Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-13
... Licensing of Non-Power Reactors: Format and Content,'' for the Production of Radioisotopes and NUREG-1537, part 2, ``Guidelines for Preparing and Reviewing Applications for the Licensing of Non-Power Reactors... production facility and the Research and Test Reactor Licensing Branch (PRLB) of the Division of Policy and...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-17
... test reactor, constructed to perform irradiation testing of fueled and unfueled experiments for space... constructed to test ``mock-up'' irradiation components for the Plum Brook Reactor. The reactors operated from...
Code of Federal Regulations, 2010 CFR
2010-01-01
... holding an operating license for a power reactor, test reactor or research reactor issued under part 50 of... authorizes operation of a power reactor. The regulations in this part also apply to any person holding a...
Implementation Plan for Qualification of Sodium-Cooled Fast Reactor Technology Information
DOE Office of Scientific and Technical Information (OSTI.GOV)
Moe, Wayne; Honma, George
This document identifies and discusses implementation elements that can be used to facilitate consistent and systematic evaluation processes relating to quality attributes of technical information (with focus on SFR technology) that will be used to support licensing of advanced reactor designs. Information may include, but is not limited to, design documents for SFRs, research-and-development (R&D) data and associated documents, test plans and associated protocols, operations and test data, international research data, technical reports, and information associated with past U.S. Nuclear Regulatory Commission (NRC) reviews of SFR designs. The approach for determining acceptability of test data, analysis, and/or other technical informationmore » is based on guidance provided in INL/EXT-15-35805, “Guidance on Evaluating Historic Technology Information for Use in Advanced Reactor Licensing.” The implementation plan can be adopted into a working procedure at each of the national laboratories performing data qualification, or by applicants seeking future license application for advanced reactor technology.« less
Code of Federal Regulations, 2012 CFR
2012-01-01
.... Nuclear Regulatory Commission, Washington, DC 20555-0001. The guidance discusses, among other topics, the.... (b)(1) Except for test and research reactor facilities, the Director, Office of Nuclear Reactor... involving a test and research reactor facility licensed under 10 CFR part 50 and any related inquiry...
Code of Federal Regulations, 2013 CFR
2013-01-01
.... Nuclear Regulatory Commission, Washington, DC 20555-0001. The guidance discusses, among other topics, the.... (b)(1) Except for test and research reactor facilities, the Director, Office of Nuclear Reactor... involving a test and research reactor facility licensed under 10 CFR part 50 and any related inquiry...
10 CFR 52.167 - Issuance of manufacturing license.
Code of Federal Regulations, 2010 CFR
2010-01-01
... proposed reactor(s) can be incorporated into a nuclear power plant and operated at sites having... design and manufacture the proposed nuclear power reactor(s); (5) The proposed inspections, tests... the construction of a nuclear power facility using the manufactured reactor(s). (2) A holder of a...
Code of Federal Regulations, 2011 CFR
2011-01-01
.... Nuclear Regulatory Commission, Washington, DC 20555-0001. The guidance discusses, among other topics, the.... (b)(1) Except for test and research reactor facilities, the Director, Office of Nuclear Reactor... this part involving a test and research reactor facility licensed under 10 CFR part 50 and any related...
78 FR 63516 - Initial Test Program of Emergency Core Cooling Systems for New Boiling-Water Reactors
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-24
... NUCLEAR REGULATORY COMMISSION [NRC-2012-0134] Initial Test Program of Emergency Core Cooling....79.1, ``Initial Test Program of Emergency Core Cooling Systems for New Boiling-Water Reactors.'' This... emergency core cooling systems (ECCSs) for boiling- water reactors (BWRs) whose licenses are issued after...
10 CFR 171.15 - Annual fees: Reactor licenses and independent spent fuel storage licenses.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 2 2011-01-01 2011-01-01 false Annual fees: Reactor licenses and independent spent fuel... REACTOR LICENSES AND FUEL CYCLE LICENSES AND MATERIALS LICENSES, INCLUDING HOLDERS OF CERTIFICATES OF... NRC § 171.15 Annual fees: Reactor licenses and independent spent fuel storage licenses. (a) Each...
10 CFR 171.15 - Annual fees: Reactor licenses and independent spent fuel storage licenses.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Annual fees: Reactor licenses and independent spent fuel... REACTOR LICENSES AND FUEL CYCLE LICENSES AND MATERIALS LICENSES, INCLUDING HOLDERS OF CERTIFICATES OF... NRC § 171.15 Annual fees: Reactor licenses and independent spent fuel storage licenses. (a) Each...
10 CFR 52.98 - Finality of combined licenses; information requests.
Code of Federal Regulations, 2011 CFR
2011-01-01
... condition of the combined license, the design of the facility, the inspections, tests, analyses, and acceptance criteria contained in the license which are not derived from a referenced standard design... chapter, as applicable. (b) If the combined license does not reference a design certification or a reactor...
10 CFR 52.98 - Finality of combined licenses; information requests.
Code of Federal Regulations, 2010 CFR
2010-01-01
... condition of the combined license, the design of the facility, the inspections, tests, analyses, and acceptance criteria contained in the license which are not derived from a referenced standard design... chapter, as applicable. (b) If the combined license does not reference a design certification or a reactor...
10 CFR 52.98 - Finality of combined licenses; information requests.
Code of Federal Regulations, 2012 CFR
2012-01-01
... condition of the combined license, the design of the facility, the inspections, tests, analyses, and acceptance criteria contained in the license which are not derived from a referenced standard design... chapter, as applicable. (b) If the combined license does not reference a design certification or a reactor...
10 CFR 52.98 - Finality of combined licenses; information requests.
Code of Federal Regulations, 2014 CFR
2014-01-01
... condition of the combined license, the design of the facility, the inspections, tests, analyses, and acceptance criteria contained in the license which are not derived from a referenced standard design... chapter, as applicable. (b) If the combined license does not reference a design certification or a reactor...
10 CFR 52.98 - Finality of combined licenses; information requests.
Code of Federal Regulations, 2013 CFR
2013-01-01
... condition of the combined license, the design of the facility, the inspections, tests, analyses, and acceptance criteria contained in the license which are not derived from a referenced standard design... chapter, as applicable. (b) If the combined license does not reference a design certification or a reactor...
75 FR 11375 - Revision of Fee Schedules; Fee Recovery for FY 2010
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-10
... Spent Fuel Storage/Reactor Decommissioning..... 2.7 0.2 0.2 Test and Research Reactors 0.2 0.0 0.0 Fuel... categories of licenses. The FY 2009 fee is also shown for comparative purposes. Table V--Rebaselined Annual...) Spent Fuel Storage/Reactor 122,000 143,000 Decommissioning Test and Research Reactors (Non-power 87,600...
Operators in the Plum Brook Reactor Facility Control Room
1970-03-21
Donald Rhodes, left, and Clyde Greer, right, monitor the operation of the National Aeronautics and Space Administration’s (NASA) Plum Brook Reactor Facility from the control room. The 60-megawatt test reactor, NASA’s only reactor, was the eighth largest test reactor in the world. The facility was built by the Lewis Research Center in the late 1950s to study the effects of radiation on different materials that could be used to construct nuclear propulsion systems for aircraft or rockets. The reactor went critical for the first time in 1961. For the next two years, two operators were on duty 24 hours per day working on the fission process until the reactor reached its full-power level in 1963. Reactor Operators were responsible for monitoring and controlling the reactor systems. Once the reactor was running under normal operating conditions, the work was relatively uneventful. Normally the reactor was kept at a designated power level within certain limits. Occasionally the operators had to increase the power for a certain test. The shift supervisor and several different people would get together and discuss the change before boosting the power. All operators were required to maintain a Reactor Operator License from the Atomic Energy Commission. The license included six months of training, an eight-hour written exam, a four-hour walkaround, and testing on the reactor controls.
5 CFR 5801.102 - Prohibited securities.
Code of Federal Regulations, 2014 CFR
2014-01-01
... licenses for facilities which generate electric energy by means of a nuclear reactor; (2) State or local... reactor or a low-level waste facility; (3) Entities manufacturing or selling nuclear power or test reactors; (4) Architectural-engineering companies providing services relating to a nuclear power reactor...
5 CFR 5801.102 - Prohibited securities.
Code of Federal Regulations, 2010 CFR
2010-01-01
... licenses for facilities which generate electric energy by means of a nuclear reactor; (2) State or local... reactor or a low-level waste facility; (3) Entities manufacturing or selling nuclear power or test reactors; (4) Architectural-engineering companies providing services relating to a nuclear power reactor...
High Temperature Gas-Cooled Test Reactor Point Design: Summary Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sterbentz, James William; Bayless, Paul David; Nelson, Lee Orville
2016-01-01
A point design has been developed for a 200-MW high-temperature gas-cooled test reactor. The point design concept uses standard prismatic blocks and 15.5% enriched uranium oxycarbide fuel. Reactor physics and thermal-hydraulics simulations have been performed to characterize the capabilities of the design. In addition to the technical data, overviews are provided on the technology readiness level, licensing approach, and costs of the test reactor point design.
High Temperature Gas-Cooled Test Reactor Point Design: Summary Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sterbentz, James William; Bayless, Paul David; Nelson, Lee Orville
2016-03-01
A point design has been developed for a 200-MW high-temperature gas-cooled test reactor. The point design concept uses standard prismatic blocks and 15.5% enriched uranium oxycarbide fuel. Reactor physics and thermal-hydraulics simulations have been performed to characterize the capabilities of the design. In addition to the technical data, overviews are provided on the technology readiness level, licensing approach, and costs of the test reactor point design.
ReactorHealth Physics operations at the NIST center for neutron research.
Johnston, Thomas P
2015-02-01
Performing health physics and radiation safety functions under a special nuclear material license and a research and test reactor license at a major government research and development laboratory encompasses many elements not encountered by industrial, general, or broad scope licenses. This article reviews elements of the health physics and radiation safety program at the NIST Center for Neutron Research, including the early history and discovery of the neutron, applications of neutron research, reactor overview, safety and security of radiation sources and radioactive material, and general health physics procedures. These comprise precautions and control of tritium, training program, neutron beam sample processing, laboratory audits, inventory and leak tests, meter calibration, repair and evaluation, radioactive waste management, and emergency response. In addition, the radiation monitoring systems will be reviewed including confinement building monitoring, ventilation filter radiation monitors, secondary coolant monitors, gaseous fission product monitors, gas monitors, ventilation tritium monitor, and the plant effluent monitor systems.
10 CFR 140.11 - Amounts of financial protection for certain reactors.
Code of Federal Regulations, 2014 CFR
2014-01-01
...,000,000 for each nuclear reactor he is authorized to operate at a thermal power level not exceeding ten kilowatts; (2) In the amount of $1,500,000 for each nuclear reactor he is authorized to operate at... amount of $2,500,000 for each nuclear reactor other than a testing reactor or a reactor licensed under...
10 CFR 140.11 - Amounts of financial protection for certain reactors.
Code of Federal Regulations, 2012 CFR
2012-01-01
...,000,000 for each nuclear reactor he is authorized to operate at a thermal power level not exceeding ten kilowatts; (2) In the amount of $1,500,000 for each nuclear reactor he is authorized to operate at... amount of $2,500,000 for each nuclear reactor other than a testing reactor or a reactor licensed under...
10 CFR 140.11 - Amounts of financial protection for certain reactors.
Code of Federal Regulations, 2013 CFR
2013-01-01
...,000,000 for each nuclear reactor he is authorized to operate at a thermal power level not exceeding ten kilowatts; (2) In the amount of $1,500,000 for each nuclear reactor he is authorized to operate at... amount of $2,500,000 for each nuclear reactor other than a testing reactor or a reactor licensed under...
77 FR 69663 - Agency Information Collection Activities: Proposed Collection; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-20
... required or asked to report: Holders of and applicants for facility (i.e., nuclear power, non-power research and test reactor) operating licenses and individual operators; licenses. 5. The number of annual...
10 CFR 72.210 - General license issued.
Code of Federal Regulations, 2010 CFR
2010-01-01
... NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C WASTE General License for Storage of Spent Fuel at Power Reactor Sites § 72.210 General license issued. A general license is... reactor sites to persons authorized to possess or operate nuclear power reactors under 10 CFR part 50 or...
10 CFR 72.210 - General license issued.
Code of Federal Regulations, 2011 CFR
2011-01-01
... NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C WASTE General License for Storage of Spent Fuel at Power Reactor Sites § 72.210 General license issued. A general license is... reactor sites to persons authorized to possess or operate nuclear power reactors under 10 CFR part 50 or...
High-Temperature Gas-Cooled Test Reactor Point Design
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sterbentz, James William; Bayless, Paul David; Nelson, Lee Orville
2016-04-01
A point design has been developed for a 200 MW high-temperature gas-cooled test reactor. The point design concept uses standard prismatic blocks and 15.5% enriched UCO fuel. Reactor physics and thermal-hydraulics simulations have been performed to characterize the capabilities of the design. In addition to the technical data, overviews are provided on the technological readiness level, licensing approach and costs.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-14
...., Aerotest Radiography and Research Reactor; Notice of Consideration of Approval of Transfer and Conforming Amendment, Opportunity for a Hearing, and Order Imposing Procedures for Access to Sensitive Unclassified Non... Manager, Research and Test Reactors Licensing Branch, Division of Policy and Rulemaking, Office of Nuclear...
10 CFR 50.30 - Filing of application; oath or affirmation.
Code of Federal Regulations, 2012 CFR
2012-01-01
... Reactor Regulation, Director, Office of New Reactors, or Director, Office of Nuclear Material Safety and... Director, Office of New Reactors, or the Director, Office of Nuclear Reactor Regulation, or the Director..., operating license, early site permit, combined license, or manufacturing license for a nuclear power reactor...
10 CFR 50.30 - Filing of application; oath or affirmation.
Code of Federal Regulations, 2011 CFR
2011-01-01
... Reactor Regulation, Director, Office of New Reactors, or Director, Office of Nuclear Material Safety and... Director, Office of New Reactors, or the Director, Office of Nuclear Reactor Regulation, or the Director..., operating license, early site permit, combined license, or manufacturing license for a nuclear power reactor...
10 CFR 50.30 - Filing of application; oath or affirmation.
Code of Federal Regulations, 2014 CFR
2014-01-01
... Reactor Regulation, Director, Office of New Reactors, or Director, Office of Nuclear Material Safety and... Director, Office of New Reactors, or the Director, Office of Nuclear Reactor Regulation, or the Director..., operating license, early site permit, combined license, or manufacturing license for a nuclear power reactor...
10 CFR 50.30 - Filing of application; oath or affirmation.
Code of Federal Regulations, 2013 CFR
2013-01-01
... Reactor Regulation, Director, Office of New Reactors, or Director, Office of Nuclear Material Safety and... Director, Office of New Reactors, or the Director, Office of Nuclear Reactor Regulation, or the Director..., operating license, early site permit, combined license, or manufacturing license for a nuclear power reactor...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-10
... Regulatory Commission. Jessie F. Quichocho, Chief, Research and Test Reactors Licensing Branch, Division of... information in comment submissions that you do not want to be publicly disclosed. The NRC posts all comment...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kasten, P.R.; Rittenhouse, P.L.; Bartine, D.E.
1983-06-01
During 1982 the High-Temperature Gas-Cooled Reactor (HTGR) Technology Program at Oak Ridge National Laboratory (ORNL) continued to develop experimental data required for the design and licensing of cogeneration HTGRs. The program involves fuels and materials development (including metals, graphite, ceramic, and concrete materials), HTGR chemistry studies, structural component development and testing, reactor physics and shielding studies, performance testing of the reactor core support structure, and HTGR application and evaluation studies.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-08
... Research Reactor; License Renewal for the Dow Chemical TRIGA Research Reactor; Supplemental Information and... 20, 2012 (77 FR 42771), ``License Renewal for the Dow Chemical TRIGA Research Reactor,'' to inform... Chemical Company which would authorize continued operation of the Dow TRIGA Research Reactor. The notice...
77 FR 60039 - Non-Power Reactor License Renewal
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-02
... NUCLEAR REGULATORY COMMISSION 10 CFR Part 50 [NRC-2011-0087] RIN 3150-AI96 Non-Power Reactor... the final regulatory basis for rulemaking to streamline non-power reactor license renewal. This final... Reactor (RTR) License Renewal Process. This contemplated rulemaking also recommends conforming changes to...
Reduced enrichment for research and test reactors: Proceedings
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-07-01
The 15th annual Reduced Enrichment for Research and Test Reactors (RERTR) international meeting was organized by Ris{o} National Laboratory in cooperation with the International Atomic Energy Agency and Argonne National Laboratory. The topics of the meeting were the following: National Programs, Fuel Fabrication, Licensing Aspects, States of Conversion, Fuel Testing, and Fuel Cycle. Individual papers have been cataloged separately.
10 CFR 110.26 - General license for the export of nuclear reactor components.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 2 2014-01-01 2014-01-01 false General license for the export of nuclear reactor components. 110.26 Section 110.26 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) EXPORT AND IMPORT OF NUCLEAR EQUIPMENT AND MATERIAL Licenses § 110.26 General license for the export of nuclear reactor...
10 CFR 110.26 - General license for the export of nuclear reactor components.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false General license for the export of nuclear reactor components. 110.26 Section 110.26 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) EXPORT AND IMPORT OF NUCLEAR EQUIPMENT AND MATERIAL Licenses § 110.26 General license for the export of nuclear reactor...
10 CFR 110.26 - General license for the export of nuclear reactor components.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 2 2013-01-01 2013-01-01 false General license for the export of nuclear reactor components. 110.26 Section 110.26 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) EXPORT AND IMPORT OF NUCLEAR EQUIPMENT AND MATERIAL Licenses § 110.26 General license for the export of nuclear reactor...
10 CFR 110.26 - General license for the export of nuclear reactor components.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 2 2011-01-01 2011-01-01 false General license for the export of nuclear reactor components. 110.26 Section 110.26 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) EXPORT AND IMPORT OF NUCLEAR EQUIPMENT AND MATERIAL Licenses § 110.26 General license for the export of nuclear reactor...
10 CFR 110.26 - General license for the export of nuclear reactor components.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 2 2012-01-01 2012-01-01 false General license for the export of nuclear reactor components. 110.26 Section 110.26 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) EXPORT AND IMPORT OF NUCLEAR EQUIPMENT AND MATERIAL Licenses § 110.26 General license for the export of nuclear reactor...
10 CFR 110.42 - Export licensing criteria.
Code of Federal Regulations, 2012 CFR
2012-01-01
... research on or development of any nuclear explosive device. (3) Adequate physical security measures will be... to exports of high-enriched uranium to be used as a fuel or target in a nuclear research or test... can be used in the reactor. (iii) A fuel or target “can be used” in a nuclear research or test reactor...
10 CFR 50.72 - Immediate notification requirements for operating nuclear power reactors.
Code of Federal Regulations, 2010 CFR
2010-01-01
... power reactors. 50.72 Section 50.72 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF... notification requirements for operating nuclear power reactors. (a) General requirements. 1 (1) Each nuclear power reactor licensee licensed under §§ 50.21(b) or 50.22 holding an operating license under this part...
10 CFR 50.72 - Immediate notification requirements for operating nuclear power reactors.
Code of Federal Regulations, 2011 CFR
2011-01-01
... power reactors. 50.72 Section 50.72 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF... notification requirements for operating nuclear power reactors. (a) General requirements. 1 (1) Each nuclear power reactor licensee licensed under §§ 50.21(b) or 50.22 holding an operating license under this part...
Code of Federal Regulations, 2010 CFR
2010-01-01
... the issuance of a combined license for a nuclear power reactor under part 52 of this chapter, the... or Director, Office of Nuclear Reactor Regulation, as appropriate. (b) If a combined license... authorization should be issued as proposed by the Director of New Reactors or the Director of Nuclear Reactor...
Code of Federal Regulations, 2012 CFR
2012-01-01
... the issuance of a combined license for a nuclear power reactor under part 52 of this chapter, the... or Director, Office of Nuclear Reactor Regulation, as appropriate. (b) If a combined license... authorization should be issued as proposed by the Director of New Reactors or the Director of Nuclear Reactor...
Code of Federal Regulations, 2014 CFR
2014-01-01
... the issuance of a combined license for a nuclear power reactor under part 52 of this chapter, the... or Director, Office of Nuclear Reactor Regulation, as appropriate. (b) If a combined license... authorization should be issued as proposed by the Director of New Reactors or the Director of Nuclear Reactor...
10 CFR 140.94 - Appendix D-Form of indemnity agreement with Federal agencies.
Code of Federal Regulations, 2011 CFR
2011-01-01
... (hereinafter referred to as the Act). Article I As used in this agreement, 1. Nuclear reactor, byproduct... irradiated or to be irradiated by, the nuclear reactor or reactors subject to the license or licenses... construction of a nuclear reactor with respect to which no operating license has been issued by the Nuclear...
Code of Federal Regulations, 2011 CFR
2011-01-01
... the issuance of a combined license for a nuclear power reactor under part 52 of this chapter, the... or Director, Office of Nuclear Reactor Regulation, as appropriate. (b) If a combined license... authorization should be issued as proposed by the Director of New Reactors or the Director of Nuclear Reactor...
Code of Federal Regulations, 2013 CFR
2013-01-01
... the issuance of a combined license for a nuclear power reactor under part 52 of this chapter, the... or Director, Office of Nuclear Reactor Regulation, as appropriate. (b) If a combined license... authorization should be issued as proposed by the Director of New Reactors or the Director of Nuclear Reactor...
Next generation fuel irradiation capability in the High Flux Reactor Petten
NASA Astrophysics Data System (ADS)
Fütterer, Michael A.; D'Agata, Elio; Laurie, Mathias; Marmier, Alain; Scaffidi-Argentina, Francesco; Raison, Philippe; Bakker, Klaas; de Groot, Sander; Klaassen, Frodo
2009-07-01
This paper describes selected equipment and expertise on fuel irradiation testing at the High Flux Reactor (HFR) in Petten, The Netherlands. The reactor went critical in 1961 and holds an operating license up to at least 2015. While HFR has initially focused on Light Water Reactor fuel and materials, it also played a decisive role since the 1970s in the German High Temperature Reactor (HTR) development program. A variety of tests related to fast reactor development in Europe were carried out for next generation fuel and materials, in particular for Very High Temperature Reactor (V/HTR) fuel, fuel for closed fuel cycles (U-Pu and Th-U fuel cycle) and transmutation, as well as for other innovative fuel types. The HFR constitutes a significant European infrastructure tool for the development of next generation reactors. Experimental facilities addressed include V/HTR fuel tests, a coated particle irradiation rig, and tests on fast reactor, transmutation and thorium fuel. The rationales for these tests are given, results are provided and further work is outlined.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Honma, George
The establishment of a systematic process for the evaluation of historic technology information for use in advanced reactor licensing is described. Efforts are underway to recover and preserve Experimental Breeder Reactor II and Fast Flux Test Facility historical data. These efforts have generally emphasized preserving information from data-acquisition systems and hard-copy reports and entering it into modern electronic formats suitable for data retrieval and examination. The guidance contained in this document has been developed to facilitate consistent and systematic evaluation processes relating to quality attributes of historic technical information (with focus on sodium-cooled fast reactor (SFR) technology) that will bemore » used to eventually support licensing of advanced reactor designs. The historical information may include, but is not limited to, design documents for SFRs, research-and-development (R&D) data and associated documents, test plans and associated protocols, operations and test data, international research data, technical reports, and information associated with past U.S. Nuclear Regulatory Commission (NRC) reviews of SFR designs. The evaluation process is prescribed in terms of SFR technology, but the process can be used to evaluate historical information for any type of advanced reactor technology. An appendix provides a discussion of typical issues that should be considered when evaluating and qualifying historical information for advanced reactor technology fuel and source terms, based on current light water reactor (LWR) requirements and recent experience gained from Next Generation Nuclear Plant (NGNP).« less
10 CFR 72.6 - License required; types of licenses.
Code of Federal Regulations, 2011 CFR
2011-01-01
... SPENT NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C WASTE General... the receipt, handling, storage, and transfer of reactor-related GTCC are specific licenses. Any... hereby issued to receive title to and own spent fuel, high-level radioactive waste, or reactor-related...
10 CFR 72.6 - License required; types of licenses.
Code of Federal Regulations, 2010 CFR
2010-01-01
... SPENT NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C WASTE General... the receipt, handling, storage, and transfer of reactor-related GTCC are specific licenses. Any... hereby issued to receive title to and own spent fuel, high-level radioactive waste, or reactor-related...
10 CFR 72.218 - Termination of licenses.
Code of Federal Regulations, 2011 CFR
2011-01-01
... NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C WASTE General License for Storage of Spent Fuel at Power Reactor Sites § 72.218 Termination of licenses. (a) The notification regarding the program for the management of spent fuel at the reactor required by § 50.54(bb) of...
10 CFR 72.218 - Termination of licenses.
Code of Federal Regulations, 2010 CFR
2010-01-01
... NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C WASTE General License for Storage of Spent Fuel at Power Reactor Sites § 72.218 Termination of licenses. (a) The notification regarding the program for the management of spent fuel at the reactor required by § 50.54(bb) of...
78 FR 73898 - Operator Licensing Examination Standards for Power Reactors
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-09
... Reactors AGENCY: Nuclear Regulatory Commission. ACTION: Draft NUREG; request for comment. SUMMARY: The U.S..., Revision 10, ``Operator Licensing Examination Standards for Power Reactors.'' DATES: Submit comments [email protected] . Both of the Office of New Reactors; or Timothy Kolb, Office of Nuclear Reactor Regulation, U...
Advanced Reactor Technologies - Regulatory Technology Development Plan (RTDP)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Moe, Wayne L.
This DOE-NE Advanced Small Modular Reactor (AdvSMR) regulatory technology development plan (RTDP) will link critical DOE nuclear reactor technology development programs to important regulatory and policy-related issues likely to impact a “critical path” for establishing a viable commercial AdvSMR presence in the domestic energy market. Accordingly, the regulatory considerations that are set forth in the AdvSMR RTDP will not be limited to any one particular type or subset of advanced reactor technology(s) but rather broadly consider potential regulatory approaches and the licensing implications that accompany all DOE-sponsored research and technology development activity that deal with commercial non-light water reactors. However,more » it is also important to remember that certain “minimum” levels of design and safety approach knowledge concerning these technology(s) must be defined and available to an extent that supports appropriate pre-licensing regulatory analysis within the RTDP. Final resolution to advanced reactor licensing issues is most often predicated on the detailed design information and specific safety approach as documented in a facility license application and submitted for licensing review. Because the AdvSMR RTDP is focused on identifying and assessing the potential regulatory implications of DOE-sponsored reactor technology research very early in the pre-license application development phase, the information necessary to support a comprehensive regulatory analysis of a new reactor technology, and the resolution of resulting issues, will generally not be available. As such, the regulatory considerations documented in the RTDP should be considered an initial “first step” in the licensing process which will continue until a license is issued to build and operate the said nuclear facility. Because a facility license application relies heavily on the data and information generated by technology development studies, the anticipated regulatory importance of key DOE reactor research initiatives should be assessed early in the technology development process. Quality assurance requirements supportive of later licensing activities must also be attached to important research activities to ensure resulting data is usable in that context. Early regulatory analysis and licensing approach planning thus provides a significant benefit to the formulation of research plans and also enables the planning and development of a compatible AdvSMR licensing framework, should significant modification be required.« less
Advanced Reactor Technology -- Regulatory Technology Development Plan (RTDP)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Moe, Wayne Leland
This DOE-NE Advanced Small Modular Reactor (AdvSMR) regulatory technology development plan (RTDP) will link critical DOE nuclear reactor technology development programs to important regulatory and policy-related issues likely to impact a “critical path” for establishing a viable commercial AdvSMR presence in the domestic energy market. Accordingly, the regulatory considerations that are set forth in the AdvSMR RTDP will not be limited to any one particular type or subset of advanced reactor technology(s) but rather broadly consider potential regulatory approaches and the licensing implications that accompany all DOE-sponsored research and technology development activity that deal with commercial non-light water reactors. However,more » it is also important to remember that certain “minimum” levels of design and safety approach knowledge concerning these technology(s) must be defined and available to an extent that supports appropriate pre-licensing regulatory analysis within the RTDP. Final resolution to advanced reactor licensing issues is most often predicated on the detailed design information and specific safety approach as documented in a facility license application and submitted for licensing review. Because the AdvSMR RTDP is focused on identifying and assessing the potential regulatory implications of DOE-sponsored reactor technology research very early in the pre-license application development phase, the information necessary to support a comprehensive regulatory analysis of a new reactor technology, and the resolution of resulting issues, will generally not be available. As such, the regulatory considerations documented in the RTDP should be considered an initial “first step” in the licensing process which will continue until a license is issued to build and operate the said nuclear facility. Because a facility license application relies heavily on the data and information generated by technology development studies, the anticipated regulatory importance of key DOE reactor research initiatives should be assessed early in the technology development process. Quality assurance requirements supportive of later licensing activities must also be attached to important research activities to ensure resulting data is usable in that context. Early regulatory analysis and licensing approach planning thus provides a significant benefit to the formulation of research plans and also enables the planning and development of a compatible AdvSMR licensing framework, should significant modification be required.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-03
... Nuclear Reactor, Renewed Facility Operating License No. R-112 AGENCY: Nuclear Regulatory Commission... Commission (NRC or the Commission) has issued renewed Facility Operating License No. R- 112, held by Reed... License No. R-112 will expire 20 years from its date of issuance. The renewed facility operating license...
75 FR 4493 - Natural Resources Defense Council; Denial of Petition for Rulemaking
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-28
... NRC continues to license the civilian use of HEU to fuel seven existing research and test reactors... predicts that the three HEU-fueled TRIGA-type research reactors at Oregon State University, the University...) is scheduled for conversion to LEU but notes that the newer and larger LEU-fueled TRIGA facility at...
