46 CFR 95.16-60 - System piping installation testing.
Code of Federal Regulations, 2012 CFR
2012-10-01
... VESSELS FIRE PROTECTION EQUIPMENT Fixed Clean Agent Gas Extinguishing Systems, Details § 95.16-60 System piping installation testing. (a) Halocarbon systems. A pressure test using the extinguishing agent, air... installation and before extinguishing agent cylinders are connected. (1) Except as otherwise specified in this...
46 CFR 95.16-60 - System piping installation testing.
Code of Federal Regulations, 2013 CFR
2013-10-01
... VESSELS FIRE PROTECTION EQUIPMENT Fixed Clean Agent Gas Extinguishing Systems, Details § 95.16-60 System piping installation testing. (a) Halocarbon systems. A pressure test using the extinguishing agent, air... installation and before extinguishing agent cylinders are connected. (1) Except as otherwise specified in this...
46 CFR 95.16-60 - System piping installation testing.
Code of Federal Regulations, 2014 CFR
2014-10-01
... VESSELS FIRE PROTECTION EQUIPMENT Fixed Clean Agent Gas Extinguishing Systems, Details § 95.16-60 System piping installation testing. (a) Halocarbon systems. A pressure test using the extinguishing agent, air... installation and before extinguishing agent cylinders are connected. (1) Except as otherwise specified in this...
DOT National Transportation Integrated Search
1978-03-01
This report deals with the selection of a test site, the design of a test installation, equipment selection, the installation and start-up of a pneumatic pipeline system for the transportation of tunnel muck. A review of prior pneumatic applications ...
An Automatic System of Testing the Best Stress of Installation for Semiconductor Refrigeration Piece
NASA Astrophysics Data System (ADS)
Chen, Hongyan; Song, Ping
Concerning the problems of the impact on the factors of installation about semiconductor refrigeration piece are rarely studied in China and abroad, a reasonable structure of test device is designed, using stepper motor to test the temperature of the cold surface under different stress of installation to get the best stress of installation for the semiconductor refrigeration piece. Experiments shows that the system is of good noise immunity, high controlling and measuring precision.
NASA Technical Reports Server (NTRS)
2010-01-01
A structural steel beam to support the new thrust measurement system on the A-1 Test Stand at NASA's John C. Stennis Space Center is lifted to waiting employees for installation. The beam is part of the thrust takeout structure needed to support the new measurement system. Four such beams have been installed at the stand in preparation for installation of the system in upcoming weeks. Operators are preparing the stand for testing the next generation of rocket engines for the U.S. space program.
Evaluation of Cable Harness Post-Installation Testing. Part B
NASA Technical Reports Server (NTRS)
King, M. S.; Iannello, C. J.
2011-01-01
The Cable Harness Post-Installation Testing Report was written in response to an action issued by the Ares Project Control Board (PCB). The action for the Ares I Avionics & Software Chief Engineer and the Avionics Integration and Vehicle Systems Test Work Breakdown Structure (WBS) Manager in the Vehicle Integration Office was to develop a set of guidelines for electrical cable harnesses. Research showed that post-installation tests have been done since the Apollo era. For Ares I-X, the requirement for post-installation testing was removed to make it consistent with the avionics processes used on the Atlas V expendable launch vehicle. Further research for the report involved surveying government and private sector launch vehicle developers, military and commercial aircraft, spacecraft developers, and harness vendors. Responses indicated crewed launch vehicles and military aircraft perform post-installation tests. Key findings in the report were as follows: Test requirements identify damage, human-rated vehicles should be tested despite the identification of statistically few failures, data does not support the claim that post-installation testing damages the harness insulation system, and proper planning can reduce overhead associated with testing. The primary recommendation of the report is for the Ares projects to retain the practice of post-fabrication and post-installation cable harness testing.
46 CFR 56.97-40 - Installation tests.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 2 2012-10-01 2012-10-01 false Installation tests. 56.97-40 Section 56.97-40 Shipping... APPURTENANCES Pressure Tests § 56.97-40 Installation tests. (a) The following piping systems shall be... on initial service leak test, § 56.97-38. [CGFR 68-82, 33 FR 18843, Dec. 18, 1968, as amended by CGFR...
TMS installation at A-1 Test Stand
2010-03-03
A new thrust measurement system is lifted onto the A-1 Test Stand deck at NASA's John C. Stennis Space Center in preparation for its installation. The new system is a state-of-the-art upgrade for the testing structure, which is being prepared for testing of next-generation rocket engines. The system was fabricated by Thrust Measurement Systems in Illinois at a cost of about $3.5 million.
Construction quality assurance report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Roscha, V.
1994-09-08
This report provides a summary of the construction quality assurance (CQA) observation and test results, including: The results of the geosynthetic and soil materials conformance testing. The observation and testing results associates with the installation of the soil liners. The observation and testing results associated with the installation of the HDPE geomembrane liner systems. The observation and testing results associated with the installation of the leachate collection and removal systems. The observation and testing results associated with the installation of the working surfaces. The observation and testing results associated with in-plant manufacturing process. Summary of submittal reviews by Golder Constructionmore » Services, Inc. The submittal and certification of the piping material specifications. The observation and verification associated of the Acceptance Test Procedure results of the operational equipment functions. Summary of the ECNs which are incorporated into the project.« less
46 CFR 56.97-40 - Installation tests.
Code of Federal Regulations, 2010 CFR
2010-10-01
... attached to boilers by welding without practical means of blanking off for testing, the piping shall be...) Fixed oxygen-acetylene system piping. (b) Installation testing requirements for refrigeration, fluid...
Space Launch System Integrated Structural Test b-roll
2017-04-19
Integrated Structural Test at test stand 4699 at Marshall Space Flight Center: 1. Launch Vehicle Stage Adapter (LVSA) install to 4699 - 00:05 2. Interim Cryogenic Propulsion stage (ICPS) install to 4699 00:20 3. Orion Stage Adapter (OSA) install to 4699 00:56 4. Integrated Structural Test control room 01:10 5. Animation of stacking LVSA, ICPS & OSA in test stand 02:46
Solar heating and cooling system design and development
NASA Technical Reports Server (NTRS)
1979-01-01
The design and development of marketable solar heating and cooling systems for single family and commercial applications is described. The delivery, installation, and monitoring of the prototype systems are discussed. Seven operational test sites are discussed in terms of system performance. Problems encountered with equipment and installation were usually due to lack of skills required for solar system installation.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dietrich, Richard E.
2016-07-01
This document serves as the System-Level Acceptance Test (SLAT) Plan for Site Name, City, Country. This test plan is to provide independent testing of the Radiation Detection System (RDS) installed at Site Name to verify that Customs has been delivered a fully-functioning system as required by all contractual commitments. The system includes all installed hardware and software components. The SLAT plan will verify that separate components are working individually and collectively from a system perspective.
38 CFR 17.74 - Standards applicable to medical foster homes.
Code of Federal Regulations, 2014 CFR
2014-07-01
... detectors, and all other elements of a fire alarm system, must be inspected, tested, and maintained in... § 17.1). (h) Sprinkler systems. (1) If a sprinkler system is installed, it must be inspected, tested... sprinkler system is installed in accordance with NFPA 13D (incorporated by reference, see § 17.1). If a...
38 CFR 17.74 - Standards applicable to medical foster homes.
Code of Federal Regulations, 2013 CFR
2013-07-01
... detectors, and all other elements of a fire alarm system, must be inspected, tested, and maintained in... § 17.1). (h) Sprinkler systems. (1) If a sprinkler system is installed, it must be inspected, tested... sprinkler system is installed in accordance with NFPA 13D (incorporated by reference, see § 17.1). If a...
Digital control for the condensate system in a combined cycle power plant
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sanchez Parra, M.; Fuentes Gutierrez, J.E.; Castelo Cuevas, L.
1994-12-31
This paper presents the highlights by means of which development, installation and start up of the digital control system (DCS)for the condenser and hotwell (condensate system) were performed. This system belongs to the distributed control system installed by the Instituto de Investigaciones Electricas (IIE) at the Combined Cycle Power Plant in Gomez Palacio (GP), Durango, Mexico, during the February-March period, in 1993. The main steps for development of the condenser and hotwell control system include: process modeling, definition of control strategies, algorithms, design and software development, PC simulation tests, laboratory tests with an equipment similar to the one installed atmore » the GP Power Plant, installation, and finally, start up, which was a joint effort with the GP Power Plant engineering staff.« less
Hot Cell Installation and Demonstration of the Severe Accident Test Station
DOE Office of Scientific and Technical Information (OSTI.GOV)
Linton, Kory D.; Burns, Zachary M.; Terrani, Kurt A.
A Severe Accident Test Station (SATS) capable of examining the oxidation kinetics and accident response of irradiated fuel and cladding materials for design basis accident (DBA) and beyond design basis accident (BDBA) scenarios has been successfully installed and demonstrated in the Irradiated Fuels Examination Laboratory (IFEL), a hot cell facility at Oak Ridge National Laboratory. The two test station modules provide various temperature profiles, steam, and the thermal shock conditions necessary for integral loss of coolant accident (LOCA) testing, defueled oxidation quench testing and high temperature BDBA testing. The installation of the SATS system restores the domestic capability to examinemore » postulated and extended LOCA conditions on spent fuel and cladding and provides a platform for evaluation of advanced fuel and accident tolerant fuel (ATF) cladding concepts. This document reports on the successful in-cell demonstration testing of unirradiated Zircaloy-4. It also contains descriptions of the integral test facility capabilities, installation activities, and out-of-cell benchmark testing to calibrate and optimize the system.« less
46 CFR 115.702 - Installation tests and inspections.
Code of Federal Regulations, 2013 CFR
2013-10-01
... CERTIFICATION Repairs and Alterations § 115.702 Installation tests and inspections. Whenever a launching appliance, survival craft, rescue boat, fixed gas fire extinguishing system, machinery, fuel tank, or...
46 CFR 115.702 - Installation tests and inspections.
Code of Federal Regulations, 2014 CFR
2014-10-01
... CERTIFICATION Repairs and Alterations § 115.702 Installation tests and inspections. Whenever a launching appliance, survival craft, rescue boat, fixed gas fire extinguishing system, machinery, fuel tank, or...
46 CFR 115.702 - Installation tests and inspections.
Code of Federal Regulations, 2012 CFR
2012-10-01
... CERTIFICATION Repairs and Alterations § 115.702 Installation tests and inspections. Whenever a launching appliance, survival craft, rescue boat, fixed gas fire extinguishing system, machinery, fuel tank, or...
46 CFR 115.702 - Installation tests and inspections.
Code of Federal Regulations, 2011 CFR
2011-10-01
... CERTIFICATION Repairs and Alterations § 115.702 Installation tests and inspections. Whenever a launching appliance, survival craft, rescue boat, fixed gas fire extinguishing system, machinery, fuel tank, or...
46 CFR 115.702 - Installation tests and inspections.
Code of Federal Regulations, 2010 CFR
2010-10-01
... CERTIFICATION Repairs and Alterations § 115.702 Installation tests and inspections. Whenever a launching appliance, survival craft, rescue boat, fixed gas fire extinguishing system, machinery, fuel tank, or...
Development of a simple, self-contained flight test data acquisition system
NASA Technical Reports Server (NTRS)
Clarke, R.; Shane, D.; Roskam, J.; Rummer, D. I.
1982-01-01
The flight test system described combines state-of-the-art microprocessor technology and high accuracy instrumentation with parameter identification technology which minimize data and flight time requirements. The system was designed to avoid permanent modifications of the test airplane and allow quick installation. It is capable of longitudinal and lateral-directional stability and control derivative estimation. Details of this system, calibration and flight test procedures, and the results of the Cessna 172 flight test program are presented. The system proved easy to install, simple to operate, and capable of accurate estimation of stability and control parameters in the Cessna 172 flight tests.
Measure Guideline: Combined Space and Water Heating Installation and Optimization
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schoenbauer, B.; Bohac, D.; Huelman, P.
Combined space and water heater (combi or combo) systems are defined by their dual functionality. Combi systems provide both space heating and water heating capabilities with a single heat source. This guideline will focus on the installation and operation of residential systems with forced air heating and domestic hot water (DHW) functionality. Past NorthernSTAR research has used a combi system to replace a natural gas forced air distribution system furnace and tank type water heater (Schoenbauer et al. 2012; Schoenbauer, Bohac, and McAlpine 2014). The combi systems consisted of a water heater or boiler heating plant teamed with a hydronicmore » air handler that included an air handler, water coil, and water pump to circulate water between the heating plant and coil. The combi water heater or boiler had a separate circuit for DHW. Past projects focused on laboratory testing, field characterization, and control optimization of combi systems. Laboratory testing was done to fully characterize and test combi system components; field testing was completed to characterize the installed performance of combi systems; and control methodologies were analyzed to understand the potential of controls to simplify installation and design and to improve system efficiency and occupant comfort. This past work was relied upon on to create this measure guideline.« less
Practical aspects of instrumentation system installation, volume 13
NASA Technical Reports Server (NTRS)
Borek, R. W.; Pool, A. (Editor); Sanderson, K. C. (Editor)
1981-01-01
A review of factors influencing installation of aircraft flight test instrumentation is presented. Requirements, including such factors as environment, reliability, maintainability, and system safety are discussed. The assessment of the mission profile is followed by an overview of electrical and mechanical installation factors with emphasis on shock/vibration isolation systems and standardization of the electric wiring installation, two factors often overlooked by instrumentation engineers. A discussion of installation hardware reviews the performance capabilities of wiring, connectors, fuses and circuit breakers, and a guide to proper selections is provided. The discussion of the installation is primarily concerned with the electrical wire routing, shield terminations and grounding. Also inclued are some examples of installation mistakes that could affect system accuracy. System verification procedures and special considerations such as sneak circuits, pyrotechnics, aircraft antenna patterns, and lightning strikes are discussed.
SIMS prototype system 4 - performance test report
NASA Technical Reports Server (NTRS)
1978-01-01
A self-contained, preassembled air type solar system, designed for installation remote from the dwelling, to provide space heating and hot water was evaluated. Data analysis is included which documents the system performance and verifies its suitability for field installation.
46 CFR 58.10-15 - Gas turbine installations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-15 Gas turbine installations. (a) Standards. The design, construction, workmanship and tests of gas turbines and their associated... 46 Shipping 2 2010-10-01 2010-10-01 false Gas turbine installations. 58.10-15 Section 58.10-15...
46 CFR 58.10-15 - Gas turbine installations.
Code of Federal Regulations, 2011 CFR
2011-10-01
... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-15 Gas turbine installations. (a) Standards. The design, construction, workmanship and tests of gas turbines and their associated... 46 Shipping 2 2011-10-01 2011-10-01 false Gas turbine installations. 58.10-15 Section 58.10-15...
Temperature measurement using infrared imaging systems during turbine engine altitude testing
NASA Technical Reports Server (NTRS)
Burns, Maureen E.
1994-01-01
This report details the use of infrared imaging for temperature measurement and thermal pattern determination during simulated altitude engine testing in the NASA Lewis Propulsion Systems Laboratory. Three identical argon-cooled imaging systems were installed in the facility exhaust collector behind sapphire windows to look at engine internal surfaces. The report describes the components of each system, presents the specifics of the complicated installation, and explains the operation of the systems during engine testing. During the program, several problems emerged, such as argon contamination system, component overheating, cracked sapphire windows, and other unexplained effects. This report includes a summary of the difficulties as well as the solutions developed. The systems performed well, considering they were in an unusually harsh exhaust environment. Both video and digital data were recorded, and the information provided valuable material for the engineers and designers to quickly make any necessary design changes to the engine hardware cooling system. The knowledge and experience gained during this program greatly simplified the installation and use of the systems during later test programs in the facility. The infrared imaging systems have significantly enhanced the measurement capabilities of the facility, and have become an outstanding and versatile testing resource in the Propulsion Systems Laboratory.
Installation and Test of Doppler Acoustic Sensor
DOT National Transportation Integrated Search
1977-12-01
This report presents details of the installation of a Doppler acoustic vortex sensing system at JFK Runway 31R, the hardware and software improvements made since installation, vortex diagnostic and tracking data and analysis, and conclusions and reco...
Fabrication of a glycerol from CO2 reaction system, supplement
NASA Technical Reports Server (NTRS)
Weiss, A. H.
1973-01-01
The fabrication, installation, and testing of a glycerol hydrogenation and a CO2 hydrogenation - CH4 partial oxidation units are reported. The glycerol system proved to be operational while the CO2 system was installed but not bought on operational steam.
2011-03-15
Lone Eagle Street Columbus Ohio 43228 Installation trades personnel 5/7/2009 12:00:00AM 10/31/2010 12:00:00AM Sub Contractor Numbers (c): Patent...43026-2573 Pipe fitter installation trades personnel. 10/21/2009 12:00:00AM 1/31/2011 12:00:00AM Sub Contractor Numbers (c): Patent Clause Number...City Electric Company 1099 Sullivant Avenue Columbus Ohio 43223 Electrical installation trades personnel 4/5/2009 12:00:00AM 9/30/2010 12:00:00AM
Photovoltaic-Powered Vaccine Refrigerator: Freezer Systems Field Test Results
NASA Technical Reports Server (NTRS)
Ratajczak, A. F.
1985-01-01
A project to develop and field test photovoltaic-powered refrigerator/freezers suitable for vaccine storage was undertaken. Three refrigerator/freezers were qualified; one by Solar Power Corp. and two by Solvolt. Follow-on contracts were awarded for 19 field test systems and for 10 field test systems. A total of 29 systems were installed in 24 countries between October 1981 and October 1984. The project, systems descriptions, installation experiences, performance data for the 22 systems for which field test data was reported, an operational reliability summary, and recommendations relative to system designs and future use of such systems are explained. Performance data indicate that the systems are highly reliable and are capable of maintaining proper vaccine storage temperatures in a wide range of climatological and user environments.
Performance and Health Test Procedure for Grid Energy Storage Systems: Preprint
DOE Office of Scientific and Technical Information (OSTI.GOV)
Baggu, Murali M; Smith, Kandler A; Friedl, Andrew
A test procedure to evaluate the performance and health of field installations of grid-connected battery energy storage systems (BESS) is described. Performance and health metrics captured in the procedures are: Round-trip efficiency, Standby losses, Response time/accuracy, and Useable Energy/ State of Charge at different discharge/charge rates over the system's lifetime. The procedures are divided into Reference Performance Tests, which require the system to be put in a test mode and are to be conducted in intervals, and Real-time Monitoring tests, which collect data during normal operation without interruption. The procedures can be applied on a wide array of BESS withmore » little modifications and can thus support BESS operators in the management of BESS field installations with minimal interruption and expenditures.can be applied on a wide array of BESS with little modifications and can thus support BESS operators in the management of BESS field installations with minimal interruption and expenditures.« less
Code of Federal Regulations, 2010 CFR
2010-10-01
... equipment must be tested and inspected to verify their proper design, construction, installation, and operation. (d) All tests must be performed after installation of the automatic auxiliary boiler and its... monitored system conditions by misadjustment, artificial signals, improper wiring, tampering, or revision of...
ICPSU Install at Mobile Launcher
2018-03-14
A colorful sunrise serves as the backdrop for the mobile launcher (ML) at NASA's Kennedy Space Center in Florida. Several launch umbilicals have been installed on the ML tower. Exploration Ground Systems is overseeing installation of umbilicals and launch accessories on the ML to prepare for the first integrated test flight of the Orion spacecraft on the agency's Space Launch System rocket on Exploration Mission-1.
Spectrum Management Guidelines for National and Service Test and Training Ranges
2017-07-12
GPS Global Positioning System ISM Installation Spectrum Manager JTIDS Joint Tactical Information Distribution System KMR Kwajalein Missile Range... information UAV unmanned aerial vehicle US&P United States and Possessions Spectrum Management Guidelines for National and Service Test and Training...frequency deconfliction processes. The AFC will inform the range or center commander and the Installation Spectrum Manager (ISM) at the
Truss-Integrated Thermoformed Ductwork Final Technical Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Steven Winter; Dianne Griffiths; Ravi Gorthala
2007-08-30
This report summarizes a multi-year research effort to develop a leak-free duct system that can be readily installed within the thermal envelope. There are numerous efforts underway to improve duct system efficiency. Most of these involve modifications to current technology such as air sealing techniques like mastic and aeroseal, snap together duct connections, and greater levels of insulation. This project sought to make a more significant stride forward by introducing a duct system of a material that can be more readily sealed and can exhibit lower friction losses. The research focused on the use of smooth internal surface, low frictionmore » plastic ducts that could be easily installed with very low air leakage. The initial system concept that was proposed and researched in Phase I focused on the use of thermoformed plastic ducts installed in a recessed roof truss underneath the attic insulation. A bench top thermoformed system was developed and tested during Phase I of the project. In Phase II, a first generation duct system utilizing a resin impregnated fiberglass duct product was designed and specified. The system was installed and tested in an Atlanta area home. Following this installation research and correspondence with code officials was undertaken to alleviate the continued concern over the code acceptance of plastic ducts in above ground applications. A Committee Interpretation response was received from the International Code Council (ICC) stating that plastic ducts were allowed, but must be manufactured from materials complying with Class 0 or Class 1 rating. With assurance of code acceptance, a plastic duct system using rotomolded high density polyethylene ducts that had passed the material test requirements by impregnating the material with a fire retardant during the molding process was installed in the basement of a new ranch-style home in Madison, WI. A series of measurements to evaluate the performance benefits relative to a similar control house with a standard sheet metal installation were made.« less
NASA Technical Reports Server (NTRS)
Cook, M.
1989-01-01
The procedures, performance, and results obtained from the Thiokol Corporation/Wasatch Redesigned Field Joint Protection System (FJPS) Installation Evaluation are documented. The purpose of the evaluation was to demonstrate and develop the procedures required to install two different concepts (referred to as Concepts 1 and 3) of the redesigned FJPS. The processing capability of each configuration was then evaluated and compared. The FJPS is installed on redesigned solid rocket motors (RSRM) to protect the field joints from rain intrusion and to maintain the joint temperature sensor measurement between 85 and 122 F while the boosters are on the launch pad. The FJPS is being redesigned to reduce installation timelines at KSC and to simplify or eliminate installation processing problems related to the present design of an EPDM moisture seal/extruded cork combination. Several installation techniques were evaluated, and a preferred method of application was developed for each concept. The installations were performed with the test article in the vertical (flight) position. Comparative timelines between the two concepts were also developed. An additional evaluation of the Concept 3 configuration was performed with the test article in the horizontal position, to simulate an overhead installation on a technical evaluation motor (TEM).
2007-05-31
NASA's SOFIA airborne observatory lands at Edwards AFB after being flown from Waco, Texas to NASA Dryden for systems installation, integration and flight test. NASA's Stratospheric Observatory for Infrared Astronomy, or SOFIA, arrived at NASA's Dryden Flight Research Center at Edwards Air Force Base, Calif. on May 31, 2007. The heavily modified Boeing 747SP was ferried to Dryden from Waco, Texas, where L-3 Communications Integrated Systems installed a German-built 2.5-meter infrared telescope and made other major modifications over the past several years. SOFIA is scheduled to undergo installation and integration of mission systems and a multi-phase flight test program at Dryden over the next three years that is expected to lead to a full operational capability to conduct astronomy missions in about 2010. During its expected 20-year lifetime, SOFIA will be capable of "Great Observatory" class astronomical science, providing astronomers with access to the visible, infrared and sub-millimeter spectrum with optimized performance in the mid-infrared to sub-millimeter range.
DOE Office of Scientific and Technical Information (OSTI.GOV)
MCDANIEL, K.S.
1999-09-01
The test procedure provides for verifying indications and alarms The test procedure provides for verifying indications and alarms associated with the B Plant Canyon Ventilation System as they are being displayed on a remote monitoring workstation located in building 271-U. The system application software was installed by PLCS Plus under contract from B&W Hanford Company. The application software was installed on an existing operator workstation in building 271U which is owned and operated by Bechtel Hanford Inc.
Usability issues concerning child restraint system harness design.
Rudin-Brown, Christina M; Kumagai, Jason K; Angel, Harry A; Iwasa-Madge, Kim M; Noy, Y Ian
2003-05-01
A study was conducted to assess usability issues relating to child restraint system (CRS) harness design. Four convertible child restraint systems representing a wide variety of design features were used. Forty-two participants installed two child test dummies in both forward- and rear-facing configurations either inside or outside a test vehicle. Observer-scored checklists determined the degree to which each harness was installed correctly. Participant-scored questionnaires evaluated the 'ease-of-use' of various design features. While the percentage of correct installations exceeded 83% for all designs when installed in the forward-facing configuration, in the rear-facing position (that intended for children under 9-10 kg), there was a significant (between 65 and 89%) percentage of incorrect installations for all models. This finding is of particular interest and may be indicative of a more generalized problem with 'convertible' CRS designs when they are used in the rear-facing configuration. Furthermore, while certain design features were perceived by users as providing significantly better protection in the event of a collision, these also tended to be the features that were misused most often. The benefits and costs of various design features are discussed, and a method to test harness design usability is presented.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schoenbauer, B.; Bohac, D.; Huelman, P.
Combined space and water heater (combi or combo) systems are defined by their dual functionality. Combi systems provide both space heating and water heating capabilities with a single heat source. This guideline will focus on the installation and operation of residential systems with forced air heating and domestic hot water (DHW) functionality. Past NorthernSTAR research has used a combi system to replace a natural gas forced air distribution system furnace and tank type water heater (Schoenbauer et al. 2012; Schoenbauer, Bohac, and McAlpine 2014). The combi systems consisted of a water heater or boiler heating plant teamed with a hydronicmore » air handler that included an air handler, water coil, and water pump to circulate water between the heating plant and coil. The combi water heater or boiler had a separate circuit for DHW. Past projects focused on laboratory testing, field characterization, and control optimization of combi systems. Laboratory testing was done to fully characterize and test combi system components; field testing was completed to characterize the installed performance of combi systems; and control methodologies were analyzed to understand the potential of controls to simplify installation and design and to improve system efficiency and occupant comfort. This past work was relied upon on to create this measure guideline.« less
Regional Information System for Educators: Installation and Evaluation.
ERIC Educational Resources Information Center
Kromer, Charles
This document describes the installation and evaluation of the Regional Information System within the Michigan-Ohio Regional Educational Laboratory (MOREL). MOREL is an agency established to develop and test alternatives to current educational practice under Title IV of ESEA. The Regional Information System was established to provide referrals to…
Progreso en la puesta en marcha del espectrógrafo BHROS
NASA Astrophysics Data System (ADS)
Díaz, R.; Levato, H.; Casagrande, A.; Piroddi, D.; Yornet, G.; Eikenberry, S.; Gonzalez, F.; Townsend, A.; Godoy, J.; Marun, A.; Gunella, F.; D'Ambra, A.; Warner, C.; Bosch, G.; Donoso, V.; Grosso, M.; Seifer, E.
2017-10-01
We report the advance on the re-assembly and commissioning of the BHROS spectrograph, its associated instrument laboratory and the planned system of telescopes. This is the largest astronomical spectrograph ever assembled in Argentina and the laboratory is also being used for other instrumentation needs of ICATE. We have installed a half meter telescope in order to test the spectrograph with on-sky sources, and we plan to install a network of telescopes feeding it via a multiple optical fiber system. In these first tests we have obtained spectra of the Sun (R100000) and Jupiter and Achernar (R40000). In 2017-2018 we plan to install and test a network of five small telescopes feeding the spectrograph with the collecting area equivalent to that of a one meter telescope, with a cost 10-25 times less in acquisition, transport, installation and operation respect to a conventional monolithic telescope.
75 FR 54921 - Withdrawal of Regulatory Guides 1.38, 1.94, and 1.116
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-09
....116, ``Quality Assurance Requirements for Installation, Inspection, and Testing of Mechanical....116, ``Quality Assurance Requirements for Installation, Inspection, and Testing of Mechanical Equipment and Systems,'' dated May 1977. Regulatory Guide 1.38 endorses the American Society of Mechanical...
Evaluation of Installation Time for SMASHmount by SMASHsolar
DOE Office of Scientific and Technical Information (OSTI.GOV)
The Department of Energy SunShot Incubator program provides early-stage assistance to help startup companies cross technological barriers to commercialization while encouraging private sector investment. The SunShot Incubator program aims to shorten the time it takes for a young business or company to develop an innovative product concept and make it commercially available, which includes product prototyping, deployment, and, potentially, manufacturing. SMASHsolar was selected as an Incubator awardee to develop a simple, snap-together, module-integrated photovoltaic (PV) mounting system in attempts to dramatically reduce the time, effort and skill needed to install rooftop solar. In support of this award, the National Renewablemore » Energy Laboratory worked with SMASHsolar to develop a procedure for evaluating the installation time required for the SMASHmount system vs. widely-available rail systems. Amongst several installations, NREL measured the following installation times, subject to the qualifications and conditions described later in this report. NREL found that the SMASHsolar SMASHmount system was installed between 15% and 37% faster than tested competing systems after one or two installations of the system.« less
1989-02-28
AD-A259 245 RESEARCH TRIANGLE INSTITUTE I SOFTWARE SYSTEM USER’S MANUAL, REFERENCE MANUAL, AND INSTALLATION GUIDE FOR THE TEST ENGINEER’S ASSISTANT...SYSTEM U. yD"VxC - February 28, 1989 Iŕ 5 G3 ’Contract No. DAAL01-86-C-0039 W Prepared for: Department of the Army Electronics Research and...Development Command Fort Monmouth, New Jersey 07703 I Prepared by: Center for Digital Systems ResearchI Research Triangle Institute Research Triangle Park, NC
A Space Acquisition Leading Indicator Based on System Interoperation Maturity
2010-12-01
delivered hardware, improper use of soldering materials, improper installation of thermal blankets , and missing test procedure documentation A poor...office, the first GEO integrated payload and spacecraft successfully completed thermal vacuum (TVAC) testing in November 2009. Program officials...contamination in delivered hardware, improper use of soldering materials, improper installation of thermal blankets , and missing test procedure
NASA Astrophysics Data System (ADS)
Bezruchko, Konstantin; Davidov, Albert
2009-01-01
In the given article scientific and technical complex for modeling, researching and testing of rocket-space vehicles' power installations which was created in Power Source Laboratory of National Aerospace University "KhAI" is described. This scientific and technical complex gives the opportunity to replace the full-sized tests on model tests and to reduce financial and temporary inputs at modeling, researching and testing of rocket-space vehicles' power installations. Using the given complex it is possible to solve the problems of designing and researching of rocket-space vehicles' power installations efficiently, and also to provide experimental researches of physical processes and tests of solar and chemical batteries of rocket-space complexes and space vehicles. Scientific and technical complex also allows providing accelerated tests, diagnostics, life-time control and restoring of chemical accumulators for rocket-space vehicles' power supply systems.
2008-01-24
NASA Dryden technicians work on a fit-check mockup in preparation for systems installation work on an Orion boilerplate crew capsule for launch abort testing. A mockup Orion crew module has been constructed by NASA Dryden Flight Research Center's Fabrication Branch. The mockup is being used to develop integration procedures for avionics and instrumentation in advance of the arrival of the first abort flight test article.
2008-01-24
NASA Dryden technicians take measurements inside a fit-check mockup for prior to systems installation on a boilerplate Orion launch abort test crew capsule. A mockup Orion crew module has been constructed by NASA Dryden Flight Research Center's Fabrication Branch. The mockup is being used to develop integration procedures for avionics and instrumentation in advance of the arrival of the first abort flight test article.
Solar heating and hot water system installed at Alderson Broaddus College, Philippi, West Virginia
NASA Technical Reports Server (NTRS)
1981-01-01
Data needed necessary to evaluate the design and operation of a solar energy heating and hot water system installed in a commercial application are presented. The information includes system descriptions, acceptance test data, schematics, as built drawing, problems encountered, all solutions and photographs of the system at various stages of completion.
Error-proofing test system of industrial components based on image processing
NASA Astrophysics Data System (ADS)
Huang, Ying; Huang, Tao
2018-05-01
Due to the improvement of modern industrial level and accuracy, conventional manual test fails to satisfy the test standards of enterprises, so digital image processing technique should be utilized to gather and analyze the information on the surface of industrial components, so as to achieve the purpose of test. To test the installation parts of automotive engine, this paper employs camera to capture the images of the components. After these images are preprocessed including denoising, the image processing algorithm relying on flood fill algorithm is used to test the installation of the components. The results prove that this system has very high test accuracy.
Flight-test evaluation of civil helicopter terminal approach operations using differential GPS
NASA Technical Reports Server (NTRS)
Edwards, F. G.; Hegarty, D. M.
1989-01-01
A civil code differential Global Positioning System (DGPS) has been developed and flight-tested by the NASA Ames Research Center. The system was used to evaluate the performance of the DGPS for support of helicopter terminal approach operations. The airborne component of the DGPS was installed in a NASA helicopter. The ground-reference component was installed in a mobile van and equipped with a real-time VHF telemetry data link to transmit correction information to the aircraft system. An extensive series of tests was conducted to evaluate the performance of the system for several different configurations of the airborne navigation filter. This paper will describe the systems, the results of the flight tests, and the results of the posttest analysis.
Choi, Se Woon; Kim, Ill Soo; Park, Jae Hwan; Kim, Yousok; Sohn, Hong Gyoo; Park, Hyo Seon
2013-01-01
The outrigger truss system is one of the most frequently used lateral load resisting structural systems. However, little research has been reported on the effect of installation of outrigger trusses on improvement of lateral stiffness of a high-rise building through full-scale measurements. In this paper, stiffness changes of a high-rise building due to installation of outrigger trusses have been evaluated by measuring lateral displacements using a global positioning system (GPS). To confirm the error range of the GPS measurement system used in the full-scale measurement tests, the GPS displacement monitoring system is investigated through a free vibration test of the experimental model. Then, for the evaluation of lateral stiffness of a high-rise building under construction, the GPS displacement monitoring system is applied to measurements of lateral displacements of a 66-story high-rise building before and after installation of outrigger truss. The stiffness improvement of the building before and after the installation is confirmed through the changes of the natural frequencies and the ratios of the base shear forces to the roof displacements. PMID:24233025
46 CFR 160.135-11 - Fabrication of prototype lifeboats for approval.
Code of Federal Regulations, 2013 CFR
2013-10-01
.... The Commandant may prescribe additional prototype tests and inspections necessary to maintain quality... inspecting— (i) Fiber Reinforced Plastic (FRP) Construction. (A) FRP components of each prototype lifeboat... system; (vii) Installation of the steering system; and (viii) Installation of the water spray fire...
46 CFR 160.135-11 - Fabrication of prototype lifeboats for approval.
Code of Federal Regulations, 2012 CFR
2012-10-01
.... The Commandant may prescribe additional prototype tests and inspections necessary to maintain quality... inspecting— (i) Fiber Reinforced Plastic (FRP) Construction. (A) FRP components of each prototype lifeboat... system; (vii) Installation of the steering system; and (viii) Installation of the water spray fire...
46 CFR 160.135-11 - Fabrication of prototype lifeboats for approval.
Code of Federal Regulations, 2014 CFR
2014-10-01
.... The Commandant may prescribe additional prototype tests and inspections necessary to maintain quality... inspecting— (i) Fiber Reinforced Plastic (FRP) Construction. (A) FRP components of each prototype lifeboat... system; (vii) Installation of the steering system; and (viii) Installation of the water spray fire...
Establishment, test and evaluation of a prototype volcano surveillance system
NASA Technical Reports Server (NTRS)
Ward, P. L.; Eaton, J. P.; Endo, E.; Harlow, D.; Marquez, D.; Allen, R.
1973-01-01
A volcano-surveillance system utilizing 23 multilevel earthquake counters and 6 biaxial borehole tiltmeters is being installed and tested on 15 volcanoes in 4 States and 4 foreign countries. The purpose of this system is to give early warning when apparently dormant volcanoes are becoming active. The data are relayed through the ERTS-Data Collection System to Menlo Park for analysis. Installation was completed in 1972 on the volcanoes St. Augustine and Iliamna in Alaska, Kilauea in Hawaii, Baker, Rainier and St. Helens in Washington, Lassen in California, and at a site near Reykjavik, Iceland. Installation continues and should be completed in April 1973 on the volcanoes Santiaguito, Fuego, Agua and Pacaya in Guatemala, Izalco in El Salvador and San Cristobal, Telica and Cerro Negro in Nicaragua.
Response of a 2-story test-bed structure for the seismic evaluation of nonstructural systems
NASA Astrophysics Data System (ADS)
Soroushian, Siavash; Maragakis, E. "Manos"; Zaghi, Arash E.; Rahmanishamsi, Esmaeel; Itani, Ahmad M.; Pekcan, Gokhan
2016-03-01
A full-scale, two-story, two-by-one bay, steel braced-frame was subjected to a number of unidirectional ground motions using three shake tables at the UNR-NEES site. The test-bed frame was designed to study the seismic performance of nonstructural systems including steel-framed gypsum partition walls, suspended ceilings and fire sprinkler systems. The frame can be configured to perform as an elastic or inelastic system to generate large floor accelerations or large inter story drift, respectively. In this study, the dynamic performance of the linear and nonlinear test-beds was comprehensively studied. The seismic performance of nonstructural systems installed in the linear and nonlinear test-beds were assessed during extreme excitations. In addition, the dynamic interactions of the test-bed and installed nonstructural systems are investigated.
UKIRT fast guide system improvements
NASA Astrophysics Data System (ADS)
Balius, Al; Rees, Nicholas P.
1997-09-01
The United Kingdom Infra-Red Telescope (UKIRT) has recently undergone the first major upgrade program since its construction. One part of the upgrade program was an adaptive tip-tilt secondary mirror closed with a CCD system collectively called the fast guide system. The installation of the new secondary and associated systems was carried out in the first half of 1996. Initial testing of the fast guide system has shown great improvement in guide accuracy. The initial installation included a fixed integration time CCD. In the first part of 1997 an integration time controller based on computed guide star luminosity was implemented in the fast guide system. Also, a Kalman type estimator was installed in the image tracking loop based on a dynamic model and knowledge of the statistical properties of the guide star position error measurement as a function of computed guide star magnitude and CCD integration time. The new configuration was tested in terms of improved guide performance nd graceful degradation when tracking faint guide stars. This paper describes the modified fast guide system configuration and reports the results of performance tests.
47 CFR 76.601 - Performance tests.
Code of Federal Regulations, 2010 CFR
2010-10-01
... television system shall be responsible for insuring that each such system is designed, installed, and... cable television system shall conduct complete performance tests of that system at least twice each... tests shall be directed at determining the extent to which the system complies with all the technical...
ICPSU Install at Mobile Launcher
2018-03-14
A sliver of the Moon is visible just before sunrise at NASA's Kennedy Space Center in Florida. In view is one of the steel structures of the mobile launcher (ML). Several launch umbilicals have been installed on the ML tower. Exploration Ground Systems is overseeing installation of umbilicals and launch accessories on the ML to prepare for the first integrated test flight of the Orion spacecraft on the agency's Space Launch System rocket on Exploration Mission-1.
Flight Test Results for the HST Orbital Systems Test (HOST) Capillary Pump Loop Cooling System
NASA Technical Reports Server (NTRS)
Buchko, M.; Kaylor, M.; Kroliczek, E.; Ottenstein, L.
1999-01-01
The Near Infrared Camera and Multi Object Spectrometer (NICMOS) was installed in the Hubble Space Telescope (MST) in February 1997. Shortly thereafter, the instrument experienced a thermal short in its solid nitrogen dewar system which will significantly shorten the instrument's useful life. A reverse Brayton cycle mechanical refrigerator will be installed during the Third Servicing Mission (SM3) to provide cooling for the instrument, and thereby extend its operations. A Capillary Pump Loop (CPL) and radiator system was designed, built and tested to remove up to 500 watts of heat from the mechanical cryocooler and its associated electronics. The HST Orbital Systems Test (HOST) platform was flown on the Space Shuttle Discovery (STS-95) as a flight demonstration of the cryocooler system, CPL control electronics, and the CPL/Radiator. This paper will present the flight test results and thermal performance of the CPL system in detail.
Development and Testing of a Post-Installable Deepwater Monitoring System Using Fiber-Optic Sensors
NASA Technical Reports Server (NTRS)
Seaman, Calvin H.; Brower, David V.; Le, Suy Q.; Tang, Henry H.
2015-01-01
This paper addresses the design and development of a fiber-optic monitoring system that can be deployed on existing deepwater risers and flowlines; and provides a summary of test article fabrication and the subsequent laboratory testing performed at the National Aeronautics and Space Administration-Johnson Space Center (NASA-JSC). A major challenge of a post-installed instrumentation system is to ensure adequate coupling between the instruments and the riser or flowline of interest. This work investigates the sensor coupling for pipelines that are suspended in a water column (from topside platform to seabed) using a fiber-optic sensor clamp and subsea bonding adhesive. The study involved the design, fabrication, and test of several prototype clamps that contained fiber-optic sensors. A mold was produced by NASA using 3-D printing methods that allowed the casting of polyurethane clamp test articles to accommodate 4-inch and 8-inch diameter pipes. The prototype clamps were installed with a subsea adhesive in a "wet" environment and then tested in the NASA Structures Test Laboratory (STL). The tension, compression, and bending test data showed that the prototype sensor clamps achieved good structural coupling, and could provide high quality strain measurement for active monitoring.
