal of the project was to enable DOE to proceed with release of the CEER facility for use by the University of Puerto Rico, who was the operator. This presentation describes that project and lesson learned during its progress. The CEER facility was established in 1957 as themore » Puerto Rico Nuclear Center, a part of the Atoms for Peace Program. It was a nuclear training and research institution with emphasis on the needs of Latin America. It originally consisted of a 1-megawatt Materials Testing Reactor (MTR), support facilities and research laboratories. After eleven years of operation the MTR was shutdown and defueled. A 2-megawatt TRIGA reactor was installed in 1972 and operated until 1976, when it woo was shutdown. Other radioactive facilities at the center included a 10-watt homogeneous L-77 training reactor, a natural uranium graphite-moderated subcritical assembly, a 200KV particle accelerator, and a 15,000 Ci Co-60 irradiation facility. Support facilities included radiochemistry laboratories, counting rooms and two hot cells. As the emphasis shifted to non-nuclear energy technology a name change resulted in the CEER designation, and plans were started for the decontamination and decommissioning effort.« less
Characteristics of dioxin emissions at startup and shutdown of MSW incinerators.
Tejima, Hajime; Nishigaki, Masahide; Fujita, Yasuyuki; Matsumoto, Akihiro; Takeda, Nobuo; Takaoka, Masaki
2007-01-01
Dioxin concentrations from municipal waste incinerators in Japan and elsewhere often show low concentrations that comply with legal limits (in this paper, the term "dioxin" designates WHO-TEQ: PCDD/Fs+dioxin-like PCB). However, such data is usually generated under normal steady state operational conditions, and there has been little investigation of releases occurring during startup and shutdown. It is important, therefore, to ascertain quantitatively emissions in an unsteady state (startup and shutdown) in order to correctly evaluate the relationship between emissions from a facility and the surrounding environment. The present study aimed to examine dioxin emissions of a continuously operated incinerator at startup and shutdown, and estimating the time period of greatest emission, and the processes causing dioxin generation. The startup process was divided into five stages and the shutdown into two; at each stage, dioxins in the flue gas were measured at the boiler outlet and the stack. From the concentration of dioxins and the flue gas volume at each stage, the amount of dioxins at startup and shutdown were calculated, and these were compared with that under steady state conditions. Dioxin concentration at the stack under steady state conditions was a very low level, while those at startup and shutdown were higher. In the case where dioxin concentration under a steady state is a low level like in this study, it is indicated that the total annual dioxin emission from a facility could be attributed to the startup periods.
A large high vacuum, high pumping speed space simulation chamber for electric propulsion
NASA Technical Reports Server (NTRS)
Grisnik, Stanley P.; Parkes, James E.
1994-01-01
Testing high power electric propulsion devices poses unique requirements on space simulation facilities. Very high pumping speeds are required to maintain high vacuum levels while handling large volumes of exhaust products. These pumping speeds are significantly higher than those available in most existing vacuum facilities. There is also a requirement for relatively large vacuum chamber dimensions to minimize facility wall/thruster plume interactions and to accommodate far field plume diagnostic measurements. A 4.57 m (15 ft) diameter by 19.2 m (63 ft) long vacuum chamber at NASA Lewis Research Center is described. The chamber utilizes oil diffusion pumps in combination with cryopanels to achieve high vacuum pumping speeds at high vacuum levels. The facility is computer controlled for all phases of operation from start-up, through testing, to shutdown. The computer control system increases the utilization of the facility and reduces the manpower requirements needed for facility operations.
49 CFR 192.167 - Compressor stations: Emergency shutdown.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Components § 192.167 Compressor stations: Emergency shutdown. (a) Except for unattended field compressor... fires, and electrical facilities in the vicinity of gas headers and in the compressor building, except that: (i) Electrical circuits that supply emergency lighting required to assist station personnel in...
49 CFR 192.167 - Compressor stations: Emergency shutdown.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Components § 192.167 Compressor stations: Emergency shutdown. (a) Except for unattended field compressor... fires, and electrical facilities in the vicinity of gas headers and in the compressor building, except that: (i) Electrical circuits that supply emergency lighting required to assist station personnel in...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-07-01
Volume 4 contains the following appendices: nuclear reactors at educational institutions in the United States; data sheets for nuclear reactors at educational institutions in the United States(operational reactors and shut-down reactors); supplemental data for Fort St. Vrain spent fuel; supplemental data for Peach Bottom 1 spent fuel; and supplemental data for Fast Flux Test Facility.
Nuclear Thermal Rocket Element Environmental Simulator (NTREES) Upgrade Activities
NASA Technical Reports Server (NTRS)
Emrich, William J. Jr.; Moran, Robert P.; Pearson, J. Boise
2012-01-01
To support the on-going nuclear thermal propulsion effort, a state-of-the-art non nuclear experimental test setup has been constructed to evaluate the performance characteristics of candidate fuel element materials and geometries in representative environments. The facility to perform this testing is referred to as the Nuclear Thermal Rocket Element Environment Simulator (NTREES). This device can simulate the environmental conditions (minus the radiation) to which nuclear rocket fuel components will be subjected during reactor operation. Test articles mounted in the simulator are inductively heated in such a manner so as to accurately reproduce the temperatures and heat fluxes which would normally occur as a result of nuclear fission and would be exposed to flowing hydrogen. Initial testing of a somewhat prototypical fuel element has been successfully performed in NTREES and the facility has now been shutdown to allow for an extensive reconfiguration of the facility which will result in a significant upgrade in its capabilities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lisowski, Darius D.; Kraus, Adam R.; Bucknor, Matthew D.
A 1/2 scale test facility has been constructed at Argonne National Laboratory to study the heat removal performance and natural circulation flow patterns in a Reactor Cavity Cooling System (RCCS). Our test facility, the Natural convection Shutdown heat removal Test Facility (NSTF), supports the broader goal of developing an inherently safe and fully passive ex-vessel decay heat removal for advanced reactor designs. The project, initiated in 2010 to support the Advanced Reactor Technologies (ART), Small Modular Reactor (SMR), and Next Generation Nuclear Plant (NGNP) programs, has been conducting experimental operations since early 2014. The following paper provides a summary ofmore » some primary design features of the 26-m tall test facility along with a description of the data acquisition suite that guides our experimental practices. Specifics of the distributed fiber optic temperature measurements will be discussed, which introduces an unparalleled level of data density that has never before been implemented in a large scale natural circulation test facility. Results from our test series will then be presented, which provide insight into the thermal hydraulic behavior at steady-state and transient conditions for varying heat flux levels and exhaust chimney configuration states. (C) 2016 Elsevier B.V. All rights reserved.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-31
...., Crystal River Unit 3 Nuclear Generating Plant Post-Shutdown Decommissioning Activities Report AGENCY...) Accession No. ML13340A009), for the Crystal River Unit 3 Nuclear Generating Plant (CR-3). The PSDAR provides.... until 9 p.m., EST, at the Crystal River Nuclear Plant Training Center/Emergency Operations Facility...
Nuclear Thermal Rocket Element Environmental Simulator (NTREES) Phase II Upgrade Activities
NASA Technical Reports Server (NTRS)
Emrich, William J.; Moran, Robert P.; Pearson, J. Bose
2013-01-01
To support the on-going nuclear thermal propulsion effort, a state-of-the-art non nuclear experimental test setup has been constructed to evaluate the performance characteristics of candidate fuel element materials and geometries in representative environments. The facility to perform this testing is referred to as the Nuclear Thermal Rocket Element Environment Simulator (NTREES). This device can simulate the environmental conditions (minus the radiation) to which nuclear rocket fuel components will be subjected during reactor operation. Test articles mounted in the simulator are inductively heated in such a manner so as to accurately reproduce the temperatures and heat fluxes which would normally occur as a result of nuclear fission and would be exposed to flowing hydrogen. Initial testing of a somewhat prototypical fuel element has been successfully performed in NTREES and the facility has now been shutdown to allow for an extensive reconfiguration of the facility which will result in a significant upgrade in its capabilities. Keywords: Nuclear Thermal Propulsion, Simulator
RHETT/EPDM Performance Characterization
NASA Technical Reports Server (NTRS)
Haag, T.; Osborn, M.
1998-01-01
The 0.6 kW Electric Propulsion Demonstration Module (EPDM) flight thruster system was tested in a large vacuum facility for performance measurements and functional checkout. The thruster was operated at a xenon flow rate of 3.01 mg/s, which was supplied through a self-contained propellant system. All power was provided through a flight-packaged power processing unit, which was mounted in vacuum on a cold plate. The thruster was cycled through 34 individual startup and shutdown sequences. Operating periods ranged from 3 to 3600 seconds. The system responded promptly to each command sequence and there were no involuntary shutdowns. Direct thrust measurements indicated that steady state thrust was temperature sensitive, and varied from a high of 41.7 mN at 16 C, to a low of 34.8 mN at 110 C. Short duration thruster firings showed rapid response and good repeatability.
Government Shutdown: Operations of Department of Defense During a Lapse in Appropriations
2011-04-01
proactive in working with creditors to reschedule debt repayments under these circumstances… c. Military personnel: During a shutdown of DoD activities due...creditors to reschedule debt repayments under these circumstances. The key point that both the creditor and the soldier should remember is that the...including Uniformed Services Treatment Facilities) including doctors, nurses , medical technicians, dentists, and essential support personnel (cooks
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bucknor, Matthew; Hu, Rui; Lisowski, Darius
2016-04-17
The Reactor Cavity Cooling System (RCCS) is an important passive safety system being incorporated into the overall safety strategy for high temperature advanced reactor concepts such as the High Temperature Gas- Cooled Reactors (HTGR). The Natural Convection Shutdown Heat Removal Test Facility (NSTF) at Argonne National Laboratory (Argonne) reflects a 1/2-scale model of the primary features of one conceptual air-cooled RCCS design. The project conducts ex-vessel, passive heat removal experiments in support of Department of Energy Office of Nuclear Energy’s Advanced Reactor Technology (ART) program, while also generating data for code validation purposes. While experiments are being conducted at themore » NSTF to evaluate the feasibility of the passive RCCS, parallel modeling and simulation efforts are ongoing to support the design, fabrication, and operation of these natural convection systems. Both system-level and high fidelity computational fluid dynamics (CFD) analyses were performed to gain a complete understanding of the complex flow and heat transfer phenomena in natural convection systems. This paper provides a summary of the RELAP5-3D NSTF model development efforts and provides comparisons between simulation results and experimental data from the NSTF. Overall, the simulation results compared favorably to the experimental data, however, further analyses need to be conducted to investigate any identified differences.« less
Altitude Testing of Large Liquid Propellant Engines
NASA Technical Reports Server (NTRS)
Maynard, Bryon T.; Raines, Nickey G.
2010-01-01
The National Aeronautics and Space Administration entered a new age on January 14, 2004 with President Bush s announcement of the creation the Vision for Space Exploration that will take mankind back to the Moon and on beyond to Mars. In January, 2006, after two years of hard, dedicated labor, engineers within NASA and its contractor workforce decided that the J2X rocket, based on the heritage of the Apollo J2 engine, would be the new engine for the NASA Constellation Ares upper stage vehicle. This engine and vehicle combination would provide assured access to the International Space Station to replace that role played by the Space Shuttle and additionally, would serve as the Earth Departure Stage, to push the Crew Excursion Vehicle out of Earth Orbit and head it on a path for rendezvous with the Moon. Test as you fly, fly as you test was chosen to be the guiding philosophy and a pre-requisite for the engine design, development, test and evaluation program. An exhaustive survey of national test facility assets proved the required capability to test the J2X engine at high altitude for long durations did not exist so therefore, a high altitude/near space environment testing capability would have to be developed. After several agency concepts the A3 High Altitude Testing Facility proposal was selected by the J2X engine program on March 2, 2007 and later confirmed by a broad panel of NASA senior leadership in May 2007. This facility is to be built at NASA s John C. Stennis Space Center located near Gulfport, Mississippi. 30 plus years of Space Shuttle Main Engine development and flight certification testing makes Stennis uniquely suited to support the Vision For Space Exploration Return to the Moon. Propellant handling infrastructure, engine assembly facilities, a trained and dedicated workforce and a broad and varied technical support base will all ensure that the A3 facility will be built on time to support the schedule needs of the J2X engine and the ultimate flight of the first Ares I vehicle. The A3 facility will be able to simulate pre-ignition altitude from sea-level to 100,000 feet and maintain it up to 650 seconds. Additionally the facility will be able to accommodate initial ignition, shutdown and then restart test profiles. A3 will produce up to 5000 lbm/sec of superheated steam utilizing a Chemical Steam generation system. Two separate inline steam ejectors will be used to produce a test cell vacuum to simulate the 100,000 ft required altitude. Operational capability will ensure that the facility can start up and shutdown without producing adverse pressure gradients across the J2X nozzle. The facility will have a modern thrust measurement system for accurate determination of engine performance. The latest advances in data acquisition and control will be incorporated to measure performance parameters during hotfire testing. Provisions are being made in the initial design of the new altitude facility to allow for testing of other, larger engines and potential upper stage launch vehicles that might require vacuum start testing of the engines. The new facility at Stennis Space Center will be complete and ready for hotfire operations in late 2010.
Maximizing sinter plant operating flexibility through emissions trading and air modeling
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schewe, G.J.; Wagner, J.A.; Heron, T.
1998-12-31
This paper provides details on the dispersion modeling analysis performed to demonstrate air quality impacts associated with an emission trading scheme for a sintering operation in Youngstown, Ohio. The emission trade was proposed to allow the sinter plant to expand its current allowable sulfur dioxide (SO2) emissions while being offset with SO{sub 2} emissions from boilers at a nearby shutdown steel mill. While the emission trade itself was feasible and the emissions required for the offset were available (the boiler shutdown and their subsequent SO{sub 2} emission credits were never claimed, banked, or used elsewhere), the second criteria for determiningmore » compliance was a demonstration of minimal air quality impact. The air analysis combined the increased ambient SO{sub 2} concentrations of the relaxed sinter plant emissions with the offsetting air quality of the shutdown boilers to yield the net air quality impacts. To test this net air impact, dispersion modeling was performed treating the sinter plant SO{sub 2} emissions as positive and the shutdown boiler SO{sub 2} emissions as negative. The results of the modeling indicated that the ambient air concentrations due to the proposed emissions increase will be offset by the nearby boiler emissions to levels acceptable under EPA`s offset policy Level 2 significant impact concentrations. Therefore, the dispersion modeling demonstrated that the emission trading scheme would not result in significant air quality impacts and maximum operating flexibility was provided to the sintering facility.« less
Multiple well-shutdown tests and site-scale flow simulation in fractured rocks
Tiedeman, Claire; Lacombe, Pierre J.; Goode, Daniel J.
2010-01-01
A new method was developed for conducting aquifer tests in fractured-rock flow systems that have a pump-and-treat (P&T) operation for containing and removing groundwater contaminants. The method involves temporary shutdown of individual pumps in wells of the P&T system. Conducting aquifer tests in this manner has several advantages, including (1) no additional contaminated water is withdrawn, and (2) hydraulic containment of contaminants remains largely intact because pumping continues at most wells. The well-shutdown test method was applied at the former Naval Air Warfare Center (NAWC), West Trenton, New Jersey, where a P&T operation is designed to contain and remove trichloroethene and its daughter products in the dipping fractured sedimentary rocks underlying the site. The detailed site-scale subsurface geologic stratigraphy, a three-dimensional MODFLOW model, and inverse methods in UCODE_2005 were used to analyze the shutdown tests. In the model, a deterministic method was used for representing the highly heterogeneous hydraulic conductivity distribution and simulations were conducted using an equivalent porous media method. This approach was very successful for simulating the shutdown tests, contrary to a common perception that flow in fractured rocks must be simulated using a stochastic or discrete fracture representation of heterogeneity. Use of inverse methods to simultaneously calibrate the model to the multiple shutdown tests was integral to the effectiveness of the approach.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Boyack, B.E.
The PIUS reactor utilizes simplified, inherent, passive, or other innovative means to accomplish safety functions. Accordingly, the PIUS reactor is subject to the requirements of 10CFR52.47(b)(2)(i)(A). This regulation requires that the applicant adequately demonstrate the performance of each safety feature, interdependent effects among the safety features, and a sufficient data base on the safety features of the design to assess the analytical tools used for safety analysis. Los Alamos has assessed the quality and completeness of the existing and planned data bases used by Asea Brown Boveri to validate its safety analysis codes and other relevant data bases. Only amore » limited data base of separate effect and integral tests exist at present. This data base is not adequate to fulfill the requirements of 10CFR52.47(b)(2)(i)(A). Asea Brown Boveri has stated that it plans to conduct more separate effect and integral test programs. If appropriately designed and conducted, these test programs have the potential to satisfy most of the data base requirements of 10CFR52.47(b)(2)(i)(A) and remedy most of the deficiencies of the currently existing combined data base. However, the most important physical processes in PIUS are related to reactor shutdown because the PIUS reactor does not contain rodded shutdown and control systems. For safety-related reactor shutdown, PIUS relies on negative reactivity insertions from the moderator temperature coefficient and from boron entering the core from the reactor pool. Asea Brown Boveri has neither developed a direct experimental data base for these important processes nor provided a rationale for indirect testing of these key PIUS processes. This is assessed as a significant shortcoming. In preparing the conclusions of this report, test documentation and results have been reviewed for only one integral test program, the small-scale integral tests conducted in the ATLE facility.« less
NASA Technical Reports Server (NTRS)
Young, Clarence P., Jr.; Balakrishna, S.; Kilgore, W. Allen
1995-01-01
A state-of-the-art, computerized mode protection and dynamic response monitoring system has been developed for the NASA Langley Research Center National Transonic Facility (NTF). This report describes the development of the model protection and shutdown system (MPSS). A technical description of the system is given along with discussions on operation and capabilities of the system. Applications of the system to vibration problems are presented to demonstrate the system capabilities, typical applications, versatility, and investment research return derived from the system to date. The system was custom designed for the NTF but can be used at other facilities or for other dynamic measurement/diagnostic applications. Potential commercial uses of the system are described. System capability has been demonstrated for forced response testing and for characterizing and quantifying bias errors for onboard inertial model attitude measurement devices. The system is installed in the NTF control room and has been used successfully for monitoring, recording and analyzing the dynamic response of several model systems tested in the NTF.
Simulation of Cold Flow in a Truncated Ideal Nozzle with Film Cooling
NASA Technical Reports Server (NTRS)
Braman, Kalen; Ruf, Joseph
2015-01-01
Flow transients during rocket start-up and shut-down can lead to significant side loads on rocket nozzles. The capability to estimate these side loads computationally can streamline the nozzle design process. Towards this goal, the flow in a truncated ideal contour (TIC) nozzle has been simulated for a range of nozzle pressure ratios (NPRs) aimed to match a series of cold flow experiments performed at the NASA MSFC Nozzle Test Facility. These simulations were performed with varying turbulence model choices and with four different versions of the TIC nozzle model geometry, each of which was created with a different simplification to the test article geometry.
78 FR 67344 - Sunshine Act Meeting; New Time and Date of Proceeding
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-12
... DEFENSE NUCLEAR FACILITIES SAFETY BOARD Sunshine Act Meeting; New Time and Date of Proceeding AGENCY: Defense Nuclear Facilities Safety Board. ACTION: Notice of Public Meeting and Hearing; New Time... the postponement in the Federal Register due to the shutdown. The Board has now decided on a new time...
40 CFR 60.2918 - What happens during periods of startup, shutdown, and malfunction?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 6 2011-07-01 2011-07-01 false What happens during periods of startup... of startup, shutdown, and malfunction? The emission limitations and operating limits apply at all times except during OSWI unit startups, shutdowns, or malfunctions. Performance Testing ...
40 CFR 60.2918 - What happens during periods of startup, shutdown, and malfunction?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 6 2010-07-01 2010-07-01 false What happens during periods of startup... of startup, shutdown, and malfunction? The emission limitations and operating limits apply at all times except during OSWI unit startups, shutdowns, or malfunctions. Performance Testing ...
40 CFR 60.2918 - What happens during periods of startup, shutdown, and malfunction?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 7 2012-07-01 2012-07-01 false What happens during periods of startup... of startup, shutdown, and malfunction? The emission limitations and operating limits apply at all times except during OSWI unit startups, shutdowns, or malfunctions. Performance Testing ...
Safe, Cost Effective Management of Inactive Facilities at the Savannah River Site
DOE Office of Scientific and Technical Information (OSTI.GOV)
Austin, W. E.; Yannitell, D. M.; Freeman, D. W.
The Savannah River Site is part of the U.S. Department of Energy complex. It was constructed during the early 1950s to produce basic materials (such as plutonium-239 and tritium) used in the production of nuclear weapons. The 310-square-mile site is located in South Carolina, about 12 miles south of Aiken, South Carolina, and about 15 miles southeast of Augusta, Georgia. Savannah River Site (SRS) has approximately 200 facilities identified as inactive. These facilities range in size and complexity from large nuclear reactors to small storage buildings. These facilities are located throughout the site including three reactor areas, the heavy watermore » plant area, the manufacturing area, and other research and support areas. Unlike DOE Closure Sites such as Hanford and Rocky Flats, SRS is a Project Completion Site with continuing missions. As facilities complete their defined mission, they are shutdown and transferred from operations to the facility disposition program. At the SRS, Facilities Decontamination and Decommissioning (FDD) personnel manage the disposition phase of a inactive facility's life cycle in a manner that minimizes life cycle cost without compromising (1) the health or safety of workers and the public or (2) the quality of the environment. The disposition phase begins upon completion of operations shutdown and extends through establishing the final end-state. FDD has developed innovative programs to manage their responsibilities within a constrained budget.« less
Extended test of a xenon hollow cathode for a space plasma contactor
NASA Technical Reports Server (NTRS)
Sarver-Verhey, Timothy R.
1994-01-01
Implementation of a hollow cathode plasma contactor for charge control on the Space Station has required validation of long-life hollow cathodes. A test series of hollow cathodes and hollow cathode plasma contactors was initiated as part of the plasma contactor development program. An on-going wear-test of a hollow cathode has demonstrated cathode operation in excess of 4700 hours with small changes in operating parameters. The discharge experienced 4 shutdowns during the test, all of which were due to test facility failures or expellant replenishment. In all cases, the cathode was reignited at approximately 42 volts and resumed typical operation. This test represents the longest demonstrated stable operation of a high current (greater than 1A) xenon hollow cathode reported to date.
Continuing life test of a xenon hollow cathode for a space plasma contactor
NASA Technical Reports Server (NTRS)
Sarver-Verhey, Timothy R.
1994-01-01
Implementation of a hollow cathode plasma contactor for charge control on the Space Station has required validation of long-life hollow cathodes. A test series of hollow cathodes and hollow cathode plasma contactors was initiated as part of the plasma contactor development program. An on-going wear-test of a hollow cathode has demonstrated cathode operation in excess of 10,000 hours with small changes in operating parameters. The discharge has experienced 10 shutdowns during the test, all of which were due to test facility failures or expellant replenishment. In all cases, the cathode was re-ignited at approximately 42 volts and resumed typical operation. This test represents the longest demonstrated stable operation of a high current (greater than 1 A) xenon hollow cathode reported to date.
NASA Technical Reports Server (NTRS)
2005-01-01
This feature length DVD documentary, reviews the history of the Plum Brook Nuclear Reactor from the initial settlers of the area, through its use as a munitions facility during the second World War to the development of the nuclear facility and its use as one of the first nuclear test reactors built in the United States, and the only one built by NASA. It concludes with the beginning of the decommissioning of the facility. There is a brief review of the reactor design, and its workings. Through discussions with the NASA engineers and operators of the facility, the film reviews the work done to advance the knowledge of the effects of radiation, the properties of radiated materials, and the work to advance the state of the art in nuclear propulsion. The film shows footage of public tours, and shows actual footage of the facility in operation, and after its shutdown in 1973. The DVD was narrated by Kate Mulgrew, who leads the viewer through the history of the facility to its eventual ongoing decommissioning, and return to the state of pastoral uses.
Dioxins from medical waste incineration: Normal operation and transient conditions.
Chen, Tong; Zhan, Ming-xiu; Yan, Mi; Fu, Jian-ying; Lu, Sheng-yong; Li, Xiao-dong; Yan, Jian-hua; Buekens, Alfons
2015-07-01
Polychlorinated dibenzo-p-dioxins (PCDDs) and polychlorinated dibenzofurans (PCDFs) are key pollutants in waste incineration. At present, incinerator managers and official supervisors focus only on emissions evolving during steady-state operation. Yet, these emissions may considerably be raised during periods of poor combustion, plant shutdown, and especially when starting-up from cold. Until now there were no data on transient emissions from medical (or hospital) waste incineration (MWI). However, MWI is reputed to engender higher emissions than those from municipal solid waste incineration (MSWI). The emission levels in this study recorded for shutdown and start-up, however, were significantly higher: 483 ± 184 ng Nm(-3) (1.47 ± 0.17 ng I-TEQ Nm(-3)) for shutdown and 735 ng Nm(-3) (7.73 ng I-TEQ Nm(-3)) for start-up conditions, respectively. Thus, the average (I-TEQ) concentration during shutdown is 2.6 (3.8) times higher than the average concentration during normal operation, and the average (I-TEQ) concentration during start-up is 4.0 (almost 20) times higher. So monitoring should cover the entire incineration cycle, including start-up, operation and shutdown, rather than optimised operation only. This suggestion is important for medical waste incinerators, as these facilities frequently start up and shut down, because of their small size, or of lacking waste supply. Forthcoming operation should shift towards much longer operating cycles, i.e., a single weekly start-up and shutdown. © The Author(s) 2015.
Basis for Interim Operation for Fuel Supply Shutdown Facility
DOE Office of Scientific and Technical Information (OSTI.GOV)
BENECKE, M.W.
2003-02-03
This document establishes the Basis for Interim Operation (BIO) for the Fuel Supply Shutdown Facility (FSS) as managed by the 300 Area Deactivation Project (300 ADP) organization in accordance with the requirements of the Project Hanford Management Contract procedure (PHMC) HNF-PRO-700, ''Safety Analysis and Technical Safety Requirements''. A hazard classification (Benecke 2003a) has been prepared for the facility in accordance with DOE-STD-1027-92 resulting in the assignment of Hazard Category 3 for FSS Facility buildings that store N Reactor fuel materials (303-B, 3712, and 3716). All others are designated Industrial buildings. It is concluded that the risks associated with the currentmore » and planned operational mode of the FSS Facility (uranium storage, uranium repackaging and shipment, cleanup, and transition activities, etc.) are acceptable. The potential radiological dose and toxicological consequences for a range of credible uranium storage building have been analyzed using Hanford accepted methods. Risk Class designations are summarized for representative events in Table 1.6-1. Mitigation was not considered for any event except the random fire event that exceeds predicted consequences based on existing source and combustible loading because of an inadvertent increase in combustible loading. For that event, a housekeeping program to manage transient combustibles is credited to reduce the probability. An additional administrative control is established to protect assumptions regarding source term by limiting inventories of fuel and combustible materials. Another is established to maintain the criticality safety program. Additional defense-in-depth controls are established to perform fire protection system testing, inspection, and maintenance to ensure predicted availability of those systems, and to maintain the radiological control program. It is also concluded that because an accidental nuclear criticality is not credible based on the low uranium enrichment, the form of the uranium, and the required controls, a Criticality Alarm System (CAS) is not required as allowed by DOE Order 420.1 (DOE 2000).« less
A New Foil Air Bearing Test Rig for Use to 700 C and 70,000 rpm
NASA Technical Reports Server (NTRS)
DellaCorte, Chris
1997-01-01
A new test rig has been developed for evaluating foil air bearings at high temperatures and speeds. These bearings are self acting hydrodynamic air bearings which have been successfully applied to a variety of turbomachinery operating up to 650 C. This unique test rig is capable of measuring bearing torque during start-up, shut-down and high speed operation. Load capacity and general performance characteristics, such as durability, can be measured at temperatures to 700 C and speeds to 70,000 rpm. This paper describes the new test rig and demonstrates its capabilities through the preliminary characterization of several bearings. The bearing performance data from this facility can be used to develop advanced turbomachinery incorporating high temperature oil-free air bearing technology.
ERIC Educational Resources Information Center
Schwing, Carl M.
This guide describes standard operating job procedures for the digestion process of wastewater treatment facilities. This process is for reducing the volume of sludge to be treated in subsequent units and to reduce the volatile content of sludge. The guide gives step-by-step instructions for pre-startup, startup, continuous operating, shutdown,…
Altitude Test Cell in the Four Burner Area
1947-10-21
One of the two altitude simulating-test chambers in Engine Research Building at the National Advisory Committee for Aeronautics (NACA) Lewis Flight Propulsion Laboratory. The two chambers were collectively referred to as the Four Burner Area. NACA Lewis’ Altitude Wind Tunnel was the nation’s first major facility used for testing full-scale engines in conditions that realistically simulated actual flight. The wind tunnel was such a success in the mid-1940s that there was a backlog of engines waiting to be tested. The Four Burner chambers were quickly built in 1946 and 1947 to ease the Altitude Wind Tunnel’s congested schedule. The Four Burner Area was located in the southwest wing of the massive Engine Research Building, across the road from the Altitude Wind Tunnel. The two chambers were 10 feet in diameter and 60 feet long. The refrigeration equipment produced the temperatures and the exhauster equipment created the low pressures present at altitudes up to 60,000 feet. In 1947 the Rolls Royce Nene was the first engine tested in the new facility. The mechanic in this photograph is installing a General Electric J-35 engine. Over the next ten years, a variety of studies were conducted using the General Electric J-47 and Wright Aeronautical J-65 turbojets. The two test cells were occasionally used for rocket engines between 1957 and 1959, but other facilities were better suited to the rocket engine testing. The Four Burner Area was shutdown in 1959. After years of inactivity, the facility was removed from the Engine Research Building in late 1973 in order to create the High Temperature and Pressure Combustor Test Facility.
40 CFR 63.1590 - What reports must I submit?
Code of Federal Regulations, 2010 CFR
2010-07-01
... continuing compliance; (iv) The type and quantity of HAP emitted by your POTW treatment plant; (v) A... notification of performance tests; a performance test report; a startup, shutdown, and malfunction report; and... prior to beginning operation of your new or reconstructed POTW. You must also submit a startup, shutdown...
40 CFR 63.1590 - What reports must I submit?
Code of Federal Regulations, 2011 CFR
2011-07-01
... continuing compliance; (iv) The type and quantity of HAP emitted by your POTW treatment plant; (v) A... notification of performance tests; a performance test report; a startup, shutdown, and malfunction report; and... prior to beginning operation of your new or reconstructed POTW. You must also submit a startup, shutdown...
Optimization of Treatment to Conserve Water at the US Naval Academy
2009-05-06
Established 1845 • 1,160 Acres • 3.46 MGD Iron Removal WTP : • Constructed 1971 • Modifications in 1998 & 2004 5/6/2009 Source Water: • 3 wells...5/6/2009 5/6/2009 Title 5/6/2009 WTP Operations: • Manned 24/7 but operated 14 hrs/day • 1.8 MGD average production • 50,000 g/hr blow-down from...experience for future on-site facility 16 Title/Group/Section,etc. 5/6/2009 5/6/2009 Minimize Plant Shutdowns: • Most WTPs operate best 24/7 • Ea. shut-down
Experimental investigation of a new method for advanced fast reactor shutdown cooling
NASA Astrophysics Data System (ADS)
Pakholkov, V. V.; Kandaurov, A. A.; Potseluev, A. I.; Rogozhkin, S. A.; Sergeev, D. A.; Troitskaya, Yu. I.; Shepelev, S. F.
2017-07-01
We consider a new method for fast reactor shutdown cooling using a decay heat removal system (DHRS) with a check valve. In this method, a coolant from the decay heat exchanger (DHX) immersed into the reactor upper plenum is supplied to the high-pressure plenum and, then, inside the fuel subassemblies (SAs). A check valve installed at the DHX outlet opens by the force of gravity after primary pumps (PP-1) are shut down. Experimental studies of the new and alternative methods of shutdown cooling were performed at the TISEY test facility at OKBM. The velocity fields in the upper plenum of the reactor model were obtained using the optical particle image velocimetry developed at the Institute of Applied Physics (Russian Academy of Sciences). The study considers the process of development of natural circulation in the reactor and the DHRS models and the corresponding evolution of the temperature and velocity fields. A considerable influence of the valve position in the displacer of the primary pump on the natural circulation of water in the reactor through the DHX was discovered (in some modes, circulation reversal through the DHX was obtained). Alternative DHRS designs without a shell at the DHX outlet with open and closed check valve are also studied. For an open check valve, in spite of the absence of a shell, part of the flow is supplied through the DHX pipeline and then inside the SA simulators. When simulating power modes of the reactor operation, temperature stratification of the liquid was observed, which increased in the cooling mode via the DHRS. These data qualitatively agree with the results of tests at BN-600 and BN-800 reactors.
Early Results from Solar Dynamic Space Power System Testing
NASA Technical Reports Server (NTRS)
Shaltens, Richard K.; Mason, Lee S.
1996-01-01
A government/industry team designed, built and tested a 2-kWe solar dynamic space power system in a large thermal vacuum facility with a simulated Sun at the NASA Lewis Research Center. The Lewis facility provides an accurate simulation of temperatures, high vacuum and solar flux as encountered in low-Earth orbit. The solar dynamic system includes a Brayton power conversion unit integrated with a solar receiver which is designed to store energy for continuous power operation during the eclipse phase of the orbit. This paper reviews the goals and status of the Solar Dynamic Ground Test Demonstration project and describes the initial testing, including both operational and performance data. System testing to date has accumulated over 365 hours of power operation (ranging from 400 watts to 2.0-W(sub e)), including 187 simulated orbits, 16 ambient starts and 2 hot restarts. Data are shown for an orbital startup, transient and steady-state orbital operation and shutdown. System testing with varying insolation levels and operating speeds is discussed. The solar dynamic ground test demonstration is providing the experience and confidence toward a successful flight demonstration of the solar dynamic technologies on the Space Station Mir in 1997.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-29
...,'' Revision 2, and Nuclear Energy [Institute] (NEI) 00- 01, ``Guidance for Post-Fire Safe-Shutdown Circuit... environmental impact statement or environmental assessment need be prepared for these amendments. If the...
As Universities Close Their Reactors, Energy Dept. Considers a Policy Shift.
ERIC Educational Resources Information Center
Southwick, Ron
2001-01-01
Discusses how, as many universities shut down their nuclear reactors used for research and training, the Energy Department considers moving its support to regional facilities, a change that might lead to more shutdowns. (EV)
NASA Astrophysics Data System (ADS)
Wang, Shilong; Yin, Changchun; Lin, Jun; Yang, Yu; Hu, Xueyan
2016-03-01
Cooperative work of multiple magnetic transmitting sources is a new trend in the development of transient electromagnetic system. The key is the bipolar current waves shutdown, concurrently in the inductive load. In the past, it was difficult to use the constant clamping voltage technique to realize the synchronized shutdown of currents with different peak values. Based on clamping voltage technique, we introduce a new controlling method with constant shutdown time. We use the rising time to control shutdown time and use low voltage power source to control peak current. From the viewpoint of the circuit energy loss, by taking the high-voltage capacitor bypass resistance and the capacitor of the passive snubber circuit into account, we establish the relationship between the rising time and the shutdown time. Since the switch is not ideal, we propose a new method to test the shutdown time by the low voltage, the high voltage and the peak current. Experimental results show that adjustment of the current rising time can precisely control the value of the clamp voltage. When the rising time is fixed, the shutdown time is unchanged. The error for shutdown time deduced from the energy consumption is less than 6%. The new controlling method on current shutdown proposed in this paper can be used in the cooperative work of borehole and ground transmitting system.
Wang, Shilong; Yin, Changchun; Lin, Jun; Yang, Yu; Hu, Xueyan
2016-03-01
Cooperative work of multiple magnetic transmitting sources is a new trend in the development of transient electromagnetic system. The key is the bipolar current waves shutdown, concurrently in the inductive load. In the past, it was difficult to use the constant clamping voltage technique to realize the synchronized shutdown of currents with different peak values. Based on clamping voltage technique, we introduce a new controlling method with constant shutdown time. We use the rising time to control shutdown time and use low voltage power source to control peak current. From the viewpoint of the circuit energy loss, by taking the high-voltage capacitor bypass resistance and the capacitor of the passive snubber circuit into account, we establish the relationship between the rising time and the shutdown time. Since the switch is not ideal, we propose a new method to test the shutdown time by the low voltage, the high voltage and the peak current. Experimental results show that adjustment of the current rising time can precisely control the value of the clamp voltage. When the rising time is fixed, the shutdown time is unchanged. The error for shutdown time deduced from the energy consumption is less than 6%. The new controlling method on current shutdown proposed in this paper can be used in the cooperative work of borehole and ground transmitting system.
Nozzle Side Load Testing and Analysis at Marshall Space Flight Center
NASA Technical Reports Server (NTRS)
Ruf, Joseph H.; McDaniels, David M.; Brown, Andrew M.
2009-01-01
Realistic estimates of nozzle side loads, the off-axis forces that develop during engine start and shutdown, are important in the design cycle of a rocket engine. The estimated magnitude of the nozzle side loads has a large impact on the design of the nozzle shell and the engine s thrust vector control system. In 2004 Marshall Space Flight Center (MSFC) began developing a capability to quantify the relative magnitude of side loads caused by different types of nozzle contours. The MSFC Nozzle Test Facility was modified to measure nozzle side loads during simulated nozzle start. Side load results from cold flow tests on two nozzle test articles, one with a truncated ideal contour and one with a parabolic contour are provided. The experimental approach, nozzle contour designs and wall static pressures are also discussed
Practical guide: Tools and methodologies for an oil and gas industry emission inventory
DOE Office of Scientific and Technical Information (OSTI.GOV)
Thompson, C.C.; Killian, T.L.