76 FR 16842 - Request for a License To Export Reactor Components
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-25
... NUCLEAR REGULATORY COMMISSION Request for a License To Export Reactor Components Pursuant to 10.... Mechanical Corporation. coolant pump 1000 (design) maintenance, and systems, related reactors. operation of AP- equipment, and 1000 (design) spare parts. nuclear reactors. February 10, 2011 February 23, 2011...
77 FR 38742 - Non-Power Reactor License Renewal
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-29
...-0087] RIN 3150-AI96 Non-Power Reactor License Renewal AGENCY: Nuclear Regulatory Commission. ACTION... reactors. This contemplated rulemaking would also make conforming changes to address technical issues in existing non-power reactor regulations. The NRC is seeking input from the public, licensees, certificate...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-28
... University of Illinois Advanced TRIGA Reactor, License No. R-115 The U.S. Nuclear Regulatory Commission (NRC) is noticing the termination of Facility Operating License No. R-115, for the University of Illinois... Operating License No. R-115 is terminated. The above referenced documents may be examined, and/or copied for...
Code of Federal Regulations, 2011 CFR
2011-01-01
... Licenses To Construct and Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... Designs: Combined Licenses To Construct and Operate Nuclear Power Reactors of Identical Design at Multiple... construct and operate nuclear power reactors of identical design (“common design”) to be located at multiple...
76 FR 68514 - Request for a License To Export Reactor Components
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-04
... NUCLEAR REGULATORY COMMISSION Request for a License To Export Reactor Components Pursuant to 10.../docket Number Westinghouse Electric Company Complete reactor 12 Perform seismic China. LLC, August 18... qualification equipment. of AP1000 (design) nuclear reactors. For the Nuclear Regulatory Commission. Dated this...
10 CFR 50.72 - Immediate notification requirements for operating nuclear power reactors.
Code of Federal Regulations, 2014 CFR
2014-01-01
... power reactors. 50.72 Section 50.72 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF... notification requirements for operating nuclear power reactors. (a) General requirements. 1 (1) Each nuclear... requirements for immediate notification of the NRC by licensed operating nuclear power reactors are contained...
10 CFR 50.36 - Technical specifications.
Code of Federal Regulations, 2013 CFR
2013-01-01
... nuclear reactors are limits upon important process variables that are found to be necessary to reasonably... Commission terminates the license for the reactor, except for nuclear power reactors licensed under § 50.21(b... for nuclear reactors are settings for automatic protective devices related to those variables having...
10 CFR 50.36 - Technical specifications.
Code of Federal Regulations, 2014 CFR
2014-01-01
... nuclear reactors are limits upon important process variables that are found to be necessary to reasonably... Commission terminates the license for the reactor, except for nuclear power reactors licensed under § 50.21(b... for nuclear reactors are settings for automatic protective devices related to those variables having...
10 CFR 50.36 - Technical specifications.
Code of Federal Regulations, 2012 CFR
2012-01-01
... nuclear reactors are limits upon important process variables that are found to be necessary to reasonably... Commission terminates the license for the reactor, except for nuclear power reactors licensed under § 50.21(b... for nuclear reactors are settings for automatic protective devices related to those variables having...
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Illustrative List of Nuclear Reactor Equipment Under NRC... List of Nuclear Reactor Equipment Under NRC Export Licensing Authority Note—A nuclear reactor basically includes the items within or attached directly to the reactor vessel, the equipment which controls the...
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 2 2011-01-01 2011-01-01 false Illustrative List of Nuclear Reactor Equipment Under NRC... List of Nuclear Reactor Equipment Under NRC Export Licensing Authority Note—A nuclear reactor basically includes the items within or attached directly to the reactor vessel, the equipment which controls the...
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 2 2014-01-01 2014-01-01 false Illustrative List of Nuclear Reactor Equipment Under NRC... List of Nuclear Reactor Equipment Under NRC Export Licensing Authority Note: A nuclear reactor... core of a nuclear reactor and capable of withstanding the operating pressure of the primary coolant. (2...
78 FR 57904 - Request for a License To Export; Reactor Components
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-20
... NUCLEAR REGULATORY COMMISSION Request for a License To Export; Reactor Components Pursuant to 10..., systems, related reactors. operation of AP- XR177, 11006121. equipment, and 1000 (design) spare parts. nuclear reactors. Dated this 16th day of September 2013 in Rockville, Maryland. For The Nuclear Regulatory...
10 CFR 2.1115 - Designation of issues for adjudicatory hearing.
Code of Federal Regulations, 2010 CFR
2010-01-01
... at Civilian Nuclear Power Reactors § 2.1115 Designation of issues for adjudicatory hearing. (a) After... reactor already licensed to operate at the site, or any civilian nuclear power reactor for which a... the issuance of a construction permit or operating license for a civilian nuclear power reactor at...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-16
... NUCLEAR REGULATORY COMMISSION [Docket Nos (Redacted), License Nos (Redacted), EA (Redacted); NRC- 2010-0351] In the Matter of All Power Reactor Licensees and Research Reactor Licensees Who Transport Spent Nuclear Fuel; Order Modifying License (Effective Immediately) I. The licensees identified in...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-20
... NUCLEAR REGULATORY COMMISSION [Docket Nos. (Redacted), License Nos.: (Redacted), EA (Redacted); NRC- 2010-0351] In the Matter of All Power Reactor Licensees and Research Reactor Licensees Who Transport Spent Nuclear Fuel; Order Modifying License (Effective Immediately) I The licensees identified in...
Code of Federal Regulations, 2011 CFR
2011-01-01
... part 52 for a license to manufacture nuclear power reactors. 2.501 Section 2.501 Energy NUCLEAR... Procedures Applicable to Proceedings for the Issuance of Licenses To Manufacture Nuclear Power Reactors To Be... power reactors. (a) In the case of an application under subpart F of part 52 of this chapter for a...
Code of Federal Regulations, 2010 CFR
2010-01-01
... part 52 for a license to manufacture nuclear power reactors. 2.501 Section 2.501 Energy NUCLEAR... Procedures Applicable to Proceedings for the Issuance of Licenses To Manufacture Nuclear Power Reactors To Be... power reactors. (a) In the case of an application under subpart F of part 52 of this chapter for a...
Code of Federal Regulations, 2011 CFR
2011-01-01
... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites Section 101... nuclear power reactors of essentially the same design to be located at different sites. 1 1 If the design...
Code of Federal Regulations, 2012 CFR
2012-01-01
... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites Section 101... nuclear power reactors of essentially the same design to be located at different sites. 1 1 If the design...
Code of Federal Regulations, 2013 CFR
2013-01-01
... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites Section 101... nuclear power reactors of essentially the same design to be located at different sites. 1 1 If the design...
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 2 2012-01-01 2012-01-01 false Illustrative List of Nuclear Reactor Equipment Under NRC... List of Nuclear Reactor Equipment Under NRC Export Licensing Authority Note—A nuclear reactor basically... nuclear reactor and capable of withstanding the operating pressure of the primary coolant. (2) On-line (e...
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 2 2013-01-01 2013-01-01 false Illustrative List of Nuclear Reactor Equipment Under NRC... List of Nuclear Reactor Equipment Under NRC Export Licensing Authority Note—A nuclear reactor basically... nuclear reactor and capable of withstanding the operating pressure of the primary coolant. (2) On-line (e...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Konzek, G.J.
1983-07-01
Additional analyses of decommissioning at the reference research and test (R and T) reactors and analyses of five recent reactor decommissionings are made that examine some parameters not covered in the initial study report (NUREG/CR-1756). The parameters examined for decommissioning are: (1) the effect on costs and radiation exposure of plant size and/or type; (2) the effects on costs of increasing disposal charges and of unavailability of waste disposal capacity at licensed waste disposal facilities; and (3) the costs of and the available alternatives for the disposal of nuclear R and T reactor fuel assemblies.
Function of university reactors in operator licensing training for nuclear utilities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wicks, F.
1985-11-01
The director of the Division of the US Nuclear Regulatory Commission in generic letter 84-10, dated April 26, 1984, spoke the requirement that applicants for senior reactor operator licenses for power reactors shall have performed then reactor startups. Simulator startups were not acknowledged. Startups performed on a university reactor are acceptable. The content and results of a five-day program combining instruction and experiments with the Rensselaer reactor are summarized.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-01
... Energy Carolinas, LLC; William States Lee III Combined License Application; Notice of Intent To Conduct a... environmental review of the William States Lee III Nuclear Station, Units 1 and 2 combined licenses application...-licensing/col/lee.html '' to `` http://www.nrc.gov/reactors/new-reactors/col/lee.html ''. Dated at Rockville...
10 CFR 52.171 - Finality of manufacturing licenses; information requests.
Code of Federal Regulations, 2010 CFR
2010-01-01
... required for issuance of a construction permit, operating license, combined license, in any hearing under... manufactured reactor, the costs and benefits of severe accident mitigation design alternatives, and the bases for not incorporating severe accident mitigation design alternatives into the design of the reactor to...
10 CFR 55.40 - Implementation.
Code of Federal Regulations, 2010 CFR
2010-01-01
... REGULATORY COMMISSION (CONTINUED) OPERATORS' LICENSES Written Examinations and Operating Tests § 55.40... Standards for Power Reactors,” 1 in effect six months before the examination date to prepare the written... also use the criteria in NUREG-1021 to evaluate the written examinations and operating tests prepared...
10 CFR 55.40 - Implementation.
Code of Federal Regulations, 2013 CFR
2013-01-01
... REGULATORY COMMISSION (CONTINUED) OPERATORS' LICENSES Written Examinations and Operating Tests § 55.40... Standards for Power Reactors,” 1 in effect six months before the examination date to prepare the written... also use the criteria in NUREG-1021 to evaluate the written examinations and operating tests prepared...
10 CFR 55.40 - Implementation.
Code of Federal Regulations, 2012 CFR
2012-01-01
... REGULATORY COMMISSION (CONTINUED) OPERATORS' LICENSES Written Examinations and Operating Tests § 55.40... Standards for Power Reactors,” 1 in effect six months before the examination date to prepare the written... also use the criteria in NUREG-1021 to evaluate the written examinations and operating tests prepared...
10 CFR 55.40 - Implementation.
Code of Federal Regulations, 2011 CFR
2011-01-01
... REGULATORY COMMISSION (CONTINUED) OPERATORS' LICENSES Written Examinations and Operating Tests § 55.40... Standards for Power Reactors,” 1 in effect six months before the examination date to prepare the written... also use the criteria in NUREG-1021 to evaluate the written examinations and operating tests prepared...
10 CFR 55.40 - Implementation.
Code of Federal Regulations, 2014 CFR
2014-01-01
... REGULATORY COMMISSION (CONTINUED) OPERATORS' LICENSES Written Examinations and Operating Tests § 55.40... Standards for Power Reactors,” 1 in effect six months before the examination date to prepare the written... also use the criteria in NUREG-1021 to evaluate the written examinations and operating tests prepared...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-13
... NUCLEAR REGULATORY COMMISSION [Docket No. 50-264; NRC-2012-0026] Dow Chemical Company; Dow Chemical TRIGA Research Reactor; Facility Operating License No. R-108 AGENCY: Nuclear Regulatory Commission... Facility Operating License No. R-108 (``Application''), which currently authorizes the Dow Chemical Company...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-16
... Emergency Preparedness AGENCY: Nuclear Regulatory Commission. ACTION: Notice of public meeting. SUMMARY: The... non-power reactor license renewal and non-power reactor emergency preparedness. This meeting is a... potential enhancements to emergency preparedness requirements. This meeting is open to the public. DATES...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-20
... Applications for Instrumentation and Control Upgrades for Non-Power Reactors AGENCY: Nuclear Regulatory...-Power Reactors: Format and Content,'' for instrumentation and control upgrades and NUREG-1537, Part 2, ``Guidelines for Preparing and Reviewing Applications for the Licensing of Non-Power Reactors: Standard Review...
77 FR 39521 - Application for a License To Export Nuclear Reactor Major Components and Equipment
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-03
... LLC reactor coolant equipment for four constructing four plant May 14, 2012 pumps with motors, APR1400... Emirates. XR176 monitoring and plant in Braka. 110060011 control equipment, auxiliary equipment and... NUCLEAR REGULATORY COMMISSION Application for a License To Export Nuclear Reactor Major Components...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-15
... INFORMATION CONTACT: Michael Mahoney, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission... Licensing Branch III-2, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation. [FR... NUCLEAR REGULATORY COMMISSION [Docket No. 50-346] FirstEnergy Nuclear Operating Company; Notice of...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Belles, Randy; Flanagan, George F.; Voth, Marcus
Development of non-power molten salt reactor (MSR) test facilities is under consideration to support the analyses needed for development of a full-scale MSR. These non-power MSR test facilities will require review by the US Nuclear Regulatory Commission (NRC) staff. This report proposes chapter adaptations for NUREG-1537 in the form of interim staff guidance to address preparation and review of molten salt non-power reactor license applications. The proposed adaptations are based on a previous regulatory gap analysis of select chapters from NUREG-1537 for their applicability to non-power MSRs operating with a homogeneous fuel salt mixture.
76 FR 28244 - Agency Information Collection Activities: Proposed Collection; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-16
... occur. 4. Who is required or asked to report: Nuclear power reactor licensees, licensed under 10 CFR..., special nuclear material; Category I fuel facilities; Category II and III facilities; research and test...
Code of Federal Regulations, 2011 CFR
2011-01-01
..., HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C WASTE General License for Storage of Spent Fuel at Power Reactor Sites § 72.220 Violations. This general license is subject to the...
Code of Federal Regulations, 2010 CFR
2010-01-01
..., HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C WASTE General License for Storage of Spent Fuel at Power Reactor Sites § 72.220 Violations. This general license is subject to the...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-24
... NUCLEAR REGULATORY COMMISSION [NRC-2010-0228] Office of New Reactors; Proposed Revision to Standard Review Plan Section 13.6.1, Revision 1 on Physical Security--Combined License and Operating...), Section 13.6.1 on ``Physical Security--Combined License and Operating Reactors,'' (Agencywide Documents...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-06
... Increase the Maximum Reactor Power Level, Florida Power & Light Company, St. Lucie, Units 1 and 2 AGENCY... amendment for Renewed Facility Operating License Nos. DPR-67 and NPF-16, issued to Florida Power & Light... St. Lucie County, Florida. The proposed license amendment would increase the maximum thermal power...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Michael Tyacke; Frantisek Svitak; Jiri Rychecky
2010-04-01
The United States, the Russian Federation, and the International Atomic Energy Agency (IAEA) have been working together on a program called the Russian Research Reactor Fuel Return (RRRFR) Program. The purpose of this program is to return Soviet or Russian supplied high-enriched uranium (HEU) fuel currently stored at Russian-designed research reactors throughout the world to Russia. To accommodate transport of the HEU spent nuclear fuel (SNF), a new large-capacity transport/storage cask system was specially designed for handling and operations under the unique conditions for these research reactor facilities. This new cask system is named the ŠKODA VPVR/M cask. The design,more » licensing, testing, and delivery of this new cask system are the results of a significant international cooperative effort by several countries and involved numerous private and governmental organizations. This paper contains the following sections: (1) Introduction/Background; (2) VPVR/M Cask Description; (3) Ancillary Equipment, (4) Cask Licensing; (5) Cask Demonstration and Operations; (6) IAEA Procurement, Quality Assurance Inspections, Fabrication, and Delivery; and, (7) Summary and Conclusions.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Michael J. Tyacke; Frantisek Svitak; Jiri Rychecky
2007-10-01
The United States, the Russian Federation, and the International Atomic Energy Agency (IAEA) have been working together on a program called the Russian Research Reactor Fuel Return (RRRFR) Program. The purpose of this program is to return Soviet or Russian-supplied high-enriched uranium (HEU) fuel, currently stored at Russian-designed research reactors throughout the world, to Russia. To accommodate transport of the HEU spent nuclear fuel (SNF), a new large-capacity transport/storage cask system was specially designed for handling and operations under the unique conditions at these research reactor facilities. This new cask system is named the ŠKODA VPVR/M cask. The design, licensing,more » testing, and delivery of this new cask system result from a significant international cooperative effort by several countries and involved numerous private and governmental organizations. This paper contains the following sections: 1) Introduction; 2) VPVR/M Cask Description; 3) Ancillary Equipment, 4) Cask Licensing; 5) Cask Demonstration and Operations; 6) IAEA Procurement, Quality Assurance Inspections, Fabrication, and Delivery; and, 7) Conclusions.« less
Code of Federal Regulations, 2010 CFR
2010-01-01
... significance, special nuclear material of low strategic significance, and irradiated reactor fuel. 70.20b..., special nuclear material of low strategic significance, and irradiated reactor fuel. (a) A general license... requirements of § 73.67 of this chapter. (3) Irradiated reactor fuel of the type and quantity subject to the...
Code of Federal Regulations, 2011 CFR
2011-01-01
... significance, special nuclear material of low strategic significance, and irradiated reactor fuel. 70.20b..., special nuclear material of low strategic significance, and irradiated reactor fuel. (a) A general license... requirements of § 73.67 of this chapter. (3) Irradiated reactor fuel of the type and quantity subject to the...
Code of Federal Regulations, 2013 CFR
2013-01-01
... operating licenses for nuclear power reactors, if the Commission has not found that a hearing is in the public interest, the Commission, the Director, Office of New Reactors or Director, Office of Nuclear... licenses pursuant to appendix N of 10 CFR part 50. 2.403 Section 2.403 Energy NUCLEAR REGULATORY COMMISSION...
Code of Federal Regulations, 2012 CFR
2012-01-01
... this chapter for operating licenses for nuclear power reactors, if the Commission has not found that a..., Office of Nuclear Reactor Regulation, as appropriate will, prior to acting thereon, cause to be published... licenses pursuant to appendix N of 10 CFR part 50. 2.403 Section 2.403 Energy NUCLEAR REGULATORY COMMISSION...
Code of Federal Regulations, 2010 CFR
2010-01-01
... this chapter for operating licenses for nuclear power reactors, if the Commission has not found that a..., Office of Nuclear Reactor Regulation, as appropriate will, prior to acting thereon, cause to be published... licenses pursuant to appendix N of 10 CFR part 50. 2.403 Section 2.403 Energy NUCLEAR REGULATORY COMMISSION...
Code of Federal Regulations, 2014 CFR
2014-01-01
... operating licenses for nuclear power reactors, if the Commission has not found that a hearing is in the public interest, the Commission, the Director, Office of New Reactors or Director, Office of Nuclear... licenses pursuant to appendix N of 10 CFR part 50. 2.403 Section 2.403 Energy NUCLEAR REGULATORY COMMISSION...
Code of Federal Regulations, 2011 CFR
2011-01-01
... this chapter for operating licenses for nuclear power reactors, if the Commission has not found that a..., Office of Nuclear Reactor Regulation, as appropriate will, prior to acting thereon, cause to be published... licenses pursuant to appendix N of 10 CFR part 50. 2.403 Section 2.403 Energy NUCLEAR REGULATORY COMMISSION...
10 CFR 52.93 - Exemptions and variances.
Code of Federal Regulations, 2010 CFR
2010-01-01
... referencing a nuclear power reactor manufactured under a manufacturing license issued under subpart F of this... NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS..., site parameters, terms and conditions, or approved design of the manufactured reactor. The Commission...
ERIC Educational Resources Information Center
Aloise, Gene
2008-01-01
There are 37 research reactors in the United States, mostly located on college campuses. Of these, 33 reactors are licensed and regulated by the Nuclear Regulatory Commission (NRC). Four are operated by the Department of Energy (DOE) and are located at three national laboratories. Although less powerful than commercial nuclear power reactors,…
10 CFR 52.155 - Filing of applications.
Code of Federal Regulations, 2010 CFR
2010-01-01
... file an application for a manufacturing license under this subpart with the Director of New Reactors or the Director of Nuclear Reactor Regulation, as appropriate. (b) The application must comply with the... NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS...
10 CFR 52.155 - Filing of applications.
Code of Federal Regulations, 2012 CFR
2012-01-01
... file an application for a manufacturing license under this subpart with the Director of New Reactors or the Director of Nuclear Reactor Regulation, as appropriate. (b) The application must comply with the... NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS...
10 CFR 52.155 - Filing of applications.
Code of Federal Regulations, 2011 CFR
2011-01-01
... file an application for a manufacturing license under this subpart with the Director of New Reactors or the Director of Nuclear Reactor Regulation, as appropriate. (b) The application must comply with the... NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS...
10 CFR 52.155 - Filing of applications.
Code of Federal Regulations, 2014 CFR
2014-01-01
... file an application for a manufacturing license under this subpart with the Director of New Reactors or the Director of Nuclear Reactor Regulation, as appropriate. (b) The application must comply with the... NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS...
10 CFR 52.155 - Filing of applications.
Code of Federal Regulations, 2013 CFR
2013-01-01
... file an application for a manufacturing license under this subpart with the Director of New Reactors or the Director of Nuclear Reactor Regulation, as appropriate. (b) The application must comply with the... NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS...
NASA Astrophysics Data System (ADS)
Nicholson, T. J.; Raione, R.; Ahn, H.; Barnhurst, D.; Giacinto, J.; McBride, M.; Tiruneh, N. D.
2009-12-01
The NRC regulates the civilian use of radioactive materials and facilities in an open and transparent manner. The NRC regulatory criteria are designed to protect human health and safety, and the environment by regulating nuclear facilities. During review of new reactor licensing applications, NRC staff reviews and independently verifies hydrogeologic information submitted by the applicant in several topical areas such as development and testing of Conceptual Site Models (CSM) which may involve perched aquifers; engineered water level fluctuations of surface-water reservoirs; ground-water collector wells and local ground-water uses; design-basis ground-water levels for structural analysis; analysis of scenarios for potential release of radionuclides to the subsurface; deep well injection of effluents; and monitoring to detect radionuclide releases. This information is reviewed in a systematic manner in accordance with NRC requirements and guidance to evaluate safety and environmental impacts and reduce the uncertainties for these impacts. NRC licensing staff is reviewing 14 applications for siting new reactors. Experience gained through these licensing activities has shown the value of using site-specific data to evaluate the CSM and its use to assess design and operational issues. Optimizing the information flow process through a systemically and thorough review process creates efficiencies. Through an iterative process of evaluating various geographical settings and associated ground-water conditions, NRC staff has developed methods to minimize prediction uncertainty through the use of confirmatory analyses performed under conservative, hierarchal approaches.
Code of Federal Regulations, 2014 CFR
2014-01-01
..., tests, analyses and acceptance criteria established under the combined license; (2) The conduct of pre... facility the reactor design for which is approved after December 31, 1993, by the Nuclear Regulatory Commission (and such design or a substantially similar design of comparable capacity was not approved on or...
Code of Federal Regulations, 2012 CFR
2012-01-01
..., tests, analyses and acceptance criteria established under the combined license; (2) The conduct of pre... facility the reactor design for which is approved after December 31, 1993, by the Nuclear Regulatory Commission (and such design or a substantially similar design of comparable capacity was not approved on or...
Code of Federal Regulations, 2010 CFR
2010-01-01
..., tests, analyses and acceptance criteria established under the combined license; (2) The conduct of pre... facility the reactor design for which is approved after December 31, 1993, by the Nuclear Regulatory Commission (and such design or a substantially similar design of comparable capacity was not approved on or...
Code of Federal Regulations, 2011 CFR
2011-01-01
..., tests, analyses and acceptance criteria established under the combined license; (2) The conduct of pre... facility the reactor design for which is approved after December 31, 1993, by the Nuclear Regulatory Commission (and such design or a substantially similar design of comparable capacity was not approved on or...
Code of Federal Regulations, 2013 CFR
2013-01-01
..., tests, analyses and acceptance criteria established under the combined license; (2) The conduct of pre... facility the reactor design for which is approved after December 31, 1993, by the Nuclear Regulatory Commission (and such design or a substantially similar design of comparable capacity was not approved on or...
A Potential NASA Research Reactor to Support NTR Development
NASA Technical Reports Server (NTRS)
Eades, Michael; Gerrish, Harold; Hardin, Leroy
2013-01-01
In support of efforts for research into the design and development of a man rated Nuclear Thermal Rocket (NTR) engine, the National Aeronautics and Space Administration (NASA), Marshall Space Flight Center (MSFC), is evaluating the potential for building a Nuclear Regulatory Commission (NRC) licensed research reactor. The proposed reactor would be licensed by NASA and operated jointly by NASA and university partners. The purpose of this reactor would be to perform further research into the technologies and systems needed for a successful NTR project and promote nuclear training and education.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hosemann, Peter; Kaoumi, Djamel
Nuclear materials are an essential aspect of nuclear engineering. While great effort is spent on designing more advanced reactors or enhancing a reactor’s safety, materials have been the bottleneck of most new developments. The designs of new reactor concepts are driven by neutronic and thermodynamic aspects, leading to unusual coolants (liquid metal, liquid salt, gases), higher temperatures, and higher radiation doses than conventional light water reactors have. However, any (nuclear) engineering design must consider the materials used in the anticipated application in order to ever be realized. Designs which may look easy, simple and efficient considering thermodynamics or neutronic aspectsmore » can show their true difficulty in the materials area, which then prevents them from being deployed. In turn, the materials available are influencing the neutronic and thermodynamic designs and therefore must be considered from the beginning, requiring close collaborations between different aspects of nuclear engineering. If a particular design requires new materials, the licensing of the reactor must be considered, but licensing can be a costly and time consuming process that results in long lead times to realize true materials innovation.« less
10 CFR 2.500 - Scope of subpart.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Procedures Applicable to Proceedings for the Issuance of Licenses To Manufacture Nuclear Power Reactors To Be... consideration in separate hearings of an application for a license to manufacture nuclear power reactors under... 10 Energy 1 2010-01-01 2010-01-01 false Scope of subpart. 2.500 Section 2.500 Energy NUCLEAR...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-08
... NUCLEAR REGULATORY COMMISSION [Docket No. 50-326; NRC-2010-0217] University of California, Irvine; License Renewal for University of California, Irvine Nuclear Reactor Facility; Supplemental Information... Renewal for University of California, Irvine Nuclear Reactor Facility,'' to inform the public that the NRC...
10 CFR 51.105a - Public hearings in proceedings for issuance of manufacturing licenses.
Code of Federal Regulations, 2012 CFR
2012-01-01
... should be issued as proposed by the NRC's Director, Office of New Reactors or Director, Office of Nuclear Reactor Regulation, as appropriate. [73 FR 5724, Jan. 31, 2008] ... manufacturing licenses. 51.105a Section 51.105a Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL...
78 FR 9745 - Kewaunee Power Station; Application for Amendment to Facility Operating License
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-11
... FURTHER INFORMATION CONTACT: Karl Feintuch, Project Manager, Office of Nuclear Reactor Regulation, U.S... Licensing, Office of Nuclear Reactor Regulation. [FR Doc. 2013-03037 Filed 2-8-13; 8:45 am] BILLING CODE... NUCLEAR REGULATORY COMMISSION [Docket No. 50-305; NRC-2013-0028] Kewaunee Power Station...
10 CFR 51.105a - Public hearings in proceedings for issuance of manufacturing licenses.
Code of Federal Regulations, 2010 CFR
2010-01-01
... should be issued as proposed by the NRC's Director, Office of New Reactors or Director, Office of Nuclear Reactor Regulation, as appropriate. [73 FR 5724, Jan. 31, 2008] ... manufacturing licenses. 51.105a Section 51.105a Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL...
10 CFR 51.105a - Public hearings in proceedings for issuance of manufacturing licenses.
Code of Federal Regulations, 2011 CFR
2011-01-01
... should be issued as proposed by the NRC's Director, Office of New Reactors or Director, Office of Nuclear Reactor Regulation, as appropriate. [73 FR 5724, Jan. 31, 2008] ... manufacturing licenses. 51.105a Section 51.105a Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL...
10 CFR 51.105a - Public hearings in proceedings for issuance of manufacturing licenses.
Code of Federal Regulations, 2013 CFR
2013-01-01
... should be issued as proposed by the NRC's Director, Office of New Reactors or Director, Office of Nuclear Reactor Regulation, as appropriate. [73 FR 5724, Jan. 31, 2008] ... manufacturing licenses. 51.105a Section 51.105a Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL...
10 CFR 51.105a - Public hearings in proceedings for issuance of manufacturing licenses.
Code of Federal Regulations, 2014 CFR
2014-01-01
... should be issued as proposed by the NRC's Director, Office of New Reactors or Director, Office of Nuclear Reactor Regulation, as appropriate. [73 FR 5724, Jan. 31, 2008] ... manufacturing licenses. 51.105a Section 51.105a Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Belles, Randy; Jain, Prashant K.; Powers, Jeffrey J.
The Oak Ridge National Laboratory (ORNL) has a rich history of support for light water reactor (LWR) and non-LWR technologies. The ORNL history involves operation of 13 reactors at ORNL including the graphite reactor dating back to World War II, two aqueous homogeneous reactors, two molten salt reactors (MSRs), a fast-burst health physics reactor, and seven LWRs. Operation of the High Flux Isotope Reactor (HFIR) has been ongoing since 1965. Expertise exists amongst the ORNL staff to provide non-LWR training; support evaluation of non-LWR licensing and safety issues; perform modeling and simulation using advanced computational tools; run laboratory experiments usingmore » equipment such as the liquid salt component test facility; and perform in-depth fuel performance and thermal-hydraulic technology reviews using a vast suite of computer codes and tools. Summaries of this expertise are included in this paper.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-26
... NUCLEAR REGULATORY COMMISSION [Docket No. 50-113; NRC-2009-0549] Notice of Issuance of License Amendment Regarding Decommission Plan Approval; University of Arizona Research Reactor The U.S. Nuclear... located within the University of Arizona Nuclear Reactor Laboratory (NRL) on the 325-acre campus of the...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-24
... NUCLEAR REGULATORY COMMISSION Advisory Committee on Reactor Safeguards (ACRS); Meeting of the ACRS Subcommittee on Plant License Renewal The ACRS Subcommittee on Plant License Renewal will hold a meeting on..., ``Generic Aging Lessons Learned (GALL) Report.'' The Subcommittee will hear presentations by and hold...
