Sample records for testing facility management

  1. 40 CFR 792.31 - Testing facility management.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 31 2010-07-01 2010-07-01 true Testing facility management. 792.31... facility management. For each study, testing facility management shall: (a) Designate a study director as... appropriately tested for identity, strength, purity, stability, and uniformity, as applicable. (e) Assure that...

  2. 40 CFR 160.31 - Testing facility management.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 23 2010-07-01 2010-07-01 false Testing facility management. 160.31... GOOD LABORATORY PRACTICE STANDARDS Organization and Personnel § 160.31 Testing facility management. For each study, testing facility management shall: (a) Designate a study director as described in § 160.33...

  3. 21 CFR 58.31 - Testing facility management.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 1 2010-04-01 2010-04-01 false Testing facility management. 58.31 Section 58.31... management. For each nonclinical laboratory study, testing facility management shall: (a) Designate a study... appropriately tested for identity, strength, purity, stability, and uniformity, as applicable. (e) Assure that...

  4. 21 CFR 58.31 - Testing facility management.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL GOOD LABORATORY PRACTICE FOR NONCLINICAL LABORATORY STUDIES Organization and Personnel § 58.31 Testing facility management. For each nonclinical laboratory study, testing facility management shall: (a) Designate a study...

  5. Vehicle Thermal Management Facilities | Transportation Research | NREL

    Science.gov Websites

    Management Facilities Vehicle Thermal Management Facilities Image of a building with two semi truck evaluation facilities to develop advanced thermal management technologies for vehicles. Vehicle Testing and apparatus. Combined fluid loops bench research apparatus in the Vehicle Thermal Management Laboratory. Photo

  6. Progress towards implementation of ACT malaria case-management in public health facilities in the Republic of Sudan: a cluster-sample survey

    PubMed Central

    2012-01-01

    Background Effective malaria case-management based on artemisinin-based combination therapy (ACT) and parasitological diagnosis is a major pillar within the 2007-2012 National Malaria Strategic Plan in the Sudan. Three years after the launch of the strategy a health facility survey was undertaken to evaluate case-management practices and readiness of the health facilities and health workers to implement a new malaria case-management strategy. Methods A cross-sectional, cluster sample survey was undertaken at public health facilities in 15 states of Sudan. Data were collected using quality-of-care assessment methods. The main outcomes were the proportions of facilities with ACTs and malaria diagnostics; proportions of health workers exposed to malaria related health systems support activities; and composite and individual indicators of case-management practices for febrile outpatients stratified by age, availability of ACTs and diagnostics, use of malaria diagnostics, and test result. Results We evaluated 244 facilities, 294 health workers and 1,643 consultations for febrile outpatients (425 < 5 years and 1,218 ≥ 5 years). Health facility and health worker readiness was variable: chloroquine was available at only 5% of facilities, 73% stocked recommended artesunate and sulfadoxine/pyrimethamine (AS+SP), 51% had the capacity to perform parasitological diagnosis, 53% of health workers had received in-service training on ACTs, 24% were trained in the use of malaria Rapid Diagnostic Tests, and 19% had received a supervisory visit including malaria case-management. At all health facilities 46% of febrile patients were parasitologically tested and 35% of patients were both, tested and treated according to test result. At facilities where AS+SP and malaria diagnostics were available 66% of febrile patients were tested and 51% were both, tested and treated according to test result. Among test positive patients 64% were treated with AS+SP but 24% were treated with artemether monotherapy. Among test negative patients only 17% of patients were treated for malaria. The majority of ACT dispensing and counseling practices were suboptimal. Conclusions Five years following change of the policy from chloroquine to ACTs and 3 years before the end of the new malaria strategic plan chloroquine was successfully phased out from public facilities in Sudan, however, an important gap remained in the availability of ACTs, diagnostic capacities and coverage with malaria case-management activities. The national scale-up of diagnostics, using the findings of this survey as well as future qualitative research, should present an opportunity not only to expand existing testing capacities but also to implement effective support interventions to bridge the health systems gaps and support corrective case-management measures, including the discontinuation of artemether monotherapy treatment. PMID:22221821

  7. An environmental testing facility for Space Station Freedom power management and distribution hardware

    NASA Technical Reports Server (NTRS)

    Jackola, Arthur S.; Hartjen, Gary L.

    1992-01-01

    The plans for a new test facility, including new environmental test systems, which are presently under construction, and the major environmental Test Support Equipment (TSE) used therein are addressed. This all-new Rocketdyne facility will perform space simulation environmental tests on Power Management and Distribution (PMAD) hardware to Space Station Freedom (SSF) at the Engineering Model, Qualification Model, and Flight Model levels of fidelity. Testing will include Random Vibration in three axes - Thermal Vacuum, Thermal Cycling and Thermal Burn-in - as well as numerous electrical functional tests. The facility is designed to support a relatively high throughput of hardware under test, while maintaining the high standards required for a man-rated space program.

  8. The use of an automated flight test management system in the development of a rapid-prototyping flight research facility

    NASA Technical Reports Server (NTRS)

    Duke, Eugene L.; Hewett, Marle D.; Brumbaugh, Randal W.; Tartt, David M.; Antoniewicz, Robert F.; Agarwal, Arvind K.

    1988-01-01

    An automated flight test management system (ATMS) and its use to develop a rapid-prototyping flight research facility for artificial intelligence (AI) based flight systems concepts are described. The ATMS provides a flight test engineer with a set of tools that assist in flight planning and simulation. This system will be capable of controlling an aircraft during the flight test by performing closed-loop guidance functions, range management, and maneuver-quality monitoring. The rapid-prototyping flight research facility is being developed at the Dryden Flight Research Facility of the NASA Ames Research Center (Ames-Dryden) to provide early flight assessment of emerging AI technology. The facility is being developed as one element of the aircraft automation program which focuses on the qualification and validation of embedded real-time AI-based systems.

  9. Evaluating malaria case management at public health facilities in two provinces in Angola.

    PubMed

    Plucinski, Mateusz M; Ferreira, Manzambi; Ferreira, Carolina Miguel; Burns, Jordan; Gaparayi, Patrick; João, Lubaki; da Costa, Olinda; Gill, Parambir; Samutondo, Claudete; Quivinja, Joltim; Mbounga, Eliane; de León, Gabriel Ponce; Halsey, Eric S; Dimbu, Pedro Rafael; Fortes, Filomeno

    2017-05-03

    Malaria accounts for the largest portion of healthcare demand in Angola. A pillar of malaria control in Angola is the appropriate management of malaria illness, including testing of suspect cases with rapid diagnostic tests (RDTs) and treatment of confirmed cases with artemisinin-based combination therapy (ACT). Periodic systematic evaluations of malaria case management are recommended to measure health facility readiness and adherence to national case management guidelines. Cross-sectional health facility surveys were performed in low-transmission Huambo and high-transmission Uíge Provinces in early 2016. In each province, 45 health facilities were randomly selected from among all public health facilities stratified by level of care. Survey teams performed inventories of malaria commodities and conducted exit interviews and re-examinations, including RDT testing, of a random selection of all patients completing outpatient consultations. Key health facility readiness and case management indicators were calculated adjusting for the cluster sampling design and utilization. Availability of RDTs or microscopy on the day of the survey was 71% (54-83) in Huambo and 85% (67-94) in Uíge. At least one unit dose pack of one formulation of an ACT (usually artemether-lumefantrine) was available in 83% (66-92) of health facilities in Huambo and 79% (61-90) of health facilities in Uíge. Testing rates of suspect malaria cases in Huambo were 30% (23-38) versus 69% (53-81) in Uíge. Overall, 28% (13-49) of patients with uncomplicated malaria, as determined during the re-examination, were appropriately treated with an ACT with the correct dose in Huambo, compared to 60% (42-75) in Uíge. Incorrect case management of suspect malaria cases was associated with lack of healthcare worker training in Huambo and ACT stock-outs in Uíge. The results reveal important differences between provinces. Despite similar availability of testing and ACT, testing and treatment rates were lower in Huambo compared to Uíge. A majority of true malaria cases seeking care in health facilities in Huambo were not appropriately treated with anti-malarials, highlighting the importance of continued training and supervision of healthcare workers in malaria case management, particularly in areas with decreased malaria transmission.

  10. Energy Systems Test Area (ESTA) Pyrotechnic Operations: User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    Hacker, Scott

    2012-01-01

    The Johnson Space Center (JSC) has created and refined innovative analysis, design, development, and testing techniques that have been demonstrated in all phases of spaceflight. JSC is uniquely positioned to apply this expertise to components, systems, and vehicles that operate in remote or harsh environments. We offer a highly skilled workforce, unique facilities, flexible project management, and a proven management system. The purpose of this guide is to acquaint Test Requesters with the requirements for test, analysis, or simulation services at JSC. The guide includes facility services and capabilities, inputs required by the facility, major milestones, a roadmap of the facility s process, and roles and responsibilities of the facility and the requester. Samples of deliverables, facility interfaces, and inputs necessary to define the cost and schedule are included as appendices to the guide.

  11. Magnetohydrodynamics (MHD) Engineering Test Facility (ETF) 200 MWe power plant Conceptual Design Engineering Report (CDER)

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The reference conceptual design of the magnetohydrodynamic (MHD) Engineering Test Facility (ETF), a prototype 200 MWe coal-fired electric generating plant designed to demonstrate the commercial feasibility of open cycle MHD, is summarized. Main elements of the design, systems, and plant facilities are illustrated. System design descriptions are included for closed cycle cooling water, industrial gas systems, fuel oil, boiler flue gas, coal management, seed management, slag management, plant industrial waste, fire service water, oxidant supply, MHD power ventilating

  12. Magnetohydrodynamics (MHD) Engineering Test Facility (ETF) 200 MWe power plant Conceptual Design Engineering Report (CDER)

    NASA Astrophysics Data System (ADS)

    1981-09-01

    The reference conceptual design of the magnetohydrodynamic (MHD) Engineering Test Facility (ETF), a prototype 200 MWe coal-fired electric generating plant designed to demonstrate the commercial feasibility of open cycle MHD, is summarized. Main elements of the design, systems, and plant facilities are illustrated. System design descriptions are included for closed cycle cooling water, industrial gas systems, fuel oil, boiler flue gas, coal management, seed management, slag management, plant industrial waste, fire service water, oxidant supply, MHD power ventilating

  13. The development of an automated flight test management system for flight test planning and monitoring

    NASA Technical Reports Server (NTRS)

    Hewett, Marle D.; Tartt, David M.; Duke, Eugene L.; Antoniewicz, Robert F.; Brumbaugh, Randal W.

    1988-01-01

    The development of an automated flight test management system (ATMS) as a component of a rapid-prototyping flight research facility for AI-based flight systems concepts is described. The rapid-prototyping facility includes real-time high-fidelity simulators, numeric and symbolic processors, and high-performance research aircraft modified to accept commands for a ground-based remotely augmented vehicle facility. The flight system configuration of the ATMS includes three computers: the TI explorer LX and two GOULD SEL 32/27s.

  14. Methods and Systems for Advanced Spaceport Information Management

    NASA Technical Reports Server (NTRS)

    Fussell, Ronald M. (Inventor); Ely, Donald W. (Inventor); Meier, Gary M. (Inventor); Halpin, Paul C. (Inventor); Meade, Phillip T. (Inventor); Jacobson, Craig A. (Inventor); Blackwell-Thompson, Charlie (Inventor)

    2007-01-01

    Advanced spaceport information management methods and systems are disclosed. In one embodiment, a method includes coupling a test system to the payload and transmitting one or more test signals that emulate an anticipated condition from the test system to the payload. One or more responsive signals are received from the payload into the test system and are analyzed to determine whether one or more of the responsive signals comprises an anomalous signal. At least one of the steps of transmitting, receiving, analyzing and determining includes transmitting at least one of the test signals and the responsive signals via a communications link from a payload processing facility to a remotely located facility. In one particular embodiment, the communications link is an Internet link from a payload processing facility to a remotely located facility (e.g. a launch facility, university, etc.).

  15. Methods and systems for advanced spaceport information management

    NASA Technical Reports Server (NTRS)

    Ely, Donald W. (Inventor); Fussell, Ronald M. (Inventor); Halpin, Paul C. (Inventor); Blackwell-Thompson, Charlie (Inventor); Meier, Gary M. (Inventor); Meade, Phillip T. (Inventor); Jacobson, Craig A. (Inventor)

    2007-01-01

    Advanced spaceport information management methods and systems are disclosed. In one embodiment, a method includes coupling a test system to the payload and transmitting one or more test signals that emulate an anticipated condition from the test system to the payload. One or more responsive signals are received from the payload into the test system and are analyzed to determine whether one or more of the responsive signals comprises an anomalous signal. At least one of the steps of transmitting, receiving, analyzing and determining includes transmitting at least one of the test signals and the responsive signals via a communications link from a payload processing facility to a remotely located facility. In one particular embodiment, the communications link is an Internet link from a payload processing facility to a remotely located facility (e.g. a launch facility, university, etc.).

  16. Evaluating Past and Future USCG Use of Ohmsett Test Facility

    DTIC Science & Technology

    2016-10-01

    and Renewable Energy Test Facility, that was previously known as a fully capitalized acronym, Ohmsett. This facility is located on the U.S. Naval...Oil Spill Response Research and Renewable Energy Test Facility, that was previously known as a fully capitalized acronym, Ohmsett. This facility is...Incident Management Systems NSF National Strike Force NWS Naval Weapons Station Ohmsett National Oil Spill Response Research and Renewable Energy

  17. Management and Capability ot the Major Range and Test Facility Bases

    DTIC Science & Technology

    1995-07-27

    The audit objective was to evaluate management oversight provided to the test ranges and determine whether management oversight could be streamlined... The audit also evaluated whether program managers were procuring test resources that already existed at the test ranges. Management controls related to the objectives were also evaluated.

  18. Operation CASTLE. Report of the Manager Santa Fe Operations. Extracted Version.

    DTIC Science & Technology

    Nuclear explosion testing, *Test facilities, *Management planning and control, Pacific Ocean, Eniwetok Atoll, Bikini Atoll, Marshall Islands , Organizations, Construction, Operation, Management, Logistics support, Costs

  19. NASA Lewis Wind Tunnel Model Systems Criteria

    NASA Technical Reports Server (NTRS)

    Soeder, Ronald H.; Haller, Henry C.

    1994-01-01

    This report describes criteria for the design, analysis, quality assurance, and documentation of models or test articles that are to be tested in the aeropropulsion facilities at the NASA Lewis Research Center. The report presents three methods for computing model allowable stresses on the basis of the yield stress or ultimate stress, and it gives quality assurance criteria for models tested in Lewis' aeropropulsion facilities. Both customer-furnished model systems and in-house model systems are discussed. The functions of the facility manager, project engineer, operations engineer, research engineer, and facility electrical engineer are defined. The format for pretest meetings, prerun safety meetings, and the model criteria review are outlined Then, the format for the model systems report (a requirement for each model that is to be tested at NASA Lewis) is described, the engineers that are responsible for developing the model systems report are listed, and the time table for its delivery to the facility manager is given.

  20. Journey to the Nevada Test Site Radioactive Waste Management Complex

    ScienceCinema

    None

    2018-01-16

    Journey to the Nevada Test Site Radioactive Waste Management Complex begins with a global to regional perspective regarding the location of low-level and mixed low-level waste disposal at the Nevada Test Site. For decades, the Nevada National Security Site (NNSS) has served as a vital disposal resource in the nation-wide cleanup of former nuclear research and testing facilities. State-of-the-art waste management sites at the NNSS offer a safe, permanent disposal option for U.S. Department of Energy/U.S. Department of Defense facilities generating cleanup-related radioactive waste.

  1. Automated flight test management system

    NASA Technical Reports Server (NTRS)

    Hewett, M. D.; Tartt, D. M.; Agarwal, A.

    1991-01-01

    The Phase 1 development of an automated flight test management system (ATMS) as a component of a rapid prototyping flight research facility for artificial intelligence (AI) based flight concepts is discussed. The ATMS provides a flight engineer with a set of tools that assist in flight test planning, monitoring, and simulation. The system is also capable of controlling an aircraft during flight test by performing closed loop guidance functions, range management, and maneuver-quality monitoring. The ATMS is being used as a prototypical system to develop a flight research facility for AI based flight systems concepts at NASA Ames Dryden.

  2. Waste Receiving and Processing (WRAP) Facility PMS Test Report For Data Management System (DMS) Security Test DMS-Y2K

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    PALMER, M.E.

    1999-09-21

    Test Plan HNF-4351 defines testing requirements for installation of a new server in the WRAP Facility. This document shows the results of the test reports on the DMS-Y2K and DMS-F81 (Security) systems.

  3. Software Manages Documentation in a Large Test Facility

    NASA Technical Reports Server (NTRS)

    Gurneck, Joseph M.

    2001-01-01

    The 3MCS computer program assists and instrumentation engineer in performing the 3 essential functions of design, documentation, and configuration management of measurement and control systems in a large test facility. Services provided by 3MCS are acceptance of input from multiple engineers and technicians working at multiple locations;standardization of drawings;automated cross-referencing; identification of errors;listing of components and resources; downloading of test settings; and provision of information to customers.

  4. Registered nurses' medication management of the elderly in aged care facilities.

    PubMed

    Lim, L M; Chiu, L H; Dohrmann, J; Tan, K-L

    2010-03-01

    Data on adverse drug reactions (ADRs) showed a rising trend in the elderly over 65 years using multiple medications. To identify registered nurses' (RNs) knowledge of medication management and ADRs in the elderly in aged care facilities; evaluate an education programme to increase pharmacology knowledge and prevent ADRs in the elderly; and develop a learning programme with a view to extending provision, if successful. This exploratory study used a non-randomized pre- and post-test one group quasi-experimental design without comparators. It comprised a 23-item knowledge-based test questionnaire, one-hour teaching session and a self-directed learning package. The volunteer sample was RNs from residential aged care facilities, involved in medication management. Participants sat a pre-test immediately before the education, and post-test 4 weeks later (same questionnaire). Participants' perceptions obtained. Pre-test sample n = 58, post-test n = 40, attrition rate of 31%. Using Microsoft Excel 2000, descriptive statistical data analysis of overall pre- and post-test incorrect responses showed: pre-test proportion of incorrect responses = 0.40; post-test proportion of incorrect responses = 0.27; Z-test comparing pre- and post-tests scores of incorrect responses = 6.55 and one-sided P-value = 2.8E-11 (P < 0.001). Pre-test showed knowledge deficits in medication management and ADRs in the elderly; post-test showed statistically significant improvement in RNs' knowledge. It highlighted a need for continuing professional education. Further studies are required on a larger sample of RNs in other aged care facilities, and on the clinical impact of education by investigating nursing practice and elderly residents' outcomes.

  5. Cryogenic testing of Planck sorption cooler test facility

    NASA Technical Reports Server (NTRS)

    Zhang, B.; Pearson, D.; Borders, J.; Franklin, B.; Prina, M.; Hardy, J.; Crumb, D.

    2004-01-01

    A test facility has been upgraded in preparation for testing of two hydrogen sorption cryocoolers operating at 18/20 K. these sorption coolers are currently under development at the Jet Propulsion Laboratory. This work summarizes the scope of the test facility upgrade, including design for cryogenic cooling power delivery, system thermal management, insulation schemes, and data acquisition techniques. Ground support equipment for the sorption coolers, structural features of the test chamber, and the vacuum system involved for system testing will also be described in detail.

  6. Design and utilization of a Flight Test Engineering Database Management System at the NASA Dryden Flight Research Facility

    NASA Technical Reports Server (NTRS)

    Knighton, Donna L.

    1992-01-01

    A Flight Test Engineering Database Management System (FTE DBMS) was designed and implemented at the NASA Dryden Flight Research Facility. The X-29 Forward Swept Wing Advanced Technology Demonstrator flight research program was chosen for the initial system development and implementation. The FTE DBMS greatly assisted in planning and 'mass production' card preparation for an accelerated X-29 research program. Improved Test Plan tracking and maneuver management for a high flight-rate program were proven, and flight rates of up to three flights per day, two times per week were maintained.

  7. Description of the PMAD systems test bed facility and data system

    NASA Technical Reports Server (NTRS)

    Trase, Larry; Fong, Don; Adkins, Vicki; Birchenough, Arthur

    1992-01-01

    The power management and distribution (PMAD) systems test bed facility, including the power sources and loads available, is discussed, and the PMAD data system (PDS) is described. The PDS controls the test-bed facility hardware, and monitors and records the electric power system control data bus and external data. The PDS architecture is discussed, and each of the subsystems is described.

  8. Integrated water management system - Description and test results. [for Space Station waste water processing

    NASA Technical Reports Server (NTRS)

    Elden, N. C.; Winkler, H. E.; Price, D. F.; Reysa, R. P.

    1983-01-01

    Water recovery subsystems are being tested at the NASA Lyndon B. Johnson Space Center for Space Station use to process waste water generated from urine and wash water collection facilities. These subsystems are being integrated into a water management system that will incorporate wash water and urine processing through the use of hyperfiltration and vapor compression distillation subsystems. Other hardware in the water management system includes a whole body shower, a clothes washing facility, a urine collection and pretreatment unit, a recovered water post-treatment system, and a water quality monitor. This paper describes the integrated test configuration, pertinent performance data, and feasibility and design compatibility conclusions of the integrated water management system.

  9. Heavy-Duty Vehicle Thermal Management | Transportation Research | NREL

    Science.gov Websites

    Heavy-Duty Vehicle Thermal Management Heavy-Duty Vehicle Thermal Management Infrared image of a and meet more stringent idling regulations. NREL's HDV thermal management program, CoolCab, focuses on thermal management technologies undergo assessment at NREL's Vehicle Testing and Integration Facility test

  10. Using Executive Information Systems to Manage Capital Projects and Facilities.

    ERIC Educational Resources Information Center

    Kaynor, Robert

    1993-01-01

    In higher education, facilities data are essential for long-term capital and financial planning and for testing assumptions underlying anticipated policy change. Executive information systems should incorporate life-cycle considerations (planning, construction, renovation, and management) and resource linkages (describing interrelationships of…

  11. National remote computational flight research facility

    NASA Technical Reports Server (NTRS)

    Rediess, Herman A.

    1989-01-01

    The extension of the NASA Ames-Dryden remotely augmented vehicle (RAV) facility to accommodate flight testing of a hypersonic aircraft utilizing the continental United States as a test range is investigated. The development and demonstration of an automated flight test management system (ATMS) that uses expert system technology for flight test planning, scheduling, and execution is documented.

  12. 46 CFR 162.050-15 - Designation of facilities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    .... (2) Each type of equipment the facility proposes to test. (3) A description of the facility's... concentrations and the values obtained by the facility with their equipment. The value of X d for the 12... conduct approval tests— (1) A facility must have the management organization, equipment for conducting...

  13. Wind Tunnel and Propulsion Test Facilities: An Assessment of NASA's Capabilities to Serve National Needs

    NASA Technical Reports Server (NTRS)

    Anton, Philip S.; Gritton, Eugene C.; Mesic, Richard; Steinberg, Paul; Johnson, Dana J.

    2004-01-01

    This monograph reveals and discusses the National Aeronautics and Space Administration's (NASA's) wind tunnel and propulsion test facility management issues that are creating real risks to the United States' competitive aeronautics advantage.

  14. Mechanical Components Branch Test Facilities and Capabilities

    NASA Technical Reports Server (NTRS)

    Oswald, Fred B.

    2004-01-01

    The Mechanical Components Branch at NASA Glenn Research Center formulates, conducts, and manages research focused on propulsion systems for both present and advanced aeronautical and space vehicles. The branch is comprised of research teams that perform basic research in three areas: mechanical drives, aerospace seals, and space mechanisms. Each team has unique facilities for testing aerospace hardware and concepts. This report presents an overview of the Mechanical Components Branch test facilities.

  15. Space Shuttle wind tunnel testing program

    NASA Technical Reports Server (NTRS)

    Whitnah, A. M.; Hillje, E. R.

    1984-01-01

    A major phase of the Space Shuttle Vehicle (SSV) Development Program was the acquisition of data through the space shuttle wind tunnel testing program. It became obvious that the large number of configuration/environment combinations would necessitate an extremely large wind tunnel testing program. To make the most efficient use of available test facilities and to assist the prime contractor for orbiter design and space shuttle vehicle integration, a unique management plan was devised for the design and development phase. The space shuttle program is reviewed together with the evolutional development of the shuttle configuration. The wind tunnel testing rationale and the associated test program management plan and its overall results is reviewed. Information is given for the various facilities and models used within this program. A unique posttest documentation procedure and a summary of the types of test per disciplines, per facility, and per model are presented with detailed listing of the posttest documentation.

  16. Nevada National Security Site Environmental Report 2016

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wills

    This Nevada National Security Site Environmental Report (NNSSER) was prepared to satisfy DOE Order DOE O 231.1B, “Environment, Safety and Health Reporting.” Its purpose is to (1) report compliance status with environmental standards and requirements, (2) present results of environmental monitoring of radiological and nonradiological effluents, (3) report estimated radiological doses to the public from releases of radioactive material, (4) summarize environmental incidents of noncompliance and actions taken in response to them, (5) describe the National Nuclear Security Administration Nevada Field Office (NNSA/NFO) Environmental Management System and characterize its performance, and (6) highlight significant environmental programs and efforts. This NNSSERmore » summarizes data and compliance status for calendar year 2016 at the Nevada National Security Site (NNSS) and its two Nevada-based support facilities, the North Las Vegas Facility (NLVF) and the Remote Sensing Laboratory–Nellis (RSL-Nellis). It also addresses environmental restoration (ER) projects conducted at the Tonopah Test Range (TTR) and the Nevada Test and Training Range (NTTR). NNSA/NFO directs the management and operation of the NNSS and six sites across the nation. In addition to the NNSA itself, the six sites include two in Nevada (NLVF and RSL-Nellis) and four in other states (RSL-Andrews in Maryland, Livermore Operations in California, Los Alamos Operations in New Mexico, and Special Technologies Laboratory in California). Los Alamos, Lawrence Livermore, and Sandia National Laboratories are the principal organizations that sponsor and implement the nuclear weapons programs at the NNSS. National Security Technologies, LLC (NSTec), is the current Management and Operating contractor accountable for the successful execution of work and ensuring that work is performed in compliance with environmental regulations. The six sites all provide support to enhance the NNSS as a location for its multiple missions. The three major NNSS missions include National Security/Defense, Environmental Management, and Nondefense. The major programs that support these missions are Stockpile Stewardship and Management, Nonproliferation and Counterterrorism, Nuclear Emergency Response, Strategic Partnership Projects, Environmental Restoration, Waste Management, Conservation and Renewable Energy, Other Research and Development, and Infrastructure. The major facilities that support the programs include the U1a Facility, Big Explosives Experimental Facility (BEEF), Device Assembly Facility, Dense Plasma Focus Facility, Joint Actinide Shock Physics Experimental Research Facility, Radiological/Nuclear Countermeasures Test and Evaluation Complex, Nonproliferation Test and Evaluation Complex (NPTEC), Radiological/Nuclear Weapons of Mass Destruction Incident Exercise Site, the Area 5 Radioactive Waste Management Complex (RWMC), and the Area 3 Radioactive Waste Management Site (RWMS).« less

  17. 30 CFR 254.42 - Exercises for your response personnel and equipment.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE... facility or at a corporate location designated in the plan. Records showing that OSRO's and oil spill...) An annual spill management team tabletop exercise. The exercise must test the spill management team's...

  18. 30 CFR 254.42 - Exercises for your response personnel and equipment.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., DEPARTMENT OF THE INTERIOR OFFSHORE OIL-SPILL RESPONSE REQUIREMENTS FOR FACILITIES LOCATED SEAWARD OF THE... facility or at a corporate location designated in the plan. Records showing that OSRO's and oil spill...) An annual spill management team tabletop exercise. The exercise must test the spill management team's...

  19. Facility or Facilities? That is the Question.

    NASA Astrophysics Data System (ADS)

    Viso, M.

    2018-04-01

    The management of the martian samples upon arrival on the Earth will require a lot of work to ensure a safe life detection and biohazard testing during the quarantine. This will induce a sharing of the load between several facilities.

  20. Postirradiation Testing Laboratory (327 Building)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kammenzind, D.E.

    A Standards/Requirements Identification Document (S/RID) is the total list of the Environment, Safety and Health (ES and H) requirements to be implemented by a site, facility, or activity. These requirements are appropriate to the life cycle phase to achieve an adequate level of protection for worker and public health and safety, and the environment during design, construction, operation, decontamination and decommissioning, and environmental restoration. S/RlDs are living documents, to be revised appropriately based on change in the site`s or facility`s mission or configuration, a change in the facility`s life cycle phase, or a change to the applicable standards/requirements. S/RIDs encompassmore » health and safety, environmental, and safety related safeguards and security (S and S) standards/requirements related to the functional areas listed in the US Department of Energy (DOE) Environment, Safety and Health Configuration Guide. The Fluor Daniel Hanford (FDH) Contract S/RID contains standards/requirements, applicable to FDH and FDH subcontractors, necessary for safe operation of Project Hanford Management Contract (PHMC) facilities, that are not the direct responsibility of the facility manager (e.g., a site-wide fire department). Facility S/RIDs contain standards/requirements applicable to a specific facility that are the direct responsibility of the facility manager. S/RlDs are prepared by those responsible for managing the operation of facilities or the conduct of activities that present a potential threat to the health and safety of workers, public, or the environment, including: Hazard Category 1 and 2 nuclear facilities and activities, as defined in DOE 5480.23. Selected Hazard Category 3 nuclear, and Low Hazard non-nuclear facilities and activities, as agreed upon by RL. The Postirradiation Testing Laboratory (PTL) S/RID contains standards/ requirements that are necessary for safe operation of the PTL facility, and other building/areas that are the direct responsibility of the specific facility manager. The specific DOE Orders, regulations, industry codes/standards, guidance documents and good industry practices that serve as the basis for each element/subelement are identified and aligned with each subelement.« less

  1. Space Station Environmental Control and Life Support System Test Facility at Marshall Space Flight Center

    NASA Technical Reports Server (NTRS)

    Springer, Darlene

    1989-01-01

    Different aspects of Space Station Environmental Control and Life Support System (ECLSS) testing are currently taking place at Marshall Space Flight Center (MSFC). Unique to this testing is the variety of test areas and the fact that all are located in one building. The north high bay of building 4755, the Core Module Integration Facility (CMIF), contains the following test areas: the Subsystem Test Area, the Comparative Test Area, the Process Material Management System (PMMS), the Core Module Simulator (CMS), the End-use Equipment Facility (EEF), and the Pre-development Operational System Test (POST) Area. This paper addresses the facility that supports these test areas and briefly describes the testing in each area. Future plans for the building and Space Station module configurations will also be discussed.

  2. Development of a test facility to evaluate the optimal design of BMPs for managing environmental problems at construction sites.

    DOT National Transportation Integrated Search

    2012-06-01

    The following document is the final report for ALDOT Project 930655 which summarizes the design and : construction of the Auburn University Erosion and Sediment Control Testing Facility (AUESCTF) along : with several intermediatescale, f...

  3. Senator Doug Jones (D-AL) Tour of MSFC Facilities

    NASA Image and Video Library

    2018-02-22

    Senator Doug Jones (D-AL.) and wife, Louise, tour Marshall Space Flight facilities. Steve Doering, manager, Stages Element, Space Launch System (SLS) program at MSFC, views the test stand 4693 where key SLS structural elements will be subjected to stress testing simulating space flight.

  4. Predictive Analytics to Support Real-Time Management in Pathology Facilities.

    PubMed

    Lessard, Lysanne; Michalowski, Wojtek; Chen Li, Wei; Amyot, Daniel; Halwani, Fawaz; Banerjee, Diponkar

    2016-01-01

    Predictive analytics can provide valuable support to the effective management of pathology facilities. The introduction of new tests and technologies in anatomical pathology will increase the volume of specimens to be processed, as well as the complexity of pathology processes. In order for predictive analytics to address managerial challenges associated with the volume and complexity increases, it is important to pinpoint the areas where pathology managers would most benefit from predictive capabilities. We illustrate common issues in managing pathology facilities with an analysis of the surgical specimen process at the Department of Pathology and Laboratory Medicine (DPLM) at The Ottawa Hospital, which processes all surgical specimens for the Eastern Ontario Regional Laboratory Association. We then show how predictive analytics could be used to support management. Our proposed approach can be generalized beyond the DPLM, contributing to a more effective management of pathology facilities and in turn to quicker clinical diagnoses.

  5. Predictive Analytics to Support Real-Time Management in Pathology Facilities

    PubMed Central

    Lessard, Lysanne; Michalowski, Wojtek; Chen Li, Wei; Amyot, Daniel; Halwani, Fawaz; Banerjee, Diponkar

    2016-01-01

    Predictive analytics can provide valuable support to the effective management of pathology facilities. The introduction of new tests and technologies in anatomical pathology will increase the volume of specimens to be processed, as well as the complexity of pathology processes. In order for predictive analytics to address managerial challenges associated with the volume and complexity increases, it is important to pinpoint the areas where pathology managers would most benefit from predictive capabilities. We illustrate common issues in managing pathology facilities with an analysis of the surgical specimen process at the Department of Pathology and Laboratory Medicine (DPLM) at The Ottawa Hospital, which processes all surgical specimens for the Eastern Ontario Regional Laboratory Association. We then show how predictive analytics could be used to support management. Our proposed approach can be generalized beyond the DPLM, contributing to a more effective management of pathology facilities and in turn to quicker clinical diagnoses. PMID:28269873

  6. Aeronautical Facilities Catalogue. Volume 1: Wind Tunnels

    NASA Technical Reports Server (NTRS)

    Penaranda, F. E. (Compiler); Freda, M. S. (Compiler)

    1985-01-01

    Domestic and foreign wind tunnel facilities are enumerated and their technical parameters are described. Data pertinent to managers and engineers are presented. Facilities judged comparable in testing capability are noted and grouped together. Several comprehensive cross-indexes and charts are included.

  7. Exploring Space Management Goals in Institutional Care Facilities in China

    PubMed Central

    Zhang, Jiankun

    2017-01-01

    Space management has been widely examined in commercial facilities, educational facilities, and hospitals but not in China's institutional care facilities. Poor spatial arrangements, such as wasted space, dysfunctionality, and environment mismanagement, are increasing; in turn, the occupancy rate is decreasing due to residential dissatisfaction. To address these problems, this paper's objective is to explore the space management goals (SMGs) in institutional care facilities in China. Systematic literature analysis was adopted to set SMGs' principles, to identify nine theoretical SMGs, and to develop the conceptual model of SMGs for institutional care facilities. A total of 19 intensive interviews were conducted with stakeholders in seven institutional care facilities to collect data for qualitative analysis. The qualitative evidence was analyzed through open coding, axial coding, and selective coding. As a result, six major categories as well as their interrelationships were put forward to visualize the path diagram for exploring SMGs in China's institutional care facilities. Furthermore, seven expected SMGs that were explored from qualitative evidence were confirmed as China's SMGs in institutional care facilities by a validation test. Finally, a gap analysis among theoretical SMGs and China's SMGs provided recommendations for implementing space management in China's institutional care facilities. PMID:29065629

  8. Exploring Space Management Goals in Institutional Care Facilities in China.

    PubMed

    Li, Lingzhi; Yuan, Jingfeng; Ning, Yan; Shao, Qiuhu; Zhang, Jiankun

    2017-01-01

    Space management has been widely examined in commercial facilities, educational facilities, and hospitals but not in China's institutional care facilities. Poor spatial arrangements, such as wasted space, dysfunctionality, and environment mismanagement, are increasing; in turn, the occupancy rate is decreasing due to residential dissatisfaction. To address these problems, this paper's objective is to explore the space management goals (SMGs) in institutional care facilities in China. Systematic literature analysis was adopted to set SMGs' principles, to identify nine theoretical SMGs, and to develop the conceptual model of SMGs for institutional care facilities. A total of 19 intensive interviews were conducted with stakeholders in seven institutional care facilities to collect data for qualitative analysis. The qualitative evidence was analyzed through open coding, axial coding, and selective coding. As a result, six major categories as well as their interrelationships were put forward to visualize the path diagram for exploring SMGs in China's institutional care facilities. Furthermore, seven expected SMGs that were explored from qualitative evidence were confirmed as China's SMGs in institutional care facilities by a validation test. Finally, a gap analysis among theoretical SMGs and China's SMGs provided recommendations for implementing space management in China's institutional care facilities.

  9. Shifting the burden or expanding access to care? Assessing malaria trends following scale-up of community health worker malaria case management and reactive case detection.

    PubMed

    Larsen, David A; Winters, Anna; Cheelo, Sanford; Hamainza, Busiku; Kamuliwo, Mulakwa; Miller, John M; Bridges, Daniel J

    2017-11-02

    Malaria is a significant burden to health systems and is responsible for a large proportion of outpatient cases at health facilities in endemic regions. The scale-up of community management of malaria and reactive case detection likely affect both malaria cases and outpatient attendance at health facilities. Using health management information data from 2012 to 2013 this article examines health trends before and after the training of volunteer community health workers to test and treat malaria cases in Southern Province, Zambia. An estimated 50% increase in monthly reported malaria infections was found when community health workers were involved with malaria testing and treating in the community (incidence rate ratio 1.52, p < 0.001). Furthermore, an estimated 6% decrease in outpatient attendance at the health facility was found when community health workers were involved with malaria testing and treating in the community. These results suggest a large public health benefit to both community case management of malaria and reactive case detection. First, the capacity of the malaria surveillance system to identify malaria infections was increased by nearly one-third. Second, the outpatient attendance at health facilities was modestly decreased. Expanding the capacity of the malaria surveillance programme through systems such as community case management and reactive case detection is an important step toward malaria elimination.

  10. LPT. Shield test facility (TAN646). Sections and details of water ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    LPT. Shield test facility (TAN-646). Sections and details of water management areas. Ralph M. Parsons 1229-17 ANP/GE-6-646-P-3. April 1957. Approved by INEEL Classification Office for public release. INEEL index code no. 037-0646-51-693-107388 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID

  11. Western Aeronautical Test Range

    NASA Technical Reports Server (NTRS)

    Sakahara, Robert D.

    2008-01-01

    This viewgraph presentation reviews the work of the Western Aeronautical Test Range (WATR). NASA's Western Aeronautical Test Range is a network of facilities used to support aeronautical research, science missions, exploration system concepts, and space operations. The WATR resides at NASA's Dryden Flight Research Center located at Edwards Air Force Base, California. The WATR is a part of NASA's Corporate Management of Aeronautical Facilities and funded by the Strategic Capability Asset Program (SCAP). Maps show the general location of the WATR area that is used for aeronautical testing and evaluation. The products, services and facilities of WATR are discussed,

  12. The infrared spectrograph during the SIRTF pre-definition phase

    NASA Technical Reports Server (NTRS)

    Houck, James R.

    1988-01-01

    A test facility was set up to evaluate back-illuminated impurity band detectors constructed for an infrared spectrograph to be used on the Space Infrared Telescope Facility (SIRTF). Equipment built to perform the tests on these arrays is described. Initial tests have been geared toward determining dark current and read noise for the array. Four prior progress reports are incorporated into this report. They describe the first efforts in the detector development and testing effort; testing details and a new spectrograph concept; a discussion of resolution issues raised by the new design; management activities; a review of computer software and testing facility hardware; and a review of the preamplifier constructed as well as a revised schematic of the detector evaluation facility.

  13. Application of GPS and Near-Surface Geophysical Methods to Evaluate Agricultural Test Plot Differences

    USDA-ARS?s Scientific Manuscript database

    A field research facility with two pairs of replicated agricultural test plots (four total) was established at a location in northwest Ohio during 2005 for the purpose of studying water table management strategies. Initial efforts at this field research facility were devoted to evaluating difference...

  14. Using Facility Condition Assessments to Identify Actions Related to Infrastructure

    NASA Technical Reports Server (NTRS)

    Rubert, Kennedy F.

    2010-01-01

    To support cost effective, quality research it is essential that laboratory and testing facilities are maintained in a continuous and reliable state of availability at all times. NASA Langley Research Center (LaRC) and its maintenance contractor, Jacobs Technology, Inc. Research Operations, Maintenance, and Engineering (ROME) group, are in the process of implementing a combined Facility Condition Assessment (FCA) and Reliability Centered Maintenance (RCM) program to improve asset management and overall reliability of testing equipment in facilities such as wind tunnels. Specific areas are being identified for improvement, the deferred maintenance cost is being estimated, and priority is being assigned against facilities where conditions have been allowed to deteriorate. This assessment serves to assist in determining where to commit available funds on the Center. RCM methodologies are being reviewed and enhanced to assure that appropriate preventive, predictive, and facilities/equipment acceptance techniques are incorporated to prolong lifecycle availability and assure reliability at minimum cost. The results from the program have been favorable, better enabling LaRC to manage assets prudently.

  15. Technology requirements to be addressed by the NASA Lewis Research Center Cryogenic Fluid Management Facility program

    NASA Technical Reports Server (NTRS)

    Aydelott, J. C.; Rudland, R. S.

    1985-01-01

    The NASA Lewis Research Center is responsible for the planning and execution of a scientific program which will provide advance in space cryogenic fluid management technology. A number of future space missions were identified that require or could benefit from this technology. These fluid management technology needs were prioritized and a shuttle attached reuseable test bed, the cryogenic fluid management facility (CFMF), is being designed to provide the experimental data necessary for the technology development effort.

  16. Urban Rail Supporting Technology Program Fiscal Year 1974 Year End Summary

    DOT National Transportation Integrated Search

    1975-03-01

    Major areas include program management, technical support and application engineering, facilities development, test and evaluation, and technology development. Specific technical discussion includes track measurement systems; UMTA facilities developm...

  17. Optically-based Sensor System for Critical Nuclear Facilities Post-Event Seismic Structural Assessment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McCallen, David; Petrone, Floriana; Buckle, Ian

    The U.S. Department of Energy (DOE) has ownership and operational responsibility for a large enterprise of nuclear facilities that provide essential functions to DOE missions ranging from national security to discovery science and energy research. These facilities support a number of DOE programs and offices including the National Nuclear Security Administration, Office of Science, and Office of Environmental Management. With many unique and “one of a kind” functions, these facilities represent a tremendous national investment, and assuring their safety and integrity is fundamental to the success of a breadth of DOE programs. Many DOE critical facilities are located in regionsmore » with significant natural phenomenon hazards including major earthquakes and DOE has been a leader in developing standards for the seismic analysis of nuclear facilities. Attaining and sustaining excellence in nuclear facility design and management must be a core competency of the DOE. An important part of nuclear facility management is the ability to monitor facilities and rapidly assess the response and integrity of the facilities after any major upset event. Experience in the western U.S. has shown that understanding facility integrity after a major earthquake is a significant challenge which, lacking key data, can require extensive effort and significant time. In the work described in the attached report, a transformational approach to earthquake monitoring of facilities is described and demonstrated. An entirely new type of optically-based sensor that can directly and accurately measure the earthquake-induced deformations of a critical facility has been developed and tested. This report summarizes large-scale shake table testing of the sensor concept on a representative steel frame building structure, and provides quantitative data on the accuracy of the sensor measurements.« less

  18. Advanced Test Reactor Safety Basis Upgrade Lessons Learned Relative to Design Basis Verification and Safety Basis Management

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    G. L. Sharp; R. T. McCracken

    The Advanced Test Reactor (ATR) is a pressurized light-water reactor with a design thermal power of 250 MW. The principal function of the ATR is to provide a high neutron flux for testing reactor fuels and other materials. The reactor also provides other irradiation services such as radioisotope production. The ATR and its support facilities are located at the Test Reactor Area of the Idaho National Engineering and Environmental Laboratory (INEEL). An audit conducted by the Department of Energy's Office of Independent Oversight and Performance Assurance (DOE OA) raised concerns that design conditions at the ATR were not adequately analyzedmore » in the safety analysis and that legacy design basis management practices had the potential to further impact safe operation of the facility.1 The concerns identified by the audit team, and issues raised during additional reviews performed by ATR safety analysts, were evaluated through the unreviewed safety question process resulting in shutdown of the ATR for more than three months while these concerns were resolved. Past management of the ATR safety basis, relative to facility design basis management and change control, led to concerns that discrepancies in the safety basis may have developed. Although not required by DOE orders or regulations, not performing design basis verification in conjunction with development of the 10 CFR 830 Subpart B upgraded safety basis allowed these potential weaknesses to be carried forward. Configuration management and a clear definition of the existing facility design basis have a direct relation to developing and maintaining a high quality safety basis which properly identifies and mitigates all hazards and postulated accident conditions. These relations and the impact of past safety basis management practices have been reviewed in order to identify lessons learned from the safety basis upgrade process and appropriate actions to resolve possible concerns with respect to the current ATR safety basis. The need for a design basis reconstitution program for the ATR has been identified along with the use of sound configuration management principles in order to support safe and efficient facility operation.« less

  19. Application of GPS and Near-Surface Geophysical Methods to Evaluate Differences Between Agricultural Test Plots

    USDA-ARS?s Scientific Manuscript database

    A field research facility with two pairs of replicated agricultural test plots (four total) was established at a location in northwest Ohio during 2005 for the purpose of studying water table management strategies. Initial efforts at this field research facility were devoted to evaluating difference...

  20. 40 CFR 264.1064 - Recordkeeping requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... facility (e.g., identify the hazardous waste management unit on a facility plot plan). (iii) Type of... schedule as specified in § 264.1033(a)(2). (3) Where an owner or operator chooses to use test data to... device, a performance test plan as specified in § 264.1035(b)(3). (4) Documentation of compliance with...

  1. 40 CFR 264.1064 - Recordkeeping requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... facility (e.g., identify the hazardous waste management unit on a facility plot plan). (iii) Type of... schedule as specified in § 264.1033(a)(2). (3) Where an owner or operator chooses to use test data to... device, a performance test plan as specified in § 264.1035(b)(3). (4) Documentation of compliance with...

  2. 40 CFR 264.1064 - Recordkeeping requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... facility (e.g., identify the hazardous waste management unit on a facility plot plan). (iii) Type of... schedule as specified in § 264.1033(a)(2). (3) Where an owner or operator chooses to use test data to... device, a performance test plan as specified in § 264.1035(b)(3). (4) Documentation of compliance with...

  3. 40 CFR 264.1064 - Recordkeeping requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... facility (e.g., identify the hazardous waste management unit on a facility plot plan). (iii) Type of... schedule as specified in § 264.1033(a)(2). (3) Where an owner or operator chooses to use test data to... device, a performance test plan as specified in § 264.1035(b)(3). (4) Documentation of compliance with...

  4. Western Aeronautical Test Range

    NASA Technical Reports Server (NTRS)

    Sakahara, Robert D.

    2008-01-01

    NASA's Western Aeronautical Test Range (WATR) is a network of facilities used to support aeronautical research, science missions, exploration system concepts, and space operations. The WATR resides at NASA's Dryden Flight Research Center located at Edwards Air Force Base, California. The WATR is a part of NASA's Corporate Management of Aeronautical Facilities and funded by the Strategic Capability Asset Program (SCAP). It is managed by the Aeronautics Test Program (ATP) of the Aeronautics Research Mission Directorate (ARMD) to provide the right facility at the right time. NASA is a tenant on Edwards Air Force Base and has an agreement with the Air Force Flight Test Center to use the land and airspace controlled by the Department of Defense (DoD). The topics include: 1) The WATR supports a variety of vehicles; 2) Dryden shares airspace with the AFFTC; 3) Restricted airspace, corridors, and special use areas are available for experimental aircraft; 4) WATR Products and Services; 5) WATR Support Configuration; 6) Telemetry Tracking; 7) Time Space Positioning; 8) Video; 9) Voice Communication; 10) Mobile Operations Facilities; 11) Data Processing; 12) Mission Control Center; 13) Real-Time Data Analysis; and 14) Range Safety.

  5. Development of an Integrated Leachate Treatment Solution for the Port Granby Waste Management Facility - 12429

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Conroy, Kevin W.; Vandergaast, Gerald

    2012-07-01

    The Port Granby Project (the Project) is located near the north shore of Lake Ontario in the Municipality of Clarington, Ontario, Canada. The Project consists of relocating approximately 450,000 m{sup 3} of historic Low-Level Radioactive Waste (LLRW) and contaminated soil from the existing Port Granby Waste Management Facility (WMF) to a proposed Long-Term Waste Management Facility (LTWMF) located adjacent to the WMF. The LTWMF will include an engineered waste containment facility, a Wastewater Treatment Plant (WTP), and other ancillary facilities. A series of bench- and pilot-scale test programs have been conducted to identify preferred treatment processes to be incorporated intomore » the WTP to treat wastewater generated during the construction, closure and post-closure periods at the WMF/LTWMF. (authors)« less

  6. Variation in Management of Patients With Obstructive Coronary Artery Disease: Insights From the Veterans Affairs Clinical Assessment and Reporting Tool (VA CART) Program.

    PubMed

    Sandhu, Amneet; Stanislawski, Maggie A; Grunwald, Gary K; Guinn, Kathryn; Valle, Javier; Matlock, Daniel; Ho, P Michael; Maddox, Thomas M; Bradley, Steven M

    2017-09-12

    Little is known about facility-level variation in the use of revascularization procedures for the management of stable obstructive coronary artery disease. Furthermore, it is unknown if variation in the use of coronary revascularization is associated with use of other cardiovascular procedures. We evaluated all elective coronary angiograms performed in the Veterans Affairs system between September 1, 2007, and December 31, 2011, using the Clinical Assessment and Reporting Tool and identified patients with obstructive coronary artery disease. Patients were considered managed with revascularization if they received percutaneous coronary intervention (PCI) or coronary artery bypass grafting within 30 days of diagnosis. We calculated risk-adjusted facility-level rates of overall revascularization, PCI, and coronary artery bypass grafting. In addition, we determined the association between facility-level rates of revascularization and post-PCI stress testing. Among 15 650 patients at 51 Veterans Affairs sites who met inclusion criteria, the median rate of revascularization was 59.6% (interquartile range, 55.7%-66.7%). Across all facilities, risk-adjusted rates of overall revascularization varied from 41.5% to 88.1%, rate of PCI varied from 23.2% to 80.6%, and rate of coronary artery bypass graftingvariedfrom 7.5% to 36.5%. Of 6179 patients who underwent elective PCI, the median rate of stress testing in the 2 years after PCI was 33.7% (interquartile range, 30.7%-47.1%). There was no evidence of correlation between facility-level rate of revascularization and follow-up stress testing. Within the Veterans Affairs system, we observed large facility-level variation in rates of revascularization for obstructive coronary artery disease, with variation driven primarily by PCI. There was no association between facility-level use of revascularization and follow-up stress testing, suggesting use rates are specific to a particular procedure and not a marker of overall facility-level use. © 2017 The Authors. Published on behalf of the American Heart Association, Inc., by Wiley.

  7. Data Acquisition System Architecture and Capabilities At NASA GRC Plum Brook Station's Space Environment Test Facilities

    NASA Technical Reports Server (NTRS)

    Evans, Richard K.; Hill, Gerald M.

    2012-01-01

    Very large space environment test facilities present unique engineering challenges in the design of facility data systems. Data systems of this scale must be versatile enough to meet the wide range of data acquisition and measurement requirements from a diverse set of customers and test programs, but also must minimize design changes to maintain reliability and serviceability. This paper presents an overview of the common architecture and capabilities of the facility data acquisition systems available at two of the world?s largest space environment test facilities located at the NASA Glenn Research Center?s Plum Brook Station in Sandusky, Ohio; namely, the Space Propulsion Research Facility (commonly known as the B-2 facility) and the Space Power Facility (SPF). The common architecture of the data systems is presented along with details on system scalability and efficient measurement systems analysis and verification. The architecture highlights a modular design, which utilizes fully-remotely managed components, enabling the data systems to be highly configurable and support multiple test locations with a wide-range of measurement types and very large system channel counts.

  8. Data Acquisition System Architecture and Capabilities at NASA GRC Plum Brook Station's Space Environment Test Facilities

    NASA Technical Reports Server (NTRS)

    Evans, Richard K.; Hill, Gerald M.

    2014-01-01

    Very large space environment test facilities present unique engineering challenges in the design of facility data systems. Data systems of this scale must be versatile enough to meet the wide range of data acquisition and measurement requirements from a diverse set of customers and test programs, but also must minimize design changes to maintain reliability and serviceability. This paper presents an overview of the common architecture and capabilities of the facility data acquisition systems available at two of the world's largest space environment test facilities located at the NASA Glenn Research Center's Plum Brook Station in Sandusky, Ohio; namely, the Space Propulsion Research Facility (commonly known as the B-2 facility) and the Space Power Facility (SPF). The common architecture of the data systems is presented along with details on system scalability and efficient measurement systems analysis and verification. The architecture highlights a modular design, which utilizes fully-remotely managed components, enabling the data systems to be highly configurable and support multiple test locations with a wide-range of measurement types and very large system channel counts.

  9. STD testing policies and practices in U.S. city and county jails.

    PubMed

    Parece, M S; Herrera, G A; Voigt, R F; Middlekauff, S L; Irwin, K L

    1999-09-01

    Studies have shown that sexually transmitted disease (STD) rates are high in the incarcerated population. However, little is known about STD testing policies or practices in jails. To assess STD testing policies and practices in jails. The Division of STD Prevention developed and distributed an e-mail survey to 94 counties reporting more than 40 primary and secondary cases in 1996 or having cities with more than 200,000 persons. State and local STD program managers completed the assessment in collaboration with health departments and the main jail facilities in the selected counties. Most facilities (52-77%) had a policy for STD screening based only on symptoms or by arrestee request, and in these facilities, 0.2% to 6% of arrestees were tested. Facilities having a policy of offering routine testing tested only 3% to 45% of arrestees. Large facilities, facilities using public providers, and facilities routinely testing for syphilis using Stat RPR tested significantly more arrestees (P<0.05). Approximately half of the arrestees were released within 48 hours after intake, whereas 45% of facilities did not have STD testing results until after 48 hours. Most facilities had a policy for STD screening based only on symptoms or by arrestee request. Facilities having a policy of routine STD testing are not testing most of the arrestees. There is a small window (<48 hours) for STD testing and treatment before release. Smaller jails and facilities using private providers may need additional resources to increase STD testing levels. Correctional facilities should be considered an important setting for STD public health intervention where routine rapid STD screening and treatment on-site could be implemented.

  10. Cryogenic Fluid Management Facility

    NASA Technical Reports Server (NTRS)

    Eberhardt, R. N.; Bailey, W. J.; Symons, E. P.; Kroeger, E. W.

    1984-01-01

    The Cryogenic Fluid Management Facility (CFMF) is a reusable test bed which is designed to be carried into space in the Shuttle cargo bay to investigate systems and technologies required to efficiently and effectively manage cryogens in space. The facility hardware is configured to provide low-g verification of fluid and thermal models of cryogenic storage, transfer concepts and processes. Significant design data and criteria for future subcritical cryogenic storage and transfer systems will be obtained. Future applications include space-based and ground-based orbit transfer vehicles (OTV), space station life support, attitude control, power and fuel depot supply, resupply tankers, external tank (ET) propellant scavenging, space-based weapon systems and space-based orbit maneuvering vehicles (OMV). This paper describes the facility and discusses the cryogenic fluid management technology to be investigated. A brief discussion of the integration issues involved in loading and transporting liquid hydrogen within the Shuttle cargo bay is also included.

  11. NASA Plum Brook's B-2 Test Facility: Thermal Vacuum and Propellant Test Facility

    NASA Technical Reports Server (NTRS)

    Kudlac, Maureen T.; Weaver, Harold F.; Cmar, Mark D.

    2012-01-01

    The National Aeronautics and Space Administration (NASA) Glenn Research Center (GRC) Plum Brook Station (PBS) Spacecraft Propulsion Research Facility, commonly referred to as B-2, is NASA's third largest thermal vacuum facility. It is the largest designed to store and transfer large quantities of liquid hydrogen and liquid oxygen, and is perfectly suited to support developmental testing of upper stage chemical propulsion systems as well as fully integrated stages. The facility is also capable of providing thermal-vacuum simulation services to support testing of large lightweight structures, Cryogenic Fluid Management (CFM) systems, electric propulsion test programs, and other In-Space propulsion programs. A recently completed integrated system test demonstrated the refurbished thermal vacuum capabilities of the facility. The test used the modernized data acquisition and control system to monitor the facility. The heat sink provided a uniform temperature environment of approximately 77 K. The modernized infrared lamp array produced a nominal heat flux of 1.4 kW/sq m. With the lamp array and heat sink operating simultaneously, the thermal systems produced a heat flux pattern simulating radiation to space on one surface and solar exposure on the other surface.

  12. Patient-, health worker-, and health facility-level determinants of correct malaria case management at publicly funded health facilities in Malawi: results from a nationally representative health facility survey.

    PubMed

    Steinhardt, Laura C; Chinkhumba, Jobiba; Wolkon, Adam; Luka, Madalitso; Luhanga, Misheck; Sande, John; Oyugi, Jessica; Ali, Doreen; Mathanga, Don; Skarbinski, Jacek

    2014-02-20

    Prompt and effective case management is needed to reduce malaria morbidity and mortality. However, malaria diagnosis and treatment is a multistep process that remains problematic in many settings, resulting in missed opportunities for effective treatment as well as overtreatment of patients without malaria. Prior to the widespread roll-out of malaria rapid diagnostic tests (RDTs) in late 2011, a national, cross-sectional, complex-sample, health facility survey was conducted in Malawi to assess patient-, health worker-, and health facility-level factors associated with malaria case management quality using multivariate Poisson regression models. Among the 2,019 patients surveyed, 34% had confirmed malaria defined as presence of fever and parasitaemia on a reference blood smear. Sixty-seven per cent of patients with confirmed malaria were correctly prescribed the first-line anti-malarial, with most cases of incorrect treatment due to missed diagnosis; 31% of patients without confirmed malaria were overtreated with an anti-malarial. More than one-quarter of patients were not assessed for fever or history of fever by health workers. The most important determinants of correct malaria case management were patient-level clinical symptoms, such as spontaneous complaint of fever to health workers, which increased both correct treatment and overtreatment by 72 and 210%, respectively (p<0.0001). Complaint of cough was associated with a 27% decreased likelihood of correct malaria treatment (p=0.001). Lower-level cadres of health workers were more likely to prescribe anti-malarials for patients, increasing the likelihood of both correct treatment and overtreatment, but no other health worker or health facility-level factors were significantly associated with case management quality. Introduction of RDTs holds potential to improve malaria case management in Malawi, but health workers must systematically assess all patients for fever, and then test and treat accordingly, otherwise, malaria control programmes might miss an opportunity to dramatically improve malaria case management, despite better diagnostic tools.

  13. Rapid assessment of infrastructure of primary health care facilities - a relevant instrument for health care systems management.

    PubMed

    Scholz, Stefan; Ngoli, Baltazar; Flessa, Steffen

    2015-05-01

    Health care infrastructure constitutes a major component of the structural quality of a health system. Infrastructural deficiencies of health services are reported in literature and research. A number of instruments exist for the assessment of infrastructure. However, no easy-to-use instruments to assess health facility infrastructure in developing countries are available. Present tools are not applicable for a rapid assessment by health facility staff. Therefore, health information systems lack data on facility infrastructure. A rapid assessment tool for the infrastructure of primary health care facilities was developed by the authors and pilot-tested in Tanzania. The tool measures the quality of all infrastructural components comprehensively and with high standardization. Ratings use a 2-1-0 scheme which is frequently used in Tanzanian health care services. Infrastructural indicators and indices are obtained from the assessment and serve for reporting and tracing of interventions. The tool was pilot-tested in Tanga Region (Tanzania). The pilot test covered seven primary care facilities in the range between dispensary and district hospital. The assessment encompassed the facilities as entities as well as 42 facility buildings and 80 pieces of technical medical equipment. A full assessment of facility infrastructure was undertaken by health care professionals while the rapid assessment was performed by facility staff. Serious infrastructural deficiencies were revealed. The rapid assessment tool proved a reliable instrument of routine data collection by health facility staff. The authors recommend integrating the rapid assessment tool in the health information systems of developing countries. Health authorities in a decentralized health system are thus enabled to detect infrastructural deficiencies and trace the effects of interventions. The tool can lay the data foundation for district facility infrastructure management.

  14. Transuranic Waste Test Facility Development Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Looper, M.G.

    1987-05-05

    This letter discusses the development and test program planned for the Transuranic Waste Test Facility (TWTF). The planned effort is based on previous work in the ADandD Pilot Facility and testing of TWTF equipment before installation. Input from Waste Management and AED Fairview is included. The program will focus on the following areas: Retrieval; Material Handling; Size Reduction; Operation and Maintenance. The program will take 1-1/2 to 2 years to complete and began in December 1986. Technical Data Summaries (TDS) and basic data reports will be issued periodically to document results and provide basic data for the Transuranic Waste Facilitymore » (TWF). 2 refs., 2 figs.« less

  15. Refurbishment and Automation of Thermal Vacuum Facilities at NASA/GSFC

    NASA Technical Reports Server (NTRS)

    Dunn, Jamie; Gomez, Carlos; Donohue, John; Johnson, Chris; Palmer, John; Sushon, Janet

    1999-01-01

    The thermal vacuum facilities located at the Goddard Space Flight Center (GSFC) have supported both manned and unmanned space flight since the 1960s. Of the eleven facilities, currently ten of the systems are scheduled for refurbishment or replacement as part of a five-year implementation. Expected return on investment includes the reduction in test schedules, improvements in safety of facility operations, and reduction in the personnel support required for a test. Additionally, GSFC will become a global resource renowned for expertise in thermal engineering, mechanical engineering, and for the automation of thermal vacuum facilities and tests. Automation of the thermal vacuum facilities includes the utilization of Programmable Logic Controllers (PLCs), the use of Supervisory Control and Data Acquisition (SCADA) systems, and the development of a centralized Test Data Management System. These components allow the computer control and automation of mechanical components such as valves and pumps. The project of refurbishment and automation began in 1996 and has resulted in complete computer control of one facility (Facility 281), and the integration of electronically controlled devices and PLCs in multiple others.

  16. Refurbishment and Automation of Thermal Vacuum Facilities at NASA/GSFC

    NASA Technical Reports Server (NTRS)

    Dunn, Jamie; Gomez, Carlos; Donohue, John; Johnson, Chris; Palmer, John; Sushon, Janet

    1998-01-01

    The thermal vacuum facilities located at the Goddard Space Flight Center (GSFC) have supported both manned and unmanned space flight since the 1960s. Of the eleven facilities, currently ten of the systems are scheduled for refurbishment or replacement as part of a five-year implementation. Expected return on investment includes the reduction in test schedules, improvements in safety of facility operations, and reduction in the personnel support required for a test. Additionally, GSFC will become a global resource renowned for expertise in thermal engineering, mechanical engineering, and for the automation of thermal vacuum facilities and tests. Automation of the thermal vacuum facilities includes the utilization of Programmable Logic Controllers (PLCs), the use of Supervisory Control and Data Acquisition (SCADA) systems, and the development of a centralized Test Data Management System. These components allow the computer control and automation of mechanical components such as valves and pumps. The project of refurbishment and automation began in 1996 and has resulted in complete computer control of one facility (Facility 281), and the integration of electronically controlled devices and PLCs in multiple others.

  17. Major improvements in the quality of malaria case-management under the "test and treat" policy in Kenya.

    PubMed

    Zurovac, Dejan; Githinji, Sophie; Memusi, Dorothy; Kigen, Samuel; Machini, Beatrice; Muturi, Alex; Otieno, Gabriel; Snow, Robert W; Nyandigisi, Andrew

    2014-01-01

    Monitoring implementation of the "test and treat" case-management policy for malaria is an important component of all malaria control programmes in Africa. Unfortunately, routine information systems are commonly deficient to provide necessary information. Using health facility surveys we monitored health systems readiness and malaria case-management practices prior to and following implementation of the 2010 "test and treat" policy in Kenya. Between 2010 and 2013 six national, cross-sectional, health facility surveys were undertaken. The number of facilities assessed ranged between 172 and 176, health workers interviewed between 216 and 237 and outpatient consultations for febrile patients evaluated between 1,208 and 2,408 across six surveys. Comparing baseline and the last survey results, all readiness indicators showed significant (p<0.005) improvements: availability of parasitological diagnosis (55.2% to 90.7%); RDT availability (7.5% to 69.8%); total artemether-lumefantrine (AL) stock-out (27.2% to 7.0%); stock-out of one or more AL packs (59.5% to 21.6%); training coverage (0 to 50.2%); guidelines access (0 to 58.1%) and supervision (17.9% to 30.8%). Testing increased by 34.0% (23.9% to 57.9%; p<0.001) while testing and treatment according to test result increased by 34.2% (15.7% to 49.9%; p<0.001). Treatment adherence for test positive patients improved from 83.3% to 90.3% (p = 0.138) and for test negative patients from 47.9% to 83.4% (p<0.001). Significant testing and treatment improvements were observed in children and adults. There was no difference in practices with respect to the type and result of malaria test (RDT vs microscopy). Of eight dosing, dispensing and counseling tasks, improvements were observed for four tasks. Overall AL use for febrile patients decreased from 63.5% to 35.6% (p<0.001). Major improvements in the implementation of "test and treat" policy were observed in Kenya. Some gaps towards universal targets still remained. Other countries facing similar needs and challenges may consider health facility surveys to monitor malaria case-management.

  18. [Medical safety management in the setting of a clinical reference laboratory--risk management efforts in clinical testing].

    PubMed

    Seki, Akira; Miya, Tetsumasa

    2011-03-01

    As a result of recurring medical accidents, risk management in the medical setting has been given much attention. The announcement in August, 2000 by the Ministry of Health committee for formulating a standard manual for risk management, of a "Risk management manual formulation guideline" has since been accompanied by the efforts of numerous medical testing facilities to develop such documents. In 2008, ISO/TS 22367:2008 on "Medical laboratories-Reduction of error through risk management and continual improvement" was published. However, at present, risk management within a medical testing facility stresses the implementation of provisional actions in response to a problem after it has occurred. Risk management is basically a planned process and includes "corrective actions" as well as "preventive actions." A corrective action is defined as identifying the root cause of the problem and removing it, and is conducted to prevent the problem from recurring. A preventive action is defined as identifying of the any potential problem and removing it, and is conducted to prevent a problem before it occurs. Presently, I shall report on the experiences of our laboratory regarding corrective and preventive actions taken in response to accidents and incidents, respectively.

  19. Avionics test bed development plan

    NASA Technical Reports Server (NTRS)

    Harris, L. H.; Parks, J. M.; Murdock, C. R.

    1981-01-01

    A development plan for a proposed avionics test bed facility for the early investigation and evaluation of new concepts for the control of large space structures, orbiter attached flex body experiments, and orbiter enhancements is presented. A distributed data processing facility that utilizes the current laboratory resources for the test bed development is outlined. Future studies required for implementation, the management system for project control, and the baseline system configuration are defined. A background analysis of the specific hardware system for the preliminary baseline avionics test bed system is included.

  20. A Method for Calculating the Probability of Successfully Completing a Rocket Propulsion Ground Test

    NASA Technical Reports Server (NTRS)

    Messer, Bradley

    2007-01-01

    Propulsion ground test facilities face the daily challenge of scheduling multiple customers into limited facility space and successfully completing their propulsion test projects. Over the last decade NASA s propulsion test facilities have performed hundreds of tests, collected thousands of seconds of test data, and exceeded the capabilities of numerous test facility and test article components. A logistic regression mathematical modeling technique has been developed to predict the probability of successfully completing a rocket propulsion test. A logistic regression model is a mathematical modeling approach that can be used to describe the relationship of several independent predictor variables X(sub 1), X(sub 2),.., X(sub k) to a binary or dichotomous dependent variable Y, where Y can only be one of two possible outcomes, in this case Success or Failure of accomplishing a full duration test. The use of logistic regression modeling is not new; however, modeling propulsion ground test facilities using logistic regression is both a new and unique application of the statistical technique. Results from this type of model provide project managers with insight and confidence into the effectiveness of rocket propulsion ground testing.

  1. Space shuttle program: Shuttle Avionics Integration Laboratory. Volume 7: Logistics management plan

    NASA Technical Reports Server (NTRS)

    1974-01-01

    The logistics management plan for the shuttle avionics integration laboratory defines the organization, disciplines, and methodology for managing and controlling logistics support. Those elements requiring management include maintainability and reliability, maintenance planning, support and test equipment, supply support, transportation and handling, technical data, facilities, personnel and training, funding, and management data.

  2. Development of a Work Control System for Propulsion Testing at Stennis Space Center (SSC)

    NASA Technical Reports Server (NTRS)

    Messer, Elizabeth A.

    2004-01-01

    In 1996, Stennis Space Center was given management authority for all Propulsion Testing for NASA. Over the next few years several research and development (R&D) test facilities were completed and brought up to full operation in what is known as the E-Complex Test Facility at Stennis Space Center. This paper will explain the requirements and steps taken to develop the current Test Operations' electronic work control system. The Work Control System developed includes work authorization documents such as test preparation sheets, discrepancy reports, pre-test briefing reports, and test requests.

  3. Development of the advanced life support Systems Integration Research Facility at NASA's Johnson Space Center

    NASA Technical Reports Server (NTRS)

    Tri, Terry O.; Thompson, Clifford D.

    1992-01-01

    Future NASA manned missions to the moon and Mars will require development of robust regenerative life support system technologies which offer high reliability and minimal resupply. To support the development of such systems, early ground-based test facilities will be required to demonstrate integrated, long-duration performance of candidate regenerative air revitalization, water recovery, and thermal management systems. The advanced life support Systems Integration Research Facility (SIRF) is one such test facility currently being developed at NASA's Johnson Space Center. The SIRF, when completed, will accommodate unmanned and subsequently manned integrated testing of advanced regenerative life support technologies at ambient and reduced atmospheric pressures. This paper provides an overview of the SIRF project, a top-level description of test facilities to support the project, conceptual illustrations of integrated test article configurations for each of the three SIRF systems, and a phased project schedule denoting projected activities and milestones through the next several years.

  4. Flow analysis of metals in a municipal solid waste management system.

    PubMed

    Jung, C H; Matsuto, T; Tanaka, N

    2006-01-01

    This study aimed to identify the metal flow in a municipal solid waste (MSW) management system. Outputs of a resource recovery facility, refuse derived fuel (RDF) production facility, carbonization facility, plastics liquefaction facility, composting facility, and bio-gasification facility were analyzed for metal content and leaching concentration. In terms of metal content, bulky and incombustible waste had the highest values. Char from a carbonization facility, which treats household waste, had a higher metal content than MSW incinerator bottom ash. A leaching test revealed that Cd and Pb in char and Pb in RDF production residue exceeded the Japanese regulatory criteria for landfilling, so special attention should be paid to final disposal of these substances. By multiplying metal content and the generation rate of outputs, the metal content of input waste to each facility was estimated. For most metals except Cr, the total contribution ratio of paper/textile/plastics, bulky waste, and incombustible waste was over 80%. Approximately 30% of Cr originated from plastic packaging. Finally, several MSW management scenarios showed that most metals are transferred to landfills and the leaching potential of metals to the environment is quite small.

  5. Flow analysis of metals in a municipal solid waste management system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jung, C.H.; Matsuto, T.; Tanaka, N.

    2006-07-01

    This study aimed to identify the metal flow in a municipal solid waste (MSW) management system. Outputs of a resource recovery facility, refuse derived fuel (RDF) production facility, carbonization facility, plastics liquefaction facility, composting facility, and bio-gasification facility were analyzed for metal content and leaching concentration. In terms of metal content, bulky and incombustible waste had the highest values. Char from a carbonization facility, which treats household waste, had a higher metal content than MSW incinerator bottom ash. A leaching test revealed that Cd and Pb in char and Pb in RDF production residue exceeded the Japanese regulatory criteria formore » landfilling, so special attention should be paid to final disposal of these substances. By multiplying metal content and the generation rate of outputs, the metal content of input waste to each facility was estimated. For most metals except Cr, the total contribution ratio of paper/textile/plastics, bulky waste, and incombustible waste was over 80%. Approximately 30% of Cr originated from plastic packaging. Finally, several MSW management scenarios showed that most metals are transferred to landfills and the leaching potential of metals to the environment is quite small.« less

  6. Central Inertial and GPS Test Facility (CIGTF) Customer Handbook

    DTIC Science & Technology

    2007-08-01

    capabilities offer the customer a cost-effective means to evaluate their guidance and navigation systems. The 746 TS also manages the tri-service GPS...minimum your test manager ur test or current phase of testing is complete. 4.0 Customer Feedback The 746 TS works very hard to provide its customers ... Customer Handbook August 2007 HOLLOMAN AFB, NEW MEXICO Distribution Statement A Approved for public release: distribution is

  7. Calendar year 2003 : annual site enviromental report for Tonopah Test Range, Nevada and Kauai Test Facility, Hawaii.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wagner, Katrina; Sanchez, Rebecca V.; Mayeux, Lucie

    2004-09-01

    Tonopah Test Range (TTR) in Nevada and Kauai Test Facility (KTF) in Hawaii are government-owned, contractor-operated facilities operated by Sandia Corporation, a subsidiary of Lockheed Martin Corporation. The U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA), through the Sandia Site Office (SSO), in Albuquerque, NM, manages TTR and KTF's operations. Sandia Corporation conducts operations at TTR in support of DOE/NNSA's Weapons Ordnance Program and has operated the site since 1957. Westinghouse Government Services subcontracts to Sandia Corporation in administering most of the environmental programs at TTR. Sandia Corporation operates KTF as a rocket preparation launching and tracking facility.more » This Annual Site Environmental Report (ASER) summarizes data and the compliance status of the environmental protection and monitoring program at TTR and KTF through Calendar Year (CY) 2003. The compliance status of environmental regulations applicable at these sites include state and federal regulations governing air emissions, wastewater effluent, waste management, terrestrial surveillance, and Environmental Restoration (ER) cleanup activities. Sandia Corporation is responsible only for those environmental program activities related to its operations. The DOE/NNSA, Nevada Site Office (NSO) retains responsibility for the cleanup and management of ER TTR sites. Currently, there are no ER Sites at KTF. Environmental monitoring and surveillance programs are required by DOE Order 450.1, Environmental Protection Program (DOE 2003) and DOE Order 231.1 Chg 2., Environment, Safety, and Health Reporting (DOE 1996).« less

  8. The Development of the Multi-Center Traffic Management Advisor (MCTMA): Traffic Flow Management Research in a Multi-Facility Environment

    NASA Technical Reports Server (NTRS)

    Lee, Katharine K.; Davis, Thomas J.; Levin, Kerry M.; Rowe, Dennis W.

    2001-01-01

    The Traffic Management Advisor (TMA) is a decision-support tool for traffic managers and air traffic controllers that provides traffic flow visualization and other flow management tools. TMA creates an efficiently sequenced and safely spaced schedule for arrival traffic that meets but does not exceed specified airspace system constraints. TMA is being deployed at selected facilities throughout the National Airspace System in the US as part of the FAA's Free Flight Phase 1 program. TMA development and testing, and its current deployment, focuses on managing the arrival capacity for single major airports within single terminal areas and single en route centers. The next phase of development for this technology is the expansion of the TMA capability to complex facilities in which a terminal area or airport is fed by multiple en route centers, thus creating a multicenter TMA functionality. The focus of the multi-center TMA (McTMA) development is on the busy facilities in the Northeast comdor of the US. This paper describes the planning and development of McTMA and the challenges associated with adapting a successful traffic flow management tool for a very complex airspace.

  9. Skylab Medical Experiments Altitude Test /SMEAT/ facility design and operation.

    NASA Technical Reports Server (NTRS)

    Hinners, A. H., Jr.; Correale, J. V.

    1973-01-01

    This paper presents the design approaches and test facility operation methods used to successfully accomplish a 56-day test for Skylab to permit evaluation of selected Skylab medical experiments in a ground test simulation of the Skylab environment with an astronaut crew. The systems designed for this test include the two-gas environmental control system, the fire suppression and detection system, equipment transfer lock, ground support equipment, safety systems, potable water system, waste management system, lighting and power system, television monitoring, communications and recreation systems, and food freezer.

  10. Senator Doug Jones (D-AL) Tour of MSFC Facilities

    NASA Image and Video Library

    2018-02-22

    Senator Doug Jones (D-AL.) and wife, Louise, tour Marshall Space Flight facilities. Steve Doering, manager, Stages Element, Space Launch System (SLS) program at MSFC, along with Senator and Mrs. Jones, viewed the MSFC campus from the top of test stand 4693.

  11. Using mobile phone text messaging for malaria surveillance in rural Kenya

    PubMed Central

    2014-01-01

    Background Effective surveillance systems are required to track malaria testing and treatment practices. A 26-week study “SMS for Life” was piloted in five rural districts of Kenya to examine whether SMS reported surveillance data could ensure real-time visibility of accurate data and their use by district managers to impact on malaria case-management. Methods Health workers from 87 public health facilities used their personal mobile phones to send a weekly structured SMS text message reporting the counts of four basic surveillance data elements to a web-based system accessed by district managers. Longitudinal monitoring of SMS reported data through the web-based system and two rounds of cross-sectional health facility surveys were done to validate accuracy of data. Results Mean response rates were 96% with 87% of facilities reporting on time. Fifty-eight per cent of surveillance data parameters were accurately reported. Overall mean testing rates were 37% with minor weekly variations ranging from 32 to 45%. Overall test positivity rate was 24% (weekly range: 17-37%). Ratio of anti-malarial treatments to test positive cases was 1.7:1 (weekly range: 1.3:1–2.2:1). District specific trends showed fluctuating patterns in testing rates without notable improvement over time but the ratio of anti-malarial treatments to test positive cases improved over short periods of time in three out of five districts. Conclusions The study demonstrated the feasibility of using simple mobile phone text messages to transmit timely surveillance data from peripheral health facilities to higher levels. However, accuracy of data reported was suboptimal. Future work should focus on improving quality of SMS reported surveillance data. PMID:24642130

  12. The Planning and Implementation of Test Facility Improvements

    NASA Technical Reports Server (NTRS)

    Oberlander, Larry

    2008-01-01

    As engineering programs develop, and product testing begins, ideas for process improvement soon become obvious. Engineers envision new holding and handling fixtures. Additional custom-made support equipment may be needed. Perhaps modifications to the building or modifications to facility hardware are the order of the day. This is where a flexible creative test organization is needed. We need not be content with the status quo. All of these desired test innovations can make the difficult easy and improve the work flow. At times, implementing these new ideas demands more time or specialized expertise than test team members have. Through the coordinated use of labor resources, the needed improvements can still be made and in a timely fashion that supports program schedules. This presentation provides practical advice and a method whereby test personnel can creatively develop facility improvements and manage them from start to finish. You can control just how much time you invest and what part of your concepts you will personally design. By wisely defining the requirements and presenting them to the appropriate help sources (vendors, contractors, coworkers, and support departments), you can get the help you need to bring the improvements you have conceived, into fruition. Aspects of this presentation include defining requirements for test facility improvements, choosing labor resources, writing a statement of work, determining cost and benefits, securing department approval, coordinating procurement, managing the project, and training the end users. The process of successfully implementing test facility improvements is thoroughly explained. It has been tried, proven and improved over nearly 25 years of use. Whether considering a $50 improvement or a $50 million dollar improvement, this discussion will provide helpful pointers. Examples of improvements made through this process and their illustration will be included.

  13. Cryogenic Fluid Management Facility

    NASA Technical Reports Server (NTRS)

    Eberhardt, R. N.; Bailey, W. J.

    1985-01-01

    The Cryogenic Fluid Management Facility is a reusable test bed which is designed to be carried within the Shuttle cargo bay to investigate the systems and technologies associated with the efficient management of cryogens in space. Cryogenic fluid management consists of the systems and technologies for: (1) liquid storage and supply, including capillary acquisition/expulsion systems which provide single-phase liquid to the user system, (2) both passive and active thermal control systems, and (3) fluid transfer/resupply systems, including transfer lines and receiver tanks. The facility contains a storage and supply tank, a transfer line and a receiver tank, configured to provide low-g verification of fluid and thermal models of cryogenic storage and transfer processes. The facility will provide design data and criteria for future subcritical cryogenic storage and transfer system applications, such as Space Station life support, attitude control, power and fuel depot supply, resupply tankers, external tank (ET) propellant scavenging, and ground-based and space-based orbit transfer vehicles (OTV).

  14. KSC-2014-2644

    NASA Image and Video Library

    2014-05-21

    CAPE CANAVERAL, Fla. – From left, Chirold Epp, the Autonomous Landing and Hazard Avoidance Technology, or ALHAT, project manager, and Jon Olansen, Morpheus project manager, speak to members of the media near the north end of the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida. Media also viewed Morpheus inside a facility near the landing facility. Project Morpheus tests NASA’s ALHAT and an engine that runs on liquid oxygen and methane, which are green propellants. These new capabilities could be used in future efforts to deliver cargo to planetary surfaces. The landing facility provides the lander with the kind of field necessary for realistic testing, complete with rocks, craters and hazards to avoid. Morpheus’ ALHAT payload allows it to navigate to clear landing sites amidst rocks, craters and other hazards during its descent. Project Morpheus is being managed under the Advanced Exploration Systems, or AES, Division in NASA’s Human Exploration and Operations Mission Directorate. The efforts in AES pioneer new approaches for rapidly developing prototype systems, demonstrating key capabilities and validating operational concepts for future human missions beyond Earth orbit. For more information on Project Morpheus, visit http://morpheuslander.jsc.nasa.gov/. Photo credit: NASA/Frankie Martin

  15. Ageing management program for the Spanish low and intermediate level waste disposal and spent fuel and high-level waste centralised storage facilities

    NASA Astrophysics Data System (ADS)

    Zuloaga, P.; Ordoñez, M.; Andrade, C.; Castellote, M.

    2011-04-01

    The generic design of the centralised spent fuel storage facility was approved by the Spanish Safety Authority in 2006. The planned operational life is 60 years, while the design service life is 100 years. Durability studies and surveillance of the behaviour have been considered from the initial design steps, taking into account the accessibility limitations and temperatures involved. The paper presents an overview of the ageing management program set in support of the Performance Assessment and Safety Review of El Cabril low and intermediate level waste (LILW) disposal facility. Based on the experience gained for LILW, ENRESA has developed a preliminary definition of the Ageing Management Plan for the Centralised Interim Storage Facility of spent Fuel and High Level Waste (HLW), which addresses the behaviour of spent fuel, its retrievability, the confinement system and the reinforced concrete structure. It includes tests plans and surveillance design considerations, based on the El Cabril LILW disposal facility.

  16. Engineering directorate technical facilities catalog

    NASA Technical Reports Server (NTRS)

    Maloy, Joseph E.

    1993-01-01

    The Engineering Directorate Technical Facilities Catalog is designed to provide an overview of the technical facilities available within the Engineering Directorate at the National Aeronautics and Space Administration (NASA), Lyndon B. Johnson Space Center (JSC) in Houston, Texas. The combined capabilities of these engineering facilities are essential elements of overall JSC capabilities required to manage and perform major NASA engineering programs. The facilities are grouped in the text by chapter according to the JSC division responsible for operation of the facility. This catalog updates the facility descriptions for the JSC Engineering Directorate Technical Facilities Catalog, JSC 19295 (August 1989), and supersedes the Engineering Directorate, Principle test and Development Facilities, JSC, 19962 (November 1984).

  17. Configuration management issues and objectives for a real-time research flight test support facility

    NASA Technical Reports Server (NTRS)

    Yergensen, Stephen; Rhea, Donald C.

    1988-01-01

    An account is given of configuration management activities for the Western Aeronautical Test Range (WATR) at NASA-Ames, whose primary function is the conduct of aeronautical research flight testing through real-time processing and display, tracking, and communications systems. The processing of WATR configuration change requests for specific research flight test projects must be conducted in such a way as to refrain from compromising the reliability of WATR support to all project users. Configuration management's scope ranges from mission planning to operations monitoring and performance trend analysis.

  18. Space Propulsion Research Facility (B-2): An Innovative, Multi-Purpose Test Facility

    NASA Technical Reports Server (NTRS)

    Hill, Gerald M.; Weaver, Harold F.; Kudlac, Maureen T.; Maloney, Christian T.; Evans, Richard K.

    2011-01-01

    The Space Propulsion Research Facility, commonly referred to as B-2, is designed to hot fire rocket engines or upper stage launch vehicles with up to 890,000 N force (200,000 lb force), after environmental conditioning of the test article in simulated thermal vacuum space environment. As NASA s third largest thermal vacuum facility, and the largest designed to store and transfer large quantities of propellant, it is uniquely suited to support developmental testing associated with large lightweight structures and Cryogenic Fluid Management (CFM) systems, as well as non-traditional propulsion test programs such as Electric and In-Space propulsion. B-2 has undergone refurbishment of key subsystems to support the NASA s future test needs, including data acquisition and controls, vacuum, and propellant systems. This paper details the modernization efforts at B-2 to support the Nation s thermal vacuum/propellant test capabilities, the unique design considerations implemented for efficient operations and maintenance, and ultimately to reduce test costs.

  19. Productivity of Veterans Health Administration laboratories: a College of American Pathologists Laboratory Management Index Program (LMIP) study.

    PubMed

    Valenstein, Paul N; Wang, Edward; O'Donohue, Tom

    2003-12-01

    The Veterans Health Administration (VA) operates the largest integrated laboratory network in the United States. To assess whether the unique characteristics of VA laboratories impact efficiency of operations, we compared the productivity of VA and non-VA facilities. Financial and activity data were prospectively collected from 124 VA and 131 non-VA laboratories enrolled in the College of American Pathologists Laboratory Management Index Program (LMIP) during 2002. In addition, secular trends in 5 productivity ratios were calculated for VA and non-VA laboratories enrolled in LMIP from 1997 through 2002. Veterans Health Administration and non-VA facilities did not differ significantly in size. Inpatients accounted for a lower percentage of testing at VA facilities than non-VA facilities (21.7% vs 37.3%; P <.001). Technical staff at the median VA facility were paid more than at non-VA facilities (28.11/h dollars vs 22.60/h dollars, salaries plus benefits; P <.001), VA laboratories employed a smaller percentage of nontechnical staff (30.0% vs 41.9%; P <.001), and workers at VA laboratories worked less time per hour paid (85.5% vs 88.5%; P <.001). However, labor productivity was significantly higher at VA than at non-VA facilities (30 448 test results/total full-time equivalent (FTE)/y vs 19 260 results/total FTE; P <.001), resulting in lower labor expense per on-site test at VA sites than at non-VA sites (1.79 dollars/result vs 2.08 dollars/result; P <.001). Veterans Health Administration laboratories paid less per test for consumables (P =.003), depreciation, and maintenance than their non-VA counterparts (all P <.001), resulting in lower overall cost per on-site test result (2.64 dollars vs 3.40 dollars; P <.001). Cost per referred (sent-out) test did not differ significantly between the 2 groups. Analysis of 6-year trends showed significant increases in both VA (P <.001) and non-VA (P =.02) labor productivity (on-site tests/total FTE). Expenses at VA laboratories for labor per test, consumables per test, overall expense per test, and overall laboratory expense per discharge decreased significantly during the 6-year period (P <.001), while in non-VA facilities the corresponding ratios showed no significant change. Overall productivity of VA laboratories is superior to that of non-VA facilities enrolled in LMIP. The principal advantages enjoyed by the VA are higher-than-average labor productivity (tests/FTE) and lower-than-average consumable expenses.

  20. The prevention of mother-to-child transmission of HIV cascade analysis tool: supporting health managers to improve facility-level service delivery.

    PubMed

    Gimbel, Sarah; Voss, Joachim; Mercer, Mary Anne; Zierler, Brenda; Gloyd, Stephen; Coutinho, Maria de Joana; Floriano, Florencia; Cuembelo, Maria de Fatima; Einberg, Jennifer; Sherr, Kenneth

    2014-10-21

    The objective of the prevention of Mother-to-Child Transmission (pMTCT) cascade analysis tool is to provide frontline health managers at the facility level with the means to rapidly, independently and quantitatively track patient flows through the pMTCT cascade, and readily identify priority areas for clinic-level improvement interventions. Over a period of six months, five experienced maternal-child health managers and researchers iteratively adapted and tested this systems analysis tool for pMTCT services. They prioritized components of the pMTCT cascade for inclusion, disseminated multiple versions to 27 health managers and piloted it in five facilities. Process mapping techniques were used to chart PMTCT cascade steps in these five facilities, to document antenatal care attendance, HIV testing and counseling, provision of prophylactic anti-retrovirals, safe delivery, safe infant feeding, infant follow-up including HIV testing, and family planning, in order to obtain site-specific knowledge of service delivery. Seven pMTCT cascade steps were included in the Excel-based final tool. Prevalence calculations were incorporated as sub-headings under relevant steps. Cells not requiring data inputs were locked, wording was simplified and stepwise drop-offs and maximization functions were included at key steps along the cascade. While the drop off function allows health workers to rapidly assess how many patients were lost at each step, the maximization function details the additional people served if only one step improves to 100% capacity while others stay constant. Our experience suggests that adaptation of a cascade analysis tool for facility-level pMTCT services is feasible and appropriate as a starting point for discussions of where to implement improvement strategies. The resulting tool facilitates the engagement of frontline health workers and managers who fill out, interpret, apply the tool, and then follow up with quality improvement activities. Research on adoption, interpretation, and sustainability of this pMTCT cascade analysis tool by frontline health managers is needed. ClinicalTrials.gov NCT02023658, December 9, 2013.

  1. Challenges with implementing malaria rapid diagnostic tests at primary care facilities in a Ghanaian district: a qualitative study.

    PubMed

    Boadu, Nana Yaa; Amuasi, John; Ansong, Daniel; Einsiedel, Edna; Menon, Devidas; Yanow, Stephanie K

    2016-02-27

    Rapid diagnostic Tests (RDTs) for malaria enable diagnostic testing at primary care facilities in resource-limited settings, where weak infrastructure limits the use of microscopy. In 2010, Ghana adopted a test-before-treat guideline for malaria, with RDT use promoted to facilitate diagnosis. Yet healthcare practitioners still treat febrile patients without testing, or despite negative malaria test results. Few studies have explored RDT implementation beyond the notions of provider or patient acceptability. The aim of this study was to identify the factors directly influencing malaria RDT implementation at primary care facilities in a Ghanaian district. Qualitative interviews, focus groups and direct observations were conducted with 50 providers at six purposively selected primary care facilities in the Atwima-Nwabiagya district. Data were analysed thematically. RDT implementation was hampered by: (1) healthcare delivery constraints (weak supply chain, limited quality assurance and control, inadequate guideline emphasis, staffing limitations); (2) provider perceptions (entrenched case-management paradigms, limited preparedness for change); (3) social dynamics of care delivery (expected norms of provider-patient interaction, test affordability); and (4) limited provider engagement in policy processes leading to fragmented implementation of health sector reform. Limited health system capacity, socio-economic, political, and historical factors hampered malaria RDT implementation at primary care facilities in the study district. For effective RDT implementation providers must be: (1) adequately enabled through efficient allocation and management of essential healthcare commodities; (2) appropriately empowered with the requisite knowledge and skill through ongoing, effective professional development; and (3) actively engaged in policy dialogue to demystify socio-political misconceptions that hinder health sector reform policies from improving care delivery. Clear, consistent guideline emphasis, with complementary action to address deep-rooted provider concerns will build their confidence in, and promote uptake of recommended policies, practices, and technology for diagnosing malaria.

  2. Crew Systems Laboratory/Building 7. Historical Documentation

    NASA Technical Reports Server (NTRS)

    Slovinac, Patricia

    2011-01-01

    Building 7 is managed by the Crew and Thermal Systems Division of the JSC Engineering Directorate. Originally named the Life Systems Laboratory, it contained five major test facilities: two advanced environmental control laboratories and three human-rated vacuum chambers (8 , 11 , and the 20 ). These facilities supported flight crew familiarization and the testing and evaluation of hardware used in the early manned spaceflight programs, including Gemini, Apollo, and the ASTP.

  3. 43 CFR 3271.10 - What do I need to start preparing a site and building and testing a utilization facility on...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false What do I need to start preparing a site and building and testing a utilization facility on Federal land leased for geothermal resources? 3271.10 Section 3271.10 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR...

  4. 43 CFR 3271.10 - What do I need to start preparing a site and building and testing a utilization facility on...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false What do I need to start preparing a site and building and testing a utilization facility on Federal land leased for geothermal resources? 3271.10 Section 3271.10 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR...

  5. 43 CFR 3271.10 - What do I need to start preparing a site and building and testing a utilization facility on...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false What do I need to start preparing a site and building and testing a utilization facility on Federal land leased for geothermal resources? 3271.10 Section 3271.10 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR...

  6. 43 CFR 3271.10 - What do I need to start preparing a site and building and testing a utilization facility on...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false What do I need to start preparing a site and building and testing a utilization facility on Federal land leased for geothermal resources? 3271.10 Section 3271.10 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR...

  7. 2016 Annual Site Environmental report Sandia National Laboratories Tonopah Test Range Nevada & Kaua'i Test Facility Hawai'i.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Salas, Angela Maria; Griffith, Stacy R.

    Sandia National Laboratories (SNL) is a multimission laboratory managed and operated by National Technology & Engineering Solutions of Sandia, LLC, a wholly owned subsidiary of Honeywell International Inc., for the U.S. Department of Energy’s (DOE’s), National Nuclear Security Administration (NNSA) under contract DE-NA0003525. The DOE/NNSA Sandia Field Office administers the contract and oversees contractor operations at the SNL, Tonopah Test Range (SNL/TTR) in Nevada and the SNL, Kaua‘i Test Facility (SNL/KTF) in Hawai‘i. SNL personnel manage and conduct operations at SNL/TTR in support of the DOE/NNSA’s Weapons Ordnance Program and have operated the site since 1957. Navarro Research and Engineeringmore » personnel perform most of the environmental programs activities at SNL/TTR. The DOE/NNSA/Nevada Field Office retains responsibility for cleanup and management of SNL/TTR Environmental Restoration sites. SNL personnel operate SNL/KTF as a rocket preparation launching and tracking facility. This Annual Site Environmental Report (ASER) summarizes data and the compliance status of sustainability, environmental protection, and monitoring programs at SNL/TTR and SNL/KTF during calendar year 2016. Major environmental programs include air quality, water quality, groundwater protection, terrestrial and biological surveillance, waste management, pollution prevention, environmental restoration, oil and chemical spill prevention, and implementation of the National Environmental Policy Act. This ASER is prepared in accordance with and as required by DOE O 231.1B, Admin Change 1, Environment, Safety, and Health Reporting.« less

  8. 2014 QuickCompass of TRICARE Child Beneficiaries: Utilization of Medicaid-Waivered Services. Tabulation of Responses

    DTIC Science & Technology

    2014-08-30

    management) Long term care (e.g., home health care, hospice, integrated personal care, intermediate care facilities for the mentally retarded, nurse ... aide training and testing, and nursing facilities) Medical equipment (e.g., medically necessary supplies, including oxygen, catheters, and reusable

  9. Refurbishment and Automation of the Thermal/Vacuum Facilities at the Goddard Space Flight Center

    NASA Technical Reports Server (NTRS)

    Donohue, John T.; Johnson, Chris; Ogden, Rick; Sushon, Janet

    1998-01-01

    The thermal/vacuum facilities located at the Goddard Space Flight Center (GSFC) have supported both manned and unmanned space flight since the 1960s. Of the 11 facilities, currently 10 of the systems are scheduled for refurbishment and/or replacement as part of a 5-year implementation. Expected return on investment includes the reduction in test schedules, improvements in the safety of facility operations, reduction in the complexity of a test and the reduction in personnel support required for a test. Additionally, GSFC will become a global resource renowned for expertise in thermal engineering, mechanical engineering and for the automation of thermal/vacuum facilities and thermal/vacuum tests. Automation of the thermal/vacuum facilities includes the utilization of Programmable Logic Controllers (PLCs) and the use of Supervisory Control and Data Acquisition (SCADA) systems. These components allow the computer control and automation of mechanical components such as valves and pumps. In some cases, the chamber and chamber shroud require complete replacement while others require only mechanical component retrofit or replacement. The project of refurbishment and automation began in 1996 and has resulted in the computer control of one Facility (Facility #225) and the integration of electronically controlled devices and PLCs within several other facilities. Facility 225 has been successfully controlled by PLC and SCADA for over one year. Insignificant anomalies have occurred and were resolved with minimal impact to testing and operations. The amount of work remaining to be performed will occur over the next four to five years. Fiscal year 1998 includes the complete refurbishment of one facility, computer control of the thermal systems in two facilities, implementation of SCADA and PLC systems to support multiple facilities and the implementation of a Database server to allow efficient test management and data analysis.

  10. CHALLENGES IN SETTING UP QUALITY CONTROL IN DIAGNOSTIC RADIOLOGY FACILITIES IN NIGERIA.

    PubMed

    Inyang, S O; Egbe, N O; Ekpo, E

    2015-01-01

    The Nigerian Nuclear Regulatory Authority (NNRA) was established to regulate and control the use of radioactive and radiation emitting sources in Nigeria. Quality control (QC) on diagnostic radiology equipment form part of the fundamental requirements for the authorization of diagnostic radiology facilities in the Country. Some quality control tests (output, exposure linearity and reproducibility) were measured on the x-ray machines in the facilities that took part in the study. Questionnaire was developed to evaluate the frequencies at which QC tests were conducted in the facilities and the challenges in setting up QC. Results show great variation in the values of the QC parameters measured. Inadequate cooperation by facilities management, lack of QC equipment and insufficient staff form the major challenges in setting up QC in the facilities under study. The responses on the frequencies at which QC tests should be conducted did not correspond to the recommended standards; indicating that personnel were not familiar with QC implementation and may require further training on QC.

  11. SAGA: A project to automate the management of software production systems

    NASA Technical Reports Server (NTRS)

    Campbell, R. H.

    1983-01-01

    The current work in progress for the SAGA project are described. The highlights of this research are: a parser independent SAGA editor, design for the screen editing facilities of the editor, delivery to NASA of release 1 of Olorin, the SAGA parser generator, personal workstation environment research, release 1 of the SAGA symbol table manager, delta generation in SAGA, requirements for a proof management system, documentation for and testing of the cyber pascal make prototype, a prototype cyber-based slicing facility, a June 1984 demonstration plan, SAGA utility programs, summary of UNIX software engineering support, and theorem prover review.

  12. Cryogenic ribbon-cutting

    NASA Image and Video Library

    2011-03-30

    NASA cut the ribbon on a new cryogenics control center at John C. Stennis Space Center on March 30. The new facility is part of a project to strengthen Stennis facilities to withstand the impacts of future storms like hurricane Katrina in 2005. Participants in the ribbon-cutting included (l to r): Jason Zuckerman, director of project management for The McDonnel Group; Keith Brock, director of the NASA Project Directorate at Stennis; Stennis Deputy Director Rick Gilbrech; Steve Jackson, outgoing program manager of the Jacobs Technology NASA Test Operations Group; and Troy Frisbie, Cryo Control Center Construction project manager for NASA Center Operations at Stennis.

  13. Preliminary enquiry into the availability, price and quality of malaria rapid diagnostic tests in the private health sector of six malaria-endemic countries.

    PubMed

    Albertini, A; Djalle, D; Faye, B; Gamboa, D; Luchavez, J; Mationg, M L; Mwangoka, G; Oyibo, W; Bennett, J; Incardona, S; Lee, E

    2012-02-01

    This enquiry aimed to provide a snap-shot of availability, price and quality of malaria rapid diagnostic tests (RDTs) in private health facilities at selected sites in six malaria-endemic countries in Africa, South East Asia and South America. In each study site, data collectors surveyed private healthcare facilities which were selected based on accessibility from their home institution. Using a questionnaire, information was recorded about the facility itself and the malaria RDT(s) available. Where possible, a small number of RDTs were procured and quality control tested using a standardized procedure. Of the 324 private healthcare facilities visited, 35 outlets (mainly private clinics and hospitals) were found to supply 10 different types of RDTs products. RDT prices across the six countries ranged from US$1.00 to $16.81. Five of the 14 malaria RDTs collected failed quality control testing. In the private outlets sampled, the availability of RDTs was limited. Some of the RDTs whose quality we tested demonstrated inadequate sensitivity. This presents a number of risks. Given the more widespread distribution of antimalarials currently planned for private sector facilities, parasite-based diagnosis in this sector will be essential to adhere to the WHO guidelines for effective case management of malaria. Considerable regulation and quality control are also necessary to assure the availability of accurate and reliable RDTs, as well as adequate case management and provider adherence to RDT results. Public sector engagement is likely to be essential in this process. © 2011 Blackwell Publishing Ltd.

  14. Laboratory Resources Management in Manufacturing Systems Programs

    ERIC Educational Resources Information Center

    Obi, Samuel C.

    2004-01-01

    Most, if not all, industrial technology (IT) programs have laboratories or workshops. Often equipped with modern equipment, tools, materials, and measurement and test instruments, these facilities constitute a major investment for IT programs. Improper use or over use of program facilities may result in dirty lab equipment, lost or damaged tools,…

  15. Fever case management at private health facilities and private pharmacies on the Kenyan coast: analysis of data from two rounds of client exit interviews and mystery client visits.

    PubMed

    Poyer, Stephen; Musuva, Anne; Njoki, Nancy; Okara, Robi; Cutherell, Andrea; Sievers, Dana; Lussiana, Cristina; Memusi, Dorothy; Kiptui, Rebecca; Ejersa, Waqo; Dolan, Stephanie; Charman, Nicole

    2018-03-13

    Private sector availability and use of malaria rapid diagnostic tests (RDTs) lags behind the public sector in Kenya. Increasing channels through which quality malaria diagnostic services are available can improve access to testing and help meet the target of universal diagnostic testing. Registered pharmacies are currently not permitted to perform blood tests, and evidence of whether malaria RDTs can be used by non-laboratory private providers in line with the national malaria control guidelines is required to inform ongoing policy discussions in Kenya. Two rounds of descriptive cross-sectional exit interviews and mystery client surveys were conducted at private health facilities and registered pharmacies in 2014 and 2015, 6 and 18 months into a multi-country project to prime the private sector market for the introduction of RDTs. Data were collected on reported RDT use, medicines received and prescribed, and case management of malaria test-negative mystery clients. Analysis compared outcomes at facilities and pharmacies independently for the two survey rounds. Across two rounds, 534 and 633 clients (including patients) from 130 and 120 outlets were interviewed, and 214 and 250 mystery client visits were completed. Reported testing by any malaria diagnostic test was higher in private health facilities than registered pharmacies in both rounds (2014: 85.6% vs. 60.8%, p < 0.001; 2015: 85.3% vs. 56.3%, p < 0.001). In registered pharmacies, testing by RDT was 52.1% in 2014 and 56.3% in 2015. At least 75% of test-positive patients received artemisinin-based combination therapy (ACT) in both rounds, with no significant difference between outlet types in either round. Provision of any anti-malarial for test-negative patients ranged from 0 to 13.9% across outlet types and rounds. In 2015, mystery clients received the correct (negative) diagnosis and did not receive an anti-malarial in 75.5% of visits to private health facilities and in 78.4% of visits to registered pharmacies. Non-laboratory staff working in registered pharmacies in Kenya can follow national guidelines for diagnosis with RDTs when provided with the same level of training and supervision as private health facility staff. Performance and compliance to treatment recommendations are comparable to diagnostic testing outcomes recorded in private health facilities.

  16. KSC facilities status and planned management operations. [for Shuttle launches

    NASA Technical Reports Server (NTRS)

    Gray, R. H.; Omalley, T. J.

    1979-01-01

    A status report is presented on facilities and planned operations at the Kennedy Space Center with reference to Space Shuttle launch activities. The facilities are essentially complete, with all new construction and modifications to existing buildings almost finished. Some activity is still in progress at Pad A and on the Mobile Launcher due to changes in requirements but is not expected to affect the launch schedule. The installation and testing of the ground checkout equipment that will be used to test the flight hardware is now in operation. The Launch Processing System is currently supporting the development of the applications software that will perform the testing of this flight hardware.

  17. Stennis cuts ribbon on records retention facility

    NASA Image and Video Library

    2010-08-24

    NASA's John C. Stennis Space Center cut the ribbon Aug. 24 on a new, storm-resistant Records Retention Facility that consolidates and protects records storage at the nation's premier rocket engine test facility. This facility will also house history office operations. Participants in the ribbon-cutting included: (l to r) Gay Irby, Center Operations deputy director at Stennis; Linda Cureton, NASA chief information officer; Patrick Scheuermann, Stennis director; Jane Odom, NASA chief archivist; Dinna Cottrell, Stennis chief information officer; and James Cluff, Stennis records manager.

  18. 43 CFR 3271.14 - What do I need to do to start building and testing a utilization facility if it is not located on...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false What do I need to do to start building and testing a utilization facility if it is not located on Federal lands leased for geothermal resources? 3271.14 Section 3271.14 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE...

  19. 43 CFR 3271.14 - What do I need to do to start building and testing a utilization facility if it is not located on...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false What do I need to do to start building and testing a utilization facility if it is not located on Federal lands leased for geothermal resources? 3271.14 Section 3271.14 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE...

  20. 43 CFR 3271.14 - What do I need to do to start building and testing a utilization facility if it is not located on...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false What do I need to do to start building and testing a utilization facility if it is not located on Federal lands leased for geothermal resources? 3271.14 Section 3271.14 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE...

  1. 43 CFR 3271.14 - What do I need to do to start building and testing a utilization facility if it is not located on...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false What do I need to do to start building and testing a utilization facility if it is not located on Federal lands leased for geothermal resources? 3271.14 Section 3271.14 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE...

  2. Considerations for setting up an order entry system for nuclear medicine tests.

    PubMed

    Hara, Narihiro; Onoguchi, Masahisa; Nishida, Toshihiko; Honda, Minoru; Houjou, Osamu; Yuhi, Masaru; Takayama, Teruhiko; Ueda, Jun

    2007-12-01

    Integrating the Healthcare Enterprise-Japan (IHE-J) was established in Japan in 2001 and has been working to standardize health information and make it accessible on the basis of the fundamental Integrating Healthcare Enterprise (IHE) specifications. However, because specialized operations are used in nuclear medicine tests, online sharing of patient information and test order information from the order entry system as shown by the scheduled workflow (SWF) is difficult, making information inconsistent throughout the facility and uniform management of patient information impossible. Therefore, we examined the basic design (subsystem design) for order entry systems, which are considered an important aspect of information management for nuclear medicine tests and needs to be consistent with the system used throughout the rest of the facility. There are many items that are required by the subsystem when setting up an order entry system for nuclear medicine tests. Among these items, those that are the most important in the order entry system are constructed using exclusion settings, because of differences in the conditions for using radiopharmaceuticals and contrast agents and appointment frame settings for differences in the imaging method and test items. To establish uniform management of patient information for nuclear medicine tests throughout the facility, it is necessary to develop an order entry system with exclusion settings and appointment frames as standard features. Thereby, integration of health information with the Radiology Information System (RIS) or Picture Archiving Communication System (PACS) based on Digital Imaging Communications in Medicine (DICOM) standards and real-time health care assistance can be attained, achieving the IHE agenda of improving health care service and efficiently sharing information.

  3. Health systems readiness and management of febrile outpatients under low malaria transmission in Vanuatu.

    PubMed

    Zurovac, Dejan; Guintran, Jean-Olivier; Donald, Wesley; Naket, Esau; Malinga, Josephine; Taleo, George

    2015-12-02

    Vanuatu, an archipelago country in Western Pacific harbouring low Plasmodium falciparum and Plasmodium vivax malaria transmission, has been implementing a malaria case management policy, recommending parasitological testing of patients with fever and anti-malarial treatment for test-positive only patients. A health facility survey to evaluate the health systems readiness to implement the policy and the quality of outpatient management for patients with fever was undertaken. A cross-sectional, cluster sample survey, using a range of quality-of-care methods, included all health centres and hospitals in Vanuatu. The main outcome measures were coverage of health facilities and health workers with commodities and support interventions, adherence to test and treatment recommendations, and factors influencing malaria testing. The survey was undertaken in 2014 during the low malaria season and included 41 health facilities, 67 health workers and 226 outpatient consultations for patients with fever. All facilities had capacity for parasitological diagnosis, 95.1 % stocked artemether-lumefantrine and 63.6 % primaquine. The coverage of health workers with support interventions ranged from 50 to 70 %. Health workers' knowledge was high only regarding treatment policy for uncomplicated P. falciparum malaria (83.4 %). History taking and clinical examination practices were sub-optimal. Some 35.0 % (95 % CI 23.4-48.6) of patients with fever were tested for malaria, of which all results were negative and only one patient received anti-malarial treatment. Testing was significantly higher for patients age 5 years and older (OR = 2.33; 95 % CI 1.48-5.02), seen by less qualified health workers (OR = 2.73; 95 % CI 1.48-5.02), health workers who received malaria case management training (OR = 2.39; 95 % CI 1.28-4.47) and patients with increased temperature (OR = 2.56; 95 % CI 1.17-5.57), main complaint of fever (OR = 5.82; 95 % CI 1.26-26.87) and without runny nose (OR = 3.75; 95 % CI 1.36-10.34). Antibiotic use was very high (77.4 %) with sub-optimal dispensing and counselling practices. Health facility and health worker readiness to implement policy is higher for falciparum than vivax malaria. Clinical and malaria testing practices are sub-optimal, however adherence to test negative results is nearly universal. Use of antibiotics is irrational. Quantitative and qualitative improvements of ongoing interventions are needed to re-inforce clinical practices in this area characterized by difficult access, human resource shortages but aspiring towards malaria elimination.

  4. An SSH key management system: easing the pain of managing key/user/account associations

    NASA Astrophysics Data System (ADS)

    Arkhipkin, D.; Betts, W.; Lauret, J.; Shiryaev, A.

    2008-07-01

    Cyber security requirements for secure access to computing facilities often call for access controls via gatekeepers and the use of two-factor authentication. Using SSH keys to satisfy the two factor authentication requirement has introduced a potentially challenging task of managing the keys and their associations with individual users and user accounts. Approaches for a facility with the simple model of one remote user corresponding to one local user would not work at facilities that require a many-to-many mapping between users and accounts on multiple systems. We will present an SSH key management system we developed, tested and deployed to address the many-to-many dilemma in the environment of the STAR experiment. We will explain its use in an online computing context and explain how it makes possible the management and tracing of group account access spread over many sub-system components (data acquisition, slow controls, trigger, detector instrumentation, etc.) without the use of shared passwords for remote logins.

  5. 42 CFR 410.33 - Independent diagnostic testing facility.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... problem and who uses the results in the management of the beneficiary's specific medical problem... the results in the management of the beneficiary's specific medical problem. Nonphysician... SERVICES MEDICARE PROGRAM SUPPLEMENTARY MEDICAL INSURANCE (SMI) BENEFITS Medical and Other Health Services...

  6. 78 FR 58449 - Generator Requirements at the Transmission Interface

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-24

    ... Connection Requirements), FAC-003-3 (Transmission Vegetation Management), PRC-004- 2.1a (Analysis and... and Generation Protection System Maintenance and Testing). The modifications improve reliability... Standards FAC-001-1 (Facility Connection Requirements), FAC-003-3 (Transmission Vegetation Management), PRC...

  7. STORMWATER BEST MANAGEMENT PRACTICES TEST FACILITY - SWALES

    EPA Science Inventory

    The NRMRL swale evaluation is part of a larger collection of long-term research projects that evaluates many Best Management Practices. EPA has ongoing research examining the performance of constructed wet lands, and detention and retention ponds. Other projects will evaluate ra...

  8. KSC-2014-2645

    NASA Image and Video Library

    2014-05-21

    CAPE CANAVERAL, Fla. – From left behind the reporter in the white shirt, Chirold Epp, the Autonomous Landing and Hazard Avoidance Technology, or ALHAT, project manager, Jon Olansen, Morpheus project manager, and Greg Gaddis, Morpheus/ALHAT site director, speak to members of the media near the north end of the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida. Media also viewed Morpheus inside a facility near the landing facility. Project Morpheus tests NASA’s ALHAT and an engine that runs on liquid oxygen and methane, which are green propellants. These new capabilities could be used in future efforts to deliver cargo to planetary surfaces. The landing facility provides the lander with the kind of field necessary for realistic testing, complete with rocks, craters and hazards to avoid. Morpheus’ ALHAT payload allows it to navigate to clear landing sites amidst rocks, craters and other hazards during its descent. Project Morpheus is being managed under the Advanced Exploration Systems, or AES, Division in NASA’s Human Exploration and Operations Mission Directorate. The efforts in AES pioneer new approaches for rapidly developing prototype systems, demonstrating key capabilities and validating operational concepts for future human missions beyond Earth orbit. For more information on Project Morpheus, visit http://morpheuslander.jsc.nasa.gov/. Photo credit: NASA/Frankie Martin

  9. Radioactive Waste Management and Nuclear Facility Decommissioning Progress in Iraq - 13216

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Al-Musawi, Fouad; Shamsaldin, Emad S.; Jasim, Hadi

    2013-07-01

    Management of Iraq's radioactive wastes and decommissioning of Iraq's former nuclear facilities are the responsibility of Iraq's Ministry of Science and Technology (MoST). The majority of Iraq's former nuclear facilities are in the Al-Tuwaitha Nuclear Research Center located a few kilometers from the edge of Baghdad. These facilities include bombed and partially destroyed research reactors, a fuel fabrication facility and radioisotope production facilities. Within these facilities are large numbers of silos, approximately 30 process or waste storage tanks and thousands of drums of uncharacterised radioactive waste. There are also former nuclear facilities/sites that are outside of Al-Tuwaitha and these includemore » the former uranium processing and waste storage facility at Jesira, the dump site near Adaya, the former centrifuge facility at Rashdiya and the former enrichment plant at Tarmiya. In 2005, Iraq lacked the infrastructure needed to decommission its nuclear facilities and manage its radioactive wastes. The lack of infrastructure included: (1) the lack of an organization responsible for decommissioning and radioactive waste management, (2) the lack of a storage facility for radioactive wastes, (3) the lack of professionals with experience in decommissioning and modern waste management practices, (4) the lack of laws and regulations governing decommissioning or radioactive waste management, (5) ongoing security concerns, and (6) limited availability of electricity and internet. Since its creation eight years ago, the MoST has worked with the international community and developed an organizational structure, trained staff, and made great progress in managing radioactive wastes and decommissioning Iraq's former nuclear facilities. This progress has been made, despite the very difficult implementing conditions in Iraq. Within MoST, the Radioactive Waste Treatment and Management Directorate (RWTMD) is responsible for waste management and the Iraqi Decommissioning Directorate (IDD) is responsible for decommissioning activities. The IDD and the RWTMD work together on decommissioning projects. The IDD has developed plans and has completed decommissioning of the GeoPilot Facility in Baghdad and the Active Metallurgical Testing Laboratory (LAMA) in Al-Tuwaitha. Given this experience, the IDD has initiated work on more dangerous facilities. Plans are being developed to characterize, decontaminate and decommission the Tamuz II Research Reactor. The Tammuz Reactor was destroyed by an Israeli air-strike in 1981 and the Tammuz II Reactor was destroyed during the First Gulf War in 1991. In addition to being responsible for managing the decommissioning wastes, the RWTMD is responsible for more than 950 disused sealed radioactive sources, contaminated debris from the first Gulf War and (approximately 900 tons) of naturally-occurring radioactive materials wastes from oil production in Iraq. The RWTMD has trained staff, rehabilitated the Building 39 Radioactive Waste Storage building, rehabilitated portions of the French-built Radioactive Waste Treatment Station, organized and secured thousands of drums of radioactive waste organized and secured the stores of disused sealed radioactive sources. Currently, the IDD and the RWTMD are finalizing plans for the decommissioning of the Tammuz II Research Reactor. (authors)« less

  10. Advanced Distributed Measurements and Data Processing at the Vibro-Acoustic Test Facility, GRC Space Power Facility, Sandusky, Ohio - an Architecture and an Example

    NASA Technical Reports Server (NTRS)

    Hill, Gerald M.; Evans, Richard K.

    2009-01-01

    A large-scale, distributed, high-speed data acquisition system (HSDAS) is currently being installed at the Space Power Facility (SPF) at NASA Glenn Research Center s Plum Brook Station in Sandusky, OH. This installation is being done as part of a facility construction project to add Vibro-acoustic Test Capabilities (VTC) to the current thermal-vacuum testing capability of SPF in support of the Orion Project s requirement for Space Environments Testing (SET). The HSDAS architecture is a modular design, which utilizes fully-remotely managed components, enables the system to support multiple test locations with a wide-range of measurement types and a very large system channel count. The architecture of the system is presented along with details on system scalability and measurement verification. In addition, the ability of the system to automate many of its processes such as measurement verification and measurement system analysis is also discussed.

  11. Financial arrangement selection for energy management projects

    NASA Astrophysics Data System (ADS)

    Woodroof, Eric Aubrey

    Scope and method of study. The purpose of this study was to develop a model (E-FUND) to help facility managers select financial arrangements for energy management projects (EMPs). The model was developed with the help of a panel of expert financiers. The panel also helped develop a list of key objectives critical to the decision process. The E-FUND model was tested by a population of facility managers in four case studies. Findings and conclusions. The results may indicate that having a high economic benefit (from an EMP) is not overwhelmingly important, when compared to other qualitative objectives. The results may also indicate that the true lease and performance contract may be the most applicable financial arrangements for EMPs.

  12. Malaria prevalence and treatment of febrile patients at health facilities and medicine retailers in Cameroon.

    PubMed

    Mangham, Lindsay J; Cundill, Bonnie; Achonduh, Olivia A; Ambebila, Joel N; Lele, Albertine K; Metoh, Theresia N; Ndive, Sarah N; Ndong, Ignatius C; Nguela, Rachel L; Nji, Akindeh M; Orang-Ojong, Barnabas; Wiseman, Virginia; Pamen-Ngako, Joelle; Mbacham, Wilfred F

    2012-03-01

    To investigate the quality of malaria case management in Cameroon 5 years after the adoption of artemisinin-based combination therapy (ACT). Treatment patterns were examined in different types of facility, and the factors associated with being prescribed or receiving an ACT were investigated. A cross-sectional cluster survey was conducted among individuals of all ages who left public and private health facilities and medicine retailers in Cameroon and who reported seeking treatment for a fever. Prevalence of malaria was determined by rapid diagnostic tests (RDTs) in consenting patients attending the facilities and medicine retailers. Among the patients, 73% were prescribed or received an antimalarial, and 51% were prescribed or received an ACT. Treatment provided to patients significantly differed by type of facility: 65% of patients at public facilities, 55% of patients at private facilities and 45% of patients at medicine retailers were prescribed or received an ACT (P = 0.023). The odds of a febrile patient being prescribed or receiving an ACT were significantly higher for patients who asked for an ACT (OR = 24.1, P < 0.001), were examined by the health worker (OR = 1.88, P = 0.021), had not previously sought an antimalarial for the illness (OR = 2.29, P = 0.001) and sought treatment at a public (OR = 3.55) or private facility (OR = 1.99, P = 0.003). Malaria was confirmed in 29% of patients and 70% of patients with a negative result were prescribed or received an antimalarial. Malaria case management could be improved. Symptomatic diagnosis is inefficient because two-thirds of febrile patients do not have malaria. Government plans to extend malaria testing should promote rational use of ACT; though, the introduction of rapid diagnostic testing needs to be accompanied by updated clinical guidelines that provide clear guidance for the treatment of patients with negative test results. © 2011 Blackwell Publishing Ltd.

  13. Direct observation of outpatient management of malaria in a rural Ghanaian district.

    PubMed

    Ameme, Donne Kofi; Afari, Edwin Andrews; Nyarko, Kofi Mensah; Malm, Keziah Laurencia; Sackey, Samuel; Wurapa, Fred

    2014-01-01

    In Ghana, malaria continues to top outpatient morbidities; accounting for about 40% of all attendances. Effective case-management is key to its control. We evaluated case-management practices of uncomplicated malaria in Kwahu South District (KSD) health facilities to determine their conformity to guidelines. We conducted a cross sectional survey at all public health facilities in three randomly selected sub-districts in KSD. A non-participatory observation of suspected malaria consultations was conducted. Suspected malaria was defined as any person with fever (by history or measured axillary temperature > or equal 37.5 oC) presenting at the selected health facilities between 19th and 29th April 2013. Findings were expressed as frequencies, relative frequencies, mean (± standard deviation) and median. Of 70 clinical observations involving 10 prescribers in six health facilities, 40 (57.1%) were females and 16 (22.9%) were below five years. Median age was 18 years (interquartile range: 5-33). Overall, 63 (90.0%) suspected case-patients had diagnostic tests. Two (3.6%) were treated presumptively. All 31 confirmed and 10 (33.3%) of the test negative case-patients received Artemisinin-based Combination Therapies (ACTs). However, only 12 (27.9%) of the 43 case-patients treated with ACT received Artesunate-Amodiaquine (AA). Only three (18.8%) of the under-fives were examined for non-malarial causes of fever. Mean number of drugs per patient was 3.7 drugs (± 1.1). Only 45 (64.3%) patients received at least one counseling message. Conformity of malaria case-management practices to guidelines in KSD was suboptimal. Apart from high rate of diagnostic testing and ACT use, prescription of AA, physical examination and counseling needed improvement.

  14. Final Environmental Assessment: Demolition of Barracks (Building T-2) at Ipswich Antenna Test Facility

    DTIC Science & Technology

    2011-12-01

    EIAP), managed the preparation and was the primary author of this environmental assessment. QAULITY ASSURANCE LEADER Cravedi, Gregory. 66 ABG/CE...BMP Best Management Practice CEQ Council on Environmental Quality CERCLA Comprehensive Environmental Response, Compensation, and Liability Act...Assessment EMCS Energy Management Control System ESC Electronic Systems Center FEMA Federal Emergency Management Agency FIRM Federal

  15. 26 CFR 1.148-7 - Spending exceptions to the rebate requirement.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... finance a new office building. A uses proceeds of the bonds to purchase materials to be used in... contributes its ratable share of the cost of building the new facility to the project manager for the facility... expectations test for future earnings. For purposes of determining compliance with the spending requirements as...

  16. 26 CFR 1.148-7 - Spending exceptions to the rebate requirement.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... finance a new office building. A uses proceeds of the bonds to purchase materials to be used in... contributes its ratable share of the cost of building the new facility to the project manager for the facility... expectations test for future earnings. For purposes of determining compliance with the spending requirements as...

  17. 26 CFR 1.148-7 - Spending exceptions to the rebate requirement.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... finance a new office building. A uses proceeds of the bonds to purchase materials to be used in... contributes its ratable share of the cost of building the new facility to the project manager for the facility... expectations test for future earnings. For purposes of determining compliance with the spending requirements as...

  18. 40 CFR 270.310 - What equipment information must I keep at my facility?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (e.g., identify the hazardous waste management unit on a facility plot plan). (3) Type of equipment... compliance test required by 40 CFR 264.1033(j). (3) A design analysis, specifications, drawings, schematics... acceptable to the Director that present basic control device design information. The design analysis must...

  19. The Dental Solid Waste Management in Different Categories of Dental Laboratories in Abha City, Saudi Arabia

    PubMed Central

    Haralur, Satheesh B.; Al-Qahtani, Ali S.; Al-Qarni, Marie M.; Al-Homrany, Rami M.; Aboalkhair, Ayyob E.; Madalakote, Sujatha S.

    2015-01-01

    Aim: To study the awareness, attitude, practice and facilities among the different categories of dental laboratories in Abha city. Materials and Methods: A total of 80 dental technicians were surveyed in the study. The dental laboratories included in the study were teaching institute (Group I), Government Hospital (Group II), Private Dental Clinic (Group III) and Independent laboratory (Group IV). The pre-tested anonymous questionnaire was used to understand knowledge, attitude, facilities, practice and orientation regarding biomedical waste management. Results: The knowledge of biomedical waste categories, colour coding and segregation was better among Group I (55-65%) and Group II (65-75%). The lowest standard of waste disposal was practiced at Group IV (15-20%) and Group III (25-35%). The availability of disposal facilities was poor at Group IV. The continuous education on biomedical waste management lacked in all the Groups. Conclusion: The significant improvement in disposal facilities was required at Group III and Group IV laboratories. All dental technicians were in need of regular training of biomedical waste management. Clinical Significance: The dental laboratories are an integral part of dental practice. The dental laboratories are actively involved in the generation, handling and disposal of biomedical waste. Hence, it is important to assess the biomedical waste management knowledge, attitude, facilities and practice among different categories of dental laboratories. PMID:26962373

  20. Liquid Methane Conditioning Capabilities Developed at the NASA Glenn Research Center's Small Multi- Purpose Research Facility (SMiRF) for Accelerated Lunar Surface Storage Thermal Testing

    NASA Technical Reports Server (NTRS)

    Bamberger, Helmut H.; Robinson, R. Craig; Jurns, John M.; Grasl, Steven J.

    2011-01-01

    Glenn Research Center s Creek Road Cryogenic Complex, Small Multi-Purpose Research Facility (SMiRF) recently completed validation / checkout testing of a new liquid methane delivery system and liquid methane (LCH4) conditioning system. Facility checkout validation was conducted in preparation for a series of passive thermal control technology tests planned at SMiRF in FY10 using a flight-like propellant tank at simulated thermal environments from 140 to 350K. These tests will validate models and provide high quality data to support consideration of LCH4/LO2 propellant combination option for a lunar or planetary ascent stage.An infrastructure has been put in place which will support testing of large amounts of liquid methane at SMiRF. Extensive modifications were made to the test facility s existing liquid hydrogen system for compatibility with liquid methane. Also, a new liquid methane fluid conditioning system will enable liquid methane to be quickly densified (sub-cooled below normal boiling point) and to be quickly reheated to saturation conditions between 92 and 140 K. Fluid temperatures can be quickly adjusted to compress the overall test duration. A detailed trade study was conducted to determine an appropriate technique to liquid conditioning with regard to the SMiRF facility s existing infrastructure. In addition, a completely new roadable dewar has been procured for transportation and temporary storage of liquid methane. A new spherical, flight-representative tank has also been fabricated for integration into the vacuum chamber at SMiRF. The addition of this system to SMiRF marks the first time a large-scale liquid methane propellant test capability has been realized at Glenn.This work supports the Cryogenic Fluid Management Project being conducted under the auspices of the Exploration Technology Development Program, providing focused cryogenic fluid management technology efforts to support NASA s future robotic or human exploration missions.

  1. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Piette, Mary Ann; Sezgen, Osman; Watson, David S.

    This report describes the results of a research project to develop and evaluate the performance of new Automated Demand Response (Auto-DR) hardware and software technology in large facilities. Demand Response (DR) is a set of activities to reduce or shift electricity use to improve electric grid reliability, manage electricity costs, and ensure that customers receive signals that encourage load reduction during times when the electric grid is near its capacity. The two main drivers for widespread demand responsiveness are the prevention of future electricity crises and the reduction of electricity prices. Additional goals for price responsiveness include equity through costmore » of service pricing, and customer control of electricity usage and bills. The technology developed and evaluated in this report could be used to support numerous forms of DR programs and tariffs. For the purpose of this report, we have defined three levels of Demand Response automation. Manual Demand Response involves manually turning off lights or equipment; this can be a labor-intensive approach. Semi-Automated Response involves the use of building energy management control systems for load shedding, where a preprogrammed load shedding strategy is initiated by facilities staff. Fully-Automated Demand Response is initiated at a building or facility through receipt of an external communications signal--facility staff set up a pre-programmed load shedding strategy which is automatically initiated by the system without the need for human intervention. We have defined this approach to be Auto-DR. An important concept in Auto-DR is that a facility manager is able to ''opt out'' or ''override'' an individual DR event if it occurs at a time when the reduction in end-use services is not desirable. This project sought to improve the feasibility and nature of Auto-DR strategies in large facilities. The research focused on technology development, testing, characterization, and evaluation relating to Auto-DR. This evaluation also included the related decisionmaking perspectives of the facility owners and managers. Another goal of this project was to develop and test a real-time signal for automated demand response that provided a common communication infrastructure for diverse facilities. The six facilities recruited for this project were selected from the facilities that received CEC funds for new DR technology during California's 2000-2001 electricity crises (AB970 and SB-5X).« less

  2. Waste management facility accident analysis (WASTE ACC) system: software for analysis of waste management alternatives

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kohout, E.F.; Folga, S.; Mueller, C.

    1996-03-01

    This paper describes the Waste Management Facility Accident Analysis (WASTE{underscore}ACC) software, which was developed at Argonne National Laboratory (ANL) to support the US Department of Energy`s (DOE`s) Waste Management (WM) Programmatic Environmental Impact Statement (PEIS). WASTE{underscore}ACC is a decision support and database system that is compatible with Microsoft{reg_sign} Windows{trademark}. It assesses potential atmospheric releases from accidents at waste management facilities. The software provides the user with an easy-to-use tool to determine the risk-dominant accident sequences for the many possible combinations of process technologies, waste and facility types, and alternative cases described in the WM PEIS. In addition, its structure willmore » allow additional alternative cases and assumptions to be tested as part of the future DOE programmatic decision-making process. The WASTE{underscore}ACC system demonstrates one approach to performing a generic, systemwide evaluation of accident risks at waste management facilities. The advantages of WASTE{underscore}ACC are threefold. First, the software gets waste volume and radiological profile data that were used to perform other WM PEIS-related analyses directly from the WASTE{underscore}MGMT system. Second, the system allows for a consistent analysis across all sites and waste streams, which enables decision makers to understand more fully the trade-offs among various policy options and scenarios. Third, the system is easy to operate; even complex scenario runs are completed within minutes.« less

  3. Evaluation of case management of uncomplicated malaria in Haiti: a national health facility survey, 2012.

    PubMed

    Landman, Keren Z; Jean, Samuel E; Existe, Alexandre; Akom, Eniko E; Chang, Michelle A; Lemoine, Jean Frantz; Mace, Kimberly E

    2015-10-09

    Malaria is a public health concern in Haiti, although there are limited data on its burden and case management. National malaria guidelines updated in 2012 recommend treatment with chloroquine and primaquine. In December 2012, a nationally-representative cross-sectional survey of health facilities (HFs) was conducted to determine malaria prevalence among febrile outpatients and malaria case management quality at baseline before scale-up of diagnostics and case management training. Among all 833 HFs nationwide, 30 were selected randomly, in proportion to total HFs per region, for 2-day evaluations. Survey teams inventoried HF material and human resources. Outpatients of all ages were screened for temperature >37.5 °C or history of fever; those without severe symptoms were consented and enrolled. Providers evaluated and treated enrolled patients according to HF standards; the survey teams documented provider-ordered diagnostic tests and treatment decisions. Facility-based test results [microscopy and malaria rapid diagnostic tests (RDTs)] were collected from HF laboratories. Blood smears for gold-standard microscopy, and dried blood spots for polymerase chain reaction (PCR) were obtained. Malaria diagnostic capacity, defined as completing a test for an enrolled patient or having adequate resources for RDTs or microscopy, was present in 11 (37 %) HFs. Among 459 outpatients screened, 257 (56 %) were febrile, of which 193 (75 %) were eligible, and 153 (80 %) were enrolled. Among 39 patients with facility-level malaria test results available on the survey day, 11 (28 %) were positive, of whom 6 (55 %) were treated with an anti-malarial. Twenty-seven (95 %) of the 28 patients testing negative were not treated with an anti-malarial. Of 114 patients without test results available, 35 (31 %) were presumptively treated for malaria. Altogether, 42 patients were treated with an anti-malarial, one (2 %) according to Haiti's 2012 guidelines. Of 140 gold-standard smears, none were positive, although one patient tested positive by PCR, a more sensitive technique. The national prevalence of malaria among febrile outpatients is estimated to be 0.5 % (95 % confidence interval 0-1.7 %). Malaria is an uncommon cause of fever in Haitian outpatients, and limited, often inaccurate, diagnostic capacity at baseline contributes to over diagnosis. Scale-up of diagnostics and training on new guidelines should improve malaria diagnosis and treatment in Haiti.

  4. An Architecture for Intelligent Systems Based on Smart Sensors

    NASA Technical Reports Server (NTRS)

    Schmalzel, John; Figueroa, Fernando; Morris, Jon; Mandayam, Shreekanth; Polikar, Robi

    2004-01-01

    Based on requirements for a next-generation rocket test facility, elements of a prototype Intelligent Rocket Test Facility (IRTF) have been implemented. A key component is distributed smart sensor elements integrated using a knowledgeware environment. One of the specific goals is to imbue sensors with the intelligence needed to perform self diagnosis of health and to participate in a hierarchy of health determination at sensor, process, and system levels. The preliminary results provide the basis for future advanced development and validation using rocket test stand facilities at Stennis Space Center (SSC). We have identified issues important to further development of health-enabled networks, which should be of interest to others working with smart sensors and intelligent health management systems.

  5. Assessment of facility readiness and provider preparedness for dealing with postpartum haemorrhage and pre-eclampsia/eclampsia in public and private health facilities of northern Karnataka, India: a cross-sectional study.

    PubMed

    Jayanna, Krishnamurthy; Mony, Prem; B M, Ramesh; Thomas, Annamma; Gaikwad, Ajay; H L, Mohan; Blanchard, James F; Moses, Stephen; Avery, Lisa

    2014-09-04

    The maternal mortality ratio in India has been declining over the past decade, but remains unacceptably high at 212 per 100,000 live births. Postpartum haemorrhage (PPH) and pre- eclampsia/eclampsia contribute to 40% of all maternal deaths. We assessed facility readiness and provider preparedness to deal with these two maternal complications in public and private health facilities of northern Karnataka state, south India. We undertook a cross-sectional study of 131 primary health centres (PHCs) and 148 higher referral facilities (74 public and 74 private) in eight districts of the region. Facility infrastructure and providers' knowledge related to screening and management of complications were assessed using facility checklists and test cases, respectively. We also attempted an audit of case sheets to assess provider practice in the management of complications. Chi square tests were used for comparing proportions. 84.5% and 62.9% of all facilities had atleast one doctor and three nurses, respectively; only 13% of higher facilities had specialists. Magnesium sulphate, the drug of choice to control convulsions in eclampsia was available in 18% of PHCs, 48% of higher public facilities and 70% of private facilities. In response to the test case on eclampsia, 54.1% and 65.1% of providers would administer anti-hypertensives and magnesium sulphate, respectively; 24% would administer oxygen and only 18% would monitor for magnesium sulphate toxicity. For the test case on PPH, only 37.7% of the providers would assess for uterine tone, and 40% correctly defined early PPH. Specialists were better informed than the other cadres, and the differences were statistically significant. We experienced generally poor response rates for audits due to non-availability and non-maintenance of case sheets. Addressing gaps in facility readiness and provider competencies for emergency obstetric care, alongside improving coverage of institutional deliveries, is critical to improve maternal outcomes. It is necessary to strengthen providers' clinical and problem solving skills through capacity building initiatives beyond pre-service training, such as through onsite mentoring and supportive supervision programs. This should be backed by a health systems response to streamline staffing and supply chains in order to improve the quality of emergency obstetric care.

  6. Embracing Safe Ground Test Facility Operations and Maintenance

    NASA Technical Reports Server (NTRS)

    Dunn, Steven C.; Green, Donald R.

    2010-01-01

    Conducting integrated operations and maintenance in wind tunnel ground test facilities requires a balance of meeting due dates, efficient operation, responsiveness to the test customer, data quality, effective maintenance (relating to readiness and reliability), and personnel and facility safety. Safety is non-negotiable, so the balance must be an "and" with other requirements and needs. Pressure to deliver services faster at increasing levels of quality in under-maintained facilities is typical. A challenge for management is to balance the "need for speed" with safety and quality. It s especially important to communicate this balance across the organization - workers, with a desire to perform, can be tempted to cut corners on defined processes to increase speed. Having a lean staff can extend the time required for pre-test preparations, so providing a safe work environment for facility personnel and providing good stewardship for expensive National capabilities can be put at risk by one well-intending person using at-risk behavior. This paper documents a specific, though typical, operational environment and cites management and worker safety initiatives and tools used to provide a safe work environment. Results are presented and clearly show that the work environment is a relatively safe one, though still not good enough to keep from preventing injury. So, the journey to a zero injury work environment - both in measured reality and in the minds of each employee - continues. The intent of this paper is to provide a benchmark for others with operational environments and stimulate additional sharing and discussion on having and keeping a safe work environment.

  7. Bethany Sparn | NREL

    Science.gov Websites

    Sparn Photo of Bethany Sparn Bethany Sparn Researcher IV-Systems Engineering Bethany.Sparn@nrel.gov , residential HVAC equipment, heat pump water heaters, automated home energy management devices, and whole-house Energy Systems Integration Facility which provides a test bed for evaluating home energy management

  8. "Mobile technology to improve heart failure outcomes: A proof of concept paper".

    PubMed

    Athilingam, Ponrathi; Jenkins, Bradlee A; Zumpano, Heather; Labrador, Miguel A

    2018-02-01

    Heart failure (HF) causes significant symptom burden and human suffering with considerable economic burden due to hospital readmissions. Targeted interventions to encourage and support self-management behavior is warranted. To test the proof of concept of a mobile application (HeartMapp) in improving self-care management of patients with heart failure. An exploratory inquiry used a field study strategy with purposeful sampling and constant comparative analysis to test the proof of concept of HeartMapp using The Business Model Canvas framework. A total of 125 individuals, who were identified as potential candidates to use the HeartMapp completed the interview over a seven-week period in 2016. Constant comparative analysis indicated themes that Skilled Nursing Facilities had increased readmissions. Participants from Skilled Nursing Facilities reported concern on lack of staffing, star rating, and malpractice claims. Two types of patients were identified as early adapters of technology and those in denial. Health care facilities reported challenges on transitional care, nurses struggle with engagement of patients on self-care management. To avoid readmission penalty, hospitals task home care agencies to keep the patients home for 30-days. While home care agencies rely on remote telemonitoring reported that current telemonitoring devices are costly to maintain, thus exploring novel technology. The Business Model Canvas provided directions for future testing of HeartMapp for its usability as an adjunct device in home health setting to improve self-management and enhance communication with providers, and ultimately reduce readmissions. Copyright © 2017 Elsevier Inc. All rights reserved.

  9. Monitoring and Testing the Parts Cleaning Stations, Abrasive Blasting Cabinets, and Paint Booths

    NASA Technical Reports Server (NTRS)

    Jordan, Tracee M.

    2004-01-01

    I have the opportunity to work in the Environmental Management Office (EMO) this summer. One of the EMO's tasks is to make sure the Environmental Management System is implemented to the entire Glenn Research Center (GRC). The Environmental Management System (EMS) is a policy or plan that is oriented toward minimizing an organization's impact to the environment. Our EMS includes the reduction of solid waste regeneration and the reduction of hazardous material use, waste, and pollution. With the Waste Management Team's (WMT) help, the EMS can be implemented throughout the NASA Glenn Research Center. The WMT is responsible for the disposal and managing of waste throughout the GRC. They are also responsible for the management of all chemical waste in the facility. My responsibility is to support the waste management team by performing an inventory on parts cleaning stations, abrasive cabinets, and paint booths through out the entire facility. These booths/stations are used throughout the center and they need to be monitored and tested for hazardous waste and material. My job is to visit each of these booths/stations, take samples of the waste, and analyze the samples.

  10. Malaria diagnostic capacity in health facilities in Ethiopia

    PubMed Central

    2014-01-01

    Background Accurate early diagnosis and prompt treatment is one of the key strategies to control and prevent malaria in Ethiopia where both Plasmodium falciparum and Plasmodium vivax are sympatric and require different treatment regimens. Microscopy is the standard for malaria diagnosis at the health centres and hospitals whereas rapid diagnostic tests are used at community-level health posts. The current study was designed to assess malaria microscopy capacity of health facilities in Oromia Regional State and Dire Dawa Administrative City, Ethiopia. Methods A descriptive cross-sectional study was conducted from February to April 2011 in 122 health facilities, where health professionals were interviewed using a pre-tested, standardized assessment tool and facilities’ laboratory practices were assessed by direct observation. Results Of the 122 assessed facilities, 104 (85%) were health centres and 18 (15%) were hospitals. Out of 94 health facilities reportedly performing blood films, only 34 (36%) used both thin and thick smears for malaria diagnosis. The quality of stained slides was graded in 66 health facilities as excellent, good and poor quality in 11(17%), 31 (47%) and 24 (36%) respectively. Quality assurance guidelines and malaria microscopy standard operating procedures were found in only 13 (11%) facilities and 12 (10%) had involved in external quality assessment activities, and 32 (26%) had supportive supervision within six months of the survey. Only seven (6%) facilities reported at least one staff’s participation in malaria microscopy refresher training during the previous 12 months. Although most facilities, 96 (79%), had binocular microscopes, only eight (7%) had the necessary reagents and supplies to perform malaria microscopy. Treatment guidelines for malaria were available in only 38 (31%) of the surveyed facilities. Febrile patients with negative malaria laboratory test results were managed with artemether-lumefantrine or chloroquine in 51% (53/104) of assessed health facilities. Conclusions The current study indicated that most of the health facilities had basic infrastructure and equipment to perform malaria laboratory diagnosis but with significant gaps in continuous laboratory supplies and reagents, and lack of training and supportive supervision. Overcoming these gaps will be critical to ensure that malaria laboratory diagnosis is of high-quality for better patient management. PMID:25073561

  11. Contamination Sources Effects Analysis (CSEA) - A Tool to Balance Cost/Schedule While Managing Facility Availability

    NASA Technical Reports Server (NTRS)

    Wilcox, Margaret

    2008-01-01

    A CSEA is similar to a Failure Modes Effects Analysis (FMEA). A CSEA tracks risk, deterrence, and occurrence of sources of contamination and their mitigation plans. Documentation is provided spanning mechanical and electrical assembly, precision cleaning, thermal vacuum bake-out, and thermal vacuum testing. These facilities all may play a role in contamination budgeting and reduction ultimately affecting test and flight. With a CSEA, visibility can be given to availability of these facilities, test sequencing and trade-offs. A cross-functional team including specialty engineering, contamination control, electrostatic dissipation, manufacturing, testing, and material engineering participate in an exercise that identifies contaminants and minimizes the complexity of scheduling these facilities considering their volatile schedules. Care can be taken in an efficient manner to insure correct cleaning processes are employed. The result is reduction in cycle time ("schedule hits"), reduced cost due to rework, reduced risk and improved communication and quality while achieving adherence to the Contamination Control Plan.

  12. DESCRIPTION OF RISK REDUCTION ENGINEERING LABORATORY TEST AND EVALUATION FACILITIES

    EPA Science Inventory

    An onsite team of multidisciplined engineers and scientists conduct research and provide technical services in the areas of testing, design, and field implementation for both solid and hazardous waste management. Engineering services focus on the design and implementation of...

  13. Potential utilization of the NASA/George C. Marshall Space Flight Center in earthquake engineering research

    NASA Technical Reports Server (NTRS)

    Scholl, R. E. (Editor)

    1979-01-01

    Earthquake engineering research capabilities of the National Aeronautics and Space Administration (NASA) facilities at George C. Marshall Space Flight Center (MSFC), Alabama, were evaluated. The results indicate that the NASA/MSFC facilities and supporting capabilities offer unique opportunities for conducting earthquake engineering research. Specific features that are particularly attractive for large scale static and dynamic testing of natural and man-made structures include the following: large physical dimensions of buildings and test bays; high loading capacity; wide range and large number of test equipment and instrumentation devices; multichannel data acquisition and processing systems; technical expertise for conducting large-scale static and dynamic testing; sophisticated techniques for systems dynamics analysis, simulation, and control; and capability for managing large-size and technologically complex programs. Potential uses of the facilities for near and long term test programs to supplement current earthquake research activities are suggested.

  14. Fluids and Combustion Facility: Fluids Integrated Rack Modal Model Correlation

    NASA Technical Reports Server (NTRS)

    McNelis, Mark E.; Suarez, Vicente J.; Sullivan, Timothy L.; Otten, Kim D.; Akers, James C.

    2005-01-01

    The Fluids Integrated Rack (FIR) is one of two racks in the Fluids and Combustion Facility on the International Space Station. The FIR is dedicated to the scientific investigation of space system fluids management supporting NASA s Exploration of Space Initiative. The FIR hardware was modal tested and FIR finite element model updated to satisfy the International Space Station model correlation criteria. The final cross-orthogonality results between the correlated model and test mode shapes was greater than 90 percent for all primary target modes.

  15. Planning and managing future space facility projects. [management by objectives and group dynamics

    NASA Technical Reports Server (NTRS)

    Sieber, J. E.; Wilhelm, J. A.; Tanner, T. A.; Helmreich, R. L.; Burgenbauch, S. F.

    1979-01-01

    To learn how ground-based personnel of a space project plan and organize their work and how such planning and organizing relate to work outcomes, longitudinal study of the management and execution of the Space Lab Mission Development Test 3 (SMD 3) was performed at NASA Ames Research Center. A view of the problems likely to arise in organizations and some methods of coping with these problems are presented as well as the conclusions and recommendations that pertain strictly to SMD 3 management. Emphasis is placed on the broader context of future space facility projects and additional problems that may be anticipated. A model of management that may be used to facilitate problem solving and communication - management by objectives (MBO) is presented. Some problems of communication and emotion management that MBO does not address directly are considered. Models for promoting mature, constructive and satisfying emotional relationships among group members are discussed.

  16. System configuration management plan for 101-SY Hydrogen Mitigation Test Project Mini-Data Acquisition and Control System of Tank Waste Remediation System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vargo, G.F. Jr.

    1994-10-11

    The DOE Standard defines the configuration management program by the five basic program elements of ``program management,`` ``design requirements,`` ``document control,`` ``change control,`` and ``assessments,`` and the two adjunct recovery programs of ``design reconstitution,`` and ``material condition and aging management. The C-M model of five elements and two adjunct programs strengthen the necessary technical and administrative control to establish and maintain a consistent technical relationship among the requirements, physical configuration, and documentation. Although the DOE Standard was originally developed for the operational phase of nuclear facilities, this plan has the flexibility to be adapted and applied to all life-cycle phasesmore » of both nuclear and non-nuclear facilities. The configuration management criteria presented in this plan endorses the DOE Standard and has been tailored specifically to address the technical relationship of requirements, physical configuration, and documentation during the full life-cycle of the 101-SY Hydrogen Mitigation Test Project Mini-Data Acquisition and Control System of Tank Waste Remediation System.« less

  17. Limited Effectiveness of a Skills and Drills Intervention to Improve Emergency Obstetric and Newborn Care in Karnataka, India: A Proof-of-Concept Study.

    PubMed

    Varghese, Beena; Krishnamurthy, Jayanna; Correia, Blaze; Panigrahi, Ruchika; Washington, Maryann; Ponnuswamy, Vinotha; Mony, Prem

    2016-12-23

    The majority of the maternal and perinatal deaths are preventable through improved emergency obstetric and newborn care at facilities. However, the quality of such care in India has significant gaps in terms of provider skills and in their preparedness to handle emergencies. We tested the feasibility, acceptability, and effectiveness of a "skills and drills" intervention, implemented between July 2013 and September 2014, to improve emergency obstetric and newborn care in the state of Karnataka, India. Emergency drills through role play, conducted every 2 months, combined with supportive supervision and a 2-day skills refresher session were delivered across 4 sub-district, secondary-level government facilities by an external team of obstetric and pediatric specialists and nurses. We evaluated the intervention through a quasi-experimental design with 4 intervention and 4 comparison facilities, using delivery case sheet reviews, pre- and post-knowledge tests among providers, objective structured clinical examinations (OSCEs), and qualitative in-depth interviews. Primary outcomes consisted of improved diagnosis and management of selected maternal and newborn complications (postpartum hemorrhage, pregnancy-induced hypertension, and birth asphyxia). Secondary outcomes included knowledge and skill levels of providers and acceptability and feasibility of the intervention. Knowledge scores among providers improved significantly in the intervention facilities; in obstetrics, average scores between the pre- and post-test increased from 49% to 57% (P=.006) and in newborn care, scores increased from 48% to 56% (P=.03). Knowledge scores in the comparison facilities were similar but did not improve significantly over time. Skill levels were significantly higher among providers in intervention facilities than comparison facilities (mean objective structured clinical examination scores for obstetric skills: 55% vs. 46%, respectively; for newborn skills: 58% vs. 48%, respectively; P<.001 for both obstetric and newborn), along with their confidence in managing complications. However, this did not result in significant differences in correct diagnosis and management of complications between intervention and comparison facilities. Shortage of trained nurses and doctors along with unavailability of a consistent supply chain was cited by most providers as major health systems barriers affecting provision of care. Improvements in knowledge, skills, and confidence levels of providers as a result of the skills and drills intervention was not sufficient to translate into improved diagnosis and management of maternal and newborn complications. System-level changes including adequate in-service training may also be necessary to improve maternal and newborn outcomes. © Varghese et al.

  18. Availability of essential health services in post-conflict Liberia.

    PubMed

    Kruk, Margaret E; Rockers, Peter C; Williams, Elizabeth H; Varpilah, S Tornorlah; Macauley, Rose; Saydee, Geetor; Galea, Sandro

    2010-07-01

    To assess the availability of essential health services in northern Liberia in 2008, five years after the end of the civil war. We carried out a population-based household survey in rural Nimba county and a health facility survey in clinics and hospitals nearest to study villages. We evaluated access to facilities that provide index essential services: artemisinin combination therapy for malaria, integrated management of childhood illness, human immunodeficiency virus (HIV) counselling and testing, basic emergency obstetric care and treatment of mental illness. Data were obtained from 1405 individuals (98% response rate) selected with a three-stage population-representative sampling method, and from 43 of Nimba county's 49 health facilities selected because of proximity to the study villages. Respondents travelled an average of 136 minutes to reach a health facility. All respondents could access malaria treatment at the nearest facility and 55.9% could access HIV testing. Only 26.8%, 14.5%, and 12.1% could access emergency obstetric care, integrated management of child illness and mental health services, respectively. Although there has been progress in providing basic services, rural Liberians still have limited access to life-saving health care. The reasons for the disparities in the services available to the population are technical and political. More frequently available services (HIV testing, malaria treatment) were less complex to implement and represented diseases favoured by bilateral and multilateral health sector donors. Systematic investments in the health system are required to ensure that health services respond to current and future health priorities.

  19. Inputs to quality: supervision, management, and community involvement in health facilities in Egypt in 2004.

    PubMed

    Cherlin, Emily J; Allam, Adel A; Linnander, Erika L; Wong, Rex; El-Toukhy, Essam; Sipsma, Heather; Krumholz, Harlan M; Curry, Leslie A; Bradley, Elizabeth H

    2011-10-20

    As low- and middle-income countries experience economic development, ensuring quality of health care delivery is a central component of health reform. Nevertheless, health reforms in low- and middle-income countries have focused more on access to services rather than the quality of these services, and reporting on quality has been limited. In the present study, we sought to examine the prevalence and regional variation in key management practices in Egyptian health facilities within three domains: supervision of the facility from the Ministry of Health and Population (MOHP), managerial processes, and patient and community involvement in care. We conducted a cross-sectional analysis of data from 559 facilities surveyed with the Egyptian Service Provision Assessment (ESPA) survey in 2004, the most recent such survey in Egypt. We registered on the Measure Demographic and Health Survey (DHS) website http://legacy.measuredhs.com/login.cfm to gain access to the survey data. From the ESPA sampled 559 MOHP facilities, we excluded a total of 79 facilities because they did not offer facility-based 24-hour care or have at least one physician working in the facility, resulting in a final sample of 480 facilities. The final sample included 76 general service hospitals, 307 rural health units, and 97 maternal and child health and urban health units (MCH/urban units). We used standard frequency analyses to describe facility characteristics and tested the statistical significance of regional differences using chi-square statistics. Nearly all facilities reported having external supervision within the 6 months preceding the interview. In contrast, key facility-level managerial processes, such as having routine and documented management meetings and applying quality assurance approaches, were uncommon. Involvement of communities and patients was also reported in a minority of facilities. Hospitals and health units located in Urban Egypt compared with more rural parts of Egypt were significantly more likely to have management committees that met at least monthly, to keep official records of the meetings, and to have an approach for reviewing quality assurance activities. Although the data precede the recent reform efforts of the MOHP, they provide a baseline against which future progress can be measured. Targeted efforts to improve facility-level management are critical to supporting quality improvement initiatives directed at improving the quality of health care throughout the country.

  20. Supervisory control and diagnostics system for the mirror fusion test facility: overview and status 1980

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McGoldrick, P.R.

    1981-01-01

    The Mirror Fusion Test Facility (MFTF) is a complex facility requiring a highly-computerized Supervisory Control and Diagnostics System (SCDS) to monitor and provide control over ten subsystems; three of which require true process control. SCDS will provide physicists with a method of studying machine and plasma behavior by acquiring and processing up to four megabytes of plasma diagnostic information every five minutes. A high degree of availability and throughput is provided by a distributed computer system (nine 32-bit minicomputers on shared memory). Data, distributed across SCDS, is managed by a high-bandwidth Distributed Database Management System. The MFTF operators' control roommore » consoles use color television monitors with touch sensitive screens; this is a totally new approach. The method of handling deviations to normal machine operation and how the operator should be notified and assisted in the resolution of problems has been studied and a system designed.« less

  1. Prevention and management of severe pre-eclampsia/eclampsia in Afghanistan

    PubMed Central

    2013-01-01

    Background An evidence-based strategy exists to reduce maternal morbidity and mortality associated with severe pre-eclampsia/eclampsia (PE/E), but it may be difficult to implement in low-resource settings. This study examines whether facilities that provide emergency obstetric and newborn care (EmONC) in Afghanistan have the capacity to manage severe PE/E cases. Methods A further analysis was conducted of the 2009–10 Afghanistan EmONC Needs Assessment. Assessors observed equipment and supplies available, and services provided at 78 of the 127 facilities offering comprehensive EmONC services and interviewed 224 providers. The providers also completed a written case scenario on severe PE/E. Descriptive statistics were used to summarize facility and provider characteristics. Student t-test, one-way ANOVA, and chi-square tests were performed to determine whether there were significant differences between facility types, doctors and midwives, and trained and untrained providers. Results The median number of severe PE/E cases in the past year was just 5 (range 0–42) at comprehensive health centers (CHCs) and district hospitals, compared with 44 (range 0–130) at provincial hospitals and 108 (range 32–540) at regional and specialized hospitals (p < 0.001). Most facilities had the drugs and supplies needed to treat severe PE/E, including the preferred anticonvulsant, magnesium sulfate (MgSO4). One-third of the smallest facilities and half of larger facilities reported administering a second-line drug, diazepam, in some cases. In the case scenario, 96% of doctors and 89% of midwives recognized that MgSO4 should be used to manage severe PE/E, but 42% of doctors and 58% of midwives also thought diazepam had a role to play. Providers who were trained on the use of MgSO4 scored significantly higher than untrained providers on six of 20 items in the case scenario. Providers at larger facilities significantly outscored those at smaller facilities on five items. There was a significant difference between doctors and midwives on only one item: continued use of anti-hypertensives after convulsions are controlled. Conclusions Drugs and supplies needed to treat severe PE/E are widely available at EmONC facilities in Afghanistan, but providers lack knowledge in some areas, especially concerning the use of MgSO4 and diazepam. Providers who have specialized training or work at larger facilities are better at managing cases of severe PE/E. The findings suggest a need to clarify service delivery guidelines, offer refresher training, and reinforce best practices with supervision and reinforcement. PMID:24119329

  2. Prevention and management of severe pre-eclampsia/eclampsia in Afghanistan.

    PubMed

    Kim, Young Mi; Ansari, Nasratullah; Kols, Adrienne; Tappis, Hannah; Currie, Sheena; Zainullah, Partamin; Bailey, Patricia; van Roosmalen, Jos; Stekelenburg, Jelle

    2013-10-12

    An evidence-based strategy exists to reduce maternal morbidity and mortality associated with severe pre-eclampsia/eclampsia (PE/E), but it may be difficult to implement in low-resource settings. This study examines whether facilities that provide emergency obstetric and newborn care (EmONC) in Afghanistan have the capacity to manage severe PE/E cases. A further analysis was conducted of the 2009-10 Afghanistan EmONC Needs Assessment. Assessors observed equipment and supplies available, and services provided at 78 of the 127 facilities offering comprehensive EmONC services and interviewed 224 providers. The providers also completed a written case scenario on severe PE/E. Descriptive statistics were used to summarize facility and provider characteristics. Student t-test, one-way ANOVA, and chi-square tests were performed to determine whether there were significant differences between facility types, doctors and midwives, and trained and untrained providers. The median number of severe PE/E cases in the past year was just 5 (range 0-42) at comprehensive health centers (CHCs) and district hospitals, compared with 44 (range 0-130) at provincial hospitals and 108 (range 32-540) at regional and specialized hospitals (p < 0.001). Most facilities had the drugs and supplies needed to treat severe PE/E, including the preferred anticonvulsant, magnesium sulfate (MgSO4). One-third of the smallest facilities and half of larger facilities reported administering a second-line drug, diazepam, in some cases. In the case scenario, 96% of doctors and 89% of midwives recognized that MgSO4 should be used to manage severe PE/E, but 42% of doctors and 58% of midwives also thought diazepam had a role to play. Providers who were trained on the use of MgSO4 scored significantly higher than untrained providers on six of 20 items in the case scenario. Providers at larger facilities significantly outscored those at smaller facilities on five items. There was a significant difference between doctors and midwives on only one item: continued use of anti-hypertensives after convulsions are controlled. Drugs and supplies needed to treat severe PE/E are widely available at EmONC facilities in Afghanistan, but providers lack knowledge in some areas, especially concerning the use of MgSO4 and diazepam. Providers who have specialized training or work at larger facilities are better at managing cases of severe PE/E. The findings suggest a need to clarify service delivery guidelines, offer refresher training, and reinforce best practices with supervision and reinforcement.

  3. ARES I-X Launch Prep

    NASA Image and Video Library

    2009-10-26

    Mission managers, from left, NASA Constellation Program manager Jeff Hanley, Ares I-X Launch Director Ed Mango, Ares I-X mission manager Bob Ess, Ground Operations Manager Philip "Pepper" Phillips, review the latest data in Firing Room One of the Launch Control Center (LCC) at the Kennedy Space Center during the launch countdown of the Ares I-X rocket in Cape Canaveral, Fla., Tuesday, Oct. 27, 2009. The flight test of Ares I-X will provide NASA with an early opportunity to test and prove flight characteristics, hardware, facilities and ground operations associated with the Ares I. Photo Credit: (NASA/Bill Ingalls)

  4. An Update of the Nation's Long-Term Strategic Needs for NASA's Aeronautics Test Facilities

    NASA Technical Reports Server (NTRS)

    Anton, Philip S.; Raman, Raj; Osburg, Jan; Kallimani, James G.

    2009-01-01

    The National Aeronautics and Space Administration's (NASA's) major wind tunnel (WT), propulsion test (PT), and simulation facilities exist to serve NASA's and the nation's aeronautics needs. RAND Corporation researchers conducted a prior study of these facilities from 2002 to 2003, identifying (1) NASA's continuing ability to serve national needs, (2) which facilities appear strategically important from an engineering perspective given the vehicle classes the nation investigates and produces, and (3) management challenges and issues. This documented briefing (DB) is the final report from a new, one-year study (conducted from September 2006 through January 2008), partially updating the prior assessment. The study focuses on updating the list of facilities in the prior study that were deemed to be strategically important (again, from an engineering perspective) in serving those needs. This update also adds a new assessment of national needs for six major aeronautics simulators at NASA and lists those deemed strategically important.

  5. Advancing Sensor Technology for Aerospace Propulsion

    NASA Technical Reports Server (NTRS)

    Figueroa, Fernando; Mercer, Carolyn R.

    2002-01-01

    NASA's Stennis Space Center (SSC) and Glenn Research Center (GRC) participate in the development of technologies for propulsion testing and propulsion applications in air and space transportation. Future transportation systems and the test facilities needed to develop and sustain them are becoming increasingly complex. Sensor technology is a fundamental pillar that makes possible development of complex systems that must operate in automatic mode (closed loop systems), or even in assisted-autonomous mode (highly self-sufficient systems such as planetary exploration spacecraft). Hence, a great deal of effort is dedicated to develop new sensors and related technologies to be used in research facilities, test facilities, and in vehicles and equipment. This paper describes sensor technologies being developed and in use at SSC and GRC, including new technologies in integrated health management involving sensors, components, processes, and vehicles.

  6. 40 CFR 63.11125 - What are my recordkeeping requirements?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Facilities Notifications, Records, and Reports § 63.11125 What are my recordkeeping requirements? (a) Each owner or operator subject to the management practices in § 63.11118 must keep records of all tests... tank subject to the management practices in Table 2 to this subpart must keep records documenting vapor...

  7. 40 CFR 63.11125 - What are my recordkeeping requirements?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Facilities Notifications, Records, and Reports § 63.11125 What are my recordkeeping requirements? (a) Each owner or operator subject to the management practices in § 63.11118 must keep records of all tests... tank subject to the management practices in Table 2 to this subpart must keep records documenting vapor...

  8. 40 CFR 63.11125 - What are my recordkeeping requirements?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Facilities Notifications, Records, and Reports § 63.11125 What are my recordkeeping requirements? (a) Each owner or operator subject to the management practices in § 63.11118 must keep records of all tests... tank subject to the management practices in Table 2 to this subpart must keep records documenting vapor...

  9. 40 CFR 63.11125 - What are my recordkeeping requirements?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Facilities Notifications, Records, and Reports § 63.11125 What are my recordkeeping requirements? (a) Each owner or operator subject to the management practices in § 63.11118 must keep records of all tests... tank subject to the management practices in Table 2 to this subpart must keep records documenting vapor...

  10. Swimming Pools. Managing School Facilities, Guide 2.

    ERIC Educational Resources Information Center

    Department for Education and Employment, London (England). Architects and Building Branch.

    This guide for schools with swimming pools offers advice concerning appropriate training for pool managers, the importance of water quality and testing, safety in the handling of chemicals, maintenance and cleaning requirements, pool security, and health concerns. The guide covers both indoor and outdoor pools, explains some technical terms,…

  11. 26 CFR 1.141-5 - Private loan financing test.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... lease or other contractual arrangement (for example, a management contract or an output contract) may in... person. Similarly, an output contract or a management contract with respect to a financed facility... (2) Updates or maintenance or support services with respect to computer software; and (B) The same...

  12. Advanced human-machine interface for collaborative building control

    DOEpatents

    Zheng, Xianjun S.; Song, Zhen; Chen, Yanzi; Zhang, Shaopeng; Lu, Yan

    2015-08-11

    A system for collaborative energy management and control in a building, including an energy management controller, one or more occupant HMIs that supports two-way communication between building occupants and a facility manager, and between building occupants and the energy management controller, and a facility manager HMI that supports two-way communication between the facility manager and the building occupants, and between the facility manager and the energy management controller, in which the occupant HMI allows building occupants to provide temperature preferences to the facility manager and the energy management controller, and the facility manager HMI allows the facility manager to configure an energy policy for the building as a set of rules and to view occupants' aggregated temperature preferences, and the energy management controller determines an optimum temperature range that resolves conflicting occupant temperature preferences and occupant temperature preferences that conflict with the facility manager's energy policy for the building.

  13. Calendar year 2002 annual site environmental report for Tonopah Test Range, Nevada and Kauai Test Facility, Hawaii.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wagner, Katrina; Sanchez, Rebecca V.; Mayeux, Lucie

    2003-09-01

    Tonopah Test Range (TTR) in Nevada and Kauai Test Facility (KTF) in Hawaii are government-owned, contractor-operated facilities operated by Sandia Corporation, a subsidiary of Lockheed Martin Corporation. The U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA), through the Sandia Site Office (SSO), in Albuquerque, NM, oversees TTR and KTF's operations. Sandia Corporation conducts operations at TTR in support of DOE/NNSA's Weapons Ordnance Program and has operated the site since 1957. Westinghouse Government Services subcontracts to Sandia Corporation in administering most of the environmental programs at TTR. Sandia Corporation operates KTF as a rocket preparation launching and tracking facility.more » This Annual Site Environmental Report (ASER) summarizes data and the compliance status of the environmental protection and monitoring program at TTR and KTF through Calendar Year (CY) 2002. The compliance status of environmental regulations applicable at these sites include state and federal regulations governing air emissions, wastewater effluent, waste management, terrestrial surveillance, and Environmental Restoration (ER) cleanup activities. Sandia Corporation is responsible only for those environmental program activities related to its operations. The DOE/NNSA, Nevada Site Office (NSO) retains responsibility for the cleanup and management of ER TTR sites. Currently, there are no ER Sites at KTF. Environmental monitoring and surveillance programs are required by DOE Order 5400.1, General Environmental Protection Program (DOE 1990) and DOE Order 231.1, Environment, Safety, and Health Reporting (DOE 1996).« less

  14. A facility for training Space Station astronauts

    NASA Technical Reports Server (NTRS)

    Hajare, Ankur R.; Schmidt, James R.

    1992-01-01

    The Space Station Training Facility (SSTF) will be the primary facility for training the Space Station Freedom astronauts and the Space Station Control Center ground support personnel. Conceptually, the SSTF will consist of two parts: a Student Environment and an Author Environment. The Student Environment will contain trainers, instructor stations, computers and other equipment necessary for training. The Author Environment will contain the systems that will be used to manage, develop, integrate, test and verify, operate and maintain the equipment and software in the Student Environment.

  15. 48 CFR 970.3770 - Facilities management.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Facilities management. 970... REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Facilities Management Contracting 970.3770 Facilities management. ...

  16. 48 CFR 970.3770 - Facilities management.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Facilities management. 970... REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Facilities Management Contracting 970.3770 Facilities management. ...

  17. 48 CFR 970.3770 - Facilities management.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Facilities management. 970... REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Facilities Management Contracting 970.3770 Facilities management. ...

  18. 48 CFR 970.3770 - Facilities management.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Facilities management. 970... REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Facilities Management Contracting 970.3770 Facilities management. ...

  19. 48 CFR 970.3770 - Facilities management.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Facilities management. 970... REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Facilities Management Contracting 970.3770 Facilities management. ...

  20. Quality use of antipsychotic medicines inresidential aged care facilities in New Zealand.

    PubMed

    Ndukwe, Henry C; Nishtala, Prasad S; Wang, Ting; Tordoff, June M

    2016-12-01

    INTRODUCTION Antipsychotic medicines are used regularly or when required in residential aged care facilities to treat symptoms of dementia, but have been associated with several adverse effects. AIM The aim of this study was to examine 'quality use' of antipsychotic medicines in residential aged care facilities in New Zealand, by surveying nurse managers. METHODS A cross-sectional survey was mailed to 318 nurse managers working in a nationally representative sample of aged care facilities. A purpose-developed, pre-tested, 22-item structured questionnaire was used to explore practice related to the quality use of antipsychotic medicines. RESULTS Overall, 31.4% of nurse managers responded to the survey. They mostly (88%) had ≥ 1 year's relevant work experience and 83% of facilities provided care for those within the range of 21 to 100 residents. Respondents reported that staff education on dementia management occurred early in employment. Two-thirds of participants reported non-pharmacological interventions were commonly used for managing challenging behaviours, while less than half (45%) cited administering antipsychotic medicine. Respondents reported 'managing behavioural symptoms' (81%) as one of the main indications for antipsychotic use. Frequently identified adverse effects of antipsychotic medicines were drowsiness or sedation (64%) and falls (61%). Over 90% reported general practitioners reviewed antipsychotic use with respect to residents' target behaviour 3-monthly, and two-thirds used an assessment tool to appraise residents' behaviour. DISCUSSION Staff education on dementia management soon after employment and resident 3-monthly antipsychotic medicine reviews were positive findings. However, a wider use of behavioural assessment tools might improve the care of residents with dementia and the quality use of antipsychotic medicines.

  1. Health service providers in Somalia: their readiness to provide malaria case-management

    PubMed Central

    Noor, Abdisalan M; Rage, Ismail A; Moonen, Bruno; Snow, Robert W

    2009-01-01

    Background Studies have highlighted the inadequacies of the public health sector in sub-Saharan African countries in providing appropriate malaria case management. The readiness of the public health sector to provide malaria case-management in Somalia, a country where there has been no functioning central government for almost two decades, was investigated. Methods Three districts were purposively sampled in each of the two self-declared states of Puntland and Somaliland and the south-central region of Somalia, in April-November 2007. A survey and mapping of all public and private health service providers was undertaken. Information was recorded on services provided, types of anti-malarial drugs used and stock, numbers and qualifications of staff, sources of financial support and presence of malaria diagnostic services, new treatment guidelines and job aides for malaria case-management. All settlements were mapped and a semi-quantitative approach was used to estimate their population size. Distances from settlements to public health services were computed. Results There were 45 public health facilities, 227 public health professionals, and 194 private pharmacies for approximately 0.6 million people in the three districts. The median distance to public health facilities was 6 km. 62.3% of public health facilities prescribed the nationally recommended anti-malarial drug and 37.7% prescribed chloroquine as first-line therapy. 66.7% of public facilities did not have in stock the recommended first-line malaria therapy. Diagnosis of malaria using rapid diagnostic tests (RDT) or microscopy was performed routinely in over 90% of the recommended public facilities but only 50% of these had RDT in stock at the time of survey. National treatment guidelines were available in 31.3% of public health facilities recommended by the national strategy. Only 8.8% of the private pharmacies prescribed artesunate plus sulphadoxine/pyrimethamine, while 53.1% prescribed chloroquine as first-line therapy. 31.4% of private pharmacies also provided malaria diagnosis using RDT or microscopy. Conclusion Geographic access to public health sector is relatively low and there were major shortages of appropriate guidelines, anti-malarials and diagnostic tests required for appropriate malaria case management. Efforts to strengthen the readiness of the health sector in Somalia to provide malaria case management should improve availability of drugs and diagnostic kits; provide appropriate information and training; and engage and regulate the private sector to scale up malaria control. PMID:19439097

  2. Health service providers in Somalia: their readiness to provide malaria case-management.

    PubMed

    Noor, Abdisalan M; Rage, Ismail A; Moonen, Bruno; Snow, Robert W

    2009-05-13

    Studies have highlighted the inadequacies of the public health sector in sub-Saharan African countries in providing appropriate malaria case management. The readiness of the public health sector to provide malaria case-management in Somalia, a country where there has been no functioning central government for almost two decades, was investigated. Three districts were purposively sampled in each of the two self-declared states of Puntland and Somaliland and the south-central region of Somalia, in April-November 2007. A survey and mapping of all public and private health service providers was undertaken. Information was recorded on services provided, types of anti-malarial drugs used and stock, numbers and qualifications of staff, sources of financial support and presence of malaria diagnostic services, new treatment guidelines and job aides for malaria case-management. All settlements were mapped and a semi-quantitative approach was used to estimate their population size. Distances from settlements to public health services were computed. There were 45 public health facilities, 227 public health professionals, and 194 private pharmacies for approximately 0.6 million people in the three districts. The median distance to public health facilities was 6 km. 62.3% of public health facilities prescribed the nationally recommended anti-malarial drug and 37.7% prescribed chloroquine as first-line therapy. 66.7% of public facilities did not have in stock the recommended first-line malaria therapy. Diagnosis of malaria using rapid diagnostic tests (RDT) or microscopy was performed routinely in over 90% of the recommended public facilities but only 50% of these had RDT in stock at the time of survey. National treatment guidelines were available in 31.3% of public health facilities recommended by the national strategy. Only 8.8% of the private pharmacies prescribed artesunate plus sulphadoxine/pyrimethamine, while 53.1% prescribed chloroquine as first-line therapy. 31.4% of private pharmacies also provided malaria diagnosis using RDT or microscopy. Geographic access to public health sector is relatively low and there were major shortages of appropriate guidelines, anti-malarials and diagnostic tests required for appropriate malaria case management. Efforts to strengthen the readiness of the health sector in Somalia to provide malaria case management should improve availability of drugs and diagnostic kits; provide appropriate information and training; and engage and regulate the private sector to scale up malaria control.

  3. NASA Construction of Facilities Validation Processes - Total Building Commissioning (TBCx)

    NASA Technical Reports Server (NTRS)

    Hoover, Jay C.

    2004-01-01

    Key Atributes include: Total Quality Management (TQM) System that looks at all phases of a project. A team process that spans boundaries. A Commissioning Authority to lead the process. Commissioning requirements in contracts. Independent design review to verify compliance with Facility Project Requirements (FPR). Formal written Commissioning Plan with Documented Results. Functional performance testing (FPT) against the requirements document.

  4. Moonport: A History of Apollo Launch Facilities and Operations

    NASA Technical Reports Server (NTRS)

    Benson, C. D.; Faherty, W. B.

    1978-01-01

    The development of the Apollo f launch facilities and launch operations is described from the beginning of design through the final launch. Management techniques, innovation in automation, and testing on the ground to avoid failures in space are among the topics covered. The impact of the Apollo program on the citrus groves and quiet beaches of Florida's east coast is included.

  5. Quality of Inpatient Pediatric Case Management for Four Leading Causes of Child Mortality at Six Government-Run Ugandan Hospitals

    PubMed Central

    Sears, David; Mpimbaza, Arthur; Kigozi, Ruth; Sserwanga, Asadu; Chang, Michelle A.; Kapella, Bryan K.; Yoon, Steven; Kamya, Moses R.; Dorsey, Grant; Ruel, Theodore

    2015-01-01

    Background A better understanding of case management practices is required to improve inpatient pediatric care in resource-limited settings. Here we utilize data from a unique health facility-based surveillance system at six Ugandan hospitals to evaluate the quality of pediatric case management and the factors associated with appropriate care. Methods All children up to the age of 14 years admitted to six district or regional hospitals over 15 months were included in the study. Four case management categories were defined for analysis: suspected malaria, selected illnesses requiring antibiotics, suspected anemia, and diarrhea. The quality of case management for each category was determined by comparing recorded treatments with evidence-based best practices as defined in national guidelines. Associations between variables of interest and the receipt of appropriate case management were estimated using multivariable logistic regression. Results A total of 30,351 admissions were screened for inclusion in the analysis. Ninety-two percent of children met criteria for suspected malaria and 81% received appropriate case management. Thirty-two percent of children had selected illnesses requiring antibiotics and 89% received appropriate antibiotics. Thirty percent of children met criteria for suspected anemia and 38% received appropriate case management. Twelve percent of children had diarrhea and 18% received appropriate case management. Multivariable logistic regression revealed large differences in the quality of care between health facilities. There was also a strong association between a positive malaria diagnostic test result and the odds of receiving appropriate case management for comorbid non-malarial illnesses - children with a positive malaria test were more likely to receive appropriate care for anemia and less likely for illnesses requiring antibiotics and diarrhea. Conclusions Appropriate management of suspected anemia and diarrhea occurred infrequently. Pediatric quality improvement initiatives should target deficiencies in care unique to each health facility, and interventions should focus on the simultaneous management of multiple diagnoses. PMID:25992620

  6. An Overview of the NASA Aeronautics Test Program Strategic Plan

    NASA Technical Reports Server (NTRS)

    Marshall, Timothy J.

    2010-01-01

    U.S. leadership in aeronautics depends on ready access to technologically advanced, efficient, and affordable aeronautics test capabilities. These systems include major wind tunnels and propulsion test facilities and flight test capabilities. The federal government owns the majority of the major aeronautics test capabilities in the United States, primarily through the National Aeronautics and Space Administration (NASA) and the Department of Defense (DoD), however an overarching strategy for management of these national assets was needed. Therefore, in Fiscal Year (FY) 2006 NASA established the Aeronautics Test Program (ATP) as a two-pronged strategic initiative to: (1) retain and invest in NASA aeronautics test capabilities considered strategically important to the agency and the nation, and (2) establish a strong, high level partnership with the DoD Test Resources Management Center (TRMC), stewards of the DoD test and evaluation infrastructure. Since then, approximately seventy percent of the ATP budget has been directed to underpin fixed and variable costs of facility operations within its portfolio and the balance towards strategic investments in its test facilities, including maintenance and capability upgrades. Also, a strong guiding coalition was established through the National Partnership for Aeronautics Testing (NPAT), with governance by the senior leadership of NASA s Aeronautics Research Mission Directorate (ARMD) and the DoD's TRMC. As part of its strategic planning, ATP has performed or participated in many studies and analyses, including assessments of major NASA and DoD aeronautics test capabilities, test facility condition evaluations and market research. The ATP strategy has also benefitted from unpublished RAND research and analysis by Ant n et al. (2009). Together, these various studies, reports and assessments serve as a foundation for a new, five year strategic plan that will guide ATP through FY 2014. Our vision for the future is a balanced portfolio of aeronautics ground and flight test capabilities that advance U.S. leadership in aeronautics in the short and long term. Key to the ATP vision is the concept of availability, not necessarily ownership; that is, NASA does not have to own and operate all facilities that are envisioned for future aeronautics testing. However, ATP will enable access to capabilities which are needed but not owned by NASA through strategic partnerships and reliance agreements. This paper will outline the major aspects of the ATP strategic plan for achieving its mission.

  7. Ares Launch Vehicles Development Awakens Historic Test Stands at NASA's Marshall Space Flight Center

    NASA Technical Reports Server (NTRS)

    Dumbacher, Daniel L.; Burt, Richard K.

    2008-01-01

    This paper chronicles the rebirth of two national rocket testing assets located at NASA's Marshall Space Flight Center: the Dynamic Test Stand (also known as the Ground Vibration Test Stand) and the Static Test Stand (also known as the Main Propulsion Test Stand). It will touch on the historical significance of these special facilities, while introducing the requirements driving modifications for testing a new generation space transportation system, which is set to come on line after the Space Shuttle is retired in 2010. In many ways, America's journey to explore the Moon begins at the Marshall Center, which is developing the Ares I crew launch vehicle and the Ares V cargo launch vehicle, along with managing the Lunar Precursor Robotic Program and leading the Lunar Lander descent stage work, among other Constellation Program assignments. An important component of this work is housed in Marshall's Engineering Directorate, which manages more than 40 facilities capable of a full spectrum of rocket and space transportation technology testing - from small components to full-up engine systems. The engineers and technicians who operate these test facilities have more than a thousand years of combined experience in this highly specialized field. Marshall has one of the few government test groups in the United States with responsibility for the overall performance of a test program from conception to completion. The Test Laboratory has facilities dating back to the early 1960s, when the test stands needed for the Apollo Program and other scientific endeavors were commissioned and built along the Marshall Center's southern boundary, with logistics access by air, railroad, and barge or boat on the Tennessee River. NASA and its industry partners are designing and developing a new human-rated system based on the requirements for safe, reliable, and cost-effective transportation solutions. Given below are summaries of the Dynamic Test Stand and the Static Test Stand capabilities, along with an introduction to the new missions that these sleeping giants will be fulfilling as NASA readies the Ares I for service in the 2015 timeframe, and plans the development work for fielding the Ares V late next decade (fig. 1). Validating modern computer design models and techniques requires the sorts of data that can only be generated by these one-of-a-kind facilities.

  8. Safety Assurances at Space Test Centres: Lessons Learned

    NASA Astrophysics Data System (ADS)

    Alarcon Ruiz, Raul; O'Neil, Sean; Valls, Rafel Prades

    2010-09-01

    The European Space Agency’s(ESA) experts in quality, cleanliness and contamination control, safety, test facilities and test methods have accumulated valuable experience during the performance of dedicated audits of space test centres in Europe over a period of 10 years. This paper is limited to a summary of the safety findings and provides a valuable reference to the lessons learned, identifying opportunities for improvement in the areas of risk prevention measures associated to the safety of all test centre personnel, the test specimen, the test facilities and associated infrastructure. Through the analysis of the audit results the authors present what are the main lessons learned, and conclude how an effective safety management system will contribute to successful test campaigns and have a positive impact on the cost and schedule of space projects.

  9. 41 CFR 102-74.15 - What are the facility management responsibilities of occupant agencies?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What are the facility management responsibilities of occupant agencies? 102-74.15 Section 102-74.15 Public Contracts and Property... PROPERTY 74-FACILITY MANAGEMENT Facility Management § 102-74.15 What are the facility management...

  10. KENNEDY SPACE CENTER, FLA. - Louis MacDowell (right), Testbed manager, explains to Center Director Jim Kennedy the use of astmospheric calibration specimens. Placed at various locations, they can rank the corrosivity of the given environment. The KSC Beach Corrosion Test Site was established in the 1960s and has provided more than 30 years of historical information on the long-term performance of many materials in use at KSC and other locations around the world. Located 100 feet from the Atlantic Ocean approximately 1 mile south of the Space Shuttle launch sites, the test facility includes an atmospheric exposure site, a flowing seawater exposure site, and an on-site electrochemistry laboratory and monitoring station. The beach laboratory is used to conduct real-time corrosion experiments and provides for the remote monitoring of surrounding weather conditions. The newly added flowing seawater immersion facility provides for the immersion testing of materials and devices under controlled conditions.

    NASA Image and Video Library

    2003-08-21

    KENNEDY SPACE CENTER, FLA. - Louis MacDowell (right), Testbed manager, explains to Center Director Jim Kennedy the use of astmospheric calibration specimens. Placed at various locations, they can rank the corrosivity of the given environment. The KSC Beach Corrosion Test Site was established in the 1960s and has provided more than 30 years of historical information on the long-term performance of many materials in use at KSC and other locations around the world. Located 100 feet from the Atlantic Ocean approximately 1 mile south of the Space Shuttle launch sites, the test facility includes an atmospheric exposure site, a flowing seawater exposure site, and an on-site electrochemistry laboratory and monitoring station. The beach laboratory is used to conduct real-time corrosion experiments and provides for the remote monitoring of surrounding weather conditions. The newly added flowing seawater immersion facility provides for the immersion testing of materials and devices under controlled conditions.

  11. Quality of uncomplicated malaria case management in Ghana among insured and uninsured patients.

    PubMed

    Fenny, Ama P; Hansen, Kristian S; Enemark, Ulrika; Asante, Felix A

    2014-07-24

    The National Health Insurance Act, 2003 (Act 650) established the National Health Insurance Scheme (NHIS) in Ghana with the aim of increasing access to health care and improving the quality of basic health care services for all citizens. The main objective is to assess the effect of health insurance on the quality of case management for patients with uncomplicated malaria, ascertaining any significant differences in treatment between insured and non-insured patients. A structured questionnaire was used to collect data from 523 respondents diagnosed with malaria and prescribed malaria drugs from public and private health facilities in 3 districts across Ghana's three ecological zones. Collected information included initial examinations performed on patients (temperature, weight, age, blood pressure and pulse); observations of malaria symptoms by trained staff, laboratory tests conducted and type of drugs prescribed. Insurance status of patients, age, gender, education level and occupation were asked in the interviews. Of the 523 patients interviewed, only 40 (8%) were uninsured. Routine recording of the patients' age, weight, and temperature was high in all the facilities. In general, assessments needed to identify suspected malaria were low in all the facilities with hot body/fever and headache ranking the highest and convulsion ranking the lowest. Parasitological assessments in all the facilities were also very low. All patients interviewed were prescribed ACTs which is in adherence to the drug of choice for malaria treatment in Ghana. However, there were no significant differences in the quality of malaria treatment given to the uninsured and insured patients. Adherence to the standard protocol of malaria treatment is low. This is especially the case for parasitological confirmation of all suspected malaria patients before treatment with an antimalarial as currently recommended for the effective management of malaria in the country. The results show that about 16 percent of total sample were parasitologically tested. Effective management of the disease demands proper diagnosis and treatment and therefore facilities need to be adequately supplied with RDTs or be equipped with well functioning laboratories to provide adequate testing.

  12. Quality of uncomplicated malaria case management in Ghana among insured and uninsured patients

    PubMed Central

    2014-01-01

    Introduction The National Health Insurance Act, 2003 (Act 650) established the National Health Insurance Scheme (NHIS) in Ghana with the aim of increasing access to health care and improving the quality of basic health care services for all citizens. The main objective is to assess the effect of health insurance on the quality of case management for patients with uncomplicated malaria, ascertaining any significant differences in treatment between insured and non-insured patients. Method A structured questionnaire was used to collect data from 523 respondents diagnosed with malaria and prescribed malaria drugs from public and private health facilities in 3 districts across Ghana’s three ecological zones. Collected information included initial examinations performed on patients (temperature, weight, age, blood pressure and pulse); observations of malaria symptoms by trained staff, laboratory tests conducted and type of drugs prescribed. Insurance status of patients, age, gender, education level and occupation were asked in the interviews. Results Of the 523 patients interviewed, only 40 (8%) were uninsured. Routine recording of the patients’ age, weight, and temperature was high in all the facilities. In general, assessments needed to identify suspected malaria were low in all the facilities with hot body/fever and headache ranking the highest and convulsion ranking the lowest. Parasitological assessments in all the facilities were also very low. All patients interviewed were prescribed ACTs which is in adherence to the drug of choice for malaria treatment in Ghana. However, there were no significant differences in the quality of malaria treatment given to the uninsured and insured patients. Conclusion Adherence to the standard protocol of malaria treatment is low. This is especially the case for parasitological confirmation of all suspected malaria patients before treatment with an antimalarial as currently recommended for the effective management of malaria in the country. The results show that about 16 percent of total sample were parasitologically tested. Effective management of the disease demands proper diagnosis and treatment and therefore facilities need to be adequately supplied with RDTs or be equipped with well functioning laboratories to provide adequate testing. PMID:25056139

  13. [Security Management in Clinical Laboratory Departments and Facilities: Current Status and Issues].

    PubMed

    Ishida, Haku; Nakamura, Junji; Yoshida, Hiroshi; Koike, Masaru; Inoue, Yuji

    2014-11-01

    We conducted a questionnaire survey regarding the current activities for protecting patients' privacy and the security of information systems (IS) related to the clinical laboratory departments of university hospitals, certified training facilities for clinical laboratories, and general hospitals in Yamaguchi Prefecture. The response rate was 47% from 215 medical institutions, including three commercial clinical laboratory centers. The results showed that there were some differences in management activities among facilities with respect to continuing education, the documentation or regulation of operational management for paper records, electronic information, remaining samples, genetic testing, and laboratory information for secondary use. They were suggested to be caused by differences in functions between university and general hospitals, differences in the scale of hospitals, or whether or not hospitals have received accreditation or ISO 15189. Regarding the IS, although the majority of facilities had sufficiently employed the access control to IS, there was some room for improvement in the management of special cases such as VIPs and patients with HIV infection. Furthermore, there were issues regarding the login method for computers shared by multiple staff, the showing of the names of personnel in charge of reports, and the risks associated with direct connections to systems and the Internet and the use of portable media such as USB memory sticks. These results indicated that further efforts are necessary for each facility to continue self-assessment and make improvements.

  14. Measuring Quality Gaps in TB Screening in South Africa Using Standardised Patient Analysis.

    PubMed

    Christian, Carmen S; Gerdtham, Ulf-G; Hompashe, Dumisani; Smith, Anja; Burger, Ronelle

    2018-04-12

    This is the first multi-district Standardised Patient (SP) study in South Africa. It measures the quality of TB screening at primary healthcare (PHC) facilities. We hypothesise that TB screening protocols and best practices are poorly adhered to at the PHC level. The SP method allows researchers to observe how healthcare providers identify, test and advise presumptive TB patients, and whether this aligns with clinical protocols and best practice. The study was conducted at PHC facilities in two provinces and 143 interactions at 39 facilities were analysed. Only 43% of interactions resulted in SPs receiving a TB sputum test and being offered an HIV test. TB sputum tests were conducted routinely (84%) while HIV tests were offered less frequently (47%). Nurses frequently neglected to ask SPs whether their household contacts had confirmed TB (54%). Antibiotics were prescribed without taking temperatures in 8% of cases. The importance of returning to the facility to receive TB test results was only explained in 28%. The SP method has highlighted gaps in clinical practice, signalling missed opportunities. Early detection of sub-optimal TB care is instrumental in decreasing TB-related morbidity and mortality. The findings provide the rationale for further quality improvement work in TB management.

  15. Configuration management issues and objectives for a real-time research flight test support facility

    NASA Technical Reports Server (NTRS)

    Yergensen, Stephen; Rhea, Donald C.

    1988-01-01

    Presented are some of the critical issues and objectives pertaining to configuration management for the NASA Western Aeronautical Test Range (WATR) of Ames Research Center. The primary mission of the WATR is to provide a capability for the conduct of aeronautical research flight test through real-time processing and display, tracking, and communications systems. In providing this capability, the WATR must maintain and enforce a configuration management plan which is independent of, but complimentary to, various research flight test project configuration management systems. A primary WATR objective is the continued development of generic research flight test project support capability, wherein the reliability of WATR support provided to all project users is a constant priority. Therefore, the processing of configuration change requests for specific research flight test project requirements must be evaluated within a perspective that maintains this primary objective.

  16. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Griffith, Stacy Rene; Agogino, Karen; Li, Jun

    Tonopah Test Range (TTR) in Nevada and Kauai Test Facility (KTF) in Hawaii are government-owned, contractor-operated facilities managed and operated by Sandia Corporation (Sandia), a wholly owned subsidiary of Lockheed Martin Corporation. The U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA), through the Sandia Field Office (SFO), in Albuquerque, New Mexico, administers the contract and oversees contractor operations at TTR and KTF. Sandia manages and conducts operations at TTR in support of the DOE/NNSA’s Weapons Ordnance Program and has operated the site since 1957. Navarro Research and Engineering subcontracts to Sandia in administering most of the environmental programsmore » at TTR. Sandia operates KTF as a rocket preparation launching and tracking facility. This Annual Site Environmental Report summarizes data and the compliance status of the sustainability, environmental protection, and monitoring program at TTR and KTF through Calendar Year 2013. The compliance status of environmental regulations applicable at these sites include state and federal regulations governing air emissions, wastewater effluent, waste management, terrestrial surveillance, Environmental Restoration (ER) cleanup activities, and the National Environmental Policy Act. Sandia is responsible only for those environmental program activities related to its operations. The DOE/NNSA/Nevada Field Office retains responsibility for the cleanup and management of TTR ER sites. Environmental monitoring and surveillance programs are required by DOE Order 231.1B, Environment, Safety, and Health Reporting (DOE 2012).« less

  17. 41 CFR 102-74.155 - What energy conservation policy must Federal agencies follow in the management of facilities?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... policy must Federal agencies follow in the management of facilities? 102-74.155 Section 102-74.155 Public... MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Energy Conservation § 102-74.155 What energy conservation policy must Federal agencies follow in the management of facilities...

  18. The impact of facility audits, evaluation reports and incentives on motivation and supply management among family planning service providers: an interventional study in two districts in Maputo Province, Mozambique.

    PubMed

    Vermandere, Heleen; Galle, Anna; Griffin, Sally; de Melo, Málica; Machaieie, Lino; Van Braeckel, Dirk; Degomme, Olivier

    2017-05-02

    Good progress is being made towards universal access to contraceptives, however stock-outs still jeopardize progress. A seldom considered but important building block in optimizing supply management is the degree to which health workers feel motivated and responsible for monitoring supply. We explored how and to what extent motivation can be improved, and the impact this can have on avoiding stock-outs. Fifteen health facilities in Maputo Province, Mozambique, were divided into 3 groups (2 intervention groups and 1 control), and 10 monthly audits were implemented in each of these 15 facilities to collect data through examination of stock cards and stock-counts of 6 contraceptives. Based on these audits, the 2 intervention groups received a monthly evaluation report reflecting the quality of their supply management. One of these 2 groups was also awarded material incentives conditional on their performance. A Wilcoxon-Mann Whitney test was used to detect differences between the groups in the average number of stocked-out centres, while changes over time were verified through applying a Friedman test. Additionally, staff motivation was measured through interviewing health care providers of all centres at baseline, and after 5 and 10 months. To detect differences between the groups and changes over time, a Kruskal Wallis and a Wilcoxon signed-rank test were applied, respectively. Motivation reported by providers (n = 55, n = 40 and n = 39 at baseline, 1st and 2nd follow-up respectively) was high in all groups, during all rounds, and did not change over time. Facilities in the intervention groups had better supply management results (including less stock-outs) during the entire intervention period compared with those in the control group, but the difference was only significant for the group receiving both material incentives and a monthly evaluation. However, our data also suggest that supply management also improved in control facilities, receiving only a monthly audit. During this study, more stock-outs occurred for family planning methods with lower demand, but the number of stock-outs per family planning method in the intervention groups was only significantly lower, compared with the control group, for female condoms. While a rise in motivation was not measurable, stock management was enhanced possibly as a result of the monthly audits. This activity was primarily for data collection, but was described as motivating and supportive, indicating the importance of feedback on health workers' accomplishments. More research is needed to quantify the additional impact of the interventions (distribution of evaluation reports and material incentives) on staff motivation and supply management. Special attention should be paid to supply management of less frequently used contraceptive methods.

  19. High-Lift Flight Tunnel - Phase II Report. Phase 2 Report

    NASA Technical Reports Server (NTRS)

    Lofftus, David; Lund, Thomas; Rote, Donald; Bushnell, Dennis M. (Technical Monitor)

    2000-01-01

    The High-Lift Flight Tunnel (HiLiFT) concept is a revolutionary approach to aerodynamic ground testing. This concept utilizes magnetic levitation and linear motors to propel an aerodynamic model through a tube containing a quiescent test medium. This medium (nitrogen) is cryogenic and pressurized to achieve full flight Reynolds numbers higher than any existing ground test facility world-wide for the range of 0.05 to 0.50 Mach. The results of the Phase II study provide excellent assurance that the HiLiFT concept will provide a valuable low-speed, high Reynolds number ground test facility. The design studies concluded that the HiLiFT facility is feasible to build and operate and the analytical studies revealed no insurmountable difficulties to realizing a practical high Reynolds number ground test facility. It was determined that a national HiLiFT facility, including development, would cost approximately $400M and could be operational by 2013 if fully funded. Study participants included National Aeronautics and Space Administration Langley Research Center as the Program Manager and MSE Technology Applications, Inc., (MSE) of Butte, Montana as the prime contractor and study integrator. MSE#s subcontractors included the University of Texas at Arlington for aerodynamic analyses and the Argonne National Laboratory for magnetic levitation and linear motor technology support.

  20. SSPF Operational Upgrades

    NASA Image and Video Library

    2016-11-15

    During a ribbon cutting ceremony in the high bay of the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, center director Bob Cabana, far left, is joined by Bill Dowdell, Kennedy's International Space Station technical director, Josephine Burnett, director of Exploration Research and Technology, Andy Allen, Jacobs vice president and general manager and Test and Operations Support Contract program manager, and Jeff McAlear, Jacobs director of Processing Services. The event celebrated completion of facility modifications to improve processing and free up zones tailored to a variety of needs supporting a robust assortment of space-bound hardware including NASA programs and commercial space companies.

  1. Process material management in the Space Station environment

    NASA Technical Reports Server (NTRS)

    Perry, J. L.; Humphries, W. R.

    1988-01-01

    The Space Station will provide a unique facility for conducting material-processing and life-science experiments under microgravity conditions. These conditions place special requirements on the U.S. Laboratory for storing and transporting chemicals and process fluids, reclaiming water from selected experiments, treating and storing experiment wastes, and providing vacuum utilities. To meet these needs and provide a safe laboratory environment, the Process Material Management System (PMMS) is being developed. Preliminary design requirements and concepts related to the PMMS are addressed, and the MSFC PMMS breadboard test facility and a preliminary plan for validating the overall system design are discussed.

  2. 20 CFR 638.303 - Site selection and facilities management.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Site selection and facilities management. 638... Facilities Management § 638.303 Site selection and facilities management. (a) The Job Corps Director shall... center, facilities engineering and real estate management will be conducted by the Job Corps Director or...

  3. NASA Data Acquisition System Software Development for Rocket Propulsion Test Facilities

    NASA Technical Reports Server (NTRS)

    Herbert, Phillip W., Sr.; Elliot, Alex C.; Graves, Andrew R.

    2015-01-01

    Current NASA propulsion test facilities include Stennis Space Center in Mississippi, Marshall Space Flight Center in Alabama, Plum Brook Station in Ohio, and White Sands Test Facility in New Mexico. Within and across these centers, a diverse set of data acquisition systems exist with different hardware and software platforms. The NASA Data Acquisition System (NDAS) is a software suite designed to operate and control many critical aspects of rocket engine testing. The software suite combines real-time data visualization, data recording to a variety formats, short-term and long-term acquisition system calibration capabilities, test stand configuration control, and a variety of data post-processing capabilities. Additionally, data stream conversion functions exist to translate test facility data streams to and from downstream systems, including engine customer systems. The primary design goals for NDAS are flexibility, extensibility, and modularity. Providing a common user interface for a variety of hardware platforms helps drive consistency and error reduction during testing. In addition, with an understanding that test facilities have different requirements and setups, the software is designed to be modular. One engine program may require real-time displays and data recording; others may require more complex data stream conversion, measurement filtering, or test stand configuration management. The NDAS suite allows test facilities to choose which components to use based on their specific needs. The NDAS code is primarily written in LabVIEW, a graphical, data-flow driven language. Although LabVIEW is a general-purpose programming language; large-scale software development in the language is relatively rare compared to more commonly used languages. The NDAS software suite also makes extensive use of a new, advanced development framework called the Actor Framework. The Actor Framework provides a level of code reuse and extensibility that has previously been difficult to achieve using LabVIEW. The

  4. Cryogenic Design of the New High Field Magnet Test Facility at CERN

    NASA Astrophysics Data System (ADS)

    Benda, V.; Pirotte, O.; De Rijk, G.; Bajko, M.; Craen, A. Vande; Perret, Ph.; Hanzelka, P.

    In the framework of the R&D program related to the Large Hadron Collider (LHC) upgrades, a new High Field Magnet (HFM) vertical test bench is required. This facility located in the SM18 cryogenic test hall shall allow testing of up to 15 tons superconducting magnets with energy up to 10 MJ in a temperature range between 1.9 K and 4.5 K. The article describes the cryogenic architecture to be inserted in the general infrastructure of SM18 including the process and instrumentation diagram, the different operating phases including strategy for magnet cool down and warm up at controlled speed and quench management as well as the design of the main components.

  5. Securing PCs and Data in Libraries and Schools: A Handbook with Menuing, Anti-Virus, and Other Protective Software.

    ERIC Educational Resources Information Center

    Benson, Allen C.

    This handbook is designed to help readers identify and eliminate security risks, with sound recommendations and library-tested security software. Chapter 1 "Managing Your Facilities and Assessing Your Risks" addresses fundamental management responsibilities including planning for a secure system, organizing computer-related information, assessing…

  6. ENVIRONMENTAL TECHNOLOGY VERIFICATION REPORT: STORMWATER SOURCE AREA TREATMENT DEVICE - STORMWATER MANAGEMENT INC., CATCH BASIN STORMFILTER®

    EPA Science Inventory

    Verification testing of the Stormwater Management CatchBasin StormFilter® (CBSF) was conducted on a 0.16 acre drainage basin at the City of St. Clair Shores, Michigan Department of Public Works facility. The four-cartridge CBSF consists of a storm grate and filter chamber inlet b...

  7. The Design of PSB-VVER Experiments Relevant to Accident Management

    NASA Astrophysics Data System (ADS)

    Nevo, Alessandro Del; D'Auria, Francesco; Mazzini, Marino; Bykov, Michael; Elkin, Ilya V.; Suslov, Alexander

    Experimental programs carried-out in integral test facilities are relevant for validating the best estimate thermal-hydraulic codes(1), which are used for accident analyses, design of accident management procedures, licensing of nuclear power plants, etc. The validation process, in fact, is based on well designed experiments. It consists in the comparison of the measured and calculated parameters and the determination whether a computer code has an adequate capability in predicting the major phenomena expected to occur in the course of transient and/or accidents. University of Pisa was responsible of the numerical design of the 12 experiments executed in PSB-VVER facility (2), operated at Electrogorsk Research and Engineering Center (Russia), in the framework of the TACIS 2.03/97 Contract 3.03.03 Part A, EC financed (3). The paper describes the methodology adopted at University of Pisa, starting form the scenarios foreseen in the final test matrix until the execution of the experiments. This process considers three key topics: a) the scaling issue and the simulation, with unavoidable distortions, of the expected performance of the reference nuclear power plants; b) the code assessment process involving the identification of phenomena challenging the code models; c) the features of the concerned integral test facility (scaling limitations, control logics, data acquisition system, instrumentation, etc.). The activities performed in this respect are discussed, and emphasis is also given to the relevance of the thermal losses to the environment. This issue affects particularly the small scaled facilities and has relevance on the scaling approach related to the power and volume of the facility.

  8. Availability of essential health services in post-conflict Liberia

    PubMed Central

    Rockers, Peter C; Williams, Elizabeth H; Varpilah, S Tornorlah; Macauley, Rose; Saydee, Geetor; Galea, Sandro

    2010-01-01

    Abstract Objective To assess the availability of essential health services in northern Liberia in 2008, five years after the end of the civil war. Methods We carried out a population-based household survey in rural Nimba county and a health facility survey in clinics and hospitals nearest to study villages. We evaluated access to facilities that provide index essential services: artemisinin combination therapy for malaria, integrated management of childhood illness, human immunodeficiency virus (HIV) counselling and testing, basic emergency obstetric care and treatment of mental illness. Findings Data were obtained from 1405 individuals (98% response rate) selected with a three-stage population-representative sampling method, and from 43 of Nimba county’s 49 health facilities selected because of proximity to the study villages. Respondents travelled an average of 136 minutes to reach a health facility. All respondents could access malaria treatment at the nearest facility and 55.9% could access HIV testing. Only 26.8%, 14.5%, and 12.1% could access emergency obstetric care, integrated management of child illness and mental health services, respectively. Conclusion Although there has been progress in providing basic services, rural Liberians still have limited access to life-saving health care. The reasons for the disparities in the services available to the population are technical and political. More frequently available services (HIV testing, malaria treatment) were less complex to implement and represented diseases favoured by bilateral and multilateral health sector donors. Systematic investments in the health system are required to ensure that health services respond to current and future health priorities. PMID:20616972

  9. A Method for Calculating the Probability of Successfully Completing a Rocket Propulsion Ground Test

    NASA Technical Reports Server (NTRS)

    Messer, Bradley P.

    2004-01-01

    Propulsion ground test facilities face the daily challenges of scheduling multiple customers into limited facility space and successfully completing their propulsion test projects. Due to budgetary and schedule constraints, NASA and industry customers are pushing to test more components, for less money, in a shorter period of time. As these new rocket engine component test programs are undertaken, the lack of technology maturity in the test articles, combined with pushing the test facilities capabilities to their limits, tends to lead to an increase in facility breakdowns and unsuccessful tests. Over the last five years Stennis Space Center's propulsion test facilities have performed hundreds of tests, collected thousands of seconds of test data, and broken numerous test facility and test article parts. While various initiatives have been implemented to provide better propulsion test techniques and improve the quality, reliability, and maintainability of goods and parts used in the propulsion test facilities, unexpected failures during testing still occur quite regularly due to the harsh environment in which the propulsion test facilities operate. Previous attempts at modeling the lifecycle of a propulsion component test project have met with little success. Each of the attempts suffered form incomplete or inconsistent data on which to base the models. By focusing on the actual test phase of the tests project rather than the formulation, design or construction phases of the test project, the quality and quantity of available data increases dramatically. A logistic regression model has been developed form the data collected over the last five years, allowing the probability of successfully completing a rocket propulsion component test to be calculated. A logistic regression model is a mathematical modeling approach that can be used to describe the relationship of several independent predictor variables X(sub 1), X(sub 2),..,X(sub k) to a binary or dichotomous dependent variable Y, where Y can only be one of two possible outcomes, in this case Success or Failure. Logistic regression has primarily been used in the fields of epidemiology and biomedical research, but lends itself to many other applications. As indicated the use of logistic regression is not new, however, modeling propulsion ground test facilities using logistic regression is both a new and unique application of the statistical technique. Results from the models provide project managers with insight and confidence into the affectivity of rocket engine component ground test projects. The initial success in modeling rocket propulsion ground test projects clears the way for more complex models to be developed in this area.

  10. Test Facilities Capability Handbook: Volume 1 - Stennis Space Center (SSC); Volume 2 - Marshall Space Flight Center (MSFC)

    NASA Technical Reports Server (NTRS)

    Hensarling, Paula L.

    2007-01-01

    The John C. Stennis Space Center (SSC) is located in Southern Mississippi near the Mississippi-Louisiana state line. SSC is chartered as the National Aeronautics and Space Administration (NASA) Center of Excellence for large space transportation propulsion system testing. This charter has led to many unique test facilities, capabilities and advanced technologies provided through the supporting infrastructure. SSC has conducted projects in support of such diverse activities as liquid, and hybrid rocket testing and development; material development; non-intrusive plume diagnostics; plume tracking; commercial remote sensing; test technology and more. On May 30, 1996 NASA designated SSC the lead center for rocket propulsion testing, giving the center total responsibility for conducting and/or managing all NASA rocket engine testing. Test services are now available not only for NASA but also for the Department of Defense, other government agencies, academia, and industry. This handbook was developed to provide a summary of the capabilities that exist within SSC. It is intended as a primary resource document, which will provide the reader with the top-level capabilities and characteristics of the numerous test facilities, test support facilities, laboratories, and services. Due to the nature of continually evolving programs and test technologies, descriptions of the Center's current capabilities are provided. Periodic updates and revisions of this document will be made to maintain its completeness and accuracy.

  11. Expanded Quality Management Using Information Power (EQUIP): protocol for a quasi-experimental study to improve maternal and newborn health in Tanzania and Uganda

    PubMed Central

    2014-01-01

    Background Maternal and newborn mortality remain unacceptably high in sub-Saharan Africa. Tanzania and Uganda are committed to reduce maternal and newborn mortality, but progress has been limited and many essential interventions are unavailable in primary and referral facilities. Quality management has the potential to overcome low implementation levels by assisting teams of health workers and others finding local solutions to problems in delivering quality care and the underutilization of health services by the community. Existing evidence of the effect of quality management on health worker performance in these contexts has important limitations, and the feasibility of expanding quality management to the community level is unknown. We aim to assess quality management at the district, facility, and community levels, supported by information from high-quality, continuous surveys, and report effects of the quality management intervention on the utilization and quality of services in Tanzania and Uganda. Methods In Uganda and Tanzania, the Expanded Quality Management Using Information Power (EQUIP) intervention is implemented in one intervention district and evaluated using a plausibility design with one non-randomly selected comparison district. The quality management approach is based on the collaborative model for improvement, in which groups of quality improvement teams test new implementation strategies (change ideas) and periodically meet to share results and identify the best strategies. The teams use locally-generated community and health facility data to monitor improvements. In addition, data from continuous health facility and household surveys are used to guide prioritization and decision making by quality improvement teams as well as for evaluation of the intervention. These data include input, process, output, coverage, implementation practice, and client satisfaction indicators in both intervention and comparison districts. Thus, intervention districts receive quality management and continuous surveys, and comparison districts-only continuous surveys. Discussion EQUIP is a district-scale, proof-of-concept study that evaluates a quality management approach for maternal and newborn health including communities, health facilities, and district health managers, supported by high-quality data from independent continuous household and health facility surveys. The study will generate robust evidence about the effectiveness of quality management and will inform future nationwide implementation approaches for health system strengthening in low-resource settings. Trial registration PACTR201311000681314 PMID:24690284

  12. Expanded Quality Management Using Information Power (EQUIP): protocol for a quasi-experimental study to improve maternal and newborn health in Tanzania and Uganda.

    PubMed

    Hanson, Claudia; Waiswa, Peter; Marchant, Tanya; Marx, Michael; Manzi, Fatuma; Mbaruku, Godfrey; Rowe, Alex; Tomson, Göran; Schellenberg, Joanna; Peterson, Stefan

    2014-04-02

    Maternal and newborn mortality remain unacceptably high in sub-Saharan Africa. Tanzania and Uganda are committed to reduce maternal and newborn mortality, but progress has been limited and many essential interventions are unavailable in primary and referral facilities. Quality management has the potential to overcome low implementation levels by assisting teams of health workers and others finding local solutions to problems in delivering quality care and the underutilization of health services by the community. Existing evidence of the effect of quality management on health worker performance in these contexts has important limitations, and the feasibility of expanding quality management to the community level is unknown. We aim to assess quality management at the district, facility, and community levels, supported by information from high-quality, continuous surveys, and report effects of the quality management intervention on the utilization and quality of services in Tanzania and Uganda. In Uganda and Tanzania, the Expanded Quality Management Using Information Power (EQUIP) intervention is implemented in one intervention district and evaluated using a plausibility design with one non-randomly selected comparison district. The quality management approach is based on the collaborative model for improvement, in which groups of quality improvement teams test new implementation strategies (change ideas) and periodically meet to share results and identify the best strategies. The teams use locally-generated community and health facility data to monitor improvements. In addition, data from continuous health facility and household surveys are used to guide prioritization and decision making by quality improvement teams as well as for evaluation of the intervention. These data include input, process, output, coverage, implementation practice, and client satisfaction indicators in both intervention and comparison districts. Thus, intervention districts receive quality management and continuous surveys, and comparison districts-only continuous surveys. EQUIP is a district-scale, proof-of-concept study that evaluates a quality management approach for maternal and newborn health including communities, health facilities, and district health managers, supported by high-quality data from independent continuous household and health facility surveys. The study will generate robust evidence about the effectiveness of quality management and will inform future nationwide implementation approaches for health system strengthening in low-resource settings. PACTR201311000681314.

  13. Returning HIV-1 viral load results to participant-selected health facilities in national Population-based HIV Impact Assessment (PHIA) household surveys in three sub-Saharan African Countries, 2015 to 2016.

    PubMed

    Saito, Suzue; Duong, Yen T; Metz, Melissa; Lee, Kiwon; Patel, Hetal; Sleeman, Katrina; Manjengwa, Julius; Ogollah, Francis M; Kasongo, Webster; Mitchell, Rick; Mugurungi, Owen; Chimbwandira, Frank; Moyo, Crispin; Maliwa, Vusumuzi; Mtengo, Helecks; Nkumbula, Tepa; Ndongmo, Clement B; Vere, Nora Skutayi; Chipungu, Geoffrey; Parekh, Bharat S; Justman, Jessica; Voetsch, Andrew C

    2017-11-01

    Logistical complexities of returning laboratory test results to participants have precluded most population-based HIV surveys conducted in sub-Saharan Africa from doing so. For HIV positive participants, this presents a missed opportunity for engagement into clinical care and improvement in health outcomes. The Population-based HIV Impact Assessment (PHIA) surveys, which measure HIV incidence and the prevalence of viral load (VL) suppression in selected African countries, are returning VL results to health facilities specified by each HIV positive participant within eight weeks of collection. We describe the performance of the specimen and data management systems used to return VL results to PHIA participants in Zimbabwe, Malawi and Zambia. Consenting participants underwent home-based counseling and HIV rapid testing as per national testing guidelines; all confirmed HIV positive participants had VL measured at a central laboratory on either the Roche CAP/CTM or Abbott m2000 platform. On a bi-weekly basis, a dedicated data management team produced logs linking the VL test result with the participants' contact information and preferred health facility; project staff sent test results confidentially via project drivers, national courier systems, or electronically through an adapted short message service (SMS). Participants who provided cell phone numbers received SMS or phone call alerts regarding availability of VL results. From 29,634 households across the three countries, 78,090 total participants 0 to 64 years in Zimbabwe and Malawi and 0 to 59 years in Zambia underwent blood draw and HIV testing. Of the 8391 total HIV positive participants identified, 8313 (99%) had VL tests performed and 8245 (99%) of these were returned to the selected health facilities. Of the 5979 VL results returned in Zimbabwe and Zambia, 85% were returned within the eight-week goal with a median turnaround time of 48 days (IQR: 33 to 61). In Malawi, where exact return dates were unavailable all 2266 returnable results reached the health facilities by 11 weeks. The first three PHIA surveys returned the vast majority of VL results to each HIV positive participant's preferred health facility within the eight-week target. Even in the absence of national VL monitoring systems, a system to return VL results from a population-based survey is feasible, but it requires developing laboratory and data management systems and dedicated staff. These are likely important requirements to strengthen return of results systems in routine clinical care. © 2017 The Authors. Journal of the International AIDS Society published by John Wiley & sons Ltd on behalf of the International AIDS Society.

  14. Hazardous Materials Verification and Limited Characterization Report on Sodium and Caustic Residuals in Materials and Fuel Complex Facilities MFC-799/799A

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gary Mecham

    2010-08-01

    This report is a companion to the Facilities Condition and Hazard Assessment for Materials and Fuel Complex Sodium Processing Facilities MFC-799/799A and Nuclear Calibration Laboratory MFC-770C (referred to as the Facilities Condition and Hazards Assessment). This report specifically responds to the requirement of Section 9.2, Item 6, of the Facilities Condition and Hazards Assessment to provide an updated assessment and verification of the residual hazardous materials remaining in the Sodium Processing Facilities processing system. The hazardous materials of concern are sodium and sodium hydroxide (caustic). The information supplied in this report supports the end-point objectives identified in the Transition Planmore » for Multiple Facilities at the Materials and Fuels Complex, Advanced Test Reactor, Central Facilities Area, and Power Burst Facility, as well as the deactivation and decommissioning critical decision milestone 1, as specified in U.S. Department of Energy Guide 413.3-8, “Environmental Management Cleanup Projects.” Using a tailored approach and based on information obtained through a combination of process knowledge, emergency management hazardous assessment documentation, and visual inspection, this report provides sufficient detail regarding the quantity of hazardous materials for the purposes of facility transfer; it also provides that further characterization/verification of these materials is unnecessary.« less

  15. Radon Measurement in Schools: Self-Paced Training Workbook.

    ERIC Educational Resources Information Center

    Institute for Disability Research and Training, Inc., Silver Spring, MD.

    This workbook is designed to educate school personnel in randon detection. The workbook is intended for an audience of school officials, including administrators, business officers, facility managers, and maintenance and operations staff. It is meant to provide trainees with experience in planning a radon test, interpreting test results,…

  16. 75 FR 33357 - Agency Information Collection Activities: Submission for the Office of Management and Budget (OMB...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-11

    ... or asked to report: Licensees and applicants for nuclear power plants and research and test... detailed review of applications for licenses and amendments thereto to construct and operate nuclear power plants, preliminary or final design approvals, design certifications, research and test facilities...

  17. Nevada Test Site Resource Management Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-12-01

    The Nevada Test Site (NTS) Resource Management Plan (RMP) describes the NTS Stewardship Mission and how its accomplishment will preserve the resources of the ecoregion while accomplishing the objectives of the mission. The NTS Stewardship Mission is to manage the land and facilities at the NTS as a unique and valuable national resource. The RMP has defined goals for twelve resource areas based on the principles of ecosystem management. These goals were established using an interdisciplinary team of DOE/NV resource specialists with input from surrounding land managers, private parties, and representatives of Native American governments. The overall goal of themore » RMP is to facilitate improved NTS land use management decisions within the Great Basin and Mojave Desert ecoregions.« less

  18. Development of a Work Control System for Propulsion Testing at NASA Stennis

    NASA Technical Reports Server (NTRS)

    Messer, Elizabeth A.

    2005-01-01

    In 1996 Stennis Space Center was given management authority for all Propulsion Testing for NASA. Over the next few years several research and development (R&D) test facilities were completed and brought up to full operation in what is known as the E-Complex Test Facility at Stennis Space Center. To construct, activate and operate these test facilities, a manual paper-based work control system was created. After utilizing this paper-based work control system for approximately three years, it became apparent that the research and development test area needed a better method to execute, monitor, and report on tasks required to further propulsion testing. The paper based system did not provide the engineers adequate visibility into work tasks or the tracking of testing or hardware discrepancies. This system also restricted the engineer s ability to utilize and access past knowledge and experiences given the severe schedule limitations for most R&D propulsion testing projects. Therefore a system was developed to meet the growing need of Test Operations called the Propulsion Test Directorate (PTD) Work Control System. This system is used to plan, perform, and track tasks that support testing and also to capture lessons learned while doing so.

  19. Facility Management's Role in Organizational Sustainability

    ERIC Educational Resources Information Center

    Adams, Gregory K.

    2013-01-01

    Facility managers have questions about sustainability. How do an organization's physical facilities--its built environment--and the management of them, influence the sustainability of the organization or institution as a whole? How important is Facility Management (FM) to the overall sustainability profile of an organization? Facility managers…

  20. 41 CFR 102-72.40 - What are facility management delegations?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What are facility management delegations? 102-72.40 Section 102-72.40 Public Contracts and Property Management Federal Property... AUTHORITY Delegation of Authority § 102-72.40 What are facility management delegations? Facility management...

  1. 41 CFR 102-74.270 - Are vehicles required to display parking permits in parking facilities?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Are vehicles required to... Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Parking Facilities § 102-74.270 Are vehicles required...

  2. 'As a clinician, you are not managing lab results, you are managing the patient': how the enactment of malaria at health facilities in Cameroon compares with new WHO guidelines for the use of malaria tests.

    PubMed

    Chandler, Clare I R; Mangham, Lindsay; Njei, Abanda Ngu; Achonduh, Olivia; Mbacham, Wilfred F; Wiseman, Virginia

    2012-05-01

    In response to widespread overuse of antimalarial drugs, the World Health Organisation changed guidelines in 2010 to restrict the use of antimalarials to parasitologically confirmed malaria cases. Malaria rapid diagnostic tests (RDTs) have been presented as a means to realize the new guidelines, and National Malaria Control Programmes, including that of Cameroon, are developing plans to introduce the tests to replace microscopy or clinical diagnosis at public health facilities across the country. We aimed to understand how malaria tests and antimalarial drugs are currently used as part of social interactions between health workers and patients at public and mission health facilities in Yaoundé and Bamenda and surrounding districts in the Northwest region of Cameroon. In May to June 2010, we held 17 focus group discussions with 146 health workers involved in clinical care from 49 health facilities. Clinicians enacted malaria as a 'juggling' exercise, involving attention to pathophysiology of the patient as well as their desires and medical reputations, utilising tests and medicines for their therapeutic effects as symbols in the process of care. Parasites were rarely mentioned in describing diagnostic decisions. These enactments of malaria contrast with evidence-based guidelines emanating from WHO, which assume the parasite is the central driver of practice. If RDTs are to be taken up in practice, public health practitioners need to pay careful attention to the values and priorities of health workers and patients if they are to work with them to improve diagnosis and treatment of febrile illnesses. Copyright © 2012 Elsevier Ltd. All rights reserved.

  3. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Willoner, T.; Turlington, R.; Koenig, R.

    The U.S. Department of Energy (DOE) (Environmental Management [EM], Office of Packaging and Transportation [EM-45]) Packaging and Certification Program (DOE PCP) has developed a Radio Frequency Identification (RFID) tracking and monitoring system, called ARG-US, for the management of nuclear materials packages during transportation and storage. The performance of the ARG-US RFID equipment and system has been fully tested in two demonstration projects in April 2008 and August 2009. With the strong support of DOE-SR and DOE PCP, a field testing program was completed in Savannah River Site's K-Area Material Storage (KAMS) Facility, an active Category I Plutonium Storage Facility, inmore » 2010. As the next step (Phase II) of continued vault testing for the ARG-US system, the Savannah River Site K Area Material Storage facility has placed the ARG-US RFIDs into the 910B storage vault for operational testing. This latest version (Mark III) of the Argonne RFID system now has the capability to measure radiation dose and dose rate. This paper will report field testing progress of the ARG-US RFID equipment in KAMS, the operability and reliability trend results associated with the applications of the system, and discuss the potential benefits in enhancing safety, security and materials accountability. The purpose of this Phase II K Area test is to verify the accuracy of the radiation monitoring and proper functionality of the ARG-US RFID equipment and system under a realistic environment in the KAMS facility. Deploying the ARG-US RFID system leads to a reduced need for manned surveillance and increased inventory periods by providing real-time access to status and event history traceability, including environmental condition monitoring and radiation monitoring. The successful completion of the testing program will provide field data to support a future development and testing. This will increase Operation efficiency and cost effectiveness for vault operation. As the next step (Phase II) of continued vault testing for the ARG-US system, the Savannah River Site K Area Material Storage facility has placed the ARG-US RFIDs into the 910B storage vault. Deploying the ARG-US RFID system lends to a reduced need for manned surveillance and increased inventory periods by providing real-time access to status and event history traceability, including radiation and environmental monitoring. The successful completion of the testing program will provide field data to support future development and testing.« less

  4. Meet EPA Scientist Jeff Szabo, Ph.D.

    EPA Pesticide Factsheets

    EPA scientist Jeff Szabo, Ph.D., has worked for the EPA’s National Homeland Security Research Center since 2005. He conducts and manages water security research projects at EPA’s Test and Evaluation facility.

  5. Nevada National Security Site Environmental Report Summary 2016

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wills, Cathy

    This document is a summary of the full 2016 Nevada National Security Site Environmental Report (NNSSER) prepared by the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/ NFO). This summary provides an abbreviated and more readable version of the full NNSSER. NNSA/NFO prepares the NNSSER to provide the public an understanding of the environmental monitoring and compliance activities that are conducted on the Nevada National Security Site (NNSS) to protect the public and the environment from radiation hazards and from potential nonradiological impacts. It is a comprehensive report of environmental activities performed at the NNSS andmore » offsite facilities over the previous calendar year. The NNSS is currently the nation’s unique site for ongoing national security–related missions and high-risk operations. The NNSS is located about 65 miles northwest of Las Vegas. The approximately 1,360-square-mile site is one of the largest restricted access areas in the United States. It is surrounded by federal installations with strictly controlled access as well as by lands that are open to public entry. In 2016, National Security Technologies, LLC (NSTec), was the NNSS Management and Operations Contractor accountable for ensuring work was performed in compliance with environmental regulations. NNSS activities in 2016 continued to be diverse, with the primary goal to ensure that the existing U.S. stockpile of nuclear weapons remains safe and reliable. Other activities included weapons of mass destruction first responder training; the controlled release of hazardous material at the Nonproliferation Test and Evaluation Complex (NPTEC); remediation of legacy contamination sites; characterization of waste destined for the Waste Isolation Pilot Plant in Carlsbad, New Mexico, or the Idaho National Laboratory in Idaho Falls, Idaho; disposal of low-level and mixed low-level radioactive waste; and environmental research. Facilities and centers that support the National Security/Defense mission include the U1a Facility, Big Explosives Experimental Facility (BEEF), Device Assembly Facility (DAF), National Criticality Experiments Research Center (NCERC) located in the DAF, Joint Actinide Shock Physics Experimental Research (JASPER) Facility, Dense Plasma Focus (DPF) Facility located in the Los Alamos Technical Facility (LATF), and the Radiological/ Nuclear Countermeasures Test and Evaluation Complex (RNCTEC). Facilities that support the Environmental Management mission include the Area 5 Radioactive Waste Management Complex (RWMC) and the Area 3 Radioactive Waste Management Site (RWMS), which has been in cold standby since 2006.« less

  6. Quality Assurance of Rapid Diagnostic Tests for Malaria in Routine Patient Care in Rural Tanzania

    PubMed Central

    McMorrow, Meredith L.; Masanja, M. Irene; Kahigwa, Elizeus; Abdulla, Salim M. K.; Kachur, S. Patrick

    2010-01-01

    Histidine-rich protein II (HRP2)-based malaria rapid diagnostic tests (RDTs) have shown high sensitivity and specificity for detecting Plasmodium falciparum malaria in a variety of study settings. However, RDTs are susceptible to heat and humidity and variation in individual performance, which may affect their use in field settings. We evaluated sensitivity and specificity of RDTs during routine use for malaria case management in peripheral health facilities. From December 2007 to October 2008, HRP2-based ParaHIT-f RDTs were introduced in 12 facilities without available microscopy in Rufiji District, Tanzania. Health workers received a single day of instruction on how to perform an RDT and thick blood smear. Job aids, Integrated Management of Childhood Illness guidelines, and national malaria treatment algorithms were reviewed. For quality assurance (QA), thick blood smears for reference microscopy were collected for 2 to 3 days per week from patients receiving RDTs; microscopy was not routinely performed at the health facilities. Slides were stained and read centrally within 72 hours of collection by a reference microscopist. When RDT and blood smear results were discordant, blood smears were read by additional reference microscopists blinded to earlier results. Facilities were supervised monthly by the district laboratory supervisor or a member of the study team. Ten thousand six hundred fifty (10,650) patients were tested with RDTs, and 51.5% (5,488/10,650) had a positive test result. Blood smear results were available for 3,914 patients, of whom 40.1% (1,577/3,914) were positive for P. falciparum malaria. Overall RDT sensitivity was 90.7% (range by facility 85.7–96.5%) and specificity was 73.5% (range 50.0–84.3%). Sensitivity increased with increasing parasite density. Successful implementation of RDTs was achieved in peripheral health facilities with adequate training and supervision. Quality assurance is essential to the adequate performance of any laboratory test. Centralized staining and reading of blood smears provided useful monitoring of RDT performance. However, this level of QA may not be sustainable nationwide. PMID:20065013

  7. ARES I-X Launch Prep

    NASA Image and Video Library

    2009-10-26

    Mission managers, from left, NASA Ares I-X Assistant Launch Director Pete Nickolenko, Ground Operations Manager Philip "Pepper" Phillips, Ares I-X Launch Director Ed Mango, and Constellation Program manager Jeff Hanley review the latest weather radar from Firing Room One of the Launch Control Center (LCC) at the Kennedy Space Center during the launch countdown of the Ares I-X rocket in Cape Canaveral, Fla., Tuesday, Oct. 27, 2009. The flight test of Ares I-X will provide NASA with an early opportunity to test and prove flight characteristics, hardware, facilities and ground operations associated with the Ares I. Photo Credit: (NASA/Bill Ingalls)

  8. 41 CFR 102-74.265 - Who must provide for the regulation and policing of parking facilities?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Who must provide for the... Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Parking Facilities § 102-74.265 Who must provide for...

  9. 41 CFR 102-74.55 - Are vending facilities authorized under the Randolph-Sheppard Act operated by permit or contract?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Are vending facilities... Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Concession Services § 102-74...

  10. KSC-2014-2642

    NASA Image and Video Library

    2014-05-21

    CAPE CANAVERAL, Fla. – Jon Olansen, Morpheus project manager, speaks to members of the media inside a facility near the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida. Behind Olansen is the Project Morpheus prototype lander. Project Morpheus tests NASA’s autonomous landing and hazard avoidance technology, or ALHAT, sensors and an engine that runs on liquid oxygen and methane, which are green propellants. These new capabilities could be used in future efforts to deliver cargo to planetary surfaces. The landing facility provides the lander with the kind of field necessary for realistic testing, complete with rocks, craters and hazards to avoid. Morpheus’ ALHAT payload allows it to navigate to clear landing sites amidst rocks, craters and other hazards during its descent. Project Morpheus is being managed under the Advanced Exploration Systems, or AES, Division in NASA’s Human Exploration and Operations Mission Directorate. The efforts in AES pioneer new approaches for rapidly developing prototype systems, demonstrating key capabilities and validating operational concepts for future human missions beyond Earth orbit. For more information on Project Morpheus, visit http://morpheuslander.jsc.nasa.gov/. Photo credit: NASA/Frankie Martin

  11. KSC-2014-2641

    NASA Image and Video Library

    2014-05-21

    CAPE CANAVERAL, Fla. – Jon Olansen, Morpheus project manager, speaks to members of the media inside a facility near the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida. Behind Olansen is the Project Morpheus prototype lander. Project Morpheus tests NASA’s autonomous landing and hazard avoidance technology, or ALHAT, sensors and an engine that runs on liquid oxygen and methane, which are green propellants. These new capabilities could be used in future efforts to deliver cargo to planetary surfaces. The landing facility provides the lander with the kind of field necessary for realistic testing, complete with rocks, craters and hazards to avoid. Morpheus’ ALHAT payload allows it to navigate to clear landing sites amidst rocks, craters and other hazards during its descent. Project Morpheus is being managed under the Advanced Exploration Systems, or AES, Division in NASA’s Human Exploration and Operations Mission Directorate. The efforts in AES pioneer new approaches for rapidly developing prototype systems, demonstrating key capabilities and validating operational concepts for future human missions beyond Earth orbit. For more information on Project Morpheus, visit http://morpheuslander.jsc.nasa.gov/. Photo credit: NASA/Frankie Martin

  12. KSC-2014-2643

    NASA Image and Video Library

    2014-05-21

    CAPE CANAVERAL, Fla. – Chirold Epp, the Autonomous Landing and Hazard Avoidance Technology, or ALHAT, project manager, speaks to members of the media inside a facility near the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida. Behind Epp is the Project Morpheus prototype lander. Project Morpheus tests NASA’s ALHAT sensors and an engine that runs on liquid oxygen and methane, which are green propellants. These new capabilities could be used in future efforts to deliver cargo to planetary surfaces. The landing facility provides the lander with the kind of field necessary for realistic testing, complete with rocks, craters and hazards to avoid. Morpheus’ ALHAT payload allows it to navigate to clear landing sites amidst rocks, craters and other hazards during its descent. Project Morpheus is being managed under the Advanced Exploration Systems, or AES, Division in NASA’s Human Exploration and Operations Mission Directorate. The efforts in AES pioneer new approaches for rapidly developing prototype systems, demonstrating key capabilities and validating operational concepts for future human missions beyond Earth orbit. For more information on Project Morpheus, visit http://morpheuslander.jsc.nasa.gov/. Photo credit: NASA/Frankie Martin

  13. Final safety analysis report for the Ground Test Accelerator (GTA), Phase 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1994-10-01

    This document is the second volume of a 3 volume safety analysis report on the Ground Test Accelerator (GTA). The GTA program at the Los Alamos National Laboratory (LANL) is the major element of the national Neutral Particle Beam (NPB) program, which is supported by the Strategic Defense Initiative Office (SDIO). A principal goal of the national NPB program is to assess the feasibility of using hydrogen and deuterium neutral particle beams outside the Earth`s atmosphere. The main effort of the NPB program at Los Alamos concentrates on developing the GTA. The GTA is classified as a low-hazard facility, exceptmore » for the cryogenic-cooling system, which is classified as a moderate-hazard facility. This volume consists of failure modes and effects analysis; accident analysis; operational safety requirements; quality assurance program; ES&H management program; environmental, safety, and health systems critical to safety; summary of waste-management program; environmental monitoring program; facility expansion, decontamination, and decommissioning; summary of emergency response plan; summary plan for employee training; summary plan for operating procedures; glossary; and appendices A and B.« less

  14. Wave Energy Research, Testing and Demonstration Center

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Batten, Belinda

    2014-09-30

    The purpose of this project was to build upon the research, development and testing experience of the Northwest National Marine Renewable Energy Center (NNMREC) to establish a non-grid connected open-ocean testing facility for wave energy converters (WECs) off the coast of Newport, Oregon. The test facility would serve as the first facility of its kind in the continental US with a fully energetic wave resource where WEC technologies could be proven for west coast US markets. The test facility would provide the opportunity for self-contained WEC testing or WEC testing connected via an umbilical cable to a mobile ocean testmore » berth (MOTB). The MOTB would act as a “grid surrogate” measuring energy produced by the WEC and the environmental conditions under which the energy was produced. In order to realize this vision, the ocean site would need to be identified through outreach to community stakeholders, and then regulatory and permitting processes would be undertaken. Part of those processes would require environmental baseline studies and site analysis, including benthic, acoustic and wave resource characterization. The MOTB and its myriad systems would need to be designed and constructed.The first WEC test at the facility with the MOTB was completed within this project with the WET-NZ device in summer 2012. In summer 2013, the MOTB was deployed with load cells on its mooring lines to characterize forces on mooring systems in a variety of sea states. Throughout both testing seasons, studies were done to analyze environmental effects during testing operations. Test protocols and best management practices for open ocean operations were developed. As a result of this project, the non-grid connected fully energetic WEC test facility is operational, and the MOTB system developed provides a portable concept for WEC testing. The permitting process used provides a model for other wave energy projects, especially those in the Pacific Northwest that have similar environmental considerations. While the non-grid connected testing facility provides an option for WEC developers to prove their technology in a fully-energetic wave environment, the absence of grid connection is somewhat of a limitation. To prove that their technology is commercially viable, developers seek a multi-year grid connected testing option. To address this need, NNMREC is developing a companion grid connected test facility in Newport, Oregon, where small arrays of WECs can be tested as well.« less

  15. EMPTAC (Electromagnetic Pulse Test Aircraft) user's guide

    NASA Astrophysics Data System (ADS)

    Cleaveland, Dale R.; Burkhard, Avery

    1988-04-01

    This guide was established to give test managers a way to familiarize themselves with the Air Force Weapons Laboratory's electromagnetic pulse (EMP) test aircraft program located at Kirtland Air Force Base (KAFB), New Mexico. Brief descriptions of the available EMP test facilities at KAFB are also included. This guide should give prospective customers (users) adequate information to scope the magnitude of their test effort and to accomplish general planning without extensive involvement in test execution details.

  16. Assessment of hypertension management in primary health care settings in Kinshasa, Democratic Republic of Congo.

    PubMed

    Lulebo, Aimée M; Mapatano, Mala A; Kayembe, Patrick K; Mafuta, Eric M; Mutombo, Paulin B; Coppieters, Yves

    2015-12-24

    Hypertension-related complications have become more diagnosed at secondary and tertiary care levels, in the Democratic Republic of the Congo (DRC), probably indicative of poor management of hypertensive patients at primary health care level. This study aimed to assess the management of hypertension in primary health care settings by using guidelines of the International Forum for Prevention and Control of HTN in Africa (IFHA). A multi-center cross-sectional study was carried out in primary health care settings. A total of 102 nurses were surveyed using a structured interview. Mean and proportion comparisons were performed using the t Student test and the Chi-square test respectively. The Kinshasa Primary Health Care network facilities were compared with non-Kinshasa Primary Health Care network facilities. From the 102 nurses surveyed; 52.9% were female with a mean age of 41.1, (SD = 10) years, merely 9.5% benefited from in-job training on cardiovascular diseases or their risk factors, and 51.7% had guidelines on the management of hypertension. Less than a quarter of the nurses knew the cut-off values of hypertension, diabetes and obesity. Merely 14.7% knew the therapeutic goals for uncomplicated hypertension. Several of the indicators for immediate referral recommended by IFHA were unmentioned. The content of patient education was lacking, avoiding stress being the best advice provided to hypertensive patients. The antihypertensive most used were unlikely to be recommended by the IFHA. This study showed a considerable gap of knowledge and practices in the management of hypertensive patients at primary health care facilities in Kinshasa pertaining to the IFHA guidelines. We think that task-shifting for management of hypertension is feasible if appropriate guidelines are provided and nurses trained.

  17. KENNEDY SPACE CENTER, FLA. - On a tour of the KSC Beach Corrosion Test Site, Testbed Manager Louis MacDowell (right) explains to Center Director Jim Kennedy about the test blocks being used to test a newly developed coating to protect steel inside concrete. Between MacDowell and Kennedy are Dr. Paul Hintze and Lead Scientist Dr. Luz Marina Calle. The KSC Beach Corrosion Test Site was established in the 1960s and has provided more than 30 years of historical information on the long-term performance of many materials in use at KSC and other locations around the world. Located 100 feet from the Atlantic Ocean approximately 1 mile south of the Space Shuttle launch sites, the test facility includes an atmospheric exposure site, a flowing seawater exposure site, and an on-site electrochemistry laboratory and monitoring station. The beach laboratory is used to conduct real-time corrosion experiments and provides for the remote monitoring of surrounding weather conditions. The newly added flowing seawater immersion facility provides for the immersion testing of materials and devices under controlled conditions.

    NASA Image and Video Library

    2003-08-21

    KENNEDY SPACE CENTER, FLA. - On a tour of the KSC Beach Corrosion Test Site, Testbed Manager Louis MacDowell (right) explains to Center Director Jim Kennedy about the test blocks being used to test a newly developed coating to protect steel inside concrete. Between MacDowell and Kennedy are Dr. Paul Hintze and Lead Scientist Dr. Luz Marina Calle. The KSC Beach Corrosion Test Site was established in the 1960s and has provided more than 30 years of historical information on the long-term performance of many materials in use at KSC and other locations around the world. Located 100 feet from the Atlantic Ocean approximately 1 mile south of the Space Shuttle launch sites, the test facility includes an atmospheric exposure site, a flowing seawater exposure site, and an on-site electrochemistry laboratory and monitoring station. The beach laboratory is used to conduct real-time corrosion experiments and provides for the remote monitoring of surrounding weather conditions. The newly added flowing seawater immersion facility provides for the immersion testing of materials and devices under controlled conditions.

  18. A Comprehensive Approach to Management of Workplace and Environmental Noise at NASA Lewis Research Center

    NASA Technical Reports Server (NTRS)

    Cooper, Beth A.

    1995-01-01

    NASA Lewis Research Center is home to more than 100 experimental research testing facilities and laboratories, including large wind tunnels and engine test cells, which in combination create a varied and complex noise environment. Much of the equipment was manufactured prior to the enactment of legislation limiting product noise emissions or occupational noise exposure. Routine facility maintenance and associated construction also contributes to a noise exposure management responsibility which is equal in magnitude and scope to that of several small industrial companies. The Noise Program, centrally managed within the Office of Environmental Programs at LRC, maintains overall responsibility for hearing conservation, community noise control, and acoustical and noise control engineering. Centralized management of the LRC Noise Program facilitates the timely development and implementation of engineered noise control solutions for problems identified via either the Hearing Conservation of Community Noise Program. The key element of the Lewis Research Center Noise Program, Acoustical and Noise Control Engineering Services, is focused on developing solutions that permanently reduce employee and community noise exposure and maximize research productivity by reducing or eliminating administrative and operational controls and by improving the safety and comfort of the work environment. The Hearing Conservation Program provides noise exposure assessment, medical monitoring, and training for civil servant and contractor employees. The Community Noise Program aims to maintain the support of LRC's neighboring communities while enabling necessary research operations to accomplish their programmatic goals. Noise control engineering capability resides within the Noise Program. The noise control engineering, based on specific exposure limits, is a fundamental consideration throughout the design phase of new test facilities, labs, and office buildings. In summary, the Noise Program addresses hearing conservation, community noise control, and acoustical and noise control engineering.

  19. 41 CFR 102-192.135 - Must we have a mail center manager at our facility?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... center manager at our facility? 102-192.135 Section 102-192.135 Public Contracts and Property Management... PROGRAMS 192-MAIL MANAGEMENT Mail Center Manager Requirements § 102-192.135 Must we have a mail center manager at our facility? Yes, every facility that has more than two full time people dedicated to...

  20. 41 CFR 102-74.585 - What Federal facility telework policy must Executive agencies follow?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What Federal facility... Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Telework § 102-74.585 What Federal facility telework policy must Executive...

  1. Estimating earthquake-induced failure probability and downtime of critical facilities.

    PubMed

    Porter, Keith; Ramer, Kyle

    2012-01-01

    Fault trees have long been used to estimate failure risk in earthquakes, especially for nuclear power plants (NPPs). One interesting application is that one can assess and manage the probability that two facilities - a primary and backup - would be simultaneously rendered inoperative in a single earthquake. Another is that one can calculate the probabilistic time required to restore a facility to functionality, and the probability that, during any given planning period, the facility would be rendered inoperative for any specified duration. A large new peer-reviewed library of component damageability and repair-time data for the first time enables fault trees to be used to calculate the seismic risk of operational failure and downtime for a wide variety of buildings other than NPPs. With the new library, seismic risk of both the failure probability and probabilistic downtime can be assessed and managed, considering the facility's unique combination of structural and non-structural components, their seismic installation conditions, and the other systems on which the facility relies. An example is offered of real computer data centres operated by a California utility. The fault trees were created and tested in collaboration with utility operators, and the failure probability and downtime results validated in several ways.

  2. Application Of Artificial Intelligence To Wind Tunnels

    NASA Technical Reports Server (NTRS)

    Lo, Ching F.; Steinle, Frank W., Jr.

    1989-01-01

    Report discusses potential use of artificial-intelligence systems to manage wind-tunnel test facilities at Ames Research Center. One of goals of program to obtain experimental data of better quality and otherwise generally increase productivity of facilities. Another goal to increase efficiency and expertise of current personnel and to retain expertise of former personnel. Third goal to increase effectiveness of management through more efficient use of accumulated data. System used to improve schedules of operation and maintenance of tunnels and other equipment, assignment of personnel, distribution of electrical power, and analysis of costs and productivity. Several commercial artificial-intelligence computer programs discussed as possible candidates for use.

  3. Evaluation of high-voltage, high-power, solid-state remote power controllers for amps

    NASA Technical Reports Server (NTRS)

    Callis, Charles P.

    1987-01-01

    The Electrical Power Branch at Marshall Space Flight Center has a Power System Development Facility where various power circuit breadboards are tested and evaluated. This project relates to the evaluation of a particular remote power controller (RPC) energizing high power loads. The Facility equipment permits the thorough testing and evaluation of high-voltage, high-power solid-state remote power controllers. The purpose is to evaluate a Type E, 30 Ampere, 200 V dc remote power controller. Three phases of the RPC evaluation are presented. The RPC is evaluated within a low-voltage, low-power circuit to check its operational capability. The RPC is then evaluated while performing switch/circuit breaker functions within a 200 V dc, 30 Ampere power circuit. The final effort of the project relates to the recommended procedures for installing these RPC's into the existing Autonomously Managed Power System (AMPS) breadboard/test facility at MSFC.

  4. Measuring Quality Gaps in TB Screening in South Africa Using Standardised Patient Analysis

    PubMed Central

    Christian, Carmen S.; Gerdtham, Ulf-G.; Hompashe, Dumisani; Smith, Anja; Burger, Ronelle

    2018-01-01

    This is the first multi-district Standardised Patient (SP) study in South Africa. It measures the quality of TB screening at primary healthcare (PHC) facilities. We hypothesise that TB screening protocols and best practices are poorly adhered to at the PHC level. The SP method allows researchers to observe how healthcare providers identify, test and advise presumptive TB patients, and whether this aligns with clinical protocols and best practice. The study was conducted at PHC facilities in two provinces and 143 interactions at 39 facilities were analysed. Only 43% of interactions resulted in SPs receiving a TB sputum test and being offered an HIV test. TB sputum tests were conducted routinely (84%) while HIV tests were offered less frequently (47%). Nurses frequently neglected to ask SPs whether their household contacts had confirmed TB (54%). Antibiotics were prescribed without taking temperatures in 8% of cases. The importance of returning to the facility to receive TB test results was only explained in 28%. The SP method has highlighted gaps in clinical practice, signalling missed opportunities. Early detection of sub-optimal TB care is instrumental in decreasing TB-related morbidity and mortality. The findings provide the rationale for further quality improvement work in TB management. PMID:29649095

  5. Priority setting and the ethics of resource allocation within VA healthcare facilities: results of a survey.

    PubMed

    Foglia, Mary Beth; Pearlman, Robert A; Bottrell, Melissa M; Altemose, Jane A; Fox, Ellen

    2008-01-01

    Setting priorities and the subsequent allocation of resources is a major ethical issue facing healthcare facilities, including the Veterans Health Administration (VHA), the largest integrated healthcare delivery network in the United States. Yet despite the importance of priority setting and its impact on those who receive and those who provide care, we know relatively little about how clinicians and managers view allocation processes within their facilities. The purpose of this secondary analysis of survey data was to characterize staff members' perceptions regarding the fairness of healthcare ethics practices related to resource allocation in Veterans Administration (VA) facilities. The specific aim of the study was to compare the responses of clinicians, clinician managers, and non-clinician managers with respect to these survey items. We utilized a paper and web-based survey and a cross-sectional design of VHA clinicians and managers. Our sample consisted of a purposive stratified sample of 109 managers and a stratified random sample of 269 clinicians employed 20 or more hours per week in one of four VA medical centers. The four medical centers were participating as field sites selected to test the logistics of administering and reporting results of the Integrated Ethics Staff Survey, an assessment tool aimed at characterizing a broad range of ethical practices within a healthcare organization. In general, clinicians were more critical than clinician managers or non-clinician managers of the institutions' allocation processes and of the impact of resource decisions on patient care. Clinicians commonly reported that they did not (a) understand their facility's decision-making processes, (b) receive explanations from management regarding the reasons behind important allocation decisions, or (b) perceive that they were influential in allocation decisions. In addition, clinicians and managers both perceived that education related to the ethics of resource allocation was insufficient and that their facilities could increase their effectiveness in identifying and resolving ethical problems related to resource allocation. How well a healthcare facility ensures fairness in the way it allocates its resources across programs and services depends on multiple factors, including awareness by decision makers that setting priorities and allocating resources is a moral enterprise (moral awareness), the availability of a consistent process that includes important stakeholder groups (procedural justice), and concurrence by stakeholders that decisions represent outcomes that fairly balance competing interests and have a positive net effect on the quality of care (distributive justice). In this study, clinicians and managers alike identified the need for improvement in healthcare ethics practices related to resource allocation.

  6. Urban Rail Supporting Technology Program Fiscal Year 1975 - Year End Summary

    DOT National Transportation Integrated Search

    1975-12-01

    The Urban Rail Supporting Technology Program is described for the 1975 fiscal year period. Important areas include program management, technical support and applications engineering, facilities development, test and evaluation, and technology develop...

  7. Microgrids | Energy Systems Integration Facility | NREL

    Science.gov Websites

    Manager, Marine Corps Air Station (MCAS) Miramar Network Simulator-in-the-Loop Testing OMNeT++: simulates a network and links with real computers and virtual hosts. Power Hardware-in-the-Loop Simulation

  8. Conducting Closed Habitation Experiments: Experience from the Lunar Mars Life Support Test Project

    NASA Technical Reports Server (NTRS)

    Barta, Daniel J.; Edeen, Marybeth A.; Henninger, Donald L.

    2004-01-01

    The Lunar-Mars Life Support Test Project (LMLSTP) was conducted from 1995 through 1997 at the National Aeronautics and Space Administration s (NASA) Johnson Space Center (JSC) to demonstrate increasingly longer duration operation of integrated, closed-loop life support systems that employed biological and physicochemical techniques for water recycling, waste processing, air revitalization, thermal control, and food production. An analog environment for long-duration human space travel, the conditions of isolation and confinement also enabled studies of human factors, medical sciences (both physiology and psychology) and crew training. Four tests were conducted, Phases I, II, IIa and III, with durations of 15, 30,60 and 91 days, respectively. The first phase focused on biological air regeneration, using wheat to generate enough oxygen for one experimental subject. The systems demonstrated in the later phases were increasingly complex and interdependent, and provided life support for four crew members. The tests were conducted using two human-rated, atmospherically-closed test chambers, the Variable Pressure Growth Chamber (VPGC) and the Integrated Life Support Systems Test Facility (ILSSTF). Systems included test articles (the life support hardware under evaluation), human accommodations (living quarters, kitchen, exercise equipment, etc.) and facility systems (emergency matrix system, power, cooling, etc.). The test team was managed by a lead engineer and a test director, and included test article engineers responsible for specific systems, subsystems or test articles, test conductors, facility engineers, chamber operators and engineering technicians, medical and safety officers, and science experimenters. A crew selection committee, comprised of psychologists, engineers and managers involved in the test, evaluated male and female volunteers who applied to be test subjects. Selection was based on the skills mix anticipated for each particular test, and utilized information from psychological and medical testing, data on the knowledge, experience and skills of the applicants, and team building exercises. The design, development, buildup and operation of test hardware and documentation followed the established NASA processes and requirements for test buildup and operation.

  9. Conducting Closed Habitation Experiments: Experience from the Lunar Mars Life Support Test Project

    NASA Technical Reports Server (NTRS)

    Barta, Daniel J.; Edeen, Marybeth A.; Henninger, Donald L.

    2006-01-01

    The Lunar-Mars Life Support Test Project (LMLSTP) was conducted from 1995 through 1997 at the National Aeronautics and Space Administration s (NASA) Johnson Space Center (JSC) to demonstrate increasingly longer duration operation of integrated, closed-loop life support systems that employed biological and physicochemical techniques for water recycling, waste processing, air revitalization, thermal control, and food production. An analog environment for long-duration human space travel, the conditions of isolation and confinement also enabled studies of human factors, medical sciences (both physiology and psychology) and crew training. Four tests were conducted, Phases I, II, IIa and III, with durations of 15, 30, 60 and 91 days, respectively. The first phase focused on biological air regeneration, using wheat to generate enough oxygen for one experimental subject. The systems demonstrated in the later phases were increasingly complex and interdependent, and provided life support for four crew members. The tests were conducted using two human-rated, atmospherically-closed test chambers, the Variable Pressure Growth Chamber (VPGC) and the Integrated Life Support Systems Test Facility (ILSSTF). Systems included test articles (the life support hardware under evaluation), human accommodations (living quarters, kitchen, exercise equipment, etc.) and facility systems (emergency matrix system, power, cooling, etc.). The test team was managed by a lead engineer and a test director, and included test article engineers responsible for specific systems, subsystems or test articles, test conductors, facility engineers, chamber operators and engineering technicians, medical and safety officers, and science experimenters. A crew selection committee, comprised of psychologists, engineers and managers involved in the test, evaluated male and female volunteers who applied to be test subjects. Selection was based on the skills mix anticipated for each particular test, and utilized information from psychological and medical testing, data on the knowledge, experience and skills of the applicants, and team building exercises. The design, development, buildup and operation of test hardware and documentation followed the established NASA processes and requirements for test buildup and operation.

  10. 14 CFR Appendix E to Part 60 - Qualification Performance Standards for Quality Management Systems for Flight Simulation Training...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... conducted more frequently if warranted. End QPS Requirements Begin Information g. An example of a segment..., scheduling and conducting tests or inspections, functional preflight checks) but retain the responsibility... following: (a) A maintenance facility that provides suitable FSTD hardware and software tests and...

  11. 14 CFR Appendix E to Part 60 - Qualification Performance Standards for Quality Management Systems for Flight Simulation Training...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... conducted more frequently if warranted. End QPS Requirements Begin Information g. An example of a segment..., scheduling and conducting tests or inspections, functional preflight checks) but retain the responsibility... following: (a) A maintenance facility that provides suitable FSTD hardware and software tests and...

  12. 75 FR 11915 - Chrysler, LLC, Sterling Heights Vehicle Test Center, Including On-Site Leased Workers From...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-12

    ... DEPARTMENT OF LABOR Employment and Training Administration [TA-W-65,672] Chrysler, LLC, Sterling Heights Vehicle Test Center, Including On-Site Leased Workers From Caravan Knight Facilities Management LLC; Sterling Heights, MI; Amended Certification Regarding Eligibility To Apply for Worker Adjustment Assistance and Alternative Trade Adjustment...

  13. Environmental scanning as a moderator of strategy-performance relationships: an empirical analysis of physical therapy facilities.

    PubMed

    Davis, Mark A; Miles, Grant; McDowell, William C

    2008-05-01

    To date, strategic management research in health care is largely confined to the acute care sector of the industry. This research examines the linkages among environmental scanning, competitive strategy and performance in physical therapy facilities. Nontrivial differences between acute and subacute care firms suggest the role of environmental scanning may change in non-acute care settings. Consistent with previous research, these results indicate that the frequency of internal and external scanning is related to the strategic orientation of physical therapy facilities. Contrary to the expectations, broader scope of scanning is positively related to an increasing market-focused and increasing efficiency strategic orientation. A key objective of the research is to test the impact of strategy/scanning alignment on facility performance. These findings support predictions on the moderating role of scanning activities in the strategy-performance relationship. However, a paradoxical pattern of results has possible implications for clinician managers in subacute care settings as well as the interpretation of scanning activities.

  14. Environmental technology demonstrations involving explosives contamination at the Volunteer Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Walker, A.J.; Broder, M.F.; Jayne, E.A.

    1997-08-01

    Managed by the US Army Environmental Center, the Army`s test site at Volunteer Army Ammunition Plant encompasses a 300-acre area formerly used for batch production of TNT. Soil and groundwater contamination in the test area is well characterized. A network of monitoring wells and detailed information regarding the volume, location, and concentration of soil contamination is available to potential demonstrators. On-site field and laboratory support is provided by ICI Americas Incorporated, the facility`s operator. Four demonstrations have been conducted at the test site and several are scheduled for 1997. Preliminary findings from the four demonstrations discussed will be available sometimemore » in 1997.« less

  15. 41 CFR 102-74.310 - What measures must Federal agencies take to improve the utilization of parking facilities?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Parking Facilities... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What measures must Federal agencies take to improve the utilization of parking facilities? 102-74.310 Section 102-74.310...

  16. Computer-Aided Facilities Management Systems (CAFM).

    ERIC Educational Resources Information Center

    Cyros, Kreon L.

    Computer-aided facilities management (CAFM) refers to a collection of software used with increasing frequency by facilities managers. The six major CAFM components are discussed with respect to their usefulness and popularity in facilities management applications: (1) computer-aided design; (2) computer-aided engineering; (3) decision support…

  17. Improving Tanzanian childbirth service quality.

    PubMed

    Jaribu, Jennie; Penfold, Suzanne; Green, Cathy; Manzi, Fatuma; Schellenberg, Joanna

    2018-04-16

    Purpose The purpose of this paper is to describe a quality improvement (QI) intervention in primary health facilities providing childbirth care in rural Southern Tanzania. Design/methodology/approach A QI collaborative model involving district managers and health facility staff was piloted for 6 months in 4 health facilities in Mtwara Rural district and implemented for 18 months in 23 primary health facilities in Ruangwa district. The model brings together healthcare providers from different health facilities in interactive workshops by: applying QI methods to generate and test change ideas in their own facilities; using local data to monitor improvement and decision making; and health facility supervision visits by project and district mentors. The topics for improving childbirth were deliveries and partographs. Findings Median monthly deliveries increased in 4 months from 38 (IQR 37-40) to 65 (IQR 53-71) in Mtwara Rural district, and in 17 months in Ruangwa district from 110 (IQR 103-125) to 161 (IQR 148-174). In Ruangwa health facilities, the women for whom partographs were used to monitor labour progress increased from 10 to 57 per cent in 17 months. Research limitations/implications The time for QI innovation, testing and implementation phases was limited, and the study only looked at trends. The outcomes were limited to process rather than health outcome measures. Originality/value Healthcare providers became confident in the QI method through engagement, generating and testing their own change ideas, and observing improvements. The findings suggest that implementing a QI initiative is feasible in rural, low-income settings.

  18. Feasibility study of a pressure-fed engine for a water recoverable space shuttle booster. Volume 3, part 1: Program acquisition planning

    NASA Technical Reports Server (NTRS)

    Olsen, C. D.

    1972-01-01

    Planning documentation is presented covering the specific areas of project engineering and development, management, facilities, manufacturing, logistic support maintenance, and test and product assurance.

  19. Web Site Development Support

    NASA Technical Reports Server (NTRS)

    Abdul, Hameed

    2016-01-01

    This summer I assisted the RPT Program Office in developing a design plan to update their existing website to current NASA web standards. The finished website is intended for the general public, specifically potential customers interested in learning about NASA's chemical rocket test facility capabilities and test assignment process. The goal of the website is to give the public insight about the purpose and function of the RPT Program. Working on this project gave me the opportunity to learn skills necessary for effective project management. The RPT Program Office manages numerous facilities so they are required to travel often to other sites for meetings throughout the year. Maneuvering around the travel schedule of the office and the workload priority of the IT Department proved to be quite the challenge. I overcame the travel schedule of the office by frequently communicating and checking in with my mentor via email and telephone.

  20. Space station dynamics, attitude control and momentum management

    NASA Technical Reports Server (NTRS)

    Sunkel, John W.; Singh, Ramen P.; Vengopal, Ravi

    1989-01-01

    The Space Station Attitude Control System software test-bed provides a rigorous environment for the design, development and functional verification of GN and C algorithms and software. The approach taken for the simulation of the vehicle dynamics and environmental models using a computationally efficient algorithm is discussed. The simulation includes capabilities for docking/berthing dynamics, prescribed motion dynamics associated with the Mobile Remote Manipulator System (MRMS) and microgravity disturbances. The vehicle dynamics module interfaces with the test-bed through the central Communicator facility which is in turn driven by the Station Control Simulator (SCS) Executive. The Communicator addresses issues such as the interface between the discrete flight software and the continuous vehicle dynamics, and multi-programming aspects such as the complex flow of control in real-time programs. Combined with the flight software and redundancy management modules, the facility provides a flexible, user-oriented simulation platform.

  1. Chemical, biological, and DNA markers for tracing slaughterhouse effluent.

    PubMed

    Harvey, P J; Taylor, M P; Handley, H K; Foster, S; Gillings, M R; Asher, A J

    2017-07-01

    Agricultural practices, if not managed correctly, can have a negative impact on receiving environments via waste disposal and discharge. In this study, a chicken slaughter facility on the rural outskirts of Sydney, Australia, has been identified as a possible source of persistent effluent discharge into a peri-urban catchment. Questions surrounding the facility's environmental management practices go back more than four decades. Despite there having never been a definitive determination of the facility's impact on local stream water quality, the New South Wales Environment Protection Authority (NSW EPA) has implemented numerous pollution reduction requirements to manage noise and water pollution at the slaughter facility. However, assessment of compliance remains complicated by potential additional sources of pollution in the catchment. To unravel this long-standing conundrum related to water pollution we apply a forensic, multiple lines of evidence approach to delineate the origin of the likely pollution source(s). Water samples collected between 2014 and 2016 from irrigation pipes and a watercourse exiting the slaughter facility had elevated concentrations of ammonia (max: 63,000µg/L), nitrogen (max: 67,000µg/L) and phosphorus (max: 39,000µg/L), which were significantly higher than samples from adjacent streams that did not receive direct runoff from the facility. Arsenic, sometimes utilised in growth promoting compounds, was detected in water discharging from the facility up to ~4 times (max 3.84µg/L) local background values (<0.5µg/L), with inorganic As (∑V+III) being the dominant species. The spatial association of elevated water pollution to the facility could not unequivocally distinguish a source and consequently DNA analysis of a suspected pollution discharge event was undertaken. Analysis of catchment runoff from several local streams showed that only water sampled at the downstream boundary of the facility tested positive for chicken DNA, with traces of duck DNA being absent, which was a potential confounder given that wild ducks are present in the area. Further, PCR analysis showed that only the discharge water emanating from the slaughter facility tested positive for a generalized marker of anthropogenic pollution, the clinical class 1 integron-integrase gene. The environmental data collected over a three-year period demonstrates that the slaughter facility is indisputably the primary source of water-borne pollution in the catchment. Moreover, application of DNA and PCR for confirming pollution sources demonstrates its potential for application by regulators in fingerprinting pollution sources. Copyright © 2017 Elsevier Inc. All rights reserved.

  2. Optical mass memory system (AMM-13). AMM/DBMS interface control document

    NASA Technical Reports Server (NTRS)

    Bailey, G. A.

    1980-01-01

    The baseline for external interfaces of a 10 to the 13th power bit, optical archival mass memory system (AMM-13) is established. The types of interfaces addressed include data transfer; AMM-13, Data Base Management System, NASA End-to-End Data System computer interconnect; data/control input and output interfaces; test input data source; file management; and facilities interface.

  3. Life-Cycle Assessments of Selected NASA Ground-Based Test Facilities

    NASA Technical Reports Server (NTRS)

    Sydnor, George Honeycutt

    2012-01-01

    In the past two years, two separate facility-specific life cycle assessments (LCAs) have been performed as summer student projects. The first project focused on 13 facilities managed by NASA s Aeronautics Test Program (ATP), an organization responsible for large, high-energy ground test facilities that accomplish the nation s most advanced aerospace research. A facility inventory was created for each facility, and the operational-phase carbon footprint and environmental impact were calculated. The largest impacts stemmed from electricity and natural gas used directly at the facility and to generate support processes such as compressed air and steam. However, in specialized facilities that use unique inputs like R-134a, R-14, jet fuels, or nitrogen gas, these sometimes had a considerable effect on the facility s overall environmental impact. The second LCA project was conducted on the NASA Ames Arc Jet Complex and also involved creating a facility inventory and calculating the carbon footprint and environmental impact. In addition, operational alternatives were analyzed for their effectiveness at reducing impact. Overall, the Arc Jet Complex impact is dominated by the natural-gas fired boiler producing steam on-site, but alternatives were provided that could reduce the impact of the boiler operation, some of which are already being implemented. The data and results provided by these LCA projects are beneficial to both the individual facilities and NASA as a whole; the results have already been used in a proposal to reduce carbon footprint at Ames Research Center. To help future life cycle projects, several lessons learned have been recommended as simple and effective infrastructure improvements to NASA, including better utility metering and data recording and standardization of modeling choices and methods. These studies also increased sensitivity to and appreciation for quantifying the impact of NASA s activities.

  4. The Effect of Performance-Based Financial Incentives on Improving Health Care Provision in Burundi: A Controlled Cohort Study

    PubMed Central

    Rudasingwa, Martin; Soeters, Robert; Bossuyt, Michel

    2015-01-01

    To strengthen the health care delivery, the Burundian Government in collaboration with international NGOs piloted performance-based financing (PBF) in 2006. The health facilities were assigned - by using a simple matching method - to begin PBF scheme or to continue with the traditional input-based funding. Our objective was to analyse the effect of that PBF scheme on the quality of health services between 2006 and 2008. We conducted the analysis in 16 health facilities with PBF scheme and 13 health facilities without PBF scheme. We analysed the PBF effect by using 58 composite quality indicators of eight health services: Care management, outpatient care, maternity care, prenatal care, family planning, laboratory services, medicines management and materials management. The differences in quality improvement in the two groups of health facilities were performed applying descriptive statistics, a paired non-parametric Wilcoxon Signed Ranks test and a simple difference-in-difference approach at a significance level of 5%. We found an improvement of the quality of care in the PBF group and a significant deterioration in the non-PBF group in the same four health services: care management, outpatient care, maternity care, and prenatal care. The findings suggest a PBF effect of between 38 and 66 percentage points (p<0.001) in the quality scores of care management, outpatient care, prenatal care, and maternal care. We found no PBF effect on clinical support services: laboratory services, medicines management, and material management. The PBF scheme in Burundi contributed to the improvement of the health services that were strongly under the control of medical personnel (physicians and nurses) in a short time of two years. The clinical support services that did not significantly improved were strongly under the control of laboratory technicians, pharmacists and non-medical personnel. PMID:25948432

  5. 15 CFR 923.13 - Energy facility planning process.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Energy facility planning process. 923... RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Uses Subject to Management § 923.13 Energy facility planning process. The management program must contain a planning process for energy facilities...

  6. 15 CFR 923.13 - Energy facility planning process.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 15 Commerce and Foreign Trade 3 2012-01-01 2012-01-01 false Energy facility planning process. 923... RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Uses Subject to Management § 923.13 Energy facility planning process. The management program must contain a planning process for energy facilities...

  7. 15 CFR 923.13 - Energy facility planning process.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 15 Commerce and Foreign Trade 3 2013-01-01 2013-01-01 false Energy facility planning process. 923... RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Uses Subject to Management § 923.13 Energy facility planning process. The management program must contain a planning process for energy facilities...

  8. 15 CFR 923.13 - Energy facility planning process.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 15 Commerce and Foreign Trade 3 2011-01-01 2011-01-01 false Energy facility planning process. 923... RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Uses Subject to Management § 923.13 Energy facility planning process. The management program must contain a planning process for energy facilities...

  9. 15 CFR 923.13 - Energy facility planning process.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 15 Commerce and Foreign Trade 3 2014-01-01 2014-01-01 false Energy facility planning process. 923... RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Uses Subject to Management § 923.13 Energy facility planning process. The management program must contain a planning process for energy facilities...

  10. HEMISPHERIC CENTER FOR ENVIRONMENTAL TECHNOLOGY

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    M.A. Ebadian

    1999-07-31

    FIU-HCET personnel visited the Special Technologies Laboratory (STL) for discussions with the Principal Investigator (PI) of Laser Induced Fluorescence Imaging (LIFI) and for training in LIFI. Mr. Peter Gibbons, Tanks Retrieval Technology Integration Manager, visited FIU-HCET on July 20, 1999. Mr. Gibbons inspected the pipeline unplugging experimental facility at the HCET testing field. The detailed test bed construction, testing plan, and plugging material specifications were discussed.

  11. NASA X-Ray Observatory Completes Tests Under Harsh Simulated Space Conditions

    NASA Astrophysics Data System (ADS)

    1998-07-01

    NASA's most powerful X-ray observatory has successfully completed a month-long series of tests in the extreme heat, cold, and airless conditions it will encounter in space during its five-year mission to shed new light on some of the darkest mysteries of the universe. The Advanced X-ray Astrophysics Facility was put through the rigorous testing as it was alternately heated and cooled in a special vacuum chamber at TRW Space and Electronics Group in Redondo Beach, Calif., NASA's prime contractor for the observatory. "Successful completion of thermal vacuum testing marks a significant step in readying the observatory for launch aboard the Space Shuttle in January," said Fred Wojtalik, manager of the Observatory Projects Office at NASA's Marshall Space Flight Center in Huntsville, Ala. "The observatory is a complex, highly sophisticated, precision instrument," explained Wojtalik. "We are pleased with the outcome of the testing, and are very proud of the tremendous team of NASA and contractor technicians, engineers and scientists that came together and worked hard to meet this challenging task." Testing began in May after the observatory was raised into the 60-foot thermal vacuum chamber at TRW. Testing was completed on June 20. During the tests the Advanced X-ray Astrophysics Facility was exposed to 232 degree heat and 195 degree below zero Fahrenheit cold. During four temperature cycles, all elements of the observatory - the spacecraft, telescope, and science instruments - were checked out. Computer commands directing the observatory to perform certain functions were sent from test consoles at TRW to all Advanced X-ray Astrophysics Facility components. A team of contractor and NASA engineers and scientists monitored and evaluated the results. Commands were also sent from, and test data monitored at, the Advanced X-ray Astrophysics Facility Operations Control Center in Cambridge, Mass., as part of the test series. The observatory will be managed and controlled from the Operations Control Center after launch. "As is usually the case, we identified a few issues to be resolved before launch," said Wojtalik. "Overall, however, the observatory performed exceptionally well." The observatory test team discovered a mechanical problem with one of the primary science instruments, the Imaging Spectrometer. A door protecting the instrument did not function when commanded by test controllers. "We do these tests to check and double check every aspect of satellite operation that could affect the ultimate success of the science mission," said Craig Staresinich, TRW Advanced X-ray Astrophysics Facility program manager. "Discovering a problem now is a success. Discovering a problem later, after launch, would be a failure." A team of NASA and contractor engineers are studying the mechanical problem and developing a plan to correct it. The instrument will be sent back to its builder, Lockheed-Martin Astronautics in Denver, Colo., where it will be repaired while the rest of the observatory continues other testing. This should still allow an on-time delivery of the observatory to NASA's Kennedy Space Center, Fla., in August, where it will be readied for launch in January. With a resolving power 10 times greater than previous X-ray telescopes, the new X-ray observatory will provide scientists with views of previously invisible X-ray sources, including black holes, exploding stars and interstellar gasses. The third of NASA's Great Observatories, it will join the Compton Gamma Ray Observatory and the Hubble Space Telescope in orbit. The Advanced X-ray Astrophysics Facility program is managed by the Marshall Center for the Office of Space Science, NASA Headquarters, Washington, D.C. TRW Space & Electronics Group is assembling the observatory and doing verification testing. The Advanced X-ray Astrophysics Facility Operations Control Center is operated by the Smithsonian Astrophysical Observatory. Using glass purchased from Schott Glaswerke, Mainz, Germany, the telescope's mirrors were built by Raytheon Optical Systems Inc., Danbury, Conn. The mirrors were coated by Optical Coating Laboratory, Inc., Santa Rosa, Calif., and assembled by EastmanKodak Co., Rochester, N.Y. The Advanced X-ray Astrophysics Facility Charge-Coupled Device Imaging Spectrometer was developed by Pennsylvania State University, University Park, Pa., and the Massachusetts Institute of Technology (MIT), Cambridge. One diffraction grating was developed by MIT, the other by the Space Research Organization Netherlands, Utrecht, Netherlands, in collaboration with the Max Planck Institute, Garching, Germany. The High Resolution Camera was built by the Smithsonian Astrophysical Observatory. Ball Aerospace & Technologies Corporation of Boulder, Colo., developed the aspect camera and the Science Instrument Module. Note to editors: Digital images to accompany this release are available via the World Wide Web at the following URL: http://chandra.harvard.edu/press/images.html

  12. Test results management and distributed cognition in electronic health record-enabled primary care.

    PubMed

    Smith, Michael W; Hughes, Ashley M; Brown, Charnetta; Russo And, Elise; Giardina, Traber D; Mehta, Praveen; Singh, Hardeep

    2018-06-01

    Managing abnormal test results in primary care involves coordination across various settings. This study identifies how primary care teams manage test results in a large, computerized healthcare system in order to inform health information technology requirements for test results management and other distributed healthcare services. At five US Veterans Health Administration facilities, we interviewed 37 primary care team members, including 16 primary care providers, 12 registered nurses, and 9 licensed practical nurses. We performed content analysis using a distributed cognition approach, identifying patterns of information transmission across people and artifacts (e.g. electronic health records). Results illustrate challenges (e.g. information overload) as well as strategies used to overcome challenges. Various communication paths were used. Some team members served as intermediaries, processing information before relaying it. Artifacts were used as memory aids. Health information technology should address the risks of distributed work by supporting awareness of team and task status for reliable management of results.

  13. Prototyping Control and Data Acquisition for the ITER Neutral Beam Test Facility

    NASA Astrophysics Data System (ADS)

    Luchetta, Adriano; Manduchi, Gabriele; Taliercio, Cesare; Soppelsa, Anton; Paolucci, Francesco; Sartori, Filippo; Barbato, Paolo; Breda, Mauro; Capobianco, Roberto; Molon, Federico; Moressa, Modesto; Polato, Sandro; Simionato, Paola; Zampiva, Enrico

    2013-10-01

    The ITER Neutral Beam Test Facility will be the project's R&D facility for heating neutral beam injectors (HNB) for fusion research operating with H/D negative ions. Its mission is to develop technology to build the HNB prototype injector meeting the stringent HNB requirements (16.5 MW injection power, -1 MeV acceleration energy, 40 A ion current and one hour continuous operation). Two test-beds will be built in sequence in the facility: first SPIDER, the ion source test-bed, to optimize the negative ion source performance, second MITICA, the actual prototype injector, to optimize ion beam acceleration and neutralization. The SPIDER control and data acquisition system is under design. To validate the main architectural choices, a system prototype has been assembled and performance tests have been executed to assess the prototype's capability to meet the control and data acquisition system requirements. The prototype is based on open-source software frameworks running under Linux. EPICS is the slow control engine, MDSplus is the data handler and MARTe is the fast control manager. The prototype addresses low and high-frequency data acquisition, 10 kS/s and 10 MS/s respectively, camera image acquisition, data archiving, data streaming, data retrieval and visualization, real time fast control with 100 μs control cycle and supervisory control.

  14. Managing NIF safety equipment in a high neutron and gamma radiation environment.

    PubMed

    Datte, Philip; Eckart, Mark; Jackson, Mark; Khater, Hesham; Manuel, Stacie; Newton, Mark

    2013-06-01

    The National Ignition Facility (NIF) is a 192 laser beam facility that supports the Inertial Confinement Fusion program. During the ignition experimental campaign, the NIF is expected to perform shots with varying fusion yield producing 14 MeV neutrons up to 20 MJ or 7.1 × 10(18) neutrons per shot and a maximum annual yield of 1,200 MJ. Several infrastructure support systems will be exposed to varying high yield shots over the facility's 30-y life span. In response to this potential exposure, analysis and testing of several facility safety systems have been conducted. A detailed MCNP (Monte Carlo N-Particle Transport Code) model has been developed for the NIF facility, and it includes most of the major structures inside the Target Bay. The model has been used in the simulation of expected neutron and gamma fluences throughout the Target Bay. Radiation susceptible components were identified and tested to fluences greater than 10(13) (n cm(-2)) for 14 MeV neutrons and γ-ray equivalent. The testing includes component irradiation using a 60Co gamma source and accelerator-based irradiation using 4- and 14- MeV neutron sources. The subsystem implementation in the facility is based on the fluence estimates after shielding and survivability guidelines derived from the dose maps and component tests results. This paper reports on the evaluation and implementation of mitigations for several infrastructure safety support systems, including video, oxygen monitoring, pressure monitors, water sensing systems, and access control interfaces found at the NIF.

  15. KSC-2012-6405

    NASA Image and Video Library

    2012-09-20

    CAPE CANAVERAL, Fla. -- At NASA’s Kennedy Space Center in Florida, a groundbreaking was held to mark the start of construction on the Antenna Test Bed Array for the Ka-Band Objects Observation and Monitoring, or Ka-BOOM system. Using ceremonial shovels to mark the site, from left are Michael Le, lead design engineer and construction manager Sue Vingris, Cape Design Engineer Co. project manager Kannan Rengarajan, chief executive officer of Cape Design Engineer Co. Lutfi Mized, president of Cape Design Engineer Co. David Roelandt, construction site superintendent with Cape Design Engineer Co. Marc Seibert, NASA project manager Michael Miller, NASA project manager Peter Aragona, KSC’s Electromagnetic Lab manager Stacy Hopper, KSCs master planning supervisor Dr. Bary Geldzabler, NASA chief scientist and KSC’s Chief Technologist Karen Thompson. The construction site is near the former Vertical Processing Facility, which has been demolished. Workers will begin construction on the pile foundations for the 40-foot-diameter dish antenna arrays and their associated utilities, and prepare the site for the operations command center facility. Photo credit: NASA/Charisse Nahser

  16. KSC-2012-6404

    NASA Image and Video Library

    2012-09-20

    CAPE CANAVERAL, Fla. -- At NASA’s Kennedy Space Center in Florida, a groundbreaking was held to mark the start of construction on the Antenna Test Bed Array for the Ka-Band Objects Observation and Monitoring, or Ka-BOOM system. Holding ceremonial shovels, from left are Michael Le, lead design engineer and construction manager Sue Vingris, Cape Design Engineer Co. project manager Kannan Rengarajan, chief executive officer of Cape Design Engineer Co. Lutfi Mized, president of Cape Design Engineer Co. David Roelandt, construction site superintendent with Cape Design Engineer Co. Marc Seibert, NASA project manager Michael Miller, NASA project manager Peter Aragona, KSC’s Electromagnetic Lab manager Stacy Hopper, KSCs master planning supervisor Dr. Bary Geldzabler, NASA chief scientist and KSC’s Chief Technologist Karen Thompson. The construction site is near the former Vertical Processing Facility, which has been demolished. Workers will begin construction on the pile foundations for the 40-foot-diameter dish antenna arrays and their associated utilities, and prepare the site for the operations command center facility. Photo credit: NASA/Charisse Nahser

  17. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Montoya, Amber L.; Wagner, Katrina; Goering, Teresa Lynn

    Tonopah Test Range (TTR) in Nevada and Kauai Test Facility (KTF) in Hawaii are government-owned, contractor-operated facilities operated by Sandia Corporation, a subsidiary of Lockheed Martin Corporation. The U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA), through the Sandia Site Office (SSO), in Albuquerque, NM, manages TTR and KTF's operations. Sandia Corporation conducts operations at TTR in support of DOE/NNSA's Weapons Ordnance Program and has operated the site since 1957. Westinghouse Government Services subcontracts to Sandia Corporation in administering most of the environmental programs at TTR. Sandia Corporation operates KTF as a rocket preparation launching and tracking facility.more » This Annual Site Environmental Report (ASER) summarizes data and the compliance status of the environmental protection and monitoring program at TTR and KTF through Calendar Year (CY) 2004. The compliance status of environmental regulations applicable at these sites include state and federal regulations governing air emissions, wastewater effluent, waste management, terrestrial surveillance, and Environmental Restoration (ER) cleanup activities. Sandia Corporation is responsible only for those environmental program activities related to its operations. The DOE/NNSA, Nevada Site Office (NSO) retains responsibility for the cleanup and management of ER TTR sites. Currently, there are no ER Sites at KTF. Environmental monitoring and surveillance programs are required by DOE Order 450.1, Environmental Protection Program (DOE 2005) and DOE Order 231.1A, Environment, Safety, and Health Reporting (DOE 2004b).« less

  18. ARES I-X Launch

    NASA Image and Video Library

    2009-10-27

    NASA Ares I-X mission managers watch as NASA's Ares I-X rocket launches from pad 39b at the Kennedy Space Center in Cape Canaveral, Fla., Wednesday, Oct. 28, 2009. The flight test will provide NASA with an early opportunity to test and prove flight characteristics, hardware, facilities and ground operations associated with the Ares I. Photo Credit: (NASA/Bill Ingalls)

  19. When a disaster strikes without warning: how effective is your response plan?

    PubMed

    Steiner, P J

    2001-01-01

    When an outside high-pressure natural gas line was cut near the intakes to a hospital's ventilation system, gas was quickly dispersed throughout the building. The facility's disaster management plan faced a real-life test.

  20. 29 CFR 1960.7 - Financial management.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... levels, including necessary administrative costs such as training, travel, and personal protective equipment; (2) Abatement of unsafe or unhealthful working conditions related to agency operations or facilities; (3) Safety and health sampling, testing, and diagnostic and analytical tools and equipment...

  1. Modeling, simulation and control for a cryogenic fluid management facility, preliminary report

    NASA Technical Reports Server (NTRS)

    Turner, Max A.; Vanbuskirk, P. D.

    1986-01-01

    The synthesis of a control system for a cryogenic fluid management facility was studied. The severe demand for reliability as well as instrumentation and control unique to the Space Station environment are prime considerations. Realizing that the effective control system depends heavily on quantitative description of the facility dynamics, a methodology for process identification and parameter estimation is postulated. A block diagram of the associated control system is also produced. Finally, an on-line adaptive control strategy is developed utilizing optimization of the velocity form control parameters (proportional gains, integration and derivative time constants) in appropriate difference equations for direct digital control. Of special concern are the communications, software and hardware supporting interaction between the ground and orbital systems. It is visualized that specialist in the OSI/ISO utilizing the Ada programming language will influence further development, testing and validation of the simplistic models presented here for adaptation to the actual flight environment.

  2. Energy intensity modeling for wastewater treatment technologies.

    PubMed

    Molinos-Senante, María; Sala-Garrido, Ramón; Iftimi, Adina

    2018-07-15

    Wastewater treatment plants (WWTPs) are energy intensive facilities; therefore increased pressure has been placed on managers and policy makers to reduce the facilities' energy use. Several studies were conducted to compare the energy intensity (EI) of WWTPs, which showed large dispersion in EI among the facilities. In the present study, the degree EI influenced WWTPs was tested using a set of technical variables by modeling the EI of a 305 WWTP sample grouped into five secondary treatment technologies. Results indicated the following two major findings: i) WWTPs using conventional activated sludge, extended aeration, trickling biofilters, and biodisks exhibited significant economies of scale in energy use; and ii) pollutant removal efficiency demonstrated low impacts on WWTP EI. The methodology and results of this study are of value to policy makers in planning new WWTPs and developing management plans to improve energy efficiency of wastewater treatment. Copyright © 2018. Published by Elsevier B.V.

  3. 48 CFR 801.602-80 - Legal and technical review-Office of Construction and Facilities Management and National Cemetery...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...-Office of Construction and Facilities Management and National Cemetery Administration. 801.602-80 Section... Responsibilities 801.602-80 Legal and technical review-Office of Construction and Facilities Management and National Cemetery Administration. An Office of Construction and Facilities Management or National Cemetery...

  4. 48 CFR 801.602-80 - Legal and technical review-Office of Construction and Facilities Management and National Cemetery...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...-Office of Construction and Facilities Management and National Cemetery Administration. 801.602-80 Section... Responsibilities 801.602-80 Legal and technical review-Office of Construction and Facilities Management and National Cemetery Administration. An Office of Construction and Facilities Management or National Cemetery...

  5. 48 CFR 801.602-80 - Legal and technical review-Office of Construction and Facilities Management and National Cemetery...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...-Office of Construction and Facilities Management and National Cemetery Administration. 801.602-80 Section... Responsibilities 801.602-80 Legal and technical review-Office of Construction and Facilities Management and National Cemetery Administration. An Office of Construction and Facilities Management or National Cemetery...

  6. 48 CFR 801.602-80 - Legal and technical review-Office of Construction and Facilities Management and National Cemetery...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...-Office of Construction and Facilities Management and National Cemetery Administration. 801.602-80 Section... Responsibilities 801.602-80 Legal and technical review-Office of Construction and Facilities Management and National Cemetery Administration. An Office of Construction and Facilities Management or National Cemetery...

  7. 41 CFR 102-74.355 - With what accident and fire prevention standards must Federal facilities comply?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Accident and Fire Prevention... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false With what accident and fire prevention standards must Federal facilities comply? 102-74.355 Section 102-74.355 Public...

  8. 7 CFR 210.13 - Facilities management.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Facilities management. 210.13 Section 210.13... Participation § 210.13 Facilities management. Link to an amendment published at 74 FR 66216, Dec. 15, 2009. (a..., the added text is set forth as follows: § 210.13 Facilities management. (c) Food safety program. The...

  9. Reducing Stock-Outs of Life Saving Malaria Commodities Using Mobile Phone Text-Messaging: SMS for Life Study in Kenya

    PubMed Central

    Githinji, Sophie; Kigen, Samwel; Memusi, Dorothy; Nyandigisi, Andrew; Mbithi, Agneta M.; Wamari, Andrew; Muturi, Alex N.; Jagoe, George; Barrington, Jim; Snow, Robert W.; Zurovac, Dejan

    2013-01-01

    Background Health facility stock-outs of life saving malaria medicines are common across Africa. Innovative ways of addressing this problem are urgently required. We evaluated whether SMS based reporting of stocks of artemether-lumefantrine (AL) and rapid diagnostic tests (RDT) can result in reduction of stock-outs at peripheral facilities in Kenya. Methods/Findings All 87 public health facilities in five Kenyan districts were included in a 26 week project. Weekly facility stock counts of four AL packs and RDTs were sent via structured incentivized SMS communication process from health workers’ personal mobile phones to a web-based system accessed by district managers. The mean health facility response rate was 97% with a mean formatting error rate of 3%. Accuracy of stock count reports was 79% while accuracy of stock-out reports was 93%. District managers accessed the system 1,037 times at an average of eight times per week. The system was accessed in 82% of the study weeks. Comparing weeks 1 and 26, stock-out of one or more AL packs declined by 38 percentage-points. Total AL stock-out declined by 5 percentage-points and was eliminated by the end of the project. Stock-out declines of individual AL packs ranged from 14 to 32 percentage-points while decline in RDT stock-outs was 24 percentage-points. District managers responded to 44% of AL and 73% of RDT stock-out signals by redistributing commodities between facilities. In comparison with national trends, stock-out declines in study areas were greater, sharper and more sustained. Conclusions Use of simple SMS technology ensured high reporting rates of reasonably accurate, real-time facility stock data that were used by district managers to undertake corrective actions to reduce stock-outs. Future work on stock monitoring via SMS should focus on assessing response rates without use of incentives and demonstrating effectiveness of such interventions on a larger scale. PMID:23349786

  10. 41 CFR 102-74.290 - May Federal agencies allow employees to use parking spaces not required for official needs?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Parking Facilities... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false May Federal agencies...

  11. 41 CFR 102-74.285 - How must Federal agencies assign priority to parking spaces in controlled areas?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false How must Federal... Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Parking Facilities § 102-74...

  12. 41 CFR 102-74.10 - What is the basic facility management policy?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What is the basic facility management policy? 102-74.10 Section 102-74.10 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY...

  13. Effect of integrated capacity-building interventions on malaria case management by health professionals in Uganda: a mixed design study with pre/post and cluster randomized trial components.

    PubMed

    Mbonye, Martin Kayitale; Burnett, Sarah M; Burua, Aldomoro; Colebunders, Robert; Crozier, Ian; Kinoti, Stephen N; Ronald, Allan; Naikoba, Sarah; Rubashembusya, Timothy; Van Geertruyden, Jean-Pierre; Willis, Kelly S; Weaver, Marcia R

    2014-01-01

    The Integrated Infectious Diseases Capacity Building Evaluation (IDCAP) designed two interventions: Integrated Management of Infectious Disease (IMID) training program and On-Site Support (OSS). We evaluated their effects on 23 facility performance indicators, including malaria case management. IMID, a three-week training with two follow-up booster courses, was for two mid- level practitioners, primarily clinical officers and registered nurses, from 36 primary care facilities. OSS was two days of training and continuous quality improvement activities for nine months at 18 facilities, to which all health workers were invited to participate. Facilities were randomized as clusters 1∶1 to parallel OSS "arm A" or control "arm B". Outpatient data on four malaria case management indicators were collected for 14 months. Analysis compared changes before and during the interventions within arms (relative risk = RR). The effect of OSS was measured with the difference in changes across arms (ratio of RR = RRR). The proportion of patients with suspected malaria for whom a diagnostic test result for malaria was recorded decreased in arm B (adjusted RR (aRR) = 0.97; 99%CI: 0.82,1.14) during IMID, but increased 25% in arm A (aRR = 1.25; 99%CI:0.94, 1.65) during IMID and OSS relative to baseline; (aRRR = 1.28; 99%CI:0.93, 1.78). The estimated proportion of patients that received an appropriate antimalarial among those prescribed any antimalarial increased in arm B (aRR = 1.09; 99%CI: 0.87, 1.36) and arm A (aRR = 1.50; 99%CI: 1.04, 2.17); (aRRR = 1.38; 99%CI: 0.89, 2.13). The proportion of patients with a negative diagnostic test result for malaria prescribed an antimalarial decreased in arm B (aRR = 0.96; 99%CI: 0.84, 1.10) and arm A (aRR = 0.67; 99%CI: 0.46, 0.97); (aRRR = 0.70; 99%CI: 0.48, 1.00). The proportion of patients with a positive diagnostic test result for malaria prescribed an antibiotic did not change significantly in either arm. The combination of IMID and OSS was associated with statistically significant improvements in malaria case management.

  14. Testing activities at the National Battery Test Laboratory

    NASA Astrophysics Data System (ADS)

    Hornstra, F.; Deluca, W. H.; Mulcahey, T. P.

    The National Battery Test Laboratory (NBTL) is an Argonne National Laboratory facility for testing, evaluating, and studying advanced electric storage batteries. The facility tests batteries developed under Department of Energy programs and from private industry. These include batteries intended for future electric vehicle (EV) propulsion, electric utility load leveling (LL), and solar energy storage. Since becoming operational, the NBTL has evaluated well over 1400 cells (generally in the form of three- to six-cell modules, but up to 140-cell batteries) of various technologies. Performance characterization assessments are conducted under a series of charge/discharge cycles with constant current, constant power, peak power, and computer simulated dynamic load profile conditions. Flexible charging algorithms are provided to accommodate the specific needs of each battery under test. Special studies are conducted to explore and optimize charge procedures, to investigate the impact of unique load demands on battery performance, and to analyze the thermal management requirements of battery systems.

  15. Trends in Facility Management Technology: The Emergence of the Internet, GIS, and Facility Assessment Decision Support.

    ERIC Educational Resources Information Center

    Teicholz, Eric

    1997-01-01

    Reports research on trends in computer-aided facilities management using the Internet and geographic information system (GIS) technology for space utilization research. Proposes that facility assessment software holds promise for supporting facility management decision making, and outlines four areas for its use: inventory; evaluation; reporting;…

  16. An automated calibration laboratory - Requirements and design approach

    NASA Technical Reports Server (NTRS)

    O'Neil-Rood, Nora; Glover, Richard D.

    1990-01-01

    NASA's Dryden Flight Research Facility (Ames-Dryden), operates a diverse fleet of research aircraft which are heavily instrumented to provide both real time data for in-flight monitoring and recorded data for postflight analysis. Ames-Dryden's existing automated calibration (AUTOCAL) laboratory is a computerized facility which tests aircraft sensors to certify accuracy for anticipated harsh flight environments. Recently, a major AUTOCAL lab upgrade was initiated; the goal of this modernization is to enhance productivity and improve configuration management for both software and test data. The new system will have multiple testing stations employing distributed processing linked by a local area network to a centralized database. The baseline requirements for the new AUTOCAL lab and the design approach being taken for its mechanization are described.

  17. Test Area C-74 Complex Final Range Environmental Assessment at Eglin Air Force Base, Florida

    DTIC Science & Technology

    2015-08-21

    LAWS, REGULATIONS, AND POLICIES ACRONYMS AND ABBREVIATIONS ACHP Advisory Council on Historic Preservation ACM asbestos -containing materials...agencies must comply. Air Armament Center Plan 32-3; January 2004; Asbestos Management Plan; This plan establishes procedures for the Eglin AFB...facility asbestos management program. It contains the policies and procedures used in controlling the health hazards created by asbestos containing

  18. Assessing infection control practices to protect health care workers and patients in Malawi from nosocomial transmission of Mycobacterium tuberculosis.

    PubMed

    Flick, Robert J; Munthali, Adamson; Simon, Katherine; Hosseinipour, Mina; Kim, Maria H; Mlauzi, Lameck; Kazembe, Peter N; Ahmed, Saeed

    2017-01-01

    Transmission of Mycobacterium tuberculosis (TB) in health settings threatens health care workers and people living with HIV in sub-Saharan Africa. Nosocomial transmission is reduced with implementation of infection control (IC) guidelines. The objective of this study is to describe implementation of TB IC measures in Malawi. We conducted a cross-sectional study utilizing anonymous health worker questionnaires, semi-structured interviews with facility managers, and direct observations at 17 facilities in central Malawi. Of 592 health care workers surveyed, 34% reported that all patients entering the facility were screened for cough and only 8% correctly named the four most common signs and symptoms of TB in adults. Of 33 managers interviewed, 7 (21%) and 1 (3%) provided the correct TB screening questions for use in adults and children, respectively. Of 592 health workers, only 2.4% had been screened for TB in the previous year. Most (90%) reported knowing their HIV status, 53% were tested at their facility of employment, and half reported they would feel comfortable receiving ART or TB treatment at their facility of employment. We conclude that screening is infrequently conducted and knowledge gaps may undercut its effectiveness. Further, health care workers do not routinely access TB and HIV diagnostic and treatment services at their facility of employment.

  19. Inter-facility transfer of surgical emergencies in a developing country: effects on management and surgical outcomes.

    PubMed

    Khan, Salma; Zafar, Hasnain; Zafar, Syed Nabeel; Haroon, Naveed

    2014-02-01

    Outcomes of surgical emergencies are associated with promptness of the appropriate surgical intervention. However, delayed presentation of surgical patients is common in most developing countries. Delays commonly occur due to transfer of patients between facilities. The aim of the present study was to assess the effect of delays in treatment caused by inter-facility transfers of patients presenting with surgical emergencies as measured by objective and subjective parameters. We prospectively collected data on all patients presenting with an acute surgical emergency at Aga Khan University Hospital (AKUH). Information regarding demographics, social class, reason and number of transfers, and distance traveled were collected. Patients were categorized into two groups, those transferred to AKUH from another facility (transferred) and direct arrivals (non-transfers). Differences between presenting physiological parameters, vital statistics, and management were tested between the two groups by the chi square and t tests. Ninety-nine patients were included, 49 (49.5 %) patients having been transferred from another facility. The most common reason for transfer was "lack of satisfactory surgical care." There were significant differences in presenting pulse, oxygen saturation, respiratory rate, fluid for resuscitation, glasgow coma scale, and revised trauma score (all p values <0.001) between transferred and non-transferred patients. In 56 patients there was a further delay in admission, and the most common reason was bed availability, followed by financial constraints. Three patients were shifted out of the hospital due to lack of ventilator, and 14 patients left against medical advice due to financial limitations. One patient died. Inter-facility transfer of patients with surgical emergencies is common. These patients arrive with deranged physiology which requires complex and prolonged hospital care. Patients who cannot afford treatment are most vulnerable to transfers and delays.

  20. 41 CFR 102-74.210 - What steps must Executive agencies take to promote ridesharing at Federal facilities?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Ridesharing § 102-74.210 What... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What steps must Executive agencies take to promote ridesharing at Federal facilities? 102-74.210 Section 102-74.210 Public...

  1. The reality of task shifting in medicines management- a case study from Tanzania.

    PubMed

    Wiedenmayer, Karin A; Kapologwe, Ntuli; Charles, James; Chilunda, Fiona; Mapunjo, Siana

    2015-01-01

    Tanzania suffers a severe shortage of pharmaceutical staff. This negatively affects the provision of pharmaceutical services and access to medicines, particularly in rural areas. Task shifting has been proposed as a way to mitigate the impact of health worker shortfalls.The aim of this study was to understand the context and extent of task shifting in pharmaceutical management in Dodoma Region, Tanzania. We explored 1) the number of trained pharmaceutical staff as compared to clinical cadres managing medicines, 2) the national establishment for staffing levels, 3) job descriptions, 4) supply management training conducted and 5) availability of medicines and adherence to Good Storage Practice. A cross-sectional study was conducted in 270 public health facilities in 2011. A pre-tested questionnaire was administered to the person in charge of the facility to collect data on staff employed and their respective pharmaceutical tasks. Availability of 26 tracer medicines and adherence to Good Storage Practice guidelines was surveyed by direct observation. The national establishments for pharmaceutical staffing levels and job descriptions of facility cadres were analysed. While required staffing levels in 1999 were 50, the region employed a total of only 14 pharmaceutical staff in 2011. Job descriptions revealed that, next to pharmaceutical staff, only nurses were required to provide dispensing services and adherence counselling. In 95.5% of studied health facilities medicines management was done by non-pharmaceutically trained cadres, predominantly medical attendants. The first training on supply management was provided in 2005 with no refresher training thereafter. Mean availability of tracer medicines was 53%, while 56% of health facilities fully met criteria of Good Storage Practice. Task shifting is a reality in the pharmaceutical sector in Tanzania and it occurs mainly as a coping mechanism rather than a formal response to the workforce crisis. In Dodoma Region, pharmacy-related tasks and supply management have informally been shifted to clinical staff without policy guidance, explicit job descriptions, and without the necessary support through training. Implicit task shifting should be recognized and formalized. Job orientation, training and operational procedures may be useful to support non-pharmaceutical health workers to effectively manage medicine supply.

  2. Effluent Management Facility Evaporator Bottom-Waste Streams Formulation and Waste Form Qualification Testing

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Saslow, Sarah A.; Um, Wooyong; Russell, Renee L.

    This report describes the results from grout formulation and cementitious waste form qualification testing performed by Pacific Northwest National Laboratory (PNNL) for Washington River Protection Solutions, LLC (WRPS). These results are part of a screening test that investigates three grout formulations proposed for wide-range treatment of different waste stream compositions expected for the Hanford Effluent Management Facility (EMF) evaporator bottom waste. This work supports the technical development need for alternative disposition paths for the EMF evaporator bottom wastes and future direct feed low-activity waste (DFLAW) operations at the Hanford Site. High-priority activities included simulant production, grout formulation, and cementitious wastemore » form qualification testing. The work contained within this report relates to waste form development and testing, and does not directly support the 2017 Integrated Disposal Facility (IDF) performance assessment (PA). However, this work contains valuable information for use in PA maintenance past FY 2017 and future waste form development efforts. The provided results and data should be used by (1) cementitious waste form scientists to further the understanding of cementitious leach behavior of contaminants of concern (COCs), (2) decision makers interested in off-site waste form disposal, and (3) the U.S. Department of Energy, their Hanford Site contractors and stakeholders as they assess the IDF PA program at the Hanford Site. The results reported help fill existing data gaps, support final selection of a cementitious waste form for the EMF evaporator bottom waste, and improve the technical defensibility of long-term waste form risk estimates.« less

  3. [EVALUATION OF THE EFFECTIVENESS OF ADDITIONAL PROFESSIONAL EDUCATION ON THE BASIS OF HEALTH CARE FACILITY].

    PubMed

    Bohomaz, V M; Rymarenko, P V

    2014-01-01

    In this study we tested methods of facility learning of health care workers as part of a modern model of quality management of medical services. The statistical and qualitative analysis of the effectiveness of additional training in emergency medical care at the health facility using an adapted curriculum and special mannequins. Under the guidance of a certified instructor focus group of 53 doctors and junior medical specialists studied 22 hours. According to a survey of employees trained their level of selfassessment of knowledge and skills sigificantly increased. Also significantly increased the proportion of correct answers in a formalized testing both categories of workers. Using androgological learning model, mannequins simulators and training in small groups at work create the most favorable conditions for effective individual and group practical skills of emergency medicine.

  4. A standards-based approach to quality improvement for HIV services at Zambia Defence Force facilities: results and lessons learned.

    PubMed

    Kols, Adrienne; Kim, Young-Mi; Bazant, Eva; Necochea, Edgar; Banda, Joseph; Stender, Stacie

    2015-07-01

    The Zambia Defence Force adopted the Standards-Based Management and Recognition approach to improve the quality of the HIV-related services at its health facilities. This quality improvement intervention relies on comprehensive, detailed assessment tools to communicate and verify adherence to national standards of care, and to test and implement changes to improve performance. A quasi-experimental evaluation of the intervention was conducted at eight Zambia Defence Force primary health facilities (four facilities implemented the intervention and four did not). Data from three previous analyses are combined to assess the effect of Standards-Based Management and Recognition on three domains: facility readiness to provide services; observed provider performance during antiretroviral therapy (ART) and antenatal care consultations; and provider perceptions of the work environment. Facility readiness scores for ART improved on four of the eight standards at intervention sites, and one standard at comparison sites. Facility readiness scores for prevention of mother-to-child transmission (PMTCT) of HIV increased by 15 percentage points at intervention sites and 7 percentage points at comparison sites. Provider performance improved significantly at intervention sites for both ART services (from 58 to 84%; P < 0.01) and PMTCT services (from 58 to 73%; P = 0.003); there was no significant change at comparison sites. Providers' perceptions of the work environment generally improved at intervention sites and declined at comparison sites; differences in trends between study groups were significant for eight items. A standards-based approach to quality improvement proved effective in supporting healthcare managers and providers to deliver ART and PMTCT services in accordance with evidence-based standards in a health system suffering from staff shortages.

  5. Performance of freestanding inpatient rehabilitation hospitals before and after the rehabilitation prospective payment system.

    PubMed

    Thompson, Jon M; McCue, Michael J

    2010-01-01

    Inpatient rehabilitation hospitals provide important services to patients to restore physical and cognitive functioning. Historically, these hospitals have been reimbursed by Medicare under a cost-based system; but in 2002, Medicare implemented a rehabilitation prospective payment system (PPS). Despite the implementation of a PPS for rehabilitation, there is limited published research that addresses the operating and financial performance of these hospitals. We examined operating and financial performance in the pre- and post-PPS periods for for-profit and nonprofit freestanding inpatient rehabilitation hospitals to test for pre- and post-PPS differences within the ownership groups. We identified freestanding inpatient rehabilitation hospitals from the Centers for Medicare and Medicaid Services Health Care Cost Report Information System database for the first two fiscal years under PPS. We excluded facilities that had fiscal years less than 270 days, facilities with missing data, and government facilities. We computed average values for performance variables for the facilities in the two consecutive fiscal years post-PPS. For the pre-PPS period, we collected data on these same facilities and, once facilities with missing data and fiscal years less than 270 days were excluded, computed average values for the two consecutive fiscal years pre-PPS. Our final sample of 140 inpatient rehabilitation facilities was composed of 44 nonprofit hospitals and 96 for-profit hospitals both pre- and post-PPS. We utilized a pairwise comparison test (t-test comparison) to measure the significance of differences on each performance variable between pre- and post-PPS periods within each ownership group. Findings show that both nonprofit and for-profit freestanding inpatient rehabilitation hospitals reduced length of stay, increased discharges, and increased profitability. Within the for-profit ownership group, the percentage of Medicare discharges increased and operating expense per adjusted discharge decreased. Findings suggest that managers of these hospitals have adapted their administrative practices to conform with the financial incentives of the rehabilitation PPS. Managers must continue to control costs, increase discharges, and reduce length of stay to remain financially viable under the rehabilitation PPS.

  6. HIV/AIDS related commodities supply chain management in public health facilities of Addis Ababa, Ethiopia: a cross-sectional survey.

    PubMed

    Berhanemeskel, Eyerusalem; Beedemariam, Gebremedhin; Fenta, Teferi Gedif

    2016-01-01

    A wide range of pharmaceutical products are needed for diagnosis, treatment, and prevention of HIV/AIDS. However, interrupted supplies and stock-outs are the major challenges in the supply chain of ARV medicines and related commodities. The aim of this study was to assess the supply chain management of HIV/AIDS related commodities in public health facilities of Addis Ababa, Ethiopia. A descriptive cross-sectional survey complemented by qualitative method was conducted in 24 public health facilities (4 hospitals and 20 health centers). A semi-structured questionnaire and observation check list were used to collect data on HIV/AIDS related service, reporting and ordering; receiving, transportation and storage condition of ARV medicines and test kits; and supportive supervision and logistics management information system. In addition, in-depth interview with flexible probing techniques was used to complement the quantitative data with emphasis to the storage condition of ARV medicines and test kits. Quantitative data was analyzed using SPSS version-20. Analysis of qualitative data involved rigorous reading of transcripts in order to identify key themes and data was analyzed using thematic approach. The study revealed that 16 health centers and one hospital had recorded and reported patient medication record. Six months prior to the study, 14 health centers and 2 hospitals had stopped VCT services for one time or more. Three hospitals and 18 health centers claimed to have been able to submit the requisition and report concerning ARV medicines to Pharmaceutical Fund and Supply Agency according to the specific reporting period. More than three-fourth of the health centers had one or more emergency order of ARV medicines on the day of visit, while all of hospitals had emergency order more than 3 times within 6 months prior to the study. All of the hospitals and nearly half of the health centers had an emergency order of test kits more than 3 times in the past 6 months. Overall, nearly 3/4th of the health facilities faced stock-out of one or more ARV medicines and test kits on the day of visit. There was no adequate data on patient medication record and stock status of HIV/AIDS related commodities. Moreover there were frequent stock-outs of ARV medicines and HIV test kits, which was an indicator of the weak supply chain management. Hospitals and health centers, therefore, should devise a system to capture and make use of patient medication record and stock status information so as to ensure continuous supply of the commodities.

  7. Inside KSC! for May 5, 2017

    NASA Image and Video Library

    2017-05-04

    The Orion structural test article was packed inside NASA's Super Guppy aircraft at Kennedy for shipment to Lockheed Martin's Denver facility. Meanwhile, NASA’s Eighth Annual First Nations Launch Competition, managed for NASA by Kennedy's education team, was held in Kansasville, Wisconsin.

  8. 30 CFR 553.28 - What financial test procedures must I use to evaluate the amount of self-insurance allowed as...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 553.28 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL SPILL FINANCIAL RESPONSIBILITY FOR OFFSHORE FACILITIES Methods for Demonstrating OSFR § 553.28 What...

  9. 30 CFR 553.28 - What financial test procedures must I use to evaluate the amount of self-insurance allowed as...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 553.28 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL SPILL FINANCIAL RESPONSIBILITY FOR OFFSHORE FACILITIES Methods for Demonstrating OSFR § 553.28 What...

  10. 30 CFR 553.28 - What financial test procedures must I use to evaluate the amount of self-insurance allowed as...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 553.28 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL SPILL FINANCIAL RESPONSIBILITY FOR OFFSHORE FACILITIES Methods for Demonstrating OSFR § 553.28 What...

  11. 41 CFR 102-74.305 - How must Federal agencies assign available parking spaces to their employees?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Parking Facilities § 102-74.305 How must... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false How must Federal...

  12. 41 CFR 102-74.300 - How must space available for employee parking be allocated among occupant agencies?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Parking Facilities § 102-74... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false How must space available...

  13. Advancing Test Capabilities at NASA Wind Tunnels

    NASA Technical Reports Server (NTRS)

    Bell, James

    2015-01-01

    NASA maintains twelve major wind tunnels at three field centers capable of providing flows at 0.1 M 10 and unit Reynolds numbers up to 45106m. The maintenance and enhancement of these facilities is handled through a unified management structure under NASAs Aeronautics and Evaluation and Test Capability (AETC) project. The AETC facilities are; the 11x11 transonic and 9x7 supersonic wind tunnels at NASA Ames; the 10x10 and 8x6 supersonic wind tunnels, 9x15 low speed tunnel, Icing Research Tunnel, and Propulsion Simulator Laboratory, all at NASA Glenn; and the National Transonic Facility, Transonic Dynamics Tunnel, LAL aerothermodynamics laboratory, 8 High Temperature Tunnel, and 14x22 low speed tunnel, all at NASA Langley. This presentation describes the primary AETC facilities and their current capabilities, as well as improvements which are planned over the next five years. These improvements fall into three categories. The first are operations and maintenance improvements designed to increase the efficiency and reliability of the wind tunnels. These include new (possibly composite) fan blades at several facilities, new temperature control systems, and new and much more capable facility data systems. The second category of improvements are facility capability advancements. These include significant improvements to optical access in wind tunnel test sections at Ames, improvements to test section acoustics at Glenn and Langley, the development of a Supercooled Large Droplet capability for icing research, and the development of an icing capability for large engine testing. The final category of improvements consists of test technology enhancements which provide value across multiple facilities. These include projects to increase balance accuracy, provide NIST-traceable calibration characterization for wind tunnels, and to advance optical instruments for Computational Fluid Dynamics (CFD) validation. Taken as a whole, these individual projects provide significant enhancements to NASA capabilities in ground-based testing. They ensure that these wind tunnels will provide accurate and relevant experimental data for years to come, supporting both NASAs mission and the missions of our government and industry customers.

  14. Capital Ideas for Facilities Management.

    ERIC Educational Resources Information Center

    Golding, Stephen T.; Gordon, Janet; Gravina, Arthur

    2001-01-01

    Asserting that just like chief financial officers, higher education facilities specialists must maximize the long-term performance of assets under their care, describes strategies for strategic facilities management. Discusses three main approaches to facilities management (insourcing, cosourcing, and outsourcing) and where boards of trustees fit…

  15. Developing a NASA strategy for the verification of large space telescope observatories

    NASA Astrophysics Data System (ADS)

    Crooke, Julie A.; Gunderson, Johanna A.; Hagopian, John G.; Levine, Marie

    2006-06-01

    In July 2005, the Office of Program Analysis and Evaluation (PA&E) at NASA Headquarters was directed to develop a strategy for verification of the performance of large space telescope observatories, which occurs predominantly in a thermal vacuum test facility. A mission model of the expected astronomical observatory missions over the next 20 years was identified along with performance, facility and resource requirements. Ground testing versus alternatives was analyzed to determine the pros, cons and break points in the verification process. Existing facilities and their capabilities were examined across NASA, industry and other government agencies as well as the future demand for these facilities across NASA's Mission Directorates. Options were developed to meet the full suite of mission verification requirements, and performance, cost, risk and other analyses were performed. Findings and recommendations from the study were presented to the NASA Administrator and the NASA Strategic Management Council (SMC) in February 2006. This paper details the analysis, results, and findings from this study.

  16. 41 CFR 102-74.295 - Who determines the number of employee parking spaces for each facility?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Parking Facilities § 102-74.295 Who... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Who determines the number of employee parking spaces for each facility? 102-74.295 Section 102-74.295 Public Contracts and...

  17. Evaluation of Facility Management by Multivariate Statistics - Factor Analysis

    NASA Astrophysics Data System (ADS)

    Singovszki, Miloš; Vranayová, Zuzana

    2013-06-01

    Facility management is evolving, there is no exact than other sciences, although its development is fast forward. The knowledge and practical skills in facility management is not replaced, on the contrary, they complement each other. The existing low utilization of science in the field of facility management is mainly caused by the management of support activities are many variables and prevailing immediate reaction to the extraordinary situation arising from motives of those who have substantial experience and years of proven experience. Facility management is looking for a system that uses organized knowledge and will form the basis, which grows from a wide range of disciplines. Significant influence on its formation as a scientific discipline is the "structure, which follows strategy". The paper deals evaluate technology building as part of an facility management by multivariate statistic - factor analysis.

  18. Logistics Operations Management Center: Maintenance Support Baseline (LOMC-MSB)

    NASA Technical Reports Server (NTRS)

    Kurrus, R.; Stump, F.

    1995-01-01

    The Logistics Operations Management Center Maintenance Support Baseline is defined. A historical record of systems, applied to and deleted from, designs in support of future management and/or technical analysis is provided. All Flight elements, Ground Support Equipment, Facility Systems and Equipment and Test Support Equipment for which LOMC has responsibilities at Kennedy Space Center and other locations are listed. International Space Station Alpha Program documentation is supplemented. The responsibility of the Space Station Launch Site Support Office is established.

  19. Steve Nixon | NREL

    Science.gov Websites

    NREL. Steve has an extensive background in facilities engineering, facilities management, and Energy Manager, and a Project Management Professional. Prior to joining NREL, Steve was the Facilities manufacturing engineering, business application programming, and business process management positions

  20. New Trends in Facility Asset Management.

    ERIC Educational Resources Information Center

    Adams, Matt

    2000-01-01

    Explains new, positive trends in facility asset management that encompasses greater acceptance and involvement of facility managers in the financial planning process, greater awareness of the need for maintenance, and facility administrators taking a greater role with business officers. The new climate for alternative renewal financing proposals…

  1. Facility Accounting: Hammering Out a Capital Replacement Budget.

    ERIC Educational Resources Information Center

    Readinger, Jay

    1996-01-01

    Most facility and finance managers cannot adequately handle school infrastructure issues because they lack the tools to describe the problem appropriately. Facility accounting gives managers accurate deferral and projected replacement costs, using nationally recognized life-cycle and cost data. Facility accounting enables proper management of…

  2. Mission Control Center (MCC) System Specification for the Shuttle Orbital Flight Test (OFT) Timeframe

    NASA Technical Reports Server (NTRS)

    1976-01-01

    System specifications to be used by the mission control center (MCC) for the shuttle orbital flight test (OFT) time frame were described. The three support systems discussed are the communication interface system (CIS), the data computation complex (DCC), and the display and control system (DCS), all of which may interfere with, and share processing facilities with other applications processing supporting current MCC programs. The MCC shall provide centralized control of the space shuttle OFT from launch through orbital flight, entry, and landing until the Orbiter comes to a stop on the runway. This control shall include the functions of vehicle management in the area of hardware configuration (verification), flight planning, communication and instrumentation configuration management, trajectory, software and consumables, payloads management, flight safety, and verification of test conditions/environment.

  3. A guideline for interpersonal capabilities enhancement to support sustainable facility management practice

    NASA Astrophysics Data System (ADS)

    Sarpin, Norliana; Kasim, Narimah; Zainal, Rozlin; Noh, Hamidun Mohd

    2018-04-01

    Facility management is the key phase in the development cycle of an assets and spans over a considerable length of time. Therefore, facility managers are in a commanding position to maximise the potential of sustainability through the development phases from construction, operation, maintenance and upgrade leading to decommission and deconstruction. Sustainability endeavours in facility management practices will contribute to reducing energy consumption, waste and running costs. Furthermore, it can also help in improving organisational productivity, financial return and community standing of the organisation. Facility manager should be empowered with the necessary knowledge and capabilities at the forefront facing sustainability challenge. However, literature studies show a gap between the level of awareness, specific knowledge and the necessary skills required to pursue sustainability in the facility management professional. People capability is considered as the key enabler in managing the sustainability agenda as well as being central to the improvement of competency and innovation in an organisation. This paper aims to develop a guidelines for interpersonal capabilities to support sustainability in facility management practice. Starting with a total of 7 critical interpersonal capabilities factors identified from previous questionnaire survey, the authors conducted an interview with 3 experts in facility management to assess the perceived importance of these factors. The findings reveal a set of guidelines for the enhancement of interpersonal capabilities among facility managers by providing what can be done to acquire these factors and how it can support the application of sustainability in their practice. The findings of this paper are expected to form the basis of a mechanism framework developed to equip facility managers with the right knowledge, to continue education and training and to develop new mind-sets to enhance the implementation of sustainability measures in FM practices.

  4. Management of ethical issues related to care of seriously ill dialysis patients in free-standing facilities.

    PubMed

    Song, Mi-Kyung; Hanson, Laura C; Gilet, Constance A; Jo, Minjeong; Reed, Teresa J; Hladik, Gerald A

    2014-09-01

    There are few data on the frequency and current management of clinical ethical issues related to care of seriously ill dialysis patients in free-standing dialysis facilities. To examine the extent of clinical ethical challenges experienced by care providers in free-standing facilities and their perceptions about how those issues are managed. A total of 183 care providers recruited from 15 facilities in North Carolina completed a survey regarding the occurrence and management of ethical issues in the past year. Care plan meetings were observed at four of the facilities for three consecutive months. Also, current policies and procedures at each of the facilities were reviewed. The two most frequently experienced challenges involved dialyzing frail patients with multiple comorbidities and caring for disruptive/difficult patients. The most common ways of managing ethical issues were discussions in care plan meetings (n = 47) or discussions with the clinic manager (n = 47). Although policies were in place to guide management of some of the challenges, respondents were often not aware of those policies. Also, although participants reported that ethical issues related to dialyzing undocumented immigrants were fairly common, no facility had a policy for managing this challenge. Participants suggested that all staff obtain training in clinical ethics and communication skills, facilities develop ethics teams, and there be clear policies to guide management of ethical challenges. The scope of ethical challenges was extensive, how these challenges were managed varied widely, and there were limited resources for assistance. Multifaceted efforts, encompassing endeavors at the individual, facility, organization, and national levels, are needed to support staff in improving the management of ethical challenges in dialysis facilities. Copyright © 2014 American Academy of Hospice and Palliative Medicine. Published by Elsevier Inc. All rights reserved.

  5. Addressing social aspects associated with wastewater treatment facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Padilla-Rivera, Alejandro; Morgan-Sagastume, Juan Manuel; Noyola, Adalberto

    In wastewater treatment facilities (WWTF), technical and financial aspects have been considered a priority, while other issues, such as social aspects, have not been evaluated seriously and there is not an accepted methodology for assessing it. In this work, a methodology focused on social concerns related to WWTF is presented. The methodology proposes the use of 25 indicators as a framework for measuring social performance to evaluate the progress in moving towards sustainability. The methodology was applied to test its applicability and effectiveness in two WWTF in Mexico (urban and rural). This evaluation helped define the key elements, stakeholders andmore » barriers in the facilities. In this context, the urban facility showed a better overall performance, a result that may be explained mainly by the better socioeconomic context of the urban municipality. Finally, the evaluation of social aspects using the semi-qualitative approach proposed in this work allows for a comparison between different facilities and for the identification of strengths and weakness, and it provides an alternative tool for achieving and improving wastewater management. - Highlights: • The methodology proposes 25 indicators as a framework for measuring social performance in wastewater treatment facilities. • The evaluation helped to define the key elements, stakeholders and barriers in the wastewater treatment facilities. • The evaluation of social aspects allows the identification of strengths and weakness for improving wastewater management. • It provides a social profile of the facility that highlights the best and worst performances.« less

  6. 48 CFR 836.606-72 - Contract price.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... officer shall, after authorization by the Director, Office of Construction and Facilities Management, the Director, Office of Construction Management, or the facility or VISN director, as appropriate, terminate... Director, Office of Construction and Facilities Management, the Director, Office of Construction Management...

  7. 48 CFR 836.606-72 - Contract price.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... officer shall, after authorization by the Director, Office of Construction and Facilities Management, the Director, Office of Construction Management, or the facility or VISN director, as appropriate, terminate... Director, Office of Construction and Facilities Management, the Director, Office of Construction Management...

  8. 48 CFR 836.606-72 - Contract price.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... officer shall, after authorization by the Director, Office of Construction and Facilities Management, the Director, Office of Construction Management, or the facility or VISN director, as appropriate, terminate... Director, Office of Construction and Facilities Management, the Director, Office of Construction Management...

  9. 48 CFR 836.606-72 - Contract price.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... officer shall, after authorization by the Director, Office of Construction and Facilities Management, the Director, Office of Construction Management, or the facility or VISN director, as appropriate, terminate... Director, Office of Construction and Facilities Management, the Director, Office of Construction Management...

  10. 48 CFR 836.602-2 - Evaluation boards.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Management projects. The Director, Office of Construction and Facilities Management, shall appoint an... appropriate for the particular project. The Director, Office of Construction and Facilities Management may... Evaluation boards. (a) The Director, Office of Construction and Facilities Management, shall appoint an...

  11. Light Microscopy Module Imaging Tested and Demonstrated

    NASA Technical Reports Server (NTRS)

    Gati, Frank

    2004-01-01

    The Fluids Integrated Rack (FIR), a facility-class payload, and the Light Microscopy Module (LMM), a subrack payload, are integrated research facilities that will fly in the U.S. Laboratory module, Destiny, aboard the International Space Station. Both facilities are being engineered, designed, and developed at the NASA Glenn Research Center by Northrop Grumman Information Technology. The FIR is a modular, multiuser scientific research facility that is one of two racks that make up the Fluids and Combustion Facility (the other being the Combustion Integrated Rack). The FIR has a large volume dedicated for experimental hardware; easily reconfigurable diagnostics, power, and data systems that allow for unique experiment configurations; and customizable software. The FIR will also provide imagers, light sources, power management and control, command and data handling for facility and experiment hardware, and data processing and storage. The first payload in the FIR will be the LMM. The LMM integrated with the FIR is a remotely controllable, automated, on-orbit microscope subrack facility, with key diagnostic capabilities for meeting science requirements--including video microscopy to observe microscopic phenonema and dynamic interactions, interferometry to make thin-film measurements with nanometer resolution, laser tweezers to manipulate micrometer-sized particles, confocal microscopy to provide enhanced three-dimensional visualization of structures, and spectrophotometry to measure the photonic properties of materials. Vibration disturbances were identified early in the LMM development phase as a high risk for contaminating the science microgravity environment. An integrated FIR-LMM test was conducted in Glenn's Acoustics Test Laboratory to assess mechanical sources of vibration and their impact to microscopic imaging. The primary purpose of the test was to characterize the LMM response at the sample location, the x-y stage within the microscope, to vibration emissions from the FIR and LMM support structures.

  12. 41 CFR 102-74.320 - Are there any exceptions to the smoking policy for interior space in Federal facilities?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... to the smoking policy for interior space in Federal facilities? 102-74.320 Section 102-74.320 Public... MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Smoking § 102-74.320 Are there any exceptions to the smoking policy for interior space in Federal facilities? Yes, the smoking policy...

  13. 41 CFR 102-74.320 - Are there any exceptions to the smoking policy for interior space in Federal facilities?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... to the smoking policy for interior space in Federal facilities? 102-74.320 Section 102-74.320 Public... MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Smoking § 102-74.320 Are there any exceptions to the smoking policy for interior space in Federal facilities? Yes, the smoking policy...

  14. 41 CFR 102-74.320 - Are there any exceptions to the smoking policy for interior space in Federal facilities?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... to the smoking policy for interior space in Federal facilities? 102-74.320 Section 102-74.320 Public... MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Smoking § 102-74.320 Are there any exceptions to the smoking policy for interior space in Federal facilities? Yes, the smoking policy...

  15. 41 CFR 102-74.320 - Are there any exceptions to the smoking policy for interior space in Federal facilities?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... to the smoking policy for interior space in Federal facilities? 102-74.320 Section 102-74.320 Public... MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Smoking § 102-74.320 Are there any exceptions to the smoking policy for interior space in Federal facilities? Yes, the smoking policy...

  16. 41 CFR 102-74.320 - Are there any exceptions to the smoking policy for interior space in Federal facilities?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... to the smoking policy for interior space in Federal facilities? 102-74.320 Section 102-74.320 Public... MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Smoking § 102-74.320 Are there any exceptions to the smoking policy for interior space in Federal facilities? Yes, the smoking policy...

  17. Facilities to Support Beamed Energy Launch Testing at the Laser Hardened Materials Evaluation Laboratory (LHMEL)

    NASA Astrophysics Data System (ADS)

    Lander, Michael L.

    2003-05-01

    The Laser Hardened Materials Evaluation Laboratory (LHMEL) has been characterizing material responses to laser energy in support of national defense programs and the aerospace industry for the past 26 years. This paper reviews the overall resources available at LHMEL to support fundamental materials testing relating to impulse coupling measurement and to explore beamed energy launch concepts. Located at Wright-Patterson Air Force Base, Ohio, LHMEL is managed by the Air Force Research Laboratory Materials Directorate AFRL/MLPJ and operated by Anteon Corporation. The facility's advanced hardware is centered around carbon dioxide lasers producing output power up to 135kW and neodymium glass lasers producing up to 10 kilojoules of repetitively pulsed output. The specific capabilities of each laser device and related optical systems are discussed. Materials testing capabilities coupled with the laser systems are also described including laser output and test specimen response diagnostics. Environmental simulation capabilities including wind tunnels and large-volume vacuum chambers relevant to beamed energy propulsion are also discussed. This paper concludes with a summary of the procedures and methods by which the facility can be accessed.

  18. Nuclear Rocket Facility Decommissioning Project: Controlled Explosive Demolition of Neutron Activated Shield Wall

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Michael R. Kruzic

    2007-09-16

    Located in Area 25 of the Nevada Test Site (NTS), the Test Cell A (TCA) Facility was used in the early to mid-1960s for the testing of nuclear rocket engines, as part of the Nuclear Rocket Development Program, to further space travel. Nuclear rocket testing resulted in the activation of materials around the reactors and the release of fission products and fuel particles in the immediate area. Identified as Corrective Action Unit 115, the TCA facility was decontaminated and decommissioned (D&D) from December 2004 to July 2005 using the Streamlined Approach for Environmental Restoration (SAFER) process, under the ''Federal Facilitymore » Agreement and Consent Order''. The SAFER process allows environmental remediation and facility closure activities (i.e., decommissioning) to occur simultaneously provided technical decisions are made by an experienced decision maker within the site conceptual site model, identified in the Data Quality Objective process. Facility closure involved a seven-step decommissioning strategy. Key lessons learned from the project included: (1) Targeted preliminary investigation activities provided a more solid technical approach, reduced surprises and scope creep, and made the working environment safer for the D&D worker. (2) Early identification of risks and uncertainties provided opportunities for risk management and mitigation planning to address challenges and unanticipated conditions. (3) Team reviews provided an excellent mechanism to consider all aspects of the task, integrated safety into activity performance, increase team unity and ''buy-in'' and promoted innovative and time saving ideas. (4) Development of CED protocols ensured safety and control. (5) The same proven D&D strategy is now being employed on the larger ''sister'' facility, Test Cell C.« less

  19. A Program Management Framework for Facilities Managers

    ERIC Educational Resources Information Center

    King, Dan

    2012-01-01

    The challenge faced by senior facility leaders is not how to execute a single project, but rather, how to successfully execute a large program consisting of hundreds of projects. Senior facilities officers at universities, school districts, hospitals, airports, and other organizations with extensive facility inventories, typically manage project…

  20. Integrating repositories with fuel cycles: The airport authority model

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Forsberg, C.

    2012-07-01

    The organization of the fuel cycle is a legacy of World War II and the cold war. Fuel cycle facilities were developed and deployed without consideration of the waste management implications. This led to the fuel cycle model of a geological repository site with a single owner, a single function (disposal), and no other facilities on site. Recent studies indicate large economic, safety, repository performance, nonproliferation, and institutional incentives to collocate and integrate all back-end facilities. Site functions could include geological disposal of spent nuclear fuel (SNF) with the option for future retrievability, disposal of other wastes, reprocessing with fuelmore » fabrication, radioisotope production, other facilities that generate significant radioactive wastes, SNF inspection (navy and commercial), and related services such as SNF safeguards equipment testing and training. This implies a site with multiple facilities with different owners sharing some facilities and using common facilities - the repository and SNF receiving. This requires a different repository site institutional structure. We propose development of repository site authorities modeled after airport authorities. Airport authorities manage airports with government-owned runways, collocated or shared public and private airline terminals, commercial and federal military facilities, aircraft maintenance bases, and related operations - all enabled and benefiting the high-value runway asset and access to it via taxi ways. With a repository site authority the high value asset is the repository. The SNF and HLW receiving and storage facilities (equivalent to the airport terminal) serve the repository, any future reprocessing plants, and others with needs for access to SNF and other wastes. Non-public special-built roadways and on-site rail lines (equivalent to taxi ways) connect facilities. Airport authorities are typically chartered by state governments and managed by commissions with members appointed by the state governor, county governments, and city governments. This structure (1) enables state and local governments to work together to maximize job and tax benefits to local communities and the state, (2) provides a mechanism to address local concerns such as airport noise, and (3) creates an institutional structure with large incentives to maximize the value of the common asset, the runway. A repository site authority would have a similar structure and be the local interface to any national waste management authority. (authors)« less

  1. Knowledge and Adherence to the National Guidelines for Malaria Diagnosis in Pregnancy among Health-Care Providers and Drug-Outlet Dispensers in Rural Western Kenya.

    PubMed

    Riley, Christina; Dellicour, Stephanie; Ouma, Peter; Kioko, Urbanus; Omar, Ahmeddin; Kariuki, Simon; Ng'ang'a, Zipporah; Desai, Meghna; Buff, Ann M; Gutman, Julie R

    2018-05-01

    Prompt diagnosis and effective treatment of acute malaria in pregnancy (MiP) is important for the mother and fetus; data on health-care provider adherence to diagnostic guidelines in pregnancy are limited. From September to November 2013, a cross-sectional survey was conducted in 51 health facilities and 39 drug outlets in Western Kenya. Provider knowledge of national diagnostic guidelines for uncomplicated MiP were assessed using standardized questionnaires. The use of parasitologic testing was assessed in health facilities via exit interviews with febrile women of childbearing age and in drug outlets via simulated-client scenarios, posing as pregnant women or their spouses. Overall, 93% of providers tested for malaria or accurately described signs and symptoms consistent with clinical malaria. Malaria was parasitologically confirmed in 77% of all patients presenting with febrile illness at health facilities and 5% of simulated clients at drug outlets. Parasitological testing was available in 80% of health facilities; 92% of patients evaluated at these facilities were tested. Only 23% of drug outlets had malaria rapid diagnostic tests (RDTs); at these outlets, RDTs were offered in 17% of client simulations. No differences were observed in testing rates by pregnancy trimester. The study highlights gaps among health providers in diagnostic knowledge and practice related to MiP, and the lack of malaria diagnostic capacity, particularly in drug outlets. The most important factor associated with malaria testing of pregnant women was the availability of diagnostics at the point of service. Interventions that increase the availability of malaria diagnostic services might improve malaria case management in pregnant women.

  2. Proposed Space Flight Experiment Hardware

    NASA Technical Reports Server (NTRS)

    2003-01-01

    The primary thrust for this plan is to develop design tools and fundamental understanding that are timely and consistent with the goal of the various exploration initiatives. The plan will utilize ISS facilities, such as the Fluids Integrated Rack (FIR) and the Microgravity Science Glovebox (MSG). A preliminary flow schematic of Two-Phase Flow Facility (T(phi)FFy) which would utilize FIR is shown in Figure 3. MSG can be utilized to use the Boiling eXperiment Facility (BXF) and Contact Line Dynamics Experiment (CLiDE) Facility. The T(phi)FFy system would have multiple test sections whereby different configurations of heat exchangers could be used to study boiling and condensation phenomena. The test sections would be instrumented for pressure drop, void fraction, heat fluxes, temperatures, high-speed imaging and other diagnostics. Besides a high-speed data acquisition system with a large data storage capability, telemetry could be used to update control and test parameters and download limited amounts of data. In addition, there would be multiple accumulators that could be used to investigate system stability and fluid management issues. The system could accommodate adiabatic tests through either the space station nitrogen supply or have an experiment-specific compressor to pressurize a sufficient amount of air or other non-condensable gas for reuse as the supply bottle is depleted.

  3. 78 FR 7465 - Agency Information Collection Activities: Submission for the Office of Management and Budget (OMB...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-01

    ..., and applicants for facility (i.e., nuclear power and non-power research and test reactor) operating... the final supporting statement, at the NRC's Public Document Room, Room O-1F21, One White Flint North...

  4. Ecological solid fuels, effective heating devices for communal management and their testing methods

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kubica, K.

    1995-12-31

    The national balance of primary energy consumption is almost 90% based upon coal. Coal is used not only in electricity production, but also in the communal sector - in heating facilities comprising chiefly local boiler houses and private households.

  5. South African HIV self-testing policy and guidance considerations.

    PubMed

    Venter, Francois; Majam, Mohammed; Jankelowitz, Lauren; Adams, Siraaj; Moorhouse, Michelle; Carmona, Sergio; Stevens, Wendy; Msimanga, Busisiwe R; Allen, David; Balani, Pooja; Nevhutalu, Zwoitwaho; Rhagnath, Naleni; Shroufi, Amir; Devillé, Walter; Kazangarare, Victoria; van der Wiel, Renee; Templeman, Hugo; Puren, Adrian; Tucker, Tim; van Cutsem, Gilles; Conradie, Francesca; Dong, Krista; Chidarikire, Thato; Gray, Andy

    2017-01-01

    The gap in HIV testing remains significant and new modalities such as HIV self-testing (HIVST) have been recommended to reach key and under-tested populations. In December 2016, the World Health Organization (WHO) released the Guidelines on HIV Self-Testing and Partner Notification: A Supplement to the Consolidated Guidelines on HIV Testing Services (HTS) and urged member countries to develop HIVST policy and regulatory frameworks. In South Africa, HIVST was included as a supplementary strategy in the National HIV Testing Services Policy in 2016, and recently, guidelines for HIVST were included in the South African National Strategic Plan for HIV, sexually transmitted infections and tuberculosis 2017-2022. This document serves as an additional guidance for the National HIV Testing Services Policy 2016, with specific focus on HIVST. It is intended for policy advocates, clinical and non-clinical HTS providers, health facility managers and healthcare providers in private and public health facilities, non-governmental, community-based and faith-based organisations involved in HTS and outreach, device manufacturers, workplace programmes and institutes of higher education.

  6. Integration Process for Payloads in the Fluids and Combustion Facility

    NASA Technical Reports Server (NTRS)

    Free, James M.; Nall, Marsha M.

    2001-01-01

    The Fluids and Combustion Facility (FCF) is an ISS research facility located in the United States Laboratory (US Lab), Destiny. The FCF is a multi-discipline facility that performs microgravity research primarily in fluids physics science and combustion science. This facility remains on-orbit and provides accommodations to multi-user and Principal investigator (PI) unique hardware. The FCF is designed to accommodate 15 PI's per year. In order to allow for this number of payloads per year, the FCF has developed an end-to-end analytical and physical integration process. The process includes provision of integration tools, products and interface management throughout the life of the payload. The payload is provided with a single point of contact from the facility and works with that interface from PI selection through post flight processing. The process utilizes electronic tools for creation of interface documents/agreements, storage of payload data and rollup for facility submittals to ISS. Additionally, the process provides integration to and testing with flight-like simulators prior to payload delivery to KSC. These simulators allow the payload to test in the flight configuration and perform final facility interface and science verifications. The process also provides for support to the payload from the FCF through the Payload Safety Review Panel (PSRP). Finally, the process includes support in the development of operational products and the operation of the payload on-orbit.

  7. Ground facility for information reception, processing, dissemination and scientific instruments management setup in the CORONAS-PHOTON space project

    NASA Astrophysics Data System (ADS)

    Buslov, A. S.; Kotov, Yu. D.; Yurov, V. N.; Bessonov, M. V.; Kalmykov, P. A.; Oreshnikov, E. M.; Alimov, A. M.; Tumanov, A. V.; Zhuchkova, E. A.

    2011-06-01

    This paper deals with the organizational structure of ground-based receiving, processing, and dissemination of scientific information created by the Astrophysics Institute of the Scientific Research Nuclear University, Moscow Engineering Physics Institute. Hardware structure and software features are described. The principles are given for forming sets of control commands for scientific equipment (SE) devices, and statistics data are presented on the operation of facility during flight tests of the spacecraft (SC) in the course of one year.

  8. 25 CFR 170.806 - What is an IRR Transportation Facilities Maintenance Management System?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... AND WATER INDIAN RESERVATION ROADS PROGRAM BIA Road Maintenance § 170.806 What is an IRR Transportation Facilities Maintenance Management System? An IRR Transportation Facilities Maintenance Management... 25 Indians 1 2010-04-01 2010-04-01 false What is an IRR Transportation Facilities Maintenance...

  9. 41 CFR 102-74.70 - Are commercial vendors and nonprofit organizations required to operate vending facilities by...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Are commercial vendors and nonprofit organizations required to operate vending facilities by permit or contractual...

  10. Planning and Managing the Campus Facilities Portfolio

    ERIC Educational Resources Information Center

    Daigneau, William A., Ed.

    2003-01-01

    The campus and facilities of a college should be managed using the same principles as any other investment in an institution's financial portfolio. Stemming from the APPA/National Association of College & University Business Officers (NACUBO) Institute for Facilities Finance, this book addresses the totality of managing the facilities investment…

  11. The ICCB Computer Based Facilities Inventory & Utilization Management Information Subsystem.

    ERIC Educational Resources Information Center

    Lach, Ivan J.

    The Illinois Community College Board (ICCB) Facilities Inventory and Utilization subsystem, a part of the ICCB management information system, was designed to provide decision makers with needed information to better manage the facility resources of Illinois community colleges. This subsystem, dependent upon facilities inventory data and course…

  12. 18. Topside facility, interior of facility manager's room, view towards ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    18. Topside facility, interior of facility manager's room, view towards west. Lyon - Whiteman Air Force Base, Oscar O-1 Minuteman Missile Alert Facility, Southeast corner of Twelfth & Vendenberg Avenues, Knob Noster, Johnson County, MO

  13. Meeting the challenges of bringing a new base facility operation model to Gemini Observatory

    NASA Astrophysics Data System (ADS)

    Nitta, Atsuko; Arriagada, Gustavo; Adamson, A. J.; Cordova, Martin; Nunez, Arturo; Serio, Andrew; Kleinman, Scot

    2016-08-01

    The aim of the Gemini Observatory's Base Facilities Project is to provide the capabilities to perform routine night time operations with both telescopes and their instruments from their respective base facilities without anyone present at the summit. Tightening budget constraints prompted this project as both a means to save money and an opportunity to move toward increasing remote operations in the future. We successfully moved Gemini North nighttime operation to our base facility in Hawaii in Nov., 2015. This is the first 8mclass telescope to completely move night time operations to base facility. We are currently working on implementing BFO to Gemini South. Key challenges for this project include: (1) This is a schedule driven project. We have to implement the new capabilities by the end of 2015 for Gemini North and end of 2016 for Gemini South. (2) The resources are limited and shared with operations which has the higher priority than our project. (3) Managing parallel work within the project. (4) Testing, commissioning and introducing new tools to operational systems without adding significant disruptions to nightly operations. (5) Staff buying to the new operational model. (6) The staff involved in the project are spread on two locations separated by 10,000km, seven time zones away from each other. To overcome these challenges, we applied two principles: "Bare Minimum" and "Gradual Descent". As a result, we successfully completed the project ahead of schedule at Gemini North Telescope. I will discuss how we managed the cultural and human aspects of the project through these concepts. The other management aspects will be presented by Gustavo Arriagada [2], the Project Manager of this project. For technical details, please see presentations from Andrew Serio [3] and Martin Cordova [4].

  14. Sport Facility Planning and Management. Sport Management Library.

    ERIC Educational Resources Information Center

    Farmer, Peter J.; Mulrooney, Aaron L.; Ammon, Rob, Jr.

    Students of sports facilities management will need to acquire a wide variety of managerial skills and knowledge in order to be adequately prepared to plan and manage these facilities. This textbook offers students a mix of practical examples and recognized theory to help them in the planning, constructing, promoting, and managing of sports…

  15. An Application of Business Process Management to Health Care Facilities.

    PubMed

    Hassan, Mohsen M D

    The purpose of this article is to help health care facility managers and personnel identify significant elements of their facilities to address, and steps and actions to follow, when applying business process management to them. The ABPMP (Association of Business Process Management Professionals) life-cycle model of business process management is adopted, and steps from Lean, business process reengineering, and Six Sigma, and actions from operations management are presented to implement it. Managers of health care facilities can find in business process management a more comprehensive approach to improving their facilities than Lean, Six Sigma, business process reengineering, and ad hoc approaches that does not conflict with them because many of their elements can be included under its umbrella. Furthermore, the suggested application of business process management can guide and relieve them from selecting among these approaches, as well as provide them with specific steps and actions that they can follow. This article fills a gap in the literature by presenting a much needed comprehensive application of business process management to health care facilities that has specific steps and actions for implementation.

  16. Environmental Management

    ScienceCinema

    None

    2018-01-16

    Another key aspect of the NNSS mission is Environmental Management program, which addresses the environmental legacy from historic nuclear weapons related activities while also ensuring the health and safety of present day workers, the public, and the environment as current and future missions are completed. The Area 5 Radioactive Waste Management site receives low-level and mixed low-level waste from some 28 different generators from across the DOE complex in support of the legacy clean-up DOE Environmental Management project. Without this capability, the DOE would not be able to complete the clean up and proper disposition of these wastes. The program includes environmental protection, compliance, and monitoring of the air, water, plants, animals, and cultural resources at the NNSS. Investigation and implementation of appropriate corrective actions to address the contaminated ground water facilities and soils resulting from historic nuclear testing activities, the demolition of abandoned nuclear facilities, as well as installation of ground water wells to identify and monitor the extent of ground water contamination.

  17. Computer assisted operations in Petroleum Development Oman (PDO)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Al-Hinai, S.H.; Mutimer, K.

    1995-10-01

    Petroleum Development Oman (PDO) currently produces some 750,000 bopd and 900,000 bwpd from some 74 fields in a large geographical area and diverse operating conditions. A key corporate objective is to reduce operating costs by exploiting productivity gains from proven technology. Automation is seen as a means of managing the rapid growth of well population and production facilities. the overall objective is to improve field management through continuous monitoring of wells and facilities and dissemination of data throughout the whole organization. A major upgrade of PDO`s field Supervisory Control and Data Acquisition (SCADA) system is complete providing a platform tomore » exploit new initiatives particularly for production optimization of artificial lift systems and automatic well testing using multi selector valves, coriolis flow meter measurements and multi component (oil, gas, water) flowmeter. The paper describes PDO`s experience including benefits and challenges which have to be managed when developing Computer Assisted Operations (CAO).« less

  18. Development of an integrated transuranic waste management system for a large research facility: NUCEF

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mineo, Hideaki; Matsumura, Tatsuro; Takeshita, Isao

    1997-03-01

    The Nuclear Fuel Cycle Safety Engineering Research Facility (NUCEF) is a large complex of research facilities where transuranic (TRU) elements are used. Liquid and solid waste containing TRU elements is generated mainly in the treatment of fuel for critical experiments and in the research of reprocessing and TRU waste management in hot cells and glove boxes. The rational management of TRU wastes is a very important issue not only for NUCEF but also for Japan. An integrated TRU waste management system is being developed with NUCEF as the test bed. The basic policy for establishing the system is to classifymore » wastes by TRU concentration, to reduce waste volume, and to maximize reuse of TRU elements. The principal approach of the development program is to apply the outcomes of the research carried out in NUCEF. Key technologies are TRU measurement for classification of solid wastes and TRU separation and volume reduction for organic and aqueous wastes. Some technologies required for treating the wastes specific to the research activities in NUCEF need further development. Specifically, the separation and stabilization technologies for americium recovery from concentrated aqueous waste, which is generated in dissolution of mixed oxide when preparing fuel for critical experiments, needs further research.« less

  19. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Agogino, Karen; Sanchez, Rebecca

    Tonopah Test Range (TTR) in Nevada and Kauai Test Facility (KTF) in Hawaii are government-owned, contractor-operated facilities operated by Sandia Corporation (Sandia), a wholly owned subsidiary of Lockheed Martin Corporation. The U.S. Department of Energy (DOE)/National Nuclear Security Administration (NNSA), through the Sandia Site Offi ce (SSO), in Albuquerque, NM, administers the contract and oversees contractor operations at TTR and KTF. Sandia manages and conducts operations at TTR in support of the DOE/NNSA’s Weapons Ordnance Program and has operated the site since 1957. Washington Group International subcontracts to Sandia in administering most of the environmental programs at TTR. Sandia operatesmore » KTF as a rocket preparation launching and tracking facility. This Annual Site Environmental Report (ASER) summarizes data and the compliance status of the environmental protection and monitoring program at TTR and KTF through Calendar Year (CY) 2007. The compliance status of environmental regulations applicable at these sites include state and federal regulations governing air emissions, wastewater effluent, waste management, terrestrial surveillance, and Environmental Restoration (ER) cleanup activities. Sandia is responsible only for those environmental program activities related to its operations. The DOE/NNSA/Nevada Site Offi ce (NSO) retains responsibility for the cleanup and management of ER TTR sites. Currently, there are no ER Sites at KTF. Environmental monitoring and surveillance programs are required by DOE Order 450.1, Environmental Protection Program (DOE 2007a) and DOE Manual 231.1-1A, Environment, Safety, and Health Reporting Manual (DOE 2007).« less

  20. An automated calibration laboratory for flight research instrumentation: Requirements and a proposed design approach

    NASA Technical Reports Server (NTRS)

    Oneill-Rood, Nora; Glover, Richard D.

    1990-01-01

    NASA's Dryden Flight Research Facility (Ames-Dryden), operates a diverse fleet of research aircraft which are heavily instrumented to provide both real time data for in-flight monitoring and recorded data for postflight analysis. Ames-Dryden's existing automated calibration (AUTOCAL) laboratory is a computerized facility which tests aircraft sensors to certify accuracy for anticipated harsh flight environments. Recently, a major AUTOCAL lab upgrade was initiated; the goal of this modernization is to enhance productivity and improve configuration management for both software and test data. The new system will have multiple testing stations employing distributed processing linked by a local area network to a centralized database. The baseline requirements for the new AUTOCAL lab and the design approach being taken for its mechanization are described.

  1. KSC-07pd0921

    NASA Image and Video Library

    2007-04-17

    KENNEDY SPACE CENTER, FLA. -- After a test flight of the Starfighter F-104, Jim Ball, KSC Spaceport Development manager, addresses the media. Behind him are Pilot Rick Svetkoff; Al Wassel, a representative from the FAA Office of Commercial Space; and Bill Parsons, director of Kennedy Space Center. The aircraft is taking part in a series of pathfinder test missions from the space shuttle runway. Two flights will generate test data to validate sonic boom assumptions about the potential impacts of suborbital and orbital commercial spaceflight from the facility. NASA is assessing the environmental impact of such flights. Starfighters Inc. of Clearwater, Fla., will perform the flights to help in assessing suborbital space launch trajectories from the runway and paving the way for future commercial space tourism and research flights from the facility. Photo credit: NASA/Kim Shiflett

  2. Phase 2 testing results of immobilization of WTP effluent management facility vaporator bottoms simulant

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Reigel, M.; Cozzi, A.; McCabe, D.

    2017-09-08

    The Hanford Waste Treatment and Immobilization Plant (WTP) Low Activity Waste (LAW) vitrification facility will generate an aqueous condensate recycle stream (LAW Melter Off-Gas Condensate) from the primary off-gas system. This work examined three waste form formulations based on previous testing with related simulants: 8 wt% ordinary portland cement (OPC), 47 wt% blast furnace slag (BFS), 45 wt% fly ash (FA) known as Cast Stone formulation; 20 wt% Aquaset® II-GH and 80 wt% BFS; 20 wt% OPC and 80 wt% BFS. These tests successfully produced one waste form that set within five days (Cast Stone formulation); however the other twomore » formulations, Aquaset® II-GH/BFS and OPC/BFS, took approximately eight and fourteen days to set, respectively.« less

  3. Morpheus Alhat Tether Test Preparations

    NASA Image and Video Library

    2014-03-27

    CAPE CANAVERAL, Fla. – Engineers and technicians prepare the Project Morpheus prototype lander for a tether test near a new launch site at the north end of the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida. The launch pad was moved to a different location at the landing facility to support the next phase of flight testing. Project Morpheus tests NASA’s automated landing and hazard avoidance technology, or ALHAT, and an engine that runs on liquid oxygen and methane, or green propellants, into a fully-operational lander that could deliver cargo to other planetary surfaces. The landing facility provides the lander with the kind of field necessary for realistic testing, complete with rocks, craters and hazards to avoid. Morpheus’ ALHAT payload allows it to navigate to clear landing sites amidst rocks, craters and other hazards during its descent. Project Morpheus is being managed under the Advanced Exploration Systems, or AES, Division in NASA’s Human Exploration and Operations Mission Directorate. The efforts in AES pioneer new approaches for rapidly developing prototype systems, demonstrating key capabilities and validating operational concepts for future human missions beyond Earth orbit. For more information on Project Morpheus, visit http://morpheuslander.jsc.nasa.gov/. Photo credit: NASA/Ben Smegelsky

  4. Morpheus Alhat Tether Test Preparations

    NASA Image and Video Library

    2014-03-27

    CAPE CANAVERAL, Fla. – NASA's Project Morpheus prototype lander is positioned near a new launch site at the north end of the Shuttle Landing Facility at NASA’s Kennedy Space Center in Florida for a tether test. The launch pad was moved to a different location at the landing facility to support the next phase of flight testing. Project Morpheus tests NASA’s automated landing and hazard avoidance technology, or ALHAT, and an engine that runs on liquid oxygen and methane, or green propellants, into a fully-operational lander that could deliver cargo to other planetary surfaces. The landing facility provides the lander with the kind of field necessary for realistic testing, complete with rocks, craters and hazards to avoid. Morpheus’ ALHAT payload allows it to navigate to clear landing sites amidst rocks, craters and other hazards during its descent. Project Morpheus is being managed under the Advanced Exploration Systems, or AES, Division in NASA’s Human Exploration and Operations Mission Directorate. The efforts in AES pioneer new approaches for rapidly developing prototype systems, demonstrating key capabilities and validating operational concepts for future human missions beyond Earth orbit. For more information on Project Morpheus, visit http://morpheuslander.jsc.nasa.gov/. Photo credit: NASA/Ben Smegelsky

  5. Morpheus Alhat Tether Test Preparations

    NASA Image and Video Library

    2014-03-27

    CAPE CANAVERAL, Fla. – A technician prepares the Project Morpheus prototype lander for a tether test near a new launch site at the north end of the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida. The launch pad was moved to a different location at the landing facility to support the next phase of flight testing. Project Morpheus tests NASA’s automated landing and hazard avoidance technology, or ALHAT, and an engine that runs on liquid oxygen and methane, or green propellants, into a fully-operational lander that could deliver cargo to other planetary surfaces. The landing facility provides the lander with the kind of field necessary for realistic testing, complete with rocks, craters and hazards to avoid. Morpheus’ ALHAT payload allows it to navigate to clear landing sites amidst rocks, craters and other hazards during its descent. Project Morpheus is being managed under the Advanced Exploration Systems, or AES, Division in NASA’s Human Exploration and Operations Mission Directorate. The efforts in AES pioneer new approaches for rapidly developing prototype systems, demonstrating key capabilities and validating operational concepts for future human missions beyond Earth orbit. For more information on Project Morpheus, visit http://morpheuslander.jsc.nasa.gov/. Photo credit: NASA/Ben Smegelsky

  6. Facility Management as a Way of Reducing Costs in Transport Companies

    NASA Astrophysics Data System (ADS)

    Matusova, Dominika; Gogolova, Martina

    2017-10-01

    For facility management exists a several interpretations. These interpretations emerged progressively. At the time of the notion of facility management was designed to manage an administrative building, in the United States (US). They can ensure their operation and maintenance. From the US, this trend is further moved to Europe and now it start becoming a current and actual topic also in Slovakia. Facility management is contractually agreed scheme of services, semantically recalls traditional building management. There by finally pushed for activities related to real estates. For facility management is fundamental - certification and certification systems. Therefore, is essential to know, the cost structure of certification. The most commonly occurring austerity measures include: heat pumps, use of renewable energy, solar panels and water savings. These measures can reduce the cost.

  7. 48 CFR 970.3770-1 - Policy.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Facilities Management Contracting 970.3770-1 Policy. Contractors managing Department of Energy (DOE) facilities shall be required to comply with the DOE Directives applicable to facilities management. [65 FR 81009, Dec. 22, 2000, as amended at 74 FR 36374, July 22, 2009] ...

  8. Lymphocytic Choriomeningitis Virus in Employees and Mice at Multipremises Feeder-Rodent Operation, United States, 2012

    PubMed Central

    Ströher, Ute; Edison, Laura; Albariño, César G.; Lovejoy, Jodi; Armeanu, Emilian; House, Jennifer; Cory, Denise; Horton, Clayton; Fowler, Kathy L.; Austin, Jessica; Poe, John; Humbaugh, Kraig E.; Guerrero, Lisa; Campbell, Shelley; Gibbons, Aridth; Reed, Zachary; Cannon, Deborah; Manning, Craig; Petersen, Brett; Metcalf, Douglas; Marsh, Bret; Nichol, Stuart T.; Rollin, Pierre E.

    2014-01-01

    We investigated the extent of lymphocytic choriomeningitis virus (LCMV) infection in employees and rodents at 3 commercial breeding facilities. Of 97 employees tested, 31 (32%) had IgM and/or IgG to LCMV, and aseptic meningitis was diagnosed in 4 employees. Of 1,820 rodents tested in 1 facility, 382 (21%) mice (Mus musculus) had detectable IgG, and 13 (0.7%) were positive by reverse transcription PCR; LCMV was isolated from 8. Rats (Rattus norvegicus) were not found to be infected. S-segment RNA sequence was similar to strains previously isolated in North America. Contact by wild mice with colony mice was the likely source for LCMV, and shipments of infected mice among facilities spread the infection. The breeding colonies were depopulated to prevent further human infections. Future outbreaks can be prevented with monitoring and management, and employees should be made aware of LCMV risks and prevention. PMID:24447605

  9. SSC OCIO, IT SUMMIT 2011

    NASA Technical Reports Server (NTRS)

    Cottrell, Dinna L.

    2011-01-01

    The Stennis Space Center (SSC) Records Retention Facility is a centralized location for all SSC records, Records Management staff, and the SSC History Office. The building is a storm resistant facility and provides a secure environment for records housing. The Records Retention Facility was constructed in accordance with The National Archives and Records Administration (NARA) requirements for records storage, making it the first NARA compliant facility in the agency. Stennis Space Center's Records Retention Facility became operational in May 2010. The SSC Records Retention Facility ensures that the required federal records are preserved, managed and accessible to all interested personnel. The facility provides 20,000 cubic feet of records storage capacity for the purpose of managing the centers consolidated records within a central, protected environment. Records housed in the facility are in the form of paper, optical, film and magnetic media. Located within the SSC Records Retention Facility, the Records Management Office provides comprehensive records management services in the form of: a) Storage and life-cycle management of inactive records of all media types; b) Digitizing/scanning of records and documents; c) Non-textual/digital electronic records media storage, migration and transfer; d) Records Remediation.

  10. 30 CFR 285.824 - How must I conduct self-inspections?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Section 285.824 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, REGULATION, AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE RENEWABLE ENERGY ALTERNATE USES OF EXISTING FACILITIES ON THE OUTER... months; (2) The type of inspection employed, (i.e., visual, magnetic particle, ultrasonic testing); and...

  11. 75 FR 55159 - Science and Technology Reinvention Laboratory (STRL) Personnel Management Demonstration Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-09

    .... Above GS-15 Positions B. Classification 1. Occupational Series 2. Classification Standards and Position... Duty Locations Appendix B: Occupational Series by Occupational Family Appendix C: Intervention Model..., MD; Lakehurst, NJ; and Orlando, FL. These facilities support research, development, test, evaluation...

  12. 40 CFR 266.202 - Definition of solid waste.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... MANAGEMENT FACILITIES Military Munitions § 266.202 Definition of solid waste. (a) A military munition is not... personnel or explosives and munitions emergency response specialists (including training in proper destruction of unused propellant or other munitions); or (ii) Use in research, development, testing, and...

  13. 40 CFR 266.202 - Definition of solid waste.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... MANAGEMENT FACILITIES Military Munitions § 266.202 Definition of solid waste. (a) A military munition is not... personnel or explosives and munitions emergency response specialists (including training in proper destruction of unused propellant or other munitions); or (ii) Use in research, development, testing, and...

  14. 40 CFR 266.202 - Definition of solid waste.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... MANAGEMENT FACILITIES Military Munitions § 266.202 Definition of solid waste. (a) A military munition is not... personnel or explosives and munitions emergency response specialists (including training in proper destruction of unused propellant or other munitions); or (ii) Use in research, development, testing, and...

  15. New Ideas on Facilities Management.

    ERIC Educational Resources Information Center

    Grimm, James C.

    1986-01-01

    Examines trends in facilities management relating to products and people. Reviews new trends in products, including processes, techniques, and programs that are being expounded by business and industry. Discusses the "people factors" involved in facilities management. (ABB)

  16. Mitigating risks related to facilities management.

    PubMed

    O'Neill, Daniel P; Scarborough, Sydney

    2013-07-01

    By looking at metrics focusing on the functionality, age, capital investment, transparency, and sustainability (FACTS) of their organizations' facilities, facilities management teams can build potential business cases to justify upgrading the facilities. A FACTS analysis can ensure that capital spent on facilities will produce a higher or more certain ROI than alternatives. A consistent process for managing spending helps to avoid unexpected spikes that cost the enterprise more in the long run.

  17. Space Launch System, Core Stage, Structural Test Design and Implementation

    NASA Technical Reports Server (NTRS)

    Shaughnessy, Ray

    2017-01-01

    As part of the National Aeronautics and Space Administration's (NASA) Space Launch System (SLS) Program, engineers at NASA's Marshall Space Flight Center (MSFC) in Huntsville, Alabama are working to design, develop and implement the SLS Core Stage structural testing. The SLS will have the capability to return humans to the Moon and beyond and its first launch is scheduled for December of 2017. The SLS Core Stage consist of five major elements; Forward Skirt, Liquid Oxygen (LOX) tank, Intertank (IT), Liquid Hydrogen (LH2) tank and the Engine Section (ES). Structural Test Articles (STA) for each of these elements are being designed and produced by Boeing at Michoud Assembly Facility located in New Orleans, La. The structural test for the Core Stage STAs (LH2, LOX, IT and ES) are to be conducted by the MSFC Test Laboratory. Additionally, the MSFC Test Laboratory manages the Structural Test Equipment (STE) design and development to support the STAs. It was decided early (April 2012) in the project life that the LH2 and LOX tank STAs would require new test stands and the Engine Section and Intertank would be tested in existing facilities. This decision impacted schedules immediately because the new facilities would require Construction of Facilities (C of F) funds that require congressional approval and long lead times. The Engine Section and Intertank structural test are to be conducted in existing facilities which will limit lead times required to support the first launch of SLS. With a SLS launch date of December, 2017 Boeing had a need date for testing to be complete by September of 2017 to support flight certification requirements. The test facilities were required to be ready by October of 2016 to support test article delivery. The race was on to get the stands ready before Test Article delivery and meet the test complete date of September 2017. This paper documents the past and current design and development phases and the supporting processes, tools, and methodology for supporting the SLS Core Stage STA test stands and related STE. The paper will address key requirements, system development activities and project challenges. Additionally, the interrelationships as well as interdependencies within the SLS project will be discussed.

  18. 7 CFR 1951.224 - Third party agreements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... sufficient control by the borrower over the operation, maintenance, and management of the facility to assure... over its assets and/or over the operation, management, and maintenance of the facility to the extent... of a facility to be operated, maintained or managed by a third party under a contract, management...

  19. Joint Assessment of Renewable Energy and Water Desalination Research Center (REWDC) Program Capabilities and Facilities In Radioactive Waste Management

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bissani, M; Fischer, R; Kidd, S

    2006-04-03

    The primary goal of this visit was to perform a joint assessment of the Renewable Energy and Water Desalination Center's (REWDC) program in radioactive waste management. The visit represented the fourth technical and scientific interaction with Libya under the DOE/NNSA Sister Laboratory Arrangement. Specific topics addressed during the visit focused on Action Sheet P-05-5, ''Radioactive Waste Management''. The Team, comprised of Mo Bissani (Team Lead), Robert Fischer, Scott Kidd, and Jim Merrigan, consulted with REWDC management and staff. The team collected information, discussed particulars of the technical collaboration and toured the Tajura facility. The tour included the waste treatment facility,more » waste storage/disposal facility, research reactor facility, hot cells and analytical labs. The assessment team conducted the first phase of Task A for Action Sheet 5, which involved a joint assessment of the Radioactive Waste Management Program. The assessment included review of the facilities dedicated to the management of radioactive waste at the Tourja site, the waste management practices, proposed projects for the facility and potential impacts on waste generation and management.« less

  20. Thermal Vacuum Integrated System Test at B-2

    NASA Technical Reports Server (NTRS)

    Kudlac, Maureen T.; Weaver, Harold F.; Cmar, Mark D.

    2012-01-01

    The National Aeronautics and Space Administration (NASA) Glenn Research Center (GRC) Plum Brook Station (PBS) Space Propulsion Research Facility, commonly referred to as B-2, is NASA s third largest thermal vacuum facility. It is the largest designed to store and transfer large quantities of liquid hydrogen and liquid oxygen, and is perfectly suited to support developmental testing of chemical propulsion systems as well as fully integrated stages. The facility is also capable of providing thermal-vacuum simulation services to support testing of large lightweight structures, Cryogenic Fluid Management (CFM) systems, electric propulsion test programs, and other In-Space propulsion programs. A recently completed integrated system test demonstrated the refurbished thermal vacuum capabilities of the facility. The test used the modernized data acquisition and control system to monitor the facility during pump down of the vacuum chamber, operation of the liquid nitrogen heat sink (or cold wall) and the infrared lamp array. A vacuum level of 1.3x10(exp -4)Pa (1x10(exp -6)torr) was achieved. The heat sink provided a uniform temperature environment of approximately 77 K (140deg R) along the entire inner surface of the vacuum chamber. The recently rebuilt and modernized infrared lamp array produced a nominal heat flux of 1.4 kW/sq m at a chamber diameter of 6.7 m (22 ft) and along 11 m (36 ft) of the chamber s cylindrical vertical interior. With the lamp array and heat sink operating simultaneously, the thermal systems produced a heat flux pattern simulating radiation to space on one surface and solar exposure on the other surface. The data acquired matched pretest predictions and demonstrated system functionality.

  1. Wind Tunnel Management and Resource Optimization: A Systems Modeling Approach

    NASA Technical Reports Server (NTRS)

    Jacobs, Derya, A.; Aasen, Curtis A.

    2000-01-01

    Time, money, and, personnel are becoming increasingly scarce resources within government agencies due to a reduction in funding and the desire to demonstrate responsible economic efficiency. The ability of an organization to plan and schedule resources effectively can provide the necessary leverage to improve productivity, provide continuous support to all projects, and insure flexibility in a rapidly changing environment. Without adequate internal controls the organization is forced to rely on external support, waste precious resources, and risk an inefficient response to change. Management systems must be developed and applied that strive to maximize the utility of existing resources in order to achieve the goal of "faster, cheaper, better". An area of concern within NASA Langley Research Center was the scheduling, planning, and resource management of the Wind Tunnel Enterprise operations. Nine wind tunnels make up the Enterprise. Prior to this research, these wind tunnel groups did not employ a rigorous or standardized management planning system. In addition, each wind tunnel unit operated from a position of autonomy, with little coordination of clients, resources, or project control. For operating and planning purposes, each wind tunnel operating unit must balance inputs from a variety of sources. Although each unit is managed by individual Facility Operations groups, other stakeholders influence wind tunnel operations. These groups include, for example, the various researchers and clients who use the facility, the Facility System Engineering Division (FSED) tasked with wind tunnel repair and upgrade, the Langley Research Center (LaRC) Fabrication (FAB) group which fabricates repair parts and provides test model upkeep, the NASA and LARC Strategic Plans, and unscheduled use of the facilities by important clients. Expanding these influences horizontally through nine wind tunnel operations and vertically along the NASA management structure greatly increases the complexity of developing a model that can be used for successfully implementing a standardized management planning tool. The objective of this study was to implement an Integrated Wind Tunnel Planning System to improve the operations within the aeronautics testing and research group, in particular Wind Tunnel Enterprise. The study included following steps: Conducted literature search and expert discussions (NASA and Old Dominion University faculty), Performed environmental scan of NASA Langley wind tunnel operations as foundation for problem definition. Established operation requirements and evaluation methodologies. Examined windtunnel operations to map out the common characteristics, critical components, and system structure. Reviewed and evaluated various project scheduling and management systems for implementation, Evaluated and implemented "Theory of Constraints (TOC)" project scheduling methodology at NASA Langley wind tunnel operations together with NASA staff.

  2. Risk based requirements for long term stewardship: A proof-of-principle analysis of an analytic method tested on selected Hanford locations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jarvis, T.T.; Andrews, W.B.; Buck, J.W.

    1998-03-01

    Since 1989, the Department of Energy`s (DOE) Environmental Management (EM) Program has managed the environmental legacy of US nuclear weapons production, research and testing at 137 facilities in 31 states and one US territory. The EM program has conducted several studies on the public risks posed by contaminated sites at these facilities. In Risks and the Risk Debate [DOE, 1995a], the Department analyzed the risks at sites before, during, and after remediation work by the EM program. The results indicated that aside from a few urgent risks, most hazards present little inherent risk because physical and active site management controlsmore » limit both the releases of site contaminants, and public access to these hazards. Without these controls, these sites would pose greater risks to the public. Past risk reports, however, provided little information about post-cleanup risk, primarily because of uncertainty about future site uses and site characteristics at the end of planned cleanup activities. This is of concern because in many cases current cleanup technologies, and remedies, will last a shorter period of time than the waste itself and the resulting contamination will remain hazardous.« less

  3. Assessing infection control practices to protect health care workers and patients in Malawi from nosocomial transmission of Mycobacterium tuberculosis

    PubMed Central

    Simon, Katherine; Hosseinipour, Mina; Kim, Maria H.; Mlauzi, Lameck; Kazembe, Peter N.; Ahmed, Saeed

    2017-01-01

    Transmission of Mycobacterium tuberculosis (TB) in health settings threatens health care workers and people living with HIV in sub-Saharan Africa. Nosocomial transmission is reduced with implementation of infection control (IC) guidelines. The objective of this study is to describe implementation of TB IC measures in Malawi. We conducted a cross-sectional study utilizing anonymous health worker questionnaires, semi-structured interviews with facility managers, and direct observations at 17 facilities in central Malawi. Of 592 health care workers surveyed, 34% reported that all patients entering the facility were screened for cough and only 8% correctly named the four most common signs and symptoms of TB in adults. Of 33 managers interviewed, 7 (21%) and 1 (3%) provided the correct TB screening questions for use in adults and children, respectively. Of 592 health workers, only 2.4% had been screened for TB in the previous year. Most (90%) reported knowing their HIV status, 53% were tested at their facility of employment, and half reported they would feel comfortable receiving ART or TB treatment at their facility of employment. We conclude that screening is infrequently conducted and knowledge gaps may undercut its effectiveness. Further, health care workers do not routinely access TB and HIV diagnostic and treatment services at their facility of employment. PMID:29211793

  4. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hermeston, Mark W.

    BPA proposes total vegetation management (bareground) in the electrical substations, and, noxious weed management and maintenance of landscaping within the property boundaries of the listed facilities. These facilities are all located within the Covington District of the Snohomish Region. BPA proposes to manage vegetation inside and around electrical substations and associated facilities. Vegetation management within the substations will include bareground management by herbicides of all areas within the fenced perimeter of the facility including a bareground zone of up to 3 meters (10 feet) outside of the fenced area. The management of vegetation outside the substation and associated facilities willmore » include: 1) bare ground management of perimeter roads and parking areas; 2) control of noxious weeds throughout property boundaries; 3) mowing, fertilizing, and weed control of landscaped lawn and mulched areas; 4) weed control in ornamental shrub areas; and 5) areas requiring only mechanical control to manage unwanted/danger trees, grasses, and shrubs.« less

  5. Take-home lead exposure among children with relatives employed at a battery recycling facility - Puerto Rico, 2011.

    PubMed

    2012-11-30

    The recycling of lead has increased during the past 20 years, with more workers and their families potentially being exposed to lead from recycling facilities, including facilities that recycle lead-acid batteries. During November 2010-May 2011, four voluntary blood lead screening clinics for children of employees of a battery recycling facility in Puerto Rico were conducted. A total of 227 persons from 78 families had blood lead tests. Among 68 children aged <6 years, 11 (16%) had confirmed blood lead levels (BLLs) ≥10 µg/dL, the BLL at which CDC recommended individual intervention to reduce BLLs in 2010, and 39 (57%) children aged <6 years had venous or capillary BLLs ≥5 µg/dL, the reference value for elevated BLLs in children established by CDC in 2012. To determine whether take-home lead exposure contributed to the children's BLLs of ≥10 µg/dL, vehicle and household environmental samples were collected and analyzed. Eighty-five percent of vehicle dust samples and 49% of home dust samples exceeded the U.S. Environmental Protection Agency (EPA) level of concern of ≥40 µg/ft² (430.6 µg/m²) [corrected]. EPA began clean-up of employee homes and vehicles, focusing first on homes with children with BLLs ≥10 µg/dL. EPA also required that the company set up shower facilities, shoe washes, and clean changing areas at the battery recycling facility. Lastly, CDC assigned a case manager to provide education, environmental follow-up, and case management of all children with BLLs ≥5 µg/dL. On average, children's BLLs have decreased 9.9 µg/dL since being enrolled in case management.

  6. Patterns and predictors of malaria care-seeking, diagnostic testing, and artemisinin-based combination therapy for children under five with fever in Northern Nigeria: a cross-sectional study.

    PubMed

    Millar, Kathryn R; McCutcheon, Jennifer; Coakley, Eugenie H; Brieger, William; Ibrahim, Mohammed A; Mohammed, Zainab; Bassi, Amos; Sambisa, William

    2014-11-21

    Despite recent improvements in malaria prevention strategies, malaria case management remains a weakness in Northern Nigeria, which is underserved and suffers the country's highest rates of under-five child mortality. Understanding malaria care-seeking patterns and comparing case management outcomes to World Health Organization (WHO) and Nigeria's National Malaria Control Programme (NMCP) guidelines are necessary to identify where policy and programmatic strategies should focus to prevent malaria mortality and morbidity. A cross-sectional survey based on lot quality assurance sampling was used to collect data on malaria care-seeking for children under five with fever in the last two weeks throughout Sokoto and Bauchi States. The survey assessed if the child received NMCP/WHO recommended case management: prompt treatment, a diagnostic blood test, and artemisinin-based combination therapy (ACT). Deviations from this pathway and location of treatment were also assessed. Lastly, logistic regression was used to assess predictors of seeking treatment. Overall, 76.7% of children were brought to treatment-45.5% to a patent medicine vendor and 43.8% to a health facility. Of children brought to treatment, 61.5% sought treatment promptly, but only 9.8% received a diagnostic blood test and 7.2% received a prompt ACT. When assessing adherence to the complete case management pathway, only 1.0% of children received NMCP/WHO recommended treatment. When compared to other treatment locations, health facilities provided the greatest proportion of children with NMCP/WHO recommended treatment. Lastly, children 7-59 months old were at 1.74 (p = 0.003) greater odds of receiving treatment than children ≤6 months. Northern Nigeria's coverage rates of NMCP/WHO standard malaria case management for children under five with fever fall short of the NMCP goal of 80% coverage by 2010 and universal coverage thereafter. Given the ability to treat a child with malaria differs greatly between treatment locations, policy and logistics planning should address the shortages of essential malaria supplies in recommended and frequently accessed treatment locations. Particular emphasis should be placed on integrating the private sector into standardized care and educating caregivers on the necessity for testing before treatment and the availability of free ACT in public health facilities for uncomplicated malaria.

  7. Health and Safety Management for Small-scale Methane Fermentation Facilities

    NASA Astrophysics Data System (ADS)

    Yamaoka, Masaru; Yuyama, Yoshito; Nakamura, Masato; Oritate, Fumiko

    In this study, we considered health and safety management for small-scale methane fermentation facilities that treat 2-5 ton of biomass daily based on several years operation experience with an approximate capacity of 5 t·d-1. We also took account of existing knowledge, related laws and regulations. There are no qualifications or licenses required for management and operation of small-scale methane fermentation facilities, even though rural sewerage facilities with a relative similar function are required to obtain a legitimate license. Therefore, there are wide variations in health and safety consciousness of the operators of small-scale methane fermentation facilities. The industrial safety and health laws are not applied to the operation of small-scale methane fermentation facilities. However, in order to safely operate a small-scale methane fermentation facility, the occupational safety and health management system that the law recommends should be applied. The aims of this paper are to clarify the risk factors in small-scale methane fermentation facilities and encourage planning, design and operation of facilities based on health and safety management.

  8. 10 CFR Appendix F to Part 50 - Policy Relating to the Siting of Fuel Reprocessing Plants and Related Waste Management Facilities

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... and Related Waste Management Facilities F Appendix F to Part 50 Energy NUCLEAR REGULATORY COMMISSION... Relating to the Siting of Fuel Reprocessing Plants and Related Waste Management Facilities 1. Public health... facilities for the temporary storage of highlevel radioactive wastes, may be located on privately owned...

  9. 10 CFR Appendix F to Part 50 - Policy Relating to the Siting of Fuel Reprocessing Plants and Related Waste Management Facilities

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... and Related Waste Management Facilities F Appendix F to Part 50 Energy NUCLEAR REGULATORY COMMISSION... Relating to the Siting of Fuel Reprocessing Plants and Related Waste Management Facilities 1. Public health... facilities for the temporary storage of highlevel radioactive wastes, may be located on privately owned...

  10. 10 CFR Appendix F to Part 50 - Policy Relating to the Siting of Fuel Reprocessing Plants and Related Waste Management Facilities

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... and Related Waste Management Facilities F Appendix F to Part 50 Energy NUCLEAR REGULATORY COMMISSION... Relating to the Siting of Fuel Reprocessing Plants and Related Waste Management Facilities 1. Public health... facilities for the temporary storage of highlevel radioactive wastes, may be located on privately owned...

  11. 41 CFR 102-74.315 - What is the smoking policy for interior space in Federal facilities?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What is the smoking... REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Smoking § 102-74.315 What is the smoking... and members of the public visiting or using Federal facilities. The smoking of tobacco products is...

  12. 41 CFR 102-74.315 - What is the smoking policy for interior space in Federal facilities?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 41 Public Contracts and Property Management 3 2013-07-01 2013-07-01 false What is the smoking... REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Smoking § 102-74.315 What is the smoking... and members of the public visiting or using Federal facilities. The smoking of tobacco products is...

  13. 41 CFR 102-74.315 - What is the smoking policy for interior space in Federal facilities?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 41 Public Contracts and Property Management 3 2012-01-01 2012-01-01 false What is the smoking... REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Smoking § 102-74.315 What is the smoking... and members of the public visiting or using Federal facilities. The smoking of tobacco products is...

  14. 41 CFR 102-74.315 - What is the smoking policy for interior space in Federal facilities?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 41 Public Contracts and Property Management 3 2014-01-01 2014-01-01 false What is the smoking... REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Smoking § 102-74.315 What is the smoking... and members of the public visiting or using Federal facilities. The smoking of tobacco products is...

  15. 41 CFR 102-74.315 - What is the smoking policy for interior space in Federal facilities?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false What is the smoking... REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Smoking § 102-74.315 What is the smoking... and members of the public visiting or using Federal facilities. The smoking of tobacco products is...

  16. Web-Based Software for Managing Research

    NASA Technical Reports Server (NTRS)

    Hoadley, Sherwood T.; Ingraldi, Anthony M.; Gough, Kerry M.; Fox, Charles; Cronin, Catherine K.; Hagemann, Andrew G.; Kemmerly, Guy T.; Goodman, Wesley L.

    2007-01-01

    aeroCOMPASS is a software system, originally designed to aid in the management of wind tunnels at Langley Research Center, that could be adapted to provide similar aid to other enterprises in which research is performed in common laboratory facilities by users who may be geographically dispersed. Included in aeroCOMPASS is Web-interface software that provides a single, convenient portal to a set of project- and test-related software tools and other application programs. The heart of aeroCOMPASS is a user-oriented document-management software subsystem that enables geographically dispersed users to easily share and manage a variety of documents. A principle of "write once, read many" is implemented throughout aeroCOMPASS to eliminate the need for multiple entry of the same information. The Web framework of aeroCOMPASS provides links to client-side application programs that are fully integrated with databases and server-side application programs. Other subsystems of aeroCOMPASS include ones for reserving hardware, tracking of requests and feedback from users, generating interactive notes, administration of a customer-satisfaction questionnaire, managing execution of tests, managing archives of metadata about tests, planning tests, and providing online help and instruction for users.

  17. Test Area C-62 Final Range Environmental Assessment at Eglin Air Force Base, Florida

    DTIC Science & Technology

    2015-06-05

    requirements to submit with EPCRA reports. Federal agencies must comply. Air Armament Center Plan 32-3; January 2004; Asbestos Management Plan; This...plan establishes procedures for the Eglin Air Force Base (AFB) facility asbestos management program. It contains the policies and procedures used in...controlling the health hazards created by asbestos containing materials (ACM), and the procedures used in ACM removal required to protect the health

  18. Technical accomplishments of the NASA Lewis Research Center, 1989

    NASA Technical Reports Server (NTRS)

    1990-01-01

    Topics addressed include: high-temperature composite materials; structural mechanics; fatigue life prediction for composite materials; internal computational fluid mechanics; instrumentation and controls; electronics; stirling engines; aeropropulsion and space propulsion programs, including a study of slush hydrogen; space power for use in the space station, in the Mars rover, and other applications; thermal management; plasma and radiation; cryogenic fluid management in space; microgravity physics; combustion in reduced gravity; test facilities and resources.

  19. Metrics for Success: Strategies for Enabling Core Facility Performance and Assessing Outcomes

    PubMed Central

    Hockberger, Philip E.; Meyn, Susan M.; Nicklin, Connie; Tabarini, Diane; Auger, Julie A.

    2016-01-01

    Core Facilities are key elements in the research portfolio of academic and private research institutions. Administrators overseeing core facilities (core administrators) require assessment tools for evaluating the need and effectiveness of these facilities at their institutions. This article discusses ways to promote best practices in core facilities as well as ways to evaluate their performance across 8 of the following categories: general management, research and technical staff, financial management, customer base and satisfaction, resource management, communications, institutional impact, and strategic planning. For each category, we provide lessons learned that we believe contribute to the effective and efficient overall management of core facilities. If done well, we believe that encouraging best practices and evaluating performance in core facilities will demonstrate and reinforce the importance of core facilities in the research and educational mission of institutions. It will also increase job satisfaction of those working in core facilities and improve the likelihood of sustainability of both facilities and personnel. PMID:26848284

  20. Metrics for Success: Strategies for Enabling Core Facility Performance and Assessing Outcomes.

    PubMed

    Turpen, Paula B; Hockberger, Philip E; Meyn, Susan M; Nicklin, Connie; Tabarini, Diane; Auger, Julie A

    2016-04-01

    Core Facilities are key elements in the research portfolio of academic and private research institutions. Administrators overseeing core facilities (core administrators) require assessment tools for evaluating the need and effectiveness of these facilities at their institutions. This article discusses ways to promote best practices in core facilities as well as ways to evaluate their performance across 8 of the following categories: general management, research and technical staff, financial management, customer base and satisfaction, resource management, communications, institutional impact, and strategic planning. For each category, we provide lessons learned that we believe contribute to the effective and efficient overall management of core facilities. If done well, we believe that encouraging best practices and evaluating performance in core facilities will demonstrate and reinforce the importance of core facilities in the research and educational mission of institutions. It will also increase job satisfaction of those working in core facilities and improve the likelihood of sustainability of both facilities and personnel.

  1. Feasibility study for a transportation operations system cask maintenance facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rennich, M.J.; Medley, L.G.; Attaway, C.R.

    The US Department of Energy (DOE), Office of Civilian Radioactive Waste Management (OCRWM) is responsible for the development of a waste management program for the disposition of spent nuclear fuel (SNF) and high-level waste (HLW). The program will include a transportation system for moving the nuclear waste from the sources to a geologic repository for permanent disposal. Specially designed casks will be used to safely transport the waste. The cask systems must be operated within limits imposed by DOE, the Nuclear Regulatory Commission (NRC), and the Department of Transportation (DOT). A dedicated facility for inspecting, testing, and maintaining the caskmore » systems was recommended by the General Accounting Office (in 1979) as the best means of assuring their operational effectiveness and safety, as well as regulatory compliance. In November of 1987, OCRWM requested a feasibility study be made of a Cask Maintenance Facility (CMF) that would perform the required functions. 46 refs., 16 figs., 13 tabs.« less

  2. Wageningen UR Unmanned Aerial Remote Sensing Facility - Overview of activities

    NASA Astrophysics Data System (ADS)

    Bartholomeus, Harm; Keesstra, Saskia; Kooistra, Lammert; Suomalainen, Juha; Mucher, Sander; Kramer, Henk; Franke, Jappe

    2016-04-01

    To support environmental management there is an increasing need for timely, accurate and detailed information on our land. Unmanned Aerial Systems (UAS) are increasingly used to monitor agricultural crop development, habitat quality or urban heat efficiency. An important reason is that UAS technology is maturing quickly while the flexible capabilities of UAS fill a gap between satellite based and ground based geo-sensing systems. In 2012, different groups within Wageningen University and Research Centre have established an Unmanned Airborne Remote Sensing Facility. The objective of this facility is threefold: a) To develop innovation in the field of remote sensing science by providing a platform for dedicated and high-quality experiments; b) To support high quality UAS services by providing calibration facilities and disseminating processing procedures to the UAS user community; and c) To promote and test the use of UAS in a broad range of application fields like habitat monitoring, precision agriculture and land degradation assessment. The facility is hosted by the Laboratory of Geo-Information Science and Remote Sensing (GRS) and the Department of Soil Physics and Land Management (SLM) of Wageningen University together with the team Earth Informatics (EI) of Alterra. The added value of the Unmanned Aerial Remote Sensing Facility is that compared to for example satellite based remote sensing more dedicated science experiments can be prepared. This includes for example higher frequent observations in time (e.g., diurnal observations), observations of an object under different observation angles for characterization of BRDF and flexibility in use of camera's and sensors types. In this way, laboratory type of set ups can be tested in a field situation and effects of up-scaling can be tested. In the last years we developed and implemented different camera systems (e.g. a hyperspectral pushbroom system, and multispectral frame cameras) which we operated in projects all around the world, while new camera systems are being planned such as LiDAR and a full frame hyperspectral camera. In the presentation we will give an overview of our activities, ranging from erosion studies, decision support for precision agriculture, determining leaf biochemistry and canopy structure in tropical forests to the mapping of coastal zones.

  3. 30 CFR 585.824 - How must I conduct self-inspections?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Section 585.824 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE RENEWABLE ENERGY AND ALTERNATE USES OF EXISTING FACILITIES ON THE OUTER CONTINENTAL SHELF Environmental and... inspection employed, (i.e., visual, magnetic particle, ultrasonic testing); and (3) A summary of the...

  4. 30 CFR 585.824 - How must I conduct self-inspections?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Section 585.824 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE RENEWABLE ENERGY AND ALTERNATE USES OF EXISTING FACILITIES ON THE OUTER CONTINENTAL SHELF Environmental and... inspection employed, (i.e., visual, magnetic particle, ultrasonic testing); and (3) A summary of the...

  5. 30 CFR 585.824 - How must I conduct self-inspections?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Section 585.824 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE RENEWABLE ENERGY AND ALTERNATE USES OF EXISTING FACILITIES ON THE OUTER CONTINENTAL SHELF Environmental and... inspection employed, (i.e., visual, magnetic particle, ultrasonic testing); and (3) A summary of the...

  6. 40 CFR 261.151 - Wording of the instruments.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... Guarantor meets or exceeds the financial test criteria and agrees to comply with the reporting requirements... (CONTINUED) IDENTIFICATION AND LISTING OF HAZARDOUS WASTE Financial Requirements for Management of Excluded... has elected to establish a trust to provide all or part of such financial assurance for the facilities...

  7. 30 CFR 285.605 - What is a Site Assessment Plan (SAP)?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Section 285.605 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, REGULATION, AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE RENEWABLE ENERGY ALTERNATE USES OF EXISTING FACILITIES ON THE OUTER... your commercial lease, including your project easement, or to test technology devices. (1) Your SAP...

  8. Challenges of Field Testing The Traffic Monitoring Advisor in an Operational Air Traffic Control Facility

    DOT National Transportation Integrated Search

    1997-01-01

    The Traffic Management Advisor (TMA), the sequence and schedule tool of the : Center/TRACON Automation System (CTAS), was evaluated at the Fort Worth Center : (ZFW) in the summer of 1996. This paper describes the challenges encountered : during the v...

  9. Adherence to malaria diagnosis and treatment guidelines among healthcare workers in Ogun State, Nigeria.

    PubMed

    Bamiselu, Oluyomi F; Ajayi, IkeOluwapo; Fawole, Olufunmilayo; Dairo, David; Ajumobi, Olufemi; Oladimeji, Abisola; Steven, Yoon

    2016-08-19

    Malaria case management remains a vital component of malaria control strategies. Despite the introduction of national malaria treatment guidelines and scale-up of malaria control interventions in Nigeria, anecdotal evidence shows some deviations from the guidelines in malaria case management. This study assessed factors influencing adherence to malaria diagnosis and treatment guidelines among healthcare workers in public and private sectors in Ogun State, Nigeria. A comparative cross-sectional study was carried out among 432 (216 public and 216 private) healthcare workers selected from nine Local Government Areas using a multistage sampling technique. A pre-tested interviewer administered questionnaire was used to collect information on availability and use of malaria Rapid Diagnostic Test (mRDT) and artemisinin combination therapy (ACT), for management of uncomplicated malaria. Adherence was defined as when choice of antimalarials for parasitological confirmed malaria cases was restricted to recommended antimalarial medicines. Association between adherence and independent variables were tested using Chi-square at 5 % level of significance. Malaria RDT was available in 81.9 % of the public health facilities and 19.4 % of the private health facilities (p = 0.001). Its use was higher among public healthcare workers (85.2 %) compared to 32.9 % in private facilities (p = 0.000). Presumptive diagnosis of malaria was higher among private healthcare workers (94.9 %) compared to 22.7 % public facilities (p = <0.0001). The main reason for non-usage of mRDT among private healthcare workers was its perceived unreliability of mRDT (40.9 %). Monotherapy including artesunate (58.3 % vs 12.5 %), amodiaquine (38.9 % vs 8.3 %) and chloroquine (26.4 % vs 4.2 %) were significantly more available in private than public health facilities, respectively. Adherence to guidelines was significantly higher among public healthcare workers (60.6 %) compared to those in private facilities (27.3 %). Availability of antimalarial medicine was the main factor that influenced treatment prescription in both healthcare settings (p = 0.27). However, drug promotion by manufactures (45.8 %) has a major influence on private healthcare workers' prescription practice. The findings of this study demonstrate significant difference between public and private healthcare workers on adherence to national malaria diagnosis and treatment guidelines. Interventions to improve private sector engagement in implementation of the guidelines, training and supply of recommended antimalarial medicines should be intensified.

  10. 41 CFR 102-76.60 - To which facilities does the Architectural Barriers Act apply?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 41 Public Contracts and Property Management 3 2012-01-01 2012-01-01 false To which facilities does... Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 76-DESIGN AND CONSTRUCTION Architectural Barriers Act § 102-76.60 To which facilities does the...

  11. 41 CFR 102-76.60 - To which facilities does the Architectural Barriers Act apply?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false To which facilities does... Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 76-DESIGN AND CONSTRUCTION Architectural Barriers Act § 102-76.60 To which facilities does the...

  12. 41 CFR 102-76.60 - To which facilities does the Architectural Barriers Act apply?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 41 Public Contracts and Property Management 3 2013-07-01 2013-07-01 false To which facilities does... Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 76-DESIGN AND CONSTRUCTION Architectural Barriers Act § 102-76.60 To which facilities does the...

  13. 41 CFR 102-76.60 - To which facilities does the Architectural Barriers Act apply?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 41 Public Contracts and Property Management 3 2014-01-01 2014-01-01 false To which facilities does... Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 76-DESIGN AND CONSTRUCTION Architectural Barriers Act § 102-76.60 To which facilities does the...

  14. 41 CFR 102-74.280 - Are privately owned vehicles converted for propane carburetion permitted in underground parking...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Parking... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Are privately owned vehicles converted for propane carburetion permitted in underground parking facilities? 102-74.280 Section...

  15. 41 CFR 102-76.60 - To which facilities does the Architectural Barriers Act apply?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false To which facilities does... Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 76-DESIGN AND CONSTRUCTION Architectural Barriers Act § 102-76.60 To which facilities does the...

  16. Barriers to providing palliative care in long-term care facilities

    PubMed Central

    Brazil, Kevin; Bédard, Michel; Krueger, Paul; Taniguchi, Alan; Kelley, Mary Lou; McAiney, Carrie; Justice, Christopher

    2006-01-01

    OBJECTIVE To assess challenges in providing palliative care in long-term care (LTC) facilities from the perspective of medical directors. DESIGN Cross-sectional mailed survey. A questionnaire was developed, reviewed, pilot-tested, and sent to 450 medical directors representing 531 LTC facilities. Responses were rated on 2 different 5-point scales. Descriptive analyses were conducted on all responses. SETTING All licensed LTC facilities in Ontario with designated medical directors. PARTICIPANTS Medical directors in the facilities. MAIN OUTCOME MEASURES Demographic and practice characteristics of physicians and facilities, importance of potential barriers to providing palliative care, strategies that could be helpful in providing palliative care, and the kind of training in palliative care respondents had received. RESULTS Two hundred seventy-five medical directors (61%) representing 302 LTC facilities (57%) responded to the survey. Potential barriers to providing palliative care were clustered into 3 groups: facility staff’s capacity to provide palliative care, education and support, and the need for external resources. Two thirds of respondents (67.1%) reported that inadequate staffing in their facilities was an important barrier to providing palliative care. Other barriers included inadequate financial reimbursement from the Ontario Health Insurance Program (58.5%), the heavy time commitment required (47.3%), and the lack of equipment in facilities (42.5%). No statistically significant relationship was found between geographic location or profit status of facilities and barriers to providing palliative care. Strategies respondents would use to improve provision of palliative care included continuing medical education (80.0%), protocols for assessing and monitoring pain (77.7%), finding ways to increase financial reimbursement for managing palliative care residents (72.1%), providing educational material for facility staff (70.7%), and providing practice guidelines related to assessing and managing palliative care patients (67.8%). CONCLUSION Medical directors in our study reported that their LTC facilities were inadequately staffed and lacked equipment. The study also highlighted the specialized role of medical directors, who identified continuing medical education as a key strategy for improving provision of palliative care. PMID:17327890

  17. Barriers to providing palliative care in long-term care facilities.

    PubMed

    Brazil, Kevin; Bédard, Michel; Krueger, Paul; Taniguchi, Alan; Kelley, Mary Lou; McAiney, Carrie; Justice, Christopher

    2006-04-01

    To assess challenges in providing palliative care in long-term care (LTC) facilities from the perspective of medical directors. Cross-sectional mailed survey. A questionnaire was developed, reviewed, pilot-tested, and sent to 450 medical directors representing 531 LTC facilities. Responses were rated on 2 different 5-point scales. Descriptive analyses were conducted on all responses. All licensed LTC facilities in Ontario with designated medical directors. Medical directors in the facilities. Demographic and practice characteristics of physicians and facilities, importance of potential barriers to providing palliative care, strategies that could be helpful in providing palliative care, and the kind of training in palliative care respondents had received. Two hundred seventy-five medical directors (61%) representing 302 LTC facilities (57%) responded to the survey. Potential barriers to providing palliative care were clustered into 3 groups: facility staff's capacity to provide palliative care, education and support, and the need for external resources. Two thirds of respondents (67.1%) reported that inadequate staffing in their facilities was an important barrier to providing palliative care. Other barriers included inadequate financial reimbursement from the Ontario Health Insurance Program (58.5%), the heavy time commitment required (47.3%), and the lack of equipment in facilities (42.5%). No statistically significant relationship was found between geographic location or profit status of facilities and barriers to providing palliative care. Strategies respondents would use to improve provision of palliative care included continuing medical education (80.0%), protocols for assessing and monitoring pain (77.7%), finding ways to increase financial reimbursement for managing palliative care residents (72.1%), providing educational material for facility staff (70.7%), and providing practice guidelines related to assessing and managing palliative care patients (67.8%). Medical directors in our study reported that their LTC facilities were inadequately staffed and lacked equipment. The study also highlighted the specialized role of medical directors, who identified continuing medical education as a key strategy for improving provision of palliative care.

  18. Towards a Tool for Malaria Supply Chain Management Improvement in Rural Ghana.

    PubMed

    Carlo, Lorena; Bakken, Suzanne; Mamykina, Lena; Kodie, Richmond; Kanter, Andrew S

    2015-01-01

    The maintenance of adequate quantities of antimalarial medicines and rapid diagnostic tests (RDTs) at health facilities in rural areas of sub-Saharan Africa is a challenging task because of poor supply chain management. Antimalarial stock-outs in the communities could lead patients (that need to travel long distances to get medications) to remain untreated, develop severe malaria and die. A prototype to improve the management of health commodities in rural Ghana through the visualization of current stock levels and the forecasting of commodities is proposed.

  19. The development of an airborne information management system for flight test

    NASA Technical Reports Server (NTRS)

    Bever, Glenn A.

    1992-01-01

    An airborne information management system is being developed at the NASA Dryden Flight Research Facility. This system will improve the state of the art in management data acquisition on-board research aircraft. The design centers around highly distributable, high-speed microprocessors that allow data compression, digital filtering, and real-time analysis. This paper describes the areas of applicability, approach to developing the system, potential for trouble areas, and reasons for this development activity. System architecture (including the salient points of what makes it unique), design philosophy, and tradeoff issues are also discussed.

  20. Morpheus Campaign 2A Tether Test

    NASA Image and Video Library

    2014-03-27

    CAPE CANAVERAL, Fla. – NASA's Project Morpheus prototype lander is positioned near a new launch site at the north end of the Shuttle Landing Facility at NASA’s Kennedy Space Center in Florida for a tethered test. The test will be performed to verify the lander's recently installed autonomous landing and hazard avoidance technology, or ALHAT, sensors and integration system. The launch pad was moved to a different location at the landing facility to support the next phase of flight testing. Project Morpheus tests NASA’s ALHAT, and an engine that runs on liquid oxygen and methane, or green propellants, into a fully-operational lander that could deliver cargo to other planetary surfaces. The landing facility provides the lander with the kind of field necessary for realistic testing, complete with rocks, craters and hazards to avoid. Morpheus’ ALHAT payload allows it to navigate to clear landing sites amidst rocks, craters and other hazards during its descent. Project Morpheus is being managed under the Advanced Exploration Systems, or AES, Division in NASA’s Human Exploration and Operations Mission Directorate. The efforts in AES pioneer new approaches for rapidly developing prototype systems, demonstrating key capabilities and validating operational concepts for future human missions beyond Earth orbit. For more information on Project Morpheus, visit http://morpheuslander.jsc.nasa.gov/. Photo credit: NASA/Glenn Benson

  1. Greening Federal Facilities: An Energy, Environmental, and Economic Resource Guide for Federal Facility Managers and Designers; Second Edition

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wilson, A.

    2001-05-16

    Greening Federal Facilities, Second Edition, is a nuts-and-bolts resource guide compiled to increase energy and resource efficiency, cut waste, and improve the performance of Federal buildings and facilities. The guide highlights practical actions that facility managers, design and construction staff, procurement officials, and facility planners can take to save energy and money, improve the comfort and productivity of employees, and benefit the environment. It supports a national effort to promote energy and environmental efficiency in the nation's 500,000 Federal buildings and facilities. Topics covered include current Federal regulations; environmental and energy decision-making; site and landscape issues; building design; energy systems;more » water and wastewater; materials; waste management, and recycling; indoor environmental quality; and managing buildings.« less

  2. A framework for managing core facilities within the research enterprise.

    PubMed

    Haley, Rand

    2009-09-01

    Core facilities represent increasingly important operational and strategic components of institutions' research enterprises, especially in biomolecular science and engineering disciplines. With this realization, many research institutions are placing more attention on effectively managing core facilities within the research enterprise. A framework is presented for organizing the questions, challenges, and opportunities facing core facilities and the academic units and institutions in which they operate. This framework is intended to assist in guiding core facility management discussions in the context of a portfolio of facilities and within the overall institutional research enterprise.

  3. Research on the Construction Management and Sustainable Development of Large-Scale Scientific Facilities in China

    NASA Astrophysics Data System (ADS)

    Guiquan, Xi; Lin, Cong; Xuehui, Jin

    2018-05-01

    As an important platform for scientific and technological development, large -scale scientific facilities are the cornerstone of technological innovation and a guarantee for economic and social development. Researching management of large-scale scientific facilities can play a key role in scientific research, sociology and key national strategy. This paper reviews the characteristics of large-scale scientific facilities, and summarizes development status of China's large-scale scientific facilities. At last, the construction, management, operation and evaluation of large-scale scientific facilities is analyzed from the perspective of sustainable development.

  4. [The state of quality management implementation in ambulatory care nursing and inpatient nursing].

    PubMed

    Farin, E; Hauer, J; Schmidt, E; Kottner, J; Jäckel, W H

    2013-02-01

    The demands being made on quality assurance and quality management in ambulatory care nursing and inpatient nursing facilities continue to grow. As opposed to health-care facilities such as hospitals and rehabilitation centres, we know of no other empirical studies addressing the current state of affairs in quality management in nursing institutions. The aim of this investigation was, by means of a questionnaire, to analyse the current (as of spring 2011) dissemination of quality management and certification in nursing facilities using a random sample as representative as possible of in- and outpatient institutions. To obtain our sample we compiled 800 inpatient and 800 outpatient facilities as a stratified random sample. Federal state, holder and, for inpatient facilities, the number of beds were used as stratification variables. 24% of the questionnaires were returned, giving us information on 188 outpatient and 220 inpatient institutions. While the distribution in the sample of outpatient institutions is equivalent to the population distribution, we observed discrepancies in the inpatient facilities sample. As they do not seem to be related to any demonstrable bias, we assume that our data are sufficiently representative. 4 of 5 of the responding facilities claim to employ their own quality management system, however the degree to which the quality management mechanisms are actually in use is an estimated 75%. Almost 90% of all the facilities have a quality management representative who often possesses specific additional qualifications. Many relevant quality management instruments (i. e., nursing standards of care, questionnaires, quality circles) are used in 75% of the responding institutions. Various factors in our data give the impression that quality management and certification efforts have made more progress in the inpatient facilities. Although 80% of the outpatient institutions claim to have a quality management system, only 32.1% of them admit to having already been (or be in current preparation to be) certified, a figure that was 41.5% among the inpatient facilities. These percentages are smaller when one relies on information provided by the certifying institutions themselves rather on the nursing facilities. Most frequent is the certification according to the DIN EN ISO 9001 standard, since the care-specific certification procedures most widespread on the market enable facilities to combine a care-specific certificate with one according to DIN norms. Quality management has become very widespread in nursing facilities: every third institution claims to have been certified, and the trend to become certified has clearly intensified over the last few years. We observe overall very great acceptance of both internal quality management and external quality assurance. We suspect that the current use of quality management instruments in many nursing facilities will not fall behind such efforts in hospitals and rehabilitation centres. © Georg Thieme Verlag KG Stuttgart · New York.

  5. The Future of Facilities Management.

    ERIC Educational Resources Information Center

    Daigneau, William A.

    1997-01-01

    Reports on a conference of college facility managers at which facilities professionals identified forces affecting the profession's future in five areas (information technology, resource scarcity, societal changes, government role in education, environmental deterioration) and six important roles for the manager (operational efficiency expert,…

  6. Health information system strengthening and malaria elimination in Papua New Guinea.

    PubMed

    Rosewell, Alexander; Makita, Leo; Muscatello, David; John, Lucy Ninmongo; Bieb, Sibauk; Hutton, Ross; Ramamurthy, Sundar; Shearman, Phil

    2017-07-05

    The objective of the study was to describe an m-health initiative to strengthen malaria surveillance in a 184-health facility, multi-province, project aimed at strengthening the National Health Information System (NHIS) in a country with fragmented malaria surveillance, striving towards enhanced control, pre-elimination. A remote-loading mobile application and secure online platform for health professionals was created to interface with the new system (eNHIS). A case-based malaria testing register was developed and integrated geo-coded households, villages and health facilities. A malaria programme management dashboard was created, with village-level malaria mapping tools, and statistical algorithms to identify malaria outbreaks. Since its inception in 2015, 160,750 malaria testing records, including village of residence, have been reported to the eNHIS. These case-based, geo-coded malaria data are 100% complete, with a median data entry delay of 9 days from the date of testing. The system maps malaria to the village level in near real-time as well as the availability of treatment and diagnostics to health facility level. Data aggregation, analysis, outbreak detection, and reporting are automated. The study demonstrates that using mobile technologies and GIS in the capture and reporting of NHIS data in Papua New Guinea provides timely, high quality, geo-coded, case-based malaria data required for malaria elimination. The health systems strengthening approach of integrating malaria information management into the eNHIS optimizes sustainability and provides enormous flexibility to cater for future malaria programme needs.

  7. The Euratom-Rosatom ERCOSAM-SAMARA projects on containment thermal-hydraulics of current and future LWRs for severe accident management

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Paladino, D.; Guentay, S.; Andreani, M.

    2012-07-01

    During a postulated severe accident with core degradation, hydrogen would form in the reactor pressure vessel mainly due to high temperatures zirconium-steam reaction and flow together with steam into the containment where it will mix with the containment atmosphere (steam-air). The hydrogen transport into the containment is a safety concern because it can lead to explosive mixtures through the associated phenomena of condensation, mixing and stratification. The ERCOSAM and SAMARA projects, co-financed by the European Union and the Russia, include various experiments addressing accident scenarios scaled down from existing plant calculations to different thermal-hydraulics facilities (TOSQAN, MISTRA, PANDA, SPOT). Themore » tests sequences aim to investigate hydrogen concentration build-up and stratification during a postulated accident and the effect of the activation of Severe Accident Management systems (SAMs), e.g. sprays, coolers and Passive Auto-catalytic Recombiners (PARs). Analytical activities, performed by the project participants, are an essential component of the projects, as they aim to improve and validate various computational methods. They accompany the projects in the various phases; plant calculations, scaling to generic containment and to the different facilities, planning pre-test and post-test simulations are performed. Code benchmark activities on the basis of conceptual near full scale HYMIX facility will finally provide a further opportunity to evaluate the applicability of the various methods to the study of scaling issues. (authors)« less

  8. Does identity shape leadership and management practice? Experiences of PHC facility managers in Cape Town, South Africa

    PubMed Central

    Daire, Judith; Gilson, Lucy

    2014-01-01

    In South Africa, as elsewhere, Primary Health Care (PHC) facilities are managed by professional nurses. Little is known about the dimensions and challenges of their job, or what influences their managerial practice. Drawing on leadership and organizational theory, this study explored what the job of being a PHC manager entails, and what factors influence their managerial practice. We specifically considered whether the appointment of professional nurses as facility managers leads to an identity transition, from nurse to manager. The overall intention was to generate ideas about how to support leadership development among PHC facility managers. Adopting case study methodology, the primary researcher facilitated in-depth discussions (about their personal history and managerial experiences) with eight participating facility managers from one geographical area. Other data were collected through in-depth interviews with key informants, document review and researcher field notes/journaling. Analysis involved data triangulation, respondent and peer review and cross-case analysis. The experiences show that the PHC facility manager’s job is dominated by a range of tasks and procedures focused on clinical service management, but is expected to encompass action to address the population and public health needs of the surrounding community. Managing with and through others, and in a complex system, requiring self-management, are critical aspects of the job. A range of personal, professional and contextual factors influence managerial practice, including professional identity. The current largely facility-focused management practice reflects the strong nursing identity of managers and broader organizational influences. However, three of the eight managers appear to self-identify an emerging leadership identity and demonstrate related managerial practices. Nonetheless, there is currently limited support for an identity transition towards leadership in this context. Better support for leadership development could include talent-spotting and nurturing, induction and peer-mentoring for newly appointed facility managers, ongoing peer-support once in post and continuous reflective practice. PMID:25274644

  9. Assessment of management policies and practices for occupational exposure to bloodborne pathogens in dialysis facilities.

    PubMed

    Mbaeyi, Chukwuma; Panlilio, Adelisa L; Hobbs, Cynthia; Patel, Priti R; Kuhar, David T

    2012-10-01

    Occupational exposure management is an important element in preventing the transmission of bloodborne pathogens in health care settings. In 2008, the US Centers for Disease Control and Prevention conducted a survey to assess procedures for managing occupational bloodborne pathogen exposures in outpatient dialysis facilities in the United States. A cross-sectional survey of randomly selected outpatient dialysis facilities. 339 outpatient dialysis facilities drawn from the 2006 US end-stage renal disease database. Hospital affiliation (free-standing vs hospital-based facilities), profit status (for-profit vs not-for-profit facilities), and number of health care personnel (≥100 vs <100 health care personnel). Exposures to hepatitis B virus (HBV), hepatitis C virus (HCV), and human immunodeficiency virus (HIV); provision of HBV and HIV postexposure prophylaxis. We calculated the proportion of facilities reporting occupational bloodborne pathogen exposures and offering occupational exposure management services. We analyzed bloodborne pathogen exposures and provision of postexposure prophylaxis by facility type. Nearly all respondents (99.7%) had written policies and 95% provided occupational exposure management services to health care personnel during the daytime on weekdays, but services were provided infrequently during other periods of the week. Approximately 10%-15% of facilities reported having HIV, HBV, or HCV exposures in health care personnel in the 12 months prior to the survey, but inconsistencies were noted in procedures for managing such exposures. Despite 86% of facilities providing HIV prophylaxis for exposed health care personnel, only 37% designated a primary HIV postexposure prophylaxis regimen. For-profit and free-standing facilities reported fewer exposures, but did not as reliably offer HBV prophylaxis or have a primary HIV postexposure prophylaxis regimen relative to not-for-profit and hospital-based facilities. The survey response rate was low (37%) and familiarity of individuals completing the survey with facility policies or national guidelines could not be ascertained. Significant improvements are required in the implementation of guidelines for managing occupational exposures to bloodborne pathogens in outpatient dialysis facilities. Published by Elsevier Inc.

  10. Downgrading Nuclear Facilities to Radiological Facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jarry, Jeffrey F.; Farr, Jesse Oscar; Duran, Leroy

    2015-08-01

    Based on inventory reductions and the use of alternate storage facilities, the Sandia National Laboratories (SNL) downgraded 4 SNL Hazard Category 3 (HC-3) nuclear facilities to less-than-HC-3 radiological facilities. SNL’s Waste Management and Pollution Prevention Department (WMPPD) managed the HC-3 nuclear facilities and implemented the downgrade. This paper will examine the downgrade process,

  11. Facilities maintenance handbook

    NASA Technical Reports Server (NTRS)

    1991-01-01

    This handbook is a guide for facilities maintenance managers. Its objective is to set minimum facilities maintenance standards. It also provides recommendations on how to meet the standards to ensure that NASA maintains its facilities in a manner that protects and preserves its investment in the facilities in a cost-effective manner while safely and efficiently performing its mission. This handbook implements NMI 8831.1, which states NASA facilities maintenance policy and assigns organizational responsibilities for the management of facilities maintenance activities on all properties under NASA jurisdiction. It is a reference for facilities maintenance managers, not a step-by-step procedural manual. Because of the differences in NASA Field Installation organizations, this handbook does not assume or recommend a typical facilities maintenance organization. Instead, it uses a systems approach to describe the functions that should be included in any facilities maintenance management system, regardless of its organizational structure. For documents referenced in the handbook, the most recent version of the documents is applicable. This handbook is divided into three parts: Part 1 specifies common definitions and facilities maintenance requirements and amplifies the policy requirements contained in NMI 8831. 1; Part 2 provides guidance on how to meet the requirements of Part 1, containing recommendations only; Part 3 contains general facilities maintenance information. One objective of this handbook is to fix commonality of facilities maintenance definitions among the Centers. This will permit the application of uniform measures of facilities conditions, of the relationship between current replacement value and maintenance resources required, and of the backlog of deferred facilities maintenance. The utilization of facilities maintenance system functions will allow the Centers to quantitatively define maintenance objectives in common terms, prepare work plans, and develop management information in order to statistically identify and analyze variances from those plans. It will also add credibility to the NASA facilities maintenance budgeting process. The key to a successful maintenance program is the understanding and support of the senior Center managers.

  12. Healthcare waste management: current practices in selected healthcare facilities, Botswana.

    PubMed

    Mbongwe, Bontle; Mmereki, Baagi T; Magashula, Andrew

    2008-01-01

    Healthcare waste management continues to present an array of challenges for developing countries, and Botswana is no exception. The possible impact of healthcare waste on public health and the environment has received a lot of attention such that Waste Management dedicated a special issue to the management of healthcare waste (Healthcare Wastes Management, 2005. Waste Management 25(6) 567-665). As the demand for more healthcare facilities increases, there is also an increase on waste generation from these facilities. This situation requires an organised system of healthcare waste management to curb public health risks as well as occupational hazards among healthcare workers as a result of poor waste management. This paper reviews current waste management practices at the healthcare facility level and proposes possible options for improvement in Botswana.

  13. Large-scale testing of in-vessel debris cooling through external flooding of the reactor pressure vessel in the CYBL facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chu, T.Y.; Bentz, J.H.; Bergeron, K.D.

    1994-04-01

    The possibility of achieving in-vessel core retention by flooding the reactor cavity, or the ``flooded cavity``, is an accident management concept currently under consideration for advanced light water reactors (ALWR), as well as for existing light water reactors (LWR). The CYBL (CYlindrical BoiLing) facility is a facility specifically designed to perform large-scale confirmatory testing of the flooded cavity concept. CYBL has a tank-within-a-tank design; the inner 3.7 m diameter tank simulates the reactor vessel, and the outer tank simulates the reactor cavity. The energy deposition on the bottom head is simulated with an array of radiant heaters. The array canmore » deliver a tailored heat flux distribution corresponding to that resulting from core melt convection. The present paper provides a detailed description of the capabilities of the facility, as well as results of recent experiments with heat flux in the range of interest to those required for in-vessel retention in typical ALWRs. The paper concludes with a discussion of other experiments for the flooded cavity applications.« less

  14. Insect pest management decisions in food processing facilities

    USDA-ARS?s Scientific Manuscript database

    Pest management decision making in food processing facilities such as flour mills, rice mills, human and pet food manufacturing facilities, distribution centers and warehouses, and retail stores is a challenging undertaking. Insect pest management programs require an understanding of the food facili...

  15. A distributed data base management facility for the CAD/CAM environment

    NASA Technical Reports Server (NTRS)

    Balza, R. M.; Beaudet, R. W.; Johnson, H. R.

    1984-01-01

    Current/PAD research in the area of distributed data base management considers facilities for supporting CAD/CAM data management in a heterogeneous network of computers encompassing multiple data base managers supporting a variety of data models. These facilities include coordinated execution of multiple DBMSs to provide for administration of and access to data distributed across them.

  16. 41 CFR 102-72.45 - What are the different types of delegations related to facility management?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... different types of delegations related to facility management? The principal types of delegations involved... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What are the different types of delegations related to facility management? 102-72.45 Section 102-72.45 Public Contracts and...

  17. Coordination and establishment of centralized facilities and services of the University of Alaska ERTS survey of the Alaskan environment

    NASA Technical Reports Server (NTRS)

    Belon, A. E. (Principal Investigator); Miller, J. M.

    1973-01-01

    The author has identified the following significant results. The objective of this project is to provide a focus for the entire University of Alaska ERTS-1 effort (12 projects covering 10 disciplines and involving 8 research institutes and science departments). Activities have been concentrated on the implementation of the project's three primary functions: (1) coordination and management of the U of A ERTS-1 program, including management of the flow of data and data products; (2) acquisition, installation, test, operation, and maintanence of centralized facilities for processing ERTS-1, aircraft, and ground truth data; and (3) development of photographic and digital techniques for processing and interpreting ERTS-1 and aircraft data. With minor exceptions these three functions are now well-established and working smoothly.

  18. KENNEDY SPACE CENTER, FLA. - On a tour of the KSC Beach Corrosion Test Site, Louis MacDowell (right), Testbed manager, explains to Center Director Jim Kennedy a project being undertaken for the U.S. Navy. At left are nonchrome primers for aircraft being studied. Behind Kennedy is Lead Scientist Dr. Luz Marina Calle. Behind MacDowell is Dr. Paul Hintze, who is working on a graduate project for the National Research Council. The KSC Beach Corrosion Test Site was established in the 1960s and has provided more than 30 years of historical information on the long-term performance of many materials in use at KSC and other locations around the world. Located 100 feet from the Atlantic Ocean approximately 1 mile south of the Space Shuttle launch sites, the test facility includes an atmospheric exposure site, a flowing seawater exposure site, and an on-site electrochemistry laboratory and monitoring station. The beach laboratory is used to conduct real-time corrosion experiments and provides for the remote monitoring of surrounding weather conditions. The newly added flowing seawater immersion facility provides for the immersion testing of materials and devices under controlled conditions.

    NASA Image and Video Library

    2003-08-21

    KENNEDY SPACE CENTER, FLA. - On a tour of the KSC Beach Corrosion Test Site, Louis MacDowell (right), Testbed manager, explains to Center Director Jim Kennedy a project being undertaken for the U.S. Navy. At left are nonchrome primers for aircraft being studied. Behind Kennedy is Lead Scientist Dr. Luz Marina Calle. Behind MacDowell is Dr. Paul Hintze, who is working on a graduate project for the National Research Council. The KSC Beach Corrosion Test Site was established in the 1960s and has provided more than 30 years of historical information on the long-term performance of many materials in use at KSC and other locations around the world. Located 100 feet from the Atlantic Ocean approximately 1 mile south of the Space Shuttle launch sites, the test facility includes an atmospheric exposure site, a flowing seawater exposure site, and an on-site electrochemistry laboratory and monitoring station. The beach laboratory is used to conduct real-time corrosion experiments and provides for the remote monitoring of surrounding weather conditions. The newly added flowing seawater immersion facility provides for the immersion testing of materials and devices under controlled conditions.

  19. KENNEDY SPACE CENTER, FLA. - On a tour of the KSC Beach Corrosion Test Site, Center Director Jim Kennedy (second from right) learns from Testbed Manager Louis MacDowell (right) about a project being undertaken for the U.S. Navy. Being studied are nonchrome primers for aircraft. At left are Lead Scientist Dr. Luz Marina Calle and Dr. Paul Hintze, who is working on a graduate project for the National Research Council. The KSC Beach Corrosion Test Site was established in the 1960s and has provided more than 30 years of historical information on the long-term performance of many materials in use at KSC and other locations around the world. Located 100 feet from the Atlantic Ocean approximately 1 mile south of the Space Shuttle launch sites, the test facility includes an atmospheric exposure site, a flowing seawater exposure site, and an on-site electrochemistry laboratory and monitoring station. The beach laboratory is used to conduct real-time corrosion experiments and provides for the remote monitoring of surrounding weather conditions. The newly added flowing seawater immersion facility provides for the immersion testing of materials and devices under controlled conditions.

    NASA Image and Video Library

    2003-08-21

    KENNEDY SPACE CENTER, FLA. - On a tour of the KSC Beach Corrosion Test Site, Center Director Jim Kennedy (second from right) learns from Testbed Manager Louis MacDowell (right) about a project being undertaken for the U.S. Navy. Being studied are nonchrome primers for aircraft. At left are Lead Scientist Dr. Luz Marina Calle and Dr. Paul Hintze, who is working on a graduate project for the National Research Council. The KSC Beach Corrosion Test Site was established in the 1960s and has provided more than 30 years of historical information on the long-term performance of many materials in use at KSC and other locations around the world. Located 100 feet from the Atlantic Ocean approximately 1 mile south of the Space Shuttle launch sites, the test facility includes an atmospheric exposure site, a flowing seawater exposure site, and an on-site electrochemistry laboratory and monitoring station. The beach laboratory is used to conduct real-time corrosion experiments and provides for the remote monitoring of surrounding weather conditions. The newly added flowing seawater immersion facility provides for the immersion testing of materials and devices under controlled conditions.

  20. KENNEDY SPACE CENTER, FLA. - On a tour of the KSC Beach Corrosion Test Site, Testbed Manager Louis MacDowell (foreground) explains to Center Director Jim Kennedy (third from right) about a study being undertaken for the U.S. Navy: nonchrome primers for aircraft. At left is Lead Scientist Dr. Luz Marina Calle and behind MacDowell is Dr. Paul Hintze, who is working on a graduate project for the National Research Council. The KSC Beach Corrosion Test Site was established in the 1960s and has provided more than 30 years of historical information on the long-term performance of many materials in use at KSC and other locations around the world. Located 100 feet from the Atlantic Ocean approximately 1 mile south of the Space Shuttle launch sites, the test facility includes an atmospheric exposure site, a flowing seawater exposure site, and an on-site electrochemistry laboratory and monitoring station. The beach laboratory is used to conduct real-time corrosion experiments and provides for the remote monitoring of surrounding weather conditions. The newly added flowing seawater immersion facility provides for the immersion testing of materials and devices under controlled conditions.

    NASA Image and Video Library

    2003-08-21

    KENNEDY SPACE CENTER, FLA. - On a tour of the KSC Beach Corrosion Test Site, Testbed Manager Louis MacDowell (foreground) explains to Center Director Jim Kennedy (third from right) about a study being undertaken for the U.S. Navy: nonchrome primers for aircraft. At left is Lead Scientist Dr. Luz Marina Calle and behind MacDowell is Dr. Paul Hintze, who is working on a graduate project for the National Research Council. The KSC Beach Corrosion Test Site was established in the 1960s and has provided more than 30 years of historical information on the long-term performance of many materials in use at KSC and other locations around the world. Located 100 feet from the Atlantic Ocean approximately 1 mile south of the Space Shuttle launch sites, the test facility includes an atmospheric exposure site, a flowing seawater exposure site, and an on-site electrochemistry laboratory and monitoring station. The beach laboratory is used to conduct real-time corrosion experiments and provides for the remote monitoring of surrounding weather conditions. The newly added flowing seawater immersion facility provides for the immersion testing of materials and devices under controlled conditions.

  1. Agreement Moves Nevada Solar Plant Step Closer to Reality

    Science.gov Websites

    Secretary Christine Ervin, CSTRR President Rose McKinney-James and NREL Director Dr. Charles Gay today new partnership, NREL will make available its facilities to test renewable energy technologies, help other renewable technologies. NREL will support the efforts of DOE's Federal Energy Management Program

  2. Final report on a cold climate permeable interlocking concrete pavement test facility at the University of New Hampshire Stormwater Center.

    DOT National Transportation Integrated Search

    2013-05-01

    University of New Hampshire Stormwater Center (UNHSC) completed a two year field verification study of a permeable interlocking concrete pavement (PICP) stormwater management system. The purpose of this study was to evaluate the cold climate function...

  3. 76 FR 4858 - Submission for OMB Review; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-27

    ... such as equine infectious anemia, as well as to take action to prevent and to manage exotic diseases... Infectious Anemia Laboratory Test; VS 10- 12, Equine Infectious Anemia Supplemental Investigation; and VS 1... infectious anemia. Regulations also require the use an Agreement for Approved Livestock Facilities, Request...

  4. Gender Issues and Equity in Athletic Management.

    ERIC Educational Resources Information Center

    Miles, Albert S.; Miller, Michael T.; Newman, Richard E.

    1999-01-01

    Although discrimination is no longer routinely accepted in education, incidents of gender-based discrimination and harassment are being reported in record numbers. Schools must ensure equality of female athletic facilities; be aware of oral-contract, tort, and sexual harassment pitfalls; and meet Title IX's three-pronged compliance test. Contains…

  5. Ames Research Center cryogenics program

    NASA Technical Reports Server (NTRS)

    Kittel, Peter

    1987-01-01

    Viewgraphs describe the Ames Research Center's cryogenics program. Diagrams are given of a fluid management system, a centrifugal pump, a flow meter, a liquid helium test facility, an extra-vehicular activity coupler concept, a dewar support with passive orbital disconnect, a pulse tube refrigerator, a dilution refrigerator, and an adiabatic demagnetization cooler.

  6. 76 FR 30184 - Outer Continental Shelf (OCS) Renewable Energy Program Interim Policy Leasing for Marine...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-24

    ... DEPARTMENT OF THE INTERIOR Bureau of Ocean Energy Management, Regulation and Enforcement [Docket..., Regulation and Enforcement (BOEMRE), Interior. ACTION: Notice of Intent (NOI) to Prepare an Environmental... technology testing facility located on the OCS, in accordance with the Department of the Interior and the...

  7. [Nuclear energy and environment: review of the IAEA environmental projects].

    PubMed

    Fesenko, S; Fogt, G

    2012-01-01

    The review of the environmental projects of the International Atomic Energy Agency is presented. Basic IAEA documents intended to protect humans and the Environment are considered and their main features are discussed. Some challenging issues in the area of protection of the Environment and man, including the impact of nuclear facilities on the environment, radioactive waste management, and remediation of the areas affected by radiological accidents, nuclear testing and sites of nuclear facilities are also discussed. The need to maintain the existing knowledge in radioecology and protection of the environment is emphasised.

  8. U.S. Department of Energy Nevada Operations Office Environmental Monitoring Program summary data report, second calendar quarter 1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Black, S.C.; Townsend, Y.E.

    1997-02-01

    The Nevada Test Site (NTS), located in southern Nevada, has been the primary location for testing of nuclear explosives in the continental US. Testing began in 1951 and continued until the moratorium in 1992. Waste storage and disposal facilities for defense radioactive and mixed waste are located in Areas 3 and 5. At the Area 5 Radioactive Waste Management Site (RWMS-5), low-level wastes (LLW) from US Department of Energy (DOE) affiliated onsite and offsite generators are disposed of using standard shallow land disposal techniques. Transuranic wastes are retrievably stored at the RWMS-5 in containers on a surface pad, pending shipmentmore » to the Waste Isolation Pilot Plant facility in New Mexico. Nonradioactive hazardous wastes are accumulated at a special site before shipment to a licensed offsite disposal facility. Non-standard packages of LLW are buried in subsidence craters in the Area 3 RWMS. This report describes these activities on and around the NTS and includes a listing of the results obtained from environmental surveillance activities during the second calendar quarter of 1996.« less

  9. Estimating the cost of referral and willingness to pay for referral to higher-level health facilities: a case series study from an integrated community case management programme in Uganda.

    PubMed

    Nanyonjo, Agnes; Bagorogoza, Benson; Kasteng, Frida; Ayebale, Godfrey; Makumbi, Fredrick; Tomson, Göran; Källander, Karin

    2015-08-28

    Integrated community case management (iCCM) relies on community health workers (CHWs) managing children with malaria, pneumonia, diarrhoea, and referring children when management is not possible. This study sought to establish the cost per sick child referred to seek care from a higher-level health facility by a CHW and to estimate caregivers' willingness to pay (WTP) for referral. Caregivers of 203 randomly selected children referred to higher-level health facilities by CHWs were interviewed in four Midwestern Uganda districts. Questionnaires and document reviews were used to capture direct, indirect and opportunity costs incurred by caregivers, CHWs and health facilities managing referred children. WTP for referral was assessed through the 'bidding game' approach followed by an open-ended question on maximum WTP. Descriptive analysis was conducted for factors associated with referral completion and WTP using logistic and linear regression methods, respectively. The cost per case referred to higher-level health facilities was computed from a societal perspective. Reasons for referral included having fever with a negative malaria test (46.8%), danger signs (29.6%) and drug shortage (37.4%). Among the referred, less than half completed referral (45.8%). Referral completion was 2.8 times higher among children with danger signs (p = 0.004) relative to those without danger signs, and 0.27 times lower among children who received pre-referral treatment (p < 0.001). The average cost per case referred was US$ 4.89 and US$7.35 per case completing referral. For each unit cost per case referred, caregiver out of pocket expenditure contributed 33.7%, caregivers' and CHWs' opportunity costs contributed 29.2% and 5.1% respectively and health facility costs contributed 39.6%. The mean (SD) out of pocket expenditure was US$1.65 (3.25). The mean WTP for referral was US$8.25 (14.70) and was positively associated with having received pre-referral treatment, completing referral and increasing caregiver education level. The mean WTP for referral was higher than the average out of pocket expenditure. This, along with suboptimal referral completion, points to barriers in access to higher-level facilities as the primary cause of low referral. Community mobilisation for uptake of referral is necessary if the policy of referring children to the nearest health facility is to be effective.

  10. 7 CFR 205.271 - Facility pest management practice standard.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 3 2010-01-01 2010-01-01 false Facility pest management practice standard. 205.271... MARKETING SERVICE (Standards, Inspections, Marketing Practices), DEPARTMENT OF AGRICULTURE (CONTINUED... Requirements § 205.271 Facility pest management practice standard. (a) The producer or handler of an organic...

  11. TU-G-BRCD-01: Will the High Cost of Proton Therapy Facilities Limit the Availability of Proton Therapy Treatment?

    PubMed

    Maughan, R

    2012-06-01

    The potential dose distribution advantages associated with proton therapy, and particularly with pencil beam scanning (PBS) techniques, have lead to considerable interest in this modality in recent years. However, the large capital expenditure necessary for such a project requires careful financial consideration and business planning. The complexity of the beam delivery systems impacts the capital expenditure and the PBS only systems presently being advocated can reduce these costs. Also several manufacturers are considering "one-room" facilities as less expensive alternatives to multi-room facilities. This presentation includes a brief introduction to beam delivery options (passive scattering, uniform and modulated scanning) and some of the new technologies proposed for providing less expensive proton therapy systems. Based on current experience, data on proton therapy center start-up costs, running costs and the financial challenges associated with making this highly conformal therapy more widely available will be discussed. Issues associated with proton therapy implementation that are key to project success include strong project management, vendor cooperation and collaboration, staff recruitment and training. Time management during facility start up is a major concern, particularly in multi-room systems, where time must be shared between continuing vendor system validation, verification and acceptance testing, and user commissioning and patient treatments. The challenges associated with facility operation during this period and beyond are discussed, focusing on how standardization of process, downtime and smart scheduling can influence operational efficiency. 1. To understand the available choices for proton therapy facilities, the different beam delivery systems and the financial implications associated with these choices. 2. To understand the key elements necessary for successfully implementing a proton therapy program. 3. To understand the challenges associated with on-going facility management to achieve an efficient fully operational system. © 2012 American Association of Physicists in Medicine.

  12. Advanced long term cryogenic storage systems

    NASA Technical Reports Server (NTRS)

    Brown, Norman S.

    1987-01-01

    Long term, cryogenic fluid storage facilities will be required to support future space programs such as the space-based Orbital Transfer Vehicle (OTV), Telescopes, and Laser Systems. An orbital liquid oxygen/liquid hydrogen storage system with an initial capacity of approximately 200,000 lb will be required. The storage facility tank design must have the capability of fluid acquisition in microgravity and limit cryogen boiloff due to environmental heating. Cryogenic boiloff management features, minimizing Earth-to-orbit transportation costs, will include advanced thick multilayer insulation/integrated vapor cooled shield concepts, low conductance support structures, and refrigeration/reliquefaction systems. Contracted study efforts are under way to develop storage system designs, technology plans, test article hardware designs, and develop plans for ground/flight testing.

  13. 41 CFR 102-74.225 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false [Reserved] 102-74.225 Section 102-74.225 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management...

  14. 41 CFR 102-74.220 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false [Reserved] 102-74.220 Section 102-74.220 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management...

  15. 41 CFR 102-74.215 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false [Reserved] 102-74.215 Section 102-74.215 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management...

  16. South African HIV self-testing policy and guidance considerations

    PubMed Central

    Jankelowitz, Lauren; Adams, Siraaj; Msimanga, Busisiwe R.; Nevhutalu, Zwoitwaho; Rhagnath, Naleni; Shroufi, Amir; Devillé, Walter; Kazangarare, Victoria; van der Wiel, Renee; Templeman, Hugo; Conradie, Francesca; Chidarikire, Thato; Gray, Andy

    2017-01-01

    The gap in HIV testing remains significant and new modalities such as HIV self-testing (HIVST) have been recommended to reach key and under-tested populations. In December 2016, the World Health Organization (WHO) released the Guidelines on HIV Self-Testing and Partner Notification: A Supplement to the Consolidated Guidelines on HIV Testing Services (HTS) and urged member countries to develop HIVST policy and regulatory frameworks. In South Africa, HIVST was included as a supplementary strategy in the National HIV Testing Services Policy in 2016, and recently, guidelines for HIVST were included in the South African National Strategic Plan for HIV, sexually transmitted infections and tuberculosis 2017–2022. This document serves as an additional guidance for the National HIV Testing Services Policy 2016, with specific focus on HIVST. It is intended for policy advocates, clinical and non-clinical HTS providers, health facility managers and healthcare providers in private and public health facilities, non-governmental, community-based and faith-based organisations involved in HTS and outreach, device manufacturers, workplace programmes and institutes of higher education. PMID:29568643

  17. [Antimicrobial resistance testing in clinical practice].

    PubMed

    Doi, Yohei

    2012-02-01

    Previously unrecognized or underrecognized antimicrobial resistant bacteria, including NDM-1-producing Enterobacteriaceae and multidrug-resistant Acinetobacter baumannii, were recently identified in health care facilities in Japan. Vigilance in the clinical microbiology laboratory for these organisms is the key to early recognition of their emergence. Many of these organisms can be confirmed or at least suspected through routine susceptibility testing, which can then be referred to reference laboratories for further phenotypic or genetic testing. Antimicrobial resistance testing plays a crucial role in patient management, infection control and monitoring of local as well as national and international epidemiology.

  18. Corrective Action Decision Document/Closure Report for Corrective Action Unit 570: Area 9 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    2013-11-01

    This Corrective Action Decision Document/Closure Report presents information supporting the closure of Corrective Action Unit (CAU) 570: Area 9 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada. This complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. The purpose of the CADD/CR is to provide justification and documentation supporting the recommendation that no further corrective action is needed.

  19. Evaluation of power control concepts using the PMAD systems test bed. [Power Management and Distribution

    NASA Technical Reports Server (NTRS)

    Beach, R. F.; Kimnach, G. L.; Jett, T. A.; Trash, L. M.

    1989-01-01

    The Lewis Research Center's Power Management and Distribution (PMAD) System testbed and its use in the evaluation of control concepts applicable to the NASA Space Station Freedom electric power system (EPS) are described. The facility was constructed to allow testing of control hardware and software in an environment functionally similar to the space station electric power system. Control hardware and software have been developed to allow operation of the testbed power system in a manner similar to a supervisory control and data acquisition (SCADA) system employed by utility power systems for control. The system hardware and software are described.

  20. Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-96) - Snohomish District Substations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hermeston, Mark W.

    2002-07-19

    Proposed Action: Vegetation Management for facilities located in the Snohomish District. BPA proposes total vegetation management (bareground) in the electrical substations, and, noxious weed management and maintenance of landscaping within the property boundaries of the listed facilities. These facilities are all located within the Snohomish District of the Snohomish Region.

  1. Cross-sectional survey of treatment practices for urethritis at pharmacies, private clinics and government health facilities in coastal Kenya: many missed opportunities for HIV prevention.

    PubMed

    Mugo, Peter M; Duncan, Sarah; Mwaniki, Samuel W; Thiong'o, Alexander N; Gichuru, Evanson; Okuku, Haile Selassie; van der Elst, Elise M; Smith, Adrian D; Graham, Susan M; Sanders, Eduard J

    2013-11-01

    While bacterial sexually transmitted infections (STIs) are important cofactors for HIV transmission, STI control has received little attention in recent years. The aim of this study was to assess STI treatment and HIV testing referral practices among health providers in Kenya. In 2011 we assessed quality of case management for male urethritis at pharmacies, private clinics and government health facilities in coastal Kenya using simulated visits at pharmacies and interviews at pharmacies and health facilities. Quality was assessed using Ministry of Health guidelines. Twenty (77%) of 26 pharmacies, 20 (91%) of 22 private clinics and all four government facilities in the study area took part. The median (IQR) number of adult urethritis cases per week was 5 (2-10) at pharmacies, 3 (1-3) at private clinics and 5 (2-17) at government facilities. During simulated visits, 10% of pharmacies prescribed recommended antibiotics at recommended dosages and durations and, during interviews, 28% of pharmacies and 27% of health facilities prescribed recommended antibiotics at recommended dosages and durations. Most regimens were quinolone-based. HIV testing was recommended during 10% of simulated visits, 20% of pharmacy interviews and 25% of health facility interviews. In an area of high STI burden, most men with urethritis seek care at pharmacies and private clinics. Most providers do not comply with national guidelines and very few recommend HIV testing. In order to reduce the STI burden and mitigate HIV transmission, there is an urgent need for innovative dissemination of up-to-date guidelines and inclusion of all health providers in HIV/STI programmes.

  2. 77 FR 64953 - Notice of Initiation and Preliminary Results of Antidumping Duty Changed Circumstances Review...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-24

    ... company's management, production facilities and customer/supplier relationships have not changed as a... in no significant changes to management, production facilities, supplier relationships, and customers... limited to, changes in: (1) Management; (2) production facilities; (3) supplier relationships; and (4...

  3. 15 CFR 923.52 - Consideration of the national interest in facilities.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AND COASTAL RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Coordination, Public..., and managing the coastal zone, including the siting of facilities such as energy facilities which are... to or affect a state's coastal zone. (4) Describe the process for continued consideration of the...

  4. 15 CFR 923.52 - Consideration of the national interest in facilities.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AND COASTAL RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Coordination, Public..., and managing the coastal zone, including the siting of facilities such as energy facilities which are... to or affect a state's coastal zone. (4) Describe the process for continued consideration of the...

  5. Facilities Management: A Program for the 1980s.

    ERIC Educational Resources Information Center

    Kaiser, Harvey H.

    1980-01-01

    Successful facilities management is described as based on a 10-point comprehensive program including: (1) physical planning policy; (2) facilities analysis; (3) management audit; (4) space utilization; (5) capital programs; (6) deferred maintenance; (7) controlled maintenance; (8) energy conservation; (9) environmental quality, health, and safety;…

  6. Professional Development through Organizational Assessment: Using APPA's Facilities Management Evaluation Program

    ERIC Educational Resources Information Center

    Medlin, E. Lander; Judd, R. Holly

    2013-01-01

    APPA's Facilities Management Evaluation Program (FMEP) provides an integrated system to optimize organizational performance. The criteria for evaluation not only provide a tool for organizational continuous improvement, they serve as a compelling leadership development tool essential for today's facilities management professional. The senior…

  7. Integration and Test of Shuttle Small Payloads

    NASA Technical Reports Server (NTRS)

    Wright, Michael R.

    2003-01-01

    Recommended approaches for space shuttle small payload integration and test (I&T) are presented. The paper is intended for consideration by developers of shuttle small payloads, including I&T managers, project managers, and system engineers. Examples and lessons learned are presented based on the extensive history of NASA's Hitchhiker project. All aspects of I&T are presented, including: (1) I&T team responsibilities, coordination, and communication; (2) Flight hardware handling practices; (3) Documentation and configuration management; (4) I&T considerations for payload development; (5) I&T at the development facility; (6) Prelaunch operations, transfer, orbiter integration and interface testing; (7) Postflight operations. This paper is of special interest to those payload projects that have small budgets and few resources: that is, the truly faster, cheaper, better projects. All shuttle small payload developers are strongly encouraged to apply these guidelines during I&T planning and ground operations to take full advantage of today's limited resources and to help ensure mission success.

  8. Research and test facilities for development of technologies and experiments with commercial applications

    NASA Technical Reports Server (NTRS)

    1989-01-01

    One of NASA'S agency-wide goals is the commercial development of space. To further this goal NASA is implementing a policy whereby U.S. firms are encouraged to utilize NASA facilities to develop and test concepts having commercial potential. Goddard, in keeping with this policy, will make the facilities and capabilities described in this document available to private entities at a reduced cost and on a noninterference basis with internal NASA programs. Some of these facilities include: (1) the Vibration Test Facility; (2) the Battery Test Facility; (3) the Large Area Pulsed Solar Simulator Facility; (4) the High Voltage Testing Facility; (5) the Magnetic Field Component Test Facility; (6) the Spacecraft Magnetic Test Facility; (7) the High Capacity Centrifuge Facility; (8) the Acoustic Test Facility; (9) the Electromagnetic Interference Test Facility; (10) the Space Simulation Test Facility; (11) the Static/Dynamic Balance Facility; (12) the High Speed Centrifuge Facility; (13) the Optical Thin Film Deposition Facility; (14) the Gold Plating Facility; (15) the Paint Formulation and Application Laboratory; (16) the Propulsion Research Laboratory; (17) the Wallops Range Facility; (18) the Optical Instrument Assembly and Test Facility; (19) the Massively Parallel Processor Facility; (20) the X-Ray Diffraction and Scanning Auger Microscopy/Spectroscopy Laboratory; (21) the Parts Analysis Laboratory; (22) the Radiation Test Facility; (23) the Ainsworth Vacuum Balance Facility; (24) the Metallography Laboratory; (25) the Scanning Electron Microscope Laboratory; (26) the Organic Analysis Laboratory; (27) the Outgassing Test Facility; and (28) the Fatigue, Fracture Mechanics and Mechanical Testing Laboratory.

  9. 41 CFR 102-74.90 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false [Reserved] 102-74.90 Section 102-74.90 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Concession...

  10. 41 CFR 102-74.85 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false [Reserved] 102-74.85 Section 102-74.85 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Concession...

  11. 41 CFR 102-74.95 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false [Reserved] 102-74.95 Section 102-74.95 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Concession...

  12. 41 CFR 102-74.80 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false [Reserved] 102-74.80 Section 102-74.80 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Concession...

  13. Does identity shape leadership and management practice? Experiences of PHC facility managers in Cape Town, South Africa.

    PubMed

    Daire, Judith; Gilson, Lucy

    2014-09-01

    In South Africa, as elsewhere, Primary Health Care (PHC) facilities are managed by professional nurses. Little is known about the dimensions and challenges of their job, or what influences their managerial practice. Drawing on leadership and organizational theory, this study explored what the job of being a PHC manager entails, and what factors influence their managerial practice. We specifically considered whether the appointment of professional nurses as facility managers leads to an identity transition, from nurse to manager. The overall intention was to generate ideas about how to support leadership development among PHC facility managers. Adopting case study methodology, the primary researcher facilitated in-depth discussions (about their personal history and managerial experiences) with eight participating facility managers from one geographical area. Other data were collected through in-depth interviews with key informants, document review and researcher field notes/journaling. Analysis involved data triangulation, respondent and peer review and cross-case analysis. The experiences show that the PHC facility manager's job is dominated by a range of tasks and procedures focused on clinical service management, but is expected to encompass action to address the population and public health needs of the surrounding community. Managing with and through others, and in a complex system, requiring self-management, are critical aspects of the job. A range of personal, professional and contextual factors influence managerial practice, including professional identity. The current largely facility-focused management practice reflects the strong nursing identity of managers and broader organizational influences. However, three of the eight managers appear to self-identify an emerging leadership identity and demonstrate related managerial practices. Nonetheless, there is currently limited support for an identity transition towards leadership in this context. Better support for leadership development could include talent-spotting and nurturing, induction and peer-mentoring for newly appointed facility managers, ongoing peer-support once in post and continuous reflective practice. Published by Oxford University Press in association with The London School of Hygiene and Tropical Medicine © The Author 2014; all rights reserved.

  14. Morpheus Alhat Tether Test Preparations

    NASA Image and Video Library

    2014-03-27

    CAPE CANAVERAL, Fla. – Technicians watch as a crane lowers the Project Morpheus prototype lander onto a launch pad at a new launch site at the north end of the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida. Preparations are underway for a tether test. The launch pad was moved to a different location at the landing facility to support the next phase of flight testing. Project Morpheus tests NASA’s automated landing and hazard avoidance technology, or ALHAT, and an engine that runs on liquid oxygen and methane, or green propellants, into a fully-operational lander that could deliver cargo to other planetary surfaces. The landing facility provides the lander with the kind of field necessary for realistic testing, complete with rocks, craters and hazards to avoid. Morpheus’ ALHAT payload allows it to navigate to clear landing sites amidst rocks, craters and other hazards during its descent. Project Morpheus is being managed under the Advanced Exploration Systems, or AES, Division in NASA’s Human Exploration and Operations Mission Directorate. The efforts in AES pioneer new approaches for rapidly developing prototype systems, demonstrating key capabilities and validating operational concepts for future human missions beyond Earth orbit. For more information on Project Morpheus, visit http://morpheuslander.jsc.nasa.gov/. Photo credit: NASA/Ben Smegelsky

  15. Morpheus Alhat Tether Test Preparations

    NASA Image and Video Library

    2014-03-27

    CAPE CANAVERAL, Fla. – A crane lowers the Project Morpheus prototype lander onto a launch pad at a new launch site at the north end of the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida. Preparations are underway for a tether test. The launch pad was moved to a different location at the landing facility to support the next phase of flight testing. Project Morpheus tests NASA’s automated landing and hazard avoidance technology, or ALHAT, and an engine that runs on liquid oxygen and methane, or green propellants, into a fully-operational lander that could deliver cargo to other planetary surfaces. The landing facility provides the lander with the kind of field necessary for realistic testing, complete with rocks, craters and hazards to avoid. Morpheus’ ALHAT payload allows it to navigate to clear landing sites amidst rocks, craters and other hazards during its descent. Project Morpheus is being managed under the Advanced Exploration Systems, or AES, Division in NASA’s Human Exploration and Operations Mission Directorate. The efforts in AES pioneer new approaches for rapidly developing prototype systems, demonstrating key capabilities and validating operational concepts for future human missions beyond Earth orbit. For more information on Project Morpheus, visit http://morpheuslander.jsc.nasa.gov/. Photo credit: NASA/Ben Smegelsky

  16. Morpheus Alhat Tether Test Preparations

    NASA Image and Video Library

    2014-03-27

    CAPE CANAVERAL, Fla. – Engineers and technicians monitor the progress as a crane lifts the Project Morpheus prototype lander off the ground for a tether test near a new launch site at the north end of the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida. The launch pad was moved to a different location at the landing facility to support the next phase of flight testing. Project Morpheus tests NASA’s automated landing and hazard avoidance technology, or ALHAT, and an engine that runs on liquid oxygen and methane, or green propellants, into a fully-operational lander that could deliver cargo to other planetary surfaces. The landing facility provides the lander with the kind of field necessary for realistic testing, complete with rocks, craters and hazards to avoid. Morpheus’ ALHAT payload allows it to navigate to clear landing sites amidst rocks, craters and other hazards during its descent. Project Morpheus is being managed under the Advanced Exploration Systems, or AES, Division in NASA’s Human Exploration and Operations Mission Directorate. The efforts in AES pioneer new approaches for rapidly developing prototype systems, demonstrating key capabilities and validating operational concepts for future human missions beyond Earth orbit. For more information on Project Morpheus, visit http://morpheuslander.jsc.nasa.gov/. Photo credit: NASA/Ben Smegelsky

  17. Morpheus Alhat Tether Test Preparations

    NASA Image and Video Library

    2014-03-27

    CAPE CANAVERAL, Fla. – NASA's Project Morpheus prototype lander is positioned near a new launch site at the north end of the Shuttle Landing Facility at NASA’s Kennedy Space Center in Florida for a tether test. The launch pad was moved to a different location at the landing facility to support the next phase of flight testing. Project Morpheus tests NASA’s automated landing and hazard avoidance technology, or ALHAT, and an engine that runs on liquid oxygen and methane, or green propellants, into a fully-operational lander that could deliver cargo to other planetary surfaces. In the foreground of the photo is the ALHAT field. The landing facility provides the lander with the kind of field necessary for realistic testing, complete with rocks, craters and hazards to avoid. Morpheus’ ALHAT payload allows it to navigate to clear landing sites amidst rocks, craters and other hazards during its descent. Project Morpheus is being managed under the Advanced Exploration Systems, or AES, Division in NASA’s Human Exploration and Operations Mission Directorate. The efforts in AES pioneer new approaches for rapidly developing prototype systems, demonstrating key capabilities and validating operational concepts for future human missions beyond Earth orbit. For more information on Project Morpheus, visit http://morpheuslander.jsc.nasa.gov/. Photo credit: NASA/Ben Smegelsky

  18. 25th Space Simulation Conference. Environmental Testing: The Earth-Space Connection

    NASA Technical Reports Server (NTRS)

    Packard, Edward

    2008-01-01

    Topics covered include: Methods of Helium Injection and Removal for Heat Transfer Augmentation; The ESA Large Space Simulator Mechanical Ground Support Equipment for Spacecraft Testing; Temperature Stability and Control Requirements for Thermal Vacuum/Thermal Balance Testing of the Aquarius Radiometer; The Liquid Nitrogen System for Chamber A: A Change from Original Forced Flow Design to a Natural Flow (Thermo Siphon) System; Return to Mercury: A Comparison of Solar Simulation and Flight Data for the MESSENGER Spacecraft; Floating Pressure Conversion and Equipment Upgrades of Two 3.5kw, 20k, Helium Refrigerators; Affect of Air Leakage into a Thermal-Vacuum Chamber on Helium Refrigeration Heat Load; Special ISO Class 6 Cleanroom for the Lunar Reconnaissance Orbiter (LRO) Project; A State-of-the-Art Contamination Effects Research and Test Facility Martian Dust Simulator; Cleanroom Design Practices and Their Influence on Particle Counts; Extra Terrestrial Environmental Chamber Design; Contamination Sources Effects Analysis (CSEA) - A Tool to Balance Cost/Schedule While Managing Facility Availability; SES and Acoustics at GSFC; HST Super Lightweight Interchangeable Carrier (SLIC) Static Test; Virtual Shaker Testing: Simulation Technology Improves Vibration Test Performance; Estimating Shock Spectra: Extensions beyond GEVS; Structural Dynamic Analysis of a Spacecraft Multi-DOF Shaker Table; Direct Field Acoustic Testing; Manufacture of Cryoshroud Surfaces for Space Simulation Chambers; The New LOTIS Test Facility; Thermal Vacuum Control Systems Options for Test Facilities; Extremely High Vacuum Chamber for Low Outgassing Processing at NASA Goddard; Precision Cleaning - Path to Premier; The New Anechoic Shielded Chambers Designed for Space and Commercial Applications at LIT; Extraction of Thermal Performance Values from Samples in the Lunar Dust Adhesion Bell Jar; Thermal (Silicon Diode) Data Acquisition System; Aquarius's Instrument Science Data System (ISDS) Automated to Acquire, Process, Trend Data and Produce Radiometric System Assessment Reports; Exhaustive Thresholds and Resistance Checkpoints; Reconfigurable HIL Testing of Earth Satellites; FPGA Control System for the Automated Test of MicroShutters; Ongoing Capabilities and Developments of Re-Entry Plasma Ground Tests at EADS-ASTRIUM; Operationally Responsive Space Standard Bus Battery Thermal Balance Testing and Heat Dissipation Analysis; Galileo - The Serial-Production AIT Challenge; The Space Systems Environmental Test Facility Database (SSETFD), Website Development Status; Simulated Reentry Heating by Torching; Micro-Vibration Measurements on Thermally Loaded Multi-Layer Insulation Samples in Vacuum; High Temperature Life Testing of 80Ni-20Cr Wire in a Simulated Mars Atmosphere for the Sample Analysis at Mars (SAM) Instrument Suit Gas Processing System (GPS) Carbon Dioxide Scrubber; The Planning and Implementation of Test Facility Improvements; and Development of a Silicon Carbide Molecular Beam Nozzle for Simulation Planetary Flybys and Low-Earth Orbit.

  19. Savannah River Plant engineering and design history. Volume 4: 300/700 Areas & general services and facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1957-01-01

    The primary function of the 300 Area is the production and preparation of the fuel and target elements required for the 100 Area production reactors. Uranium slugs and lithium-aluminium alloy control and blanket rods are prepared in separate structures. Other facilities include a test pile, a physics assembly laboratory, an office and change house, an electrical substation, and various service facilities such as rail lines, roads, sewers, steam and water distribution lines, etc. The 700 Area contains housing and facilities for plant management, general plant services, and certain technical activities. The technical buildings include the Main Technical Laboratory, the Wastemore » Concentration Building, the Health Physics Headquarters, and the Health Physics Calibration building. Sections of this report describe the following: development of the 300-M Area; selection and description of process; design of main facilities of the 300 Area; development of the 700-A Area; design of the main facilities of the 700 Area; and general services and facilities, including transportation, plant protection, waste disposal and drainage, site work, pilot plants, storage, and furniture and fixtures.« less

  20. Assessment of health service delivery capacities, health providers' knowledge and practices related to type 2 diabetes care in Kinshasa primary healthcare network facilities, Democratic Republic of the Congo.

    PubMed

    Kapongo, Remy Y; Lulebo, Aimée M; Mafuta, Eric M; Mutombo, Paulin B; Dimbelolo, Jean Claude M; Bieleli, Isidore E

    2015-01-22

    Democratic Republic of the Congo (DRC) is experiencing an increase in the morbi-mortality related to Non Communicable Diseases (NCD). The reform of DRC health system, based on Health District model, is needed in order to tackle this public issue. This article used 2006 International Diabetes Federation (IDF)'s guidelines to assess the capacities of health facilities belonging to Kinshasa Primary Health Care Network (KPHCN) in terms of equipments, as well as the knowledge, and the practice of their health providers related to type 2 diabetes care. A multicentric cross-sectional study was carried in 18 Health Facilities (HF) of KPHCN in charge of the follow-up of diabetic patients. The presence of IDF recommended materials and equipment was checked and 28 health providers were interviewed about their theoretical knowledge about patients' management and therapeutic objectives during recommended visits. Chi square test or Fisher exact test was used to compare proportions and the Student t-test to compare means. The integration of NCD healthcare in the KPHC network is feasible. The majority of HF possessed IDF recommended materials except for the clinical practice guidelines, urinary test strips, and monofilament, available in only one, two and four HF, respectively. KPHCN referral facilities had required materials for biochemical analyses, the ECG and for the fundus oculi test. Patients' management is characterized by a lack of attention on the impairment of renal function during the first visits and a poor respect of recommended practices during quarterly and annual visits. A poor knowledge of the reduction of cardiovascular risk factors-related therapeutic objectives has been also reported. The capacities, knowledge, and practice of T2D care were poor among HF of KPHCN. The lack of equipment and training of healthcare professionals should be supplied even to those who are not medical doctors. Special attention must to be put on the clinical practice guidelines formulation and sensitization and on supervision.

  1. Comparison of DOE and NIRMA approaches to configuration management programs

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Yang, E.Y.; Kulzick, K.C.

    One of the major management programs used for commercial, laboratory, and defense nuclear facilities is configuration management. The safe and efficient operation of a nuclear facility requires constant vigilance in maintaining the facility`s design basis with its as-built condition. Numerous events have occurred that can be attributed to (either directly or indirectly) the extent to which configuration management principles have been applied. The nuclear industry, as a whole, has been addressing this management philosophy with efforts taken on by its constituent professional organizations. The purpose of this paper is to compare and contrast the implementation plans for enhancing a configurationmore » management program as outlined in the U.S. Department of Energy`s (DOE`s) DOE-STD-1073-93, {open_quotes}Guide for Operational Configuration Management Program,{close_quotes} with the following guidelines developed by the Nuclear Information and Records Management Association (NIRMA): 1. PP02-1994, {open_quotes}Position Paper on Configuration Management{close_quotes} 2. PP03-1992, {open_quotes}Position Paper for Implementing a Configuration Management Enhancement Program for a Nuclear Facility{close_quotes} 3. PP04-1994 {open_quotes}Position Paper for Configuration Management Information Systems.{close_quotes}« less

  2. Alternative Fuels Data Center: Workplace Charging at Leased Facilities

    Science.gov Websites

    Charges Up Tenants and Property Managers Workplace Charging at Leased Facilities Charges Up Tenants and Property Managers to someone by E-mail Share Alternative Fuels Data Center: Workplace Charging at Leased Facilities Charges Up Tenants and Property Managers on Facebook Tweet about Alternative

  3. 76 FR 179 - GMPT Warren Transmission, GM Powertrain Division, a Subsidiary of General Motors Company...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-03

    ... Knight Facilities Management, Warren, MI; Amended Certification Regarding Eligibility To Apply for Worker... Knight Facilities Management were employed on-site at the Warren, Michigan location of the subject firm... Knight Facilities Management working on-site at the Warren, Michigan location of GMPT Warren Transmission...

  4. Does PDC Belong in Facilities Management?

    ERIC Educational Resources Information Center

    Dessoff, Alan

    2012-01-01

    Whether planning, design, and construction (PDC) of buildings should be part of facilities management, with its traditional operations and maintenance functions, or separated from it, has been a divisive question on many campuses for a long time. Now, although it is not happening everywhere, facilities managers at a number of institutions, public…

  5. A Qualitative Study Investigating Facility Managers' Perceptions of the Classroom Learning Environment

    ERIC Educational Resources Information Center

    Parr, Eric Shannon

    2017-01-01

    Facility managers have the challenge of adhering to community college policies and procedures while fulfilling requirements of administration, students, and teachers concerning specific needs of classroom aesthetics. The role of facility manager and how specific entities affect perceptions of the design and implementation of classroom aesthetics…

  6. Management self assessment plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Debban, B.L.

    Duke Engineering and Services Hanford Inc., Spent Nuclear Fuel Project is responsible for the operation of fuel storage facilities. The SNF project mission includes the safe removal, processing and transportation of Spent Nuclear Fuel from 100 K Area fuel storage basins to a new Storage facility in the Hanford 200 East Area. Its mission is the modification of the 100 K area fuel storage facilities and the construction of two new facilities: the 100 K Area Cold Vacuum Drying Facility, and the 200 East Area Canister Storage Building. The management self assessment plan described in this document is scheduled tomore » begin in April of 1999 and be complete in May of 1999. The management self assessment plan describes line management preparations for declaring that line management is ready to commence operations.« less

  7. Innovation characteristics and intention to adopt sustainable facilities management practices.

    PubMed

    Lee, So Young; Kang, Mihyun

    2013-01-01

    Sustainable facilities management (SFM) is important because typical buildings consume more resources and energy than necessary, negatively impact the environment and generate lots of waste (US Department of Energy, 2003, Green Buildings). This study examined innovation characteristics that relate to facility managers' intention to adopt SFM practices. Based on the diffusion of innovations theory (Rogers 1962, 1995, Diffusion of Innovations. 4th ed. New York: The Free Press), an SFM innovation and adoption model was proposed. A survey was conducted with a convenience sample of 240 public facilities managers in 25 facilities management divisions in Seoul, Korea, and its metropolitan areas. Structural equation modelling was employed to analyse the data. The results showed that economic advantage and human comfort aspects are predictors for the intention of SFM adoption. Observability is positively relevant to the intention of SFM adoption. Complexity, however, is not a significant predictor for the intention of SFM adoption. Practical implications for sustainable products and systems and the built environment are suggested. To incorporate an innovation like sustainable practices, it is required to meet the needs of potential adopters. Innovation characteristics that influence facility managers' intention to adopt sustainable facilities management were examined. A survey was conducted. Economic advantage, human comfort and observability are predictors for the intention of adoption of sustainable practice.

  8. PACS: acceptance test, quality control, warranty, and maintenance continuum

    NASA Astrophysics Data System (ADS)

    Romlein, John R.; Norton, Gary S.; Lyche, David K.; Richardson, Ronald R., Jr.

    1999-07-01

    As PACS gain greater acceptance and use in medical facilities the question of life cycle management must be addressed in terms that relate to the common business practices for medical information system and medical devices. The issues in life cycle management of such a system are relatively new to the industry. Increased use of PACS within the medical community requires that standardized life cycle management practices by developed and implemented. This paper develops a new of life cycle issues as cyclic and related events that are not only manageable, but also predictable in terms, of, frequency, duration data content, data exchange, potential outcomes, staffing requirement, documentation, and staff interaction. This view is presented as a continuum that begins at the acceptance testing of a PACS and continues throughout its life cycle. The continuum incorporates the required relationship between quality control testing and maintenance actions during warranty period and the maintenance years. Interrelated cyclic events are described that bind these processes together and provide a basis for long-term proactive management of PACS in a medical environment.

  9. Systematic Planning for Educational Facilities.

    ERIC Educational Resources Information Center

    McGuffey, Carroll W.

    This monograph provides a systematic approach to the problem of planning educational facilities. It first presents a conceptual framework for a general facilities planning and management system called Facilities Resource Allocation Management Evaluation System (FRAMES). The main components of FRAMES are identified as: (1) needs assessment, (2)…

  10. 41 CFR 102-80.60 - Are Federal agencies responsible for performing facility assessments?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 80-SAFETY AND ENVIRONMENTAL MANAGEMENT Safety and Environmental Management Facility Assessments... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Are Federal agencies...

  11. Defense Energy Support Center Fact Book, Fiscal Year 1999, Twenty-Second Edition

    DTIC Science & Technology

    1999-01-01

    numbers SOURCE: FACILITIES AND DISTRIBUTION MANAGEMENT COMMODITY BUSINESS UNIT 11 OCONUS COCO 10 8,717,850...GOCO 7 1,518,905 SOURCE: FACILITIES AND DISTRIBUTION MANAGEMENT COMMODITY BUSINESS UNIT DLA MANAGED STORAGE...FY 95 FY 96 FY 97 FY 98 FY 99 SOURCE: FACILITIES AND DISTRIBUTION MANAGEMENT COMMODITY BUSINESS UNIT 13 0 20 40 60 80 100 120 140 160 180 200 220

  12. Reliability Growth Testing Effectiveness.

    DTIC Science & Technology

    1984-01-01

    interface boundaries. f. Test facility and equipment descriptions and requirements. g. Procedures and timing for corrective acticns. Uh . Blocks of tme and...apporLionment, FMEA and stress analysis. Instead, reiiability "growth management provides a means of viewing all the reliability program activities in an...A VENDOR SURVEILLANCE 8 A A R GROWTH ESTING. A R PROGRAM4 C B A A NORMALIZED INCREASE 0 2.5% 25% 60 % IN ACQUISITION COST RELATIVE CHANGE IN 1:1 4:1

  13. A Study on Governance and Human Resources for Cooperative Road Facilities Management

    NASA Astrophysics Data System (ADS)

    Ohno, Sachiko; Takagi, Akiyoshi; Kurauchi, Fumitaka; Demura, Yoshifumi

    Within today's infrastructure management, Asset Management systems are becoming a mainstream feature. For region where the risk is low, it is necessary to create a "cooperative road facilities management system". This research both examined and suggested what kind of cooperative road facilities management system should be promoted by the regional society. Concretely, this study defines the operational realities of a previous case. It discusses the problem of the road facilities management as a governance. Furthermore, its realization depends on "the cooperation between municipalities", "the private-sector initiative", and "residents participation" .Also, it discusses the problem of human resources for governance. Its realization depends on "the engineers' promotion", and "creation of a voluntary activity of the resident" as a human resources. Moreover, it defines that the intermediary is important because the human resources tied to the governance. As a result, the prospect of the road facilities management is shown by the role of the player and the relation among player.

  14. Unravelling the quality of HIV counselling and testing services in the private and public sectors in Zambia

    PubMed Central

    Ron Levey, Ilana; Wang, Wenjuan

    2014-01-01

    Background Despite the substantial investment for providing HIV counselling and testing (VCT) services in Zambia, there has been little effort to systematically evaluate the quality of VCT services provided by various types of health providers. This study, conducted in 2009, examines VCT in the public and private sectors including private for-profit and NGO/faith-based sectors in Copperbelt and Luapula. Methods The study used five primary data collection methods to gauge quality of VCT services: closed-ended client interviews with clients exiting VCT sites; open-ended client interviews; interviews with facility managers; review of service statistics; and an observation of the physical environment for VCT by site. Over 400 clients and 87 facility managers were interviewed from almost 90 facilities. Sites were randomly selected and results are generalizable at the provincial level. Results The study shows concerning levels of underperformance in VCT services across the sectors. It reveals serious underperformance in counselling about key risk-reduction methods. Less than one-third of clients received counselling on reducing number of sexual partners and only approximately 5% of clients received counselling about disclosing test results to partners. In terms of client profiles, the NGO sector attracts the most educated clients and less educated Zambians seek VCT services at very low rates (7%). The private for-profit performs equally or sometimes better than other sectors even though this sector is not adequately integrated into the Zambian national response to HIV. Conclusion The private for-profit sector provides VCT services on par in quality with the other sectors. Most clients did not receive counselling on partner reduction or disclosure of HIV test results to partners. In a generalized HIV epidemic where multiple concurrent sexual partners are a significant problem for transmitting the disease, risk-reduction methods and discussion should be a main focus of pre-test and post-test counselling. PMID:25012796

  15. Unravelling the quality of HIV counselling and testing services in the private and public sectors in Zambia.

    PubMed

    Ron Levey, Ilana; Wang, Wenjuan

    2014-07-01

    Despite the substantial investment for providing HIV counselling and testing (VCT) services in Zambia, there has been little effort to systematically evaluate the quality of VCT services provided by various types of health providers. This study, conducted in 2009, examines VCT in the public and private sectors including private for-profit and NGO/faith-based sectors in Copperbelt and Luapula. The study used five primary data collection methods to gauge quality of VCT services: closed-ended client interviews with clients exiting VCT sites; open-ended client interviews; interviews with facility managers; review of service statistics; and an observation of the physical environment for VCT by site. Over 400 clients and 87 facility managers were interviewed from almost 90 facilities. Sites were randomly selected and results are generalizable at the provincial level. The study shows concerning levels of underperformance in VCT services across the sectors. It reveals serious underperformance in counselling about key risk-reduction methods. Less than one-third of clients received counselling on reducing number of sexual partners and only approximately 5% of clients received counselling about disclosing test results to partners. In terms of client profiles, the NGO sector attracts the most educated clients and less educated Zambians seek VCT services at very low rates (7%). The private for-profit performs equally or sometimes better than other sectors even though this sector is not adequately integrated into the Zambian national response to HIV. The private for-profit sector provides VCT services on par in quality with the other sectors. Most clients did not receive counselling on partner reduction or disclosure of HIV test results to partners. In a generalized HIV epidemic where multiple concurrent sexual partners are a significant problem for transmitting the disease, risk-reduction methods and discussion should be a main focus of pre-test and post-test counselling. Published by Oxford University Press in association with The London School of Hygiene and Tropical Medicine © The Author 2014; all rights reserved.

  16. EPA FRS Facilities Combined File CSV Download for the Marshall Islands

    EPA Pesticide Factsheets

    The Facility Registry System (FRS) identifies facilities, sites, or places subject to environmental regulation or of environmental interest to EPA programs or delegated states. Using vigorous verification and data management procedures, FRS integrates facility data from program national systems, state master facility records, tribal partners, and other federal agencies and provides the Agency with a centrally managed, single source of comprehensive and authoritative information on facilities.

  17. EPA FRS Facilities Single File CSV Download for the Marshall Islands

    EPA Pesticide Factsheets

    The Facility Registry System (FRS) identifies facilities, sites, or places subject to environmental regulation or of environmental interest to EPA programs or delegated states. Using vigorous verification and data management procedures, FRS integrates facility data from program national systems, state master facility records, tribal partners, and other federal agencies and provides the Agency with a centrally managed, single source of comprehensive and authoritative information on facilities.

  18. Morpheus Media Press Event

    NASA Image and Video Library

    2014-01-17

    CAPE CANAVERAL, Fla. – Members of the news media view the Project Morpheus prototype lander inside a hangar near the Shuttle Landing Facility at NASA’s Kennedy Space Center in Florida. Speaking to the media, from left are Jon Olansen, Morpheus project manager at Johnson Space Center in Houston, and Greg Gaddis, the Kennedy Morpheus and ALHAT site manager. Morpheus successfully completed its third free flight test Jan. 16. The 57-second test began at 1:15 p.m. EST with the Morpheus lander launching from the ground over a flame trench and ascending about 187 feet, nearly doubling the target ascent velocity from the last test in December 2013. The lander flew forward, covering about 154 feet in 20 seconds before descending and landing within 11 inches of its target on a dedicated pad inside the autonomous landing and hazard avoidance technology, or ALHAT, hazard field. Project Morpheus tests NASA’s ALHAT and an engine that runs on liquid oxygen and methane, or green propellants, into a fully-operational lander that could deliver cargo to other planetary surfaces. The landing facility provides the lander with the kind of field necessary for realistic testing, complete with rocks, craters and hazards to avoid. Morpheus’ ALHAT payload allows it to navigate to clear landing sites amidst rocks, craters and other hazards during its descent. Project Morpheus is being managed under the Advanced Exploration Systems, or AES, Division in NASA’s Human Exploration and Operations Mission Directorate. The efforts in AES pioneer new approaches for rapidly developing prototype systems, demonstrating key capabilities and validating operational concepts for future human missions beyond Earth orbit. For more information on Project Morpheus, visit http://www.nasa.gov/centers/johnson/exploration/morpheus. Photo credit: NASA/Kim Shiflett

  19. [Building and implementation of management system in laboratories of the National Institute of Hygiene].

    PubMed

    Rozbicka, Beata; Brulińska-Ostrowska, Elzbieta

    2008-01-01

    The rules of good laboratory practice have always been observed in the laboratories of National Institute of Hygiene (NIH) and the reliability of the results has been carefully cared after when performing tests for clients. In 2003 the laboratories performing analyses related to food safety were designated as the national reference laboratories. This, added to the necessity of compliance with work standards and requirements of EU legislation and to the need of confirmation of competence by an independent organisation, led to a decision to seek accreditation of Polish Centre of Accreditation (PCA). The following stages of building and implementation of management system were presented: training, modifications of Institute's organisational structure, elaboration of management system's documentation, renovation and refurbishment of laboratory facilities, implementation of measuring and test equipment's supervision, internal audits and management review. The importance of earlier experiences and achievements with regard to validation of analytical methods and guarding of the quality of the results through organisation and participation in proficiency tests was highlighted. Current status of accreditation of testing procedures used in NIH laboratories that perform analyses in the field of chemistry, microbiology, radiobiology and medical diagnostic tests was presented.

  20. DCDS: A Real-time Data Capture and Personalized Decision Support System for Heart Failure Patients in Skilled Nursing Facilities.

    PubMed

    Zhu, Wei; Luo, Lingyun; Jain, Tarun; Boxer, Rebecca S; Cui, Licong; Zhang, Guo-Qiang

    2016-01-01

    Heart disease is the leading cause of death in the United States. Heart failure disease management can improve health outcomes for elderly community dwelling patients with heart failure. This paper describes DCDS, a real-time data capture and personalized decision support system for a Randomized Controlled Trial Investigating the Effect of a Heart Failure Disease Management Program (HF-DMP) in Skilled Nursing Facilities (SNF). SNF is a study funded by the NIH National Heart, Lung, and Blood Institute (NHLBI). The HF-DMP involves proactive weekly monitoring, evaluation, and management, following National HF Guidelines. DCDS collects a wide variety of data including 7 elements considered standard of care for patients with heart failure: documentation of left ventricular function, tracking of weight and symptoms, medication titration, discharge instructions, 7 day follow up appointment post SNF discharge and patient education. We present the design and implementation of DCDS and describe our preliminary testing results.

Top