Sample records for test plan development

  1. Systems design study of the Pioneer Venus spacecraft. Volume 2. Preliminary program development plan

    NASA Technical Reports Server (NTRS)

    1973-01-01

    The preliminary development plan for the Pioneer Venus program is presented. This preliminary plan treats only developmental aspects that would have a significant effect on program cost. These significant development areas were: master program schedule planning; test planning - both unit and system testing for probes/orbiter/ probe bus; ground support equipment; performance assurance; and science integration Various test planning options and test method techniques were evaluated in terms of achieving a low-cost program without degrading mission performance or system reliability. The approaches studied and the methodology of the selected approach are defined.

  2. MCC/shuttle test plan. Volume 1: Philosophy and guidelines

    NASA Technical Reports Server (NTRS)

    1976-01-01

    The Mission Control Center/Shuttle Test Plan is defined from development through operations to a level of detail which will support the National Aeronautics and Space Administration and contractor management in the following areas: test management, test tool development, and resource and schedule planning.

  3. Enterprise Architecture Planning in developing A planning Information System: a Case Study of Semarang State University

    NASA Astrophysics Data System (ADS)

    Budiman, Kholiq; Prahasto, Toni; Kusumawardhani, Amie

    2018-02-01

    This research has applied an integrated design and development of planning information system, which is been designed using Enterprise Architecture Planning. Frequent discrepancy between planning and realization of the budget that has been made, resulted in ineffective planning, is one of the reason for doing this research. The design using EAP aims to keep development aligned and in line with the strategic direction of the organization. In the practice, EAP is carried out in several stages of the planning initiation, identification and definition of business functions, proceeded with architectural design and EA implementation plan that has been built. In addition to the design of the Enterprise Architecture, this research carried out the implementation, and was tested by several methods of black box and white box. Black box testing method is used to test the fundamental aspects of the software, tested by two kinds of testing, first is using User Acceptance Testing and the second is using software functionality testing. White box testing method is used to test the effectiveness of the code in the software, tested using unit testing. Tests conducted using white box and black box on the integrated planning information system, is declared successful. Success in the software testing can not be ascertained if the software built has not shown any distinction from prior circumstance to the development of this integrated planning information system. For ensuring the success of this system implementation, the authors test consistency between the planning of data and the realization of prior-use of the information system, until after-use information system. This consistency test is done by reducing the time data of the planning and realization time. From the tabulated data, the planning information system that has been built reduces the difference between the planning time and the realization time, in which indicates that the planning information system can motivate the planner unit in realizing the budget that has been designed. It also proves that the value chain of the information planning system has brought implications for budget realization.

  4. Butanol / Honda CRADA Report

    DTIC Science & Technology

    2015-02-01

    study developed a test plan to test BU16 in CG boats, assessing boat performance, and the modifications required to use the fuel. The third study (and...current project) executed this test plan to quantify implementation issues, benefits and impacts of using the alternative fuel in CG boats under...4  2.2  Project 2: Test Plan Development

  5. CPAS Preflight Drop Test Analysis Process

    NASA Technical Reports Server (NTRS)

    Englert, Megan E.; Bledsoe, Kristin J.; Romero, Leah M.

    2015-01-01

    Throughout the Capsule Parachute Assembly System (CPAS) drop test program, the CPAS Analysis Team has developed a simulation and analysis process to support drop test planning and execution. This process includes multiple phases focused on developing test simulations and communicating results to all groups involved in the drop test. CPAS Engineering Development Unit (EDU) series drop test planning begins with the development of a basic operational concept for each test. Trajectory simulation tools include the Flight Analysis and Simulation Tool (FAST) for single bodies, and the Automatic Dynamic Analysis of Mechanical Systems (ADAMS) simulation for the mated vehicle. Results are communicated to the team at the Test Configuration Review (TCR) and Test Readiness Review (TRR), as well as at Analysis Integrated Product Team (IPT) meetings in earlier and intermediate phases of the pre-test planning. The ability to plan and communicate efficiently with rapidly changing objectives and tight schedule constraints is a necessity for safe and successful drop tests.

  6. An Analysis and Plan of Test Development for the Law Enforcement Basic Training Course.

    ERIC Educational Resources Information Center

    Vineberg, Robert; Taylor, John E.

    A test development plan is described to evaluate police enrolled in the law enforcement basic training course developed by California's Commission on Peace Officer Standards and Training (POST). Some general test methodologies are discussed: performance tests, knowledge tests, and situational tests, including role playing simulations and…

  7. Single Event Effect (SEE) Test Planning 101

    NASA Technical Reports Server (NTRS)

    LaBel, Kenneth A.; Pellish, Jonathan; Berg, Melanie D.

    2011-01-01

    This is a course on SEE Test Plan development. It is an introductory discussion of the items that go into planning an SEE test that should complement the SEE test methodology used. Material will only cover heavy ion SEE testing and not proton, LASER, or other though many of the discussed items may be applicable. While standards and guidelines for how-to perform single event effects (SEE) testing have existed almost since the first cyclotron testing, guidance on the development of SEE test plans has not been as easy to find. In this section of the short course, we attempt to rectify this lack. We consider the approach outlined here as a "living" document: mission specific constraints and new technology related issues always need to be taken into account. We note that we will use the term "test planning" in the context of those items being included in a test plan.

  8. Moving granular-bed filter development program, Option III: Development of moving granular-bed filter technology for multi-contaminant control. Task 14: Test plan; Topical report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Haas, J.C.; Olivo, C.A.; Wilson, K.B.

    1994-04-01

    An experimental test plan has been prepared for DOE/METC review and approval to develop a filter media suitable for multi-contaminant control in granular-bed filter (GBF) applications. The plan includes identification, development, and demonstration of methods for enhanced media morphology, chemical reactivity, and mechanical strength. The test plan includes media preparation methods, physical and chemical characterization methods for fresh and reacted media, media evaluation criteria, details of test and analytical equipment, and test matrix of the proposed media testing. A filter media composed of agglomerated limestone and clay was determined to be the best candidate for multi-contaminate control in GBF operation.more » The combined limestone/clay agglomerate has the potential to remove sulfur and alkali species, in addition to particulate, and possibly halogens and trace heavy metals from coal process streams.« less

  9. Launch vehicle test and checkout plan. - Volume 2: Saturn 1B launch vehicle Skylab R (rescue) and AS-208 flow plan and listings

    NASA Technical Reports Server (NTRS)

    1973-01-01

    The launch operations test and checkout plan is a planning document that establishes all launch site checkout activity, including the individual tests and sequence of testing required to fulfill the development center and KSC test and checkout requirements. This volume contains the launch vehicle test and checkout plan encompassing S-1B, S-4B, IU stage, and ground support equipment tests. The plan is based upon AS-208 flow utilizing a manned spacecraft, LUT 1, and launch pad 39B facilities.

  10. Future aerospace ground test facility requirements for the Arnold Engineering Development Center

    NASA Technical Reports Server (NTRS)

    Kirchner, Mark E.; Baron, Judson R.; Bogdonoff, Seymour M.; Carter, Donald I.; Couch, Lana M.; Fanning, Arthur E.; Heiser, William H.; Koff, Bernard L.; Melnik, Robert E.; Mercer, Stephen C.

    1992-01-01

    Arnold Engineering Development Center (AEDC) was conceived at the close of World War II, when major new developments in flight technology were presaged by new aerodynamic and propulsion concepts. During the past 40 years, AEDC has played a significant part in the development of many aerospace systems. The original plans were extended through the years by some additional facilities, particularly in the area of propulsion testing. AEDC now has undertaken development of a master plan in an attempt to project requirements and to plan for ground test and computational facilities over the coming 20 to 30 years. This report was prepared in response to an AEDC request that the National Research Council (NRC) assemble a committee to prepare guidance for planning and modernizing AEDC facilities for the development and testing of future classes of aerospace systems as envisaged by the U.S. Air Force.

  11. 49 CFR 665.11 - Testing requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... braking performance, Structural Integrity, Fuel Economy, Noise, and Emissions; (c) If the new bus model... testing facility shall develop a test plan for the testing of vehicles at the facility. The test plan...

  12. Developing and Testing Simulated Occupational Experiences for Distributive Education Students in Rural Communities: Volume III: Training Plans: Final Report.

    ERIC Educational Resources Information Center

    Virginia Polytechnic Inst. and State Univ., Blacksburg.

    Volume 3 of a three volume final report presents prototype job training plans developed as part of a research project which pilot tested a distributive education program for rural schools utilizing a retail store simulation plan. The plans are for 15 entry-level and 15 career-level jobs in seven categories of distributive business (department…

  13. Integrated System Test Approaches for the NASA Ares I Crew Launch Vehicle

    NASA Technical Reports Server (NTRS)

    Cockrell, Charles

    2008-01-01

    NASA is maturing test and evaluation plans leading to flight readiness of the Ares I crew launch vehicle. Key development, qualification, and verification tests are planned . Upper stage engine sea-level and altitude testing. First stage development and qualification motors. Upper stage structural and thermal development and qualification test articles. Main Propulsion Test Article (MPTA). Upper stage green run testing. Integrated Vehicle Ground Vibration Testing (IVGVT). Aerodynamic characterization testing. Test and evaluation supports initial validation flights (Ares I-Y and Orion 1) and design certification.

  14. Biodiesel Test Plan

    DTIC Science & Technology

    2014-07-01

    Biodiesel Test Plan Distribution Statement A: Approved for Public Release; distribution is unlimited. July 2014 Report No. CG-D-07-14...Appendix C) Biodiesel Test Plan ii UNCLAS//Public | CG-926 R&DC | G. W. Johnson, et al. Public | July 2014 N O T I C E This...Development Center 1 Chelsea Street New London, CT 06320 Biodiesel Test Plan iii UNCLAS//Public | CG-926 R&DC | G. W. Johnson, et al

  15. Audio Development Laboratory (ADL) User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    Romero, Andy

    2012-01-01

    Test process, milestones and inputs are unknowns to first-time users of the ADL. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  16. Research and development plan for the Slagging Pyrolysis Incinerator. [For TRU waste

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hedahl, T.G.; McCormack, M.D.

    1979-01-01

    Objective is to develop an incinerator for processing disposed transuranium waste. This R and D plan describes the R and D efforts required to begin conceptual design of the Slagging Pyrolysis Incinerator (Andco-Torrax). The program includes: incinerator, off-gas treatment, waste handling, instrumentation, immobilization analyses, migration studies, regulations, Belgium R and D test plan, Disney World test plan, and remote operation and maintenance. (DLC)

  17. Development of Phased-Array Ultrasonic Testing Acceptability Criteria : (Phase II)

    DOT National Transportation Integrated Search

    2014-10-01

    The preliminary technical approach and scan plans developed during phase I of this research was implemented on testing four butt-weld specimens. The ray path analysis carried out to develop the scan plans and the preliminary data analysis indicated t...

  18. Contingency plan implementation.

    PubMed

    Neurath, D; Cober, N; Owens, W; Giulivi, A

    2012-06-01

    Although the National blood system in Canada reduces the risk of inventory shortages the possibility of a blood supply shortage still exists. The Ontario Ministry of Health and Long-Term Care developed a provincial plan to manage blood transfusion needs and inventory in the event of a National blood shortage. The Ontario plan was developed to align with the National plan as well as other provincial plans in order to ensure consistency in blood management strategies across the country. The Ontario plan was released in 2008, along with a toolkit to aid hospitals in developing their facility specific plans. In the Champlain region of Ontario, a group of 16 hospitals worked collaboratively to develop a regional blood shortage plan. A provincial blood shortage simulation exercise was held in 2010 to test out these plans. The Director of Transfusion Medicine of the largest facility in the group of 16 hospitals (The Ottawa Hospital) took the lead in the development of the regional blood shortage management plan. Working groups from all 16 sites contributed to the plan development. The proposed plan was presented to the Medical Advisory Committee for approval. The plan consists of activities relating to the severity of the supply shortage as defined by Amber, Red, Recovery and Green phases. The plan includes a communication plan for notifying stakeholders including patients whose treatment may be affected. Inventory management and triage guidelines are provided to reduce the demand for blood and to conserve inventory for those patients whose need is prioritized as highest. The regional blood shortage management plan was tested successfully during the provincial simulation exercise. Where regional hospitals work together to provide healthcare, it is beneficial to develop a standardized plan to provide guidance to hospital personnel in response to a blood supply shortage. A consistent plan will ensure patient care is provided in a consistent manner across a health region. Mock or simulation exercises can aid in testing plans and raising the awareness of stakeholders. Copyright © 2012 Elsevier Ltd. All rights reserved.

  19. The influence of various test plans on mission reliability. [for Shuttle Spacelab payloads

    NASA Technical Reports Server (NTRS)

    Stahle, C. V.; Gongloff, H. R.; Young, J. P.; Keegan, W. B.

    1977-01-01

    Methods have been developed for the evaluation of cost effective vibroacoustic test plans for Shuttle Spacelab payloads. The shock and vibration environments of components have been statistically represented, and statistical decision theory has been used to evaluate the cost effectiveness of five basic test plans with structural test options for two of the plans. Component, subassembly, and payload testing have been performed for each plan along with calculations of optimum test levels and expected costs. The tests have been ranked according to both minimizing expected project costs and vibroacoustic reliability. It was found that optimum costs may vary up to $6 million with the lowest plan eliminating component testing and maintaining flight vibration reliability via subassembly tests at high acoustic levels.

  20. Validating the Electric Maze Task as a Measure of Planning

    ERIC Educational Resources Information Center

    Sheppard, Kelly W.; Cheatham, Carol L.

    2017-01-01

    The Electric Maze Task (EMT) is a novel planning task designed to allow flexible testing of planning abilities across a broad age range and to incorporate manipulations to test underlying planning abilities, such as working-memory and inhibitory control skills. The EMT was tested in a group of 63 typically developing 7- to 12-year-olds.…

  1. Synergistic Development, Test, and Qualification Approaches for the Ares I and V Launch Vehicles

    NASA Technical Reports Server (NTRS)

    Cockrell, Charles E.; Taylor, James L.; Patterson, Alan; Stephens, Samuel E.; Tuma, Margaret; Bartolotta, Paul; Huetter, Uwe; Kaderback, Don; Goggin, David

    2009-01-01

    The U.S. National Aeronautics and Space Administration (NASA) initiated plans to develop the Ares I and Ares V launch vehicles in 2005 to meet the mission objectives for future human exploration of space. Ares I is designed to provide the capability to deliver the Orion crew exploration vehicle (CEV) to low-Earth orbit (LEO), either for docking to the International Space Station (ISS) or docking with an Earth departure stage (EDS) and lunar lander for transit to the Moon. Ares V provides the heavy-lift capability to deliver the EDS and lunar lander to orbit. An integrated test plan was developed for Ares I that includes un-crewed flight validation testing and ground testing to qualify structural components and propulsion systems prior to operational deployment. The overall test program also includes a single development test flight conducted prior to the Ares I critical design review (CDR). Since the Ares V concept was formulated to maximize hardware commonality between the Ares V and Ares I launch vehicles, initial test planning for Ares V has considered the extensibility of test approaches and facilities from Ares I. The Ares V test plan was part of a successful mission concept review (MCR) in 2008.

  2. Parametric evaluation of the cost effectiveness of Shuttle payload vibroacoustic test plans

    NASA Technical Reports Server (NTRS)

    Stahle, C. V.; Gongloff, H. R.; Keegan, W. B.; Young, J. P.

    1978-01-01

    Consideration is given to alternate vibroacoustic test plans for sortie and free flyer Shuttle payloads. Statistical decision models for nine test plans provide a viable method of evaluating the cost effectiveness of alternate vibroacoustic test plans and the associated test levels. The methodology is a major step toward the development of a useful tool for the quantitative tailoring of vibroacoustic test programs to sortie and free flyer payloads. A broader application of the methodology is now possible by the use of the OCTAVE computer code.

  3. Using the Integrated Vehicle Health Management Research Test and Integration Plan Wiki to Identify Synergistic Test Opportunities

    NASA Technical Reports Server (NTRS)

    Koelfgen, Syri J.; Faber, James J.

    2010-01-01

    The National Aeronautics and Space Administration (NASA) and the aviation industry have recognized a need for developing a method to identify and combine resources to carry out research and testing more efficiently. The Integrated Vehicle Health Management (IVHM) Research Test and Integration Plan (RTIP) Wiki is a tool that is used to visualize, plan, and accomplish collaborative research and testing. Synergistic test opportunities are developed using the RTIP Wiki, and include potential common resource testing that combines assets and personnel from NASA, industry, academia, and other government agencies. A research scenario is linked to the appropriate IVHM milestones and resources detailed in the wiki, reviewed by the research team members, and integrated into a collaborative test strategy. The scenario is then implemented by creating a test plan when appropriate and the research is performed. The benefits of performing collaborative research and testing are achieving higher Technology Readiness Level (TRL) test opportunities with little or no additional cost, improved quality of research, and increased communication among researchers. In addition to a description of the method of creating these joint research scenarios, examples of the successful development and implementation of cooperative research using the IVHM RTIP Wiki are given.

  4. Crew Autonomous Scheduling Test (CAST)

    NASA Image and Video Library

    2017-07-18

    iss052e016190 (July 18, 2017) --- Astronaut Peggy Whitson is photographed sitting in front of the Cupola windows during the final Crew Autonomous Scheduling Test (CAST) session. The CAST investigation analyzes whether crews can develop plans in a reasonable period of time with appropriate input, whether proximity of planners to the planned operations increases efficiency, and if crew members are more satisfied when given a role in plan development.

  5. Shuttle payload minimum cost vibroacoustic tests

    NASA Technical Reports Server (NTRS)

    Stahle, C. V.; Gongloff, H. R.; Young, J. P.; Keegan, W. B.

    1977-01-01

    This paper is directed toward the development of the methodology needed to evaluate cost effective vibroacoustic test plans for Shuttle Spacelab payloads. Statistical decision theory is used to quantitatively evaluate seven alternate test plans by deriving optimum test levels and the expected cost for each multiple mission payload considered. The results indicate that minimum costs can vary by as much as $6 million for the various test plans. The lowest cost approach eliminates component testing and maintains flight vibration reliability by performing subassembly tests at a relatively high acoustic level. Test plans using system testing or combinations of component and assembly level testing are attractive alternatives. Component testing alone is shown not to be cost effective.

  6. Test Plan of the Anticipatory Wirelss Sensor Network for the Critical Energy Infrastructure

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carlos Rentel

    2006-09-01

    The test plan for the performance of the Anticipatory Wireless Sensor Network (A-WSN) is presented. The results of the test campaigns will be obtained after actual measurements are taken in the field with the Wireless Sensor Network developed by The Innovation Center-Eaton Corp., and the Anticipatory algorithms developed by ORNL.

  7. Visit from JAXA to NASA MSFC: The Engines Element & Ideas for Collaboration

    NASA Technical Reports Server (NTRS)

    Greene, William D.

    2013-01-01

    System Design, Development, and Fabrication: Design, develop, and fabricate or procure MB-60 component hardware compliant with the imposed technical requirements and in sufficient quantities to fulfill the overall MB-60 development effort. System Development, Assembly, and Test: Manage the scope of the development, assembly, and test-related activities for MB-60 development. This scope includes engine-level development planning, engine assembly and disassembly, test planning, engine testing, inspection, anomaly resolution, and development of necessary ground support equipment and special test equipment. System Integration: Provide coordinated integration in the realms of engineering, safety, quality, and manufacturing disciplines across the scope of the MB-60 design and associated products development Safety and Mission Assurance, structural design, fracture control, materials and processes, thermal analysis. Systems Engineering and Analysis: Manage and perform Systems Engineering and Analysis to provide rigor and structure to the overall design and development effort for the MB-60. Milestone reviews, requirements management, system analysis, program management support Program Management: Manage, plan, and coordinate the activities across all portions of the MB-60 work scope by providing direction for program administration, business management, and supplier management.

  8. High Burnup Dry Storage Cask Research and Development Project, Final Test Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2014-02-27

    EPRI is leading a project team to develop and implement the first five years of a Test Plan to collect data from a SNF dry storage system containing high burnup fuel.12 The Test Plan defined in this document outlines the data to be collected, and the storage system design, procedures, and licensing necessary to implement the Test Plan.13 The main goals of the proposed test are to provide confirmatory data14 for models, future SNF dry storage cask design, and to support license renewals and new licenses for ISFSIs. To provide data that is most relevant to high burnup fuel inmore » dry storage, the design of the test storage system must mimic real conditions that high burnup SNF experiences during all stages of dry storage: loading, cask drying, inert gas backfilling, and transfer to the ISFSI for multi-year storage.15 Along with other optional modeling, SETs, and SSTs, the data collected in this Test Plan can be used to evaluate the integrity of dry storage systems and the high burnup fuel contained therein over many decades. It should be noted that the Test Plan described in this document discusses essential activities that go beyond the first five years of Test Plan implementation.16 The first five years of the Test Plan include activities up through loading the cask, initiating the data collection, and beginning the long-term storage period at the ISFSI. The Test Plan encompasses the overall project that includes activities that may not be completed until 15 or more years from now, including continued data collection, shipment of the Research Project Cask to a Fuel Examination Facility, opening the cask at the Fuel Examination Facility, and examining the high burnup fuel after the initial storage period.« less

  9. Avionics test bed development plan

    NASA Technical Reports Server (NTRS)

    Harris, L. H.; Parks, J. M.; Murdock, C. R.

    1981-01-01

    A development plan for a proposed avionics test bed facility for the early investigation and evaluation of new concepts for the control of large space structures, orbiter attached flex body experiments, and orbiter enhancements is presented. A distributed data processing facility that utilizes the current laboratory resources for the test bed development is outlined. Future studies required for implementation, the management system for project control, and the baseline system configuration are defined. A background analysis of the specific hardware system for the preliminary baseline avionics test bed system is included.

  10. Top Down Implementation Plan for system performance test software

    NASA Technical Reports Server (NTRS)

    Jacobson, G. N.; Spinak, A.

    1982-01-01

    The top down implementation plan used for the development of system performance test software during the Mark IV-A era is described. The plan is based upon the identification of the hierarchical relationship of the individual elements of the software design, the development of a sequence of functionally oriented demonstrable steps, the allocation of subroutines to the specific step where they are first required, and objective status reporting. The results are: determination of milestones, improved managerial visibility, better project control, and a successful software development.

  11. Development Instrument’s Learning of Physics Through Scientific Inquiry Model Based Batak Culture to Improve Science Process Skill and Student’s Curiosity

    NASA Astrophysics Data System (ADS)

    Nasution, Derlina; Syahreni Harahap, Putri; Harahap, Marabangun

    2018-03-01

    This research aims to: (1) developed a instrument’s learning (lesson plan, worksheet, student’s book, teacher’s guide book, and instrument test) of physics learning through scientific inquiry learning model based Batak culture to achieve skills improvement process of science students and the students’ curiosity; (2) describe the quality of the result of develop instrument’s learning in high school using scientific inquiry learning model based Batak culture (lesson plan, worksheet, student’s book, teacher’s guide book, and instrument test) to achieve the science process skill improvement of students and the student curiosity. This research is research development. This research developed a instrument’s learning of physics by using a development model that is adapted from the development model Thiagarajan, Semmel, and Semmel. The stages are traversed until retrieved a valid physics instrument’s learning, practical, and effective includes :(1) definition phase, (2) the planning phase, and (3) stages of development. Test performed include expert test/validation testing experts, small groups, and test classes is limited. Test classes are limited to do in SMAN 1 Padang Bolak alternating on a class X MIA. This research resulted in: 1) the learning of physics static fluid material specially for high school grade 10th consisted of (lesson plan, worksheet, student’s book, teacher’s guide book, and instrument test) and quality worthy of use in the learning process; 2) each component of the instrument’s learning meet the criteria have valid learning, practical, and effective way to reach the science process skill improvement and curiosity in students.

  12. Typical and Atypical (Cerebral Palsy) Development of Unimanual and Bimanual Grasp Planning

    ERIC Educational Resources Information Center

    Janssen, Loes; Steenbergen, Bert

    2011-01-01

    In the present study we tested 13 children with cerebral palsy (CP) and 24 typically developing children (7-12 years old) in a unimanual and bimanual motor planning task. We focused on two research questions: (1) How does motor planning develop in children with and without CP? and (2) Is motor planning facilitated when the task is performed with…

  13. IDC Re-Engineering Phase 3 Development Plan.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Harris, James M.; Burns, John F.; Pollock, David L.

    2017-01-01

    Sandia National Laboratories has prepared a project development plan that proposes how the parties interested in the IDC Re-Engineering system will coordinate its development, testing and transition to operations.

  14. Power Extension Package (PEP) system definition extension, orbital service module systems analysis study. Volume 9: PEP design, development and test plans

    NASA Technical Reports Server (NTRS)

    1979-01-01

    A plan for the production of two PEP flight systems is defined. The task's milestones are described. Provisions for the development and assembly of new ground support equipment required for both testing and launch operations are included.

  15. AgRISTARS: Renewable resources inventory. Land information support system implementation plan and schedule. [San Juan National Forest pilot test

    NASA Technical Reports Server (NTRS)

    Yao, S. S. (Principal Investigator)

    1981-01-01

    The planning and scheduling of the use of remote sensing and computer technology to support the land management planning effort at the national forests level are outlined. The task planning and system capability development were reviewed. A user evaluation is presented along with technological transfer methodology. A land management planning pilot test of the San Juan National Forest is discussed.

  16. PLAN-TA9-2443(U), Rev. B Remediated Nitrate Salt (RNS) Surrogate Formulation and Testing Standard Procedure

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brown, Geoffrey Wayne

    2016-03-16

    This document identifies scope and some general procedural steps for performing Remediated Nitrate Salt (RNS) Surrogate Formulation and Testing. This Test Plan describes the requirements, responsibilities, and process for preparing and testing a range of chemical surrogates intended to mimic the energetic response of waste created during processing of legacy nitrate salts. The surrogates developed are expected to bound1 the thermal and mechanical sensitivity of such waste, allowing for the development of process parameters required to minimize the risk to worker and public when processing this waste. Such parameters will be based on the worst-case kinetic parameters as derived frommore » APTAC measurements as well as the development of controls to mitigate sensitivities that may exist due to friction, impact, and spark. This Test Plan will define the scope and technical approach for activities that implement Quality Assurance requirements relevant to formulation and testing.« less

  17. Office of the Secretary of Defense Research, Development Test and Evaluation, Development and Test Evaluation, Defense, Director of Operational Test and Evaluation Defense, FY 1994 Budget Estimates, Justification of Estimates Submitted to Congress April 1993

    DTIC Science & Technology

    1993-04-01

    separation capability. o Demonstrate advanced KKVs in the 6-20 KG weight class. o Test planning for SRAM/LEAP and PATRIOT/LEAP integrated technology...packaging techniques to reduce satellite size, weight , power, and total system costs. Further development of these technologies are absolutely 4...1993 o Developed a master plan with a delivery schedule for each light- weight subassembly in the sensor integration payload. o Finalized a contract for

  18. Test Planning Approach and Lessons

    NASA Technical Reports Server (NTRS)

    Parkinson, Douglas A.; Brown, Kendall K.

    2004-01-01

    As NASA began technology risk reduction activities and planning for the next generation launch vehicle under the Space Launch Initiative (SLI), now the Next Generation Launch Technology (NGLT) Program, a review of past large liquid rocket engine development programs was performed. The intent of the review was to identify any significant lessons from the development testing programs that could be applied to current and future engine development programs. Because the primary prototype engine in design at the time of this study was the Boeing-Rocketdyne RS-84, the study was slightly biased towards LOX/RP-1 liquid propellant engines. However, the significant lessons identified are universal. It is anticipated that these lessons will serve as a reference for test planning in the Engine Systems Group at Marshall Space Flight Center (MSFC). Towards the end of F-1 and J-2 engine development testing, NASA/MSFC asked Rocketdyne to review those test programs. The result was a document titled, Study to Accelerate Development by Test of a Rocket Engine (R-8099). The "intent (of this study) is to apply this thinking and learning to more efficiently develop rocket engines to high reliability with improved cost effectivenes" Additionally, several other engine programs were reviewed - such as SSME, NSTS, STME, MC-1, and RS-83- to support or refute the R-8099. R-8099 revealed two primary lessons for test planning, which were supported by the other engine development programs. First, engine development programs can benefit from arranging the test program for engine system testing as early as feasible. The best test for determining environments is at the system level, the closest to the operational flight environment. Secondly, the component testing, which tends to be elaborate, should instead be geared towards reducing risk to enable system test. Technical risk can be reduced at the component level, but the design can only be truly verified and validated after engine system testing.

  19. Draft Plan to Develop Non-Intrusive Load Monitoring Test Protocols

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mayhorn, Ebony T.; Sullivan, Greg P.; Petersen, Joseph M.

    2015-09-29

    This document presents a Draft Plan proposed to develop a common test protocol that can be used to evaluate the performance requirements of Non-Intrusive Load Monitoring. Development on the test protocol will be focused on providing a consistent method that can be used to quantify and compare the performance characteristics of NILM products. Elements of the protocols include specifications for appliances to be used, metrics, instrumentation, and a procedure to simulate appliance behavior during tests. In addition, three priority use cases for NILM will be identified and their performance requirements will specified.

  20. Anticipatory Action Planning Increases from 3 to 10 Years of Age in Typically Developing Children

    ERIC Educational Resources Information Center

    Jongbloed-Pereboom, Marjolein; Nijhuis-van der Sanden, Maria W. G.; Saraber-Schiphorst, Nicole; Craje, Celine; Steenbergen, Bert

    2013-01-01

    The primary aim of this study was to assess the development of action planning in a group of typically developing children aged 3 to 10 years (N = 351). The second aim was to assess reliability of the action planning task and to relate the results of the action planning task to results of validated upper limb motor performance tests. Participants…

  1. The development of a Flight Test Engineer's Workstation for the Automated Flight Test Management System

    NASA Technical Reports Server (NTRS)

    Tartt, David M.; Hewett, Marle D.; Duke, Eugene L.; Cooper, James A.; Brumbaugh, Randal W.

    1989-01-01

    The Automated Flight Test Management System (ATMS) is being developed as part of the NASA Aircraft Automation Program. This program focuses on the application of interdisciplinary state-of-the-art technology in artificial intelligence, control theory, and systems methodology to problems of operating and flight testing high-performance aircraft. The development of a Flight Test Engineer's Workstation (FTEWS) is presented, with a detailed description of the system, technical details, and future planned developments. The goal of the FTEWS is to provide flight test engineers and project officers with an automated computer environment for planning, scheduling, and performing flight test programs. The FTEWS system is an outgrowth of the development of ATMS and is an implementation of a component of ATMS on SUN workstations.

  2. In-space propellant logistics. Volume 4: Project planning data

    NASA Technical Reports Server (NTRS)

    1972-01-01

    The prephase A conceptual project planning data as it pertains to the development of the selected logistics module configuration transported into earth orbit by the space shuttle orbiter. The data represents the test, implementation, and supporting research and technology requirements for attaining the propellant transfer operational capability for early 1985. The plan is based on a propellant module designed to support the space-based tug with cryogenic oxygen-hydrogen propellants. A logical sequence of activities that is required to define, design, develop, fabricate, test, launch, and flight test the propellant logistics module is described. Included are the facility and ground support equipment requirements. The schedule of activities are based on the evolution and relationship between the R and T, the development issues, and the resultant test program.

  3. Targeting Low Career Confidence Using the Career Planning Confidence Scale

    ERIC Educational Resources Information Center

    McAuliffe, Garrett; Jurgens, Jill C.; Pickering, Worth; Calliotte, James; Macera, Anthony; Zerwas, Steven

    2006-01-01

    The authors describe the development and validation of a test of career planning confidence that makes possible the targeting of specific problem issues in employment counseling. The scale, developed using a rational process and the authors' experience with clients, was tested for criterion-related validity against 2 other measures. The scale…

  4. Halogen occultation experiment intergrated test plan

    NASA Technical Reports Server (NTRS)

    Mauldin, L. E., III; Butterfield, A. J.

    1986-01-01

    The test program plan is presented for the Halogen Occultation Experiment (HALOE) instrument, which is being developed in-house at the Langley Research Center for the Upper Atmosphere Research Satellite (UARS). This comprehensive test program was developed to demonstrate that the HALOE instrument meets its performance requirements and maintains integrity through UARS flight environments. Each component, subsystem, and system level test is described in sufficient detail to allow development of the necessary test setups and test procedures. Additionally, the management system for implementing this test program is given. The HALOE instrument is a gas correlation radiometer that measures vertical distribution of eight upper atmospheric constituents: O3, HC1, HF, NO, CH4, H2O, NO2, and CO2.

  5. Specific test and evaluation plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hays, W.H.

    1998-03-20

    The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AX-B Valve Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system`s performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP). Testing includes Validations and Verifications (e.g., Commercial Grade Item Dedication activities), Factory Acceptance Tests (FATs), installation tests and inspections, Construction Acceptance Tests (CATs), Acceptance Test Procedures (ATPs), Pre-Operational Test Procedures (POTPs), andmore » Operational Test Procedures (OTPs). It should be noted that POTPs are not required for testing of the transfer line addition. The STEP will be utilized in conjunction with the TEP for verification and validation.« less

  6. Turnaround Operations Analysis for OTV. Volume 3: Technology Development Plan

    NASA Technical Reports Server (NTRS)

    1988-01-01

    An integrated technology development plan for the technologies required to process both GBOTVs and SBOTVs are described. The plan includes definition of the tests and experiments to be accomplished on the ground, in a Space Shuttle Sortie Mission, on an Expendable Launch Vehicle, or at the Space Station as a Technology Development Mission (TDM). The plan reflects and accommodates current and projected research and technology programs where appropriate.

  7. Field Test of Route Planning Software for Lunar Polar Missions

    NASA Astrophysics Data System (ADS)

    Horchler, A. D.; Cunningham, C.; Jones, H. L.; Arnett, D.; Fang, E.; Amoroso, E.; Otten, N.; Kitchell, F.; Holst, I.; Rock, G.; Whittaker, W.

    2017-10-01

    A novel field test paradigm has been developed to demonstrate and validate route planning software in the stark low-angled light and sweeping shadows a rover would experience at the poles of the Moon. Software, ConOps, and test results are presented.

  8. Work plan for cone penetrometer comparison testing.

    DOT National Transportation Integrated Search

    2011-01-01

    The work plan and experimental design are developed around aiding engineers and geologists within the : Wisconsin Department of Transportation to understand the mechanisms controlling cone penetration test : results so that they can decide when the t...

  9. Development of Continuing Nursing Education Offerings for the World Wide Web.

    ERIC Educational Resources Information Center

    Billings, Diane M.; Rowles, Connie J.

    2001-01-01

    Describes steps for web-based continuing education courses in terms of planning (strategic plan, website development, resource team, marketing plan), implementing (course design, web-based tools, copyright and intellectual property), and evaluating (pilot test, formative/summative evaluation, continuous quality improvement). (Contains 16…

  10. Antenna Test Facility (ATF): User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    Lin, Greg

    2011-01-01

    Test process, milestones and inputs are unknowns to first-time users of the ATF. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  11. Radiant Heat Test Facility (RHTF): User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    DelPapa, Steven

    2011-01-01

    Test process, milestones and inputs are unknowns to first-time users of the RHTF. The User Test Planning Guide aids in establishing expectations for both NASA and non- NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  12. Electronic Systems Test Laboratory (ESTL) User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    Robinson, Neil

    2011-01-01

    Test process, milestones and inputs are unknowns to first-time users of the ESTL. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  13. Structures Test Laboratory (STL). User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    Zipay, John J.

    2011-01-01

    Test process, milestones and inputs are unknowns to first-time users of the STL. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  14. Financial Preparation for Retirement in Brazil: a Cross-Cultural Test of the Interdisciplinary Financial Planning Model.

    PubMed

    França, Lucia H F; Hershey, Douglas A

    2018-03-01

    In this investigation, we attempt to replicate the Interdisciplinary Financial Planning Model advanced by Hershey et al. (International Journal of Aging and Human Development, 70, 1-38, 2010) using a sample of Brazilian adults. This model, which was originally tested on individuals from The Netherlands and the United States, posits that psychological, social, and economic forces are key determinants of retirement planning practices and perceptions of saving adequacy. Taken together, fifteen hypotheses were subject to evaluation. Participants were 167 Brazilian working adults, 21-69 years of age, who were married or cohabitating at the time of testing. A path analysis model showed substantial support for the theoretical framework, with all variables found to contribute directly or indirectly to the prediction of financial planning and saving adequacy. Furthermore, two new paths were found to emerge in the Brazilian model that were not observed in the original investigation. This cross-national replication of the Interdisciplinary Financial Planning Model extends research on the topic to a developing country in which relatively few empirical studies of retirement planning have been carried out. Other analyses in the article focus on direct comparisons between the Brazilian model and the models developed based on American and Dutch respondents, with an eye toward better understanding how cultural forces shape the retirement planning process. The discussion focuses on how models of financial planning, such as the Hershey et al. (2010) model, can inform the development of savings-oriented education and intervention programs.

  15. Planning for Applications of Communications Satellites in Education.

    ERIC Educational Resources Information Center

    O'Connell, William K.

    This report of a project to develop and test a prototype system for the delivery of continuing education (CE) to two defined target groups of registered dietitians includes user needs, alternative approaches, the operational plan, the management plan, and personnel. Major tasks involved in the project are described: (1) development,…

  16. Field test designs for the evaluation of vessel operators' use of and confidence in various aids to navigation

    DOT National Transportation Integrated Search

    1995-12-01

    Development Center in evaluating current Coast Guard policies and development plans for : Waterways Management, a "Waterways Management Research and Planning" task plan was : established as Task Area A in FY '94. The purpose of this task area is to d...

  17. Kindergarten Stations for Interest and Skill Learning.

    ERIC Educational Resources Information Center

    1972

    An instructional plan for kindergarten involving learning or interest centers is presented. The plan involves the development of stations for individual interest and skill development, including testing of readiness tasks. The teacher must plan the activities for each station. In classsrooms with only one teacher, only one station should be set up…

  18. Energy Systems Test Area (ESTA) Battery Test Operations User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    Salinas, Michael

    2012-01-01

    Test process, milestones and inputs are unknowns to first-time users of the ESTA Battery Test Operations. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  19. Chamber B Thermal/Vacuum Chamber: User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    Montz, Mike E.

    2012-01-01

    Test process, milestones and inputs are unknowns to first-time users of Chamber B. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  20. Advanced Materials Laboratory User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    Orndoff, Evelyne

    2012-01-01

    Test process, milestones and inputs are unknowns to first-time users of the Advanced Materials Laboratory. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  1. Joint ETV/NOWATECH test plan for the Sorbisense GSW40 passive sampler

    EPA Science Inventory

    The joint test plan is the implementation of a test design developed for verification of the performance of an environmental technology following the NOWATECH ETV method. The verification is a joint verification with the US EPA ETV scheme and the Advanced Monitoring Systems Cent...

  2. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zaks, D; Fletcher, R; Salamon, S

    Purpose: To develop an online framework that tracks a patient’s plan from initial simulation to treatment and that helps automate elements of the physics plan checks usually performed in the record and verify (RV) system and treatment planning system. Methods: We have developed PlanTracker, an online plan tracking system that automatically imports new patients tasks and follows it through treatment planning, physics checks, therapy check, and chart rounds. A survey was designed to collect information about the amount of time spent by medical physicists in non-physics related tasks. We then assessed these non-physics tasks for automation. Using these surveys, wemore » directed our PlanTracker software development towards the automation of intra-plan physics review. We then conducted a systematic evaluation of PlanTracker’s accuracy by generating test plans in the RV system software designed to mimic real plans, in order to test its efficacy in catching errors both real and theoretical. Results: PlanTracker has proven to be an effective improvement to the clinical workflow in a radiotherapy clinic. We present data indicating that roughly 1/3 of the physics plan check can be automated, and the workflow optimized, and show the functionality of PlanTracker. When the full system is in clinical use we will present data on improvement of time use in comparison to survey data prior to PlanTracker implementation. Conclusion: We have developed a framework for plan tracking and automatic checks in radiation therapy. We anticipate using PlanTracker as a basis for further development in clinical/research software. We hope that by eliminating the most simple and time consuming checks, medical physicists may be able to spend their time on plan quality and other physics tasks rather than in arithmetic and logic checks. We see this development as part of a broader initiative to advance the clinical/research informatics infrastructure surrounding the radiotherapy clinic. This research project has been financially supported by Varian Medical Systems, Palo Alto, CA, through a Varian MRA.« less

  3. Development and Test Plans for the MSR EEV

    NASA Technical Reports Server (NTRS)

    Dillman, Robert; Laub, Bernard; Kellas, Sotiris; Schoenenberger, Mark

    2005-01-01

    The goal of the proposed Mars Sample Return mission is to bring samples from the surface of Mars back to Earth for thorough examination and analysis. The Earth Entry Vehicle is the passive entry body designed to protect the sample container from entry heating and deceleration loads during descent through the Earth s atmosphere to a recoverable location on the surface. This paper summarizes the entry vehicle design and outlines the subsystem development and testing currently planned in preparation for an entry vehicle flight test in 2010 and mission launch in 2013. Planned efforts are discussed for the areas of the thermal protection system, vehicle trajectory, aerodynamics and aerothermodynamics, impact energy absorption, structure and mechanisms, and the entry vehicle flight test.

  4. Specialized Environmental Chamber Test Complex: User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    Montz, Michael E.

    2011-01-01

    Test process, milestones and inputs are unknowns to first-time users of the Specialized Environmental Test Complex. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  5. Electromagnetic Interference/Compatibility (EMI/EMC) Control Test and Measurement Facility: User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    Scully, Robert C.

    2011-01-01

    Test process, milestones and inputs are unknowns to first-time users of the EMI/EMC Test Facility. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  6. Vibroacoustic test plan evaluation: Parameter variation study

    NASA Technical Reports Server (NTRS)

    Stahle, C. V.; Gongloef, H. R.

    1976-01-01

    Statistical decision models are shown to provide a viable method of evaluating the cost effectiveness of alternate vibroacoustic test plans and the associated test levels. The methodology developed provides a major step toward the development of a realistic tool to quantitatively tailor test programs to specific payloads. Testing is considered at the no test, component, subassembly, or system level of assembly. Component redundancy and partial loss of flight data are considered. Most and probabilistic costs are considered, and incipient failures resulting from ground tests are treated. Optimums defining both component and assembly test levels are indicated for the modified test plans considered. modeling simplifications must be considered in interpreting the results relative to a particular payload. New parameters introduced were a no test option, flight by flight failure probabilities, and a cost to design components for higher vibration requirements. Parameters varied were the shuttle payload bay internal acoustic environment, the STS launch cost, the component retest/repair cost, and the amount of redundancy in the housekeeping section of the payload reliability model.

  7. The Development and Structure of Professional Examinations Planned for National Use.

    ERIC Educational Resources Information Center

    Hecht, James T.

    The process typically employed by testing services in developing professional tests for national use is described: (1) determination of professional standards; (2) development of test specifications; (3) test construction; (4) test registration and administration; and (5) scoring, analysis, and reporting. To determine professional standards, input…

  8. Space tug point design study. Volume 4: Program requirements

    NASA Technical Reports Server (NTRS)

    1973-01-01

    A study was conducted to determine the configuration of a space tug and to predict the performance parameters. The program plans and planning data generated in support of the tug development program are presented. The preliminary plans and supporting planning data emphasize the following requirements: (1) maintenance and refurbishment, (2) technology development, (3) production, (4) test facilities, (5) quality control, and (6) scheduling.

  9. Pilot-scale treatability test plan for the 200-BP-5 operable unit

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This document presents the treatability test plan for pilot-scale pump and treat testing at the 200-BP-5 Operable Unit. This treatability test plan has been prepared in response to an agreement between the U.S. Department of Energy (DOE), the U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology), as documented in Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1989a) Change Control Form M-13-93-03 (Ecology et al. 1994) and a recent 200 NPL Agreement Change Control Form (Appendix A). The agreement also requires that, following completion of the activities described in thismore » test plan, a 200-BP-5 Operable Unit Interim Remedial Measure (IRM) Proposed Plan be developed for use in preparing an Interim Action Record of Decision (ROD). The IRM Proposed Plan will be supported by the results of this treatability test plan, as well as by other 200-BP-5 Operable Unit activities (e.g., development of a qualitative risk assessment). Once issued, the Interim Action ROD will specify the interim action(s) for groundwater contamination at the 200-BP-5 Operable Unit. The treatability test approach is to conduct a pilot-scale pump and treat test for each of the two contaminant plumes associated with the 200-BP-5 Operable Unit. Primary contaminants of concern are {sup 99}Tc and {sup 60}Co for underwater affected by past discharges to the 216-BY Cribs, and {sup 90}Sr, {sup 239/240}Pu, and Cs for groundwater affected by past discharges to the 216-B-5 Reverse Well. The purpose of the pilot-scale treatability testing presented in this testplan is to provide the data basis for preparing an IRM Proposed Plan. To achieve this objective, treatability testing must: Assess the performance of groundwater pumping with respect to the ability to extract a significant amount of the primary contaminant mass present in the two contaminant plumes.« less

  10. Vibration and Acoustic Test Facility (VATF): User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    Fantasia, Peter M.

    2011-01-01

    Test process, milestones and inputs are unknowns to first-time users of the VATF. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  11. Six-Degree-of-Freedom Dynamic Test System (SDTS) User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    Stokes, LeBarian

    2012-01-01

    Test process, milestones and inputs are unknowns to first-time users of the SDTS. The User Test Planning Guide aids in establishing expectations for both NASA and non- NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  12. Training and Learning as Drivers of US Microenterprise Business Plan Quality

    ERIC Educational Resources Information Center

    Cook, Ronald G.; Belliveau, Paul; Sandberg, Mark E.

    2004-01-01

    This study examined the output quality of a US microenterprise training program created to help entrepreneurs develop business plans for their ventures. The program concludes with the entrepreneurs' plans being scored by a panel of experts. Hypotheses were developed and tested to determine the importance of feedback, key components of business…

  13. 41 CFR 102-71.20 - What definitions apply to GSA's real property policies?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... planning, engineering, architectural work, and other similar actions. Carpool means a group of two or more... tested in accordance with the American Society for Testing and Materials, Test E 84, Surface Burning... space in a facility under GSA's custody and control. Occupant Emergency Plan means procedures developed...

  14. 41 CFR 102-71.20 - What definitions apply to GSA's real property policies?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... planning, engineering, architectural work, and other similar actions. Carpool means a group of two or more... tested in accordance with the American Society for Testing and Materials, Test E 84, Surface Burning... space in a facility under GSA's custody and control. Occupant Emergency Plan means procedures developed...

  15. The Challenge of Grounding Planning in Simulation with an Interactive Model Development Environment

    NASA Technical Reports Server (NTRS)

    Clement, Bradley J.; Frank, Jeremy D.; Chachere, John M.; Smith, Tristan B.; Swanson, Keith J.

    2011-01-01

    A principal obstacle to fielding automated planning systems is the difficulty of modeling. Physical systems are modeled conventionally based on specification documents and the modeler's understanding of the system. Thus, the model is developed in a way that is disconnected from the system's actual behavior and is vulnerable to manual error. Another obstacle to fielding planners is testing and validation. For a space mission, generated plans must be validated often by translating them into command sequences that are run in a simulation testbed. Testing in this way is complex and onerous because of the large number of possible plans and states of the spacecraft. Though, if used as a source of domain knowledge, the simulator can ease validation. This paper poses a challenge: to ground planning models in the system physics represented by simulation. A proposed, interactive model development environment illustrates the integration of planning and simulation to meet the challenge. This integration reveals research paths for automated model construction and validation.

  16. 7 CFR 1948.57 - Eligible activities.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ...) Education plans; and (vi) Subdivision plans. (3) Payment of salaries of professional, technical, and... to undertake tests, make appraisals, and arrange for engineering/architectural services necessary for...) Necessary engineering reports in connection with site development; (7) Payment of costs to undertake tests...

  17. Minnesota urban partnership agreement national evaluation : surveys, interviews, and focus groups test plan.

    DOT National Transportation Integrated Search

    2009-11-17

    This report presents the test plan for developing, conducting, and analyzing surveys, interviews, and focus groups for evaluating the Minnesota Urban Partnership Agreement (UPA) under the United States Department of Transportation (U.S. DOT) UPA Prog...

  18. Energy Systems Test Area (ESTA) Electrical Power Systems Test Operations: User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    Salinas, Michael J.

    2012-01-01

    Test process, milestones and inputs are unknowns to first-time users of the ESTA Electrical Power Systems Test Laboratory. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  19. Atmospheric Reentry Materials and Structures Evaluation Facility (ARMSEF). User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    2011-01-01

    Test process, milestones and inputs are unknowns to first-time users of the ARMSEF. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  20. Phase 2 STS new user development program. Volume 1: Executive summary

    NASA Technical Reports Server (NTRS)

    Mcdowell, J. R.

    1976-01-01

    A methodology for developing new users for STS other than NASA and DoD, thereby maximizing the use of the STS system was developed. The approach to user development, reflected in the implementation plan, and attendant informational material to be used were evaluated by conducting a series of test cases with selected user organizations. These test case organizations were, in effect, used as consultants to evaluate the effectiveness, the needs, the completeness, and the adequacy of the user development approach and informational material. The selection of the test cases provided a variety of potential STS users covering industry, other government agencies, and the educational sector. The test cases covered various use areas and provided a mix of user organization types. A summary of the actual test cases conducted is given. The conduct of the test cases verified the general approach of the implementation plan, the validity of the user development strategy prepared for each test case organization and the effectiveness of the STS basic and user customized informational material.

  1. Helicopter precision approach capability using the Global Positioning System

    NASA Technical Reports Server (NTRS)

    Kaufmann, David N.

    1992-01-01

    The period between 1 July and 31 December, 1992, was spent developing a research plan as well as a navigation system document and flight test plan to investigate helicopter precision approach capability using the Global Positioning System (GPS). In addition, all hardware and software required for the research was acquired, developed, installed, and verified on both the test aircraft and the ground-based reference station.

  2. The effectiveness of CCDSR learning model to improve skills of creating lesson plan and worksheet science process skill (SPS) for pre-service physics teacher

    NASA Astrophysics Data System (ADS)

    Limatahu, I.; Sutoyo, S.; Wasis; Prahani, B. K.

    2018-03-01

    In the previous research, CCDSR (Condition, Construction, Development, Simulation, and Reflection) learning model has been developed to improve science process skills for pre-service physics teacher. This research is aimed to analyze the effectiveness of CCDSR learning model towards the improvement skills of creating lesson plan and worksheet of Science Process Skill (SPS) for pre-service physics teacher in academic year 2016/2017. This research used one group pre-test and post-test design on 12 pre-service physics teacher at Physics Education, University of Khairun. Data collection was conducted through test and observation. Creating lesson plan and worksheet SPS skills of pre-service physics teacher measurement were conducted through Science Process Skill Evaluation Sheet (SPSES). The data analysis technique was done by Wilcoxon t-test and n-gain. The CCDSR learning model consists of 5 phases, including (1) Condition, (2) Construction, (3) Development, (4) Simulation, and (5) Reflection. The results showed that there was a significant increase in creating lesson plan and worksheet SPS skills of pre-service physics teacher at α = 5% and n-gain average of moderate category. Thus, the CCDSR learning model is effective for improving skills of creating lesson plan and worksheet SPS for pre-service physics teacher.

  3. Development of a preprototype times wastewater recovery subsystem: Appendices

    NASA Technical Reports Server (NTRS)

    Roebelen, G. J., Jr.; Dehner, G. F.

    1984-01-01

    This Master Test Plan outlines the test program to be performed by Hamilton Standard during the Urine Water Recovery Subsystem Program. Testing is divided into three phases: (1) design support testing; development component testing; and acceptance testing. The completion of this test program verifies the subsystem operation.

  4. Definition study of a Variable Cycle Experimental Engine (VCEE) and associated test program and test plan

    NASA Technical Reports Server (NTRS)

    Allan, R. D.

    1978-01-01

    The Definition Study of a Variable Cycle Experimental Engine (VCEE) and Associated Test Program and Test Plan, was initiated to identify the most cost effective program for a follow-on to the AST Test Bed Program. The VCEE Study defined various subscale VCE's based on different available core engine components, and a full scale VCEE utilizing current technology. The cycles were selected, preliminary design accomplished and program plans and engineering costs developed for several program options. In addition to the VCEE program plans and options, a limited effort was applied to identifying programs that could logically be accomplished on the AST Test Bed Program VCE to extend the usefulness of this test hardware. Component programs were provided that could be accomplished prior to the start of a VCEE program.