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 1 2012-01-01 2012-01-01 false Additional standards and provisions affecting class 103... Regulatory Approvals § 50.43 Additional standards and provisions affecting class 103 licenses and... propose nuclear reactor designs which differ significantly from light-water reactor designs that were...
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 1 2014-01-01 2014-01-01 false Additional standards and provisions affecting class 103... Regulatory Approvals § 50.43 Additional standards and provisions affecting class 103 licenses and... propose nuclear reactor designs which differ significantly from light-water reactor designs that were...
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 1 2013-01-01 2013-01-01 false Additional standards and provisions affecting class 103... Regulatory Approvals § 50.43 Additional standards and provisions affecting class 103 licenses and... propose nuclear reactor designs which differ significantly from light-water reactor designs that were...
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 1 2011-01-01 2011-01-01 false Additional standards and provisions affecting class 103... Regulatory Approvals § 50.43 Additional standards and provisions affecting class 103 licenses and... propose nuclear reactor designs which differ significantly from light-water reactor designs that were...
10 CFR 52.91 - Authorization to conduct limited work authorization activities.
Code of Federal Regulations, 2012 CFR
2012-01-01
... determination required by 10 CFR 50.10(e), and the Director of New Reactors or the Director of Nuclear Reactor... activities. 52.91 Section 52.91 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS Combined Licenses § 52.91 Authorization to conduct limited work...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-06
... Licensing Branch III-2, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation. [FR... NUCLEAR REGULATORY COMMISSION [Docket Nos. 50-373 and 50-374; NRC-2011-0234] Exelon Generation.... Nuclear Regulatory Commission (NRC, the Commission) has granted the request of Exelon Generation Company...
10 CFR 52.91 - Authorization to conduct limited work authorization activities.
Code of Federal Regulations, 2013 CFR
2013-01-01
... determination required by 10 CFR 50.10(e), and the Director of New Reactors or the Director of Nuclear Reactor... activities. 52.91 Section 52.91 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS Combined Licenses § 52.91 Authorization to conduct limited work...
10 CFR 52.91 - Authorization to conduct limited work authorization activities.
Code of Federal Regulations, 2014 CFR
2014-01-01
... determination required by 10 CFR 50.10(e), and the Director of New Reactors or the Director of Nuclear Reactor... activities. 52.91 Section 52.91 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS Combined Licenses § 52.91 Authorization to conduct limited work...
10 CFR 52.91 - Authorization to conduct limited work authorization activities.
Code of Federal Regulations, 2011 CFR
2011-01-01
... determination required by 10 CFR 50.10(e), and the Director of New Reactors or the Director of Nuclear Reactor... activities. 52.91 Section 52.91 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS Combined Licenses § 52.91 Authorization to conduct limited work...
10 CFR 52.91 - Authorization to conduct limited work authorization activities.
Code of Federal Regulations, 2010 CFR
2010-01-01
... determination required by 10 CFR 50.10(e), and the Director of New Reactors or the Director of Nuclear Reactor... activities. 52.91 Section 52.91 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS Combined Licenses § 52.91 Authorization to conduct limited work...
NGNP Data Management and Analysis System Analysis and Web Delivery Capabilities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cynthia D. Gentillon
2010-09-01
Projects for the Very High Temperature Reactor Technology Development Office provide data in support of Nuclear Regulatory Commission licensing of the very high temperature reactor. Fuel and materials to be used in the reactor are tested and characterized to quantify performance in high-temperature and high-fluence environments. In addition, thermal-hydraulic experiments are conducted to validate codes used to assess reactor safety. The Very High Temperature Reactor Technology Development Office has established the NGNP Data Management and Analysis System (NDMAS) at the Idaho National Laboratory to ensure that very high temperature reactor data are (1) qualified for use, (2) stored in amore » readily accessible electronic form, and (3) analyzed to extract useful results. This document focuses on the third NDMAS objective. It describes capabilities for displaying the data in meaningful ways and for data analysis to identify useful relationships among the measured quantities.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-03
... Methodology for Boiling Water Reactors, June 2011. To support use of Topical Report ANP-10307PA, Revision 0... the NRC's E-Filing system does not support unlisted software, and the NRC Meta System Help Desk will... Water Reactors with AREVA Topical Report ANP- 10307PA, Revision 0, ``AREVA MCPR Safety Limit Methodology...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-21
... reactors or for activities associated with review of applications for early site permits and combined licenses (COL) for the Office of New Reactors (NRO). DATES: The effective date of this SRP update is... Rulemaking Web Site: Go to http://www.regulations.gov and search for Docket ID NRC-2010-0138. Address...
Code of Federal Regulations, 2010 CFR
2010-01-01
... REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING PROCEEDINGS AND ISSUANCE OF ORDERS Additional... Issuance of Limited Work Authorizations Early Partial Decisions on Site Suitability-Combined License Under... Director of the Office of New Reactors or the Director of the Office of Nuclear Reactor Regulation, as...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-10
... State University of New York, University of Buffalo Reactor Facility AGENCY: Nuclear Regulatory... staff at 1-800-397-4209, 301-415- 4737, or by email to [email protected] . The University of Buffalo... license amendment application from the State University of New York, University of Buffalo requesting...
Code of Federal Regulations, 2012 CFR
2012-01-01
... complete and acceptable for docketing under § 2.101(a)(3), the Director of the Office of New Reactors or the Director of the Office of Nuclear Reactor Regulation, as appropriate, shall determine whether the... a combined license proceeding. 2.629 Section 2.629 Energy NUCLEAR REGULATORY COMMISSION RULES OF...
Code of Federal Regulations, 2011 CFR
2011-01-01
... complete and acceptable for docketing under § 2.101(a)(3), the Director of the Office of New Reactors or the Director of the Office of Nuclear Reactor Regulation, as appropriate, shall determine whether the... a combined license proceeding. 2.629 Section 2.629 Energy NUCLEAR REGULATORY COMMISSION RULES OF...
Safety and licensing of a small modular gas-cooled reactor system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Brown, N.W.; Kelley, A.P. Jr.
A modular side-by-side high-temperature gas-cooled reactor (SBS-HTGR) is being developed by Interatom/Kraftwerk Union (KWU). The General Electric Company and Interatom/KWU entered into a proprietary working agreement to continue develop jointly of the SBS-HTGR. A study on adapting the SBS-HTGR for application in the US has been completed. The study investigated the safety characteristics and the use of this type of design in an innovative approach to licensing. The safety objective guiding the design of the modular SBS-HTGR is to control radionuclide release by the retention of fission products within the fuel particles with minimal reliance on active design features. Themore » philosophy on which this objective is predicated is that by providing a simple safety case, the safety criteria can be demonstrated as being met with high confidence through conduct of a full-scale module safety test.« less
Code qualification of structural materials for AFCI advanced recycling reactors.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Natesan, K.; Li, M.; Majumdar, S.
2012-05-31
This report summarizes the further findings from the assessments of current status and future needs in code qualification and licensing of reference structural materials and new advanced alloys for advanced recycling reactors (ARRs) in support of Advanced Fuel Cycle Initiative (AFCI). The work is a combined effort between Argonne National Laboratory (ANL) and Oak Ridge National Laboratory (ORNL) with ANL as the technical lead, as part of Advanced Structural Materials Program for AFCI Reactor Campaign. The report is the second deliverable in FY08 (M505011401) under the work package 'Advanced Materials Code Qualification'. The overall objective of the Advanced Materials Codemore » Qualification project is to evaluate key requirements for the ASME Code qualification and the Nuclear Regulatory Commission (NRC) approval of structural materials in support of the design and licensing of the ARR. Advanced materials are a critical element in the development of sodium reactor technologies. Enhanced materials performance not only improves safety margins and provides design flexibility, but also is essential for the economics of future advanced sodium reactors. Code qualification and licensing of advanced materials are prominent needs for developing and implementing advanced sodium reactor technologies. Nuclear structural component design in the U.S. must comply with the ASME Boiler and Pressure Vessel Code Section III (Rules for Construction of Nuclear Facility Components) and the NRC grants the operational license. As the ARR will operate at higher temperatures than the current light water reactors (LWRs), the design of elevated-temperature components must comply with ASME Subsection NH (Class 1 Components in Elevated Temperature Service). However, the NRC has not approved the use of Subsection NH for reactor components, and this puts additional burdens on materials qualification of the ARR. In the past licensing review for the Clinch River Breeder Reactor Project (CRBRP) and the Power Reactor Innovative Small Module (PRISM), the NRC/Advisory Committee on Reactor Safeguards (ACRS) raised numerous safety-related issues regarding elevated-temperature structural integrity criteria. Most of these issues remained unresolved today. These critical licensing reviews provide a basis for the evaluation of underlying technical issues for future advanced sodium-cooled reactors. Major materials performance issues and high temperature design methodology issues pertinent to the ARR are addressed in the report. The report is organized as follows: the ARR reference design concepts proposed by the Argonne National Laboratory and four industrial consortia were reviewed first, followed by a summary of the major code qualification and licensing issues for the ARR structural materials. The available database is presented for the ASME Code-qualified structural alloys (e.g. 304, 316 stainless steels, 2.25Cr-1Mo, and mod.9Cr-1Mo), including physical properties, tensile properties, impact properties and fracture toughness, creep, fatigue, creep-fatigue interaction, microstructural stability during long-term thermal aging, material degradation in sodium environments and effects of neutron irradiation for both base metals and weld metals. An assessment of modified versions of Type 316 SS, i.e. Type 316LN and its Japanese version, 316FR, was conducted to provide a perspective for codification of 316LN or 316FR in Subsection NH. Current status and data availability of four new advanced alloys, i.e. NF616, NF616+TMT, NF709, and HT-UPS, are also addressed to identify the R&D needs for their code qualification for ARR applications. For both conventional and new alloys, issues related to high temperature design methodology are described to address the needs for improvements for the ARR design and licensing. Assessments have shown that there are significant data gaps for the full qualification and licensing of the ARR structural materials. Development and evaluation of structural materials require a variety of experimental facilities that have been seriously degraded in the past. The availability and additional needs for the key experimental facilities are summarized at the end of the report. Detailed information covered in each Chapter is given.« less
Advanced Instrumentation for Transient Reactor Testing
DOE Office of Scientific and Technical Information (OSTI.GOV)
Corradini, Michael L.; Anderson, Mark; Imel, George
Transient testing involves placing fuel or material into the core of specialized materials test reactors that are capable of simulating a range of design basis accidents, including reactivity insertion accidents, that require the reactor produce short bursts of intense highpower neutron flux and gamma radiation. Testing fuel behavior in a prototypic neutron environment under high-power, accident-simulation conditions is a key step in licensing nuclear fuels for use in existing and future nuclear power plants. Transient testing of nuclear fuels is needed to develop and prove the safety basis for advanced reactors and fuels. In addition, modern fuel development and designmore » increasingly relies on modeling and simulation efforts that must be informed and validated using specially designed material performance separate effects studies. These studies will require experimental facilities that are able to support variable scale, highly instrumented tests providing data that have appropriate spatial and temporal resolution. Finally, there are efforts now underway to develop advanced light water reactor (LWR) fuels with enhanced performance and accident tolerance. These advanced reactor designs will also require new fuel types. These new fuels need to be tested in a controlled environment in order to learn how they respond to accident conditions. For these applications, transient reactor testing is needed to help design fuels with improved performance. In order to maximize the value of transient testing, there is a need for in-situ transient realtime imaging technology (e.g., the neutron detection and imaging system like the hodoscope) to see fuel motion during rapid transient excursions with a higher degree of spatial and temporal resolution and accuracy. There also exists a need for new small, compact local sensors and instrumentation that are capable of collecting data during transients (e.g., local displacements, temperatures, thermal conductivity, neutron flux, etc.).« less
Plant maintenance and advanced reactors issue, 2004
DOE Office of Scientific and Technical Information (OSTI.GOV)
Agnihotri, Newal
2004-09-15
The focus of the September-October issue is on plant maintenance and advanced reactors. Major articles/reports in this issue include: Optimism about the future of nuclear power, by Ruth G. Shaw, Duke Power Company; Licensed in three countries, by GE Energy; Enhancing public acceptance, by Westinghouse Electric Company; Standardized MOV program, by Ted Neckowicz, Exelon; Inservice testing, by Steven Unikewicz, U.S. Nuclear Regulatory Commission; Asian network for education, Fatimah Mohd Amin, Malaysian Institute for Nuclear Technology Research; and, Cooling water intake optimization, by Jeffrey M. Jones and Bert Mayer, P.E., Framatome ANP.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-14
... NUCLEAR REGULATORY COMMISSION [NRC-2013-0128] All Operating Boiling-Water Reactor Licensees With Mark I And Mark II Containments; Docket Nos. (As Shown In Attachment 1), License Nos. (As Shown In Attachment 1), EA-13-109; Order Modifying Licenses With Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident...
Code of Federal Regulations, 2014 CFR
2014-01-01
...), the Director of the Office of New Reactors or the Director of the Office of Nuclear Reactor Regulation... 10 Energy 1 2014-01-01 2014-01-01 false Finality of partial decision on site suitability issues in a combined license proceeding. 2.629 Section 2.629 Energy NUCLEAR REGULATORY COMMISSION AGENCY RULES...
Code of Federal Regulations, 2013 CFR
2013-01-01
...), the Director of the Office of New Reactors or the Director of the Office of Nuclear Reactor Regulation... 10 Energy 1 2013-01-01 2013-01-01 false Finality of partial decision on site suitability issues in a combined license proceeding. 2.629 Section 2.629 Energy NUCLEAR REGULATORY COMMISSION AGENCY RULES...
Quality Assurance Program Plan for SFR Metallic Fuel Data Qualification
DOE Office of Scientific and Technical Information (OSTI.GOV)
Benoit, Timothy; Hlotke, John Daniel; Yacout, Abdellatif
2017-07-05
This document contains an evaluation of the applicability of the current Quality Assurance Standards from the American Society of Mechanical Engineers Standard NQA-1 (NQA-1) criteria and identifies and describes the quality assurance process(es) by which attributes of historical, analytical, and other data associated with sodium-cooled fast reactor [SFR] metallic fuel and/or related reactor fuel designs and constituency will be evaluated. This process is being instituted to facilitate validation of data to the extent that such data may be used to support future licensing efforts associated with advanced reactor designs. The initial data to be evaluated under this program were generatedmore » during the US Integral Fast Reactor program between 1984-1994, where the data includes, but is not limited to, research and development data and associated documents, test plans and associated protocols, operations and test data, technical reports, and information associated with past United States Nuclear Regulatory Commission reviews of SFR designs.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gougar, Hans David
2015-10-01
The United States Department of Energy (DOE) commissioned a study the suitability of different advanced reactor concepts to support materials irradiations (i.e. a test reactor) or to demonstrate an advanced power plant/fuel cycle concept (demonstration reactor). As part of the study, an assessment of the technical maturity of the individual concepts was undertaken to see which, if any, can support near-term deployment. A Working Group composed of the authors of this document performed the maturity assessment using the Technical Readiness Levels as defined in DOE’s Technology Readiness Guide . One representative design was selected for assessment from of each ofmore » the six Generation-IV reactor types: gas-cooled fast reactor (GFR), lead-cooled fast reactor (LFR), molten salt reactor (MSR), supercritical water-cooled reactor (SCWR), sodium-cooled fast reactor (SFR), and very high temperature reactor (VHTR). Background information was obtained from previous detailed evaluations such as the Generation-IV Roadmap but other technical references were also used including consultations with concept proponents and subject matter experts. Outside of Generation IV activity in which the US is a party, non-U.S. experience or data sources were generally not factored into the evaluations as one cannot assume that this data is easily available or of sufficient quality to be used for licensing a US facility. The Working Group established the scope of the assessment (which systems and subsystems needed to be considered), adapted a specific technology readiness scale, and scored each system through discussions designed to achieve internal consistency across concepts. In general, the Working Group sought to determine which of the reactor options have sufficient maturity to serve either the test or demonstration reactor missions.« less
Plum Brook Reactor Facility Control Room during Facility Startup
1961-02-21
Operators test the National Aeronautics and Space Administration’s (NASA) Plum Brook Reactor Facility systems in the months leading up to its actual operation. The “Reactor On” signs are illuminated but the reactor core was not yet ready for chain reactions. Just a couple weeks after this photograph, Plum Brook Station held a media open house to unveil the 60-megawatt test reactor near Sandusky, Ohio. More than 60 members of the print media and radio and television news services met at the site to talk with community leaders and representatives from NASA and Atomic Energy Commission. The Plum Brook reactor went critical for the first time on the evening of June 14, 1961. It was not until April 1963 that the reactor reached its full potential of 60 megawatts. The reactor control room, located on the second floor of the facility, was run by licensed operators. The operators manually operated the shim rods which adjusted the chain reaction in the reactor core. The regulating rods could partially or completely shut down the reactor. The control room also housed remote area monitoring panels and other monitoring equipment that allowed operators to monitor radiation sensors located throughout the facility and to scram the reactor instantly if necessary. The color of the indicator lights corresponded with the elevation of the detectors in the various buildings. The reactor could also shut itself down automatically if the monitors detected any sudden irregularities.
Code of Federal Regulations, 2010 CFR
2010-01-01
... COMMISSION (CONTINUED) REACTOR SITE CRITERIA § 100.3 Definitions. As used in this part: Combined license... power facilities. Exclusion area means that area surrounding the reactor, in which the reactor licensee.... Activities unrelated to operation of the reactor may be permitted in an exclusion area under appropriate...
Code of Federal Regulations, 2011 CFR
2011-01-01
... COMMISSION (CONTINUED) REACTOR SITE CRITERIA § 100.3 Definitions. As used in this part: Combined license... power facilities. Exclusion area means that area surrounding the reactor, in which the reactor licensee.... Activities unrelated to operation of the reactor may be permitted in an exclusion area under appropriate...
10 CFR 73.60 - Additional requirements for physical protection at nonpower reactors.
Code of Federal Regulations, 2010 CFR
2010-01-01
... nonpower reactors. 73.60 Section 73.60 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) PHYSICAL PROTECTION... requirements for physical protection at nonpower reactors. Each nonpower reactor licensee who, pursuant to the... nonpower reactors licensed to operate at or above a power level of 2 megawatts thermal. [38 FR 35430, Dec...
10 CFR 73.60 - Additional requirements for physical protection at nonpower reactors.
Code of Federal Regulations, 2011 CFR
2011-01-01
... nonpower reactors. 73.60 Section 73.60 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) PHYSICAL PROTECTION... requirements for physical protection at nonpower reactors. Each nonpower reactor licensee who, pursuant to the... nonpower reactors licensed to operate at or above a power level of 2 megawatts thermal. [38 FR 35430, Dec...
Development of ASTM Standard for SiC-SiC Joint Testing Final Scientific/Technical Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jacobsen, George; Back, Christina
2015-10-30
As the nuclear industry moves to advanced ceramic based materials for cladding and core structural materials for a variety of advanced reactors, new standards and test methods are required for material development and licensing purposes. For example, General Atomics (GA) is actively developing silicon carbide (SiC) based composite cladding (SiC-SiC) for its Energy Multiplier Module (EM2), a high efficiency gas cooled fast reactor. Through DOE funding via the advanced reactor concept program, GA developed a new test method for the nominal joint strength of an endplug sealed to advanced ceramic tubes, Fig. 1-1, at ambient and elevated temperatures called themore » endplug pushout (EPPO) test. This test utilizes widely available universal mechanical testers coupled with clam shell heaters, and specimen size is relatively small, making it a viable post irradiation test method. The culmination of this effort was a draft of an ASTM test standard that will be submitted for approval to the ASTM C28 ceramic committee. Once the standard has been vetted by the ceramics test community, an industry wide standard methodology to test joined tubular ceramic components will be available for the entire nuclear materials community.« less
77 FR 37074 - License Amendment Request From the Alan J. Blotcky Reactor Facility
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-20
... the Alan J. Blotcky Reactor Facility AGENCY: Nuclear Regulatory Commission. ACTION: Notice of... section of this document. FOR FURTHER INFORMATION CONTACT: Theodore Smith, Project Manager, Reactor... provided the first time that a document is referenced. The Alan J. Blotcky Reactor Facility Decommissioning...
Testing of a Transport Cask for Research Reactor Spent Fuel - 13003
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mourao, Rogerio P.; Leite da Silva, Luiz; Miranda, Carlos A.
2013-07-01
Since the beginning of the last decade three Latin American countries that operate research reactors - Argentina, Brazil and Chile - have been joining efforts to improve the regional capability in the management of spent fuel elements from the TRIGA and MTR reactors operated in the region. A main drive in this initiative, sponsored by the International Atomic Energy Agency, is the fact that no definite solution regarding the back end of the research reactor fuel cycle has been taken by any of the participating country. However, any long-term solution - either disposition in a repository or storage away frommore » reactor - will involve at some stage the transportation of the spent fuel through public roads. Therefore, a licensed cask that provides adequate shielding, assurance of subcriticality, and conformance to internationally accepted safety, security and safeguards regimes is considered a strategic part of any future solution to be adopted at a regional level. As a step in this direction, a packaging for the transport of irradiated fuel for MTR and TRIGA research reactors was designed by the tri-national team and a half-scale model equipped with the MTR version of the internal basket was constructed in Argentina and Brazil and tested in Brazil. Three test campaigns have been carried out so far, covering both normal conditions of transportation and hypothetical accident conditions. After failing the tests in the first two test series, the specimen successfully underwent the last test sequence. A second specimen, incorporating the structural improvements in view of the previous tests results, will be tested in the near future. Numerical simulations of the free drop and thermal tests are being carried out in parallel, in order to validate the computational modeling that is going to be used as a support for the package certification. (authors)« less
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false [Reserved] 171.21 Section 171.21 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ANNUAL FEES FOR REACTOR LICENSES AND FUEL CYCLE LICENSES AND MATERIALS LICENSES, INCLUDING HOLDERS OF CERTIFICATES OF COMPLIANCE, REGISTRATIONS, AND QUALITY ASSURANCE PROGRAM APPROVALS AND...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-29
... correspondence to addressees and subscribers through a computer-based email distribution system. Since then, the... Electronic Operating Reactor Correspondence The U.S. Nuclear Regulatory Commission (NRC) is issuing this... available operating reactor licensing correspondence, effective December 9, 2013. Official agency records...
10 CFR 73.58 - Safety/security interface requirements for nuclear power reactors.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Safety/security interface requirements for nuclear power reactors. 73.58 Section 73.58 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) PHYSICAL PROTECTION OF... requirements for nuclear power reactors. (a) Each operating nuclear power reactor licensee with a license...
10 CFR 73.58 - Safety/security interface requirements for nuclear power reactors.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 2 2013-01-01 2013-01-01 false Safety/security interface requirements for nuclear power reactors. 73.58 Section 73.58 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) PHYSICAL PROTECTION OF... requirements for nuclear power reactors. (a) Each operating nuclear power reactor licensee with a license...
10 CFR 73.58 - Safety/security interface requirements for nuclear power reactors.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 2 2014-01-01 2014-01-01 false Safety/security interface requirements for nuclear power reactors. 73.58 Section 73.58 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) PHYSICAL PROTECTION OF... requirements for nuclear power reactors. (a) Each operating nuclear power reactor licensee with a license...
10 CFR 73.58 - Safety/security interface requirements for nuclear power reactors.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 2 2011-01-01 2011-01-01 false Safety/security interface requirements for nuclear power reactors. 73.58 Section 73.58 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) PHYSICAL PROTECTION OF... requirements for nuclear power reactors. (a) Each operating nuclear power reactor licensee with a license...
10 CFR 73.58 - Safety/security interface requirements for nuclear power reactors.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 2 2012-01-01 2012-01-01 false Safety/security interface requirements for nuclear power reactors. 73.58 Section 73.58 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) PHYSICAL PROTECTION OF... requirements for nuclear power reactors. (a) Each operating nuclear power reactor licensee with a license...
10 CFR 140.72 - Indemnity agreements.
Code of Federal Regulations, 2014 CFR
2014-01-01
... (issued pursuant to part 50 of this chapter) authorizing the licensee to operate the nuclear reactor... the licensee to possess and store special nuclear material at the site of the nuclear reactor for use as fuel in operation of the nuclear reactor after issuance of an operating license for the reactor...
10 CFR 140.72 - Indemnity agreements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... (issued pursuant to part 50 of this chapter) authorizing the licensee to operate the nuclear reactor... the licensee to possess and store special nuclear material at the site of the nuclear reactor for use as fuel in operation of the nuclear reactor after issuance of an operating license for the reactor...
Disposition of Chicago Pile 5 (CP-5) Converter Tubes in the 10-160B Cask
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pancake, Daniel C.; Rock, Cynthia
This paper will focus on the unique characterization, packaging, and transportation issues associated with the disposition of the two CP-5 Converter Tube assemblies from Argonne National Laboratory. The converter tubes were constructed of combinations of HEU and alloys of zirconium, and were part of the original research facilities attached to the CP-5 reactor during operating evolutions. These assemblies were heavily irradiated during their operational lifetime, and were segregated from the balance of irradiated test specimens when the reactor was deactivated and slated for Decontamination and Demolition (D&D). In addition, the substantial contribution of fissile material to the assemblies’ inventory mademore » the potential disposition pathways extremely challenging. As a result, these items became part of Argonne’s legacy “nuclear footprint”, and were added to the Nuclear Footprint Reduction Project scope for disposition. The Project was responsible for the size reduction and characterization of these items, as well as the ultimate disposition. After negotiating a disposal pathway for these tubes, there were significant transportation issues that required a small team to overcome, in order to successfully ship these items to the Nevada National Security Site (NNSS). The Project team at Argonne, technical support from transportation specialists, licensing support from the 10-160B license owner, the Savanah River National Lab (SRNL) Packaging Certification Team (PCT, and the DOE EM-33 staff contributed to license and safety analysis report amendments that eventually authorized the shipment of the material. The paper will identify the organizations, and the specific actions, required to successfully make three “one of a kind” shipments of irradiated test specimen material. This will include the unique packaging configurations, contents modification for the cask license (via the Amendment process), criticality evaluations, and associated review and approval processes.« less
10 CFR 171.9 - Communications.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 2 2013-01-01 2013-01-01 false Communications. 171.9 Section 171.9 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ANNUAL FEES FOR REACTOR LICENSES AND FUEL CYCLE LICENSES AND MATERIALS... APPROVALS AND GOVERNMENT AGENCIES LICENSED BY THE NRC § 171.9 Communications. All communications concerning...
10 CFR 171.9 - Communications.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 2 2014-01-01 2014-01-01 false Communications. 171.9 Section 171.9 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ANNUAL FEES FOR REACTOR LICENSES AND FUEL CYCLE LICENSES AND MATERIALS... APPROVALS AND GOVERNMENT AGENCIES LICENSED BY THE NRC § 171.9 Communications. All communications concerning...
10 CFR 171.9 - Communications.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Communications. 171.9 Section 171.9 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ANNUAL FEES FOR REACTOR LICENSES AND FUEL CYCLE LICENSES AND MATERIALS... APPROVALS AND GOVERNMENT AGENCIES LICENSED BY THE NRC § 171.9 Communications. All communications concerning...
FFTF Passive Safety Test Data for Benchmarks for New LMR Designs
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wootan, David W.; Casella, Andrew M.
Liquid Metal Reactors (LMRs) continue to be considered as an attractive concept for advanced reactor design. Software packages such as SASSYS are being used to im-prove new LMR designs and operating characteristics. Significant cost and safety im-provements can be realized in advanced liquid metal reactor designs by emphasizing inherent or passive safety through crediting the beneficial reactivity feedbacks associ-ated with core and structural movement. This passive safety approach was adopted for the Fast Flux Test Facility (FFTF), and an experimental program was conducted to characterize the structural reactivity feedback. The FFTF passive safety testing pro-gram was developed to examine howmore » specific design elements influenced dynamic re-activity feedback in response to a reactivity input and to demonstrate the scalability of reactivity feedback results to reactors of current interest. The U.S. Department of En-ergy, Office of Nuclear Energy Advanced Reactor Technology program is in the pro-cess of preserving, protecting, securing, and placing in electronic format information and data from the FFTF, including the core configurations and data collected during the passive safety tests. Benchmarks based on empirical data gathered during operation of the Fast Flux Test Facility (FFTF) as well as design documents and post-irradiation examination will aid in the validation of these software packages and the models and calculations they produce. Evaluation of these actual test data could provide insight to improve analytical methods which may be used to support future licensing applications for LMRs« less
10 CFR 52.171 - Finality of manufacturing licenses; information requests.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 2 2013-01-01 2013-01-01 false Finality of manufacturing licenses; information requests. 52.171 Section 52.171 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND... manufactured reactor, the costs and benefits of severe accident mitigation design alternatives, and the bases...
10 CFR 52.171 - Finality of manufacturing licenses; information requests.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 2 2011-01-01 2011-01-01 false Finality of manufacturing licenses; information requests. 52.171 Section 52.171 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND... manufactured reactor, the costs and benefits of severe accident mitigation design alternatives, and the bases...
10 CFR 52.171 - Finality of manufacturing licenses; information requests.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 2 2014-01-01 2014-01-01 false Finality of manufacturing licenses; information requests. 52.171 Section 52.171 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND... manufactured reactor, the costs and benefits of severe accident mitigation design alternatives, and the bases...
10 CFR 52.171 - Finality of manufacturing licenses; information requests.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 2 2012-01-01 2012-01-01 false Finality of manufacturing licenses; information requests. 52.171 Section 52.171 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND... manufactured reactor, the costs and benefits of severe accident mitigation design alternatives, and the bases...
10 CFR 50.36a - Technical specifications on effluents from nuclear power reactors.
Code of Federal Regulations, 2011 CFR
2011-01-01
... reactors. 50.36a Section 50.36a Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND...; Ineligibility of Certain Applicants § 50.36a Technical specifications on effluents from nuclear power reactors..., including expected occurrences, as low as is reasonably achievable, each licensee of a nuclear power reactor...