1996-12-31
During the preparation of Title V Permit applications, the quantification and speciation of emission sources from oil and gas facilities were reevaluated to determine the {open_quotes}potential-to-emit.{close_quotes} The existing emissions were primarily based on EPA emission factors such as AP-42, for tanks, combustion sources, and fugitive emissions from component leaks. Emissions from insignificant activities and routine operations that are associated with maintenance, startups and shutdowns, and releases to control devices also required quantification. To reconcile EPA emission factors with test data, process knowledge, and manufacturer`s data, a careful review of other estimation options was performed. This paper represents the results ofmore » this analysis of emission sources at oil and gas facilities, including exploration and production, compressor stations and gas plants.« less
40 CFR 63.6105 - What are my general requirements for complying with this subpart?
Code of Federal Regulations, 2011 CFR
2011-07-01
... to you at all times except during startup, shutdown, and malfunctions. (b) If you must comply with... times including during startup, shutdown, and malfunction. Testing and Initial Compliance Requirements ...
SASSYS pretest analysis of the THORS-SHRS experiments. [LMFBR
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bordner, G.L.; Dunn, F.E.
The THORS Facility at ORNL was recently modified to allow the testing of two parallel 19-pin simulated fueled subassemblies under natural circulation conditions similar to those that might occur during a partial failure of the shutdown heat removal system (SHRS) of a liquid-metal fast breeder reactor. The planned experimental program included a series of tests at various inlet plenum temperatures to determine boiling threshold power levels and the power range for stable boiling during natural circulation operation. Pretest calculations were performed at ANL, which supplement those carried out at ORNL for the purposes of validating the SASSYS model in themore » natural circulation regime and of providing data which would be useful in planning the experiments.« less
40 CFR 52.1770 - Identification of plan.
Code of Federal Regulations, 2012 CFR
2012-07-01
... Particulates from Mica or Feldspar Processing Plants 04/01/03 09/17/03, 68 FR 54362 Sect .0510 Particulates..., approving Paragraph (g) excluding the following language: “excluding startups, shutdowns, maintenance... facilities producing ethanol by natural fermentation under the North American Industry Classification System...
40 CFR 52.1770 - Identification of plan.
Code of Federal Regulations, 2013 CFR
2013-07-01
... Particulates from Mica or Feldspar Processing Plants 04/01/03 09/17/03, 68 FR 54362 Sect .0510 Particulates..., approving Paragraph (g) excluding the following language: “excluding startups, shutdowns, maintenance... facilities producing ethanol by natural fermentation under the North American Industry Classification System...
40 CFR 264.1059 - Standards: Delay of repair.
Code of Federal Regulations, 2013 CFR
2013-07-01
... Section 264.1059 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES... infeasible without a hazardous waste management unit shutdown. In such a case, repair of this equipment shall...
40 CFR 63.6105 - What are my general requirements for complying with this subpart?
Code of Federal Regulations, 2014 CFR
2014-07-01
... limitations which apply to you at all times except during startup, shutdown, and malfunctions. (b) If you must... emissions at all times including during startup, shutdown, and malfunction. Testing and Initial Compliance...
40 CFR 63.6105 - What are my general requirements for complying with this subpart?
Code of Federal Regulations, 2012 CFR
2012-07-01
... limitations which apply to you at all times except during startup, shutdown, and malfunctions. (b) If you must... emissions at all times including during startup, shutdown, and malfunction. Testing and Initial Compliance...
40 CFR 63.6105 - What are my general requirements for complying with this subpart?
Code of Federal Regulations, 2013 CFR
2013-07-01
... limitations which apply to you at all times except during startup, shutdown, and malfunctions. (b) If you must... emissions at all times including during startup, shutdown, and malfunction. Testing and Initial Compliance...
Fast Flux Test Facility thermal and pressure transient events during Cycle 11
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ahrens, D. M.
1992-03-01
This report documents the thermal and pressure transients experienced by the Reactor Heat Transport System (RHTS) during Cycle 11 which included Cycles 11A, 11B-1, 11B-2 and 11C (i.e. 4 startups and 4 shutdowns). Cycle 11 consisted of a refueling period that began on March 14, 1989 and power operation which began on May 3, 1989 and ended on October 27, 1990. Transients resulted from secondary pump starts/stops while at refueling conditions. The major causes of transients at power were five unplanned reactor scrams from 100% power and problems with Loop 2 DHX Fan Controls During 11A.
NASA Astrophysics Data System (ADS)
Saey, P. R. J.; Auer, M.; Becker, A.; Colmanet, S.; Hoffmann, E.; Nikkinen, M.; Schlosser, C.; Sonck, M.
2009-04-01
Atmospheric radioxenon monitoring is a key component of the verification of the Comprehensive Nuclear-Test-Ban Treaty (CTBT). Radiopharmaceutical production facilities (RPF) have recently been identified of emitting the major part of the environmental radioxenon measured at globally distributed monitoring sites deployed to strengthen the radionuclide part of the CTBT verification regime. Efforts to raise a global radioxenon emission inventory revealed that the global total emission from RPF's is 2-3 orders of magnitude higher than the respective emissions related to maintenance of all nuclear power plants (NPP). Given that situation we have seen in 2008 two peculiar hemisphere-specific situations: 1) In the northern hemisphere, a joint shutdown of the global largest four radiopharmaceutical facilities revealed the contribution of the normally 'masked' NPP related emissions. Due to an incident, the Molybdenum production at the "Institut des Radioéléments" (IRE) in Fleurus, Belgium, was shut down between Monday 25 August and 2 December 2008. IRE is the third largest global producer of medical isotopes. In the same period, but for different reasons, the other three worldwide largest producers (CRL in Canada, HFR in The Netherlands and NTP in South Africa) also had scheduled and unscheduled shutdowns. The activity concentrations of 133Xe measured at the Schauinsland Mountain station near Freiburg in Germany (situated 380 km SW of Fleurus) which have a mean of 4.8 mBq/m3 for the period February 2004 - August 2008, went down to 0.87 mBq/m3 for the period September - November 2008. 2) In the southern hemisphere, after a long break, the only radiopharmaceutical facility in Australia started up test production in late November 2008. In the period before the start-up, the background of radioxenon in Australia (Melbourne and Darwin) was below measurable quantities. During six test runs of the renewed RPF at ANSTO in Lucas Heights, up to 6 mBq/m3 of 133Xe were measured in the station at Melbourne, 700 km SW from the facility. This paper confirms the hypothesis that radiopharmaceutical production facilities are the major emitters of radioxenon first of all. Moreover it demonstrates how the temporal shut down of these facilities indicates the scale of their contribution to the European radioxenon background, which decreased 6 fold. Finally we have studied the contribution of the start-up of a renewed RFP to the buildup of a radioxenon background across Australia and the southern hemisphere. Disclaimer The views expressed in this publication are those of the authors and do not necessarily reflect the views of the CTBTO Preparatory Commission or any of the participating institutions.
On February 12, 2013, the U.S. Environmental Protection Agency (EPA) proposed a rule that would ensure states have plans in place that require industrial facilities across the country to follow air pollution rules during SSM operations.
On September 5, 2014, EPA proposed a rule supplementing and revising its February 2013 proposal to ensure states have plans in place that require industrial facilities across the country to follow air pollution rules during SSM operations.
Developing a concept for a national used fuel interim storage facility in the United States
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lewis, Donald Wayne
2013-07-01
In the United States (U.S.) the nuclear waste issue has plagued the nuclear industry for decades. Originally, spent fuel was to be reprocessed but with the threat of nuclear proliferation, spent fuel reprocessing has been eliminated, at least for now. In 1983, the Nuclear Waste Policy Act of 1982 [1] was established, authorizing development of one or more spent fuel and high-level nuclear waste geological repositories and a consolidated national storage facility, called a 'Monitored Retrievable Storage' facility, that could store the spent nuclear fuel until it could be placed into the geological repository. Plans were under way to buildmore » a geological repository, Yucca Mountain, but with the decision by President Obama to terminate the development of Yucca Mountain, a consolidated national storage facility that can store spent fuel for an interim period until a new repository is established has become very important. Since reactor sites have not been able to wait for the government to come up with a storage or disposal location, spent fuel remains in wet or dry storage at each nuclear plant. The purpose of this paper is to present a concept developed to address the DOE's goals stated above. This concept was developed over the past few months by collaboration between the DOE and industry experts that have experience in designing spent nuclear fuel facilities. The paper examines the current spent fuel storage conditions at shutdown reactor sites, operating reactor sites, and the type of storage systems (transportable versus non-transportable, welded or bolted). The concept lays out the basis for a pilot storage facility to house spent fuel from shutdown reactor sites and then how the pilot facility can be enlarged to a larger full scale consolidated interim storage facility. (authors)« less
Foil Bearing Coating Behavior in CO 2
DOE Office of Scientific and Technical Information (OSTI.GOV)
Walker, Matthew; Kruizenga, Alan Michael; Pasch, James Jay
2017-08-01
The Sandia S-CO 2 Recompression Closed Brayton Cycle (RCBC) utilizes a series of gas foil bearings in its turbine-alternator-compressors. At high shaft rotational speed these bearings allow the shaft to ride on a cushion of air. Conversely, during startup and shutdown, the shaft rides along the foil bearing surface. Low-friction coatings are used on bearing surfaces in order to facilitate rotation during these periods. An experimental program was initiated to elucidate the behavior of coated bearing foils in the harsh environments of this system. A test configuration was developed enabling long duration exposure tests, followed by a range of analysesmore » relevant to their performance in a bearing. This report provides a detailed overview of this work. The results contained herein provide valuable information in selecting appropriate coatings for more advanced future bearing-rig tests at the newly established test facility in Sandia-NM.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
LaSalle, F.R.; Golbeg, P.R.; Chenault, D.M.
For reactor and nuclear facilities, both Title 10, Code of Federal Regulations, Part 50, and US Department of Energy Order 6430.1A require assessments of the interaction of non-Safety Class 1 piping and equipment with Safety Class 1 piping and equipment during a seismic event to maintain the safety function. The safety class systems of nuclear reactors or nuclear facilities are designed to the applicable American Society of Mechanical Engineers standards and Seismic Category 1 criteria that require rigorous analysis, construction, and quality assurance. Because non-safety class systems are generally designed to lesser standards and seismic criteria, they may become missilesmore » during a safe shutdown earthquake. The resistance of piping, tubing, and equipment to seismically generated missiles is addressed in the paper. Gross plastic and local penetration failures are considered with applicable test verification. Missile types and seismic zones of influence are discussed. Field qualification data are also developed for missile evaluation.« less
30 CFR 7.103 - Safety system control test.
Code of Federal Regulations, 2014 CFR
2014-07-01
... sensors which will automatically activate the safety shutdown system and stop the engine before the... the temperature sensor in the exhaust gas stream which will automatically activate the safety shutdown... using a wet exhaust conditioner, determine the effectiveness of the temperature sensor in the exhaust...
30 CFR 7.103 - Safety system control test.
Code of Federal Regulations, 2013 CFR
2013-07-01
... sensors which will automatically activate the safety shutdown system and stop the engine before the... the temperature sensor in the exhaust gas stream which will automatically activate the safety shutdown... using a wet exhaust conditioner, determine the effectiveness of the temperature sensor in the exhaust...
30 CFR 7.103 - Safety system control test.
Code of Federal Regulations, 2012 CFR
2012-07-01
... sensors which will automatically activate the safety shutdown system and stop the engine before the... the temperature sensor in the exhaust gas stream which will automatically activate the safety shutdown... using a wet exhaust conditioner, determine the effectiveness of the temperature sensor in the exhaust...
40 CFR 62.15120 - What information must I include in the plant-specific operating manual?
Code of Federal Regulations, 2013 CFR
2013-07-01
... startup, shutdown, and malfunction of the municipal waste combustion unit. (e) Procedures for maintaining... DESIGNATED FACILITIES AND POLLUTANTS Federal Plan Requirements for Small Municipal Waste Combustion Units... the basic combustion principles that apply to municipal waste combustion units. (c) Procedures for...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Medvedev, Pavel G; Ozaltun, Hakan; Robinson, Adam Brady
2014-04-01
Post-irradiation examination of Reduced Enrichment for Research and Test Reactors (RERTR)-12 miniplates showed that in-reactor pillowing occurred in at least 4 plates, rendering performance of these plates unacceptable. To address in-reactor failures, efforts are underway to define the mechanisms responsible for in-reactor pillowing, and to suggest improvements to the fuel plate design and operational conditions. To achieve these objectives, the mechanical response of monolithic fuel to fission and thermally-induced stresses was modeled using a commercial finite element analysis code. Calculations of stresses and deformations in monolithic miniplates during irradiation and after the shutdown revealed that the tensile stress generated inmore » the fuel increased from 2 MPa to 100 MPa at shutdown. The increase in tensile stress at shutdown possibly explains in-reactor pillowing of several RERTR-12 miniplates irradiated to the peak local burnup of up to 1.11x1022 fissions/cm3 . This paper presents the modeling approach and calculation results, and compares results with post-irradiation examinations and mechanical testing of irradiated fuel. The implications for the safe use of the monolithic fuel in research reactors are discussed, including the influence of fuel burnup and power on the magnitude of the shutdown-induced tensile stress.« less
PFBC HGCU Test Facility. Technical progress report No. 24, Third quarter, CY 1995
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
This is the twenty-fourth and final Technical Progress Report submitted to the Department of Energy (DOE) in connection with the cooperative agreement between the DOE and Ohio Power Company for the Tidd PFBC Hot Gas Clean Up Test Facility. This report covers the work completed during the Third Quarter of CY 1995. All activity this quarter was directed toward the completion of the program final report. A draft copy of the final report was forwarded to DOE during this quarter, and DOE submitted their comments on the report to AEPSC. DOE requested that Westinghouse write an appendix to the reportmore » covering the performance of the fail-safe regenerator devices during Tad operation, and Westinghouse subsequently prepared the appendix. Additional DOE comments were incorporated into the report, and it will be issued in camera-ready form by the end of October, 1995, which is the program end date. Appendix 1 presents the results of filter candle posttest examination by Westinghouse performed on selected filter candles following final shutdown of the system.« less
40 CFR 63.7555 - What records must I keep?
Code of Federal Regulations, 2010 CFR
2010-07-01
... (v) related to startup, shutdown, and malfunction. (3) Records of performance tests, fuel analyses... the deviation occurred during a period of startup, shutdown, or malfunction or during another period... monthly fuel use by each boiler or process heater, including the type(s) of fuel and amount(s) used. (2...
40 CFR 63.7555 - What records must I keep?
Code of Federal Regulations, 2012 CFR
2012-07-01
... (v) related to startup, shutdown, and malfunction. (3) Records of performance tests, fuel analyses... the deviation occurred during a period of startup, shutdown, or malfunction or during another period... monthly fuel use by each boiler or process heater, including the type(s) of fuel and amount(s) used. (2...
40 CFR 63.7555 - What records must I keep?
Code of Federal Regulations, 2011 CFR
2011-07-01
... (v) related to startup, shutdown, and malfunction. (3) Records of performance tests, fuel analyses... the deviation occurred during a period of startup, shutdown, or malfunction or during another period... monthly fuel use by each boiler or process heater, including the type(s) of fuel and amount(s) used. (2...
40 CFR 63.1346 - Operating limits for kilns.
Code of Federal Regulations, 2011 CFR
2011-07-01
... not exceeded, except during periods of startup/shutdown when the temperature limit may be exceeded by..., except during periods of startup/shutdown when the temperature limit may be exceeded by no more than 10... performance test, with or without the raw mill operating, is not exceeded, except during periods of startup...
40 CFR 63.1346 - Operating limits for kilns.
Code of Federal Regulations, 2012 CFR
2012-07-01
... not exceeded, except during periods of startup/shutdown when the temperature limit may be exceeded by..., except during periods of startup/shutdown when the temperature limit may be exceeded by no more than 10... performance test, with or without the raw mill operating, is not exceeded, except during periods of startup...
CERN experience and strategy for the maintenance of cryogenic plants and distribution systems
NASA Astrophysics Data System (ADS)
Serio, L.; Bremer, J.; Claudet, S.; Delikaris, D.; Ferlin, G.; Pezzetti, M.; Pirotte, O.; Tavian, L.; Wagner, U.
2015-12-01
CERN operates and maintains the world largest cryogenic infrastructure ranging from ageing installations feeding detectors, test facilities and general services, to the state-of-the-art cryogenic system serving the flagship LHC machine complex. After several years of exploitation of a wide range of cryogenic installations and in particular following the last two years major shutdown to maintain and consolidate the LHC machine, we have analysed and reviewed the maintenance activities to implement an efficient and reliable exploitation of the installations. We report the results, statistics and lessons learned on the maintenance activities performed and in particular the required consolidations and major overhauling, the organization, management and methodologies implemented.
Neutron Source Facility Training Simulator Based on EPICS
DOE Office of Scientific and Technical Information (OSTI.GOV)
Park, Young Soo; Wei, Thomas Y.; Vilim, Richard B.
A plant operator training simulator is developed for training the plant operators as well as for design verification of plant control system (PCS) and plant protection system (PPS) for the Kharkov Institute of Physics and Technology Neutron Source Facility. The simulator provides the operator interface for the whole plant including the sub-critical assembly coolant loop, target coolant loop, secondary coolant loop, and other facility systems. The operator interface is implemented based on Experimental Physics and Industrial Control System (EPICS), which is a comprehensive software development platform for distributed control systems. Since its development at Argonne National Laboratory, it has beenmore » widely adopted in the experimental physics community, e.g. for control of accelerator facilities. This work is the first implementation for a nuclear facility. The main parts of the operator interface are the plant control panel and plant protection panel. The development involved implementation of process variable database, sequence logic, and graphical user interface (GUI) for the PCS and PPS utilizing EPICS and related software tools, e.g. sequencer for sequence logic, and control system studio (CSS-BOY) for graphical use interface. For functional verification of the PCS and PPS, a plant model is interfaced, which is a physics-based model of the facility coolant loops implemented as a numerical computer code. The training simulator is tested and demonstrated its effectiveness in various plant operation sequences, e.g. start-up, shut-down, maintenance, and refueling. It was also tested for verification of the plant protection system under various trip conditions.« less
Preliminary Evaluation of Removing Used Nuclear Fuel from Shutdown Sites
DOE Office of Scientific and Technical Information (OSTI.GOV)
Maheras, Steven J.; Best, Ralph E.; Ross, Steven B.
A preliminary evaluation of removing spent nuclear fuel (SNF) from 13 shutdown nuclear power plant sites was performed. At these shutdown sites the nuclear power reactors have been permanently shut down and the sites have been decommissioned or are undergoing decommissioning. The shutdown sites were Maine Yankee, Yankee Rowe, Connecticut Yankee, Humboldt Bay, Big Rock Point, Rancho Seco, Trojan, La Crosse, Zion, Crystal River, Kewaunee, San Onofre, and Vermont Yankee. The evaluation was divided into four components: Characterization of the SNF and greater-than-Class C low-level radioactive waste (GTCC waste) inventory A description of the on-site infrastructure at the shutdown sitesmore » An evaluation of the near-site transportation infrastructure and transportation experience at the shutdown sites An evaluation of the actions necessary to prepare for and remove SNF and GTCC waste. The primary sources for the inventory of SNF and GTCC waste were the U.S. Department of Energy (DOE) spent nuclear fuel inventory database, industry publications such as StoreFUEL, and government sources such as the U.S. Nuclear Regulatory Commission. The primary sources for information on the conditions of on-site infrastructure and near-site transportation infrastructure and experience included information collected during site visits, information provided by managers at the shutdown sites, Facility Interface Data Sheets compiled for DOE in 2005, Services Planning Documents prepared for DOE in 1993 and 1994, industry publications such as Radwaste Solutions, and Google Earth. State staff, State Regional Group representatives, a Tribal representative, and a Federal Railroad Administration representative have participated in nine of the shutdown site visits. Every shutdown site was found to have at least one off-site transportation mode option for removing its SNF and GTCC waste; some have multiple options. Experience removing large components during reactor decommissioning provided an important source of information used to identify the transportation mode options for the sites. Especially important in conducting the evaluation were site visits, through which information was obtained that would not have been available otherwise. Extensive photographs taken during the site visits proved to be particularly useful in documenting the current conditions at or near the sites. Additional conclusions from this evaluation include: The 13 shutdown sites use designs from 4 different suppliers involving 11 different (horizontal and vertical) dry storage systems that would require the use of 9 different transportation cask designs to remove the SNF and GTCC waste from the shutdown sites. Although some changes to transportation certificates of compliance will be required, the SNF at the initial 9 shutdown sites (Maine Yankee, Yankee Rowe, Connecticut Yankee, Humboldt Bay, Big Rock Point, Rancho Seco, Trojan, La Crosse, and Zion) is in dual purpose dry storage canisters that can be transported, including a small amount of high-burnup fuel. Most sites indicated that 2-3 years of advance time would be required for its preparations before shipments could begin. Some sites could be ready in less time. As additional sites such as Fort Calhoun, Clinton, Quad Cities, Pilgrim, Oyster Creek, and Diablo Canyon shut down, these sites will be included in updates to the evaluation.« less
NASA Astrophysics Data System (ADS)
Smorodin, A. I.; Red'kin, V. V.; Frolov, Y. D.; Korobkov, A. A.; Kemaev, O. V.; Kulik, M. V.; Shabalin, O. V.
2015-07-01
A set of technologies and prototype systems for eco-friendly shutdown of the power-generating, process, capacitive, and transport equipment is offered. The following technologies are regarded as core technologies for the complex: cryogenic technology nitrogen for displacement of hydrogen from the cooling circuit of turbine generators, cryo blasting of the power units by dioxide granules, preservation of the shutdown power units by dehydrated air, and dismantling and severing of equipment and structural materials of power units. Four prototype systems for eco-friendly shutdown of the power units may be built on the basis of selected technologies: Multimode nitrogen cryogenic system with four subsystems, cryo blasting system with CO2 granules for thermal-mechanical and electrical equipment of power units, and compressionless air-drainage systems for drying and storage of the shutdown power units and cryo-gas system for general severing of the steam-turbine power units. Results of the research and pilot and demonstration tests of the operational units of the considered technological systems allow applying the proposed technologies and systems in the prototype systems for shutdown of the power-generating, process, capacitive, and transport equipment.
Posttest analysis of the FFTF inherent safety tests
DOE Office of Scientific and Technical Information (OSTI.GOV)
Padilla, A. Jr.; Claybrook, S.W.
Inherent safety tests were performed during 1986 in the 400-MW (thermal) Fast Flux Test Facility (FFTF) reactor to demonstrate the effectiveness of an inherent shutdown device called the gas expansion module (GEM). The GEM device provided a strong negative reactivity feedback during loss-of-flow conditions by increasing the neutron leakage as a result of an expanding gas bubble. The best-estimate pretest calculations for these tests were performed using the IANUS plant analysis code (Westinghouse Electric Corporation proprietary code) and the MELT/SIEX3 core analysis code. These two codes were also used to perform the required operational safety analyses for the FFTF reactormore » and plant. Although it was intended to also use the SASSYS systems (core and plant) analysis code, the calibration of the SASSYS code for FFTF core and plant analysis was not completed in time to perform pretest analyses. The purpose of this paper is to present the results of the posttest analysis of the 1986 FFTF inherent safety tests using the SASSYS code.« less
Current and prospective safety issues at the HFBR
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tichler, P.R.
The Brookhaven high-flux beam reactor (HFBR) was designed primarily to produce external neutron beams for experimental research. It is cooled, moderated, and reflected by heavy water and uses materials test reactor and engineering test reactor type of fuel elements containing enriched uranium. The reactor power when operation began in 1965 was 40 MW, was raised to 60 MW in 1982 after a number of plant modifications, and operated at that level until 1989. Since that time, safety questions have been raised that resulted in extended shutdowns and a reduction in operating power to 30 MW. This paper discusses the principalmore » safety issues and plans for their resolution and return to 60-MW operation. In addition, radiation embrittlement of the reactor vessel and thermal shield and its effect on the life of the facility are briefly discussed.« less
40 CFR 63.11411 - What General Provisions apply to this subpart?
Code of Federal Regulations, 2010 CFR
2010-07-01
....11410(i).” (3) The process rate for each emissions source subject to an emissions limit in § 63.11409(b... provisions in 40 CFR 63.6(e)(3): “This facility has prepared a startup, shutdown, and malfunction plan in accordance with 40 CFR 63.6(e)(3)”. ...
30 CFR 285.813 - When do I have to report removing equipment from service?
Code of Federal Regulations, 2010 CFR
2010-07-01
... from service? 285.813 Section 285.813 Mineral Resources MINERALS MANAGEMENT SERVICE, DEPARTMENT OF THE... Environmental and Safety Management, Inspections, and Facility Assessments for Activities Conducted Under SAPs, COPs and GAPs Maintenance and Shutdowns § 285.813 When do I have to report removing equipment from...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-23
... income and minority residents near USS-GCW are affected by the air quality resulting from the plant's... ``illusory'' because it is dependent on air data gathered during the plant shutdown that the commenter... facility has a history of air pollution noncompliance. Regardless of EPA's determination of attainment, ABC...
Claus sulfur recovery unit startups
DOE Office of Scientific and Technical Information (OSTI.GOV)
Parnell, D.C.
1973-08-01
Because of the recent emphasis on reducing sulfur emissions to the atmosphere, Claus-type sulfur recovery units are becoming more prevalent throughout the industry. Many plants, including refinery, chemical, and natural gasoline units, are being required to install Claus sulfur recovery facilities to meet pollution requirements. Although Claus units in some cases cannot alone meet the most rigid air pollution codes currently being enforced, they are still the most economical and practical method for recovering about 94 to 97% of the sulfur from hydrogen sulfide rich gases. For best operation and longer service life, proper startup and shutdown procedures for thesemore » sulfur recovery units should be followed. On all startups and shutdowns, these units require considerable operator attention; improper operation during these critical phases can affect overall plant efficiency.« less
Extended Operation of Stirling Convertors at NASA Glenn Research Center
NASA Technical Reports Server (NTRS)
Oriti, Salvatore
2011-01-01
Glenn Research Center (GRC) is supporting life and reliability database for free-piston Stirilng conversion via extended convertor operation Ongoing convertor operation: 18 convertors (4 TDCs from Infinia, 14 ASCs from Sunpower). 350,000 total convertor hours of operation. 218,000 on Infinia units and 132,000 on Sunpower units. Demonstrating steady convertor performance requires precise maintenance of operating conditions. Sources of disruption : Investigative tests: Varying operating frequency, hot-end temp, cold-end temp. Hot end control method: Constant heat input mode requires more user-adjustment than constant temperature mode. Long-term transients in hot end insulation were observed. Support facility: Open-bath circulator fluid concentration drifting. Nuisance shutdowns (instrumentation failure, EMI, power outages). Ambient temperature fluctuations due to room HVAC.
33 CFR 154.812 - Facility requirements for vessel liquid overfill protection.
Code of Federal Regulations, 2011 CFR
2011-07-01
... intrinsically safe cargo tank level sensor system complying with 46 CFR 39.20-9(b) as its only means of overfill... shutdown signal from the cargo tank level sensor system that: (1) Closes the remotely operated cargo vapor...) Electrical continuity of the cargo tank level sensor system is lost; (2) Activates an alarm which is audible...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-26
... various pollution controls in its BART analysis for Big Stone I, its cost impact analysis is skewed in... took into account the State's consideration of environmental impacts when reviewing the Big Stone I SO... shutdown are part of normal operations at facilities like Big Stone, and because these emissions impact...
33 CFR 154.812 - Facility requirements for vessel liquid overfill protection.
Code of Federal Regulations, 2012 CFR
2012-07-01
... intrinsically safe cargo tank level sensor system complying with 46 CFR 39.20-9(b) as its only means of overfill... shutdown signal from the cargo tank level sensor system that: (1) Closes the remotely operated cargo vapor...) Electrical continuity of the cargo tank level sensor system is lost; (2) Activates an alarm which is audible...
33 CFR 154.812 - Facility requirements for vessel liquid overfill protection.
Code of Federal Regulations, 2013 CFR
2013-07-01
... intrinsically safe cargo tank level sensor system complying with 46 CFR 39.20-9(b) as its only means of overfill... shutdown signal from the cargo tank level sensor system that: (1) Closes the remotely operated cargo vapor...) Electrical continuity of the cargo tank level sensor system is lost; (2) Activates an alarm which is audible...
Code of Federal Regulations, 2014 CFR
2014-07-01
... alarm and shutdown shown on the piping and instrumentation diagrams (P&IDs) and reviewed in the hazard... cleaning facility; and that (5) The automatic liquid block valve successfully stops flow of liquid to the... automatically stop the cargo flow to each transfer hose simultaneously, in the event an upset condition occurs...
Leeper, Christine M; Neal, Matthew D; McKenna, Christine; Sperry, Jason L; Gaines, Barbara A
2017-01-01
Abnormalities in fibrinolysis are common and associated with increased mortality in injured adults. While hyperfibrinolysis (HF) and fibrinolysis shutdown (SD) are potential prognostic indicators and treatment targets in adults, these derangements are not well described in a pediatric trauma cohort. This was a prospective analysis of highest level trauma activations in subjects aged 0 to 18 years presenting to our academic center between June 1, 2015, and July 31, 2016, with admission rapid thrombelastograph. Shutdown was defined as LY30 (lysis 30 minutes after the maximum amplitude has been reached) of 0.8% or less and HF defined as LY30 of 3.0% or greater. Variables of interest included demographics, admission vital signs and laboratory values, injuries, incidence of venous thromboembolism under our screening protocol, death, and functional disability (discharge to facility or dependence in functional independence measure category). Youden index determined optimal definition of SD, then Wilcoxon rank-sum, Kruskal-Wallis, and Fisher exact tests were performed. One hundred thirty-three patients are included with median age of 10 years (interquartile range [IQR], 5-13 years); male sex, 5.4%; median Injury Severity Score, 17 (IQR, 10-26); blunt mechanism, 68.4%. Youden analysis defined SD as LY30 of 0.8 or less. In total, 38.3% (n = 51) had SD on admission; 19.6% (n = 26) had HF, and 42.1% (n = 56) were normal. Mortality rate was 9.0% (n = 12), and deep vein thrombosis incidence was 10.7% (n = 13/121 surviving). Shutdown and HF were both associated with mortality (p = 0.014 and p = 0.021) and blood transfusion (p = 0.001 and p < 0.001); SD was also associated with disability (p < 0.001) and deep vein thrombosis (p = 0.002). Blunt mechanism was associated with SD, and penetrating mechanism was associated with HF (p = 0.011). Both SD (p = 0.001) and HF (p = 0.036) were associated with elevated international normalized ratio. LY30 did not differ significantly across age groups. Children demonstrate high rates of inhibition (SD) and overactivation (HF) of fibrinolysis after injury. Shutdown and HF are both associated with poor outcomes. Shutdown is a particularly poor prognostic indicator, accounting for the greatest percentage of death, disability, and patients requiring transfusion, as well as later development of hypercoagulable state. The addition of thrombelastograph to pediatric trauma care protocols should be considered as it contributes important prognostic and clinical information. Prognostic and epidemiologic study, level III.
Simulation of Cold Flow in a Truncated Ideal Nozzle with Film Cooling
NASA Technical Reports Server (NTRS)
Braman, K. E.; Ruf, J. H.
2015-01-01
Flow transients during rocket start-up and shut-down can lead to significant side loads on rocket nozzles. The capability to estimate these side loads computationally can streamline the nozzle design process. Towards this goal, the flow in a truncated ideal contour (TIC) nozzle has been simulated using RANS and URANS for a range of nozzle pressure ratios (NPRs) aimed to match a series of cold flow experiments performed at the NASA MSFC Nozzle Test Facility. These simulations were performed with varying turbulence model choices and for four approximations of the supersonic film injection geometry, each of which was created with a different simplification of the test article geometry. The results show that although a reasonable match to experiment can be obtained with varying levels of geometric fidelity, the modeling choices made do not fully represent the physics of flow separation in a TIC nozzle with film cooling.
RICH upgrade in LHCb experiment
NASA Astrophysics Data System (ADS)
Pistone, A.; LHCb RICH Collaboration
2017-01-01
The LHCb experiment is dedicated to precision measurements of CP violation and rare decays of B hadrons at the Large Hadron Collider (LHC) at CERN (Geneva). The second long shutdown of the LHC is currently scheduled to begin in 2019. During this period the LHCb experiment with all its sub-detectors will be upgraded in order to run at an instantaneous luminosity of 2 × 10^{33} cm ^{-2} s ^{-1} , about a factor 5 higher than the current luminosity, and to read out data at a rate of 40MHz into a flexible software-based trigger. The Ring Imaging CHerenkov (RICH) system will require new photon detectors and modifications to the optics of the upstream detector. Tests of the prototype of the smallest constituent of the new RICH system have been performed during testbeam sessions at the North Area test beam facility at CERN in the last years.
Shutdown characteristics of the Mod-O wind turbine with aileron controls
NASA Technical Reports Server (NTRS)
Miller, D. R.; Corrigan, R. D.
1984-01-01
Horizontal-axis wind turbines utilize partial or full variable blade pitch to regulate rotor speed. The weight and costs of these systems indicated a need for alternate methods of rotor control. Aileron control is an alternative which has potential to meet this need. The NASA Lewis Research Center has been experimentally testing aileron control rotors on the Mod-U wind turbine to determine their power regulation and shutdown characteristics. Experimental and analytical shutdown test results are presented for a 38 percent chord aileron-control rotor. These results indicated that the 38 percent chord ailerons provided overspeed protection over the entire Mod-O operational windspeed range, and had a no-load equilibrium tip speed ratio of 1.9. Thus, the 38 percent chord ailerons had much improved aerodynamic braking capability when compared with the first aileron-control rotor having 20 percent chord ailerons.
ERIC Educational Resources Information Center
Petrasek, Al, Jr.
This guide describes the standard operating job procedures for the tertiary chemical treatment - lime precipitation process of wastewater treatment plants. Step-by-step instructions are given for pre-start up, start-up, continuous operation, and shut-down procedures. In addition, some theoretical material is presented along with some relevant…
ERIC Educational Resources Information Center
Deal, Gerald A.; Montgomery, James A.
This guide describes standard operating job procedures for the grit removal process of wastewater treatment plants. Step-by-step instructions are given for pre-start up inspection, start-up, continuous operation, and shut-down procedures. A description of the equipment used in the process is given. Some theoretical material is presented. (BB)
The Air Force Nuclear Engineering Center Structural Activation and Integrity Evaluation
1990-03-01
Vi1 List of Figures Figure Page 1. Inside Piqua Nuclear Power Facility containment building on top of the entombed reactor core ... 5...5. Predicted activity percentage of individual materials in the AFNEC ..... ........................ 21 6. Predicted radioisotope activity percentage...of total radioisotopic inventory within entombment at 20 years after shutdown ......................... 23 iv List of Tables Table Page 1. ORIGEN2
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-07
... following the earthquake and shutdown of the operating units, however, the first large tsunami wave inundated the site, followed by additional waves. The tsunami caused extensive damage to site facilities and..., and after some period of time at the other units. Unit 6 retained the function of one air-cooled EDG...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-15
... following the earthquake and shutdown of the operating units, however, the first large tsunami wave inundated the site, followed by additional waves. The tsunami caused extensive damage to site facilities and..., and after some period of time at the other units. Unit 6 retained the function of one air-cooled EDG...
Fluctuating Pressure Analysis of a 2-D SSME Nozzle Air Flow Test
NASA Technical Reports Server (NTRS)
Reed, Darren; Hidalgo, Homero
1996-01-01
To better understand the Space Shuttle Main Engine (SSME) startup/shutdown tansients, an airflow test of a two dimensional nozzle was conducted at Marshall Space Flight Center's trisonic wind tunnel. Photographic and other instrumentation show during an SSME start large nozzle shell distortions occur as the Mach disk is passing through the nozzle. During earlier develop of the SSME, this startup transient resulted in low cycle fatigue failure of one of the LH2 feedlines. The two dimensional SSME nozzle test was designed to measure the static and fluctuating pressure environment and color Schlieren video during the startup and shutdown phases of the run profile.
The shutdown reactor: Optimizing spent fuel storage cost
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pennington, C.W.
1995-12-31
Several studies have indicated that the most prudent way to store fuel at a shutdown reactor site safely and economically is through the use of a dry storage facility licensed under 10CFR72. While such storage is certainly safe, is it true that the dry ISFSI represents the safest and most economical approach for the utility? While no one is really able to answer that question definitely, as yet, Holtec has studied this issue for some time and believes that both an economic and safety case can be made for an optimization strategy that calls for the use of both wetmore » and dry ISFSI storage of spent fuel at some plants. For the sake of brevity, this paper summarizes some of Holtec`s findings with respect to the economics of maintaining some fuel in wet storage at a shutdown reactor. The safety issue, or more importantly the perception of safety of spent fuel in wet storage, still varies too much with the eye of the beholder, and until a more rigorous presentation of safety analyses can be made in a regulatory setting, it is not practically useful to argue about how many angels can sit on the head of a safety-related pin. Holtec is prepared to present such analyses, but this does not appear to be the proper venue. Thus, this paper simply looks at certain economic elements of a wet ISFSI at a shutdown reactor to make a prima facie case that wet storage has some attractiveness at a shutdown reactor and should not be rejected out of hand. Indeed, an optimization study at certain plants may well show the economic vitality of keeping some fuel in the pool and converting the NRC licensing coverage from 10CFR50 to 10CFR72. If the economics look attractive, then the safety issue may be confronted with a compelling interest.« less
ERIC Educational Resources Information Center
Perley, Gordon F.