NASA Technical Reports Server (NTRS)
Littell, Justin D.; Stimson, Chad M.
2016-01-01
Full-scale crash tests were conducted on three Cessna 172 aircraft at NASA Langley Research Center's Landing and Impact Research facility during the summer of 2015. The purpose of the three tests was to evaluate the performance of commercially available Emergency Locator Transmitter (ELT) systems and support development of enhanced installation guidance. ELTs are used to provide location information to Search and Rescue (SAR) organizations in the event of an aviation distress situation, such as a crash. The crash tests simulated three differing severe but survivable crash conditions, in which it is expected that the onboard occupants have a reasonable chance of surviving the accident and would require assistance from SAR personnel. The first simulated an emergency landing onto a rigid surface, while the second and third simulated controlled flight into terrain. Multiple ELT systems were installed on each airplane according to federal regulations. The majority of the ELT systems performed nominally. In the systems which did not activate, post-test disassembly and inspection offered guidance for non-activation cause in some cases, while in others, no specific cause could be found. In a subset of installations purposely disregarding best practice guidelines, failure of the ELT-to-antenna cabling connections were found. Recommendations for enhanced installation guidance of ELT systems will be made to the Radio Technical Commission for Aeronautics (RTCA) Special Committee 229 for consideration for adoption in a future release of ELT minimum operational performance specifications. These recommendations will be based on the data gathered during this test series as well as a larger series of crash simulations using computer models that will be calibrated based on these data
ERIC Educational Resources Information Center
Meyer, Calvin F.; Benson, Robert T.
This guide provides job relevant tasks, performance objectives, performance guides, resources, learning activitites, evaluation standards, and achievement testing in the occupation of environmental control system installer/servicer (residential air conditioning mechanic). It is designed to be used with any chosen teaching method. The course…
49 CFR 236.577 - Test, acknowledgement, and cut-in circuits.
Code of Federal Regulations, 2011 CFR
2011-10-01
... INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Inspection and Tests; Roadway § 236.577 Test...
NASA Technical Reports Server (NTRS)
2010-01-01
Employees at NASA's John C. Stennis Space Center work to maneuver a structural steam beam into place on the A-1 Test Stand on Jan. 13. The beam was one of several needed to form the thrust takeout structure that will support a new thrust measurement system being installed on the stand for future rocket engine testing. Once lifted onto the stand, the beams had to be hoisted into place through the center of the test stand, with only two inches of clearance on each side. The new thrust measurement system represents a state-of-the-art upgrade from the equipment installed more than 40 years ago when the test stand was first constructed.
Performance and Health Test Procedure for Grid Energy Storage Systems
DOE Office of Scientific and Technical Information (OSTI.GOV)
Baggu, Murali M; Smith, Kandler A; Friedl, Andrew
A test procedure to evaluate the performance and health of field installations of grid-connected battery energy storage systems (BESS) is described. Performance and health metrics captured in the procedures are: round-trip efficiency, standby losses, response time/accuracy, and useable energy/state of charge at different discharge/charge rates over the system's lifetime. The procedures are divided into reference performance tests, which require the system to be put in a test mode and are to be conducted in intervals, and real-time monitoring tests, which collect data during normal operation without interruption. The procedures can be applied on a wide array of BESS with littlemore » modification and can thus support BESS operators in the management of BESS field installations with minimal interruption and expenditure. Simulated results based on a detailed system simulation of a prototype system are provided as guideline.« less
Update on the Puerto Rico Electric Power Authority`s spinning reserve battery system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Taylor, P.A.
1996-11-01
The Puerto Rico Electric Power Authority completed start-up testing and began commercial operation of a 20MW/14MWh battery energy storage facility in April 1995. The battery system was installed to provide rapid spinning reserve and frequency control for the utility`s island electrical system. This paper outlines the needs of an island utility for rapid spinning reserve; identifies Puerto Rico`s unique challenges; reviews the technical and economic analyses that justified installation of a battery energy system; describes the storage facility that was installed; and presents preliminary operating results of the facility.
0.4 Percent Scale Space Launch System Wind Tunnel Test
2011-11-15
0.4 Percent Scale Space Launch System Wind Tunnel Test 0.4 Percent Scale SLS model installed in the NASA Langley Research Center Unitary Plan Wind Tunnel Test Section 1 for aerodynamic force and movement testing.
Static Frequency Converter System Installed and Tested
NASA Technical Reports Server (NTRS)
Brown, Donald P.; Sadhukhan, Debashis
2003-01-01
A new Static Frequency Converter (SFC) system has been installed and tested at the NASA Glenn Research Center s Central Air Equipment Building to provide consistent, reduced motor start times and improved reliability for the building s 14 large exhausters and compressors. The operational start times have been consistent around 2 min, 20 s per machine. This is at least a 3-min improvement (per machine) over the old variable-frequency motor generator sets. The SFC was designed and built by Asea Brown Boveri (ABB) and installed by Encompass Design Group (EDG) as part of a Construction of Facilities project managed by Glenn (Robert Scheidegger, project manager). The authors designed the Central Process Distributed Control Systems interface and control between the programmable logic controller, solid-state exciter, and switchgear, which was constructed by Gilcrest Electric.
Development of a Post-Installed Deepwater Monitoring System
NASA Technical Reports Server (NTRS)
Seaman, C.; Brower, D. V.; Tang, H.; Le, S.
2015-01-01
A monitoring system that can be deployed on already existing deep water risers and flowlines has been developed. This paper describes the design concepts and testing that was performed in developing the monitoring system. A major challenge of a post-installed instrumentation system is to ensure adequate coupling is achieved between the instruments and the riser or flowline. This work investigates the sensor coupling for pipelines that are suspended in both the water column (from topside platform to the seabed) and for those that are located directly on the seabed. These different environments have resulted in two sensor attachment methods: (1) subsea adhesive sensor clamp design and (2) a friction surface sensor attachment method. This paper presents the adhesive attachment method. The monitoring elements consist of fiber optic sensors that are encased in a polyurethane clamp. With a subsea adhesive, the clamp can be installed by divers in shallow depths or by use of an ROV for deeper applications. The NASA Johnson Space Center was initially involved in the selection and testing of subsea adhesives. It was determined that up to 75 percent of the bonding strength could be achieved with the adhesive from optimal dry bonding versus bonding in submerged sea water environments. The next phase of the study involved the design, fabrication, and testing of several prototype clamps that contained the fiber optic sensors. A mold was produced by NASA using 3-D printing methods that allowed the fabrication of subscale test articles that would accommodate 4-inch and 8-inch diameter pipes. The clamps were installed with adhesive in a "wet" environment on the pipe test articles and tested in the NASA Structures Test Laboratory. The tension/compression and bending tests showed that the prototype sensor clamps achieved good coupling, and could provide high quality strain measurement for active monitoring.
Dew Point Evaporative Comfort Cooling
2012-11-01
assisting with the installation of the data acquisition system and multiyear performance testing. Fort Carson engineers worked with the project...partners to design and integrate the Coolerado units into five facilities and designed an innovative rain water catchment system for four units at the...Theater. Mountain Energy Partnership provided invaluable assistance with the design and installation of the data acquisition system , as well as data
Continuous-flow stirred-tank reactor 20-L demonstration test: Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lee, D.D.; Collins, J.L.
One of the proposed methods of removing the cesium, strontium, and transuranics from the radioactive waste storage tanks at Savannah River is the small-tank tetraphenylborate (TPB) precipitation process. A two-reactor-in-series (15-L working volume each) continuous-flow stirred-tank reactor (CSTR) system was designed, constructed, and installed in a hot cell to test the Savannah River process. The system also includes two cross-flow filtration systems to concentrate and wash the slurry produced in the process, which contains the bulk of radioactivity from the supernatant processed through the system. Installation, operational readiness reviews, and system preparation and testing were completed. The first test usingmore » the filtration systems, two CSTRs, and the slurry concentration system was conducted over a 61-h period with design removal of Cs, Sr, and U achieved. With the successful completion of Test 1a, the following tests, 1b and 1c, were not required.« less
30 CFR 250.449 - What additional BOP testing requirements must I meet?
Code of Federal Regulations, 2010 CFR
2010-07-01
...? You must meet the following additional BOP testing requirements: (a) Use water to test a surface BOP system; (b) Stump test a subsea BOP system before installation. You must use water to conduct this test. You may use drilling fluids to conduct subsequent tests of a subsea BOP system; (c) Alternate tests...
Comprehensive Field Test and Evaluation of an Electronic Signpost AVM System. Volume I. Test Results
DOT National Transportation Integrated Search
1977-08-01
The report covers the activities of Phase I which involved the installation and test of a HI3 AVM System in Philadelphia, Pennsylvania, during the winter of 1976-1977. A summary report on all systems tested is Experiments on four different techniques...
Aeroacoustic Validation of Installed Low Noise Propulsion for NASA's N+2 Supersonic Airliner
NASA Technical Reports Server (NTRS)
Bridges, James
2018-01-01
An aeroacoustic test was conducted at NASA Glenn Research Center on an integrated propulsion system designed to meet noise regulations of ICAO Chapter 4 with 10EPNdB cumulative margin. The test had two objectives: to demonstrate that the aircraft design did meet the noise goal, and to validate the acoustic design tools used in the design. Variations in the propulsion system design and its installation were tested and the results compared against predictions. Far-field arrays of microphones measured the acoustic spectral directivity, which was transformed to full scale as noise certification levels. Phased array measurements confirmed that the shielding of the installation model adequately simulated the full aircraft and provided data for validating RANS-based noise prediction tools. Particle image velocimetry confirmed that the flow field around the nozzle on the jet rig mimicked that of the full aircraft and produced flow data to validate the RANS solutions used in the noise predictions. The far-field acoustic measurements confirmed the empirical predictions for the noise. Results provided here detail the steps taken to ensure accuracy of the measurements and give insights into the physics of exhaust noise from installed propulsion systems in future supersonic vehicles.
New concept for a general purpose subsea installation system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Citi, G.; Cowen, S.; Radicioni, A.
1996-12-31
The first use of the Agip SAF System (Sistema Alti Fondali), an installation and maintenance system for subsea production systems up to 1,000 m water depth, was successfully performed on the Luna 40 well in 180 m w.d. The system successfully installed the christmas tree, flowline jumpers, control system and high pressure cap as well as deploying the LMRP to allow the commissioning of the well. The SAF system performed all the planned tasks during the installation of the Luna 40 subsea tree and now has to be considered an operational success. The system is based around a Master Vehiclemore » that provides hydraulic power to, and controls a set of dedicated work modules. During the 2 test and 5 working dives, the Master Vehicle and the modules were subsea for a considerable period of time, up to 75 hours continuously, without any operational failures. This installation uncovered some system deficiencies that will have to be studied to improve the reliability and operability of the system. From the experience gained during this operation it has been shown that the system of a Master Vehicle providing locally generated hydraulic power is a feasible approach to many subsea installation problems. This paper describes the SAF system including improvements to be performed before being used operationally in up to 1,000 m of water and over. It also covers the necessary modifications required to allow the system to be deployed from a wide range of installation vessel.« less
Laboratory results of the AOF system testing
NASA Astrophysics Data System (ADS)
Kolb, Johann; Madec, Pierre-Yves; Arsenault, Robin; Oberti, Sylvain; Paufique, Jérôme; La Penna, Paolo; Ströbele, Stefan; Donaldson, Robert; Soenke, Christian; Suárez Valles, Marcos; Kiekebusch, Mario; Argomedo, Javier; Le Louarn, Miska; Vernet, Elise; Haguenauer, Pierre; Duhoux, Philippe; Aller-Carpentier, Emmanuel; Valenzuela, Jose Javier; Guerra, Juan Carlos
2016-07-01
For two years starting in February 2014, the AO modules GRAAL for HAWK-I and GALACSI for MUSE of the Adaptive Optics Facility project have undergone System Testing at ESO's Headquarters. They offer four different modes: NGS SCAO, LGS GLAO in the IR, LGS GLAO and LTAO in the visible. A detailed characterization of those modes was made possible by the existence of ASSIST, a test bench emulating an adaptive VLT including the Deformable Secondary Mirror, a star simulator and turbulence generator and a VLT focal plane re-imager. This phase aimed at validating all the possible components and loops of the AO modules before installation at the actual VLT that comprises the added complexity of real LGSs, a harsher non-reproducible environment and the adaptive telescope control. In this paper we present some of the major results obtained and challenges encountered during the phase of System Tests, like the preparation of the Acquisition sequence, the testing of the Jitter loop, the performance optimization in GLAO and the offload of low-order modes from the DSM to the telescope (restricted to the M2 hexapod). The System Tests concluded with the successful acceptance, shipping, installation and first commissioning of GRAAL in 2015 as well as the acceptance and shipping of GALACSI, ready for installation and commissioning early 2017.
NASA Tests 2nd RS-25 Flight Engine for Space Launch System
2018-01-16
On Jan. 16, 2018, engineers at NASA’s Stennis Space Center in Mississippi conducted a certification test of another RS-25 engine flight controller on the A-1 Test Stand at Stennis Space Center. The 365-second, full-duration test came a month after the space agency capped a year of RS-25 testing with a flight controller test in mid-December. For the “green run” test the flight controller was installed on RS-25 developmental engine E0528 and fired just as during an actual launch. Once certified, the flight controller will be removed and installed on a flight engine for use by NASA’s new deep-space rocket, the Space Launch System (SLS).
The development of large-aperture test system of infrared camera and visible CCD camera
NASA Astrophysics Data System (ADS)
Li, Yingwen; Geng, Anbing; Wang, Bo; Wang, Haitao; Wu, Yanying
2015-10-01
Infrared camera and CCD camera dual-band imaging system is used in many equipment and application widely. If it is tested using the traditional infrared camera test system and visible CCD test system, 2 times of installation and alignment are needed in the test procedure. The large-aperture test system of infrared camera and visible CCD camera uses the common large-aperture reflection collimator, target wheel, frame-grabber, computer which reduces the cost and the time of installation and alignment. Multiple-frame averaging algorithm is used to reduce the influence of random noise. Athermal optical design is adopted to reduce the change of focal length location change of collimator when the environmental temperature is changing, and the image quality of the collimator of large field of view and test accuracy are also improved. Its performance is the same as that of the exotic congener and is much cheaper. It will have a good market.
Installation of TVC Actuators in a Two Axis Inertial Load Simulator Test Stand
NASA Technical Reports Server (NTRS)
Dziubanek, Adam
2013-01-01
This paper is about the installation of Space Shuttle Main Engines (SSME) actuators in the new Two Axis Inertial Load Simulator (ILS) at MSFC. The new test stand will support the core stage of the Space Launch System (SLS). Because of the unique geometry of the new test stand standard actuator installation procedures will not work. I have been asked to develop a design on how to install the actuators into the new test stand. After speaking with the engineers and technicians I have created a possible design solution. Using Pro Engineer design software and running my own stress calculations I have proven my design is feasible. I have learned how to calculate the stresses my design will see from this task. From the calculations I have learned I have over built the apparatus. I have also expanded my knowledge of Pro Engineer and was able to create a model of my idea.
Solar Heater in a West Virginia College
NASA Technical Reports Server (NTRS)
1982-01-01
Solar space-heating and hot water system installed at Alderson-Broaddus College, Philippi, West Virginia, is described in 87-page document. Report contains description of building and its solar-energy system; specifications for solar-energy system, including collectors, coolant, storage tanks, circulation equipment, piping, controls, and insulation; acceptance test data; and discussion of problems with installation, their solution, and recommendations for dealing with excess solar energy.
Equipment and Tracking Test Results for the NRL Ship-to- Ship DF Laser Transmission Experiment.
1982-04-05
combined with the 2" collimated HeNe laser beam at dichoric beam splitter TBSI. TF2, TF1 , and TPFI direct the beam onto the f/6 parabola Pl. From...following work was done on the pumping system: 1. Install new valves , springs, and seats. 2. Install a new drive shaft, with new bearings and seals. 3...Install a new needle valve in the oil regulator. 4. Steam clean the inside pump surface. The new components were tested first with F2 fuel, then with NF 3
NASA Technical Reports Server (NTRS)
Hill, Gerald M.; Evans, Richard K.
2009-01-01
A large-scale, distributed, high-speed data acquisition system (HSDAS) is currently being installed at the Space Power Facility (SPF) at NASA Glenn Research Center s Plum Brook Station in Sandusky, OH. This installation is being done as part of a facility construction project to add Vibro-acoustic Test Capabilities (VTC) to the current thermal-vacuum testing capability of SPF in support of the Orion Project s requirement for Space Environments Testing (SET). The HSDAS architecture is a modular design, which utilizes fully-remotely managed components, enables the system to support multiple test locations with a wide-range of measurement types and a very large system channel count. The architecture of the system is presented along with details on system scalability and measurement verification. In addition, the ability of the system to automate many of its processes such as measurement verification and measurement system analysis is also discussed.
Effects of Nacelle configuration/position on performance of subsonic transport
NASA Technical Reports Server (NTRS)
Bangert, L. H.; Krivec, D. K.; Segall, R. N.
1983-01-01
An experimental study was conducted to explore possible reductions in installed propulsion system drag due to underwing aft nacelle locations. Both circular (C) and D inlet cross section nacelles were tested. The primary objectives were: to determine the relative installed drag of the C and D nacelle installations; and, to compare the drag of each aft nacelle installation with that of a conventional underwing forward, drag of each aft nacelle installation with that of a conventional underwing forward, pylon mounted (UTW) nacelle installation. The tests were performed in the NASA-Langley Research Center 16-Foot Transonic Wind Tunnel at Mach numbers from 0.70 to 0.85, airplane angles of attack from -2.5 to 4.1 degrees, and Reynolds numbers per foot from 3.4 to 4.0 million. The nacelles were installed on the NASA USB full span transonic transport model with horizontal tail on. The D nacelle installation had the smallest drag of those tested. The UTW nacelle installation had the largest drag, at 6.8 percent larger than the D at Mach number 0.80 and lift coefficient (C sub L) 0.45. Each tested configuration still had some interference drag, however. The effect of the aft nacelles on airplane lift was to increase C sub L at a fixed angle of attack relative to the wing body. There was higher lift on the inboard wing sections because of higher pressures on the wing lower surface. The effects of the UTW installation on lift were opposite to those of the aft nacelles.
Performance evaluation of molten salt thermal storage systems
NASA Astrophysics Data System (ADS)
Kolb, G. J.; Nikolai, U.
1987-09-01
The molton salt thermal storage system located at the Central Receiver Test Facility (CRTF) was recently subjected to thermal performance tests. The system is composed of a hot storage tank containing molten nitrate salt at a temperature of 1050 F and a cold tank containing 550 F salt with associated valves and controls. It is rated at 7 MWht and was designed and installed by Martin Marietta Corporation in 1982. The results of these tests were used to accomplish four objectives: (1) to compare the current thermal performance of the system with the performance of the system soon after it was installed, (2) to validate a dynamic computer model of the system, (3) to obtain an estimate of an annual system efficiency for a hypothetical commercial scale 1200 MWht system and (4) to compare the performance of the CRTF system with thermal storage systems developed by the European solar community.
Solar heater/cooler for mass market
NASA Technical Reports Server (NTRS)
1981-01-01
Report describes project to design, build, and test simple and affordable solar systems. Four combinations of heating, cooling, and domestic hot water supply systems were developed and installed. Test sites, plan for systems and components, and performance are discussed; text is complimented by detailed drawings and test data.
241-AZ-101 Waste Tank Color Video Camera System Shop Acceptance Test Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
WERRY, S.M.
2000-03-23
This report includes shop acceptance test results. The test was performed prior to installation at tank AZ-101. Both the camera system and camera purge system were originally sought and procured as a part of initial waste retrieval project W-151.
Automated System Tests High-Power MOSFET's
NASA Technical Reports Server (NTRS)
Huston, Steven W.; Wendt, Isabel O.
1994-01-01
Computer-controlled system tests metal-oxide/semiconductor field-effect transistors (MOSFET's) at high voltages and currents. Measures seven parameters characterizing performance of MOSFET, with view toward obtaining early indication MOSFET defective. Use of test system prior to installation of power MOSFET in high-power circuit saves time and money.
Insulation systems for liquid methane fuel tanks for supersonic cruise aircraft
NASA Technical Reports Server (NTRS)
Brady, H. F.; Delduca, D.
1972-01-01
Two insulation systems for tanks containing liquid methane in supersonic cruise-type aircraft were designed and tested after an extensive materials investigation. One system is an external insulation and the other is an internal wet-type insulation system. Tank volume was maximized by making the tank shape approach a rectangular parallelopiped. One tank was designed to use the external insulation and the other tank to use the internal insulation. Performance of the external insulation system was evaluated on a full-scale tank under the temperature environment of -320 F to 700 F and ambient pressures of ground-level atmospheric to 1 psia. Problems with installing the internal insulation on the test tank prevented full-scale evaluation of performance; however, small-scale testing verified thermal conductivity, temperature capability, and installed density.
A new electronic scanner of pressure designed for installation in wind-tunnel models
NASA Technical Reports Server (NTRS)
Coe, C. T.; Parra, G. T.; Kauffman, R. C.
1981-01-01
A new electronic scanner of pressure (ESOP) has been developed by NASA Ames Research Center for installation in wind-tunnel models. An ESOP system includes up to 20 pressure modules, each with 48 pressure transducers, an A/D converter, a microprocessor, a data controller, a monitor unit, and a heater controller. The system is sized so that the pressure modules and A/D converter module can be installed within an average-size model tested in the Ames Aerodynamics Division wind tunnels. This paper describes the ESOP system, emphasizing the main element of the system - the pressure module. The measured performance of the overall system is also presented.
Testing of lift/cruise fan exhaust deflector. [for a tip turbine lift fan in short takeoff aircraft
NASA Technical Reports Server (NTRS)
Schlundt, D. W.
1975-01-01
A lift/cruise exhaust deflector system for the LF336/A tip turbine lift fan was designed, built, and tested to determine the design and performance characteristics of a large-scale, single swivel nozzle thrust vectoring system. The exhaust deflector static testing was performed at the Ames Research Center outside static test stand facilities. The test hardware was installed on a hydraulic lift platform to permit both in and out of ground effect testing. The exhaust flow of the LF336/A lift fan was vectored from 0 degrees through 130 degrees during selected fan speeds to obtain performance at different operating conditions. The system was operated with and without flow vanes installed in the small radius bends to evaluate the system performance based on a proposed method of improving the internal flow losses. The program also included testing at different ground heights, to the nozzle exhaust plane, to obtain ground effect data, and the testing of two methods of thrust spoiling using a duct bypass door system and nozzle flap system.
Installation of C-6533(XE-2)/ARC ICS in UH-1H helicopter
NASA Astrophysics Data System (ADS)
Hnat, J. A.
1980-07-01
This report documents the results of the installation of the C-6533(XE-2)/ARC ICS in UH-1H helicopter. Installation was performed at the AEL, Inc., Monmouth County Airport facility. Design of each installation was coordinated and approved by the Government. The mechanical and electrical installation drawings for the helicopter are attached as Appendix A of this report. The new ICS system consisted of new cabling, new intercoms and helmets rewired with new microphones. All four crew stations of the helicopter were reconfigured with the new system. Existing cabling for the standard ICS system remained in the aircraft but was securely stowed for later restoration of the aircraft. The helmets (4) were rewired using separate jacks for headphones and microphone lines. Transmit and receive cables were installed in the aircraft with a minimum separation of one inch between cables. A junction box was fabricated and installed on the aft end of the console to house the fan-out terminal strips. Transmit and receive lines' separation was maintained in the junction box. During the test phase the onboard radios were used with the new ICS system.
Solar heating system installed at Stamford, Connecticut
NASA Technical Reports Server (NTRS)
1979-01-01
The solar heating system installed at the Lutz-Sotire Partnership Executive East Office Building, Stamford, Connecticut is described. The Executive East Office Building is of moderate size with 25,000 sq ft of heated space in 2 1/2 stories. The solar system was designed to provide approximately 50 percent of the heating requirements. The system components are described. Appended data includes: the system design acceptance test, the operation and maintenance manual, and as-built drawings and photographs.
Statement of Work Electrical Energy Storage System Installation at Sandia National Laboratories.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schenkman, Benjamin L.
2017-03-01
Sandia is seeking to procure a 1 MWh energy storage system. It will be installed at the existing Energy Storage Test Pad, which is located at Sandia National Laboratories in Albuquerque, New Mexico. This energy storage system will be a daily operational system, but will also be used as a tool in our Research and development work. The system will be part of a showcase of Sandia distributed energy technologies viewed by many distinguished delegates.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bachman, Gary
The Cleary University Geothermal Energy Retrofit project involved: 1. A thermal conductivity test; 2. Assessment of alternative horizontal and vertical ground heat exchanger options; 3. System design; 4. Asphalt was stripped from adjacent parking areas and a vertical geothermal ground heat exchanger system installed; 5. the ground heat exchanger was connected to building; 6. a system including 18 heat pumps, control systems, a manifold and pumps, piping for fluid transfer and ductwork for conditioned air were installed throughout the building.
Status of FEP encapsulated solar cell modules used in terrestrial applications
NASA Technical Reports Server (NTRS)
Ratajczak, A. F.; Forestieri, A. F.
1974-01-01
The Lewis Research Center has been engaged in transferring the FEP encapsulated solar cell technology developed for the space program to terrestrial applications. FEP encapsulated solar cell modules and arrays were designed and built expressly for terrestrial applications. Solar cell power systems were installed at three different land sites, while individual modules are undergoing marine environment tests. Four additional power systems are being completed for installation during the summer of 1974. These tests have revealed some minor problems which have been corrected. The results confirm the inherent utility of FEP encapsulated terrestrial solar cell systems.
ARIEL E-linac Cryogenic System: Commissioning and First Operational Experience
NASA Astrophysics Data System (ADS)
Koveshnikov, A.; Bylinskii, I.; Hodgson, G.; Kishi, D.; Laxdal, R.; Ma, Y.; Nagimov, R.; Yosifov, D.
2015-12-01
The Advanced Rare IsotopE Laboratory (ARIEL) is a major expansion of the Isotope Separator and Accelerator (ISAC) facility at TRIUMF. A key part of the ARIEL project is a 10 mA 50 MeV continuous-wave superconducting radiofrequency (SRF) electron linear accelerator (e-linac). The 1.3 GHz SRF cavities are operated at 2 K. HELIAL LL helium liquefier by Air Liquide Advanced Technologies (ALAT) with a tuneable liquid helium (LHe) production was installed and commissioned in Q4’2013 [1]. It provides 4 K liquid helium to one injector and one accelerator cryomodules that were installed and tested in 2014. The 4 K to 2 K liquid helium transition is achieved on-board of each cryomodule. The cryoplant, LHe and LN2 distributions, sub-atmospheric (S/A) system and cryomodules were successfully commissioned and integrated into the e-linac cryogenic system. Required pressure regulation for both 4 K cryoplant in the Dewar and 2 K with the S/A system was achieved under simulated load. Final integration tests confirmed overall stable performance of the cryogenic system with two cryomodules installed. The paper presents details of the cryogenic system commissioning tests as well as highlights of the initial operational experience.
SIMS prototype system 3 test results: Engineering analysis
NASA Technical Reports Server (NTRS)
1978-01-01
The results obtained during testing of a closed hydronic drain down solar system designed for space and hot water heating is presented. Data analysis is included which documents the system performance and verifies the suitability of SIMS Prototype System 3 for field installation.
DOE Office of Scientific and Technical Information (OSTI.GOV)
PALMER, M.E.
1999-09-21
Test Plan HNF-4351 defines testing requirements for installation of a new server in the WRAP Facility. This document shows the results of the test reports on the DMS-Y2K and DMS-F81 (Security) systems.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Abramowitz, Howard; Brandys, Marek; Cecil, Richard
2012-12-11
Melter tests were conducted to determine the retention of technetium and other volatiles in glass while processing simulated Low Activity Waste (LAW) streams through a DM10 melter equipped with a prototypical off-gas system that concentrates and recycles fluid effiuents back to the melter feed. To support these tests, an existing DM10 system installed at Vitreous State Laboratory (VSL) was modified to add the required recycle loop. Based on the Hanford Tank Waste Treatment and Immobilization Plant (WTP) LAW off-gas system design, suitably scaled versions of the Submerged Bed Scrubber (SBS), Wet Electrostatic Precipitator (WESP), and TLP vacuum evaporator were designed,more » built, and installed into the DM10 system. Process modeling was used to support this design effort and to ensure that issues associated with the short half life of the {sup 99m}Tc radioisotope that was used in this work were properly addressed and that the system would be capable of meeting the test objectives. In particular, this required that the overall time constant for the system was sufficiently short that a reasonable approach to steady state could be achieved before the {sup 99m}Tc activity dropped below the analytical limits of detection. The conceptual design, detailed design, flow sheet development, process model development, Piping and Instrumentation Diagram (P&ID) development, control system design, software design and development, system fabrication, installation, procedure development, operator training, and Test Plan development for the new system were all conducted during this project. The new system was commissioned and subjected to a series of shake-down tests before embarking on the planned test program. Various system performance issues that arose during testing were addressed through a series of modifications in order to improve the performance and reliability of the system. The resulting system provided a robust and reliable platform to address the test objectives.« less
Test Results of Initial Installation DATAS/TCAS Monitor: DFW Airport
DOT National Transportation Integrated Search
1992-01-01
This document presents the results of initial tests with the Data Link Test and : Analysis System (DATAS)/Traffic Alert and Collision Avoidance System (TCAS). : Since a significant amount of air carriers have recently been equipped with : Traffic Ale...
Testing Installed Propulsion for Shielded Exhaust Configurations
NASA Technical Reports Server (NTRS)
Bridges, James E.; Podboy, Gary G.; Brown, Clifford A.
2016-01-01
Jet-surface interaction (JSI) can be a significant factor in the exhaust noise of installed propulsion systems. Tests to further the understanding and prediction of the acoustic impacts of JSI have been described. While there were many objectives for the test, the overall objective was to prepare for a future test validating the design of a low-noise, lowboom supersonic commercial airliner. In this paper we explore design requirements for a partial aircraft model to be used in subscale acoustic testing, especially focusing on the amount of aircraft body that must be included to produce the acoustic environment between propulsion exhaust system and observer. We document the dual-stream jets, both nozzle and flow conditions, which were tested to extend JSI acoustic modeling from simple singlestream jets to realistic dual-stream exhaust nozzles. Sample observations are provided of changes to far-field sound as surface geometry and flow conditions were varied. Initial measurements are presented for integrating the propulsion on the airframe for a supersonic airliner with simulated airframe geometries and nozzles. Acoustic impacts of installation were modest, resulting in variations of less than 3 EPNdB in most configurations.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Van Geet, Otto D.; Fu, Ran; Horowitz, Kelsey A.
NREL studied a new type of photovoltaic (PV) module configuration wherein multiple narrow, tilted slats are mounted in a single frame. Each slat of the PV slat module contains a single row of cells and is made using ordinary crystalline silicon PV module materials and processes, including a glass front sheet and weatherproof polymer encapsulation. Compared to a conventional ballasted system, a system using slat modules offer higher energy production and lower weight at lower LCOE. The key benefits of slat modules are reduced wind loading, improved capacity factor and reduced installation cost. First, the individual slats allow air tomore » flow through, which reduce wind loading. Using PV performance modeling software, we compared the performance of an optimized installation of slats modules to a typical installation of conventional modules in a ballasted rack mounting system. Based on the results of the performance modeling two different row tilt and spacing were tested in a wind tunnel. Scaled models of the PV Slat modules were wind tunnel tested to quantify the wind loading of a slat module system on a commercial rooftop, comparing the results to conventional ballasted rack mounted PV modules. Some commercial roofs do not have sufficient reserve dead load capacity to accommodate a ballasted system. A reduced ballast system design could make PV system installation on these roofs feasible for the first time without accepting the disadvantages of penetrating mounts. Finally, technoeconomic analysis was conducted to enable an economic comparison between a conventional commercial rooftop system and a reduced-ballast slat module installation.« less
Reliability, Maintainability, and Performance Issues in Hydraulic System Design
1977-06-01
the piston and control valve, typically between 0.85 and 0.95 for an integrally mounted valve In a practical hardware installation, the actuator ...around the null position due to internal leakage through the piston seal and in the control valve. A newly installed CH-47 swashplate control actuator ...except when the pump is installed in the manu- facturer’s own test
Fiber Optic System Test Results In A Tactical Military Aircraft
NASA Astrophysics Data System (ADS)
Uhlhorn, Roger W.; Greenwell, Roger A.
1980-09-01
The YAV-8B Electromagnetic Immunity and Flight-Test Program was established to evaluate the susceptibility of wire and optical fiber signal transmission lines to electromagnetic interference when these lines are installed in a graphite/epoxy composite wing and to demonstrate the flightworthiness of fiber optics interconnects in the vertical/ short takeoff and landing aircraft environment. In response, two fiber optic systems were designed, fabricated, and flight tested by McDonnell Aircraft Co. (MCAIR), a division of the McDonnell Douglas Corporation, on the two YAV-8B V/STOL flight test aircraft. The program successfully demonstrated that fiber optics are compatible with the attack aircraft environment. As a result, the full scale development AV-8B will incorporate fiber optics in a point-to-point data link. We describe here the fiber optic systems designs, test equipment development, cabling and connection requirements, fabrication and installation experience, and flight test program results.
Aerodynamic stability analysis of NASA J85-13/planar pressure pulse generator installation
NASA Technical Reports Server (NTRS)
Chung, K.; Hosny, W. M.; Steenken, W. G.
1980-01-01
A digital computer simulation model for the J85-13/Planar Pressure Pulse Generator (P3 G) test installation was developed by modifying an existing General Electric compression system model. This modification included the incorporation of a novel method for describing the unsteady blade lift force. This approach significantly enhanced the capability of the model to handle unsteady flows. In addition, the frequency response characteristics of the J85-13/P3G test installation were analyzed in support of selecting instrumentation locations to avoid standing wave nodes within the test apparatus and thus, low signal levels. The feasibility of employing explicit analytical expression for surge prediction was also studied.
Advanced wiring technique and hardware application: Airplane and space vehicle
NASA Technical Reports Server (NTRS)
Ernst, H. L.; Eichman, C. D.
1972-01-01
An advanced wiring system is described which achieves the safety/reliability required for present and future airplane and space vehicle applications. Also, present wiring installation techniques and hardware are analyzed to establish existing problem areas. An advanced wiring system employing matrix interconnecting unit, plug to plug trunk bundles (FCC or ribbon cable) is outlined, and an installation study presented. A planned program to develop, lab test and flight test key features of these techniques and hardware as a part of the SST technology follow-on activities is discussed.
NASA Astrophysics Data System (ADS)
Pezzi, M.; Favaro, M.; Gregori, D.; Ricci, P. P.; Sapunenko, V.
2014-06-01
In large computing centers, such as the INFN CNAF Tier1 [1], is essential to be able to configure all the machines, depending on use, in an automated way. For several years at the Tier1 has been used Quattor[2], a server provisioning tool, which is currently used in production. Nevertheless we have recently started a comparison study involving other tools able to provide specific server installation and configuration features and also offer a proper full customizable solution as an alternative to Quattor. Our choice at the moment fell on integration between two tools: Cobbler [3] for the installation phase and Puppet [4] for the server provisioning and management operation. The tool should provide the following properties in order to replicate and gradually improve the current system features: implement a system check for storage specific constraints such as kernel modules black list at boot time to avoid undesired SAN (Storage Area Network) access during disk partitioning; a simple and effective mechanism for kernel upgrade and downgrade; the ability of setting package provider using yum, rpm or apt; easy to use Virtual Machine installation support including bonding and specific Ethernet configuration; scalability for managing thousands of nodes and parallel installations. This paper describes the results of the comparison and the tests carried out to verify the requirements and the new system suitability in the INFN-T1 environment.
Automation and Upgrade of Thermal System for Large 38-Year-Young Test Facility
NASA Technical Reports Server (NTRS)
Webb, Andrew T.; Powers, Edward I. (Technical Monitor)
2000-01-01
The Goddard Space Flight Center's Space Environment Simulator (SES) facility has been improved by the upgrade of its thermal control hardware and software. This paper describes the preliminary design process, funding constraints, and the proposed enhancements as well as the installation details, the testing difficulties, and the overall benefits realized from this upgrade. The preliminary design process was discussed in a paper presented in October 1996 and will be recapped in this paper to provide background and comparison to actual product. Structuring the procurement process to match the funding constraints allowed Goddard to enhance its capabilities in an environment of reduced budgets. The installation of the new system into a location that has been occupied for over 38 years was one of the driving design factors for the size of the equipment. The installation was completed on time and under budget. The tuning of the automatic sequences for the new thermal system to the existing shroud system required more time and ultimately presented some setbacks to the vendor and the final completion of the system. However, the end product and its benefits to Goddard's thermal vacuum test portfolio will carry the usefulness of this facility well into the next century.
Automation and Upgrade of Thermal System for Large 38-Year Young Test Facility
NASA Technical Reports Server (NTRS)
Webb, Andrew
2000-01-01
The Goddard Space Flight Center's Space Environment Simulator (SES) facility has been improved by the upgrade of its thermal control hardware and software. This paper describes the preliminary design process, funding constraints, and the proposed enhancements as well as the installation details, the testing difficulties, and the overall benefits realized from this upgrade. The preliminary design process was discussed in a paper presented in October 1996 and will be recapped in this paper to provide background and comparison to actual product. Structuring the procurement process to match the funding constraints allowed Goddard to enhance its capabilities in an environment of reduced budgets. The installation of the new system into a location that has been occupied for over 38-years was one of the driving design factors for the size of the equipment. The installation was completed on-time and under budget. The tuning of the automatic sequences for the new thermal system to the existing shroud system required more time and ultimately presented some setbacks to the vendor and the final completion of the system. However, the end product and its benefits to Goddard's thermal vacuum test portfolio will carry the usefulness of this facility well into the next century.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zeigler, Kristine E.; Ferguson, Blythe A.
2012-07-01
The Savannah River National Laboratory (SRNL) has established an In Situ Decommissioning (ISD) Sensor Network Test Bed, a unique, small scale, configurable environment, for the assessment of prospective sensors on actual ISD system material, at minimal cost. The Department of Energy (DOE) is presently implementing permanent entombment of contaminated, large nuclear structures via ISD. The ISD end state consists of a grout-filled concrete civil structure within the concrete frame of the original building. Validation of ISD system performance models and verification of actual system conditions can be achieved through the development a system of sensors to monitor the materials andmore » condition of the structure. The ISD Sensor Network Test Bed has been designed and deployed to addresses the DOE-Environmental Management Technology Need to develop a remote monitoring system to determine and verify ISD system performance. Commercial off-the-shelf sensors have been installed on concrete blocks taken from walls of the P Reactor Building at the Savannah River Site. Deployment of this low-cost structural monitoring system provides hands-on experience with sensor networks. The initial sensor system consists of groutable thermistors for temperature and moisture monitoring, strain gauges for crack growth monitoring, tilt-meters for settlement monitoring, and a communication system for data collection. Baseline data and lessons learned from system design and installation and initial field testing will be utilized for future ISD sensor network development and deployment. The Sensor Network Test Bed at SRNL uses COTS sensors on concrete blocks from the outer wall of the P Reactor Building to measure conditions expected to occur in ISD structures. Knowledge and lessons learned gained from installation, testing, and monitoring of the equipment will be applied to sensor installation in a meso-scale test bed at FIU and in future ISD structures. The initial data collected from the sensors installed on the P Reactor Building blocks define the baseline materials condition of the P Reactor ISD external concrete structure. Continued monitoring of the blocks will enable evaluation of the effects of aging on the P Reactor ISD structure. The collected data will support validation of the material degradation model and assessment of the condition of the ISD structure over time. The following are recommendations for continued development of the ISD Sensor Network Test Bed: - Establish a long-term monitoring program using the concrete blocks with existing sensor and/or additional sensors for trending the concrete materials and structural condition; - Continue development of a stand-alone test bed sensor system that is self-powered and provides wireless transmission of data to a user-accessible dashboard; - Develop and implement periodic NDE/DE characterization of the concrete blocks to provide verification and validation for the measurements obtained through the sensor system and concrete degradation model(s). (authors)« less
Development of TPS flight test and operational instrumentation
NASA Technical Reports Server (NTRS)
Carnahan, K. R.; Hartman, G. J.; Neuner, G. J.
1975-01-01
Thermal and flow sensor instrumentation was developed for use as an integral part of the space shuttle orbiter reusable thermal protection system. The effort was performed in three tasks: a study to determine the optimum instruments and instrument installations for the space shuttle orbiter RSI and RCC TPS; tests and/or analysis to determine the instrument installations to minimize measurement errors; and analysis using data from the test program for comparison to analytical methods. A detailed review of existing state of the art instrumentation in industry was performed to determine the baseline for the departure of the research effort. From this information, detailed criteria for thermal protection system instrumentation were developed.