10 CFR 1.44 - Office of New Reactors.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 1 2011-01-01 2011-01-01 false Office of New Reactors. 1.44 Section 1.44 Energy NUCLEAR... Office of New Reactors. The Office of New Reactors— (a) Develops, promulgates and implements regulations... safeguarding of nuclear reactor facilities licensed under part 52 of this chapter prior to initial commencement...
10 CFR 50.36a - Technical specifications on effluents from nuclear power reactors.
Code of Federal Regulations, 2010 CFR
2010-01-01
... reactors. 50.36a Section 50.36a Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND...; Ineligibility of Certain Applicants § 50.36a Technical specifications on effluents from nuclear power reactors..., including expected occurrences, as low as is reasonably achievable, each licensee of a nuclear power reactor...
10 CFR 1.44 - Office of New Reactors.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 1 2010-01-01 2010-01-01 false Office of New Reactors. 1.44 Section 1.44 Energy NUCLEAR... Office of New Reactors. The Office of New Reactors— (a) Develops, promulgates and implements regulations... safeguarding of nuclear reactor facilities licensed under part 52 of this chapter prior to initial commencement...
10 CFR 50.36a - Technical specifications on effluents from nuclear power reactors.
Code of Federal Regulations, 2014 CFR
2014-01-01
... reactors. 50.36a Section 50.36a Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND...; Ineligibility of Certain Applicants § 50.36a Technical specifications on effluents from nuclear power reactors..., including expected occurrences, as low as is reasonably achievable, each licensee of a nuclear power reactor...
10 CFR 1.44 - Office of New Reactors.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 1 2013-01-01 2013-01-01 false Office of New Reactors. 1.44 Section 1.44 Energy NUCLEAR... safeguarding of nuclear reactor facilities licensed under part 52 of this chapter prior to initial commencement... Office of New Reactors. The Office of New Reactors— (a) Develops, promulgates and implements regulations...
10 CFR 1.44 - Office of New Reactors.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 1 2014-01-01 2014-01-01 false Office of New Reactors. 1.44 Section 1.44 Energy NUCLEAR... safeguarding of nuclear reactor facilities licensed under part 52 of this chapter prior to initial commencement... Office of New Reactors. The Office of New Reactors— (a) Develops, promulgates and implements regulations...
10 CFR 1.44 - Office of New Reactors.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 1 2012-01-01 2012-01-01 false Office of New Reactors. 1.44 Section 1.44 Energy NUCLEAR... safeguarding of nuclear reactor facilities licensed under part 52 of this chapter prior to initial commencement... Office of New Reactors. The Office of New Reactors— (a) Develops, promulgates and implements regulations...
10 CFR 72.16 - Filing of application for specific license.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 2 2011-01-01 2011-01-01 false Filing of application for specific license. 72.16 Section 72.16 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR THE INDEPENDENT STORAGE OF SPENT NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C...
10 CFR 72.60 - Modification, revocation, and suspension of license.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Modification, revocation, and suspension of license. 72.60 Section 72.60 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR THE INDEPENDENT STORAGE OF SPENT NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C...
10 CFR 72.56 - Application for amendment of license.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Application for amendment of license. 72.56 Section 72.56 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR THE INDEPENDENT STORAGE OF SPENT NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C WASTE...
10 CFR 72.42 - Duration of license; renewal.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Duration of license; renewal. 72.42 Section 72.42 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR THE INDEPENDENT STORAGE OF SPENT NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C WASTE Issuance and...
10 CFR 72.40 - Issuance of license.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Issuance of license. 72.40 Section 72.40 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR THE INDEPENDENT STORAGE OF SPENT NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C WASTE Issuance and Conditions of...
10 CFR 72.16 - Filing of application for specific license.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Filing of application for specific license. 72.16 Section 72.16 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR THE INDEPENDENT STORAGE OF SPENT NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-31
... environmental effect of renewing the operating license of a nuclear power plant. This document is necessary to..., Environmental impact statement, Nuclear materials, Nuclear power plants and reactors, Reporting and... Environmental Review for Renewal of Nuclear Power Plant Operating Licenses; Correction AGENCY: Nuclear...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-10
..., Classified information, Criminal penalties, Fire protection, Intergovernmental relations, Nuclear power plants and reactors, Radiation protection, Reactor siting criteria, Reporting and recordkeeping...
Code of Federal Regulations, 2014 CFR
2014-01-01
... Nuclear Fuel Storage Capacity at Civilian Nuclear Power Reactors § 2.1105 Definitions. As used in this part: (a) Civilian nuclear power reactor means a civilian nuclear power plant required to be licensed... nuclear fuel means fuel that has been withdrawn from a nuclear reactor following irradiation, the...
Code of Federal Regulations, 2013 CFR
2013-01-01
... Nuclear Fuel Storage Capacity at Civilian Nuclear Power Reactors § 2.1105 Definitions. As used in this part: (a) Civilian nuclear power reactor means a civilian nuclear power plant required to be licensed... nuclear fuel means fuel that has been withdrawn from a nuclear reactor following irradiation, the...
NGNP Data Management and Analysis System Modeling Capabilities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cynthia D. Gentillon
2009-09-01
Projects for the very-high-temperature reactor (VHTR) program provide data in support of Nuclear Regulatory Commission licensing of the VHTR. Fuel and materials to be used in the reactor are tested and characterized to quantify performance in high temperature and high fluence environments. In addition, thermal-hydraulic experiments are conducted to validate codes used to assess reactor safety. The VHTR Program has established the NGNP Data Management and Analysis System (NDMAS) to ensure that VHTR data are (1) qualified for use, (2) stored in a readily accessible electronic form, and (3) analyzed to extract useful results. This document focuses on the thirdmore » NDMAS objective. It describes capabilities for displaying the data in meaningful ways and identifying relationships among the measured quantities that contribute to their understanding.« less
10 CFR Appendix A to Part 52 - Design Certification Rule for the U.S. Advanced Boiling Water Reactor
Code of Federal Regulations, 2010 CFR
2010-01-01
... Water Reactor A Appendix A to Part 52 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES... Rule for the U.S. Advanced Boiling Water Reactor I. Introduction Appendix A constitutes the standard design certification for the U.S. Advanced Boiling Water Reactor (ABWR) design, in accordance with 10 CFR...
10 CFR Appendix A to Part 52 - Design Certification Rule for the U.S. Advanced Boiling Water Reactor
Code of Federal Regulations, 2011 CFR
2011-01-01
... Water Reactor A Appendix A to Part 52 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES... Rule for the U.S. Advanced Boiling Water Reactor I. Introduction Appendix A constitutes the standard design certification for the U.S. Advanced Boiling Water Reactor (ABWR) design, in accordance with 10 CFR...
Code of Federal Regulations, 2014 CFR
2014-01-01
... domestic non-power reactors. 50.64 Section 50.64 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF... Director of the Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC... Director of the Office of Nuclear Reactor Regulation a written proposal for meeting the requirements of...
Code of Federal Regulations, 2012 CFR
2012-01-01
... domestic non-power reactors. 50.64 Section 50.64 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF... Director of the Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC... Director of the Office of Nuclear Reactor Regulation a written proposal for meeting the requirements of...
Code of Federal Regulations, 2013 CFR
2013-01-01
... domestic non-power reactors. 50.64 Section 50.64 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF... Director of the Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC... Director of the Office of Nuclear Reactor Regulation a written proposal for meeting the requirements of...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-12
... Applications for Instrumentation and Control Upgrades for Non-Power Reactors AGENCY: Nuclear Regulatory... (NRC or the Commission) is requesting public comment on Chapter 7, Section 7.3, Reactor Control System...-Power Reactors: Format and Content,'' for instrumentation and control (I&C) upgrades and NUREG-1537...
10 CFR 140.96 - Appendix F-Indemnity locations.
Code of Federal Regulations, 2010 CFR
2010-01-01
... construction area of the nuclear power reactor, as determined by the Commission. Such area will not necessarily... or combined license under 10 CFR part 52 is issued for such additional nuclear power reactors. (2) In... an existing nuclear power reactor, the geographical boundaries of the indemnity location shall...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-02
... Pressurized Water Reactor Spent Fuel in Transportation and Storage Casks AGENCY: Nuclear Regulatory Commission... of pressurized water reactor spent nuclear fuel (SNF) in transportation packages and storage casks... for the licensing basis, (b) provide recommendations regarding advanced isotopic depletion and...
10 CFR 50.72 - Immediate notification requirements for operating nuclear power reactors.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 1 2012-01-01 2012-01-01 false Immediate notification requirements for operating nuclear power reactors. 50.72 Section 50.72 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF... notification requirements for operating nuclear power reactors. (a) General requirements. 1 (1) Each nuclear...
10 CFR 50.44 - Combustible gas control for nuclear power reactors.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 1 2013-01-01 2013-01-01 false Combustible gas control for nuclear power reactors. 50.44 Section 50.44 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION... for nuclear power reactors. (a) Definitions—(1) Inerted atmosphere means a containment atmosphere with...
10 CFR 50.44 - Combustible gas control for nuclear power reactors.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 1 2011-01-01 2011-01-01 false Combustible gas control for nuclear power reactors. 50.44 Section 50.44 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION... for nuclear power reactors. (a) Definitions—(1) Inerted atmosphere means a containment atmosphere with...
10 CFR 50.72 - Immediate notification requirements for operating nuclear power reactors.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 1 2013-01-01 2013-01-01 false Immediate notification requirements for operating nuclear power reactors. 50.72 Section 50.72 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF... notification requirements for operating nuclear power reactors. (a) General requirements. 1 (1) Each nuclear...
Code of Federal Regulations, 2011 CFR
2011-01-01
... domestic non-power reactors. 50.64 Section 50.64 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF... Permits § 50.64 Limitations on the use of highly enriched uranium (HEU) in domestic non-power reactors. (a) Applicability. The requirements of this section apply to all non-power reactors. (b) Requirements. (1) The...
Code of Federal Regulations, 2010 CFR
2010-01-01
... domestic non-power reactors. 50.64 Section 50.64 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF... Permits § 50.64 Limitations on the use of highly enriched uranium (HEU) in domestic non-power reactors. (a) Applicability. The requirements of this section apply to all non-power reactors. (b) Requirements. (1) The...
10 CFR 50.21 - Class 104 licenses; for medical therapy and research and development facilities.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 1 2010-01-01 2010-01-01 false Class 104 licenses; for medical therapy and research and...; for medical therapy and research and development facilities. A class 104 license will be issued, to an... Administration entered into under the Cooperative Power Reactor Demonstration Program, except as otherwise...
Code of Federal Regulations, 2010 CFR
2010-01-01
... a combined license proceeding. 2.629 Section 2.629 Energy NUCLEAR REGULATORY COMMISSION RULES OF... Work Authorizations Early Partial Decisions on Site Suitability-Combined License Under 10 Cfr Part 52... complete and acceptable for docketing under § 2.101(a)(3), the Director of the Office of New Reactors or...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-22
... License Application for Bell Bend Nuclear Power Plant; Exemption 1.0 Background PPL Bell Bend, LLC... Regulations (10 CFR), Subpart C of Part 52, ``Licenses, Certifications, and Approvals for Nuclear Power Plants.'' This reactor is to be identified as Bell Bend Nuclear Power Plant (BBNPP), in Salem County...
NRC Licensing Status Summary Report for NGNP
DOE Office of Scientific and Technical Information (OSTI.GOV)
Moe, Wayne Leland; Kinsey, James Carl
2014-11-01
The Next Generation Nuclear Plant (NGNP) Project, initiated at Idaho National Laboratory (INL) by the U.S. Department of Energy (DOE) pursuant to provisions of the Energy Policy Act of 2005, is based on research and development activities supported by the Department of Energy Generation IV Nuclear Energy Systems Initiative. The principal objective of the NGNP Project is to support commercialization of high temperature gas-cooled reactor (HTGR) technology. The HTGR is a helium-cooled and graphite moderated reactor that can operate at temperatures much higher than those of conventional light water reactor (LWR) technologies. The NGNP will be licensed for construction andmore » operation by the Nuclear Regulatory Commission (NRC). However, not all elements of current regulations (and their related implementation guidance) can be applied to HTGR technology at this time. Certain policies established during past LWR licensing actions must be realigned to properly accommodate advanced HTGR technology. A strategy for licensing HTGR technology was developed and executed through the cooperative effort of DOE and the NRC through the NGNP Project. The purpose of this report is to provide a snapshot of the current status of the still evolving pre-license application regulatory framework relative to commercial HTGR technology deployment in the U.S. The following discussion focuses on (1) describing what has been accomplished by the NGNP Project up to the time of this report, and (2) providing observations and recommendations concerning actions that remain to be accomplished to enable the safe and timely licensing of a commercial HTGR facility in the U.S.« less
10 CFR 72.8 - Denial of licensing by Agreement States.
Code of Federal Regulations, 2010 CFR
2010-01-01
... SPENT NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C WASTE General... the storage of spent fuel and reactor-related GTCC waste in an ISFSI or the storage of spent fuel, high-level radioactive waste, and reactor-related GTCC waste in an MRS. [66 FR 51839, Oct. 11, 2001] ...
10 CFR 72.22 - Contents of application: General and financial information.
Code of Federal Regulations, 2011 CFR
2011-01-01
... INDEPENDENT STORAGE OF SPENT NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN... of spent fuel, high-level radioactive waste, and/or reactor-related GTCC waste from storage. (f) Each applicant for a license under this part to receive, transfer, and possess power reactor spent fuel, power...
10 CFR 52.141 - Referral to the Advisory Committee on Reactor Safeguards (ACRS).
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Referral to the Advisory Committee on Reactor Safeguards (ACRS). 52.141 Section 52.141 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS... Committee on Reactor Safeguards (ACRS). The Commission shall refer a copy of the application to the ACRS...
10 CFR 52.87 - Referral to the Advisory Committee on Reactor Safeguards (ACRS).
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 2 2011-01-01 2011-01-01 false Referral to the Advisory Committee on Reactor Safeguards (ACRS). 52.87 Section 52.87 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS... Reactor Safeguards (ACRS). The Commission shall refer a copy of the application to the ACRS. The ACRS...
10 CFR 52.53 - Referral to the Advisory Committee on Reactor Safeguards (ACRS).
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 2 2011-01-01 2011-01-01 false Referral to the Advisory Committee on Reactor Safeguards (ACRS). 52.53 Section 52.53 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS... Committee on Reactor Safeguards (ACRS). The Commission shall refer a copy of the application to the ACRS...
10 CFR 52.165 - Referral to the Advisory Committee on Reactor Safeguards (ACRS).
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Referral to the Advisory Committee on Reactor Safeguards (ACRS). 52.165 Section 52.165 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS... Committee on Reactor Safeguards (ACRS). The Commission shall refer a copy of the application to the ACRS...
10 CFR 52.23 - Referral to the Advisory Committee on Reactor Safeguards (ACRS).
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 2 2011-01-01 2011-01-01 false Referral to the Advisory Committee on Reactor Safeguards (ACRS). 52.23 Section 52.23 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS... on Reactor Safeguards (ACRS). The Commission shall refer a copy of the application for an early site...
10 CFR 52.165 - Referral to the Advisory Committee on Reactor Safeguards (ACRS).
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 2 2011-01-01 2011-01-01 false Referral to the Advisory Committee on Reactor Safeguards (ACRS). 52.165 Section 52.165 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS... Committee on Reactor Safeguards (ACRS). The Commission shall refer a copy of the application to the ACRS...
10 CFR 52.23 - Referral to the Advisory Committee on Reactor Safeguards (ACRS).
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Referral to the Advisory Committee on Reactor Safeguards (ACRS). 52.23 Section 52.23 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS... on Reactor Safeguards (ACRS). The Commission shall refer a copy of the application for an early site...
10 CFR 52.87 - Referral to the Advisory Committee on Reactor Safeguards (ACRS).
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Referral to the Advisory Committee on Reactor Safeguards (ACRS). 52.87 Section 52.87 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS... Reactor Safeguards (ACRS). The Commission shall refer a copy of the application to the ACRS. The ACRS...
10 CFR 52.141 - Referral to the Advisory Committee on Reactor Safeguards (ACRS).
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 2 2011-01-01 2011-01-01 false Referral to the Advisory Committee on Reactor Safeguards (ACRS). 52.141 Section 52.141 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS... Committee on Reactor Safeguards (ACRS). The Commission shall refer a copy of the application to the ACRS...
10 CFR 2.809 - Participation by the Advisory Committee on Reactor Safeguards.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 1 2011-01-01 2011-01-01 false Participation by the Advisory Committee on Reactor Safeguards. 2.809 Section 2.809 Energy NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING PROCEEDINGS AND ISSUANCE OF ORDERS Rulemaking § 2.809 Participation by the Advisory Committee on Reactor...
10 CFR 72.8 - Denial of licensing by Agreement States.
Code of Federal Regulations, 2011 CFR
2011-01-01
... SPENT NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C WASTE General... the storage of spent fuel and reactor-related GTCC waste in an ISFSI or the storage of spent fuel, high-level radioactive waste, and reactor-related GTCC waste in an MRS. [66 FR 51839, Oct. 11, 2001] ...
10 CFR 52.53 - Referral to the Advisory Committee on Reactor Safeguards (ACRS).
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Referral to the Advisory Committee on Reactor Safeguards (ACRS). 52.53 Section 52.53 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS... Committee on Reactor Safeguards (ACRS). The Commission shall refer a copy of the application to the ACRS...
76 FR 77021 - Notice of Availability of Combined License Applications
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-09
... searching on Docket ID NRC-2008-0170 (William States Lee III Nuclear Station Units 1 and 2), NRC-2008-0231...://www.nrc.gov/reactors/new-reactors/col.html . FOR FURTHER INFORMATION CONTACT: Donald Habib, Office of New Reactors, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, telephone: (301) 415-1035...
76 FR 71608 - Notice of Availability of Combined License Applications
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-18
... searching on Docket ID NRC-2008-0170 (William States Lee III Nuclear Station Units 1 and 2), NRC-2008-0231...://www.nrc.gov/reactors/new-reactors/col.html . FOR FURTHER INFORMATION CONTACT: Donald Habib, Office of New Reactors, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, telephone: (301) 415-1035...
76 FR 75566 - Notice of Availability of Combined License Applications
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-02
....regulations.gov by searching on Docket ID NRC-2008-0170 (William States Lee III Nuclear Station Units 1 and 2... available at http://www.nrc.gov/reactors/new-reactors/col.html . FOR FURTHER INFORMATION CONTACT: Donald Habib, Office of New Reactors, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, telephone...
76 FR 72725 - Notice of Availability of Combined License Applications
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-25
... searching on Docket ID NRC-2008-0170 (William States Lee III Nuclear Station Units 1 and 2), NRC-2008-0231...://www.nrc.gov/reactors/new-reactors/col.html . FOR FURTHER INFORMATION CONTACT: Donald Habib, Office of New Reactors, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, telephone: (301) 415-1035...
77 FR 42771 - License Renewal for the Dow Chemical TRIGA Research Reactor
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-20
... Chemical Company in Midland, MI and is a part of the Analytical Sciences Laboratory. The reactor is housed...-Radiological Impacts The Dow TRIGA Research Reactor core is cooled by a light water primary system consisting... provided by the volume of primary coolant allows several hours of full-power operation without any...
10 CFR 50.36a - Technical specifications on effluents from nuclear power reactors.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 1 2012-01-01 2012-01-01 false Technical specifications on effluents from nuclear power reactors. 50.36a Section 50.36a Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND...; Ineligibility of Certain Applicants § 50.36a Technical specifications on effluents from nuclear power reactors...
10 CFR 50.36a - Technical specifications on effluents from nuclear power reactors.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 1 2013-01-01 2013-01-01 false Technical specifications on effluents from nuclear power reactors. 50.36a Section 50.36a Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND...; Ineligibility of Certain Applicants § 50.36a Technical specifications on effluents from nuclear power reactors...
10 CFR 50.44 - Combustible gas control for nuclear power reactors.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 1 2014-01-01 2014-01-01 false Combustible gas control for nuclear power reactors. 50.44... FACILITIES Standards for Licenses, Certifications, and Regulatory Approvals § 50.44 Combustible gas control... capability for ensuring a mixed atmosphere. (2) Combustible gas control. (i) All boiling water reactors with...
10 CFR 50.44 - Combustible gas control for nuclear power reactors.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 1 2010-01-01 2010-01-01 false Combustible gas control for nuclear power reactors. 50.44... FACILITIES Standards for Licenses, Certifications, and Regulatory Approvals § 50.44 Combustible gas control... capability for ensuring a mixed atmosphere. (2) Combustible gas control. (i) All boiling water reactors with...
10 CFR 50.44 - Combustible gas control for nuclear power reactors.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 1 2012-01-01 2012-01-01 false Combustible gas control for nuclear power reactors. 50.44... FACILITIES Standards for Licenses, Certifications, and Regulatory Approvals § 50.44 Combustible gas control... capability for ensuring a mixed atmosphere. (2) Combustible gas control. (i) All boiling water reactors with...
Code of Federal Regulations, 2013 CFR
2013-01-01
... nuclear material, facility and operator licenses. (a) If the Director, Office of Nuclear Reactor... repository operations area under parts 60 or 63 of this chapter, the Director, Office of Nuclear Reactor Regulation, Director, Office of New Reactors, Director, Office of Nuclear Material Safety and Safeguards, or...
Code of Federal Regulations, 2010 CFR
2010-01-01
... those matters, the Commission, the Director, Office of Nuclear Reactor Regulation or Director, Office of... Nuclear Reactor Regulation, as appropriate, after making the requisite findings, will issue, deny or... acceptance criteria in nuclear power reactor combined licenses. In any initial decision under § 52.103(g) of...
10 CFR 50.63 - Loss of all alternating current power.
Code of Federal Regulations, 2014 CFR
2014-01-01
... information defined below to the Director of the Office of Nuclear Reactor Regulation by April 17, 1989. For... Office of Nuclear Reactor Regulation, by 270 days after the date of license issuance. For each light... accordance with paragraph (c)(3) of this section, submit to the Director of the Office of Nuclear Reactor...
Code of Federal Regulations, 2011 CFR
2011-01-01
... those matters, the Commission, the Director, Office of Nuclear Reactor Regulation or Director, Office of... Nuclear Reactor Regulation, as appropriate, after making the requisite findings, will issue, deny or... acceptance criteria in nuclear power reactor combined licenses. In any initial decision under § 52.103(g) of...
10 CFR 140.52 - Indemnity agreements.
Code of Federal Regulations, 2014 CFR
2014-01-01
...) authorizing the licensee to operate the nuclear reactor involved; or (2) The effective date of the license... material at the site of the nuclear reactor for use as fuel in operation of the nuclear reactor after... 10 Energy 2 2014-01-01 2014-01-01 false Indemnity agreements. 140.52 Section 140.52 Energy NUCLEAR...
10 CFR 50.63 - Loss of all alternating current power.
Code of Federal Regulations, 2012 CFR
2012-01-01
... information defined below to the Director of the Office of Nuclear Reactor Regulation by April 17, 1989. For... Office of Nuclear Reactor Regulation, by 270 days after the date of license issuance. For each light... accordance with paragraph (c)(3) of this section, submit to the Director of the Office of Nuclear Reactor...
75 FR 42469 - Firstenergy Nuclear Operating Company; Request for Licensing Action
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-21
... nuclear plant in Ohio, preventing the reactor from restarting until such time that the NRC determines... Commission's regulations. The request has been referred to the Director of the Office of Nuclear Reactor... of Nuclear Reactor Regulation. [FR Doc. 2010-17834 Filed 7-20-10; 8:45 am] BILLING CODE 7590-01-P ...
Code of Federal Regulations, 2014 CFR
2014-01-01
... nuclear material, facility and operator licenses. (a) If the Director, Office of Nuclear Reactor... repository operations area under parts 60 or 63 of this chapter, the Director, Office of Nuclear Reactor Regulation, Director, Office of New Reactors, Director, Office of Nuclear Material Safety and Safeguards, or...
10 CFR 50.63 - Loss of all alternating current power.
Code of Federal Regulations, 2013 CFR
2013-01-01
... information defined below to the Director of the Office of Nuclear Reactor Regulation by April 17, 1989. For... Office of Nuclear Reactor Regulation, by 270 days after the date of license issuance. For each light... accordance with paragraph (c)(3) of this section, submit to the Director of the Office of Nuclear Reactor...
10 CFR 140.52 - Indemnity agreements.
Code of Federal Regulations, 2010 CFR
2010-01-01
...) authorizing the licensee to operate the nuclear reactor involved; or (2) The effective date of the license... material at the site of the nuclear reactor for use as fuel in operation of the nuclear reactor after... 10 Energy 2 2010-01-01 2010-01-01 false Indemnity agreements. 140.52 Section 140.52 Energy NUCLEAR...
Code of Federal Regulations, 2012 CFR
2012-01-01
... those matters, the Commission, the Director, Office of Nuclear Reactor Regulation or Director, Office of... Nuclear Reactor Regulation, as appropriate, after making the requisite findings, will issue, deny or... acceptance criteria in nuclear power reactor combined licenses. In any initial decision under § 52.103(g) of...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-02
..., Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001..., Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation. [FR Doc. 2011-4557 Filed 3-1... NUCLEAR REGULATORY COMMISSION [Docket No. 50-282; NRC-2011-0040] Prairie Island Nuclear Generating...
10 CFR 50.63 - Loss of all alternating current power.
Code of Federal Regulations, 2011 CFR
2011-01-01
... information defined below to the Director of the Office of Nuclear Reactor Regulation by April 17, 1989. For... Office of Nuclear Reactor Regulation, by 270 days after the date of license issuance. For each light... accordance with paragraph (c)(3) of this section, submit to the Director of the Office of Nuclear Reactor...
77 FR 14445 - Application for a License To Export Steel Forging
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-09
...) 415-1677, to request a digital ID certificate and allow for the creation of an electronic docket. In...Energy Nuclear Operating Co Reactor vessel One The reactor vessel Spain. December 15, 2011 head steel...
10 CFR 73.60 - Additional requirements for physical protection at nonpower reactors.
Code of Federal Regulations, 2012 CFR
2012-01-01
... nonpower reactors licensed to operate at or above a power level of 2 megawatts thermal. [38 FR 35430, Dec... OF PLANTS AND MATERIALS Physical Protection Requirements at Fixed Sites § 73.60 Additional...
10 CFR 73.60 - Additional requirements for physical protection at nonpower reactors.
Code of Federal Regulations, 2013 CFR
2013-01-01
... nonpower reactors licensed to operate at or above a power level of 2 megawatts thermal. [38 FR 35430, Dec... OF PLANTS AND MATERIALS Physical Protection Requirements at Fixed Sites § 73.60 Additional...
10 CFR 73.60 - Additional requirements for physical protection at nonpower reactors.
Code of Federal Regulations, 2014 CFR
2014-01-01
... nonpower reactors licensed to operate at or above a power level of 2 megawatts thermal. [38 FR 35430, Dec... OF PLANTS AND MATERIALS Physical Protection Requirements at Fixed Sites § 73.60 Additional...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-04
... renewed Facility Operating License No. R-37, to be held by the Massachusetts Institute of Technology (MIT... Identification of the Proposed Action The proposed action would renew Facility Operating License No. R-37 for a... License No. R-37 to allow continued operation of the MITR for a period of twenty years at an increased...
Code of Federal Regulations, 2010 CFR
2010-01-01
... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... FACILITIES Pt. 50, App.N Appendix N to Part 50—Standardization of Nuclear Power Plant Designs: Permits To..., apply to construction permits and operating licenses subject to this appendix N. 2. Applications for...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Grabaskas, David; Bucknor, Matthew; Jerden, James
A mechanistic source term (MST) calculation attempts to realistically assess the transport and release of radionuclides from a reactor system to the environment during a specific accident sequence. The U.S. Nuclear Regulatory Commission (NRC) has repeatedly stated its expectation that advanced reactor vendors will utilize an MST during the U.S. reactor licensing process. As part of a project to examine possible impediments to sodium fast reactor (SFR) licensing in the U.S., an analysis was conducted regarding the current capabilities to perform an MST for a metal fuel SFR. The purpose of the project was to identify and prioritize any gapsmore » in current computational tools, and the associated database, for the accurate assessment of an MST. The results of the study demonstrate that an SFR MST is possible with current tools and data, but several gaps exist that may lead to possibly unacceptable levels of uncertainty, depending on the goals of the MST analysis.« less
Health physics aspects of advanced reactor licensing reviews
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hinson, C.S.
1995-03-01
The last Construction Permit to be issued by the U.S. Nuclear Regulatory Commission (NRC) for a U.S. light water reactor (LWR) was granted in the late 1970s. In 1989 the NRC issued 10 CFR Part 52 which is intended to serve as a framework for the licensing of future reactor designs. The NRC is currently reviewing four different future on {open_quotes}next-generation{close_quotes} reactor designs. Two of these designs are classified as evolutionary designs (modified versions of current generation LWRs) and two are advanced designs (reactors incorporating simplified designs and passive means for accident mitigation). These {open_quotes}next-generation{close_quotes} reactor designs incorporate many innovativemore » design features which are intended to maintain personnel doses ALARA and ensure that the annual average collective dose at these reactors does not exceed 100 person-rems (1 person-sievert) per year. This paper discusses some of the ALARA design features which are incorporated in the four {open_quotes}next-generation{close_quotes} reactor designs incorporate many innovative design features which are intended to maintain personnel doses ALARA and ensure that the annual average collective dose at these reactors does not exceed 100 person-rems (1 person-sievert) per year. This paper discusses some of the ALARA design features which are incorporated in the four {open_quotes}next-generation{close_quotes} reactor designs currently being reviewed by the NRC.« less
A Research Reactor Concept to Support NTP Development
NASA Technical Reports Server (NTRS)
Eades, Michael J.; Blue, T. E.; Gerrish, Harold P.; Hardin, Leroy A.
