Sample records for testing management system

  1. From an automated flight-test management system to a flight-test engineer's workstation

    NASA Technical Reports Server (NTRS)

    Duke, E. L.; Brumbaugh, R. W.; Hewett, M. D.; Tartt, D. M.

    1992-01-01

    Described here are the capabilities and evolution of a flight-test engineer's workstation (called TEST PLAN) from an automated flight-test management system. The concept and capabilities of the automated flight-test management system are explored and discussed to illustrate the value of advanced system prototyping and evolutionary software development.

  2. From an automated flight-test management system to a flight-test engineer's workstation

    NASA Technical Reports Server (NTRS)

    Duke, E. L.; Brumbaugh, Randal W.; Hewett, M. D.; Tartt, D. M.

    1991-01-01

    The capabilities and evolution is described of a flight engineer's workstation (called TEST-PLAN) from an automated flight test management system. The concept and capabilities of the automated flight test management systems are explored and discussed to illustrate the value of advanced system prototyping and evolutionary software development.

  3. 78 FR 71036 - Pipeline Safety: Random Drug Testing Rate; Contractor Management Information System Reporting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-27

    ... PHMSA-2013-0248] Pipeline Safety: Random Drug Testing Rate; Contractor Management Information System Reporting; and Obtaining Drug and Alcohol Management Information System Sign-In Information AGENCY: Pipeline... Management Information System (MIS) Data; and New Method for Operators to Obtain User Name and Password for...

  4. Individualizing the Teaching of Reading through Test Management Systems.

    ERIC Educational Resources Information Center

    Fry, Edward

    Test management systems are suggested for individualizing the teaching of reading in the elementary classroom. Test management systems start with a list of objectives or specific goals which cover all or some major areas of the learning to read process. They then develop a large number of criterion referenced tests which match the skill areas at…

  5. Visit from JAXA to NASA MSFC: The Engines Element & Ideas for Collaboration

    NASA Technical Reports Server (NTRS)

    Greene, William D.

    2013-01-01

    System Design, Development, and Fabrication: Design, develop, and fabricate or procure MB-60 component hardware compliant with the imposed technical requirements and in sufficient quantities to fulfill the overall MB-60 development effort. System Development, Assembly, and Test: Manage the scope of the development, assembly, and test-related activities for MB-60 development. This scope includes engine-level development planning, engine assembly and disassembly, test planning, engine testing, inspection, anomaly resolution, and development of necessary ground support equipment and special test equipment. System Integration: Provide coordinated integration in the realms of engineering, safety, quality, and manufacturing disciplines across the scope of the MB-60 design and associated products development Safety and Mission Assurance, structural design, fracture control, materials and processes, thermal analysis. Systems Engineering and Analysis: Manage and perform Systems Engineering and Analysis to provide rigor and structure to the overall design and development effort for the MB-60. Milestone reviews, requirements management, system analysis, program management support Program Management: Manage, plan, and coordinate the activities across all portions of the MB-60 work scope by providing direction for program administration, business management, and supplier management.

  6. Automation of the space station core module power management and distribution system

    NASA Technical Reports Server (NTRS)

    Weeks, David J.

    1988-01-01

    Under the Advanced Development Program for Space Station, Marshall Space Flight Center has been developing advanced automation applications for the Power Management and Distribution (PMAD) system inside the Space Station modules for the past three years. The Space Station Module Power Management and Distribution System (SSM/PMAD) test bed features three artificial intelligence (AI) systems coupled with conventional automation software functioning in an autonomous or closed-loop fashion. The AI systems in the test bed include a baseline scheduler/dynamic rescheduler (LES), a load shedding management system (LPLMS), and a fault recovery and management expert system (FRAMES). This test bed will be part of the NASA Systems Autonomy Demonstration for 1990 featuring cooperating expert systems in various Space Station subsystem test beds. It is concluded that advanced automation technology involving AI approaches is sufficiently mature to begin applying the technology to current and planned spacecraft applications including the Space Station.

  7. 75 FR 8528 - Procedures for Transportation Workplace Drug and Alcohol Testing Programs

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-25

    ... updated U.S. DOT Alcohol Testing Form (ATF) and the Management Information System (MIS) Data Collection... included a revised U.S. DOT Alcohol Testing Form (ATF) and the Management Information System (MIS) Data...) and Management Information System (MIS) form Federal Register [73 FR 14300] and [73 FR 33140]. There...

  8. Automated Rocket Propulsion Test Management

    NASA Technical Reports Server (NTRS)

    Walters, Ian; Nelson, Cheryl; Jones, Helene

    2007-01-01

    The Rocket Propulsion Test-Automated Management System provides a central location for managing activities associated with Rocket Propulsion Test Management Board, National Rocket Propulsion Test Alliance, and the Senior Steering Group business management activities. A set of authorized users, both on-site and off-site with regard to Stennis Space Center (SSC), can access the system through a Web interface. Web-based forms are used for user input with generation and electronic distribution of reports easily accessible. Major functions managed by this software include meeting agenda management, meeting minutes, action requests, action items, directives, and recommendations. Additional functions include electronic review, approval, and signatures. A repository/library of documents is available for users, and all items are tracked in the system by unique identification numbers and status (open, closed, percent complete, etc.). The system also provides queries and version control for input of all items.

  9. Expert Assessment of Conditions for Accredited Quality Management System Functioning in Testing Laboratories

    NASA Astrophysics Data System (ADS)

    Mytych, Joanna; Ligarski, Mariusz J.

    2018-03-01

    The quality management systems compliant with the ISO 9001:2009 have been thoroughly researched and described in detail in the world literature. The accredited management systems used in the testing laboratories and compliant with the ISO/IEC 17025:2005 have been mainly described in terms of the system design and implementation. They have also been investigated from the analytical point of view. Unfortunately, a low number of studies concerned the management system functioning in the accredited testing laboratories. The aim of following study was to assess the management system functioning in the accredited testing laboratories in Poland. On 8 October 2015, 1,213 accredited testing laboratories were present in Poland. They investigated various scientific areas and substances/objects. There are more and more such laboratories that have various problems and different long-term experience when it comes to the implementation, maintenance and improvement of the management systems. The article describes the results of the conducted expert assessment (survey) carried out to examine the conditions for the functioning of a management system in an accredited laboratory. It also focuses on the characteristics of the accredited research laboratories in Poland. The authors discuss the selection of the external and internal conditions that may affect the accredited management system. They show how the experts assessing the selected conditions were chosen. The survey results are also presented.

  10. Laboratory information management system: an example of international cooperation in Namibia.

    PubMed

    Colangeli, Patrizia; Ferrilli, Monica; Quaranta, Fabrizio; Malizia, Elio; Mbulu, Rosa-Stella; Mukete, Esther; Iipumbu, Lukas; Kamhulu, Anna; Tjipura-Zaire, Georgina; Di Francesco, Cesare; Lelli, Rossella; Scacchia, Massimo

    2012-01-01

    The authors describe the project undertaken by the Istituto G. Caporale to provide a laboratory information management system (LIMS) to the Central Veterinary Laboratory (CVL) in Windhoek, Namibia. This robust laboratory management tool satisfies Namibia's information obligations under international quality standard ISO 17025:2005. The Laboratory Information Management System (LIMS) for Africa was designed to collect and manage all necessary information on samples, tests and test results. The system involves the entry of sample data on arrival, as required by Namibian sampling plans, the tracking of samples through the various sections of the CVL, the collection of test results, generation of test reports and monitoring of outbreaks through data interrogation functions, eliminating multiple registrations of the same data on paper records. It is a fundamental component of the Namibian veterinary information system.

  11. NEXT Single String Integration Test Results

    NASA Technical Reports Server (NTRS)

    Soulas, George C.; Patterson, Michael J.; Pinero, Luis; Herman, Daniel A.; Snyder, Steven John

    2010-01-01

    As a critical part of NASA's Evolutionary Xenon Thruster (NEXT) test validation process, a single string integration test was performed on the NEXT ion propulsion system. The objectives of this test were to verify that an integrated system of major NEXT ion propulsion system elements meets project requirements, to demonstrate that the integrated system is functional across the entire power processor and xenon propellant management system input ranges, and to demonstrate to potential users that the NEXT propulsion system is ready for transition to flight. Propulsion system elements included in this system integration test were an engineering model ion thruster, an engineering model propellant management system, an engineering model power processor unit, and a digital control interface unit simulator that acted as a test console. Project requirements that were verified during this system integration test included individual element requirements ; integrated system requirements, and fault handling. This paper will present the results of these tests, which include: integrated ion propulsion system demonstrations of performance, functionality and fault handling; a thruster re-performance acceptance test to establish baseline performance: a risk-reduction PMS-thruster integration test: and propellant management system calibration checks.

  12. 49 CFR Appendix H to Part 40 - DOT Drug and Alcohol Testing Management Information System (MIS) Data Collection Form

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., App. H Appendix H to Part 40—DOT Drug and Alcohol Testing Management Information System (MIS) Data... 49 Transportation 1 2010-10-01 2010-10-01 false DOT Drug and Alcohol Testing Management Information System (MIS) Data Collection Form H Appendix H to Part 40 Transportation Office of the Secretary...

  13. 49 CFR Appendix H to Part 40 - DOT Drug and Alcohol Testing Management Information System (MIS) Data Collection Form

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., App. H Appendix H to Part 40—DOT Drug and Alcohol Testing Management Information System (MIS) Data... 49 Transportation 1 2013-10-01 2013-10-01 false DOT Drug and Alcohol Testing Management Information System (MIS) Data Collection Form H Appendix H to Part 40 Transportation Office of the Secretary...

  14. 49 CFR Appendix H to Part 40 - DOT Drug and Alcohol Testing Management Information System (MIS) Data Collection Form

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., App. H Appendix H to Part 40—DOT Drug and Alcohol Testing Management Information System (MIS) Data... 49 Transportation 1 2014-10-01 2014-10-01 false DOT Drug and Alcohol Testing Management Information System (MIS) Data Collection Form H Appendix H to Part 40 Transportation Office of the Secretary...

