DOT National Transportation Integrated Search
2003-09-22
This document presents the Evaluation Teams plan for conducting the evaluation of the FOT in Washington State. A companion document exists for the evaluation of the Utah deployment. This plan includes the experimental design for testing hypotheses...
DOT National Transportation Integrated Search
2003-10-01
The purpose of this document is to expand upon the evaluation components presented in "Computer-aided dispatch--traffic management center field operational test final evaluation plan : WSDOT deployment". This document defines the objective, approach,...
DOT National Transportation Integrated Search
2004-01-01
The purpose of this document is to expand upon the evaluation components presented in "Computer-aided dispatch--traffic management center field operational test final evaluation plan : state of Utah". This document defines the objective, approach, an...
Odor Control Test Report of the Urine Containment Bag (UCB) for Orion Utilization
NASA Technical Reports Server (NTRS)
Casper, Stephanie; Williams, Nichole M. M.
2010-01-01
The purpose of this report is to summarize the conclusions for the odor control test of the Urine Containment Bag (UCB), P/N SDD46107234-306 in an environment simulating a space craft capsule. JSC 65891, Odor Control Test Plan of the Urine Containment Bag (UCB) for Orion Utilization, documents the test plan. The details of the test set-up and data reduction are detailed in the WSTF test report for this test WSTF #10-44500, Odor Control Test Plan of the Urine Containment Bag (UCB) for Orion Utilization,. This document outlines the project conclusions and forward plans with regard to trash containment for Constellation.
The General Mission Analysis Tool (GMAT) System Test Plan
NASA Technical Reports Server (NTRS)
Conway, Darrel J.; Hughes, Steven P.
2007-01-01
This document serves as the System Test Approach for the GMAT Project. Preparation for system testing consists of three major stages: 1) The Test Approach sets the scope of system testing, the overall strategy to be adopted, the activities to be completed, the general resources required and the methods and processes to be used to test the release. It also details the activities, dependencies and effort required to conduct the System Test. 2) Test Planning details the activities, dependencies and effort required to conduct the System Test. 3) Test Cases documents the tests to be applied, the data to be processed, the automated testing coverage and the expected results. This document covers the first two of these items, and established the framework used for the GMAT test case development. The test cases themselves exist as separate components, and are managed outside of and concurrently with this System Test Plan.
Test Plan for the Wake Steering Experiment at the Scaled Wind Farm Technology (SWiFT) Facility.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Naughton, Brian Thomas
This document is a test plan describing the objectives, configuration, procedures, reporting, roles, and responsibilities for conducting the joint Sandia National Laboratories and National Renewable Energy Laboratory Wake Steering Experiment at the Sandia Scaled Wind Farm Technology (SWiFT) facility near Lubbock, Texas in 2016 and 2017 . The purpose of this document is to ensure the test objectives and procedures are sufficiently detailed such that al l involved personnel are able to contribute to the technical success of the test. This document is not intended to address safety explicitly which is addressed in a separate document listed in the referencesmore » titled Sandia SWiFT Facility Site Operations Manual . Both documents should be reviewed by all test personnel.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Brown, Geoffrey Wayne; Leonard, Philip; Hartline, Ernest Leon
High Explosives Science and Technology (M-7) completed all required formulation and testing of Remediated Nitrate Salt (RNS) surrogates on April 27, 2016 as specified in PLAN-TA9-2443 Rev B, "Remediated Nitrate Salt (RNS) Surrogate Formulation and Testing Standard Procedure", released February 16, 2016. This report summarizes the results of the work and also includes additional documentation required in that test plan. All formulation and testing was carried out according to PLAN-TA9-2443 Rev B. The work was carried out in three rounds, with the full matrix of samples formulated and tested in each round. Results from the first round of formulation andmore » testing were documented in memorandum M7-J6-6042, " Results from First Round of Remediated Nitrate Salt Surrogate Formulation and Testing." Results from the second round of formulation and testing were documented in M7-16-6053 , "Results from the Second Round of Remediated Nitrate Salt Surrogate Formulation and Testing." Initial results from the third round were documented in M7-16-6057, "Initial Results from the Third Round of Remediated Nitrate Salt Formulation and Testing."« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Brown, Geoffrey Wayne; Leonard, Philip; Hartline, Ernest Leon
High Explosives and Technology (M-7) completed the second round of formulation and testing of Remediated Nitrate Salt (RNS) surrogates on March 17, 2016. This report summarizes the results of the work and also includes additional documentation required under test plan PLAN-TA9-2443 Rev B, "Remediated Nitrate Salt (RNS) Surrogate Formulation and Testing Standard Procedure", released February 16, 2016. All formulation and testing was carried out according to PLAN-TA9-2443 Rev B. Results from the first round of formulation and testing were documented in memorandum M7-16-6042, "Results from First Round of Remediated Nitrate Salt Surrogate Formulation and Testing."
Transit bus stop pedestrian warning application : acceptance test plan : final report.
DOT National Transportation Integrated Search
2016-10-14
This document is the Acceptance Test Plan for the Transit Bus Stop Pedestrian Warning (TSPW) application. This report describes the test and demonstration plan to verify that the application meets its functional and performance requirements.
Orr, Richard H.; Pings, Vern M.; Pizer, Irwin H.; Olson, Edwin E.; Spencer, Carol C.
1968-01-01
A method of measuring a library's capability for providing the documents its users need has been developed. The library is tested with a representative sample of such documents to determine how long would be required for users to obtain these documents. Test results are expressed in terms of a Capability Index, which has a maximal value of 100 only if all the sample documents are found “on shelf.” Specific tests employing samples of 300 documents have been developed that are appropriate for academic and for “reservoir” biomedical libraries. Realistic field trials have demonstrated that these two tests are practical to administer and that test results are adequately reproducible. When strict comparability is not important, a library can test itself. In assessing a reservoir library, test results are supplemented by data on its typical processing time for interlibrary loan requests. Currently these tests are being used in a national survey. The general method is applicable to other types of libraries, provided appropriate test samples are established. If their limitations are clearly understood, these “Document Delivery Tests” can be valuable tools for planning and managing library services. PMID:5665969
1996-10-01
Document provides a Test Plan for studying and improving techniques tor remediating lead contaminated soils using Phytoremediation . Test Plan for study examining the uptake of lead by Plants in contaminated soils.
1996-10-01
Document provides a Test Plan for studying and improving techniques tor remediating lead contaminated soils using Phytoremediation . Test Plan for study examining the uptake of lead by Plants in contaminated soils.
F14A System Safety Program Plan
1981-09-03
by block number) Electromagnetic Pulse (EMP) Safety Plans Test Program EMP Testing F14 Aircraft Plans 20 ABSTRACT (Continue on reverse side if...compromising completion of the required experimental tasks. This document addresses the safety aspect of performing an Electromagnetic Pulse (EMP) test
Feasibility Study for Low Drag Acoustic Liners Final Report
NASA Technical Reports Server (NTRS)
Riedel, Brian; Wu, Jackie
2017-01-01
This report documents the design and structural analysis as a final deliverable for the Phase 1 contract activity. Also included is a community noise test plan, which is a key deliverable for Phase 2. Finally, a high-level estimate (Phase 3 deliverable) is provided for the work statement of Phases 2-4, which covers the build of two inlet test articles, planning and execution of a flight test with the test inlets, as well as data analysis and final documentation. The two test inlets will be compared to the production baseline inlet configuration. There is also a plan to test one of the inlets "hardwalled" using speed tape or some other similar tape to block the acoustic perforations.
NASA software documentation standard software engineering program
NASA Technical Reports Server (NTRS)
1991-01-01
The NASA Software Documentation Standard (hereinafter referred to as Standard) can be applied to the documentation of all NASA software. This Standard is limited to documentation format and content requirements. It does not mandate specific management, engineering, or assurance standards or techniques. This Standard defines the format and content of documentation for software acquisition, development, and sustaining engineering. Format requirements address where information shall be recorded and content requirements address what information shall be recorded. This Standard provides a framework to allow consistency of documentation across NASA and visibility into the completeness of project documentation. This basic framework consists of four major sections (or volumes). The Management Plan contains all planning and business aspects of a software project, including engineering and assurance planning. The Product Specification contains all technical engineering information, including software requirements and design. The Assurance and Test Procedures contains all technical assurance information, including Test, Quality Assurance (QA), and Verification and Validation (V&V). The Management, Engineering, and Assurance Reports is the library and/or listing of all project reports.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
2014-01-01
The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 105 based on the implementation of the corrective actions. Corrective action investigation (CAI) activities were performed from October 22, 2012, through May 23, 2013, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 105: Area 2 Yucca Flat Atmospheric Test Sites; and in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices.
NASA Technical Reports Server (NTRS)
Paliwoda, L.
1998-01-01
This document contains the procedure and the test results of the Advanced Microwave Sounding Unit-A (AMSU-A) Earth Observing System (EOS) Project, assembly part number 1356008-1, serial number 202, Electromagnetic Interference (EMI) and Electromagnetic Susceptibility (EMC) qualification test. The test was conducted in accordance with the approved EMI/EMC Test Plan/Procedure, Specification number AE-26151/8B, dated 10 September 1998. Aerojet intends that the presentation and submittal of this document, prepared in accordance with the objectives established by the aforementioned Test Plan/Procedure, document number AE-26151/8B, will satisfy the data requirement with respect to the AMSU-A/EOS instrument operational compliance of the EMI/EMC test requirement. Test for the AMSU-A/EOS instrument have been completed and all the requirements per General Interface Requirement Document (GIRD), GSFC 422-11-12-01, for EOS Common Spacecraft/Instruments, paragraph 10.11, were met with the exceptions of the test methods CE03, RE01, and RE02, as described in this document.
General Vehicle Test Plan (GVTP) for Urban Rail Transit Cars
DOT National Transportation Integrated Search
1977-09-01
The General Vehicle Test Plan provides a system for general vehicle testing and for documenting and utilizing data and information in the testing of urban rail transit cars. Test procedures are defined for nine categories: (1) Performance; (2) Power ...
AI-MSG modification work plan. [LMFBR
DOE Office of Scientific and Technical Information (OSTI.GOV)
Page, J.P.
1973-08-20
This document contains the Work Plan for the modification of the AI Steam Generator for tests in Large Leak Test Rig. This Work Plan describes the objectives, scope of work, schedule and manpower, end items, and meetings and reports required for the modification.
Psychometric Testing of the Self-Efficacy for Interdisciplinary Plans of Care Scale.
Molle, Elizabeth; Froman, Robin
2017-01-01
Computerized interdisciplinary plans of care have revitalized nurse-centric care plans into dynamic and meaningful electronic documents. To maximize the benefits of these documents, it is important to understand healthcare professionals' attitudes, specifically their confidence, for making computerized interdisciplinary care plans useful and meaningful documents. The purpose of the study was to test the psychometric properties of the Self-Efficacy for Interdisciplinary Plans of Care instrument intended to measure healthcare professionals' self-efficacy for using such documents. Content validity was assessed by an expert review panel. Content validity indices ranged from 0.75 to 1.00, with a scale CVI of 0.94. A sample of 389 healthcare providers completed the 14-item instrument. Principal axis factoring was used to assess factor structure. The exploratory factor analysis yielded a single-factor structure accounting for 71.76% of covariance. Cronbach internal consistency coefficient for the single factor solution was .97. The corrected item-total correlations ranged from 0.71 to 0.90. The coefficient of stability, during a 2-week period, with a subset of the sample (n = 38), was estimated at 0.82. The results of this study suggest that the Self-Efficacy for Interdisciplinary Plans of Care has sturdy reliability and validity for measuring the self-efficacy of healthcare providers to make computerized interdisciplinary plans of care meaningful and useful documents.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
2013-09-01
This Corrective Action Decision Document/Closure Report presents information supporting the closure of Corrective Action Unit (CAU) 105: Area 2 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada. CAU 105 comprises the following five corrective action sites (CASs): -02-23-04 Atmospheric Test Site - Whitney Closure In Place -02-23-05 Atmospheric Test Site T-2A Closure In Place -02-23-06 Atmospheric Test Site T-2B Clean Closure -02-23-08 Atmospheric Test Site T-2 Closure In Place -02-23-09 Atmospheric Test Site - Turk Closure In Place The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that nomore » further corrective action is needed for CAU 105 based on the implementation of the corrective actions. Corrective action investigation (CAI) activities were performed from October 22, 2012, through May 23, 2013, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 105: Area 2 Yucca Flat Atmospheric Test Sites; and in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices.« less
NASA Technical Reports Server (NTRS)
1973-01-01
The launch operations test and checkout plan is a planning document that establishes all launch site checkout activity, including the individual tests and sequence of testing required to fulfill the development center and KSC test and checkout requirements. This volume contains the launch vehicle test and checkout plan encompassing S-1B, S-4B, IU stage, and ground support equipment tests. The plan is based upon AS-208 flow utilizing a manned spacecraft, LUT 1, and launch pad 39B facilities.
DOT National Transportation Integrated Search
2008-03-01
This document, the AMS Experimental Plan, lays out the scope of analysis that will be conducted through the application of the AMS methodology to the Test Corridor. The specific objectives of the Experimental Plan are: create an AMS framework that id...
Test Plan Procedure for Experiment T-003
DOT National Transportation Integrated Search
1971-05-19
This document defines the type, sequence, and procedural details required to perform each test on the T-003 experiment aerosol analyzer, its subsystems and components. This plan utilizes the flexibility allowed for instruments in criticality category...
NASA Software Documentation Standard
NASA Technical Reports Server (NTRS)
1991-01-01
The NASA Software Documentation Standard (hereinafter referred to as "Standard") is designed to support the documentation of all software developed for NASA; its goal is to provide a framework and model for recording the essential information needed throughout the development life cycle and maintenance of a software system. The NASA Software Documentation Standard can be applied to the documentation of all NASA software. The Standard is limited to documentation format and content requirements. It does not mandate specific management, engineering, or assurance standards or techniques. This Standard defines the format and content of documentation for software acquisition, development, and sustaining engineering. Format requirements address where information shall be recorded and content requirements address what information shall be recorded. This Standard provides a framework to allow consistency of documentation across NASA and visibility into the completeness of project documentation. The basic framework consists of four major sections (or volumes). The Management Plan contains all planning and business aspects of a software project, including engineering and assurance planning. The Product Specification contains all technical engineering information, including software requirements and design. The Assurance and Test Procedures contains all technical assurance information, including Test, Quality Assurance (QA), and Verification and Validation (V&V). The Management, Engineering, and Assurance Reports is the library and/or listing of all project reports.
DOT National Transportation Integrated Search
2017-02-01
This document presents the Concept of Operations (ConOps) Plan for the Automated and Connected Vehicle (AV/CV) Test Bed to Improve Transit, Bicycle, and Pedestrian Safety. As illustrated in Figure 1, the plan presents the overarching vision and goals...
14 CFR 437.25 - Flight test plan.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 4 2011-01-01 2011-01-01 false Flight test plan. 437.25 Section 437.25 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF... reusable suborbital rocket. Operational Safety Documentation ...
14 CFR 437.25 - Flight test plan.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Flight test plan. 437.25 Section 437.25 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF... reusable suborbital rocket. Operational Safety Documentation ...
DOT National Transportation Integrated Search
2008-06-05
This document is the Proof of Concept (POC) Test Plan and procedures that will be used : to verify that hardware and application functionality meet the requirements of the U.S. : Department of Transportation (USDOT) Next Generation 9-1-1 Initiative (...
de Belvis, A G; Biasco, A; Pelone, F; Romaniello, A; De Micco, F; Volpe, M; Ricciardi, W
2009-01-01
The objective of our research is to report on the diffusion of Clinical Governance, as introduced with the National Health Plan 2006-2008, by analysing the planning instruments set up by each Region (Regional Health Plans and Emergency Plans in regions with budget deficit), the organizational frameworks (Atti Aziendali, firm acts), and the surveys on performance and quality of healthcare among the Italian Local Health Units (Health Surveys). Our research was realized on September-December 2007 and consisted of the collection of all retrieved documents available on the web and on the online public access catalog (OPAC SBN) of the National Library Service. Futhermore, each document has been classified and analysed according to Chambers' Clinical Governance definition. A descriptive statistical and inferential analysis by applying the Chi-2 Test was performed to test the correlation between the diffusion of such a classified documents and the geographical partition of each LHU. Our results show a scarce diffusion of Firm acts (43%) and Health Surveys (24.9% of the total). Any remind to Clinical Governance instruments and methods inside each document resulted even poorer among both the organizational and performance surveys and the regional health planning frameworks, respectively.
2009-12-01
or decision unless so designated by other documentation. REPORT DOCUMENTATION PAGE Form Approved OMB No. 0704-0188 Public reporting burden...efficiencies of efferocytosis. In future studies stimulated by this grant, we plan to study mouse models of PPAR activation and depletion to test our...eNampt levels when diet-induced obese mice are switched to a low-calorie diet. Stimulated by these findings, we plan to test causation by restoring
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dietrich, Richard E.
2016-07-01
This document serves as the System-Level Acceptance Test (SLAT) Plan for Site Name, City, Country. This test plan is to provide independent testing of the Radiation Detection System (RDS) installed at Site Name to verify that Customs has been delivered a fully-functioning system as required by all contractual commitments. The system includes all installed hardware and software components. The SLAT plan will verify that separate components are working individually and collectively from a system perspective.
Test and Evaluation Master Plan (TEMP) for the Ports and Waterways Safety System (PAWSS) Project
DOT National Transportation Integrated Search
1997-01-01
This document outlines the Test Concept for the Ports and Waterways Safety System (PAWSS) Project. This Test and Evaluation Master Plan (TEMP) purpose is to reduce risk and ensure the PAWSS project meets all System Specification and Statement of Work...
DOT National Transportation Integrated Search
2004-01-28
This document presents the detailed plan to conduct the Key Informants Interviews Test, one of several test activities to be conducted as part of the national evaluation of the regional, multi-modal 511 Traveler Information System Model Deployment. T...
Electron/proton spectrometer certification documentation analyses
NASA Technical Reports Server (NTRS)
Gleeson, P.
1972-01-01
A compilation of analyses generated during the development of the electron-proton spectrometer for the Skylab program is presented. The data documents the analyses required by the electron-proton spectrometer verification plan. The verification plan was generated to satisfy the ancillary hardware requirements of the Apollo Applications program. The certification of the spectrometer requires that various tests, inspections, and analyses be documented, approved, and accepted by reliability and quality control personnel of the spectrometer development program.
Some guidance on preparing validation plans for the DART Full System Models.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gray, Genetha Anne; Hough, Patricia Diane; Hills, Richard Guy
2009-03-01
Planning is an important part of computational model verification and validation (V&V) and the requisite planning document is vital for effectively executing the plan. The document provides a means of communicating intent to the typically large group of people, from program management to analysts to test engineers, who must work together to complete the validation activities. This report provides guidelines for writing a validation plan. It describes the components of such a plan and includes important references and resources. While the initial target audience is the DART Full System Model teams in the nuclear weapons program, the guidelines are generallymore » applicable to other modeling efforts. Our goal in writing this document is to provide a framework for consistency in validation plans across weapon systems, different types of models, and different scenarios. Specific details contained in any given validation plan will vary according to application requirements and available resources.« less
ACT Plan: Technical Manual. 2013/2014
ERIC Educational Resources Information Center
ACT, Inc., 2013
2013-01-01
This manual contains information about the American College Test (ACT) Plan® program. The principal focus of this manual is to document the Plan program's technical adequacy in light of its intended purposes. This manual supersedes the 2011 edition. The content of this manual responds to requirements of the testing industry as established in the…
DOT National Transportation Integrated Search
2009-12-22
This document presents the University of Michigan Transportation Research Institutes plan to : perform analysis of data collected from the light vehicle platform field operational test of the : Integrated Vehicle-Based Safety Systems (IVBSS) progr...
DOT National Transportation Integrated Search
2009-11-23
This document presents the University of Michigan Transportation Research Institutes plan to perform : analysis of data collected from the heavy truck platform field operational test of the Integrated Vehicle- : Based Safety Systems (IVBSS) progra...
DOT National Transportation Integrated Search
2017-04-28
The document describes the overall process for evaluating Dedicated Short Range Communication (DSRC) Roadside Units (RSU) against USDOT RSU Specification 4.1 in preparation for field evaluation. The Test Cases contained in this document only evaluate...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tan, J; Shi, F; Hrycushko, B
2015-06-15
Purpose: For tandem and ovoid (T&O) HDR brachytherapy in our clinic, it is required that the planning physicist manually capture ∼10 images during planning, perform a secondary dose calculation and generate a report, combine them into a single PDF document, and upload it to a record- and-verify system to prove to an independent plan checker that the case was planned correctly. Not only does this slow down the already time-consuming clinical workflow, the PDF document also limits the number of parameters that can be checked. To solve these problems, we have developed a web-based automatic quality assurance (QA) program. Methods:more » We set up a QA server accessible through a web- interface. A T&O plan and CT images are exported as DICOMRT files and uploaded to the server. The software checks 13 geometric features, e.g. if the dwell positions are reasonable, and 10 dosimetric features, e.g. secondary dose calculations via TG43 formalism and D2cc to critical structures. A PDF report is automatically generated with errors and potential issues highlighted. It also contains images showing important geometric and dosimetric aspects to prove the plan was created following standard guidelines. Results: The program has been clinically implemented in our clinic. In each of the 58 T&O plans we tested, a 14- page QA report was automatically generated. It took ∼45 sec to export the plan and CT images and ∼30 sec to perform the QA tests and generate the report. In contrast, our manual QA document preparation tooks on average ∼7 minutes under optimal conditions and up to 20 minutes when mistakes were made during the document assembly. Conclusion: We have tested the efficiency and effectiveness of an automated process for treatment plan QA of HDR T&O cases. This software was shown to improve the workflow compared to our conventional manual approach.« less
High Burnup Dry Storage Cask Research and Development Project, Final Test Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
2014-02-27
EPRI is leading a project team to develop and implement the first five years of a Test Plan to collect data from a SNF dry storage system containing high burnup fuel.12 The Test Plan defined in this document outlines the data to be collected, and the storage system design, procedures, and licensing necessary to implement the Test Plan.13 The main goals of the proposed test are to provide confirmatory data14 for models, future SNF dry storage cask design, and to support license renewals and new licenses for ISFSIs. To provide data that is most relevant to high burnup fuel inmore » dry storage, the design of the test storage system must mimic real conditions that high burnup SNF experiences during all stages of dry storage: loading, cask drying, inert gas backfilling, and transfer to the ISFSI for multi-year storage.15 Along with other optional modeling, SETs, and SSTs, the data collected in this Test Plan can be used to evaluate the integrity of dry storage systems and the high burnup fuel contained therein over many decades. It should be noted that the Test Plan described in this document discusses essential activities that go beyond the first five years of Test Plan implementation.16 The first five years of the Test Plan include activities up through loading the cask, initiating the data collection, and beginning the long-term storage period at the ISFSI. The Test Plan encompasses the overall project that includes activities that may not be completed until 15 or more years from now, including continued data collection, shipment of the Research Project Cask to a Fuel Examination Facility, opening the cask at the Fuel Examination Facility, and examining the high burnup fuel after the initial storage period.« less
Implementation Plan for Qualification of Sodium-Cooled Fast Reactor Technology Information
DOE Office of Scientific and Technical Information (OSTI.GOV)
Moe, Wayne; Honma, George
This document identifies and discusses implementation elements that can be used to facilitate consistent and systematic evaluation processes relating to quality attributes of technical information (with focus on SFR technology) that will be used to support licensing of advanced reactor designs. Information may include, but is not limited to, design documents for SFRs, research-and-development (R&D) data and associated documents, test plans and associated protocols, operations and test data, international research data, technical reports, and information associated with past U.S. Nuclear Regulatory Commission (NRC) reviews of SFR designs. The approach for determining acceptability of test data, analysis, and/or other technical informationmore » is based on guidance provided in INL/EXT-15-35805, “Guidance on Evaluating Historic Technology Information for Use in Advanced Reactor Licensing.” The implementation plan can be adopted into a working procedure at each of the national laboratories performing data qualification, or by applicants seeking future license application for advanced reactor technology.« less
Minimal Competency Exam Program.
ERIC Educational Resources Information Center
Griffith, E. H.
The high school minimal competency examination described in this document is part one of a three-part program that requires that all students satisfactorily complete tests in reading, language arts, and mathematics prior to receiving a high school diploma. The document outlines the test development and assessment program and describes the plan for…
NASA Processes and Requirements for Conducting Human-in-the-Loop Closed Chamber Tests
NASA Technical Reports Server (NTRS)
Barta, Daniel J.; Montz, Michael E.
2004-01-01
NASA has specific processes and requirements that must be followed for tests involving human subjects to be conducted in a safe and effective manner. There are five distinct phases of test operations. Phase one, the test request phase, consists of those activities related to initiating, processing, reviewing, and evaluating the test request. Phase two, the test preparation phase consists of those activities related to planning, coordinating, documenting, and building up the test. Phase three, the test readiness phase consists of those activities related to verifying and reviewing the planned test operations. Phase four, the test activity phase, consists of all pretest operations, functional checkouts, emergency drills, and test operations. Phase five, the post test activity phase, consists of those activities performed once the test is completed, including briefings, documentation of anomalies, data reduction and archiving, and reporting. Project management processes must be followed for facility modifications and major test buildup, which include six phases: initiation and assessment, requirements evaluation, preliminary design, detailed design, use readiness review (URR) and acceptance. Compliance with requirements for safety and quality assurance are documented throughout the test buildup and test operation processes. Tests involving human subjects must be reviewed by the applicable Institutional Review Board (IRB).
Electronic intermodal supply chain manifest ITS field operational test evaluation plan
DOT National Transportation Integrated Search
2000-09-25
This document is an evaluation plan for a field operational test (FOT) that is based at O'Hare International Airport in Chicago and which will focus on the air cargo component of intermodal freight movements. The objectives of the FOT are to develop,...
DOT National Transportation Integrated Search
2003-10-02
This document is one of a series of working papers that report on progress for the US DOT evaluation for Phase I of the ORANGES field operational test. Each working paper corresponds to a Phase I task. At the conclusion of Phase I, these documents wi...
Human Systems Integration: Unmanned Aircraft Control Station Certification Plan Guidance
NASA Technical Reports Server (NTRS)
2005-01-01
This document provides guidance to the FAA on important human factors considerations that can be used to support the certification of a UAS Aircraft Control Station (ACS). This document provides a synopsis of the human factors analysis, design and test activities to be performed to provide a basis for FAA certification. The data from these analyses, design activities, and tests, along with data from certification/qualification tests of other key components should be used to establish the ACS certification basis. It is expected that this information will be useful to manufacturers in developing the ACS Certification Plan,, and in supporting the design of their ACS.
Fabrication Control Plan for ORNL RH-LOCA ATF Test Specimens to be Irradiated in the ATR
DOE Office of Scientific and Technical Information (OSTI.GOV)
Field, Kevin G.; Howard, Richard; Teague, Michael
2014-06-01
The purpose of this fabrication plan is (1) to summarize the design of a set of rodlets that will be fabricated and then irradiated in the Advanced Test Reactor (ATR) and (2) provide requirements for fabrication and acceptance criteria for inspections of the Light Water Reactor (LWR) – Accident Tolerant Fuels (ATF) rodlet components. The functional and operational (F&OR) requirements for the ATF program are identified in the ATF Test Plan. The scope of this document only covers fabrication and inspections of rodlet components detailed in drawings 604496 and 604497. It does not cover the assembly of these items tomore » form a completed test irradiation assembly or the inspection of the final assembly, which will be included in a separate INL final test assembly specification/inspection document. The controls support the requirements that the test irradiations must be performed safely and that subsequent examinations must provide valid results.« less
NASA Technical Reports Server (NTRS)
Valdez, A.
1999-01-01
This document contains the procedure and the test results of the Advanced Microwave Sounding Unit-A (AMSU-A) Electromagnetic Interference (EMI), Electromagnetic Susceptibility, and Electromagnetic Compatibility (EMC) qualification test for the Meteorological Satellite (METSAT) and the Meteorological Operation Platform (METOP) projects. The test was conducted in accordance with the approved EMI/EMC Test Plan/Procedure, Specification number AE-26151/5D. This document describes the EMI/EMC test performed by Aerojet and it is presented in the following manner: Section-1 contains introductory material and a brief summary of the test results. Section 2 contains more detailed descriptions of the test plan, test procedure, and test results for each type of EMI/EMC test conducted. Section 3 contains supplementary information that includes test data sheets, plots, and calculations collected during the qualification testing.
This document is the Environmental Technology Verification (ETV) Technology Specific Test Plan (TSTP) for evaluation of drinking water treatment equipment utilizing adsorptive media for synthetic organic chemical (SOC) removal. This TSTP is to be used within the structure provid...
NAC Aftermarket Brake Components Project (Secondary Items)
2007-02-06
2. Appendix B. Test Plans and Sample Assignments for Disc Brake Pads and (Foundation) Drum Brake Shoes. 3. Appendix C. Test Plans and Sample...Assignments for Disc Brake Rotors and Drum Brake Drums . 4. Appendix D. Off-vehicle Inertia Dynamometer Test Procedures. 5. Appendix E. “Crack & Fatigue...apples” comparison testing processes, and require project outputs documents to be proofed by actual independent testing; HMMWV-ECV ( disc ) and HEMTT
DOE Office of Scientific and Technical Information (OSTI.GOV)
Duncan, J.B.
1997-01-07
This document provides specific test procedures and instructions to implement the test plan for the preparation and conduct of a cesium removal test, using Hanford Single Shell Tank Saltcake from tanks 24 t -BY- I 10, 24 1 -U- 108, 24 1 -U- 109, 24 1 -A- I 0 1, and 24 t - S-102, in a bench-scale column. The cesium sorbent to be tested is crystalline siticotitanate. The test plan for which this provides instructions is WHC-SD-RE-TP-024, Hanford Single Shell Tank Saltcake Cesium Removal Test Plan.
Single Event Effect (SEE) Test Planning 101
NASA Technical Reports Server (NTRS)
LaBel, Kenneth A.; Pellish, Jonathan; Berg, Melanie D.
2011-01-01
This is a course on SEE Test Plan development. It is an introductory discussion of the items that go into planning an SEE test that should complement the SEE test methodology used. Material will only cover heavy ion SEE testing and not proton, LASER, or other though many of the discussed items may be applicable. While standards and guidelines for how-to perform single event effects (SEE) testing have existed almost since the first cyclotron testing, guidance on the development of SEE test plans has not been as easy to find. In this section of the short course, we attempt to rectify this lack. We consider the approach outlined here as a "living" document: mission specific constraints and new technology related issues always need to be taken into account. We note that we will use the term "test planning" in the context of those items being included in a test plan.
Validation of a Novel Electronic Health Record Patient Portal Advance Care Planning Delivery System.
Bose-Brill, Seuli; Feeney, Michelle; Prater, Laura; Miles, Laura; Corbett, Angela; Koesters, Stephen
2018-06-26
Advance care planning allows patients to articulate their future care preferences should they no longer be able to make decisions on their own. Early advance care planning in outpatient settings provides benefits such as less aggressive care and fewer hospitalizations, yet it is underutilized due to barriers such as provider time constraints and communication complexity. Novel methods, such as patient portals, provide a unique opportunity to conduct advance care planning previsit planning for outpatient care. This follow-up to our pilot study aimed to conduct pragmatic testing of a novel electronic health record-tethered framework and its effects on advance care planning delivery in a real-world primary care setting. Our intervention tested a previsit advance care planning workflow centered around a framework sent via secure electronic health record-linked patient portal in a real-world clinical setting. The primary objective of this study was to determine its impact on frequency and quality of advance care planning documentation. We conducted a pragmatic trial including 2 sister clinical sites, one site implementing the intervention and the other continuing standard care. A total of 419 patients aged between 50 and 93 years with active portal accounts received intervention (n=200) or standard care (n=219). Chart review analyzed the presence of advance care planning and its quality and was graded with previously established scoring criteria based on advance care planning best practice guidelines from multiple nations. A total of 19.5% (39/200) of patients who received previsit planning responded to the framework. We found that the intervention site had statistically significant improvement in new advance care planning documentation rates (P<.01) and quality (P<.01) among all eligible patients. Advance care planning documentation rates increased by 105% (19/39 to 39/39) and quality improved among all patients who engaged in the previsit planning framework (n=39). Among eligible patients aged between 50 and 60 years at the intervention site, advance care planning documentation rates increased by 37% (27/96 to 37/96). Advance care planning documentation rates increased 34% among high users (27/67 to 36/67). Advance care planning previsit planning using a secure electronic health record-supported patient portal framework yielded improvement in the presence of advance care planning documentation, with highest improvement in active patient portal users and patients aged between 50 and 60 years. Targeted previsit patient portal advance care planning delivery in these populations can potentially improve the quality of care in these populations. ©Seuli Bose-Brill, Michelle Feeney, Laura Prater, Laura Miles, Angela Corbett, Stephen Koesters. Originally published in the Journal of Medical Internet Research (http://www.jmir.org), 26.06.2018.
NASA Technical Reports Server (NTRS)
1980-01-01
An updated program plan is presented showing the task descriptions depicting the work, progress, achievements, and the cause of any deviations from the original plan (SC-1), and how this impacted on the original schedule of the program. In addition there is an update documenting all design alterations made during the pre-production phase and a complete up to date set of engineering and manufacturing documentation (CM-1). The purpose of the work in the original plan was to explore, design, develop, test, and deliver 1000 watts of prototype flat plate, photovoltaic modules appropriate for use in applications in the 20 to 500 kilowatt range and which show potential for meeting the 1986 cost goals.
40 CFR 264.1064 - Recordkeeping requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
... facility (e.g., identify the hazardous waste management unit on a facility plot plan). (iii) Type of... schedule as specified in § 264.1033(a)(2). (3) Where an owner or operator chooses to use test data to... device, a performance test plan as specified in § 264.1035(b)(3). (4) Documentation of compliance with...
40 CFR 264.1064 - Recordkeeping requirements.
Code of Federal Regulations, 2014 CFR
2014-07-01
... facility (e.g., identify the hazardous waste management unit on a facility plot plan). (iii) Type of... schedule as specified in § 264.1033(a)(2). (3) Where an owner or operator chooses to use test data to... device, a performance test plan as specified in § 264.1035(b)(3). (4) Documentation of compliance with...
40 CFR 264.1064 - Recordkeeping requirements.
Code of Federal Regulations, 2012 CFR
2012-07-01
... facility (e.g., identify the hazardous waste management unit on a facility plot plan). (iii) Type of... schedule as specified in § 264.1033(a)(2). (3) Where an owner or operator chooses to use test data to... device, a performance test plan as specified in § 264.1035(b)(3). (4) Documentation of compliance with...
40 CFR 264.1064 - Recordkeeping requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
... facility (e.g., identify the hazardous waste management unit on a facility plot plan). (iii) Type of... schedule as specified in § 264.1033(a)(2). (3) Where an owner or operator chooses to use test data to... device, a performance test plan as specified in § 264.1035(b)(3). (4) Documentation of compliance with...
NASA Technical Reports Server (NTRS)
1981-01-01
The Kennedy Space Center (KSC) Management System for the Inertial Upper Stage (IUS) - spacecraft processing from KSC arrival through launch is described. The roles and responsibilities of the agencies and test team organizations involved in IUS-S/C processing at KSC for non-Department of Defense missions are described. Working relationships are defined with respect to documentation preparation, coordination and approval, schedule development and maintenance, test conduct and control, configuration management, quality control and safety. The policy regarding the use of spacecraft contractor test procedures, IUS contractor detailed operating procedures and KSC operations and maintenance instructions is defined. Review and approval requirements for each documentation system are described.
DOT National Transportation Integrated Search
2016-08-04
This document is the Task 7 Application Deployment Plan deliverable for the New York City Connected Vehicle Pilot Deployment. It describes the process that the deployment team will follow to acquire and test the connected vehicle safety applications....
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-06
... Documents Access and Management System (ADAMS): You may access publicly available documents online in the... Management Plans for Digital Computer Software used in Safety Systems of Nuclear Power Plants,'' issued for... Used in Safety Systems of Nuclear Power Plants AGENCY: Nuclear Regulatory Commission. ACTION: Revision...
Seismology software: state of the practice
NASA Astrophysics Data System (ADS)
Smith, W. Spencer; Zeng, Zheng; Carette, Jacques
2018-05-01
We analyzed the state of practice for software development in the seismology domain by comparing 30 software packages on four aspects: product, implementation, design, and process. We found room for improvement in most seismology software packages. The principal areas of concern include a lack of adequate requirements and design specification documents, a lack of test data to assess reliability, a lack of examples to get new users started, and a lack of technological tools to assist with managing the development process. To assist going forward, we provide recommendations for a document-driven development process that includes a problem statement, development plan, requirement specification, verification and validation (V&V) plan, design specification, code, V&V report, and a user manual. We also provide advice on tool use, including issue tracking, version control, code documentation, and testing tools.
Seismology software: state of the practice
NASA Astrophysics Data System (ADS)
Smith, W. Spencer; Zeng, Zheng; Carette, Jacques
2018-02-01
We analyzed the state of practice for software development in the seismology domain by comparing 30 software packages on four aspects: product, implementation, design, and process. We found room for improvement in most seismology software packages. The principal areas of concern include a lack of adequate requirements and design specification documents, a lack of test data to assess reliability, a lack of examples to get new users started, and a lack of technological tools to assist with managing the development process. To assist going forward, we provide recommendations for a document-driven development process that includes a problem statement, development plan, requirement specification, verification and validation (V&V) plan, design specification, code, V&V report, and a user manual. We also provide advice on tool use, including issue tracking, version control, code documentation, and testing tools.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Yoo, Jun Soo; Choi, Yong Joon
The RELAP-7 code verification and validation activities are ongoing under the code assessment plan proposed in the previous document (INL-EXT-16-40015). Among the list of V&V test problems in the ‘RELAP-7 code V&V RTM (Requirements Traceability Matrix)’, the RELAP-7 7-equation model has been tested with additional demonstration problems and the results of these tests are reported in this document. In this report, we describe the testing process, the test cases that were conducted, and the results of the evaluation.
South Florida freight advanced traveler information system.
DOT National Transportation Integrated Search
2013-10-01
This Demonstration Plan has been prepared to provide guidance and a common definition to all parties of the testing program that will be conducted for the South Florida FRATIS Demonstration Project. More specifically, this document provides: Plan...
NASA Technical Reports Server (NTRS)
Olsen, C. D.
1972-01-01
Planning documentation is presented covering the specific areas of project engineering and development, management, facilities, manufacturing, logistic support maintenance, and test and product assurance.
Space Shuttle wind tunnel testing program
NASA Technical Reports Server (NTRS)
Whitnah, A. M.; Hillje, E. R.
1984-01-01
A major phase of the Space Shuttle Vehicle (SSV) Development Program was the acquisition of data through the space shuttle wind tunnel testing program. It became obvious that the large number of configuration/environment combinations would necessitate an extremely large wind tunnel testing program. To make the most efficient use of available test facilities and to assist the prime contractor for orbiter design and space shuttle vehicle integration, a unique management plan was devised for the design and development phase. The space shuttle program is reviewed together with the evolutional development of the shuttle configuration. The wind tunnel testing rationale and the associated test program management plan and its overall results is reviewed. Information is given for the various facilities and models used within this program. A unique posttest documentation procedure and a summary of the types of test per disciplines, per facility, and per model are presented with detailed listing of the posttest documentation.
Specific test and evaluation plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hays, W.H.
1998-03-20
The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AX-B Valve Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system`s performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP). Testing includes Validations and Verifications (e.g., Commercial Grade Item Dedication activities), Factory Acceptance Tests (FATs), installation tests and inspections, Construction Acceptance Tests (CATs), Acceptance Test Procedures (ATPs), Pre-Operational Test Procedures (POTPs), andmore » Operational Test Procedures (OTPs). It should be noted that POTPs are not required for testing of the transfer line addition. The STEP will be utilized in conjunction with the TEP for verification and validation.« less
San Francisco urban partnership agreement, national evaluation : telecommuting/TDM data test plan.
DOT National Transportation Integrated Search
2002-04-01
The Standards Requirements Document (SRD) collects information from the other National ITS Architecture program documents and reorganizes it in a manner intended to support the development of critical ITS standards. The key results in the SRD a...
In situ gas treatment technology demonstration test plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Thornton, E.C.; Miller, R.D.
1996-02-16
This document defines the objectives and requirements associated with undertaking a field demonstration of an in situ gas treatment appoach to remediation chromate-contaminated soil. The major tasks presented in this plan include the design and development of the surface gas treatment system, performance of permitting activities, and completion of site preparation and field testing activities.
Pilot-scale treatability test plan for the 200-BP-5 operable unit
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This document presents the treatability test plan for pilot-scale pump and treat testing at the 200-BP-5 Operable Unit. This treatability test plan has been prepared in response to an agreement between the U.S. Department of Energy (DOE), the U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology), as documented in Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1989a) Change Control Form M-13-93-03 (Ecology et al. 1994) and a recent 200 NPL Agreement Change Control Form (Appendix A). The agreement also requires that, following completion of the activities described in thismore » test plan, a 200-BP-5 Operable Unit Interim Remedial Measure (IRM) Proposed Plan be developed for use in preparing an Interim Action Record of Decision (ROD). The IRM Proposed Plan will be supported by the results of this treatability test plan, as well as by other 200-BP-5 Operable Unit activities (e.g., development of a qualitative risk assessment). Once issued, the Interim Action ROD will specify the interim action(s) for groundwater contamination at the 200-BP-5 Operable Unit. The treatability test approach is to conduct a pilot-scale pump and treat test for each of the two contaminant plumes associated with the 200-BP-5 Operable Unit. Primary contaminants of concern are {sup 99}Tc and {sup 60}Co for underwater affected by past discharges to the 216-BY Cribs, and {sup 90}Sr, {sup 239/240}Pu, and Cs for groundwater affected by past discharges to the 216-B-5 Reverse Well. The purpose of the pilot-scale treatability testing presented in this testplan is to provide the data basis for preparing an IRM Proposed Plan. To achieve this objective, treatability testing must: Assess the performance of groundwater pumping with respect to the ability to extract a significant amount of the primary contaminant mass present in the two contaminant plumes.« less
Biomedical programs operations plans
NASA Technical Reports Server (NTRS)
Walbrecher, H. F.
1974-01-01
Operational guidelines for the space shuttle life sciences payloads are presented. An operational assessment of the medical experimental altitude test for Skylab, and Skylab life sciences documentation are discussed along with the operations posture and collection of space shuttle operational planning data.
DOT National Transportation Integrated Search
2002-04-01
The Theory of Operations document is one of a series of deliverables documenting the National Intelligent Transportation System (ITS) Architecture developed under contract to the U.S. Department of Transportation (DOT). The Theory of Operations Docum...
DOT National Transportation Integrated Search
2016-08-01
This document describes the Deployment Plan for the New York City Department of Transportation (NYC) Connected Vehicle Pilot Deployment (CVPD) Project. This plan describes the approach to complete Phase 2 Design/Build/Test, and Phase 3 Operate and Ma...
A pilot study on the evaluation of medical student documentation: assessment of SOAP notes.
Seo, Ji-Hyun; Kong, Hyun-Hee; Im, Sun-Ju; Roh, HyeRin; Kim, Do-Kyong; Bae, Hwa-Ok; Oh, Young-Rim
2016-06-01
The purpose of this study was evaluation of the current status of medical students' documentation of patient medical records. We checked the completeness, appropriateness, and accuracy of 95 Subjective-Objective-Assessment-Plan (SOAP) notes documented by third-year medical students who participated in clinical skill tests on December 1, 2014. Students were required to complete the SOAP note within 15 minutes of an standard patient (SP)-encounter with a SP complaining rhinorrhea and warring about meningitis. Of the 95 SOAP notes reviewed, 36.8% were not signed. Only 27.4% documented the patient's symptoms under the Objective component, although all students completed the Subjective notes appropriately. A possible diagnosis was assessed by 94.7% students. Plans were described in 94.7% of the SOAP notes. Over half the students planned workups (56.7%) for diagnosis and treatment (52.6%). Accurate documentation of the symptoms, physical findings, diagnoses, and plans were provided in 78.9%, 9.5%, 62.1%, and 38.0% notes, respectively. Our results showed that third-year medical students' SOAP notes were not complete, appropriate, or accurate. The most significant problems with completeness were the omission of students' signatures, and inappropriate documentation of the physical examinations conducted. An education and assessment program for complete and accurate medical recording has to be developed.