2014-01-01
In support of efforts for research into the design and development of man rated Nuclear Thermal Propulsion (NTP), the National Aeronautics and Space Administration (NASA), Marshall Space Flight Center (MSFC), is evaluating the potential for building a Nuclear Regulatory Commission (NRC) licensed NTP based research reactor (NTPRR). The proposed NTPRR would be licensed by NASA and operated jointly by NASA and university partners. The purpose of the NTPRR would be used to perform further research into the technologies and systems needed for a successful NTP project and promote nuclear training and education.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-11
... interval extension is bounded by the 15 year ILRT Interval currently authorized within NEI [Nuclear Energy... following benefits: (1) Allows the plant to reach the all-rods-in condition prior to significant reactor...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-08
... NUCLEAR REGULATORY COMMISSION [Docket No. 50-407, NRC-2011-0153] University of Utah, University of Utah TRIGA Nuclear Reactor, Notice of Issuance of Renewed Facility Operating License No. R-126 AGENCY... University of Utah (UU, the licensee), which authorizes continued operation of the UU TRIGA Nuclear Reactor...
Code of Federal Regulations, 2012 CFR
2012-01-01
..., systems and components for nuclear power reactors. 50.69 Section 50.69 Energy NUCLEAR REGULATORY..., systems and components for nuclear power reactors. (a) Definitions. Risk-Informed Safety Class (RISC)-1... holder of a license to operate a light water reactor (LWR) nuclear power plant under this part; a holder...
Code of Federal Regulations, 2013 CFR
2013-01-01
..., systems and components for nuclear power reactors. 50.69 Section 50.69 Energy NUCLEAR REGULATORY..., systems and components for nuclear power reactors. (a) Definitions. Risk-Informed Safety Class (RISC)-1... holder of a license to operate a light water reactor (LWR) nuclear power plant under this part; a holder...
Code of Federal Regulations, 2014 CFR
2014-01-01
..., systems and components for nuclear power reactors. 50.69 Section 50.69 Energy NUCLEAR REGULATORY..., systems and components for nuclear power reactors. (a) Definitions. Risk-Informed Safety Class (RISC)-1... holder of a license to operate a light water reactor (LWR) nuclear power plant under this part; a holder...
10 CFR 72.214 - List of approved spent fuel storage casks.
Code of Federal Regulations, 2010 CFR
2010-01-01
... STORAGE OF SPENT NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C WASTE General License for Storage of Spent Fuel at Power Reactor Sites § 72.214 List of approved spent...
10 CFR 72.214 - List of approved spent fuel storage casks.
Code of Federal Regulations, 2011 CFR
2011-01-01
... STORAGE OF SPENT NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C WASTE General License for Storage of Spent Fuel at Power Reactor Sites § 72.214 List of approved spent...
NASA Astrophysics Data System (ADS)
Lee, Gong Hee; Bang, Young Seok; Woo, Sweng Woong; Kim, Do Hyeong; Kang, Min Ku
2014-06-01
As the computer hardware technology develops the license applicants for nuclear power plant use the commercial CFD software with the aim of reducing the excessive conservatism associated with using simplified and conservative analysis tools. Even if some of CFD software developer and its user think that a state of the art CFD software can be used to solve reasonably at least the single-phase nuclear reactor problems, there is still limitation and uncertainty in the calculation result. From a regulatory perspective, Korea Institute of Nuclear Safety (KINS) is presently conducting the performance assessment of the commercial CFD software for nuclear reactor problems. In this study, in order to examine the validity of the results of 1/5 scaled APR+ (Advanced Power Reactor Plus) flow distribution tests and the applicability of CFD in the analysis of reactor internal flow, the simulation was conducted with the two commercial CFD software (ANSYS CFX V.14 and FLUENT V.14) among the numerous commercial CFD software and was compared with the measurement. In addition, what needs to be improved in CFD for the accurate simulation of reactor core inlet flow was discussed.
AGR-1 Compact 1-3-1 Post-Irradiation Examination Results
DOE Office of Scientific and Technical Information (OSTI.GOV)
Demkowicz, Paul Andrew
The Advanced Gas Reactor (AGR) Fuel Development and Qualification Program was established to perform the requisite research and development on tristructural isotropic (TRISO) coated particle fuel to support deployment of a high-temperature gas-cooled reactor (HTGR). The work continues as part of the Advanced Reactor Technologies (ART) TRISO Fuel program. The overarching program goal is to provide a baseline fuel qualification data set to support licensing and operation of an HTGR. To achieve these goals, the program includes the elements of fuel fabrication, irradiation, post-irradiation examination (PIE) and safety testing, fuel performance modeling, and fission product transport (INL 2015). A seriesmore » of fuel irradiation experiments is being planned and conducted in the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL). These experiments will provide data on fuel performance under irradiation, support fuel process development, qualify the fuel for normal operating conditions, provide irradiated fuel for safety testing, and support the development of fuel performance and fission product transport models. The first of these irradiation tests, designated AGR-1, began in the ATR in December 2006 and ended in November 2009. This experiment was conducted primarily to act as a shakedown test of the multicapsule test train design and provide early data on fuel performance for use in fuel fabrication process development. It also provided samples for post-irradiation safety testing, where fission product retention of the fuel at high temperatures will be experimentally measured. The capsule design and details of the AGR-1 experiment have been presented previously (Grover, Petti, and Maki 2010, Maki 2009).« less
AGR-1 Compact 5-3-1 Post-Irradiation Examination Results
DOE Office of Scientific and Technical Information (OSTI.GOV)
Demkowicz, Paul; Harp, Jason; Winston, Phil
The Advanced Gas Reactor (AGR) Fuel Development and Qualification Program was established to perform the requisite research and development on tristructural isotropic (TRISO) coated particle fuel to support deployment of a high-temperature gas-cooled reactor (HTGR). The work continues as part of the Advanced Reactor Technologies (ART) TRISO Fuel program. The overarching program goal is to provide a baseline fuel qualification data set to support licensing and operation of an HTGR. To achieve these goals, the program includes the elements of fuel fabrication, irradiation, post-irradiation examination (PIE) and safety testing, fuel performance, and fission product transport (INL 2015). A series ofmore » fuel irradiation experiments is being planned and conducted in the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL). These experiments will provide data on fuel performance under irradiation, support fuel process development, qualify the fuel for normal operating conditions, provide irradiated fuel for safety testing, and support the development of fuel performance and fission product transport models. The first of these irradiation tests, designated AGR-1, began in the ATR in December 2006 and ended in November 2009. This experiment was conducted primarily to act as a shakedown test of the multicapsule test train design and provide early data on fuel performance for use in fuel fabrication process development. It also provided samples for post-irradiation safety testing, where fission product retention of the fuel at high temperatures will be experimentally measured. The capsule design and details of the AGR-1 experiment have been presented previously.« less
Code of Federal Regulations, 2010 CFR
2010-01-01
... pursuant to appendix N of part 50 of this chapter for construction permits for nuclear power reactors of... Procedures Applicable to Proceedings for the Issuance of Licenses To Construct and/or Operate Nuclear Power... license applications pursuant to appendix N of 10 CFR parts 50 or 52. 2.401 Section 2.401 Energy NUCLEAR...
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 2 2013-01-01 2013-01-01 false Standardization of Nuclear Power Plant Designs: Combined Licenses To Construct and Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N to Part 52 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS Pt. 52, App. N...
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 2 2014-01-01 2014-01-01 false Standardization of Nuclear Power Plant Designs: Combined Licenses To Construct and Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N to Part 52 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS Pt. 52, App. N...
10 CFR 51.121 - Status of NEPA actions.
Code of Federal Regulations, 2012 CFR
2012-01-01
... address inquiries to: (a) Utilization facilities: ATTN: Document Control Desk, Director, Office of Nuclear Reactor Regulation or Director, Office of New Reactors, as appropriate, U.S. Nuclear Regulatory Commission... NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND...
10 CFR 51.121 - Status of NEPA actions.
Code of Federal Regulations, 2014 CFR
2014-01-01
... address inquiries to: (a) Utilization facilities: ATTN: Document Control Desk, Director, Office of Nuclear Reactor Regulation or Director, Office of New Reactors, as appropriate, U.S. Nuclear Regulatory Commission... NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND...
10 CFR 51.121 - Status of NEPA actions.
Code of Federal Regulations, 2013 CFR
2013-01-01
... address inquiries to: (a) Utilization facilities: ATTN: Document Control Desk, Director, Office of Nuclear Reactor Regulation or Director, Office of New Reactors, as appropriate, U.S. Nuclear Regulatory Commission... NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Erika Bailey
2011-10-27
The Enrico Fermi Atomic Power Plant, Unit 1 (Fermi 1) was a fast breeder reactor design that was cooled by sodium and operated at essentially atmospheric pressure. On May 10, 1963, the Atomic Energy Commission (AEC) granted an operating license, DPR-9, to the Power Reactor Development Company (PRDC), a consortium specifically formed to own and operate a nuclear reactor at the Fermi 1 site. The reactor was designed for a maximum capability of 430 megawatts (MW); however, the maximum reactor power with the first core loading (Core A) was 200 MW. The primary system was filled with sodium in Decembermore » 1960 and criticality was achieved in August 1963. The reactor was tested at low power during the first couple years of operation. Power ascension testing above 1 MW commenced in December 1965 immediately following the receipt of a high-power operating license. In October 1966 during power ascension, zirconium plates at the bottom of the reactor vessel became loose and blocked sodium coolant flow to some fuel subassemblies. Two subassemblies started to melt and the reactor was manually shut down. No abnormal releases to the environment occurred. Forty-two months later after the cause had been determined, cleanup completed, and the fuel replaced, Fermi 1 was restarted. However, in November 1972, PRDC made the decision to decommission Fermi 1 as the core was approaching its burn-up limit. The fuel and blanket subassemblies were shipped off-site in 1973. Following that, the secondary sodium system was drained and sent off-site. The radioactive primary sodium was stored on-site in storage tanks and 55 gallon (gal) drums until it was shipped off-site in 1984. The initial decommissioning of Fermi 1 was completed in 1975. Effective January 23, 1976, DPR-9 was transferred to the Detroit Edison Company (DTE) as a 'possession only' license (DTE 2010a). This report details the confirmatory activities performed during the second Oak Ridge Institute for Science and Education (ORISE) site visit to Fermi 1 in November 2010. The survey was strategically planned during a Unit 2 (Fermi 2) outage to take advantage of decreased radiation levels that were observed and attributed to Fermi 2 from the operating unit during the first site visit. However, during the second visit there were elevated radiation levels observed and attributed to the partially dismantled Fermi 1 reactor vessel and a waste storage box located on the 3rd floor of the Fermi 1 Turbine Building. Confirmatory surveys (unshielded) performed directly in the line of sight of these areas were affected. The objective of the confirmatory survey was to verify that the final radiological conditions were accurately and adequately described in Final Status Survey (FSS) documentation, relative to the established release criteria. This objective was achieved by performing document reviews, as well as independent measurements and sampling. Specifically, documentation of the planning, implementation, and results of the FSS were evaluated; side-by-side FSS measurement and source comparisons were performed; site areas were evaluated relative to appropriate FSS classification; and areas were assessed for residual, undocumented contamination.« less
10 CFR 72.18 - Elimination of repetition.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 2 2011-01-01 2011-01-01 false Elimination of repetition. 72.18 Section 72.18 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR THE INDEPENDENT STORAGE OF SPENT NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C WASTE License...
10 CFR 72.18 - Elimination of repetition.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Elimination of repetition. 72.18 Section 72.18 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR THE INDEPENDENT STORAGE OF SPENT NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C WASTE License...
10 CFR 72.34 - Environmental report.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Environmental report. 72.34 Section 72.34 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR THE INDEPENDENT STORAGE OF SPENT NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C WASTE License Application, Form...
10 CFR 52.151 - Scope of subpart.
Code of Federal Regulations, 2010 CFR
2010-01-01
... applicable to Commission issuance of a license authorizing manufacture of nuclear power reactors to be... 10 Energy 2 2010-01-01 2010-01-01 false Scope of subpart. 52.151 Section 52.151 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS...
10 CFR 2.105 - Notice of proposed action.
Code of Federal Regulations, 2011 CFR
2011-01-01
... NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING PROCEEDINGS AND ISSUANCE OF ORDERS Procedure for Issuance, Amendment, Transfer, or Renewal of a License, and Standard Design Approval Hearing... within the time prescribed in the notice, the Director, Office of Nuclear Reactor Regulation, Director...
10 CFR 2.105 - Notice of proposed action.
Code of Federal Regulations, 2010 CFR
2010-01-01
... NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING PROCEEDINGS AND ISSUANCE OF ORDERS Procedure for Issuance, Amendment, Transfer, or Renewal of a License, and Standard Design Approval Hearing... within the time prescribed in the notice, the Director, Office of Nuclear Reactor Regulation, Director...
Reactor safeguards system assessment and design. Volume I
DOE Office of Scientific and Technical Information (OSTI.GOV)
Varnado, G.B.; Ericson, D.M. Jr.; Daniel, S.L.
1978-06-01
This report describes the development and application of a methodology for evaluating the effectiveness of nuclear power reactor safeguards systems. Analytic techniques are used to identify the sabotage acts which could lead to release of radioactive material from a nuclear power plant, to determine the areas of a plant which must be protected to assure that significant release does not occur, to model the physical plant layout, and to evaluate the effectiveness of various safeguards systems. The methodology was used to identify those aspects of reactor safeguards systems which have the greatest effect on overall system performance and which, therefore,more » should be emphasized in the licensing process. With further refinements, the methodology can be used by the licensing reviewer to aid in assessing proposed or existing safeguards systems.« less
AGC 2 Irradiated Material Properties Analysis
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rohrbaugh, David Thomas
2017-05-01
The Advanced Reactor Technologies Graphite Research and Development Program is conducting an extensive graphite irradiation experiment to provide data for licensing of a high temperature reactor (HTR) design. In past applications, graphite has been used effectively as a structural and moderator material in both research and commercial high temperature gas cooled reactor designs. , Nuclear graphite H 451, used previously in the United States for nuclear reactor graphite components, is no longer available. New nuclear graphite grades have been developed and are considered suitable candidates for new HTR reactor designs. To support the design and licensing of HTR core componentsmore » within a commercial reactor, a complete properties database must be developed for these current grades of graphite. Quantitative data on in service material performance are required for the physical, mechanical, and thermal properties of each graphite grade, with a specific emphasis on data accounting for the life limiting effects of irradiation creep on key physical properties of the HTR candidate graphite grades. Further details on the research and development activities and associated rationale required to qualify nuclear grade graphite for use within the HTR are documented in the graphite technology research and development plan.« less
AGC 2 Irradiation Creep Strain Data Analysis
DOE Office of Scientific and Technical Information (OSTI.GOV)
Windes, William E.; Rohrbaugh, David T.; Swank, W. David
2016-08-01
The Advanced Reactor Technologies Graphite Research and Development Program is conducting an extensive graphite irradiation experiment to provide data for licensing of a high temperature reactor (HTR) design. In past applications, graphite has been used effectively as a structural and moderator material in both research and commercial high temperature gas cooled reactor designs. Nuclear graphite H-451, used previously in the United States for nuclear reactor graphite components, is no longer available. New nuclear graphite grades have been developed and are considered suitable candidates for new HTR reactor designs. To support the design and licensing of HTR core components within amore » commercial reactor, a complete properties database must be developed for these current grades of graphite. Quantitative data on in service material performance are required for the physical, mechanical, and thermal properties of each graphite grade, with a specific emphasis on data accounting for the life limiting effects of irradiation creep on key physical properties of the HTR candidate graphite grades. Further details on the research and development activities and associated rationale required to qualify nuclear grade graphite for use within the HTR are documented in the graphite technology research and development plan.« less
Licensed operating reactors: Status summary report, data as of December 31, 1995. Volume 20
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-06-01
The US Nuclear Regulatory Commission`s monthly summary of licensed nuclear power reactor data is based primarily on the operating data report submitted by licensees for each unit. This report is divided into two sections: the first contains summary highlights and the second contains data on each individual unit in commercial operation. Section 1 availability factors, capacity factors, and forced outage rates are simple arithmetic averages. Section 2 items in the cumulative column are generally as reported by the licensees and notes to the use of weighted averages and starting dates other than commercial operation are provided.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 1 2014-01-01 2014-01-01 false Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N to Part 50 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Pt. 50, App. N Appendix N to Par...
10 CFR 72.20 - Public inspection of application.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 2 2011-01-01 2011-01-01 false Public inspection of application. 72.20 Section 72.20 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR THE INDEPENDENT STORAGE OF SPENT NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C WASTE License...
10 CFR 72.20 - Public inspection of application.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Public inspection of application. 72.20 Section 72.20 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR THE INDEPENDENT STORAGE OF SPENT NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C WASTE License...
10 CFR 2.310 - Selection of hearing procedures.
Code of Federal Regulations, 2010 CFR
2010-01-01
..., licensee-initiated amendment, or termination of licenses or permits for nuclear power reactors, where the... of a civilian nuclear power plant must be conducted under the procedures of subpart L of this part... Energy NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING PROCEEDINGS AND ISSUANCE OF...
10 CFR 52.153 - Relationship to other subparts.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 2 2011-01-01 2011-01-01 false Relationship to other subparts. 52.153 Section 52.153 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS Manufacturing Licenses § 52.153 Relationship to other subparts. (a) A nuclear power reactor...
10 CFR 52.153 - Relationship to other subparts.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Relationship to other subparts. 52.153 Section 52.153 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS Manufacturing Licenses § 52.153 Relationship to other subparts. (a) A nuclear power reactor...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-06
..., alpha plus beta measurements, smear sampling, and soil sampling activities. As a result of the...-Agency Radiation Survey and Site Investigation Manual.'' The U of AZ submitted a revised FSS Plan on... and that the [[Page 13377
10 CFR 50.10 - License required; limited work authorization.
Code of Federal Regulations, 2011 CFR
2011-01-01
... the land for public recreational purposes; (ii) Site exploration, including necessary borings to... building with space for installation of a training reactor). (b) Requirement for license. Except as... applicant and, except as to the matters determined under paragraph (e)(1) of this section, the issuance of...
10 CFR 50.10 - License required; limited work authorization.
Code of Federal Regulations, 2013 CFR
2013-01-01
... the land for public recreational purposes; (ii) Site exploration, including necessary borings to... building with space for installation of a training reactor). (b) Requirement for license. Except as... applicant and, except as to the matters determined under paragraph (e)(1) of this section, the issuance of...
10 CFR 50.10 - License required; limited work authorization.
Code of Federal Regulations, 2014 CFR
2014-01-01
... the land for public recreational purposes; (ii) Site exploration, including necessary borings to... building with space for installation of a training reactor). (b) Requirement for license. Except as... applicant and, except as to the matters determined under paragraph (e)(1) of this section, the issuance of...
10 CFR 50.10 - License required; limited work authorization.
Code of Federal Regulations, 2012 CFR
2012-01-01
... the land for public recreational purposes; (ii) Site exploration, including necessary borings to... building with space for installation of a training reactor). (b) Requirement for license. Except as... applicant and, except as to the matters determined under paragraph (e)(1) of this section, the issuance of...
10 CFR 50.57 - Issuance of operating license. 1
Code of Federal Regulations, 2011 CFR
2011-01-01
... contested activity sought to be authorized. The Director of Nuclear Reactor Regulation will make findings on... Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Issuance... presiding officer will issue an order in accordance with § 2.319(p) authorizing the Director of Nuclear...
10 CFR 50.57 - Issuance of operating license. 1
Code of Federal Regulations, 2014 CFR
2014-01-01
... contested activity sought to be authorized. The Director of Nuclear Reactor Regulation will make findings on... Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Issuance... presiding officer will issue an order in accordance with § 2.319(p) authorizing the Director of Nuclear...
10 CFR 50.57 - Issuance of operating license. 1
Code of Federal Regulations, 2013 CFR
2013-01-01
... contested activity sought to be authorized. The Director of Nuclear Reactor Regulation will make findings on... Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Issuance... presiding officer will issue an order in accordance with § 2.319(p) authorizing the Director of Nuclear...
10 CFR 50.57 - Issuance of operating license. 1
Code of Federal Regulations, 2012 CFR
2012-01-01
... contested activity sought to be authorized. The Director of Nuclear Reactor Regulation will make findings on... Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Issuance... presiding officer will issue an order in accordance with § 2.319(p) authorizing the Director of Nuclear...
10 CFR 50.57 - Issuance of operating license. 1
Code of Federal Regulations, 2010 CFR
2010-01-01
... contested activity sought to be authorized. The Director of Nuclear Reactor Regulation will make findings on... Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Issuance... presiding officer will issue an order in accordance with § 2.319(p) authorizing the Director of Nuclear...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-25
... Reactor (U.S. EPR) will hold a meeting on May 8-9, 2013, Room T-2B1, 11545 Rockville Pike, Rockville... License Application (COLA) associated with the U.S. EPR Design Control Document (DCD). The Subcommittee...
10 CFR 52.131 - Scope of subpart.
Code of Federal Regulations, 2010 CFR
2010-01-01
... REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS Standard... review, and referral to the Advisory Committee on Reactor Safeguards of standard designs for a nuclear power reactor of the type described in § 50.22 of this chapter or major portions thereof. ...
10 CFR 52.75 - Filing of applications.
Code of Federal Regulations, 2014 CFR
2014-01-01
... New Reactors or Director, Office of Nuclear Reactor Regulation, as appropriate. (b) The application... 10 Energy 2 2014-01-01 2014-01-01 false Filing of applications. 52.75 Section 52.75 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS Combined...
10 CFR 2.102 - Administrative review of application.
Code of Federal Regulations, 2011 CFR
2011-01-01
... completion of its review. (b) The Director, Office of Nuclear Reactor Regulation, Director, Office of New... as requested by the Commission. (c) The Director, Office of Nuclear Reactor Regulation, Director... Energy NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING PROCEEDINGS AND ISSUANCE OF...
10 CFR 52.75 - Filing of applications.
Code of Federal Regulations, 2011 CFR
2011-01-01
... New Reactors or Director, Office of Nuclear Reactor Regulation, as appropriate. (b) The application... 10 Energy 2 2011-01-01 2011-01-01 false Filing of applications. 52.75 Section 52.75 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS Combined...
10 CFR 52.75 - Filing of applications.
Code of Federal Regulations, 2012 CFR
2012-01-01
... New Reactors or Director, Office of Nuclear Reactor Regulation, as appropriate. (b) The application... 10 Energy 2 2012-01-01 2012-01-01 false Filing of applications. 52.75 Section 52.75 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS Combined...
10 CFR 2.102 - Administrative review of application.
Code of Federal Regulations, 2012 CFR
2012-01-01
... completion of its review. (b) The Director, Office of Nuclear Reactor Regulation, Director, Office of New... as requested by the Commission. (c) The Director, Office of Nuclear Reactor Regulation, Director... Energy NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING PROCEEDINGS AND ISSUANCE OF...
10 CFR 52.75 - Filing of applications.
Code of Federal Regulations, 2010 CFR
2010-01-01
... New Reactors or Director, Office of Nuclear Reactor Regulation, as appropriate. (b) The application... 10 Energy 2 2010-01-01 2010-01-01 false Filing of applications. 52.75 Section 52.75 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS Combined...
10 CFR 52.75 - Filing of applications.
Code of Federal Regulations, 2013 CFR
2013-01-01
... New Reactors or Director, Office of Nuclear Reactor Regulation, as appropriate. (b) The application... 10 Energy 2 2013-01-01 2013-01-01 false Filing of applications. 52.75 Section 52.75 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS Combined...
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Backfitting. 72.62 Section 72.62 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR THE INDEPENDENT STORAGE OF SPENT NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C WASTE Issuance and Conditions of License § 72.62...
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false [Reserved] 72.216 Section 72.216 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR THE INDEPENDENT STORAGE OF SPENT NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C WASTE General License for Storage of Spent Fuel at...
10 CFR 2.502-2.504 - [Reserved
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 1 2010-01-01 2010-01-01 false [Reserved] 2.502-2.504 Section 2.502-2.504 Energy NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING PROCEEDINGS AND ISSUANCE OF ORDERS Additional Procedures Applicable to Proceedings for the Issuance of Licenses To Manufacture Nuclear Power Reactors To Be...
10 CFR 50.76 - Licensee's change of status; financial qualifications.
Code of Federal Regulations, 2010 CFR
2010-01-01
... license) for a nuclear power reactor, no later than seventy-five (75) days prior to ceasing to be an... 10 Energy 1 2010-01-01 2010-01-01 false Licensee's change of status; financial qualifications. 50.76 Section 50.76 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND...
10 CFR 51.53 - Postconstruction environmental reports.
Code of Federal Regulations, 2014 CFR
2014-01-01
... renewal of a license to operate a nuclear power plant under part 54 of this chapter shall submit with its... for a nuclear power reactor shall submit this report only in connection with the first licensing action authorizing full-power operation. In this report, the applicant shall discuss the same matters...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-16
... PWR [Pressurized-Water Reactor] Steam Generator Tubes'' (Reference 32) and [Nuclear Energy Institute... maintains the required structural margins of the SG tubes for both normal and accident conditions. Nuclear Energy Institute 97-06, ``Steam Generator Program Guidelines'' (Reference 8), and NRC Regulatory Guide 1...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-20
... upgraded licenses or license renewals to operate the controls at a nuclear reactor facility. This... NUCLEAR REGULATORY COMMISSION [Docket No. NRC-2012-0184] Agency Information Collection Activities: Submission for the Office of Management and Budget (OMB) Review; Comment Request AGENCY: Nuclear Regulatory...
Atomic Safety and Licensing Board Panel Biennial Report, Fiscal Years 1993--1994. Volume 6
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-08-01
In Fiscal Year 1993, the Atomic Safety and Licensing Board Panel (``the Panel``) handled 30 proceedings. In Fiscal Year 1994, the Panel handled 36 proceedings. The cases addressed issues in the construction, operation, and maintenance of commercial nuclear power reactors and other activities requiring a license form the Nuclear Regulatory Commission. This report sets out the Panel`s caseload during the year and summarizes, highlight, and analyzes how the wide- ranging issues raised in those proceedings were addressed by the Panel`s judges and licensing boards.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-29
... Detection Instrumentation,'' to define a new time limit for restoring inoperable RCS leakage detection... Specifications Section 3.4.15 regarding reactor coolant leakage detection instrumentation to be consistent with... amendments revised the Technical Specifications (TSs) ``RCS [reactor coolant system] Leakage Detection...
10 CFR 2.107 - Withdrawal of application.
Code of Federal Regulations, 2011 CFR
2011-01-01
..., Office of Nuclear Reactor Regulation, Director, Office of New Reactors, or Director, Office of Nuclear... 10 Energy 1 2011-01-01 2011-01-01 false Withdrawal of application. 2.107 Section 2.107 Energy NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING PROCEEDINGS AND ISSUANCE OF ORDERS...
10 CFR 2.107 - Withdrawal of application.
Code of Federal Regulations, 2012 CFR
2012-01-01
..., Office of Nuclear Reactor Regulation, Director, Office of New Reactors, or Director, Office of Nuclear... 10 Energy 1 2012-01-01 2012-01-01 false Withdrawal of application. 2.107 Section 2.107 Energy NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING PROCEEDINGS AND ISSUANCE OF ORDERS...
1980-08-01
metal fast breeder reactor (LMFBR) design. It also re-examines the impact of the accident at Three Mile Island on the design basis concept, and how...Water Reactors : ImpZications for Liquid MetaZ Fast Breeder Reactors , by W. E. Kastenberg and K. A. Solomon, July 1979. v SUNMARY The 1979 accident...the liquid metal fast breeder reactor (LMFBR). This Note assesses the impact of the TMI-2 accident on the LMFBR. Specifically, it: o Reviews the
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-20
... NUCLEAR REGULATORY COMMISSION [NRC-2012-0010] Knowledge and Abilities Catalog for Nuclear Power... comment a draft NUREG, NUREG-2104, Revision 0, ``Knowledge and Abilities Catalog for Nuclear Power Plant... developed using this Catalog along with the Operator Licensing Examination Standards for Power Reactors...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-08
... NUCLEAR REGULATORY COMMISSION [Docket No. 50-020; NRC-2010-0313] Massachusetts Institute of Technology Reactor Notice of Issuance of Renewed Facility Operating; License No. R-37 The U.S. Nuclear... Institute of Technology (the licensee), which authorizes continued operation of the Massachusetts Institute...
10 CFR 50.82 - Termination of license.
Code of Federal Regulations, 2011 CFR
2011-01-01
... to the NRC, consistent with the requirements of § 50.4(b)(8); (ii) Once fuel has been permanently... fuel from the reactor vessel, or when a final legally effective order to permanently cease operations... emplacement or retention of fuel into the reactor vessel. (3) Decommissioning will be completed within 60...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-25
... Nearby Facilities and on Transportation Routes Near Nuclear Power Plants AGENCY: Nuclear Regulatory... Nearby Facilities and on Transportation Routes Near Nuclear Power Plants.'' This regulatory guide describes for applicants seeking nuclear power reactor licenses and licensees of nuclear power reactors...
76 FR 14747 - Revision of Fee Schedules; Fee Recovery for Fiscal Year 2011
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-17
... Standards VI. Environmental Impact: Categorical Exclusion VII. Paperwork Reduction Act Statement VIII... nuclear reactors. The NRC has prepared a paper for the Commission's information in support of the Nuclear Energy Institute's position to calculate annual fees for each new licensed power reactor as a function of...
10 CFR 52.35 - Use of site for other purposes.
Code of Federal Regulations, 2013 CFR
2013-01-01
..., Office of New Reactors or Director, Office of Nuclear Reactor Regulation, as appropriate, (Director) of... NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS... informs the Director that the holder no longer intends to use the site for a nuclear power plant, the...
10 CFR 2.318 - Commencement and termination of jurisdiction of presiding officer.
Code of Federal Regulations, 2010 CFR
2010-01-01
..., whichever is earliest. (b) The Director, Office of Nuclear Reactor Regulation, Director, Office of New Reactors, or the Director, Office of Nuclear Material Safety and Safeguards, as appropriate, may issue an... officer. 2.318 Section 2.318 Energy NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING...