  5. Control of Technology Transfer at JPL

    NASA Technical Reports Server (NTRS)

    Oliver, Ronald

    2006-01-01

    Controlled Technology: 1) Design: preliminary or critical design data, schematics, technical flow charts, SNV code/diagnostics, logic flow diagrams, wirelist, ICDs, detailed specifications or requirements. 2) Development: constraints, computations, configurations, technical analyses, acceptance criteria, anomaly resolution, detailed test plans, detailed technical proposals. 3) Production: process or how-to: assemble, operated, repair, maintain, modify. 4) Manufacturing: technical instructions, specific parts, specific materials, specific qualities, specific processes, specific flow. 5) Operations: how-to operate, contingency or standard operating plans, Ops handbooks. 6) Repair: repair instructions, troubleshooting schemes, detailed schematics. 7) Test: specific procedures, data, analysis, detailed test plan and retest plans, detailed anomaly resolutions, detailed failure causes and corrective actions, troubleshooting, trended test data, flight readiness data. 8) Maintenance: maintenance schedules and plans, methods for regular upkeep, overhaul instructions. 9) Modification: modification instructions, upgrades kit parts, including software

  6. 30 CFR 282.23 - Testing Plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Resources BUREAU OF OCEAN ENERGY MANAGEMENT, REGULATION, AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR... lessee needs more information to develop a detailed Mining Plan than is obtainable under an approved... techniques or technology or mining equipment, or to determine environmental effects by a pilot test mining...

  7. Career Planning Modules for the Officer Career Information and Planning System.

    ERIC Educational Resources Information Center

    Phillips, Susan D.; And Others

    This discussion of the modules in an experimental computer-aided system for officer career information and planning system (OCIPS) includes the reasons for its development, a description of the seven modules, and the findings of a preliminary test of four of the modules for feasibility and credibility. Initially developed in response to a need…

  8. Informap... a computerized information system for fire planning and fire control

    Treesearch

    Theodore G. Storey; Ross D. Carder; Ernest T. Tolin

    1969-01-01

    INFORMAP (Information Necessary for Optimum Resource Management and Protection) is a computerized system under development for storing, manipulating, retrieving, and displaying data for fire planning and fire control. A prototype for planning applications has been developed and tested. It is programed in Fortran IV for the IBM 7040 computer, and displays information in...

  9. Systems test facilities existing capabilities compilation

    NASA Technical Reports Server (NTRS)

    Weaver, R.

    1981-01-01

    Systems test facilities (STFS) to test total photovoltaic systems and their interfaces are described. The systems development (SD) plan is compilation of existing and planned STFs, as well as subsystem and key component testing facilities. It is recommended that the existing capabilities compilation is annually updated to provide and assessment of the STF activity and to disseminate STF capabilities, status and availability to the photovoltaics program.

  10. It's Time to Develop a New "Draft Test Protocol" for a Mars Sample Return Mission (or Two…).

    PubMed

    Rummel, John D; Kminek, Gerhard

    2018-04-01

    The last time NASA envisioned a sample return mission from Mars, the development of a protocol to support the analysis of the samples in a containment facility resulted in a "Draft Test Protocol" that outlined required preparations "for the safe receiving, handling, testing, distributing, and archiving of martian materials here on Earth" (Rummel et al., 2002 ). This document comprised a specific protocol to be used to conduct a biohazard test for a returned martian sample, following the recommendations of the Space Studies Board of the US National Academy of Sciences. Given the planned launch of a sample-collecting and sample-caching rover (Mars 2020) in 2 years' time, and with a sample return planned for the end of the next decade, it is time to revisit the Draft Test Protocol to develop a sample analysis and biohazard test plan to meet the needs of these future missions. Key Words: Biohazard detection-Mars sample analysis-Sample receiving facility-Protocol-New analytical techniques-Robotic sample handling. Astrobiology 18, 377-380.

  11. Problems and Procedures in Planning a Situation Based Video Test on Teaching.

    ERIC Educational Resources Information Center

    Masonis, Edward J.

    This paper briefly outlines some problems one must solve when developing a video-based test to evaluate what a teacher knows about learning and instruction. Consideration is given to the effect the use of videotapes of actual classroom behavior have on test planning. Two methods of incorporating such situational material into the test…

  12. 77 FR 47077 - Statement of Organization, Functions, and Delegations of Authority; Office of Planning, Research...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-07

    ...; surveys, research and evaluation methodologies; demonstration testing and model development; synthesis and..., policy and program analysis; surveys, research and evaluation methodologies; demonstration testing and... Organization, Functions, and Delegations of Authority; Office of Planning, Research and Evaluation AGENCY...

  13. CONSUMER ASSESSMENT OF HEALTH PLANS SURVEY (CAHPS)

    EPA Science Inventory

    This 5-year project has been used for consumers to identify the best health care plans and services for their needs. The goals of the Consumer Assessment of Health Plans (CAHPS?) are to (1) develop and test questionnaires that assess health plans and services, (2) produce easily ...

  14. 30 CFR 282.21 - Plans, general.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Plans, general. 282.21 Section 282.21 Mineral... § 282.21 Plans, general. (a) No exploration, testing, development, or production activities, except preliminary activities, shall be commenced or conducted on any lease except in accordance with a plan...

  15. Radon control activities for lung cancer prevention in national comprehensive cancer control program plans, 2005-2011.

    PubMed

    Neri, Antonio; Stewart, Sherri L; Angell, William

    2013-08-08

    Radon is the second leading cause of lung cancer among smokers and the leading cause among nonsmokers. The US Environmental Protection Agency recommends that every home be tested for radon. Comprehensive Cancer Control (CCC) programs develop cancer coalitions that coordinate funding and resources to focus on cancer activities that are recorded in cancer plans. Radon tests, remediation, and radon mitigation techniques are relatively inexpensive, but it is unclear whether coalitions recognize radon as an important carcinogen. We reviewed 65 cancer plans created from 2005 through 2011 for the terms "radon," "radiation," or "lung." Plan activities were categorized as radon awareness, home testing, remediation, supporting radon policy activities, or policy evaluation. We also reviewed each CCC program's most recent progress report. Cancer plan content was reviewed to assess alignment with existing radon-specific policies in each state. Twenty-seven of the plans reviewed (42%) had radon-specific terminology. Improving awareness of radon was included in all 27 plans; also included were home testing (n=21), remediation (n=11), support radon policy activities (n=13), and policy evaluation (n=1). Three plans noted current engagement in radon activities. Thirty states had radon-specific laws; most (n=21) were related to radon professional licensure. Eleven states had cancer plan activities that aligned with existing state radon laws. Although several states have radon-specific policies, approximately half of cancer coalitions may not be aware of radon as a public health issue. CCC-developed cancer coalitions and plans should prioritize tobacco control to address lung cancer but should consider addressing radon through partnership with existing radon control programs.

  16. WEC-SIM Validation Testing Plan FY14 Q4.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ruehl, Kelley Michelle

    2016-02-01

    The WEC-Sim project is currently on track, having met both the SNL and NREL FY14 Milestones, as shown in Table 1 and Table 2. This is also reflected in the Gantt chart uploaded to the WEC-Sim SharePoint site in the FY14 Q4 Deliverables folder. The work completed in FY14 includes code verification through code-to-code comparison (FY14 Q1 and Q2), preliminary code validation through comparison to experimental data (FY14 Q2 and Q3), presentation and publication of the WEC-Sim project at OMAE 2014 [1], [2], [3] and GMREC/METS 2014 [4] (FY14 Q3), WEC-Sim code development and public open-source release (FY14 Q3), andmore » development of a preliminary WEC-Sim validation test plan (FY14 Q4). This report presents the preliminary Validation Testing Plan developed in FY14 Q4. The validation test effort started in FY14 Q4 and will go on through FY15. Thus far the team has developed a device selection method, selected a device, and placed a contract with the testing facility, established several collaborations including industry contacts, and have working ideas on the testing details such as scaling, device design, and test conditions.« less

  17. Methodology, status and plans for development and assessment of Cathare code

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bestion, D.; Barre, F.; Faydide, B.

    1997-07-01

    This paper presents the methodology, status and plans for the development, assessment and uncertainty evaluation of the Cathare code. Cathare is a thermalhydraulic code developed by CEA (DRN), IPSN, EDF and FRAMATOME for PWR safety analysis. First, the status of the code development and assessment is presented. The general strategy used for the development and the assessment of the code is presented. Analytical experiments with separate effect tests, and component tests are used for the development and the validation of closure laws. Successive Revisions of constitutive laws are implemented in successive Versions of the code and assessed. System tests ormore » integral tests are used to validate the general consistency of the Revision. Each delivery of a code Version + Revision is fully assessed and documented. A methodology is being developed to determine the uncertainty on all constitutive laws of the code using calculations of many analytical tests and applying the Discrete Adjoint Sensitivity Method (DASM). At last, the plans for the future developments of the code are presented. They concern the optimization of the code performance through parallel computing - the code will be used for real time full scope plant simulators - the coupling with many other codes (neutronic codes, severe accident codes), the application of the code for containment thermalhydraulics. Also, physical improvements are required in the field of low pressure transients and in the modeling for the 3-D model.« less

  18. Ares I Integrated Test Approach

    NASA Technical Reports Server (NTRS)

    Taylor, Jim

    2008-01-01

    This slide presentation reviews the testing approach that NASA is developing for the Ares I launch vehicle. NASA is planning a complete series of development, qualification and verification tests. These include: (1) Upper stage engine sea-level and altitude testing (2) First stage development and qualification motors (3) Upper stage structural and thermal development and qualification test articles (4) Main Propulsion Test Article (MPTA) (5) Upper stage green run testing (6) Integrated Vehicle Ground Vibration Testing (IVGVT) and (7) Aerodynamic characterization testing.

  19. Pretest Predictions for Phase II Ventilation Tests

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Yiming Sun

    The objective of this calculation is to predict the temperatures of the ventilating air, waste package surface, and concrete pipe walls that will be developed during the Phase II ventilation tests involving various test conditions. The results will be used as inputs to validating numerical approach for modeling continuous ventilation, and be used to support the repository subsurface design. The scope of the calculation is to identify the physical mechanisms and parameters related to thermal response in the Phase II ventilation tests, and describe numerical methods that are used to calculate the effects of continuous ventilation. The calculation is limitedmore » to thermal effect only. This engineering work activity is conducted in accordance with the ''Technical Work Plan for: Subsurface Performance Testing for License Application (LA) for Fiscal Year 2001'' (CRWMS M&O 2000d). This technical work plan (TWP) includes an AP-2.21Q, ''Quality Determinations and Planning for Scientific, Engineering, and Regulatory Compliance Activities'', activity evaluation (CRWMS M&O 2000d, Addendum A) that has determined this activity is subject to the YMP quality assurance (QA) program. The calculation is developed in accordance with the AP-3.12Q procedure, ''Calculations''. Additional background information regarding this activity is contained in the ''Development Plan for Ventilation Pretest Predictive Calculation'' (DP) (CRWMS M&O 2000a).« less

  20. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rutqvist, Jonny; Blanco Martin, Laura; Mukhopadhyay, Sumit

    The modeling efforts in support of the field test planning conducted at LBNL leverage on recent developments of tools for modeling coupled thermal-hydrological-mechanical-chemical (THMC) processes in salt and their effect on brine migration at high temperatures. This work includes development related to, and implementation of, essential capabilities, as well as testing the model against relevant information and published experimental data related to the fate and transport of water. These are modeling capabilities that will be suitable for assisting in the design of field experiment, especially related to multiphase flow processes coupled with mechanical deformations, at high temperature. In this report,more » we first examine previous generic repository modeling results, focusing on the first 20 years to investigate the expected evolution of the different processes that could be monitored in a full-scale heater experiment, and then present new results from ongoing modeling of the Thermal Simulation for Drift Emplacement (TSDE) experiment, a heater experiment on the in-drift emplacement concept at the Asse Mine, Germany, and provide an update on the ongoing model developments for modeling brine migration. LBNL also supported field test planning activities via contributions to and technical review of framework documents and test plans, as well as participation in workshops associated with field test planning.« less

  1. 30 CFR 285.640 - What is a General Activities Plan (GAP)?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... RENEWABLE ENERGY ALTERNATE USES OF EXISTING FACILITIES ON THE OUTER CONTINENTAL SHELF Plans and Information... conceptual decommissioning plans for all planned facilities, including testing of technology devices and... easements for the assessment and development of your limited lease or grant. (b) You must receive MMS...

  2. Electronic intermodal supply chain manifest ITS field operational test evaluation plan

    DOT National Transportation Integrated Search

    2000-09-25

    This document is an evaluation plan for a field operational test (FOT) that is based at O'Hare International Airport in Chicago and which will focus on the air cargo component of intermodal freight movements. The objectives of the FOT are to develop,...

  3. Definition study for variable cycle engine testbed engine and associated test program

    NASA Technical Reports Server (NTRS)

    Vdoviak, J. W.

    1978-01-01

    The product/study double bypass variable cycle engine (VCE) was updated to incorporate recent improvements. The effect of these improvements on mission range and noise levels was determined. This engine design was then compared with current existing high-technology core engines in order to define a subscale testbed configuration that simulated many of the critical technology features of the product/study VCE. Detailed preliminary program plans were then developed for the design, fabrication, and static test of the selected testbed engine configuration. These plans included estimated costs and schedules for the detail design, fabrication and test of the testbed engine and the definition of a test program, test plan, schedule, instrumentation, and test stand requirements.

  4. Development Overview of the Revised NASA Ultra Long Duration Balloon

    NASA Technical Reports Server (NTRS)

    Cathey, H. M.; Gregory, D; Young, L.; Pierce, D.

    2006-01-01

    The development of the National Aeronautics and Space Administration s (NASA) Ultra Long Duration Balloon (ULDB) has made significant strides in addressing the deployment issues experienced in the scaling up of the balloon structure. This paper concentrates on the super-pressure balloon developments that have been, and are currently being planned by the NASA Balloon Program Office at Goddard Space Flight Center s Wallops Flight Facility. The goal of the NASA ULDB development project is to attempt to extend the potential flight durations for large scientific balloon payloads. A summary of the February 2005 test flight from Ft. Sumner, New Mexico will be presented. This test flight spurred a number of investigations and advancements for this project. The development path has pursued some new approaches in the design, analysis, and testing of the balloons. New issues have been ideEti6ed throu& both analysis md testing. These have been addressed in the design stage before the next balloon construction was begun. This paper will give an overview of the recent history for this effort and the development approach pursued for ULDB. A description of the balloon design, including the modifications made as a result of the lessons learned, will be presented. Areas to be presented include the design approach, deployment issues that have been encountered and the proposed solutions, ground testing, photogrammetry, and an analysis overview. Test flight planning and considerations will be presented including test flight safety. An extended duration test flight of the National Aeronautics and Space Administration s Ultra Long Duration Balloon is planned for the May/June 2006 time frame. This flight is expected to fly from Sweden to either Canada or Alaska. Preliminary results of this flight will be presented as available. Future plans for both ground testing and additional test flights will also be presented. Goals of the future test flights, which are staged in increments of increasing suspended load and altitude, will be presented. This will include the projected balloon volumes, payload capabilities, test flight locations, and proposed flight schedule.

  5. Planning fuel-conservative descents with or without time constraints using a small programmable calculator: Algorithm development and flight test results

    NASA Technical Reports Server (NTRS)

    Knox, C. E.

    1983-01-01

    A simplified flight-management descent algorithm, programmed on a small programmable calculator, was developed and flight tested. It was designed to aid the pilot in planning and executing a fuel-conservative descent to arrive at a metering fix at a time designated by the air traffic control system. The algorithm may also be used for planning fuel-conservative descents when time is not a consideration. The descent path was calculated for a constant Mach/airspeed schedule from linear approximations of airplane performance with considerations given for gross weight, wind, and nonstandard temperature effects. The flight-management descent algorithm is described. The results of flight tests flown with a T-39A (Sabreliner) airplane are presented.

  6. Developing and testing new smoking measures for the Health Plan Employer Data and Information Set.

    PubMed

    Pbert, Lori; Vuckovic, Nancy; Ockene, Judith K; Hollis, Jack F; Riedlinger, Karen

    2003-04-01

    To develop and test items for the Health Plan Employee Data and Information Set (HEDIS) that assess delivery of the full range of provider-delivered tobacco interventions. The authors identified potential items via literature review; items were reviewed by national experts. Face validity of candidate items was tested in focus groups. The final survey was sent to a random sample of 1711 adult primary care patients; the re-test survey was sent to self-identified smokers. The process identified reliable items to capture provider assessment of motivation and provision of assistance and follow-up. One can reliably assess patient self-report of provider delivery of the full range of brief tobacco interventions. Such assessment and feedback to health plans and providers may increase use of evidence-based brief interventions.

  7. Desire for predictive testing for Alzheimer's disease and impact on advance care planning: a cross-sectional study.

    PubMed

    Sheffrin, Meera; Stijacic Cenzer, Irena; Steinman, Michael A

    2016-12-13

    It is unknown whether older adults in the United States would be willing to take a test predictive of future Alzheimer's disease, or whether testing would change behavior. Using a nationally representative sample, we explored who would take a free and definitive test predictive of Alzheimer's disease, and examined how using such a test may impact advance care planning. A cross-sectional study within the 2012 Health and Retirement Study of adults aged 65 years or older asked questions about a test predictive of Alzheimer's disease (N = 874). Subjects were asked whether they would want to take a hypothetical free and definitive test predictive of future Alzheimer's disease. Then, imagining they knew they would develop Alzheimer's disease, subjects rated the chance of completing advance care planning activities from 0 to 100. We classified a score > 50 as being likely to complete that activity. We evaluated characteristics associated with willingness to take a test for Alzheimer's disease, and how such a test would impact completing an advance directive and discussing health plans with loved ones. Overall, 75% (N = 648) of the sample would take a free and definitive test predictive of Alzheimer's disease. Older adults willing to take the test had similar race and educational levels to those who would not, but were more likely to be ≤75 years old (odds ratio 0.71 (95% CI 0.53-0.94)). Imagining they knew they would develop Alzheimer's, 81% would be likely to complete an advance directive, although only 15% had done so already. In this nationally representative sample, 75% of older adults would take a free and definitive test predictive of Alzheimer's disease. Many participants expressed intent to increase activities of advance care planning with this knowledge. This confirms high public interest in predictive testing for Alzheimer's disease and suggests this may be an opportunity to engage patients in advance care planning discussions.

  8. Underground Test Area Quality Assurance Project Plan Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Irene Farnham

    This Quality Assurance Project Plan (QAPP) provides the overall quality assurance (QA) program requirements and general quality practices to be applied to the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Underground Test Area (UGTA) Sub-Project (hereafter the Sub-Project) activities. The requirements in this QAPP are consistent with DOE Order 414.1C, Quality Assurance (DOE, 2005); U.S. Environmental Protection Agency (EPA) Guidance for Quality Assurance Project Plans for Modeling (EPA, 2002); and EPA Guidance on the Development, Evaluation, and Application of Environmental Models (EPA, 2009). The QAPP Revision 0 supersedes DOE--341, Underground Test Area Quality Assurancemore » Project Plan, Nevada Test Site, Nevada, Revision 4.« less

  9. Software verification plan for GCS. [guidance and control software

    NASA Technical Reports Server (NTRS)

    Dent, Leslie A.; Shagnea, Anita M.; Hayhurst, Kelly J.

    1990-01-01

    This verification plan is written as part of an experiment designed to study the fundamental characteristics of the software failure process. The experiment will be conducted using several implementations of software that were produced according to industry-standard guidelines, namely the Radio Technical Commission for Aeronautics RTCA/DO-178A guidelines, Software Consideration in Airborne Systems and Equipment Certification, for the development of flight software. This plan fulfills the DO-178A requirements for providing instructions on the testing of each implementation of software. The plan details the verification activities to be performed at each phase in the development process, contains a step by step description of the testing procedures, and discusses all of the tools used throughout the verification process.

  10. Comprehensive Nuclear-Test-Ban Treaty: Background and Current Developments

    DTIC Science & Technology

    2008-05-28

    testing, and has no plans to test. It has reduced the time needed to conduct a nuclear test. Critics raised concerns about the implications of these...particularly as it is reduced, is reliable and safe. So he has not ruled out testing in the future, but there are no plans to do so.’”4 Critics ...Secretary of State, to Honorable Pete Domenici, United States Senate, June 25, 2007. a ten-year-old moratorium on nuclear weapons testing.”5 Another critic

  11. Degradation Factor Approach for Impacted Composite Structural Assessment: MSFC Center Director's Discretionary Fund Final Report, Project No. 96-17

    NASA Technical Reports Server (NTRS)

    Ortega, R.; Price, J. M.; Fox, D.

    2000-01-01

    This technical memorandum documents the results of the research to develop a concept for assessing the structural integrity of impacted composite structures using the strength degradation factor in conjunction with available finite element tools. For this purpose, a literature search was conducted, a plan for conducting impact testing on two laminates was developed, and a finite element model of the impact process was created. Specimens for the impact testing were fabricated to support the impact testing plan.

  12. The Audiovisual Vocational Preferences Test: A Research Note on Test Development.

    ERIC Educational Resources Information Center

    Wilgosh, Lorraine

    1992-01-01

    This paper reports on the development of the Audiovisual Vocational Preferences Test to facilitate career planning for adolescents and young adults with mild to moderate intellectual impairments. The strategies involved in test construction, data on initial use of the test, and improvements in format and content after pilot testing are discussed.…

  13. Design requirements for SRB production control system. Volume 4: Implementation

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The implementation plan which is presented was developed to provide the means for the successful implementation of the automated production control system. There are three factors which the implementation plan encompasses: detailed planning; phased implementation; and user involvement. The plan is detailed to the task level in terms of necessary activities as the system is developed, refined, installed, and tested. These tasks are scheduled, on a preliminary basis, over a two-and-one-half-year time frame.

  14. Safety and fitness electronic records system (SAFER) : draft master test plan

    DOT National Transportation Integrated Search

    1995-12-31

    The purpose of this plan is to establish a formal set of guidelines and activities to be : adhered to and performed by JHU/APL and the developer to ensure that the SAFER System has been tested successfully and is fully compliant with the SAFER System...

  15. National Aeronautics Research, Development, Test and Evaluation (RDT&E) Infrastructure Plan

    DTIC Science & Technology

    2011-01-01

    addressed in the National Aeronautics R&D Plan, identi- fying unnecessary redundancy solely on the basis of infrastructure required to support H H13 ...near, mid, and far terms, and impact not only scramjet propulsion systems, but potential turbine-based combined cycle systems as well. Turbine Engine...Icing Test Facilities A greater understanding of the impact that icing conditions have on turbine engine opera- tions is needed to develop enhanced

  16. The General Mission Analysis Tool (GMAT) System Test Plan

    NASA Technical Reports Server (NTRS)

    Conway, Darrel J.; Hughes, Steven P.

    2007-01-01

    This document serves as the System Test Approach for the GMAT Project. Preparation for system testing consists of three major stages: 1) The Test Approach sets the scope of system testing, the overall strategy to be adopted, the activities to be completed, the general resources required and the methods and processes to be used to test the release. It also details the activities, dependencies and effort required to conduct the System Test. 2) Test Planning details the activities, dependencies and effort required to conduct the System Test. 3) Test Cases documents the tests to be applied, the data to be processed, the automated testing coverage and the expected results. This document covers the first two of these items, and established the framework used for the GMAT test case development. The test cases themselves exist as separate components, and are managed outside of and concurrently with this System Test Plan.

  17. Development and Evaluation of Educational Programs in Electromechanical Technology. Final Report.

    ERIC Educational Resources Information Center

    Roney, M. W.

    The encompassing objective of this project was to assist two-year colleges in establishing electromechanical technican (EMT) training programs by developing the necessary planning and instructional materials and by providing direct program planning assistance. The research effort of the project was to develop and test an integrated systems of…

  18. Educational Planning Methodology for the Integrated Development of Rural Areas. Reports Studies... S.83.

    ERIC Educational Resources Information Center

    United Nations Educational, Scientific, and Cultural Organization, Paris (France).

    A summary of educational planning methodologies tested in Argentina, Guatemala, Brazil, Ecuador, and Bolivia, the document offers opinions and proposals about integrated rural development. Integrated rural development is seen as a social, economic, political, and cultural process in rural areas, designed to improve living conditions. Chapters…

  19. The International English Language Testing System (IELTS): Its Nature and Development.

    ERIC Educational Resources Information Center

    Ingram, D. E.

    The nature and development of the recently released International English Language Testing System (IELTS) instrument are described. The test is the result of a joint Australian-British project to develop a new test for use with foreign students planning to study in English-speaking countries. It is expected that the modular instrument will become…

  20. Radon Control Activities for Lung Cancer Prevention in National Comprehensive Cancer Control Program Plans, 2005–2011

    PubMed Central

    Stewart, Sherri L.; Angell, William

    2013-01-01

    Introduction Radon is the second leading cause of lung cancer among smokers and the leading cause among nonsmokers. The US Environmental Protection Agency recommends that every home be tested for radon. Comprehensive Cancer Control (CCC) programs develop cancer coalitions that coordinate funding and resources to focus on cancer activities that are recorded in cancer plans. Radon tests, remediation, and radon mitigation techniques are relatively inexpensive, but it is unclear whether coalitions recognize radon as an important carcinogen. Methods We reviewed 65 cancer plans created from 2005 through 2011 for the terms “radon,” “radiation,” or “lung.” Plan activities were categorized as radon awareness, home testing, remediation, supporting radon policy activities, or policy evaluation. We also reviewed each CCC program’s most recent progress report. Cancer plan content was reviewed to assess alignment with existing radon-specific policies in each state. Results Twenty-seven of the plans reviewed (42%) had radon-specific terminology. Improving awareness of radon was included in all 27 plans; also included were home testing (n = 21), remediation (n = 11), support radon policy activities (n = 13), and policy evaluation (n = 1). Three plans noted current engagement in radon activities. Thirty states had radon-specific laws; most (n = 21) were related to radon professional licensure. Eleven states had cancer plan activities that aligned with existing state radon laws. Conclusion Although several states have radon-specific policies, approximately half of cancer coalitions may not be aware of radon as a public health issue. CCC-developed cancer coalitions and plans should prioritize tobacco control to address lung cancer but should consider addressing radon through partnership with existing radon control programs. PMID:23928457

  1. Space Shuttle wind tunnel testing program

    NASA Technical Reports Server (NTRS)

    Whitnah, A. M.; Hillje, E. R.

    1984-01-01

    A major phase of the Space Shuttle Vehicle (SSV) Development Program was the acquisition of data through the space shuttle wind tunnel testing program. It became obvious that the large number of configuration/environment combinations would necessitate an extremely large wind tunnel testing program. To make the most efficient use of available test facilities and to assist the prime contractor for orbiter design and space shuttle vehicle integration, a unique management plan was devised for the design and development phase. The space shuttle program is reviewed together with the evolutional development of the shuttle configuration. The wind tunnel testing rationale and the associated test program management plan and its overall results is reviewed. Information is given for the various facilities and models used within this program. A unique posttest documentation procedure and a summary of the types of test per disciplines, per facility, and per model are presented with detailed listing of the posttest documentation.

  2. A Multi-Year Plan for Research, Development, and Prototype Testing of Standard Modular Hydropower Technology

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Smith, Brennan T.; Welch, Tim; Witt, Adam M.

    The Multi-Year Plan for Research, Development, and Prototype Testing of Standard Modular Hydropower Technology (MYRP) presents a strategy for specifying, designing, testing, and demonstrating the efficacy of standard modular hydropower (SMH) as an environmentally compatible and cost-optimized renewable electricity generation technology. The MYRP provides the context, background, and vision for testing the SMH hypothesis: if standardization, modularity, and preservation of stream functionality become essential and fully realized features of hydropower technology, project design, and regulatory processes, they will enable previously unrealized levels of new project development with increased acceptance, reduced costs, increased predictability of outcomes, and increased value to stakeholders.more » To achieve success in this effort, the MYRP outlines a framework of stakeholder-validated criteria, models, design tools, testing facilities, and assessment protocols that will facilitate the development of next-generation hydropower technologies.« less

  3. ABA Southern Region Burn disaster plan: the process of creating and experience with the ABA southern region burn disaster plan.

    PubMed

    Kearns, Randy D; Cairns, Bruce A; Hickerson, William L; Holmes, James H

    2014-01-01

    The Southern Region of the American Burn Association began to craft a regional plan to address a surge of burn-injured patients after a mass casualty event in 2004. Published in 2006, this plan has been tested through modeling, exercise, and actual events. This article focuses on the process of how the plan was created, how it was tested, and how it interfaces with other ongoing efforts on preparedness. One key to success regarding how people respond to a disaster can be traced to preexisting relationships and collaborations. These activities would include training or working together and building trust long before the crisis. Knowing who you can call and rely on when you need help, within the context of your plan, can be pivotal in successfully managing a disaster. This article describes how a coalition of burn center leaders came together. Their ongoing personal association has facilitated the development of planning activities and has kept the process dynamic. This article also includes several of the building blocks for developing a plan from creation to composition, implementation, and testing. The plan discussed here is an example of linking leadership, relationships, process, and documentation together. On the basis of these experiences, the authors believe these elements are present in other regions. The intent of this work is to share an experience and to offer it as a guide to aid others in their regional burn disaster planning efforts.

  4. An Evaluation Study of the Efficacy of Pupil Educational Plans as Developed by School Assessment Teams in the Sequoia Union High School District.

    ERIC Educational Resources Information Center

    Stephens, Thomas W.

    Ten mainstreamed learning disabled high school students received treatment with an informal assessment and an educational plan. Analysis of pre and post tests (Peabody Individual Achievement Test, Revised Piers-Harris Self-Concept Scale, and Teacher Perception Survey) indicated that Ss performed better on achievement tests, were enrolled in more…

  5. Transuranic Waste Test Facility Development Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Looper, M.G.

    1987-05-05

    This letter discusses the development and test program planned for the Transuranic Waste Test Facility (TWTF). The planned effort is based on previous work in the ADandD Pilot Facility and testing of TWTF equipment before installation. Input from Waste Management and AED Fairview is included. The program will focus on the following areas: Retrieval; Material Handling; Size Reduction; Operation and Maintenance. The program will take 1-1/2 to 2 years to complete and began in December 1986. Technical Data Summaries (TDS) and basic data reports will be issued periodically to document results and provide basic data for the Transuranic Waste Facilitymore » (TWF). 2 refs., 2 figs.« less

  6. Design techniques for developing a computerized instrumentation test plan. [for wind tunnel test data acquisition system

    NASA Technical Reports Server (NTRS)

    Burnett, S. Kay; Forsyth, Theodore J.; Maynard, Everett E.

    1987-01-01

    The development of a computerized instrumentation test plan (ITP) for the NASA/Ames Research Center National Full Scale Aerodynamics Complex (NFAC) is discussed. The objective of the ITP program was to aid the instrumentation engineer in documenting the configuration and calibration of data acquisition systems for a given test at any of four low speed wind tunnel facilities (Outdoor Aerodynamic Research Facility, 7 x 10, 40 x 80, and 80 x 120) at the NFAC. It is noted that automation of the ITP has decreased errors, engineering hours, and setup time while adding a higher level of consistency and traceability.

  7. Test plan for performance testing of the Eaton AC-3 electric vehicle

    NASA Astrophysics Data System (ADS)

    Crumley, R.; Heiselmann, H. W.

    1985-04-01

    An alternating current (ac) propulsion system for an electric vehicle was developed and tested. The test bed vehicle is a modified 1981 Mercury Lynx. The test plan was prepared specifically for the third modification to this test bed and identified as the Eaton AC-3. The scope of the testing done on the Eaton AC-3 includes coastdown and dynamometer tests but does not include environmental, on-road, or track testing. Coastdown testing is performed in accordance with SAE J-1263 (SAE Recommended Practice for Road Load Measurement and Dynamometer Simulation Using Coastdown Techniques).

  8. A Study of Facilities and Infrastructure Planning, Prioritization, and Assessment at Federal Security Laboratories

    DTIC Science & Technology

    2012-11-01

    Research , Development, Test , and Evaluation (RDT&E) Appropriations The RDT&E appropriation consists of the mission program budgets for all... research , development, test and evaluation work performed by contractors and government installations and includes an installations and activities budget...than $4,000,000. 9 f. Research , Development, Test , and Evaluation Appropriations The Research , Development, Test , and Evaluation (RDT&E

  9. NASA ATP Force Measurement Technology Capability Strategic Plan

    NASA Technical Reports Server (NTRS)

    Rhew, Ray D.

    2008-01-01

    The Aeronautics Test Program (ATP) within the National Aeronautics and Space Administration (NASA) Aeronautics Research Mission Directorate (ARMD) initiated a strategic planning effort to re-vitalize the force measurement capability within NASA. The team responsible for developing the plan included members from three NASA Centers (Langley, Ames and Glenn) as well as members from the Air Force s Arnold Engineering and Development Center (AEDC). After visiting and discussing force measurement needs and current capabilities at each participating facility as well as selected force measurement companies, a strategic plan was developed to guide future NASA investments. This paper will provide the details of the strategic plan and include asset management, organization and technology research and development investment priorities as well as efforts to date.

  10. Budget model can aid group practice planning.

    PubMed

    Bender, A D

    1991-12-01

    A medical practice can enhance its planning by developing a budgetary model to test effects of planning assumptions on its profitability and cash requirements. A model focusing on patient visits, payment mix, patient mix, and fee and payment schedules can help assess effects of proposed decisions. A planning model is not a substitute for planning but should complement a plan that includes mission, goals, values, strategic issues, and different outcomes.

  11. An Empirical Test of the Theory of Planned Behaviour Applied to Contraceptive Use in Rural Uganda

    PubMed Central

    Kiene, Susan M.; Hopwood, Sarah; Lule, Haruna; Wanyenze, Rhoda K.

    2013-01-01

    There is a high unmet need for contraceptives in developing countries such as Uganda, with high population growth, where efforts are needed to promote family planning and contraceptive use. Despite this high need, little research has investigated applications of health behaviour change theories to contraceptive use amongst this population. The present study tested the Theory of Planned Behaviour’s ability to predict contraceptive use-related behaviours among postpartum women in rural Uganda. Results gave modest support to the theory’s application and suggest an urgent need for improved theory-based interventions to promote contraceptive use in the populations of developing countries. PMID:23928989

  12. V/STOL wind-tunnel testing

    NASA Technical Reports Server (NTRS)

    Koenig, D. G.

    1984-01-01

    Factors influencing effective program planning for V/STOL wind-tunnel testing are discussed. The planning sequence itself, which includes a short checklist of considerations that could enhance the value of the tests, is also described. Each of the considerations, choice of wind tunnel, type of model installation, model development and test operations, is discussed, and examples of appropriate past and current V/STOL test programs are provided. A short survey of the moderate to large subsonic wind tunnels is followed by a review of several model installations, from two-dimensional to large-scale models of complete aircraft configurations. Model sizing, power simulation, and planning are treated, including three areas is test operations: data-acquisition systems, acoustic measurements in wind tunnels, and flow surveying.

  13. Project W-314 specific test and evaluation plan for AZ tank farm upgrades

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hays, W.H.

    1998-08-12

    The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made by the addition of the SN-631 transfer line from the AZ-O1A pit to the AZ-02A pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system`s performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation P1 an (TEP). Testing includes Validations and Verifications (e.g., Commercial Grade Item Dedication activities, etc), Factory Tests and Inspections (FTIs), installation tests andmore » inspections, Construction Tests and Inspections (CTIs), Acceptance Test Procedures (ATPs), Pre-Operational Test Procedures (POTPs), and Operational Test Procedures (OTPs). The STEP will be utilized in conjunction with the TEP for verification and validation.« less

  14. Summary of Current and Future MSFC International Space Station Environmental Control and Life Support System Activities

    NASA Technical Reports Server (NTRS)

    Ray, Charles D.; Carrasquillo, Robyn L.; Minton-Summers, Silvia

    1997-01-01

    This paper provides a summary of current work accomplished under technical task agreement (TTA) by the Marshall Space Flight Center (MSFC) regarding the Environmental Control and Life Support System (ECLSS) as well as future planning activities in support of the International Space Station (ISS). Current activities include ECLSS computer model development, component design and development, subsystem integrated system testing, life testing, and government furnished equipment delivered to the ISS program. A long range plan for the MSFC ECLSS test facility is described whereby the current facility would be upgraded to support integrated station ECLSS operations. ECLSS technology development efforts proposed to be performed under the Advanced Engineering Technology Development (AETD) program are also discussed.

  15. 30 CFR 282.20 - Obligations and responsibilities of lessees.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... the approved Delineation, Testing, or Mining Plans; and other written or oral orders or instructions issued by the Director when performing exploration, testing, development, and production activities..., testing, development, and production operations on the lease available to the Director for examination and...

  16. Development of a Comprehensive and Interactive Tool to Inform State Violence and Injury Prevention Plans.

    PubMed

    Wilson, Lauren; Deokar, Angela J; Zaesim, Araya; Thomas, Karen; Kresnow-Sedacca, Marcie-Jo

    The Center of Disease Control and Prevention's Core State Violence and Injury Prevention Program (Core SVIPP) provides an opportunity for states to engage with their partners to implement, evaluate, and disseminate strategies that lead to the reduction and prevention of injury and violence. Core SVIPP requires awardees to develop or update their state injury and violence plans. Currently, literature informing state planning efforts is limited, especially regarding materials related to injury and violence. Presumably, plans that are higher quality result in having a greater impact on preventing injury and violence, and literature to improve quality would benefit prevention programming. (1) To create a comprehensive injury-specific index to aid in the development and revision of state injury and violence prevention plans, and (2) to assess the reliability and utility of this index. Through an iterative development process, a workgroup of subject matter experts created the Violence and Injury Prevention: Comprehensive Index Tool (VIP:CIT). The tool was pilot tested on 3 state injury and violence prevention plans and assessed for initial usability. Following revisions to the tool (ie, a rubric was developed to further delineate consistent criteria for rating; items were added and clarified), the same state plans were reassessed to test interrater reliability and tool utility. For the second assessment, reliability of the VIP:CIT improved, indicating that the rubric was a useful addition. Qualitative feedback from states suggested that the tool significantly helped guide plan development and communicate about planning processes. The final VIP:CIT is a tool that can help increase plan quality, decrease the research-to-practice gap, and increase connectivity to emerging public health paradigms. The tool provides an example of tailoring guidance materials to reflect academic literature, and it can be easily adapted to other topic areas to promote quality of strategic plans for numerous outcomes.

  17. Development of a Comprehensive and Interactive Tool to Inform State Violence and Injury Prevention Plans

    PubMed Central

    Wilson, Lauren; Deokar, Angela J.; Zaesim, Araya; Thomas, Karen; Kresnow-Sedacca, Marcie-jo

    2018-01-01

    Context The Center of Disease Control and Prevention’s Core State Violence and Injury Prevention Program (Core SVIPP) provides an opportunity for states to engage with their partners to implement, evaluate, and disseminate strategies that lead to the reduction and prevention of injury and violence. Core SVIPP requires awardees to develop or update their state injury and violence plans. Currently, literature informing state planning efforts is limited, especially regarding materials related to injury and violence. Presumably, plans that are higher quality result in having a greater impact on preventing injury and violence, and literature to improve quality would benefit prevention programming. Objective (1) To create a comprehensive injury-specific index to aid in the development and revision of state injury and violence prevention plans, and (2) to assess the reliability and utility of this index. Design Through an iterative development process, a workgroup of subject matter experts created the Violence and Injury Prevention: Comprehensive Index Tool (VIP:CIT). The tool was pilot tested on 3 state injury and violence prevention plans and assessed for initial usability. Following revisions to the tool (ie, a rubric was developed to further delineate consistent criteria for rating; items were added and clarified), the same state plans were reassessed to test interrater reliability and tool utility. Results For the second assessment, reliability of the VIP:CIT improved, indicating that the rubric was a useful addition. Qualitative feedback from states suggested that the tool significantly helped guide plan development and communicate about planning processes. Conclusion The final VIP:CIT is a tool that can help increase plan quality, decrease the research-to-practice gap, and increase connectivity to emerging public health paradigms. The tool provides an example of tailoring guidance materials to reflect academic literature, and it can be easily adapted to other topic areas to promote quality of strategic plans for numerous outcomes. PMID:29189505

  18. Efficient concepts for large erectable space structures

    NASA Technical Reports Server (NTRS)

    Card, M. F.; Bush, H. G.; Heard, W. L., Jr.; Mikulas, M. M., Jr.

    1978-01-01

    The status of Langley Research Center development of the nestable column concept is reviewed including results of member and truss component tests, and planned assembly studies. In addition, more recent studies of alternative member concepts are presented. Preliminary results on relative efficiency of several types of truss-type columns are compared and future test plans discussed.

  19. On My Mind: Pay It Forward with Professional Development, Not High-Stakes Testing.

    ERIC Educational Resources Information Center

    Warlick, David

    2001-01-01

    Suggests that professional planning, not high-stakes testing, "an Industrial Age solution to an Information Age problem," is the key to education's future. Proposes that the day for school library media specialists and teachers should be equally divided between teaching and professional planning-four hours of instructional supervision and four…

  20. Distributing an Online Catalog on CD-ROM...The University of Illinois Experience.

    ERIC Educational Resources Information Center

    Watson, Paula D.; Golden, Gary A.

    1987-01-01

    Description of the planning of a project designed to test the feasibility of distributing a statewide union catalog database on optical disk discusses the relationship of the project's goals to those of statewide library development; dealing with vendors in a volatile, high technology industry; and plans for testing and evaluation. (EM)

  1. Global Test Range: Toward Airborne Sensor Webs

    NASA Technical Reports Server (NTRS)

    Mace, Thomas H.; Freudinger, Larry; DelFrate John H.

    2008-01-01

    This viewgraph presentation reviews the planned global sensor network that will monitor the Earth's climate, and resources using airborne sensor systems. The vision is an intelligent, affordable Earth Observation System. Global Test Range is a lab developing trustworthy services for airborne instruments - a specialized Internet Service Provider. There is discussion of several current and planned missions.

  2. A Collaborative Web-Based Approach to Planning Research, Integration, and Testing Using a Wiki

    NASA Technical Reports Server (NTRS)

    Delaney, Michael M.; Koshimoto, Edwin T.; Noble, Deleena; Duggan, Christopher

    2010-01-01

    The National Aeronautics and Space Administration Integrated Vehicle Health Management program touches on many different research areas while striving to enable the automated detection, diagnosis, prognosis, and mitigation of adverse events at the aircraft and system level. At the system level, the research focus is on the evaluation of multidisciplinary integrated methods, tools, and technologies for achieving the program goal. The participating program members form a diverse group of government, industry, and academic researchers. The program team developed the Research and Test Integration Plan in order to track significant test and evaluation activities, which are important for understanding, demonstrating, and communicating the overall project state and project direction. The Plan is a living document, which allows the project team the flexibility to construct conceptual test scenarios and to track project resources. The Plan also incorporates several desirable feature requirements for Plan users and maintainers. A wiki has proven to be the most efficient and effective means of implementing the feature requirements for the Plan. The wiki has proven very valuable as a research project management tool, and there are plans to expand its scope.

  3. When a Crisis Strikes.

    ERIC Educational Resources Information Center

    Keebler, Barbara A.

    1989-01-01

    Urges Catholic educators to develop a crisis communication plan to ensure that all communication with the press and public is handled promptly and thoroughly by a designated spokesperson. Describes workshops which simulate real-life challenges as a means of testing crisis management plans. Offers guidelines for the development of a crisis…

  4. Quiet, Efficient Fans for Spaceflight: An Overview of NASA's Technology Development Plan

    NASA Technical Reports Server (NTRS)

    Koch, L. Danielle

    2010-01-01

    A Technology Development Plan to improve the aerodynamic and acoustic performance of spaceflight fans has been submitted to NASA s Exploration Technology Development Program. The plan describes a research program intended to make broader use of the technology developed at NASA Glenn to increase the efficiency and reduce the noise of aircraft engine fans. The goal is to develop a set of well-characterized government-owned fans nominally suited for spacecraft ventilation and cooling systems. NASA s Exploration Life Support community will identify design point conditions for the fans in this study. Computational Fluid Dynamics codes will be used in the design and analysis process. The fans will be built and used in a series of tests. Data from aerodynamic and acoustic performance tests will be used to validate performance predictions. These performance maps will also be entered into a database to help spaceflight fan system developers make informed design choices. Velocity measurements downstream of fan rotor blades and stator vanes will also be collected and used for code validation. Details of the fan design, analysis, and testing will be publicly reported. With access to fan geometry and test data, the small fan industry can independently evaluate design and analysis methods and work towards improvement.

  5. Airbreathing Hypersonic Technology Vision Vehicles and Development Dreams

    NASA Technical Reports Server (NTRS)

    McClinton, C. R.; Hunt, J. L.; Ricketts, R. H.; Reukauf, P.; Peddie, C. L.

    1999-01-01

    Significant advancements in hypersonic airbreathing vehicle technology have been made in the country's research centers and industry over the past 40 years. Some of that technology is being validated with the X-43 flight tests. This paper presents an overview of hypersonic airbreathing technology status within the US, and a hypersonic technology development plan. This plan builds on the nation's large investment in hypersonics. This affordable, incremental plan focuses technology development on hypersonic systems, which could be operating by the 2020's.

  6. Full power level development of the Space Shuttle main engine

    NASA Technical Reports Server (NTRS)

    Johnson, J. R.; Colbo, H. I.

    1982-01-01

    Development of the Space Shuttle main engine for nominal operation at full power level (109 percent rated power) is continuing in parallel with the successful flight testing of the Space Transportation System. Verification of changes made to the rated power level configuration currently being flown on the Orbiter Columbia is in progress and the certification testing of the full power level configuration has begun. The certification test plan includes the accumulation of 10,000 seconds on each of two engines by early 1983. Certification testing includes the simulation of nominal mission duty cycles as well as the two abort thrust profiles: abort to orbit and return to launch site. Several of the certification tests are conducted at 111 percent power to demonstrate additional safety margins. In addition to the flight test and development program results, future plans for life demonstration and engine uprating will be discussed.

  7. On-ground tests of the NISP infrared spectrometer instrument for Euclid

    NASA Astrophysics Data System (ADS)

    Jomni, Cyril; Ealet, Anne; Gillard, William; Prieto, Éric; Grupp, Frank U.

    2017-09-01

    Euclid is an ESA mission dedicated to understand the acceleration of the expansion of the Universe. The mission will measure hundred of millions of galaxies in spectrophotometry and photometry in the near infrared thanks to a spectro-photometer called NISP. This instrument will be assembled and tested in Marseille. To prepare the on-ground test plan and develop the test procedure, we have used simulated PSF images, based on a Zemax optical design of the instrument. We have developed the analysis tools that will be further used to build the procedure verification. We present here the method and analysis results to adjust the focus of the instrument. We will in particular show that because of the sampling of the PSF, a dithering strategy should be adapted and will constraint the development of the test plan.

  8. Manned Orbital Transfer Vehicle (MOTV). Volume 5: Turnaround analysis

    NASA Technical Reports Server (NTRS)

    Boyland, R. E.; Sherman, S. W.; Morfin, H. W.

    1979-01-01

    The development of a low-cost reliable turnaround process to employ the MOTV in enhancing the utilization of the geosynchronous space region is analyzed. It is indicated that a routine effective turnaround/maintenance plan must make maximum use of flight data for maintenance planning, a high degree of test automation, and MOTV maintainability features in order to minimize tests, facilitate repair, and reduce manpower requirements. An effective turnaround plan provides a payback of reduced risks.

  9. Computer-Assisted School Facility Planning with ONPASS.

    ERIC Educational Resources Information Center

    Urban Decision Systems, Inc., Los Angeles, CA.

    The analytical capabilities of ONPASS, an on-line computer-aided school facility planning system, are described by its developers. This report describes how, using the Canoga Park-Winnetka-Woodland Hills Planning Area as a test case, the Department of City Planning of the city of Los Angeles employed ONPASS to demonstrate how an on-line system can…

  10. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gauglitz, Phillip A.; Bontha, Jagannadha R.; Daniel, Richard C.

    The Hanford Waste Treatment and Immobilization Plant (WTP) is currently being designed and constructed to pretreat and vitrify a large portion of the waste in the 177 underground waste storage tanks at the Hanford Site. A number of technical issues related to the design of the pretreatment facility (PTF) of the WTP have been identified. These issues must be resolved prior to the U.S. Department of Energy (DOE) Office of River Protection (ORP) reaching a decision to proceed with engineering, procurement, and construction activities for the PTF. One of the issues is Technical Issue T1 - Hydrogen Gas Release frommore » Vessels (hereafter referred to as T1). The focus of T1 is identifying controls for hydrogen release and completing any testing required to close the technical issue. In advance of selecting specific controls for hydrogen gas safety, a number of preliminary technical studies were initiated to support anticipated future testing and to improve the understanding of hydrogen gas generation, retention, and release within PTF vessels. These activities supported the development of a plan defining an overall strategy and approach for addressing T1 and achieving technical endpoints identified for T1. Preliminary studies also supported the development of a test plan for conducting testing and analysis to support closing T1. Both of these plans were developed in advance of selecting specific controls, and in the course of working on T1 it was decided that the testing and analysis identified in the test plan were not immediately needed. However, planning activities and preliminary studies led to significant technical progress in a number of areas. This report summarizes the progress to date from the preliminary technical studies. The technical results in this report should not be used for WTP design or safety and hazards analyses and technical results are marked with the following statement: “Preliminary Technical Results for Planning – Not to be used for WTP Design or Safety Analyses.”« less

  11. Shuttle/Agena study. Volume 2, part 3: Preliminary test plans

    NASA Technical Reports Server (NTRS)

    1972-01-01

    Proposed testing for the Agena tug program is based upon best estimates of shuttle and Agena tug requirements and upon the Agena configuration currently envisioned to meet these requirements. The proposed tests are presented in development, qualification, system, and launch base test plans. These plans are based upon generalized requirements and assumed situations. The limitations of this study precluded all but minimal consideration of related shuttle orbiter and shuttle ground systems. The test plans include provisions for all testing from major component to systems level, identified as necessary to aid in confirmation of the modified Agena configuration for the space tug; considerations that crew safety requirements and new environmental conditions from shuttle interface effects do impose some new Agena testing requirements; considerations that many existing Agena flight-qualified components will be utilized and qualification testing will be minimal; testing not only for the Agena tug but also for new or modified items of handling or servicing equipment for supporting the Agena factory-to-launch sequence; and the assembly of required testing into a sequence-ordered series of events.

  12. Project W-314 specific test and evaluation plan for transfer line SN-633 (241-AX-B to 241-AY-02A)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hays, W.H.

    1998-03-20

    The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made by the addition of the SN-633 transfer line by the W-314 Project. The STEP develops the outline for test procedures that verify the system`s performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP). This STEP encompasses all testing activities required to demonstrate compliance to the project design criteria as it relates to the addition of transfer line SN-633. The Project Design Specificationsmore » (PDS) identify the specific testing activities required for the Project. Testing includes Validations and Verifications (e.g., Commercial Grade Item Dedication activities), Factory Acceptance Tests (FATs), installation tests and inspections, Construction Acceptance Tests (CATs), Acceptance Test Procedures (ATPs), Pre-Operational Test Procedures (POTPs), and Operational Test Procedures (OTPs). It should be noted that POTPs are not required for testing of the transfer line addition. The STEP will be utilized in conjunction with the TEP for verification and validation.« less

  13. SWI 1.10 Testing Process

    NASA Technical Reports Server (NTRS)

    Stokes, LeBarian

    2009-01-01

    This procedure establishes a system for performing testing in the Six-Degree-Of-Freedom Dynamic Test System (SDTS). Testing includes development and verification testing of customer supplied Test Articles (TAs) and other testing requirements, as requested. This procedure applies to all SDTS testing operations and equipment. The procedure provides an overview of testing performed in the SDTS including test identification requirements, test planning and procedure development, test and performance inspection, test data analysis, and test report generation.

  14. Marketing and Distribution: A Team Plan for In-Service Follow-Up

    ERIC Educational Resources Information Center

    Mason, Ralph E.

    1976-01-01

    Distributive education (DE) teacher education universities in Indiana completed a consortium testing an exemplary plan to use in followup service activities with first- and second-year distributive education teachers. How the plan was developed and ways in which it was successful are discussed. (HD)

  15. Online Learning Flight Control for Intelligent Flight Control Systems (IFCS)

    NASA Technical Reports Server (NTRS)

    Niewoehner, Kevin R.; Carter, John (Technical Monitor)

    2001-01-01

    The research accomplishments for the cooperative agreement 'Online Learning Flight Control for Intelligent Flight Control Systems (IFCS)' include the following: (1) previous IFC program data collection and analysis; (2) IFC program support site (configured IFC systems support network, configured Tornado/VxWorks OS development system, made Configuration and Documentation Management Systems Internet accessible); (3) Airborne Research Test Systems (ARTS) II Hardware (developed hardware requirements specification, developing environmental testing requirements, hardware design, and hardware design development); (4) ARTS II software development laboratory unit (procurement of lab style hardware, configured lab style hardware, and designed interface module equivalent to ARTS II faceplate); (5) program support documentation (developed software development plan, configuration management plan, and software verification and validation plan); (6) LWR algorithm analysis (performed timing and profiling on algorithm); (7) pre-trained neural network analysis; (8) Dynamic Cell Structures (DCS) Neural Network Analysis (performing timing and profiling on algorithm); and (9) conducted technical interchange and quarterly meetings to define IFC research goals.

  16. AMSD Cryo Actuator Testing

    NASA Technical Reports Server (NTRS)

    Mullette, Mark; Matthews, Gary; Russell, Kevin (Technical Monitor)

    2002-01-01

    The actuator technology required for AMSD and subsequently NGST are critical in the successful development for future cryogenic systems. Kodak has undertaken an extensive test plan to determine the performance of the force actuators developed under the AMSD program. These actuators are currently in testing at MSFC and are expected to finish this test cycle in early June 2002.

  17. A GRE Test for the STEM Disciplines: Developing an Assessment "of" and "for" Learning

    ERIC Educational Resources Information Center

    Payne, David G.; Briel, Jacqueline B.; Hawthorn, John; Riedeburg, Karen

    2006-01-01

    Plans are described for creating a Graduate Record Examination (GRE) test for the STEM (science, technology, engineering, and mathematics) disciplines. Previous work showed that a quantitative measure for the STEM disciplines exacerbated group differences beyond those reflected in the current GRE General Test. A test development approach is…

  18. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Roper, J; Bradshaw, B; Godette, K

    Purpose: To create a knowledge-based algorithm for prostate LDR brachytherapy treatment planning that standardizes plan quality using seed arrangements tailored to individual physician preferences while being fast enough for real-time planning. Methods: A dataset of 130 prior cases was compiled for a physician with an active prostate seed implant practice. Ten cases were randomly selected to test the algorithm. Contours from the 120 library cases were registered to a common reference frame. Contour variations were characterized on a point by point basis using principle component analysis (PCA). A test case was converted to PCA vectors using the same process andmore » then compared with each library case using a Mahalanobis distance to evaluate similarity. Rank order PCA scores were used to select the best-matched library case. The seed arrangement was extracted from the best-matched case and used as a starting point for planning the test case. Computational time was recorded. Any subsequent modifications were recorded that required input from a treatment planner to achieve an acceptable plan. Results: The computational time required to register contours from a test case and evaluate PCA similarity across the library was approximately 10s. Five of the ten test cases did not require any seed additions, deletions, or moves to obtain an acceptable plan. The remaining five test cases required on average 4.2 seed modifications. The time to complete manual plan modifications was less than 30s in all cases. Conclusion: A knowledge-based treatment planning algorithm was developed for prostate LDR brachytherapy based on principle component analysis. Initial results suggest that this approach can be used to quickly create treatment plans that require few if any modifications by the treatment planner. In general, test case plans have seed arrangements which are very similar to prior cases, and thus are inherently tailored to physician preferences.« less

  19. The Consolidated Planning and Scheduling System for Space Transportation and Space Station operations - Successful development experience

    NASA Technical Reports Server (NTRS)

    Hornstein, Rhoda S.; Willoughby, John K.; Gardner, Jo A.; Shinkle, Gerald L.

    1993-01-01

    In 1992, NASA made the decision to evolve a Consolidated Planning System (CPS) by adding the Space Transportation System (STS) requirements to the Space Station Freedom (SSF) planning software. This paper describes this evolutionary process, which began with a series of six-month design-build-test cycles, using a domain-independent architecture and a set of developmental tools known as the Advanced Scheduling Environment. It is shown that, during these tests, the CPS could be used at multiple organizational levels of planning and for integrating schedules from geographically distributed (including international) planning environments. The potential for using the CPS for other planning and scheduling tasks in the SSF program is being currently examined.

  20. Developing Expertise in Military Communications Planning: Do Verbal Reports Change with Experience?

    ERIC Educational Resources Information Center

    McIlroy, Rich C.; Stanton, Neville A.; Remington, Bob

    2012-01-01

    The purpose of this study was to investigate novices learning to use a mission planning system. Novice participants received one training session, followed by three test sessions. This was compared to expert performance. During the test sessions, all participants were required to "think aloud", based on Ericsson and Simon's (Ericsson, K.A. and…

  1. In situ gas treatment technology demonstration test plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Thornton, E.C.; Miller, R.D.

    1996-02-16

    This document defines the objectives and requirements associated with undertaking a field demonstration of an in situ gas treatment appoach to remediation chromate-contaminated soil. The major tasks presented in this plan include the design and development of the surface gas treatment system, performance of permitting activities, and completion of site preparation and field testing activities.

  2. A Perspective on Development Flight Instrumentation and Flight Test Analysis Plans for Ares I-X

    NASA Technical Reports Server (NTRS)

    Huebner, Lawrence D.; Richards, James S.; Brunty, Joseph A.; Smith, R. Marshall; Trombetta, Dominic R.

    2009-01-01

    NASA. s Constellation Program will take a significant step toward completion of the Ares I crew launch vehicle with the flight test of Ares I-X and completion of the Ares I-X post-flight evaluation. The Ares I-X flight test vehicle is an ascent development flight test that will acquire flight data early enough to impact the design and development of the Ares I. As the primary customer for flight data from the Ares I-X mission, Ares I has been the major driver in the definition of the Development Flight Instrumentation (DFI). This paper focuses on the DFI development process and the plans for post-flight evaluation of the resulting data to impact the Ares I design. Efforts for determining the DFI for Ares I-X began in the fall of 2005, and significant effort to refine and implement the Ares I-X DFI has been expended since that time. This paper will present a perspective in the development and implementation of the DFI. Emphasis will be placed on the process by which the list was established and changes were made to that list due to imposed constraints. The paper will also discuss the plans for the analysis of the DFI data following the flight and a summary of flight evaluation tasks to be performed in support of tools and models validation for design and development.

  3. Development of a Mobile App for Family Planning Providers.

    PubMed

    Halsall, Viannella; Rogers, Jennifer; Witt, Jacki; Song, Sejun; Nguyen, Hoang Duc Huy; Kelly, Patricia

    To provide an overview of lessons learned during the development process of an app for iOS and Android based on national recommendations for providing quality family planning services. After a review of existing apps was conducted to determine whether an app of clinical recommendations for family planning existed, a team of clinicians, training specialists, and app developers created a resource app by first drafting a comprehensive content map. A prototype of the app was then pilot tested using smart tablets by a volunteer convenience sample of women's healthcare professionals. Outcomes measured included usability, acceptability, download analytics, and satisfaction by clinicians as reported through an investigator-developed tool. Sixty-nine professionals tested a prototype of the app, and completed a user satisfaction tool. Overall, user feedback was positive, and a zoom function was added to the final version as a result of the pilot test. Within 3 months of being publicly available, the app was downloaded 677 times, with 97% of downloads occurring on smart phones, 76% downloads occurring on iOS devices, and 24% on Android devices. This trend persisted throughout the following 3 months. Clinicians with an interest in developing an app should consider a team approach to development, pilot test the app prior to wider distribution, and develop a web-based version of the app to be used by clinicians who are unable to access smart devices in their practice setting.

  4. Single Event Effects (SEE) Testing: Practical Approach to Test Plans

    NASA Technical Reports Server (NTRS)

    LaBel, Kenneth A.; Pellish, Jonathan Allen; Berg, Melanie D.

    2014-01-01

    While standards and guidelines for performing SEE testing have existed for several decades, guidance for developing SEE test plans has not been as easy to find. In this presentation, the variety of areas that need to be considered ranging from resource issues (funds, personnel, schedule) to extremely technical challenges (particle interaction and circuit application), shall be discussed. Note: we consider the approach outlined here as a "living" document: Mission-specific constraints and new technology related issues always need to be taken into account.

  5. An empirical test of the Theory of Planned Behaviour applied to contraceptive use in rural Uganda.

    PubMed

    Kiene, Susan M; Hopwood, Sarah; Lule, Haruna; Wanyenze, Rhoda K

    2014-12-01

    There is a high unmet need for contraceptives in developing countries such as Uganda, with high population growth, where efforts are needed to promote family planning and contraceptive use. Despite this high need, little research has investigated applications of health-behaviour-change theories to contraceptive use among this population. This study tested the Theory of Planned Behaviour's ability to predict contraceptive-use-related behaviours among post-partum women in rural Uganda. Results gave modest support to the theory's application and suggest an urgent need for improved theory-based interventions to promote contraceptive use in the populations of developing countries. © The Author(s) 2013.

  6. PROGRAM ASTEC (ADVANCED SOLAR TURBO ELECTRIC CONCEPT). PART IV. SOLAR COLLECTOR DEVELOPMENT SUPPORT TASKS. VOL. VII. ENGINEERING DEVELOPMENT GROUND TEST PLAN FOR THE ASTEC SOLAR ENERGY COLLECTOR.

    DTIC Science & Technology

    optical, and structural integrity of the full scale ASTEC solar collector before further development proceeds. This document specifies these initial...engineering ground tests recommended for testing petals and other critical components of the ASTEC collector. It defines the requirements and

  7. ADEPT - A Mechanically Deployable Entry System Technology in Development at NASA

    NASA Technical Reports Server (NTRS)

    Venkatapathy, Ethiraj; Wercinski, Paul; Cassell, Alan; Smith, Brandon; Yount, Bryan

    2016-01-01

    The proposed presentation will give an overview of a mechanically deployable entry system concept development with a comprehensive summary of the ground tests and design development completed to-date, and current plans for a small-scale flight test in the near future.

  8. Integrated Advanced Sounding Unit-A (AMSU-A). Configuration Management Plan

    NASA Technical Reports Server (NTRS)

    Cavanaugh, J.

    1996-01-01

    The purpose of this plan is to identify the baseline to be established during the development life cycle of the integrated AMSU-A, and define the methods and procedures which Aerojet will follow in the implementation of configuration control for each established baseline. Also this plan establishes the Configuration Management process to be used for the deliverable hardware, software, and firmware of the Integrated AMSU-A during development, design, fabrication, test, and delivery.

  9. The 25 kW power module evolution study. Part 3: Conceptual designs for power module evolution. Volume 2: Program plans

    NASA Technical Reports Server (NTRS)

    1979-01-01

    A plan is presented for the evolutionary development and deployment of the power module system with performance capabilities required to support the 1983 to 1990 user requirements. Aspects summarized include program functional, operational, and hardware elements; program work breakdown and specification items; development plans and schedules for developmental and technology milestones; test concepts and timeliness; and ground and orbit operations concepts.

  10. Using Proactivity, Time Discounting, and the Theory of Planned Behavior to Identify Predictors of Retirement Planning

    ERIC Educational Resources Information Center

    Griffin, Barbara; Loe, David; Hesketh, Beryl

    2012-01-01

    This study developed and tested a model to identify the predictors of retirement planning based on an extension of the theory of planned behavior ([TPB], Ajzen, 1991) that included individual differences in proactivity and time discounting. The results showed that personal attitudes, sense of control, social influence, and stable traits have a…

  11. Development and sensitivity testing of alternative mobility metrics.

    DOT National Transportation Integrated Search

    2012-03-01

    The Oregon Highway Plan's (OHP) mobility policies guide various planning and programming activities of the Oregon Department of Transportation (ODOT). Among these activities are ODOT's land use change review responsibilities under the Transportation ...

  12. Development and sensitivity testing of alternative mobility metrics.

    DOT National Transportation Integrated Search

    2012-03-01

    The Oregon Highway Plans (OHP) mobility policies guide various planning and programming activities of the Oregon : Department of Transportation (ODOT). Among these activities are ODOTs land use change review responsibilities under : the Transpo...

  13. Manned remote work station development article. Volume 3: Development test plan. Appendix A: Manufacturing requirements/schedule

    NASA Technical Reports Server (NTRS)

    1979-01-01

    The tests and procedures for the manned remote work station (MRWS) open cherry picker (OCP) development test article (DTA) are described to validate systems requirements and performance specifications. A development test program is outlined to evaluate key design issues and man/machine interfaces when the MRWS OCP is used in a shuttle support role of satellite servicing and in orbit construction of large structures.

  14. Design for effective development and prototyping of the HL-20

    NASA Astrophysics Data System (ADS)

    Urie, David M.; Floreck, Paul A.; McMorris, John A.; Elvin, John D.

    1993-10-01

    A feasibility study of the HL-20 personnel launch system (PLS) concept was conducted by a team which focused on creating a PLS design approach and an accelerated development plan consistent with the historical 'Skunk Works' approach to rapid prototyping. Technical design, manufacturing, system testing, and operations and support elements of the predefined baseline concept were evaluated. An initial phase program, featuring a concurrent system test during design and development, leading to the orbital flight of an unmanned HL-20 prototype on a Titan III launch system, was prescribed. A second-phase development and manufacturing plan leading to system operational status was also formulated. Baseline design feature modifications were made when necessary, without compromise to performance, to satisfy the prototype development plan. Technical design details and off-the-shelf hardware candidates were also identified for several subsystems, including the launch-system interface adapter/emergency escape system. The technical feasibility of the system and applicability of the Skunk Works approach to development of the HL-20/PLS were verified.

  15. Life-finding detector development at NASA GSFC using a custom H4RG test bed

    NASA Astrophysics Data System (ADS)

    Mosby, Gregory; Rauscher, Bernard; Kutyrev, Alexander

    2018-01-01

    Chemical species associated with life, called biosignatures, should be visible in exoplanet atmospheres with larger space telescopes. These signals will be faint and require very low noise (~e-) detectors to robustly measure. At NASA Goddard we are developing a single detector H4RG test bed to characterize and identify potential technology developments needed for the next generation's large space telescopes. The vacuum and cryogenic test bed will include near infrared light sources from integrating spheres using a motorized shutter. The detector control and readout will be handled by a Leach controller. Detector cables have been manufactured and test planning has begun. Planned tests include testing minimum read noise capabilities, persistence mitigation strategies using long wavelength light, and measuring intrapixel variation which might affect science goals of future missions. In addition to providing a means to identify areas of improvement in detector technology, we hope to use this test bed to probe some fundamental physics of these infrared arrays.

  16. USL/DBMS NASA/PC R and D project system testing standards

    NASA Technical Reports Server (NTRS)

    Dominick, Wayne D. (Editor); Kavi, Srinu; Moreau, Dennis R.; Yan, Lin

    1984-01-01

    A set of system testing standards to be used in the development of all C software within the NASA/PC Research and Development Project is established. Testing will be considered in two phases: the program testing phase and the system testing phase. The objective of these standards is to provide guidelines for the planning and conduct of program and software system testing.

  17. Development and Field Testing of the FootFall Planning System for the ATHLETE Robots

    NASA Technical Reports Server (NTRS)

    SunSpiral, Vytas; Wheeler, D. W.; Chavez-Clementa, Daniel; Mittman, David

    2011-01-01

    The FootFall Planning System is a ground-based planning and decision support system designed to facilitate the control of walking activities for the ATHLETE (All-Terrain Hex-Limbed Extra-Terrestrial Explorer) family of robots. ATHLETE was developed at NASA's Jet Propulsion Laboratory (JPL) and is a large six-legged robot designed to serve multiple roles during manned and unmanned missions to the Moon; its roles include transportation, construction and exploration. Over the four years from 2006 through 2010 the FootFall Planning System was developed and adapted to two generations of the ATHLETE robots and tested at two analog field sites (the Human Robotic Systems Project's Integrated Field Test at Moses Lake, Washington, June 2008, and the Desert Research and Technology Studies (D-RATS), held at Black Point Lava Flow in Arizona, September 2010). Having 42 degrees of kinematic freedom, standing to a maximum height of just over 4 meters, and having a payload capacity of 450 kg in Earth gravity, the current version of the ATHLETE robot is a uniquely complex system. A central challenge to this work was the compliance of the high-DOF (Degree Of Freedom) robot, especially the compliance of the wheels, which affected many aspects of statically-stable walking. This paper will review the history of the development of the FootFall system, sharing design decisions, field test experiences, and the lessons learned concerning compliance and self-awareness.

  18. Strategic Planning in a Government Organization: The Experience of the Technical Information Division at NRaD.

    ERIC Educational Resources Information Center

    Cathcart, Margaret E.

    1997-01-01

    Describes development of strategic objectives at the Research, Development, Test, and Evaluation Division of the Naval Command, Control and Ocean Surveillance Center (NRaD). Discusses its plan to achieve these objectives. States that the organization's responsibilities span the continuum of information using technical communication skills. Uses…

  19. Post-test navigation data analysis techniques for the shuttle ALT

    NASA Technical Reports Server (NTRS)

    1975-01-01

    Postflight test analysis data processing techniques for shuttle approach and landing tests (ALT) navigation data are defined. Postfight test processor requirements are described along with operational and design requirements, data input requirements, and software test requirements. The postflight test data processing is described based on the natural test sequence: quick-look analysis, postflight navigation processing, and error isolation processing. Emphasis is placed on the tradeoffs that must remain open and subject to analysis until final definition is achieved in the shuttle data processing system and the overall ALT plan. A development plan for the implementation of the ALT postflight test navigation data processing system is presented. Conclusions are presented.

  20. Science, policy, and stakeholders: developing a consensus science plan for Amchitka Island, Aleutians, Alaska.

    PubMed

    Burger, Joanna; Gochfeld, Michael; Kosson, David S; Powers, Charles W; Friedlander, Barry; Eichelberger, John; Barnes, David; Duffy, Lawrence K; Jewett, Stephen C; Volz, Conrad D

    2005-05-01

    With the ending of the Cold War, the US Department of Energy is responsible for the remediation of radioactive waste and disposal of land no longer needed for nuclear material production or related national security missions. The task of characterizing the hazards and risks from radionuclides is necessary for assuring the protection of health of humans and the environment. This is a particularly daunting task for those sites that had underground testing of nuclear weapons, where the radioactive contamination is currently inaccessible. Herein we report on the development of a Science Plan to characterize the physical and biological marine environment around Amchitka Island in the Aleutian chain of Alaska, where three underground nuclear tests were conducted (1965-1971). Information on the ecology, geology, and current radionuclide levels in biota, water, and sediment is necessary for evaluating possible current contamination and to serve as a baseline for developing a plan to ensure human and ecosystem health in perpetuity. Other information required includes identifying the location of the salt water/fresh water interface where migration to the ocean might occur in the future and determining groundwater recharge balances, as well as assessing other physical/geological features of Amchitka near the test sites. The Science Plan is needed to address the confusing and conflicting information available to the public about radionuclide risks from underground nuclear blasts in the late 1960s and early 1970s, as well as the potential for volcanic or seismic activity to disrupt shot cavities or accelerate migration of radionuclides into the sea. Developing a Science Plan involved agreement among regulators and other stakeholders, assignment of the task to the Consortium for Risk Evaluation with Stakeholder Participation, and development of a consensus Science Plan that dealt with contentious scientific issues. Involvement of the regulators (State of Alaska), resource trustees (U S Fish and Wildlife Service), representatives of the Aleut and Pribilof Island communities, and other stakeholders was essential for plan development and approval, although this created tensions because of the different objectives of each group. The complicated process of developing a Science Plan involved iterations and interactions with multiple agencies and organizations, scientists in several disciplines, regulators, and the participation of Aleut people in their home communities, as well as the general public. The importance of including all parties in all phases of the development of the Science Plan was critical to its acceptance by a broad range of regulators, agencies, resource trustees, Aleutian/Pribilof communities, and other stakeholders.

  1. Planning and executing complex large-scale exercises.

    PubMed

    McCormick, Lisa C; Hites, Lisle; Wakelee, Jessica F; Rucks, Andrew C; Ginter, Peter M

    2014-01-01

    Increasingly, public health departments are designing and engaging in complex operations-based full-scale exercises to test multiple public health preparedness response functions. The Department of Homeland Security's Homeland Security Exercise and Evaluation Program (HSEEP) supplies benchmark guidelines that provide a framework for both the design and the evaluation of drills and exercises; however, the HSEEP framework does not seem to have been designed to manage the development and evaluation of multiple, operations-based, parallel exercises combined into 1 complex large-scale event. Lessons learned from the planning of the Mississippi State Department of Health Emergency Support Function--8 involvement in National Level Exercise 2011 were used to develop an expanded exercise planning model that is HSEEP compliant but accounts for increased exercise complexity and is more functional for public health. The Expanded HSEEP (E-HSEEP) model was developed through changes in the HSEEP exercise planning process in areas of Exercise Plan, Controller/Evaluator Handbook, Evaluation Plan, and After Action Report and Improvement Plan development. The E-HSEEP model was tested and refined during the planning and evaluation of Mississippi's State-level Emergency Support Function-8 exercises in 2012 and 2013. As a result of using the E-HSEEP model, Mississippi State Department of Health was able to capture strengths, lessons learned, and areas for improvement, and identify microlevel issues that may have been missed using the traditional HSEEP framework. The South Central Preparedness and Emergency Response Learning Center is working to create an Excel-based E-HSEEP tool that will allow practice partners to build a database to track corrective actions and conduct many different types of analyses and comparisons.

  2. Maglev program test plan. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    deBenedet, D.; Gilchrist, A.J.; Karanian, L.A.

    1992-07-01

    Maglev systems represent a promising evolution in the high-speed ground transportation, offering speeds in excess of 300 mph along with the potential for low operating costs and minimal environmental impact. The goal of this effort is to investigate the feasibility and viability of maglev systems in the United States. The emergence of a sophisticated technology such as maglev requires a need for a coordinated research test program and the determination of test requirements to identify and mitigate development risk and to maximize the use of domestic resources. The study is directed toward the identification and characterization of maglev systems developmentmore » risks tied to a preliminary system architecture. Research objectives are accomplished by surveying experiences from previous maglev development programs, both foreign and domestic, and interviews with individuals involved with maglev research and testing. Findings include ninety-four distinct development risks and twenty risk types. Planning and implementation requirements are identified for a maglev test program, including the development of a facilities strategy to meet any operational concepts that evolve out of early development effort. Also specified is the logical development flow and associated long-lead support needs for sub-scale and full-scale testing.« less

  3. Strategic planning for the International Space Station

    NASA Technical Reports Server (NTRS)

    Griner, Carolyn S.

    1990-01-01

    The concept for utilization and operations planning for the International Space Station Freedom was developed in a NASA Space Station Operations Task Force in 1986. Since that time the concept has been further refined to definitize the process and products required to integrate the needs of the international user community with the operational capabilities of the Station in its evolving configuration. The keystone to the process is the development of individual plans by the partners, with the parameters and formats common to the degree that electronic communications techniques can be effectively utilized, while maintaining the proper level and location of configuration control. The integration, evaluation, and verification of the integrated plan, called the Consolidated Operations and Utilization Plan (COUP), is being tested in a multilateral environment to prove out the parameters, interfaces, and process details necessary to produce the first COUP for Space Station in 1991. This paper will describe the concept, process, and the status of the multilateral test case.

  4. Development of an Experiment High Performance Nozzle Research Program

    NASA Technical Reports Server (NTRS)

    2004-01-01

    As proposed in the above OAI/NASA Glenn Research Center (GRC) Co-Operative Agreement the objective of the work was to provide consultation and assistance to the NASA GRC GTX Rocket Based Combined Cycle (RBCC) Program Team in planning and developing requirements, scale model concepts, and plans for an experimental nozzle research program. The GTX was one of the launch vehicle concepts being studied as a possible future replacement for the aging NASA Space Shuttle, and was one RBCC element in the ongoing NASA Access to Space R&D Program (Reference 1). The ultimate program objective was the development of an appropriate experimental research program to evaluate and validate proposed nozzle concepts, and thereby result in the optimization of a high performance nozzle for the GTX launch vehicle. Included in this task were the identification of appropriate existing test facilities, development of requirements for new non-existent test rigs and fixtures, develop scale nozzle model concepts, and propose corresponding test plans. Also included were the evaluation of originally proposed and alternate nozzle designs (in-house and contractor), evaluation of Computational Fluid Dynamics (CFD) study results, and make recommendations for geometric changes to result in improved nozzle thrust coefficient performance (Cfg).

  5. Using a Staff Needs Planning System To Increase Organization, To Increase Quality of Client Services, and To Reduce Overtime.

    ERIC Educational Resources Information Center

    Stang, David

    A staff-needs planning system was developed and tested in a Department of Social Services' Family and Children's Services Unit in a medium-sized county where caseworkers used no established strategy or planning method to facilitate accomplishment of all the job requirements. The goal of the study was to implement a planning system based on each…

  6. Commissioning and quality assurance for VMAT delivery systems: An efficient time-resolved system using real-time EPID imaging.

    PubMed

    Zwan, Benjamin J; Barnes, Michael P; Hindmarsh, Jonathan; Lim, Seng B; Lovelock, Dale M; Fuangrod, Todsaporn; O'Connor, Daryl J; Keall, Paul J; Greer, Peter B

    2017-08-01

    An ideal commissioning and quality assurance (QA) program for Volumetric Modulated Arc Therapy (VMAT) delivery systems should assess the performance of each individual dynamic component as a function of gantry angle. Procedures within such a program should also be time-efficient, independent of the delivery system and be sensitive to all types of errors. The purpose of this work is to develop a system for automated time-resolved commissioning and QA of VMAT control systems which meets these criteria. The procedures developed within this work rely solely on images obtained, using an electronic portal imaging device (EPID) without the presence of a phantom. During the delivery of specially designed VMAT test plans, EPID frames were acquired at 9.5 Hz, using a frame grabber. The set of test plans was developed to individually assess the performance of the dose delivery and multileaf collimator (MLC) control systems under varying levels of delivery complexities. An in-house software tool was developed to automatically extract features from the EPID images and evaluate the following characteristics as a function of gantry angle: dose delivery accuracy, dose rate constancy, beam profile constancy, gantry speed constancy, dynamic MLC positioning accuracy, MLC speed and acceleration constancy, and synchronization between gantry angle, MLC positioning and dose rate. Machine log files were also acquired during each delivery and subsequently compared to information extracted from EPID image frames. The largest difference between measured and planned dose at any gantry angle was 0.8% which correlated with rapid changes in dose rate and gantry speed. For all other test plans, the dose delivered was within 0.25% of the planned dose for all gantry angles. Profile constancy was not found to vary with gantry angle for tests where gantry speed and dose rate were constant, however, for tests with varying dose rate and gantry speed, segments with lower dose rate and higher gantry speed exhibited less profile stability. MLC positional accuracy was not observed to be dependent on the degree of interdigitation. MLC speed was measured for each individual leaf and slower leaf speeds were shown to be compensated for by lower dose rates. The test procedures were found to be sensitive to 1 mm systematic MLC errors, 1 mm random MLC errors, 0.4 mm MLC gap errors and synchronization errors between the MLC, dose rate and gantry angle controls systems of 1°. In general, parameters measured by both EPID and log files agreed with the plan, however, a greater average departure from the plan was evidenced by the EPID measurements. QA test plans and analysis methods have been developed to assess the performance of each dynamic component of VMAT deliveries individually and as a function of gantry angle. This methodology relies solely on time-resolved EPID imaging without the presence of a phantom and has been shown to be sensitive to a range of delivery errors. The procedures developed in this work are both comprehensive and time-efficient and can be used for streamlined commissioning and QA of VMAT delivery systems. © 2017 American Association of Physicists in Medicine.

  7. Ground Systems Development Environment (GSDE) software configuration management

    NASA Technical Reports Server (NTRS)

    Church, Victor E.; Long, D.; Hartenstein, Ray; Perez-Davila, Alfredo

    1992-01-01

    This report presents a review of the software configuration management (CM) plans developed for the Space Station Training Facility (SSTF) and the Space Station Control Center. The scope of the CM assessed in this report is the Systems Integration and Testing Phase of the Ground Systems development life cycle. This is the period following coding and unit test and preceding delivery to operational use. This report is one of a series from a study of the interfaces among the Ground Systems Development Environment (GSDE), the development systems for the SSTF and the SSCC, and the target systems for SSCC and SSTF. This is the last report in the series. The focus of this report is on the CM plans developed by the contractors for the Mission Systems Contract (MSC) and the Training Systems Contract (TSC). CM requirements are summarized and described in terms of operational software development. The software workflows proposed in the TSC and MSC plans are reviewed in this context, and evaluated against the CM requirements defined in earlier study reports. Recommendations are made to improve the effectiveness of CM while minimizing its impact on the developers.

  8. Manpower Planning for Municipal Wastewater Treatment in Texas, LP-8.

    ERIC Educational Resources Information Center

    Texas State Dept. of Water Resources, Austin.

    This report presents the implementation results of a pilot test of a manpower planning methodology developed by the U.S. Environmental Protection Agency (EPA), Office of Water Programs. Project outputs and projections are described and illustrated in sections of the report dealing with work to be done, organizational staffing plan, transfers and…

  9. A Navy Shore Activity Manpower Planning System for Civilians. Technical Report No. 24.

    ERIC Educational Resources Information Center

    Niehaus, R. J.; Sholtz, D.

    This report describes the U.S. Navy Shore Activity Manpower Planning System (SAMPS) advanced development research project. This effort is aimed at large-scale feasibility tests of manpower models for large Naval installations. These local planning systems are integrated with Navy-wide information systems on a data-communications network accessible…

  10. Radiated Emissions Test Approach

    DOT National Transportation Integrated Search

    2015-10-02

    1. Draft Department of Transportation (DOT) Test Plan to Develop : Interference Tolerance Masks for GNSS Receivers in the L1 : Radiofrequency Band (1559 1610 MHz) provides high level : overview of radiated emissions test setup : 2. Presenta...

  11. A Case Study: Testing in the Albuquerque Public Schools.

    ERIC Educational Resources Information Center

    Robinson, Carol

    1983-01-01

    This case study of testing in the Albuquerque public schools highlights improvement of test results dissemination and use through cooperative planning, integrated database development, and a partnership with public media. (Author)

  12. New developments in Seafloor observatory technologies: the SED Module developed in the MONSOON project

    NASA Astrophysics Data System (ADS)

    Italiano, Francesco; Caruso, Cinzia; Corbo, Andrea; Lazzaro, Gianluca; Nigrelli, Alessandra; Sprovieri, Mario; Oliveri, Elvira; Bagnato, Emanuela; Favali, Paolo

    2015-04-01

    In the main frame of the wide range of scientific and technological activities developed by EMSO (European Multidisciplinary Seafloor and water-column Observatory, www.emso-eu.org) Research Infrastructure. The MONSOON project (MONitoraggio SOttOmariNo for environmental and energetic purposes) is a FESR (i.e. European funds for social development) funded project by "Regione Siciliana" (industrial call). The final target of the project is to build up a prototype of a seafloor observatory named SED (Submarine Energy Device),.for which specific technological developments in terms of power consumption reduction, new data logger and new sensors have been planned. The SED observatory is planned to operate down to a water depth of 2000m in an extreme marine environment, with the presence of hydrothermal vents. SED is designed to operate as "stand-alone" or near-real-time observatory when connected to a buoy. The final version of the prototype it is planned to be released in June-July 2015 after tests completion. All the components of the observatory have been planned and laboratory-tested by the INGV and CNR public Research Institutions, while the executive plan and the manufacturing has been carried out by the industrial partnership (Eurobuilding SpA, Hitec2000 srl and Innova SpA). All the partners are going to take care of the tests in a real environment. The selected test site is located in the Aeolian islands where the shallow hydrothermal system off the coasts of the Panarea island provided an easy-to access extreme submarine environment with temperatures up to 140°C, pH less than 3 and electrical conductivity double of the normal sea-water. In this hostile environment we tested all the materials planned to be used to manufacture the different parts of the observatory, as well as all the sensors including those off-the-shelf and those planned within the MONSOON project: probes for acoustic signals, dissolved CO2 data, optical fibre-based temperature and pressure The probes are connected by submarine cables and connectors to a vessel hosting the electronics made new low-power cards for data collection, electrical power management, sensor driving and control, network communication and data storage. The power is provided by high capacity Lithium-polymer batteries. The tests have been carried out using a permanent INGV infrastructure made of a buoy cabled to a seafloor station operating at a depth of 23 metres two miles to the East of the Panarea island. This infrastructure allowed to perform the communication tests and to check the status of all the probes by near-real time communication. The technologies developed within the MONSOON project support the EMSO scientific infrastructure, allow to perform continuous monitoring in marine hydrothermal systems and exploit the know-how on the scientific and industrial international market.

  13. Designs and adaptive analysis plans for pivotal clinical trials of therapeutics and companion diagnostics.

    PubMed

    Simon, Richard

    2008-06-01

    Developments in genomics and biotechnology provide unprecedented opportunities for the development of effective therapeutics and companion diagnostics for matching the right drug to the right patient. Effective co-development involves many new challenges with increased opportunity for success as well as delay and failure. Clinical trial designs and adaptive analysis plans for the prospective design of pivotal trials of new therapeutics and companion diagnostics are reviewed. Effective co-development requires careful prospective planning of the design and analysis strategy for pivotal clinical trials. Randomized clinical trials continue to be important for evaluating the effectiveness of new treatments, but the target populations for analysis should be prospectively specified based on the companion diagnostic. Post hoc analyses of traditionally designed randomized clinical trials are often deeply problematic. Clear separation is generally required of the data used for developing the diagnostic test, including their threshold of positivity, from the data used for evaluating treatment effectiveness in subsets determined by the test. Adaptive analysis can be used to provide flexibility to the analysis but the use of such methods requires careful planning and prospective definition in order to assure that the pivotal trial adequately limits the chance of erroneous conclusions.

  14. Anonymization of DICOM Electronic Medical Records for Radiation Therapy

    PubMed Central

    Newhauser, Wayne; Jones, Timothy; Swerdloff, Stuart; Newhauser, Warren; Cilia, Mark; Carver, Robert; Halloran, Andy; Zhang, Rui

    2014-01-01

    Electronic medical records (EMR) and treatment plans are used in research on patient outcomes and radiation effects. In many situations researchers must remove protected health information (PHI) from EMRs. The literature contains several studies describing the anonymization of generic Digital Imaging and Communication in Medicine (DICOM) files and DICOM image sets but no publications were found that discuss the anonymization of DICOM radiation therapy plans, a key component of an EMR in a cancer clinic. In addition to this we were unable to find a commercial software tool that met the minimum requirements for anonymization and preservation of data integrity for radiation therapy research. The purpose of this study was to develop a prototype software code to meet the requirements for the anonymization of radiation therapy treatment plans and to develop a way to validate that code and demonstrate that it properly anonymized treatment plans and preserved data integrity. We extended an open-source code to process all relevant PHI and to allow for the automatic anonymization of multiple EMRs. The prototype code successfully anonymized multiple treatment plans in less than 1 minute per patient. We also tested commercial optical character recognition (OCR) algorithms for the detection of burned-in text on the images, but they were unable to reliably recognize text. In addition, we developed and tested an image filtering algorithm that allowed us to isolate and redact alpha-numeric text from a test radiograph. Validation tests verified that PHI was anonymized and data integrity, such as the relationship between DICOM unique identifiers (UID) was preserved. PMID:25147130

  15. Anonymization of DICOM electronic medical records for radiation therapy.

    PubMed

    Newhauser, Wayne; Jones, Timothy; Swerdloff, Stuart; Newhauser, Warren; Cilia, Mark; Carver, Robert; Halloran, Andy; Zhang, Rui

    2014-10-01

    Electronic medical records (EMR) and treatment plans are used in research on patient outcomes and radiation effects. In many situations researchers must remove protected health information (PHI) from EMRs. The literature contains several studies describing the anonymization of generic Digital Imaging and Communication in Medicine (DICOM) files and DICOM image sets but no publications were found that discuss the anonymization of DICOM radiation therapy plans, a key component of an EMR in a cancer clinic. In addition to this we were unable to find a commercial software tool that met the minimum requirements for anonymization and preservation of data integrity for radiation therapy research. The purpose of this study was to develop a prototype software code to meet the requirements for the anonymization of radiation therapy treatment plans and to develop a way to validate that code and demonstrate that it properly anonymized treatment plans and preserved data integrity. We extended an open-source code to process all relevant PHI and to allow for the automatic anonymization of multiple EMRs. The prototype code successfully anonymized multiple treatment plans in less than 1min/patient. We also tested commercial optical character recognition (OCR) algorithms for the detection of burned-in text on the images, but they were unable to reliably recognize text. In addition, we developed and tested an image filtering algorithm that allowed us to isolate and redact alpha-numeric text from a test radiograph. Validation tests verified that PHI was anonymized and data integrity, such as the relationship between DICOM unique identifiers (UID) was preserved. Copyright © 2014 Elsevier Ltd. All rights reserved.

  16. ENVIRONMENTAL TECHNOLOGY VERIFICATION REPORT; RECHARGEABLE ALKALINE HOUSEHOLD BATTERY SYSTEM; RAYOVAC CORPORATION, RENEWAL

    EPA Science Inventory

    The EPA's ETV Program, in partnership with recognized testing organizations, objectively and systematically documents the performance of commercial ready technologies. Together, with the full participation of the technology developer, develop plans, conduct tests, collect and ana...

  17. Challenges and Opportunities for an ITS Intermodal Freight Program

    DOT National Transportation Integrated Search

    1999-02-01

    This final report was developed as part of the project, "ITS/Intermodal Freight Design for Operational Tests." The objective of the project was to develop a plan for conducting field operational tests to facilitate movement of intermodal freight in t...

  18. Challenges And Opportunities For An ITS/Intermodal Freight Program

    DOT National Transportation Integrated Search

    1999-02-01

    This final report was developed as part of the project, "ITS/Intermodal Freight Design for Operational Tests". The objective of the project was to develop a plan for conducting field operational tests to facilitate movement of intermodal freight in t...

  19. Two for one: a self-management plan coupled with a prescription sheet for children with asthma.

    PubMed

    Ducharme, Francine M; Noya, Francisco; McGillivray, David; Resendes, Sandy; Ducharme-Bénard, Stéphanie; Zemek, Roger; Bhogal, Sanjit Kaur; Rouleau, Rachel

    2008-10-01

    Despite strong recommendations in the asthma guidelines, the use of written self-management plans remains low among asthmatic patients. To develop a written self-management plan, based on scientific evidence and expert opinions, in a format intended to facilitate its dispensing by health care professionals, and to test the perception of its relevance and clarity by asthmatic children, adolescents and adults. Inspired by previously tested self-management plans, surveys of asthma educators, expert opinions and the 2004 Canadian Asthma Guidelines, the authors simultaneously developed French and English versions of a written self-management plan that coupled with a prescription. The self-management plan was tested in parents and their asthmatic children (aged one to 17 years), and it was revised until 85% clarity and perceived relevance was achieved. Ninety-seven children and their parents were interviewed. Twenty per cent had a self-management plan. On the final revision, nearly all items were clear and perceived relevant by 85% or more of the interviewees. Two self-management plans were designed for clinics and acute care settings, respectively. The plans are divided into three control zones identified by symptoms with optional peak flow values and symbolized by traffic light colours. They are designed in triplicate format with a prescription slip, a medical chart copy and a patient copy. The written self-management plans, based on available scientific evidence and expert opinions, are clear and perceived to be relevant by children, adolescents and their parents. By incorporating the prescription and chart copies, they were designed to facilitate dispensing by physicians in both clinics and acute care settings.

  20. Implementation of the Large-Scale Operations Management Test in the State of Washington.

    DTIC Science & Technology

    1982-12-01

    During FY 79, the U.S. Army Engineer Waterways Experiment Station (WES), Vicksburg, Miss., completed the first phase of its 3-year Large-Scale Operations Management Test (LSOMT). The LSOMT was designed to develop an operational plan to identify methodologies that can be implemented by the U.S. Army Engineer District, Seattle (NPS), to prevent the exotic aquatic macrophyte Eurasian watermilfoil (Myrophyllum spicatum L.) from reaching problem-level proportions in water bodies in the state of Washington. The WES developed specific plans as integral elements

  1. Yield Model Development (YMD) implementation plan for fiscal years 1981 and 1982

    NASA Technical Reports Server (NTRS)

    Ambroziak, R. A. (Principal Investigator)

    1981-01-01

    A plan is described for supporting USDA crop production forecasting and estimation by (1) testing, evaluating, and selecting crop yield models for application testing; (2) identifying areas of feasible research for improvement of models; and (3) conducting research to modify existing models and to develop new crop yield assessment methods. Tasks to be performed for each of these efforts are described as well as for project management and support. The responsibilities of USDA, USDC, USDI, and NASA are delineated as well as problem areas to be addressed.

  2. Conceptual definition of a technology development mission for advanced solar dynamic power systems

    NASA Technical Reports Server (NTRS)

    Migra, R. P.

    1986-01-01

    An initial conceptual definition of a technology development mission for advanced solar dynamic power systems is provided, utilizing a space station to provide a dedicated test facility. The advanced power systems considered included Brayton, Stirling, and liquid metal Rankine systems operating in the temperature range of 1040 to 1400 K. The critical technologies for advanced systems were identified by reviewing the current state of the art of solar dynamic power systems. The experimental requirements were determined by planning a system test of a 20 kWe solar dynamic power system on the space station test facility. These requirements were documented via the Mission Requirements Working Group (MRWG) and Technology Development Advocacy Group (TDAG) forms. Various concepts or considerations of advanced concepts are discussed. A preliminary evolutionary plan for this technology development mission was prepared.

  3. Feasibility study of a pressure-fed engine for a water recoverable space shuttle booster. Volume 3, part 1: Program acquisition planning

    NASA Technical Reports Server (NTRS)

    Olsen, C. D.

    1972-01-01

    Planning documentation is presented covering the specific areas of project engineering and development, management, facilities, manufacturing, logistic support maintenance, and test and product assurance.

  4. Planning fuel-conservative descents in an airline environmental using a small programmable calculator: Algorithm development and flight test results

    NASA Technical Reports Server (NTRS)

    Knox, C. E.; Vicroy, D. D.; Simmon, D. A.

    1985-01-01

    A simple, airborne, flight-management descent algorithm was developed and programmed into a small programmable calculator. The algorithm may be operated in either a time mode or speed mode. The time mode was designed to aid the pilot in planning and executing a fuel-conservative descent to arrive at a metering fix at a time designated by the air traffic control system. The speed model was designed for planning fuel-conservative descents when time is not a consideration. The descent path for both modes was calculated for a constant with considerations given for the descent Mach/airspeed schedule, gross weight, wind, wind gradient, and nonstandard temperature effects. Flight tests, using the algorithm on the programmable calculator, showed that the open-loop guidance could be useful to airline flight crews for planning and executing fuel-conservative descents.

  5. Planning fuel-conservative descents in an airline environmental using a small programmable calculator: algorithm development and flight test results

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Knox, C.E.; Vicroy, D.D.; Simmon, D.A.

    A simple, airborne, flight-management descent algorithm was developed and programmed into a small programmable calculator. The algorithm may be operated in either a time mode or speed mode. The time mode was designed to aid the pilot in planning and executing a fuel-conservative descent to arrive at a metering fix at a time designated by the air traffic control system. The speed model was designed for planning fuel-conservative descents when time is not a consideration. The descent path for both modes was calculated for a constant with considerations given for the descent Mach/airspeed schedule, gross weight, wind, wind gradient, andmore » nonstandard temperature effects. Flight tests, using the algorithm on the programmable calculator, showed that the open-loop guidance could be useful to airline flight crews for planning and executing fuel-conservative descents.« less

  6. Planning abilities of children aged 4 years and 9 months to 8 ½ years: Effects of age, fluid intelligence and school type on performance in the Tower of London test

    PubMed Central

    Malloy-Diniz, Leandro Fernandes; Cardoso-Martins, Cláudia; Nassif, Elaine Pacheco; Levy, Angela Maria; Leite, Wellington Borges; Fuentes, Daniel

    2008-01-01

    The present study investigated the relationship between age and one type of environmental factor, namely, type of school (i.e., private vs. public), and the development of mental planning ability, as measured by the Tower of London (TOL) test. Methods Participants comprised 197 public and 174 private school students, ranging in age from 4 years and 9 months to 8 years and 6 months. Besides the TOL test, students were administered Raven's Colored Matrices. Results Results confirmed the findings of previous studies that both age and school type are important predictors of mental planning. Furthermore, results also suggest that the relationship between type of school and mental planning ability cannot be accounted for by differences in students' fluid intelligence. Conclusion In the present study, the TOL test continued to differentiate public from private school students, even after we controlled for the effect of differences on the Raven test. PMID:29213536

  7. Expected genetic gains and development plans for two longlead pine third-generation seedling seed orchards

    Treesearch

    C.D. Nelson; L.H. Lott; D.P. Gwaze

    2005-01-01

    Selection and thinning plans were developed for two longleaf pine (Pinus palushis Mill .), third-generation seedling seed orchards located in southeastern Mississippi and central Louisiana. The two orchards were part of several long-term experimental field tests designed to investigate genetic variation in height growth and brown spot needle blight (...

  8. Plans for crash-tested bridge railings for longitudinal wood decks on low-volume roads

    Treesearch

    Michael A. Ritter; Ronald K. Faller; Steve Bunnell; Paula D. Hilbrich Lee; Barry T. Rosson

    1998-01-01

    The plans for crashworthy bridge railings for low-volume roads were developed through a cooperative research program involving the USDA Forest Service, Forest Products Laboratory (FPL); the Midwest Roadside Safety Facility, University of Nebraska-Lincoln (MwRSF); and the Forest Service, National Forest System, Engineering. Three railings were developed and successfully...

  9. The systematic development of ROsafe: an intervention to promote STI testing among vocational school students.

    PubMed

    Wolfers, Mireille; de Zwart, Onno; Kok, Gerjo

    2012-05-01

    This article describes the development of ROsafe, an intervention to promote sexually transmitted infection (STI) testing at vocational schools in the Netherlands. Using the planning model of intervention mapping (IM), an educational intervention was designed that consisted of two lessons, an Internet site, and sexual health services at the school sites. IM is a stepwise approach for theory- and evidence-based development and implementation of interventions. It includes six steps: needs assessment, specification of the objectives in matrices, selection of theoretical methods and practical strategies, program design, implementation planning, and evaluation. The processes and outcomes that are performed during Steps 1 to 4 of IM are presented, that is, literature review and qualitative and quantitative research in needs assessment, leading to the definition of the desired behavioral outcomes and objectives. The matrix of change objectives for STI-testing behavior is presented, and then the development of theory into program is described, using examples from the program. Finally, the planning for implementation and evaluation is discussed. The educational intervention used methods that were derived from the social cognitive theory, the elaboration likelihood model, the persuasive communication matrix, and theories about risk communication. Strategies included short movies, discussion, knowledge quiz, and an interactive behavioral self-test through the Internet.

  10. Development of a verification program for deployable truss advanced technology

    NASA Technical Reports Server (NTRS)

    Dyer, Jack E.

    1988-01-01

    Use of large deployable space structures to satisfy the growth demands of space systems is contingent upon reducing the associated risks that pervade many related technical disciplines. The overall objectives of this program was to develop a detailed plan to verify deployable truss advanced technology applicable to future large space structures and to develop a preliminary design of a deployable truss reflector/beam structure for use a a technology demonstration test article. The planning is based on a Shuttle flight experiment program using deployable 5 and 15 meter aperture tetrahedral truss reflections and a 20 m long deployable truss beam structure. The plan addresses validation of analytical methods, the degree to which ground testing adequately simulates flight and in-space testing requirements for large precision antenna designs. Based on an assessment of future NASA and DOD space system requirements, the program was developed to verify four critical technology areas: deployment, shape accuracy and control, pointing and alignment, and articulation and maneuvers. The flight experiment technology verification objectives can be met using two shuttle flights with the total experiment integrated on a single Shuttle Test Experiment Platform (STEP) and a Mission Peculiar Experiment Support Structure (MPESS). First flight of the experiment can be achieved 60 months after go-ahead with a total program duration of 90 months.

  11. The Madison Plan: A New Approach to System-Wide Testing. The Nucleus Testing Committee.

    ERIC Educational Resources Information Center

    Cleary, T. Anne; Mathews, Walter M.

    Steps in the development of a Nucleus Testing Committee to assist in the development of a system-wide testing program in the Madison, Wisconsin, school system are described. Over 60 participants were selected for the committee, using the following selection guidelines: interest in the project and the role to be assumed, commitment to the school…

  12. Development of Low $$\\beta $$ Single-Spoke Resonators for the Front End of the Proton Improvement Plan-II at Fermilab

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Awida, Mohamed H.; Passarelli, Donato; Berrutti, Paolo

    A total of ten jacketed single-spoke resonators type 1 (SSR1) have been fabricated for Fermilab' injection experiment (PIP2IT). PIP2IT is a test bed for Fermilab's future accelerator named proton improvement plan II that is currently under development. SSR1 cavities operate at 325 MHz to accelerate a proton beam at a relative (to speed of light) velocity (β = 0.22). In this study, we present Fermilab's experience in developing those spoke resonators starting from the design and analysis phase, to fabrication and extensive testing to qualify cavities for cryomodule assembly.

  13. Development of Low $$\\beta $$ Single-Spoke Resonators for the Front End of the Proton Improvement Plan-II at Fermilab

    DOE PAGES

    Awida, Mohamed H.; Passarelli, Donato; Berrutti, Paolo; ...

    2017-08-18

    A total of ten jacketed single-spoke resonators type 1 (SSR1) have been fabricated for Fermilab' injection experiment (PIP2IT). PIP2IT is a test bed for Fermilab's future accelerator named proton improvement plan II that is currently under development. SSR1 cavities operate at 325 MHz to accelerate a proton beam at a relative (to speed of light) velocity (β = 0.22). In this study, we present Fermilab's experience in developing those spoke resonators starting from the design and analysis phase, to fabrication and extensive testing to qualify cavities for cryomodule assembly.

  14. Development of robotics facility docking test hardware

    NASA Technical Reports Server (NTRS)

    Loughead, T. E.; Winkler, R. V.

    1984-01-01

    Design and fabricate test hardware for NASA's George C. Marshall Space Flight Center (MSFC) are reported. A docking device conceptually developed was fabricated, and two docking targets which provide high and low mass docking loads were required and were represented by an aft 61.0 cm section of a Hubble space telescope (ST) mockup and an upgrading of an existing multimission modular spacecraft (MSS) mockup respectively. A test plan is developed for testing the hardware.

  15. Overseas testing of a multisensor landmine detection system: results and lessons learned

    NASA Astrophysics Data System (ADS)

    Keranen, Joe G.; Topolosky, Zeke

    2009-05-01

    The Nemesis detection system has been developed to provide an efficient and reliable unmanned, multi-sensor, groundbased platform to detect and mark landmines. The detection system consists of two detection sensor arrays: a Ground Penetrating Synthetic Aperture Radar (GPSAR) developed by Planning Systems, Inc. (PSI) and an electromagnetic induction (EMI) sensor array developed by Minelab Electronics, PTY. Limited. Under direction of the Night Vision and Electronic Sensors Directorate (NVESD), overseas testing was performed at Kampong Chhnang Test Center (KCTC), Cambodia, from May 12-30, 2008. Test objectives included: evaluation of detection performance, demonstration of real-time visualization and alarm generation, and evaluation of system operational efficiency. Testing was performed on five sensor test lanes, each consisting of a unique soil mixture and three off-road lanes which include curves, overgrowth, potholes, and non-uniform lane geometry. In this paper, we outline the test objectives, procedures, results, and lessons learned from overseas testing. We also describe the current state of the system, and plans for future enhancements and modifications including clutter rejection and feature-level fusion.

  16. Commercial Skills Test Information Management System final report and self-sustainability plan : [technology brief].

    DOT National Transportation Integrated Search

    2014-04-01

    The Commercial Skills Test Information Management System (CSTIMS) was developed to address the fraudulent issuance of commercial drivers licenses (CDLs) across the United States. CSTIMS was developed as a Web-based, software-as-a-service system to...

  17. Overview of an Advanced Hypersonic Structural Concept Test Program

    NASA Technical Reports Server (NTRS)

    Stephens, Craig A.; Hudson, Larry D.; Piazza, Anthony

    2007-01-01

    This viewgraph presentation provides an overview of hypersonics M&S advanced structural concepts development and experimental methods. The discussion on concepts development includes the background, task objectives, test plan, and current status of the C/SiC Ruddervator Subcomponent Test Article (RSTA). The discussion of experimental methods examines instrumentation needs, sensors of interest, and examples of ongoing efforts in the development of extreme environment sensors.

  18. SU-E-T-109: Development of An End-To-End Test for the Varian TrueBeamtm with a Novel Multiple-Dosimetric Modality H and N Phantom

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zakjevskii, V; Knill, C; Rakowski, J

    2014-06-01

    Purpose: To develop a comprehensive end-to-end test for Varian's TrueBeam linear accelerator for head and neck IMRT using a custom phantom designed to utilize multiple dosimetry devices. Methods: The initial end-to-end test and custom H and N phantom were designed to yield maximum information in anatomical regions significant to H and N plans with respect to: i) geometric accuracy, ii) dosimetric accuracy, and iii) treatment reproducibility. The phantom was designed in collaboration with Integrated Medical Technologies. A CT image was taken with a 1mm slice thickness. The CT was imported into Varian's Eclipse treatment planning system, where OARs and themore » PTV were contoured. A clinical template was used to create an eight field static gantry angle IMRT plan. After optimization, dose was calculated using the Analytic Anisotropic Algorithm with inhomogeneity correction. Plans were delivered with a TrueBeam equipped with a high definition MLC. Preliminary end-to-end results were measured using film and ion chambers. Ion chamber dose measurements were compared to the TPS. Films were analyzed with FilmQAPro using composite gamma index. Results: Film analysis for the initial end-to-end plan with a geometrically simple PTV showed average gamma pass rates >99% with a passing criterion of 3% / 3mm. Film analysis of a plan with a more realistic, ie. complex, PTV yielded pass rates >99% in clinically important regions containing the PTV, spinal cord and parotid glands. Ion chamber measurements were on average within 1.21% of calculated dose for both plans. Conclusion: trials have demonstrated that our end-to-end testing methods provide baseline values for the dosimetric and geometric accuracy of Varian's TrueBeam system.« less

  19. Optimization of Deep Drilling Performance--Development and Benchmark Testing of Advanced Diamond Product Drill Bits & HP/HT Fluids to Significantly Improve Rates of Penetration

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Alan Black; Arnis Judzis

    2003-10-01

    This document details the progress to date on the OPTIMIZATION OF DEEP DRILLING PERFORMANCE--DEVELOPMENT AND BENCHMARK TESTING OF ADVANCED DIAMOND PRODUCT DRILL BITS AND HP/HT FLUIDS TO SIGNIFICANTLY IMPROVE RATES OF PENETRATION contract for the year starting October 2002 through September 2002. The industry cost shared program aims to benchmark drilling rates of penetration in selected simulated deep formations and to significantly improve ROP through a team development of aggressive diamond product drill bit--fluid system technologies. Overall the objectives are as follows: Phase 1--Benchmark ''best in class'' diamond and other product drilling bits and fluids and develop concepts for amore » next level of deep drilling performance; Phase 2--Develop advanced smart bit--fluid prototypes and test at large scale; and Phase 3--Field trial smart bit--fluid concepts, modify as necessary and commercialize products. Accomplishments to date include the following: 4Q 2002--Project started; Industry Team was assembled; Kick-off meeting was held at DOE Morgantown; 1Q 2003--Engineering meeting was held at Hughes Christensen, The Woodlands Texas to prepare preliminary plans for development and testing and review equipment needs; Operators started sending information regarding their needs for deep drilling challenges and priorities for large-scale testing experimental matrix; Aramco joined the Industry Team as DEA 148 objectives paralleled the DOE project; 2Q 2003--Engineering and planning for high pressure drilling at TerraTek commenced; 3Q 2003--Continuation of engineering and design work for high pressure drilling at TerraTek; Baker Hughes INTEQ drilling Fluids and Hughes Christensen commence planning for Phase 1 testing--recommendations for bits and fluids.« less

  20. Educational Planning in the Labor Market: Linking Occupational Education to Regional Economic Development. Volume One.

    ERIC Educational Resources Information Center

    Northwestern Univ., Evanston, IL. Graduate School of Management.

    Activities, results, and recommendations of a 2-year effort to implement and test a model for vocational and occupational education planning in Illinois are described. An introductory section presents an overview of the rationale and plan for establishing a Regional Occupational Education Coordinating Council composed of representatives of the…

  1. Development of Autonomous Optimal Cooperative Control in Relay Rover Configured Small Unmanned Aerial Systems

    DTIC Science & Technology

    2013-03-01

    Unmanned Aircraft Systems Flight Plan that identified small unmanned aerial systems ( SUAS ) as “a profound technological...advances in small unmanned aerial systems ( SUAS ) cooperative control. The end state objective of the research effort was to flight test an autonomous...requirements were captured in the Unmanned Aircraft Systems Flight Plan . The flight plan

  2. Study of solid rocket motor for space shuttle booster, Volume 3: Program acquisition planning

    NASA Technical Reports Server (NTRS)

    1972-01-01

    The program planning acquisition functions for the development of the solid propellant rocket engine for the space shuttle booster is presented. The subjects discussed are: (1) program management, (2) contracts administration, (3) systems engineering, (4) configuration management, and (5) maintenance engineering. The plans for manufacturing, testing, and operations support are included.

  3. Drilling and Production Testing the Methane Hydrate Resource Potential Associated with the Barrow Gas Fields

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Steve McRae; Thomas Walsh; Michael Dunn

    2010-02-22

    In November of 2008, the Department of Energy (DOE) and the North Slope Borough (NSB) committed funding to develop a drilling plan to test the presence of hydrates in the producing formation of at least one of the Barrow Gas Fields, and to develop a production surveillance plan to monitor the behavior of hydrates as dissociation occurs. This drilling and surveillance plan was supported by earlier studies in Phase 1 of the project, including hydrate stability zone modeling, material balance modeling, and full-field history-matched reservoir simulation, all of which support the presence of methane hydrate in association with the Barrowmore » Gas Fields. This Phase 2 of the project, conducted over the past twelve months focused on selecting an optimal location for a hydrate test well; design of a logistics, drilling, completion and testing plan; and estimating costs for the activities. As originally proposed, the project was anticipated to benefit from industry activity in northwest Alaska, with opportunities to share equipment, personnel, services and mobilization and demobilization costs with one of the then-active exploration operators. The activity level dropped off, and this benefit evaporated, although plans for drilling of development wells in the BGF's matured, offering significant synergies and cost savings over a remote stand-alone drilling project. An optimal well location was chosen at the East Barrow No.18 well pad, and a vertical pilot/monitoring well and horizontal production test/surveillance well were engineered for drilling from this location. Both wells were designed with Distributed Temperature Survey (DTS) apparatus for monitoring of the hydrate-free gas interface. Once project scope was developed, a procurement process was implemented to engage the necessary service and equipment providers, and finalize project cost estimates. Based on cost proposals from vendors, total project estimated cost is $17.88 million dollars, inclusive of design work, permitting, barging, ice road/pad construction, drilling, completion, tie-in, long-term production testing and surveillance, data analysis and technology transfer. The PRA project team and North Slope have recommended moving forward to the execution phase of this project.« less

  4. Conventional fuel tank blunt impact tests : test and analysis results

    DOT National Transportation Integrated Search

    2014-04-02

    The Federal Railroad Administrations Office of Research : and Development is conducting research into fuel tank : crashworthiness. A series of impact tests are planned to : measure fuel tank deformation under two types of dynamic : loading conditi...

  5. Test requirements of locomotive fuel tank blunt impact tests

    DOT National Transportation Integrated Search

    2013-10-15

    The Federal Railroad Administrations Office of Research : and Development is conducting research into passenger : locomotive fuel tank crashworthiness. A series of impact tests : are planned to measure fuel tank deformation under two types : of dy...

  6. 75 FR 27997 - Record of Decision (ROD) for the Development and Implementation of Range-Wide Mission and Major...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-19

    ... (FEIS), including the following proposed land use changes: expansion of the Main Post and alterations in..., and increase in the level of test activities; development of six new Specialized Areas (four for test... Strategy Plan and siting process for facilitating future tests and training activities at WSMR; and...

  7. Environmental restoration and waste management: Robotics technology development program: Robotics 5-year program plan. [Contains glossary

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This plan covers robotics Research, Development, Demonstration, Testing, activities in the Program for the next five years. These activities range from bench-scale R D to fullscale hot demonstrations at DOE sites. This plan outlines applications of existing technology to near-term needs, the development and application of enhanced technology for longer-term needs, and an initiation of advanced technology development to meet those needs beyond the five-year plan. The objective of the Robotic Technology Development (RTDP) is to develop and apply robotics technologies that will enable Environmental Restoration and Waste Management operations at DOE sites to be safer, faster and cheaper. Fivemore » priority DOE sites were visited in March 1990 to identify needs for robotics technology in ER WM operations. This 5-Year Program Plan for the RTDP detailed annual plans for robotics technology development based on identified needs. This 5-Year Program Plan discusses the overall approach to be adopted by the RTDP to aggressively develop robotics technology and contains discussions of the Program Management Plan, Site Visit and Needs Summary, Approach to Needs-Directed Technical Development, Application-Specific Technical Development, and Cross-Cutting and Advanced Technology. Integrating application-specific ER WM needs, the current state of robotics technology, and the potential benefits (in terms of faster, safer, and cheaper) of new technology, the Plan develops application-specific road maps for robotics RDDT E for the period FY 1991 through FY 1995. In addition, the Plan identifies areas where longer-term research in robotics will have a high payoff in the 5- to 20-year time frame. 12 figs.« less

  8. Are You Ready for Y2K?

    ERIC Educational Resources Information Center

    Day, C. William

    1999-01-01

    Examines the planning process to identify equipment or systems within an educational facility that could be Y2K sensitive. Discusses developing a contingency plan to prevent operational shutdown. Concluding comments describe a simple Y2K equipment-testing procedure. (GR)

  9. A Critical Survey of Aircraft Maintenance Officer Training and Career Development.

    DTIC Science & Technology

    1982-09-01

    RESEARCH DESIGN AND METHODOLOGY ............ ... 52 Introduction ...... ................. ... 52 Data Collection Plan .... ............. ... 52 v CHAPTER...1,981 of whom held an AMO AFSC. The occupational data collected was used to develop job tasks inventories, demographic pro- files, organizational...Specifically, it addresses the data collection plans we used, the statistical tests we designed and applied, and the assumptions and limitations we

  10. Achieving compliance with environmental health-related land use planning conditions in Hong Kong: perspectives from traditional motivation theories.

    PubMed

    Man, Rita Li Yi

    2009-11-01

    Environmental health-related land use planning conditions can enhance the environment in Hong Kong. Previous research by others has shown, however, that a lack of compliance with planning conditions often occurs. And as no direct enforcement of planning conditions exists in Hong Kong, it is of interest to understand possible ways in which to increase the motivation of land developers and property owners to comply with planning conditions. The author looked at motivation from the perspective of three traditional motivation theories: Theory X, Theory Y, and incentive theory. While the majority of this article focuses on the enforcement and the legal tests in land use planning conditions, it also presents the results of the first study of the motivations behind Hong Kong land developers to comply with land use planning conditions.

  11. Advanced Launch System advanced development oxidizer turbopump program: Technical implementation plan

    NASA Technical Reports Server (NTRS)

    Ferlita, F.

    1989-01-01

    The Advanced Launch Systems (ALS) Advanced Development Oxidizer Turbopump Program has designed, fabricated and demonstrated a low cost, highly reliable oxidizer turbopump for the Space Transportation Engine that minimizes the recurring cost for the ALS engines. Pratt and Whitney's (P and W's) plan for integrating the analyses, testing, fabrication, and other program efforts is addressed. This plan offers a comprehensive description of the total effort required to design, fabricate, and test the ALS oxidizer turbopump. The proposed ALS oxidizer turbopump reduces turbopump costs over current designs by taking advantage of design simplicity and state-of-the-art materials and producibility features without compromising system reliability. This is accomplished by selecting turbopump operating conditions that are within known successful operating regions and by using proven manufacturing techniques.

  12. Planning fuel-conservative descents with or without time constraints using a small programmable calculator: algorithm development and flight test results

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Knox, C.E.

    A simplified flight-management descent algorithm, programmed on a small programmable calculator, was developed and flight tested. It was designed to aid the pilot in planning and executing a fuel-conservative descent to arrive at a metering fix at a time designated by the air traffic control system. The algorithm may also be used for planning fuel-conservative descents when time is not a consideration. The descent path was calculated for a constant Mach/airspeed schedule from linear approximations of airplane performance with considerations given for gross weight, wind, and nonstandard temperature effects. The flight-management descent algorithm is described. The results of flight testsmore » flown with a T-39A (Sabreliner) airplane are presented.« less

  13. ATF Neutron Irradiation Program Technical Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Geringer, J. W.; Katoh, Yutai

    The Japan Atomic Energy Agency (JAEA) under the Civil Nuclear Energy Working Group (CNWG) is engaged in a cooperative research effort with the U.S. Department of Energy (DOE) to explore issues related to nuclear energy, including research on accident-tolerant fuels and materials for use in light water reactors. This work develops a draft technical plan for a neutron irradiation program on the candidate accident-tolerant fuel cladding materials and elements using the High Flux Isotope Reactor (HFIR). The research program requires the design of a detailed experiment, development of test vehicles, irradiation of test specimens, possible post-irradiation examination and characterization ofmore » irradiated materials and the shipment of irradiated materials to JAEA in Japan. This report discusses the technical plan of the experimental study.« less

  14. Development of a Software Tool to Automate ADCO Flight Controller Console Planning Tasks

    NASA Technical Reports Server (NTRS)

    Anderson, Mark G.

    2011-01-01

    This independent study project covers the development of the International Space Station (ISS) Attitude Determination and Control Officer (ADCO) Planning Exchange APEX Tool. The primary goal of the tool is to streamline existing manual and time-intensive planning tools into a more automated, user-friendly application that interfaces with existing products and allows the ADCO to produce accurate products and timelines more effectively. This paper will survey the current ISS attitude planning process and its associated requirements, goals, documentation and software tools and how a software tool could simplify and automate many of the planning actions which occur at the ADCO console. The project will be covered from inception through the initial prototype delivery in November 2011 and will include development of design requirements and software as well as design verification and testing.

  15. Milestones Since Last Workshop [Global Positioning System Adjacent Band Compatibility Assessment Workshop V, 10/14/2016

    DOT National Transportation Integrated Search

    2016-10-14

    Milestones Since Last Workshop - Finalized GPS/GNSS receiver test plan and test procedures - Coordinated government and manufacturer participation and executed Non-Disclosure Agreements (NDAs) - Developed/validated radiated RF test environment - Carr...

  16. Nuclear rocket propulsion. NASA plans and progress, FY 1991

    NASA Technical Reports Server (NTRS)

    Clark, John S.; Miller, Thomas J.

    1991-01-01

    NASA has initiated planning for a technology development project for nuclear rocket propulsion systems for space explorer initiative (SEI) human and robotic missions to the moon and Mars. An interagency project is underway that includes the Department of Energy National Laboratories for nuclear technology development. The activities of the project planning team in FY 1990 and 1991 are summarized. The progress to date is discussed, and the project plan is reviewed. Critical technology issues were identified and include: (1) nuclear fuel temperature, life, and reliability; (2) nuclear system ground test; (3) safety; (4) autonomous system operation and health monitoring; and (5) minimum mass and high specific impulse.

  17. Nuclear rocket propulsion: NASA plans and progress - FY 1991

    NASA Technical Reports Server (NTRS)

    Clark, John S.; Miller, Thomas J.

    1991-01-01

    NASA has initiated planning for a technology development project for nuclear rocket propulsion systems for space exploration initiative (SEI) human and robotic missions to the Moon and to Mars. An interagency project is underway that includes the Department of Energy National Laboratories for nuclear technology development. The activities of the project planning team in FY 1990 and 1991 are summarized. The progress to date is discussed, and the project plan is reviewed. Critical technology issues were identified and include: (1) nuclear fuel temperature, life, and reliability; (2) nuclear system ground test; (3) safety; (4) autonomous system operation and health monitoring; and (5) minimum mass and high specific impulse.

  18. Development of Methodologic Tools for Planning and Managing Library Services: II. Measuring a Library's Capability for Providing Documents *

    PubMed Central

    Orr, Richard H.; Pings, Vern M.; Pizer, Irwin H.; Olson, Edwin E.; Spencer, Carol C.

    1968-01-01

    A method of measuring a library's capability for providing the documents its users need has been developed. The library is tested with a representative sample of such documents to determine how long would be required for users to obtain these documents. Test results are expressed in terms of a Capability Index, which has a maximal value of 100 only if all the sample documents are found “on shelf.” Specific tests employing samples of 300 documents have been developed that are appropriate for academic and for “reservoir” biomedical libraries. Realistic field trials have demonstrated that these two tests are practical to administer and that test results are adequately reproducible. When strict comparability is not important, a library can test itself. In assessing a reservoir library, test results are supplemented by data on its typical processing time for interlibrary loan requests. Currently these tests are being used in a national survey. The general method is applicable to other types of libraries, provided appropriate test samples are established. If their limitations are clearly understood, these “Document Delivery Tests” can be valuable tools for planning and managing library services. PMID:5665969

  19. Developing performance measures for alcohol and other drug services in managed care plans. Washington Circle Group.

    PubMed

    McCorry, F; Garnick, D W; Bartlett, J; Cotter, F; Chalk, M

    2000-11-01

    Monitoring the quality and availability of alcohol and other drug (AOD) services must be a central tenet of any health-related performance measurement system. The Washington Circle Group (WCG), which was convened by the Center for Substance Abuse Treatment Office of Managed Care in March 1998, has developed a core set of performance measures for AOD services for public- and private-sector health plans. It is also collaborating with a broad range of stakeholders to ensure widespread adoption of these performance measures by health plans, private employers, public payers, and accrediting organizations. Four domains were identified, with specific measures developed for each domain: (1) prevention/education, (2) recognition, (3) treatment (including initiation of alcohol and other plan services, linkage of detoxification and AOD plan services, treatment engagement, and interventions for family members/significant others), and (4) maintenance of treatment effects. Four measures that are based on administrative information from health plans and two measures that require a consumer survey of behavioral health care are undergoing extensive pilot testing. The WCG has reached out to a broad range of stakeholders in performance measurement and managed care to acquaint them with the measures and to promote their investigation and adoption. As results of pilot testing become available, these outreach efforts will continue. Performance measures for AOD services need to become an integral part of a comprehensive set of behavioral and physical health performance measures for managed care plans.

  20. Heavy hydrocarbon main injector technology

    NASA Technical Reports Server (NTRS)

    Fisher, S. C.; Arbit, H. A.

    1988-01-01

    One of the key components of the Advanced Launch System (ALS) is a large liquid rocket, booster engine. To keep the overall vehicle size and cost down, this engine will probably use liquid oxygen (LOX) and a heavy hydrocarbon, such as RP-1, as propellants and operate at relatively high chamber pressures to increase overall performance. A technology program (Heavy Hydrocarbon Main Injector Technology) is being studied. The main objective of this effort is to develop a logic plan and supporting experimental data base to reduce the risk of developing a large scale (approximately 750,000 lb thrust), high performance main injector system. The overall approach and program plan, from initial analyses to large scale, two dimensional combustor design and test, and the current status of the program are discussed. Progress includes performance and stability analyses, cold flow tests of injector model, design and fabrication of subscale injectors and calorimeter combustors for performance, heat transfer, and dynamic stability tests, and preparation of hot fire test plans. Related, current, high pressure, LOX/RP-1 injector technology efforts are also briefly discussed.

  1. Baseline Testing of the Hybrid Electric Transit Bus

    NASA Technical Reports Server (NTRS)

    Brown, Jeffrey C.; Eichenberg, Dennis J.; Thompson, William K.

    1999-01-01

    A government, industry and academic cooperative has developed a Hybrid Electric Transit Bus (HETB). Goals of the program include doubling the fuel economy of city transit buses currently in service, and reducing emissions to one-tenth of EPA standards. Unique aspects of the vehicle's power system include the use of ultra-capacitors for the energy storage system and the planned use of a natural gas fueled turbogenerator, to be developed from a small jet engine. At over 17000 kg gross weight, this is the largest vehicle to use ultra-capacitor energy storage. A description of the HETB, the results of performance testing, and future vehicle development plans are the subject of this report.

  2. Operationally efficient propulsion system study (OEPSS) data book. Volume 9; Preliminary Development Plan for an Integrated Booster Propulsion Module (BPM)

    NASA Technical Reports Server (NTRS)

    DiBlasi, Angelo G.

    1992-01-01

    A preliminary development plan for an integrated propulsion module (IPM) is described. The IPM, similar to the Space Transportation Main engine (STME) engine, is applicable to the Advanced Launch System (ALS) baseline vehicle. The same STME development program ground rules and time schedule were assumed for the IPM. However, the unique advantages of testing an integrated engine element, in terms of reduced number of hardware and number of system and reliability tests, compared to single standalone engine and MPTA, are highlighted. The potential ability of the IPM to meet the ALS program goals for robustness, operability and reliability is emphasized.

  3. Using Continuous Improvement to Enhance an Online Course

    ERIC Educational Resources Information Center

    Aggarwal, Anil K.; Lynn, Susan A.

    2012-01-01

    Assessment is becoming important from many different perspectives. Universities are planning, developing, and testing various assessment models to satisfy stakeholders. Many accrediting agencies are also requiring assessment plans and their implementation from universities for reaccreditation. This article describes how assessment was used to…

  4. 20 CFR 668.340 - What are INA grantee allowable activities?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ...; (7) Career counseling; (8) Provision of employment statistics information and local, regional, and... and specialized testing and assessment; (2) Development of an individual employment plan; (3) Group counseling; (4) Individual counseling and career planning; (5) Case Management for seeking training services...

  5. ENHANCED PRACTICAL PHOTOSYNTHETIC CO2 MITIGATION

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dr. Gregory Kremer; Dr. David J. Bayless; Dr. Morgan Vis

    2001-07-25

    This quarterly report documents significant achievements in the Enhanced Practical Photosynthetic CO{sub 2} Mitigation project during the period from 4/03/2001 through 7/02/2001. Most of the achievements are milestones in our efforts to complete the tasks and subtasks that constitute the project objectives. Note that this version of the quarterly technical report is a revision to add the reports from subcontractors Montana State and Oak Ridge National Laboratories The significant accomplishments for this quarter include: Development of an experimental plan and initiation of experiments to create a calibration curve that correlates algal chlorophyll levels with carbon levels (to simplify future experimentalmore » procedures); Completion of debugging of the slug flow reactor system, and development of a plan for testing the pressure drop of the slug flow reactor; Design and development of a new bioreactor screen design which integrates the nutrient delivery drip system and the harvesting system; Development of an experimental setup for testing the new integrated drip system/harvesting system; Completion of model-scale bioreactor tests examining the effects of CO{sub 2} concentration levels and lighting levels on Nostoc 86-3 growth rates; Completion of the construction of a larger model-scale bioreactor to improve and expand testing capabilities and initiation of tests; Substantial progress on construction of a pilot-scale bioreactor; and Preliminary economic analysis of photobioreactor deployment. Plans for next quarter's work are included in the conclusions. A preliminary economic analysis is included as an appendix.« less

  6. From an automated flight-test management system to a flight-test engineer's workstation

    NASA Technical Reports Server (NTRS)

    Duke, E. L.; Brumbaugh, R. W.; Hewett, M. D.; Tartt, D. M.

    1992-01-01

    Described here are the capabilities and evolution of a flight-test engineer's workstation (called TEST PLAN) from an automated flight-test management system. The concept and capabilities of the automated flight-test management system are explored and discussed to illustrate the value of advanced system prototyping and evolutionary software development.

  7. Final Report - DuraMelter 100 Tests to Support LAW Glass Formulation Correlation Development, VSL-06R6480-1, Rev. 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kruger, Albert A.; Muller, I. S.; Gong, W.

    2013-12-03

    This report describes the results of work and testing specified by Test Specifications 24590-LAW-TSP-RT-04-004, Rev. 0, Test Plans VSL-05T5480-1, Rev. 0 and Text Exceptions 24590-LAW-TEF-RT-05-00002. The work and any associated testing followed established quality assurance requirements and was conducted as authorized. The descriptions provided in this test report are an accurate account of both the conduct of the work and the data collected. Results required by the Test Plan are reported. Also reported are any unusual or anomalous occurences that are different from the starting hypotheses. The test results and this report have been reviewed and verified.

  8. Environmentally Responsible Aviation (ERA) Project - N+2 Advanced Vehicle Concepts Study and Conceptual Design of Subscale Test Vehicle (STV) Final Report

    NASA Technical Reports Server (NTRS)

    Bonet, John T.; Schellenger, Harvey G.; Rawdon, Blaine K.; Elmer, Kevin R.; Wakayama, Sean R.; Brown, Derrell L.; Guo, Yueping

    2011-01-01

    NASA has set demanding goals for technology developments to meet national needs to improve fuel efficiency concurrent with improving the environment to enable air transportation growth. A figure shows NASA's subsonic transport system metrics. The results of Boeing ERA N+2 Advanced Vehicle Concept Study show that the Blended Wing Body (BWB) vehicle, with ultra high bypass propulsion systems have the potential to meet the combined NASA ERA N+2 goals. This study had 3 main activities. 1) The development of an advanced vehicle concepts that can meet the NASA system level metrics. 2) Identification of key enabling technologies and the development of technology roadmaps and maturation plans. 3) The development of a subscale test vehicle that can demonstrate and mature the key enabling technologies needed to meet the NASA system level metrics. Technology maturation plans are presented and include key performance parameters and technical performance measures. The plans describe the risks that will be reduced with technology development and the expected progression of technical maturity.

  9. Final Decision Document for the Basin a Neck Groundwater Intercept and Treatment System Interim Response Action at the Rocky Mountain Arsenal.

    DTIC Science & Technology

    1989-02-01

    PLAN A Health and Safety Plan has been developed for the prevention of occupational injuries and illnesses during field activities at RMA. This plan...Bicycloheptadiene BCHPD 0(2) Bromoform CHBR3 100(4) note: total trihalomethanes Cadmium CD 10(1) 5(3)* 10(4) I Carbon tetrachloride CCL4 0(3) 5(4) Chlordane CLDAN...comments, numerous carcinogenicity tests in a variety of animals indicate that aldrin and dieldrin promote only liver tumors and the tumors develop only

  10. Understanding of and attitudes to genetic testing for inherited retinal disease: a patient perspective.

    PubMed

    Willis, T A; Potrata, B; Ahmed, M; Hewison, J; Gale, R; Downey, L; McKibbin, M

    2013-09-01

    The views of people with inherited retinal disease are important to help develop health policy and plan services. This study aimed to record levels of understanding of and attitudes to genetic testing for inherited retinal disease, and views on the availability of testing. Telephone questionnaires comprising quantitative and qualitative items were completed with adults with inherited retinal disease. Participants were recruited via postal invitation (response rate 48%), approach at clinic or newsletters of relevant charitable organisations. Questionnaires were completed with 200 participants. Responses indicated that participants' perceived understanding of genetic testing for inherited retinal disease was variable. The majority (90%) considered testing to be good/very good and would be likely to undergo genetic testing (90%) if offered. Most supported the provision of diagnostic (97%) and predictive (92%) testing, but support was less strong for testing as part of reproductive planning. Most (87%) agreed with the statement that testing should be offered only after the individual has received genetic counselling from a professional. Subgroup analyses revealed differences associated with participant age, gender, education level and ethnicity (p<0.02). Participants reported a range of perceived benefits (eg, family planning, access to treatment) and risks (eg, impact upon family relationships, emotional consequences). Adults with inherited retinal disease strongly support the provision of publicly funded genetic testing. Support was stronger for diagnostic and predictive testing than for testing as part of reproductive planning.

  11. Comparative evaluation of ERTS-A imagery for resource inventory in land-use planning

    NASA Technical Reports Server (NTRS)

    Simonson, G. H. (Principal Investigator)

    1972-01-01

    There are no author-identified significant results in this report. The overall objectives of this program are: (1) use of multidiscipline team approach to determine features that can be successfully monitored by ERTS-1 imagery for resource inventory, planning, land use zoning, and resource development; and (2) using carefully selected sample areas, develop a comprehensive resource inventory mapping system for use in planning, zoning, and resource development. Progress has included compilation and organization of ground truth data and observations in the primary study area of Crook County; resource inventory legend development; assembly and testing of color enhancement equipment; development and adaption of programs for digital data processing; and quick-look evaluations of initial ERTS-1 imagery for Oregon.

  12. Oxidizer Scoping Studies

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chancellor, Christopher John

    2016-11-07

    The purpose of this report is to present the results of the acceptable knowledge (AK) review of oxidizers present in active waste streams, provide a technical analysis of the oxidizers, and report the results of the scoping study testing. This report will determine the fastest burning oxidizer to be used in the development of a Test Plan for Preparation and Testing of Sorbents Mixed with Oxidizer found in Transuranic Waste (DWT-TP-001). The companion report, DWT-RPT-002, Sorbent Scoping Studies, contains similar information for sorbents identified during the AK review of TRU waste streams. The results of the oxidizer and sorbent scopingmore » studies will be used to inform the QL1 test plan. The QL1 test results will support the development of a basis of knowledge document that will evaluate oxidizing chemicals and sorbents in TRU waste and provide guidance for treatment.« less

  13. Robotic Access to Planetary Surfaces Capability Roadmap

    NASA Technical Reports Server (NTRS)

    2005-01-01

    A set of robotic access to planetary surfaces capability developments and supporting infrastructure have been identified. Reference mission pulls derived from ongoing strategic planning. Capability pushes to enable broader mission considerations. Facility and flight test capability needs. Those developments have been described to the level of detail needed for high-level planning. Content and approach. Readiness and metrics. Rough schedule and cost. Connectivity to mission concepts.

  14. The Individualized Quality Control Plan - Coming Soon to Clinical Microbiology Laboratories Everywhere!

    PubMed

    Anderson, Nancy

    2015-11-15

    As of January 1, 2016, microbiology laboratories can choose to adopt a new quality control option, the Individualized Quality Control Plan (IQCP), under the Clinical Laboratory Improvement Amendments of 1988 (CLIA). This voluntary approach increases flexibility for meeting regulatory requirements and provides laboratories the opportunity to customize QC for their testing in their unique environments and by their testing personnel. IQCP is an all-inclusive approach to quality based on risk management to address potential errors in the total testing process. It includes three main steps, (1) performing a risk assessment, (2) developing a QC plan, and (3) monitoring the plan through quality assessment. Resources are available from the Centers for Medicare & Medicaid Services, Centers for Disease Control and Prevention, American Society for Microbiology, Clinical and Laboratory Standards Institute, and accrediting organizations, such as the College of American Pathologists and Joint Commission, to assist microbiology laboratories implementing IQCP.

  15. Development of a Medicare Beneficiary Comprehension Test: Assessing Medicare Part D Beneficiaries' Comprehension of Their Benefits

    PubMed Central

    Aruru, Meghana V.; Salmon, J. Warren

    2013-01-01

    Background Medicare Part D, the senior prescription drug benefit plan, was introduced through the Medicare Modernization Act of 2003. Medicare beneficiaries receive information about plan options through multiple sources, and it is often assumed by consumer health plans and healthcare providers that beneficiaries can understand and compare plan information. Medicare beneficiaries are older, may have cognitive problems, and may not have a true understanding of managed care. They are more likely than younger persons to have inadequate health literacy, thereby demonstrating significant gaps in knowledge and information about healthcare. Objective To develop a Medicare Beneficiary Comprehension Test (MBCT) to evaluate Medicare beneficiaries' understanding of Part D plan concepts, as presented in the 2008 Medicare & You handbook. Methods A 10-question MBCT was developed using a case-vignette approach that required beneficiaries to read portions of the Medicare & You handbook and answer Part D–related questions associated with healthcare decision-making. The test was divided into 2 sections: (I) insurance concepts and (II) utilization management/appeals and grievances to cover standard terminology, as well as newer utilization management and appeals and grievances procedures that are unique to Part D. The test was administered to 100 beneficiaries at 2 sites—a university geriatrics clinic and a private retirement facility. Beneficiaries were tested for cognition and health literacy before being administered the test. Results The mean score on the MBCT was 3.5 of a maximum of 5, with no statistical difference found between both sites. Ten faculty members and 4 graduate students assessed the content validity of the instrument using a 4-point Likert rating rubric. The construct validity of the instrument was assessed using a principal components analysis with varimax rotation. The principal components analysis yielded 4 factors that were labeled as “Plan D concepts,” “managed care/utilization management,” “cost-sharing,” and “plan comparisons.” The factor analysis indicated that the test is multidimensional and did measure the construct. Conclusions Medicare beneficiaries' understanding of Part D may play a key role in the management of their drug use and health and the associated outcomes. The MBCT and its pending revisions can be administered to beneficiaries with differing health outcomes. Medicare beneficiaries are often faced with several pieces of information involving a complex array of choices amidst bewildering plan options. It is crucial that beneficiaries and/or their family members involved in the decision-making process understand the plan benefits to truly make an informed decision. As the number of Medicare beneficiaries increases over the coming years with the baby boomers, it becomes even more imperative that the elderly have improved access to treatments that can achieve desirable outcomes. Measuring comprehension by Medicare beneficiaries may be an initial step toward understanding more complex issues, such as treatment adherence, decision-making, and, ultimately, trends in healthcare utilization and outcomes. PMID:24991375

  16. Model Deformation and Optical Angle of Attack Measurement System in the NASA Ames Unitary Plan Wind Tunnel

    NASA Technical Reports Server (NTRS)

    Kushner, Laura K.; Drain, Bethany A.; Schairer, Edward T.; Heineck, James T.; Bell, James H.

    2017-01-01

    Both AoA and MDM measurements can be made using an optical system that relies on photogrammetry. Optical measurements are being requested by customers in wind tunnels with increasing frequency due to their non-intrusive nature and recent hardware and software advances that allow measurements to become near real time. The NASA Ames Research Center Unitary Plan Wind Tunnel is currently developing a system based on photogrammetry to measure model deformation and model angle of attack. This paper describes the new system, its development, its use on recent tests and plans to further develop the system.

  17. The Lunar Mapping and Modeling Project

    NASA Technical Reports Server (NTRS)

    Noble, Sarah K.; French, R. A.; Nall, M. E.; Muery, K. G.

    2009-01-01

    The Lunar Mapping and Modeling Project (LMMP) has been created to manage the development of a suite of lunar mapping and modeling products that support the Constellation Program (CxP) and other lunar exploration activities, including the planning, design, development, test and operations associated with lunar sortie missions, crewed and robotic operations on the surface, and the establishment of a lunar outpost. The information provided through LMMP will assist CxP in: planning tasks in the areas of landing site evaluation and selection, design and placement of landers and other stationary assets, design of rovers and other mobile assets, developing terrain-relative navigation (TRN) capabilities, and assessment and planning of science traverses.

  18. A Study of Facilities and Infrastructure Planning, Prioritization, and Assessment at Federal Security Laboratories (Revised)

    DTIC Science & Technology

    2013-02-01

    or funds authorized under Section 219(a) for projects costing no more than $4M. Research , Development, Test , and Evaluation (RDT&E) Appropriations...The RDT&E appropriation consists of the mission program budgets for all research , development, test and evaluation work performed by contractors...carry out an unspecified minor military construction project costing not more than $4,000,000. 9 f. Research , Development, Test , and Evaluation

  19. 45 CFR 400.154 - Employability services.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...-sufficiency plan and an individual employability plan, world-of-work and job orientation, job clubs, job workshops, job development, referral to job opportunities, job search, and job placement and followup. (b) Employability assessment services, including aptitude and skills testing. (c) On-the job training, when such...

  20. Biomass power for rural development. Technical progress report, January 1--March 31, 1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Neuhauser, E.

    Brief progress reports are presented on the following tasks: design packages for retrofits at the Dunkirk Station; fuel supply and site development plans; major equipment guarantees and project risk sharing; power production commitment; power plant site plan, construction and environmental permits; and experimental strategies for system evaluation. The paper then discusses in more detail the following: feedstock development efforts; clone-site testing and genetic studies; and efforts at outreach, extension and technology transfer.

  1. Preliminary development of a workstation for craniomaxillofacial surgical procedures: introducing a computer-assisted planning and execution system.

    PubMed

    Gordon, Chad R; Murphy, Ryan J; Coon, Devin; Basafa, Ehsan; Otake, Yoshito; Al Rakan, Mohammed; Rada, Erin; Susarla, Srinivas; Susarla, Sriniras; Swanson, Edward; Fishman, Elliot; Santiago, Gabriel; Brandacher, Gerald; Liacouras, Peter; Grant, Gerald; Armand, Mehran

    2014-01-01

    Facial transplantation represents one of the most complicated scenarios in craniofacial surgery because of skeletal, aesthetic, and dental discrepancies between donor and recipient. However, standard off-the-shelf vendor computer-assisted surgery systems may not provide custom features to mitigate the increased complexity of this particular procedure. We propose to develop a computer-assisted surgery solution customized for preoperative planning, intraoperative navigation including cutting guides, and dynamic, instantaneous feedback of cephalometric measurements/angles as needed for facial transplantation and other related craniomaxillofacial procedures. We developed the Computer-Assisted Planning and Execution (CAPE) workstation to assist with planning and execution of facial transplantation. Preoperative maxillofacial computed tomography (CT) scans were obtained on 4 size-mismatched miniature swine encompassing 2 live face-jaw-teeth transplants. The system was tested in a laboratory setting using plastic models of mismatched swine, after which the system was used in 2 live swine transplants. Postoperative CT imaging was obtained and compared with the preoperative plan and intraoperative measures from the CAPE workstation for both transplants. Plastic model tests familiarized the team with the CAPE workstation and identified several defects in the workflow. Live swine surgeries demonstrated utility of the CAPE system in the operating room, showing submillimeter registration error of 0.6 ± 0.24 mm and promising qualitative comparisons between intraoperative data and postoperative CT imaging. The initial development of the CAPE workstation demonstrated that integration of computer planning and intraoperative navigation for facial transplantation are possible with submillimeter accuracy. This approach can potentially improve preoperative planning, allowing ideal donor-recipient matching despite significant size mismatch, and accurate surgical execution for numerous types of craniofacial and orthognathic surgical procedures.

  2. Properties important to mixing and simulant recommendations for WTP full-scale vessel testing

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Poirier, M. R.; Martino, C. J.

    2015-12-01

    Full Scale Vessel Testing (FSVT) is being planned by Bechtel National, Inc., to demonstrate the ability of the standard high solids vessel design (SHSVD) to meet mixing requirements over the range of fluid properties planned for processing in the Pretreatment Facility (PTF) of the Hanford Waste Treatment and Immobilization Plant (WTP). Testing will use simulated waste rather than actual Hanford waste. Therefore, the use of suitable simulants is critical to achieving the goals of the test program. WTP personnel requested the Savannah River National Laboratory (SRNL) to assist with development of simulants for use in FSVT. Among the tasks assignedmore » to SRNL was to develop a list of waste properties that are important to pulse-jet mixer (PJM) performance in WTP vessels with elevated concentrations of solids.« less

  3. The Role of Tests in Assessing Intellectual Functioning of Children with Special Needs.

    ERIC Educational Resources Information Center

    Mearig, Judith S.

    1981-01-01

    Various testing methods have been developed to assess the intellectual functioning of children with learning disabilities, but testing is only one tool in the comprehensive process of assessment. The alternatives to relying exclusively on intelligence testing include ability tests, individual education plans, and beginning the teaching/programing…

  4. From an automated flight-test management system to a flight-test engineer's workstation

    NASA Technical Reports Server (NTRS)

    Duke, E. L.; Brumbaugh, Randal W.; Hewett, M. D.; Tartt, D. M.

    1991-01-01

    The capabilities and evolution is described of a flight engineer's workstation (called TEST-PLAN) from an automated flight test management system. The concept and capabilities of the automated flight test management systems are explored and discussed to illustrate the value of advanced system prototyping and evolutionary software development.

  5. Land use planning: a time-tested approach for addressing climate change

    Treesearch

    Rhonda Mazza; Jeff Kline; Jim.  Cathcart

    2009-01-01

    Oregon’s land use planning program has protected an estimated 1.2 million acres of forest and agricultural land from development since its inception in 1973. As a result, these resource lands continue to provide forest products and food as well as another unexpected benefit: carbon storage. By keeping forests as forests, land use planning capitalizes on the natural...

  6. Advanced composite elevator for Boeing 727 aircraft

    NASA Technical Reports Server (NTRS)

    1979-01-01

    Detail design activities are reported for a program to develop an advanced composites elevator for the Boeing 727 commercial transport. Design activities include discussion of the full scale ground test and flight test activities, the ancillary test programs, sustaining efforts, weight status, and the production status. Prior to flight testing of the advanced composites elevator, ground, flight flutter, and stability and control test plans were reviewed and approved by the FAA. Both the ground test and the flight test were conducted according to the approved plan, and were witnessed by the FAA. Three and one half shipsets have now been fabricated without any significant difficulty being encountered. Two elevator system shipsets were weighed, and results validated the 26% predicted weight reduction. The program is on schedule.

  7. Decision Models for Determining the Optimal Life Test Sampling Plans

    NASA Astrophysics Data System (ADS)

    Nechval, Nicholas A.; Nechval, Konstantin N.; Purgailis, Maris; Berzins, Gundars; Strelchonok, Vladimir F.

    2010-11-01

    Life test sampling plan is a technique, which consists of sampling, inspection, and decision making in determining the acceptance or rejection of a batch of products by experiments for examining the continuous usage time of the products. In life testing studies, the lifetime is usually assumed to be distributed as either a one-parameter exponential distribution, or a two-parameter Weibull distribution with the assumption that the shape parameter is known. Such oversimplified assumptions can facilitate the follow-up analyses, but may overlook the fact that the lifetime distribution can significantly affect the estimation of the failure rate of a product. Moreover, sampling costs, inspection costs, warranty costs, and rejection costs are all essential, and ought to be considered in choosing an appropriate sampling plan. The choice of an appropriate life test sampling plan is a crucial decision problem because a good plan not only can help producers save testing time, and reduce testing cost; but it also can positively affect the image of the product, and thus attract more consumers to buy it. This paper develops the frequentist (non-Bayesian) decision models for determining the optimal life test sampling plans with an aim of cost minimization by identifying the appropriate number of product failures in a sample that should be used as a threshold in judging the rejection of a batch. The two-parameter exponential and Weibull distributions with two unknown parameters are assumed to be appropriate for modelling the lifetime of a product. A practical numerical application is employed to demonstrate the proposed approach.

  8. SU-E-T-106: Development of a Collision Prediction Algorithm for Determining Problematic Geometry for SBRT Treatments Using a Stereotactic Body Frame

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wagar, M; Friesen, S; Mannarino, E

    2014-06-01

    Purpose: Collision between the gantry and the couch or patient during Radiotherapy is not a common concern for conventional RT (static fields or arc). With the increase in the application of stereotactic planning techniques to the body, collisions have become a greater concern. Non-coplanar beam geometry is desirable in stereotatic treatments in order to achieve sharp gradients and a high conformality. Non-coplanar geometry is less intuitive in the body and often requires an iterative process of planning and dry runs to guarantee deliverability. Methods: Purpose written software was developed in order to predict the likelihood of collision between the headmore » of the gantry and the couch, patient or stereotatic body frame. Using the DICOM plan and structures set, exported by the treatment planning system, this software is able to predict the possibility of a collision. Given the plan's isocenter, treatment geometry and exterior contours, the software is able to determine if a particular beam/arc is clinically deliverable or if collision is imminent. Results: The software was tested on real world treatment plans with untreatable beam geometry. Both static non-coplanar and VMAT plans were tested. Of these, the collision prediction software could identify all as having potentially problematic geometry. Re-plans of the same cases were also tested and validated as deliverable. Conclusion: This software is capable of giving good initial indication of deliverability for treatment plans that utilize complex geometry (SBRT) or have lateral isocenters. This software is not intended to replace the standard pre-treatment QA dry run. The effectiveness is limited to those portions of the patient and immobilization devices that have been included in the simulation CT and contoured in the planning system. It will however aid the planner in reducing the iterations required to create complex treatment geometries necessary to achieve ideal conformality and organ sparing.« less

  9. Design study of arresting gear system for recovery of space shuttle orbiters

    NASA Technical Reports Server (NTRS)

    1972-01-01

    A plan is reported for the design, manufacture, development, test, and production of an emergency arrestment system for the recovery of shuttle orbiters. Time and cost estimates are included. System testing and several optional test programs are discussed.

  10. Seismology software: state of the practice

    NASA Astrophysics Data System (ADS)

    Smith, W. Spencer; Zeng, Zheng; Carette, Jacques

    2018-05-01

    We analyzed the state of practice for software development in the seismology domain by comparing 30 software packages on four aspects: product, implementation, design, and process. We found room for improvement in most seismology software packages. The principal areas of concern include a lack of adequate requirements and design specification documents, a lack of test data to assess reliability, a lack of examples to get new users started, and a lack of technological tools to assist with managing the development process. To assist going forward, we provide recommendations for a document-driven development process that includes a problem statement, development plan, requirement specification, verification and validation (V&V) plan, design specification, code, V&V report, and a user manual. We also provide advice on tool use, including issue tracking, version control, code documentation, and testing tools.

  11. Seismology software: state of the practice

    NASA Astrophysics Data System (ADS)

    Smith, W. Spencer; Zeng, Zheng; Carette, Jacques

    2018-02-01

    We analyzed the state of practice for software development in the seismology domain by comparing 30 software packages on four aspects: product, implementation, design, and process. We found room for improvement in most seismology software packages. The principal areas of concern include a lack of adequate requirements and design specification documents, a lack of test data to assess reliability, a lack of examples to get new users started, and a lack of technological tools to assist with managing the development process. To assist going forward, we provide recommendations for a document-driven development process that includes a problem statement, development plan, requirement specification, verification and validation (V&V) plan, design specification, code, V&V report, and a user manual. We also provide advice on tool use, including issue tracking, version control, code documentation, and testing tools.

  12. Noncoplanar Beam Angle Class Solutions to Replace Time-Consuming Patient-Specific Beam Angle Optimization in Robotic Prostate Stereotactic Body Radiation Therapy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rossi, Linda, E-mail: l.rossi@erasmusmc.nl; Breedveld, Sebastiaan; Aluwini, Shafak

    Purpose: To investigate development of a recipe for the creation of a beam angle class solution (CS) for noncoplanar prostate stereotactic body radiation therapy to replace time-consuming individualized beam angle selection (iBAS) without significant loss in plan quality, using the in-house “Erasmus-iCycle” optimizer for fully automated beam profile optimization and iBAS. Methods and Materials: For 30 patients, Erasmus-iCycle was first used to generate 15-, 20-, and 25-beam iBAS plans for a CyberKnife equipped with a multileaf collimator. With these plans, 6 recipes for creation of beam angle CSs were investigated. Plans of 10 patients were used to create CSs based on themore » recipes, and the other 20 to independently test them. For these tests, Erasmus-iCycle was also used to generate intensity modulated radiation therapy plans for the fixed CS beam setups. Results: Of the tested recipes for CS creation, only 1 resulted in 15-, 20-, and 25-beam noncoplanar CSs without plan deterioration compared with iBAS. For the patient group, mean differences in rectum D{sub 1cc}, V{sub 60GyEq}, V{sub 40GyEq}, and D{sub mean} between 25-beam CS plans and 25-beam plans generated with iBAS were 0.2 ± 0.4 Gy, 0.1% ± 0.2%, 0.2% ± 0.3%, and 0.1 ± 0.2 Gy, respectively. Differences between 15- and 20-beam CS and iBAS plans were also negligible. Plan quality for CS plans relative to iBAS plans was also preserved when narrower planning target volume margins were arranged and when planning target volume dose inhomogeneity was decreased. Using a CS instead of iBAS reduced the computation time by a factor of 14 to 25, mainly depending on beam number, without loss in plan quality. Conclusions: A recipe for creation of robust beam angle CSs for robotic prostate stereotactic body radiation therapy has been developed. Compared with iBAS, computation times decreased by a factor 14 to 25. The use of a CS may avoid long planning times without losses in plan quality.« less

  13. Cell module and fuel conditioner development

    NASA Technical Reports Server (NTRS)

    Hoover, D. Q., Jr.

    1981-01-01

    The design features and plans for fabrication of Stacks 564 and 800 are described. The results of the OS/IES loop testing of Stack 562, endurance testing of Stack 560 and the post test analysis of Stack 561 are reported. Progress on construction and modification of the fuel cell test facilities and the 10 kW reformer test station is described. Efforts to develop the technical data base for the fuel conditioning system included vendor contacts, packed bed heat transfer tests, development of the BOLTAR computer program, and work on the detailed design of the 10 kW reformer are described.

  14. Developing models of how cognitive improvements change functioning: Mediation, moderation and moderated mediation

    PubMed Central

    Wykes, Til; Reeder, Clare; Huddy, Vyv; Taylor, Rumina; Wood, Helen; Ghirasim, Natalia; Kontis, Dimitrios; Landau, Sabine

    2012-01-01

    Background Cognitive remediation (CRT) affects functioning but the extent and type of cognitive improvements necessary are unknown. Aim To develop and test models of how cognitive improvement transfers to work behaviour using the data from a current service. Method Participants (N49) with a support worker and a paid or voluntary job were offered CRT in a Phase 2 single group design with three assessments: baseline, post therapy and follow-up. Working memory, cognitive flexibility, planning and work outcomes were assessed. Results Three models were tested (mediation — cognitive improvements drive functioning improvement; moderation — post treatment cognitive level affects the impact of CRT on functioning; moderated mediation — cognition drives functioning improvements only after a certain level is achieved). There was evidence of mediation (planning improvement associated with improved work quality). There was no evidence that cognitive flexibility (total Wisconsin Card Sorting Test errors) and working memory (Wechsler Adult Intelligence Scale III digit span) mediated work functioning despite significant effects. There was some evidence of moderated mediation for planning improvement if participants had poorer memory and/or made fewer WCST errors. The total CRT effect on work quality was d = 0.55, but the indirect (planning-mediated CRT effect) was d = 0.082 Conclusion Planning improvements led to better work quality but only accounted for a small proportion of the total effect on work outcome. Other specific and non-specific effects of CRT and the work programme are likely to account for some of the remaining effect. This is the first time complex models have been tested and future Phase 3 studies need to further test mediation and moderated mediation models. PMID:22503640

  15. 30 CFR 582.22 - Delineation Plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 2 2014-07-01 2014-07-01 false Delineation Plan. 582.22 Section 582.22 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OPERATIONS IN THE OUTER... minerals, and generate other information needed for the development of a comprehensive Testing or Mining...

  16. 30 CFR 582.22 - Delineation Plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 2 2012-07-01 2012-07-01 false Delineation Plan. 582.22 Section 582.22 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OPERATIONS IN THE OUTER... minerals, and generate other information needed for the development of a comprehensive Testing or Mining...

  17. 30 CFR 582.22 - Delineation Plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 2 2013-07-01 2013-07-01 false Delineation Plan. 582.22 Section 582.22 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OPERATIONS IN THE OUTER... minerals, and generate other information needed for the development of a comprehensive Testing or Mining...

  18. A reliability as an independent variable (RAIV) methodology for optimizing test planning for liquid rocket engines

    NASA Astrophysics Data System (ADS)

    Strunz, Richard; Herrmann, Jeffrey W.

    2011-12-01

    The hot fire test strategy for liquid rocket engines has always been a concern of space industry and agency alike because no recognized standard exists. Previous hot fire test plans focused on the verification of performance requirements but did not explicitly include reliability as a dimensioning variable. The stakeholders are, however, concerned about a hot fire test strategy that balances reliability, schedule, and affordability. A multiple criteria test planning model is presented that provides a framework to optimize the hot fire test strategy with respect to stakeholder concerns. The Staged Combustion Rocket Engine Demonstrator, a program of the European Space Agency, is used as example to provide the quantitative answer to the claim that a reduced thrust scale demonstrator is cost beneficial for a subsequent flight engine development. Scalability aspects of major subsystems are considered in the prior information definition inside the Bayesian framework. The model is also applied to assess the impact of an increase of the demonstrated reliability level on schedule and affordability.

  19. Comparison of composite prostate radiotherapy plan doses with dependent and independent boost phases.

    PubMed

    Narayanasamy, Ganesh; Avila, Gabrielle; Mavroidis, Panayiotis; Papanikolaou, Niko; Gutierrez, Alonso; Baacke, Diana; Shi, Zheng; Stathakis, Sotirios

    2016-09-01

    Prostate cases commonly consist of dual phase planning with a primary plan followed by a boost. Traditionally, the boost phase is planned independently from the primary plan with the risk of generating hot or cold spots in the composite plan. Alternatively, boost phase can be planned taking into account the primary dose. The aim of this study was to compare the composite plans from independently and dependently planned boosts using dosimetric and radiobiological metrics. Ten consecutive prostate patients previously treated at our institution were used to conduct this study on the Raystation™ 4.0 treatment planning system. For each patient, two composite plans were developed: a primary plan with an independently planned boost and a primary plan with a dependently planned boost phase. The primary plan was prescribed to 54 Gy in 30 fractions to the primary planning target volume (PTV1) which includes prostate and seminal vesicles, while the boost phases were prescribed to 24 Gy in 12 fractions to the boost planning target volume (PTV2) that targets only the prostate. PTV coverage, max dose, median dose, target conformity, dose homogeneity, dose to OARs, and probabilities of benefit, injury, and complication-free tumor control (P+) were compared. Statistical significance was tested using either a 2-tailed Student's t-test or Wilcoxon signed-rank test. Dosimetrically, the composite plan with dependent boost phase exhibited smaller hotspots, lower maximum dose to the target without any significant change to normal tissue dose. Radiobiologically, for all but one patient, the percent difference in the P+ values between the two methods was not significant. A large percent difference in P+ value could be attributed to an inferior primary plan. The benefits of considering the dose in primary plan while planning the boost is not significant unless a poor primary plan was achieved.

  20. PDSS configuration control plan and procedures

    NASA Technical Reports Server (NTRS)

    1983-01-01

    The payload development support system (PDSS) configuration control plan and procedures are presented. These plans and procedures establish the process for maintaining configuration control of the PDSS system, especially the Spacelab experiment interface device's (SEID) RAU, HRM, and PDI interface simulations and the PDSS ECOS DEP Services simulation. The plans and procedures as specified are designed to provide a simplified but complete configuration control process. The intent is to require a minimum amount of paperwork but provide total traceability of PDSS during experiment test activities.

  1. Development and Testing of Geo-Processing Models for the Automatic Generation of Remediation Plan and Navigation Data to Use in Industrial Disaster Remediation

    NASA Astrophysics Data System (ADS)

    Lucas, G.; Lénárt, C.; Solymosi, J.

    2015-08-01

    This paper introduces research done on the automatic preparation of remediation plans and navigation data for the precise guidance of heavy machinery in clean-up work after an industrial disaster. The input test data consists of a pollution extent shapefile derived from the processing of hyperspectral aerial survey data from the Kolontár red mud disaster. Three algorithms were developed and the respective scripts were written in Python. The first model aims at drawing a parcel clean-up plan. The model tests four different parcel orientations (0, 90, 45 and 135 degree) and keeps the plan where clean-up parcels are less numerous considering it is an optimal spatial configuration. The second model drifts the clean-up parcel of a work plan both vertically and horizontally following a grid pattern with sampling distance of a fifth of a parcel width and keep the most optimal drifted version; here also with the belief to reduce the final number of parcel features. The last model aims at drawing a navigation line in the middle of each clean-up parcel. The models work efficiently and achieve automatic optimized plan generation (parcels and navigation lines). Applying the first model we demonstrated that depending on the size and geometry of the features of the contaminated area layer, the number of clean-up parcels generated by the model varies in a range of 4% to 38% from plan to plan. Such a significant variation with the resulting feature numbers shows that the optimal orientation identification can result in saving work, time and money in remediation. The various tests demonstrated that the model gains efficiency when 1/ the individual features of contaminated area present a significant orientation with their geometry (features are long), 2/ the size of pollution extent features becomes closer to the size of the parcels (scale effect). The second model shows only 1% difference with the variation of feature number; so this last is less interesting for planning optimization applications. Last model rather simply fulfils the task it was designed for by drawing navigation lines.

  2. Reliability program requirements for aeronautical and space system contractors

    NASA Technical Reports Server (NTRS)

    1987-01-01

    General reliability program requirements for NASA contracts involving the design, development, fabrication, test, and/or use of aeronautical and space systems including critical ground support equipment are prescribed. The reliability program requirements require (1) thorough planning and effective management of the reliability effort; (2) definition of the major reliability tasks and their place as an integral part of the design and development process; (3) planning and evaluating the reliability of the system and its elements (including effects of software interfaces) through a program of analysis, review, and test; and (4) timely status indication by formal documentation and other reporting to facilitate control of the reliability program.

  3. A Tale of Two Regions: Landscape Ecological Planning for Shale Gas Energy Futures

    NASA Astrophysics Data System (ADS)

    Murtha, T., Jr.; Schroth, O.; Orland, B.; Goldberg, L.; Mazurczyk, T.

    2015-12-01

    As we increasingly embrace deep shale gas deposits to meet global energy demands new and dispersed local and regional policy and planning challenges emerge. Even in regions with long histories of energy extraction, such as coal, shale gas and the infrastructure needed to produce the gas and transport it to market offers uniquely complex transformations in land use and landcover not previously experienced. These transformations are fast paced, dispersed and can overwhelm local and regional planning and regulatory processes. Coupled to these transformations is a structural confounding factor. While extraction and testing are carried out locally, regulation and decision-making is multilayered, often influenced by national and international factors. Using a geodesign framework, this paper applies a set of geospatial landscape ecological planning tools in two shale gas settings. First, we describe and detail a series of ongoing studies and tools that we have developed for communities in the Marcellus Shale region of the eastern United States, specifically the northern tier of Pennsylvania. Second, we apply a subset of these tools to potential gas development areas of the Fylde region in Lancashire, United Kingdom. For the past five years we have tested, applied and refined a set of place based and data driven geospatial models for forecasting, envisioning, analyzing and evaluating shale gas activities in northern Pennsylvania. These models are continuously compared to important landscape ecological planning challenges and priorities in the region, e.g. visual and cultural resource preservation. Adapting and applying these tools to a different landscape allow us to not only isolate and define important regulatory and policy exigencies in each specific setting, but also to develop and refine these models for broader application. As we continue to explore increasingly complex energy solutions globally, we need an equally complex comparative set of landscape ecological planning tools to inform policy, design and regional planning. Adapting tools and techniques developed in Pennsylvania where shale gas extraction is ongoing to Lancashire, where industry is still in the exploratory phase offers a key opportunity to test and refine more generalizable models.

  4. Artificial intelligence and space power systems automation

    NASA Technical Reports Server (NTRS)

    Weeks, David J.

    1987-01-01

    Various applications of artificial intelligence to space electrical power systems are discussed. An overview is given of completed, on-going, and planned knowledge-based system activities. These applications include the Nickel-Cadmium Battery Expert System (NICBES) (the expert system interfaced with the Hubble Space Telescope electrical power system test bed); the early work with the Space Station Experiment Scheduler (SSES); the three expert systems under development in the space station advanced development effort in the core module power management and distribution system test bed; planned cooperation of expert systems in the Core Module Power Management and Distribution (CM/PMAD) system breadboard with expert systems for the space station at other research centers; and the intelligent data reduction expert system under development.

  5. Educational Technology Program.

    ERIC Educational Resources Information Center

    Frick, Frederick C.

    Recent work on the development and testing of various components of the Lincoln Training System (LTS) is reported. Plans were further developed for the testing of the LTS-1 terminal at the Keeler Technical Training Center in order to prove that this type of terminal can function as the main medium of teaching in a self-paced training environment.…

  6. Guidelines for testing and release procedures

    NASA Technical Reports Server (NTRS)

    Molari, R.; Conway, M.

    1984-01-01

    Guidelines and procedures are recommended for the testing and release of the types of computer software efforts commonly performed at NASA/Ames Research Center. All recommendations are based on the premise that testing and release activities must be specifically selected for the environment, size, and purpose of each individual software project. Guidelines are presented for building a Test Plan and using formal Test Plan and Test Care Inspections on it. Frequent references are made to NASA/Ames Guidelines for Software Inspections. Guidelines are presented for selecting an Overall Test Approach and for each of the four main phases of testing: (1) Unit Testing of Components, (2) Integration Testing of Components, (3) System Integration Testing, and (4) Acceptance Testing. Tools used for testing are listed, including those available from operating systems used at Ames, specialized tools which can be developed, unit test drivers, stub module generators, and the use of format test reporting schemes.

  7. Test Plan: WIPP bin-scale CH TRU waste tests

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Molecke, M.A.

    1990-08-01

    This WIPP Bin-Scale CH TRU Waste Test program described herein will provide relevant composition and kinetic rate data on gas generation and consumption resulting from TRU waste degradation, as impacted by synergistic interactions due to multiple degradation modes, waste form preparation, long-term repository environmental effects, engineered barrier materials, and, possibly, engineered modifications to be developed. Similar data on waste-brine leachate compositions and potentially hazardous volatile organic compounds released by the wastes will also be provided. The quantitative data output from these tests and associated technical expertise are required by the WIPP Performance Assessment (PA) program studies, and for the scientificmore » benefit of the overall WIPP project. This Test Plan describes the necessary scientific and technical aspects, justifications, and rational for successfully initiating and conducting the WIPP Bin-Scale CH TRU Waste Test program. This Test Plan is the controlling scientific design definition and overall requirements document for this WIPP in situ test, as defined by Sandia National Laboratories (SNL), scientific advisor to the US Department of Energy, WIPP Project Office (DOE/WPO). 55 refs., 16 figs., 19 tabs.« less

  8. Failure Engineering Study and Accelerated Stress Test Results for the Mars Global Surveyor Spacecraft's Power Shunt Assemblies

    NASA Technical Reports Server (NTRS)

    Gibbel, Mark; Larson, Tim

    1999-01-01

    Due to a post launch failure of a part a new plan for the Mars Global Surveyor was developed. This new plan involved the addition of many deep thermal cycles to the Power Shunt Assemblies (PSA's). This new plan exceeds the previous acceptance cold level, and fatigue life on packaging design. This presentation reviews the experiments that were used to test the capabilities of the PSA to function in the new situation. It also reviews the analyses preformed to verify the most likely failure mechanism, and the likelihood that these failures would impact the new mission requirements.

  9. Test and demonstration report on single and three phase 60 to 400 hz sleep inverter 3. 75kva Gulton model emir302

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rance, J.

    1979-03-20

    This Test and Demonstration Report presents the Test Plan and the results of the tests performed on SLEEP Inverter, Gulton Model EMIR302. The objective of the overall program is to design, develop, fabricate and test the 120V, 60 to 400Hz, 3.75KVA SLEEP Inverter in accordance with the requirements of U. S. Army Mobility Equipment Research and Development Command Specification EED 76 022501.

  10. Testing of sealed lead-acid batteries

    NASA Astrophysics Data System (ADS)

    Bush, D. M.; Sealey, J. D.; Miller, D. W.

    1984-02-01

    Sealed lead acid batteries under development were tested. The goal was to develop a totally maintenance free sealed lead acid battery capable of deep discharge operation in a photovoltaic power system. Sealed lead acid batteries and a group of conventional, flooded lead acid batteries were exposed to a matrix test plan, with some approaching 1000 cycles. This performance was achieved with the standard National Electrical Manufacturers' Association cycle test, and the partial state of charge cycle test. Modes of failure are investigated.

  11. Advanced composites wing study program, volume 2

    NASA Technical Reports Server (NTRS)

    Harvey, S. T.; Michaelson, G. L.

    1978-01-01

    The study on utilization of advanced composites in commercial aircraft wing structures was conducted as a part of the NASA Aircraft Energy Efficiency Program to establish, by the mid-1980s, the technology for the design of a subsonic commercial transport aircraft leading to a 40% fuel savings. The study objective was to develop a plan to define the effort needed to support a production commitment for the extensive use of composite materials in wings of new generation aircraft that will enter service in the 1985-1990 time period. Identification and analysis of what was needed to meet the above plan requirements resulted in a program plan consisting of three key development areas: (1) technology development; (2) production capability development; and (3) integration and validation by designing, building, and testing major development hardware.

  12. SU-E-T-508: End to End Testing of a Prototype Eclipse Module for Planning Modulated Arc Therapy On the Siemens Platform

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Huang, L; Sarkar, V; Spiessens, S

    2014-06-01

    Purpose: The latest clinical implementation of the Siemens Artiste linac allows for delivery of modulated arcs (mARC) using full-field flattening filter free (FFF) photon beams. The maximum doserate of 2000 MU/min is well suited for high dose treatments such as SBRT. We tested and report on the performance of a prototype Eclipse TPS module supporting mARC capability on the Artiste platform. Method: our spine SBRT patients originally treated with 12/13 field static-gantry IMRT (SGIMRT) were chosen for this study. These plans were designed to satisfy RTOG0631 guidelines with a prescription of 16Gy in a single fraction. The cases were re-plannedmore » as mARC plans in the prototype Eclipse module using the 7MV FFF beam and required to satisfy RTOG0631 requirements. All plans were transferred from Eclipse, delivered on a Siemens Artiste linac and dose-validated using the Delta4 system. Results: All treatment plans were straightforwardly developed, in timely fashion, without challenge or inefficiency using the prototype module. Due to the limited number of segments in a single arc, mARC plans required 2-3 full arcs to yield plan quality comparable to SGIMRT plans containing over 250 total segments. The average (3%/3mm) gamma pass-rate for all arcs was 98.5±1.1%, thus demonstrating both excellent dose prediction by the AAA dose algorithm and excellent delivery fidelity. Mean delivery times for the mARC plans(10.5±1.7min) were 50-70% lower than the SGIMRT plans(26±2min), with both delivered at 2000 MU/min. Conclusion: A prototype Eclipse module capable of planning for Burst Mode modulated arc delivery on the Artiste platform has been tested and found to perform efficiently and accurately for treatment plan development and delivered-dose prediction. Further investigation of more treatment sites is being carried out and data will be presented.« less

  13. Aerodynamic Database Development for the Hyper-X Airframe Integrated Scramjet Propulsion Experiments

    NASA Technical Reports Server (NTRS)

    Engelund, Walter C.; Holland, Scott D.; Cockrell, Charles E., Jr.; Bittner, Robert D.

    2000-01-01

    This paper provides an overview of the activities associated with the aerodynamic database which is being developed in support of NASA's Hyper-X scramjet flight experiments. Three flight tests are planned as part of the Hyper-X program. Each will utilize a small, nonrecoverable research vehicle with an airframe integrated scramjet propulsion engine. The research vehicles will be individually rocket boosted to the scramjet engine test points at Mach 7 and Mach 10. The research vehicles will then separate from the first stage booster vehicle and the scramjet engine test will be conducted prior to the terminal decent phase of the flight. An overview is provided of the activities associated with the development of the Hyper-X aerodynamic database, including wind tunnel test activities and parallel CFD analysis efforts for all phases of the Hyper-X flight tests. A brief summary of the Hyper-X research vehicle aerodynamic characteristics is provided, including the direct and indirect effects of the airframe integrated scramjet propulsion system operation on the basic airframe stability and control characteristics. Brief comments on the planned post flight data analysis efforts are also included.

  14. Development of an instrumentation plan for the Ohio SPS test pavement (DEL-23-17.48) : final report, October 1994.

    DOT National Transportation Integrated Search

    1994-07-01

    A Specific Pavement Studies (SPS) program, formulated under the Strategic Highway Research Program (SHRP), consists of nine experiments, four of which will be included in this DEL-23 project. Since the basic instrumentation plan proposed by SHRP was ...

  15. Development of an instrumentation plan for the Ohio SPS test pavement (DEL-23-17.48) : executive summary, July 1994.

    DOT National Transportation Integrated Search

    1994-07-01

    A Specific Pavement Studies (SPS) program, formulated under the Strategic Highway Research Program (SHRP), consists of nine experiments, four of which will be included in this DEL-23 project. Since the basic instrumentation plan proposed by SHRP was ...

  16. Mod-2 wind turbine system cluster research test program. Volume 1: Initial plan E-1290

    NASA Technical Reports Server (NTRS)

    Gordon, L. H.

    1982-01-01

    Upon completion of the design and development of three Mod-2 wind turbines, a series of research experiments are planned to gather data on and evaluate the performance, environmental effects, and operation of a cluster as well as a single, large multimegawatt wind turbine. Information on the program objectives, a Mod-2 system description, a planned schedule, organizational roles, and responsibilities, is included.

  17. Intelligent control of a planning system for astronaut training.

    PubMed

    Ortiz, J; Chen, G

    1999-07-01

    This work intends to design, analyze and solve, from the systems control perspective, a complex, dynamic, and multiconstrained planning system for generating training plans for crew members of the NASA-led International Space Station. Various intelligent planning systems have been developed within the framework of artificial intelligence. These planning systems generally lack a rigorous mathematical formalism to allow a reliable and flexible methodology for their design, modeling, and performance analysis in a dynamical, time-critical, and multiconstrained environment. Formulating the planning problem in the domain of discrete-event systems under a unified framework such that it can be modeled, designed, and analyzed as a control system will provide a self-contained theory for such planning systems. This will also provide a means to certify various planning systems for operations in the dynamical and complex environments in space. The work presented here completes the design, development, and analysis of an intricate, large-scale, and representative mathematical formulation for intelligent control of a real planning system for Space Station crew training. This planning system has been tested and used at NASA-Johnson Space Center.

  18. Application of the relative energy release criteria to enclosure fire testing. [aircraft compartments

    NASA Technical Reports Server (NTRS)

    Roschke, E. J.; Coulbert, C. D.

    1979-01-01

    The five relative energy release criteria (RERC) which are a first step towards formulating a unified concept that can be applied to the development of fires in enclosures, place upper bounds on the rate and amount of energy released during a fire. They are independent, calculated readily, and may be applied generally to any enclosure regardless of size. They are useful in pretest planning and for interpreting experimental data. Data from several specific fire test programs were examined to evaluate the potential use of RERC to provide test planning guidelines. The RERC were compared with experimental data obtained in full-scale enclosures. These results confirm that in general the RERC do identify the proper limiting constraints on enclosure fire development and determine the bounds of the fire development envelope. Plotting actual fire data against the RERC reveals new valid insights into fire behavior and reveals the controlling constraints in fire development. The RERC were calculated and plotted for several descrpitions of full-scale fires in various aircraft compartments.

  19. Control technique for planetary rover

    NASA Technical Reports Server (NTRS)

    Nakatani, Ichiro; Kubota, Takashi; Adachi, Tadashi; Saitou, Hiroaki; Okamoto, Sinya

    1994-01-01

    Beginning next century, several schemes for sending a planetary rover to the moon or Mars are being planned. As part of the development program, autonomous navigation technology is being studied to allow the rover the ability to move autonomously over a long range of unknown planetary surface. In the previous study, we ran the autonomous navigation experiment on an outdoor test terrain by using a rover test-bed that was controlled by a conventional sense-plan-act method. In some cases during the experiment, a problem occurred with the rover moving into untraversable areas. To improve this situation, a new control technique has been developed that gives the rover the ability of reacting to the outputs of the proximity sensors, a reaction behavior if you will. We have developed a new rover test-bed system on which an autonomous navigation experiment was performed using the newly developed control technique. In this outdoor experiment, the new control technique effectively produced the control command for the rover to avoid obstacles and be guided to the goal point safely.

  20. Adaptation and validation of the Tower of London test of planning and problem solving in people with intellectual disabilities.

    PubMed

    Masson, J D; Dagnan, D; Evans, J

    2010-05-01

    There is a need for validated, standardised tools for the assessment of executive functions in adults with intellectual disabilities (ID). This study examines the validity of a test of planning and problem solving (Tower of London) with adults with ID. Participants completed an adapted version of the Tower of London (ToL) while day-centre staff completed adaptive function (Adaptive Behaviour Scale - Residential and Community: Second Edition, modified version) and dysexecutive function (DEX-Independent Rater) questionnaires for each participant. Correlation analyses of test and questionnaire variables were undertaken. The adapted ToL has a robust structure and shows significant associations with independent living skills, challenging behaviour and behaviours related to dysexecutive function. The adapted ToL is a valid test for use with people with ID. However, there is also a need to develop other ecologically valid tools based on everyday planning tasks undertaken by people with ID.

  1. Operational flow visualization techniques in the Langley Unitary Plan Wind Tunnel

    NASA Technical Reports Server (NTRS)

    Corlett, W. A.

    1982-01-01

    The unitary plan wind tunnel (UPWT) uses in daily operation are shown. New ideas for improving the quality of established flow visualization methods are developed and programs on promising new flow visualization techniques are pursued. The unitary plan wind tunnel is a supersonic facility, referred to as a production facility, although the majority of tests are inhouse basic research investigations. The facility has two 4 ft. by 4 ft. test sections which span a Mach range from 1.5 to 4.6. The cost of operation is about $10 per minute. Problems are the time required for a flow visualization test setup and investigation costs and the ability to obtain consistently repeatable results. Examples of sublimation, vapor screen, oil flow, minitufts, schlieren, and shadowgraphs taken in UPWT are presented. All tests in UPWT employ one or more of the flow visualization techniques.

  2. Understanding of and attitudes to genetic testing for inherited retinal disease: a patient perspective

    PubMed Central

    Willis, T A; Potrata, B; Ahmed, M; Hewison, J; Gale, R; Downey, L; McKibbin, M

    2013-01-01

    Background/aims The views of people with inherited retinal disease are important to help develop health policy and plan services. This study aimed to record levels of understanding of and attitudes to genetic testing for inherited retinal disease, and views on the availability of testing. Methods Telephone questionnaires comprising quantitative and qualitative items were completed with adults with inherited retinal disease. Participants were recruited via postal invitation (response rate 48%), approach at clinic or newsletters of relevant charitable organisations. Results Questionnaires were completed with 200 participants. Responses indicated that participants’ perceived understanding of genetic testing for inherited retinal disease was variable. The majority (90%) considered testing to be good/very good and would be likely to undergo genetic testing (90%) if offered. Most supported the provision of diagnostic (97%) and predictive (92%) testing, but support was less strong for testing as part of reproductive planning. Most (87%) agreed with the statement that testing should be offered only after the individual has received genetic counselling from a professional. Subgroup analyses revealed differences associated with participant age, gender, education level and ethnicity (p<0.02). Participants reported a range of perceived benefits (eg, family planning, access to treatment) and risks (eg, impact upon family relationships, emotional consequences). Conclusions Adults with inherited retinal disease strongly support the provision of publicly funded genetic testing. Support was stronger for diagnostic and predictive testing than for testing as part of reproductive planning. PMID:23813418

  3. Assessing quality of care for migraineurs: a model health plan measurement set.

    PubMed

    Leas, Brian F; Gagne, Joshua J; Goldfarb, Neil I; Rupnow, Marcia F T; Silberstein, Stephen

    2008-08-01

    Quality of care measures are increasingly important to health plans, purchasers, physicians, and patients. Appropriate measures can be used to assess quality and evaluate improvement and are necessary components of pay-for-performance programs. Despite the broad scope of activity in the development of quality measures, migraine headache has received little attention. Given the enormous costs associated with migraine, especially in terms of lost productivity and preventable health care utilization, health plans could gain from a structured approach to measuring the quality of migraine care their beneficiaries receive. A potential migraine quality measurement set was developed through a review of migraine care literature and guidelines, interviews with leaders in migraine care, health care purchasing, and managed care, and the assembly of an advisory board. The board discussed candidate measures and established consensus on a testable measurement set. Twenty measures were developed, focused primarily on diagnosis and utilization. Areas of utilization include physician visits, emergency department visits, hospitalizations, and imaging. Use of both acute and preventive medications is included. More complex aspects of migraine care are also addressed, including triptan overuse, the relationship between acute and preventive medications, and follow-up after emergency department visits. The measures are currently being tested in health plans to assess their feasibility and value. A compelling case can be made for the development of migraine-specific quality measures for health plans. This effort to develop and test a starter set of measures should lead to new and innovative efforts to assess and improve quality of care for migraineurs.

  4. 77 FR 1708 - Cooperative Research and Development Agreement: Technology To Provide Wireless Precise Time...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-11

    ... determine the viability of certain wireless alternative timing approaches by conducting live, on-air tests... conducted from other sites as deemed necessary during CRADA testing. Reception of these test broadcasts are..., Test Plan, and Project Report for each phase of the CRADA work. We anticipate that the non-Federal...

  5. National remote computational flight research facility

    NASA Technical Reports Server (NTRS)

    Rediess, Herman A.

    1989-01-01

    The extension of the NASA Ames-Dryden remotely augmented vehicle (RAV) facility to accommodate flight testing of a hypersonic aircraft utilizing the continental United States as a test range is investigated. The development and demonstration of an automated flight test management system (ATMS) that uses expert system technology for flight test planning, scheduling, and execution is documented.

  6. Intelligent Engine Systems: Bearing System

    NASA Technical Reports Server (NTRS)

    Singh, Arnant P.

    2008-01-01

    The overall requirements necessary for sensing bearing distress and the related criteria to select a particular rotating sensor were established during the phase I. The current phase II efforts performed studies to evaluate the Robustness and Durability Enhancement of the rotating sensors, and to design, and develop the Built-in Telemetry System concepts for an aircraft engine differential sump. A generic test vehicle that can test the proposed bearing diagnostic system was designed, developed, and built. The Timken Company, who also assisted with testing the GE concept of using rotating sensors for the differential bearing diagnostics during previous phase, was selected as a subcontractor to assist General Electric (GE) for the design, and procurement of the test vehicle. A purchase order was prepared to define the different sub-tasks, and deliverables for this task. The University of Akron was selected to provide the necessary support for installing, and integrating the test vehicle with their newly designed test facility capable of simulating the operating environment for the planned testing. The planned testing with good and damaged bearings will be on hold pending further continuation of this effort during next phase.

  7. Quality-assurance plan for groundwater activities, U.S. Geological Survey, Washington Water Science Center

    USGS Publications Warehouse

    Kozar, Mark D.; Kahle, Sue C.

    2013-01-01

    This report documents the standard procedures, policies, and field methods used by the U.S. Geological Survey’s (USGS) Washington Water Science Center staff for activities related to the collection, processing, analysis, storage, and publication of groundwater data. This groundwater quality-assurance plan changes through time to accommodate new methods and requirements developed by the Washington Water Science Center and the USGS Office of Groundwater. The plan is based largely on requirements and guidelines provided by the USGS Office of Groundwater, or the USGS Water Mission Area. Regular updates to this plan represent an integral part of the quality-assurance process. Because numerous policy memoranda have been issued by the Office of Groundwater since the previous groundwater quality assurance plan was written, this report is a substantial revision of the previous report, supplants it, and contains significant additional policies not covered in the previous report. This updated plan includes information related to the organization and responsibilities of USGS Washington Water Science Center staff, training, safety, project proposal development, project review procedures, data collection activities, data processing activities, report review procedures, and archiving of field data and interpretative information pertaining to groundwater flow models, borehole aquifer tests, and aquifer tests. Important updates from the previous groundwater quality assurance plan include: (1) procedures for documenting and archiving of groundwater flow models; (2) revisions to procedures and policies for the creation of sites in the Groundwater Site Inventory database; (3) adoption of new water-level forms to be used within the USGS Washington Water Science Center; (4) procedures for future creation of borehole geophysics, surface geophysics, and aquifer-test archives; and (5) use of the USGS Multi Optional Network Key Entry System software for entry of routine water-level data collected as part of long-term water-level monitoring networks.

  8. The development of a program analysis environment for Ada

    NASA Technical Reports Server (NTRS)

    Brown, David B.; Carlisle, Homer W.; Chang, Kai-Hsiung; Cross, James H.; Deason, William H.; Haga, Kevin D.; Huggins, John R.; Keleher, William R. A.; Starke, Benjamin B.; Weyrich, Orville R.

    1989-01-01

    A unit level, Ada software module testing system, called Query Utility Environment for Software Testing of Ada (QUEST/Ada), is described. The project calls for the design and development of a prototype system. QUEST/Ada design began with a definition of the overall system structure and a description of component dependencies. The project team was divided into three groups to resolve the preliminary designs of the parser/scanner: the test data generator, and the test coverage analyzer. The Phase 1 report is a working document from which the system documentation will evolve. It provides history, a guide to report sections, a literature review, the definition of the system structure and high level interfaces, descriptions of the prototype scope, the three major components, and the plan for the remainder of the project. The appendices include specifications, statistics, two papers derived from the current research, a preliminary users' manual, and the proposal and work plan for Phase 2.

  9. Test/QA Plan For Verification Of Anaerobic Digester For Energy Production And Pollution Prevention

    EPA Science Inventory

    The ETV-ESTE Program conducts third-party verification testing of commercially available technologies that improve the environmental conditions in the U.S. A stakeholder committee of buyers and users of such technologies guided the development of this test on anaerobic digesters...

  10. Solar heater/cooler for mass market

    NASA Technical Reports Server (NTRS)

    1981-01-01

    Report describes project to design, build, and test simple and affordable solar systems. Four combinations of heating, cooling, and domestic hot water supply systems were developed and installed. Test sites, plan for systems and components, and performance are discussed; text is complimented by detailed drawings and test data.

  11. Ride Dynamics and Evaluation of Human Exposure to Whole Body Vibration. Change 1

    DTIC Science & Technology

    2012-04-03

    vehicle specification and/or the detailed test plan. This (half-round obstacle) accelerometer will be low-pass filtered ( post test ) at 30 Hz...Engineers TARADCOM Tank-Automotive Research and Development Command TOP Test Operations Procedure VDV Vibration Dose Value WBV Whole Body...

  12. Yield model development project implementation plan

    NASA Technical Reports Server (NTRS)

    Ambroziak, R. A.

    1982-01-01

    Tasks remaining to be completed are summarized for the following major project elements: (1) evaluation of crop yield models; (2) crop yield model research and development; (3) data acquisition processing, and storage; (4) related yield research: defining spectral and/or remote sensing data requirements; developing input for driving and testing crop growth/yield models; real time testing of wheat plant process models) and (5) project management and support.

  13. SPF Full-scale emissions test method development status ...

    EPA Pesticide Factsheets

    This is a non-technical presentation that is intended to inform ASTM task group members about our intended approach to full-scale emissions testing that includes the application of spray foam in an environmental chamber. The presentation describes the approach to emissions characterization, types of measurement systems employed, and expected outcomes from the planned tests. Purpose of this presentation is to update the ASTM D22.05 work group regarding status of our full-scale emissions test method development.

  14. Design and utilization of a Flight Test Engineering Database Management System at the NASA Dryden Flight Research Facility

    NASA Technical Reports Server (NTRS)

    Knighton, Donna L.

    1992-01-01

    A Flight Test Engineering Database Management System (FTE DBMS) was designed and implemented at the NASA Dryden Flight Research Facility. The X-29 Forward Swept Wing Advanced Technology Demonstrator flight research program was chosen for the initial system development and implementation. The FTE DBMS greatly assisted in planning and 'mass production' card preparation for an accelerated X-29 research program. Improved Test Plan tracking and maneuver management for a high flight-rate program were proven, and flight rates of up to three flights per day, two times per week were maintained.

  15. Electric Vehicle Communication Standards Testing and Validation Phase I: SAE J2847/1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pratt, Richard M.; Tuffner, Francis K.; Gowri, Krishnan

    Executive Summary Vehicle to grid communication standards are critical to the charge management and interoperability among vehicles, charging stations and utility providers. Several standards initiatives by the Society of Automobile Engineers (SAE), International Standards Organization and International Electrotechnical Commission (ISO/IEC), and ZigBee / HomePlug Alliance are developing requirements for communication messages and protocols. While the standard development is in progress for more than two years, no definitive guidelines are available for the automobile manufacturers, charging station manufacturers and utility backhaul network systems. At present, there is a wide range of proprietary communication options developed and supported in the industry. Recentmore » work by the Electric Power Research Institute (EPRI) in collaboration with SAE and automobile manufacturers has identified performance requirements and test plan based on possible communication pathways using power line communication over the control pilot and mains. Though the communication pathways and power line communication technology options are identified, much work needs to be done in developing application software and testing of communication modules before these can be deployed in production vehicles. This report presents a test plan and results from initial testing of two power line communication modules developed to meet the requirements of SAE J2847/1 standard.« less

  16. Commerce Lab - An enabling facility and test bed for commercial flight opportunities

    NASA Technical Reports Server (NTRS)

    Robertson, Jack; Atkins, Harry L.; Williams, John R.

    1986-01-01

    Commerce Lab is conceived as an adjunct to the National Space Transportation System (NSTS) by providing a focal point for commercial missions which could utilize existing NSTS carrier and resource capabilities for on-orbit experimentation in the microgravity sciences. In this context, the Commerce Lab provides an enabling facility and test bed for commercial flight opportunities. Commerce Lab program activities to date have focused on mission planning for private sector involvement in the space program to facilitate the commercial exploitation of the microgravity environment for materials processing research and development. It is expected that Commerce Lab will provide a logical transition between currently planned NSTS missions and future microgravity science and commercial R&D missions centered around the Space Station. The present study identifies candidate Commerce Lab flight experiments and their development status and projects a mission traffic model that can be used in commercial mission planning.

  17. RELAP-7 Software Verification and Validation Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Smith, Curtis L.; Choi, Yong-Joon; Zou, Ling

    This INL plan comprehensively describes the software for RELAP-7 and documents the software, interface, and software design requirements for the application. The plan also describes the testing-based software verification and validation (SV&V) process—a set of specially designed software models used to test RELAP-7. The RELAP-7 (Reactor Excursion and Leak Analysis Program) code is a nuclear reactor system safety analysis code being developed at Idaho National Laboratory (INL). The code is based on the INL’s modern scientific software development framework – MOOSE (Multi-Physics Object-Oriented Simulation Environment). The overall design goal of RELAP-7 is to take advantage of the previous thirty yearsmore » of advancements in computer architecture, software design, numerical integration methods, and physical models. The end result will be a reactor systems analysis capability that retains and improves upon RELAP5’s capability and extends the analysis capability for all reactor system simulation scenarios.« less

  18. Creating more effective health plan quality reports for consumers: lessons from a synthesis of qualitative testing.

    PubMed Central

    Harris-Kojetin, L D; McCormack, L A; Jaël, E F; Sangl, J A; Garfinkel, S A

    2001-01-01

    OBJECTIVE: Social marketing techniques such as consumer testing have only recently been applied to develop effective consumer health insurance information. This article discusses lessons learned from consumer testing to create consumer plan choice materials. DATA SOURCES/STUDY SETTING: Data were collected from 268 publicly and privately insured consumers in three studies between 1994 and 1999. STUDY DESIGN: Iterative testing and revisions were conducted to design seven booklets to help Medicaid, Medicare, and employed consumers choose a health plan. DATA COLLECTION METHODS: Standardized protocols were used in 11 focus groups and 182 interviews to examine the content, comprehension, navigation, and utility of the booklets. PRINCIPAL FINDINGS: A method is suggested to help consumers narrow their plan choices by breaking down the process into smaller decisions using a set of guided worksheets. CONCLUSION: Implementing these lessons is challenging and not often done well. This article gives examples of evidence-based approaches to address cognitive barriers that designers of consumer health insurance information can adapt to their needs. Images Figure. 3 PMID:11482584

  19. Development of community plans to enhance survivorship from colorectal cancer: community-based participatory research in rural communities.

    PubMed

    Lengerich, Eugene J; Kluhsman, Brenda C; Bencivenga, Marcyann; Allen, Regina; Miele, Mary Beth; Farace, Elana

    2007-09-01

    In 2002, 10.4% of the 10 million persons alive who have ever been diagnosed with cancer had colorectal cancer (CRC). Barriers, such as distance, terrain, access to care and cultural differences, to CRC survivorship may be especially relevant in rural communities. We tested the hypothesis that teams from rural cancer coalitions and hospitals would develop a Community Plan (CP) to enhance CRC survivorship. We used community-based participatory research and the PRECEDE-PROCEED model to train teams from rural cancer coalitions and hospitals in Pennsylvania and New York. We measured knowledge at three points in time and tested the change with McNemar's test, corrected for multiple comparisons (p < 0.0167). We also conducted a qualitative review of the CP contents. Fourteen (93.3%) of the 15 coalitions or hospitals initially recruited to the study completed a CP. Knowledge in public health, sponsorship of A National Action Plan for Cancer Survivorship, and CRC survivorship and treatment increased. Teams identified perceived barriers and community assets. All teams planned to increase awareness of community assets and almost all planned to enhance treatment-related care and psychosocial care for the CRC survivor; 50% planned to enhance primary care and CRC screening. The study demonstrated the interest and ability of rural organizations to plan to enhance CRC survivorship, including linkage of CRC survivorship to primary care. Rural cancer coalitions and hospitals may be a vehicle to develop local action for A National Action Plan. Access to more comprehensive care for CRC cancer survivors in rural communities appears to be facilitated by the community-based initiative described and investigated in this study. Efforts such as these could be replicated in other rural communities and may impact the care and quality of life of survivors with many types of cancers. While access to health services may be increased through community-based initiatives, we still need to measure the impact of such initiatives on the long term health and well being of cancer survivors in rural locations.

  20. Entrepreneurial Intentions in Developing and Developed Countries

    ERIC Educational Resources Information Center

    Iakovleva, Tatiana; Kolvereid, Lars; Stephan, Ute

    2011-01-01

    Purpose: This study proposes to use the Theory of Planned Behaviour to predict entrepreneurial intentions among students in five developing and nine developed countries. The purpose is to investigate whether entrepreneurial intention and its antecedents differ between developing and developed countries, and to test the theory in the two groups of…

  1. Assessing the health equity impacts of regional land-use plan making: An equity focussed health impact assessment of alternative patterns of development of the Whitsunday Hinterland and Mackay Regional Plan, Australia (Short report)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gunning, Colleen, E-mail: Colleen_Gunning@health.qld.gov.a; Harris, Patrick; Mallett, John

    2011-07-15

    Health service and partners completed an equity focussed health impact assessment to influence the consideration of health and equity within regional land-use planning in Queensland, Australia. This project demonstrated how an equity oriented assessment matrix can assist in testing regional planning scenarios. It is hoped that this HIA will contribute to the emerging interest in ensuring that potential differential health impacts continue to be considered as part of land-use planning processes.

  2. Cell module and fuel conditioner development

    NASA Technical Reports Server (NTRS)

    Hoover, D. Q., Jr.

    1981-01-01

    The results of pretesting and performance testing of Stack 564 are reported. The design features, progress in fabrication and plans for assembly of Stack 800 are given. The status of endurance testing of Stack 560 is reported. The design, fabrication, test procedures and preliminary tests of the 10 kW double counterflow reformer and the reformer test stand are described. Results of vendor contacts to define the performance and cost of fuel conditioning system components are reported. The results of burner tests and continuing development of the BOLTAR program are reported.

  3. Electron/proton spectrometer certification documentation analyses

    NASA Technical Reports Server (NTRS)

    Gleeson, P.

    1972-01-01

    A compilation of analyses generated during the development of the electron-proton spectrometer for the Skylab program is presented. The data documents the analyses required by the electron-proton spectrometer verification plan. The verification plan was generated to satisfy the ancillary hardware requirements of the Apollo Applications program. The certification of the spectrometer requires that various tests, inspections, and analyses be documented, approved, and accepted by reliability and quality control personnel of the spectrometer development program.

  4. Recommendations for the evaluation of specimen stability for flow cytometric testing during drug development.

    PubMed

    Brown, Lynette; Green, Cherie L; Jones, Nicholas; Stewart, Jennifer J; Fraser, Stephanie; Howell, Kathy; Xu, Yuanxin; Hill, Carla G; Wiwi, Christopher A; White, Wendy I; O'Brien, Peter J; Litwin, Virginia

    2015-03-01

    The objective of this manuscript is to present an approach for evaluating specimen stability for flow cytometric methods used during drug development. While this approach specifically addresses stability assessment for assays to be used in clinical trials with centralized testing facilities, the concepts can be applied to any stability assessment for flow cytometric methods. The proposed approach is implemented during assay development and optimization, and includes suggestions for designing a stability assessment plan, data evaluation and acceptance criteria. Given that no single solution will be applicable in all scenarios, this manuscript offers the reader a roadmap for stability assessment and is intended to guide the investigator during both the method development phase and in the experimental design of the validation plan. Copyright © 2015 Elsevier B.V. All rights reserved.

  5. Roll-On/Roll-Off Phase 2. Field Test Plan

    DTIC Science & Technology

    1983-06-06

    Ferry 1.8 1610 Class LCU (Navy and Army) 2.1 RO/RO Test Schedule 3.1 CYGNUS Inboard Profile and Plan View 3.2 Ponce De Leon Class Inboard Profile and...BACKGROUND The bulk of the wheeled and tracked vehicles required by forces involved in a land campaign will be transported to the " theater of operations by...0 developed equipment for unloading these ships offshore and transporting their vehicles across the shoreline to inland * locations. (1) Previous

  6. The Development of a Tactical Dual-Wavelength Nephelometer.

    DTIC Science & Technology

    1982-11-24

    Instrument Layout 50 4.5 Optical Systems 53 4.6 Electronic Systems 56 4.6.1 Transmitter System 56 4.6.2 Receiver Systems 58 5. R&D TEST AND ACCEPTANCE PLAN 61... PLAN , 136 HSS-B-086, 10 DEC1981. APPENDIX B ARVIN CALSPAN DOCUMENTATION OF 155 EXTINCTION AND PARTICLE SIZE MEASUREMENTS FOR CHAMBER TESTS OF MAY 1982. 6...121 FP’enn Aerosol Models. 8.9 Aerosol Extinction Coefficients at Two Wavelenghts 129 and their Ratio for Four Deirmendjian Aerosol Models. 10

  7. Satellite power system (SPS) concept definition study. Volume 3: Experimental verification definition

    NASA Technical Reports Server (NTRS)

    Hanley, G. M.

    1980-01-01

    An evolutionary Satellite Power Systems development plan was prepared. Planning analysis was directed toward the evolution of a scenario that met the stated objectives, was technically possible and economically attractive, and took into account constraining considerations, such as requirements for very large scale end-to-end demonstration in a compressed time frame, the relative cost/technical merits of ground testing versus space testing, and the need for large mass flow capability to low Earth orbit and geosynchronous orbit at reasonable cost per pound.

  8. WSTIAC: Weapon Systems Technology Information Analysis Center. Volume 6, Number 1

    DTIC Science & Technology

    2005-01-01

    official documentation. 2 WS"IAE Newslelter Winter 2005 Lobster Robo [s (Continued from page 1) When compared to terrestrial arthropods, underwater...were partially offset by a net during the S&T phase, could help ease the transition to the decrease of planned quantities to be purchased (-$24.4...environment to archive the ly always involves the use of a Test and Evaluation Master development of an entire system, on paper qnd/or elec- Plan (TEMP). Test

  9. Multiple IMU system test plan, volume 4. [subroutines for space shuttle requirements

    NASA Technical Reports Server (NTRS)

    Landey, M.; Vincent, K. T., Jr.; Whittredge, R. S.

    1974-01-01

    Operating procedures for this redundant system are described. A test plan is developed with two objectives. First, performance of the hardware and software delivered is demonstrated. Second, applicability of multiple IMU systems to the space shuttle mission is shown through detailed experiments with FDI algorithms and other multiple IMU software: gyrocompassing, calibration, and navigation. Gimbal flip is examined in light of its possible detrimental effects on FDI and navigation. For Vol. 3, see N74-10296.

  10. Reusable LH2 tank technology demonstration through ground test

    NASA Technical Reports Server (NTRS)

    Bianca, C.; Greenberg, H. S.; Johnson, S. E.

    1995-01-01

    The paper presents the project plan to demonstrate, by March 1997, the reusability of an integrated composite LH2 tank structure, cryogenic insulation, and thermal protection system (TPS). The plan includes establishment of design requirements and a comprehensive trade study to select the most suitable Reusable Hydrogen Composite Tank system (RHCTS) within the most suitable of 4 candidate structural configurations. The 4 vehicles are winged body with the capability to deliver 25,000 lbs of payload to a circular 220 nm, 51.6 degree inclined orbit (also 40,000 lbs to a 28.5 inclined 150 nm orbit). A prototype design of the selected RHCTS is established to identify the construction, fabrication, and stress simulation and test requirements necessary in an 8 foot diameter tank structure/insulation/TPS test article. A comprehensive development test program supports the 8 foot test article development and involves the composite tank itself, cryogenic insulation, and integrated tank/insulation/TPS designs. The 8 foot diameter tank will contain the integrated cryogenic insulation and TPS designs resulting from this development and that of the concurrent lightweight durable TPS program. Tank ground testing will include 330 cycles of LH2 filling, pressurization, body loading, depressurization, draining, and entry heating.

  11. SNL/SRNL Joint Project on degradation of mechanical properties in structural metals and welds for GTS reservoirs.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ronevich, Joseph Allen; Balch, Dorian K.; San Marchi, Christopher W.

    2015-12-01

    This project was intended to enable SNL-CA to produce appropriate specimens of relevant stainless steels for testing and perform baseline testing of weld heat-affected zone and weld fusion zone. One of the key deliverables in this project was to establish a procedure for fracture testing stainless steel weld fusion zone and heat affected zones that were pre-charged with hydrogen. Following the establishment of the procedure, a round robin was planned between SNL-CA and SRNL to ensure testing consistency between laboratories. SNL-CA and SRNL would then develop a comprehensive test plan, which would include tritium exposures of several years at SRNLmore » on samples delivered by SNL-CA. Testing would follow the procedures developed at SNL-CA. SRNL will also purchase tritium charging vessels to perform the tritium exposures. Although comprehensive understanding of isotope-induced fracture in GTS reservoir materials is a several year effort, the FY15 work would enabled us to jump-start the tests and initiate long-term tritium exposures to aid comprehensive future investigations. Development of a procedure and laboratory testing consistency between SNL-CA and SNRL ensures reliability in results as future evaluations are performed on aluminum alloys and potentially additively-manufactured components.« less

  12. Development and Application of Intelligence Tests for the Blind: A Research Utilization Conference. Final Report.

    ERIC Educational Resources Information Center

    Curtis, W. Scott

    The purpose of this project was to inquire into the current status of development, past use, availability, and future planning of intelligence tests for the visually handicapped in relation to the fields of psychological, educational, and vocational counseling. The project procedure was that of a research utilization conference involving the…

  13. The Development of the Mealings, Demuth, Dillon, and Buchholz Classroom Speech Perception Test

    ERIC Educational Resources Information Center

    Mealings, Kiri T.; Demuth, Katherine; Buchholz, Jörg; Dillon, Harvey

    2015-01-01

    Purpose: Open-plan classroom styles are increasingly being adopted in Australia despite evidence that their high intrusive noise levels adversely affect learning. The aim of this study was to develop a new Australian speech perception task (the Mealings, Demuth, Dillon, and Buchholz Classroom Speech Perception Test) and use it in an open-plan…

  14. Drilling, Completion, and Data Collection Plans An Assessment of Geological Carbon Sequestration Options in the Illinois Basin: Phase III

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Malkewicz, Nicholas; Kirksey, Jim; Finley, Robert

    2015-05-01

    Executive Summary The Illinois Basin – Decatur Project (IBDP) is managed by the Midwest Geological Sequestration Consortium (MGSC) and is led by the Illinois State Geological Survey (ISGS) at the University of Illinois. The project site is located on the Archer Daniels Midland Company (ADM) property in Decatur, Illinois, and is a fully integrated carbon capture and storage (CCS) project that uses CO₂ captured from the ethanol-producing fermentation process at the ADM corn-processing plant (Finley et. al., 2013). IBDP has a goal of injecting one million tonnes of CO₂ into the basal sands of the Mt. Simon Sandstone over amore » three-year period. This is a multifaceted project, and this report details the planning and results of the drilling, completions, well testing, log data acquisition, and the Health, Safety, and Environment (HSE) aspects of the project. Three deep wells were planned for the IBDP: • The injection well: Injection Well #1 (CCS1); • The monitoring well (both in-zone and above seal): Verification Well #1 (VW1); and • The geophone monitoring well: Geophysical Monitoring Well #1 (GM1). The detailed plans for these wells are attached to the appendices of this document. The wells were drilled successfully with little deviation from the original plans. The biggest change from the plan to execution was the need to adjust for larger-than-expected loss of circulation in the Potosi section of the Knox Formation. The completions reports also attached to this document detail the well constructions as they were actually built. Injectivity testing was carried out, and the perforating plans were adjusted based on the results. Additional perforations and acidizing were performed as a result of the injectivity testing. The testing plans are detailed in this report along with the actual testing results. The injectivity testing results were used in the modeling and simulation efforts. Detailed HSE plans were developed and implemented during the planning and execution phases of the project. The implementation included an HSE Bridging Document, which served to unify the HSE policies of the project partners and key subcontractors. The HSE plan and actual HSE results are presented in this document. There were no recordable HSE incidents during the project. A detailed logging program was developed based on project needs. The log data were acquired in accordance with the plan, and both the plan and log results are presented in this report. Log data were heavily utilized by the research staff, modelers, reservoir engineers, and for technical and permitting efforts. 5 Several key lessons were learned during the project: • Safety in operations and execution is paramount and is only achieved through proper planning and behavior control. The certainty of this was reinforced through implementation of this lesson and the resultant flawless HSE performance during the project. • Losses of drilling fluid circulation were larger than anticipated within the Potosi Formation. Circulation was only recovered through cementing the loss zones. • When possible, minimizing complexity in permit requirements and well designs is preferable. • The size of the wells were outside of the standard experience and expertise typical within the basin, and therefore required substantial planning and ramp-up of contractors and partners to meet project objectives. • With multiple stakeholders and research partners, establishing objectives and requirements early and adhering to change request procedures throughout the project are critical to manage competing data and sampling objectives that may be detrimental to overall progress. The well construction and completion operations were successfully executed, with all wells built in a manner that achieved excellent wellbore integrity. Log planning involved a number of stakeholders and technical specialists. Data collection from logging, coring, and testing was excellent. Time and effort spent with the associated contractors and suppliers to develop a well plan beyond normal scope proved highly successful, resulting in a well-construction and completion project that surpassed expectations. The world-class HSE results also demonstrate the commitment of all stakeholders in the project. The details follow in the body of this document« less

  15. Development Activities on Airbreathing Combined Cycle Engines

    NASA Technical Reports Server (NTRS)

    McArthur, J. Craig; Lyles, Garry (Technical Monitor)

    2000-01-01

    Contents include the following: Advanced reusable transportation(ART); aerojet and rocketdyne tests, RBCC focused concept flowpaths,fabricate flight weigh, test select components, document ART project, Istar (Integrated system test of an airbreathing rocket); combined cycle propulsion testbed;hydrocarbon demonstrator tracebility; Istar engine system and vehicle system closure study; and Istar project planning.

  16. The Role of Evaluation and Plans for Evaluating the Current Testing Program.

    ERIC Educational Resources Information Center

    Winters, Lynn

    The Palos Verdes Peninsula Unified School District Office of Program Evaluation and Research is responsible for providing information for program development and improvement; providing test information to special programs coordinators; and acting as a clearinghouse for all information concerning tests, evaluation methodology, and educational…

  17. Flight Flutter Testing of Supersonic Interceptors

    NASA Technical Reports Server (NTRS)

    Dublin, M.; Peller, R.

    1975-01-01

    A summary is presented of experiences in connection with flight flutter testing of supersonic interceptors. The planning and operational aspects involved are described along with the difficulties encountered, and the correlation between measurement and theory. Recommendations for future research and development to advance the science of flight flutter testing are included.

  18. 78 FR 21349 - Defense Advisory Committee on Military Personnel Testing; Notice of Federal Advisory Committee...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-10

    ... DEPARTMENT OF DEFENSE Office of the Secretary Defense Advisory Committee on Military Personnel... advisory committee meeting of the Defense Advisory Committee on Military Personnel Testing will take place... meeting is to review planned changes and progress in developing computerized tests for military enlistment...

  19. First evidence for "The backup plan paradox".

    PubMed

    Napolitano, Christopher M; Freund, Alexandra M

    2017-08-01

    This research is a first test of the backup plan paradox. We hypothesized that investing in a backup plan may facilitate the conditions that it was developed to address: Plan A's insufficiency. Five studies provide initial, primarily correlative support for the undermining effect of investing in a backup plan. Study 1 (n= 160) demonstrated that the more participants perceived they had invested in developing a backup plan (preparing a "crib sheet"), the more likely they were to use it, although greater investments were unrelated to backup plan utility. Studies 2-4 used a simulated negotiation task. Study 2 (n = 247) demonstrated that when goal-relevant resources are limited, investing in developing backup plans and perceiving them as highly instrumental can decrease goal performance through the indirect effect of increased means replacing. Study 3 (n = 248) replicated this effect when goal-relevant resources were plentiful. Study 4 (n = 204) used an experimental variant of the simulated negotiation task and demonstrated that simply having a backup plan is not detrimental, but perceiving backup plans to be highly instrumental decreased goal performance, again through the indirect effect of increased means replacing. Study 5 (n = 160) replicated findings from Studies 1-4 using a lab-based motor task (throwing a ball). Together, these results provide first evidence that backup plans can introduce costs that may jeopardize goal performance. (PsycINFO Database Record (c) 2017 APA, all rights reserved).

  20. Developing a Campaign Plan to Target Centers of Gravity Within Economic Systems

    DTIC Science & Technology

    1995-05-01

    Conclusion 67 CHAPTER 7: CURRENT AND FUTURE CONCERNS 69 Decision Making and Planning 69 Conclusion 72 CHAPTER 8: CONCLUSION 73 APPENDIX A: STATISTICS 80...Terminology and Statistical Tests 80 Country Analysis 84 APPENDIX B 154 BIBLIOGRAPHY 157 VITAE 162 IV LIST OF FIGURES Figure 1. Air Campaign...This project furthers the original statistical effort and adds to this a campaign planning approach (including both systems and operational level

  1. Inverter Ground Fault Overvoltage Testing

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hoke, Andy; Nelson, Austin; Chakraborty, Sudipta

    This report describes testing conducted at NREL to determine the duration and magnitude of transient overvoltages created by several commercial PV inverters during ground fault conditions. For this work, a test plan developed by the Forum on Inverter Grid Integration Issues (FIGII) has been implemented in a custom test setup at NREL. Load rejection overvoltage test results were reported previously in a separate technical report.

  2. Modular space station phase B extension program master plan

    NASA Technical Reports Server (NTRS)

    Munsey, E. H.

    1971-01-01

    The project is defined for design, development, fabrication, test, and pre-mission and mission operations of a shuttle-launched modular space station. The project management approach is described in terms of organization, management requirements, work breakdown structure, schedule, time-phased logic, implementation plans, manpower, and funding. The programmatic and technical problems are identified.

  3. Teachers and Technology: Development of an Extended Theory of Planned Behavior

    ERIC Educational Resources Information Center

    Teo, Timothy; Zhou, Mingming; Noyes, Jan

    2016-01-01

    This study tests the validity of an extended theory of planned behaviour (TPB) to explain teachers' intention to use technology for teaching and learning. Five hundred and ninety two participants completed a survey questionnaire measuring their responses to eight constructs which form an extended TPB. Using structural equation modelling, the…

  4. Design, fabrication, test, qualification and price analysis of third generation design solar cell modules. Part 1: Intermediate load module

    NASA Technical Reports Server (NTRS)

    Bottenberg, W. R.

    1981-01-01

    The updated program plan and narrative reflects the design and development work done and progress made in establishing a viable design for these modules. Design alterations from the preproduction plan are discussed based on experience gained during the preproduction phase of the program.

  5. Manpower Planning Criteria Manual, Construction Grants Section.

    ERIC Educational Resources Information Center

    Texas State Dept. of Water Resources, Austin.

    This document presents the material developed in conjunction with a project directed to test a methodology that a state water pollution control agency can use in determining its manpower and training needs. Included is a compilation of the manpower planning criteria used to relate numbers and types of personnel with deferred workloads. It also…

  6. Planning for Effective Security at Campus Special Events.

    ERIC Educational Resources Information Center

    Bromley, Max L.

    1984-01-01

    Factors to consider in assuring security for student events on campus are discussed, based on the experience of the University of South Florida, which has developed, tested, and critiqued a system of planning security. Even though special events vary significantly in type and purpose, some questions should be answered in advance, with the…

  7. Succeeding with Struggling Students: A Planning Resource for Raising Achievement

    ERIC Educational Resources Information Center

    Richardson, Marti T.

    2006-01-01

    Schools today are working harder than ever to help ensure that "all" children "can" learn and achieve high standards. Marti Richardson, a recognized leader in professional and curriculum development, delivers an innovative, classroom-tested program with planning tools to customize it for any school or district's data-based needs. Designed around a…

  8. What made Apollo a success?

    NASA Technical Reports Server (NTRS)

    1971-01-01

    Spacecraft development, mission design planning, flight crew operations, and flight operations are considered. Spacecraft design principles and test activities are described. Determination of the best series of flights leading to a lunar landing at the earliest possible time, flight planning, techniques for establishing flight procedures and carrying out flight operations, and crew training and simulation activities are discussed.

  9. Explaining Scientists' Plans for International Mobility from a Life Course Perspective

    ERIC Educational Resources Information Center

    Netz, Nicolai; Jaksztat, Steffen

    2017-01-01

    We identify factors influencing young scientists' plans for research stays abroad by embedding theories of social inequality, educational decision making, and migration into a life course framework. We test the developed model of international academic mobility by calculating a structural equation model using data from an online survey of…

  10. Inventorying national forest resources...for planning-programing-budgeting system

    Treesearch

    Miles R. Hill; Elliot L. Amidon

    1968-01-01

    New systems for analyzing resource management problems, such as Planning-Programing-Budgeting, will require automated procedures to collect and assemble resource inventory data. A computer - oriented system called Map Information Assembly and Display System developed for this purpose was tested on a National Forest in California. It provided information on eight forest...

  11. Action Planning and Recording Achievement.

    ERIC Educational Resources Information Center

    Green, Muriel

    This document examines strategies and procedures that British further education (FE) colleges can use to develop and enhance systems and structures for guiding and supporting learners and learning. It is based on the findings of a field test of the Managing Learning model for planning and recording the process of FE students. First, the importance…

  12. SU-F-BRA-12: End-User Oriented Tools and Procedures for Testing Brachytherapy TPSs Employing MBDCAs

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peppa, V; Pappas, E; Lahanas, V

    2015-06-15

    Purpose: To develop user-oriented tools for commissioning and dosimetry testing of {sup 192}Ir brachytherapy treatment planning systems (TPSs) employing model based dose calculation algorithms (MBDCAs). Methods: A software tool (BrachyGuide) has been developed for the automatic generation of MCNP6 input files from any CT based plan exported in DICOM RT format from Elekta and Varian TPSs. BrachyGuide also facilitates the evaluation of imported Monte Carlo (MC) and TPS dose distributions in terms of % dose differences and gamma index (CT overlaid colormaps or relative frequency plots) as well as DVHs and related indices. For users not equipped to perform MC,more » a set of computational models was prepared in DICOM format, accompanied by treatment plans and corresponding MCNP6 generated reference data. BrachyGuide can then be used to compare institutional and reference data as per TG186. The model set includes a water sphere with the MBDCA WG {sup 192}Ir source placed centrically and in two eccentric positions, a water sphere with cubic bone and lung inhomogeneities and a five source dwells plan, and a patient equivalent model with an Accelerated Partial Breast Irradiation (APBI) plan. Results: The tools developed were used for the dosimetry testing of the Acuros and ACE MBDCAs implemented in BrachyVision v.13 and Oncentra Brachy v.4.5, respectively. Findings were consistent with previous results in the literature. Besides points close to the source dwells, Acuros was found to agree within type A uncertainties with the reference MC results. Differences greater than MC type A uncertainty were observed for ACE at distances >5cm from the source dwells and in bone. Conclusion: The tools developed are efficient for brachytherapy MBDCA planning commissioning and testing. Since they are appropriate for distribution over the web, they will be put at the AAPM WG MBDCA’s disposal. Research co-financed by the ESF and Greek funds. NSRF operational Program: Education and Lifelong Learning Investing in Knowledge Society-Aristeia. Varian Medical Systems and Nucletron, an Elekta company provided access to TPSs for research purposes. Miss Peppa was supported by IKY-fellowships of excellence for postgraduate studies in Greece,Siemens Program.« less

  13. Plant growth modeling at the JSC variable pressure growth chamber - An application of experimental design

    NASA Technical Reports Server (NTRS)

    Miller, Adam M.; Edeen, Marybeth; Sirko, Robert J.

    1992-01-01

    This paper describes the approach and results of an effort to characterize plant growth under various environmental conditions at the Johnson Space Center variable pressure growth chamber. Using a field of applied mathematics and statistics known as design of experiments (DOE), we developed a test plan for varying environmental parameters during a lettuce growth experiment. The test plan was developed using a Box-Behnken approach to DOE. As a result of the experimental runs, we have developed empirical models of both the transpiration process and carbon dioxide assimilation for Waldman's Green lettuce over specified ranges of environmental parameters including carbon dioxide concentration, light intensity, dew-point temperature, and air velocity. This model also predicts transpiration and carbon dioxide assimilation for different ages of the plant canopy.

  14. The Intelligent Flight Control Program (IFCS)

    NASA Technical Reports Server (NTRS)

    2003-01-01

    Institute for Scientific Research, Inc. (ISR) is pleased to submit this closeout report for the Research Cooperative Agreement NCC4-00128 of accomplishments for the Intelligent Flight Control System (IFCS) Project. It has been a pleasure working with NASA and NASA partners as we strive to meet the goals of this research initiative. ISR was engaged in this Research Cooperative Agreement beginning March 3, 2001 and ending March 31, 2003. During this time, a great deal has been accomplished and plans have been solidified for the continued success of this program. Our primary areas of involvement include the following: 1) ARTS II Master Test Plan; 2) ARTS II Hardware Design and Development; 3) ARTS II Software Design and Development; 4) IFCS PID/BLNN/OLNN Development; 5) Performed Preliminary and Formal Testing; 6) Documentation and Reporting.

  15. SU-E-T-76: A Software System to Monitor VMAT Plan Complexity in a Large Radiotherapy Centre

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Arumugam, S; Xing, A; Ingham Institute, Sydney, NSW

    2015-06-15

    Purpose: To develop a system that analyses and reports the complexity of Volumetric Modulated Arc Therapy (VMAT) plans to aid in the decision making for streamlining patient specific dosimetric quality assurance (QA) tests. Methods: A software system, Delcheck, was developed in-house to calculate VMAT plan and delivery complexity using the treatment delivery file. Delcheck has the functionality to calculate multiple plan complexity metrics including the Li-Xing Modulation Index (LI-MI), multiplicative combination of Leaf Travel and Modulation Complexity Score (LTMCSv), Monitor Units per prescribed dose (MU/D) and the delivery complexity index (MIt) that incorporates the modulation of dose rate, leaf speedmore » and gantry speed. Delcheck includes database functionality to store and compare plan metrics for a specified treatment site. The overall plan and delivery complexity is assessed based on the 95% conformance limit of the complexity metrics as Similar, More or Less complex. The functionality of the software was tested using 42 prostate conventional, 10 prostate SBRT and 15 prostate bed VMAT plans generated for an Elekta linear accelerator. Results: The mean(σ) of LI-MI for conventional, SBRT and prostate bed plans were 1690(486), 3215.4(1294) and 3258(982) respectively. The LTMCSv of the studied categories were 0.334(0.05), 0.325(0.07) and 0.3112(0.09). The MU/D of the studied categories were 2.4(0.4), 2.7(0.7) and 2.5(0.5). The MIt of the studied categories were 21.6(3.4), 18.2(3.0) and 35.9(6.6). The values of the complexity metrics show that LI-MI appeared to resolve the plan complexity better than LTMCSv and MU/D. The MIt value increased as the delivery complexity increased. Conclusion: The developed software was shown to be working as expected. In studied treatment categories Prostate bed plans are more complex in both plan and delivery and SBRT is more complex in plan and less complex in delivery as demonstrated by LI-MI and MIt. This project was funded through a Cancer Council NSW Project Grant (RG14-11)« less

  16. MHD program plan, FY 1991

    NASA Astrophysics Data System (ADS)

    1990-10-01

    The current magnetohydrodynamic MHD program being implemented is a result of a consensus established in public meetings held by the Department of Energy in 1984. The public meetings were followed by the formulation of a June 1984 Coal-Fired MHD Preliminary Transition and Program Plan. This plan focused on demonstrating the proof-of-concept (POC) of coal-fired MHD electric power plants by the early 1990s. MHD test data indicate that while there are no fundamental technical barriers impeding the development of MHD power plants, technical risk remains. To reduce the technical risk three key subsystems (topping cycle, bottoming cycle, and seed regeneration) are being assembled and tested separately. The program does not require fabrication of a complete superconducting magnet, but rather the development and testing of superconductor cables. The topping cycle system test objectives can be achieved using a conventional iron core magnet system already in place at a DOE facility. Systems engineering-derived requirements and analytical modeling to support scale-up and component design guide the program. In response to environmental, economic, engineering, and utility acceptance requirements, design choices and operating modes are tested and refined to provide technical specifications for meeting commercial criteria. These engineering activities are supported by comprehensive and continuing systems analyses to establish realistic technical requirements and cost data. Essential elements of the current program are to: develop technical and environmental data for the integrated MHD topping cycle and bottoming cycle systems through POC testing (1000 and 4000 hours, respectively); design, construct, and operate a POC seed regeneration system capable of processing spent seed materials from the MHD bottoming cycle; prepare conceptual designs for a site specific MHD retrofit plant; and continue supporting research necessary for system testing.

  17. Development and implementation of the compensation plan for pharmacy services in Alberta, Canada.

    PubMed

    Breault, Rene R; Whissell, Jeff G; Hughes, Christine A; Schindel, Theresa J

    To describe experiences with development and implementation of a compensation plan for pharmacy services delivered by pharmacists in community pharmacies. Community pharmacy practice in Alberta, Canada. Pharmacists in Alberta have one of the most progressive scopes of practice in North America. They have authority to prescribe drugs independently, administer drugs by injection, access electronic health records, and order laboratory tests. A publicly funded compensation plan for pharmacy services was implemented in 2012. Principles that guided development of the compensation plan aimed to 1) ensure payment for pharmacy services, 2) support pharmacists in using their full scope of practice, 3) enable the development of long-term relationships with patients, 4) facilitate expansion of services delivered by pharmacists, and 5) provide access to pharmacy services for all eligible Albertans. Services covered by the compensation plan include care planning, prescribing, and administering drugs by injection. The guiding principles were used to evaluate experiences with the compensation plan. Claims for pharmacy services covered by the compensation plan increased from 30,000 per month in July 2012 to 170,000 per month in March 2016. From September 2015 to August 2016, 1226 pharmacies submitted claims for services provided by 3901 pharmacists. The number of pharmacists with authorization to prescribe and administer injections continued to increase following implementation of the plan. Alberta's experiences with the development and implementation of the compensation plan will be of interest to jurisdictions considering implementation of remunerated pharmacy services. The potential impact of the plan on health and economic outcomes, in addition to the value of the services as perceived by the public, patients, pharmacists, and other health care providers, should also be explored. Crown Copyright © 2017. Published by Elsevier Inc. All rights reserved.

  18. Vector-model-supported approach in prostate plan optimization

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Liu, Eva Sau Fan; Department of Health Technology and Informatics, The Hong Kong Polytechnic University; Wu, Vincent Wing Cheung

    Lengthy time consumed in traditional manual plan optimization can limit the use of step-and-shoot intensity-modulated radiotherapy/volumetric-modulated radiotherapy (S&S IMRT/VMAT). A vector model base, retrieving similar radiotherapy cases, was developed with respect to the structural and physiologic features extracted from the Digital Imaging and Communications in Medicine (DICOM) files. Planning parameters were retrieved from the selected similar reference case and applied to the test case to bypass the gradual adjustment of planning parameters. Therefore, the planning time spent on the traditional trial-and-error manual optimization approach in the beginning of optimization could be reduced. Each S&S IMRT/VMAT prostate reference database comprised 100more » previously treated cases. Prostate cases were replanned with both traditional optimization and vector-model-supported optimization based on the oncologists' clinical dose prescriptions. A total of 360 plans, which consisted of 30 cases of S&S IMRT, 30 cases of 1-arc VMAT, and 30 cases of 2-arc VMAT plans including first optimization and final optimization with/without vector-model-supported optimization, were compared using the 2-sided t-test and paired Wilcoxon signed rank test, with a significance level of 0.05 and a false discovery rate of less than 0.05. For S&S IMRT, 1-arc VMAT, and 2-arc VMAT prostate plans, there was a significant reduction in the planning time and iteration with vector-model-supported optimization by almost 50%. When the first optimization plans were compared, 2-arc VMAT prostate plans had better plan quality than 1-arc VMAT plans. The volume receiving 35 Gy in the femoral head for 2-arc VMAT plans was reduced with the vector-model-supported optimization compared with the traditional manual optimization approach. Otherwise, the quality of plans from both approaches was comparable. Vector-model-supported optimization was shown to offer much shortened planning time and iteration number without compromising the plan quality.« less

  19. In-Pile Tests for IASCC Growth Behavior of Irradiated 316L Stainless Steel under Simulated BWR Condition in JMTR

    NASA Astrophysics Data System (ADS)

    Chimi, Yasuhiro; Kasahara, Shigeki; Ise, Hideo; Kawaguchi, Yoshihiko; Nakano, Junichi; Nishiyama, Yutaka

    The Japan Atomic Energy Agency (JAEA) has an in-pile irradiation test plan to evaluate in-situ effects of neutron/γ-ray irradiation on stress corrosion crack (SCC) growth of irradiated stainless steels using the Japan Materials Testing Reactor (JMTR). SCC growth rate and its dependence on electrochemical corrosion potential (ECP) are different between in-pile test and post irradiation examination (PIE). These differences are not fully understood because of a lack of in-pile data. This paper presents a systematic review on SCC growth data of irradiated stainless steels, an in-pile test plan for crack growth of irradiated SUS316L stainless steel under simulated BWR conditions in the JMTR, and the development of the in-pile test techniques.

  20. Automated replication of cone beam CT-guided treatments in the Pinnacle(3) treatment planning system for adaptive radiotherapy.

    PubMed

    Hargrave, Catriona; Mason, Nicole; Guidi, Robyn; Miller, Julie-Anne; Becker, Jillian; Moores, Matthew; Mengersen, Kerrie; Poulsen, Michael; Harden, Fiona

    2016-03-01

    Time-consuming manual methods have been required to register cone-beam computed tomography (CBCT) images with plans in the Pinnacle(3) treatment planning system in order to replicate delivered treatments for adaptive radiotherapy. These methods rely on fiducial marker (FM) placement during CBCT acquisition or the image mid-point to localise the image isocentre. A quality assurance study was conducted to validate an automated CBCT-plan registration method utilising the Digital Imaging and Communications in Medicine (DICOM) Structure Set (RS) and Spatial Registration (RE) files created during online image-guided radiotherapy (IGRT). CBCTs of a phantom were acquired with FMs and predetermined setup errors using various online IGRT workflows. The CBCTs, DICOM RS and RE files were imported into Pinnacle(3) plans of the phantom and the resulting automated CBCT-plan registrations were compared to existing manual methods. A clinical protocol for the automated method was subsequently developed and tested retrospectively using CBCTs and plans for six bladder patients. The automated CBCT-plan registration method was successfully applied to thirty-four phantom CBCT images acquired with an online 0 mm action level workflow. Ten CBCTs acquired with other IGRT workflows required manual workarounds. This was addressed during the development and testing of the clinical protocol using twenty-eight patient CBCTs. The automated CBCT-plan registrations were instantaneous, replicating delivered treatments in Pinnacle(3) with errors of ±0.5 mm. These errors were comparable to mid-point-dependant manual registrations but superior to FM-dependant manual registrations. The automated CBCT-plan registration method quickly and reliably replicates delivered treatments in Pinnacle(3) for adaptive radiotherapy.

  1. Fuel Subsystems Flight Test Handbook

    DTIC Science & Technology

    1981-12-01

    described in Flight and Maintenance Manuals and as it exists in hardware form. These versions may differ significantly in the development phase of a new ...Canter (AFFPTC), Edwards AFB, California. The work was done under the authority of the Study Plan for Development of a Handbook for Aircraft Fuel...10 Position of AFFTC in the Development and 10 Evaluation Process Agencies Involved 11 Multi-Purpose Flight Tests 11 FUEL SYSTEM FUNCTIONS AND

  2. Shuttle payload vibroacoustic test plan evaluation

    NASA Technical Reports Server (NTRS)

    Stahle, C. V.; Gongloff, H. R.; Young, J. P.; Keegan, W. B.

    1977-01-01

    Statistical decision theory is used to evaluate seven alternate vibro-acoustic test plans for Space Shuttle payloads; test plans include component, subassembly and payload testing and combinations of component and assembly testing. The optimum test levels and the expected cost are determined for each test plan. By including all of the direct cost associated with each test plan and the probabilistic costs due to ground test and flight failures, the test plans which minimize project cost are determined. The lowest cost approach eliminates component testing and maintains flight vibration reliability by performing subassembly tests at a relatively high acoustic level.

  3. Environmental control medical support team

    NASA Technical Reports Server (NTRS)

    Crump, William J.; Kilgore, Melvin V., Jr.

    1988-01-01

    The activities conducted in support of the Environmental Control and Life Support Team during December 7, 1987 through September 30, 1988 are summarized. The majority of the ongoing support has focused on the ECLSS area. Through a series of initial meetings with the ECLSS team and technical literature review, an initial list of critical topics was developed. Subtasks were then identified or additional related tasks received as action items from the ECLSS group meetings. Although most of the efforts focused on providing MSFC personnel with information regarding specific questions and problems related to ECLSS issues, other efforts regarding identifying an ECLSS Medical Support Team and constructing data bases of technical information were also initiated and completed. The specific tasks are as follows: (1) Provide support to the mechanical design and integration of test systems as related to microbiological concerns; (2) Assist with design of Human Subjects Test Protocols; (3) Interpretation and recommendations pertaining to air/water quality requirements; (4) Assist in determining the design specifications required as related to the Technical Demonstration Program; (5) Develop a data base of all microorganisms recovered from previous subsystem testing; (6) Estimates of health risk of individual microbes to test subjects; (7) Assist with setting limits for safety of test subjects; (8) Health monitoring of test subjects; (9) Assist in the preparation of test plans; (10) Assist in the development of a QA/QC program to assure the validity, accuracy and precision of the analyses; and (11) Assist in developing test plans required for future man in the loop testing.

  4. Summary of NR Program Prometheus Efforts

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    J Ashcroft; C Eshelman

    2006-02-08

    The Naval Reactors Program led work on the development of a reactor plant system for the Prometheus space reactor program. The work centered on a 200 kWe electric reactor plant with a 15-20 year mission applicable to nuclear electric propulsion (NEP). After a review of all reactor and energy conversion alternatives, a direct gas Brayton reactor plant was selected for further development. The work performed subsequent to this selection included preliminary nuclear reactor and reactor plant design, development of instrumentation and control techniques, modeling reactor plant operational features, development and testing of core and plant material options, and development ofmore » an overall project plan. Prior to restructuring of the program, substantial progress had been made on defining reference plant operating conditions, defining reactor mechanical, thermal and nuclear performance, understanding the capabilities and uncertainties provided by material alternatives, and planning non-nuclear and nuclear system testing. The mission requirements for the envisioned NEP missions cannot be accommodated with existing reactor technologies. Therefore concurrent design, development and testing would be needed to deliver a functional reactor system. Fuel and material performance beyond the current state of the art is needed. There is very little national infrastructure available for fast reactor nuclear testing and associated materials development and testing. Surface mission requirements may be different enough to warrant different reactor design approaches and development of a generic multi-purpose reactor requires substantial sacrifice in performance capability for each mission.« less

  5. The Assessment, Development, Assurance Pharmacist's Tool (ADAPT) for ensuring quality implementation of health promotion programs.

    PubMed

    Truong, Hoai-An; Taylor, Catherine R; DiPietro, Natalie A

    2012-02-10

    To develop and validate the Assessment, Development, Assurance Pharmacist's Tool (ADAPT), an instrument for pharmacists and student pharmacists to use in developing and implementing health promotion programs. The 36-item ADAPT instrument was developed using the framework of public health's 3 core functions (assessment, policy development, and assurance) and 10 essential services. The tool's content and usage was assessed and conducted through peer-review and initial validity testing processes. Over 20 faculty members, preceptors, and student pharmacists at 5 institutions involved in planning and implementing health promotion initiatives reviewed the instrument and conducted validity testing. The instrument took approximately 15 minutes to complete and the findings resulted in changes and improvements to elements of the programs evaluated. The ADAPT instrument fills a need to more effectively plan, develop, implement, and evaluate pharmacist-directed public health programs that are evidence-based, high-quality, and compliant with laws and regulations and facilitates documentation of pharmacists' contributions to public health.

  6. Improving the primary school science learning unit about force and motion through lesson study

    NASA Astrophysics Data System (ADS)

    Phaikhumnam, Wuttichai; Yuenyong, Chokchai

    2018-01-01

    The study aimed to develop primary school science lesson plan based on inquiry cycle (5Es) through lesson study. The study focused on the development of 4 primary school science lesson plans of force and motion for Grade 3 students in KKU Demonstration Primary School (Suksasart), first semester of 2015 academic year. The methodology is mixed method. The Inthaprasitha (2010) lesson study cycle was implemented in group of KKU Demonstration Primary School. Instruments of reflection of lesson plan developing included participant observation, meeting and reflection report, lesson plan and other document. The instruments of examining students' learning include classroom observation and achievement test. Data was categorized from these instruments to find the issues of changing and improving the good lesson plan of Thai primary school science learning. The findings revealed that teachers could develop the lesson plans through lesson study. The issues of changing and improving were disused by considering on engaging students related to societal issues, students' prior knowledge, scientific concepts for primary school students, and what they learned from their changing. It indicated that the Lesson Study allowed primary school science teachers to share ideas and develop ideas to improve the lesson. The study may have implications for Thai science teacher education through Lesson Study.

  7. VMAT linear accelerator commissioning and quality assurance: dose control and gantry speed tests

    PubMed Central

    Rowshanfarzad, Pejman; Greer, Peter B.

    2016-01-01

    In VMAT treatment delivery the ability of the linear accelerator (linac) to accurately control dose versus gantry angle is critical to delivering the plan correctly. A new VMAT test delivery was developed to specifically test the dose versus gantry angle with the full range of allowed gantry speeds and dose rates. The gantry‐mounted IBA MatriXX with attached inclinometer was used in movie mode to measure the instantaneous relative dose versus gantry angle during the plan every 0.54 s. The results were compared to the expected relative dose at each gantry angle calculated from the plan. The same dataset was also used to compare the instantaneous gantry speeds throughout the delivery compared to the expected gantry speeds from the plan. Measurements performed across four linacs generally show agreement between measurement and plan to within 1.5% in the constant dose rate regions and dose rate modulation within 0.1 s of the plan. Instantaneous gantry speed was measured to be within 0.11∘/s of the plan (1 SD). An error in one linac was detected in that the nominal gantry speed was incorrectly calibrated. This test provides a practical method to quality‐assure critical aspects of VMAT delivery including dose versus gantry angle and gantry speed control. The method can be performed with any detector that can acquire time‐resolved dosimetric information that can be synchronized with a measurement of gantry angle. The test fulfils several of the aims of the recent Netherlands Commission on Radiation Dosimetry (NCS) Report 24, which provides recommendations for comprehensive VMAT quality assurance. PACS number(s): 87.55.Qr PMID:27167282

  8. Final Report for X-ray Diffraction Sample Preparation Method Development

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ely, T. M.; Meznarich, H. K.; Valero, T.

    WRPS-1500790, “X-ray Diffraction Saltcake Sample Preparation Method Development Plan/Procedure,” was originally prepared with the intent of improving the specimen preparation methodology used to generate saltcake specimens suitable for XRD-based solid phase characterization. At the time that this test plan document was originally developed, packed powder in cavity supports with collodion binder was the established XRD specimen preparation method. An alternate specimen preparation method less vulnerable, if not completely invulnerable to preferred orientation effects, was desired as a replacement for the method.

  9. The ITER bolometer diagnostic: Status and plansa)

    NASA Astrophysics Data System (ADS)

    Meister, H.; Giannone, L.; Horton, L. D.; Raupp, G.; Zeidner, W.; Grunda, G.; Kalvin, S.; Fischer, U.; Serikov, A.; Stickel, S.; Reichle, R.

    2008-10-01

    A consortium consisting of four EURATOM Associations has been set up to develop the project plan for the full development of the ITER bolometer diagnostic and to continue urgent R&D activities. An overview of the current status is given, including detector development, line-of-sight optimization, performance analysis as well as the design of the diagnostic components and their integration in ITER. This is complemented by the presentation of plans for future activities required to successfully implement the bolometer diagnostic, ranging from the detector development over diagnostic design and prototype testing to RH tools for calibration.

  10. Railroad Redevelopment Planning.

    DTIC Science & Technology

    1981-01-01

    TEST CHART4A IONAL BUREAU’ Of STANDARDS- 1963-A -- m-ma REDQEVELcOPMENT PLANNIING *p W44 it -- 8 UNVRSITY OF C@O RAOO AT GENVER Tis docmr bpf Cr)o~d...officials began work on a set of guidelines in order to have some form of planned development u versus a piecemeal approach. According to a city...place. The city worked closely with various developers and their architects on the guidelines and the resulting ordinance was generally acceptable to

  11. CMC Research at NASA Glenn in 2014: Recent Progress and Plans

    NASA Technical Reports Server (NTRS)

    Grady, Joseph E.

    2014-01-01

    As part of NASA's Aeronautical Sciences project, Glenn Research Center has developed advanced fiber and matrix constituents for a 2700F CMC for turbine engine applications. Fiber, matrix and CMC development activities will be reviewed and the improvements in the properties and durability of each will be summarized. Plans for 2014 will be summarized, including fabrication and durability testing of the 2700F CMC and status updates on research collaborations underway with AFRL and DOE

  12. Shuttle environmental and thermal control/life support system computer program, supplement 1

    NASA Technical Reports Server (NTRS)

    Ayotte, W. J.

    1975-01-01

    The computer programs developed to simulate the RSECS (Representative Shuttle Environmental Control System) were described. These programs were prepared to provide pretest predictions, post-test analysis and real time problem analysis for RSECS test planning and evaluation.

  13. A Peer Counselling Program for Persons Testing H.I.V. Antibody Positive.

    ERIC Educational Resources Information Center

    Baiss, Alan

    1989-01-01

    Describes need for and development of a peer counseling program for persons who have tested positive for human immunodeficiency virus (HIV) antibodies. Discusses selection of peer counselors, training, and confidentiality. Includes discussion of future plans. (ABL)

  14. GENERIC VERIFICATION PROTOCOL FOR AQUEOUS CLEANER RECYCLING TECHNOLOGIES

    EPA Science Inventory

    This generic verification protocol has been structured based on a format developed for ETV-MF projects. This document describes the intended approach and explain plans for testing with respect to areas such as test methodology, procedures, parameters, and instrumentation. Also ...

  15. 12 CFR 228.28 - Assigned ratings.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... bank's performance under the lending, investment and service tests, the community development test, the small bank performance standards, or an approved strategic plan, as applicable. (b) Lending, investment... credit practices. (1) The Board's evaluation of a bank's CRA performance is adversely affected by...

  16. Measuring pregnancy planning: A psychometric evaluation and comparison of two scales.

    PubMed

    Drevin, Jennifer; Kristiansson, Per; Stern, Jenny; Rosenblad, Andreas

    2017-11-01

    To psychometrically test the London Measure of Unplanned Pregnancy and compare it with the Swedish Pregnancy Planning Scale. The incidence of unplanned pregnancies is an important indicator of reproductive health. The London Measure of Unplanned Pregnancy measures pregnancy planning by taking contraceptive use, timing, intention to become pregnant, desire for pregnancy, partner agreement, and pre-conceptual preparations into account. It has, however, previously not been psychometrically evaluated using confirmatory factor analysis. The Likert-scored single-item Swedish Pregnancy Planning Scale has been developed to measure the woman's own view of pregnancy planning level. Cross-sectional design. In 2012-2013, 5493 pregnant women living in Sweden were invited to participate in the Swedish Pregnancy Planning study, of whom 3327 (61%) agreed to participate and answered a questionnaire. A test-retest pilot study was conducted in 2011-2012. Thirty-two participants responded to the questionnaire on two occasions 14 days apart. Data were analysed using confirmatory factor analysis, Cohen's weighted kappa and Spearman's correlation. All items of the London Measure of Unplanned Pregnancy contributed to measuring pregnancy planning, but four items had low item-reliability. The London Measure of Unplanned Pregnancy and Swedish Pregnancy Planning Scale corresponded reasonably well with each other and both showed good test-retest reliability. The London Measure of Unplanned Pregnancy may benefit from item reduction and its usefulness may be questioned. The Swedish Pregnancy Planning Scale is time-efficient and shows acceptable reliability and construct validity, which makes it more useful for measuring pregnancy planning. © 2017 John Wiley & Sons Ltd.

  17. Test Plan for the Technology Maturation of Supersonic Inflatable Aerodynamic Decelerators

    NASA Technical Reports Server (NTRS)

    Kelly, Jenny R.; Cruz, Juan R.

    2009-01-01

    Supersonic inflatable aerodynamic decelerators (IADs) are drag devices intended to be deployed at high Mach numbers. In the application considered here they assist in the descent and landing of spacecraft on Mars. Although promising, present IAD technology is not yet sufficiently mature for use in the near future. This paper describes a technology maturation plan for tension cone IADs using subscale test articles to reduce development costs. As envisioned, the proposed test plan includes three phases: wind tunnel tests (subsonic), unpowered high-altitude flight tests (transonic), and powered high-altitude tests (supersonic). This test plan is based on a building block approach in which successful completion of each phase adds to the understanding of the behavior of IADs and reduces the risk of the subsequent, more expensive phases. By properly scaling the IADs, test articles of the same size and nearly the same construction can be used for all three phases. The final phase is a dynamically scaled flight test with IAD deployment at the same Mach number as the full-scale vehicle on Mars. Two full-scale example cases are presented: one for a single-stage system (15 m dia. IAD to subsonic retropropulsion), and another for a two-stage system (10.5 m dia. IAD to subsonic parachute). Using scale factors of 0.333 and 0.476 yield subscale test IADs of 5 m dia. The dynamically scaled powered flight test starts at Mach 4 and an altitude of 33.5 km. Existing balloons and rocket motors are shown to be adequate to meet the required test conditions.

  18. Final Report - ILAW PCT, VHT, Viscosity, and Electrical Conductivity Model Development, VSL-07R1230-1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kruger, Albert A.; Cooley, S. K.; Joseph, I.

    This report describes the results of work and testing specified by the Test Specifications (24590-LAW-TSP-RT-01-013 Rev.1 and 24590-WTP-TSP-RT-02-001 Rev.0), Test Plans (VSL-02T4800-1 Rev.1 & TP-RPP-WTP-179 Rev.1), and Text Exception (24590-WTP-TEF-RT-03-040). The work and any associated testing followed established quality assurance requirements and conducted as authorized. The descriptions provided in this test report are an accurate account of both the conduct of the work and the data collected. Results required by the Test Plans are reported. Also reported are any unusual or anomalous occurrences that are different from the starting hypotheses. The test results and this report have been reviewed andmore » verified.« less

  19. A study on the utilization of advanced composites in commercial aircraft wing structure

    NASA Technical Reports Server (NTRS)

    Watts, D. J.

    1978-01-01

    A study was conducted to define the technology and data needed to support the introduction of advanced composite materials in the wing structure of future production aircraft. The study accomplished the following: (1) definition of acceptance factors, (2) identification of technology issues, (3) evaluation of six candidate wing structures, (4) evaluation of five program options, (5) definition of a composite wing technology development plan, (6) identification of full-scale tests, (7) estimation of program costs for the total development plan, (8) forecast of future utilization of composites in commercial transport aircraft and (9) identification of critical technologies for timely program planning.

  20. Assessment of urban pluvial flood risk and efficiency of adaptation options through simulations - A new generation of urban planning tools

    NASA Astrophysics Data System (ADS)

    Löwe, Roland; Urich, Christian; Sto. Domingo, Nina; Mark, Ole; Deletic, Ana; Arnbjerg-Nielsen, Karsten

    2017-07-01

    We present a new framework for flexible testing of flood risk adaptation strategies in a variety of urban development and climate scenarios. This framework couples the 1D-2D hydrodynamic simulation package MIKE FLOOD with the agent-based urban development model DAnCE4Water and provides the possibility to systematically test various flood risk adaptation measures ranging from large infrastructure changes over decentralised water management to urban planning policies. We have tested the framework in a case study in Melbourne, Australia considering 9 scenarios for urban development and climate and 32 potential combinations of flood adaptation measures. We found that the performance of adaptation measures strongly depended on the considered climate and urban development scenario and the other implementation measures implemented, suggesting that adaptive strategies are preferable over one-off investments. Urban planning policies proved to be an efficient means for the reduction of flood risk, while implementing property buyback and pipe increases in a guideline-oriented manner was too costly. Random variations in location and time point of urban development could have significant impact on flood risk and would in some cases outweigh the benefits of less efficient adaptation strategies. The results of our setup can serve as an input for robust decision making frameworks and thus support the identification of flood risk adaptation measures that are economically efficient and robust to variations of climate and urban layout.

  1. Integrated Toolset for WSN Application Planning, Development, Commissioning and Maintenance: The WSN-DPCM ARTEMIS-JU Project.

    PubMed

    Antonopoulos, Christos; Asimogloy, Katerina; Chiti, Sarah; D'Onofrio, Luca; Gianfranceschi, Simone; He, Danping; Iodice, Antonio; Koubias, Stavros; Koulamas, Christos; Lavagno, Luciano; Lazarescu, Mihai T; Mujica, Gabriel; Papadopoulos, George; Portilla, Jorge; Redondo, Luis; Riccio, Daniele; Riesgo, Teresa; Rodriguez, Daniel; Ruello, Giuseppe; Samoladas, Vasilis; Stoyanova, Tsenka; Touliatos, Gerasimos; Valvo, Angela; Vlahoy, Georgia

    2016-06-02

    In this article we present the main results obtained in the ARTEMIS-JU WSN-DPCM project between October 2011 and September 2015. The first objective of the project was the development of an integrated toolset for Wireless sensor networks (WSN) application planning, development, commissioning and maintenance, which aims to support application domain experts, with limited WSN expertise, to efficiently develop WSN applications from planning to lifetime maintenance. The toolset is made of three main tools: one for planning, one for application development and simulation (which can include hardware nodes), and one for network commissioning and lifetime maintenance. The tools are integrated in a single platform which promotes software reuse by automatically selecting suitable library components for application synthesis and the abstraction of the underlying architecture through the use of a middleware layer. The second objective of the project was to test the effectiveness of the toolset for the development of two case studies in different domains, one for detecting the occupancy state of parking lots and one for monitoring air concentration of harmful gasses near an industrial site.

  2. Integrated Toolset for WSN Application Planning, Development, Commissioning and Maintenance: The WSN-DPCM ARTEMIS-JU Project

    PubMed Central

    Antonopoulos, Christos; Asimogloy, Katerina; Chiti, Sarah; D’Onofrio, Luca; Gianfranceschi, Simone; He, Danping; Iodice, Antonio; Koubias, Stavros; Koulamas, Christos; Lavagno, Luciano; Lazarescu, Mihai T.; Mujica, Gabriel; Papadopoulos, George; Portilla, Jorge; Redondo, Luis; Riccio, Daniele; Riesgo, Teresa; Rodriguez, Daniel; Ruello, Giuseppe; Samoladas, Vasilis; Stoyanova, Tsenka; Touliatos, Gerasimos; Valvo, Angela; Vlahoy, Georgia

    2016-01-01

    In this article we present the main results obtained in the ARTEMIS-JU WSN-DPCM project between October 2011 and September 2015. The first objective of the project was the development of an integrated toolset for Wireless sensor networks (WSN) application planning, development, commissioning and maintenance, which aims to support application domain experts, with limited WSN expertise, to efficiently develop WSN applications from planning to lifetime maintenance. The toolset is made of three main tools: one for planning, one for application development and simulation (which can include hardware nodes), and one for network commissioning and lifetime maintenance. The tools are integrated in a single platform which promotes software reuse by automatically selecting suitable library components for application synthesis and the abstraction of the underlying architecture through the use of a middleware layer. The second objective of the project was to test the effectiveness of the toolset for the development of two case studies in different domains, one for detecting the occupancy state of parking lots and one for monitoring air concentration of harmful gasses near an industrial site. PMID:27271622

  3. Advanced on-site power plant development technology program

    NASA Technical Reports Server (NTRS)

    Kemp, F. S.

    1985-01-01

    A 30-cell stack was tested for 7200 hours. At 6000 hours the stack was successfully refilled with acid with no loss of performance. A second stack containing the advanced Configuration B cell package was fabricated and assembled for testing in 1985. A 200-kW brassboard inverter was successfully evaluated, verifying the design of the two-bridge ASCR circuit design. A fuel processing catalyst train was tested for 2000 hours verifying the catalyst for use in a 200-kW development reformer. The development reformer was fabricated for evaluation in 1985. The initial test plan was prepared for a 200-kW verification test article.

  4. Development of an outcome measurement system for service planning for children and youth with special needs

    PubMed Central

    Kertoy, M K; Russell, D J; Rosenbaum, P; Jaffer, S; Law, M; McCauley, D; Gorter, J W

    2013-01-01

    Aim This study described the process used in developing an outcome measurement framework for system planning to improve services for children and youth with special needs and their families in a Canadian province. The study reports the results of several parent-completed measures, which would be useful in service planning as well as the acceptability and utility of these measures for use by families and service centres. Methods/results Development of a theoretical framework, consultation with key stakeholders, testing the utility of selected outcome measures and initial dissemination of results were critical elements in the successful development of an outcome system. Consultation with stakeholders confirmed use of the International Classification of Functioning, Disability and Health and the child-within-family-within community model as theoretical frameworks while building valuable partnerships and identifying potential barriers to implementation. Pilot testing showed three outcome measures were feasible for families to complete and the measures provided information about services for children that was valuable to families as well as service providers. Gaps in service delivery were identified and the need for better communication between service providers and communities to facilitate integrated services was highlighted. Conclusion The findings from this study can be used to implement an outcome measurement system for children with special needs and may serve as a resource for international researchers who are working to develop valid tools as well as outcome systems that are useful for system planning. PMID:22845889

  5. Testing Devices Garner Data on Insulation Performance

    NASA Technical Reports Server (NTRS)

    2014-01-01

    To develop a test instrument that could garner measurements of the thermal performance of insulation under extreme conditions, researchers at Kennedy Space Center devised the Cryostat 1 and then Cryostat 2. McLean, Virginia-based QinetiQ North America licensed the technology and plans to market it to organizations developing materials for things like piping and storage tank insulation, refrigeration, appliances, and consumer goods.

  6. Secondary Waste Simulant Development for Cast Stone Formulation Testing

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Russell, Renee L.; Westsik, Joseph H.; Rinehart, Donald E.

    Washington River Protection Solutions, LLC (WRPS) funded Pacific Northwest National Laboratory (PNNL) to conduct a waste form testing program to implement aspects of the Secondary Liquid Waste Treatment Cast Stone Technology Development Plan (Ashley 2012) and the Hanford Site Secondary Waste Roadmap (PNNL 2009) related to the development and qualification of Cast Stone as a potential waste form for the solidification of aqueous wastes from the Hanford Site after the aqueous wastes are treated at the Effluent Treatment Facility (ETF). The current baseline is that the resultant Cast Stone (or grout) solid waste forms would be disposed at the Integratedmore » Disposal Facility (IDF). Data and results of this testing program will be used in the upcoming performance assessment of the IDF and in the design and operation of a solidification treatment unit planned to be added to the ETF. The purpose of the work described in this report is to 1) develop simulants for the waste streams that are currently being fed and future WTP secondary waste streams also to be fed into the ETF and 2) prepare simulants to use for preparation of grout or Cast Stone solid waste forms for testing.« less

  7. Servicers system demonstration plan and capability development

    NASA Technical Reports Server (NTRS)

    Bulboaca, M. A.; Cuseo, J. A.; Derocher, W. L., Jr.; Maples, R. W.; Reynolds, P. C.; Sterrett, R. A.

    1985-01-01

    A plan for the demonstration of the exchange of Multi-Mission Modular Spacecraft (MMS) modules using the servicer mechanism Engineering Test Unit (ETU) was prepared and executed. The plan included: establishment of requirements, conceptual design, selection of MMS spacecraft mockup configuration, selection of MMS module mockup configuration, evaluation of adequacy of ETU load capability, and selection of a stowage rack arrangement. The MMS module exchange demonstration mockup equipment was designed, fabricated, checked out, shipped, installed, and demonstrated.

  8. A manned maneuvering unit proximity operations planning and flight guidance display and control system

    NASA Technical Reports Server (NTRS)

    Gershzohn, Gary R.; Sirko, Robert J.; Zimmerman, K.; Jones, A. D.

    1990-01-01

    This task concerns the design, development, testing, and evaluation of a new proximity operations planning and flight guidance display and control system for manned space operations. A forecast, derivative manned maneuvering unit (MMU) was identified as a candidate for the application of a color, highway-in-the-sky display format for the presentation of flight guidance information. A silicon graphics 4D/20-based simulation is being developed to design and test display formats and operations concepts. The simulation includes the following: (1) real-time color graphics generation to provide realistic, dynamic flight guidance displays and control characteristics; (2) real-time graphics generation of spacecraft trajectories; (3) MMU flight dynamics and control characteristics; (4) control algorithms for rotational and translational hand controllers; (5) orbital mechanics effects for rendezvous and chase spacecraft; (6) inclusion of appropriate navigation aids; and (7) measurement of subject performance. The flight planning system under development provides for: (1) selection of appropriate operational modes, including minimum cost, optimum cost, minimum time, and specified ETA; (2) automatic calculation of rendezvous trajectories, en route times, and fuel requirements; (3) and provisions for manual override. Man/machine function allocations in planning and en route flight segments are being evaluated. Planning and en route data are presented on one screen composed of two windows: (1) a map display presenting a view perpendicular to the orbital plane, depicting flight planning trajectory and time data attitude display presenting attitude and course data for use en route; and (2) an attitude display presenting local vertical-local horizontal attitude data superimposed on a highway-in-the-sky or flight channel representation of the flight planned course. Both display formats are presented while the MMU is en route. In addition to these displays, several original display elements are being developed, including a 3DOF flight detector for attitude commanding, a different flight detector for translation commands, and a pictorial representation of velocity deviations.

  9. Space Construction Experiment Definition Study (SCEDS), part 2. Volume 2: Study results

    NASA Technical Reports Server (NTRS)

    1982-01-01

    The Space Construction Experiment (SCE) was defined for integration into the Space Shuttle. This included development of flight assignment data, revision and update of preliminary mission timelines and test plans, analysis of flight safety issues, and definition of ground operations scenarios. New requirements for the flight experiment and changes for a large space antenna feed mask test article were incorporated. The program plan and cost estimates were updated. Revised SCE structural dynamics characteristics were provided for simulation and analysis of experimental tests to define and verify control limits and interactions effects between the SCE and the Orbiter digital automatic pilot.

  10. Human Systems Integration: Unmanned Aircraft Control Station Certification Plan Guidance

    NASA Technical Reports Server (NTRS)

    2005-01-01

    This document provides guidance to the FAA on important human factors considerations that can be used to support the certification of a UAS Aircraft Control Station (ACS). This document provides a synopsis of the human factors analysis, design and test activities to be performed to provide a basis for FAA certification. The data from these analyses, design activities, and tests, along with data from certification/qualification tests of other key components should be used to establish the ACS certification basis. It is expected that this information will be useful to manufacturers in developing the ACS Certification Plan,, and in supporting the design of their ACS.

  11. ESTA Exit Report

    NASA Technical Reports Server (NTRS)

    Lundebjerg, Kristen

    2016-01-01

    The Energy Test System's Area (ESTA) provides test capabilities and facilities to develop, evaluate or certify hardware in support of human spaceflight. The branch has a few different technical areas including pyrotechnics, batteries, electrical systems, power systems, propulsion and fluids. I will be mainly worked in the propulsion and fluids area. The tests/activities include testing the fluid and energy conversion systems that are required for the exploration and development of space. This group includes function and vibration tests, as well as thermal and vacuum tests. I was trained and certified as an ESTA test director in order to work on tests and sub tests with my mentor as well as the rest of the ESTA team. As a test director, I had the responsibility and authority for planning, developing, safety, execution and reporting on assigned test programs.

  12. Psychometric Analysis of Young Children's Responses to the Slosson Intelligence Test-Primary (SIT-P)

    ERIC Educational Resources Information Center

    Erford, Bradley T.; Pauletta, Deborah

    2005-01-01

    When developing efficient treatment plans for a client or student, professional counselors frequently rely on information about intellectual ability. The Slosson Intelligence Test-Primary (SIT-P; Erford, Vitali, & Slosson, 1999) is an expansion of the Slosson Intelligence Test-Revised (SIT-R; Nicholson & Hibpshman, 1991) and includes a…

  13. 75 FR 33317 - Request for Information (RFI) on the National Institutes of Health Plan To Develop the Genetic...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-11

    ... consistent with recommendations of the HHS Secretary's Advisory Committee on Genetics, Health, and Society... molecular basis, including, for example, information about what the test detects and what methods the test... and providing information on the molecular basis of genetic tests, such as detailed information about...

  14. Earth Observing System (EOS)/Advanced Microwave Sounding Unit A (AMSU-A) configuration management plan

    NASA Technical Reports Server (NTRS)

    Cavanaugh, J.

    1994-01-01

    This plan describes methods and procedures Aerojet will follow in the implementation of configuration control for each established baseline. The plan is written in response to the GSFC EOS CM Plan 420-02-02, dated January 1990, and also meets he requirements specified in DOD-STD-480, DOD-D 1000B, MIL-STD-483A, and MIL-STD-490B. The plan establishes the configuration management process to be used for the deliverable hardware, software, and firmware of the EOS/AMSU-A during development, design, fabrication, test, and delivery. This revision includes minor updates to reflect Aerojet's CM policies.

  15. Plan choice, health insurance cost and premium sharing.

    PubMed

    Kosteas, Vasilios D; Renna, Francesco

    2014-05-01

    We develop a model of premium sharing for firms that offer multiple insurance plans. We assume that firms offer one low quality plan and one high quality plan. Under the assumption of wage rigidities we found that the employee's contribution to each plan is an increasing function of that plan's premium. The effect of the other plan's premium is ambiguous. We test our hypothesis using data from the Employer Health Benefit Survey. Restricting the analysis to firms that offer both HMO and PPO plans, we measure the amount of the premium passed on to employees in response to a change in both premiums. We find evidence of large and positive effects of the increase in the plan's premium on the amount of the premium passed on to employees. The effect of the alternative plan's premium is negative but statistically significant only for the PPO plans. Copyright © 2014 Elsevier B.V. All rights reserved.

  16. Environmental restoration and waste management: Robotics technology development program: Robotics 5-year program plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This plan covers robotics Research, Development, Demonstration, Testing and Evaluation activities in the Program for the next five years. These activities range from bench-scale R D to full-scale hot demonstrations at DOE sites. This plan outlines applications of existing technology to near-term needs, the development and application of enhanced technology for longer-term needs, and initiation of advanced technology development to meet those needs beyond the five-year plan. The objective of the Robotic Technology Development Program (RTDP) is to develop and apply robotics technologies that will enable Environmental Restoration and Waste Management (ER WM) operations at DOE sites to be safer,more » faster and cheaper. Five priority DOE sites were visited in March 1990 to identify needs for robotics technology in ER WM operations. This 5-Year Program Plan for the RTDP detailed annual plans for robotics technology development based on identified needs. In July 1990 a forum was held announcing the robotics program. Over 60 organizations (industrial, university, and federal laboratory) made presentations on their robotics capabilities. To stimulate early interactions with the ER WM activities at DOE sites, as well as with the robotics community, the RTDP sponsored four technology demonstrations related to ER WM needs. These demonstrations integrated commercial technology with robotics technology developed by DOE in support of areas such as nuclear reactor maintenance and the civilian reactor waste program. 2 figs.« less

  17. Utilization of the International Space Station for Crew Autonomous Scheduling Test (CAST)

    NASA Technical Reports Server (NTRS)

    Healy, Matthew; Marquez, Jesica; Hillenius, Steven; Korth, David; Bakalyar, Laure Rush; Woodbury, Neil; Larsen, Crystal M.; Bates, Shelby; Kockler, Mikayla; Rhodes, Brooke; hide

    2017-01-01

    The United States space policy is evolving toward missions beyond low Earth orbit. In an effort to meet that policy, NASA has recognized Autonomous Mission Operations (AMO) as a valuable capability. Identified within AMO capabilities is the potential for autonomous planning and replanning during human spaceflight operations. That is allowing crew members to collectively or individually participate in the development of their own schedules. Currently, dedicated mission operations planners collaborate with international partners to create daily plans for astronauts aboard the International Space Station (ISS), taking into account mission requirements, ground rules, and various vehicle and payload constraints. In future deep space operations the crew will require more independence from ground support due to communication transmission delays. Furthermore, crew members who are provided with the capability to schedule their own activities are able to leverage direct experience operating in the space environment, and possibly maximize their efficiency. CAST (Crew Autonomous Scheduling Test) is an ISS investigation designed to analyze three important hypotheses about crew autonomous scheduling. First, given appropriate inputs, the crew is able to create and execute a plan in a reasonable period of time without impacts to mission success. Second, the proximity of the planner, in this case the crew, to the planned operations increases their operational efficiency. Third, crew members are more satisfied when given a role in plan development. This paper presents the results from a single astronaut test subject who participated in five CAST sessions. The details on the operational philosophy of CAST are discussed, including the approach to crew training, selection criteria for test days, and data collection methods. CAST is a technology demonstration payload sponsored by the ISS Research Science and Technology Office, and performed by experts in Mission Operations Planning from the Flight Operations Directorate at NASA Johnson Space Center, and researchers across multiple NASA centers. It is hoped the results of this investigation will guide NASA's implementation of autonomous mission operations for long duration human space missions to Mars and beyond.

  18. SU-F-T-65: AutomaticTreatment Planning for High-Dose Rate (HDR) Brachytherapy with a VaginalCylinder Applicator

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zhou, Y; Tan, J; Jiang, S

    Purpose: High dose rate (HDR) brachytherapy treatment planning is conventionally performed in a manual fashion. Yet it is highly desirable to perform computerized automated planning to improve treatment planning efficiency, eliminate human errors, and reduce plan quality variation. The goal of this research is to develop an automatic treatment planning tool for HDR brachytherapy with a cylinder applicator for vaginal cancer. Methods: After inserting the cylinder applicator into the patient, a CT scan was acquired and was loaded to an in-house developed treatment planning software. The cylinder applicator was automatically segmented using image-processing techniques. CTV was generated based on user-specifiedmore » treatment depth and length. Locations of relevant points (apex point, prescription point, and vaginal surface point), central applicator channel coordinates, and dwell positions were determined according to their geometric relations with the applicator. Dwell time was computed through an inverse optimization process. The planning information was written into DICOM-RT plan and structure files to transfer the automatically generated plan to a commercial treatment planning system for plan verification and delivery. Results: We have tested the system retrospectively in nine patients treated with vaginal cylinder applicator. These cases were selected with different treatment prescriptions, lengths, depths, and cylinder diameters to represent a large patient population. Our system was able to generate treatment plans for these cases with clinically acceptable quality. Computation time varied from 3–6 min. Conclusion: We have developed a system to perform automated treatment planning for HDR brachytherapy with a cylinder applicator. Such a novel system has greatly improved treatment planning efficiency and reduced plan quality variation. It also served as a testbed to demonstrate the feasibility of automatic HDR treatment planning for more complicated cases.« less

  19. Comprehensive Nuclear-Test-Ban Treaty: Background and Current Developments

    DTIC Science & Technology

    2013-01-02

    41 The National Academy of Sciences Study and Its Critics ...reliable and safe. So he has not ruled out testing in the future, but there are no plans to do so.”6 Critics expressed concern about the...nuclear weapons testing.”7 Another critic felt that increased funding for test readiness would in effect give prior approval for testing. In July 2002 a

  20. Vanguard/PLACE experiment system design and test plan

    NASA Technical Reports Server (NTRS)

    Taylor, R. E.

    1973-01-01

    The design, development, and testing of the NASA-GFSC Position Location and Aircraft Communications Equipment (PLACE) at C band frequency are discussed. The equipment was installed on the USNS Vanguard. The tests involved a sea test to evalute the position-location, 2-way voice, and 2-way data communications capability of PLACE and a trilateration test to position-fix the ATS-5 satellite using the PLACE system.

  1. Inspection and Verification of Domain Models with PlanWorks and Aver

    NASA Technical Reports Server (NTRS)

    Bedrax-Weiss, Tania; Frank, Jeremy; Iatauro, Michael; McGann, Conor

    2006-01-01

    When developing a domain model, it seems natural to bring the traditional informal tools of inspection and verification, debuggers and automated test suites, to bear upon the problems that will inevitably arise. Debuggers that allow inspection of registers and memory and stepwise execution have been a staple of software development of all sorts from the very beginning. Automated testing has repeatedly proven its considerable worth, to the extent that an entire design philosophy (Test Driven Development) has been developed around the writing of tests. Unfortunately, while not entirely without their uses, the limitations of these tools and the nature of the complexity of models and the underlying planning systems make the diagnosis of certain classes of problems and the verification of their solutions difficult or impossible. Debuggers provide a good local view of executing code, allowing a fine-grained look at algorithms and data. This view is, however, usually only at the level of the current scope in the implementation language, and the data-inspection capabilities of most debuggers usually consist of on-line print statements. More modem graphical debuggers offer a sort of tree view of data structures, but even this is too low-level and is often inappropriate for the kinds of structures created by planning systems. For instance, god or constraint networks are at best awkward when visualized as trees. Any any non-structural link between data structures, as through a lookup table, isn't captured at all. Further, while debuggers have powerful breakpointing facilities that are suitable for finding specific algorithmic errors, they have little use in the diagnosis of modeling errors.

  2. Developing a Remedial Keller-Plan Course.

    ERIC Educational Resources Information Center

    Allen, Peter S.

    1978-01-01

    A remedial self-study course in physics has been successfully developed at Nottingham University through repeated evaluations and modifications in such areas as testing and course organization. The development of a self-instructional center, and the use of film and videotape packages, have also been successful. (JMD)

  3. Test development for the thermionic system evaluation test (TSET) project

    NASA Astrophysics Data System (ADS)

    Morris, D. Brent; Standley, Vaughn H.; Schuller, Michael J.

    1992-01-01

    The arrival of a Soviet TOPAZ-II space nuclear reactor affords the US space nuclear power (SNP) community the opportunity to study an assembled thermionic conversion power system. The TOPAZ-II will be studied via the Thermionic System Evaluation Test (TSET) Project. This paper is devoted to the discussion of TSET test development as related to the objectives contained in the TSET Project Plan (Standley et al. 1991). The objectives contained in the Project Plan are the foundation for scheduled TSET tests on TOPAZ-II and are derived from the needs of the Air Force Thermionic SNP program. Our ability to meet the objectives is bounded by unique constraints, such as procurement requirements, operational limitations, and necessary interaction between US and Soviet Scientists and engineers. The fulfillment of the test objectives involves a thorough methodology of test scheduling and data managment. The overall goals for the TSET program are gaining technical understanding of a thermionic SNP system and demonstrating the capabilities and limitations of such a system while assisting in the training of US scientist and engineers in preparation for US SNP system testing. Tests presently scheduled as part of TSET include setup, demonstration, and verification tests; normal and off-normal operating test, and system and component performance tests.

  4. Separator Qualification for Aerospace Nickel-cadmium Cells

    NASA Technical Reports Server (NTRS)

    Milden, M. J.

    1984-01-01

    The development plans for a new separator for nickel cadmium (NiCd) cells is described. Research includes acceptance testing, operation in a charge/discharge characterization matrix, and life testing in low earth orbit (LEO) and geosynchronous (GEO) orbit under real time and accelerated conditions.

  5. 12 CFR 25.28 - Assigned ratings.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... on the bank's performance under the lending, investment and service tests, the community development test, the small bank performance standards, or an approved strategic plan, as applicable. (b) Lending... credit practices. (1) The OCC's evaluation of a bank's CRA performance is adversely affected by evidence...

  6. Progress of Crew Autonomous Scheduling Test (CAST) On the ISS

    NASA Technical Reports Server (NTRS)

    Healy, Matthew; Marquez, Jessica; Hillenius, Steven; Korth, David; Bakalyar, Lauren Rush; Woodbury, Neil; Larsen, Crystal M.; Bates, Shelby; Kockler, Mikayla; Rhodes, Brooke; hide

    2017-01-01

    The United States space policy is evolving toward missions beyond low Earth orbit. In an effort to meet that policy, NASA has recognized Autonomous Mission Operations (AMO) as a valuable capability. Identified within AMO capabilities is the potential for autonomous planning and replanning during human spaceflight operations. That is allowing crew members to collectively or individually participate in the development of their own schedules. Currently, dedicated mission operations planners collaborate with international partners to create daily plans for astronauts aboard the International Space Station (ISS), taking into account mission requirements, ground rules, and various vehicle and payload constraints. In future deep space operations the crew will require more independence from ground support due to communication transmission delays. Furthermore, crew members who are provided with the capability to schedule their own activities are able to leverage direct experience operating in the space environment, and possibly maximize their efficiency. CAST (Crew Autonomous Scheduling Test) is an ISS investigation designed to analyze three important hypotheses about crew autonomous scheduling. First, given appropriate inputs, the crew is able to create and execute a plan in a reasonable period of time without impacts to mission success. Second, the proximity of the planner, in this case the crew, to the planned operations increases their operational efficiency. Third, crew members are more satisfied when given a role in plan development. This presentation shows the progress done in this study with a single astronaut test subject participating in five CAST sessions. CAST is a technology demonstration payload sponsored by the ISS Research Science and Technology Office, and performed by experts in Mission Operations Planning from the Flight Operations Directorate at NASA Johnson Space Center, and researchers across multiple NASA centers.

  7. Curriculum Development, Refinement and Testing of Performance Indicators for Selected Vocational Programs. Final Report.

    ERIC Educational Resources Information Center

    Stella, Carolyn Rose

    Curriculum materials are provided for 15 vocational programs. Each course is divided into units, for which a lesson plan is provided. The lesson plans vary slightly by course but generally contain these components: unit title, goal and/or objective, content outline, rationale, procedures, a list of required materials, recommended form of…

  8. Element material experiment by EFFU

    NASA Technical Reports Server (NTRS)

    Hashimoto, Yoshihiro; Ichikawa, Masaaki; Takei, Mitsuru; Torii, Yoshihiro; Ota, Kazuo

    1995-01-01

    National Space Development Agency of JAPAN (NASDA) is planning to perform Element Material Exposure Experiment using Exposed Facility Flyer Unit (EFFU). Several materials which will be used on JEM (Japanese Experiment Module for the space station) will be exposed. Space environment monitoring is also planned in this experiment. Several ground based tests are now being performed and getting useful data.

  9. An Introduction to Project PRIME and CAMPUS MINNESOTA. Project PRIME Report, Number 2.

    ERIC Educational Resources Information Center

    Cordes, David C.

    PRIME is an acronym for Planning Resources in Minnesota Education. The project's primary objective is to test the implementation of CAMPUS (Comprehensive Analytical Methods for Planning University Systems) in one State College, one Junior College, and in one school at the University of Minnesota. The CAMPUS model was developed by the Institute for…

  10. 75 FR 32771 - Notice of Public Information Collection(s) Being Submitted to the Office of Management and Budget...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-09

    ... economies of scale and other cost saving measures for deployments that are already planned. In addition, Petitioners could benefit from the announced plans of some commercial carriers to begin construction of LTE... an open platform for development and testing of public safety 700 MHz LTE broadband equipment. This...

  11. External tank project new technology plan. [development of space shuttle external tank system

    NASA Technical Reports Server (NTRS)

    1973-01-01

    A production plan for the space shuttle external tank configuration is presented. The subjects discussed are: (1) the thermal protection system, (2) thermal coating application techniques, (3) manufacturing and tooling, (4) propulsion system configurations and components, (5) low temperature rotating and sliding joint seals, (6) lightning protection, and (7) nondestructive testing technology.

  12. From multifunctionality to multiple ecosystem services? A conceptual framework for multifunctionality in green infrastructure planning for urban areas.

    PubMed

    Hansen, Rieke; Pauleit, Stephan

    2014-05-01

    Green infrastructure (GI) and ecosystem services (ES) are promoted as concepts that have potential to improve environmental planning in urban areas based on a more holistic understanding of the complex interrelations and dynamics of social-ecological systems. However, the scientific discourses around both concepts still lack application-oriented frameworks that consider such a holistic perspective and are suitable to mainstream GI and ES in planning practice. This literature review explores how multifunctionality as one important principle of GI planning can be operationalized by approaches developed and tested in ES research. Specifically, approaches developed in ES research can help to assess the integrity of GI networks, balance ES supply and demand, and consider trade-offs. A conceptual framework for the assessment of multifunctionality from a social-ecological perspective is proposed that can inform the design of planning processes and support stronger exchange between GI and ES research.

  13. Marketing a continuing education course for healthcare managers.

    PubMed

    Welnetz, K

    1990-01-01

    The purpose of this article was to elicit from the relevant literature the important considerations to make when planning to market continuing education (CE) within hospitals. References on marketing from both institutions of higher education and hospitals were reviewed. Based on this review, a strategic marketing plan was developed and initially implemented in the hospital. A 1-day course for healthcare managers, entitled "Successful Writing of Proposals and Reports," was offered twice and tested, using the steps outlined in the strategic marketing plan. The plan proved to be most beneficial in systematically guiding our first attempts at marketing CE to hospitals and other healthcare facilities. From this plan, efforts are currently being made to further develop curricula and determine other programs that might be marketable to these same target groups. In addition, closer links with nearby educational institutions or affiliated hospitals are being pursued to support and maintain our ongoing marketing endeavors.

  14. Technical Note: Development and performance of a software tool for quality assurance of online replanning with a conventional Linac or MR-Linac.

    PubMed

    Chen, Guang-Pei; Ahunbay, Ergun; Li, X Allen

    2016-04-01

    To develop an integrated quality assurance (QA) software tool for online replanning capable of efficiently and automatically checking radiation treatment (RT) planning parameters and gross plan quality, verifying treatment plan data transfer from treatment planning system (TPS) to record and verify (R&V) system, performing a secondary monitor unit (MU) calculation with or without a presence of a magnetic field from MR-Linac, and validating the delivery record consistency with the plan. The software tool, named ArtQA, was developed to obtain and compare plan and treatment parameters from both the TPS and the R&V system database. The TPS data are accessed via direct file reading and the R&V data are retrieved via open database connectivity and structured query language. Plan quality is evaluated with both the logical consistency of planning parameters and the achieved dose-volume histograms. Beams in between the TPS and R&V system are matched based on geometry configurations. To consider the effect of a 1.5 T transverse magnetic field from MR-Linac in the secondary MU calculation, a method based on modified Clarkson integration algorithm was developed and tested for a series of clinical situations. ArtQA has been used in their clinic and can quickly detect inconsistencies and deviations in the entire RT planning process. With the use of the ArtQA tool, the efficiency for plan check including plan quality, data transfer, and delivery check can be improved by at least 60%. The newly developed independent MU calculation tool for MR-Linac reduces the difference between the plan and calculated MUs by 10%. The software tool ArtQA can be used to perform a comprehensive QA check from planning to delivery with conventional Linac or MR-Linac and is an essential tool for online replanning where the QA check needs to be performed rapidly.

  15. Technical Note: Development and performance of a software tool for quality assurance of online replanning with a conventional Linac or MR-Linac

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chen, Guang-Pei, E-mail: gpchen@mcw.edu; Ahunbay, Ergun; Li, X. Allen

    Purpose: To develop an integrated quality assurance (QA) software tool for online replanning capable of efficiently and automatically checking radiation treatment (RT) planning parameters and gross plan quality, verifying treatment plan data transfer from treatment planning system (TPS) to record and verify (R&V) system, performing a secondary monitor unit (MU) calculation with or without a presence of a magnetic field from MR-Linac, and validating the delivery record consistency with the plan. Methods: The software tool, named ArtQA, was developed to obtain and compare plan and treatment parameters from both the TPS and the R&V system database. The TPS data aremore » accessed via direct file reading and the R&V data are retrieved via open database connectivity and structured query language. Plan quality is evaluated with both the logical consistency of planning parameters and the achieved dose–volume histograms. Beams in between the TPS and R&V system are matched based on geometry configurations. To consider the effect of a 1.5 T transverse magnetic field from MR-Linac in the secondary MU calculation, a method based on modified Clarkson integration algorithm was developed and tested for a series of clinical situations. Results: ArtQA has been used in their clinic and can quickly detect inconsistencies and deviations in the entire RT planning process. With the use of the ArtQA tool, the efficiency for plan check including plan quality, data transfer, and delivery check can be improved by at least 60%. The newly developed independent MU calculation tool for MR-Linac reduces the difference between the plan and calculated MUs by 10%. Conclusions: The software tool ArtQA can be used to perform a comprehensive QA check from planning to delivery with conventional Linac or MR-Linac and is an essential tool for online replanning where the QA check needs to be performed rapidly.« less

  16. Fidelity of test development process within a national science grant

    NASA Astrophysics Data System (ADS)

    Brumfield, Teresa E.

    In 2002, a math-science partnership (MSP) program was initiated by a national science grant. The purpose of the MSP program was to promote the development, implementation, and sustainability of promising partnerships among institutions of higher education, K-12 schools and school systems, as well as other important stakeholders. One of the funded projects included a teacher-scientist collaborative that instituted a professional development system to prepare teachers to use inquiry-based instructional modules. The MSP program mandated evaluations of its funded projects. One of the teacher-scientist collaborative project's outcomes specifically focused on teacher and student science content and process skills. In order to provide annual evidence of progress and to measure the impact of the project's efforts, and because no appropriate science tests were available to measure improvements in content knowledge of participating teachers and their students, the project contracted for the development of science tests. This dissertation focused on the process of test development within an evaluation and examined planned (i.e., expected) and actual (i.e., observed) test development, specifically concentrating on the factors that affected the actual test development process. Planned test development was defined as the process of creating tests according to the well-established test development procedures recommended by the AERA/APA/NCME 1999 Standards for Educational and Psychological Testing. Actual test development was defined as the process of creating tests as it actually took place. Because case study provides an in-depth, longitudinal examination of an event (i.e., case) in a naturalistic setting, it was selected as the appropriate methodology to examine the difference between planned and actual test development. The case (or unit of analysis) was the test development task, a task that was bounded by the context in which it occurred---and over which this researcher had no control---and by time. The purpose for studying the case was to gain a more in-depth, holistic understanding of the real-life test development task that took place within a project evaluation context. In particular, this case study investigated how the actual test development process was affected by: (1) the national and state (i.e., NC) science standards, (2) the NSF's definition of "evidence" in a project evaluation, (3) the MSP project's understanding of the role of the to-be-developed tests in their project evaluation, (4) the MSP project's understanding of the test development process, and (5) the MSP project's participants (e.g., teacher item-writers and scientists). From an investigation of this case, it was concluded that: (a) constructing psychometrically sound tests within an evaluation is not easy, (b) sufficient time and resources to construct such measures properly are seldom provided, and (c) test construction---at least within an evaluation---is not routine and unproblematic. Based upon the results from this case study, it was recommended that stakeholders (i.e., program managers, project directors, and evaluators) be familiar with the steps and standards used to develop psychometrically sound tests. Additionally, it was recommended that, for future research, a meta-analysis that examines only the test development process be conducted of all other MSP projects. A second suggested future research area was to establish a protocol that provides a systematic means by which to examine an existing or proposed MSP project for alignment with state science standards. Such a protocol would be cost-effective in that demonstrated alignment with state science standards would enable projects to use existing state science assessments, which must be in place, according to NCLB, by the 2007-2008 school year, to demonstrate student achievement. In this way, project directors and evaluators, typically with limited familiarity with the steps and standards by which psychometrically sound assessments are created, would not be placed in the role of test developer.

  17. Research and technology goals and objectives for Integrated Vehicle Health Management (IVHM)

    NASA Technical Reports Server (NTRS)

    1992-01-01

    Integrated Vehicle Health Management (IVHM) is defined herein as the capability to efficiently perform checkout, testing, and monitoring of space transportation vehicles, subsystems, and components before, during, and after operational This includes the ability to perform timely status determination, diagnostics, and prognostics. IVHM must support fault-tolerant response including system/subsystem reconfiguration to prevent catastrophic failures; and IVHM must support the planning and scheduling of post-operational maintenance. The purpose of this document is to establish the rationale for IVHM and IVHM research and technology planning, and to develop technical goals and objectives. This document is prepared to provide a broad overview of IVHM for technology and advanced development activities and, more specifically, to provide a planning reference from an avionics viewpoint under the OAST Transportation Technology Program Strategic Plan.

  18. [Integration of the radiotherapy irradiation planning in the digital workflow].

    PubMed

    Röhner, F; Schmucker, M; Henne, K; Momm, F; Bruggmoser, G; Grosu, A-L; Frommhold, H; Heinemann, F E

    2013-02-01

    At the Clinic of Radiotherapy at the University Hospital Freiburg, all relevant workflow is paperless. After implementing the Operating Schedule System (OSS) as a framework, all processes are being implemented into the departmental system MOSAIQ. Designing a digital workflow for radiotherapy irradiation planning is a large challenge, it requires interdisciplinary expertise and therefore the interfaces between the professions also have to be interdisciplinary. For every single step of radiotherapy irradiation planning, distinct responsibilities have to be defined and documented. All aspects of digital storage, backup and long-term availability of data were considered and have already been realized during the OSS project. After an analysis of the complete workflow and the statutory requirements, a detailed project plan was designed. In an interdisciplinary workgroup, problems were discussed and a detailed flowchart was developed. The new functionalities were implemented in a testing environment by the Clinical and Administrative IT Department (CAI). After extensive tests they were integrated into the new modular department system. The Clinic of Radiotherapy succeeded in realizing a completely digital workflow for radiotherapy irradiation planning. During the testing phase, our digital workflow was examined and afterwards was approved by the responsible authority.

  19. Feasibility study of an intensity-modulated radiation model for the study of erectile dysfunction.

    PubMed

    Koontz, Bridget F; Yan, Hui; Kimura, Masaki; Vujaskovic, Zeljko; Donatucci, Craig; Yin, Fang-Fang

    2011-02-01

    Preclinical studies of radiotherapy (RT) induced erectile dysfunction (ED) have been limited by radiation toxicity when using large fields. To develop a protocol of rat prostate irradiation using techniques mimicking the current clinical standard of intensity modulated radiotherapy (IMRT). Quality assurance (QA) testing of plan accuracy, animal health 9 weeks after RT, and intracavernosal pressure (ICP) measurement on cavernosal nerve stimulation. Computed tomography-based planning was used to develop a stereotactic radiosurgery (SRS) treatment plan for five young adult male Sprague-Dawley rats. Two treatment planning strategies were utilized to deliver 20 Gy in a single fraction: three-dimensional dynamic conformal arc and intensity-modulated arc (RapidArc). QA testing was performed for each plan type. Treatment was delivered using a NovalisTX (Varian Medical Systems) with high-definition multi-leaf collimators using on-board imaging prior to treatment. Each animal was evaluated for ED 2 months after treatment by nerve stimulation and ICP measurement. The mean prostate volume and target volume (5 mm expansion of prostate) for the five animals was 0.36 and 0.66 cm3, respectively. Both conformal and RapidArc plans provided at least 95% coverage of the target volume, with rapid dose fall-off. QA plans demonstrated strong agreement between doses of calculated and delivered plans, although the conformal arc plan was more homogenous in treatment delivery. Treatment was well tolerated by the animals with no toxicity out to 9 weeks. Compared with control animals, significant reduction in ICP/mean arterial pressure, maximum ICP, and ICP area under the curve were noted. Tightly conformal dynamic arc prostate irradiation is feasible and results in minimal toxicity and measurable changes in erectile function. © 2010 International Society for Sexual Medicine.

  20. Master plan nurse duty roster using the 0-1 goal programming technique

    NASA Astrophysics Data System (ADS)

    Ismail, Wan Rosmanira; Jenal, Ruzzakiah

    2013-04-01

    The scheduling of nurses is particularly challenging because of the nature of the work which is around the clock. In addition, inefficient duty roster can have an effect on the nurses well being as well as their job satisfaction. In nurse scheduling problem (NSP), nurses are generally allocated to periods of work over a specified time horizon. A typical length of the schedule varies from a few weeks to a month. The schedule will be consistently rebuilt after the specified time period and will result in a time-consuming task for the administrative staff involved. Moreover, the task becomes overwhelming when the staff needs to consider the previous duty rosters in order to maintain the quality of schedules. Therefore, this study suggests the development of a master plan for a nurse duty roster for approximately one year. The master plan starts with the development of a blue print for the nurse duty roster using a 0-1 goal programming technique. The appropriate working period for this blue print is formulated based on the number of night shifts and the number of required nurses for night shift per schedule. Subsequently, the blue print is repeated to complete the annual nurse duty roster. These newly developed procedures were then tested on several data sets. The test results found that the master plan has successfully distributed the annual workload evenly among nurses. In addition, the master plan allows nurses to arrange their career and social activities in advance.

  1. Thermal energy storage flight experiments

    NASA Technical Reports Server (NTRS)

    Namkoong, D.

    1989-01-01

    Consideration is given to the development of an experimental program to study heat transfer, energy storage, fluid movement, and void location under microgravity. Plans for experimental flight packages containing Thermal Energy Storage (TES) material applicable for advanced solar heat receivers are discussed. Candidate materials for TES include fluoride salts, salt eutectics, silicides, and metals. The development of a three-dimensional computer program to describe TES material behavior undergoing melting and freezing under microgravity is also discussed. The TES experiment concept and plans for ground and flight tests are outlined.

  2. Post Launch Calibration and Testing of the Advanced Baseline Imager on the GOES-R Satellite

    NASA Technical Reports Server (NTRS)

    Lebair, William; Rollins, C.; Kline, John; Todirita, M.; Kronenwetter, J.

    2016-01-01

    The Geostationary Operational Environmental Satellite R (GOES-R) series is the planned next generation of operational weather satellites for the United State's National Oceanic and Atmospheric Administration. The first launch of the GOES-R series is planned for October 2016. The GOES-R series satellites and instruments are being developed by the National Aeronautics and Space Administration (NASA). One of the key instruments on the GOES-R series is the Advance Baseline Imager (ABI). The ABI is a multi-channel, visible through infrared, passive imaging radiometer. The ABI will provide moderate spatial and spectral resolution at high temporal and radiometric resolution to accurately monitor rapidly changing weather. Initial on-orbit calibration and performance characterization is crucial to establishing baseline used to maintain performance throughout mission life. A series of tests has been planned to establish the post launch performance and establish the parameters needed to process the data in the Ground Processing Algorithm. The large number of detectors for each channel required to provide the needed temporal coverage presents unique challenges for accurately calibrating ABI and minimizing striping. This paper discusses the planned tests to be performed on ABI over the six-month Post Launch Test period and the expected performance as it relates to ground tests.

  3. Post Launch Calibration and Testing of the Advanced Baseline Imager on the GOES-R Satellite

    NASA Technical Reports Server (NTRS)

    Lebair, William; Rollins, C.; Kline, John; Todirita, M.; Kronenwetter, J.

    2016-01-01

    The Geostationary Operational Environmental Satellite R (GOES-R) series is the planned next generation of operational weather satellites for the United States National Oceanic and Atmospheric Administration. The first launch of the GOES-R series is planned for October 2016. The GOES-R series satellites and instruments are being developed by the National Aeronautics and Space Administration (NASA). One of the key instruments on the GOES-R series is the Advance Baseline Imager (ABI). The ABI is a multi-channel, visible through infrared, passive imaging radiometer. The ABI will provide moderate spatial and spectral resolution at high temporal and radiometric resolution to accurately monitor rapidly changing weather. Initial on-orbit calibration and performance characterization is crucial to establishing baseline used to maintain performance throughout mission life. A series of tests has been planned to establish the post launch performance and establish the parameters needed to process the data in the Ground Processing Algorithm. The large number of detectors for each channel required to provide the needed temporal coverage presents unique challenges for accurately calibrating ABI and minimizing striping. This paper discusses the planned tests to be performed on ABI over the six-month Post Launch Test period and the expected performance as it relates to ground tests.

  4. Post launch calibration and testing of the Advanced Baseline Imager on the GOES-R satellite

    NASA Astrophysics Data System (ADS)

    Lebair, William; Rollins, C.; Kline, John; Todirita, M.; Kronenwetter, J.

    2016-05-01

    The Geostationary Operational Environmental Satellite R (GOES-R) series is the planned next generation of operational weather satellites for the United State's National Oceanic and Atmospheric Administration. The first launch of the GOES-R series is planned for October 2016. The GOES-R series satellites and instruments are being developed by the National Aeronautics and Space Administration (NASA). One of the key instruments on the GOES-R series is the Advance Baseline Imager (ABI). The ABI is a multi-channel, visible through infrared, passive imaging radiometer. The ABI will provide moderate spatial and spectral resolution at high temporal and radiometric resolution to accurately monitor rapidly changing weather. Initial on-orbit calibration and performance characterization is crucial to establishing baseline used to maintain performance throughout mission life. A series of tests has been planned to establish the post launch performance and establish the parameters needed to process the data in the Ground Processing Algorithm. The large number of detectors for each channel required to provide the needed temporal coverage presents unique challenges for accurately calibrating ABI and minimizing striping. This paper discusses the planned tests to be performed on ABI over the six-month Post Launch Test period and the expected performance as it relates to ground tests.

  5. Development and evaluation of an end‐to‐end test for head and neck IMRT with a novel multiple‐dosimetric modality phantom

    PubMed Central

    Zakjevskii, Viatcheslav V.; Knill, Cory S.; Rakowski, Joseph. T.

    2016-01-01

    A comprehensive end‐to‐end test for head and neck IMRT treatments was developed using a custom phantom designed to utilize multiple dosimetry devices. Initial end‐to‐end test and custom H&N phantom were designed to yield maximum information in anatomical regions significant to H&N plans with respect to: (i) geometric accuracy, (ii) dosimetric accuracy, and (iii) treatment reproducibility. The phantom was designed in collaboration with Integrated Medical Technologies. The phantom was imaged on a CT simulator and the CT was reconstructed with 1 mm slice thickness and imported into Varian's Eclipse treatment planning system. OARs and the PTV were contoured with the aid of Smart Segmentation. A clinical template was used to create an eight‐field IMRT plan and dose was calculated with heterogeneity correction on. Plans were delivered with a TrueBeam equipped with a high definition MLC. Preliminary end‐to‐end results were measured using film, ion chambers, and optically stimulated luminescent dosimeters (OSLDs). Ion chamber dose measurements were compared to the treatment planning system. Films were analyzed with FilmQA Pro using composite gamma index. OSLDs were read with a MicroStar reader using a custom calibration curve. Final phantom design incorporated two axial and one coronal film planes with 18 OSLD locations adjacent to those planes as well as four locations for IMRT ionization chambers below inferior film plane. The end‐to‐end test was consistently reproducible, resulting in average gamma pass rate greater than 99% using 3%/3 mm analysis criteria, and average OSLD and ion chamber measurements within 1% of planned dose. After initial calibration of OSLD and film systems, the end‐to‐end test provides next‐day results, allowing for integration in routine clinical QA. Preliminary trials have demonstrated that our end‐to‐end is a reproducible QA tool that enables the ongoing evaluation of dosimetric and geometric accuracy of clinical head and neck treatments. PACS number(s): 87.55.Qr PMID:27074453

  6. Baseband processor development/test performance for 30/20 GHz SS-TDMA communication system

    NASA Technical Reports Server (NTRS)

    Brown, L.; Sabourin, D.; Attwood, S.

    1984-01-01

    The baseband processor (BBP) development for the 30/20 GHz Satellite Communication System is described. The SS-TDMA concept for future satellite communications is reviewed, describing the overall system, the satellite payload, and the frequency plan. A brief general description of the BBP is given, and the proof-of-concept model of the BBP is summarized. Key technologies and custom LSI developed for the BBP are listed. Finally, key technology developments and test data are reported for the BBP.

  7. Environmental restoration and waste management: Five-year plan, Fiscal Years 1992--1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Middleman, L.I.

    1990-06-01

    This document reflects DOE's fulfillment of a major commitment of the Environmental Restoration and Waste Management Five-Year Plan: reorganization to create an Office of Environmental Restoration and Waste Management (EM) responsible for the consolidated environmental management of nuclear-related facilities and sites formerly under the Assistant Secretaries for Defense Programs and Nuclear Energy and the Director of the Office of Energy Research. The purposes of this Plan for FY 1992--1996 are to measure progress in meeting DOE's compliance, cleanup, and waste management agenda; to incorporate a revised and condensed version of the Draft Research Development, Demonstration, Testing, and Evaluation (RDDT E)more » Plan (November 1989) to describe DOE's process for developing the new technologies critically needed to solve its environmental problems; to show DOE's current strategy and planned activities through FY 1996, including reasons for changes required to meet compliance and cleanup commitments; and to increase the involvement of other agencies and the public in DOE's planning.« less

  8. Optical Testing and Verification Methods for the James Webb Space Telescope Integrated Science Instrument Module Element

    NASA Technical Reports Server (NTRS)

    Antonille, Scott R.; Miskey, Cherie L.; Ohl, Raymond G.; Rohrbach, Scott O.; Aronstein, David L.; Bartoszyk, Andrew E.; Bowers, Charles W.; Cofie, Emmanuel; Collins, Nicholas R.; Comber, Brian J.; hide

    2016-01-01

    NASA's James Webb Space Telescope (JWST) is a 6.6m diameter, segmented, deployable telescope for cryogenic IR space astronomy (40K). The JWST Observatory includes the Optical Telescope Element (OTE) and the Integrated Science Instrument Module (ISIM) that contains four science instruments (SI) and the fine guider. The SIs are mounted to a composite metering structure. The SI and guider units were integrated to the ISIM structure and optically tested at the NASA Goddard Space Flight Center as a suite using the Optical Telescope Element SIMulator (OSIM). OSIM is a full field, cryogenic JWST telescope simulator. SI performance, including alignment and wave front error, were evaluated using OSIM. We describe test and analysis methods for optical performance verification of the ISIM Element, with an emphasis on the processes used to plan and execute the test. The complexity of ISIM and OSIM drove us to develop a software tool for test planning that allows for configuration control of observations, associated scripts, and management of hardware and software limits and constraints, as well as tools for rapid data evaluation, and flexible re-planning in response to the unexpected. As examples of our test and analysis approach, we discuss how factors such as the ground test thermal environment are compensated in alignment. We describe how these innovative methods for test planning and execution and post-test analysis were instrumental in the verification program for the ISIM element, with enough information to allow the reader to consider these innovations and lessons learned in this successful effort in their future testing for other programs.

  9. Optical testing and verification methods for the James Webb Space Telescope Integrated Science Instrument Module element

    NASA Astrophysics Data System (ADS)

    Antonille, Scott R.; Miskey, Cherie L.; Ohl, Raymond G.; Rohrbach, Scott O.; Aronstein, David L.; Bartoszyk, Andrew E.; Bowers, Charles W.; Cofie, Emmanuel; Collins, Nicholas R.; Comber, Brian J.; Eichhorn, William L.; Glasse, Alistair C.; Gracey, Renee; Hartig, George F.; Howard, Joseph M.; Kelly, Douglas M.; Kimble, Randy A.; Kirk, Jeffrey R.; Kubalak, David A.; Landsman, Wayne B.; Lindler, Don J.; Malumuth, Eliot M.; Maszkiewicz, Michael; Rieke, Marcia J.; Rowlands, Neil; Sabatke, Derek S.; Smith, Corbett T.; Smith, J. Scott; Sullivan, Joseph F.; Telfer, Randal C.; Te Plate, Maurice; Vila, M. Begoña.; Warner, Gerry D.; Wright, David; Wright, Raymond H.; Zhou, Julia; Zielinski, Thomas P.

    2016-09-01

    NASA's James Webb Space Telescope (JWST) is a 6.5m diameter, segmented, deployable telescope for cryogenic IR space astronomy. The JWST Observatory includes the Optical Telescope Element (OTE) and the Integrated Science Instrument Module (ISIM), that contains four science instruments (SI) and the Fine Guidance Sensor (FGS). The SIs are mounted to a composite metering structure. The SIs and FGS were integrated to the ISIM structure and optically tested at NASA's Goddard Space Flight Center using the Optical Telescope Element SIMulator (OSIM). OSIM is a full-field, cryogenic JWST telescope simulator. SI performance, including alignment and wavefront error, was evaluated using OSIM. We describe test and analysis methods for optical performance verification of the ISIM Element, with an emphasis on the processes used to plan and execute the test. The complexity of ISIM and OSIM drove us to develop a software tool for test planning that allows for configuration control of observations, implementation of associated scripts, and management of hardware and software limits and constraints, as well as tools for rapid data evaluation, and flexible re-planning in response to the unexpected. As examples of our test and analysis approach, we discuss how factors such as the ground test thermal environment are compensated in alignment. We describe how these innovative methods for test planning and execution and post-test analysis were instrumental in the verification program for the ISIM element, with enough information to allow the reader to consider these innovations and lessons learned in this successful effort in their future testing for other programs.

  10. Overview of medical operations for a manned stratospheric balloon flight.

    PubMed

    Blue, Rebecca S; Law, Jennifer; Norton, Sean C; Garbino, Alejandro; Pattarini, James M; Turney, Matthew W; Clark, Jonathan B

    2013-03-01

    Red Bull Stratos was a commercial program designed to bring a test parachutist protected by a full-pressure suit via a stratospheric balloon with a pressurized capsule to 120,000 ft (36,576 m), from which he would freefall and subsequently parachute to the ground. On March 15, 2012, the Red Bull Stratos program successfully conducted a preliminary manned balloon test flight and parachute jump, reaching a final altitude of 71,581 ft (21,818 m). In light of the uniqueness of the operation and medical threats faced, a comprehensive medical plan was needed to ensure prompt and efficient response to any medical contingencies. This report will serve to discuss the medical plans put into place before the first manned balloon flight and the actions of the medical team during that flight. The medical operations developed for this program will be systematically evaluated, particularly, specific recommendations for improvement in future high-altitude and commercial space activities. A multipronged approach to medical support was developed, consisting of event planning, medical personnel, equipment, contingency-specific considerations, and communications. Medical operations were found to be highly successful when field-tested during this stratospheric flight, and the experience allowed for refinement of medical operations for future flights. The lessons learned and practices established for this program can easily be used to tailor a plan specific to other aviation or spaceflight events.

  11. Design, fabrication, test, qualification and price analysis for third generation design solar cell modules

    NASA Technical Reports Server (NTRS)

    1980-01-01

    An updated program plan is presented showing the task descriptions depicting the work, progress, achievements, and the cause of any deviations from the original plan (SC-1), and how this impacted on the original schedule of the program. In addition there is an update documenting all design alterations made during the pre-production phase and a complete up to date set of engineering and manufacturing documentation (CM-1). The purpose of the work in the original plan was to explore, design, develop, test, and deliver 1000 watts of prototype flat plate, photovoltaic modules appropriate for use in applications in the 20 to 500 kilowatt range and which show potential for meeting the 1986 cost goals.

  12. First Crewed Flight: Rationale, Considerations and Challenges from the Constellation Experience

    NASA Technical Reports Server (NTRS)

    Noriega, Carlos; Arceneaux, William; Williams, Jeffrey A.; Rhatigan, Jennifer L.

    2011-01-01

    NASA's Constellation Program has made the most progress in a generation towards building an integrated human-rated spacecraft and launch vehicle. During that development, it became clear that NASA's human-rating requirements lacked the specificity necessary to defend a program plan, particularly human-rating test flight plans, from severe budget challenges. This paper addresses the progress Constellation achieved, problems encountered in clarifying and defending a human-rating certification plan, and discusses key considerations for those who find themselves in similar straits with future human-rated spacecraft and vehicles. We assert, and support with space flight data, that NASA's current human-rating requirements do not adequately address "unknown-unknowns", or the unexpected things the hardware can reveal to the designer during test.

  13. Crane Cell Testing Support of NASA/Goddard Space Flight Center: An Update

    NASA Technical Reports Server (NTRS)

    Strawn, Mike; David, Jerry; Rao, Gopalakrishna M.

    2001-01-01

    The objectives presented in this viewgraph presentation include: 1) Verify the quality and reliability of aerospace battery cells and batteries for NASA flight programs; 2) Disseminate the data to develop a plan for in-orbit battery management and to design a cell/battery for future NASA spacecraft; and 3) Establish a cell test data base for rechargeable cell/batteries. In summary: quality EPT Ni-H2, EPT Super NiCd and SAFT NiCd cells have been demonstrated for aerospace applications; the data has been provided to NASA Centers and other agencies for their use and application; developed plan and used in NASA in-orbit battery management. Database on rechargeable cell/batteries is now available for customer use.

  14. Advanced long term cryogenic storage systems

    NASA Technical Reports Server (NTRS)

    Brown, Norman S.

    1987-01-01

    Long term, cryogenic fluid storage facilities will be required to support future space programs such as the space-based Orbital Transfer Vehicle (OTV), Telescopes, and Laser Systems. An orbital liquid oxygen/liquid hydrogen storage system with an initial capacity of approximately 200,000 lb will be required. The storage facility tank design must have the capability of fluid acquisition in microgravity and limit cryogen boiloff due to environmental heating. Cryogenic boiloff management features, minimizing Earth-to-orbit transportation costs, will include advanced thick multilayer insulation/integrated vapor cooled shield concepts, low conductance support structures, and refrigeration/reliquefaction systems. Contracted study efforts are under way to develop storage system designs, technology plans, test article hardware designs, and develop plans for ground/flight testing.

  15. XML technology planning database : lessons learned

    NASA Technical Reports Server (NTRS)

    Some, Raphael R.; Neff, Jon M.

    2005-01-01

    A hierarchical Extensible Markup Language(XML) database called XCALIBR (XML Analysis LIBRary) has been developed by Millennium Program to assist in technology investment (ROI) analysis and technology Language Capability the New return on portfolio optimization. The database contains mission requirements and technology capabilities, which are related by use of an XML dictionary. The XML dictionary codifies a standardized taxonomy for space missions, systems, subsystems and technologies. In addition to being used for ROI analysis, the database is being examined for use in project planning, tracking and documentation. During the past year, the database has moved from development into alpha testing. This paper describes the lessons learned during construction and testing of the prototype database and the motivation for moving from an XML taxonomy to a standard XML-based ontology.

  16. Apollo telescope mount thermal systems unit thermal vacuum test

    NASA Technical Reports Server (NTRS)

    Trucks, H. F.; Hueter, U.; Wise, J. H.; Bachtel, F. D.

    1971-01-01

    The Apollo Telescope Mount's thermal systems unit was utilized to conduct a full-scale thermal vacuum test to verify the thermal design and the analytical techniques used to develop the thermal mathematical models. Thermal vacuum test philosophy, test objectives configuration, test monitoring, environment simulation, vehicle test performance, and data correlation are discussed. Emphasis is placed on planning and execution of the thermal vacuum test with particular attention on problems encountered in conducting a test of this maguitude.

  17. An experiment with interactive planning models

    NASA Technical Reports Server (NTRS)

    Beville, J.; Wagner, J. H.; Zannetos, Z. S.

    1970-01-01

    Experiments on decision making in planning problems are described. Executives were tested in dealing with capital investments and competitive pricing decisions under conditions of uncertainty. A software package, the interactive risk analysis model system, was developed, and two controlled experiments were conducted. It is concluded that planning models can aid management, and predicted uses of the models are as a central tool, as an educational tool, to improve consistency in decision making, to improve communications, and as a tool for consensus decision making.

  18. A Study of the Communication Capabilities of the OPARS Flight Planning System for Various Levels of Demand.

    DTIC Science & Technology

    1980-03-01

    Oceanography Center (FNOC) is currently testing and evaluating a computerized flight plan system, referred to, for short, as OPARS. This sytem , developed to...replace the Lockheed Jetplan flight plan sytem , provides users at remote sites with direct access to the FNOC computer via 11 telephone lines. The...validity, but only for format. For example, an entry of ABCE , as the four- letter identification code for the destination airfield, would be accepted

  19. Commercial Skills Test Information Management System (CSTIMS) final report and self-sustainability plan.

    DOT National Transportation Integrated Search

    2014-03-01

    The Commercial Skills Test Information Management System (CSTIMS) was developed as a Web-based, software-as-a-service system to prevent and deter fraud perpetrated by third-party commercial drivers license (CDL) examiners in the portion of the CDL...

  20. Integrated corridor management initiative : demonstration phase evaluation. Dallas institutional and organizational analysis test plan.

    DOT National Transportation Integrated Search

    2000-10-01

    The Advanced Rural Traveler Information System (ARTIS) began development June 30, 1995. While a number of activities were underway to operationally test and evaluate metro or urban traveler information systems in the 75 target markets, ARTIS setout t...

  1. Development of the trickle roof cooling and heating system: Experimental plan

    NASA Astrophysics Data System (ADS)

    Haves, P.; Jankovic, T.; Doderer, E.

    1982-07-01

    A passive system applicable both to retrofit and new construction was developed. This system (the trickle roof system) dissipates heat from a thin film of water flowing over the roof. A small scale trickle roof system dissipator was tested at Trinity University under a range of ambient conditions and operating configurations. The results suggest that trickle roof systems should have comparable performance to roof pond systems. Provided is a review of the trickle roof system concept, several possible configurations, and the benefits the systems can provide. Test module experiments And results are presented in detail. The requirements for full scale testing are discussed and a plan is outlined using the two identical residential scale passive test facility buildings at Trinity University, San Antonio, Texas. Full scale experimental results would be used to validate computer algorithms, provide system optimization, and produce a nationwide performance assessment and design guidelines. This would provide industry with the information necessary to determine the commerical potential of the trickle roof system.

  2. Tank 241-AY-101 Privatization Push Mode Core Sampling and Analysis Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    TEMPLETON, A.M.

    2000-01-12

    This sampling and analysis plan (SAP) identifies characterization objectives pertaining to sample collection, laboratory analytical evaluation, and reporting requirements for samples obtained from tank 241-AY-101. The purpose of this sampling event is to obtain information about the characteristics of the contents of 241-AY-101 required to satisfy Data Quality Objectives For RPP Privatization Phase I: Confirm Tank T Is An Appropriate Feed Source For High-Level Waste Feed Batch X(HLW DQO) (Nguyen 1999a), Data Quality Objectives For TWRS Privatization Phase I : Confirm Tank T Is An Appropriate Feed Source For Low-Activity Waste Feed Batch X (LAW DQO) (Nguyen 1999b), Low Activitymore » Waste and High-Level Waste Feed Data Quality Objectives (L and H DQO) (Patello et al. 1999), and Characterization Data Needs for Development, Design, and Operation of Retrieval Equipment Developed through the Data Quality Objective Process (Equipment DQO) (Bloom 1996). Special instructions regarding support to the LAW and HLW DQOs are provided by Baldwin (1999). Push mode core samples will be obtained from risers 15G and 150 to provide sufficient material for the chemical analyses and tests required to satisfy these data quality objectives. The 222-S Laboratory will extrude core samples; composite the liquids and solids; perform chemical analyses on composite and segment samples; archive half-segment samples; and provide subsamples to the Process Chemistry Laboratory. The Process Chemistry Laboratory will prepare test plans and perform process tests to evaluate the behavior of the 241-AY-101 waste undergoing the retrieval and treatment scenarios defined in the applicable DQOs. Requirements for analyses of samples originating in the process tests will be documented in the corresponding test plans and are not within the scope of this SAP.« less

  3. Tank 241-AY-101 Privatization Push Mode Core Sampling and Analysis Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    TEMPLETON, A.M.

    2000-05-19

    This sampling and analysis plan (SAP) identifies characterization objectives pertaining to sample collection, laboratory analytical evaluation, and reporting requirements for samples obtained from tank 241-AY-101. The purpose of this sampling event is to obtain information about the characteristics of the contents of 241-AY-101 required to satisfy ''Data Quality Objectives For RPP Privatization Phase I: Confirm Tank T Is An Appropriate Feed Source For High-Level Waste Feed Batch X(HLW DQO)' (Nguyen 1999a), ''Data Quality Objectives For TWRS Privatization Phase I: Confirm Tank T Is An Appropriate Feed Source For Low-Activity Waste Feed Butch X (LAW DQO) (Nguyen 1999b)'', ''Low Activity Wastemore » and High-Level Waste Feed Data Quality Objectives (L&H DQO)'' (Patello et al. 1999), and ''Characterization Data Needs for Development, Design, and Operation of Retrieval Equipment Developed through the Data Quality Objective Process (Equipment DQO)'' (Bloom 1996). Special instructions regarding support to the LAW and HLW DQOs are provided by Baldwin (1999). Push mode core samples will be obtained from risers 15G and 150 to provide sufficient material for the chemical analyses and tests required to satisfy these data quality objectives. The 222-S Laboratory will extrude core samples; composite the liquids and solids; perform chemical analyses on composite and segment samples; archive half-segment samples; and provide sub-samples to the Process Chemistry Laboratory. The Process Chemistry Laboratory will prepare test plans and perform process tests to evaluate the behavior of the 241-AY-101 waste undergoing the retrieval and treatment scenarios defined in the applicable DQOs. Requirements for analyses of samples originating in the process tests will be documented in the corresponding test plans and are not within the scope of this SAP.« less

  4. TU-D-201-06: HDR Plan Prechecks Using Eclipse Scripting API

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Palaniswaamy, G; Morrow, A; Kim, S

    Purpose: Automate brachytherapy treatment plan quality check using Eclipse v13.6 scripting API based on pre-configured rules to minimize human error and maximize efficiency. Methods: The HDR Precheck system is developed based on a rules-driven approach using Eclipse scripting API. This system checks for critical plan parameters like channel length, first source position, source step size and channel mapping. The planned treatment time is verified independently based on analytical methods. For interstitial or SAVI APBI treatment plans, a Patterson-Parker system calculation is performed to verify the planned treatment time. For endobronchial treatments, an analytical formula from TG-59 is used. Acceptable tolerancesmore » were defined based on clinical experiences in our department. The system was designed to show PASS/FAIL status levels. Additional information, if necessary, is indicated appropriately in a separate comments field in the user interface. Results: The HDR Precheck system has been developed and tested to verify the treatment plan parameters that are routinely checked by the clinical physicist. The report also serves as a reminder or checklist for the planner to perform any additional critical checks such as applicator digitization or scenarios where the channel mapping was intentionally changed. It is expected to reduce the current manual plan check time from 15 minutes to <1 minute. Conclusion: Automating brachytherapy plan prechecks significantly reduces treatment plan precheck time and reduces human errors. When fully developed, this system will be able to perform TG-43 based second check of the treatment planning system’s dose calculation using random points in the target and critical structures. A histogram will be generated along with tabulated mean and standard deviation values for each structure. A knowledge database will also be developed for Brachyvision plans which will then be used for knowledge-based plan quality checks to further reduce treatment planning errors and increase confidence in the planned treatment.« less

  5. CSTT Update: Fuel Quality Analyzer

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brosha, Eric L.; Lujan, Roger W.; Mukundan, Rangachary

    These are slides from a presentation. The following topics are covered: project background (scope and approach), developing the prototype (timeline), update on intellectual property, analyzer comparisons (improving humidification, stabilizing the baseline, applying clean-up strategy, impact of ionomer content and improving clean-up), proposed operating mode, considerations for testing in real-world conditions (Gen 1 analyzer electronics development, testing partner identified, field trial planning), summary, and future work.

  6. Development of High Temperature SiC Based Hydrogen/Hydrocarbon Sensors with Bond Pads for Packaging

    NASA Technical Reports Server (NTRS)

    Xu, Jennifer C.; Hunter, Gary W.; Chen, Liangyu; Biagi-Labiosa, Azlin M.; Ward, Benjamin J.; Lukco, Dorothy; Gonzalez, Jose M., III; Lampard, Peter S.; Artale, Michael A.; Hampton, Christopher L.

    2011-01-01

    This paper describes efforts towards the transition of existing high temperature hydrogen and hydrocarbon Schottky diode sensor elements to packaged sensor structures that can be integrated into a testing system. Sensor modifications and the technical challenges involved are discussed. Testing of the sensors at 500 C or above is also presented along with plans for future development.

  7. Nickel-Hydrogen Cell Testing Experience, NASA/Goddard Space Flight Center

    NASA Technical Reports Server (NTRS)

    Rao, Gopalakrishna M.

    1999-01-01

    The objectives of the project were to test the Nickel-Hydrogen Cell to: (1) verify the Aerospace Cell Flight Worthiness, (2) Elucidate the Aerospace Cell Thermal Behavior, (3) Develop the Aerospace Battery Assembly Design(s) and In-orbit Battery Management plan(s) and (4) Understand the Aerospace Cell Failure Mechanism. The tests included the LEO and GEO Life cycle tests, Calorimetric Analysis, Destructive Physical analysis, and special tests. Charts show the Mission Profile Cycling Data, Stress Cycling Data. The test data complies with the mission requirements, validating the flight worthiness of batteries. The nominal stress and mission profile cycling performance test shows the charge voltage as high as 1.60V and recharge ratio greater than 1.05. It is apparent that the electrochemical signatures alone do not provide conclusive proof for Nickel precharge. The researchers recommend a gas and positive plate analyses for further confirmation.

  8. Characterization of U.S. Wave Energy Converter (WEC) Test Sites: A Catalogue of Met-Ocean Data, 2nd Edition

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ann R. Dallman; Neary, Vincent S.

    This report presents met-ocean data and wave energy characteristics at eight U.S. wave energy converter (WEC) test and potential deployment sites. Its purpose is to enable the comparison of wave resource characteristics among sites as well as the selection of test sites that are most suitable for a developer's device and that best meet their testing needs and objectives. It also provides essential inputs for the design of WEC test devices and planning WEC tests, including the planning of deployment, and operations and maintenance. For each site, this report catalogues wave statistics recommended in the International Electrotechnical Commission Technical Specimore » cation (IEC 62600-101 TS) on Wave Energy Characterization, as well as the frequency of occurrence of weather windows and extreme sea states, and statistics on wind and ocean currents. It also provides useful information on test site infrastructure and services.« less

  9. Status report, The Public Health and Planning 101 project: strengthening collaborations between the public health and planning professions.

    PubMed

    Mahendra, A; Vo, T; Einstoss, C; Weppler, J; Gillen, P; Ryan, L; Haley, K

    2017-01-01

    Land use planning is a complex field comprised of legislation, policies, processes and tools. A growing body of evidence supports the relationship between land use planning decisions, community design and health. The built environment has been shown to be associated with physical inactivity, obesity, cardiovascular disease, respiratory disease and mental illness. Consequently, there is a growing interest within public health to work with planners on land use planning initiatives such as official plans and transportation master plans. Two surveys were developed: one for public health professionals and the other for planning professionals (survey questions available upon request to the corresponding author). The surveys were pilot tested in two separate focus group sessions with public health and planning professionals. Focus group volunteers helped to validate the surveys by verifying survey questions, design and overall flow. In early 2012, 304 public health professionals and 301 planning professionals completed the two separate surveys, comprising the total survey respondents for each respective profession used to calculate proportions. The survey results represent a convenience sample and are not generalizable to the entire population of public health and planning professionals in Ontario. Results compare survey responses from both groups where appropriate. Most respondents worked either as public health staff (78%) or planners/senior planners (58%). A smaller percentage of public health and planning professionals worked either as managers (15% and 11%, respectively) or directors (5% and 9%, respectively). Health is associated with how communities are planned and built, and the services and resources provided within them. Inspired by the results of our survey and based on user feedback from the pilot tests, a free online training program entitled "Public Health and Planning 101: An Online Course for Public Health and Planning Professionals to Create Healthier Built Environments" was launched in 2016 by OPHA as a collaborative project with OPPI and PHAC. This course is designed to bridge the gaps between the two professions, as well as provide greater opportunities for developing collaborative partnerships to help create and foster healthy built environments.

  10. Reliability Programs for Nonelectronic Designs. Volume 2

    DTIC Science & Technology

    1983-04-01

    afforded. Differ- ences between critical and minor failures must be defined in the RFP so that the test need not be stopped for minor failures. However...not be afforded. Specialized test plans must be developed for nonelectronic equipment. First, differences between critical and minor failures must be...determined prior to initiating the test program so that the test need not be stopped for minor failures. Second, although the test must be interrupted

  11. National Transonic Facility Fan Blade prepreg material characterization tests

    NASA Technical Reports Server (NTRS)

    Klich, P. J.; Richards, W. H.; Ahl, E. L., Jr.

    1981-01-01

    The test program for the basic prepreg materials used in process development work and planned fabrication of the national transonic facility fan blade is presented. The basic prepreg materials and the design laminate are characterized at 89 K, room temperature, and 366 K. Characterization tests, test equipment, and test data are discussed. Material tests results in the warp direction are given for tensile, compressive, fatigue (tension-tension), interlaminar shear and thermal expansion.

  12. Managers Handbook for Software Development

    NASA Technical Reports Server (NTRS)

    Agresti, W.; Mcgarry, F.; Card, D.; Page, J.; Church, V.; Werking, R.

    1984-01-01

    Methods and aids for the management of software development projects are presented. The recommendations are based on analyses and experiences with flight dynamics software development. The management aspects of organizing the project, producing a development plan, estimation costs, scheduling, staffing, preparing deliverable documents, using management tools, monitoring the project, conducting reviews, auditing, testing, and certifying are described.

  13. Science Library of Test Items. Volume Twenty-Three. Geology (Part One). Free Response Testing Program.

    ERIC Educational Resources Information Center

    Hopley, Ken; And Others

    The first of several planned volumes of Free Response Test Items contains geology questions developed by the Assessment and Evaluation Unit of the New South Wales Department of Education. Two additional geology volumes and biology and chemistry volumes are in preparation. The questions in this volume were written and reviewed by practicing…

  14. Software Measurement Guidebook. Version 02.00.02

    DTIC Science & Technology

    1992-12-01

    Compatibility Testing Process .............................. 9-5 Figure 9-3. Development Effort Planning Curve ................................. 9-7 Figure 10-1...requirements, design, code, and test and for analyzing this data. "* Proposal Manager. The person responsible for describing and supporting the estimated...designed, build/elease ranges, variances, and comparisons size growth; costs; completions; and content, units completing test , units with historical

  15. Commentary: Pediatric eHealth Interventions: Common Challenges During Development, Implementation, and Dissemination

    PubMed Central

    Steele, Ric G.; Connelly, Mark A.; Palermo, Tonya M.; Ritterband, Lee M.

    2014-01-01

    Objective To provide an overview of common challenges that pediatric eHealth researchers may encounter when planning, developing, testing, and disseminating eHealth interventions along with proposed solutions for addressing these challenges. Methods The article draws on the existing eHealth literature and the authors’ collective experience in pediatric eHealth research. Results and conclusions The challenges associated with eHealth interventions and their proposed solutions are multifaceted and cut across a number of areas from eHealth program development through dissemination. Collaboration with a range of individuals (e.g., multidisciplinary colleagues, commercial entities, primary stakeholders) is the key to eHealth intervention success. To ensure adequate resources for design, development, and planning for sustainability, a number of public and private sources of funding are available. A study design that addresses ethical concerns and security issues is critical to ensure scientific integrity and intervention dissemination. Table I summarizes key issues to consider during eHealth intervention development, testing, and dissemination. PMID:24816766

  16. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jermoumi, M; Ngwa, W; Dana-Farber Cancer Institute, Brigham and Women's Hospital, Harvard Medical School, Boston, MA

    Purpose: Use of Small Animal Radiation Research Platform (SARRP) systems for conducting state-of-the-art image guided radiotherapy (IGRT) research on small animals has become more common over the past years. The purpose of this work is to develop and test the suitability and performance of a comprehensive quality assurance (QA) phantom for the SARRP. Methods: A QA phantom was developed for carrying out daily, monthly and annual QA tasks including imaging, dosimetry and treatment planning system (TPS) performance evaluation of the SARRP. The QA phantom consists of nine (60×60×5 mm3) KV-energy tissue equivalent solid water slabs that can be employed formore » annual dosimetry QA with film. Three of the top slabs are replaceable with ones incorporating Mosfets or OSLDs arranged in a quincunx pattern, or a slab drilled to accommodate an ion chamber insert. These top slabs are designed to facilitate routine daily and monthly QA tasks such as output constancy, isocenter congruency test, treatment planning system (TPS) QA, etc. One slab is designed with inserts for image QA. A prototype of the phantom was applied to test the performance of the imaging, planning and treatment delivery systems. Results: Output constancy test results showed daily variations within 3%. For isocenter congruency test, the phantom could be used to detect 0.3 mm deviations of the CBCT isocenter from the radiation isocenter. Using the Mosfet in phantom as target, the difference between TPS calculations and measurements was within 5%. Image-quality parameters could also be assessed in terms of geometric accuracy, CT number accuracy, linearity, noise and image uniformity, etc. Conclusion: The developed phantom can be employed as a simple tool for comprehensive performance evaluation of the SARRP. The study provides a reference for development of a comprehensive quality assurance program for the SARRP, with proposed tolerances and frequency of required tests.« less

  17. Environmental screening tools for assessment of infrastructure plans based on biodiversity preservation and global warming (PEIT, Spain)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Garcia-Montero, Luis G., E-mail: luisgonzaga.garcia@upm.e; Lopez, Elena, E-mail: elopez@caminos.upm.e; Monzon, Andres, E-mail: amonzon@caminos.upm.e

    Most Strategic Environmental Assessment (SEA) research has been concerned with SEA as a procedure, and there have been relatively few developments and tests of analytical methodologies. The first stage of the SEA is the 'screening', which is the process whereby a decision is taken on whether or not SEA is required for a particular programme or plan. The effectiveness of screening and SEA procedures will depend on how well the assessment fits into the planning from the early stages of the decision-making process. However, it is difficult to prepare the environmental screening for an infrastructure plan involving a whole country.more » To be useful, such methodologies must be fast and simple. We have developed two screening tools which would make it possible to estimate promptly the overall impact an infrastructure plan might have on biodiversity and global warming for a whole country, in order to generate planning alternatives, and to determine whether or not SEA is required for a particular infrastructure plan.« less

  18. Supporting Real-Time Operations and Execution through Timeline and Scheduling Aids

    NASA Technical Reports Server (NTRS)

    Marquez, Jessica J.; Pyrzak, Guy; Hashemi, Sam; Ahmed, Samia; McMillin, Kevin Edward; Medwid, Joseph Daniel; Chen, Diana; Hurtle, Esten

    2013-01-01

    Since 2003, the NASA Ames Research Center has been actively involved in researching and advancing the state-of-the-art of planning and scheduling tools for NASA mission operations. Our planning toolkit SPIFe (Scheduling and Planning Interface for Exploration) has supported a variety of missions and field tests, scheduling activities for Mars rovers as well as crew on-board International Space Station and NASA earth analogs. The scheduled plan is the integration of all the activities for the day/s. In turn, the agents (rovers, landers, spaceships, crew) execute from this schedule while the mission support team members (e.g., flight controllers) follow the schedule during execution. Over the last couple of years, our team has begun to research and validate methods that will better support users during realtime operations and execution of scheduled activities. Our team utilizes human-computer interaction principles to research user needs, identify workflow processes, prototype software aids, and user test these. This paper discusses three specific prototypes developed and user tested to support real-time operations: Score Mobile, Playbook, and Mobile Assistant for Task Execution (MATE).

  19. Promoting the hydrostatic conceptual change test (HCCT) with four-tier diagnostic test item

    NASA Astrophysics Data System (ADS)

    Purwanto, M. G.; Nurliani, R.; Kaniawati, I.; Samsudin, A.

    2018-05-01

    Hydrostatic Conceptual Change Test (HCCT) is a diagnostic test instrument to identify students’ conception on Hydrostatic field. It is very important to support the learning process in the classroom. Based on that point of view, the researcher decided to develop HCCT instrument test into four-tier test diagnostic items. The resolve of this research is planned as the first step of four-tier test-formatted HCCT development as one of investigative test instrument on Hydrostatic. The research method used the 4D model which has four comprehensive steps: 1) defining, 2) designing, 3) developing and 4) disseminating. The instrument developed has been tried to 30 students in one of senior high schools. The data showed that four-tier- test-formatted HCCT is able to identify student’s conception level of Hydrostatic. In conclusion, the development of four-tier test-formatted HCCT is one of potential diagnostic test instrument that able to classify the category of students who misconception, no understanding, understanding, partial understanding and no codeable about concept of Hydrostatic.

  20. Regenerative Life Support Evaluation

    NASA Technical Reports Server (NTRS)

    Kleiner, G. N.; Thompson, C. D.

    1977-01-01

    This paper describes the development plan and design concept of the Regenerative Life Support Evaluation (RLSE) planned for flight testing in the European Space Agency Spacelab. The development plan encompasses the ongoing advanced life support subsystem and a systems integration effort to evolve concurrently subsystem concepts that perform their function and can be integrated with other subsystems in a flight demonstration of a regenerative life support system. The design concept for RLSE comprises water-electrolysis O2 generation, electrochemically depolarized CO2 removal, and Sabatier CO2 reduction for atmosphere regeneration, urine vapor-compression distillation, and wash-water hyperfiltration for waste-water recovery. The flight demonstration by RLSE is an important step in qualifying the regenerative concepts for life support in space stations.

  1. Servicer system demonstration plan and capability development

    NASA Technical Reports Server (NTRS)

    1987-01-01

    An orbital maneuvering vehicle (OMV) front end kit is defined which is capable of performing in-situ fluid resupply and modular maintenance of free flying spacecraft based on the integrated orbital servicing system (IOSS) concept. The compatibility of the IOSS to perform gas and fluid umbilical connect and disconnect functions utilizing connect systems currently available or in development is addressed. A series of tasks involving on-orbit servicing and the engineering test unit (ETU) of the on-orbit service were studied. The objective is the advancement of orbital servicing by expanding the Spacecraft Servicing Demonstration Plan (SSDP) to include detail demonstration planning using the Multimission Modular Spacecraft (MMS) and upgrading the ETU control.

  2. Overview of U.S. EPA Office of Research and Development’s planned research on analysis and monitoring in fresh and coastal/estuarine environments

    EPA Science Inventory

    This research plan has several objectives: 1) develop new or refine existing chemical, instrument and biological methods for the detection of cyanobacteria and their toxins; test such methods in field studies in both HAB and non HAB environments; 2) determine the method(s) that c...

  3. 78 FR 67348 - Invitation for Public Comment on Draft Test Plan for the High Burnup Dry Storage Cask Research...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-12

    ... will be executed will be added when Dominion Virginia Power, who is part of the Electric Power research... Electric Power Research Institute (EPRI) to document what is planned to be accomplished by the CDP. DOE is... Storage Cask Research and Development Project (CDP) AGENCY: Fuel Cycle Technologies, Office of Nuclear...

  4. Effects of the STOP & LIST Strategy on the Writing Performance of a Sixth Grader with Learning Disabilities

    ERIC Educational Resources Information Center

    Grünke, Matthias; Hatton, Heather

    2017-01-01

    Poor writers generally spend little time developing an outline and otherwise planning written assignments before composing them. Far too many students in elementary and secondary education fall behind in their planning and composition skills because they do not receive appropriate instruction. In this single-case study, we tested the effects of an…

  5. The development of an automated flight test management system for flight test planning and monitoring

    NASA Technical Reports Server (NTRS)

    Hewett, Marle D.; Tartt, David M.; Duke, Eugene L.; Antoniewicz, Robert F.; Brumbaugh, Randal W.

    1988-01-01

    The development of an automated flight test management system (ATMS) as a component of a rapid-prototyping flight research facility for AI-based flight systems concepts is described. The rapid-prototyping facility includes real-time high-fidelity simulators, numeric and symbolic processors, and high-performance research aircraft modified to accept commands for a ground-based remotely augmented vehicle facility. The flight system configuration of the ATMS includes three computers: the TI explorer LX and two GOULD SEL 32/27s.

  6. Community Psychology, Planning, and Learning: A U.S. Perspective on Sustainable Development.

    ERIC Educational Resources Information Center

    Perkins, Douglas D.

    An ecological framework for predicting citizen participation in grassroots community organizations and predicting community disorder problems (such as crime and fear) was developed and tested. The framework, which is called an ecological framework for sustainable community learning and development, delineates the relevant economic, political,…

  7. COURSE: Computer Retrieval for Local District Planning and Evaluation.

    ERIC Educational Resources Information Center

    Wolmut, Peter; Thomas, Gregory

    The Multnomah County Education Service District (MCESD) provides the following support services to the 12 school districts in its jurisdiction in the metropolitan Portland area: (1) curricular support in terms of developing measurable goals and objectives; (2) support for nationally and locally developed group tests; (3) development and field…

  8. Parent and Adolescent Perceptions of Adolescent Career Development Tasks and Vocational Identity

    ERIC Educational Resources Information Center

    Rogers, Mary E.; Creed, Peter A.; Praskova, Anna

    2018-01-01

    We surveyed Australian adolescents and parents to test differences and congruence in perceptions of adolescent career development tasks (career planning, exploration, certainty, and world-of-work knowledge) and vocational identity. We found that, for adolescents (N = 415), career development tasks (not career exploration) explained 48% of the…

  9. Specific recommendations for accurate and direct use of PET-CT in PET guided radiotherapy for head and neck sites

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Thomas, C. M., E-mail: christopher.thomas@gstt.nhs.uk; Convery, D. J.; Greener, A. G.

    2014-04-15

    Purpose: To provide specific experience-based guidance and recommendations for centers wishing to develop, validate, and implement an accurate and efficient process for directly using positron emission tomography-computed tomography (PET-CT) for the radiotherapy planning of head and neck cancer patients. Methods: A PET-CT system was modified with hard-top couch, external lasers and radiotherapy immobilization and indexing devices and was subject to a commissioning and quality assurance program. PET-CT imaging protocols were developed specifically for radiotherapy planning and the image quality and pathway tested using phantoms and five patients recruited into an in-house study. Security and accuracy of data transfer was testedmore » throughout the whole data pathway. The patient pathway was fully established and tested ready for implementation in a PET-guided dose-escalation trial for head and neck cancer patients. Results: Couch deflection was greater than for departmental CT simulator machines. An area of high attenuation in the couch generated image artifacts and adjustments were made accordingly. Using newly developed protocols CT image quality was suitable to maintain delineation and treatment accuracy. Upon transfer of data to the treatment planning system a half pixel offset between PET and CT was observed and corrected. By taking this into account, PET to CT alignment accuracy was maintained below 1 mm in all systems in the data pathway. Transfer of structures delineated in the PET fusion software to the radiotherapy treatment planning system was validated. Conclusions: A method to perform direct PET-guided radiotherapy planning was successfully validated and specific recommendations were developed to assist other centers. Of major concern is ensuring that the quality of PET and CT data is appropriate for radiotherapy treatment planning and on-treatment verification. Couch movements can be compromised, bore-size can be a limitation for certain immobilization techniques, laser positioning may affect setup accuracy and couch deflection may be greater than scanners dedicated to radiotherapy. The full set of departmental commissioning and routine quality assurance tests applied to radiotherapy CT simulators must be carried out on the PET-CT scanner. CT image quality must be optimized for radiotherapy planning whilst understanding that the appearance will differ between scanners and may affect delineation. PET-CT quality assurance schedules will need to be added to and modified to incorporate radiotherapy quality assurance. Methods of working for radiotherapy and PET staff will change to take into account considerations of both parties. PET to CT alignment must be subject to quality control on a loaded and unloaded couch preferably using a suitable emission phantom, and tested throughout the whole data pathway. Data integrity must be tested throughout the whole pathway and a system included to verify that delineated structures are transferred correctly. Excellent multidisciplinary team communication and working is vital, and key staff members on both sides should be specifically dedicated to the project. Patient pathway should be clearly devised to optimize patient care and the resources of all departments. Recruitment of a cohort of patients into a methodology study is valuable to test the quality assurance methods and pathway.« less

  10. Stress Corrosion Testing

    NASA Technical Reports Server (NTRS)

    1985-01-01

    Advanced testing of structural materials was developed by Lewis Research Center and Langley Research Center working with the American Society for Testing and Materials (ASTM). Under contract, Aluminum Company of America (Alcoa) conducted a study for evaluating stress corrosion cracking, and recommended the "breaking load" method which determines fracture strengths as well as measuring environmental degradation. Alcoa and Langley plan to submit the procedure to ASTM as a new testing method.

  11. Development flight tests of the Viking decelerator system.

    NASA Technical Reports Server (NTRS)

    Murrow, H. N.; Eckstrom, C. V.; Henke, D. W.

    1973-01-01

    Significant aspects of a low altitude flight test phase of the overall Viking decelerator system development are given. This test series included nine aircraft drop tests that were conducted at the Joint Parachute Test Facility, El Centro, California, between September 1971 and May 1972. The test technique and analytical planning method utilized to best simulate loading conditions in a low density environment are presented and some test results are shown to assess their adequacy. Performance effects relating to suspension line lengths of 1.7 D sub o with different canopy loadings are noted. System hardware developments are described, in particular the utilization of a fabric deployment mortar cover which remained attached to the parachute canopy. Finally, the contribution of this test series to the overall program is assessed.

  12. Aquatic toxicity of petroleum products and dispersant agents ...

    EPA Pesticide Factsheets

    The U.S. EPA Office of Research and Development has developed baseline data on the ecotoxicity of selected petroleum products and several chemical dispersants as part of its oil spills research program. Two diluted bitumens (dilbits) from the Alberta Tar Sands were tested for acute and chronic toxicity to standard freshwater and marine organisms given their spill potential during shipment within the United States. Separately, two reference crude oils representing a range of characteristics, and their mixtures with four representative dispersants, were tested to evaluate acute and chronic toxicity to marine organisms in support of Subpart J of the U.S. National Contingency Plan. Water accommodated fractions (WAF) of oil were prepared using traditional slow-stir methods and toxicity tests generally followed U.S. EPA standard effluent testing guidelines. WAFs were characterized for petroleum hydrocarbons including alkyl PAH homologs. The results of these studies will assist the U.S. EPA to assess toxicity data for unconventional oils (dilbits), and establish baseline toxicity data for selected crude oils and dispersant in support of planning and response activities. Abstract reporting the results of EPA's oil and dispersant toxicity testing program

  13. Robust and Opportunistic Autonomous Science for a Potential Titan Aerobot

    NASA Technical Reports Server (NTRS)

    Gaines, Daniel M.; Estlin, Tara; Schaffer, Steve; Castano, Rebecca; Elfes, Alberto

    2010-01-01

    We are developing onboard planning and execution technologies to provide robust and opportunistic mission operations for a potential Titan aerobot. Aerobot have the potential for collecting a vast amount of high priority science data. However, to be effective, an aerobot must address several challenges including communication constraints, extended periods without contact with Earth, uncertain and changing environmental conditions, maneuverability constraints and potentially short-lived science opportunities. We are developing the AerOASIS system to develop and test technology to support autonomous science operations for a potential Titan Aerobot. The planning and execution component of AerOASIS is able to generate mission operations plans that achieve science and engineering objectives while respecting mission and resource constraints as well as adapting the plan to respond to new science opportunities. Our technology leverages prior work on the OASIS system for autonomous rover exploration. In this paper we describe how the OASIS planning component was adapted to address the unique challenges of a Titan Aerobot and we describe a field demonstration of the system with the JPL prototype aerobot.

  14. Characterize Human Forward Contamination Project

    NASA Technical Reports Server (NTRS)

    Rucker, Michelle

    2015-01-01

    Let's face it: wherever we go, we will inevitably carry along the little critters that live in and on us. Conventional wisdom has long held that it's unlikely those critters could survive the space environment, but in 2007 microscopic animals called Tardigrades survived exposure to space and in 2008 Cyanobacteria lived for 548 days outside the International Space Station (ISS). But what about the organisms we might reasonably expect a crewed spacecraft to leak or vent? Do we even know what they are? How long might our tiny hitch-hikers survive in close proximity to a warm spacecraft that periodically leaks/vents water or oxygen-and how might they mutate with long-duration exposure? Unlike the Mars rovers that we cleaned once and sent on their way, crew members will provide a constantly regenerating contaminant source. Are we prepared to certify that we can meet forward contamination protocols as we search for life at new destinations? This project has four technical objectives: 1. TEST: Develop a test plan to leverage existing equipment (i.e. ISS) to characterize the kinds of organisms we can reasonably expect pressurized, crewed volumes to vent or leak overboard; as part of testing, we'll need to develop an Extravehicular Activity (EVA)-compatible tool that can withstand the pressure and temperature extremes of space, as well as collect, separate, and store multiple samples; 2. ANALYSIS: Develop an analysis plan to study those organisms in relevant destination environments, including spacecraft-induced conditions; 3. MODEL: Develop a modeling plan to model organism transport mechanisms in relevant destination environments; 4. SHARE: Develop a plan to disseminate findings and integrate recommendations into exploration requirements & ops. In short, we propose a system engineering approach to roadmap the necessary experiments, analysis, and modeling up front--rather than try to knit together disparate chunks of data into a sensible conclusion after the fact.

  15. USGS approach to real-time estimation of earthquake-triggered ground failure - Results of 2015 workshop

    USGS Publications Warehouse

    Allstadt, Kate E.; Thompson, Eric M.; Wald, David J.; Hamburger, Michael W.; Godt, Jonathan W.; Knudsen, Keith L.; Jibson, Randall W.; Jessee, M. Anna; Zhu, Jing; Hearne, Michael; Baise, Laurie G.; Tanyas, Hakan; Marano, Kristin D.

    2016-03-30

    The U.S. Geological Survey (USGS) Earthquake Hazards and Landslide Hazards Programs are developing plans to add quantitative hazard assessments of earthquake-triggered landsliding and liquefaction to existing real-time earthquake products (ShakeMap, ShakeCast, PAGER) using open and readily available methodologies and products. To date, prototype global statistical models have been developed and are being refined, improved, and tested. These models are a good foundation, but much work remains to achieve robust and defensible models that meet the needs of end users. In order to establish an implementation plan and identify research priorities, the USGS convened a workshop in Golden, Colorado, in October 2015. This document summarizes current (as of early 2016) capabilities, research and operational priorities, and plans for further studies that were established at this workshop. Specific priorities established during the meeting include (1) developing a suite of alternative models; (2) making use of higher resolution and higher quality data where possible; (3) incorporating newer global and regional datasets and inventories; (4) reducing barriers to accessing inventory datasets; (5) developing methods for using inconsistent or incomplete datasets in aggregate; (6) developing standardized model testing and evaluation methods; (7) improving ShakeMap shaking estimates, particularly as relevant to ground failure, such as including topographic amplification and accounting for spatial variability; and (8) developing vulnerability functions for loss estimates.

  16. Space Transportation System Cargo projects: inertial stage/spacecraft integration plan. Volume 1: Management plan

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The Kennedy Space Center (KSC) Management System for the Inertial Upper Stage (IUS) - spacecraft processing from KSC arrival through launch is described. The roles and responsibilities of the agencies and test team organizations involved in IUS-S/C processing at KSC for non-Department of Defense missions are described. Working relationships are defined with respect to documentation preparation, coordination and approval, schedule development and maintenance, test conduct and control, configuration management, quality control and safety. The policy regarding the use of spacecraft contractor test procedures, IUS contractor detailed operating procedures and KSC operations and maintenance instructions is defined. Review and approval requirements for each documentation system are described.

  17. KSC facilities status and planned management operations. [for Shuttle launches

    NASA Technical Reports Server (NTRS)

    Gray, R. H.; Omalley, T. J.

    1979-01-01

    A status report is presented on facilities and planned operations at the Kennedy Space Center with reference to Space Shuttle launch activities. The facilities are essentially complete, with all new construction and modifications to existing buildings almost finished. Some activity is still in progress at Pad A and on the Mobile Launcher due to changes in requirements but is not expected to affect the launch schedule. The installation and testing of the ground checkout equipment that will be used to test the flight hardware is now in operation. The Launch Processing System is currently supporting the development of the applications software that will perform the testing of this flight hardware.

  18. Improving proton therapy accessibility through seamless electronic integration of remote treatment planning sites.

    PubMed

    Belard, Arnaud; Dolney, Derek; Zelig, Tochner; McDonough, James; O'Connell, John

    2011-06-01

    Proton radiotherapy is a relatively scarce treatment modality in radiation oncology, with only nine centers currently operating in the United States. Funded by Public Law 107-248, the University of Pennsylvania and the Walter Reed Army Medical Center have developed a remote proton radiation therapy solution with the goals of improving access to proton radiation therapy for Department of Defense (DoD) beneficiaries while minimizing treatment delays and time spent away from home/work (time savings of up to 3 weeks per patient). To meet both Health Insurance Portability and Accountability Act guidelines and the more stringent security restrictions imposed by the DoD, our program developed a hybrid remote proton radiation therapy solution merging a CITRIX server with a JITIC-certified (Joint Interoperability Test Command) desktop videoconferencing unit. This conduit, thoroughly tested over a period of 6 months, integrates both institutions' radiation oncology treatment planning infrastructures into a single entity for DoD patients' treatment planning and delivery. This telemedicine solution enables DoD radiation oncologists and medical physicists the ability to (1) remotely access a proton therapy treatment planning platform, (2) transfer patient plans securely to the University of Pennsylvania patient database, and (3) initiate ad-hoc point-to-point and multipoint videoconferences to dynamically optimize and validate treatment plans. Our robust and secure remote treatment planning solution grants DoD patients not only access to a state-of-the-art treatment modality, but also participation in the treatment planning process by Walter Reed Army Medical Center radiation oncologists and medical physicists. This telemedicine system has the potential to lead to a greater integration of military treatment facilities and/or satellite clinics into regional proton therapy centers.

  19. Environmental impact studies for gas hydrate production test in the Ulleung Basin, East Sea of Korea

    NASA Astrophysics Data System (ADS)

    Ryu, Byong-Jae

    2017-04-01

    To develop potential future energy resources, the Korean National Gas Hydrate Program has been carried out since 2005. The program has been supported by the Ministry of Trade, Industry and Energy (MOTIE), and carried out by the Korea Institute of Geoscience and Mineral Resources (KIGAM), the Korea Gas Corporation (KOGAS) and the Korea National Oil Corporation (KNOC) under the management of Gas Hydrate R&D Organization (GHDO). As a part of this national program, geophysical surveys, geological studies on gas hydrates and two deep drilling expeditions were performed. Gas hydrate-bearing sand layers suitable for production using current technologies were found during the Second Ulleung Basin Gas Hydrate Drilling Expedition (UBGH2) in 2010. Environmental impact studies (EIS) also have been carried out since 2012 by KIGAM in cooperation with domestic and foreign universities and research organizations to ensure safe production test that will be performed in near future. The schedule of production test is being planned. The EIS includes assessment of environmental risks, examination on domestic environmental laws related with production test, collection of basic oceanographic information, and baseline and monitoring surveys. Oceanographic information and domestic environmental laws are already collected and analyzed. Baseline survey has been performed using the in-house developed system, KIGAM Seafloor Observation System (KISOS) since 2013. It will also be performed. R/V TAMHAE II of KIGAM used for KISOS operation. As a part of this EIS, pseudo-3D Chirp survey also was carried out in 2014 to determine the development of fault near the potential testing site. Using KIGAM Seafloor Monitoring System (KIMOS), monitoring survey is planned to be performed from three month before production test to three months after production test. The geophysical survey for determining the change of gas hydrate reservoirs and production-efficiency around the production well would also be conducted before and after the production test. KIMOS will be developed as the planning that was drawn up already. A period for monitoring survey and geophysical survey type, such as AUV or EM surveys will be decided according to the budget.

  20. Final Technical Report: Development of Post-Installation Monitoring Capabilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Polagye, Brian

    2014-03-31

    The development of approaches to harness marine and hydrokinetic energy at large-scale is predicated on the compatibility of these generation technologies with the marine environment. At present, aspects of this compatibility are uncertain. Demonstration projects provide an opportunity to address these uncertainties in a way that moves the entire industry forward. However, the monitoring capabilities to realize these advances are often under-developed in comparison to the marine and hydrokinetic energy technologies being studied. Public Utility District No. 1 of Snohomish County has proposed to deploy two 6-meter diameter tidal turbines manufactured by OpenHydro in northern Admiralty Inlet, Puget Sound, Washington.more » The goal of this deployment is to provide information about the environmental, technical, and economic performance of such turbines that can advance the development of larger-scale tidal energy projects, both in the United States and internationally. The objective of this particular project was to develop environmental monitoring plans in collaboration with resource agencies, while simultaneously advancing the capabilities of monitoring technologies to the point that they could be realistically implemented as part of these plans. In this, the District was joined by researchers at the Northwest National Marine Renewable Energy Center at the University of Washington, Sea Mammal Research Unit, LLC, H.T. Harvey & Associates, and Pacific Northwest National Laboratory. Over a two year period, the project team successfully developed four environmental monitoring and mitigation plans that were adopted as a condition of the operating license for the demonstration project that issued by the Federal Energy Regulatory Commission in March 2014. These plans address nearturbine interactions with marine animals, the sound produced by the turbines, marine mammal behavioral changes associated with the turbines, and changes to benthic habitat associated with colonization of the subsea base support structure. In support of these plans, the project team developed and field tested a strobe-illuminated stereooptical camera system suitable for studying near-turbine interactions with marine animals. The camera system underwent short-term field testing at the proposed turbine deployment site and a multi-month endurance test in shallower water to evaluate the effectiveness of biofouling mitigation measures for the optical ports on camera and strobe pressure housings. These tests demonstrated that the camera system is likely to meet the objectives of the near-turbine monitoring plan and operate, without maintenance, for periods of at least three months. The project team also advanced monitoring capabilities related to passive acoustic monitoring of marine mammals and monitoring of tidal currents. These capabilities will be integrated in a recoverable monitoring package that has a single interface point with the OpenHydro turbines, connects to shore power and data via a wet-mate connector, and can be recovered to the surface for maintenance and reconfiguration independent of the turbine. A logical next step would be to integrate these instruments within the package, such that one instrument can trigger the operation of another.« less

  1. Cryogenic Testing of the Thermal Vacuum Chamber and Ground Support Equipment for the James Webb Space Telescope in Chamber A at Johnson Space Center

    NASA Technical Reports Server (NTRS)

    DiPirro, M.; Homan, J.; Havey, K.; Ousley, W.

    2017-01-01

    The James Webb Space Telescope (JWST) is the largest cryogenic instrument telescope to be developed for space flight. The telescope will be passively cooled to 50 K and the instrument package will be at 40 K with the mid-infrared instrument at 6 K. The final cryogenic test of the Optical Telescope Element (OTE) and Integrated Science Instrument Module (ISIM) as an assembly (OTE + ISIM OTIS) will be performed in the largest 15 K chamber in the world, Chamber A at Johnson Space Center. The planned duration of this test will be 100 days in the middle of 2017. Needless to say, this ultimate test of OTIS, the cryogenic portion of JWST will be crucial in verifying the end-to-end performance of JWST. A repeat of this test would not only be expensive, but would delay the launch schedule (currently October 2018). Therefore a series of checkouts and verifications of the chamber and ground support equipment were planned and carried out between 2012 and 2016. This paper will provide a top-level summary of those tests, trades in coming up with the test plan, as well as some details of individual issues that were encountered and resolved in the course of testing.

  2. Strategic planning in a complex academic environment: lessons from one academic health center.

    PubMed

    Levinson, Wendy; Axler, Helena

    2007-08-01

    Leaders in academic health centers (AHCs) must create a vision for their academic unit embedded in a complex environment. A formal strategic planning process can be valuable to help shape a clear vision taking advantage of potential collaborations and to develop specific achievable long- and short-term goals. The authors describe the steps in a formal strategic planning process and illustrate it with the example of the Department of Medicine at the University of Toronto Faculty of Medicine beginning in 2004. The process included the active participation of over 300 faculty members, trainees, and stakeholders of the department and resulted in broad-based support and leadership for the resulting plan. The authors describe the steps, which include getting started, committing to planning principles, establishing the work plan, understanding the environment, pulling it all together, shaping the vision, testing strategic directions, building effective implementation, and promoting the plan. Articulation of vision, mission, and values informed the plan's development, as well as 10 key principles integral to the plan. Challenges and lessons learned are also described. The final strategic plan is an active core activity of the department, guiding decisions and resource allocation and facilitating measurement of success or shortcomings. The process the authors describe is applicable to multiple academic units, including divisions/sections, departments, or thematic programs in AHCs.

  3. Capabilities, Design, Construction and Commissioning of New Vibration, Acoustic, and Electromagnetic Capabilities Added to the World's Largest Thermal Vacuum Chamber at NASA's Space Power Facility

    NASA Technical Reports Server (NTRS)

    Motil, Susan M.; Ludwiczak, Damian R.; Carek, Gerald A.; Sorge, Richard N.; Free, James M.; Cikanek, Harry A., III

    2011-01-01

    NASA s human space exploration plans developed under the Exploration System Architecture Studies in 2005 included a Crew Exploration Vehicle launched on an Ares I launch vehicle. The mass of the Crew Exploration Vehicle and trajectory of the Ares I coupled with the need to be able to abort across a large percentage of the trajectory generated unprecedented testing requirements. A future lunar lander added to projected test requirements. In 2006, the basic test plan for Orion was developed. It included several types of environment tests typical of spacecraft development programs. These included thermal-vacuum, electromagnetic interference, mechanical vibration, and acoustic tests. Because of the size of the vehicle and unprecedented acoustics, NASA conducted an extensive assessment of options for testing, and as result, chose to augment the Space Power Facility at NASA Plum Brook Station, of the John H. Glenn Research Center to provide the needed test capabilities. The augmentation included designing and building the World s highest mass capable vibration table, the highest power large acoustic chamber, and adaptation of the existing World s largest thermal vacuum chamber as a reverberant electromagnetic interference test chamber. These augmentations were accomplished from 2007 through early 2011. Acceptance testing began in Spring 2011 and will be completed in the Fall of 2011. This paper provides an overview of the capabilities, design, construction and acceptance of this extraordinary facility.

  4. Multicenter Collaborative Quality Assurance Program for the Province of Ontario, Canada: First-Year Results

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Létourneau, Daniel, E-mail: daniel.letourneau@rmp.uh.on.ca; Department of Radiation Oncology, University of Toronto, Toronto, Ontario; McNiven, Andrea

    2013-05-01

    Purpose: The objective of this work was to develop a collaborative quality assurance (CQA) program to assess the performance of intensity modulated radiation therapy (IMRT) planning and delivery across the province of Ontario, Canada. Methods and Materials: The CQA program was designed to be a comprehensive end-to-end test that can be completed on multiple planning and delivery platforms. The first year of the program included a head-and-neck (H and N) planning exercise and on-site visit to acquire dosimetric measurements to assess planning and delivery performance. A single dosimeter was used at each institution, and the planned to measured dose agreementmore » was evaluated for both the H and N plan and a standard plan (linear-accelerator specific) that was created to enable a direct comparison between centers with similar infrastructure. Results: CQA program feasibility was demonstrated through participation of all 13 radiation therapy centers in the province. Planning and delivery was completed on a variety of infrastructure (treatment planning systems and linear accelerators). The planning exercise was completed using both static gantry and rotational IMRT, and planned-to-delivered dose agreement (pass rates) for 3%/3-mm gamma evaluation were greater than 90% (92.6%-99.6%). Conclusions: All centers had acceptable results, but variation in planned to delivered dose agreement for the same planning and delivery platform was noted. The upper end of the range will provide an achievable target for other centers through continued quality improvement, aided by feedback provided by the program through the use of standard plans and simple test fields.« less

  5. Development of Lesson Plans and Student Worksheets Based Socio-Scientific Issues on Pollution Environmental Topic

    NASA Astrophysics Data System (ADS)

    Rahayu, S.; Meyliana, M.; Arlingga, A.; Reny, R.; Siahaan, P.; Hernani, H.

    2017-09-01

    The aim of this study is to develop lesson plans and student worksheets based socio-scientific issues on pollution environmental topic for seventh-grade junior high school students. Environmental pollution topic split into several subtopics namely air pollution, water pollution and soil pollution. The composing of lesson plans were developed based on socio-scientific issues with five stages, namely (1) Motivate; (2) Challenge; (3) Collect scientific evidence; (4) Analyse the evidence; (5) Build knowledge and make connections; and (6) Use evidence. While student worksheets contain articles on socio-scientific issues, practice, and there are a few questions to determine students’ reasoning. The method that is used in this research is research and development (R & D method). Development model used in this study is a model of Plomp that consists of four stages, namely: (1) Initial Research; (2) Design; (3) Realization or Construction; (4) Testing, evaluation and revision; (5) Implementation, while the research was limited to the fourth stage. Lesson plans and student worksheets based on socio-scientific issues was validated through an expert validation. The result showed that lesson plans and student worksheets based socio-scientific issues on pollution theme have a very decent and be able to apply in science classroom.

  6. Ground based simulation of life sciences Spacelab experiments

    NASA Technical Reports Server (NTRS)

    Rummel, J. A.; Alexander, W. C.; Bush, W. H.; Johnston, R. S.

    1978-01-01

    The third in a series of Spacelab Mission Development tests was a joint effort of the Ames Research and Johnson Space Centers to evaluate planned operational concepts of the Space Shuttle life sciences program. A three-man crew conducted 26 experiments and 12 operational tests, utilizing both human and animal subjects. The crew lived aboard an Orbiter/Spacelab mockup for the seven-day simulation. The Spacelab was identical in geometry to the European Space Agency design, complete with removable rack sections and stowage provisions. Communications were controlled as currently planned for operational Shuttle flights. A Science Operations Remote Center at the Ames Research Center was managed by simulated Mission Control and Payload Operation Control Centers at the Johnson Space Center. This paper presents the test objectives, describes the facilities and test program, and outlines the results of this test.

  7. Developing Federal Clinical Care Recommendations for Women.

    PubMed

    Godfrey, Emily M; Tepper, Naomi K; Curtis, Kathryn M; Moskosky, Susan B; Gavin, Loretta E

    2015-08-01

    The provision of family planning services has important health benefits for the U.S. Approximately 25 million women in the U.S. receive contraceptive services annually and 44 million make at least one family planning-related clinical visit each year. These services are provided by private clinicians, as well as publicly funded clinics, including specialty family planning clinics, health departments, Planned Parenthoods, community health centers, and primary care clinics. Recommendations for providing quality family planning services have been published by CDC and the Office of Population Affairs of the DHHS. This paper describes the process used to develop the women's clinical services portion of the new recommendations and the rationale underpinning them. The recommendations define family planning services as contraceptive care, pregnancy testing and counseling, achieving pregnancy, basic infertility care, sexually transmitted disease services, and preconception health. Because many women who seek family planning services have no other source of care, the recommendations also include additional screening services related to women's health, such as cervical cancer screening. These clinical guidelines are aimed at providing the highest-quality care and are designed to establish a national standard for family planning in the U.S. Published by Elsevier Inc.

  8. Site characterization progress report: Yucca Mountain, Nevada. Number 15, April 1--September 30, 1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-04-01

    During the second half of fiscal year 1996, activities at the Yucca Mountain Site Characterization Project (Project) supported the objectives of the revised Program Plan released this period by the Office of Civilian Radioactive Waste Management of the US Department of Energy (Department). Outlined in the revised plan is a focused, integrated program of site characterization, design, engineering, environmental, and performance assessment activities that will achieve key Program and statutory objectives. The plan will result in the development of a license application for repository construction at Yucca Mountain, if the site is found suitable. Activities this period focused on twomore » of the three near-term objectives of the revised plan: updating in 1997 the regulatory framework for determining the suitability of the site for the proposed repository concept and providing information for a 1998 viability assessment of continuing toward the licensing of a repository. The Project has also developed a new design approach that uses the advanced conceptual design published during the last reporting period as a base for developing a design that will support the viability assessment. The initial construction phase of the Thermal Testing Facility was completed and the first phase of the in situ heater tests began on schedule. In addition, phase-one construction was completed for the first of two alcoves that will provide access to the Ghost Dance fault.« less

  9. NASA's Integrated Space Transportation Plan — 3 rd generation reusable launch vehicle technology update

    NASA Astrophysics Data System (ADS)

    Cook, Stephen; Hueter, Uwe

    2003-08-01

    NASA's Integrated Space Transportation Plan (ISTP) calls for investments in Space Shuttle safety upgrades, second generation Reusable Launch Vehicle (RLV) advanced development and third generation RLV and in-space research and technology. NASA's third generation launch systems are to be fully reusable and operation by 2025. The goals for third generation launch systems are to reduce cost by a factor of 100 and improve safety by a factor of 10,000 over current systems. The Advanced Space Transportation Program Office (ASTP) at NASA's Marshall Space Flight Center in Huntsville, AL has the agency lead to develop third generation space transportation technologies. The Hypersonics Investment Area, part of ASTP, is developing the third generation launch vehicle technologies in two main areas, propulsion and airframes. The program's major investment is in hypersonic airbreathing propulsion since it offers the greatest potential for meeting the third generation launch vehicles. The program will mature the technologies in three key propulsion areas, scramjets, rocket-based combined cycle and turbine-based combination cycle. Ground and flight propulsion tests are being planned for the propulsion technologies. Airframe technologies will be matured primarily through ground testing. This paper describes NASA's activities in hypersonics. Current programs, accomplishments, future plans and technologies that are being pursued by the Hypersonics Investment Area under the Advanced Space Transportation Program Office will be discussed.

  10. Automotive Stirling Engine Development Program

    NASA Technical Reports Server (NTRS)

    Nightingale, N.; Ernst, W.; Richey, A.; Simetkosky, M.; Smith, G.; Rohdenburg, C.; Antonelli, M. (Editor)

    1983-01-01

    Program status and plans are discussed for component and technology development; reference engine system design, the upgraded Mod 1 engine; industry test and evaluation; and product assurance. Four current Mod 1 engines reached a total of 2523 operational hours, while two upgraded engines accumulated 166 hours.

  11. Large Liquid Rocket Testing: Strategies and Challenges

    NASA Technical Reports Server (NTRS)

    Rahman, Shamim A.; Hebert, Bartt J.

    2005-01-01

    Rocket propulsion development is enabled by rigorous ground testing in order to mitigate the propulsion systems risks that are inherent in space flight. This is true for virtually all propulsive devices of a space vehicle including liquid and solid rocket propulsion, chemical and non-chemical propulsion, boost stage and in-space propulsion and so forth. In particular, large liquid rocket propulsion development and testing over the past five decades of human and robotic space flight has involved a combination of component-level testing and engine-level testing to first demonstrate that the propulsion devices were designed to meet the specified requirements for the Earth to Orbit launchers that they powered. This was followed by a vigorous test campaign to demonstrate the designed propulsion articles over the required operational envelope, and over robust margins, such that a sufficiently reliable propulsion system is delivered prior to first flight. It is possible that hundreds of tests, and on the order of a hundred thousand test seconds, are needed to achieve a high-reliability, flight-ready, liquid rocket engine system. This paper overviews aspects of earlier and recent experience of liquid rocket propulsion testing at NASA Stennis Space Center, where full scale flight engines and flight stages, as well as a significant amount of development testing has taken place in the past decade. The liquid rocket testing experience discussed includes testing of engine components (gas generators, preburners, thrust chambers, pumps, powerheads), as well as engine systems and complete stages. The number of tests, accumulated test seconds, and years of test stand occupancy needed to meet varying test objectives, will be selectively discussed and compared for the wide variety of ground test work that has been conducted at Stennis for subscale and full scale liquid rocket devices. Since rocket propulsion is a crucial long-lead element of any space system acquisition or development, the appropriate plan and strategy must be put in place at the outset of the development effort. A deferment of this test planning, or inattention to strategy, will compromise the ability of the development program to achieve its systems reliability requirements and/or its development milestones. It is important for the government leadership and support team, as well as the vehicle and propulsion development team, to give early consideration to this aspect of space propulsion and space transportation work.

  12. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dallman, Ann Renee; Neary, Vincent Sinclair

    This report presents met - ocean data and wave energy characteristics at three U.S. wave energy converter (WEC) test and potential deployment sites . Its purpose is to enable the compari son of wave resource characteristics among sites as well as the select io n of test sites that are most suitable for a developer's device and that best meet their testing needs and objectives . It also provides essential inputs for the design of WEC test devices and planning WEC tests, including the planning of deployment and op eration s and maintenance. For each site, this report catalogues wavemore » statistics recommended in the (draft) International Electrotechnical Commission Technical Specification (IEC 62600 - 101 TS) on Wave Energy Characterization, as well as the frequency of oc currence of weather windows and extreme sea states, and statistics on wind and ocean currents. It also provides useful information on test site infrastructure and services .« less

  13. 48 CFR 252.235-7003 - Frequency authorization.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Officer during the initial planning, experimental, or developmental phase of contract performance. (c) The... development, production, construction, testing, or operation of a device for which a radio frequency...

  14. 48 CFR 252.235-7003 - Frequency authorization.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Officer during the initial planning, experimental, or developmental phase of contract performance. (c) The... development, production, construction, testing, or operation of a device for which a radio frequency...

  15. 48 CFR 252.235-7003 - Frequency authorization.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Officer during the initial planning, experimental, or developmental phase of contract performance. (c) The... development, production, construction, testing, or operation of a device for which a radio frequency...

  16. Operational plans for life science payloads - From experiment selection through postflight reporting

    NASA Technical Reports Server (NTRS)

    Mccollum, G. W.; Nelson, W. G.; Wells, G. W.

    1976-01-01

    Key features of operational plans developed in a study of the Space Shuttle era life science payloads program are presented. The data describes the overall acquisition, staging, and integration of payload elements, as well as program implementation methods and mission support requirements. Five configurations were selected as representative payloads: (a) carry-on laboratories - medical emphasis experiments, (b) mini-laboratories - medical/biology experiments, (c) seven-day dedicated laboratories - medical/biology experiments, (d) 30-day dedicated laboratories - Regenerative Life Support Evaluation (RLSE) with selected life science experiments, and (e) Biomedical Experiments Scientific Satellite (BESS) - extended duration primate (Type I) and small vertebrate (Type II) missions. The recommended operational methods described in the paper are compared to the fundamental data which has been developed in the life science Spacelab Mission Simulation (SMS) test series. Areas assessed include crew training, experiment development and integration, testing, data-dissemination, organization interfaces, and principal investigator working relationships.

  17. Time management displays for shuttle countdown

    NASA Technical Reports Server (NTRS)

    Beller, Arthur E.; Hadaller, H. Greg; Ricci, Mark J.

    1992-01-01

    The Intelligent Launch Decision Support System project is developing a Time Management System (TMS) for the NASA Test Director (NTD) to use for time management during Shuttle terminal countdown. TMS is being developed in three phases: an information phase; a tool phase; and an advisor phase. The information phase is an integrated display (TMID) of firing room clocks, of graphic timelines with Ground Launch Sequencer events, and of constraints. The tool phase is a what-if spreadsheet (TMWI) for devising plans for resuming from unplanned hold situations. It is tied to information in TMID, propagates constraints forward and backward to complete unspecified values, and checks the plan against constraints. The advisor phase is a situation advisor (TMSA), which proactively suggests tactics. A concept prototype for TMSA is under development. The TMID is currently undergoing field testing. Displays for TMID and TMWI are described. Descriptions include organization, rationale for organization, implementation choices and constraints, and use by NTD.

  18. 14 CFR 437.25 - Flight test plan.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 4 2014-01-01 2014-01-01 false Flight test plan. 437.25 Section 437.25... TRANSPORTATION LICENSING EXPERIMENTAL PERMITS Requirements to Obtain an Experimental Permit Flight Test Plan § 437.25 Flight test plan. An applicant must— (a) Describe any flight test program, including estimated...

  19. 14 CFR 437.25 - Flight test plan.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 4 2013-01-01 2013-01-01 false Flight test plan. 437.25 Section 437.25... TRANSPORTATION LICENSING EXPERIMENTAL PERMITS Requirements to Obtain an Experimental Permit Flight Test Plan § 437.25 Flight test plan. An applicant must— (a) Describe any flight test program, including estimated...

  20. 14 CFR 437.25 - Flight test plan.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 4 2012-01-01 2012-01-01 false Flight test plan. 437.25 Section 437.25... TRANSPORTATION LICENSING EXPERIMENTAL PERMITS Requirements to Obtain an Experimental Permit Flight Test Plan § 437.25 Flight test plan. An applicant must— (a) Describe any flight test program, including estimated...

Top