47 CFR 73.1610 - Equipment tests.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 4 2010-10-01 2010-10-01 false Equipment tests. 73.1610 Section 73.1610... Rules Applicable to All Broadcast Stations § 73.1610 Equipment tests. (a) During the process of..., without further authority from the FCC, conduct equipment tests for the purpose of making such adjustments...
47 CFR 73.1610 - Equipment tests.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 4 2011-10-01 2011-10-01 false Equipment tests. 73.1610 Section 73.1610... Rules Applicable to All Broadcast Stations § 73.1610 Equipment tests. (a) During the process of..., without further authority from the FCC, conduct equipment tests for the purpose of making such adjustments...
47 CFR 73.1610 - Equipment tests.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 47 Telecommunication 4 2012-10-01 2012-10-01 false Equipment tests. 73.1610 Section 73.1610... Rules Applicable to All Broadcast Stations § 73.1610 Equipment tests. (a) During the process of..., without further authority from the FCC, conduct equipment tests for the purpose of making such adjustments...
Code of Federal Regulations, 2011 CFR
2011-10-01
..., special test equipment or special tooling. Government-furnished property means property in the possession... contractor-acquired property. Government property includes material, equipment, special tooling, special test... end-item. Material does not include equipment, special tooling, special test equipment or real...
47 CFR 74.13 - Equipment tests.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 4 2010-10-01 2010-10-01 false Equipment tests. 74.13 Section 74.13... Services in Part 74 § 74.13 Equipment tests. (a) During the process of construction of any class of radio... equipment tests for the purpose of such adjustments and measurements as may be necessary to assure...
47 CFR 78.23 - Equipment tests.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 4 2010-10-01 2010-10-01 false Equipment tests. 78.23 Section 78.23... SERVICE Applications and Licenses § 78.23 Equipment tests. (a) Following the grant of a CARS license, the... Commission, conduct equipment tests for the purpose of such adjustments and measurements as may be necessary...
42 CFR 493.1252 - Standard: Test systems, equipment, instruments, reagents, materials, and supplies.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 5 2010-10-01 2010-10-01 false Standard: Test systems, equipment, instruments... REQUIREMENTS Quality System for Nonwaived Testing Analytic Systems § 493.1252 Standard: Test systems, equipment...) Temperature. (3) Humidity. (4) Protection of equipment and instruments from fluctuations and interruptions in...
47 CFR 74.13 - Equipment tests.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 4 2011-10-01 2011-10-01 false Equipment tests. 74.13 Section 74.13... Services in Part 74 § 74.13 Equipment tests. (a) During the process of construction of any class of radio... equipment tests for the purpose of such adjustments and measurements as may be necessary to assure...
47 CFR 78.23 - Equipment tests.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 4 2011-10-01 2011-10-01 false Equipment tests. 78.23 Section 78.23... SERVICE Applications and Licenses § 78.23 Equipment tests. (a) Following the grant of a CARS license, the... Commission, conduct equipment tests for the purpose of such adjustments and measurements as may be necessary...
47 CFR 78.23 - Equipment tests.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 47 Telecommunication 4 2012-10-01 2012-10-01 false Equipment tests. 78.23 Section 78.23... SERVICE Applications and Licenses § 78.23 Equipment tests. (a) Following the grant of a CARS license, the... Commission, conduct equipment tests for the purpose of such adjustments and measurements as may be necessary...
47 CFR 74.13 - Equipment tests.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 47 Telecommunication 4 2012-10-01 2012-10-01 false Equipment tests. 74.13 Section 74.13... Services in Part 74 § 74.13 Equipment tests. (a) During the process of construction of any class of radio... equipment tests for the purpose of such adjustments and measurements as may be necessary to assure...
Contact Dermatitis to Personal Sporting Equipment in Youth.
Marzario, Barbara; Burrows, Dianne; Skotnicki, Sandy
2016-07-01
Contact dermatitis to personal sporting equipment in youth is poorly studied. To review the results of patch testing 6 youth to their sporting equipment in a dermatology general private practice from 2006 to 2011. A retrospective analysis of 6 youth aged 11 to 14 who were evaluated for chronic and persistent dermatitis occurring in relation to sports equipment was conducted. All patients were subjected to epicutaneous (patch) testing, which included some or all of the following: North American Contact Dermatitis Group (NACGD) series, textile series, rubber series, corticosteroid series, and raw material from the patients' own personal equipment. All cases had 1 or more positive patch test reactions to an allergen within the aforementioned series, and 3 subjects tested positive to their personal equipment in raw form. Allergic contact dermatitis, not irritant, was deemed the relevant cause of chronic dermatitis in 4 of the 6 patients due to positive reactions to epicutaneous tests and/or personal equipment. The utility of testing to patients' own sporting equipment was shown to be of additional value and should be considered when patch testing for contact allergy to sporting equipment. © The Author(s) 2015.
14 CFR Appendix D to Part 27 - HIRF Environments and Equipment HIRF Test Levels
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false HIRF Environments and Equipment HIRF Test...—HIRF Environments and Equipment HIRF Test Levels This appendix specifies the HIRF environments and... for the HIRF environments and laboratory equipment HIRF test levels are expressed in root-mean-square...
14 CFR Appendix D to Part 27 - HIRF Environments and Equipment HIRF Test Levels
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false HIRF Environments and Equipment HIRF Test...—HIRF Environments and Equipment HIRF Test Levels This appendix specifies the HIRF environments and... for the HIRF environments and laboratory equipment HIRF test levels are expressed in root-mean-square...
14 CFR Appendix D to Part 27 - HIRF Environments and Equipment HIRF Test Levels
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false HIRF Environments and Equipment HIRF Test...—HIRF Environments and Equipment HIRF Test Levels This appendix specifies the HIRF environments and... for the HIRF environments and laboratory equipment HIRF test levels are expressed in root-mean-square...
14 CFR Appendix D to Part 27 - HIRF Environments and Equipment HIRF Test Levels
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false HIRF Environments and Equipment HIRF Test...—HIRF Environments and Equipment HIRF Test Levels This appendix specifies the HIRF environments and... for the HIRF environments and laboratory equipment HIRF test levels are expressed in root-mean-square...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-11
... CFR Parts 108, 117, et al. Lifesaving Equipment: Production Testing and Harmonization With... Equipment: Production Testing and Harmonization With International Standards AGENCY: Coast Guard, DHS... equipment, including launching appliances (winches and davits), release mechanisms, survival craft...
40 CFR 51.358 - Test equipment.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 2 2014-07-01 2014-07-01 false Test equipment. 51.358 Section 51.358....358 Test equipment. Computerized emission test systems are required for performing an official emissions test on subject vehicles. (a) Performance features of computerized emission test systems. The...
40 CFR 51.358 - Test equipment.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 2 2010-07-01 2010-07-01 false Test equipment. 51.358 Section 51.358....358 Test equipment. Computerized emission test systems are required for performing an official emissions test on subject vehicles. (a) Performance features of computerized emission test systems. The...
14 CFR Appendix E to Part 29 - HIRF Environments and Equipment HIRF Test Levels
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false HIRF Environments and Equipment HIRF Test... 29—HIRF Environments and Equipment HIRF Test Levels This appendix specifies the HIRF environments and... for the HIRF environments and laboratory equipment HIRF test levels are expressed in root-mean-square...
14 CFR Appendix E to Part 29 - HIRF Environments and Equipment HIRF Test Levels
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false HIRF Environments and Equipment HIRF Test... 29—HIRF Environments and Equipment HIRF Test Levels This appendix specifies the HIRF environments and... for the HIRF environments and laboratory equipment HIRF test levels are expressed in root-mean-square...
14 CFR Appendix J to Part 23 - HIRF Environments and Equipment HIRF Test Levels
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false HIRF Environments and Equipment HIRF Test.... 23, App. J Appendix J to Part 23—HIRF Environments and Equipment HIRF Test Levels This appendix specifies the HIRF environments and equipment HIRF test levels for electrical and electronic systems under...
14 CFR Appendix L to Part 25 - HIRF Environments and Equipment HIRF Test Levels
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false HIRF Environments and Equipment HIRF Test... 25—HIRF Environments and Equipment HIRF Test Levels This appendix specifies the HIRF environments and... for the HIRF environments and equipment HIRF test levels are expressed in root-mean-square units...
14 CFR Appendix L to Part 25 - HIRF Environments and Equipment HIRF Test Levels
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false HIRF Environments and Equipment HIRF Test... 25—HIRF Environments and Equipment HIRF Test Levels This appendix specifies the HIRF environments and... for the HIRF environments and equipment HIRF test levels are expressed in root-mean-square units...
14 CFR Appendix E to Part 29 - HIRF Environments and Equipment HIRF Test Levels
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false HIRF Environments and Equipment HIRF Test... 29—HIRF Environments and Equipment HIRF Test Levels This appendix specifies the HIRF environments and... for the HIRF environments and laboratory equipment HIRF test levels are expressed in root-mean-square...
14 CFR Appendix J to Part 23 - HIRF Environments and Equipment HIRF Test Levels
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false HIRF Environments and Equipment HIRF Test.... 23, App. J Appendix J to Part 23—HIRF Environments and Equipment HIRF Test Levels This appendix specifies the HIRF environments and equipment HIRF test levels for electrical and electronic systems under...
14 CFR Appendix E to Part 29 - HIRF Environments and Equipment HIRF Test Levels
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false HIRF Environments and Equipment HIRF Test... 29—HIRF Environments and Equipment HIRF Test Levels This appendix specifies the HIRF environments and... for the HIRF environments and laboratory equipment HIRF test levels are expressed in root-mean-square...
14 CFR Appendix L to Part 25 - HIRF Environments and Equipment HIRF Test Levels
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false HIRF Environments and Equipment HIRF Test... 25—HIRF Environments and Equipment HIRF Test Levels This appendix specifies the HIRF environments and... for the HIRF environments and equipment HIRF test levels are expressed in root-mean-square units...
14 CFR Appendix J to Part 23 - HIRF Environments and Equipment HIRF Test Levels
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false HIRF Environments and Equipment HIRF Test.... 23, App. J Appendix J to Part 23—HIRF Environments and Equipment HIRF Test Levels This appendix specifies the HIRF environments and equipment HIRF test levels for electrical and electronic systems under...
14 CFR Appendix L to Part 25 - HIRF Environments and Equipment HIRF Test Levels
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false HIRF Environments and Equipment HIRF Test... 25—HIRF Environments and Equipment HIRF Test Levels This appendix specifies the HIRF environments and... for the HIRF environments and equipment HIRF test levels are expressed in root-mean-square units...
14 CFR Appendix J to Part 23 - HIRF Environments and Equipment HIRF Test Levels
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false HIRF Environments and Equipment HIRF Test.... 23, App. J Appendix J to Part 23—HIRF Environments and Equipment HIRF Test Levels This appendix specifies the HIRF environments and equipment HIRF test levels for electrical and electronic systems under...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-24
... Efficiency Program for Certain Commercial and Industrial Equipment: Test Procedures for Commercial Refrigeration Equipment AGENCY: Office of Energy Efficiency and Renewable Energy, Department of Energy. ACTION... amendments to its test procedure for commercial refrigeration equipment (CRE). The amendments would update...
47 CFR 73.712 - Equipment tests.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 4 2010-10-01 2010-10-01 false Equipment tests. 73.712 Section 73.712... International Broadcast Stations § 73.712 Equipment tests. (a) During the process of construction of an... set forth in the Note to § 73.702(d) may, without further authority of the FCC, conduct equipment...
40 CFR 1068.210 - What are the provisions for exempting test engines/equipment?
Code of Federal Regulations, 2013 CFR
2013-07-01
... NONROAD PROGRAMS Exemptions and Exclusions § 1068.210 What are the provisions for exempting test engines/equipment? (a) We may exempt engines/equipment that you will use for research, investigations, studies... test engines/equipment? 1068.210 Section 1068.210 Protection of Environment ENVIRONMENTAL PROTECTION...
40 CFR 1068.210 - What are the provisions for exempting test engines/equipment?
Code of Federal Regulations, 2014 CFR
2014-07-01
... NONROAD PROGRAMS Exemptions and Exclusions § 1068.210 What are the provisions for exempting test engines/equipment? (a) We may exempt engines/equipment that you will use for research, investigations, studies... test engines/equipment? 1068.210 Section 1068.210 Protection of Environment ENVIRONMENTAL PROTECTION...
40 CFR 1068.210 - What are the provisions for exempting test engines/equipment?
Code of Federal Regulations, 2012 CFR
2012-07-01
... NONROAD PROGRAMS Exemptions and Exclusions § 1068.210 What are the provisions for exempting test engines/equipment? (a) We may exempt engines/equipment that you will use for research, investigations, studies... test engines/equipment? 1068.210 Section 1068.210 Protection of Environment ENVIRONMENTAL PROTECTION...
Code of Federal Regulations, 2012 CFR
2012-01-01
... SUCH CARRIAGE (ATP); INSPECTION, TESTING, AND CERTIFICATION OF SPECIAL EQUIPMENT Procedures for Testing of Equipment § 3300.7 General. Testing of equipment according to the ATP is basically done in two...
Code of Federal Regulations, 2013 CFR
2013-01-01
... SUCH CARRIAGE (ATP); INSPECTION, TESTING, AND CERTIFICATION OF SPECIAL EQUIPMENT Procedures for Testing of Equipment § 3300.7 General. Testing of equipment according to the ATP is basically done in two...
Code of Federal Regulations, 2011 CFR
2011-01-01
... SUCH CARRIAGE (ATP); INSPECTION, TESTING, AND CERTIFICATION OF SPECIAL EQUIPMENT Procedures for Testing of Equipment § 3300.7 General. Testing of equipment according to the ATP is basically done in two...
Code of Federal Regulations, 2014 CFR
2014-01-01
... SUCH CARRIAGE (ATP); INSPECTION, TESTING, AND CERTIFICATION OF SPECIAL EQUIPMENT Procedures for Testing of Equipment § 3300.7 General. Testing of equipment according to the ATP is basically done in two...
Communication Satellite Payload Special Check out Equipment (SCOE) for Satellite Testing
NASA Astrophysics Data System (ADS)
Subhani, Noman
2016-07-01
This paper presents Payload Special Check out Equipment (SCOE) for the test and measurement of communication satellite Payload at subsystem and system level. The main emphasis of this paper is to demonstrate the principle test equipment, instruments and the payload test matrix for an automatic test control. Electrical Ground Support Equipment (EGSE)/ Special Check out Equipment (SCOE) requirements, functions and architecture for C-band and Ku-band payloads are presented in details along with their interface with satellite during different phases of satellite testing. It provides test setup, in a single rack cabinet that can easily be moved from payload assembly and integration environment to thermal vacuum chamber all the way to launch site (for pre-launch test and verification).
VIEW OF ULTRASONIC TESTING EQUIPMENT IN BUILDING 991. THIS EQUIPMENT ...
VIEW OF ULTRA-SONIC TESTING EQUIPMENT IN BUILDING 991. THIS EQUIPMENT NON-DESTRUCTIVELY TESTS WEAPONS COMPONENTS FOR FLAWS AND CRACKS. (9/11/85) - Rocky Flats Plant, Final Assembly & Shipping, Eastern portion of plant site, south of Spruce Avenue, east of Tenth Street & north of Central Avenue, Golden, Jefferson County, CO
Evidence-based analysis of field testing of medical electrical equipment.
Taktak, A G; Brown, M C
2006-01-01
Field testing of medical electrical equipment remains a topic of debate amongst biomedical engineers. A questionnaire was circulated among members of the main professional body for Medical Engineering Departments in the UK and Ireland and in the Medical Physics and Engineering Mailbase Server. The aim of the questionnaire was to establish consensus on common practice on the frequency and type of safety tests carried out in the field and common sources of hazards and risk management. Twenty-six replies were received in total. A clear majority of 54% of the respondents reported that they carried out safety tests on hospital-based medical equipment on a yearly basis. For other equipment, regular tests were carried out by 58% on loan equipment and by 69% on medical electrical systems. Laboratory equipment on the other hand were not tested in 42% of the cases. Domiciliary and research equipment were only tested in 11% and 15% of the cases respectively. A clear majority of 93% said that they label equipment after tests, 34% said that they always record the actual values (as opposed to pass or fail) and 54% said they carry out functional test as part of the safety test. Although 61% of failures were attributed to the mains lead, only 50% of the respondents said that they had a management system in place for detachable mains leads.
Evaluation of test equipment for the detection of contamination on electronic circuits
NASA Astrophysics Data System (ADS)
Bergendahl, C. G.; Dunn, B. D.
1984-08-01
The reproducibility, sensitivity and ease of operation of test equipment for the detection of ionizable contaminants on the surface of printed circuit assemblies were assessed. The characteristics of the test equipment are described. Soldering fluxes were chosen as contaminants and were applied in controlled amounts to printed-circuit board assemblies possessing two different component populations. Results show that the relationship between equipment readings varies with flux type. Each kind of test equipment gives a good measure of board cleanliness, although reservations exist concerning the interpretation of such results. A test method for the analysis of total (organic and inorganic) halides in solder fluxes is presented.
40 CFR 85.2231 - On-board diagnostic test equipment requirements.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 19 2012-07-01 2012-07-01 false On-board diagnostic test equipment... Warranty Short Tests § 85.2231 On-board diagnostic test equipment requirements. (a) The test system interface to the vehicle shall include a plug that conforms to SAE J1962 “Diagnostic Connector.” The...
40 CFR 85.2231 - On-board diagnostic test equipment requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 18 2011-07-01 2011-07-01 false On-board diagnostic test equipment... Warranty Short Tests § 85.2231 On-board diagnostic test equipment requirements. (a) The test system interface to the vehicle shall include a plug that conforms to SAE J1962 “Diagnostic Connector.” The...
40 CFR 85.2231 - On-board diagnostic test equipment requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 19 2013-07-01 2013-07-01 false On-board diagnostic test equipment... Warranty Short Tests § 85.2231 On-board diagnostic test equipment requirements. (a) The test system interface to the vehicle shall include a plug that conforms to SAE J1962 “Diagnostic Connector.” The...
Lower currents: a new choice for routine testing.
Backes, John
2007-01-01
U.S. NFPA and AAMI standards both recommend a 10A ground bond test and, as has been described above, both 25A and 200mA are also recommended internationally as valid test currents for the in-service testing and inspection of medical electrical equipment. The reality is that both high and low test currents are of value to biomedical engineers and technicians in different circumstances. For benchtop testing in a workshop environment, where required test currents can be applied safely, then it seems likely that high current testing will remain the preferred option. However, for in-service test applications, where the portability and versatility of the tester is a key requirement, modern electronic technology now means that low current testing can now be applied effectively and safely. In summary, by using a low-energy, high current pulse prior to 200 mA test current, the lower test current is preferred for routine field maintenance as this can mean: Increased safety of the operator. Reduced risk of damage to the in-service medical equipment. Smaller test instruments to include valid ground bond measurements. Battery operated test equipment. Increased flexibility of the test engineer due to lightweight test equipment. Cost reduction due to reduced down time of medical equipment. More economical availability of test equipment.
Testing and Evaluation of Passive Radiation Detection Equipment for Homeland Security
West, David L.; Wood, Nathan L.; Forrester, Christina D.
2017-12-01
This article is concerned with test and evaluation methods for passive radiation detection equipment used in homeland security applications. The different types of equipment used in these applications are briefly reviewed and then test and evaluation methods discussed. The primary emphasis is on the test and evaluation standards developed by the American National Standards Institute’s N42 committees. Commonalities among the standards are then reviewed as well as examples of unique aspects for specific equipment types. Throughout, sample test configurations and results from testing and evaluation at Oak Ridge National Laboratory are given. The article concludes with a brief discussion ofmore » typical tests and evaluations not covered by the N42 standards and some examples of test and evaluation that involve the end users of the equipment.« less
Testing and Evaluation of Passive Radiation Detection Equipment for Homeland Security
DOE Office of Scientific and Technical Information (OSTI.GOV)
West, David L.; Wood, Nathan L.; Forrester, Christina D.
This article is concerned with test and evaluation methods for passive radiation detection equipment used in homeland security applications. The different types of equipment used in these applications are briefly reviewed and then test and evaluation methods discussed. The primary emphasis is on the test and evaluation standards developed by the American National Standards Institute’s N42 committees. Commonalities among the standards are then reviewed as well as examples of unique aspects for specific equipment types. Throughout, sample test configurations and results from testing and evaluation at Oak Ridge National Laboratory are given. The article concludes with a brief discussion ofmore » typical tests and evaluations not covered by the N42 standards and some examples of test and evaluation that involve the end users of the equipment.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-12
... 135, Environmental Conditions and Test Procedures for Airborne Equipment AGENCY: Federal Aviation... 135, Environmental Conditions and Test Procedures for Airborne Equipment SUMMARY: The FAA is issuing..., Environmental Conditions and Test Procedures for Airborne Equipment DATES: The meeting will be held November 8...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-15
... 135, Environmental Conditions and Test Procedures for Airborne Equipment AGENCY: Federal Aviation... 135, Environmental Conditions and Test Procedures for Airborne Equipment. SUMMARY: The FAA is issuing..., Environmental Conditions and Test Procedures for Airborne Equipment. DATES: The meeting will be held April 19...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-22
... Committee 135, Environmental Conditions and Test Procedures for Airborne Equipment AGENCY: Federal Aviation... 135, Environmental Conditions and Test Procedures for Airborne Equipment. SUMMARY: The FAA is issuing..., Environmental Conditions and Test Procedures for Airborne Equipment. DATES: The meeting will be held November 13...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-04
... Committee 135, Environmental Conditions and Test Procedures for Airborne Equipment AGENCY: Federal Aviation... 135, Environmental Conditions and Test Procedures for Airborne Equipment. SUMMARY: The FAA is issuing..., Environmental Conditions and Test Procedures for Airborne Equipment. DATES: The meeting will be held March 21...
47 CFR 73.712 - Equipment tests.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 4 2011-10-01 2011-10-01 false Equipment tests. 73.712 Section 73.712... International Broadcast Stations § 73.712 Equipment tests. (a) During the process of construction of an... tests for the purpose of such adjustments and measurements as may be necessary to assure compliance with...
47 CFR 73.712 - Equipment tests.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 47 Telecommunication 4 2012-10-01 2012-10-01 false Equipment tests. 73.712 Section 73.712... International Broadcast Stations § 73.712 Equipment tests. (a) During the process of construction of an... tests for the purpose of such adjustments and measurements as may be necessary to assure compliance with...
29 CFR 1926.97 - Electrical protective equipment.
Code of Federal Regulations, 2014 CFR
2014-07-01
... glove. (2) Electrical requirements. (i) Equipment shall be capable of withstanding the ac proof-test voltage specified in Table E-1 or the dc proof-test voltage specified in Table E-2. (A) The proof test shall reliably indicate that the equipment can withstand the voltage involved. (B) The test voltage...
47 CFR 27.1164 - The cost-sharing formula.
Code of Federal Regulations, 2010 CFR
2010-10-01
... control equipment; engineering costs (design/path survey); installation; systems testing; FCC filing costs; site acquisition and civil works; zoning costs; training; disposal of old equipment; test equipment... a replacement system, such as equipment and engineering expenses. C may not exceed $250,000 per...
77 FR 9859 - Lifesaving Equipment: Production Testing and Harmonization With International Standards
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-21
... inflatable buoyant apparatuses may be certified using either occupant weight standard. Likewise, equipment...-AB46 Lifesaving Equipment: Production Testing and Harmonization With International Standards AGENCY... lifesaving equipment to harmonize Coast Guard regulations for inflatable liferafts and inflatable buoyant...
An overview of passenger equipment fullscale impact tests : results to date
DOT National Transportation Integrated Search
2001-11-25
As part of the Federal Railroad Administrations Equipment Safety Research Program, a series of full-scale impact tests are being conducted on rail passenger vehicles. Three tests are intended to define the performance of current-design equipment i...
33 CFR 150.510 - How must tested emergency equipment be operated?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 33 Navigation and Navigable Waters 2 2012-07-01 2012-07-01 false How must tested emergency equipment be operated? 150.510 Section 150.510 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF... Operational Tests and Inspections (general) § 150.510 How must tested emergency equipment be operated? The...
33 CFR 150.510 - How must tested emergency equipment be operated?
Code of Federal Regulations, 2014 CFR
2014-07-01
... 33 Navigation and Navigable Waters 2 2014-07-01 2014-07-01 false How must tested emergency equipment be operated? 150.510 Section 150.510 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF... Operational Tests and Inspections (general) § 150.510 How must tested emergency equipment be operated? The...
10 CFR 72.164 - Control of measuring and test equipment.
Code of Federal Regulations, 2010 CFR
2010-01-01
..., instruments, and other measuring and testing devices used in activities affecting quality are properly... WASTE Quality Assurance § 72.164 Control of measuring and test equipment. The licensee, applicant for a... 10 Energy 2 2010-01-01 2010-01-01 false Control of measuring and test equipment. 72.164 Section 72...
46 CFR 162.050-9 - Test report.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 6 2011-10-01 2011-10-01 false Test report. 162.050-9 Section 162.050-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL ENGINEERING EQUIPMENT Pollution Prevention Equipment § 162.050-9 Test report. (a) A report of approval testing must contain the...
Evaluation of the Steris Sensitive Equipment Decontamination (SED) Apparatus on a 463L Pallet
2007-09-01
to decontaminate representative articles of sensitive equipment and operationally relevant materials for biological-warfare agent surrogate... Articles of Sensitive Equipment .................................................................. 25 2.9 Sensitive Equipment Inspection...45 3.6.2 Test Article Initial Inspection .............................................................. 47 3.6.3 Test
Code of Federal Regulations, 2010 CFR
2010-10-01
....105 Substitutes for required fittings, material, apparatus, equipment, arrangements, calculations, and tests. (a) Where this subchapter requires a particular fitting, material, apparatus, equipment... satisfaction of the Commandant that the use of any particular equipment, apparatus, arrangement, or test is...
Code of Federal Regulations, 2011 CFR
2011-10-01
....105 Substitutes for required fittings, material, apparatus, equipment, arrangements, calculations, and tests. (a) Where this subchapter requires a particular fitting, material, apparatus, equipment... satisfaction of the Commandant that the use of any particular equipment, apparatus, arrangement, or test is...
15. INTERIOR VIEW TO THE NORTHEAST OF EQUIPMENT IN ROOM ...
15. INTERIOR VIEW TO THE NORTHEAST OF EQUIPMENT IN ROOM 4, EQUIPMENT AND GENERATOR ROOM, BUILDING 3113/3113A. - Nevada Test Site, Test Cell A Facility, Test Cell A Building & Addition, Area 25, Jackass Flats, Road F, Mercury, Nye County, NV
1991-08-01
insert various jamming signals. The criterion for classifying radio equipment under test is the quality of transferred information , that is the SINAD...UNCLASSFED) This report describes a test facility for measuring the behaviour and quality of radio communication equipment in a simulated operational...formation FEL has the disposal of a facility to test the quality of radio equipment in a simulated operational situation. (Y .. ,. -’ , / " " ’ TNO mppon 4
Management of Electronic Test Equipment. Volume 4. DoD Policy.
1986-07-01
sources of supply , the PIL should not mandate sole source dependenc . but rather limit the variety to a minimum of two items. To clarify the controversy...equipment/ supplies on-hand, equipment readiness, and training. The resource area C-ratings are based on stated criteria. The criteria for equipment...respectively). The UNITREP leaves it up to the Military Services whether to include test equipment in the equipment/ supplies on-hand resource area. Although
Nickel release from surgical instruments and operating room equipment.
Boyd, Anne H; Hylwa, Sara A
2018-04-15
Background There has been no systematic study assessing nickel release from surgical instruments and equipment used within the operating suite. This equipment represents important potential sources of exposure for nickel-sensitive patients and hospital staff. To investigate nickel release from commonly used surgical instruments and operating room equipment. Using the dimethylglyoxime nickel spot test, a variety of surgical instruments and operating room equipment were tested for nickel release at our institution. Of the 128 surgical instruments tested, only 1 was positive for nickel release. Of the 43 operating room items tested, 19 were positive for nickel release, 7 of which have the potential for direct contact with patients and/or hospital staff. Hospital systems should be aware of surgical instruments and operating room equipment as potential sources of nickel exposure.
48 CFR 9905.502-60 - Illustrations.
Code of Federal Regulations, 2012 CFR
2012-10-01
... for the same purpose: (1) An educational institution normally allocates special test equipment costs directly to contracts. The costs of general purpose test equipment are normally included in the indirect... of general purpose test equipment costs from the indirect cost pool to the contract, in addition to...
49 CFR 220.37 - Testing radio and wireless communication equipment.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 4 2011-10-01 2011-10-01 false Testing radio and wireless communication equipment... RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS Radio and Wireless Communication Procedures § 220.37 Testing radio and wireless communication equipment. (a) Each radio, and all...
49 CFR 220.37 - Testing radio and wireless communication equipment.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 4 2010-10-01 2010-10-01 false Testing radio and wireless communication equipment... RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS Radio and Wireless Communication Procedures § 220.37 Testing radio and wireless communication equipment. (a) Each radio, and all...
46 CFR 162.050-37 - Vibration test.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 6 2010-10-01 2010-10-01 false Vibration test. 162.050-37 Section 162.050-37 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL ENGINEERING EQUIPMENT Pollution Prevention Equipment § 162.050-37 Vibration test. (a...
Code of Federal Regulations, 2012 CFR
2012-07-01
... PROCEDURES Equipment, Fuel, and Gas Specifications § 1066.101 Overview. (a) This subpart addresses equipment related to emission testing, as well as test fuels and analytical gases. This section addresses emission sampling and analytical equipment, test fuels, and analytical gases. (b) The provisions of 40 CFR part 1065...
Code of Federal Regulations, 2013 CFR
2013-07-01
... PROCEDURES Equipment, Fuel, and Gas Specifications § 1066.101 Overview. (a) This subpart addresses equipment related to emission testing, as well as test fuels and analytical gases. This section addresses emission sampling and analytical equipment, test fuels, and analytical gases. (b) The provisions of 40 CFR part 1065...
49 CFR 220.37 - Testing radio and wireless communication equipment.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 49 Transportation 4 2013-10-01 2013-10-01 false Testing radio and wireless communication equipment... RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS Radio and Wireless Communication Procedures § 220.37 Testing radio and wireless communication equipment. (a) Each radio, and all...
49 CFR 220.37 - Testing radio and wireless communication equipment.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 49 Transportation 4 2014-10-01 2014-10-01 false Testing radio and wireless communication equipment... RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS Radio and Wireless Communication Procedures § 220.37 Testing radio and wireless communication equipment. (a) Each radio, and all...
49 CFR 220.37 - Testing radio and wireless communication equipment.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 49 Transportation 4 2012-10-01 2012-10-01 false Testing radio and wireless communication equipment... RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS Radio and Wireless Communication Procedures § 220.37 Testing radio and wireless communication equipment. (a) Each radio, and all...
Energy Systems Test Area (ESTA). Power Systems Test Facilities
NASA Technical Reports Server (NTRS)
Situ, Cindy H.
2010-01-01
This viewgraph presentation provides a detailed description of the Johnson Space Center's Power Systems Facility located in the Energy Systems Test Area (ESTA). Facilities and the resources used to support power and battery systems testing are also shown. The contents include: 1) Power Testing; 2) Power Test Equipment Capabilities Summary; 3) Source/Load; 4) Battery Facilities; 5) Battery Test Equipment Capabilities Summary; 6) Battery Testing; 7) Performance Test Equipment; 8) Battery Test Environments; 9) Battery Abuse Chambers; 10) Battery Abuse Capabilities; and 11) Battery Test Area Resources.
A guideline for heavy ion radiation testing for Single Event Upset (SEU)
NASA Technical Reports Server (NTRS)
Nichols, D. K.; Price, W. E.; Malone, C.
1984-01-01
A guideline for heavy ion radiation testing for single event upset was prepared to assist new experimenters in preparing and directing tests. How to estimate parts vulnerability and select an irradiation facility is described. A broad brush description of JPL equipment is given, certain necessary pre-test procedures are outlined and the roles and testing guidelines for on-site test personnel are indicated. Detailed descriptions of equipment needed to interface with JPL test crew and equipment are not provided, nor does it meet the more generalized and broader requirements of a MIL-STD document. A detailed equipment description is available upon request, and a MIL-STD document is in the early stages of preparation.
47 CFR 80.225 - Requirements for selective calling equipment.
Code of Federal Regulations, 2011 CFR
2011-10-01
... selective calling (DSC) equipment and selective calling equipment installed in ship and coast stations, and...-STD, “RTCM Recommended Minimum Standards for Digital Selective Calling (DSC) Equipment Providing... Class ‘D’ Digital Selective Calling (DSC)—Methods of testing and required test results,” March 2003. ITU...
46 CFR 133.45 - Tests and inspections of lifesaving equipment and arrangements.
Code of Federal Regulations, 2013 CFR
2013-10-01
... evacuation systems; (7) The ability of the crew to effectively carry out abandon-ship procedures; and (8) The... SUPPLY VESSELS LIFESAVING SYSTEMS General § 133.45 Tests and inspections of lifesaving equipment and..., buoyant apparatus, and associated equipment; (4) The proper condition of distress signaling equipment...
40 CFR 65.117 - Alternative means of emission limitation: Batch processes.
Code of Federal Regulations, 2010 CFR
2010-07-01
... (CONTINUED) AIR PROGRAMS (CONTINUED) CONSOLIDATED FEDERAL AIR RULE Equipment Leaks § 65.117 Alternative means... section provide the options of pressure testing or monitoring the equipment for leaks. The owner or... pressure-tested for leaks before regulated material is first fed to the equipment and the equipment is...
47 CFR 2.945 - Sampling tests of equipment compliance.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 47 Telecommunication 1 2012-10-01 2012-10-01 false Sampling tests of equipment compliance. 2.945 Section 2.945 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL FREQUENCY ALLOCATIONS AND RADIO TREATY MATTERS; GENERAL RULES AND REGULATIONS Equipment Authorization Procedures Conditions Attendant to An Equipment Authorization § 2.945...
46 CFR 133.45 - Tests and inspections of lifesaving equipment and arrangements.
Code of Federal Regulations, 2011 CFR
2011-10-01
... evacuation systems; (7) The ability of the crew to effectively carry out abandon-ship procedures; and (8) The... SUPPLY VESSELS LIFESAVING SYSTEMS General § 133.45 Tests and inspections of lifesaving equipment and..., buoyant apparatus, and associated equipment; (4) The proper condition of distress signaling equipment...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-31
... approval process for all lifesaving equipment required under the various vessel and facility regulations in... buoyant apparatuses. If the proposed rule is made final, all equipment approved after the effective date... Equipment: Production Testing and Harmonization With International Standards; Proposed Rule #0;#0;Federal...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 7 2011-10-01 2011-10-01 false Substitutes for required equipment, materials, apparatus... Operations General § 197.206 Substitutes for required equipment, materials, apparatus, arrangements, procedures, or tests. (a) The Coast Guard may accept substitutes for equipment, materials, apparatus...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 7 2010-10-01 2010-10-01 false Substitutes for required equipment, materials, apparatus... Operations General § 197.206 Substitutes for required equipment, materials, apparatus, arrangements, procedures, or tests. (a) The Coast Guard may accept substitutes for equipment, materials, apparatus...
47 CFR 74.13 - Equipment tests.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 47 Telecommunication 4 2014-10-01 2014-10-01 false Equipment tests. 74.13 Section 74.13 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES EXPERIMENTAL RADIO, AUXILIARY, SPECIAL BROADCAST AND OTHER PROGRAM DISTRIBUTIONAL SERVICES General; Rules Applicable to All Services in Part 74 § 74.13 Equipment tests. (...
47 CFR 73.712 - Equipment tests.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 47 Telecommunication 4 2014-10-01 2014-10-01 false Equipment tests. 73.712 Section 73.712 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES RADIO BROADCAST SERVICES International Broadcast Stations § 73.712 Equipment tests. (a) During the process of construction of an international broadcasting station, the...
48 CFR 245.608-5 - Special items screening.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Disposal of Contractor Inventory 245.608-5 Special items screening. (a) Special test equipment with standard components. (1) The contractor shall report any excess special test equipment (STE) using SF 1432, Inventory Schedule D (Special Tooling and Special Test Equipment). The contractor shall list and describe on...
47 CFR 2.1505 - Test instrumentation and equipment.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 1 2011-10-01 2011-10-01 false Test instrumentation and equipment. 2.1505... Position Indicating Radiobeacons (EPIRBs) General § 2.1505 Test instrumentation and equipment. (a) Receiver... peak measurements with a bandwidth of 100 kHz. (b) Spectrum analyzer. Spectral measurements are to be...
Code of Federal Regulations, 2014 CFR
2014-01-01
... SUCH CARRIAGE (ATP); INSPECTION, TESTING, AND CERTIFICATION OF SPECIAL EQUIPMENT Certification of Equipment in Service § 3300.76 General. Only domestic owners are eligible to receive U.S. ATP certificates... previously been certified: (1) For each unit of equipment, a test in a U.S. ATP testing station or in a...
Code of Federal Regulations, 2012 CFR
2012-01-01
... SUCH CARRIAGE (ATP); INSPECTION, TESTING, AND CERTIFICATION OF SPECIAL EQUIPMENT Certification of Equipment in Service § 3300.76 General. Only domestic owners are eligible to receive U.S. ATP certificates... previously been certified: (1) For each unit of equipment, a test in a U.S. ATP testing station or in a...
Code of Federal Regulations, 2010 CFR
2010-01-01
... SUCH CARRIAGE (ATP); INSPECTION, TESTING, AND CERTIFICATION OF SPECIAL EQUIPMENT Certification of Equipment in Service § 3300.76 General. Only domestic owners are eligible to receive U.S. ATP certificates... previously been certified: (1) For each unit of equipment, a test in a U.S. ATP testing station or in a...
Code of Federal Regulations, 2011 CFR
2011-01-01
... SUCH CARRIAGE (ATP); INSPECTION, TESTING, AND CERTIFICATION OF SPECIAL EQUIPMENT Certification of Equipment in Service § 3300.76 General. Only domestic owners are eligible to receive U.S. ATP certificates... previously been certified: (1) For each unit of equipment, a test in a U.S. ATP testing station or in a...
Code of Federal Regulations, 2013 CFR
2013-01-01
... SUCH CARRIAGE (ATP); INSPECTION, TESTING, AND CERTIFICATION OF SPECIAL EQUIPMENT Certification of Equipment in Service § 3300.76 General. Only domestic owners are eligible to receive U.S. ATP certificates... previously been certified: (1) For each unit of equipment, a test in a U.S. ATP testing station or in a...
47 CFR 73.1610 - Equipment tests.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 47 Telecommunication 4 2014-10-01 2014-10-01 false Equipment tests. 73.1610 Section 73.1610 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES RADIO BROADCAST SERVICES Rules Applicable to All Broadcast Stations § 73.1610 Equipment tests. (a) During the process of construction of a new broadcast station, the...
47 CFR 78.23 - Equipment tests.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 47 Telecommunication 4 2014-10-01 2014-10-01 false Equipment tests. 78.23 Section 78.23 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES CABLE TELEVISION RELAY SERVICE Applications and Licenses § 78.23 Equipment tests. (a) Following the grant of a CARS license, the licensee, during the process of...
46 CFR 133.45 - Tests and inspections of lifesaving equipment and arrangements.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Tests and inspections of lifesaving equipment and arrangements. 133.45 Section 133.45 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS LIFESAVING SYSTEMS General § 133.45 Tests and inspections of lifesaving equipment and...
46 CFR 133.45 - Tests and inspections of lifesaving equipment and arrangements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Tests and inspections of lifesaving equipment and arrangements. 133.45 Section 133.45 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS LIFESAVING SYSTEMS General § 133.45 Tests and inspections of lifesaving equipment and...
54. DETAIL OF GENERAL ELECTRIC AIRBORNE BEACON EQUIPMENT TEST SET ...
54. DETAIL OF GENERAL ELECTRIC AIRBORNE BEACON EQUIPMENT TEST SET (LEFT) AND ASSOCIATED GOULD BRUSH CHART RECORDERS (RIGHT). ELAPSED TIME COUNTER SITS ATOP AIRBORNE BEACON EQUIPMENT TEST SET. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
Lee, J B; Levy, M; Walker, A
2006-01-01
Using a Kastle-Meyer (KM) technique, the following equipment from the emergency departments of six UK hospitals (four trusts) and three regional ambulance services was tested for blood contamination: extrication ("spinal") boards, cervical collars, straps, box splints, head blocks, and headboards. Only equipment ready for patient use was tested. Over half of trauma equipment (57%) tested positive for blood, including 15% of equipment that was visibly stained with blood. There have been no recorded cases of infection from contaminated trauma equipment but our study has identified the potential risk. Disposable covers for boards, disposable straps, and disposable radiolucent head blocks which are currently available provide a solution but have resource implications.
... variability can occur due to differences in testing equipment, chemical reagents, and techniques. This is a reason ... healthcare practitioner's office? No. Porphyrin tests require specialized equipment and technical skills. Some tests may be performed ...
Humidity Testing for Human Rated Spacecraft
NASA Technical Reports Server (NTRS)
Johnson, Gary B.
2009-01-01
Determination that equipment can operate in and survive exposure to the humidity environments unique to human rated spacecraft presents widely varying challenges. Equipment may need to operate in habitable volumes where the atmosphere contains perspiration, exhalation, and residual moisture. Equipment located outside the pressurized volumes may be exposed to repetitive diurnal cycles that may result in moisture absorption and/or condensation. Equipment may be thermally affected by conduction to coldplate or structure, by forced or ambient air convection (hot/cold or wet/dry), or by radiation to space through windows or hatches. The equipment s on/off state also contributes to the equipment s susceptibility to humidity. Like-equipment is sometimes used in more than one location and under varying operational modes. Due to these challenges, developing a test scenario that bounds all physical, environmental and operational modes for both pressurized and unpressurized volumes requires an integrated assessment to determine the "worst-case combined conditions." Such an assessment was performed for the Constellation program, considering all of the aforementioned variables; and a test profile was developed based on approximately 300 variable combinations. The test profile has been vetted by several subject matter experts and partially validated by testing. Final testing to determine the efficacy of the test profile on actual space hardware is in the planning stages. When validation is completed, the test profile will be formally incorporated into NASA document CxP 30036, "Constellation Environmental Qualification and Acceptance Testing Requirements (CEQATR)."
Automatic Radiated Susceptibility Test System for Payload Equipment
NASA Technical Reports Server (NTRS)
Ngo, Hoai T.; Sturman, John C.; Sargent, Noel B.
1995-01-01
An automatic radiated susceptibility test system (ARSTS) was developed for NASA Lewis Research Center's Electro-magnetic Interference laboratory. According to MSFC-SPEC 521B, any electrical or electronic equipment that will be transported by the spacelab and space shuttle must be tested for susceptibility to electromagnetic interference. This state-of-the-art automatic test system performs necessary calculations; analyzes, processes, and records a great quantity of measured data; and monitors the equipment being tested in real-time and with minimal user intervention. ARSTS reduces costly test time, increases test accuracy, and provides reliable test results.
NASA Technical Reports Server (NTRS)
Maronde, R. G.
1980-01-01
The Ku-band test equipment, known as the Deliverable System Test equipment (DSTE), is reviewed and evaluated. The DSTE is semiautomated and computer programs were generated for 14 communication mode tests and 17 radar mode tests. The 31 test modules provide a good cross section of tests with which to exercise the Ku-band system; however, it is very limited when being used to verify Ku-band system performance. More detailed test descriptions are needed, and a major area of concern is the DSTE sell-off procedure which is inadequate.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-09
... Committee 135: Environmental Conditions and Test Procedures for Airborne Equipment AGENCY: Federal Aviation...: Environmental Conditions and Test Procedures for Airborne Equipment meeting. SUMMARY: The FAA is issuing this... Procedures for Airborne Equipment. DATES: The meeting will be held October 5-7, 2010, starting at 9 a.m...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-26
... Committee 135: Environmental Conditions and Test Procedures for Airborne Equipment AGENCY: Federal Aviation... Procedures for Airborne Equipment meeting. SUMMARY: The FAA is issuing this notice to advise the public of a meeting of RTCA Special Committee 135: Environmental Conditions and Test Procedures for Airborne Equipment...
46 CFR 159.007-9 - Production inspections and tests.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 6 2010-10-01 2010-10-01 false Production inspections and tests. 159.007-9 Section 159.007-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL APPROVAL OF EQUIPMENT AND MATERIALS Production Inspection and Tests of Approved Equipment and Materials §...
46 CFR 159.007-9 - Production inspections and tests.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 6 2011-10-01 2011-10-01 false Production inspections and tests. 159.007-9 Section 159.007-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL APPROVAL OF EQUIPMENT AND MATERIALS Production Inspection and Tests of Approved Equipment and Materials §...
46 CFR 159.007-13 - Production inspections and tests: Records.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 6 2011-10-01 2011-10-01 false Production inspections and tests: Records. 159.007-13 Section 159.007-13 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL APPROVAL OF EQUIPMENT AND MATERIALS Production Inspection and Tests of Approved Equipment and...
46 CFR 159.007-13 - Production inspections and tests: Records.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 6 2010-10-01 2010-10-01 false Production inspections and tests: Records. 159.007-13 Section 159.007-13 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL APPROVAL OF EQUIPMENT AND MATERIALS Production Inspection and Tests of Approved Equipment and...
46 CFR 159.007-11 - Production inspections and tests: Yearly report.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 6 2010-10-01 2010-10-01 false Production inspections and tests: Yearly report. 159.007-11 Section 159.007-11 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL APPROVAL OF EQUIPMENT AND MATERIALS Production Inspection and Tests of Approved Equipment an...
46 CFR 159.007-11 - Production inspections and tests: Yearly report.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 6 2011-10-01 2011-10-01 false Production inspections and tests: Yearly report. 159.007-11 Section 159.007-11 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL APPROVAL OF EQUIPMENT AND MATERIALS Production Inspection and Tests of Approved Equipment an...
Mobile Uninterruptible Power Supply
NASA Technical Reports Server (NTRS)
Mears, Robert L.
1990-01-01
Proposed mobile unit provides 20 kVA of uninterruptible power. Used with mobile secondary power-distribution centers to provide power to test equipment with minimal cabling, hazards, and obstacles. Wheeled close to test equipment and system being tested so only short cable connections needed. Quickly moved and set up in new location. Uninterruptible power supply intended for tests which data lost or equipment damaged during even transient power failure.
Built-In Diagnostics (BID) Of Equipment/Systems
NASA Technical Reports Server (NTRS)
Granieri, Michael N.; Giordano, John P.; Nolan, Mary E.
1995-01-01
Diagnostician(TM)-on-Chip (DOC) technology identifies faults and commands systems reconfiguration. Smart microcontrollers operating in conjunction with other system-control circuits, command self-correcting system/equipment actions in real time. DOC microcontroller generates commands for associated built-in test equipment to stimulate unit of equipment diagnosed, collects and processes response data obtained by built-in test equipment, and performs diagnostic reasoning on response data, using diagnostic knowledge base derived from design data.
Hall, Lawrence B.
1955-01-01
The new demands placed upon application equipment by the introduction of modern insecticides have revealed the deficiencies of this equipment when required for continuous use on a large scale. If adequate equipment is to be produced, specifications must be based not only on basic materials tests but also on “use” tests, in which the conditions of field use are simulated. The author outlines suggested techniques to be followed and standards to be adopted in testing the performance of compression sprayers and allied equipment, with reference to the following features: compression-sprayer tank fatigue; tank impact; pump resistance to bursting; pump resistance to collapse; pump friction; cut-off valve durability; constant-pressure valves; cut-off valve actuation; hose flexure; hose tension and bursting-pressure; hose friction; gaskets, valve faces, and similar non-metallic parts; nozzle-orifice erosion; and nozzle pattern. ImagesFIG. 1FIG. 14FIG. 20 PMID:14364189
NASA Technical Reports Server (NTRS)
Farmer, N. B.
1974-01-01
Development flight instrumentation was delivered for 25 Apollo vehicles as Government-furnished equipment. The problems and philosophies of an activity that was concerned with supplying telemetry equipment to a space-flight test program are discussed. Equipment delivery dates, system-design details, and flight-performance information for each mission also are included.
Lee, J B; Levy, M; Walker, A
2006-01-01
Using a Kastle‐Meyer (KM) technique, the following equipment from the emergency departments of six UK hospitals (four trusts) and three regional ambulance services was tested for blood contamination: extrication (“spinal”) boards, cervical collars, straps, box splints, head blocks, and headboards. Only equipment ready for patient use was tested. Over half of trauma equipment (57%) tested positive for blood, including 15% of equipment that was visibly stained with blood. There have been no recorded cases of infection from contaminated trauma equipment but our study has identified the potential risk. Disposable covers for boards, disposable straps, and disposable radiolucent head blocks which are currently available provide a solution but have resource implications PMID:16373813
Test results: Halon 1301 versus water sprinkler fire protection for essential electronic equipment
NASA Astrophysics Data System (ADS)
Reichelt, E. F.; Walker, J. L.; Vickers, R. N.; Kwan, A. J.
1982-07-01
This report describes results of testing two contending extinguishants, Halon 1301 and water, for fire protection of essential electronic equipment. A series of controlled fires in a facility housing an operational electronic data processing system sought to establish immediate and long term effects of exposure of sensitive electronic equipment and stored data to fire extinguishment atmospheres. Test results lead to the conclusion that Halon 1301 is superior to water as an extinguishant for fires occurring in essential electronic equipment installations.
Mobile phone interference with medical equipment and its clinical relevance: a systematic review.
Lawrentschuk, Nathan; Bolton, Damien M
2004-08-02
To conduct a systematic review of studies on clinically relevant digital mobile phone electromagnetic interference with medical equipment. MEDLINE and SUMSEARCH were searched for the period 1966-2004. The Cochrane Library and Database of Abstracts of Reviews of Effects were also searched for systematic reviews. Studies were eligible if published in a peer-reviewed journal in English, and if they included testing of digital mobile phones for clinically relevant interference with medical equipment used to monitor or treat patients, but not implantable medical devices. As there was considerable heterogeneity in medical equipment studied and the conduct of testing, results were summarised rather than subjected to meta-analysis. Clinically relevant electromagnetic interference (EMI) secondary to mobile phones potentially endangering patients occurred in 45 of 479 devices tested at 900 MHz and 14 of 457 devices tested at 1800 MHz. However, in the largest studies, the prevalence of clinically relevant EMI was low. Most clinically relevant EMI occurred when mobile phones were used within 1 m of medical equipment. Although testing was not standardised between studies and equipment tested was not identical, it is of concern that at least 4% of devices tested in any study were susceptible to clinically relevant EMI. All studies recommend some type of restriction of mobile phone use in hospitals, with use greater than 1 m from equipment and restrictions in clinical areas being the most common.
Use of medical and dental X-ray equipment for nondestructive testing
NASA Technical Reports Server (NTRS)
1969-01-01
Industrial X ray equipment is used for nondestructive testing to detect defects in metal joints, electrical terminal blocks, sealed assemblies, and other hardware. Medical and dental X ray equipment is also used for hardware troubleshooting.
Massambu, Charles; Mwangi, Christina
2009-06-01
The rapid scale-up of the care and treatment programs in Tanzania during the preceding 4 years has greatly increased the demand for quality laboratory services for diagnosis of HIV and monitoring patients during antiretroviral therapy. Laboratory services were not in a position to cope with this demand owing to poor infrastructure, lack of human resources, erratic and/or lack of reagent supply and commodities, and slow manual technologies. With the limited human resources in the laboratory and the need for scaling up the care and treatment program, it became necessary to install automated equipment and train personnel for the increased volume of testing and new tests across all laboratory levels. With the numerous partners procuring equipment, the possibility of a multitude of equipment platforms with attendant challenges for procurement of reagents, maintenance of equipment, and quality assurance arose. Tanzania, therefore, had to harmonize laboratory tests and standardize laboratory equipment at different levels of the laboratory network. The process of harmonization of tests and standardization of equipment included assessment of laboratories, review of guidelines, development of a national laboratory operational plan, and stakeholder advocacy. This document outlines this process.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-26
... Committee 135, Environmental Conditions and Test Procedures for Airborne Equipment AGENCY: Federal Aviation...: Environmental Conditions and Test Procedures for Airborne Equipment. SUMMARY: The FAA is issuing this notice to... Procedures for Airborne Equipment DATES: The meeting will be held October 20, 2011 from 9 a.m.-5 p.m...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-20
... Committee 135, Environmental Conditions and Test Procedures for Airborne Equipment AGENCY: Federal Aviation...: Environmental Conditions and Test Procedures for Airborne Equipment. SUMMARY: The FAA is issuing this notice to... Procedures for Airborne Equipment. DATES: The meeting will be held May 11-12, 2011 from 9 a.m.-5 p.m...
Code of Federal Regulations, 2013 CFR
2013-07-01
... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Quality control test methods, equipment, and... USE WITH DIRECT CURRENT IN PROVIDING SHORT-CIRCUIT PROTECTION FOR TRAILING CABLES IN COAL MINES Quality Control § 28.33 Quality control test methods, equipment, and records; review by MSHA; revocation...
Code of Federal Regulations, 2012 CFR
2012-07-01
... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Quality control test methods, equipment, and... USE WITH DIRECT CURRENT IN PROVIDING SHORT-CIRCUIT PROTECTION FOR TRAILING CABLES IN COAL MINES Quality Control § 28.33 Quality control test methods, equipment, and records; review by MSHA; revocation...
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Quality control test methods, equipment, and... USE WITH DIRECT CURRENT IN PROVIDING SHORT-CIRCUIT PROTECTION FOR TRAILING CABLES IN COAL MINES Quality Control § 28.33 Quality control test methods, equipment, and records; review by MSHA; revocation...
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Quality control test methods, equipment, and... USE WITH DIRECT CURRENT IN PROVIDING SHORT-CIRCUIT PROTECTION FOR TRAILING CABLES IN COAL MINES Quality Control § 28.33 Quality control test methods, equipment, and records; review by MSHA; revocation...
Code of Federal Regulations, 2014 CFR
2014-07-01
... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Quality control test methods, equipment, and... USE WITH DIRECT CURRENT IN PROVIDING SHORT-CIRCUIT PROTECTION FOR TRAILING CABLES IN COAL MINES Quality Control § 28.33 Quality control test methods, equipment, and records; review by MSHA; revocation...
Comparative tests of bench equipment for fuel control system testing of gas-turbine engine
NASA Astrophysics Data System (ADS)
Shendaleva, E. V.
2018-04-01
The relevance of interlaboratory comparative researches is confirmed by attention of world metrological community to this field of activity. Use of the interlaboratory comparative research methodology not only for single gages collation, but also for bench equipment complexes, such as modeling stands for fuel control system testing of gas-turbine engine, is offered. In this case a comparative measure of different bench equipment will be the control fuel pump. Ensuring traceability of measuring result received at test benches of various air enterprises, development and introduction of national standards to practice of bench tests and, eventually, improvement of quality and safety of a aircraft equipment is result of this approach.
SP-100 ground engineering system test site description and progress update
NASA Astrophysics Data System (ADS)
Baxter, William F.; Burchell, Gail P.; Fitzgibbon, Davis G.; Swita, Walter R.
1991-01-01
The SP-100 Ground Engineering System Test Site will provide the facilities for the testing of an SP-100 reactor, which is technically prototypic of the generic design for producing 100 kilowatts of electricity. This effort is part of the program to develop a compact, space-based power system capable of producing several hundred kilowatts of electrical power. The test site is located on the U.S. Department of Energy's Hanford Site near Richland, Washington. The site is minimizing capital equipment costs by utilizing existing facilities and equipment to the maximum extent possible. The test cell is located in a decommissioned reactor containment building, and the secondary sodium cooling loop will use equipment from the Fast Flux Test Facility plant which has never been put into service. Modifications to the facility and special equipment are needed to accommodate the testing of the SP-100 reactor. Definitive design of the Ground Engineering System Test Site facility modifications and systems is in progress. The design of the test facility and the testing equipment will comply with the regulations and specifications of the U.S. Department of Energy and the State of Washington.
2016-09-15
METHODOLOGY INVESTIGATION: COMPARISON OF LIVE FIRE AND WEAPON SIMULATOR TEST METHODOLOGIES AND THE EFFECTS OF CLOTHING AND INDIVIDUAL EQUIPMENT ON...2. REPORT TYPE Final 3. DATES COVERED (From - To) October 2014 – August 2015 4. TITLE AND SUBTITLE WEAPON SIMULATOR TEST METHODOLOGY INVESTIGATION...COMPARISON OF LIVE FIRE AND WEAPON SIMULATOR TEST METHODOLOGIES AND THE EFFECTS OF CLOTHING AND INDIVIDUAL EQUIPMENT ON MARKSMANSHIP 5a. CONTRACT
The test facility for the short prototypes of the LHC superconducting magnets
NASA Astrophysics Data System (ADS)
Delsolaro, W. Venturini; Arn, A.; Bottura, L.; Giloux, C.; Mompo, R.; Siemko, A.; Walckiers, L.
2002-05-01
The LHC development program relies on cryogenic tests of prototype and model magnets. This vigorous program is pursued in a dedicated test facility based on several vertical cryostats working at superfluid helium temperatures. The performance of the facility is detailed. Goals and test equipment for currently performed studies are reviewed: quench analysis and magnet protection studies, measurement of the field quality, test of ancillary electrical equipment like diodes and busbars. The paper covers the equipment available for tests of prototypes and some special series of LHC magnets to come.
49 CFR 238.15 - Movement of passenger equipment with power brake defects.
Code of Federal Regulations, 2011 CFR
2011-10-01
... passenger equipment containing a power brake defect at the time a Class I or IA brake test is performed... route after a Class I or IA brake test was performed), a commuter or passenger train that has in its consist passenger equipment containing a power brake defect at the time that a Class I or IA brake test...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Neymark, J.; Kennedy, M.; Judkoff, R.
This report documents a set of diagnostic analytical verification cases for testing the ability of whole building simulation software to model the air distribution side of typical heating, ventilating and air conditioning (HVAC) equipment. These cases complement the unitary equipment cases included in American National Standards Institute (ANSI)/American Society of Heating, Refrigerating, and Air-Conditioning Engineers (ASHRAE) Standard 140, Standard Method of Test for the Evaluation of Building Energy Analysis Computer Programs, which test the ability to model the heat-transfer fluid side of HVAC equipment.
The Importance of Play: Part Two
ERIC Educational Resources Information Center
Exceptional Parent, 2008
2008-01-01
The International Playground Equipment Manufacturers Association (IPEMA) is a non-profit membership association of playground equipment and surfacing companies. IPEMA's primary mission is to provide playground equipment and surfacing with independently tested safety certification to meet American Society for Testing and Materials (ASTM) standards…
40 CFR 1068.210 - What are the provisions for exempting test engines/equipment?
Code of Federal Regulations, 2010 CFR
2010-07-01
... exempt engines/equipment that you will use for research, investigations, studies, demonstrations, or... test engines/equipment? 1068.210 Section 1068.210 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR POLLUTION CONTROLS GENERAL COMPLIANCE PROVISIONS FOR ENGINE PROGRAMS Exemptions...
40 CFR 1068.210 - What are the provisions for exempting test engines/equipment?
Code of Federal Regulations, 2011 CFR
2011-07-01
... exempt engines/equipment that you will use for research, investigations, studies, demonstrations, or... test engines/equipment? 1068.210 Section 1068.210 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR POLLUTION CONTROLS GENERAL COMPLIANCE PROVISIONS FOR ENGINE PROGRAMS Exemptions...
A train-to-train impact test of crash energy management passenger rail equipment
DOT National Transportation Integrated Search
2006-12-04
This paper gives an overview of the in-line full-scale impact tests conducted by the Federal : Railroad Administration and discusses a strategy for preventing override between colliding : equipment. Override of the impacting equipment during a passen...
Space Shuttle SRM development. [Solid Rocket Motors
NASA Technical Reports Server (NTRS)
Brinton, B. C.; Kilminster, J. C.
1979-01-01
The successful static test of the fourth Development Space Shuttle Solid Rocket Motor (SRM) in February 1979 concluded the development testing phase of the SRM Project. Qualification and flight motors are currently being fabricated, with the first qualification motor to be static tested. Delivered thrust-time traces on all development motors were very close to predicted values, and both specific and total impulse exceeded specification requirements. 'All-up' static tests conducted with a solid rocket booster equipment on development motors achieved all test objectives. Transportation and support equipment concepts have been proven, baselining is complete, and component reusability has been demonstrated. Evolution of the SRM transportation support equipment, and special test equipment designs are reviewed, and development activities discussed. Handling and processing aspects of large, heavy components are described.
Mariner Mars 1971 science operational support equipment
NASA Technical Reports Server (NTRS)
1971-01-01
The Mariner Mars 1971 science operational support equipment (SOSE) was developed to support the checkout of the proof test model and flight spacecraft. The test objectives of the SOSE and how these objectives were implemented are discussed. Attention is focused on the computer portion of the SOSE, since incorporation of a computer in ground checkout equipment represents a major departure from the support equipment concepts previously used. A functional description of the major hardware elements contained in the SOSE is also included, along with the operational performance of the SOSE during spacecraft testing.
40 CFR 51.358 - Test equipment.
Code of Federal Regulations, 2013 CFR
2013-07-01
... vehicle description, including license plate number, vehicle identification number, and odometer reading... emissions test on subject vehicles. (a) Performance features of computerized emission test systems. The...) Emission test equipment shall be capable of testing all subject vehicles and shall be updated from time to...
40 CFR 51.358 - Test equipment.
Code of Federal Regulations, 2011 CFR
2011-07-01
... vehicle description, including license plate number, vehicle identification number, and odometer reading... emissions test on subject vehicles. (a) Performance features of computerized emission test systems. The...) Emission test equipment shall be capable of testing all subject vehicles and shall be updated from time to...
40 CFR 51.358 - Test equipment.
Code of Federal Regulations, 2012 CFR
2012-07-01
... vehicle description, including license plate number, vehicle identification number, and odometer reading... emissions test on subject vehicles. (a) Performance features of computerized emission test systems. The...) Emission test equipment shall be capable of testing all subject vehicles and shall be updated from time to...
Space processing applications payload equipment study. Volume 2E: Commercial equipment utility
NASA Technical Reports Server (NTRS)
Smith, A. G. (Editor)
1974-01-01
Examination of commercial equipment technologies revealed that the functional performance requirements of space processing equipment could generally be met by state-of-the-art design practices. Thus, an apparatus could be evolved from a standard item or derived by custom design using present technologies. About 15 percent of the equipment needed has no analogous commercial base of derivation and requires special development. This equipment is involved primarily with contactless heating and position control. The derivation of payloads using commercial equipment sources provides a broad and potentially cost-effective base upon which to draw. The derivation of payload equipment from commercial technologies poses other issues beyond that of the identifiable functional performance, but preliminary results on testing of selected equipment testing appear quite favorable. During this phase of the SPA study, several aspects of commercial equipment utility were assessed and considered. These included safety, packaging and structural, power conditioning (electrical/electronic), thermal and materials of construction.
42 CFR 493.1254 - Standard: Maintenance and function checks.
Code of Federal Regulations, 2011 CFR
2011-10-01
... ensures equipment, instrument, and test system performance that is necessary for accurate and reliable... equipment, instrument, and test system performance that is necessary for accurate and reliable test results...
... for Targeted Cancer Therapy Glucose Tests Gonorrhea Testing Gram Stain Growth Hormone Haptoglobin hCG Pregnancy hCG Tumor Marker ... can I vary it between 50 and 150 grams? You should ... has the proper stain and equipment. The quantitative test requires specialized equipment; ...
30 CFR 18.69 - Adequacy tests.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Adequacy tests. 18.69 Section 18.69 Mineral... MINING PRODUCTS ELECTRIC MOTOR-DRIVEN MINE EQUIPMENT AND ACCESSORIES Inspections and Tests § 18.69 Adequacy tests. MSHA reserves the right to conduct appropriate test(s) to verify the adequacy of equipment...
30 CFR 18.69 - Adequacy tests.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Adequacy tests. 18.69 Section 18.69 Mineral... MINING PRODUCTS ELECTRIC MOTOR-DRIVEN MINE EQUIPMENT AND ACCESSORIES Inspections and Tests § 18.69 Adequacy tests. MSHA reserves the right to conduct appropriate test(s) to verify the adequacy of equipment...
30 CFR 18.69 - Adequacy tests.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Adequacy tests. 18.69 Section 18.69 Mineral... MINING PRODUCTS ELECTRIC MOTOR-DRIVEN MINE EQUIPMENT AND ACCESSORIES Inspections and Tests § 18.69 Adequacy tests. MSHA reserves the right to conduct appropriate test(s) to verify the adequacy of equipment...
Satellite Vibration Testing: Angle optimisation method to Reduce Overtesting
NASA Astrophysics Data System (ADS)
Knight, Charly; Remedia, Marcello; Aglietti, Guglielmo S.; Richardson, Guy
2018-06-01
Spacecraft overtesting is a long running problem, and the main focus of most attempts to reduce it has been to adjust the base vibration input (i.e. notching). Instead this paper examines testing alternatives for secondary structures (equipment) coupled to the main structure (satellite) when they are tested separately. Even if the vibration source is applied along one of the orthogonal axes at the base of the coupled system (satellite plus equipment), the dynamics of the system and potentially the interface configuration mean the vibration at the interface may not occur all along one axis much less the corresponding orthogonal axis of the base excitation. This paper proposes an alternative testing methodology in which the testing of a piece of equipment occurs at an offset angle. This Angle Optimisation method may have multiple tests but each with an altered input direction allowing for the best match between all specified equipment system responses with coupled system tests. An optimisation process that compares the calculated equipment RMS values for a range of inputs with the maximum coupled system RMS values, and is used to find the optimal testing configuration for the given parameters. A case study was performed to find the best testing angles to match the acceleration responses of the centre of mass and sum of interface forces for all three axes, as well as the von Mises stress for an element by a fastening point. The angle optimisation method resulted in RMS values and PSD responses that were much closer to the coupled system when compared with traditional testing. The optimum testing configuration resulted in an overall average error significantly smaller than the traditional method. Crucially, this case study shows that the optimum test campaign could be a single equipment level test opposed to the traditional three orthogonal direction tests.
46 CFR 160.062-8 - Procedures for acceptance of testing facility.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 6 2011-10-01 2011-10-01 false Procedures for acceptance of testing facility. 160.062-8 Section 160.062-8 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Releases. Lifesaving Equipment...
46 CFR 162.050-35 - Bilge alarm: Approval tests.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 6 2010-10-01 2010-10-01 false Bilge alarm: Approval tests. 162.050-35 Section 162.050-35 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL ENGINEERING EQUIPMENT Pollution Prevention Equipment § 162.050-35...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Thacker, G.W.
1996-01-27
This quarterly report describes work on Task 1: Field test and sell prototype to Ellis Equipment, Ltd; Task 2: Design, build, and field test two prototypes; and Task 3: Produce and sell Pegasus to farmers. The equipment has been built to shred stalks, deeply till the soil, and prepare seedbeds for cotton plants. The equipment has been field tested in Australia and is currently being field tested in California and Arizona. Unexpected problems appeared with hard dry soils and this report describes improvements made.
Code of Federal Regulations, 2014 CFR
2014-07-01
.... Front-end loaders shall be tested with the loader bucket empty. Equipment shall not be tested when... equipment which is designed for the power train to be disengaged during braking. (v) Testing speeds shall be...
Code of Federal Regulations, 2013 CFR
2013-07-01
.... Front-end loaders shall be tested with the loader bucket empty. Equipment shall not be tested when... equipment which is designed for the power train to be disengaged during braking. (v) Testing speeds shall be...
Code of Federal Regulations, 2011 CFR
2011-07-01
.... Front-end loaders shall be tested with the loader bucket empty. Equipment shall not be tested when... equipment which is designed for the power train to be disengaged during braking. (v) Testing speeds shall be...
Code of Federal Regulations, 2012 CFR
2012-07-01
.... Front-end loaders shall be tested with the loader bucket empty. Equipment shall not be tested when... equipment which is designed for the power train to be disengaged during braking. (v) Testing speeds shall be...
The new Section 23 of DO160C/ED14C lightning testing of externally mounted electrical equipment
NASA Astrophysics Data System (ADS)
Burrows, B. J. C.
1991-08-01
The new Section 23 is introduced which has only very recently been fully approved by the RTCA for incorporation into the first revision of DO160C/ED14C. Full threat lightning direct effects testing of equipment is entirely new to DO160, the only existing lightning testing is transient testing for LRU's (Line Replaceable Units) by pin or cable bundle injection methods, for equipment entirely contained within the airframe and assumed to be unaffected by direct effects. This testing required transients of very low amplitude compared with lightning itself, whereas the tests now to be described involve full threat lightning testing, that is using the previously established severe parameters of lightning appropriate to the Zone, such as 200 kA for Zone 1A as in AC20-136. Direct effects (i.e., damage) testing involves normally the lightning current arc attaching to the object under test (or very near to it) so submitting it to full potential for the electric, mechanical, thermal and shock damage which is caused by high current arcing. Since equipment for any part of the airframe require qualification, tests to demonstrate safety of equipment in fuel vapor regions of the airframe are also included.
46 CFR 162.050-19 - Oil content meter and bilge alarm test rig.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 6 2010-10-01 2010-10-01 false Oil content meter and bilge alarm test rig. 162.050-19 Section 162.050-19 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL ENGINEERING EQUIPMENT Pollution Prevention Equipment...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-31
... for interim waiver; and (4) DOE rulemakings and waivers regarding commercial refrigeration equipment... authority to establish and amend test procedures for commercial refrigeration equipment. On December 8, 2006, DOE published a final rule adopting test procedures for commercial refrigeration equipment, effective...
30 CFR 77.502-2 - Electric equipment; frequency of examination and testing.
Code of Federal Regulations, 2010 CFR
2010-07-01
... and testing. 77.502-2 Section 77.502-2 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND COAL MINES Electrical Equipment-General § 77.502-2 Electric equipment...
Code of Federal Regulations, 2014 CFR
2014-07-01
... particular piece of equipment. Front-end loaders shall be tested with the loader bucket empty. Equipment... speed the equipment is traveling except for equipment which is designed for the power train to be...
Code of Federal Regulations, 2011 CFR
2011-07-01
... particular piece of equipment. Front-end loaders shall be tested with the loader bucket empty. Equipment... speed the equipment is traveling except for equipment which is designed for the power train to be...
Code of Federal Regulations, 2013 CFR
2013-07-01
... particular piece of equipment. Front-end loaders shall be tested with the loader bucket empty. Equipment... speed the equipment is traveling except for equipment which is designed for the power train to be...
Code of Federal Regulations, 2012 CFR
2012-07-01
... particular piece of equipment. Front-end loaders shall be tested with the loader bucket empty. Equipment... speed the equipment is traveling except for equipment which is designed for the power train to be...
DOE Office of Scientific and Technical Information (OSTI.GOV)
J. Cunningham and J. Shank
2004-11-01
To continue meeting safety and reliability requirements while controlling costs, operators of nuclear power plants must be able to replace and upgrade equipment in a cost-effective manner. One issue that has been problematic for new plant equipment and especially for digital instrumentation and control (I&C) systems in recent years is electromagnetic compatibility (EMC). The EMC issue usually involves testing to show that critical equipment will not be adversely affected by electromagnetic interference (EMI) in the plant environment. This guide will help nuclear plant engineers address EMC issues and qualification testing in a consistent, comprehensive manner.
14 CFR 29.1363 - Electrical system tests.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Electrical system tests. 29.1363 Section 29... AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Equipment Electrical Systems and Equipment § 29.1363 Electrical system tests. (a) When laboratory tests of the electrical system are conducted— (1) The tests must...
14 CFR 25.1363 - Electrical system tests.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Electrical system tests. 25.1363 Section 25... AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Equipment Electrical Systems and Equipment § 25.1363 Electrical system tests. (a) When laboratory tests of the electrical system are conducted— (1) The tests must...
14 CFR 25.1363 - Electrical system tests.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Electrical system tests. 25.1363 Section 25... AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Equipment Electrical Systems and Equipment § 25.1363 Electrical system tests. (a) When laboratory tests of the electrical system are conducted— (1) The tests must...
14 CFR 29.1363 - Electrical system tests.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Electrical system tests. 29.1363 Section 29... AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Equipment Electrical Systems and Equipment § 29.1363 Electrical system tests. (a) When laboratory tests of the electrical system are conducted— (1) The tests must...
14 CFR 25.1363 - Electrical system tests.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Electrical system tests. 25.1363 Section 25... AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Equipment Electrical Systems and Equipment § 25.1363 Electrical system tests. (a) When laboratory tests of the electrical system are conducted— (1) The tests must...
14 CFR 29.1363 - Electrical system tests.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Electrical system tests. 29.1363 Section 29... AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Equipment Electrical Systems and Equipment § 29.1363 Electrical system tests. (a) When laboratory tests of the electrical system are conducted— (1) The tests must...
14 CFR 25.1363 - Electrical system tests.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Electrical system tests. 25.1363 Section 25... AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Equipment Electrical Systems and Equipment § 25.1363 Electrical system tests. (a) When laboratory tests of the electrical system are conducted— (1) The tests must...
14 CFR 29.1363 - Electrical system tests.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Electrical system tests. 29.1363 Section 29... AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Equipment Electrical Systems and Equipment § 29.1363 Electrical system tests. (a) When laboratory tests of the electrical system are conducted— (1) The tests must...
10. INTERIOR VIEW TO THE SOUTHEAST OF INSTRUMENTS AND EQUIPMENT ...
10. INTERIOR VIEW TO THE SOUTHEAST OF INSTRUMENTS AND EQUIPMENT IN ROOM 1. - Nevada Test Site, Test Cell A Facility, Test Cell A Building & Addition, Area 25, Jackass Flats, Road F, Mercury, Nye County, NV
13. ENGINE TEST CELL BUILDING INTERIOR. EQUIPMENT ROOM SERVING CELLS ...
13. ENGINE TEST CELL BUILDING INTERIOR. EQUIPMENT ROOM SERVING CELLS 2 AND 4. LOOKING SOUTHEAST. - Fairchild Air Force Base, Engine Test Cell Building, Near intersection of Arnold Street & George Avenue, Spokane, Spokane County, WA
11. INTERIOR VIEW TO THE SOUTH OF INSTRUMENTS AND EQUIPMENT ...
11. INTERIOR VIEW TO THE SOUTH OF INSTRUMENTS AND EQUIPMENT IN ROOM 1. - Nevada Test Site, Test Cell A Facility, Test Cell A Building & Addition, Area 25, Jackass Flats, Road F, Mercury, Nye County, NV
40 CFR 267.33 - What are the testing and maintenance requirements for the equipment?
Code of Federal Regulations, 2010 CFR
2010-07-01
... OPERATING UNDER A STANDARDIZED PERMIT Preparedness and Prevention § 267.33 What are the testing and maintenance requirements for the equipment? You must test and maintain all required facility communications or...
40 CFR 267.33 - What are the testing and maintenance requirements for the equipment?
Code of Federal Regulations, 2014 CFR
2014-07-01
... OPERATING UNDER A STANDARDIZED PERMIT Preparedness and Prevention § 267.33 What are the testing and maintenance requirements for the equipment? You must test and maintain all required facility communications or...
40 CFR 267.33 - What are the testing and maintenance requirements for the equipment?
Code of Federal Regulations, 2013 CFR
2013-07-01
... OPERATING UNDER A STANDARDIZED PERMIT Preparedness and Prevention § 267.33 What are the testing and maintenance requirements for the equipment? You must test and maintain all required facility communications or...
40 CFR 267.33 - What are the testing and maintenance requirements for the equipment?
Code of Federal Regulations, 2012 CFR
2012-07-01
... OPERATING UNDER A STANDARDIZED PERMIT Preparedness and Prevention § 267.33 What are the testing and maintenance requirements for the equipment? You must test and maintain all required facility communications or...
40 CFR 267.33 - What are the testing and maintenance requirements for the equipment?
Code of Federal Regulations, 2011 CFR
2011-07-01
... OPERATING UNDER A STANDARDIZED PERMIT Preparedness and Prevention § 267.33 What are the testing and maintenance requirements for the equipment? You must test and maintain all required facility communications or...
1979-02-01
A 0 ’A099 7 1 3 tAU N A E R O S P A C E C O R P B E T H P A G E N Y F / 6 ~ ~ i DEVELOPMENT OF ENVIRONMENTAL. PROFILES FOR TESTING EQUIPMENT...IHIlia- ’ -Q IIIII.L25 MICROCOPY RESOLUTION’ TEST CHART C RMS-9-R-1 DEVELOPMENT OF ENVIRONMENTAL PROFILES FOR TESTING EQUIPMENT INSTALLED IN NAVAL... Development of Environmental Profiles for Testing ,’~ Final j quipment Installed in Naval Aircraft (Fixed Wing), e 7- e* 8 S. PERFORMING ORGANIZATION
Standards for material handling and facilities equipment proofload testing
NASA Technical Reports Server (NTRS)
Bonn, S. P.
1970-01-01
Document provides information on verifying the safety of material handling and facilities equipment /MH/FE/, ranging from monorail systems to ladders and non-powered mobile equipment. Seven catagories of MH/FE equipment are defined.
NASA Technical Reports Server (NTRS)
Carts, M. A.; Marshall, P. W.; Reed, R.; Curie, S.; Randall, B.; LaBel, K.; Gilbert, B.; Daniel, E.
2006-01-01
Serial Bit Error Rate Testing under radiation to characterize single particle induced errors in high-speed IC technologies generally involves specialized test equipment common to the telecommunications industry. As bit rates increase, testing is complicated by the rapidly increasing cost of equipment able to test at-speed. Furthermore as rates extend into the tens of billions of bits per second test equipment ceases to be broadband, a distinct disadvantage for exploring SEE mechanisms in the target technologies. In this presentation the authors detail the testing accomplished in the CREST project and apply the knowledge gained to establish a set of guidelines suitable for designing arbitrarily high speed radiation effects tests.
NASA Technical Reports Server (NTRS)
Irvine, R. B.; Vanalstine, R.
1977-01-01
The power spectral noise characteristic performance of the Teledyne two-degree-of-freedom dry tuned gimbal gyroscope was determined. Tests were conducted using a current configuration SDG-5 gyro in conjunction with test equipment with minor modification. Long term bias stability tests were conducted as well as some first difference performance tests. The gyro, test equipment, and the tests performed are described. Results are presented.
40 CFR Appendix A to Subpart S of... - Calibrations, Adjustments and Quality Control
Code of Federal Regulations, 2012 CFR
2012-07-01
... average of the pre-test and post-test ambient background levels shall be compared to the permissible...—Calibrations, Adjustments and Quality Control (I) Steady-State Test Equipment States may opt to use transient emission test equipment for steady-state tests and follow the quality control requirements in paragraph (II...
40 CFR Appendix A to Subpart S of... - Calibrations, Adjustments and Quality Control
Code of Federal Regulations, 2010 CFR
2010-07-01
... average of the pre-test and post-test ambient background levels shall be compared to the permissible...—Calibrations, Adjustments and Quality Control (I) Steady-State Test Equipment States may opt to use transient emission test equipment for steady-state tests and follow the quality control requirements in paragraph (II...
40 CFR Appendix A to Subpart S of... - Calibrations, Adjustments and Quality Control
Code of Federal Regulations, 2011 CFR
2011-07-01
... average of the pre-test and post-test ambient background levels shall be compared to the permissible...—Calibrations, Adjustments and Quality Control (I) Steady-State Test Equipment States may opt to use transient emission test equipment for steady-state tests and follow the quality control requirements in paragraph (II...
40 CFR Appendix A to Subpart S of... - Calibrations, Adjustments and Quality Control
Code of Federal Regulations, 2013 CFR
2013-07-01
... average of the pre-test and post-test ambient background levels shall be compared to the permissible...—Calibrations, Adjustments and Quality Control (I) Steady-State Test Equipment States may opt to use transient emission test equipment for steady-state tests and follow the quality control requirements in paragraph (II...
40 CFR Appendix A to Subpart S of... - Calibrations, Adjustments and Quality Control
Code of Federal Regulations, 2014 CFR
2014-07-01
... average of the pre-test and post-test ambient background levels shall be compared to the permissible...—Calibrations, Adjustments and Quality Control (I) Steady-State Test Equipment States may opt to use transient emission test equipment for steady-state tests and follow the quality control requirements in paragraph (II...
Code of Federal Regulations, 2011 CFR
2011-07-01
... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false Fire test. 183.590 Section 183... SAFETY BOATS AND ASSOCIATED EQUIPMENT Fuel Systems Tests § 183.590 Fire test. (a) A piece of equipment is... hull section. (b) Each fire test is conducted with free burning heptane and the component must be...
46 CFR 162.050-9 - Test report.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 6 2014-10-01 2014-10-01 false Test report. 162.050-9 Section 162.050-9 Shipping COAST...: SPECIFICATIONS AND APPROVAL ENGINEERING EQUIPMENT Pollution Prevention Equipment § 162.050-9 Test report. (a) A... applicant. (3) Date of receiving the item for testing and the dates of the tests conducted. (4) Trade name...
Post test review of a single car test of multi-level passenger equipment
DOT National Transportation Integrated Search
2008-04-22
The single car test of multi-level equipment described in : this paper was designed to help evaluate the crashworthiness of : a multi-level car in a controlled collision. The data collected : from this test will be used to refine engineering models. ...
Rail passenger equipment crashworthiness testing requirements and implementation
DOT National Transportation Integrated Search
2000-11-01
This paper describes the requirements and the implementation of a series of impact tests of rail passenger equipment. The test : requirements the desired measurements are dictated by the : characteristics of the vehicle, as well as uncertainties in t...
13. INTERIOR VIEW TO THE WEST OF EQUIPMENT IN ROOM ...
13. INTERIOR VIEW TO THE WEST OF EQUIPMENT IN ROOM 2, RADIATION EFFECTS ROOM. - Nevada Test Site, Test Cell A Facility, Test Cell A Building & Addition, Area 25, Jackass Flats, Road F, Mercury, Nye County, NV
Bidirectional power converter control electronics
NASA Technical Reports Server (NTRS)
Mildice, J. W.
1987-01-01
The object of this program was to design, build, test, and deliver a set of control electronics suitable for control of bidirectional resonant power processing equipment of the direct output type. The program is described, including the technical background, and results discussed. Even though the initial program tested only the logic outputs, the hardware was subsequently tested with high-power breadboard equipment, and in the testbed of NASA contract NAS3-24399. The completed equipment is now operating as part of the Space Station Power System Test Facility at NASA Lewis Research Center.
Malfunction of medical equipment as a result of mains borne interference.
Railton, R; Currie, G D; Corner, G A; Evans, A L
1993-08-01
Medical equipment has become more intelligent as the manufacturers have incorporated the latest microprocessor based technology. Equipment malfunction can be caused at any time by inherent errors in the control program but it is particularly important that this is designed to cope with the effects of electrical interference which, in addition, may cause corruption of the software. We have considered interference found in the mains supply in the hospital environment. Using a test protocol with appropriate interference simulators, a wide range of medical equipment was removed temporarily from use and its immunity to electrical mains borne interference tested. Battery operated mains rechargeable devices were unaffected by mains voltage variations including drop-outs and sags whereas mains powered devices were affected to varying degrees of severity. In particular, repetitive drop-outs caused loss of power due to fuse blowing in some life support equipment. Impulses affected 25% and pulse bursts 50% of the equipment tested with some evidence that the more recent designs coped better. The EEC Directive on electro-medical compatibility compliance may cause the design of equipment to be improved but hospitals will have to cope with the above problems in their existing equipment for many years to come.
30 CFR 18.91 - Electric equipment for which field approvals will be issued.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Electric equipment for which field approvals... OF LABOR TESTING, EVALUATION, AND APPROVAL OF MINING PRODUCTS ELECTRIC MOTOR-DRIVEN MINE EQUIPMENT AND ACCESSORIES Field Approval of Electrically Operated Mining Equipment § 18.91 Electric equipment...
30 CFR 18.91 - Electric equipment for which field approvals will be issued.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Electric equipment for which field approvals... OF LABOR TESTING, EVALUATION, AND APPROVAL OF MINING PRODUCTS ELECTRIC MOTOR-DRIVEN MINE EQUIPMENT AND ACCESSORIES Field Approval of Electrically Operated Mining Equipment § 18.91 Electric equipment...
Design and implementation of a general and automatic test platform base on NI PXI system
NASA Astrophysics Data System (ADS)
Shi, Long
2018-05-01
Aiming at some difficulties of test equipment such as the short product life, poor generality and high development cost, a general and automatic test platform base on NI PXI system is designed in this paper, which is able to meet most test requirements of circuit boards. The test platform is devided into 5 layers, every layer is introduced in detail except for the "Equipment Under Test" layer. An output board of a track-side equipment, which is an important part of high speed train control system, is taken as an example to make the functional circuit test by the test platform. The results show that the test platform is easy to realize add-on functions development, automatic test, wide compatibility and strong generality.
40 CFR 86.1406 - Equipment required and specifications; overview.
Code of Federal Regulations, 2011 CFR
2011-07-01
... minimize condensation. (b) Fuel and analytical tests. Fuel requirements for the CST are specified in §§ 86...-Cycle Light-Duty Trucks; Certification Short Test Procedures § 86.1406 Equipment required and specifications; overview. (a) Exhaust emission tests. All vehicles subject to this subpart are tested for exhaust...
40 CFR 86.1406 - Equipment required and specifications; overview.
Code of Federal Regulations, 2013 CFR
2013-07-01
... minimize condensation. (b) Fuel and analytical tests. Fuel requirements for the CST are specified in §§ 86...-Cycle Light-Duty Trucks; Certification Short Test Procedures § 86.1406 Equipment required and specifications; overview. (a) Exhaust emission tests. All vehicles subject to this subpart are tested for exhaust...
40 CFR 86.1406 - Equipment required and specifications; overview.
Code of Federal Regulations, 2010 CFR
2010-07-01
... minimize condensation. (b) Fuel and analytical tests. Fuel requirements for the CST are specified in §§ 86...-Cycle Light-Duty Trucks; Certification Short Test Procedures § 86.1406 Equipment required and specifications; overview. (a) Exhaust emission tests. All vehicles subject to this subpart are tested for exhaust...
40 CFR 86.1406 - Equipment required and specifications; overview.
Code of Federal Regulations, 2012 CFR
2012-07-01
... minimize condensation. (b) Fuel and analytical tests. Fuel requirements for the CST are specified in §§ 86...-Cycle Light-Duty Trucks; Certification Short Test Procedures § 86.1406 Equipment required and specifications; overview. (a) Exhaust emission tests. All vehicles subject to this subpart are tested for exhaust...
Study on the shipboard radar reconnaissance equipment azimuth benchmark method
NASA Astrophysics Data System (ADS)
Liu, Zhenxing; Jiang, Ning; Ma, Qian; Liu, Songtao; Wang, Longtao
2015-10-01
The future naval battle will take place in a complex electromagnetic environment. Therefore, seizing the electromagnetic superiority has become the major actions of the navy. Radar reconnaissance equipment is an important part of the system to obtain and master battlefield electromagnetic radiation source information. Azimuth measurement function is one of the main function radar reconnaissance equipments. Whether the accuracy of direction finding meets the requirements, determines the vessels successful or not active jamming, passive jamming, guided missile attack and other combat missions, having a direct bearing on the vessels combat capabilities . How to test the performance of radar reconnaissance equipment, while affecting the task as little as possible is a problem. This paper, based on radar signal simulator and GPS positioning equipment, researches and experiments on one new method, which povides the azimuth benchmark required by the direction-finding precision test anytime anywhere, for the ships at jetty to test radar reconnaissance equipment performance in direction-finding. It provides a powerful means for the naval radar reconnaissance equipments daily maintenance and repair work[1].
An overview of passenger equipment full-scale impact tests
DOT National Transportation Integrated Search
2003-10-07
As part of the Federal Railroad Administrations Equipment Safety Research Program, a series of full-scale impact tests are being conducted on rail passenger vehicles. Four types of tests are intended to define the performance of current-design equ...
Code of Federal Regulations, 2014 CFR
2014-07-01
... PROCEDURES Equipment, Measurement Instruments, Fuel, and Analytical Gas Specifications § 1066.101 Overview. (a) This subpart addresses equipment related to emission testing, as well as test fuels and... specifications for fuels, engine fluids, and analytical gases; these specifications apply for testing under this...
Functional Testing Communication Equipment (Avionics).
1980-07-31
Yes No . Comment : 2. Were the facilities, test equipment, instrumentation, and support accommodations adequate to accomplish the test objectives...Yes No . Comment : 3. Have all data collected been reviewed for correctness and completeness? Yes No . Comment : 4. Were the test results compromised in...any way due to insufficient test planning? Yes No . Comment : 5. Were the test results compromised in any way due to test performance procedures? Yes No
High Vacuum Creep Facility in the Materials Processing Laboratory
1973-01-21
Technicians at work in the Materials Processing Laboratory’s Creep Facility at the National Aeronautics and Space Administration (NASA) Lewis Research Center. The technicians supported the engineers’ studies of refractory materials, metals, and advanced superalloys. The Materials Processing Laboratory contained laboratories and test areas equipped to prepare and develop these metals and materials. The ultra-high vacuum lab, seen in this photograph, contained creep and tensile test equipment. Creep testing is used to study a material’s ability to withstand long durations under constant pressure and temperatures. The equipment measured the strain over a long period of time. Tensile test equipment subjects the test material to strain until the material fails. The two tests were used to determine the strength and durability of different materials. The Materials Processing Laboratory also housed arc and electron beam melting furnaces, a hydraulic vertical extrusion press, compaction and forging equipment, and rolling mills and swagers. There were cryogenic and gas storage facilities and mechanical and oil diffusion vacuum pumps. The facility contained both instrumental and analytical chemistry laboratories for work on radioactive or toxic materials and the only shop to machine toxic materials in the Midwest.
Code of Federal Regulations, 2014 CFR
2014-07-01
... SAFETY BOATS AND ASSOCIATED EQUIPMENT Fuel Systems Tests § 183.590 Fire test. (a) A piece of equipment is tested under the following conditions and procedures: (1) Fuel stop valves, “USCG Type A1” or USCG Type... 33 Navigation and Navigable Waters 2 2014-07-01 2014-07-01 false Fire test. 183.590 Section 183...
Code of Federal Regulations, 2010 CFR
2010-07-01
... SAFETY BOATS AND ASSOCIATED EQUIPMENT Fuel Systems Tests § 183.590 Fire test. (a) A piece of equipment is tested under the following conditions and procedures: (1) Fuel stop valves, “USCG Type A1” or USCG Type... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Fire test. 183.590 Section 183...
Code of Federal Regulations, 2012 CFR
2012-07-01
... SAFETY BOATS AND ASSOCIATED EQUIPMENT Fuel Systems Tests § 183.590 Fire test. (a) A piece of equipment is tested under the following conditions and procedures: (1) Fuel stop valves, “USCG Type A1” or USCG Type... 33 Navigation and Navigable Waters 2 2012-07-01 2012-07-01 false Fire test. 183.590 Section 183...
Code of Federal Regulations, 2013 CFR
2013-07-01
... SAFETY BOATS AND ASSOCIATED EQUIPMENT Fuel Systems Tests § 183.590 Fire test. (a) A piece of equipment is tested under the following conditions and procedures: (1) Fuel stop valves, “USCG Type A1” or USCG Type... 33 Navigation and Navigable Waters 2 2013-07-01 2013-07-01 false Fire test. 183.590 Section 183...
49 CFR 232.309 - Equipment and devices used to perform single car air brake tests.
Code of Federal Regulations, 2010 CFR
2010-10-01
... least once each calendar day of use. (b) Except for single car test devices, mechanical test devices such as pressure gauges, flow meters, orifices, etc. shall be calibrated once every 92 days. (c) Electronic test devices shall be calibrated at least once every 365 days. (d) Test equipment and single car...
47 CFR 24.243 - The cost-sharing formula.
Code of Federal Regulations, 2010 CFR
2010-10-01
...; monitoring or control equipment; engineering costs (design/path survey); installation; systems testing; FCC filing costs; site acquisition and civil works; zoning costs; training; disposal of old equipment; test...
Design of efficient and simple interface testing equipment for opto-electric tracking system
NASA Astrophysics Data System (ADS)
Liu, Qiong; Deng, Chao; Tian, Jing; Mao, Yao
2016-10-01
Interface testing for opto-electric tracking system is one important work to assure system running performance, aiming to verify the design result of every electronic interface matching the communication protocols or not, by different levels. Opto-electric tracking system nowadays is more complicated, composed of many functional units. Usually, interface testing is executed between units manufactured completely, highly depending on unit design and manufacture progress as well as relative people. As a result, it always takes days or weeks, inefficiently. To solve the problem, this paper promotes an efficient and simple interface testing equipment for opto-electric tracking system, consisting of optional interface circuit card, processor and test program. The hardware cards provide matched hardware interface(s), easily offered from hardware engineer. Automatic code generation technique is imported, providing adaption to new communication protocols. Automatic acquiring items, automatic constructing code architecture and automatic encoding are used to form a new program quickly with adaption. After simple steps, a standard customized new interface testing equipment with matching test program and interface(s) is ready for a waiting-test system in minutes. The efficient and simple interface testing equipment for opto-electric tracking system has worked for many opto-electric tracking system to test entire or part interfaces, reducing test time from days to hours, greatly improving test efficiency, with high software quality and stability, without manual coding. Used as a common tool, the efficient and simple interface testing equipment for opto-electric tracking system promoted by this paper has changed traditional interface testing method and created much higher efficiency.
NASA Technical Reports Server (NTRS)
1974-01-01
The proposed spacecraft consists of a bus module, containing all subsystems required for support of the sensors, and a payload module containing all of the sensor equipment. The two modules are bolted together to form the spacecraft, and electrical interfaces are accomplished via mated connectors at the interface plane. This approach permits independent parallel assembly and test operations on each module up until mating for final spacecraft integration and test operations. Proposed program schedules recognize the need to refine sensor/spacecraft interfaces prior to proceeding with procurement, reflect the lead times estimated by suppliers for delivery of equipment, reflect a comprehensive test program, and provide flexibility for unanticipated problems. The spacecraft systems are described in detail along with aerospace ground equipment, ground handling equipment, the launch vehicle, imaging radar incorporation, and systems tests.
High level radioactive waste vitrification process equipment component testing
NASA Astrophysics Data System (ADS)
Siemens, D. H.; Health, W. C.; Larson, D. E.; Craig, S. N.; Berger, D. N.; Goles, R. W.
1985-04-01
Remote operability and maintainability of vitrification equipment were assessment under shielded cell conditions. The equipment tested will be applied to immobilize high level and transuranic liquid waste slurries that resulted from plutonium production for defense weapons. Equipment tested included: a turntable for handling waste canisters under the melter; a removable discharge cone in the melter overflow section; a thermocouple jumper that extends into a shielded cell; remote instrument and electrical connectors; remote, mechanical, and heat transfer aspects of the melter glass overflow section; a reamer to clean out plugged nozzles in the melter top; a closed circuit camera to view the melter interior; and a device to retrieve samples of the glass product. A test was also conduucted to evaluate liquid metals for use in a liquid metal sealing system.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-11
... apply to: prototypes (new designs) submitted after January 1, 2012; production testing of designs... Lifesaving Equipment: Production Testing and Harmonization With International Standards AGENCY: Coast Guard... and Standards Directorate, Office of Design and Engineering Standards, Lifesaving and Fire Safety...
LPT. Shield test facility (TAN645) interior. Mechanical equipment room with ...
LPT. Shield test facility (TAN-645) interior. Mechanical equipment room with switchgear and control boards. Photographer: Jack L. Anderson. Date: February 20, 1959. INEEL negative no. 59-858 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID
LPT. Shield test facility (TAN645) interior. Mechanical equipment room with ...
LPT. Shield test facility (TAN-645) interior. Mechanical equipment room with airwasher and refrigeration compressor. Photographer: Jack L. Anderson. Date: February 20, 1959. INEEL negative no. 59-855 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID
14. INTERIOR VIEW TO THE EAST OF EQUIPMENT IN ROOM ...
14. INTERIOR VIEW TO THE EAST OF EQUIPMENT IN ROOM 3, FLOW CONTROL ROOM, BUILDING 3113/3113A. - Nevada Test Site, Test Cell A Facility, Test Cell A Building & Addition, Area 25, Jackass Flats, Road F, Mercury, Nye County, NV
NASA Shuttle Logistics Depot (NSLD) - The application of ATE
NASA Technical Reports Server (NTRS)
Simpkins, Lorenz G.; Jenkins, Henry C.; Mauceri, A. Jack
1990-01-01
The concept of the NASA Shuttle Logistics Depot (NSLD) developed for the Space Shuttle Orbiter Program is described. The function of the NSLD at Cape Canaveral is to perform the acceptance and diagnostic testing of the Shuttle's space-rated line-replaceable units and shop-replaceable units (SRUs). The NSLD includes a comprehensive electronic automatic test station, program development stations, and assorted manufacturing support equipment (including thermal and vibration test equipment, special test equipment, and a card SRU test system). The depot activities also include the establishment of the functions for manufacturing of mechanical parts, soldering, welding, painting, clean room operation, procurement, and subcontract management.
Fuel Cell Stations Automate Processes, Catalyst Testing
NASA Technical Reports Server (NTRS)
2010-01-01
Glenn Research Center looks for ways to improve fuel cells, which are an important source of power for space missions, as well as the equipment used to test fuel cells. With Small Business Innovation Research (SBIR) awards from Glenn, Lynntech Inc., of College Station, Texas, addressed a major limitation of fuel cell testing equipment. Five years later, the company obtained a patent and provided the equipment to the commercial world. Now offered through TesSol Inc., of Battle Ground, Washington, the technology is used for fuel cell work, catalyst testing, sensor testing, gas blending, and other applications. It can be found at universities, national laboratories, and businesses around the world.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-02
... procedure for commercial refrigeration equipment because the equipment cannot operate at the specified... Program for certain industrial equipment, which includes commercial refrigeration equipment, the focus of... establish and amend test procedures for commercial refrigeration equipment. (42 U.S.C. 6314(a)(6)(C)) On...
2016-03-16
PIs at Boise State University. . . . 39 3.16 Phase noise measurement results via mm-wave test bed. . . . . . . . 40 iv Chapter 1 Foreword WIRELESS...enabling the PI to acquire various testing 1 and measurement equipment that can be used to enhance instructional, research, and outreach activities at...etc. Although the Digital Signal Processing and Communication Laboratory (DSPCL) at CSUB was equipped with basic testing and measurement equipment and
Code of Federal Regulations, 2011 CFR
2011-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL ENGINEERING EQUIPMENT Pollution Prevention Equipment § 162.050-1 Scope. (a) This subpart contains... specifications for this equipment; (3) Tests required for approval; (4) Procedures for obtaining designation as a...
Eddy Current, Magnetic Particle and Hardness Testing, Aviation Quality Control (Advanced): 9227.04.
ERIC Educational Resources Information Center
Dade County Public Schools, Miami, FL.
This unit of instruction includes the principles of eddy current, magnetic particle and hardness testing; standards used for analyzing test results; techniques of operating equipment; interpretation of indications; advantages and limitations of these methods of testing; care and calibration of equipment; and safety and work precautions. Motion…
14 CFR 91.411 - Altimeter system and altitude reporting equipment tests and inspections.
Code of Federal Regulations, 2012 CFR
2012-01-01
... reporting equipment tests and inspections. (a) No person may operate an airplane, or helicopter, in... conducted by— (1) The manufacturer of the airplane, or helicopter, on which the tests and inspections are to... airframe rating appropriate to the airplane, or helicopter, to be tested; or (3) A certificated mechanic...
14 CFR 91.411 - Altimeter system and altitude reporting equipment tests and inspections.
Code of Federal Regulations, 2013 CFR
2013-01-01
... reporting equipment tests and inspections. (a) No person may operate an airplane, or helicopter, in... conducted by— (1) The manufacturer of the airplane, or helicopter, on which the tests and inspections are to... airframe rating appropriate to the airplane, or helicopter, to be tested; or (3) A certificated mechanic...
14 CFR 91.411 - Altimeter system and altitude reporting equipment tests and inspections.
Code of Federal Regulations, 2014 CFR
2014-01-01
... reporting equipment tests and inspections. (a) No person may operate an airplane, or helicopter, in... conducted by— (1) The manufacturer of the airplane, or helicopter, on which the tests and inspections are to... airframe rating appropriate to the airplane, or helicopter, to be tested; or (3) A certificated mechanic...
14 CFR 91.411 - Altimeter system and altitude reporting equipment tests and inspections.
Code of Federal Regulations, 2011 CFR
2011-01-01
... reporting equipment tests and inspections. (a) No person may operate an airplane, or helicopter, in... conducted by— (1) The manufacturer of the airplane, or helicopter, on which the tests and inspections are to... airframe rating appropriate to the airplane, or helicopter, to be tested; or (3) A certificated mechanic...
14 CFR 91.411 - Altimeter system and altitude reporting equipment tests and inspections.
Code of Federal Regulations, 2010 CFR
2010-01-01
... reporting equipment tests and inspections. (a) No person may operate an airplane, or helicopter, in... conducted by— (1) The manufacturer of the airplane, or helicopter, on which the tests and inspections are to... airframe rating appropriate to the airplane, or helicopter, to be tested; or (3) A certificated mechanic...
46 CFR 160.017-21 - Approval tests.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 6 2011-10-01 2011-10-01 false Approval tests. 160.017-21 Section 160.017-21 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Chain Ladder § 160.017-21 Approval tests. (a) General. Each approval test must be conducted on a ladder...
46 CFR 113.05-7 - Environmental tests.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Environmental tests. 113.05-7 Section 113.05-7 Shipping... SYSTEMS AND EQUIPMENT General Provisions § 113.05-7 Environmental tests. Communication, alarm system, control, and monitoring equipment must meet the environmental tests of— (a) Section 4-9-7, Table 9, of ABS...
46 CFR 113.05-7 - Environmental tests.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Environmental tests. 113.05-7 Section 113.05-7 Shipping... SYSTEMS AND EQUIPMENT General Provisions § 113.05-7 Environmental tests. Communication, alarm system, control, and monitoring equipment must meet the environmental tests of— (a) Section 4-9-7, Table 9, of ABS...
49 CFR 232.505 - Pre-revenue service acceptance testing plan.
Code of Federal Regulations, 2013 CFR
2013-10-01
... acceptance tests; (3) Correct any safety deficiencies identified by FRA in the design of the equipment or in... principal test objectives shall be to demonstrate that the equipment meets the safety design and performance... 49 Transportation 4 2013-10-01 2013-10-01 false Pre-revenue service acceptance testing plan. 232...
49 CFR 232.505 - Pre-revenue service acceptance testing plan.
Code of Federal Regulations, 2012 CFR
2012-10-01
... acceptance tests; (3) Correct any safety deficiencies identified by FRA in the design of the equipment or in... principal test objectives shall be to demonstrate that the equipment meets the safety design and performance... 49 Transportation 4 2012-10-01 2012-10-01 false Pre-revenue service acceptance testing plan. 232...
49 CFR 232.505 - Pre-revenue service acceptance testing plan.
Code of Federal Regulations, 2014 CFR
2014-10-01
... acceptance tests; (3) Correct any safety deficiencies identified by FRA in the design of the equipment or in... principal test objectives shall be to demonstrate that the equipment meets the safety design and performance... 49 Transportation 4 2014-10-01 2014-10-01 false Pre-revenue service acceptance testing plan. 232...
49 CFR 232.505 - Pre-revenue service acceptance testing plan.
Code of Federal Regulations, 2011 CFR
2011-10-01
... acceptance tests; (3) Correct any safety deficiencies identified by FRA in the design of the equipment or in... principal test objectives shall be to demonstrate that the equipment meets the safety design and performance... 49 Transportation 4 2011-10-01 2011-10-01 false Pre-revenue service acceptance testing plan. 232...
46 CFR 160.056-4 - Approval tests of prototype rescue boat.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 6 2011-10-01 2011-10-01 false Approval tests of prototype rescue boat. 160.056-4..., CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Rescue Boat § 160.056-4 Approval tests of prototype rescue boat. (a) Drop test. The rescue boat, fully equipped, shall be dropped, in a...
46 CFR 160.056-4 - Approval tests of prototype rescue boat.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 6 2012-10-01 2012-10-01 false Approval tests of prototype rescue boat. 160.056-4..., CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Rescue Boat § 160.056-4 Approval tests of prototype rescue boat. (a) Drop test. The rescue boat, fully equipped, shall be dropped, in a...
46 CFR 160.056-4 - Approval tests of prototype rescue boat.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 6 2014-10-01 2014-10-01 false Approval tests of prototype rescue boat. 160.056-4..., CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Rescue Boat § 160.056-4 Approval tests of prototype rescue boat. (a) Drop test. The rescue boat, fully equipped, shall be dropped, in a...
46 CFR 160.056-4 - Approval tests of prototype rescue boat.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 6 2013-10-01 2013-10-01 false Approval tests of prototype rescue boat. 160.056-4..., CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Rescue Boat § 160.056-4 Approval tests of prototype rescue boat. (a) Drop test. The rescue boat, fully equipped, shall be dropped, in a...
46 CFR 113.05-7 - Environmental tests.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Environmental tests. 113.05-7 Section 113.05-7 Shipping... SYSTEMS AND EQUIPMENT General Provisions § 113.05-7 Environmental tests. Communication, alarm system, control, and monitoring equipment must meet the environmental tests of— (a) Section 4-9-7, Table 9, of ABS...
46 CFR 160.056-4 - Approval tests of prototype rescue boat.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 6 2010-10-01 2010-10-01 false Approval tests of prototype rescue boat. 160.056-4 Section 160.056-4 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT... tests of prototype rescue boat. (a) Drop test. The rescue boat, fully equipped, shall be dropped, in a...
20. VIEW OF TEST FACILITY IN 1967 WHEN EQUIPPED FOR ...
20. VIEW OF TEST FACILITY IN 1967 WHEN EQUIPPED FOR DOSIMETER TEST BY HEALTH PHYSICISTS. CAMERA FACING EAST. INEL PHOTO NUMBER 76-2853, TAKEN MAY 16, 1967. PHOTOGRAPHER: CAPEK. - Idaho National Engineering Laboratory, Advanced Reentry Vehicle Fusing System, Scoville, Butte County, ID
Definition study for an extended manned test of a regenerative life support system
NASA Technical Reports Server (NTRS)
1971-01-01
A program was defined which consists of extended ground-based manned tests of regenerative life support systems. The tests are to evaluate prototypes of advanced life support systems under operational, integrated conditions, thus providing data for the design of efficient environmental control and life support systems for use in long-duration space missions. The requirements are defined for test operations to provide a simulation of an orbiting space laboratory. The features of Phase A and B programs are described. These tests use proven backup equipment to ensure successful evaluation of the advanced subsystems. A pre-tests all-systems checkout period is provided to minimize equipment problems during extended testing and to familiarize all crew and operating staff members with test equipment and procedures.
Effect of basic laparoscopic skills courses on essential knowledge of equipment.
van Hove, P Diederick; Verdaasdonk, Emiel G G; van der Harst, Erwin; Jansen, Frank Willem; Dankelman, Jenny; Stassen, Laurents P S
2012-12-01
This study aims to evaluate the effect of laparoscopic skills courses on the knowledge of laparoscopic equipment. A knowledge test on laparoscopic equipment was developed, and participants of 3 separate basic laparoscopic skills courses in the Netherlands completed the test at the beginning and end of these courses. All lectures and demonstrations during the courses were recorded on video to assess the matching of its contents with the items in the test. As a reference, the test was also completed by a group of laparoscopic experts by e-mail. In total, 36 participants (64.3%) completed both the pretest and posttest. Overall, the mean test score improved from 60.4% of the maximum possible score for the pretest to 68.4% for the posttest. There were no significant differences in test scores between the 3 separate courses. However, the actual content varied among the courses. The correspondence of the test items with the course content varied from 47% to 69%. Although 30% of the participants had already received training for laparoscopic equipment in their own hospital, 92.5% wanted to receive more training. 28 experts completed the test with a mean score of 75.7%, which was significantly better than the posttest score of the course participants. The laparoscopic skills courses evaluated in this study had a modest positive effect on the acquisition of knowledge about laparoscopic equipment. Variance exists among their contents.
18 CFR 367.3950 - Account 395, Laboratory equipment.
Code of Federal Regulations, 2011 CFR
2011-04-01
... bottles for meter prover testing. (33) Standard cell, reactance, resistor, and shunt. (34) Stills. (35.... (45) Other items of equipment for testing gas, fuel, flue gas, water, residuals, and other similar...
40 CFR 86.206-94 - Equipment required; overview.
Code of Federal Regulations, 2010 CFR
2010-07-01
... tests. Exhaust from gasoline-fueled vehicles is tested for gaseous emissions using the Constant Volume Sampler (CVS) concept (§ 86.209). Equipment necessary and specifications appear in §§ 86.208 through 86...
Electronic equipment vulnerability to fire released carbon fibers
NASA Technical Reports Server (NTRS)
Pride, R. A.; Mchatton, A. D.; Musselman, K. A.
1980-01-01
The vulnerability of electronic equipment to damage by carbon fibers released from burning aircraft type structural composite materials was investigated. Tests were conducted on commercially available stereo power amplifiers which showed that the equipment was damaged by fire released carbon fibers but not by the composite resin residue, soot and products of combustion of the fuel associated with burning the carbon fiber composites. Results indicate that the failure rates of the equipment exposed to the fire released fiber were consistent with predictions based on tests using virgin fibers.
Hubbell, Joel M.; Sisson, James B.
2005-07-26
A method of inserting a tensiometer into a sample, comprises providing a drive probe configured to be engaged by direct push equipment; supporting a porous member from the drive probe; and driving the drive probe into the sample using a cone penetrometer. A tensiometer comprises a drive probe configured to be engaged by direct push equipment or a cone penetrometer; a porous member supported by the drive probe; and a pressure sensor in pressure sensing relation to the porous member.
33 CFR 157.12f - Workshop functional test requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... CARRYING OIL IN BULK Design, Equipment, and Installation § 157.12f Workshop functional test requirements... the specific design of equipment. A completed workshop certificate including the delivery test... several ppm values on all measurement scales when operated on an oil appropriate for the application of...
33 CFR 157.12f - Workshop functional test requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
... CARRYING OIL IN BULK Design, Equipment, and Installation § 157.12f Workshop functional test requirements... the specific design of equipment. A completed workshop certificate including the delivery test... several ppm values on all measurement scales when operated on an oil appropriate for the application of...
10 CFR 71.125 - Control of measuring and test equipment.
Code of Federal Regulations, 2010 CFR
2010-01-01
... MATERIAL Quality Assurance § 71.125 Control of measuring and test equipment. The licensee, certificate holder, and applicant for a CoC shall establish measures to assure that tools, gauges, instruments, and other measuring and testing devices used in activities affecting quality are properly controlled...
40 CFR 89.305 - Equipment measurement accuracy/calibration frequency.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 20 2010-07-01 2010-07-01 false Equipment measurement accuracy... (CONTINUED) AIR PROGRAMS (CONTINUED) CONTROL OF EMISSIONS FROM NEW AND IN-USE NONROAD COMPRESSION-IGNITION ENGINES Emission Test Equipment Provisions § 89.305 Equipment measurement accuracy/calibration frequency...
Development of Partial Discharging Simulation Test Equipment
NASA Astrophysics Data System (ADS)
Kai, Xue; Genghua, Liu; Yan, Jia; Ziqi, Chai; Jian, Lu
2017-12-01
In the case of partial discharge training for recruits who lack of on-site work experience, the risk of physical shock and damage of the test equipment may be due to the limited skill level and improper operation by new recruits. Partial discharge simulation tester is the use of simulation technology to achieve partial discharge test process simulation, relatively true reproduction of the local discharge process and results, so that the operator in the classroom will be able to get familiar with and understand the use of the test process and equipment.The teacher sets up the instrument to display different partial discharge waveforms so that the trainees can analyze the test results of different partial discharge types.
Cold Regions Logistic Supportability Testing of Electronic, Avionic and Communications Equipment.
1985-06-20
Comment : 2. Have all data collected been reviewed for correctness and completeness? YES NO . Comment : 3. Were the facilities, test equipment...insufficient test planning? YES NO . Comment : 5. Were the test results compromised in any way due to test performance procedures? YES NO . Comment : 6. Were the...test results compromised in any way due to test control pro- cedures? YES NO Comment : 7. Were the test results compromised in any way due to data
Tracking reliability for space cabin-borne equipment in development by Crow model.
Chen, J D; Jiao, S J; Sun, H L
2001-12-01
Objective. To study and track the reliability growth of manned spaceflight cabin-borne equipment in the course of its development. Method. A new technique of reliability growth estimation and prediction, which is composed of the Crow model and test data conversion (TDC) method was used. Result. The estimation and prediction value of the reliability growth conformed to its expectations. Conclusion. The method could dynamically estimate and predict the reliability of the equipment by making full use of various test information in the course of its development. It offered not only a possibility of tracking the equipment reliability growth, but also the reference for quality control in manned spaceflight cabin-borne equipment design and development process.
Vanguard/PLACE experiment system design and test plan
NASA Technical Reports Server (NTRS)
Taylor, R. E.
1973-01-01
The design, development, and testing of the NASA-GFSC Position Location and Aircraft Communications Equipment (PLACE) at C band frequency are discussed. The equipment was installed on the USNS Vanguard. The tests involved a sea test to evalute the position-location, 2-way voice, and 2-way data communications capability of PLACE and a trilateration test to position-fix the ATS-5 satellite using the PLACE system.
MICHELLE TILLOTSON WITH TEST EQUIPMENT
2016-01-20
MICHELLE TILLOTSON, AN ENGINEER AT NASA’S MARSHALL SPACE FLIGHT CENTER, SHOWS KALYN HOPKINS A STUDENT AT THE MIAMI VALLEY SCHOOL, DAYTON OHIO, NEW EQUIPMENT THAT WILL BE USED TO TEST THE PROPELLANT TANKS FOR THE SLS
Flow equation for porous plug and capillary tube flow restrictors
NASA Technical Reports Server (NTRS)
Davis, W. S.
1972-01-01
Development of flow measuring apparatus for determining low flow performance of resistojet thruster is discussed. Diagram of test equipment is presented. Operation of test equipment is described and numerical relationships are explained.
2018-02-01
29 during Soldier Equipment Configuration Impact on Performance: Establishing a Test Methodology for the...Performance of Medium Rucksack Prototypes An investigation: Comparison of live-fire and weapon simulator test methodologies and the of three extremity armor
30 CFR 33.21 - Modification of test equipment.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Modification of test equipment. 33.21 Section 33.21 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR TESTING, EVALUATION, AND APPROVAL OF MINING PRODUCTS DUST COLLECTORS FOR USE IN CONNECTION WITH ROCK DRILLING IN COAL...
30 CFR 33.21 - Modification of test equipment.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Modification of test equipment. 33.21 Section 33.21 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR TESTING, EVALUATION, AND APPROVAL OF MINING PRODUCTS DUST COLLECTORS FOR USE IN CONNECTION WITH ROCK DRILLING IN COAL...
30 CFR 33.21 - Modification of test equipment.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Modification of test equipment. 33.21 Section 33.21 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR TESTING, EVALUATION, AND APPROVAL OF MINING PRODUCTS DUST COLLECTORS FOR USE IN CONNECTION WITH ROCK DRILLING IN COAL...
30 CFR 33.21 - Modification of test equipment.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Modification of test equipment. 33.21 Section 33.21 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR TESTING, EVALUATION, AND APPROVAL OF MINING PRODUCTS DUST COLLECTORS FOR USE IN CONNECTION WITH ROCK DRILLING IN COAL...
30 CFR 33.21 - Modification of test equipment.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Modification of test equipment. 33.21 Section 33.21 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR TESTING, EVALUATION, AND APPROVAL OF MINING PRODUCTS DUST COLLECTORS FOR USE IN CONNECTION WITH ROCK DRILLING IN COAL...
40 CFR 86.1506 - Equipment required and specifications; overview.
Code of Federal Regulations, 2012 CFR
2012-07-01
... specifications appear in §§ 86.1509 through 86.1511. (2) Fuel and analytical tests. Fuel requirements for idle... Test Procedures § 86.1506 Equipment required and specifications; overview. (a) This subpart contains procedures for performing idle exhaust emission tests on Otto-cycle heavy-duty engines and Otto-cycle light...
40 CFR 1060.505 - Other procedures.
Code of Federal Regulations, 2011 CFR
2011-07-01
... equipment will use another volatile liquid fuel instead of gasoline, use a test fuel that is representative... the test procedures to reflect the effects of using a fuel other than gasoline. (d) Approval. If we... CONTROL OF EVAPORATIVE EMISSIONS FROM NEW AND IN-USE NONROAD AND STATIONARY EQUIPMENT Test Procedures...
40 CFR 86.1506 - Equipment required and specifications; overview.
Code of Federal Regulations, 2011 CFR
2011-07-01
... specifications appear in §§ 86.1509 through 86.1511. (2) Fuel and analytical tests. Fuel requirements for idle... Test Procedures § 86.1506 Equipment required and specifications; overview. (a) This subpart contains procedures for performing idle exhaust emission tests on Otto-cycle heavy-duty engines and Otto-cycle light...
40 CFR 86.1506 - Equipment required and specifications; overview.
Code of Federal Regulations, 2013 CFR
2013-07-01
... specifications appear in §§ 86.1509 through 86.1511. (2) Fuel and analytical tests. Fuel requirements for idle... Test Procedures § 86.1506 Equipment required and specifications; overview. (a) This subpart contains procedures for performing idle exhaust emission tests on Otto-cycle heavy-duty engines and Otto-cycle light...
40 CFR 1060.505 - Other procedures.
Code of Federal Regulations, 2012 CFR
2012-07-01
... equipment will use another volatile liquid fuel instead of gasoline, use a test fuel that is representative... the test procedures to reflect the effects of using a fuel other than gasoline. (d) Approval. If we... CONTROL OF EVAPORATIVE EMISSIONS FROM NEW AND IN-USE NONROAD AND STATIONARY EQUIPMENT Test Procedures...
40 CFR 1060.505 - Other procedures.
Code of Federal Regulations, 2010 CFR
2010-07-01
... equipment will use another volatile liquid fuel instead of gasoline, use a test fuel that is representative... the test procedures to reflect the effects of using a fuel other than gasoline. (d) Approval. If we... CONTROL OF EVAPORATIVE EMISSIONS FROM NEW AND IN-USE NONROAD AND STATIONARY EQUIPMENT Test Procedures...
40 CFR 1060.505 - Other procedures.
Code of Federal Regulations, 2013 CFR
2013-07-01
... equipment will use another volatile liquid fuel instead of gasoline, use a test fuel that is representative... the test procedures to reflect the effects of using a fuel other than gasoline. (d) Approval. If we... CONTROL OF EVAPORATIVE EMISSIONS FROM NEW AND IN-USE NONROAD AND STATIONARY EQUIPMENT Test Procedures...
40 CFR 1060.505 - Other procedures.
Code of Federal Regulations, 2014 CFR
2014-07-01
... equipment will use another volatile liquid fuel instead of gasoline, use a test fuel that is representative... the test procedures to reflect the effects of using a fuel other than gasoline. (d) Approval. If we... CONTROL OF EVAPORATIVE EMISSIONS FROM NEW AND IN-USE NONROAD AND STATIONARY EQUIPMENT Test Procedures...
LPT. Low power test (TAN641) interior of mechanical equipment room. ...
LPT. Low power test (TAN-641) interior of mechanical equipment room. Air compressors in left foreground. Evaporate condenser in right background. Construction 93% complete. Photographer: Jack L. Anderson. Date: October 23, 1957. INEEL negative no. 57-5340 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID
78 FR 64295 - Energy Conservation Program: Test Procedure for Commercial Refrigeration Equipment
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-28
... amended under this section shall be reasonably designed to produce test results which measure energy... as members of the Working Group, in addition to two members from ASRAC, and one DOE representative... Energy Conservation Program: Test Procedure for Commercial Refrigeration Equipment; Proposed Rule #0;#0...
DOT National Transportation Integrated Search
2015-01-01
One of the objectives of this study was to evaluate soil testing equipment based on its capability of measuring in-place stiffness or modulus values. : As design criteria transition from empirical to mechanistic-empirical, soil test methods and equip...
40 CFR 600.110-08 - Equipment calibration.
Code of Federal Regulations, 2013 CFR
2013-07-01
... FUEL ECONOMY AND GREENHOUSE GAS EXHAUST EMISSIONS OF MOTOR VEHICLES Fuel Economy and Carbon-Related Exhaust Emission Test Procedures § 600.110-08 Equipment calibration. The equipment used for fuel economy...
40 CFR 600.110-08 - Equipment calibration.
Code of Federal Regulations, 2012 CFR
2012-07-01
... FUEL ECONOMY AND GREENHOUSE GAS EXHAUST EMISSIONS OF MOTOR VEHICLES Fuel Economy and Carbon-Related Exhaust Emission Test Procedures § 600.110-08 Equipment calibration. The equipment used for fuel economy...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-22
... Conservation Program for Certain Industrial Equipment: Energy Conservation Standards and Test Procedures for...-Conditioning Engineers (ASHRAE)/Illuminating Engineering Society of North America (IESNA) Standard 90.1-2010... Industrial Equipment, which includes the commercial heating, air-conditioning, and water-heating equipment...
33 CFR 104.260 - Security systems and equipment maintenance.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Security systems and equipment... systems and equipment maintenance. (a) Security systems and equipment must be in good working order and inspected, tested, calibrated and maintained according to the manufacturer's recommendation. (b) The results...
33 CFR 105.250 - Security systems and equipment maintenance.
Code of Federal Regulations, 2010 CFR
2010-07-01
... systems must be regularly tested in accordance with the manufacturers' recommendations; noted deficiencies... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Security systems and equipment... systems and equipment maintenance. (a) Security systems and equipment must be in good working order and...
7 CFR 800.217 - Equipment that shall be tested.
Code of Federal Regulations, 2010 CFR
2010-01-01
... of equipment and prototype equipment described in this section shall be performed in accordance with...) Prototype equipment—(1) At request of interested party. Upon request of a financially interested party and with the concurrence of the Administrator, prototype grain inspection or weighing equipment may be...
1985-05-20
APPENDIX B - POST-TEST CHECKLIST 1. Have test data been collected, recorded, and presented in accordance with this TOP? YES NO . Comment : 2. Have all...data collected been reviewed for correctness and completeness? YES NO . Comment : 3. Were the facilities, test equipment, instrumentation, and support...YES NO . Comment : 5. Were the test results compromised in any way due to test performance procedures? YES_ NO . Comment : 6. Were the test results
12. VIEW OF THE NONDESTRUCTIVE TESTING EQUIPMENT BEING USED TO ...
12. VIEW OF THE NON-DESTRUCTIVE TESTING EQUIPMENT BEING USED TO DETECT FLAWS IN FABRICATED COMPONENTS. (6/76) - Rocky Flats Plant, General Manufacturing, Support, Records-Central Computing, Southern portion of Plant, Golden, Jefferson County, CO
Critical Review of the ECSS-E-ST-20-07C ESD Test Set-Up for Testing Spacecraft Equipment
NASA Astrophysics Data System (ADS)
Pelissou, P.; Daout, B.; Romero, C.; Wolf, K.-F. J.
2016-05-01
Satellite equipment needs to be immune to electrostatic discharges (ESD) likely to occur in flight. Testing the susceptibility against ESD on spacecraft equipment is therefore an important part of the EMC test program. The test method according to ECSS-E-ST- 20-07C [1], which is commonly used in space industry, leaves undesirable degrees of freedom on how the test is performed, which in turn has an influence on the injected current and therefore on the test results. Because of the indirect coupling of ESD to circuits, the current waveform applied during the test and its repeatability are of high importance. In the frame of an ESTEC research contract (4000109887/13/NL/GLC), a critical review of the ECSS-E-ST-20-07C is performed to identify the influence factors which have an impact on the test repeatability.
30 CFR 75.1915 - Training and qualification of persons working on diesel-powered equipment.
Code of Federal Regulations, 2010 CFR
2010-07-01
... on diesel-powered equipment. 75.1915 Section 75.1915 Mineral Resources MINE SAFETY AND HEALTH... Diesel-Powered Equipment § 75.1915 Training and qualification of persons working on diesel-powered equipment. (a) To be qualified to perform maintenance, repairs, examinations and tests on diesel-powered...
30 CFR 75.1915 - Training and qualification of persons working on diesel-powered equipment.
Code of Federal Regulations, 2011 CFR
2011-07-01
... on diesel-powered equipment. 75.1915 Section 75.1915 Mineral Resources MINE SAFETY AND HEALTH... Diesel-Powered Equipment § 75.1915 Training and qualification of persons working on diesel-powered equipment. (a) To be qualified to perform maintenance, repairs, examinations and tests on diesel-powered...
30 CFR 75.1914 - Maintenance of diesel-powered equipment.
Code of Federal Regulations, 2010 CFR
2010-07-01
... written standard operating procedures for such testing and evaluation that specify the following: (1) The... MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Diesel-Powered Equipment § 75... the equipment is operated. (d) The intake air filter on diesel-powered equipment shall be replaced or...
30 CFR 75.1914 - Maintenance of diesel-powered equipment.
Code of Federal Regulations, 2012 CFR
2012-07-01
... written standard operating procedures for such testing and evaluation that specify the following: (1) The... MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Diesel-Powered Equipment § 75... the equipment is operated. (d) The intake air filter on diesel-powered equipment shall be replaced or...
30 CFR 75.1914 - Maintenance of diesel-powered equipment.
Code of Federal Regulations, 2013 CFR
2013-07-01
... written standard operating procedures for such testing and evaluation that specify the following: (1) The... MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Diesel-Powered Equipment § 75... the equipment is operated. (d) The intake air filter on diesel-powered equipment shall be replaced or...
30 CFR 75.1914 - Maintenance of diesel-powered equipment.
Code of Federal Regulations, 2011 CFR
2011-07-01
... written standard operating procedures for such testing and evaluation that specify the following: (1) The... MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Diesel-Powered Equipment § 75... the equipment is operated. (d) The intake air filter on diesel-powered equipment shall be replaced or...
30 CFR 75.1914 - Maintenance of diesel-powered equipment.
Code of Federal Regulations, 2014 CFR
2014-07-01
... written standard operating procedures for such testing and evaluation that specify the following: (1) The... MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Diesel-Powered Equipment § 75... the equipment is operated. (d) The intake air filter on diesel-powered equipment shall be replaced or...
30 CFR 18.4 - Electrical equipment for which approval is issued.
Code of Federal Regulations, 2010 CFR
2010-07-01
... TESTING, EVALUATION, AND APPROVAL OF MINING PRODUCTS ELECTRIC MOTOR-DRIVEN MINE EQUIPMENT AND ACCESSORIES General Provisions § 18.4 Electrical equipment for which approval is issued. An approval will be issued... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Electrical equipment for which approval is...
40 CFR 63.6655 - What records must I keep?
Code of Federal Regulations, 2010 CFR
2010-07-01
... equipment) or the air pollution control and monitoring equipment. (3) Records of performance tests and... on the air pollution control and monitoring equipment. (5) Records of actions taken during periods of... malfunctioning process and air pollution control and monitoring equipment to its normal or usual manner of...
40 CFR 63.6655 - What records must I keep?
Code of Federal Regulations, 2013 CFR
2013-07-01
... equipment) or the air pollution control and monitoring equipment. (3) Records of performance tests and... on the air pollution control and monitoring equipment. (5) Records of actions taken during periods of... malfunctioning process and air pollution control and monitoring equipment to its normal or usual manner of...
76 FR 68376 - Recoupment of Nonrecurring Costs (NCs) on Sales of U.S. Items
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-04
... expenditures for machine tools, capital equipment, or facilities for which contractor rental payments are made.... Major defense equipment. Any item of significant military equipment on the United States Munitions List... the major defense equipment dollar threshold for research, development, test, and evaluation shall be...
ERIC Educational Resources Information Center
Manpower Administration (DOL), Washington, DC. U.S. Training and Employment Service.
The United States Training and Employment Service General Aptitude Test Battery (GATB), first published in 1947, has been included in a continuing program of research to validate the tests against success in many different occupations. The GATB consists of 12 tests which measure nine aptitudes: General Learning Ability; Verbal Aptitude; Numerical…
ERIC Educational Resources Information Center
Manpower Administration (DOL), Washington, DC. U.S. Training and Employment Service.
The United States Training and Employment Service General Aptitude Test Battery (GATB), first published in 1947, has been included in a continuing program of research to validate the tests against success in many different occupations. The GATB consists of 12 tests which measure nine aptitudes: General Learning Ability; Verbal Aptitude; Numerical…
A&M. Jet engine test building (TAN609). Exterior. Equipment inside rollup ...
A&M. Jet engine test building (TAN-609). Exterior. Equipment inside roll-up door is blowdown test facility, part of loft-semiscale program. Note width of central section serving as blast protection for operator on left side. Photographer: Cahoon. Date: July 22, 1965. INEEL negative no. 65-3703 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID
ERIC Educational Resources Information Center
Manpower Administration (DOL), Washington, DC. U.S. Training and Employment Service.
The United States Training and Employment Service General Aptitude Test Battery (GATB), first published in 1947, has been included in a continuing program of research to validate the tests against success in many different occupations. The GATB consists of 12 tests which measure nine aptitudes: General Learning Ability; Verbal Aptitude; Numerical…
Research on the use of data fusion technology to evaluate the state of electromechanical equipment
NASA Astrophysics Data System (ADS)
Lin, Lin
2018-04-01
Aiming at the problems of different testing information modes and the coexistence of quantitative and qualitative information in the state evaluation of electromechanical equipment, the paper proposes the use of data fusion technology to evaluate the state of electromechanical equipment. This paper introduces the state evaluation process of mechanical and electrical equipment in detail, uses the D-S evidence theory to fuse the decision-making layers of mechanical and electrical equipment state evaluation and carries out simulation tests. The simulation results show that it is feasible and effective to apply the data fusion technology to the state evaluation of the mechatronic equipment. After the multiple decision-making information provided by different evaluation methods are fused repeatedly and the useful information is extracted repeatedly, the fuzziness of judgment can be reduced and the state evaluation Credibility.
A Review of International Space Station Habitable Element Equipment Offgassing Characteristics
NASA Technical Reports Server (NTRS)
Perry, Jay L.
2010-01-01
Crewed spacecraft trace contaminant control employs both passive and active methods to achieve acceptable cabin atmospheric quality. Passive methods include carefully selecting materials of construction, employing clean manufacturing practices, and minimizing systems and payload operational impacts to the cabin environment. Materials selection and manufacturing processes constitute the first level of equipment offgassing control. An element-level equipment offgassing test provides preflight verification that passive controls have been successful. Offgassing test results from multiple International Space Station (ISS) habitable elements and cargo vehicles are summarized and implications for active contamination control equipment design are discussed
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-26
...) by ensuring that any non-grooved drum design is still shown at the prototype testing phase to be as... equivalent) will no longer be available for purchase. Only the non-galvanized, corrosion-resistant mechanisms... affecting design, performance, and testing for such lifesaving equipment, and to clarify the requirements...
The overall objective of the Environmental Testing and Verification Coatings and Coating Equipment Program is to verify pollution prevention and performance characteristics of coating technologies and make the results of the testing available to prospective coating technology use...
46 CFR 159.007-5 - Production inspections and tests: Application for acceptance.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 6 2010-10-01 2010-10-01 false Production inspections and tests: Application for acceptance. 159.007-5 Section 159.007-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL APPROVAL OF EQUIPMENT AND MATERIALS Production Inspection and Tests of Approved...
46 CFR 160.017-27 - Production tests and examination.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 6 2010-10-01 2010-10-01 false Production tests and examination. 160.017-27 Section 160.017-27 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Chain Ladder § 160.017-27 Production tests and examination. (a) General. Each ladder...
46 CFR 159.007-3 - Production inspections and tests: Independent laboratory's procedures.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 6 2011-10-01 2011-10-01 false Production inspections and tests: Independent laboratory's procedures. 159.007-3 Section 159.007-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL APPROVAL OF EQUIPMENT AND MATERIALS Production Inspection and Tests of...
46 CFR 160.017-27 - Production tests and examination.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 6 2011-10-01 2011-10-01 false Production tests and examination. 160.017-27 Section 160.017-27 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Chain Ladder § 160.017-27 Production tests and examination. (a) General. Each ladder...
46 CFR 160.023-4 - Approval and production tests.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 6 2010-10-01 2010-10-01 false Approval and production tests. 160.023-4 Section 160.023-4 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Hand Combination Flare and Smoke Distress Signals § 160.023-4 Approval and production tests...
46 CFR 159.007-5 - Production inspections and tests: Application for acceptance.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 6 2011-10-01 2011-10-01 false Production inspections and tests: Application for acceptance. 159.007-5 Section 159.007-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL APPROVAL OF EQUIPMENT AND MATERIALS Production Inspection and Tests of Approved...
46 CFR 159.007-3 - Production inspections and tests: Independent laboratory's procedures.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 6 2010-10-01 2010-10-01 false Production inspections and tests: Independent laboratory's procedures. 159.007-3 Section 159.007-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL APPROVAL OF EQUIPMENT AND MATERIALS Production Inspection and Tests of...
46 CFR 160.022-4 - Approval and production tests.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 6 2011-10-01 2011-10-01 false Approval and production tests. 160.022-4 Section 160.022-4 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Floating Orange Smoke Distress Signals (5 Minutes) § 160.022-4 Approval and production test...
46 CFR 159.005-9 - Approval inspections and tests.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 6 2011-10-01 2011-10-01 false Approval inspections and tests. 159.005-9 Section 159.005-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL APPROVAL OF EQUIPMENT AND MATERIALS Approval Procedures § 159.005-9 Approval inspections and tests. (a) Each...
46 CFR 160.023-4 - Approval and production tests.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 6 2011-10-01 2011-10-01 false Approval and production tests. 160.023-4 Section 160.023-4 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Hand Combination Flare and Smoke Distress Signals § 160.023-4 Approval and production tests...
46 CFR 160.028-4 - Approval and production tests.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 6 2010-10-01 2010-10-01 false Approval and production tests. 160.028-4 Section 160.028-4 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Signal Pistols for Red Flare Distress Signals § 160.028-4 Approval and production tests. (a...
46 CFR 159.005-9 - Approval inspections and tests.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 6 2010-10-01 2010-10-01 false Approval inspections and tests. 159.005-9 Section 159.005-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL APPROVAL OF EQUIPMENT AND MATERIALS Approval Procedures § 159.005-9 Approval inspections and tests. (a) Each...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-21
... equipment used to test cell phones and communications equipment, machines that determine the contents of... employ various analytical techniques to test samples of many types, are used by academic researchers... require the sensitivity provided by ICP-MS, and because many customers perform tests pursuant to...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-08
... test units'' from a supplier located in China.\\16\\ Share indicated that it had offered only three units... certain apparent discrepancies between the application, test report, and equipment certification as to the... description of the product: ``computer peripheral for preprocessing data.'' \\25\\ Similarly, the test report...
46 CFR 161.010-2 - Design, construction, and test requirements.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 6 2013-10-01 2013-10-01 false Design, construction, and test requirements. 161.010-2 Section 161.010-2 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL ELECTRICAL EQUIPMENT Floating Electric Waterlight § 161.010-2 Design, construction, and test...
46 CFR 161.010-2 - Design, construction, and test requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 6 2010-10-01 2010-10-01 false Design, construction, and test requirements. 161.010-2 Section 161.010-2 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL ELECTRICAL EQUIPMENT Floating Electric Waterlight § 161.010-2 Design, construction, and test...
46 CFR 161.010-2 - Design, construction, and test requirements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 6 2014-10-01 2014-10-01 false Design, construction, and test requirements. 161.010-2 Section 161.010-2 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL ELECTRICAL EQUIPMENT Floating Electric Waterlight § 161.010-2 Design, construction, and test...
46 CFR 161.010-2 - Design, construction, and test requirements.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 6 2011-10-01 2011-10-01 false Design, construction, and test requirements. 161.010-2 Section 161.010-2 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL ELECTRICAL EQUIPMENT Floating Electric Waterlight § 161.010-2 Design, construction, and test...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-31
... Conservation Program: Test Procedure and Energy Conservation Standard for Set-Top Boxes and Network Equipment... comments on the request for information pertaining to the development of test procedures and energy conservation standards for set-top boxes and network equipment. The comment period is extended to March 15...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Raimondo, E.; Capman, J.L.; Herovard, M.
1985-05-01
Requirements for qualification of electrical equipment used in French-built nuclear power plants are stated in a national code, the RCC-E, or Regles de Construction et de Conception des Materiels Electriques. Under the RCC-E, safety related equipment is assigned to one of three different categories, according to location in the plant and anticipated normal, accident and post-accident behavior. Qualification tests differ for each category and procedures range in scope from the standard seismic test to the highly stringent VISA program, which specifies a predetermined sequence of aging, radiation, seismic and simulated accident testing. A network of official French test facilities wasmore » developed specifically to meet RCC-E requirements.« less
Safety validation test equipment operation
NASA Astrophysics Data System (ADS)
Kurosaki, Tadaaki; Watanabe, Takashi
1992-08-01
An overview of the activities conducted on safety validation test equipment operation for materials used for NASA manned missions is presented. Safety validation tests, such as flammability, odor, offgassing, and so forth were conducted in accordance with NASA-NHB-8060.1C using test subjects common with those used by NASA, and the equipment used were qualified for their functions and performances in accordance with NASDA-CR-99124 'Safety Validation Test Qualification Procedures.' Test procedure systems were established by preparing 'Common Procedures for Safety Validation Test' as well as test procedures for flammability, offgassing, and odor tests. The test operation organization chaired by the General Manager of the Parts and Material Laboratory of NASDA (National Space Development Agency of Japan) was established, and the test leaders and operators in the organization were qualified in accordance with the specified procedures. One-hundred-one tests had been conducted so far by the Parts and Material Laboratory according to the request submitted by the manufacturers through the Space Station Group and the Safety and Product Assurance for Manned Systems Office.
7 CFR 3300.73 - Period of validity of certificates.
Code of Federal Regulations, 2012 CFR
2012-01-01
... EQUIPMENT TO BE USED FOR SUCH CARRIAGE (ATP); INSPECTION, TESTING, AND CERTIFICATION OF SPECIAL EQUIPMENT Certification of New Equipment § 3300.73 Period of validity of certificates. In accordance with ATP, Annex 1...
7 CFR 3300.73 - Period of validity of certificates.
Code of Federal Regulations, 2013 CFR
2013-01-01
... EQUIPMENT TO BE USED FOR SUCH CARRIAGE (ATP); INSPECTION, TESTING, AND CERTIFICATION OF SPECIAL EQUIPMENT Certification of New Equipment § 3300.73 Period of validity of certificates. In accordance with ATP, Annex 1...
7 CFR 3300.73 - Period of validity of certificates.
Code of Federal Regulations, 2010 CFR
2010-01-01
... EQUIPMENT TO BE USED FOR SUCH CARRIAGE (ATP); INSPECTION, TESTING, AND CERTIFICATION OF SPECIAL EQUIPMENT Certification of New Equipment § 3300.73 Period of validity of certificates. In accordance with ATP, Annex 1...
7 CFR 3300.73 - Period of validity of certificates.
Code of Federal Regulations, 2011 CFR
2011-01-01
... EQUIPMENT TO BE USED FOR SUCH CARRIAGE (ATP); INSPECTION, TESTING, AND CERTIFICATION OF SPECIAL EQUIPMENT Certification of New Equipment § 3300.73 Period of validity of certificates. In accordance with ATP, Annex 1...
7 CFR 3300.73 - Period of validity of certificates.
Code of Federal Regulations, 2014 CFR
2014-01-01
... EQUIPMENT TO BE USED FOR SUCH CARRIAGE (ATP); INSPECTION, TESTING, AND CERTIFICATION OF SPECIAL EQUIPMENT Certification of New Equipment § 3300.73 Period of validity of certificates. In accordance with ATP, Annex 1...
Your Medicare Coverage: Durable Medical Equipment (DME) Coverage
... test, item, or service covered? Go Durable medical equipment (DME) coverage How often is it covered? Medicare ... B (Medical Insurance) covers medically necessary durable medical equipment (DME) that your doctor prescribes for use in ...
NASA Astrophysics Data System (ADS)
Shi, Sheng-bing; Chen, Zhen-xing; Qin, Shao-gang; Song, Chun-yan; Jiang, Yun-hong
2014-09-01
With the development of science and technology, photoelectric equipment comprises visible system, infrared system, laser system and so on, integration, information and complication are higher than past. Parallelism and jumpiness of optical axis are important performance of photoelectric equipment,directly affect aim, ranging, orientation and so on. Jumpiness of optical axis directly affect hit precision of accurate point damage weapon, but we lack the facility which is used for testing this performance. In this paper, test system which is used fo testing parallelism and jumpiness of optical axis is devised, accurate aim isn't necessary and data processing are digital in the course of testing parallelism, it can finish directly testing parallelism of multi-axes, aim axis and laser emission axis, parallelism of laser emission axis and laser receiving axis and first acuualizes jumpiness of optical axis of optical sighting device, it's a universal test system.
Realistic Development and Testing of Fission System at a Non-Nuclear Testing Facility
NASA Technical Reports Server (NTRS)
Godfroy, Tom; VanDyke, Melissa; Dickens, Ricky; Pedersen, Kevin; Lenard, Roger; Houts, Mike
2000-01-01
The use of resistance heaters to simulate heat from fission allows extensive development of fission systems to be performed in non-nuclear test facilities, saving time and money. Resistance heated tests on a module has been performed at the Marshall Space Flight Center in the Propellant Energy Source Testbed (PEST). This paper discusses the experimental facilities and equipment used for performing resistance heated tests. Recommendations are made for improving non-nuclear test facilities and equipment for simulated testing of nuclear systems.
Hanford spent nuclear fuel hot conditioning system test procedure
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cleveland, K.J.
1997-09-16
This document provides the test procedures for cold testing of the prototype Hot Conditioning System (HCS) at the 306E Facility. The primary objective of this testing is to confirm design choices and provide data for the detailed design package prior to procurement of the process equipment. The current scope of testing in this document includes a fabricability study of the HCS, equipment performance testing of the HCS components, heat-up and cool-down cycle simulation, and robotic arm testing.
Realistic development and testing of fission systems at a non-nuclear testing facility
NASA Astrophysics Data System (ADS)
Godfroy, Tom; van Dyke, Melissa; Dickens, Ricky; Pedersen, Kevin; Lenard, Roger; Houts, Mike
2000-01-01
The use of resistance heaters to simulate heat from fission allows extensive development of fission systems to be performed in non-nuclear test facilities, saving time and money. Resistance heated tests on a module has been performed at the Marshall Space Flight Center in the Propellant Energy Source Testbed (PEST). This paper discusses the experimental facilities and equipment used for performing resistance heated tests. Recommendations are made for improving non-nuclear test facilities and equipment for simulated testing of nuclear systems. .
Characterization of equipment for shaping and imaging hadron minibeams
NASA Astrophysics Data System (ADS)
Pugatch, V.; Brons, S.; Campbell, M.; Kovalchuk, O.; Llopart, X.; Martínez-Rovira, I.; Momot, Ie.; Okhrimenko, O.; Prezado, Y.; Sorokin, Yu.
2017-11-01
For the feasibility studies of spatially fractionated hadron therapy prototypes of the equipment for hadron minibeams shaping and monitoring have been designed, built and tested. The collimators design was based on Monte Carlo simulations (Gate v.6.2). Slit and matrix collimators were used for minibeams shaping. Gafchromic films, micropixel detectors Timepix in a hybrid as well as metal mode were tested for measuring hadrons intensity distribution in minibeams. An overall beam profile was measured by the metal microstrip detector. The performance of a mini-beams shaping and monitoring equipment was characterized exploring low energy protons at the KINR Tandem generator as well as high energy carbon and oxygen ion beams at HIT (Heidelberg). The results demonstrate reliable performance of the tested equipment for shaping and imaging hadron mini-beam structures.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-10
... equipment. (1) (Tier 2) Production equipment, tooling, and test equipment ``specially designed'' for armored... designed'' for the articles controlled in this Category. Note 1 to paragraph (b): For production of major..., inspection and production equipment ``specially designed'' for a subsystem or component not specifically...
46 CFR 78.17-80 - Firefighting equipment, general.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 3 2010-10-01 2010-10-01 false Firefighting equipment, general. 78.17-80 Section 78.17... Tests, Drills, and Inspections § 78.17-80 Firefighting equipment, general. (a) It shall be the duty of the owner, master, or person in charge to see that the vessel's firefighting equipment is at all times...
46 CFR 71.25-25 - Hull equipment.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 3 2010-10-01 2010-10-01 false Hull equipment. 71.25-25 Section 71.25-25 Shipping COAST... Inspection § 71.25-25 Hull equipment. (a) At each annual inspection, the inspector shall conduct the following tests and inspections of hull equipment: (1) All subdivision bulkheads shall be examined to...
Performance Testing Updates in Head, Face, and Eye Protection
2001-01-01
Objective: To describe the evolution and implementation of standards for head, face, and eye protection in sports. Background: Recent changes in testing standards for head, face, and eye protection include the development of new equipment, the mandating of tougher standards, and the coverage of additional products by these standards, all in an effort to improve athletes' safety and reduce their risk of injury. The person selecting equipment needs to understand these standards, how they are developed for each piece of equipment, and which standards the piece of equipment is purported to meet. Conclusions/Recommendations: The sports medicine clinician must recommend only the use of personal protective equipment that meets a current standard; must ensure that the equipment is maintained in its original form and that all parts and labels are present; and must ascertain that equipment is refurbished by a qualified reconditioner. By following these guidelines, we improve sport safety for our athletes and lessen their risk of injury. PMID:12937504
ISS and STS Commercial Off-the-Shelf Router Testing
NASA Technical Reports Server (NTRS)
Ivancie, William D.; Bell, Terry L.; Shell, Dan
2002-01-01
This report documents the results of testing performed with commercial off-the-shelf (COTS) routers and Internet Protocols (IPs) to determine if COTS equipment and IP could be utilized to upgrade NASA's current Space Transportation System (STS), the Shuttle, and the International Space Station communication infrastructure. Testing was performed by NASA Glenn Research Center (GRC) personnel within the Electronic Systems Test Laboratory (ESTE) with cooperation from the Mission Operations Directorate (MOD) Qualification and Utilization of Electronic System Technology (QUEST) personnel. The ESTE testing occurred between November 1 and 9, 2000. Additional testing was performed at NASA Glenn Research Center in a laboratory environment with equipment configured to emulate the STS. This report documents those tests and includes detailed test procedures, equipment interface requirements, test configurations and test results. The tests showed that a COTS router and standard Transmission Control Protocols and Internet Protocols (TCP/IP) could be used for both the Shuttle and the Space Station if near-error-free radio links are provided.
Developing and Testing SpaceWire Devices and Networks
NASA Astrophysics Data System (ADS)
Parkes, Steve; Mills, Stuart
2014-08-01
SpaceWire is a data-handling network for use on-board spacecraft, which connects together instruments, mass- memory, processors, downlink telemetry, and other on- board sub-systems [1]. SpaceWire is simple to implement and has some specific characteristics that help it support data-handling applications in space: high-speed, low-power, simplicity, relatively low implementation cost, and architectural flexibility making it ideal for many space missions. SpaceWire provides high-speed (2 Mbits/s to 200 Mbits/s), bi- directional, full-duplex data-links, which connect together SpaceWire enabled equipment. Data-handling networks can be built to suit particular applications using point-to-point data-links and routing switches.Since the SpaceWire standard was published in January 2003, it has been adopted by ESA, NASA, JAXA and RosCosmos for many missions and is being widely used on scientific, Earth observation, commercial and other spacecraft. High-profile missions using SpaceWire include: Gaia, ExoMars rover, Bepi- Colombo, James Webb Space Telescope, GOES-R, Lunar Reconnaissance Orbiter and Astro-H.The development and testing of the SpaceWire links and networks used on these and many other spacecraft currently under development, requires a comprehensive array of test equipment. In this paper the requirements for test equipment fulfilling key test functions are outlined and then equipment that meets these requirements is described. Finally the all-important software that operates with the test equipment is introduced.
8. VIEW OF RADIOGRAPHY EQUIPMENT, TEST METHODS INCLUDED RADIOGRAPHY AND ...
8. VIEW OF RADIOGRAPHY EQUIPMENT, TEST METHODS INCLUDED RADIOGRAPHY AND BETA BACKSCATTERING. (7/13/56) - Rocky Flats Plant, Non-Nuclear Production Facility, South of Cottonwood Avenue, west of Seventh Avenue & east of Building 460, Golden, Jefferson County, CO
Demonstration and purchase of PG binder testing equipment phase 1 and 2 : final report.
DOT National Transportation Integrated Search
2014-04-01
A pooled fund project was undertaken to purchase new asphalt binder testing equipment for state : transportation agencies. The seven states that agreed to participate included: Connecticut, : Maine, Massachusetts, New Hampshire, New York, Rhode Islan...
DETAIL VIEW OF TESTING EQUIPMENT, REMOTE MANIPULATOR SYSTEM LAB, ROOM ...
DETAIL VIEW OF TESTING EQUIPMENT, REMOTE MANIPULATOR SYSTEM LAB, ROOM NO. 1N4, FACING SOUTHEAST - Cape Canaveral Air Force Station, Launch Complex 39, Vehicle Assembly Building, VAB Road, East of Kennedy Parkway North, Cape Canaveral, Brevard County, FL
1959-07-01
Nevada Test Site. ditions, available equipment and material , and late criteria changes requesifd by the partici- "The Nevada tests will e held during...by visory personnel. H&N Field Engineers or the H&N Material TestsResident Engineer. The majority of material tests consisted of 3. Reports and...procurement of material and hol, date of request, date rquired, work to be equipment to be used in the test facilities pro- performed, and site or station
Preliminary tests of vulnerability of typical aircraft electronics to lightning-induced voltages
NASA Technical Reports Server (NTRS)
Plumer, J. A.; Walko, L. C.
1974-01-01
Tests made on two pieces of typical aircraft electronics equipment to ascertain their vulnerability to simulated lightning-induced transient voltages representative of those which might occur in flight when the aircraft is struck by lightning were conducted. The test results demonstrated that such equipment can be interfered with or damaged by transient voltages as low as 21 volts peak. Greater voltages can cause failure of semiconductor components within the equipment. The results emphasize a need for establishment of coordinated system susceptibility and component vulnerability criteria to achieve lightning protection of aerospace electrical and electronic systems.
NASA Astrophysics Data System (ADS)
Clark, T. L.; McCollum, M. B.; Trout, D. H.; Javor, K.
1995-06-01
The purpose of the MEDIC Handbook is to provide practical and helpful information in the design of electrical equipment for electromagnetic compatibility (EMS). Included is the definition of electromagnetic interference (EMI) terms and units as well as an explanation of the basic EMI interactions. An overview of typical NASA EMI test requirements and associated test setups is given. General design techniques to minimize the risk of EMI and EMI suppression techniques at the board and equipment interface levels are presented. The Handbook contains specific EMI test compliance design techniques and retrofit fixes for noncompliant equipment. Also presented are special tests that are useful in the design process or in instances of specification noncompliance.
NASA Technical Reports Server (NTRS)
Clark, T. L.; Mccollum, M. B.; Trout, D. H.; Javor, K.
1995-01-01
The purpose of the MEDIC Handbook is to provide practical and helpful information in the design of electrical equipment for electromagnetic compatibility (EMS). Included is the definition of electromagnetic interference (EMI) terms and units as well as an explanation of the basic EMI interactions. An overview of typical NASA EMI test requirements and associated test setups is given. General design techniques to minimize the risk of EMI and EMI suppression techniques at the board and equipment interface levels are presented. The Handbook contains specific EMI test compliance design techniques and retrofit fixes for noncompliant equipment. Also presented are special tests that are useful in the design process or in instances of specification noncompliance.
16 CFR 1209.37 - Corrective actions.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION CONSUMER PRODUCT SAFETY ACT REGULATIONS INTERIM SAFETY STANDARD FOR CELLULOSE INSULATION Certification § 1209.37 Corrective actions. (a) Test failure... insulation product itself. Corrective action may consist of equipment adjustment, equipment repair, equipment...
Manning, T.K.; Smith, K.E.; Wood, C.D.; Williams, J.B.
1994-01-01
Water-quality samples were collected from Chicod Creek in the Coastal Plain Province of North Carolina during the summer of 1992 as part of the U.S. Geological Survey's National Water-Quality Assessment Program. Chicod Creek is in the Albemarle-Pamlico drainage area, one of four study units designated to test equipment and procedures for collecting and processing samples for the solid-phase extraction of selected pesticides, The equipment and procedures were used to isolate 47 pesticides, including organonitrogen, carbamate, organochlorine, organophosphate, and other compounds, targeted to be analyzed by gas chromatography/mass spectrometry. Sample-collection and processing equipment equipment cleaning and set-up procedures, methods pertaining to collecting, splitting, and solid-phase extraction of samples, and water-quality data resulting from the field test are presented in this report Most problems encountered during this intensive sampling exercise were operational difficulties relating to equipment used to process samples.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Castaldini, C.; Waterland, L.R.; Lips, H.I.
1986-02-01
The report discusses results from sampling flue gas from an enhanced-oil-recovery steam generator (EOR steamer) equipped with an MHI PM low-NOx burner. The tests included burner performance/emission mapping tests, comparative testing of an identical steamer equipped with a conventional burner, and comprehensive testing of the low-NOx-burner-equipped steamer. Comprehensive test measurements included continuous flue-gas monitoring; source assessment sampling system testing with subsequent laboratory analysis to give total flue-gas organics in two boiling point ranges and specific quantitation on the semivolatile organic priority pollutants; C1 to C6 hydrocarbon sampling; Methods 5/8 sampling for particulate and SO/sub 2/ and SO/sub 3/ emissions; andmore » emitted particle size distribution tests using Andersen impactors. Full-load NOx emissions of 110 ppm (3% O/sub 2/) could be maintained from the low-NOx burner at acceptable CO and smoke emissions, compared to about 300 ppm (3% O/sub 2/) from the conventional-burner-equipped steamer. At the low-NOx condition, CO, SO/sub 2/, and SO/sub 3/ emissions were 93, 594, and 3.1 ppm, respectively. Particulate emissions were 39 mg/dscm with a mean particle diameter of 3 to 4 micrometers. Total organic emissions were 11.1 mg/dscm, almost exclusively volatile (C1 to C6) organics. Three PAHs were detected at from 0.1 to 1.4 micrograms/dscm.« less
NASA ground terminal communication equipment automated fault isolation expert systems
NASA Technical Reports Server (NTRS)
Tang, Y. K.; Wetzel, C. R.
1990-01-01
The prototype expert systems are described that diagnose the Distribution and Switching System I and II (DSS1 and DSS2), Statistical Multiplexers (SM), and Multiplexer and Demultiplexer systems (MDM) at the NASA Ground Terminal (NGT). A system level fault isolation expert system monitors the activities of a selected data stream, verifies that the fault exists in the NGT and identifies the faulty equipment. Equipment level fault isolation expert systems are invoked to isolate the fault to a Line Replaceable Unit (LRU) level. Input and sometimes output data stream activities for the equipment are available. The system level fault isolation expert system compares the equipment input and output status for a data stream and performs loopback tests (if necessary) to isolate the faulty equipment. The equipment level fault isolation system utilizes the process of elimination and/or the maintenance personnel's fault isolation experience stored in its knowledge base. The DSS1, DSS2 and SM fault isolation systems, using the knowledge of the current equipment configuration and the equipment circuitry issues a set of test connections according to the predefined rules. The faulty component or board can be identified by the expert system by analyzing the test results. The MDM fault isolation system correlates the failure symptoms with the faulty component based on maintenance personnel experience. The faulty component can be determined by knowing the failure symptoms. The DSS1, DSS2, SM, and MDM equipment simulators are implemented in PASCAL. The DSS1 fault isolation expert system was converted to C language from VP-Expert and integrated into the NGT automation software for offline switch diagnoses. Potentially, the NGT fault isolation algorithms can be used for the DSS1, SM, amd MDM located at Goddard Space Flight Center (GSFC).
Shuttle orbiter S-band communications equipment design evaluation
NASA Technical Reports Server (NTRS)
Springett, J. C.
1979-01-01
An assessment of S-band communication equipment includes: (1) the review and analysis of the ability of the various subsystem avionic equipment designs to interface with, and operate on signals from/to adjoining equipment; (2) the performance peculiarities of the hardware against the overall specified system requirements; and (3) the evaluation of EMC EMI test results of the various equipment with respect to the possibility of mutual interferences.
Code of Federal Regulations, 2011 CFR
2011-01-01
..., packaged terminal air conditioners, and packaged terminal heat pumps. 431.96 Section 431.96 Energy... EQUIPMENT Commercial Air Conditioners and Heat Pumps Test Procedures § 431.96 Uniform test method for the... heating equipment, packaged terminal air conditioners, and packaged terminal heat pumps. (a) Scope. This...
Code of Federal Regulations, 2012 CFR
2012-01-01
..., packaged terminal air conditioners, and packaged terminal heat pumps. 431.96 Section 431.96 Energy... EQUIPMENT Commercial Air Conditioners and Heat Pumps Test Procedures § 431.96 Uniform test method for the... heating equipment, packaged terminal air conditioners, and packaged terminal heat pumps. (a) Scope. This...
ERIC Educational Resources Information Center
Groseclose, Richard
This fourth in a series of six modules for a course titled Nondestructive Examination (NDE) Techniques II describes the specific technique variables and options which are available to the test technician, provides instructions for selecting and operating the appropriate test equipment, describes physical criteria for detectable discontinuities,…
Point-of-Care Test Equipment for Flexible Laboratory Automation.
You, Won Suk; Park, Jae Jun; Jin, Sung Moon; Ryew, Sung Moo; Choi, Hyouk Ryeol
2014-08-01
Blood tests are some of the core clinical laboratory tests for diagnosing patients. In hospitals, an automated process called total laboratory automation, which relies on a set of sophisticated equipment, is normally adopted for blood tests. Noting that the total laboratory automation system typically requires a large footprint and significant amount of power, slim and easy-to-move blood test equipment is necessary for specific demands such as emergency departments or small-size local clinics. In this article, we present a point-of-care test system that can provide flexibility and portability with low cost. First, the system components, including a reagent tray, dispensing module, microfluidic disk rotor, and photometry scanner, and their functions are explained. Then, a scheduler algorithm to provide a point-of-care test platform with an efficient test schedule to reduce test time is introduced. Finally, the results of diagnostic tests are presented to evaluate the system. © 2014 Society for Laboratory Automation and Screening.
Diagnosis - Using automatic test equipment and artificial intelligence expert systems
NASA Astrophysics Data System (ADS)
Ramsey, J. E., Jr.
Three expert systems (ATEOPS, ATEFEXPERS, and ATEFATLAS), which were created to direct automatic test equipment (ATE), are reviewed. The purpose of the project was to develop an expert system to troubleshoot the converter-programmer power supply card for the F-15 aircraft and have that expert system direct the automatic test equipment. Each expert system uses a different knowledge base or inference engine, basing the testing on the circuit schematic, test requirements document, or ATLAS code. Implementing generalized modules allows the expert systems to be used for any different unit under test. Using converted ATLAS to LISP code allows the expert system to direct any ATE using ATLAS. The constraint propagated frame system allows for the expansion of control by creating the ATLAS code, checking the code for good software engineering techniques, directing the ATE, and changing the test sequence as needed (planning).
2007-12-01
Program Manager PMO Program Manager Office POM Program Objective Memorandum PPE Personal Protective Equipment PPT Production Prove...test • Technical feasibility test • Engineering development test • Production prove-out test ( PPT ) • Software qualification test 22 • Live fire...improvement BIDS (P3I) system is equipped with a detection suite to include high volume samplers, a fluorescent particle counter/sizer, a flow
48 CFR 9905.502-60 - Illustrations.
Code of Federal Regulations, 2013 CFR
2013-10-01
.... For example, the institution may use the number of transactions processed rather than its former... for the same purpose: (1) An educational institution normally allocates special test equipment costs directly to contracts. The costs of general purpose test equipment are normally included in the indirect...
48 CFR 9905.502-60 - Illustrations.
Code of Federal Regulations, 2010 CFR
2010-10-01
.... For example, the institution may use the number of transactions processed rather than its former... for the same purpose: (1) An educational institution normally allocates special test equipment costs directly to contracts. The costs of general purpose test equipment are normally included in the indirect...
48 CFR 9905.502-60 - Illustrations.
Code of Federal Regulations, 2014 CFR
2014-10-01
.... For example, the institution may use the number of transactions processed rather than its former... for the same purpose: (1) An educational institution normally allocates special test equipment costs directly to contracts. The costs of general purpose test equipment are normally included in the indirect...
Wooden Versus Plastic Apparatus with the GATB: A Restudy
ERIC Educational Resources Information Center
Trimmer, Harvey, Jr.
1974-01-01
Kapes and Sievert's (1973) research on the difference between wooden and plastic peg boards for the GATB is replicated. The results indicate that individuals tested on the wooden equipment perform significantly higher than those tested on the plastic equipment. (Author/PC)
ETR COMPRESSOR BUILDING, TRA643. COMPRESSORS AND OTHER EQUIPMENT INSTALLED. METAL ...
ETR COMPRESSOR BUILDING, TRA-643. COMPRESSORS AND OTHER EQUIPMENT INSTALLED. METAL ROOF AND CONCRETE BLOCK WALLS. INL NEGATIVE NO. 61-4536. Unknown Photographer, ca. 1961. - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
VIEW OF INTEGRITY TESTING EQUIPMENT UTILIZING CRYOGENIC BATHS IN BUILDING ...
VIEW OF INTEGRITY TESTING EQUIPMENT UTILIZING CRYOGENIC BATHS IN BUILDING 991. (6/7/68) - Rocky Flats Plant, Final Assembly & Shipping, Eastern portion of plant site, south of Spruce Avenue, east of Tenth Street & north of Central Avenue, Golden, Jefferson County, CO
Military Publications, Index of Test Operations Procedures
1981-10-01
AND RECORDING EQUIPMENT B033862L VOL X ELECTRONIC TEST EQUIPMENT BO33863L VOL XI MAINTENANCE OF ARMY AIRCRAFT; OPERATORS AND CREWMEMBERS MANUALS ...SYSTEMS 718646 6 JUN 68 6-2-186 (L) METEOROLOGICAL EQUIPMENT; METEOROLOGICAL STATIONS, MANUAL OR AUTOMATIC 870954 20 MAR 70 6-2-189 (L) METEOROLOGICAL...69 6-2-250 (L) RELAYS, RADIO 718622 16 APR 69 6-2-262 (L) SUPPRESSORS, VOLTAGE TRANSIENT 720578 MAR 67 6-2-265 (L) SWITCHBOARDS, MANUAL 718647 1 DEC
2010-05-01
decontaminate chemical and biological agents from sensitive equipment (avionics, electronics, electrical , and environmental systems and equipment...fabricated 2 x 2 in. square, 3/32 in. thick aluminum shims, augmented with electrical tape for added thickness as needed, were used in these tests to make...test coupons, thin custom-fabricated 2x2 in. square x 3/32 in. thick aluminum shims, augmented with electrical tape for added thickness as needed
Discussion of the quality control and performance testing of ultrasound diagnostic equipment
NASA Astrophysics Data System (ADS)
Jiang, Junjie
2018-03-01
In recent years, with the rapid development of ultrasonography, the application and popularization of new technology used in ultrasound equipment, the level of providing diagnostic information for doctors enhances unceasingly, which has become the indispensable diagnostic tool for medical institutions. The performance of equipment is directly related to the doctor’s diagnosis and the patient’s health, therefore, it is very important to choose a good method for quality control and performance testing.
78 FR 23226 - 36(b)(1) Arms Sales Notification
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-18
..., Communication, Computer and Intelligence/Communication, Navigational and Identification (C4I/CNI); Autonomic.../ integration, aircraft ferry and tanker support, support equipment, tools and test equipment, communication... aircraft equipment includes: Electronic Warfare Systems; Command, Control, Communication, Computer and...
Lightning testing at the subsystem level
NASA Technical Reports Server (NTRS)
Luteran, Frank
1991-01-01
Testing at the subsystem or black box level for lightning hardness is required if system hardness is to be assured at the system level. The often applied philosophy of lighting testing only at the system level leads to extensive end of the line design changes which result in excessive costs and time delays. In order to perform testing at the subsystem level two important factors must be defined to make the testing simulation meaningful. The first factor is the definition of the test stimulus appropriate to the subsystem level. Application of system level stimulations to the subsystem level usually leads to significant overdesign of the subsystem which is not necessary and may impair normal subsystem performance. The second factor is the availability of test equipment needed to provide the subsystem level lightning stimulation. Equipment for testing at this level should be portable or at least movable to enable efficient testing in a design laboratory environment. Large fixed test installations for system level tests are not readily available for use by the design engineers at the subsystem level and usually require special operating skills. The two factors, stimulation level and test equipment availability, must be evaluated together in order to produce a practical, workable test standard. The neglect or subordination of either factor will guarantee failure in generating the standard. It is not unusual to hear that test standards or specifications are waived because a specified stimulation level cannot be accomplished by in-house or independent test facilities. Determination of subsystem lightning simulation level requires a knowledge and evaluation of field coupling modes, peak and median levels of voltages and currents, bandwidths, and repetition rates. Practical limitations on test systems may require tradeoffs in lightning stimulation parameters in order to build practical test equipment. Peak power levels that can be generated at specified bandwidths with standard electrical components must be considered in the design and costing of the test system. Stimulation tests equipment and test methods are closely related and must be considered a test system for lightning simulation. A non-perfect specification that can be reliably and repeatedly applied at the subsystem test level is more desirable than a perfect specification that cannot be applied at all.
40 CFR 85.1412 - Maintenance and submittal of records for equipment certifiers.
Code of Federal Regulations, 2011 CFR
2011-07-01
... the equipment certifier has offered to sell its certified equipment for less than the life cycle cost... during testing of the equipment and subsequent analyses based on that data, including the mileage and the... taken in implementing the quality control plan, and any subsequent analyses of that data; and (6) All in...
Sand and Dust Testing of Wheeled and Tracked Vehicles and Stationary Equipment
2009-11-18
early stages of development of an automotive system or stationary equipment there may be components and sub-systems that need to be tested for...suitability to operate in dust before final prototypes are available for end item or system-level testing. At this stage of development, component or...Method 510, or TOP 1-2-621 does not include functional operation during active testing. Additionally, testing by using either of these two documents is
Equipment testing with damped sinewaves between 1 and 50 MHz
NASA Astrophysics Data System (ADS)
Hardwick, C. John; Baldwin, R. E.
1992-11-01
Present lightning equipment test standards such as RTCA DO160C call for damped sinusoidal tests at 1 and 10 MHz. There has been some discussion in the lightning community about extending these tests to 50 frequencies in the region 1-50 MHz. This paper presents characteristics of such tests on cable bundles and notes the relationship between bundle current and injected voltage; important parameters are the cable loss and Q of the driving waveform.
Coal feed component testing for CDIF
NASA Technical Reports Server (NTRS)
Pearson, C. V.; Snyder, B. K.; Fornek, T. E.
1977-01-01
Investigations conducted during the conceptual design of the Montana MHD Component Development and Integration Facility (CDIF) identified commercially available processing and feeding equipment potentially suitable for use in a reference design. Tests on sub-scale units of this equipment indicated that they would perform as intended.
46 CFR 160.066-15 - Production testing.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 6 2011-10-01 2011-10-01 false Production testing. 160.066-15 Section 160.066-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Distress Signal for Boats, Red Aerial Pyrotechnic Flare § 160...
46 CFR 160.066-15 - Production testing.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 6 2010-10-01 2010-10-01 false Production testing. 160.066-15 Section 160.066-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Distress Signal for Boats, Red Aerial Pyrotechnic Flare § 160...
48 CFR 242.202 - Assignment of contract administration.
Code of Federal Regulations, 2014 CFR
2014-10-01
..., charting, and geodesy services; (F) Base, post, camp, and station purchases; (G) Operation or maintenance... installation, test, and checkout of the missiles and associated equipment); (Q) Operation and maintenance of, or installation of equipment at, military test ranges, facilities, and installations; and (R) The...
48 CFR 242.202 - Assignment of contract administration.
Code of Federal Regulations, 2011 CFR
2011-10-01
..., charting, and geodesy services; (F) Base, post, camp, and station purchases; (G) Operation or maintenance... installation, test, and checkout of the missiles and associated equipment); (Q) Operation and maintenance of, or installation of equipment at, military test ranges, facilities, and installations; and (R) The...
48 CFR 242.202 - Assignment of contract administration.
Code of Federal Regulations, 2012 CFR
2012-10-01
..., charting, and geodesy services; (F) Base, post, camp, and station purchases; (G) Operation or maintenance... installation, test, and checkout of the missiles and associated equipment); (Q) Operation and maintenance of, or installation of equipment at, military test ranges, facilities, and installations; and (R) The...
48 CFR 242.202 - Assignment of contract administration.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., charting, and geodesy services; (F) Base, post, camp, and station purchases; (G) Operation or maintenance... installation, test, and checkout of the missiles and associated equipment); (Q) Operation and maintenance of, or installation of equipment at, military test ranges, facilities, and installations; and (R) The...
48 CFR 242.202 - Assignment of contract administration.
Code of Federal Regulations, 2013 CFR
2013-10-01
..., charting, and geodesy services; (F) Base, post, camp, and station purchases; (G) Operation or maintenance... installation, test, and checkout of the missiles and associated equipment); (Q) Operation and maintenance of, or installation of equipment at, military test ranges, facilities, and installations; and (R) The...
7 CFR 1726.402 - Equipment contract closeout.
Code of Federal Regulations, 2012 CFR
2012-01-01
..., DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract Closeout § 1726.402... inspection and testing of equipment. The borrower (acting through its engineer, if applicable) will perform... (acting through its engineer, if applicable) will schedule such inspection and testing at a time mutually...
7 CFR 1726.402 - Equipment contract closeout.
Code of Federal Regulations, 2010 CFR
2010-01-01
..., DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract Closeout § 1726.402... inspection and testing of equipment. The borrower (acting through its engineer, if applicable) will perform... (acting through its engineer, if applicable) will schedule such inspection and testing at a time mutually...
7 CFR 1726.402 - Equipment contract closeout.
Code of Federal Regulations, 2011 CFR
2011-01-01
..., DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract Closeout § 1726.402... inspection and testing of equipment. The borrower (acting through its engineer, if applicable) will perform... (acting through its engineer, if applicable) will schedule such inspection and testing at a time mutually...
7 CFR 1726.402 - Equipment contract closeout.
Code of Federal Regulations, 2014 CFR
2014-01-01
..., DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract Closeout § 1726.402... inspection and testing of equipment. The borrower (acting through its engineer, if applicable) will perform... (acting through its engineer, if applicable) will schedule such inspection and testing at a time mutually...
7 CFR 1726.402 - Equipment contract closeout.
Code of Federal Regulations, 2013 CFR
2013-01-01
..., DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract Closeout § 1726.402... inspection and testing of equipment. The borrower (acting through its engineer, if applicable) will perform... (acting through its engineer, if applicable) will schedule such inspection and testing at a time mutually...
46 CFR 160.023-4 - Approval and production tests.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 6 2012-10-01 2012-10-01 false Approval and production tests. 160.023-4 Section 160.023-4 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Hand Combination Flare and Smoke Distress...
46 CFR 160.023-4 - Approval and production tests.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 6 2013-10-01 2013-10-01 false Approval and production tests. 160.023-4 Section 160.023-4 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Hand Combination Flare and Smoke Distress...
46 CFR 160.023-4 - Approval and production tests.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 6 2014-10-01 2014-10-01 false Approval and production tests. 160.023-4 Section 160.023-4 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Hand Combination Flare and Smoke Distress...
46 CFR 131.590 - Firefighting equipment.
Code of Federal Regulations, 2010 CFR
2010-10-01
... performance of the tests and inspections of each portable fire extinguisher, semiportable fire extinguisher... master shall keep records of these tests and inspections, showing the dates of their performance, the... maintain the prescribed firefighting equipment in working order for use at any time when the vessel is...
76 FR 25657 - Cross-Waiver of Liability Clauses
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-05
... activities related to ground support, test, training, simulation, or guidance and control equipment and... process for use other than for ISS-related activities in implementation of the IGA. (8) ``Related Entity... activities related to ground support, test, training, simulation, or guidance and control equipment, and...
46 CFR 160.033-4 - Inspection and testing of mechanical disengaging apparatus.
Code of Federal Regulations, 2010 CFR
2010-10-01
... apparatus. 160.033-4 Section 160.033-4 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Mechanical Disengaging Apparatus, Lifeboat, for Merchant Vessels § 160.033-4 Inspection and testing of mechanical...
46 CFR 160.033-4 - Inspection and testing of mechanical disengaging apparatus.
Code of Federal Regulations, 2011 CFR
2011-10-01
... apparatus. 160.033-4 Section 160.033-4 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Mechanical Disengaging Apparatus, Lifeboat, for Merchant Vessels § 160.033-4 Inspection and testing of mechanical...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Umari, A.M.J.; Geldon, A.; Patterson, G.
1994-12-31
Yucca Mountain, Nevada, currently is being investigated by the U.S. Geological Survey as a potential site for a high-level nuclear waste repository. Planned hydraulic-stress and tracer tests in fractured, tuffaceous rocks below the water table at Yucca Mountain will require work at depths in excess of 1,300 feet. To facilitate prototype testing of equipment and methods to be used in aquifer tests at Yucca Mountain, an analog site was selected in the foothills of the Sierra Nevada near Raymond, California. Two of nine 250- to 300-feet deep wells drilled into fractured, granitic rocks at the Raymond site have been instrumentedmore » with packers, pressure transducers, and other equipment that will be used at Yucca Mountain. Aquifer tests conducted at the Raymond site to date have demonstrated a need to modify some of the equipment and methods conceived for use at Yucca Mountain.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1982-01-01
Foam spray equipment and materials for dust suppression on longwall double drum shearer faces have been procured. This equipment includes metering pumps, foam generators and mounting brackets, foam solutions, flow meters, real time and gravimetric sampling equipment, hoses and valve banks. Initial tests have been conducted in the laboratory with three types of generators and five types of foam solutions. Based on these tests, Senior Conflow's cluster spray and Onyx Chemical Company's millifoam solution have been selected. For pumping foam solution to the shearer, Jon Bean's 2 hp, 120 VAC single-phase ceramic lined piston pump has been selected. For fieldmore » tests, equipment has been installed underground in Dobbin mine in Upper Freeport seam on Eickhoff EDW 300 double drum shearer. Foamspray tests have been conducted. Real time and gravimetric dust samples have been collected. Real time sampling results indicate a dust level reduction of up to 37 percent with foam spray compared to the base case of water sprays.« less
Equipment for testing automotive lead/acid batteries under SAE J240a conditions
NASA Astrophysics Data System (ADS)
Hamilton, J. A.; Rand, D. A. J.
Battery cycling equipment has been designed and constructed to test lead/acid batteries according to the American Society of Automotive Engineers' (SAE) J240a Standard. This life test simulates automotive service where the battery operates in a voltage-regulated charging system. The CSIRO design uses a master/slave concept to reduce both construction time and cost.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-03
... definitions (42 U.S.C. 6311), energy conservation standards (42 U.S.C. 6313), test procedures (42 U.S.C. 6314... operate. DOE notes that it has published an amended test procedure for commercial refrigeration equipment... amended test procedure will be required on the compliance date of any amended standards for this equipment...
Measurement environments and testing
NASA Astrophysics Data System (ADS)
Marvin, A. C.
1991-06-01
The various methods used to assess both the emission (interference generation) performance of electronic equipment and the immunity of electronic equipment to external electromagnetic interference are described. The measurement methods attempt to simulate realistic operating conditions for the equipment being tested, yet at the same time they must be repeatable and practical to operate. This has led to the development of a variety of test methods, each of which has its limitations. Concentration is on the most common measurement methods such as open-field test sites, screened enclosures and transverse electromagnetic (TEM) cells. The physical justification for the methods, their limitations, and measurement precision are described. Ways of relating similar measurements made by different methods are discussed, and some thoughts on future measurement improvements are presented.
Augmentor transient capability of an F100 engine equipped with a digital electronic engine control
NASA Technical Reports Server (NTRS)
Burcham, F. W., Jr.; Pai, G. D.
1984-01-01
An F100 augmented turbofan engine equipped with digital electronic engine control (DEEC) system was evaluated. The engine was equipped with a specially modified augmentor to provide improved steady state and transient augmentor capability. The combination of the DEEC and the modified augmentor was evaluated in sea level and altitude facility tests and then in four different flight phases in an F-15 aircraft. The augmentor configuration, logic, and test results are presented.
NASA Technical Reports Server (NTRS)
1976-01-01
Data base management techniques and applicable equipment are described. Recommendations which will assist potential NASA data users in selecting and using appropriate data base management tools and techniques are presented. Classes of currently available data processing equipment ranging from basic terminals to large minicomputer systems were surveyed as they apply to the needs of potential SEASAT data users. Cost and capabilities projections for this equipment through 1985 were presented. A test of a typical data base management system was described, as well as the results of this test and recommendations to assist potential users in determining when such a system is appropriate for their needs. The representative system tested was UNIVAC's DMS 1100.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Clark, Timothy C.; Comer, Kevin S.; Belden, Jr., William S.
2016-04-30
This three-year project developed and demonstrated four innovative, first-of-their-kind pieces of equipment that are aimed at significantly reducing the cost of delivered herbaceous biomass. This equipment included a Self-Propelled Baler (SPB), a Bale Picking Truck (BPT), a Self-Loading Trailer (SLT), and a Heavy Crop Header for harvesting high yielding energy crops. This equipment was designed and fabricated during the first two years of the project and demonstrated on available crops (corn stover, wheat straw, and warm season grasses) across the nation, as available. Operational performance and cost data was collected and analyzed throughout the project to measure the costs ofmore » baseline harvesting (using conventional harvesting equipment) and advanced harvesting with the newly developed equipment. This data revealed that the project met its original goal of developing equipment that is realistically capable of reducing the cost of delivered biomass by $13 per dry ton. Each machine was tested after fabrication and put to the test in one or more commercial harvesting seasons. During these tests, operational flaws were found and fixed through upgrades and improvements. The first new SPB, BPT, and two new SLTs were ready for use during the 2013 harvest season. Since then, over 40 SLTs have been ordered and are currently under fabrication. All of the equipment will be commercially available to the industry as demand increases.« less
Cellular telephone interference with medical equipment.
Tri, Jeffrey L; Severson, Rodney P; Firl, Allen R; Hayes, David L; Abenstein, John P
2005-10-01
To assess the potential electromagnetic interference (EMI) effects that new or current-generation cellular telephones have on medical devices. For this study, performed at the Mayo Clinic in Rochester, Minn, between March 9, 2004, and April 24, 2004, we tested 16 different medical devices with 6 cellular telephones to assess the potential for EMI. Two of the medical devices were tested with both new and old interface modules. The 6 cellular telephones chosen represent the different cellular technology protocols in use: Code Division Multiple Access (2 models), Global System for Mobile communications, Integrated Digital Enhanced Network, Time Division Multiple Access, and analog. The cellular telephones were tested when operating at or near their maximum power output. The medical devices, connected to clinical simulators during testing, were monitored by observing the device displays and alarms. Of 510 tests performed, the incidence of clinically important interference was 1.2%; EMI was Induced in 108 tests (21.2%). Interference occurred in 7 (44%) of the 16 devices tested. Cellular telephones can interfere with medical equipment. Technology changes in both cellular telephones and medical equipment may continue to mitigate or may worsen clinically relevant interference. Compared with cellular telephones tested in previous studies, those currently in use must be closer to medical devices before any interference is noticed. However, periodic testing of cellular telephones to determine their effects on medical equipment will be required.
11. "INSTRUMENTATION AND CONTROL SYSTEMS, EQUIPMENT LOCATION, TEST STAND TERMINAL ...
11. "INSTRUMENTATION AND CONTROL SYSTEMS, EQUIPMENT LOCATION, TEST STAND TERMINAL ROOM, PLANS AND SECTION." Specifications No. ENG-04-353-55-72; Drawing No. 60-0912; sheet 106 of 148; file no. 1321/57. Stamped: RECORD DRAWING - AS CONSTRUCTED. Below stamp: Contract no. 4338, no change. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Test Stand 1-A Terminal Room, Test Area 1-120, north end of Jupiter Boulevard, Boron, Kern County, CA
Complete Non-Radioactive Operability Tests for Cladding Hull Chlorination
DOE Office of Scientific and Technical Information (OSTI.GOV)
Collins, Emory D; Johnson, Jared A.; Hylton, Tom D.
2016-04-01
Non-radioactive operability tests were made to test the metal chlorination reactor and condenser and their accessories using batch chlorinations of non-radioactive cladding samples and to identify optimum operating practices and components that need further modifications prior to installation of the equipment into the hot cell for tests on actual used nuclear fuel (UNF) cladding. The operability tests included (1) modifications to provide the desired heating and reactor temperature profile; and (2) three batch chlorination tests using, respectively, 100, 250, and 500 g of cladding. During the batch chlorinations, metal corrosion of the equipment was assessed, pressurization of the gas inletmore » was examined and the best method for maintaining solid salt product transfer through the condenser was determined. Also, additional accessing equipment for collection of residual ash and positioning of the unit within the hot cell were identified, designed, and are being fabricated.« less
40 CFR Appendix B to Subpart S of... - Test Procedures
Code of Federal Regulations, 2010 CFR
2010-07-01
... percent or the vehicle's engine stalls at any time during the test sequence. (4) Multiple exhaust pipes. Exhaust gas concentrations from vehicle engines equipped with multiple exhaust pipes shall be sampled... pipes. Exhaust gas concentrations from vehicle engines equipped with multiple exhaust pipes shall be...
49 CFR Appendix A to Part 1511 - Aviation Security Infrastructure Fee
Code of Federal Regulations, 2011 CFR
2011-10-01
... final acceptance testing. This includes such equipment as Metal Detection Devices, Hand Wands, X-ray... such equipment as Metal Detection Devices, Hand Wands, X-ray screening machines, Explosives Trace... as test objects and X-ray radiation surveys, electricity costs and maintenance contract costs...
14 CFR 27.1435 - Hydraulic systems.
Code of Federal Regulations, 2012 CFR
2012-01-01
... in addition to hydraulic loads. (b) Tests. Each system must be substantiated by proof pressure tests... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Hydraulic systems. 27.1435 Section 27.1435... STANDARDS: NORMAL CATEGORY ROTORCRAFT Equipment Safety Equipment § 27.1435 Hydraulic systems. (a) Design...
14 CFR 27.1435 - Hydraulic systems.
Code of Federal Regulations, 2011 CFR
2011-01-01
... in addition to hydraulic loads. (b) Tests. Each system must be substantiated by proof pressure tests... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Hydraulic systems. 27.1435 Section 27.1435... STANDARDS: NORMAL CATEGORY ROTORCRAFT Equipment Safety Equipment § 27.1435 Hydraulic systems. (a) Design...
14 CFR 27.1435 - Hydraulic systems.
Code of Federal Regulations, 2010 CFR
2010-01-01
... in addition to hydraulic loads. (b) Tests. Each system must be substantiated by proof pressure tests... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Hydraulic systems. 27.1435 Section 27.1435... STANDARDS: NORMAL CATEGORY ROTORCRAFT Equipment Safety Equipment § 27.1435 Hydraulic systems. (a) Design...
14 CFR 27.1435 - Hydraulic systems.
Code of Federal Regulations, 2014 CFR
2014-01-01
... in addition to hydraulic loads. (b) Tests. Each system must be substantiated by proof pressure tests... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Hydraulic systems. 27.1435 Section 27.1435... STANDARDS: NORMAL CATEGORY ROTORCRAFT Equipment Safety Equipment § 27.1435 Hydraulic systems. (a) Design...
14 CFR 27.1435 - Hydraulic systems.
Code of Federal Regulations, 2013 CFR
2013-01-01
... in addition to hydraulic loads. (b) Tests. Each system must be substantiated by proof pressure tests... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Hydraulic systems. 27.1435 Section 27.1435... STANDARDS: NORMAL CATEGORY ROTORCRAFT Equipment Safety Equipment § 27.1435 Hydraulic systems. (a) Design...
46 CFR 160.054-5 - Inspections and tests.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 6 2013-10-01 2013-10-01 false Inspections and tests. 160.054-5 Section 160.054-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Kits, First-Aid, for Inflatable Liferafts § 160.054-5...
46 CFR 160.054-5 - Inspections and tests.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 6 2012-10-01 2012-10-01 false Inspections and tests. 160.054-5 Section 160.054-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Kits, First-Aid, for Inflatable Liferafts § 160.054-5...
46 CFR 160.054-5 - Inspections and tests.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 6 2014-10-01 2014-10-01 false Inspections and tests. 160.054-5 Section 160.054-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Kits, First-Aid, for Inflatable Liferafts § 160.054-5...
46 CFR 160.054-5 - Inspections and tests.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 6 2011-10-01 2011-10-01 false Inspections and tests. 160.054-5 Section 160.054-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Kits, First-Aid, for Inflatable Liferafts § 160.054-5...
Steam cycle of the FR2 (in German)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Perinic, D.; Schmidt, T.
1973-01-01
Following a brief explanation of the requirement of the experimental circuit, the use of irradiation and the circuit are described in detail. The installed experimental equipment within the test circuit is described and the safety problems discussed. The operation of the test equipment is summarized. (GE)
Preparations for a train-to-train impact test of crash-energy management passenger rail equipment
DOT National Transportation Integrated Search
2005-03-16
Preparations are ongoing for a full-scale train-to-train : impact test of crash-energy management (CEM) equipment, : during which a cab car-led passenger consist, initially moving : at 30 mph, will impact a standing locomotive-led consist. The : coll...
40 CFR 86.306-79 - Equipment required and specifications; overview.
Code of Federal Regulations, 2012 CFR
2012-07-01
...) AIR PROGRAMS (CONTINUED) CONTROL OF EMISSIONS FROM NEW AND IN-USE HIGHWAY VEHICLES AND ENGINES Emission Regulations for New Gasoline-Fueled and Diesel-Fueled Heavy-Duty Engines; Gaseous Exhaust Test... for both gasoline-fueled and Diesel engine gaseous emission tests. Generally, the equipment required...
40 CFR 86.306-79 - Equipment required and specifications; overview.
Code of Federal Regulations, 2013 CFR
2013-07-01
...) AIR PROGRAMS (CONTINUED) CONTROL OF EMISSIONS FROM NEW AND IN-USE HIGHWAY VEHICLES AND ENGINES Emission Regulations for New Gasoline-Fueled and Diesel-Fueled Heavy-Duty Engines; Gaseous Exhaust Test... for both gasoline-fueled and Diesel engine gaseous emission tests. Generally, the equipment required...
40 CFR 86.306-79 - Equipment required and specifications; overview.
Code of Federal Regulations, 2011 CFR
2011-07-01
...) AIR PROGRAMS (CONTINUED) CONTROL OF EMISSIONS FROM NEW AND IN-USE HIGHWAY VEHICLES AND ENGINES Emission Regulations for New Gasoline-Fueled and Diesel-Fueled Heavy-Duty Engines; Gaseous Exhaust Test... for both gasoline-fueled and Diesel engine gaseous emission tests. Generally, the equipment required...
40 CFR 86.306-79 - Equipment required and specifications; overview.
Code of Federal Regulations, 2010 CFR
2010-07-01
...) AIR PROGRAMS (CONTINUED) CONTROL OF EMISSIONS FROM NEW AND IN-USE HIGHWAY VEHICLES AND ENGINES Emission Regulations for New Gasoline-Fueled and Diesel-Fueled Heavy-Duty Engines; Gaseous Exhaust Test... for both gasoline-fueled and Diesel engine gaseous emission tests. Generally, the equipment required...
30 CFR 18.20 - Quality of material, workmanship, and design.
Code of Federal Regulations, 2011 CFR
2011-07-01
... TESTING, EVALUATION, AND APPROVAL OF MINING PRODUCTS ELECTRIC MOTOR-DRIVEN MINE EQUIPMENT AND ACCESSORIES... facilitate inspection and maintenance. (b) MSHA will test only electrical equipment that in the opinion of... shall be accessible for field inspection, where practicable. (e) An audible warning device shall be...
30 CFR 18.20 - Quality of material, workmanship, and design.
Code of Federal Regulations, 2010 CFR
2010-07-01
... TESTING, EVALUATION, AND APPROVAL OF MINING PRODUCTS ELECTRIC MOTOR-DRIVEN MINE EQUIPMENT AND ACCESSORIES... facilitate inspection and maintenance. (b) MSHA will test only electrical equipment that in the opinion of... shall be accessible for field inspection, where practicable. (e) An audible warning device shall be...
46 CFR 160.036-4 - Approval and production tests.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 6 2011-10-01 2011-10-01 false Approval and production tests. 160.036-4 Section 160.036-4 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Hand-Held Rocket-Propelled Parachute Red Flare...
46 CFR 160.036-4 - Approval and production tests.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 6 2013-10-01 2013-10-01 false Approval and production tests. 160.036-4 Section 160.036-4 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Hand-Held Rocket-Propelled Parachute Red Flare...
46 CFR 160.036-4 - Approval and production tests.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 6 2014-10-01 2014-10-01 false Approval and production tests. 160.036-4 Section 160.036-4 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Hand-Held Rocket-Propelled Parachute Red Flare...
46 CFR 160.036-4 - Approval and production tests.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 6 2012-10-01 2012-10-01 false Approval and production tests. 160.036-4 Section 160.036-4 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Hand-Held Rocket-Propelled Parachute Red Flare...
46 CFR 160.036-4 - Approval and production tests.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 6 2010-10-01 2010-10-01 false Approval and production tests. 160.036-4 Section 160.036-4 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Hand-Held Rocket-Propelled Parachute Red Flare...
46 CFR 160.054-5 - Inspections and tests.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 6 2010-10-01 2010-10-01 false Inspections and tests. 160.054-5 Section 160.054-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Kits, First-Aid, for Inflatable Liferafts § 160.054-5...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-02
... industrial equipment, which includes commercial refrigeration equipment, the focus of this notice.\\1\\ Part C... for commercial refrigeration equipment. (42 U.S.C. 6314(a)(6)(C)) On December 8, 2006, DOE published a final rule adopting test procedures for commercial refrigeration equipment. 71 FR 71340. Title 10 of the...
2007-12-14
KENNEDY SPACE CENTER, FLA. -- On Launch Pad 39A, a technician explains how test equipment -- the blue monitor -- will be used to validate the circuit on test wiring from the electrical harness in space shuttle Atlantis' aft main engine compartment connected with the engine cut-off system. The test wiring leads from the tail mast on the mobile launcher platform to the interior where the Time Domain Reflectometry, or TDR, test equipment will be located to test the sensor system. Photo credit: NASA/Kim Shiflett
22 CFR 129.7 - Prior approval (license).
Code of Federal Regulations, 2010 CFR
2010-04-01
...; (ii) Nuclear weapons strategic delivery systems and all components, parts, accessories, attachments specifically designed for such systems and associated equipment; (iii) Nuclear weapons design and test equipment of a nature described by Category XVI of Part 121; (iv) Naval nuclear propulsion equipment of a...
22 CFR 129.7 - Prior approval (license).
Code of Federal Regulations, 2011 CFR
2011-04-01
...; (ii) Nuclear weapons strategic delivery systems and all components, parts, accessories, attachments specifically designed for such systems and associated equipment; (iii) Nuclear weapons design and test equipment of a nature described by Category XVI of part 121; (iv) Naval nuclear propulsion equipment of a...
77 FR 72781 - Standards Improvement Project-Phase IV
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-06
... prepare and maintain written training-certification records for personal protective equipment, revised... revising the standards related to fit testing personal protective equipment, notably Sec. Sec. 1926.103 and... requirement to certify personal protective equipment (PPE) training. OSHA concluded that it could obtain the...
Space shuttle low cost/risk avionics study
NASA Technical Reports Server (NTRS)
1971-01-01
All work breakdown structure elements containing any avionics related effort were examined for pricing the life cycle costs. The analytical, testing, and integration efforts are included for the basic onboard avionics and electrical power systems. The design and procurement of special test equipment and maintenance and repair equipment are considered. Program management associated with these efforts is described. Flight test spares and labor and materials associated with the operations and maintenance of the avionics systems throughout the horizontal flight test are examined. It was determined that cost savings can be achieved by using existing hardware, maximizing orbiter-booster commonality, specifying new equipments to MIL quality standards, basing redundancy on cost effective analysis, minimizing software complexity and reducing cross strapping and computer-managed functions, utilizing compilers and floating point computers, and evolving the design as dictated by the horizontal flight test schedules.
Alternatives to ozone depleting refrigerants in test equipment
NASA Technical Reports Server (NTRS)
Hall, Richard L.; Johnson, Madeleine R.
1995-01-01
This paper describes the initial results of a refrigerant retrofit project at the Aerospace Guidance and Metrology Center (AGMC) at Newark Air Force Base, Ohio. The objective is to convert selected types of test equipment to properly operate on hydrofluorocarbon (HFC) alternative refrigerants, having no ozone depleting potential, without compromising system reliability or durability. This paper discusses the primary technical issues and summarizes the test results for 17 different types of test equipment: ten environmental chambers, two ultralow temperature freezers, two coolant recirculators, one temperature control unit, one vapor degreaser, and one refrigerant recovery system. The postconversion performance test results have been very encouraging: system capacity and input power remained virtually unchanged. In some cases, the minimum operating temperature increased by a few degrees as a result of the conversion, but never beyond AGMC's functional requirements.
Environmental testing for new SOFIA flight hardware
NASA Astrophysics Data System (ADS)
Lachenmann, Michael; Wolf, Jürgen; Strecker, Rainer; Weckenmann, Benedikt; Trimpe, Fritz; Hall, Helen J.
2014-07-01
New flight hardware for the Stratospheric Observatory for Infrared Astronomy (SOFIA) has to be tested to prove its safety and functionality and to measure its performance under flight conditions. Although it is not expected to experience critical issues inside the pressurized cabin with close-to-normal conditions, all equipment has to be tested for safety margins in case of a decompression event and/or for unusual high temperatures, e.g. inside an electronic unit caused by a malfunction as well as unusual high ambient temperatures inside the cabin, when the aircraft is parked in a desert. For equipment mounted on the cavity side of the telescope, stratospheric conditions apply, i.e., temperatures from -40 °C to -60°C and an air pressure of about 0.1 bar. Besides safety aspects as not to endanger personnel or equipment, new hardware inside the cavity has to function and to perform to specifications under such conditions. To perform these tests, an environmental test laboratory was set up at the SOFIA Science Center at the NASA Ames Research Center, including a thermal vacuum chamber, temperature measurement equipment, and a control and data logging workstation. This paper gives an overview of the test and measurement equipment, shows results from the commissioning and characterization of the thermal vacuum chamber, and presents examples of the component tests that were performed so far. To test the focus position stability of optics when cooling them to stratospheric temperatures, an auto-collimation device has been developed. We will present its design and results from measurements on commercial off-the-shelf optics as candidates for the new Wide Field Imager for SOFIA as an example.
NASA Astrophysics Data System (ADS)
Buică, G.; Beiu, C.; Antonov, A.; Dobra, R.; Păsculescu, D.
2017-06-01
The protecting electrical equipment in use are subject to various factors generated by the use, maintenance, storage and working environment, which may change the characteristics of protection against electric shock. The study presents the results of research on the behaviour over time of protective characteristics of insulating covers of material of work equipment in use, in order to determine the type and periodicity of safety tests. There were tested and evaluated safety equipment with plastic and insulating rubber covers used in operations of verifying functionality, safety and maintenance of machinery used in manufacturing industries and specific services from electric, energy and food sector.
2008-01-24
KENNEDY SPACE CENTER, FLA. -- In the hypergolic maintenance facility at NASA's Kennedy Space Center, technicians monitor equipment during testing of the Ares I-X Roll Control System, or RoCS. The RoCS Servicing Simulation Test is to gather data that will be used to help certify the ground support equipment design and validate the servicing requirements and processes. The RoCS is part of the Interstage structure, the lowest axial segment of the Upper Stage Simulator. In an effort to reduce costs and meet the schedule, most of the ground support equipment that will be used for the RoCS servicing is of space shuttle heritage. This high-fidelity servicing simulation will provide confidence that servicing requirements can be met with the heritage system. At the same time, the test will gather process data that will be used to modify or refine the equipment and processes to be used for the actual flight element. Photo credit: NASA/Kim Shiflett
2008-01-24
KENNEDY SPACE CENTER, FLA. -- In the hypergolic maintenance facility at NASA's Kennedy Space Center, technicians monitor equipment during testing of the Ares I-X Roll Control System, or RoCS. The RoCS Servicing Simulation Test is to gather data that will be used to help certify the ground support equipment design and validate the servicing requirements and processes. The RoCS is part of the Interstage structure, the lowest axial segment of the Upper Stage Simulator. In an effort to reduce costs and meet the schedule, most of the ground support equipment that will be used for the RoCS servicing is of space shuttle heritage. This high-fidelity servicing simulation will provide confidence that servicing requirements can be met with the heritage system. At the same time, the test will gather process data that will be used to modify or refine the equipment and processes to be used for the actual flight element. Photo credit: NASA/Kim Shiflett
2008-01-24
KENNEDY SPACE CENTER, FLA. -- In the hypergolic maintenance facility at NASA's Kennedy Space Center, a technician adjusts equipment during testing of the Ares I-X Roll Control System, or RoCS. The RoCS Servicing Simulation Test is to gather data that will be used to help certify the ground support equipment design and validate the servicing requirements and processes. The RoCS is part of the Interstage structure, the lowest axial segment of the Upper Stage Simulator. In an effort to reduce costs and meet the schedule, most of the ground support equipment that will be used for the RoCS servicing is of space shuttle heritage. This high-fidelity servicing simulation will provide confidence that servicing requirements can be met with the heritage system. At the same time, the test will gather process data that will be used to modify or refine the equipment and processes to be used for the actual flight element. Photo credit: NASA/Kim Shiflett
2008-01-24
KENNEDY SPACE CENTER, FLA. -- In the hypergolic maintenance facility at NASA's Kennedy Space Center, a technician (right) adjusts equipment during testing of the Ares I-X Roll Control System, or RoCS. The RoCS Servicing Simulation Test is to gather data that will be used to help certify the ground support equipment design and validate the servicing requirements and processes. The RoCS is part of the Interstage structure, the lowest axial segment of the Upper Stage Simulator. In an effort to reduce costs and meet the schedule, most of the ground support equipment that will be used for the RoCS servicing is of space shuttle heritage. This high-fidelity servicing simulation will provide confidence that servicing requirements can be met with the heritage system. At the same time, the test will gather process data that will be used to modify or refine the equipment and processes to be used for the actual flight element. Photo credit: NASA/Kim Shiflett
2008-01-24
KENNEDY SPACE CENTER, FLA. -- In the hypergolic maintenance facility at NASA's Kennedy Space Center, technicians monitor equipment during testing of the Ares I-X Roll Control System, or RoCS. The RoCS Servicing Simulation Test is to gather data that will be used to help certify the ground support equipment design and validate the servicing requirements and processes. The RoCS is part of the Interstage structure, the lowest axial segment of the Upper Stage Simulator. In an effort to reduce costs and meet the schedule, most of the ground support equipment that will be used for the RoCS servicing is of space shuttle heritage. This high-fidelity servicing simulation will provide confidence that servicing requirements can be met with the heritage system. At the same time, the test will gather process data that will be used to modify or refine the equipment and processes to be used for the actual flight element. Photo credit: NASA/Kim Shiflett
2008-01-24
KENNEDY SPACE CENTER, FLA. -- In the hypergolic maintenance facility at NASA's Kennedy Space Center, a technician monitors equipment during testing of the Ares I-X Roll Control System, or RoCS. The RoCS Servicing Simulation Test is to gather data that will be used to help certify the ground support equipment design and validate the servicing requirements and processes. The RoCS is part of the Interstage structure, the lowest axial segment of the Upper Stage Simulator. In an effort to reduce costs and meet the schedule, most of the ground support equipment that will be used for the RoCS servicing is of space shuttle heritage. This high-fidelity servicing simulation will provide confidence that servicing requirements can be met with the heritage system. At the same time, the test will gather process data that will be used to modify or refine the equipment and processes to be used for the actual flight element. Photo credit: NASA/Kim Shiflett
2008-01-24
KENNEDY SPACE CENTER, FLA. -- In the hypergolic maintenance facility at NASA's Kennedy Space Center, a technician adjusts equipment during testing of the Ares I-X Roll Control System, or RoCS. The RoCS Servicing Simulation Test is to gather data that will be used to help certify the ground support equipment design and validate the servicing requirements and processes. The RoCS is part of the Interstage structure, the lowest axial segment of the Upper Stage Simulator. In an effort to reduce costs and meet the schedule, most of the ground support equipment that will be used for the RoCS servicing is of space shuttle heritage. This high-fidelity servicing simulation will provide confidence that servicing requirements can be met with the heritage system. At the same time, the test will gather process data that will be used to modify or refine the equipment and processes to be used for the actual flight element. Photo credit: NASA/Kim Shiflett
The Design of Software for Three-Phase Induction Motor Test System
NASA Astrophysics Data System (ADS)
Haixiang, Xu; Fengqi, Wu; Jiai, Xue
2017-11-01
The design and development of control system software is important to three-phase induction motor test equipment, which needs to be completely familiar with the test process and the control procedure of test equipment. In this paper, the software is developed according to the national standard (GB/T1032-2005) about three-phase induction motor test method by VB language. The control system and data analysis software and the implement about motor test system are described individually, which has the advantages of high automation and high accuracy.
Annual Report Nucelar Energy Research and Development Program Nuclear Energy Research Initiative
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hively, LM
2003-02-13
NERI Project No.2000-0109 began in August 2000 and has three tasks. The first project year addressed Task 1, namely development of nonlinear prognostication for critical equipment in nuclear power facilities. That work is described in the first year's annual report (ORNLTM-2001/195). The current (second) project year (FY02) addresses Task 2, while the third project year will address Tasks 2-3. This report describes the work for the second project year, spanning August 2001 through August 2002, including status of the tasks, issues and concerns, cost performance, and status summary of tasks. The objective of the second project year's work is amore » compelling demonstration of the nonlinear prognostication algorithm using much more data. The guidance from Dr. Madeline Feltus (DOE/NE-20) is that it would be preferable to show forewarning of failure for different kinds of nuclear-grade equipment, as opposed to many different failure modes from one piece of equipment. Long-term monitoring of operational utility equipment is possible in principle, but is not practically feasible for the following reason. Time and funding constraints for this project do not allow us to monitor the many machines (thousands) that will be necessary to obtain even a few failure sequences, due to low failure rates (<10{sup -3}/year) in the operational environment. Moreover, the ONLY way to guarantee a controlled failure sequence is to seed progressively larger faults in the equipment or to overload the equipment for accelerated tests. Both of these approaches are infeasible for operational utility machinery, but are straight-forward in a test environment. Our subcontractor has provided such test sequences. Thus, we have revised Tasks 2.1-2.4 to analyze archival test data from such tests. The second phase of our work involves validation of the nonlinear prognostication over the second and third years of the proposed work. Recognizing the inherent limitations outlined in the previous paragraph, Dr. Feltus urged Oak Ridge National Laboratory (ORNL) to contact other researchers for additional data from other test equipment. Consequently, we have revised the work plan for Tasks 2.1-2.2, with corresponding changes to the work plan as shown in the Status Summary of NERI Tasks. The revised tasks are as follows: Task 2.1--ORNL will obtain test data from a subcontractor and other researchers for various test equipment. This task includes development of a test plan or a description of the historical testing, as appropriate: test facility, equipment to be tested, choice of failure mode(s), testing protocol, data acquisition equipment, and resulting data from the test sequence. ORNL will analyze this data for quality, and subsequently via the nonlinear paradigm for prognostication. Task 2.2--ORNL will evaluate the prognostication capability of the nonlinear paradigm. The comparison metrics for reliability of the predictions will include the true positives, true negatives, and the forewarning times. Task 2.3--ORNL will improve the nonlinear paradigm as appropriate, in accord with the results of Tasks 2.1-2.2, to maximize the rate of true positive and true negative indications of failure. Maximal forewarning time is also highly desirable. Task 2.4--ORNL will develop advanced algorithms for the phase-space distribution function (PS-DF) pattern change recognition, based on the results of Task 2.3. This implementation will provide a capability for automated prognostication, as part of the maintenance decision-making. Appendix A provides a detailed description of the analysis methods, which include conventional statistics, traditional nonlinear measures, and ORNL's patented nonlinear PSDM. The body of this report focuses on results of this analysis.« less
21 CFR 820.72 - Inspection, measuring, and test equipment.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Inspection, measuring, and test equipment. 820.72 Section 820.72 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL DEVICES QUALITY SYSTEM REGULATION Production and Process Controls § 820.72 Inspection...
46 CFR 160.053-4 - Inspections and tests.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 6 2011-10-01 2011-10-01 false Inspections and tests. 160.053-4 Section 160.053-4 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Work Vests, Unicellular Plastic Foam § 160.053-4 Inspections and...
46 CFR 160.049-5 - Inspections and tests. 1
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 6 2011-10-01 2011-10-01 false Inspections and tests. 1 160.049-5 Section 160.049-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Specification for a Buoyant Cushion Plastic Foam § 160.049-5...
46 CFR 160.053-4 - Inspections and tests.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 6 2010-10-01 2010-10-01 false Inspections and tests. 160.053-4 Section 160.053-4 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Work Vests, Unicellular Plastic Foam § 160.053-4 Inspections and...
46 CFR 160.049-5 - Inspections and tests. 1
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 6 2010-10-01 2010-10-01 false Inspections and tests. 1 160.049-5 Section 160.049-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Specification for a Buoyant Cushion Plastic Foam § 160.049-5...
46 CFR 169.247 - Firefighting equipment.
Code of Federal Regulations, 2011 CFR
2011-10-01
... certification and periodic inspection and at such other times as considered necessary all fire-extinguishing... condition of the equipment. The inspector verifies that the tests and inspections required in Tables 169.247.... Table 169.247(a)(1)—Portable Extinguishers Type unit Test Foam Discharge. Clean hose and inside of...
46 CFR 169.247 - Firefighting equipment.
Code of Federal Regulations, 2010 CFR
2010-10-01
... certification and periodic inspection and at such other times as considered necessary all fire-extinguishing... condition of the equipment. The inspector verifies that the tests and inspections required in Tables 169.247.... Table 169.247(a)(1)—Portable Extinguishers Type unit Test Foam Discharge. Clean hose and inside of...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-10
... DEPARTMENT OF HOMELAND SECURITY Coast Guard 46 CFR Parts 160, 180, and 199 [Docket No. USCG-2010-0048] RIN 1625-AB46 Lifesaving Equipment: Production Testing and Harmonization With International Standards Correction In rule document 2011-25035, appearing on pages 62962-63015 in the issue of Monday...
40 CFR 1068.415 - How do I test my engines/equipment?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 32 2010-07-01 2010-07-01 false How do I test my engines/equipment? 1068.415 Section 1068.415 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR POLLUTION CONTROLS GENERAL COMPLIANCE PROVISIONS FOR ENGINE PROGRAMS Selective Enforcement Auditing § 1068...
This document is the Environmental Technology Verification (ETV) Technology Specific Test Plan (TSTP) for evaluation of drinking water treatment equipment utilizing adsorptive media for synthetic organic chemical (SOC) removal. This TSTP is to be used within the structure provid...
DOT National Transportation Integrated Search
1998-07-01
This report is one element of a cooperative agreement between NHTSA and UMTRI entitled Intelligent Cruise Control (ICC) Field Operational Test (FOT). It addresses the operation of a serial string or dense cluster of passenger cars equipped with a new...
7 CFR 800.186 - Standards of conduct.
Code of Federal Regulations, 2010 CFR
2010-01-01
... equipment testing service unless licensed or authorized to do so; (2) Engage in criminal, dishonest, or... the integrity of the inspection, weighing, or equipment testing services performed under the Act; (3) Except as provided in § 800.76(a), engage in any outside (unofficial) work or activity that: (i) May...
46 CFR 160.041-5 - Inspections and tests.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 6 2010-10-01 2010-10-01 false Inspections and tests. 160.041-5 Section 160.041-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Kits, First-Aid, for Merchant Vessels § 160.041-5 Inspections...
2017-02-06
and methodology for transitioning craft acceleration data to laboratory shock test requirements are summarized and example requirements for...engineering rationale, assumptions, and methodology for transitioning craft acceleration data to laboratory shock test requirements are summarized and... Methodologies for Small High-Speed Craft Structure, Equipment, Shock Isolation Seats, and Human Performance At-Sea, 10 th Symposium on High
Acceptance test procedure for the L-070 project mechanical equipment and instrumentation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Loll, C.M.
1996-04-19
This document contains the acceptance test procedure for the mechanical equipment and instrumentation installed per the L-070 Project. The specific system to be tested are the pump controls for the 3906 Lift Station and 350-A Lift Station. In addition, verification that signals are being received by the 300 Area Treated Effluent Disposal Facility control system, is also performed.
75 FR 21777 - Regulatory Agenda
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-26
... flexibility analyses: Energy Efficiency Standards for Pool Heaters and Direct Heating Equipment and Water... Heaters and Direct Heating Equipment and Water 1904-AA90 Heaters 119 Test Procedures for Walk-In Coolers... Renewable Energy (EE) 118. ENERGY EFFICIENCY STANDARDS FOR POOL HEATERS AND DIRECT HEATING EQUIPMENT AND...
Department of Energy Semiannual Regulatory Agenda
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-26
...: Energy Efficiency Standards for Pool Heaters and Direct Heating Equipment and Water Heaters, and Test... EFFICIENCY STANDARDS FOR POOL HEATERS AND DIRECT HEATING EQUIPMENT AND WATER HEATERS Legal Authority: 42 USC... and direct heating equipment. This is the second review for water heaters. Timetable: Action Date FR...
30 CFR 36.21 - Engine for equipment considered for certification.
Code of Federal Regulations, 2013 CFR
2013-07-01
... considered for certification. Only equipment powered by a compression-ignition (diesel) engine and burning... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Engine for equipment considered for... TESTING, EVALUATION, AND APPROVAL OF MINING PRODUCTS APPROVAL REQUIREMENTS FOR PERMISSIBLE MOBILE DIESEL...
30 CFR 36.21 - Engine for equipment considered for certification.
Code of Federal Regulations, 2011 CFR
2011-07-01
... considered for certification. Only equipment powered by a compression-ignition (diesel) engine and burning... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Engine for equipment considered for... TESTING, EVALUATION, AND APPROVAL OF MINING PRODUCTS APPROVAL REQUIREMENTS FOR PERMISSIBLE MOBILE DIESEL...
30 CFR 36.21 - Engine for equipment considered for certification.
Code of Federal Regulations, 2012 CFR
2012-07-01
... considered for certification. Only equipment powered by a compression-ignition (diesel) engine and burning... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Engine for equipment considered for... TESTING, EVALUATION, AND APPROVAL OF MINING PRODUCTS APPROVAL REQUIREMENTS FOR PERMISSIBLE MOBILE DIESEL...
30 CFR 36.21 - Engine for equipment considered for certification.
Code of Federal Regulations, 2014 CFR
2014-07-01
... considered for certification. Only equipment powered by a compression-ignition (diesel) engine and burning... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Engine for equipment considered for... TESTING, EVALUATION, AND APPROVAL OF MINING PRODUCTS APPROVAL REQUIREMENTS FOR PERMISSIBLE MOBILE DIESEL...
30 CFR 36.21 - Engine for equipment considered for certification.
Code of Federal Regulations, 2010 CFR
2010-07-01
... considered for certification. Only equipment powered by a compression-ignition (diesel) engine and burning... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Engine for equipment considered for... TESTING, EVALUATION, AND APPROVAL OF MINING PRODUCTS APPROVAL REQUIREMENTS FOR PERMISSIBLE MOBILE DIESEL...
33 CFR 106.255 - Security systems and equipment maintenance.
Code of Federal Regulations, 2010 CFR
2010-07-01
... maintained according to manufacturers' recommendations. (b) Security systems must be regularly tested in... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Security systems and equipment... Shelf (OCS) Facility Security Requirements § 106.255 Security systems and equipment maintenance. (a...
Test Telemetry And Command System (TTACS)
NASA Technical Reports Server (NTRS)
Fogel, Alvin J.
1994-01-01
The Jet Propulsion Laboratory has developed a multimission Test Telemetry and Command System (TTACS) which provides a multimission telemetry and command data system in a spacecraft test environment. TTACS reuses, in the spacecraft test environment, components of the same data system used for flight operations; no new software is developed for the spacecraft test environment. Additionally, the TTACS is transportable to any spacecraft test site, including the launch site. The TTACS is currently operational in the Galileo spacecraft testbed; it is also being provided to support the Cassini and Mars Surveyor Program projects. Minimal personnel data system training is required in the transition from pre-launch spacecraft test to post-launch flight operations since test personnel are already familiar with the data system's operation. Additionally, data system components, e.g. data display, can be reused to support spacecraft software development; and the same data system components will again be reused during the spacecraft integration and system test phases. TTACS usage also results in early availability of spacecraft data to data system development and, as a result, early data system development feedback to spacecraft system developers. The TTACS consists of a multimission spacecraft support equipment interface and components of the multimission telemetry and command software adapted for a specific project. The TTACS interfaces to the spacecraft, e.g., Command Data System (CDS), support equipment. The TTACS telemetry interface to the CDS support equipment performs serial (RS-422)-to-ethernet conversion at rates between 1 bps and 1 mbps, telemetry data blocking and header generation, guaranteed data transmission to the telemetry data system, and graphical downlink routing summary and control. The TTACS command interface to the CDS support equipment is nominally a command file transferred in non-real-time via ethernet. The CDS support equipment is responsible for metering the commands to the CDS; additionally for Galileo, TTACS includes a real-time-interface to the CDS support equipment. The TTACS provides the basic functionality of the multimission telemetry and command data system used during flight operations. TTACS telemetry capabilities include frame synchronization, Reed-Solomon decoding, packet extraction and channelization, and data storage/query. Multimission data display capabilities are also available. TTACS command capabilities include command generation verification, and storage.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Buddemeier, Brooke R.; Wood-Zika, Annmarie R.; Haynes, Daniel
The overall objective of this project is to research, evaluate, and test first responder preventive radiological/nuclear detection (PRND) equipment to provide state and local agencies with scientific guidance on how to effectively use this equipment for response after a radiological/nuclear release or detonation. While the equipment being tested in this effort has been specifically designed by technology manufacturers and purchased by responders for preventive detection and source interdiction operations, the fleet of PRND equipment can help fill critical needs for radiological instrumentation should a consequence management (CM) response take place, as it is currently the most widely available and fieldedmore » radiological instrumentation by state and local agencies. This effort will provide scientific guidance on the most effective way to utilize this class of equipment for consequence management missions. Gaining a better understanding of how PRND equipment can operate and perform for these missions will allow for recommendations on the tactical approach responders can use for consequence management operations. PRND equipment has been placed into service by federal, state, and local agencies throughout the nation. If the equipment capability and limitations are taken into account, this large inventory can be leveraged to support the emergency response in the aftermath of a radiological or nuclear event. With several hundred makes and models of PRND equipment, often with significantly different detection capabilities that do not align with their nominal PRND equipment type, development of a streamlined categorization scheme with respect to consequence management missions was the first step to identifying safe and effective uses of PRND equipment for radiological/nuclear incident response.« less
A cost-analysis of two approaches to infection control in a lung function laboratory.
Side, E A; Harrington, G; Thien, F; Walters, E H; Johns, D P
1999-02-01
The Thoracic Society of Australia and New Zealand (TSANZ) guidelines for infection control in respiratory laboratories are based on a 'Universal Precautions' approach to patient care. This requires that one-way breathing valves, flow sensors, and other items, be cleaned and disinfected between patient use. However, this is impractical in a busy laboratory. The recent introduction of disposable barrier filters may provide a practical solution to this problem, although most consider this approach to be an expensive option. To compare the cost of implementing the TSANZ infection control guidelines with the cost of using disposable barrier filters. Costs were based on the standard tests and equipment currently used in the lung function laboratory at The Alfred Hospital. We have assumed that a barrier filter offers the same degree of protection against cross-infection between patients as the TSANZ infection control guidelines. Time and motion studies were performed on the dismantling, cleaning, disinfecting, reassembling and re-calibrating of equipment. Conservative estimates were made as to the frequency of replacing pneumotachographs and rubber mouthpieces based on previous equipment turnover. Labour costs for a scientist to reprocess the equipment was based on $20.86/hour. The cost of employing a casual cleaner at an hourly rate of $14.07 to assist in reprocessing equipment was also investigated. The new high efficiency HyperFilter disposable barrier filter, costing $2.95 was used in this cost-analysis. The cost of reprocessing equipment required for spirometry alone was $17.58 per test if a scientist reprocesses the equipment, and $15.56 per test if a casual cleaner is employed to assist the scientist in performing these duties. In contrast, using a disposable filter would cost only $2.95 per test. Using a filter was considerably less expensive than following the TSANZ guidelines for all tests and equipment used in this cost-analysis. The TSANZ infection control guidelines are expensive and impractical to implement. However, disposable barrier filters provide a practical and inexpensive method of infection control.
US quality control in Italy: present and future
NASA Astrophysics Data System (ADS)
Balbis, S.; Musacchio, C.; Guiot, C.; Spagnolo, R.
2011-02-01
US diagnostic equipments are widely diffused in Italy but, in spite of recommendations (e.g. ISPESL-Ministry of Health (1999) and SIRM (Società Italiana di Radiologia Medica, 2004), US quality controls are restricted to only a few public sanitary structure and a national (or even regional) quality assurance program for testing the performances of the US equipments is still missing. A joint Research Centre among the three Piedmontese Universities and INRIM, partially funded by Regione Piemonte, has been established in 2009 as Reference Centre for Medical Ultrasounds (CRUM). In addition to research, development and training tasks, the Centre aims at the local diffusion of the quality assurance in clinical US equipments. According to data from the Ministry of Health (2006), around 7 % of the Italian US diagnostic equipments (946 over 13526) are located in Piedmont: mostly (75.6%) in public hospitals, 9.3 % in conventionated hospitals, 4.3% in public and 10.8% in private territorial structures. The goal is the provision of a regional database, which progressively includes data related to acceptance test, status and QC tests and maintenance, in order to drive equipment turnover and carefully monitoring the overall equipment efficiency. Moreover, facilities are available at CRUM for monitoring both beam geometry and acoustic power and performing quantitative assessment of the delivered energy intensity.
Mammalian Toxicology Testing: Problem Definition Study, Global Army Toxicology Requirements.
1981-03-01
Electronic Warfare Equipment (D251) Tactical ECK System (64750A) Protective Electronic Warfare Equipment (D540) High Energy Electromagnetic Radiation...Fighting Portable Weapon (for IFV) Smoke Grenade Launcher Staff Smart, Target-Activated Fire-and-Forget Tactical ECK System (63755A) Protective Electronic...Warfare Equipment (D251) Tactical ECK System (64750A) Protective Electronic Warfare Equipment (D540) High Energy Electromagnetic Radiation Weapons (e.g
Preventive Rad/Nuc Detection Equipment Categorization for Consequence Management
DOE Office of Scientific and Technical Information (OSTI.GOV)
Buddemeier, B. R.; Musolino, S. V.; Klemic, G.
The overall objective of this project is to research, evaluate, and test first responder preventive radiological/nuclear detection equipment (PRND) to provide state and local agencies with guidance on how to best use this equipment for response after a radiological/nuclear release or detonation. While the equipment being tested in this effort has been specifically designed for detection and interdiction operations, the fleet of PRND equipment can help fill critical needs for radiological instrumentation should a consequence management response take place. This effort will provide scientific guidance on the best way to deploy and operate this class of equipment for consequence managementmore » missions. With the support of the US Department of Homeland Security’s (DHS) Domestic Nuclear Detection Office (DNDO), PRND equipment has been placed into service at federal, state, and local agencies throughout the nation. If the equipment capability and limitations are taken into account, this large inventory can be repurposed to support the emergency response in the aftermath of a radiological of nuclear event. This report evaluates PRND equipment to define key categories of equipment and the types of missions they can be used for. This is important because there are over 100 different types of PRND equipment, often with significantly different capabilities with respect to the consequence management mission. The current DNDO draft NIMS PRND equipment types were used as a foundation and expanded, when necessary, to address key characteristics important for the consequence mission. Table 1 provides a summary of the PRND instrument categories developed for this effort. Also included on the table are some common response mission detection equipment categories that will be used for capability comparisons.« less
46 CFR 109.223 - Fire fighting equipment.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Fire fighting equipment. 109.223 Section 109.223 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS OPERATIONS Tests, Drills, and Inspections § 109.223 Fire fighting equipment. The master or person in charge...
46 CFR 109.223 - Fire fighting equipment.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Fire fighting equipment. 109.223 Section 109.223 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS OPERATIONS Tests, Drills, and Inspections § 109.223 Fire fighting equipment. The master or person in charge...
46 CFR 109.223 - Fire fighting equipment.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Fire fighting equipment. 109.223 Section 109.223 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS OPERATIONS Tests, Drills, and Inspections § 109.223 Fire fighting equipment. The master or person in charge...
46 CFR 109.223 - Fire fighting equipment.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Fire fighting equipment. 109.223 Section 109.223 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS OPERATIONS Tests, Drills, and Inspections § 109.223 Fire fighting equipment. The master or person in charge...
46 CFR 109.223 - Fire fighting equipment.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Fire fighting equipment. 109.223 Section 109.223 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS OPERATIONS Tests, Drills, and Inspections § 109.223 Fire fighting equipment. The master or person in charge...
7 CFR 3300.70 - Issuance of certificate.
Code of Federal Regulations, 2014 CFR
2014-01-01
... BE USED FOR SUCH CARRIAGE (ATP); INSPECTION, TESTING, AND CERTIFICATION OF SPECIAL EQUIPMENT Certification of New Equipment § 3300.70 Issuance of certificate. The ATP manager will evaluate the documents received and, for equipment deemed qualified, will issue a U.S. ATP certificate to the applicant within 30...
7 CFR 3300.70 - Issuance of certificate.
Code of Federal Regulations, 2010 CFR
2010-01-01
... BE USED FOR SUCH CARRIAGE (ATP); INSPECTION, TESTING, AND CERTIFICATION OF SPECIAL EQUIPMENT Certification of New Equipment § 3300.70 Issuance of certificate. The ATP manager will evaluate the documents received and, for equipment deemed qualified, will issue a U.S. ATP certificate to the applicant within 30...
7 CFR 3300.82 - Issuance of certificate.
Code of Federal Regulations, 2012 CFR
2012-01-01
... BE USED FOR SUCH CARRIAGE (ATP); INSPECTION, TESTING, AND CERTIFICATION OF SPECIAL EQUIPMENT Certification of Equipment in Service § 3300.82 Issuance of certificate. The ATP manager will evaluate documents received and, for equipment deemed qualified, will issue a U.S. ATP certificate to the applicant within 30...
7 CFR 3300.70 - Issuance of certificate.
Code of Federal Regulations, 2013 CFR
2013-01-01
... BE USED FOR SUCH CARRIAGE (ATP); INSPECTION, TESTING, AND CERTIFICATION OF SPECIAL EQUIPMENT Certification of New Equipment § 3300.70 Issuance of certificate. The ATP manager will evaluate the documents received and, for equipment deemed qualified, will issue a U.S. ATP certificate to the applicant within 30...
7 CFR 3300.82 - Issuance of certificate.
Code of Federal Regulations, 2013 CFR
2013-01-01
... BE USED FOR SUCH CARRIAGE (ATP); INSPECTION, TESTING, AND CERTIFICATION OF SPECIAL EQUIPMENT Certification of Equipment in Service § 3300.82 Issuance of certificate. The ATP manager will evaluate documents received and, for equipment deemed qualified, will issue a U.S. ATP certificate to the applicant within 30...
7 CFR 3300.82 - Issuance of certificate.
Code of Federal Regulations, 2011 CFR
2011-01-01
... BE USED FOR SUCH CARRIAGE (ATP); INSPECTION, TESTING, AND CERTIFICATION OF SPECIAL EQUIPMENT Certification of Equipment in Service § 3300.82 Issuance of certificate. The ATP manager will evaluate documents received and, for equipment deemed qualified, will issue a U.S. ATP certificate to the applicant within 30...
7 CFR 3300.82 - Issuance of certificate.
Code of Federal Regulations, 2014 CFR
2014-01-01
... BE USED FOR SUCH CARRIAGE (ATP); INSPECTION, TESTING, AND CERTIFICATION OF SPECIAL EQUIPMENT Certification of Equipment in Service § 3300.82 Issuance of certificate. The ATP manager will evaluate documents received and, for equipment deemed qualified, will issue a U.S. ATP certificate to the applicant within 30...
7 CFR 3300.70 - Issuance of certificate.
Code of Federal Regulations, 2011 CFR
2011-01-01
... BE USED FOR SUCH CARRIAGE (ATP); INSPECTION, TESTING, AND CERTIFICATION OF SPECIAL EQUIPMENT Certification of New Equipment § 3300.70 Issuance of certificate. The ATP manager will evaluate the documents received and, for equipment deemed qualified, will issue a U.S. ATP certificate to the applicant within 30...