10 CFR 2.318 - Commencement and termination of jurisdiction of presiding officer.
Code of Federal Regulations, 2012 CFR
2012-01-01
..., whichever is earliest. (b) The Director, Office of Nuclear Reactor Regulation, Director, Office of New Reactors, or the Director, Office of Nuclear Material Safety and Safeguards, as appropriate, may issue an... officer. 2.318 Section 2.318 Energy NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING...
10 CFR 52.15 - Filing of applications.
Code of Federal Regulations, 2012 CFR
2012-01-01
... permit with the Director, Office of New Reactors, or the Director, Office of Nuclear Reactor Regulation... 10 Energy 2 2012-01-01 2012-01-01 false Filing of applications. 52.15 Section 52.15 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS Early Site...
10 CFR 52.35 - Use of site for other purposes.
Code of Federal Regulations, 2014 CFR
2014-01-01
..., Office of New Reactors or Director, Office of Nuclear Reactor Regulation, as appropriate, (Director) of... NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS... informs the Director that the holder no longer intends to use the site for a nuclear power plant, the...
10 CFR 52.35 - Use of site for other purposes.
Code of Federal Regulations, 2012 CFR
2012-01-01
..., Office of New Reactors or Director, Office of Nuclear Reactor Regulation, as appropriate, (Director) of... NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS... informs the Director that the holder no longer intends to use the site for a nuclear power plant, the...
10 CFR 52.35 - Use of site for other purposes.
Code of Federal Regulations, 2010 CFR
2010-01-01
..., Office of New Reactors or Director, Office of Nuclear Reactor Regulation, as appropriate, (Director) of... NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS... informs the Director that the holder no longer intends to use the site for a nuclear power plant, the...
10 CFR 52.35 - Use of site for other purposes.
Code of Federal Regulations, 2011 CFR
2011-01-01
..., Office of New Reactors or Director, Office of Nuclear Reactor Regulation, as appropriate, (Director) of... NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS... informs the Director that the holder no longer intends to use the site for a nuclear power plant, the...
10 CFR 52.15 - Filing of applications.
Code of Federal Regulations, 2011 CFR
2011-01-01
... permit with the Director, Office of New Reactors, or the Director, Office of Nuclear Reactor Regulation... 10 Energy 2 2011-01-01 2011-01-01 false Filing of applications. 52.15 Section 52.15 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS Early Site...
10 CFR 52.15 - Filing of applications.
Code of Federal Regulations, 2013 CFR
2013-01-01
... permit with the Director, Office of New Reactors, or the Director, Office of Nuclear Reactor Regulation... 10 Energy 2 2013-01-01 2013-01-01 false Filing of applications. 52.15 Section 52.15 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS Early Site...
10 CFR 52.15 - Filing of applications.
Code of Federal Regulations, 2014 CFR
2014-01-01
... permit with the Director, Office of New Reactors, or the Director, Office of Nuclear Reactor Regulation... 10 Energy 2 2014-01-01 2014-01-01 false Filing of applications. 52.15 Section 52.15 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS Early Site...
10 CFR 52.15 - Filing of applications.
Code of Federal Regulations, 2010 CFR
2010-01-01
... permit with the Director, Office of New Reactors, or the Director, Office of Nuclear Reactor Regulation... 10 Energy 2 2010-01-01 2010-01-01 false Filing of applications. 52.15 Section 52.15 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS Early Site...
10 CFR 2.318 - Commencement and termination of jurisdiction of presiding officer.
Code of Federal Regulations, 2011 CFR
2011-01-01
..., whichever is earliest. (b) The Director, Office of Nuclear Reactor Regulation, Director, Office of New Reactors, or the Director, Office of Nuclear Material Safety and Safeguards, as appropriate, may issue an... officer. 2.318 Section 2.318 Energy NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-03
..., ``Generic Aging Lessons Learned Report'' (GALL Report), for the aging management of Pressurized Water... communicate insights and lessons learned and to address emergent issues not covered in license renewal... ensure that PWR license renewal applicants will adequately address age-related degradation and aging...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-24
... Power Station, Unit 1; Exemption From Certain Security Requirements 1.0 Background Exelon Nuclear is the licensee and holder of Facility Operating License No. DPR-2 issued for Dresden Nuclear Power Station (DNPS... protection of licensed activities in nuclear power reactors against radiological sabotage,'' paragraph (b)(1...
31 CFR 500.584 - Energy sector projects in North Korea.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 31 Money and Finance: Treasury 3 2010-07-01 2010-07-01 false Energy sector projects in North Korea... Licenses, Authorizations and Statements of Licensing Policy § 500.584 Energy sector projects in North Korea... energy sector projects in North Korea in connection with that country's transition to light-water reactor...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-07
...-Water Reactors] Steam Generator Tubes'' [Reference 7] and NEI [Nuclear Energy Institute] 97-06, ``Steam... CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared for these... the required structural margins of the SG tubes for both normal and accident conditions. Nuclear...
78 FR 2295 - Charlissa C. Smith; Establishment of Atomic Safety and Licensing Board
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-10
... NUCLEAR REGULATORY COMMISSION [Docket No. 55-23694-SP; ASLBP No. 13-925-01-SP-BD01] Charlissa C... (Board) is being established to preside over the following proceeding: Charlissa C. Smith, (Denial of Senior Reactor Operator License). This proceeding concerns a hearing request from Charlissa C. Smith...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-08-01
The Knowledge and Abilities Catalog for Nuclear Power Plant Operators: Boiling-Water Reactors (BWRs) (NUREG-1123, Revision 1) provides the basis for the development of content-valid licensing examinations for reactor operators (ROs) and senior reactor operators (SROs). The examinations developed using the BWR Catalog along with the Operator Licensing Examiner Standards (NUREG-1021) and the Examiner`s Handbook for Developing Operator Licensing Written Examinations (NUREG/BR-0122), will cover the topics listed under Title 10, Code of Federal Regulations, Part 55 (10 CFR 55). The BWR Catalog contains approximately 7,000 knowledge and ability (K/A) statements for ROs and SROs at BWRs. The catalog is organized intomore » six major sections: Organization of the Catalog, Generic Knowledge and Ability Statements, Plant Systems grouped by Safety Functions, Emergency and Abnormal Plant Evolutions, Components, and Theory. Revision 1 to the BWR Catalog represents a modification in form and content of the original catalog. The K/As were linked to their applicable 10 CFR 55 item numbers. SRO level K/As were identified by 10 CFR 55.43 item numbers. The plant-wide generic and system generic K/As were combined in one section with approximately one hundred new K/As. Component Cooling Water and Instrument Air Systems were added to the Systems Section. Finally, High Containment Hydrogen Concentration and Plant Fire On Site evolutions added to the Emergency and Abnormal Plant Evolutions section.« less
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 2 2013-01-01 2013-01-01 false Temporary storage of spent fuel after cessation of reactor operation-generic determination of no significant environmental impact. 51.23 Section 51.23 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-21
... NUCLEAR REGULATORY COMMISSION [NRC-2012-0284; Docket No. 50-247; License No. DPR-26] Entergy Nuclear Operations, Inc., Entergy Nuclear Indian Point Unit 2, LLC, Issuance of Director's Decision Notice is hereby given that the Deputy Director, Reactor Safety Programs, Office of Nuclear Reactor...
77 FR 30435 - In-core Thermocouples at Different Elevations and Radial Positions in Reactor Core
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-23
... NUCLEAR REGULATORY COMMISSION 10 CFR Part 50 [Docket No. PRM-50-105; NRC-2012-0056] In-core Thermocouples at Different Elevations and Radial Positions in Reactor Core AGENCY: Nuclear Regulatory Commission... of operating licenses for nuclear power plants (``NPP'') to operate NPPs with in-core thermocouples...
76 FR 30404 - Advisory Committee On Reactor Safeguards; Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-25
... Room T2-B1, 11545 Rockville Pike, Rockville, Maryland 8:30 a.m.-8:35 a.m.: Opening Remarks by the ACRS... Alloy Cladding.'' 10:45 a.m.-11:45 a.m.: Revised Safety Evaluation Report Associated with the License... to the safety evaluation report associated with the license renewal application for the Hope Creek...
78 FR 29393 - University of Missouri-Columbia Facility Operating License No. R-103
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-20
... Curators of the University of Missouri--Columbia (the licensee) to operate the Missouri University Research Reactor (MURR) at a maximum steady-state thermal power of 10 megawatts (MW). The renewed license would authorize the licensee to operate the MURR up to a steady-state thermal power of 10 MW for an additional 20...
10 CFR 2.402 - Separate hearings on separate issues; consolidation of proceedings.
Code of Federal Regulations, 2010 CFR
2010-01-01
... appendix N of part 50 of this chapter for construction permits for nuclear power reactors of a type... Licenses To Construct and/or Operate Nuclear Power Plants of Identical Design at Multiple Sites § 2.402... proceedings. 2.402 Section 2.402 Energy NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-28
...; Notice of Withdrawal of Application for Amendment to Renewed Facility Operating License The U.S. Nuclear... December 9, 2010, for a proposed amendment to Renewed Facility Operating License No. NPF-63 for the Shearon... Pressurized Water Reactors,'' to the Core Operating Limits Report methodologies list. This change would have...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-29
... License Application for Bell Bend Nuclear Power Plant; Exemption 1.0 Background PPL Bell Bend, LLC... for Nuclear Power Plants.'' This reactor is to be identified as Bell Bend Nuclear Power Plant (BBNPP... based upon the U.S. EPR reference COL (RCOL) application for UniStar's Calvert Cliffs Nuclear Power...
1988-02-18
programme. It has a licensing agreement with Siemens AG’s Kraftwerk Union AG, which is its minor shareholder. Under this agreement, ENACE has the...Argentine nuclear programme. It has a licensing agreement with Siemens AG’s Kraftwerk Union AG, which is its minor shareholder. Under this agreement, ENACE
78 FR 15747 - Charlissa C. Smith (Denial of Senior Reactor Operator License)
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-12
... NUCLEAR REGULATORY COMMISSION [Docket No. 55-23694-SP; ASLBP No. 13-925-01-SP-BD01] Charlissa C... Reconstitution Pursuant to 10 CFR 2.313(c) and 2.321(b), the Atomic Safety and Licensing Board (Board) in the above-captioned Charlissa C. Smith case is hereby reconstituted because Administrative Judge Alan S...
Chapter 5, "License Renewal and Aging Management for Continued Service
DOE Office of Scientific and Technical Information (OSTI.GOV)
Naus, Dan J
As of August 2011, there were 104 commercial nuclear power reactors licensed to operate in 31 states in the United States. Initial operating licenses in the United States are granted for a period of 40 years. In order to help assure an adequate energy supply, the USNRC has established a timely license renewal process and clear requirements that are needed to ensure safe plant operation for an extended plant life. The principals of license renewal and the basic requirements that address license renewal are identified as well as additional sources of guidance that can be utilized as part of themore » license renewal process. Aging management program inspections and operating experience related to the concrete and steel containment structures are provided. Finally, several lessons learned are provided based on containment operating experience.« less
NASA Astrophysics Data System (ADS)
Scarlat, Raluca O.; Peterson, Per F.
2014-01-01
The fluoride salt cooled high temperature reactor (FHR) is a class of fission reactor designs that use liquid fluoride salt coolant, TRISO coated particle fuel, and graphite moderator. Heavy ion fusion (HIF) can likewise make use of liquid fluoride salts, to create thick or thin liquid layers to protect structures in the target chamber from ablation by target X-rays and damage from fusion neutron irradiation. This presentation summarizes ongoing work in support of design development and safety analysis of FHR systems. Development work for fluoride salt systems with application to both FHR and HIF includes thermal-hydraulic modeling and experimentation, salt chemistry control, tritium management, salt corrosion of metallic alloys, and development of major components (e.g., pumps, heat exchangers) and gas-Brayton cycle power conversion systems. In support of FHR development, a thermal-hydraulic experimental test bay for separate effects (SETs) and integral effect tests (IETs) was built at UC Berkeley, and a second IET facility is under design. The experiments investigate heat transfer and fluid dynamics and they make use of oils as simulant fluids at reduced scale, temperature, and power of the prototypical salt-cooled system. With direct application to HIF, vortex tube flow was investigated in scaled experiments with mineral oil. Liquid jets response to impulse loading was likewise studied using water as a simulant fluid. A set of four workshops engaging industry and national laboratory experts were completed in 2012, with the goal of developing a technology pathway to the design and licensing of a commercial FHR. The pathway will include experimental and modeling efforts at universities and national laboratories, requirements for a component test facility for reliability testing of fluoride salt equipment at prototypical conditions, requirements for an FHR test reactor, and development of a pre-conceptual design for a commercial reactor.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Woods, Brian; Gutowska, Izabela; Chiger, Howard
Computer simulations of nuclear reactor thermal-hydraulic phenomena are often used in the design and licensing of nuclear reactor systems. In order to assess the accuracy of these computer simulations, computer codes and methods are often validated against experimental data. This experimental data must be of sufficiently high quality in order to conduct a robust validation exercise. In addition, this experimental data is generally collected at experimental facilities that are of a smaller scale than the reactor systems that are being simulated due to cost considerations. Therefore, smaller scale test facilities must be designed and constructed in such a fashion tomore » ensure that the prototypical behavior of a particular nuclear reactor system is preserved. The work completed through this project has resulted in scaling analyses and conceptual design development for a test facility capable of collecting code validation data for the following high temperature gas reactor systems and events— 1. Passive natural circulation core cooling system, 2. pebble bed gas reactor concept, 3. General Atomics Energy Multiplier Module reactor, and 4. prismatic block design steam-water ingress event. In the event that code validation data for these systems or events is needed in the future, significant progress in the design of an appropriate integral-type test facility has already been completed as a result of this project. Where applicable, the next step would be to begin the detailed design development and material procurement. As part of this project applicable scaling analyses were completed and test facility design requirements developed. Conceptual designs were developed for the implementation of these design requirements at the Oregon State University (OSU) High Temperature Test Facility (HTTF). The original HTTF is based on a ¼-scale model of a high temperature gas reactor concept with the capability for both forced and natural circulation flow through a prismatic core with an electrical heat source. The peak core region temperature capability is 1400°C. As part of this project, an inventory of test facilities that could be used for these experimental programs was completed. Several of these facilities showed some promise, however, upon further investigation it became clear that only the OSU HTTF had the power and/or peak temperature limits that would allow for the experimental programs envisioned herein. Thus the conceptual design and feasibility study development focused on examining the feasibility of configuring the current HTTF to collect validation data for these experimental programs. In addition to the scaling analyses and conceptual design development, a test plan was developed for the envisioned modified test facility. This test plan included a discussion on an appropriate shakedown test program as well as the specific matrix tests. Finally, a feasibility study was completed to determine the cost and schedule considerations that would be important to any test program developed to investigate these designs and events.« less
Research and Development Roadmaps for Liquid Metal Cooled Fast Reactors
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kim, T. K.; Grandy, C.; Natesan, K.
The United States Department of Energy (DOE) commissioned the development of technology roadmaps for advanced (non-light water reactor) reactor concepts to help focus research and development funding over the next five years. The roadmaps show the research and development needed to support demonstration of an advanced (non-LWR) concept by the early 2030s, consistent with DOE’s Vision and Strategy for the Development and Deployment of Advanced Reactors. The intent is only to convey the technical steps that would be required to achieve such a goal; the means by which DOE will determine whether to invest in specific tasks will be treatedmore » separately. The starting point for the roadmaps is the Technical Readiness Assessment performed as part of an Advanced Test and Demonstration Reactor study released in 2016. The roadmaps were developed based upon a review of technical reports and vendor literature summarizing the technical maturity of each concept and the outstanding research and development needs. Critical path tasks for specific systems were highlighted on the basis of time and resources needed to complete the tasks and the importance of the system to the performance of the reactor concept. The roadmaps are generic, i.e. not specific to a particular vendor’s design but vendor design information may have been used as representative of the concept family. In the event that both near-term and more advanced versions of a concept are being developed, either a single roadmap with multiple branches or separate roadmaps for each version were developed. In each case, roadmaps point to a demonstration reactor (engineering or commercial) and show the activities that must be completed in parallel to support that demonstration in the 2030-2035 window. This report provides the roadmaps for two fast reactor concepts, the Sodium-cooled Fast Reactor (SFR) and the Lead-cooled Fast Reactor (LFR). The SFR technology is mature enough for commercial demonstration by the early 2030s, and the remaining critical paths and R&D needs are generally related to the completion of qualification of fuel and structural materials, validation of reactor design codes and methods, and support of the licensing frameworks. The LFR’s technology is instead less-mature compared to the SFR’s, and will be at the engineering demonstration stage by the early 2030s. Key LFR technology development activities will focus on resolving remaining design challenges and demonstrating the viability of systems and components in the integral system, which will be done in parallel with addressing the gaps shared with SFR technology. The approach and timeline presented here assume that, for the first module demonstration, vendors would pursue a two-step licensing process based on 10CFR Part 50.« less
Code of Federal Regulations, 2010 CFR
2010-01-01
... REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING PROCEEDINGS AND ISSUANCE OF ORDERS Additional... Issuance of Limited Work Authorizations Early Partial Decisions on Site Suitability-Construction Permit § 2... processing, the Director of the Office of New Reactors or the Director of the Office of Nuclear Reactor...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-30
..., Office of New Reactors, U.S. Nuclear Regulatory Commission, Washington DC, 20555- 0001; telephone: 301...) application for two units of Westinghouse Electric Company's AP1000 advanced pressurized water reactors to be... Bellefonte Nuclear Plant, Units 3 and 4 (BLN 3&4) COL application on January 28, 2008. On September 29, 2010...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-06
... NUCLEAR REGULATORY COMMISSION Advisory Committee on Reactor Safeguards (ACRS); Meeting of the ACRS Subcommittee on US-APWR; Notice of Meeting The ACRS Subcommittee on US-APWR will hold a meeting on September 17...) associated with the US-APWR design certification and the Comanche Peak Combined License Application (COLA...
Code of Federal Regulations, 2014 CFR
2014-01-01
..., possession and storage only of special nuclear material at the site of the nuclear reactor for use as fuel in operation of the nuclear reactor after issuance of either an operating license under 10 CFR part 50 or... NUCLEAR REGULATORY COMMISSION (CONTINUED) FINANCIAL PROTECTION REQUIREMENTS AND INDEMNITY AGREEMENTS...
Code of Federal Regulations, 2013 CFR
2013-01-01
..., possession and storage only of special nuclear material at the site of the nuclear reactor for use as fuel in operation of the nuclear reactor after issuance of either an operating license under 10 CFR part 50 or... NUCLEAR REGULATORY COMMISSION (CONTINUED) FINANCIAL PROTECTION REQUIREMENTS AND INDEMNITY AGREEMENTS...
Code of Federal Regulations, 2010 CFR
2010-01-01
..., possession and storage only of special nuclear material at the site of the nuclear reactor for use as fuel in operation of the nuclear reactor after issuance of either an operating license under 10 CFR part 50 or... NUCLEAR REGULATORY COMMISSION (CONTINUED) FINANCIAL PROTECTION REQUIREMENTS AND INDEMNITY AGREEMENTS...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-21
... issuance. FOR FURTHER INFORMATION CONTACT: Thomas J. Wengert, Office of Nuclear Reactor Regulation, U.S... Licensing, Office of Nuclear Reactor Regulation. [FR Doc. 2010-23516 Filed 9-20-10; 8:45 am] BILLING CODE... NUCLEAR REGULATORY COMMISSION [Docket Nos. 50-282 and 50-306; NRC-2010-0290] Northern States Power...
Code of Federal Regulations, 2011 CFR
2011-01-01
..., possession and storage only of special nuclear material at the site of the nuclear reactor for use as fuel in operation of the nuclear reactor after issuance of either an operating license under 10 CFR part 50 or... NUCLEAR REGULATORY COMMISSION (CONTINUED) FINANCIAL PROTECTION REQUIREMENTS AND INDEMNITY AGREEMENTS...
10 CFR 2.643 - Acceptance and docketing of application for limited work authorization.
Code of Federal Regulations, 2011 CFR
2011-01-01
... § 2.101(a)(9) is incomplete and not acceptable for processing, the Director of New Reactors or the Director of Nuclear Reactor Regulation will inform the applicant of this determination and the respects in... authorization. 2.643 Section 2.643 Energy NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING...
Code of Federal Regulations, 2012 CFR
2012-01-01
..., possession and storage only of special nuclear material at the site of the nuclear reactor for use as fuel in operation of the nuclear reactor after issuance of either an operating license under 10 CFR part 50 or... NUCLEAR REGULATORY COMMISSION (CONTINUED) FINANCIAL PROTECTION REQUIREMENTS AND INDEMNITY AGREEMENTS...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-04
... INFORMATION CONTACT: Pamela Longmire, Ph.D., Project Manager, Licensing Branch, Division of Spent Fuel Storage... Generating Plant (PINGP), Unit Nos. 1 and 2, site in Goodhue County, Minnesota. The TN-40 cask is currently..., higher burnup spent fuel used in the PINGP reactor as well as associated changes to the ISFSI's technical...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-19
... Reactor at the State University of New York at Buffalo AGENCY: Nuclear Regulatory Commission. ACTION... University of New York at Buffalo (UB) decommissioning plan (DP) by amendment to the Facility License R-77... in the NRC Library at http://www.nrc.gov/reading-rm/adams.html . To begin the search, select ``ADAMS...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-07
... Company D/B/A/ Dominion Virginia Power and Old Dominion Electric Cooperative, North Anna Power Station... combined license (COL) application to build and operate a new reactor at its North Anna Power Station (NAPS... Combined License (COL) for North Anna Power Station, Unit 3.'' A notice of availability of the final...
Regulatory Risk Reduction for Advanced Reactor Technologies – FY2016 Status and Work Plan Summary
DOE Office of Scientific and Technical Information (OSTI.GOV)
Moe, Wayne Leland
2016-08-01
Millions of public and private sector dollars have been invested over recent decades to realize greater efficiency, reliability, and the inherent and passive safety offered by advanced nuclear reactor technologies. However, a major challenge in experiencing those benefits resides in the existing U.S. regulatory framework. This framework governs all commercial nuclear plant construction, operations, and safety issues and is highly large light water reactor (LWR) technology centric. The framework must be modernized to effectively deal with non-LWR advanced designs if those designs are to become part of the U.S energy supply. The U.S. Department of Energy’s (DOE) Advanced Reactor Technologiesmore » (ART) Regulatory Risk Reduction (RRR) initiative, managed by the Regulatory Affairs Department at the Idaho National Laboratory (INL), is establishing a capability that can systematically retire extraneous licensing risks associated with regulatory framework incompatibilities. This capability proposes to rely heavily on the perspectives of the affected regulated community (i.e., commercial advanced reactor designers/vendors and prospective owner/operators) yet remain tuned to assuring public safety and acceptability by regulators responsible for license issuance. The extent to which broad industry perspectives are being incorporated into the proposed framework makes this initiative unique and of potential benefit to all future domestic non-LWR applicants« less
USING CFD TO ANALYZE NUCLEAR SYSTEMS BEHAVIOR: DEFINING THE VALIDATION REQUIREMENTS
DOE Office of Scientific and Technical Information (OSTI.GOV)
Richard Schultz
2012-09-01
A recommended protocol to formulate numeric tool specifications and validation needs in concert with practices accepted by regulatory agencies for advanced reactors is described. The protocol is based on the plant type and perceived transient and accident envelopes that translates to boundary conditions for a process that gives the: (a) key phenomena and figures-of-merit which must be analyzed to ensure that the advanced plant can be licensed, (b) specification of the numeric tool capabilities necessary to perform the required analyses—including bounding calculational uncertainties, and (c) specification of the validation matrices and experiments--including the desired validation data. The result of applyingmore » the process enables a complete program to be defined, including costs, for creating and benchmarking transient and accident analysis methods for advanced reactors. By following a process that is in concert with regulatory agency licensing requirements from the start to finish, based on historical acceptance of past licensing submittals, the methods derived and validated have a high probability of regulatory agency acceptance.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-06
...The U.S. Nuclear Regulatory Commission (NRC) is issuing for public comment draft regulatory guide (DG), DG-3042, ``Standard Format and Content for a License Application for an Independent Spent Fuel Storage Installation or a Monitored Retrievable Storage Facility.'' This draft regulatory guide is proposed revision 2 of Regulatory Guide 3.50, which provides a format that the NRC considers acceptable for submitting the information for license applications to store spent nuclear fuel, high-level radioactive waste, and/or reactor-related Greater than Class C waste.
Safety approach to the selection of design criteria for the CRBRP reactor refueling system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Meisl, C J; Berg, G E; Sharkey, N F
1979-01-01
The selection of safety design criteria for Liquid Metal Fast Breeder Reactor (LMFBR) refueling systems required the extrapolation of regulations and guidelines intended for Light Water Reactor refueling systems and was encumbered by the lack of benefit from a commercially licensed predecessor other than Fermi. The overall approach and underlying logic are described for developing safety design criteria for the reactor refueling system (RRS) of the Clinch River Breeder Reactor Plant (CRBRP). The complete selection process used to establish the criteria is presented, from the definition of safety functions to the finalization of safety design criteria in the appropriate documents.more » The process steps are illustrated by examples.« less
Code of Federal Regulations, 2010 CFR
2010-01-01
... Licenses To Construct and Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... FOR NUCLEAR POWER PLANTS Pt. 52, App. N Appendix N to Part 52—Standardization of Nuclear Power Plant... that the applicant wishes to have the application considered under 10 CFR part 52, appendix N, and must...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-25
..., Office of Nuclear Reactor Regulation. [FR Doc. 2010-1309 Filed 1-22-10; 8:45 am] BILLING CODE 7590-01-P ... NUCLEAR REGULATORY COMMISSION [Docket Nos. 50-282 and 50-306; NRC-2010-0022] License Nos. DPR-42 and DPR-60; Northern States Power Company; Prairie Island Nuclear Generating Plant, Units 1 and 2...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-30
... serves about 1,300 students. The Reed Research Reactor is housed in a section of the Psychology Building constructed specifically for that purpose. The section of the Psychology building housing the Reed Research... encompasses the entire Psychology Building and all areas 76 meters (250 feet) from the center of the reactor...
DOE Office of Scientific and Technical Information (OSTI.GOV)
L. C. Cadwallader; C. P. C. Wong; M. Abdou
2014-10-01
A leading power reactor breeding blanket candidate for a fusion demonstration power plant (DEMO) being pursued by the US Fusion Community is the Dual Coolant Lead Lithium (DCLL) concept. The safety hazards associated with the DCLL concept as a reactor blanket have been examined in several US design studies. These studies identify the largest radiological hazards as those associated with the dust generation by plasma erosion of plasma blanket module first walls, oxidation of blanket structures at high temperature in air or steam, inventories of tritium bred in or permeating through the ferritic steel structures of the blanket module andmore » blanket support systems, and the 210Po and 203Hg produced in the PbLi breeder/coolant. What these studies lack is the scrutiny associated with a licensing review of the DCLL concept. An insight into this process was gained during the US participation in the International Thermonuclear Experimental Reactor (ITER) Test Blanket Module (TBM) Program. In this paper we discuss the lessons learned during this activity and make safety proposals for the design of a Fusion Nuclear Science Facility (FNSF) or a DEMO that employs a lead lithium breeding blanket.« less
Air Shipment of Spent Nuclear Fuel from Romania to Russia
DOE Office of Scientific and Technical Information (OSTI.GOV)
Igor Bolshinsky; Ken Allen; Lucian Biro
Romania successfully completed the world’s first air shipment of spent nuclear fuel transported in Type B(U) casks under existing international laws and without shipment license special exceptions when the last Romanian highly enriched uranium (HEU) spent nuclear fuel was transported to the Russian Federation in June 2009. This air shipment required the design, fabrication, and licensing of special 20 foot freight containers and cask tiedown supports to transport the eighteen TUK 19 shipping casks on a Russian commercial cargo aircraft. The new equipment was certified for transport by road, rail, water, and air to provide multi modal transport capabilities formore » shipping research reactor spent fuel. The equipment design, safety analyses, and fabrication were performed in the Russian Federation and transport licenses were issued by both the Russian and Romanian regulatory authorities. The spent fuel was transported by truck from the VVR S research reactor to the Bucharest airport, flown by commercial cargo aircraft to the airport at Yekaterinburg, Russia, and then transported by truck to the final destination in a secure nuclear facility at Chelyabinsk, Russia. This shipment of 23.7 kg of HEU was coordinated by the Russian Research Reactor Fuel Return Program (RRRFR), as part of the U.S. Department of Energy Global Threat Reduction Initiative (GTRI), in close cooperation with the Rosatom State Atomic Energy Corporation and the International Atomic Energy Agency, and was managed in Romania by the National Commission for Nuclear Activities Control (CNCAN). This paper describes the planning, shipment preparations, equipment design, and license approvals that resulted in the safe and secure air shipment of this spent nuclear fuel.« less
NASA Astrophysics Data System (ADS)
Heidrich, Brenden J.