14 CFR 77.75 - Establishment of antenna farm areas.
Code of Federal Regulations, 2011 CFR
2011-01-01
... indicated on an FAA planning document or military service military airport planning document. Planned or...; any other FAA planning document, or military service military airport planning document. Public use... layout plan, a military service approved military airport layout plan, or by any planning document...
Acadia National Park ITS field operational test : evaluation plan
DOT National Transportation Integrated Search
2000-08-01
This document presents the plan for evaluating technologies known as Intelligent Transportation Systems (ITS) that will be implemented in Acadia National Park and Mount Desert Island, Maine. Acadia National Park was selected as a site for an ITS Fiel...
Freight Advanced Traveler Information System (FRATIS) : Dallas-Fort Worth demonstration plan.
DOT National Transportation Integrated Search
2013-06-01
This document describes the Demonstration Plan for the FRATIS system. The demonstration component of this task will serve to test the technical feasibility of the FRATIS prototype while also facilitating the collection of baseline and performance dat...
Wave Energy Prize - 1/50th Testing - Waveswing America
Wesley Scharmen
2016-01-22
This submission of data includes all the 1/50th scale testing data completed on the Wave Energy Prize for the Waveswing America team, and includes: 1/50th test data (raw & processed) 1/50th test data video and pictures 1/50th Test plans and testing documents Results
Single Event Effects (SEE) Testing: Practical Approach to Test Plans
NASA Technical Reports Server (NTRS)
LaBel, Kenneth A.; Pellish, Jonathan Allen; Berg, Melanie D.
2014-01-01
While standards and guidelines for performing SEE testing have existed for several decades, guidance for developing SEE test plans has not been as easy to find. In this presentation, the variety of areas that need to be considered ranging from resource issues (funds, personnel, schedule) to extremely technical challenges (particle interaction and circuit application), shall be discussed. Note: we consider the approach outlined here as a "living" document: Mission-specific constraints and new technology related issues always need to be taken into account.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vargo, G.F. Jr.
1994-10-11
The DOE Standard defines the configuration management program by the five basic program elements of ``program management,`` ``design requirements,`` ``document control,`` ``change control,`` and ``assessments,`` and the two adjunct recovery programs of ``design reconstitution,`` and ``material condition and aging management. The C-M model of five elements and two adjunct programs strengthen the necessary technical and administrative control to establish and maintain a consistent technical relationship among the requirements, physical configuration, and documentation. Although the DOE Standard was originally developed for the operational phase of nuclear facilities, this plan has the flexibility to be adapted and applied to all life-cycle phasesmore » of both nuclear and non-nuclear facilities. The configuration management criteria presented in this plan endorses the DOE Standard and has been tailored specifically to address the technical relationship of requirements, physical configuration, and documentation during the full life-cycle of the 101-SY Hydrogen Mitigation Test Project Mini-Data Acquisition and Control System of Tank Waste Remediation System.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
PALMER, M.E.
1999-09-21
Test Plan HNF-4351 defines testing requirements for installation of a new server in the WRAP Facility. This document shows the results of the test reports on the DMS-Y2K and DMS-F81 (Security) systems.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Malkewicz, Nicholas; Kirksey, Jim; Finley, Robert
2015-05-01
Executive Summary The Illinois Basin – Decatur Project (IBDP) is managed by the Midwest Geological Sequestration Consortium (MGSC) and is led by the Illinois State Geological Survey (ISGS) at the University of Illinois. The project site is located on the Archer Daniels Midland Company (ADM) property in Decatur, Illinois, and is a fully integrated carbon capture and storage (CCS) project that uses CO₂ captured from the ethanol-producing fermentation process at the ADM corn-processing plant (Finley et. al., 2013). IBDP has a goal of injecting one million tonnes of CO₂ into the basal sands of the Mt. Simon Sandstone over amore » three-year period. This is a multifaceted project, and this report details the planning and results of the drilling, completions, well testing, log data acquisition, and the Health, Safety, and Environment (HSE) aspects of the project. Three deep wells were planned for the IBDP: • The injection well: Injection Well #1 (CCS1); • The monitoring well (both in-zone and above seal): Verification Well #1 (VW1); and • The geophone monitoring well: Geophysical Monitoring Well #1 (GM1). The detailed plans for these wells are attached to the appendices of this document. The wells were drilled successfully with little deviation from the original plans. The biggest change from the plan to execution was the need to adjust for larger-than-expected loss of circulation in the Potosi section of the Knox Formation. The completions reports also attached to this document detail the well constructions as they were actually built. Injectivity testing was carried out, and the perforating plans were adjusted based on the results. Additional perforations and acidizing were performed as a result of the injectivity testing. The testing plans are detailed in this report along with the actual testing results. The injectivity testing results were used in the modeling and simulation efforts. Detailed HSE plans were developed and implemented during the planning and execution phases of the project. The implementation included an HSE Bridging Document, which served to unify the HSE policies of the project partners and key subcontractors. The HSE plan and actual HSE results are presented in this document. There were no recordable HSE incidents during the project. A detailed logging program was developed based on project needs. The log data were acquired in accordance with the plan, and both the plan and log results are presented in this report. Log data were heavily utilized by the research staff, modelers, reservoir engineers, and for technical and permitting efforts. 5 Several key lessons were learned during the project: • Safety in operations and execution is paramount and is only achieved through proper planning and behavior control. The certainty of this was reinforced through implementation of this lesson and the resultant flawless HSE performance during the project. • Losses of drilling fluid circulation were larger than anticipated within the Potosi Formation. Circulation was only recovered through cementing the loss zones. • When possible, minimizing complexity in permit requirements and well designs is preferable. • The size of the wells were outside of the standard experience and expertise typical within the basin, and therefore required substantial planning and ramp-up of contractors and partners to meet project objectives. • With multiple stakeholders and research partners, establishing objectives and requirements early and adhering to change request procedures throughout the project are critical to manage competing data and sampling objectives that may be detrimental to overall progress. The well construction and completion operations were successfully executed, with all wells built in a manner that achieved excellent wellbore integrity. Log planning involved a number of stakeholders and technical specialists. Data collection from logging, coring, and testing was excellent. Time and effort spent with the associated contractors and suppliers to develop a well plan beyond normal scope proved highly successful, resulting in a well-construction and completion project that surpassed expectations. The world-class HSE results also demonstrate the commitment of all stakeholders in the project. The details follow in the body of this document« less
Helicopter precision approach capability using the Global Positioning System
NASA Technical Reports Server (NTRS)
Kaufmann, David N.
1992-01-01
The period between 1 July and 31 December, 1992, was spent developing a research plan as well as a navigation system document and flight test plan to investigate helicopter precision approach capability using the Global Positioning System (GPS). In addition, all hardware and software required for the research was acquired, developed, installed, and verified on both the test aircraft and the ground-based reference station.
AVCS Simulator Test Plan and Design Guide
NASA Technical Reports Server (NTRS)
Shelden, Stephen
2001-01-01
Internal document for communication of AVCS direction and documentation of simulator functionality. Discusses methods for AVCS simulation evaluation of pilot functions, implementation strategy of varying functional representation of pilot tasks (by instantiations of a base AVCS to reasonably approximate the interface of various vehicles -- e.g. Altair, GlobalHawk, etc.).
Wave Energy Prize - 1/50th Testing - Iowec
Wesley Scharmen
2015-12-18
This submission of data includes all the 1/50th scale testing data completed on the Wave Energy Prize for the Iowec team, and includes: 1/50th test data (raw & processed) 1/50th test data video and pictures 1/50th Test plans and testing documents SSTF_Submission (summarized results)
Wave Energy Prize - 1/50th Testing - Oscilla Power
Wesley Scharmen
2016-01-08
This submission of data includes all the 1/50th scale testing data completed on the Wave Energy Prize for the Oscilla Power team, and includes: 1/50th test data (raw & processed) 1/50th test data video and pictures 1/50th Test plans and testing documents SSTF_Submission (summarized results)
Wave Energy Prize - 1/50th Testing - SEWEC
Wesley Scharmen
2015-12-11
This submission of data includes all the 1/50th scale testing data completed on the Wave Energy Prize for the SEWEC team, and includes: 1/50th test data (raw & processed) 1/50th test data video and pictures 1/50th Test plans and testing documents SSTF_Submission (summarized results)
Wave Energy Prize - 1/50th Testing - Principle Power
Wesley Scharmen
2016-01-08
This submission of data includes all the 1/50th scale testing data completed on the Wave Energy Prize for the Principle Power team, and includes: 1/50th test data (raw & processed) 1/50th test data video and pictures 1/50th Test plans and testing documents SSTF_Submission (summarized results)
Wave Energy Prize - 1/50th Testing - WECCA
Wesley Scharmen
2016-01-15
This submission of data includes all the 1/50th scale testing data completed on the Wave Energy Prize for the WECCA team, and includes: 1/50th test data (raw & processed) 1/50th test data video and pictures 1/50th Test plans and testing documents SSTF_Submission (summarized results)
Wave Energy Prize - 1/50th Testing - Team Flapper/Harvest
Wesley Scharmen
2015-12-18
This submission of data includes all the 1/50th scale testing data completed on the Wave Energy Prize for the Team Flapper/Harvest, and includes: 1/50th test data (raw & processed) 1/50th test data video and pictures 1/50th Test plans and testing documents SSTF_Submission (summarized results)
Wave Energy Prize - 1/50th Testing - Sea Potential
Wesley Scharmen
2015-12-04
This submission of data includes all the 1/50th scale testing data completed on the Wave Energy Prize for the Sea Potential team, and includes: 1/50th test data (raw & processed) 1/50th test data video and pictures 1/50th Test plans and testing documents SSTF_Submission (summarized results)
Wave Energy Prize - 1/50th Testing - Mocean Energy
Wesley Scharmen
2016-01-08
This submission of data includes all the 1/50th scale testing data completed on the Wave Energy Prize for the Mocean Energy team, and includes: 1/50th test data (raw & processed) 1/50th test data video and pictures 1/50th Test plans and testing documents SSTF_Submission (summarized results)
Wave Energy Prize - 1/50th Testing - CalWave
Wesley Scharmen
2016-01-15
This submission of data includes all the 1/50th scale testing data completed on the Wave Energy Prize for the CalWave team, and includes: 1/50th test data (raw & processed) 1/50th test data video and pictures 1/50th Test plans and testing documents SSTF_Submission (summarized results)
Wave Energy Prize - 1/50th Testing - AquaHarmonics
Wesley Scharmen
2016-01-15
This submission of data includes all the 1/50th scale testing data completed on the Wave Energy Prize for the AquaHarmonics team, and includes: 1/50th test data (raw & processed) 1/50th test data video and pictures 1/50th Test plans and testing documents SSTF_Submission (summarized results)
[Multimodal document management in radiotherapy].
Fahrner, H; Kirrmann, S; Röhner, F; Schmucker, M; Hall, M; Heinemann, F
2013-12-01
After incorporating treatment planning and the organisational model of treatment planning in the operating schedule system (BAS, "Betriebsablaufsystem"), complete document qualities were embedded in the digital environment. The aim of this project was to integrate all documents independent of their source (paper-bound or digital) and to make content from the BAS available in a structured manner. As many workflow steps as possible should be automated, e.g. assigning a document to a patient in the BAS. Additionally it must be guaranteed that at all times it could be traced who, when, how and from which source documents were imported into the departmental system. Furthermore work procedures should be changed that the documentation conducted either directly in the departmental system or from external systems can be incorporated digitally and paper document can be completely avoided (e.g. documents such as treatment certificate, treatment plans or documentation). It was a further aim, if possible, to automate the removal of paper documents from the departmental work flow, or even to make such paper documents superfluous. In this way patient letters for follow-up appointments should automatically generated from the BAS. Similarly patient record extracts in the form of PDF files should be enabled, e.g. for controlling purposes. The available document qualities were analysed in detail by a multidisciplinary working group (BAS-AG) and after this examination and assessment of the possibility of modelling in our departmental workflow (BAS) they were transcribed into a flow diagram. The gathered specifications were implemented in a test environment by the clinical and administrative IT group of the department of radiation oncology and subsequent to a detailed analysis introduced into clinical routine. The department has succeeded under the conditions of the aforementioned criteria to embed all relevant documents in the departmental workflow via continuous processes. Since the completion of the concepts and the implementation in our test environment 15,000 documents were introduced into the departmental workflow following routine approval. Furthermore approximately 5000 appointment letters for patient aftercare per year were automatically generated by the BAS. In addition patient record extracts in the form of PDF files for the medical services of the healthcare insurer can be generated.
Engineering Task Plan for the Ultrasonic Inspection of Hanford Double Shell Tanks (DST) FY2000
DOE Office of Scientific and Technical Information (OSTI.GOV)
JENSEN, C.E.
2000-01-10
This document facilitates the ultrasonic examination of Hanford double-shell tanks. Included are a plan for engineering activities (individual responsibilities), plan for performance demonstration testing, and a plan for field activities (tank inspection). Also included are a Statement of Work for contractor performance of the work and a protocol to be followed should tank flaws that exceed the acceptance criteria be discovered.
The development of a program analysis environment for Ada
NASA Technical Reports Server (NTRS)
Brown, David B.; Carlisle, Homer W.; Chang, Kai-Hsiung; Cross, James H.; Deason, William H.; Haga, Kevin D.; Huggins, John R.; Keleher, William R. A.; Starke, Benjamin B.; Weyrich, Orville R.
1989-01-01
A unit level, Ada software module testing system, called Query Utility Environment for Software Testing of Ada (QUEST/Ada), is described. The project calls for the design and development of a prototype system. QUEST/Ada design began with a definition of the overall system structure and a description of component dependencies. The project team was divided into three groups to resolve the preliminary designs of the parser/scanner: the test data generator, and the test coverage analyzer. The Phase 1 report is a working document from which the system documentation will evolve. It provides history, a guide to report sections, a literature review, the definition of the system structure and high level interfaces, descriptions of the prototype scope, the three major components, and the plan for the remainder of the project. The appendices include specifications, statistics, two papers derived from the current research, a preliminary users' manual, and the proposal and work plan for Phase 2.
System integration test plan for HANDI 2000 business management system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wilson, D.
This document presents the system integration test plan for the Commercial-Off-The-Shelf, PassPort and PeopleSoft software, and custom software created to work with the COTS products. The PP software is an integrated application for AP, Contract Management, Inventory Management, Purchasing and Material Safety Data Sheet. The PS software is an integrated application for Project Costing, General Ledger, Human Resources/Training, Payroll, and Base Benefits.
HARD PAN I Test Series Test and Instrumentation Plans. Volume I. Test Plan
1975-12-01
t.jw .y..,,^.,^,. Ä!»,,«-* :,,; .trwev* ’ UNCLASSIFIED SECURITY CLASSIFICATION OF THIS PAGt ’Wh&n Data Entered) J?)REPORT DOCUMENTATION PAGE...to facility-l—> DO ,: FORM A’J 73 1473 EDITION OF 1 NOV 65 15 OBSOLETE UNCLASSIFIED fNW SECURITY CLASSIFICATION OF THIS PAGE (Wfien Data Entered...y^o ... — ppiiw’.^y.-.j-w... v»t \\ UNCLASSIFIED iCURITY CLASSIFICATION CF THIS PAGEfWlon Data Entered) design, modification, and hardness
Intermediate load modules for test and evaluation
NASA Technical Reports Server (NTRS)
1984-01-01
Photovoltaic modules were tested for qualification. Tests involved the following: (1) delivery of 20 solar cells for use as reference cells; (2) module documentation and inspection plans specifying the 10 Group I modules; (3) design review of module documentation from Group I modules; (4) revise module documentation to overcome any problems of deficiencies associated with the Group I modules; (5) delivery of 10 Group II modules built to revised specifications; (6) testing of Group II modules to the criteria as outlined in qualification specification. It is found that the solarvolt MSP43E40B satisfies the design criteria of qualification specification for intermediate load modules. Design changes were made in the Group I modules to overcome the deficiencies which allowed Group II modules to pass the qualification tests.
DOE Office of Scientific and Technical Information (OSTI.GOV)
DUNCAN JB; GUTHRIE MD
2008-08-29
This report documents the laboratory results of RPP-PLAN-35958, Test Plan for the Effluent Treatment Facility to Reduce Chrome (VI) to Chrome (III) in the Secondary Waste Stream With the exception of the electrochemical corrosion scans, all work was carried out at the Center for Laboratory Science (CLS) located at the Columbia Basin College. This document summarizes the work carried out at CLS and includes the electrochemical scans and associated corrosion rates for 304 and 316L stainless steel.
Wave Energy Prize - 1/50th Testing - M3 Wave
Wesley Scharmen
2016-01-08
This submission of data includes all the 1/50th scale testing data completed on the Wave Energy Prize for the M3 Wave team, and includes: 1/50th test data (raw & processed) 1/50th test data video and pictures 1/50th Test plans and testing documents SSTF_Submission (summarized results)
Wave Energy Prize - 1/50th Testing - RTI Wave Power
Wesley Scharmen
2015-12-18
This submission of data includes all the 1/50th scale testing data completed on the Wave Energy Prize for the RTI Wave Power team, and includes: 1/50th test data (raw & processed) 1/50th test data video and pictures 1/50th Test plans and testing documents SSTF_Submission (summarized results)
Wave Energy Prize - 1/50th Testing - Atlas Ocean Systems
Wesley Scharmen
2015-12-04
This submission of data includes all the 1/50th scale testing data completed on the Wave Energy Prize for the Atlas Ocean Systems team, and includes: 1/50th test data (raw & processed) 1/50th test data video and pictures 1/50th Test plans and testing documents SSTF_Submission (summarized results)
Draft Plan to Develop Non-Intrusive Load Monitoring Test Protocols
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mayhorn, Ebony T.; Sullivan, Greg P.; Petersen, Joseph M.
2015-09-29
This document presents a Draft Plan proposed to develop a common test protocol that can be used to evaluate the performance requirements of Non-Intrusive Load Monitoring. Development on the test protocol will be focused on providing a consistent method that can be used to quantify and compare the performance characteristics of NILM products. Elements of the protocols include specifications for appliances to be used, metrics, instrumentation, and a procedure to simulate appliance behavior during tests. In addition, three priority use cases for NILM will be identified and their performance requirements will specified.
NASA Technical Reports Server (NTRS)
1979-01-01
This document addresses requirements for post-test data reduction in support of the Orbital Flight Tests (OFT) mission evaluation team, specifically those which are planned to be implemented in the ODRC (Orbiter Data Reduction Complex). Only those requirements which have been previously baselined by the Data Systems and Analysis Directorate configuration control board are included. This document serves as the control document between Institutional Data Systems Division and the Integration Division for OFT mission evaluation data processing requirements, and shall be the basis for detailed design of ODRC data processing systems.
Balancing Plan-Driven and Agile Methods in Software Engineering Project Courses
NASA Astrophysics Data System (ADS)
Boehm, Barry; Port, Dan; Winsor Brown, A.
2002-09-01
For the past 6 years, we have been teaching a two-semester software engineering project course. The students organize into 5-person teams and develop largely web-based electronic services projects for real USC campus clients. We have been using and evolving a method called Model- Based (System) Architecting and Software Engineering (MBASE) for use in both the course and in industrial applications. The MBASE Guidelines include a lot of documents. We teach risk-driven documentation: if it is risky to document something, and not risky to leave it out (e.g., GUI screen placements), leave it out. Even so, students tend to associate more documentation with higher grades, although our grading eventually discourages this. We are always on the lookout for ways to have students learn best practices without having to produce excessive documentation. Thus, we were very interested in analyzing the various emerging agile methods. We found that agile methods and milestone plan-driven methods are part of a “how much planning is enough?” spectrum. Both agile and plan-driven methods have home grounds of project characteristics where they clearly work best, and where the other will have difficulties. Hybrid agile/plan-driven approaches are feasible, and necessary for projects having a mix of agile and plan-driven home ground characteristics. Information technology trends are going more toward the agile methods' home ground characteristics of emergent requirements and rapid change, although there is a concurrent increase in concern with dependability. As a result, we are currently experimenting with risk-driven combinations of MBASE and agile methods, such as integrating requirements, test plans, peer reviews, and pair programming into “agile quality management.”
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
In the Bear Creek Valley Watershed Remedial Investigation, the Boneyard/Burnyard was identified as the source of the largest releases of uranium into groundwater and surface water in Bear Creek Valley. The proposed action for remediation of this site is selective excavation and removal of source material and capping of the remainder of the site. The schedule for this action has been accelerated so that this is the first remedial action planned to be implemented in the Bear Creek Valley Record of Decision. Additional data needs to support design of the remedial action were identified at a data quality objectives meetingmore » held for this project. Sampling at the Boneyard/Burnyard will be conducted through the use of a phased approach. Initial or primary samples will be used to make in-the-field decisions about where to locate follow-up or secondary samples. On the basis of the results of surface water, soil, and groundwater analysis, up to six test pits will be dug. The test pits will be used to provide detailed descriptions of source materials and bulk samples. This document sets forth the requirements and procedures to protect the personnel involved in this project. This document also contains the health and safety plan, quality assurance project plan, waste management plan, data management plan, implementation plan, and best management practices plan for this project as appendices.« less
Research and technology goals and objectives for Integrated Vehicle Health Management (IVHM)
NASA Technical Reports Server (NTRS)
1992-01-01
Integrated Vehicle Health Management (IVHM) is defined herein as the capability to efficiently perform checkout, testing, and monitoring of space transportation vehicles, subsystems, and components before, during, and after operational This includes the ability to perform timely status determination, diagnostics, and prognostics. IVHM must support fault-tolerant response including system/subsystem reconfiguration to prevent catastrophic failures; and IVHM must support the planning and scheduling of post-operational maintenance. The purpose of this document is to establish the rationale for IVHM and IVHM research and technology planning, and to develop technical goals and objectives. This document is prepared to provide a broad overview of IVHM for technology and advanced development activities and, more specifically, to provide a planning reference from an avionics viewpoint under the OAST Transportation Technology Program Strategic Plan.
National Center for Combating Terrorism Strategic Plan, September 2003
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bechtel Nevada
2003-09-01
National Center for Combating Terrorism Strategic Plan is to document the mission, vision, and goals for success; define the build plan; and describe initiatives that support the U.S. Department of Homeland Security, U.S. Department of Defense, U.S. Department of Energy, U.S. Department of Justice, intelligence community, National Governors Association, and other organizations or departments with combating terrorism training, testing, and technology responsibilities.
National remote computational flight research facility
NASA Technical Reports Server (NTRS)
Rediess, Herman A.
1989-01-01
The extension of the NASA Ames-Dryden remotely augmented vehicle (RAV) facility to accommodate flight testing of a hypersonic aircraft utilizing the continental United States as a test range is investigated. The development and demonstration of an automated flight test management system (ATMS) that uses expert system technology for flight test planning, scheduling, and execution is documented.
Proposed methods for testing and selecting the ERCC external RNA controls
2005-01-01
The External RNA Control Consortium (ERCC) is an ad-hoc group with approximately 70 members from private, public, and academic organizations. The group is developing a set of external RNA control transcripts that can be used to assess technical performance in gene expression assays. The ERCC is now initiating the Testing Phase of the project, during which candidate external RNA controls will be evaluated in both microarray and QRT-PCR gene expression platforms. This document describes the proposed experiments and informatics process that will be followed to test and qualify individual controls. The ERCC is distributing this description of the proposed testing process in an effort to gain consensus and to encourage feedback from the scientific community. On October 4–5, 2005, the ERCC met to further review the document, clarify ambiguities, and plan next steps. A summary of this meeting and changes to the test plan are provided as an appendix to this manuscript. PMID:16266432
The EPA's ETV Program, in partnership with recognized testing organizations, objectively and systematically documents the performance of commercial ready technologies. Together, with the full participation of the technology developer, develop plans, conduct tests, collect and ana...
GENERIC VERIFICATION PROTOCOL FOR AQUEOUS CLEANER RECYCLING TECHNOLOGIES
This generic verification protocol has been structured based on a format developed for ETV-MF projects. This document describes the intended approach and explain plans for testing with respect to areas such as test methodology, procedures, parameters, and instrumentation. Also ...
Strategic plan for the FleetForward evaluation : technical memorandum
DOT National Transportation Integrated Search
1999-04-01
This document is the final report for the evaluation of the I-95 Corridor Coalitions FleetForward operational test. The objective of this test was to evaluate the usefulness of traffic flow data to motor carrier operations. Cambridge Systematics, in ...
NASA Technical Reports Server (NTRS)
Kennedy, Carolyn D.
2007-01-01
This document is an environmental assessment that examines the environmental impacts of a proposed plan to clear land and to construct a test stand for use in testing the J-2X rocket engine at simulated altitude conditions in support of NASA's Constellation Program.
40 CFR 63.1207 - What are the performance testing requirements?
Code of Federal Regulations, 2010 CFR
2010-07-01
... operating conditions that are most likely to reflect daily maximum operating variability, similar to a... operating variability, similar to a dioxin/furan compliance test; (B) You have not changed the design or... document the temperature location measurement in the comprehensive performance test plan, as required by...
Development Activities on Airbreathing Combined Cycle Engines
NASA Technical Reports Server (NTRS)
McArthur, J. Craig; Lyles, Garry (Technical Monitor)
2000-01-01
Contents include the following: Advanced reusable transportation(ART); aerojet and rocketdyne tests, RBCC focused concept flowpaths,fabricate flight weigh, test select components, document ART project, Istar (Integrated system test of an airbreathing rocket); combined cycle propulsion testbed;hydrocarbon demonstrator tracebility; Istar engine system and vehicle system closure study; and Istar project planning.
Project W-314 specific test and evaluation plan for AZ tank farm upgrades
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hays, W.H.
1998-08-12
The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made by the addition of the SN-631 transfer line from the AZ-O1A pit to the AZ-02A pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system`s performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation P1 an (TEP). Testing includes Validations and Verifications (e.g., Commercial Grade Item Dedication activities, etc), Factory Tests and Inspections (FTIs), installation tests andmore » inspections, Construction Tests and Inspections (CTIs), Acceptance Test Procedures (ATPs), Pre-Operational Test Procedures (POTPs), and Operational Test Procedures (OTPs). The STEP will be utilized in conjunction with the TEP for verification and validation.« less
14 CFR 77.2 - Definition of terms.
Code of Federal Regulations, 2010 CFR
2010-01-01
... planning document or military service military airport planning document. Precision instrument runway means... military airport layout plan; any other FAA planning document, or military service military airport planning document. Utility runway means a runway that is constructed for and intended to be used by...
Reed, Jennifer L.; Munafo, Jennifer Knopf; Ekstrand, Rachel; Gillespie, Gordon; Holland, Carolyn; Britto, Maria T.
2012-01-01
BACKGROUND AND OBJECTIVE: Inadequate follow-up of positive sexually transmitted infection (STI) test results is a gap in health care quality that contributes to the epidemic of STIs in adolescent women. The goal of this study was to improve our ability to contact adolescent women with positive STI test results after an emergency department visit. METHODS: We conducted an interventional quality improvement project at a pediatric emergency department. Phase 1 included plan-do-study-act cycles to test interventions such as provider education and system changes. Phase 2 was a planned experiment studying 2 interventions (study cell phone and patient activation card), using a 2 × 2 factorial design with 1 background variable and 2 replications. Outcomes were: (1) the proportion of women aged 14 to 21 years with STI testing whose confidential telephone number was documented in the electronic medical record; (2) the proportion of STI positive women successfully contacted within 7 days. RESULTS: Phase 1 interventions increased the proportion of records with a confidential number from 24% to 58% and the proportion contacted from 45% to 65%, and decreased loss to follow-up from 40% to 24%. In phase 2, the proportion contacted decreased after the electronic medical record system changed and recording of the confidential number decreased. Study interventions (patient activation card and study cell phone) had a synergistic effect on successful contact, especially when confidential numbers were less reliably documented. CONCLUSIONS: Feasible and sustainable interventions such as improved documentation of a confidential number worked synergistically to increase our ability to successfully contact adolescent women with their STI test results. PMID:22753557
Kauai Test Facility hazards assessment document
DOE Office of Scientific and Technical Information (OSTI.GOV)
Swihart, A
1995-05-01
The Department of Energy Order 55003A requires facility-specific hazards assessment be prepared, maintained, and used for emergency planning purposes. This hazards assessment document describes the chemical and radiological hazards associated with the Kauai Test Facility, Barking Sands, Kauai, Hawaii. The Kauai Test Facility`s chemical and radiological inventories were screened according to potential airborne impact to onsite and offsite individuals. The air dispersion model, ALOHA, estimated pollutant concentrations downwind from the source of a release, taking into consideration the toxicological and physical characteristics of the release site, the atmospheric conditions, and the circumstances of the release. The greatest distance to themore » Early Severe Health Effects threshold is 4.2 kilometers. The highest emergency classification is a General Emergency at the {open_quotes}Main Complex{close_quotes} and a Site Area Emergency at the Kokole Point Launch Site. The Emergency Planning Zone for the {open_quotes}Main Complex{close_quotes} is 5 kilometers. The Emergency Planning Zone for the Kokole Point Launch Site is the Pacific Missile Range Facility`s site boundary.« less
Wave Energy Prize - 1/50th Testing - Advanced Ocean Energy @ VT
Wesley Scharmen
2016-01-29
This submission of data includes all the 1/50th scale testing data completed on the Wave Energy Prize for the for the Advanced Ocean Energy @VT team, and includes: 1/50th test data (raw & processed) 1/50th test data video and pictures 1/50th Test plans and testing documents SSTF_Submission (summarized results)
Wave Energy Prize - 1/50th Testing - Super Watt Wave Catcher Barge Team
Wesley Scharmen
2015-12-04
This submission of data includes all the 1/50th scale testing data completed on the Wave Energy Prize for the Super Watt Wave Catcher Barge team, and includes: 1/50th test data (raw & processed) 1/50th test data video and pictures 1/50th Test plans and testing documents SSTF_Submission (summarized results)
ERIC Educational Resources Information Center
United Nations Educational, Scientific, and Cultural Organization, Paris (France).
A summary of educational planning methodologies tested in Argentina, Guatemala, Brazil, Ecuador, and Bolivia, the document offers opinions and proposals about integrated rural development. Integrated rural development is seen as a social, economic, political, and cultural process in rural areas, designed to improve living conditions. Chapters…
Manpower Planning Criteria Manual, Construction Grants Section.
ERIC Educational Resources Information Center
Texas State Dept. of Water Resources, Austin.
This document presents the material developed in conjunction with a project directed to test a methodology that a state water pollution control agency can use in determining its manpower and training needs. Included is a compilation of the manpower planning criteria used to relate numbers and types of personnel with deferred workloads. It also…
ERIC Educational Resources Information Center
Freeman, Rhonda
Although research documents the adverse effects of parental divorce on children, there is little information on clinical intervention for this population. To empirically test the effectiveness and relative contribution of differing treatments, a program of planned, brief (6 weeks) intervention, aimed at altering children's negative attitudes or…
Action Planning and Recording Achievement.
ERIC Educational Resources Information Center
Green, Muriel
This document examines strategies and procedures that British further education (FE) colleges can use to develop and enhance systems and structures for guiding and supporting learners and learning. It is based on the findings of a field test of the Managing Learning model for planning and recording the process of FE students. First, the importance…
Acadia National Park ITS field operational test : key informant interviews
DOT National Transportation Integrated Search
2003-03-01
This document reflects the ideas and opinions of a group of key informants and stakeholders involved in the Field Operational Test of ITS components in and around Acadia National Park from 1999 through 2002. The stakeholders were involved in the plan...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Warkentin, H; Bubric, K; Giovannetti, H
2016-06-15
Purpose: As a quality improvement measure, we undertook this work to incorporate usability testing into the implementation procedures for new electronic documents and forms used by four affiliated radiation therapy centers. Methods: A human factors specialist provided training in usability testing for a team of medical physicists, radiation therapists, and radiation oncologists from four radiotherapy centers. A usability testing plan was then developed that included controlled scenarios and standardized forms for qualitative and quantitative feedback from participants, including patients. Usability tests were performed by end users using the same hardware and viewing conditions that are found in the clinical environment.more » A pilot test of a form used during radiotherapy CT simulation was performed in a single department; feedback informed adaptive improvements to the electronic form, hardware requirements, resource accessibility and the usability testing plan. Following refinements to the testing plan, usability testing was performed at three affiliated cancer centers with different vault layouts and hardware. Results: Feedback from the testing resulted in the detection of 6 critical errors (omissions and inability to complete task without assistance), 6 non-critical errors (recoverable), and multiple suggestions for improvement. Usability problems with room layout were detected at one center and problems with hardware were detected at one center. Upon amalgamation and summary of the results, three key recommendations were presented to the document’s authors for incorporation into the electronic form. Documented inefficiencies and patient safety concerns related to the room layout and hardware were presented to administration along with a request for funding to purchase upgraded hardware and accessories to allow a more efficient workflow within the simulator vault. Conclusion: By including usability testing as part of the process when introducing any new document or procedure into clinical use, associated risks can be identified and mitigated before patient care and clinical workflow are impacted.« less
Designing the Horizons of Your Small Business.
ERIC Educational Resources Information Center
Helgemo, Robert R.
This manual outlines the planning process for developing a feasibility study for a small business. The material is composed of three parts: the planning documents filled out for an imaginary campground; a business plan summarized from the planning documents; and blank planning documents with introductions and instructions. The documents can be…
Site scientific mission plan for the Southern Great Plains CART site, January-June 1995
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schneider, J.M.; Lamb, P.J.; Sisterson, D.L.
1994-12-01
The Southern Great Plains (SGP) Cloud and Radiation Testbed (CART) site is designed to help satisfy the data needs of the Atmospheric Measurement (ARM) Program Science Team. This document defines the scientific priorities for site activities during the six months beginning on January 1, 1995, and also looks forward in lesser detail to subsequent six-month periods. The primary purpose of this Site Scientific Mission Plan is to provide guidance for the development of plans for site operations. It also provides information on current plans to the ARM functional teams (Management Team, Experiment Support Team [EST], Operations Team, Data Management Teammore » [DMT], Instrument Team [IT], and Campaign Team) and serves to disseminate the plans more generally within the ARM Program and among the members of the Science Team. This document includes a description of the operational status of the site and the primary envisaged site activities, together with information concerning approved and proposed Intensive Observation Periods (IOPs). Amendments will be prepared and distributed whenever the content changes by more than 30% within a six-month period. The primary users of this document are the site operator, the site scientist, the Science Team through the ARM Program Science Director, The ARM Program Experiment Center, and the aforementioned ARM Program functional teams. This plan is a living document that will be updated and reissued every six months as the observational facilities are developed, tested, and augmented and as priorities are adjusted in response to developments in scientific planning and understanding.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-27
... DEPARTMENT OF HOMELAND SECURITY U.S. Customs and Border Protection Announcement of Test Concerning... announces U.S. Customs and Border Protection's (CBP's) plan to conduct a test concerning the manifesting and... test announced in this document begins. In HQ Ruling H026715, CBP held that in order to ensure the...
NASA Technical Reports Server (NTRS)
Ortega, R.; Price, J. M.; Fox, D.
2000-01-01
This technical memorandum documents the results of the research to develop a concept for assessing the structural integrity of impacted composite structures using the strength degradation factor in conjunction with available finite element tools. For this purpose, a literature search was conducted, a plan for conducting impact testing on two laminates was developed, and a finite element model of the impact process was created. Specimens for the impact testing were fabricated to support the impact testing plan.
The Technical Work Plan Tracking Tool
NASA Technical Reports Server (NTRS)
Chullen, Cinda; Leighton, Adele; Weller, Richard A.; Woodfill, Jared; Parkman, William E.; Ellis, Glenn L.; Wilson, Marilyn M.
2003-01-01
The Technical Work Plan Tracking Tool is a web-based application that enables interactive communication and approval of contract requirements that pertain to the administration of the Science, Engineering, Analysis, and Test (SEAT) contract at Johnson Space Center. The implementation of the application has (1) shortened the Technical Work Plan approval process, (2) facilitated writing and documenting requirements in a performance-based environment with associated surveillance plans, (3) simplified the contractor s estimate of the cost for the required work, and (4) allowed for the contractor to document how they plan to accomplish the work. The application is accessible to over 300 designated NASA and contractor employees via two Web sites. For each employee, the application regulates access according to the employee s authority to enter, view, and/or print out diverse information, including reports, work plans, purchase orders, and financial data. Advanced features of this application include on-line approval capability, automatic e-mail notifications requesting review by subsequent approvers, and security inside and outside the firewall.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Harrison, Thomas J.; Howard, Richard H.; Rader, Jordan D.
This document is a notional technology implementation plan (TIP) for the development, testing, and qualification of a prototypic fuel element to support design and construction of a nuclear thermal propulsion (NTP) engine, specifically its pre-flight ground test. This TIP outlines a generic methodology for the progression from non-nuclear out-of-pile (OOP) testing through nuclear in-pile (IP) testing, at operational temperatures, flows, and specific powers, of an NTP fuel element in an existing test reactor. Subsequent post-irradiation examination (PIE) will occur in existing radiological facilities. Further, the methodology is intended to be nonspecific with respect to fuel types and irradiation or examinationmore » facilities. The goals of OOP and IP testing are to provide confidence in the operational performance of fuel system concepts and provide data to program leadership for system optimization and fuel down-selection. The test methodology, parameters, collected data, and analytical results from OOP, IP, and PIE will be documented for reference by the NTP operator and the appropriate regulatory and oversight authorities. Final full-scale integrated testing would be performed separately by the reactor operator as part of the preflight ground test.« less
Online Learning Flight Control for Intelligent Flight Control Systems (IFCS)
NASA Technical Reports Server (NTRS)
Niewoehner, Kevin R.; Carter, John (Technical Monitor)
2001-01-01
The research accomplishments for the cooperative agreement 'Online Learning Flight Control for Intelligent Flight Control Systems (IFCS)' include the following: (1) previous IFC program data collection and analysis; (2) IFC program support site (configured IFC systems support network, configured Tornado/VxWorks OS development system, made Configuration and Documentation Management Systems Internet accessible); (3) Airborne Research Test Systems (ARTS) II Hardware (developed hardware requirements specification, developing environmental testing requirements, hardware design, and hardware design development); (4) ARTS II software development laboratory unit (procurement of lab style hardware, configured lab style hardware, and designed interface module equivalent to ARTS II faceplate); (5) program support documentation (developed software development plan, configuration management plan, and software verification and validation plan); (6) LWR algorithm analysis (performed timing and profiling on algorithm); (7) pre-trained neural network analysis; (8) Dynamic Cell Structures (DCS) Neural Network Analysis (performing timing and profiling on algorithm); and (9) conducted technical interchange and quarterly meetings to define IFC research goals.
14 CFR 1215.115 - Payment and billing.
Code of Federal Regulations, 2010 CFR
2010-01-01
... of all standard pre-launch services such as mission planning, documentation, link analysis, testing, computer, human resources, etc., with the exception of TDRSS operational services, will be paid to the...
14 CFR 21.137 - Quality system.
Code of Federal Regulations, 2012 CFR
2012-01-01
... procedures must include the following, as applicable: (1) A flight test of each aircraft produced unless that... planning, conducting, and documenting internal audits to ensure compliance with the approved quality system...
14 CFR 21.137 - Quality system.
Code of Federal Regulations, 2014 CFR
2014-01-01
... procedures must include the following, as applicable: (1) A flight test of each aircraft produced unless that... planning, conducting, and documenting internal audits to ensure compliance with the approved quality system...
14 CFR 21.137 - Quality system.
Code of Federal Regulations, 2013 CFR
2013-01-01
... procedures must include the following, as applicable: (1) A flight test of each aircraft produced unless that... planning, conducting, and documenting internal audits to ensure compliance with the approved quality system...
A Collaborative Web-Based Approach to Planning Research, Integration, and Testing Using a Wiki
NASA Technical Reports Server (NTRS)
Delaney, Michael M.; Koshimoto, Edwin T.; Noble, Deleena; Duggan, Christopher
2010-01-01
The National Aeronautics and Space Administration Integrated Vehicle Health Management program touches on many different research areas while striving to enable the automated detection, diagnosis, prognosis, and mitigation of adverse events at the aircraft and system level. At the system level, the research focus is on the evaluation of multidisciplinary integrated methods, tools, and technologies for achieving the program goal. The participating program members form a diverse group of government, industry, and academic researchers. The program team developed the Research and Test Integration Plan in order to track significant test and evaluation activities, which are important for understanding, demonstrating, and communicating the overall project state and project direction. The Plan is a living document, which allows the project team the flexibility to construct conceptual test scenarios and to track project resources. The Plan also incorporates several desirable feature requirements for Plan users and maintainers. A wiki has proven to be the most efficient and effective means of implementing the feature requirements for the Plan. The wiki has proven very valuable as a research project management tool, and there are plans to expand its scope.
IN SITU FIELD TESTING OF PROCESSES
DOE Office of Scientific and Technical Information (OSTI.GOV)
J.S.Y. YANG
2004-11-08
The purpose of this scientific analysis report is to update and document the data and subsequent analyses from ambient field-testing activities performed in underground drifts and surface-based boreholes through unsaturated zone (UZ) tuff rock units. In situ testing, monitoring, and associated laboratory studies are conducted to directly assess and evaluate the waste emplacement environment and the natural barriers to radionuclide transport at Yucca Mountain. This scientific analysis report supports and provides data to UZ flow and transport model reports, which in turn contribute to the Total System Performance Assessment (TSPA) of Yucca Mountain, an important document for the license applicationmore » (LA). The objectives of ambient field-testing activities are described in Section 1.1. This report is the third revision (REV 03), which supercedes REV 02. The scientific analysis of data for inputs to model calibration and validation as documented in REV 02 were developed in accordance with the Technical Work Plan (TWP) ''Technical Work Plan for: Performance Assessment Unsaturated Zone'' (BSC 2004 [DIRS 167969]). This revision was developed in accordance with the ''Technical Work Plan for: Unsaturated Zone Flow Analysis and Model Report Integration'' (BSC 2004 [DIRS 169654], Section 1.2.4) for better integrated, consistent, transparent, traceable, and more complete documentation in this scientific analysis report and associated UZ flow and transport model reports. No additional testing or analyses were performed as part of this revision. The list of relevant acceptance criteria is provided by ''Technical Work Plan for: Unsaturated Zone Flow Analysis and Model Report Integration'' (BSC 2004 [DIRS 169654]), Table 3-1. Additional deviations from the TWP regarding the features, events, and processes (FEPs) list are discussed in Section 1.3. Documentation in this report includes descriptions of how, and under what conditions, the tests were conducted. The descriptions and analyses provide data useful for refining and confirming the understanding of flow, drift seepage, and transport processes in the UZ. The UZ testing activities included measurement of permeability distribution, quantification of the seepage of water into the drifts, evaluation of fracture-matrix interaction, study of flow along faults, testing of flow and transport between drifts, characterization of hydrologic heterogeneity along drifts, estimation of drying effects on the rock surrounding the drifts due to ventilation, monitoring of moisture conditions in open and sealed drifts, and determination of the degree of minimum construction water migration below drift. These field tests were conducted in two underground drifts at Yucca Mountain, the Exploratory Studies Facility (ESF) drift, and the cross-drift for Enhanced Characterization of the Repository Block (ECRB), as described in Section 1.2. Samples collected in boreholes and underground drifts have been used for additional hydrochemical and isotopic analyses for additional understanding of the UZ setting. The UZ transport tests conducted at the nearby Busted Butte site (see Figure 1-4) are also described in this scientific analysis report.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chen, K.; Tsai, H.; Decision and Information Sciences
The technical basis for extending the Model 9977 shipping package periodic maintenance beyond the one-year interval to a maximum of five years is based on the performance of the O-ring seals and the environmental conditions. The DOE Packaging Certification Program (PCP) has tasked Argonne National Laboratory to develop a Radio-Frequency Identification (RFID) temperature monitoring system for use by the facility personnel at DAF/NTS. The RFID temperature monitoring system, depicted in the figure below, consists of the Mk-1 RFId tags, a reader, and a control computer mounted on a mobile platform that can operate as a stand-alone system, or it canmore » be connected to the local IT network. As part of the Conditions of Approval of the CoC, the user must complete the prescribed training to become qualified and be certified for operation of the RFID temperature monitoring system. The training course will be administered by Argonne National Laboratory on behalf of the Headquarters Certifying Official. This is a complete documentation package for the RFID temperature monitoring system of the Model 9977 packagings at NTS. The documentation package will be used for training and certification. The table of contents are: Acceptance Testing Procedure of MK-1 RFID Tags for DOE/EM Nuclear Materials Management Applications; Acceptance Testing Result of MK-1 RFID Tags for DOE/EM Nuclear Materials Management Applications; Performance Test of the Single Bolt Seal Sensor for the Model 9977 Packaging; Calibration of Built-in Thermistors in RFID Tags for Nevada Test Site; Results of Calibration of Built-in Thermistors in RFID Tags; Results of Thermal Calibration of Second Batch of MK-I RFID Tags; Procedure for Installing and Removing MK-1 RFID Tag on Model 9977 Drum; User Guide for RFID Reader and Software for Temperature Monitoring of Model 9977 Drums at NTS; Software Quality Assurance Plan (SQAP) for the ARG-US System; Quality Category for the RFID Temperature Monitoring System; The Documentation Package for the RFID Temperature Monitoring System; Software Test Plan and Results for ARG-US OnSite; Configuration Management Plan (CMP) for the ARG-US System; Requirements Management Plan for the ARG-US System; and Design Management Plan for ARG-US.« less
Trends in liability affecting technical writers
NASA Technical Reports Server (NTRS)
Driskill, L. P.