This is a guide for standard operating job procedures for the pump station process of wastewater treatment plants. Step-by-step instructions are given for pre-start up inspection, start-up procedures, continuous routine operation procedures, and shut-down procedures. A general description of the equipment used in the process is given. Two…
DOE Office of Scientific and Technical Information (OSTI.GOV)
HOPKINS, A.M.
The Hanford site is subject to the Hanford Federal Facility Agreement and Consent Order (HFFACO), an order on consent signed by the DOE, the U. S. Environmental Protection Agency, (EPA) and the Washington Department of Ecology (WDOE). Under the HFFCCO, negotiations for transition milestones begin within six months after the issuance of a shutdown order. In the case of the PFP, the Nuclear Materials disposition and stabilization activities, a DOE responsibility, were necessary as precursor activities to Transition. This situation precipitated a crisis in the negotiations between the agencies, and formal negotiations initiated in 1997 ended in failure. The negotiationsmore » reached impasse on several key regulatory and operational issues. The 1997 negotiation was characterized by a strongly positional style. DOE and the regulatory personnel took hard lines early in the negotiations and were unable to move to resolution of key issues after a year and a half. This resulted in unhappy stakeholders, poor publicity, and work delays as well as wounded relationships between DOE and the regulatory community. The PFP is a former plutonium metal production facility. The operating mission of the PFP ended with a DOE Headquarters shutdown letter in October of 1996. Generally, the receipt of a shutdown letter initiates the start of Transition (as the first step of Decommissioning) of a facility. In the 2000-2001 PFP negotiations, a completely different approach was suggested and eventually initiated: Collaborative or Relational Negotiations. The relational negotiation style resulted in agreement between the agencies on all key issues within 6 months of initiation. All parties were very pleased with the results and all parties were relieved that protracted negotiations sessions were not needed with the new style of working together collaboratively to serve each other's interests without compromising each party's needs. The characteristics of collaborative negotiations included building trust, emphasizing equality of team members, problem solving by the entire team, relying on individual communications, and self-management skills. A specific example of positional negotiations is given with the resultant increase in cost, duration of negotiations, and lingering questions regarding trust among the parties.« less
NASA Astrophysics Data System (ADS)
Li, Yajie; Pu, Hongting
2018-04-01
Polypropylene (PP)/polyethylene (PE) multilayer separators with cellular-like submicron pore structure for lithium-ion battery are efficiently fabricated by the combination of multilayer coextrusion (MC) and thermal induced phase separation (TIPS). The as-prepared separators, referred to as MC-TIPS PP/PE, not only show efficacious thermal shutdown function and wider shutdown temperature window, but also exhibit higher thermal stability than the commercial separator with trilayer construction of PP and PE (Celgard® 2325). The dimensional shrinkage of MC-TIPS PP/PE can be negligible until 160 °C. In addition, compared to the commercial separator, MC-TIPS PP/PE exhibits higher porosity and electrolyte uptake, leading to higher ionic conductivity and better battery performances. The above-mentioned fascinating characteristics with the convenient preparation process make MC-TIPS PP/PE a promising candidate for the application as high performance lithium-ion battery separators.
Fuel cell system logic for differentiating between rapid and normal shutdown commands
Keskula, Donald H.; Doan, Tien M.; Clingerman, Bruce J.
2000-01-01
A method of controlling the operation of a fuel cell system wherein each shutdown command for the system is subjected to decision logic which determines whether the command should be a normal shutdown command or rapid shutdown command. If the logic determines that the shutdown command should be a normal shutdown command, then the system is shutdown in a normal step-by-step process in which the hydrogen stream is consumed within the system. If the logic determines that the shutdown command should be a rapid shutdown command, the hydrogen stream is removed from the system either by dumping to atmosphere or routing to storage.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Soldaini, Michel
The first heading of your manuscript must be 'Introduction'. Phenix is the only remaining French fast breeder reactor after the shutdown of Superphenix (1999) and Rapsodie (1983). Phenix is located inside the Marcoule nuclear site along the Rhone river near Bagnols-sur-Ceze in southeastern France. Phenix is one of the facilities belonging the French Atomic Energy Commission (CEA) on the Marcoule site. It is a fast breeder reactor (FBR) developed at the end of the 1960's. that has been in operation since 1973 and was connected to the power grid in 1974. It is a second generation prototype developed while themore » first generation FBR, Rapsodie, was still in operation. Phenix is a 250 electrical MW power plant. During the first 20 years of operation, its main aim was to demonstrate the viability of sodium-cooled FBRs. Since the 1991 radioactive waste management act, Phenix has become an irradiation tool for the actinide transmutation program. To extend its operating life for 6 additional cycles, it was necessary to refurbish the plant; this involved major work performed from 1999 to 2003 at a total cost of about 250 M??. Today, with a realistic expectation, the final shutdown is planned for the beginning of 2009. The main objective of the Phenix dismantling project is to eliminate all the process equipment and clean all the building to remove all the radioactive zones. To reach this objective, three main hazards must be eliminated: Fuel (criticality hazard), Sodium, Radioactive equipment. The complexity of decommissioning a facility such as Phenix is increased by: - the lack of storage facility for high radioactive material, - the decision to treat all the radioactive sodium and sodium waste inside the plant, - the very high irradiation of the core structures due to the presence of cobalt alloys. On the other hand, Phenix plant is still under operating with a qualified staff and the radioactivity coming from structural activation is well known. After the final shutdown, the first operations will be conducted by the same staff under the same safety report. Another interesting fact is that the decommissioning funds project exist and are available. The CEA decided to begin the dismantling phase without waiting because after a period of decay it is not really cheaper or easier to work. This approach needs interim storage facilities not long after the final shutdown. For the low- and intermediate-level radioactive waste there are national storage centers but for the high-level wastes, each operator must manage its waste until a suitable disposal site is available. At Marcoule a new storage facility is now being designed and scheduled to begin operating after 2013-2014. After removal of the fuel and core elements, the primary sodium will be drained and eliminated by a carbonation process. To ensure biological shielding, the reference scenario calls for filling the primary vessel with water. The most radioactive structures (dia-grid and core support) will be cut up with remote tools, after which the rest of the structure will be cut up manually. Phenix contains about 1450 metric tons of sodium. The CEA initially planned to build ATENA, a new facility for all radioactive sodium waste from R and D and FBR facilities. For various reasons, but mainly to save money, the CEA decided to treat all radioactive sodium and sodium waste in the framework of the Phenix dismantling project. There are no real difficulties in the dismantling schedule because of the advanced state of development of the processes selected for the ATENA project. Because of the knowledge already obtained, the issues concern project management, waste management and human resources reduction more than technical 0014challe.« less
US Navy incurs ongoing asbestos removal costs
DOE Office of Scientific and Technical Information (OSTI.GOV)
Barber, J.
1983-07-04
Asbestos insulation removal from the Philadelphia Naval Shipyard and a Coast Guard facility at Fort Totten, Queens could cost the Navy over $400 million by the time all asbestos hazards are identified and removed. Much of the cost is due to equipment shutdown during the process and the handling and disposal of asbestos material. Concern over health hazards from exposure to asbestos and recent lawsuits claiming damage prompted the removal. (DCK)
We must reach out to the public
NASA Astrophysics Data System (ADS)
Perfit, Michael; Fornari, Daniel J.
Faced with the current budget crisis, legislators and leaders of federal agencies are asking scientists to communicate why continued and even expanded funding of basic sciences is important to America. There have been repeated requests for oceanographers to communicate the importance of their science to the public at large and to legislators at both state and federal levels. It is often difficult, however, to find opportunities for public and legislative outreach.On March 17, 1996, Neal Lane, Director of the National Science Foundation, and Jerry Lewis (R.-Calif.), Chair of the House Appropriations Subcommittee for VA, HUD, and Independent Agencies, which oversees NSF, participated in a dive off the coast of California in the Deep Submergence Vehicle (DSV) Alvin. The dive was part an ongoing effort to improve science and operational systems on Alvin and to ensure that the submersible systems are ready for the next science program. It followed a 3-month shutdown of the facility imposed, in part, by budget cutbacks. The engineering dives are funded by the National Science Foundation, The U.S. Navy Office of Naval Research, and the National Oceanic and Atmospheric Administration through the Woods Hole Oceanographic Institution, the facility operator. In addition to testing out a new, integrated navigation software package for DSV operations, several vehicle systems and a new digital imaging system were tested.
40 CFR 63.7520 - What performance tests and procedures must I use?
Code of Federal Regulations, 2010 CFR
2010-07-01
... load while burning the type of fuel or mixture of fuels that have the highest content of chlorine... performance test. (e) You may not conduct performance tests during periods of startup, shutdown, or...
40 CFR 63.7520 - What performance tests and procedures must I use?
Code of Federal Regulations, 2012 CFR
2012-07-01
... load while burning the type of fuel or mixture of fuels that have the highest content of chlorine... performance test. (e) You may not conduct performance tests during periods of startup, shutdown, or...
40 CFR 63.7520 - What performance tests and procedures must I use?
Code of Federal Regulations, 2011 CFR
2011-07-01
... load while burning the type of fuel or mixture of fuels that have the highest content of chlorine... performance test. (e) You may not conduct performance tests during periods of startup, shutdown, or...
40 CFR Appendix 1 to Part 3 - Priority Reports
Code of Federal Regulations, 2013 CFR
2013-07-01
...). Hazardous Air Pollutants Compliance Report Reports containing results from performance test, opacity tests, and visible emissions tests. Progress reports; periodic and immediate startup, shutdown, and... Owners report emissions data from stationary sources 51.211. Report For Initial Performance Test Report...
40 CFR Appendix 1 to Part 3 - Priority Reports
Code of Federal Regulations, 2014 CFR
2014-07-01
...). Hazardous Air Pollutants Compliance Report Reports containing results from performance test, opacity tests, and visible emissions tests. Progress reports; periodic and immediate startup, shutdown, and... Owners report emissions data from stationary sources 51.211. Report For Initial Performance Test Report...
Water NSTF Design, Instrumentation, and Test Planning
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lisowski, Darius D.; Gerardi, Craig D.; Hu, Rui
The following report serves as a formal introduction to the water-based Natural convection Shutdown heat removal Test Facility (NSTF) program at Argonne. Since 2005, this US Department of Energy (DOE) sponsored program has conducted large scale experimental testing to generate high-quality and traceable validation data for guiding design decisions of the Reactor Cavity Cooling System (RCCS) concept for advanced reactor designs. The most recent facility iteration, and focus of this report, is the operation of a 1/2 scale model of a water-RCCS concept. Several features of the NSTF prototype align with the conceptual design that has been publicly released formore » the AREVA 625 MWt SC-HTGR. The design of the NSTF also retains all aspects common to a fundamental boiling water thermosiphon, and thus is well poised to provide necessary experimental data to advance basic understanding of natural circulation phenomena and contribute to computer code validation. Overall, the NSTF program operates to support the DOE vision of aiding US vendors in design choices of future reactor concepts, advancing the maturity of codes for licensing, and ultimately developing safe and reliable reactor technologies. In this report, the top-level program objectives, testing requirements, and unique considerations for the water cooled test assembly are discussed, and presented in sufficient depth to support defining the program’s overall scope and purpose. A discussion of the proposed 6-year testing program is then introduced, which outlines the specific strategy and testing plan for facility operations. The proposed testing plan has been developed to meet the toplevel objective of conducting high-quality test operations that span across a broad range of single- and two-phase operating conditions. Details of characterization, baseline test cases, accident scenario, and parametric variations are provided, including discussions of later-stage test cases that examine the influence of geometric variations and off-normal configurations. The facility design follows, including as-built dimensions and specifications of the various mechanical and liquid systems, design choices for the test section, water storage tank, and network piping. Specifications of the instrumentation suite are then presented, along with specific information on performance windows, measurement uncertainties, and installation locations. Finally, descriptions of the control systems and heat removal networks are provided, which have been engineered to support precise quantification of energy balances and facilitate well-controlled test operations.« less
NASA Technical Reports Server (NTRS)
Carpenter, Joyce E.; Gentry, Gregory J.; Diderich, Greg S.; Roy, Robert J.; Golden, John L.; VanKeuren, Steve; Steele, John W.; Rector, Tony J.; Varsik, Jerome D.; Montefusco, Daniel J.;
2012-01-01
The Oxygen Generation System (OGS) Hydrogen Dome Assembly Orbital Replacement Unit (ORU) serial number 00001 suffered a cell stack high-voltage shutdown on July 5, 2010. The Hydrogen Dome Assembly ORU was removed and replaced with the on-board spare ORU serial number 00002 to maintain OGS operation. The Hydrogen Dome Assembly ORU was returned from ISS on STS-133/ULF-5 in March 2011 with test, teardown and evaluation (TT&E) and failure analysis to follow.
DOE Office of Scientific and Technical Information (OSTI.GOV)
G. L. Sharp; R. T. McCracken
The Advanced Test Reactor (ATR) is a pressurized light-water reactor with a design thermal power of 250 MW. The principal function of the ATR is to provide a high neutron flux for testing reactor fuels and other materials. The reactor also provides other irradiation services such as radioisotope production. The ATR and its support facilities are located at the Test Reactor Area of the Idaho National Engineering and Environmental Laboratory (INEEL). An audit conducted by the Department of Energy's Office of Independent Oversight and Performance Assurance (DOE OA) raised concerns that design conditions at the ATR were not adequately analyzedmore » in the safety analysis and that legacy design basis management practices had the potential to further impact safe operation of the facility.1 The concerns identified by the audit team, and issues raised during additional reviews performed by ATR safety analysts, were evaluated through the unreviewed safety question process resulting in shutdown of the ATR for more than three months while these concerns were resolved. Past management of the ATR safety basis, relative to facility design basis management and change control, led to concerns that discrepancies in the safety basis may have developed. Although not required by DOE orders or regulations, not performing design basis verification in conjunction with development of the 10 CFR 830 Subpart B upgraded safety basis allowed these potential weaknesses to be carried forward. Configuration management and a clear definition of the existing facility design basis have a direct relation to developing and maintaining a high quality safety basis which properly identifies and mitigates all hazards and postulated accident conditions. These relations and the impact of past safety basis management practices have been reviewed in order to identify lessons learned from the safety basis upgrade process and appropriate actions to resolve possible concerns with respect to the current ATR safety basis. The need for a design basis reconstitution program for the ATR has been identified along with the use of sound configuration management principles in order to support safe and efficient facility operation.« less
Simulation of the neutron flux in the irradiation facility at RA-3 reactor.
Bortolussi, S; Pinto, J M; Thorp, S I; Farias, R O; Soto, M S; Sztejnberg, M; Pozzi, E C C; Gonzalez, S J; Gadan, M A; Bellino, A N; Quintana, J; Altieri, S; Miller, M
2011-12-01
A facility for the irradiation of a section of patients' explanted liver and lung was constructed at RA-3 reactor, Comisión Nacional de Energía Atómica, Argentina. The facility, located in the thermal column, is characterized by the possibility to insert and extract samples without the need to shutdown the reactor. In order to reach the best levels of security and efficacy of the treatment, it is necessary to perform an accurate dosimetry. The possibility to simulate neutron flux and absorbed dose in the explanted organs, together with the experimental dosimetry, allows setting more precise and effective treatment plans. To this end, a computational model of the entire reactor was set-up, and the simulations were validated with the experimental measurements performed in the facility. Copyright © 2011 Elsevier Ltd. All rights reserved.
Systems and methods for harvesting and storing materials produced in a nuclear reactor
Heinold, Mark R.; Dayal, Yogeshwar; Brittingham, Martin W.
2016-04-05
Systems produce desired isotopes through irradiation in nuclear reactor instrumentation tubes and deposit the same in a robust facility for immediate shipping, handling, and/or consumption. Irradiation targets are inserted and removed through inaccessible areas without plant shutdown and placed in the harvesting facility, such as a plurality of sealable and shipping-safe casks and/or canisters. Systems may connect various structures in a sealed manner to avoid release of dangerous or unwanted matter throughout the nuclear plant, and/or systems may also automatically decontaminate materials to be released. Useable casks or canisters can include plural barriers for containment that are temporarily and selectively removable with specially-configured paths inserted therein. Penetrations in the facilities may limit waste or pneumatic gas escape and allow the same to be removed from the systems without over-pressurization or leakage. Methods include processing irradiation targets through such systems and securely delivering them in such harvesting facilities.
40 CFR 63.1111 - Startup, shutdown, and malfunction.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 11 2013-07-01 2013-07-01 false Startup, shutdown, and malfunction. 63... Control Technology Standards § 63.1111 Startup, shutdown, and malfunction. (a) Startup, shutdown, and... develop a written startup, shutdown, and malfunction plan that describes, in detail, procedures for...
40 CFR 63.1111 - Startup, shutdown, and malfunction.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 11 2014-07-01 2014-07-01 false Startup, shutdown, and malfunction. 63... Control Technology Standards § 63.1111 Startup, shutdown, and malfunction. (a) Startup, shutdown, and... develop a written startup, shutdown, and malfunction plan that describes, in detail, procedures for...
40 CFR 63.1111 - Startup, shutdown, and malfunction.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 11 2012-07-01 2012-07-01 false Startup, shutdown, and malfunction. 63... Control Technology Standards § 63.1111 Startup, shutdown, and malfunction. (a) Startup, shutdown, and... develop a written startup, shutdown, and malfunction plan that describes, in detail, procedures for...
40 CFR 63.1111 - Startup, shutdown, and malfunction.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 10 2011-07-01 2011-07-01 false Startup, shutdown, and malfunction. 63... Control Technology Standards § 63.1111 Startup, shutdown, and malfunction. (a) Startup, shutdown, and... develop a written startup, shutdown, and malfunction plan that describes, in detail, procedures for...
Exhaust gas treatment in testing nuclear rocket engines
NASA Astrophysics Data System (ADS)
Zweig, Herbert R.; Fischler, Stanley; Wagner, William R.
1993-01-01
With the exception of the last test series of the Rover program, Nuclear Furnace 1, test-reactor and rocket engine hydrogen gas exhaust generated during the Rover/NERVA program was released directly to the atmosphere, without removal of the associated fission products and other radioactive debris. Current rules for nuclear facilities (DOE Order 5480.6) are far more protective of the general environment; even with the remoteness of the Nevada Test Site, introduction of potentially hazardous quantities of radioactive waste into the atmosphere must be scrupulously avoided. The Rocketdyne treatment concept features a diffuser to provide altitude simulation and pressure recovery, a series of heat exchangers to gradually cool the exhaust gas stream to 100 K, and an activated charcoal bed for adsorption of inert gases. A hydrogen-gas fed ejector provides auxiliary pumping for startup and shutdown of the engine. Supplemental filtration to remove particulates and condensed phases may be added at appropriate locations in the system. The clean hydrogen may be exhausted to the atmosphere and flared, or the gas may be condensed and stored for reuse in testing. The latter approach totally isolates the working gas from the environment.
Flow Quality Measurements in the NASA Ames Upgraded 11-by 11-Foot Transonic Wind Tunnel
NASA Technical Reports Server (NTRS)
Amaya, Max A.; Murthy, Sreedhara V.; George, M. W. (Technical Monitor)
2000-01-01
Among the many upgrades designed and implemented in the NASA Ames 11-by 11-Foot Transonic Wind Tunnel over the past few years, several directly affect flow quality in the test section: a turbulence reduction system with a honeycomb and two screens, a flow smoothing system in the back leg diffusers, an improved drive motor control system, and a full replacement set of composite blades for the compressor. Prior to the shut-down of the tunnel for construction activities, an 8-foot span rake populated with flow instrumentation was traversed in the test section to fully document the flow quality and establish a baseline against which the upgrades could be characterized. A similar set of measurements was performed during the recent integrated system test trials, but the scope was somewhat limited in accordance with the primary objective of such tests, namely to return the tunnel to a fully operational status. These measurements clearly revealed substantial improvements in flow angularity and significant reductions in turbulence level for both full-span and semi-span testing configurations, thus making the flow quality of the tunnel one of the best among existing transonic facilities.
Flight-Tested Prototype of BEAM Software
NASA Technical Reports Server (NTRS)
Mackey, Ryan; Tikidjian, Raffi; James, Mark; Wang, David
2006-01-01
Researchers at JPL have completed a software prototype of BEAM (Beacon-based Exception Analysis for Multi-missions) and successfully tested its operation in flight onboard a NASA research aircraft. BEAM (see NASA Tech Briefs, Vol. 26, No. 9; and Vol. 27, No. 3) is an ISHM (Integrated Systems Health Management) technology that automatically analyzes sensor data and classifies system behavior as either nominal or anomalous, and further characterizes anomalies according to strength, duration, and affected signals. BEAM (see figure) can be used to monitor a wide variety of physical systems and sensor types in real time. In this series of tests, BEAM monitored the engines of a Dryden Flight Research Center F-18 aircraft, and performed onboard, unattended analysis of 26 engine sensors from engine startup to shutdown. The BEAM algorithm can detect anomalies based solely on the sensor data, which includes but is not limited to sensor failure, performance degradation, incorrect operation such as unplanned engine shutdown or flameout in this example, and major system faults. BEAM was tested on an F-18 simulator, static engine tests, and 25 individual flights totaling approximately 60 hours of flight time. During these tests, BEAM successfully identified planned anomalies (in-flight shutdowns of one engine) as well as minor unplanned anomalies (e.g., transient oil- and fuel-pressure drops), with no false alarms or suspected false-negative results for the period tested. BEAM also detected previously unknown behavior in the F- 18 compressor section during several flights. This result, confirmed by direct analysis of the raw data, serves as a significant test of BEAM's capability.
Renovation of the hot press in the Plutonium Experimental Facility
DOE Office of Scientific and Technical Information (OSTI.GOV)
Congdon, J.W.; Nelson, G.H.
1990-03-05
The Plutonium Experimental Facility (PEF) will be used to develop a new fuel pellet fabrication process and to evaluate equipment upgrades. The facility was used from 1978 until 1982 to optimize the parameters for fuel pellet production using a process which was developed at Los Alamos National Laboratory. The PEF was shutdown and essentially abandoned until mid-1987 when the facility renovations were initiated by the Actinide Technology Section (ATS) of SRL. A major portion of the renovation work was related to the restart of the hot press system. This report describes the renovations and modifications which were required to restartmore » the PEF hot press. The primary purpose of documenting this work is to help provide a basis for Separations to determine the best method of renovating the hot press in the Plutonium Fuel Fabrication (PuFF) facility. This report also includes several SRL recommendations concerning the renovation and modification of the PuFF hot press. 4 refs.« less
Code of Federal Regulations, 2013 CFR
2013-07-01
... requirements during periods of startup, shutdown, and malfunction? 62.15150 Section 62.15150 Protection of... § 62.15150 What happens to the operating requirements during periods of startup, shutdown, and... municipal waste combustion unit startup, shutdown, or malfunction. (b) Each startup, shutdown, or...
Code of Federal Regulations, 2014 CFR
2014-07-01
... during periods of startup, shutdown, and malfunction? 60.1220 Section 60.1220 Protection of Environment... Emission Limits § 60.1220 What happens to the emission limits during periods of startup, shutdown, and... waste combustion unit startup, shutdown, or malfunction. (b) Each startup, shutdown, or malfunction must...
Code of Federal Regulations, 2011 CFR
2011-07-01
... during periods of startup, shutdown, and malfunction? 60.1220 Section 60.1220 Protection of Environment... Emission Limits § 60.1220 What happens to the emission limits during periods of startup, shutdown, and... waste combustion unit startup, shutdown, or malfunction. (b) Each startup, shutdown, or malfunction must...
Code of Federal Regulations, 2012 CFR
2012-07-01
... during periods of startup, shutdown, and malfunction? 60.1220 Section 60.1220 Protection of Environment... Emission Limits § 60.1220 What happens to the emission limits during periods of startup, shutdown, and... waste combustion unit startup, shutdown, or malfunction. (b) Each startup, shutdown, or malfunction must...
Code of Federal Regulations, 2012 CFR
2012-07-01
... requirements during periods of startup, shutdown, and malfunction? 62.15150 Section 62.15150 Protection of... § 62.15150 What happens to the operating requirements during periods of startup, shutdown, and... municipal waste combustion unit startup, shutdown, or malfunction. (b) Each startup, shutdown, or...
Code of Federal Regulations, 2013 CFR
2013-07-01
... during periods of startup, shutdown, and malfunction? 60.1220 Section 60.1220 Protection of Environment... Emission Limits § 60.1220 What happens to the emission limits during periods of startup, shutdown, and... waste combustion unit startup, shutdown, or malfunction. (b) Each startup, shutdown, or malfunction must...
Code of Federal Regulations, 2012 CFR
2012-07-01
... requirements during periods of startup, shutdown, and malfunction? 60.1695 Section 60.1695 Protection of... Requirements § 60.1695 What happens to the operating requirements during periods of startup, shutdown, and... municipal waste combustion unit startup, shutdown, or malfunction. (b) Each startup, shutdown, or...
Code of Federal Regulations, 2011 CFR
2011-07-01
... requirements during periods of startup, shutdown, and malfunction? 62.15150 Section 62.15150 Protection of... § 62.15150 What happens to the operating requirements during periods of startup, shutdown, and... municipal waste combustion unit startup, shutdown, or malfunction. (b) Each startup, shutdown, or...
Code of Federal Regulations, 2010 CFR
2010-07-01
... requirements during periods of startup, shutdown, and malfunction? 62.15150 Section 62.15150 Protection of... § 62.15150 What happens to the operating requirements during periods of startup, shutdown, and... municipal waste combustion unit startup, shutdown, or malfunction. (b) Each startup, shutdown, or...
Code of Federal Regulations, 2011 CFR
2011-07-01
... requirements during periods of startup, shutdown, and malfunction? 60.1695 Section 60.1695 Protection of... Requirements § 60.1695 What happens to the operating requirements during periods of startup, shutdown, and... municipal waste combustion unit startup, shutdown, or malfunction. (b) Each startup, shutdown, or...
Code of Federal Regulations, 2010 CFR
2010-07-01
... during periods of startup, shutdown, and malfunction? 60.1220 Section 60.1220 Protection of Environment... Emission Limits § 60.1220 What happens to the emission limits during periods of startup, shutdown, and... waste combustion unit startup, shutdown, or malfunction. (b) Each startup, shutdown, or malfunction must...
Code of Federal Regulations, 2014 CFR
2014-07-01
... requirements during periods of startup, shutdown, and malfunction? 60.1695 Section 60.1695 Protection of... Requirements § 60.1695 What happens to the operating requirements during periods of startup, shutdown, and... municipal waste combustion unit startup, shutdown, or malfunction. (b) Each startup, shutdown, or...
Code of Federal Regulations, 2010 CFR
2010-07-01
... requirements during periods of startup, shutdown, and malfunction? 60.1695 Section 60.1695 Protection of... Requirements § 60.1695 What happens to the operating requirements during periods of startup, shutdown, and... municipal waste combustion unit startup, shutdown, or malfunction. (b) Each startup, shutdown, or...
Code of Federal Regulations, 2014 CFR
2014-07-01
... requirements during periods of startup, shutdown, and malfunction? 62.15150 Section 62.15150 Protection of... § 62.15150 What happens to the operating requirements during periods of startup, shutdown, and... municipal waste combustion unit startup, shutdown, or malfunction. (b) Each startup, shutdown, or...
Code of Federal Regulations, 2013 CFR
2013-07-01
... requirements during periods of startup, shutdown, and malfunction? 60.1695 Section 60.1695 Protection of... Requirements § 60.1695 What happens to the operating requirements during periods of startup, shutdown, and... municipal waste combustion unit startup, shutdown, or malfunction. (b) Each startup, shutdown, or...
NASA Astrophysics Data System (ADS)
Mattiazzo, S.; Aimo, I.; Baudot, J.; Bedda, C.; La Rocca, P.; Perez, A.; Riggi, F.; Spiriti, E.
2015-10-01
The ALICE experiment at CERN will undergo a major upgrade in the second Long LHC Shutdown in the years 2018-2019; this upgrade includes the full replacement of the Inner Tracking System (ITS), deploying seven layers of Monolithic Active Pixel Sensors (MAPS). For the development of the new ALICE ITS, the Tower-Jazz 0.18 μm CMOS imaging sensor process has been chosen as it is possible to use full CMOS in the pixel and different silicon wafers (including high resistivity epitaxial layers). A large test campaign has been carried out on several small prototype chips, designed to optimize the pixel sensor layout and the front-end electronics. Results match the target requirements both in terms of performance and of radiation hardness. Following this development, the first full scale chips have been designed, submitted and are currently under test, with promising results. A telescope composed of 4 planes of Mimosa-28 and 2 planes of Mimosa-18 chips is under development at the DAFNE Beam Test Facility (BTF) at the INFN Laboratori Nazionali di Frascati (LNF) in Italy with the final goal to perform a comparative test of the full scale prototypes. The telescope has been recently used to test a Mimosa-22THRb chip (a monolithic pixel sensor built in the 0.18 μm Tower-Jazz process) and we foresee to perform tests on the full scale chips for the ALICE ITS upgrade at the beginning of 2015. In this contribution we will describe some first measurements of spatial resolution, fake hit rate and detection efficiency of the Mimosa-22THRb chip obtained at the BTF facility in June 2014 with an electron beam of 500 MeV.
Gas-injection-start and shutdown characteristics of a 2-kilowatt to 15-kilowatt Brayton power system
NASA Technical Reports Server (NTRS)
Cantoni, D. A.
1972-01-01
Two methods of starting the Brayton power system have been considered: (1) using the alternator as a motor to spin the Brayton rotating unit (BRU), and (2) spinning the BRU by forced gas injection. The first method requires the use of an auxiliary electrical power source. An alternating voltage is applied to the terminals of the alternator to drive it as an induction motor. Only gas-injection starts are discussed in this report. The gas-injection starting method requires high-pressure gas storage and valves to route the gas flow to provide correct BRU rotation. An analog computer simulation was used to size hardware and to determine safe start and shutdown procedures. The simulation was also used to define the range of conditions for successful startups. Experimental data were also obtained under various test conditions. These data verify the validity of the start and shutdown procedures.
MFTF-. cap alpha. + T progress report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nelson, W.D.
1985-04-01
Early in FY 1983, several upgrades of the Mirror Fusion Test Facility (MFTF-B) at Lawrence Livermore National Laboratory (LLNL) were proposed to the fusion community. The one most favorably received was designated MFTF-..cap alpha..+T. The engineering design of this device, guided by LLNL, has been a principal activity of the Fusion Engineering Design Center during FY 1983. This interim progress report represents a snapshot of the device design, which was begun in FY 1983 and will continue for several years. The report is organized as a complete design description. Because it is an interim report, some parts are incomplete; theymore » will be supplied as the design study proceeds. As described in this report, MFTF-..cap alpha..+T uses existing facilities, many MFTF-B components, and a number of innovations to improve on the physics parameters of MFTF-B. It burns deuterium-tritium and has a central-cell Q of 2, a wall loading GAMMA/sub n/ of 2 MW/m/sup 2/ (with a central-cell insert module), and an availability of 10%. The machine is fully shielded, allows hands-on maintenance of components outside the vacuum vessel 24 h after shutdown, and has provisions for repair of all operating components.« less
Code of Federal Regulations, 2013 CFR
2013-01-01
... input at the oscillators' supports. Safe Shutdown Earthquake Ground Motion is the vibratory ground... forces. Tectonic surface deformation is associated with earthquake processes. Testing reactor means a...
Code of Federal Regulations, 2012 CFR
2012-01-01
... input at the oscillators' supports. Safe Shutdown Earthquake Ground Motion is the vibratory ground... forces. Tectonic surface deformation is associated with earthquake processes. Testing reactor means a...
Sloto, Ronald A.
2009-01-01
Several shutdown-rebound tests have been conducted at the Henderson Road Superfund Site, which has been on the U.S. Environmental Protection Agency's National Priorities List since 1984. For a given test, the extraction wells are turned off, and water samples are collected from selected monitor wells at regular intervals before and during cessation of pumping to monitor for changes in chemical concentrations. A long-term shutdown-rebound test began on July 17, 2006. In support of this test, the U.S. Geological Survey conducted this study to determine the effects of shutting down on-site extraction wells on concentrations of selected contaminants and water levels. Concentrations were compared to ARARs (applicable relevant and appropriate requirements), which were set as remediation goals in the Henderson Road Site Record of Decision. Water from 10 wells in and near the source area and to the north, northeast, and northwest of the source area sampled in 2008 exceeded the 5.52 ug/L (micrograms per liter) ARAR for benzene. The greatest changes in benzene concentration between pre-shutdown samples collected in July 2006 and samples collected in February and March 2008 (19 months after the shutdown) were for wells in and north of the source area; increases in benzene concentration ranged from 1.5 to 164 ug/L. Water from five wells in the source area and to the north and northwest of the source area sampled in 2008 exceeded the 60 ug/L ARAR for chlorobenzene. The greatest changes in chlorobenzene concentration between pre-shutdown samples collected in July 2006 and samples collected in February and March 2008 were for wells north of the source area; increases in chlorobenzene concentration ranged from 6.9 to 99 ug/L. The highest concentrations of chlorobenzene were near or outside the northern site boundary, indicating chlorobenzene may have moved north away from the source area; however, no monitor well clusters are on the northern side of the Pennsylvania Turnpike, which is about 190 feet north of the source area. A much larger area was affected by chlorobenzene than benzene. Chlorobenzene concentrations decreased in the source area and increased at and beyond the site boundary. Water from four wells in and northeast of the source area sampled in 2008 exceeded the 5.06 ug/L ARAR for 1,1-dichloroethane (1,1-DCA). Increases in 1,1-DCA concentration between pre-shutdown samples collected in July 2006 and samples collected in February 2008 ranged from 0.4 to 20 ug/L. Water from two wells in the source area sampled in 2008 exceeded the 175 ug/L ARAR for total xylene. The 1,1-DCA and xylene plumes appear to extend in an east-northeast direction from the source area. Large drawdowns in the Upper Merion Reservoir during droughts in 1998 and 2001 affected water levels in the Chester Valley and at the Henderson Road Site, except for well HR-17-170. After the drought of 2001, water levels in the Chester Valley showed a protracted recovery lasting from September 2001 until June 2005 (46 months). Water-level data were evaluated temporally for 1997-2008 and spatially for (1) June 16, 2003, when the extraction wells were pumping at the full rate prior to the start of the June 2003 shutdown test; (2) July 10, 2006, during the period of reduced pumping after the June 2003 shutdown test; and (3) February 25-29, 2008, when the extraction wells were not pumping. Except for well HR-5-195, wells were categorized as shallow, intermediate-depth, and deep wells. The potentiometric surface for shallow wells did not appear to be affected by pumping of the extraction wells. The general direction of ground-water flow was to the north. The potentiometric surface for intermediate-depth wells showed a cone of depression when the extraction wells were pumping at the full rate but did not show a cone of depression when the extraction wells were pumping at the reduced rate. The ground-water-flow direction was toward the north and northeast, similar to
Monitoring, safety systems for LNG and LPG operators
DOE Office of Scientific and Technical Information (OSTI.GOV)
True, W.R.
Operators in Korea and Australia have chosen monitoring and control systems in recent contracts for LNG and LPG storage. Korea Gas Corp. (Kogas) has hired Whessoe Varec, Calais, to provide monitoring systems for four LNG storage tanks being built at Kogas` Inchon terminal. For Elgas Ltd., Port Botany, Australia, Whessoe Varec has already shipped a safety valve-shutdown system to a new LPG cavern-storage facility under construction. The paper describes the systems, terminal monitoring, dynamic approach to tank management, and meeting the growing demand for LPG.
40 CFR 63.1111 - Startup, shutdown, and malfunction.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 10 2010-07-01 2010-07-01 false Startup, shutdown, and malfunction. 63.1111 Section 63.1111 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... Control Technology Standards § 63.1111 Startup, shutdown, and malfunction. (a) Startup, shutdown, and...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kim, Hang Bae
A reliability testing was performed for the software of Shutdown(SDS) Computers for Wolsong Nuclear Power Plants Units 2, 3 and 4. profiles to the SDS Computers and compared the outputs with the predicted results generated by the oracle. Test softwares were written to execute the test automatically. Random test profiles were generated using analysis code. 11 refs., 1 fig.
46 CFR 61.35-3 - Required tests and checks.
Code of Federal Regulations, 2010 CFR
2010-10-01
... heaters without water level controls) must be tested by interrupting the feed water supply. Manual reset... alarm and visible indicator must be verified. The shutdown times must be verified. (3) Fuel supply... draft loss interlock switch must be tested to ensure proper operation. The draft limit control must...
N Reactor Deactivation Program Plan. Revision 4
DOE Office of Scientific and Technical Information (OSTI.GOV)
Walsh, J.L.