Nuclear power plants produce 20 percent of the electricity generated in the U.S. Nuclear generated electricity is increasingly valuable to a utility because it can be produced at a low marginal cost and it does not release any carbon dioxide. It can also be a hedge against uncertain fossil fuel prices. The construction of new nuclear power plants in the U.S. is cautiously moving forward, restrained by high capital costs. Since 1998, nuclear utilities have been increasing the power output of their reactors by implementing extended power up-rates. Power increases of up to 20 percent are allowed under this process. The equivalent of nine large power plants has been added via extended power up-rates. These up-rates require the replacement of large capital equipment and are often performed in concert with other plant life extension activities such as license renewals. This dissertation examines the effect of these extended power up-rates on the safety performance of U.S. boiling water reactors. Licensing event reports are submitted by the utilities to the Nuclear Regulatory Commission, the federal nuclear regulator, for a wide range of abnormal events. Two methods are used to examine the effect of extended power up-rates on the frequency of abnormal events at the reactors. The Crow/AMSAA model, a univariate technique is used to determine if the implementation of an extended power up-rate affects the rate of abnormal events. The method has a long history in the aerospace industry and in the military. At a 95-percent confidence level, the rate of events requiring the submission of a licensing event report decreases following the implementation of an extended power up-rate. It is hypothesized that the improvement in performance is tied to the equipment replacement and refurbishment that is performed as part of the up-rate process. The reactor performance is also analyzed using the proportional hazards model. This technique allows for the estimation of the effects of multiple independent variables on the event rate. Both the Cox and Weibull formulations were tested. The Cox formulation is more commonly used in survival analysis because of its flexibility. The best Cox model included fixed effects at the multi-reactor site level. The Weibull parametric formulation has the same base hazard rate as the Crow/AMSAA model. This theoretical connection was confirmed through a series of tests that demonstrated both models predicted the same base hazard rates. The Weibull formulation produced a model with most of the same statistically significant variables as the Cox model. The beneficial effect of extended power up-rates was predicted in the proportional hazards models as well as the Crow/AMSAA model. The Weibull model also indicated an effect that can be traced back to a plant’s construction. Performance was also found to improve in plants that had been divested from their original owners. This research developed a consistent evaluation toolkit for nuclear power plant performance using either a univariate method that allows for simple graphical evaluation at its heart or a more complex multivariate method that includes the effects of several independent variables with data that are available from public sources. Utilities or regulators with access to proprietary data may be able to expand upon this research with additional data that is not readily available to an academic researcher. Even without access to special data, the methods developed are valuable tools in evaluating and predicting nuclear power plant reliability performance.
Operating experience feedback report: New plants, Commercial power reactors
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dennig, R.L.; O'Reilly, P.D.
1987-07-01
This report documents a detailed review of the cause of unplanned events during the early months of licensed operation for plants licensed between March 1983 and April 1986. The major lessons and corrective actions that appear to have the greatest potential for improving the effectiveness of plant startups are provided for consideration through the operating experience feedback programs and activities of the industry and the NRC staff.
Code of Federal Regulations, 2013 CFR
2013-01-01
... in Light-Water-Cooled Nuclear Power Reactor Effluents I Appendix I to Part 50 Energy NUCLEAR... Criterion “As Low as is Reasonably Achievable” for Radioactive Material in Light-Water-Cooled Nuclear Power... light-water-cooled nuclear power reactors licensed under 10 CFR part 50 or part 52 of this chapter. The...
Code of Federal Regulations, 2012 CFR
2012-01-01
... in Light-Water-Cooled Nuclear Power Reactor Effluents I Appendix I to Part 50 Energy NUCLEAR... Criterion “As Low as is Reasonably Achievable” for Radioactive Material in Light-Water-Cooled Nuclear Power... light-water-cooled nuclear power reactors licensed under 10 CFR part 50 or part 52 of this chapter. The...
Code of Federal Regulations, 2014 CFR
2014-01-01
... in Light-Water-Cooled Nuclear Power Reactor Effluents I Appendix I to Part 50 Energy NUCLEAR... Criterion “As Low as is Reasonably Achievable” for Radioactive Material in Light-Water-Cooled Nuclear Power... light-water-cooled nuclear power reactors licensed under 10 CFR part 50 or part 52 of this chapter. The...
Aging Management Guideline for commercial nuclear power plants: Motor control centers; Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Toman, G.; Gazdzinski, R.; O`Hearn, E.
1994-02-01
This Aging Management Guideline (AMG) provides recommended methods for effective detection and mitigation of age-related degradation mechanisms in Boiling Water Reactor (BWR) and Pressurized Water Reactor (PWR) commercial nuclear power plant motor control centers important to license renewal. The intent of this AMG is to assist plant maintenance and operations personnel in maximizing the safe, useful life of these components. It also supports the documentation of effective aging management programs required under the License Renewal Rule 10 CFR Part 54. This AMG is presented in a manner that allows personnel responsible for performance analysis and maintenance to compare their plant-specificmore » aging mechanisms (expected or already experienced) and aging management program activities to the more generic results and recommendations presented herein.« less
Core Design Characteristics of the Fluoride Salt-Cooled High Temperature Demonstration Reactor
DOE Office of Scientific and Technical Information (OSTI.GOV)
Brown, Nicholas R; Qualls, A L; Betzler, Benjamin R
2016-01-01
Fluoride salt-cooled high temperature reactors (FHRs) are a promising reactor technology option with significant knowledge gaps to implementation. One potential approach to address those technology gaps is via a small-scale demonstration reactor with the goal of increasing the technology readiness level (TRL) of the overall system for the longer term. The objective of this paper is to outline a notional concept for such a system, and to address how the proposed concept would advance the TRL of FHR concepts. Development of the proposed FHR Demonstration Reactor (DR) will enable commercial FHR deployment through disruptive and rapid technology development and demonstration.more » The FHR DR will close remaining gaps to commercial viability. Lower risk technologies are included in the initial FHR DR design to ensure that the reactor can be built, licensed, and operated within an acceptable budget and schedule. Important capabilities that will be demonstrated by building and operating the FHR DR include core design methodologies; fabrication and operation of high temperature reactors; salt procurement, handling, maintenance, and ultimate disposal; salt chemistry control to maximize vessel life; tritium management; heat exchanger performance; pump performance; and reactivity control. The FHR DR is considered part of a broader set of FHR technology development and demonstration efforts, some of which are already underway. Nonreactor test efforts (e.g., heated salt loops or loops using simulant fluids) can demonstrate many technologies necessary for commercial deployment of FHRs. The FHR DR, however, fulfills a crucial role in FHR technology development by advancing the technical maturity and readiness level of the system as a whole.« less
Code of Federal Regulations, 2013 CFR
2013-01-01
... include: (A) Changes for temporary use of the land for public recreational purposes; (B) Site exploration... building with space for installation of a training reactor). (2) For materials licenses, taking any site...
Code of Federal Regulations, 2014 CFR
2014-01-01
... include: (A) Changes for temporary use of the land for public recreational purposes; (B) Site exploration... building with space for installation of a training reactor). (2) For materials licenses, taking any site...
Code of Federal Regulations, 2012 CFR
2012-01-01
... include: (A) Changes for temporary use of the land for public recreational purposes; (B) Site exploration... building with space for installation of a training reactor). (2) For materials licenses, taking any site...
COL Application Content Guide for HTGRs: Revision to RG 1.206, Part 1 - Status Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wayne Moe
2012-08-01
A combined license (COL) application is required by the Nuclear Regulatory Commission (NRC) for all proposed nuclear plants. The information requirements for a COL application are set forth in 10 CFR 52.79, “Contents of Applications; Technical Information in Final Safety Analysis Report.” An applicant for a modular high temperature gas-cooled reactor (HTGR) must develop and submit for NRC review and approval a COL application which conforms to these requirements. The technical information necessary to allow NRC staff to evaluate a COL application and resolve all safety issues related to a proposed nuclear plant is detailed and comprehensive. To this, Regulatorymore » Guide (RG) 1.206, “Combined License Applications for Nuclear Power Plants” (LWR Edition), was developed to assist light water reactor (LWR) applicants in incorporating and effectively formatting required information for COL application review (Ref. 1). However, the guidance prescribed in RG 1.206 presumes a LWR design proposal consistent with the systems and functions associated with large LWR power plants currently operating under NRC license.« less
AP1000{sup R} licensing and deployment in the United States
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jordan, R. P.; Russ, P. A.; Filiak, P. P.
2012-07-01
In recent years, both domestic and foreign utilities have turned to the standardized Westinghouse AP1000 plant design in satisfying their near - and long-term - sustainable energy needs. As direct support to these actions, licensing the AP1000 design has played a significant role by providing one of the fundamental bases in clearing regulatory hurdles leading to the start of new plant construction. Within the U.S. alone, Westinghouse AP1000 licensing activities have reached unprecedented milestones with the approvals of both AP1000 Design Certification and Southern Company's combined construction permit and operating license (COL) application directly supporting the construction of two newmore » nuclear plants in Georgia. Further COL application approvals are immediately pending for an additional two AP1000 plants in South Carolina. And, across the U.S. nuclear industry spectrum, there are 10 other COL applications under regulatory review representing some 16 new plants at 10 sites. In total, these actions represent the first wave of new plant licensing under the regulatory approval process since 1978. Fundamental to the Nuclear Regulatory Commission's AP1000 Design Certification is the formal recognition of the AP1000 passive safety design through regulatory acceptance rulemaking. Through recognition and deployment of the AP1000 Design Certification, the utility licensee / operator of this reactor design are now offered an opportunity to use a simplified 'one-step' combined license process, thereby managing substantial back-end construction schedule risk from regulatory and intervention delays. Application of this regulatory philosophy represents both acceptance and encouragement of standardized reactor designs like the AP1000. With the recent AP1000 Design Certification and utility COL acceptances, the fundamental licensing processes of this philosophy have successfully proven the attainment of significant milestones with the next stage licensing actions directed towards deployment. AP1000 Design Certification and COL deployment, and management of the plant construction in accordance with the conditions within these approvals, remain as significant site and corporate responsibilities. These licensing-construction integrated activities must now focus on identifying and resolving 'as-built' departures from the standardized design as assessed against the certified AP1000 technical and licensing basis. Within this paper, significant aspects of the AP1000 U.S. licensing will be discussed, including identifying systems and processes used in ensuring compliance while deploying the standardized design. Critical licensing steps, licensing deployment actions as plant construction progresses and defining the road forward to a successful completion of licensing actions will be addressed. (authors)« less
DUCTILE-PHASE TOUGHENED TUNGSTEN FOR PLASMA-FACING MATERIALS IN FUSION REACTORS
DOE Office of Scientific and Technical Information (OSTI.GOV)
Henager, Charles H.; Setyawan, Wahyu; Roosendaal, Timothy J.
2017-05-01
Tungsten (W) and W-alloys are the leading candidates for plasma-facing components in nuclear fusion reactor designs because of their high melting point, strength retention at high temperatures, high thermal conductivity, and low sputtering yield. However, tungsten is brittle and does not exhibit the required fracture toughness for licensing in nuclear applications. A promising approach to increasing fracture toughness of W-alloys is by ductile-phase toughening (DPT). In this method, a ductile phase is included in a brittle matrix to prevent on inhibit crack propagation by crack blunting, crack bridging, crack deflection, and crack branching. Model examples of DPT tungsten are exploredmore » in this study, including W-Cu and W-Ni-Fe powder product composites. Three-point and four-point notched and/or pre-cracked bend samples were tested at several strain rates and temperatures to help understand deformation, cracking, and toughening in these materials. Data from these tests are used for developing and calibrating crack-bridging models. Finite element damage mechanics models are introduced as a modeling method that appears to capture the complexity of crack growth in these materials.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Little, G.A.
For better than ten years there was little public notice of the TRIGA reactor at UC-Berkeley. Then: a) A non-student persuaded the Student and Senate to pass a resolution to request Campus Administration to stop operation of the reactor and remove it from campus. b) Presence of the reactor became a campaign-issue in a City Mayoral election. c) Two local residents reported adverse physical reactions before, during, and after a routine tour of the reactor facility. d) The Berkeley City Council began a study of problems associated with radioactive material within the city. e) Friends Of The Earth formally petitionedmore » the NRC to terminate the reactor's license. Campus personnel have expended many man-hours and many pounds of paper in responding to these happenings. Some of the details are of interest, and may be of use to other reactor facilities. (author)« less
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-17
... SNM in the form of fully-assembled fuel assemblies that would later form the initial reactor core of WBN2. The SNM in the fuel assemblies is enriched up to 5% in the isotope U-235. The fresh fuel... received the initial core for WBN2. The NRC has not yet issued the OL for the Unit 2 reactor. The...
Generation III reactors safety requirements and the design solutions
NASA Astrophysics Data System (ADS)
Felten, P.
2009-03-01
Nuclear energy's public acceptance, and hence its development, depends on its safety. As a reactor designer, we will first briefly remind the basic safety principles of nuclear reactors' design. We will then show how the industry, and in particular Areva with its EPR, made design evolution in the wake of the Three Miles Island accident in 1979. In particular, for this new generation of reactors, severe accidents are taken into account beyond the standard design basis accidents. Today, Areva's EPR meets all so-called "generation III" safety requirements and was licensed by several nuclear safety authorities in the world. Many innovative solutions are integrated in the EPR, some of which will be introduced here.
Scientist vs. Citizen: The Shoreham Controversy
ERIC Educational Resources Information Center
Carl, Ann; Sailor, Vance L.
1972-01-01
Two views on the issue of nuclear reactor safety with reference to the license application of a nuclear power plant on Long Island. Each side presents scientific arguments concerning the safety standards proposed. (AL)
Pre-Licensing Evaluation of Legacy SFR Metallic Fuel Data
DOE Office of Scientific and Technical Information (OSTI.GOV)
Yacout, A. M.; Billone, M. C.
2016-09-16
The US sodium cooled fast reactor (SFR) metallic fuel performance data that are of interest to advanced fast reactors applications, can be attributed mostly to the Integral Fast Reactor (IFR) program between 1984 and 1994. Metallic fuel data collected prior to the IFR program were associated with types of fuel that are not of interest to future advanced reactors deployment (e.g., previous U-Fissium alloy fuel). The IFR fuels data were collected from irradiation of U-Zr based fuel alloy, with and without Pu additions, and clad in different types of steels, including HT9, D9, and 316 stainless-steel. Different types of datamore » were generated during the program, and were based on the requirements associated with the DOE Advanced Liquid Metal Cooled Reactor (ALMR) program.« less
Expanded scope of training and education programs at the UFTR
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vernetson, W.G.; Whaley, P.M.
1985-01-01
Historically, the University of Florida Training Reactor (UFTR) has been used to train both hot and cold license reactor operator candidates in intensive two- and three-week training programs consisting of a correlated set of classroom lectures, hands-on reactor operations, and laboratory exercises. These training programs provide nuclear plant operating staff with fundamental operational experience in understanding, controlling, and evaluating subcritical multiplication, reactivity effects, reactivity manipulations, and reactor operations; a sufficient number of startups and shutdowns is also assured. The UDTR is also used in a nuclear engineering course entitled ''Principles of Nuclear Reactor Operations.'' The purpose of this paper ismore » to report the results of efforts to redirect and refine tractor operations educational and training programs at the UFTR.« less
Qualls, A. Louis; Betzler, Benjamin R.; Brown, Nicholas R.; ...
2016-12-21
Engineering demonstration reactors are nuclear reactors built to establish proof of concept for technology options that have never been built. Examples of engineering demonstration reactors include Peach Bottom 1 for high temperature gas-cooled reactors (HTGRs) and Experimental Breeder Reactor-II (EBR-II) for sodium-cooled fast reactors. Historically, engineering demonstrations have played a vital role in advancing the technology readiness level of reactor technologies. Our paper details a preconceptual design for a fluoride salt-cooled engineering demonstration reactor. The fluoride salt-cooled high-temperature reactor (FHR) demonstration reactor (DR) is a concept for a salt-cooled reactor with 100 megawatts of thermal output (MWt). It would usemore » tristructural-isotropic (TRISO) particle fuel within prismatic graphite blocks. FLiBe (2 7LiF-BeF2) is the reference primary coolant. The FHR DR is designed to be small, simple, and affordable. Development of the FHR DR is a necessary intermediate step to enable near-term commercial FHRs. The design philosophy of the FHR DR was focused on safety, near-term deployment, and flexibility. Lower risk technologies are purposely included in the initial FHR DR design to ensure that the reactor can be built, licensed, and operated as an engineering demonstration with minimal risk and cost. These technologies include TRISO particle fuel, replaceable core structures, and consistent structural material selection for core structures and the primary and intermediate loops, and tube-and-shell primary-to-intermediate heat exchangers. Important capabilities to be demonstrated by building and operating the FHR DR include fabrication and operation of high temperature reactors; heat exchanger performance (including passive decay heat removal); pump performance; and reactivity control; salt chemistry control to maximize vessel life; tritium management; core design methodologies; salt procurement, handling, maintenance and ultimate disposal. It is recognized that non-nuclear separate and integral test efforts (e.g., heated salt loops or loops using simulant fluids) are necessary to develop the technologies that will be demonstrated in the FHR DR.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Qualls, A. Louis; Betzler, Benjamin R.; Brown, Nicholas R.
Engineering demonstration reactors are nuclear reactors built to establish proof of concept for technology options that have never been built. Examples of engineering demonstration reactors include Peach Bottom 1 for high temperature gas-cooled reactors (HTGRs) and Experimental Breeder Reactor-II (EBR-II) for sodium-cooled fast reactors. Historically, engineering demonstrations have played a vital role in advancing the technology readiness level of reactor technologies. Our paper details a preconceptual design for a fluoride salt-cooled engineering demonstration reactor. The fluoride salt-cooled high-temperature reactor (FHR) demonstration reactor (DR) is a concept for a salt-cooled reactor with 100 megawatts of thermal output (MWt). It would usemore » tristructural-isotropic (TRISO) particle fuel within prismatic graphite blocks. FLiBe (2 7LiF-BeF2) is the reference primary coolant. The FHR DR is designed to be small, simple, and affordable. Development of the FHR DR is a necessary intermediate step to enable near-term commercial FHRs. The design philosophy of the FHR DR was focused on safety, near-term deployment, and flexibility. Lower risk technologies are purposely included in the initial FHR DR design to ensure that the reactor can be built, licensed, and operated as an engineering demonstration with minimal risk and cost. These technologies include TRISO particle fuel, replaceable core structures, and consistent structural material selection for core structures and the primary and intermediate loops, and tube-and-shell primary-to-intermediate heat exchangers. Important capabilities to be demonstrated by building and operating the FHR DR include fabrication and operation of high temperature reactors; heat exchanger performance (including passive decay heat removal); pump performance; and reactivity control; salt chemistry control to maximize vessel life; tritium management; core design methodologies; salt procurement, handling, maintenance and ultimate disposal. It is recognized that non-nuclear separate and integral test efforts (e.g., heated salt loops or loops using simulant fluids) are necessary to develop the technologies that will be demonstrated in the FHR DR.« less
Radiation Damage In Reactor Cavity Concrete
DOE Office of Scientific and Technical Information (OSTI.GOV)
Field, Kevin G; Le Pape, Yann; Naus, Dan J
License renewal up to 60 years and the possibility of subsequent license renewal to 80 years has established a renewed focus on long-term aging of nuclear generating stations materials, and recently, on concrete. Large irreplaceable sections of most nuclear generating stations include concrete. The Expanded Materials Degradation Analysis (EMDA), jointly performed by the Department of Energy, the Nuclear Regulatory Commission and Industry, identified the urgent need to develop a consistent knowledge base on irradiation effects in concrete. Much of the historical mechanical performance data of irradiated concrete does not accurately reflect typical radiation conditions in NPPs or conditions out tomore » 60 or 80 years of radiation exposure. To address these potential gaps in the knowledge base, The Electric Power Research Institute and Oak Ridge National Laboratory are working to disposition radiation damage as a degradation mechanism. This paper outlines the research program within this pathway including: (i) defining the upper bound of the neutron and gamma dose levels expected in the biological shield concrete for extended operation (80 years of operation and beyond), (ii) determining the effects of neutron and gamma irradiation as well as extended time at temperature on concrete, (iii) evaluating opportunities to irradiate prototypical concrete under accelerated neutron and gamma dose levels to establish a conservative bound and share data obtained from different flux, temperature, and fluence levels, (iv) evaluating opportunities to harvest and test irradiated concrete from international NPPs, (v) developing cooperative test programs to improve confidence in the results from the various concretes and research reactors, (vi) furthering the understanding of the effects of radiation on concrete (see companion paper) and (vii) establishing an international collaborative research and information exchange effort to leverage capabilities and knowledge.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Liao, J.; Kucukboyaci, V. N.; Nguyen, L.
2012-07-01
The Westinghouse Small Modular Reactor (SMR) is an 800 MWt (> 225 MWe) integral pressurized water reactor (iPWR) with all primary components, including the steam generator and the pressurizer located inside the reactor vessel. The reactor core is based on a partial-height 17x17 fuel assembly design used in the AP1000{sup R} reactor core. The Westinghouse SMR utilizes passive safety systems and proven components from the AP1000 plant design with a compact containment that houses the integral reactor vessel and the passive safety systems. A preliminary loss of coolant accident (LOCA) analysis of the Westinghouse SMR has been performed using themore » WCOBRA/TRAC-TF2 code, simulating a transient caused by a double ended guillotine (DEG) break in the direct vessel injection (DVI) line. WCOBRA/TRAC-TF2 is a new generation Westinghouse LOCA thermal-hydraulics code evolving from the US NRC licensed WCOBRA/TRAC code. It is designed to simulate PWR LOCA events from the smallest break size to the largest break size (DEG cold leg). A significant number of fluid dynamics models and heat transfer models were developed or improved in WCOBRA/TRAC-TF2. A large number of separate effects and integral effects tests were performed for a rigorous code assessment and validation. WCOBRA/TRAC-TF2 was introduced into the Westinghouse SMR design phase to assist a quick and robust passive cooling system design and to identify thermal-hydraulic phenomena for the development of the SMR Phenomena Identification Ranking Table (PIRT). The LOCA analysis of the Westinghouse SMR demonstrates that the DEG DVI break LOCA is mitigated by the injection and venting from the Westinghouse SMR passive safety systems without core heat up, achieving long term core cooling. (authors)« less
NASA Astrophysics Data System (ADS)
Tabor, R. W.
1986-09-01
The conflict between regulation and healthy evolution of geological science has contributed to the difficulties of siting nuclear reactors. On the Columbia Plateau in Washington, but for conservative design of the Hanford reactor facility, the recognition of the little-understood Olympic-Wallowa lineament as a major, possibly still active structural alinement might have jeopardized the acceptability of the site for nuclear reactors. On the Olympic Peninsula, evolving concepts of compressive structures and their possible recent activity and the current recognition of a subducting Juan de Fuca plate and its potential for generating great earthquakes—both concepts little-considered during initial site selection—may delay final acceptance of the Satsop site. Conflicts of this sort are inevitable but can be accommodated if they are anticipated in the reactor-licensing process. More important, society should be increasing its store of geologic knowledge now, during the current recess in nuclear reactor siting.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-25
... operating pressures, leakage from primary water stress corrosion cracking below the proposed limited... discussed in Regulatory Guide (RG) 1.121, ``Bases for Plugging Degraded PWR [Pressurized-Water Reactor...
Water NSTF Design, Instrumentation, and Test Planning
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lisowski, Darius D.; Gerardi, Craig D.; Hu, Rui
The following report serves as a formal introduction to the water-based Natural convection Shutdown heat removal Test Facility (NSTF) program at Argonne. Since 2005, this US Department of Energy (DOE) sponsored program has conducted large scale experimental testing to generate high-quality and traceable validation data for guiding design decisions of the Reactor Cavity Cooling System (RCCS) concept for advanced reactor designs. The most recent facility iteration, and focus of this report, is the operation of a 1/2 scale model of a water-RCCS concept. Several features of the NSTF prototype align with the conceptual design that has been publicly released formore » the AREVA 625 MWt SC-HTGR. The design of the NSTF also retains all aspects common to a fundamental boiling water thermosiphon, and thus is well poised to provide necessary experimental data to advance basic understanding of natural circulation phenomena and contribute to computer code validation. Overall, the NSTF program operates to support the DOE vision of aiding US vendors in design choices of future reactor concepts, advancing the maturity of codes for licensing, and ultimately developing safe and reliable reactor technologies. In this report, the top-level program objectives, testing requirements, and unique considerations for the water cooled test assembly are discussed, and presented in sufficient depth to support defining the program’s overall scope and purpose. A discussion of the proposed 6-year testing program is then introduced, which outlines the specific strategy and testing plan for facility operations. The proposed testing plan has been developed to meet the toplevel objective of conducting high-quality test operations that span across a broad range of single- and two-phase operating conditions. Details of characterization, baseline test cases, accident scenario, and parametric variations are provided, including discussions of later-stage test cases that examine the influence of geometric variations and off-normal configurations. The facility design follows, including as-built dimensions and specifications of the various mechanical and liquid systems, design choices for the test section, water storage tank, and network piping. Specifications of the instrumentation suite are then presented, along with specific information on performance windows, measurement uncertainties, and installation locations. Finally, descriptions of the control systems and heat removal networks are provided, which have been engineered to support precise quantification of energy balances and facilitate well-controlled test operations.« less
Control console replacement at the WPI Reactor
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-01-01
With partial funding from the Department of Energy (DOE) University Reactor Instrumentation Upgrade Program (DOE Grant No. DE-FG02-90ER12982), the original control console at the Worcester Polytechnic Institute (WPI) Reactor has been replaced with a modern system. The new console maintains the original design bases and functionality while utilizing current technology. An advanced remote monitoring system has been added to augment the educational capabilities of the reactor. Designed and built by General Electric in 1959, the open pool nuclear training reactor at WPI was one of the first such facilities in the nation located on a university campus. Devoted to undergraduatemore » use, the reactor and its related facilities have been since used to train two generations of nuclear engineers and scientists for the nuclear industry. The reactor power level was upgraded from 1 to 10 kill in 1969, and its operating license was renewed for 20 years in 1983. In 1988, the reactor was converted to low enriched uranium. The low power output of the reactor and ergonomic facility design make it an ideal tool for undergraduate nuclear engineering education and other training.« less
Licensed operating reactors: Status summary report data as of December 31, 1991. Volume 16
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1992-03-01
The Nuclear Regulatory Commission`s annual summary of licensed nuclear power reactor data is based primarily on the report of operating data submitted by licensees for each unit for the month of December because that report contains data for the month of December, the year to date (in this case calendar year 1991) and cumulative data, usually from the date of commercial operation. The data is not independently verified, but various computer checks are made. The report is divided into two sections. The first contains summary highlights and the second contains data on each individual unit in commercial operation. Section 1more » capacity and availability factors are simple arithmetic averages. Section 2 items in the cumulative column are generally as reported by the licensee and notes as to the use of weighted averages and starting dates other than commercial operation are provided.« less
Licensed operating reactors. Status summary report data as of 12-31-94: Volume 19
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-04-01
The Nuclear Regulatory Commission`s annual summary of licensed nuclear power reactor data is based primarily on the report of operating data submitted by licensees for each unit for the month of December because that report contains data for the month of December, the year to date (in this case calendar year 1994) and cumulative data, usually from the date of commercial operation. The data is not independently verified, but various computer checks are made. The report is divided into two sections. The first contains summary highlights and the second contains data on each individual unit in commercial operation. Section 1more » capacity and availability factors are simple arithmetic averages. Section 2 items in the cumulative column are generally as reported by the licensee and notes as to the use of weighted averages and starting dates other than commercial operation are provided.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pace, Brenda R.; Williams, Julie B.
2013-11-01
The U. S. Department of Energy (DOE) has a need to test nuclear fuels under conditions that subject them to short bursts of intense, high-power radiation called ‘transient testing’ in order to gain important information necessary for licensing new nuclear fuels for use in U.S. nuclear power plants, for developing information to help improve current nuclear power plant performance and sustainability, for improving the affordability of new generation reactors, for developing recyclable nuclear fuels, and for developing fuels that inhibit any repurposing into nuclear weapons. To meet this mission need, DOE is considering alternatives for re-use and modification of existingmore » nuclear reactor facilities to support a renewed transient testing program. One alternative under consideration involves restarting the Transient Reactor Test (TREAT) reactor located at the Materials and Fuels Complex (MFC) on the Idaho National Laboratory (INL) site in southeastern Idaho. This report summarizes cultural resource investigations conducted by the INL Cultural Resource Management Office in 2013 to support environmental review of activities associated with restarting the TREAT reactor at the INL. These investigations were completed in order to identify and assess the significance of cultural resources within areas of potential effect associated with the proposed action and determine if the TREAT alternative would affect significant cultural resources or historic properties that are eligible for nomination to the National Register of Historic Places. No archaeological resources were identified in the direct area of potential effects for the project, but four of the buildings proposed for modifications are evaluated as historic properties, potentially eligible for nomination to the National Register of Historic Places. This includes the TREAT reactor (building #), control building (building #), guardhouse (building #), and warehouse (building #). The proposed re-use of these historic properties is consistent with original missions related to nuclear reactor testing and is expected to result in no adverse effects to their historic significance. Cultural resource investigations also involved communication with representatives from the Shoshone-Bannock Tribes to characterize cultural resources of potential tribal concern. This report provides a summary of the cultural resources inventoried and assessed within the defined areas of potential effect for the resumption of transient testing at the INL. Based on these analyses, proposed activities would have no adverse effects on historic properties within the APEs that have been defined. Other archaeological resources and cultural resources of potential concern to the Shoshone-Bannock Tribes and others that are located near the APEs are also discussed with regard to potential indirect impacts. The report concludes with general recommendations for measures to reduce impacts to all identified resources.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Grabaskas, David; Bucknor, Matthew; Jerden, James
2016-10-01
The potential release of radioactive material during a plant incident, referred to as the source term, is a vital design metric and will be a major focus of advanced reactor licensing. The U.S. Nuclear Regulatory Commission has stated an expectation for advanced reactor vendors to present a mechanistic assessment of the potential source term in their license applications. The mechanistic source term presents an opportunity for vendors to realistically assess the radiological consequences of an incident, and may allow reduced emergency planning zones and smaller plant sites. However, the development of a mechanistic source term for advanced reactors is notmore » without challenges, as there are often numerous phenomena impacting the transportation and retention of radionuclides. This project sought to evaluate U.S. capabilities regarding the mechanistic assessment of radionuclide release from core damage incidents at metal fueled, pool-type sodium fast reactors (SFRs). The purpose of the analysis was to identify, and prioritize, any gaps regarding computational tools or data necessary for the modeling of radionuclide transport and retention phenomena. To accomplish this task, a parallel-path analysis approach was utilized. One path, led by Argonne and Sandia National Laboratories, sought to perform a mechanistic source term assessment using available codes, data, and models, with the goal to identify gaps in the current knowledge base. The second path, performed by an independent contractor, performed sensitivity analyses to determine the importance of particular radionuclides and transport phenomena in regards to offsite consequences. The results of the two pathways were combined to prioritize gaps in current capabilities.« less
Radioactivity measurements of ITER materials using the TFTR D-T neutron field
NASA Astrophysics Data System (ADS)
Kumar, A.; Abdou, M. A.; Barnes, C. W.; Kugel, H. W.
