Generator Set Environmental and Stability Testing
2015-03-01
UNCLASSIFIED GENERATOR SET ENVIRONMENTAL AND STABILITY TESTING INTERIM REPORT TFLRF No. 460 by Gregory A. Hansen Edwin A...it to the originator. UNCLASSIFIED GENERATOR SET ENVIRONMENTAL AND STABILITY TESTING INTERIM REPORT TFLRF No. 460 by...TITLE AND SUBTITLE Generator Set Environmental and Stability Testing 5a. CONTRACT NUMBER W56HZV-09-C-0100 5b. GRANT NUMBER 5c. PROGRAM
U.S. Aeronautical L-Band Satellite Technology Test Program : Interim Tests Results
DOT National Transportation Integrated Search
1975-06-01
The U.S. Aeronautical L-Band satellite test program was performed between September 1974 and April 1975 as part of an international ATS-6 L-Band satellite test program. The U.S. program consisted of both technology and ATC communications demonstratio...
Under Project No. WP-1538 of the Strategic Environmental Research and Development Program, the U. S. Air Force's Arnold Engineering Development Center (AEDC) is developing an interim test method for non-volatile particulate matter (PM) specifically for the Joint Strike Fighter (J...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-27
... 2105-AE13 Procedures for Transportation Workplace Drug and Alcohol Testing Programs: Federal Drug...) published an interim final rule (IFR) authorizing the use of a new Federal Drug Testing Custody and Control Form (CCF) in its drug testing program. Use of the form is authorized beginning October 1, 2010. This...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Truex, Michael J.; Strickland, Christopher E.; Oostrom, Martinus
A field test of desiccation is being conducted as an element of the Deep Vadose Zone Treatability Test Program. The active desiccation portion of the test has been completed. Monitoring data have been collected at the field test site during the post-desiccation period and are reported herein. This is an interim data summary report that includes about 4 years of post-desiccation monitoring data. The DOE field test plan proscribes a total of 5 years of post-desiccation monitoring.
A randomized controlled trial of interim methadone maintenance.
Schwartz, Robert P; Highfield, David A; Jaffe, Jerome H; Brady, Joseph V; Butler, Carol B; Rouse, Charles O; Callaman, Jason M; O'Grady, Kevin E; Battjes, Robert J
2006-01-01
Effective alternatives to long waiting lists for entry into methadone hydrochloride maintenance treatment are needed to reduce the complications of continuing heroin dependence and to increase methadone treatment entry. To compare the effectiveness of interim methadone maintenance with that of the usual waiting list condition in facilitating methadone treatment entry and reducing heroin and cocaine use and criminal behavior. Randomized, controlled, clinical trial using 2 conditions, with treatment assignment on a 3:2 basis to interim maintenance-waiting list control. A methadone treatment program in Baltimore. A total of 319 individuals meeting the criteria for current heroin dependence and methadone maintenance treatment. Participants were randomly assigned to either interim methadone maintenance, consisting of an individually determined methadone dose and emergency counseling only for up to 120 days, or referral to community-based methadone treatment programs. Entry into comprehensive methadone maintenance therapy at 4 months from baseline; self-reported days of heroin use, cocaine use, and criminal behavior; and number of urine drug test results positive for heroin and cocaine at the follow-up interview conducted at time of entry into comprehensive methadone treatment (or at 4 months from baseline for participants who did not enter regular treatment). Significantly more participants assigned to the interim methadone maintenance condition entered comprehensive methadone maintenance treatment by the 120th day from baseline (75.9%) than those assigned to the waiting list control condition (20.8%) (P<.001). Overall, in the past 30 days at follow-up, interim participants reported significantly fewer days of heroin use (P<.001), had a significant reduction in heroin-positive drug test results (P<.001), reported spending less money on drugs (P<.001), and received less illegal income (P<.02) than the waiting list participants. Interim methadone maintenance results in a substantial increase in the likelihood of entry into comprehensive treatment, and is an effective means of reducing heroin use and criminal behavior among opioid-dependent individuals awaiting entry into a comprehensive methadone treatment program.
76 FR 72332 - Energy Conservation Program: Test Procedure for Microwave Ovens
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-23
... Energy Conservation Program: Test Procedure for Microwave Ovens AGENCY: Office of Energy Efficiency and.... Department of Energy (DOE) published an interim final rule on March 9, 2011, amending its test procedures for... standby mode and off mode power use by microwave ovens. Those amendments incorporated into the DOE test...
16 CFR 1209.33 - Reasonable testing program.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 1209.33 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION CONSUMER PRODUCT SAFETY ACT REGULATIONS INTERIM SAFETY STANDARD FOR CELLULOSE INSULATION Certification § 1209.33 Reasonable testing program. (a) General. Section 14(a) of the Consumer Product Safety Act (15 U.S.C. 2063(a)) requires each manufacturer...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-26
... Electronics America, Inc. From the Department of Energy Residential Refrigerator and Refrigerator-Freezer Test... Electronics America, Inc. (Samsung) from energy efficiency test procedure requirements that are applicable to...
Polymer concrete overlay test program : interim report.
DOT National Transportation Integrated Search
1974-11-01
This report describes work done on various combinations of monomers and polymer concrete mixes and identifies the mixes showing the greatest potential for use in bridge deck overlays . Presented are test results showing physical properties of various...
Results from the interim salt disposition program macrobatch 10 tank 21H qualification samples
DOE Office of Scientific and Technical Information (OSTI.GOV)
Peters, T. B.; Bannochie, C. J.
2017-02-23
Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Macrobatch (Salt Batch) 10 for the Interim Salt Disposition Program (ISDP). This document reports characterization data on the samples of Tank 21H and fulfills the requirements of Deliverable 3 of the Technical Task Request (TTR). Further work will report the results of the Extraction-Scrub-Strip (ESS) testing (Task 5 of the TTR) using the Tank 21H material. Task 4 of the TTR (MST Strike) will not be completed for Salt Batch 10.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Truex, Michael J.; Oostrom, Martinus; Strickland, Christopher E.
2013-09-01
A field test of desiccation is being conducted as an element of the deep vadose zone treatability test program. Desiccation technology relies on removal of water from a portion of the subsurface such that the resultant low moisture conditions inhibit downward movement of water and dissolved contaminants. Previously, a field test report (Truex et al. 2012a) was prepared describing the active desiccation portion of the test and initial post-desiccation monitoring data. Additional monitoring data have been collected at the field test site during the post-desiccation period and is reported herein along with interpretation with respect to desiccation performance. This ismore » an interim report including about 2 years of post-desiccation monitoring data.« less
Code of Federal Regulations, 2014 CFR
2014-04-01
... 25 Indians 1 2014-04-01 2014-04-01 false Interim fiscal year 1980 and fiscal year 1981 funding for pre-kindergarten programs previously funded by the Bureau. 39.1100 Section 39.1100 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR EDUCATION THE INDIAN SCHOOL EQUALIZATION PROGRAM Pre-kindergarten Programs § 39.1100 Interim fiscal year...
Code of Federal Regulations, 2012 CFR
2012-04-01
... 25 Indians 1 2012-04-01 2011-04-01 true Interim fiscal year 1980 and fiscal year 1981 funding for pre-kindergarten programs previously funded by the Bureau. 39.1100 Section 39.1100 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR EDUCATION THE INDIAN SCHOOL EQUALIZATION PROGRAM Pre-kindergarten Programs § 39.1100 Interim fiscal year...
Code of Federal Regulations, 2010 CFR
2010-04-01
... 25 Indians 1 2010-04-01 2010-04-01 false Interim fiscal year 1980 and fiscal year 1981 funding for pre-kindergarten programs previously funded by the Bureau. 39.1100 Section 39.1100 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR EDUCATION THE INDIAN SCHOOL EQUALIZATION PROGRAM Pre-kindergarten Programs § 39.1100 Interim fiscal year...
Code of Federal Regulations, 2013 CFR
2013-04-01
... 25 Indians 1 2013-04-01 2013-04-01 false Interim fiscal year 1980 and fiscal year 1981 funding for pre-kindergarten programs previously funded by the Bureau. 39.1100 Section 39.1100 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR EDUCATION THE INDIAN SCHOOL EQUALIZATION PROGRAM Pre-kindergarten Programs § 39.1100 Interim fiscal year...
Code of Federal Regulations, 2011 CFR
2011-04-01
... 25 Indians 1 2011-04-01 2011-04-01 false Interim fiscal year 1980 and fiscal year 1981 funding for pre-kindergarten programs previously funded by the Bureau. 39.1100 Section 39.1100 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR EDUCATION THE INDIAN SCHOOL EQUALIZATION PROGRAM Pre-kindergarten Programs § 39.1100 Interim fiscal year...
40 CFR 80.141 - Interim detergent gasoline program.
Code of Federal Regulations, 2010 CFR
2010-07-01
... considered acceptable for demonstration of IVD control performance. Examples of acceptable test procedures... carburetor deposits. Examples of acceptable test procedures for demonstration of carburetor deposit control... ultimate consumer; (ii) All additized post-refinery component (PRC); and (iii) All detergent additives sold...
40 CFR 80.141 - Interim detergent gasoline program.
Code of Federal Regulations, 2011 CFR
2011-07-01
... considered acceptable for demonstration of IVD control performance. Examples of acceptable test procedures... carburetor deposits. Examples of acceptable test procedures for demonstration of carburetor deposit control... ultimate consumer; (ii) All additized post-refinery component (PRC); and (iii) All detergent additives sold...
40 CFR 80.141 - Interim detergent gasoline program.
Code of Federal Regulations, 2012 CFR
2012-07-01
... considered acceptable for demonstration of IVD control performance. Examples of acceptable test procedures... carburetor deposits. Examples of acceptable test procedures for demonstration of carburetor deposit control... ultimate consumer; (ii) All additized post-refinery component (PRC); and (iii) All detergent additives sold...
40 CFR 80.141 - Interim detergent gasoline program.
Code of Federal Regulations, 2013 CFR
2013-07-01
... considered acceptable for demonstration of IVD control performance. Examples of acceptable test procedures... carburetor deposits. Examples of acceptable test procedures for demonstration of carburetor deposit control... ultimate consumer; (ii) All additized post-refinery component (PRC); and (iii) All detergent additives sold...
1982-05-07
The State of Florida has applied for interim Authorization Phase I. EPA has reviewed Florida's application for Phase I and has determined that Florida's hazardous waste program is substantially equivalent to the Federal program covered by Phase I. The State of Florida is, hereby, granted Interim Authorization for Phase I to operate the State 's hazardous waste program, in lieu of the Federal program.
Tests of 38 Ball-Bearing Greases
NASA Technical Reports Server (NTRS)
Mcmurtrey, E. L.
1982-01-01
Report presents interim results in program of long-term tests of ball-bearing greases in vacuum, oxidizing, and otherwise hostile environment. Program is motivated by need for mechanisms that will operate for long periods in spacecraft or space stations. Class of lubricants based on perfluoroalkylpolyether (PFPE) with fluorotelomer thickeners has given best results in vacuum tests completed thus far. Test methods and performances of various lubricants could be of interest in automotive and industrial communities.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Peters, T.
2016-02-23
Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Macrobatch (Salt Batch) 9 for the Interim Salt Disposition Program (ISDP). The Salt Batch 9 characterization results were previously reported. An Extraction-Scrub-Strip (ESS) test was performed to determine cesium distribution ratios (D (Cs)) and cesium concentration in the strip effluent and decontaminated salt solution (DSS) streams; this data will be used by Tank Farm Engineering to project a cesium decontamination factor (DF). This test used actual Tank 21H material, and a blend solvent prepared by SRNL that mimics the solvent composition currently being used atmore » the Modular Caustic-Side Solvent Extraction Unit (MCU). The ESS test showed acceptable performance with an extraction D (Cs) value of 52.4. This value is consistent with results from previous salt batch ESS tests using similar solvent formulations. This compares well against the predicted value of 56.5 from a recently created D (Cs) model« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Peters, T. B.
Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Macrobatch (Salt Batch) 10 for the Interim Salt Disposition Program (ISDP). The Salt Batch 10 characterization results were previously reported.ii,iii An Extraction, -Scrub, -Strip (ESS) test was performed to determine cesium distribution ratios (D(Cs)) and cesium concentration in the strip effluent (SE) and decontaminated salt solution (DSS) streams; this data will be used by Tank Farm Engineering to project a cesium decontamination factor (DF). This test used actual Tank 21H material, and a sample of the NGS Blend solvent currently being used at the Modularmore » Caustic-Side Solvent Extraction Unit (MCU). The ESS test showed acceptable performance with an extraction D(Cs) value of 110. This value is consistent with results from previous salt batch ESS tests using similar solvent formulations. This is better than the predicted value of 39.8 from a recently created D(Cs) model.« less
76 FR 74834 - Interim Staff Guidance on Aging Management Program for Steam Generators
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-01
... NRC staff's evaluation of the suitability of using Revision 3 of the Nuclear Energy Institute's (NEI... NUCLEAR REGULATORY COMMISSION [NRC-2011-0228] Interim Staff Guidance on Aging Management Program for Steam Generators AGENCY: Nuclear Regulatory Commission. ACTION: Interim staff guidance; issuance...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-05
... Conservation Program: Availability of the Interim Technical Support Document for High-Intensity Discharge Lamps... high-intensity discharge (HID) lamps energy conservation standards in the Federal Register. This... interim analysis for high- intensity discharge lamps energy conservation standards. The notice provided...
JT9D ceramic outer air seal system refinement program
NASA Technical Reports Server (NTRS)
Gaffin, W. O.
1982-01-01
The abradability and durability characteristics of the plasma sprayed system were improved by refinement and optimization of the plasma spray process and the metal substrate design. The acceptability of the final seal system for engine testing was demonstrated by an extensive rig test program which included thermal shock tolerance, thermal gradient, thermal cycle, erosion, and abradability tests. An interim seal system design was also subjected to 2500 endurance test cycles in a JT9D-7 engine.
The development of an interim generalized gate logic software simulator
NASA Technical Reports Server (NTRS)
Mcgough, J. G.; Nemeroff, S.
1985-01-01
A proof-of-concept computer program called IGGLOSS (Interim Generalized Gate Logic Software Simulator) was developed and is discussed. The simulator engine was designed to perform stochastic estimation of self test coverage (fault-detection latency times) of digital computers or systems. A major attribute of the IGGLOSS is its high-speed simulation: 9.5 x 1,000,000 gates/cpu sec for nonfaulted circuits and 4.4 x 1,000,000 gates/cpu sec for faulted circuits on a VAX 11/780 host computer.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-17
... Verification Services Inc. as a Nationally Recognized Certification Program for Small Electric Motors AGENCY... conservation requirements for, among other things, electric motors and small electric motors, including test...\\ Section 345(c) of EPCA directs the Secretary of Energy to require manufacturers of electric motors ``to...
Faculty and Student Views of the Interim Term
ERIC Educational Resources Information Center
Centra, John A.; Sobol, Marion G.
1974-01-01
Evaluations of the interim term or 4-1-4 program at various colleges have been generally favorable. A detailed evaluation of the Rider College interim study program based on faculty and student reports indicated that the more nontraditionally oriented courses were rated higher than the more traditional offerings. (Editor/PG)
NASA Technical Reports Server (NTRS)
Wolfe, R. R.
1975-01-01
Space servicing automated payloads was studied for potential cost benefits for future payload operations. Background information is provided on space servicing in general, and on a pilot flight test program in particular. An fight test is recommended to demonstrate space servicing. An overall program plan is provided which builds upon the pilot program through an interim servicing capability. A multipayload servicing concept for the time when the full capability tug becomes operational is presented. The space test program is specifically designed to provide low-cost booster vehicles and a flight test platform for several experiments on a single flight.
French Interim MALE UAV Program
2003-09-02
MINISTÈRE DE LA DÉFENSE June, 13th 2002 Lcl Monsterleet FAF Staff J. Caron EADS S&DE-ISR FRENCH INTERIM MALE UAV PROGRAM 4 INDUSTRIAL STATUS Report...2003 2. REPORT TYPE N/A 3. DATES COVERED - 4. TITLE AND SUBTITLE French Interim Male UAV Program 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c...PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) EADS
Interim analysis: A rational approach of decision making in clinical trial.
Kumar, Amal; Chakraborty, Bhaswat S
2016-01-01
Interim analysis of especially sizeable trials keeps the decision process free of conflict of interest while considering cost, resources, and meaningfulness of the project. Whenever necessary, such interim analysis can also call for potential termination or appropriate modification in sample size, study design, and even an early declaration of success. Given the extraordinary size and complexity today, this rational approach helps to analyze and predict the outcomes of a clinical trial that incorporate what is learned during the course of a study or a clinical development program. Such approach can also fill the gap by directing the resources toward relevant and optimized clinical trials between unmet medical needs and interventions being tested currently rather than fulfilling only business and profit goals.
Gordon, Robert; Magee, Christopher; Frazer, Anna; Evans, Craig; McCosker, Kathryn
2010-06-01
This study compared the outcomes of an interim mechanical prosthesis program for lower limb amputees operated under a public and private model of service. Over a two-year period, 60 transtibial amputees were fitted with an interim prosthesis as part of their early amputee care. Thirty-four patients received early amputee care under a public model of service, whereby a prosthetist was employed to provide the interim mechanical prosthesis service. The remaining 26 patients received early amputee care under a private model of service, where an external company was contracted to provide the interim mechanical prosthesis service. The results suggested comparable clinical outcomes between the two patient groups. However, the public model appeared to be less expensive with the average labour cost per patient being 29.0% lower compared with the private model. The results suggest that a public model of service may provide a more comprehensive and less expensive interim prosthesis program for lower limb amputees.
A Continuum Approach for Developing School Leaders in an Urban District
ERIC Educational Resources Information Center
Normore, Anthony
2007-01-01
This study examined a four-staged leadership development continuum for school leaders in a large urban school district in the southeastern United States. The program under examination included: LEAD Program; Interim Assistant Principal Program; Intern Principal Program, and; First Year Principal Support/Interim Principal Program. Qualitative…
40 CFR 155.56 - Interim registration review decision.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 23 2010-07-01 2010-07-01 false Interim registration review decision... PROGRAMS REGISTRATION STANDARDS AND REGISTRATION REVIEW Registration Review Procedures § 155.56 Interim registration review decision. The Agency may issue, when it determines it to be appropriate, an interim...
Evaluation of the healthy schools program: Part I. Interim progress.
Beam, Margaret; Ehrlich, Ginny; Donze Black, Jessica; Block, Audrey; Leviton, Laura C
2012-01-01
Federal and state policies identify schools as a setting to prevent childhood obesity, but schools need better health-promoting strategies. The objective of this study was to evaluate interim progress in schools receiving hands-on training from the Healthy Schools Program, the nation's largest school-based program aimed at preventing childhood obesity. The 4-year program targets schools with predominantly low-income, African American, or Hispanic students. In 2010 we assessed schools that enrolled in the 2007-2008 and 2008-2009 school years. School representatives completed an inventory of 8 content areas: policy and systems, school meals, competitive foods and beverages, health education, physical education, physical activity outside of physical education, before- and after-school programs, and school employee wellness. Schools' baseline inventory was compared by t test with the most recent inventory available. Schools made significant changes in all content areas, and effect sizes were moderate to large. Participating schools improved environmental policies and practices to prevent childhood obesity. The program is a resource to implement recent federal and state policies.
2016-07-29
This rule adopts as final, with some modifications, the National School Lunch Program and School Breakfast Program regulations set forth in the interim final rule published in the Federal Register on June 28, 2013. The requirements addressed in this rule conform to the provisions in the Healthy, Hunger-Free Kids Act of 2010 regarding nutrition standards for all foods sold in schools, other than food sold under the lunch and breakfast programs. Most provisions of this final rule were implemented on July 1, 2014, a full year subsequent to publication of the interim final rule. This was in compliance with section 208 of the Healthy, Hunger-Free Kids Act of 2010, which required that State and local educational agencies have at least one full school year from the date of publication of the interim final rule to implement the competitive food provisions. Based on comments received on the interim final rule and implementation experience, this final rule makes a few modifications to the nutrition standards for all foods sold in schools implemented on July 1, 2014. In addition, this final rule codifies specific policy guidance issued after publication of the interim rule. Finally, this rule retains the provision related to the standard for total fat as interim and requests further comment on this single standard.
76 FR 43571 - Small Business HUBZone Program; Government Contracting Programs
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-21
... SMALL BUSINESS ADMINISTRATION 13 CFR Part 126 RIN 3245-AG45 Small Business HUBZone Program; Government Contracting Programs AGENCY: U.S. Small Business Administration. ACTION: Interim final rule with request for comments. SUMMARY: This interim final rule amends the U.S. Small Business Administration's...
42 CFR 418.307 - Periodic interim payments.
Code of Federal Regulations, 2010 CFR
2010-10-01
... (CONTINUED) MEDICARE PROGRAM HOSPICE CARE Payment for Hospice Care § 418.307 Periodic interim payments... payments. The biweekly interim payment amount is based on the total estimated Medicare payments for the...
7 CFR 15a.71 - Interim procedures.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 1 2010-01-01 2010-01-01 false Interim procedures. 15a.71 Section 15a.71 Agriculture Office of the Secretary of Agriculture EDUCATION PROGRAMS OR ACTIVITIES RECEIVING OR BENEFITTING FROM FEDERAL FINANCIAL ASSISTANCE Procedures (Interim) § 15a.71 Interim procedures. For the purposes of...
13 CFR 120.890 - Source of interim financing.
Code of Federal Regulations, 2014 CFR
2014-01-01
....890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may... experience or qualifications, SBA may require the interim loan to be managed by a third party such as a bank...
13 CFR 120.890 - Source of interim financing.
Code of Federal Regulations, 2010 CFR
2010-01-01
....890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may... experience or qualifications, SBA may require the interim loan to be managed by a third party such as a bank...
13 CFR 120.890 - Source of interim financing.
Code of Federal Regulations, 2013 CFR
2013-01-01
....890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may... experience or qualifications, SBA may require the interim loan to be managed by a third party such as a bank...
13 CFR 120.890 - Source of interim financing.
Code of Federal Regulations, 2012 CFR
2012-01-01
....890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may... experience or qualifications, SBA may require the interim loan to be managed by a third party such as a bank...
13 CFR 120.890 - Source of interim financing.
Code of Federal Regulations, 2011 CFR
2011-01-01
....890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may... experience or qualifications, SBA may require the interim loan to be managed by a third party such as a bank...
76 FR 19909 - International Terrorism Victim Expense Reimbursement Program
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-11
... 1121-AA78 International Terrorism Victim Expense Reimbursement Program AGENCY: Office of Justice... promulgating this interim-final rule for its International Terrorism Victim Expense Reimbursement Program... international terrorism. DATES: Effective date: This interim-final rule is effective April 11, 2011. Comment...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-09
... Proposed Interim Approval of Title V Operating Permits Program; Southern Ute Indian Tribe AGENCY... Title V Operating Permits Program submitted by the Southern Ute Indian Tribe (Tribe). The Tribe's Title V Operating Permit Program (Title V Program) was submitted for the purpose of administering a tribal...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-25
... anti-sweat heaters. Therefore, it is ordered that: The application for interim waiver filed by Samsung... control anti-sweat heaters according to the alternate test procedure as set forth in section IV...
76 FR 72623 - Literacy Program
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-25
... INFORMATION: This document finalizes the Bureau's Literacy Program regulations, published as an interim rule... DEPARTMENT OF JUSTICE Bureau of Prisons 28 CFR Part 544 [BOP-1036-F] RIN 1120-AA33 Literacy... Bureau's Literacy Program regulations, published as an interim rule on September 26, 1997 (62 FR 50791...
40 CFR 80.141 - Interim detergent gasoline program.
Code of Federal Regulations, 2014 CFR
2014-07-01
...) “Carburetor Cleanliness Test Procedure, State-of-the-Art Summary, Report: 1973-1981”, Coordinating Research... ultimate consumer; (ii) All additized post-refinery component (PRC); and (iii) All detergent additives sold... who manufacture, supply, or transfer detergent additives or detergent-additized post-refinery...
Linking the New York State NYSTP Assessments to NWEA MAP Tests
ERIC Educational Resources Information Center
Northwest Evaluation Association, 2016
2016-01-01
Northwest Evaluation Association™ (NWEA™) is committed to providing partners with useful tools to help make inferences from the Measures of Academic Progress® (MAP®) interim assessment scores. Recently, NWEA completed a concordance study to connect the scales of the New York State Testing Program (NYSTP) reading and math with those of the MAP…
75 FR 8526 - Procedures for Transportation Workplace Drug and Alcohol Testing Programs
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-25
... regarding the interim final rule (IFR) procedures for the use of a new alcohol screening device (ASD) which... for an employer to utilize a specific ASD to conduct required DOT alcohol tests, the device must (a... model specifications, (b) be published by NHTSA in the Federal Register on their most current ASD CPL...
Diversified Satellite Occupations Program. Interim Report.
ERIC Educational Resources Information Center
Call, John Reed
This interim report, covering the period of September 1970 to June 1971, describes a program conducted for elementary, junior high, and senior high grades. The elementary program was designed to help students develop an understanding of occupational competence. The prevention of dropouts and individualizing instruction were concerns of the junior…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-15
... Administration (HRSA), HHS. ACTION: Interim final rule with request for comments. SUMMARY: The Public Readiness and Emergency Preparedness Act (PREP Act) authorizes the Secretary of Health and Human Services (the Secretary) to establish the Countermeasures Injury Compensation Program (CICP or Program). The Department of...
2014-01-06
The U.S. Office of Personnel Management (OPM) is issuing an interim final regulation to update the Federal Employees Health Benefits Program (FEHBP) and the Federal Employees Dental and Vision Insurance Program (FEDVIP) regulations to reflect updated election opportunities for participants in the Pathways Programs. The Pathways Programs were created by Executive Order (E.O.) 13562, signed by the President on December 27, 2010, and are designed to enable the Federal Government to compete effectively for students and recent graduates by improving its recruitment efforts through internships and similar programs with Federal agencies. This interim final rule furthers these recruitment and retention efforts by providing health insurance, as well as dental and vision benefits, to eligible program participants and their families.
DOE Office of Scientific and Technical Information (OSTI.GOV)
DOE; ORNL; NREL
1999-10-15
The Diesel Emission Control-Sulfur Effects (DECSE) is a joint government/industry program to determine the impact of diesel fuel sulfur levels on emission control systems whose use could lower emissions of nitrogen oxides (NOx) and particulate matter (PM) from on-highway trucks in the 2002--2004 model years. Phase 1 of the program was developed with the following objectives in mind: (1) evaluate the effects of varying the level of sulfur content in the fuel on the emission reduction performance of four emission control technologies; and (2) measure and compare the effects of up to 250 hours of aging on selected devices formore » multiple levels of fuel sulfur content. This interim report discusses the results of the DECSE test program that demonstrates the potential of NOx adsorber catalyst technology across the range of diesel engine operation with a fuel economy penalty less than 4%.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-28
... Interim Staff Guidance on Standard Review Plan, Section 17.4, ``Reliability Assurance Program'' AGENCY... design reliability assurance program (RAP). This ISG updates the guidance provided to the staff in Standard Review Plan (SRP), Section 17.4, ``Reliability Assurance Program,'' of NUREG-0800, ``Standard...
28 CFR 94.41 - Interim emergency payment.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 28 Judicial Administration 2 2012-07-01 2012-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency payment...
28 CFR 94.41 - Interim emergency payment.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 28 Judicial Administration 2 2011-07-01 2011-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency payment...
28 CFR 94.41 - Interim emergency payment.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency payment...
28 CFR 94.41 - Interim emergency payment.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 28 Judicial Administration 2 2014-07-01 2014-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency payment...
28 CFR 94.41 - Interim emergency payment.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 28 Judicial Administration 2 2013-07-01 2013-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency payment...
2005-03-16
This interim final rule establishes requirements and procedures for implementation of TRICARE Reserve Select. It also revises requirements and procedures for the Transitional Assistance Management Program. In addition, it establishes requirements and procedures for implementation of the earlier TRICARE eligibility for certain reserve component members. The rule is being published as an interim final rule with comment period in order to comply with statutory effective dates.
Zerger, Suzanne; Francombe Pridham, Katherine; Jeyaratnam, Jeyagobi; Connelly, Jolynn; Hwang, Stephen; O'Campo, Patricia; Stergiopoulos, Vicky
2014-07-01
The housing first (HF) model for individuals experiencing homelessness and mental illness differs by design from traditional models that require consumers to achieve "housing readiness" by meeting program or treatment prerequisites in transitional housing settings prior to permanent housing placement. Given a growing body of evidence for its favorable outcomes and cost effectiveness, HF is increasingly seen as an alternative to and argument against these traditional programs. As such, it is important that the elements and implementation challenges of the HF model be clearly understood and articulated. This qualitative study explored a largely unexamined aspect of the HF model-the need for and meaning of temporary residential settings (interim housing), a place to stay while waiting to secure permanent housing-using interviews and focus groups with service providers and consumers who experienced interim housing during implementation of HF in a large urban center. Although interim housing may not be necessary for all programs implementing the model, our study revealed numerous reasons and demands for safe, flexible interim housing options, and illustrated how they influence the effectiveness of consumer recovery, continuous service engagement, and housing stability.
A Study of an Emerging Occupation: The Gastroenterology Assistant. Interim Report.
ERIC Educational Resources Information Center
Kuritsky, Joel; Goldsmith, Katherine L.
To determine the need, desirability, and training requirements for a gastroenterology assistant training program, interviews with gastroenterologists, a survey of 15 hospitals, and observations of gastroenterology laboratories were conducted. In addition, a questionnaire to ascertain which laboratory tests the assistant would perform was…
DOT National Transportation Integrated Search
2007-11-01
This interim report to Congress summarizes the progress and initial results of the Federal Highway Administrations (FHWA) and the four pilot communities participation in the Nonmotorized Transportation Pilot Program (NTPP) from its inception th...
ERIC Educational Resources Information Center
Illinois State Dept. on Aging, Springfield.
This document contains the third annual interim report of the Illinois Elder Abuse Demonstration Program. It discusses the overall intent of the demonstration program, trends and changes in the third year of the demonstration program compared with the results from the first two years of the program, and achievements and recommendations for a…
National Home Start Evaluation. Interim Report V: Case Studies.
ERIC Educational Resources Information Center
Jerome, Chris H.; And Others
One of a series of documents on the evaluation of the National Home Start (NHS) program this third year interim report of case studies describes program efforts and successes with 16 Home Start families throughout the nation. A federally funded demonstration program, NHS is aimed at providing home-based services (such as health, education,…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-30
...-2011-02; Aging Management Program for Steam Generators AGENCY: Nuclear Regulatory Commission. ACTION... License Renewal Interim Staff Guidance (LR-ISG), LR-ISG-2011-02, ``Aging Management Program for Steam... using Revision 3 of NEI 97-06 to manage steam generator aging. The Draft LR-ISG revises the NRC staff's...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-16
... program. The heading for this rule displayed a RIN number of 2506-AC29, which was incorrect. RIN number.... ACTION: Interim rule; correction. SUMMARY: The document advises that the interim rule for the Emergency Solutions Grants program, published on December 5, 2011, displayed an incorrect RIN number. This document...
78 FR 70244 - Electronic Interim Assistance Reimbursement Program
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-25
... SOCIAL SECURITY ADMINISTRATION 20 CFR Part 416 [Docket No. SSA-2011-0104] RIN 0960-AH45 Electronic Interim Assistance Reimbursement Program AGENCY: Social Security Administration. ACTION: Notice of.... We strongly urge you not to include in your comments any personal information, such as Social...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-24
... DEPARTMENT OF THE INTERIOR Bureau of Ocean Energy Management, Regulation and Enforcement [Docket..., Regulation and Enforcement (BOEMRE), Interior. ACTION: Notice of Intent (NOI) to Prepare an Environmental... technology testing facility located on the OCS, in accordance with the Department of the Interior and the...
DOT National Transportation Integrated Search
2000-04-01
In the mid 1990s the Federal Highway Administration (FHWA) established a High Performance Concrete (HPC) program aimed at demonstrating the positive effects of utilizing HPC in bridges. Research on the benefits of using HPC for bridges has shown a nu...