  15. 49 CFR Appendix H to Part 40 - DOT Drug and Alcohol Testing Management Information System (MIS) Data Collection Form

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., App. H Appendix H to Part 40—DOT Drug and Alcohol Testing Management Information System (MIS) Data... 49 Transportation 1 2012-10-01 2012-10-01 false DOT Drug and Alcohol Testing Management Information System (MIS) Data Collection Form H Appendix H to Part 40 Transportation Office of the Secretary...

  16. 49 CFR Appendix H to Part 40 - DOT Drug and Alcohol Testing Management Information System (MIS) Data Collection Form

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., App. H Appendix H to Part 40—DOT Drug and Alcohol Testing Management Information System (MIS) Data... 49 Transportation 1 2011-10-01 2011-10-01 false DOT Drug and Alcohol Testing Management Information System (MIS) Data Collection Form H Appendix H to Part 40 Transportation Office of the Secretary...

  17. The United States Army Logistics Center Historical Summary. (RCS-HIS-6 (R2)). 1 October 1976 to 30 September 1978.

    DTIC Science & Technology

    1980-01-10

    Experimentation (FDTE) 138 Corps Automation Requirements Baseline Identification Test (CARBIT) 138 Division Materiel Management Center (DMMC) 139 Concept...Evaluation Programs (CEP) 139 Test Design and Evaluation 140 Test and Evaluation Milestone Management System (TEMMS) 140 Manpower Analysis/Force...System (CS3) Maintenance Reporting and Management (MRM) 153 DA - Standard Port System (DASPS) 154 DA - Standard Port System - Enhancement (DASPS-E) 155 DA

  18. Thermal Management Coating As Thermal Protection System for Space Transportation System

    NASA Technical Reports Server (NTRS)

    Kaul, Raj; Stuckey, C. Irvin

    2003-01-01

    This paper presents viewgraphs on the development of a non-ablative thermal management coating used as the thermal protection system material for space shuttle rocket boosters and other launch vehicles. The topics include: 1) Coating Study; 2) Aerothermal Testing; 3) Preconditioning Environments; 4) Test Observations; 5) Lightning Strike Test Panel; 6) Test Panel After Impact Testing; 7) Thermal Testing; and 8) Mechanical Testing.

  19. Space telescope observatory management system preliminary test and verification plan

    NASA Technical Reports Server (NTRS)

    Fritz, J. S.; Kaldenbach, C. F.; Williams, W. B.

    1982-01-01

    The preliminary plan for the Space Telescope Observatory Management System Test and Verification (TAV) is provided. Methodology, test scenarios, test plans and procedure formats, schedules, and the TAV organization are included. Supporting information is provided.

  20. Laboratory Information Systems in Molecular Diagnostics: Why Molecular Diagnostics Data are Different.

    PubMed

    Lee, Roy E; Henricks, Walter H; Sirintrapun, Sahussapont J

    2016-03-01

    Molecular diagnostic testing presents new challenges to information management that are yet to be sufficiently addressed by currently available information systems for the molecular laboratory. These challenges relate to unique aspects of molecular genetic testing: molecular test ordering, informed consent issues, diverse specimen types that encompass the full breadth of specimens handled by traditional anatomic and clinical pathology information systems, data structures and data elements specific to molecular testing, varied testing workflows and protocols, diverse instrument outputs, unique needs and requirements of molecular test reporting, and nuances related to the dissemination of molecular pathology test reports. By satisfactorily addressing these needs in molecular test data management, a laboratory information system designed for the unique needs of molecular diagnostics presents a compelling reason to migrate away from the current paper and spreadsheet information management that many molecular laboratories currently use. This paper reviews the issues and challenges of information management in the molecular diagnostics laboratory.

  1. Automated flight test management system

    NASA Technical Reports Server (NTRS)

    Hewett, M. D.; Tartt, D. M.; Agarwal, A.

    1991-01-01

    The Phase 1 development of an automated flight test management system (ATMS) as a component of a rapid prototyping flight research facility for artificial intelligence (AI) based flight concepts is discussed. The ATMS provides a flight engineer with a set of tools that assist in flight test planning, monitoring, and simulation. The system is also capable of controlling an aircraft during flight test by performing closed loop guidance functions, range management, and maneuver-quality monitoring. The ATMS is being used as a prototypical system to develop a flight research facility for AI based flight systems concepts at NASA Ames Dryden.

  2. NASA's Evolutionary Xenon Thruster (NEXT) Prototype Model 1R (PM1R) Ion Thruster and Propellant Management System Wear Test Results

    NASA Technical Reports Server (NTRS)

    VanNoord, Jonathan L.; Soulas, George C.; Sovey, James S.

    2010-01-01

    The results of the NEXT wear test are presented. This test was conducted with a 36-cm ion engine (designated PM1R) and an engineering model propellant management system. The thruster operated with beam extraction for a total of 1680 hr and processed 30.5 kg of xenon during the wear test, which included performance testing and some operation with an engineering model power processing unit. A total of 1312 hr was accumulated at full power, 277 hr at low power, and the remainder was at intermediate throttle levels. Overall ion engine performance, which includes thrust, thruster input power, specific impulse, and thrust efficiency, was steady with no indications of performance degradation. The propellant management system performed without incident during the wear test. The ion engine and propellant management system were also inspected following the test with no indication of anomalous hardware degradation from operation.

  3. Integrated System Health Management: Pilot Operational Implementation in a Rocket Engine Test Stand

    NASA Technical Reports Server (NTRS)

    Figueroa, Fernando; Schmalzel, John L.; Morris, Jonathan A.; Turowski, Mark P.; Franzl, Richard

    2010-01-01

    This paper describes a credible implementation of integrated system health management (ISHM) capability, as a pilot operational system. Important core elements that make possible fielding and evolution of ISHM capability have been validated in a rocket engine test stand, encompassing all phases of operation: stand-by, pre-test, test, and post-test. The core elements include an architecture (hardware/software) for ISHM, gateways for streaming real-time data from the data acquisition system into the ISHM system, automated configuration management employing transducer electronic data sheets (TEDS?s) adhering to the IEEE 1451.4 Standard for Smart Sensors and Actuators, broadcasting and capture of sensor measurements and health information adhering to the IEEE 1451.1 Standard for Smart Sensors and Actuators, user interfaces for management of redlines/bluelines, and establishment of a health assessment database system (HADS) and browser for extensive post-test analysis. The ISHM system was installed in the Test Control Room, where test operators were exposed to the capability. All functionalities of the pilot implementation were validated during testing and in post-test data streaming through the ISHM system. The implementation enabled significant improvements in awareness about the status of the test stand, and events and their causes/consequences. The architecture and software elements embody a systems engineering, knowledge-based approach; in conjunction with object-oriented environments. These qualities are permitting systematic augmentation of the capability and scaling to encompass other subsystems.

  4. [Knowledge management system for laboratory work and clinical decision support].

    PubMed

    Inada, Masanori; Sato, Mayumi; Yoneyama, Akiko

    2011-05-01

    This paper discusses a knowledge management system for clinical laboratories. In the clinical laboratory of Toranomon Hospital, we receive about 20 questions relevant to laboratory tests per day from medical doctors or co-medical staff. These questions mostly involve the essence to appropriately accomplish laboratory tests. We have to answer them carefully and suitably because an incorrect answer may cause a medical accident. Up to now, no method has been in place to achieve a rapid response and standardized answers. For this reason, the laboratory staff have responded to various questions based on their individual knowledge. We began to develop a knowledge management system to promote the knowledge of staff working for the laboratory. This system is a type of knowledge base for assisting the work, such as inquiry management, laboratory consultation, process management, and clinical support. It consists of several functions: guiding laboratory test information, managing inquiries from medical staff, reporting results of patient consultation, distributing laboratory staffs notes, and recording guidelines for laboratory medicine. The laboratory test information guide has 2,000 records of medical test information registered in the database with flexible retrieval. The inquiry management tool provides a methos to record all questions, answer easily, and retrieve cases. It helps staff to respond appropriately in a short period of time. The consulting report system treats patients' claims regarding medical tests. The laboratory staffs notes enter a file management system so they can be accessed to aid in clinical support. Knowledge sharing using this function can achieve the transition from individual to organizational learning. Storing guidelines for laboratory medicine will support EBM. Finally, it is expected that this system will support intellectual activity concerning laboratory work and contribute to the practice of knowledge management for clinical work support.

  5. 78 FR 60245 - Privacy Act Systems of Records; LabWare Laboratory Information Management System

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-01

    ... Services Laboratories (NVSL). Diagnostic testing provides official test results for animal imports, exports.... Diagnostic testing is also done in connection with suspected foreign animal disease investigations and... of Records; LabWare Laboratory Information Management System AGENCY: Animal and Plant Health...

  6. Design and implementation of web service-based mobile reply testing management system

    NASA Astrophysics Data System (ADS)

    Gao, Liang; Han, Yu-min

    2013-03-01

    This paper introduces the design and implementation of a reply testing management system that based-on C#, Web Service and ASP .Net. With the system, teachers can manage reply site through Windows Mobile, judges can grade onscene by visiting WAP site through GPRS. Then this paper discusses details of the implementation and key technologies of the system.

  7. A Comparative Analysis of the Resources Required for Test and Evaluation on Army-Led Weapon System Programs, Based Upon Program Size and Acquisition Management Complexity

    DTIC Science & Technology

    2007-12-01

    Program Manager PMO Program Manager Office POM Program Objective Memorandum PPE Personal Protective Equipment PPT Production Prove...test • Technical feasibility test • Engineering development test • Production prove-out test ( PPT ) • Software qualification test 22 • Live fire...improvement BIDS (P3I) system is equipped with a detection suite to include high volume samplers, a fluorescent particle counter/sizer, a flow

  8. Coliform Bacteria Monitoring in Fish Systems: Current Practices in Public Aquaria.

    PubMed

    Culpepper, Erin E; Clayton, Leigh A; Hadfield, Catherine A; Arnold, Jill E; Bourbon, Holly M

    2016-06-01

    Public aquaria evaluate coliform indicator bacteria levels in fish systems, but the purpose of testing, testing methods, and management responses are not standardized, unlike with the coliform bacteria testing for marine mammal enclosures required by the U.S. Department of Agriculture. An online survey was sent to selected aquaria to document current testing and management practices in fish systems without marine mammals. The information collected included indicator bacteria species, the size and type of systems monitored, the primary purpose of testing, sampling frequency, test methods, the criteria for interpreting results, corrective actions, and management changes to limit human exposure. Of the 25 institutions to which surveys were sent, 19 (76%) responded. Fourteen reported testing for fecal indicator bacteria in fish systems. The most commonly tested indicator species were total (86%) and fecal (79%) coliform bacteria, which were detected by means of the membrane filtration method (64%). Multiple types and sizes of systems were tested, and the guidelines for testing and corrective actions were highly variable. Only three institutions performed additional tests to confirm the identification of indicator organisms. The results from this study can be used to compare bacterial monitoring practices and protocols in fish systems, as an aid to discussions relating to the accuracy and reliability of test results, and to help implement appropriate management responses. Received August 23, 2015; accepted December 29, 2015.