Specimen's plane misaligned installation solution based on charge fluctuation inside SEM
NASA Astrophysics Data System (ADS)
Lu, Haojian; Liu, Yanting; Yang, Yuanyuan; Wang, Panbing; Shen, Yajing
2018-04-01
Precise specimen's installation is a sticking point to ensure the characterization accuracy of the in-situ material property test. Although it is common knowledge that specimen's plane misaligned installation (PMI) would cause extra force loading during mechanical testing, there are few effective solutions available to deal with it at the current stage, especially during the in-situ scanning electron microscopy (SEM) test. Taking into consideration the charge fluctuation phenomenon under SEM, this paper proposes a highlight area variation (HAV) method for specimen deformation judgment, i.e., the specimen deformation is defined when the highlight area changes greater than 20% of the initial value of the specimen surface. Three types of specimens with different resistivities, i.e., human hair (electrical resistivity ˜3 × 1012 Ω cm), optical fiber (electrical resistivity ˜1017 Ω cm), and magnetic wire (electrical resistivity ˜2 × 10-5 Ω cm), are chosen to verify the effectiveness of the HAV method. Furthermore, combined with the developed robot-aided alignment system, the specimen's PMI problem can also be solved. In the demonstration, the human hair specimen is installed across two specimen stages and its in-situ twisting (in 360°) test is implemented. The results clearly indicate that the HAV method and the robot-aided alignment system are practical and reliable, and the specimen can be aligned on the same plane and installed precisely with accuracy up to 3 μm. This method will benefit the in-situ SEM material mechanical property test and has a significant impact in fundamental material research.
Nacelle Aerodynamic and Inertial Loads (NAIL) project
NASA Technical Reports Server (NTRS)
1982-01-01
A flight test survey of pressures measured on wing, pylon, and nacelle surfaces and of the operating loads on Boeing 747/Pratt & Whitney JT9D-7A nacelles was made to provide information on airflow patterns surrounding the propulsion system installations and to clarify processes responsible for inservice deterioration of fuel economy. Airloads at takeoff rotation were found to be larger than at any other normal service condition because of the combined effects of high angle of attack and high engine airflow. Inertial loads were smaller than previous estimates indicated. A procedure is given for estimating inlet airloads at low speeds and high angles of attack for any underwing high bypass ratio turbofan installation approximately resembling the one tested. Flight procedure modifications are suggested that may result in better fuel economy retention in service. Pressures were recorded on the core cowls and pylons of both engine installations and on adjacent wing surfaces for use in development of computer codes for analysis of installed propulsion system aerodynamic drag interference effects.
Development of the STPX Spheromak System
NASA Astrophysics Data System (ADS)
Williams, R. L.; Clark, J.; Weatherford, C. A.
2015-11-01
The progress made in starting up the STPX Spheromak system, which is now installed at the Florida A&M University, is reviewed. Experimental, computational and theoretical activities are underway. The control system for firing the magnetized coaxial plasma gun and for collecting data from the diagnostic probes, based on LabView, is being tested and adapted. Preliminary results of testing the installed magnetic field probes, Langmuir triple probes, cylindrical ion probes, and optical diagnostics will be discussed. Progress in modeling this spheromak using simulation codes, such as NIMROD, will be discussed. Progress in investigating the use of algebraic topology to describe this spheromak will be reported.
Testing the newly installed PCE (Proximity Communications Equipment) hardware
2005-06-29
ISS011-E-09816 (28 June 2005) --- Cosmonaut Sergei K. Krikalev, Expedition 11 commander representing Russia's Federal Space Agency, tests the newly installed Proximity Communications Equipment (PCE) hardware of the ASN-M satellite navigation system for the European Automated Transfer Vehicle (ATV) Jules Verne in the Zvezda Service Module of the International Space Station. The ATV is scheduled to arrive at the Station next year.
Testing the newly installed PCE (Proximity Communications Equipment) hardware
2005-06-28
ISS011-E-09812 (28 June 2005) --- Cosmonaut Sergei K. Krikalev, Expedition 11 commander representing Russia's Federal Space Agency, tests the newly installed Proximity Communications Equipment (PCE) hardware of the ASN-M satellite navigation system for the European Automated Transfer Vehicle (ATV) Jules Verne in the Zvezda Service Module of the international space station. The ATV is scheduled to arrive at the station next year.
2012-05-01
Hawaii (U.S. Army Environmental Command, 2008). The installation is located in the saddle between Mauna Loa and Mauna Kea volcanoes. PTA is located...17 5.2 SITE LOCATION, HISTORY , AND SITE CHARACTERISTICS...allowed the system to be tested and validated under different conditions and on different vehicle types. 5.2 SITE LOCATION, HISTORY , AND SITE
Geothermal switch heater installation, testing and monitoring : phases 1 & 2.
DOT National Transportation Integrated Search
2016-07-01
Transportation Technology Center, Inc. (TTCI), Norfolk Southern (NS), and John A. Volpe National Transportation Systems Center (Volpe) completed Phases 1 and 2 of a project on a working prototype geothermal switch heating system designed to test the ...
Automated water monitor system field demonstration test report. Volume 2: Technical summary
NASA Technical Reports Server (NTRS)
Brooks, R. L.; Jeffers, E. L.; Perreira, J.; Poel, J. D.; Nibley, D.; Nuss, R. H.
1981-01-01
The NASA Automatic Water Monitor System was installed in a water reclamation facility to evaluate the technical and cost feasibility of producing high quality reclaimed water. Data gathered during this field demonstration test are reported.
16 CFR 1211.13 - Inherent force activated secondary door sensors.
Code of Federal Regulations, 2011 CFR
2011-01-01
... sensors. 1211.13 Section 1211.13 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION CONSUMER PRODUCT... § 1211.13 Inherent force activated secondary door sensors. (a) Normal operation test. (1) A force activated door sensor of a door system installed according to the installation instructions shall actuate...
16 CFR 1211.13 - Inherent force activated secondary door sensors.
Code of Federal Regulations, 2014 CFR
2014-01-01
... sensors. 1211.13 Section 1211.13 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION CONSUMER PRODUCT... § 1211.13 Inherent force activated secondary door sensors. (a) Normal operation test. (1) A force activated door sensor of a door system installed according to the installation instructions shall actuate...
16 CFR 1211.13 - Inherent force activated secondary door sensors.
Code of Federal Regulations, 2012 CFR
2012-01-01
... sensors. 1211.13 Section 1211.13 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION CONSUMER PRODUCT... § 1211.13 Inherent force activated secondary door sensors. (a) Normal operation test. (1) A force activated door sensor of a door system installed according to the installation instructions shall actuate...
The Structural Heat Intercept-Insulation-Vibration Evaluation Rig (SHIVER)
NASA Technical Reports Server (NTRS)
Johnson, W. L.; Zoeckler, J. G.; Best-Ameen, L. M.
2015-01-01
NASA is currently investigating methods to reduce the boil-off rate on large cryogenic upper stages. Two such methods to reduce the total heat load on existing upper stages are vapor cooling of the cryogenic tank support structure and integration of thick multilayer insulation systems to the upper stage of a launch vehicle. Previous efforts have flown a 2-layer MLI blanket and shown an improved thermal performance, and other efforts have ground-tested blankets up to 70 layers thick on tanks with diameters between 2 3 meters. However, thick multilayer insulation installation and testing in both thermal and structural modes has not been completed on a large scale tank. Similarly, multiple vapor cooled shields are common place on science payload helium dewars; however, minimal effort has gone into intercepting heat on large structural surfaces associated with rocket stages. A majority of the vapor cooling effort focuses on metallic cylinders called skirts, which are the most common structural components for launch vehicles. In order to provide test data for comparison with analytical models, a representative test tank is currently being designed to include skirt structural systems with integral vapor cooling. The tank is 4 m in diameter and 6.8 m tall to contain 5000 kg of liquid hydrogen. A multilayer insulation system will be designed to insulate the tank and structure while being installed in a representative manner that can be extended to tanks up to 10 meters in diameter. In order to prove that the insulation system and vapor cooling attachment methods are structurally sound, acoustic testing will also be performed on the system. The test tank with insulation and vapor cooled shield installed will be tested thermally in the B2 test facility at NASAs Plumbrook Station both before and after being vibration tested at Plumbrooks Space Power Facility.
Portable Test And Monitoring System For Wind-Tunnel Models
NASA Technical Reports Server (NTRS)
Poupard, Charles A.
1987-01-01
Portable system developed to test and monitor instrumentation used in wind-tunnel models. Self-contained and moves easily to model, either before or after model installed in wind tunnel. System is 44 1/2 in. high, 22 in. wide, and 17 in. deep and weighs 100 lb. Primary benefits realized with portable test and monitoring system associated with saving of time.
DOE Office of Scientific and Technical Information (OSTI.GOV)
T. Schirber, B. Schoenbauer
High-performance water heaters are typically more time consuming and costly to install in retrofit applications, making high-performance water heaters difficult to justify economically. However, recent advancements in high-performance water heaters have targeted the retrofit market, simplifying installations and reducing costs. Four high-efficiency natural gas water heaters designed specifically for retrofit applications were installed in single-family homes along with detailed monitoring systems to characterize their savings potential, their installed efficiencies, and their ability to meet household demands.
Prototype space erectable radiator system ground test article development
NASA Technical Reports Server (NTRS)
Alario, Joseph P.
1988-01-01
A prototype heat rejecting system is being developed by NASA-JSC for possible space station applications. This modular system, the Space-Erectable Radiator System Ground Test Article (SERS-GTA) with high-capacity radiator panels, can be installed and replaced on-orbit. The design, fabrication and testing of a representative ground test article are discussed. Acceptance test data for the heat pipe radiator panel and the whiffletree clamping mechanism have been presented.
NASA Astrophysics Data System (ADS)
Viola, S.; Ardid, M.; Bertin, V.; Enzenhöfer, A.; Keller, P.; Lahmann, R.; Larosa, G.; Llorens, C. D.; NEMO Collaboration; SMO Collaboration
2013-10-01
Within the activities of the NEMO project, the installation of a 8-floors tower (NEMO-Phase II) at a depth of 3500 m is foreseen in 2012. The tower will be installed about 80 km off-shore Capo Passero, in Sicily. On board the NEMO tower, an array of 18 acoustic sensors will be installed, permitting acoustic detection of biological sources, studies for acoustic neutrino detection and primarily acoustic positioning of the underwater structures. For the latter purpose, the sensors register acoustic signals emitted by five acoustic beacons anchored on the sea-floor. The data acquisition system of the acoustic sensors is fully integrated with the detector data transport system and is based on an “all data to shore” philosophy. Signals coming from hydrophones are continuously sampled underwater at 192 kHz/24 bit and transmitted to shore through an electro-optical cable for real-time analysis. A novel technology for underwater GPS time-stamping of data has been implemented and tested. The operation of the acoustic array will permit long-term test of sensors and electronics technologies that are proposed for the acoustic positioning system of KM3NeT.
14 CFR 25.934 - Turbojet engine thrust reverser system tests.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Turbojet engine thrust reverser system... TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Powerplant General § 25.934 Turbojet engine thrust reverser system tests. Thrust reversers installed on turbojet engines must meet the...
Solar domestic water heating performance test program - Interim report
NASA Astrophysics Data System (ADS)
Auris, R. H.
Performance results from utility-installed or monitored flat plate collector systems on 13 residences are reported. The systems comprised either drain-down, i.e., emptying the water-working fluid into a reservoir in response to thermistor sensing of sufficiently low temperatures, or water/glycol mixture as freeze protection measures. Installation errors committeed by commercial solar contractors employed by the utility customers are outlined, indicating the uncertainty involved in obtaining a quality installation. Most system failures occurred with the drain-down systems, which also featured the highest system efficiencies. Redundancy in the control systems is suggested to offer significant improvements in system efficiency. The systems provided an average of 40% of the annual hot water needs, and the development of low cost materials, better system designs, low cost financing, and increased tax credits are concluded to be methods of making the systems cost effective.
TARA MARSHALL AND MIKE NICHOLS AT TEST STAND 4693
2016-12-14
TARA MARSHALL, LEFT, A MARSHALL ENGINEER, TALKS ABOUT THE INSTALLATION OF A PRESSURIZATION CONTROL PANEL AT TEST STAND 4693 WITH MIKE NICHOLS, LEAD TEST ENGINEER FOR THE SPACE LAUNCH SYSTEM LIQUID HYDROGEN TANK STRUCTURAL TEST ARTICLE.
NASA Astrophysics Data System (ADS)
Erkaya, Yunus
The number of solar photovoltaic (PV) installations is growing exponentially, and to improve the energy yield and the efficiency of PV systems, it is necessary to have correct methods for simulation, measurement, and emulation. PV systems can be simulated using PV models for different configurations and technologies of PV modules. Additionally, different environmental conditions of solar irradiance, temperature, and partial shading can be incorporated in the model to accurately simulate PV systems for any given condition. The electrical measurement of PV systems both prior to and after making electrical connections is important for attaining high efficiency and reliability. Measuring PV modules using a current-voltage (I-V) curve tracer allows the installer to know whether the PV modules are 100% operational. The installed modules can be properly matched to maximize performance. Once installed, the whole system needs to be characterized similarly to detect mismatches, partial shading, or installation damage before energizing the system. This will prevent any reliability issues from the onset and ensure the system efficiency will remain high. A capacitive load is implemented in making I-V curve measurements with the goal of minimizing the curve tracer volume and cost. Additionally, the increase of measurement resolution and accuracy is possible via the use of accurate voltage and current measurement methods and accurate PV models to translate the curves to standard testing conditions. A move from mechanical relays to solid-state MOSFETs improved system reliability while significantly reducing device volume and costs. Finally, emulating PV modules is necessary for testing electrical components of a PV system. PV emulation simplifies and standardizes the tests allowing for different irradiance, temperature and partial shading levels to be easily tested. Proper emulation of PV modules requires an accurate and mathematically simple PV model that incorporates all known system variables so that any PV module can be emulated as the design requires. A non-synchronous buck converter is proposed for the emulation of a single, high-power PV module using traditional silicon devices. With the proof-of-concept working and improvements in efficiency, power density and steady-state errors made, dynamic tests were performed using an inverter connected to the PV emulator. In order to improve the dynamic characteristics, a synchronous buck converter topology is proposed along with the use of advanced GaNFET devices which resulted in very high power efficiency and improved dynamic response characteristics when emulating PV modules.
YO-3A acoustics research aircraft systems manual
NASA Technical Reports Server (NTRS)
Cross, J. L.
1984-01-01
The flight testing techniques, equipment, and procedures employed during air-to-air acoustic testing of helicopters using the NASA YO-3A Acoustic Research Aircraft are discussed. The research aircraft instrumentation system is described as well as hardware installation on the test aircraft and techniques used during the tests. Emphasis is placed on formation flying, position locations, test matrices, and test procedures.
Subscriber Response System. Progress Report.
ERIC Educational Resources Information Center
Callais, Richard T.
Results of preliminary tests made prior and subsequent to the installation of a two-way interactive communication system which involves a computer complex termed the Local Processing Center and subscriber terminals located in the home or business location are reported. This first phase of the overall test plan includes tests made at Theta-Com…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Smith, J.; Mowrey, J.
1995-12-01
This report describes the design, development and testing of process controls for selected system operations in the Browns Ferry Nuclear Plant (BFNP) Reactor Water Cleanup System (RWCU) using a Computer Simulation Platform which simulates the RWCU System and the BFNP Integrated Computer System (ICS). This system was designed to demonstrate the feasibility of the soft control (video touch screen) of nuclear plant systems through an operator console. The BFNP Integrated Computer System, which has recently. been installed at BFNP Unit 2, was simulated to allow for operator control functions of the modeled RWCU system. The BFNP Unit 2 RWCU systemmore » was simulated using the RELAP5 Thermal/Hydraulic Simulation Model, which provided the steady-state and transient RWCU process variables and simulated the response of the system to control system inputs. Descriptions of the hardware and software developed are also included in this report. The testing and acceptance program and results are also detailed in this report. A discussion of potential installation of an actual RWCU process control system in BFNP Unit 2 is included. Finally, this report contains a section on industry issues associated with installation of process control systems in nuclear power plants.« less
Testing the Model Installation Program in the Tactical Air Command: 1984-1986.
1988-04-01
Installation Program was the brain child at Mr. Robert A. Stone. Deputy Assistant Secretary at Detense tor Manpower and Logistics. Mr. Stone was...what a - orn - , mnader can do when relieved from overly restrictive reguiations. L irtland needed a new electronic printing system. They received a
77 FR 9518 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-17
...) Installation of New Relay and Wiring Bundle Within 72 months after the effective date of this AD: Change the... and temperature control system (CACTCS). This AD requires doing certain wiring changes, installing a new relay and necessary wiring in the CACTCS, and performing an operational test of the cooling pack...
Analysis of results from wind tunnel tests of inlets for an advanced turboprop nacelle installation
NASA Technical Reports Server (NTRS)
Hancock, J. P.; Lyman, V.; Pennock, A. P.
1986-01-01
Inlets for tractor installations of advanced turboprop propulsion systems were tested in three phases, covering a period from November, 1982 to January, 1984. Nacelle inlet configuration types included single scoop, twin scoop, and annular arrangements. Tests were performed with and without boundary layer diverters and several different diverter heights were tested for the single scoop inlet. This same inlet was also tested at two different axial positions. Test Mach numbers ranged from Mach 0.20 to 0.80. Types of data taken were: (1) internal and external pressures, including inlet throat recoveries; (2) balance forces, including thrust-minus-drag; and (3) propellar blade stresses.
Diagnosing Trouble Spots Caused by an Irrigation System
John R. Scholtes
2002-01-01
I discuss a testing procedure to determine the water distribution pattern of a sprinkler irrigation system and steps that may be taken to improve uniformity of application. All irrigation systems require testing and maintenance to assure that water application is as uniform as possible. Even new systems installed to a manufacturer's specifications should be "...
40 CFR 76.14 - Monitoring, recordkeeping, and reporting.
Code of Federal Regulations, 2014 CFR
2014-07-01
... installed NOX emission control system to the owner or operator showing that such system was designed to meet... performance of the NOX emission control system that were not included in the design specifications and... control system during the demonstration period. The tests shall include tests in § 76.15, which may be...
40 CFR 76.14 - Monitoring, recordkeeping, and reporting.
Code of Federal Regulations, 2013 CFR
2013-07-01
... installed NOX emission control system to the owner or operator showing that such system was designed to meet... performance of the NOX emission control system that were not included in the design specifications and... control system during the demonstration period. The tests shall include tests in § 76.15, which may be...
2007-02-16
KENNEDY SPACE CENTER, FLA. -- Inside the Space Station Processing Facility at Kennedy Space Center, workers prepare the Remote Manipulator System, or robotic arm, for installation on the Japanese Experiment Module for testing. The RMS is one of the payloads scheduled to be delivered to the station on a future mission tentatively scheduled for 2008. The RMS is similar to the robotic arm already installed on the station's mobile base system. Photo credit: NASA/Amanda Diller
Aerodynamic Flight-Test Results for the Adaptive Compliant Trailing Edge
NASA Technical Reports Server (NTRS)
Cumming, Stephen B.; Smith, Mark S.; Ali, Aliyah N.; Bui, Trong T.; Ellsworth, Joel C.; Garcia, Christian A.
2016-01-01
The aerodynamic effects of compliant flaps installed onto a modified Gulfstream III airplane were investigated. Analyses were performed prior to flight to predict the aerodynamic effects of the flap installation. Flight tests were conducted to gather both structural and aerodynamic data. The airplane was instrumented to collect vehicle aerodynamic data and wing pressure data. A leading-edge stagnation detection system was also installed. The data from these flights were analyzed and compared with predictions. The predictive tools compared well with flight data for small flap deflections, but differences between predictions and flight estimates were greater at larger deflections. This paper describes the methods used to examine the aerodynamics data from the flight tests and provides a discussion of the flight-test results in the areas of vehicle aerodynamics, wing sectional pressure coefficient profiles, and air data.
Solar energy system performance evaluation: Seasonal report for fern, Tunkhannock, Pennsylvania
NASA Technical Reports Server (NTRS)
1980-01-01
The operational and thermal performance of a variety of solar systems installed in operational test sites are described. The analysis is based on instrumented system data monitored and collected for at least one full season of operation. The long-term field performance of the installed system is reported, and technical contributions to the definition of techniques and requirements for solar energy system design are made. The solar energy system was designed to supply space heating and domestic hot water for single-family residences. The system consists of air flat plate collectors, storage tank, pumps, heat exchangers, associated plumbing, and controls.
NASA Technical Reports Server (NTRS)
1980-01-01
Installation procedures for the single family residential solar heating system at the William O'Brien State Park, Stillwater, Minnesota, are presented. The system is a solar-assisted, hydronic-to-warm-air system with solar-assisted domestic water heating. It is composed of the following major components: liquid cooled flat plate collectors; water storage tank; passive solar-fired domestic water preheater; electric hot water heater; heat pump with electric backup; solar hot water coil unit; tube-and-shell heat exchanger, three pumps, and associated pipes and valving in an energy transport module; control system; and air-cooled heat purge unit. Installer guidelines are provided for each subsystem and includes testing and filling the system. Information is also given on the operating procedures, controls, caution requirements and routine and schedule maintenance.
Brake control system modification, augmentor Wing Jet STOL Research Airplane (AWJSRA)
NASA Technical Reports Server (NTRS)
Amberg, R. L.; Arline, J. A.; Jenny, R. W.
1974-01-01
The braking system for a short takeoff aircraft is discussed and the deficiencies are described. The installation of a Boeing 727 aircraft brake system was made to correct the deficiencies. Tests of the modified system were conducted using an analog computer/hardware simulator. Actual performance tests were conducted and the characteristics of the system were satisfactory.
Solar Refrigerator/Freezers For Vaccines
NASA Technical Reports Server (NTRS)
Ratajczak, Anthony F.
1988-01-01
Report presents results of field tests of solar-cell-powered refrigerator/freezers for vaccines. Covers following topics: explanation of project; descriptions of refrigerator/freezer systems; account of installation experiences; performance data for 22 systems for which field-test data reported; summary of operational reliability; comments of users of some systems tested; and recommendations for design and future use. Photovoltaic systems store vaccines in remote regions where powerlines unavailable.
A new bipolar Qtrim power supply system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mi, C.; Bruno, D.; Drozd, J.
2015-05-03
This year marks the 15th run of RHIC (Relativistic Heavy Ion Collider) operations. The reliability of superconducting magnet power supplies is one of the essential factors in the entire accelerator complex. Besides maintaining existing power supplies and their associated equipment, newly designed systems are also required based on the physicist’s latest requirements. A bipolar power supply was required for this year’s main quadruple trim power supply. This paper will explain the design, prototype, testing, installation and operation of this recently installed power supply system.
Acceptance testing and commissioning of Kodak Directview CR-850 digital radiography system.
Bezak, E; Nelligan, R A
2006-03-01
This Technical Paper describes Acceptance Testing and Commissioning of the Kodak DirectView CR-850 digital radiography system installed at the Royal Adelaide Hospital. The first of its type installed in Australia, the system is a "dry" image processor, for which no chemicals are required to develop images. Rather, latent radiographic images are stored on photostimulable phosphor screens, which are scanned and displayed by a reader unit. The image can be digitally processed and enhanced before it is forwarded to a storage device, printer or workstation display, thereby alleviating the need to re-expose patients to achieve satisfactory quality images. The phosphor screens are automatically erased, ready for re-use. Results are reported of tests carried out using the optional "Total Quality Tool" quality assurance package installed with the system. This package includes analysis and reporting software which provides for simple testing and reporting of many important characteristics of the system, such as field uniformity, aspect ratio, line and pixel positions, image and system noise, exposure response, scan linearity, modulation transfer function (MTF) and image artefacts. Acceptance Tests were performed for kV and MV exposures. Resolution for MV exposures was at least 0.8 l/mm, and measured phantom dimensions were within 1.05% of expected magnification. Reproducibility between cassettes was within 1.6%. The mean pixel values on the central axis were close to linear for MV exposures from 3 to 10 MU and reached saturation level at around 20 MU for 6 MV and around 30 MV for 23 MV beams. Noise levels were below 0.2 %.
Prototype solar heating and cooling systems
NASA Technical Reports Server (NTRS)
1978-01-01
Eight prototype systems were developed. The systems are 3, 25, and 75-ton size units. The manufacture, test, installation, maintenance, problem resolution, and performance evaluation of the systems is described. Size activities for the various systems are included.
47 CFR 27.1164 - The cost-sharing formula.
Code of Federal Regulations, 2010 CFR
2010-10-01
... control equipment; engineering costs (design/path survey); installation; systems testing; FCC filing costs; site acquisition and civil works; zoning costs; training; disposal of old equipment; test equipment... a replacement system, such as equipment and engineering expenses. C may not exceed $250,000 per...
Integrated Component-based Data Acquisition Systems for Aerospace Test Facilities
NASA Technical Reports Server (NTRS)
Ross, Richard W.
2001-01-01
The Multi-Instrument Integrated Data Acquisition System (MIIDAS), developed by the NASA Langley Research Center, uses commercial off the shelf (COTS) products, integrated with custom software, to provide a broad range of capabilities at a low cost throughout the system s entire life cycle. MIIDAS combines data acquisition capabilities with online and post-test data reduction computations. COTS products lower purchase and maintenance costs by reducing the level of effort required to meet system requirements. Object-oriented methods are used to enhance modularity, encourage reusability, and to promote adaptability, reducing software development costs. Using only COTS products and custom software supported on multiple platforms reduces the cost of porting the system to other platforms. The post-test data reduction capabilities of MIIDAS have been installed at four aerospace testing facilities at NASA Langley Research Center. The systems installed at these facilities provide a common user interface, reducing the training time required for personnel that work across multiple facilities. The techniques employed by MIIDAS enable NASA to build a system with a lower initial purchase price and reduced sustaining maintenance costs. With MIIDAS, NASA has built a highly flexible next generation data acquisition and reduction system for aerospace test facilities that meets customer expectations.
Technical Assessment of the Transette Transit System
DOT National Transportation Integrated Search
1981-10-01
This report describes an assessment of the Transette system located at the Georgia Institute of Technology in Atlanta, Georgia. The Transette system is a unique, fully-automated, engineering prototype transportation test system installed on the campu...
Tests of Fire Suppression Effectiveness of Damaged Water Mist Systems
2014-05-01
essure the damage pi essure is installed in the test compa Damage pipe no essur Pipe 7 104.9 12.9 31.0 22.0 132.5...pipe is installed in the test compartment, see Figure 68 Damage pipe no. Total [L/ Pr no [ba r u [ba v r [b a ea [L flow min] essure at rth...nozzle r] P so essure at th nozzle r] A p erage essure ar] C l lculated k flow /min] Pipe 4 104 35 23 29 66.9 .6 .8 .7 .5
Solar energy system performance evaluation: Seasonal report for SEMCO, Loxahatchee, Florida
NASA Technical Reports Server (NTRS)
1980-01-01
The operational and thermal performance of a variety of solar systems installed in operational test sites are described. The analysis used is based on instrumented system data monitored and collected for at least one full season of operation. The long-term field performance of the installed system and the technical contributions to the definition of techniques and requirements solar energy system design are analyzed. The solar energy system was designed to supply domestic hot water for a family of four, single-family residences. It consists of two liquid flat plate collectors, single tank, controls, and transport lines.
47 CFR 24.243 - The cost-sharing formula.
Code of Federal Regulations, 2010 CFR
2010-10-01
...; monitoring or control equipment; engineering costs (design/path survey); installation; systems testing; FCC filing costs; site acquisition and civil works; zoning costs; training; disposal of old equipment; test...
Hanford Waste End Effector Phase I Test Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Berglin, Eric J.; Hatchell, Brian K.; Mount, Jason C.
This test plan describes the Phase 1 testing program of the Hanford Waste End Effector (HWEE) at the Washington River Protection Solutions’ Cold Test Facility (CTF) using a Pacific Northwest National Laboratory (PNNL)-designed testing setup. This effort fulfills the informational needs for initial assessment of the HWEE to support Hanford single-shell tank A-105 retrieval. This task will install the HWEE on a PNNL-designed robotic gantry system at CTF, install and calibrate instrumentation to measure reaction forces and process parameters, prepare and characterize simulant materials, and implement the test program. The tests will involve retrieval of water, sludge, and hardpan simulantsmore » to determine pumping rate, dilution factors, and screen fouling rate.« less
Passive Seismic Monitoring for Rockfall at Yucca Mountain: Concept Tests
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cheng, J; Twilley, K; Murvosh, H
2003-03-03
For the purpose of proof-testing a system intended to remotely monitor rockfall inside a potential radioactive waste repository at Yucca Mountain, a system of seismic sub-arrays will be deployed and tested on the surface of the mountain. The goal is to identify and locate rockfall events remotely using automated data collecting and processing techniques. We install seismometers on the ground surface, generate seismic energy to simulate rockfall in underground space beneath the array, and interpret the surface response to discriminate and locate the event. Data will be analyzed using matched-field processing, a generalized beam forming method for localizing discrete signals.more » Software is being developed to facilitate the processing. To date, a three-component sub-array has been installed and successfully tested.« less
Solar heating and cooling demonstration project at the Florida solar energy center
NASA Technical Reports Server (NTRS)
1980-01-01
The retrofitted solar heating and cooling system installed at the Florida Solar Energy Center is described. The system was designed to supply approximately 70 percent of the annual cooling and 100 percent of the heating load. The project provides unique high temperature, nonimaging, nontracking, evacuated tube collectors. The design of the system was kept simple and employs five hydronic loops. They are energy collection, chilled water production, space cooling, space heating and energy rejection. Information is provided on the system's acceptance test results operation, controls, hardware and installation, including detailed drawings.
NASA Technical Reports Server (NTRS)
2003-01-01
KENNEDY SPACE CENTER, FLA. -- In the Orbiter Processing Facility, United Space Alliance employee Mike Cote installs Thermal Protection System tiles on a test panel. The test panel and sections of Space Shuttle orbiter Enterprise (OV-101) will be transferred to the Southwest Research Institute for testing after the tile installation is complete. The testing has been requested by the Columbia Accident Investigation Board. Sections of Enterprise were borrowed from the Smithsonian Institution's Air and Space Museum where the orbiter is being stored at the Washington Dulles International Airport. Enterprise was the first orbiter built in the Shuttle fleet and was used to conduct the Approach and Landing Test Program before the first powered Shuttle flight.
Code of Federal Regulations, 2014 CFR
2014-07-01
... Standards for Hazardous Air Pollutants for Engine Test Cells/Stands General Compliane Requirements § 63.9306... at all times that an engine test cell/stand is operating, except during monitoring malfunctions... engine test cell/stand is operating. You must inspect the automatic shutdown system at least once every...
Code of Federal Regulations, 2013 CFR
2013-07-01
... Standards for Hazardous Air Pollutants for Engine Test Cells/Stands General Compliane Requirements § 63.9306... at all times that an engine test cell/stand is operating, except during monitoring malfunctions... engine test cell/stand is operating. You must inspect the automatic shutdown system at least once every...
Space Suit Portable Life Support System (PLSS) 2.0 Pre-Installation Acceptance (PIA) Testing
NASA Technical Reports Server (NTRS)
Watts, Carly; Vogel, Matthew
2016-01-01
Following successful completion of the space suit Portable Life Support System (PLSS) 1.0 development and testing in 2011, the second system-level prototype, PLSS 2.0, was developed in 2012 to continue the maturation of the advanced PLSS design which is intended to reduce consumables, improve reliability and robustness, and incorporate additional sensing and functional capabilities over the current Space Shuttle/International Space Station Extravehicular Mobility Unit (EMU) PLSS. PLSS 2.0 represents the first attempt at a packaged design comprising first generation or later component prototypes and medium fidelity interfaces within a flight-like representative volume. Pre-Installation Acceptance (PIA) is carryover terminology from the Space Shuttle Program referring to the series of test sequences used to verify functionality of the EMU PLSS prior to installation into the Space Shuttle airlock for launch. As applied to the PLSS 2.0 development and testing effort, PIA testing designated the series of 27 independent test sequences devised to verify component and subsystem functionality, perform in situ instrument calibrations, generate mapping data to define set-points for control algorithms, evaluate hardware performance against advanced PLSS design requirements, and provide quantitative and qualitative feedback on evolving design requirements and performance specifications. PLSS 2.0 PIA testing was carried out from 3/20/13 - 3/15/14 using a variety of test configurations to perform test sequences that ranged from stand-alone component testing to system-level testing, with evaluations becoming increasingly integrated as the test series progressed. Each of the 27 test sequences was vetted independently, with verification of basic functionality required before completion. Because PLSS 2.0 design requirements were evolving concurrently with PLSS 2.0 PIA testing, the requirements were used as guidelines to assess performance during the tests; after the completion of PIA testing, test data served to improve the fidelity and maturity of design requirements as well as plans for future advanced PLSS functional testing.
Space Suit Portable Life Support System (PLSS) 2.0 Pre-Installation Acceptance (PIA) Testing
NASA Technical Reports Server (NTRS)
Anchondo, Ian; Cox, Marlon; Meginnis, Carly; Westheimer, David; Vogel, Matt R.
2016-01-01
Following successful completion of the space suit Portable Life Support System (PLSS) 1.0 development and testing in 2011, the second system-level prototype, PLSS 2.0, was developed in 2012 to continue the maturation of the advanced PLSS design. This advanced PLSS is intended to reduce consumables, improve reliability and robustness, and incorporate additional sensing and functional capabilities over the current Space Shuttle/International Space Station Extravehicular Mobility Unit (EMU) PLSS. PLSS 2.0 represents the first attempt at a packaged design comprising first generation or later component prototypes and medium fidelity interfaces within a flight-like representative volume. Pre-Installation Acceptance (PIA) is carryover terminology from the Space Shuttle Program referring to the series of test sequences used to verify functionality of the EMU PLSS prior to installation into the Space Shuttle airlock for launch. As applied to the PLSS 2.0 development and testing effort, PIA testing designated the series of 27 independent test sequences devised to verify component and subsystem functionality, perform in situ instrument calibrations, generate mapping data, define set-points, evaluate control algorithms, evaluate hardware performance against advanced PLSS design requirements, and provide quantitative and qualitative feedback on evolving design requirements and performance specifications. PLSS 2.0 PIA testing was carried out in 2013 and 2014 using a variety of test configurations to perform test sequences that ranged from stand-alone component testing to system-level testing, with evaluations becoming increasingly integrated as the test series progressed. Each of the 27 test sequences was vetted independently, with verification of basic functionality required before completion. Because PLSS 2.0 design requirements were evolving concurrently with PLSS 2.0 PIA testing, the requirements were used as guidelines to assess performance during the tests; after the completion of PIA testing, test data served to improve the fidelity and maturity of design requirements as well as plans for future advanced PLSS functional testing.
An inexpensive economical solar heating system for homes
NASA Technical Reports Server (NTRS)
Allred, J. W.; Shinn, J. M., Jr.; Kirby, C. E.; Barringer, S. R.
1976-01-01
A low-cost solar home heating system to supplement existing warm-air heating systems is described. The report is written in three parts: (1) a brief background on solar heating, (2) experience with a demonstration system, and (3) information for the homeowner who wishes to construct such a system. Instructions are given for a solar heating installation in which the homeowner supplies all labor necessary to install off-the-shelf components estimated to cost $2,000. These components, which include solar collector, heat exchanger, water pump, storage tank, piping, and controls to make the system completely automatic, are available at local lumber yards, hardware stores, and plumbing supply stores, and are relatively simple to install. Manufacturers and prices of each component used and a rough cost analysis based on these prices are included. This report also gives performance data obtained from a demonstration system which was built and tested at the Langley Research Center.
Prototype Engineered Barrier System Field Test (PEBSFT); Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ramirez, A.L.; Buscheck, T.; Carlson, R.
1991-08-01
This final report represents a summary of data and interpretations obtained from the Prototype Engineered Barrier System Field Test (PEBSFT) performed in G-Tunnel within the Nevada Test Site. The PEBSFT was conducted to evaluate the applicability of measurement techniques, numerical models, and procedures developed for future field tests that will be conducted in the Exploratory Studies Facilities (ESF) at Yucca Mountain. The primary objective of the test was to provide a basis for determining whether tests planned for the ESF have the potential to be successful. Chapter 1 on high frequency electromagnetic tomography discusses the rock mass electromagnetic permittivity andmore » attenuation rate changes that were measured to characterize the water distribution in the near field of a simulated waste container. The data are used to obtain quantitative estimates of how the moisture content in the rock mass changes during heating and to infer properties of the spatial variability of water distribution, leading to conclusions about the role of fractures in the system. Chapter 2 discusses the changes in rock moisture content detected by the neutron logging probe. Chapter 3 permeability tests discusses the characterization of the in-situ permeability of the fractured tuff around the borehole. The air permeability testing apparatus, the testing procedures, and the data analysis are presented. Chapter 4 describes the moisture collection system installed in the heater borehole to trap and measure the moisture volumes. Chapter 5 describes relative humidity measurements made with the thermocouple psychrometer and capacitance sensors. Chapter 6 discusses gas pressure measurements in the G-Tunnel, addressing the calibration and installation of piezoresistive-gaged transducers. Chapter 7 describes the calibration and installation of thermocouples for temperature measurements. Chapter 8 discusses the results of the PEBSFT.« less
Prototype solar heating and combined heating and cooling systems
NASA Technical Reports Server (NTRS)
1976-01-01
Eight prototype solar heating and combined heating and cooling systems are considered. This effort includes development, manufacture, test, installation, maintenance, problem resolution, and performance evaluation.
2003-12-19
Orion Capsule and Launch Abort System (LAS) installed in the NASA Glenn 8x6 Supersonic Wind Tunnel for testing. This test is an Aero Acoustic test of the LAS. Pictured is the calibration of the model's angle of attack
2003-12-19
Orion Capsule and Launch Abort System (LAS) installed in the NASA Glenn 8x6 Supersonic Wind Tunnel for testing. This test is an Aero Acoustic test of the LAS. Pictured is the calibration of the model's angle of attack
40 CFR 60.2165 - What monitoring equipment must I install and what parameters must I monitor?
Code of Federal Regulations, 2013 CFR
2013-07-01
... installed in each baghouse compartment or cell. For negative pressure or induced air fabric filters, the bag... test. (g) For waste-burning kilns not equipped with a wet scrubber, in place of hydrogen chloride..., maintain, and operate a continuous emission monitoring system for monitoring hydrogen chloride emissions...
16 CFR § 1211.13 - Inherent force activated secondary door sensors.
Code of Federal Regulations, 2013 CFR
2013-01-01
... sensors. § 1211.13 Section § 1211.13 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION CONSUMER... Standard § 1211.13 Inherent force activated secondary door sensors. (a) Normal operation test. (1) A force activated door sensor of a door system installed according to the installation instructions shall actuate...
Core Stage Forward Skirt Umbilical Installation onto Mobile Launcher
2017-06-29
Just north of the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, the core stage forward skirt umbilical is installed on the mobile launcher. The mobile launcher is designed to support the assembly, testing and check-out of the agency's Space Launch System (SLS) rocket and the Orion spacecraft.
Core Stage Forward Skirt Umbilical Installation onto Mobile Laun
2017-06-30
Just north of the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, the core stage forward skirt umbilical is installed on the mobile launcher. The mobile launcher is designed to support the assembly, testing and check-out of the agency's Space Launch System (SLS) rocket and the Orion spacecraft.
Core Stage Forward Skirt Umbilical Installation onto Mobile Laun
2017-06-30
Just north of the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, a crane lifts the core stage forward skirt umbilical for installation onto the mobile launcher. The mobile launcher is designed to support the assembly, testing and check-out of the agency's Space Launch System (SLS) rocket and the Orion spacecraft.
Core Stage Forward Skirt Umbilical Installation onto Mobile Laun
2017-06-30
Just north of the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, technicians install the core stage forward skirt umbilical on the mobile launcher. The mobile launcher is designed to support the assembly, testing and check-out of the agency's Space Launch System (SLS) rocket and the Orion spacecraft.
DOT National Transportation Integrated Search
2011-02-01
A new method of cable installation using a heavy-duty Cone Penetration Test : (CPT) truck was developed and practiced successfully in this study. The coaxial and fiber : optic cables were pushed along with the cone rods by the hydraulic system integr...
Acoustic Flow Monitor System - User Manual
LaHusen, Richard
2005-01-01
INTRODUCTION The Acoustic Flow Monitor (AFM) is a portable system that was designed by the U.S. Geological Survey Cascades Volcano Observatory to detect and monitor debris flows associated with volcanoes. It has been successfully used internationally as part of real-time warning systems in valleys threatened by such flows (Brantley, 1990; Marcial and others, 1996; Lavigne and others, 2000). The AFM system has also been proven to be an effective tool for monitoring some non-volcanic debris flows. This manual is intended to serve as a basic guide for the installation, testing, and maintenance of AFM systems. An overview of how the system works, as well as instructions for installation and guidelines for testing, is included. Interpretation of data is not covered in this manual; rather, the user should refer to the references provided for published examples of AFM data.
Prototype solar heating and combined heating and cooling systems
NASA Technical Reports Server (NTRS)
1977-01-01
Eight prototype solar heating and combined heating and cooling systems are being developed. The effort includes development, manufacture, test, installation, maintenance, problem resolution, and performance evaluation.
Solar heating and cooling system design and development
NASA Technical Reports Server (NTRS)
1978-01-01
The development of eight prototype solar heating and combined heating and cooling systems is reported. Manufacture, test, installation, maintenance, problem resolution, and monitoring the operation of prototype systems is included. Heating and cooling equipment for single family residential and commercial applications and eight operational test sites (four heating and four heating and cooling) is described.
The report gives results of follow-up tests in 38 difficult- to-mitigate Pennsylvania houses where indoor radon reduction systems had been installed 2 to 4 years earlier. bjectives were to assess system durability, methods for improving performance, and methods for reducing insta...
Subscriber Response System; El Segundo Interim Test Report.
ERIC Educational Resources Information Center
Callais, Richard T.
A new cable television system, called the Subscriber Response System (SRS), is being tested prior to a trial installation in El Segundo, California. The components include two bidirectional cables, a computer for processing subscribers' requests, and subscriber terminals to be located in homes or offices. The home terminal includes a three-digit…
Apollo Contour Rocket Nozzle in the Propulsion Systems Laboratory
1964-07-21
Bill Harrison and Bud Meilander check the setup of an Apollo Contour rocket nozzle in the Propulsion Systems Laboratory at the National Aeronautics and Space Administration (NASA) Lewis Research Center. The Propulsion Systems Laboratory contained two 14-foot diameter test chambers that could simulate conditions found at very high altitudes. The facility was used in the 1960s to study complex rocket engines such as the Pratt and Whitney RL-10 and rocket components such as the Apollo Contour nozzle, seen here. Meilander oversaw the facility’s mechanics and the installation of test articles into the chambers. Harrison was head of the Supersonic Tunnels Branch in the Test Installations Division. Researchers sought to determine the impulse value of the storable propellant mix, classify and improve the internal engine performance, and compare the results with analytical tools. A special setup was installed in the chamber that included a device to measure the thrust load and a calibration stand. Both cylindrical and conical combustion chambers were examined with the conical large area ratio nozzles. In addition, two contour nozzles were tested, one based on the Apollo Service Propulsion System and the other on the Air Force’s Titan transtage engine. Three types of injectors were investigated, including a Lewis-designed model that produced 98-percent efficiency. It was determined that combustion instability did not affect the nozzle performance. Although much valuable information was obtained during the tests, attempts to improve the engine performance were not successful.
Comparison of Angle of Attack Measurements for Wind Tunnel Testing
NASA Technical Reports Server (NTRS)
Jones, Thomas, W.; Hoppe, John C.
2001-01-01
Two optical systems capable of measuring model attitude and deformation were compared to inertial devices employed to acquire wind tunnel model angle of attack measurements during the sting mounted full span 30% geometric scale flexible configuration of the Northrop Grumman Unmanned Combat Air Vehicle (UCAV) installed in the NASA Langley Transonic Dynamics Tunnel (TDT). The overall purpose of the test at TDT was to evaluate smart materials and structures adaptive wing technology. The optical techniques that were compared to inertial devices employed to measure angle of attack for this test were: (1) an Optotrak (registered) system, an optical system consisting of two sensors, each containing a pair of orthogonally oriented linear arrays to compute spatial positions of a set of active markers; and (2) Video Model Deformation (VMD) system, providing a single view of passive targets using a constrained photogrammetric solution whose primary function was to measure wing and control surface deformations. The Optotrak system was installed for this test for the first time at TDT in order to assess the usefulness of the system for future static and dynamic deformation measurements.
Ground and flight test results of a total main rotor isolation system
NASA Technical Reports Server (NTRS)
Halwes, Dennis R.
1987-01-01
A six degree-of-freedom (DOF) isolation system using six LIVE units has been installed under an Army/NASA contract on a Bell 206LM helicopter. This system has been named the Total Rotor Isolation System, or TRIS. To determine the effectiveness of TRIS in reducing helicopter vibration, a flight verification study was conducted at Bell's Flight Research Center in Arlington, Texas. The flight test data indicate that the 4/rev vibration level at the pilot's seat were suppressed below the 0.04g level throughout the transition envelope. Flight tests indicate over 95% suppression of vibration level from the rotor hub to the pilot's seat. The TRIS installation was designed with a decoupled control system and has shown a significant improvement in aircraft flying qualities, such that it permitted the trimmed aircraft to be flown hands-off for a significant period of time, over 90 seconds. The TRIS flight test program has demonstrated a system that greatly reduces vibration levels of a current-generation helicopter, while significantly improving the flying qualities to a point where stability augmentation is no longer a requirement.
M/A-COM linkabit eastern operations
NASA Astrophysics Data System (ADS)
Mills, D. L.; Avramovic, Z.
1983-03-01
This first Quarterly Project Report on LINKABIT's contribution to the Defense Advanced Research Projects Agency (DARPA) Internet Program covers the period from 22 December 1982 through 21 March 1983. LINKABIT's support of the Internet Program is concentrated in the areas of protocol design, implementation, testing, and evaluation. In addition, LINKABIT staff are providing integration and support services for certain computer systems to be installed at DARPA sites in Washington, D.C., and Stuttgart, West Germany. During the period covered by this report, LINKABIT organized the project activities and established staff responsibilities. Several computers and peripheral devices were made available from Government sources for use in protocol development and network testing. Considerable time was devoted to installing this equipment, integrating the software, and testing it with the Internet system.
Vanguard/PLACE experiment system design and test plan
NASA Technical Reports Server (NTRS)
Taylor, R. E.
1973-01-01
The design, development, and testing of the NASA-GFSC Position Location and Aircraft Communications Equipment (PLACE) at C band frequency are discussed. The equipment was installed on the USNS Vanguard. The tests involved a sea test to evalute the position-location, 2-way voice, and 2-way data communications capability of PLACE and a trilateration test to position-fix the ATS-5 satellite using the PLACE system.
18. Interior view of HVAC room in Components Test Laboratory ...
18. Interior view of HVAC room in Components Test Laboratory (T-27), showing northwest corner. Photograph shows upgraded instrumentation, piping, and technological modifications for HVAC system installed in 1997-99 to accommodate component testing requirements for the Atlas V missile. - Air Force Plant PJKS, Systems Integration Laboratory, Components Test Laboratory, Waterton Canyon Road & Colorado Highway 121, Lakewood, Jefferson County, CO
19. Interior view of HVAC room in Components Test Laboratory ...
19. Interior view of HVAC room in Components Test Laboratory (T-27), looking toward east wall. Photograph shows upgraded instrumentation, machinery, and technological modifications for HVAC system installed in 1997-99 to accommodate component testing requirements for the Atlas V missile. - Air Force Plant PJKS, Systems Integration Laboratory, Components Test Laboratory, Waterton Canyon Road & Colorado Highway 121, Lakewood, Jefferson County, CO
DOE Office of Scientific and Technical Information (OSTI.GOV)
Carter, R.J.
1997-04-01
The primary purpose of the "modification and validation of an automotive data processing unit (DPU), compressed video system, and communications equipment" cooperative research and development agreement (CRADA) was to modify and validate both hardware and software, developed by Scientific Atlanta, Incorporated (S-A) for defense applications (e.g., rotary-wing airplanes), for the commercial sector surface transportation domain (i.e., automobiles and trucks). S-A also furnished a state-of-the-art compressed video digital storage and retrieval system (CVDSRS), and off-the-shelf data storage and transmission equipment to support the data acquisition system for crash avoidance research (DASCAR) project conducted by Oak Ridge National Laboratory (ORNL). In turn,more » S-A received access to hardware and technology related to DASCAR. DASCAR was subsequently removed completely and installation was repeated a number of times to gain an accurate idea of complete installation, operation, and removal of DASCAR. Upon satisfactory completion of the DASCAR construction and preliminary shakedown, ORNL provided NHTSA with an operational demonstration of DASCAR at their East Liberty, OH test facility. The demonstration included an on-the-road demonstration of the entire data acquisition system using NHTSA'S test track. In addition, the demonstration also consisted of a briefing, containing the following: ORNL generated a plan for validating the prototype data acquisition system with regard to: removal of DASCAR from an existing vehicle, and installation and calibration in other vehicles; reliability of the sensors and systems; data collection and transmission process (data integrity); impact on the drivability of the vehicle and obtrusiveness of the system to the driver; data analysis procedures; conspicuousness of the vehicle to other drivers; and DASCAR installation and removal training and documentation. In order to identify any operational problems not captured by the systems testing and evaluation, the validation plan also addressed a short-term pilot research program to manipulate DASCAR under operational conditions using "naive" drivers. The effort exercised the fill capabilities of the data acquisition system. ORNL subsequently evaluated and pilot tested the data acquisition system using the validation plan. The plan was implemented in full at the NHTSA East Liberty, OH test facility, and was carried out as a cooperative effort with the Vehicle Research and Test Center staff. ORNL determined the reliability of the sensors and systems by exercising DASCAR For one vehicle type, ORNL evaluated systems reliability over a continuous period of 30 days with particular attention paid to maintenance of calibration and data integrity.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Burnham, Laurie; Lave, Matthew Samuel; Stein, Joshua
This report provides a preliminary (three month) analysis for the SolarWorld system installed at the New Mexico Regional Test Center (RTC.) The 8.7kW, four-string system consists of four module types): bifacial, mono-crystalline, mono-crystalline glass-glass and polycrystalline. Overall, the SolarWorld system has performed well to date: most strings closely match their specification-sheet module temperature coefficients and Sandia 's f lash tests show that Pmax values are well within expectations. Although the polycrystalline modules underperformed, the results may be a function of light exposure, as well as mismatch within the string, and not a production flaw. The instantaneous bifacial gains for SolarWorldmore » 's Bisun modules were modest but it should be noted that the RTC racking is not optimized for bifacial modules, nor is albedo optimized at the site. Additional analysis, not only of the SolarWorld installation in New Mexico but of the SolarWorld installations at the Vermont and Florida RTCs will be provide much more information regarding the comparative performance of the four module types.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Winter, J.R.; Keywood, S.S.
PTFE-based gaskets in chemical plant service typically fail in an extrusion mode, sometimes referred to as blowout. Test work previously published by Monsanto indicated that correctly installed PTFE-based gaskets have pressure performance far exceeding system pressure ratings. These results have since been confirmed by extensive testing at the Montreal based Ecole Polytechnique Tightness Testing and Research Laboratory (TTRL), funded by a consortium of gasket users and manufacturers. With the knowledge that properly installed gaskets can withstand system pressures in excess of 1,000 psig [6,894 kPa], failures at two chemical plants were re-examined. This analysis indicates that extrusion type failures canmore » be caused by excessive internal pressures, associated with sections of pipe having an external source of heat coincident with a blocked flow condition. This results in high system pressures which explain the extrusion type failures observed. The paper discusses details of individual failures and examines methods to prevent them. Other causes for extrusion failures are reviewed, with a recommendation that stronger gasket materials not be utilized to correct problems until it is verified that excessive pressure build-up is not the problem. Also summarized are the requirements for proper installation to achieve the potential blowout resistance found in these gaskets.« less
Solar heating and cooling system design and development
NASA Technical Reports Server (NTRS)
1978-01-01
The progress made in the manufacture, test, evaluation, installation, problem resolution, performance evaluation, and development of eight prototype solar heating and combined heating and cooling systems is described.
Dispersed storage and generation case studies
NASA Technical Reports Server (NTRS)
Bahrami, K.; Stallkamp, J. A.; Walton, A.
1980-01-01
Three installations utilizing separate dispersed storage and generation (DSG) technologies were investigated. Each of the systems is described in costs and control. Selected institutional and environmental issues are discussed, including life cycle costs. No unresolved technical, environmental, or institutional problems were encountered in the installations. The wind and solar photovoltaic DSG were installed for test purposes, and appear to be presently uneconomical. However, a number of factors are decreasing the cost of DSG relative to conventional alternatives, and an increased DSG penetration level may be expected in the future.
NASA Technical Reports Server (NTRS)
1978-01-01
The design and testing of the over the wing engine, a high bypass, geared turbofan engine, are discussed. The propulsion system performance is examined for uninstalled performance and installed performance. The fan aerodynamic performance and the D nozzle and reverser thrust performance are evaluated.
University Efforts on Non-PRASA Drinking Water Systems
In 2013 and 2014, the U.S. EPA and InterAmerican University of San German worked with water treatment operators from Patillas, Puerto Rico on the installation, training and testing of pretreatment/UV disinfection systems in the communities of La Sophia and Apeadero. Test water s...
Examining the Feasibility and Effect of Transitioning GED Tests to Computer
ERIC Educational Resources Information Center
Higgins, Jennifer; Patterson, Margaret Becker; Bozman, Martha; Katz, Michael
2010-01-01
This study examined the feasibility of administering GED Tests using a computer based testing system with embedded accessibility tools and the impact on test scores and test-taker experience when GED Tests are transitioned from paper to computer. Nineteen test centers across five states successfully installed the computer based testing program,…
Phase 2 Performance and Stability Tests of the YF-100A Airplane
1953-12-01
substantially reduced by the installation of the yaw damper on all F-100 aircraft. The production effectivity of this installation is F-1000, No. 164, with...longitudinal control system. The merits and effects of this modification have been discussed elsewhere in this report and in WADC comments on Phase IV tests...a position on the shroud effective ship F-lOOA No. 154 and subsequent. Par E, 2s - Refer to comment on Par E, 2b. Par E, 2u - Flight experience
2007-02-16
KENNEDY SPACE CENTER, FLA. -- Inside the Space Station Processing Facility at Kennedy Space Center, workers attach the Remote Manipulator System, or robotic arm, to a hoisting device to prepare for installation to the Japanese Experiment Module for testing. The RMS is one of the payloads scheduled to be delivered to the station on a future mission tentatively scheduled for 2008. The RMS is similar to the robotic arm already installed on the station's mobile base system. Photo credit: NASA/Amanda Diller
2007-02-19
KENNEDY SPACE CENTER, FLA. -- Inside the Space Station Processing Facility at Kennedy Space Center, workers use a hoisting device to move the Remote Manipulator System, or robotic arm, toward the Japanese Experiment Module for installation and testing. The RMS is one of the payloads scheduled to be delivered to the station on a future mission tentatively scheduled for 2008.The RMS is similar to the robotic arm already installed on the station's mobile base system. Photo credit: NASA/Amanda Diller
2007-02-16
KENNEDY SPACE CENTER, FLA. -- Inside the Space Station Processing Facility at Kennedy Space Center, workers attach the Remote Manipulator System, or robotic arm, to a hoisting device to prepare for installation to the Japanese Experiment Module for testing. The RMS is one of the payloads scheduled to be delivered to the station on a future mission tentatively scheduled for 2008. The RMS is similar to the robotic arm already installed on the station's mobile base system. Photo credit: NASA/Amanda Diller
2007-02-19
KENNEDY SPACE CENTER, FLA. -- Inside the Space Station Processing Facility at Kennedy Space Center, workers use a hoisting device to move the Remote Manipulator System, or robotic arm, toward the Japanese Experiment Module for installation and testing. The RMS is one of the payloads scheduled to be delivered to the station on a future mission tentatively scheduled for 2008.The RMS is similar to the robotic arm already installed on the station's mobile base system. Photo credit: NASA/Amanda Diller
2007-02-16
KENNEDY SPACE CENTER, FLA. -- Inside the Space Station Processing Facility at Kennedy Space Center, workers attach the Remote Manipulator System, or robotic arm, to a hoisting device to prepare for installation to the Japanese Experiment Module for testing. The RMS is one of the payloads scheduled to be delivered to the station on a future mission tentatively scheduled for 2008. The RMS is similar to the robotic arm already installed on the station's mobile base system. Photo credit: NASA/Amanda Diller
Initial SVS Integrated Technology Evaluation Flight Test Requirements and Hardware Architecture
NASA Technical Reports Server (NTRS)
Harrison, Stella V.; Kramer, Lynda J.; Bailey, Randall E.; Jones, Denise R.; Young, Steven D.; Harrah, Steven D.; Arthur, Jarvis J.; Parrish, Russell V.
2003-01-01
This document presents the flight test requirements for the Initial Synthetic Vision Systems Integrated Technology Evaluation flight Test to be flown aboard NASA Langley's ARIES aircraft and the final hardware architecture implemented to meet these requirements. Part I of this document contains the hardware, software, simulator, and flight operations requirements for this light test as they were defined in August 2002. The contents of this section are the actual requirements document that was signed for this flight test. Part II of this document contains information pertaining to the hardware architecture that was realized to meet these requirements as presented to and approved by a Critical Design Review Panel prior to installation on the B-757 Airborne Research Integrated Experiments Systems (ARIES) airplane. This information includes a description of the equipment, block diagrams of the architecture, layouts of the workstations, and pictures of the actual installations.
System for Anomaly and Failure Detection (SAFD) system development
NASA Technical Reports Server (NTRS)
Oreilly, D.
1992-01-01
This task specified developing the hardware and software necessary to implement the System for Anomaly and Failure Detection (SAFD) algorithm, developed under Technology Test Bed (TTB) Task 21, on the TTB engine stand. This effort involved building two units; one unit to be installed in the Block II Space Shuttle Main Engine (SSME) Hardware Simulation Lab (HSL) at Marshall Space Flight Center (MSFC), and one unit to be installed at the TTB engine stand. Rocketdyne personnel from the HSL performed the task. The SAFD algorithm was developed as an improvement over the current redline system used in the Space Shuttle Main Engine Controller (SSMEC). Simulation tests and execution against previous hot fire tests demonstrated that the SAFD algorithm can detect engine failure as much as tens of seconds before the redline system recognized the failure. Although the current algorithm only operates during steady state conditions (engine not throttling), work is underway to expand the algorithm to work during transient condition.
Accuracy improvement in a calibration test bench for accelerometers by a vision system
DOE Office of Scientific and Technical Information (OSTI.GOV)
D’Emilia, Giulio, E-mail: giulio.demilia@univaq.it; Di Gasbarro, David, E-mail: david.digasbarro@graduate.univaq.it; Gaspari, Antonella, E-mail: antonella.gaspari@graduate.univaq.it
2016-06-28
A procedure is described in this paper for the accuracy improvement of calibration of low-cost accelerometers in a prototype rotary test bench, driven by a brushless servo-motor and operating in a low frequency range of vibrations (0 to 5 Hz). Vibration measurements by a vision system based on a low frequency camera have been carried out, in order to reduce the uncertainty of the real acceleration evaluation at the installation point of the sensor to be calibrated. A preliminary test device has been realized and operated in order to evaluate the metrological performances of the vision system, showing a satisfactory behaviormore » if the uncertainty measurement is taken into account. A combination of suitable settings of the control parameters of the motion control system and of the information gained by the vision system allowed to fit the information about the reference acceleration at the installation point to the needs of the procedure for static and dynamic calibration of three-axis accelerometers.« less
40 CFR 60.2730 - What monitoring equipment must I install and what parameters must I monitor?
Code of Federal Regulations, 2012 CFR
2012-07-01
... detection system must be installed in each baghouse compartment or cell. For negative pressure or induced... scrubber, in place of hydrogen chloride testing with EPA Method 321 at 40 CFR part 63, appendix A, an owner... for monitoring hydrogen chloride emissions discharged to the atmosphere and record the output of the...
40 CFR 60.2165 - What monitoring equipment must I install and what parameters must I monitor?
Code of Federal Regulations, 2012 CFR
2012-07-01
... leak detection system must be installed in each baghouse compartment or cell. For negative pressure or... scrubber, in place of hydrogen chloride testing with EPA Method 321 at 40 CFR part 63, appendix A, an owner... for monitoring hydrogen chloride emissions discharged to the atmosphere and record the output of the...
46 CFR 169.703 - Cooking and heating.
Code of Federal Regulations, 2014 CFR
2014-10-01
... compressed natural gas (CNG) is authorized for cooking purposes only. (1) The design, installation and..., installation, and testing of each CNG system must meet either Chapter 6 of NFPA 302 or ABYC A-22. (3) The... additional requirements must also be met: (i) LPG or CNG must be odorized in accordance with ABYC A-1.5.d or...
46 CFR 169.703 - Cooking and heating.
Code of Federal Regulations, 2013 CFR
2013-10-01
... compressed natural gas (CNG) is authorized for cooking purposes only. (1) The design, installation and..., installation, and testing of each CNG system must meet either Chapter 6 of NFPA 302 or ABYC A-22. (3) The... additional requirements must also be met: (i) LPG or CNG must be odorized in accordance with ABYC A-1.5.d or...
46 CFR 169.703 - Cooking and heating.
Code of Federal Regulations, 2012 CFR
2012-10-01
... compressed natural gas (CNG) is authorized for cooking purposes only. (1) The design, installation and..., installation, and testing of each CNG system must meet either Chapter 6 of NFPA 302 or ABYC A-22. (3) The... additional requirements must also be met: (i) LPG or CNG must be odorized in accordance with ABYC A-1.5.d or...
NASA Technical Reports Server (NTRS)
Howard, D. F.
1976-01-01
The preliminary design and installation of high bypass, geared turbofan engine with a composite nacelle forming the propulsion system for a short haul passenger aircraft are described. The technology required for externally blown flap aircraft with under the wing (UTW) propulsion system installations for introduction into passenger service in the mid 1980's is included. The design, fabrication, and testing of this UTW experimental engine containing the required technology items for low noise, fuel economy, with composite structure for reduced weight and digital engine control are provided.
40 CFR 86.427-78 - Emission tests.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 19 2012-07-01 2012-07-01 false Emission tests. 86.427-78 Section 86... Later New Motorcycles, General Provisions § 86.427-78 Emission tests. (a)(1) Each test vehicle shall be driven with all emission control systems installed and operating for the following total test distances...
40 CFR 86.427-78 - Emission tests.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 19 2014-07-01 2014-07-01 false Emission tests. 86.427-78 Section 86... Later New Motorcycles, General Provisions § 86.427-78 Emission tests. (a)(1) Each test vehicle shall be driven with all emission control systems installed and operating for the following total test distances...
40 CFR 86.427-78 - Emission tests.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 19 2013-07-01 2013-07-01 false Emission tests. 86.427-78 Section 86... Later New Motorcycles, General Provisions § 86.427-78 Emission tests. (a)(1) Each test vehicle shall be driven with all emission control systems installed and operating for the following total test distances...
Photovoltaic Lifetime Project | Photovoltaic Research | NREL
PV & Solar Resource Testing Accelerated Testing & Analysis Systems Engineering Project Sandia National Laboratories' PV Performance Modeling Collaborative website. Jinko Solar. PV systems mounted on the ground. Jinko Solar PV Lifetime installation at NREL. need-alt Light-induced degradation
40 CFR 89.328 - Inlet and exhaust restrictions.
Code of Federal Regulations, 2010 CFR
2010-07-01
... at maximum air flow, as specified by the engine manufacturer for a clean air cleaner. A system representative of the installed engine may be used. In other cases a test shop system may be used. (2) The... cases a test shop system may be used. [59 FR 31335, June 17, 1994. Redesignated and amended at 63 FR...
40 CFR 89.328 - Inlet and exhaust restrictions.
Code of Federal Regulations, 2012 CFR
2012-07-01
... at maximum air flow, as specified by the engine manufacturer for a clean air cleaner. A system representative of the installed engine may be used. In other cases a test shop system may be used. (2) The... cases a test shop system may be used. [59 FR 31335, June 17, 1994. Redesignated and amended at 63 FR...
40 CFR 89.328 - Inlet and exhaust restrictions.
Code of Federal Regulations, 2011 CFR
2011-07-01
... at maximum air flow, as specified by the engine manufacturer for a clean air cleaner. A system representative of the installed engine may be used. In other cases a test shop system may be used. (2) The... cases a test shop system may be used. [59 FR 31335, June 17, 1994. Redesignated and amended at 63 FR...
40 CFR 89.328 - Inlet and exhaust restrictions.
Code of Federal Regulations, 2013 CFR
2013-07-01
... at maximum air flow, as specified by the engine manufacturer for a clean air cleaner. A system representative of the installed engine may be used. In other cases a test shop system may be used. (2) The... cases a test shop system may be used. [59 FR 31335, June 17, 1994. Redesignated and amended at 63 FR...
40 CFR 89.328 - Inlet and exhaust restrictions.
Code of Federal Regulations, 2014 CFR
2014-07-01
... at maximum air flow, as specified by the engine manufacturer for a clean air cleaner. A system representative of the installed engine may be used. In other cases a test shop system may be used. (2) The... cases a test shop system may be used. [59 FR 31335, June 17, 1994. Redesignated and amended at 63 FR...
SIMS prototype system 1 test results: Engineering analysis
NASA Technical Reports Server (NTRS)
1978-01-01
The space and domestic water solar heating system designated SIMS Prototype Systems 1 was evaluated. The test system used 720 ft (gross) of Solar Energy Products Air Collectors, a Solar Control Corporation SAM 20 Air Handler with Model 75-175 control unit, a Jackson Solar Storage tank with Rho Sigma Mod 106 controller, and 20 tons of rack storage. The test data analysis performed evaluates the system performance and documents the suitability of SIMS Prototype System 1 hardware for field installation.
CERN experience and strategy for the maintenance of cryogenic plants and distribution systems
NASA Astrophysics Data System (ADS)
Serio, L.; Bremer, J.; Claudet, S.; Delikaris, D.; Ferlin, G.; Pezzetti, M.; Pirotte, O.; Tavian, L.; Wagner, U.
2015-12-01
CERN operates and maintains the world largest cryogenic infrastructure ranging from ageing installations feeding detectors, test facilities and general services, to the state-of-the-art cryogenic system serving the flagship LHC machine complex. After several years of exploitation of a wide range of cryogenic installations and in particular following the last two years major shutdown to maintain and consolidate the LHC machine, we have analysed and reviewed the maintenance activities to implement an efficient and reliable exploitation of the installations. We report the results, statistics and lessons learned on the maintenance activities performed and in particular the required consolidations and major overhauling, the organization, management and methodologies implemented.
Venturi air-jet vacuum ejectors for high-volume atmospheric sampling on aircraft platforms
NASA Technical Reports Server (NTRS)
Hill, Gerald F.; Sachse, Glen W.; Young, Douglas C.; Wade, Larry O.; Burney, Lewis G.
1992-01-01
Documentation of the installation and use of venturi air-jet vacuum ejectors for high-volume atmospheric sampling on aircraft platforms is presented. Information on the types of venturis that are useful for meeting the pumping requirements of atmospheric-sampling experiments is also presented. A description of the configuration and installation of the venturi system vacuum line is included with details on the modifications that were made to adapt a venturi to the NASA Electra aircraft at GSFC, Wallops Flight Facility. Flight test results are given for several venturis with emphasis on applications to the Differential Absorption Carbon Monoxide Measurement (DACOM) system at LaRC. This is a source document for atmospheric scientists interested in using the venturi systems installed on the NASA Electra or adapting the technology to other aircraft.
Design Evolution and Verification of the A-3 Chemical Steam Generator
NASA Technical Reports Server (NTRS)
Kirchner, Casey K.
2009-01-01
Following is an overview of the Chemical Steam Generator system selected to provide vacuum conditions for a new altitude test facility, the A-3 Test Stand at Stennis Space Center (SSC) in Bay St. Louis, MS. A-3 will serve as NASA s primary facility for altitude testing of the J-2X rocket engine, to be used as the primary propulsion device for the upper stages of the Ares launch vehicles. The Chemical Steam Generators (CSGs) will produce vacuum conditions in the test cell through the production and subsequent supersonic ejection of steam into a diffuser downstream of the J-2X engine nozzle exit. The Chemical Steam Generators chosen have a rich heritage of operation at rocket engine altitude test facilities since the days of the Apollo program and are still in use at NASA White Sands Test Facility (WSTF) in New Mexico. The generators at WSTF have been modified to a degree, but are still very close to the heritage design. The intent for the A-3 implementation is to maintain this heritage design as much as possible, making minimal updates only where necessary to substitute for obsolete parts and to increase reliability. Reliability improvements are especially desired because the proposed system will require 27 generators, which is nine times the largest system installed in the 1960s. Improvements were suggested by the original design firm, Reaction Motors, by NASA SSC and NASA WSTF engineers, and by the A-3 test stand design contractor, Jacobs Technology, Inc. (JTI). This paper describes the range of improvements made to the design to date, starting with the heritage generator and the minor modifications made over time at WSTF, to the modernized configuration which will be used at A-3. The paper will discuss NASA s investment in modifications to SSC s E-2 test facility fire a full-scale Chemical Steam Generator in advance of the larger steam system installation at A-3. Risk mitigation testing will be performed in early 2009 at this test facility to verify that the CSGs operate as expected. The generator which will undergo this testing is of the most recent A-3 configuration, and will be instrumented far in excess of what is normally required for operation. The extra data will allow for easier troubleshooting and more complete knowledge of expected generator performance. In addition, the early testing will give SSC personnel experience in operating the CSG systems, which will expedite the process of installation and activation at A-3. Each Chemical Steam Generator is supported by a complement of valves, instruments, and flow control devices, with the entire assembly called a "module." The generators will be installed in groups of three, historically called "units". A module is so called because of its modular ability to be replaced or serviced without disturbing the other two modules installed on the same unit. A module is pictured in Figure 1, shown with its generator secured by white bands in its shipping (vs. installed) configuration. The heritage system at WSTF is composed of a single unit (three generator modules), pictured in Figure 2 as it was installed in 1965. In contrast, A-3 will have nine units operating in parallel to achieve vacuum conditions appropriate for testing the J-2X engine. Each of the combustors operates in two modes and achieves the so-called "full-steam" mode after all three of its stages ignite. Ignition of the first stage is achieved by exciting a spark plug; the second stage and main stage are lit by the flame front of the previous stage. The main stage burns approximately 97% of the total propellant flow and uses the heat energy to vaporize water into superheated steam. While the main stage remains unlit, the combustor is in so-called "idle" mode. In the WSTF system, this idle mode is not optimized for water usage, and does not need to be, as the water is pumped from a large reservoir. The water supply at A-3 will be contained in tanks with finite volume, so water optimization is preferred for the modnized configuration. Multiple solutions for this issue have been proposed, with the leading concept being a change to the operational definition of "idle mode," with the generator running in a lower heat flux condition.
76 FR 78730 - Petition for Waiver of Compliance
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-19
... locations throughout the BNSF operating system. BNSF also claims that: (1) The performance of \\3/4... Restraint Measurement System (GRMS) testing of the concrete crossties has confirmed that the installation of...
1964-06-19
XV-5A airplane installed in 40x80ft Subsonic Wind Tunnel at NASA Ames Research Center with Tom Mills. The propulsive lift system was tested to determine power-on performance characteristics in preparation for flight tests.
1964-06-19
XV-5A airplane installed in 40x80ft Subsonic Wind Tunnel at NASA Ames Research Center with Tom Mills. The propulsive lift system was tested to determine power-on performance characteristics in preparation for flight tests.
Cassini's RTGs undergo mechanical and electrical verification tests in the PHSF
NASA Technical Reports Server (NTRS)
1997-01-01
This radioisotope thermoelectric generator (RTG), at center, is ready for electrical verification testing now that it has been installed on the Cassini spacecraft in the Payload Hazardous Servicing Facility. A handling fixture, at far left, remains attached. This is the third and final RTG to be installed on Cassini for the prelaunch tests. The RTGs will provide electrical power to Cassini on its 6.7-year trip to the Saturnian system and during its four-year mission at Saturn. RTGs use heat from the natural decay of plutonium to generate electric power. The generators enable spacecraft to operate at great distances from the Sun where solar power systems are not feasible. The Cassini mission is targeted for an Oct. 6 launch aboard a Titan IVB/Centaur expendable launch vehicle.
NASA Technical Reports Server (NTRS)
Koenig, D. G.
1984-01-01
Factors influencing effective program planning for V/STOL wind-tunnel testing are discussed. The planning sequence itself, which includes a short checklist of considerations that could enhance the value of the tests, is also described. Each of the considerations, choice of wind tunnel, type of model installation, model development and test operations, is discussed, and examples of appropriate past and current V/STOL test programs are provided. A short survey of the moderate to large subsonic wind tunnels is followed by a review of several model installations, from two-dimensional to large-scale models of complete aircraft configurations. Model sizing, power simulation, and planning are treated, including three areas is test operations: data-acquisition systems, acoustic measurements in wind tunnels, and flow surveying.
Design, Fabrication, and Shakeout Testing of ATALANTE Dissolver Off-Gas Sorbent-Based Capture System
DOE Office of Scientific and Technical Information (OSTI.GOV)
Walker, Jr, Joseph Franklin; Jubin, Robert Thomas; Jordan, Jacob A.
A sorbent-based capture system designed for integration into the existing dissolver off-gas (DOG) treatment system at the ATelier Alpha et Laboratoires pour ANalyses, Transuraniens et Etudes de retraitement (ATALANTE) facility has been successfully designed and fabricated and has undergone shakeout testing. Discussions with personnel from the ATALANTE facility provided guidance that was used for the design. All components for this system were specified, procured, and received on site at Oak Ridge National Laboratory (ORNL). The system was then fabricated and tested at ORNL to verify operation. Shakeout testing resulted in a simplified system. This system should be easily installed intomore » the existing facility and should be straightforward to operate during future experimental testing. All parts were selected to be compatible with ATALANTE power supplies, space requirements, and the existing DOG treatment system. Additionally, the system was demonstrated to meet all of four design requirements. These include (1) a dissolver off-gas flow rate of ≤100 L/h (1.67 L/min), (2) an external temperature of ≤50°C for all system components placed in the hot cell, (3) a sorbent bed temperature of ~150°C, and (4) a gas temperature of ~150°C upon entry into the sorbent bed. The system will be ready for shipment and installation in the existing DOG treatment system at ATALANTE in FY 2016.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bartlett, Roscoe A.; Baird, Mark L.; Berrill, Mark A.
This guide describes the structure and setup of the standard VERA development environment (VERA Dev Env) and standard VERA Third Party Libraries (TPLs) that need to be in place before installing many of the VERA simulation components. It describes everything from the initial setup on a new machine to the final build, testing, and installation of VERA components. The goal of this document is to describe how to create the directories and contents outlined in Standard VERA Dev Env Directory Structure and then obtain the remaining VERA source and build, test, and install any of the necessary VERA components onmore » a given system. This document describes the process both for a development version of VERA and for a released tarball of the VERA sources.« less
Solar heating and cooling system design and development
NASA Technical Reports Server (NTRS)
1978-01-01
The progress of the program during the sixth program quarter is reported. The program calls for the development and delivery of eight prototype solar heating and cooling systems for installation and operational test. The William O'Brien single-family heating system was installed and is operational. The New Castle single-family heating residence is under construction. The Kansas University (KU) system is in the final design stages. The 25 ton cooling subsystem for KU is the debugging stage. Pressure drops that were greater than anticipated were encountered. The 3 ton simulation work is being finalized and the design parameters for the Rankine system were determined from simulation output.
2013-11-07
CAPE CANAVERAL, Fla. – At NASA’s Kennedy Space Center in Florida, technicians monitor the progress as the fourth ogive panel is lifted by crane so that they can be installed on the Orion ground test vehicle in Vehicle Assembly Building high bay 4. Three of the panels have already been installed on the test vehicle. The ogive panels enclose and protect the Orion spacecraft and attach to the Launch Abort System. The test vehicle is being used by the Ground Systems Development and Operations Program for path finding operations, including simulated manufacturing, assembly and stacking procedures. Orion is the exploration spacecraft designed to carry astronauts to destinations not yet explored by humans, including an asteroid and Mars. It will have emergency abort capability, sustain the crew during space travel and provide safe re-entry from deep space return velocities. The first unpiloted test flight of Orion is scheduled to launch in 2014 atop a Delta IV rocket and in 2017 on NASA’s Space Launch System rocket. For more information, visit www.nasa.gov/orion. Photo credit: Kim Shiflett
2013-11-07
CAPE CANAVERAL, Fla. – At NASA’s Kennedy Space Center in Florida, technicians monitor the progress as the fourth ogive panel is lifted by crane so that they can be installed on the Orion ground test vehicle in Vehicle Assembly Building high bay 4. Three of the panels have already been installed on the test vehicle. The ogive panels enclose and protect the Orion spacecraft and attach to the Launch Abort System. The test vehicle is being used by the Ground Systems Development and Operations Program for path finding operations, including simulated manufacturing, assembly and stacking procedures. Orion is the exploration spacecraft designed to carry astronauts to destinations not yet explored by humans, including an asteroid and Mars. It will have emergency abort capability, sustain the crew during space travel and provide safe re-entry from deep space return velocities. The first unpiloted test flight of Orion is scheduled to launch in 2014 atop a Delta IV rocket and in 2017 on NASA’s Space Launch System rocket. For more information, visit www.nasa.gov/orion. Photo credit: Kim Shiflett
2013-11-07
CAPE CANAVERAL, Fla. – At NASA’s Kennedy Space Center in Florida, technicians monitor the progress as the fourth ogive panel is lifted by crane so that they can be installed on the Orion ground test vehicle in Vehicle Assembly Building high bay 4. Three of the panels have already been installed on the test vehicle. The ogive panels enclose and protect the Orion spacecraft and attach to the Launch Abort System. The test vehicle is being used by the Ground Systems Development and Operations Program for path finding operations, including simulated manufacturing, assembly and stacking procedures. Orion is the exploration spacecraft designed to carry astronauts to destinations not yet explored by humans, including an asteroid and Mars. It will have emergency abort capability, sustain the crew during space travel and provide safe re-entry from deep space return velocities. The first unpiloted test flight of Orion is scheduled to launch in 2014 atop a Delta IV rocket and in 2017 on NASA’s Space Launch System rocket. For more information, visit www.nasa.gov/orion. Photo credit: Kim Shiflett
Prototype solar heating and cooling systems
NASA Technical Reports Server (NTRS)
1978-01-01
A collection of monthly status reports on the development of eight prototype solar heating and cooling systems is presented. The effort calls for the development, manufacture, test, system installation, maintenance, problem resolution, and performance evaluation. The systems are 3, 25, and 75 ton size units.
Prototype solar heating and cooling systems
NASA Technical Reports Server (NTRS)
1978-01-01
A collection of monthly status reports are given on the development of eight prototype solar heating and cooling systems. This effort calls for the development, manufacturing, test, system installation, maintenance, problem resolution, and performance evaluation. The systems are 3-, 25-, and 75-ton size units.
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
The objectives of the SNAP 7A program were to design, manufacture, test, and deliver a five-watt electric generation system for a U. S. Coast Guard 8 x 26E light buoy. The 10-watt Sr/sup 90/ thermoelectric generator, the d-c-to-d-c converter, batteries and the method of installation in the light buoy are describcd. The SNAP 7A generator was fueled with four capsules containing a total of 40,800 curies of Sr/sup 90/ titanate. After fueling and testing, the SNAP 7A electric generating system was installed in the Coast Guard light buoy at Baltimore, Maryland, on December 15, 1961. Operation of the buoy lampmore » is continuous. (auth)« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Alfred, J.W.; Shinn, J.M. Jr; Kirby, C.E.
1976-07-01
This report describes a low-cost solar home heating system to supplement the home-owner's present warm-air heating system. It has three parts: (1) A brief background on solar heating, (2) Langley's experience with a demonstration system, and (3) information for the home-owner who wishes to construct such a system. Instructions are given for a solar heating installation in which he supplies all labor needed to install off-the-shelf components estimated to cost $2000. These components, which include solar collector, heat exchanger, water pump, storage tank, piping, and controls to make the system completely automatic, are readily available at local lumber yards, hardwaremore » stores, and plumbing supply stores, and they are relatively simple to install. Manufacturers and prices of each component used and a rough cost analysis based on these prices are given for the owner's convenience. This report also gives performance data obtained from a demonstration system which has been built and tested at the Langley Research Center.« less
An electronic scanner of pressure for wind tunnel models
NASA Technical Reports Server (NTRS)
Kauffman, Ronald C.; Coe, Charles F.
1986-01-01
An electronic scanner of pressure (ESOP) has been developed by NASA Ames Research Center for installation in wind tunnel models. An ESOP system consists of up to 20 pressure modules (PMs), each with 48 pressure transducers and a heater, an analog-to-digital (A/D) converter module, a microprocessor, a data controller, a monitor unit, a control and processing unit, and a heater controller. The PMs and the A/D converter module are sized to be installed in the models tested in the Ames Aerodynamics Division wind tunnels. A unique feature of the pressure module is the lack of moving parts such as a pneumatic switch used in other systems for in situ calibrations. This paper describes the ESOP system and the results of the initial testing of the system. The initial results indicate the system meets the original design goal of 0.15 percent accuracy.
Pi of the Sky full system and the new telescope
NASA Astrophysics Data System (ADS)
Mankiewicz, L.; Batsch, T.; Castro-Tirado, A.; Czyrkowski, H.; Cwiek, A.; Cwiok, M.; Dabrowski, R.; Jelínek, M.; Kasprowicz, G.; Majcher, A.; Majczyna, A.; Malek, K.; Nawrocki, K.; Obara, L.; Opiela, R.; Piotrowski, L. W.; Siudek, M.; Sokolowski, M.; Wawrzaszek, R.; Wrochna, G.; Zaremba, M.; Żarnecki, A. F.
2014-12-01
The Pi of the Sky is a system of wide field of view robotic telescopes, which search for short timescale astrophysical phenomena, especially for prompt optical GRB emission. The system was designed for autonomous operation, monitoring a large fraction of the sky to a depth of 12(m}-13({m)) and with time resolution of the order of 1 - 10 seconds. The system design and observation strategy were successfully tested with a prototype detector operational at Las Campanas Observatory, Chile from 2004-2009 and moved to San Pedro de Atacama Observatory in March 2011. In October 2010 the first unit of the final Pi of the Sky detector system, with 4 CCD cameras, was successfully installed at the INTA El Arenosillo Test Centre in Spain. In July 2013 three more units (12 CCD cameras) were commissioned and installed, together with the first one, on a new platform in INTA, extending sky coverage to about 6000 square degrees.
A metrology system for a high resolution cavity beam position monitor system
NASA Astrophysics Data System (ADS)
Walston, Sean; Boogert, Stewart; Chung, Carl; Fitsos, Pete; Frisch, Joe; Gronberg, Jeff; Hayano, Hitoshi; Hinton, Shantell; Honda, Yosuke; Khainovski, Oleg; Kolomensky, Yury; Loscutoff, Peter; Lyapin, Alexey; Malton, Stephen; May, Justin; McCormick, Douglas; Meller, Robert; Miller, David; Orimoto, Toyoko; Ross, Marc; Slater, Mark; Smith, Steve; Smith, Tonee; Terunuma, Nobuhiro; Thomson, Mark; Urakawa, Junji; Vogel, Vladimir; Ward, David; White, Glen
2013-11-01
International Linear Collider (ILC) interaction region beam sizes and component position stability requirements will likely be as small as a few nanometers. It is important to the ILC design effort to demonstrate that these tolerances can be achieved-ideally using a beam-based stability measurement. We developed a high resolution RF cavity Beam Position Monitor (BPM) system. A triplet of these BPMs, installed in the extraction line of the KEK Accelerator Test Facility (ATF) and tested with its ultra-low emittance beam, achieved a position measurement resolution of 15 nm. A metrology system for the three BPMs was subsequently installed. This system employed optical encoders to measure each BPM's position and orientation relative to a zero-coefficient of thermal expansion carbon fiber frame. We have demonstrated that the three BPMs behave as a rigid-body at the level of less than 5 nm.
Code of Federal Regulations, 2010 CFR
2010-10-01
... components thereof shall be tested as required by this section. (b) Accumulators constructed as pressure... associated equipment components, including hydraulic steering gear, in lieu of being tested at the time of installation, may be shop tested by the manufacturer to 11/2 times the maximum allowable pressure of the system...
Code of Federal Regulations, 2012 CFR
2012-10-01
... components thereof shall be tested as required by this section. (b) Accumulators constructed as pressure... associated equipment components, including hydraulic steering gear, in lieu of being tested at the time of installation, may be shop tested by the manufacturer to 11/2 times the maximum allowable pressure of the system...
Code of Federal Regulations, 2011 CFR
2011-10-01
... components thereof shall be tested as required by this section. (b) Accumulators constructed as pressure... associated equipment components, including hydraulic steering gear, in lieu of being tested at the time of installation, may be shop tested by the manufacturer to 11/2 times the maximum allowable pressure of the system...
Code of Federal Regulations, 2014 CFR
2014-10-01
... components thereof shall be tested as required by this section. (b) Accumulators constructed as pressure... associated equipment components, including hydraulic steering gear, in lieu of being tested at the time of installation, may be shop tested by the manufacturer to 11/2 times the maximum allowable pressure of the system...
Code of Federal Regulations, 2013 CFR
2013-10-01
... components thereof shall be tested as required by this section. (b) Accumulators constructed as pressure... associated equipment components, including hydraulic steering gear, in lieu of being tested at the time of installation, may be shop tested by the manufacturer to 11/2 times the maximum allowable pressure of the system...
Operational test report -- Project W-320 cathodic protection systems
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bowman, T.J.
1998-06-16
Washington Administrative Code (WAC) 173-303-640 specifies that corrosion protection must be designed into tank systems that treat or store dangerous wastes. Project W-320, Waste Retrieval Sluicing System (WRSS), utilizes underground encased waste transfer piping between tanks 241-C-106 and 241-AY-102. Corrosion protection is afforded to the encasements of the WRSS waste transfer piping through the application of earthen ionic currents onto the surface of the piping encasements. Cathodic protection is used in conjunction with the protective coatings that are applied upon the WRSS encasement piping. WRSS installed two new two rectifier systems (46 and 47) and modified one rectifier system (31).more » WAC 173-303-640 specifies that the proper operation of cathodic protection systems must be confirmed within six months after initial installation. The WRSS cathodic protection systems were energized to begin continuous operation on 5/5/98. Sixteen days after the initial steady-state start-up of the WRSS rectifier systems, the operational testing was accomplished with procedure OTP-320-006 Rev/Mod A-0. This operational test report documents the OTP-320-006 results and documents the results of configuration testing of integrated piping and rectifier systems associated with the W-320 cathodic protection systems.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ginn, J.W.
1995-11-01
The photovoltaic systems test facility at Sandia National Laboratories is evaluating the performance of large hybrid power-processing centers (PPC`s). The primary customer for this work has been the Strategic Environmental Research and Development Program (SERDP) of the Department of Defense. One of the goals of SERDP is to develop power-processing hardware to be used in photovoltaic-hybrid power systems at remote military installations. Power for these installations is presently provided by engine-generators. Currently, hardware for twelve such sites is in various stages of procurement. The subject of this talk is testing of the PPC for the first SERDP system, a 300-kWmore » unit for Superior Valley, a US Navy site at China Lake, California.« less
NASA Astrophysics Data System (ADS)
Cawley, Peter
2014-03-01
There is a gradual shift in emphasis from periodic inspection with detachable transducers (NDT) to permanently installed monitoring systems giving information about the structural integrity at pre-programmed intervals or on demand (SHM). The drivers of this change are discussed, together with the requirements of successful SHM systems. Particular issues are that NDT often involves scanning and this is not possible with typical SHM configurations; it therefore becomes important to cover a significant area of structure from each transducer position. Guided waves provide a possible solution to this problem and permanently installed guided wave pipe inspection systems are now available. The sensitivity obtained with a permanently installed system is significantly better than that in a one-off test as baseline subtraction can be employed. However, this is far from trivial as it is necessary to compensate for benign changes such as temperature. The guided wave technique does not provide accurate remaining thickness information and is best complemented by point measurements at selected locations. Another issue is that the SHM transducers must survive in operational conditions, which is particularly difficult at high temperatures. Recent work at Imperial College and associated spin-out companies on solutions to these problems is discussed.
Learning to build large structures in space
NASA Technical Reports Server (NTRS)
Hagler, T.; Patterson, H. G.; Nathan, C. A.
1977-01-01
The paper examines some of the key technologies and forms of construction know-how that will have to be developed and tested for eventual application to building large structures in space. Construction of a shuttle-tended space construction/demonstration platform would comprehensively demonstrate large structure technology, develop construction capability, and furnish a construction platform for a variety of operational large structures. Completion of this platform would lead to demonstrations of the Satellite Power System (SPS) concept, including microwave transmission, fabrication of 20-m-deep beams, conductor installation, rotary joint installation, and solar blanket installation.
Qualification of the Tropical Rainfall Measuring Mission Solar Array Deployment System
NASA Technical Reports Server (NTRS)
Lawrence, Jon
1998-01-01
The Tropical Rainfall Measuring Mission (TRMM) solar arrays are placed into orbital configuration by a complex deployment system. Its two wings each comprise twin seven square solar panels located by a twelve foot articulated boom. The four spring-driven hinge lines per wing are rate-limited by viscous dampers. The wings are stowed against the spacecraft kinematically, and released by five pyrotechnically-actuated mechanisms. Since deployment failure would be catastrophic, a total of 17 deployment tests were completed to qualify the system for the worst cast launch environment. This successful testing culminated in the flawless deployment of the solar arrays on orbit, 15 minutes after launch in November 1997. The custom gravity negation system used to perform deployment testing is modular to allow its setup in several locations, including the launch site in Japan. Both platform and height can be varied, to meet the requirements of the test configuration and the test facility. Its air pad floatation system meets tight packaging requirements, allowing installation while stowed against the spacecraft without breaking any flight interfaces, and avoiding interference during motion. This system was designed concurrently with the deployment system, to facilitate its installation, to aid in the integration of the flight system to the spacecraft, while demonstrating deployment capabilities. Critical parameters for successful testing were alignment of deployment axes and tables to gravity, alignment of table seams to minimize discontinuities, and minimizing pressure drops in the air supply system. Orbital performance was similar to that predicted by ground testing.
Techniques for Embedding Instrumentation in Pressure Vessel Test Articles
NASA Technical Reports Server (NTRS)
Cornelius, Michael
2006-01-01
Many interesting structural and thermal events occur in materials that are housed within a surrounding pressure vessel. In order to measure the environment during these events and explore their causes instrumentation must be installed on or in the material. Transducers can be selected that are small enough to be embedded within the test material but these instruments must interface with an external system in order to apply excitation voltages and output the desired data. The methods for installing the instrumentation and creating an interface are complicated when the material is located in a case or housing containing high pressures and hot gases. Installation techniques for overcoming some of these difficulties were developed while testing a series of small-scale solid propellant and hybrid rocket motors at Marshall Space Flight Center. These techniques have potential applications in other test articles where data are acquired from materials that require containment due to the severe environment encountered during the test process. This severe environment could include high pressure, hot gases, or ionized atmospheres. The development of these techniques, problems encountered, and the lessons learned from the ongoing testing process are summarized.
Testing Installed Propulsion For Shielded Exhaust Configurations
NASA Technical Reports Server (NTRS)
Bridges, James; Podboy, Gary G.; Brown, Clifford A.
2016-01-01
Jet-surface interaction (JSI) can be a significant factor in the exhaust noise of installed propulsion. Tests to further understanding and prediction of the acoustic impacts of JSI have been described. While there were many objectives for the NASA JSI1044 test, the overall objective was to prepare for a 2016 test validating the design of a low-noise, low-boom supersonic commercial airliner. In this paper we explore design requirements for a partial aircraft model to be used in subscale acoustic testing, especially focusing on the amount of shielding surface that must be provided to simulate the acoustic environment between propulsion exhaust system and observer. We document the dual-stream jets, both nozzle and flow conditions, which were tested to extend JSI acoustic modeling from simple single-stream jets to realistic dual-stream exhaust nozzles. Examples of observations found as surface geometry and flow conditions were varied were provided. And we have presented initial measurements of the installation impacts of integrating the propulsion on the airframe for a supersonic airliner with realistic airframe geometries and nozzles.
46 CFR 162.161-6 - Tests for approval.
Code of Federal Regulations, 2012 CFR
2012-10-01
... have been conditioned for 24 hours at 32 °F or at the expected service temperature, if lower than 32 °F... distribution of the extinguishing agent; (3) Salt spray corrosion resistance for marine-type systems; (4) Vibration resistance of installed components for marine-type systems; and (5) Any additional tests contained...
46 CFR 162.161-6 - Tests for approval.
Code of Federal Regulations, 2014 CFR
2014-10-01
... have been conditioned for 24 hours at 32 °F or at the expected service temperature, if lower than 32 °F... distribution of the extinguishing agent; (3) Salt spray corrosion resistance for marine-type systems; (4) Vibration resistance of installed components for marine-type systems; and (5) Any additional tests contained...
46 CFR 162.161-6 - Tests for approval.
Code of Federal Regulations, 2013 CFR
2013-10-01
... have been conditioned for 24 hours at 32 °F or at the expected service temperature, if lower than 32 °F... distribution of the extinguishing agent; (3) Salt spray corrosion resistance for marine-type systems; (4) Vibration resistance of installed components for marine-type systems; and (5) Any additional tests contained...
30 CFR 250.447 - When must I pressure test the BOP system?
Code of Federal Regulations, 2013 CFR
2013-07-01
... THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Blowout Preventer (bop) System Requirements § 250.447 When must I pressure test the BOP... BOP, and drill-string safety valve): (a) When installed; (b) Before 14 days have elapsed since your...
30 CFR 250.447 - When must I pressure test the BOP system?
Code of Federal Regulations, 2012 CFR
2012-07-01
... THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Blowout Preventer (bop) System Requirements § 250.447 When must I pressure test the BOP... BOP, and drill-string safety valve): (a) When installed; (b) Before 14 days have elapsed since your...
30 CFR 250.447 - When must I pressure test the BOP system?
Code of Federal Regulations, 2014 CFR
2014-07-01
... THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Blowout Preventer (bop) System Requirements § 250.447 When must I pressure test the BOP... BOP, and drill-string safety valve): (a) When installed; (b) Before 14 days have elapsed since your...
NASA Technical Reports Server (NTRS)
Balboni, John A.; Gokcen, Tahir; Hui, Frank C. L.; Graube, Peter; Morrissey, Patricia; Lewis, Ronald
2015-01-01
The paper describes the consolidation of NASA's high powered arc-jet testing at a single location. The existing plasma arc-jet wind tunnels located at the Johnson Space Center were relocated to Ames Research Center while maintaining NASA's technical capability to ground-test thermal protection system materials under simulated atmospheric entry convective heating. The testing conditions at JSC were reproduced and successfully demonstrated at ARC through close collaboration between the two centers. New equipment was installed at Ames to provide test gases of pure nitrogen mixed with pure oxygen, and for future nitrogen-carbon dioxide mixtures. A new control system was custom designed, installed and tested. Tests demonstrated the capability of the 10 MW constricted-segmented arc heater at Ames meets the requirements of the major customer, NASA's Orion program. Solutions from an advanced computational fluid dynamics code were used to aid in characterizing the properties of the plasma stream and the surface environment on the calorimeters in the supersonic flow stream produced by the arc heater.
The Recreational Pilot Practical Test Standard for Powered Parachute
DOT National Transportation Integrated Search
1997-06-01
The I-4 Surveillance and Motorist Information System (SMIS) in the Orlando metropolitan area is Florida's largest existing Freeway Management System (FMS). This system was initially installed in 1991 (Phase I) to help support the TravTek ITS Operatio...
The development of the Garden Banks block 388 FPF mooring system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dove, P.G.S.; Librino, F.; Scovell, D.C.
1995-12-01
This paper discusses work conducted during the design, procurement and installation of Enserch Exploration, Inc.`s Garden Banks 388 FPF mooring system. The design began with the execution of a trade-off study evaluating and comparing previously installed floating production moorings in the Gulf of Mexico, coupled with evaluation of new concepts and emphasis on cost effective solutions. The design effort involved dynamic analysis and wind tunnel and model tank testing, all in accordance with the newly completed API document RP 2FP1. Inspection of various components from the Placid GC-29 FPS moorings (installed in 1987 and recovered in 1990) determined that sectionsmore » of chain, jacketed spiral strand wire rope, submersible buoys and connectors could be reused with suitable refurbishment. The excellent condition of the rig`s onboard winching system also resulted in the reuse of the windlasses, with specified upgrades. Because a sufficient amount of used wire was not available, a bare spiral strand wire rope construction was adopted, including zinc anodes in the new sections, rather than jacketed strand. The lack of cost effective installation vessels in the Gulf of Mexico at the time of the installation bid posed challenges to Enserch. However, an innovative preset mooring installation scheme involving Heeremac`s SSCV Balder on its own moorings was adopted. Since the vessel was already in the Gulf of Mexico on contract for other projects, a cost effective contract was negotiated. The results of this effort led to considerable cost savings for Enserch, compared to conventional FPF mooring systems previously installed in the Gulf of Mexico.« less
Langley 16- Ft. Transonic Tunnel Pressure Sensitive Paint System
NASA Technical Reports Server (NTRS)
Sprinkle, Danny R.; Obara, Clifford J.; Amer, Tahani R.; Leighty, Bradley D.; Carmine, Michael T.; Sealey, Bradley S.; Burkett, Cecil G.
2001-01-01
This report describes the NASA Langley 16-Ft. Transonic Tunnel Pressure Sensitive Paint (PSP) System and presents results of a test conducted June 22-23, 2000 in the tunnel to validate the PSP system. The PSP system provides global surface pressure measurements on wind tunnel models. The system was developed and installed by PSP Team personnel of the Instrumentation Systems Development Branch and the Advanced Measurement and Diagnostics Branch. A discussion of the results of the validation test follows a description of the system and a description of the test.
32 CFR Appendix B to Part 286 - Addressing FOIA Requests
Code of Federal Regulations, 2010 CFR
2010-07-01
... (International & Commercial Programs) Deputy Under Secretary of Defense (Industrial Affairs & Installations... Research & Engineering Director, Small & Disadvantaged Business Utilization Director, Defense Procurement Director, Test Systems Engineering & Evaluation Director, Strategic & Tactical Systems DoD Radiation...
First experience with carbon stripping foils for the 160 MeV H- injection into the CERN PSB
NASA Astrophysics Data System (ADS)
Weterings, Wim; Bracco, Chiara; Jorat, Louise; Noulibos, Remy; van Trappen, Pieter
2018-05-01
160 MeV H- beam will be delivered from the new CERN linear accelerator (Linac4) to the Proton Synchrotron Booster (PSB), using a H- charge-exchange injection system. A 200 µg/cm2 carbon stripping foil will convert H- into protons by stripping off the electrons. The H- charge-exchange injection principle will be used for the first time in the CERN accelerator complex and involves many challenges. In order to gain experience with the foil changing mechanism and the very fragile foils, in 2016, prior to the installation in the PSB, a stripping foil test stand has been installed in the Linac4 transfer line. In addition, parts of the future PSB injection equipment are also temporarily installed in the Linac4 transfer line for tests with a 160 MeV H- commissioning proton beam. This paper describes the foil changing mechanism and control system, summarizes the practical experience of gluing and handling these foils and reports on the first results with beam.
33 CFR 150.515 - What are the requirements for weight testing of newly installed or relocated craft?
Code of Federal Regulations, 2010 CFR
2010-07-01
... weight testing of newly installed or relocated craft? 150.515 Section 150.515 Navigation and Navigable... testing of newly installed or relocated craft? (a) The operator must perform installation weight testing... (a) of this section, when survival crafts are relocated to another deepwater port. ...
Kostyukevich, Yury; Efremov, Denis; Ionov, Vladimir; Kukaev, Eugene; Nikolaev, Eugene
2017-11-01
The detection of explosives and drugs in hard-to-reach places is a considerable challenge. We report the development and initial experimental characterization of the air analysis system that includes Field Asymmetric Ion Mobility Spectrometer, array of the semiconductor gas sensors and is installed on multicopter. The system was developed based on the commercially available DJI Matrix 100 platform. For data collection and communication with operator, the special compact computer (Intel Compute Stick) was installed onboard. The total weight of the system was 3.3 kg. The system allows the 15-minute flight and provides the remote access to the obtained data. The developed system can be effectively used for the detection of impurities in the air, ecology monitoring, detection of chemical warfare agents, and explosives, what is especially important in light of recent terroristic attacks. The capabilities of the system were tested on the several explosives such as trinitrotoluene and nitro powder. Copyright © 2017 John Wiley & Sons, Ltd.
2009-10-23
CAPE CANAVERAL, Fla. – This aerial view of the Launch Control Center at NASA's Kennedy Space Center in Florida shows the installation of new windows nearing completion. New, hurricane-rated window systems for the four Firing Rooms and the vestibule areas between Firing Rooms 1 and 2 and Firing Rooms 3 and 4 are being installed. In order to avoid operational impacts the new windows are being installed on the outside of the existing windows, enclosing the space formerly occupied by the louvers. The old windows will remain in place until the new windows are completely installed and leak tested. This approach will continue to keep the firing rooms from being exposed to the elements. Photo credit: NASA/Kim Shiflett
NASA Technical Reports Server (NTRS)
1973-01-01
The manufacturing tasks for the program included the fabrication and assembly of an epoxy fiberglass purge bag to encapsulate an insulated cryogenic propellant tank. Purge, repressurization and venting hardware were procured and installed on the purge bag assembly in preparation for performance testing. The fabrication and installation of the superfloc multilayer insulation (MLI) on the cryogenic tank was accomplished as part of a continuing program. An abstraction of the results of the MLI fabrication task is included to describe the complete fabrication requirements for a reusable cryogenic propellant space storage system.
Acceptance test procedure for the L-070 project mechanical equipment and instrumentation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Loll, C.M.
1996-04-19
This document contains the acceptance test procedure for the mechanical equipment and instrumentation installed per the L-070 Project. The specific system to be tested are the pump controls for the 3906 Lift Station and 350-A Lift Station. In addition, verification that signals are being received by the 300 Area Treated Effluent Disposal Facility control system, is also performed.
SMART operational field test evaluation : dispatchers survey report : final report
DOT National Transportation Integrated Search
1997-06-01
The Suburban Mobility Authority for Regional Transportation (SMART) has installed an automaticscheduling and dispatch system (ASD) in Southeast Michigan in accordance with their plans toimplement ITS as a site for an operational field test. The purpo...
Flat-plate collector research area: Silicon material task
NASA Technical Reports Server (NTRS)
Lutwack, R.
1982-01-01
Silane decomposition in a fluidized-bed reactor (FBR) process development unit (PDU) to make semiconductor-grade Si is reviewed. The PDU was modified by installation of a new heating system to provide the required temperature profile and better control, and testing was resumed. A process for making trichlorosilane by the hydrochlorination of metallurgical-grade Si and silicon tetrachloride is reported. Fabrication and installation of the test system employing a new 2-in.-dia reactor was completed. A process that converts trichlorosilane to dichlorosilane (DCS), which is reduced by hydrogen to make Si by a chemical vapor deposition step in a Siemens-type reactor is described. Testing of the DCS PDU integraled with Si deposition reactors continued. Experiments in a 2-in.-dia reactor to define the operating window and to investigate the Si deposition kinetics were completed.
Demonstration of subsidence monitoring system
NASA Astrophysics Data System (ADS)
Conroy, P. J.; Gyarmaty, J. H.; Pearson, M. L.
1981-06-01
Data on coal mine subsidence were studied as a basis for the development of subsidence control technology. Installation, monitoring, and evaluation of three subsidence monitoring instrument systems were examined: structure performance, performance of supported systems, and performance of caving systems. Objectives of the instrument program were: (1) to select, test, assemble, install, monitor, and maintain all instrumentation required for implementing the three subsidence monitoring systems; and (2) to evaluate performance of each instrument individually and as part of the appropriate monitoring system or systems. The use of an automatic level and a rod extensometer for measuring structure performance, and the automatic level, steel tape extensometer, FPBX, FPBI, USBM borehole deformation gauge, and vibrating wire stressmeters for measuring the performance of caving systems are recommended.
Safety performance evaluation of the non-blocked Midwest Guardrail System (MGS).
DOT National Transportation Integrated Search
2013-01-01
The roadway width required to install a guardrail system with a 12-in. (305-mm) blockout is not always available. In : response, proprietary non-blocked W-beam guardrail systems were developed and successfully crash tested. However, the : use of prop...
47 CFR 27.1164 - The cost-sharing formula.
Code of Federal Regulations, 2014 CFR
2014-10-01
... systems; Heating Ventilation and Air Conditioning (HVAC) (if required); alternate transport equipment; and.../path survey); installation; systems testing; FCC filing costs; site acquisition and civil works; zoning... defined as the actual costs associated with providing a replacement system, such as equipment and...
Code of Federal Regulations, 2014 CFR
2014-10-01
... system means the hardware, operational software, applications software and electronic linkages in an... further defined in the OCSE guideline entitled “Automated Systems for Child Support Enforcement: A Guide... training, testing, and conversion plans to install the computer system. (j) The following terms are defined...
Code of Federal Regulations, 2011 CFR
2011-10-01
... system means the hardware, operational software, applications software and electronic linkages in an... further defined in the OCSE guideline entitled “Automated Systems for Child Support Enforcement: A Guide... training, testing, and conversion plans to install the computer system. (j) The following terms are defined...
Code of Federal Regulations, 2012 CFR
2012-10-01
... system means the hardware, operational software, applications software and electronic linkages in an... further defined in the OCSE guideline entitled “Automated Systems for Child Support Enforcement: A Guide... training, testing, and conversion plans to install the computer system. (j) The following terms are defined...
Code of Federal Regulations, 2013 CFR
2013-10-01
... system means the hardware, operational software, applications software and electronic linkages in an... further defined in the OCSE guideline entitled “Automated Systems for Child Support Enforcement: A Guide... training, testing, and conversion plans to install the computer system. (j) The following terms are defined...
Code of Federal Regulations, 2010 CFR
2010-10-01
... system means the hardware, operational software, applications software and electronic linkages in an... further defined in the OCSE guideline entitled “Automated Systems for Child Support Enforcement: A Guide... training, testing, and conversion plans to install the computer system. (j) The following terms are defined...
Procedures on installing, acceptance testing, operating, maintaining and quality assuring three types of ground-based, upper air meteorological measurement systems are described. he limitations and uncertainties in precision and accuracy measurements associated with these systems...
47 CFR 15.31 - Measurement standards.
Code of Federal Regulations, 2010 CFR
2010-10-01
... the installation site, such as perimeter protection systems, carrier current systems, and systems... variation of the input power or the radiated signal level of the fundamental frequency component of the... nominal rated supply voltage. For battery operated equipment, the equipment tests shall be performed using...
Intelligent Data Reduction (IDARE)
NASA Technical Reports Server (NTRS)
Brady, D. Michael; Ford, Donnie R.
1990-01-01
A description of the Intelligent Data Reduction (IDARE) expert system and an IDARE user's manual are given. IDARE is a data reduction system with the addition of a user profile infrastructure. The system was tested on a nickel-cadmium battery testbed. Information is given on installing, loading, maintaining the IDARE system.
Development of guided horizontal boring tools. Final report, June 1984-March 1991
DOE Office of Scientific and Technical Information (OSTI.GOV)
McDonald, W.J.; Herben, W.C.; Pittard, G.T.
Maurer Engineering Inc. (MEI), under a contract with the Gas Research Institute (GRI), has led a team of research and manufacturing companies with the goal of developing a guided boring tool for installing gas distribution piping. Studies indicated guided horizontal boring systems can provide gas utilities with a more effective and economical method for installing pipe than conventional techniques with a potential cost savings of at least 15% to 50%. A comprehensive state of technology review of horizontal boring tools identified concepts appropriate to being directionally controlled. Development of a universal system was found impractical because the requirements for shortmore » and extended range systems are significantly different. Concepts for steering and tracking were evaluated through lab and field experiments which progressed from proof of concept tests to cooperative field tests with gas utilities at the various stages of system development. The systems were brought to commercial status with needed modifications and the technology transferred to licensees who would market the systems. The program resulted in the development and commercialization of five distinct guided boring system. Pipe can now be installed more rapidly over longer distances with a minimal amount of excavation required for launching and retrieval. This means increased work crew productivity, reduced disturbance to landscaping and environmentally sensitive areas, and reduced traffic disruption and public inconvenience.« less
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 2 2012-10-01 2012-10-01 false Tests. 58.16-19 Section 58.16-19 Shipping COAST GUARD... SYSTEMS Liquefied Petroleum Gases for Cooking and Heating § 58.16-19 Tests. (a) Installation. (1) After... tests prescribed in paragraph (a)(1) of this section, the distribution tubing shall be connected to the...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 2 2013-10-01 2013-10-01 false Tests. 58.16-19 Section 58.16-19 Shipping COAST GUARD... SYSTEMS Liquefied Petroleum Gases for Cooking and Heating § 58.16-19 Tests. (a) Installation. (1) After... tests prescribed in paragraph (a)(1) of this section, the distribution tubing shall be connected to the...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 2 2014-10-01 2014-10-01 false Tests. 58.16-19 Section 58.16-19 Shipping COAST GUARD... SYSTEMS Liquefied Petroleum Gases for Cooking and Heating § 58.16-19 Tests. (a) Installation. (1) After... tests prescribed in paragraph (a)(1) of this section, the distribution tubing shall be connected to the...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 2 2011-10-01 2011-10-01 false Tests. 58.16-19 Section 58.16-19 Shipping COAST GUARD... SYSTEMS Liquefied Petroleum Gases for Cooking and Heating § 58.16-19 Tests. (a) Installation. (1) After... tests prescribed in paragraph (a)(1) of this section, the distribution tubing shall be connected to the...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 2 2010-10-01 2010-10-01 false Tests. 58.16-19 Section 58.16-19 Shipping COAST GUARD... SYSTEMS Liquefied Petroleum Gases for Cooking and Heating § 58.16-19 Tests. (a) Installation. (1) After... tests prescribed in paragraph (a)(1) of this section, the distribution tubing shall be connected to the...
Blind spot monitoring in light vehicles -- system performance.
DOT National Transportation Integrated Search
2014-07-01
This report summarizes findings of a small population study of blind spot monitoring systems (BSM) installed by : original vehicle manufacturers on standard production vehicles. The primary goals of these tests were to simulate real-world driving sce...
47 CFR 27.1164 - The cost-sharing formula.
Code of Federal Regulations, 2011 CFR
2011-10-01
... control equipment; engineering costs (design/path survey); installation; systems testing; FCC filing costs... plant upgrade (if required); electrical grounding systems; Heating Ventilation and Air Conditioning (HVAC) (if required); alternate transport equipment; and leased facilities. Increased recurring costs...
47 CFR 27.1164 - The cost-sharing formula.
Code of Federal Regulations, 2012 CFR
2012-10-01
... control equipment; engineering costs (design/path survey); installation; systems testing; FCC filing costs... plant upgrade (if required); electrical grounding systems; Heating Ventilation and Air Conditioning (HVAC) (if required); alternate transport equipment; and leased facilities. Increased recurring costs...
Cooling Tests of an Airplane Equipped with an NACA Cowling and a Wing-duct Cooling System
NASA Technical Reports Server (NTRS)
Turner, L I , Jr; Bierman, David; Boothy, W B
1941-01-01
Cooling tests were made of a Northrop A-17A attack airplane successively equipped with a conventional.NACA cowling and with a wing-duct cooling system. The method of cooling the engine by admitting air from the propeller slipstream into wing ducts, passing it first through the accessory compartment and then over the engine from rear to front, appeared to offer possibilities for improved engine cooling, increased cooling of the accessories, and better fairing of the power-plant installation. The results showed that ground cooling for the wing duct system without cowl flap was better than for the NACA cowling with flap; ground cooling was appreciably improved by installing a cowl flap. Satisfactory temperatures were maintained in both climb and high-speed flight, but, with the use of conventional baffles, a greater quantity of cooling air appeared to be required for the wing duct system.
Helicopter precision approach capability using the Global Positioning System
NASA Technical Reports Server (NTRS)
Kaufmann, David N.
1992-01-01
The period between 1 July and 31 December, 1992, was spent developing a research plan as well as a navigation system document and flight test plan to investigate helicopter precision approach capability using the Global Positioning System (GPS). In addition, all hardware and software required for the research was acquired, developed, installed, and verified on both the test aircraft and the ground-based reference station.
AC propulsion system for an electric vehicle, phase 2
NASA Astrophysics Data System (ADS)
Slicker, J. M.
1983-06-01
A second-generation prototype ac propulsion system for a passenger electric vehicle was designed, fabricated, tested, installed in a modified Mercury Lynx vehicle and track tested at the Contractor's site. The system consisted of a Phase 2, 18.7 kw rated ac induction traction motor, a 192-volt, battery powered, pulse-width-modulated, transistorized inverter packaged for under rear seat installation, a 2-axis, 2-speed, automatically-shifted mechanical transaxle and a microprocessor-based powertrain/vehicle controller. A diagnostics computer to assist tuning and fault finding was fabricated. Dc-to-mechanical-system efficiency varied from 78% to 82% as axle speed/torque ranged from 159 rpm/788 nm to 65 rpm/328 nm. Track test efficiency results suggest that the ac system will be equal or superior to dc systems when driving urban cycles. Additional short-term work is being performed under a third contract phase (AC-3) to raise transaxle efficiency to predicted levels, and to improve starting and shifting characteristics. However, the long-term challenge to the system's viability remains inverter cost. A final report on the Phase 2 system, describing Phase 3 modifications, will be issued at the conclusion of AC-3.
AC propulsion system for an electric vehicle, phase 2
NASA Technical Reports Server (NTRS)
Slicker, J. M.
1983-01-01
A second-generation prototype ac propulsion system for a passenger electric vehicle was designed, fabricated, tested, installed in a modified Mercury Lynx vehicle and track tested at the Contractor's site. The system consisted of a Phase 2, 18.7 kw rated ac induction traction motor, a 192-volt, battery powered, pulse-width-modulated, transistorized inverter packaged for under rear seat installation, a 2-axis, 2-speed, automatically-shifted mechanical transaxle and a microprocessor-based powertrain/vehicle controller. A diagnostics computer to assist tuning and fault finding was fabricated. Dc-to-mechanical-system efficiency varied from 78% to 82% as axle speed/torque ranged from 159 rpm/788 nm to 65 rpm/328 nm. Track test efficiency results suggest that the ac system will be equal or superior to dc systems when driving urban cycles. Additional short-term work is being performed under a third contract phase (AC-3) to raise transaxle efficiency to predicted levels, and to improve starting and shifting characteristics. However, the long-term challenge to the system's viability remains inverter cost. A final report on the Phase 2 system, describing Phase 3 modifications, will be issued at the conclusion of AC-3.
2008-04-01
A full-scale flight-test mockup of the Constellation program's Orion crew vehicle arrived at NASA's Dryden Flight Research Center in late March 2008 to undergo preparations for the first short-range flight test of the spacecraft's astronaut escape system later that year. Engineers and technicians at NASA's Langley Research Center fabricated the structure, which precisely represents the size, outer shape and mass characteristics of the Orion space capsule. The Orion crew module mockup was ferried to NASA Dryden on an Air Force C-17. After painting in the Edwards Air Force Base paint hangar, the conical capsule was taken to Dryden for installation of flight computers, instrumentation and other electronics prior to being sent to the U.S. Army's White Sands Missile Range in New Mexico for integration with the escape system and the first abort flight test in late 2008. The tests were designed to ensure a safe, reliable method of escape for astronauts in case of an emergency.
Testing and Validation of Timing Properties for High Speed Digital Cameras - A Best Practices Guide
2016-07-27
a five year plan to begin replacing its inventory of antiquated film and video systems with more modern and capable digital systems. As evidenced in...installation, testing, and documentation of DITCS. If shop support can be accelerated due to shifting mission priorities, this schedule can likely...assistance from the machine shop , welding shop , paint shop , and carpenter shop . Testing the DITCS system will require a KTM with digital cameras and
ERIC Educational Resources Information Center
Anagnostopoulos, Dorothea; Rutledge, Stacey; Bali, Valentina
2013-01-01
This article examines how SEAs in three states designed, installed, and operated statewide, longitudinal student information systems (SLSIS). SLSIS track individual students' progress in K-12 schools, college, and beyond and link it to individual schools and teachers. They are key components of the information infrastructure of test-based…
Code of Federal Regulations, 2011 CFR
2011-07-01
... performance test deadline for PM CEMS. Relative accuracy testing for other CEMS need not be repeated if that... system. (i) Installation of the continuous monitoring system sampling probe or other interface at a... equipment specifications for the sample interface, the pollutant concentration or parametric signal analyzer...
Verification testing of the Practical Best Management, Inc., CrystalStream™ stormwater treatment system was conducted over a 15-month period starting in March, 2003. The system was installed in a test site in Griffin, Georgia, and served a drainage basin of approximately 4 ...
14 CFR Appendix C to Part 27 - Criteria for Category A
Code of Federal Regulations, 2013 CFR
2013-01-01
... unless it meets the design installation and performance requirements contained in this appendix in... drive system: Design. 29.927(c)(1)—Additional tests. 29.953(a)—Fuel system independence. 29.1027(a)—Transmission and gearboxes: General. 29.1045(a)(1), (b), (c), (d), and (f)—Climb cooling test procedures. 29...
14 CFR 25.1015 - Oil tank tests.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Oil tank tests. 25.1015 Section 25.1015... STANDARDS: TRANSPORT CATEGORY AIRPLANES Powerplant Oil System § 25.1015 Oil tank tests. Each oil tank must be designed and installed so that— (a) It can withstand, without failure, each vibration, inertia...
Cassini's RTGs undergo mechanical and electrical verification testing in the PHSF
NASA Technical Reports Server (NTRS)
1997-01-01
Jet Propulsion Laboratory (JPL) engineers examine the interface surface on the Cassini spacecraft prior to installation of the third radioisotope thermoelectric generator (RTG). The other two RTGs, at left, already are installed on Cassini. The three RTGs will be used to power Cassini on its mission to the Saturnian system. They are undergoing mechanical and electrical verification testing in the Payload Hazardous Servicing Facility. RTGs use heat from the natural decay of plutonium to generate electric power. The generators enable spacecraft to operate far from the Sun where solar power systems are not feasible. The Cassini mission is scheduled for an Oct. 6 launch aboard a Titan IVB/Centaur expendable launch vehicle. Cassini is built and managed for NASA by JPL.
1997-07-18
This radioisotope thermoelectric generator (RTG), at center, is ready for electrical verification testing now that it has been installed on the Cassini spacecraft in the Payload Hazardous Servicing Facility. A handling fixture, at far left, remains attached. This is the third and final RTG to be installed on Cassini for the prelaunch tests. The RTGs will provide electrical power to Cassini on its 6.7-year trip to the Saturnian system and during its four-year mission at Saturn. RTGs use heat from the natural decay of plutonium to generate electric power. The generators enable spacecraft to operate at great distances from the Sun where solar power systems are not feasible. The Cassini mission is targeted for an Oct. 6 launch aboard a Titan IVB/Centaur expendable launch vehicle
SMART operational field test evaluation : scheduler survey report : final report
DOT National Transportation Integrated Search
1997-06-01
The Suburban Mobility Authority for Regional Transportation (SMART) has installed an automatic scheduling and dispatch system (ASD) in Southeast Michigan in accordance with their plans to implement ITS as a site for an operational field test. The pur...
Cabana Multi-User Spaceport Tour of KSC
2017-02-17
Members of the news media view the 10 levels of new work platforms in High Bay 3 inside the Vehicle Assembly Building (VAB) during a tour of NASA's Kennedy Space Center in Florida with Center Director Bob Cabana. The final platform, A north, was recently installed. The platforms will surround the Space Launch System and Orion spacecraft on the mobile launcher during processing to prepare for the first test flight. The Ground Systems Development and Operations Program is overseeing upgrades to the VAB, including installation of the new work platforms.
2007-02-16
KENNEDY SPACE CENTER, FLA. -- Inside the Space Station Processing Facility at Kennedy Space Center, workers from the Japan Aerospace Exploration Agency watch from a control area as the Remote Manipulator System, or robotic arm, is attached to a hoisting device to prepare it for installation to the Japanese Experiment Module for testing. The RMS is one of the payloads scheduled to be delivered to the station on a future mission tentatively scheduled for 2008. The RMS is similar to the robotic arm already installed on the station's mobile base system. Photo credit: NASA/Amanda Diller
RELIABILITY TESTING OF AN ON-HARVESTER COTTON WEIGHT MEASUREMENT SYSTEM
USDA-ARS?s Scientific Manuscript database
A system for weighing seed cotton onboard stripper harvesters was developed and installed on several producer owned and operated machines. The weight measurement system provides critical information to producers when in the process of calibrating yield monitors or conducting on-farm research. The ...
FIELD DEMONSTRATION OF THE LINDE OXYGEN COMBUSTION SYSTEM ON THE EPA MOBILE INCINERATOR
This paper summarizes the various system performance tests and the long-term operating experience of the LINDE Oxygen Combustion System installed on the U.S. Environmental Protection Agency's Mobile Incineration System (MIS) when it was in operation at the Denney Farm site in sou...
ERIC Educational Resources Information Center
Air Force Occupational Measurement Center, Lackland AFB, TX.
The Avionics Instrument Systems career ladder (AFSC 325X1) provides flight line and shop maintenance training on aircraft instrument systems, electromechancial instruments, components, and test equipment. Duties involve inspecting, removing, installing, repairing, operating, troubleshooting, overhauling, and modifying systems such as flight and…
Thermal Performance of Cryogenic Piping Multilayer Insulation in Actual Field Installations
NASA Technical Reports Server (NTRS)
Fesmire, J.; Augustnynowicz, S.; Thompson, K. (Technical Monitor)
2002-01-01
A standardized way of comparing the thermal performance of different pipelines in different sizes is needed. Vendor data for vacuum-insulated piping are typically given in heat leak rate per unit length (W/m) for a specific diameter pipeline. An overall k-value for actual field installations (k(sub oafi)) is therefore proposed as a more generalized measure for thermal performance comparison and design calculation. The k(sub oafi) provides a direct correspondence to the k-values reported for insulation materials and illustrates the large difference between ideal multilayer insulation (MLI) and actual MLI performance. In this experimental research study, a section of insulated piping was tested under cryogenic vacuum conditions, including simulated spacers and bending. Several different insulation systems were tested using a 1-meter-long cylindrical cryostat test apparatus. The simulated spacers tests showed significant degradation in the thermal performance of a given insulation system. An 18-meter-long pipeline test apparatus is now in operation at the Cryogenics Test Laboratory, NASA Kennedy Space Center, for conducting liquid nitrogen thermal performance tests.
Prototype solar heating and cooling systems
NASA Technical Reports Server (NTRS)
1979-01-01
A combination of monthly progress reports are presented. It contains a summary of activities and progress made from November 1, 1978, to February 28, 1979. The effort calls for the development, manufacture, test, system installation, maintenance, problem resolution, and performance evaluation.
Aviation Careers Series: Women in Aviation
DOT National Transportation Integrated Search
1992-01-01
TRANSMIT, TRANSCOM's System for Managing Incidents and Traffic, has been installed on approximately 19 miles of the New York State. Thruway and the Garden State Parkway in New Jersey. This system is an FHWA funded operational test to determine if Ele...
47 CFR 24.243 - The cost-sharing formula.
Code of Federal Regulations, 2014 CFR
2014-10-01
...; monitoring or control equipment; engineering costs (design/path survey); installation; systems testing; FCC... control; power plant upgrade (if required); electrical grounding systems; Heating Ventilation and Air Conditioning (HVAC) (if required); alternate transport equipment; and leased facilities. C also includes...
47 CFR 24.243 - The cost-sharing formula.
Code of Federal Regulations, 2013 CFR
2013-10-01
...; monitoring or control equipment; engineering costs (design/path survey); installation; systems testing; FCC... control; power plant upgrade (if required); electrical grounding systems; Heating Ventilation and Air Conditioning (HVAC) (if required); alternate transport equipment; and leased facilities. C also includes...
47 CFR 24.243 - The cost-sharing formula.
Code of Federal Regulations, 2012 CFR
2012-10-01
...; monitoring or control equipment; engineering costs (design/path survey); installation; systems testing; FCC... control; power plant upgrade (if required); electrical grounding systems; Heating Ventilation and Air Conditioning (HVAC) (if required); alternate transport equipment; and leased facilities. C also includes...
47 CFR 24.243 - The cost-sharing formula.
Code of Federal Regulations, 2011 CFR
2011-10-01
...; monitoring or control equipment; engineering costs (design/path survey); installation; systems testing; FCC... control; power plant upgrade (if required); electrical grounding systems; Heating Ventilation and Air Conditioning (HVAC) (if required); alternate transport equipment; and leased facilities. C also includes...
Level-2 Milestone 3244: Deploy Dawn ID Machine for Initial Science Runs
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fox, D
2009-09-21
This report documents the delivery, installation, integration, testing, and acceptance of the Dawn system, ASC L2 milestone 3244: Deploy Dawn ID Machine for Initial Science Runs, due September 30, 2009. The full text of the milestone is included in Attachment 1. The description of the milestone is: This milestone will be a result of work started three years ago with the planning for a multi-petaFLOPS UQ-focused platform (Sequoia) and will be satisfied when a smaller ID version of the final system is delivered, installed, integrated, tested, accepted, and deployed at LLNL for initial science runs in support of SSP mission.more » The deliverable for this milestone will be a LA petascale computing system (named Dawn) usable for code development and scaling necessary to ensure effective use of a final Sequoia platform (expected in 2011-2012), and for urgent SSP program needs. Allocation and scheduling of Dawn as an LA system will likely be performed informally, similar to what has been used for BlueGene/L. However, provision will be made to allow for dedicated access times for application scaling studies across the entire Dawn resource. The milestone was completed on April 1, 2009, when science runs began running on the Dawn system. The following sections describe the Dawn system architecture, current status, installation and integration time line, and testing and acceptance process. A project plan is included as Attachment 2. Attachment 3 is a letter certifying the handoff of the system to a nuclear weapons stockpile customer. Attachment 4 presents the results of science runs completed on the system.« less
2009-06-05
CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, new, hurricane-rated window systems for the Launch Control Center's four Firing Rooms and the vestibule areas between Firing Rooms 1 & 2 and Firing Rooms 3 & 4 are being installed. In order to avoid operational impacts, the new windows are being installed on the outside of the existing windows, enclosing the space formerly occupied by the louvers, and the old windows will remain in place until the new windows are completely installed and leak tested. This approach will continue to keep the firing rooms from being exposed to the elements. Photo credit: NASA/Tim Jacobs
2009-06-05
CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, new, hurricane-rated window systems for the Launch Control Center's four Firing Rooms and the vestibule areas between Firing Rooms 1 & 2 and Firing Rooms 3 & 4 are being installed. In order to avoid operational impacts, the new windows are being installed on the outside of the existing windows, enclosing the space formerly occupied by the louvers, and the old windows will remain in place until the new windows are completely installed and leak tested. This approach will continue to keep the firing rooms from being exposed to the elements. Photo credit: NASA/Tim Jacobs
2009-06-05
CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, new, hurricane-rated window systems for the Launch Control Center's four Firing Rooms and the vestibule areas between Firing Rooms 1 & 2 and Firing Rooms 3 & 4 are being installed. In order to avoid operational impacts, the new windows are being installed on the outside of the existing windows, enclosing the space formerly occupied by the louvers, and the old windows will remain in place until the new windows are completely installed and leak tested. This approach will continue to keep the firing rooms from being exposed to the elements. Photo credit: NASA/Tim Jacobs
2009-06-05
CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, new, hurricane-rated window systems for the four Firing Rooms and the vestibule areas between Firing Rooms 1 & 2 and Firing Rooms 3 & 4 are being installed. In order to avoid operational impacts, the new windows are being installed on the outside of the existing windows, enclosing the space formerly occupied by the louvers, and the old windows will remain in place until the new windows are completely installed and leak tested. This approach will continue to keep the firing rooms from being exposed to the elements. Photo credit: NASA/Tim Jacobs
2009-06-05
CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, new, hurricane-rated window systems for the Launch Control Center's four Firing Rooms and the vestibule areas between Firing Rooms 1 & 2 and Firing Rooms 3 & 4 are being installed. In order to avoid operational impacts, the new windows are being installed on the outside of the existing windows, enclosing the space formerly occupied by the louvers, and the old windows will remain in place until the new windows are completely installed and leak tested. This approach will continue to keep the firing rooms from being exposed to the elements. Photo credit: NASA/Tim Jacobs
2009-06-05
CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, new, hurricane-rated window systems for the Launch Control Center's four Firing Rooms and the vestibule areas between Firing Rooms 1 & 2 and Firing Rooms 3 & 4 are being installed. In order to avoid operational impacts, the new windows are being installed on the outside of the existing windows, enclosing the space formerly occupied by the louvers, and the old windows will remain in place until the new windows are completely installed and leak tested. This approach will continue to keep the firing rooms from being exposed to the elements. Photo credit: NASA/Tim Jacobs
2009-06-05
CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, new, hurricane-rated window systems for the Launch Control Center's four Firing Rooms and the vestibule areas between Firing Rooms 1 & 2 and Firing Rooms 3 & 4 are being installed. In order to avoid operational impacts, the new windows are being installed on the outside of the existing windows, enclosing the space formerly occupied by the louvers, and the old windows will remain in place until the new windows are completely installed and leak tested. This approach will continue to keep the firing rooms from being exposed to the elements. Photo credit: NASA/Tim Jacobs
2004-04-28
KENNEDY SPACE CENTER, FLA. - Workers in the Orbiter Processing Facility remove Ground Support Equipment used to install Discovery’s nose cap on Friday. The nose cap had been removed from the vehicle in the summer of 2003 and returned to the vendor, where it underwent numerous forms of Non-Destructive Evaluation. These tests included X-ray, ultrasound and eddy current to ensure its structural integrity prior to installation on the vehicle. The nose cap was also recoated. Once returned to KSC, new Thermal Protection System blankets were assembled inside of the nose cap and thermography was performed prior to installation on the orbiter.
2004-04-28
KENNEDY SPACE CENTER, FLA. - Workers in the Orbiter Processing Facility get ready to remove Ground Support Equipment used to install Discovery’s nose cap on Friday. The nose cap had been removed from the vehicle in the summer of 2003 and returned to the vendor, where it underwent numerous forms of Non-Destructive Evaluation. These tests included X-ray, ultrasound and eddy current to ensure its structural integrity prior to installation on the vehicle. The nose cap was also recoated. Once returned to KSC, new Thermal Protection System blankets were assembled inside of the nose cap and thermography was performed prior to installation on the orbiter.
NASA Astrophysics Data System (ADS)
Vivas Veloso, J. A.; Christie, D. R.; Hoffmann, T. L.; Campus, P.; Bell, M.; Langlois, A.; Martysevich, P.; Demirovik, E.; Carvalho, J.; Kramer, A.; Wu, Sean F.
2002-11-01
The provisional operation and maintenance of IMS infrasound stations after installation and subsequent certification has the objective to prepare the infrasound network for entry into force of the Comprehensive Nuclear-Test-Ban Treaty (CTBT). The goal is to maintain and fine tune the technical capabilities of the network, to repair faulty equipment, and to ensure that stations continue to meet the minimum specifications through evaluation of data quality and station recalibration. Due to the globally dispersed nature of the network, this program constitutes a significant undertaking that requires careful consideration of possible logistic approaches and their financial implications. Currently, 11 of the 60 IMS infrasound stations are transmitting data in the post-installation Testing & Evaluation mode. Another 5 stations are under provisional operation and are maintained in post-certification mode. It is expected that 20% of the infrasound network will be certified by the end of 2002. This presentation will focus on the different phases of post-installation activities of the IMS infrasound program and the logistical challenges to be tackled to ensure a cost-efficient management of the network. Specific topics will include Testing & Evaluation and Certification of Infrasound Stations, as well as Configuration Management and Network Sustainment.
WTS-4 system verification unit for wind/hydroelectric integration study
NASA Technical Reports Server (NTRS)
Watts, A. W.
1982-01-01
The Bureau of Reclamation (Reclamation) initiated a study to investigate the concept of integrating 100 MW of wind energy from megawatt-size wind turbines with the Federal hydroelectric system. As a part of the study, one large wind turbine was purchased through the competitive bid process and is now being installed to serve as a system verification unit (SVU). Reclamation negotiated an agreement with NASA to provide technical management of the project for the design, fabrication, installation, testing, and initial operation. Hamilton Standard was awarded a contract to furnish and install its WTS-4 wind turbine rated at 4 MW at a site near Medicine Bow, Wyoming. The purposes for installing the SVU are to fully evaluate the wind/hydro integration concept, make technical evaluation of the hardware design, train personnel in the technology, evaluate operation and maintenance aspects, and evaluate associated environmental impacts. The SVU will be operational in June 1982. Data from the WTS-4 and from a second SVU, Boeing's MOD-2, will be used to prepare a final design for a 100-MW farm if Congress authorizes the project.
New Approach to Sea Level Monitoring Tested at Shemya, Alaska
NASA Astrophysics Data System (ADS)
Urban, G. W.; Medbery, A. H.; Burgy, M. C.
2003-12-01
Due to the prohibitive installation cost to replace a storm damaged stilling well type tide gauge at Earickson Air Force Station on Shemya Island, Alaska, an alternative sea-level gauge was sought by the West Coast and Alaska Tsunami Warning Center (WCATWC). An Omart-Vega radar system was chosen as the alternative, since it had low power needs, did not require a stilling well and its design included observation of rough surface liquids. The Omart-Vega radar system works by emitting a 5 gHz radar wave which reflects off the water surface and then back to the unit at a specified rate. This information is then telemetered directly to a computer which records the sample. Although the cost of the Vega system (3500USD) was similar to that of the stilling well unit (2500USD), the comparison of the installation costs of the two different units was an issue. To install the stilling well system, two certified under-water welding divers were required at a cost of 40K-USD or more. In comparison, the installation of the Vega system simply required an arm constructed so as to hang and support the Vega unit off the pier at Shemya. This arm assembly would also house the unit to protect it from surf and weather. The arm was designed in-house and built by a local metal contractor for less than 500USD. This portable unit was sent to Shemya via C-130 aircraft. The arm assembly and housed radar tide gauge was installed by one person. The circuitry to run the Vega was developed and tested at the WCATWC. Software was designed and tested there as well, although the software was written by Omart at no cost to the Warning Center. The circuitry allows for direct remote reconfiguration from Palmer to the radar system. The Vega is accessed by software directly from the WCATWC computer to sample the water level at numerous settable sample rates, which include one second, five second, fifteen second, and thirty second. After nearly one year of operation at Earickson, which included many major storms, the radar unit is proving to be a reliable substitute for the previous stilling well type gauge.
2013-11-07
CAPE CANAVERAL, Fla. – At NASA’s Kennedy Space Center in Florida, three ogive panels have been installed on the Orion ground test vehicle in Vehicle Assembly Building high bay 4. The fourth ogive panel is being lifted by crane for installation. The ogive panels enclose and protect the Orion spacecraft and attach to the Launch Abort System. The test vehicle is being used by the Ground Systems Development and Operations Program for path finding operations, including simulated manufacturing, assembly and stacking procedures. Orion is the exploration spacecraft designed to carry astronauts to destinations not yet explored by humans, including an asteroid and Mars. It will have emergency abort capability, sustain the crew during space travel and provide safe re-entry from deep space return velocities. The first unpiloted test flight of Orion is scheduled to launch in 2014 atop a Delta IV rocket and in 2017 on NASA’s Space Launch System rocket. For more information, visit www.nasa.gov/orion. Photo credit: Kim Shiflett
Asetek's Warm-Water Liquid Cooling System Yields Energy Cost Savings at
NREL | Energy Systems Integration Facility | NREL Asetek Asetek's Warm-Water Liquid Cooling System Yields Energy Cost Savings at NREL Asetek's RackCDU liquid cooling system was installed and tested at the Energy Systems Integration Facility's (ESIF's) ultra-energy-efficient high-performance
Monitoring of the electrical parameters in off-grid solar power system
NASA Astrophysics Data System (ADS)
Idzkowski, Adam; Leoniuk, Katarzyna; Walendziuk, Wojciech
2016-09-01
The aim of this work was to make a monitoring dedicated to an off-grid installation. A laboratory set, which was built for that purpose, was equipped with a PV panel, a battery, a charge controller and a load. Additionally, to monitor electrical parameters from this installation there were used: LabJack module (data acquisition card), measuring module (self-built) and a computer with a program, which allows to measure and present the off-grid installation parameters. The program was made in G language using LabVIEW software. The designed system enables analyzing the currents and voltages of PV panel, battery and load. It makes also possible to visualize them on charts and to make reports from registered data. The monitoring system was also verified by a laboratory test and in real conditions. The results of this verification are also presented.
Information Management Platform for Data Analytics and Aggregation (IMPALA) System Design Document
NASA Technical Reports Server (NTRS)
Carnell, Andrew; Akinyelu, Akinyele
2016-01-01
The System Design document tracks the design activities that are performed to guide the integration, installation, verification, and acceptance testing of the IMPALA Platform. The inputs to the design document are derived from the activities recorded in Tasks 1 through 6 of the Statement of Work (SOW), with the proposed technical solution being the completion of Phase 1-A. With the documentation of the architecture of the IMPALA Platform and the installation steps taken, the SDD will be a living document, capturing the details about capability enhancements and system improvements to the IMPALA Platform to provide users in development of accurate and precise analytical models. The IMPALA Platform infrastructure team, data architecture team, system integration team, security management team, project manager, NASA data scientists and users are the intended audience of this document. The IMPALA Platform is an assembly of commercial-off-the-shelf (COTS) products installed on an Apache-Hadoop platform. User interface details for the COTS products will be sourced from the COTS tools vendor documentation. The SDD is a focused explanation of the inputs, design steps, and projected outcomes of every design activity for the IMPALA Platform through installation and validation.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sullivan, W.N.
This report summarizes measured performance of residential geothermal heat pumps (GHP`s) that were installed in family housing units at Ft. Hood, Texas and at Selfridge Air National Guard base in Michigan. These units were built as part of a joint Department of Defense/Department of Energy program to evaluate the energy savings potential of GHP`s installed at military facilities. At the Ft. Hood site, the GHP performance was compared to conventional forced air electric air conditioning and natural gas heating. At Selfridge, the homes under test were originally equipped with electric baseboard heat and no air conditioning. Installation of the GHPmore » systems at both sites was straightforward but more problems and costs were incurred at Selfridge because of the need to install ductwork in the homes. The GHP`s at both sites produced impressive energy savings. These savings approached 40% for most of the homes tested. The low cost of energy on these bases relative to the incremental cost of the GHP conversions precludes rapid payback of the GHP`s from energy savings alone. Estimates based on simple payback (no inflation and no interest on capital) indicated payback times from 15 to 20 years at both sites. These payback times may be reduced by considering the additional savings possible due to reduced maintenance costs. Results are summarized in terms of 15 minute, hourly, monthly, and annual performance parameters. The results indicate that all the systems were working properly but several design shortcomings were identified. Recommendations are made for improvements in future installations at both sites.« less
NASA Astrophysics Data System (ADS)
Paufique, Jérôme; Madec, Pierre-Yves; Kolb, Johann; Kuntschner, Harald; Argomedo, Javier; Kiekebusch, Mario J.; Donaldson, Robert H.; Arsenault, Robin; Siebenmorgen, Ralf; Soenke, Christian; Tordo, Sebastien; Conzelmann, Ralf D.; Jost, Andreas; Reyes-Moreno, Javier; Downing, Mark; Hibon, Pascale; Valenzuela, Jose Javier; Haguenauer, Pierre
2016-07-01
GRAAL is the adaptive optics module feeding the wide-field IR imager HAWK-I at the VLT observatory. As part of the adaptive optics facility, GRAAL is equipped with 4 Laser-guide star wave-front sensors and provides a large field-of-view, ground layer correction system to HAWK-I. After a successful testing in Europe, the module has been re-assembled in Chile and installed at the Nasmyth-A platform of Yepun, the fourth Unit telescope of the observatory. We report on the installation of GRAAL on the mountain and on its first testing in stand-alone and on-sky.
11. Interior view of control room in Components Test Laboratory ...
11. Interior view of control room in Components Test Laboratory (T-27), looking north. Photograph shows upgraded instrumentation, piping, and technological modifications installed in 1997-99 to accommodate component testing requirements for the Atlas V missile. - Air Force Plant PJKS, Systems Integration Laboratory, Components Test Laboratory, Waterton Canyon Road & Colorado Highway 121, Lakewood, Jefferson County, CO
Code of Federal Regulations, 2014 CFR
2014-10-01
... using liquefied petroleum gas (LPG) and compressed natural gas (CNG) must meet the following... design, installation and testing of each CNG system must meet ABYC A-22, “Marine Compressed Natural Gas (CNG) Systems,” Chapter 6 of NFPA 302, or other standard specified by the Commandant. (c) Cooking...
NASA Technical Reports Server (NTRS)
2003-01-01
KENNEDY SPACE CENTER, FLA. -- In the Orbiter Processing Facility, United Space Alliance employee Dave Sanborn (left) conducts a bond verification test on Thermal Protection System tiles installed on a main landing gear door of Space Shuttle orbiter Enterprise (OV-101). Sections of Enterprise were borrowed from the Smithsonian Institution's Air and Space Museum where the orbiter is being stored at the Washington Dulles International Airport. Enterprise was the first orbiter built in the Shuttle fleet and was used to conduct the Approach and Landing Test Program before the first powered Shuttle flight. After the tile installation is complete, the sections will be transferred to the Southwest Research Institute for testing requested by the Columbia Accident Investigation Board.
12. Interior view of Test Cell 9 (fuel) in Components ...
12. Interior view of Test Cell 9 (fuel) in Components Test Laboratory (T-27), showing north and east walls. Photograph shows upgraded instrumentation, piping, and technological modifications installed in 1997-99 to accommodate testing requirements for the Atlas V missile. - Air Force Plant PJKS, Systems Integration Laboratory, Components Test Laboratory, Waterton Canyon Road & Colorado Highway 121, Lakewood, Jefferson County, CO
17. Interior view of Test Cell 8 (oxidizer) in Components ...
17. Interior view of Test Cell 8 (oxidizer) in Components Test Laboratory (T-27), showing west and north walls. Photograph shows upgraded instrumentation, piping, and technological modifications installed in 1997-99 to accommodate component testing requirements for the Atlas V missile. - Air Force Plant PJKS, Systems Integration Laboratory, Components Test Laboratory, Waterton Canyon Road & Colorado Highway 121, Lakewood, Jefferson County, CO
14. Interior view of Test Cell 10 (environmental) in Components ...
14. Interior view of Test Cell 10 (environmental) in Components Test Laboratory (T-27), showing east and south walls. Photograph shows upgraded instrumentation, piping, and technological modifications installed in 1997-99 to accommodate component testing requirements for the Atlas V missile. - Air Force Plant PJKS, Systems Integration Laboratory, Components Test Laboratory, Waterton Canyon Road & Colorado Highway 121, Lakewood, Jefferson County, CO
Evaluation of aftermarket LPG conversion kits in light-duty vehicle applications. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bass, E A
1993-06-01
SwRI was contracted by NREL to evaluate three LPG conversion kits on a Chevrolet Lumina. The objective of the project was to measure the Federal Test Procedure (FTP) emissions and fuel economy of these kits, and compare their performance to gasoline-fueled operation and to each other. Varying LPG fuel blends allowed a preliminary look at the potential for fuel system disturbance. The project required kit installation and adjustment according to manufacturer`s instructions. A limited amount of trouble diagnosis was also performed on the fuel systems. A simultaneous contract from the Texas Railroad Commission, in cooperation with NREL, provided funds formore » additional testing with market fuels (HD5 propane and industry average gasoline) and hydrocarbon (HC) emissions speciation to determine the ozone-forming potential of LPG HC emissions. This report documents the procurement, installation, and testing of these LPG conversion kits.« less
Solar heating and cooling systems design and development
NASA Technical Reports Server (NTRS)
1977-01-01
The development and delivery of eight prototype solar heating and cooling systems for installation and operational test was reported. Two heating and six heating and cooling units will be delivered for single family residences, multiple family residences and commercial applications.
47 CFR 27.1164 - The cost-sharing formula.
Code of Federal Regulations, 2013 CFR
2013-10-01
...); installation; systems testing; FCC filing costs; site acquisition and civil works; zoning costs; training... upgrades for interference control; power plant upgrade (if required); electrical grounding systems; Heating Ventilation and Air Conditioning (HVAC) (if required); alternate transport equipment; and leased facilities...
NASA Technical Reports Server (NTRS)
Carchedi, C. H.; Gough, T. L.; Huston, H. A.
1983-01-01
The results of a variety of tests designed to demonstrate and evaluate the performance of several commercially available data base management system (DBMS) products compatible with the Digital Equipment Corporation VAX 11/780 computer system are summarized. The tests were performed on the INGRES, ORACLE, and SEED DBMS products employing applications that were similar to scientific applications under development by NASA. The objectives of this testing included determining the strength and weaknesses of the candidate systems, performance trade-offs of various design alternatives and the impact of some installation and environmental (computer related) influences.
Code of Federal Regulations, 2012 CFR
2012-07-01
... for water removed from the sample done in post-processing according to § 1065.659 and it does not... initial installation (i.e., test cell commissioning) and after any modifications to the system that would... concentration is updated and recorded at an appropriate frequency to prevent loss of information. This test also...
Code of Federal Regulations, 2011 CFR
2011-07-01
... for water removed from the sample done in post-processing according to § 1065.659 and it does not... initial installation (i.e., test cell commissioning) and after any modifications to the system that would... concentration is updated and recorded at an appropriate frequency to prevent loss of information. This test also...
NASA Astrophysics Data System (ADS)
Miccoli, M.; Usai, A.; Tafuto, A.; Albertoni, A.; Togna, F.
2016-10-01
The propagation environment around airborne platforms may significantly degrade the performance of Electro-Optical (EO) self-protection systems installed onboard. To ensure the sufficient level of protection, it is necessary to understand that are the best sensors/effectors installation positions to guarantee that the aeromechanical turbulence, generated by the engine exhausts and the rotor downwash, does not interfere with the imaging systems normal operations. Since the radiation-propagation-in-turbulence is a hardly predictable process, it was proposed a high-level approach in which, instead of studying the medium under turbulence, the turbulence effects on the imaging systems processing are assessed by means of an equivalent statistical model representation, allowing a definition of a Turbulence index to classify different level of turbulence intensities. Hence, a general measurement methodology for the degradation of the imaging systems performance in turbulence conditions was developed. The analysis of the performance degradation started by evaluating the effects of turbulences with a given index on the image processing chain (i.e., thresholding, blob analysis). The processing in turbulence (PIT) index is then derived by combining the effects of the given turbulence on the different image processing primitive functions. By evaluating the corresponding PIT index for a sufficient number of testing directions, it is possible to map the performance degradation around the aircraft installation for a generic imaging system, and to identify the best installation position for sensors/effectors composing the EO self-protection suite.
Power Supply Changes for NSTX Resistive Wall Mode Coils
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ramakrishnan, S S.
The National Spherical Torus Experiment (NSTX) has been designed and installed in the existing facilities at Princeton Plasma Physics Laboratory (PPPL). Most of the hardware, plant facilities, auxiliary sub-systems, and power systems originally used for the Tokamak Fusion Test Reactor (TFTR) have been used with suitable modifications to reflect NSTX needs. Prior to 2004, the NSTX power system was feeding twelve (12) circuits in the machine. In 2004 the Resistive Wall Mode (RWM) Coils were installed on the machine to correct error fields. There are six of these coils installed around the machine in the mid-plane. Since these coils needmore » fast and accurate controls, a Switching Power Amplifier (SPA) with three sub-units was procured, installed and commissioned along with other power loop components. Two RWM Coils were connected in series and fed from one SPA sub-unit. After the initial RWM campaign, operational requirements evolved such that each of the RWM coils now requires separate power and control. Hence a second SPA with three sub-units has been procured and installed. The second unit is of improved design and has the controls and power components completely isolated. The existing thyristor rectifier is used as DC Link to both of the Switching Power Amplifiers. The controls for the RWM are integrated into the overall computer control of the DC Power systems for NSTX. This paper describes the design changes in the RWM Power system for NSTX.« less
DOE/NREL supported wind energy activities in Alaska
DOE Office of Scientific and Technical Information (OSTI.GOV)
Drouilhet, S.
1997-12-01
This paper describes three wind energy projects implemented in Alaska. The first, a sustainable technology energy partnerships (STEP) wind energy deployment project in Kotzebue will install 6 AOC 15/50 wind turbines and connect to the existing village diesel grid, consisting of approximately 1 MW average load. It seeks to develop solutions to the problems of arctic wind energy installations (transport, foundations, erection, operation, and maintenance), to establish a wind turbine test site, and to establish the Kotzebue Electric Association as a training and deployment center for wind/diesel technology in rural Alaska. The second project, a large village medium-penetration wind/diesel system,more » also in Kotzebue, will install a 1-2 MW windfarm, which will supplement the AOC turbines of the STEP project. The program will investigate the impact of medium penetration wind energy on power quality and system stability. The third project, the Alaska high-penetration wind/diesel village power pilot project in Wales will install a high penetration (80-100%) wind/diesel system in a remote Alaskan village. The system will include about 180 kW installed wind capacity, meeting an average village load of about 60 kW. This program will provide a model for high penetration wind retrofits to village diesel power systems and build the capability in Alaska to operate, maintain, and replicate wind/diesel technology. The program will also address problems of: effective use of excess wind energy; reliable diesel-off operation; and the role of energy storage.« less
NASA Technical Reports Server (NTRS)
Bentley, Nicole L.; Brower, David V.; Le, Suy Q.; Seaman, Calvin H.; Tang, Henry H.
2017-01-01
This paper presents the design and development of a friction-based coupling device for a fiber-optic monitoring system capable of measuring pressure, strain, and temperature that can be deployed on existing subsea structures. A summary is provided of the design concept, prototype development, prototype performance testing, and subsequent design refinements of the device. The results of laboratory testing of the first prototype performed at the National Aeronautics and Space Administration (NASA) Johnson Space Center (JSC) are also included. Limitations of the initial concept were identified during testing and future design improvements were proposed and later implemented. These new features enhance the coupling of the sensor device and improve the monitoring system measurement capabilities. A major challenge of a post-installed instrumentation monitoring system is to ensure adequate coupling between the instruments and the structure of interest for reliable measurements. Friction-based devices have the potential to overcome coupling limitations caused by marine growth and soil contamination on flowlines, risers, and other subsea structures. The work described in this paper investigates the design and test of a friction-based coupling device (herein referred to as a friction clamp) which is suitable for pipelines and structures that are suspended in the water column as well as for those that are resting on the seabed. The monitoring elements consist of fiberoptic sensors that are bonded to a stainless steel clamshell assembly with a high-friction surface coating. The friction clamp incorporates a single hinge design to facilitate installation of the clamp and dual rows of opposing fasteners to distribute the clamping force along the structure. The friction clamp can be modified to be installed by commercial divers in shallow depths or by remotely operated vehicles in deep-water applications. NASA-JSC was involved in the selection and testing of the friction coating, and in the design and testing of the prototype clamp device. Four-inch diameter and eight-inch diameter sub-scale friction clamp prototypes were built and tested to evaluate the strain measuring capabilities of the design under different loading scenarios. The testing revealed some limitations of the initial design concept, and subsequent refinements were explored to improve the measurement performance of the system. This study was part of a collaboration between NASA-JSC and Astro Technology Inc. within a study called Clear Gulf. The primary objective of the Clear Gulf study is to develop advanced instrumentation technologies that will improve operational safety and reduce the risk of hydrocarbon spillage. NASA provided unique insights, expansive test facilities, and technical expertise to advance technologies that will benefit the environment, the public, and commercial industries.
Design and Integration of an Actuated Nose Strake Control System
NASA Technical Reports Server (NTRS)
Flick, Bradley C.; Thomson, Michael P.; Regenie, Victoria A.; Wichman, Keith D.; Pahle, Joseph W.; Earls, Michael R.
1996-01-01
Aircraft flight characteristics at high angles of attack can be improved by controlling vortices shed from the nose. These characteristics have been investigated with the integration of the actuated nose strakes for enhanced rolling (ANSER) control system into the NASA F-18 High Alpha Research Vehicle. Several hardware and software systems were developed to enable performance of the research goals. A strake interface box was developed to perform actuator control and failure detection outside the flight control computer. A three-mode ANSER control law was developed and installed in the Research Flight Control System. The thrust-vectoring mode does not command the strakes. The strakes and thrust-vectoring mode uses a combination of thrust vectoring and strakes for lateral- directional control, and strake mode uses strakes only for lateral-directional control. The system was integrated and tested in the Dryden Flight Research Center (DFRC) simulation for testing before installation in the aircraft. Performance of the ANSER system was monitored in real time during the 89-flight ANSER flight test program in the DFRC Mission Control Center. One discrepancy resulted in a set of research data not being obtained. The experiment was otherwise considered a success with the majority of the research objectives being met.
Parkes radio science system design and testing for Voyager Neptune encounter
NASA Technical Reports Server (NTRS)
Rebold, T. A.; Weese, J. F.
1989-01-01
The Radio Science System installed at Parkes, Australia for the Voyager Neptune encounter was specified to meet the same stringent requirements that were imposed upon the Deep Space Network Radio Science System. The system design and test methodology employed to meet these requirements at Parkes are described, and data showing the measured performance of the system are presented. The results indicate that the system operates with a comfortable margin on the requirements. There was a minor problem with frequency-dependent spurious signals which could not be fixed before the encounter. Test results characterizing these spurious signals are included.
Liu, Z; Stout, J E; Boldin, M; Rugh, J; Diven, W F; Yu, V L
1998-01-01
One copper-silver ionization system was sequentially installed onto the hot-water recirculation lines of two hospital buildings colonized with Legionella pneumophila, serogroup 1. A third building with the same water supply and also colonized with Legionella served as a control. Four weeks after activation of the system, distal site positivity for Legionella in the first test building dropped to zero. After operating for 16 weeks, the system was disconnected and installed onto the second test building. Twelve weeks of disinfection reduced the distal site positivity for Legionella in the second test building to zero. Legionella recolonization did not occur in the first test building for 6-12 weeks and in the second test building for 8-12 weeks after inactivation of the system. The control building remained Legionella-positive throughout the experimental period. A significantly higher copper concentration was found in the biofilm taken from a sampling device than in that from water. This is likely to be the reason that the copper-silver ionization system had the residual effect of preventing early recolonization. Our study raises the possibility that one copper-silver unit could be rotated among several buildings to maintain a Legionella-free environment. Such an approach may be cost-effective for buildings housing individuals at low risk for contracting legionnaires' disease.
33 CFR 157.12f - Workshop functional test requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
... CARRYING OIL IN BULK Design, Equipment, and Installation § 157.12f Workshop functional test requirements. (a) Each oil content meter and each control section of a monitoring system must be subjected to a... protocol must be received with each unit delivered. (b) A functional test conducted on an oil content meter...
33 CFR 157.12f - Workshop functional test requirements.
Code of Federal Regulations, 2014 CFR
2014-07-01
... CARRYING OIL IN BULK Design, Equipment, and Installation § 157.12f Workshop functional test requirements. (a) Each oil content meter and each control section of a monitoring system must be subjected to a... protocol must be received with each unit delivered. (b) A functional test conducted on an oil content meter...
33 CFR 157.12f - Workshop functional test requirements.
Code of Federal Regulations, 2012 CFR
2012-07-01
... CARRYING OIL IN BULK Design, Equipment, and Installation § 157.12f Workshop functional test requirements. (a) Each oil content meter and each control section of a monitoring system must be subjected to a... protocol must be received with each unit delivered. (b) A functional test conducted on an oil content meter...
14 CFR 29.1015 - Oil tank tests.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Oil tank tests. 29.1015 Section 29.1015... STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Powerplant Oil System § 29.1015 Oil tank tests. Each oil tank must be designed and installed so that— (a) It can withstand, without failure, any vibration, inertia, and...
WETS - Azura Half Scale Testing MOIS Documentation
Nelson, Eric
2015-05-30
This submission includes documentation on the Modular Ocean Instrumentation System (MOIS) installation on the Azura 1/2 scale wave energy converter at the Marine Station Kaneohe Bay (MCBH). Data from the deployment will be uploaded over the course of the test. The instrumentation and data come from the NREL team participating in this testing.
30 CFR 250.449 - What additional BOP testing requirements must I meet?
Code of Federal Regulations, 2011 CFR
2011-07-01
... ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Blowout Preventer (bop) System Requirements § 250.449 What... installation. You must use water to conduct this test. You may use drilling fluids to conduct subsequent tests...
Project SAGE: solar assisted gas energy. Final report and executive summary
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The Phase III basic objective was establishment of a technical and economic baseline for proper assessment of the practical potential of solar water heating for apartments. Plans can then be formulated to improve SAGE technical design and performance; reduce SAGE costs; refine SAGE market assessment; and identify policies to encourage the use of SAGE. Two SAGE water heating systems were installed and tested. One system was retrofit onto an existing apartment building; the other was installed in a new apartment building. Each installation required approximately 1000 square feet of collector area tilted to an angle of 37/sup 0/ from themore » horizontal, and each was designed to supply about 70 percent of the energy for heating water for approximately 32 to 40 units of a typical two-story apartment complex in Southern California. Actual contruction costs were carefully compiled, and both installations were equipped with performance monitoring equipment. In addition, the operating and maintenance requirements of each installation was evaluated by gas company maintenance engineers. Upon completion of the installation analysis, the SAGE installation cost was further refined by obtaining firm SAGE construction bids from two plumbing contractors in Southern California. Market penetration was assessed by developing a computer simulation program using the technical and economic analysis from the installation experience. Also, the project examined the public policies required to encourage SAGE and other solar energy options. Results are presented and discussed. (WHK)« less
2008-04-01
A full-scale flight-test mockup of the Constellation program's Orion crew vehicle arrived at NASA's Dryden Flight Research Center in late March 2008 to undergo preparations for the first short-range flight test of the spacecraft's astronaut escape system later that year. Engineers and technicians at NASA's Langley Research Center fabricated the structure, which precisely represents the size, outer shape and mass characteristics of the Orion space capsule. The Orion crew module mockup was ferried to NASA Dryden on an Air Force C-17. After painting in the Edwards Air Force Base paint hangar, the conical capsule was taken to Dryden for installation of flight computers, instrumentation and other electronics prior to being sent to the U.S. Army's White Sands Missile Range in New Mexico for integration with the escape system and the first abort flight test in late 2008. The tests were designed to ensure a safe, reliable method of escape for astronauts in case of an emergency.
Development Studies for a Novel Wet Oxidation Process
DOE Office of Scientific and Technical Information (OSTI.GOV)
Delphi Research
1999-09-30
DETOX is a catalyzed wet oxidation process that destroys organic materials in an acidic water solution of iron at 373 to 473 K. The solution can be used repeatedly to destroy great amounts of organic materials. Since the process is conducted in a contained vessel, air emissions from the process can be well controlled. The solution is also capable of dissolving and concentrating many heavy and radioactive metals for eventual stabilization and disposal. The Phase III effort for this project is fabrication, assembly, and installation of the DETOX demonstration unit, preparation of documentation and training to meet site requirements formore » operation, followed by system run-in and shakedown testing of the unit prior to demonstration testing. The Title III design was completed and the unit was fabricated according to standards set forth by OSHA, EPA, the American Petroleum Institute (i.e., chemical and petroleum industry standards), and the ASME B-313 Piping Code requirements as agreed to in preliminary design meetings with primary stakeholders. The unit was assembled in three modules and two trailers and then shipped to the TNX facility at the Savannah River Site in September and october of 1996. On-going site integration tasks were address while delays in installation arose due to funding sources and costs. In March of 1997, Delphi was authorized to proceed with the installation of the unit, making electrical and mechanical connections necessary to operate the unit. All installation tasks were completed in August of 1997. Results of an Operational Readiness Review conducted in August 1997 verified that Delphi's procedures and documentation met the necessary requirements to operate the unit at SRS. Completion of the final checklist of WSRC requirements was then addressed including the Owner's Independent Inspection Report, verifying all components of the unit met B-31.3 standards. Final hydraulic and pneumatic tests were completed in November to satisfy the B-31.3 requirement. During the month of December, the control system and heating and cooling systems were then prepared to initiate system startup and conduct the run-in tests. Shakedown tests were combined with the Phase IV tasks due to DOE funding constraints, i.e., tests formerly planned to be conducted with oil and solid materials were deferred to Phase IV and combined with similar testing. Once run-in testing has been completed, the primary objectives of Phase III will have been achieved and the project will be ready to proceed to demonstration testing (Phase IV).« less
Technology demonstration for reducing mercury emissions from small-scale gold refining facilities.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Habegger, L. J.; Fernandez, L. E.; Engle, M.
2008-06-30
Gold that is brought from artisanal and small-scale gold mining areas to gold shops for processing and sale typically contains 5-40% mercury. The uncontrolled removal of the residual mercury in gold shops by using high-temperature evaporation can be a significant source of mercury emissions in urban areas where the shops are located. Emissions from gold shop hoods during a burn can exceed 1,000 mg/m{sup 3}. Because the saturation concentration of mercury vapor at operating temperatures at the hood exhaust is less than 100 mg/m{sup 3}, the dominant component of the exhaust is in the form of aerosol or liquid particles.more » The U.S. Environmental Protection Agency (EPA), with technical support from Argonne National Laboratory (Argonne), has completed a project to design and test a technology to remove the dominant aerosol component in the emissions from gold shops. The objective was to demonstrate a technology that could be manufactured at low cost and by using locally available materials and manufacturing capabilities. Six prototypes designed by Argonne were locally manufactured, installed, and tested in gold shops in Itaituba and Creporizao, Brazil. The initial prototype design incorporated a pebble bed as the media for collecting the mercury aerosols, and a mercury collection efficiency of over 90% was demonstrated. Though achieving high efficiencies, the initial prototype was determined to have practical disadvantages such as excessive weight, a somewhat complex construction, and high costs (>US$1,000). To further simplify the construction, operation, and associated costs, a second prototype design was developed in which the pebble bed was replaced with slotted steel baffle plates. The system was designed to have flexibility for installation in various hood configurations. The second prototype with the baffle plate design was installed and tested in several different hood/exhaust systems to determine the optimal installation configuration. The significance of coagulation and collection of the mercury aerosols in exhaust ducts, which is dependent on the hood and collector configuration, was also evaluated. Prototype demonstration tests verified the theoretical basis for mercury aerosol capture that can be used to optimize the baffle plate design, flow rates, and hood exhaust ducts and plenum to achieve 80% or higher removal efficiencies. Results indicated that installation configuration significantly influences a system's capture efficiency. Configurations that retained existing inlet ducts resulted in system efficiencies of more than 80%, whereas installation configurations without inlet ducts significantly reduced capture efficiency. As an alternative to increasing the volume of inlet ducts, the number of baffle plates in the system baffle assembly could be doubled to increase efficiency. Recommended installation and operation procedures were developed on the basis of these results. A water-based mercury capture system developed in Indonesia for installation in smaller shops was also tested and shown to be effective for certain applications. The cost of construction and installation of the baffle plate prototype was approximately US$400. These costs were reported as acceptable by local gold shop owners and government regulators, and were significantly lower than the cost of an alternate charcoal/copper mesh mercury filter available in the region, which costs about US$10,000. A sampling procedure that consists of a particle filter combined with a vapor analyzer was demonstrated as an effective procedure for analyzing both the aerosol and vapor components of the mercury concentrations. Two key findings for enhancing higher mercury collection were identified. First, the aerosol/vapor mercury emissions must be given sufficient time for the mercury particles to coagulate to a size that can be readily captured by the baffle plates. An interval of at least 6 seconds of transit time between the point of evaporation and contact with the slotted baffle plates is recommended. Some particles will also deposit in the exhaust ducts between the point of evaporation and the baffle plates. Second, the slots in the baffle plates create jets that force the mercury particles to impinge and adhere on downstream surfaces. The baffle plates should closely follow the designs developed for this system to be most effective.« less
Cryogenic-Compatible Winchester Connector Mount and Retaining System for Composite Tubes
NASA Technical Reports Server (NTRS)
Pontius, James; McGuffey, Douglas
2011-01-01
A connector retainer and mounting system has been designed to replace screw-mounting of Winchester connectors. Countersunk screws are normally used to secure connectors to structures, and to keep them from coming apart. These screws are normally put into threaded or through-holes in metallic structures. This unique retainer is designed such that integral posts keep the connector halves retained, and a groove permits a cable tie to be fastened around the retainer and composite tube, thus securing the connector to the structure. The system is compatible for use on cryogenic (and conventional) bonded composite tube assemblies. Screws and tapped/through-holes needed to retain and mount Winchester connectors cannot be used on blind-access composite tubes. This system allows for rapid installation, removal, low-molecular-outgassing materials, and particulate-free installation and removal. Installation and/or changes late in the integration, and test flow with limited access in a cleanroom environment are possible. No sanding or bonding is needed.
49 CFR 236.108 - Insulation resistance tests, wires in trunking and cables.
Code of Federal Regulations, 2014 CFR
2014-10-01
... cables. 236.108 Section 236.108 Transportation Other Regulations Relating to Transportation (Continued... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES... Insulation resistance tests, wires in trunking and cables. (a) Insulation resistance of wires and cables...
49 CFR 236.108 - Insulation resistance tests, wires in trunking and cables.
Code of Federal Regulations, 2012 CFR
2012-10-01
... cables. 236.108 Section 236.108 Transportation Other Regulations Relating to Transportation (Continued... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES... Insulation resistance tests, wires in trunking and cables. (a) Insulation resistance of wires and cables...
49 CFR 236.108 - Insulation resistance tests, wires in trunking and cables.
Code of Federal Regulations, 2013 CFR
2013-10-01
... cables. 236.108 Section 236.108 Transportation Other Regulations Relating to Transportation (Continued... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES... Insulation resistance tests, wires in trunking and cables. (a) Insulation resistance of wires and cables...
NASA Astrophysics Data System (ADS)
1981-03-01
Support documentation for a second generation heliostat project is presented. Flowcharts of control software are included. Numerical and graphic test results are provided. Project management information is also provided.
76 FR 291 - Special Conditions: Gulfstream Model GVI Airplane; Single-Occupant Side-Facing Seats
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-04
...-occupant side-facing seat installations. Dynamic testing of all seats approved for occupancy during takeoff.... 25.562, ``Emergency landing dynamic conditions,'' requires dynamic testing of all seats occupied... seats, or seats equipped with conventional restraint systems. [[Page 292
A Navy Shore Activity Manpower Planning System for Civilians. Technical Report No. 24.
ERIC Educational Resources Information Center
Niehaus, R. J.; Sholtz, D.
This report describes the U.S. Navy Shore Activity Manpower Planning System (SAMPS) advanced development research project. This effort is aimed at large-scale feasibility tests of manpower models for large Naval installations. These local planning systems are integrated with Navy-wide information systems on a data-communications network accessible…
2014-11-01
thus increasing the likelihood of additional testing delays. For example, testing of the ship’s fire sprinklers was delayed because construction of...not deploy as scheduled or will deploy without fully tested systems . The Navy is implementing steps to achieve the $11.5 billion congressional cost...cap, by postponing installation of some systems until after ship delivery, and deferring an estimated $200 million - $250 million in previously
Warranties in Weapon System Procurement: An Analysis of Practice and Theory.
1987-04-01
MICROCOPY RESOLUTION TEST CHART NATIONAL BUREAU OF SIANDARDS 1963 A fD r ILE GW cm AD-A190 933 IDA PAPER P-2024 WARRANTIES IN WEAPON SYSTEM PROCUREMENT...EPWT Essential Performance Warranty Test FAR Federal Acquisition Regulation GCS Guidance Control Section GLD Ground Laser Locator Designator GS General...Service IDA Institute for Defense Analyses I&L Installations and Logistics IPT Initial Production Test LDR Laser Designator Rangefimder MLDT Mean
47 CFR 27.1180 - The cost-sharing formula.
Code of Federal Regulations, 2014 CFR
2014-10-01
... system with which it interferes is entitled to pro rata reimbursement based on the cost-sharing formula... system, and includes, but is not limited to, such items as: Radio terminal equipment (TX and/or RX...; monitoring or control equipment; engineering costs (design/path survey); installation; systems testing; FCC...
47 CFR 27.1180 - The cost-sharing formula.
Code of Federal Regulations, 2012 CFR
2012-10-01
...-sharing formula. (a) An AWS licensee that relocates a BRS system with which it interferes is entitled to... this section. (b) C is the actual cost of relocating the system, and includes, but is not limited to... (design/path survey); installation; systems testing; FCC filing costs; site acquisition and civil works...
47 CFR 27.1180 - The cost-sharing formula.
Code of Federal Regulations, 2013 CFR
2013-10-01
... § 27.1180 The cost-sharing formula. (a) An AWS licensee that relocates a BRS system with which it... forth in paragraph (b) of this section. (b) C is the actual cost of relocating the system, and includes... equipment; engineering costs (design/path survey); installation; systems testing; FCC filing costs; site...
47 CFR 27.1180 - The cost-sharing formula.
Code of Federal Regulations, 2011 CFR
2011-10-01
...-sharing formula. (a) An AWS licensee that relocates a BRS system with which it interferes is entitled to... this section. (b) C is the actual cost of relocating the system, and includes, but is not limited to... (design/path survey); installation; systems testing; FCC filing costs; site acquisition and civil works...
The 40-kw field test power plant modification and development, phase 2
NASA Technical Reports Server (NTRS)
1980-01-01
Progression on the design and development of a 40 KW fuel cell system for on-site installation for providing both thermal and electrical power is reported. Development of the steam reformer fuel processor, power section, inverter, control system, and thermal management and water treatment systems is described.
Solar heating system installed at Telex Communications, Inc., Blue Earth, Minnesota
NASA Technical Reports Server (NTRS)
1977-01-01
The solar heating system for space heating a 97,000 square foot building which houses administrative offices, assembly areas, and warehouse space is summarized. Information on system description, test data, major problems and resolutions, performance, operation and maintenance manual, manufacturer's literature, and as-built drawings is presented.
NASA Astrophysics Data System (ADS)
Clements, Jim; Robinson, Richard; Bunt, Leslie; Robinson, Joe
2011-06-01
A number of techniques have been utilized to evaluate the performance of Aircraft Survivability Equipment (ASE) against threat Man-Portable Air Defense Systems (MANPADS). These techniques include flying actual threat MANPADS against stationary ASE with simulated aircraft signatures, testing installed ASE systems against simulated threat signatures, and laboratory hardware-in-the-loop (HWIL) testing with simulated aircraft and simulated missile signatures. All of these tests lack the realism of evaluating installed ASE against in-flight MANPADS on a terminal homing intercept path toward the actual ASE equipped aircraft. This limitation is due primarily to the current inability to perform non-destructive MANPADS/Aircraft flight testing. The U.S. Army Aviation and Missile Research and Development and Engineering Center (AMRDEC) is working to overcome this limitation with the development of a recoverable surrogate MANPADS missile system capable of engaging aircraft equipped with ASE while guaranteeing collision avoidance with the test aircraft. Under its Missile Airframe Simulation Testbed - MANPADS (MAST-M) program, the AMRDEC is developing a surrogate missile system which will utilize actual threat MANPADS seeker/guidance sections to control the flight of a surrogate missile which will perform a collision avoidance and recovery maneuver prior to intercept to insure non-destructive test and evaluation of the ASE and reuse of the MANPADS seeker/guidance section. The remainder of this paper provides an overview of this development program and intended use.
NASA Technical Reports Server (NTRS)
Pryor, D.; Hyde, E. H.; Escher, W. J. D.
1999-01-01
Airbreathing/Rocket combined-cycle, and specifically rocket-based combined- cycle (RBCC), propulsion systems, typically employ an internal engine flow-path installed primary rocket subsystem. To achieve acceptably short mixing lengths in effecting the "air augmentation" process, a large rocket-exhaust/air interfacial mixing surface is needed. This leads, in some engine design concepts, to a "cluster" of small rocket units, suitably arrayed in the flowpath. To support an early (1964) subscale ground-test of a specific RBCC concept, such a 12-rocket cluster was developed by NASA's Marshall Space Flight Center (MSFC). The small primary rockets used in the cluster assembly were modified versions of an existing small kerosene/oxygen water-cooled rocket engine unit routinely tested at MSFC. Following individual thrust-chamber tests and overall subsystem qualification testing, the cluster assembly was installed at the U. S. Air Force's Arnold Engineering Development Center (AEDC) for RBCC systems testing. (The results of the special air-augmented rocket testing are not covered here.) While this project was eventually successfully completed, a number of hardware integration problems were met, leading to catastrophic thrust chamber failures. The principal "lessons learned" in conducting this early primary rocket subsystem experimental effort are documented here as a basic knowledge-base contribution for the benefit of today's RBCC research and development community.
On-line remote monitoring of radioactive waste repositories
NASA Astrophysics Data System (ADS)
Calì, Claudio; Cosentino, Luigi; Litrico, Pietro; Pappalardo, Alfio; Scirè, Carlotta; Scirè, Sergio; Vecchio, Gianfranco; Finocchiaro, Paolo; Alfieri, Severino; Mariani, Annamaria
2014-12-01
A low-cost array of modular sensors for online monitoring of radioactive waste was developed at INFN-LNS. We implemented a new kind of gamma counter, based on Silicon PhotoMultipliers and scintillating fibers, that behaves like a cheap scintillating Geiger-Muller counter. It can be placed in shape of a fine grid around each single waste drum in a repository. Front-end electronics and an FPGA-based counting system were developed to handle the field data, also implementing data transmission, a graphical user interface and a data storage system. A test of four sensors in a real radwaste storage site was performed with promising results. Following the tests an agreement was signed between INFN and Sogin for the joint development and installation of a prototype DMNR (Detector Mesh for Nuclear Repository) system inside the Garigliano radwaste repository in Sessa Aurunca (CE, Italy). Such a development is currently under way, with the installation foreseen within 2014.
30 CFR 250.800 - General requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
..., installed, used, maintained, and tested in a manner to assure the safety and protection of the human, marine, and coastal environments. Production safety systems operated in subfreezing climates shall utilize...
NASA Astrophysics Data System (ADS)
Serio, L.; Bremer, J.; Claudet, S.; Delikaris, D.; Ferlin, G.; Ferrand, F.; Pezzetti, M.; Pirotte, O.
2017-12-01
CERN operates and maintains the world largest cryogenic infrastructure ranging from ageing but well maintained installations feeding detectors, test facilities and general services, to the state-of-the-art cryogenic system serving the flagship LHC machine complex. A study was conducted and a methodology proposed to outsource to industry the operation and maintenance of the whole cryogenic infrastructure. The cryogenic installations coupled to non LHC-detectors, test facilities and general services infrastructure have been fully outsourced for operation and maintenance on the basis of performance obligations. The contractor is responsible for the operational performance of the installations based on a yearly operation schedule provided by CERN. The maintenance of the cryogenic system serving the LHC machine and its detectors has been outsourced on the basis of tasks oriented obligations, monitored by key performance indicators. CERN operation team, with the support of the contractor operation team, remains responsible for the operational strategy and performances. We report the analysis, strategy, definition of the requirements and technical specifications as well as the achieved technical and economic performances after one year of operation.
Some preliminary results from the NWTC direct-drive, variable-speed test bed
DOE Office of Scientific and Technical Information (OSTI.GOV)
Carlin, P.W.; Fingersh, L.J.
1996-10-01
With the remarkable rise in interest in variable-speed operation of larger wind turbines, it has become important for the National Wind Technology Center (NWTC) to have access to a variable-speed test bed that can be specially instrumented for research. Accordingly, a three-bladed, 10-meter, downwind, Grumman Windstream machine has been equipped with a set of composite blades and a direct-coupled, permanent-magnet, 20 kilowatt generator. This machine and its associated control system and data collection system are discussed. Several variations of a maximum power control algorithm have been installed on the control computer. To provide a baseline for comparison, several constant speedmore » algorithms have also been installed. The present major effort is devoted to daytime, semi-autonomous data collection.« less
2003-11-04
VANDENBERG AFB, CALIF. - In the NASA spacecraft processing facility on North Vandenberg Air Force Base, a balloon gently lifts the solar array panel to be installed on the Gravity Probe B spacecraft. Installing each array is a 3-day process and includes a functional deployment test. The Gravity Probe B mission is a relativity experiment developed by NASA’s Marshall Space Flight Center, Stanford University and Lockheed Martin. The spacecraft will test two extraordinary predictions of Albert Einstein’s general theory of relativity that he advanced in 1916: the geodetic effect (how space and time are warped by the presence of the Earth) and frame dragging (how Earth’s rotation drags space and time around with it). Gravity Probe B consists of four sophisticated gyroscopes that will provide an almost perfect space-time reference system. The mission will look in a precision manner for tiny changes in the direction of spin.
2003-11-04
VANDENBERG AFB, CALIF. - In the NASA spacecraft processing facility on North Vandenberg Air Force Base, the Gravity Probe B spacecraft is seen with all four solar array panels installed. Installing each array is a 3-day process and includes a functional deployment test. The Gravity Probe B mission is a relativity experiment developed by NASA’s Marshall Space Flight Center, Stanford University and Lockheed Martin. The spacecraft will test two extraordinary predictions of Albert Einstein’s general theory of relativity that he advanced in 1916: the geodetic effect (how space and time are warped by the presence of the Earth) and frame dragging (how Earth’s rotation drags space and time around with it). Gravity Probe B consists of four sophisticated gyroscopes that will provide an almost perfect space-time reference system. The mission will look in a precision manner for tiny changes in the direction of spin.
2003-11-03
VANDENBERG AFB, CALIF. - A worker in the NASA spacecraft processing facility on North Vandenberg Air Force Base adjust the supports on a solar array panel to be lifted and installed on the Gravity Probe B spacecraft. Installing each array is a 3-day process and includes a functional deployment test. The Gravity Probe B mission is a relativity experiment developed by NASA’s Marshall Space Flight Center, Stanford University and Lockheed Martin. The spacecraft will test two extraordinary predictions of Albert Einstein’s general theory of relativity that he advanced in 1916: the geodetic effect (how space and time are warped by the presence of the Earth) and frame dragging (how Earth’s rotation drags space and time around with it). Gravity Probe B consists of four sophisticated gyroscopes that will provide an almost perfect space-time reference system. The mission will look in a precision manner for tiny changes in the direction of spin.
2003-11-04
VANDENBERG AFB, CALIF. - In the NASA spacecraft processing facility on North Vandenberg Air Force Base, the Gravity Probe B spacecraft is seen with two solar array panels installed. Installing each array is a 3-day process and includes a functional deployment test. The Gravity Probe B mission is a relativity experiment developed by NASA’s Marshall Space Flight Center, Stanford University and Lockheed Martin. The spacecraft will test two extraordinary predictions of Albert Einstein’s general theory of relativity that he advanced in 1916: the geodetic effect (how space and time are warped by the presence of the Earth) and frame dragging (how Earth’s rotation drags space and time around with it). Gravity Probe B consists of four sophisticated gyroscopes that will provide an almost perfect space-time reference system. The mission will look in a precision manner for tiny changes in the direction of spin.
2003-11-04
VANDENBERG AFB, CALIF. - In the NASA spacecraft processing facility on North Vandenberg Air Force Base, a worker checks the installation of a solar array panel onto the Gravity Probe B spacecraft. Installing each array is a 3-day process and includes a functional deployment test. The Gravity Probe B mission is a relativity experiment developed by NASA’s Marshall Space Flight Center, Stanford University and Lockheed Martin. The spacecraft will test two extraordinary predictions of Albert Einstein’s general theory of relativity that he advanced in 1916: the geodetic effect (how space and time are warped by the presence of the Earth) and frame dragging (how Earth’s rotation drags space and time around with it). Gravity Probe B consists of four sophisticated gyroscopes that will provide an almost perfect space-time reference system. The mission will look in a precision manner for tiny changes in the direction of spin.
2003-11-03
VANDENBERG AFB, CALIF. - Workers in the NASA spacecraft processing facility on North Vandenberg Air Force Base prepare for the installation of solar array panel 3 on the Gravity Probe B spacecraft. Installing each array is a 3-day process and includes a functional deployment test. The Gravity Probe B mission is a relativity experiment developed by NASA’s Marshall Space Flight Center, Stanford University and Lockheed Martin. The spacecraft will test two extraordinary predictions of Albert Einstein’s general theory of relativity that he advanced in 1916: the geodetic effect (how space and time are warped by the presence of the Earth) and frame dragging (how Earth’s rotation drags space and time around with it). Gravity Probe B consists of four sophisticated gyroscopes that will provide an almost perfect space-time reference system. The mission will look in a precision manner for tiny changes in the direction of spin.
2003-11-03
VANDENBERG AFB, CALIF. - Workers in the NASA spacecraft processing facility on North Vandenberg Air Force Base prepare to rotate the framework containing one of four solar panels to be installed on the Gravity Probe B spacecraft. Installing each array is a 3-day process and includes a functional deployment test. The Gravity Probe B mission is a relativity experiment developed by NASA’s Marshall Space Flight Center, Stanford University and Lockheed Martin. The spacecraft will test two extraordinary predictions of Albert Einstein’s general theory of relativity that he advanced in 1916: the geodetic effect (how space and time are warped by the presence of the Earth) and frame dragging (how Earth’s rotation drags space and time around with it). Gravity Probe B consists of four sophisticated gyroscopes that will provide an almost perfect space-time reference system. The mission will look in a precision manner for tiny changes in the direction of spin.
2003-11-03
VANDENBERG AFB, CALIF. - Workers in the NASA spacecraft processing facility on North Vandenberg Air Force Base work on a solar array panel to be installed on the Gravity Probe B spacecraft. Installing each array is a 3-day process and includes a functional deployment test. The Gravity Probe B mission is a relativity experiment developed by NASA’s Marshall Space Flight Center, Stanford University and Lockheed Martin. The spacecraft will test two extraordinary predictions of Albert Einstein’s general theory of relativity that he advanced in 1916: the geodetic effect (how space and time are warped by the presence of the Earth) and frame dragging (how Earth’s rotation drags space and time around with it). Gravity Probe B consists of four sophisticated gyroscopes that will provide an almost perfect space-time reference system. The mission will look in a precision manner for tiny changes in the direction of spin.
2003-11-03
VANDENBERG AFB, CALIF. - Workers in the NASA spacecraft processing facility on North Vandenberg Air Force Base attach supports to a solar array panel to be lifted and installed on the Gravity Probe B spacecraft. Installing each array is a 3-day process and includes a functional deployment test. The Gravity Probe B mission is a relativity experiment developed by NASA’s Marshall Space Flight Center, Stanford University and Lockheed Martin. The spacecraft will test two extraordinary predictions of Albert Einstein’s general theory of relativity that he advanced in 1916: the geodetic effect (how space and time are warped by the presence of the Earth) and frame dragging (how Earth’s rotation drags space and time around with it). Gravity Probe B consists of four sophisticated gyroscopes that will provide an almost perfect space-time reference system. The mission will look in a precision manner for tiny changes in the direction of spin.
49 CFR 236.1043 - Task analysis and basic requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Positive Train Control Systems § 236.1043 Task analysis and basic requirements. (a) Training structure and... installation, maintenance, repair, modification, inspection, testing, and operating tasks that must be...
49 CFR 236.1043 - Task analysis and basic requirements.
Code of Federal Regulations, 2013 CFR
2013-10-01
..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Positive Train Control Systems § 236.1043 Task analysis and basic requirements. (a) Training structure and... installation, maintenance, repair, modification, inspection, testing, and operating tasks that must be...
49 CFR 236.1043 - Task analysis and basic requirements.
Code of Federal Regulations, 2014 CFR
2014-10-01
..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Positive Train Control Systems § 236.1043 Task analysis and basic requirements. (a) Training structure and... installation, maintenance, repair, modification, inspection, testing, and operating tasks that must be...
49 CFR 236.1043 - Task analysis and basic requirements.
Code of Federal Regulations, 2012 CFR
2012-10-01
..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Positive Train Control Systems § 236.1043 Task analysis and basic requirements. (a) Training structure and... installation, maintenance, repair, modification, inspection, testing, and operating tasks that must be...
49 CFR 236.1043 - Task analysis and basic requirements.
Code of Federal Regulations, 2011 CFR
2011-10-01
..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Positive Train Control Systems § 236.1043 Task analysis and basic requirements. (a) Training structure and... installation, maintenance, repair, modification, inspection, testing, and operating tasks that must be...
Permafrost Ecosystem Warming Prototype: Installation, Operation, and Initial Site Characterization
2013-11-01
report Approved for public release; distribution is unlimited. Prepared for US Army Corps of Engineers Washington , DC 20314-1000 Monitored by...in 3 m diameter plots in a temperate deciduous forest. To further develop the prototype for an arctic climate, a similar test system was installed...growth trees and shrubs. The site was chosen because of its permafrost characteristics, ease of access, and its close proximity to the CRREL Fairbanks
Information Management for Installation Restoration with Focus on Aberdeen Proving Ground, Maryland
1993-08-01
savings. Edgewood Area Project Background EA has been the site of extensive military munitions testing and disposal for over 70 years. Onsite burial of...titled "Installation Restoration Data Manage- ment Information System" (IRDMIS). This program, begun in 1975, has undergone several updates as technology ...collocated with AEC on EA, Maryland. Data from geotechnical chemical analysis and field survey results are supplied by AEC-authorized contractors and
Commercialization of Medium Voltage HTS Triax TM Cable Systems
DOE Office of Scientific and Technical Information (OSTI.GOV)
Knoll, David
2012-12-31
The original project scope that was established in 2007 aimed to install a 1,700 meter (1.1 mile) medium voltage HTS Triax{TM} cable system into the utility grid in New Orleans, LA. In 2010, however, the utility partner withdrew from the project, so the 1,700 meter cable installation was cancelled and the scope of work was reduced. The work then concentrated on the specific barriers to commercialization of HTS cable technology. The modified scope included long-length HTS cable design and testing, high voltage factory test development, optimized cooling system development, and HTS cable life-cycle analysis. In 2012, Southwire again analyzed themore » market for HTS cables and deemed the near term market acceptance to be low. The scope of work was further reduced to the completion of tasks already started and to testing of the existing HTS cable system in Columbus, OH. The work completed under the project included: • Long-length cable modeling and analysis • HTS wire evaluation and testing • Cable testing for AC losses • Optimized cooling system design • Life cycle testing of the HTS cable in Columbus, OH • Project management. The 200 meter long HTS Triax{TM} cable in Columbus, OH was incorporated into the project under the initial scope changes as a test bed for life cycle testing as well as the site for an optimized HTS cable cooling system. The Columbus cable utilizes the HTS TriaxTM design, so it provided an economical tool for these of the project tasks.« less
NASA Technical Reports Server (NTRS)
Kuebert, E. J.
1977-01-01
A Laser Altimeter and Mapping Camera System was included in the Apollo Lunar Orbital Experiment Missions. The backup system, never used in the Apollo Program, is available for use in the Lidar Test Experiments on the STS Orbital Flight Tests 2 and 4. Studies were performed to assess the problem associated with installation and operation of the Mapping Camera System in the STS. They were conducted on the photographic capabilities of the Mapping Camera System, its mechanical and electrical interface with the STS, documentation, operation and survivability in the expected environments, ground support equipment, test and field support.
1995-03-24
Outlined with gold stripes are the hinged nose strakes, modifications made to NASA's F-18 HARV (High Alpha Research Vehicle) at the Dryden Flight Research Center, Edwards, California. Actuated Nose Strakes for Enhanced Rolling (ANSER) were installed to fly the third and final phase in the HARV flight test project. Normally folded flush, the units -- four feet long and six inches wide -- can be opened independently to interact with the nose vortices to produce large side forces for control. Early wind tunnel tests indicated that the strakes would be as effective in yaw control at high angles of attack as rudders are at lower angles. Testing involved evaluation of the strakes by themselves as well as combined with the aircraft's Thrust Vectoring System. The strakes were designed by NASA's Langley Research Center, then installed and flight tested at Dryden.
10 CFR 431.242 - Test Procedures [Reserved
Code of Federal Regulations, 2011 CFR
2011-01-01
... upstream of the draft control device of an individual, automatically operated, fossil fuel-fired appliance... intended for installation in the venting system of an individual, automatically operated, fossil fuel-fired...
10 CFR 431.242 - Test Procedures [Reserved
Code of Federal Regulations, 2010 CFR
2010-01-01
... upstream of the draft control device of an individual, automatically operated, fossil fuel-fired appliance... intended for installation in the venting system of an individual, automatically operated, fossil fuel-fired...
2000-11-18
KENNEDY SPACE CENTER, FLA. -- STS-98 Mission Specialist Marsha Ivins takes a topsy-turvy look at the EVA hatch in the Orbiter Docking System, which is already installed in the payload bay of orbiter Atlantis. She and the rest of the crew are at KSC for Crew Equipment Interface Test activities. Launch on mission STS-98 is scheduled for Jan. 18, 2001. It will be transporting the U.S. Lab, Destiny, to the International Space Station with five system racks already installed inside of the module. After delivery of electronics in the lab, electrically powered attitude control for Control Moment Gyroscopes will be activated
2000-11-18
KENNEDY SPACE CENTER, FLA. -- STS-98 Mission Specialist Marsha Ivins takes a topsy-turvy look at the EVA hatch in the Orbiter Docking System, which is already installed in the payload bay of orbiter Atlantis. She and the rest of the crew are at KSC for Crew Equipment Interface Test activities. Launch on mission STS-98 is scheduled for Jan. 18, 2001. It will be transporting the U.S. Lab, Destiny, to the International Space Station with five system racks already installed inside of the module. After delivery of electronics in the lab, electrically powered attitude control for Control Moment Gyroscopes will be activated
Deep ocean corrosion research in support of Oman India gas pipeline
DOE Office of Scientific and Technical Information (OSTI.GOV)
Graham, F.W.; McKeehan, D.S.
1995-12-01
The increasing interest in deepwater exploration and production has motivated the development of technologies required to accomplish tasks heretofore possible only onshore and in shallow water. The tremendous expense of technology development and the cost of specialized equipment has created concerns that the design life of these facilities may be compromised by corrosion. The requirements to develop and prove design parameters to meet these demands will require an ongoing environmental testing and materials evaluation and development program. This paper describes a two-fold corrosion testing program involving: (1) the installation of two corrosion test devices installed in-situ, and (2) a laboratorymore » test conducted in simulated site-specific seawater. These tests are expected to qualify key parameters necessary to design a cathodic protection system to protect the Oman-to-India pipeline.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Siegel, A.I.; Bartter, W.D.; Kopstein, F.F.
1982-06-01
The task list method of job survey was used. In collaboration with BWR and PWR personnel, a list of 107 tasks performed by maintenance mechanics was developed, grouped into: remove and install, test and repair, inspect and perform preventive maintenance, miscellaneous, communication, and report preparation. For each listed task, the questionnaire form inquired into: frequency of performance, task completion time, safety consequences of improper performance, and the amount of training required to perform the task proficiently. Scaled information was requested about seven abilities: (1) visual speed, accuracy, and recognition; (2) gross motor coordination; (3) fine manual dexterity; (4) strength andmore » stamina; (5) cognition; (6) memory; and (7) problem solving required for function completion. Survey forms were distributed to 27 nuclear power plants. Thirty-one maintenance mechanics representing 17 plants returned the completed forms. Frequency of performing tasks was bimodally distributed: (1) between once a year and once every six months, and (2) about once a week. More than half of the tasks have potential risk consequences if improperly performed. The five tasks with the greatest risk implications in the case of inadequate performance were: (1) remove and install reactor and dry-well heads, (2) test and repair reactor system components, (3) remove and install pressurizer mechanical relief valves, (4) test and repair pressurizer relief valves, (5) remove and install core spray pumps, seals, and valves. Hierarchically, the public risk associated with the various functions was: (1) remove and install, (2) test and repair, (3) preventive maintenance, (4) miscellaneous tasks, (5) communication, and (6) report preparation.« less
Initial results from the Lick Observatory Laser Guide Star Adaptive Optics System
DOE Office of Scientific and Technical Information (OSTI.GOV)
Olivier, S.S.; An, J.; Avicola, K.
1995-11-08
A prototype adaptive optics system has been installed and tested on the 3 m Shane telescope at Lick Observatory. The adaptive optics system performance, using bright natural guide stars, is consistent with expectations based on theory. A sodium-layer laser guide star system has also been installed and tested on the Shane telescope. Operating at 15 W, the laser system produces a 9th magnitude guide star with seeing-limited size at 589 nm. Using the laser guide star, the adaptive optics system has reduced the wavefront phase variance on scales above 50 cm by a factor of 4. These results represent themore » first continuous wavefront phase correction using a sodium-layer laser guide star. Assuming tip-tilt is removed using a natural guide star, the measured control loop performance should produce images with a Strehl ratio of 0.4 at 2.2 {mu}m in 1 arc second seeing. Additional calibration procedures must be implemented in order to achieve these results with the prototype Lick adaptive optics system.« less
Hydraulic tests with direct-push equipment
Butler, J.J.; Healey, J.M.; McCall, G.W.; Garnett, E.J.; Loheide, Steven P.
2002-01-01
The potential of direct-push technology for hydraulic characterization of saturated flow systems was investigated at a field site with a considerable degree of subsurface control. Direct-push installations were emplaced by attaching short lengths of screen (shielded and unshielded) to the bottom end of a tool string that was then advanced into the unconsolidated sediments. A series of constant-rate pumping tests were performed in a coarse sand and gravel aquifer using direct-push tool strings as observation wells. Very good agreement (within 4%) was found between hydraulic conductivity (K) estimates from direct-push installations and those from conventional wells. A program of slug tests was performed in direct-push installations using small-diameter adaptations of solid-slug and pneumatic methods. In a sandy silt interval of moderate hydraulic conductivity, K values from tests in a shielded screen tool were in excellent agreement (within 2%) with those from tests in a nearby well. In the coarse sand and gravel aquifer, K values were within 12% of those from multilevel slug tests at a nearby well. However, in the more permeable portions of the aquifer (K > 70 m/day), the smaller-diameter direct-push rods (0.016 m inner diameter [I.D.]) attenuated test responses, leading to an underprediction of K. In those conditions, use of larger-diameter rods (e.g., 0.038 m I.D.) is necessary to obtain K values representative of the formation. This investigation demonstrates that much valuable information can be obtained from hydraulic tests in direct-push installations. As with any type of hydraulic test, K estimates are critically dependent on use of appropriate emplacement and development procedures. In particular, driving an unshielded screen through a heterogeneous sequence will often lead to a buildup of low-K material that can be difficult to remove with standard development procedures.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gusakovskii, K. B.; Zmaznov, E. Yu.; Katantsev, S. V.
The experience in the installation of modern digital systems for controlling converter units at the Vyborg converter substation on the basis of advanced microprocessor devices is considered. It is shown that debugging of a control and protection system on mathematical and physical models does not guarantee optimum control of actual converter devices. Examples of advancing the control and protection system are described, the necessity for which has become obvious in tests of actual equipment. Comparison of oscillograms of processes before optimization of the control system and after its optimization and adjustment shows that the digital control system makes it possiblemore » to improve substantially the algorithms of control and protection in the short term and without changing the hardware component.« less
Status review and prospects for solar industrial process heat (SIPH)
NASA Astrophysics Data System (ADS)
Kreith, F.; Davenport, R.; Feustel, J.
1983-11-01
Solar energy systems and components are presently available for industrial process hot air, hot water, and steam applications at temperatures up to about 300 C. Systems capable of operating at temperatures up to about 1000 C are approaching commercialization. A careful matching of the characteristics of the solar system and the industrial process in question has been found by field tests to be an important determinant of the amount of useful energy that can be delivered. While the thermal performance of solar collectors is not expected to improve significantly, better manufacturing, plumbing, and installation techniques may reduce both system and delivered energy costs significantly. Tax credits for solar installations, together with limited partnership financing, can offset the high initial cost of solar energy systems and provide equity between solar and fossil-fueled systems.
2009-06-10
CAPE CANAVERAL, Fla. – Workers at NASA's Kennedy Space Center in Florida secure a new window on the Firing Room in the Launch Control Center. New, hurricane-rated window systems for the four Firing Rooms and the vestibule areas between Firing Rooms 1 & 2 and Firing Rooms 3 & 4 are being installed. In order to avoid operational impacts the new windows are being installed on the outside of the existing windows, enclosing the space formerly occupied by the louvers. The old windows will remain in place until the new windows are completely installed and leak tested. This approach will continue to keep the firing rooms from being exposed to the elements. Photo credit: NASA/Jack Pfaller
Design and implementation of a 38 kW dish-Stirling concentrated solar power system
NASA Astrophysics Data System (ADS)
Yan, J.; Peng, Y. D.; Cheng, Z. R.; Liu, F. M.; Tang, X. H.
2017-11-01
Dish-Stirling concentrated solar power system (DS-CSP) is an important pathway for converting solar energy into electricity at high efficiency. In this study, a rated power 38 kW DS-CSP system was developed (installed in Xiangtan Electric Manufacturing Group). The heat engine adopted the alpha-type four cylinders double-acting Stirling engine (Stirling Biopower Flexgen S260). The absorber flux distribution simulation was conducted using ray tracing method and then the 204 m2 parabolic dish concentrator system (diameter is 17.70 m and focal length is 9.49 m) with single concentrator plus single pillar supporting has been designed and built. A water-cooled disc target and an absorber imitation device were adopted to test the tracking performance of the dish concentrator system, homogeneity of the focal spot and flux distribution of the absorber. Finally, the S260 Stirling engine was installed on the focal position of the dish concentrator and then the net output power date of the 38 kW DS-CSP system was tested. The absorber overheating problem on the DS-CSP system performance was discussed when the DS-CSP system was installed in different locations. The testing result shows that this system achieved the net output power of 38 kW and solar-to-electricity efficiency (SEE) of 25.3% with the direct normal irradiation (DNI) at 750 W/m2. The net output power can further increase to 40.5 kW with the SEE of 26.6% when the DNI reaches up to the maximum of 761 W/m2. The net output power of the 38 kW DS-CSP system has a linear function relationship with the DNI. The fitting function is Net power output=0.1003×DNI-36.129, where DNI is at the range of 460∼761 W/m2. This function could be used to predict the amount of the 38 kW DS-CSP system annual generation power.
Parris Island Wastewater Treatment Plant SCADA Upgrades Final Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Meador, Richard J.; Hatley, Darrel D.
2004-03-18
Marine Corp Recruit Depot (MCRD), Parris Island, SC, home of the Easter Recruiting Region Marine Corp Boot Camp, found itself in a situation common to Department of Defense (DOD) facilities. It had to deal with several different types of installed energy-related control systems that could not talk to each other. This situation was being exacerbated by the installation of a new and/or unique type of control system for every new building being constructed or older facility that was being upgraded. The Wastewater Treatment Facility (WWTF) and lift station controls were badly in need of a thorough inspection and a newmore » Supervisory Control and Data Acquisition (SCADA) system upgrade to meet environmental, safety, manpower, and maintenance concerns. A project was recently completed to implement such a wastewater treatment SCADA upgrade, which is compatible with other upgrades to the energy monitoring and control systems for Parris Island buildings and the Pacific Northwest National Laboratory (PNNL) Decision Support for Operations and Maintenance (DSOM) system installed at the Central Energy Plant (CEP). This project included design, specification, procurement, installation, and testing an upgraded SCADA alarm, process monitoring, and display system; and training WWTF operators in its operation. The ultimate goal of this and the other PNNL projects at Parris Island is to allow monitoring and control of energy and environmental components from a central location.« less
A central microprocessor controlled electrical storage heating system
NASA Astrophysics Data System (ADS)
Horstmann, H.
1980-12-01
The use of a microprocessor to control the reloading of electrical storage heaters not only during the night, but whenever the electrical grid is cycled down, was tested. The test setup, used to control a total of about 10 MW installed storage heating in 96 dwellings, is described. It is demonstrated that additional consumers can be connected to the system without demand for more power stations.
NASA Technical Reports Server (NTRS)
Kegley, Jeffrey; Haight, Harlan; Hogue, William; Carpenter, Jay; Siler, Richard; Wright, Ernie; Eng, Ron; Baker, Mark; McCracken, Jeff
2005-01-01
Marshall Space Flight Center's X-ray & Cryogenic Test Facility (XRCF) has been performing optical wavefront testing and thermal structural deformation testing at subliquid nitrogen cryogenic temperatures since 1999. Recent modifications have been made to the facility in support of the James Webb Space Telescope (JWST) program. The test article envelope and the chamber's refrigeration capacity have both been increased. A new larger helium-cooled enclosure has been added to the existing enclosure increasing both the cross-sectional area and the length. This new enclosure is capable of supporting six JWST Primary Mirror Segment Assemblies. A second helium refrigeration system has been installed essentially doubling the cooling capacity available at the facility. Modifications have also been made to the optical instrumentation area. Improved access is now available for both the installation and operation of optical instrumentation outside the vacuum chamber. Chamber configuration, specifications, and performance data will be presented.
14 CFR 27.1015 - Oil tank tests.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Oil tank tests. 27.1015 Section 27.1015... STANDARDS: NORMAL CATEGORY ROTORCRAFT Powerplant Oil System § 27.1015 Oil tank tests. Each oil tank must be... that each pressurized oil tank used with a turbine engine must be designed and installed so that it can...
14 CFR 27.1015 - Oil tank tests.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Oil tank tests. 27.1015 Section 27.1015... STANDARDS: NORMAL CATEGORY ROTORCRAFT Powerplant Oil System § 27.1015 Oil tank tests. Each oil tank must be... that each pressurized oil tank used with a turbine engine must be designed and installed so that it can...
14 CFR 27.1015 - Oil tank tests.
Code of Federal Regulations, 2014 CFR
2014-01-01
... that each pressurized oil tank used with a turbine engine must be designed and installed so that it can... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Oil tank tests. 27.1015 Section 27.1015... STANDARDS: NORMAL CATEGORY ROTORCRAFT Powerplant Oil System § 27.1015 Oil tank tests. Each oil tank must be...
1964-09-19
XV-5A airplane installed in 40x80ft Subsonic Wind Tunnel at NASA Ames Research Center with Tom Mills. The propulsive lift system was tested to determine power-on performance characteristics in preparation for flight tests. Used in Memoiors of an Aeronautical Engineer, Flight Tests at Ames Research Center 1940-1970 NASA-SP-2002-4526 (Seth B. Anderson)
14 CFR 27.1015 - Oil tank tests.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Oil tank tests. 27.1015 Section 27.1015... STANDARDS: NORMAL CATEGORY ROTORCRAFT Powerplant Oil System § 27.1015 Oil tank tests. Each oil tank must be... that each pressurized oil tank used with a turbine engine must be designed and installed so that it can...
14 CFR 27.1015 - Oil tank tests.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Oil tank tests. 27.1015 Section 27.1015... STANDARDS: NORMAL CATEGORY ROTORCRAFT Powerplant Oil System § 27.1015 Oil tank tests. Each oil tank must be... that each pressurized oil tank used with a turbine engine must be designed and installed so that it can...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hoen, Ben; Cappers, Peter; Wiser, Ryan
2011-04-19
An increasing number of homes in the U.S. have sold with photovoltaic (PV) energy systems installed at the time of sale, yet relatively little research exists that estimates the marginal impacts of those PV systems on home sale prices. A clearer understanding of these possible impacts might influence the decisions of homeowners considering the installation of a PV system, homebuyers considering the purchase of a home with PV already installed, and new home builders considering including PV as an optional or standard product on their homes. This research analyzes a large dataset of California homes that sold from 2000 throughmore » mid-2009 with PV installed. It finds strong evidence that homes with PV systems sold for a premium over comparable homes without PV systems during this time frame. Estimates for this premium expressed in dollars per watt of installed PV range, on average, from roughly $4 to $5.5/watt across a large number of hedonic and repeat sales model specifications and robustness tests. When expressed as a ratio of the sales price premium of PV to estimated annual energy cost savings associated with PV, an average ratio of 14:1 to 19:1 can be calculated; these results are consistent with those of the more-extensive existing literature on the impact of energy efficiency on sales prices. When the data are split among new and existing homes, however, PV system premiums are markedly affected. New homes with PV show premiums of $2.3-2.6/watt, while existing homes with PV show premiums of more than $6/watt. Reasons for this discrepancy are suggested, yet further research is warranted. A number of other areas where future research would be useful are also highlighted.« less
Realization of the variant for management of AzT-2 telescope
NASA Astrophysics Data System (ADS)
Shavlovskyi, V. I.; Puha, S. P.; Vidmachenko, A. P.; Volovyk, D. V.; Puha, G. P.; Obolonskyi, V. O.; Kratko, O. O.; Stefurak, M. V.
2018-05-01
For the control system of the focus of the secondary mirror of the telescope AZT-2 we developed, manufactured and installed on the tube of the telescope a special shield for the addressable microcontroller. To manage its work with using a personal computer, a special control program was written. The tests of this system showed the ability to control the motor of focus unit both from the staff manual console and from the controller. To supply a stabilized voltage of 110 volts to the appropriate consumers, for a network of supplying control signals from a personal computer to the executive nodes via RS485 port, a series of distribution boxes were installed on the column and on the tube of the telescope. The developed software was also adapted to the algorithm of the existing manual system with manual operation. The control system of the telescope AZT-2 was tested in July-September 2017 at observations with the layout of filter polarimeter.
Extended Plate and Beam Wall System: Concept Investigation and Initial Evaluation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wiehagen, J.; Kochkin, V.
A new and innovative High-R wall design, referred to as the Extended Plate & Beam (EP&B), is under development. The EP&B system uniquely integrates foam sheathing insulation with wall framing such that wood structural panels are installed exterior of the foam sheathing, enabling the use of standard practices for installation of drainage plane, windows and doors, claddings, cavity insulation, and the standard exterior foam sheathing installation approach prone to damage of the foam during transportation of prefabricated wall panels. As part of the ongoing work, the EP&B wall system concept has undergone structural verification testing and has been positively vettedmore » by a group of industry stakeholders. Having passed these initial milestone markers, the advanced wall system design has been analyzed to assess cost implications relative to other advanced wall systems, undergone design assessment to develop construction details, and has been evaluated to develop representative prescriptive requirements for the building code. This report summarizes the assessment steps conducted to-date and provides details of the concept development.« less
Extended Plate and Beam Wall System: Concept Investigation and Initial Evaluation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wiehagen, J.; Kochkin, V.
2015-08-01
A new and innovative High-R wall design, referred to as the Extended Plate & Beam (EP&B), is under development. The EP&B system uniquely integrates foam sheathing insulation with wall framing such that wood structural panels are installed exterior of the foam sheathing, enabling the use of standard practices for installation of drainage plane, windows and doors, claddings, cavity insulation, and the standard exterior foam sheathing installation approach prone to damage of the foam during transportation of prefabricated wall panels. As part of the ongoing work, the EP&B wall system concept has undergone structural verification testing and has been positively vettedmore » by a group of industry stakeholders. Having passed these initial milestone markers, the advanced wall system design has been analyzed to assess cost implications relative to other advanced wall systems, undergone design assessment to develop construction details, and has been evaluated to develop representative prescriptive requirements for the building code. This report summarizes the assessment steps conducted to-date and provides details of the concept development.« less
Flight service environmental effects on composite materials and structures
NASA Technical Reports Server (NTRS)
Dexter, H. Benson; Baker, Donald J.
1992-01-01
NASA Langley and the U.S. Army have jointly sponsored programs to assess the effects of realistic flight environments and ground-based exposure on advanced composite materials and structures. Composite secondary structural components were initially installed on commercial transport aircraft in 1973; secondary and primary structural components were installed on commercial helicopters in 1979; and primary structural components were installed on commercial aircraft in the mid-to-late 1980's. Service performance, maintenance characteristics, and residual strength of numerous components are reported. In addition to data on flight components, 10 year ground exposure test results on material coupons are reported. Comparison between ground and flight environmental effects for several composite material systems are also presented. Test results indicate excellent in-service performance with the composite components during the 15 year period. Good correlation between ground-based material performance and operational structural performance has been achieved.
Development of a CCD based solar speckle imaging system
NASA Astrophysics Data System (ADS)
Nisenson, Peter; Stachnik, Robert V.; Noyes, Robert W.
1986-02-01
A program to develop software and hardware for the purpose of obtaining high angular resolution images of the solar surface is described. The program included the procurement of a Charge Coupled Devices imaging system; an extensive laboratory and remote site testing of the camera system; the development of a software package for speckle image reconstruction which was eventually installed and tested at the Sacramento Peak Observatory; and experiments of the CCD system (coupled to an image intensifier) for low light level, narrow spectral band solar imaging.
NASA Technical Reports Server (NTRS)
2003-01-01
KENNEDY SPACE CENTER, FLA. -- In the Orbiter Processing Facility, United Space Alliance employees (from left) Dave Sanborn, Butch Lato, and Bill Brooks conduct a bond verification test on Thermal Protection System tiles newly installed on a main landing gear door of Space Shuttle orbiter Enterprise (OV-101). Sections of Enterprise were borrowed from the Smithsonian Institution's Air and Space Museum where the orbiter is being stored at the Washington Dulles International Airport. Enterprise was the first orbiter built in the Shuttle fleet and was used to conduct the Approach and Landing Test Program before the first powered Shuttle flight. After the tile installation is complete, the sections will be transferred to the Southwest Research Institute for testing requested by the Columbia Accident Investigation Board.
A navigation system for the visually impaired using colored navigation lines and RFID tags.
Seto, First Tatsuya
2009-01-01
In this paper, we describe about a developed navigation system that supports the independent walking of the visually impaired in the indoor space. Our developed instrument consists of a navigation system and a map information system. These systems are installed on a white cane. Our navigation system can follow a colored navigation line that is set on the floor. In this system, a color sensor installed on the tip of a white cane senses the colored navigation line, and the system informs the visually impaired that he/she is walking along the navigation line by vibration. The color recognition system is controlled by a one-chip microprocessor and this system can discriminate 6 colored navigation lines. RFID tags and a receiver for these tags are used in the map information system. The RFID tags and the RFID tag receiver are also installed on a white cane. The receiver receives tag information and notifies map information to the user by mp3 formatted pre-recorded voice. Three normal subjects who were blindfolded with an eye mask were tested with this system. All of them were able to walk along the navigation line. The performance of the map information system was good. Therefore, our system will be extremely valuable in supporting the activities of the visually impaired.
NASA Technical Reports Server (NTRS)
2003-01-01
KENNEDY SPACE CENTER, FLA. -- In the Orbiter Processing Facility, United Space Alliance employee Harrell Watts (right) installs Thermal Protection System tiles on a main landing gear door of Space Shuttle orbiter Enterprise (OV-101). Sections of Enterprise were borrowed from the Smithsonian Institution's Air and Space Museum where the orbiter is being stored at the Washington Dulles International Airport. Enterprise was the first orbiter built in the Shuttle fleet and was used to conduct the Approach and Landing Test Program before the first powered Shuttle flight. After the tile installation is complete, the sections will be transferred to the Southwest Research Institute for testing requested by the Columbia Accident Investigation Board.
46 CFR 25.45-2 - Cooking systems on vessels carrying passengers for hire.
Code of Federal Regulations, 2014 CFR
2014-10-01
... stated therein, and liquefied petroleum gas (LPG), or compressed natural gas (CNG). (b) Cooking systems using LPG or CNG must meet the following requirements: (1) The design, installation, and testing of each... of each CNG system must meet ABYC A-22-78 or chapter 6 of NFPA 302. (3) Cooking systems using chapter...
Aquifer thermal-energy-storage modeling
NASA Astrophysics Data System (ADS)
Schaetzle, W. J.; Lecroy, J. E.
1982-09-01
A model aquifer was constructed to simulate the operation of a full size aquifer. Instrumentation to evaluate the water flow and thermal energy storage was installed in the system. Numerous runs injecting warm water into a preconditioned uniform aquifer were made. Energy recoveries were evaluated and agree with comparisons of other limited available data. The model aquifer is simulated in a swimming pool, 18 ft by 4 ft, which was filled with sand. Temperature probes were installed in the system. A 2 ft thick aquifer is confined by two layers of polyethylene. Both the aquifer and overburden are sand. Four well configurations are available. The system description and original tests, including energy recovery, are described.
Auxiliary propulsion system flight package
NASA Technical Reports Server (NTRS)
Collett, C. R.
1987-01-01
Hughes Aircraft Company developed qualified and integrated flight, a flight test Ion Auxiliary Propulsion System (IAPS), on an Air Force technology satellite. The IAPS Flight Package consists of two identical Thruster Subsystems and a Diagnostic Subsystem. Each thruster subsystem (TSS) is comprised of an 8-cm ion Thruster-Gimbal-Beam Shield Unit (TGBSU); Power Electronics Unit; Digital Controller and Interface Unit (DCIU); and Propellant Tank, Valve and Feed Unit (PTVFU) plus the requisite cables. The Diagnostic Subsystem (DSS) includes four types of sensors for measuring the effect of the ion thrusters on the spacecraft and the surrounding plasma. Flight qualifications of IAPS, prior to installation on the spacecraft, consisted of performance, vibration and thermal-vacuum testing at the unit level, and thermal-vacuum testing at the subsystem level. Mutual compatibility between IAPS and the host spacecraft was demonstrated during a series of performance and environmental tests after the IAPS Flight Package was installed on the spacecraft. After a spacecraft acoustic test, performance of the ion thrusters was reverified by removing the TGBSUs for a thorough performance test at Hughes Research Laboratories (HRL). The TGBSUs were then reinstalled on the spacecraft. The IAPS Flight Package is ready for flight testing when Shuttle flights are resumed.
Code of Federal Regulations, 2014 CFR
2014-07-01
..., or to temperature simulation devices. (vi) Conduct a visual inspection of each sensor every quarter... sensor values with electronic signal simulations or via relative accuracy testing. (v) Perform accuracy... values with electronic signal simulations or with values obtained via relative accuracy testing. (vi...
Code of Federal Regulations, 2013 CFR
2013-07-01
..., or to temperature simulation devices. (vi) Conduct a visual inspection of each sensor every quarter... sensor values with electronic signal simulations or via relative accuracy testing. (v) Perform accuracy... values with electronic signal simulations or with values obtained via relative accuracy testing. (vi...
Code of Federal Regulations, 2012 CFR
2012-07-01
..., or to temperature simulation devices. (vi) Conduct a visual inspection of each sensor every quarter... sensor values with electronic signal simulations or via relative accuracy testing. (v) Perform accuracy... values with electronic signal simulations or with values obtained via relative accuracy testing. (vi...
40 CFR 94.203 - Application for certification.
Code of Federal Regulations, 2013 CFR
2013-07-01
... in § 94.210 to accurately reflect the manufacturer's production. (d) Each application shall include... temperature or engine speed); (iii) Each auxiliary emission control device (AECD); and (iv) All fuel system components to be installed on any production or test engine(s). (3) A description of the test engine. (4...
40 CFR 94.203 - Application for certification.
Code of Federal Regulations, 2011 CFR
2011-07-01
... in § 94.210 to accurately reflect the manufacturer's production. (d) Each application shall include... temperature or engine speed); (iii) Each auxiliary emission control device (AECD); and (iv) All fuel system components to be installed on any production or test engine(s). (3) A description of the test engine. (4...
40 CFR 86.1110-87 - Sample selection.
Code of Federal Regulations, 2013 CFR
2013-07-01
... to be tested pursuant to a PCA in accordance with this subpart will be selected at the location and...-duty engines, if the test engines are selected at a location where they do not have their operational and emission control systems installed, EPA will specify the manner and location for selection of...
40 CFR 86.1110-87 - Sample selection.
Code of Federal Regulations, 2014 CFR
2014-07-01
... be tested pursuant to a PCA in accordance with this subpart will be selected at the location and in... test engines are selected at a location where they do not have their operational and emission control systems installed, EPA will specify the manner and location for selection of components to complete...
40 CFR 86.1110-87 - Sample selection.
Code of Federal Regulations, 2012 CFR
2012-07-01
... to be tested pursuant to a PCA in accordance with this subpart will be selected at the location and...-duty engines, if the test engines are selected at a location where they do not have their operational and emission control systems installed, EPA will specify the manner and location for selection of...
The Impact of Sound-Field Systems on Learning and Attention in Elementary School Classrooms
ERIC Educational Resources Information Center
Dockrell, Julie E.; Shield, Bridget
2012-01-01
Purpose: The authors evaluated the installation and use of sound-field systems to investigate the impact of these systems on teaching and learning in elementary school classrooms. Methods: The evaluation included acoustic surveys of classrooms, questionnaire surveys of students and teachers, and experimental testing of students with and without…
49 CFR 236.1015 - PTC Safety Plan content requirements and PTC System Certification.
Code of Federal Regulations, 2010 CFR
2010-10-01
... established and can maintain a quality control system for PTC system design and manufacturing acceptable to... an explanation of the design principles and assumptions; (3) A risk assessment of the as-built PTC... the specific procedures and test equipment necessary to ensure the safe and proper installation...
40 CFR 280.21 - Upgrading of existing UST systems.
Code of Federal Regulations, 2011 CFR
2011-07-01
... sound and free of corrosion holes prior to installing the cathodic protection system; or (ii) The tank... for corrosion holes by conducting two (2) tightness tests that meet the requirements of § 280.43(c... operation of the cathodic protection system; or (iv) The tank is assessed for corrosion holes by a method...
40 CFR 280.21 - Upgrading of existing UST systems.
Code of Federal Regulations, 2010 CFR
2010-07-01
... sound and free of corrosion holes prior to installing the cathodic protection system; or (ii) The tank... for corrosion holes by conducting two (2) tightness tests that meet the requirements of § 280.43(c... operation of the cathodic protection system; or (iv) The tank is assessed for corrosion holes by a method...
Application of interactive computer graphics in wind-tunnel dynamic model testing
NASA Technical Reports Server (NTRS)
Doggett, R. V., Jr.; Hammond, C. E.
1975-01-01
The computer-controlled data-acquisition system recently installed for use with a transonic dynamics tunnel was described. This includes a discussion of the hardware/software features of the system. A subcritical response damping technique, called the combined randomdec/moving-block method, for use in windtunnel-model flutter testing, that has been implemented on the data-acquisition system, is described in some detail. Some results using the method are presented and the importance of using interactive graphics in applying the technique in near real time during wind-tunnel test operations is discussed.
Dual frequency feed system for the CTS communications link characterization experiment
NASA Technical Reports Server (NTRS)
Gill, G. J.
1976-01-01
The developing, testing and installation of a dual frequency feed assembly were described. The feed has been designed to receive signals in the frequency range 11.7 to 12.2 GHz and transmit signals in the frequency range 14.12 GHz plus or minus 250 MHz. Complete performance data of the feed alone and installed in the 15 foot antenna is included herein. Drawings and descriptive information of the feed assembly are also given.
Introduction to an Open Source Internet-Based Testing Program for Medical Student Examinations
2009-01-01
The author developed a freely available open source internet-based testing program for medical examination. PHP and Java script were used as the programming language and postgreSQL as the database management system on an Apache web server and Linux operating system. The system approach was that a super user inputs the items, each school administrator inputs the examinees' information, and examinees access the system. The examinee's score is displayed immediately after examination with item analysis. The set-up of the system beginning with installation is described. This may help medical professors to easily adopt an internet-based testing system for medical education. PMID:20046457
Introduction to an open source internet-based testing program for medical student examinations.
Lee, Yoon-Hwan
2009-12-20
The author developed a freely available open source internet-based testing program for medical examination. PHP and Java script were used as the programming language and postgreSQL as the database management system on an Apache web server and Linux operating system. The system approach was that a super user inputs the items, each school administrator inputs the examinees' information, and examinees access the system. The examinee's score is displayed immediately after examination with item analysis. The set-up of the system beginning with installation is described. This may help medical professors to easily adopt an internet-based testing system for medical education.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lease, W.D.
1976-08-01
Lease AFEX, Inc., modified its standard design of an automatic fire protection system used in the past on logging equipment, and long-term, in-mine tested system on a Fiat-Alli's HD-41B dozer at the Lemmons and Company coal mine, Boonville, Ind. The modification of the standard AFEX system involved improving the actuation device. The AFEX system is called a point-type thermal sensor, automatic fire protection system. The in-mine test took place in late 1975, and early 1976. The system was then tested by simulating a fire on the dozer. The system operated successfully after the 4 months of in-mine endurance testing. (Colormore » illustrations reproduced in black and white.)« less
Fast Imaging Solar Spectrograph System in New Solar Telescope
NASA Astrophysics Data System (ADS)
Park, Y.-D.; Kim, Y. H.; Chae, J.; Goode, P. R.; Cho, K. S.; Park, H. M.; Nah, J. K.; Jang, B. H.
2010-12-01
In 2004, Big Bear Solar Observatory in California, USA launched a project for construction of the world's largest aperture solar telescope (D = 1.6m) called New Solar Telescope(NST). University of Hawaii (UH) and Korea Astronomy and Space Science Institute(KASI) partly collaborate on the project. NST is a designed off-axis parabolic Gregorian reflector with very high spatial resolution(0.07 arcsec at 5000A) and is equipped with several scientific instruments such as Visible Imaging Magnetograph (VIM), InfraRed Imaging Magnetograph IRIM), and so on. Since these scientific instruments are focused on studies of the solar photosphere, we need a post-focus instrument for the NST to study the fine structures and dynamic patterns of the solar chromosphere and low Transition Region (TR) layer, including filaments/prominences, spicules, jets, micro flares, etc. For this reason, we developed and installed a fast imaging solar spectrograph(FISS) system on the NST withadvantages of achieving compact design with high spectral resolution and small aberration as well as recording many solar spectral lines in a single and/or dual band mode. FISS was installed in May, 2010 and now we carry out a test observation. In this talk, we introduce the FISS system and the results of the test observation after FISS installation.
NASA Glenn Propulsion Systems Lab (PSL) Icing Facility Update
NASA Technical Reports Server (NTRS)
Thomas, Queito P.
2015-01-01
The NASA Glenn Research Center Propulsion Systems Lab (PSL) was recently upgraded to perform engine inlet ice crystal testing in an altitude environment. The system installed 10 spray bars in the inlet plenum for ice crystal generation using 222 spray nozzles. As an altitude test chamber, PSL is capable of simulation of in-flight icing events in a ground test facility. The system was designed to operate at altitudes from 4,000 ft. to 40,000 ft. at Mach numbers up to 0.8M and inlet total temperatures from -60F to +15F.
Implementation of an Outer Can Welding System for Savannah River Site FB-Line
DOE Office of Scientific and Technical Information (OSTI.GOV)
Howard, S.R.
2003-03-27
This paper details three phases of testing to confirm use of a Gas Tungsten Arc (GTA) system for closure welding the 3013 outer container used for stabilization/storage of plutonium metals and oxides. The outer container/lid closure joint was originally designed for laser welding, but for this application, the gas tungsten arc (GTA) welding process has been adapted. The testing progressed in three phases: (1) system checkout to evaluate system components for operational readiness, (2) troubleshooting to evaluate high weld failure rates and develop corrective techniques, and (3) pre-installation acceptance testing.
PKI solar thermal plant evaluation at Capitol Concrete Products, Topeka, Kansas
NASA Astrophysics Data System (ADS)
Hauger, J. S.; Borton, D. N.
1982-07-01
A system feasibility test to determine the technical and operational feasibility of using a solar collector to provide industrial process heat is discussed. The test is of a solar collector system in an industrial test bed plant at Capitol Concrete Products in Topeka, Kansas, with an experiment control at Sandia National Laboratories, Albuquerque. Plant evaluation will occur during a year-long period of industrial utilization. It will include performance testing, operability testing, and system failure analysis. Performance data will be recorded by a data acquisition system. User, community, and environmental inputs will be recorded in logs, journals, and files. Plant installation, start-up, and evaluation, are anticipated for late November, 1981.
PKI solar thermal plant evaluation at Capitol Concrete Products, Topeka, Kansas
NASA Technical Reports Server (NTRS)
Hauger, J. S.; Borton, D. N.
1982-01-01
A system feasibility test to determine the technical and operational feasibility of using a solar collector to provide industrial process heat is discussed. The test is of a solar collector system in an industrial test bed plant at Capitol Concrete Products in Topeka, Kansas, with an experiment control at Sandia National Laboratories, Albuquerque. Plant evaluation will occur during a year-long period of industrial utilization. It will include performance testing, operability testing, and system failure analysis. Performance data will be recorded by a data acquisition system. User, community, and environmental inputs will be recorded in logs, journals, and files. Plant installation, start-up, and evaluation, are anticipated for late November, 1981.
Data Quality Monitoring System for New GEM Muon Detectors for the CMS Experiment Upgrade
NASA Astrophysics Data System (ADS)
King, Robert; CMS Muon Group Team
2017-01-01
The Gas Electron Multiplier (GEM) detectors are novel detectors designed to improve the muon trigger and tracking performance in CMS experiment for the high luminosity upgrade of the LHC. Partial installation of GEM detectors is planned during the 2016-2017 technical stop. Before the GEM system is installed underground, its data acquisition (DAQ) electronics must be thoroughly tested. The DAQ system includes several commercial and custom-built electronic boards running custom firmware. The front-end electronics are radiation-hard and communicate via optical fibers. The data quality monitoring (DQM) software framework has been designed to provide online verification of the integrity of the data produced by the detector electronics, and to promptly identify potential hardware or firmware malfunctions in the system. Local hits reconstruction and clustering algorithms allow quality control of the data produced by each GEM chamber. Once the new detectors are installed, the DQM will monitor the stability and performance of the system during normal data-taking operations. We discuss the design of the DQM system, the software being developed to read out and process the detector data, and the methods used to identify and report hardware and firmware malfunctions of the system.
20. Interior view of fuel storage pit or vault adjacent ...
20. Interior view of fuel storage pit or vault adjacent to Test Cell 9 in Component Test Laboratory (T-27), looking west. Photograph shows upgraded instrumentation, piping, tanks, and technological modifications installed in 1997-99 to accommodate component testing requirements for the Atlas V missile. - Air Force Plant PJKS, Systems Integration Laboratory, Components Test Laboratory, Waterton Canyon Road & Colorado Highway 121, Lakewood, Jefferson County, CO
DOT National Transportation Integrated Search
2013-10-01
The performance of a microwave radar system for vehicle detection at a railroad grade crossing in Hinsdale, : Illinois, was evaluated through field-testing in favorable (normal, good) weather conditions. The system was : installed at a crossing with ...
47 CFR 73.875 - Modification of transmission systems.
Code of Federal Regulations, 2011 CFR
2011-10-01
... test operations at the full authorized ERP may commence immediately upon installation pursuant to § 73... the transmitter operating power (TPO) from the authorized value, but not the ERP, must be reported in...
Cassini's RTGs undergo mechanical and electrical verification testing in the PHSF
NASA Technical Reports Server (NTRS)
1997-01-01
Jet Propulsion Laboratory (JPL) workers carefully roll into place a platform with a second radioisotope thermoelectric generator (RTG) for installation on the Cassini spacecraft. In background at left, the first of three RTGs already has been installed on Cassini. The RTGs will provide electrical power to Cassini on its 6.7-year trip to the Saturnian system and during its four-year mission at Saturn. The power units are undergoing mechanical and electrical verification testing in the Payload Hazardous Servicing Facility. RTGs use heat from the natural decay of plutonium to generate electric power. The generators enable spacecraft to operate far from the Sun where solar power systems are not feasible. The Cassini mission is scheduled for an Oct. 6 launch aboard a Titan IVB/Centaur expendable launch vehicle. Cassini is built and managed for NASA by JPL.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Allehyani, Ahmed; Beshir, Mohammed
Voltage regulators help maintain an acceptable voltage profile for the system. This paper discusses the effect of installing voltage regulators to the system to fix the voltage drop resulting from the electrical vehicles loading increase when they are being charged. The effect will be studied in the afternoon, when the peak load occurs, using the IEEE 34 bus test feeder. First, only one spot node is used to charge the electric vehicles while a voltage regulator is present. Second, five spot nodes are loaded at the same time to charge the electric vehicles while voltage regulators are installed at eachmore » node. After that, the impact of electric vehicles on distribution feeders that do not have voltage regulators will appear.« less
78 FR 45104 - Model Manufactured Home Installation Standards: Ground Anchor Installations
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-26
... test methods for establishing working load design values of ground anchor assemblies used for new... anchor installations and establish standardized test methods to determine ground anchor performance and... currently no national test method for rating and certifying ground anchor assemblies in different soil...
46 CFR 176.702 - Installation tests and inspections.
Code of Federal Regulations, 2012 CFR
2012-10-01
..., machinery, fuel tank, or pressure vessel is installed aboard a vessel after completion of the initial... 100 GROSS TONS) INSPECTION AND CERTIFICATION Repairs and Alterations § 176.702 Installation tests and...
46 CFR 176.702 - Installation tests and inspections.
Code of Federal Regulations, 2011 CFR
2011-10-01
..., machinery, fuel tank, or pressure vessel is installed aboard a vessel after completion of the initial... 100 GROSS TONS) INSPECTION AND CERTIFICATION Repairs and Alterations § 176.702 Installation tests and...
46 CFR 176.702 - Installation tests and inspections.
Code of Federal Regulations, 2014 CFR
2014-10-01
..., machinery, fuel tank, or pressure vessel is installed aboard a vessel after completion of the initial... 100 GROSS TONS) INSPECTION AND CERTIFICATION Repairs and Alterations § 176.702 Installation tests and...
46 CFR 176.702 - Installation tests and inspections.
Code of Federal Regulations, 2013 CFR
2013-10-01
..., machinery, fuel tank, or pressure vessel is installed aboard a vessel after completion of the initial... 100 GROSS TONS) INSPECTION AND CERTIFICATION Repairs and Alterations § 176.702 Installation tests and...
46 CFR 176.702 - Installation tests and inspections.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., machinery, fuel tank, or pressure vessel is installed aboard a vessel after completion of the initial... 100 GROSS TONS) INSPECTION AND CERTIFICATION Repairs and Alterations § 176.702 Installation tests and...
A cost effective method of meeting emission requirements from a 50 MMscfd glycol dehydrator
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gearhart, L.E.
1998-12-31
The removal of volatile organic compounds (VOC) and benzene, toluene, ethylbenzene, xylene (BTEX) from glycol dehydration systems does not require costly equipment or elaborate controls. This paper will describe the design and installation of a 10 equivalent try glycol dehydration unit for field gas dehydration. The absorber design minimizes the absorption of VOC and BTEX by requiring 1.0 to 1.5 gallons of glycol per pound of water removed. Glycol unit VOC emissions are effectively controlled without installing vent gas condensers which require disposal of the waste condensate. The emission control system on this unit is simple to operate, meets emissionmore » standards and the dehydrator design achieves pipeline sales gas specifications at a reasonable cost. The system reduces the VOC and BTEX by adding a stripper on the glycol going to the reboiler. A 50 MMscfd dehydrator was installed in December 1995 and the results of an emission test done in April 1997 are presented in this paper.« less
Horiuchi, Tsutomu; Tobita, Tatsuya; Miura, Toru; Iwasaki, Yuzuru; Seyama, Michiko; Inoue, Suzuyo; Takahashi, Jun-ichi; Haga, Tsuneyuki; Tamechika, Emi
2012-01-01
We have developed a measurement chip installation/removal mechanism for a surface plasmon resonance (SPR) immunoassay analysis instrument designed for frequent testing, which requires a rapid and easy technique for changing chips. The key components of the mechanism are refractive index matching gel coated on the rear of the SPR chip and a float that presses the chip down. The refractive index matching gel made it possible to optically couple the chip and the prism of the SPR instrument easily via elastic deformation with no air bubbles. The float has an autonomous attitude control function that keeps the chip parallel in relation to the SPR instrument by employing the repulsive force of permanent magnets between the float and a float guide located in the SPR instrument. This function is realized by balancing the upward elastic force of the gel and the downward force of the float, which experiences a leveling force from the float guide. This system makes it possible to start an SPR measurement immediately after chip installation and to remove the chip immediately after the measurement with a simple and easy method that does not require any fine adjustment. Our sensor chip, which we installed using this mounting system, successfully performed an immunoassay measurement on a model antigen (spiked human-IgG) in a model real sample (non-homogenized milk) that included many kinds of interfering foreign substances without any sample pre-treatment. The ease of the chip installation/removal operation and simple measurement procedure are suitable for frequent on-site agricultural, environmental and medical testing. PMID:23202030
Smart Building. Volume 2: System Description
2006-05-01
demonstrated.this technology at the 2002 Winter Olympic Games in Salt Lake City, Utah. The system was installed on a building known as Social Hall Plaza...select the detailed engineering contractors. 3.1.3.8 Sealing the Protective Envelope Due to the type of roof construction on the building there was ...in time to support the Olympics . Prototype testing was completed following the Olympics and additional testing may be performed to better
Department of Defense Abstracts of Phase 2 Awards 1991
1991-01-01
the static stiffness of these materials as measured by comprcssiun testing indicated that the materials are too flexible to sustain submergence ...design, analysis and experiment has been iti) procduce a comlplete design’ l’or an improved MBR systems. This objective has been completely met in a...propoised toc fabhricate, assemble, test, deliver, and install a complete MBR system including computer, and sollwaire lfar ciperatimig the mnstrummiicm
Boston Community Information System 1986 Experimental Test Results.
1987-08-01
self -selected participants have a strong technical orientation and high educational achievement. In addition, five visually impaired people use the...group. The experimental test of the system was performed on a self -selected population of computer literate volunteers. In order to simplify the test...for fat respose .’ - 1041 OI haven’t used it yet.’ - 1046 ’No modem yet. New version installed 11/2/86.0 - 1047 ’Not yet tried. Wil do so moon.’ - 1061
NASA Technical Reports Server (NTRS)
Tomaro, D. J.
1982-01-01
During extravehicular activity (EVA), communications between the EVA astronaut and the space shuttle orbiter are maintained by means of transceiver installed in the environmental support system backpack. Onboard the orbiter, a transceiver line replaceable unit and its associated equipment performs the task of providing a communications link to the astronaut in the extravehicular activity/air traffic control (EVA/ATC) mode. Results of the acceptance tests that performed on the system designed and fabricated for EVA/ATC testing are discussed.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-18
... Division of CareNetwork, Inc., Front End Operations and Account Installation-Product Testing Groups, De... a Division of Carenetwork, Inc. Front End Operations and Account Installation-Product Testing Groups..., a Division of CareNetwork, Inc., Front End Operations and Account Installation- Product Testing...
2010-10-27
The first of nine chemical steam generator (CSG) units that will be used on the A-3 Test Stand is prepared for installation Oct. 24, 2010, at John C. Stennis Space Center. The unit was installed at the E-2 Test Stand for verification and validation testing before it is moved to the A-3 stand. Steam generated by the nine CSG units that will be installed on the A-3 stand will create a vacuum that allows Stennis operators to test next-generation rocket engines at simulated altitudes up to 100,000 feet.
A Vibration Isolation System for Use in a Large Thermal Vacuum Test Facility
NASA Technical Reports Server (NTRS)
Hershfeld, Donald; VanCampen, Julie
2002-01-01
A thermal vacuum payload platform that is isolated from background vibration is required to support the development of future instruments for Hubble Space Telescope (HST) and the Next Generation Space Telescope (NGST) at the Goddard Space Flight Center (GSFC). Because of the size and weight of the thermal/vacuum facility in which the instruments are tested, it is not practical to isolate the entire facility externally. Therefore, a vibration isolation system has been designed and fabricated to be installed inside the chamber. The isolation system provides a payload interface of 3.05 m (10 feet) in diameter and is capable of supporting a maximum payload weight of 4536 kg (10,000 Lbs). A counterweight system has been included to insure stability of payloads having high centers of gravity. The vibration isolation system poses a potential problem in that leakage into the chamber could compromise the ability to maintain vacuum. Strict specifications were imposed on the isolation system design to minimize leakage. Vibration measurements, obtained inside the chamber, prior to installing the vibration isolation system, indicated levels in all axes of approximately 1 milli-g at about 20 Hz. The vibration isolation system was designed to provide a minimum attenuation of 40 dB to these levels. This paper describes the design and testing of this unique vibration isolation system. Problems with leakage and corrective methods are presented. Isolation performance results are also presented.
Department of Defense In-House RDT and E Activities
1976-10-30
BALLISTIC TESTS.FAC AVAL FCR TESIS OF SP ELELTRONIC’ FIl’ CON EQUIP 4 RELATED SYSTEMS E COMPONFNTZ, 35 INSTALLATION: MEDICAL BIOENGINEERINC- R&D LABORATORY...ANALYSIS OF CHEMICAL AND METALLOGRAPHIC EFFECTS, MICROBIOLOGICAL EFFECTS, CLIMATIC ENVIRONMENTAL EFFECTS. TEST AND EVALUATE WARHEADS AND SPECIAL...CCMMUNICATI’N SYST:M INSTRUMENTED DROP ZONES ENGINEERING TEST FACILITY INSTRUMENTATION CALIBRATICN FACILITY SCIENTIFIC COMPUTER CENTER ENVIRONMENTAL TESY
Thin film temperature sensors, phase 3. [for engine-test evaluation
NASA Technical Reports Server (NTRS)
Grant, H. P.; Przybyszewski, J. S.; Claing, R. G.; Anderson, W. L.
1982-01-01
A thin film thermocouple system installation suitable for engine test evaluation was designed, and an engine test plan was prepared. Film adherence, durability, accuracy, and drift characteristics were improved. Film thickness was increased to 14 microns, and drift was reduced to less than 0.02 percent of Fahrenheit temperature per hour on actual turbine blades at 1255 K.
Automotive Stirling Engine Development Project
NASA Technical Reports Server (NTRS)
Ernst, William D.; Shaltens, Richard K.
1997-01-01
The development and verification of automotive Stirling engine (ASE) component and system technology is described as it evolved through two experimental engine designs: the Mod 1 and the Mod 2. Engine operation and performance and endurance test results for the Mod 1 are summarized. Mod 2 engine and component development progress is traced from the original design through hardware development, laboratory test, and vehicle installation. More than 21,000 hr of testing were accomplished, including 4800 hr with vehicles that were driven more dm 59,000 miles. Mod 2 engine dynamometer tests demonstrated that the engine system configuration had accomplished its performance goals for power (60 kW) and efficiency (38.5%) to within a few percent. Tests with the Mod 2 engine installed in a delivery van demonstrated combined metro-highway fuel economy improvements consistent with engine performance goals and the potential for low emission levels. A modified version of the Mod 2 has been identified as a manufacturable design for an ASE. As part of the ASE project, the Industry Test and Evaluation Program (ITEP), NASA Technology Utilization (TU) project, and the industry-funded Stirling Natural Gas Engine program were undertaken to transfer ASE technology to end users. The results of these technology transfer efforts are also summarized.
Results of low power deicer tests on a swept inlet component in the NASA Lewis icing research tunnel
NASA Technical Reports Server (NTRS)
Bond, Thomas H.; Shin, Jaiwon
1993-01-01
Tests were conducted under a USAF/NASA Low Power Deicer program on two expulsive technologies to examine system performance on hardware representative of a modern aircraft part. The BF Goodrich Electro-Expulsive Deicing System and Pneumatic Impulse Ice Protection System were installed on a swept, compound curve, engine inlet component with varying leading edge radius, and tested through a range of icing and system operating conditions in the NASA Lewis Icing Research Tunnel. A description of the experimental procedure and results, including residual ice thickness, shed ice particle size, and changes in system energy/pressure characteristics are presented.
Results of Low Power Deicer tests on a swept inlet component in the NASA Lewis Icing Research Tunnel
NASA Technical Reports Server (NTRS)
Bond, Thomas H.; Shin, Jaiwon
1993-01-01
Tests were conducted under a USAF/NASA Low Power Deicer program on two expulsive technologies to examine system performance on hardware representative of a modern aircraft part. The BF Goodrich Electro-Expulsive Deicing System and Pneumatic Impulse Ice Protection system were installed on a swept, compound curve, engine inlet component with varying leading edge radius, and tested through a range of icing and system operating conditions in the NASA Lewis Icing Research Tunnel. A description of the experimental procedure and results, including residual ice thickness, shed ice particle size, and changes in system energy/pressure characteristics are presented.
Design of the micro pressure multi-node measuring system for micro-fluidic chip
NASA Astrophysics Data System (ADS)
Mu, Lili; Guo, Shuheng; Rong, Li; Yin, Ke
2016-01-01
An online multi-node microfludic pressure measuring system was designed in the paper. The research focused on the design of pressure test circuit system and methods on dealing with pressure data collecting. The MPXV7002 micro-pressure sensor was selected to measure the chip inside channel pressure and installed by a silicone tube on different micro-channel measured nodes. The pressure transmission loss was estimated in the paper, and corrected by the filtering and smoothing method. The pressure test experiment was carried out and the data were analyzed. Finally, the measuring system was calibrated. The results showed that the measuring system had high testing precision.
Measuring the Internal Environment of Solid Rocket Motors During Ignition
NASA Technical Reports Server (NTRS)
Weisenberg, Brent; Smith, Doug; Speas, Kyle; Corliss, Adam
2003-01-01
A new instrumentation system has been developed to measure the internal environment of solid rocket test motors during motor ignition. The system leverages conventional, analog gages with custom designed, electronics modules to provide safe, accurate, high speed data acquisition capability. To date, the instrumentation system has been demonstrated in a laboratory environment and on subscale static fire test motors ranging in size from 5-inches to 24-inches in diameter. Ultimately, this system is intended to be installed on a full-scale Reusable Solid Rocket Motor. This paper explains the need for the data, the components and capabilities of the system, and the test results.
2001-12-01
KENNEDY SPACE CENTER, Fla. - STS-109 Mission Specialist Richard Lennehan (left) and Payload Commander John Grunsfeld get a feel for tools and equipment that will be used on the mission. The crew is at KSC to take part in Crew Equipment Interface Test activities that include familiarization with the orbiter and equipment. The goal of the mission is to service the HST, replacing Solar Array 2 with Solar Array 3, replacing the Power Control Unit, removing the Faint Object Camera and installing the Advanced Camera for Surveys, installing the Near Infrared Camera and Multi-Object Spectrometer (NICMOS) Cooling System, and installing New Outer Blanket Layer insulation on bays 5 through 8. Mission STS-109 is scheduled for launch Feb. 14, 2002
2009-06-10
CAPE CANAVERAL, Fla. – A new window is lowered toward the existing Firing Room windows in the Launch Control Center at NASA's Kennedy Space Center in Florida. New, hurricane-rated window systems for the four Firing Rooms and the vestibule areas between Firing Rooms 1 & 2 and Firing Rooms 3 & 4 are being installed. In order to avoid operational impacts the new windows are being installed on the outside of the existing windows, enclosing the space formerly occupied by the louvers. The old windows will remain in place until the new windows are completely installed and leak tested. This approach will continue to keep the firing rooms from being exposed to the elements. Photo credit: NASA/Jack Pfaller
2009-06-10
CAPE CANAVERAL, Fla. – A new window is lowered toward the existing Firing Room windows in the Launch Control Center at NASA's Kennedy Space Center in Florida. New, hurricane-rated window systems for the four Firing Rooms and the vestibule areas between Firing Rooms 1 & 2 and Firing Rooms 3 & 4 are being installed. In order to avoid operational impacts the new windows are being installed on the outside of the existing windows, enclosing the space formerly occupied by the louvers. The old windows will remain in place until the new windows are completely installed and leak tested. This approach will continue to keep the firing rooms from being exposed to the elements. Photo credit: NASA/Jack Pfaller
2009-06-10
CAPE CANAVERAL, Fla. – Work continues on removing the louvers and replacing the windows on the Firing Room windows in the Launch Control Center at NASA's Kennedy Space Center in Florida. New, hurricane-rated window systems for the four Firing Rooms and the vestibule areas between Firing Rooms 1 & 2 and Firing Rooms 3 & 4 are being installed. In order to avoid operational impacts the new windows are being installed on the outside of the existing windows, enclosing the space formerly occupied by the louvers. The old windows will remain in place until the new windows are completely installed and leak tested. This approach will continue to keep the firing rooms from being exposed to the elements. Photo credit: NASA/Jack Pfaller