1994-06-01
The availability of high D-T fusion neutron yields at TFTR has provided a useful opportunity to directly measure D-T neutron-induced radioactivity in a realistic tokamak fusion reactor environment for materials of vital interest to ITER. These measurements are valuable for characterizing radioactivity in various ITER candidate materials, for validating complex neutron transport calculations, and for meeting fusion reactor licensing requirements. The radioactivity measurements at TFTR involve potential ITER materials including stainless steel 316, vanadium, titanium, chromium, silicon, iron, cobalt, nickel, molybdenum, aluminum, copper, zinc, zirconium, niobium, and tungsten. Small samples of these materials were irradiated close to the plasma and just outside the vacuum vessel wall of TFTR, locations of different neutron energy spectra. Saturation activities for both threshold and capture reactions were measured. Data from dosimetric reactions have been used to obtain preliminary neutron energy spectra. Spectra from the first wall were compared to calculations from ITER and to measurements from accelerator-based tests.
Code of Federal Regulations, 2010 CFR
2010-01-01
... sabotage vehicle bomb assault. (i) Land vehicles. Licensees shall: (A) Design, construct, install, and... fuel sabotage against the effects of the design basis threat of radiological sabotage land vehicle bomb...
Status of the NRC Decommissioning Program
DOE Office of Scientific and Technical Information (OSTI.GOV)
Orlando, D. A.; Camper, L.; Buckley, J.
2003-02-24
On July 21, 1997, the U.S. Nuclear Regulatory Commission (NRC) published the final rule on Radiological Criteria for License Termination (the License Termination Rule or LTR) as Subpart E to 10 CFR Part 20. NRC regulations require that materials licensees submit Decommissioning Plans to support the decommissioning of its facility if it is required by license condition, or if the procedures and activities necessary to carry out the decommissioning have not been approved by NRC and these procedures could increase the potential health and safety impacts to the workers or the public. NRC regulations also require that reactor licensees submitmore » Post-shutdown Decommissioning Activities Reports and License Termination Plans to support the decommissioning of nuclear power facilities. This paper provides an update on the status of the NRC's decommissioning program that was presented during WM'02. It discusses the staff's current efforts to streamline the decommissioning process, current issues being faced in the decommissioning program, such as partial site release and restricted release of sites, as well as the status of the decommissioning of complex sites and those listed in the Site Decommissioning Management Plan. The paper discusses the status of permanently shut-down commercial power reactors and the transfer of complex decommissioning sites and sites listed on the SDMP to Agreement States. Finally the paper provides an update of the status of various tools and guidance the NRC is developing to assist licensees during decommissioning, including an effort to consolidate and risk-inform decommissioning guidance.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Neff, Sylvia; Graf, Anja; Petrick, Holger
The compact sodium-cooled nuclear reactor facility Karlsruhe (KNK), a prototype Fast Breeder, is currently in an advanced stage of dismantling. Complete dismantling is based on 10 partial licensing steps. In the frame of the 9. decommissioning permit, which is currently ongoing, the dismantling of the biological shield is foreseen. The biological shield consists of heavy reinforced concrete with built-in steel fitments, such as form-work of the reactor tank, pipe sleeves, ventilation channels, and measuring devices. Due to the activation of the inner part of the biological shield, dismantling has to be done remote-controlled. During a comprehensive basic design phase amore » practical dismantling strategy was developed. Necessary equipment and tools were defined. Preliminary tests revealed that hot wire plasma cutting is the most favorable cutting technology due to the geometrical boundary conditions, the varying distance between cutter and material, and the heavy concrete behind the steel form-work. The cutting devices will be operated remotely via a carrier system with an industrial manipulator. The carrier system has expandable claws to adjust to the varying diameter of the reactor shaft during dismantling progress. For design approval of this prototype development, interaction between manipulator and hot wire plasma cutting was tested in a real configuration. For the demolition of the concrete structure, an excavator with appropriate tools, such as a hydraulic hammer, was selected. Other mechanical cutting devices, such as a grinder or rope saw, were eliminated because of concrete containing steel spheres added to increase the shielding factor of the heavy concrete. Dismantling of the biological shield will be done in a ring-wise manner due to static reasons. During the demolition process, the excavator is positioned on its tripod in three concrete recesses made prior to the dismantling of the separate concrete rings. The excavator and the manipulator carrier system will be operated alternately. Main boundary condition for all the newly designed equipment is the decommissioning housing of limited space within the reactor building containment. To allow for a continuous removal of the concrete rubble, an additional opening on the lowest level of the reactor shaft will be made. All equipment and the interaction of the tools have to be tested before use in the controlled area. Therefore a full-scale model of the biological shield will be provided in a mock-up. The tests will be performed in early 2014. The dismantling of the biological shield is scheduled for 2015. (authors)« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Buchanan, J.R.; Keilholtz, G.W.
This report discusses the current status of liquid-metal fast breeder (LMFBR) development and one of the principal safety issues, a hypothetical core-disruptive accident (HCDA). Bibliographic information on worldwide LMFBRs relative to the development of the breeder reactor as a safe source of nuclear power is presented for the period 1960 through 1969. The bibliography consists of 1560 abstracts covering early research and development and operating experiences leading up to the present design practices that are necessary for the licensing of breeder reactors. Key-word, author, and permuted-title indexes are included for completeness.
NGNP Data Management and Analysis System Analysis and Web Delivery Capabilities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cynthia D. Gentillon
2011-09-01
Projects for the Very High Temperature Reactor (VHTR) Technology Development Office provide data in support of Nuclear Regulatory Commission licensing of the very high temperature reactor. Fuel and materials to be used in the reactor are tested and characterized to quantify performance in high-temperature and high-fluence environments. The NGNP Data Management and Analysis System (NDMAS) at the Idaho National Laboratory has been established to ensure that VHTR data are (1) qualified for use, (2) stored in a readily accessible electronic form, and (3) analyzed to extract useful results. This document focuses on the third NDMAS objective. It describes capabilities formore » displaying the data in meaningful ways and for data analysis to identify useful relationships among the measured quantities. The capabilities are described from the perspective of NDMAS users, starting with those who just view experimental data and analytical results on the INL NDMAS web portal. Web display and delivery capabilities are described in detail. Also the current web pages that show Advanced Gas Reactor, Advanced Graphite Capsule, and High Temperature Materials test results are itemized. Capabilities available to NDMAS developers are more extensive, and are described using a second series of examples. Much of the data analysis efforts focus on understanding how thermocouple measurements relate to simulated temperatures and other experimental parameters. Statistical control charts and correlation monitoring provide an ongoing assessment of instrument accuracy. Data analysis capabilities are virtually unlimited for those who use the NDMAS web data download capabilities and the analysis software of their choice. Overall, the NDMAS provides convenient data analysis and web delivery capabilities for studying a very large and rapidly increasing database of well-documented, pedigreed data.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Qualls, A. L.; Brown, Nicholas R.; Betzler, Benjamin R.
The fluoride salt-cooled high-temperature reactor (FHR) demonstration reactor (DR) is a concept for a salt-cooled reactor with 100 megawatts of thermal output (MWt). It would use tristructural-isotropic (TRISO) particle fuel within prismatic graphite blocks. FLiBe (2 LiF-BeF 2) is the reference primary coolant. The FHR DR is designed to be small, simple, and affordable. Development of the FHR DR is a necessary intermediate step to enable near-term commercial FHRs. Lower risk technologies are purposely included in the initial FHR DR design to ensure that the reactor can be built, licensed, and operated within an acceptable budget and schedule. These technologiesmore » include TRISO particle fuel, replaceable core structural material, the use of that same material for the primary and intermediate loops, and tube-and-shell primary-to-intermediate heat exchangers. Several preconceptual and conceptual design efforts that have been conducted on FHR concepts bear a significant influence on the FHR DR design. Specific designs include the Oak Ridge National Laboratory (ORNL) advanced high-temperature reactor (AHTR) with 3400/1500 MWt/megawatts of electric output (MWe), as well as a 125 MWt small modular AHTR (SmAHTR) from ORNL. Other important examples are the Mk1 pebble bed FHR (PB-FHR) concept from the University of California, Berkeley (UCB), and an FHR test reactor design developed at the Massachusetts Institute of Technology (MIT). The MIT FHR test reactor is based on a prismatic fuel platform and is directly relevant to the present FHR DR design effort. These FHR concepts are based on reasonable assumptions for credible commercial prototypes. The FHR DR concept also directly benefits from the operating experience of the Molten Salt Reactor Experiment (MSRE), as well as the detailed design efforts for a large molten salt reactor concept and its breeder variant, the Molten Salt Breeder Reactor. The FHR DR technology is most representative of the 3400 MWt AHTR concept, and it will demonstrate key operational features of that design. The FHR DR will be closely scaled to the SmAHTR concept in power and flows, so any technologies demonstrated will be directly applicable to a reactor concept of that size. The FHR DR is not a commercial prototype design, but rather a DR that serves a cost and risk mitigation function for a later commercial prototype. It is expected to have a limited operational lifetime compared to a commercial plant. It is designed to be a low-cost reactor compared to more mature advanced prototype DRs. A primary reason to build the FHR DR is to learn about salt reactor technologies and demonstrate solutions to remaining technical gaps.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-06
... associated Safety Evaluation Report (SER) with open items for Hope Creek. The Subcommittee will hear... meetings were published in the Federal Register on October 14, 2009 (74 FR 58268-58269). Detailed meeting...
76 FR 50274 - Terrestrial Environmental Studies for Nuclear Power Stations
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-12
... NUCLEAR REGULATORY COMMISSION [NRC-2011-0182] Terrestrial Environmental Studies for Nuclear Power... draft regulatory guide (DG), DG-4016, ``Terrestrial Environmental Studies for Nuclear Power Stations... environmental studies and analyses supporting licensing decisions for nuclear power reactors. DATES: Submit...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-30
... them to submit a departures report that describes the generic changes and plant-specific departures..., Maryland 20852. FOR FURTHER INFORMATION CONTACT: Anthony Minarik, Office of New Reactors, U.S. Nuclear... advanced [[Page 79504
77 FR 46528 - Sunshine Act Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-03
... Suspend Final Decisions on Reactor License Applications Pending Completion of Remanded Waste Confidence...-nrc/policy-making/schedule.html . * * * * * The NRC provides reasonable accommodation to individuals... Benefits Branch, at 301-415-6200, TDD: 301-415-2100, or by email at [email protected] . Determinations...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-02
... Filled,'' and TS 3.9.5, ``Decay Heat Removal (DHR) and Coolant Circulation--Low Water Level,'' to permit...-approved Dominion Fleet Report DOM-NAF-2- A, ``Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Miller, G.D.; Kukielka, C.A.; Olson, L.M.
The engineering analysis group is responsible for all nuclear plant systems analysis and reactor analysis activities, excluding fuel management analysis, at Pennsylvania Power and Light Company. These activities include making pretest and posttest predictions of startup tests; analyzing unplanned or unexpected transient events; providing technical training to plant personnel; assisting in the development of emergency drill scenarios; providing engineering evaluations to support design and technical specification changes, and evaluating, assessing, and resolving a number of license conditions. Many of these activities have required the direct use of RETRAN models. Two RETRAN analyses that were completed to support plant operations -more » a pretest analysis of the turbine trip startup test, and a posttest analysis of the loss of startup transformer event - are investigated. For each case, RETRAN results are compared with available plant data and comparisons are drawn on the acceptability of the performance of the plant systems.« less
Control console replacement at the WPI Reactor. [Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-12-31
With partial funding from the Department of Energy (DOE) University Reactor Instrumentation Upgrade Program (DOE Grant No. DE-FG02-90ER12982), the original control console at the Worcester Polytechnic Institute (WPI) Reactor has been replaced with a modern system. The new console maintains the original design bases and functionality while utilizing current technology. An advanced remote monitoring system has been added to augment the educational capabilities of the reactor. Designed and built by General Electric in 1959, the open pool nuclear training reactor at WPI was one of the first such facilities in the nation located on a university campus. Devoted to undergraduatemore » use, the reactor and its related facilities have been since used to train two generations of nuclear engineers and scientists for the nuclear industry. The reactor power level was upgraded from 1 to 10 kill in 1969, and its operating license was renewed for 20 years in 1983. In 1988, the reactor was converted to low enriched uranium. The low power output of the reactor and ergonomic facility design make it an ideal tool for undergraduate nuclear engineering education and other training.« less
75 FR 22868 - Withdrawal of Regulatory Guide
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-30
... Characterization of Seismic Sources and Determination of Safe Shutdown Earthquake Ground Motion.'' FOR FURTHER.... Nuclear Regulatory Commission (NRC) is withdrawing RG 1.165, ``Identification and Characterization of... alter the licensing basis of any currently operating reactor or any of the currently issued early site...
Code of Federal Regulations, 2010 CFR
2010-01-01
... LICENSES, INCLUDING HOLDERS OF CERTIFICATES OF COMPLIANCE, REGISTRATIONS, AND QUALITY ASSURANCE PROGRAM...) Remunerated services to other persons; (iii) Distribution of byproduct material, source material, or special... following factors: (1) Age of the reactor; (2) Number of customers in rate base; (3) Net increase in KWh...
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 2 2011-01-01 2011-01-01 false Applicability. 72.13 Section 72.13 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR THE INDEPENDENT STORAGE OF SPENT NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C WASTE General Provisions § 72.13...
10 CFR 72.5 - Interpretations.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 2 2011-01-01 2011-01-01 false Interpretations. 72.5 Section 72.5 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR THE INDEPENDENT STORAGE OF SPENT NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C WASTE General Provisions § 72.5...
10 CFR 72.5 - Interpretations.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Interpretations. 72.5 Section 72.5 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR THE INDEPENDENT STORAGE OF SPENT NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C WASTE General Provisions § 72.5...
10 CFR 52.163 - Administrative review of applications; hearings.
Code of Federal Regulations, 2013 CFR
2013-01-01
... constructing and/or operating the manufactured reactor or an evaluation of alternative energy sources. All... 10 Energy 2 2013-01-01 2013-01-01 false Administrative review of applications; hearings. 52.163 Section 52.163 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS...
10 CFR 52.163 - Administrative review of applications; hearings.
Code of Federal Regulations, 2011 CFR
2011-01-01
... constructing and/or operating the manufactured reactor or an evaluation of alternative energy sources. All... 10 Energy 2 2011-01-01 2011-01-01 false Administrative review of applications; hearings. 52.163 Section 52.163 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS...
10 CFR 52.163 - Administrative review of applications; hearings.
Code of Federal Regulations, 2012 CFR
2012-01-01
... constructing and/or operating the manufactured reactor or an evaluation of alternative energy sources. All... 10 Energy 2 2012-01-01 2012-01-01 false Administrative review of applications; hearings. 52.163 Section 52.163 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS...
10 CFR 52.163 - Administrative review of applications; hearings.
Code of Federal Regulations, 2014 CFR
2014-01-01
... constructing and/or operating the manufactured reactor or an evaluation of alternative energy sources. All... 10 Energy 2 2014-01-01 2014-01-01 false Administrative review of applications; hearings. 52.163 Section 52.163 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS...
10 CFR 52.163 - Administrative review of applications; hearings.
Code of Federal Regulations, 2010 CFR
2010-01-01
... constructing and/or operating the manufactured reactor or an evaluation of alternative energy sources. All... 10 Energy 2 2010-01-01 2010-01-01 false Administrative review of applications; hearings. 52.163 Section 52.163 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS...
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Applicability. 72.13 Section 72.13 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR THE INDEPENDENT STORAGE OF SPENT NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C WASTE General Provisions § 72.13...
10 CFR 72.28 - Contents of application: Applicant's technical qualifications.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Contents of application: Applicant's technical qualifications. 72.28 Section 72.28 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR THE INDEPENDENT STORAGE OF SPENT NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED...
10 CFR 72.90 - General considerations.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false General considerations. 72.90 Section 72.90 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR THE INDEPENDENT STORAGE OF SPENT NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C WASTE Siting Evaluation Factors...
75 FR 48382 - Draft Regulatory Guide: Issuance, Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-10
... NUCLEAR REGULATORY COMMISSION [NRC-2010-0275] Draft Regulatory Guide: Issuance, Availability AGENCY: Nuclear Regulatory Commission. ACTION: Notice of Issuance and Availability of Draft Regulatory Guide, DG-1228, ``Standard Format and Content of License Termination Plans for Nuclear Power Reactors.'' FOR FURTHER INFORMATION CONTACT: James C....
10 CFR 55.59 - Requalification.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 2 2014-01-01 2014-01-01 false Requalification. 55.59 Section 55.59 Energy NUCLEAR... reactor startups to include a range that reactivity feedback from nuclear heat addition is noticeable and... outside containment). (AA) A nuclear instrumentation failure. (ii) Each licensed operator and senior...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-23
... image files of the NRC's public documents. If you do not have access to ADAMS or if there are problems.... Stephen J. Campbell, Chief, Watts Bar Special Projects Branch, Division of Operating Reactor Licensing...
Code of Federal Regulations, 2011 CFR
2011-01-01
... the case of fuel cycle facilities where nuclear reactor fuel is fabricated or processed each licensee... 10 Energy 2 2011-01-01 2011-01-01 false Inspections. 70.55 Section 70.55 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DOMESTIC LICENSING OF SPECIAL NUCLEAR MATERIAL Special Nuclear Material Control...
Code of Federal Regulations, 2012 CFR
2012-01-01
... the case of fuel cycle facilities where nuclear reactor fuel is fabricated or processed each licensee... 10 Energy 2 2012-01-01 2012-01-01 false Inspections. 70.55 Section 70.55 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DOMESTIC LICENSING OF SPECIAL NUCLEAR MATERIAL Special Nuclear Material Control...
Code of Federal Regulations, 2013 CFR
2013-01-01
... the case of fuel cycle facilities where nuclear reactor fuel is fabricated or processed each licensee... 10 Energy 2 2013-01-01 2013-01-01 false Inspections. 70.55 Section 70.55 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DOMESTIC LICENSING OF SPECIAL NUCLEAR MATERIAL Special Nuclear Material Control...
Code of Federal Regulations, 2010 CFR
2010-01-01
... the case of fuel cycle facilities where nuclear reactor fuel is fabricated or processed each licensee... 10 Energy 2 2010-01-01 2010-01-01 false Inspections. 70.55 Section 70.55 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DOMESTIC LICENSING OF SPECIAL NUCLEAR MATERIAL Special Nuclear Material Control...
Code of Federal Regulations, 2014 CFR
2014-01-01
... the case of fuel cycle facilities where nuclear reactor fuel is fabricated or processed each licensee... 10 Energy 2 2014-01-01 2014-01-01 false Inspections. 70.55 Section 70.55 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DOMESTIC LICENSING OF SPECIAL NUCLEAR MATERIAL Special Nuclear Material Control...
Analysis of decommissioning costs for the AFRRI TRIGA reactor facility. Technical report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Forsbacka, M.; Moore, M.
1989-12-01
This report provides a cost analysis for decommissioning the Armed Forces Radiobiology Research Institute (AFRRI) TRIGA reactor facility. AFRRI is not suggesting that the AFRRI TRIGA reactor facility be decommissioned. This report was prepared in compliance with paragraph 50.33 of Title 10, Code of Federal Regulations, which requires that funding for the decommissioning of reactor facilities be available when licensed activities cease. The planned method of decommissioning is complete decontamination (DECON) of the AFRRI TRIGA reactor site to allow for restoration of the site to full public access. The cost of DECON in 1990 dollars is estimated to be $3,200,000.more » The anticipated ancillary costs of facility site demobilization and spent fuel shipment will be an additional $600,000. Thus, the total cost of terminating reactor operations at AFRRI will be about $3,800,000. The primary basis for developing this cost estimate was a study of the decommissioning costs of similar reactor facility performed by Battelle Pacific Northwest Laboratory, as provided in U.S. Nuclear Regulatory Commission publication NUREG/CR-1756. The data in this study were adapted to reflect the decommissioning requirements of the AFRRI TRIGA reactor facility.« less
Laboratory instrumentation modernization at the WPI Nuclear Reactor Facility
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1995-01-01
With partial funding from the Department of Energy (DOE) University Reactor Instrumentation Program several laboratory instruments utilized by students and researchers at the WPI Nuclear Reactor Facility have been upgraded or replaced. Designed and built by General Electric in 1959, the open pool nuclear training reactor at WPI was one of the first such facilities in the nation located on a university campus. Devoted to undergraduate use, the reactor and its related facilities have been since used to train two generations of nuclear engineers and scientists for the nuclear industry. The low power output of the reactor and an ergonomicmore » facility design make it an ideal tool for undergraduate nuclear engineering education and other training. The reactor, its control system, and the associate laboratory equipment are all located in the same room. Over the years, several important milestones have taken place at the WPI reactor. In 1969, the reactor power level was upgraded from 1 kW to 10 kW. The reactor`s Nuclear Regulatory Commission operating license was renewed for 20 years in 1983. In 1988, under DOE Grant No. DE-FG07-86ER75271, the reactor was converted to low-enriched uranium fuel. In 1992, again with partial funding from DOE (Grant No. DE-FG02-90ER12982), the original control console was replaced.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rutherford, Phil; Samuels, Sandy; Lee, Majelle
2001-09-01
This Annual Site Environmental Report (ASER) for 2000 describes the environmental conditions related to work performed for the Department of Energy (DOE) at Area IV of the Rocketdyne Santa Susana Field Laboratory (SSFL). In the past, these operations included development, fabrication, and disassembly of nuclear reactors, reactor fuel, and other radioactive materials, under the former Atomics International (AI) Division. Other activities included the operation of large-scale liquid metal facilities for testing of liquid metal fast breeder components at the Energy Technology Engineering Center (ETEC), a government-owned company-operated, test facility within Area IV. All nuclear work was terminated in 1988, andmore » subsequently, all radiological work has been directed toward decontamination and decommissioning (D&D) of the previously used nuclear facilities and associated site areas. Large-scale D&D activities of the sodium test facilities began in 1996. Results of the radiological monitoring program for the calendar year of 2000 continue to indicate no significant releases of radioactive material from Rocketdyne sites. All potential exposure pathways are sampled and/or monitored, including air, soil, surface water, groundwater, direct radiation, transfer of property (land, structures, waste), and recycling. All radioactive wastes are processed for disposal at DOE disposal sites and other sites approved by DOE and licensed for radioactive waste. Liquid radioactive wastes are not released into the environment and do not constitute an exposure pathway.« less
76 FR 5218 - Advisory Committee on Reactor Safeguards
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-28
..., October 21, 2010 (74 FR 65038-65039). Thursday, February 10, 2011, Conference Room T2-B1, 11545 Rockville... Evaluation Report Associated with the License Renewal Application for the Palo Verde Nuclear Generating... NRC staff and Arizona Public Service Company regarding the final Safety Evaluation Report associated...
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 1 2010-01-01 2010-01-01 false Purpose. 2.1101 Section 2.1101 Energy NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING PROCEEDINGS AND ISSUANCE OF ORDERS Hybrid Hearing Procedures for Expansion of Spent Nuclear Fuel Storage Capacity at Civilian Nuclear Power Reactors § 2.1101...
10 CFR 72.9 - Information collection requirements: OMB approval.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 2 2011-01-01 2011-01-01 false Information collection requirements: OMB approval. 72.9 Section 72.9 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR THE INDEPENDENT STORAGE OF SPENT NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C...
10 CFR 2.1113 - Oral argument.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 1 2010-01-01 2010-01-01 false Oral argument. 2.1113 Section 2.1113 Energy NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING PROCEEDINGS AND ISSUANCE OF ORDERS Hybrid Hearing Procedures for Expansion of Spent Nuclear Fuel Storage Capacity at Civilian Nuclear Power Reactors...
10 CFR 72.26 - Contents of application: Technical specifications.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 2 2011-01-01 2011-01-01 false Contents of application: Technical specifications. 72.26 Section 72.26 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR THE INDEPENDENT STORAGE OF SPENT NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C...
10 CFR 72.7 - Specific exemptions.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 2 2011-01-01 2011-01-01 false Specific exemptions. 72.7 Section 72.7 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR THE INDEPENDENT STORAGE OF SPENT NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C WASTE General Provisions § 72.7...
10 CFR 72.9 - Information collection requirements: OMB approval.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Information collection requirements: OMB approval. 72.9 Section 72.9 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR THE INDEPENDENT STORAGE OF SPENT NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C...
10 CFR 72.7 - Specific exemptions.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Specific exemptions. 72.7 Section 72.7 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR THE INDEPENDENT STORAGE OF SPENT NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C WASTE General Provisions § 72.7...
10 CFR 72.30 - Financial assurance and recordkeeping for decommissioning.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Financial assurance and recordkeeping for decommissioning. 72.30 Section 72.30 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR THE INDEPENDENT STORAGE OF SPENT NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN...
10 CFR 72.70 - Safety analysis report updating.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Safety analysis report updating. 72.70 Section 72.70 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR THE INDEPENDENT STORAGE OF SPENT NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C WASTE Records...
10 CFR 72.26 - Contents of application: Technical specifications.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Contents of application: Technical specifications. 72.26 Section 72.26 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR THE INDEPENDENT STORAGE OF SPENT NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-10
... Technical Specification (TS) 3.4.5, ``RCS Leakage Detection Instrumentation,'' consistent with the NRC... monitoring system are the only operable reactor coolant leakage detection monitoring systems. The modified... Coolant System] Leakage Instrumentation,'' Revision 3. The availability of this TS improvement was...
10 CFR 2.1113 - Oral argument.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 1 2011-01-01 2011-01-01 false Oral argument. 2.1113 Section 2.1113 Energy NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING PROCEEDINGS AND ISSUANCE OF ORDERS Hybrid Hearing Procedures for Expansion of Spent Nuclear Fuel Storage Capacity at Civilian Nuclear Power Reactors...
10 CFR 50.54 - Conditions of licenses.
Code of Federal Regulations, 2011 CFR
2011-01-01
... denote the position function, supplemented as necessary by descriptive text, rather than specific titles... responsibilities, or, alternately, the use of descriptive text; (v) The elimination of quality assurance program... requirements in appendix E of this part. A licensee authorized to possess and/or operate a research reactor or...
Code of Federal Regulations, 2010 CFR
2010-01-01
..., review of standard referenced design approvals, special projects, inspections and import and export... standard referenced design approvals, special projects, inspections and import and export licenses..., approvals of facility standard reference designs, re-qualification and replacement examinations for reactor...
Code of Federal Regulations, 2014 CFR
2014-01-01
..., review of standard referenced design approvals, special projects, inspections and import and export... standard referenced design approvals, special projects, inspections and import and export licenses..., approvals of facility standard reference designs, re-qualification and replacement examinations for reactor...
Code of Federal Regulations, 2013 CFR
2013-01-01
..., review of standard referenced design approvals, special projects, inspections and import and export... standard referenced design approvals, special projects, inspections and import and export licenses..., approvals of facility standard reference designs, re-qualification and replacement examinations for reactor...
Code of Federal Regulations, 2011 CFR
2011-01-01
..., review of standard referenced design approvals, special projects, inspections and import and export... standard referenced design approvals, special projects, inspections and import and export licenses..., approvals of facility standard reference designs, re-qualification and replacement examinations for reactor...
10 CFR 72.11 - Completeness and accuracy of information.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 2 2013-01-01 2013-01-01 false Completeness and accuracy of information. 72.11 Section 72.11 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR THE INDEPENDENT STORAGE OF SPENT NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C...
10 CFR 72.11 - Completeness and accuracy of information.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 2 2014-01-01 2014-01-01 false Completeness and accuracy of information. 72.11 Section 72.11 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR THE INDEPENDENT STORAGE OF SPENT NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C...
10 CFR 72.78 - Nuclear material transaction reports.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 2 2014-01-01 2014-01-01 false Nuclear material transaction reports. 72.78 Section 72.78 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR THE INDEPENDENT STORAGE OF SPENT NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C WASTE Records...
10 CFR 72.11 - Completeness and accuracy of information.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 2 2012-01-01 2012-01-01 false Completeness and accuracy of information. 72.11 Section 72.11 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR THE INDEPENDENT STORAGE OF SPENT NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C...
10 CFR 72.78 - Nuclear material transaction reports.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 2 2012-01-01 2012-01-01 false Nuclear material transaction reports. 72.78 Section 72.78 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR THE INDEPENDENT STORAGE OF SPENT NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C WASTE Records...
10 CFR 72.78 - Nuclear material transaction reports.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 2 2011-01-01 2011-01-01 false Nuclear material transaction reports. 72.78 Section 72.78 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR THE INDEPENDENT STORAGE OF SPENT NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C WASTE Records...
10 CFR 72.78 - Nuclear material transaction reports.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 2 2013-01-01 2013-01-01 false Nuclear material transaction reports. 72.78 Section 72.78 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR THE INDEPENDENT STORAGE OF SPENT NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C WASTE Records...
10 CFR 72.11 - Completeness and accuracy of information.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 2 2011-01-01 2011-01-01 false Completeness and accuracy of information. 72.11 Section 72.11 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR THE INDEPENDENT STORAGE OF SPENT NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C...
10 CFR 72.11 - Completeness and accuracy of information.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Completeness and accuracy of information. 72.11 Section 72.11 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR THE INDEPENDENT STORAGE OF SPENT NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C...
10 CFR 51.95 - Postconstruction environmental impact statements.
Code of Federal Regulations, 2011 CFR
2011-01-01
... the storage of spent fuel for the nuclear power plant within the scope of the generic determination in... a license to store spent fuel at a nuclear power reactor after expiration of the operating or... Section 51.95 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR...
10 CFR 51.95 - Postconstruction environmental impact statements.
Code of Federal Regulations, 2012 CFR
2012-01-01
... the storage of spent fuel for the nuclear power plant within the scope of the generic determination in... a license to store spent fuel at a nuclear power reactor after expiration of the operating or... Section 51.95 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR...