Sample records for test program test

  1. 14 CFR 120.117 - Implementing a drug testing program.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Implementing a drug testing program. 120... AND ALCOHOL TESTING PROGRAM Drug Testing Program Requirements § 120.117 Implementing a drug testing.... (4) A part 145 certificate holder who has your own drug testing program Obtain an Antidrug and...

  2. 14 CFR 120.117 - Implementing a drug testing program.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Implementing a drug testing program. 120... AND ALCOHOL TESTING PROGRAM Drug Testing Program Requirements § 120.117 Implementing a drug testing... 145 certificate holder who has your own drug testing program Obtain an Antidrug and Alcohol Misuse...

  3. 14 CFR 120.117 - Implementing a drug testing program.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Implementing a drug testing program. 120... AND ALCOHOL TESTING PROGRAM Drug Testing Program Requirements § 120.117 Implementing a drug testing... 145 certificate holder who has your own drug testing program Obtain an Antidrug and Alcohol Misuse...

  4. 14 CFR 120.117 - Implementing a drug testing program.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Implementing a drug testing program. 120... AND ALCOHOL TESTING PROGRAM Drug Testing Program Requirements § 120.117 Implementing a drug testing... Specification, Letter of Authorization, or Drug and Alcohol Testing Program Registration from the FAA: If you...

  5. 14 CFR 120.117 - Implementing a drug testing program.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Implementing a drug testing program. 120... AND ALCOHOL TESTING PROGRAM Drug Testing Program Requirements § 120.117 Implementing a drug testing... 145 certificate holder who has your own drug testing program Obtain an Antidrug and Alcohol Misuse...

  6. Spacecraft Testing Programs: Adding Value to the Systems Engineering Process

    NASA Technical Reports Server (NTRS)

    Britton, Keith J.; Schaible, Dawn M.

    2011-01-01

    Testing has long been recognized as a critical component of spacecraft development activities - yet many major systems failures may have been prevented with more rigorous testing programs. The question is why is more testing not being conducted? Given unlimited resources, more testing would likely be included in a spacecraft development program. Striking the right balance between too much testing and not enough has been a long-term challenge for many industries. The objective of this paper is to discuss some of the barriers, enablers, and best practices for developing and sustaining a strong test program and testing team. This paper will also explore the testing decision factors used by managers; the varying attitudes toward testing; methods to develop strong test engineers; and the influence of behavior, culture and processes on testing programs. KEY WORDS: Risk, Integration and Test, Validation, Verification, Test Program Development

  7. 41 CFR 300-90.6 - What is authorized under the test programs?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... the test programs? 300-90.6 Section 300-90.6 Public Contracts and Property Management Federal Travel Regulation System GENERAL AGENCY REQUIREMENTS 90-TELEWORK TRAVEL EXPENSES TEST PROGRAMS § 300-90.6 What is authorized under the test programs? Under a telework expenses test program authorized by the Administrator of...

  8. The Current Often Implemented Fitness Tests in Physical Education Programs: Problems and Future Directions

    ERIC Educational Resources Information Center

    Keating, Xiaofen Deng

    2003-01-01

    This paper aims to examine current nationwide youth fitness test programs, address problems embedded in the programs, and possible solutions. The current Fitnessgram, President's Challenge, and YMCA youth fitness test programs were selected to represent nationwide youth fitness test programs. Sponsors of the nationwide youth fitness test programs…

  9. 77 FR 18793 - Spectrum Sharing Innovation Test-Bed Pilot Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-28

    .... 120322212-2212-01] Spectrum Sharing Innovation Test-Bed Pilot Program AGENCY: National Telecommunications... Innovation Test-Bed pilot program to assess whether devices employing Dynamic Spectrum Access techniques can... Spectrum Sharing Innovation Test-Bed (Test-Bed) pilot program to examine the feasibility of increased...

  10. Definition study of a Variable Cycle Experimental Engine (VCEE) and associated test program and test plan

    NASA Technical Reports Server (NTRS)

    Allan, R. D.

    1978-01-01

    The Definition Study of a Variable Cycle Experimental Engine (VCEE) and Associated Test Program and Test Plan, was initiated to identify the most cost effective program for a follow-on to the AST Test Bed Program. The VCEE Study defined various subscale VCE's based on different available core engine components, and a full scale VCEE utilizing current technology. The cycles were selected, preliminary design accomplished and program plans and engineering costs developed for several program options. In addition to the VCEE program plans and options, a limited effort was applied to identifying programs that could logically be accomplished on the AST Test Bed Program VCE to extend the usefulness of this test hardware. Component programs were provided that could be accomplished prior to the start of a VCEE program.

  11. Development of a preprototype times wastewater recovery subsystem: Appendices

    NASA Technical Reports Server (NTRS)

    Roebelen, G. J., Jr.; Dehner, G. F.

    1984-01-01

    This Master Test Plan outlines the test program to be performed by Hamilton Standard during the Urine Water Recovery Subsystem Program. Testing is divided into three phases: (1) design support testing; development component testing; and acceptance testing. The completion of this test program verifies the subsystem operation.

  12. 40 CFR 91.805 - In-use test program reporting requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 21 2012-07-01 2012-07-01 false In-use test program reporting... Regulations § 91.805 In-use test program reporting requirements. (a) The manufacturer shall electronically... generated from the in-use testing program. The following information must be reported for each test engine...

  13. 40 CFR 91.805 - In-use test program reporting requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 20 2014-07-01 2013-07-01 true In-use test program reporting... Regulations § 91.805 In-use test program reporting requirements. (a) The manufacturer shall electronically... generated from the in-use testing program. The following information must be reported for each test engine...

  14. 40 CFR 91.805 - In-use test program reporting requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 20 2011-07-01 2011-07-01 false In-use test program reporting... Regulations § 91.805 In-use test program reporting requirements. (a) The manufacturer shall electronically... generated from the in-use testing program. The following information must be reported for each test engine...

  15. 40 CFR 91.805 - In-use test program reporting requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 21 2013-07-01 2013-07-01 false In-use test program reporting... Regulations § 91.805 In-use test program reporting requirements. (a) The manufacturer shall electronically... generated from the in-use testing program. The following information must be reported for each test engine...

  16. 40 CFR 91.805 - In-use test program reporting requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false In-use test program reporting... Regulations § 91.805 In-use test program reporting requirements. (a) The manufacturer shall electronically... generated from the in-use testing program. The following information must be reported for each test engine...

  17. Variation in the Viral Hepatitis and HIV Policies and Practices of Methadone Maintenance Programs.

    PubMed

    Jessop, Amy B; Hom, Jeffrey K; Burke, Monika

    Patients prescribed methadone maintenance treatment (MMT) demonstrate elevated prevalence of hepatitis B virus (HBV), hepatitis C virus, and HIV. Government agencies recommend testing for these infections in MMT programs, but uptake is limited. We audited infection-related policies and practices of all 14 MMT programs in Philadelphia, Pennsylvania, in 2015. Results were tabulated and compared with the results from a 2010 audit of 10 of 12 MMT programs. The audit focused on which patients are tested, timing and frequency, specific tests ordered, vaccination, and communication of test results. Written policies were nonspecific, offering little guidance on appropriate testing. The principal change in policy between 2010 and 2015 involved adding clearer guidance for communication of results to patients. In 2010 and 2015, all MMT programs tested new patients for hepatitis C virus antibodies, although retesting of existing patients varied. HBV testing increased from 2010 to 2015, though it was not uniform, with 5 programs testing for HBV surface antibodies and 10 programs testing for HBV surface antigens. Six programs assessed hepatitis vaccination status, but only 1 administered vaccines. In 2010, city-sponsored HIV antibody testing was available at all MMT programs. Without this program in 2015, few MMT programs conducted HIV testing. Despite limited hepatitis and HIV screening in MMT programs nationally, this study shows that testing can be incorporated into routine procedures. MMT programs are positioned to play an integral role in the identification of patients with chronic infections, but additional guidance and resources are required to maximize their impact.

  18. GPS Device Testing Based on User Performance Metrics

    DOT National Transportation Integrated Search

    2015-10-02

    1. Rationale for a Test Program Based on User Performance Metrics ; 2. Roberson and Associates Test Program ; 3. Status of, and Revisions to, the Roberson and Associates Test Program ; 4. Comparison of Roberson and DOT/Volpe Programs

  19. A Comparative Analysis of the Resources Required for Test and Evaluation on Army-Led Weapon System Programs, Based Upon Program Size and Acquisition Management Complexity

    DTIC Science & Technology

    2007-12-01

    Program Manager PMO Program Manager Office POM Program Objective Memorandum PPE Personal Protective Equipment PPT Production Prove...test • Technical feasibility test • Engineering development test • Production prove-out test ( PPT ) • Software qualification test 22 • Live fire...improvement BIDS (P3I) system is equipped with a detection suite to include high volume samplers, a fluorescent particle counter/sizer, a flow

  20. 46 CFR 16.205 - Implementation of chemical testing programs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 1 2010-10-01 2010-10-01 false Implementation of chemical testing programs. 16.205... CHEMICAL TESTING Required Chemical Testing § 16.205 Implementation of chemical testing programs. (a) When a...) Upon written request of an employer, Commandant (CG-545) will review the employer's chemical testing...

  1. 46 CFR 16.205 - Implementation of chemical testing programs.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 1 2011-10-01 2011-10-01 false Implementation of chemical testing programs. 16.205... CHEMICAL TESTING Required Chemical Testing § 16.205 Implementation of chemical testing programs. (a) When a...) Upon written request of an employer, Commandant (CG-545) will review the employer's chemical testing...

  2. 46 CFR 16.205 - Implementation of chemical testing programs.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 1 2013-10-01 2013-10-01 false Implementation of chemical testing programs. 16.205... CHEMICAL TESTING Required Chemical Testing § 16.205 Implementation of chemical testing programs. (a) When a...) Upon written request of an employer, Commandant (CG-INV) will review the employer's chemical testing...

  3. 46 CFR 16.205 - Implementation of chemical testing programs.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 1 2014-10-01 2014-10-01 false Implementation of chemical testing programs. 16.205... CHEMICAL TESTING Required Chemical Testing § 16.205 Implementation of chemical testing programs. (a) When a...) Upon written request of an employer, Commandant (CG-INV) will review the employer's chemical testing...

  4. 46 CFR 16.205 - Implementation of chemical testing programs.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 1 2012-10-01 2012-10-01 false Implementation of chemical testing programs. 16.205... CHEMICAL TESTING Required Chemical Testing § 16.205 Implementation of chemical testing programs. (a) When a...) Upon written request of an employer, Commandant (CG-INV) will review the employer's chemical testing...

  5. 14 CFR 120.105 - Employees who must be tested.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... (CONTINUED) AIR CARRIERS AND OPERATORS FOR COMPENSATION OR HIRE: CERTIFICATION AND OPERATIONS DRUG AND ALCOHOL TESTING PROGRAM Drug Testing Program Requirements § 120.105 Employees who must be tested. Each... an employer as defined in this subpart must be subject to drug testing under a drug testing program...

  6. 14 CFR 120.105 - Employees who must be tested.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... (CONTINUED) AIR CARRIERS AND OPERATORS FOR COMPENSATION OR HIRE: CERTIFICATION AND OPERATIONS DRUG AND ALCOHOL TESTING PROGRAM Drug Testing Program Requirements § 120.105 Employees who must be tested. Each... an employer as defined in this subpart must be subject to drug testing under a drug testing program...

  7. 14 CFR 120.105 - Employees who must be tested.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... (CONTINUED) AIR CARRIERS AND OPERATORS FOR COMPENSATION OR HIRE: CERTIFICATION AND OPERATIONS DRUG AND ALCOHOL TESTING PROGRAM Drug Testing Program Requirements § 120.105 Employees who must be tested. Each... an employer as defined in this subpart must be subject to drug testing under a drug testing program...

  8. 14 CFR 120.105 - Employees who must be tested.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... (CONTINUED) AIR CARRIERS AND OPERATORS FOR COMPENSATION OR HIRE: CERTIFICATION AND OPERATIONS DRUG AND ALCOHOL TESTING PROGRAM Drug Testing Program Requirements § 120.105 Employees who must be tested. Each... an employer as defined in this subpart must be subject to drug testing under a drug testing program...

  9. 14 CFR 120.105 - Employees who must be tested.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... (CONTINUED) AIR CARRIERS AND OPERATORS FOR COMPENSATION OR HIRE: CERTIFICATION AND OPERATIONS DRUG AND ALCOHOL TESTING PROGRAM Drug Testing Program Requirements § 120.105 Employees who must be tested. Each... an employer as defined in this subpart must be subject to drug testing under a drug testing program...

  10. 78 FR 19691 - Applications for New Awards; Advanced Placement (AP) Test Fee Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-02

    ... DEPARTMENT OF EDUCATION Applications for New Awards; Advanced Placement (AP) Test Fee Program... Information Advanced Placement Test Fee Program. Notice inviting applications for new awards for fiscal year... Program: The AP Test Fee program awards grants to eligible State educational agencies (SEAs) to enable...

  11. 77 FR 8848 - Application for New Awards; Advanced Placement (AP) Test Fee Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-15

    ... DEPARTMENT OF EDUCATION Application for New Awards; Advanced Placement (AP) Test Fee Program... Information: Advanced Placement Test Fee Program. Notice inviting applications for new awards for fiscal year... Description Purpose of Program: The AP Test Fee program awards grants to eligible State educational agencies...

  12. 78 FR 73702 - Federal Travel Regulation (FTR); Telework Travel Expenses Test Programs

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-09

    ... done to apply for test program authority? The head of the agency or designee must design the test... agency for travel to the pre-existing duty station. Sec. 300-90.7 What is the duration of test programs... Expenses Test Programs AGENCY: Office of Government-wide Policy, U.S. General Services Administration (GSA...

  13. Reliability Evaluation of Concentrator Photovoltaic Modules per IEC Qualification Specifications

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tamizhmani, Govindasamy

    2012-12-05

    This project is related to the qualification testing of new generation CPV (concentrator photovoltaics) modules at lower testing costs and lower turnaround time. In this project, the first testing program was completed for two CPV manufacturers, the second testing program was completed for two manufacturers at 65% of the actual testing cost and at less than 3 months of testing turnaround time and the third testing program was completed for two manufacturers at 65% of the actual testing cost and at less than 3 months of testing turnaround time. Due to their financial situation and restructuring, Amonix (one of themore » CPV manufacturers) intermittently terminated the test programs.« less

  14. U.S. Aeronautical L-Band Satellite Technology Test Program : Interim Tests Results

    DOT National Transportation Integrated Search

    1975-06-01

    The U.S. Aeronautical L-Band satellite test program was performed between September 1974 and April 1975 as part of an international ATS-6 L-Band satellite test program. The U.S. program consisted of both technology and ATC communications demonstratio...

  15. The advisability of prototypic testing for space nuclear systems

    NASA Astrophysics Data System (ADS)

    Lenard, Roger X.

    2005-07-01

    From October 1987 until 1993, the US Department of Defense conducted the Space Nuclear Thermal Propulsion program. This program's objective was to design and develop a high specific impulse, high thrust-to-weight nuclear thermal rocket engine for upper stage applications. The author was the program manager for this program until 1992. Numerous analytical, programmatic and experimental results were generated during this period of time. This paper reviews the accomplishments of the program and highlights the importance of prototypic testing for all aspects of a space nuclear program so that a reliable and safe system compliant with all regulatory requirements can be effectively engineered. Specifically, the paper will recount how many non-prototypic tests we performed only to have more representative tests consistently generate different results. This was particularly true in area of direct nuclear heat generation. As nuclear tests are generally much more expensive than non-nuclear tests, programs attempt to avoid such tests in favor of less expensive non-nuclear tests. Each time this approach was followed, the SNTP program found these tests to not be verified by nuclear heated testing. Hence the author recommends that wherever possible, a spiral development approach that includes exploratory and confirmatory experimental testing be employed to ensure a viable design.

  16. An overview of the F-117A avionics flight test program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Silz, R.

    1992-02-01

    This paper is an overview of the history of the F-117A avionics flight test program. System design concepts and equipment selections are explored followed by a review of full scale development and full capability development testing. Flight testing the Weapon System Computational Subsystem upgrade and the Offensive Combat Improvement Program are reviewed. Current flight test programs and future system updates are highlighted.

  17. 77 FR 39194 - Combined Drug and Alcohol Testing Programs

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-02

    ...-0688; Notice No. 12-04] RIN 2120-AK01 Combined Drug and Alcohol Testing Programs AGENCY: Federal... tour operations to combine the drug and alcohol testing required for each operation into one testing... programs while maintaining the level of safety intended by the current drug and alcohol testing regulations...

  18. 19 CFR 101.9 - Test programs or procedures; alternate requirements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... requirements. (a) General testing. For purposes of conducting a test program or procedure designed to evaluate... test and the basis for selecting participants; and, (2) Post publication requirement. Within a... 19 Customs Duties 1 2010-04-01 2010-04-01 false Test programs or procedures; alternate...

  19. 19 CFR 101.9 - Test programs or procedures; alternate requirements.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... requirements. (a) General testing. For purposes of conducting a test program or procedure designed to evaluate... test and the basis for selecting participants; and, (2) Post publication requirement. Within a... 19 Customs Duties 1 2013-04-01 2013-04-01 false Test programs or procedures; alternate...

  20. 19 CFR 101.9 - Test programs or procedures; alternate requirements.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... requirements. (a) General testing. For purposes of conducting a test program or procedure designed to evaluate... test and the basis for selecting participants; and, (2) Post publication requirement. Within a... 19 Customs Duties 1 2011-04-01 2011-04-01 false Test programs or procedures; alternate...

  1. 19 CFR 101.9 - Test programs or procedures; alternate requirements.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... requirements. (a) General testing. For purposes of conducting a test program or procedure designed to evaluate... test and the basis for selecting participants; and, (2) Post publication requirement. Within a... 19 Customs Duties 1 2012-04-01 2012-04-01 false Test programs or procedures; alternate...

  2. 78 FR 38455 - Energy Conservation Program: Test Procedures for Electric Motors

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-26

    ... Conservation Program: Test Procedures for Electric Motors; Proposed Rule #0;#0;Federal Register / Vol. 78, No... 431 [Docket No. EERE-2012-BT-TP-0043] RIN 1904-AC89 Energy Conservation Program: Test Procedures for... establishing definitions, specifying testing set-up procedures necessary to test, and extending DOE's existing...

  3. 76 FR 34246 - Automated Commercial Environment (ACE); Announcement of National Customs Automation Program Test...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-13

    ... CBP with authority to conduct limited test programs or procedures designed to evaluate planned... aspects of this test, including the design, conduct and implementation of the test, in order to determine... Environment (ACE); Announcement of National Customs Automation Program Test of Automated Procedures for In...

  4. 47 CFR 73.1620 - Program tests.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 4 2012-10-01 2012-10-01 false Program tests. 73.1620 Section 73.1620... Rules Applicable to All Broadcast Stations § 73.1620 Program tests. (a) Upon completion of construction..., program tests may be conducted in accordance with the following: (1) The permittee of a nondirectional AM...

  5. 47 CFR 73.713 - Program tests.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 4 2011-10-01 2011-10-01 false Program tests. 73.713 Section 73.713... International Broadcast Stations § 73.713 Program tests. (a) Upon completion of construction of an international..., the permittee may request authority to conduct program tests. Such request shall be filed with the FCC...

  6. 78 FR 12259 - Unmanned Aircraft System Test Site Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-22

    ...-0061] Unmanned Aircraft System Test Site Program AGENCY: Federal Aviation Administration (FAA), DOT... Defense, develop a test site program for the integration of unmanned aircraft systems in to the National Airspace System. The overall purpose of this test site program is to develop a body of data and operational...

  7. 47 CFR 73.713 - Program tests.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 4 2012-10-01 2012-10-01 false Program tests. 73.713 Section 73.713... International Broadcast Stations § 73.713 Program tests. (a) Upon completion of construction of an international..., the permittee may request authority to conduct program tests. Such request shall be filed with the FCC...

  8. 47 CFR 73.1620 - Program tests.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 4 2011-10-01 2011-10-01 false Program tests. 73.1620 Section 73.1620... Rules Applicable to All Broadcast Stations § 73.1620 Program tests. (a) Upon completion of construction..., program tests may be conducted in accordance with the following: (1) The permittee of a nondirectional AM...

  9. 77 FR 73056 - Initial Test Programs for Water-Cooled Nuclear Power Plants

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-07

    ... NUCLEAR REGULATORY COMMISSION [NRC-2012-0293] Initial Test Programs for Water-Cooled Nuclear Power... (DG), DG-1259, ``Initial Test Programs for Water-Cooled Nuclear Power Plants.'' This guide describes the general scope and depth that the staff of the NRC considers acceptable for Initial Test Programs...

  10. 49 CFR 219.607 - Railroad random alcohol testing programs.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION CONTROL OF ALCOHOL AND DRUG USE Random Alcohol and Drug Testing Programs § 219.607 Railroad random alcohol testing programs. (a) Each railroad must submit for FRA approval... 49 Transportation 4 2012-10-01 2012-10-01 false Railroad random alcohol testing programs. 219.607...

  11. 49 CFR 219.607 - Railroad random alcohol testing programs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION CONTROL OF ALCOHOL AND DRUG USE Random Alcohol and Drug Testing Programs § 219.607 Railroad random alcohol testing programs. (a) Each railroad must submit for FRA approval... 49 Transportation 4 2010-10-01 2010-10-01 false Railroad random alcohol testing programs. 219.607...

  12. 49 CFR 219.601 - Railroad random drug testing programs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Railroad random drug testing programs. 219.601... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION CONTROL OF ALCOHOL AND DRUG USE Random Alcohol and Drug Testing Programs § 219.601 Railroad random drug testing programs. (a) Submission. Each railroad must submit for FRA...

  13. 49 CFR 219.601 - Railroad random drug testing programs.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 4 2012-10-01 2012-10-01 false Railroad random drug testing programs. 219.601... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION CONTROL OF ALCOHOL AND DRUG USE Random Alcohol and Drug Testing Programs § 219.601 Railroad random drug testing programs. (a) Submission. Each railroad must submit for FRA...

  14. 49 CFR 219.607 - Railroad random alcohol testing programs.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION CONTROL OF ALCOHOL AND DRUG USE Random Alcohol and Drug Testing Programs § 219.607 Railroad random alcohol testing programs. (a) Each railroad must submit for FRA approval... 49 Transportation 4 2011-10-01 2011-10-01 false Railroad random alcohol testing programs. 219.607...

  15. 49 CFR 219.607 - Railroad random alcohol testing programs.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION CONTROL OF ALCOHOL AND DRUG USE Random Alcohol and Drug Testing Programs § 219.607 Railroad random alcohol testing programs. (a) Each railroad must submit for FRA approval... 49 Transportation 4 2013-10-01 2013-10-01 false Railroad random alcohol testing programs. 219.607...

  16. 49 CFR 219.601 - Railroad random drug testing programs.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 4 2014-10-01 2014-10-01 false Railroad random drug testing programs. 219.601... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION CONTROL OF ALCOHOL AND DRUG USE Random Alcohol and Drug Testing Programs § 219.601 Railroad random drug testing programs. (a) Submission. Each railroad must submit for FRA...

  17. 49 CFR 219.601 - Railroad random drug testing programs.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 4 2013-10-01 2013-10-01 false Railroad random drug testing programs. 219.601... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION CONTROL OF ALCOHOL AND DRUG USE Random Alcohol and Drug Testing Programs § 219.601 Railroad random drug testing programs. (a) Submission. Each railroad must submit for FRA...

  18. 49 CFR 219.601 - Railroad random drug testing programs.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Railroad random drug testing programs. 219.601... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION CONTROL OF ALCOHOL AND DRUG USE Random Alcohol and Drug Testing Programs § 219.601 Railroad random drug testing programs. (a) Submission. Each railroad must submit for FRA...

  19. 49 CFR 219.607 - Railroad random alcohol testing programs.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION CONTROL OF ALCOHOL AND DRUG USE Random Alcohol and Drug Testing Programs § 219.607 Railroad random alcohol testing programs. (a) Each railroad must submit for FRA approval... 49 Transportation 4 2014-10-01 2014-10-01 false Railroad random alcohol testing programs. 219.607...

  20. Hardware test program for evaluation of baseline range/range rate sensor concept

    NASA Technical Reports Server (NTRS)

    Pernic, E.

    1985-01-01

    The test program Phase II effort provides additional design information in terms of range and range rate (R/R) sensor performance when observing and tracking a typical spacecraft target. The target used in the test program was a one-third scale model of the Hubble Space Telescope (HST) available at the MSFC test site where the tests were performed. A modified Bendix millimeter wave radar served as the R/R sensor test bed for evaluation of range and range rate tracking performance, and generation of radar signature characteristics of the spacecraft target. A summary of program test results and conclusions are presented along with detailed description of the Bendix test bed radar with accompaning instrumentation. The MSFC test site and facilities are described. The test procedures used to establish background levels, and the calibration procedures used in the range accuracy tests and RCS (radar cross section) signature measurements, are presented and a condensed version of the daily log kept during the 5 September through 17 September test period is also presented. The test program results are given starting with the RCS signature measurements, then continuing with range measurement accuracy test results and finally the range and range rate tracking accuracy test results.

  1. MBTA Green Line Tests - Riverside Line, December 1972 : Volume 1. Description.

    DOT National Transportation Integrated Search

    1973-09-01

    The Urban Rail Supporting Technology Program emphasizes three major task areas; facilities development, technology development, and test program development. The test program development is composed of three sub-areas; vehicle testing, ways and struc...

  2. CMIF ECLS system test findings

    NASA Technical Reports Server (NTRS)

    Schunk, Richard G.; Carrasquillo, Robyn L.; Ogle, Kathyrn Y.; Wieland, Paul O.; Bagdigian, Robert M.

    1989-01-01

    During 1987 three Space Station integrated Environmental Control and Life Support System (ECLSS) tests were conducted at the Marshall Space Flight Center (MSFC) Core Module Integration Facility (CMIF) as part of the MSFC ECLSS Phase II test program. The three tests ranged in duration from 50 to 150 hours and were conducted inside of the CMIF module simulator. The Phase II partial integrated system test configuration consisted of four regenerative air revitalization subsystems and one regenerative water reclamation subsystem. This paper contains a discussion of results and lessons learned from the Phase II test program. The design of the Phase II test configuration and improvements made throughout the program are detailed. Future plans for the MSFC CMIF test program are provided, including an overview of planned improvements for the Phase III program.

  3. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chace, D.A.; Roberts, R.M.; Palmer, J.B.

    WIPP Salado Hydrology Program Data Report {number_sign}3 presents hydrologic data collected during permeability testing, coupled permeability and hydrofracture testing, and gas-threshold-pressure testing of the Salado Formation performed from November 1991 through October 1995. Fluid-pressure monitoring data representing August 1989 through May 1995 are also included. The report presents data from the drilling and testing of three boreholes associated with the permeability testing program, nine boreholes associated with the coupled permeability and hydrofracture testing program, and three boreholes associated with the gas-threshold-pressure testing program. The purpose of the permeability testing program was to provide data with which to interpret the disturbedmore » and undisturbed permeability and pore pressure characteristics of the different Salado Formation lithologies. The purpose of the coupled permeability and hydrofracture testing program was to provide data with which to characterize the occurrence, propagation, and direction of pressure induced fractures in the Salado Formation lithologies, especially MB139. The purpose of the gas-threshold-pressure testing program was to provide data with which to characterize the conditions under which pressurized gas displaces fluid in the brine-saturated Salado Formation lithologies. All of the holes were drilled from the WIPP underground facility 655 m below ground surface in the Salado Formation.« less

  4. Space Shuttle wind tunnel testing program

    NASA Technical Reports Server (NTRS)

    Whitnah, A. M.; Hillje, E. R.

    1984-01-01

    A major phase of the Space Shuttle Vehicle (SSV) Development Program was the acquisition of data through the space shuttle wind tunnel testing program. It became obvious that the large number of configuration/environment combinations would necessitate an extremely large wind tunnel testing program. To make the most efficient use of available test facilities and to assist the prime contractor for orbiter design and space shuttle vehicle integration, a unique management plan was devised for the design and development phase. The space shuttle program is reviewed together with the evolutional development of the shuttle configuration. The wind tunnel testing rationale and the associated test program management plan and its overall results is reviewed. Information is given for the various facilities and models used within this program. A unique posttest documentation procedure and a summary of the types of test per disciplines, per facility, and per model are presented with detailed listing of the posttest documentation.

  5. 77 FR 28601 - Announcement of an Opportunity for Manufacturers and Designers of Closed Circuit Escape...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-15

    ... Correlation Test Program are not applicable as pre-test data for a respirator approval application. DATES: The... Performance Testing Within a Correlation Test Program Offered by the National Institute for Occupational...: Notice. SUMMARY: The purpose of this notice is to announce a Correlation Test Program offered by NIOSH...

  6. 78 FR 75931 - National Customs Automation Program (NCAP) Test Concerning the Submission of Certain Data...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-13

    ... provide the Commissioner of CBP with authority to conduct limited test programs or procedures designed to... on all aspects of this test, including the design, conduct and implementation of the test, in order... Program (NCAP) Test Concerning the Submission of Certain Data Required by the Environmental Protection...

  7. MBTA Green Line Tests - Riverside Line, December 1972 : Volume 5. Gage Computer Printout.

    DOT National Transportation Integrated Search

    1973-01-01

    The Urban Rail Supporting Technology Program emphasizes three major task areas; facilities development, technology development, and test program development. The test program development is composed of three sub-areas; vehicle testing, ways and struc...

  8. MBTA Green Line Tests - Riverside Line, December 1972 : Volume 4. Westbound Track Profile.

    DOT National Transportation Integrated Search

    1973-01-01

    The Urban Rail Supporting Technology Program emphasizes three major task areas; facilities development, technology development, and test program development. The test program development is composed of three sub-areas; vehicle testing, ways and struc...

  9. MBTA Green Line Tests - Riverside Line, December 1972 : Volume 3. Eastbound Track Profile.

    DOT National Transportation Integrated Search

    1973-01-01

    The Urban Rail Supporting Technology Program emphasizes three major task areas; facilities development, technology development, and test program development. The test program development is composed of three sub-areas; vehicle testing, ways and struc...

  10. 49 CFR 40.123 - What are the MRO's responsibilities in the DOT drug testing program?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... drug testing program? 40.123 Section 40.123 Transportation Office of the Secretary of Transportation PROCEDURES FOR TRANSPORTATION WORKPLACE DRUG AND ALCOHOL TESTING PROGRAMS Medical Review Officers and the Verification Process § 40.123 What are the MRO's responsibilities in the DOT drug testing program? As an MRO...

  11. 49 CFR 40.123 - What are the MRO's responsibilities in the DOT drug testing program?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... drug testing program? 40.123 Section 40.123 Transportation Office of the Secretary of Transportation PROCEDURES FOR TRANSPORTATION WORKPLACE DRUG AND ALCOHOL TESTING PROGRAMS Medical Review Officers and the Verification Process § 40.123 What are the MRO's responsibilities in the DOT drug testing program? As an MRO...

  12. 49 CFR 40.123 - What are the MRO's responsibilities in the DOT drug testing program?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... drug testing program? 40.123 Section 40.123 Transportation Office of the Secretary of Transportation PROCEDURES FOR TRANSPORTATION WORKPLACE DRUG AND ALCOHOL TESTING PROGRAMS Medical Review Officers and the Verification Process § 40.123 What are the MRO's responsibilities in the DOT drug testing program? As an MRO...

  13. 49 CFR 40.123 - What are the MRO's responsibilities in the DOT drug testing program?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... drug testing program? 40.123 Section 40.123 Transportation Office of the Secretary of Transportation PROCEDURES FOR TRANSPORTATION WORKPLACE DRUG AND ALCOHOL TESTING PROGRAMS Medical Review Officers and the Verification Process § 40.123 What are the MRO's responsibilities in the DOT drug testing program? As an MRO...

  14. 49 CFR 40.123 - What are the MRO's responsibilities in the DOT drug testing program?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... drug testing program? 40.123 Section 40.123 Transportation Office of the Secretary of Transportation PROCEDURES FOR TRANSPORTATION WORKPLACE DRUG AND ALCOHOL TESTING PROGRAMS Medical Review Officers and the Verification Process § 40.123 What are the MRO's responsibilities in the DOT drug testing program? As an MRO...

  15. Spillover effects of HIV testing policies: changes in HIV testing guidelines and HCV testing practices in drug treatment programs in the United States.

    PubMed

    Frimpong, Jemima A; D'Aunno, Thomas; Helleringer, Stéphane; Metsch, Lisa R

    2016-07-29

    To examine the extent to which state adoption of the Centers for Disease Control and Prevention (CDC) 2006 revisions to adult and adolescent HIV testing guidelines is associated with availability of other important prevention and medical services. We hypothesized that in states where the pretest counseling requirement for HIV testing was dropped from state legislation, substance use disorder treatment programs would have higher availability of HCV testing services than in states that had maintained this requirement. We analyzed a nationally representative sample of 383 opioid treatment programs from the 2005 and 2011 National Drug Abuse Treatment System Survey (NDATSS). Data were collected from program directors and clinical supervisors through telephone surveys. Multivariate logistic regression models were used to measure associations between state adoption of CDC recommended guidelines for HIV pretest counseling and availability of HCV testing services. The effects of HIV testing legislative changes on HCV testing practices varied by type of opioid treatment program. In states that had removed the requirement for HIV pretest counseling, buprenorphine-only programs were more likely to offer HCV testing to their patients. The positive spillover effect of HIV pretest counseling policies, however, did not extend to methadone programs and did not translate into increased availability of on-site HCV testing in either program type. Our findings highlight potential positive spillover effects of HIV testing policies on HCV testing practices. They also suggest that maximizing the benefits of HIV policies may require other initiatives, including resources and programmatic efforts that support systematic integration with other services and effective implementation.

  16. ITOS meteorological satellite system: TIROS M spacecraft (ITOS 1), volume 3

    NASA Technical Reports Server (NTRS)

    1970-01-01

    The test programs for TIROS M are reported. Test histories reported include: mechanical test models, thermal test models, antenna test models, ETM test program, and flight acceptance. Prelaunch activities and ground station equipment are described.

  17. Designing an HIV counseling and testing program for bathhouses: the Seattle experience with strategies to improve acceptability.

    PubMed

    Spielberg, Freya; Branson, Bernard M; Goldbaum, Gary M; Kurth, Ann; Wood, Robert W

    2003-01-01

    Bathhouses are important venues for providing HIV counseling and testing to high-risk men who have sex with men (MSM), yet relatively few bathhouses routinely provide this service, and few data are available to guide program design. We examine numerous logistic considerations that had been identified in the HIV Alternative Testing Strategies study and that influenced the initiation, effectiveness, and maintenance of HIV testing programs in bathhouses for MSM. Key programmatic considerations in the design of a bathhouse HIV counseling and testing program included building alliances with community agencies, hiring and training staff, developing techniques for offering testing, and providing options for counseling, testing, and disclosure of results. The design included ways to provide client support and follow-up for partner notification and treatment counseling and to maintain relationships with bathhouse management for support of prevention activities. Early detection of HIV infection and HIV prevention can be achieved for some high-risk MSM through an accessible and acceptable HIV counseling and testing program in bathhouses. Keys to success include establishing community prevention collaborations between bathhouse personnel and testing agencies, ensuring that testing staff are supported in their work, and offering anonymous rapid HIV testing. Use of FDA approved, new rapid tests that do not require venipuncture, centrifugation, or laboratory oversight will further decrease barriers to testing and facilitate implementation of bathhouse testing programs in other communities.

  18. Test blueprints for psychiatry residency in-training written examinations in Riyadh, Saudi Arabia

    PubMed Central

    Gaffas, Eisha M; Sequeira, Reginald P; Namla, Riyadh A Al; Al-Harbi, Khalid S

    2012-01-01

    Background The postgraduate training program in psychiatry in Saudi Arabia, which was established in 1997, is a 4-year residency program. Written exams comprising of multiple choice questions (MCQs) are used as a summative assessment of residents in order to determine their eligibility for promotion from one year to the next. Test blueprints are not used in preparing examinations. Objective To develop test blueprints for the written examinations used in the psychiatry residency program. Methods Based on the guidelines of four professional bodies, documentary analysis was used to develop global and detailed test blueprints for each year of the residency program. An expert panel participated during piloting and final modification of the test blueprints. Their opinion about the content, weightage for each content domain, and proportion of test items to be sampled in each cognitive category as defined by modified Bloom’s taxonomy were elicited. Results Eight global and detailed test blueprints, two for each year of the psychiatry residency program, were developed. The global test blueprints were reviewed by experts and piloted. Six experts participated in the final modification of test blueprints. Based on expert consensus, the content, total weightage for each content domain, and proportion of test items to be included in each cognitive category were determined for each global test blueprint. Experts also suggested progressively decreasing the weightage for recall test items and increasing problem solving test items in examinations, from year 1 to year 4 of the psychiatry residence program. Conclusion A systematic approach using a documentary and content analysis technique was used to develop test blueprints with additional input from an expert panel as appropriate. Test blueprinting is an important step to ensure the test validity in all residency programs. PMID:23762000

  19. Test blueprints for psychiatry residency in-training written examinations in Riyadh, Saudi Arabia.

    PubMed

    Gaffas, Eisha M; Sequeira, Reginald P; Namla, Riyadh A Al; Al-Harbi, Khalid S

    2012-01-01

    The postgraduate training program in psychiatry in Saudi Arabia, which was established in 1997, is a 4-year residency program. Written exams comprising of multiple choice questions (MCQs) are used as a summative assessment of residents in order to determine their eligibility for promotion from one year to the next. Test blueprints are not used in preparing examinations. To develop test blueprints for the written examinations used in the psychiatry residency program. Based on the guidelines of four professional bodies, documentary analysis was used to develop global and detailed test blueprints for each year of the residency program. An expert panel participated during piloting and final modification of the test blueprints. Their opinion about the content, weightage for each content domain, and proportion of test items to be sampled in each cognitive category as defined by modified Bloom's taxonomy were elicited. Eight global and detailed test blueprints, two for each year of the psychiatry residency program, were developed. The global test blueprints were reviewed by experts and piloted. Six experts participated in the final modification of test blueprints. Based on expert consensus, the content, total weightage for each content domain, and proportion of test items to be included in each cognitive category were determined for each global test blueprint. Experts also suggested progressively decreasing the weightage for recall test items and increasing problem solving test items in examinations, from year 1 to year 4 of the psychiatry residence program. A systematic approach using a documentary and content analysis technique was used to develop test blueprints with additional input from an expert panel as appropriate. Test blueprinting is an important step to ensure the test validity in all residency programs.

  20. MBTA Green Line Tests - Riverside Line, December 1972 : Volume 2. Track Geometry Data Plots.

    DOT National Transportation Integrated Search

    1973-09-01

    The Urban Rail Supporting Technology Program emphasizes three major task areas; facilities development, technology development, and test program development. The test program development is composed of three sub-areas; vehicle testing, ways and struc...

  1. Forward Skirt Structural Testing on the Space Launch System (SLS) Program

    NASA Technical Reports Server (NTRS)

    Lohrer, J. D.; Wright, R. D.

    2016-01-01

    Structural testing was performed to evaluate heritage forward skirts from the Space Shuttle program for use on the NASA Space Launch System (SLS) program. Testing was needed because SLS ascent loads are 35% higher than Space Shuttle loads. Objectives of testing were to determine margins of safety, demonstrate reliability, and validate analytical models. Testing combined with analysis was able to show heritage forward skirts were acceptable to use on the SLS program.

  2. Iterative evaluation in a mobile counseling and testing program to reach people of color at risk for HIV--new strategies improve program acceptability, effectiveness, and evaluation capabilities.

    PubMed

    Spielberg, Freya; Kurth, Ann; Reidy, William; McKnight, Teka; Dikobe, Wame; Wilson, Charles

    2011-06-01

    This article highlights findings from an evaluation that explored the impact of mobile versus clinic-based testing, rapid versus central-lab based testing, incentives for testing, and the use of a computer counseling program to guide counseling and automate evaluation in a mobile program reaching people of color at risk for HIV. The program's results show that an increased focus on mobile outreach using rapid testing, incentives and health information technology tools may improve program acceptability, quality, productivity and timeliness of reports. This article describes program design decisions based on continuous quality assessment efforts. It also examines the impact of the Computer Assessment and Risk Reduction Education computer tool on HIV testing rates, staff perception of counseling quality, program productivity, and on the timeliness of evaluation reports. The article concludes with a discussion of implications for programmatic responses to the Centers for Disease Control and Prevention's HIV testing recommendations.

  3. Voyager electronic parts radiation program. Volume 2: Test requirements and procedures

    NASA Technical Reports Server (NTRS)

    Stanley, A. G.; Martin, K. E.; Price, W. E.

    1978-01-01

    Documents are presented outlining the conditions and requirements of the test program. The Appendixes are as follows: appendix A -- Electron Simulation Radiation Test Specification for Voyager Electronic Parts and Devices, appendix B -- Electronic Piece-Part Testing Program for Voyager, appendix C -- Test Procedure for Radiation Screening of Voyager Piece Parts, appendix D -- Boeing In Situ Test Fixture, and appendix E -- Irradiate - Anneal (IRAN) Screening Documents.

  4. 14 CFR 120.113 - Medical Review Officer, Substance Abuse Professional, and Employer Responsibilities.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ...: CERTIFICATION AND OPERATIONS DRUG AND ALCOHOL TESTING PROGRAM Drug Testing Program Requirements § 120.113... provision of MRO services as part of its drug testing program. (b) Medical Review Officer (MRO). The MRO... working days after verifying a positive drug test result or refusal to submit to a test. (2) During the...

  5. 14 CFR 120.113 - Medical Review Officer, Substance Abuse Professional, and Employer Responsibilities.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ...: CERTIFICATION AND OPERATIONS DRUG AND ALCOHOL TESTING PROGRAM Drug Testing Program Requirements § 120.113... provision of MRO services as part of its drug testing program. (b) Medical Review Officer (MRO). The MRO... working days after verifying a positive drug test result or refusal to submit to a test. (2) During the...

  6. 76 FR 59574 - Procedures for Transportation Workplace Drug and Alcohol Testing Programs: Federal Drug Testing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-27

    ... 2105-AE13 Procedures for Transportation Workplace Drug and Alcohol Testing Programs: Federal Drug...) published an interim final rule (IFR) authorizing the use of a new Federal Drug Testing Custody and Control Form (CCF) in its drug testing program. Use of the form is authorized beginning October 1, 2010. This...

  7. 14 CFR 120.113 - Medical Review Officer, Substance Abuse Professional, and Employer Responsibilities.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ...: CERTIFICATION AND OPERATIONS DRUG AND ALCOHOL TESTING PROGRAM Drug Testing Program Requirements § 120.113... provision of MRO services as part of its drug testing program. (b) Medical Review Officer (MRO). The MRO... working days after verifying a positive drug test result or refusal to submit to a test. (2) During the...

  8. 41 CFR 300-90.1 - What is a telework travel expenses test program?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 41 Public Contracts and Property Management 4 2014-07-01 2014-07-01 false What is a telework... Travel Regulation System GENERAL AGENCY REQUIREMENTS 90-TELEWORK TRAVEL EXPENSES TEST PROGRAMS § 300-90.1 What is a telework travel expenses test program? It is a program that permits an agency to test new and...

  9. 41 CFR 300-90.9 - What reports are required for a test program?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... required for a test program? 300-90.9 Section 300-90.9 Public Contracts and Property Management Federal Travel Regulation System GENERAL AGENCY REQUIREMENTS 90-TELEWORK TRAVEL EXPENSES TEST PROGRAMS § 300-90.9 What reports are required for a test program? (a) The Administrator of General Services must submit to...

  10. 14 CFR 120.215 - Covered employees.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... AND OPERATORS FOR COMPENSATION OR HIRE: CERTIFICATION AND OPERATIONS DRUG AND ALCOHOL TESTING PROGRAM Alcohol Testing Program Requirements § 120.215 Covered employees. (a) Each employee, including any... in this subpart must be subject to alcohol testing under an alcohol testing program implemented in...

  11. 14 CFR 120.215 - Covered employees.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... AND OPERATORS FOR COMPENSATION OR HIRE: CERTIFICATION AND OPERATIONS DRUG AND ALCOHOL TESTING PROGRAM Alcohol Testing Program Requirements § 120.215 Covered employees. (a) Each employee, including any... in this subpart must be subject to alcohol testing under an alcohol testing program implemented in...

  12. 14 CFR 120.215 - Covered employees.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... AND OPERATORS FOR COMPENSATION OR HIRE: CERTIFICATION AND OPERATIONS DRUG AND ALCOHOL TESTING PROGRAM Alcohol Testing Program Requirements § 120.215 Covered employees. (a) Each employee, including any... in this subpart must be subject to alcohol testing under an alcohol testing program implemented in...

  13. History and Benefits of Engine Level Testing Throughout the Space Shuttle Main Engine Program

    NASA Technical Reports Server (NTRS)

    VanHooser, Katherine; Kan, Kenneth; Maddux, Lewis; Runkle, Everett

    2010-01-01

    Rocket engine testing is important throughout a program s life and is essential to the overall success of the program. Space Shuttle Main Engine (SSME) testing can be divided into three phases: development, certification, and operational. Development tests are conducted on the basic design and are used to develop safe start and shutdown transients and to demonstrate mainstage operation. This phase helps form the foundation of the program, demands navigation of a very steep learning curve, and yields results that shape the final engine design. Certification testing involves multiple engine samples and more aggressive test profiles that explore the boundaries of the engine to vehicle interface requirements. The hardware being tested may have evolved slightly from that in the development phase. Operational testing is conducted with mature hardware and includes acceptance testing of flight assets, resolving anomalies that occur in flight, continuing to expand the performance envelope, and implementing design upgrades. This paper will examine these phases of testing and their importance to the SSME program. Examples of tests conducted in each phase will also be presented.

  14. 14 CFR 120.115 - Employee Assistance Program (EAP).

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... (CONTINUED) AIR CARRIERS AND OPERATORS FOR COMPENSATION OR HIRE: CERTIFICATION AND OPERATIONS DRUG AND ALCOHOL TESTING PROGRAM Drug Testing Program Requirements § 120.115 Employee Assistance Program (EAP). (a... the employee and supervisor EAP training in the employer's drug testing program. [Doc. No. FAA-2008...

  15. Evaluation of a Secure Laptop-Based Testing Program in an Undergraduate Nursing Program: Students' Perspective.

    PubMed

    Tao, Jinyuan; Gunter, Glenda; Tsai, Ming-Hsiu; Lim, Dan

    2016-01-01

    Recently, the many robust learning management systems, and the availability of affordable laptops, have made secure laptop-based testing a reality on many campuses. The undergraduate nursing program at the authors' university began to implement a secure laptop-based testing program in 2009, which allowed students to use their newly purchased laptops to take quizzes and tests securely in classrooms. After nearly 5 years' secure laptop-based testing program implementation, a formative evaluation, using a mixed method that has both descriptive and correlational data elements, was conducted to seek constructive feedback from students to improve the program. Evaluation data show that, overall, students (n = 166) believed the secure laptop-based testing program helps them get hands-on experience of taking examinations on the computer and gets them prepared for their computerized NCLEX-RN. Students, however, had a lot of concerns about laptop glitches and campus wireless network glitches they experienced during testing. At the same time, NCLEX-RN first-time passing rate data were analyzed using the χ2 test, and revealed no significant association between the two testing methods (paper-and-pencil testing and the secure laptop-based testing) and students' first-time NCLEX-RN passing rate. Based on the odds ratio, however, the odds of students passing NCLEX-RN the first time was 1.37 times higher if they were taught with the secure laptop-based testing method than if taught with the traditional paper-and-pencil testing method in nursing school. It was recommended to the institution that better quality of laptops needs to be provided to future students, measures needed to be taken to further stabilize the campus wireless Internet network, and there was a need to reevaluate the Laptop Initiative Program.

  16. Test-driven programming

    NASA Astrophysics Data System (ADS)

    Georgiev, Bozhidar; Georgieva, Adriana

    2013-12-01

    In this paper, are presented some possibilities concerning the implementation of a test-driven development as a programming method. Here is offered a different point of view for creation of advanced programming techniques (build tests before programming source with all necessary software tools and modules respectively). Therefore, this nontraditional approach for easier programmer's work through building tests at first is preferable way of software development. This approach allows comparatively simple programming (applied with different object-oriented programming languages as for example JAVA, XML, PYTHON etc.). It is predictable way to develop software tools and to provide help about creating better software that is also easier to maintain. Test-driven programming is able to replace more complicated casual paradigms, used by many programmers.

  17. 78 FR 68360 - Unmanned Aircraft System Test Site Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-14

    ...-0061] Unmanned Aircraft System Test Site Program AGENCY: Federal Aviation Administration (FAA), DOT...'') test site program; response to comments. SUMMARY: On February 22, 2013 the FAA published and requested public comment on the proposed privacy requirements (the ``Draft Privacy Requirements'') for UAS test...

  18. 14 CFR 120.119 - Annual reports.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AND OPERATORS FOR COMPENSATION OR HIRE: CERTIFICATION AND OPERATIONS DRUG AND ALCOHOL TESTING PROGRAM Drug Testing Program Requirements § 120.119 Annual reports. (a) Annual reports of testing results must... holder shall submit an annual report each year. (2) Each entity conducting a drug testing program under...

  19. 14 CFR 120.119 - Annual reports.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AND OPERATORS FOR COMPENSATION OR HIRE: CERTIFICATION AND OPERATIONS DRUG AND ALCOHOL TESTING PROGRAM Drug Testing Program Requirements § 120.119 Annual reports. (a) Annual reports of testing results must... holder shall submit an annual report each year. (2) Each entity conducting a drug testing program under...

  20. 14 CFR 120.119 - Annual reports.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... AND OPERATORS FOR COMPENSATION OR HIRE: CERTIFICATION AND OPERATIONS DRUG AND ALCOHOL TESTING PROGRAM Drug Testing Program Requirements § 120.119 Annual reports. (a) Annual reports of testing results must... holder shall submit an annual report each year. (2) Each entity conducting a drug testing program under...

  1. 14 CFR 120.119 - Annual reports.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... AND OPERATORS FOR COMPENSATION OR HIRE: CERTIFICATION AND OPERATIONS DRUG AND ALCOHOL TESTING PROGRAM Drug Testing Program Requirements § 120.119 Annual reports. (a) Annual reports of testing results must... holder shall submit an annual report each year. (2) Each entity conducting a drug testing program under...

  2. 14 CFR 120.119 - Annual reports.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... AND OPERATORS FOR COMPENSATION OR HIRE: CERTIFICATION AND OPERATIONS DRUG AND ALCOHOL TESTING PROGRAM Drug Testing Program Requirements § 120.119 Annual reports. (a) Annual reports of testing results must... holder shall submit an annual report each year. (2) Each entity conducting a drug testing program under...

  3. 40 CFR 136.5 - Approval of alternate test procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... and to the Alternate Test Procedure Program Coordinator, Office of Science and Technology (4303... to the Alternate Test Procedure Program Coordinator, Office of Science and Technology (4303), Office... will be forwarded to the Alternate Test Procedure Program Coordinator, Office of Science and Technology...

  4. 40 CFR 136.5 - Approval of alternate test procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... and to the Alternate Test Procedure Program Coordinator, Office of Science and Technology (4303... to the Alternate Test Procedure Program Coordinator, Office of Science and Technology (4303), Office... will be forwarded to the Alternate Test Procedure Program Coordinator, Office of Science and Technology...

  5. FETC/EPRI Biomass Cofiring Cooperative Agreement. Quarterly technical report, April 1-June 30, 1997

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hughes, E.; Tillman, D.

    1997-12-01

    The FETC/EPRI Biomass Cofiring Program has accelerated the pace of cofiring development by increasing the testing activities plus the support activities for interpreting test results. Past tests conducted and analyzed include the Allen Fossil Plant and Seward Generating Station programs. On-going tests include the Colbert Fossil Plant precommercial test program, the Greenidge Station commercialization program, and the Blount St. Station switchgrass program. Tests in the formative stages included the NIPSCO cofiring test at Michigan City Generating Station. Analytical activities included modeling and related support functions required to analyze the cofiring test results, and to place those results into context. Amongmore » these activities is the fuel availability study in the Pittsburgh, PA area. This study, conducted for Duquesne Light, supports their initial investigation into reburn technology using wood waste as a fuel. This Quarterly Report, covering the third quarter of the FETC/EPRI Biomass Cofiring Program, highlights the progress made on the 16 projects funded under this cooperative agreement.« less

  6. High Alpha Technology Program (HATP) ground test to flight comparisons

    NASA Technical Reports Server (NTRS)

    Hall, R. M.; Banks, D. W.; Fisher, David F.; Ghaffari, F.; Murri, D. G.; Ross, J. C.; Lanser, Wendy R.

    1994-01-01

    This status paper reviews the experimental ground test program of the High Alpha Technology Program (HATP). The reasons for conducting this ground test program had their origins during the 1970's when several difficulties were experienced during the development programs of both the F-18 and F-16. A careful assessment of ground test to flight correlations appeared to be important for reestablishing a high degree of confidence in our ground test methodology. The current paper will then focus on one aspect of the HATP program that is intended to improve the correlation between ground test and flight, high-alpha gritting. The importance of this work arises from the sensitivity of configurations with smooth-sided forebodies to Reynolds number. After giving examples of the effects of Reynolds number, the paper will highlight efforts at forebody gritting. Finally, the paper will conclude by summarizing the charter of the HATP Experimental Aerodynamics Working Group and future experimental testing plans.

  7. SRB Environment Evaluation and Analysis. Volume 2: RSRB Joint Filling Test/Analysis Improvements

    NASA Technical Reports Server (NTRS)

    Knox, E. C.; Woods, G. Hamilton

    1991-01-01

    Following the Challenger accident a very comprehensive solid rocket booster (SRB) redesign program was initiated. One objective of the program was to develop expertise at NASA/MSFC in the techniques for analyzing the flow of hot gases in the SRB joints. Several test programs were undertaken to provide a data base of joint performance with manufactured defects in the joints to allow hot gases to fill the joints. This data base was used also to develop the analytical techniques. Some of the test programs were Joint Environment Simulator (JES), Nozzle Joint Environment Simulator (NJES), Transient Pressure Test Article (TPTA), and Seventy-Pound Charge (SPC). In 1988 the TPTA test hardware was moved from the Utah site to MSFC and several RSRM tests were scheduled, to be followed by tests for the ASRM program. REMTECH Inc. supported these activities with pretest estimates of the flow conditions in the test joints, and post-test analysis and evaluation of the measurements. During this support REMTECH identified deficiencies in the gas-measurement instrumentation that existed in the TPTA hardware, made recommendations for its replacement, and identified improvements to the analytical tools used in the test support. Only one test was completed under the TPTA RSRM test program, and those scheduled for the ASRM were rescheduled to a time after the expiration of this contract. The attention of this effort was directed toward improvements in the analytical techniques in preparation for when the ASRM program begins.

  8. Investigation of medium and high temperature phase change materials

    NASA Technical Reports Server (NTRS)

    Heine, D.; Kraehling, H.

    1979-01-01

    A detailed description of the programs for acquisition and analysis of the test results is given. Basically it concerns three programs. The TEST program controls the recording of the test data. With the THELLI program it is possible to follow the temperature curve recorded for each individual thermoelement during the test. With the AUSW program the test data can be analyzed, to determine, for example, the melting point and the start of melting. The first results of the service life tests are discussed. From these it is attempted to draw inferences for the subsequent tests. An attempt is made to focus on the determination of the area-related mass loss, the reduction in thickness and the corrosion rate as well as optical and scanning electron microscope evaluation.

  9. Implementation of a computer database testing and analysis program.

    PubMed

    Rouse, Deborah P

    2007-01-01

    The author is the coordinator of a computer software database testing and analysis program implemented in an associate degree nursing program. Computer software database programs help support the testing development and analysis process. Critical thinking is measurable and promoted with their use. The reader of this article will learn what is involved in procuring and implementing a computer database testing and analysis program in an academic nursing program. The use of the computerized database for testing and analysis will be approached as a method to promote and evaluate the nursing student's critical thinking skills and to prepare the nursing student for the National Council Licensure Examination.

  10. A Technological and Historical Consideration of Equity Issues Associated with Proposals to Change the Nation's Testing Policy.

    ERIC Educational Resources Information Center

    Madaus, George F.

    1994-01-01

    Historically, such testing programs as intelligence tests and Chapter I minimum competency testing have inadvertently perpetuated inequalities. An equitable national testing program must look beyond the mystique of testing technologies, clearly define purposes of assessment, recruit minorities into the testing field, and establish an independent…

  11. 14 CFR 120.115 - Employee Assistance Program (EAP).

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... (CONTINUED) AIR CARRIERS AND OPERATORS FOR COMPENSATION OR HIRE: CERTIFICATION AND OPERATIONS DRUG AND ALCOHOL TESTING PROGRAM Drug Testing Program Requirements § 120.115 Employee Assistance Program (EAP). (a... employer's drug testing plan submitted to the FAA for approval. ...

  12. 14 CFR 120.115 - Employee Assistance Program (EAP).

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... (CONTINUED) AIR CARRIERS AND OPERATORS FOR COMPENSATION OR HIRE: CERTIFICATION AND OPERATIONS DRUG AND ALCOHOL TESTING PROGRAM Drug Testing Program Requirements § 120.115 Employee Assistance Program (EAP). (a... employer's drug testing plan submitted to the FAA for approval. ...

  13. 14 CFR 120.115 - Employee Assistance Program (EAP).

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... (CONTINUED) AIR CARRIERS AND OPERATORS FOR COMPENSATION OR HIRE: CERTIFICATION AND OPERATIONS DRUG AND ALCOHOL TESTING PROGRAM Drug Testing Program Requirements § 120.115 Employee Assistance Program (EAP). (a... employer's drug testing plan submitted to the FAA for approval. ...

  14. 14 CFR 120.115 - Employee Assistance Program (EAP).

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... (CONTINUED) AIR CARRIERS AND OPERATORS FOR COMPENSATION OR HIRE: CERTIFICATION AND OPERATIONS DRUG AND ALCOHOL TESTING PROGRAM Drug Testing Program Requirements § 120.115 Employee Assistance Program (EAP). (a... employer's drug testing plan submitted to the FAA for approval. ...

  15. ITERATIVE EVALUATION IN A MOBILE COUNSELING AND TESTING PROGRAM TO REACH PEOPLE OF COLOR AT RISK FOR HIV—NEW STRATEGIES IMPROVE PROGRAM ACCEPTABILITY, EFFECTIVENESS, AND EVALUATION CAPABILITIES

    PubMed Central

    Spielberg, Freya; Kurth, Ann; Reidy, William; McKnight, Teka; Dikobe, Wame; Wilson, Charles

    2016-01-01

    This article highlights findings from an evaluation that explored the impact of mobile versus clinic-based testing, rapid versus central-lab based testing, incentives for testing, and the use of a computer counseling program to guide counseling and automate evaluation in a mobile program reaching people of color at risk for HIV. The program’s results show that an increased focus on mobile outreach using rapid testing, incentives and health information technology tools may improve program acceptability, quality, productivity and timeliness of reports. This article describes program design decisions based on continuous quality assessment efforts. It also examines the impact of the Computer Assessment and Risk Reduction Education computer tool on HIV testing rates, staff perception of counseling quality, program productivity, and on the timeliness of evaluation reports. The article concludes with a discussion of implications for programmatic responses to the Centers for Disease Control and Prevention’s HIV testing recommendations. PMID:21689041

  16. Iterative Evaluation in a Mobile Counseling and Testing Program to Reach People of Color at Risk for HIV--New Strategies Improve Program Acceptability, Effectiveness, and Evaluation Capabilities

    ERIC Educational Resources Information Center

    Spielberg, Freya; Kurth, Ann; Reidy, William; McKnight, Teka; Dikobe, Wame; Wilson, Charles

    2011-01-01

    This article highlights findings from an evaluation that explored the impact of mobile versus clinic-based testing, rapid versus central-lab based testing, incentives for testing, and the use of a computer counseling program to guide counseling and automate evaluation in a mobile program reaching people of color at risk for HIV. The program's…

  17. 19 CFR 101.9 - Test programs or procedures; alternate requirements.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... test and the basis for selecting participants; and, (2) Post publication requirement. Within a... 19 Customs Duties 1 2014-04-01 2014-04-01 false Test programs or procedures; alternate... SECURITY; DEPARTMENT OF THE TREASURY GENERAL PROVISIONS § 101.9 Test programs or procedures; alternate...

  18. 78 FR 49607 - Energy Conservation Program: Test Procedures for Residential Clothes Dryers

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-14

    ... reasonably designed to produce test results which measure energy efficiency, energy use or estimated annual... Energy Conservation Program: Test Procedures for Residential Clothes Dryers; Final Rule #0;#0;Federal... Conservation Program: Test Procedures for Residential Clothes Dryers AGENCY: Office of Energy Efficiency and...

  19. 77 FR 13887 - Energy Conservation Program: Test Procedures for Residential Clothes Washers

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-07

    ... Energy Conservation Program: Test Procedures for Residential Clothes Washers; Final Rule #0;#0;Federal... Conservation Program: Test Procedures for Residential Clothes Washers AGENCY: Office of Energy Efficiency and...) establishes new test procedures for residential clothes washers under the Energy Policy and Conservation Act...

  20. The NASA modern technology rotors program

    NASA Technical Reports Server (NTRS)

    Watts, M. E.; Cross, J. L.

    1986-01-01

    Existing data bases regarding helicopters are based on work conducted on 'old-technology' rotor systems. The Modern Technology Rotors (MTR) Program is to provide extensive data bases on rotor systems using present and emerging technology. The MTR is concerned with modern, four-bladed, rotor systems presently being manufactured or under development. Aspects of MTR philosophy are considered along with instrumentation, the MTR test program, the BV 360 Rotor, and the UH-60 Black Hawk. The program phases include computer modelling, shake test, model-scale test, minimally instrumented flight test, extensively pressure-instrumented-blade flight test, and full-scale wind tunnel test.

  1. Dimensions and Characteristics of Personnel Manager Perceptions of Effective Drug-Testing Programs.

    ERIC Educational Resources Information Center

    Gomez-Mejia, Luis R.; Balkin, David B.

    1987-01-01

    Examined characteristics of drug-testing programs that were associated with personnel managers' judgments of the programs' effectiveness using data gathered from human resource managers (N=190). Results showed drug-testing programs considered to be effective were supported by ancillary activities (such as employee assistance programs), targeted…

  2. Implementation and Operational Research: Effectiveness and Patient Acceptability of a Sexually Transmitted Infection Self-Testing Program in an HIV Care Setting.

    PubMed

    Barbee, Lindley A; Tat, Susana; Dhanireddy, Shireesha; Marrazzo, Jeanne M

    2016-06-01

    Rates of screening for bacterial sexually transmitted infections (STI) among men who have sex with men in HIV care settings remain low despite high prevalence of these infections. STI self-testing may help increase screening rates in clinical settings. We implemented an STI self-testing program at a large, urban HIV care clinic and evaluated its effectiveness and acceptability. We compared measures obtained during the first year of the STI self-testing program (Intervention Year, April 1, 2013-March 31, 2014) to Baseline Year (January 1, 2012-December 31, 2012) to determine: (1) overall clinic change in STI testing coverage and diagnostic yield and; (2) program-specific outcomes including appropriate anatomic site screening and patient-reported acceptability. Overall, testing for gonorrhea and chlamydia increased significantly between Baseline and Intervention Year, and 50% more gonococcal and 47% more chlamydial infections were detected. Syphilis testing coverage remained unchanged. Nearly 95% of 350 men who participated in the STI self-testing program completed site-specific testing appropriately based on self-reported exposures, and 92% rated their self-testing experience as "good" or "very good." STI self-testing in HIV care settings significantly increases testing coverage and detection of gonorrhea and chlamydia, and the program is acceptable to patients. Additional interventions to increase syphilis screening rates are needed.

  3. The Integration and Test Program of the James Webb Space Telescope

    NASA Technical Reports Server (NTRS)

    Kimble, Randy

    2012-01-01

    The James Webb Space Telescope (JWST) project has entered into a comprehensive integration and test (I&T) program that over the coming years will assemble the various elements of the observatory (the Optical Telescope Element [OTE], the Integrated Science Instrument Module [ISIM], and the Spacecraft) and verify the readiness of the integrated system for launch. The I&T program as replanned for a 2018 launch readiness date has a number of interesting features. These include a streamlined ISIM cryo-vacuum test program at Goddard Space Flight Center, a streamlined OTIS (OTE + ISIM) test program at Johnson Space Center (JSC), the addition of a second Core cryo-vacuum thermal test, the enhancement of the Pathfinder program at JSC, and enhancement of the subsystem-level testing program for the MIRI cryo-cooler. These latter activities all serve to reduce the risk heading into the end-to-end optical and thermal testing of the telescope at JSC, leading to reduced cost and schedule risk for that critical activity. We report here on the overall I&T program for JWST and on the status of the hardware and plans that support it.

  4. Test Planning Approach and Lessons

    NASA Technical Reports Server (NTRS)

    Parkinson, Douglas A.; Brown, Kendall K.

    2004-01-01

    As NASA began technology risk reduction activities and planning for the next generation launch vehicle under the Space Launch Initiative (SLI), now the Next Generation Launch Technology (NGLT) Program, a review of past large liquid rocket engine development programs was performed. The intent of the review was to identify any significant lessons from the development testing programs that could be applied to current and future engine development programs. Because the primary prototype engine in design at the time of this study was the Boeing-Rocketdyne RS-84, the study was slightly biased towards LOX/RP-1 liquid propellant engines. However, the significant lessons identified are universal. It is anticipated that these lessons will serve as a reference for test planning in the Engine Systems Group at Marshall Space Flight Center (MSFC). Towards the end of F-1 and J-2 engine development testing, NASA/MSFC asked Rocketdyne to review those test programs. The result was a document titled, Study to Accelerate Development by Test of a Rocket Engine (R-8099). The "intent (of this study) is to apply this thinking and learning to more efficiently develop rocket engines to high reliability with improved cost effectivenes" Additionally, several other engine programs were reviewed - such as SSME, NSTS, STME, MC-1, and RS-83- to support or refute the R-8099. R-8099 revealed two primary lessons for test planning, which were supported by the other engine development programs. First, engine development programs can benefit from arranging the test program for engine system testing as early as feasible. The best test for determining environments is at the system level, the closest to the operational flight environment. Secondly, the component testing, which tends to be elaborate, should instead be geared towards reducing risk to enable system test. Technical risk can be reduced at the component level, but the design can only be truly verified and validated after engine system testing.

  5. Equating in Small-Scale Language Testing Programs

    ERIC Educational Resources Information Center

    LaFlair, Geoffrey T.; Isbell, Daniel; May, L. D. Nicolas; Gutierrez Arvizu, Maria Nelly; Jamieson, Joan

    2017-01-01

    Language programs need multiple test forms for secure administrations and effective placement decisions, but can they have confidence that scores on alternate test forms have the same meaning? In large-scale testing programs, various equating methods are available to ensure the comparability of forms. The choice of equating method is informed by…

  6. 78 FR 27984 - Modification of the National Customs Automation Program Test (NCAP) Regarding Reconciliation for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-13

    ... Customs Automation Program Test (NCAP) Regarding Reconciliation for Filing Certain Post-Importation Claims... Automation Program (NCAP) Reconciliation prototype test to include the filing of post-importation [[Page... notices. DATES: The test is modified to allow Reconciliation of post-importation preferential tariff...

  7. Achievement Testing of Disadvantaged and Minority Students for Educational Program Evaluation.

    ERIC Educational Resources Information Center

    Wargo, Michael J., Ed.; Green, Donald Ross, Ed.

    The following papers were delivered: Introductory Remarks, John W. Evans; An Evaluator's Perspective, Michael J. Wargo; Problems of Achievement Tests in Program Evaluation, Donald Ross Green; Diverse Human Populations and Problems in Educational Program Evaluation via Achievement Testing, Edmund W. Gordon; Critical Issues in Achievement Testing of…

  8. 76 FR 15945 - National Voluntary Laboratory Accreditation Program (NVLAP) Workshop for Laboratories Interested...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-22

    ... Accreditation Program (NVLAP) is considering establishing an accreditation program for laboratories that test... the general accreditation criteria referenced in Sections 4 and 5 of the NIST handbook 150 to the test... accreditation, test and measurement equipment, personnel requirements, validation of test methods, and reporting...

  9. 75 FR 22809 - Mandatory Guidelines for Federal Workplace Drug Testing Programs

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-30

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Mandatory Guidelines for Federal Workplace Drug Testing... for Federal Workplace Drug Testing Programs (Mandatory Guidelines) from May 1, 2010, to October 1... drug testing programs as soon as possible that they will not be expected to implement the revisions to...

  10. 77 FR 36014 - Initial Test Program of Emergency Core Cooling Systems for Boiling-Water Reactors

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-15

    ... NUCLEAR REGULATORY COMMISSION [NRC-2012-0134] Initial Test Program of Emergency Core Cooling... for public comment draft regulatory guide (DG), DG-1277, ``Initial Test Program of Emergency Core... acceptable to implement with regard to initial testing features of emergency core cooling systems (ECCSs) for...

  11. Test and Verification Approach for the NASA Constellation Program

    NASA Technical Reports Server (NTRS)

    Strong, Edward

    2008-01-01

    This viewgraph presentation is a test and verification approach for the NASA Constellation Program. The contents include: 1) The Vision for Space Exploration: Foundations for Exploration; 2) Constellation Program Fleet of Vehicles; 3) Exploration Roadmap; 4) Constellation Vehicle Approximate Size Comparison; 5) Ares I Elements; 6) Orion Elements; 7) Ares V Elements; 8) Lunar Lander; 9) Map of Constellation content across NASA; 10) CxP T&V Implementation; 11) Challenges in CxP T&V Program; 12) T&V Strategic Emphasis and Key Tenets; 13) CxP T&V Mission & Vision; 14) Constellation Program Organization; 15) Test and Evaluation Organization; 16) CxP Requirements Flowdown; 17) CxP Model Based Systems Engineering Approach; 18) CxP Verification Planning Documents; 19) Environmental Testing; 20) Scope of CxP Verification; 21) CxP Verification - General Process Flow; 22) Avionics and Software Integrated Testing Approach; 23) A-3 Test Stand; 24) Space Power Facility; 25) MEIT and FEIT; 26) Flight Element Integrated Test (FEIT); 27) Multi-Element Integrated Testing (MEIT); 28) Flight Test Driving Principles; and 29) Constellation s Integrated Flight Test Strategy Low Earth Orbit Servicing Capability.

  12. Environmental control and life support testing at the Marshall Space Flight Center

    NASA Technical Reports Server (NTRS)

    Schunk, Richard G.; Humphries, William R.

    1987-01-01

    The Space Station Environmental Control and Life Support System (ECLSS) test program at the Marshall Space Flight Center (MSFC) is addressed. The immediate goals and current activities of the test program are discussed. Also described are the Core Module Integration Facility (CMIF) and the initial ECLSS test configuration. Future plans for the ECLSS test program and the CMIF are summarized.

  13. Engineering Tests for Energy Storage Cars at the Transportation Test Center : Volume 1. Program Description and Test Summary.

    DOT National Transportation Integrated Search

    1977-05-01

    The primary purpose of the tests documented herein was to demonstrate the principles and feasibility of an energy storage type propulsion system, and its adaptability to an existing car design. The test program comprised four phases of tests on two N...

  14. 49 CFR 380.109 - Driver testing.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ....109 Driver testing. (a) Testing methods. The driver-student must pass knowledge and skills tests in... this part for the specific type of LCV training program being taught. (2) Instructors shall develop their own tests for the specific type of LCV-training program being taught, but those tests must be at...

  15. 49 CFR 380.109 - Driver testing.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ....109 Driver testing. (a) Testing methods. The driver-student must pass knowledge and skills tests in... this part for the specific type of LCV training program being taught. (2) Instructors shall develop their own tests for the specific type of LCV-training program being taught, but those tests must be at...

  16. 49 CFR 380.109 - Driver testing.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ....109 Driver testing. (a) Testing methods. The driver-student must pass knowledge and skills tests in... this part for the specific type of LCV training program being taught. (2) Instructors shall develop their own tests for the specific type of LCV-training program being taught, but those tests must be at...

  17. 49 CFR 380.109 - Driver testing.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ....109 Driver testing. (a) Testing methods. The driver-student must pass knowledge and skills tests in... this part for the specific type of LCV training program being taught. (2) Instructors shall develop their own tests for the specific type of LCV-training program being taught, but those tests must be at...

  18. 49 CFR 380.109 - Driver testing.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ....109 Driver testing. (a) Testing methods. The driver-student must pass knowledge and skills tests in... this part for the specific type of LCV training program being taught. (2) Instructors shall develop their own tests for the specific type of LCV-training program being taught, but those tests must be at...

  19. 14 CFR 91.1041 - Aircraft proving and validation tests.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 2 2014-01-01 2014-01-01 false Aircraft proving and validation tests. 91... Ownership Operations Program Management § 91.1041 Aircraft proving and validation tests. (a) No program... tests. However, pilot flight training may be conducted during the proving tests. (d) Validation testing...

  20. 14 CFR 91.1041 - Aircraft proving and validation tests.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 2 2012-01-01 2012-01-01 false Aircraft proving and validation tests. 91... Ownership Operations Program Management § 91.1041 Aircraft proving and validation tests. (a) No program... tests. However, pilot flight training may be conducted during the proving tests. (d) Validation testing...

  1. 14 CFR 91.1041 - Aircraft proving and validation tests.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 2 2013-01-01 2013-01-01 false Aircraft proving and validation tests. 91... Ownership Operations Program Management § 91.1041 Aircraft proving and validation tests. (a) No program... tests. However, pilot flight training may be conducted during the proving tests. (d) Validation testing...

  2. 14 CFR 91.1041 - Aircraft proving and validation tests.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 2 2011-01-01 2011-01-01 false Aircraft proving and validation tests. 91... Ownership Operations Program Management § 91.1041 Aircraft proving and validation tests. (a) No program... tests. However, pilot flight training may be conducted during the proving tests. (d) Validation testing...

  3. 14 CFR 91.1041 - Aircraft proving and validation tests.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Aircraft proving and validation tests. 91... Ownership Operations Program Management § 91.1041 Aircraft proving and validation tests. (a) No program... tests. However, pilot flight training may be conducted during the proving tests. (d) Validation testing...

  4. 41 CFR 300-80.4 - How many test programs may be authorized by GSA throughout the government?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 4 2010-07-01 2010-07-01 false How many test programs may be authorized by GSA throughout the government? 300-80.4 Section 300-80.4 Public Contracts and... TEST PROGRAMS § 300-80.4 How many test programs may be authorized by GSA throughout the government? No...

  5. How to estimate the cost of point-of-care CD4 testing in program settings: an example using the Alere Pima Analyzer in South Africa.

    PubMed

    Larson, Bruce; Schnippel, Kathryn; Ndibongo, Buyiswa; Long, Lawrence; Fox, Matthew P; Rosen, Sydney

    2012-01-01

    Integrating POC CD4 testing technologies into HIV counseling and testing (HCT) programs may improve post-HIV testing linkage to care and treatment. As evaluations of these technologies in program settings continue, estimates of the costs of POC CD4 tests to the service provider will be needed and estimates have begun to be reported. Without a consistent and transparent methodology, estimates of the cost per CD4 test using POC technologies are likely to be difficult to compare and may lead to erroneous conclusions about costs and cost-effectiveness. This paper provides a step-by-step approach for estimating the cost per CD4 test from a provider's perspective. As an example, the approach is applied to one specific POC technology, the Pima Analyzer. The costing approach is illustrated with data from a mobile HCT program in Gauteng Province of South Africa. For this program, the cost per test in 2010 was estimated at $23.76 (material costs  = $8.70; labor cost per test  = $7.33; and equipment, insurance, and daily quality control  = $7.72). Labor and equipment costs can vary widely depending on how the program operates and the number of CD4 tests completed over time. Additional costs not included in the above analysis, for on-going training, supervision, and quality control, are likely to increase further the cost per test. The main contribution of this paper is to outline a methodology for estimating the costs of incorporating POC CD4 testing technologies into an HCT program. The details of the program setting matter significantly for the cost estimate, so that such details should be clearly documented to improve the consistency, transparency, and comparability of cost estimates.

  6. ATM test and integration. [Skylab Apollo Telescope Mount

    NASA Technical Reports Server (NTRS)

    Moore, J. W.; Mitchell, J. R.

    1974-01-01

    The test and checkout philosophy of the test program for the Skylab ATM module and the overall test flow including in-process, post-manufacturing, vibration, thermal vacuum, and prelaunch checkout activities are described. Capabilities and limitations of the test complex and its use of automation are discussed. Experiences with the organizational principle of using a dedicated test team for all checkout activities are reported. Material on the development of the ATM subsystems, the experimental program and the requirements of the scientific community, and the integration and verification of the complex systems/subsystems of the ATM are presented. The performance of the ATM test program in such areas as alignment, systems and subsystems, contamination control, and experiment operation is evaluated. The conclusions and recommendations resulting from the ATM test program are enumerated.

  7. Integrated Structural Analysis and Test Program

    NASA Technical Reports Server (NTRS)

    Kaufman, Daniel

    2005-01-01

    An integrated structural-analysis and structure-testing computer program is being developed in order to: Automate repetitive processes in testing and analysis; Accelerate pre-test analysis; Accelerate reporting of tests; Facilitate planning of tests; Improve execution of tests; Create a vibration, acoustics, and shock test database; and Integrate analysis and test data. The software package includes modules pertaining to sinusoidal and random vibration, shock and time replication, acoustics, base-driven modal survey, and mass properties and static/dynamic balance. The program is commanded by use of ActiveX controls. There is minimal need to generate command lines. Analysis or test files are selected by opening a Windows Explorer display. After selecting the desired input file, the program goes to a so-called analysis data process or test data process, depending on the type of input data. The status of the process is given by a Windows status bar, and when processing is complete, the data are reported in graphical, tubular, and matrix form.

  8. Environmental assessment for the depleted uranium testing program at the Nevada Test Site by the United States Army Ballistics Research Laboratory. [Open-Air Tests and X-Tunnel Tests

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-11-24

    This proposed action provides the Department of Energy (DOE) authorization to the US Army to conduct a testing program using Depleted Uranium (DU) in Area 25 at the Nevada Test Site (NTS). The US Army Ballistic Research Laboratory (BRL) would be the managing agency for the program. The proposed action site would utilize existing facilities, and human activity would be confined to areas identified as having no tortoise activity. Two classifications of tests would be conducted under the testing program: (1) open-air tests, and (2) X-Tunnel tests. A series of investigative tests would be conducted to obtain information on DUmore » use under the conditions of each classification. The open-air tests would include DU ammunition hazard classification and combat systems activity tests. Upon completion of each test or series of tests, the area would be decontaminated to meet requirements of DOE Order 5400.5, Radiation Protection of the Public and Environment. All contaminated materials would be decontaminated or disposed of as radioactive waste in an approved low-level Radioactive Waste Management Site (RWMS) by personnel trained specifically for this purpose.« less

  9. Evaluation of an external quality assessment program for HIV testing in Haiti, 2006-2011.

    PubMed

    Louis, Frantz Jean; Anselme, Renette; Ndongmo, Clement; Buteau, Josiane; Boncy, Jacques; Dahourou, Georges; Vertefeuille, John; Marston, Barbara; Balajee, S Arunmozhi

    2013-12-01

    To evaluate an external quality assessment (EQA) program for human immunodeficiency virus (HIV) rapid diagnostics testing by the Haitian National Public Health Laboratory (French acronym: LNSP). Acceptable performance was defined as any proficiency testing (PT) score more than 80%. The PT database was reviewed and analyzed to assess the testing performance of the participating laboratories and the impact of the program over time. A total of 242 laboratories participated in the EQA program from 2006 through 2011; participation increased from 70 laboratories in 2006 to 159 in 2011. In 2006, 49 (70%) laboratories had a PT score of 80% or above; by 2011, 145 (97.5%) laboratories were proficient (P < .05). The EQA program for HIV testing ensures quality of testing and allowed the LNSP to document improvements in the quality of HIV rapid testing over time.

  10. 1991 LLWAS anemometer test program

    DOT National Transportation Integrated Search

    1992-01-01

    Performance tests of anemometers under icing and snow conditions were conducted during 1990-1991 on the test field at : Rochester, MN and in icing chambers and wind tunnels at Sterling, VA. These tests were done for the FAA LLWAS program : to test se...

  11. Bus Testing Program

    DOT National Transportation Integrated Search

    1993-01-01

    The Bus Testing Program of the Federal Transit Administration was established in response to the requirements of the Surface Transportation and Uniform Relocation Assistance Act (STURAA) of 1987. Under the program, testing is required on all new mode...

  12. DC-10-10 winglet flight test program management

    NASA Technical Reports Server (NTRS)

    Agar, J. R.

    1982-01-01

    This paper discusses the McDonnell Douglas/NASA DC-10-10 winglet flight test program from a program management viewpoint. The program was conducted to obtain flight test data on the same airplane with and without winglets for direct comparison. As occasionally happens in flight tests, unexpected events occur. This program was encumbered by a low-speed buffet anomaly that required several configuration modifications before satisfactory performance could be attained. This paper relates the management techniques utilized to accommodate the unplanned increases in program scope and still complete the program on time and below the budgeted cost.

  13. Nozzle Initiative Industry Advisory Committee on Standardization of Carbon-Phenolic Test Methods and Specifications

    NASA Technical Reports Server (NTRS)

    Bull, William B. (Compiler); Pinoli, Pat C. (Compiler); Upton, Cindy G. (Compiler); Day, Tony (Compiler); Hill, Keith (Compiler); Stone, Frank (Compiler); Hall, William B.

    1994-01-01

    This report is a compendium of the presentations of the 12th biannual meeting of the Industry Advisory Committee under the Solid Propulsion Integrity Program. A complete transcript of the welcoming talks is provided. Presentation outlines and overheads are included for the other sessions: SPIP Overview, Past, Current and Future Activity; Test Methods Manual and Video Tape Library; Air Force Developed Computer Aided Cure Program and SPC/TQM Experience; Magneto-Optical mapper (MOM), Joint Army/NASA program to assess composite integrity; Permeability Testing; Moisture Effusion Testing by Karl Fischer Analysis; Statistical Analysis of Acceptance Test Data; NMR Phenolic Resin Advancement; Constituent Testing Highlights on the LDC Optimization Program; Carbon Sulfur Study, Performance Related Testing; Current Rayon Specifications and Future Availability; RSRM/SPC Implementation; SRM Test Methods, Delta/Titan/FBM/RSRM; and Open Forum on Performance Based Acceptance Testing -- Industry Experience.

  14. Detecting and Correcting Scale Drift in Test Equating: An Illustration from a Large Scale Testing Program

    ERIC Educational Resources Information Center

    Puhan, Gautam

    2009-01-01

    The purpose of this study is to determine the extent of scale drift on a test that employs cut scores. It was essential to examine scale drift for this testing program because new forms in this testing program are often put on scale through a series of intermediate equatings (known as equating chains). This process may cause equating error to…

  15. 78 FR 18932 - Public Meeting: Unmanned Aircraft Systems Test Site Program; Privacy Approach

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-28

    ... operation of the UAS Test Sites. They are not intended to pre-determine the long- term policy and regulatory...-0061] Public Meeting: Unmanned Aircraft Systems Test Site Program; Privacy Approach AGENCY: Federal... the unmanned aircraft systems (UAS) test site program. The FAA is seeking the views from the public...

  16. 78 FR 54510 - New Entrant Safety Assurance Program Operational Test

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-04

    ...-0298] New Entrant Safety Assurance Program Operational Test AGENCY: Federal Motor Carrier Safety...) announces an operational test of procedural changes to the New Entrant Safety Assurance Program. The operational test began in July 2013 and will be in effect for up to 12 months. It is applicable to new entrant...

  17. 78 FR 75961 - Energy Conservation Program: Test Procedures for Electric Motors

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-13

    ... Conservation Program: Test Procedures for Electric Motors; Final Rule #0;#0;Federal Register / Vol. 78 , No... CFR Part 431 [Docket No. EERE-2012-BT-TP-0043] RIN 1904-AC89 Energy Conservation Program: Test.... ACTION: Final rule. SUMMARY: The U.S. Department of Energy (DOE) is amending the energy efficiency test...

  18. Drug Testing High School Athletes and the Fourth Amendment.

    ERIC Educational Resources Information Center

    Bjorklun, Eugene C.

    1993-01-01

    Examines recent court decisions regarding the legality of drug-testing programs aimed at student athletes. Concludes the drug-testing programs will be upheld if the program is narrowly drawn with regard to the student population; aims at limited and achievable goals; involves random selection of students for testing; and imposes penalties…

  19. 47 CFR 73.713 - Program tests.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... International Broadcast Stations § 73.713 Program tests. (a) Upon completion of construction of an international.... The Commission reserves the right to change the date of the beginning of such tests or to suspend or revoke the authority for program tests as and when such action may appear to be in the public interest...

  20. Initiation of depleted uranium oxide and spent fuel testing for the spent fuel sabotage aerosol ratio program.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gregson, Michael Warren; Mo, Tin; Sorenson, Ken Bryce

    The authors provide a detailed overview of an on-going, multinational test program that is developing aerosol data for some spent fuel sabotage scenarios on spent fuel transport and storage casks. Experiments are being performed to quantify the aerosolized materials plus volatilized fission products generated from actual spent fuel and surrogate material test rods, due to impact by a high-energy-density device. The program participants in the United States plus Germany, France and the United Kingdom, part of the international Working Group for Sabotage Concerns of Transport and Storage Casks (WGSTSC) have strongly supported and coordinated this research program. Sandia National Laboratoriesmore » has the lead role for conducting this research program; test program support is provided by both the US Department of Energy and the US Nuclear Regulatory Commission. The authors provide a summary of the overall, multiphase test design and a description of all explosive containment and aerosol collection test components used. They focus on the recently initiated tests on 'surrogate' spent fuel, unirradiated depleted uranium oxide and forthcoming actual spent fuel tests, and briefly summarize similar results from completed surrogate tests that used non-radioactive, sintered cerium oxide ceramic pellets in test rods.« less

  1. A community-based aquatic exercise program to improve endurance and mobility in adults with mild to moderate intellectual disability.

    PubMed

    Hakim, Renée M; Ross, Michael D; Runco, Wendy; Kane, Michael T

    2017-02-01

    The purpose of this study was to investigate the impact of a community-based aquatic exercise program on physical performance among adults with mild to moderate intellectual disability (ID). Twenty-two community-dwelling adults with mild to moderate ID volunteered to participate in this study. Participants completed an 8-week aquatic exercise program (2 days/wk, 1 hr/session). Measures of physical performance, which were assessed prior to and following the completion of the aquatic exercise program, included the timed-up-and-go test, 6-min walk test, 30-sec chair stand test, 10-m timed walk test, hand grip strength, and the static plank test. When comparing participants' measures of physical performance prior to and following the 8-week aquatic exercise program, improvements were seen in all measures, but the change in scores for the 6-min walk test, 30-sec chair stand test, and the static plank test achieved statistical significance ( P <0.05). An 8-week group aquatic exercise program for adults with ID may promote improvements in endurance and balance/mobility.

  2. 78 FR 66039 - Modification of National Customs Automation Program Test Concerning Automated Commercial...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-04

    ... Customs Automation Program Test Concerning Automated Commercial Environment (ACE) Cargo Release (Formerly... Simplified Entry functionality in the Automated Commercial Environment (ACE). Originally, the test was known...) test concerning Automated Commercial Environment (ACE) Simplified Entry (SE test) functionality is...

  3. Summary of Rocketdyne Engine A5 Rocket Based Combined Cycle Testing

    NASA Technical Reports Server (NTRS)

    Ketchum. A.; Emanuel, Mark; Cramer, John

    1998-01-01

    Rocketdyne Propulsion and Power (RPP) has completed a highly successful experimental test program of an advanced rocket based combined cycle (RBCC) propulsion system. The test program was conducted as part of the Advanced Reusable Technology program directed by NASA-MSFC to demonstrate technologies for low-cost access to space. Testing was conducted in the new GASL Flight Acceleration Simulation Test (FAST) facility at sea level (Mach 0), Mach 3.0 - 4.0, and vacuum flight conditions. Significant achievements obtained during the test program include 1) demonstration of engine operation in air-augmented rocket mode (AAR), ramjet mode and rocket mode and 2) smooth transition from AAR to ramjet mode operation. Testing in the fourth mode (scramjet) is scheduled for November 1998.

  4. DSN system performance test software

    NASA Technical Reports Server (NTRS)

    Martin, M.

    1978-01-01

    The system performance test software is currently being modified to include additional capabilities and enhancements. Additional software programs are currently being developed for the Command Store and Forward System and the Automatic Total Recall System. The test executive is the main program. It controls the input and output of the individual test programs by routing data blocks and operator directives to those programs. It also processes data block dump requests from the operator.

  5. 76 FR 45257 - Agency Forms Undergoing Paperwork Reduction Act Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-28

    ... Training Retreat Post-test... 50 1 3/60 3 Physician Training Retreat 3-Month 30 1 2/60 1 Follow-up. Health professionals CBIT Program Evaluation 500 1 2/60 17 CBIT Pre-test 500 1 3/60 25 CBIT Post-test 500 1 3/60 25... Education Program Evaluation 1,200 1 2/60 40 Education Program Pre-test 800 1 3/60 40 Education Program Post...

  6. Student Achievement Testing Program: Grade 3 Social Studies.

    ERIC Educational Resources Information Center

    Student Evaluation Branch Bulletin, 1983

    1983-01-01

    The purpose of this bulletin is to provide information about the Alberta (Canada) Grade 3 Social Studies Achievement Test. The Bulletin includes a general description of the Achievement Testing Program, a description of the Grade 3 Social Studies Achievement Test, an outline of the objectives to be tested, and the test blueprint. Student…

  7. Selected topics in railroad tank car safety. Volume 2 : test plan for accelerated life testing of thermally shielded tank cars

    DOT National Transportation Integrated Search

    1978-08-01

    A test plan for the accelerated life testing of thermally shielded tank cars is described. The test program would be conducted at the DOT Transportation Test Center in Pueblo, Colorado. Eighteen tank cars would be included in the program. Five cars w...

  8. Detailed Test Plan Redundant Sensor Strapdown IMU Evaluation Program

    NASA Technical Reports Server (NTRS)

    Hartwell, T.; Miyatake, Y.; Wedekind, D. E.

    1971-01-01

    The test plan for a redundant sensor strapdown inertial measuring unit evaluation program is presented. The subjects discussed are: (1) test philosophy and limitations, (2) test sequence, (3) equipment specifications, (4) general operating procedures, (5) calibration procedures, (6) alignment test phase, and (7) navigation test phase. The data and analysis requirements are analyzed.

  9. Handbook for Classroom Testing in Peace Corps Language Programs. Manual T0068.

    ERIC Educational Resources Information Center

    Anderson, Neil J.

    This manual provides instructors in Peace Corps language training programs with information about two kinds of classroom testing: formative, ongoing testing and summative testing that occurs at the end of an instructional period. The first of the manual's four chapters on the purposes of language testing, discusses language testing within a…

  10. Client characteristics and gender-specific correlates of testing HIV positive: a comparison of standalone center versus mobile outreach HIV testing and counseling in Botswana.

    PubMed

    Hood, Julia E; MacKellar, Duncan; Spaulding, Anne; Nelson, Rob; Mosiakgabo, Boingotlo; Sikwa, Bangwato; Puso, Innocentia; Raats, Jan; Loeto, Peter; Alwano, Mary Grace; Monyatsi, Blessed

    2012-10-01

    Using data from Botswana's largest HIV testing and counseling (HTC) provider, Tebelopele, we evaluate populations served and gender-specific correlates of testing HIV-positive among clients of two programs: standalone centers and outreach testing. Client records from January to June 2007 (n = 47,890) were evaluated by HTC program and gender. Bivariate and multivariate analyses were performed to identify demographic, testing, and risk-behavior variables associated with testing HIV-positive. Compared to outreach testing, standalone centers served proportionally more clients who were young, well-educated, unmarried, and HIV-infected; outreach testing reached an older, less-educated population. Age, educational attainment, marital status, couples testing, testing because of illness or discordant relationship, and nonuse of condoms (among young clients only) were consistently associated with testing HIV-positive, by HTC program and gender. Our evaluation suggests that Tebelopele standalone and outreach HTC programs serve different populations, and identifies strategies to reduce HIV infection risk and to improve uptake of HTC by HIV-infected, undiagnosed Batswana.

  11. Computer program for the Kendall family of trend tests

    USGS Publications Warehouse

    Helsel, Dennis R.; Mueller, David K.; Slack, James R.

    2006-01-01

    The Seasonal Kendall (SK) test for trend was developed by the U.S. Geological Survey and has become the most frequently used test for trend in the environmental sciences. Recently the test was modified to form the Regional Kendall (RK) test for trend. In this form, trends at numerous locations within a region are tested to determine whether the direction of trend is consistent across the entire region. Computer code developed at the USGS in the 1980s to perform the SK test is no longer widely available. Other versions written by other scientists may or may not be easily available, and may require commercial software in order to be run. These other versions do not explicitly compute the RK test. Therefore, the original code for computing the SK test has been repackaged into a program that runs under the Windows operating system. This program may be used to verify that other implementations of the test give the same results as the original. The program also provides a means for computing the RK test and the simpler Mann-Kendall test for trend.

  12. Overcoming nursing barriers to intensive care unit early mobilisation: A quality improvement project.

    PubMed

    Hunter, Oluwatobi O; George, Elisabeth L; Ren, Dianxu; Morgan, Douglas; Rosenzweig, Margaret; Klinefelter Tuite, Patricia

    2017-06-01

    To increase adherence with intensive care unit mobility by developing and implementing a mobility training program that addresses nursing barriers to early mobilisation. An intensive care unit mobility training program was developed, implemented and evaluated with a pre-test, immediate post-test and eight-week post-test. Patient mobility was tracked before and after training. A ten bed cardiac intensive care unit. The training program's efficacy was measured by comparing pre-test, immediate post-test and 8-week post-test scores. Patient mobilisation rates before and after training were compared. Protocol compliance was measured in the post training group. Nursing knowledge increased from pre-test to immediate post-test (p<0.0001) and pre-test to 8-week post-test (p<0.0001). Mean test scores decreased by seven points from immediate post-test (80±12) to 8-week post-test (73±14). Fear significantly decreased from pre-test to immediate post-test (p=0.03), but not from pre-test to 8-week post-test (p=0.06) or immediate post-test to 8-week post-test (p=0.46). Post training patient mobility rates increased although not significantly (p=0.07). Post training protocol compliance was 78%. The project successfully increased adherence with intensive care unit mobility and indicates that a training program could improve adoption of early mobility. Copyright © 2016 Elsevier Ltd. All rights reserved.

  13. The cost-effectiveness of rapid HIV testing in substance abuse treatment: results of a randomized trial.

    PubMed

    Schackman, Bruce R; Metsch, Lisa R; Colfax, Grant N; Leff, Jared A; Wong, Angela; Scott, Callie A; Feaster, Daniel J; Gooden, Lauren; Matheson, Tim; Haynes, Louise F; Paltiel, A David; Walensky, Rochelle P

    2013-02-01

    The President's National HIV/AIDS Strategy calls for coupling HIV screening and prevention services with substance abuse treatment programs. Fewer than half of US community-based substance abuse treatment programs make HIV testing available on-site or through referral. We measured the cost-effectiveness of three HIV testing strategies evaluated in a randomized trial conducted in 12 community-based substance abuse treatment programs in 2009: off-site testing referral, on-site rapid testing with information only, on-site rapid testing with risk-reduction counseling. Data from the trial included patient demographics, prior testing history, test acceptance and receipt of results, undiagnosed HIV prevalence (0.4%) and program costs. The Cost-Effectiveness of Preventing AIDS Complications (CEPAC) computer simulation model was used to project life expectancy, lifetime costs, and quality-adjusted life years (QALYs) for HIV-infected individuals. Incremental cost-effectiveness ratios (2009 US $/QALY) were calculated after adding costs of testing HIV-uninfected individuals; costs and QALYs were discounted at 3% annually. Referral for off-site testing is less efficient (dominated) compared to offering on-site testing with information only. The cost-effectiveness ratio for on-site testing with information is $60,300/QALY in the base case, or $76,300/QALY with 0.1% undiagnosed HIV prevalence. HIV risk-reduction counseling costs $36 per person more without additional benefit. A strategy of on-site rapid HIV testing offer with information only in substance abuse treatment programs increases life expectancy at a cost-effectiveness ratio <$100,000/QALY. Policymakers and substance abuse treatment leaders should seek funding to implement on-site rapid HIV testing in substance abuse treatment programs for those not recently tested. Copyright © 2012 Elsevier Ireland Ltd. All rights reserved.

  14. The Cost-effectiveness of Rapid HIV Testing in Substance Abuse Treatment: Results of a Randomized Trial*

    PubMed Central

    Schackman, Bruce R.; Metsch, Lisa R.; Colfax, Grant N.; Leff, Jared A.; Wong, Angela; Scott, Callie A.; Feaster, Daniel J.; Gooden, Lauren; Matheson, Tim; Haynes, Louise F.; Paltiel, A. David; Walensky, Rochelle P.

    2012-01-01

    BACKGROUND The President’s National HIV/AIDS Strategy calls for coupling HIV screening and prevention services with substance abuse treatment programs. Fewer than half of US community-based substance abuse treatment programs make HIV testing available on-site or through referral. METHODS We measured the cost-effectiveness of three HIV testing strategies evaluated in a randomized trial conducted in 12 community-based substance abuse treatment programs in 2009: off-site testing referral, on-site rapid testing with information only, on-site rapid testing with risk reduction counseling. Data from the trial included patient demographics, prior testing history, test acceptance and receipt of results, undiagnosed HIV prevalence (0.4%) and program costs. The Cost Effectiveness of Preventing AIDS Complications (CEPAC) computer simulation model was used to project life expectancy, lifetime costs, and quality-adjusted life years (QALYs) for HIV-infected individuals. Incremental cost-effectiveness ratios (2009 US $/QALY) were calculated after adding costs of testing HIV-uninfected individuals; costs and QALYs were discounted at 3% annually. RESULTS Referral for off-site testing is less efficient (dominated) compared to offering on-site testing with information only. The cost-effectiveness ratio for on-site testing with information is $60,300/QALY in the base case, or $76,300/QALY with 0.1% undiagnosed HIV prevalence. HIV risk-reduction counseling costs $36 per person more without additional benefit. CONCLUSIONS A strategy of on-site rapid HIV testing offer with information only in substance abuse treatment programs increases life expectancy at a cost-effectiveness ratio <$100,000/QALY. Policymakers and substance abuse treatment leaders should seek funding to implement on-site rapid HIV testing in substance abuse treatment programs for those not recently tested. PMID:22971593

  15. Using an On-Line Test To Assess Reading Skills and Predict the Ability To Successfully Pass a Reading SOL Test.

    ERIC Educational Resources Information Center

    Simpson, Katherine P.

    Designing a remediation program to meet students' needs involves finding out what a student knows and needs to know. An online testing program, such as eduTest, may provide the answers. This test is a versatile instrument that offers benchmark tests, grade specific tests, and strand tests in the four content areas for grades K through 8. The…

  16. 78 FR 39190 - Revisions to Fitness for Duty Programs' Drug Testing Requirements

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-01

    ...-0225] RIN 3150-AI67 Revisions to Fitness for Duty Programs' Drug Testing Requirements AGENCY: Nuclear... regarding drug testing requirements in NRC licensees' fitness for duty programs. The regulatory basis...

  17. 49 CFR 40.107 - Who may inspect laboratories?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... DRUG AND ALCOHOL TESTING PROGRAMS Drug Testing Laboratories § 40.107 Who may inspect laboratories? As a...-regulated employer that contracts with the laboratory for drug testing under the DOT drug testing program...

  18. 49 CFR 40.107 - Who may inspect laboratories?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... DRUG AND ALCOHOL TESTING PROGRAMS Drug Testing Laboratories § 40.107 Who may inspect laboratories? As a...-regulated employer that contracts with the laboratory for drug testing under the DOT drug testing program...

  19. 49 CFR 40.107 - Who may inspect laboratories?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... DRUG AND ALCOHOL TESTING PROGRAMS Drug Testing Laboratories § 40.107 Who may inspect laboratories? As a...-regulated employer that contracts with the laboratory for drug testing under the DOT drug testing program...

  20. 49 CFR 40.107 - Who may inspect laboratories?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... DRUG AND ALCOHOL TESTING PROGRAMS Drug Testing Laboratories § 40.107 Who may inspect laboratories? As a...-regulated employer that contracts with the laboratory for drug testing under the DOT drug testing program...

  1. 49 CFR 40.107 - Who may inspect laboratories?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... DRUG AND ALCOHOL TESTING PROGRAMS Drug Testing Laboratories § 40.107 Who may inspect laboratories? As a...-regulated employer that contracts with the laboratory for drug testing under the DOT drug testing program...

  2. HIV Testing Among Young People Aged 16-24 in South Africa: Impact of Mass Media Communication Programs.

    PubMed

    Do, Mai; Figueroa, Maria Elena; Lawrence Kincaid, D

    2016-09-01

    Knowing one's serostatus is critical in the HIV prevention, care and treatment continuum. This study examines the impact of communication programs on HIV testing in South Africa. Data came from 2204 young men and women aged 16-24 who reported to be sexually active in a population based survey. Structural equation modeling was used to test the directions and causal pathways between communication program exposure, HIV testing discussion, and having a test in the last 12 months. Bivariate and multivariate probit regressions provided evidence of exogeneity of communication exposure and the two HIV-related outcomes. One in three sampled individuals had been tested in the last 12 months. Communication program exposure only had an indirect effect on getting tested by encouraging young people to talk about testing. The study suggests that communication programs may create an environment that supports open HIV-related discussions and may have a long-term impact on behavior change.

  3. Space Launch System Base Heating Test: Sub-Scale Rocket Engine/Motor Design, Development and Performance Analysis

    NASA Technical Reports Server (NTRS)

    Mehta, Manish; Seaford, Mark; Kovarik, Brian; Dufrene, Aaron; Solly, Nathan; Kirchner, Robert; Engel, Carl D.

    2014-01-01

    The Space Launch System (SLS) base heating test is broken down into two test programs: (1) Pathfinder and (2) Main Test. The Pathfinder Test Program focuses on the design, development, hot-fire test and performance analyses of the 2% sub-scale SLS core-stage and booster element propulsion systems. The core-stage propulsion system is composed of four gaseous oxygen/hydrogen RS-25D model engines and the booster element is composed of two aluminum-based model solid rocket motors (SRMs). The first section of the paper discusses the motivation and test facility specifications for the test program. The second section briefly investigates the internal flow path of the design. The third section briefly shows the performance of the model RS-25D engines and SRMs for the conducted short duration hot-fire tests. Good agreement is observed based on design prediction analysis and test data. This program is a challenging research and development effort that has not been attempted in 40+ years for a NASA vehicle.

  4. Corps of Engineers National Automation Team (CENAT) Technology Transfer Test Bed (T(3)B) Demonstration of the Design 4D Program

    DTIC Science & Technology

    1989-11-01

    other design tools. RESULTS OF TEST/DEMONSTRATION: Training for the Design 4D Program was conducted at USACERL. Although nearly half of the test...subjects had difficulty with the prompts, their understanding of the program improved after experimenting with the commands. After training , most felt...Equipment Testing Process 3 TEST DISTRICT TRAINING ........................................... 10 Training Process Post Training Survey Post Training

  5. NASA LeRC's Acoustic Fill Effect Test Program and Results

    NASA Technical Reports Server (NTRS)

    Hughes, William O.; Mcnelis, Mark E.; Manning, Jerome E.

    1994-01-01

    NASA Lewis Research Center, in conjunction with General Dynamics Space Systems Division, has performed a test program to investigate the acoustic fill effect for an unblanketed payload fairing for a variety of payload simulators. This paper will discuss this test program and fill factor test data, and make comparisons with theoretical predictions. This paper will also address the NASA acoustic fill effect standard which was verified from the test data analysis.

  6. Test program for transmitter experiment package and heat pipe system for the communications technology satellite

    NASA Technical Reports Server (NTRS)

    Depauw, J. F.; Reader, K. E.; Staskus, J. V.

    1976-01-01

    The test program is described for the 200 watt transmitter experiment package and the variable conductance heat pipe system which are components of the high-power transponder aboard the Communications Technology Satellite. The program includes qualification tests to demonstrate design adequacy, acceptance tests to expose latent defects in flight hardware, and development tests to integrate the components into the transponder system and to demonstrate compatibility.

  7. Teaching children about bicycle safety: an evaluation of the New Jersey Bike School program.

    PubMed

    Lachapelle, Ugo; Noland, Robert B; Von Hagen, Leigh Ann

    2013-03-01

    There are multiple health and environmental benefits associated with increasing bicycling among children. However, the use of bicycles is also associated with severe injuries and fatalities. In order to reduce bicycle crashes, a bicycling education program was implemented in selected New Jersey schools and summer camps as part of the New Jersey Safe Routes to School Program. Using a convenience sample of participants to the program, an opportunistic study was designed to evaluate the effectiveness of two bicycle education programs, the first a more-structured program delivered in a school setting, with no on-road component, and the other a less structured program delivered in a summer camp setting that included an on-road component. Tests administered before and after training were designed to assess knowledge acquired during the training. Questions assessed children's existing knowledge of helmet use and other equipment, bicycle safety, as well as their ability to discriminate hazards and understand rules of the road. Participating children (n=699) also completed a travel survey that assessed their bicycling behavior and their perception of safety issues. Response to individual questions, overall pre- and post-training test scores, and changes in test scores were compared using comparison of proportion, t-tests, and ordinary least-squares (OLS) regression. Improvements between the pre-training and post-training test are apparent from the frequency distribution of test results and from t-tests. Both summer camps and school-based programs recorded similar improvements in test results. Children who bicycled with their parents scored higher on the pre-training test but did not improve as much on the post-training test. Without evaluating long-term changes in behavior, it is difficult to ascertain how successful the program is on eventual behavioral and safety outcomes. Copyright © 2012 Elsevier Ltd. All rights reserved.

  8. Bringing the DuPont Profitability Model to Extension

    ERIC Educational Resources Information Center

    Roucan-Kane, Maud; Wolfskill, L. A.; Boehlje, Michael D.; Gray, Allan W.

    2013-01-01

    This article discusses a financial training program used by Deere and Company for almost 10 years. The objective is to describe the program and to discuss a pre-test/post-test methodology to test the effectiveness of a program for possible duplication by Extension. Results show that participants significantly improved from the pre-test to the…

  9. Three Essays on Teacher Education Programs and Test-Takers' Response Times on Test Items

    ERIC Educational Resources Information Center

    Qian, Hong

    2013-01-01

    This dissertation includes three essays: one essay focuses on the effect of teacher preparation programs on teacher knowledge while the other two focus on test-takers' response times on test items. Essay One addresses the problem of how opportunities to learn in teacher preparation programs influence future elementary mathematics teachers'…

  10. Profiles of Learning. The Basic Skills Testing Program in New South Wales: 1989.

    ERIC Educational Resources Information Center

    Masters, Geofferey; And Others

    This publication on the New South Wales' Basic Skills Testing Program (BSTP) describes the development of the program's tests, the analysis of students' results, and the communication of results to parents, teachers, and schools. In BSTP tests, basic skills are defined not as low-level, rudimentary survival skills, but as major areas of learning…

  11. 77 FR 11367 - Defense Federal Acquisition Regulation Supplement; Extension of the Test Program for Negotiation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-24

    ... Federal Acquisition Regulation Supplement; Extension of the Test Program for Negotiation of Comprehensive... Program for Negotiation of Comprehensive Small Business Subcontracting Plans. DATES: Effective Date... Fiscal Year 2012, (Pub. L. 112-81). Section 866 amends the DoD Test Program for Negotiation of...

  12. The Role of Evaluation and Plans for Evaluating the Current Testing Program.

    ERIC Educational Resources Information Center

    Winters, Lynn

    The Palos Verdes Peninsula Unified School District Office of Program Evaluation and Research is responsible for providing information for program development and improvement; providing test information to special programs coordinators; and acting as a clearinghouse for all information concerning tests, evaluation methodology, and educational…

  13. Assessing Foreign Language Proficiency of Undergraduates. Issues in Language Program Direction: A Series of Annual Volumes.

    ERIC Educational Resources Information Center

    Teschner, Richard V., Ed.

    This collection of papers includes: "Foreign Language Testing Today: Issues in Language Program Direction" (Frank Nuessel); "Assessing the Problems of Assessment" (M. Peter Hagiwara); "Testing in Foreign Language Programs and Testing Programs in Foreign Language Departments: Reflections and Recommendations" (Elizabeth…

  14. Repeat GED[R] Tests Examinees: Who Persists and Who Passes? GED Testing Service [R]Research Studies, 2010-2

    ERIC Educational Resources Information Center

    Zhang, Jizhi; Patterson, Margaret Becker

    2010-01-01

    Like most high-stakes testing programs, the GED[R] testing program allows examinees who do not pass on the first attempt to retake the GED Tests. Studies and reports have described GED Tests candidates' characteristics and testing performance, but no study has targeted repeat examinees. A series of questions related to repeat examinees remains…

  15. Berthing mechanism final test report and program assessment

    NASA Technical Reports Server (NTRS)

    1988-01-01

    The purpose is to document the testing performed on both hardware and software developed under the Space Station Berthing Mechanisms Program. Testing of the mechanism occurred at three locations. Several system components, e.g., actuators and computer systems, were functionally tested before assembly. A series of post assembly tests were performed. The post assembly tests, as well as the dynamic testing of the mechanism, are presented.

  16. Environmental assessment for the depleted uranium testing program at the Nevada Test Site by the United States Army Ballistics Research Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-11-24

    This proposed action provides the Department of Energy (DOE) authorization to the US Army to conduct a testing program using Depleted Uranium (DU) in Area 25 at the Nevada Test Site (NTS). The US Army Ballistic Research Laboratory (BRL) would be the managing agency for the program. The proposed action site would utilize existing facilities, and human activity would be confined to areas identified as having no tortoise activity. Two classifications of tests would be conducted under the testing program: (1) open-air tests, and (2) X-Tunnel tests. A series of investigative tests would be conducted to obtain information on DUmore » use under the conditions of each classification. The open-air tests would include DU ammunition hazard classification and combat systems activity tests. Upon completion of each test or series of tests, the area would be decontaminated to meet requirements of DOE Order 5400.5, Radiation Protection of the Public and Environment. All contaminated materials would be decontaminated or disposed of as radioactive waste in an approved low-level Radioactive Waste Management Site (RWMS) by personnel trained specifically for this purpose.« less

  17. 77 FR 24341 - Energy Conservation Program: Test Procedures for Residential Clothes Washers; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-24

    ... Program: Test Procedures for Residential Clothes Washers; Correction AGENCY: Office of Energy Efficiency... final rule establishing new and amended test procedures for residential clothes washers, published in... Energy (DOE) erroneously referenced the new test procedure, rather than the currently effective test...

  18. 14 CFR 120.123 - Drug testing outside the territory of the United States.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Drug testing outside the territory of the... OPERATIONS DRUG AND ALCOHOL TESTING PROGRAM Drug Testing Program Requirements § 120.123 Drug testing outside the territory of the United States. (a) No part of the testing process (including specimen collection...

  19. 14 CFR 120.123 - Drug testing outside the territory of the United States.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Drug testing outside the territory of the... OPERATIONS DRUG AND ALCOHOL TESTING PROGRAM Drug Testing Program Requirements § 120.123 Drug testing outside the territory of the United States. (a) No part of the testing process (including specimen collection...

  20. 14 CFR 120.123 - Drug testing outside the territory of the United States.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Drug testing outside the territory of the... OPERATIONS DRUG AND ALCOHOL TESTING PROGRAM Drug Testing Program Requirements § 120.123 Drug testing outside the territory of the United States. (a) No part of the testing process (including specimen collection...

  1. 14 CFR 120.123 - Drug testing outside the territory of the United States.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Drug testing outside the territory of the... OPERATIONS DRUG AND ALCOHOL TESTING PROGRAM Drug Testing Program Requirements § 120.123 Drug testing outside the territory of the United States. (a) No part of the testing process (including specimen collection...

  2. 14 CFR 120.123 - Drug testing outside the territory of the United States.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Drug testing outside the territory of the... OPERATIONS DRUG AND ALCOHOL TESTING PROGRAM Drug Testing Program Requirements § 120.123 Drug testing outside the territory of the United States. (a) No part of the testing process (including specimen collection...

  3. Exploring Equity Properties in Equating Using AP® Examinations. Research Report No. 2012-4

    ERIC Educational Resources Information Center

    Lee, Eunjung; Lee, Won-Chan; Brennan, Robert L.

    2012-01-01

    In almost all high-stakes testing programs, test equating is necessary to ensure that test scores across multiple test administrations are equivalent and can be used interchangeably. Test equating becomes even more challenging in mixed-format tests, such as Advanced Placement Program® (AP®) Exams, that contain both multiple-choice and constructed…

  4. CERCA LEU fuel assemblies testing in Maria Reactor - safety analysis summary and testing program scope.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pytel, K.; Mieleszczenko, W.; Lechniak, J.

    2010-03-01

    The presented paper contains neutronic and thermal-hydraulic (for steady and unsteady states) calculation results prepared to support annex to Safety Analysis Report for MARIA reactor in order to obtain approval for program of testing low-enriched uranium (LEU) lead test fuel assemblies (LTFA) manufactured by CERCA. This includes presentation of the limits and operational constraints to be in effect during the fuel testing investigations. Also, the scope of testing program (which began in August 2009), including additional measurements and monitoring procedures, is described.

  5. Waltz Mill testing of 345-kV PPP cable

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Burghardt, R.R.