1981-01-01
Liability of technical writers for defective products is explored. Documents generated during a product's life cycle (including design memos, design tests, clinical trials, trial use reports, letters, and proposals) become relevant because they are likely to become the only available means of showing that the product was not defectively designed. These documents become the evidence that the product underwent balanced and well considered planning, development, testing, quality control, and field testing. The predicted increased involvement of technical writers in the prevention and defense of product liability claims is cited in view of a greater number of cases turning on "failure to warn".
NASA Construction of Facilities Validation Processes - Total Building Commissioning (TBCx)
NASA Technical Reports Server (NTRS)
Hoover, Jay C.
2004-01-01
Key Atributes include: Total Quality Management (TQM) System that looks at all phases of a project. A team process that spans boundaries. A Commissioning Authority to lead the process. Commissioning requirements in contracts. Independent design review to verify compliance with Facility Project Requirements (FPR). Formal written Commissioning Plan with Documented Results. Functional performance testing (FPT) against the requirements document.
Introduction and development of NCP using ICNP in Pakistan.
Rukanuddin, R J
2005-12-01
Traditionally, nursing care has been described as performing nursing tasks and often focused on nurses carrying out doctors' orders. In many countries of the world, including Pakistan, nurses do not document care in a standardized manner. Because of this limitation many health administrators, policy makers, and consumers make inadequate assumptions about nursing work, often regarding nurses as any other 'health care technician' who can be easily replaced by more economical health care workers. To overcome this problem, standardized documentation is being introduced into the Aga Khan University School of Nursing and hospital, Aga Khan Health Services, Public Health School in Karachi, and government colleges of nursing, using the International Classification for Nursing Practice (ICNP). The purpose of this paper is to highlight the process of introducing and developing standardized nursing care plans (NCP) using ICNP in Pakistan. The process for introducing ICNP consists of four components, including administrative planning, development, teaching and training, and testing. Subsets of the ICNP for (i) maternity: antenatal, postnatal and natal care; and (ii) cardiology were developed using standardized NCPs. The subsets were developed by nurse experts and introduced at the testing sites. The testing will be conducted as a pilot project. Findings from the pilot will be used to continue and expand standardized nursing documentation using the ICNP across Pakistan. Through this project, nurses, midwives and lady health visitors (midwives, vaccinator and health educators) will test standardization of documentation and begin to evaluate efficiency and effectiveness of clinical practice.
The Development of a Tactical Dual-Wavelength Nephelometer.
1982-11-24
Instrument Layout 50 4.5 Optical Systems 53 4.6 Electronic Systems 56 4.6.1 Transmitter System 56 4.6.2 Receiver Systems 58 5. R&D TEST AND ACCEPTANCE PLAN 61... PLAN , 136 HSS-B-086, 10 DEC1981. APPENDIX B ARVIN CALSPAN DOCUMENTATION OF 155 EXTINCTION AND PARTICLE SIZE MEASUREMENTS FOR CHAMBER TESTS OF MAY 1982. 6...121 FP’enn Aerosol Models. 8.9 Aerosol Extinction Coefficients at Two Wavelenghts 129 and their Ratio for Four Deirmendjian Aerosol Models. 10
WSTIAC: Weapon Systems Technology Information Analysis Center. Volume 6, Number 1
2005-01-01
official documentation. 2 WS"IAE Newslelter Winter 2005 Lobster Robo [s (Continued from page 1) When compared to terrestrial arthropods, underwater...were partially offset by a net during the S&T phase, could help ease the transition to the decrease of planned quantities to be purchased (-$24.4...environment to archive the ly always involves the use of a Test and Evaluation Master development of an entire system, on paper qnd/or elec- Plan (TEMP). Test
NASA Technical Reports Server (NTRS)
Fay, M.
1998-01-01
This Contamination Control Plan is submitted in response the Contract Document requirements List (CDRL) 007 under contract NAS5-32314 for the Earth Observing System (EOS) Advanced Microwave Sounding Unit A (AMSU-A). In response to the CDRL instructions, this document defines the level of cleanliness and methods/procedures to be followed to achieve adequate cleanliness/contamination control, and defines the required approach to maintain cleanliness/contamination control through shipping, observatory integration, test, and flight. This plan is also applicable to the Meteorological Satellite (METSAT) except where requirements are identified as EOS-specific. This plan is based on two key factors: a. The EOS/METSAT AMSU-A Instruments are not highly contamination sensitive. b. Potential contamination of other EOS Instruments is a key concern as addressed in Section 9/0 of the Performance Assurance Requirements for EOS/METSAT Integrated Programs AMSU-A Instrument (MR) (NASA Specification S-480-79).
optical, and structural integrity of the full scale ASTEC solar collector before further development proceeds. This document specifies these initial...engineering ground tests recommended for testing petals and other critical components of the ASTEC collector. It defines the requirements and
Intelligent Software for System Design and Documentation
NASA Technical Reports Server (NTRS)
2002-01-01
In an effort to develop a real-time, on-line database system that tracks documentation changes in NASA's propulsion test facilities, engineers at Stennis Space Center teamed with ECT International of Brookfield, WI, through the NASA Dual-Use Development Program to create the External Data Program and Hyperlink Add-on Modules for the promis*e software. Promis*e is ECT's top-of-the-line intelligent software for control system design and documentation. With promis*e the user can make use of the automated design process to quickly generate control system schematics, panel layouts, bills of material, wire lists, terminal plans and more. NASA and its testing contractors currently use promis*e to create the drawings and schematics at the E2 Cell 2 test stand located at Stennis Space Center.
NIF Operations Management Plan, August 2011
DOE Office of Scientific and Technical Information (OSTI.GOV)
Van Wonterghem, Bruno M.
Lawrence Livermore National Laboratory’s (LLNL) National Ignition Facility (NIF) is a key component of the National Nuclear Security Administration’s (NNSA) Stockpile Stewardship Program, whose purpose is to maintain the safety, reliability, and effectiveness of our nation’s nuclear stockpile without underground nuclear testing. The NIF is crucial to the Stockpile Stewardship Program because it is the only facility that can create the conditions of extreme temperature and pressure—conditions that exist only in stars or in exploding nuclear weapons—that are relevant to understanding how our modern nuclear weapons operate. As such, the NIF’s primary mission is to attain fusion ignition in themore » laboratory. Fusion ignition not only supports Stockpile Stewardship needs, but also provides the basis for future decisions about fusion’s potential as a long-term energy source. Additionally, NIF provides scientists with access to high-energy-density regimes that can yield new insight and understanding in the areas of astrophysics, hydrodynamics, material properties, plasma physics, and radiative properties. The use of the NIF to support the Stockpile Stewardship Program and the advancement of basic high-energy-density science understanding is planned and managed through program-level execution plans and NIF directorate-level management teams. An example of a plan is the National Ignition Campaign Execution Plan. The NIF Operations Management Plan provides an overview of the NIF Operations organization and describes how the NIF is supported by the LLNL infrastructure and how it is safely and responsibly managed and operated. Detailed information on NIF management of the organization is found in a series of supporting plans, policies, and procedures. A list of related acronyms can be found in Appendix A of this document. The purpose of this document is to provide a roadmap of how the NIF Operations organization functions. It provides a guide to understanding the requirements, document flow down, organizational vision and mission, performance metrics, and interrelationship of the NIF Operations organization with other directorate and laboratory organizations. This document also provides a listing of roles and responsibilities, core processes, procedures, authority matrices, change control boards, and other information necessary for successfully functioning in the NIF Operations organization. This document, the NIF Shot Operations Plan, and the NIF Maintenance Plan together represent the primary documents satisfying our Conduct of Operations compliance requirement.« less
77 FR 60915 - Revisions to the Nevada State Implementation Plan, Washoe County Air Quality District
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-05
... compliance with permit conditions, recordkeeping, source sampling and testing, and statements of compliance... Demonstration of Compliance. WCDBOH 030.230 Record Keeping. WCDBOH 030.235 Requirements for Source Sampling... Federal Register Sampling and page number Testing''. where the document begins]. * * * * * * * 030.970A...
78 FR 52838 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-27
... Maintenance Planning Data (MPD) Document. Repeat the test thereafter at intervals not to exceed 7,500 flight... by loss of fuel system suction feed capability on one engine, and in-flight shutdown of the engine...-101, before further flight, perform all related testing and corrective actions, and repeat the...
Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
2012-10-24
This plan incorporates U.S. Department of Energy (DOE) Office of Legacy Management (LM) standard operating procedures (SOPs) into environmental monitoring activities and will be implemented at all sites managed by LM. This document provides detailed procedures for the field sampling teams so that samples are collected in a consistent and technically defensible manner. Site-specific plans (e.g., long-term surveillance and maintenance plans, environmental monitoring plans) document background information and establish the basis for sampling and monitoring activities. Information will be included in site-specific tabbed sections to this plan, which identify sample locations, sample frequencies, types of samples, field measurements, and associatedmore » analytes for each site. Additionally, within each tabbed section, program directives will be included, when developed, to establish additional site-specific requirements to modify or clarify requirements in this plan as they apply to the corresponding site. A flowchart detailing project tasks required to accomplish routine sampling is displayed in Figure 1. LM environmental procedures are contained in the Environmental Procedures Catalog (LMS/PRO/S04325), which incorporates American Society for Testing and Materials (ASTM), DOE, and U.S. Environmental Protection Agency (EPA) guidance. Specific procedures used for groundwater and surface water monitoring are included in Appendix A. If other environmental media are monitored, SOPs used for air, soil/sediment, and biota monitoring can be found in the site-specific tabbed sections in Appendix D or in site-specific documents. The procedures in the Environmental Procedures Catalog are intended as general guidance and require additional detail from planning documents in order to be complete; the following sections fulfill that function and specify additional procedural requirements to form SOPs. Routine revision of this Sampling and Analysis Plan will be conducted annually at the beginning of each fiscal year when attachments in Appendix D, including program directives and sampling location/analytical tables, will be reviewed by project personnel and updated. The sampling location/analytical tables in Appendix D, however, may have interim updates according to project direction that are not reflected in this plan. Deviations from location/analytical tables in Appendix D prior to sampling will be documented in project correspondence (e.g., startup letters). If significant changes to other aspects of this plan are required before the annual update, then the plan will be revised as needed.« less
14 CFR 21.165 - Responsibility of holder.
Code of Federal Regulations, 2011 CFR
2011-01-01
... following, as applicable: (1) A flight test of each aircraft produced unless that aircraft will be exported... § 45.15(c) of this chapter. (l) Internal audits. Procedures for planning, conducting, and documenting...
Project W-314 specific test and evaluation plan for transfer line SN-633 (241-AX-B to 241-AY-02A)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hays, W.H.
1998-03-20
The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made by the addition of the SN-633 transfer line by the W-314 Project. The STEP develops the outline for test procedures that verify the system`s performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP). This STEP encompasses all testing activities required to demonstrate compliance to the project design criteria as it relates to the addition of transfer line SN-633. The Project Design Specificationsmore » (PDS) identify the specific testing activities required for the Project. Testing includes Validations and Verifications (e.g., Commercial Grade Item Dedication activities), Factory Acceptance Tests (FATs), installation tests and inspections, Construction Acceptance Tests (CATs), Acceptance Test Procedures (ATPs), Pre-Operational Test Procedures (POTPs), and Operational Test Procedures (OTPs). It should be noted that POTPs are not required for testing of the transfer line addition. The STEP will be utilized in conjunction with the TEP for verification and validation.« less
Transuranic Waste Test Facility Development Program
DOE Office of Scientific and Technical Information (OSTI.GOV)
Looper, M.G.
1987-05-05
This letter discusses the development and test program planned for the Transuranic Waste Test Facility (TWTF). The planned effort is based on previous work in the ADandD Pilot Facility and testing of TWTF equipment before installation. Input from Waste Management and AED Fairview is included. The program will focus on the following areas: Retrieval; Material Handling; Size Reduction; Operation and Maintenance. The program will take 1-1/2 to 2 years to complete and began in December 1986. Technical Data Summaries (TDS) and basic data reports will be issued periodically to document results and provide basic data for the Transuranic Waste Facilitymore » (TWF). 2 refs., 2 figs.« less
NASA Technical Reports Server (NTRS)
Burnett, S. Kay; Forsyth, Theodore J.; Maynard, Everett E.
1987-01-01
The development of a computerized instrumentation test plan (ITP) for the NASA/Ames Research Center National Full Scale Aerodynamics Complex (NFAC) is discussed. The objective of the ITP program was to aid the instrumentation engineer in documenting the configuration and calibration of data acquisition systems for a given test at any of four low speed wind tunnel facilities (Outdoor Aerodynamic Research Facility, 7 x 10, 40 x 80, and 80 x 120) at the NFAC. It is noted that automation of the ITP has decreased errors, engineering hours, and setup time while adding a higher level of consistency and traceability.
1974-08-01
contributed substantially to the planning of the flight course used in this study and in the preparation of this report. Assistance in business matters has...CONTENTS Page INTRODUCTION 1 METHOD 5 Subjects 5 Equipment Experimental Plan 8 Procedure 14 Performance Assessment 17 Statistical Treatment 19 RESULTS...implementation of RNAV service. These documents provide the basis for future RNAV planning both procedurally and quantitatively. At the heart of the
NASA Technical Reports Server (NTRS)
Johnson, Kenneth L.; White, K. Preston, Jr.
2012-01-01
The NASA Engineering and Safety Center was requested to improve on the Best Practices document produced for the NESC assessment, Verification of Probabilistic Requirements for the Constellation Program, by giving a recommended procedure for using acceptance sampling by variables techniques as an alternative to the potentially resource-intensive acceptance sampling by attributes method given in the document. In this paper, the results of empirical tests intended to assess the accuracy of acceptance sampling plan calculators implemented for six variable distributions are presented.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Brown, Geoffrey Wayne
2016-03-16
This document identifies scope and some general procedural steps for performing Remediated Nitrate Salt (RNS) Surrogate Formulation and Testing. This Test Plan describes the requirements, responsibilities, and process for preparing and testing a range of chemical surrogates intended to mimic the energetic response of waste created during processing of legacy nitrate salts. The surrogates developed are expected to bound1 the thermal and mechanical sensitivity of such waste, allowing for the development of process parameters required to minimize the risk to worker and public when processing this waste. Such parameters will be based on the worst-case kinetic parameters as derived frommore » APTAC measurements as well as the development of controls to mitigate sensitivities that may exist due to friction, impact, and spark. This Test Plan will define the scope and technical approach for activities that implement Quality Assurance requirements relevant to formulation and testing.« less
ERIC Educational Resources Information Center
Findorff, Irene K.
This document summarizes the results of a project at Tulane University that was designed to adapt, test, and evaluate a computerized information and menu planning system utilizing linear programing techniques for use in school lunch food service operations. The objectives of the menu planning were to formulate menu items into a palatable,…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-12
... will be executed will be added when Dominion Virginia Power, who is part of the Electric Power research... Electric Power Research Institute (EPRI) to document what is planned to be accomplished by the CDP. DOE is... Storage Cask Research and Development Project (CDP) AGENCY: Fuel Cycle Technologies, Office of Nuclear...
Upgrades, Current Capabilities and Near-Term Plans of the NASA ARC Mars Climate
NASA Technical Reports Server (NTRS)
Hollingsworth, J. L.; Kahre, Melinda April; Haberle, Robert M.; Schaeffer, James R.
2012-01-01
We describe and review recent upgrades to the ARC Mars climate modeling framework, in particular, with regards to physical parameterizations (i.e., testing, implementation, modularization and documentation); the current climate modeling capabilities; selected research topics regarding current/past climates; and then, our near-term plans related to the NASA ARC Mars general circulation modeling (GCM) project.
Kozar, Mark D.; Kahle, Sue C.
2013-01-01
This report documents the standard procedures, policies, and field methods used by the U.S. Geological Survey’s (USGS) Washington Water Science Center staff for activities related to the collection, processing, analysis, storage, and publication of groundwater data. This groundwater quality-assurance plan changes through time to accommodate new methods and requirements developed by the Washington Water Science Center and the USGS Office of Groundwater. The plan is based largely on requirements and guidelines provided by the USGS Office of Groundwater, or the USGS Water Mission Area. Regular updates to this plan represent an integral part of the quality-assurance process. Because numerous policy memoranda have been issued by the Office of Groundwater since the previous groundwater quality assurance plan was written, this report is a substantial revision of the previous report, supplants it, and contains significant additional policies not covered in the previous report. This updated plan includes information related to the organization and responsibilities of USGS Washington Water Science Center staff, training, safety, project proposal development, project review procedures, data collection activities, data processing activities, report review procedures, and archiving of field data and interpretative information pertaining to groundwater flow models, borehole aquifer tests, and aquifer tests. Important updates from the previous groundwater quality assurance plan include: (1) procedures for documenting and archiving of groundwater flow models; (2) revisions to procedures and policies for the creation of sites in the Groundwater Site Inventory database; (3) adoption of new water-level forms to be used within the USGS Washington Water Science Center; (4) procedures for future creation of borehole geophysics, surface geophysics, and aquifer-test archives; and (5) use of the USGS Multi Optional Network Key Entry System software for entry of routine water-level data collected as part of long-term water-level monitoring networks.
Test plan : I-40 TTIS tourist intercept survey
DOT National Transportation Integrated Search
1998-06-01
This document assembles best practices and presents practical advice on how to acquire the software components of Intelligent Transportation Systems (ITS). The intended audience is the "customers" - the project leaders, technical contract managers, d...
The Danish Environmental Technology Verification program (DANETV) Water Test Centre operated by DHI, is supported by the Danish Ministry for Science, Technology and Innovation. DANETV, the United States Environmental Protection Agency Environmental Technology Verification Progra...
Acquisition Handbook - Update. Comprehensive Approach to Reusable Defensive Software (CARDS)
1994-03-25
designs, and implementation components (source code, test plans, procedures and results, and system/software documentation). This handbook provides a...activities where software components are acquired, evaluated, tested and sometimes modified. In addition to serving as a facility for the acquisition and...systems from such components [1]. Implementation components are at the lowest level and consist of: specifications; detailed designs; code, test
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mark Burmeister
2007-09-01
This CR provides documentation and justification for the closure of CAU 118 without further corrective action. This justification is based on process knowledge and the results of the investigative and closure activities conducted in accordance with the CAU 118 SAFER Plan: Streamlined Approach for Environmental Restoration (SAFER) Plan for CAU 118: Area 27 Super Kukla Facility, Nevada Test Site, Nevada (NNSA/NSO, 2006). The SAFER Plan provides information relating to site history as well as the scope and planning of the investigation. This CR also provides the analytical and radiological survey data to confirm that the remediation goals were met asmore » specified in the CAU 118 SAFER Plan (NNSA/NSO, 2006). The Nevada Division of Environmental Protection (NDEP) approved the CAU 118 SAFER Plan (Murphy, 2006), which recommends closure in place with use restrictions (URs).« less
40 CFR 63.7752 - What records must I keep?
Code of Federal Regulations, 2010 CFR
2010-07-01
.... (3) Records of performance tests and performance evaluations as required by § 63.10(b)(2)(viii). (4... cores, the Material Data Safety Sheet or other documentation that provides the chemical composition of... evaluation plan as required in § 63.8(d)(3). (3) Request for alternatives to relative accuracy tests for CEMS...
Flight test and evaluation of Omega navigation in a general aviation aircraft. Volume 2: Appendices
NASA Technical Reports Server (NTRS)
Howell, J. D.; Hoffman, W. C.; Hwoschinsky, P. V.; Wischmeyer, C. E.
1975-01-01
Detailed documentation for each flight of the Omega Flight Evaluation study is presented, including flight test description sheets and actual flight data plots. Computer programs used for data processing and flight planning are explained and the data formats utilized by the Custom Interface Unit are summarized.
20 CFR 668.710 - What planning documents must an INA grantee submit?
Code of Federal Regulations, 2010 CFR
2010-04-01
... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false What planning documents must an INA grantee... Planning/Funding Process § 668.710 What planning documents must an INA grantee submit? Each grantee... participant services and expenditures covering the two-year planning cycle. We will, in consultation with the...
Portable exhauster POR-007/Skid E and POR-008/Skid F storage plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nelson, O.D.
1998-07-25
This document provides storage requirements for 1,000 CFM portable exhausters POR-O07/Skid E and POR-008/Skid F. These requirements are presented in three parts: preparation for storage, storage maintenance and testing, and retrieval from storage. The exhauster component identification numbers listed in this document contain the prefix POR-007 or POR-008 depending on which exhauster is being used.
Study of airborne science experiment management concepts for application to space shuttle, volume 2
NASA Technical Reports Server (NTRS)
Mulholland, D. R.; Reller, J. O., Jr.; Neel, C. B.; Haughney, L. C.
1973-01-01
Airborne research management and shuttle sortie planning at the Ames Research Center are reported. Topics discussed include: basic criteria and procedures for the formulation and approval of airborne missions; ASO management structure and procedures; experiment design, development, and testing aircraft characteristics and experiment interfaces; information handling for airborne science missions; mission documentation requirements; and airborne science methods and shuttle sortie planning.
ERIC Educational Resources Information Center
Mattatuck Community Coll., Waterbury, CT.
This document contains a developmental curriculum plan for an articulated curriculum in automotive mechanics for Connecticut's Mattatuck Community College and area high schools. The curriculum guide includes a course description, criteria for evaluation, attendance policy, objectives, a curriculum outline, a three-part automotive technician test,…
ERIC Educational Resources Information Center
MCKEE, ROBERT L.; RIDLEY, KATHRYN J.
TO ESTABLISH A COLLEGE IN 100 DAYS PRESENTED AN OPPORTUNITY TO TEST THE VALUE OF PROGRAMED ORGANIZATIONAL PROCEDURES USING PROGRAM PERFORMANCE EVALUATION AND REVIEW TECHNIQUE (PERT) UNDER ACTUAL OPERATIONAL CONDITIONS, NOT IN A SIMULATED THEORETICAL SITUATION. THROUGH THE AID OF THE PERT PLANNING SYSTEM, IT WAS DETERMINED THAT THERE WERE NINE…
Toward implementation of a national ground water monitoring network
Schreiber, Robert P.; Cunningham, William L.; Copeland, Rick; Frederick, Kevin D.
2008-01-01
The Federal Advisory Committee on Water Information's (ACWI) Subcommittee on Ground Water (SOGW) has been working steadily to develop and encourage implementation of a nationwide, long-term ground-water quantity and quality monitoring framework. Significant progress includes the planned submission this fall of a draft framework document to the full committee. The document will include recommendations for implementation of the network and continued acknowledgment at the federal and state level of ACWI's potential role in national monitoring toward an improved assessment of the nation's water reserves. The SOGW mission includes addressing several issues regarding network design, as well as developing plans for concept testing, evaluation of costs and benefits, and encouraging the movement from pilot-test results to full-scale implementation within a reasonable time period. With the recent attention to water resource sustainability driven by severe droughts, concerns over global warming effects, and persistent water supply problems, the SOGW mission is now even more critical.
Step 1: C3 Flight Demo Data Analysis Plan
NASA Technical Reports Server (NTRS)
2005-01-01
The Data Analysis Plan (DAP) describes the data analysis that the C3 Work Package (WP) will perform in support of the Access 5 Step 1 C3 flight demonstration objectives as well as the processes that will be used by the Flight IPT to gather and distribute the data collected to satisfy those objectives. In addition to C3 requirements, this document will encompass some Human Systems Interface (HSI) requirements in performing the C3 flight demonstrations. The C3 DAP will be used as the primary interface requirements document between the C3 Work Package and Flight Test organizations (Flight IPT and Non-Access 5 Flight Programs). In addition to providing data requirements for Access 5 flight test (piggyback technology demonstration flights, dedicated C3 technology demonstration flights, and Airspace Operations Demonstration flights), the C3 DAP will be used to request flight data from Non- Access 5 flight programs for C3 related data products
Semantic Metadata for Heterogeneous Spatial Planning Documents
NASA Astrophysics Data System (ADS)
Iwaniak, A.; Kaczmarek, I.; Łukowicz, J.; Strzelecki, M.; Coetzee, S.; Paluszyński, W.
2016-09-01
Spatial planning documents contain information about the principles and rights of land use in different zones of a local authority. They are the basis for administrative decision making in support of sustainable development. In Poland these documents are published on the Web according to a prescribed non-extendable XML schema, designed for optimum presentation to humans in HTML web pages. There is no document standard, and limited functionality exists for adding references to external resources. The text in these documents is discoverable and searchable by general-purpose web search engines, but the semantics of the content cannot be discovered or queried. The spatial information in these documents is geographically referenced but not machine-readable. Major manual efforts are required to integrate such heterogeneous spatial planning documents from various local authorities for analysis, scenario planning and decision support. This article presents results of an implementation using machine-readable semantic metadata to identify relationships among regulations in the text, spatial objects in the drawings and links to external resources. A spatial planning ontology was used to annotate different sections of spatial planning documents with semantic metadata in the Resource Description Framework in Attributes (RDFa). The semantic interpretation of the content, links between document elements and links to external resources were embedded in XHTML pages. An example and use case from the spatial planning domain in Poland is presented to evaluate its efficiency and applicability. The solution enables the automated integration of spatial planning documents from multiple local authorities to assist decision makers with understanding and interpreting spatial planning information. The approach is equally applicable to legal documents from other countries and domains, such as cultural heritage and environmental management.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zhou, Y; Tan, J; Jiang, S
Purpose: Plan specific quality assurance (QA) is an important step in high dose rate (HDR) brachytherapy to ensure the integrity of a treatment plan. The conventional approach is to assemble a set of plan screen-captures in a document and have an independent plan-checker to verify it. Not only is this approach cumbersome and time-consuming, using a document also limits the items that can be verified, hindering plan quality and patient safety. We have initiated efforts to develop a web-based HDR brachytherapy QA system called AutoBrachy QA, for comprehensive and efficient QA. This abstract reports a new plugin in this systemmore » for the QA of a cylinder HDR brachytherapy treatment. Methods: A cylinder plan QA module was developed using Python. It was plugged into our AutoBrachy QA system. This module extracted information from CT images and treatment plan. Image processing techniques were employed to obtain geometric parameters, e.g. cylinder diameter. A comprehensive set of eight geometrical and eight dosimetric features of the plan were validated against user specified planning parameter, such as prescription value, treatment depth and length, etc. A PDF document was generated, consisting of a summary QA sheet with all the QA results, as well as images showing plan details. Results: The cylinder QA program has been implemented in our clinic. To date, it has been used in 11 patient cases and was able to successfully perform QA tests in all of them. The QA program reduced the average plan QA time from 7 min using conventional manual approach to 0.5 min. Conclusion: Being a new module in our AutoBrachy QA system, an automated treatment plan QA module for cylinder HDR brachytherapy has been successfully developed and clinically implemented. This module improved clinical workflow and plan integrity compared to the conventional manual approach.« less
Test, Control and Monitor System (TCMS) operations plan
NASA Technical Reports Server (NTRS)
Macfarlane, C. K.; Conroy, M. P.
1993-01-01
The purpose is to provide a clear understanding of the Test, Control and Monitor System (TCMS) operating environment and to describe the method of operations for TCMS. TCMS is a complex and sophisticated checkout system focused on support of the Space Station Freedom Program (SSFP) and related activities. An understanding of the TCMS operating environment is provided and operational responsibilities are defined. NASA and the Payload Ground Operations Contractor (PGOC) will use it as a guide to manage the operation of the TCMS computer systems and associated networks and workstations. All TCMS operational functions are examined. Other plans and detailed operating procedures relating to an individual operational function are referenced within this plan. This plan augments existing Technical Support Management Directives (TSMD's), Standard Practices, and other management documentation which will be followed where applicable.
20 CFR 669.510 - What planning documents must an NFJP grantee submit?
Code of Federal Regulations, 2014 CFR
2014-04-01
... 20 Employees' Benefits 4 2014-04-01 2014-04-01 false What planning documents must an NFJP grantee submit? 669.510 Section 669.510 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF... Performance Accountability, Planning and Waiver Provision § 669.510 What planning documents must an NFJP...
32 CFR 813.6 - Planning and requesting combat documentation.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Joint Operation Planning and Execution System, that in turn, requests support from HQ AMC. HQ USAF can... 32 National Defense 6 2010-07-01 2010-07-01 false Planning and requesting combat documentation... SALES AND SERVICES VISUAL INFORMATION DOCUMENTATION PROGRAM § 813.6 Planning and requesting combat...
36 CFR 219.14 - Decision document and planning records.
Code of Federal Regulations, 2012 CFR
2012-07-01
... planning records. 219.14 Section 219.14 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF... records. (a) Decision document. The responsible official shall record approval of a new plan, plan... (§ 219.15); (4) The documentation of how the best available scientific information was used to inform...
36 CFR 219.14 - Decision document and planning records.
Code of Federal Regulations, 2014 CFR
2014-07-01
... planning records. 219.14 Section 219.14 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF... records. (a) Decision document. The responsible official shall record approval of a new plan, plan... (§ 219.15); (4) The documentation of how the best available scientific information was used to inform...
VERIFICATION TESTING OF AIR POLLUTION CONTROL TECHNOLOGY QUALITY MANAGEMENT PLAN
This document is the basis for quality assurance for the Air Pollution Control Technology Verification Center (APCT Center) operated under the U.S. Environmental Protection Agency (EPA). It describes the policies, organizational structure, responsibilities, procedures, and qualit...
Use of electronic fare transaction data for corridor planning.
DOT National Transportation Integrated Search
2017-06-01
This report documents the initial phase of a project that developed, tested, and used a methodology and tool set for converting electronic transit agency fare card transaction data, the Puget Sound regions ORCA electronic fare card, into informati...
ERIC Educational Resources Information Center
Kiser, Chester; And Others
This 2-part document is designed to aid school districts in the implementation of a planning programing budgeting system. The first part of the manual contains (1) statements of policy, (2) a master flowchart, (3) organization and functions of a PPBS system, (4) a flowscript of procedures, (5) job outlines, and (6) supplementary appendix material.…
20 CFR 669.510 - What planning documents must an NFJP grantee submit?
Code of Federal Regulations, 2010 CFR
2010-04-01
... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false What planning documents must an NFJP grantee submit? 669.510 Section 669.510 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF... Accountability, Planning and Waiver Provision § 669.510 What planning documents must an NFJP grantee submit? Each...
Test Plan for Cask Identification Detector
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rauch, Eric Benton
2016-09-29
This document serves to outline the testing of a Used Fuel Cask Identification Detector (CID) currently being designed under the DOE-NE MPACT Campaign. A bench-scale prototype detector will be constructed and tested using surrogate neutron sources. The testing will serve to inform the design of the full detector that is to be used as a way of fingerprinting used fuel storage casks based on the neutron signature produced by the used fuel inside the cask.
Decontamination and decommissioning plan for processing contaminated NaK at the INEL
DOE Office of Scientific and Technical Information (OSTI.GOV)
LaRue, D.M.; Dolenc, M.R.
1986-09-01
This decontamination and decommissioning (D D) plan describes the work elements and project management plan for processing four containers of contaminated sodium/potassium (NaK) and returning the Army Reentry Vehicle Facility Site (ARVFS) to a reusable condition. The document reflects the management plan for this project before finalizing the conceptual design and preliminary prototype tests of the reaction kinetics. As a result, the safety, environmental, and accident analyses are addressed as preliminary assessments before completion at a later date. ARVFS contains an earth-covered bunker, a cylindrical test pit and metal shed, and a cable trench connecting the two items. The bunkermore » currently stores the four containers of NaK from the meltdown of the EBR-1 Mark II core. The D D project addressed in this plan involves processing the contaminated NaK and returning the ARVFS to potential reuse after cleanup.« less
Decontamination and decommissioning plan for processing contaminated NaK at the INEL
DOE Office of Scientific and Technical Information (OSTI.GOV)
LaRue, D.M.; Dolenc, M.R.
1986-09-01
This decontamination and decommissioning (D&D) plan describes the work elements and project management plan for processing four containers of contaminated sodium/potassium (NaK) and returning the Army Reentry Vehicle Facility Site (ARVFS) to a reusable condition. The document reflects the management plan for this project before finalizing the conceptual design and preliminary prototype tests of the reaction kinetics. As a result, the safety, environmental, and accident analyses are addressed as preliminary assessments before completion at a later date. ARVFS contains an earth-covered bunker, a cylindrical test pit and metal shed, and a cable trench connecting the two items. The bunker currentlymore » stores the four containers of NaK from the meltdown of the EBR-1 Mark II core. The D&D project addressed in this plan involves processing the contaminated NaK and returning the ARVFS to potential reuse after cleanup.« less
Wang, Ning; Yu, Ping; Hailey, David
2015-08-01
The nursing care plan plays an essential role in supporting care provision in Australian aged care. The implementation of electronic systems in aged care homes was anticipated to improve documentation quality. Standardized nursing terminologies, developed to improve communication and advance the nursing profession, are not required in aged care practice. The language used by nurses in the nursing care plan and the effect of the electronic system on documentation quality in residential aged care need to be investigated. To describe documentation practice for the nursing care plan in Australian residential aged care homes and to compare the quantity and quality of documentation in paper-based and electronic nursing care plans. A nursing documentation audit was conducted in seven residential aged care homes in Australia. One hundred and eleven paper-based and 194 electronic nursing care plans, conveniently selected, were reviewed. The quantity of documentation in a care plan was determined by the number of phrases describing a resident problem and the number of goals and interventions. The quality of documentation was measured using 16 relevant questions in an instrument developed for the study. There was a tendency to omit 'nursing problem' or 'nursing diagnosis' in the nursing process by changing these terms (used in the paper-based care plan) to 'observation' in the electronic version. The electronic nursing care plan documented more signs and symptoms of resident problems and evaluation of care than the paper-based format (48.30 vs. 47.34 out of 60, P<0.01), but had a lower total mean quality score. The electronic care plan contained fewer problem or diagnosis statements, contributing factors and resident outcomes than the paper-based system (P<0.01). Both types of nursing care plan were weak in documenting measurable and concrete resident outcomes. The overall quality of documentation content for the nursing process was no better in the electronic system than in the paper-based system. Omission of the nursing problem or diagnosis from the nursing process may reflect a range of factors behind the practice that need to be understood. Further work is also needed on qualitative aspects of the nurse care plan, nurses' attitudes towards standardized terminologies and the effect of different documentation practice on care quality and resident outcomes. Copyright © 2015 Elsevier Ireland Ltd. All rights reserved.
Acadia National Park ITS field operational test : evaluation strategic plan
DOT National Transportation Integrated Search
2000-07-01
This document provides a strategy for evaluating technologies known as Intelligent Transportation Systems (ITS) that will be implemented in Acadia National Park and Mount Desert Island, Maine. Acadia National Park was selected as a site for an ITS Fi...
Proof of concept deployment plan.
DOT National Transportation Integrated Search
2008-02-01
The U.S. Department of Transportation (USDOT) Next Generation 9-1-1 (NG9-1-1) : Proof-of-Concept (POC) demonstration is envisioned to test key features and : functionalities of the NG9-1-1 system. The Interim POC System Design Document : defines the ...
DOT National Transportation Integrated Search
1999-07-01
This document presents human factors guidelines for designers, owners operators, and planners involved in the development and operation of traffic management centers. Dimensions of the work environment affecting operator and system performance are ad...
The Columbia River Protection Supplemental Technologies Quality Assurance Project Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fix, N. J.
The U.S. Department of Energy (DOE) has conducted interim groundwater remedial activities on the Hanford Site since the mid-1990s for several groundwater contamination plumes. DOE established the Columbia River Protection Supplemental Technologies Project (Technologies Project) in 2006 to evaluate alternative treatment technologies. The objectives for the technology project are as follows: develop a 300 Area polyphosphate treatability test to immobilize uranium, design and test infiltration of a phosphate/apatite technology for Sr-90 at 100-N, perform carbon tetrachloride and chloroform attenuation parameter studies, perform vadose zone chromium characterization and geochemistry studies, perform in situ biostimulation of chromium studies for a reducing barriermore » at 100-D, and perform a treatability test for phytoremediation for Sr-90 at 100-N. This document provides the quality assurance guidelines that will be followed by the Technologies Project. This Quality Assurance Project Plan is based on the quality assurance requirements of DOE Order 414.1C, Quality Assurance, and 10 CFR 830, Subpart A--Quality Assurance Requirements as delineated in Pacific Northwest National Laboratory’s Standards-Based Management System. In addition, the technology project is subject to the Environmental Protection Agency (EPA) Requirements for Quality Assurance Project Plans (EPA/240/B-01/003, QA/R-5). The Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD, DOE/RL-96-68) apply to portions of this project and to the subcontractors. HASQARD requirements are discussed within applicable sections of this plan.« less
Hallett, Nutmeg; Huber, Jörg W; Sixsmith, Judith; Dickens, Geoffrey L
2016-12-01
This paper describes an audit of prevention and management of violence and aggression care plans and incident reporting forms which aimed to: (i) report the compliance rate of completion of care plans; (ii) identify the extent to which patients contribute to and agree with their care plan; (iii) describe de-escalation methods documented in care plans; and (iv) ascertain the extent to which the de-escalation methods described in the care plan are recorded as having been attempted in the event of an incident. Care plans and incident report forms were examined for all patients in men's and women's mental health care pathways who were involved in aggressive incidents between May and October 2012. In total, 539 incidents were examined, involving 147 patients and 121 care plans. There was no care plan in place at the time of 151 incidents giving a compliance rate of 72%. It was documented that 40% of patients had contributed to their care plans. Thematic analysis of de-escalation methods documented in the care plans revealed five de-escalation themes: staff interventions, interactions, space/quiet, activities and patient strategies/skills. A sixth category, coercive strategies, was also documented. Evidence of adherence to de-escalation elements of the care plan was documented in 58% of incidents. The reasons for the low compliance rate and very low documentation of patient involvement need further investigation. The inclusion of coercive strategies within de-escalation documentation suggests that some staff fundamentally misunderstand de-escalation. © 2016 Australian College of Mental Health Nurses Inc.
14 CFR 77.2 - Definition of terms.
Code of Federal Regulations, 2011 CFR
2011-01-01
... approach system is planned and is so indicated by an FAA approved airport layout plan; a military service approved military airport layout plan; any other FAA planning document, or military service military... layout plan, a military service approved military airport layout plan, or by any planning document...
Documenting Living Monuments in Indonesia: Methodology for Sustainable Utility
NASA Astrophysics Data System (ADS)
Suryaningsih, F.; Purwestri, N.
2013-07-01
The systematic documentation of cultural heritage in Indonesia has been developed after the establishment of Bataviaasch Genootschap van Kunsten en Wetenschappen (1778) and De Oudheidkundige Dienst (1913) by the Netherlands Indies government. After Indonesian independent, the tasks of cultural heritage documentation take over by The Ministry of Culture (now become The Ministry of Education of Culture) with focus on the ancient and classical heritage, so called dead monument. The needed of comprehensive documentation data regarding cultural heritage become significant issues since the government and private sector pay attention to the preservation of heritage building in the urban site, so called living monument. The archives of original drawing plan many times do not fit with the existing condition, while the conservation plan demands a document such as built drawing plan to work on. The technology, methodology and system to provide such comprehensive document of heritage building and site become important, to produce good conservation plan and heritage building regular maintenance. It means the products will have a sustainable and various utility values. Since 1994, Documentation Centre for Architecture - Indonesia (PDA), has established to meet the needs of a comprehensive data of heritage building (living monuments), to utilized as basic document for conservation planning. Not only provide document of the digital drawing such site plan, plan, elevation, section and details of architecture elements, but also document of historic research, material analysis and completed with diagnosis and mapping of building damages. This manuscript is about PDA field experience, working in this subject issue
1989-02-01
PLAN A Health and Safety Plan has been developed for the prevention of occupational injuries and illnesses during field activities at RMA. This plan...Bicycloheptadiene BCHPD 0(2) Bromoform CHBR3 100(4) note: total trihalomethanes Cadmium CD 10(1) 5(3)* 10(4) I Carbon tetrachloride CCL4 0(3) 5(4) Chlordane CLDAN...comments, numerous carcinogenicity tests in a variety of animals indicate that aldrin and dieldrin promote only liver tumors and the tumors develop only
NASA Technical Reports Server (NTRS)
Bjorn, L. C.; Martin, M. L.; Murphy, C. W.; Niebla, J. F., V
1971-01-01
This document defines the facilities, equipment, and operational plans required to support the MSS Program at KSC. Included is an analysis of KSC operations, a definition of flow plans, facility utilization and modifications, test plans and concepts, activation, and tradeoff studies. Existing GSE and facilities that have a potential utilization are identified, and new items are defined where possible. The study concludes that the existing facilities are suitable for use in the space station program without major modification from the Saturn-Apollo configuration.
Analytical control test plan and microbiological methods for the water recovery test
NASA Technical Reports Server (NTRS)
Traweek, M. S. (Editor); Tatara, J. D. (Editor)
1994-01-01
Qualitative and quantitative laboratory results are important to the decision-making process. In some cases, they may represent the only basis for deciding between two or more given options or processes. Therefore, it is essential that handling of laboratory samples and analytical operations employed are performed at a deliberate level of conscientious effort. Reporting erroneous results can lead to faulty interpretations and result in misinformed decisions. This document provides analytical control specifications which will govern future test procedures related to all Water Recovery Test (WRT) Phase 3 activities to be conducted at the National Aeronautics and Space Administration/Marshall Space Flight Center (NASA/MSFC). This document addresses the process which will be used to verify analytical data generated throughout the test period, and to identify responsibilities of key personnel and participating laboratories, the chains of communication to be followed, and ensure that approved methodology and procedures are used during WRT activities. This document does not outline specifics, but provides a minimum guideline by which sampling protocols, analysis methodologies, test site operations, and laboratory operations should be developed.