40 CFR 80.156 - Liability for violations of the interim detergent program controls and prohibitions.
Code of Federal Regulations, 2010 CFR
2010-07-01
..., or detergent-additized post-refinery component satisfied relevant requirements when it left their... detergent satisfied all relevant requirements when it left the detergent manufacturer's control; and (B... manufactured. (2) The test results must accurately establish that, when it left the manufacturer's control, the...
78 FR 40199 - Draft Spent Fuel Storage and Transportation Interim Staff Guidance
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-03
... NUCLEAR REGULATORY COMMISSION [NRC-2013-0140] Draft Spent Fuel Storage and Transportation Interim... Spent Fuel Storage and Transportation Interim Staff Guidance No. 24 (SFST-ISG-24), Revision 0, ``The Use of a Demonstration Program as Confirmation of Integrity for Continued Storage of High Burnup Fuel...
ERIC Educational Resources Information Center
Southwest Regional Lab., Los Alamitos, CA.
This document presents an interim report about tobacco use and its prevention among students in California schools. It focuses on the efforts of the Tobacco Use Prevention Education (TUPE) program, a part of the California Department of Education's Drug, Alcohol, and Tobacco Education (DATE) program. It is noted that TUPE programs have operated in…
78 FR 67442 - Congestion Mitigation and Air Quality Improvement Program Interim Guidance
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-12
... the CMAQ Program as a result of the enactment of the Moving Ahead for Progress in the 21st Century Act (MAP-21). The Interim Guidance also contains changes to clarify the 2008 CMAQ Program Guidance. Because... Act for the 21st Century (TEA-21) (Pub. L. 105-178; Oct. 1998) and the Safe, Accountable, Flexible...
National Home Start Evaluation Interim Report VII. Twenty-Month Program Analysis and Findings.
ERIC Educational Resources Information Center
Love, John M.; And Others
This interim evaluation report focuses on process (formative) and outcome (summative) data collected in spring 1975 on the National Home Start Program. Home Start, a federally-funded 3-year (1972-1975) home-based demonstration program for low-income families with 3- to 5-year-old children was designed to enhance a mother's skills in dealing with…
42 CFR 110.83 - Payment of all benefits.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Secretary determines the mechanism of payment of Program benefits. She may choose to pay any benefits under... Secretary has the discretion to make interim payments of benefits under this Program, even before a final... only in exceptional cases. The Secretary may, for example, make an interim payment of medical benefits...
School Health Program. Interim Guide. Grade 9.
ERIC Educational Resources Information Center
Northwest Territories Dept. of Education, Yellowknife.
This interim guide, a component of the Northwest Territories (Canada) School Health Program, includes instructional strategies, lesson plans, reproducibles, and teacher background materials for ninth grade classes. The material is organized around the three curriculum units: (1) the mental and emotional well-being unit which has three lessons on…
31 CFR 50.7 - Special Rules for Interim Guidance Safe Harbors.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 31 Money and Finance: Treasury 1 2013-07-01 2013-07-01 false Special Rules for Interim Guidance Safe Harbors. 50.7 Section 50.7 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM RISK INSURANCE PROGRAM General Provisions § 50.7 Special Rules for Interim Guidance Safe Harbors...
31 CFR 50.7 - Special Rules for Interim Guidance Safe Harbors.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 31 Money and Finance: Treasury 1 2014-07-01 2014-07-01 false Special Rules for Interim Guidance Safe Harbors. 50.7 Section 50.7 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM RISK INSURANCE PROGRAM General Provisions § 50.7 Special Rules for Interim Guidance Safe Harbors...
31 CFR 50.7 - Special Rules for Interim Guidance Safe Harbors.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 31 Money and Finance: Treasury 1 2012-07-01 2012-07-01 false Special Rules for Interim Guidance Safe Harbors. 50.7 Section 50.7 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM RISK INSURANCE PROGRAM General Provisions § 50.7 Special Rules for Interim Guidance Safe Harbors...
31 CFR 50.7 - Special Rules for Interim Guidance Safe Harbors.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 31 Money and Finance: Treasury 1 2011-07-01 2011-07-01 false Special Rules for Interim Guidance Safe Harbors. 50.7 Section 50.7 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM RISK INSURANCE PROGRAM General Provisions § 50.7 Special Rules for Interim Guidance Safe Harbors...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-18
... resolution. The goal of the interim policy is to strike a careful balance by accommodating residential... will allow the agency to complete a separate, ongoing general aviation airport study that is analyzing the federally assisted general aviation airport system. The interim policy adopts the changes proposed...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-16
...-05: Ongoing Review of Operating Experience AGENCY: Nuclear Regulatory Commission. ACTION: Interim... License Renewal Interim Staff Guidance (LR-ISG), LR-ISG-2011-05, ``Ongoing Review of Operating Experience... industry-wide operating experience as an attribute of aging management programs used at nuclear power...
31 CFR 50.7 - Special Rules for Interim Guidance Safe Harbors.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 31 Money and Finance: Treasury 1 2010-07-01 2010-07-01 false Special Rules for Interim Guidance Safe Harbors. 50.7 Section 50.7 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM RISK INSURANCE PROGRAM General Provisions § 50.7 Special Rules for Interim Guidance Safe Harbors...
76 FR 21109 - Rural Energy for America Program
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-14
...The Rural Business-Cooperative Service (Agency) is establishing an interim rule for the Rural Energy for America Program (REAP), which is authorized under the Food, Conservation, and Energy Act of 2008. This interim rule modifies the existing grant and guaranteed loan program for renewable energy systems and energy efficiency improvements. In addition, it adds a grant program for feasibility studies for renewable energy systems and a grant program for energy audits and renewable energy development assistance, as provided in the Food, Conservation, and Energy Act of 2008.
1965-01-01
Workers at the Marshall Space Flight Center's (MSFC) Dynamic Test Stand install S-IB-200D, a dynamic test version of the Saturn IB launch vehicle's first stage, on January 11, 1965. MSFC Test Laboratory persornel assembled a complete Saturn IB to test the launch vehicle's structural soundness. Developed by the MSFC as an interim vehicle in MSFC's "building block" approach to the Saturn rocket development, the Saturn IB utilized Saturn I technology to further develop and refine the larger boosters and the Apollo spacecraft capabilities required for the manned lunar missions.
77 FR 3559 - Energy Conservation Program for Consumer Products: Test Procedures for Refrigerators...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-25
..., which is typical of an approach enabled by more sophisticated electronic controls. Id. The interim final... and long- time automatic defrost or variable defrost control and adjust the default values of maximum... accurate measurement of the energy use of products with variable defrost control. DATES: The amendments are...
1990-05-01
curves ; test reports; test cylinders: samples, O&M manuals including parts lists; certifications; warranties and other such required submittals...purpose. 14.4.3. Authority and responsibilities of all quality control personnel. 14.4.4. Schedule of Use of inspection personnel by types and phase of...quality control program shall include four phases of inspection and tests. The Contracting Officer’s representative shall be notified at least 24
Cunningham, Charles E; Rimas, Heather; Chen, Yvonne; Deal, Ken; McGrath, Patrick; Lingley-Pottie, Patricia; Reid, Graham J; Lipman, Ellen; Corkum, Penny
2015-01-01
Using a discrete choice conjoint experiment, we explored the design of parenting programs as an interim strategy for families waiting for children's mental health treatment. Latent class analysis yielded 4 segments with different design preferences. Simulations predicted the Fast-Paced Personal Contact segment, 22.1% of the sample, would prefer weekly therapist-led parenting groups. The Moderate-Paced Personal Contact segment (24.7%) preferred twice-monthly therapist-led parenting groups with twice-monthly lessons. The Moderate-Paced E-Contact segment (36.3%), preferred weekly to twice-monthly contacts, e-mail networking, and a program combining therapist-led sessions with the support of a computerized telephone e-coach. The Slow-Paced E-Contact segment (16.9%) preferred an approach combining monthly therapist-led sessions, e-coaching, and e-mail networking with other parents. Simulations predicted 45.3% of parents would utilize an option combining 5 therapist coaching calls with 5 e-coaching calls, a model that could reduce costs and extend the availability of interim services. Although 41.0% preferred weekly pacing, 58% were predicted to choose an interim parenting service conducted at a twice-monthly to monthly pace. The results of this study suggest that developing interim services reflecting parental preferences requires a choice of formats that includes parenting groups, telephone-coached distance programs, and e-coaching options conducted at a flexible pace.
A longitudinal medical Spanish program at one US medical school.
Reuland, Daniel S; Frasier, Pamela Y; Slatt, Lisa M; Alemán, Marco A
2008-07-01
Policymakers have recommended recruiting or training (or both) more US physicians who can provide care in Spanish. Few longitudinal medical Spanish programs have been described and evaluated. This study aims to describe development and evaluation of the preclinical phase of a 4-y program designed to graduate physicians who can provide language-concordant care in Spanish. Study was done in one public medical school in southeastern USA. The program targeted intermediate/advanced Spanish speakers. Standardized fluency assessments were used to determine eligibility and evaluate participants' progress. Curriculum included didactic coursework, simulated patients, socio-cultural seminars, clinical skills rotations at sites serving Latinos, service-learning, and international immersion. For the first two cohorts (n = 45) qualitative evaluation identified program improvement opportunities and found participants believed the program helped them maintain their Spanish skills. Mean interim (2-y) speaking proficiency scores were unchanged from baseline: 9.0 versus 8.7 at baseline on 12-point scale (p = 0.15). Mean interim listening comprehension scores (second cohort only, n = 25) increased from a baseline of 77 to 86% (p = 0.003). Proportions "passing" the listening comprehension test increased from 72 to 92% (p = 0.06). We describe development of a longitudinal Spanish program within a medical school. Participation was associated with improved Spanish listening comprehension and no change in speaking proficiency.
ERIC Educational Resources Information Center
Smith, Allen G.; And Others
This interim report describes the development of program implementation and cost studies for Year II of the process evaluation of Project Developmental Continuity (PDC), a Head Start demonstration program aimed at providing educational and developmental continuity between children's Head Start and primary school experiences. Specific areas focused…
The Evaluation of Abstinence Education Programs Funded Under Title V Section 510: Interim Report.
ERIC Educational Resources Information Center
Devaney, Barbara; Johnson, Amy; Maynard, Rebecca; Trenholm, Chris
This report presents interim findings from an independent, federally funded evaluation of the abstinence education programs authorized under the Personal Responsibility and Work Opportunity Reconciliation Act (PRWORA) and defined under Title V, Section 510 (b)(2)(A-H) of the Social Security Act. The report draws heavily on 4 years of…
40 CFR 52.243 - Interim approval of the Carbon Monoxide plan for the South Coast.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Interim approval of the Carbon Monoxide plan for the South Coast. 52.243 Section 52.243 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.243 Interim approval of the Carbon...
2008-07-17
OIG is adopting in final form, without change, an interim final rule published on March 26, 2008 (73 FR 15937). We received no comments to the interim final rule. The interim final rule revised the process for advisory opinion requestors to submit payments for advisory opinion costs.
40 CFR 52.243 - Interim approval of the Carbon Monoxide plan for the South Coast.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 3 2014-07-01 2014-07-01 false Interim approval of the Carbon Monoxide plan for the South Coast. 52.243 Section 52.243 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.243 Interim approval of the Carbon...
40 CFR 52.243 - Interim approval of the Carbon Monoxide plan for the South Coast.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 3 2013-07-01 2013-07-01 false Interim approval of the Carbon Monoxide plan for the South Coast. 52.243 Section 52.243 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.243 Interim approval of the Carbon...
40 CFR 52.243 - Interim approval of the Carbon Monoxide plan for the South Coast.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 3 2012-07-01 2012-07-01 false Interim approval of the Carbon Monoxide plan for the South Coast. 52.243 Section 52.243 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.243 Interim approval of the Carbon...
This schedule indicates plans for completion of risk assessments, proposed interim decisions and interim decisions for pesticides in the Registration Review program, EPA reviews all registered pesticides at least every 15 years as required by FIFRA.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-06
... Practice; Interim Commission Review of Public Company Accounting Oversight Board Inspection Reports and... facilitate interim Commission review of Public Company Accounting Oversight Board [[Page 47445
Bowhead and gray whale migration model description. Interim report No. 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1985-03-22
Migration models for bowhead and gray whales in Alaskan waters were conceptualized, programmed, calibrated, and tested against observations. These verification tests do not supply irrefutable evidence that the model reproduces an average migratory pattern for either species. This is due in part to the high degree of interannual variability that normally occurs in Arctic and sub-Arctic environments. Furthermore, the model structure is flexible enough to allow changes to be readily implemented.
Interim Testing, Socio-Economic Status, and the Odds of Passing Grade 8 State Tests in New Jersey
ERIC Educational Resources Information Center
Babo, Gerard; Tienken, Christopher H.; Gencarelli, Maria A.
2014-01-01
A review of the literature pertaining to the effect and influence of commercially-prepared interim assessments in mathematics and language arts literacy reveals a lack of quantitative data to determine the value of these products for school reform. This study examined the ability of commercially-prepared interim pretest and posttest assessments in…
2010-08-06
This interim final rule establishes requirements and procedures for implementation of TRICARE Retired Reserve. This interim final rule addresses provisions of the National Defense Authorization Act for Fiscal Year 2010 (NDAA-10). The purpose of this interim final rule is to establish the TRICARE Retired Reserve program that implements section 705 of the NDAA-10. Section 705 allows members of the Retired Reserve who are qualified for non-regular retirement, but are not yet 60 years of age, to qualify to purchase medical coverage equivalent to the TRICARE Standard (and Extra) benefit unless that member is either enrolled in, or is eligible to enroll in, a health benefit plan under Chapter 89 of Title 5, United States Code, as well as certain survivors. The amount of the premium that qualified members pay to purchase these benefits will represent the full cost as determined on an appropriate actuarial basis for coverage under the TRICARE Standard (and Extra) benefit including the cost of the program administration. There will be one premium for member-only coverage and a separate premium for member and family coverage. The rules and procedures otherwise outlined in Part 199 of 32 CFR relating to the operation and administration of the TRICARE Standard and Extra programs including the required cost-shares, deductibles and catastrophic caps for retired members and their dependents will apply to this program. The rule is being published as an interim final rule with comment period in order to comply with statutory effective dates.
ERIC Educational Resources Information Center
Smith, Allen G.; And Others
This third year interim report, one of a series of documents on the evaluation of Project Developmental Continuity (PDC), presents findings from three major analyses of program implementation; measurement of the extent each program has implemented the basic PDC Guidelines; a description of patterns of that implementation; and analysis of some…
ERIC Educational Resources Information Center
Perlberg, Arye; Rom, Yael
This resume of an interim report discusses a university preparatory program for Israeli soldiers of Islamic (Sephardic) origin. The Israeli Defense Forces identify and select the candidates, who must be of Sephardic, low socioeconomic status background and have certificates from academic or vocational high schools. The chosen students are soldiers…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-01
... (202) 501-4755. List of Rules in FAC 2005-51 Item Subject FAR case Analyst *I Women-Owned Small 2010...--Women-Owned Small Business (WOSB) Program (FAR Case 2010-015) (Interim) This interim rule amends the FAR to add subpart 19.15, Women-Owned Small Business Program, which will assist Federal agencies in...
Conley, Kathleen M; Majersik, Jennifer; Gonzales, Nicole R; Maddox, Katherine E; Pary, Jennifer K; Brown, Devin L; Moyé, Lemuel A; Espinosa, Nina; Grotta, James C; Morgenstern, Lewis B
2009-01-01
The KIDS (Kids Identifying and Defeating Stroke) Program is a three-year prospective, randomized, controlled, multiethnic school-based intervention study. Program goals include increasing knowledge of stroke signs and treatment and intention to immediately call 911 among Mexican American (MA) and non-Hispanic white (NHW) middle school students and their parents. This article describes the design, implementation and interim evaluation of this theory-based intervention. Intervention students received a culturally appropriate stroke education program divided into four 50-minute classes each year during the 6th, 7th, and 8th grades. Each class session also included a homework assignment that involved the students’ parents or other adult partners. Interim-test results indicate that this educational intervention was successful in improving students’ stroke symptom and treatment knowledge and intent to call 911 upon witnessing a stroke compared with controls (p<0.001). We conclude that this school-based educational intervention to reduce delay time to hospital arrival for stroke shows early promise. PMID:18332150
1960-01-01
Marshall Space Flight Center (MSFC) workers hoist a dynamic test version of the S-IVB stage, the Saturn IB launch vehicle's second stage, into the Center's Dynamic Test Stand on January 18, 1965. MSFC Test Laboratory persornel assembled a complete Saturn IB to test the launch vehicle's structural soundness. Developed by the MSFC as an interim vehicle in MSFC's "building block" approach to the Saturn rocket development, the Saturn IB utilized Saturn I technology to further develop and refine the larger boosters and the Apollo spacecraft capabilities required for the manned lunar missions.
1965-01-01
Marshall Space Flight Center (MSFC) workers lower S-IB-200D, a dynamic test version of the Saturn IB launch vehicle's first stage (S-IB stage), into the Center's Dynamic Test Stand on January 12, 1965. Test Laboratory persornel assembled a complete Saturn IB to test the structural soundness of the launch vehicle. Developed by the MSFC as an interim vehicle in MSFC's "building block" approach to Saturn rocket development, the Saturn IB utilized Saturn I technology to further develop and refine large boosters and the Apollo spacecraft capabilities required for the manned lunar missions.
Alaska Interim Land Cover Mapping Program; final report
Fitzpatrick-Lins, Katherine; Doughty, E.F.; Shasby, Mark; Benjamin, Susan
1989-01-01
In 1985, the U.S. Geological Survey initiated a research project to develop an interim land cover data base for Alaska as an alternative to the nationwide Land Use and Land Cover Mapping Program. The Alaska Interim Land Cover Mapping Program was subsequently created to develop methods for producing a series of land cover maps that utilized the existing Landsat digital land cover classifications produced by and for the major land management agencies for mapping the vegetation of Alaska. The program was successful in producing digital land cover classifications and statistical summaries using a common statewide classification and in reformatting these data to produce l:250,000-scale quadrangle-based maps directly from the Scitex laser plotter. A Federal and State agency review of these products found considerable user support for the maps. Presently the Geological Survey is committed to digital processing of six to eight quadrangles each year.
ERIC Educational Resources Information Center
Immekus, Jason C.; Atitya, Ben
2016-01-01
Interim tests are a central component of district-wide assessment systems, yet their technical quality to guide decisions (e.g., instructional) has been repeatedly questioned. In response, the study purpose was to investigate the validity of a series of English Language Arts (ELA) interim assessments in terms of dimensionality and prediction of…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-25
... through the HEARTH Act. The statutory provisions and the implementing interim regulations that govern RHSP... HEARTH Act. The statutory provisions and the implementing interim regulations that govern RHSP require...
The WFIRST Interim Design Reference Mission: Capabilities, Constraints, and Open Questions
NASA Technical Reports Server (NTRS)
Kruk, Jeffrey W.
2012-01-01
The Project Office and Science Definition Team for the Wide-Field Infrared Survey Telescope (WFIRST) are in the midst of a pre-Phase A study to establish a Design Reference Mission (DRM). An Interim report was released in June 2011, with a final report due later in 2012. The predicted performance of the Interim DRM Observatory will be described, including optical quality, observing efficiency, and sensitivity for representative observing scenarios. Observing constraints and other limitations on performance will also be presented, with an emphasis on potential Guest Observer programs. Finally, a brief status update will be provided on open trade studies of interest to the scientific community. The final DRM may differ from the Interim DRM presented here. However, the underlying requirements of the scientific programs are not expected to change, hence the capabilities of the IDRM are likely to be maintained even if the implementation changes in significant ways.
INTERIM CRYOGENIC PROPULSION STAGE TEST ARTICLE UNLOADED PRIOR T
2016-06-20
TWO CRANES LIFT THE APPROXIMATELY 8,000-POUND INTERIM CRYOGENIC PROPULSION STAGE TEST ARTICLE OUT OF ITS CRATE AT MARSHALL. THE TEST ARTICLE ARRIVED AT MARSHALL SPACE FLIGHT CENTER VIA BARGE ON THE TENNESSEE RIVER AND WAS TRANSPORTED TO BUILDING 4649 WHERE TESTING WILL BEGIN.
ERIC Educational Resources Information Center
Granville, Arthur C.; And Others
This interim report, part of a series of documents examining the feasibility of the longitudinal evaluation of Project Developmental Continuity (PDC), presents the results of an analysis of PDC impact at the Head Start level, using Spring 1977 data. PDC is a Head Start Demonstration Program aimed at providing educational and developmental…
Autonomy Level Specification for Intelligent Autonomous Vehicles
2003-09-01
Autonomy Level Specification for Intelligent Autonomous Vehicles : Interim Progress Report Hui-Min Huang, Elena Messina, James Albus...Level Specification for Intelligent Autonomous Vehicles : Interim Progress Report 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6
1965-01-01
S-IB-200D, a dynamic test version of the Saturn IB launch vehicle's first stage (S-IB), makes its way to the Marshall Space Flight Center (MSFC) East Test Area on January 4, 1965. Test Laboratory persornel assembled a complete Saturn IB to test the structural soundness of the launch vehicle in the Dynamic Test Stand. Developed by the MSFC as an interim vehicle in MSFC's "building block" approach to the Saturn rocket development, the Saturn IB utilized Saturn I technology to further develop and refine the larger boosters and the Apollo spacecraft capabilities required for the manned lunar missions.
What a Difference a Day Makes: Change in Memory for Newly Learned Word Forms Over 24 Hours
McGregor, Karla K.
2014-01-01
Purpose This study explored the role of time and retrieval experience in the consolidation of word forms. Method Participants were 106 adults trained on 16 novel word-referent pairs, then tested immediately and 24 hr later for recognition and recall of word forms. In the interim, tests were repeated 2 hr or 12 hr after training, or not at all, thus varying the amount and timing of retrieval experience. Results Recognition accuracy was stable and speed improved over the 24-hr period. But these manifestations of consolidation did not depend on interim retrieval experience; in fact, the 2-hr interim test interfered with improvements in speed. In contrast, the number of word forms recalled increased only with interim retrieval experiences, and the 12-hr interim test was more advantageous to recall than the 2-hr test. Conclusions After a word form is encoded, it can become stronger with time. Retrieval experience can also strengthen the trace, but, if retrieval occurs when the memory is still labile, it can be disruptive. This complex interplay between retrieval experience and time holds implications for measuring learning outcomes and for scheduling practice in classrooms and clinics. PMID:24845578
Interim reliability evaluation program, Browns Ferry fault trees
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stewart, M.E.
1981-01-01
An abbreviated fault tree method is used to evaluate and model Browns Ferry systems in the Interim Reliability Evaluation programs, simplifying the recording and displaying of events, yet maintaining the system of identifying faults. The level of investigation is not changed. The analytical thought process inherent in the conventional method is not compromised. But the abbreviated method takes less time, and the fault modes are much more visible.
NASA Technical Reports Server (NTRS)
2009-01-01
This Interim Standard establishes requirements for evaluation, testing, and selection of materials that are intended for use in space vehicles, associated Ground Support Equipment (GSE), and facilities used during assembly, test, and flight operations. Included are requirements, criteria, and test methods for evaluating the flammability, offgassing, and compatibility of materials.
Intelligent cruise control field operational test : interim report
DOT National Transportation Integrated Search
1997-03-01
This interim document reports on a cooperative agreement between NHTSA and UMTRI entitled Intelligent Cruise Control (ICC) Field Operational Test (FOT). The overarching goal of the work is to characterize safety and comfort issues that are fundamenta...
Computerization of material test data reporting system : interim report.
DOT National Transportation Integrated Search
1973-09-01
This study was initiated to provide an integrated system of reporting, storing, and retrieving of construction and material test data using computerized (storage-retrieval) and quality control techniques. The findings reported in this interim report ...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Abdelaziz, Omar; Munk, Jeffrey D.; Shrestha, Som S.
The Oak Ridge National Laboratory (ORNL) High-Ambient Temperature Testing Program for Low-GWP Refrigerants aims to develop an understanding of the performance of low-Global Warming Potential (low-GWP) alternatives to Hydrochlorofluorocarbon (HCFC) and Hydrofluorocarbon (HFC) refrigerants in mini-split air conditioners under high ambient temperature conditions. This interim working paper describes the parties involved, the alternative refrigerants selection process, the test procedures, and the preliminary results.
The Decanal Divide: Women in Decanal Roles at U.S. Medical Schools.
Schor, Nina F
2018-02-01
To test the hypotheses that women in medical school dean-level (decanal) positions occupy lower-rank and more image- and education-focused positions than men, and that state and woman-led schools have more women in decanal positions. Data were collected on September 10-18, 2016, from Web sites of 136 allopathic, U.S. medical schools accredited by the Liaison Committee on Medical Education and represented on the roster of accredited MD programs in the United States with full accreditation as of June 22, 2016. Statistical significance of differences between comparison groups was assessed using Student t test with P < .05 indicating significance. Correlation between parameters was determined by Spearman rank correlation test with P < .05 indicating significant correlation. Findings demonstrate that only 15% (22/149) of deans and interim deans are women, and the prevalence of women in decanal positions decreases with ascending professional rank (R = 0.93; P < .05). Women are most prevalent in decanal positions focusing on education and mentoring or institutional public image and least prevalent in those focusing on corporate strategy and policy, finance, or government relations. Schools with a woman as dean or interim dean have a higher percentage of decanal positions occupied by women than those with a man as dean or interim dean (P < .05). State and private medical schools do not differ from one another in this regard. Gender stereotypes and models appear to continue to drive the number and roles of women in decanal positions.
1982-04-12
EPA regulations to protect human health and the environment from the improper management of hazardous waste were published in the Federal Register on May 19, 1980 (45 FR 33063). These regulations include provisions for authorization of State programs to operate in lieu of the Federal program. Today EPA is announcing the availability for public review of the Indiana application for Phase I Interim Authorization, inviting public comment, and giving notice of a public hearing to be held on the application.
2014-03-19
This interim final rule requires issuers of qualified health plans (QHPs), including stand-alone dental plans (SADPs), to accept premium and cost-sharing payments made on behalf of enrollees by the Ryan White HIV/AIDS Program, other Federal and State government programs that provide premium and cost sharing support for specific individuals, and Indian tribes, tribal organizations, and urban Indian organizations.
47 CFR 73.404 - Interim hybrid IBOC DAB operation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... RADIO BROADCAST SERVICES Digital Audio Broadcasting § 73.404 Interim hybrid IBOC DAB operation. (a) The... test operation pursuant to § 73.1620, may commence interim hybrid IBOC DAB operation with digital... No. 99-325. FM stations are permitted to operate with hybrid digital effective radiated power equal...
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Interim relief. 7.44 Section 7.44 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development EQUAL EMPLOYMENT OPPORTUNITY; POLICY, PROCEDURES AND PROGRAMS Equal Employment Opportunity Without Regard to Race...
Code of Federal Regulations, 2012 CFR
2012-04-01
... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false Interim relief. 7.44 Section 7.44 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development EQUAL EMPLOYMENT OPPORTUNITY; POLICY, PROCEDURES AND PROGRAMS Equal Employment Opportunity Without Regard to Race...
Code of Federal Regulations, 2011 CFR
2011-04-01
... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Interim relief. 7.44 Section 7.44 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development EQUAL EMPLOYMENT OPPORTUNITY; POLICY, PROCEDURES AND PROGRAMS Equal Employment Opportunity Without Regard to Race...
Code of Federal Regulations, 2013 CFR
2013-04-01
... 24 Housing and Urban Development 1 2013-04-01 2013-04-01 false Interim relief. 7.44 Section 7.44 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development EQUAL EMPLOYMENT OPPORTUNITY; POLICY, PROCEDURES AND PROGRAMS Equal Employment Opportunity Without Regard to Race...
Code of Federal Regulations, 2014 CFR
2014-04-01
... 24 Housing and Urban Development 1 2014-04-01 2014-04-01 false Interim relief. 7.44 Section 7.44 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development EQUAL EMPLOYMENT OPPORTUNITY; POLICY, PROCEDURES AND PROGRAMS Equal Employment Opportunity Without Regard to Race...
NASA Technical Reports Server (NTRS)
Wobber, F. J.; Martin, K. R. (Principal Investigator); Amato, R. V.; Leshendok, T.
1974-01-01
The author has identified the following significant results. The procedure for conducting a regional geological mapping program utilizing snow-enhanced ERTS-1 imagery has been summarized. While it is recognized that mapping procedures in geological programs will vary from area to area and from geologist to geologist, it is believed that the procedure tested in this project is applicable over a wide range of mapping programs. The procedure is designed to maximize the utility and value of ERTS-1 imagery and aerial photography within the initial phase of geological mapping programs. Sample products which represent interim steps in the mapping formula (e.g. the ERTS Fracture-Lineament Map) have been prepared. A full account of these procedures and products will be included within the Snow Enhancement Users Manual.
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
1992-09-01
This document describes the environmental monitoring program at the Maywood Interim Storage Site (MISS) and surrounding area, implementation of the program, and monitoring results for 1991. Environmental monitoring of MISS began in 1984 when congress added the site to the US Department of Energy's (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP is a DOE program to identify and decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation's atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The environmental monitoring program at MISS includesmore » sampling networks for radon and thoron concentrations in air; external gamma radiation-exposure; and total uranium, radium-226, radium-228, thorium-232, and thorium-230 concentrations in surface water, sediment, and groundwater. Additionally, several nonradiological parameters are measured in surface water, sediment, and groundwater. Monitoring results are compared with applicable Environmental Protection Agency standards, DOE derived concentration guides (DCGs), dose limits, and other requirements in DOE orders. Environmental standards are established to protect public health and the environment.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pretzsch, Gunter; Salewski, Peter; Sogalla, Martin
2013-07-01
The German Federal Ministry for the Environment, Nature Conservation and Nuclear Safety (BMU) on behalf of the Government of the Federal Republic of Germany supports the State Nuclear Regulatory Inspectorate of Ukraine (SNRIU) in enhancement of nuclear safety and radiation protection and strengthening of the physical protection. One of the main objectives of the agreement concluded by these parties in 2008 was the retrieval and safe interim storage of disused orphan high radioactive sealed sources in Ukraine. At present, the Ukrainian National Registry does not account all high active radiation sources but only for about 70 - 80 %. GRSmore » in charge of BMU to execute the program since 2008 concluded subcontracts with the waste management and interim storage facilities RADON at different regions in Ukraine as well with the waste management and interim storage facility IZOTOP at Kiev. Below selected examples of removal of high active Co-60 and Cs-137 sources from irradiation facilities at research institutes are described. By end of 2012 removal and safe interim storage of 12.000 disused radioactive sealed sources with a total activity of more than 5,7.10{sup 14} Bq was achieved within the frame of this program. The German support program will be continued up to the end of 2013 with the aim to remove and safely store almost all disused radioactive sealed sources in Ukraine. (authors)« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
LaFreniere, L. M.
In September 2005, periodic sampling of groundwater was initiated by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) in the vicinity of a grain storage facility formerly operated by the CCC/USDA at Centralia, Kansas. The sampling at Centralia is being performed on behalf of the CCC/USDA by Argonne National Laboratory, in accord with a monitoring program approved by the Kansas Department of Health and Environment (KDHE). The objective is to monitor levels of carbon tetrachloride contamination identified in the groundwater at Centralia (Argonne 2003, 2004, 2005a). Under the KDHE-approved monitoring plan (Argonne 2005b), the groundwater was sampledmore » twice yearly from September 2005 until September 2007 for analyses for volatile organic compounds (VOCs), as well as measurement of selected geochemical parameters to aid in the evaluation of possible natural contaminant degradation (reductive dechlorination) processes in the subsurface environment. The results from the two-year sampling program demonstrated the presence of carbon tetrachloride contamination at levels exceeding the KDHE Tier 2 risk-based screening level (RBSL) of 5 {micro}g/L for this compound in a localized groundwater plume that has shown little movement. The relative concentrations of chloroform, the primary degradation product of carbon tetrachloride, suggested that some degree of reductive dechlorination or natural biodegradation was taking place in situ at the former CCC/USDA facility on a localized scale. The CCC/USDA subsequently developed an Interim Measure Conceptual Design (Argonne 2007b), proposing a pilot test of the Adventus EHC technology for in situ chemical reduction (ISCR). The proposed interim measure (IM) was approved by the KDHE in November 2007 (KDHE 2007). Implementation of the pilot test occurred in November-December 2007. The objective was to create highly reducing conditions that would enhance both chemical and biological reductive dechlorination in the injection test area (Argonne 2009a). The KDHE (2008a) has requested that sitewide monitoring continue at Centralia until a final remedy has been selected (as part of a Corrective Action Study [CAS] evaluation) and implemented for this site. In response to this request, twice-yearly sampling of 10 monitoring wells and 6 piezometers (Figure 1.1) previously approved by the KDHE for monitoring of the groundwater at Centralia (KDHE 2005a,b) was continued in 2008. The sampling events under this extension of the two-year (2005-2007) monitoring program occurred in March and September 2008 (Argonne 2008b, 2009b). Additional piezometers specifically installed to evaluate the progress of the IM pilot test (PMP1-PMP9; Figure 1.2) were also sampled in 2008; the results of these analyses were reported and discussed separately (Argonne 2009a). On the basis of results of the 2005-2008 sitewide monitoring and the 2008 IM pilot test monitoring, the CCC/USDA recommended a revised sampling program to address both of the continuing monitoring objectives until a CAS for Centralia is developed (Section 4.2 in Argonne 2009b). The elements of this interim monitoring plan are as follows: (1) Annual sampling of twelve previously established (before the pilot test) monitoring points (locations identified in Figure 1.3) and the five outlying pilot test monitoring points (PMP4, PMP5, PMP6, PMP7, PMP9; Figure 1.4); and (2) Sampling twice yearly at the five pilot test monitoring points inside the injection area (PMP1-PMP3, PMP8, MW02; Figure 1.4). With the approval of the KDHE (2009), groundwater sampling for analyses of VOCs and selected other geochemical parameters was conducted at Centralia under the interim monitoring program outlined above in April and October 2009. This report documents the findings of the 2009 monitoring events.« less
40 CFR 257.28 - Implementation of the corrective action program.
Code of Federal Regulations, 2010 CFR
2010-07-01
... interim measures necessary to ensure the protection of human health and the environment. Interim measures... supplies or sensitive ecosystems; (iv) Further degradation of the ground-water that may occur if remedial... situations that may pose threats to human health and the environment. (b) An owner or operator may determine...
"Intelligent" Computer Assisted Instruction (CAI) Applications. Interim Report.
ERIC Educational Resources Information Center
Brown, John Seely; And Others
Interim work is documented describing efforts to modify computer techniques used to recognize and process English language requests to an instructional simulator. The conversion from a hand-coded to a table driven technique are described in detail. Other modifications to a simulation based computer assisted instruction program to allow a gaming…
78 FR 41125 - Interim Enforcement Policy for Permanent Implant Brachytherapy Medical Event Reporting
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-09
... Brachytherapy Medical Event Reporting AGENCY: Nuclear Regulatory Commission. ACTION: Policy statement; revision... medical events occurring under an NRC licensee's permanent implant brachytherapy program. This interim..., ``Adequacy of Medical Event Definitions in 10 CFR [Title 10 of the Code of Federal Regulations] 35.3045, and...
The Urban Consumer Education Project. Interim Report, 1979-80.
ERIC Educational Resources Information Center
Marshall, Gail; Haas, Kay
This interim evaluation report of the St. Louis, Missouri Urban Consumer Education Project assesses program effectiveness in terms of teacher training and teacher knowledge of consumer basics, community resource participation, and student and teacher knowledge. The project was designed to teach fifth grade students their rights and…
Interim Evaluation of the National Literacy Program. Final Report
ERIC Educational Resources Information Center
Human Resources and Social Development Canada, 2007
2007-01-01
The evaluation examined issues related to: (1) Rationale and Relevance; (2) Implementation; and (3) Success. In addition, the interim evaluation was intended to: (1) Determine whether sufficient data was being collected to inform the summative evaluation and identify opportunities for improvement to fill any potential gaps; (2) Assess whether the…
Onsite 40-kilowatt fuel cell power plant manufacturing and field test program
NASA Technical Reports Server (NTRS)
1985-01-01
A joint Gas Research Institute and U.S. Department of Energy Program was initiated in 1982 to evaluate the use of fuel cell power systems for on-site energy service. Forty-six 40 kW fuel cell power plants were manufactured at the United Technologies Corporation facility in South Windsor, Connecticut, and are being delivered to host utilities and other program participants in the United States and Japan for field testing. The construction of the 46 fully-integrated power plants was completed in January 1985 within the constraints of the contract plan. The program has provided significant experience in the manufacture, acceptance testing, deployment, and support of on-site fuel cell systems. Initial field test results also show that these experimental power plants meet the performance and environmental requirements of a commercial specification. This Interim Report encompasses the design and manufacturing phases of the 40 kW Power Plant Manufacturing and Field Test program. The contract between UTC and NASA also provides UTC field engineering support to the host utilities, training programs and associated manuals for utility operating and maintenance personnel, spare parts support for a defined test period, and testing at UTC of a power plant made available from a preceding program phase. These activities are ongoing and will be reported subsequently.
NASA Technical Reports Server (NTRS)
Srivistava, Ashok N.; Barton, Phil
2012-01-01
This is the second interim report jointly prepared by NASA and easyJet on the work performed under the agreement to collaborate on a study of the factors entailed in flight and cabin-crew fatigue, and decreases in performance associated with fatigue. The objective of this Agreement is to generate reliable procedures that aid in understanding the levels and characteristics of flight and cabin-crew fatigue factors, both latent and proximate, whose confluence will likely result in unacceptable crew performance. This study entails the analyses of numerical and textual data collected during operational flights. NASA and easyJet are both interested in assessing and testing NASA s automated capabilities for extracting operationally significant information from very large, diverse (textual and numerical) databases; much larger than can be handled practically by human experts.
Tribal child welfare. Interim final rule.
2012-01-06
The Administration for Children and Families (ACF) is issuing this interim final rule to implement statutory provisions related to the Tribal title IV-E program. Effective October 1, 2009, section 479B(b) of the Social Security Act (the Act) authorizes direct Federal funding of Indian Tribes, Tribal organizations, and Tribal consortia that choose to operate a foster care, adoption assistance and, at Tribal option, a kinship guardianship assistance program under title IV-E of the Act. The Fostering Connections to Success and Increasing Adoptions Act of 2008 requires that ACF issue interim final regulations which address procedures to ensure that a transfer of responsibility for the placement and care of a child under a State title IV-E plan to a Tribal title IV-E plan occurs in a manner that does not affect the child's eligibility for title IV-E benefits or medical assistance under title XIX of the Act (Medicaid) and such services or payments; in-kind expenditures from third-party sources for the Tribal share of administration and training expenditures under title IV-E; and other provisions to carry out the Tribal-related amendments to title IV-E. This interim final rule includes these provisions and technical amendments necessary to implement a Tribal title IV-E program.
NASA Technical Reports Server (NTRS)
Brissenden, R. J. V.; Chartas, G.; Freeman, M. D.; Hughes, J. P.; Kellogg, E. M.; Podgorski, W. A.; Schwartz, D. A.; Zhao, P.
1992-01-01
This interim report presents some definitive results from our analysis of the VETA-I x-ray testing data. It also provides a description of the hardware and software used in the conduct of the VETA-I x-ray test program performed at the MSFC x-ray Calibration Facility (XRCF). These test results also serve to supply data and information to include in the TRW final report required by DPD 692, DR XC04. To provide an authoritative compendium of results, we have taken nine papers as published in the SPIE Symposium, 'Grazing Incidence X-ray/EUV Optics for Astronomy and Projection Lithography' and have reproduced them as the content of this report.
SLS INTERIM CRYOGENIC PROPULSION STAGE TEST ARTICLE ARRIVAL
2016-06-19
SLS INTERIM CRYOGENIC PROPULSION STAGE TEST ARTICLE ARRIVES AT WEST DOCK ON SHIELDS ROAD AND IS OFF LOADED FROM BARGEUAH ENGINEERING STUDENT ROBERT HILLAN TALKS TO SPACE STATION CREW MEMBERS ABOUT HIS WINNING 3-D PRINTED TOOL DESIGNED FOR USE ON ISS, AND IS INTERVIEWED BY LOCAL MEDIA
Retention of long-term interim restorations with sodium fluoride enriched interim cement
NASA Astrophysics Data System (ADS)
Strash, Carolyn
Purpose: Interim fixed dental prostheses, or "provisional restorations", are fabricated to restore teeth when definitive prostheses are made indirectly. Patients undergoing extensive prosthodontic treatment frequently require provisionalization for several months or years. The ideal interim cement would retain the restoration for as long as needed and still allow for ease of removal. It would also avoid recurrent caries by preventing demineralization of tooth structure. This study aims to determine if adding sodium fluoride varnish to interim cement may assist in the retention of interim restorations. Materials and methods: stainless steel dies representing a crown preparation were fabricated. Provisional crowns were milled for the dies using CAD/CAM technology. Crowns were provisionally cemented onto the dies using TempBond NE and NexTemp provisional cements as well as a mixture of TempBond NE and Duraphat fluoride varnish. Samples were stored for 24h then tested or thermocycled for 2500 or 5000 cycles before being tested. Retentive strength of each cement was recorded using a universal testing machine. Results: TempBond NE and NexTemp cements performed similarly when tested after 24h. The addition of Duraphat significantly decreased the retention when added to TempBond NE. NexTemp cement had high variability in retention over all tested time periods. Thermocycling for 2500 and 5000 cycles significantly decreased the retention of all cements. Conclusions: The addition of Duraphat fluoride varnish significantly decreased the retention of TempBond NE and is therefore not recommended for clinical use. Thermocycling significantly reduced the retention of TempBond NE and NexTemp. This may suggest that use of these cements for three months, as simulated in this study, is not recommended.
Annual report of groundwater monitoring at Centralia, Kansas, in 2010.
DOE Office of Scientific and Technical Information (OSTI.GOV)
LaFreniere, L. M.
In September 2005, periodic sampling of groundwater was initiated by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) in the vicinity of a grain storage facility formerly operated by the CCC/USDA at Centralia, Kansas. The sampling at Centralia is performed on behalf of the CCC/USDA by Argonne National Laboratory, in accord with a monitoring program approved by the Kansas Department of Health and Environment (KDHE). The objective is to monitor levels of carbon tetrachloride contamination identified in the groundwater at Centralia (Argonne 2003, 2004, 2005a). Under the KDHE-approved monitoring plan (Argonne 2005b), the groundwater was sampled twicemore » yearly from September 2005 until September 2007 for analyses for volatile organic compounds (VOCs), as well as measurement of selected geochemical parameters to aid in the evaluation of possible natural contaminant degradation processes (reductive dechlorination) in the subsurface environment (Argonne 2006, 2007a, 2008a). The results from the two-year sampling program demonstrated the presence of carbon tetrachloride contamination at levels exceeding the KDHE Tier 2 risk-based screening level (RBSL) of 5 {micro}g/L for this compound, in a localized groundwater plume that has shown little movement. The relative concentrations of chloroform, the primary degradation product of carbon tetrachloride, suggested that some degree of reductive dechlorination or natural biodegradation was talking place in situ at the former CCC/USDA facility on a localized scale. The CCC/USDA subsequently developed an Interim Measure Conceptual Design (Argonne 2007b), proposing a pilot test of the Adventus EHC technology for in situ chemical reduction (ISCR). The proposed interim measure (IM) was approved by the KDHE in November 2007 (KDHE 2007). Implementation of the pilot test occurred in November-December 2007. The objective was to create highly reducing conditions that would enhance both chemical and biological reductive dechlorination in the injection test area (Argonne 2009a). The KDHE (2008a) requested that sitewide monitoring continue until a final remedy is selected (as part of a Corrective Action Study [CAS] evaluation) and implemented. In response to this request, the established sampling across the site and additional sampling in the IM pilot test area continued in 2008 (Argonne 2008b, 2009a,b). On the basis of results of the 2005-2008 sitewide monitoring and the 2008 IM pilot test monitoring, the CCC/USDA recommended a revised sampling program for both the wider site and the IM pilot test area (Section 4.2 in Argonne 2009b). The elements of this interim monitoring plan are as follows: (1) Annual sampling of twelve monitoring points across the site (Figure 1.1) and five outlying IM pilot test monitoring points (PMP4, PMP5, PMP6, PMP7, PMP9; Figure 1.2); and (2) Twice yearly sampling of five IM pilot test monitoring points inside the injection area (PMP1-PMP3, PMP8, MW02; Figure 1.2). With the approval of the KDHE (2009), the initial groundwater sampling for VOCs and geochemical analyses under the interim monitoring plan outlined above was conducted in 2009 (Argonne 2010). The present report documents the findings of the 2010 monitoring events, conducted on April 5 and September 19-21, 2010.« less
Public School Finance Problems in Texas. An Interim Report.
ERIC Educational Resources Information Center
Texas Research League, Austin.
The U.S. District Court ruling in Rodriguez vs San Antonio Independent School District, which struck down Texas' school finance system as inequitable and unconstitutional, provided the impetus for publishing this interim report. The report documents the growing cost of State-supported public school programs--the primary concern prior to the…
ERIC Educational Resources Information Center
United Nations Economic and Social Council, New York, NY.
This interim report, commissioned by UNICEF, emphasizes the value of nonformal educational programs to educationally deprived rural children and youth in developing countries. The first set of basic findings and recommendations arising from this extensive international research study is presented. Organized into five chapters, the text includes…
System architecture for the Canadian interim mobile satellite system
NASA Technical Reports Server (NTRS)
Shariatmadar, M.; Gordon, K.; Skerry, B.; Eldamhougy, H.; Bossler, D.
1988-01-01
The system architecture for the Canadian Interim Mobile Satellite Service (IMSS) which is planned for commencement of commercial service in late 1989 is reviewed. The results of an associated field trial program which was carried out to determine the limits of coverage and the preliminary performance characteristics of the system are discussed.
To Have and to Hold: Reflections of an Interim Director
ERIC Educational Resources Information Center
Hibl, Lisa M.
2018-01-01
Leading a long-established LLC as an Interim Director poses particular challenges and rewards. Uncertainties abound for the program and for the individual. Professionally speaking, taking on the hybrid role of faculty/ administrator can be both difficult and exciting. Ultimately, the solutions are in the details. Listening carefully to students,…
Evaluation of Hose in Hose Transfer Line Service Life for Hanfords Interim Stabilization Program
DOE Office of Scientific and Technical Information (OSTI.GOV)
TORRES, T.D.
RPP-6153, Engineering Task Plan for Hose-in-Hose Transfer System for the Interim Stabilization Program (Torres, 2000a), defines the programmatic goals, functional requirements, and technical criteria for the development and subsequent installation of waste transfer line equipment to support Hanford's Interim Stabilization Program. RPP-6028, Specification for Hose in Hose Transfer Lines for Hanford's Interim Stabilization Program (Torres, 2000b), has been issued to define the specific requirements for the design, manufacture, and verification of transfer line assemblies for specific waste transfer applications associated with Interim Stabilization. Included in RPP-6028 are tables defining the chemical constituents of concern to which transfer lines will bemore » exposed. Current Interim Stabilization Program planning forecasts that the at-grade transfer lines will be required to convey pumpable waste for as much as three years after commissioning, RPP-6028 Section 3.2.7. Performance Incentive Number ORP-05 requires that all the Single Shell Tanks be Interim Stabilized by September 30, 2003. The Tri-Party Agreement (TPA) milestone M-41-00, enforced by a federal consent decree, requires all the Single Shell Tanks to be Interim stabilized by September 30, 2004. By meeting the Performance Incentive the TPA milestone is met. Prudent engineering dictates that the equipment used to transfer waste have a life in excess of the forecasted operational time period, with some margin to allow for future adjustments to the planned schedule. This document evaluates the effective service life of the Hose-in-Hose Transfer Lines, based on information submitted by the manufacturer, published literature and calculations. The effective service life of transfer line assemblies is a function of several factors. Foremost among these are the hose material's resistance to the harmful effects of process fluid characteristics, ambient environmental conditions, exposure to ionizing radiation and the manufacturer's stated shelf life. In order to determine the transfer line service life this evaluation examines the certification of shelf life, the certification of chemical compatibility with waste, catalog information of ambient ratings and published literature on the effects of exposure to ionizing radiation on the mechanical properties of elastomeric materials. During initial hose procurements, the hose-in-hose transfer line vendor River Bend Hose Specialty (RBHS) submitted a letter, dated 6/8/00, which recommended the service and shelf life of the hose to be seven years. In submittals for later hose procurements, RBHS submitted a letter, dated 11/6/00, which recommended the service life of the hose to be three years. This submittal was followed by documentation, on 2/14/01, which submitted new storage requirements and restated the seven year shelf life. RBHS revised their original hose service life estimate to a more conservative three years due to concerns over the effects of chemicals in transferred waste. The above mentioned submittals from RBHS are the primary drivers of the three year service life limit established by this document.« less
2005-03-25
This interim final rule with comment period adopts the substance of the April 15, 2004 temporary interim amendment (TIA) 00-1 (101), Alcohol Based Hand Rub Solutions, an amendment to the 2000 edition of the Life Safety Code, published by the National Fire Protection Association (NFPA). This amendment will allow certain health care facilities to place alcohol-based hand rub dispensers in egress corridors under specified conditions. This interim final rule with comment period also requires that nursing facilities install smoke detectors in resident rooms and public areas if they do not have a sprinkler system installed throughout the facility or a hard-wired smoke detection system in those areas.
ERIC Educational Resources Information Center
Goertz, Margaret E.; Olah, Leslie Nabors; Riggan, Matthew
2009-01-01
The purpose of this exploratory study is to examine the use of interim assessments and the policy supports that promote use to improve instruction, focusing on elementary school mathematics. The authors use the term "interim assessments" to refer to assessments that a) evaluate student knowledge and skills, typically within a limited…
NASA Technical Reports Server (NTRS)
Davidson, Frederic M.; Sun, Xiaoli; Field, Christopher T.
1994-01-01
This interim report consists of two reports: 'Space Radiation Effects on Si APDs for GLAS' and 'Computer Simulation of Avalanche Photodiode and Preamplifier Output for Laser Altimeters.' The former contains a detailed description of our proton radiation test of Si APD's performed at the Brookhaven National Laboratory. The latter documents the computer program subroutines which were written for the upgrade of NASA's GLAS simulator.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-09-01
This document describes the environmental monitoring program at the Hazelwood Interim Storage Site (HISS) and surrounding area, implementation of the program, and monitoring results for 1991. Environmental monitoring of HISS began in 1984 when the site was assigned to the US Department of Energy (DOE) as part of the decontamination research and development project authorized by Congress under the 1984 Energy and Water Development Appropriations Act. DOE placed responsibility for HISS under the Formerly Utilized Sites Remedial Action Program (FUSRAP), a DOE program to decontaminate or otherwise control sites where residual radioactive materials remain from the early years of themore » nation's atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The environmental monitoring program at HISS includes sampling networks for radon concentrations in air; external gamma radiation exposure; and radium-226, thorium-230, and total uranium concentrations in surface water, sediment, and groundwater. Additionally, several nonradiological parameters are measured in groundwater. Monitoring results are compared with applicable Environmental Protection Agency standards, DOE derived concentration guides (DCGs), dose limits, and other requirements in DOE orders. Environmental standards and DCGs are established to protect public health and the environment.« less
Structural Tailoring of Advanced Turboprops (STAT)
NASA Technical Reports Server (NTRS)
Brown, Kenneth W.
1988-01-01
This interim report describes the progress achieved in the structural Tailoring of Advanced Turboprops (STAT) program which was developed to perform numerical optimizations on highly swept propfan blades. The optimization procedure seeks to minimize an objective function, defined as either direct operating cost or aeroelastic differences between a blade and its scaled model, by tuning internal and external geometry variables that must satisfy realistic blade design constraints. This report provides a detailed description of the input, optimization procedures, approximate analyses and refined analyses, as well as validation test cases for the STAT program. In addition, conclusions and recommendations are summarized.
Interim evaluation of the Tier 1 Program of Project P.A.T.H.S.: continuation of evidence.
Shek, Daniel T L; Yu, Lu; Chan, Alex C W
2012-01-17
An interim evaluation study was conducted to understand the implementation of the Tier 1 Program of Project P.A.T.H.S. (Positive Adolescent Training through Holistic Social Programmes) in the 2008/09 school year. One hundred and twenty-eight schools were randomly selected to provide information on the implementation details of the program via interviews, telephone interviews and self-completed questionnaires. Results showed that a majority of the workers perceived that the students had positive responses to the program and the program was helpful to the students. Program workers' views toward the implementation of the Tier 1 Program were positive across different grades and program implementation modes. In conjunction with previous studies, the present findings suggest that the Tier 1 Program of Project P.A.T.H.S. is well received by different stakeholders.
Research study on materials processing in space Skylab experiment M553 - sphere forming
NASA Technical Reports Server (NTRS)
Johnson, P. C.; Peters, E. T.; Wechsler, A. E.
1973-01-01
A research program was conducted to study the solidification of metals in the form of small spheres both in the one gravity environment of the earth laboratory and the low gravity environment of KC-135 trajectory flights and the Skylab 1/2 mission. The program had three phases. The details of the results of this program are contained in interim reports prepared at the conclusion of each of the three phases. This final report is intended to summarize the efforts and results described in detail in each of these interim reports, with particular emphasis on the differences observed between the ground-based and Skylab flight specimens.
NIITEK-NVESD AMDS program and interim field-ready system
NASA Astrophysics Data System (ADS)
Hibbard, Mark W.; Etebari, Ali
2010-04-01
NIITEK (Non-Intrusive Inspection Technology, Inc) develops and fields vehicle-mounted mine and buried threat detection systems. Since 2003, the NIITEK has developed and tested a remote robot-mounted mine detection system for use in the NVESD AMDS program. This paper will discuss the road map of development since the outset of the program, including transition from a data collection platform towards a militarized field-ready system for immediate use as a remote countermine and buried threat detection solution with real-time autonomous threat classification. The detection system payload has been integrated on both the iRobot Packbot and the Foster-Miller Talon robot. This brief will discuss the requirements for a successful near-term system, the progressive development of the system, our current real-time capabilities, and our planned upgrades for moving into and supporting field testing, evaluation, and ongoing operation.
ERIC Educational Resources Information Center
Granville, Arthur; And Others
This interim report re-examines data on instrument suitability, comparability of groups, and adequacy of sample size in Year III of the process evaluation of Project Developmental Continuity (PDC) and offers preliminary recommendations concerning the feasibility of continuing the impact study. PDC is a Head Start demonstration program aimed at…
ERIC Educational Resources Information Center
Granville, Arthur C.; Love, John M.
This brief report summarizes the analysis and conclusions presented in detail in Interim Report VI regarding the feasibility of conducting a longitudinal study of Project Developmental Continuity (PDC). This project is a Head Start demonstration program aimed at providing educational and developmental continuity between children's Head Start and…
ERIC Educational Resources Information Center
Rochester City School District, NY.
This is an interim report of the second full year of the "Fifteen Point Plan." Although majority of comparisons between groups shows no significant statistical differences, differentials in achievement may become more noticeable as the program effects are reinforced with time, and through cumulative experience. From data analyzed after…
Environmental Quality Technology Demonstration, Evaluation and Transfer Activities
1996-12-02
and Appropriate Requirements) and ARAR support documentation for interim and final Installation Restoration Program (IRP) remedial actions . During the...Relevant and Appropriate Requirements (ARARs) for Fort Devens , Massachusetts. Delivered Federal Environmental Legislative Power Curve in hard copy and... Remedial Actions . Delivered revised tables for Desk Guide on Interpretation of Applicable or Relevant and Appropriate Requirements — Interim Draft
76 FR 56708 - Ohio: Final Authorization of State Hazardous Waste Management Program Revision
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-14
.... January 4, 1989, 54 FR 246.... NESHAPS: Final Standards for May 14, 2001, 66 FR 24270..... OAC 3745-50-41...; Checklist 188.1. NESHAPS: Interim Standards for February 13, 2002, 67 FR 6792. OAC 3745-50-44; 3745-50-66... Waste Combustors 2009. (Interim Standards Rule); Checklist 197. NESHAPS: Standards for Hazardous...
75 FR 31609 - Conservation Stewardship Program
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-03
...Section 2301 of the Food, Conservation, and Energy Act of 2008 (2008 Act) amended the Food Security Act of 1985 to establish the Conservation Stewardship Program (CSP). On July 29, 2009, the Natural Resources Conservation Service (NRCS) published an interim final rule for CSP with a 60-day public comment period. On September 21, 2009, the public comment period was extended 30 days. NRCS is publishing a final rule that addresses the comments received on the interim final rule and makes other minor adjustments to improve clarity of the rule.
Preventive maintenance study : interim report.
DOT National Transportation Integrated Search
2017-09-01
This interim report details the performance of 69 test sites treated with various preventive maintenance treatments. The maintenance treatments applied included crack sealing, full lane chip sealing, wheel path chip sealing, dig outs (mill and fill),...
NASA Technical Reports Server (NTRS)
Friedl, Randall R. (Editor)
1997-01-01
This first interim assessment of the subsonic assessment (SASS) project attempts to summarize concisely the status of our knowledge concerning the impacts of present and future subsonic aircraft fleets. It also highlights the major areas of scientific uncertainty, through review of existing data bases and model-based sensitivity studies. In view of the need for substantial improvements in both model formulations and experimental databases, this interim assessment cannot provide confident numerical predictions of aviation impacts. However, a number of quantitative estimates are presented, which provide some guidance to policy makers.
Code of Federal Regulations, 2011 CFR
2011-07-01
...) through (k) of this section explain when the budget, interim emissions, and hot-spot tests are required... § 93.115 Project from a conforming plan and TIP § 93.116 CO, PM10, and PM2.5 hot-spots. § 93.117 PM10... Currently conforming plan and TIP § 93.116 CO, PM10, and PM2.5 hot-spots. § 93.117 PM10 and PM2.5 control...
Code of Federal Regulations, 2010 CFR
2010-07-01
...) through (k) of this section explain when the budget, interim emissions, and hot-spot tests are required... § 93.115 Project from a conforming plan and TIP § 93.116 CO, PM10, and PM2.5 hot-spots. § 93.117 PM10... Currently conforming plan and TIP § 93.116 CO, PM10, and PM2.5 hot-spots. § 93.117 PM10 and PM2.5 control...
ERIC Educational Resources Information Center
Granville, Arthur C.; And Others
This executive summary presents the major findings of Interim Report III, which reports preliminary evaluation of Project Developmental Continuity (PDC). A Head Start demonstration program, PDC is aimed at promoting greater educational and developmental continuity as children make the transition from preschool to school. The report addresses three…
ERIC Educational Resources Information Center
Granville, Arthur C.; And Others
This interim report of a pilot year impact study on evaluation methodology is part of a series of documents on the evaluation of Project Developmental Continuity, a Head Start demonstration program aimed at promoting educational and developmental continuity between children's Head Start and primary school experiences. This report deals with…
A Model Project in Career Education, K-12. Interim Report, December 1974.
ERIC Educational Resources Information Center
Wyoming State Dept. of Education, Cheyenne.
The document presents an interim report of a project to establish career education programs for K-12 students in the Natrona County School District of Casper, Wyoming. Project activities were divided into: (1) career awareness, grades K-6; (2) career exploration, grades 7-9; (3) career preparation, grades 10-12; and (4) guidance. To meet the…
ERIC Educational Resources Information Center
Frazier, Don
The major purpose of this study was to identify unique effects of cooperative vocational education. This interim report is of results of the analyses of existing data bases. Comparisons of cooperative and non-cooperative vocational programs are made on the following variables: enrollments by age, sex and race, school status, work status,…
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-07-01
The module presents the requirements for groundwater monitoring at interim status and permitted treatment, storage, and disposal facilities (TSDFs) under the Resource Conservation and Recovery Act (RCRA). The goal of the module is to explain the standards and specific requirements for groundwater monitoring programs at interim status and permitted facilities.
1976-01-01
orifices A,f and A„ respectively) were conducted, all at a (.ornpression chamber overpressure of about 2 psi. During the current testing program, an...actually reflect a pressure decrease with time derived from the modified exponencial relationship given in Eq. 2-14. Blast Flow vs. LDFF Flow Through...indicating the presence of strong eddies and counter currents . »"JCüat^Liöt -r*"- aK.m.ju.J’ aBBtflbsSii ^’ :•.. ’ ä l 1 2 \\ 2 Lzi .3
2005-09-21
The Department is publishing this interim final rule to implement sections 711 and 715 of the Ronald W. Reagan National Defense Authorization Act for Fiscal Year 2005 (NDAA-05), Public Law 108-375. Specifically, that legislation makes young dependents of deceased Service members eligible for enrollment in the TRICARE Dental Program when the child was not previously enrolled because of age, and authorizes post-graduate dental residents in a dental treatment facility of the uniformed services under a graduate dental education program accredited by the American Dental Association to provide dental treatment to dependents who are 12 years of age or younger and who are covered by a dental plan established under 10 U.S.C. 1076a. This rule also corrects certain references in 32 CFR 199.13. The rule is being published as an interim final rule with comment period in order to comply with statutory effective dates. Public comments are invited and will be considered for possible revisions to the final rule.
Progress and future direction for the interim safe storage and disposal of Hanford high-level waste
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kinzer, J.E.; Wodrich, D.D.; Bacon, R.F.
This paper describes the progress made at the largest environmental cleanup program in the United States. Substantial advances in methods to start interim safe storage of Hanford Site high-level wastes, waste characterization to support both safety- and disposal-related information needs, and proceeding with cost-effective disposal by the U.S. Department of Energy (DOE) and its Hanford Site contractors, have been realized. Challenges facing the Tank Waste Remediation System (TWRS) Program, which is charged with the dual and parallel missions of interim safe storage and disposal of the high-level tank waste stored at the Hanford Site, are described. In these times ofmore » budget austerity, implementing an ongoing program that combines technical excellence and cost effectiveness is the near-term challenge. The technical initiatives and progress described in this paper are made more cost effective by DOE`s focus on work force productivity improvement, reduction of overhead costs, and reduction, integration and simplification of DOE regulations and operations requirements to more closely model those used in the private sector.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mays, S.E.; Poloski, J.P.; Sullivan, W.H.
1982-07-01
This report describes a risk study of the Browns Ferry, Unit 1, nuclear plant. The study is one of four such studies sponsored by the NRC Office of Research, Division of Risk Assessment, as part of its Interim Reliability Evaluation Program (IREP), Phase II. This report is contained in four volumes: a main report and three appendixes. Appendix C generally describes the methods used to estimate accident sequence frequency values. Information is presented concerning the approach, example collection, failure data, candidate dominant sequences, uncertainty analysis, and sensitivity analysis.
Effects of Interim Assessments on Student Achievement: Evidence from a Large-Scale Experiment
ERIC Educational Resources Information Center
Konstantopoulos, Spyros; Miller, Shazia R.; van der Ploeg, Arie; Li, Wei
2016-01-01
We use data from a large-scale, school-level randomized experiment conducted in 2010-2011 in public schools in Indiana. Our sample includes more than 30,000 students in 70 schools. We examine the impact of two interim assessment programs (i.e., mCLASS in Grades K-2 and Acuity in Grades 3--8) on mathematics and reading achievement. Two-level models…
Natalie A. Bolon; Christopher S. Hansen-Murray; Richard W. Haynes
1995-01-01
Implications of the interim comprehensive strategy for improved Pacific salmon and steelhead habitat management (PACFISH) were estimated for those Bureau of Land Management (BLM) districts and National Forest System (NFS) lands west of the Rocky Mountains that have anadromous fish. The physical impacts and associated mitigation costs from implementing the PACFISH...
Code of Federal Regulations, 2011 CFR
2011-04-01
... 25 Indians 1 2011-04-01 2011-04-01 false Establishment of an interim fiscal year 1980 operation and maintenance fund for contract schools. 39.1201 Section 39.1201 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR EDUCATION THE INDIAN SCHOOL EQUALIZATION PROGRAM Contract School Operation and Maintenance Fund § 39.1201 Establishment of...
Code of Federal Regulations, 2013 CFR
2013-04-01
... 25 Indians 1 2013-04-01 2013-04-01 false Establishment of an interim fiscal year 1980 operation and maintenance fund for contract schools. 39.1201 Section 39.1201 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR EDUCATION THE INDIAN SCHOOL EQUALIZATION PROGRAM Contract School Operation and Maintenance Fund § 39.1201 Establishment of...
Code of Federal Regulations, 2012 CFR
2012-04-01
... 25 Indians 1 2012-04-01 2011-04-01 true Establishment of an interim fiscal year 1980 operation and maintenance fund for contract schools. 39.1201 Section 39.1201 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR EDUCATION THE INDIAN SCHOOL EQUALIZATION PROGRAM Contract School Operation and Maintenance Fund § 39.1201 Establishment of a...
Code of Federal Regulations, 2014 CFR
2014-04-01
... 25 Indians 1 2014-04-01 2014-04-01 false Establishment of an interim fiscal year 1980 operation and maintenance fund for contract schools. 39.1201 Section 39.1201 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR EDUCATION THE INDIAN SCHOOL EQUALIZATION PROGRAM Contract School Operation and Maintenance Fund § 39.1201 Establishment of...
Interim Service ISDN Satellite (ISIS) network model for advanced satellite designs and experiments
NASA Technical Reports Server (NTRS)
Pepin, Gerard R.; Hager, E. Paul
1991-01-01
The Interim Service Integrated Services Digital Network (ISDN) Satellite (ISIS) Network Model for Advanced Satellite Designs and Experiments describes a model suitable for discrete event simulations. A top-down model design uses the Advanced Communications Technology Satellite (ACTS) as its basis. The ISDN modeling abstractions are added to permit the determination and performance for the NASA Satellite Communications Research (SCAR) Program.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-11-01
The module presents the requirements for groundwater monitoring at interim status and permitted treatment, storage, and disposal facilities. It describes the groundwater monitoring criteria for interim status and permitted facilities. It explains monitoring well placement and outlines the three stages of the groundwater monitoring program for permitted facilities.
ERIC Educational Resources Information Center
Seftor, Neil S.; Calcagno, Juan Carlos
2010-01-01
This final report updates the report "Upward Bound Math-Science: Program Description and Interim Impact Estimates" published in 2007 (Olsen et al. 2007). The 2007 interim report contained descriptive findings from a survey of Upward Bound Math-Science (UBMS) grantees from the late 1990s at the time of the study's initiation and impact estimates…
Making the Transition: Interim Results of the National Guard Youth ChalleNGe Evaluation
ERIC Educational Resources Information Center
Millenky, Megan; Bloom, Dan; Dillon, Colleen
2010-01-01
Young people who drop out of high school face long odds of success in a labor market that increasingly values education and skills. This report presents interim results from a rigorous, ongoing evaluation of the National Guard Youth ChalleNGe Program, which aims to "reclaim the lives of at-risk youth" who have dropped out of high school.…
ERIC Educational Resources Information Center
Millenky, Megan; Bloom, Dan; Dillon, Colleen
2010-01-01
Young people who drop out of high school face long odds of success in a labor market that increasingly values education and skills. This report presents interim results from a rigorous, ongoing evaluation of the National Guard Youth ChalleNGe Program, which aims to "reclaim the lives of at-risk youth" who have dropped out of high school. ChalleNGe…
Aircraft Wake Vortices: An Annotated Bibliography (1923-1990)
1991-01-01
Generated by Large Jet- Transport Aircraft; (2) Results of the Boeing Company Wake Turbulence Test Program; (3) Meas"’rements of the Vortex Wake...Administration and the Boeing Company . The objective was to update the interim air traffic separation standards issued on 21 January 1970 restricting the airspace...VORTEX TI<AN; I ORT AN) COMPARI.SON WITI EXI’ER I M ENT," FAA-RD-74-74. [ and 74.11, April 19/4, Lockheed Missiles & Space Company , Hlintsvi lie, A,. A
ERIC Educational Resources Information Center
National Univ. Extension Association, Washington, DC.
In 1968, a national planning conference, under the joint sponsorship of 34 organizations responsing to continuing education needs, created the National Task Force to determine the feasibility of a uniform unit of measurement and develop a proposal for field testing the concept. Stressing that continuing education units should supplement, not…
Computer Science 205. Interim Guide, 1983.
ERIC Educational Resources Information Center
Manitoba Dept. of Education, Winnipeg.
This guide to a 4-unit, required high school computer science course emphasizes problem solving and computer programming and is designed for use with a variety of hardware configurations and programming languages. An overview covers the program rationale, goals and objectives, program design and description, program implementation, time allotment,…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-01
... anti-sweat heaters. Therefore, it is ordered that: The application for interim waiver filed by Samsung... control anti-sweat heaters according to the alternate test procedure as set forth in section IV...
40 CFR 94.12 - Interim provisions.
Code of Federal Regulations, 2014 CFR
2014-07-01
... differences in testing will not affect NOX emission rates. (g) Flexibility for engines over 560kW... EMISSIONS FROM MARINE COMPRESSION-IGNITION ENGINES General Provisions for Emission Regulations for Compression-Ignition Marine Engines § 94.12 Interim provisions. This section contains provisions that apply...
40 CFR 94.12 - Interim provisions.
Code of Federal Regulations, 2010 CFR
2010-07-01
... differences in testing will not affect NOX emission rates. (g) Flexibility for engines over 560kW...) CONTROL OF EMISSIONS FROM MARINE COMPRESSION-IGNITION ENGINES General Provisions for Emission Regulations for Compression-Ignition Marine Engines § 94.12 Interim provisions. This section contains provisions...
40 CFR 94.12 - Interim provisions.
Code of Federal Regulations, 2013 CFR
2013-07-01
... differences in testing will not affect NOX emission rates. (g) Flexibility for engines over 560kW...) CONTROL OF EMISSIONS FROM MARINE COMPRESSION-IGNITION ENGINES General Provisions for Emission Regulations for Compression-Ignition Marine Engines § 94.12 Interim provisions. This section contains provisions...
40 CFR 94.12 - Interim provisions.
Code of Federal Regulations, 2012 CFR
2012-07-01
... differences in testing will not affect NOX emission rates. (g) Flexibility for engines over 560kW...) CONTROL OF EMISSIONS FROM MARINE COMPRESSION-IGNITION ENGINES General Provisions for Emission Regulations for Compression-Ignition Marine Engines § 94.12 Interim provisions. This section contains provisions...
40 CFR 94.12 - Interim provisions.
Code of Federal Regulations, 2011 CFR
2011-07-01
... differences in testing will not affect NOX emission rates. (g) Flexibility for engines over 560kW...) CONTROL OF EMISSIONS FROM MARINE COMPRESSION-IGNITION ENGINES General Provisions for Emission Regulations for Compression-Ignition Marine Engines § 94.12 Interim provisions. This section contains provisions...
NICMOS Cycles 13 and 14 Calibration Plans
NASA Astrophysics Data System (ADS)
Arribas, Santiago; Bergeron, Eddie; de Jong, Roeof; Malhotra, Sangeeta; Mobasher, Bahram; Noll, Keith; Schultz, Al; Wiklind, Tommy; Xu, Chun
2005-11-01
This document summarizes the NICMOS Calibration Plans for Cycles 13 and 14. These plans complement the SMOV3b, the Cycle 10 (interim), and the Cycles 11 and 12 (regular) calibration programs executed after the installation of the NICMOS Cooling System (NCS).. These previous programs have shown that the instrument is very stable, which has motivated a further reduction in the frequency of the monitoring programs for Cycle 13. In addition, for Cycle 14 some of these programs were slightly modified to account for 2 Gyro HST operations. The special calibrations on Cycle 13 were focussed on a follow up of the spectroscopic recalibration initiated in Cycle 12. This program led to the discovery of a possible count rate non-linearity, which has triggered a special program for Cycle 13 and a number of subsequent tests and calibrations during Cycle 14. At the time of writing this is a very active area of research. We also briefly comment on other calibrations defined to address other specific issues like: the autoreset test, the SPAR sequences tests, and the low-frequency flat residual for NIC1. The calibration programs for the 2-Gyro campaigns are not included here, since they have been described somewhere else. Further details and updates on specific programs can be found via the NICMOS web site.
IVHS Countermeasures For Rear-End Collisions, Task 2 - Functional Goals, Interim Report
DOT National Transportation Integrated Search
1996-05-01
THE ATTACHED REPORT IS FROM THE NHTSA SPONSORED PROGRAM, "IVHS COUNTERMEASURES FOR REAR-END COLLISIONS," CONTRACT #DTNH22-93-C-07326. : THIS PROGRAM?S PRIMARY OBJECTIVE IS THE DEVELOPMENT OF PRACTICAL PERFORMANCE : GUIDELINES OR SPECIFICATIONS FOR RE...
1979-08-21
Appendix s - Outline and Draft Material for Proposed Triservice Interim Guideline on Application of Software Acceptance Criteria....... 269 Appendix 9...AND DRAFT MATERIAL FOR PROPOSED TRISERVICE INTERIM GUIDELINE ON APPLICATION OF SOFTWARE ACCEPTANCE CRITERIA I I INTRODUCTION The purpose of this guide...contract item (CPCI) (code) 5. CPCI test plan 6. CPCI test procedures 7. CPCI test report 8. Handbooks and manuals. Al though additional material does
Commentary: Interim leadership of academic departments at U.S. medical schools.
Grigsby, R Kevin; Aber, Robert C; Quillen, David A
2009-10-01
Medical schools and teaching hospitals are experiencing more frequent turnover of department chairs. Loss of a department chair creates instability in the department and may have a negative effect on the organization at large. Interim leadership of academic departments is common, and interim chairs are expected to immediately demonstrate skills and leadership abilities. However, little is known about how persons are prepared to assume the interim chair role. Newer competencies for effective leadership include an understanding of the business of medicine, interpersonal and communication skills, the ability to deal with conflict and solve adaptive challenges, and the ability to build and work on teams. Medical schools and teaching hospitals need assistance to meet the unique training and support needs of persons serving as interim leaders. For example, the Association of American Medical Colleges and individual chair societies can develop programs to allow current chairs to reflect on their present positions and plan for the future. Formal leadership training, mentorship opportunities, and conscientious succession planning are good first steps in preparing to meet the needs of academic departments during transitions in leadership. Also, interim leadership experience may be useful as a means for "opening the door" to underrepresented persons, including women, and increasing the diversity of the leadership team.
Leveraging Available Data to Support Extension of Transportation Packages Service Life
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dunn, K.; Abramczyk, G.; Bellamy, S.
Data obtained from testing shipping package materials have been leveraged to support extending the service life of select shipping packages while in nuclear materials transportation. Increasingly, nuclear material inventories are being transferred to an interim storage location where they will reside for extended periods of time. Use of a shipping package to store nuclear materials in an interim storage location has become more attractive for a variety of reasons. Shipping packages are robust and have a qualified pedigree for their performance in normal operation and accident conditions within the approved shipment period and storing nuclear material within a shipping packagemore » results in reduced operations for the storage facility. However, the shipping package materials of construction must maintain a level of integrity as specified by the safety basis of the storage facility through the duration of the storage period, which is typically well beyond the one year transportation window. Test programs have been established to obtain aging data on materials of construction that are the most sensitive/susceptible to aging in certain shipping package designs. The collective data are being used to support extending the service life of shipping packages in both transportation and storage.« less
DOT National Transportation Integrated Search
2013-07-16
The Georgia Department of Transportation (GDOT) is transitioning from empirical design procedures to the MEPDG : procedure for designing new and rehabilitated highway pavements. GDOT currently uses the 1972 AASHTO Interim : Guide for Design of Paveme...
DOT National Transportation Integrated Search
1998-01-01
This interim report describes the progress during the first year of a project to develop robotics hardware for nondestructive evaluation of steel structures. The project objectives are to (1) develop and test an improved prototype (POLECAT-II) crawli...
Mullen Conley, Kathleen; Juhl Majersik, Jennifer; Gonzales, Nicole R; Maddox, Katherine E; Pary, Jennifer K; Brown, Devin L; Moyé, Lemuel A; Espinosa, Nina; Grotta, James C; Morgenstern, Lewis B
2010-01-01
The Kids Identifying and Defeating Stroke (KIDS) project is a 3-year prospective, randomized, controlled, multiethnic school-based intervention study. Project goals include increasing knowledge of stroke signs and treatment and intention to immediately call 911 among Mexican American (MA) and non-Hispanic White (NHW) middle school students and their parents. This article describes the design, implementation, and interim evaluation of this theory-based intervention. Intervention students received a culturally appropriate stroke education program divided into four 50-minute classes each year during the sixth, seventh, and eighth grades. Each class session also included a homework assignment that involved the students' parents or other adult partners. Interim-test results indicate that this educational intervention was successful in improving students' stroke symptom and treatment knowledge and intent to call 911 upon witnessing a stroke compared with controls. The authors conclude that this school-based educational intervention to reduce delay time to hospital arrival for stroke shows early promise.
One Week of Public Television, April 1972. Number Seven.
ERIC Educational Resources Information Center
Katzman, Natan
Seventh in a series of annual surveys, this interim report describes analyses of the programing schedules of public television broadcasters during one week in April, 1972. Results are reported for four different types of programing: instructional programing, Children's Television Workshop productions, news and public affairs programing, and…
FY 1987 current fiscal year work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This Current Year Work Plan presents a detailed description of the activities to be performed by the Joint Integration Office during FY87. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance, task monitoring, informationmore » gathering and task reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of program status reports for DOE. Program Analysis is performed by the JIO to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. This work plan includes: system analyses, requirements analyses, interim and procedure development, legislative and regulatory analyses, dispatch and traffic analyses, and data bases.« less
NASA/DERA Collaborative Program
NASA Technical Reports Server (NTRS)
Whitefield, Phillip D.; Hagen, Donald E.; Wormhoudt, Jody C.; Miake-Lye, Richard C.; Brundish, Kevin; Wilson, Christopher W.; Wey, Chowen (Technical Monitor)
2002-01-01
This report is an interim report. The work reported are the results from the combustor testing, the first phase of testing in the DERA/NASA collaborative program. A program of work was developed by DERA and NASA utilizing specialist facilities within the UK, and specialist measurement techniques developed within the U.S. Under a Memorandum of Understanding (MoU) between the UK and U.S. governments, the joint UK/U.S. funded program commenced. The objective of the program was to make combustor and engine exit plane emissions measurements, including particulate and sulphur measurements, for kerosene fuels with different sulphur levels. The combustor test program was performed in August/September 2000. Although probe issues complicated the test program, a consistent set of data, including CO, NO(x), NO, NO2, CO2, O2, smoke number, particulate number density and size distribution, SO2, SO3 and HONO were collected at the exit plane of the DERA TRACE engine combustor. A second probe was utilized to measure spatial location of CO, NO(x), NO, NO2 and CO2 concentrations. Data are therefore available for development of aerosol, particulate and aerosol precursor chemistry sub-models for inclusion into CFD. Inlet boundary conditions have been derived at the exit of the combustion system for the modelling of the DERA TRACE engine. The second phase of the program is to perform identical measurements at the engine exit, to allow a full data set to be available. This will be performed in July 2001 at the Glenn test facility, DERA Pyestock.
Castelnuovo, Gianluca; Manzoni, Gian Mauro; Cuzziol, Paola; Cesa, Gian Luca; Corti, Stefania; Tuzzi, Cristina; Villa, Valentina; Liuzzi, Antonio; Petroni, Maria Letizia; Molinari, Enrico
2011-03-04
Obesity increases the risk of many health complications such as hypertension, coronary heart disease and type 2 diabetes, needs long-lasting treatment for effective results and involves high public and private care-costs. Therefore, it is imperative that enduring and low-cost clinical programs for obesity and related co-morbidities are developed and evaluated. Information and communication technologies (ICT) can help clinicians to deliver treatment in a cost-effective and time-saving manner to a large number of obese individuals with co-morbidities. To examine ad interim effectiveness of a 12-month multidisciplinary telecare intervention for weight loss provided to obese patients with type 2 diabetes. A single-center randomized controlled trial (TECNOB study) started in December 2008. At present, 72 obese patients with type 2 diabetes have been recruited and randomly allocated to the TECNOB program (n=37) or to a control condition (n=39). However, only 34 participants have completed at least the 3-month follow-up and have been included in this ad interim analysis. 21 out of them have reached also the 6-month follow-up and 13 have achieved the end of the program. Study is still on-going. All participants attended 1-month inpatient intensive program that involved individualized medical care, diet therapy, physical training and brief psychological counseling. At discharge, participants allocated to the TECNOB program were instructed to use a weight-loss web-site, a web-based videoconference tool, a dietary software installed into their cellular phones and an electronic armband measuring daily steps and energy expenditure. Weight and disordered eating-related behaviors and cognitions (EDI-2) at entry to hospital, at discharge from hospital, at 3,6 and 12 months. Ad interim analysis of data from 34 participants showed no statistically significant difference between groups in weight change at any time-point. However, within-group analysis revealed significant reductions of initial weight at discharge from hospital, at 3 months, at 6 months but not at 12 months. Control group had higher scores in Interpersonal distrust at 12 months. This ad interim findings revealed that the effect of the inpatient treatment was high and probably overwhelmed the effect of the TECNOB intervention. Much statistical power and long-term follow-up may enhance the probability to detect the TECNOB effect over and above the great one exerted by the inpatient program.
Adaptive graph-based multiple testing procedures
Klinglmueller, Florian; Posch, Martin; Koenig, Franz
2016-01-01
Multiple testing procedures defined by directed, weighted graphs have recently been proposed as an intuitive visual tool for constructing multiple testing strategies that reflect the often complex contextual relations between hypotheses in clinical trials. Many well-known sequentially rejective tests, such as (parallel) gatekeeping tests or hierarchical testing procedures are special cases of the graph based tests. We generalize these graph-based multiple testing procedures to adaptive trial designs with an interim analysis. These designs permit mid-trial design modifications based on unblinded interim data as well as external information, while providing strong family wise error rate control. To maintain the familywise error rate, it is not required to prespecify the adaption rule in detail. Because the adaptive test does not require knowledge of the multivariate distribution of test statistics, it is applicable in a wide range of scenarios including trials with multiple treatment comparisons, endpoints or subgroups, or combinations thereof. Examples of adaptations are dropping of treatment arms, selection of subpopulations, and sample size reassessment. If, in the interim analysis, it is decided to continue the trial as planned, the adaptive test reduces to the originally planned multiple testing procedure. Only if adaptations are actually implemented, an adjusted test needs to be applied. The procedure is illustrated with a case study and its operating characteristics are investigated by simulations. PMID:25319733
Making the Most of Interim Assessment Data. Lessons from Philadelphia
ERIC Educational Resources Information Center
Christman, Jolley Bruce; Neild, Ruth Curran; Bulkley, Katrina; Blanc, Suzanne; Liu, Roseann; Mitchell, Cecily; Travers, Eva
2009-01-01
Under No Child Left Behind, urban school districts have increasingly turned to interim assessments, administered at regular intervals, to help gauge student progress in advance of annual state exams. These assessments have spawned growing debate among educators, assessment experts, and the testing industry: are they worth the significant…
Science 26: Teacher Resource Manual. Integrated Occupational Program. Interim 1991.
ERIC Educational Resources Information Center
Alberta Dept. of Education, Edmonton. Curriculum Branch.
The Integrated Occupation Science 26 Program is an optional program designed to allow students in Alberta, Canada to meet the credit requirements of the Certificate of Achievement and facilitate transfer to the General High School Diploma Program. This Teacher Resource Manual is provided to assist classroom teachers to implement the Science 26…
76 FR 10089 - Value-Added Producer Grant Program
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-23
..., business plans, and marketing strategies. The program will also provide working capital for expenses such as implementing an existing viable marketing strategy. The Agency will implement the program to meet... projects that develop mid-tier value marketing chains. DATES: This interim rule is effective March 25, 2011...
77 FR 31724 - Exchange Visitor Program-Summer Work Travel; Correction
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-30
... DEPARTMENT OF STATE 22 CFR Part 62 RIN 1400-AD14 [Public Notice 7902] Exchange Visitor Program--Summer Work Travel; Correction AGENCY: Department of State. ACTION: Interim final rule; correction SUMMARY: This document contains minor corrections to the Exchange Visitor Program--Summer Work Travel...
High resolution infrared datasets useful for validating stratospheric models
NASA Technical Reports Server (NTRS)
Rinsland, Curtis P.
1992-01-01
An important objective of the High Speed Research Program (HSRP) is to support research in the atmospheric sciences that will improve the basic understanding of the circulation and chemistry of the stratosphere and lead to an interim assessment of the impact of a projected fleet of High Speed Civil Transports (HSCT's) on the stratosphere. As part of this work, critical comparisons between models and existing high quality measurements are planned. These comparisons will be used to test the reliability of current atmospheric chemistry models. Two suitable sets of high resolution infrared measurements are discussed.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
In this report, the scope of the tests, the method of analysis, the results, and the conclusions are discussed. The first test indicated that the requirements generated by the Standard procedures and formulae appear to yield reasonable results, although some of the cost data provided as defaults in the Standard should be reevaluated. The second test provided experience that was useful in modifying the points compliance format, but did not uncover any procedural issues that would lead to unreasonable results. These conclusions are based on analysis using the Automated Residential Energy Standard (ARES) computer program, developed to simplify the processmore » of standards generation.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1991-09-01
Environmental monitoring of the US Department of Energy's (DOE) Maywood Interim Storage Site (MISS) and surrounding area began in 1984. MISS is part of the Formerly Utilized Sites Remedial Action Program (FUSRAP), a DOE program to decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation's atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The MISS Environmental monitoring programs was established to accommodate facility characteristics, applicable regulations, hazard potential, quantities and concentrations of materials released, extent and use of affected land and water, and localmore » public interest or concern. The environmental monitoring program at MISS includes sampling networks for radon concentrations in air; external gamma radiation exposure; and total uranium, radium-226, and thorium-232 concentrations in surface water, sediment, and groundwater. Additionally, several nonradiological parameters are measured in surface water, sediment, and groundwater. Monitoring results are compared with applicable Environmental Protection Agency (EPA) standards; federal, state, and local applicable or relevant and appropriate requirements (ARARs); and/or DOE derived concentration guidelines (DCGs). Environmental standards, ARARs, and DCGs are established to protect public health and the environment. Results from the 1990 environmental monitoring program show that concentrations of the contaminants of concern were all below applicable standards. Because the site is used only for interim storage and produces no processing effluents, all monitoring, except for radon and direct gamma radiation, was done on a quarterly basis. 18 refs., 17 figs., 28 tabs.« less
Terrestrial gravity data analysis for interim gravity model improvement
NASA Technical Reports Server (NTRS)
1987-01-01
This is the first status report for the Interim Gravity Model research effort that was started on June 30, 1986. The basic theme of this study is to develop appropriate models and adjustment procedures for estimating potential coefficients from terrestrial gravity data. The plan is to use the latest gravity data sets to produce coefficient estimates as well as to provide normal equations to NASA for use in the TOPEX/POSEIDON gravity field modeling program.
Wheel/Rail Noise and Vibration Control
DOT National Transportation Integrated Search
1974-05-01
Reported here are the interim results of a program under the UMTA Urban Rail Supporting Technology Program to develop a basic understanding of urban transit wheel/rail noise generation for application to the evaluation and improvement of wheel/rail n...
Evaluation of experimental flexible pavements : interim report no. 2.
DOT National Transportation Integrated Search
1975-01-01
A program of construction and performance evaluation of seven Virginia flexible pavements containing at least some experimental features is reported. The objective of the program is to evaluate the performance of the pavements incorporating new or ti...
Birch, Nick; Graham, Jon; Priestley, Tom; Heywood, Chris; Sakel, Mohamed; Gall, Angela; Nunn, Andrew; Signal, Nada
2017-06-19
The RAPPER II study investigates the feasibility, safety and acceptability of using the REX self-stabilising robotic exoskeleton in people with spinal cord injury (SCI) who are obligatory wheelchair users. Feasibility is assessed by the completion of transfer into the REX device, competency in achieving autonomous control and completion of upper body exercise in an upright position in the REX device. Safety is measured by the occurrence of serious adverse events. Device acceptability is assessed with a user questionnaire. RAPPER II is a prospective, multi-centre, open label, non-randomised, non-comparative cohort study in people with SCI recruited from neurological rehabilitation centres in the United Kingdom, Australia and New Zealand. This is the planned interim report of the first 20 participants. Each completed a transfer into the REX, were trained to achieve machine control and completed Timed Up and Go (TUG) tests as well as upper body exercises in standing in a single first time session. The time to achieve each task as well as the amount of assistance required was recorded. After finishing the trial tasks a User Experience questionnaire, exploring device acceptability, was completed. All participants could transfer into the REX. The mean transfer time was 439 s. Nineteen completed the exercise regime. Eighteen could achieve autonomous control of the REX, 17 of whom needed either no assistance or the help of just one therapist. Eighteen participants completed at least one TUG test in a mean time of 313 s, 15 with the assistance of just one therapist. The questionnaire demonstrated high levels of acceptability amongst users. There were no Serious Adverse Events. This first interim analysis of RAPPER II shows that it is feasible and safe for people with SCI to use the REX powered assisted walking device to ambulate and exercise in. Participants with tetraplegia and paraplegia could walk and perform a functional exercise program when standing needing only modest levels of assistance in most cases. User acceptability was high. ClinicalTrials.gov , NCT02417532 . Registered 11 April 2015.
Physics 200, 300 Interim Guide.
ERIC Educational Resources Information Center
Manitoba Dept. of Education, Winnipeg.
This guide, developed for the physics 200, 300 program in Manitoba, is designed to articulate with previous science courses; provide concepts, processes, and skills which will enable students to continue in physics-related areas; and relate physics to practical applications in everyday life. It includes a program overview (with program goals and…
Chemistry 200, 300 Interim Guide.
ERIC Educational Resources Information Center
Manitoba Dept. of Education, Winnipeg.
This guide, developed for the chemistry 200, 300 program in Manitoba, is designed to articulate with previous science courses, provide concepts, processes, and skills which will enable students to continue in chemistry-related areas, and relate chemistry to practical applications in everyday life. It includes a program overview (with program goals…
75 FR 39859 - Structure and Practices of the Video Relay Service Program
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-13
... FEDERAL COMMUNICATIONS COMMISSION 47 CFR Part 64 [CG Docket No. 10-51; FCC 10-88] Structure and Practices of the Video Relay Service Program AGENCY: Federal Communications Commission. ACTION: Interim rule... a summary of the Commission's Structure and Practices of the Video Relay Service Program, Order...
76 FR 47476 - Structure and Practices of the Video Relay Service Program
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-05
... FEDERAL COMMUNICATIONS COMMISSION 47 CFR Part 64 [CG Docket No. 10-51; FCC 11-118] Structure and Practices of the Video Relay Service Program AGENCY: Federal Communications Commission. ACTION: Interim rule... summary of the Commission's Structure and Practices of the Video Relay Service Program, Order (Order...
Linear Programming for Vocational Education Planning. Interim Report.
ERIC Educational Resources Information Center
Young, Robert C.; And Others
The purpose of the paper is to define for potential users of vocational education management information systems a quantitative analysis technique and its utilization to facilitate more effective planning of vocational education programs. Defining linear programming (LP) as a management technique used to solve complex resource allocation problems…
CMM Interim Check Design of Experiments (U)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Montano, Joshua Daniel
2015-07-29
Coordinate Measuring Machines (CMM) are widely used in industry, throughout the Nuclear Weapons Complex and at Los Alamos National Laboratory (LANL) to verify part conformance to design definition. Calibration cycles for CMMs at LANL are predominantly one year in length and include a weekly interim check to reduce risk. The CMM interim check makes use of Renishaw’s Machine Checking Gauge which is an off-the-shelf product simulates a large sphere within a CMM’s measurement volume and allows for error estimation. As verification on the interim check process a design of experiments investigation was proposed to test a couple of key factorsmore » (location and inspector). The results from the two-factor factorial experiment proved that location influenced results more than the inspector or interaction.« less
Evaluation of the Implementation of the Rural and Low-Income School (RLIS) Program: Interim Report
ERIC Educational Resources Information Center
Magill, Kathleen; Reeves, Cynthia; Hallberg, Kelly; Hinojosa, Trisha
2009-01-01
The Rural and Low-Income School (RLIS) program is part of the Rural Education Achievement Program (REAP) that was authorized under Title VI, Part B of the "Elementary and Secondary Act of 1965" ("ESEA"), as amended by the "No Child Left Behind Act of 2001" ("NCLB"). The RLIS program provides additional funds…
DOT National Transportation Integrated Search
2007-02-14
This final rule revises the regulations governing the development of metropolitan transportation plans and programs for urbanized areas, State transportation plans and programs and the regulations for Congestion Management Systems. The revision resul...
2015-12-01
institutional review board (IRB)-approved sequence was established for Delphi panel participants. The collection of data from the Delphi panel...The following year, the Office of the Inspector General Audit Division within the U.S. Department of Justice (DOJ) released an interim report on the...iacp_uaguidelines.pdf 11 Department of Justice, Office of the Inspector General, Audit Division, Interim Report on the Department of Justice’s Use and Support of
Abradable compressor and turbine seals, volume 1. [for turbofan engines
NASA Technical Reports Server (NTRS)
Sundberg, D. V.; Dennis, R. E.; Hurst, L. G.
1979-01-01
The application and advantages of abradable coatings as gas-path seals in a general aviation turbine engine were evaluated for use on the high-pressure compressor, the high-pressure turbine, and the low-pressure turbine shrouds. Topics covered include: (1) the initial selection of candidate materials for interim full-scale engine testing; (2) interim engine testing of the initially selected materials and additional candidate materials; (3) the design of the component required to adapt the hardware to permit full-scale engine testing of the most promising materials; (4) finalization of the fabrication methods used in the manufacture of engine test hardware; and (5) the manufacture of the hardware necessary to support the final full-scale engine tests.
MUC-4 Test Results and Analysis
1992-01-01
PAGE unclassified Standard Form 298 (Rev. 8-98) Prescribed by ANSI Std Z39-18 MUC3 MUC4 STEMS 15,285 INFLECTED FORMS 14,56 1 TOTALS est at 10,000...34 . As an indication of system development during MUC4 , we can compare our TST3 results with our results on th e MUC-4 interim test (TST2) . The relevant... MUC4 Interim Test) Summary Scores SLOT POS ACT COR PAR INC ICR IPA SPU MIS NON REC PRE OVG inc-total 529 1189 160 63 24 0 23 942 282 718 36 16 79 perp
Skylab program earth resources experiment package sensor performance evaluation, volume 1, (S190A)
NASA Technical Reports Server (NTRS)
Kenney, G. P.
1975-01-01
The results of S190A sensor performance evaluation are summarized based on data presented by all contributors to the sensor performance evaluation interim reports. Techniques used in sensor performance evaluation are discussed. Topics discussed include: performance degradation identified during the Skylab missions, S190A and EREP system anomalies that affected S190A performance, and the performance achieved, in terms of pertinent S190A parameters. Additional analyses include final performance analyses completed after submittal of the SL4 interim sensor performance evaluation reports, including completion of detailed analyses of basic performance parameters initiated during the interim report periods and consolidation analyses to reduce independent mission data (SL2, SL3, and SL4) to determine overall performance realized during all three Skylab missions.
77 FR 1862 - Mailing of Tickets Under the Ticket to Work Program
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-12
... Tickets Under the Ticket to Work Program AGENCY: Social Security Administration. ACTION: Interim final... Ticket to Work (Ticket) to disabled beneficiaries for participation in the Ticket to Work program (Ticket... beneficiaries who are most likely to return to work. We will send a Ticket to any eligible disabled beneficiary...
78 FR 28953 - William D. Ford Federal Direct Loan Program
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-16
... students since July 1, 2011. Second, the law placed a limit on Direct Subsidized Loan eligibility for new... students to complete their academic programs in a timely manner. Timely completion of programs will allow... student loan debt. This interim final rule implements the required statutory changes. Summary of the Major...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-27
... SNDA was conducted. Larger proportions of elementary schools met the standards for total fat and... Certification of Compliance With Meal Requirements for the National School Lunch Program Under the Healthy.... SUMMARY: This interim rule amends National School Lunch Program regulations to conform to requirements...
ERIC Educational Resources Information Center
Jung, Steven M.; And Others
Survey activities are reported which were designed to provide the foundation for a national evaluation of the effectiveness of programs assisted under the Career Education Incentive Act of 1977 (PL 95-207). The methodology described, called "program evaluability assessment," focuses on detailed analysis of program assumptions in order to…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-16
... System Supervision (PWSS) programs to meet the requirements of the Safe Drinking Water Act (SDWA). The State of Rhode Island has adopted drinking water regulations for the Arsenic Rule (66 FR 6976... adopted drinking water regulations for the Interim Enhanced Surface Water Treatment Rule (63 FR 69477...
76 FR 68116 - Structure and Practices of the Video Relay Service Program
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-03
... Practices of the Video Relay Service Program AGENCY: Federal Communications Commission. ACTION: Interim rule... with the Commission's Structure and Practices of the Video Relay Service Program, Second Report and... announcement of the effective date of the rules. See, In the Matter of Structure and Practices of the Video...
10 CFR 712.19 - Removal from HRP.
Code of Federal Regulations, 2010 CFR
2010-01-01
... OF ENERGY HUMAN RELIABILITY PROGRAM Establishment of and Procedures for the Human Reliability Program... immediately remove that individual from HRP duties pending a determination of the individual's reliability. A... HRP duties pending a determination of the individual's reliability is an interim, precautionary action...
IVHS Countermeasures For Rear-End Collisions, Task 1 Volume I: Summary, Interim Report
DOT National Transportation Integrated Search
1994-02-01
THE ATTACHED REPORT IS FROM THE NHTSA SPONSORED PROGRAM, "IVHS COUNTERMEASURES FOR REAR-END COLLISIONS," CONTRACT #DTNH22-93-C-07326. THE PROGRAM'S PRIMARY OBJECTIVE IS TO DEVELOP PRACTICAL PERFORMANCE GUIDELINES OR SPECIFICATIONS FOR REAR-END COLLIS...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-17
...] Competitive and Noncompetitive Nonformula Federal Assistance Programs--Administrative Provisions for Biomass..., without change, an interim rule containing a set of specific administrative requirements for the Biomass... Biomass Research and Development Initiative (BRDI) under which competitively awarded grants, contracts...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mays, S.E.; Poloski, J.P.; Sullivan, W.H.
1982-07-01
This report describes a risk study of the Browns Ferry, Unit 1, nuclear plant. The study is one of four such studies sponsored by the NRC Office of Research, Division of Risk Assessment, as part of its Interim Reliability Evaluation Program (IREP), Phase II. This report is contained in four volumes: a main report and three appendixes. Appendix B provides a description of Browns Ferry, Unit 1, plant systems and the failure evaluation of those systems as they apply to accidents at Browns Ferry. Information is presented concerning front-line system fault analysis; support system fault analysis; human error models andmore » probabilities; and generic control circuit analyses.« less
77 FR 52614 - Pre-Existing Condition Insurance Plan Program
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-30
...This document contains an amendment regarding program eligibility to the interim final regulation implementing the Pre- Existing Condition Plan program under provisions of the Patient Protection and Affordable Care Act. In light of a new process recently announced by the Department of Homeland Security, eligibility for the program is being amended so that the program does not inadvertently expand the scope of that process.
Fit of interim crowns fabricated using photopolymer-jetting 3D printing.
Mai, Hang-Nga; Lee, Kyu-Bok; Lee, Du-Hyeong
2017-08-01
The fit of interim crowns fabricated using 3-dimensional (3D) printing is unknown. The purpose of this in vitro study was to evaluate the fit of interim crowns fabricated using photopolymer-jetting 3D printing and to compare it with that of milling and compression molding methods. Twelve study models were fabricated by making an impression of a metal master model of the mandibular first molar. On each study model, interim crowns (N=36) were fabricated using compression molding (molding group, n=12), milling (milling group, n=12), and 3D polymer-jetting methods. The crowns were prepared as follows: molding group, overimpression technique; milling group, a 5-axis dental milling machine; and polymer-jetting group using a 3D printer. The fit of interim crowns was evaluated in the proximal, marginal, internal axial, and internal occlusal regions by using the image-superimposition and silicone-replica techniques. The Mann-Whitney U test and Kruskal-Wallis tests were used to compare the results among groups (α=.05). Compared with the molding group, the milling and polymer-jetting groups showed more accurate results in the proximal and marginal regions (P<.001). In the axial regions, even though the mean discrepancy was smallest in the molding group, the data showed large deviations. In the occlusal region, the polymer-jetting group was the most accurate, and compared with the other groups, the milling group showed larger internal discrepancies (P<.001). Polymer-jet 3D printing significantly enhanced the fit of interim crowns, particularly in the occlusal region. Copyright © 2016 Editorial Council for the Journal of Prosthetic Dentistry. Published by Elsevier Inc. All rights reserved.
Pilot-scale treatability test plan for the 200-BP-5 operable unit
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This document presents the treatability test plan for pilot-scale pump and treat testing at the 200-BP-5 Operable Unit. This treatability test plan has been prepared in response to an agreement between the U.S. Department of Energy (DOE), the U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology), as documented in Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1989a) Change Control Form M-13-93-03 (Ecology et al. 1994) and a recent 200 NPL Agreement Change Control Form (Appendix A). The agreement also requires that, following completion of the activities described in thismore » test plan, a 200-BP-5 Operable Unit Interim Remedial Measure (IRM) Proposed Plan be developed for use in preparing an Interim Action Record of Decision (ROD). The IRM Proposed Plan will be supported by the results of this treatability test plan, as well as by other 200-BP-5 Operable Unit activities (e.g., development of a qualitative risk assessment). Once issued, the Interim Action ROD will specify the interim action(s) for groundwater contamination at the 200-BP-5 Operable Unit. The treatability test approach is to conduct a pilot-scale pump and treat test for each of the two contaminant plumes associated with the 200-BP-5 Operable Unit. Primary contaminants of concern are {sup 99}Tc and {sup 60}Co for underwater affected by past discharges to the 216-BY Cribs, and {sup 90}Sr, {sup 239/240}Pu, and Cs for groundwater affected by past discharges to the 216-B-5 Reverse Well. The purpose of the pilot-scale treatability testing presented in this testplan is to provide the data basis for preparing an IRM Proposed Plan. To achieve this objective, treatability testing must: Assess the performance of groundwater pumping with respect to the ability to extract a significant amount of the primary contaminant mass present in the two contaminant plumes.« less
Evaluation Design 1978-1979: ESAA Title I Migrant Program. Publication Number 78.11.
ERIC Educational Resources Information Center
Friedman, Myron; And Others
To collect and disseminate information relevant to the accountability and program components of the Title I Migrant Program in the Austin school district and to report to the Texas Education Agency through interim and final reports on how well the migrant program is meeting its stated objectives for 1978-79 are the functions of the evaluation for…
ERIC Educational Resources Information Center
Zhang, Yu; Chan, Tsze
2007-01-01
This report describes essential characteristics and key program outcome measures for the Student Support Services (SSS) program grantees and participants in reporting years 2002-03 and 2003-04. The SSS program is designed to increase college persistence and graduation rates for eligible students, increase the transfer rates of eligible students…
ERIC Educational Resources Information Center
Hale, Margaret Marcus; Chan, Tsze
2006-01-01
Created in 1972, the Educational Opportunity Centers (EOC) Program, one of eight TRIO Programs, funds EOC projects at two- and four-year colleges and universities and public or private agencies or organizations to assist adults from disadvantaged backgrounds to enter or continue a postsecondary education program. Participants in EOC projects…
75 FR 30113 - Rural Microentrepreneur Assistance Program
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-28
... government levels. Regulatory Flexibility Act This interim rule has been reviewed with regard to the... efforts to build the capacity of the microenterprise development industry to achieve new levels of... loan program level and legislative intent in the USDA FY 2010 appropriations bill. If this information...
75 FR 6839 - Technical Service Provider Assistance
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-12
... Executive Order 12866, the Office of Management and Budget determined that this final rule is not a... or are eligible to participate in conservation programs to help them make land management decisions...: Covered Programs. The interim final rule incorporated reference to the Agricultural Management Assistance...
Petrotac bridge deck waterproofing membrane on Five Mile Creek Bridge : first interim report.
DOT National Transportation Integrated Search
1986-09-01
During the 1970's, the Oregon State Highway Division was involved in a Federally funded experimental program to evaluate various waterproofing membrane systems for bridge decks. Through this program, a list of approved products and/or systems was dev...
DOT National Transportation Integrated Search
1994-02-01
THE ATTACHED REPORT IS FROM THE NHTSA SPONSORED PROGRAM, "IVHS COUNTERMEASURES FOR REAR-END COLLISIONS," CONTRACT #DTNH22-93-C-07326. THE PROGRAM'S PRIMARY OBJECTIVE IS TO DEVELOP PRACTICAL PERFORMANCE GUIDELINES OR SPECIFICATIONS FOR REAR-END COLLIS...
76 FR 70639 - Agricultural Career and Employment Grants Program; Correction
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-15
... DEPARTMENT OF AGRICULTURE Office of Advocacy and Outreach 7 CFR Part 2502 RIN 0503-AA49 Agricultural Career and Employment Grants Program; Correction AGENCY: Office of Advocacy and Outreach, Departmental Management, USDA. ACTION: Interim rule with request for comments; correction. SUMMARY: On November...
An evaluation of the short-term effects of the Virginia driver improvement program : interim report.
DOT National Transportation Integrated Search
1981-01-01
This study attempted to determine the impact of the driver improvement program on Virginia's traffic and safety environment in terms of accidents and traffic convictions averted as a result of appropriate treatment, and to establish an ongoing system...
This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.
Purpura, Lawrence J; Soka, Moses; Baller, April; White, Stephen; Rogers, Emerson; Choi, Mary J; Mahmoud, Nuha; Wasunna, Christine; Massaquoi, Moses; Vanderende, Kristin; Kollie, Jomah; Dweh, Straker; Bemah, Philip; Christie, Athalia; Ladele, Victor; Subah, Onyekachi; Pillai, Satish; Mugisha, Margaret; Kpaka, Jonathan; Nichol, Stuart; Ströher, Ute; Abad, Neetu; Mettee-Zarecki, Shauna; Bailey, Jeff A; Rollin, Pierre; Marston, Barbara; Nyenswah, Tolbert; Gasasira, Alex; Knust, Barbara; Williams, Desmond
2016-09-16
According to World Health Organization (WHO) data, the Ebola virus disease (Ebola) outbreak that began in West Africa in 2014 has resulted in 28,603 cases and 11,301 deaths (1). In March 2015, epidemiologic investigation and genetic sequencing in Liberia implicated sexual transmission from a male Ebola survivor, with Ebola virus detected by reverse transcription-polymerase chain reaction (RT-PCR) 199 days after symptom onset (2,3), far exceeding the 101 days reported from an earlier Ebola outbreak (4). In response, WHO released interim guidelines recommending that all male survivors, in addition to receiving condoms and sexual risk reduction counseling at discharge from an Ebola treatment unit (ETU), be offered semen testing for Ebola virus RNA by RT-PCR 3 months after disease onset, and every month thereafter until two consecutive semen specimens collected at least 1 week apart test negative for Ebola virus RNA (5). Male Ebola survivors should also receive counseling to promote safe sexual practices until their semen twice tests negative. When these recommendations were released, testing of semen was not widely available in Liberia. Challenges in establishing and operating the first nationwide semen testing and counseling program for male Ebola survivors included securing sufficient resources for the program, managing a public health semen testing program in the context of ongoing research studies that were also collecting and screening semen, identification of adequate numbers of trained counselors and appropriate health communication messages for the program, overcoming Ebola survivor-associated stigma, identification and recruitment of male Ebola survivors, and operation of mobile teams.
Comparison of measured and calculated dynamic loads for the Mod-2 2.5 mW wind turbine system
NASA Technical Reports Server (NTRS)
Zimmerman, D. K.; Shipley, S. A.; Miller, R. D.
1995-01-01
The Boeing Company, under contract to the Electric Power Research Institute (EPRI), has completed a test program on the Mod-2 wind turbines at Goodnoe Hills, Washington. The objectives were to update fatigue load spectra, discern site and machine differences, measure vortex generator effects, and to evaluate rotational sampling techniques. This paper shows the test setup and loads instrumentation, loads data comparisons and test/analysis correlations. Test data are correlated with DYLOSAT predictions using both the NASA interim turbulence model and rotationally sampled winds as inputs. The latter is demonstrated to have the potential to improve the test/analysis correlations. The paper concludes with an assessment of the importance of vortex generators, site dependence, and machine differences on fatigue loads. The adequacy of prediction techniques used are evaluated and recommendations are made for improvements to the methodology.
ERIC Educational Resources Information Center
Forest, Jan
The Integrated Occupational Program (IOP) was designed for students in grades 8-12 who have experienced prolonged difficulty with the regular elementary and secondary school programs, who demonstrate a significant lag in one or more of their academic courses, and who typically fall into the intelligence band of 75-95 IQ. The IOP enables students…
Work Experience Program Teacher Resource Manual. Junior and Senior High School. Interim Edition.
ERIC Educational Resources Information Center
Gullekson, Dale
This manual has been prepared to help educators in Alberta, Canada, organize and operate a work experience program that provides meaningful learning experiences for junior and senior high school students in partnership with the community. The manual: (1) outlines the expectations of the work experience program, including benefits to students,…
Harvard University Program on Technology and Society 1964-1972. A Final Review.
ERIC Educational Resources Information Center
Harvard Univ., Cambridge, MA. Program on Technology and Society.
Eight years of research by the Harvard University's Program on Technology and Society are summarized. Lengthy abstracts of the 29 books and 164 articles that resulted from the Program, as well as interim accounts of projects not yet completed are presented. The report is divided into four parts; institutions (including business, education, and…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-09-01
This document describes the environmental monitoring program at the Maywood Interim Storage Site (MISS) and surrounding area, implementation of the program, and monitoring results for 1991. Environmental monitoring of MISS began in 1984 when congress added the site to the US Department of Energy`s (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP is a DOE program to identify and decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation`s atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The environmental monitoring program at MISS includesmore » sampling networks for radon and thoron concentrations in air; external gamma radiation-exposure; and total uranium, radium-226, radium-228, thorium-232, and thorium-230 concentrations in surface water, sediment, and groundwater. Additionally, several nonradiological parameters are measured in surface water, sediment, and groundwater. Monitoring results are compared with applicable Environmental Protection Agency standards, DOE derived concentration guides (DCGs), dose limits, and other requirements in DOE orders. Environmental standards are established to protect public health and the environment.« less
2013-10-03
: In the fiscal year (FY) 2014 inpatient prospective payment systems (IPPS)/long-term care hospital (LTCH) PPS final rule, we established the methodology for determining the amount of uncompensated care payments made to hospitals eligible for the disproportionate share hospital (DSH) payment adjustment in FY 2014 and a process for making interim and final payments. This interim final rule with comment period revises certain operational considerations for hospitals with Medicare cost reporting periods that span more than one Federal fiscal year and also makes changes to the data that will be used in the uncompensated care payment calculation in order to ensure that data from Indian Health Service (IHS) hospitals are included in Factor 1 and Factor 3 of that calculation.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-31
... DEPARTMENT OF AGRICULTURE Food and Nutrition Service 7 CFR Parts 271 and 274 RIN 0584-AE26 Supplemental Nutrition Assistance Program: Trafficking Controls and Fraud Investigations AGENCY: Food and Nutrition Service, USDA. ACTION: Final rule, Interim final rule; notice of approval of Information...
DOT National Transportation Integrated Search
1994-02-01
THE ATTACHED REPORT IS FROM THE NHTSA SPONSORED PROGRAM, "IVHS COUNTERMEASURES FOR REAR-END COLLISIONS," CONTRACT #DTNH22-93-C-07326. THE PROGRAM'S PRIMARY OBJECTIVE IS TO DEVELOP PRACTICAL PERFORMANCE GUIDELINES OR SPECIFICATIONS FOR REAR-END COLLIS...
The atmospheric effects of stratospheric aircraft: A fourth program report
NASA Technical Reports Server (NTRS)
Stolarski, Richard S. (Editor); Wesoky, Howard L. (Editor); Wofsy, Steven C.; Ravishankara, A. R.; Rodriguez, Jose M.; Grose, William L.
1995-01-01
This document presents the fourth report from the Atmospheric Effects of Stratospheric Aircraft (AESA) component of NASA's High-Speed Research Program (HSRP). Market and technology considerations continue to provide an impetus for high-speed civil transport research. A recent AESA interim assessment report and a review of that report have shown that considerable uncertainty still exists about the possible impact of aircraft on the atmosphere. The AESA has been designed to develop the body of scientific knowledge necessary for the evaluation of the impact of stratospheric aircraft on the atmosphere. The first Program report presented the basic objectives and plans for AESA. This fourth report comes after the interim assessment and sets forth directions for the 1995 assessment at the end of AESA Phase 1. It also sets forth the goals and directions for AESA Phase 2, as reported at the 1994 Atmospheric Effects of Aviation Project (AEAP) annual meeting held in June. The focus of the Phase 2 effort is to obtain the best possible closure on the outstanding problems identified in the interim assessment and NASA/NRC review. Topics discussed in this report include how high-speed civil transports (HSCT) might affect stratospheric ozone, emissions scenarios and databases to assess potential atmospheric effects from HSCT's, calculated results from 2-D zonal mean models using emissions data, engine trace constituent measurements.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dunn, K.; Bellamy, S.; Daugherty, W.
Nuclear material inventories are increasingly being transferred to interim storage locations where they may reside for extended periods of time. Use of a shipping package to store nuclear materials after the transfer has become more common for a variety of reasons. Shipping packages are robust and have a qualified pedigree for performance in normal operation and accident conditions but are only certified over an approved transportation window. The continued use of shipping packages to contain nuclear material during interim storage will result in reduced overall costs and reduced exposure to workers. However, the shipping package materials of construction must maintainmore » integrity as specified by the safety basis of the storage facility throughout the storage period, which is typically well beyond the certified transportation window. In many ways, the certification processes required for interim storage of nuclear materials in shipping packages is similar to life extension programs required for dry cask storage systems for commercial nuclear fuels. The storage of spent nuclear fuel in dry cask storage systems is federally-regulated, and over 1500 individual dry casks have been in successful service up to 20 years in the US. The uncertainty in final disposition will likely require extended storage of this fuel well beyond initial license periods and perhaps multiple re-licenses may be needed. Thus, both the shipping packages and the dry cask storage systems require materials integrity assessments and assurance of continued satisfactory materials performance over times not considered in the original evaluation processes. Test programs for the shipping packages have been established to obtain aging data on materials of construction to demonstrate continued system integrity. The collective data may be coupled with similar data for the dry cask storage systems and used to support extending the service life of shipping packages in both transportation and storage.« less
76 FR 41411 - West Virginia Regulatory Program
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-14
... of Environmental Protection (WVDEP). The interim rule provided an opportunity for public comment and... 30 CFR Part 948 Intergovernmental relations, Surface mining, Underground mining. Dated: July 5, 2011...
Interim Report on the Truancy Court Diversion Program in the District of Columbia, 2011-12
ERIC Educational Resources Information Center
Cahill, Meagan; Liberman, Akiva; Cramer, Lindsey
2012-01-01
The Truancy Court Diversion Program (TCDP) is a voluntary program for at risk students and their parents. It combines involvement of a Family Court judge in group and individual sessions with service provision. During the 2011-12 school year, a pilot TCDP was implemented at Kramer Middle School (M.S.) and at Johnson M.S. The program attempts to…
ERIC Educational Resources Information Center
Searcy, Ellen Ouhl
The main objectives of this report about the Federal effort in early learning research are to assist the National Program on Early Childhood Education (NPECE) in planning its research and development program, to identify predicted "popular" areas of research for the future, and to identify possible NPECE funding sources. The report…
ERIC Educational Resources Information Center
Reed, Deborah K.
2015-01-01
This study explored the data-based decision making of 12 teachers in grades 6-8 who were asked about their perceptions and use of three required interim measures of reading performance: oral reading fluency (ORF), retell, and a benchmark comprised of released state test items. Focus group participants reported they did not believe the benchmark or…
ERIC Educational Resources Information Center
Markey, Karen; Demeyer, Anh N.
This research project focuses on the implementation and testing of the Dewey Decimal Classification (DDC) system as an online searcher's tool for subject access, browsing, and display in an online catalog. The research project comprises 12 activities. The three interim reports in this document cover the first seven of these activities: (1) obtain…
Describes the overall scope of the AEATF II program, demonstrates the need for additional human exposure monitoring data and explains the proposed methodology for the exposure monitoring studies proposed for conduct by the AEATF II.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-02
... National School Lunch Program: School Food Service Account Revenue Amendments Related to the Healthy, Hunger-Free Kids Act of 2010; Approval of Information Collection Request AGENCY: Food and Nutrition Service, USDA. ACTION: Interim final rule; approval of information collection request. SUMMARY: The Food...
Satellite Academies Program: Interim Report.
ERIC Educational Resources Information Center
Center for Urban Education, New York, NY.
The Satellite Academies Program (SAP) is considered to have the following central goals: (1) to improve basic academic skills, (2) to provide meaningful work experience, (3) to develop a job-related educational curriculum, (4) to involve the business community in education, (5) to increase student involvement in the educational process, and (6) to…
Second Interim Report of the Broadly-Based Community Study of Exceptional Education.
ERIC Educational Resources Information Center
Milwaukee Public Schools, WI. Div. of Curriculum and Instruction.
Presented are recommendations of a Milwaukee public school study for the purpose of providing a meaningful, effective, and comprehensive educational program for exceptional students. Fourteen recommendations covering the broad policy of exceptional education include policies on integration into normal school programs, transportation, and early…
78 FR 26504 - Women-Owned Small Business Federal Contract Program
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-07
... SMALL BUSINESS ADMINISTRATION 13 CFR Part 127 RIN 3245-AG55 Women-Owned Small Business Federal Contract Program AGENCY: U.S. Small Business Administration. ACTION: Interim final rule. SUMMARY: The U.S. Small Business Administration (SBA) is amending its regulations to implement Section 1697 of the...
40 CFR 52.241 - Interim approval of enhanced inspection and maintenance program.
Code of Federal Regulations, 2010 CFR
2010-07-01
... AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California... Act (Pub. L. 104-59), the California SIP is approved as meeting the provisions of section 182(c)(3.... (a) [Reserved] (b) Approval. On June 5, 2009, the California Air Resources Board submitted a revision...
ERIC Educational Resources Information Center
Administration for Children, Youth, and Families (DHHS), Washington, DC. Head Start Bureau.
The Comprehensive Child Development Program (CCDP), enacted by Congress in 1988, provides intensive, comprehensive, integrated, and continuous support to preschool children from low-income families to enhance their intellectual, social, and physical development. It also provides needed services to parents and household family members to enhance…
Putting Data to Work: Interim Recommendations from The Benchmarking Project
ERIC Educational Resources Information Center
Miles, Marty; Maguire, Sheila; Woodruff-Bolte, Stacy; Clymer, Carol
2010-01-01
As public and private funders have focused on evaluating the effectiveness of workforce development programs, a myriad of data collection systems and reporting processes have taken shape. Navigating these systems takes significant time and energy and often saps frontline providers' capacity to use data internally for program improvement.…
The Development of a Vocational Diagnostic Program. Interim Report.
ERIC Educational Resources Information Center
Barnard, William W.
A five-phased project is described which was designed to develop more specific diagnostic procedures and instrumentation that would allow both the vocational counselor and the prospective student to determine more effectively specific occupational programs and occupational objectives for education at the postsecondary level. Phases of the project…
34 CFR 668.58 - Interim disbursements.
Code of Federal Regulations, 2013 CFR
2013-07-01
... in accordance with § 668.59(a), the institution may not— (i) Disburse any Federal Pell Grant, FSEOG... the applicant in its FWS Program; or (iii) Originate a Direct Subsidized Loan, or disburse any such..., under the FWS Program for the first 60 consecutive days after the student's enrollment in that award...
34 CFR 668.58 - Interim disbursements.
Code of Federal Regulations, 2012 CFR
2012-07-01
... in accordance with § 668.59(a), the institution may not— (i) Disburse any Federal Pell Grant, FSEOG... the applicant in its FWS Program; or (iii) Originate a Direct Subsidized Loan, or disburse any such..., under the FWS Program for the first 60 consecutive days after the student's enrollment in that award...
34 CFR 668.58 - Interim disbursements.
Code of Federal Regulations, 2014 CFR
2014-07-01
... in accordance with § 668.59(a), the institution may not— (i) Disburse any Federal Pell Grant, FSEOG... the applicant in its FWS Program; or (iii) Originate a Direct Subsidized Loan, or disburse any such..., under the FWS Program for the first 60 consecutive days after the student's enrollment in that award...
77 FR 33662 - Structure and Practices of the Video Relay Service Program
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-07
... FEDERAL COMMUNICATIONS COMMISSION 47 CFR Part 64 [CG Docket No. 10-51; FCC 11-118] Structure and Practices of the Video Relay Service Program AGENCY: Federal Communications Commission. ACTION: Correcting amendments. SUMMARY: This document contains a correction to the interim regulations of the Commission's rules...
ERIC Educational Resources Information Center
US Department of Education, 2004
2004-01-01
The Title II Higher Education Amendment (HEA) Partnership Grants Program provides grants to fund partnerships among colleges of education, schools of arts and sciences and local school districts in high-need areas. The goal of the program is to improve student achievement by increasing the quality of teachers. This evaluation examined the extent…
Interim user's manual for boundary layer integral matrix procedure, version J
NASA Technical Reports Server (NTRS)
Evans, R. M.; Morse, H. L.
1974-01-01
A computer program for analyzing two dimensional and axisymmetric nozzle performance with a variety of wall boundary conditions is described. The program has been developed for application to rocket nozzle problems. Several aids to usage of the program and two auxiliary subroutines are provided. Some features of the output are described and three sample cases are included.
ERIC Educational Resources Information Center
Weigel, Corina; Kokocinski, Kathrin; Lederer, Peter; Dotsch, Jorg; Rascher, Wolfgang; Knerr, Ina
2008-01-01
Objective: The authors performed a group-based program for obese children and adolescents in Bavaria, Germany to enable them to establish a health-oriented lifestyle and to reduce overweight. The authors compared this program with a control approach based on the patients' own initiative. Design: This is a controlled clinical trial. Setting: A…
National Program Plan for Research and Development in Solar Heating and Cooling. Interim Report.
ERIC Educational Resources Information Center
Energy Research and Development Administration, Washington, DC. Div. of Solar Energy.
This report presents the Energy Research and Development Administration (ERDA) program plan for solar heating and cooling of buildings and for agricultural and industrial process applications. An overview of the program plan is followed by a description of the ten paths to the solar heating and cooling of buildings and a brief discussion of the…
ERIC Educational Resources Information Center
Larson, Milton E.
This guide is designed for use by any person or groups of persons responsible for planning occupational programs in the machine trades. Its major purpose is to elicit the necessary information for the writing of educational specifications for facilities to house needed vocational programs in machine tool operation, machine shop, and tool and die…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-09-01
This document describes the environmental monitoring program at the Hazelwood Interim Storage Site (HISS) and surrounding area, implementation of the program, and monitoring results for 1991. Environmental monitoring of HISS began in 1984 when the site was assigned to the US Department of Energy (DOE) as part of the decontamination research and development project authorized by Congress under the 1984 Energy and Water Development Appropriations Act. DOE placed responsibility for HISS under the Formerly Utilized Sites Remedial Action Program (FUSRAP), a DOE program to decontaminate or otherwise control sites where residual radioactive materials remain from the early years of themore » nation`s atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The environmental monitoring program at HISS includes sampling networks for radon concentrations in air; external gamma radiation exposure; and radium-226, thorium-230, and total uranium concentrations in surface water, sediment, and groundwater. Additionally, several nonradiological parameters are measured in groundwater. Monitoring results are compared with applicable Environmental Protection Agency standards, DOE derived concentration guides (DCGs), dose limits, and other requirements in DOE orders. Environmental standards and DCGs are established to protect public health and the environment.« less
24 CFR 884.109 - Rent adjustments.
Code of Federal Regulations, 2010 CFR
2010-04-01
... SUPPORTIVE HOUSING FOR THE ELDERLY PROGRAM AND SECTION 811 SUPPORTIVE HOUSING FOR PERSONS WITH DISABILITIES... will be determined by HUD at least annually; interim revisions may be made as market conditions warrant...
2009-02-27
This notice announces the continuation of effectiveness of a Medicare interim final rule with comment period and the extension of the timeline for publication of the final rule. This notice is issued in accordance with section 1871(a)(3)(C) of the Social Security Act (the Act), which allows an interim final rule to remain in effect after the expiration of the timeline specified in section 1871(a)(3)(B) of the Act (the "regular timeline") or, if applicable, at the end of each succeeding 1-year extension to the regular timeline, if prior to the expiration of the timeline, the Secretary publishes in the Federal Register a notice of continuation and explains why the regular timeline or any subsequent extension was not complied with.
2010-01-13
The Department of Health and Human Services (HHS) is issuing this interim final rule with a request for comments to adopt an initial set of standards, implementation specifications, and certification criteria, as required by section 3004(b)(1) of the Public Health Service Act. This interim final rule represents the first step in an incremental approach to adopting standards, implementation specifications, and certification criteria to enhance the interoperability, functionality, utility, and security of health information technology and to support its meaningful use. The certification criteria adopted in this initial set establish the capabilities and related standards that certified electronic health record (EHR) technology will need to include in order to, at a minimum, support the achievement of the proposed meaningful use Stage 1 (beginning in 2011) by eligible professionals and eligible hospitals under the Medicare and Medicaid EHR Incentive Programs.
Schwartz, Robert P.; Kelly, Sharon M.; Mitchell, Shannon G.; Dunlap, Laura; Zarkin, Gary A.; Sharma, Anjalee; O’Grady, Kevin E.; Jaffe, Jerome H.
2016-01-01
Background Methadone maintenance is an effective treatment for opioid dependence but is rarely initiated in US jails. Patient navigation is a promising approach to improve continuity of care but has not been tested in bridging the gap between jail- and community-based drug treatment programs. Methods This is an open-label randomized clinical trial among 300 adult opioid dependent newly-arrested detainees that will compare three treatment conditions: methadone maintenance without routine counseling (termed Interim Methadone; IM) initiated in jail v. IM and patient navigation v. enhanced treatment-as-usual. The two primary outcomes will be: (1) the rate of entry into treatment for opioid use disorder within 30 days from release and (2) frequency of opioid positive urine tests over the 12-month follow-up period. An economic analysis will examine the costs, cost-effectiveness, and cost-benefit ratio of the study interventions. Results We describe the background and rationale for the study, its aims, hypotheses, and study design. Conclusions Given the large number of opioid dependent detainees in the US and elsewhere, initiating IM at the time of incarceration could be a significant public health and clinical approach to reducing relapse, recidivism, HIV-risk behavior, and criminal behavior. An economic analysis will be conducted to assist policy makers in determining the utility of adopting this approach. PMID:27282117
Schwartz, Robert P; Kelly, Sharon M; Mitchell, Shannon G; Dunlap, Laura; Zarkin, Gary A; Sharma, Anjalee; O'Grady, Kevin E; Jaffe, Jerome H
2016-07-01
Methadone maintenance is an effective treatment for opioid dependence but is rarely initiated in US jails. Patient navigation is a promising approach to improve continuity of care but has not been tested in bridging the gap between jail- and community-based drug treatment programs. This is an open-label randomized clinical trial among 300 adult opioid dependent newly-arrested detainees that will compare three treatment conditions: methadone maintenance without routine counseling (termed Interim Methadone; IM) initiated in jail v. IM and patient navigation v. enhanced treatment-as-usual. The two primary outcomes will be: (1) the rate of entry into treatment for opioid use disorder within 30days from release and (2) frequency of opioid positive urine tests over the 12-month follow-up period. An economic analysis will examine the costs, cost-effectiveness, and cost-benefit ratio of the study interventions. We describe the background and rationale for the study, its aims, hypotheses, and study design. Given the large number of opioid dependent detainees in the US and elsewhere, initiating IM at the time of incarceration could be a significant public health and clinical approach to reducing relapse, recidivism, HIV-risk behavior, and criminal behavior. An economic analysis will be conducted to assist policy makers in determining the utility of adopting this approach. ClinicalTrials.gov: NCT02334215. Copyright © 2016 Elsevier Inc. All rights reserved.
On condition evaluation of axle unit bearings of wheel pair
NASA Astrophysics Data System (ADS)
Glotov, V. V.; Romashchenko, M. A.; Ostroumov, I. V.; Kondratiev, Il V.
2018-03-01
At present, axle units of freight cars undergo a complete checkup with disassembling and visual inspection of the bearing parts every five years. During an annual interim checkup, external inspection of an axle box with removed cap is carried out and the lubricant condition is checked. The state of the rolling surfaces of bearings during an interim checkup should be assessed using the known methods of nondestructive testing.
Space station thermal control surfaces. Volume 1: Interim report
NASA Technical Reports Server (NTRS)
Maag, C. R.; Millard, J. M.
1978-01-01
The U.S. space program goals for long-duration manned missions place particular demands on thermal-control systems. The objective of this program is to develop plans which are based on the present thermal-control technology, and which will keep pace with the other space program elements. The program tasks are as follows: (1) requirements analysis, with the objectives to define the thermal-control-surface requirements for both space station and 25 kW power module, to analyze the missions, and to determine the thermal-control-surface technology needed to satisfy both sets of requirements; (2) technology assessment, with the objectives to perform a literature/industry survey on thermal-control surfaces, to compare current technology with the requirements developed in the first task, and to determine what technology advancements are required for both the space station and the 25 kW power module; and (3) program planning that defines new initiative and/or program augmentation for development and testing areas required to provide the proper environment control for the space station and the 25 kW power module.
Mourning dove hunting regulation strategy based on annual harvest statistics and banding data
Otis, D.L.
2006-01-01
Although managers should strive to base game bird harvest management strategies on mechanistic population models, monitoring programs required to build and continuously update these models may not be in place. Alternatively, If estimates of total harvest and harvest rates are available, then population estimates derived from these harvest data can serve as the basis for making hunting regulation decisions based on population growth rates derived from these estimates. I present a statistically rigorous approach for regulation decision-making using a hypothesis-testing framework and an assumed framework of 3 hunting regulation alternatives. I illustrate and evaluate the technique with historical data on the mid-continent mallard (Anas platyrhynchos) population. I evaluate the statistical properties of the hypothesis-testing framework using the best available data on mourning doves (Zenaida macroura). I use these results to discuss practical implementation of the technique as an interim harvest strategy for mourning doves until reliable mechanistic population models and associated monitoring programs are developed.
Thompson, Geoffrey A; Luo, Qing
2014-09-01
Because polymer-based interim restorative materials are weak, even well-made restorations sometimes fail before the definitive restoration is ready for insertion. Therefore, knowing which fabrication procedures and service conditions affect mechanical properties is important, particularly over an extended period. The purpose of this study was to evaluate the effect of thermal treatment, surface sealing, thermocycling, storage media, storage temperature, and age on autopolymerizing poly(methylmethacrylate) and bis-acryl interim restorative materials. Outcome measures were flexural strength, Vickers surface microhardness, and impact strength. Flexural strength and microhardness of poly(methylmethacrylate) (Jet Acrylic) and 2 bis-acryl-composite resin (Protemp 3 Garant and Integrity) interim restorative materials were evaluated as affected by storage media, storage temperature, storage time, thermocycling, postpolymerization thermal treatment, or application of a surface sealer. In total, 2880 beam specimens (25×2×2 mm) were fabricated. Mechanical property analyses were made at 10 days, 30 days, 6 months, and 1 year after specimen preparation. Flexural strength was determined by using a 3-point bending test in a universal testing machine with a 1 kN load cell at a crosshead speed of 5.0 mm min(-1). Fracture specimens were recovered and used for determining Vickers microhardness. Measurements were made with a 0.1 N load and 15 second dwell time. Three microhardness measurements were made for each specimen, and the mean was used for reporting Vickers microhardness. Notched impact specimens (64×12.7×6.35 mm) were fabricated from Jet, Protemp 3 Garant, and Integrity interim restorative materials, yielding 288 impact specimens. Impact strengths were assessed at 10 days, 30 days, 6 months, and 1 year with a 2 J pendulum. The effects of the various experimental treatments were determined and rank ordered with analysis of variance, F ratios, and least square means differences Student t tests (α=.05). All experimental treatments investigated had significant effects on flexural strength, with material (P<.001) and thermocycling (P<.001) being dominant. Moreover, all experimental treatments investigated had a significant overall impact on Vickers microhardness with material (P<.001) and Palaseal glaze (P<.001) showing large effects. Material (P<.001) and age (P=.010) had a significant effect on impact strength. Mechanical properties of some interim polymeric materials can be improved by postpolymerization heat treatments or surface glazing. This procedure may extend the useful lifetime of some bis-acryl interim restorations. Copyright © 2014 Editorial Council for the Journal of Prosthetic Dentistry. Published by Elsevier Inc. All rights reserved.
76 FR 63151 - Small Business Jobs Act: 504 Loan Program Debt Refinancing
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-12
... SMALL BUSINESS ADMINISTRATION 13 CFR Part 120 RIN 3245-AG17 Small Business Jobs Act: 504 Loan Program Debt Refinancing AGENCY: U.S. Small Business Administration. ACTION: Final rule. SUMMARY: This rule finalizes the interim final rule that implemented section 1122 of the Small Business Jobs Act of...
Project PRIME. Interim Report Year One 1971-1972 (Purpose and Procedures).
ERIC Educational Resources Information Center
Kaufman, Martin J.; And Others
Project PRIME (Programmed Re-Entry Into Mainstream Education) is concerned with evaluating the effectiveness of programs that aim at integration of handicapped children into regular classrooms. The main goals of the project are to determine which handicapped children can benefit from integration and under which conditions would it prove the most…
This document describes the overall scope of the AEATF II program, demonstrates the need for additional human exposure monitoring data and explains the proposed methodology for the exposure monitoring studies proposed for conduct by the AEATF II.
ERIC Educational Resources Information Center
Greenberg, David; Verma, Nandita; Dillman, Keri-Nicole; Chaskin, Robert
2010-01-01
Distressed urban neighborhoods face challenges on multiple fronts, but most efforts to confront these problems work in isolation of one another. The New Communities Program (NCP) is an exception, helping selected Chicago neighborhoods develop partnerships to address challenges involving employment, education, housing, and safety in a…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-02
...] RIN 1018-AX45 Fisheries and Habitat Conservation and Migratory Birds Programs; Draft Land-Based Wind... Register on February 18, 2011, announcing the availability for public comment of draft Land-Based Wind... Guidelines are intended to supersede the Service's 2003 voluntary, interim guidelines for land-based wind...
Upward Bound Math-Science: Program Description and Interim Impact Estimates
ERIC Educational Resources Information Center
Olsen, Robert; Seftor, Neil; Silva, Tim; Myers, David; DesRoches, David; Young, Julie
2007-01-01
To help address continuing disparities in academic achievement and under-representation of disadvantaged groups in math and science majors and careers, the U.S. Department of Education (ED) established a math and science initiative in 1990 within Upward Bound, a federal grant program known as Upward Bound Math-Science (UBMS) designed to provide…
Federal Programs Supporting Educational Change, Vol. 2: Factors Affecting Change Agent Projects.
ERIC Educational Resources Information Center
Berman, Paul; Pauly, Edward W.
This second volume in the change-agent series reports the interim results of an exploratory statistical analysis of a survey of a nationwide sample of 293 change-agent projects funded by four federal demonstration programs--Elementary Secondary Education Act (ESEA) Title III, Innovative Projects; ESEA Title VII, Bilingual Projects; Vocational…
Embarking on College and Career: Interim Evaluation of Urban Alliance. Research Report
ERIC Educational Resources Information Center
Theodos, Brett; Pergamit, Michael R.; Hanson, Devlin; Edelstein, Sara; Daniels, Rebecca
2016-01-01
Urban Alliance serves at-risk youth through its high school internship program, which provides training, mentoring, and work experience to high school seniors from distressed communities. The program aims to help youth move on to higher education or employment after graduation. The Urban Institute is conducting a six-year, randomized controlled…
ERIC Educational Resources Information Center
O'Regan, Fred; Conway, Maureen
The Aspen Institute's ongoing action-research program, Local Employment Approaches for the Disadvantaged (LEAD), assessed 60 programs nationally. Local initiatives fell into four general categories, with numerous subcategories: self-employment, job training and placement, job creation and retention, and community-based finance. A second breakdown…
40 CFR 96.284 - Opt-in process.
Code of Federal Regulations, 2010 CFR
2010-07-01
... TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS FOR STATE IMPLEMENTATION PLANS CAIR SO2 Opt-in Units... of interim review, if the plan appears to contain information demonstrating that the SO2 emissions... section, the owner or operator shall monitor and report the SO2 emissions rate and the heat input of the...
Home Start Evaluation Study. Interim Case Studies IIa.
ERIC Educational Resources Information Center
Fein, Robert
This formative evaluation study of Home Start uses a case study approach. A brief case study focuses on the administrative structure and staff resources and responsibilities of National Home Start. Also included are reports on seven local programs developed after two field visits had been made to each program. In the first visit, objectives chosen…
DOT National Transportation Integrated Search
1982-01-01
This study sought to evaluate the impact of the four basic treatment combinations of the rehabilitation component of the Virginia driver improvement program. It was found that receipt of a warning letter from the Division of Motor Vehicles had no eff...
ERIC Educational Resources Information Center
Behr, Shirley K.; And Others
The interim report presents an evaluation of TADS (Technical Assistance Development System) through case studies of TADS technical assistance to the staffs of two demonstration programs for preschool handicapped children and their families. Purposes of the study included obtaining indepth descriptions of the technical assistance process to…
EPA issues interim final waste minimization guidance
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bergeson, L.L.
1993-08-01
The U.S. Environmental Protection Agency (EPA) has released a new and detailed interim final guidance to assist hazardous waste generators in certifying they have a waste minimization program in place under the Resource Conservation and Recovery Act (RCRA). EPA's guidance identifies the basic elements of a waste minimization program in place that, if present, will allow people to certify they have implemented a program to reduce the volume and toxicity of hazardous waste to the extent economically practical. The guidance is directly applicable to generators of 1000 or more kilograms per month of hazardous waste, or large-quantity generators, and tomore » owners and operators of hazardous waste treatment, storage or disposal facilities who manage their own hazardous waste on site. Small-quantity generators that generate more than 100 kilograms, but less than 1,000 kilograms, per month of hazardous waste are not subject to the same program in place certification requirement. Rather, they must certify on their manifests that they have made a good faith effort to minimize their waste generation.« less
IVHS Architecture Development Program, Interim Status Report
DOT National Transportation Integrated Search
1994-04-01
A MAJOR NATIONAL INITIATIVE IS UNDERWAY TO APPLY PROVEN INFORMATION, COMMUNICATIONS AND CONTROL TECHNOLOGIES TO SURFACE TRANSPORTATION TO IMPROVE ITS EFFICIENCY AND REDUCE ITS NEGATIVE IMPACTS. COLLECTIVELY, THESE APPLICATIONS ARE KNOWN AS INTELLIGEN...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jenkins, R.G.; Siergiej, J.M.
1962-12-28
In a program to develop a complete manufacturing process for ihe production of beryllium channels, techniques are being sought for drawing to obtain a flnal product meeting specifications more rigorous than are obtainable by direct extrusion. Progress in designing and procuring the special tooling required to draw complex shapes at elevated temperature is described, and the flrst set of draw dies is evaluated with respect to design and quality. Three experimental draw attempts have been made on U-channels, in addition to draw tests on flats. (auth)
ERIC Educational Resources Information Center
Meaders, O. Donald, Ed.; Ekpo-ufot, Abel, Ed.
The Shared-Time Concept project was one of several projects conducted under a grant for a developmental vocational education research and teacher education program based on a clinical school concept. The objectives were (1) to determine the extent and nature of use of shared-time concept for conducting vocational education programs, and (2) to…
2016-12-15
In 2011 and 2012, the Secretary, Department of Health and Human Services (HHS), promulgated regulations designed to govern the World Trade Center (WTC) Health Program (Program), including the processes by which eligible responders and survivors may apply for enrollment in the Program, obtain health monitoring and treatment for WTC-related health conditions, and appeal enrollment and treatment decisions, as well as a process to add new conditions to the List of WTC-Related Health Conditions (List). After using the regulations for a number of years, the Administrator of the WTC Health Program identified potential improvements to certain existing provisions, including, but not limited to, appeals of enrollment, certification, and treatment decisions, as well as the procedures for the addition of health conditions for WTC Health Program coverage. He also identified the need to add new regulatory provisions, including, but not limited to, standards for the disenrollment of a WTC Health Program member and decertification of a certified WTC-related health condition. A notice of proposed rulemaking was published on August 17, 2016; this action addresses public comments received on that proposed rulemaking, as well as three interim final rules promulgated since 2011, and finalizes the proposed rule and three interim final rules.
Development and Ground Testing of a Compactly Stowed Scalable Inflatably Deployed Solar Sail
NASA Technical Reports Server (NTRS)
Lichodziejewski, David; Derbes, Billy; Reinert, Rich; Belvin, Keith; Slade, Kara; Mann, Troy
2004-01-01
This paper discusses the solar sail design and outlines the interim accomplishments to advance the technology readiness level (TRL) of the subsystem from 3 toward a technology readiness level of 6 in 2005. Under Phase II of the program many component test articles have been fabricated and tested successfully. Most notably an unprecedented section of the conically deployed rigidizable sail support beam, the heart of the inflatable rigidizable structure, has been deployed and tested in the NASA Goddard thermal vacuum chamber with good results. The development testing validated the beam packaging and deployment. The inflatable conically deployed, Sub Tg rigidizable beam technology is now in the TRL 5-6 range. The fabricated masses and structural test results of our beam components have met predictions and no changes to the mass estimates or design assumptions have been identified adding great credibility to the design. Several quadrants of the Mylar sail have also been fabricated and successfully deployed validating our design, manufacturing, and deployment techniques.
Performance and life evaluation of advanced battery technologies for electric vehicle applications
NASA Astrophysics Data System (ADS)
Deluca, W. H.; Gillie, K. R.; Kulaga, J. E.; Smaga, J. A.; Tummillo, A. F.; Webster, C. E.
Advanced battery technology evaluations are performed under simulated electric vehicle (EV) operating conditions at the Argonne Analysis and Diagnostic Laboratory (ADL). The ADL provides a common basis for both performance characterization and life evaluation with unbiased application of tests and analyses. This paper summarizes the performance characterizations and life evaluations conducted in 1990 on nine single cells and fifteen 3- to 360-cell modules that encompass six technologies: (Na/S, Zn/Br, Ni/Fe, Ni/Cd, Ni-metal hydride, and lead-acid). These evaluations were performed for the Department of Energy and Electric Power Research Institute. The results provide battery users, developers, and program managers an interim measure of the progress being made in battery R and D programs, a comparison of battery technologies, and a source of basic data for modelling and continuing R and D.
Interim Enforcement Program Response Guidance to Public Data Access Issues
Written to assist EPA and states when the ECHO web site was launched, this document provides guidance on questions that can arise when compliance and enforcement data are made available to the public.
76 FR 22802 - Interim Enforcement Policy for Minimum Days Off Requirements
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-25
... NRC's fitness for duty regulations and will remain in place until the NRC publishes a revised rule... Code of Federal Regulations, Part 26, ``Fitness for Duty Programs.'' The Commission updated the...
ERIC Educational Resources Information Center
National Archives and Records Administration, 2006
2006-01-01
The Secretary is adopting as final, with changes, interim final regulations in: 34 CFR part 691 for the Academic Competitiveness Grant (ACG) and National Science and Mathematics Access to Retain Talent Grant (National SMART Grant) programs; 34 CFR part 668 (Student Assistance General Provisions); and 34 CFR part 690 (Federal Pell Grant Program).…
ERIC Educational Resources Information Center
Walker, Robert W.; Hemp, Paul E.
A study was made of Phase 1 of the long-term standards program for agricultural occupations programs for Illinois community colleges. The unique feature of this project was the procedure used to maximize the input of community college teachers in the validation and revision of the national standards. Survey instruments were sent to community…
NASA Presentation to TechAmerica G12 Committee
NASA Technical Reports Server (NTRS)
LaBel, Kenneth A.; Sampson, Michael J.
2011-01-01
This slide presentation reviews some of the actions that NASA is taking to address the issue of counterfeit electronic parts. While the emphasis is on electronic parts, the vision is broad enough to include materials and software. The effort includes coordination with other agencies, to identify and with the Government-Industry Data Exchange Program (GIDEP). An interim GIDEP Policy for suspected counterfeits was instituted. NASA's recommendation to the policy was for identification of the supplier and suggests allowing access to that information by government only. The issues with the General MIL specification, the testing requirements for radiation issues, the continuing development of Class Y standards for electronic equipment, status of package case isolation tests needed for 750 and 883,enhancement of 750 Internal Visual Inspection are reviewed. Further issues with consistent ESD control conditions across commodities, test methods, humidity limits, etc are briefly reviewed. The cost benefit analysis of film versus Real time radiography are also reviewed.
Project Physics Programmed Instruction, Vectors 1.
ERIC Educational Resources Information Center
Harvard Univ., Cambridge, MA. Harvard Project Physics.
This programmed instruction booklet is an interim version of instructional materials being developed by Harvard Project Physics. It is the first in a series of three booklets on vectors and covers the definitions of vectors and scalars, drawing vector quantities to scale, and negative vectors. For others in this series, see SE 015 550 and SE 015…
Project Physics Programmed Instruction, Waves 1.
ERIC Educational Resources Information Center
Harvard Univ., Cambridge, MA. Harvard Project Physics.
This programmed instruction booklet is an interim version of instructional materials being developed by Harvard Project Physics. It is the first of two booklets on the topic of waves and covers pulses, how pulses travel, and what happens when two pulses pass through the same region at the same time. For the second booklet in this series, see SE…
ERIC Educational Resources Information Center
Alberta Dept. of Education, Edmonton. Curriculum Branch.
This planning and instructional manual is designed to assist teachers in implementing the 20 10-credit-hour courses that make up the 26-level occupational component of the Integrated Occupational Program (IOP) in Alberta, Canada. (The IOP was developed to assist students who experience difficulties in secondary education and to help students make…
ERIC Educational Resources Information Center
Alberta Dept. of Education, Edmonton. Curriculum Standards Branch.
This document contains materials for teachers to use in presenting the community health strand of the career and technology studies (CTS) program that has been approved for secondary schools in Alberta, Canada. The first three sections outline the philosophy/rationale, organization, and curriculum and assessment standards of the CTS program in…
Career Potential Among ROTC Enrollees: A Comparison of 1972 and 1973 Survey Results. Interim Report.
ERIC Educational Resources Information Center
Fisher, Allan H., Jr.; And Others
This document presents the results of a comprehensive 1973 Reserve Officer Training Program (ROTC) survey of enrollment potential and career potential for a variety of college-based military officer training programs. It indicates the extent of career motivation among 1973 enrollees and makes comparisons with a similar survey of 1972 enrollees.…
ERIC Educational Resources Information Center
German, Carl, Jr.
The major purpose of this guide is to elicit the information necessary for writing educational specifications for facilities to house technical education programs in metallurgy. It is organized in these parts: (1) Part I discusses the major purpose, underlying assumptions, recent instructional trends, and guiding principles utilized in the…
ERIC Educational Resources Information Center
Greene-McIntyre, Mary; Finch, Mary Hayes; Searcy, John
2003-01-01
An Alabama initiative aimed to improve access to oral health care for Medicaid-eligible children through four components: improved Medicaid claims processing, increased reimbursement for providers, outreach and educational activities to support providers, and parent and patient education about children's oral health. In the first 3 program years,…
78 FR 24047 - Wage Methodology for the Temporary Non-Agricultural Employment H-2B Program, Part 2
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-24
... Employment and Training Administration 20 CFR Part 655 RIN 1205-AB69 Wage Methodology for the Temporary Non-Agricultural Employment H- 2B Program, Part 2 AGENCY: Employment and Training Administration, Labor; U.S. Citizenship and Immigration Services, DHS. ACTION: Interim final rule; request for comments. SUMMARY: The...
Home Start Evaluation Study. Interim Report II: Program Analysis. Revised Draft.
ERIC Educational Resources Information Center
Deloria, Dennis; And Others
This document is the second in a series of evaluative reports directed to evaluation needs of Home Start planners and administrators. It focuses on implementation data about programs gathered during local site visits conducted in the spring and fall of 1972. The two basic evaluative questions asked are: (1) What was Home Start intended by its…
State-Wide Evaluation of the New Hampshire ESEA Title II, Part D Grant Program. Interim Report
ERIC Educational Resources Information Center
Knestis, Kirk; Smoke-Zur, Naomi; Higgins, Cathy
2010-01-01
The Title II-D grant program, "Enhancing Education Through Technology," (EETT) provides financial assistance to higher poverty school districts that have the greatest need for technology support or have been identified as being in need of improvement. In 2009, the American Reinvestment and Recovery Act (ARRA) provided an additional $650…
Extended-Day Kindergarten versus Half-Day Kindergarten: What One School District Decided.
ERIC Educational Resources Information Center
Firlik, Russell
The New Canaan Public Schools reduced its extended-day (21 hours per week) kindergarten program to half-day sessions (15 hours per week) in an interim program during a 2-year school construction-expansion phase. During a 9-month planning process, an ad hoc committee representing equal membership of teachers and parents from three elementary…
Andrade, Verónica; Martínez, Alejandra; Rojas, Ninón; Bello-Toledo, Helia; Flores, Paulo; Sánchez-Sanhueza, Gabriela; Catalán, Alfonso
2018-05-01
Interim restorations are occasionally left in the mouth for extended periods and are susceptible to bacterial infiltration. Thus, dental interim cements with antibacterial properties are required. The purpose of this in vitro study was to determine in vitro antibacterial activity against Streptococcus mutans and to compare the diametrical tensile strength (DTSs) of dental interim cement modified with zinc oxide nanoparticles (ZnO-NPs) with that of cement modified with terpenes. Antibacterial properties of ZnO-NPs, terpenes, and dental interim cement modified with ZnO-NPs and cement modified with terpenes against S mutans were tested according to minimum inhibitory concentration (MIC) and direct contact inhibition (DCI). Tensile strength levels were evaluated using DTS. Results were analyzed using the Kolmogorov-Smirnov, ANOVA, and Tamhane tests (α=.05). The MICs of ZnO-NPs and terpenes against S mutans were 61.94 μg/g and 0.25% v/v, respectively. The DCI assay under the cylinders of cement (area of contact with the agar surface) revealed significant bacterial growth inhibition on Temp-Bond NE specimens with ZnO-NPs at MIC of 495.2 μg/g (8× MIC) and with terpenes at MIC 0.999% v/v (4× MIC) (P<.05). The Temp-Bond NE cement cylinder (control group) showed the lowest DTS (1.05 ±0.27 MPa) of all other test groups. In the Zn-NPs group, the greatest increase occurred in the NP8 (8× MIC; 495.2 μg/g) group with a value of 1.50 ±0.23 MPa, a significant increase in DTS compared with the control and terpene groups (P<.05). In the terpene group, the highest increase corresponded to group T2 (2× MIC; 0.4995% v/v) with a value of 1.29 ±0.18 MPa. The addition of terpenes and ZnO-NPs to interim cement showed antibacterial activity when in contact with S. mutans ATCC 25175. Both terpenes and ZnO-NPs antimicrobial agents increased diametral tensile strength. Copyright © 2017 Editorial Council for the Journal of Prosthetic Dentistry. Published by Elsevier Inc. All rights reserved.
Government-Industry Data Exchange Program (GIDEP) and NASA Advisories
NASA Technical Reports Server (NTRS)
Sampson, Michael J.
2010-01-01
This viewgraph presentation reviews the Government-Industry Data Exchange Program (GIDEP) and NASA Advisories policy to practice. The contents include: 1) Purpose of the Government-Industry Data Exchange Program (GIDEP); 2) NASA and GSFC Documentation; 3) NASA Advisories, differences from GIDEP; 4) GIDEP Distribution by Originator; 5) New Interim GIDEP Policy for Suspect Counterfeits; 6) NASA and Suspect Counterfeits; 7) Threats to GIDEP; and 8) Conclusions and Contact Information.
Assessing Weapon System Acquisition Cycle Times: Setting Program Schedules
2015-06-01
additional research, focused as follows: 1 . Acquisition schedule development: How are schedules for acquisition programs actually set and how are they...the germinating requirements documents specific to systems reviewed. A clear statement was found for only one system (Air and Missile Defense Radar...AMDR) when specific threat capabilities were projected to be operational. • Program schedule setting varies in rigor: 1 Up to the interim version of
Grabber arm mechanism for the Italian Research Interim Stage (IRIS)
NASA Technical Reports Server (NTRS)
Turci, Edmondo
1987-01-01
Two deployable arms, named grabbers, were designed and manufactured to provide lateral stability of the perigee spinning stage which will be deployed from the Space Shuttle cargo bay. The spinning stage is supported by a spin table on a cradle at its base. The Italian Research Interim Stage (IRIS) is designed to carry satellites of intermediate mass up to 900 kg. The requirements are defined and the mechanism is described. Functional test results are presented.
NAVSTAR GPS Simulation and Analysis Program (Interim Report)
DOT National Transportation Integrated Search
1983-10-01
This study assesses the capability of the planned NAVSTAR Global Positioning System (GPS) to meet civil navigation requirements. When it becomes operational in about 1983, NAVSTAR GPS will provide accurate two-dimensional and three-dimensional servic...
Experimental use of geogrids as an alternative to gravel placement : interim report - first year.
DOT National Transportation Integrated Search
2001-02-01
With the ongoing demand for improved infrastructure, the Maine Department of : Transportation (MDOT) continues to identify and evaluate new and innovative : construction methods and materials. The Departments Capital Highway Improvement : Program ...
Human factors experiments for data link : interim report 1
DOT National Transportation Integrated Search
1972-11-01
This report discusses three experiments aimed at providing information pertinent to the Data Link Operational Experiments Program. Section 1. describes the evaluation of the WIDCOM, a visual display, and a voice synthesizer for providing ATC informat...
NASA Technical Reports Server (NTRS)
2002-01-01
The NASA/Navy Benchmarking Exchange (NNBE) was undertaken to identify practices and procedures and to share lessons learned in the Navy's submarine and NASA's human space flight programs. The NNBE focus is on safety and mission assurance policies, processes, accountability, and control measures. This report is an interim summary of activity conducted through October 2002, and it coincides with completion of the first phase of a two-phase fact-finding effort.In August 2002, a team was formed, co-chaired by senior representatives from the NASA Office of Safety and Mission Assurance and the NAVSEA 92Q Submarine Safety and Quality Assurance Division. The team closely examined the two elements of submarine safety (SUBSAFE) certification: (1) new design/construction (initial certification) and (2) maintenance and modernization (sustaining certification), with a focus on: (1) Management and Organization, (2) Safety Requirements (technical and administrative), (3) Implementation Processes, (4) Compliance Verification Processes, and (5) Certification Processes.
The Time Needed to Implement the Blue Ribbon Commission Recommendation on Interim Storage - 13124
DOE Office of Scientific and Technical Information (OSTI.GOV)
Voegele, Michael D.; Vieth, Donald
2013-07-01
The report of the Blue Ribbon Commission on America's Nuclear Future [1] makes a number of important recommendations to be considered if Congress elects to redirect U.S. high-level radioactive waste disposal policy. Setting aside for the purposes of this discussion any issues related to political forces leading to stopping progress on the Yucca Mountain project and driving the creation of the Commission, an important recommendation of the Commission was to institute prompt efforts to develop one or more consolidated storage facilities. The Blue Ribbon Commission noted that this recommended strategy for future storage and disposal facilities and operations should bemore » implemented regardless of what happens with Yucca Mountain. It is too easy, however, to focus on interim storage as an alternative to geologic disposal. The Blue Ribbon Commission report does not go far enough in addressing the magnitude of the contentious problems associated with reopening the issues of relative authorities of the states and federal government with which Congress wrestled in crafting the Nuclear Waste Policy Act [2]. The Blue Ribbon Commission recommendation for prompt adoption of an interim storage program does not appear to be fully informed about the actions that must be taken, the relative cost of the effort, or the realistic time line that would be involved. In essence, the recommendation leaves to others the details of the systems engineering analyses needed to understand the nature and details of all the operations required to reach an operational interim storage facility without derailing forever the true end goal of geologic disposal. The material presented identifies a number of impediments that must be overcome before the country could develop a centralized federal interim storage facility. In summary, and in the order presented, they are: 1. Change the law, HJR 87, PL 107-200, designating Yucca Mountain for the development of a repository. 2. Bring new nuclear waste legislation to the floor of the Senate, overcoming existing House support for Yucca Mountain; 3. Change the longstanding focus of Congress from disposal to storage; 4. Change the funding concepts embodied in the Nuclear Waste Policy Act to allow the Nuclear Waste fund to be used to pay for interim storage; 5. Reverse the Congressional policy not to give states or tribes veto or consent authority, and to reserve to Congress the authority to override a state or tribal disapproval; 6. Promulgate interim storage facility siting regulations to reflect the new policies after such changes to policy and law; 7. Complete already underway changes to storage and transportation regulations, possibly incorporating changes to reflect changes to waste disposal law; 8. Promulgate new repository siting regulations if the interim storage facility is to support repository development; 9. Identify volunteer sites, negotiate agreements, and get Congressional approval for negotiated benefits packages; 10. Design, License and develop the interim storage facility. The time required to accomplish these ten items depends on many factors. The estimate developed assumes that certain of the items must be completed before other items are started; given past criticisms of the current program, such an assumption appears appropriate. Estimated times for completion of individual items are based on historical precedent. (authors)« less
Settlement study : final report.
DOT National Transportation Integrated Search
1982-09-01
This report covers field observations of several medium and high embankments' settlement along Interstate Highways 12 and 20. The predictive settlements from laboratory tests (consolidation tests) are given in an interim report published in July, 198...
NASA Technical Reports Server (NTRS)
Pride, R. A.
1978-01-01
Interim results from a number of ongoing, long-term environmental effects programs for composite materials are reported. The flight service experience is evaluated for 142 composite aircraft components after more than five years and one million successful component flight hours. Ground-based outdoor exposures of composite material coupons after 3 years of exposure at five sites have reached equilibrium levels of moisture pickup which are predictable. Solar ultraviolet-induced material loss is discussed for these same exposures. No significant degradation has been observed in residual strength for either stressed or unstressed specimens, or for exposures to aviation fuels and fluids.
16 CFR 1209.34 - Qualification testing.
Code of Federal Regulations, 2010 CFR
2010-01-01
....34 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION CONSUMER PRODUCT SAFETY ACT REGULATIONS INTERIM SAFETY STANDARD FOR CELLULOSE INSULATION Certification § 1209.34 Qualification testing. (a... labelers, or importers may select samples for qualification testing of a product in any manner they desire. ...
A pavement management research program for Oregon highways : interim report.
DOT National Transportation Integrated Search
1985-03-01
This is the first in a series of reports documenting progress on a statewide pavement management research project. The overall project is conducting research into pavement life cycles of different rehabilitation treatment; the cost-effectiveness of e...
Evaluation of arterial service patrol programs.
DOT National Transportation Integrated Search
2009-12-01
This evaluation of the Arterial Service Patrol named I-64 Traffic Response (TR) is an interim report covering the first full year of operation. This Arterial Service Patrol was part of a regional traffic management strategy to address mobility issues...
ERIC Educational Resources Information Center
Spencer, Lynn, Ed.
These 7 case studies are part of a series of documents on the evaluation of Project Developmental Continuity (PDC), a Head Start demonstration program aimed at providing educational and developmental continuity between children's Head Start and primary school experiences. Each case study reviews the planning year at a PDC demonstration site in one…
ERIC Educational Resources Information Center
Spencer, Lynn, Ed.
These 8 case studies are part of a series of documents on the evaluation of Project Developmental Continuity (PDC), a Head Start demonstration program aimed at providing educational and developmental continuity between children's Head Start and primary school experiences. Each case study reviews the planning year at a PDC demonstration site in one…
30 CFR 250.911 - If my platform is subject to the Platform Verification Program, what must I do?
Code of Federal Regulations, 2010 CFR
2010-07-01
... a project management timeline, Gantt Chart, that depicts when interim and final reports required by... 30 Mineral Resources 2 2010-07-01 2010-07-01 false If my platform is subject to the Platform Verification Program, what must I do? 250.911 Section 250.911 Mineral Resources MINERALS MANAGEMENT SERVICE...
ERIC Educational Resources Information Center
Oregon State Univ., Corvallis.
The report describes the organizational phase of a project designed to create program models and supporting literature for exploratory industrial career development programs for grades seven to ten. The project was undertaken by Oregon State University in cooperation with the Oregon State Department of Education and involved the formation of a…
A Cooperative Program Between a City School District and a Suburban School District. Interim Report.
ERIC Educational Resources Information Center
Rochester City School District, NY.
An urban-suburban interdistrict program is described in which efforts were made to correct racial imbalance in both districts. In 1965 free transportation was provided for 25 first grade children who were sent voluntarily from a Rochester, N.Y. public school to six schools in the West Irondequoit district. This longitudinal metropolitan approach…
ERIC Educational Resources Information Center
McIntosh, William A.
This guide lists a series of pivotal questions about the educational program to be offered, and the answers to these questions bear directly on the numbers and kinds of instructional areas needed in the contemplated facilities. Much of the material is presented in a checklist format which allows for consideration of alternatives in facility…
National Home Start Evaluation Interim Report VI. Twelve-Month Program Issues, Outcomes and Costs.
ERIC Educational Resources Information Center
Goodrich, Nancy; And Others
This report assesses the progress of the six summative Home Start projects as evaluation families completed their first twelve months of enrollment. Home Start, a federally-funded 3-year (1972-1975) home-based demonstration program for low-income families with 3- to 5-year-old children was designed to enhance a mother's skills in dealing with her…
ERIC Educational Resources Information Center
Calhoun, Dave
Systemic reform of mathematics and science education in K-12 schools, sponsored by the National Science Foundation (NSF), was instituted in 1991. Built into the initiatives were guidelines for local (internal) evaluation of programs. This paper is a summary of the evaluation conceptualizations and efforts of one evaluator at the Fresno Unified…
Summary report, Flexible VSR`s and VSR channel sleeve development programs
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kempf, F.J.
1963-11-15
(VSR = vertical safety rod.) This report summarizes results of development programs which have evaluated vertical rod channel sleeving materials and provided flexible vertical rods, acceptable for both interim use before rod channel sleeving, and for subsequent use in sleeved channels. B{sub 4}C is the rod material; graphite and Al oxide are among the sleeve materials.
ERIC Educational Resources Information Center
Richburg-Hayes, Lashawn; Patel, Reshma; Brock, Thomas; de la Campa, Elijah; Rubb, Timothy; Valenzuela, Ireri
2015-01-01
One of the original purposes of student financial aid was to ensure fairer access to post-secondary education to those least able to afford it and to those traditionally underrepresented. Various federal and state programs were put in place to achieve this goal, including the federal Pell Grant and state aid programs. Yet policymakers and…
ERIC Educational Resources Information Center
Symons, Sarah L.; Colgoni, Andrew; Harvey, Chad T.
2017-01-01
We describe interim results of an ongoing longitudinal pedagogical study investigating the efficacy of the Honours Integrated Science Program (iSci). We describe the pedagogical methods we use to prompt research skill development in a model from instructor-dependence to independent original research. We also describe a tool we use to help students…
2017-05-19
The Health Resources and Services Administration (HRSA) administers section 340B of the Public Health Service Act (PHSA), referred to as the "340B Drug Pricing Program" or the "340B Program." HRSA published a final rule on January 5, 2017, that set forth the calculation of the ceiling price and application of civil monetary penalties. The final rule applied to all drug manufacturers that are required to make their drugs available to covered entities under the 340B Program. In accordance with a January 20, 2017, memorandum from the Assistant to the President and Chief of Staff, entitled "Regulatory Freeze Pending Review," HRSA issued an interim final rule that delayed the effective date of the final rule published in the Federal Register (82 FR 1210, (January 5, 2017)) to May 22, 2017. HHS invited commenters to provide their views on whether a longer delay of the effective date to October 1, 2017, would be more appropriate. After consideration of the comments received on the interim final rule, HHS is delaying the effective date of the January 5, 2017 final rule, to October 1, 2017.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-29
...This final rule with comment period addresses changes to the physician fee schedule and other Medicare Part B payment policies to ensure that our payment systems are updated to reflect changes in medical practice and the relative value of services. It finalizes the calendar year (CY) 2010 interim relative value units (RVUs) and issues interim RVUs for new and revised procedure codes for CY 2011. It also addresses, implements, or discusses certain provisions of both the Affordable Care Act (ACA) and the Medicare Improvements for Patients and Providers Act of 2008 (MIPPA). In addition, this final rule with comment period discusses payments under the Ambulance Fee Schedule (AFS), the Ambulatory Surgical Center (ASC) payment system, and the Clinical Laboratory Fee Schedule (CLFS), payments to end-stage renal disease (ESRD) facilities, and payments for Part B drugs. Finally, this final rule with comment period also includes a discussion regarding the Chiropractic Services Demonstration program, the Competitive Bidding Program for durable medical equipment, prosthetics, orthotics, and supplies (CBP DMEPOS), and provider and supplier enrollment issues associated with air ambulances.
75 FR 10645 - Low Pathogenic Avian Influenza; Voluntary Control Program and Payment of Indemnity
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-09
...We are adopting as a final rule, with changes, an interim rule that amended the regulations by establishing, under the auspices of the National Poultry Improvement Plan, a voluntary program for the control of the H5/H7 subtypes of low pathogenic avian influenza in commercial poultry. As amended by this document, the rule provides that the amount of indemnity for which contract growers are eligible will be reduced by any payment they have already received on their contracts when poultry in their care are destroyed, clarifies the roles of cooperating State agencies with respect to H5/H7 low pathogenic avian influenza outbreaks, provides that consistency with humane euthanasia guidelines will be considered when selecting a method for the destruction of poultry, and provides additional guidance for cleaning and disinfecting an affected premises. The control program and indemnity provisions established by the interim rule are necessary to help ensure that the H5/H7 subtypes of low pathogenic avian influenza are detected and eradicated when they occur within the United States.
DOT National Transportation Integrated Search
2002-08-01
With the ongoing demand for improved infrastructure, the Maine Department of Transportation (MDOT) : continues to identify and evaluate new and innovative construction methods and materials. The : Departments Capital Highway Improvement Program (C...
Mobile satellite service for Canada
NASA Technical Reports Server (NTRS)
Sward, David
1988-01-01
The Mobile Satellite (MSAT) system and a special program designed to provide interim mobile satellite services (IMSS) during the construction phase of MSAT are described. A mobile satellite system is a key element in extending voice and and data telecommunications to all Canadians.
Vibratory roller evaluation study : interim report No. 1.
DOT National Transportation Integrated Search
1974-08-01
The Louisiana Department of Highways has in progress a two phase program to evaluate the use of vibratory rollers in the compaction of asphaltic concrete pavements. Phase one on the first construction project is now complete with eight different vibr...
DOT National Transportation Integrated Search
2004-07-01
With the ongoing demand for improved infrastructure, the Maine Department of Transportation (MDOT) : continues to identify and evaluate new and innovative construction methods and materials. The : Departments Capital Highway Improvement Program (C...
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 5 2010-07-01 2010-07-01 false Hearing. 57.807 Section 57.807 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) PRIMARY NONFERROUS SMELTER ORDERS Waiver of Interim Requirement for Use of Continuous Emission Reduction Technology...
This report report details the issues involved in implementing the Clean Air Act's Prevention of Significant Deterioration (PSD) program permittingrequirements for new and modified sources of greenhouse gases (GHGs).
Implementation of high performance concrete in Louisiana bridges : interim report.
DOT National Transportation Integrated Search
1998-02-01
The report contains a research plan to assist in the implementation of high performance concrete in the Charenton Canal Bridge in Louisiana. The research involves a literature review, plan review, development of a quality control program for the conc...
Louisiana experimental base project : interim report No. 1.
DOT National Transportation Integrated Search
1979-11-01
The Louisiana Experimental Base Project is a research study evaluating the design/performance characteristics of three types of base courses as incorporated into comparable flexible pavement systems on a full-scale test road. Fourteen different test ...
40 CFR 92.12 - Interim provisions.
Code of Federal Regulations, 2012 CFR
2012-07-01
... specified in § 92.212(c)(2)(v). (i) Diesel test fuels. Manufacturers and remanufacturers may use LSD or ULSD... determine your cycle-weighted emission rates as specified in subpart B of this part. If you test using LSD...
40 CFR 92.12 - Interim provisions.
Code of Federal Regulations, 2014 CFR
2014-07-01
... specified in § 92.212(c)(2)(v). (i) Diesel test fuels. Manufacturers and remanufacturers may use LSD or ULSD... determine your cycle-weighted emission rates as specified in subpart B of this part. If you test using LSD...
40 CFR 92.12 - Interim provisions.
Code of Federal Regulations, 2013 CFR
2013-07-01
... specified in § 92.212(c)(2)(v). (i) Diesel test fuels. Manufacturers and remanufacturers may use LSD or ULSD... determine your cycle-weighted emission rates as specified in subpart B of this part. If you test using LSD...
40 CFR 92.12 - Interim provisions.
Code of Federal Regulations, 2011 CFR
2011-07-01
... specified in § 92.212(c)(2)(v). (i) Diesel test fuels. Manufacturers and remanufacturers may use LSD or ULSD... determine your cycle-weighted emission rates as specified in subpart B of this part. If you test using LSD...
Testing Prepares Students to Learn Better: The Forward Effect of Testing in Category Learning
ERIC Educational Resources Information Center
Lee, Hee Seung; Ahn, Dahwi
2018-01-01
The forward effect of testing occurs when testing on previously studied information facilitates subsequent learning. The present research investigated whether interim testing on initially studied materials enhances the learning of new materials in category learning and examined the metacognitive judgments of such learning. Across the 4…
40 CFR 600.117 - Interim provisions.
Code of Federal Regulations, 2014 CFR
2014-07-01
... fuel economy values using gasoline test fuel as specified in 40 CFR 86.113-04(a), regardless of any testing with Tier 3 test fuel under paragraph (b) of this section. (b) Manufacturers may demonstrate that... economy measurements using the gasoline test fuel specified in 40 CFR 86.113-04(a), as long as this test...
Flyash in continuous reinforced PCC pavement and lean concrete base : interim report.
DOT National Transportation Integrated Search
1986-08-01
The objectives of this test section were: 1) To test and evaluate the physical characteristics of flyash concrete in comparison to non-flyash concrete. Tests will be conducted to see if flyash strength, and if the current specifications for flyash ca...
Developing Guidelines for HIV Antibody Testing among Victims of Pediatric Sexual Abuse.
ERIC Educational Resources Information Center
Gellert, George A.; And Others
1990-01-01
An interim set of human immunodeficiency virus (HIV) testing guidelines for victims of pediatric sexual abuse (PSA) is proposed. Guidelines are based on responses of 63 practitioners of PSA assessment to 7 hypothetical clinical profiles with 12 testing criteria. (Author/DB)
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-01
...Title I of the James Zadroga Health and Compensation Act of 2010 amended the Public Health Service Act (PHS Act) by adding Title XXXIII, which establishes the World Trade Center (WTC) Health Program. Sections 3311, 3312, and 3321 of Title XXXIII of the PHS Act require that the WTC Program Administrator develop regulations to implement portions of the WTC Health Program established within the Department of Health and Human Services (HHS). The WTC Health Program, which will be administered in part by the Director of the National Institute for Occupational Safety and Health (NIOSH), within the Centers for Disease Control and Prevention (CDC), will provide medical monitoring and treatment to eligible firefighters and related personnel, law enforcement officers, and rescue, recovery and cleanup workers who responded to the September 11, 2001, terrorist attacks in New York City, Shanksville, PA, and at the Pentagon, and to eligible survivors of the New York City attacks. This interim final rule establishes the processes by which eligible responders and survivors may apply for enrollment in the WTC Health Program, obtain health monitoring and treatment for WTC-related health conditions, and appeal enrollment and treatment decisions. This interim final rule also establishes a process for the certification of health conditions, and reimbursement rates for providers who provide initial health evaluations, treatment, and health monitoring.
Hsueh, Eddy C; DeBloom, James R; Lee, Jonathan; Sussman, Jeffrey J; Covington, Kyle R; Middlebrook, Brooke; Johnson, Clare; Cook, Robert W; Slingluff, Craig L; McMasters, Kelly M
2017-08-29
A 31-gene expression profile (GEP) test that provides risk classification of cutaneous melanoma (CM) patients has been validated in several retrospective studies. The objective of the reported study was a prospective evaluation of the GEP performance in patients enrolled in two clinical registries. Three-hundred twenty two CM patients enrolled in the EXPAND (NCT02355587) and INTEGRATE (NCT02355574) registries met the criteria of age ≥ 16 years, successful GEP result and ≥1 follow-up visit for inclusion in this interim analysis. Primary endpoints were recurrence-free (RFS), distant metastasis-free (DMFS), and overall survival (OS). Median follow-up was 1.5 years for event-free patients. Median age for subjects was 58 years (range 18-87) and median Breslow thickness was 1.2 mm (range 0.2-12.0). Eighty-eight percent (282/322) of cases had stage I/II disease and 74% (237/322) had a SLN biopsy. Seventy-seven percent (248/322) had class 1 molecular profiles. 1.5-year RFS, DMFS, and OS rates were 97 vs. 77%, 99 vs. 89%, and 99 vs. 92% for class 1 vs. class 2, respectively (p < 0.0001 for each). Multivariate Cox regression showed Breslow thickness, mitotic rate, and GEP class to significantly predict recurrence (p < 0.01), while tumor thickness was the only significant predictor of distant metastasis and overall survival in this interim analysis. Interim analysis of patient outcomes from a combined prospective cohort supports the 31-gene GEP's ability to stratify early-stage CM patients into two groups with significantly different metastatic risk. RFS outcomes in this real-world cohort are consistent with previously published analyses with retrospective specimens. GEP testing complements current clinicopathologic features and increases identification of high-risk patients. ClinicalTrials.gov, NCT02355574 and NCT02355587.
ERIC Educational Resources Information Center
Morris, Mary; And Others
Third in a series of six, this volume reports findings concerning the impact of Project Developmental Continuity (PDC) on the parents of the evaluation study's cohort of children as well as preliminary findings on the relationship between family characteristics and program outcome variables up to the time the children had completed grade 1. Begun…
ERIC Educational Resources Information Center
Rosario, Jose; And Others
As part of a longitudinal study evaluating program effects, this report, the second in a series of six, describes the impact of Project Developmental Continuity (PDC) on the institutional policies and procedures of participating Head Start centers and elementary schools up to the time the evaluation study's cohort of children had completed grade…
ERIC Educational Resources Information Center
Tracor, Inc., Austin, TX.
Produced in four parts, this report covers a study of poor people in Austin, Texas, begun in 1967. Initial research efforts defined the problem and identified the population to be studied. An interim report was then made on the first year's findings. This involved evaluating some of the community action programs (CAP) and identifying and analyzing…
ERIC Educational Resources Information Center
ERICKSEN, GERALD L.; RYAN, JAMES J.
A REPORT IS GIVEN OF THE FIRST 3 YEARS OF A FIELD STUDY CONDUCTED TO DETERMINE THE EFFECTIVENESS OF SEVERAL PROTOTYPE, SECONDARY MATHEMATICS PROGRAMS THAT WERE PRODUCED BY DIFFERENT CURRICULUM DEVELOPMENT GROUPS. MATHEMATICS TEACHERS WHO HAD NO PREVIOUS EXPERIENCE WITH "MODERN" OR EXPERIMENTAL APPROACHES TO MATHEMATICS TAUGHT A SELECTED…
ERIC Educational Resources Information Center
National Academy of Sciences - National Research Council, Washington, DC. Office of International Affairs.
This study was conducted to provide the U.S. Department of State with an assessment of the potential impacts on science of a United States withdrawal from UNESCO and to suggest possible alternative arrangements to maintain essential U.S. scientific contacts with UNESCO-sponsored programs in case the United States were no longer a member of UNESCO…
ERIC Educational Resources Information Center
Ellis, James D.; Maxwell, Donald E.
The purposes of the Colorado Science Teaching Enhancement Program (CO-STEP) are to improve the background in science content and the instructional skills of teachers in grades four through six throughout Colorado and to support the implementation of effective instruction. A network of six Teacher Development Centers in Colorado coordinate teacher…
Code of Federal Regulations, 2010 CFR
2010-07-01
... 2 NOX averaging, banking and trading programs work? 86.1861-04 Section 86.1861-04 Protection of... work? (a) General provisions for Tier 2 credits and debits. (1) A manufacturer whose Tier 2 fleet... to a full useful life of 100,000 miles, provided that the credits are prorated by a multiplicative...
An interim overview of LDEF materials findings
NASA Technical Reports Server (NTRS)
Stein, Brad A.
1992-01-01
The flight and retrieval of the National Aeronautics and Space Administration's Long Duration Exposure Facility (LDEF) provided an opportunity for the study of the low-Earth orbit (LEO) environment and long-duration space environmental effects (SEE) on materials that is unparalleled in the history of the U.S. Space Program. The remarkable flight attitude stability of LDEF enables specific analyses of various individual and combined effects of LEO environmental parameters on identical materials on the same space vehicle. This paper provides an overview of the interim LDEF materials findings of the Principal Investigators and the Materials Special Investigation Group. In general, the LDEF data is remarkably consistent; LDEF will provide a 'benchmark' for materials design data bases for satellites in low-Earth orbit. Some materials were identified to be encouragingly resistant to LEO SEE for 5.8 years; other 'space qualified' materials displayed significant environmental degradation. Molecular contamination was widespread; LDEF offers an unprecedented opportunity to provide a unified perspective of unmanned LEO spacecraft contamination mechanisms. New material development requirements for long-term LEO missions have been identified and current ground simulation testing methods/data for new, durable materials concepts can be validated with LDEF results. LDEF findings are already being integrated into the design of Space Station Freedom.
NASA Technical Reports Server (NTRS)
Martinovic, Zoran N.; Cerro, Jeffrey A.
2002-01-01
This is an interim user's manual for current procedures used in the Vehicle Analysis Branch at NASA Langley Research Center, Hampton, Virginia, for launch vehicle structural subsystem weight estimation based on finite element modeling and structural analysis. The process is intended to complement traditional methods of conceptual and early preliminary structural design such as the application of empirical weight estimation or application of classical engineering design equations and criteria on one dimensional "line" models. Functions of two commercially available software codes are coupled together. Vehicle modeling and analysis are done using SDRC/I-DEAS, and structural sizing is performed with the Collier Research Corp. HyperSizer program.
2009-06-03
This interim final rule with comment period implements revised Medicare severity long-term care diagnosis-related group (MS-LTC-DRG) relative weights for payment under the long-term care hospital (LTCH) prospective payment system (PPS) for federal fiscal year (FY) 2009. We are revising the MS-LTC-DRG relative weights for FY 2009 due to the misapplication of our established methodology in the calculation of the budget neutrality factor. The revised FY 2009 MS-LTC-DRG relative weights are effective for the remainder of FY 2009 (that is, from June 3, 2009 through September 30, 2009).
Face Gear Technology for Aerospace Power Transmission Progresses
NASA Technical Reports Server (NTRS)
2005-01-01
The use of face gears in an advanced rotorcraft transmission design was first proposed by the McDonnell Douglas Helicopter Company during their contracted effort with the U.S. Army under the Advanced Rotorcraft Transmission (ART) program. Face gears would be used to turn the corner between the horizontal gas turbine engine and the vertical output rotor shaft--a function currently done by spiral bevel gears. This novel gearing arrangement would substantially lower the drive system weight partly because a face gear mesh would be used to split the input power between two output gears. However, the use of face gears and their ability to operate successfully at the speeds and loads required for an aerospace environment was unknown. Therefore a proof-of-concept phase with an existing test stand at the NASA Lewis Research Center was pursued. Hardware was designed that could be tested in Lewis' Spiral Bevel Gear Test Rig. The initial testing indicated that the face gear mesh was a feasible design that could be used at high speeds and load. Surface pitting fatigue was the typical failure mode, and that could lead to tooth fracture. An interim project was conducted to see if slight modifications to the gear tooth geometry or an alternative heat treating process could overcome the surface fatigue problems. From the initial and interim tests, it was apparent that for the surface fatigue problems to be overcome the manufacturing process used for this component would have to be developed to the level used for spiral bevel gears. The current state of the art for face gear manufacturing required using less than optimal gear materials and manufacturing techniques because the surface of the tooth form does not receive final finishing after heat treatment as it does for spiral bevel gears. This resulted in less than desirable surface hardness and manufacturing tolerances. An Advanced Research and Projects Agency (ARPA) Technology Reinvestment Project has been funded to investigate the effects of manufacturing process improvements on the operating characteristics of face gears. The program is being conducted with McDonnell Douglas Helicopter Co., Lucas Western Inc., the University of Illinois at Chicago, and a NASA/U.S. Army team. The goal of the project is develop the grinding process, experimentally verify the improvement in face gear fatigue life, and conduct a full-scale helicopter transmission test. The theory and methodology to grind face gears has been completed, and manufacture of the test hardware is ongoing. Experimental verification on test hardware is scheduled to begin in fiscal 1996.
INTERIM METHOD FOR THE DETERMINATION OF ASBESTOS IN BULK INSULATION SAMPLES
The U.S. Environmental Protection Agency Asbestos-in-Schools Program was established in March, 1979 to provide information and technical assistance to the public for addressing problems presented by asbestos-containing insulation materials in school buildings. Because there were ...
40 CFR 265.113 - Closure; time allowed for closure.
Code of Federal Regulations, 2010 CFR
2010-07-01
... includes an amended waste analysis plan, ground-water monitoring and response program, human exposure....113 Section 265.113 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND...
40 CFR 57.813 - Final decision.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 5 2010-07-01 2010-07-01 false Final decision. 57.813 Section 57.813 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) PRIMARY NONFERROUS SMELTER ORDERS Waiver of Interim Requirement for Use of Continuous Emission Reduction Technology...
40 CFR 142.22 - Review of State variances, exemptions and schedules.
Code of Federal Regulations, 2010 CFR
2010-07-01
... (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS IMPLEMENTATION Review of...) Not later than 18 months after the effective date of the interim national primary drinking water... (and schedules prescribed pursuant thereto) by the States with primary enforcement responsibility...
Land Use Management for Solid Waste Programs
ERIC Educational Resources Information Center
Brown, Sanford M., Jr.
1974-01-01
The author discusses the problems of solid waste disposal and examines various land use management techniques. These include the land use plan, zoning, regionalization, land utilities, and interim use. Information concerning solid waste processing site zoning and analysis is given. Bibliography included. (MA)
16 CFR 1209.36 - Production testing.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION CONSUMER PRODUCT SAFETY ACT REGULATIONS INTERIM SAFETY STANDARD FOR CELLULOSE INSULATION Certification § 1209.36 Production testing. (a) General... manufactured to demonstrate that the product being manufactured is substantially similar to the product which...
Analysis of Transportation Options for Commercial Spent Fuel in the U.S.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kalinina, Elena; Busch, Ingrid Karin
The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S.more » Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF) and high and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF) and high and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF) and highand associated transportation of spent nuclear fuel (SNF) and high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF) and high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF)...« less
40 CFR 799.9346 - TSCA 90-day inhalation toxicity.
Code of Federal Regulations, 2012 CFR
2012-07-01
...) should be used for each test group. (B) If interim sacrifices are planned, the number of animals shall be... substantially alter the chemical or toxicological properties of the test substance. (ii) One lot of the test... control group. Except for treatment with the test substance, animals in the control group shall be handled...
40 CFR 799.9346 - TSCA 90-day inhalation toxicity.
Code of Federal Regulations, 2014 CFR
2014-07-01
...) should be used for each test group. (B) If interim sacrifices are planned, the number of animals shall be... substantially alter the chemical or toxicological properties of the test substance. (ii) One lot of the test... control group. Except for treatment with the test substance, animals in the control group shall be handled...
40 CFR 799.9346 - TSCA 90-day inhalation toxicity.
Code of Federal Regulations, 2010 CFR
2010-07-01
...) should be used for each test group. (B) If interim sacrifices are planned, the number of animals shall be... substantially alter the chemical or toxicological properties of the test substance. (ii) One lot of the test... control group. Except for treatment with the test substance, animals in the control group shall be handled...
40 CFR 799.9346 - TSCA 90-day inhalation toxicity.
Code of Federal Regulations, 2011 CFR
2011-07-01
...) should be used for each test group. (B) If interim sacrifices are planned, the number of animals shall be... substantially alter the chemical or toxicological properties of the test substance. (ii) One lot of the test... control group. Except for treatment with the test substance, animals in the control group shall be handled...
40 CFR 799.9346 - TSCA 90-day inhalation toxicity.
Code of Federal Regulations, 2013 CFR
2013-07-01
...) should be used for each test group. (B) If interim sacrifices are planned, the number of animals shall be... substantially alter the chemical or toxicological properties of the test substance. (ii) One lot of the test... control group. Except for treatment with the test substance, animals in the control group shall be handled...
2013-01-01
An injector needle is shown for each test in Figure 41. UNCLASSIFIED 37 UNCLASSIFIED Full Needle 60°C Ultra Low Sulfur Diesel 60°C...UNCLASSIFIED EVALUATION OF FUTURE FUELS IN A HIGH PRESSURE COMMON RAIL SYSTEM – PART 2 2011 FORD 6.7L DIESEL ENGINE INTERIM REPORT TFLRF...UNCLASSIFIED UNCLASSIFIED EVALUATION OF FUTURE FUELS IN A HIGH PRESSURE COMMON RAIL SYSTEM – PART 2 2011 FORD 6.7L DIESEL ENGINE INTERIM REPORT TFLRF
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-05-01
This report describes the environmental surveillance program at the Colonie Interim Storage Site (CISS) and provides the results for 1992. The site is located in eastern New York State, approximately 6.4 km (4.0 mi) northwest of downtown Albany. From 1958 to 1984, National Lead (NL) Industries used the facility to manufacture various components from depleted and enriched uranium natural thorium. Environmental monitoring of CISS began in 1984 when Congress added, the site to the US Department of Energy`s (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP is a program established to identify and decontaminate or otherwise control sites wheremore » residual radioactive materials remain from the early years of the nation`s atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The environmental surveillance program at CISS includes sampling networks for external gamma radiation exposure and for thorium-232 and total uranium concentrations in surface water, sediment, and groundwater. Several chemical parameters are also measured in groundwater, including total metals, volatile organics, and water quality parameters. This surveillance program assists in fulfilling the DOE policy of measuring and monitoring effluents from DOE activities and calculating hypothetical doses. Results are compared with applicable Environmental Protection Agency (EPA) and New York State Department of Environmental Conservation (NYSDEC) standards, DOE derived concentration guides (DCGs), dose limits, and other DOE requirements.« less
10 CFR 431.401 - Petitions for waiver, and applications for interim waiver, of test procedure.
Code of Federal Regulations, 2013 CFR
2013-01-01
... more design characteristics which prevent testing of the basic model according to the prescribed test... its true energy consumption characteristics as to provide materially inaccurate comparative data. (2... design characteristic(s) constituting the grounds for the petition, and the specific requirements sought...
10 CFR 431.401 - Petitions for waiver, and applications for interim waiver, of test procedure.
Code of Federal Regulations, 2011 CFR
2011-01-01
... more design characteristics which prevent testing of the basic model according to the prescribed test... its true energy consumption characteristics as to provide materially inaccurate comparative data. (2... particular basic model(s) for which a waiver is requested, the design characteristic(s) constituting the...
10 CFR 431.401 - Petitions for waiver, and applications for interim waiver, of test procedure.
Code of Federal Regulations, 2012 CFR
2012-01-01
... more design characteristics which prevent testing of the basic model according to the prescribed test... its true energy consumption characteristics as to provide materially inaccurate comparative data. (2... design characteristic(s) constituting the grounds for the petition, and the specific requirements sought...
10 CFR 430.27 - Petitions for waiver and applications for interim waiver.
Code of Federal Regulations, 2013 CFR
2013-01-01
... design characteristics which either prevent testing of the basic model according to the prescribed test... faucets, showerheads, water closets, and urinals) as to provide materially inaccurate comparative data. (2... contains a design characteristic which either prevents testing of the basic model according to the...
10 CFR 430.27 - Petitions for waiver and applications for interim waiver.
Code of Federal Regulations, 2012 CFR
2012-01-01
... design characteristics which either prevent testing of the basic model according to the prescribed test... faucets, showerheads, water closets, and urinals) as to provide materially inaccurate comparative data. (2... contains a design characteristic which either prevents testing of the basic model according to the...
10 CFR 431.401 - Petitions for waiver, and applications for interim waiver, of test procedure.
Code of Federal Regulations, 2014 CFR
2014-01-01
... more design characteristics which prevent testing of the basic model according to the prescribed test... its true energy consumption characteristics as to provide materially inaccurate comparative data. (2... design characteristic(s) constituting the grounds for the petition, and the specific requirements sought...
10 CFR 431.401 - Petitions for waiver, and applications for interim waiver, of test procedure.
Code of Federal Regulations, 2010 CFR
2010-01-01
... more design characteristics which prevent testing of the basic model according to the prescribed test... its true energy consumption characteristics as to provide materially inaccurate comparative data. (2... particular basic model(s) for which a waiver is requested, the design characteristic(s) constituting the...
10 CFR 430.27 - Petitions for waiver and applications for interim waiver.
Code of Federal Regulations, 2014 CFR
2014-01-01
... design characteristics which either prevent testing of the basic model according to the prescribed test... faucets, showerheads, water closets, and urinals) as to provide materially inaccurate comparative data. (2... contains a design characteristic which either prevents testing of the basic model according to the...
7 CFR 91.24 - Reports of test results.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 3 2010-01-01 2010-01-01 false Reports of test results. 91.24 Section 91.24... SERVICES AND GENERAL INFORMATION Reporting § 91.24 Reports of test results. (a) Results of analyses are... may call the appropriate Science and Technology laboratory for interim or final results prior to...
EPA Releases Draft Policy to Reduce Animal Testing for Skin Sensitization
The document, Draft Interim Science Policy: Use of Alternative Approaches for Skin Sensitization as a Replacement for Laboratory Animal Testing, describes the science behind the non-animal alternatives that can now be used to identify skin sensitization.
This document provides guidance to site managers and Remedial Project Managers who are legally responsible for the management of a site on how to design and conduct technically defensible ecological risk assessments for the Superfund program.
77 FR 4674 - State Fiscal Stabilization Fund Program
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-31
... and competing priorities that States were facing in meeting the SFSF data collection and reporting... the interim final requirement (i.e., the notice of proposed revisions to certain data collection and... collection instructions; respondents can provide the requested data in the desired format; reporting burden...
The Homestake Interim Laboratory and Homestake DUSEL
NASA Astrophysics Data System (ADS)
Lesko, Kevin T.
2011-12-01
The former Homestake gold mine in Lead South Dakota is proposed for the National Science Foundation's Deep Underground Science and Engineering Laboratory (DUSEL). The gold mine provides expedient access to depths in excess of 8000 feet below the surface (>7000 mwe). Homestake's long history of promoting scientific endeavours includes the Davis Solar Neutrino Experiment, a chlorine-based experiment that was hosted at the 4850 Level for more than 30 years. As DUSEL, Homestake would be uncompromised by competition with mining interests or other shared uses. The facility's 600-km of drifts would be available for conversion for scientific and educational uses. The State of South Dakota, under Governor Rounds' leadership, has demonstrated exceptionally strong support for Homestake and the creation of DUSEL. The State has provided funding totalling $46M for the preservation of the site for DUSEL and for the conversion and operation of the Homestake Interim Laboratory. Motivated by the strong educational and outreach potential of Homestake, the State contracted a Conversion Plan by world-recognized mine-engineering contractor to define the process of rehabilitating the facility, establishing the appropriate safety program, and regaining access to the facility. The State of South Dakota has established the South Dakota Science and Technology Authority to oversee the transfer of the Homestake property to the State and the rehabilitation and preservation of the facility. The Homestake Scientific Collaboration and the State of South Dakota's Science and Technology Authority has called for Letters of Interest from scientific, educational and engineering collaborations and institutions that are interested in hosting experiments and uses in the Homestake Interim Facility in advance of the NSF's DUSEL, to define experiments starting as early as 2007. The Homestake Program Advisory Committee has reviewed these Letters and their initial report has been released. Options for developing the Homestake Interim Laboratory and evolving this facility into DUSEL are presented.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-30
... Stress Tests at Banking Organizations With Total Consolidated Assets of More Than $10 Billion But Less... Stress Test Cycle AGENCY: Board of Governors of the Federal Reserve System (Board). ACTION: Interim final... framework) in their stress tests for the stress test cycle that begins October 1, 2013. For this stress test...
Jensen, Arna-Lee; Abbott, Paul V
2007-10-01
The purpose of this study was to design an experimental model that allowed extensive endodontic interim restorations to be tested for dye penetration while under simulated masticatory load. Extracted premolar teeth had standardized mesio-occluso-distal cavities prepared, and the root canals were instrumented. A cotton wool pellet was placed in the pulp chamber, and the cavities were restored with Cavit, IRM, Ketac-Fil Plus, Ketac-Silver, or composite resin (Z100). They were subjected to the equivalent of 3 months of clinical load while exposed to methylene blue dye. Results of this study could not support IRM as a suitable interim endodontic restorative material to use in extensive cavities. The dye penetration in the Ketac-Fil Plus and Ketac-Silver specimens was not predictable, and the results suggested Cavit and Z100 composite resin require further investigations as potentially useful materials for this purpose.
Wu, Wenting; Bot, Brian; Hu, Yan; Geyer, Susan M; Sargent, Daniel J
2013-07-01
Sargent and Goldberg [1] proposed a randomized phase II flexible screening design (SG design) which took multiple characteristics of candidate regimens into consideration in selecting a regimen for further phase III testing. In this paper, we extend the SG design by including provisions for an interim analysis and/or a comparison to a historical control. By including a comparison with a historical control, a modified SG design not only identifies a more promising treatment but also assures that the regimen has a clinically meaningful level of efficacy as compared to a historical control. By including an interim analysis, a modified SG design could reduce the number of patients exposed to inferior treatment regimens. When compared to the original SG design, the modified designs increase the sample size moderately, but expand the utility of the flexible screening design substantially. Copyright © 2013 Elsevier Inc. All rights reserved.
ERIC Educational Resources Information Center
New York State Interdepartmental Fuel and Energy Committee, Albany.
After presenting the background of the availability of fuel for transportation and the increasing per capita energy consumption, the report examines the State's role in energy conservation. Five proposals are outlined: (1) a coordinated education program designed to increase public awareness of the current energy situation; (2) a pilot program of…
The small-scale treatability study sample exemption
DOE Office of Scientific and Technical Information (OSTI.GOV)
Coalgate, J.
1991-01-01
In 1981, the Environmental Protection Agency (EPA) issued an interim final rule that conditionally exempted waste samples collected solely for the purpose of monitoring or testing to determine their characteristics or composition'' from RCRA Subtitle C hazardous waste regulations. This exemption (40 CFR 261.4(d)) apples to the transportation of samples between the generator and testing laboratory, temporary storage of samples at the laboratory prior to and following testing, and storage at a laboratory for specific purposes such as an enforcement action. However, the exclusion did not include large-scale samples used in treatability studies or other testing at pilot plants ormore » other experimental facilities. As a result of comments received by the EPA subsequent to the issuance of the interim final rule, the EPA reopened the comment period on the interim final rule on September 18, 1987, and specifically requested comments on whether or not the sample exclusion should be expanded to include waste samples used in small-scale treatability studies. Almost all responders commented favorably on such a proposal. As a result, the EPA issued a final rule (53 FR 27290, July 19, 1988) conditionally exempting waste samples used in small-scale treatability studies from full regulation under Subtitle C of RCRA. The question of whether or not to extend the exclusion to larger scale as proposed by the Hazardous Waste Treatment Council was deferred until a later date. This information Brief summarizes the requirements of the small-scale treatability exemption.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-05-01
This report describes the environmental surveillance program at the Wayne Interim Storage Site (WISS) and provides the results for 1992. The fenced, site, 32 km (20 mi) northwest of Newark, New Jersey, was used between 1948 and 1971 for commercial processing of monazite sand to separate natural radioisotopes - predominantly thorium. Environmental surveillance of WISS began in 1984 in accordance with Department of Energy (DOE) Order 5400.1 when Congress added the site to DOE`s Formerly Utilized Sites Remedial Action Program (FUSRAP). The environmental surveillance program at WISS includes sampling networks for radon and thoron in air; external gamma radiation exposure;more » radium-226, radium-228, thorium-230, thorium-232, total uranium, and several chemicals in surface water and sediment; and total uranium, radium-226, radium-228, thorium-230, thorium-232, and organic and inorganic chemicals in groundwater. Monitoring results are compared with applicable Environmental Protection Agency (EPA) and state standards, DOE derived concentration guides (DCGs), dose limits, and other DOE requirements. This monitoring program assists in fulfilling the DOE policy of measuring and monitoring effluents from DOE activities and calculating hypothetical doses. Results for environmental surveillance in 1992 show that the concentrations of all radioactive and most chemical contaminants were below applicable standards.« less
Polymer modified asphalt in hot mix pavement : interim report, executive summary.
DOT National Transportation Integrated Search
1988-11-01
This report presents a summary of a literature review to determine the most appropriate testing procedures for use with polymer modified asphalts. In examining testing procedures, it was necessary to study the effects of polymer modifiers on both bin...
Tire/pavement and environmental traffic noise research study : interim report - 2009 testing.
DOT National Transportation Integrated Search
2011-01-01
This research study is being conducted in response to CDOTs interest in traffic noise in general, and the tire/pavement : interaction in particular. Following a rigid set of testing protocols, data is being collected on highway traffic noise : cha...
International Translation of Project EX: A Teen Tobacco Use Cessation Program
Sussman, Steve
2013-01-01
Aims There are relatively few documented teen tobacco use cessation efforts outside the United States (U.S.). Project EX is an evidence-based program that consists of eight sessions, as a school-based clinic tobacco cessation-only version and a classroom-based prevention and cessation version. This paper provides a ‘snapshot’ of progress on international translation of ProjectEXpilot study work in eight countries that have been approached thus far. The program was implemented in Wuhan, China; Israel and partners; Bashkortostan, Russia; and Elche, Spain. Implementation is planned for Vienna, Austria; Mumbai, India; and Bangkok, Thailand. This work will lead eventually to a greater understanding regarding preference for type of programming (e.g., clinic versus classroom modality), challenges in recruitment and retention, program receptivity, and short-term (approximately 3-month post-program) quit rates. Protocol and Interim Results of International Translation of Project EX Convenience samples are being recruited based on previous contacts with each location. A protocol was sent to each location, proposing a controlled design, in which subjects enter cessation groups or become a wait-list control, with an immediate pretest, posttest, and 3-month follow-up. Language translation of program materials was completed in seven of the eight locations. Several variations in design and implementation were demanded though. For example, youth fear of reporting tobacco publicly mandated to researchers that the prevention/cessation classroom version be implemented in some locations (Israel and partners, and India). Program effects are suggested across countries. Conclusions Ongoing partnerships with parties actively involved in tobacco control facilitate pilot testing of teen tobacco use cessation programming. The Project EX curriculum appears quite translatable, though having flexibility in implementation modality eased being able to pilot test the program. Research on this cognitive-behavioral, motivation enhancement approach continues. PMID:23885135
IVHS Countermeasures for Rear-End Collisions, Task 1 Vol. III: 1991 NASS CDS Case Analysis
DOT National Transportation Integrated Search
1994-02-15
This report is from the NHTSA sponsored program, "IVHS Countermeasures for Rear-End Collisions". The Task 1 Interim Report consists of six volumes. This Volume, Volume III, 1991 NASS CDS Clinical Case Analysis presents the results of a clinical case ...
Study of Fuel Economy and Emission Reduction Methods for Marine and Locomotive Diesel Engines
DOT National Transportation Integrated Search
1975-09-01
This interim report presents the results of the first phase of a two-part program to investigate methods of improving fuel consumption and reducing exhaust emissions for in-service diesel engines used as prime movers in locomotives and several classe...
7 CFR 280.1 - Interim disaster procedures.
Code of Federal Regulations, 2010 CFR
2010-01-01
... the value of the food actually lost in such disaster but not greater than the applicable maximum... Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE FOOD STAMP AND FOOD DISTRIBUTION PROGRAM EMERGENCY FOOD ASSISTANCE FOR VICTIMS OF DISASTERS § 280...
7 CFR 280.1 - Interim disaster procedures.
Code of Federal Regulations, 2011 CFR
2011-01-01
... the value of the food actually lost in such disaster but not greater than the applicable maximum... Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE FOOD STAMP AND FOOD DISTRIBUTION PROGRAM EMERGENCY FOOD ASSISTANCE FOR VICTIMS OF DISASTERS § 280...
40 CFR 142.22 - Review of State variances, exemptions and schedules.
Code of Federal Regulations, 2012 CFR
2012-07-01
... (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS IMPLEMENTATION Review of...) Not later than 18 months after the effective date of the interim national primary drinking water... scientific matters bearing on such variances and exemptions), and (2) advise of the opportunity to submit...
Health: Overview. Interim Guide.
ERIC Educational Resources Information Center
Manitoba Dept. of Education, Winnipeg.
The Manitoba Health Education Curriculum focuses on promoting the development of positive lifestyle practices in students from kindergarten through grade nine. The core units of the program are: (1) social-emotional well-being; (2) physical well-being; (3) nutrition; (4) dental health; (5) safety; and (6) environmental health. This overview offers…
A risk assessment was conducted by the US Environmental Protection Agency (EPA) as part of the 2003 Interim Registration Eligibility Document (IRED) on atrazine. The assessment indicated potential community- and population-level risk to sensitive aquatic ecosystems at prolonged ...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Peters, T. B.; Bannochie, C. J.
Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of verification of Macrobatch (Salt Batch) 11 for the Interim Salt Disposition Program (ISDP) for processing. This document reports characterization data on the samples of Tank 21H and fulfills the requirements of Deliverable 3 of the Technical Task Request (TTR).
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 1 2010-10-01 2010-10-01 false Evaluation. 30.30-9 Section 30.30-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS GENERAL PROVISIONS Interim Procedures for Evaluating Vessel Personnel Licensing and Certification Programs of Foreign Countries § 30.30-9 Evaluation. Materials...
40 CFR 57.816 - Effect of negative recommendation.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 5 2010-07-01 2010-07-01 false Effect of negative recommendation. 57.816 Section 57.816 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... Reduction Technology § 57.816 Effect of negative recommendation. No waiver of the interim requirement for...
75 FR 55634 - Submission for OMB Review; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-13
...: 1505-0209. Type of Review: Revision of a currently approved collection. Title: Troubled Asset Relief Program--Conflicts of Interest. Abstract: The interim rule sets forth the process for reviewing and addressing actual or potential conflicts of interest among any individuals or entities seeking or having a...
Project International Emphasis Interim Report, July 1991.
ERIC Educational Resources Information Center
Blois, Beverly, Ed.; Williams, Barbara
Project International Emphasis (PIE), a curriculum development effort involving all 24 colleges in the Virginia Community College System (VCCS), focuses on the infusion of globally oriented components across the academic curriculum and in related career development programs. Activities undertaken during the project's first year included an annual…
13 CFR 120.891 - Certifications of disbursement and completion.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 13 Business Credit and Assistance 1 2014-01-01 2014-01-01 false Certifications of disbursement and completion. 120.891 Section 120.891 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.891 Certifications of disbursement...
13 CFR 120.891 - Certifications of disbursement and completion.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 13 Business Credit and Assistance 1 2012-01-01 2012-01-01 false Certifications of disbursement and completion. 120.891 Section 120.891 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.891 Certifications of disbursement...
13 CFR 120.891 - Certifications of disbursement and completion.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Certifications of disbursement and completion. 120.891 Section 120.891 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.891 Certifications of disbursement...
13 CFR 120.891 - Certifications of disbursement and completion.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 13 Business Credit and Assistance 1 2011-01-01 2011-01-01 false Certifications of disbursement and completion. 120.891 Section 120.891 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.891 Certifications of disbursement...
13 CFR 120.891 - Certifications of disbursement and completion.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 13 Business Credit and Assistance 1 2013-01-01 2013-01-01 false Certifications of disbursement and completion. 120.891 Section 120.891 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.891 Certifications of disbursement...
2007-06-25
The Food and Drug Administration (FDA) is issuing an interim final rule (IFR) that sets forth a procedure for requesting an exemption from the requirement in the final rule "Current Good Manufacturing Practice in Manufacturing, Packaging, Labeling, or Holding Operations for Dietary Supplements," published elsewhere in this issue of the Federal Register, that the manufacturer conduct at least one appropriate test or examination to verify the identity of any component that is a dietary ingredient. This IFR allows for submission to, and review by, FDA of an alternative to the required 100 percent identity testing of components that are dietary ingredients, provided certain conditions are met and establishes a requirement for retention of records relating to the FDA's response to an exemption request.
76 FR 4369 - Interim Deputation Agreements; Interim BIA Adult Detention Facility Guidelines
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-25
... Adult Detention Facility Guidelines AGENCY: Bureau of Indian Affairs, Interior. ACTION: Notice. SUMMARY: This notice announces the online publication of the Interim BIA Adult Detention Facility Guidelines and... Indian Affairs Web site. DATES: These Interim BIA Adult Detention Facility Guidelines and Interim Model...
Recent developments - US spent fuel disposition
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
One of a US utility's major risk factors in continuing to operate a nuclear plant is managing discharged spent fuel. The US Department of Energy (DOE) signed contracts with utilities guaranteeing government acceptance of spent fuel by 1988. However, on December 17, 1992, DOE Secretary Watkins wrote to Sen. J. Bennett Johnston (D-LA), Chairman of the Senate Energy Committee, indicating a reassessment of DOE's programs, the results of which will be presented to Congress in January 1993. He indicated the Department may not be able to meet the 1988 date, because of difficulty in finding a site for the Monitoredmore » Retrievable Storage facility. Watkins indicated that DOE has investigated an interim solution and decided to expedite a program to certify a multi-purpose standardized cask system for spent fuel receipt, storage, transport, and disposal. To meet the expectations of US utilities, DOE is considering a plan to use federal sites for interim storage of the casks. Secretary Watkins recommended the waste program be taken off-budget and put in a revolving fund established to ensure that money already collected from utilities will be available to meet the schedule for completion of the repository.« less
2013-10-30
This final rule implements provisions of the Patient Protection and Affordable Care Act and the Health Care and Education Reconciliation Act of 2010 (collectively referred to as the Affordable Care Act). Specifically, this final rule outlines financial integrity and oversight standards with respect to Affordable Insurance Exchanges, qualified health plan (QHP) issuers in Federally-facilitated Exchanges (FFEs), and States with regard to the operation of risk adjustment and reinsurance programs. It also establishes additional standards for special enrollment periods, survey vendors that may conduct enrollee satisfaction surveys on behalf of QHP issuers, and issuer participation in an FFE, and makes certain amendments to definitions and standards related to the market reform rules. These standards, which include financial integrity provisions and protections against fraud and abuse, are consistent with Title I of the Affordable Care Act. This final rule also amends and adopts as final interim provisions set forth in the Amendments to the HHS Notice of Benefit and Payment Parameters for 2014 interim final rule, published in the Federal Register on March 11, 2013, related to risk corridors and cost-sharing reduction reconciliation.
The cost and impact of the interim federal health program cuts on child refugees in Canada.
Evans, Andrea; Caudarella, Alexander; Ratnapalan, Savithiri; Chan, Kevin
2014-01-01
On June 30, 2012, Interim Federal Health Program (IFHP) funding was cut for refugee claimant healthcare. The potential financial and healthcare impacts of these cuts on refugee claimants are unknown. We conducted a one-year retrospective chart review spanning 6 months before and after IFHP funding cuts at The Hospital for Sick Children, a tertiary care children's hospital in Toronto. We analyzed emergency room visits characteristics, admission rates, reasons for admission, and financial records including billing from Medavie Blue Cross. There were 173 refugee children visits to the emergency room in the six months before and 142 visits in the six months after funding cuts. The total amount billed to the IFHP program during the one-year of this study was $131,615. Prior to the IFHP cuts, 46% of the total emergency room bills were paid by IFHP compared to 7% after the cuts (p<0.001). After the cuts to the IFHP, The Hospital for Sick Children was unable to obtain federal health coverage for the vast majority of refugee claimant children registered under the IFHP. This preliminary analysis showed that post-IFHP cuts healthcare costs at the largest tertiary pediatric institution in the country increased.
40 CFR 1054.145 - Are there interim provisions that apply only for a limited time?
Code of Federal Regulations, 2013 CFR
2013-07-01
... them to us if we ask for them (see 40 CFR 1068.101(a)(2)). (n) Ethanol-blended test fuel for...) California test fuel. Through model year 2019, you may perform testing with a fuel meeting the requirements... Phase 2 test fuel. Any EPA testing with such an engine family may use either this same certification...
Nondiscrimination on the basis of handicap--Office of the Secretary, HHS. Interim final rule.
1983-03-07
The interim final rule modifies existing regulations to meet the exigent needs that can arise when a handicapped infant is discriminatorily denied food or other medical care. Three current regulatory provisions are modified to allow timely reporting of violations, expeditious investigation, and immediate enforcement action when necessary to protect a handicapped infant whose life is endangered by discrimination in a program or activity receiving federal financial assistance. Recipients that provide health care to infants will be required to post a conspicuous notice in locations that provide such care. The notice will describe the protections under federal law against discrimination toward the handicapped, and will provide a contact point in the Department of HHS for reporting violations immediately by telephone.
24 CFR 35.820 - Interim controls.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Interim controls. 35.820 Section 35...-Possession Multifamily Property § 35.820 Interim controls. HUD shall conduct interim controls in accordance... accordance with § 35.815. Interim controls are considered completed when clearance is achieved in accordance...
24 CFR 35.820 - Interim controls.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false Interim controls. 35.820 Section 35...-Possession Multifamily Property § 35.820 Interim controls. HUD shall conduct interim controls in accordance... accordance with § 35.815. Interim controls are considered completed when clearance is achieved in accordance...
Basis for Interim Operation for Fuel Supply Shutdown Facility
DOE Office of Scientific and Technical Information (OSTI.GOV)
BENECKE, M.W.
2003-02-03
This document establishes the Basis for Interim Operation (BIO) for the Fuel Supply Shutdown Facility (FSS) as managed by the 300 Area Deactivation Project (300 ADP) organization in accordance with the requirements of the Project Hanford Management Contract procedure (PHMC) HNF-PRO-700, ''Safety Analysis and Technical Safety Requirements''. A hazard classification (Benecke 2003a) has been prepared for the facility in accordance with DOE-STD-1027-92 resulting in the assignment of Hazard Category 3 for FSS Facility buildings that store N Reactor fuel materials (303-B, 3712, and 3716). All others are designated Industrial buildings. It is concluded that the risks associated with the currentmore » and planned operational mode of the FSS Facility (uranium storage, uranium repackaging and shipment, cleanup, and transition activities, etc.) are acceptable. The potential radiological dose and toxicological consequences for a range of credible uranium storage building have been analyzed using Hanford accepted methods. Risk Class designations are summarized for representative events in Table 1.6-1. Mitigation was not considered for any event except the random fire event that exceeds predicted consequences based on existing source and combustible loading because of an inadvertent increase in combustible loading. For that event, a housekeeping program to manage transient combustibles is credited to reduce the probability. An additional administrative control is established to protect assumptions regarding source term by limiting inventories of fuel and combustible materials. Another is established to maintain the criticality safety program. Additional defense-in-depth controls are established to perform fire protection system testing, inspection, and maintenance to ensure predicted availability of those systems, and to maintain the radiological control program. It is also concluded that because an accidental nuclear criticality is not credible based on the low uranium enrichment, the form of the uranium, and the required controls, a Criticality Alarm System (CAS) is not required as allowed by DOE Order 420.1 (DOE 2000).« less
Phase I interim report : automotive collision avoidance system field operational test
DOT National Transportation Integrated Search
2002-05-30
In June of 1999, the National Highway Traffic Safety Administration entered into a cooperative research agreement with General Motors to advance the state-of-the-art of rear-end collision warning technology and conduct a field operational test of a f...
HARD CHROME POLLUTION PREVENTION DEMONSTRATION PROJECT - INTERIM REPORT
In the project, five chromium emission prevention/control devices were tested tha cover the spectrum of prevention/control techniques currently in use in small- and large-size hard chromium electroplating job shops. The Project results show that some of the tested devices had ch...
Predicting moisture-induced damage to asphaltic concrete : field evaluation phase, interim report.
DOT National Transportation Integrated Search
1977-01-01
Virginia is one of seven state and federal agencies participating in a field evaluation of a stripping test method developed under NCHRP Project 4-8 (3), "Predicting Moisture- Induced Damage to Asphaltic Concrete." The test method is being used to ev...
Sohn, S Y; Gyu Joo, Yong; Kyu Han, Hong
2007-02-01
Financial support on the R&D in Science & Technology for SMEs at the governmental level plays a crucial role on the improvement of the national competitiveness. Korea Science & Engineering Foundation (KOSEF) has supported the R&D projects of SMEs with the competitive technology ability by way of the Science and Technology Promotion Fund. In this paper, we propose a structural equation model (SEM) to evaluate the performance of such a funding program in terms of three aspects: output, outcome and impact under given funding inputs, R&D environment of a recipient company, and external evaluation programs of funding organization. We adopt Malcolm Baldrige National Quality Award (MBNQA) criteria to assess the R&D environmental factors of recipient companies. In addition, we test the effect of interim evaluation of the funded project. The proposed model is applied to the real case and is used to identify the best practices as well as to provide feedback information for the improvement of the government funding programs of the R&D projects of SMEs.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-07
... Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at CERCLA and RCRA Sites AGENCY... Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at Comprehensive Environmental Response... interim PRGs for dioxin in soil. These draft recommended interim PRGs were calculated using existing, peer...
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Options. 35.120 Section 35.120... and Definitions for All Programs. § 35.120 Options. (a) Standard treatments. Where interim controls are required by this part, the designated party has the option to presume that lead-based paint or...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-18
... Determination To Defer Sanctions, Sacramento Metro 1-Hour Ozone Nonattainment Area, California AGENCY... Act (CAA) Section 185 fee program (Termination Determination) for the Sacramento Metro 1- hour Ozone nonattainment area (Sacramento Metro Area) to satisfy anti- backsliding requirements for the 1-hour Ozone...
Tri-level study of the causes of traffic accidents : interim report 1. Vol. 1, research findings
DOT National Transportation Integrated Search
1973-08-31
This is the final report of the first year of activity under a proposed three-year program entitled "Tri-Level Study of the Causes of Traffic Accidents." This study has been performed by the Indiana University institute for Research in Public Safety ...
Cognitive Awareness Research in the Classroom
ERIC Educational Resources Information Center
Hogg, James H.
1975-01-01
A descriptive study to determine the continued effectiveness of a program of cognitive verbal awareness training was carried out over a three year period. It was found that ability to use cognitive verbalizations above the level of stating, or eliciting information remained whether or not interim feedback was given. (Author)
Tri-level study of the causes of traffic accidents : interim report 1. Vol. 2 : appendices
DOT National Transportation Integrated Search
1973-08-31
This is the final report of the first year of activity under a proposed three-year program entitled "Tri-Level Study of the Causes of Traffic Accidents." This study has been performed by the Indiana University Institute for Research in Public Safety ...
40 CFR 258.58 - Implementation of the corrective action program.
Code of Federal Regulations, 2010 CFR
2010-07-01
...) Take any interim measures necessary to ensure the protection of human health and the environment... drinking water supplies or sensitive ecosystems; (iv) Further degradation of the ground-water that may... situations that may pose threats to human health and the environment. (b) An owner or operator may determine...
The Interim Years of Cyberspace
2013-02-01
Atlantic Treaty Organization even went so far as to state that the Stuxnet worm could have caused “a new Chernobyl ” if the program had released the...Messmer, “Stuxnet Could Have Caused ‘New Chernobyl ,’ Russian Ambassador Says,” Network World, 27 January 2011, http://www.networkworld.com/news/2011/012711
2012-07-01
Goiania) and those containing 137Cs and other radionuclides ( Chernobyl ). Another group contains documents relevant to site survey 3 procedures...residents of the contaminated areas. Recovery experience from the Chernobyl incident have demonstrated that direct involvement of inhabitants and local
2012-07-01
on the cleanup of specific sites: those containing only cesium-137 (Goiania) and those containing 137Cs and other radionuclides ( Chernobyl ...targets and consider initiatives to enhance the quality of life of the residents of the contaminated areas. Recovery experience from the Chernobyl
DOT National Transportation Integrated Search
1981-01-01
This report describes a method for locating historic site information using a computer graphics program. If adopted for use by the Virginia Department of Highways and Transportation, this method should significantly reduce the time now required to de...
DOT National Transportation Integrated Search
1987-08-01
One of the primary reasons that highway departments are hesitant to use heat-straightening techniques to repair damaged steel girders is the lack of experimental verification of the process. A comprehensive experimental program on the subject has bee...
School, Work and Family Planning. Interim Impacts in Project Redirection.
ERIC Educational Resources Information Center
Polit, Denise F.; And Others
Project Redirection was designed to help pregnant and parenting adolescents progress toward eventual self-sufficiency by linking them with community agencies and volunteers at four geographically and ethnically diverse sites in the United States. Distinctive features of the program include: (1) a broad scope of services including employability…
75 FR 16564 - High-Speed Intercity Passenger Rail (HSIPR) Program
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-01
... services to avoid shipping delays. Application forms are available at http://www.fra.dot.gov/Pages/2243..., and 501--Intercity Passenger Rail Service Corridor Capital Assistance (codified at 49 U.S.C. chapter... High Speed Rail Corridors and Intercity Passenger Rail Service.'' This document incorporates interim...
Academically Creative Education: An Interim Report.
ERIC Educational Resources Information Center
Southwest Virginia Community Coll., Richlands, VA.
An overview is provided of activities undertaken by Southwest Virginia Community College and the Russell County School System to provide a cost-effective delivery system for education/enrichment opportunities for gifted seniors in rural high schools that lack the "critical mass" to sustain individual on-site programs. The delivery system used an…
This cost-review approach applies to all program and PPG awards made under 40 CFR Part 35, Subpart A, where the recipient has an established, on-going grant relationship with EPA and has adequate internal controls in its personnel.
77 FR 62596 - Interim Guidance on State Freight Plans and State Freight Advisory Committees
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-15
...), Maritime Administration (MARAD), Pipeline and Hazardous Materials Safety Administration (PHSMA), Research... Research Program (23 U.S.C. 505). They may also use carryover balances from National Highway System funds... system's users and to the general public (for example, reductions in crashes, fatalities, and injuries...
Reading First Implementation Evaluation: Interim Report
ERIC Educational Resources Information Center
Moss, Marc; Jacob, Robin; Boulay, Beth; Horst, Megan; Poulos, Jennifer
2006-01-01
In October 2003, the US Department of Education contracted with Abt Associates to design and conduct the Reading First Implementation Evaluation. This report focuses on the following questions: (1) How is the Reading First program implemented in districts and schools? and (2) How does reading instruction differ in Reading First schools and…
Code of Federal Regulations, 2010 CFR
2010-10-01
... SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES MEDICARE PROGRAM PROSPECTIVE PAYMENT SYSTEMS FOR... inpatient psychiatric facility receives payment under this subpart for inpatient operating cost and capital-related costs for each inpatient stay following submission of a bill. (b) Periodic interim payments (PIP...
CNN Newsroom Classroom Guides, February 2002.
ERIC Educational Resources Information Center
Cable News Network, Atlanta, GA.
These classroom guides, designed to accompany the daily CNN (Cable News Network) Newsroom broadcasts for the month of February 2002, provide program rundowns, suggestions for class activities and discussion, student handouts, and a list of related news terms. Top stories include: Afghanistan's interim leader is making a global impression (February…
CETA Demonstration Provides Lessons On Implementing Youth Programs.
1980-12-08
private sector participation, and labor market effects. In addition to a series of reports on specific issues and additional interim reports, MDRC...im, Mr. Gregory J. Ahat 4 1""yDm Director Alian Kotler Human Resources Division IDurid Ihuir U.S. General Accounting Office (.ijbr’E Sfrrw
34 CFR 668.58 - Interim disbursements.
Code of Federal Regulations, 2011 CFR
2011-07-01
..., ACG, National SMART Grant, or campus-based program funds to the applicant; (ii) Employ the applicant..., ACG, National SMART Grant, or campus-based funds; or (ii)(A) May make one disbursement of any combination of Federal Pell Grant, ACG, National SMART Grant, Federal Perkins Loan, or FSEOG funds for the...
34 CFR 668.58 - Interim disbursements.
Code of Federal Regulations, 2010 CFR
2010-07-01
..., ACG, National SMART Grant, or campus-based program funds to the applicant; (ii) Employ the applicant..., ACG, National SMART Grant, or campus-based funds; or (ii)(A) May make one disbursement of any combination of Federal Pell Grant, ACG, National SMART Grant, Federal Perkins Loan, or FSEOG funds for the...
Expanding Job Opportunities for Alaska Natives. (Interim Report).
ERIC Educational Resources Information Center
McDiarmid, G. Williamson; Goldsmith, Scott; Killorin, Mary; Sharp, Suzanne; Hild, Carl
A majority of adults in most Alaska Native villages were without jobs in 1990, and the situation was probably not substantially better in 1998. This report summarizes current Alaska Native employment data and employment trends, provides information on public and private programs that target Native hire, and describes promising approaches for…
42 CFR 413.64 - Payments to providers: Specific rules.
Code of Federal Regulations, 2014 CFR
2014-10-01
... small as possible. (c) Interim payments during initial reporting period. At the beginning of the program... experienced a temporary delay in preparing and submitting bills to the contractor beyond its normal billing.... Recovery of the accelerated payment may be made by recoupment as provider bills are processed or by direct...
Enterprise & Innovation. Teacher Resource Manual. Interim.
ERIC Educational Resources Information Center
Alberta Dept. of Education, Edmonton. Curriculum Branch.
This teacher resource manual is a support document developed to assist teachers responsible for Enterprise and Innovation courses; it is intended to be used in conjunction with the corresponding program of studies in the curriculum for Alberta, Canada. The manual has been developed to assist classroom teachers by providing the following: (1)…
Code of Federal Regulations, 2010 CFR
2010-07-01
... following standards: (1) For equipment with a current per unit fair market value of $5000 or more, the... the cost of the original project or program to the current fair market value of the equipment. (2) If... the current fair market value of the equipment, plus any reasonable shipping or interim storage costs...
Code of Federal Regulations, 2010 CFR
2010-01-01
... or program to the current fair market value of the equipment. If the recipient has no need for the... the current fair market value of the equipment, plus any reasonable shipping or interim storage costs... data, including date of disposal and sales price or the method used to determine current fair market...
42 CFR 8.12 - Federal opioid treatment standards.
Code of Federal Regulations, 2014 CFR
2014-10-01
... appropriate, the program physician may waive the requirement of a 1-year history of addiction under paragraph... personal history, his or her current needs for medical, social, and psychological services, and his or her... preference for pregnant women in admitting patients to interim maintenance and in transferring patients from...
42 CFR 8.12 - Federal opioid treatment standards.
Code of Federal Regulations, 2013 CFR
2013-10-01
... appropriate, the program physician may waive the requirement of a 1-year history of addiction under paragraph... personal history, his or her current needs for medical, social, and psychological services, and his or her... preference for pregnant women in admitting patients to interim maintenance and in transferring patients from...
DOT National Transportation Integrated Search
2000-04-01
In the mid 1990s the Federal Highway Administration (FHWA) established a High Performance Concrete (HPC) program aimed at demonstrating the positive effects of utilizing HPC in bridges. Research on the benefits of using HPC for bridges has shown a nu...
76 FR 69146 - Agricultural Career and Employment Grants Program; Withdrawal
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-08
..., Departmental Management, USDA. ACTION: Proposed rule; withdrawal. SUMMARY: On October 27, 2011, USDA submitted... Regulations section of this issue of the Federal Register, USDA is publishing the interim rule. DATES: As of..., Voice: (202) 205-4215, Fax: (202) 720-7136, Email: [email protected]usda.gov . SUPPLEMENTARY...
DOT National Transportation Integrated Search
2015-07-01
In 2002, the Federal Motor Carrier Safety Administration (FMCSA) issued the New Entrant Program Interim Final Rule in response to the requirement in the Motor Carrier Safety Improvement Act of 1999. The requirement in the Act was based on research fi...