    1991-09-01

    A 345-kV PPP-insulated cable was subjected to a two-year accelerated life test program at the EPRI Waltz Mill Cable Test Facility. Testing started in November 1985 and was successfully completed in September 1988. The program included conductor temperatures ranging from 85{degrees}C to 105{degrees}C and line-to-line voltages from 362 kV to 474 kV. Cyclic testing was performed during 17 of the 24 months. Dissipation factor measurements were made throughout the program. The measurements indicated no deterioration of the cable or splices as a consequence of the high temperatures and voltages applied to them in this test program. 2 refs., 24 figs.

  6. Waltz Mill testing of 765-kV paper-polypropylene-paper (PPP) cable. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Burghardt, R.R.

    1992-06-01

    A 765-kV PPP-insulated cable was subjected to a 27-month accelerated life test program at the EPRI Waltz Mill Cable Test Facility. Testing started in August 1981 and was successfully completed in January 1985. The program included conductor temperatures ranging from 85{degree}C to 105{degree}C and line-to-line voltages from 800 kV to 1050 kV. Cyclic testing was performed during 20 of the 27 months. Dissipation factor measurements were made throughout the program. The measurements indicated no deterioration of the cable or splices as a consequence of the high temperatures and voltages applied to them in this test program.

  7. Waltz Mill testing of 765-kV paper-polypropylene-paper (PPP) cable

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Burghardt, R.R.

    1992-06-01

    A 765-kV PPP-insulated cable was subjected to a 27-month accelerated life test program at the EPRI Waltz Mill Cable Test Facility. Testing started in August 1981 and was successfully completed in January 1985. The program included conductor temperatures ranging from 85{degree}C to 105{degree}C and line-to-line voltages from 800 kV to 1050 kV. Cyclic testing was performed during 20 of the 27 months. Dissipation factor measurements were made throughout the program. The measurements indicated no deterioration of the cable or splices as a consequence of the high temperatures and voltages applied to them in this test program.

  8. Proton Exchange Membrane Fuel Cell Engineering Model Powerplant. Test Report: Benchmark Tests in Three Spatial Orientations

    NASA Technical Reports Server (NTRS)

    Loyselle, Patricia; Prokopius, Kevin

    2011-01-01

    Proton exchange membrane (PEM) fuel cell technology is the leading candidate to replace the aging alkaline fuel cell technology, currently used on the Shuttle, for future space missions. This test effort marks the final phase of a 5-yr development program that began under the Second Generation Reusable Launch Vehicle (RLV) Program, transitioned into the Next Generation Launch Technologies (NGLT) Program, and continued under Constellation Systems in the Exploration Technology Development Program. Initially, the engineering model (EM) powerplant was evaluated with respect to its performance as compared to acceptance tests carried out at the manufacturer. This was to determine the sensitivity of the powerplant performance to changes in test environment. In addition, a series of tests were performed with the powerplant in the original standard orientation. This report details the continuing EM benchmark test results in three spatial orientations as well as extended duration testing in the mission profile test. The results from these tests verify the applicability of PEM fuel cells for future NASA missions. The specifics of these different tests are described in the following sections.

  9. Development and implementation of a quality assurance program for a hormonal contraceptive implant.

    PubMed

    Owen, Derek H; Jenkins, David; Cancel, Aida; Carter, Eli; Dorflinger, Laneta; Spieler, Jeff; Steiner, Markus J

    2013-04-01

    The importance of the distribution of safe, effective and cost-effective pharmaceutical products in resource-constrained countries is the subject of increasing attention. FHI 360 has developed a program aimed at evaluating the quality of a contraceptive implant manufactured in China, while the product is being registered in an increasing number of countries and distributed by international procurement agencies. The program consists of (1) independent product testing; (2) ongoing evaluation of the manufacturing facility through audits and inspections; and (3) post-marketing surveillance. This article focuses on the laboratory testing of the product. The various test methods were chosen from the following test method compendia, the United States Pharmacopeia (USP), British Pharmacopeia (BP), International Organization for Standardization (ISO), the American Society for Testing and Materials (ASTM), or lot release tests mandated by Chinese regulatory requirements. Each manufactured lot is independently tested prior to its distribution to countries supported by this program. In addition, a more detailed annual testing program includes evaluation of the active ingredient (levonorgestrel), the final product and the packaging material. Over the first 4 years of this 5-year project, all tested lots met the established quality criteria. The quality assurance program developed for this contraceptive implant has helped ensure that a safe product was being introduced into developing country family planning programs. This program provides a template for establishing quality assurance programs for other cost-effective pharmaceutical products that have not yet received stringent regulatory approval and are being distributed in resource-poor settings. Copyright © 2013 Elsevier Inc. All rights reserved.

  10. Drug Testing Incoming Residents and Medical Students in Family Medicine Training: A Survey of Program Policies and Practices.

    PubMed

    Bell, Paul F; Semelka, Michael W; Bigdeli, Laleh

    2015-03-01

    Despite well-established negative consequences, high rates of substance use and related disorders continue to be reported. Physicians in training are not immune from this, or the associated risks to their health and careers, while impaired physicians are a threat to patient safety. We surveyed family medicine residency programs' practices relating to drug testing of medical students and incoming residents. The survey asked about the extent to which residency programs are confronted with trainees testing positive for prohibited substances, and how they respond. The survey was sent to the directors of family medicine residency programs. A total of 205 directors (47.2%) completed the survey. A majority of the responding programs required drug testing for incoming residents (143, 68.9%). Most programs did not require testing of medical students (161, 81.7%). Few programs reported positive drug tests among incoming residents (9, 6.5%), and there was only 1 reported instance of a positive result among medical students (1, 3.3%). Respondents reported a range of responses to positive results, with few reporting that they would keep open training spots or offer supportive services for a medical student who tested positive. Changing laws legalizing certain drugs may require corresponding changes in the focus on drug testing and associated issues in medical training; however, many residency program directors were not aware of their institution's current policies. Programs will need to reexamine drug testing policies as new generations of physicians, growing up under altered legal circumstances concerning drug use, progress to clinical training.

  11. Light Water Reactor Sustainability Program: Evaluation of Localized Cable Test Methods for Nuclear Power Plant Cable Aging Management Programs

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Glass, Samuel W.; Fifield, Leonard S.; Hartman, Trenton S.

    This Pacific Northwest National Laboratory (PNNL) milestone report describes progress to date on the investigation of nondestructive test (NDE) methods focusing particularly on local measurements that provide key indicators of cable aging and damage. The work includes a review of relevant literature as well as hands-on experimental verification of inspection capabilities. As NPPs consider applying for second, or subsequent, license renewal (SLR) to extend their operating period from 60 years to 80 years, it important to understand how the materials installed in plant systems and components will age during that time and develop aging management programs (AMPs) to assure continuedmore » safe operation under normal and design basis events (DBE). Normal component and system tests typically confirm the cables can perform their normal operational function. The focus of the cable test program is directed toward the more demanding challenge of assuring the cable function under accident or DBE. Most utilities already have a program associated with their first life extension from 40 to 60 years. Regrettably, there is neither a clear guideline nor a single NDE that can assure cable function and integrity for all cables. Thankfully, however, practical implementation of a broad range of tests allows utilities to develop a practical program that assures cable function to a high degree. The industry has adopted 50% elongation at break (EAB) relative to the un-aged cable condition as the acceptability standard. All tests are benchmarked against the cable EAB test. EAB is a destructive test so the test programs must apply an array of other NDE tests to assure or infer the overall set of cable’s system integrity. These cable NDE programs vary in rigor and methodology. As the industry gains experience with the efficacy of these programs, it is expected that implementation practice will converge to a more common approach. This report addresses the range of local NDE cable tests that are or could be practically implemented in a field test situation. These tests include: visual, infrared thermography, interdigital capacitance, indenter, relaxation time indenter, dynamic mechanical analyzer, infrared/near-infrared spectrometry, ultrasound, and distributed fiber optic temperature measurement.« less

  12. 14 CFR 120.101 - Scope.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... OPERATORS FOR COMPENSATION OR HIRE: CERTIFICATION AND OPERATIONS DRUG AND ALCOHOL TESTING PROGRAM Drug Testing Program Requirements § 120.101 Scope. This subpart contains the standards and components that must be included in a drug testing program required by this part. ...

  13. 14 CFR 120.101 - Scope.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... OPERATORS FOR COMPENSATION OR HIRE: CERTIFICATION AND OPERATIONS DRUG AND ALCOHOL TESTING PROGRAM Drug Testing Program Requirements § 120.101 Scope. This subpart contains the standards and components that must be included in a drug testing program required by this part. ...

  14. 14 CFR 120.101 - Scope.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... OPERATORS FOR COMPENSATION OR HIRE: CERTIFICATION AND OPERATIONS DRUG AND ALCOHOL TESTING PROGRAM Drug Testing Program Requirements § 120.101 Scope. This subpart contains the standards and components that must be included in a drug testing program required by this part. ...

  15. 14 CFR 120.101 - Scope.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... OPERATORS FOR COMPENSATION OR HIRE: CERTIFICATION AND OPERATIONS DRUG AND ALCOHOL TESTING PROGRAM Drug Testing Program Requirements § 120.101 Scope. This subpart contains the standards and components that must be included in a drug testing program required by this part. ...

  16. 14 CFR 120.101 - Scope.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... OPERATORS FOR COMPENSATION OR HIRE: CERTIFICATION AND OPERATIONS DRUG AND ALCOHOL TESTING PROGRAM Drug Testing Program Requirements § 120.101 Scope. This subpart contains the standards and components that must be included in a drug testing program required by this part. ...

  17. 75 FR 65517 - Canadian Standards Association; Expansion of Recognition

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-25

    ... Nationally Recognized Testing Laboratory (NRTL). CSA's expansion covers the use of additional test standards...) The type of products the NRTL may test, with each type specified by its applicable test standard; (2... activities for test standards within the NRTL's scope; and (3) the supplemental program(s) that the NRTL may...

  18. 76 FR 65631 - Energy Conservation Program: Test Procedures for Microwave Ovens

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-24

    ... Conservation Program: Test Procedures for Microwave Ovens AGENCY: Office of Energy Efficiency and Renewable... (DOE) has initiated a test procedure rulemaking to develop active mode testing methodologies for... Federal Register a final rule for the microwave oven test procedure rulemaking (July TP repeal final rule...

  19. 78 FR 63823 - Energy Conservation Program: Test Procedures for Television Sets

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-25

    ... Conservation Program: Test Procedures for Television Sets AGENCY: Office of Energy Efficiency and Renewable... Energy (DOE) issued a notice of proposed rulemaking (NOPR) to establish a new test procedure for... additional testing and proposed amendments to the TV test procedure in its March 12, 2013 supplemental notice...

  20. 76 FR 50145 - Energy Conservation Program: Test Procedures for Residential Clothes Dryers

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-12

    ... EERE-2011-BT-TP-0054] RIN 1904-AC63 Energy Conservation Program: Test Procedures for Residential...: Request for information. SUMMARY: The U.S. Department of Energy (DOE) has initiated a test procedure... clothes dryer test procedure. DOE will address the issues surrounding testing of automatic cycle...

  1. 78 FR 62488 - Energy Conservation Program: Compliance Date for the Dehumidifier Test Procedure

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-22

    ... Conservation Program: Compliance Date for the Dehumidifier Test Procedure AGENCY: Office of Energy Efficiency.... Department of Energy (DOE) proposes to revise the compliance date for the dehumidifier test procedures... manufacturers to test using only the active mode provisions in the test procedure for dehumidifiers currently...

  2. Optimal Assembly of Psychological and Educational Tests.

    ERIC Educational Resources Information Center

    van der Linden, Wim J.

    1998-01-01

    Reviews optimal test-assembly literature and introduces the contributions to this special issue. Discusses four approaches to computerized test assembly: (1) heuristic-based test assembly; (2) 0-1 linear programming; (3) network-flow programming; and (4) an optimal design approach. Contains a bibliography of 90 sources on test assembly.…

  3. 14 CFR 120.107 - Substances for which testing must be conducted.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... TRANSPORTATION (CONTINUED) AIR CARRIERS AND OPERATORS FOR COMPENSATION OR HIRE: CERTIFICATION AND OPERATIONS DRUG AND ALCOHOL TESTING PROGRAM Drug Testing Program Requirements § 120.107 Substances for which testing... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Substances for which testing must be...

  4. 14 CFR 120.107 - Substances for which testing must be conducted.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... TRANSPORTATION (CONTINUED) AIR CARRIERS AND OPERATORS FOR COMPENSATION OR HIRE: CERTIFICATION AND OPERATIONS DRUG AND ALCOHOL TESTING PROGRAM Drug Testing Program Requirements § 120.107 Substances for which testing... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Substances for which testing must be...

  5. 14 CFR 120.107 - Substances for which testing must be conducted.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... TRANSPORTATION (CONTINUED) AIR CARRIERS AND OPERATORS FOR COMPENSATION OR HIRE: CERTIFICATION AND OPERATIONS DRUG AND ALCOHOL TESTING PROGRAM Drug Testing Program Requirements § 120.107 Substances for which testing... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Substances for which testing must be...

  6. 14 CFR 120.107 - Substances for which testing must be conducted.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... TRANSPORTATION (CONTINUED) AIR CARRIERS AND OPERATORS FOR COMPENSATION OR HIRE: CERTIFICATION AND OPERATIONS DRUG AND ALCOHOL TESTING PROGRAM Drug Testing Program Requirements § 120.107 Substances for which testing... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Substances for which testing must be...

  7. 14 CFR 120.107 - Substances for which testing must be conducted.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... TRANSPORTATION (CONTINUED) AIR CARRIERS AND OPERATORS FOR COMPENSATION OR HIRE: CERTIFICATION AND OPERATIONS DRUG AND ALCOHOL TESTING PROGRAM Drug Testing Program Requirements § 120.107 Substances for which testing... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Substances for which testing must be...

  8. Contractor point of view for system development and test program

    NASA Technical Reports Server (NTRS)

    Koide, F. K.; Ringer, D. E.; Earl, C. E.

    1981-01-01

    Industry's practice of testing space qualified hardware is examined. An overview of the Global Positioning System (GPS) Test Program is discussed from the component level to the sub-system compatibility tests with the space vehicle and finally to the launch site tests, all related to the Rubidium clock.

  9. The role of physicians as medical review officers in workplace drug testing programs. In pursuit of the last nanogram.

    PubMed Central

    Clark, H W

    1990-01-01

    In discussing the role of physicians in workplace drug testing programs, I focus on the recent Department of Transportation regulations that require drug testing in such regulated industries as interstate trucking, air transportation, mass transit, and the railroads. These regulations require that applicable drug testing programs employ physicians as medical review officers to evaluate positive tests that have been screened and confirmed by different techniques to determine if there is a legal medical explanation for the result. The drug testing program tests for the presence of amphetamine, cocaine, tetrahydrocannabinol, opiates, and phencyclidine. If an employee testing positive has an acceptable medical explanation, the result is to be reported as negative. Little practical advice exists for medical review officers, and they must be aware of key elements of the regulations and potential trouble spots. PMID:2190419

  10. High-Frequency Axial Fatigue Test Procedures for Spectrum Loading

    DTIC Science & Technology

    2016-07-20

    histories can be performed at frequencies much higher than standard servo-hydraulic test frames by using a test frame that is optimized to run at higher...by using a test frame that is optimized to run at higher frequencies. AIR 4.3 has conducted a research program to develop a test capability for...Applied Research (BAR) program (219BAR-10-008) was initiated in 2010. The program investigated the influence of a generic rotorcraft main rotor blade root

  11. Employee Drug Testing. A Single Agency is Needed to Manage Federal Employee Drug Testing

    DTIC Science & Technology

    1991-02-19

    The executive order requires the head of each executive agency to establish a program to test employees in sensitive positions for the use of illegal...that although several agencies were responsible for helping to design employee drug testing programs , there is no federal agency responsible for... EMPLOYEES ARE NOT BEING TREATED EQUITABLY Because the head of each agency is responsible for implementing a drug testing program , the extent to which

  12. Space station structures and dynamics test program

    NASA Technical Reports Server (NTRS)

    Moore, Carleton J.; Townsend, John S.; Ivey, Edward W.

    1987-01-01

    The design, construction, and operation of a low-Earth orbit space station poses unique challenges for development and implementation of new technology. The technology arises from the special requirement that the station be built and constructed to function in a weightless environment, where static loads are minimal and secondary to system dynamics and control problems. One specific challenge confronting NASA is the development of a dynamics test program for: (1) defining space station design requirements, and (2) identifying the characterizing phenomena affecting the station's design and development. A general definition of the space station dynamic test program, as proposed by MSFC, forms the subject of this report. The test proposal is a comprehensive structural dynamics program to be launched in support of the space station. The test program will help to define the key issues and/or problems inherent to large space structure analysis, design, and testing. Development of a parametric data base and verification of the math models and analytical analysis tools necessary for engineering support of the station's design, construction, and operation provide the impetus for the dynamics test program. The philosophy is to integrate dynamics into the design phase through extensive ground testing and analytical ground simulations of generic systems, prototype elements, and subassemblies. On-orbit testing of the station will also be used to define its capability.

  13. Fan Blade Shake Test Results for the 40- by 80-/80- by 120-Foot Wind Tunnel

    NASA Technical Reports Server (NTRS)

    Warmbrodt, W.; Graham, T.

    1983-01-01

    This report documents the shake tests performed on the first set of hydulignum fan blades for the 40- by 80-/80- by 120-Foot Wind Tunnel. The purpose of the shake test program is described. The test equipment and test procedures are reviewed. Results from each shake test are presented and the overall findings of the shake test program are discussed.

  14. Test effectiveness study report: An analytical study of system test effectiveness and reliability growth of three commercial spacecraft programs

    NASA Technical Reports Server (NTRS)

    Feldstein, J. F.

    1977-01-01

    Failure data from 16 commercial spacecraft were analyzed to evaluate failure trends, reliability growth, and effectiveness of tests. It was shown that the test programs were highly effective in ensuring a high level of in-orbit reliability. There was only a single catastrophic problem in 44 years of in-orbit operation on 12 spacecraft. The results also indicate that in-orbit failure rates are highly correlated with unit and systems test failure rates. The data suggest that test effectiveness estimates can be used to guide the content of a test program to ensure that in-orbit reliability goals are achieved.

  15. EVALUATION OF THE WEIGHT-BASED COLLECTION PROJECT IN FARMINGTON, MINNESOTA: A MITE PROGRAM EVALUATION

    EPA Science Inventory

    This project evaluates a test program of a totally automated weight-based refuse disposal rate system. his test program was conducted by the City of Farmington, Minnesota between 1991 and 1993. he intent of the program was to test a mechanism which would automatically assess a fe...

  16. Emergency department patient perceptions and preferences on opt-in rapid HIV screening program components

    PubMed Central

    Merchant, Roland C.; Clark, Melissa A.; Seage, George R.; Mayer, Kenneth H.; DeGruttola, Victor G.; Becker, Bruce M.

    2011-01-01

    The aim of this investigation was to assess emergency department (ED) patients’ perceptions and preferences about an opt-in, universal, rapid HIV screening program and identify patient groups who expressed stronger beliefs about components of the testing program. From July 2005 to July 2006, ED patients in the opt-in, universal, rapid HIV screening program were interviewed in person. Multivariable regression models were used to compare participants on their beliefs about the program components. Of the 561 participants, 62.0% had previously been tested for HIV. The majority of participants (58.8%) believed the rapid and standard/conventional HIV tests to be equally accurate, 27.7% believed the rapid test to be less or much less accurate, and 8.7% believed the rapid test to be more or much more accurate. Almost two-thirds (65.1%) favored having a rapid instead of a standard/conventional HIV test, 94.6% wanted the test results within one hour, and 61.3% would be likely or very likely to undergo testing in the ED if it prolonged their ED visit. Almost all (92.5%) believed that their medical care was “not at all” delayed because of being tested, 94.1% believed that testing did “not at all” divert attention from the reason for their ED visit, and 80.9% thought that testing in the ED was “not at all” stressful. In multivariable logistic regression models, males and those with more than 12 years of formal education showed greater concerns about the rapid HIV test’s accuracy. Hispanic/Latinos, participants with governmental insurance, and those previously HIV tested were more apt to be screened for HIV even if testing delayed their ED departure. Overall, participants were highly accepting of the components of this opt-in rapid HIV screening program. However, concerns regarding the accuracy of the rapid HIV test might limit test acceptance and should be addressed during pre-test information procedures. PMID:19283644

  17. Payload test philosophy. [to provide confidence in Shuttle structural math models

    NASA Technical Reports Server (NTRS)

    Mayhew, D.

    1979-01-01

    Shuttle payload test philosophy is discussed with reference to testing to provide confidence in Shuttle structural math models. Particular attention is given the Shuttle quarter-scale program and the Mated Vertical Ground Vibration Test Program.

  18. Implementation of Wireless and Intelligent Sensor Technologies in the Propulsion Test Environment

    NASA Technical Reports Server (NTRS)

    Solano, Wanda M.; Junell, Justin C.; Shumard, Kenneth

    2003-01-01

    From the first Saturn V rocket booster (S-II-T) testing in 1966 and the routine Space Shuttle Main Engine (SSME) testing beginning in 1975, to more recent test programs such as the X-33 Aerospike Engine, the Integrated Powerhead Development (IPD) program, and the Hybrid Sounding Rocket (HYSR), Stennis Space Center (SSC) continues to be a premier location for conducting large-scale propulsion testing. Central to each test program is the capability for sensor systems to deliver reliable measurements and high quality data, while also providing a means to monitor the test stand area to the highest degree of safety and sustainability. As part of an on-going effort to enhance the testing capabilities of Stennis Space Center, the Test Technology and Development group is developing and applying a number of wireless and intelligent sensor technologies in ways that are new to the test existing test environment.

  19. Anonymous or confidential HIV counseling and voluntary testing in federally funded testing sites--United States, 1995-1997.

    PubMed

    1999-06-25

    Human immunodeficiency virus (HIV) counseling and voluntary testing (CT) programs have been an important part of national HIV prevention efforts since the first HIV antibody tests became available in 1985. In 1995, these programs accounted for approximately 15% of annual HIV antibody testing in the United States, excluding testing for blood donation. CT opportunities are offered to persons at risk for HIV infection at approximately 11,000 sites, including dedicated HIV CT sites, sexually transmitted disease (STD) clinics, drug-treatment centers, hospitals, and prisons. In 39 states, testing can be obtained anonymously, where persons do not have to give their name to get tested. All states provide confidential testing (by name) and have confidentiality laws and regulations to protect this information. This report compares patterns of anonymous and confidential testing in all federally funded CT programs from 1995 through 1997 and documents the importance of both types of testing opportunities.

  20. Relocation of the Cryo-Test Facility to NASA-MSFC

    NASA Technical Reports Server (NTRS)

    Sisco, Jimmy D.; McConnaughey, Paul K. (Technical Monitor)

    2002-01-01

    The Environmental Test Facility (ETF), located at NASA-Marshall Space Flight Center, Huntsville, Alabama, has provided thermal vacuum testing for several major programs since the 1960's. The ETF consists of over 13 thermal vacuum chambers sized and configured to handle the majority of test payloads. Testing is performed around the clock with multiple tests being conducted simultaneously. Chamber selection to achieve the best match with test articles and juggling program schedules, at times, can be a challenge. The ETF's Sunspot chamber has had tests scheduled and operated back-to-back for several years and provides the majority of schedule conflicts. Future test programs have been identified which surpass the current Sunspot availability. This paper describes a very low cost alternate to reduce schedule conflicts by utilizing government excess equipment

  1. Techniques for hot structures testing

    NASA Technical Reports Server (NTRS)

    Deangelis, V. Michael; Fields, Roger A.

    1990-01-01

    Hot structures testing have been going on since the early 1960's beginning with the Mach 6, X-15 airplane. Early hot structures test programs at NASA-Ames-Dryden focused on operational testing required to support the X-15 flight test program, and early hot structures research projects focused on developing lab test techniques to simulate flight thermal profiles. More recent efforts involved numerous large and small hot structures test programs that served to develop test methods and measurement techniques to provide data that promoted the correlation of test data with results from analytical codes. In Nov. 1988 a workshop was sponsored that focused on the correlation of hot structures test data with analysis. Limited material is drawn from the workshop and a more formal documentation is provided of topics that focus on hot structures test techniques used at NASA-Ames-Dryden. Topics covered include the data acquisition and control of testing, the quartz lamp heater systems, current strain and temperature sensors, and hot structures test techniques used to simulate the flight thermal environment in the lab.

  2. A Survey of Research Performed at NASA Langley Research Center's Impact Dynamics Research Facility

    NASA Technical Reports Server (NTRS)

    Jackson, K. E.; Fasanella, E. L.

    2003-01-01

    The Impact Dynamics Research Facility (IDRF) is a 240-ft-high gantry structure located at NASA Langley Research Center in Hampton, Virginia. The facility was originally built in 1963 as a lunar landing simulator, allowing the Apollo astronauts to practice lunar landings under realistic conditions. The IDRF was designated a National Historic Landmark in 1985 based on its significant contributions to the Apollo Program. In 1972, the facility was converted to a full-scale crash test facility for light aircraft and rotorcraft. Since that time, the IDRF has been used to perform a wide variety of impact tests on full-scale aircraft and structural components in support of the General Aviation (GA) aircraft industry, the US Department of Defense, the rotorcraft industry, and NASA in-house aeronautics and space research programs. The objective of this paper is to describe most of the major full-scale crash test programs that were performed at this unique, world-class facility since 1974. The past research is divided into six sub-topics: the civil GA aircraft test program, transport aircraft test program, military test programs, space test programs, basic research, and crash modeling and simulation.

  3. Results of the recent precipitation static flight test program on the Navy P-3B antisubmarine aircraft

    NASA Technical Reports Server (NTRS)

    Whitaker, Mike

    1991-01-01

    Severe precipitation static problems affecting the communication equipment onboard the P-3B aircraft were recently studied. The study was conducted after precipitation static created potential safety-of-flight problems on Naval Reserve aircraft. A specially designed flight test program was conducted in order to measure, record, analyze, and characterize potential precipitation static problem areas. The test program successfully characterized the precipitation static interference problems while the P-3B was flown in moderate to extreme precipitation conditions. Data up to 400 MHz were collected on the effects of engine charging, precipitation static, and extreme cross fields. These data were collected using a computer controlled acquisition system consisting of a signal generator, RF spectrum and audio analyzers, data recorders, and instrumented static dischargers. The test program is outlined and the computer controlled data acquisition system is described in detail which was used during flight and ground testing. The correlation of test results is also discussed which were recorded during the flight test program and those measured during ground testing.

  4. 77 FR 36550 - Office of Clinical and Preventive Services Funding Opportunity: National HIV Program for Enhanced...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-19

    ... Disease Control and Prevention (CDC) guidelines, provide pre- and post-test counseling (when indicated... existing public health statutes. Test at least one previously untested (not tested in the prior five years... their test results, particularly clients who test positive. ii. Describe how the program will ensure...

  5. 77 FR 24480 - Application for New Awards; Advanced Placement (AP) Test Fee Program-Reopening the AP Test Fee...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-24

    ... DEPARTMENT OF EDUCATION Application for New Awards; Advanced Placement (AP) Test Fee Program--Reopening the AP Test Fee Fiscal Year 2012 Competition AGENCY: Office of Elementary and Secondary Education (OESE), Department of Education. ACTION: Notice reopening the AP Test Fee fiscal year 2012 competition...

  6. Proof test criteria for thin-walled 2219 aluminum pressure vessels. Volume 1: Program summary and data analysis

    NASA Technical Reports Server (NTRS)

    Finger, R. W.

    1976-01-01

    This experimental program was undertaken to investigate the crack growth behavior of deep surface flaws in 2219 aluminum. The program included tests of uniaxially loaded surface flaw and center crack panels at temperatures ranging from 20K (-423 F) to ambient. The tests were conducted on both the base metal and as-welded weld metal material. The program was designed to provide data on the mechanisms of failure by ligament penetration, and the residual cyclic life, after proof-testing, of a vessel which has been subjected to incipient penetration by the proof test. The results were compared and analyzed with previously developed data to develop guidelines for the proof testing of thin walled 2219 pressure vessels.

  7. Effectiveness of gratitude disposition promotion program on depression and quality of life of chronic schizophrenic patients.

    PubMed

    Jung, Miran; Han, Kuemsun

    2017-01-01

    Gratitude intervention is expectedly an effective intervention to reduce depression and improve the quality of life in schizophrenic patients, but there is a lack of literature on it. We attempted to develop and test the effectiveness of the gratitude disposition promotion program for chronic schizophrenic patients in Korea. Nonequivalent control group pre- and post-test design was used in two mental health centers located at Gyeonggi-do in South Korea. This paper was a quasi-experimental study and the participants who took part in the gratitude disposition promotion program were 17 of experimental group and 15 of control group. Gratitude disposition (the short gratitude, resentment, and appreciation test), depression (Beck Depression Inventory), and quality of life (developed by Kook) of chronic schizophrenic patients were measured before and after an intervention, as compared to the control. Chi-square test, Fisher's exact test, and t -test were performed for prehomogeneity testing for variables related to the general characteristics. Testing for the effectiveness of gratitude disposition promotion program and hypothesis testing for its effect on depression and quality of life were by ANCOVA and t -test, as verified to significance level of P < 0.05. The participants who received the gratitude disposition promotion program showed significant improvements in gratitude disposition ( F = 18.740, P < 0.0001) and in quality of life ( F = 9.800, P = 0.004), but no significant difference in depression ( F = 3.870, P = 0.059). The gratitude disposition promotion program was an effective clinical intervention program for enhancing gratitude disposition and quality of life of chronic schizophrenic patients in community.

  8. Effectiveness of spacecraft testing programs

    NASA Technical Reports Server (NTRS)

    Krausz, A.

    1980-01-01

    The need for testing under simulated mission operational conditions is discussed and the results of such tests are reviewed from the point of view of the user. A brief overview of the usal test sequences for high reliability long life spacecraft is presented and the effectiveness of the testing program is analyzed in terms of the defects which are discovered by such tests. The need for automation, innovative mechanical test procedures, and design for testability is discussed.

  9. RLV/X-33 operations overview

    NASA Astrophysics Data System (ADS)

    Black, Stephen T.; Eshleman, Wally

    1997-01-01

    This paper describes the VentureStar™ SSTO RLV and X-33 operations concepts. Applications of advanced technologies, automated ground support systems, advanced aircraft and launch vehicle lessons learned have been integrated to develop a streamlined vehicle and mission processing concept necessary to meet the goals of a commercial SSTO RLV. These concepts will be validated by the X-33 flight test program where financial and technical risk mitigation are required. The X-33 flight test program totally demonstrates the vehicle performance, technology, and efficient ground operations at the lowest possible cost. The Skunk Work's test program approach and test site proximity to the production plant are keys. The X-33 integrated flight and ground test program incrementally expands the knowledge base of the overall system allowing minimum risk progression to the next flight test program milestone. Subsequent X-33 turnaround processing flows will be performed with an aircraft operations philosophy. The differences will be based on research and development, component reliability and flight test requirements.

  10. USL/DBMS NASA/PC R and D project system testing standards

    NASA Technical Reports Server (NTRS)

    Dominick, Wayne D. (Editor); Kavi, Srinu; Moreau, Dennis R.; Yan, Lin

    1984-01-01

    A set of system testing standards to be used in the development of all C software within the NASA/PC Research and Development Project is established. Testing will be considered in two phases: the program testing phase and the system testing phase. The objective of these standards is to provide guidelines for the planning and conduct of program and software system testing.

  11. Documentation of CTRS--Computerized Test-Result Reporting System. The Illinois Series on Educational Application of Computers, No. 22e.

    ERIC Educational Resources Information Center

    Muiznieks, Viktors J.; Cox, John

    The Computerized Test-Result Reporting System (CTRS), which consists of three programs written in the BASIC language, was developed to analyze obective tests, test items, test results, and to provide the teacher-user with interpreted data about the performance of tests, Lest items, and students. This paper documents the three programs from the…

  12. Reusable Launch Vehicle Technology Program

    NASA Technical Reports Server (NTRS)

    Freeman, Delma C., Jr.; Talay, Theodore A.; Austin, R. Eugene

    1996-01-01

    Industry/NASA Reusable Launch Vehicle (RLV) Technology Program efforts are underway to design, test, and develop technologies and concepts for viable commercial launch systems that also satisfy national needs at acceptable recurring costs. Significant progress has been made in understanding the technical challenges of fully reusable launch systems and the accompanying management and operational approaches for achieving a low-cost program. This paper reviews the current status of the Reusable Launch Vehicle Technology Program including the DC-XA, X-33 and X-34 flight systems and associated technology programs. It addresses the specific technologies being tested that address the technical and operability challenges of reusable launch systems including reusable cryogenic propellant tanks, composite structures, thermal protection systems, improved propulsion, and subsystem operability enhancements. The recently concluded DC-XA test program demonstrated some of these technologies in ground and flight tests. Contracts were awarded recently for both the X-33 and X-34 flight demonstrator systems. The Orbital Sciences Corporation X-34 flight test vehicle will demonstrate an air-launched reusable vehicle capable of flight to speeds of Mach 8. The Lockheed-Martin X-33 flight test vehicle will expand the test envelope for critical technologies to flight speeds of Mach 15. A propulsion program to test the X-33 linear aerospike rocket engine using a NASA SR-71 high speed aircraft as a test bed is also discussed. The paper also describes the management and operational approaches that address the challenge of new cost-effective, reusable launch vehicle systems.

  13. Apollo experience report: Electronic systems test program accomplishments and results

    NASA Technical Reports Server (NTRS)

    Ohnesorge, T. E.

    1972-01-01

    A chronological record is presented of the Electronic Systems Test Program from its conception in May 1963 to December 1969. The original concept of the program, which was primarily a spacecraft/Manned Space Flight Network communications system compatibility and performance evaluation, is described. The evolution of these concepts to include various levels of test detail, as well as systems level design verification testing, is discussed. Actual implementation of these concepts is presented, and the facility to support the program is described. Test results are given, and significant contributions to the lunar landing mission are underlined. Plans for modifying the facility and the concepts, based on Apollo experience, are proposed.

  14. Combined Loads Test Fixture for Thermal-Structural Testing Aerospace Vehicle Panel Concepts

    NASA Technical Reports Server (NTRS)

    Fields, Roger A.; Richards, W. Lance; DeAngelis, Michael V.

    2004-01-01

    A structural test requirement of the National Aero-Space Plane (NASP) program has resulted in the design, fabrication, and implementation of a combined loads test fixture. Principal requirements for the fixture are testing a 4- by 4-ft hat-stiffened panel with combined axial (either tension or compression) and shear load at temperatures ranging from room temperature to 915 F, keeping the test panel stresses caused by the mechanical loads uniform, and thermal stresses caused by non-uniform panel temperatures minimized. The panel represents the side fuselage skin of an experimental aerospace vehicle, and was produced for the NASP program. A comprehensive mechanical loads test program using the new test fixture has been conducted on this panel from room temperature to 500 F. Measured data have been compared with finite-element analyses predictions, verifying that uniform load distributions were achieved by the fixture. The overall correlation of test data with analysis is excellent. The panel stress distributions and temperature distributions are very uniform and fulfill program requirements. This report provides details of an analytical and experimental validation of the combined loads test fixture. Because of its simple design, this unique test fixture can accommodate panels from a variety of aerospace vehicle designs.

  15. Advanced very high resolution radiometer

    NASA Technical Reports Server (NTRS)

    1976-01-01

    The advanced very high resolution radiometer development program is considered. The program covered the design, construction, and test of a breadboard model, engineering model, protoflight model, mechanical structural model, and a life test model. Special bench test and calibration equipment was also developed for use on the program.

  16. 47 CFR 73.713 - Program tests.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 4 2014-10-01 2014-10-01 false Program tests. 73.713 Section 73.713 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES RADIO BROADCAST SERVICES International Broadcast Stations § 73.713 Program tests. (a) Upon completion of construction of an international broadcasting station in...

  17. 14 CFR 120.211 - Applicable Federal regulations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Transportation Workplace Drug Testing Programs (b) 14 CFR: (1) § 67.107—First-Class Airman Medical Certificate... (CONTINUED) AIR CARRIERS AND OPERATORS FOR COMPENSATION OR HIRE: CERTIFICATION AND OPERATIONS DRUG AND ALCOHOL TESTING PROGRAM Alcohol Testing Program Requirements § 120.211 Applicable Federal regulations. The...

  18. 14 CFR 120.211 - Applicable Federal regulations.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Transportation Workplace Drug Testing Programs (b) 14 CFR: (1) § 67.107—First-Class Airman Medical Certificate... (CONTINUED) AIR CARRIERS AND OPERATORS FOR COMPENSATION OR HIRE: CERTIFICATION AND OPERATIONS DRUG AND ALCOHOL TESTING PROGRAM Alcohol Testing Program Requirements § 120.211 Applicable Federal regulations. The...

  19. 14 CFR 120.211 - Applicable Federal regulations.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Transportation Workplace Drug Testing Programs (b) 14 CFR: (1) § 67.107—First-Class Airman Medical Certificate... (CONTINUED) AIR CARRIERS AND OPERATORS FOR COMPENSATION OR HIRE: CERTIFICATION AND OPERATIONS DRUG AND ALCOHOL TESTING PROGRAM Alcohol Testing Program Requirements § 120.211 Applicable Federal regulations. The...

  20. 14 CFR 120.211 - Applicable Federal regulations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Transportation Workplace Drug Testing Programs (b) 14 CFR: (1) § 67.107—First-Class Airman Medical Certificate... (CONTINUED) AIR CARRIERS AND OPERATORS FOR COMPENSATION OR HIRE: CERTIFICATION AND OPERATIONS DRUG AND ALCOHOL TESTING PROGRAM Alcohol Testing Program Requirements § 120.211 Applicable Federal regulations. The...

  1. 14 CFR 120.211 - Applicable Federal regulations.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Transportation Workplace Drug Testing Programs (b) 14 CFR: (1) § 67.107—First-Class Airman Medical Certificate... (CONTINUED) AIR CARRIERS AND OPERATORS FOR COMPENSATION OR HIRE: CERTIFICATION AND OPERATIONS DRUG AND ALCOHOL TESTING PROGRAM Alcohol Testing Program Requirements § 120.211 Applicable Federal regulations. The...