Proceedings for the Advance Planning Briefing for Industry
1990-01-24
Liaison Office TOD - Technical Objective Documents TSR - Tactical Source Region UAV - Unmanned Aerial Vehicle UGT - UnderGround nuclear Test A G.EN D635I...tests in AURORA and underground nuclear tests ( UGT ) and will help develop tactical source region hardening requirements and lead to approaches for TSR...X-Ray theory , lasers, electronic controllers, computers, robotics, etc. Contracting for scientific studies and one-of-a-kind machines will emphasize
NASA Technical Reports Server (NTRS)
Koenig, John C.; Billitti, Joseph W.; Tallon, John M.
1979-01-01
Guidelines are provided to the Field Centers for organization, scheduling, project and cost control, and performance in the areas of project management and operations planning for Photovoltaics Test and Applications. These guidelines may be used in organizing a T and A Project Team for system design/test, site construction and operation, and as the basis for evaluating T and A proposals. The attributes are described for project management and operations planning to be used by the Field Centers. Specifically, all project management and operational issues affecting costs, schedules and performance of photovoltaic systems are addressed. Photovoltaic tests and applications include residential, intermediate load center, central station, and stand-alone systems. The sub-categories of system maturity considered are: Initial System Evaluation Experiments (ISEE); System Readiness Experiments (SRE); and Commercial Readiness Demonstration Projects (CRDP).
Development of an audit instrument for nursing care plans in the patient record
Bjorvell, C; Thorell-Ekstrand, I; Wredling, R
2000-01-01
Objectives—To develop, validate, and test the reliability of an audit instrument that measures the extent to which patient records describe important aspects of nursing care. Material—Twenty records from each of three hospital wards were collected and audited. The auditors were registered nurses with a knowledge of nursing documentation in accordance with the VIPS model—a model designed to structure nursing documentation. (VIPS is an acronym formed from the Swedish words for wellbeing, integrity, prevention, and security.) Methods—An audit instrument was developed by determining specific criteria to be met. The audit questions were aimed at revealing the content of the patient for nursing assessment, nursing diagnosis, planned interventions, and outcome. Each of the 60 records was reviewed by the three auditors independently and the reliability of the instrument was tested by calculating the inter-rater reliability coefficient. Content validity was tested by using an expert panel and calculating the content validity ratio. The criterion related validity was estimated by the correlation between the score of the Cat-ch-Ing instrument and the score of an earlier developed and used audit instrument. The results were then tested by using Pearson's correlation coefficient. Results—The new audit instrument, named Cat-ch-Ing, consists of 17 questions designed to judge the nursing documentation. Both quantity and quality variables are judged on a rating scale from zero to three, with a maximum score of 80. The inter-rater reliability coefficients were 0.98, 0.98, and 0.92, respectively for each group of 20 records, the content validity ratio ranged between 0.20 and 1.0 and the criterion related validity showed a significant correlation of r = 0.68 (p< 0.0001, 95% CI 0.57 to 0.76) between the two audit instruments. Conclusion—The Cat-ch-Ing instrument has proved to be a valid and reliable audit instrument for nursing records when the VIPS model is used as the basis of the documentation. (Quality in Health Care 2000;9:6–13) Key Words: audit instrument; nursing care plans; quality assurance PMID:10848373
Ugalde, Anna; O'Callaghan, Clare; Byard, Clem; Brean, Samantha; MacKay, Jenelle; Boltong, Anna; Davoren, Sondra; Lawson, Deborah; Parente, Phillip; Michael, Natasha; Livingston, Patricia
2018-05-11
While advance care planning holds promise, uptake is variable and it is unclear how well people engage with or comprehend advance care planning. The objective of this study was to explore how people with cancer comprehended advance care plans and examine how accurately advance care planning documentation represented patient wishes. This study used a qualitative descriptive design. Data collection comprised interviews and an examination of participants' existing advance care planning documentation. Participants included those who had any diagnosis of cancer with an advance care plan recorded: Refusal of Treatment Certificate, Statement of Choices, and/or Enduring Power of Attorney (Medical Treatment) at one cancer treatment centre. Fourteen participants were involved in the study. Twelve participants were female (86%). The mean age was 77 (range: 61-91), and participants had completed their advance care planning documentation between 8 and 72 weeks prior to the interview (mean 33 weeks). Three themes were evident from the data: incomplete advance care planning understanding and confidence, limited congruence for attitude and documentation, advance care planning can enable peace of mind. Complete advance care planning understanding was unusual; most participants demonstrated partial comprehension of their own advance care plan, and some indicated very limited understanding. Participants' attitudes and their written document congruence were limited, but advance care planning was seen as helpful. This study highlighted advance care planning was not a completely accurate representation of patient wishes. There is opportunity to improve how patients comprehend their own advance care planning documentation.
Software engineering for ESO's VLT project
NASA Astrophysics Data System (ADS)
Filippi, G.
1994-12-01
This paper reports on the experience at the European Southern Observatory on the application of software engineering techniques to a 200 man-year control software project for the Very Large Telescope (VLT). This shall provide astronomers, before the end of the century, with one of the most powerful telescopes in the world. From the definition of the general model, described in the software management plan, specific activities have been and will be defined: standards for documents and for code development, design approach using a CASE tool, the process of reviewing both documentation and code, quality assurance, test strategy, etc. The initial choices, the current implementation and the future planned activities are presented and, where feedback is already available, pros and cons are discussed.
DOT National Transportation Integrated Search
1999-12-01
The Traceability document consists of brief introductory material and a series of appended Trace Tables. These tables provide complete traceability of ITS User Service Requirements (USR) to elements of the National ITS Architecture. Additional Trace ...
The Challenge of Grounding Planning in Simulation with an Interactive Model Development Environment
NASA Technical Reports Server (NTRS)
Clement, Bradley J.; Frank, Jeremy D.; Chachere, John M.; Smith, Tristan B.; Swanson, Keith J.
2011-01-01
A principal obstacle to fielding automated planning systems is the difficulty of modeling. Physical systems are modeled conventionally based on specification documents and the modeler's understanding of the system. Thus, the model is developed in a way that is disconnected from the system's actual behavior and is vulnerable to manual error. Another obstacle to fielding planners is testing and validation. For a space mission, generated plans must be validated often by translating them into command sequences that are run in a simulation testbed. Testing in this way is complex and onerous because of the large number of possible plans and states of the spacecraft. Though, if used as a source of domain knowledge, the simulator can ease validation. This paper poses a challenge: to ground planning models in the system physics represented by simulation. A proposed, interactive model development environment illustrates the integration of planning and simulation to meet the challenge. This integration reveals research paths for automated model construction and validation.
Test Plan: WIPP bin-scale CH TRU waste tests
DOE Office of Scientific and Technical Information (OSTI.GOV)
Molecke, M.A.
1990-08-01
This WIPP Bin-Scale CH TRU Waste Test program described herein will provide relevant composition and kinetic rate data on gas generation and consumption resulting from TRU waste degradation, as impacted by synergistic interactions due to multiple degradation modes, waste form preparation, long-term repository environmental effects, engineered barrier materials, and, possibly, engineered modifications to be developed. Similar data on waste-brine leachate compositions and potentially hazardous volatile organic compounds released by the wastes will also be provided. The quantitative data output from these tests and associated technical expertise are required by the WIPP Performance Assessment (PA) program studies, and for the scientificmore » benefit of the overall WIPP project. This Test Plan describes the necessary scientific and technical aspects, justifications, and rational for successfully initiating and conducting the WIPP Bin-Scale CH TRU Waste Test program. This Test Plan is the controlling scientific design definition and overall requirements document for this WIPP in situ test, as defined by Sandia National Laboratories (SNL), scientific advisor to the US Department of Energy, WIPP Project Office (DOE/WPO). 55 refs., 16 figs., 19 tabs.« less
Code of Federal Regulations, 2010 CFR
2010-04-01
... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false What planning documents and information are... PROGRAM UNDER TITLE I OF THE WORKFORCE INVESTMENT ACT The MSFW Youth Program § 669.660 What planning...? The required planning documents and other required information and the submission dates for filing are...
Schiff, Gordon D; Reyes Nieva, Harry; Griswold, Paula; Leydon, Nicholas; Ling, Judy; Federico, Frank; Keohane, Carol; Ellis, Bonnie R; Foskett, Cathy; Orav, E John; Yoon, Catherine; Goldmann, Don; Weissman, Joel S; Bates, David W; Biondolillo, Madeleine; Singer, Sara J
2017-08-01
Evaluate application of quality improvement approaches to key ambulatory malpractice risk and safety areas. In total, 25 small-to-medium-sized primary care practices (16 intervention; 9 control) in Massachusetts. Controlled trial of a 15-month intervention including exposure to a learning network, webinars, face-to-face meetings, and coaching by improvement advisors targeting "3+1" high-risk domains: test result, referral, and medication management plus culture/communication issues evaluated by survey and chart review tools. Chart reviews conducted at baseline and postintervention for intervention sites. Staff and patient survey data collected at baseline and postintervention for intervention and control sites. Chart reviews demonstrated significant improvements in documentation of abnormal results, patient notification, documentation of an action or treatment plan, and evidence of a completed plan (all P<0.001). Mean days between laboratory test date and evidence of completed action/treatment plan decreased by 19.4 days (P<0.001). Staff surveys showed modest but nonsignificant improvement for intervention practices relative to controls overall and for the 3 high-risk domains that were the focus of PROMISES. A consortium of stakeholders, quality improvement tools, coaches, and learning network decreased selected ambulatory safety risks often seen in malpractice claims.
NASA Technical Reports Server (NTRS)
Stoecklin, R. L.
1976-01-01
A total of 114 spoiler units were fabricated in a production shop environment, utilizing three graphite epoxy material systems. Production planning paper was generated for each spoiler unit to completely document each production step of each spoiler unit. The graphite epoxy skins were laid up on production tooling using both mechanical and hand layup techniques. Inspection techniques utilized MRB type assessment in the abscence of quality requirements. Each completed spoiler was subjected to ultrasonic inspection utilizing a multicolor recording system that documented each inspection result. In addition, one static test spoiler was sectioned after the test to examine the adhesive filleting to the honeycomb core. Visual examination of the cured adhesives showed excellent results.
20 CFR 668.720 - What information must these planning documents contain?
Code of Federal Regulations, 2010 CFR
2010-04-01
... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false What information must these planning... 166 Planning/Funding Process § 668.720 What information must these planning documents contain? (a) The... planning instructions issued by the Department, the comprehensive services plan must describe in narrative...
Code of Federal Regulations, 2010 CFR
2010-04-01
... letters and documents relating to pension and other plans. 301.6104(a)-3 Section 301.6104(a)-3 Internal... of Internal Revenue Service letters and documents relating to pension and other plans. (a) In general... qualification of a pension, profit-sharing or stock bonus plan under section 401(a), an annuity plan under...
High Stakes Testing, Bilingual Education and Language Endangerment: A Yup'ik Example
ERIC Educational Resources Information Center
Wyman, Leisy; Marlow, Patrick; Andrew, Ciquyaq Fannie; Miller, Gayle; Nicholai, Cikigaq Rachel; Rearden, Yurrliq Nita
2010-01-01
A growing body of research documents how educational policies and accountability systems can open or close "ideological and implementational spaces" for bilingual education, shaping the language planning efforts of Indigenous communities. Using collaborative research, Indigenous and non-Indigenous researchers investigated the…
Residential solar-heating/cooling system
NASA Technical Reports Server (NTRS)
1980-01-01
Report documents progress of residential solar-heating and cooling system development program at 5-month mark of anticipated 17-month program. System design has been completed, and development and component testing has been initiated. Report includes diagrams, operation overview, optimization studies of subcomponents, and marketing plans for system.
Teach Your Computer to Read: Scanners and Optical Character Recognition.
ERIC Educational Resources Information Center
Marsden, Jim
1993-01-01
Desktop scanners can be used with a software technology called optical character recognition (OCR) to convert the text on virtually any paper document into an electronic form. OCR offers educators new flexibility in incorporating text into tests, lesson plans, and other materials. (MLF)
Oleanna Math Program Materials.
ERIC Educational Resources Information Center
Coole, Walter A.
This document is a collection of course outlines, syllabi, and test materials designed for several high school level and lower division mathematics courses taught in an auto-tutorial learning laboratory at Skagit Valley College (Washington). The courses included are: Pre-Algebra, Basic Algebra, Plan Geometry, Intermediate Algebra, Probability and…
DOT National Transportation Integrated Search
2012-08-01
This report presents the test plan for conducting the Technical Capability Analysis for the United States Department of Transportation (U.S. DOT) evaluation of the San Diego Integrated Corridor Management (ICM) Initiative Demonstration. The ICM proje...
DOT National Transportation Integrated Search
2013-06-01
This Demonstration Plan has been prepared to provide guidance and a common definition to all parties of the testing program that will be conducted for the LA-Gateway FRATIS Demonstration Project. More specifically, this document provides: Plannin...
Earth Observing System/Advanced Microwave Sounding Unit-A (EOS/AMSU-A) software management plan
NASA Technical Reports Server (NTRS)
Schwantje, Robert
1994-01-01
This document defines the responsibilites for the management of the like-cycle development of the flight software installed in the AMSU-A instruments, and the ground support software used in the test and integration of the AMSU-A instruments.
DOT National Transportation Integrated Search
1997-01-01
This document reports on the formal evaluation of the targeted (limited but highly focused) deployment of the Advanced Driver and Vehicle Advisory Navigation ConcEpt (ADVANCE), an in-vehicle advanced traveler information system designed to provide sh...
Quality Assurance Program Plan for SFR Metallic Fuel Data Qualification
DOE Office of Scientific and Technical Information (OSTI.GOV)
Benoit, Timothy; Hlotke, John Daniel; Yacout, Abdellatif
2017-07-05
This document contains an evaluation of the applicability of the current Quality Assurance Standards from the American Society of Mechanical Engineers Standard NQA-1 (NQA-1) criteria and identifies and describes the quality assurance process(es) by which attributes of historical, analytical, and other data associated with sodium-cooled fast reactor [SFR] metallic fuel and/or related reactor fuel designs and constituency will be evaluated. This process is being instituted to facilitate validation of data to the extent that such data may be used to support future licensing efforts associated with advanced reactor designs. The initial data to be evaluated under this program were generatedmore » during the US Integral Fast Reactor program between 1984-1994, where the data includes, but is not limited to, research and development data and associated documents, test plans and associated protocols, operations and test data, technical reports, and information associated with past United States Nuclear Regulatory Commission reviews of SFR designs.« less
Implementation of green infrastructure concept in Citarum Watershed
NASA Astrophysics Data System (ADS)
Maryati, Sri; Humaira, An Nisaa'Siti
2017-03-01
Green infrastructure has several benefits compared to grey infrastructure in term of environmental services and sustainability, such as reducing energy consumption, improving air quality, providing carbon sequestration, and increasing property values. Nevertheless in practice, the implementation of the concept in Indonesia is still limited. Implementation of the certain concept has to be guided in planning document. In this paper, green infrastructure concept in the current spatial plan and other planning documents is assessed. The purpose of this research is to figure out how far the green infrastructure concept is integrated into planning system, based on the analysis of planning documents in Citarum Watershed and expert interviews with local stakeholders. Content analysis method is used to analyze the documents and result of interview. The result shows that green infrastructure concept has not been accommodated in spatial plan or other planning documents widely. There are some challenges in implementing the concept including reward and punishment system (incentive and disincentive), coordination, and lack of human resources.
78 FR 40745 - Submission for OMB Review; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-08
.... Description: The Advance Planning Document (APD) process, established in the rules at 45 CFR part 95, subpart F, is the procedure by which States request and obtain approval for Federal financial participation... Advance Planning Document 34 1.2 120 4,896 Operational Advance Planning Document 20 1 30 600 Estimated...
Planning, Conducting, and Documenting Data Analysis for Program Improvement
ERIC Educational Resources Information Center
Winer, Abby; Taylor, Cornelia; Derrington, Taletha; Lucas, Anne
2015-01-01
This 2015 document was developed to help technical assistance (TA) providers and state staff define and limit the scope of data analysis for program improvement efforts, including the State Systemic Improvement Plan (SSIP); develop a plan for data analysis; document alternative hypotheses and additional analyses as they are generated; and…
NASA Technical Reports Server (NTRS)
Banda, Carolyn; Bushnell, David; Chen, Scott; Chiu, Alex; Neukom, Christian; Nishimura, Sayuri; Prevost, Michael; Shankar, Renuka; Staveland, Lowell; Smith, Greg
1992-01-01
This is the Software Concept Document for the Man-machine Integration Design and Analysis System (MIDAS) being developed as part of Phase V of the Army-NASA Aircrew/Aircraft Integration (A3I) Progam. The approach taken in this program since its inception in 1984 is that of incremental development with clearly defined phases. Phase 1 began in 1984 and subsequent phases have progressed at approximately 10-16 month intervals. Each phase of development consists of planning, setting requirements, preliminary design, detailed design, implementation, testing, demonstration and documentation. Phase 5 began with an off-site planning meeting in November, 1990. It is expected that Phase 5 development will be complete and ready for demonstration to invited visitors from industry, government and academia in May, 1992. This document, produced during the preliminary design period of Phase 5, is intended to record the top level design concept for MIDAS as it is currently conceived. This document has two main objectives: (1) to inform interested readers of the goals of the MIDAS Phase 5 development period, and (2) to serve as the initial version of the MIDAS design document which will be continuously updated as the design evolves. Since this document is written fairly early in the design period, many design issues still remain unresolved. Some of the unresolved issues are mentioned later in this document in the sections on specific components. Readers are cautioned that this is not a final design document and that, as the design of MIDAS matures, some of the design ideas recorded in this document will change. The final design will be documented in a detailed design document published after the demonstrations.
NASA Technical Reports Server (NTRS)
Maris, John
2015-01-01
NASA's Traffic Aware Planner (TAP) is a cockpit decision support tool that provides aircrew with vertical and lateral flight-path optimizations with the intent of achieving significant fuel and time savings, while automatically avoiding traffic, weather, and restricted airspace conflicts. A key step towards the maturation and deployment of TAP concerned its operational evaluation in a representative flight environment. This Systems Engineering Management Plan (SEMP) addresses the test-vehicle design, systems integration, and flight-test planning for the first TAP operational flight evaluations, which were successfully completed in November 2013. The trial outcomes are documented in the Traffic Aware Planner (TAP) flight evaluation paper presented at the 14th AIAA Aviation Technology, Integration, and Operations Conference, Atlanta, GA. (AIAA-2014-2166, Maris, J. M., Haynes, M. A., Wing, D. J., Burke, K. A., Henderson, J., & Woods, S. E., 2014).
NASA Engineering and Safety Center (NESC) Enhanced Melamine (ML) Foam Acoustic Test (NEMFAT)
NASA Technical Reports Server (NTRS)
McNelis, Anne M.; Hughes, William O.; McNelis, Mark E.
2014-01-01
The NASA Engineering and Safety Center (NESC) funded a proposal to achieve initial basic acoustic characterization of ML (melamine) foam, which could serve as a starting point for a future, more comprehensive acoustic test program for ML foam. A project plan was developed and implemented to obtain acoustic test data for both normal and enhanced ML foam. This project became known as the NESC Enhanced Melamine Foam Acoustic Test (NEMFAT). This document contains the outcome of the NEMFAT project.
40 CFR 93.118 - Criteria and procedures: Motor vehicle emissions budget.
Code of Federal Regulations, 2012 CFR
2012-07-01
... PLANS Conformity to State or Federal Implementation Plans of Transportation Plans, Programs, and..., consultation among federal, State, and local agencies occurred; full implementation plan documentation was... response to comments that are required to be submitted with any implementation plan. EPA will document its...
40 CFR 93.118 - Criteria and procedures: Motor vehicle emissions budget.
Code of Federal Regulations, 2014 CFR
2014-07-01
... PLANS Conformity to State or Federal Implementation Plans of Transportation Plans, Programs, and..., consultation among federal, State, and local agencies occurred; full implementation plan documentation was... response to comments that are required to be submitted with any implementation plan. EPA will document its...
Input Range Testing for the General Mission Analysis Tool (GMAT)
NASA Technical Reports Server (NTRS)
Hughes, Steven P.
2007-01-01
This document contains a test plan for testing input values to the General Mission Analysis Tool (GMAT). The plan includes four primary types of information, which rigorously define all tests that should be performed to validate that GMAT will accept allowable inputs and deny disallowed inputs. The first is a complete list of all allowed object fields in GMAT. The second type of information, is test input to be attempted for each field. The third type of information is allowable input values for all objects fields in GMAT. The final piece of information is how GMAT should respond to both valid and invalid information. It is VERY important to note that the tests below must be performed for both the Graphical User Interface and the script!! The examples are illustrated using a scripting perspective, because it is simpler to write up. However, the test must be performed for both interfaces to GMAT.
Corridor Planning And Feasibility Analysis Corridor, Master Plan
DOT National Transportation Integrated Search
1996-04-01
THE I-70 RURAL IVHS CORRIDOR MASTER PLAN IS THE GUIDANCE DOCUMENT FOR DEPLOYMENT OF THE INTELLIGENT TRANSPORTATION SYSTEM (ITS) FOR THE INTERSTATE-70 CORRIDOR FROM DENVER TO GLENWOOD SPRINGS, COLORADO. AS A WORKING DOCUMENT, THE PLAN RECOMMENDS STRAT...
A practical guide on DTA model applications for regional planning
DOT National Transportation Integrated Search
2016-06-07
This document is intended as a guide for use by Metropolitan Planning Organizations (MPO) and other planning agencies that are interested in applying Dynamic Traffic Assignment (DTA) models for planning applications. The objective of this document is...
78 FR 37819 - Submission for OMB Review; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-24
.... Description: The Advance Planning Document (APD) process, established in the rules at 45 CFR Part 95, Subpart F, is the procedure by which States request and obtain approval for Federal financial participation... Advance Planning Document 34 1.2 120 4,896 Operational Advance Planning Document 20 1 30 600 [[Page 37820...
30 CFR 254.4 - May I reference other documents in my response plan?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 2 2010-07-01 2010-07-01 false May I reference other documents in my response plan? 254.4 Section 254.4 Mineral Resources MINERALS MANAGEMENT SERVICE, DEPARTMENT OF THE INTERIOR... May I reference other documents in my response plan? You may reference information contained in other...
NOAA Office of Exploration and Research > About OER > Strategic Plan
Organization Guiding Documents Organizational Structure Map of Staff and Affiliate Locations Strategic Plan Media News Room OER Symposium Overview Organization Guiding Documents Organizational Structure Map of Strategic Plan Home About OER Overview Organization Guiding Documents Organizational Structure Map of Staff
45 CFR 1355.54 - Submittal of advance planning documents.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 45 Public Welfare 4 2010-10-01 2010-10-01 false Submittal of advance planning documents. 1355.54 Section 1355.54 Public Welfare Regulations Relating to Public Welfare (Continued) OFFICE OF HUMAN... § 1355.54 Submittal of advance planning documents. The State title IV-E agency must submit an APD for a...
NASA Technical Reports Server (NTRS)
Idris, Husni; Vivona, Robert A.; Al-Wakil, Tarek
2009-01-01
This document describes exploratory research on a distributed, trajectory oriented approach for traffic complexity management. The approach is to manage traffic complexity based on preserving trajectory flexibility and minimizing constraints. In particular, the document presents metrics for trajectory flexibility; a method for estimating these metrics based on discrete time and degree of freedom assumptions; a planning algorithm using these metrics to preserve flexibility; and preliminary experiments testing the impact of preserving trajectory flexibility on traffic complexity. The document also describes an early demonstration capability of the trajectory flexibility preservation function in the NASA Autonomous Operations Planner (AOP) platform.
Earth Observing System (EOS)/Advanced Microwave Sounding Unit-A (AMSU-A) software assurance plan
NASA Technical Reports Server (NTRS)
Schwantje, Robert; Smith, Claude
1994-01-01
This document defines the responsibilities of Software Quality Assurance (SOA) for the development of the flight software installed in EOS/AMSU-A instruments, and the ground support software used in the test and integration of the EOS/AMSU-A instruments.
Technical Objective Document for Food and Food Service Systems
1990-10-01
full ntission posture for exlended duration . 3. POCGRESS AND ACCa -fPLISHMENI’S Natick is responsible for many Research, Development, Test , and...Dr. David L. Kaplan Telephone (508) 651-5525 (Biotechnology) b. Technology Program (1) FY91 Planned Programs Complete Joint Services Front End
Organizing for low cost space operations - Status and plans
NASA Technical Reports Server (NTRS)
Lee, C.
1976-01-01
Design features of the Space Transportation System (vehicle reuse, low cost expendable components, simple payload interfaces, standard support systems) must be matched by economical operational methods to achieve low operating and payload costs. Users will be responsible for their own payloads and will be charged according to the services they require. Efficient use of manpower, simple documentation, simplified test, checkout, and flight planning are firm goals, together with flexibility for quick response to varying user needs. Status of the Shuttle hardware, plans for establishing low cost procedures, and the policy for user charges are discussed.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 42 Public Health 5 2011-10-01 2011-10-01 false Health information technology planning advance... STANDARDS FOR THE ELECTRONIC HEALTH RECORD TECHNOLOGY INCENTIVE PROGRAM Requirements Specific to the Medicaid Program § 495.336 Health information technology planning advance planning document requirements...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 42 Public Health 5 2013-10-01 2013-10-01 false Health information technology planning advance... STANDARDS FOR THE ELECTRONIC HEALTH RECORD TECHNOLOGY INCENTIVE PROGRAM Requirements Specific to the Medicaid Program § 495.336 Health information technology planning advance planning document requirements...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 42 Public Health 5 2012-10-01 2012-10-01 false Health information technology planning advance... STANDARDS FOR THE ELECTRONIC HEALTH RECORD TECHNOLOGY INCENTIVE PROGRAM Requirements Specific to the Medicaid Program § 495.336 Health information technology planning advance planning document requirements...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 42 Public Health 5 2014-10-01 2014-10-01 false Health information technology planning advance... STANDARDS FOR THE ELECTRONIC HEALTH RECORD TECHNOLOGY INCENTIVE PROGRAM Requirements Specific to the Medicaid Program § 495.336 Health information technology planning advance planning document requirements...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 5 2010-10-01 2010-10-01 false Health information technology planning advance... STANDARDS FOR THE ELECTRONIC HEALTH RECORD TECHNOLOGY INCENTIVE PROGRAM Requirements Specific to the Medicaid Program § 495.336 Health information technology planning advance planning document requirements...
Reliability program requirements for aeronautical and space system contractors
NASA Technical Reports Server (NTRS)
1987-01-01
General reliability program requirements for NASA contracts involving the design, development, fabrication, test, and/or use of aeronautical and space systems including critical ground support equipment are prescribed. The reliability program requirements require (1) thorough planning and effective management of the reliability effort; (2) definition of the major reliability tasks and their place as an integral part of the design and development process; (3) planning and evaluating the reliability of the system and its elements (including effects of software interfaces) through a program of analysis, review, and test; and (4) timely status indication by formal documentation and other reporting to facilitate control of the reliability program.
It's Time to Develop a New "Draft Test Protocol" for a Mars Sample Return Mission (or Two…).
Rummel, John D; Kminek, Gerhard
2018-04-01
The last time NASA envisioned a sample return mission from Mars, the development of a protocol to support the analysis of the samples in a containment facility resulted in a "Draft Test Protocol" that outlined required preparations "for the safe receiving, handling, testing, distributing, and archiving of martian materials here on Earth" (Rummel et al., 2002 ). This document comprised a specific protocol to be used to conduct a biohazard test for a returned martian sample, following the recommendations of the Space Studies Board of the US National Academy of Sciences. Given the planned launch of a sample-collecting and sample-caching rover (Mars 2020) in 2 years' time, and with a sample return planned for the end of the next decade, it is time to revisit the Draft Test Protocol to develop a sample analysis and biohazard test plan to meet the needs of these future missions. Key Words: Biohazard detection-Mars sample analysis-Sample receiving facility-Protocol-New analytical techniques-Robotic sample handling. Astrobiology 18, 377-380.
Testing and Validation of Timing Properties for High Speed Digital Cameras - A Best Practices Guide
2016-07-27
a five year plan to begin replacing its inventory of antiquated film and video systems with more modern and capable digital systems. As evidenced in...installation, testing, and documentation of DITCS. If shop support can be accelerated due to shifting mission priorities, this schedule can likely...assistance from the machine shop , welding shop , paint shop , and carpenter shop . Testing the DITCS system will require a KTM with digital cameras and
Code of Federal Regulations, 2010 CFR
2010-10-01
... approve planning or design documents prepared by the Self-Governance Tribe? 137.361 Section 137.361 Public... OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Roles of the Secretary in... opportunities to approve planning or design documents prepared by the Self-Governance Tribe? Yes, but only if...
Technical Evaluation Motor No. 10 (TEM-10)
NASA Technical Reports Server (NTRS)
1993-01-01
Technical Evaluation Motor No. 10 (TEM-10) was static fired on 27 Apr. 1993 at the Thiokol Corporation full-scale motor static test bay, T-24. This final test report documents the procedures, performance, and results of the static test firing of TEM-10. All observations, discussions, conclusions, and recommendations contained are final. Included is a presentation and discussion of TEM-10 performance, anomalies, and test results in concurrence with the objectives outlined in CTP-0110, Revision D, Space Shuttle Technical Evaluation Motor No. 10 (TEM-10) Static Fire Test Plan.
Initial Results from the Third Round of Remediated Nitrate Salt Surrogate Formulation and Testing
DOE Office of Scientific and Technical Information (OSTI.GOV)
Brown, Geoffrey Wayne; Leonard, Philip; Hartline, Ernest Leon
2016-04-20
High explosives science and technology (M-7) is currently working on the third round of formulation and testing of Remediated nitrate salt (RNS) surrogates. This report summarizes the calorimetry results from the 15% sWheat mixtures. All formulation and testing was carried out according to PLAN-TA9-2443 Rev B, "Remediated Nitrate Salt (RNS) surrogate formulation and testing standard procedure", released February 16, 2016. Results from the first and second rounds of formulation and testing were documented in memoranda M7-16-6042 and M7-16-6053.
EPRI/DOE High Burnup Fuel Sister Pin Test Plan Simplification and Visualization
DOE Office of Scientific and Technical Information (OSTI.GOV)
Saltzstein, Sylvia J.; Sorenson, Ken B.; Hanson, Brady
The EPRI/DOE High Burnup Confirmatory Data Project (herein called the "Demo") is a multi-year, multi-entity confirmation demonstration test with the purpose of providing quantitative and qualitative data to show how high-burnup fuel ages in dry storage over a ten-year period. The Demo involves obtaining 32 assemblies of high-burnup PWR fuel of four common cladding alloys from the North Anna Nuclear Power Plant, drying them according to standard plant procedures, and then storing them in an NRC-licensed TN-3 2B cask on the North Anna dry storage pad for ten years. After the ten-year storage time, the cask will be opened andmore » the rods will be examined for signs of aging. Twenty-five rods from assemblies of similar claddings, in-reactor placement, and burnup histories (herein called "sister rods") have been shipped from the North Anna Nuclear Power Plant and are currently being nondestructively tested at Oak Ridge National Laboratory. After the non-destructive testing has been completed for each of the twenty-five rods, destructive analysis will be performed at ORNL, PNNL, and ANL to obtain mechanical data. Opinions gathered from the expert interviews, ORNL and PNNL Sister Rod Test Plans, and numerous meetings has resulted in the Simplified Test Plan described in this document. Some of the opinions and discussions leading to the simplified test plan are included here. Detailed descriptions and background are in the ORNL and PNNL plans in the appendices . After the testing described in this simplified test plan h as been completed , the community will review all the collected data and determine if additional testing is needed.« less
"Investment in Education" and the Tests of Time
ERIC Educational Resources Information Center
Loxley, Andrew; Seery, Aidan; Walsh, John
2014-01-01
Thirty years after the publication of "Investment in Education," Patrick Clancy wrote that the report represented "the" foundation document of education' in the era since the introduction of economic planning in the late 1950s. This paper considers the importance of the report in disseminating theories of human capital…
Drilling Machines: Vocational Machine Shop.
ERIC Educational Resources Information Center
Thomas, John C.
The lessons and supportive information in this field tested instructional block provide a guide for teachers in developing a machine shop course of study in drilling. The document is comprised of operation sheets, information sheets, and transparency masters for 23 lessons. Each lesson plan includes a performance objective, material and tools,…
Standard practices for the implementation of computer software
NASA Technical Reports Server (NTRS)
Irvine, A. P. (Editor)
1978-01-01
A standard approach to the development of computer program is provided that covers the file cycle of software development from the planning and requirements phase through the software acceptance testing phase. All documents necessary to provide the required visibility into the software life cycle process are discussed in detail.
A. Henne
1978-01-01
Nutzwertanalyse (NUWA) is a psychometric instrument for finding the test compromise in the multiple use planning of forestry, when the multiple objectives cannot be expressed in the same physical or monetary unit. It insures a systematic assessment of the consequences of proposed alternatives and thoroughly documents the decision process. The method leads to a ranking...
Legislative Framework for Landscape Planning in Latvia
NASA Astrophysics Data System (ADS)
Nitavska, Natalija; Zigmunde, Daiga
2017-10-01
With the adoption and the ratification of the European Landscape Convention a legally justified need for a clear landscape policy was grounded in the European countries. It includes the elaboration of the new and the improvement of the existing legislative documents on landscape planning, protection and management. The aim of the particular study is to analyse the existing legislative documents in Latvia influencing landscape planning on different scales / and the implementation of the European Landscape Convention. The study emphasizes the complex structure of the Latvian legislative framework affected by the distribution of the normative documents under the various ministries. Therefore, the main problem is unclear responsibility levels and organizational system for solving the issues regarding landscape planning, protection and management. Thus the various discussions between the involved disciplines and responsible institutions are arising. Two groups of the legislative documents influencing the implementation of the landscape policy in Latvia are detected within the study. The first group is strategic documents determining main landscape planning principles and directions at European, national, regional and professional or sectoral level. The second group is operational documents providing a set of actions for the landscape planning, protection and management at the local or the municipality level. The study concludes that operational documents developed by the municipalities are in high importance because of their direct influence on the landscape planning in Latvia. This often leads to the different landscape planning requirements included in the normative documents of the neighbouring municipalities, although the spatial and ecological borders of the visual landscape do not fit with the formal borders of the municipalities. Thus, it is essential to develop the common principles and actions that would be incumbent on all municipalities to provide the landscape integrity and to protect its values according to the main principles defined in the European Landscape Convention.
Northwest Forest Plan research synthesis.
Richard W. Haynes; Gloria E. Perez; [tech. eds.].
2000-01-01
This document synthesizes research accomplishments initiated and funded under the Northwest Forest Plan or the Presidentâs Forest Plan (hereafter referred to as the Forest Plan) since its inception in 1994. Three major parts in this document cover, the context for this effort, eight Forest Plan research accomplishments, and a synthesis. The eight accomplishments...
Solid waste information and tracking system client-server conversion project management plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
May, D.L.
1998-04-15
This Project Management Plan is the lead planning document governing the proposed conversion of the Solid Waste Information and Tracking System (SWITS) to a client-server architecture. This plan presents the content specified by American National Standards Institute (ANSI)/Institute of Electrical and Electronics Engineers (IEEE) standards for software development, with additional information categories deemed to be necessary to describe the conversion fully. This plan is a living document that will be reviewed on a periodic basis and revised when necessary to reflect changes in baseline design concepts and schedules. This PMP describes the background, planning and management of the SWITS conversion.more » It does not constitute a statement of product requirements. Requirements and specification documentation needed for the SWITS conversion will be released as supporting documents.« less
von Krogh, Gunn; Nåden, Dagfinn
2008-04-01
To describe and discuss theoretical and methodological issues of implementation of a nursing services documentation model comprising NANDA nursing diagnoses, Nursing Intervention Classification and Nursing Outcome Classification terminologies. The model is developed for electronic patient record and was implemented in a psychiatric hospital on an organizational level and on five test wards in 2001-2005. The theory of Rogers guided the process of innovation, whereas the implementation procedure of McCloskey and Bulecheck combined with adult learning principals guided the test site implementation. The test wards managed in different degrees to adopt the model. Two wards succeeded fully, including a ward with high percentage of staff with interdisciplinary background. Better planning regarding the impact of the organization's innovative aptitude, the innovation strategies and the use of differentiated methods regarding the clinician's individual premises for learning nursing terminologies might have enhanced the adoption to the model. To better understand the nature of barriers and the importance of careful planning regarding the implementation of electronic patient record elements in nursing care services, focusing on nursing terminologies. Further to indicate how a theory and specific procedure can be used to guide the process of implementation throughout the different levels of management.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Glissmeyer, John A.; Antonio, Ernest J.; Flaherty, Julia E.
2016-02-29
This document reports on a series of tests conducted to assess the proposed air sampling location for the National Research Universal reactor (NRU) complex exhaust stack, located in Chalk River, Ontario, Canada, with respect to the applicable criteria regarding the placement of an air sampling probe. Due to the age of the equipment in the existing monitoring system, and the increasing difficulty in acquiring replacement parts to maintain this equipment, a more up-to-date system is planned to replace the current effluent monitoring system, and a new monitoring location has been proposed. The new sampling probe should be located within themore » exhaust stack according to the criteria established by the American National Standards Institute/Health Physics Society (ANSI/HPS) N13.1-1999, Sampling and Monitoring Releases of Airborne Radioactive Substances from the Stack and Ducts of Nuclear Facilities. These criteria address the capability of the sampling probe to extract a sample that represents the effluent stream. The internal Pacific Northwest National Laboratory (PNNL) project for this task was 65167, Atomic Energy Canada Ltd. Chalk River Effluent Duct Flow Qualification. The testing described in this document was guided by the Test Plan: Testing of the NRU Stack Air Sampling Position (TP-STMON-032).« less
Jayasuriya, R; Sim, A B
1998-01-01
Hospitals are under pressure to respond to new challenges and competition. Many hospitals have used strategic planning to respond to these environmental changes. This exploratory study examines the extent of strategic planning in hospitals in two Australian States, New South Wales and Victoria, using a sample survey. Based on planning documentation, the study indicated that 47% of the hospitals surveyed did not have a strategic or business plan. A significant difference was found in the comprehensiveness of the plans between the two States. Plans from Victorian hospitals had more documented evidence of external/internal analysis, competitor orientation and customer orientation compared with plans from New South Wales hospitals. The paper discusses the limitations of the study and directions for future research.
Development and evaluation of an aged care specific Advance Care Plan.
Silvester, William; Parslow, Ruth A; Lewis, Virginia J; Fullam, Rachael S; Sjanta, Rebekah; Jackson, Lynne; White, Vanessa; Hudson, Rosalie
2013-06-01
To report on the quality of advance care planning (ACP) documents in use in residential aged care facilities (RACF) in areas of Victoria Australia prior to a systematic intervention; to report on the development and performance of an aged care specific Advance Care Plan template used during the intervention. An audit of the quality of pre-existing documentation used to record resident treatment preferences and end-of-life wishes at participating RACFs; development and pilot of an aged care specific Advance Care Plan template; an audit of the completeness and quality of Advance Care Plans completed on the new template during a systematic ACP intervention. 19 selected RACFs (managed by 12 aged care organisations) in metropolitan and regional areas of Victoria. Documentation in use at facilities prior to the ACP intervention most commonly recorded preferences regarding hospital transfer, life prolonging treatment and personal/cultural/religious wishes. However, 7 of 12 document sets failed to adequately and clearly specify the resident's preferences as regards life prolonging medical treatment. The newly developed aged care specific Advance Care Plan template was met with approval by participating RACFs. Of 203 Advance Care Plans completed on the template throughout the project period, 49% included the appointment of a Medical Enduring Power of Attorney. Requests concerning medical treatment were specified in almost all completed documents (97%), with 73% nominating the option of refusal of life-prolonging treatment. Over 90% of plans included information concerning residents' values and beliefs, and future health situations that the resident would find to be unacceptable were specified in 78% of completed plans. Standardised procedures and documentation are needed to improve the quality of processes, documents and outcomes of ACP in the residential aged care sector.
End-of-life care of oncology inpatients: Are we getting it right?
Batten, Monique; Nguyen, Bella; Burke, Brandon; Harryanto, Hilman; Mitchell, Imogen; Davis, Alison
2018-06-13
To examine the current patterns of end-of-life care of medical oncology patients dying in an Australian tertiary acute hospital setting in order to determine potential areas for improvement. A retrospective observational study was undertaken of 295 consecutive adult medical oncology inpatients dying between 2010 and 2015. Charts were reviewed for evidence of (1) resuscitation plans, (2) acute interventions in the 48-h period prior to death, (3) palliative care involvement and (4) recognition of the dying patient and comfort care plans. At the time of death, 98% of patients had a resuscitation plan, 71% of which were completed by the medical oncology team. Fifty-nine percent of medical emergency team reviews occurred in patients without a documented resuscitation plan. Within 48 h of death, active interventions were still being given to 64% of patients in the total patient population. Comfort care plans were documented in 86% of patients; however, 62% of these were only documented within 48 h of death and 20% of patients with a documented comfort care plan still received noncomfort measures. There was a high level of documented resuscitation plans, comfort care plans and recognition of dying. However, active interventions were common within 48 h of death, and comfort care plans and recognition of dying often occurred late. These data indicate a gap between documenting a resuscitation plan and providing timely and appropriate end-of-life care. Understanding the gaps in delivering appropriate care provides an opportunity for improving end-of-life care. © 2018 John Wiley & Sons Australia, Ltd.
Code of Federal Regulations, 2010 CFR
2010-04-01
... and Research Funds § 420.111 What are the documentation requirements for use of FHWA planning and... 23 Highways 1 2010-04-01 2010-04-01 false What are the documentation requirements for use of FHWA planning and research funds? 420.111 Section 420.111 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF...
Code of Federal Regulations, 2010 CFR
2010-04-01
...-DETERMINATION AND EDUCATION ACT Other Financial Assistance for Planning and Negotiation Grants for Non-BIA... documents received or utilized after OSG has made a decision on a planning grant application? 1000.69... selection documents received or utilized after OSG has made a decision on a planning grant application? A...
3 CFR - Unified Command Plan 2011
Code of Federal Regulations, 2012 CFR
2012-01-01
... 3 The President 1 2012-01-01 2012-01-01 false Unified Command Plan 2011 Presidential Documents Other Presidential Documents Memorandum of April 6, 2011 Unified Command Plan 2011 Memorandum for the... implementation of the revised Unified Command Plan. Consistent with title 10, United States Code, section 161(b...
75 FR 9334 - Multiemployer Pension Plan Information Made Available on Request
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-02
..., strategies) that, if disclosed by the plan, may cause, or increase a reasonable risk of, financial harm to... certain actuarial and financial documents about the plan to participants, beneficiaries, employee... request, shall furnish copies of certain actuarial and financial documents to any plan participant...
Kearns, Randy D; Cairns, Bruce A; Hickerson, William L; Holmes, James H
2014-01-01
The Southern Region of the American Burn Association began to craft a regional plan to address a surge of burn-injured patients after a mass casualty event in 2004. Published in 2006, this plan has been tested through modeling, exercise, and actual events. This article focuses on the process of how the plan was created, how it was tested, and how it interfaces with other ongoing efforts on preparedness. One key to success regarding how people respond to a disaster can be traced to preexisting relationships and collaborations. These activities would include training or working together and building trust long before the crisis. Knowing who you can call and rely on when you need help, within the context of your plan, can be pivotal in successfully managing a disaster. This article describes how a coalition of burn center leaders came together. Their ongoing personal association has facilitated the development of planning activities and has kept the process dynamic. This article also includes several of the building blocks for developing a plan from creation to composition, implementation, and testing. The plan discussed here is an example of linking leadership, relationships, process, and documentation together. On the basis of these experiences, the authors believe these elements are present in other regions. The intent of this work is to share an experience and to offer it as a guide to aid others in their regional burn disaster planning efforts.
Dodge, Kent A.; Lambing, John H.
2006-01-01
A quality-assurance plan has been developed for use by the sediment laboratory of the U.S. Geological Survey Montana Water Science Center in conducting activities related to the analysis of suspended sediment. The plan documents quality-assurance policies for sediment-laboratory certification, personnel responsibilities and training, documentation requirements, and laboratory safety. The plan also documents quality-assurance procedures related to laboratory equipment and supplies, sample management, sample analysis, analytical quality control, and data management.
222-S Laboratory Quality Assurance Plan. Revision 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
Meznarich, H.K.
1995-07-31
This Quality Assurance Plan provides,quality assurance (QA) guidance, regulatory QA requirements (e.g., 10 CFR 830.120), and quality control (QC) specifications for analytical service. This document follows the U.S Department of Energy (DOE) issued Hanford Analytical Services Quality Assurance Plan (HASQAP). In addition, this document meets the objectives of the Quality Assurance Program provided in the WHC-CM-4-2, Section 2.1. Quality assurance elements required in the Guidelines and Specifications for Preparing Quality Assurance Program Plans (QAMS-004) and Interim Guidelines and Specifications for Preparing Quality Assurance Project Plans (QAMS-005) from the US Environmental Protection Agency (EPA) are covered throughout this document. A qualitymore » assurance index is provided in the Appendix A. This document also provides and/or identifies the procedural information that governs laboratory operations. The personnel of the 222-S Laboratory and the Standards Laboratory including managers, analysts, QA/QC staff, auditors, and support staff shall use this document as guidance and instructions for their operational and quality assurance activities. Other organizations that conduct activities described in this document for the 222-S Laboratory shall follow this QA/QC document.« less
[Integration of the radiotherapy irradiation planning in the digital workflow].
Röhner, F; Schmucker, M; Henne, K; Momm, F; Bruggmoser, G; Grosu, A-L; Frommhold, H; Heinemann, F E
2013-02-01
At the Clinic of Radiotherapy at the University Hospital Freiburg, all relevant workflow is paperless. After implementing the Operating Schedule System (OSS) as a framework, all processes are being implemented into the departmental system MOSAIQ. Designing a digital workflow for radiotherapy irradiation planning is a large challenge, it requires interdisciplinary expertise and therefore the interfaces between the professions also have to be interdisciplinary. For every single step of radiotherapy irradiation planning, distinct responsibilities have to be defined and documented. All aspects of digital storage, backup and long-term availability of data were considered and have already been realized during the OSS project. After an analysis of the complete workflow and the statutory requirements, a detailed project plan was designed. In an interdisciplinary workgroup, problems were discussed and a detailed flowchart was developed. The new functionalities were implemented in a testing environment by the Clinical and Administrative IT Department (CAI). After extensive tests they were integrated into the new modular department system. The Clinic of Radiotherapy succeeded in realizing a completely digital workflow for radiotherapy irradiation planning. During the testing phase, our digital workflow was examined and afterwards was approved by the responsible authority.
42 CFR 495.326 - Disallowance of FFP.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., requirements, and other undertakings described in the approved HIT planning advance planning document and HIT implementation advance planning document to the detriment of the proper and efficient operation of the Medicaid program, payment of FFP may be disallowed. In the case of a suspension of approval of a HIT planning...
Connected Vehicle Impacts on Transportation Planning—Outreach to Planning Community.
DOT National Transportation Integrated Search
2016-06-01
This document presents outreach memos on 11 case studies analyzing the impacts of connected and automated vehicles (C/AV) on transportation planning products. These 11 case studies are documented indepth in the associated project document entitled Co...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chancellor, Christopher John
2016-11-07
The purpose of this report is to present the results of the acceptable knowledge (AK) review of oxidizers present in active waste streams, provide a technical analysis of the oxidizers, and report the results of the scoping study testing. This report will determine the fastest burning oxidizer to be used in the development of a Test Plan for Preparation and Testing of Sorbents Mixed with Oxidizer found in Transuranic Waste (DWT-TP-001). The companion report, DWT-RPT-002, Sorbent Scoping Studies, contains similar information for sorbents identified during the AK review of TRU waste streams. The results of the oxidizer and sorbent scopingmore » studies will be used to inform the QL1 test plan. The QL1 test results will support the development of a basis of knowledge document that will evaluate oxidizing chemicals and sorbents in TRU waste and provide guidance for treatment.« less
Hutchison, N.E.; Harbaugh, A.W.; Holloway, R.A.; Merk, C.F.
1987-01-01
The Water Resources Division (WRD) of the U.S. Geological Survey is evaluating 32-bit microcomputers to determine how they can complement, and perhaps later replace, the existing network of minicomputers. The WRD is also designing a National Water Information System (NWIS) that will combine and integrate the existing National Water Data Storage and Retrieval System (WATSTORE), National Water Data Exchange (NAWDEX), and components of several other existing systems. The procedures and testing done in a market evaluation of 32-bit microcomputers are documented. The results of the testing are documented in the NWIS Project Office. The market evaluation was done to identify commercially available hardware and software that could be used for implementing early NWIS prototypes to determine the applicability of 32-bit microcomputers for data base and general computing applications. Three microcomputers will be used for these prototype studies. The results of the prototype studies will be used to compile requirements for a Request for Procurement (RFP) for hardware and software to meet the WRD 's needs in the early 1990's. The identification of qualified vendors to provide the prototype hardware and software included reviewing industry literature, and making telephone calls and personal visits to prospective vendors. Those vendors that appeared to meet general requirements were required to run benchmark tests. (Author 's abstract)
U.S. Coast Guard Telecommunications Plan (TCP) - Development Document
DOT National Transportation Integrated Search
1997-04-28
The Coast Guard Telecommunications Plan (TCP) describes the near to mid-term telecommunications goals and objectives for Command, Control, and Communications (C3) support. It is intended to document internal telecommunications planning and to provide...
DOE Office of Scientific and Technical Information (OSTI.GOV)
DUNCAN JB; HUBER HJ
2011-06-08
This report documents the preparation of three actual Hanford tank waste samples for shipment to the Savannah River National Laboratory (SRNL). Two of the samples were dissolved saltcakes from tank 241-AN-103 (hereafter AN-103) and tank 241-SX-105 (hereafter SX-105); one sample was a supernate composite from tanks 241-AZ-101 and 241-AZ-102 (hereafter AZ-101/102). The preparation of the samples was executed following the test plans LAB-PLAN-10-00006, Test Plan for the Preparation of Samples from Hanford Tanks 241-SX-105, 241-AN-103, 241-AN-107, and LAB-PLN-10-00014, Test Plan for the Preparation of a Composite Sample from Hanford Tanks 241-AZ-101 and 241-AZ-102 for Steam Reformer Testing at the Savannahmore » River National Laboratory. All procedural steps were recorded in laboratory notebook HNF-N-274 3. Sample breakdown diagrams for AN-103 and SX-105 are presented in Appendix A. The tank samples were prepared in support of a series of treatability studies of the Fluidized Bed Steam Reforming (FBSR) process using a Bench-Scale Reformer (BSR) at SRNL. Tests with simulants have shown that the FBSR mineralized waste form is comparable to low-activity waste glass with respect to environmental durability (WSRC-STI-2008-00268, Mineralization of Radioactive Wastes by Fluidized Bed Steam Reforming (FBSR): Comparisons to Vitreous Waste Forms and Pertinent Durability Testing). However, a rigorous assessment requires long-term performance data from FB SR product formed from actual Hanford tank waste. Washington River Protection Solutions, LLC (WRPS) has initiated a Waste Form Qualification Program (WP-S.2.1-20 1 0-00 1, Fluidized Bed Steam Reformer Low-level Waste Form Qualification) to gather the data required to demonstrate that an adequate FBSR mineralized waste form can be produced. The documentation of the selection process of the three tank samples has been separately reported in RPP-48824, 'Sample Selection Process for Bench-Scale Steam Reforming Treatability Studies Using Hanford Waste Samples.'« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
DUNCAN JB; HUBER HJ
2011-04-21
This report documents the preparation of three actual Hanford tank waste samples for shipment to the Savannah River National Laboratory (SRNL). Two of the samples were dissolved saltcakes from tank 241-AN-103 (hereafter AN-103) and tank 241-SX-105 (hereafter SX-105); one sample was a supernate composite from tanks 241-AZ-101 and 241-AZ-102 (hereafter AZ-101/102). The preparation of the samples was executed following the test plans LAB-PLAN-10-00006, Test Plan for the Preparation of Samples from Hanford Tanks 241-SX-105, 241-AN-103, 241-AN-107, and LAB-PLN-l0-00014, Test Plan for the Preparation of a Composite Sample from Hanford Tanks 241-AZ-101 and 241-AZ-102 for Steam Reformer Testing at the Savannahmore » River National Laboratory. All procedural steps were recorded in laboratory notebook HNF-N-274 3. Sample breakdown diagrams for AN-103 and SX-105 are presented in Appendix A. The tank samples were prepared in support of a series of treatability studies of the Fluidized Bed Steam Reforming (FBSR) process using a Bench-Scale Reformer (BSR) at SRNL. Tests with simulants have shown that the FBSR mineralized waste form is comparable to low-activity waste glass with respect to environmental durability (WSRC-STI-2008-00268, Mineralization of Radioactive Wastes by Fluidized Bed Steam Reforming (FBSR): Comparisons to Vitreous Waste Forms and Pertinent Durability Testing). However, a rigorous assessment requires long-term performance data from FBSR product formed from actual Hanford tank waste. Washington River Protection Solutions, LLC (WRPS) has initiated a Waste Form Qualification Program (WP-5.2.1-2010-001, Fluidized Bed Steam Reformer Low-level Waste Form Qualification) to gather the data required to demonstrate that an adequate FBSR mineralized waste form can be produced. The documentation of the selection process of the three tank samples has been separately reported in RPP-48824, Sample Selection Process for Bench-Scale Steam Reforming Treatability Studies Using Hanford Waste Samples.« less
NASA Technical Reports Server (NTRS)
Beeson, Harold D.; Davis, Dennis D.; Ross, William L., Sr.; Tapphorn, Ralph M.
2002-01-01
This document represents efforts accomplished at the NASA Johnson Space Center White Sands Test Facility (WSTF) in support of the Enhanced Technology for Composite Overwrapped Pressure Vessels (COPV) Program, a joint research and technology effort among the U.S. Air Force, NASA, and the Aerospace Corporation. WSTF performed testing for several facets of the program. Testing that contributed to the Task 3.0 COPV database extension objective included baseline structural strength, failure mode and safe-life, impact damage tolerance, sustained load/impact effect, and materials compatibility. WSTF was also responsible for establishing impact protection and control requirements under Task 8.0 of the program. This included developing a methodology for establishing an impact control plan. Seven test reports detail the work done at WSTF. As such, this document contributes to the database of information regarding COPV behavior that will ensure performance benefits and safety are maintained throughout vessel service life.
Risk Quantification of Systems Engineering Documents Improves Probability of DOD Project Success
2009-09-01
comprehensive risk model for DoD milestone review documentation as well as recommended changes to the Capability Maturity Model Integration ( CMMI ) Project...Milestone Documentation, Project Planning, Rational Frame, Political Frame, CMMI Project Planning Process Area, CMMI Risk Management Process Area...well as recommended changes to the Capability Maturity Model Integration ( CMMI ) Project Planning and Risk Management process areas. The intent is to
Decoupling the use and meaning of strategic plans in public healthcare
2013-01-01
Background The culture of New Public Management has promoted the diffusion of strategic management tools throughout Public Healthcare Organisations (PHOs). There is consensus that better strategic planning tools are required to achieve higher levels of organisational performance. This paper provides evidence and understanding of the emergent uses and scope of strategic planning in PHOs, in order to answer three research questions: (i) has the New Public Management approach changed the organisational culture of PHOs in terms of how they adopt, diffuse, and use strategic planning documents? (ii) how coherent are strategic planning documents in PHOs? and (iii) what are the main purposes of strategic documents in PHOs? Methods An analysis was carried out in three Italian Local Health Authorities. We analysed the number and types of formal strategic documents adopted between 2004 and 2012, evaluating their degree of coherence and coordination, their hierarchy, their degree of disclosure, and the consistency of their strategic goals. A content analysis was performed to investigate overlap in terms of content and focus, and a qualitative analysis was carried out to study and represent the relationships between documents. Results The analysis showed that a rich set of strategic documents were adopted by each PHO. However, these are often uncoordinated and overlap in terms of content. They adopt different language and formats for various stakeholders. The presence of diverse external drivers may explain the divergent focus, priorities and inconsistent goals in the strategic documents. This planning complexity makes it difficult to determine how the overall goals and mission of an organisation are defined and made visible. Conclusions The evidence suggests that PHOs use a considerable number of strategic documents. However, they employ no clear or explicit overarching strategy currently, and strategic planning appears to be externally oriented. All the documents communicate similar topics to different stakeholders, although they use different language to answer to the different expectations of each stakeholder. Therefore, strategic planning and plans seem to be driven by neo-institutional approaches, as they are means to build consensus and negotiate ground for strategic actions, rather than means to identify strategic choices and priorities. PMID:23289527
Decoupling the use and meaning of strategic plans in public healthcare.
Lega, Federico; Longo, Francesco; Rotolo, Andrea
2013-01-04
The culture of New Public Management has promoted the diffusion of strategic management tools throughout Public Healthcare Organisations (PHOs). There is consensus that better strategic planning tools are required to achieve higher levels of organisational performance. This paper provides evidence and understanding of the emergent uses and scope of strategic planning in PHOs, in order to answer three research questions: (i) has the New Public Management approach changed the organisational culture of PHOs in terms of how they adopt, diffuse, and use strategic planning documents? (ii) how coherent are strategic planning documents in PHOs? and (iii) what are the main purposes of strategic documents in PHOs? An analysis was carried out in three Italian Local Health Authorities. We analysed the number and types of formal strategic documents adopted between 2004 and 2012, evaluating their degree of coherence and coordination, their hierarchy, their degree of disclosure, and the consistency of their strategic goals. A content analysis was performed to investigate overlap in terms of content and focus, and a qualitative analysis was carried out to study and represent the relationships between documents. The analysis showed that a rich set of strategic documents were adopted by each PHO. However, these are often uncoordinated and overlap in terms of content. They adopt different language and formats for various stakeholders. The presence of diverse external drivers may explain the divergent focus, priorities and inconsistent goals in the strategic documents. This planning complexity makes it difficult to determine how the overall goals and mission of an organisation are defined and made visible. The evidence suggests that PHOs use a considerable number of strategic documents. However, they employ no clear or explicit overarching strategy currently, and strategic planning appears to be externally oriented. All the documents communicate similar topics to different stakeholders, although they use different language to answer to the different expectations of each stakeholder. Therefore, strategic planning and plans seem to be driven by neo-institutional approaches, as they are means to build consensus and negotiate ground for strategic actions, rather than means to identify strategic choices and priorities.
1988-09-01
S P a .E REPORT DOCUMENTATION PAGE OMR;oJ ’ , CRR Eo Dale n2 ;R6 ’a 4EPOR- SCRFT CASS F.C.T ON ’b RES’RICTI’,E MARKINGS Unclassified a ECRIT y...and selection of test waves 30. Measured prototype wave data on which a comprehensive statistical analysis of wave conditions could be based were...Tests Existing conditions 32. Prior to testing of the various improvement plans, comprehensive tests were conducted for existing conditions (Plate 1
GEOTAIL Spacecraft historical data report
NASA Technical Reports Server (NTRS)
Boersig, George R.; Kruse, Lawrence F.
1993-01-01
The purpose of this GEOTAIL Historical Report is to document ground processing operations information gathered on the GEOTAIL mission during processing activities at the Cape Canaveral Air Force Station (CCAFS). It is hoped that this report may aid management analysis, improve integration processing and forecasting of processing trends, and reduce real-time schedule changes. The GEOTAIL payload is the third Delta 2 Expendable Launch Vehicle (ELV) mission to document historical data. Comparisons of planned versus as-run schedule information are displayed. Information will generally fall into the following categories: (1) payload stay times (payload processing facility/hazardous processing facility/launch complex-17A); (2) payload processing times (planned, actual); (3) schedule delays; (4) integrated test times (experiments/launch vehicle); (5) unique customer support requirements; (6) modifications performed at facilities; (7) other appropriate information (Appendices A & B); and (8) lessons learned (reference Appendix C).
Numerical aerodynamic simulation program long haul communications prototype
NASA Technical Reports Server (NTRS)
Cmaylo, Bohden K.; Foo, Lee
1987-01-01
This document is a report of the Numerical Aerodynamic Simulation (NAS) Long Haul Communications Prototype (LHCP). It describes the accomplishments of the LHCP group, presents the results from all LHCP experiments and testing activities, makes recommendations for present and future LHCP activities, and evaluates the remote workstation accesses from Langley Research Center, Lewis Research Center, and Colorado State University to Ames Research Center. The report is the final effort of the Long Haul (Wideband) Communications Prototype Plan (PT-1133-02-N00), 3 October 1985, which defined the requirements for the development, test, and operation of the LHCP network and was the plan used to evaluate the remote user bandwidth requirements for the Numerical Aerodynamic Simulation Processing System Network.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bechtel Nevada
1998-09-30
This corrective action plan proposes the closure method for the area 9 unexploded Ordnance landfill, corrective action unit 453 located at the Tonopah Test Range. The area 9 UXO landfill consists of corrective action site no. 09-55-001-0952 and is comprised of three individual landfill cells designated as A9-1, A9-2, and A9-3. The three landfill cells received wastes from daily operations at area 9 and from range cleanups which were performed after weapons testing. Cell locations and contents were not well documented due to the unregulated disposal practices commonly associated with early landfill operations. However, site process knowledge indicates that themore » landfill cells were used for solid waste disposal, including disposal of UXO.« less
Test, Control and Monitor System maintenance plan
NASA Technical Reports Server (NTRS)
Buehler, David P.; Lougheed, M. J.
1993-01-01
The maintenance requirements for Test, Control, and Monitor System (TCMS) and the method for satisfying these requirements prior to First Need Date (FND) of the last TCMS set are described. The method for satisfying maintenance requirements following FND of the last TCMS set will be addressed by a revision to this plan. This maintenance plan serves as the basic planning document for maintenance of this equipment by the NASA Payloads Directorate (CM) and the Payload Ground Operations Contractor (PGOC) at KSC. The terms TCMS Operations and Maintenance (O&M), Payloads Logistics, TCMS Sustaining Engineering, Payload Communications, and Integrated Network Services refer to the appropriate NASA and PGOC organization. For the duration of their contract, the Core Electronic Contractor (CEC) will provide a Set Support Team (SST). One of the primary purposes of this team is to help NASA and PGOC operate and maintain TCMS. It is assumed that SST is an integral part of TCMS O&M. The purpose of this plan is to describe the maintenance concept for TCMS hardware and system software in order to facilitate activation, transition planning, and continuing operation. When software maintenance is mentioned in this plan, it refers to maintenance of TCMS system software.
Documenting historical data and accessing it on the World Wide Web
Malchus B. Baker; Daniel P. Huebner; Peter F. Ffolliott
2000-01-01
New computer technologies facilitate the storage, retrieval, and summarization of watershed-based data sets on the World Wide Web. These data sets are used by researchers when testing and validating predictive models, managers when planning and implementing watershed management practices, educators when learning about hydrologic processes, and decisionmakers when...
The Nebraska Blueprint for School Assessment Programs. Volume 2: Processes and Procedures.
ERIC Educational Resources Information Center
Kennedy, Dale
This is the second of three volumes designed to cover the problems and issues of developing and managing a school assessment program. The series offers guidelines and illustrations of several special aspects of assessment programs, such as administering tests and documenting their results. This volume deals with the planning of assessment…
Managers Handbook for Software Development
NASA Technical Reports Server (NTRS)
Agresti, W.; Mcgarry, F.; Card, D.; Page, J.; Church, V.; Werking, R.
1984-01-01
Methods and aids for the management of software development projects are presented. The recommendations are based on analyses and experiences with flight dynamics software development. The management aspects of organizing the project, producing a development plan, estimation costs, scheduling, staffing, preparing deliverable documents, using management tools, monitoring the project, conducting reviews, auditing, testing, and certifying are described.
75 FR 2517 - Notice of Solicitation for Estuary Habitat Restoration Program
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-15
... related to climate change on the viability of the proposed restoration. This may take the form of considering climate change in the planning, design, siting, and construction of the project, or in testing new restoration technologies that may help to alleviate effects of climate change. This document describes project...
Designing User Manuals for the Online Public Access Catalog.
ERIC Educational Resources Information Center
Seiden, Peggy; Sullivan, Patricia
1986-01-01
Describes the process of developing and revising a brochure to guide library patrons in conducting an author search on an online public access catalog in order to demonstrate the application of four steps in production of a functional document--analysis; planning; development; evaluation, testing, and revision. Three sources are given. (EJS)
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
2009-07-31
This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the 92-Acre Area, the southeast quadrant of the Radioactive Waste Management Site, located in Area 5 of the Nevada Test Site (NTS). The 92-Acre Area includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' Data Quality Objectives (DQOs) were developed for the 92-Acre Area, which includes CAU 111. The result of the DQO process was that the 92-Acre Area is sufficiently characterized to provide the input data necessary to evaluate corrective action alternatives (CAAs) without the collection of additional data. The DQOs are includedmore » as Appendix A of this document. This CADD/CAP identifies and provides the rationale for the recommended CAA for the 92-Acre Area, provides the plan for implementing the CAA, and details the post-closure plan. When approved, this CADD/CAP will supersede the existing Pit 3 (P03) Closure Plan, which was developed in accordance with Title 40 Code of Federal Regulations (CFR) Part 265, 'Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities.' This document will also serve as the Closure Plan and the Post-Closure Plan, which are required by 40 CFR 265, for the 92-Acre Area. After closure activities are complete, a request for the modification of the Resource Conservation and Recovery Act Permit that governs waste management activities at the NTS will be submitted to the Nevada Division of Environmental Protection to incorporate the requirements for post-closure monitoring. Four CAAs, ranging from No Further Action to Clean Closure, were evaluated for the 92-Acre Area. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of the data used to develop the conceptual site model; a review of past, current, and future operations at the site; and the detailed and comparative analysis of the potential CAAs, Closure in Place with Administrative Controls is the preferred CAA for the 92-Acre Area. Closure activities will include the following: (1) Constructing an engineered evapotranspiration cover over the 92-Acre Area; (2) Installing use restriction (UR) warning signs, concrete monuments, and subsidence survey monuments; (3) Establishing vegetation on the cover; (4) Implementing a UR; and (5) Implementing post-closure inspections and monitoring. The Closure in Place with Administrative Controls alternative meets all requirements for the technical components evaluated, fulfills all applicable federal and state regulations for closure of the site, and will minimize potential future exposure pathways to the buried waste at the site.« less
An Inventory of Documents on Educational Planning and Management in Asia and the Pacific.
ERIC Educational Resources Information Center
Mellor, Warren L., Ed.
This document comprises a UNESCO-sponsored inventory of documents on educational planning and management in Asia and the Pacific. The database consists of 714 documents from participating countries, divided into 10 subsections by country and indexed according to author and subject. The main entries are grouped alphabetically by country, as…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rutqvist, Jonny; Blanco Martin, Laura; Mukhopadhyay, Sumit
The modeling efforts in support of the field test planning conducted at LBNL leverage on recent developments of tools for modeling coupled thermal-hydrological-mechanical-chemical (THMC) processes in salt and their effect on brine migration at high temperatures. This work includes development related to, and implementation of, essential capabilities, as well as testing the model against relevant information and published experimental data related to the fate and transport of water. These are modeling capabilities that will be suitable for assisting in the design of field experiment, especially related to multiphase flow processes coupled with mechanical deformations, at high temperature. In this report,more » we first examine previous generic repository modeling results, focusing on the first 20 years to investigate the expected evolution of the different processes that could be monitored in a full-scale heater experiment, and then present new results from ongoing modeling of the Thermal Simulation for Drift Emplacement (TSDE) experiment, a heater experiment on the in-drift emplacement concept at the Asse Mine, Germany, and provide an update on the ongoing model developments for modeling brine migration. LBNL also supported field test planning activities via contributions to and technical review of framework documents and test plans, as well as participation in workshops associated with field test planning.« less
Santa Barbara City College: 1999-02 College Plan.
ERIC Educational Resources Information Center
Santa Barbara City Coll., CA.
This document presents Santa Barbara City College's 1999-2002 College Plan. It is intended to be used as the central organizing document for decision making, planning, and budgeting throughout the College during the 1999-2002 period. This plan is the result of thoughtful and substantive dialogue involving individuals and groups throughout the…
El Camino College Master Plan.
ERIC Educational Resources Information Center
El Camino Coll., Torrance, CA.
This document is the educational Master Plan for El Camino Community College District. The purpose of the plan is to develop a research-based document that will be used as a foundation for decisions regarding instructional programs, support services, staffing and facilities. It is intended to serve as the basic foundation for all other plans of…
DOT National Transportation Integrated Search
2001-10-01
This document is the third in a series of five that present the sequential results of the Thurston Regional Planning Council (TRPC) Regional Intelligent Transportation Systems (ITS) : Planning Project. This document presents an ITS Strategic Depl...
Airport Surface Traffic Control Visual Ground Aids Engineering and Development Plan
DOT National Transportation Integrated Search
1977-01-01
The plan described in this document supports the overall program at the Transportation Systems Center to define, design, develop, and evaluate systems that meet the requirements of airport surface traffic control. This plan is part of documentation s...
Brown, Alaina J; Shen, Megan Johnson; Urbauer, Diana; Taylor, Jolyn; Parker, Patricia A; Carmack, Cindy; Prescott, Lauren; Kolawole, Elizabeth; Rosemore, Carly; Sun, Charlotte; Ramondetta, Lois; Bodurka, Diane C
2016-09-01
The goals of this study were: (1) to evaluate patients' knowledge regarding advance directives and completion rates of advance directives among gynecologic oncology patients and (2) to examine the association between death anxiety, disease symptom burden, and patient initiation of advance directives. 110 gynecologic cancer patients were surveyed regarding their knowledge and completion of advance directives. Patients also completed the MD Anderson Symptom Inventory (MDASI) scale and Templer's Death Anxiety Scale (DAS). Descriptive statistics were utilized to examine characteristics of the sample. Fisher's exact tests and 2-sample t-tests were utilized to examine associations between key variables. Most patients were white (76.4%) and had ovarian (46.4%) or uterine cancer (34.6%). Nearly half (47.0%) had recurrent disease. The majority of patients had heard about advance directives (75%). Only 49% had completed a living will or medical power of attorney. Older patients and those with a higher level of education were more likely to have completed an advance directive (p<0.01). Higher MDASI Interference Score (higher symptom burden) was associated with patients being less likely to have a living will or medical power of attorney (p=0.003). Higher DAS score (increased death anxiety) was associated with patients being less likely to have completed a living will or medical power of attorney (p=0.03). Most patients were familiar with advance directives, but less than half had created these documents. Young age, lower level of education, disease-related interference with daily activities, and a higher level of death anxiety were associated with decreased rates of advance directive completion, indicating these may be barriers to advance care planning documentation. Young patients, less educated patients, patients with increased disease symptom burden, and patients with increased death anxiety should be targeted for advance care planning discussions as they may be less likely to engage in advance care planning. Copyright © 2016. Published by Elsevier Inc.
Brown, Alaina J.; Shen, Megan Johnson; Urbauer, Diana; Taylor, Jolyn; Parker, Patricia A.; Carmack, Cindy; Prescott, Lauren; Kowaloe, Elizabeth; Rosemore, Carly; Sun, Charlotte; Ramondetta, Lois; Bodurka, Diane C.
2017-01-01
Objectives The goals of this study were: (1) to evaluate patients’ knowledge regarding advance directives and completion rates of advance directives among gynecologic oncology patients and (2) to examine the association between death anxiety, disease symptom burden, and patient initiation of advance directives. Methods 110 gynecologic cancer patients were surveyed regarding their knowledge and completion of advance directives. Patients also completed the MD Anderson Symptom Inventory (MDASI) scale and Templer’s Death Anxiety Scale (DAS). Descriptive statistics were utilized to examine characteristics of the sample. Fisher’s exact tests and 2-sample t-tests were utilized to examine associations between key variables. Results Most patients were white (76.4%) and had ovarian (46.4%) or uterine cancer (34.6%). Nearly half (47.0%) had recurrent disease. The majority of patients had heard about advance directives (75%). Only 49% had completed a living will or medical power of attorney. Older patients and those with a higher level of education were more likely to have completed an advance directive (p<0.01). Higher MDASI Interference Score (higher symptom burden) was associated with patients being less likely to have a living will or medical power of attorney (p=0.003). Higher DAS score (increased death anxiety) was associated with patients being less likely to have completed a living will or medical power of attorney (p=0.03). Conclusion Most patients were familiar with advance directives, but less than half had created these documents. Young age, lower level of education, disease-related interference with daily activities, and a higher level of death anxiety were associated with decreased rates of advance directive completion, indicating these may be barriers to advance care planning documentation. Young patients, less educated patients, patients with increased disease symptom burden, and patients with increased death anxiety should be targeted for advance care planning discussions as they may be less likely to engage in advance care planning. PMID:27439968
NASA Technical Reports Server (NTRS)
2005-01-01
The purpose of this document is to identify the general flight/mission planning requirements for same-day file-and-fly access to the NAS for both civil and military High-Altitude Long Endurance (HALE) Unmanned Aircraft System (UAS). Currently the scope of this document is limited to Step 1, operations above flight level 43,000 feet (FL430). This document describes the current applicable mission planning requirements and procedures for both manned and unmanned aircraft and addresses HALE UAS flight planning considerations in the future National Airspace System (NAS). It also discusses the unique performance and operational capabilities of HALE UAS associated with the Access 5 Project, presents some of the projected performance characteristics and conceptual missions for future systems, and provides detailed analysis of the recommended mission planning elements for operating HALE UAS in the NAS.
Performance validation of the ANSER control laws for the F-18 HARV
NASA Technical Reports Server (NTRS)
Messina, Michael D.
1995-01-01
The ANSER control laws were implemented in Ada by NASA Dryden for flight test on the High Alpha Research Vehicle (HARV). The Ada implementation was tested in the hardware-in-the-loop (HIL) simulation, and results were compared to those obtained with the NASA Langley batch Fortran implementation of the control laws which are considered the 'truth model.' This report documents the performance validation test results between these implementations. This report contains the ANSER performance validation test plan, HIL versus batch time-history comparisons, simulation scripts used to generate checkcases, and detailed analysis of discrepancies discovered during testing.
Performance validation of the ANSER Control Laws for the F-18 HARV
NASA Technical Reports Server (NTRS)
Messina, Michael D.
1995-01-01
The ANSER control laws were implemented in Ada by NASA Dryden for flight test on the High Alpha Research Vehicle (HARV). The Ada implementation was tested in the hardware-in-the-loop (HIL) simulation, and results were compared to those obtained with the NASA Langley batch Fortran implementation of the control laws which are considered the 'truth model'. This report documents the performance validation test results between these implementations. This report contains the ANSER performance validation test plan, HIL versus batch time-history comparisons, simulation scripts used to generate checkcases, and detailed analysis of discrepancies discovered during testing.
Phase II test plan for the evaluation of the performance of container filling systems
DOE Office of Scientific and Technical Information (OSTI.GOV)
BOGER, R.M.
The PHMC will provide tank wastes for final treatment by BNFL from Hanford's waste tanks. Concerns about the ability for ''grab'' sampling to provide large volumes of representative waste samples has led to the development of a nested, fixed-depth sampling system. Preferred concepts for filling sample containers that meet RCRA organic sample criteria were identified by a PHMC Decision Board. These systems will replace the needle based sampling ''T'' that is currently on the sampling system. This test plan document identifies cold tests with simulants that will demonstrate the preferred bottle filling concepts abilities to provide representative waste samples andmore » will meet RCRA criteria. Additional tests are identified that evaluate the potential for cross-contamination between samples and the ability for the system to decontaminate surfaces which have contacted tank wastes. These tests will be performed with kaolid/water and sand/water slurry simulants in the test rig that was used by AEAT to complete Phase 1 tests in FY 1999.« less
Homb, Nicole M; Sheybani, Shayan; Derby, Dustin; Wood, Kurt
2014-10-01
Objective : The objective of this study was to investigate the association of a clinical documentation quality improvement program using audit-feedback with clinical compliance to indicators of quality chart documentation. Methods : This was an analysis of differences between adherence to quality indicators of chiropractic record documentation and audit-feedback intervention (feedback report only vs. feedback report with one-on-one educational consultation) at different campuses. Comparisons among groups were analyzed using analysis of variance (ANOVA), Tukey or Dunnett post hoc tests, and Cohen's d effect size estimates. Results : There was a significant increase in the mean percentile compliance in 2 of 5 compliance areas and 1 of 11 compliance objectives. Campus B demonstrated significantly higher levels of compliance relative to campus A and/or campus C in 5 of 5 compliance areas and 7 of 11 compliance objectives. Across-campus comparisons indicated that the compliance area Review (Non-Medicare) Treatment Plan [F(2,18) = 17.537, p < .001] and compliance objective Treatment Plan Goals [F(2,26) = 5.653, p < .001] exhibited the highest practical importance for clinical compliance practice. Conclusions : Feedback of performance improved compliance to indicators of quality health record documentation, especially when baseline adherence is relatively low. Required educational consultations with clinicians combined with audit-feedback were no more effective at increasing compliance to indicators of quality health record documentation than audit-feedback alone.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick K.
This Corrective Action Decision Document/Closure Report presents information supporting the closure of Corrective Action Unit (CAU) 550: Smoky Contamination Area, Nevada National Security Site, Nevada. CAU 550 includes 19 corrective action sites (CASs), which consist of one weapons-related atmospheric test (Smoky), three safety experiments (Ceres, Oberon, Titania), and 15 debris sites (Table ES-1). The CASs were sorted into the following study groups based on release potential and technical similarities: • Study Group 1, Atmospheric Test • Study Group 2, Safety Experiments • Study Group 3, Washes • Study Group 4, Debris The purpose of this document is to provide justificationmore » and documentation supporting the conclusion that no further corrective action is needed for CAU 550 based on implementation of the corrective actions listed in Table ES-1. Corrective action investigation (CAI) activities were performed between August 2012 and October 2013 as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 550: Smoky Contamination Area; and in accordance with the Soils Activity Quality Assurance Plan. The approach for the CAI was to investigate and make data quality objective (DQO) decisions based on the types of releases present. The purpose of the CAI was to fulfill data needs as defined during the DQO process. The CAU 550 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated the dataset is complete and acceptable for use in fulfilling the DQO data needs.« less
Final Report for X-ray Diffraction Sample Preparation Method Development
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ely, T. M.; Meznarich, H. K.; Valero, T.
WRPS-1500790, “X-ray Diffraction Saltcake Sample Preparation Method Development Plan/Procedure,” was originally prepared with the intent of improving the specimen preparation methodology used to generate saltcake specimens suitable for XRD-based solid phase characterization. At the time that this test plan document was originally developed, packed powder in cavity supports with collodion binder was the established XRD specimen preparation method. An alternate specimen preparation method less vulnerable, if not completely invulnerable to preferred orientation effects, was desired as a replacement for the method.
1989-04-01
and Safety Plan has been developed for the prevention of occupational injuries and illnesses during field activities at RMA. This plan addresses...totaltriThelomethanes radmiutm CD 10(1) 5 .13)* 10(4 Larbon tetrachloride CCL4 0(3)5.4 ’tordane CDN0.004(l) 0.00046(5) CLI3oride CL 250,000(l...numerous carcinogenicity tests in a variety of animals indicate that dieldrin promotes only liver tumors and the tumors develop only in mice. On the basis of
1981-08-01
This item of local $1,901,000______ on Ocoe 90prc ees .J$190,000 on October 1980 price levels. ..$9,00 on October 1980 price levels. 6 cooperation...physical model in October 1980 . Initial testing of the recommended alternative was then started in November 1980 . However, because the model study could not...Appendix C of the Plan of Study for this project. Both the completed Plan of Study and the Stage 2 Document, July 1979 (revised April 1980 ) for this
Creating a University for the 21st Century: Strategic Plan
ERIC Educational Resources Information Center
North Dakota University System, 2005
2005-01-01
This document presents the strategic plan of the North Dakota University System, revised in November 2005, to develop a common vision and clear set of expectations for higher education in North Dakota. The strategic plan for the University System is directly linked to the Roundtable on Higher Education plan. This document presents the ten sections…
Defense.gov Special Report: Government Shutdown - What You Need to Know
Department is taking to plan for a possible government shutdown. Document Plan for Agency Operations During agencies should plan for a potential shutdown. Document Guidance for Continuation of Operations in The Contingency Plan Guidance for Continuation of Essential Operations in the Absence of Available Appropriations
Solid waste information and tracking system server conversion project management plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
MAY, D.L.
1999-04-12
The Project Management Plan governing the conversion of Solid Waste Information and Tracking System (SWITS) to a client-server architecture. The Solid Waste Information and Tracking System Project Management Plan (PMP) describes the background, planning and management of the SWITS conversion. Requirements and specification documentation needed for the SWITS conversion will be released as supporting documents.
Becker, CoraLynn; Bjornson, Darrel C; Kuhle, Julie W
2004-01-01
To document drug therapy problems and their causes and assess pharmacist follow-up of patients with identified drug therapy problems. Cross-sectional analysis. Iowa. 160 pharmacists who submitted 754 pharmaceutical care plans in an effort to qualify for participation in the Iowa Pharmaceutical Case Management program. Care plans were assessed for drug therapy problems and causes and for documentation of pharmacist follow-up (actual, none, or intent to follow up). Pharmacists documented a wide variety of drug therapy problems and causes, including adverse drug reactions (20.1% of care plans), need for additional drug therapy (18.9%), lack of patient adherence to therapy (16.3%), incorrect medication being prescribed (14.1%), and drug dose too high (10.0%). Pharmacist follow-up with patients was not optimal, with 31% of care plans providing documentation of actual follow-up. Another 42.2% of plans indicated that the pharmacist intended to contact the patient for follow-up but either did not do so or did not record the intervention. No actual follow-up or intent to follow up was recorded in 26.8% of care plans. Pharmacists practicing in independent pharmacies followed up with patients more frequently than those in other settings (36.4% of care plans, compared with 22.7%, 23.2%, and 28.4% for chain, clinic, and franchise pharmacies). Pharmacists were more likely to follow up when the identified problem involved drug safety rather than effectiveness (36.2% versus 28.3% of care plans). Documentation of pharmacist follow-up with patients was less than optimal. In addition to identifying drug therapy problems and causes, pharmacists must complete the care continuum through documentation of patient monitoring and follow-up to transform the philosophy and vision of the pharmaceutical care concept into a practice of pharmacy recognized and rewarded by patients and payers.
Exploring Operational Test and Evaluation of Unmanned Aircraft Systems: A Qualitative Case Study
NASA Astrophysics Data System (ADS)
Saliceti, Jose A.
The purpose of this qualitative case study was to explore and identify strategies that may potentially remedy operational test and evaluation procedures used to evaluate Unmanned Aircraft Systems (UAS) technology. The sample for analysis consisted of organizations testing and evaluating UASs (e.g., U.S. Air Force, U.S. Navy, U.S. Army, U.S. Marine Corps, U.S. Coast Guard, and Customs Border Protection). A purposeful sampling technique was used to select 15 subject matter experts in the field of operational test and evaluation of UASs. A questionnaire was provided to participants to construct a descriptive and robust research. Analysis of responses revealed themes related to each research question. Findings revealed operational testers utilized requirements documents to extrapolate measures for testing UAS technology and develop critical operational issues. The requirements documents were (a) developed without the contribution of stakeholders and operational testers, (b) developed with vague or unrealistic measures, and (c) developed without a systematic method to derive requirements from mission tasks. Four approaches are recommended to develop testable operational requirements and assist operational testers: (a) use a mission task analysis tool to derive requirements for mission essential tasks for the system, (b) exercise collaboration among stakeholders and testers to ensure testable operational requirements based on mission tasks, (c) ensure testable measures are used in requirements documents, and (d) create a repository list of critical operational issues by mission areas. The preparation of operational test and evaluation processes for UAS technology is not uniform across testers. The processes in place are not standardized, thus test plan preparation and reporting are different among participants. A standard method to prepare and report UAS technology should be used when preparing and reporting on UAS technology. Using a systematic process, such as mission-based test design, resonated among participants as an analytical method to link UAS mission tasks and measures of performance to the capabilities of the system under test when developing operational test plans. Further research should examine system engineering designs for system requirements traceability matrix of mission tasks and subtasks while using an analysis tool that adequately evaluates UASs with an acceptable level of confidence in the results.
DOT National Transportation Integrated Search
1996-08-01
The purpose of this document is to provide trustees with general guidance to develop restoration plans under OPA that comply with NEPA's procedural requirements. The focus of this document is to more fully describe the processes and products required...
11 Foot Unitary Plan Tunnel Facility Optical Improvement Large Window Analysis
NASA Technical Reports Server (NTRS)
Hawke, Veronica M.
2015-01-01
The test section of the 11 by 11-foot Unitary Plan Transonic Wind Tunnel (11-foot UPWT) may receive an upgrade of larger optical windows on both the North and South sides. These new larger windows will provide better access for optical imaging of test article flow phenomena including surface and off body flow characteristics. The installation of these new larger windows will likely produce a change to the aerodynamic characteristics of the flow in the Test Section. In an effort understand the effect of this change, a computational model was employed to predict the flows through the slotted walls, in the test section and around the model before and after the tunnel modification. This report documents the solid CAD model that was created and the inviscid computational analysis that was completed as a preliminary estimate of the effect of the changes.
NASA Technical Reports Server (NTRS)
Ricks, Glen A.
1988-01-01
The assembly test article (ATA) consisted of two live loaded redesigned solid rocket motor (RSRM) segments which were assembled and disassembled to simulate the actual flight segment stacking process. The test assembly joint was flight RSRM design, which included the J-joint insulation design and metal capture feature. The ATA test was performed mid-November through 24 December 1987, at Kennedy Space Center (KSC), Florida. The purpose of the test was: certification that vertical RSRM segment mating and separation could be accomplished without any damage; verification and modification of the procedures in the segment stacking/destacking documents; and certification of various GSE to be used for flight assembly and inspection. The RSRM vertical segment assembly/disassembly is possible without any damage to the insulation, metal parts, or seals. The insulation J-joint contact area was very close to the predicted values. Numerous deviations and changes to the planning documents were made to ensure the flight segments are effectively and correctly stacked. Various GSE were also certified for use on flight segments, and are discussed in detail.
Data management and processing plan, Department of Applied Geodesy
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-08-01
This plan outlines Data Management and Data Processing requirements of the Department of Applied Geodesy (DAG) and presents the plan to meet these requirements (These requirements are derived from the functional needs of the Department to meet the SSCL alignment tolerances and schedules). In addition, this document presents a schedule for the implementation of this plan. This document is an integral part of the Alignment Plan of the SSCL.
RELAP-7 Software Verification and Validation Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Smith, Curtis L.; Choi, Yong-Joon; Zou, Ling
This INL plan comprehensively describes the software for RELAP-7 and documents the software, interface, and software design requirements for the application. The plan also describes the testing-based software verification and validation (SV&V) process—a set of specially designed software models used to test RELAP-7. The RELAP-7 (Reactor Excursion and Leak Analysis Program) code is a nuclear reactor system safety analysis code being developed at Idaho National Laboratory (INL). The code is based on the INL’s modern scientific software development framework – MOOSE (Multi-Physics Object-Oriented Simulation Environment). The overall design goal of RELAP-7 is to take advantage of the previous thirty yearsmore » of advancements in computer architecture, software design, numerical integration methods, and physical models. The end result will be a reactor systems analysis capability that retains and improves upon RELAP5’s capability and extends the analysis capability for all reactor system simulation scenarios.« less
The Clintons stump for health care reform plan as details slowly emerge.
1993-10-05
In September 1993, in the US, Hillary Rodham Clinton, testified before 5 key congressional committees on President Clinton's plan to reform health care. Most of the money needed to finance the plan would come from elimination of waste in the current system. The administration has not yet formally sent the proposal to Congress. Family planning services are part of the proposed mandated benefit package, but the draft document does not provide details on family planning coverage while it discusses other mandated services in detail. Further, the draft document mentions neither family planning supplies (e.g., pills, IUDs, or diaphragms) nor whether family planning services will be considered preventive care, thereby exempting them from copayments or deductibles. It specifies prenatal care, periodic examinations, and screening test for children and adults (e.g., well-baby care and immunizations) as preventive services. The plan covers pregnancy-related care, but, other than exclusion of in vitro fertilization, this is not defined. The plan has a conscientious exemption option, but it is not clear as to whether the administration plans to continue the standing policy granting conscientious exemption to individuals and medical facilities or to expand it to include entire health plans. The administration emphasizes that, even though the plan covers abortion. The Health Insurance Association of America opposes the plan while the American Medical Association (AMA) neither supports nor opposes it. The AMA does object, however, to the plans provisions on malpractice and limits on annual premium increases. Families USA strongly favors the plan. The Congressional Caucus on Women's Issues asks the President to include all reproductive health services. The National Black Women's Health Project appreciates the Administration's commitment and the plan's coverage of preventive care and reproductive health, but stresses that it must improve access to poor women, most of whom are black.
Development of a Software Tool to Automate ADCO Flight Controller Console Planning Tasks
NASA Technical Reports Server (NTRS)
Anderson, Mark G.
2011-01-01
This independent study project covers the development of the International Space Station (ISS) Attitude Determination and Control Officer (ADCO) Planning Exchange APEX Tool. The primary goal of the tool is to streamline existing manual and time-intensive planning tools into a more automated, user-friendly application that interfaces with existing products and allows the ADCO to produce accurate products and timelines more effectively. This paper will survey the current ISS attitude planning process and its associated requirements, goals, documentation and software tools and how a software tool could simplify and automate many of the planning actions which occur at the ADCO console. The project will be covered from inception through the initial prototype delivery in November 2011 and will include development of design requirements and software as well as design verification and testing.
Crawler Acquisition and Testing Demonstration Project Management Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
DEFIGH-PRICE, C.
2000-10-23
If the crawler based retrieval system is selected, this project management plan identifies the path forward for acquiring a crawler/track pump waste retrieval system, and completing sufficient testing to support deploying the crawler for as part of a retrieval technology demonstration for Tank 241-C-104. In the balance of the document, these activities will be referred to as the Crawler Acquisition and Testing Demonstration. During recent Tri-Party Agreement negotiations, TPA milestones were proposed for a sludge/hard heel waste retrieval demonstration in tank C-104. Specifically one of the proposed milestones requires completion of a cold demonstration of sufficient scale to support finalmore » design and testing of the equipment (M-45-03G) by 6/30/2004. A crawler-based retrieval system was one of the two options evaluated during the pre-conceptual engineering for C-104 retrieval (RPP-6843 Rev. 0). The alternative technology procurement initiated by the Hanford Tanks Initiative (HTI) project, combined with the pre-conceptual engineering for C-104 retrieval provide an opportunity to achieve compliance with the proposed TPA milestone M-45-03H. This Crawler Acquisition and Testing Demonstration project management plan identifies the plans, organizational interfaces and responsibilities, management control systems, reporting systems, timeline and requirements for the acquisition and testing of the crawler based retrieval system. This project management plan is complimentary to and supportive of the Project Management Plan for Retrieval of C-104 (RPP-6557). This project management plan focuses on utilizing and completing the efforts initiated under the Hanford Tanks Initiative (HTI) to acquire and cold test a commercial crawler based retrieval system. The crawler-based retrieval system will be purchased on a schedule to support design of the waste retrieval from tank C-104 (project W-523) and to meet the requirement of proposed TPA milestone M-45-03H. This Crawler Acquisition and Testing Demonstration project management plan includes the following: (1) Identification of acquisition strategy and plan to obtain a crawler based retrieval system; (2) Plan for sufficient cold testing to make a decision for W-523 and to comply with TPA Milestone M-45-03H; (3) Cost and schedule for path forward; (4) Responsibilities of the participants; and (5) The plan is supported by updated Level 1 logics, a Relative Order of Magnitude cost estimate and preliminary project schedule.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Silvas, A. J.
The purpose of this Post-Closure Strategy is to provide a consistent methodology for continual evaluation of post-closure requirements for use-restricted areas on the Nevada National Security Site (NNSS), Nevada Test and Training Range (NTTR), and Tonopah Test Range (TTR) to consolidate, modify, or streamline the program. In addition, this document stipulates the creation of a single consolidated Post-Closure Plan that will detail the current post-closure requirements for all active use restrictions (URs) and outlines its implementation and subsequent revision. This strategy will ensure effective management and control of the post-closure sites. There are currently over 200 URs located on themore » NNSS, NTTR, and TTR. Post-closure requirements were initially established in the Closure Report for each site. In some cases, changes to the post-closure requirements have been implemented through addenda, errata sheets, records of technical change, or letters. Post-closure requirements have been collected from these multiple sources and consolidated into several formats, such as summaries and databases. This structure increases the possibility of inconsistencies and uncertainty. As more URs are established and the post-closure program is expanded, the need for a comprehensive approach for managing the program will increase. Not only should the current requirements be obtainable from a single source that supersedes all previous requirements, but the strategy for modifying the requirements should be standardized. This will enable more effective management of the program into the future. This strategy document and the subsequent comprehensive plan are to be implemented under the assumption that the NNSS and outlying sites will be under the purview of the U.S. Department of Energy, National Nuclear Security Administration for the foreseeable future. This strategy was also developed assuming that regulatory control of the sites remains static. The comprehensive plan is not intended to be a permanent long-term stewardship plan. However, it is intended to clarify requirements and identify components to effectively manage the sites until regulatory requirements are met or management of the site changes. The Environmental Management Program is required to manage these sites until the NNSS Environmental Restoration program is completed, currently planned for 2030. Prior to completion of the Environmental Restoration program, additional planning will be conducted to ensure that long-term stewardship of the sites is maintained. A comprehensive post-closure plan can be transitioned effectively into any future site-wide long-term stewardship program that may be developed. Therefore, the post-closure plan will include current aspects of the post-closure program that are also important aspects of long-term stewardship, including the following: • Management of physical and engineering controls such as fences, signs, and soil covers • Management of institutional and administrative controls such as use restrictions and real estate systems • Management of monitoring and maintenance programs • Management of information related to the sites such as geographic information system data and related documentation The strategy will also allow for periodic review and modification of any aspect of the program to ensure continued effectiveness.« less
Defense switched network technology and experiments program
NASA Astrophysics Data System (ADS)
Weinstein, C. J.
1983-09-01
This report documents work performed during FY 1983 on the DCA-sponsored Defense Switched Network Technology and Experiments Program. The areas of work reported are: (1) development of routing algorithms for application in the Defense Switched Network (DSN); (2) instrumentation and integration of the Experimental Integrated Switched Network (EISN) test facility; (3) development and test of data communication techniques using DoD-standard data protocols in an integrated voice/data network; and (4) EISN system coordination and experiment planning.
Preschool Teachers' Perspectives on Planning and Documentation in Preschool
ERIC Educational Resources Information Center
Alvestad, Torgeir; Sheridan, Sonja
2015-01-01
This article is based on a research project focusing on Norwegian teachers' planning and documentation of children's learning in preschool. Norwegian preschools follow a national curriculum and teachers are obliged to document both professional practice and learning outcomes. The aim of the article is to investigate teachers' experiences of…
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-07-01
This document contains comments made by the US Nuclear Regulatory Commission upon their review of the Long-Term Surveillance Plan for the Bodo Canyon Disposal Site, Durango, Colorado. Responses to the comments are also included in the document.
What is the Final Verification of Engineering Requirements?
NASA Technical Reports Server (NTRS)
Poole, Eric
2010-01-01
This slide presentation reviews the process of development through the final verification of engineering requirements. The definition of the requirements is driven by basic needs, and should be reviewed by both the supplier and the customer. All involved need to agree upon a formal requirements including changes to the original requirements document. After the requirements have ben developed, the engineering team begins to design the system. The final design is reviewed by other organizations. The final operational system must satisfy the original requirements, though many verifications should be performed during the process. The verification methods that are used are test, inspection, analysis and demonstration. The plan for verification should be created once the system requirements are documented. The plan should include assurances that every requirement is formally verified, that the methods and the responsible organizations are specified, and that the plan is reviewed by all parties. The options of having the engineering team involved in all phases of the development as opposed to having some other organization continue the process once the design has been complete is discussed.
ERIC Educational Resources Information Center
Yuzdepski, I., Comp.; Elliott, L., Comp.
This document presents information, in the form of summary sheets, on 54 teacher evaluation instruments. Each summary contains pertinent information about the instrument regarding publishing company, author, criteria evaluated, subject of observation, category dimension, and coding units. The 19 criteria used in the evaluation tests, which were…
Individualized Child-Focused Curriculum: A Differentiated Approach
ERIC Educational Resources Information Center
Gronlund, Gaye
2016-01-01
How do you focus on each individual child in a full classroom? Learn to integrate individualized curriculum into daily practice with this step-by-step guide. Even good observers and documenters do not always use these insights to inform their curriculum planning. Using Developmental Studies, a new tool created and successfully field-tested by…
Classroom Materials for Teaching "The Particle Nature of Matter." Practical Paper No. 173.
ERIC Educational Resources Information Center
Pella, Milton O.; And Others
This document presents the lesson plans and tests used in the research study reported in Technical Report 173 (ED 070 658), together with descriptions of models and films developed for the teaching program. Thirty-one lessons are included, covering the topics of matter and energy; making interferences; particles; a model for matter; particles and…
Potential Alternatives Report for Validation of Alternatives to Aliphatic Isocyanate Polyurethanes
NASA Technical Reports Server (NTRS)
Lewis, pattie
2011-01-01
Identifying and selecting alternative materials and technologies that have the potential to reduce the identified HazMats and hazardous air pollutants (HAPs), while incorporating sound corrosion prevention and control technologies, is a complicated task due to the fast pace at which new technologies emerge and rules change. The alternatives are identified through literature searches, electronic database and Internet searches, surveys, and/or personal and professional contacts. Available test data was then compiled on the proposed alternatives to determine if the materials meet the test objectives or if further)laboratory or field-testing will be required. After reviewing technical information documented in the PAR, government representatives, technical representatives from the affected facilities, and other stakeholders involved in the process will select the list of viable alternative coatings for consideration and testing under the project's Joint Test Protocol entitled Joint Test Protocol for Validation of Alternatives to Aliphatic Isocyanate Polyurethanes and Field Test Plan entitled Field Evaluations Test Plan for Validation of Alternatives to Aliphatic Isocyanate Polyurethanes, both prepared by ITB. Test results will be reported in a Joint Test Report upon completion oftesting. The selection rationale and conclusions are documented in this PAR. A cost benefit analysis will be prepared to quantify the estimated capital and process costs of coating alternatives and cost savings relative to the current coating processes, however, some initial cost data has been included in this PAR. For this coatings project, isocyanates, as found in aliphatic isocyanate polyurethanes, were identified as the target HazMat to be eliminated. Table 1-1 lists the target HazMats, the related process and application, current specifications, and affected programs.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gilliam, T.M.
1991-05-01
This Project Quality Assurance Plan (PQAP) sets forth the quality assurance (QA) requirements that are applied to those elements of the Westinghouse Materials Company of Ohio (WMCO) Operable Unit 1 support at Oak Ridge National Laboratory (ORNL) project that involve research and development (R D) performed at ORNL. This is in compliance with the applicable criteria of 10 CFR Part 50, Appendix B, ANSI/ASME NQA-1, as specified by Department of Energy (DOE) Oak Ridge Operations (ORO) Order 5700.6B. For this application, NQA-1 is the core QA Program requirements document. QA policy, normally found in the requirements document, is contained herein.more » The requirements of this PQAP apply to project activities that affect the quality and reliability/credibility of research, development, and investigative data and documentation. These activities include the functions of attaining quality objectives and assuring that an appropriate QA program scope is established. The scope of activities affecting quality includes organization; personnel training and qualifications; design control; procurement; material handling and storage; operating procedures; testing, surveillance, and auditing; R D investigative activities and documentation; deficiencies; corrective actions; and QA record keeping. 12 figs.« less
Technical Evaluation Motor No. 7 (TEM-7)
NASA Technical Reports Server (NTRS)
Hughes, Phil
1991-01-01
The Technical Evaluation Motor No. 7 (TEM-7) test was a full-scale, full duration static test firing of a high performance motor-configuration solid rocket motor with nozzle vectoring. The final test report documents the procedures, performance, and results of the static test firing of TEM-7. All observations, discussions, conclusions, and recommendations included in the report are complete and final except for the TEM-7 fixed housing unbond investigation. A presentation and discussion of TEM-7 performance, anomalies, and test result concurrence with the objectives outlined in CTP-0107, Rev A, Space Shuttle Technical Evaluation Motor No. 7 (TEM-7) Static Fire Test Plan are included.
Draft Updates to the Planning for Natural Disaster Debris Guidance and to Related Documents
EPA is requesting comment on the draft update of the Planning for Natural Disaster Debris Guidance, along with two other documents. This Guidance is an update of the Planning for Natural Disaster Debris guidance that EPA published in March 2008.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Standardization Information System (ASSIST), and Plans, Drawings, and Other Pertinent Documents. Availability of... Information System (ASSIST), and Plans, Drawings, and Other Pertinent Documents. Availability of... Streamlining and Standardization Information System (ASSIST), and Plans, Drawings, and Other Pertinent...
Pretest Caluculations of Temperature Changes for Field Thermal Conductivity Tests
DOE Office of Scientific and Technical Information (OSTI.GOV)
N.S. Brodsky
A large volume fraction of the potential monitored geologic repository at Yucca Mountain may reside in the Tptpll (Tertiary, Paintbrush Group, Topopah Spring Tuff, crystal poor, lower lithophysal) lithostratigraphic unit. This unit is characterized by voids, or lithophysae, which range in size from centimeters to meters. A series of thermal conductivity field tests are planned in the Enhanced Characterization of the Repository Block (ECRB) Cross Drift. The objective of the pretest calculation described in this document is to predict changes in temperatures in the surrounding rock for these tests for a given heater power and a set of thermal transportmore » properties. The calculation can be extended, as described in this document, to obtain thermal conductivity, thermal capacitance (density x heat capacity, J {center_dot} m{sup -3} {center_dot} K{sup -1}), and thermal diffusivity from the field data. The work has been conducted under the ''Technical Work Plan For: Testing and Monitoring'' (BSC 2001). One of the outcomes of this analysis is to determine the initial output of the heater. This heater output must be sufficiently high that it will provide results in a reasonably short period of time (within several weeks or a month) and be sufficiently high that the heat increase is detectable by the instruments employed in the test. The test will be conducted in stages and heater output will be step increased as the test progresses. If the initial temperature is set too high, the experiment will not have as many steps and thus fewer thermal conductivity data points will result.« less
Conceptual definition of a technology development mission for advanced solar dynamic power systems
NASA Technical Reports Server (NTRS)
Migra, R. P.
1986-01-01
An initial conceptual definition of a technology development mission for advanced solar dynamic power systems is provided, utilizing a space station to provide a dedicated test facility. The advanced power systems considered included Brayton, Stirling, and liquid metal Rankine systems operating in the temperature range of 1040 to 1400 K. The critical technologies for advanced systems were identified by reviewing the current state of the art of solar dynamic power systems. The experimental requirements were determined by planning a system test of a 20 kWe solar dynamic power system on the space station test facility. These requirements were documented via the Mission Requirements Working Group (MRWG) and Technology Development Advocacy Group (TDAG) forms. Various concepts or considerations of advanced concepts are discussed. A preliminary evolutionary plan for this technology development mission was prepared.
Power Analysis Tutorial for Experimental Design Software
2014-11-01
I N S T I T U T E F O R D E F E N S E A N A L Y S E S IDA Document D-5205 November 2014 Power Analysis Tutorial for Experimental Design Software...16) [Jun 2013]. I N S T I T U T E F O R D E F E N S E A N A L Y S E S IDA Document D-5205 Power Analysis Tutorial for Experimental Design ...Test and Evaluation (T&E) community is increasing its employment of Design of Experiments (DOE), a rigorous methodology for planning and evaluating
XML technology planning database : lessons learned
NASA Technical Reports Server (NTRS)
Some, Raphael R.; Neff, Jon M.
2005-01-01
A hierarchical Extensible Markup Language(XML) database called XCALIBR (XML Analysis LIBRary) has been developed by Millennium Program to assist in technology investment (ROI) analysis and technology Language Capability the New return on portfolio optimization. The database contains mission requirements and technology capabilities, which are related by use of an XML dictionary. The XML dictionary codifies a standardized taxonomy for space missions, systems, subsystems and technologies. In addition to being used for ROI analysis, the database is being examined for use in project planning, tracking and documentation. During the past year, the database has moved from development into alpha testing. This paper describes the lessons learned during construction and testing of the prototype database and the motivation for moving from an XML taxonomy to a standard XML-based ontology.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
2014-05-01
Corrective Action Unit (CAU) 573 is located in Area 5 of the Nevada National Security Site, which is approximately 65 miles northwest of Las Vegas, Nevada. CAU 573 is a grouping of sites where there has been a suspected release of contamination associated with non-nuclear experiments and nuclear testing. This document describes the planned investigation of CAU 573, which comprises the following corrective action sites (CASs): • 05-23-02, GMX Alpha Contaminated Area • 05-45-01, Atmospheric Test Site - Hamilton These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate andmore » recommend corrective action alternatives.« less
Repository-based software engineering program: Concept document
NASA Technical Reports Server (NTRS)
1992-01-01
This document provides the context for Repository-Based Software Engineering's (RBSE's) evolving functional and operational product requirements, and it is the parent document for development of detailed technical and management plans. When furnished, requirements documents will serve as the governing RBSE product specification. The RBSE Program Management Plan will define resources, schedules, and technical and organizational approaches to fulfilling the goals and objectives of this concept. The purpose of this document is to provide a concise overview of RBSE, describe the rationale for the RBSE Program, and define a clear, common vision for RBSE team members and customers. The document also provides the foundation for developing RBSE user and system requirements and a corresponding Program Management Plan. The concept is used to express the program mission to RBSE users and managers and to provide an exhibit for community review.
The Cancer Nanotechnology Plan serves as a strategic document to the NCI Alliance for Nanotechnology in Cancer as well as a guiding document to the cancer nanotechnology and oncology fields, as a whole.
MO-F-CAMPUS-T-03: Continuous Dose Delivery with Gamma Knife Perfexion
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ghobadi,; Li, W; Chung, C
2015-06-15
Purpose: We propose continuous dose delivery techniques for stereotactic treatments delivered by Gamma Knife Perfexion using inverse treatment planning system that can be applied to various tumour sites in the brain. We test the accuracy of the plans on Perfexion’s planning system (GammaPlan) to ensure the obtained plans are viable. This approach introduces continuous dose delivery for Perefxion, as opposed to the currently employed step-and-shoot approaches, for different tumour sites. Additionally, this is the first realization of automated inverse planning on GammaPlan. Methods: The inverse planning approach is divided into two steps of identifying a quality path inside the target,more » and finding the best collimator composition for the path. To find a path, we select strategic regions inside the target volume and find a path that visits each region exactly once. This path is then passed to a mathematical model which finds the best combination of collimators and their durations. The mathematical model minimizes the dose spillage to the surrounding tissues while ensuring the prescribed dose is delivered to the target(s). Organs-at-risk and their corresponding allowable doses can also be added to the model to protect adjacent organs. Results: We test this approach on various tumour sizes and sites. The quality of the obtained treatment plans are comparable or better than forward plans and inverse plans that use step- and-shoot technique. The conformity indices in the obtained continuous dose delivery plans are similar to those of forward plans while the beam-on time is improved on average (see Table 1 in supporting document). Conclusion: We employ inverse planning for continuous dose delivery in Perfexion for brain tumours. The quality of the obtained plans is similar to forward and inverse plans that use conventional step-and-shoot technique. We tested the inverse plans on GammaPlan to verify clinical relevance. This research was partially supported by Elekta, Sweden (vendor of Gamma Knife Perfexion)« less
NASA Technical Reports Server (NTRS)
Greenberg, H. S.
1994-01-01
This document is the detailed test plan for the series of tests enumerated in the preceding section. The purpose of this plan is to present the test objectives, test parameters and procedures, expected performance and data analysis plans, criteria for success, test schedules, and related safety provisions and to describe the test articles, test instrumentation, and test facility requirements. Initial testing will be performed to screen four composite materials for suitability for SSTO LH2 tank loads and environmental conditions. The laminates for this testing will be fabricated by fiber placement, which is the manufacturing approach identified as baseline for the tank wall. Even though hand layup will be involved in fabricating many of the internal structural members of the tank, no hand-layup laminates will be evaluated in the screening or subsequent characterization testing. This decision is based on the understanding that mechanical properties measured for hand-layup material should be at least equivalent to properties measured for fiber-placed material, so that the latter should provide no less than a conservative approximation of the former. A single material will be downselected from these screening tests. This material will be subsequently characterized for impact-damage tolerance and durability under conditions of mechanical and thermal cycling, and to establish a preliminary design database to support ongoing analysis. Next, testing will be performed on critical structural elements fabricated from the selected material. Finally, the 8-foot diameter tank article, containing the critical structural features of the full-scale tank, will be fabricated by fiber placement and tested to verify its structural integrity and LH2 containment.
78 FR 14556 - Proposed Information Collection Activity; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-06
... for ACF. OMB No.: 0992-0005. Description: The Advance Planning Document (APD) process, established in... Biennial Reports 54 1 1.50 81 Advance Planning Document 34 1.2 120 4,896 Operational Advance Planning... for the proper performance of the functions of the agency, including whether the information shall...
Missouri Comprehensive Outdoor Recreation Plan: Executive Summary.
ERIC Educational Resources Information Center
Missouri State Inter-Agency for Outdoor Recreation, Jefferson.
The document is a summary of the Missouri State Comprehensive Outdoor Recreation Plan, which was designed to provide guidelines for allocation of resources for needed recreation facilities. The plan identifies the present and future needs for outdoor recreation and recommends ways of meeting these needs. This 1967 document provides a brief history…
42 CFR 495.324 - Prior approval conditions.
Code of Federal Regulations, 2010 CFR
2010-10-01
...: (1) The HIT advance planning document and the implementation advance planning document. (2) A request... $100,000 or contract time extensions of more than 60 days. (4) The State Medicaid HIT plan. (c) Failure...-competitively from a nongovernmental source HIT equipment or services, with proposed FFP under this subpart if...
EPA is requesting comment on the draft Planning for Natural Disaster Debris Guidance, and two other documents. The Guidance is an update of the Planning for Natural Disaster Debris guidance that EPA published in March 2008.
Guidance and Control Software Project Data - Volume 1: Planning Documents
NASA Technical Reports Server (NTRS)
Hayhurst, Kelly J. (Editor)
2008-01-01
The Guidance and Control Software (GCS) project was the last in a series of software reliability studies conducted at Langley Research Center between 1977 and 1994. The technical results of the GCS project were recorded after the experiment was completed. Some of the support documentation produced as part of the experiment, however, is serving an unexpected role far beyond its original project context. Some of the software used as part of the GCS project was developed to conform to the RTCA/DO-178B software standard, "Software Considerations in Airborne Systems and Equipment Certification," used in the civil aviation industry. That standard requires extensive documentation throughout the software development life cycle, including plans, software requirements, design and source code, verification cases and results, and configuration management and quality control data. The project documentation that includes this information is open for public scrutiny without the legal or safety implications associated with comparable data from an avionics manufacturer. This public availability has afforded an opportunity to use the GCS project documents for DO-178B training. This report provides a brief overview of the GCS project, describes the 4-volume set of documents and the role they are playing in training, and includes the planning documents from the GCS project. Volume 1 contains five appendices: A. Plan for Software Aspects of Certification for the Guidance and Control Software Project; B. Software Development Standards for the Guidance and Control Software Project; C. Software Verification Plan for the Guidance and Control Software Project; D. Software Configuration Management Plan for the Guidance and Control Software Project; and E. Software Quality Assurance Activities.
Wave Energy Prize - 1/50th Testing - Float Inc
Wesley Scharmen
2016-01-15
This submission of data includes all the 1/50th scale testing data completed on the Wave Energy Prize for Float Inc. During the testing of its 1/50th-scale device, Float Inc. Berger ABAM was deemed ineligible due to the fact that they brought a device with them to test and did not ship the device by the deadline stipulated in the Wave Energy Prize Rules. Because of this, analysis, results, and judging were not completed for this team/device. This submission included files such as: 1/50th test data (raw & processed) 1/50th test data video and pictures 1/50th Test plans and testing documents
Planning documents: a business planning strategy.
Kaehrle, P A
2000-06-01
Strategic planning and business plan development are essential nursing management skills in today's competitive, fast paced, continually changing health care environment. Even in times of great uncertainty, nurse managers need to plan and forecast for the future. A well-written business plan allows nurse managers to communicate their expertise and proactively contribute to the programmatic decisions and changes occurring within their patient population or service area. This article presents the use of planning documents as a practical, strategic business planning strategy. Although the model addresses orthopedic services specifically, nurse managers can gain an understanding and working knowledge of planning concepts that can be applied to all patient populations.
a Case Study in Documentation Production as Learning Tools Benefitting Multiple Stakeholders
NASA Astrophysics Data System (ADS)
Truesdale, T. J.; Hierlihy, B.; Jouan, P.
2017-08-01
The Fondation Strutt Foundation has taken on the conservation planning of the Strutt House as part of a P3 collaborative effort with the National Capital Commission (NCC). This paper will address three of the primary documents/data sets (documentary methodologies) being used on/for the Strutt House project. The Strutt House is a Recognized Federal Heritage Building and a significant example of Canadian modernist architecture. Stakeholder is a term often used in Architectural Projects reflecting an economic interest in success of the project. In conservation projects the stakeholder generally reflects social, cultural and/or economic interests in a given project. The Strutt House project has benefitted from stakeholders that have all been interested in the above, as well as the education of our future conservationists. The Strutt house was purchased from the architect's daughter in 2010, and as part of the acquisition, a Heritage Structure Report was commissioned and produced by PTAH Consultants Inc., Architects. The report forms the first of the primary referenced documents of this paper, including: a comprehensive photographic record of existing conditions; and, a building simulation model of the house `as designed/built'. This HSR and the accompanying data/documents have been adopted as the basis of an evolving document in the development of the Conservation Plan including: additional heritage surveys and technologies; traditional drawings, photographic and video records; and, a series of workshops on the structural stabilization efforts, thermography scans, and smoke/blow-door (air pressure) testing. In 2016, Pierre Jouan, a Master's thesis student from KU Leuvan, working with the Carleton University CIMS lab under the direction of Professor Mario Santana, and the FSF completed a 3-D scanning and photogrammetry workshop on the Strutt House and created a building information model (BIM model) from the collected data. The three primary documentation processes being addressed in this paper are really a series of directed research or focussed investigations resulting in a collection of data sets resolved -or combined- into a document. They will assist in the development of the long-term Programming and Conservation Management Plan of the Strutt House.
2015-11-01
collected. We determined that the methodologies were valid and the data were reliable for our purposes. In addition, we interviewed DOD officials and...of contracts and cost of labor involved in preparing program documentation, to arrive at the estimates for savings. To validate the data used in the...studies to be reasonable, and the data were sufficiently reliable for our purposes. We interviewed officials from DOD and 5 of the 12 Test Program
EMPTAC (Electromagnetic Pulse Test Aircraft) User’s Guide.
1988-04-01
8217Jhe 5 JJ 5 1.2 OBJECTIVES - Elf , The objectives of this document are to: 0 Point out major areas of interest which a user must consider while planning...to bridge the gap between the research and development (R&D) and the operational communities . It provides a vehicle to demonstrate and correlate the...digital communication from the ALT. The test responses are processed through the signal conditioners of the ALT and routed to the ALR. From the ALR
Rocketdyne Safety Algorithm: Space Shuttle Main Engine Fault Detection
NASA Technical Reports Server (NTRS)
Norman, Arnold M., Jr.
1994-01-01
The Rocketdyne Safety Algorithm (RSA) has been developed to the point of use on the TTBE at MSFC on Task 4 of LeRC contract NAS3-25884. This document contains a description of the work performed, the results of the nominal test of the major anomaly test cases and a table of the resulting cutoff times, a plot of the RSA value vs. time for each anomaly case, a logic flow description of the algorithm, the algorithm code, and a development plan for future efforts.
Energy Efficiency/Renewable Energy Programs in State Implementation Plans - Guidance Documents
final document that provides guidance to States and local areas on quantifying and including emission reductions from energy efficiency and renewable energy measures in State Implementation Plans (SIPS).
NASA Technical Reports Server (NTRS)
Nichol, Janet; King, Bruce; Xiaoli, Ding; Dowman, Ian; Quattrochi, Dale; Ehlers, Manfred
2007-01-01
A policy document on earth observation for urban planning and management resulting from a workshop held in Hong Kong in November 2006 is presented. The aim of the workshop was to provide a forum for researchers and scientists specializing in earth observation to interact with practitioners working in different aspects of city planning, in a complex and dynamic city, Hong Kong. A summary of the current state of the art, limitations, and recommendations for the use of earth observation in urban areas is presented here as a policy document.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chancellor, Christopher John
2016-11-14
The Los Alamos National Laboratory–Carlsbad Operations (LANL-CO) office was tasked by the DOE CBFO, Office of the Manager to perform a review of the acceptable knowledge (AK) to identify the oxidizers and sorbents in transuranic (TRU) waste streams, to conduct scoping studies on the oxidizers and sorbents identified in AK review to inform the Quality Level 1 (QL1) testing, and to conduct a series of QL1 tests to provide the scientific data to support a basis of knowledge document for determining the criteria for (1) accepting waste at the Waste Isolation Pilot Plant (WIPP) without treatment, (2) determining waste thatmore » will require treatment, and (3) if treatment is required, how the treatment must be performed. The purpose of this report is to present the results of the AK review of sorbents present in active waste streams, provide a technical analysis of the sorbent list, report the results of the scoping studies for the fastest-burning organic sorbent, and provide the list of organic and inorganic sorbents to be used in the development of a Test Plan for Preparation and Testing of Sorbents Mixed with Oxidizer found in Transuranic Waste (DWT-TP-001). The companion report, DWT-RPT-001, Oxidizer Scoping Studies, has similar information for oxidizers identified during the AK review of TRU waste streams. The results of the oxidizer and sorbent scoping studies will be used to inform the QL1 test plan. The QL1 test results will support the development of a basis of knowledge document that will evaluate oxidizing chemicals and sorbents in TRU waste and provide guidance for treatment.« less
Code of Federal Regulations, 2010 CFR
2010-04-01
... employee benefit plan information required by Item 1 of the Form; (ii) The statement of availability of registrant information, employee benefit plan annual reports and other information required by Item 2; and (iii) The documents containing registrant information and employee benefit plan annual reports that are...
A Plan for: A Consumer Conference for Older Adults.
ERIC Educational Resources Information Center
Zarakov, Selma
This document provides a step-by-step description of the planning and implementation of a two day consumer concerns conference for older adults held at Palomar Community College (California). The bulk of the document is made up of practical discussions of such planning phases as facility selection and decoration, conference publicity, snack and…
30 CFR 746.13 - Decision document and recommendation on mining plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Decision document and recommendation on mining plan. 746.13 Section 746.13 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR FEDERAL LANDS PROGRAM REVIEW AND APPROVAL OF MINING PLANS § 746.13 Decision...
Information security management system planning for CBRN facilities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lenaeu, Joseph D.; O'Neil, Lori Ross; Leitch, Rosalyn M.
The focus of this document is to provide guidance for the development of information security management system planning documents at chemical, biological, radiological, or nuclear (CBRN) facilities. It describes a risk-based approach for planning information security programs based on the sensitivity of the data developed, processed, communicated, and stored on facility information systems.
43 CFR 46.315 - How to format an environmental assessment.
Code of Federal Regulations, 2010 CFR
2010-10-01
... planning, decision-making, and appropriate public participation. (b) An environmental assessment may be accompanied by any other planning or decision-making document. The portion of the document that analyzes the...
Spacecraft servicing demonstration plan
NASA Technical Reports Server (NTRS)
Bergonz, F. H.; Bulboaca, M. A.; Derocher, W. L., Jr.
1984-01-01
A preliminary spacecraft servicing demonstration plan is prepared which leads to a fully verified operational on-orbit servicing system based on the module exchange, refueling, and resupply technologies. The resulting system can be applied at the space station, in low Earth orbit with an orbital maneuvering vehicle (OMV), or be carried with an OMV to geosynchronous orbit by an orbital transfer vehicle. The three phase plan includes ground demonstrations, cargo bay demonstrations, and free flight verifications. The plan emphasizes the exchange of multimission modular spacecraft (MMS) modules which involves space repairable satellites. Three servicer mechanism configurations are the engineering test unit, a protoflight quality unit, and two fully operational units that have been qualified and documented for use in free flight verification activity. The plan balances costs and risks by overlapping study phases, utilizing existing equipment for ground demonstrations, maximizing use of existing MMS equipment, and rental of a spacecraft bus.
DOE Office of Scientific and Technical Information (OSTI.GOV)
U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office
This Corrective Action Investigation Plan contains the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Operations Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 527, Horn Silver Mine, Nevada Test Site, Nevada, under the Federal Facility Agreement and Consent Order. Corrective Action Unit 527 consists of one Corrective Action Site (CAS): 26-20-01, Contaminated Waste Dump No.1. The site is located in an abandoned mine site in Area 26 (which is the most arid part of the NTS) approximately 65 miles northwest of Las Vegas. Historicalmore » documents may refer to this site as CAU 168, CWD-1, the Wingfield mine (or shaft), and the Wahmonie mine (or shaft). Historical documentation indicates that between 1959 and the 1970s, nonliquid classified material and unclassified waste was placed in the Horn Silver Mine's shaft. Some of the waste is known to be radioactive. Documentation indicates that the waste is present from 150 feet to the bottom of the mine (500 ft below ground surface). This CAU is being investigated because hazardous constituents migrating from materials and/or wastes disposed of in the Horn Silver Mine may pose a threat to human health and the environment as well as to assess the potential impacts associated with any potential releases from the waste. The results of this field investigation will support a defensible evaluation of corrective action alternatives in the corrective action decision document.« less
The 9th international symposium on the packaging and transportation of radioactive materials
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
1989-06-01
This three-volume document contains the papers and poster sessions presented at the symposium. Volume 3 contains 87 papers on topics such as structural codes and benchmarking, shipment of plutonium by air, spent fuel shipping, planning, package design and risk assessment, package testing, OCRWN operations experience and regulations. Individual papers were processed separately for the data base. (TEM)
Design Details for the Aquantis 2.5 MW Ocean Current Generation Device
Banko, Rich; Coakley, David; Colegrove, Dana; Fleming, Alex; Zierke, William; Ebner, Stephen
2015-06-03
Items in this submission provide the detailed design of the Aquantis Ocean Current Turbine and accompanying analysis documents, including preliminary designs, verification of design reports, CAD drawings of the hydrostatic drivetrain, a test plan and an operating conditions simulation report. This dataset also contains analysis trade off studies of fixed vs. variable pitch and 2 vs. 3 blades.
National Testing of Pupils in Europe: Objectives, Organisation and Use of Results. Lithuania 2009
ERIC Educational Resources Information Center
Bigeliene, Daiva; Gudynas, Pranas; Ranonyte, Asta; Uginciene, Egle
2009-01-01
The guiding principles of assessment policy and practice in Lithuania are described in the Law on Education (2003), General Curriculum and Educational Standards for Pre-school, Primary and Basic education (2003) and General Education Plans (2008-2009) as well as the special policy document on assessment called The Concept of Assessment of Pupils'…
Lamas, Daniela; Panariello, Natalie; Henrich, Natalie; Hammes, Bernard; Hanson, Laura C; Meier, Diane E; Guinn, Nancy; Corrigan, Janet; Hubber, Sean; Luetke-Stahlman, Hannah; Block, Susan
2018-04-01
To develop a set of clinically relevant recommendations to improve the state of advance care planning (ACP) documentation in the electronic health record (EHR). Advance care planning (ACP) is a key process that supports goal-concordant care. For preferences to be honored, clinicians must be able to reliably record, find, and use ACP documentation. However, there are no standards to guide ACP documentation in the electronic health record (EHR). We interviewed 21 key informants to understand the strengths and weaknesses of EHR documentation systems for ACP and identify best practices. We analyzed these interviews using a qualitative content analysis approach and subsequently developed a preliminary set of recommendations. These recommendations were vetted and refined in a second round of input from a national panel of content experts. Informants identified six themes regarding current inadequacies in documentation and accessibility of ACP information and opportunities for improvement. We offer a set of concise, clinically relevant recommendations, informed by expert opinion, to improve the state of ACP documentation in the EHR.
NASA Technical Reports Server (NTRS)
Callender, E. David; Steinbacher, Jody
1989-01-01
This is the second of five volumes of the Information System Life-Cycle and Documentation Standards. This volume provides a well-organized, easily used standard for management plans used in acquiring, assuring, and developing information systems and software, hardware, and operational procedures components, and related processes.
Kozlowski, L T; Dreschel, N A; Stellman, S D; Wilkenfeld, J; Weiss, E B; Goldberg, M E
2005-02-01
The Barclay cigarette (Brown & Williamson) was introduced in 1980 in the USA in the most expensive launch in history. In the USA and around the world, Barclay was later determined to have a grooved filter design that was compromised by human smokers in the normal act of smoking, but that was measured as ultra-low tar using the standard tar testing protocol. To evaluate whether Brown & Williamson knew of the compensatability of Barclay during the design process and before it was released; to evaluate initial responses of competing tobacco companies to Barclay, before complaints were made to the Federal Trade Commission in 1981. Internet databases of industry documents (Tobacco Documents Online, Legacy Tobacco Documents Library, Brown & Williamson Litigation discovery website, Guildford and major company websites) were searched using key words, key dates, and targeted searches. Documents related specifically to the development, evaluation and release of the Barclay cigarette and related to the responses by competing tobacco companies were examined. Documents indicate the manufacturer was aware of Barclay design problems and was planning, before release, to respond to criticism. Competing companies quickly detected the filter groove stratagem and considered developing their own similar filter, but eventually backed off. The design problems with Barclay were readily understood by cigarette manufacturers, including the maker of Barclay, before official governmental evaluations occurred. Testing involving measured exposures to human smokers may in the end be crucial to identifying problems with novel cigarette designs.
Dolan, R; Broadbent, P
2016-02-01
Ward round documentation provides one of the most important means of communication between healthcare professionals. We aimed to establish if the use of a problem based standardised proforma can improve documentation in acute surgical receiving. Gold standards were established using the RCSE record keeping guidelines. We audited documentation for seven days using the following headings: patient name/identification number, subjective findings, objective findings, clinical impression/diagnosis, plan, diet status, discharge decision, discharge planning, signature, and grade. After the initial audit cycle, a ward round proforma was introduced using the above headings and re-audited over a seven day period. The pre-intervention arm contained 50 patients and the post intervention arm contained 47. The following headings showed an improvement in documentation compliance to 100%: patient name/identification number vs 96%, subjective findings vs 84%, objective findings vs 48%, plan vs 98%, signature vs 96%, and grade vs 62%. Documentation of the clinical impression/diagnosis improved to 98% vs 30%, diet status rose to 83% vs 16%, discharge decision to 66% vs 16%, and discharge planning to 40% vs 20%. Standardised proformas improve the documentation of post-take ward round notes. This helps to clarify the onward management plan for all aspects of a patient's care and will help avoid adverse events and litigation. This should improve the quality and safety of Patient Care.
Social Work Assessment Notes: A Comprehensive Outcomes-Based Hospice Documentation System.
Hansen, Angela Gregory; Martin, Ellen; Jones, Barbara L; Pomeroy, Elizabeth C
2015-08-01
This article describes the development of an integrated psychosocial patient and caregiver assessment and plan of care for hospice social work documentation. A team of hospice social workers developed the Social Work Assessment Notes as a quality improvement project in collaboration with the information technology department. Using the Social Work Assessment Tool as an organizing framework, this comprehensive hospice social work documentation system is designed to integrate assessment, planning, and outcomes measurement. The system was developed to guide the assessment of patients' and caregivers' needs related to end-of-life psychosocial issues, to facilitate collaborative care plan development, and to measure patient- and family-centered outcomes. Goals established with the patient and the caregiver are documented in the plan of care and become the foundation for patient-centered, strengths-based interventions. Likert scales are used to assign numerical severity levels for identified issues and progress made toward goals and to track the outcome of social work interventions across nine psychosocial constructs. The documentation system was developed for use in an electronic health record but can be used for paper charting. Future plans include automated aggregate outcomes measurement to identify the most effective interventions and best practices in end-of-life care.
EPA Guidance for Geospatially Related Quality Assurance Project Plans
This March 2003 document discusses EPA's Quality Assurance (QA) Project Plan as a tool for project managers and planners to document the type and quality of data and information needed for making environmental decisions
Fuel efficient traffic signal operation and evaluation: Garden Grove Demonstration Project
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1983-02-01
The procedures and results of a case study of fuel efficient traffic signal operation and evaluation in the City of Garden Grove, California are documented. Improved traffic signal timing was developed for a 70-intersection test network in Garden Grove using an optimization tool called the TRANSYT Version 8 computer program. Full-scale field testing of five alternative timing plans was conducted using two instrumented vehicles equipped to measure traffic performance characteristics and fuel consumption. The field tests indicated that significant improvements in traffic flow and fuel consumption result from the use of timing plans generated by the TRANSYT optimization model. Changingmore » from pre-existing to an optimized timing plan yields a networkwide 5 percent reduction in total travel time, more than 10 percent reduction in both the number of stops and stopped delay time, and 6 percent reduction in fuel consumption. Projections are made of the benefits and costs of implementing such a program at the 20,000 traffic signals in networks throughout the State of California.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Iman, R.L.; Anderson, D.J.; Burress, R.V.
1995-06-01
The LRSTF combined the efforts of industry, military, and government to evaluate low-residue soldering processes for military and commercial applications. These processes were selected for evaluation because they provide a means for the military to support the presidential mandate while producing reliable hardware at a lower cost. This report presents the complete details and results of a testing program conducted by the LRSTF to evaluate low-residue soldering for printed wiring assemblies. A previous informal document provided details of the test plan used in this evaluation. Many of the details of that test plan are contained in this report. The testmore » data are too massive to include in this report, however, these data are available on disk as Excel spreadsheets upon request. The main purpose of low-residue soldering is to eliminate waste streams during the manufacturing process.« less
Koenen, F; Uttenthal, A; Meindl-Böhmer, A
2007-12-01
In order to adequately and efficiently handle outbreaks of contagious diseases such as classical swine fever (CSF), foot and mouth disease or highly pathogenic avian influenza, competent authorities and the laboratories involved have to be well prepared and must be in possession of functioning contingency plans. These plans should ensure that in the event of an outbreak access to facilities, equipment, resources, trained personnel, and all other facilities needed for the rapid and efficient eradication of the outbreak is guaranteed, and that the procedures to follow are well rehearsed. It is essential that these plans are established during 'peace-time' and are reviewed regularly. This paper provides suggestions on how to perform laboratory exercises to test preparedness and describes the experiences of two national reference laboratories for CSF. The major lesson learnt was the importance of a well-documented laboratory contingency plan. The major pitfalls encountered were shortage of space, difficulties in guaranteeing biosecurity and sufficient supplies of sterile equipment and consumables. The need for a standardised laboratory information management system, that is used by all those involved in order to reduce the administrative load, is also discussed.
Max Launch Abort System (MLAS) Landing Parachute Demonstrator (LPD) Drop Test
NASA Technical Reports Server (NTRS)
Shreves, Christopher M.
2011-01-01
The Landing Parachute Demonstrator (LPD) was conceived as a low-cost, rapidly-developed means of providing soft landing for the Max Launch Abort System (MLAS) crew module (CM). Its experimental main parachute cluster deployment technique and off-the-shelf hardware necessitated a full-scale drop test prior to the MLAS mission in order to reduce overall mission risk. This test was successfully conducted at Wallops Flight Facility on March 6, 2009, with all vehicle and parachute systems functioning as planned. The results of the drop test successfully qualified the LPD system for the MLAS flight test. This document captures the design, concept of operations and results of the drop test.
Technical Evaluation Motor No. 7 (TEM-07)
NASA Technical Reports Server (NTRS)
Hugh, Phil
1991-01-01
Technical Evaluation Motor Number 7 (TEM-7) was a full scale, full-duration static test firing of a high performance motor (HPM) configuration solid rocket motor (SRM) with nozzle vectoring. The static test fire occurred on 11 December 1990 at the Thiokol Corporation Static Test Bay T-97. Documented here are the procedures, performance, and results available through 22 January 1991. Critical post test hardware activities and assessment of the test data are not complete. A completed test report will be submitted 60 days after the test date. Included here is a presentation and discussion of the TEM-7 performance, anomalies, and test result concurrence with the objectives outlined in CTP-0107 Revision A, Space Shuttle Technical Evaluation Motor number 7 (TEM-07) Static Fire Test Plan.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sailer, S.J.
This Quality Assurance Project Plan (QAPJP) specifies the quality of data necessary and the characterization techniques employed at the Idaho National Engineering Laboratory (INEL) to meet the objectives of the Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP) Transuranic Waste Characterization Quality Assurance Program Plan (QAPP) requirements. This QAPJP is written to conform with the requirements and guidelines specified in the QAPP and the associated documents referenced in the QAPP. This QAPJP is one of a set of five interrelated QAPjPs that describe the INEL Transuranic Waste Characterization Program (TWCP). Each of the five facilities participating in the TWCPmore » has a QAPJP that describes the activities applicable to that particular facility. This QAPJP describes the roles and responsibilities of the Idaho Chemical Processing Plant (ICPP) Analytical Chemistry Laboratory (ACL) in the TWCP. Data quality objectives and quality assurance objectives are explained. Sample analysis procedures and associated quality assurance measures are also addressed; these include: sample chain of custody; data validation; usability and reporting; documentation and records; audits and 0385 assessments; laboratory QC samples; and instrument testing, inspection, maintenance and calibration. Finally, administrative quality control measures, such as document control, control of nonconformances, variances and QA status reporting are described.« less
Curriculum Planning and Some Current Health Problems. Educational Studies and Documents, No. 13.
ERIC Educational Resources Information Center
Southworth, Warren H.
This document is a supplement to the UNESCO Source Book "Planning for Health Education in Schools" by C. E. Turner. It is intended for those directly concerned with curriculum planning in relation to health--school administrators, health education supervisors, curriculum specialists, individual teachers--but it is also thought to be of interest to…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-10
... plan revision. The Comprehensive Evaluation Report (CER) provided for public review and comment in 2006, built upon the AMS and documents the evaluation of the 1987 Forest Plans and proposed changes. The CER.... The CER, under the 2005 and 2008 Planning Rules, served as the principle document that supported the...
Code of Federal Regulations, 2011 CFR
2011-04-01
... and subrecipients in a work program, or other document that describes the work to be accomplished... various combinations, or brought together as a single work program. The expenditure of PL funds for transportation planning outside of metropolitan planning areas under § 420.109(d) may be included in the work...
Child Care and Education: The Critical Connection. Action Plan [and] Policy Statement.
ERIC Educational Resources Information Center
Child Care Action Campaign, New York, NY.
This document presents the action plan of the Child Care Action Campaign (CCAC) for improving the quantity and quality of child care services. The document also provides a policy statement on linking education and child care efforts. The action plan describes CCAC's vision of a streamlined system providing child care to infants and toddlers,…
Planning guidance for the Chemical Stockpile Emergency Preparedness Program
DOE Office of Scientific and Technical Information (OSTI.GOV)
Shumpert, B.L.; Watson, A.P.; Sorensen, J.H.
1995-02-01
This planning guide was developed under the direction of the U.S. Army and the Federal Emergency Management Agency (FEMA) which jointly coordinate and direct the development of the Chemical Stockpile Emergency Preparedness Program (CSEPP). It was produced to assist state, local, and Army installation planners in formulating and coordinating plans for chemical events that may occur at the chemical agent stockpile storage locations in the continental United States. This document provides broad planning guidance for use by both on-post and off-post agencies and organizations in the development of a coordinated plan for responding to chemical events. It contains checklists tomore » assist in assuring that all important aspects are included in the plans and procedures developed at each Chemical Stockpile Disposal Program (CSDP) location. The checklists are supplemented by planning guidelines in the appendices which provide more detailed guidance regarding some issues. The planning guidance contained in this document will help ensure that adequate coordination between on-post and off-post planners occurs during the planning process. This planning guide broadly describes an adequate emergency planning base that assures that critical planning decisions will be made consistently at every chemical agent stockpile location. This planning guide includes material drawn from other documents developed by the FEMA, the Army, and other federal agencies with emergency preparedness program responsibilities. Some of this material has been developed specifically to meet the unique requirements of the CSEPP. In addition to this guidance, other location-specific documents, technical studies, and support studies should be used as needed to assist in the planning at each of the chemical agent stockpile locations to address the specific hazards and conditions at each location.« less
A case management tool for occupational health nurses: development, testing, and application.
Mannon, J A; Conrad, K M; Blue, C L; Muran, S
1994-08-01
1. Case management is a process of coordinating an individual client's health care services to achieve optimal, quality care delivered in a cost effective manner. The case manager establishes a provider network, recommends treatment plans that assure quality and efficacy while controlling costs, monitors outcomes, and maintains a strong communication link among all the parties. 2. Through development of audit tools such as the one presented in this article, occupational health nurses can document case management activities and provide employers with measurable outcomes. 3. The Case Management Activity Checklist was tested using data from 61 firefighters' musculoskeletal injury cases. 4. The activities on the checklist are a step by step process: case identification/case disposition; assessment; return to work plan; resource identification; collaborative communication; and evaluation.
The Intelligent Flight Control Program (IFCS)
NASA Technical Reports Server (NTRS)
2003-01-01
Institute for Scientific Research, Inc. (ISR) is pleased to submit this closeout report for the Research Cooperative Agreement NCC4-00128 of accomplishments for the Intelligent Flight Control System (IFCS) Project. It has been a pleasure working with NASA and NASA partners as we strive to meet the goals of this research initiative. ISR was engaged in this Research Cooperative Agreement beginning March 3, 2001 and ending March 31, 2003. During this time, a great deal has been accomplished and plans have been solidified for the continued success of this program. Our primary areas of involvement include the following: 1) ARTS II Master Test Plan; 2) ARTS II Hardware Design and Development; 3) ARTS II Software Design and Development; 4) IFCS PID/BLNN/OLNN Development; 5) Performed Preliminary and Formal Testing; 6) Documentation and Reporting.
ERIC Educational Resources Information Center
Hutchens, Dorothy
This lesson plan for elementary-age children studies some of the primary source documents and symbols of freedom which were and are important for the nation. The lesson plan uses the following documents: "The Mayflower Compact"; "The Declaration of Independence"; "The Constitution"; and the "Bill of Rights."…
The purpose of this memorandum is to ensure that EPA Regions scrutinize all proposed plans, draft and final RODs, and post-ROD documents that address institutional controls (ICs) in order to verify that they adequately document the objectives of the ICs and clearly identify who has responsibility for implementation, monitoring, reporting, and enforcement of the IC.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ankrum, A.R.; Bohlander, K.L.; Gilbert, E.R.
This report provides the results of comparisons of the cited and latest versions of ANS, ASME, AWS and NFPA standards cited in the NRC Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants (NUREG 0800) and related documents. The comparisons were performed by Battelle Pacific Northwest Laboratories in support of the NRC`s Standard Review Plan Update and Development Program. Significant changes to the standards, from the cited version to the latest version, are described and discussed in a tabular format for each standard. Recommendations for updating each citation in the Standard Review Plan are presented.more » Technical considerations and suggested changes are included for related regulatory documents (i.e., Regulatory Guides and the Code of Federal Regulations) citing the standard. The results and recommendations presented in this document have not been subjected to NRC staff review.« less
300 Area waste acid treatment system closure plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
LUKE, S.N.
1999-05-17
The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOERL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion includes closure plan documentation submitted for individual, treatment, storage, and/or disposal units undergoing closure, such as the 300 Area Waste Acid Treatment System. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in the General Information Portion). Whenever appropriate, 300 Area Waste Acid Treatment System documentation makes cross-reference to themore » General Information Portion, rather than duplicating text. This 300 Area Waste Acid Treatment System Closure Plan (Revision 2) includes a Hanford Facility Dangerous Waste Permit Application, Part A, Form 3. Information provided in this closure plan is current as of April 1999.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
DOE /NV
This Corrective Action Decision Document/Closure Report (CADD/CR) has been prepared for Corrective Action Unit (CAU) 252: Area 25 Engine Test Stand-1 Decontamination Pad, in accordance with the Federal Facility Agreement and Consent Order (FFACO). Located at the Nevada Test Site in Nevada, CAU 252 consists of only one Corrective Action Site (25-07-04, Decontamination Pad). This CADD/CR identifies and rationalizes the U.S. Department of Energy, Nevada Operations Office's (DOE/NV's) recommendation that no corrective action is deemed necessary at CAU 252. The Corrective Action Decision Document and Closure Report have been combined into one report because the potential contaminants of concern weremore » either not detected during the corrective action investigation or were only present at naturally occurring concentrations. Based on the field results, neither corrective action or a corrective action plan is required at this site. A Notice of Completion to DOE/NV is being requested from the Nevada Division of Environmental Protection for closure of CAU 252, as well as a request that this site be moved from Appendix III to Appendix IV of the FFACO. Further, no use restrictions are required to be placed on this CAU.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gutierrez, Marte
The research project aims to develop and validate an advanced computer model that can be used in the planning and design of stimulation techniques to create engineered reservoirs for Enhanced Geothermal Systems. The specific objectives of the proposal are to: 1) Develop a true three-dimensional hydro-thermal fracturing simulator that is particularly suited for EGS reservoir creation. 2) Perform laboratory scale model tests of hydraulic fracturing and proppant flow/transport using a polyaxial loading device, and use the laboratory results to test and validate the 3D simulator. 3) Perform discrete element/particulate modeling of proppant transport in hydraulic fractures, and use the resultsmore » to improve understand of proppant flow and transport. 4) Test and validate the 3D hydro-thermal fracturing simulator against case histories of EGS energy production. 5) Develop a plan to commercialize the 3D fracturing and proppant flow/transport simulator. The project is expected to yield several specific results and benefits. Major technical products from the proposal include: 1) A true-3D hydro-thermal fracturing computer code that is particularly suited to EGS, 2) Documented results of scale model tests on hydro-thermal fracturing and fracture propping in an analogue crystalline rock, 3) Documented procedures and results of discrete element/particulate modeling of flow and transport of proppants for EGS applications, and 4) Database of monitoring data, with focus of Acoustic Emissions (AE) from lab scale modeling and field case histories of EGS reservoir creation.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gutierrez, Marte
2013-12-31
This research project aims to develop and validate an advanced computer model that can be used in the planning and design of stimulation techniques to create engineered reservoirs for Enhanced Geothermal Systems. The specific objectives of the proposal are to; Develop a true three-dimensional hydro-thermal fracturing simulator that is particularly suited for EGS reservoir creation; Perform laboratory scale model tests of hydraulic fracturing and proppant flow/transport using a polyaxial loading device, and use the laboratory results to test and validate the 3D simulator; Perform discrete element/particulate modeling of proppant transport in hydraulic fractures, and use the results to improve understandmore » of proppant flow and transport; Test and validate the 3D hydro-thermal fracturing simulator against case histories of EGS energy production; and Develop a plan to commercialize the 3D fracturing and proppant flow/transport simulator. The project is expected to yield several specific results and benefits. Major technical products from the proposal include; A true-3D hydro-thermal fracturing computer code that is particularly suited to EGS; Documented results of scale model tests on hydro-thermal fracturing and fracture propping in an analogue crystalline rock; Documented procedures and results of discrete element/particulate modeling of flow and transport of proppants for EGS applications; and Database of monitoring data, with focus of Acoustic Emissions (AE) from lab scale modeling and field case histories of EGS reservoir creation.« less
Technical Basis for Electromagnetic Compatibility Regulatory Guidance Update
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ewing, Paul D.; Korsah, Kofi; Harrison, Thomas J.
2016-03-01
The objective of this report is to serve as the technical basis document for the next, planned revision of this RG that highlights and provides the rationale for the recommended changes. The structure of this document follows and summarizes the several assessment activities undertaken during the course of this project to evaluate new and updated electromagnetic compatibility (EMC) standards, testing methods and limits, and relevant technology developments being incorporated into plant activities that may have EMI/RFI implications, as well as other specific issues, including impacts of electrostatic discharge (ESD) on safety equipment and impacts on increased usage of wireless devicesmore » in nuclear power plants.« less
Environmental restoration and waste management: Five-year plan, Fiscal Years 1992--1996
DOE Office of Scientific and Technical Information (OSTI.GOV)
Middleman, L.I.
1990-06-01
This document reflects DOE's fulfillment of a major commitment of the Environmental Restoration and Waste Management Five-Year Plan: reorganization to create an Office of Environmental Restoration and Waste Management (EM) responsible for the consolidated environmental management of nuclear-related facilities and sites formerly under the Assistant Secretaries for Defense Programs and Nuclear Energy and the Director of the Office of Energy Research. The purposes of this Plan for FY 1992--1996 are to measure progress in meeting DOE's compliance, cleanup, and waste management agenda; to incorporate a revised and condensed version of the Draft Research Development, Demonstration, Testing, and Evaluation (RDDT E)more » Plan (November 1989) to describe DOE's process for developing the new technologies critically needed to solve its environmental problems; to show DOE's current strategy and planned activities through FY 1996, including reasons for changes required to meet compliance and cleanup commitments; and to increase the involvement of other agencies and the public in DOE's planning.« less
An integrated knowledge system for wind tunnel testing - Project Engineers' Intelligent Assistant
NASA Technical Reports Server (NTRS)
Lo, Ching F.; Shi, George Z.; Hoyt, W. A.; Steinle, Frank W., Jr.
1993-01-01
The Project Engineers' Intelligent Assistant (PEIA) is an integrated knowledge system developed using artificial intelligence technology, including hypertext, expert systems, and dynamic user interfaces. This system integrates documents, engineering codes, databases, and knowledge from domain experts into an enriched hypermedia environment and was designed to assist project engineers in planning and conducting wind tunnel tests. PEIA is a modular system which consists of an intelligent user-interface, seven modules and an integrated tool facility. Hypermedia technology is discussed and the seven PEIA modules are described. System maintenance and updating is very easy due to the modular structure and the integrated tool facility provides user access to commercial software shells for documentation, reporting, or database updating. PEIA is expected to provide project engineers with technical information, increase efficiency and productivity, and provide a realistic tool for personnel training.
76 FR 69172 - Determination of Governmental Plan Status
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-08
...The Treasury Department and IRS anticipate issuing regulations under section 414(d) of the Internal Revenue Code (Code) to define the term ``governmental plan.'' This document describes the rules that the Treasury Department and IRS are considering proposing relating to the determination of whether a plan is a governmental plan within the meaning of section 414(d) and contains an appendix that includes a draft notice of proposed rulemaking on which the Treasury Department and IRS invite comments from the public. This document applies to sponsors of, and participants and beneficiaries in, employee benefit plans that are determined to be governmental plans.
Acceptance testing for PACS: from methodology to design to implementation
NASA Astrophysics Data System (ADS)
Liu, Brent J.; Huang, H. K.
2004-04-01
Acceptance Testing (AT) is a crucial step in the implementation process of a PACS within a clinical environment. AT determines whether the PACS is ready for clinical use and marks the official sign off of the PACS product. Most PACS vendors have Acceptance Testing (AT) plans, however, these plans do not provide a complete and robust evaluation of the full system. In addition, different sites will have different special requirements that vendor AT plans do not cover. The purpose of this paper is to introduce a protocol for AT design and present case studies of AT performed on clinical PACS. A methodology is presented that includes identifying testing components within PACS, quality assurance for both functionality and performance, and technical testing focusing on key single points-of-failure within the PACS product. Tools and resources that provide assistance in performing AT are discussed. In addition, implementation of the AT within the clinical environment and the overall implementation timeline of the PACS process are presented. Finally, case studies of actual AT of clinical PACS performed in the healthcare environment will be reviewed. The methodology for designing and implementing a robust AT plan for PACS was documented and has been used in PACS acceptance tests in several sites. This methodology can be applied to any PACS and can be used as a validation for the PACS product being acquired by radiology departments and hospitals. A methodology for AT design and implementation was presented that can be applied to future PACS installations. A robust AT plan for a PACS installation can increase both the utilization and satisfaction of a successful implementation of a PACS product that benefits both vendor and customer.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Krenzien, Susan; Farnham, Irene
This Quality Assurance Plan (QAP) provides the overall quality assurance (QA) requirements and general quality practices to be applied to the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) Underground Test Area (UGTA) activities. The requirements in this QAP are consistent with DOE Order 414.1D, Change 1, Quality Assurance (DOE, 2013a); U.S. Environmental Protection Agency (EPA) Guidance for Quality Assurance Project Plans for Modeling (EPA, 2002); and EPA Guidance on the Development, Evaluation, and Application of Environmental Models (EPA, 2009). If a participant’s requirement document differs from this QAP, the stricter requirement will take precedence.more » NNSA/NFO, or designee, must review this QAP every two years. Changes that do not affect the overall scope or requirements will not require an immediate QAP revision but will be incorporated into the next revision cycle after identification. Section 1.0 describes UGTA objectives, participant responsibilities, and administrative and management quality requirements (i.e., training, records, procurement). Section 1.0 also details data management and computer software requirements. Section 2.0 establishes the requirements to ensure newly collected data are valid, existing data uses are appropriate, and environmental-modeling methods are reliable. Section 3.0 provides feedback loops through assessments and reports to management. Section 4.0 provides the framework for corrective actions. Section 5.0 provides references for this document.« less
Salvage plan & information sheet
DOT National Transportation Integrated Search
1997-11-05
This document allows the On Scene Coordinator (OSC) or Captain of the Port (COTP) to formulate and evaluate the impact of a Salvage Plan. Specifically, this document allows the OSC or COTP to: 1. Quickly gather all information needed during the respo...
FY 1998 Proposed Rail Improvement Program
DOT National Transportation Integrated Search
1997-01-01
The Illinois Department of Transportation has, in the past, published its Rail program yearly, and its Rail plan as needs dictate. The department has combined : both documents into one. This new document, as with those Programs and Plans : that have ...
NASA Technical Reports Server (NTRS)
Wilcox, Margaret
2008-01-01
A CSEA is similar to a Failure Modes Effects Analysis (FMEA). A CSEA tracks risk, deterrence, and occurrence of sources of contamination and their mitigation plans. Documentation is provided spanning mechanical and electrical assembly, precision cleaning, thermal vacuum bake-out, and thermal vacuum testing. These facilities all may play a role in contamination budgeting and reduction ultimately affecting test and flight. With a CSEA, visibility can be given to availability of these facilities, test sequencing and trade-offs. A cross-functional team including specialty engineering, contamination control, electrostatic dissipation, manufacturing, testing, and material engineering participate in an exercise that identifies contaminants and minimizes the complexity of scheduling these facilities considering their volatile schedules. Care can be taken in an efficient manner to insure correct cleaning processes are employed. The result is reduction in cycle time ("schedule hits"), reduced cost due to rework, reduced risk and improved communication and quality while achieving adherence to the Contamination Control Plan.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rivard, MJ; Rothley, DJ
2016-06-15
Purpose: The VariSeed 9.0 brachytherapy TPS is recently available and has new features such as ability to rotate a brachytherapy source away from normal to the imaging plane. Consequently, a dosimetric analysis was performed for a directional brachytherapy source (CivaSheet) with tests of this functionality and experiences from clinical treatment planning were documented. These observations contribute to safe, practical, and accurate use of such new software features. Methods: Several tests were established to evaluate the new rotational feature, specific to the CivaSheet for the first patients treated using this new brachytherapy device. These included suitability of imaging slice-thickness and in-planemore » resolution, window/level adjustments for brachytherapy source visualization, commissioning the source physical length for performing rotations, and using different planar and 3D window views to identify source orientation. Additional CivaSheet-specific tests were performed to determine the dosimetric influence on target coverage: changing the source tilt angle, source positioning in the treatment plan based on the CivaSheet rectangular array of CivaDots, and influence of prescription depth on the necessary treatment margin for adequate target coverage. Results: Higher imaging-resolution produced better accuracy for source orientation and positioning, with sub-millimeter CT slice-thickness and in-plane resolution preferred. Source rotation was possible only in sagittal or coronal views. The process for validating source orientation required iteratively altering rotations then checking them in the 3D view, which was cumbersome given the absence of quantitative plan documentation to indicate orientation. Given the small Pd-103 source size, influence of source tilt within 30° was negligible for <1.0 cm. Influence of source position was important when the source was positioned in/out of the adjacent source plane, causing changes of 15%, 7%, and 3% at depths of 0.5, 0.7, and 1.0 cm. Conclusion: The new TPS rotational feature worked well, but several issues were identified to improve the treatment planning process. Research supported in part by CivaTech Oncology, Inc. for Dr. Rivard.« less
The Village Green Project: Lesson Plans for K-8 Educators ...
This document contains lesson plans spanning kindergarten through 8th grade, that are written to connect next-generation science standards (USA) to the Village Green Project and related air quality topics. This document contains a series of classroom lesson plans to support connections between the Village Green Project and the USA National Science Standards at various education levels.
Code of Federal Regulations, 2010 CFR
2010-04-01
... plan may provide that any such document may be transferred to microfilm or other recording medium after... years or at such earlier date as is specified in a plan for the destruction or disposition of any such documents if such plan has been filed with the Commission by such exchange, association, clearing agency or...
Manager's handbook for software development, revision 1
NASA Technical Reports Server (NTRS)
1990-01-01
Methods and aids for the management of software development projects are presented. The recommendations are based on analyses and experiences of the Software Engineering Laboratory (SEL) with flight dynamics software development. The management aspects of the following subjects are described: organizing the project, producing a development plan, estimating costs, scheduling, staffing, preparing deliverable documents, using management tools, monitoring the project, conducting reviews, auditing, testing, and certifying.
FDA plan for statutory compliance. Notice of availability.
1998-11-24
The Food and Drug Administration (FDA) is announcing the availability of a document entitled "FDA Plan for Statutory Compliance" (the plan). This document is the agency's response to section 406(b) of the Food and Drug Administration Modernization Act of 1997 (FDAMA), which requires the Secretary of the Department of Health and Human Services (the Secretary) to develop a plan bringing the agency into compliance with the requirements of the Federal Food, Drug, and Cosmetic Act (the act).
Hypersonic Vehicle Propulsion System Simplified Model Development
NASA Technical Reports Server (NTRS)
Stueber, Thomas J.; Raitano, Paul; Le, Dzu K.; Ouzts, Peter
2007-01-01
This document addresses the modeling task plan for the hypersonic GN&C GRC team members. The overall propulsion system modeling task plan is a multi-step process and the task plan identified in this document addresses the first steps (short term modeling goals). The procedures and tools produced from this effort will be useful for creating simplified dynamic models applicable to a hypersonic vehicle propulsion system. The document continues with the GRC short term modeling goal. Next, a general description of the desired simplified model is presented along with simulations that are available to varying degrees. The simulations may be available in electronic form (FORTRAN, CFD, MatLab,...) or in paper form in published documents. Finally, roadmaps outlining possible avenues towards realizing simplified model are presented.
Pöder, Ulrika; Dahm, Marie Fogelberg; Karlsson, Nina; Wadensten, Barbro
2015-10-01
To compare stroke unit staff members' documentation of care in line with evidence-based guidelines pre- and postimplementation of a multi-professional, evidence-based standardised care plan for stroke care in the electronic health record. Rapid and effective measures for patients with stroke or suspected stroke can limit the extent of damage; it is imperative that patients be observed, assessed and treated in accordance with evidence-based practice in hospital. Quantitative, comparative. Structured retrospective health record reviews were made prior to (n 60) and one and a half years after implementation (n 60) of a multi-professional evidence-based standardised care plan with a quality standard for stroke care in the electronic health record. Significant improvements were found in documentation of assessed vital signs, except for body temperature, Day 1 post compared with preimplementation. Documentation frequency regarding body temperature Day 1 and blood pressure and pulse Day 2 decreased post compared with preimplementation. Improvements were also detected in documented observations of patients' micturition capacity, swallowing capacity and mouth status and the proportion of physiotherapist-documented aid assessments. Observations of blood glucose, mobilisation ability and speech and communication ability were unchanged. An evidence-based standardised care plan in an electronic health record assists staff in improving documentation of health status assessments during the first days after a stroke diagnosis. Use of a standardised care plan seems to have the potential to help staff adhere to evidence-based patient care and, thereby, to increase patient safety. © 2015 John Wiley & Sons Ltd.
Gearbox Reliability Collaborative Phase 3 Gearbox 3 Test
Keller, Jonathan (ORCID:0000000177243885)
2016-12-28
The GRC uses a combined gearbox testing, modeling, and analysis approach disseminating data and results to the industry and facilitating improvement of gearbox reliability. This test data describes the tests of GRC gearbox 3 in the National Wind Technology Center dynamometer and documents any modifications to the original test plan. It serves as a guide to interpret the publicly released data sets with brief analyses to illustrate the data. TDMS viewer and Solidworks software required to view data files. The National Renewable Energy Laboratory (NREL) Gearbox Reliability Collaborative (GRC) was established by the U.S. Department of Energy in 2006; its key goal is to understand the root causes of premature gearbox failures and improve their reliability.
Gearbox Reliability Collaborative Phase 3 Gearbox 2 Test
Keller, Jonathan; Robb, Wallen
2016-05-12
The National Renewable Energy Laboratory (NREL) Gearbox Reliability Collaborative (GRC) was established by the U.S. Department of Energy in 2006; its key goal is to understand the root causes of premature gearbox failures and improve their reliability. The GRC uses a combined gearbox testing, modeling, and analysis approach disseminating data and results to the industry and facilitating improvement of gearbox reliability. This test data describes the tests of GRC gearbox 2 in the National Wind Technology Center dynamometer and documents any modifications to the original test plan. It serves as a guide to interpret the publicly released data sets with brief analyses to illustrate the data. TDMS viewer and Solidworks software required to view data files.
Closure Plan for the Area 5 Radioactive Waste Management Site at the Nevada Test Site
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Management
The Area 5 Radioactive Waste Management Site (RMWS) at the Nevada Test Site (NTS) is managed and operated by National Security Technologies, LLC (NSTec), for the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This document is the first update of the preliminary closure plan for the Area 5 RWMS at the NTS that was presented in the Integrated Closure and Monitoring Plan (DOE, 2005a). The major updates to the plan include a new closure schedule, updated closure inventory, updated site and facility characterization data, the Title II engineering cover design, and the closure processmore » for the 92-Acre Area of the RWMS. The format and content of this site-specific plan follows the Format and Content Guide for U.S. Department of Energy Low-Level Waste Disposal Facility Closure Plans (DOE, 1999a). This interim closure plan meets closure and post-closure monitoring requirements of the order DOE O 435.1, manual DOE M 435.1-1, Title 40 Code of Federal Regulations (CFR) Part 191, 40 CFR 265, Nevada Administrative Code (NAC) 444.743, and Resource Conservation and Recovery Act (RCRA) requirements as incorporated into NAC 444.8632. The Area 5 RWMS accepts primarily packaged low-level waste (LLW), low-level mixed waste (LLMW), and asbestiform low-level waste (ALLW) for disposal in excavated disposal cells.« less
Network Operations Support Plan for the Spot 2 mission (revision 1)
NASA Technical Reports Server (NTRS)
Werbitzky, Victor
1989-01-01
The purpose of this Network Operations Support Plan (NOSP) is to indicate operational procedures and ground equipment configurations for the SPOT 2 mission. The provisions in this document take precedence over procedures or configurations in other documents.
40 CFR 60.4355 - How do I establish and document a proper parameter monitoring plan?
Code of Federal Regulations, 2010 CFR
2010-07-01
... Standards of Performance for Stationary Combustion Turbines Monitoring § 60.4355 How do I establish and document a proper parameter monitoring plan? (a) The steam or water to fuel ratio or other parameters that...
Sampling and analysis plan for sludge located on the floor and in the pits of the 105-K basins
DOE Office of Scientific and Technical Information (OSTI.GOV)
BAKER, R.B.
1998-11-20
This Sampling and Analysis Plan (SAP) provides direction for the sampling of the sludge found on the floor and in the remote pits of the 105-K Basins to provide: (1) basic data for the sludges that have not been characterized to-date and (2) representative Sludge material for process tests to be made by the SNF Project/K Basins sludge treatment process subproject. The sampling equipment developed will remove representative samples of the radioactive sludge from underwater at the K Basins, depositing them in shielded containers for transport to the Hanford Site laboratories. Included in the present document is the basic backgroundmore » logic for selection of the samples to meet the requirements established in the Data Quality Objectives (DQO), HNF-2033, for this sampling activity. The present document also includes the laboratory analyses, methods, procedures, and reporting that will be required to meet the DQO.« less
Automation of Cassini Support Imaging Uplink Command Development
NASA Technical Reports Server (NTRS)
Ly-Hollins, Lisa; Breneman, Herbert H.; Brooks, Robert
2010-01-01
"Support imaging" is imagery requested by other Cassini science teams to aid in the interpretation of their data. The generation of the spacecraft command sequences for these images is performed by the Cassini Instrument Operations Team. The process initially established for doing this was very labor-intensive, tedious and prone to human error. Team management recognized this process as one that could easily benefit from automation. Team members were tasked to document the existing manual process, develop a plan and strategy to automate the process, implement the plan and strategy, test and validate the new automated process, and deliver the new software tools and documentation to Flight Operations for use during the Cassini extended mission. In addition to the goals of higher efficiency and lower risk in the processing of support imaging requests, an effort was made to maximize adaptability of the process to accommodate uplink procedure changes and the potential addition of new capabilities outside the scope of the initial effort.
Indexing NASA programs for technology transfer methods development and feasibility
NASA Technical Reports Server (NTRS)
Clingman, W. H.
1972-01-01
This project was undertaken to evaluate the application of a previously developed indexing methodology to ongoing NASA programs. These programs are comprehended by the NASA Program Approval Documents (PADS). Each PAD contains a technical plan for the area it covers. It was proposed that these could be used to generate an index to the complete NASA program. To test this hypothesis two PADS were selected by the NASA Technology Utilization Office for trial indexing. Twenty-five individuals indexed the two PADS using NASA Thesaurus terms. The results demonstrated the feasibility of indexing ongoing NASA programs using PADS as the source of information. The same indexing methodology could be applied to other documents containing a brief description of the technical plan. Results of this project showed that over 85% of the concepts in the technology should be covered by the indexing. Also over 85% of the descriptors chosen would be accurate. This completeness and accuracy for the indexing is considered satisfactory for application in technology transfer.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Waddell, Lucas; Muldoon, Frank; Henry, Stephen Michael
In order to effectively plan the management and modernization of their large and diverse fleets of vehicles, Program Executive Office Ground Combat Systems (PEO GCS) and Program Executive Office Combat Support and Combat Service Support (PEO CS&CSS) commis- sioned the development of a large-scale portfolio planning optimization tool. This software, the Capability Portfolio Analysis Tool (CPAT), creates a detailed schedule that optimally prioritizes the modernization or replacement of vehicles within the fleet - respecting numerous business rules associated with fleet structure, budgets, industrial base, research and testing, etc., while maximizing overall fleet performance through time. This paper contains a thor-more » ough documentation of the terminology, parameters, variables, and constraints that comprise the fleet management mixed integer linear programming (MILP) mathematical formulation. This paper, which is an update to the original CPAT formulation document published in 2015 (SAND2015-3487), covers the formulation of important new CPAT features.« less
Knowledge enabled plan of care and documentation prototype.
DaDamio, Rebecca; Gugerty, Brian; Kennedy, Rosemary
2006-01-01
There exist significant challenges in integrating the plan of care into documentation and point of care operational processes. A plan of care is often a static artifact that meets regulatory standards with limited influence on supporting goal-directed care delivery processes. Although this prototype is applicable to many clinical disciplines, we will highlight nursing processes in demonstrating a knowledge-driven computerized solution that fully integrates the plan of care within documentation. The knowledge-driven solution reflects evidenced-based practice; is an effective tool for managing problems, orders/interventions, and the patient's progress towards expected outcomes; meets regulatory standards; and drives quality and process improvement. The knowledge infrastructure consists of fully represented terminology, structured clinical expressions utilizing the controlled terminology and clinical knowledge representing evidence-based practice.
Vedula, S Swaroop; Li, Tianjing; Dickersin, Kay
2013-01-01
Details about the type of analysis (e.g., intent to treat [ITT]) and definitions (i.e., criteria for including participants in the analysis) are necessary for interpreting a clinical trial's findings. Our objective was to compare the description of types of analyses and criteria for including participants in the publication (i.e., what was reported) with descriptions in the corresponding internal company documents (i.e., what was planned and what was done). Trials were for off-label uses of gabapentin sponsored by Pfizer and Parke-Davis, and documents were obtained through litigation. For each trial, we compared internal company documents (protocols, statistical analysis plans, and research reports, all unpublished), with publications. One author extracted data and another verified, with a third person verifying discordant items and a sample of the rest. Extracted data included the number of participants randomized and analyzed for efficacy, and types of analyses for efficacy and safety and their definitions (i.e., criteria for including participants in each type of analysis). We identified 21 trials, 11 of which were published randomized controlled trials, and that provided the documents needed for planned comparisons. For three trials, there was disagreement on the number of randomized participants between the research report and publication. Seven types of efficacy analyses were described in the protocols, statistical analysis plans, and publications, including ITT and six others. The protocol or publication described ITT using six different definitions, resulting in frequent disagreements between the two documents (i.e., different numbers of participants were included in the analyses). Descriptions of analyses conducted did not agree between internal company documents and what was publicly reported. Internal company documents provide extensive documentation of methods planned and used, and trial findings, and should be publicly accessible. Reporting standards for randomized controlled trials should recommend transparent descriptions and definitions of analyses performed and which study participants are excluded.
Trade study plan for Reusable Hydrogen Composite Tank System (RHCTS)
NASA Astrophysics Data System (ADS)
Greenberg, H. S.
1994-07-01
This TA 1 document describes the trade study plan (with support from TA 2) that will identify the most suitable structural configuration for an SSTO winged vehicle capable of delivering 25,000 lbs to a 220 nm circular orbit at 51.6 degree inclination. The analysis uses information derived in the TA 2 study as identified within the study plan. In view of this, for convenience, the TA 2 study plan is included as an appendix to this document.
Trade study plan for Reusable Hydrogen Composite Tank System (RHCTS)
NASA Technical Reports Server (NTRS)
Greenberg, H. S.
1994-01-01
This TA 1 document describes the trade study plan (with support from TA 2) that will identify the most suitable structural configuration for an SSTO winged vehicle capable of delivering 25,000 lbs to a 220 nm circular orbit at 51.6 degree inclination. The analysis uses information derived in the TA 2 study as identified within the study plan. In view of this, for convenience, the TA 2 study plan is included as an appendix to this document.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-15
... Checklist: Medicaid Eligibility & Enrollment Systems--Advance Planning Document (E&E-APD); Use: Under... Eligibility/Enrollment Systems APD approval assignment. The information requested on the Checklist will be... an Expedited Checklist: Medicaid Eligibility & Enrollment Systems--Advance Planning Document (E& -APD...
No Further Remedial Action Planned Decision Document for Site 3.
1998-04-01
INSTALLATION RESTORATION PROGRAM No FURTHER REMEDIAL ACTION PLANNED DECISION DOCUMENT FOR SITE 3 FINAL MICHIGAN AIR NATIONAL GUARD ALPENA ...COMBAT READINESS TRAINING CENTER ALPENA , MICHIGAN April 1998 Air National Guard Andrews AFB, Maryland &nc QUALITY IMSmm«^ 19980519 204 XA REPORT...Document for Site 3 at Alpena CRTC, Alpena , MI. 6. AUTHOR(S) N/A 5. FUNDING NUMBERS 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Montgomery
Alvarado Flood Risk Management Modifications to Existing Project Section 408 Review. Review Plan
2012-12-26
Digital Flood Insurance Rate Maps) through the Nationa l Flood Insurance Program ( NFIP ). In order to obtain FEMA accreditation, the levee owner...compliance documentation for meeting NFIP requirements. Barr conducted a thorough review of relevant documents to gain a better understanding of...compliance documentation for meeting NFIP requirements. Barr Engineering has prepared a Phase I Engineer’s Report and is developing plans and
NASA Technical Reports Server (NTRS)
Lovejoy, Andrew E.; Hilburger, Mark W.
2013-01-01
This document outlines a Modeling and Analysis Plan (MAP) to be followed by the SBKF analysts. It includes instructions on modeling and analysis formulation and execution, model verification and validation, identifying sources of error and uncertainty, and documentation. The goal of this MAP is to provide a standardized procedure that ensures uniformity and quality of the results produced by the project and corresponding documentation.
Kozlowski, L; Dreschel, N; Stellman, S; Wilkenfeld, J; Weiss, E; Goldberg, M
2005-01-01
Background: The Barclay cigarette (Brown & Williamson) was introduced in 1980 in the USA in the most expensive launch in history. In the USA and around the world, Barclay was later determined to have a grooved filter design that was compromised by human smokers in the normal act of smoking, but that was measured as ultra-low tar using the standard tar testing protocol. Objectives: To evaluate whether Brown & Williamson knew of the compensatability of Barclay during the design process and before it was released; to evaluate initial responses of competing tobacco companies to Barclay, before complaints were made to the Federal Trade Commission in 1981. Methods: Internet databases of industry documents (Tobacco Documents Online, Legacy Tobacco Documents Library, Brown & Williamson Litigation discovery website, Guildford and major company websites) were searched using key words, key dates, and targeted searches. Documents related specifically to the development, evaluation and release of the Barclay cigarette and related to the responses by competing tobacco companies were examined. Results: Documents indicate the manufacturer was aware of Barclay design problems and was planning, before release, to respond to criticism. Competing companies quickly detected the filter groove stratagem and considered developing their own similar filter, but eventually backed off. Conclusion: The design problems with Barclay were readily understood by cigarette manufacturers, including the maker of Barclay, before official governmental evaluations occurred. Testing involving measured exposures to human smokers may in the end be crucial to identifying problems with novel cigarette designs. PMID:15735303
Ebert, Lars Christian; Ptacek, Wolfgang; Breitbeck, Robert; Fürst, Martin; Kronreif, Gernot; Martinez, Rosa Maria; Thali, Michael; Flach, Patricia M
2014-06-01
In this paper we present the second prototype of a robotic system to be used in forensic medicine. The system is capable of performing automated surface documentation using photogrammetry, optical surface scanning and image-guided, post-mortem needle placement for tissue sampling, liquid sampling, or the placement of guide wires. The upgraded system includes workflow optimizations, an automatic tool-change mechanism, a new software module for trajectory planning and a fully automatic computed tomography-data-set registration algorithm. We tested the placement accuracy of the system by using a needle phantom with radiopaque markers as targets. The system is routinely used for surface documentation and resulted in 24 surface documentations over the course of 11 months. We performed accuracy tests for needle placement using a biopsy phantom, and the Virtobot placed introducer needles with an accuracy of 1.4 mm (±0.9 mm). The second prototype of the Virtobot system is an upgrade of the first prototype but mainly focuses on streamlining the workflow and increasing the level of automation and also has an easier user interface. These upgrades make the Virtobot a potentially valuable tool for case documentation in a scalpel-free setting that uses purely imaging techniques and minimally invasive procedures and is the next step toward the future of virtual autopsy.
Test Series 2. 4: detailed test plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
Test Series 2.4 comprises the fourth sub-series of tests to be scheduled as a part of Test Series 2, the second stage of the combustion research program to be carried out at the Grimethorpe Experimental Pressurized Fluidized Bed Combustion Facility. Test Series 2.1, the first sub-series of tests, was completed in February 1983, and the first part of the second sub-series, Test Series 2.3, in October 1983. Test Series 2.2 was completed in February 1984 after which the second part of Test Series 2.3 commenced. The Plan for Test Series 2.4 consists of 350 data gathering hours to be completedmore » within 520 coal burning hours. This document provides a brief description of the Facility and modifications which have been made following the completion of Test Series 2.1. No further modifications were made following the completion of the first part of Test Series 2.3 or Test Series 2.2. The operating requirements for Test Series 2.4 are specified. The tests will be performed using a UK coal (Lady Windsor), and a UK limestone (Middleton) both nominated by the FRG. Seven objectives are proposed which are to be fulfilled by thirteen test conditions. Six part load tests based on input supplied by Kraftwerk Union AG are included. The cascade is expected to be on line for each test condition and total cascade exposure is expected to be in excess of 450 hours. Details of sampling and special measurements are given. A test plan schedule envisages the full test series being completed within a two month calendar period. Finally, a number of contingency strategies are proposed. 3 figures, 14 tables.« less
Access 5 - Step 1: Human Systems Integration Program Plan (HSIPP)
NASA Technical Reports Server (NTRS)
2005-01-01
This report describes the Human System Interface (HSI) analysis, design and test activities that will be performed to support the development of requirements and design guidelines to facilitate the incorporation of High Altitude Long Endurance (HALE) Remotely Operated Aircraft (ROA) at or above FL400 in the National Airspace System (NAS). These activities are required to support the design and development of safe, effective and reliable ROA operator and ATC interfaces. This plan focuses on the activities to be completed for Step 1 of the ACCESS 5 program. Updates to this document will be made for each of the four ACCESS 5 program steps.
Engineering and simulation of life science Spacelab experiments
NASA Technical Reports Server (NTRS)
Bush, B.; Rummel, J.; Johnston, R. S.
1977-01-01
Approaches to the planning and realization of Spacelab life sciences experiments, which may involve as many as 16 Space Shuttle missions and 100 tests, are discussed. In particular, a Spacelab simulation program, designed to evaluate problems associated with the use of live animal specimens, the constraints imposed by zero gravity on equipment operation, training of investigators and data management, is described. The simulated facility approximates the hardware and support systems of a current European Space Agency Spacelab model. Preparations necessary for the experimental program, such as crew activity plans, payload documentation and inflight experimental procedures are developed; health problems of the crew, including human/animal microbial contamination, are also assessed.
Plan Execution Interchange Language (PLEXIL)
NASA Technical Reports Server (NTRS)
Estlin, Tara; Jonsson, Ari; Pasareanu, Corina; Simmons, Reid; Tso, Kam; Verma, Vandi
2006-01-01
Plan execution is a cornerstone of spacecraft operations, irrespective of whether the plans to be executed are generated on board the spacecraft or on the ground. Plan execution frameworks vary greatly, due to both different capabilities of the execution systems, and relations to associated decision-making frameworks. The latter dependency has made the reuse of execution and planning frameworks more difficult, and has all but precluded information sharing between different execution and decision-making systems. As a step in the direction of addressing some of these issues, a general plan execution language, called the Plan Execution Interchange Language (PLEXIL), is being developed. PLEXIL is capable of expressing concepts used by many high-level automated planners and hence provides an interface to multiple planners. PLEXIL includes a domain description that specifies command types, expansions, constraints, etc., as well as feedback to the higher-level decision-making capabilities. This document describes the grammar and semantics of PLEXIL. It includes a graphical depiction of this grammar and illustrative rover scenarios. It also outlines ongoing work on implementing a universal execution system, based on PLEXIL, using state-of-the-art rover functional interfaces and planners as test cases.
Configuration Management Plan for the Tank Farm Contractor
DOE Office of Scientific and Technical Information (OSTI.GOV)
WEIR, W.R.
The Configuration Management Plan for the Tank Farm Contractor describes configuration management the contractor uses to manage and integrate its technical baseline with the programmatic and functional operations to perform work. The Configuration Management Plan for the Tank Farm Contractor supports the management of the project baseline by providing the mechanisms to identify, document, and control the technical characteristics of the products, processes, and structures, systems, and components (SSC). This plan is one of the tools used to identify and provide controls for the technical baseline of the Tank Farm Contractor (TFC). The configuration management plan is listed in themore » management process documents for TFC as depicted in Attachment 1, TFC Document Structure. The configuration management plan is an integrated approach for control of technical, schedule, cost, and administrative processes necessary to manage the mission of the TFC. Configuration management encompasses the five functional elements of: (1) configuration management administration, (2) configuration identification, (3) configuration status accounting, (4) change control, and (5 ) configuration management assessments.« less
ATLAS LTCS Vertically Challenged System Lessons Learned
NASA Technical Reports Server (NTRS)
Patel, Deepak; Garrison, Matt; Ku, Jentung
2014-01-01
Re-planning of LTCS TVAC testing and supporting RTA (Receiver Telescope Assembly) Test Plan and Procedure document preparation. The Laser Thermal Control System (LTCS) is designed to maintain the lasers onboard Advanced Topographic Laser Altimeter System (ATLAS) at their operational temperatures. In order to verify the functionality of the LTCS, a thermal balance test of the thermal hardware was performed. During the first cold start of the LTCS, the Loop Heat Pipe (LHP) was unable to control the laser mass simulators temperature. The control heaters were fully on and the loop temperature remained well below the desired setpoint. Thermal analysis of the loop did not show these results. This unpredicted behavior of the LTCS was brought up to a panel of LHP experts. Based on the testing and a review of all the data, there were multiple diagnostic performed in order to narrow down the cause. The prevailing theory is that gravity is causing oscillating flow within the loop, which artificially increased the control power needs. This resulted in a replan of the LTCS test flow and the addition of a GSE heater to allow vertical operation.
DOT National Transportation Integrated Search
2016-07-12
This document describes the Performance Measurement and Evaluation Support Plan for the New York City Department of Transportation New York City (NYC) Connected Vehicle Pilot Deployment (CVPD) Project. The report documents the performance metrics tha...
Computer Disaster Recovery Planning.
ERIC Educational Resources Information Center
Clark, Orvin R.
Arguing that complete, reliable, up-to-date system documentation is critical for every data processing environment, this paper on computer disaster recovery planning begins by discussing the importance of such documentation both for recovering from a systems crash, and for system maintenance and enhancement. The various components of system…
Waste Receiving and Processing (WRAP) Module 1 Hazards Assessment
DOE Office of Scientific and Technical Information (OSTI.GOV)
CAMPBELL, L.R.
1999-09-29
This document establishes the technical basis in support of Emergency Planning activities for the WRAP Module 1 Facility on the Hanford Site. Through this document, the technical basis for the development of facility specific Emergency Action Levels and Emergency Planning Zone is demonstrated.
Cloud computing strategic framework (FY13 - FY15).
DOE Office of Scientific and Technical Information (OSTI.GOV)
Arellano, Lawrence R.; Arroyo, Steven C.; Giese, Gerald J.
This document presents an architectural framework (plan) and roadmap for the implementation of a robust Cloud Computing capability at Sandia National Laboratories. It is intended to be a living document and serve as the basis for detailed implementation plans, project proposals and strategic investment requests.
Tank waste remediation system configuration management plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vann, J.M.
The configuration management program for the Tank Waste Remediation System (TWRS) Project Mission supports management of the project baseline by providing the mechanisms to identify, document, and control the functional and physical characteristics of the products. This document is one of the tools used to develop and control the mission and work. It is an integrated approach for control of technical, cost, schedule, and administrative information necessary to manage the configurations for the TWRS Project Mission. Configuration management focuses on five principal activities: configuration management system management, configuration identification, configuration status accounting, change control, and configuration management assessments. TWRS Projectmore » personnel must execute work in a controlled fashion. Work must be performed by verbatim use of authorized and released technical information and documentation. Application of configuration management will be consistently applied across all TWRS Project activities and assessed accordingly. The Project Hanford Management Contract (PHMC) configuration management requirements are prescribed in HNF-MP-013, Configuration Management Plan (FDH 1997a). This TWRS Configuration Management Plan (CMP) implements those requirements and supersedes the Tank Waste Remediation System Configuration Management Program Plan described in Vann, 1996. HNF-SD-WM-CM-014, Tank Waste Remediation System Configuration Management Implementation Plan (Vann, 1997) will be revised to implement the requirements of this plan. This plan provides the responsibilities, actions and tools necessary to implement the requirements as defined in the above referenced documents.« less
Peterson, Erin L; Carlson, Susan A; Schmid, Thomas L; Brown, David R; Galuska, Deborah A
2018-01-01
The purpose of this study was to examine the association between the presence of supportive community planning documents in US municipalities with design standards and requirements supportive of active living. Cross-sectional study using data from the 2014 National Survey of Community-Based Policy and Environmental Supports for Healthy Eating and Active Living. Nationally representative sample of US municipalities. Respondents are 2005 local officials. Assessed: (1) The presence of design standards and feature requirements and (2) the association between planning documents and design standards and feature requirements supportive of active living in policies for development. Using logistic regression, significant trends were identified in the presence of design standards and feature requirements by plan and number of supportive objectives present. Prevalence of design standards ranged from 19% (developer dedicated right-of-way for bicycle infrastructure development) to 50% (traffic-calming features in areas with high pedestrian and bicycle volume). Features required in policies for development ranged from 14% (short/medium pedestrian-scale block sizes) to 44% (minimum sidewalk widths of 5 feet) of municipalities. As the number of objectives in municipal plans increased, there was a significant and positive trend ( P < .05) in the prevalence of each design standard and requirement. Municipal planning documents containing objectives supportive of physical activity are associated with design standards and feature requirements supportive of activity-friendly communities.
NASA Technical Reports Server (NTRS)
Mallasch, Paul G.
1993-01-01
This volume contains the complete software system documentation for the Federal Communications Commission (FCC) Transponder Loading Data Conversion Software (FIX-FCC). This software was written to facilitate the formatting and conversion of FCC Transponder Occupancy (Loading) Data before it is loaded into the NASA Geosynchronous Satellite Orbital Statistics Database System (GSOSTATS). The information that FCC supplies NASA is in report form and must be converted into a form readable by the database management software used in the GSOSTATS application. Both the User's Guide and Software Maintenance Manual are contained in this document. This volume of documentation passed an independent quality assurance review and certification by the Product Assurance and Security Office of the Planning Research Corporation (PRC). The manuals were reviewed for format, content, and readability. The Software Management and Assurance Program (SMAP) life cycle and documentation standards were used in the development of this document. Accordingly, these standards were used in the review. Refer to the System/Software Test/Product Assurance Report for the Geosynchronous Satellite Orbital Statistics Database System (GSOSTATS) for additional information.
NASA Technical Reports Server (NTRS)
Lange, R. Connor
2012-01-01
Ever since Explorer-1, the United States' first Earth satellite, was developed and launched in 1958, JPL has developed many more spacecraft, including landers and orbiters. While these spacecraft vary greatly in their missions, capabilities,and destination, they all have something in common. All of the components of these spacecraft had to be comprehensively tested. While thorough testing is important to mitigate risk, it is also a very expensive and time consuming process. Thankfully,since virtually all of the software testing procedures for SMAP are computer controlled, these procedures can be automated. Most people testing SMAP flight software (FSW) would only need to write tests that exercise specific requirements and then check the filtered results to verify everything occurred as planned. This gives developers the ability to automatically launch tests on the testbed, distill the resulting logs into only the important information, generate validation documentation, and then deliver the documentation to management. With many of the steps in FSW testing automated, developers can use their limited time more effectively and can validate SMAP FSW modules quicker and test them more rigorously. As a result of the various benefits of automating much of the testing process, management is considering this automated tools use in future FSW validation efforts.
A patient self-assessment tool for cardiac rehabilitation.
Phelan, C; Finnell, M D; Mottla, K A
1989-01-01
A patient self-assessment tool was designed, tested, and implemented to promote cardiac-specific data collection, based on Gordon's Functional Health Patterns, to maximize patient/family involvement in determining a plan of care, and to streamline primary nurses' documentation requirements. Retrospective and concurrent chart reviews provided data for quality assurance monitoring. The results of the monitoring demonstrated that the self-assessment tool markedly improved the patient-specific data base.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Grant, C W; Lenderman, J S; Gansemer, J D
This document is an update to the 'ADIS Algorithm Evaluation Project Plan' specified in the Statement of Work for the US-VISIT Identity Matching Algorithm Evaluation Program, as deliverable II.D.1. The original plan was delivered in August 2010. This document modifies the plan to reflect modified deliverables reflecting delays in obtaining a database refresh. This document describes the revised schedule of the program deliverables. The detailed description of the processes used, the statistical analysis processes and the results of the statistical analysis will be described fully in the program deliverables. The US-VISIT Identity Matching Algorithm Evaluation Program is work performed bymore » Lawrence Livermore National Laboratory (LLNL) under IAA HSHQVT-07-X-00002 P00004 from the Department of Homeland Security (DHS).« less
Timeliness of Care Planning upon Initiation of Chronic Opioid Therapy for Chronic Pain.
Von Korff, Michael; Turner, Judith A; Shortreed, Susan M; Saunders, Kathleen; Rosenberg, Dori; Thielke, Stephen; LeResche, Linda
2016-03-01
Chronic opioid therapy (COT) guidelines recommend developing a COT care plan at the initiation of COT. Assess the timeliness of care planning upon initiation of COT. Observational cohort study in a setting incentivizing and tracking documentation of COT care plans in electronic health records (EHRs). Study participants (N = 896) were aged 45 years or older, had initiated an episode of opioid use within the prior 6 months, and reported regular use of prescription analgesics when screened for a baseline interview about 3 months after an index opioid prescription MEASURES: A timely care plan was defined by an EHR documented care plan prior to or within 4 months after the index opioid prescription. Among COT initiators, 30% had a timely COT care plan documented in the EHR within 4 months following index prescription, while 51% had a documented COT care plan within 12 months following index prescription. Among those interviewed at 1 year follow-up (N = 735), 252 (34.2%) reported opioid use on 7 or more days in the prior 2 weeks. Less than half (45.6%) of the 252 individuals who sustained regular opioid use at 1 year had predicted at baseline that it was somewhat, very, or extremely likely they would be using opioids regularly in 1 year. Patients initiating COT were unlikely to have timely COT care plans. Many who sustained regular opioid use at 1 year had not anticipated using opioids long term. © 2015 American Academy of Pain Medicine. All rights reserved. For permissions, please e-mail: journals.permissions@oup.com.
Tank 241-AZ-102 Privatization Push Mode Core Sampling and Analysis Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
RASMUSSEN, J.H.
1999-08-02
This sampling and analysis plan (SAP) identifies characterization objectives pertaining to sample collection, laboratory analytical evaluation, and reporting requirements for samples obtained from tank 241-AZ-102. The purpose of this sampling event is to obtain information about the characteristics of the contents of 241-AZ-102 required to satisfy the Data Quality Objectives For TWRS Privatization Phase I: Confirm Tank TIS An Appropriate Feed Source For High-Level Waste Feed Batch X(HLW DQO) (Nguyen 1999a), Data Quality Objectives For TWRS Privatization Phase 1: Confirm Tank TIS An Appropriate Feed Source For Low-Activity Waste Feed Batch X (LAW DQO) (Nguyen 1999b), Low Activity Waste andmore » High Level Waste Feed Data Quality Objectives (L&H DQO) (Patello et al. 1999) and Characterization Data Needs for Development, Design, and Operation of Retrieval Equipment Developed through the Data Quality Objective Process (Equipment DQO) (Bloom 1996). The Tank Characterization Technical Sampling Basis document (Brown et al. 1998) indicates that these issues, except the Equipment DQO apply to tank 241-AZ-102 for this sampling event. The Equipment DQO is applied for shear strength measurements of the solids segments only. Poppiti (1999) requires additional americium-241 analyses of the sludge segments. Brown et al. (1998) also identify safety screening, regulatory issues and provision of samples to the Privatization Contractor(s) as applicable issues for this tank. However, these issues will not be addressed via this sampling event. Reynolds et al. (1999) concluded that information from previous sampling events was sufficient to satisfy the safety screening requirements for tank 241 -AZ-102. Push mode core samples will be obtained from risers 15C and 24A to provide sufficient material for the chemical analyses and tests required to satisfy these data quality objectives. The 222-S Laboratory will extrude core samples, composite the liquids and solids, perform chemical analyses, and provide subsamples to the Process Chemistry Laboratory. The Process Chemistry Laboratory will prepare test plans and perform process tests to evaluate the behavior of the 241-AZ-102 waste undergoing the retrieval and treatment scenarios defined in the applicable DQOs. Requirements for analyses of samples originating in the process tests will be documented in the corresponding test plan.« less
ERIC Educational Resources Information Center
Stark Education Partnership, 2011
2011-01-01
This document represents the findings of the Greater Akron and Canton Regional Chambers of Commerce under an Ohio Department of Job and Family Services and Ohio Department of Development Graduate Retention Initiative (GRI) Planning Grant. The document also includes a proposal for the implementation phase of the initiative with a geographic scope…
Bangladesh policy on prevention and control of non-communicable diseases: a policy analysis.
Biswas, Tuhin; Pervin, Sonia; Tanim, Md Imtiaz Alam; Niessen, Louis; Islam, Anwar
2017-06-19
This paper is aimed at critically assessing the extent to which Non-Communicable Disease NCD-related policies introduced in Bangladesh align with the World Health Organization's (WHO) 2013-2020 Action Plan for the Global Strategy for the Prevention and Control of NCDs. The authors reviewed all relevant policy documents introduced by the Government of Bangladesh since its independence in 1971. The literature review targeted scientific and grey literature documents involving internet-based search, and expert consultation and snowballing to identify relevant policy documents. Information was extracted from the documents using a specific matrix, mapping each document against the six objectives of the WHO 2013-2020 Action Plan for the Global Strategy for the Prevention and Control of NCDs. A total of 51 documents were identified. Seven (14%) were research and/or surveys, nine were on established policies (17%), while seventeen (33%) were on action programmes. Five (10%) were related to guidelines and thirteen (25%) were strategic planning documents from government and non-government agencies/institutes. The study covered documents produced by the Government of Bangladesh as well as those by quasi-government and non-government organizations irrespective of the extent to which the intended policies were implemented. The policy analysis findings suggest that although the government has initiated many NCD-related policies or programs, they lacked proper planning, implementation and monitoring. Consequently, Bangladesh over the years had little success in effectively addressing the growing burden of non-communicable diseases. It is imperative that future research critically assess the effectiveness of national NCD policies by monitoring their implementation and level of population coverage.
NASA Technical Reports Server (NTRS)
Ralph, John
1992-01-01
Bergen Cable Technology (BCT) has introduced a new product they refer to as 'safety cable'. This product is intended as a replacement for lockwire when installed per Aerospace Standard (AS) 4536 (included in Appendix D of this document). Installation of safety cable is reportedly faster and more uniform than lockwire. NASA/GSFC proposes to use this safety cable in Shuttle Small Payloads Project (SSPP) applications on upcoming Shuttle missions. To assure that BCT safety cable will provide positive locking of fasteners equivalent to lockwire, the SSPP will conduct vibration and pull tests of the safety cable.
Pentalum SpiDAR Deployment at SWiFT FY17.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Westergaard, Carsten; Pol, Suhas; Pereira, Tassia
2016-12-01
The Texas Tech University ( TTU ) research group is actively studying the wake development of wind turbines, as part of developing innovative wake control strategies to improve the performance of wind farms. Recently, the team received a set of five new gro und lidars to perform field measurements at the Sandia National Laboratories SWiFT site. This document describes tests details including configurations, timeframe, hardware, and the required collaboration from the Sandia team. This test plan will facili tate the coordination between both TTU and the Sandia team in terms of site accessibility, staff training, and data sharing to meetmore » the specific objectives of the tests.« less
Vibro-Acoustic Response of Buildings Due to Sonic Boom Exposure: June 2006 Field Test
NASA Technical Reports Server (NTRS)
Klos, Jacob; Buehrle, Ralph D.
2007-01-01
During the month of June 2006, a series of structural response measurements were made on a house on Edwards Air Force Base (AFB) property that was excited by sonic booms of various amplitudes. Many NASA personnel other than the authors of this report from both Langley Research Center and Dryden Flight Research Center participated in the planning, coordination, execution, and data reduction for the experiment documented in this report. The purpose of this report is to document the measurements that were made, the structure on which they were made, the conditions under which they were made, the sensors and other hardware that were used, and the data that were collected.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Patrick Matthews
2012-10-01
CAU 104 comprises the following corrective action sites (CASs): • 07-23-03, Atmospheric Test Site T-7C • 07-23-04, Atmospheric Test Site T7-1 • 07-23-05, Atmospheric Test Site • 07-23-06, Atmospheric Test Site T7-5a • 07-23-07, Atmospheric Test Site - Dog (T-S) • 07-23-08, Atmospheric Test Site - Baker (T-S) • 07-23-09, Atmospheric Test Site - Charlie (T-S) • 07-23-10, Atmospheric Test Site - Dixie • 07-23-11, Atmospheric Test Site - Dixie • 07-23-12, Atmospheric Test Site - Charlie (Bus) • 07-23-13, Atmospheric Test Site - Baker (Buster) • 07-23-14, Atmospheric Test Site - Ruth • 07-23-15, Atmospheric Test Site T7-4 •more » 07-23-16, Atmospheric Test Site B7-b • 07-23-17, Atmospheric Test Site - Climax These 15 CASs include releases from 30 atmospheric tests conducted in the approximately 1 square mile of CAU 104. Because releases associated with the CASs included in this CAU overlap and are not separate and distinguishable, these CASs are addressed jointly at the CAU level. The purpose of this CADD/CAP is to evaluate potential corrective action alternatives (CAAs), provide the rationale for the selection of recommended CAAs, and provide the plan for implementation of the recommended CAA for CAU 104. Corrective action investigation (CAI) activities were performed from October 4, 2011, through May 3, 2012, as set forth in the CAU 104 Corrective Action Investigation Plan.« less
29 CFR 4050.6 - Payment and required documentation.
Code of Federal Regulations, 2013 CFR
2013-07-01
... MISSING PARTICIPANTS § 4050.6 Payment and required documentation. (a) Time of payment and filing. The plan... administrator and the plan's enrolled actuary) specified in the missing participant forms and instructions, by the time the post-distribution certification is due. Except as otherwise provided in the missing...
29 CFR 4050.6 - Payment and required documentation.
Code of Federal Regulations, 2010 CFR
2010-07-01
... MISSING PARTICIPANTS § 4050.6 Payment and required documentation. (a) Time of payment and filing. The plan... administrator and the plan's enrolled actuary) specified in the missing participant forms and instructions, by the time the post-distribution certification is due. Except as otherwise provided in the missing...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 42 Public Health 5 2011-10-01 2011-10-01 false Health information technology implementation... CERTIFICATION STANDARDS FOR THE ELECTRONIC HEALTH RECORD TECHNOLOGY INCENTIVE PROGRAM Requirements Specific to the Medicaid Program § 495.338 Health information technology implementation advance planning document...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 42 Public Health 5 2012-10-01 2012-10-01 false Health information technology implementation... CERTIFICATION STANDARDS FOR THE ELECTRONIC HEALTH RECORD TECHNOLOGY INCENTIVE PROGRAM Requirements Specific to the Medicaid Program § 495.338 Health information technology implementation advance planning document...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 42 Public Health 5 2014-10-01 2014-10-01 false Health information technology implementation... CERTIFICATION STANDARDS FOR THE ELECTRONIC HEALTH RECORD TECHNOLOGY INCENTIVE PROGRAM Requirements Specific to the Medicaid Program § 495.338 Health information technology implementation advance planning document...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 42 Public Health 5 2013-10-01 2013-10-01 false Health information technology implementation... CERTIFICATION STANDARDS FOR THE ELECTRONIC HEALTH RECORD TECHNOLOGY INCENTIVE PROGRAM Requirements Specific to the Medicaid Program § 495.338 Health information technology implementation advance planning document...
45 CFR 1355.54 - Submittal of advance planning documents.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 45 Public Welfare 4 2014-10-01 2014-10-01 false Submittal of advance planning documents. 1355.54 Section 1355.54 Public Welfare Regulations Relating to Public Welfare (Continued) OFFICE OF HUMAN... FAMILIES, FOSTER CARE MAINTENANCE PAYMENTS, ADOPTION ASSISTANCE, AND CHILD AND FAMILY SERVICES GENERAL...
45 CFR 1355.54 - Submittal of advance planning documents.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 45 Public Welfare 4 2011-10-01 2011-10-01 false Submittal of advance planning documents. 1355.54 Section 1355.54 Public Welfare Regulations Relating to Public Welfare (Continued) OFFICE OF HUMAN... FAMILIES, FOSTER CARE MAINTENANCE PAYMENTS, ADOPTION ASSISTANCE, AND CHILD AND FAMILY SERVICES GENERAL...
45 CFR 1355.54 - Submittal of advance planning documents.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 45 Public Welfare 4 2012-10-01 2012-10-01 false Submittal of advance planning documents. 1355.54 Section 1355.54 Public Welfare Regulations Relating to Public Welfare (Continued) OFFICE OF HUMAN... FAMILIES, FOSTER CARE MAINTENANCE PAYMENTS, ADOPTION ASSISTANCE, AND CHILD AND FAMILY SERVICES GENERAL...
Government Materials on Enrollment Management and Planning in Higher Education: A Resource Guide.
ERIC Educational Resources Information Center
Lewis, David G.
The guide is intended to provide admissions directors, academic deans, institutional planning officers, and faculty with access to government sources of information concerning college enrollment management. Sections provide information on: using the guide; additional government document information sources; using government documents; acquiring…
78 FR 41882 - Airworthiness Directives; Dassault Aviation Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-12
..., Airworthiness Limitations, Revision 18, dated July 2012, of Chapter 5, Maintenance Planning Document, of the... Limitations, Revision 18, dated July 2012, of Chapter 5, Maintenance Planning Document, of the Dassualt Falcon... requirements.'' Under that section, Congress charges the FAA with promoting safe flight of civil aircraft in...
Arizona TeleMedicine Network: Engineering Master Plan.
ERIC Educational Resources Information Center
Atlantic Research Corp., Alexandria, VA.
As the planning document for establishing a statewide health communications system initially servicing the Papago, San Carlos and White Mountain Apache, Navajo, and Hopi reservations, this document prescribes the communications services to be provided by the Arizona TeleMedicine Network. Specifications include: (1) communications services for each…
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 5 2010-10-01 2010-10-01 false Health information technology implementation... CERTIFICATION STANDARDS FOR THE ELECTRONIC HEALTH RECORD TECHNOLOGY INCENTIVE PROGRAM Requirements Specific to the Medicaid Program § 495.338 Health information technology implementation advance planning document...
Test Planning Approach and Lessons
NASA Technical Reports Server (NTRS)
Parkinson, Douglas A.; Brown, Kendall K.
2004-01-01
As NASA began technology risk reduction activities and planning for the next generation launch vehicle under the Space Launch Initiative (SLI), now the Next Generation Launch Technology (NGLT) Program, a review of past large liquid rocket engine development programs was performed. The intent of the review was to identify any significant lessons from the development testing programs that could be applied to current and future engine development programs. Because the primary prototype engine in design at the time of this study was the Boeing-Rocketdyne RS-84, the study was slightly biased towards LOX/RP-1 liquid propellant engines. However, the significant lessons identified are universal. It is anticipated that these lessons will serve as a reference for test planning in the Engine Systems Group at Marshall Space Flight Center (MSFC). Towards the end of F-1 and J-2 engine development testing, NASA/MSFC asked Rocketdyne to review those test programs. The result was a document titled, Study to Accelerate Development by Test of a Rocket Engine (R-8099). The "intent (of this study) is to apply this thinking and learning to more efficiently develop rocket engines to high reliability with improved cost effectivenes" Additionally, several other engine programs were reviewed - such as SSME, NSTS, STME, MC-1, and RS-83- to support or refute the R-8099. R-8099 revealed two primary lessons for test planning, which were supported by the other engine development programs. First, engine development programs can benefit from arranging the test program for engine system testing as early as feasible. The best test for determining environments is at the system level, the closest to the operational flight environment. Secondly, the component testing, which tends to be elaborate, should instead be geared towards reducing risk to enable system test. Technical risk can be reduced at the component level, but the design can only be truly verified and validated after engine system testing.
Genesis Contingency Planning and Mishap Recovery: The Sample Curation View
NASA Technical Reports Server (NTRS)
Stansbery, E. K.; Allton, J. H.; Allen, C. C.; McNamara, K. M.; Calaway, M.; Rodriques, M. C.
2007-01-01
Planning for sample preservation and curation was part of mission design from the beginning. One of the scientific objectives for Genesis included collecting samples of three regimes of the solar wind in addition to collecting bulk solar wind during the mission. Collectors were fabricated in different thicknesses for each regime of the solar wind and attached to separate frames exposed to the solar wind during specific periods of solar activity associated with each regime. The original plan to determine the solar regime sampled for specific collectors was to identify to which frame the collector was attached. However, the collectors were dislodged during the hard landing making identification by frame attachment impossible. Because regimes were also identified by thickness of the collector, the regime sampled is identified by measuring fragment thickness. A variety of collector materials and thin films applied to substrates were selected and qualified for flight. This diversity provided elemental measurement in more than one material, mitigating effects of diffusion rates and/or radiation damage. It also mitigated against different material and substrate strengths resulting in differing effects of the hard landing. For example, silicon crystal substrates broke into smaller fragments than sapphire-based substrates and diamond surfaces were more resilient to flying debris damage than gold. The primary responsibility of the curation team for recovery was process documentation. Contingency planning for the recovery phase expanded this responsibility to include not only equipment to document, but also gather, contain and identify samples from the landing area and the recovered spacecraft. The team developed contingency plans for various scenarios as part of mission planning that included topographic maps to aid in site recovery and identification of different modes of transport and purge capability depending on damage. A clean tent, set-up at Utah Test & Training Range to control the environment for processing the sample return capsule and cleanly installing a nitrogen purge to the canister, was used to control the environment for extracting collector fragments from the damaged canister and to document and package over 10,000 collector fragments.
Sudore, Rebecca L; Boscardin, John; Feuz, Mariko A; McMahan, Ryan D; Katen, Mary T; Barnes, Deborah E
2017-08-01
Documentation rates of patients' medical wishes are often low. It is unknown whether easy-to-use, patient-facing advance care planning (ACP) interventions can overcome barriers to planning in busy primary care settings. To compare the efficacy of an interactive, patient-centered ACP website (PREPARE) with an easy-to-read advance directive (AD) to increase planning documentation. This was a comparative effectiveness randomized clinical trial from April 2013 to July 2016 conducted at multiple primary care clinics at the San Francisco VA Medical Center. Inclusion criteria were age of a least 60 years; at least 2 chronic and/or serious conditions; and 2 or more primary care visits; and 2 or more additional clinic, hospital, or emergency room visits in the last year. Participants were randomized to review PREPARE plus an easy-to-read AD or the AD alone. There were no clinician and/or system-level interventions or education. Research staff were blinded for all follow-up measurements. The primary outcome was new ACP documentation (ie, legal forms and/or discussions) at 9 months. Secondary outcomes included patient-reported ACP engagement at 1 week, 3 months, and 6 months using validated surveys of behavior change process measures (ie, 5-point knowledge, self-efficacy, readiness scales) and action measures (eg, surrogate designation, using a 0-25 scale). We used intention-to-treat, mixed-effects logistic and linear regression, controlling for time, health literacy, race/ethnicity, baseline ACP, and clustering by physician. The mean (SD) age of 414 participants was 71 (8) years, 38 (9%) were women, 83 (20%) had limited literacy, and 179 (43%) were nonwhite. No participant characteristic differed significantly among study arms at baseline. Retention at 6 months was 90%. Advance care planning documentation 6 months after enrollment was higher in the PREPARE arm vs the AD-alone arm (adjusted 35% vs 25%; odds ratio, 1.61 [95% CI, 1.03-2.51]; P = .04). PREPARE also resulted in higher self-reported ACP engagement at each follow-up, including higher process and action scores; P <.001 at each follow-up). Easy-to-use, patient-facing ACP tools, without clinician- and/or system-level interventions, can increase planning documentation 25% to 35%. Combining the PREPARE website with an easy-to-read AD resulted in higher planning documentation than the AD alone, suggesting that PREPARE may increase planning documentation with minimal health care system resources. clinicaltrials.gov Identifier: NCT01550731.
A CMMI-based approach for medical software project life cycle study.
Chen, Jui-Jen; Su, Wu-Chen; Wang, Pei-Wen; Yen, Hung-Chi
2013-01-01
In terms of medical techniques, Taiwan has gained international recognition in recent years. However, the medical information system industry in Taiwan is still at a developing stage compared with the software industries in other nations. In addition, systematic development processes are indispensable elements of software development. They can help developers increase their productivity and efficiency and also avoid unnecessary risks arising during the development process. Thus, this paper presents an application of Light-Weight Capability Maturity Model Integration (LW-CMMI) to Chang Gung Medical Research Project (CMRP) in the Nuclear medicine field. This application was intended to integrate user requirements, system design and testing of software development processes into three layers (Domain, Concept and Instance) model. Then, expressing in structural System Modeling Language (SysML) diagrams and converts part of the manual effort necessary for project management maintenance into computational effort, for example: (semi-) automatic delivery of traceability management. In this application, it supports establishing artifacts of "requirement specification document", "project execution plan document", "system design document" and "system test document", and can deliver a prototype of lightweight project management tool on the Nuclear Medicine software project. The results of this application can be a reference for other medical institutions in developing medical information systems and support of project management to achieve the aim of patient safety.
Public health human resources: a comparative analysis of policy documents in two Canadian provinces
2014-01-01
Background Amidst concerns regarding the capacity of the public health system to respond rapidly and appropriately to threats such as pandemics and terrorism, along with changing population health needs, governments have focused on strengthening public health systems. A key factor in a robust public health system is its workforce. As part of a nationally funded study of public health renewal in Canada, a policy analysis was conducted to compare public health human resources-relevant documents in two Canadian provinces, British Columbia (BC) and Ontario (ON), as they each implement public health renewal activities. Methods A content analysis of policy and planning documents from government and public health-related organizations was conducted by a research team comprised of academics and government decision-makers. Documents published between 2003 and 2011 were accessed (BC = 27; ON = 20); documents were either publicly available or internal to government and excerpted with permission. Documentary texts were deductively coded using a coding template developed by the researchers based on key health human resources concepts derived from two national policy documents. Results Documents in both provinces highlighted the importance of public health human resources planning and policies; this was particularly evident in early post-SARS documents. Key thematic areas of public health human resources identified were: education, training, and competencies; capacity; supply; intersectoral collaboration; leadership; public health planning context; and priority populations. Policy documents in both provinces discussed the importance of an educated, competent public health workforce with the appropriate skills and competencies for the effective and efficient delivery of public health services. Conclusion This policy analysis identified progressive work on public health human resources policy and planning with early documents providing an inventory of issues to be addressed and later documents providing evidence of beginning policy development and implementation. While many similarities exist between the provinces, the context distinctive to each province has influenced and shaped how they have focused their public health human resources policies. PMID:24564931
Public health human resources: a comparative analysis of policy documents in two Canadian provinces.
Regan, Sandra; MacDonald, Marjorie; Allan, Diane E; Martin, Cheryl; Peroff-Johnston, Nancy
2014-02-24
Amidst concerns regarding the capacity of the public health system to respond rapidly and appropriately to threats such as pandemics and terrorism, along with changing population health needs, governments have focused on strengthening public health systems. A key factor in a robust public health system is its workforce. As part of a nationally funded study of public health renewal in Canada, a policy analysis was conducted to compare public health human resources-relevant documents in two Canadian provinces, British Columbia (BC) and Ontario (ON), as they each implement public health renewal activities. A content analysis of policy and planning documents from government and public health-related organizations was conducted by a research team comprised of academics and government decision-makers. Documents published between 2003 and 2011 were accessed (BC = 27; ON = 20); documents were either publicly available or internal to government and excerpted with permission. Documentary texts were deductively coded using a coding template developed by the researchers based on key health human resources concepts derived from two national policy documents. Documents in both provinces highlighted the importance of public health human resources planning and policies; this was particularly evident in early post-SARS documents. Key thematic areas of public health human resources identified were: education, training, and competencies; capacity; supply; intersectoral collaboration; leadership; public health planning context; and priority populations. Policy documents in both provinces discussed the importance of an educated, competent public health workforce with the appropriate skills and competencies for the effective and efficient delivery of public health services. This policy analysis identified progressive work on public health human resources policy and planning with early documents providing an inventory of issues to be addressed and later documents providing evidence of beginning policy development and implementation. While many similarities exist between the provinces, the context distinctive to each province has influenced and shaped how they have focused their public health human resources policies.
Administrator's Guide to Technology: Planning, Funding & Implementation.
ERIC Educational Resources Information Center
Aspen Education Development Group, Gaithersburg, MD.
This document provides guidelines for administrators related to instructional technology and planning. Chapter 1 discusses planning, including developing a technology plan, facility assessment, e-rate planning, formation of a technology committee, budget planning, and hardware/software replacement plan and costs. Chapter 2 addresses…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Im, Piljae; Bhandari, Mahabir S.; New, Joshua Ryan
This document describes the Oak Ridge National Laboratory (ORNL) multiyear experimental plan for validation and uncertainty characterization of whole-building energy simulation for a multi-zone research facility using a traditional rooftop unit (RTU) as a baseline heating, ventilating, and air conditioning (HVAC) system. The project’s overarching objective is to increase the accuracy of energy simulation tools by enabling empirical validation of key inputs and algorithms. Doing so is required to inform the design of increasingly integrated building systems and to enable accountability for performance gaps between design and operation of a building. The project will produce documented data sets that canmore » be used to validate key functionality in different energy simulation tools and to identify errors and inadequate assumptions in simulation engines so that developers can correct them. ASHRAE Standard 140, Method of Test for the Evaluation of Building Energy Analysis Computer Programs (ASHRAE 2004), currently consists primarily of tests to compare different simulation programs with one another. This project will generate sets of measured data to enable empirical validation, incorporate these test data sets in an extended version of Standard 140, and apply these tests to the Department of Energy’s (DOE) EnergyPlus software (EnergyPlus 2016) to initiate the correction of any significant deficiencies. The fitness-for-purpose of the key algorithms in EnergyPlus will be established and demonstrated, and vendors of other simulation programs will be able to demonstrate the validity of their products. The data set will be equally applicable to validation of other simulation engines as well.« less
NASA Technical Reports Server (NTRS)
Helfrich, Cliff; Berry, David S.; Bhat, Ramachandra; Border, James; Graat, Eric; Halsell, Allen; Kruizinga, Gerhard; Lau, Eunice; Mottinger, Neil; Rush, Brian;
2015-01-01
In late 2013, the Indian Space Research Organization (ISRO) launched its "Mars Orbiter Mission" (MOM). ISRO engaged NASA's Jet Propulsion Laboratory (JPL) for navigation services to support ISRO's objectives of MOM achieving and maintaining Mars orbit. The navigation support included planning, documentation, testing, orbit determination, maneuver design /analysis, and tracking data analysis. Several of MOM's attributes had an impact on navigation processes, e.g., S -band telecommunications, Earth Orbit Phase maneuvers, and frequent angular momentum desaturation s (AMDs). The primary source of tracking data was NASA/ JPL's Deep Space Network (DSN); JPL also conducted a performance assessment of Indian Deep Space Network (IDSN) tracking data. Planning for the Mars Orbit Insertion (MOI) was complicated by a pressure regulator failure that created uncertainty regarding MOM's main engine and raised potential planetary protection issues. A successful main engine test late on approach resolved these issues; it was quickly followed by a successful MOI on 24-September - 2014 at 02:00 UTC. Less than a month later, Comet Siding Spring's Mars flyby necessitated plans to minimize potential spacecraft damage. At the time of this writing, MOM's orbital operations continue, and plans to extend JPL 's support are in progress. This paper covers the JPL 's support of MOM through the Comet Siding Spring event.
40 CFR 35.2050 - Effect of approval or certification of documents.
Code of Federal Regulations, 2010 CFR
2010-07-01
... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2050 Effect of approval or certification of documents. Review or approval of facilities plans, design drawings... relieve the grantee of its responsibility to properly plan, design, build and effectively operate and...
NASA Technical Reports Server (NTRS)
Palguta, T.; Bradley, W.; Stockton, T.
1988-01-01
Guidance in preparing and updating an integrated logistics support plan (ILSP) is given. Clear, concise, and detailed instructions are provided on the preparation and content of an ILSP in order to ensure a quality document that reflects total program requirements.
IPPF Co-operative Information Service (ICIS). February 1978.
ERIC Educational Resources Information Center
International Planned Parenthood Federation, London (England).
This publication is a catalogue of document descriptions that may be of use to national family planning/population organizations. The International Planned Parenthood Federation (IPPF) Cooperative Information Service (ICIS) has developed this quarterly series as a service to population documentation centers so that these centers can acquire the…
Prostate Dose Escalation by Innovative Inverse Planning-Driven IMRT
2005-11-01
Galvin, J. M.; Low, D.; Palta , J. R.; Rosen, I.; Sharpe, M. B.; Xia, P.; Xiao, Y.; Xing, L.; Yu, C. X., Guidance document on delivery, treatment planning... Palta , J., Implementing IMRT in clinical practice: ajoint document of the American Society for Therapeutic Radiology and Oncology and the American
45 CFR 307.15 - Approval of advance planning documents for computerized support enforcement systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
... computerized support enforcement systems. 307.15 Section 307.15 Public Welfare Regulations Relating to Public... CHILDREN AND FAMILIES, DEPARTMENT OF HEALTH AND HUMAN SERVICES COMPUTERIZED SUPPORT ENFORCEMENT SYSTEMS § 307.15 Approval of advance planning documents for computerized support enforcement systems. (a...
Environmental Scan: A Strategic Planning Document.
ERIC Educational Resources Information Center
Osborn, Frances
Information, perceptions, and predictions from a variety of sources are brought together in this document to help guide planning and decision making at Monroe Community College (MCC). The first section examines national events and trends with implications for the future of MCC, including employment projections; educational norms; data on community…
Comprehensive Planning Resource Document, 1990-91, for the Kern Community College District.
ERIC Educational Resources Information Center
Cook, Lauraine
This compilation of resources for district planning in 1990-91 provides an overview of demographic, personnel, financial, facilities, and curriculum issues for the Kern Community College District (California) and its member institutions, Bakersfield, Cerro Coso, and Porterville colleges. The 10 sections of the document cover: (1) General…
ERIC Educational Resources Information Center
Kirchner, Charles, Ed.
This document identifies the information that should be included in a business plan, and in what order, to make it an effective management tool and an effective tool to communicate a proposed or existing company's strengths and potential to potential financiers. Following an introduction, the document explains the following sections of a business…
ERIC Educational Resources Information Center
Lobo, Rosale Constance
2017-01-01
Registered Nurses use clinical documentation to describe care planning processes, measure quality outcomes, support reimbursement, and defend litigation. The Connecticut Department of Health, guided by federal Conditions of Participation, defines state-level healthcare policy to include required care planning processes. Nurses are educated in care…
NOAA Office of Exploration and Research > Education > NOAA Initiatives
Organization Guiding Documents Organizational Structure Map of Staff and Affiliate Locations Strategic Plan Evaluation Education NOAA Initiatives Home About OER Overview Organization Guiding Documents Organizational Structure Map of Staff and Affiliate Locations Strategic Plan 2014 Funding Opportunities Contact Us Program
NOAA Office of Exploration and Research > Education > Alliance Partners
Organization Guiding Documents Organizational Structure Map of Staff and Affiliate Locations Strategic Plan Evaluation Education Alliance Partners Home About OER Overview Organization Guiding Documents Organizational Structure Map of Staff and Affiliate Locations Strategic Plan 2014 Funding Opportunities Contact Us Program
78 FR 64970 - New Deadlines for Public Comment on Draft Environmental Documents
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-30
... interested parties to contact Service personnel and Web sites for information about these draft documents. As..., fdsys/pkg/FR-2013- CO; Comprehensive Conservation 08-07/pdf/2013- Plan and Environmental Impact 19052.pdf. Statement; Two Ponds National Wildlife Refuge, Arvada, CO; Comprehensive Conservation Plan and...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Honma, George
The establishment of a systematic process for the evaluation of historic technology information for use in advanced reactor licensing is described. Efforts are underway to recover and preserve Experimental Breeder Reactor II and Fast Flux Test Facility historical data. These efforts have generally emphasized preserving information from data-acquisition systems and hard-copy reports and entering it into modern electronic formats suitable for data retrieval and examination. The guidance contained in this document has been developed to facilitate consistent and systematic evaluation processes relating to quality attributes of historic technical information (with focus on sodium-cooled fast reactor (SFR) technology) that will bemore » used to eventually support licensing of advanced reactor designs. The historical information may include, but is not limited to, design documents for SFRs, research-and-development (R&D) data and associated documents, test plans and associated protocols, operations and test data, international research data, technical reports, and information associated with past U.S. Nuclear Regulatory Commission (NRC) reviews of SFR designs. The evaluation process is prescribed in terms of SFR technology, but the process can be used to evaluate historical information for any type of advanced reactor technology. An appendix provides a discussion of typical issues that should be considered when evaluating and qualifying historical information for advanced reactor technology fuel and source terms, based on current light water reactor (LWR) requirements and recent experience gained from Next Generation Nuclear Plant (NGNP).« less
Data Quality Objectives for Tank Farms Waste Compatibility Program
DOE Office of Scientific and Technical Information (OSTI.GOV)
BANNING, D.L.
1999-07-02
There are 177 waste storage tanks containing over 210,000 m{sup 3} (55 million gal) of mixed waste at the Hanford Site. The River Protection Project (RPP) has adopted the data quality objective (DQO) process used by the U.S. Environmental Protection Agency (EPA) (EPA 1994a) and implemented by RPP internal procedure (Banning 1999a) to identify the information and data needed to address safety issues. This DQO document is based on several documents that provide the technical basis for inputs and decision/action levels used to develop the decision rules that evaluate the transfer of wastes. A number of these documents are presentlymore » in the process of being revised. This document will need to be revised if there are changes to the technical criteria in these supporting documents. This DQO process supports various documents, such as sampling and analysis plans and double-shell tank (DST) waste analysis plans. This document identifies the type, quality, and quantity of data needed to determine whether transfer of supernatant can be performed safely. The requirements in this document are designed to prevent the mixing of incompatible waste as defined in Washington Administrative Code (WAC) 173-303-040. Waste transfers which meet the requirements contained in this document and the Double-Shell Tank Waste Analysis Plan (Mulkey 1998) are considered to be compatible, and prevent the mixing of incompatible waste.« less