1993-12-01
This N Reactor Deactivation Program Plan is structured to provide the basic methodology required to place N Reactor and supporting facilities {center_dot} in a radiologically and environmentally safe condition such that they can be decommissioned at a later date. Deactivation will be in accordance with facility transfer criteria specified in Department of Energy (DOE) and Westinghouse Hanford Company (WHC) guidance. Transition activities primarily involve shutdown and isolation of operational systems and buildings, radiological/hazardous waste cleanup, N Fuel Basin stabilization and environmental stabilization of the facilities. The N Reactor Deactivation Program covers the period FY 1992 through FY 1997. The directivemore » to cease N Reactor preservation and prepare for decommissioning was issued by DOE to WHC on September 20, 1991. The work year and budget data supporting the Work Breakdown Structure in this document are found in the Activity Data Sheets (ADS) and the Environmental Restoration Program Baseline, that are prepared annually.« less
Reducing shingle waste at a manufacturing facility: 1990 MNTAP summer intern report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Menke, D.
1990-12-31
CertainTeed manufactures roofing shingles at it`s Shakopee, MN facility. Two process coating lines, and one assembly line, produce fifteen shingle types in fifteen different colors. The wastes generated by this process were the result of planned and unplanned variations in the continuous production process. Planned variations included changes in color, while felt breaks were common unplanned variations. Five options were identified that could reduce the amount of waste generated: Using a standard procedure for recovering from felt breaks, Creating a process cushion to maintain continuous production in the event of temporary shutdowns, An automated color change process, Manufacture of amore » new product from waste material, Minor process changes to reduce the frequency of breaks.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Srinivasan, M.G.; Kot, C.A.; Mojtahed, M.
The paper describes the analytical modeling, calculations, and results of the posttest nonlinear simulation of high-level seismic testing of the VKL piping system at the HDR Test Facility in Germany. One of the objectives of the tests was to evaluate analytical methods for calculating the nonlinear response of realistic piping systems subjected to high-level seismic excitation that would induce significant plastic deformation. Two out of the six different pipe-support configurations, (ranging from a stiff system with struts and snubbers to a very flexible system with practically no seismic supports), subjected to simulated earthquakes, were tested at very high levels. Themore » posttest nonlinear calculations cover the KWU configuration, a reasonably compliant system with only rigid struts. Responses for 800% safe-shutdown-earthquake loading were calculated using the NONPIPE code. The responses calculated with NONPIPE were found generally to have the same time trends as the measurements but contained under-, over-, and correct estimates of peak values, almost in equal proportions. The only exceptions were the peak strut forces, which were underestimated as a group. The scatter in the peak value estimate of displacements and strut forces was smaller than that for the strains. The possible reasons for the differences and the effort on further analysis are discussed.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Abrams, W.T.; Cope, A.W.; Orsulak, R.M.
The overall objective of Task 1 was to demonstrate an effective method for removing tenacious corrosion products in a pressurized water reactor steam generator and thus significantly reduce radiation exposure during subsequent maintenance activities. Various decontamination methods were evaluated and a multistep, low concentration chemical process originated by Kraftwerk Union A.G. (KWU) of the Federal Republic of Germany was selected. The process was further developed and tested by C-E and KWU in West Germany and at C-E's facilities in Windsor, Connecticut. C-E designed, fabricated and tested a portable system to apply the process at Millstone Point II. The decontamination ofmore » the primary channel heads of the two Millstone steam generators was performed by C-E and NUSCO during the 1983 refueling shutdown of Millstone Point II plant. Results of the decontamination were very satisfactory. NUSCO determined that a net savings of 3660 man-rem of personnel exposure was realized during the decontamination demonstration and the subsequent maintenance work on the steam generators.« less
Lottin, Olivier; Dillet, Jerome; Maranzana, Gael; ...
2015-09-14
Separate testing protocols for fuel cell startups and shutdowns were developed to distinguish between their effects on reverse currents and CO 2 evolution. The internal currents and the local potentials were measured with different membrane-electrode assemblies (MEAs): we examined the influence of the type of carbon for cathode catalyst support as well as the mitigating effect of low anode Pt loading. In conclusion, significant differences were observed and the experiments also confirmed previous results that the evolved CO 2 accounts for less than 25% of the total exchanged charge.
Design, Simulation, and Preliminary Testing of a 20 Ampere Energy Management System
2015-06-01
Vre f 0.5 V 0.58 V Vil 0.8 V 1.1 V Vih 1.9 V 2.25 V An important feature of this power module is the smart shutdown feature [15]. A simpli- fied...protection is removed when the pin voltage reaches the high-logic level Vih [15]. Values for Rshunt , RSD, and CSD had to be selected to implement this over...0.58 V Vil 0.8 V Vih 2.25 V Table 3.3. Truth table for H-bridge IGBTs, from [16]. Logic Input Output Shutdown Pin Lower IGBT Upper IGBT Lower IGBT
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lottin, Olivier; Dillet, Jerome; Maranzana, Gael
Separate testing protocols for fuel cell startups and shutdowns were developed to distinguish between their effects on reverse currents and CO 2 evolution. The internal currents and the local potentials were measured with different membrane-electrode assemblies (MEAs): we examined the influence of the type of carbon for cathode catalyst support as well as the mitigating effect of low anode Pt loading. In conclusion, significant differences were observed and the experiments also confirmed previous results that the evolved CO 2 accounts for less than 25% of the total exchanged charge.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cletcher, J.W.
1995-10-01
This is a regular report of summary statistics relating to recent reactor shutdown experience. The information includes both number of events and rates of occurence. It was compiled from data about operating events that were entered into the SCSS data system by the Nuclear Operations Analysis Center at the Oak ridge National Laboratory and covers the six mont period of July 1 to December 31, 1994. Cumulative information, starting from May 1, 1994, is also reported. Updates on shutdown events included in earlier reports is excluded. Information on shutdowns as a function of reactor power at the time of themore » shutdown for both BWR and PWR reactors is given. Data is also discerned by shutdown type and reactor age.« less
Code of Federal Regulations, 2011 CFR
2011-07-01
... during periods of startup, shutdown, and malfunction? 60.1710 Section 60.1710 Protection of Environment... during periods of startup, shutdown, and malfunction? (a) The emission limits of this subpart apply at all times except during periods of municipal waste combustion unit startup, shutdown, or malfunction...
40 CFR Table 1 to Subpart Aaaa of... - Applicability of NESHAP General Provisions to Subpart AAAA
Code of Federal Regulations, 2012 CFR
2012-07-01
... constructed, and reconstructed sources 63.6(e) Operation and maintenance requirements, startup, shutdown and... taken during a startup, shutdown and malfunction plan are consistent with the procedures in the startup, shutdown and malfunction plan, this information shall be included in a semi-annual startup, shutdown and...
Code of Federal Regulations, 2014 CFR
2014-07-01
... during periods of startup, shutdown, and malfunction? 62.15165 Section 62.15165 Protection of Environment... emission limits during periods of startup, shutdown, and malfunction? (a) The emission limits of this subpart apply at all times except during periods of municipal waste combustion unit startup, shutdown, or...
40 CFR Table 1 to Subpart Aaaa of... - Applicability of NESHAP General Provisions to Subpart AAAA
Code of Federal Regulations, 2014 CFR
2014-07-01
... constructed, and reconstructed sources 63.6(e) Operation and maintenance requirements, startup, shutdown and... taken during a startup, shutdown and malfunction plan are consistent with the procedures in the startup, shutdown and malfunction plan, this information shall be included in a semi-annual startup, shutdown and...
Code of Federal Regulations, 2011 CFR
2011-07-01
... requirements during periods of startup, shutdown, and malfunction? 60.1205 Section 60.1205 Protection of... requirements during periods of startup, shutdown, and malfunction? (a) The operating requirements of this subpart apply at all times except during periods of municipal waste combustion unit startup, shutdown, or...
Code of Federal Regulations, 2011 CFR
2011-07-01
... during periods of startup, shutdown, and malfunction? 62.15165 Section 62.15165 Protection of Environment... emission limits during periods of startup, shutdown, and malfunction? (a) The emission limits of this subpart apply at all times except during periods of municipal waste combustion unit startup, shutdown, or...
Code of Federal Regulations, 2010 CFR
2010-07-01
... requirements during periods of startup, shutdown, and malfunction? 60.1205 Section 60.1205 Protection of... requirements during periods of startup, shutdown, and malfunction? (a) The operating requirements of this subpart apply at all times except during periods of municipal waste combustion unit startup, shutdown, or...
Code of Federal Regulations, 2012 CFR
2012-07-01
... during periods of startup, shutdown, and malfunction? 62.15165 Section 62.15165 Protection of Environment... emission limits during periods of startup, shutdown, and malfunction? (a) The emission limits of this subpart apply at all times except during periods of municipal waste combustion unit startup, shutdown, or...
Code of Federal Regulations, 2012 CFR
2012-07-01
... requirements during periods of startup, shutdown, and malfunction? 60.1205 Section 60.1205 Protection of... requirements during periods of startup, shutdown, and malfunction? (a) The operating requirements of this subpart apply at all times except during periods of municipal waste combustion unit startup, shutdown, or...
Code of Federal Regulations, 2013 CFR
2013-07-01
... during periods of startup, shutdown, and malfunction? 60.1710 Section 60.1710 Protection of Environment... during periods of startup, shutdown, and malfunction? (a) The emission limits of this subpart apply at all times except during periods of municipal waste combustion unit startup, shutdown, or malfunction...
Code of Federal Regulations, 2013 CFR
2013-07-01
... during periods of startup, shutdown, and malfunction? 62.15165 Section 62.15165 Protection of Environment... emission limits during periods of startup, shutdown, and malfunction? (a) The emission limits of this subpart apply at all times except during periods of municipal waste combustion unit startup, shutdown, or...
Code of Federal Regulations, 2014 CFR
2014-07-01
... requirements during periods of startup, shutdown, and malfunction? 60.1205 Section 60.1205 Protection of... requirements during periods of startup, shutdown, and malfunction? (a) The operating requirements of this subpart apply at all times except during periods of municipal waste combustion unit startup, shutdown, or...
40 CFR Table 1 to Subpart Aaaa of... - Applicability of NESHAP General Provisions to Subpart AAAA
Code of Federal Regulations, 2013 CFR
2013-07-01
... constructed, and reconstructed sources 63.6(e) Operation and maintenance requirements, startup, shutdown and... taken during a startup, shutdown and malfunction plan are consistent with the procedures in the startup, shutdown and malfunction plan, this information shall be included in a semi-annual startup, shutdown and...
Code of Federal Regulations, 2010 CFR
2010-07-01
... during periods of startup, shutdown, and malfunction? 62.15165 Section 62.15165 Protection of Environment... emission limits during periods of startup, shutdown, and malfunction? (a) The emission limits of this subpart apply at all times except during periods of municipal waste combustion unit startup, shutdown, or...
Code of Federal Regulations, 2013 CFR
2013-07-01
... requirements during periods of startup, shutdown, and malfunction? 60.1205 Section 60.1205 Protection of... requirements during periods of startup, shutdown, and malfunction? (a) The operating requirements of this subpart apply at all times except during periods of municipal waste combustion unit startup, shutdown, or...
Code of Federal Regulations, 2010 CFR
2010-07-01
... during periods of startup, shutdown, and malfunction? 60.1710 Section 60.1710 Protection of Environment... during periods of startup, shutdown, and malfunction? (a) The emission limits of this subpart apply at all times except during periods of municipal waste combustion unit startup, shutdown, or malfunction...
Code of Federal Regulations, 2014 CFR
2014-07-01
... during periods of startup, shutdown, and malfunction? 60.1710 Section 60.1710 Protection of Environment... during periods of startup, shutdown, and malfunction? (a) The emission limits of this subpart apply at all times except during periods of municipal waste combustion unit startup, shutdown, or malfunction...
Code of Federal Regulations, 2012 CFR
2012-07-01
... during periods of startup, shutdown, and malfunction? 60.1710 Section 60.1710 Protection of Environment... during periods of startup, shutdown, and malfunction? (a) The emission limits of this subpart apply at all times except during periods of municipal waste combustion unit startup, shutdown, or malfunction...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Maheras, Steven J.; Best, Ralph E.; Ross, Steven B.
This report presents a preliminary evaluation of removing used nuclear fuel (UNF) from 12 shutdown nuclear power plant sites. At these shutdown sites the nuclear power reactors have been permanently shut down and the sites have been decommissioned or are undergoing decommissioning. The shutdown sites are Maine Yankee, Yankee Rowe, Connecticut Yankee, Humboldt Bay, Big Rock Point, Rancho Seco, Trojan, La Crosse, Zion, Crystal River, Kewaunee, and San Onofre. The evaluation was divided into four components: characterization of the UNF and greater-than-Class C low-level radioactive waste (GTCC waste) inventory; a description of the on-site infrastructure and conditions relevant to transportationmore » of UNF and GTCC waste; an evaluation of the near-site transportation infrastructure and experience relevant to shipping transportation casks containing UNF and GTCC waste, including identification of gaps in information; and, an evaluation of the actions necessary to prepare for and remove UNF and GTCC waste. The primary sources for the inventory of UNF and GTCC waste are the U.S. Department of Energy (DOE) RW-859 used nuclear fuel inventory database, industry sources such as StoreFUEL and SpentFUEL, and government sources such as the U.S. Nuclear Regulatory Commission. The primary sources for information on the conditions of site and near-site transportation infrastructure and experience included observations and information collected during visits to the Maine Yankee, Yankee Rowe, Connecticut Yankee, Humboldt Bay, Big Rock Point, Rancho Seco, Trojan, La Crosse, and Zion sites; information provided by managers at the shutdown sites; Facility Interface Data Sheets compiled for DOE in 2005; Services Planning Documents prepared for DOE in 1993 and 1994; industry publications such as Radwaste Solutions; and Google Earth. State and Regional Group representatives, a Tribal representative, and a Federal Railroad Administration representative participated in six of the shutdown site visits. Every site was found to have at least one off-site transportation mode option for removing its UNF and GTCC waste; some have multiple options. Experience removing large components during reactor decommissioning provided an important source of information used to identify the transportation mode options for the sites. Especially important in conducting the evaluation were site visits, through which information was obtained that would not have been available otherwise. Extensive photographs taken during the site visits proved to be particularly useful in documenting the current conditions at or near the sites. Additional conclusions from this evaluation include: The 12 shutdown sites use designs from 4 different suppliers involving 9 different (horizontal and vertical) dry storage systems that would require the use of 8 different transportation cask designs to remove the UNF and GTCC waste from the shutdown sites; Although there are common aspects, each site has some unique features and/or conditions; Although some regulatory actions will be required, all UNF at the initial 9 shutdown sites (Maine Yankee, Yankee Rowe, Connecticut Yankee, Humboldt Bay, Big Rock Point, Rancho Seco, Trojan, La Crosse, and Zion) is in licensed systems that can be transported, including a small amount of high-burnup fuel; Each site indicated that 2-3 years of advance time would be required for its preparations before shipments could begin; Most sites have more than one transportation option, e.g., rail, barge, or heavy haul truck, as well as constraints and preferences. It is expected that additional site visits will be conducted to add to the information presented in the evaluation.« less
Characterization of On-Orbit U.S. Lab Condensate Vacuum Venting
NASA Astrophysics Data System (ADS)
Schmidl, W. D.; Alred, J. A.; Mikatarian, R.; Soares, C.; Miles, E.
2002-01-01
The venting of liquid streams into a vacuum has been studied extensively for many years. An experiment was performed aboard the International Space Station (ISS) to video tape the U.S. Lab's condensate venting event with cameras located on the Space Station Remote Manipulator System (SSRMS). Images of the vent plume were acquired close to both the port and starboard vent nozzles. The imaging started with a wider view and then zoomed in closer before the shutdown phase of the vent event occurred. The objective of this experiment was to extend our understanding of the properties of venting liquids into space. Data from the video images were analyzed to obtain the approximate cone angle encompassing the core of the vent plume. The condensate vent plume was characterized as having three phases, a startup phase, a nominal phase, and a shutdown phase. The startup phase consisted of the initial period when the vent first started and the liquid first entered the heated line. The nominal phase was the period when the majority of the liquid was vented. The shutdown phase occurs close to the end of the vent event. The shutdown phase was further divided into two parts, the shutdown initial phase, and a later shutdown sputtering phase. The shutdown initial phase occurs when gas becomes entrained in the condensate liquid being vented. The sputtering phase occurred after the vent valve was closed, and the liquid/ice in the line was removed by continuing to heat the line to bake it out. It was determined that the ice particles were ejected at higher angles, but lower velocities, during the startup and shutdown phases. The number and velocities of ice particles ejected outside of the core region, during the startup, initial shutdown and shutdown sputtering phases were determined. The core of liquid ejected during the startup and shutdown phases was contained within a half cone angle of less than 60 degrees. The startup phase took approximately 36 seconds, the shutdown initial phase took approximately 22 seconds, and the shutdown sputtering phase took approximately 32 seconds. Results from the experiment were correlated with the Boeing ISS vent plume model.
40 CFR 86.237-94 - Dynamometer test run, gaseous emissions.
Code of Federal Regulations, 2013 CFR
2013-07-01
... approximately 7.5 miles (12.1 kilometers) and a hot start drive of approximately 3.6 miles (5.8 kilometers). (b... and hot start test. The cold start test is divided into two periods. The first period, representing..., consists of the remainder of the driving schedule, including engine shutdown. The hot start test is...
40 CFR 86.237-94 - Dynamometer test run, gaseous emissions.
Code of Federal Regulations, 2011 CFR
2011-07-01
... approximately 7.5 miles (12.1 kilometers) and a hot start drive of approximately 3.6 miles (5.8 kilometers). (b... and hot start test. The cold start test is divided into two periods. The first period, representing..., consists of the remainder of the driving schedule, including engine shutdown. The hot start test is...
40 CFR 86.237-94 - Dynamometer test run, gaseous emissions.
Code of Federal Regulations, 2012 CFR
2012-07-01
... approximately 7.5 miles (12.1 kilometers) and a hot start drive of approximately 3.6 miles (5.8 kilometers). (b... and hot start test. The cold start test is divided into two periods. The first period, representing..., consists of the remainder of the driving schedule, including engine shutdown. The hot start test is...
Status of the NRC Decommissioning Program
DOE Office of Scientific and Technical Information (OSTI.GOV)
Orlando, D. A.; Camper, L.; Buckley, J.
2003-02-24
On July 21, 1997, the U.S. Nuclear Regulatory Commission (NRC) published the final rule on Radiological Criteria for License Termination (the License Termination Rule or LTR) as Subpart E to 10 CFR Part 20. NRC regulations require that materials licensees submit Decommissioning Plans to support the decommissioning of its facility if it is required by license condition, or if the procedures and activities necessary to carry out the decommissioning have not been approved by NRC and these procedures could increase the potential health and safety impacts to the workers or the public. NRC regulations also require that reactor licensees submitmore » Post-shutdown Decommissioning Activities Reports and License Termination Plans to support the decommissioning of nuclear power facilities. This paper provides an update on the status of the NRC's decommissioning program that was presented during WM'02. It discusses the staff's current efforts to streamline the decommissioning process, current issues being faced in the decommissioning program, such as partial site release and restricted release of sites, as well as the status of the decommissioning of complex sites and those listed in the Site Decommissioning Management Plan. The paper discusses the status of permanently shut-down commercial power reactors and the transfer of complex decommissioning sites and sites listed on the SDMP to Agreement States. Finally the paper provides an update of the status of various tools and guidance the NRC is developing to assist licensees during decommissioning, including an effort to consolidate and risk-inform decommissioning guidance.« less
46 CFR 176.810 - Fire protection.
Code of Federal Regulations, 2011 CFR
2011-10-01
...) Inspection of each hand portable fire extinguisher, semiportable fire extinguisher, and fixed gas fire..., and valves, and the inspection and testing of alarms and ventilation shutdowns, for each fixed gas...) Checking of each cylinder containing compressed gas to ensure it has been tested and marked in accordance...
Fast shut-down protection system for radio frequency breakdown and multipactor testing.
Graves, T P; Hanson, P; Michaelson, J M; Farkas, A D; Hubble, A A
2014-02-01
Radio frequency (RF) breakdown such as multipactor or ionization breakdown is a device-limiting phenomenon for on-orbit spacecraft used for communication, navigation, or other RF payloads. Ground testing is therefore part of the qualification process for all high power components used in these space systems. This paper illustrates a shut-down protection system to be incorporated into multipactor/ionization breakdown ground testing for susceptible RF devices. This 8 channel system allows simultaneous use of different diagnostic classes and different noise floors. With initiation of a breakdown event, diagnostic signals increase above a user-specified level, which then opens an RF switch to eliminate RF power from the high power amplifier. Examples of this system in use are shown for a typical setup, illustrating the reproducibility of breakdown threshold voltages and the lack of multipactor conditioning. This system can also be utilized to prevent excessive damage to RF components in tests with sensitive or flight hardware.
Code of Federal Regulations, 2014 CFR
2014-07-01
... Standards for Hazardous Air Pollutants for Engine Test Cells/Stands General Compliane Requirements § 63.9306... at all times that an engine test cell/stand is operating, except during monitoring malfunctions... engine test cell/stand is operating. You must inspect the automatic shutdown system at least once every...
Code of Federal Regulations, 2013 CFR
2013-07-01
... Standards for Hazardous Air Pollutants for Engine Test Cells/Stands General Compliane Requirements § 63.9306... at all times that an engine test cell/stand is operating, except during monitoring malfunctions... engine test cell/stand is operating. You must inspect the automatic shutdown system at least once every...
Health status of copper refinery workers with specific reference to selenium exposure
DOE Office of Scientific and Technical Information (OSTI.GOV)
Holness, D.L.; Taraschuk, I.G.; Nethercott, J.R.
1989-09-01
Copper refinery workers exposed to selenium were studied before, during, and after a shutdown period. Urine selenium levels were 83 {plus minus} 30 mumol/mol creatinine and 69 {plus minus} 27 mumol/mol creatinine when measured on two occasions during exposure compared with 56 {plus minus} 17 mumol/mol creatinine when the workers had been free of exposure for 10 wk during a shutdown. The refinery workers reported more nose and eye irritation, indigestion, stomach pain, and fatigue than controls. Garlic-like breath odor was reported to be personally and socially offensive by many of the workers. Reporting of symptoms, pulmonary function indices, andmore » laboratory test results did not change with exposure except for hemoglobin level, which rose during the shutdown. Hemoglobin levels were found to be inversely correlated with the urine selenium level, and there was a positive correlation noted for the interactive effect of urine selenium and urine arsenic levels on hemoglobin.49 references.« less
Understanding Excess Emissions from Industrial Facilities: Evidence from Texas.
Zirogiannis, Nikolaos; Hollingsworth, Alex J; Konisky, David M
2018-03-06
We analyze excess emissions from industrial facilities in Texas using data from the Texas Commission on Environmental Quality. Emissions are characterized as excess if they are beyond a facility's permitted levels and if they occur during startups, shutdowns, or malfunctions. We provide summary data on both the pollutants most often emitted as excess emissions and the industrial sectors and facilities responsible for those emissions. Excess emissions often represent a substantial share of a facility's routine (or permitted) emissions. We find that while excess emissions events are frequent, the majority of excess emissions are emitted by the largest events. That is, the sum of emissions in the 96-100th percentile is often several orders of magnitude larger than the remaining excess emissions (i.e., the sum of emissions below the 95th percentile). Thus, the majority of events emit a small amount of pollution relative to the total amount emitted. In addition, a small group of high emitting facilities in the most polluting industrial sectors are responsible for the vast majority of excess emissions. Using an integrated assessment model, we estimate that the health damages in Texas from excess emissions are approximately $150 million annually.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hebdon, J.; Yerxa, J.; Romine, L.
The Hanford Nuclear Reservation is a former U. S. Department of Energy Defense Production Site. The site is currently listed on the National Priorities List of the Comprehensive Environmental Response Compensation and Liability Act of 1980 (CERCLA) and is undergoing cleanup and environmental restoration. The PFP is a former Plutonium metal production facility. The operating mission of the PFP ended with a DOE Headquarters shutdown letter in October of 1996. Generally, the receipt of a shutdown letter initiates the start of Transition (as the first step of Decommissioning) of a facility. The Hanford site is subject to the Hanford Federalmore » Facilities Compliance Act and Consent Order (HFFCCO), an order on consent signed by the DOE, the U. S. Environmental Protection Agency, (EPA) and the Washington Department of Ecology (WDOE). Under the HFFCCO, negotiations for transition milestones begin within six months after the issuance of a shutdown order. In the case of the PFP, the Nuclear Materials disposition and stabilization activities, a DOE responsibility, were necessary as precursor activities to Transition. This situation precipitated a crisis in the negotiations between the agencies, and formal negotiations initiated in 1997 ended in failure. The negotiations reached impasse on several key regulatory and operational issues. The 1997 negotiation was characterized by a strongly positional style. DOE and the regulatory personnel took hard lines early in the negotiations and were unable to move to resolution of key issues after a year and a half. This resulted in unhappy stakeholders, poor publicity and work delays as well as wounded relationships between DOE and the regulatory community. In the 2000-2001 PFP negotiations, a completely different approach was suggested and eventually initiated: Collaborative Negotiations. The collaborative negotiation style resulted in agreement between the agencies on all key issues within 6 months of initiation. All parties were very pleased with the results and all parties were relieved that protracted negotiations sessions were not needed with the new style of working together collaboratively to serve each other's interests. The characteristics of collaborative negotiations included building trust, emphasizing equality of team members, problem solving by the entire team, relying on individual communications and self-management skills. The team found that trust building sessions were key to successfully working through issues. Relationship differences were too often ignored in the past negotiations and were recognized and worked through in the collaborative process.« less
NASA Technical Reports Server (NTRS)
Greene, William D.; Kynard, Michael H.; Tiller, Bruce K. (Technical Monitor)
2002-01-01
STS-104, launched July 2001, marked the first flight of a single Block 2 Space Shuttle Main Engine (SSME). This new configuration of the SSME is the culmination of well over a decade of gradual engine system upgrades. The launch and mission were a success. However, in the process of post-launch data analysis a Main Propulsion System (MPS) anomaly was noted and tied directly to the shutdown of the Block 2 SSME. An investigation into this anomaly was organized across NASA facilities and across the various hardware component contractors. This paper is a very brief summary of the eventual understanding of the root causes of the anomaly and the process whereby an appropriate mitigation action was proposed. An analytical model of the High Pressure Fuel Pump (HPFP) and the low pressure fuel system of the SSME is presented to facilitate the presentation of this summary. The proposed mitigation action is discussed and, with the launch of STS-108 in November 2001, successfully demonstrated under flight conditions.
46 CFR 115.810 - Fire protection.
Code of Federal Regulations, 2011 CFR
2011-10-01
... extinguisher, semiportable fire extinguisher, and fixed gas fire extinguishing system to check for excessive... testing of alarms and ventilation shutdowns, for each fixed gas fire extinguishing system and detecting... gas to ensure it has been tested and marked in accordance with § 147.60 in subchapter N of this...
46 CFR 115.810 - Fire protection.
Code of Federal Regulations, 2010 CFR
2010-10-01
... extinguisher, semiportable fire extinguisher, and fixed gas fire extinguishing system to check for excessive... testing of alarms and ventilation shutdowns, for each fixed gas fire extinguishing system and detecting... gas to ensure it has been tested and marked in accordance with § 147.60 in subchapter N of this...
40 CFR 1065.930 - Engine starting, restarting, and shutdown.
Code of Federal Regulations, 2010 CFR
2010-07-01
... cranking time as normal. (c) Respond to engine stalling with the following steps: (1) If the engine stalls... 40 Protection of Environment 32 2010-07-01 2010-07-01 false Engine starting, restarting, and...) AIR POLLUTION CONTROLS ENGINE-TESTING PROCEDURES Field Testing and Portable Emission Measurement...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Josephson, J.; Sowa, E.S.
1977-04-01
The design and testing of a simple and reliable Self-Actuated Shutdown System (SASS) for the protection of Liquid Metal Fast Breeder Reactors (LMFBRs) is described. A ferromagnetic Curie temperature permanent magnet holding device has been selected for the design of the Self-Actuated Shutdown System in order to enhance the safety of liquid metal cooled fast reactors (LMFBRs). The self-actuated, self-contained device operates such that accident conditions, resulting in increased coolant temperature or neutron flux reduce the magnetic holding force suspending a neutron absorber above the core by raising the temperature of the trigger mechanism above the Curie point. Neutron absorbermore » material is then inserted into the core, under gravity, terminating the accident. Two possible design variations of the selected concept are presented.« less
NASA Technical Reports Server (NTRS)
Titterington, W. A.; Erickson, A. C.
1975-01-01
An advanced six-man rated oxygen generation system has been fabricated and tested as part of a NASA/JSC technology development program for a long lived, manned spacecraft life support system. Details of the design and tests results are presented. The system is based on the Solid Polymer Electrolyte (SPE) water electrolysis technology and its nominal operating conditions are 2760 kN/sq m (400 psia) and 355 K (180 F) with an electrolysis module current density capability up to 350 mA/sq cm (326 ASF). The system is centered on a 13-cell SPE water electrolysis module having a single cell active area of 214 sq cm (33 sq in) and it incorporates instrumentation and controls for single pushbutton automatic startup/shutdown, component fault detection and isolation, and self-contained sensors and controls for automatic safe emergency shutdown. The system has been tested in both the orbital cyclic and continuous mode of operation. Various parametric tests have been completed to define the system capability for potential application in spacecraft environmental systems.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rowsell, David Leon
This report documents the Contractor Readiness Assessment (CRA) for TREAT Fuel Movement and Control Rod Drives Isolation. The review followed the approved Plan of Action (POA) and Implementation Plan (IP) using the identified core requirements. The activity was limited scope focusing on the control rod drives functional isolation and fuel element movement. The purpose of this review is to ensure the facility's readiness to move fuel elements thus supporting inspection and functionally isolate the control rod drives to maintain the required shutdown margin.
NASA Astrophysics Data System (ADS)
Wallace, Jay R.
1989-03-01
This paper deals with the application of infrared imaging radiometry as a diagnostic inspection tool for locating a concealed leak in the refrigeration system supplying glycol coolant to the arena floor of an ice skating rink in a municipal coliseum facility. Scanning approximately 10 miles of black iron tubing embedded in the arena floor resulted in locating a leak within the supply/return side of the system. A secondary disclosure was a restriction to normal coolant flow in some delivery loops caused by sludge build-up. Specific inspection procedures were established to enhance temperature differentials suitable for good thermal imaging. One procedure utilized the temperature and pressure of the city water supply; a second the availability of 130F hot water from the facility's boiler system; and a third the building's own internal ambient temperature. Destructive testing and other data collection equipment confirmed the thermographic findings revealing a section of corrosion damaged pipe. Repair and flushing of the system was quickly completed with a minimum of construction costs and inconvenience. No financial losses were incurred due to the interruption of scheduled revenue events. Probable cause for the shutdown condition was attributed to a flawed installation decision made 15 years earlier during the initial construction stage.
Defense.gov Special Report: Government Shutdown
reached. Government shutdown avoided. Business as usual for all DOD employees. Deal Averts Shutdown Continuing Resolution (PDF) Deputy Secretary Lynn Message OMB Director Memo to Agencies (PDF) DOD Contingency
46 CFR 61.35-3 - Required tests and checks.
Code of Federal Regulations, 2013 CFR
2013-10-01
... controls must control and cycle the unit in the proper manner and sequence. Proper prepurge, ignition...) Limit controls. Shutdown caused by the limit controls must be verified. (9) Water level controls. Water level controls must be tested by slowly lowering the water level in the boiler. Each operating water...
46 CFR 61.35-3 - Required tests and checks.
Code of Federal Regulations, 2012 CFR
2012-10-01
... controls must control and cycle the unit in the proper manner and sequence. Proper prepurge, ignition...) Limit controls. Shutdown caused by the limit controls must be verified. (9) Water level controls. Water level controls must be tested by slowly lowering the water level in the boiler. Each operating water...
46 CFR 61.35-3 - Required tests and checks.
Code of Federal Regulations, 2014 CFR
2014-10-01
... controls must control and cycle the unit in the proper manner and sequence. Proper prepurge, ignition...) Limit controls. Shutdown caused by the limit controls must be verified. (9) Water level controls. Water level controls must be tested by slowly lowering the water level in the boiler. Each operating water...
46 CFR 61.35-3 - Required tests and checks.
Code of Federal Regulations, 2011 CFR
2011-10-01
... controls must control and cycle the unit in the proper manner and sequence. Proper prepurge, ignition...) Limit controls. Shutdown caused by the limit controls must be verified. (9) Water level controls. Water level controls must be tested by slowly lowering the water level in the boiler. Each operating water...
40 CFR 1036.525 - Hybrid engines.
Code of Federal Regulations, 2014 CFR
2014-07-01
... differences that apply under this section are related to engine mapping, engine shutdown during the test cycle... 40 Protection of Environment 33 2014-07-01 2014-07-01 false Hybrid engines. 1036.525 Section 1036... CONTROL OF EMISSIONS FROM NEW AND IN-USE HEAVY-DUTY HIGHWAY ENGINES Test Procedures § 1036.525 Hybrid...
40 CFR 63.1590 - What reports must I submit?
Code of Federal Regulations, 2013 CFR
2013-07-01
... will be used for determining continuing compliance; (iv) The type and quantity of HAP emitted by your... this part, including a notification of performance tests; a performance test report; a startup... must also submit a startup, shutdown, and malfunction report. [64 FR 57579, Oct. 26, 1999, as amended...
40 CFR 63.1590 - What reports must I submit?
Code of Federal Regulations, 2014 CFR
2014-07-01
... will be used for determining continuing compliance; (iv) The type and quantity of HAP emitted by your... this part, including a notification of performance tests; a performance test report; a startup... must also submit a startup, shutdown, and malfunction report. [64 FR 57579, Oct. 26, 1999, as amended...
40 CFR 63.1590 - What reports must I submit?
Code of Federal Regulations, 2012 CFR
2012-07-01
... will be used for determining continuing compliance; (iv) The type and quantity of HAP emitted by your... this part, including a notification of performance tests; a performance test report; a startup... must also submit a startup, shutdown, and malfunction report. [64 FR 57579, Oct. 26, 1999, as amended...
78 FR 52838 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-27
... Maintenance Planning Data (MPD) Document. Repeat the test thereafter at intervals not to exceed 7,500 flight... by loss of fuel system suction feed capability on one engine, and in-flight shutdown of the engine...-101, before further flight, perform all related testing and corrective actions, and repeat the...
40 CFR 86.1336-84 - Engine starting, restarting, and shutdown.
Code of Federal Regulations, 2012 CFR
2012-07-01
.... (4) If a failure to start occurs during the hot start portion of the test and is caused by engine... stalling. (1) If the engine stalls during the initial idle period of either the cold or hot start test, the engine shall be restarted immediately using the appropriate cold or hot starting procedure and the test...
40 CFR 86.1336-84 - Engine starting, restarting, and shutdown.
Code of Federal Regulations, 2013 CFR
2013-07-01
.... (4) If a failure to start occurs during the hot start portion of the test and is caused by engine... stalling. (1) If the engine stalls during the initial idle period of either the cold or hot start test, the engine shall be restarted immediately using the appropriate cold or hot starting procedure and the test...
40 CFR 86.1336-84 - Engine starting, restarting, and shutdown.
Code of Federal Regulations, 2011 CFR
2011-07-01
.... (4) If a failure to start occurs during the hot start portion of the test and is caused by engine... stalling. (1) If the engine stalls during the initial idle period of either the cold or hot start test, the engine shall be restarted immediately using the appropriate cold or hot starting procedure and the test...
46 CFR 111.33-7 - Alarms and shutdowns.
Code of Federal Regulations, 2010 CFR
2010-10-01
... REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-7 Alarms and shutdowns. Each power semiconductor rectifier must have a high temperature alarm or shutdown, except as provided in § 111.33-11. ...
NASA Technical Reports Server (NTRS)
Edwards, Daryl A.; Weaver, Harold F; Kastner, Carl E., Jr.
2009-01-01
The center-body diffuser (CBD) steam blocker (SB) system is a concept that incorporates a set of secondary drive nozzles into the envelope of a CBD, such that both nozzle systems (i.e., the rocket engine and the steam blocking nozzles) utilize the same supersonic diffuser, and will operate either singularly or concurrently. In this manner, the SB performs as an exhaust system stage when the rocket engine is not operating, and virtually eliminates discharge flow on rocket engine shutdown. A 2.25-percent scale model of a proposed SB integrated into a diffuser for the Plum Brook B-2 facility was constructed and cold-flow tested for the purpose of evaluating performance characteristics of various design options. These specific design options addressed secondary drive nozzle design (method of steam injection), secondary drive nozzle location relative to CBD throat, and center-body throat length to diameter (L/D) ratios. The objective of the test program is to identify the desired configuration to carry forward should the next phase of design proceed. The tested scale model can provide data for various pressure ratios; however, its design is based on a proposed B-2 spray chamber (SC) operating pressure of 4.0 psia and a steam supply pressure of 165 psia. Evaluation of the test data acquired during these tests indicate that either the discrete axial or annular nozzle configuration integrated into a CBD, with an annular throat length of 1.5 L/D at the nominal injection position, would be suitable to carry forward from the SB's perspective. Selection between these two then becomes more a function of constructability and implementation than performance. L/D also has some flexibility, and final L/D selection can be a function of constructability issues within a limited range.
40 CFR 60.4375 - What reports must I submit?
Code of Federal Regulations, 2010 CFR
2010-07-01
...). Excess emissions must be reported for all periods of unit operation, including start-up, shutdown, and...), you must submit a written report of the results of each performance test before the close of business...
Flight Hydrogen Sensor for use in the ISS Oxygen Generation Assembly
NASA Technical Reports Server (NTRS)
MSadoques, George, Jr.; Makel, Darby B.