  2. Systems design study of the Pioneer Venus spacecraft. Volume 2. Preliminary program development plan

    NASA Technical Reports Server (NTRS)

    1973-01-01

    The preliminary development plan for the Pioneer Venus program is presented. This preliminary plan treats only developmental aspects that would have a significant effect on program cost. These significant development areas were: master program schedule planning; test planning - both unit and system testing for probes/orbiter/ probe bus; ground support equipment; performance assurance; and science integration Various test planning options and test method techniques were evaluated in terms of achieving a low-cost program without degrading mission performance or system reliability. The approaches studied and the methodology of the selected approach are defined.

  3. Air Force Phillips Laboratory Battery Program overview

    NASA Technical Reports Server (NTRS)

    House, Shaun

    1992-01-01

    Battery development and testing efforts at Phillips Laboratory fall into three main categories: nickel hydrogen, sodium sulfur, and solid state batteries. Nickel hydrogen work is broken down into a Low Earth Orbit (LEO) Life Test Program, a LEO Pulse Test Program, and a Hydrogen Embrittlement Investigation. Sodium sulfur work is broken down into a Geosynchronous Earth Orbit (GEO) Battery Flight Test and a Hot Launch Evaluation. Solid state polymer battery work consists of a GEO Battery Development Program, a Pulse Power Battery Small Business Innovation Research (SBIR), and an in-house evaluation of current generation laboratory cells. An overview of the program is presented.

  4. Technology demonstrator program for Space Station Environmental Control Life Support System

    NASA Technical Reports Server (NTRS)

    Adams, Alan M.; Platt, Gordon K.; Claunch, William C.; Humphries, William R.

    1987-01-01

    The main objectives and requirements of the NASA/Marshall Space Flight Center Technology Demonstration Program are discussed. The program consists of a comparative test and a 90-day manned system test to evaluate an Environmental Control and Life Support System (ECLSS). In the comparative test phase, 14 types of subsystems which perform oxygen and water reclamation functions are to be examined in terms of performance maintenance/service requirements, reliability, and safety. The manned chamber testing phase involves a four person crew using a partial ECLSS for 90 days. The schedule for the program and the program hardware requirements are described.

  5. Strategies for Ground Based Testing of Manned Lunar Surface Systems

    NASA Technical Reports Server (NTRS)

    Beyer, Jeff; Peacock, Mike; Gill, Tracy

    2009-01-01

    Integrated testing (such as Multi-Element Integrated Test (MEIT)) is critical to reducing risks and minimizing problems encountered during assembly, activation, and on-orbit operation of large, complex manned spacecraft. Provides the best implementation of "Test Like You Fly:. Planning for integrated testing needs to begin at the earliest stages of Program definition. Program leadership needs to fully understand and buy in to what integrated testing is and why it needs to be performed. As Program evolves and design and schedules mature, continually look for suitable opportunities to perform testing where enough components are together in one place at one time. The benefits to be gained are well worth the costs.

  6. Halogen occultation experiment intergrated test plan

    NASA Technical Reports Server (NTRS)

    Mauldin, L. E., III; Butterfield, A. J.

    1986-01-01

    The test program plan is presented for the Halogen Occultation Experiment (HALOE) instrument, which is being developed in-house at the Langley Research Center for the Upper Atmosphere Research Satellite (UARS). This comprehensive test program was developed to demonstrate that the HALOE instrument meets its performance requirements and maintains integrity through UARS flight environments. Each component, subsystem, and system level test is described in sufficient detail to allow development of the necessary test setups and test procedures. Additionally, the management system for implementing this test program is given. The HALOE instrument is a gas correlation radiometer that measures vertical distribution of eight upper atmospheric constituents: O3, HC1, HF, NO, CH4, H2O, NO2, and CO2.

  7. Accelerated test design

    NASA Technical Reports Server (NTRS)

    Mcdermott, P. P.

    1980-01-01

    The design of an accelerated life test program for electric batteries is discussed. A number of observations and suggestions on the procedures and objectives for conducting an accelerated life test program are presented. Equations based on nonlinear regression analysis for predicting the accelerated life test parameters are discussed.

  8. 77 FR 48527 - National Customs Automation Program (NCAP) Test Concerning Automated Commercial Environment (ACE...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-14

    ... Program (NCAP) Test Concerning Automated Commercial Environment (ACE) Simplified Entry: Modification of... Automated Commercial Environment (ACE). The test's participant selection criteria are modified to reflect... (NCAP) test concerning Automated Commercial Environment (ACE) Simplified Entry functionality (Simplified...

  9. 15 CFR 285.8 - Proficiency testing.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 15 Commerce and Foreign Trade 1 2012-01-01 2012-01-01 false Proficiency testing. 285.8 Section 285... OF STANDARDS AND TECHNOLOGY, DEPARTMENT OF COMMERCE ACCREDITATION AND ASSESSMENT PROGRAMS NATIONAL VOLUNTARY LABORATORY ACCREDITATION PROGRAM § 285.8 Proficiency testing. (a) NVLAP proficiency testing is...

  10. 15 CFR 285.8 - Proficiency testing.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 15 Commerce and Foreign Trade 1 2014-01-01 2014-01-01 false Proficiency testing. 285.8 Section 285... OF STANDARDS AND TECHNOLOGY, DEPARTMENT OF COMMERCE ACCREDITATION AND ASSESSMENT PROGRAMS NATIONAL VOLUNTARY LABORATORY ACCREDITATION PROGRAM § 285.8 Proficiency testing. (a) NVLAP proficiency testing is...

  11. 15 CFR 285.8 - Proficiency testing.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 15 Commerce and Foreign Trade 1 2013-01-01 2013-01-01 false Proficiency testing. 285.8 Section 285... OF STANDARDS AND TECHNOLOGY, DEPARTMENT OF COMMERCE ACCREDITATION AND ASSESSMENT PROGRAMS NATIONAL VOLUNTARY LABORATORY ACCREDITATION PROGRAM § 285.8 Proficiency testing. (a) NVLAP proficiency testing is...

  12. An Integrated Analysis-Test Approach

    NASA Technical Reports Server (NTRS)

    Kaufman, Daniel

    2003-01-01

    This viewgraph presentation provides an overview of a project to develop a computer program which integrates data analysis and test procedures. The software application aims to propose a new perspective to traditional mechanical analysis and test procedures and to integrate pre-test and test analysis calculation methods. The program also should also be able to be used in portable devices and allows for the 'quasi-real time' analysis of data sent by electronic means. Test methods reviewed during this presentation include: shaker swept sine and random tests, shaker shock mode tests, shaker base driven model survey tests and acoustic tests.

  13. Provision of onsite HIV Services in Substance Use Disorder Treatment Programs: A Longitudinal Analysis.

    PubMed

    Aletraris, Lydia; Roman, Paul M

    2015-10-01

    The provision of HIV education and testing in substance use disorder (SUD) treatment programs is an important public health strategy for reducing HIV incidence. For many at-risk individuals, SUD treatment represents the primary point of access for testing and receiving HIV-related services. This study uses two waves of nationally representative data of 265 privately-funded SUD treatment programs in the U.S. to examine organizational and patient characteristics associated with offering a dedicated HIV/AIDS treatment track, onsite HIV/AIDS support groups, and onsite HIV testing. Our longitudinal analysis indicated that the majority of treatment programs reported providing education and prevention services, but there was a small, yet significant, decline in the number of programs providing these services. Programs placed more of an emphasis on providing information on the transmission of HIV rather than on acquiring risk-reduction skills. There was a notable and significant increase (from 26.0% to 31.7%) in programs that offered onsite HIV testing, including rapid HIV testing, and an increase in the percentage of patients who received testing in the programs. Larger programs were more likely to offer a dedicated HIV/AIDS treatment track and to offer onsite HIV/AIDS support groups, while accredited programs and programs with a medical infrastructure were more likely to provide HIV testing. The percentage of injection drug users was positively linked to the availability of specialized HIV/AIDS tracks and HIV/AIDS support groups, and the percentage of female clients was associated with the availability of onsite support groups. The odds of offering HIV/AIDS support groups were also greater in programs that had a dedicated LGBT track. The findings suggest that access to hospitals and medical care services is an effective way to facilitate adoption of HIV services and that programs are providing a needed service among a group of patients who have a heightened risk of HIV transmission. Nonetheless, the fact that fewer than one third of programs offered onsite testing, and, of the ones that did, fewer than one third of their patients received testing, raises concern in light of federal guidelines. Copyright © 2015 Elsevier Inc. All rights reserved.

  14. Which BRCA genetic testing programs are ready for implementation in health care? A systematic review of economic evaluations.

    PubMed

    D'Andrea, Elvira; Marzuillo, Carolina; De Vito, Corrado; Di Marco, Marco; Pitini, Erica; Vacchio, Maria Rosaria; Villari, Paolo

    2016-12-01

    There is considerable evidence regarding the efficacy and effectiveness of BRCA genetic testing programs, but whether they represent good use of financial resources is not clear. Therefore, we aimed to identify the main health-care programs for BRCA testing and to evaluate their cost-effectiveness. We performed a systematic review of full economic evaluations of health-care programs involving BRCA testing. Nine economic evaluations were included, and four main categories of BRCA testing programs were identified: (i) population-based genetic screening of individuals without cancer, either comprehensive or targeted based on ancestry; (ii) family history (FH)-based genetic screening, i.e., testing individuals without cancer but with FH suggestive of BRCA mutation; (iii) familial mutation (FM)-based genetic screening, i.e., testing individuals without cancer but with known familial BRCA mutation; and (iv) cancer-based genetic screening, i.e., testing individuals with BRCA-related cancers. Currently BRCA1/2 population-based screening represents good value for the money among Ashkenazi Jews only. FH-based screening is potentially very cost-effective, although further studies that include costs of identifying high-risk women are needed. There is no evidence of cost-effectiveness for BRCA screening of all newly diagnosed cases of breast/ovarian cancers followed by cascade testing of relatives, but programs that include tools for identifying affected women at higher risk for inherited forms are promising. Cost-effectiveness is highly sensitive to the cost of BRCA1/2 testing.Genet Med 18 12, 1171-1180.

  15. Low Emissions RQL Flametube Combustor Test Results

    NASA Technical Reports Server (NTRS)

    Chang, Clarence T.; Holdeman, James D.

    2001-01-01

    The overall objective of this test program was to demonstrate and evaluate the capability of the Rich-burn/Quick-mix/Lean-burn (RQL) combustor concept for HSR applications. This test program was in support of the Pratt & Whitney and GE Aircraft Engines HSR low-NOx Combustor Program. Collaborative programs with Parker Hannifin Corporation and Textron Fuel Systems resulted in the development and testing of the high-flow low-NOx rich-burn zone fuel-to-air ratio research fuel nozzles used in this test program. Based on the results obtained in this test program, several conclusions can be made: (1) The RQL tests gave low NOx and CO emissions results at conditions corresponding to HSR cruise. (2) The Textron fuel nozzle design with optimal multiple partitioning of fuel and air circuits shows potential of providing an acceptable uniform local fuel-rich region in the rich burner. (3) For the parameters studied in this test series, the tests have shown T3 is the dominant factor in the NOx formation for RQL combustors. As T3 increases from 600 to 1100 F, EI(NOx) increases approximately three fold. (4) Factors which appear to have secondary influence on NOx formation are P4, T4, infinity(sub rb), V(sub ref,ov). (5) Low smoke numbers were measured for infinity(sub rb) of 2.0 at P4 of 120 psia.

  16. Shout-It-Now: A Mobile HCT Model Employing Technology and Edutainment in South Africa.

    PubMed

    Daniels, Joseph; Komarek, Arnost; Forgreive, Bruce; Pahl, Kathryn; Stafford, Stephen; Bruns, Laurie Campbell; Coates, Thomas

    Mobile HIV counseling and testing (HCT) has been effective in reaching men, women, and adolescents in South Africa. However, there is limited understanding of effective mobile HCT programs utilizing tools like technology and edutainment to increase HIV counseling and testing rates. The authors examine data from the Shout-It-Now (S-N) program that uses such tools in South Africa. The S-N program utilizes various forms of technology and ongoing telephonic counseling within a 6-step program of HIV testing and linkage-to-care support, and program data were analyzed over an 18-month period. Data were analyzed from women, men, and adolescent program participants. Summative statistics was conducted on participant registration, HIV risk assessment, and HIV testing profiles. HIV prevalence were estimated along with the related 95% confidence intervals using the Clopper-Pearson method. Over an 18-month period, there were 72 220 program participants with high representation of men, women, and adolescents and 40% of the participants being men at each site. There were 3343 participants who tested HIV positive, and a higher proportion of women tested positive. Integrating technology, quality assurance measures, and edutainment with mobile HCT has the potential to increase the number of those who test within communities. Research is needed to understand the effectiveness of this model in facilitating regular testing and linkage to care.

  17. An overview of large wind turbine tests by electric utilities

    NASA Technical Reports Server (NTRS)

    Vachon, W. A.; Schiff, D.

    1982-01-01

    A summary of recent plants and experiences on current large wind turbine (WT) tests being conducted by electric utilities is provided. The test programs discussed do not include federal research and development (R&D) programs, many of which are also being conducted in conjunction with electric utilities. The information presented is being assembled in a project, funded by the Electric Power Research Institute (EPRI), the objective of which is to provide electric utilities with timely summaries of test performance on key large wind turbines. A summary of key tests, test instrumentation, and recent results and plans is given. During the past year, many of the utility test programs initiated have encountered test difficulties that required specific WT design changes. However, test results to date continue to indicate that long-term machine performance and cost-effectiveness are achievable.

  18. The Rapid Integration and Test Environment: A Process for Achieving Software Test Acceptance

    DTIC Science & Technology

    2010-05-01

    Test Environment : A Process for Achieving Software Test Acceptance 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S...mlif`v= 365= k^s^i=mlpqdo^ar^qb=p`elli= The Rapid Integration and Test Environment : A Process for Achieving Software Test Acceptance Patrick V...was awarded the Bronze Star. Introduction The Rapid Integration and Test Environment (RITE) initiative, implemented by the Program Executive Office

  19. Southern Impact Testing Alliance (SITA)

    NASA Technical Reports Server (NTRS)

    Hubbs, Whitney; Roebuck, Brian; Zwiener, Mark; Wells, Brian

    2009-01-01

    Efforts to form this Alliance began in 2008 to showcase the impact testing capabilities within the southern United States. Impact testing customers can utilize SITA partner capabilities to provide supporting data during all program phases-materials/component/ flight hardware design, development, and qualification. This approach would allow programs to reduce risk by providing low cost testing during early development to flush out possible problems before moving on to larger scale1 higher cost testing. Various SITA partners would participate in impact testing depending on program phase-materials characterization, component/subsystem characterization, full-scale system testing for qualification. SITA partners would collaborate with the customer to develop an integrated test approach during early program phases. Modeling and analysis validation can start with small-scale testing to ensure a level of confidence for the next step large or full-scale conclusive test shots. Impact Testing Facility (ITF) was established and began its research in spacecraft debris shielding in the early 1960's and played a malor role in the International Space Station debris shield development. As a result of return to flight testing after the loss of STS-107 (Columbia) MSFC ITF realized the need to expand their capabilities beyond meteoroid and space debris impact testing. MSFC partnered with the Department of Defense and academic institutions as collaborative efforts to gain and share knowledge that would benefit the Space Agency as well as the DoD. MSFC ITF current capabilities include: Hypervelocity impact testing, ballistic impact testing, and environmental impact testing.

  20. Effects of a Computerized Program on Use of the Test-Taking Strategy by Secondary Students with Disabilities

    ERIC Educational Resources Information Center

    Lancaster, Paula E.; Schumaker, Jean B.; Lancaster, Sean J. C.; Deshler, Donald D.

    2009-01-01

    Students with disabilities must meet many testing demands, given the current emphasis on accountability and state competency testing. The purpose of this project was to develop and field test a computerized program to teach the Test-Taking Strategy (Hughes, Schumaker, Deshler, & Mercer, 1988) to secondary-level students with disabilities. The…

  1. 14 CFR 120.103 - General.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AND OPERATORS FOR COMPENSATION OR HIRE: CERTIFICATION AND OPERATIONS DRUG AND ALCOHOL TESTING PROGRAM Drug Testing Program Requirements § 120.103 General. (a) Purpose. The purpose of this subpart is to... ensure that drug testing programs conducted pursuant to 14 CFR parts 65, 91, 121, and 135 comply with the...

  2. 14 CFR 120.103 - General.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... AND OPERATORS FOR COMPENSATION OR HIRE: CERTIFICATION AND OPERATIONS DRUG AND ALCOHOL TESTING PROGRAM Drug Testing Program Requirements § 120.103 General. (a) Purpose. The purpose of this subpart is to... ensure that drug testing programs conducted pursuant to 14 CFR parts 65, 91, 121, and 135 comply with the...

  3. 14 CFR 120.103 - General.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... AND OPERATORS FOR COMPENSATION OR HIRE: CERTIFICATION AND OPERATIONS DRUG AND ALCOHOL TESTING PROGRAM Drug Testing Program Requirements § 120.103 General. (a) Purpose. The purpose of this subpart is to... ensure that drug testing programs conducted pursuant to 14 CFR parts 65, 91, 121, and 135 comply with the...

  4. 14 CFR 120.103 - General.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... AND OPERATORS FOR COMPENSATION OR HIRE: CERTIFICATION AND OPERATIONS DRUG AND ALCOHOL TESTING PROGRAM Drug Testing Program Requirements § 120.103 General. (a) Purpose. The purpose of this subpart is to... ensure that drug testing programs conducted pursuant to 14 CFR parts 65, 91, 121, and 135 comply with the...

  5. AVHRR/1-FM Advanced Very High Resolution Radiometer

    NASA Technical Reports Server (NTRS)

    1979-01-01

    The advanced very high resolution radiometer is discussed. The program covers design, construction, and test of a breadboard model, engineering model, protoflight model, mechanical/structural model, and a life test model. Special bench test and calibration equipment was developed for use on the program. The flight model program objectives were to fabricate, assemble and test four of the advanced very high resolution radiometers along with a bench cooler and collimator.

  6. High Power Magnetohydrodynamic System

    DTIC Science & Technology

    1978-07-01

    AFAPL/POD as the Program Manager. Dr. Daniel W. Swallom and Dr. Otto K. Sonju of Maxwell Laboratories, Inc. were responsible for the technical work. The...fabricated and tested. Figure 1 shows this hardware installed at the Santa Susana Field Laboratory (SSFL) for develop- ment testing. The cooled wall...development test program was conducted at Santa Susana Field Laboratory (SSFL) and a performance test program is to be conducted at AEDC. AEDC is to

  7. Reliability of programs specified with equational specifications

    NASA Astrophysics Data System (ADS)

    Nikolik, Borislav

    Ultrareliability is desirable (and sometimes a demand of regulatory authorities) for safety-critical applications, such as commercial flight-control programs, medical applications, nuclear reactor control programs, etc. A method is proposed, called the Term Redundancy Method (TRM), for obtaining ultrareliable programs through specification-based testing. Current specification-based testing schemes need a prohibitively large number of testcases for estimating ultrareliability. They assume availability of an accurate program-usage distribution prior to testing, and they assume the availability of a test oracle. It is shown how to obtain ultrareliable programs (probability of failure near zero) with a practical number of testcases, without accurate usage distribution, and without a test oracle. TRM applies to the class of decision Abstract Data Type (ADT) programs specified with unconditional equational specifications. TRM is restricted to programs that do not exceed certain efficiency constraints in generating testcases. The effectiveness of TRM in failure detection and recovery is demonstrated on formulas from the aircraft collision avoidance system TCAS.

  8. Employee Drug Testing. Information on Private Sector Programs. Report to the Honorable Charles Schumer, House of Representatives.

    ERIC Educational Resources Information Center

    General Accounting Office, Washington, DC. General Government Div.

    At the request of Congress, the General Accounting Office studied drug testing in the private sector to determine its extent, which testing methods are most often used, who receives drug testing and why, the reasons for having a drug testing program, and what happens to those persons who test positive. Data were obtained from 10 surveys to which a…

  9. Rubidium frequency standard test program for NAVSTAR GPS

    NASA Technical Reports Server (NTRS)

    Koide, F.; Dederich, D. J.

    1978-01-01

    Test data of the RFS Program in the Production phase and computer automation are presented, as an essential element in the evaluation of the RFS performance in a simulated spacecraft environment. Typical production test data will be discussed for stabilities from 1 to 100,000 seconds averaging time and simulated time error accumulation test. Also, design considerations in developing the RFS test systems for the acceptance test in production are discussed.

  10. 42 CFR 493.959 - Immunohematology.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... challenges per testing event a program must provide for each analyte or test procedure is five. Analyte or... Compatibility testing Antibody identification (d) Evaluation of a laboratory's analyte or test performance. HHS... program must compare the laboratory's response for each analyte with the response that reflects agreement...

  11. 42 CFR 493.959 - Immunohematology.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... challenges per testing event a program must provide for each analyte or test procedure is five. Analyte or... Compatibility testing Antibody identification (d) Evaluation of a laboratory's analyte or test performance. HHS... program must compare the laboratory's response for each analyte with the response that reflects agreement...

  12. 42 CFR 493.959 - Immunohematology.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... challenges per testing event a program must provide for each analyte or test procedure is five. Analyte or... Compatibility testing Antibody identification (d) Evaluation of a laboratory's analyte or test performance. HHS... program must compare the laboratory's response for each analyte with the response that reflects agreement...

  13. 42 CFR 493.959 - Immunohematology.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... challenges per testing event a program must provide for each analyte or test procedure is five. Analyte or... Compatibility testing Antibody identification (d) Evaluation of a laboratory's analyte or test performance. HHS... program must compare the laboratory's response for each analyte with the response that reflects agreement...

  14. The multispectral instrument of the Sentinel2 EM program results

    NASA Astrophysics Data System (ADS)

    Chorvalli, Vincent; Espuche, Stéphane; Delbru, Francis; Martimort, Philippe; Fernandez, Valerie; Kirchner, Volker

    2017-11-01

    The MSI EM campaign has been conducted before releasing the flight model integration and test. This paper presents the MSI EM configuration and the various tests results. Experience gained through this extensive test program allowed securing the MSI PFM integration and test activities.

  15. 14 CFR 120.111 - Administrative and other matters.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... ALCOHOL TESTING PROGRAM Drug Testing Program Requirements § 120.111 Administrative and other matters. (a... for the employer must be produced at the employer's place of business. (c) Release of drug testing information. An employer shall release information regarding an employee's drug testing results, evaluation...

  16. 76 FR 74063 - Mandatory Guidelines for Federal Workplace Drug Testing Programs

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-30

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Mandatory Guidelines for Federal Workplace Drug Testing... Federal Workplace Drug Testing Programs (Mandatory Guidelines), effective on October 1, 2010, addresses... for physicians performing a review of Federal employee drug testing results that seek approval by the...

  17. 14 CFR 120.111 - Administrative and other matters.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... ALCOHOL TESTING PROGRAM Drug Testing Program Requirements § 120.111 Administrative and other matters. (a... for the employer must be produced at the employer's place of business. (c) Release of drug testing information. An employer shall release information regarding an employee's drug testing results, evaluation...

  18. 14 CFR 120.111 - Administrative and other matters.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... ALCOHOL TESTING PROGRAM Drug Testing Program Requirements § 120.111 Administrative and other matters. (a... for the employer must be produced at the employer's place of business. (c) Release of drug testing information. An employer shall release information regarding an employee's drug testing results, evaluation...

  19. 14 CFR 120.111 - Administrative and other matters.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... ALCOHOL TESTING PROGRAM Drug Testing Program Requirements § 120.111 Administrative and other matters. (a... for the employer must be produced at the employer's place of business. (c) Release of drug testing information. An employer shall release information regarding an employee's drug testing results, evaluation...

  20. 14 CFR 120.111 - Administrative and other matters.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... ALCOHOL TESTING PROGRAM Drug Testing Program Requirements § 120.111 Administrative and other matters. (a... for the employer must be produced at the employer's place of business. (c) Release of drug testing information. An employer shall release information regarding an employee's drug testing results, evaluation...

  1. 40 CFR 172.4 - Applications.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... program will be destroyed or fed only to experimental animals for testing purposes, or otherwise disposed... product, if registered; (iii) The purpose or objectives of the proposed testing; a description in detail of the proposed testing program including test parameters; a designation of the pest organism(s...

  2. 40 CFR 172.4 - Applications.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... program will be destroyed or fed only to experimental animals for testing purposes, or otherwise disposed... product, if registered; (iii) The purpose or objectives of the proposed testing; a description in detail of the proposed testing program including test parameters; a designation of the pest organism(s...

  3. 40 CFR 172.4 - Applications.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... program will be destroyed or fed only to experimental animals for testing purposes, or otherwise disposed... product, if registered; (iii) The purpose or objectives of the proposed testing; a description in detail of the proposed testing program including test parameters; a designation of the pest organism(s...

  4. 40 CFR 172.4 - Applications.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... program will be destroyed or fed only to experimental animals for testing purposes, or otherwise disposed... product, if registered; (iii) The purpose or objectives of the proposed testing; a description in detail of the proposed testing program including test parameters; a designation of the pest organism(s...

  5. 40 CFR 172.4 - Applications.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... program will be destroyed or fed only to experimental animals for testing purposes, or otherwise disposed... product, if registered; (iii) The purpose or objectives of the proposed testing; a description in detail of the proposed testing program including test parameters; a designation of the pest organism(s...

  6. Means-Tested Public Assistance Programs and Adolescent Political Socialization.

    PubMed

    Barnes, Carolyn Y; Hope, Elan C

    2017-07-01

    In recent years, scholars have pointed to the politically demobilizing effects of means-tested assistance programs on recipients. In this study, we bridge the insights from policy feedback literature and adolescent political socialization research to examine how receiving means-tested programs shapes parent influence on adolescent political participation. We argue that there are differences in pathways to political participation through parent political socialization and youth internal efficacy beliefs for adolescents from households that do or do not receive means-tested assistance. Using data from a nationally representative sample of 536 Black, Latino, and White adolescents (50.8% female), we find that adolescents from means-tested assistance households report less parent political socialization and political participation. For all youth, parent political socialization predicts adolescent political participation. Internal political efficacy is a stronger predictor of political participation for youth from a non-means-tested assistance household than it is for youth from a household receiving means-tested assistance. These findings provide some evidence of differential paths to youth political participation via exposure to means-tested programs.

  7. Methodologies for Combined Loads Tests Using a Multi-Actuator Test Machine

    NASA Technical Reports Server (NTRS)

    Rouse, Marshall

    2013-01-01

    The NASA Langley COmbined Loads Test System (COLTS) Facility was designed to accommodate a range of fuselage structures and wing sections and subject them to both quasistatic and cyclic loading conditions. Structural tests have been conducted in COLTS that address structural integrity issues of metallic and fiber reinforced composite aerospace structures in support of NASA Programs (i.e. the Aircraft Structural Integrity (ASIP) Program, High-Speed-Research program and the Supersonic Project, NASA Engineering and Safety Center (NESC) Composite Crew Module Project, and the Environmentally Responsible Aviation Program),. This paper presents experimental results for curved panels subjected to mechanical and internal pressure loads using a D-box test fixture. Also, results are presented that describe use of a checkout beam for development of testing procedures for a combined mechanical and pressure loading test of a Multi-bay box. The Multi-bay box test will be used to experimentally verify the structural performance of the Multi-bay box in support of the Environmentally Responsible Aviation Project at NASA Langley.

  8. RS-88 Pad Abort Demonstrator Thrust Chamber Assembly Testing at NASA Marshall Space Flight Center

    NASA Technical Reports Server (NTRS)

    Farr, Rebecca A.; Sanders, Timothy M.

    1990-01-01

    This paper documents the effort conducted to collect hot-tire dynamic and acoustics environments data during 50,000-lb thrust lox-ethanol hot-fire rocket testing at NASA Marshall Space Flight Center (MSFC) in November-December 2003. This test program was conducted during development testing of the Boeing Rocketdyne RS-88 development engine thrust chamber assembly (TCA) in support of the Orbital Space Plane (OSP) Crew Escape System Propulsion (CESP) Program Pad Abort Demonstrator (PAD). In addition to numerous internal TCA and nozzle measurements, induced acoustics environments data were also collected. Provided here is an overview of test parameters, a discussion of the measurements, test facility systems and test operations, and a quality assessment of the data collected during this test program.

  9. Solar thermal upper stage technology demonstrator liquid hydrogen storage and feed system test program

    NASA Astrophysics Data System (ADS)

    Cady, E. C.

    1997-01-01

    The Solar Thermal Upper Stage Technology Demonstrator (STUSTD) Liquid Hydrogen Storage and Feed System (LHSFS) Test Program is described. The test program consists of two principal phases. First, an engineering characterization phase includes tests performed to demonstrate and understand the expected tank performance. This includes fill and drain; baseline heat leak; active Thermodynamic Vent System (TVS); and flow tests. After the LHSFS performance is understood and performance characteristics are determined, a 30 day mission simulation test will be conducted. This test will simulate a 30 day transfer mission from low earth orbit (LEO) to geosynchronous equatorial orbit (GEO). Mission performance predictions, based on the results of the engineering characterization tests, will be used to correlate the results of the 30 day mission simulation.

  10. MIUS integration and subsystems test program

    NASA Technical Reports Server (NTRS)

    Beckham, W. S., Jr.; Shows, G. C.; Redding, T. E.; Wadle, R. C.; Keough, M. B.; Poradek, J. C.

    1976-01-01

    The MIUS Integration and Subsystems Test (MIST) facility at the Lyndon B. Johnson Space Center was completed and ready in May 1974 for conducting specific tests in direct support of the Modular Integrated Utility System (MIUS). A series of subsystems and integrated tests was conducted since that time, culminating in a series of 24-hour dynamic tests to further demonstrate the capabilities of the MIUS Program concepts to meet typical utility load profiles for a residential area. Results of the MIST Program are presented which achieved demonstrated plant thermal efficiencies ranging from 57 to 65 percent.

  11. How Miniature/Microminiature (2M) Repair Capabilities Can Reduce the Impact of No Evidence of Failure (NEOF) Among Repairables on the Navy’s Operations and Maintenance Account

    DTIC Science & Technology

    1988-06-01

    and PCBs. The pilot program involved screening, testing , and repairing of EMs/PCBs for both COMNAVSEASYSCOM and Commander, Naval Electronic Systems...were chosen from the Support and Test Equipment Engineering Program (STEEP) tests rformed by"IMA San Diego duringl987. A statistical analysis and a Level...were chosen from the Support and Test Equipment Engineering Program (STEEP) tests performed by SIMA San Diego during 1987. A statistical analysis and a

  12. Electrical Arc Ignition Testing for Constellation Program

    NASA Technical Reports Server (NTRS)

    Sparks, Kyle; Gallus, Timothy; Smith, Sarah

    2009-01-01

    NASA Johnson Space Center (JSC) Materials and Processes Branch requested that NASA JSC White Sands Test Facility (WSTF) perform testing for the Constellation Program to evaluate the hazard of electrical arc ignition of materials that could be in close proximity to batteries. Specifically, WSTF was requested to perform wire-break electrical arc tests to determine the current threshold for ignition of generic cotton woven fabric samples with a fixed voltage of 3.7 V, a common voltage for hand-held electrical devices. The wire-break test was developed during a previous test program to evaluate the hazard of electrical arc ignition inside the Extravehicular Mobility Unit [1].

  13. Effectiveness of gratitude disposition promotion program on depression and quality of life of chronic schizophrenic patients

    PubMed Central

    Jung, Miran; Han, Kuemsun

    2017-01-01

    Context: Gratitude intervention is expectedly an effective intervention to reduce depression and improve the quality of life in schizophrenic patients, but there is a lack of literature on it. Aims: We attempted to develop and test the effectiveness of the gratitude disposition promotion program for chronic schizophrenic patients in Korea. Settings and Design: Nonequivalent control group pre- and post-test design was used in two mental health centers located at Gyeonggi-do in South Korea. Materials and Methods: This paper was a quasi-experimental study and the participants who took part in the gratitude disposition promotion program were 17 of experimental group and 15 of control group. Gratitude disposition (the short gratitude, resentment, and appreciation test), depression (Beck Depression Inventory), and quality of life (developed by Kook) of chronic schizophrenic patients were measured before and after an intervention, as compared to the control. Statistical Analysis: Chi-square test, Fisher's exact test, and t-test were performed for prehomogeneity testing for variables related to the general characteristics. Testing for the effectiveness of gratitude disposition promotion program and hypothesis testing for its effect on depression and quality of life were by ANCOVA and t-test, as verified to significance level of P < 0.05. Results: The participants who received the gratitude disposition promotion program showed significant improvements in gratitude disposition (F = 18.740, P < 0.0001) and in quality of life (F = 9.800, P = 0.004), but no significant difference in depression (F = 3.870, P = 0.059). Conclusions: The gratitude disposition promotion program was an effective clinical intervention program for enhancing gratitude disposition and quality of life of chronic schizophrenic patients in community. PMID:28827866

  14. Testing Programs in Schools: What's New? A Special Issue.

    ERIC Educational Resources Information Center

    Walter, L. James; And Others

    1981-01-01

    This special issue of "Catalyst", entitled Testing Programs in Schools: What's New?, was published jointly by the Nebraska Council of School Administrators and the Nebraska Association for Supervision and Curriculum. The articles emphasize desirability of designing testing programs to meet the information needs of educators and the…

  15. Test program for 4-K memory card, JOLT microprocessor

    NASA Technical Reports Server (NTRS)

    Lilley, R. W.

    1976-01-01

    A memory test program is described for use with the JOLT microcomputer 4,096-word memory board used in development of an Omega navigation receiver. The program allows a quick test of the memory board by cycling the memory through all possible bit combinations in all words.

  16. 2009 GED Testing Program Statistical Report

    ERIC Educational Resources Information Center

    GED Testing Service, 2010

    2010-01-01

    The "2009 GED[R] Testing Program Statistical Report" is the 52nd annual report in the program's 68-year history of providing a second opportunity for adults without a high school credential to earn their jurisdiction's GED credential. The report provides candidate demographic and GED Test performance statistics as well as historical…

  17. Onsite 40-kilowatt fuel cell power plant manufacturing and field test program

    NASA Technical Reports Server (NTRS)

    1985-01-01

    A joint Gas Research Institute and U.S. Department of Energy Program was initiated in 1982 to evaluate the use of fuel cell power systems for on-site energy service. Forty-six 40 kW fuel cell power plants were manufactured at the United Technologies Corporation facility in South Windsor, Connecticut, and are being delivered to host utilities and other program participants in the United States and Japan for field testing. The construction of the 46 fully-integrated power plants was completed in January 1985 within the constraints of the contract plan. The program has provided significant experience in the manufacture, acceptance testing, deployment, and support of on-site fuel cell systems. Initial field test results also show that these experimental power plants meet the performance and environmental requirements of a commercial specification. This Interim Report encompasses the design and manufacturing phases of the 40 kW Power Plant Manufacturing and Field Test program. The contract between UTC and NASA also provides UTC field engineering support to the host utilities, training programs and associated manuals for utility operating and maintenance personnel, spare parts support for a defined test period, and testing at UTC of a power plant made available from a preceding program phase. These activities are ongoing and will be reported subsequently.

  18. SPSS and SAS programming for the testing of mediation models.

    PubMed

    Dudley, William N; Benuzillo, Jose G; Carrico, Mineh S

    2004-01-01

    Mediation modeling can explain the nature of the relation among three or more variables. In addition, it can be used to show how a variable mediates the relation between levels of intervention and outcome. The Sobel test, developed in 1990, provides a statistical method for determining the influence of a mediator on an intervention or outcome. Although interactive Web-based and stand-alone methods exist for computing the Sobel test, SPSS and SAS programs that automatically run the required regression analyses and computations increase the accessibility of mediation modeling to nursing researchers. To illustrate the utility of the Sobel test and to make this programming available to the Nursing Research audience in both SAS and SPSS. The history, logic, and technical aspects of mediation testing are introduced. The syntax files sobel.sps and sobel.sas, created to automate the computation of the regression analysis and test statistic, are available from the corresponding author. The reported programming allows the user to complete mediation testing with the user's own data in a single-step fashion. A technical manual included with the programming provides instruction on program use and interpretation of the output. Mediation modeling is a useful tool for describing the relation between three or more variables. Programming and manuals for using this model are made available.

  19. OPTIMIZATION OF MUD HAMMER DRILLING PERFORMANCE - A PROGRAM TO BENCHMARK THE VIABILITY OF ADVANCED MUD HAMMER DRILLING

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gordon Tibbitts; Arnis Judzis

    2001-04-01

    This document details the progress to date on the OPTIMIZATION OF MUD HAMMER DRILLING PERFORMANCE -- A PROGRAM TO BENCHMARK THE VIABILITY OF ADVANCED MUD HAMMER DRILLING contract for the quarter starting January 2001 through March 2001. Accomplishments to date include the following: (1) On January 9th of 2001, details of the Mud Hammer Drilling Performance Testing Project were presented at a ''kick-off'' meeting held in Morgantown. (2) A preliminary test program was formulated and prepared for presentation at a meeting of the advisory board in Houston on the 8th of February. (3) The meeting was held with the advisorymore » board reviewing the test program in detail. (4) Consensus was achieved and the approved test program was initiated after thorough discussion. (5) This new program outlined the details of the drilling tests as well as scheduling the test program for the weeks of 14th and 21st of May 2001. (6) All the tasks were initiated for a completion to coincide with the test schedule. (7) By the end of March the hardware had been designed and the majority was either being fabricated or completed. (8) The rock was received and cored into cylinders.« less

  20. 77 FR 20291 - Energy Conservation Program: Test Procedures for Residential Clothes Washers; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-04

    ... Conservation Program: Test Procedures for Residential Clothes Washers; Correction AGENCY: Office of Energy.... Department of Energy (DOE) is correcting a final rule establishing revised test procedures for residential... factor calculation section of the currently applicable test procedure. DATES: Effective: April 6, 2012...

  1. 78 FR 2675 - Mandatory Guidelines for Federal Workplace Drug Testing Programs

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-14

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Mandatory Guidelines for Federal Workplace Drug Testing... Federal Workplace Drug Testing Programs (Mandatory Guidelines), effective on October 1, 2010, addresses... performing a review of Federal employee drug testing results that seek approval by the Secretary must submit...