  9. Integrated water management system - Description and test results. [for Space Station waste water processing

    NASA Technical Reports Server (NTRS)

    Elden, N. C.; Winkler, H. E.; Price, D. F.; Reysa, R. P.

    1983-01-01

    Water recovery subsystems are being tested at the NASA Lyndon B. Johnson Space Center for Space Station use to process waste water generated from urine and wash water collection facilities. These subsystems are being integrated into a water management system that will incorporate wash water and urine processing through the use of hyperfiltration and vapor compression distillation subsystems. Other hardware in the water management system includes a whole body shower, a clothes washing facility, a urine collection and pretreatment unit, a recovered water post-treatment system, and a water quality monitor. This paper describes the integrated test configuration, pertinent performance data, and feasibility and design compatibility conclusions of the integrated water management system.

  10. Performance Evaluation of a Data Validation System

    NASA Technical Reports Server (NTRS)

    Wong, Edmond (Technical Monitor); Sowers, T. Shane; Santi, L. Michael; Bickford, Randall L.

    2005-01-01

    Online data validation is a performance-enhancing component of modern control and health management systems. It is essential that performance of the data validation system be verified prior to its use in a control and health management system. A new Data Qualification and Validation (DQV) Test-bed application was developed to provide a systematic test environment for this performance verification. The DQV Test-bed was used to evaluate a model-based data validation package known as the Data Quality Validation Studio (DQVS). DQVS was employed as the primary data validation component of a rocket engine health management (EHM) system developed under NASA's NGLT (Next Generation Launch Technology) program. In this paper, the DQVS and DQV Test-bed software applications are described, and the DQV Test-bed verification procedure for this EHM system application is presented. Test-bed results are summarized and implications for EHM system performance improvements are discussed.

  11. Distribution Management System Volt/VAR Evaluation | Grid Modernization |

    Science.gov Websites

    NREL Distribution Management System Volt/VAR Evaluation Distribution Management System Volt/VAR Evaluation This project involves building a prototype distribution management system testbed that links a GE Grid Solutions distribution management system to power hardware-in-the-loop testing. This setup is

  12. Integrated System Test of the Advanced Instructional System (AIS). Final Report.

    ERIC Educational Resources Information Center

    Lintz, Larry M.; And Others

    The integrated system test for the Advanced Instructional System (AIS) was designed to provide quantitative information regarding training time reductions resulting from certain computer managed instruction features. The reliabilities of these features and of support systems were also investigated. Basic computer managed instruction reduced…

  13. Data base management study

    NASA Technical Reports Server (NTRS)

    1976-01-01

    Data base management techniques and applicable equipment are described. Recommendations which will assist potential NASA data users in selecting and using appropriate data base management tools and techniques are presented. Classes of currently available data processing equipment ranging from basic terminals to large minicomputer systems were surveyed as they apply to the needs of potential SEASAT data users. Cost and capabilities projections for this equipment through 1985 were presented. A test of a typical data base management system was described, as well as the results of this test and recommendations to assist potential users in determining when such a system is appropriate for their needs. The representative system tested was UNIVAC's DMS 1100.

  14. NATO Guidelines on Human Engineering Testing and Evaluation

    DTIC Science & Technology

    2001-05-01

    1980s and is known as Manpower, Personnel, and Training Integration (MANPRINT). The objective of this comprehensive management and technical effort is...systems under benign test conditions, using test subjects who are considerably more knowledeable of the system than the eventual users of the system will...Technical Management , Aeronautical Systems Division, Air Force Systems Command. Itoh, Y., Hayashi, Y., Tsukui, L, and Saito, S. (1989). Heart rate

  15. 46 CFR 162.060-30 - Testing requirements for ballast water management system (BWMS) components.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 6 2012-10-01 2012-10-01 false Testing requirements for ballast water management system (BWMS) components. 162.060-30 Section 162.060-30 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL ENGINEERING EQUIPMENT Ballast Water Management Systems § 162.060...

  16. Real-Time Rocket/Vehicle System Integrated Health Management Laboratory For Development and Testing of Health Monitoring/Management Systems

    NASA Technical Reports Server (NTRS)

    Aguilar, R.

    2006-01-01

    Pratt & Whitney Rocketdyne has developed a real-time engine/vehicle system integrated health management laboratory, or testbed, for developing and testing health management system concepts. This laboratory simulates components of an integrated system such as the rocket engine, rocket engine controller, vehicle or test controller, as well as a health management computer on separate general purpose computers. These general purpose computers can be replaced with more realistic components such as actual electronic controllers and valve actuators for hardware-in-the-loop simulation. Various engine configurations and propellant combinations are available. Fault or failure insertion capability on-the-fly using direct memory insertion from a user console is used to test system detection and response. The laboratory is currently capable of simulating the flow-path of a single rocket engine but work is underway to include structural and multiengine simulation capability as well as a dedicated data acquisition system. The ultimate goal is to simulate as accurately and realistically as possible the environment in which the health management system will operate including noise, dynamic response of the engine/engine controller, sensor time delays, and asynchronous operation of the various components. The rationale for the laboratory is also discussed including limited alternatives for demonstrating the effectiveness and safety of a flight system.

  17. Application of semi-active RFID power meter in automatic verification pipeline and intelligent storage system

    NASA Astrophysics Data System (ADS)

    Chen, Xiangqun; Huang, Rui; Shen, Liman; chen, Hao; Xiong, Dezhi; Xiao, Xiangqi; Liu, Mouhai; Xu, Renheng

    2018-03-01

    In this paper, the semi-active RFID watt-hour meter is applied to automatic test lines and intelligent warehouse management, from the transmission system, test system and auxiliary system, monitoring system, realize the scheduling of watt-hour meter, binding, control and data exchange, and other functions, make its more accurate positioning, high efficiency of management, update the data quickly, all the information at a glance. Effectively improve the quality, efficiency and automation of verification, and realize more efficient data management and warehouse management.

  18. A smartphone-based system for the automated management of point-of-care test results in hospitals.

    PubMed

    Jang, Dasom; Shin, Soo-Yong; Seo, Dong-Woo; Joo, Segyeong; Huh, Soo-Jin

    2015-04-01

    Managing test results is an important issue in hospitals because of the increasing use of point-of-care testing (POCT). Here, we propose a smartphone-based system for automatically managing POCT test results. We developed the system to provide convenience to the medical staffs. The system recognizes the patient identification or prescription number of the test by reading barcodes and provides a countdown to indicate when the results will be ready. When the countdown in finished, a picture of the test result is transferred to the electronic medical record server using the Health Level 7 protocol. Human immunodeficiency virus (HIV) kits were selected in this research because HIV is a life-threatening infectious virus, especially for the medical staff who treat undiagnosed patients. The performance of the system was verified from a survey of the users. The performance of the system was tested at the emergency room (ER) for 10 months using commercially available POCT kits for detecting HIV. The survey showed that, in total, 80% and 0% of users reported positive or negative feedback, respectively. The staff also reported that the system reduced total processing time by approximately 32 min, in addition to reducing workload. The developed automated management system was successfully tested at an ER for 10 months. The survey results show that the system is effective and that medical staff members who used the system are satisfied with using the system at the ER.

  19. TTCN-3 Based Conformance Testing of Mobile Broadcast Business Management System in 3G Networks

    NASA Astrophysics Data System (ADS)

    Wang, Zhiliang; Yin, Xia; Xiang, Yang; Zhu, Ruiping; Gao, Shirui; Wu, Xin; Liu, Shijian; Gao, Song; Zhou, Li; Li, Peng

    Mobile broadcast service is one of the emerging most important new services in 3G networks. To better operate and manage mobile broadcast services, mobile broadcast business management system (MBBMS) should be designed and developed. Such a system, with its distributed nature, complicated XML data and security mechanism, faces many challenges in testing technology. In this paper, we study the conformance testing methodology of MBBMS, and design and implement a MBBMS protocol conformance testing tool based on TTCN-3, a standardized test description language that can be used in black-box testing of reactive and distributed system. In this methodology and testing tool, we present a semi-automatic XML test data generation method of TTCN-3 test suite and use HMSC model to help the design of test suite. In addition, we also propose an integrated testing method for hierarchical MBBMS security architecture. This testing tool has been used in industrial level’s testing.

  20. Portable traffic management system smart work zone application : operational test evaluation report

    DOT National Transportation Integrated Search

    1997-05-01

    As part of its statewide Intelligent Transportation System (ITS), The Minnesota Department of Transportation (Mn/DOT) sponsored an operational test of the Portable Traffic Management System (PTMS) in a work zone application in cooperation with its pr...

  1. Photovoltaic system criteria documents. Volume 1: Guidelines for evaluating the management and operations planning of photovoltaic applications

    NASA Technical Reports Server (NTRS)

    Koenig, John C.; Billitti, Joseph W.; Tallon, John M.

    1979-01-01

    Guidelines are provided to the Field Centers for organization, scheduling, project and cost control, and performance in the areas of project management and operations planning for Photovoltaics Test and Applications. These guidelines may be used in organizing a T and A Project Team for system design/test, site construction and operation, and as the basis for evaluating T and A proposals. The attributes are described for project management and operations planning to be used by the Field Centers. Specifically, all project management and operational issues affecting costs, schedules and performance of photovoltaic systems are addressed. Photovoltaic tests and applications include residential, intermediate load center, central station, and stand-alone systems. The sub-categories of system maturity considered are: Initial System Evaluation Experiments (ISEE); System Readiness Experiments (SRE); and Commercial Readiness Demonstration Projects (CRDP).

  2. An information system to improve financial management, resource allocation and activity planning: evaluation results.

    PubMed

    Ruland, C M; Ravn, I H

    2001-01-01

    An important strategy for improving resource management and cost containment in health care is to develop information systems that assist hospital managers in financial management, resource allocation, and activity planning. A crucial part of such development is a rigorous evaluation to assess whether the system accomplishes it's intended goals. To evaluate CLASSICA, a Decision Support System (DSS), that assists nurse managers in financial management, resource allocation, staffing, and activity planning. Using a pre-post test design with control units, CLASSICA was evaluated in four test units. Baseline data and simultaneous parallel measures were collected prior to system implementation at test sites and control units. Using expense reports, staffing and financial statistics, surveys, interviews with nurse managers, and logs as data sources, CLASSICA was evaluated on: cost reduction, quality of management information; usefulness as decision support for improved financial management and decision-making; user satisfaction; and ease of use. Evaluation results showed a 41% reduction in expenditures for overtime and extra hours as compared to a 1.8% reduction in control units during the same time period. Users reported a significant improvement in management information; nurse managers stated that they had gained control over costs. The system helped them analyze the relationships between patient activity staffing, and cost of care. Users reported high satisfaction with the system, the information and decision support it provided, and its ease of use. These results suggest that CLASSICA is a DSS that successfully assists nurse managers in cost effective management of their units.

  3. Pilot Test and Evaluation of a System of Computer-Managed Instruction.

    ERIC Educational Resources Information Center

    Spuck, Dennis W.; Bozeman, William C.

    1978-01-01

    The Wisconsin System for Instructional Management (WIS SIM) was evaluated on three dimensions (functioning, utilization, and effects) and the information gathered was classified into three types--actual, perceptual, and judgmental. The test demonstrates that a system supportive of an individualized system of education can be designed, developed,…

  4. Automating the Air Force Retail-Level Equipment Management Process: An Application of Microcomputer-Based Information Systems Techniques

    DTIC Science & Technology

    1988-09-01

    could use the assistance of a microcomputer-based management information system . However, adequate system design and development requires an in-depth...understanding of the Equipment Management Section and the environment in which it functions were asked and answered. Then, a management information system was...designed, developed, and tested. The management information system is called the Equipment Management Information System (EMIS).

  5. 75 FR 1547 - Alcohol and Drug Testing: Determination of Minimum Random Testing Rates for 2010

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-12

    ...: Notice of Determination. SUMMARY: Using data from Management Information System annual reports, FRA has... taken from FRA's Management Information System. Based on this data, the Administrator publishes a... effective upon publication. FOR FURTHER INFORMATION CONTACT: Lamar Allen, Alcohol and Drug Program Manager...

  6. 75 FR 79308 - Alcohol and Drug Testing: Determination of Minimum Random Testing Rates for 2011

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-20

    ... from Management Information System annual reports, FRA has determined that the 2009 rail industry... program data taken from FRA's Management Information System. Based on this data, the Administrator... effective December 20, 2010. FOR FURTHER INFORMATION CONTACT: Lamar Allen, Alcohol and Drug Program Manager...

  7. Spectrum Management Guidelines for National and Service Test and Training Ranges

    DTIC Science & Technology

    2017-07-12

    GPS Global Positioning System ISM Installation Spectrum Manager JTIDS Joint Tactical Information Distribution System KMR Kwajalein Missile Range... information UAV unmanned aerial vehicle US&P United States and Possessions Spectrum Management Guidelines for National and Service Test and Training...frequency deconfliction processes. The AFC will inform the range or center commander and the Installation Spectrum Manager (ISM) at the

  8. Crawler Acquisition and Testing Demonstration Project Management Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    DEFIGH-PRICE, C.

    2000-10-23

    If the crawler based retrieval system is selected, this project management plan identifies the path forward for acquiring a crawler/track pump waste retrieval system, and completing sufficient testing to support deploying the crawler for as part of a retrieval technology demonstration for Tank 241-C-104. In the balance of the document, these activities will be referred to as the Crawler Acquisition and Testing Demonstration. During recent Tri-Party Agreement negotiations, TPA milestones were proposed for a sludge/hard heel waste retrieval demonstration in tank C-104. Specifically one of the proposed milestones requires completion of a cold demonstration of sufficient scale to support finalmore » design and testing of the equipment (M-45-03G) by 6/30/2004. A crawler-based retrieval system was one of the two options evaluated during the pre-conceptual engineering for C-104 retrieval (RPP-6843 Rev. 0). The alternative technology procurement initiated by the Hanford Tanks Initiative (HTI) project, combined with the pre-conceptual engineering for C-104 retrieval provide an opportunity to achieve compliance with the proposed TPA milestone M-45-03H. This Crawler Acquisition and Testing Demonstration project management plan identifies the plans, organizational interfaces and responsibilities, management control systems, reporting systems, timeline and requirements for the acquisition and testing of the crawler based retrieval system. This project management plan is complimentary to and supportive of the Project Management Plan for Retrieval of C-104 (RPP-6557). This project management plan focuses on utilizing and completing the efforts initiated under the Hanford Tanks Initiative (HTI) to acquire and cold test a commercial crawler based retrieval system. The crawler-based retrieval system will be purchased on a schedule to support design of the waste retrieval from tank C-104 (project W-523) and to meet the requirement of proposed TPA milestone M-45-03H. This Crawler Acquisition and Testing Demonstration project management plan includes the following: (1) Identification of acquisition strategy and plan to obtain a crawler based retrieval system; (2) Plan for sufficient cold testing to make a decision for W-523 and to comply with TPA Milestone M-45-03H; (3) Cost and schedule for path forward; (4) Responsibilities of the participants; and (5) The plan is supported by updated Level 1 logics, a Relative Order of Magnitude cost estimate and preliminary project schedule.« less

  9. 46 CFR 16.500 - Management Information System requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 1 2010-10-01 2010-10-01 false Management Information System requirements. 16.500 Section 16.500 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY MERCHANT MARINE OFFICERS AND SEAMEN CHEMICAL TESTING Management Information System § 16.500 Management Information System requirements. (a...

  10. 46 CFR 16.500 - Management Information System requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 1 2013-10-01 2013-10-01 false Management Information System requirements. 16.500 Section 16.500 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY MERCHANT MARINE OFFICERS AND SEAMEN CHEMICAL TESTING Management Information System § 16.500 Management Information System requirements. (a...

  11. 46 CFR 16.500 - Management Information System requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 1 2011-10-01 2011-10-01 false Management Information System requirements. 16.500 Section 16.500 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY MERCHANT MARINE OFFICERS AND SEAMEN CHEMICAL TESTING Management Information System § 16.500 Management Information System requirements. (a...

  12. 46 CFR 16.500 - Management Information System requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 1 2014-10-01 2014-10-01 false Management Information System requirements. 16.500 Section 16.500 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY MERCHANT MARINE OFFICERS AND SEAMEN CHEMICAL TESTING Management Information System § 16.500 Management Information System requirements. (a...

  13. 46 CFR 16.500 - Management Information System requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 1 2012-10-01 2012-10-01 false Management Information System requirements. 16.500 Section 16.500 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY MERCHANT MARINE OFFICERS AND SEAMEN CHEMICAL TESTING Management Information System § 16.500 Management Information System requirements. (a...

  14. Commercial Skills Test Information Management System final report and self-sustainability plan : [technology brief].

    DOT National Transportation Integrated Search

    2014-04-01

    The Commercial Skills Test Information Management System (CSTIMS) was developed to address the fraudulent issuance of commercial drivers licenses (CDLs) across the United States. CSTIMS was developed as a Web-based, software-as-a-service system to...

  15. 12 CFR Appendix to Part 1236 - Prudential Management and Operations Standards

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... risk exposure. Standard 4—Management of Market Risk—Measurement Systems, Risk Limits, Stress Testing... stress test outcomes to adjust its market risk management strategies, policies, and positions and to... entity should use stress test outcomes to adjust its liquidity management strategies, policies, and...

  16. Optimizing point-of-care testing in clinical systems management.

    PubMed

    Kost, G J

    1998-01-01

    The goal of improving medical and economic outcomes calls for leadership based on fundamental principles. The manager of clinical systems works collaboratively within the acute care center to optimize point-of-care testing through systematic approaches such as integrative strategies, algorithms, and performance maps. These approaches are effective and efficacious for critically ill patients. Optimizing point-of-care testing throughout the entire health-care system is inherently more difficult. There is potential to achieve high-quality testing, integrated disease management, and equitable health-care delivery. Despite rapid change and economic uncertainty, a macro-strategic, information-integrated, feedback-systems, outcomes-oriented approach is timely, challenging, effective, and uplifting to the creative human spirit.

  17. A test manager's perspective of a test concept for a heavy lift vehicle

    NASA Technical Reports Server (NTRS)

    Pargeon, John I., Jr.

    1990-01-01

    The developmment of a test concept is a significant part of the advanced planning activities accomplished for the Initial Operational Test and Evaluation (IOT&E) of new systems. A test concept is generally viewed as a description, including rationale, of the test structure, evaluation methodology and management approach required to plan and conduct the IOT&E of a program such as a new heavy lift launch vehicle system. The test concept as presented in this paper is made up of an operations area, a test area, an evaluation area, and a management area. The description presented here is written from the perspective of one test manager, and represents his views of a possible framework of a test concept using examples for a potential IOT&E of a heavy lift launch vehicle.

  18. Systematic and Scalable Testing of Concurrent Programs

    DTIC Science & Technology

    2013-12-16

    The evaluation of CHESS [107] checked eight different programs ranging from process management libraries to a distributed execution engine to a research...tool (§3.1) targets systematic testing of scheduling nondeterminism in multi- threaded components of the Omega cluster management system [129], while...tool for systematic testing of multithreaded com- ponents of the Omega cluster management system [129]. In particular, §3.1.1 defines a model for

  19. Commercial Skills Test Information Management System (CSTIMS) final report and self-sustainability plan.

    DOT National Transportation Integrated Search

    2014-03-01

    The Commercial Skills Test Information Management System (CSTIMS) was developed as a Web-based, software-as-a-service system to prevent and deter fraud perpetrated by third-party commercial drivers license (CDL) examiners in the portion of the CDL...

  20. 75 FR 2926 - Pipeline Safety: Reporting Drug and Alcohol Test Results for Contractors and Multiple Operator...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-19

    ... Management Information System (DAMIS) to allow the reporting of contractor data without duplication and will begin collecting annual drug and alcohol testing data for contractor employees with Management... regulated by 49 CFR Parts 192, 193, and 195. In a final rule titled ``Management Information System (MIS...

  1. Programs for Testing an SSME-Monitoring System

    NASA Technical Reports Server (NTRS)

    Lang, Andre; Cecil, Jimmie; Heusinger, Ralph; Freestone, Kathleen; Blue, Lisa; Wilkerson, DeLisa; McMahon, Leigh Anne; Hall, Richard B.; Varnavas, Kosta; Smith, Keary; hide

    2007-01-01

    A suite of computer programs has been developed for special test equipment (STE) that is used in verification testing of the Health Management Computer Integrated Rack Assembly (HMCIRA), a ground-based system of analog and digital electronic hardware and software for "flight-like" testing for development of components of an advanced health-management system for the space shuttle main engine (SSME). The STE software enables the STE to simulate the analog input and the data flow of an SSME test firing from start to finish.

  2. System integration test plan for HANDI 2000 business management system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wilson, D.

    This document presents the system integration test plan for the Commercial-Off-The-Shelf, PassPort and PeopleSoft software, and custom software created to work with the COTS products. The PP software is an integrated application for AP, Contract Management, Inventory Management, Purchasing and Material Safety Data Sheet. The PS software is an integrated application for Project Costing, General Ledger, Human Resources/Training, Payroll, and Base Benefits.

  3. Integrated corridor management initiative : demonstration phase evaluation, San Diego traveler response analysis test plan.

    DOT National Transportation Integrated Search

    1995-10-01

    REAL-TIME TRAFFIC INFORMATION, ROUTE GUIDANCE, ROUTE PLANNING, INTELLIGENT VEHICLE INITIATIVE OR IVI ">">KEYWORDS: OPERATIONAL TESTS, TRAVTEK, ADVANCED TRAVELER INFORMATION SYSTEMS OR ATIS, ADVANCED TRAFFIC MANAGEMENT SYSTEMS OR ATMS, INTELLI...

  4. Experiences with establishing and implementing learning management system and computer-based test system in medical college.

    PubMed

    Park, Joo Hyun; Son, Ji Young; Kim, Sun

    2012-09-01

    The purpose of this study was to establish an e-learning system to support learning in medical education and identify solutions for improving the system. A learning management system (LMS) and computer-based test (CBT) system were established to support e-learning for medical students. A survey of 219 first- and second-grade medical students was administered. The questionnaire included 9 forced choice questions about the usability of system and 2 open-ended questions about necessary improvements to the system. The LMS consisted of a class management, class evaluation, and class attendance system. CBT consisted of a test management, item bank, and authoring tool system. The results of the survey showed a high level of satisfaction in all system usability items except for stability. Further, the advantages of the e-learning system were ensuring information accessibility, providing constant feedback, and designing an intuitive interface. Necessary improvements to the system were stability, user control, readability, and diverse device usage. Based on the findings, suggestions for developing an e-learning system to improve usability by medical students and support learning effectively are recommended.

  5. Electronics. Criterion-Referenced Test (CRT) Item Bank.

    ERIC Educational Resources Information Center

    Davis, Diane, Ed.

    This document contains 519 criterion-referenced multiple choice and true or false test items for a course in electronics. The test item bank is designed to work with both the Vocational Instructional Management System (VIMS) and the Vocational Administrative Management System (VAMS) in Missouri. The items are grouped into 15 units covering the…

  6. Auto Mechanics. Criterion-Referenced Test (CRT) Item Bank.

    ERIC Educational Resources Information Center

    Tannehill, Dana, Ed.

    This document contains 546 criterion-referenced multiple choice and true or false test items for a course in auto mechanics. The test item bank is designed to work with both the Vocational Instructional Management System (VIMS) and Vocational Administrative Management System (VAMS) in Missouri. The items are grouped into 35 units covering the…

  7. NASA Advanced Life Support Technology Testing and Development

    NASA Technical Reports Server (NTRS)

    Wheeler, Raymond M.

    2012-01-01

    Prior to 2010, NASA's advanced life support research and development was carried out primarily under the Exploration Life Support Project of NASA's Exploration Systems Mission Directorate. In 2011, the Exploration Life Support Project was merged with other projects covering Fire Prevention/Suppression, Radiation Protection, Advanced Environmental Monitoring and Control, and Thermal Control Systems. This consolidated project was called Life Support and Habitation Systems, which was managed under the Exploration Systems Mission Directorate. In 2012, NASA re-organized major directorates within the agency, which eliminated the Exploration Systems Mission Directorate and created the Office of the Chief Technologist (OCT). Life support research and development is currently conducted within the Office of the Chief Technologist, under the Next Generation Life Support Project, and within the Human Exploration Operation Missions Directorate under several Advanced Exploration System projects. These Advanced Exploration Systems projects include various themes of life support technology testing, including atmospheric management, water management, logistics and waste management, and habitation systems. Food crop testing is currently conducted as part of the Deep Space Habitation (DSH) project within the Advanced Exploration Systems Program. This testing is focused on growing salad crops that could supplement the crew's diet during near term missions.

  8. Software control and system configuration management: A systems-wide approach

    NASA Technical Reports Server (NTRS)

    Petersen, K. L.; Flores, C., Jr.

    1984-01-01

    A comprehensive software control and system configuration management process for flight-crucial digital control systems of advanced aircraft has been developed and refined to insure efficient flight system development and safe flight operations. Because of the highly complex interactions among the hardware, software, and system elements of state-of-the-art digital flight control system designs, a systems-wide approach to configuration control and management has been used. Specific procedures are implemented to govern discrepancy reporting and reconciliation, software and hardware change control, systems verification and validation testing, and formal documentation requirements. An active and knowledgeable configuration control board reviews and approves all flight system configuration modifications and revalidation tests. This flexible process has proved effective during the development and flight testing of several research aircraft and remotely piloted research vehicles with digital flight control systems that ranged from relatively simple to highly complex, integrated mechanizations.

  9. The use of an automated flight test management system in the development of a rapid-prototyping flight research facility

    NASA Technical Reports Server (NTRS)

    Duke, Eugene L.; Hewett, Marle D.; Brumbaugh, Randal W.; Tartt, David M.; Antoniewicz, Robert F.; Agarwal, Arvind K.

    1988-01-01

    An automated flight test management system (ATMS) and its use to develop a rapid-prototyping flight research facility for artificial intelligence (AI) based flight systems concepts are described. The ATMS provides a flight test engineer with a set of tools that assist in flight planning and simulation. This system will be capable of controlling an aircraft during the flight test by performing closed-loop guidance functions, range management, and maneuver-quality monitoring. The rapid-prototyping flight research facility is being developed at the Dryden Flight Research Facility of the NASA Ames Research Center (Ames-Dryden) to provide early flight assessment of emerging AI technology. The facility is being developed as one element of the aircraft automation program which focuses on the qualification and validation of embedded real-time AI-based systems.

  10. Design and utilization of a Flight Test Engineering Database Management System at the NASA Dryden Flight Research Facility

    NASA Technical Reports Server (NTRS)

    Knighton, Donna L.

    1992-01-01

    A Flight Test Engineering Database Management System (FTE DBMS) was designed and implemented at the NASA Dryden Flight Research Facility. The X-29 Forward Swept Wing Advanced Technology Demonstrator flight research program was chosen for the initial system development and implementation. The FTE DBMS greatly assisted in planning and 'mass production' card preparation for an accelerated X-29 research program. Improved Test Plan tracking and maneuver management for a high flight-rate program were proven, and flight rates of up to three flights per day, two times per week were maintained.

  11. The Careful Puppet Master: Reducing risk and fortifying acceptance testing with Jenkins CI

    NASA Astrophysics Data System (ADS)

    Smith, Jason A.; Richman, Gabriel; DeStefano, John; Pryor, James; Rao, Tejas; Strecker-Kellogg, William; Wong, Tony

    2015-12-01

    Centralized configuration management, including the use of automation tools such as Puppet, can greatly increase provisioning speed and efficiency when configuring new systems or making changes to existing systems, reduce duplication of work, and improve automated processes. However, centralized management also brings with it a level of inherent risk: a single change in just one file can quickly be pushed out to thousands of computers and, if that change is not properly and thoroughly tested and contains an error, could result in catastrophic damage to many services, potentially bringing an entire computer facility offline. Change management procedures can—and should—be formalized in order to prevent such accidents. However, like the configuration management process itself, if such procedures are not automated, they can be difficult to enforce strictly. Therefore, to reduce the risk of merging potentially harmful changes into our production Puppet environment, we have created an automated testing system, which includes the Jenkins CI tool, to manage our Puppet testing process. This system includes the proposed changes and runs Puppet on a pool of dozens of RedHat Enterprise Virtualization (RHEV) virtual machines (VMs) that replicate most of our important production services for the purpose of testing. This paper describes our automated test system and how it hooks into our production approval process for automatic acceptance testing. All pending changes that have been pushed to production must pass this validation process before they can be approved and merged into production.

  12. Software control and system configuration management - A process that works

    NASA Technical Reports Server (NTRS)

    Petersen, K. L.; Flores, C., Jr.

    1983-01-01

    A comprehensive software control and system configuration management process for flight-crucial digital control systems of advanced aircraft has been developed and refined to insure efficient flight system development and safe flight operations. Because of the highly complex interactions among the hardware, software, and system elements of state-of-the-art digital flight control system designs, a systems-wide approach to configuration control and management has been used. Specific procedures are implemented to govern discrepancy reporting and reconciliation, software and hardware change control, systems verification and validation testing, and formal documentation requirements. An active and knowledgeable configuration control board reviews and approves all flight system configuration modifications and revalidation tests. This flexible process has proved effective during the development and flight testing of several research aircraft and remotely piloted research vehicles with digital flight control systems that ranged from relatively simple to highly complex, integrated mechanizations.

  13. Managing laboratory test ordering through test frequency filtering.

    PubMed

    Janssens, Pim M W; Wasser, Gerd

    2013-06-01

    Modern computer systems allow limits to be set on the periods allowed for repetitive testing. We investigated a computerised system for managing potentially overtly frequent laboratory testing, calculating the financial savings obtained. In consultation with hospital physicians, tests were selected for which 'spare periods' (periods during which tests are barred) might be set to control repetitive testing. The tests were selected and spare periods determined based on known analyte variations in health and disease, variety of tissues or cells giving rise to analytes, clinical conditions and rate of change determining analyte levels, frequency with which doctors need information about the analytes and the logistical needs of the clinic. The operation and acceptance of the system was explored with 23 analytes. Frequency filtering was subsequently introduced for 44 tests, each with their own spare periods. The proportion of tests barred was 0.56%, the most frequent of these being for total cholesterol, uric acid and HDL-cholesterol. The financial savings were 0.33% of the costs of all testing, with HbA1c, HDL-cholesterol and vitamin B12 yielding the largest savings. Following the introduction of the system the number of barred tests ultimately decreased, suggesting accommodation by the test requestors. Managing laboratory testing through computerised limits to prevent overtly frequent testing is feasible. The savings were relatively low, but sustaining the system takes little effort, giving little reason not to apply it. The findings will serve as a basis for improving the system and may guide others in introducing similar systems.

  14. The development of an automated flight test management system for flight test planning and monitoring

    NASA Technical Reports Server (NTRS)

    Hewett, Marle D.; Tartt, David M.; Duke, Eugene L.; Antoniewicz, Robert F.; Brumbaugh, Randal W.

    1988-01-01

    The development of an automated flight test management system (ATMS) as a component of a rapid-prototyping flight research facility for AI-based flight systems concepts is described. The rapid-prototyping facility includes real-time high-fidelity simulators, numeric and symbolic processors, and high-performance research aircraft modified to accept commands for a ground-based remotely augmented vehicle facility. The flight system configuration of the ATMS includes three computers: the TI explorer LX and two GOULD SEL 32/27s.

  15. Integrated corridor management initiative : demonstration phase evaluation - Dallas decision support system analysis test plan.

    DOT National Transportation Integrated Search

    2012-08-01

    This report presents the test plan for conducting the Decision Support System (DSS) Analysis for the United States Department of Transportation (U.S. DOT) evaluation of the Dallas U.S. 75 Integrated Corridor Management (ICM) Initiative Demonstration....

  16. Modeling and Simulation in Support of Testing and Evaluation

    DTIC Science & Technology

    1997-03-01

    contains standardized automated test methodology, synthetic stimuli and environments based on TECOM Ground Truth data and physics . The VPG is a distributed...Systems Acquisition Management (FSAM) coursebook , Defense Systems Management College, January 1994. Crocker, Charles M. “Application of the Simulation

  17. TRENDS: The aeronautical post-test database management system

    NASA Technical Reports Server (NTRS)

    Bjorkman, W. S.; Bondi, M. J.

    1990-01-01

    TRENDS, an engineering-test database operating system developed by NASA to support rotorcraft flight tests, is described. Capabilities and characteristics of the system are presented, with examples of its use in recalling and analyzing rotorcraft flight-test data from a TRENDS database. The importance of system user-friendliness in gaining users' acceptance is stressed, as is the importance of integrating supporting narrative data with numerical data in engineering-test databases. Considerations relevant to the creation and maintenance of flight-test database are discussed and TRENDS' solutions to database management problems are described. Requirements, constraints, and other considerations which led to the system's configuration are discussed and some of the lessons learned during TRENDS' development are presented. Potential applications of TRENDS to a wide range of aeronautical and other engineering tests are identified.

  18. The development of a Flight Test Engineer's Workstation for the Automated Flight Test Management System

    NASA Technical Reports Server (NTRS)

    Tartt, David M.; Hewett, Marle D.; Duke, Eugene L.; Cooper, James A.; Brumbaugh, Randal W.

    1989-01-01

    The Automated Flight Test Management System (ATMS) is being developed as part of the NASA Aircraft Automation Program. This program focuses on the application of interdisciplinary state-of-the-art technology in artificial intelligence, control theory, and systems methodology to problems of operating and flight testing high-performance aircraft. The development of a Flight Test Engineer's Workstation (FTEWS) is presented, with a detailed description of the system, technical details, and future planned developments. The goal of the FTEWS is to provide flight test engineers and project officers with an automated computer environment for planning, scheduling, and performing flight test programs. The FTEWS system is an outgrowth of the development of ATMS and is an implementation of a component of ATMS on SUN workstations.

  19. Results of data base management system parameterized performance testing related to GSFC scientific applications

    NASA Technical Reports Server (NTRS)

    Carchedi, C. H.; Gough, T. L.; Huston, H. A.

    1983-01-01

    The results of a variety of tests designed to demonstrate and evaluate the performance of several commercially available data base management system (DBMS) products compatible with the Digital Equipment Corporation VAX 11/780 computer system are summarized. The tests were performed on the INGRES, ORACLE, and SEED DBMS products employing applications that were similar to scientific applications under development by NASA. The objectives of this testing included determining the strength and weaknesses of the candidate systems, performance trade-offs of various design alternatives and the impact of some installation and environmental (computer related) influences.

  20. Plan for the Characterization of HIRF Effects on a Fault-Tolerant Computer Communication System

    NASA Technical Reports Server (NTRS)

    Torres-Pomales, Wilfredo; Malekpour, Mahyar R.; Miner, Paul S.; Koppen, Sandra V.

    2008-01-01

    This report presents the plan for the characterization of the effects of high intensity radiated fields on a prototype implementation of a fault-tolerant data communication system. Various configurations of the communication system will be tested. The prototype system is implemented using off-the-shelf devices. The system will be tested in a closed-loop configuration with extensive real-time monitoring. This test is intended to generate data suitable for the design of avionics health management systems, as well as redundancy management mechanisms and policies for robust distributed processing architectures.

  1. Program Manager: Journal of the Defense Systems Management College. Volume 18, Number 3, May-June 1989

    DTIC Science & Technology

    1989-06-01

    Measurable goals and milestones are supported by action plans which include underlying assumptions, allocation of respon- sibility, resource ...military reasons developments to the relationship be- vironmental laws? for starting where he did. To tween hardware and the environment. Responsibility...supporting integrated testing understanding of the concerns of the - Managing test resources military services and which would set - Evaluating system

  2. Magnetohydrodynamics (MHD) Engineering Test Facility (ETF) 200 MWe power plant Conceptual Design Engineering Report (CDER)

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The reference conceptual design of the magnetohydrodynamic (MHD) Engineering Test Facility (ETF), a prototype 200 MWe coal-fired electric generating plant designed to demonstrate the commercial feasibility of open cycle MHD, is summarized. Main elements of the design, systems, and plant facilities are illustrated. System design descriptions are included for closed cycle cooling water, industrial gas systems, fuel oil, boiler flue gas, coal management, seed management, slag management, plant industrial waste, fire service water, oxidant supply, MHD power ventilating

  3. Magnetohydrodynamics (MHD) Engineering Test Facility (ETF) 200 MWe power plant Conceptual Design Engineering Report (CDER)

    NASA Astrophysics Data System (ADS)

    1981-09-01

    The reference conceptual design of the magnetohydrodynamic (MHD) Engineering Test Facility (ETF), a prototype 200 MWe coal-fired electric generating plant designed to demonstrate the commercial feasibility of open cycle MHD, is summarized. Main elements of the design, systems, and plant facilities are illustrated. System design descriptions are included for closed cycle cooling water, industrial gas systems, fuel oil, boiler flue gas, coal management, seed management, slag management, plant industrial waste, fire service water, oxidant supply, MHD power ventilating

  4. Methodology. Volume 3

    DTIC Science & Technology

    1997-02-01

    modification, test, and production System operation, support, and maturation Weapon System Life Cycle Management Weapon systems Attainment...information management systems • Weapon systems electronics context – Focuses on many types of interactions » Information » Jamming » Support – Deals with...concepts • C4I context – Focuses on C4I information management systems – Defines the C4I systems and their information interchange requirements

  5. NASA UAS Traffic Management National Campaign Operations across Six UAS Test Sites

    NASA Technical Reports Server (NTRS)

    Rios, Joseph; Mulfinger, Daniel; Homola, Jeff; Venkatesan, Priya

    2016-01-01

    NASA's Unmanned Aircraft Systems Traffic Management research aims to develop policies, procedures, requirements, and other artifacts to inform the implementation of a future system that enables small drones to access the low altitude airspace. In this endeavor, NASA conducted a geographically diverse flight test in conjunction with the FAA's six unmanned aircraft systems Test Sites. A control center at NASA Ames Research Center autonomously managed the airspace for all participants in eight states as they flew operations (both real and simulated). The system allowed for common situational awareness across all stakeholders, kept traffic procedurally separated, offered messages to inform the participants of activity relevant to their operations. Over the 3- hour test, 102 flight operations connected to the central research platform with 17 different vehicle types and 8 distinct software client implementations while seamlessly interacting with simulated traffic.

  6. Development and application of an acceptance testing model

    NASA Technical Reports Server (NTRS)

    Pendley, Rex D.; Noonan, Caroline H.; Hall, Kenneth R.

    1992-01-01

    The process of acceptance testing large software systems for NASA has been analyzed, and an empirical planning model of the process constructed. This model gives managers accurate predictions of the staffing needed, the productivity of a test team, and the rate at which the system will pass. Applying the model to a new system shows a high level of agreement between the model and actual performance. The model also gives managers an objective measure of process improvement.

  7. Mission Control Center (MCC) System Specification for the Shuttle Orbital Flight Test (OFT) Timeframe

    NASA Technical Reports Server (NTRS)

    1976-01-01

    System specifications to be used by the mission control center (MCC) for the shuttle orbital flight test (OFT) time frame were described. The three support systems discussed are the communication interface system (CIS), the data computation complex (DCC), and the display and control system (DCS), all of which may interfere with, and share processing facilities with other applications processing supporting current MCC programs. The MCC shall provide centralized control of the space shuttle OFT from launch through orbital flight, entry, and landing until the Orbiter comes to a stop on the runway. This control shall include the functions of vehicle management in the area of hardware configuration (verification), flight planning, communication and instrumentation configuration management, trajectory, software and consumables, payloads management, flight safety, and verification of test conditions/environment.

  8. A rigorous approach to facilitate and guarantee the correctness of the genetic testing management in human genome information systems.

    PubMed

    Araújo, Luciano V; Malkowski, Simon; Braghetto, Kelly R; Passos-Bueno, Maria R; Zatz, Mayana; Pu, Calton; Ferreira, João E

    2011-12-22

    Recent medical and biological technology advances have stimulated the development of new testing systems that have been providing huge, varied amounts of molecular and clinical data. Growing data volumes pose significant challenges for information processing systems in research centers. Additionally, the routines of genomics laboratory are typically characterized by high parallelism in testing and constant procedure changes. This paper describes a formal approach to address this challenge through the implementation of a genetic testing management system applied to human genome laboratory. We introduced the Human Genome Research Center Information System (CEGH) in Brazil, a system that is able to support constant changes in human genome testing and can provide patients updated results based on the most recent and validated genetic knowledge. Our approach uses a common repository for process planning to ensure reusability, specification, instantiation, monitoring, and execution of processes, which are defined using a relational database and rigorous control flow specifications based on process algebra (ACP). The main difference between our approach and related works is that we were able to join two important aspects: 1) process scalability achieved through relational database implementation, and 2) correctness of processes using process algebra. Furthermore, the software allows end users to define genetic testing without requiring any knowledge about business process notation or process algebra. This paper presents the CEGH information system that is a Laboratory Information Management System (LIMS) based on a formal framework to support genetic testing management for Mendelian disorder studies. We have proved the feasibility and showed usability benefits of a rigorous approach that is able to specify, validate, and perform genetic testing using easy end user interfaces.

  9. A rigorous approach to facilitate and guarantee the correctness of the genetic testing management in human genome information systems

    PubMed Central

    2011-01-01

    Background Recent medical and biological technology advances have stimulated the development of new testing systems that have been providing huge, varied amounts of molecular and clinical data. Growing data volumes pose significant challenges for information processing systems in research centers. Additionally, the routines of genomics laboratory are typically characterized by high parallelism in testing and constant procedure changes. Results This paper describes a formal approach to address this challenge through the implementation of a genetic testing management system applied to human genome laboratory. We introduced the Human Genome Research Center Information System (CEGH) in Brazil, a system that is able to support constant changes in human genome testing and can provide patients updated results based on the most recent and validated genetic knowledge. Our approach uses a common repository for process planning to ensure reusability, specification, instantiation, monitoring, and execution of processes, which are defined using a relational database and rigorous control flow specifications based on process algebra (ACP). The main difference between our approach and related works is that we were able to join two important aspects: 1) process scalability achieved through relational database implementation, and 2) correctness of processes using process algebra. Furthermore, the software allows end users to define genetic testing without requiring any knowledge about business process notation or process algebra. Conclusions This paper presents the CEGH information system that is a Laboratory Information Management System (LIMS) based on a formal framework to support genetic testing management for Mendelian disorder studies. We have proved the feasibility and showed usability benefits of a rigorous approach that is able to specify, validate, and perform genetic testing using easy end user interfaces. PMID:22369688

  10. SSE software test management STM capability: Using STM in the Ground Systems Development Environment (GSDE)

    NASA Technical Reports Server (NTRS)

    Church, Victor E.; Long, D.; Hartenstein, Ray; Perez-Davila, Alfredo

    1992-01-01

    This report is one of a series discussing configuration management (CM) topics for Space Station ground systems software development. It provides a description of the Software Support Environment (SSE)-developed Software Test Management (STM) capability, and discusses the possible use of this capability for management of developed software during testing performed on target platforms. This is intended to supplement the formal documentation of STM provided by the SEE Project. How STM can be used to integrate contractor CM and formal CM for software before delivery to operations is described. STM provides a level of control that is flexible enough to support integration and debugging, but sufficiently rigorous to insure the integrity of the testing process.

  11. Efficient Evaluation System for Learning Management Systems

    ERIC Educational Resources Information Center

    Cavus, Nadire

    2009-01-01

    A learning management system (LMS) provides the platform for web-based learning environment by enabling the management, delivery, tracking of learning, testing, communication, registration process and scheduling. There are many LMS systems on the market that can be obtained for free or through payment. It has now become an important task to choose…

  12. Configuration management issues and objectives for a real-time research flight test support facility

    NASA Technical Reports Server (NTRS)

    Yergensen, Stephen; Rhea, Donald C.

    1988-01-01

    Presented are some of the critical issues and objectives pertaining to configuration management for the NASA Western Aeronautical Test Range (WATR) of Ames Research Center. The primary mission of the WATR is to provide a capability for the conduct of aeronautical research flight test through real-time processing and display, tracking, and communications systems. In providing this capability, the WATR must maintain and enforce a configuration management plan which is independent of, but complimentary to, various research flight test project configuration management systems. A primary WATR objective is the continued development of generic research flight test project support capability, wherein the reliability of WATR support provided to all project users is a constant priority. Therefore, the processing of configuration change requests for specific research flight test project requirements must be evaluated within a perspective that maintains this primary objective.

  13. 46 CFR 162.060-32 - Testing and evaluation requirements for active substances, preparations, and relevant chemicals.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... substances, preparations, and relevant chemicals. 162.060-32 Section 162.060-32 Shipping COAST GUARD... APPROVAL ENGINEERING EQUIPMENT Ballast Water Management Systems § 162.060-32 Testing and evaluation requirements for active substances, preparations, and relevant chemicals. (a) A ballast water management system...

  14. 46 CFR 162.060-32 - Testing and evaluation requirements for active substances, preparations, and relevant chemicals.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... substances, preparations, and relevant chemicals. 162.060-32 Section 162.060-32 Shipping COAST GUARD... APPROVAL ENGINEERING EQUIPMENT Ballast Water Management Systems § 162.060-32 Testing and evaluation requirements for active substances, preparations, and relevant chemicals. (a) A ballast water management system...

  15. 46 CFR 162.060-32 - Testing and evaluation requirements for active substances, preparations, and relevant chemicals.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... substances, preparations, and relevant chemicals. 162.060-32 Section 162.060-32 Shipping COAST GUARD... APPROVAL ENGINEERING EQUIPMENT Ballast Water Management Systems § 162.060-32 Testing and evaluation requirements for active substances, preparations, and relevant chemicals. (a) A ballast water management system...

  16. Criterion-Referenced Test (CRT) Items for Air Conditioning, Heating and Refrigeration.

    ERIC Educational Resources Information Center

    Davis, Diane, Ed.

    These criterion-referenced test (CRT) items for air conditioning, heating, and refrigeration are keyed to the Missouri Air Conditioning, Heating, and Refrigeration Competency Profile. The items are designed to work with both the Vocational Instructional Management System and Vocational Administrative Management System. For word processing and…

  17. 41 CFR 101-25.101-2 - Supply through storage and issue.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 25-GENERAL 25.1... close inspection or testing is necessary to secure quality, or where repetitive inspection and test of... distribution system does not exist to assure availability at use point. (6) Where volume purchases are...

  18. 41 CFR 101-25.101-2 - Supply through storage and issue.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 25-GENERAL 25.1... close inspection or testing is necessary to secure quality, or where repetitive inspection and test of... distribution system does not exist to assure availability at use point. (6) Where volume purchases are...

  19. Quality management and accreditation in a mixed research and clinical hair testing analytical laboratory setting-a review.

    PubMed

    Fulga, Netta

    2013-06-01

    Quality management and accreditation in the analytical laboratory setting are developing rapidly and becoming the standard worldwide. Quality management refers to all the activities used by organizations to ensure product or service consistency. Accreditation is a formal recognition by an authoritative regulatory body that a laboratory is competent to perform examinations and report results. The Motherisk Drug Testing Laboratory is licensed to operate at the Hospital for Sick Children in Toronto, Ontario. The laboratory performs toxicology tests of hair and meconium samples for research and clinical purposes. Most of the samples are involved in a chain of custody cases. Establishing a quality management system and achieving accreditation became mandatory by legislation for all Ontario clinical laboratories since 2003. The Ontario Laboratory Accreditation program is based on International Organization for Standardization 15189-Medical laboratories-Particular requirements for quality and competence, an international standard that has been adopted as a national standard in Canada. The implementation of a quality management system involves management commitment, planning and staff education, documentation of the system, validation of processes, and assessment against the requirements. The maintenance of a quality management system requires control and monitoring of the entire laboratory path of workflow. The process of transformation of a research/clinical laboratory into an accredited laboratory, and the benefits of maintaining an effective quality management system, are presented in this article.

  20. Randomized controlled trial of supervised patient self-testing of warfarin therapy using an internet-based expert system.

    PubMed

    Ryan, F; Byrne, S; O'Shea, S

    2009-08-01

    Increased frequency of prothrombin time testing, facilitated by patient self-testing (PST) of the International Normalized Ratio (INR) can improve the clinical outcomes of oral anticoagulation therapy (OAT). However, oversight of this type of management is often difficult and time-consuming for healthcare professionals. This study reports the first randomized controlled trial of an automated direct-to-patient expert system, enabling remote and effective management of patients on OAT. A prospective, randomized controlled cross-over study was performed to test the hypothesis that supervised PST using an internet-based, direct-to-patient expert system could provide improved anticoagulation control as compared with that provided by an anticoagulation management service (AMS). During the 6 months of supervised PST, patients measured their INR at home using a portable meter and entered this result, along with other information, onto the internet web page. Patients received instant feedback from the system as to what dose to take and when the next test was due. During the routine care arm, patients attended the AMS at least every 4-6 weeks and were dosed by the anticoagulation pharmacist or physician. The primary outcome variable was the difference in the time in therapeutic range (TTR) between both arms. One hundred and sixty-two patients were enrolled (male 61.6%, mean age 58.7 years), and 132 patients (81.5%) completed both arms. TTR was significantly higher during PST management than during AMS management (median TTR 74% vs 58.6%; z=5.67, P < 0.001). The use of an internet-based, direct-to-patient expert system for the management of PST improves the control of OAT as compared with AMS management.