2005-01-01
This paper provides a description of the hydrogen sensor Orbital Replacement Unit (ORU) used on the Oxygen Generation Assembly (OGA), to be operated on the International Space Station (ISS). The hydrogen sensor ORU is being provided by Makel Engineering, Inc. (MEI) to monitor the oxygen outlet for the presence of hydrogen. The hydrogen sensor ORU is a triple redundant design where each sensor converts raw measurements to actual hydrogen partial pressure that is reported to the OGA system controller. The signal outputs are utilized for system shutdown in the event that the hydrogen concentration in the oxygen outlet line exceeds the specified shutdown limit. Improvements have been made to the Micro-Electro-Mechanical Systems (MEMS) based sensing element, screening, and calibration process to meet OGA operating requirements. Two flight hydrogen sensor ORUs have successfully completed the acceptance test phase. This paper also describes the sensor s performance during acceptance testing, additional tests planned to extend the operational performance calibration cycle, and integration with the OGA system.
The 2013 US Government Shutdown (#Shutdown) and health: an emerging role for social media.
Merchant, Raina M; Ha, Yoonhee P; Wong, Charlene A; Schwartz, H Andrew; Sap, Maarten; Ungar, Lyle H; Asch, David A
2014-12-01
In October 2013, multiple United States (US) federal health departments and agencies posted on Twitter, "We're sorry, but we will not be tweeting or responding to @replies during the shutdown. We'll be back as soon as possible!" These "last tweets" and the millions of responses they generated revealed social media's role as a forum for sharing and discussing information rapidly. Social media are now among the few dominant communication channels used today. We used social media to characterize the public discourse and sentiment about the shutdown. The 2013 shutdown represented an opportunity to explore the role social media might play in events that could affect health.
NASA Astrophysics Data System (ADS)
Chen, Yang; Wang, Huasheng; Xia, Jixia; Cai, Guobiao; Zhang, Zhenpeng
2017-04-01
For the pressure reducing regulator and check valve double-valve combined test system in an integral bipropellant propulsion system, a system model is established with modular models of various typical components. The simulation research is conducted on the whole working process of an experiment of 9 MPa working condition from startup to rated working condition and finally to shutdown. Comparison of simulation results with test data shows: five working conditions including standby, startup, rated pressurization, shutdown and halt and nine stages of the combined test system are comprehensively disclosed; valve-spool opening and closing details of the regulator and two check valves are accurately revealed; the simulation also clarifies two phenomena which test data are unable to clarify, one is the critical opening state in which the check valve spools slightly open and close alternately in their own fully closed positions, the other is the obvious effects of flow-field temperature drop and temperature rise in pipeline network with helium gas flowing. Moreover, simulation results with consideration of component wall heat transfer are closer to the test data than those under the adiabatic-wall condition, and more able to reveal the dynamic characteristics of the system in various working stages.
Code of Federal Regulations, 2010 CFR
2010-07-01
....111) Owner or operator (§ 63.2) Performance evaluation (§ 63.2) Performance test (§ 63.2) Permitting...-up, shutdown, and malfunction plan (§ 63.101) State (§ 63.2) Stationary Source (§ 63.2) Surge control vessel (§ 63.161) Temperature monitoring device (§ 63.111) Test method (§ 63.2) Treatment process (§ 63...
46 CFR 132.350 - Tests and inspections of fire-extinguishing equipment.
Code of Federal Regulations, 2010 CFR
2010-10-01
... and halon portable fire extinguishers must be refilled when the weight loss of net content exceeds... weight loss exceeds 10% of weight of charge. Test time delays, alarms, and ventilation shutdowns with.... Inspect hoses and nozzles to be sure they are clean. Halon Weigh cylinders. Recharge if weight loss...
46 CFR 132.350 - Tests and inspections of fire-extinguishing equipment.
Code of Federal Regulations, 2011 CFR
2011-10-01
... and halon portable fire extinguishers must be refilled when the weight loss of net content exceeds... weight loss exceeds 10% of weight of charge. Test time delays, alarms, and ventilation shutdowns with.... Inspect hoses and nozzles to be sure they are clean. Halon Weigh cylinders. Recharge if weight loss...
Turbofan compressor dynamics during afterburner transients
NASA Technical Reports Server (NTRS)
Kurkov, A. P.
1975-01-01
The effects of afterburner light-off and shut-down transients on compressor stability were investigated. Experimental results are based on detailed high-response pressure and temperature measurements on the Tf30-p-3 turbofan engine. The tests were performed in an altitude test chamber simulating high-altitude engine operation. It is shown that during both types of transients, flow breaks down in the forward part of the fan-bypass duct. At a sufficiently low engine inlet pressure this resulted in a compressor stall. Complete flow breakdown within the compressor was preceded by a rotating stall. At some locations in the compressor, rotating stall cells initially extended only through part of the blade span. For the shutdown transient, the time between first and last detected occurrence of rotating stall is related to the flow Reynolds number. An attempt was made to deduce the number and speed of propagation of rotating stall cells.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1994-03-01
Fort Myer is a permanent United States Army installation located in Arlington County, Virginia, on a site backing Arlington National Cemetery and overlooking the Potomac River and Washington, D.C. The installation consists of offices, family housing, Army Band facilities, supporting facilities, and barracks buildings including those known as the `Old Guard Barracks` which house soldiers that provide services at Arlington National Cemetery. This report consists of the Summer Steam Shut Down Study of an Energy Savings Opportunity Survey (ESOS) at Fort Myer. The purpose of this study is to improve energy efficiency at Fort Myer by analyzing the effects andmore » benefits of closing the central steam producing boiler facility, Building 447, during the non-heating months from mid-May to mid-October. Currently, the central steam plant operates through this period to provide steam for domestic hot water, steam driven laundry presses, air conditioning system reheat, food preparation and dishwashing demands of twenty-two buildings on the base.« less
Overview and Current Status of Analyses of Potential LEU Design Concepts for TREAT
DOE Office of Scientific and Technical Information (OSTI.GOV)
Connaway, H. M.; Kontogeorgakos, D. C.; Papadias, D. D.
2015-10-01
Neutronic and thermal-hydraulic analyses have been performed to evaluate the performance of different low-enriched uranium (LEU) fuel design concepts for the conversion of the Transient Reactor Test Facility (TREAT) from its current high-enriched uranium (HEU) fuel. TREAT is an experimental reactor developed to generate high neutron flux transients for the testing of nuclear fuels. The goal of this work was to identify an LEU design which can maintain the performance of the existing HEU core while continuing to operate safely. A wide variety of design options were considered, with a focus on minimizing peak fuel temperatures and optimizing the powermore » coupling between the TREAT core and test samples. Designs were also evaluated to ensure that they provide sufficient reactivity and shutdown margin for each control rod bank. Analyses were performed using the core loading and experiment configuration of historic M8 Power Calibration experiments (M8CAL). The Monte Carlo code MCNP was utilized for steady-state analyses, and transient calculations were performed with the point kinetics code TREKIN. Thermal analyses were performed with the COMSOL multi-physics code. Using the results of this study, a new LEU Baseline design concept is being established, which will be evaluated in detail in a future report.« less
40 CFR 63.1354 - Reporting requirements.
Code of Federal Regulations, 2012 CFR
2012-07-01
... operator during a startup, shutdown, or malfunction of an affected source (including actions taken to correct a malfunction) are consistent with the procedures specified in the source's startup, shutdown, and... report. Reports shall only be required if a startup, shutdown, or malfunction occurred during the...
Transient Approximation of SAFE-100 Heat Pipe Operation
NASA Technical Reports Server (NTRS)
Bragg-Sitton, Shannon M.; Reid, Robert S.
2005-01-01
Engineers at Los Alamos National Laboratory (LANL) have designed several heat pipe cooled reactor concepts, ranging in power from 15 kWt to 800 kWt, for both surface power systems and nuclear electric propulsion systems. The Safe, Affordable Fission Engine (SAFE) is now being developed in a collaborative effort between LANL and NASA Marshall Space Flight Center (NASA/MSFC). NASA is responsible for fabrication and testing of non-nuclear, electrically heated modules in the Early Flight Fission Test Facility (EFF-TF) at MSFC. In-core heat pipes must be properly thawed as the reactor power starts. Computational models have been developed to assess the expected operation of a specific heat pipe design during start-up, steady state operation, and shutdown. While computationally intensive codes provide complete, detailed analyses of heat pipe thaw, a relatively simple. concise routine can also be applied to approximate the response of a heat pipe to changes in the evaporator heat transfer rate during start-up and power transients (e.g., modification of reactor power level) with reasonably accurate results. This paper describes a simplified model of heat pipe start-up that extends previous work and compares the results to experimental measurements for a SAFE-100 type heat pipe design.
The 2013 US Government Shutdown (#Shutdown) and Health: An Emerging Role for Social Media
Ha, Yoonhee P.; Wong, Charlene A.; Schwartz, H. Andrew; Sap, Maarten; Ungar, Lyle H.; Asch, David A.
2014-01-01
In October 2013, multiple United States (US) federal health departments and agencies posted on Twitter, “We’re sorry, but we will not be tweeting or responding to @replies during the shutdown. We’ll be back as soon as possible!” These “last tweets” and the millions of responses they generated revealed social media’s role as a forum for sharing and discussing information rapidly. Social media are now among the few dominant communication channels used today. We used social media to characterize the public discourse and sentiment about the shutdown. The 2013 shutdown represented an opportunity to explore the role social media might play in events that could affect health. PMID:25322303
40 CFR 68.52 - Operating procedures.
Code of Federal Regulations, 2014 CFR
2014-07-01
...) Initial startup; (2) Normal operations; (3) Temporary operations; (4) Emergency shutdown and operations; (5) Normal shutdown; (6) Startup following a normal or emergency shutdown or a major change that... are updated, if necessary, whenever a major change occurs and prior to startup of the changed process. ...
40 CFR 68.52 - Operating procedures.
Code of Federal Regulations, 2013 CFR
2013-07-01
...) Initial startup; (2) Normal operations; (3) Temporary operations; (4) Emergency shutdown and operations; (5) Normal shutdown; (6) Startup following a normal or emergency shutdown or a major change that... are updated, if necessary, whenever a major change occurs and prior to startup of the changed process. ...
40 CFR 68.52 - Operating procedures.
Code of Federal Regulations, 2012 CFR
2012-07-01
...) Initial startup; (2) Normal operations; (3) Temporary operations; (4) Emergency shutdown and operations; (5) Normal shutdown; (6) Startup following a normal or emergency shutdown or a major change that... are updated, if necessary, whenever a major change occurs and prior to startup of the changed process. ...
40 CFR 68.52 - Operating procedures.
Code of Federal Regulations, 2011 CFR
2011-07-01
...) Initial startup; (2) Normal operations; (3) Temporary operations; (4) Emergency shutdown and operations; (5) Normal shutdown; (6) Startup following a normal or emergency shutdown or a major change that... are updated, if necessary, whenever a major change occurs and prior to startup of the changed process. ...
40 CFR 52.1183 - Visibility protection.
Code of Federal Regulations, 2013 CFR
2013-07-01
... excess emissions that occurs during startups, shutdowns, and malfunctions of the unit, the nature and... that occurs during startups, shutdowns, and malfunctions of the unit, the nature and cause of any... startup, shutdown, and malfunction. (viii) All CEMS required by this section must meet the minimum data...
Characterization of Low-Frequency Combustion Stability of the Fastrac Engine
NASA Technical Reports Server (NTRS)
Rocker, Marvin; Jones, Preston (Technical Monitor)
2002-01-01
A series of tests were conducted to measure the combustion performance of the Fastrac engine thrust chamber. During mainstage, the thrust chamber exhibited no large-amplitude chamber pressure oscillations that could be identified as low-frequency combustion instability or 'chug'. However, during start-up and shutdown, the thrust chamber very briefly exhibited large-amplitude chamber pressure oscillations that were identified as chug. These instabilities during start-up and shutdown were regarded as benign due to their brevity. Linear models of the thrust chamber and the propellant feed systems were formulated for both the thrust chamber component tests and the flight engine tests. These linear models determined the frequency and decay rate of chamber pressure oscillations given the design and operating conditions of the thrust chamber and feed system. The frequency of chamber pressure oscillations determined from the model closely matched the frequency of low-amplitude, low-frequency chamber pressure oscillations exhibited in some of the later thrust chamber mainstage tests. The decay rate of the chamber pressure oscillations determined from the models indicated that these low-frequency oscillations were stable. Likewise, the decay rate, determined from the model of the flight engine tests indicated that the low-frequency chamber pressure oscillations would be stable.
Scoping studies of shielding to reduce the shutdown dose rates in the ITER ports
NASA Astrophysics Data System (ADS)
Juárez, R.; Guirao, J.; Pampin, R.; Loughlin, M.; Polunovskiy, E.; Le Tonqueze, Y.; Bertalot, L.; Kolsek, A.; Ogando, F.; Udintsev, V.; Walsh, M.
2018-07-01
The planned in situ maintenance tasks in the ITER port interspace are fundamental to ensure the operation of equipment to control, evaluate and optimize the plasma performance during the entire facility lifetime. They are subject to a limit of shutdown dose rates (SDDR) of 100 µSv h‑1 after 106 s of cooling time, which is nowadays a design driver for the port plugs as well as the application of ALARA. Three conceptual shielding proposals outside the ITER ports are studied in this work to support the achievement of this objective. Considered one by one, they offer reductions ranging from 25% to 50%, which are rather significant. This paper shows that, by combining these shields, the SDDR as low as 57Δ µSv h‑1 can be achieved with a local approach considering only radiation from one port (no cross-talk form neighboring ports). The locally evaluated SDDR are well below the limit which is an essential pre-requisite for achieving 100µSv h‑1 in a global analysis including all contributions. Further studies will have to deal with a realistic port plug design and the cross-talks from neighbour ports.
76 FR 81998 - Methodology for Low Power/Shutdown Fire PRA
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-29
... NUCLEAR REGULATORY COMMISSION [NRC-2011-0295] Methodology for Low Power/Shutdown Fire PRA AGENCY..., ``Methodology for Low Power/Shutdown Fire PRA--Draft Report for Comment.'' DATES: Submit comments by March 01... risk assessment (PRA) method for quantitatively analyzing fire risk in commercial nuclear power plants...
40 CFR 63.1164 - Reporting requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... written extension of compliance. (c) Periodic startup, shutdown, and malfunction reports. Section 63.6(e... by the standard at all times, including during any period of startup, shutdown, or malfunction...)(3) of subpart A of this part, the owner or operator shall develop a written startup, shutdown, and...
40 CFR 63.2250 - What are the general requirements?
Code of Federal Regulations, 2011 CFR
2011-07-01
... periods of process unit or control device startup, shutdown, and malfunction; prior to process unit initial startup; and during the routine control device maintenance exemption specified in § 63.2251. The... are not operating, or during periods of startup, shutdown, and malfunction. Startup and shutdown...
40 CFR 63.2250 - What are the general requirements?
Code of Federal Regulations, 2010 CFR
2010-07-01
... periods of process unit or control device startup, shutdown, and malfunction; prior to process unit initial startup; and during the routine control device maintenance exemption specified in § 63.2251. The... are not operating, or during periods of startup, shutdown, and malfunction. Startup and shutdown...
40 CFR 63.1164 - Reporting requirements.
Code of Federal Regulations, 2012 CFR
2012-07-01
... written extension of compliance. (c) Periodic startup, shutdown, and malfunction reports. Section 63.6(e... by the standard at all times, including during any period of startup, shutdown, or malfunction...)(3) of subpart A of this part, the owner or operator shall develop a written startup, shutdown, and...
40 CFR 63.1164 - Reporting requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
... written extension of compliance. (c) Periodic startup, shutdown, and malfunction reports. Section 63.6(e... by the standard at all times, including during any period of startup, shutdown, or malfunction...)(3) of subpart A of this part, the owner or operator shall develop a written startup, shutdown, and...
International Space Station Payload Operations Integration Center (POIC) Overview
NASA Technical Reports Server (NTRS)
Ijames, Gayleen N.
2012-01-01
Objectives and Goals: Maintain and operate the POIC and support integrated Space Station command and control functions. Provide software and hardware systems to support ISS payloads and Shuttle for the POIF cadre, Payload Developers and International Partners. Provide design, development, independent verification &validation, configuration, operational product/system deliveries and maintenance of those systems for telemetry, commanding, database and planning. Provide Backup Control Center for MCC-H in case of shutdown. Provide certified personnel and systems to support 24x7 facility operations per ISS Program. Payloads CoFR Implementation Plan (SSP 52054) and MSFC Payload Operations CoFR Implementation Plan (POIF-1006).
46 CFR 111.33-7 - Alarms and shutdowns.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Alarms and shutdowns. 111.33-7 Section 111.33-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-7 Alarms and shutdowns. Each power semiconductor...
46 CFR 111.33-7 - Alarms and shutdowns.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Alarms and shutdowns. 111.33-7 Section 111.33-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-7 Alarms and shutdowns. Each power semiconductor...
46 CFR 111.33-7 - Alarms and shutdowns.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Alarms and shutdowns. 111.33-7 Section 111.33-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-7 Alarms and shutdowns. Each power semiconductor...
46 CFR 111.33-7 - Alarms and shutdowns.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Alarms and shutdowns. 111.33-7 Section 111.33-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-7 Alarms and shutdowns. Each power semiconductor...
40 CFR 52.271 - Malfunction, startup, and shutdown regulations.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Malfunction, startup, and shutdown regulations. 52.271 Section 52.271 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.271 Malfunction, startup, and shutdown regulations. (a)...
40 CFR 52.271 - Malfunction, startup, and shutdown regulations.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 3 2011-07-01 2011-07-01 false Malfunction, startup, and shutdown regulations. 52.271 Section 52.271 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.271 Malfunction, startup, and shutdown regulations. (a)...
40 CFR 52.271 - Malfunction, startup, and shutdown regulations.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 3 2013-07-01 2013-07-01 false Malfunction, startup, and shutdown regulations. 52.271 Section 52.271 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.271 Malfunction, startup, and shutdown regulations. (a)...
40 CFR 52.271 - Malfunction, startup, and shutdown regulations.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 3 2012-07-01 2012-07-01 false Malfunction, startup, and shutdown regulations. 52.271 Section 52.271 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.271 Malfunction, startup, and shutdown regulations. (a)...
40 CFR 52.271 - Malfunction, startup, and shutdown regulations.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 3 2014-07-01 2014-07-01 false Malfunction, startup, and shutdown regulations. 52.271 Section 52.271 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.271 Malfunction, startup, and shutdown regulations. (a)...
77 FR 10576 - Methodology for Low Power/Shutdown Fire PRA
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-22
... NUCLEAR REGULATORY COMMISSION [NRC-2011-0295] Methodology for Low Power/Shutdown Fire PRA AGENCY.../Shutdown Fire PRA.'' In response to request from members of the public, the NRC is extending the public... risk assessment (PRA) method for quantitatively analyzing fire risk in commercial nuclear power plants...
40 CFR 65.6 - Startup, shutdown, and malfunction plan and procedures.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 15 2011-07-01 2011-07-01 false Startup, shutdown, and malfunction... (CONTINUED) AIR PROGRAMS (CONTINUED) CONSOLIDATED FEDERAL AIR RULE General Provisions § 65.6 Startup... Group 2A or Group 2B process vents. (b) Startup, shutdown, and malfunction plan—(1) Description and...
40 CFR 65.6 - Startup, shutdown, and malfunction plan and procedures.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 15 2010-07-01 2010-07-01 false Startup, shutdown, and malfunction... (CONTINUED) AIR PROGRAMS (CONTINUED) CONSOLIDATED FEDERAL AIR RULE General Provisions § 65.6 Startup... Group 2A or Group 2B process vents. (b) Startup, shutdown, and malfunction plan—(1) Description and...
40 CFR 65.6 - Startup, shutdown, and malfunction plan and procedures.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 16 2014-07-01 2014-07-01 false Startup, shutdown, and malfunction... (CONTINUED) AIR PROGRAMS (CONTINUED) CONSOLIDATED FEDERAL AIR RULE General Provisions § 65.6 Startup... Group 2A or Group 2B process vents. (b) Startup, shutdown, and malfunction plan—(1) Description and...
40 CFR 60.3025 - What happens during periods of startup, shutdown, and malfunction?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 6 2010-07-01 2010-07-01 false What happens during periods of startup... during periods of startup, shutdown, and malfunction? The emission limitations and operating limits apply at all times except during OSWI unit startups, shutdowns, or malfunctions. Model Rule—Performance...
40 CFR 60.3025 - What happens during periods of startup, shutdown, and malfunction?
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 7 2014-07-01 2014-07-01 false What happens during periods of startup... during periods of startup, shutdown, and malfunction? The emission limitations and operating limits apply at all times except during OSWI unit startups, shutdowns, or malfunctions. Model Rule—Performance...
40 CFR Table 15 to Subpart Xxxx of... - Requirements for Reports
Code of Federal Regulations, 2011 CFR
2011-07-01
... had a startup, shutdown or malfunction during the reporting period and you took actions consistent with your startup, shutdown, and malfunction plan, the compliance report must include the information... requirements for annual reporting in § 63.6010(f). 2. Immediate startup, shutdown, and malfunction report if...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-08
... SIP Calls To Amend Provisions Applying to Excess Emissions During Periods of Startup, Shutdown, and... SIP Calls to Amend Provisions Applying to Excess Emissions During Periods of Startup, Shutdown, and... Amend Provisions Applying to Excess Emissions During Periods of Startup, Shutdown, and Malfunction...
40 CFR 65.6 - Startup, shutdown, and malfunction plan and procedures.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 16 2012-07-01 2012-07-01 false Startup, shutdown, and malfunction... (CONTINUED) AIR PROGRAMS (CONTINUED) CONSOLIDATED FEDERAL AIR RULE General Provisions § 65.6 Startup... Group 2A or Group 2B process vents. (b) Startup, shutdown, and malfunction plan—(1) Description and...
40 CFR 65.6 - Startup, shutdown, and malfunction plan and procedures.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 16 2013-07-01 2013-07-01 false Startup, shutdown, and malfunction... (CONTINUED) AIR PROGRAMS (CONTINUED) CONSOLIDATED FEDERAL AIR RULE General Provisions § 65.6 Startup... Group 2A or Group 2B process vents. (b) Startup, shutdown, and malfunction plan—(1) Description and...
40 CFR 60.3025 - What happens during periods of startup, shutdown, and malfunction?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 7 2012-07-01 2012-07-01 false What happens during periods of startup... during periods of startup, shutdown, and malfunction? The emission limitations and operating limits apply at all times except during OSWI unit startups, shutdowns, or malfunctions. Model Rule—Performance...
40 CFR 60.3025 - What happens during periods of startup, shutdown, and malfunction?
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 7 2013-07-01 2013-07-01 false What happens during periods of startup... during periods of startup, shutdown, and malfunction? The emission limitations and operating limits apply at all times except during OSWI unit startups, shutdowns, or malfunctions. Model Rule—Performance...
40 CFR 60.3025 - What happens during periods of startup, shutdown, and malfunction?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 6 2011-07-01 2011-07-01 false What happens during periods of startup... during periods of startup, shutdown, and malfunction? The emission limitations and operating limits apply at all times except during OSWI unit startups, shutdowns, or malfunctions. Model Rule—Performance...
40 CFR 63.8635 - What reports must I submit and when?
Code of Federal Regulations, 2012 CFR
2012-07-01
... of report and beginning and ending dates of the reporting period. (4) If you had a startup, shutdown... section. This includes periods of startup, shutdown, malfunction, and routine control device maintenance... (e)(1) through (13) of this section. This includes periods of startup, shutdown, malfunction, and...
40 CFR 63.10 - Recordkeeping and reporting requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
... relevant records for such source of— (i) The occurrence and duration of each startup or shutdown when the startup or shutdown causes the source to exceed any applicable emission limitation in the relevant... startup or shutdown when the source exceeded applicable emission limitations in a relevant standard and...
40 CFR 63.1367 - Recordkeeping requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
...) of subpart A of this part. (3) Startup, shutdown, and malfunction plan. The owner or operator of an affected source shall develop a written startup, shutdown, and malfunction plan as specified in § 63.6(e)(3... during periods of startup, shutdown, and malfunction and a program for corrective action for a...
40 CFR 63.10 - Recordkeeping and reporting requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
... relevant records for such source of— (i) The occurrence and duration of each startup or shutdown when the startup or shutdown causes the source to exceed any applicable emission limitation in the relevant... startup or shutdown when the source exceeded applicable emission limitations in a relevant standard and...
40 CFR 63.8635 - What reports must I submit and when?
Code of Federal Regulations, 2013 CFR
2013-07-01
... of report and beginning and ending dates of the reporting period. (4) If you had a startup, shutdown... section. This includes periods of startup, shutdown, malfunction, and routine control device maintenance... (e)(1) through (13) of this section. This includes periods of startup, shutdown, malfunction, and...
40 CFR 63.1346 - Operating limits for kilns.
Code of Federal Regulations, 2013 CFR
2013-07-01
..., is not exceeded, except during periods of startup and shutdown when the temperature limit may be... not exceeded, except during periods of startup/shutdown when the temperature limit may be exceeded by... periods of startup/shutdown when the temperature limit may be exceeded by no more than 10 percent. (b) The...
40 CFR 63.10 - Recordkeeping and reporting requirements.
Code of Federal Regulations, 2012 CFR
2012-07-01
... relevant records for such source of— (i) The occurrence and duration of each startup or shutdown when the startup or shutdown causes the source to exceed any applicable emission limitation in the relevant... startup or shutdown when the source exceeded applicable emission limitations in a relevant standard and...
40 CFR 63.10 - Recordkeeping and reporting requirements.
Code of Federal Regulations, 2014 CFR
2014-07-01
... relevant records for such source of— (i) The occurrence and duration of each startup or shutdown when the startup or shutdown causes the source to exceed any applicable emission limitation in the relevant... startup or shutdown when the source exceeded applicable emission limitations in a relevant standard and...
40 CFR 63.8635 - What reports must I submit and when?
Code of Federal Regulations, 2014 CFR
2014-07-01
... of report and beginning and ending dates of the reporting period. (4) If you had a startup, shutdown... section. This includes periods of startup, shutdown, malfunction, and routine control device maintenance... (e)(1) through (13) of this section. This includes periods of startup, shutdown, malfunction, and...
40 CFR 63.1346 - Operating limits for kilns.
Code of Federal Regulations, 2014 CFR
2014-07-01
..., is not exceeded, except during periods of startup and shutdown when the temperature limit may be... not exceeded, except during periods of startup/shutdown when the temperature limit may be exceeded by... periods of startup/shutdown when the temperature limit may be exceeded by no more than 10 percent. (b) The...
40 CFR 63.8635 - What reports must I submit and when?
Code of Federal Regulations, 2011 CFR
2011-07-01
... of report and beginning and ending dates of the reporting period. (4) If you had a startup, shutdown... section. This includes periods of startup, shutdown, malfunction, and routine control device maintenance... (e)(1) through (13) of this section. This includes periods of startup, shutdown, malfunction, and...
Leeper, Christine M; Neal, Matthew D; McKenna, Christine J; Gaines, Barbara A
2017-09-01
To trend fibrinolysis after injury and determine the influence of traumatic brain injury (TBI) and massive transfusion on fibrinolysis status. Admission fibrinolytic derangement is common in injured children and adults, and is associated with poor outcome. No studies examine fibrinolysis days after injury. Prospective study of severely injured children at a level 1 pediatric trauma center. Rapid thromboelastography was obtained on admission and daily for up to 7 days. Standard definitions of hyperfibrinolysis (HF; LY30 ≥3), fibrinolysis shutdown (SD; LY30 ≤0.8), and normal (LY30 = 0.9-2.9) were applied. Antifibrinolytic use was documented. Outcomes were death, disability, and thromboembolic complications. Wilcoxon rank-sum and Fisher exact tests were performed. Exploratory subgroups included massively transfused and severe TBI patients. In all, 83 patients were analyzed with median (interquartile ranges) age 8 (4-12) and Injury Severity Score 22 (13-34), 73.5% blunt mechanism, 47% severe TBI, 20.5% massively transfused. Outcomes were 14.5% mortality, 43.7% disability, and 9.8% deep vein thrombosis. Remaining in or trending to SD was associated with death (P = 0.007), disability (P = 0.012), and deep vein thrombosis (P = 0.048). Median LY30 was lower on post-trauma day (PTD)1 to PTD4 in patients with poor compared with good outcome; median LY30 was lower on PTD1 to PTD3 in TBI patients compared with non-TBI patients. HF without associated shutdown was not related to poor outcome, but extreme HF (LY30 >30%, n = 3) was lethal. Also, 50% of massively transfused patients in hemorrhagic shock demonstrated SD physiology on admission. All with HF (fc31.2%) corrected after hemostatic resuscitation without tranexamic acid. Fibrinolysis shutdown is common postinjury and predicts poor outcomes. Severe TBI is associated with sustained shutdown. Empiric antifibrinolytics for children should be questioned; thromboelastography-directed selective use should be considered for documented HF.
Summary of Part 75 Administrative Processes: Table 6
Learn how to submit information for a new unit, new stack or new FGD; unit shutdown and restart, long term cold storage (LTCS), expected restart date, postponement of Appendix E testing, backup fuel used, and notice of combustion of emergency fuel.
Burnable absorber arrangement for fuel bundle
DOE Office of Scientific and Technical Information (OSTI.GOV)
Crowther, R.L.; Townsend, D.B.
1986-12-16
This patent describes a boiling water reactor core whose operation is characterized by a substantial proportion of steam voids with concomitantly reduced moderation toward the top of the core when the reactor is in its hot operating condition. The reduced moderation leads to slower burnup and greater conversion ratio in an upper core region so that when the reactor is in its cold shut down condition the resulting relatively increased moderation in the upper core region is accompanied by a reactivity profile that peaks in the upper core region. A fuel assembly is described comprising; a component of fissile materialmore » distributed over a substantial axial extent of the fuel assembly; and a component of neutron absorbing material having an axial distribution characterized by an enhancement in an axial zone of the fuel assembly, designated the cold shutdown control zone, corresponding to at least a portion of the axial region of the core when the cold shutdown reactivity peaks. The aggregate amount of neutron absorbing material in the cold shutdown zone of the fuel assembly is greater than the aggregate amount of neutron absorbing material in the axial zones of the fuel assembly immediately above and immediately below the cold shutdown control zone whereby the cold shutdown reactivity peak is reduced relative to the cold shutdown reactivity in the zones immediately above and immediately below the cold shutdown control zone. The cold shutdown zone has an axial extent measured from the bottom of the fuel assembly in the range between 68-88 percent of the height of the fissile material in the fuel assembly.« less
30 CFR 57.8534 - Shutdown or failure of auxiliary fans.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Shutdown or failure of auxiliary fans. 57.8534... Ventilation Underground Only § 57.8534 Shutdown or failure of auxiliary fans. (a) Auxiliary fans installed and... fan maintenance or fan adjustments where air quality is maintained in compliance with the applicable...
76 FR 20707 - Notice of Possible Shutdown of Investigative Activities
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-13
... receives funding and the period of the shutdown ends, all schedules will resume starting with the day on... if the Commission resumes operations by April 14, 2011. Should the shutdown not end before April 14.... The Commission's World Wide Web site, at http://www.usitc.gov , will be updated to the extent...
40 CFR Table 14 to Subpart Wwww of... - Requirements for Reports
Code of Federal Regulations, 2010 CFR
2010-07-01
....5910(b). c. The information in § 63.10(d)(5)(i) if you had a startup, shutdown or malfunction during the reporting period, and you took actions consistent with your startup, shutdown, and malfunction plan Semiannually according to the requirements in § 63.5910(b). 2. An immediate startup, shutdown, and...
40 CFR Table 7 to Subpart Aaaaa of... - Requirements for Reports
Code of Federal Regulations, 2011 CFR
2011-07-01
.... If you had a startup, shutdown or malfunction during the reporting period and you took actions...) Semiannually according to the requirements in § 63.7131(b). 2. An immediate startup, shutdown, and malfunction report if you had a startup, shutdown, or malfunction during the reporting period that is not consistent...
40 CFR Table 7 to Subpart Aaaaa of... - Requirements for Reports
Code of Federal Regulations, 2012 CFR
2012-07-01
.... If you had a startup, shutdown or malfunction during the reporting period and you took actions...) Semiannually according to the requirements in § 63.7131(b). 2. An immediate startup, shutdown, and malfunction report if you had a startup, shutdown, or malfunction during the reporting period that is not consistent...
40 CFR Table 7 to Subpart Aaaaa of... - Requirements for Reports
Code of Federal Regulations, 2010 CFR
2010-07-01
.... If you had a startup, shutdown or malfunction during the reporting period and you took actions...) Semiannually according to the requirements in § 63.7131(b). 2. An immediate startup, shutdown, and malfunction report if you had a startup, shutdown, or malfunction during the reporting period that is not consistent...
40 CFR 60.2685 - What happens during periods of startup, shutdown, and malfunction?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 6 2010-07-01 2010-07-01 false What happens during periods of startup... happens during periods of startup, shutdown, and malfunction? (a) The emission limitations and operating limits apply at all times except during CISWI unit startups, shutdowns, or malfunctions. (b) Each...
40 CFR 63.1570 - What are my general requirements for complying with this subpart?
Code of Federal Regulations, 2013 CFR
2013-07-01
... control equipment. (d) You must develop a written startup, shutdown, and malfunction plan (SSMP) according... includes periods of startup, shutdown, and malfunction. You also must report each instance in which you did...), deviations that occur during a period of startup, shutdown, or malfunction are not violations if you...
40 CFR 60.2685 - What happens during periods of startup, shutdown, and malfunction?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 6 2011-07-01 2011-07-01 false What happens during periods of startup... happens during periods of startup, shutdown, and malfunction? (a) The emission limitations and operating limits apply at all times except during CISWI unit startups, shutdowns, or malfunctions. (b) Each...
Code of Federal Regulations, 2011 CFR
2011-07-01
... startup, shutdown, and malfunction. These instances are deviations from the emission limits, operating... during a period of startup, shutdown, or malfunction are not violations if you demonstrate to the... determine whether deviations that occur during a period you identify as a startup, shutdown, or malfunction...
40 CFR Table 14 to Subpart Wwww of... - Requirements for Reports
Code of Federal Regulations, 2011 CFR
2011-07-01
....5910(b). c. The information in § 63.10(d)(5)(i) if you had a startup, shutdown or malfunction during the reporting period, and you took actions consistent with your startup, shutdown, and malfunction plan Semiannually according to the requirements in § 63.5910(b). 2. An immediate startup, shutdown, and...
Code of Federal Regulations, 2011 CFR
2011-07-01
... to you. This includes periods of startup, shutdown, and malfunction. These instances are deviations... during a period of startup, shutdown, or malfunction are not violations if you demonstrate to the... determine whether deviations that occur during a period of startup, shutdown, or malfunction are violations...
40 CFR Table 7 to Subpart Aaaaa of... - Requirements for Reports
Code of Federal Regulations, 2013 CFR
2013-07-01
.... If you had a startup, shutdown or malfunction during the reporting period and you took actions...) Semiannually according to the requirements in § 63.7131(b). 2. An immediate startup, shutdown, and malfunction report if you had a startup, shutdown, or malfunction during the reporting period that is not consistent...
Code of Federal Regulations, 2010 CFR
2010-07-01
... startup, shutdown, and malfunction. These instances are deviations from the emission limits, operating... during a period of startup, shutdown, or malfunction are not violations if you demonstrate to the... determine whether deviations that occur during a period you identify as a startup, shutdown, or malfunction...
40 CFR 63.1570 - What are my general requirements for complying with this subpart?
Code of Federal Regulations, 2014 CFR
2014-07-01
... control equipment. (d) You must develop a written startup, shutdown, and malfunction plan (SSMP) according... includes periods of startup, shutdown, and malfunction. You also must report each instance in which you did...), deviations that occur during a period of startup, shutdown, or malfunction are not violations if you...
40 CFR 63.1570 - What are my general requirements for complying with this subpart?
Code of Federal Regulations, 2010 CFR
2010-07-01
... control equipment. (d) You must develop a written startup, shutdown, and malfunction plan (SSMP) according... includes periods of startup, shutdown, and malfunction. You also must report each instance in which you did...), deviations that occur during a period of startup, shutdown, or malfunction are not violations if you...
40 CFR 60.2685 - What happens during periods of startup, shutdown, and malfunction?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 7 2012-07-01 2012-07-01 false What happens during periods of startup...-Emission Limitations and Operating Limits § 60.2685 What happens during periods of startup, shutdown, and... startups, shutdowns, or malfunctions. (b) Each malfunction must last no longer than 3 hours. Effective Date...
40 CFR Table 7 to Subpart Aaaaa of... - Requirements for Reports
Code of Federal Regulations, 2014 CFR
2014-07-01
.... If you had a startup, shutdown or malfunction during the reporting period and you took actions...) Semiannually according to the requirements in § 63.7131(b). 2. An immediate startup, shutdown, and malfunction report if you had a startup, shutdown, or malfunction during the reporting period that is not consistent...
40 CFR 63.1570 - What are my general requirements for complying with this subpart?
Code of Federal Regulations, 2011 CFR
2011-07-01
... control equipment. (d) You must develop a written startup, shutdown, and malfunction plan (SSMP) according... includes periods of startup, shutdown, and malfunction. You also must report each instance in which you did...), deviations that occur during a period of startup, shutdown, or malfunction are not violations if you...
40 CFR Table 15 to Subpart Xxxx of... - Requirements for Reports
Code of Federal Regulations, 2013 CFR
2013-07-01
....6010(f). c. If you had a startup, shutdown or malfunction during the reporting period and you took actions consistent with your startup, shutdown, and malfunction plan, the compliance report must include... you meet the requirements for annual reporting in § 63.6010(f). 2. Immediate startup, shutdown, and...
40 CFR 63.1570 - What are my general requirements for complying with this subpart?
Code of Federal Regulations, 2012 CFR
2012-07-01
... control equipment. (d) You must develop a written startup, shutdown, and malfunction plan (SSMP) according... includes periods of startup, shutdown, and malfunction. You also must report each instance in which you did...), deviations that occur during a period of startup, shutdown, or malfunction are not violations if you...
40 CFR 63.9641 - What reports must I submit and when?
Code of Federal Regulations, 2014 CFR
2014-07-01
... and ending dates of the reporting period. (4) If you had a startup, shutdown, or malfunction during the reporting period and you took actions consistent with your startup, shutdown, and malfunction plan... information in paragraphs (b)(7)(i) and (ii) of this section. This includes periods of startup, shutdown, and...
40 CFR 63.9814 - What reports must I submit and when?
Code of Federal Regulations, 2011 CFR
2011-07-01
... beginning and ending dates of the reporting period. (4) If you had a startup, shutdown, or malfunction... (d)(1) and (2) of this section. This includes periods of startup, shutdown, and malfunction. (1) The... section. This includes periods of startup, shutdown, and malfunction. (1) The total operating time of each...
40 CFR 63.9814 - What reports must I submit and when?
Code of Federal Regulations, 2012 CFR
2012-07-01
... beginning and ending dates of the reporting period. (4) If you had a startup, shutdown, or malfunction... (d)(1) and (2) of this section. This includes periods of startup, shutdown, and malfunction. (1) The... section. This includes periods of startup, shutdown, and malfunction. (1) The total operating time of each...
40 CFR 63.9641 - What reports must I submit and when?
Code of Federal Regulations, 2012 CFR
2012-07-01
... and ending dates of the reporting period. (4) If you had a startup, shutdown, or malfunction during the reporting period and you took actions consistent with your startup, shutdown, and malfunction plan... information in paragraphs (b)(7)(i) and (ii) of this section. This includes periods of startup, shutdown, and...
40 CFR 63.9814 - What reports must I submit and when?
Code of Federal Regulations, 2014 CFR
2014-07-01
... beginning and ending dates of the reporting period. (4) If you had a startup, shutdown, or malfunction... (d)(1) and (2) of this section. This includes periods of startup, shutdown, and malfunction. (1) The... section. This includes periods of startup, shutdown, and malfunction. (1) The total operating time of each...
40 CFR 63.9641 - What reports must I submit and when?
Code of Federal Regulations, 2013 CFR
2013-07-01
... and ending dates of the reporting period. (4) If you had a startup, shutdown, or malfunction during the reporting period and you took actions consistent with your startup, shutdown, and malfunction plan... information in paragraphs (b)(7)(i) and (ii) of this section. This includes periods of startup, shutdown, and...
40 CFR 63.9641 - What reports must I submit and when?
Code of Federal Regulations, 2011 CFR
2011-07-01
... and ending dates of the reporting period. (4) If you had a startup, shutdown, or malfunction during the reporting period and you took actions consistent with your startup, shutdown, and malfunction plan... information in paragraphs (b)(7)(i) and (ii) of this section. This includes periods of startup, shutdown, and...
40 CFR 63.9814 - What reports must I submit and when?
Code of Federal Regulations, 2013 CFR
2013-07-01
... beginning and ending dates of the reporting period. (4) If you had a startup, shutdown, or malfunction... (d)(1) and (2) of this section. This includes periods of startup, shutdown, and malfunction. (1) The... section. This includes periods of startup, shutdown, and malfunction. (1) The total operating time of each...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-19
..., ``Revise Shutdown Margin Definition To Address Advanced Fuel Designs'' AGENCY: Nuclear Regulatory... Shutdown Margin Definition to Address Advanced Fuel Designs.'' DATES: Comment period expires on December 19... address newer BWR fuel designs, which may be more reactive at shutdown temperatures above 68[emsp14][deg]F...
Transfusion under triple threat: Lessons from Japan's 2011 earthquake, tsunami, and nuclear crisis.
Nollet, Kenneth E; Komazawa, Tomoko; Ohto, Hitoshi
2016-10-01
The Great East Japan Earthquake of March 11, 2011 provoked tsunami waves with inland penetration up to 5 km and run-up heights to 40 m. More than 400 km 2 were flooded, mainly along the northeast coast of Japan's largest island, Honshu. Nearly 20,000 human lives were abruptly taken by this natural disaster. Four coastal nuclear facilities went into automatic shutdown; at one, Fukushima Daiichi, cooling system failures resulted in the meltdown of three reactor cores, accompanied by explosive release of radioisotopes. Essentials of modern blood banking and transfusion medicine were lost: roads, vehicles, blood collection venues, and facilities for blood testing and processing. Normal channels of communication were interrupted, not only by physical damage but also due to circuit overload as mobile phone users sought information and tried to exchange messages about their own and others' health, welfare, and whereabouts. The Japanese Red Cross, as a monopoly supplier of allogeneic blood, responded with a nationally coordinated effort that met the transfusion demands of a disaster characterized by immediate mass fatality rather than mass injury. Japan's routine transfusion demands are also met by hospital-based autologous blood programs, which could be pressed into service for emergency allogeneic collections. Herein we report institutional and personal experience in anticipation of future disasters, in which transfusion needs might differ from routine demand. Copyright © 2016 Elsevier Ltd. All rights reserved.
Characterization of microporous separators for lithium-ion batteries
NASA Astrophysics Data System (ADS)
Venugopal, Ganesh; Moore, John; Howard, Jason; Pendalwar, Shekhar
Several properties including porosity, pore-size distribution, thickness value, electrochemical stability and mechanical properties have to be optimized before a membrane can qualify as a separator for a lithium-ion battery. In this paper we present results of characterization studies carried out on some commercially available lithium-ion battery separators. The relevance of these results to battery performance and safety are also discussed. Porosity values were measured using a simple liquid absorption test and gas permeabilities were measured using a novel pressure drop technique that is similar in principle to the Gurley test. For separators from one particular manufacturer, the trend observed in the pressure drop times was found to be in agreement with the Gurley numbers reported by the separator manufacturer. Shutdown characteristics of the separators were studied by measuring the impedance of batteries containing the separators as a function of temperature. Overcharge tests were also performed to confirm that separator shutdown is indeed a useful mechanism for preventing thermal runaway situations. Polyethylene containing separators, in particular trilayer laminates of polypropylene, polyethylene and polypropylene, appear to have the most attractive properties for preventing thermal runaway in lithium ion cells.
40 CFR 63.9565 - What definitions apply to this subpart?
Code of Federal Regulations, 2013 CFR
2013-07-01
... limitation (including any operating limit) in this subpart during startup, shutdown, or malfunction.... Examples include hexane, toluene, and trichloroethylene. Initial startup means the first time that equipment is put into operation. Initial startup does not include operation solely for testing equipment...
40 CFR 63.9565 - What definitions apply to this subpart?
Code of Federal Regulations, 2012 CFR
2012-07-01
... limitation (including any operating limit) in this subpart during startup, shutdown, or malfunction.... Examples include hexane, toluene, and trichloroethylene. Initial startup means the first time that equipment is put into operation. Initial startup does not include operation solely for testing equipment...
40 CFR 63.9565 - What definitions apply to this subpart?
Code of Federal Regulations, 2014 CFR
2014-07-01
... limitation (including any operating limit) in this subpart during startup, shutdown, or malfunction.... Examples include hexane, toluene, and trichloroethylene. Initial startup means the first time that equipment is put into operation. Initial startup does not include operation solely for testing equipment...
40 CFR 63.9565 - What definitions apply to this subpart?
Code of Federal Regulations, 2011 CFR
2011-07-01
... limitation (including any operating limit) in this subpart during startup, shutdown, or malfunction.... Examples include hexane, toluene, and trichloroethylene. Initial startup means the first time that equipment is put into operation. Initial startup does not include operation solely for testing equipment...
40 CFR 63.8445 - How do I conduct performance tests and establish operating limits?
Code of Federal Regulations, 2012 CFR
2012-07-01
... startup, shutdown, or malfunction, as specified in § 63.7(e)(1). (f) You must conduct at least three... changes. (ii) The type of monitoring device or procedure that will be used. (iii) The operating parameters...
SNAP 10A FS-3 reactor performance
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hawley, J.P.; Johnson, R.A.
1966-08-15
SNAP 10FS-3 was the first flight-qualified SNAP reactor system to be operated in a simulated space environment. Prestart-up qualification testing, automatic start-up, endurance period performance, extended operation test and reactor shutdown are described as they affected, or were affected by, overall reactor performance. Performance of the reactor control system and the diagnostic instrumentation is critically evaluted.
40 CFR 63.8248 - What other requirements must I meet?
Code of Federal Regulations, 2011 CFR
2011-07-01
... startup, shutdown, and malfunction. (2) You must report each instance in which you did not meet each work practice standard in § 63.8192 that applies to you. This includes periods of startup, shutdown, and... value was out of range. (b) Startups, shutdowns, and malfunctions. (1) Consistent with §§ 63.6(e) and 63...
Code of Federal Regulations, 2014 CFR
2014-07-01
... periods of startup, shutdown, and malfunction. These instances are deviations from the emission limits...), deviations that occur during a period of startup, shutdown, or malfunction are not violations if you... Administrator will determine whether deviations that occur during a period you identify as a startup, shutdown...
40 CFR 63.8248 - What other requirements must I meet?
Code of Federal Regulations, 2013 CFR
2013-07-01
... startup, shutdown, and malfunction. (2) You must report each instance in which you did not meet each work practice standard in § 63.8192 that applies to you. This includes periods of startup, shutdown, and... value was out of range. (b) Startups, shutdowns, and malfunctions. (1) Consistent with §§ 63.6(e) and 63...
Code of Federal Regulations, 2013 CFR
2013-07-01
... periods of startup, shutdown, and malfunction. These instances are deviations from the emission limits...), deviations that occur during a period of startup, shutdown, or malfunction are not violations if you... Administrator will determine whether deviations that occur during a period you identify as a startup, shutdown...
40 CFR Table 1 to Subpart Aaaa of... - Applicability of NESHAP General Provisions to Subpart AAAA
Code of Federal Regulations, 2010 CFR
2010-07-01
... reconstructed sources 63.6(e) Operation and maintenance requirements, startup, shutdown and malfunction plan...(b)(2)(i)-(b)(2)(v) General recordkeeping requirements 63.10(d)(5) If actions taken during a startup, shutdown and malfunction plan are consistent with the procedures in the startup, shutdown and malfunction...
40 CFR 62.14645 - What happens during periods of startup, shutdown, and malfunction?
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 9 2013-07-01 2013-07-01 false What happens during periods of startup... Limits § 62.14645 What happens during periods of startup, shutdown, and malfunction? (a) The emission limitations and operating limits apply at all times except during periods of CISWI unit startup, shutdown, or...
40 CFR 63.7835 - What other requirements must I meet to demonstrate continuous compliance?
Code of Federal Regulations, 2010 CFR
2010-07-01
... that applies to you. This includes periods of startup, shutdown, and malfunction. You also must report...) Startups, shutdowns, and malfunctions. (1) Consistent with §§ 63.6(e) and 63.7(e)(1), deviations that occur during a period of startup, shutdown, or malfunction are not violations if you demonstrate to the...
40 CFR 62.14645 - What happens during periods of startup, shutdown, and malfunction?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 8 2010-07-01 2010-07-01 false What happens during periods of startup... Limits § 62.14645 What happens during periods of startup, shutdown, and malfunction? (a) The emission limitations and operating limits apply at all times except during periods of CISWI unit startup, shutdown, or...
40 CFR 63.7835 - What other requirements must I meet to demonstrate continuous compliance?
Code of Federal Regulations, 2012 CFR
2012-07-01
... that applies to you. This includes periods of startup, shutdown, and malfunction. You also must report...) Startups, shutdowns, and malfunctions. (1) Consistent with §§ 63.6(e) and 63.7(e)(1), deviations that occur during a period of startup, shutdown, or malfunction are not violations if you demonstrate to the...
40 CFR 63.8248 - What other requirements must I meet?
Code of Federal Regulations, 2014 CFR
2014-07-01
... startup, shutdown, and malfunction. (2) You must report each instance in which you did not meet each work practice standard in § 63.8192 that applies to you. This includes periods of startup, shutdown, and... value was out of range. (b) Startups, shutdowns, and malfunctions. (1) Consistent with §§ 63.6(e) and 63...
40 CFR 62.14645 - What happens during periods of startup, shutdown, and malfunction?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 9 2012-07-01 2012-07-01 false What happens during periods of startup... Limits § 62.14645 What happens during periods of startup, shutdown, and malfunction? (a) The emission limitations and operating limits apply at all times except during periods of CISWI unit startup, shutdown, or...
40 CFR 62.14645 - What happens during periods of startup, shutdown, and malfunction?
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 9 2014-07-01 2014-07-01 false What happens during periods of startup... Limits § 62.14645 What happens during periods of startup, shutdown, and malfunction? (a) The emission limitations and operating limits apply at all times except during periods of CISWI unit startup, shutdown, or...
40 CFR Table 14 to Subpart Wwww of... - Requirements for Reports
Code of Federal Regulations, 2013 CFR
2013-07-01
... requirements in § 63.5910(b). c. The information in § 63.10(d)(5)(i) if you had a startup, shutdown or malfunction during the reporting period, and you took actions consistent with your startup, shutdown, and malfunction plan Semiannually according to the requirements in § 63.5910(b). 2. An immediate startup, shutdown...
40 CFR Table 14 to Subpart Wwww of... - Requirements for Reports
Code of Federal Regulations, 2012 CFR
2012-07-01
... requirements in § 63.5910(b). c. The information in § 63.10(d)(5)(i) if you had a startup, shutdown or malfunction during the reporting period, and you took actions consistent with your startup, shutdown, and malfunction plan Semiannually according to the requirements in § 63.5910(b). 2. An immediate startup, shutdown...
40 CFR 62.14645 - What happens during periods of startup, shutdown, and malfunction?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 8 2011-07-01 2011-07-01 false What happens during periods of startup... Limits § 62.14645 What happens during periods of startup, shutdown, and malfunction? (a) The emission limitations and operating limits apply at all times except during periods of CISWI unit startup, shutdown, or...
40 CFR 63.7835 - What other requirements must I meet to demonstrate continuous compliance?
Code of Federal Regulations, 2013 CFR
2013-07-01
... that applies to you. This includes periods of startup, shutdown, and malfunction. You also must report...) Startups, shutdowns, and malfunctions. (1) Consistent with §§ 63.6(e) and 63.7(e)(1), deviations that occur during a period of startup, shutdown, or malfunction are not violations if you demonstrate to the...
40 CFR Table 14 to Subpart Wwww of... - Requirements for Reports
Code of Federal Regulations, 2014 CFR
2014-07-01
... requirements in § 63.5910(b). c. The information in § 63.10(d)(5)(i) if you had a startup, shutdown or malfunction during the reporting period, and you took actions consistent with your startup, shutdown, and malfunction plan Semiannually according to the requirements in § 63.5910(b). 2. An immediate startup, shutdown...
40 CFR Table 1 to Subpart Aaaa of... - Applicability of NESHAP General Provisions to Subpart AAAA
Code of Federal Regulations, 2011 CFR
2011-07-01
... reconstructed sources 63.6(e) Operation and maintenance requirements, startup, shutdown and malfunction plan...(b)(2)(i)-(b)(2)(v) General recordkeeping requirements 63.10(d)(5) If actions taken during a startup, shutdown and malfunction plan are consistent with the procedures in the startup, shutdown and malfunction...
Code of Federal Regulations, 2012 CFR
2012-07-01
... periods of startup, shutdown, and malfunction. These instances are deviations from the emission limits...), deviations that occur during a period of startup, shutdown, or malfunction are not violations if you... Administrator will determine whether deviations that occur during a period you identify as a startup, shutdown...
40 CFR 63.7835 - What other requirements must I meet to demonstrate continuous compliance?
Code of Federal Regulations, 2014 CFR
2014-07-01
... that applies to you. This includes periods of startup, shutdown, and malfunction. You also must report...) Startups, shutdowns, and malfunctions. (1) Consistent with §§ 63.6(e) and 63.7(e)(1), deviations that occur during a period of startup, shutdown, or malfunction are not violations if you demonstrate to the...
40 CFR 63.7835 - What other requirements must I meet to demonstrate continuous compliance?
Code of Federal Regulations, 2011 CFR
2011-07-01
... that applies to you. This includes periods of startup, shutdown, and malfunction. You also must report...) Startups, shutdowns, and malfunctions. (1) Consistent with §§ 63.6(e) and 63.7(e)(1), deviations that occur during a period of startup, shutdown, or malfunction are not violations if you demonstrate to the...
Defense.gov Special Report: Government Shutdown - What You Need to Know
Department is taking to plan for a possible government shutdown. Document Plan for Agency Operations During agencies should plan for a potential shutdown. Document Guidance for Continuation of Operations in The Contingency Plan Guidance for Continuation of Essential Operations in the Absence of Available Appropriations
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-10
... self- reporting of events that PBGC now learns of only through its own investigations and may enable... to retire sooner upon learning of a shutdown that would eliminate her job, the separation would be the result of the shutdown; whereas if (before learning of the shutdown) she had been planning to...
Fuel cell system shutdown with anode pressure control
Clingerman, Bruce J.; Doan, Tien M.; Keskula, Donald H.
2002-01-01
A venting methodology and pressure sensing and vent valving arrangement for monitoring anode bypass valve operating during the normal shutdown of a fuel cell apparatus of the type used in vehicle propulsion systems. During a normal shutdown routine, the pressure differential between the anode inlet and anode outlet is monitored in real time in a period corresponding to the normal closing speed of the anode bypass valve and the pressure differential at the end of the closing cycle of the anode bypass valve is compared to the pressure differential at the beginning of the closing cycle. If the difference in pressure differential at the beginning and end of the anode bypass closing cycle indicates that the anode bypass valve has not properly closed, a system controller switches from a normal shutdown mode to a rapid shutdown mode in which the anode inlet is instantaneously vented by rapid vents.
40 CFR 63.8694 - What records must I keep?
Code of Federal Regulations, 2010 CFR
2010-07-01
...)(iii) through (v) related to startup, shutdown, and malfunction. (3) Records of performance tests, performance evaluations, and opacity and visible emission observations as required in § 63.10(b)(2)(viii). (b... Section 63.8694 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS...
78 FR 38739 - Standard Format and Content for Post-Shutdown Decommissioning Activities Report
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-27
...The U.S. Nuclear Regulatory Commission (NRC) is issuing Revision 1 of Regulatory Guide (RG) 1.185, ``Standard Format and Content for Post-shutdown Decommissioning Activities Report.'' This guide describes a method that the NRC staff considers acceptable for use in complying with the Commission's requirements regarding the submission of a post-shutdown decommissioning activities report (PSDAR).
77 FR 75198 - Standard Format and Content for Post-Shutdown Decommissioning Activities Report
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-19
...The U.S. Nuclear Regulatory Commission (NRC) is issuing for public comment draft regulatory guide (DG), DG-1272, ``Standard Format and Content for Post-shutdown Decommissioning Activities Report.'' This guide describes a method that the NRC staff considers acceptable for use in complying with the Commission's requirements regarding the submission of a post-shutdown decommissioning activities report (PSDAR).
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 1 2011-10-01 2011-10-01 false Remote manual shutdown for internal combustion engine... for Cargo Handling § 32.50-35 Remote manual shutdown for internal combustion engine driven cargo pump on tank vessels—TB/ALL. (a) Any tank vessel which is equipped with an internal combustion engine...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 1 2013-10-01 2013-10-01 false Remote manual shutdown for internal combustion engine... for Cargo Handling § 32.50-35 Remote manual shutdown for internal combustion engine driven cargo pump on tank vessels—TB/ALL. (a) Any tank vessel which is equipped with an internal combustion engine...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 1 2010-10-01 2010-10-01 false Remote manual shutdown for internal combustion engine... for Cargo Handling § 32.50-35 Remote manual shutdown for internal combustion engine driven cargo pump on tank vessels—TB/ALL. (a) Any tank vessel which is equipped with an internal combustion engine...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 1 2012-10-01 2012-10-01 false Remote manual shutdown for internal combustion engine... for Cargo Handling § 32.50-35 Remote manual shutdown for internal combustion engine driven cargo pump on tank vessels—TB/ALL. (a) Any tank vessel which is equipped with an internal combustion engine...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 1 2014-10-01 2014-10-01 false Remote manual shutdown for internal combustion engine... for Cargo Handling § 32.50-35 Remote manual shutdown for internal combustion engine driven cargo pump on tank vessels—TB/ALL. (a) Any tank vessel which is equipped with an internal combustion engine...
40 CFR 63.8691 - How do I demonstrate continuous compliance with the operating limits?
Code of Federal Regulations, 2014 CFR
2014-07-01
... operating limit in Table 5 to this subpart that applies to you. This includes periods of startup, shutdown... §§ 63.6(e) and 63.7(e)(1), deviations that occur during a period of startup, shutdown, or malfunction... of startup, shutdown, or malfunction are violations, according to the provisions in § 63.6(e). [68 FR...
40 CFR 63.9925 - What other requirements must I meet to demonstrate continuous compliance?
Code of Federal Regulations, 2010 CFR
2010-07-01
... includes periods of startup, shutdown, and malfunction. You must also report each instance in which you did... § 63.9931. (b) Startups, shutdowns, and malfunctions. (1) Consistent with §§ 63.6(e) and 63.7(e)(1), deviations that occur during a period of startup, shutdown, or malfunction are not violations if you...
40 CFR 63.8691 - How do I demonstrate continuous compliance with the operating limits?
Code of Federal Regulations, 2010 CFR
2010-07-01
... operating limit in Table 5 to this subpart that applies to you. This includes periods of startup, shutdown... §§ 63.6(e) and 63.7(e)(1), deviations that occur during a period of startup, shutdown, or malfunction... of startup, shutdown, or malfunction are violations, according to the provisions in § 63.6(e). [68 FR...
40 CFR 63.8691 - How do I demonstrate continuous compliance with the operating limits?
Code of Federal Regulations, 2011 CFR
2011-07-01
... operating limit in Table 5 to this subpart that applies to you. This includes periods of startup, shutdown... §§ 63.6(e) and 63.7(e)(1), deviations that occur during a period of startup, shutdown, or malfunction... of startup, shutdown, or malfunction are violations, according to the provisions in § 63.6(e). [68 FR...
40 CFR 63.9925 - What other requirements must I meet to demonstrate continuous compliance?
Code of Federal Regulations, 2013 CFR
2013-07-01
... includes periods of startup, shutdown, and malfunction. You must also report each instance in which you did... § 63.9931. (b) Startups, shutdowns, and malfunctions. (1) Consistent with §§ 63.6(e) and 63.7(e)(1), deviations that occur during a period of startup, shutdown, or malfunction are not violations if you...
40 CFR 63.9925 - What other requirements must I meet to demonstrate continuous compliance?
Code of Federal Regulations, 2012 CFR
2012-07-01
... includes periods of startup, shutdown, and malfunction. You must also report each instance in which you did... § 63.9931. (b) Startups, shutdowns, and malfunctions. (1) Consistent with §§ 63.6(e) and 63.7(e)(1), deviations that occur during a period of startup, shutdown, or malfunction are not violations if you...
40 CFR 63.9925 - What other requirements must I meet to demonstrate continuous compliance?
Code of Federal Regulations, 2011 CFR
2011-07-01
... includes periods of startup, shutdown, and malfunction. You must also report each instance in which you did... § 63.9931. (b) Startups, shutdowns, and malfunctions. (1) Consistent with §§ 63.6(e) and 63.7(e)(1), deviations that occur during a period of startup, shutdown, or malfunction are not violations if you...
40 CFR 63.8691 - How do I demonstrate continuous compliance with the operating limits?
Code of Federal Regulations, 2012 CFR
2012-07-01
... operating limit in Table 5 to this subpart that applies to you. This includes periods of startup, shutdown... §§ 63.6(e) and 63.7(e)(1), deviations that occur during a period of startup, shutdown, or malfunction... of startup, shutdown, or malfunction are violations, according to the provisions in § 63.6(e). [68 FR...
40 CFR 63.9925 - What other requirements must I meet to demonstrate continuous compliance?
Code of Federal Regulations, 2014 CFR
2014-07-01
... includes periods of startup, shutdown, and malfunction. You must also report each instance in which you did... § 63.9931. (b) Startups, shutdowns, and malfunctions. (1) Consistent with §§ 63.6(e) and 63.7(e)(1), deviations that occur during a period of startup, shutdown, or malfunction are not violations if you...
40 CFR 63.8691 - How do I demonstrate continuous compliance with the operating limits?
Code of Federal Regulations, 2013 CFR
2013-07-01
... operating limit in Table 5 to this subpart that applies to you. This includes periods of startup, shutdown... §§ 63.6(e) and 63.7(e)(1), deviations that occur during a period of startup, shutdown, or malfunction... of startup, shutdown, or malfunction are violations, according to the provisions in § 63.6(e). [68 FR...
NASA Astrophysics Data System (ADS)
Jaboulay, Jean-Charles; Brun, Emeric; Hugot, François-Xavier; Huynh, Tan-Dat; Malouch, Fadhel; Mancusi, Davide; Tsilanizara, Aime
2017-09-01
After fission or fusion reactor shutdown the activated structure emits decay photons. For maintenance operations the radiation dose map must be established in the reactor building. Several calculation schemes have been developed to calculate the shutdown dose rate. These schemes are widely developed in fusion application and more precisely for the ITER tokamak. This paper presents the rigorous-two-steps scheme implemented at CEA. It is based on the TRIPOLI-4® Monte Carlo code and the inventory code MENDEL. The ITER shutdown dose rate benchmark has been carried out, results are in a good agreement with the other participant.
Impacts of flare emissions from an ethylene plant shutdown to regional air quality
NASA Astrophysics Data System (ADS)
Wang, Ziyuan; Wang, Sujing; Xu, Qiang; Ho, Thomas
2016-08-01
Critical operations of chemical process industry (CPI) plants such as ethylene plant shutdowns could emit a huge amount of VOCs and NOx, which may result in localized and transient ozone pollution events. In this paper, a general methodology for studying dynamic ozone impacts associated with flare emissions from ethylene plant shutdowns has been developed. This multi-scale simulation study integrates process knowledge of plant shutdown emissions in terms of flow rate and speciation together with regional air-quality modeling to quantitatively investigate the sensitivity of ground-level ozone change due to an ethylene plant shutdown. The study shows the maximum hourly ozone increments can vary significantly by different plant locations and temporal factors including background ozone data and solar radiation intensity. It helps provide a cost-effective air-quality control strategy for industries by choosing the optimal starting time of plant shutdown operations in terms of minimizing the induced ozone impact (reduced from 34.1 ppb to 1.2 ppb in the performed case studies). This study provides valuable technical supports for both CPI and environmental policy makers on cost-effective air-quality controls in the future.
NA61/SHINE facility at the CERN SPS: beams and detector system
NASA Astrophysics Data System (ADS)
Abgrall, N.; Andreeva, O.; Aduszkiewicz, A.; Ali, Y.; Anticic, T.; Antoniou, N.; Baatar, B.; Bay, F.; Blondel, A.; Blumer, J.; Bogomilov, M.; Bogusz, M.; Bravar, A.; Brzychczyk, J.; Bunyatov, S. A.; Christakoglou, P.; Cirkovic, M.; Czopowicz, T.; Davis, N.; Debieux, S.; Dembinski, H.; Diakonos, F.; Di Luise, S.; Dominik, W.; Drozhzhova, T.; Dumarchez, J.; Dynowski, K.; Engel, R.; Efthymiopoulos, I.; Ereditato, A.; Fabich, A.; Feofilov, G. A.; Fodor, Z.; Fulop, A.; Gaździcki, M.; Golubeva, M.; Grebieszkow, K.; Grzeszczuk, A.; Guber, F.; Haesler, A.; Hasegawa, T.; Hierholzer, M.; Idczak, R.; Igolkin, S.; Ivashkin, A.; Jokovic, D.; Kadija, K.; Kapoyannis, A.; Kaptur, E.; Kielczewska, D.; Kirejczyk, M.; Kisiel, J.; Kiss, T.; Kleinfelder, S.; Kobayashi, T.; Kolesnikov, V. I.; Kolev, D.; Kondratiev, V. P.; Korzenev, A.; Koversarski, P.; Kowalski, S.; Krasnoperov, A.; Kurepin, A.; Larsen, D.; Laszlo, A.; Lyubushkin, V. V.; Maćkowiak-Pawłowska, M.; Majka, Z.; Maksiak, B.; Malakhov, A. I.; Maletic, D.; Manglunki, D.; Manic, D.; Marchionni, A.; Marcinek, A.; Marin, V.; Marton, K.; Mathes, H.-J.; Matulewicz, T.; Matveev, V.; Melkumov, G. L.; Messina, M.; Mrówczyński, St.; Murphy, S.; Nakadaira, T.; Nirkko, M.; Nishikawa, K.; Palczewski, T.; Palla, G.; Panagiotou, A. D.; Paul, T.; Peryt, W.; Petukhov, O.; Pistillo, C.; Płaneta, R.; Pluta, J.; Popov, B. A.; Posiadala, M.; Puławski, S.; Puzovic, J.; Rauch, W.; Ravonel, M.; Redij, A.; Renfordt, R.; Richter-Was, E.; Robert, A.; Röhrich, D.; Rondio, E.; Rossi, B.; Roth, M.; Rubbia, A.; Rustamov, A.; Rybczyński, M.; Sadovsky, A.; Sakashita, K.; Savic, M.; Schmidt, K.; Sekiguchi, T.; Seyboth, P.; Sgalaberna, D.; Shibata, M.; Sipos, R.; Skrzypczak, E.; Słodkowski, M.; Sosin, Z.; Staszel, P.; Stefanek, G.; Stepaniak, J.; Stroebele, H.; Susa, T.; Szuba, M.; Tada, M.; Tereshchenko, V.; Tolyhi, T.; Tsenov, R.; Turko, L.; Ulrich, R.; Unger, M.; Vassiliou, M.; Veberic, D.; Vechernin, V. V.; Vesztergombi, G.; Vinogradov, L.; Wilczek, A.; Włodarczyk, Z.; Wojtaszek-Szwarz, A.; Wyszyński, O.; Zambelli, L.; Zipper, W.
2014-06-01
NA61/SHINE (SPS Heavy Ion and Neutrino Experiment) is a multi-purpose experimental facility to study hadron production in hadron-proton, hadron-nucleus and nucleus-nucleus collisions at the CERN Super Proton Synchrotron. It recorded the first physics data with hadron beams in 2009 and with ion beams (secondary 7Be beams) in 2011. NA61/SHINE has greatly profited from the long development of the CERN proton and ion sources and the accelerator chain as well as the H2 beamline of the CERN North Area. The latter has recently been modified to also serve as a fragment separator as needed to produce the Be beams for NA61/SHINE. Numerous components of the NA61/SHINE set-up were inherited from its predecessors, in particular, the last one, the NA49 experiment. Important new detectors and upgrades of the legacy equipment were introduced by the NA61/SHINE Collaboration. This paper describes the state of the NA61/SHINE facility — the beams and the detector system — before the CERN Long Shutdown I, which started in March 2013.
An overview of ALARA considerations during Yankee Atomic`s Component Removal Project
DOE Office of Scientific and Technical Information (OSTI.GOV)
Granados, B.; Babineau, G.; Colby, B.
1995-03-01
In Februrary 1992, Yankee Atomic Electric Company (YAEC) permanently shutdown Yankee Nuclear Power Station in Rowe, Massachusetts, after thirty-two years of efficient operation. Yankee`s plan decommissioning is to defer dismantlement until a low level radioactive waste (LLRW) disposal facility is available. The plant will be maintained in a safe storage condition until a firm contract for the disposal of LLRW generated during decommissioning can be secured. Limited access to a LLRW disposal facility may occur during the safe storage period. Yankee intends to use these opportunities to remove components and structures. A Component Removal Project (CRP) was initiated in 1993more » to take advantage of one of these opportunities. A Componenet Removal Project (CRP) was initiated in 1993 to take advantage of one of these opportunities. The CRP includes removal of four steam generators, the pressurizer, and segmentation of reactor vessel internals and preparation of LLRW for shipment and disposal at Chem-Nuclear`s Barnwell, South Carolina facility. The CRP is projected to be completed by June 1994 at an estimated total worker exposure of less than 160 person-rem.« less
Task 12 data dump (phase 2) OME integrated thrust chamber test report
NASA Technical Reports Server (NTRS)
Tobin, R. D.; Pauckert, R. P.
1974-01-01
The characteristics and performance of the orbit maneuvering engine for the space shuttle are discussed. Emphasis is placed on the regeneratively cooled thrust chamber of the engine. Tests were conducted to determine engine operating parameters during the start, shutdown, and restart. Characteristics of the integrated thrust chamber and the performance and thermal conditions for blowdown operation without supplementary boundary layer cooling were investigated. The results of the test program are presented.
Consortium Requirements Engineering Guidebook
1993-12-01
re- quirements among developers or contractors, acquisition managers, and users. A CoRE specification serves as both the test -to and design-to...that are used for the following purposes: (1) the button labeled SELF TEST allows the operator to check the FLMS’s output hardware while the system is...shut down; and (2) the button labeled RESET allows the system to be brought back into normal operation following a shutdown or testing as long as the
Cycling operation of fossil plants
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bhatnagar, U.S.; Weiss, M.D.; White, W.H.
1991-05-01
This report presents a methodology for examining the economic feasibility of converting fossil power plants from baseload to cycling service. It employs this approach to examine a proposed change of Pepco's Potomac River units 3, 4, and 5 from baseload operation of two-shift cycling. The project team first reviewed all components and listed potential cycling effects involved in the conversion of Potomac River units 3, 4, and 5. They developed general cycling plant screening criteria including the number of hot, warm, or cold restart per year and desired load ramp rates. In addition, they evaluated specific limitations on the boiler,more » turbine, and the balance of plant. They estimated the remaining life of the facility through component evaluation and boiler testing and also identified and prioritized potential component deficiencies by their impact on key operational factors: safety, heat rate, turn down, startup/shutdown time, and plant availability. They developed solutions to these problems; and, since many solutions mitigate more than one problem, they combined and reprioritized these synergistic solutions. Economic assessments were performed on all solutions. 13 figs., 20 tabs.« less
Transportation monitoring unit qualification
NASA Technical Reports Server (NTRS)
Cook, M.
1990-01-01
Transportation monitoring unit (TMU) qualification testing was performed between 3 Mar. and 14 Dec. 1989. The purpose of the testing was to qualify the TMUs to monitor and store temperature and acceleration data on redesigned solid rocket motor segments and exit cones while they are being shipped from Utah's Thiokol Corporation, Space Operations, to Kennedy Space Center. TMUs were subjected to transportation tests that concerned the structural integrity of the TMUs only, and did not involve TMU measuring capability. This testing was terminated prior to completion due to mounting plate failures, high and low temperature shutdown failures, and data collection errors. Corrective actions taken by the vendor to eliminate high temperature shutdowns were ineffective. An evaluation was performed on the TMUs to determine the TMU vibration and temperature measuring accuracy at a variety of temperatures. This test demonstrated that TMU measured shock levels are high, and that TMUs are temperature sensitive because of decreased accuracy at high and low temperatures. It was determined that modifications to the current TMU system, such that it could be qualified for use, would require a complete redesign and remanufacture. Because the cost of redesigning and remanufacturing the present TMU system exceeds the cost of procuring a new system that could be qualified without modification, it is recommended that an alternate transportation monitoring system be qualified.
Santella, Nicholas; Steinberg, Laura J; Sengul, Hatice
2010-04-01
Hurricane Katrina struck an area dense with industry, causing numerous releases of petroleum and hazardous materials. This study integrates information from a number of sources to describe the frequency, causes, and effects of these releases in order to inform analysis of risk from future hurricanes. Over 200 onshore releases of hazardous chemicals, petroleum, or natural gas were reported. Storm surge was responsible for the majority of petroleum releases and failure of storage tanks was the most common mechanism of release. Of the smaller number of hazardous chemical releases reported, many were associated with flaring from plant startup, shutdown, or process upset. In areas impacted by storm surge, 10% of the facilities within the Risk Management Plan (RMP) and Toxic Release Inventory (TRI) databases and 28% of SIC 1311 facilities experienced accidental releases. In areas subject only to hurricane strength winds, a lower fraction (1% of RMP and TRI and 10% of SIC 1311 facilities) experienced a release while 1% of all facility types reported a release in areas that experienced tropical storm strength winds. Of industrial facilities surveyed, more experienced indirect disruptions such as displacement of workers, loss of electricity and communication systems, and difficulty acquiring supplies and contractors for operations or reconstruction (55%), than experienced releases. To reduce the risk of hazardous material releases and speed the return to normal operations under these difficult conditions, greater attention should be devoted to risk-based facility design and improved prevention and response planning.
30 CFR 7.103 - Safety system control test.
Code of Federal Regulations, 2011 CFR
2011-07-01
... the temperature sensor in the exhaust gas stream which will automatically activate the safety shutdown... control that might interfere with the evaluation of the operation of the exhaust gas temperature sensor... allowable low water level. Run the engine until the exhaust gas temperature sensor activates the safety...
30 CFR 7.103 - Safety system control test.
Code of Federal Regulations, 2010 CFR
2010-07-01
... the temperature sensor in the exhaust gas stream which will automatically activate the safety shutdown... control that might interfere with the evaluation of the operation of the exhaust gas temperature sensor... allowable low water level. Run the engine until the exhaust gas temperature sensor activates the safety...
NASA Astrophysics Data System (ADS)
1982-07-01
Plant and system level operating instructions are provided for the Barstow Solar Pilot Plant. Individual status instructions are given that identify plant conditions, process controller responsibilities, process conditions and control accuracies, operating envelopes, and operator cautions appropriate to the operating condition. Transition operating instructions identify the sequence of activities to be carried out to accomplish the indicated transition. Most transitions involve the startup or shutdown of an individual flowpath. Background information is provided on collector field operations, and the heliostat groupings and specific commands used in support receiver startup are defined.
Technical information report: Plasma melter operation, reliability, and maintenance analysis
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hendrickson, D.W.
1995-03-14
This document provides a technical report of operability, reliability, and maintenance of a plasma melter for low-level waste vitrification, in support of the Hanford Tank Waste Remediation System (TWRS) Low-Level Waste (LLW) Vitrification Program. A process description is provided that minimizes maintenance and downtime and includes material and energy balances, equipment sizes and arrangement, startup/operation/maintence/shutdown cycle descriptions, and basis for scale-up to a 200 metric ton/day production facility. Operational requirements are provided including utilities, feeds, labor, and maintenance. Equipment reliability estimates and maintenance requirements are provided which includes a list of failure modes, responses, and consequences.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Curley, C.C.; Overas, A.J.
1976-01-01
The design and performance of the variable-pitch axial-flow forced-draft and induced-draft fans used in two 820MW generating units at the Martins Creek Power Plant are described. Information is included on fan design; silencers; mechanical and metallurgical testing; insulation; performance testing; start-up and shutdown procedures; and maintenance. (LCL)
Processing and Preparation of Advanced Stirling Convertors for Extended Operation
NASA Technical Reports Server (NTRS)
Oriti, Salvatore M.; Cornell, Paggy A.
2008-01-01
The U.S. Department of Energy (DOE), Lockheed Martin Space Company (LMSC), Sunpower Inc., and NASA Glenn Research Center (GRC) have been developing an Advanced Stirling Radioisotope Generator (ASRG) for use as a power system on space science missions. This generator will make use of the free-piston Stirling convertors to achieve higher conversion efficiency than currently available alternatives. NASA GRC is supporting the development of the ASRG by providing extended operation of several Sunpower Inc. Advanced Stirling Convertors (ASCs). In the past year and a half, eight ASCs have operated in continuous, unattended mode in both air and thermal vacuum environments. Hardware, software, and procedures were developed to prepare each convertor for extended operation with intended durations on the order of tens of thousands of hours. Steps taken to prepare a convertor for long-term operation included geometry measurements, thermocouple instrumentation, evaluation of working fluid purity, evacuation with bakeout, and high purity charge. Actions were also taken to ensure the reliability of support systems, such as data acquisition and automated shutdown checkouts. Once a convertor completed these steps, it underwent short-term testing to gather baseline performance data before initiating extended operation. These tests included insulation thermal loss characterization, low-temperature checkout, and full-temperature and power demonstration. This paper discusses the facilities developed to support continuous, unattended operation, and the processing results of the eight ASCs currently on test.
NASA Technical Reports Server (NTRS)
Oriti, Salvatore M.; Cornell, Peggy A.
2008-01-01
The U.S. Department of Energy (DOE), Lockheed Martin Space Company (LMSC), Sunpower Inc., and NASA Glenn Research Center (GRC) have been developing an Advanced Stirling Radioisotope Generator (ASRG) for use as a power system on space science missions. This generator will make use of the free-piston Stirling convertors to achieve higher conversion efficiency than currently available alternatives. NASA GRC is supporting the development of the ASRG by providing extended operation of several Sunpower Inc. Advanced Stirling Convertors (ASCs). In the past year and a half, eight ASCs have operated in continuous, unattended mode in both air and thermal vacuum environments. Hardware, software, and procedures were developed to prepare each convertor for extended operation with intended durations on the order of tens of thousands of hours. Steps taken to prepare a convertor for long-term operation included geometry measurements, thermocouple instrumentation, evaluation of working fluid purity, evacuation with bakeout, and high purity charge. Actions were also taken to ensure the reliability of support systems, such as data acquisition and automated shutdown checkouts. Once a convertor completed these steps, it underwent short-term testing to gather baseline performance data before initiating extended operation. These tests included insulation thermal loss characterization, low-temperature checkout, and full-temperature and power demonstration. This paper discusses the facilities developed to support continuous, unattended operation, and the processing results of the eight ASCs currently on test.
CONTROL RODS FOR NUCLEAR REACTORS
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bell, F.R.
1963-01-16
A means for controlling the control rod in emergency, when it is desired to shutdown the reactor with the shortest possible delay, is described. When the emergency occurs the control rod is allowed to drop freely under gravity from the control rod support tube into the bore in the reactor core. A normal shutdown is reached almost at the lowest rod position. In the shut-down position and also below it, the control rod had its full effect of reducing the level of activity in the core. When the shut-down position was reached, a brake came into action to decelerate themore » rod and reduce shock and the likelihood of damage. (C.E.S.)« less
A rapid biochemical test to assess postharvest deterioration of sugarcane and milled juice
USDA-ARS?s Scientific Manuscript database
The delivery of consignments of deteriorated sugarcane to factories can detrimentally affect multiple process units, and even lead to a factory shut-down. An enzymatic factory method was used to measure mannitol, a major degradation product of sugarcane Leuconostoc deterioration in the U.S., in pre...
Code of Federal Regulations, 2011 CFR
2011-07-01
... Hazardous Air Pollutant Emissions: Group IV Polymers and Resins § 63.1312 Definitions. (a) The following....111) Owner or operator (§ 63.2) Performance evaluation (§ 63.2) Performance test (§ 63.2) Permitting...-up, shutdown, and malfunction plan (§ 63.101) State (§ 63.2) Stationary Source (§ 63.2) Surge control...
Code of Federal Regulations, 2014 CFR
2014-10-01
... transmitters shall incorporate a programmable means to implement a system shutdown process in the event of... test technique. A formula for a suitable tissue substitute material is defined in OET Bulletin 65...
Code of Federal Regulations, 2013 CFR
2013-10-01
... transmitters shall incorporate a programmable means to implement a system shutdown process in the event of... test technique. A formula for a suitable tissue substitute material is defined in OET Bulletin 65...
33 CFR 154.310 - Operations manual: Contents.
Code of Federal Regulations, 2010 CFR
2010-07-01
... the piping subject to the tests required by § 156.170(c)(4) of this chapter, and the locations of...; and (2) A description of the vapor control system's design and operation including the: (i) Vapor line... sulfur); (v) Alarms and shutdown devices; and (vi) Pre-transfer equipment inspection requirements. (c...
Experiments in DIII-D Toward Achieving Rapid Shutdown with Runaway Electron Suppression
NASA Astrophysics Data System (ADS)
Hollmann, E. M.
2009-11-01
For safe discharge shutdown in future large tokamaks in the event of an unavoidable disruption, it is important to develop rapid (˜ several ms)shutdown methods to avoid large runaway electron currents, which pose a serious threat to plasma facing components. Prevention of runaway current formation has been proposed by either increasing electron-electron collisionality with massive particle injection, or magnetically by using externally applied non-axisymmetric fields to increase radial diffusive losses of a runaway seed population. Experiments studying both approaches have been pursued in the DIII-D tokamak. For collisional suppression, three different rapid shutdown methods are being investigated: massive gas injection, massive shattered cryogenic pellet injection, and polystyrene shell pellet injection. First-of-kind demonstrations of fast shutdowns were produced by 3000 Torr-l (0.8-g) shattered D2 pellets and large, 10-mm diameter, 0.3-g polystyrene shell pellets filled with boron powder. The application of external magnetic perturbations shows promising preliminary results in suppressing seed runaway electrons, although lack of repeatability in the runaway seed term made these results challenging to interpret. Experiments have been performed to help understand how runaways form and are transported during rapid shutdown. These experiments confirm that the commonly used 0D loop voltage + Dreicer evaporation picture of runaway seed formation is not applicable here, with relativistic E > 0.5,MeV electrons forming before any external loop voltage appears. Present applications of 0D, 1D, and 2D models to the rapid shutdown and runaway confinement experiments, as well as preliminary extrapolations to ITER, will be discussed.
Designing an Alternate Mission Operations Control Room
NASA Technical Reports Server (NTRS)
Montgomery, Patty; Reeves, A. Scott
2014-01-01
The Huntsville Operations Support Center (HOSC) is a multi-project facility that is responsible for 24x7 real-time International Space Station (ISS) payload operations management, integration, and control and has the capability to support small satellite projects and will provide real-time support for SLS launches. The HOSC is a serviceoriented/ highly available operations center for ISS payloads-directly supporting science teams across the world responsible for the payloads. The HOSC is required to endure an annual 2-day power outage event for facility preventive maintenance and safety inspection of the core electro-mechanical systems. While complete system shut-downs are against the grain of a highly available sub-system, the entire facility must be powered down for a weekend for environmental and safety purposes. The consequence of this ground system outage is far reaching: any science performed on ISS during this outage weekend is lost. Engineering efforts were focused to maximize the ISS investment by engineering a suitable solution capable of continuing HOSC services while supporting safety requirements. The HOSC Power Outage Contingency (HPOC) System is a physically diversified compliment of systems capable of providing identified real-time services for the duration of a planned power outage condition from an alternate control room. HPOC was designed to maintain ISS payload operations for approximately three continuous days during planned HOSC power outages and support a local Payload Operations Team, International Partners, as well as remote users from the alternate control room located in another building. This paper presents the HPOC architecture and lessons learned during testing and the planned maiden operational commissioning. Additionally, this paper documents the necessity of an HPOC capability given the unplanned HOSC Facility power outage on April 27th, 2011, as a result of the tornado outbreak that damaged the electrical grid to such a degree that significantly inhibited the Tennessee Valley Authority's ability to transmit electricity throughout the North Alabama region.
NASA Technical Reports Server (NTRS)
Nuttall, L. J.; Titterington, W. A.
1974-01-01
Details of the design and system verification test results are presented for a six-man-rated oxygen generation system. The system configuration incorporates components and instrumentation for computer-controlled operation with automatic start-up/shutdown sequencing, fault detection and isolation, and with self-contained sensors and controls for automatic safe emergency shutdown. All fluid and electrical components, sensors, and electronic controls are designed to be easily maintainable under zero-gravity conditions. On-board component spares are utilized in the system concept to sustain long-term operation (six months minimum) in a manned spacecraft application. The system is centered on a 27-cell solid polymer electrolyte water electrolysis module which, combined with the associated system components and controls, forms a total system envelope 40 in. high, 40 in. wide, and 30 in. deep.
FROM CONCEPT TO REALITY, IN-SITU DECOMMISSIONING OF THE P AND R REACTORS AT THE SAVANNAH RIVER SITE
DOE Office of Scientific and Technical Information (OSTI.GOV)
Musall, J.; Blankenship, J.; Griffin, W.
2012-01-09
SRS recently completed an approximately three year effort to decommission two SRS reactors: P-Reactor (Building 105-P) and R-Reactor (Building 105-R). Completed in December 2011, the concurrent decommissionings marked the completion of two relatively complex and difficult facility disposition projects at the SRS. Buildings 105-P and 105-R began operating as production reactors in the early 1950s with the mission of producing weapons material (e.g., tritium and plutonium-239). The 'P' Reactor and was shutdown in 1991 while the 'R' Reactor and was shutdown in 1964. In the intervening period between shutdown and deactivation & decommissioning (D&D), Buildings 105-P and 105-R saw limitedmore » use (e.g., storage of excess heavy water and depleted uranium oxide). For Building 105-P, deactivation was initiated in April 2007 and was essentially complete by June 2010. For Building 105-R, deactivation was initiated in August 2008 and was essentially complete by September 2010. For both buildings, the primary objective of deactivation was to remove/mitigate hazards associated with the remaining hazardous materials, and thus prepare the buildings for in-situ decommissioning. Deactivation removed the following hazardous materials to the extent practical: combustibles/flammables, residual heavy water, acids, friable asbestos (as needed to protect workers performing deactivation and decommissioning), miscellaneous chemicals, lead/brass components, Freon(reg sign), oils, mercury/PCB containing components, mold and some radiologically-contaminated equipment. In addition to the removal of hazardous materials, deactivation included the removal of hazardous energy, exterior metallic components (representing an immediate fall hazard), and historical artifacts along with the evaporation of water from the two Disassembly Basins. Finally, so as to facilitate occupancy during the subsequent in-situ decommissioning, deactivation implemented repairs to the buildings and provided temporary power.« less
Static Stress Transfers Causes Delayed Seismicity Shutdown
NASA Astrophysics Data System (ADS)
Kroll, K.; Richards-Dinger, K. B.; Dieterich, J. H.; Cochran, E. S.
2015-12-01
It has been long debated what role static stress changes play in the enhancement and suppression of seismicity in the near-field region of large earthquakes. While numerous observations have correlated earthquake triggering and elevated seismicity rates with regions of increased Coulomb failure stress (CFS), observations of seismic quiescence in stress shadow regions are more controversial. When observed, seismicity shutdowns are often delayed by days to months following a negative stress perturbation. Some studies propose that the delay in the seismic shutdown can be caused by rupture promoting failure on one fault type while suppressing activity on another; thus the observed seismicity reflects the weighted contribution of the two faulting populations. For example, it was noted that in the 75 years following the 1906 San Francisco earthquake, strike-slip faulting earthquakes were inhibited, while thrust faulting events were promoted. However, definitive observations supporting this delayed shutdown mechanism are rare. In this study, we report seismicity rate increases and decreases that correlate with regions of Coulomb stress transfer, and show observations of a delayed shutdown in the Yuha Desert, California. We use a Coulomb stress change model coupled with a rate-and state- earthquake model to show that the delay in the shutdown is due to the combined changes in the rates of normal and strike-slip faulting events following the 2010 M5.72 Ocotillo aftershock of the 2010 El Mayor-Cucapah earthquake.
Optical Detection Of Cryogenic Leaks
NASA Technical Reports Server (NTRS)
Wyett, Lynn M.
1988-01-01
Conceptual system identifies leakage without requiring shutdown for testing. Proposed device detects and indicates leaks of cryogenic liquids automatically. Detector makes it unnecessary to shut equipment down so it can be checked for leakage by soap-bubble or helium-detection methods. Not necessary to mix special gases or other materials with cryogenic liquid flowing through equipment.
The Static Pac was verified at a natural gas compressor station operated by ANR Pipeline Company. The test was carried out on two engines (8-cylinder, 2000 hp), each with two reciprocating compressors operating in parallel (4 in. rods). The evaluation focused on two shutdown proc...
78 FR 20144 - Entergy Nuclear Operations, Inc., Indian Point Nuclear Generating Unit 3
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-03
... Research. The test results concluded that the Hemyc ERFBS does not provide the level of protection expected... information that that you do not want to be publicly disclosed in your comment submission. The NRC will post... to the credited post-fire safe-shutdown capability which remains materially unchanged from the...
40 CFR 63.6011 - What records must I keep?
Code of Federal Regulations, 2010 CFR
2010-07-01
... Standards for Hazardous Air Pollutants: Rubber Tire Manufacturing Notifications, Reports, and Records § 63... performance tests as required in § 63.10(b)(2)(viii). (3) The records in § 63.6(e)(3)(iii) through (v) related to startup, shutdown, and malfunction. (b) For each tire production affected source, you must keep...
Changing Locus of Control: Steelworkers Adjusting to Forced Unemployment
ERIC Educational Resources Information Center
Legerski, Elizabeth Miklya; Cornwall, Marie; O'Neil, Brock
2006-01-01
Using an abbreviated version of Levenson's (1981) locus of control scale, we examine change over time in the locus of control of displaced steelworkers. The first data collection occurred approximately six months after plant shutdown, the second occurred a year later. Utilizing a multidimensional measurement model, we test the major assumption…
Hubble space telescope six-battery test bed
NASA Technical Reports Server (NTRS)
Pajak, J. A.; Bush, J. R., Jr.; Lanier, J. R., Jr.
1990-01-01
A test bed for a large space power system breadboard for the Hubble Space Telescope (HST) was designed and built to test the system under simulated orbital conditions. A discussion of the data acquisition and control subsystems designed to provide for continuous 24 hr per day operation and a general overview of the test bed is presented. The data acquisition and control subsystems provided the necessary monitoring and protection to assure safe shutdown with protection of test articles in case of loss of power or equipment failure over the life of the test (up to 5 years).
Virtual sensors for robust on-line monitoring (OLM) and Diagnostics
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tipireddy, Ramakrishna; Lerchen, Megan E.; Ramuhalli, Pradeep
Unscheduled shutdown of nuclear power facilities for recalibration and replacement of faulty sensors can be expensive and disruptive to grid management. In this work, we present virtual (software) sensors that can replace a faulty physical sensor for a short duration thus allowing recalibration to be safely deferred to a later time. The virtual sensor model uses a Gaussian process model to process input data from redundant and other nearby sensors. Predicted data includes uncertainty bounds including spatial association uncertainty and measurement noise and error. Using data from an instrumented cooling water flow loop testbed, the virtual sensor model has predictedmore » correct sensor measurements and the associated error corresponding to a faulty sensor.« less
Startup, Shutdown, & Malfunction (SSM) Emissions
EPA issued a final action to ensure states have plans in place that are fully consistent with the Clean Air Act and recent court decisions concerning startup, shutdown and malfunction (SSM) operations.
NUMBER AND TYPE OF OPERATING CYCLES FOR THE FFTF
DOE Office of Scientific and Technical Information (OSTI.GOV)
Boyd, D. C.
1969-05-15
The choice of materials and other vessel design decisions necessary to provide the desired life expectancy for the FTR vessel are partially dependent upon estimates of the number and type of reactor shutdowns and startups which may be anticipated. Current estimates of these so-called "cycles" are given, including scram frequency, experimental outage frequency, standard shutdowns and startups, and rapid controlled shutdowns. Also discussed are abnormal heatup or cooldown, and tentative goals for temperature controls. MTR, ETR, and typical PRTR operating histories are tabulated.
Interactive dependency curves for resilience management.
Petit, Frédéric; Wallace, Kelly; Phillip, Julia
Physical dependencies are a fundamental consideration when assessing the resilience of an organisation and, ultimately, the resilience of a region. Every organisation needs specific resources for supporting its operations. A disruption in the supply of these resources can severely impact business continuity. It is important to characterise dependencies thoroughly when seeking to reduce the extent an organisation is directly affected by the missions, functions and operations of other organisations. The general protocol when addressing each critical resource is to determine the use for the resource, whether there are redundant services providing the resource, and what protections, backup equipment and arrangements are in place to maintain service. Finally, the criticality of the resource is determined by estimating the time it will take for the facility to experience a severe impact once primary service is lost and what percentage of facility operations can be maintained without backup service in place, as well as identifying whether any external regulations/policies are in place that require shutdown of the facility because of service disruption owing to lack of a critical resource. All of this information can be presented in the form of interactive dependency curves that help anticipate and manage the effect(s) of a disruption on critical resources supply.
Task 4 completion report for 40 Kilowatt grid connected modification contract
NASA Technical Reports Server (NTRS)
Vogt, J. H.
1983-01-01
Startup, operation in grid connect mode, shutdown from grid connects, operation in isolated mode, shutdown from isolated mode, steady state operation, mode transfers, and voltage disconnects are addressed.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-11
...; Excess Emissions During Startup, Shutdown, Maintenance, and Malfunction Activities AGENCY: Environmental...; Texas; Excess Emissions During Startup, Shutdown, Maintenance, and Malfunction Activities.'' As...
Ollson, Christopher A; Knopper, Loren D; Whitfield Aslund, Melissa L; Jayasinghe, Ruwan
2014-01-01
The regions of Durham and York in Ontario, Canada have partnered to construct an energy-from-waste thermal treatment facility as part of a long term strategy for the management of their municipal solid waste. This paper presents the results of a comprehensive human health risk assessment for this facility. This assessment was based on extensive sampling of baseline environmental conditions (e.g., collection and analysis of air, soil, water, and biota samples) as well as detailed site specific modeling to predict facility-related emissions of 87 identified contaminants of potential concern. Emissions were estimated for both the approved initial operating design capacity of the facility (140,000 tonnes per year) and for the maximum design capacity (400,000 tonnes per year). For the 140,000 tonnes per year scenario, this assessment indicated that facility-related emissions are unlikely to cause adverse health risks to local residents, farmers, or other receptors (e.g., recreational users). For the 400,000 tonnes per year scenarios, slightly elevated risks were noted with respect to inhalation (hydrogen chloride) and infant consumption of breast milk (dioxins and furans), but only during predicted 'upset conditions' (i.e. facility start-up, shutdown, and loss of air pollution control) that represent unusual and/or transient occurrences. However, current provincial regulations require that additional environmental screening would be mandatory prior to expansion of the facility beyond the initial approved capacity (140,000 tonnes per year). Therefore, the potential risks due to upset conditions for the 400,000 tonnes per year scenario should be more closely investigated if future expansion is pursued. © 2013.
A 9700-hour durability test of a five centimeter diameter ion thruster
NASA Technical Reports Server (NTRS)
Nakanishi, S.; Finke, R. C.
1973-01-01
A modified Hughes SIT-5 thruster was life-tested at the Lewis Research Center. The final 2700 hours of the test are described with a charted history of thruster operating parameters and off-normal events. Performance and operating characteristics were nearly constant throughout the test except for neutralizer heater power requirements and accelerator drain current. A post-shutdown inspection revealed sputter erosion of ion chamber components and component flaking of sputtered metal. Several flakes caused beamlet divergence and anomalous grid erosion, causing the test to be terminated. All sputter erosion sources were identified.
Staged venting of fuel cell system during rapid shutdown
Clingerman, Bruce J.; Doan, Tien M.; Keskula, Donald H.
2002-01-01
A venting methodology and system for rapid shutdown of a fuel cell apparatus of the type used in a vehicle propulsion system. H.sub.2 and air flows to the fuel cell stack are slowly bypassed to the combustor upon receipt of a rapid shutdown command. The bypass occurs over a period of time (for example one to five seconds) using conveniently-sized bypass valves. Upon receipt of the rapid shutdown command, the anode inlet of the fuel cell stack is instantaneously vented to a remote vent to remove all H.sub.2 from the stack. Airflow to the cathode inlet of the fuel cell stack gradually diminishes over the bypass period, and when the airflow bypass is complete the cathode inlet is also instantaneously vented to a remote vent to eliminate pressure differentials across the stack.
Staged venting of fuel cell system during rapid shutdown
Keskula, Donald H.; Doan, Tien M.; Clingerman, Bruce J.
2004-09-14
A venting methodology and system for rapid shutdown of a fuel cell apparatus of the type used in a vehicle propulsion system. H.sub.2 and air flows to the fuel cell stack are slowly bypassed to the combustor upon receipt of a rapid shutdown command. The bypass occurs over a period of time (for example one to five seconds) using conveniently-sized bypass valves. Upon receipt of the rapid shutdown command, the anode inlet of the fuel cell stack is instantaneously vented to a remote vent to remove all H.sub.2 from the stack. Airflow to the cathode inlet of the fuel cell stack gradually diminishes over the bypass period, and when the airflow bypass is complete the cathode inlet is also instantaneously vented to a remote vent to eliminate pressure differentials across the stack.
Analysis of activation and shutdown contact dose rate for EAST neutral beam port
NASA Astrophysics Data System (ADS)
Chen, Yuqing; Wang, Ji; Zhong, Guoqiang; Li, Jun; Wang, Jinfang; Xie, Yahong; Wu, Bin; Hu, Chundong
2017-12-01
For the safe operation and maintenance of neutral beam injector (NBI), specific activity and shutdown contact dose rate of the sample material SS316 are estimated around the experimental advanced superconducting tokamak (EAST) neutral beam port. Firstly, the neutron emission intensity is calculated by TRANSP code while the neutral beam is co-injected to EAST. Secondly, the neutron activation and shutdown contact dose rates for the neutral beam sample materials SS316 are derived by the Monte Carlo code MCNP and the inventory code FISPACT-2007. The simulations indicate that the primary radioactive nuclides of SS316 are 58Co and 54Mn. The peak contact dose rate is 8.52 × 10-6 Sv/h after EAST shutdown one second. That is under the International Thermonuclear Experimental Reactor (ITER) design values 1 × 10-5 Sv/h.
Improved refractory performance through partnership
DOE Office of Scientific and Technical Information (OSTI.GOV)
Linck, F.E.; Peters, D.
1995-12-31
From the early designs and construction of Circulating Fluidized Bed (CFB) boilers, many improvements have been made based upon observations of performance. Included in these improvements have been the refractory linings. The early refractory linings were subjected to extreme fluctuations in temperatures as the units experienced up and down conditions. As the designs were improved refractory failures were mostly due to the operating conditions and other mechanical stresses rather than continual shutdowns and startups. More recent problems observed with refractory linings are localized areas of high erosion, corrosion and cracking which result in hot spots and eventual shutdowns for repair.more » Today the objective of refractory suppliers and installers is to strive towards planned shutdowns rather than emergency shutdowns. This can be accomplished through partnerships between operations, material suppliers and installers. In essence, the concept is a cooperative effort between these groups to solve the variety of refractory problems in order to achieve longer refractory lining performance and less chance for emergency shutdowns. The reliability of the refractory lining is dependent on the successful combination of the material selected, proper design and the installation of the refractory material. Where these three elements combine, the lining has the best chance of performing its intended purpose.« less
Lessons learned from the 12 May 2008 Wenchuan earthquake: Impact on industry
NASA Astrophysics Data System (ADS)
Krausmann, E.; Cruz, A. M.; Affeltranger, B.
2009-04-01
The earthquake that shook Wenchuan County in China's Sichuan Province on 12 May 2008 was a major event with a moment magnitude of MW = 7.9 and a depth of only 19 km. It caused a fault rupture of 270 km length and affected a total area of about 500,000 km2. With the intensity reaching XI in the region near the epicentre and peak ground acceleration values as high as 0.63g the earthquake killed almost 70,000 people, injured over 374,000 and rendered 5,000,000 homeless. Over 18,000 are still listed as missing. Prior to the earthquake the area was considered a region of moderate seismicity with a design intensity of 7. Sichuan Province is home to a significant proportion of Chinese chemical and nuclear industry and consequently has a very strong economy. The direct economic loss due to the earthquake amounts to over 1.1 billion Euros. In addition to economic damage there is also concern about earthquake-triggered damage to and destruction of industrial facilities housing or processing hazardous substances and the potential consequences of their release to man or the environment. In order to understand how well the chemical industry fared in the earthquake-affected areas a reconnaissance field trip was organised from 15-21 November, 2008, which included visits to industry in Deyang, Shifang, Mianzhu, Mianyang, Anxian and Dujiangyan. In total we collected information on earthquake effects at 18 industrial facilities. Lessons learned from this reconnaissance field trip confirm the devastating consequences that natural disasters can have on industrial facilities. In addition to casualties and environmental harm the economic losses due to damage, prolonged shut-down periods and business interruption are often ruinous and may result in lay-off of workers. In the case of the visited facilities the shut-down time was up to 6 months. Two facilities were damaged beyond repair and have resulted in significant ammonia, sulphuric acid and other releases that in addition to polluting a river also necessitated the evacuation of 6,000 residents. The main cause of worker death and injury was the collapse of warehouses, office and manufacturing buildings. This concerned mostly concrete structures with insufficient confinement or poor reinforcement that could not withstand the earthquake loads. The falling debris resulted in equipment damage and loss, as well as pipe severing and crushing in buildings housing machinery. This was brought about either by direct debris impact or by support failure inside buildings. Pipes were also severed, bent or crushed outside of structures when connected tanks were displaced or buildings collapsed, although in many cases anchoring proved to be effective in avoiding displacement. Pipe support concrete columns in the open generally performed well. In some sites soil-liquefaction induced damage was evident, highlighting the need to consider potential site effects when selecting the location for a facility.
Joint Space Operations Center (JSpOC) Mission System Increment 2 (JMS Inc 2)
2016-03-01
Defense Acquisition Executive DoD - Department of Defense DoDAF - DoD Architecture Framework FD - Full Deployment FDD - Full Deployment Decision FY...date has slipped from September 2016 to December 2016 and FDD has slipped from October 2016 to March 2017 since the last MAIS Annual Report...testing. This added test time, in combination with funding reductions and the US Government furlough and shutdown in FY13, caused a total FDD slip
Shutdown system for a nuclear reactor
Groh, E.F.; Olson, A.P.; Wade, D.C.; Robinson, B.W.
1984-06-05
An ultimate shutdown system is provided for termination of neutronic activity in a nuclear reactor. The shutdown system includes bead chains comprising spherical containers suspended on a flexible cable. The containers are comprised of mating hemispherical shells which provide a ruggedized enclosure for reactor poison material. The bead chains, normally suspended above the reactor core on storage spools, are released for downward travel upon command from an external reactor monitor. The chains are capable of horizontal movement, so as to flow around obstructions in the reactor during their downward motion. 8 figs.
Shutdown system for a nuclear reactor
Groh, Edward F.; Olson, Arne P.; Wade, David C.; Robinson, Bryan W.
1984-01-01
An ultimate shutdown system is provided for termination of neutronic activity in a nuclear reactor. The shutdown system includes bead chains comprising spherical containers suspended on a flexible cable. The containers are comprised of mating hemispherical shells which provide a ruggedized enclosure for reactor poison material. The bead chains, normally suspended above the reactor core on storage spools, are released for downward travel upon command from an external reactor monitor. The chains are capable of horizontal movement, so as to flow around obstructions in the reactor during their downward motion.
Preliminary results of the mission profile life test of a 30 cm Hg bombardment thruster
NASA Technical Reports Server (NTRS)
Bechtel, R. T.; James, E. L.
1979-01-01
Long term tests were performed on a 30 cm Hg bombardment thruster and a power processing unit to determine lifetime characteristics. The thruster performance data and other operational characteristics taken at various times during the test segment are presented and evaluated with the life limiting mechanisms: discharge chamber erosion, deposition and spalling, external erosion, cathode degradation, and propellant isolator leakage. The control algorithms for thruster start up, steady state operation, throttle, detection and correction of off normal conditions, and shutdown are discussed.
40 CFR 62.14413 - When do the emission limits and stack opacity requirements apply?
Code of Federal Regulations, 2011 CFR
2011-07-01
... all times except during periods of startup, shutdown, or malfunction, provided that no hospital waste or medical/infectious waste is charged to your HMIWI during periods of startup, shutdown, or...
40 CFR 62.14413 - When do the emission limits and stack opacity requirements apply?
Code of Federal Regulations, 2012 CFR
2012-07-01
... all times except during periods of startup, shutdown, or malfunction, provided that no hospital waste or medical/infectious waste is charged to your HMIWI during periods of startup, shutdown, or...
40 CFR 62.14413 - When do the emission limits and stack opacity requirements apply?
Code of Federal Regulations, 2010 CFR
2010-07-01
... all times except during periods of startup, shutdown, or malfunction, provided that no hospital waste or medical/infectious waste is charged to your HMIWI during periods of startup, shutdown, or...
High-Speed Observer: Automated Streak Detection in SSME Plumes
NASA Technical Reports Server (NTRS)
Rieckoff, T. J.; Covan, M.; OFarrell, J. M.
2001-01-01
A high frame rate digital video camera installed on test stands at Stennis Space Center has been used to capture images of Space Shuttle main engine plumes during test. These plume images are processed in real time to detect and differentiate anomalous plume events occurring during a time interval on the order of 5 msec. Such speed yields near instantaneous availability of information concerning the state of the hardware. This information can be monitored by the test conductor or by other computer systems, such as the integrated health monitoring system processors, for possible test shutdown before occurrence of a catastrophic engine failure.
Ollson, Christopher A; Whitfield Aslund, Melissa L; Knopper, Loren D; Dan, Tereza
2014-01-01
The regions of Durham and York in Ontario, Canada have partnered to construct an energy-from-waste (EFW) thermal treatment facility as part of a long term strategy for the management of their municipal solid waste. In this paper we present the results of a comprehensive ecological risk assessment (ERA) for this planned facility, based on baseline sampling and site specific modeling to predict facility-related emissions, which was subsequently accepted by regulatory authorities. Emissions were estimated for both the approved initial operating design capacity of the facility (140,000 tonnes per year) and the maximum design capacity (400,000 tonnes per year). In general, calculated ecological hazard quotients (EHQs) and screening ratios (SRs) for receptors did not exceed the benchmark value (1.0). The only exceedances noted were generally due to existing baseline media concentrations, which did not differ from those expected for similar unimpacted sites in Ontario. This suggests that these exceedances reflect conservative assumptions applied in the risk assessment rather than actual potential risk. However, under predicted upset conditions at 400,000 tonnes per year (i.e., facility start-up, shutdown, and loss of air pollution control), a potential unacceptable risk was estimated for freshwater receptors with respect to benzo(g,h,i)perylene (SR=1.1), which could not be attributed to baseline conditions. Although this slight exceedance reflects a conservative worst-case scenario (upset conditions coinciding with worst-case meteorological conditions), further investigation of potential ecological risk should be performed if this facility is expanded to the maximum operating capacity in the future. © 2013.
Display-And-Alarm Circuit For Accelerometer
NASA Technical Reports Server (NTRS)
Bozeman, Richard J., Jr.
1995-01-01
Compact accelerometer assembly consists of commercial accelerometer retrofit with display-and-alarm circuit. Provides simple means for technician attending machine to monitor vibrations. Also simpifies automatic safety shutdown by providing local alarm or shutdown signal when vibration exceeds preset level.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-27
....m. in the Pentagon. Due to weather conditions and a federal government shutdown, the scheduled March... weather conditions and a federal government shutdown, the scheduled March 6, 2013 Board meeting is...
MODELING THE AMBIENT CONDITION EFFECTS OF AN AIR-COOLED NATURAL CIRCULATION SYSTEM
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hu, Rui; Lisowski, Darius D.; Bucknor, Matthew
The Reactor Cavity Cooling System (RCCS) is a passive safety concept under consideration for the overall safety strategy of advanced reactors such as the High Temperature Gas-Cooled Reactor (HTGR). One such variant, air-cooled RCCS, uses natural convection to drive the flow of air from outside the reactor building to remove decay heat during normal operation and accident scenarios. The Natural convection Shutdown heat removal Test Facility (NSTF) at Argonne National Laboratory (“Argonne”) is a half-scale model of the primary features of one conceptual air-cooled RCCS design. The facility was constructed to carry out highly instrumented experiments to study the performancemore » of the RCCS concept for reactor decay heat removal that relies on natural convection cooling. Parallel modeling and simulation efforts were performed to support the design, operation, and analysis of the natural convection system. Throughout the testing program, strong influences of ambient conditions were observed in the experimental data when baseline tests were repeated under the same test procedures. Thus, significant analysis efforts were devoted to gaining a better understanding of these influences and the subsequent response of the NSTF to ambient conditions. It was determined that air humidity had negligible impacts on NSTF system performance and therefore did not warrant consideration in the models. However, temperature differences between the building exterior and interior air, along with the outside wind speed, were shown to be dominant factors. Combining the stack and wind effects together, an empirical model was developed based on theoretical considerations and using experimental data to correlate zero-power system flow rates with ambient meteorological conditions. Some coefficients in the model were obtained based on best fitting the experimental data. The predictive capability of the empirical model was demonstrated by applying it to the new set of experimental data. The empirical model was also implemented in the computational models of the NSTF using both RELAP5-3D and STARCCM+ codes. Accounting for the effects of ambient conditions, simulations from both codes predicted the natural circulation flow rates very well.« less
Result from, and status of, EXO-200
NASA Astrophysics Data System (ADS)
Daniels, Tim; EXO-200 Collaboration
2017-01-01
EXO-200 has provided one of the most sensitive searches for neutrinoless double-beta decay utilizing 175 kg of enriched liquid xenon in an ultra-low background time projection chamber. This detector has demonstrated excellent energy resolution and background rejection capabilities. Using the first two years of data, EXO-200 has set a limit of 1 . 1 ×1025 y at 90 double-beta decay half-life of 136Xe. The experiment has experienced a brief hiatus in data taking during a temporary shutdown of its host facility: the Waste Isolation Pilot Plant. EXO-200 has resumed data taking in earnest with upgraded detector electronics. Results from the analysis of EXO-200 data and an update on the current status of EXO-200 will be presented.
NASA Astrophysics Data System (ADS)
Kaufman, Lisa; EXO-200 Collaboration
2017-09-01
The EXO-200 experiment has made both the first observation of the double beta decay in Xe-136 and the most precisely measured half-life of any two-neutrino double beta decay to date. Consisting of an extremely low-background time projection chamber filled with 150 kg of enriched liquid Xe-136, it has provided one of the most sensitive searches for the neutrinoless double beta decay using the first two years of data. After a hiatus in operations during a temporary shutdown of its host facility, the Waste Isolation Pilot Plant, the experiment has restarted data taking with upgrades to its front-end electronics and a radon suppression system. This talk will cover the latest results of the collaboration including new data with improved energy resolution.
Code of Federal Regulations, 2010 CFR
2010-07-01
..., and optional repeating of void discrete modes. 1065.525 Section 1065.525 Protection of Environment... repeating of void discrete modes. (a) Start the engine using one of the following methods: (1) Start the... during one of the modes of a discrete-mode test, you may void the results only for that individual mode...
40 CFR Appendix A to Subpart T of... - Test of Solvent Cleaning Procedures
Code of Federal Regulations, 2012 CFR
2012-07-01
.... Startup, shutdown, off D. None of the above ___ 5. When can parts or parts baskets be removed from the... that solvent drains from them freely. ___ 7. During startup, what must be turned on first, the primary... container C. Store in a bucket D. A or B ___ 11. What types of materials are prohibited from being cleaned...
40 CFR Appendix A to Subpart T of... - Test of Solvent Cleaning Procedures
Code of Federal Regulations, 2014 CFR
2014-07-01
.... Startup, shutdown, off D. None of the above ___ 5. When can parts or parts baskets be removed from the... that solvent drains from them freely. ___ 7. During startup, what must be turned on first, the primary... container C. Store in a bucket D. A or B ___ 11. What types of materials are prohibited from being cleaned...
40 CFR 63.11496 - What are the standards and compliance requirements for process vents?
Code of Federal Regulations, 2010 CFR
2010-07-01
...) Startup, shutdown, malfunction (SSM). Section 63.998(b)(2)(iii),(b)(6)(i)(A), and (d)(3) do not apply for.... (i) Startup, shutdown, and malfunction (SSM). References to SSM provisions in subparts that are...
40 CFR 63.11496 - What are the standards and compliance requirements for process vents?
Code of Federal Regulations, 2012 CFR
2012-07-01
...) Startup, shutdown, malfunction (SSM). Section 63.998(b)(2)(iii),(b)(6)(i)(A), and (d)(3) do not apply for.... (i) Startup, shutdown, and malfunction (SSM). References to SSM provisions in subparts that are...
40 CFR 63.11496 - What are the standards and compliance requirements for process vents?
Code of Federal Regulations, 2011 CFR
2011-07-01
...) Startup, shutdown, malfunction (SSM). Section 63.998(b)(2)(iii),(b)(6)(i)(A), and (d)(3) do not apply for.... (i) Startup, shutdown, and malfunction (SSM). References to SSM provisions in subparts that are...
40 CFR 63.9610 - What are my general requirements for complying with this subpart?
Code of Federal Regulations, 2011 CFR
2011-07-01
... section at all times, except during periods of startup, shutdown, and malfunction. The terms startup... develop a written startup, shutdown, and malfunction plan according to the provisions in § 63.6(e)(3). [68...
Buffer thermal energy storage for a solar Brayton engine
NASA Technical Reports Server (NTRS)
Strumpf, H. J.; Barr, K. P.
1981-01-01
A study has been completed on the application of latent-heat buffer thermal energy storage to a point-focusing solar receiver equipped with an air Brayton engine. To aid in the study, a computer program was written for complete transient/stead-state Brayton cycle performance. The results indicated that thermal storage can afford a significant decrease in the number of engine shutdowns as compared to operating without thermal storage. However, the number of shutdowns does not continuously decrease as the storage material weight increases. In fact, there appears to be an optimum weight for minimizing the number of shutdowns.
Confirmation of shutdown cooling effects
NASA Astrophysics Data System (ADS)
Sato, Kotaro; Tabuchi, Masato; Sugimura, Naoki; Tatsumi, Masahiro
2015-12-01
After the Fukushima accidents, all nuclear power plants in Japan have gradually stopped their operations and have long periods of shutdown. During those periods, reactivity of fuels continues to change significantly especially for high-burnup UO2 fuels and MOX fuels due to radioactive decays. It is necessary to consider these isotopic changes precisely, to predict neutronics characteristics accurately. In this paper, shutdown cooling (SDC) effects of UO2 and MOX fuels that have unusual operation histories are confirmed by the advanced lattice code, AEGIS. The calculation results show that the effects need to be considered even after nuclear power plants come back to normal operation.
Study on regional air quality impact from a chemical plant emergency shutdown.
Ge, Sijie; Wang, Sujing; Xu, Qiang; Ho, Thomas
2018-06-01
Emergency shutdowns of chemical plants (ESCP) inevitably generate intensive and huge amounts of VOCs and NO x emissions through flaring that can cause highly localized and transient air pollution events with elevated ozone concentrations. However, quantitative studies of regional ozone impact due to ESCP, in terms of how ESCP would affect and to what extent ESCP could impact, are still lacking. This paper reports a systematic study on regional air quality impact from an olefin plant emergency shutdown due to the sudden failure of its cracked gas compressor (CGC). It demonstrates that emergency shutdown may cause significant ozone increment subject to different factors such as the starting time of emergency shutdown, flare destruction and removal efficiency (DRE) and plant location. In our studied case, the 8-hr ozone increment ranges from 0.4 to 3.3 ppb under different starting time, from 3.3 to 24.8 ppb under different DRE, and from 1.6 to 3.3 ppb under different locations. The results enable us to understand how and to what extent emergency operating activities of the chemical process will affect local air quality, which might be beneficial for decision makings on emergency air-quality response and control in the future. Copyright © 2018 Elsevier Ltd. All rights reserved.
A 9700-hour durability test of a five centimeter diameter ion thruster
NASA Technical Reports Server (NTRS)
Nakanishi, S.; Finke, R. C.
1973-01-01
A modified Hughes SIT-5 thrustor has been life-tested at the Lewis Research Center. The final 2700 hours of the test are described with a charted history of thrustor operating parameters and off-normal events. Performance and operating characteristics were nearly constant throughout the test except for neutralizer heater power requirements and accelerator drain current. A post-shutdown inspection revealed sputter erosion of ion chamber components and component flaking of sputtered metal. Several flakes caused beamlet divergence and anomalous grid erosion, causing the test to be terminated. All sputter erosion sources have been identified and promising sputter resistant components are currently being evaluated.
Despite the Shutdown, Rescheduled NIH Research Festival Brings Science to the Forefront | Poster
By Andrea Frydl, Contributing Writer Although it was delayed by almost a month because of the federal shutdown, the NIH Research Festival still took place at the NIH Clinical Center in Bethesda, Md., and attendance was high.
Choi, Jiyun; Cho, Hyunseok; Lee, Seungmin; Kim, Juyeong; Park, Eun-Cheol
2018-05-01
Internet addiction has emerged as a major public health problem worldwide. In November 2011, the South Korean government implemented an online game shutdown policy, lasting from 12:00 to 6:00 am, as a means of preventing Internet addiction in adolescents aged 15 or below. This study analyzed the effect of this shutdown policy on adolescent Internet use, addiction, and sleeping hours. We analyzed data collected from the Korea Youth Risk Behavior Web-based Survey from 2011 to 2015. Respondents were divided into two groups by age: aged 15 or below (male = 76,048, female = 66,281) and aged 16 or above (male = 52,568, female = 49,060). A difference-in-difference analysis was used to evaluate the effect of this shutdown policy. In 2012, which is immediately following policy enforcement, daily amount of Internet use (in minutes) decreased more in adolescents affected by the policy (i.e., the aged 15 or below group). However, it steadily increased in 2013, 2014, 2015, and showed no meaningful long-term improvements 4 years after policy implementation (-3.648 minutes in 2012 [p = .001], -3.204 minutes in 2013 [p = .011], -1.140 minutes in 2014 [p = .384], and 2.190 minutes in 2015 [p = .107]). The shutdown policy did not alter Internet addiction or sleeping hours. Interestingly, female adolescents, adolescents with low academic performance, and adolescents with low exercise levels exhibited comparatively stronger and longer lasting initial declines in Internet usage. The shutdown policy had practically insignificant effects in reducing Internet use for target adolescents. Thus, policymakers aiming to reduce or prevent Internet addiction should use different strategies. Copyright © 2017 The Society for Adolescent Health and Medicine. Published by Elsevier Inc. All rights reserved.
Efforts to control radiation build-up in Ringhals
DOE Office of Scientific and Technical Information (OSTI.GOV)
Egner, K.; Aronsson, P.O.; Erixon, O.
1995-03-01
It is well known that good control of the primary chemistry in a PWR is essential in order to minimize material problems and fuel damages. It has also been well established that the water chemistry has a great influence on accumulation of corrosion products on the fuel and the radiation build-up on primary system surfaces. Ringhals was one of the pioneers to increase operating pH in order to reduce radiation build-up and has now been operating for ten years with pH at 7.4 or (in later years) 7.2. Our experience is favourable and includes low radiation levels in the newmore » (1989) steam generators of Ringhals 2. Ringhals 4 has operated almost its whole life at pH 7.2 or higher and it remains one of the cleanest PWRs of its vintage. In addition to strict adherence to a stable operating chemistry, Ringhals is now working on a program with the aim to find optimum shut-down and start-up chemistry to reduce activity levels in the primary systems. A particular goal is to use the shut-down and start-up chemistry at the 1994 outage in Ringhals 3 in order to reduce doserates in preparation for the planned steam generator replacement in 1995. The paper summarizes the experience to date of the established operating chemistry, on-going tests with modified shut-down and start-up chemistry and other measures to limit or reduce the activity build-up.« less
Code of Federal Regulations, 2014 CFR
2014-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING AUTOMATIC AUXILIARY BOILERS General Requirements § 63.15-7 Alarms. (a) An audible alarm must automatically sound when a flame safety system shutdown occurs. A visible indicator must indicate that the shutdown was caused by the flame safety system...
Code of Federal Regulations, 2012 CFR
2012-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING AUTOMATIC AUXILIARY BOILERS General Requirements § 63.15-7 Alarms. (a) An audible alarm must automatically sound when a flame safety system shutdown occurs. A visible indicator must indicate that the shutdown was caused by the flame safety system...
Code of Federal Regulations, 2011 CFR
2011-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING AUTOMATIC AUXILIARY BOILERS General Requirements § 63.15-7 Alarms. (a) An audible alarm must automatically sound when a flame safety system shutdown occurs. A visible indicator must indicate that the shutdown was caused by the flame safety system...
Code of Federal Regulations, 2013 CFR
2013-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING AUTOMATIC AUXILIARY BOILERS General Requirements § 63.15-7 Alarms. (a) An audible alarm must automatically sound when a flame safety system shutdown occurs. A visible indicator must indicate that the shutdown was caused by the flame safety system...
Code of Federal Regulations, 2010 CFR
2010-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING AUTOMATIC AUXILIARY BOILERS General Requirements § 63.15-7 Alarms. (a) An audible alarm must automatically sound when a flame safety system shutdown occurs. A visible indicator must indicate that the shutdown was caused by the flame safety system...
40 CFR 63.310 - Requirements for startups, shutdowns, and malfunctions.
Code of Federal Regulations, 2013 CFR
2013-07-01
... plan, the owner or operator may use the standard operating procedures manual for the battery, provided... startup, shutdown, and malfunction plan that describes procedures for operating the battery, including... (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE...
40 CFR 63.310 - Requirements for startups, shutdowns, and malfunctions.
Code of Federal Regulations, 2011 CFR
2011-07-01
... plan, the owner or operator may use the standard operating procedures manual for the battery, provided... startup, shutdown, and malfunction plan that describes procedures for operating the battery, including... (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE...
40 CFR 63.310 - Requirements for startups, shutdowns, and malfunctions.
Code of Federal Regulations, 2010 CFR
2010-07-01
... plan, the owner or operator may use the standard operating procedures manual for the battery, provided... startup, shutdown, and malfunction plan that describes procedures for operating the battery, including... (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE...
40 CFR 63.310 - Requirements for startups, shutdowns, and malfunctions.
Code of Federal Regulations, 2014 CFR
2014-07-01
... plan, the owner or operator may use the standard operating procedures manual for the battery, provided... startup, shutdown, and malfunction plan that describes procedures for operating the battery, including... (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE...
Book Newsroom Newsroom News and features Press releases Photo gallery Fact sheets and brochures Media Tevatron experiments Tevatron operation Shutdown process For the media Video of shutdown event Guest book Quick Links Home Contact Phone Book Fermilab at Work For Industry Jobs Interact Facebook Twitter
40 CFR 63.2250 - What are the general requirements?
Code of Federal Regulations, 2012 CFR
2012-07-01
..., except during periods of process unit or control device startup, shutdown, and malfunction; prior to process unit initial startup; and during the routine control device maintenance exemption specified in... practice requirements are not operating, or during periods of startup, shutdown, and malfunction. Startup...
40 CFR 63.2250 - What are the general requirements?
Code of Federal Regulations, 2013 CFR
2013-07-01
..., except during periods of process unit or control device startup, shutdown, and malfunction; prior to process unit initial startup; and during the routine control device maintenance exemption specified in... practice requirements are not operating, or during periods of startup, shutdown, and malfunction. Startup...
40 CFR 63.2250 - What are the general requirements?
Code of Federal Regulations, 2014 CFR
2014-07-01
..., except during periods of process unit or control device startup, shutdown, and malfunction; prior to process unit initial startup; and during the routine control device maintenance exemption specified in... practice requirements are not operating, or during periods of startup, shutdown, and malfunction. Startup...
40 CFR 63.1354 - Reporting requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
... owner or operator during a startup, shutdown, or malfunction of an affected source (including actions taken to correct a malfunction) are consistent with the procedures specified in the source's startup... information in a semiannual report. Reports shall only be required if a startup, shutdown, or malfunction...
40 CFR 60.51Da - Reporting requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... excluded from the calculation of average emission rates because of startup, shutdown, malfunction (NOX only... than startup, shutdown, malfunction, or emergency conditions. (6) Identification of “F” factor used for calculations, method of determination, and type of fuel combusted. (7) Identification of times when hourly...
Olivieri, Daniel; Senti, Kirsten-André; Subramanian, Sailakshmi; Sachidanandam, Ravi; Brennecke, Julius
2012-09-28
In animal gonads, PIWI proteins and their bound 23-30 nt piRNAs guard genome integrity by the sequence specific silencing of transposons. Two branches of piRNA biogenesis, namely primary processing and ping-pong amplification, have been proposed. Despite an overall conceptual understanding of piRNA biogenesis, identity and/or function of the involved players are largely unknown. Here, we demonstrate an essential role for the female sterility gene shutdown in piRNA biology. Shutdown, an evolutionarily conserved cochaperone collaborates with Hsp90 during piRNA biogenesis, potentially at the loading step of RNAs into PIWI proteins. We demonstrate that Shutdown is essential for both primary and secondary piRNA populations in Drosophila. An extension of our study to previously described piRNA pathway members revealed three distinct groups of biogenesis factors. Together with data on how PIWI proteins are wired into primary and secondary processing, we propose a unified model for piRNA biogenesis. Copyright © 2012 Elsevier Inc. All rights reserved.
The prepared mind. [Serendipitous discovery of demulsifier
DOE Office of Scientific and Technical Information (OSTI.GOV)
Thompson, N.E.S.
Products derived from the work of scientists with serendipity, or an imagined faculty for making fluke discoveries by looking for one thing and finding another, include the well-known examples of Teflon, penicillin, X-rays, Velcro, nylon, saccharin, and Nutrasweet. This dream of every scientist came true for the author in the discovery of a dithiocarbamate compound that could be used as a water-clarifying agent for oil fields that produce water. The new agent enables oil companies to discharge water produced in offshore drilling facilities without upsetting the clarity of the aquatic environment. The EPA limit for oil in discharged water ismore » 48 ppm. Failure to maintain this limit will result in shutdown of the platform. The alternative is to pipe the produced water to onshore facilities for treatment before discharge, which costs a good bit more. The serendipitous discovery of the dithiocarbamate compound discussed here as a unique water-clarifying agent has also led to important fundamental advances. The new agent allows producers to use existing water treatment equipment and remain in compliance with the latest limits on oil content. This compound has made it more economical to operate offshore oil and gas production facilities in the Gulf of Mexico and the North Sea.« less
Antarctic Projects Stymied by the Shutdown
NASA Astrophysics Data System (ADS)
Showstack, Randy
2013-10-01
The U.S. federal government shutdown coincided with the beginning of the Antarctic austral summer research window, and many scientists told Eos they are deeply concerned about the impacts on research there. John Priscu, a lead principal investigator with the Whillans Ice Stream Subglacial Access Research Drilling (WISSARD) project in West Antarctica, said the government shutdown "threw us a curve that I did not anticipate or plan for." Pricsu, who has spent 30 seasons working in Antarctica under federal funding, said that a hole in the project's long-term data set "will have a major impact on the models we are developing to examine climate-induced changes" in Antarctic ecosystems.
Carlson, Steven Allen; Anakor, Ifenna Kingsley; Farrell, Greg Robert
2015-06-30
The present invention pertains to electrochemical cells which comprise (a) an anode; (b) a cathode; (c) a solid porous separator, such as a polyolefin, xerogel, or inorganic oxide separator; and (d) a nonaqueous electrolyte, wherein the separator comprises a porous membrane having a microporous coating comprising polymer particles which have not coalesced to form a continuous film. This microporous coating on the separator acts as a safety shutdown layer that rapidly increases the internal resistivity and shuts the cell down upon heating to an elevated temperature, such as 110.degree. C. Also provided are methods for increasing the safety of an electrochemical cell by utilizing such separators with a safety shutdown layer.
Aileron controls for wind turbine applications
NASA Technical Reports Server (NTRS)
Miller, D. R.; Putoff, R. L.
1984-01-01
Horizontal axis wind turbines which utilize partial or full variable blade pitch to regulate rotor speed were examined. The weight and costs of these systems indicated a need for alternate methods of rotor control. Aileron control is an alternative which has potential to meet this need. Aileron control rotors were tested on the Mod-O wind turbine to determine their power regulation and shutdown characteristics. Test results for a 20 and 38% chord aileron control rotor are presented. Test is shown that aileron control is a viable method for safety for safely controlling rotor speed, following a loss of general load.
NASA Technical Reports Server (NTRS)
2005-01-01
KENNEDY SPACE CENTER, FLA. Patricia Slinger (left), a test engineer, and Monica Hagley, an avionics test engineer, look at a replacement orbiter point sensor chassis. Components are being tested to determine why one of the four liquid hydrogen tank low- level fuel cut-off sensors failed in a routine prelaunch check during the launch countdown July 13. The failure caused mission managers to scrub Discovery's first launch attempt. The sensor protects the Shuttle's main engines by triggering their shutdown in the event fuel runs unexpectedly low. The sensor is one of four inside the liquid hydrogen section of the External Tank (ET).
Aileron controls for wind turbine applications
NASA Technical Reports Server (NTRS)
Miller, D. R.; Puthoff, R. L.
1984-01-01
Horizontal axis wind turbines which utilize partial or full variable blade pitch to regulate rotor speed were examined. The weight and costs of these systems indicated a need for alternate methods of rotor control. Aileron control is an alternative which has potential to meet this need. Aileron control rotors were tested on the Mod-O wind turbine to determine their power regulation and shutdown characteristics. Test results for a 20 and 38 percent chord aileron control rotor are presented. Test is shown that aileron control is a viable method for safety for safely controlling rotor speed, following a loss of general load.
Isotope shortage triggers delays for patients
NASA Astrophysics Data System (ADS)
Gould, Paula
2009-07-01
An unplanned shutdown of a nuclear reactor in Canada is disrupting the supply of medical isotopes across North America and forcing some hospitals to cancel or postpone patients' tests. The closure of the National Research Universal (NRU) reactor in Chalk River, Ontario, has also embarrassed Canadian officials, including a senior government minister who was forced to apologize after calling the isotope shortage a "sexy" career challenge.
40 CFR Appendix A to Subpart T of... - Test of Solvent Cleaning Procedures
Code of Federal Regulations, 2011 CFR
2011-07-01
... condenser or the sump heater? A. Primary condenser B. Sump heater C. Turn both on at same time D. Either A or B is correct ___ 8. During shutdown, what must be turned off first, the primary condenser or the sump heater? A. Primary condenser B. Sump heater C. Turn both off at same time D. Either A or B is...
Gear Fatigue Diagnostics and Prognostics
2013-01-01
motivated by the fact that one must use pragmatic, sub-optimal sensor placement in practical applications due to space and other constraints. Fig...digital output from the LabVIEW monitor application is connected to the Mustang Dynamometer "shutdown" digital input port, and will cause a test...the signal 4 Raw_Crest_Factor Swansson, N.S. Application of Vibration Signal Analysis Techniques to Signal Monitoring. Conference on Friction and
1981-06-01
shutdown. Before start up the hot oil would be pumped ( auxillary pump) back through the engine on the high pressure side of the engine’ s oil pump. This...insulation heating was applied. Temperature plots Figure 14* to Figure 16* show the battery cooling curves for auxillary heating when 37mm of medium
DOE Office of Scientific and Technical Information (OSTI.GOV)
Maienschein, J.L.; Garcia, F.; Garza, R.G.
Tritium-handling apparatus has been decontaminated as part of the shutdown of the LLNL Tritium Facility. Two stainless-steel gloveboxes that had been used to process lithium deuteride-tritide (LiDT) salt were decontaminated using the Portable Cleanup System so that they could be flushed with room air through the facility ventilation system. Further surface decontamination was performed by scrubbing the interior with paper towels and ethyl alcohol or Swish{trademark}. The surface contamination, as shown by swipe surveys, was reduced from 4{times}10{sup 4}--10{sup 6} disintegrations per minute (dpm)/cm{sup 2} to 2{times}10{sup 2}--4{times}10{sup 4} dpm/cm{sup 2}. Details on the decontamination operation are provided. A seriesmore » of metal (palladium and vanadium) hydride storage beds have been drained of tritium and flushed with deuterium in order to remove as much tritium as possible. The bed draining and flushing procedure is described, and a calculational method is presented which allows estimation of the tritium remaining in a bed after it has been drained and flushed. Data on specific bed draining and flushing are given.« less
Ryu, Hee Wook; Cho, Kyung-Suk; Lee, Tae-Ho
2011-04-01
The performance of a pilot-scale anti-clogging biofilter system (ABS) was evaluated over a period of 125days for treating ammonia and volatile organic compounds emitted from a full-scale food waste-composting facility. The pilot-scale ABS was designed to intermittently and automatically remove excess biomass using an agitator. When the pressure drop in the polyurethane filter bed was increased to a set point (50 mm H(2)O m(-1)), due to excess biomass acclimation, the agitator automatically worked by the differential pressure switch, without biofilter shutdown. A high removal efficiency (97-99%) was stably maintained for the 125 days after an acclimation period of 1 week, even thought the inlet gas concentrations fluctuated from 0.16 to 0.55 g m(-3). Due the intermittent automatic agitation of the filter bed, the biomass concentration and pressure drop in the biofilter were maintained within the ranges of 1.1-2.0 g-DCW g PU(-1) and below 50 mm H(2)O m(-1), respectively. Copyright © 2011 Elsevier Ltd. All rights reserved.
Timely topics on spent fuel storage
DOE Office of Scientific and Technical Information (OSTI.GOV)
Selin, I.
1994-12-31
The history of spent fuel management in this country has taken several turns, with a final resolution still out of reach. Several repository programs started, stalled ans stopped. The latest effort at Yucca Mountain is progressing but, at best, is years from the early phases of licensing, much less the actual underground disposal of spent fuel. A monitored retrieval storage [MRS] facility was expected to start accepting commercial spent fuel beginning in 1998, but no such facility is clearly on the horizon. All of these recent developments changed the circumstances that we face in spent fuel management. The obvious conclusionmore » is that an increasing number of plants, both operating and permanently shut-down reactors, will have to provide for additional spent fuel storage on-site for a longer period than originally planned, and even after plant decommissioning, prudence requires that provision be made for continual, stand-alone, on-site storage. After pool capacity is reached, most utilities opt for some sort of dry storage. But the dry storage option has triggered an unprecedented amount of local opposition at many sites, further taxing NRC and industry resources.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tom Elicson; Bentley Harwood; Jim Bouchard
Over a 12 month period, a fire PRA was developed for a DOE facility using the NUREG/CR-6850 EPRI/NRC fire PRA methodology. The fire PRA modeling included calculation of fire severity factors (SFs) and fire non-suppression probabilities (PNS) for each safe shutdown (SSD) component considered in the fire PRA model. The SFs were developed by performing detailed fire modeling through a combination of CFAST fire zone model calculations and Latin Hypercube Sampling (LHS). Component damage times and automatic fire suppression system actuation times calculated in the CFAST LHS analyses were then input to a time-dependent model of fire non-suppression probability. Themore » fire non-suppression probability model is based on the modeling approach outlined in NUREG/CR-6850 and is supplemented with plant specific data. This paper presents the methodology used in the DOE facility fire PRA for modeling fire-induced SSD component failures and includes discussions of modeling techniques for: • Development of time-dependent fire heat release rate profiles (required as input to CFAST), • Calculation of fire severity factors based on CFAST detailed fire modeling, and • Calculation of fire non-suppression probabilities.« less
Code of Federal Regulations, 2011 CFR
2011-01-01
... to bring and maintain the plant in safe shutdown (non-design basis accident). Applicant means a... Document Control Desk. Nuclear reactor means an apparatus, other than an atomic weapon, designed or used to... from the Restricted Data category pursuant to section 142 of the Act. Safe shutdown (non-design basis...
Code of Federal Regulations, 2014 CFR
2014-01-01
... to bring and maintain the plant in safe shutdown (non-design basis accident). Applicant means a... Document Control Desk. Nuclear reactor means an apparatus, other than an atomic weapon, designed or used to... from the Restricted Data category pursuant to section 142 of the Act. Safe shutdown (non-design basis...
Code of Federal Regulations, 2012 CFR
2012-01-01
... to bring and maintain the plant in safe shutdown (non-design basis accident). Applicant means a... Document Control Desk. Nuclear reactor means an apparatus, other than an atomic weapon, designed or used to... from the Restricted Data category pursuant to section 142 of the Act. Safe shutdown (non-design basis...
Code of Federal Regulations, 2013 CFR
2013-01-01
... to bring and maintain the plant in safe shutdown (non-design basis accident). Applicant means a... Document Control Desk. Nuclear reactor means an apparatus, other than an atomic weapon, designed or used to... from the Restricted Data category pursuant to section 142 of the Act. Safe shutdown (non-design basis...
Code of Federal Regulations, 2012 CFR
2012-10-01
... transmitters shall incorporate a programmable means to implement a system shutdown process in the event of... transmitters shall incorporate a programmable means to implement a system shutdown process in the event of...
Code of Federal Regulations, 2011 CFR
2011-07-01
... operation. A unit operation may have more than one batch emission episode per batch cycle. For example, a... shutdowns and during periods not associated with a shutdown. Examples of activities that can generate... management units such as an air flotation unit, clarifier, or biological treatment unit. Examples of an oil...
Code of Federal Regulations, 2014 CFR
2014-07-01
... operation. A unit operation may have more than one batch emission episode per batch cycle. For example, a... shutdowns and during periods not associated with a shutdown. Examples of activities that can generate... management units such as an air flotation unit, clarifier, or biological treatment unit. Examples of an oil...
Code of Federal Regulations, 2012 CFR
2012-07-01
... operation. A unit operation may have more than one batch emission episode per batch cycle. For example, a... shutdowns and during periods not associated with a shutdown. Examples of activities that can generate... management units such as an air flotation unit, clarifier, or biological treatment unit. Examples of an oil...
Code of Federal Regulations, 2010 CFR
2010-07-01
... operation. A unit operation may have more than one batch emission episode per batch cycle. For example, a... shutdowns and during periods not associated with a shutdown. Examples of activities that can generate... management units such as an air flotation unit, clarifier, or biological treatment unit. Examples of an oil...
Code of Federal Regulations, 2013 CFR
2013-07-01
... operation. A unit operation may have more than one batch emission episode per batch cycle. For example, a... shutdowns and during periods not associated with a shutdown. Examples of activities that can generate... management units such as an air flotation unit, clarifier, or biological treatment unit. Examples of an oil...
Book Newsroom Newsroom News and features Press releases Photo gallery Fact sheets and brochures Media Tevatron experiments Tevatron operation Shutdown process For the media Video of shutdown event Guest book Cookies Quick Links Home Contact Phone Book Fermilab at Work For Industry Jobs Interact Facebook Twitter
Book Newsroom Newsroom News and features Press releases Photo gallery Fact sheets and brochures Media Tevatron experiments Tevatron operation Shutdown process For the media Video of shutdown event Guest book Links Home Contact Phone Book Fermilab at Work For Industry Jobs Interact Facebook Twitter Instagram
DOE Office of Scientific and Technical Information (OSTI.GOV)
Palomar, J.; Wyman, R.
This document provides recommendations to guide reviewers in the application of Programmable Logic Controllers (PLCS) to the control, monitoring and protection of nuclear reactors. The first topics addressed are system-level design issues, specifically including safety. The document then discusses concerns about the PLC manufacturing organization and the protection system engineering organization. Supplementing this document are two appendices. Appendix A summarizes PLC characteristics. Specifically addressed are those characteristics that make the PLC more suitable for emergency shutdown systems than other electrical/electronic-based systems, as well as characteristics that improve reliability of a system. Also covered are PLC characteristics that may create anmore » unsafe operating environment. Appendix B provides an overview of the use of programmable logic controllers in emergency shutdown systems. The intent is to familiarize the reader with the design, development, test, and maintenance phases of applying a PLC to an ESD system. Each phase is described in detail and information pertinent to the application of a PLC is pointed out.« less
NASA Advanced Radiator Technology Development
NASA Astrophysics Data System (ADS)
Koester, J. Kent; Juhasz, Albert J.
1994-07-01
A practical implementation of the two-phase working fluid of lithium and NaK has been developed experimentally for pumped loop radiator designs. The benefits of the high heat capacity and low mass of lithium have been integrated with the shutdown capability enabled by the low freezing temperature of NaK by mixing these liquid metals directly. The stable and reliable start up and shutdown of a lithium/NaK pumped loop has been demonstrated through the development of a novel lithium freeze-separation technique within the flowing header ducts. The results of a highly instrumented liquid metal test loop are presented in which both lithium fraction as well as loop gravitational effects were varied over a wide range of values. Diagnostics based on dual electric probes are presented in which the convective behavior of the lithium component is directly measured during loop operation. The uniform distribution of the lithium after a freeze separation is verified by neutron radiography. The operating regime for reliable freeze/thaw flow behavior is described in terms of correlations based on dimensional analysis.
Learning Design at White Sands Test Facility
NASA Technical Reports Server (NTRS)
Grotewiel, Shane
2010-01-01
During the Fall of 2010, I spent my time at NASA White Sands Test Facility in Las Cruces, NM as an Undergraduate Student Research Program (USRP) Intern. During that time, I was given three projects to work on: Large Altitude Simulation System (LASS) basket strainer, log books, and the design of a case for touch screen monitors used for simulations. I spent most of my time on the LASS basket strainer. The LASS system has a water feed line with a basket strainer that filters out rust. In 2009, there were three misfires which cost approximately $27,000 and about 8% of the allotted time. The strainer was getting a large change in pressure that would result in a shutdown of the system. I have designed a new basket that will eliminate the large pressure change and it can be used with the old basket strainer housing. The LASS system has three steam generators (modules). Documents pertaining to these modules are stored electronically, and the majority of the documents are not able to be searched with keywords, so they have to be gone through one by one. I have come up with an idea on how to organize these files so that the Propulsion Department may efficiently search through the documents needed. Propulsion also has a LASS simulator that incorporates two touch screen monitors. Currently these monitors are in six foot by two foot metal cabinet on wheels. During simulation these monitors are used in the block house and need to be taken out of the block house when not in use. I have designed different options for hand held cases for storing and transporting the monitors in and out of the block house. The three projects previously mentioned demonstrate my contributions to the Propulsion Department and have taught me real world experience that is essential in becoming a productive engineer.
NASA Technical Reports Server (NTRS)
Melcher, J. C.; Morehead, Robert L.
2014-01-01
The Project Morpheus liquid oxygen (LOX) / liquid methane rocket engines demonstrated acousticcoupled combustion instabilities during sea-level ground-based testing at the NASA Johnson Space Center (JSC) and Stennis Space Center (SSC). High-amplitude, 1T, 1R, 1T1R (and higher order) modes appear to be triggered by injector conditions. The instability occurred during the Morpheus-specific engine ignition/start sequence, and did demonstrate the capability to propagate into mainstage. However, the instability was never observed to initiate during mainstage, even at low power levels. The Morpheus main engine is a JSC-designed 5,000 lbf-thrust, 4:1 throttling, pressure-fed cryogenic engine using an impinging element injector design. Two different engine designs, named HD4 and HD5, and two different builds of the HD4 engine all demonstrated similar instability characteristics. Through the analysis of more than 200 hot fire tests on the Morpheus vehicle and SSC test stand, a relationship between ignition stability and injector/chamber pressure was developed. The instability has the distinct characteristic of initiating at high relative injection pressure drop (dP) at low chamber pressure (Pc); i.e., instabilities initiated at high dP/Pc at low Pc during the start sequence. The high dP/Pc during start results during the injector /chamber chill-in, and is enhanced by hydraulic flip in the injector orifice elements. Because of the fixed mixture ratio of the existing engine design (the main valves share a common actuator), it is not currently possible to determine if LOX or methane injector dP/Pc were individual contributors (i.e., LOX and methane dP/Pc typically trend in the same direction within a given test). The instability demonstrated initiation characteristic of starting at or shortly after methane injector chillin. Colder methane (e.g., sub-cooled) at the injector inlet prior to engine start was much more likely to result in an instability. A secondary effect of LOX sub-cooling was also possibly observed; greater LOX sub- cooling improved stability. Some tests demonstrated a low-amplitude 1L-1T instability prior to LOX injector chill-in. The Morpheus main engine also demonstrated chug instabilities during some engine shutdown sequences on the flight vehicle and SSC test stand. The chug instability was also infrequently observed during the startup sequence. The chug instabilities predictably initiated at low dP/Pc at low Pc. The chug instabilities were always self-limiting; startup chug instabilities terminated during throttle-up and shutdown chug instabilities decayed by shutdown termination.
Recovering Aerodynamic Side Loads on Rocket Nozzles using Quasi-Static Strain-Gage Measurements
NASA Technical Reports Server (NTRS)
Brown, Andrew; Ruf, Joseph H.; McDaniels, David M.
2009-01-01
During over-expanded operation of rocket nozzles, which is defined to be when the exit pressure is greater than internal pressure over some part of the nozzle, the nozzle will experience a transverse forcing function due to the pressure differential across the nozzle wall. Over-expansion occurs during the nozzle start-up and shutdown transient, even in high-altitude engines, because most test facilities cannot completely reproduce the near-vacuum pressures at those altitudes. During this transient, the pressure differential moves axially down the nozzle as it becomes pressurized, but this differential is never perfectly symmetric circumferentially. The character of the forcing function is highly complex and defined by a series of restricted and free shock separations. The subject of this paper is the determination of the magnitude of this loading during sub-scale testing via measurement of the structural dynamic response of the nozzle and its support structure. An initial attempt at back-calculating this load using the inverse of the transfer function was performed, but this attempt was shown to be highly susceptible to numerical error. The final method chosen was to use statically calibrated strain data and to filter out the system fundamental frequency such that the measured response yields close to the correct dynamic loading function. This method was shown to capture 93% of the pressure spectral energy using controlled load shaker testing. This method is one of the only practical ways for the inverse determination of the forcing function for non-stationary excitations, and, to the authors' knowledge, has not been described in the literature to date.
news For the media Particle Physics Neutrinos Fermilab and the LHC Dark matter and dark energy ADMX discoveries Questions for the universe Ask a scientist Tevatron Tevatron Timeline Tevatron accelerator Tevatron experiments Tevatron operation Shutdown process For the media Video of shutdown event Guest book
Fermilab | Tevatron | Interactive Timeline
Process Looking Ahead For the Media Video of Shutdown Event Guest Book TevatronImpact June 11, 2012 About the Symposium Symposium Agenda Travel & Lodging List of Registrants Organizing Committee Follow in the News Quantum Diaries Tevatron Home Looking Ahead For the Media Shutdown Event Previous Next
40 CFR 63.310 - Requirements for startups, shutdowns, and malfunctions.
Code of Federal Regulations, 2012 CFR
2012-07-01
... CATEGORIES National Emission Standards for Coke Oven Batteries § 63.310 Requirements for startups, shutdowns... or operator shall operate and maintain the coke oven battery and its pollution control equipment... operator of a coke oven battery shall develop, according to paragraph (c) of this section, a written...
46 CFR 153.296 - Emergency shutdown stations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... shutdown station must contain a single remote actuator for all quick closing shutoff valves required by... on the tankship. (f) Any remote emergency actuator, such as that for a quick closing shut-off valve... remote emergency actuators. The emergency action must occur whether one or several actuators are operated...
Book Newsroom Newsroom News and features Press releases Photo gallery Fact sheets and brochures Media Tevatron experiments Tevatron operation Shutdown process For the media Video of shutdown event Guest book check on holiday hours or check the Lederman Science Center website. Groups of six or more must book a
Book Newsroom Newsroom News and features Press releases Photo gallery Fact sheets and brochures Media Tevatron experiments Tevatron operation Shutdown process For the media Video of shutdown event Guest book Science Security, Privacy, Legal Use of Cookies Quick Links Home Contact Phone Book Fermilab at Work For
Fermilab | Contact Fermilab | Email Fermilab
Book Newsroom Newsroom News and features Press releases Photo gallery Fact sheets and brochures Media Tevatron experiments Tevatron operation Shutdown process For the media Video of shutdown event Guest book , Legal Use of Cookies Quick Links Home Contact Phone Book Fermilab at Work For Industry Jobs Interact