  2. 75 FR 76478 - Mandatory Guidelines for Federal Workplace Drug Testing Programs

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-08

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Mandatory Guidelines for Federal Workplace Drug Testing... Drug Testing Programs (Mandatory Guidelines) which took effect on October 1, 2010 address the role and... Federal employee drug testing results that seek approval by the Secretary must submit their qualifications...

  3. 10 CFR 430.25 - Laboratory Accreditation Program.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Procedures § 430.25 Laboratory Accreditation Program. The testing for general service fluorescent lamps... Appendix R to this subpart. The testing for medium base compact fluorescent lamps shall be performed in accordance with Appendix W of this subpart. This testing shall be conducted by test laboratories accredited...

  4. 10 CFR 430.25 - Laboratory Accreditation Program.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Procedures § 430.25 Laboratory Accreditation Program. The testing for general service fluorescent lamps... Appendix R to this subpart. The testing for medium base compact fluorescent lamps shall be performed in accordance with Appendix W of this subpart. This testing shall be conducted by test laboratories accredited...

  5. The use of one- versus two-tailed tests to evaluate prevention programs.

    PubMed

    Ringwalt, Chris; Paschall, M J; Gorman, Dennis; Derzon, James; Kinlaw, Alan

    2011-06-01

    Investigators have used both one- and two-tailed tests to determine the significance of findings yielded by program evaluations. While the literature that addresses the appropriate use of each type of significance test should be used is historically inconsistent, almost all authorities now agree that one-tailed tests are rarely (if ever) appropriate. A review of 85 published evaluations of school-based drug prevention curricula specified on the National Registry of Effective Programs and Practices revealed that 20% employed one-tailed tests and, within this subgroup, an additional 4% also employed two-tailed tests. The majority of publications either did not specify the type of statistical test employed or used some other criterion such as effect sizes or confidence intervals. Evaluators reported that they used one-tailed tests either because they stipulated the direction of expected findings in advance, or because prior evaluations of similar programs had yielded no negative results. The authors conclude that one-tailed tests should never be used because they introduce greater potential for Type I errors and create an uneven playing field when outcomes are compared across programs. The authors also conclude that the traditional threshold of significance that places α at .05 is arbitrary and obsolete, and that evaluators should consistently report the exact p values they find.

  6. The calibration and flight test performance of the space shuttle orbiter air data system

    NASA Technical Reports Server (NTRS)

    Dean, A. S.; Mena, A. L.

    1983-01-01

    The Space Shuttle air data system (ADS) is used by the guidance, navigation and control system (GN&C) to guide the vehicle to a safe landing. In addition, postflight aerodynamic analysis requires a precise knowledge of flight conditions. Since the orbiter is essentially an unpowered vehicle, the conventional methods of obtaining the ADS calibration were not available; therefore, the calibration was derived using a unique and extensive wind tunnel test program. This test program included subsonic tests with a 0.36-scale orbiter model, transonic and supersonic tests with a smaller 0.2-scale model, and numerous ADS probe-alone tests. The wind tunnel calibration was further refined with subsonic results from the approach and landing test (ALT) program, thus producing the ADS calibration for the orbital flight test (OFT) program. The calibration of the Space Shuttle ADS and its performance during flight are discussed in this paper. A brief description of the system is followed by a discussion of the calibration methodology, and then by a review of the wind tunnel and flight test programs. Finally, the flight results are presented, including an evaluation of the system performance for on-board systems use and a description of the calibration refinements developed to provide the best possible air data for postflight analysis work.

  7. Testing Conducted for Lithium-Ion Cell and Battery Verification

    NASA Technical Reports Server (NTRS)

    Reid, Concha M.; Miller, Thomas B.; Manzo, Michelle A.

    2004-01-01

    The NASA Glenn Research Center has been conducting in-house testing in support of NASA's Lithium-Ion Cell Verification Test Program, which is evaluating the performance of lithium-ion cells and batteries for NASA mission operations. The test program is supported by NASA's Office of Aerospace Technology under the NASA Aerospace Flight Battery Systems Program, which serves to bridge the gap between the development of technology advances and the realization of these advances into mission applications. During fiscal year 2003, much of the in-house testing effort focused on the evaluation of a flight battery originally intended for use on the Mars Surveyor Program 2001 Lander. Results of this testing will be compared with the results for similar batteries being tested at the Jet Propulsion Laboratory, the Air Force Research Laboratory, and the Naval Research Laboratory. Ultimately, this work will be used to validate lithium-ion battery technology for future space missions. The Mars Surveyor Program 2001 Lander battery was characterized at several different voltages and temperatures before life-cycle testing was begun. During characterization, the battery displayed excellent capacity and efficiency characteristics across a range of temperatures and charge/discharge conditions. Currently, the battery is undergoing lifecycle testing at 0 C and 40-percent depth of discharge under low-Earth-orbit (LEO) conditions.

  8. HIV/AIDS Services in Private Substance Abuse Treatment Programs

    PubMed Central

    Abraham, Amanda J.; O’Brien, Lauren A.; Bride, Brian E.; Roman, Paul M.

    2010-01-01

    Background HIV infection among substance abusers is a growing concern in the United States. Little research, however, has examined the provision of HIV/AIDS services in substance abuse treatment programs. Methods This study examines the provision of onsite HIV/AIDS services in a nationally representative sample of 345 privately funded substance abuse treatment programs. Data were collected via face-to-face interviews with administrators and clinical directors of treatment programs in 2007–2008. Results Results show that larger programs and programs with a higher percentage of both African American and injection drug using (IDU) patients were more likely to offer onsite HIV/AIDS support groups and a dedicated HIV/AIDS treatment track. Multinomial logistic regression reveals that the odds of offering onsite HIV testing services were higher for hospital based programs, programs providing medical services onsite, and programs with higher percentages of African American patients, relative to the odds of offering no HIV testing or referring patients to an external provider for HIV testing services. The odds of providing onsite testing were lower for outpatient-only treatment programs, relative to the odds of offering no HIV testing or referring patients to an external provider for HIV testing services. Conclusions Our findings highlight critical barriers to the adoption of onsite HIV/AIDS services and suggest treatment programs are missing the opportunity to significantly impact HIV-related health outcomes. PMID:21145179

  9. TDRSS system configuration study for space shuttle program

    NASA Technical Reports Server (NTRS)

    1978-01-01

    This study was set up to assure that operation of the shuttle orbiter communications systems met the program requirements when subjected to electrical conditions similar to those which will be encountered during the operational mission. The test program intended to implement an integrated test bed, consisting of applicable orbiter, EVA, payload simulator, STDN, and AF/SCF, as well as the TDRSS equipment. The stated intention of Task 501 Program was to configure the test bed with prototype hardware for a system development test and production hardware for a system verification test. In case of TDRSS when the hardware was not available, simulators whose functional performance was certified to meet appropriate end item specification were used.

  10. JWST Telescope Integration and Test Progress

    NASA Technical Reports Server (NTRS)

    Matthews, Gary W.; Whitman, Tony L.; Feinberg, Lee D.; Voyton, Mark F.; Lander, Juli A.; Keski-Kuha, Ritva

    2016-01-01

    The James Webb Space Telescope (JWST) is a 6.5m, segmented, IR telescope that will explore the first light of the universe after the big bang. The JWST Optical Telescope Element (Telescope) integration and test program is well underway. The telescope was completed in the spring of 2016 and the cryogenic test equipment has been through two optical test programs leading up to the final flight verification program. The details of the telescope mirror integration will be provided along with the current status of the flight observatory. In addition, the results of the two optical ground support equipment cryo tests will be shown and how these plans fold into the flight verification program.

  11. Automotive Stirling engine development program

    NASA Technical Reports Server (NTRS)

    Ernst, W.; Richey, A.; Farrell, R.; Riecke, G.; Smith, G.; Howarth, R.; Cronin, M.; Simetkosky, M.; Meacher, J.

    1986-01-01

    This is the ninth Semiannual Technical Progress Report prepared under the Automotive Stirling Engine Development Program. It covers the twenty-eighth and twenty-ninth quarters of activity after award of the contract. Quarterly Technical Progress Reports related program activities from the first through the thirteenth quarters; thereafter, reporting was changed to a Semiannual format. This report summarizes the study of higher-power kinematic Stirling engines for transportation use, development testing of Mod I Stirling engines, and component development activities. Component development testing included successful conical fuel nozzle testing and functional checkout of Mod II controls and auxiliaries on Mod I engine test beds. Overall program philosophy is outlined and data and test results are presented.

  12. Self-Reported Drug and Alcohol Use and Attitudes toward Drug Testing in High Schools with Random Student Drug Testing

    ERIC Educational Resources Information Center

    DuPont, Robert L.; Campbell, Michael D.; Campbell, Teresa G.; Shea, Corinne L.; DuPont, Helen S.

    2013-01-01

    Many schools implement random student drug testing (RSDT) programs as a drug prevention strategy. This study analyzes self-report surveys of students in eight secondary schools with well-established RSDT programs, comparing students who understood they were subject to testing and students who understood they were not subject to testing. Students…

  13. Machine on Trial

    DTIC Science & Technology

    2012-06-01

    executed a concerted effort to employ reliability standards and testing from the design phase through fielding. Reliability programs remain standard...performed flight test engineer duties on several developmental flight test programs and served as Chief Engineer for a flight test squadron. Major...Quant is an acquisition professional with over 250 flight test hours in various aircraft, including the F-16, Airborne Laser, and HH-60. She holds a

  14. Principles and Practices of Test Score Equating. Research Report. ETS RR-10-29

    ERIC Educational Resources Information Center

    Dorans, Neil J.; Moses, Tim P.; Eignor, Daniel R.

    2010-01-01

    Score equating is essential for any testing program that continually produces new editions of a test and for which the expectation is that scores from these editions have the same meaning over time. Particularly in testing programs that help make high-stakes decisions, it is extremely important that test equating be done carefully and accurately.…

  15. Multidimensional Computerized Adaptive Scholastic Aptitude Test Program Used for Grade 9 Students under Different Reviewing Test Conditions

    ERIC Educational Resources Information Center

    Khunkrai, Naruemon; Sawangboon, Tatsirin; Ketchatturat, Jatuphum

    2015-01-01

    The aim of this research is to study the accurate prediction of comparing test information and evaluation result by multidimensional computerized adaptive scholastic aptitude test program used for grade 9 students under different reviewing test conditions. Grade 9 students of the Secondary Educational Service Area Office in the North-east of…

  16. Advanced composite elevator for Boeing 727 aircraft

    NASA Technical Reports Server (NTRS)

    1979-01-01

    Detail design activities are reported for a program to develop an advanced composites elevator for the Boeing 727 commercial transport. Design activities include discussion of the full scale ground test and flight test activities, the ancillary test programs, sustaining efforts, weight status, and the production status. Prior to flight testing of the advanced composites elevator, ground, flight flutter, and stability and control test plans were reviewed and approved by the FAA. Both the ground test and the flight test were conducted according to the approved plan, and were witnessed by the FAA. Three and one half shipsets have now been fabricated without any significant difficulty being encountered. Two elevator system shipsets were weighed, and results validated the 26% predicted weight reduction. The program is on schedule.

  17. The inclusion of 'then-test' questions in post-test questionnaires alters post-test responses: a randomized study of bias in health program evaluation.

    PubMed

    Nolte, Sandra; Elsworth, Gerald R; Sinclair, Andrew J; Osborne, Richard H

    2012-04-01

    Program evaluations are frequently based on 'then-test' data, i.e., pre-test collected in retrospect. While the application of the then-test has practical advantages, little is known about the validity of then-test data. Because of the collection of then-test in close proximity to post-test questions, this study was aimed at exploring whether the presence of then-test questions in post-test questionnaires influenced subjects' responses to post-test. To test the influence of then-test questions, we designed a randomized three-group study in the context of chronic disease self-management programs. Interventions had comparable goals and philosophies, and all 949 study participants filled out identical Health Education Impact Questionnaires (heiQ) at pre-test. At post-test, participants were then randomized to one of the following three groups: Group A responded to post-test questions only (n = 331); Group B filled out transition questions in addition to post-test (n = 304); and Group C filled out then-test questions in addition to post-test (n = 314). Significant post-test differences were found in six of eight heiQ scales, with respondents who filled out then-test questions reporting significantly higher post-test scores than respondents of the other groups. This study provides evidence that the inclusion of then-test questions alters post-test responses, suggesting that change scores based on then-test data be interpreted with care.

  18. 23. "A CAPTIVE ATLAS MISSILE EXPLODED DURING THE TEST ON ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    23. "A CAPTIVE ATLAS MISSILE EXPLODED DURING THE TEST ON TEST STAND 1-A, 27 MARCH 1959, PUTTING THAT TEST STAND OUT-OF-COMMISSION. STAND WAS NOT REPAIRED FOR THE ATLAS PROGRAM BUT TRANSFERRED TO ROCKETDYNE AND MODIFIED FOR THE F-l ENGINE PROGRAM." - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Test Stand 1-A, Test Area 1-120, north end of Jupiter Boulevard, Boron, Kern County, CA

  19. Automotive Stirling engine development program

    NASA Technical Reports Server (NTRS)

    Nightingale, N.; Ernst, W.; Richey, A.; Simetkosky, M.; Smith, G.; Rohdenburg, C.; Vatsky, A.; Antonelli, M. (Editor)

    1983-01-01

    Activities performed on Mod I engine testing and test results, testing of the Mod I engine in the United States, Mod I engine characterization and analyses, Mod I Transient Test Bed fuel economy, upgraded Mod I performance and testing, Stirling engine reference engine manufacturing and reduced size studied, components and subsystems, and the study and test of low cost casting alloys are summarized. The overall program philosophy is outlined, and data and results are presented.

  20. Microcomputer Network for Computerized Adaptive Testing (CAT): Program Listing. Supplement.

    DTIC Science & Technology

    1984-03-01

    UMICROCOMPUTER NETWORK FOR COMPUTERIZED ADAPTIVE TESTING ( CAT ): PROGRAM LISTING in APPROVED FOR PUBLIC RELEASE;IDISTRIBUTION UNLIMITEDPs DTIC ’ Akf 3 0 1-d84...NETWORK FOR COMPUTERIZED ADAPTIVE TESTING ( CAT ).- PROGRAM LISTING , ,j Baldwin Quan Thomas A. Park Gary Sandahl John H. Wolfe Reviewed by James R. McBride A...Center San Diego, California 92152 V.% :-, CONTENTrS Page CATPROJECT.TEXT CAT system driver textfile I 1 ADMINDIR- Subdirectory - Test administration

  1. Fall-to-Fall Testing versus Spring-to-Spring Testing: What Is the Impact on a Local Community's Chapter 1 Evaluation?

    ERIC Educational Resources Information Center

    Bushner, Diane E.

    The impact of a decision by a local program under Chapter 1, the federally funded program of financial assistance to special educational needs of children, to test students fall-to-fall or spring-to-spring was studied. Students enrolled in a Chapter 1 reading program in 1988-89 were tested on a fall-to-spring basis, a spring-to-spring basis, and a…

  2. Manned Systems Utilization Analysis. Study 2.1: Space Servicing Pilot Program Study. [for automated payloads

    NASA Technical Reports Server (NTRS)

    Wolfe, R. R.

    1975-01-01

    Space servicing automated payloads was studied for potential cost benefits for future payload operations. Background information is provided on space servicing in general, and on a pilot flight test program in particular. An fight test is recommended to demonstrate space servicing. An overall program plan is provided which builds upon the pilot program through an interim servicing capability. A multipayload servicing concept for the time when the full capability tug becomes operational is presented. The space test program is specifically designed to provide low-cost booster vehicles and a flight test platform for several experiments on a single flight.

  3. Assessment of analytical and experimental techniques utilized in conducting plume technology tests 575 and 593. [exhaust flow simulation (wind tunnel tests) of scale model Space Shuttle Orbiter

    NASA Technical Reports Server (NTRS)

    Baker, L. R.; Sulyma, P. R.; Tevepaugh, J. A.; Penny, M. M.

    1976-01-01

    Since exhaust plumes affect vehicle base environment (pressure and heat loads) and the orbiter vehicle aerodynamic control surface effectiveness, an intensive program involving detailed analytical and experimental investigations of the exhaust plume/vehicle interaction was undertaken as a pertinent part of the overall space shuttle development program. The program, called the Plume Technology program, has as its objective the determination of the criteria for simulating rocket engine (in particular, space shuttle propulsion system) plume-induced aerodynamic effects in a wind tunnel environment. The comprehensive experimental program was conducted using test facilities at NASA's Marshall Space Flight Center and Ames Research Center. A post-test examination of some of the experimental results obtained from NASA-MSFC's 14 x 14-inch trisonic wind tunnel is presented. A description is given of the test facility, simulant gas supply system, nozzle hardware, test procedure and test matrix. Analysis of exhaust plume flow fields and comparison of analytical and experimental exhaust plume data are presented.

  4. Integrated Vehicle Ground Vibration Testing of Manned Spacecraft: Historical Precedent

    NASA Technical Reports Server (NTRS)

    Lemke, Paul R.; Tuma, Margaret L.; Askins, Bruce R.

    2008-01-01

    For the first time in nearly 30 years, NASA is developing a new manned space flight launch system. The Ares I will carry crew and cargo to not only the International Space Station, but onward for the future exploration of the Moon and Mars. The Ares I control system and structural designs use complex computer models for their development. An Integrated Vehicle Ground Vibration Test (IVGVT) will validate the efficacy of these computer models. The IVGVT will reduce the technical risk of unexpected conditions that could place the vehicle or crew in jeopardy. The Ares Project Office's Flight and Integrated Test Office commissioned a study to determine how historical programs, such as Saturn and Space Shuttle, validated the structural dynamics of an integrated flight vehicle. The study methodology was to examine the historical record and seek out members of the engineering community who recall the development of historic manned launch vehicles. These records and interviews provided insight into the best practices and lessons learned from these historic development programs. The information that was gathered allowed the creation of timelines of the historic development programs. The timelines trace the programs from the development of test articles through test preparation, test operations, and test data reduction efforts. These timelines also demonstrate how the historical tests fit within their overall vehicle development programs. Finally, the study was able to quantify approximate staffing levels during historic development programs. Using this study, the Flight and Integrated Test Office was able to evaluate the Ares I Integrated Vehicle Ground Vibration Test schedule and workforce budgets in light of the historical precedents to determine if the test had schedule or cost risks associated with it.

  5. Test Report Emission Test Program EPA Information Collection Request for Delayed Coking Units 736 Coker Unit

    EPA Pesticide Factsheets

    ARI Environmental, Inc. (ARI) was retained by Houston Refining LP (HRO) to conduct an emission test program at their refinery located in Houston, Texas. The testing was conducted on on the 736 Delayed Coking Unit (DCU) in response to EPA's ICR.

  6. 40 CFR 51.365 - Data collection.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... test start time and the time final emission scores are determined; (6) Vehicle Identification Number... enforcement of an I/M program. The program shall gather test data on individual vehicles, as well as quality... equipment is required or those test procedures relying upon a vehicle's OBD system). (a) Test data. The goal...

  7. 40 CFR 51.365 - Data collection.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... test start time and the time final emission scores are determined; (6) Vehicle Identification Number... enforcement of an I/M program. The program shall gather test data on individual vehicles, as well as quality... equipment is required or those test procedures relying upon a vehicle's OBD system). (a) Test data. The goal...

  8. 75 FR 58329 - Federal Travel Regulation (FTR); Relocation Expenses Test Programs

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-24

    ...; Docket 2010-0016; Sequence 1] RIN 3090-ZA01 Federal Travel Regulation (FTR); Relocation Expenses Test... extended the authority for relocation expenses test programs for Federal employees, made by the passage of..., permits the Administrator of General Services to authorize Federal agencies to test new and innovative...

  9. 78 FR 4015 - Energy Conservation Program: Test Procedures for Microwave Ovens

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-18

    ... Conservation Program: Test Procedures for Microwave Ovens AGENCY: Office of Energy Efficiency and Renewable... Energy (DOE) issued a supplemental notice of proposed rulemaking (SNOPR) to amend the test procedures for microwave ovens. That SNOPR proposed amendments to the DOE test procedure to incorporate provisions from the...

  10. 75 FR 75666 - Advanced Placement (AP) Test Fee Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-06

    ... DEPARTMENT OF EDUCATION [CFDA No. 84.330B] Advanced Placement (AP) Test Fee Program AGENCY: Office... AP Test Fee fiscal year (FY) 2011 competition. SUMMARY: On September 1, 2010, we published in the Federal Register (75 FR 53681) a notice inviting applications for the AP Test Fee FY 2011 competition...

  11. Drug Testing in a University Athletic Program: Protocol and Implementation.

    ERIC Educational Resources Information Center

    Rovere, George D.; And Others

    1986-01-01

    An athletic drug education, counseling, and screening program at Wake Forest University is described. Decisions regarding which athletes to test, which drugs to test for and how to test for them, how to collect urine samples, and measures taken for a positive result are discussed. (MT)

  12. 9 CFR 55.24 - Herd status.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... available for testing (i.e., a trace animal from a known positive herd died and was not tested) or for other... with program requirements for animal identification, animal testing, and recordkeeping, the herd will... requirements of the CWD Herd Certification Program. The herd plan will require testing of all animals that die...

  13. 9 CFR 55.24 - Herd status.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... available for testing (i.e., a trace animal from a known positive herd died and was not tested) or for other... with program requirements for animal identification, animal testing, and recordkeeping, the herd will... requirements of the CWD Herd Certification Program. The herd plan will require testing of all animals that die...

  14. 9 CFR 55.24 - Herd status.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... available for testing (i.e., a trace animal from a known positive herd died and was not tested) or for other... with program requirements for animal identification, animal testing, and recordkeeping, the herd will... requirements of the CWD Herd Certification Program. The herd plan will require testing of all animals that die...

  15. 9 CFR 55.24 - Herd status.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... available for testing (i.e., a trace animal from a known positive herd died and was not tested) or for other... with program requirements for animal identification, animal testing, and recordkeeping, the herd will... requirements of the CWD Herd Certification Program. The herd plan will require testing of all animals that die...

  16. 9 CFR 55.24 - Herd status.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... available for testing (i.e., a trace animal from a known positive herd died and was not tested) or for other... with program requirements for animal identification, animal testing, and recordkeeping, the herd will... requirements of the CWD Herd Certification Program. The herd plan will require testing of all animals that die...

  17. 78 FR 59946 - Current List of Laboratories and Instrumented Initial Testing Facilities Which Meet Minimum...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-30

    ... Engage in Urine Drug Testing for Federal Agencies AGENCY: Substance Abuse and Mental Health Services... the standards of the Mandatory Guidelines for Federal Workplace Drug Testing Programs (Mandatory... 503 of Public Law 100-71. The ``Mandatory Guidelines for Federal Workplace Drug Testing Programs,'' as...

  18. 46 CFR 16.230 - Random testing requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... programs for the chemical testing for dangerous drugs on a random basis of crewmembers on inspected vessels... establish programs for the chemical testing for dangerous drugs on a random basis of crewmembers on... random drug testing shall be made by a scientifically valid method, such as a random number table or a...

  19. 76 FR 161 - Current List of Laboratories and Instrumented Initial Testing Facilities Which Meet Minimum...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-03

    ... Engage in Urine Drug Testing for Federal Agencies AGENCY: Substance Abuse and Mental Health Services... the standards of the Mandatory Guidelines for Federal Workplace Drug Testing Programs (Mandatory... ``Mandatory Guidelines for Federal Workplace Drug Testing Programs'', as amended in the revisions listed above...

  20. 77 FR 54597 - Current List of Laboratories and Instrumented Initial Testing Facilities Which Meet Minimum...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-05

    ... Engage in Urine Drug Testing for Federal Agencies AGENCY: Substance Abuse and Mental Health Services... the standards of the Mandatory Guidelines for Federal Workplace Drug Testing Programs (Mandatory... ``Mandatory Guidelines for Federal Workplace Drug Testing Programs'', as amended in the revisions listed above...

  1. 77 FR 26471 - Procedures for Transportation Workplace Drug and Alcohol Testing Programs: 6-acetylmorphine (6-AM...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-04

    ... 2105-AE14 Procedures for Transportation Workplace Drug and Alcohol Testing Programs: 6-acetylmorphine... Department is amending certain provisions of its drug testing procedures for 6-acetylmorphine (6-AM), a... (email). SUPPLEMENTARY INFORMATION: Background For its drug testing regulation, the Department of...

  2. 76 FR 24501 - Current List of Laboratories and Instrumented Initial Testing Facilities Which Meet Minimum...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-02

    ... Engage in Urine Drug Testing for Federal Agencies AGENCY: Substance Abuse and Mental Health Services... the standards of the Mandatory Guidelines for Federal Workplace Drug Testing Programs (Mandatory... 100-71. The ``Mandatory Guidelines for Federal Workplace Drug Testing Programs'', as amended in the...

  3. 46 CFR 16.230 - Random testing requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... programs for the chemical testing for dangerous drugs on a random basis of crewmembers on inspected vessels... establish programs for the chemical testing for dangerous drugs on a random basis of crewmembers on... random drug testing shall be made by a scientifically valid method, such as a random number table or a...

  4. 77 FR 20832 - Current List of Laboratories and Instrumented Initial Testing Facilities Which Meet Minimum...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-06

    ... Engage in Urine Drug Testing for Federal Agencies AGENCY: Substance Abuse and Mental Health Services... the standards of the Mandatory Guidelines for Federal Workplace Drug Testing Programs (Mandatory... ``Mandatory Guidelines for Federal Workplace Drug Testing Programs,'' as amended in the revisions listed above...

  5. 46 CFR 16.230 - Random testing requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... programs for the chemical testing for dangerous drugs on a random basis of crewmembers on inspected vessels... establish programs for the chemical testing for dangerous drugs on a random basis of crewmembers on... random drug testing shall be made by a scientifically valid method, such as a random number table or a...

  6. 77 FR 45645 - Current List of Laboratories and Instrumented Initial Testing Facilities Which Meet Minimum...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-01

    ... Engage in Urine Drug Testing for Federal Agencies AGENCY: Substance Abuse and Mental Health Services... the standards of the Mandatory Guidelines for Federal Workplace Drug Testing Programs (Mandatory... 100-71. The ``Mandatory Guidelines for Federal Workplace Drug Testing Programs,'' as amended in the...

  7. 76 FR 68201 - Current List of Laboratories and Instrumented Initial Testing Facilities Which Meet Minimum...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-03

    ... Engage in Urine Drug Testing for Federal Agencies AGENCY: Substance Abuse and Mental Health Services... the standards of the Mandatory Guidelines for Federal Workplace Drug Testing Programs (Mandatory... ``Mandatory Guidelines for Federal Workplace Drug Testing Programs'', as amended in the revisions listed above...

  8. 78 FR 72684 - Current List of Laboratories and Instrumented Initial Testing Facilities Which Meet Minimum...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-03

    ... Engage in Urine Drug Testing for Federal Agencies AGENCY: Substance Abuse and Mental Health Services... the standards of the Mandatory Guidelines for Federal Workplace Drug Testing Programs (Mandatory... 503 of Publicc Law 100-71. The ``Mandatory Guidelines for Federal Workplace Drug Testing Programs...

  9. 76 FR 31969 - Current List of Laboratories and Instrumented Initial Testing Facilities Which Meet Minimum...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-02

    ... Engage in Urine Drug Testing for Federal Agencies AGENCY: Substance Abuse and Mental Health Services... the standards of the Mandatory Guidelines for Federal Workplace Drug Testing Programs (Mandatory... ``Mandatory Guidelines for Federal Workplace Drug Testing Programs'', as amended in the revisions listed above...

  10. 78 FR 314 - Current List of Laboratories and Instrumented Initial Testing Facilities Which Meet Minimum...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-03

    ... Engage in Urine Drug Testing for Federal Agencies AGENCY: Substance Abuse and Mental Health Services... the standards of the Mandatory Guidelines for Federal Workplace Drug Testing Programs (Mandatory... ``Mandatory Guidelines for Federal Workplace Drug Testing Programs'', as amended in the revisions listed above...

  11. 75 FR 67749 - Current List of Laboratories and Instrumented Initial Testing Facilities Which Meet Minimum...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-03

    ... Engage in Urine Drug Testing for Federal Agencies AGENCY: Substance Abuse and Mental Health Services... the standards of the Mandatory Guidelines for Federal Workplace Drug Testing Programs (Mandatory... 100-71. The ``Mandatory Guidelines for Federal Workplace Drug Testing Programs,'' as amended in the...

  12. 78 FR 14100 - Current List of Laboratories and Instrumented Initial Testing Facilities Which Meet Minimum...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-04

    ... Engage in Urine Drug Testing for Federal Agencies AGENCY: Substance Abuse and Mental Health Services... the standards of the Mandatory Guidelines for Federal Workplace Drug Testing Programs (Mandatory... ``Mandatory Guidelines for Federal Workplace Drug Testing Programs'', as amended in the revisions listed above...

  13. 46 CFR 16.230 - Random testing requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... programs for the chemical testing for dangerous drugs on a random basis of crewmembers on inspected vessels... establish programs for the chemical testing for dangerous drugs on a random basis of crewmembers on... random drug testing shall be made by a scientifically valid method, such as a random number table or a...

  14. 77 FR 69642 - Current List of Laboratories and Instrumented Initial Testing Facilities Which Meet Minimum...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-20

    ... Engage in Urine Drug Testing for Federal Agencies AGENCY: Substance Abuse and Mental Health Services... the standards of the Mandatory Guidelines for Federal Workplace Drug Testing Programs (Mandatory... ``Mandatory Guidelines for Federal Workplace Drug Testing Programs'', as amended in the revisions listed above...

  15. 78 FR 66034 - Current List of Laboratories and Instrumented Initial Testing Facilities Which Meet Minimum...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-04

    ... Engage in Urine Drug Testing For Federal Agencies AGENCY: Substance Abuse and Mental Health Services... the standards of the Mandatory Guidelines for Federal Workplace Drug Testing Programs (Mandatory... 503 of Public Law 100-71. The ``Mandatory Guidelines for Federal Workplace Drug Testing Programs,'' as...

  16. 77 FR 5037 - Current List of Laboratories and Instrumented Initial Testing Facilities Which Meet Minimum...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-01

    ... Engage in Urine Drug Testing for Federal Agencies AGENCY: Substance Abuse and Mental Health Services... the standards of the Mandatory Guidelines for Federal Workplace Drug Testing Programs (Mandatory... ``Mandatory Guidelines for Federal Workplace Drug Testing Programs'', as amended in the revisions listed above...

  17. 76 FR 75889 - Current List of Laboratories and Instrumented Initial Testing Facilities Which Meet Minimum...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-05

    ... Engage in Urine Drug Testing for Federal Agencies AGENCY: Substance Abuse and Mental Health Services... the standards of the Mandatory Guidelines for Federal Workplace Drug Testing Programs (Mandatory... ``Mandatory Guidelines for Federal Workplace Drug Testing Programs'', as amended in the revisions listed above...

  18. 46 CFR 16.230 - Random testing requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... programs for the chemical testing for dangerous drugs on a random basis of crewmembers on inspected vessels... establish programs for the chemical testing for dangerous drugs on a random basis of crewmembers on... random drug testing shall be made by a scientifically valid method, such as a random number table or a...

  19. 77 FR 60449 - Current List of Laboratories and Instrumented Initial Testing Facilities Which Meet Minimum...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-03

    ... Engage in Urine Drug Testing for Federal Agencies AGENCY: Substance Abuse and Mental Health Services... the standards of the Mandatory Guidelines for Federal Workplace Drug Testing Programs (Mandatory... ``Mandatory Guidelines for Federal Workplace Drug Testing Programs'', as amended in the revisions listed above...

  20. 77 FR 26022 - Current List of Laboratories and Instrumented Initial Testing Facilities Which Meet Minimum...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-02

    ... Engage in Urine Drug Testing for Federal Agencies AGENCY: Substance Abuse and Mental Health Services... the standards of the Mandatory Guidelines for Federal Workplace Drug Testing Programs (Mandatory... ``Mandatory Guidelines for Federal Workplace Drug Testing Programs'', as amended in the revisions listed above...

  1. 76 FR 61110 - Current List of Laboratories and Instrumented Initial Testing Facilities Which Meet Minimum...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-03

    ... Engage in Urine Drug Testing for Federal Agencies AGENCY: Substance Abuse and Mental Health Services... the standards of the Mandatory Guidelines for Federal Workplace Drug Testing Programs (Mandatory... ``Mandatory Guidelines for Federal Workplace Drug Testing Programs,'' as amended in the revisions listed above...

  2. 77 FR 32653 - Current List of Laboratories and Instrumented Initial Testing Facilities Which Meet Minimum...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-01

    ... Engage in Urine Drug Testing for Federal Agencies AGENCY: Substance Abuse and Mental Health Services... the standards of the Mandatory Guidelines for Federal Workplace Drug Testing Programs (Mandatory... 100-71. The ``Mandatory Guidelines for Federal Workplace Drug Testing Programs'', as amended in the...

  3. 78 FR 54903 - Current List of Laboratories and Instrumented Initial Testing Facilities Which Meet Minimum...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-06

    ... Engage in Urine Drug Testing for Federal Agencies AGENCY: Substance Abuse and Mental Health Services... the standards of the Mandatory Guidelines for Federal Workplace Drug Testing Programs (Mandatory... 503 of Public Law 100-71. The ``Mandatory Guidelines for Federal Workplace Drug Testing Programs,'' as...

  4. 76 FR 18770 - Current List of Laboratories and Instrumented Initial Testing Facilities Which Meet Minimum...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-05

    ... Engage in Urine Drug Testing for Federal Agencies AGENCY: Substance Abuse and Mental Health Services... the standards of the Mandatory Guidelines for Federal Workplace Drug Testing Programs (Mandatory... ``Mandatory Guidelines for Federal Workplace Drug Testing Programs,'' as amended in the revisions listed above...

  5. 76 FR 40924 - Current List of Laboratories and Instrumented Initial Testing Facilities Which Meet Minimum...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-12

    ... Engage in Urine Drug Testing for Federal Agencies AGENCY: Substance Abuse and Mental Health Services... the standards of the Mandatory Guidelines for Federal Workplace Drug Testing Programs (Mandatory... ``Mandatory Guidelines for Federal Workplace Drug Testing Programs'', as amended in the revisions listed above...

  6. 76 FR 54477 - Current List of Laboratories and Instrumented Initial Testing Facilities Which Meet Minimum...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-01

    ... Engage in Urine Drug Testing for Federal Agencies AGENCY: Substance Abuse and Mental Health Services... the standards of the Mandatory Guidelines for Federal Workplace Drug Testing Programs (Mandatory... ``Mandatory Guidelines for Federal Workplace Drug Testing Programs'', as amended in the revisions listed above...

  7. 78 FR 19500 - Current List of Laboratories and Instrumented Initial Testing Facilities Which Meet Minimum...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-01

    ... Engage in Urine Drug Testing for Federal Agencies AGENCY: Substance Abuse and Mental Health Services... the standards of the Mandatory Guidelines for Federal Workplace Drug Testing Programs (Mandatory... ``Mandatory Guidelines for Federal Workplace Drug Testing Programs'', as amended in the revisions listed above...

  8. 76 FR 46309 - Current List of Laboratories and Instrumented Initial Testing Facilities Which Meet Minimum...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-02

    ... Engage in Urine Drug Testing for Federal Agencies AGENCY: Substance Abuse and Mental Health Services... the standards of the Mandatory Guidelines for Federal Workplace Drug Testing Programs (Mandatory... ``Mandatory Guidelines for Federal Workplace Drug Testing Programs'', as amended in the revisions listed above...

  9. 76 FR 6147 - Current List of Laboratories and Instrumented Initial Testing Facilities Which Meet Minimum...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-03

    ... Engage in Urine Drug Testing for Federal Agencies AGENCY: Substance Abuse and Mental Health Services... the standards of the Mandatory Guidelines for Federal Workplace Drug Testing Programs (Mandatory... ``Mandatory Guidelines for Federal Workplace Drug Testing Programs'', as amended in the revisions listed above...

  10. 76 FR 11802 - Current List of Laboratories and Instrumented Initial Testing Facilities Which Meet Minimum...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-03

    ... Engage in Urine Drug Testing for Federal Agencies AGENCY: Substance Abuse and Mental Health Services... the standards of the Mandatory Guidelines for Federal Workplace Drug Testing Programs (Mandatory... ``Mandatory Guidelines for Federal Workplace Drug Testing Programs'', as amended in the revisions listed above...

  11. 77 FR 71605 - Current List of Laboratories and Instrumented Initial Testing Facilities Which Meet Minimum...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-03

    ... Engage in Urine Drug Testing for Federal Agencies AGENCY: Substance Abuse and Mental Health Services... the standards of the Mandatory Guidelines for Federal Workplace Drug Testing Programs (Mandatory... 100-71. The ``Mandatory Guidelines for Federal Workplace Drug Testing Programs'', as amended in the...

  12. 77 FR 39501 - Current List of Laboratories and Instrumented Initial Testing Facilities Which Meet Minimum...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-03

    ... Engage in Urine Drug Testing for Federal Agencies AGENCY: Substance Abuse and Mental Health Services... the standards of the Mandatory Guidelines for Federal Workplace Drug Testing Programs (Mandatory... ``Mandatory Guidelines for Federal Workplace Drug Testing Programs'', as amended in the revisions listed above...

  13. 78 FR 33429 - Current List of Laboratories and Instrumented Initial Testing Facilities Which Meet Minimum...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-04

    ... Engage in Urine Drug Testing for Federal Agencies AGENCY: Substance Abuse and Mental Health Services... the standards of the Mandatory Guidelines for Federal Workplace Drug Testing Programs (Mandatory... ``Mandatory Guidelines for Federal Workplace Drug Testing Programs'', as amended in the revisions listed above...

  14. 78 FR 25461 - Current List of Laboratories and Instrumented Initial Testing Facilities Which Meet Minimum...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-01

    ... Engage in Urine Drug Testing for Federal Agencies AGENCY: Substance Abuse and Mental Health Services... the standards of the Mandatory Guidelines for Federal Workplace Drug Testing Programs (Mandatory... ``Mandatory Guidelines for Federal Workplace Drug Testing Programs'', as amended in the revisions listed above...

  15. 77 FR 12862 - Current List of Laboratories and Instrumented Initial Testing Facilities Which Meet Minimum...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-02

    ... Engage in Urine Drug Testing for Federal Agencies AGENCY: Substance Abuse and Mental Health Services... the standards of the Mandatory Guidelines for Federal Workplace Drug Testing Programs (Mandatory... ``Mandatory Guidelines for Federal Workplace Drug Testing Programs'', as amended in the revisions listed above...

  16. 78 FR 7795 - Current List of Laboratories and Instrumented Initial Testing Facilities Which Meet Minimum...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-04

    ... Engage in Urine Drug Testing for Federal Agencies AGENCY: Substance Abuse and Mental Health Services... the standards of the Mandatory Guidelines for Federal Workplace Drug Testing Programs (Mandatory... Public Law 100-71. The ``Mandatory Guidelines for Federal Workplace Drug Testing Programs'', as amended...

  17. Forward Skirt Structural Testing on the Space Launch System (SLS) Program

    NASA Technical Reports Server (NTRS)

    Lohrer, Joe; Wright, R. D.

    2016-01-01

    Introduction: (a) Structural testing was performed to evaluate Space Shuttle heritage forward skirts for use on the Space Launch System (SLS) program, (b) Testing was required because SLS loads are approximately 35% greater than shuttle loads; and (c) Two forwards skirts were tested to failure.

  18. 10 CFR 1021.212 - Research, development, demonstration, and testing.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... testing. (a) This section applies to the adoption and application of programs that involve research, development, demonstration, and testing for new technologies (40 CFR 1502.4(c)(3)). Adoption of such programs... 10 Energy 4 2014-01-01 2014-01-01 false Research, development, demonstration, and testing. 1021...

  19. 10 CFR 1021.212 - Research, development, demonstration, and testing.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... testing. (a) This section applies to the adoption and application of programs that involve research, development, demonstration, and testing for new technologies (40 CFR 1502.4(c)(3)). Adoption of such programs... 10 Energy 4 2012-01-01 2012-01-01 false Research, development, demonstration, and testing. 1021...

  20. 10 CFR 1021.212 - Research, development, demonstration, and testing.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... testing. (a) This section applies to the adoption and application of programs that involve research, development, demonstration, and testing for new technologies (40 CFR 1502.4(c)(3)). Adoption of such programs... 10 Energy 4 2013-01-01 2013-01-01 false Research, development, demonstration, and testing. 1021...

  1. 10 CFR 1021.212 - Research, development, demonstration, and testing.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... testing. (a) This section applies to the adoption and application of programs that involve research, development, demonstration, and testing for new technologies (40 CFR 1502.4(c)(3)). Adoption of such programs... 10 Energy 4 2011-01-01 2011-01-01 false Research, development, demonstration, and testing. 1021...

  2. 10 CFR 1021.212 - Research, development, demonstration, and testing.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... testing. (a) This section applies to the adoption and application of programs that involve research, development, demonstration, and testing for new technologies (40 CFR 1502.4(c)(3)). Adoption of such programs... 10 Energy 4 2010-01-01 2010-01-01 false Research, development, demonstration, and testing. 1021...

  3. Costs of voluntary rapid HIV testing and counseling in jails in 4 states--advancing HIV Prevention Demonstration Project, 2003-2006.

    PubMed

    Shrestha, Ram K; Sansom, Stephanie L; Richardson-Moore, April; French, P Tyler; Scalco, Beth; Lalota, Marlene; Llanas, Michelle; Stodola, James; Macgowan, Robin; Margolis, Andrew

    2009-02-01

    To assess the costs of rapid human immunodeficiency virus (HIV) testing and counseling to identify new diagnoses of HIV infection among jail inmates. We obtained program costs and testing outcomes from rapid HIV testing and counseling services provided in jails from March 1, 2004, through February 28, 2005, in Florida, Louisiana, New York, and Wisconsin. We obtained annual program delivery costs-fixed and variable costs-from each project area. We estimated the average cost of providing counseling and testing to HIV-negative and HIV-infected inmates and estimated the cost per newly diagnosed HIV infection. In the 4 project areas, 17,433 inmates (range, 2185-6463) were tested: HIV infection was diagnosed for 152 inmates (range, 4-81). The average cost of testing ranged from $29.46 to $44.98 for an HIV-negative inmate and from $71.37 to $137.72 for an HIV-infected inmate. The average cost per newly diagnosed HIV infection ranged from $2,451 to $25,288. Variable costs were 61% to 86% of total costs. The cost of identifying jail inmates with newly diagnosed HIV infection by using rapid HIV testing varied according to the prevalence of undiagnosed HIV infection among inmates tested in project areas. Variations in the cost of testing HIV-negative and HIV-infected inmates were because of the differences in wages, travel to the jails, and the amount of time spent on counseling and testing. Program managers can use these data to gauge the cost of initiating counseling and testing programs in jails or to streamline current programs.

  4. Faculty Forum: The GRE Analytical Writing Test-- Description and Utilization

    ERIC Educational Resources Information Center

    Briihl, Deborah S.; Wasieleski, David T.

    2007-01-01

    The authors surveyed graduate programs to see how they use the Graduate Record Examination Analytic Writing (GRE-AW) Test. Only 35% of the graduate programs that responded use the GRE-AW test in their admission policy; of the programs not using it, most do not plan to do so. The programs using the GRE-AW rated it as medium or low in importance in…

  5. Evaluation of verification and testing tools for FORTRAN programs

    NASA Technical Reports Server (NTRS)

    Smith, K. A.

    1980-01-01

    Two automated software verification and testing systems were developed for use in the analysis of computer programs. An evaluation of the static analyzer DAVE and the dynamic analyzer PET, which are used in the analysis of FORTRAN programs on Control Data (CDC) computers, are described. Both systems were found to be effective and complementary, and are recommended for use in testing FORTRAN programs.

  6. Poster - 09: A MATLAB-based Program for Automated Quality Assurance of a Prostate Brachytherapy Ultrasound System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Poon, Justin; Sabondjian, Eric; Sankreacha, Raxa

    Purpose: A robust Quality Assurance (QA) program is essential for prostate brachytherapy ultrasound systems due to the importance of imaging accuracy during treatment and planning. Task Group 128 of the American Association of Physicists in Medicine has recommended a set of QA tests covering grayscale visibility, depth of penetration, axial and lateral resolution, distance measurement, area measurement, volume measurement, and template/electronic grid alignment. Making manual measurements on the ultrasound system can be slow and inaccurate, so a MATLAB program was developed for automation of the described tests. Methods: Test images were acquired using a BK Medical Flex Focus 400 ultrasoundmore » scanner and 8848 transducer with the CIRS Brachytherapy QA Phantom – Model 045A. For each test, the program automatically segments the inputted image(s), makes the appropriate measurements, and indicates if the test passed or failed. The program was tested by analyzing two sets of images, where the measurements from the first set were used as baseline values. Results: The program successfully analyzed the images for each test and determined if any action limits were exceeded. All tests passed – the measurements made by the program were consistent and met the requirements outlined by Task Group 128. Conclusions: The MATLAB program we have developed can be used for automated QA of an ultrasound system for prostate brachytherapy. The GUI provides a user-friendly way to analyze images without the need for any manual measurement, potentially removing intra- and inter-user variability for more consistent results.« less

  7. Cost-effectiveness of rapid HCV testing and simultaneous rapid HCV and HIV testing in substance abuse treatment programs

    PubMed Central

    Schackman, Bruce R.; Leff, Jared A.; Barter, Devra M.; DiLorenzo, Madeline A.; Feaster, Daniel J.; Metsch, Lisa R.; Freedberg, Kenneth A.; Linas, Benjamin P.

    2014-01-01

    Aims To evaluate the cost-effectiveness of rapid hepatitis C virus (HCV) and simultaneous HCV/HIV antibody testing in substance abuse treatment programs. Design We used a decision analytic model to compare the cost-effectiveness of no HCV testing referral or offer, off-site HCV testing referral, on-site rapid HCV testing offer, and on-site rapid HCV and HIV testing offer. Base case inputs included 11% undetected chronic HCV, 0.4% undetected HIV, 35% HCV co-infection among HIV-infected, 53% linked to HCV care after testing antibody positive, and 67% linked to HIV care. Disease outcomes were estimated from established computer simulation models of HCV (HEP-CE) and HIV (CEPAC). Setting and Participants Data on test acceptance and costs were from a national randomized trial of HIV testing strategies conducted at 12 substance abuse treatment programs in the USA. Measurements Lifetime costs (2011 US dollars) and quality-adjusted life years (QALYs) discounted at 3% annually; incremental cost-effectiveness ratios (ICERs) Findings On-site rapid HCV testing had an ICER of $18,300/QALY compared with no testing, and was more efficient than (dominated) off-site HCV testing referral. On-site rapid HCV and HIV testing had an ICER of $64,500/QALY compared with on-site rapid HCV testing alone. In one and two-way sensitivity analyses, the ICER of on-site rapid HCV and HIV testing remained <$100,000/QALY, except when undetected HIV prevalence was <0.1% or when we assumed frequent HIV testing elsewhere. The ICER remained <$100,000/QALY in approximately 90% of probabilistic sensitivity analyses. Conclusions On-site rapid hepatitis C virus and HIV testing in substance abuse treatment programs is cost-effective at a <$100,000/ quality-adjusted life years threshold. PMID:25291977

  8. A street intercept survey to assess HIV-testing attitudes and behaviors.

    PubMed

    Rotheram-Borus, M J; Mann, T; Newman, P A; Grusky, O; Frerichs, R R; Wight, R G; Kuklinski, M

    2001-06-01

    Nationally, it has been estimated that 44% of adults in the United States have been tested for HIV, with substantial individual and community-level variations in HIV-testing attitudes and behaviors. HIV-testing behaviors and intentions and attitudes toward HIV testing, particularly toward home tests, were assessed among 385 adults recruited in a street intercept survey from a gay-identified agency, a substance-abuse treatment program, and inner-city community venues (a shopping mall and community center). Across these Los Angeles sites, the proportion of persons reported being tested for HIV in their lifetime (77%) was higher than the national estimate. Gay-identified agency (88%) and substance-abuse treatment program participants (99%) were more likely to have been tested than were the community participants (67%). Participants from a gay-identified agency were more likely to have had an anonymous test (51%) than were those from a substance-abuse treatment program (25%) or community sites (24%). Attitudes toward HIV testing, including mail-in home-test kits and instant home tests, were very positive. Most participants were willing to pay about $20 for a home-test kit. Participants from the community sites (82%) and the substance-abuse treatment program participants (87%) endorsed notification of HIV status to health departments and sexual partners more than did participants from the gay identified agency (48%). The street intercept survey appears to be a quick and feasible method to assess HIV testing in urban areas.

  9. On-site bundled rapid HIV/HCV testing in substance use disorder treatment programs: study protocol for a hybrid design randomized controlled trial.

    PubMed

    Frimpong, Jemima A; D'Aunno, Thomas; Perlman, David C; Strauss, Shiela M; Mallow, Alissa; Hernandez, Diana; Schackman, Bruce R; Feaster, Daniel J; Metsch, Lisa R

    2016-03-03

    More than 1.2 million people in the United States are living with human immunodeficiency virus (HIV), and 3.2 million are living with hepatitis C virus (HCV). An estimated 25 % of persons living with HIV also have HCV. It is therefore of great public health importance to ensure the prompt diagnosis of both HIV and HCV in populations that have the highest prevalence of both infections, including individuals with substance use disorders (SUD). In this theory-driven, efficacy-effectiveness-implementation hybrid study, we will develop and test an on-site bundled rapid HIV/HCV testing intervention for SUD treatment programs. Its aim is to increase the receipt of HIV and HCV test results among SUD treatment patients. Using a rigorous process involving patients, providers, and program managers, we will incorporate rapid HCV testing into evidence-based HIV testing and linkage to care interventions. We will then test, in a randomized controlled trial, the extent to which this bundled rapid HIV/HCV testing approach increases receipt of HIV and HCV test results. Lastly, we will conduct formative research to understand the barriers to, and facilitators of, the adoption, implementation, and sustainability of the bundled rapid testing strategy in SUD treatment programs. Novel approaches that effectively integrate on-site rapid HIV and rapid HCV testing are needed to address both the HIV and HCV epidemics. If feasible and efficacious, bundled rapid HIV/HCV testing may offer a scalable, potentially cost-effective approach to testing high-risk populations, such as patients of SUD treatment programs. It may ultimately lead to improved linkage to care and progress through the HIV and HCV care and treatment cascades. ClinicalTrials.gov: NCT02355080 . (30 January 2015).

  10. A Structured Career Intervention Program for Academically Challenged Students

    ERIC Educational Resources Information Center

    Salleh, Amla; Abdullah, Syed Mohamad; Mahmud, Zuria; Ghavifekr, Simin; Ishak, Noriah

    2013-01-01

    A study was carried out to test the effects of a 2-week structured intervention program on academically challenged students' career development. A quasi-experimental study was designed using pre-tests, post-tests, and a control group approach to examine the effects of the intervention program. Data were collected from both the experimental and…

  11. 14 CFR 120.225 - How to implement an alcohol testing program.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... principal place of business prior to starting operations, (ii) Implement an FAA alcohol testing program no... District Office nearest to your principal place of business. (3) An air traffic control facility not... Specification,(ii) Implement an FAA alcohol testing program no later than the date you start operations, and...

  12. 41 CFR 300-90.2 - Who may authorize test programs?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 41 Public Contracts and Property Management 4 2014-07-01 2014-07-01 false Who may authorize test programs? 300-90.2 Section 300-90.2 Public Contracts and Property Management Federal Travel Regulation System GENERAL AGENCY REQUIREMENTS 90-TELEWORK TRAVEL EXPENSES TEST PROGRAMS § 300-90.2 Who may authorize...

  13. EVALUATING PROGRAMMED TEST INTERPRETATION USING EMOTIONAL AROUSAL AS A CRITERION.

    ERIC Educational Resources Information Center

    FORSTER, JERALD R.

    THE QUESTION AS TO WHETHER OR NOT THE EMOTIONAL ASPECTS OF TEST INTERPRETATION MAKE IT INAPPROPRIATE FOR PROGRAMED METHODS WAS EXAMINED BY TWO METHODS OF TEST RESULT COMMUNICATION--PROGRAMED MATERIALS AND VERBAL COMMUNICATION BY A COUNSELOR. DEPENDENT VARIABLES WERE MEASURES OF EMOTIONAL AROUSAL RECORDED BY SKIN CONDUCTANCE UNITS AND THE GAIN IN…

  14. 76 FR 47518 - Energy Conservation Program: Treatment of “Smart” Appliances in Energy Conservation Standards and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-05

    ... Conservation Program: Treatment of ``Smart'' Appliances in Energy Conservation Standards and Test Procedures... well as in test procedures used to demonstrate compliance with DOE's standards and qualification as an... development of energy conservation standards and test procedures for DOE's Appliance Standards Program and the...

  15. 78 FR 63516 - Initial Test Program of Emergency Core Cooling Systems for New Boiling-Water Reactors

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-24

    ... NUCLEAR REGULATORY COMMISSION [NRC-2012-0134] Initial Test Program of Emergency Core Cooling....79.1, ``Initial Test Program of Emergency Core Cooling Systems for New Boiling-Water Reactors.'' This... emergency core cooling systems (ECCSs) for boiling- water reactors (BWRs) whose licenses are issued after...

  16. N.S. SAVANNAH, DRAFT OF FINAL SAFEGUARDS REPORT TEST, START-UP AND TRIALS, NEW YORK SHIPBUILDING CORPORATION

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1960-04-01

    The N. S. Savannah program for testing, start-up, and initial operation of all reactor and propulsion components and systems is discussed. Definitions of test phases are given and various stages of the test program are outlined. A list of tests for the various reactor, propulsion, and other system components is included. (C.J.G.)

  17. Dynamic testing for shuttle design verification

    NASA Technical Reports Server (NTRS)

    Green, C. E.; Leadbetter, S. A.; Rheinfurth, M. H.

    1972-01-01

    Space shuttle design verification requires dynamic data from full scale structural component and assembly tests. Wind tunnel and other scaled model tests are also required early in the development program to support the analytical models used in design verification. Presented is a design philosophy based on mathematical modeling of the structural system strongly supported by a comprehensive test program; some of the types of required tests are outlined.

  18. TESTING OF A 20-METER SOLAR SAIL SYSTEM

    NASA Technical Reports Server (NTRS)

    Gaspar, J. L.; Behun, V.; Mann, T.; Murphy D.; Macy, B.

    2005-01-01

    This paper describes the structural dynamic tests conducted in-vacuum on the Scalable Square Solar Sail (S(sup 4)) System 20-meter test article developed by ATK Space Systems as part of a ground demonstrator system development program funded by NASA's In-Space Propulsion program1-3. These tests were conducted for the purpose of validating analytical models that would be required by a flight test program to predict in space performance4. Specific tests included modal vibration tests on the solar sail system in a 1 Torr vacuum environment using various excitation locations and techniques including magnetic excitation at the sail quadrant corners, piezoelectric stack actuation at the mast roots, spreader bar excitation at the mast tips, and bi-morph piezoelectric patch actuation on the sail cords. The excitation methods were evaluated for their suitability to in-vacuum ground testing and their traceability to the development of on-orbit flight test techniques. The solar sail masts were also tested in ambient atmospheric conditions and these results are also discussed.

  19. TESTING OF A 20-METER SOLAR SAIL SYSTEM

    NASA Technical Reports Server (NTRS)

    Gaspar, Jim L.; Behun, Vaughan; Mann, Troy; Murphy, Dave; Macy, Brian

    2005-01-01

    This paper describes the structural dynamic tests conducted in-vacuum on the Scalable Square Solar Sail (S(sup 4)) System 20-meter test article developed by ATK Space Systems as part of a ground demonstrator system development program funded by NASA's In-Space Propulsion program. These tests were conducted for the purpose of validating analytical models that would be required by a flight test program to predict in space performance. Specific tests included modal vibration tests on the solar sail system in a 1 Torr vacuum environment using various excitation locations and techniques including magnetic excitation at the sail quadrant corners, piezoelectric stack actuation at the mast roots, spreader bar excitation at the mast tips, and bi-morph piezoelectric patch actuation on the sail cords. The excitation methods are evaluated for their suitability to in-vacuum ground testing and their traceability to the development of on-orbit flight test techniques. The solar sail masts were also tested in ambient atmospheric conditions and these results are also discussed.

  20. Injury rates, severity, and drug testing programs in small construction companies.

    PubMed

    Schofield, Katherine Elizabeth; Alexander, Bruce H; Gerberich, Susan Goodwin; Ryan, Andrew D

    2013-02-01

    Construction work is hazardous and workers consistently rank in the top of all occupations and industries for illicit drug and heavy alcohol use. Drug-testing programs were classified into three categories: no program, pre-employment/post-accident, and pre-employment/post-accident/random/suspicion. We analyzed workers' compensation claims from 1,360 construction companies over a six-year period to assess the possible association of testing program with injury rate. Compared to no program, results respectively were RR=0.85 (CI=0.72-1.0) and RR=0.97 (CI=0.86-1.10) for all injuries, and RR=0.78 (CI=0.60-1.03) and RR=1.01 (CI=0.86-1.19) for lost-time injuries. Variability of results was exhibited across trade and union status, among other categories. Drug-testing programs may be associated with lower, non-significant, injury rates in this population. Drug-testing programs may be associated with lower injury rates, but care should be exercised to ensure accurate injury reporting, characterize underlying safety practices of a company, and to determine quality and consistency of testing. Copyright © 2013 Elsevier Ltd. All rights reserved.

  1. A review of cryogenic testing performed by the thermochemical test branch, Manned Spacecraft Center in support of Apollo 13 and14

    NASA Technical Reports Server (NTRS)

    Propp, C. E.; Mcgee, J. M.

    1971-01-01

    The Apollo 13 anomaly provided considerable impetus for a variety of types of cryogenic and ignition tests. The logic of the various test program designs, the test techniques, and their final impact upon the investigation findings are described. In addition, several test programs initiated to determine the thermal performance and general performance characteristics of the redesigned Apollo 14 cryogenic storage system are presented.

  2. Space Station Freedom NiH2 cell testing program

    NASA Technical Reports Server (NTRS)

    Moore, Bruce; Frate, Dave

    1994-01-01

    Testing for the Space Station Freedom Nickel Hydrogen Cell Test Program began in 1990 at Crave Division, Naval Surface Warfare Center. The program has included receipt inspection, random vibration, acceptance, characterization, and life cycle testing of Ni-H2 cells in accordance with the NASA LeRC Interagency Order C-31001-J. A total of 400 Ni-H2 cells have been received at NAVSURFWARCENDIV Crane from three separate manufacturers; Yardney Technical Products (Yardney), Eagle Picher Industries (Eagle Picher), and Gates Energy Products (Gates). Of those, 308 cells distributed among 39 packs have undergone life cycle testing under a test regime simulating low earth orbit conditions. As of 30 September 1993, there are 252 cells assembled into 32 packs still on life cycle test. Since the beginning of the program, failed cells have been detected in all phases of testing. The failures include the following; seven 65 AmpHr and 81 AmpHr Yardney cells were found to be leaking KOH on receipt, one 65 AmpHr Eagle Picher cell failed the acceptance test, one 65 AmpHr Gates cell failed during the characterization test, and six 65 AmpHr Gates cells failed the random vibration test. Of the 39 life cycle packs, testing on seven packs, 56 cells, has been suspended because of low end of discharge voltages. All of the failed life cycle packs were cycled at 60% depth of discharge.

  3. Galileo environmental test and analysis program summary

    NASA Technical Reports Server (NTRS)

    Hoffman, A. R.

    1991-01-01

    This paper presents an overview of the Galileo Project's environmental test and analysis program during the spacecraft development phase - October 1978 through launch in October 1989. After describing the top-level objectives of the program, summaries of-the approach, requirements, and margins are provided. Examples of assembly- and system-level test results are given for both the pre-1986 (direct mission) testing and the post-1986 (Venus-Earth-Earth gravity assist mission) testing, including dynamic, thermal, electromagnetic compatibility (EMC), and magnetic. The approaches and results for verifying by analysis that the requirements of certain environments (e.g., radiation, micrometeoroids, and single event upsets) are satisfied are presented. The environmental program implemented on Galileo satisfied the spirit and intent of the requirements imposed by the Project during the spacecraft's development. The lessons learned from the Galileo environmental program are discussed in this paper.

  4. School Hearing Test Program.

    ERIC Educational Resources Information Center

    Environmental Protection Agency, Washington, DC. Office of Noise Abatement and Control.

    The document offers guidelines for administration of the Hearing Test Noise Education Program, a program to teach students the harmful effects of excessive moise on their hearing and learning ability. Section 1 outlines the program strategy in terms of program initiation, suggested program coordination, suggested coordinator's responsibilities,…

  5. Program Manager: Journal of the Defense Systems Management College. Volume 16, Number 3, May-June 1987

    DTIC Science & Technology

    1987-06-01

    redress a growingstrategic imbalance and provide an en- test pilots conducted a rigorous flight test during capability to penetrate Soviet program...ment career path for rated officers vidual rotates through assignments in ( pilots and navigators) is different from engineering, test and evaluation...pain. Acquiring the B-1B, or any other weapon system for that matter, entails developing, testing ard producing new technology. In any high-tech en

  6. Definition study for variable cycle engine testbed engine and associated test program

    NASA Technical Reports Server (NTRS)

    Vdoviak, J. W.

    1978-01-01

    The product/study double bypass variable cycle engine (VCE) was updated to incorporate recent improvements. The effect of these improvements on mission range and noise levels was determined. This engine design was then compared with current existing high-technology core engines in order to define a subscale testbed configuration that simulated many of the critical technology features of the product/study VCE. Detailed preliminary program plans were then developed for the design, fabrication, and static test of the selected testbed engine configuration. These plans included estimated costs and schedules for the detail design, fabrication and test of the testbed engine and the definition of a test program, test plan, schedule, instrumentation, and test stand requirements.

  7. Comparison of methods for estimating the cost of human immunodeficiency virus-testing interventions.

    PubMed

    Shrestha, Ram K; Sansom, Stephanie L; Farnham, Paul G

    2012-01-01

    The Centers for Disease Control and Prevention (CDC), Division of HIV/AIDS Prevention, spends approximately 50% of its $325 million annual human immunodeficiency virus (HIV) prevention funds for HIV-testing services. An accurate estimate of the costs of HIV testing in various settings is essential for efficient allocation of HIV prevention resources. To assess the costs of HIV-testing interventions using different costing methods. We used the microcosting-direct measurement method to assess the costs of HIV-testing interventions in nonclinical settings, and we compared these results with those from 3 other costing methods: microcosting-staff allocation, where the labor cost was derived from the proportion of each staff person's time allocated to HIV testing interventions; gross costing, where the New York State Medicaid payment for HIV testing was used to estimate program costs, and program budget, where the program cost was assumed to be the total funding provided by Centers for Disease Control and Prevention. Total program cost, cost per person tested, and cost per person notified of new HIV diagnosis. The median costs per person notified of a new HIV diagnosis were $12 475, $15 018, $2697, and $20 144 based on microcosting-direct measurement, microcosting-staff allocation, gross costing, and program budget methods, respectively. Compared with the microcosting-direct measurement method, the cost was 78% lower with gross costing, and 20% and 61% higher using the microcosting-staff allocation and program budget methods, respectively. Our analysis showed that HIV-testing program cost estimates vary widely by costing methods. However, the choice of a particular costing method may depend on the research question being addressed. Although program budget and gross-costing methods may be attractive because of their simplicity, only the microcosting-direct measurement method can identify important determinants of the program costs and provide guidance to improve efficiency.

  8. Cost effectiveness as applied to the Viking Lander systems-level thermal development test program

    NASA Technical Reports Server (NTRS)

    Buna, T.; Shupert, T. C.

    1974-01-01

    The economic aspects of thermal testing at the systems-level as applied to the Viking Lander Capsule thermal development program are reviewed. The unique mission profile and pioneering scientific goals of Viking imposed novel requirements on testing, including the development of a simulation technique for the Martian thermal environment. The selected approach included modifications of an existing conventional thermal vacuum facility, and improved test-operational techniques that are applicable to the simulation of the other mission phases as well, thereby contributing significantly to the cost effectiveness of the overall thermal test program.

  9. A Different Type of Test.

    ERIC Educational Resources Information Center

    Brady, Lisa

    2003-01-01

    Describes a successful random drug-testing program for athletes and students involved in school-sponsored activities at Hunterdon Central Regional High School in Flemington, New Jersey. Urges all high schools to implement a random drug-testing program. (PKP)

  10. The 1991 LLWAS anemometer test program

    NASA Astrophysics Data System (ADS)

    Phillips, Charles O.; Burnham, David; Jacobs, Leo; Hazen, David

    1992-09-01

    Performance tests of anemometers under icing and snow conditions were conducted during 1990-1991 on the test field at Rochester, MN and in icing chambers and wind tunnels at Sterling, VA. These tests were done for the FAA Low Level Windshear Alert System (LLWAS) program to test sensors for the next phase of LLWAS. Sensors from ten manufacturers were accepted into the test program from the respondents to the Commerce Business Daily. These sensors were required first to pass an icing chamber test in order to be field tested. The field tests lasted from Nov. 1990 to Jul. 1991. Afterwards, all sensors were sent to Sterling, VA for wind tunnel tests in September 1991. All units from the eight manufacturers that passed the icing chamber test were in the field test. A propeller/vane sensor that failed the icing chamber test was put in the field as a reference. All the units that passed were not affected by icing during the field test although a mechanical unit was affected by snow during one event. The propeller/vane was affected by icing during one event. Wind tunnel tests were done to check starting thresholds and calibration anomalies found in the field. It was concluded that there is no one winning technology that could be found from the tests.

  11. The development of a Flight Test Engineer's Workstation for the Automated Flight Test Management System

    NASA Technical Reports Server (NTRS)

    Tartt, David M.; Hewett, Marle D.; Duke, Eugene L.; Cooper, James A.; Brumbaugh, Randal W.

    1989-01-01

    The Automated Flight Test Management System (ATMS) is being developed as part of the NASA Aircraft Automation Program. This program focuses on the application of interdisciplinary state-of-the-art technology in artificial intelligence, control theory, and systems methodology to problems of operating and flight testing high-performance aircraft. The development of a Flight Test Engineer's Workstation (FTEWS) is presented, with a detailed description of the system, technical details, and future planned developments. The goal of the FTEWS is to provide flight test engineers and project officers with an automated computer environment for planning, scheduling, and performing flight test programs. The FTEWS system is an outgrowth of the development of ATMS and is an implementation of a component of ATMS on SUN workstations.

  12. Thermal performance of MSFC hot air collectors under natural and simulated conditions

    NASA Technical Reports Server (NTRS)

    Shih, K., Sr.

    1977-01-01

    The procedures used and the results obtained from an evaluation test program conducted to determine the thermal performance and structural characteristics of selected MSFC--designed hot air collectors under both real and simulated environmental conditions are described. Five collectors were tested in the three phased program. A series of outdoor tests were conducted to determine stagnation temperatures on a typical bright day and to determine each collector's ability to withstand these temperatures. Two of the collectors experienced structural deformation sufficient to eliminate them from the remainder of the test program. A series of outdoor tests to evaluate the thermal performance of collector S/N 10 under certain test conditions were performed followed by a series of indoor tests to evaluate the thermal performance of the collector under closely controlled simulated conditions.

  13. Inmate must take HIV test if he wants to enroll in program.

    PubMed

    1999-10-29

    An inmate cannot sue the Taylorville Correctional Center in Illinois under the Americans with Disabilities Act (ADA) for requiring an HIV test for enrollment in a prison program. [Name removed] wanted to participate in the prison's culinary arts program, but did not want to take the HIV test. The 7th U.S. Circuit Court of Appeals ruled that [name removed] was not a "qualified individual with a disability" and therefore could not sue under ADA. The policy justification for the HIV test, which is required of all inmates enrolling in the program, was not addressed by the court.

  14. Pressure vessel burst test program - Initial program paper

    NASA Technical Reports Server (NTRS)

    Cain, Maurice R.; Sharp, Douglas E.; Coleman, Michael D.; Webb, Bobby L.

    1990-01-01

    The current status of a pressure vessel burst test program, aimed at the study of the blast waves and fragmentation characteristics of ruptured gas-filled pressure vessels, is reported. The program includes a series of test plans, each involving multiple bursts with burst pressures ranging to 7500 psig. The discussion covers the identification of concerns and hazards, application of the data generated, and a brief review of the current methods for assessing vessel safety and burst parameters. Attention is also given to pretest activities, including completed vessel and facility/instrumentation preparation and results of completed preliminary burst tests.

  15. KC-135 winglet program overview

    NASA Technical Reports Server (NTRS)

    Barber, M. R.; Selegan, D.

    1982-01-01

    A joint NASA/USAF program was conducted to accomplish the following objectives: (1) evaluate the benefits that could be achieved from the application of winglets to KC-135 aircraft; and (2) determine the ability of wind tunnel tests and analytical analysis to predict winglet characteristics. The program included wind-tunnel development of a test winglet configuration; analytical predictions of the changes to the aircraft resulting from the application of the test winglet; and finally, flight tests of the developed configuration. Pressure distribution, loads, stability and control, buffet, fuel mileage, and flutter data were obtained to fulfill the objectives of the program.

  16. An experimental and theoretical investigation of deposition patterns from an agricultural airplane

    NASA Technical Reports Server (NTRS)

    Morris, D. J.; Croom, C. C.; Vandam, C. P.; Holmes, B. J.

    1984-01-01

    A flight test program has been conducted with a representative agricultural airplane to provide data for validating a computer program model which predicts aerially applied particle deposition. Test procedures and the data from this test are presented and discussed. The computer program features are summarized, and comparisons of predicted and measured particle deposition are presented. Applications of the computer program for spray pattern improvement are illustrated.

  17. French Flight Test Program LEA Status

    DTIC Science & Technology

    2010-09-01

    RTO-EN-AVT-185 17 - 1 French Flight Test Program LEA Status Francois FALEMPIN MBDA France 1 avenue Reaumur Le Plessis Robinson FRANCE ...TITLE AND SUBTITLE French Flight Test Program LEA Status 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT ...Bouchez, Nicolas Gascoin, Measurement for fuel reforming for scramjet thermal management: status of COMPARER project - AIAA-2009-7373. French

  18. Program documentation for the space environment test division post-test data reduction program (GNFLEX)

    NASA Technical Reports Server (NTRS)

    Jones, L. D.

    1979-01-01

    The Space Environment Test Division Post-Test Data Reduction Program processes data from test history tapes generated on the Flexible Data System in the Space Environment Simulation Laboratory at the National Aeronautics and Space Administration/Lyndon B. Johnson Space Center. The program reads the tape's data base records to retrieve the item directory conversion file, the item capture file and the process link file to determine the active parameters. The desired parameter names are read in by lead cards after which the periodic data records are read to determine parameter data level changes. The data is considered to be compressed rather than full sample rate. Tabulations and/or a tape for generating plots may be output.

  19. Training and certification program of the operating staff for a 90-day test of a regenerative life support system

    NASA Technical Reports Server (NTRS)

    1972-01-01

    Prior to beginning a 90-day test of a regenerative life support system, a need was identified for a training and certification program to qualify an operating staff for conducting the test. The staff was responsible for operating and maintaining the test facility, monitoring and ensuring crew safety, and implementing procedures to ensure effective mission performance with good data collection and analysis. The training program was designed to ensure that each operating staff member was capable of performing his assigned function and was sufficiently cross-trained to serve at certain other positions on a contingency basis. Complicating the training program were budget and schedule limitations, and the high level of sophistication of test systems.

  20. Substantiation Data for Advanced Beaded and Tubular Structural Panels. Volume 3: Testing

    NASA Technical Reports Server (NTRS)

    Hedges, P. C.; Greene, B. E.

    1974-01-01

    The test program is described, which was conducted to provide the necessary experimental data to verify the design and analysis methods developed for beaded and tubular panels. Test results are summarized and presented for all local buckling and full size panel tests. Selected representative test data from each of these tests is presented in detail. The results of this program established a valid analysis and design procedure for circular tube panels. Test results from three other configurations show deformational modes which are not adequately accounted for in the present analyses.

  1. A CLOSE LOOK AT THE IMPORTANCE AND PLACE OF TESTING IN THE FOREIGN LANGUAGE PROGRAM.

    ERIC Educational Resources Information Center

    BARRUTIA, RICHARD

    TESTING IS ESPECIALLY IMPORTANT IN FOREIGN LANGUAGE PROGRAMS BECAUSE THE NATURE OF AUDIOLINGUAL TEACHING REQUIRES GREAT AMOUNTS OF FEEDBACK, REINFORCEMENT, AND VERIFICATION. TESTS CAN MEASURE APTITUDE AND ACHIEVEMENT, CAN DIAGNOSE, AND, MOST IMPORTANT, CAN BE AN EFFECTIVE TEACHING TOOL. MANY TEACHING TECHNIQUES ARE EXCELLENT FOR TESTING AND SOME…

  2. CRTs and NRTs Together.

    ERIC Educational Resources Information Center

    Noggle, Nelson L.

    The potential use of criterion referenced tests (CRT) and norm referenced tests (NRT) in the same testing program is discussed. The advantages and disadvantages of each are listed, and the best solution, a merging, is proposed. To merge CRTs and NRTs into an overall testing program, meaningful and useful to all levels, consideration must be given…

  3. 40 CFR 86.1920 - What in-use testing information must I report to EPA?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... (CONTINUED) AIR PROGRAMS (CONTINUED) CONTROL OF EMISSIONS FROM NEW AND IN-USE HIGHWAY VEHICLES AND ENGINES Manufacturer-Run In-Use Testing Program for Heavy-Duty Diesel Engines § 86.1920 What in-use testing information... engine for which testing was completed during the calendar quarter. Alternatively, you may separately...

  4. Comparison of Physical Therapy Anatomy Performance and Anxiety Scores in Timed and Untimed Practical Tests

    ERIC Educational Resources Information Center

    Schwartz, Sarah M.; Evans, Cathy; Agur, Anne M.R.

    2015-01-01

    Students in health care professional programs face many stressful tests that determine successful completion of their program. Test anxiety during these high stakes examinations can affect working memory and lead to poor outcomes. Methods of decreasing test anxiety include lengthening the time available to complete examinations or evaluating…

  5. Tuberculosis Infection in Urban Adolescents: Results of a School-Based Testing Program.

    ERIC Educational Resources Information Center

    Barry, M. Anita; And Others

    1990-01-01

    Discusses a tuberculosis skin testing program introduced for seventh and tenth grade students in Boston (Massachusetts) public schools. Positivity rate was significantly higher in tenth grade students. Among those testing positive, the majority were born outside the United States. Results suggest that testing may identify a significant number of…

  6. 78 FR 79637 - Energy Conservation Program: Test Procedure for Set-Top Boxes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-31

    ... Energy Conservation Program: Test Procedure for Set-Top Boxes AGENCY: Office of Energy Efficiency and... Energy (DOE) withdraws a proposed rule published January 23, 2013 to establish a test procedure to... additional types of consumer products as covered products. (42 U.S.C. 6292(a)(20)) DOE may prescribe test...

  7. 76 FR 72332 - Energy Conservation Program: Test Procedure for Microwave Ovens

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-23

    ... Energy Conservation Program: Test Procedure for Microwave Ovens AGENCY: Office of Energy Efficiency and.... Department of Energy (DOE) published an interim final rule on March 9, 2011, amending its test procedures for... standby mode and off mode power use by microwave ovens. Those amendments incorporated into the DOE test...

  8. Validation of Linguistic and Communicative Oral Language Tests for Spanish-English Bilingual Programs.

    ERIC Educational Resources Information Center

    Politzer, Robert L.; And Others

    1983-01-01

    The development, administration, and scoring of a communicative test and its validation with tests of linguistic and sociolinguistic competence in English and Spanish are reported. Correlation with measures of home language use and school achievement are also presented, and issues of test validation for bilingual programs are discussed. (MSE)

  9. 24 CFR 200.935 - Administrator qualifications and procedures for HUD building products certification programs.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... guidelines in any quality assurance review: (1) ASQC Q9000-1-1994 Quality Management and Quality Assurance... Systems—Model for Quality Assurance in Final Inspection and Test; (5) ASQC Q9004-1-1994 Quality Management... in interpreting testing standards, test methods, evaluating test reports and quality control programs...

  10. 77 FR 126 - Current List of Laboratories and Instrumented Initial Testing Facilities Which Meet Minimum...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-03

    ... Engage in Urine Drug Testing for Federal Agencies AGENCY: Substance Abuse and Mental Health Services... certified to meet the standards of the Mandatory Guidelines for Federal Workplace Drug Testing Programs... ``Mandatory Guidelines for Federal Workplace Drug Testing Programs'', as amended in the revisions listed above...

  11. 75 FR 3153 - Drug and Alcohol Testing Program; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-20

    .... FAA-2008-0937; Amendment No. 120-0A, 135-117A] RIN 2120-AJ37 Drug and Alcohol Testing Program... Aviation Administration (FAA) is correcting its drug and alcohol testing regulations published on May 14... and alcohol testing requirements. The final rule was necessary to gather all of the existing drug and...

  12. Teaching Study Skills and Test-Taking Strategies to Elementary School Students.

    ERIC Educational Resources Information Center

    Beidel, Deborah C.; Turner, Samuel M.; Taylor-Ferreira, Jill C.

    1999-01-01

    Presents and evaluates a pilot program to reduce test anxiety and related social-evaluative concerns. The Testbusters program teaches effective study habits, study skills, and test-taking strategies for children in grades 4 through 7. Results indicate that Testbusters decreased general levels of test anxiety and improved overall grade point…

  13. Solar power satellite 50 kW VKS-7773 cw klystron evaluation

    NASA Technical Reports Server (NTRS)

    Larue, A. D.

    1977-01-01

    A test program for evaluating the electrical characteristics of a cw, 50 kW power output klystron at 2.45 GHz is described. The tube tested was an 8-cavity klystron, the VKS-7773 which had been in storage for seven years. Tests included preliminary testing of the tube, cold tests of microwave components, tests of the electromagnet, and first and second hot tests of the tube. During the second hot test, the tuner in the fifth cavity went down to air, preventing any further testing. Cause of failure is not known, and recommendations are to repair and modify the tube, then proceed with testing as before to meet program objectives.

  14. Association between frequency of telephonic contact and clinical testing for a large, geographically diverse diabetes disease management population.

    PubMed

    Coberley, Carter R; McGinnis, Matthew; Orr, Patty M; Coberley, Sadie S; Hobgood, Adam; Hamar, Brent; Gandy, Bill; Pope, James; Hudson, Laurel; Hara, Pam; Shurney, Dexter; Clarke, Janice L; Crawford, Albert; Goldfarb, Neil I

    2007-04-01

    Diabetes disease management (DM) programs strive to promote healthy behaviors, including obtaining hemoglobin A1c (A1c) and low-density lipoprotein (LDL) tests as part of standards of care. The purpose of this study was to examine the relationship between frequency of telephonic contact and A1c and LDL testing rates. A total of 245,668 members continuously enrolled in diabetes DM programs were evaluated for performance of an A1c or LDL test during their first 12 months in the programs. The association between the number of calls a member received and clinical testing rates was examined. Members who received four calls demonstrated a 24.1% and 21.5% relative increase in A1c and LDL testing rates, respectively, compared to members who received DM mailings alone. Response to the telephonic intervention as part of the diabetes DM programs was influenced by member characteristics including gender, age, and disease burden. For example, females who received four calls achieved a 27.7% and 23.6% increase in A1c and LDL testing, respectively, compared to females who received mailings alone; by comparison, males who were called achieved 21.2% and 19.9% relative increase in A1c and LDL testing, respectively, compared to those who received mailings alone. This study demonstrates a positive association between frequency of telephonic contact and increased performance of an A1c or LDL test in a large, diverse diabetes population participating in DM programs. The impact of member characteristics on the responsiveness to these programs provides DM program designers with knowledge for developing strategies to promote healthy behaviors and improve diabetes outcomes.

  15. Magnetic Testing, and Modeling, Simulation and Analysis for Space Applications

    NASA Technical Reports Server (NTRS)

    Boghosian, Mary; Narvaez, Pablo; Herman, Ray

    2012-01-01

    The Aerospace Corporation (Aerospace) and Lockheed Martin Space Systems (LMSS) participated with Jet Propulsion Laboratory (JPL) in the implementation of a magnetic cleanliness program of the NASA/JPL JUNO mission. The magnetic cleanliness program was applied from early flight system development up through system level environmental testing. The JUNO magnetic cleanliness program required setting-up a specialized magnetic test facility at Lockheed Martin Space Systems for testing the flight system and a testing program with facility for testing system parts and subsystems at JPL. The magnetic modeling, simulation and analysis capability was set up and performed by Aerospace to provide qualitative and quantitative magnetic assessments of the magnetic parts, components, and subsystems prior to or in lieu of magnetic tests. Because of the sensitive nature of the fields and particles scientific measurements being conducted by the JUNO space mission to Jupiter, the imposition of stringent magnetic control specifications required a magnetic control program to ensure that the spacecraft's science magnetometers and plasma wave search coil were not magnetically contaminated by flight system magnetic interferences. With Aerospace's magnetic modeling, simulation and analysis and JPL's system modeling and testing approach, and LMSS's test support, the project achieved a cost effective approach to achieving a magnetically clean spacecraft. This paper presents lessons learned from the JUNO magnetic testing approach and Aerospace's modeling, simulation and analysis activities used to solve problems such as remnant magnetization, performance of hard and soft magnetic materials within the targeted space system in applied external magnetic fields.

  16. [New guidelines in regard to cervical cancer screening].

    PubMed

    Vargas-Hernández, Víctor Manuel; Acosta-Altamirano, Gustavo; Moreno-Eutimio, Mario Adán; Vargas-Aguilar, Víctor Manuel

    2014-01-01

    Cancer screening programs have been successful in reducing the incidence and mortality due to cervical cancer. For more than a decade, the human papillomavirus test has been recommended as part of these programs, however, Pap tests is not currently recommended for women 65 years of age who participated adequately in screening programs, continuing with these screening programs is not needed. Screening programs will be different in special populations at greatest risk where tests are frequently needed or use of alternative methods.

  17. NASA Fastrac Engine Gas Generator Component Test Program and Results

    NASA Technical Reports Server (NTRS)

    Dennis, Henry J., Jr.; Sanders, T.

    2000-01-01

    Low cost access to space has been a long-time goal of the National Aeronautics and Space Administration (NASA). The Fastrac engine program was begun at NASA's Marshall Space Flight Center to develop a 60,000-pound (60K) thrust, liquid oxygen/hydrocarbon (LOX/RP), gas generator-cycle booster engine for a fraction of the cost of similar engines in existence. To achieve this goal, off-the-shelf components and readily available materials and processes would have to be used. This paper will present the Fastrac gas generator (GG) design and the component level hot-fire test program and results. The Fastrac GG is a simple, 4-piece design that uses well-defined materials and processes for fabrication. Thirty-seven component level hot-fire tests were conducted at MSFC's component test stand #116 (TS116) during 1997 and 1998. The GG was operated at all expected operating ranges of the Fastrac engine. Some minor design changes were required to successfully complete the test program as development issues arose during the testing. The test program data results and conclusions determined that the Fastrac GG design was well on the way to meeting the requirements of NASA's X-34 Pathfinder Program that chose the Fastrac engine as its main propulsion system.

  18. Cryo-vacuum testing of the JWST Integrated Science Instrument Module (SPIE)

    NASA Technical Reports Server (NTRS)

    Kimble, Randy A.; Vila, M. Begona; Van Campen, Julie; Birkmann, Stephan M.; Comber, Brian J.; Fatig, Curtis C.; Glasse, Alistair C. H.; Glazer, Stuart D.; Kelly, Douglas M.; Mann, Steven D.; hide

    2016-01-01

    In late 2015/early 2016, a major cryo-vacuum test was carried out for the Integrated Science Instrument Module (ISIM) of the James Webb Space Telescope (JWST). This test comprised the final cryo-certification and calibration test of the ISIM, after its ambient environmental test program (vibration, acoustics, EMI/EMC), and before its delivery for integration with the rest of the JWST observatory. Over the 108-day period of the round-the-clock test program, the full complement of ISIM flight instruments, structure, harness radiator, and electronics were put through a comprehensive program of thermal, optical, electrical, and operational tests. The test verified the health and excellent performance of the instruments and ISIM systems, proving the ISIM element's readiness for integration with the telescope. We report here on the context, goals, setup, execution, and key results for this critical JWST milestone.

  19. Development and Testing of a High Stability Engine Control (HISTEC) System

    NASA Technical Reports Server (NTRS)

    Orme, John S.; DeLaat, John C.; Southwick, Robert D.; Gallops, George W.; Doane, Paul M.

    1998-01-01

    Flight tests were recently completed to demonstrate an inlet-distortion-tolerant engine control system. These flight tests were part of NASA's High Stability Engine Control (HISTEC) program. The objective of the HISTEC program was to design, develop, and flight demonstrate an advanced integrated engine control system that uses measurement-based, real-time estimates of inlet airflow distortion to enhance engine stability. With improved stability and tolerance of inlet airflow distortion, future engine designs may benefit from a reduction in design stall-margin requirements and enhanced reliability, with a corresponding increase in performance and decrease in fuel consumption. This paper describes the HISTEC methodology, presents an aircraft test bed description (including HISTEC-specific modifications) and verification and validation ground tests. Additionally, flight test safety considerations, test plan and technique design and approach, and flight operations are addressed. Some illustrative results are presented to demonstrate the type of analysis and results produced from the flight test program.

  20. Space Launch System Base Heating Test: Sub-Scale Rocket Engine/Motor Design, Development & Performance Analysis

    NASA Technical Reports Server (NTRS)

    Mehta, Manish; Seaford, Mark; Kovarik, Brian; Dufrene, Aaron; Solly, Nathan

    2014-01-01

    ATA-002 Technical Team has successfully designed, developed, tested and assessed the SLS Pathfinder propulsion systems for the Main Base Heating Test Program. Major Outcomes of the Pathfinder Test Program: Reach 90% of full-scale chamber pressure Achieved all engine/motor design parameter requirements Reach steady plume flow behavior in less than 35 msec Steady chamber pressure for 60 to 100 msec during engine/motor operation Similar model engine/motor performance to full-scale SLS system Mitigated nozzle throat and combustor thermal erosion Test data shows good agreement with numerical prediction codes Next phase of the ATA-002 Test Program Design & development of the SLS OML for the Main Base Heating Test Tweak BSRM design to optimize performance Tweak CS-REM design to increase robustness MSFC Aerosciences and CUBRC have the capability to develop sub-scale propulsion systems to meet desired performance requirements for short-duration testing.

  1. Battery Test Manual For 48 Volt Mild Hybrid Electric Vehicles

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Walker, Lee Kenneth

    2017-03-01

    This manual details the U.S. Advanced Battery Consortium and U.S. Department of Energy Vehicle Technologies Program goals, test methods, and analysis techniques for a 48 Volt Mild Hybrid Electric Vehicle system. The test methods are outlined stating with characterization tests, followed by life tests. The final section details standardized analysis techniques for 48 V systems that allow for the comparison of different programs that use this manual. An example test plan is included, along with guidance to filling in gap table numbers.

  2. Minority Performance on the Naglieri Nonverbal Ability Test, Second Edition, versus the Cognitive Abilities Test, Form 6: One Gifted Program's Experience

    ERIC Educational Resources Information Center

    Giessman, Jacob A.; Gambrell, James L.; Stebbins, Molly S.

    2013-01-01

    The Naglieri Nonverbal Ability Test, Second Edition (NNAT2), is used widely to screen students for possible inclusion in talent development programs. The NNAT2 claims to provide a more culturally neutral evaluation of general ability than tests such as Form 6 of the Cognitive Abilities Test (CogAT6), which has Verbal and Quantitative batteries in…

  3. Reliability Programs for Nonelectronic Designs. Volume 2

    DTIC Science & Technology

    1983-04-01

    afforded. Differ- ences between critical and minor failures must be defined in the RFP so that the test need not be stopped for minor failures. However...not be afforded. Specialized test plans must be developed for nonelectronic equipment. First, differences between critical and minor failures must be...determined prior to initiating the test program so that the test need not be stopped for minor failures. Second, although the test must be interrupted

  4. 41 CFR 300-90.7 - What is the duration of test programs?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 41 Public Contracts and Property Management 4 2014-07-01 2014-07-01 false What is the duration of test programs? 300-90.7 Section 300-90.7 Public Contracts and Property Management Federal Travel Regulation System GENERAL AGENCY REQUIREMENTS 90-TELEWORK TRAVEL EXPENSES TEST PROGRAMS § 300-90.7 What is...

  5. 41 CFR 300-90.8 - What must we do to apply for a test program extension?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 41 Public Contracts and Property Management 4 2014-07-01 2014-07-01 false What must we do to apply for a test program extension? 300-90.8 Section 300-90.8 Public Contracts and Property Management Federal Travel Regulation System GENERAL AGENCY REQUIREMENTS 90-TELEWORK TRAVEL EXPENSES TEST PROGRAMS...

  6. 47 CFR 76.1700 - Records to be maintained by cable system operators.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... programming); § 76.1704 (proof-of-performance test data); and § 76.1706 (signal leakage logs and repair... children's programming); § 76.1704 (proof-of-performance test data); and § 76.1706 (signal leakage logs and... programming); § 76.1704 (proof-of-performance test data); and § 76.1706 (signal leakage logs and repair...

  7. Application of IUS equipment and experience to orbit transfer vehicles of the 90's

    NASA Astrophysics Data System (ADS)

    Bangsund, E.; Keeney, J.; Cowgill, E.

    1985-10-01

    This paper relates experiences with the IUS program and the application of that experience to Future Orbit Transfer Vehicles. More specifically it includes the implementation of the U.S. Air Force Space Division high reliability parts standard (SMASO STD 73-2C) and the component/system test standard (MIL-STD-1540A). Test results from the parts and component level testing and the resulting system level test program for fourteen IUS flight vehicles are discussed. The IUS program has had the highest compliance with these standards and thus offers a benchmark of experience for future programs demanding extreme reliability. In summary, application of the stringent parts standard has resulted in fewer failures during testing and the stringent test standard has eliminated design problems in the hardware. Both have been expensive in costs and schedules, and should be applied with flexibility.

  8. Energy efficient engine sector combustor rig test program

    NASA Technical Reports Server (NTRS)

    Dubiel, D. J.; Greene, W.; Sundt, C. V.; Tanrikut, S.; Zeisser, M. H.

    1981-01-01

    Under the NASA-sponsored Energy Efficient Engine program, Pratt & Whitney Aircraft has successfully completed a comprehensive combustor rig test using a 90-degree sector of an advanced two-stage combustor with a segmented liner. Initial testing utilized a combustor with a conventional louvered liner and demonstrated that the Energy Efficient Engine two-stage combustor configuration is a viable system for controlling exhaust emissions, with the capability to meet all aerothermal performance goals. Goals for both carbon monoxide and unburned hydrocarbons were surpassed and the goal for oxides of nitrogen was closely approached. In another series of tests, an advanced segmented liner configuration with a unique counter-parallel FINWALL cooling system was evaluated at engine sea level takeoff pressure and temperature levels. These tests verified the structural integrity of this liner design. Overall, the results from the program have provided a high level of confidence to proceed with the scheduled Combustor Component Rig Test Program.

  9. Space Shuttle main engine product improvement

    NASA Technical Reports Server (NTRS)

    Lucci, A. D.; Klatt, F. P.

    1985-01-01

    The current design of the Space Shuttle Main Engine has passed 11 certification cycles, amassed approximately a quarter million seconds of engine test time in 1200 tests and successfully launched the Space Shuttle 17 times of 51 engine launches through May 1985. Building on this extensive background, two development programs are underway at Rocketdyne to improve the flow of hot gas through the powerhead and evaluate the changes to increase the performance margins in the engine. These two programs, called Phase II+ and Technology Test Bed Precursor program are described. Phase II+ develops a two-tube hot-gas manifold that improves the component environment. The Precursor program will evaluate a larger throat main combustion chamber, conduct combustion stability testing of a baffleless main injector, fabricate an experimental weld-free heat exchanger tube, fabricate and test a high pressure oxidizer turbopump with an improved inlet, and develop and test methods for reducing temperature transients at start and shutdown.

  10. Evaluation program for secondary spacecraft cells: Initial evaluation tests of Gulton Industries, Incorporated, 9.0 ampere-hour nickel-cadmium spacecraft cells with auxiliary electrodes for the small astronomy Satellite (SAS-C)

    NASA Technical Reports Server (NTRS)

    Harkness, J. D.

    1975-01-01

    An evaluation test program was conducted to insure that all cells put into the life cycle program are of high quality by the screening of cells found to have electrolyte leakage, internal shorts, low capacity, or inability of any cell to recover its open-circuit voltage above 1.150 volts during the internal short test. Tests and results are described.

  11. State Test Programs Mushroom as NCLB Mandate Kicks in: Nearly Half of States Are Expanding Their Testing Programs to Additional Grades This School Year to Comply with the Federal No Child Left Behind Act

    ERIC Educational Resources Information Center

    Olson, Lynn

    2005-01-01

    Twenty-three states are expanding their testing programs to additional grades this school year to comply with the federal No Child Left Behind Act. In devising the new tests, most states have defied predictions and chosen to go beyond multiple-choice items, by including questions that ask students to construct their own responses. But many state…

  12. Principles of Work Sample Testing. 2. Evaluation of Personnel Testing Programs

    DTIC Science & Technology

    1979-04-01

    i ARI TECHNICAL REPORT VE TR-79-A9 Principles of Work Sample Testing: II. Evaluation of Personnel Testing Programs by Robert M. Guion BOWLING GREEN ...STATE UNIVERSITY .Bowling Green , Ohio 43403 April 1979 Contract DAHC 19-77-C-0007 UK 0-. Prepared for C-, LA. U.S. ARMY RESEARCH INSTITUTE w for the...NAME AND ADDRESS V.PROGRAM ELEMENT. PROJECT. TASK Bowl iiq Green ’tate UniversityV Bowlilnq Green , Ohio 4 340i3 11. CONTROLLING OFFICE NAME AND ADDRESS

  13. Saturn Apollo Program

    NASA Image and Video Library

    1961-02-04

    The Saturn project was approved on January 18, 1960 as a program of the highest national priority. The formal test program to prove out the clustered-booster concept was well underway. A series of static tests of the Saturn I booster (S-I stage) began June 3, 1960 at the Marshall Space Flight Center (MSFC). This photograph depicts the Saturn I S-I stage equipped with eight H-1 engines, being successfully test-fired on February 4, 1961. A Juno rocket is visible on the right side of the test stand.

  14. Testing electroexplosive devices by programmed pulsing techniques

    NASA Technical Reports Server (NTRS)

    Rosenthal, L. A.; Menichelli, V. J.

    1976-01-01

    A novel method for testing electroexplosive devices is proposed wherein capacitor discharge pulses, with increasing energy in a step-wise fashion, are delivered to the device under test. The size of the energy increment can be programmed so that firing takes place after many, or after only a few, steps. The testing cycle is automatically terminated upon firing. An energy-firing contour relating the energy required to the programmed step size describes the single-pulse firing energy and the possible sensitization or desensitization of the explosive device.

  15. Electric Propulsion Test & Evaluation Methodologies for Plasma in the Environments of Space and Testing (EP TEMPEST) (Briefing Charts)

    DTIC Science & Technology

    2015-04-01

    in the Environments of Space and Testing (EP TEMPEST ) - Program Review (Briefing Charts) 5a. CONTRACT NUMBER In-House 5b. GRANT NUMBER 5c...of Space and Testing (EP TEMPEST ) AFOSR T&E Program Review 13-17 April 2015 Dr. Daniel L. Brown In-Space Propulsion Branch (RQRS) Aerospace Systems...Statement A: Approved for public release; distribution is unlimited. EP TEMPEST (Lab Task, FY14-FY16) Program Goals and Objectives Title: Electric

  16. See, Test & Treat: A 5-Year Experience of Pathologists Driving Cervical and Breast Cancer Screening to Underserved and Underinsured Populations.

    PubMed

    Magnani, Barbarajean; Harubin, Beth; Katz, Judith F; Zuckerman, Andrea L; Strohsnitter, William C

    2016-12-01

    - See, Test & Treat is a pathologist-driven program to provide cervical and breast cancer screening to underserved and underinsured patient populations. This program is largely funded by the CAP Foundation (College of American Pathologists, Northfield, Illinois) and is a collaborative effort among several medical specialties united to address gaps in the current health care system. - To provide an outline for administering a See, Test & Treat program, using an academic medical center as a model for providing care and collating the results of 5 years of data on the See, Test & Treat program's findings. - Sources include data from patients seen at Tufts Medical Center (Boston, Massachusetts) who presented to the See, Test & Treat program and institutional data between 2010 and 2014 detailing the outline of how to organize and operationalize a volunteer cancer-screening program. - During the 5-year course of the program, 203 women were provided free cervical and breast cancer screening. Of the 169 patients who obtained Papanicolaou screening, 36 (21.3%) had abnormal Papanicolaou tests. In addition, 16 of 130 patients (12.3%) who underwent mammography had abnormal findings. - In general, women from ethnic populations have barriers that prevent them from participating in cancer screening. However, the CAP Foundation's See, Test & Treat program is designed to reduce those barriers for these women by providing care that addresses cultural, financial, and practical issues. Although screening programs are helpful in identifying those who need further treatment, obtaining further treatment for these patients continues to be a challenge.

  17. Implementing a routine, voluntary HIV testing program in a Massachusetts county prison.

    PubMed

    Liddicoat, Rebecca V; Zheng, Hui; Internicola, Jeanne; Werner, Barbara G; Kazianis, Arthur; Golan, Yoav; Rubinstein, Eric P; Freedberg, Kenneth A; Walensky, Rochelle P

    2006-11-01

    Although U.S. prison inmates have higher rates of HIV infection than the general population, most inmates are not routinely tested for HIV infection at prison entry. The study objective was to implement a routine, voluntary HIV testing program in a Massachusetts county prison. During admission, inmates were given group HIV pre-test counseling and were subsequently offered private HIV testing. This intervention was compared to a control period during which HIV testing was provided only upon inmate or physician request. Between November 2004 and April 2005, 1,004 inmates met inclusion criteria and were offered routine, voluntary HIV testing. Of these, 734 (73.1%) accepted, 2 (0.3%) were HIV-infected, and 457 (45.5%) had been tested for HIV in the previous year. The testing rate of 73.1% was significantly increased from the rate of 18.0% (318 of 1,723) during the control period (p<0.001). Among the inmates tested for HIV in the prior year, 78.2% had received their last HIV test in the prison setting. Careful attention should be paid to prevent redundancy of testing efforts in the prison population. Implementing a routine HIV testing program among prison inmates greatly increased testing rates compared to on-request testing.

  18. Space Nuclear Thermal Propulsion (SNTP) Air Force facility

    NASA Technical Reports Server (NTRS)

    Beck, David F.

    1993-01-01

    The Space Nuclear Thermal Propulsion (SNTP) Program is an initiative within the US Air Force to acquire and validate advanced technologies that could be used to sustain superior capabilities in the area or space nuclear propulsion. The SNTP Program has a specific objective of demonstrating the feasibility of the particle bed reactor (PBR) concept. The term PIPET refers to a project within the SNTP Program responsible for the design, development, construction, and operation of a test reactor facility, including all support systems, that is intended to resolve program technology issues and test goals. A nuclear test facility has been designed that meets SNTP Facility requirements. The design approach taken to meet SNTP requirements has resulted in a nuclear test facility that should encompass a wide range of nuclear thermal propulsion (NTP) test requirements that may be generated within other programs. The SNTP PIPET project is actively working with DOE and NASA to assess this possibility.

  19. Nuclear Test-Experimental Science: Annual report, fiscal year 1988

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Struble, G.L.; Donohue, M.L.; Bucciarelli, G.

    1988-01-01

    Fiscal year 1988 has been a significant, rewarding, and exciting period for Lawrence Livermore National Laboratory's nuclear testing program. It was significant in that the Laboratory's new director chose to focus strongly on the program's activities and to commit to a revitalized emphasis on testing and the experimental science that underlies it. It was rewarding in that revolutionary new measurement techniques were fielded on recent important and highly complicated underground nuclear tests with truly incredible results. And it was exciting in that the sophisticated and fundamental problems of weapons science that are now being addressed experimentally are yielding new challengesmore » and understanding in ways that stimulate and reward the brightest and best of scientists. During FY88 the program was reorganized to emphasize our commitment to experimental science. The name of the program was changed to reflect this commitment, becoming the Nuclear Test-Experimental Science (NTES) Program.« less

  20. Sodium Sulfur Technology Program Nastec

    NASA Technical Reports Server (NTRS)

    Highley, Bob; Somerville, W. Andrew

    1992-01-01

    The NaSTEC program focuses on developing currently available sodium sulfur cells for use in space applications and investigating the operational parameters of the cells. The specific goals of the program are to determine the operational parameters and verify safety limits of Na/S technology battery cells; test long term zero-g operation; and create a life test database. The program approach and ground and flight test objectives are described in textual and graphic form.

  1. Parachute Testing for the NASA X-38 Crew Return Vehicle

    NASA Technical Reports Server (NTRS)

    Stein, Jenny M.

    2005-01-01

    NASA's X-38 program was an in-house technology demonstration program to develop a Crew Return Vehicle (CRV) for the International Space Station capable of returning seven crewmembers to Earth when the Space Shuttle was not present at the station. The program, managed out of NASA's Johnson Space Center, was started in 1995 and was cancelled in 2003. Eight flights with a prototype atmospheric vehicle were successfully flown at Edwards Air Force Base, demonstrating the feasibility of a parachute landing system for spacecraft. The intensive testing conducted by the program included testing of large ram-air parafoils. The flight test techniques, instrumentation, and simulation models developed during the parachute test program culminated in the successful demonstration of a guided parafoil system to land a 25,000 Ib spacecraft. The test program utilized parafoils of sizes ranging from 750 to 7500 p. The guidance, navigation, and control system (GN&C) consisted of winches, laser or radar altimeter, global positioning system (GPS), magnetic compass, barometric altimeter, flight computer, and modems for uplink commands and downlink data. The winches were used to steer the parafoil and to perform the dynamic flare maneuver for a soft landing. The laser or radar altimeter was used to initiate the flare. In the event of a GPS failure, the software navigated by dead reckoning using the compass and barometric altimeter data. The GN&C test beds included platforms dropped from cargo aircraft, atmospheric vehicles released from a 8-52, and a Buckeye powered parachute. This paper will describe the test program and significant results.

  2. Society of Flight Test Engineers, Annual Symposium, 21st, Garden Grove, CA, Aug. 6-10, 1990, Proceedings

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1990-01-01

    The present conference on flight testing encompasses avionics, flight-testing programs, technologies for flight-test predictions and measurements, testing tools, analysis methods, targeting techniques, and flightline testing. Specific issues addressed include flight testing of a digital terrain-following system, a digital Doppler rate-of-descent indicator, a high-technology testbed, a low-altitude air-refueling flight-test program, techniques for in-flight frequency-response testing for helicopters, limit-cycle oscillation and flight-flutter testing, and the research flight test of a scaled unmanned air vehicle. Also addressed are AV-8B V/STOL performance analysis, incorporating pilot-response time in failure-case testing, the development of pitot static flightline testing, targeting techniques for ground-based hover testing, a low-profilemore » microsensor for aerodynamic pressure measurement, and the use of a variable-capacitance accelerometer for flight-test measurements.« less

  3. Summary of Downtown People Mover (DPM) Winterization Test Activities

    DOT National Transportation Integrated Search

    1982-01-01

    This report describes and summarizes the test activities and presents the results of a two-year winter operation test program for three technologically-different Automated Guideway Transit (AGT) systems. The basic objective of the program was to dete...

  4. Downtown People Mover (DPM) Winterization Test Demonstration : UMI

    DOT National Transportation Integrated Search

    1982-01-01

    This report describes and summarizes the test activities and presents the results of a two-year winter operation test program for three technologically-different Automated Guideway Transit (AGT) systems. The basic objective of the program was to dete...

  5. 42 CFR 493.801 - Condition: Enrollment and testing of samples.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... subpart. (2)(i) Designate the program(s) to be used for each specialty, subspecialty, and analyte or test... procedures, in accordance with § 493.1236(c)(1). (3) For each specialty, subspecialty and analyte or test...

  6. 42 CFR 493.801 - Condition: Enrollment and testing of samples.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... subpart. (2)(i) Designate the program(s) to be used for each specialty, subspecialty, and analyte or test... procedures, in accordance with § 493.1236(c)(1). (3) For each specialty, subspecialty and analyte or test...

  7. 42 CFR 493.801 - Condition: Enrollment and testing of samples.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... subpart. (2)(i) Designate the program(s) to be used for each specialty, subspecialty, and analyte or test... procedures, in accordance with § 493.1236(c)(1). (3) For each specialty, subspecialty and analyte or test...

  8. 42 CFR 493.801 - Condition: Enrollment and testing of samples.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... subpart. (2)(i) Designate the program(s) to be used for each specialty, subspecialty, and analyte or test... procedures, in accordance with § 493.1236(c)(1). (3) For each specialty, subspecialty and analyte or test...

  9. 42 CFR 493.801 - Condition: Enrollment and testing of samples.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... subpart. (2)(i) Designate the program(s) to be used for each specialty, subspecialty, and analyte or test... procedures, in accordance with § 493.1236(c)(1). (3) For each specialty, subspecialty and analyte or test...

  10. Privacy Impact Assessment for the Light-Duty In-Use Vehicle Testing Program Information System

    EPA Pesticide Factsheets

    EPA's Light-Duty In-Use Vehicle Testing Program Information System contains car owner names, addresses, vehicle identification numbers, etc. The EPA uses this information to recruit and test vehicles for emissions standards compliance.

  11. Drug Testing and the Evolution of Federal and State Regulation of Intercollegiate Athletics: A Chill Wind Blows.

    ERIC Educational Resources Information Center

    Schaller, William Lynch

    1991-01-01

    Discussion of drug testing in intercollegiate athletics programs looks at federal and state regulation of drug-testing programs as it affects student-athletes and, in comparison, the employer-employee relationship. Judicial approaches in student-athlete drug-testing cases are also examined. Increased federal regulation is seen as imminent. Steps…

  12. 78 FR 22895 - Test To Allow Customs Brokers To Pre-Certify Importers for Participation in the Importer Self...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-17

    ... pre-certify importers for participation in the Importer Self-Assessment (ISA) program. The test will be known as the Customs Broker Importer Self-Assessment Pre- Certification (Broker ISA PC) test. The... Importer Self-Assessment (ISA) program. The Broker Importer Self-Assessment Pre-Certification (ISA PC) test...

  13. Documentation and archiving of the Space Shuttle wind tunnel test data base. Volume 2: User's Guide to the Archived Data Base

    NASA Technical Reports Server (NTRS)

    Romere, Paul O.; Brown, Steve Wesley

    1995-01-01

    Development of the Space Shuttle necessitated an extensive wind tunnel test program, with the cooperation of all the major wind tunnels in the United States. The result was approximately 100,000 hours of Space Shuttle wind tunnel testing conducted for aerodynamics, heat transfer, and structural dynamics. The test results were converted into Chrysler DATAMAN computer program format to facilitate use by analysts, a very cost effective method of collecting the wind tunnel test results from many test facilities into one centralized location. This report provides final documentation of the Space Shuttle wind tunnel program. The two-volume set covers the evolution of Space Shuttle aerodynamic configurations and gives wind tunnel test data, titles of wind tunnel data reports, sample data sets, and instructions for accessing the digital data base.

  14. Documentation and archiving of the Space Shuttle wind tunnel test data base. Volume 1: Background and description

    NASA Technical Reports Server (NTRS)

    Romere, Paul O.; Brown, Steve Wesley

    1995-01-01

    Development of the space shuttle necessitated an extensive wind tunnel test program, with the cooperation of all the major wind tunnels in the United States. The result was approximately 100,000 hours of space shuttle wind tunnel testing conducted for aerodynamics, heat transfer, and structural dynamics. The test results were converted into Chrysler DATAMAN computer program format to facilitate use by analysts, a very cost effective method of collecting the wind tunnel test results from many test facilities into one centralized location. This report provides final documentation of the space shuttle wind tunnel program. The two-volume set covers evolution of space shuttle aerodynamic configurations and gives wind tunnel test data, titles of wind tunnel data reports, sample data sets, and instructions for accessing the digital data base.

  15. Main Propulsion Test Article (MPTA)

    NASA Technical Reports Server (NTRS)

    Snoddy, Cynthia

    2010-01-01

    Scope: The Main Propulsion Test Article integrated the main propulsion subsystem with the clustered Space Shuttle Main Engines, the External Tank and associated GSE. The test program consisted of cryogenic tanking tests and short- and long duration static firings including gimbaling and throttling. The test program was conducted on the S1-C test stand (Position B-2) at the National Space Technology Laboratories (NSTL)/Stennis Space Center. 3 tanking tests and 20 hot fire tests conducted between December 21 1 1977 and December 17, 1980 Configuration: The main propulsion test article consisted of the three space shuttle main engines, flightweight external tank, flightweight aft fuselage, interface section and a boilerplate mid/fwd fuselage truss structure.

  16. Seal material development test program

    NASA Technical Reports Server (NTRS)

    1971-01-01

    A program designed to characterize an experimental fluoroelastomer material designated AF-E-124D, is examined. Tests conducted include liquid nitrogen load compression tests, flexure tests and valve seal tests, ambient and elevated temperature compression set tests, and cleaning and flushing fluid exposure tests. The results of these tests indicate the AF-E-124D is a good choice for a cryogenic seal, since it exhibits good low temperature sealing characteristics and resistance to permanent set. The status of this material as an experimental fluorelastomer is stressed and recommended. Activity includes definition and control of critical processing to ensure consistent material properties. Design, fabrication and test of this and other materials is recommended in valve and static seal applications.

  17. Conduct overall test operations and evaluate two Doppler systems to detect, track and measure velocities in aircraft wake vortices

    NASA Technical Reports Server (NTRS)

    Wilson, D. J.; Krause, M. C.; Craven, C. E.; Edwards, B. B.; Coffey, E. W.; Huang, C. C.; Jetton, J. L.; Morrison, L. K.

    1974-01-01

    A program plan for system evaluation of the two-dimensional Scanning Laser Doppler System (SLDS) is presented. In order to meet system evaluation and optimization objectives the following tests were conducted: (1) noise tests; (2) wind tests; (3) blower flowfield tests; (4) single unit (1-D) flyby tests; and (5) dual unit (2-D) flyby tests. Test results are reported. The final phase of the program included logistics preparation, equipment interface checkouts, and data processing. It is concluded that the SLDS is capable of accurately tracking aircraft wake vortices from small or large aircraft, and in any type of weather.

  18. Special report. Drug testing in the workplace: an update.

    PubMed

    1994-10-01

    Workplace drug testing has become widespread in the U.S. and is a major component of the nation's "war on drugs." A recent annual survey by the American Management Association shows that the number of workplace drug-testing programs in surveyed companies grew almost 300% between 1987 and 1993. Nearly 85% of the 630 firms responding to the 1993 survey conduct some form of drug testing. Among activities sparking interest in drug testing are some highly publicized catastrophes in which drugs or alcohol played a major role--for example, the Exxon Valdez oil spill in Alaska which raised concern over threats to public safety. While the popularity of drug testing has increased, programs have been criticized at the same time for being inaccurate, costly, invasive of privacy, and even illegal in certain cases. As alternatives to urinalysis and other tests, companies have introduced impairment tests--also called performance tests and "fitness-for-duty" tests--which are computer-based and measure employees' eye-hand coordination or cognitive skills. Tests also have been introduced to detect drug residues on surfaces. In this report, we'll review some recent studies on drug testing and some of the programs currently being conducted.

  19. UW VLSI chip tester

    NASA Astrophysics Data System (ADS)

    McKenzie, Neil

    1989-12-01

    We present a design for a low-cost, functional VLSI chip tester. It is based on the Apple MacIntosh II personal computer. It tests chips that have up to 128 pins. All pin drivers of the tester are bidirectional; each pin is programmed independently as an input or an output. The tester can test both static and dynamic chips. Rudimentary speed testing is provided. Chips are tested by executing C programs written by the user. A software library is provided for program development. Tests run under both the Mac Operating System and A/UX. The design is implemented using Xilinx Logic Cell Arrays. Price/performance tradeoffs are discussed.

  20. A six-week neuromuscular training program for competitive junior tennis players.

    PubMed

    Barber-Westin, Sue D; Hermeto, Alex A; Noyes, Frank R

    2010-09-01

    This study evaluated the effectiveness of a tennis-specific training program on improving neuromuscular indices in competitive junior players. Tennis is a demanding sport because it requires speed, agility, explosive power, and aerobic conditioning along with the ability to react and anticipate quickly, and there are limited studies that evaluate these indices in young players after a multiweek training program. The program designed for this study implemented the essential components of a previously published neuromuscular training program and also included exercises designed to improve dynamic balance, agility, speed, and strength. Fifteen junior tennis players (10 girls, 5 boys; mean age, 13.0 +/- 1.5 years) who routinely participated in local tournaments and high-school teams participated in the 6-week supervised program. Training was conducted 3 times a week, with sessions lasting 1.5 hours that included a dynamic warm-up, plyometric and jump training, strength training (lower extremity, upper extremity, core), tennis-specific drills, and flexibility. After training, statistically significant improvements and large-to-moderate effect sizes were found in the single-leg triple crossover hop for both legs (p < 0.05), the baseline forehand (p = 0.006) and backhand (p = 0.0008) tests, the service line (p = 0.0009) test, the 1-court suicide (p < 0.0001), the 2-court suicide (p = 0.02), and the abdominal endurance test (p = 0.01). Mean improvements between pretrain and posttrain test sessions were 15% for the single-leg triple crossover hop, 10-11% for the baseline tests, 18% for the service line test, 21% for the 1-court suicide, 10% for the 2-court suicide, and 76% for the abdominal endurance test. No athlete sustained an injury or developed an overuse syndrome as a result of the training program. The results demonstrate that this program is feasible, low in cost, and appears to be effective in improving the majority of neuromuscular indices tested. We accomplished our goal of developing training and testing procedures that could all be performed on the tennis court.

Top