  1. Program Manager: Journal of the Defense Systems Management College. Volume 16, Number 3, May-June 1987

    DTIC Science & Technology

    1987-06-01

    redress a growingstrategic imbalance and provide an en- test pilots conducted a rigorous flight test during capability to penetrate Soviet program...ment career path for rated officers vidual rotates through assignments in ( pilots and navigators) is different from engineering, test and evaluation...pain. Acquiring the B-1B, or any other weapon system for that matter, entails developing, testing ard producing new technology. In any high-tech en

  2. 78 FR 78275 - Alcohol and Drug Testing: Determination of Minimum Random Testing Rates for 2014

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-26

    ... to data from FRA's Management Information System, the rail industry's random drug testing positive... December 26, 2013. FOR FURTHER INFORMATION CONTACT: Jerry Powers, FRA Drug and Alcohol Program Manager, W38...

  3. Information management system study results. Volume 2: IMS study results appendixes

    NASA Technical Reports Server (NTRS)

    1971-01-01

    Computer systems program specifications are presented for the modular space station information management system. These are the computer program contract end item, data bus system, data bus breadboard, and display interface adapter specifications. The performance, design, tests, and qualification requirements are established for the implementation of the information management system. For Vol. 1, see N72-19972.

  4. Harnessing Technology for School Accountability: A Case Study of Implementing a Management Information System

    ERIC Educational Resources Information Center

    Enomoto, Ernestine K.; Conley, Sharon

    2007-01-01

    Schools employ educational technology to comply with pressures for greater accountability and efficiency in conducting operations. Specifically, schools use "management information systems" designed to automate data collection of student attendance, grades, test scores, and so on. These management information systems (MIS) employed…

  5. Space Transportation System Cargo projects: inertial stage/spacecraft integration plan. Volume 1: Management plan

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The Kennedy Space Center (KSC) Management System for the Inertial Upper Stage (IUS) - spacecraft processing from KSC arrival through launch is described. The roles and responsibilities of the agencies and test team organizations involved in IUS-S/C processing at KSC for non-Department of Defense missions are described. Working relationships are defined with respect to documentation preparation, coordination and approval, schedule development and maintenance, test conduct and control, configuration management, quality control and safety. The policy regarding the use of spacecraft contractor test procedures, IUS contractor detailed operating procedures and KSC operations and maintenance instructions is defined. Review and approval requirements for each documentation system are described.

  6. The Space Station Module Power Management and Distribution automation test bed

    NASA Technical Reports Server (NTRS)

    Lollar, Louis F.

    1991-01-01

    The Space Station Module Power Management And Distribution (SSM/PMAD) automation test bed project was begun at NASA/Marshall Space Flight Center (MSFC) in the mid-1980s to develop an autonomous, user-supportive power management and distribution test bed simulating the Space Station Freedom Hab/Lab modules. As the test bed has matured, many new technologies and projects have been added. The author focuses on three primary areas. The first area is the overall accomplishments of the test bed itself. These include a much-improved user interface, a more efficient expert system scheduler, improved communication among the three expert systems, and initial work on adding intermediate levels of autonomy. The second area is the addition of a more realistic power source to the SSM/PMAD test bed; this project is called the Large Autonomous Spacecraft Electrical Power System (LASEPS). The third area is the completion of a virtual link between the SSM/PMAD test bed at MSFC and the Autonomous Power Expert at Lewis Research Center.

  7. 17 CFR 39.36 - Risk management for systemically important derivatives clearing organizations and subpart C...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ...) Establish procedures for: (i) Reporting stress test results to its risk management committee or board of... 17 Commodity and Securities Exchanges 1 2014-04-01 2014-04-01 false Risk management for....36 Risk management for systemically important derivatives clearing organizations and subpart C...

  8. Applications for improved inventory management for public transit systems

    DOT National Transportation Integrated Search

    2001-01-01

    This report documents and presents the results of a Testing and Demonstration (T&D) Project on applications for improved inventory management for public transit systems. This project is a follow-up to an earlier study on inventory management for bus ...

  9. Electronic Toll And Traffic Management Systems, National Cooperative Highway Research Program Synthesis

    DOT National Transportation Integrated Search

    1993-01-01

    ELECTRONIC TOLL COLLECTION OR ETC AND TRAFFIC MANAGEMENT OR ETTM, AUTOMATIC VEHICLE IDENTIFICATION OR AVI : ELECTRONIC TOLL COLLECTION AND TRAFFIC MANAGEMENT (ETTM) SYSTEMS ARE NOT A FUTURISTIC DREAM, THEY ARE OPERATING OR ARE BEING TESTED TODAY I...

  10. Redundancy management of electrohydraulic servoactuators by mathematical model referencing

    NASA Technical Reports Server (NTRS)

    Campbell, R. A.

    1971-01-01

    A description of a mathematical model reference system is presented which provides redundancy management for an electrohydraulic servoactuator. The mathematical model includes a compensation network that calculates reference parameter perturbations induced by external disturbance forces. This is accomplished by using the measured pressure differential data taken from the physical system. This technique was experimentally verified by tests performed using the H-1 engine thrust vector control system for Saturn IB. The results of these tests are included in this report. It was concluded that this technique improves the tracking accuracy of the model reference system to the extent that redundancy management of electrohydraulic servosystems may be performed using this method.

  11. Data management system DIU test system

    NASA Technical Reports Server (NTRS)

    1976-01-01

    An operational and functional description is given of the data management system. Descriptions are included for the test control unit, analog stimulus panel, discrete stimulus panel, and the precision source. The mechanical configuration is defined and illustrated to provide card and component location for modification or repair. The unit level interfaces are mirror images of the DIU interfaces and are described in the Final Technical Report for NASA-MSFC contract NAS8-29155.

  12. Global Hawk Systems Engineering. Case Study

    DTIC Science & Technology

    2010-01-01

    Management Core System ( TBMCS ) (complex software development) • F-111 Fighter (joint program with significant involvement by the Office of the...Software Requirements Specification TACC Tailored Airworthiness Certification Criteria TBMCS Theater Battle Management Core System TEMP Test and

  13. NASA Stennis Space Center integrated system health management test bed and development capabilities

    NASA Astrophysics Data System (ADS)

    Figueroa, Fernando; Holland, Randy; Coote, David

    2006-05-01

    Integrated System Health Management (ISHM) capability for rocket propulsion testing is rapidly evolving and promises substantial reduction in time and cost of propulsion systems development, with substantially reduced operational costs and evolutionary improvements in launch system operational robustness. NASA Stennis Space Center (SSC), along with partners that includes NASA, contractor, and academia; is investigating and developing technologies to enable ISHM capability in SSC's rocket engine test stands (RETS). This will enable validation and experience capture over a broad range of rocket propulsion systems of varying complexity. This paper describes key components that constitute necessary ingredients to make possible implementation of credible ISHM capability in RETS, other NASA ground test and operations facilities, and ultimately spacecraft and space platforms and systems: (1) core technologies for ISHM, (2) RETS as ISHM testbeds, and (3) RETS systems models.

  14. Incident management under SCAT adaptive control system : FAST-TRAC phase III deliverable. #11, Final report on incident management under SCATS adaptive control system

    DOT National Transportation Integrated Search

    1998-04-01

    The report documents the results of a study designed to test the effectiveness of ATMS and ATIS strategies to reduce delay resulting from an incident. The study had two main sections: a simulation study to test the effectiveness of several control st...

  15. ENVIRONMENTAL TECHNOLOGY VERIFICATION REPORT: STORMWATER SOURCE AREA TREATMENT DEVICE; PRACTICAL BEST MANAGEMENT OF GEORGIA, INC., CRYSTALSTREAM� WATER QUALITY VAULT MODEL 1056

    EPA Science Inventory

    Verification testing of the Practical Best Management, Inc., CrystalStream™ stormwater treatment system was conducted over a 15-month period starting in March, 2003. The system was installed in a test site in Griffin, Georgia, and served a drainage basin of approximately 4 ...

  16. Methods and Systems for Advanced Spaceport Information Management

    NASA Technical Reports Server (NTRS)

    Fussell, Ronald M. (Inventor); Ely, Donald W. (Inventor); Meier, Gary M. (Inventor); Halpin, Paul C. (Inventor); Meade, Phillip T. (Inventor); Jacobson, Craig A. (Inventor); Blackwell-Thompson, Charlie (Inventor)

    2007-01-01

    Advanced spaceport information management methods and systems are disclosed. In one embodiment, a method includes coupling a test system to the payload and transmitting one or more test signals that emulate an anticipated condition from the test system to the payload. One or more responsive signals are received from the payload into the test system and are analyzed to determine whether one or more of the responsive signals comprises an anomalous signal. At least one of the steps of transmitting, receiving, analyzing and determining includes transmitting at least one of the test signals and the responsive signals via a communications link from a payload processing facility to a remotely located facility. In one particular embodiment, the communications link is an Internet link from a payload processing facility to a remotely located facility (e.g. a launch facility, university, etc.).

  17. Methods and systems for advanced spaceport information management

    NASA Technical Reports Server (NTRS)

    Ely, Donald W. (Inventor); Fussell, Ronald M. (Inventor); Halpin, Paul C. (Inventor); Blackwell-Thompson, Charlie (Inventor); Meier, Gary M. (Inventor); Meade, Phillip T. (Inventor); Jacobson, Craig A. (Inventor)

    2007-01-01

    Advanced spaceport information management methods and systems are disclosed. In one embodiment, a method includes coupling a test system to the payload and transmitting one or more test signals that emulate an anticipated condition from the test system to the payload. One or more responsive signals are received from the payload into the test system and are analyzed to determine whether one or more of the responsive signals comprises an anomalous signal. At least one of the steps of transmitting, receiving, analyzing and determining includes transmitting at least one of the test signals and the responsive signals via a communications link from a payload processing facility to a remotely located facility. In one particular embodiment, the communications link is an Internet link from a payload processing facility to a remotely located facility (e.g. a launch facility, university, etc.).

  18. Project management techniques for highly integrated programs

    NASA Technical Reports Server (NTRS)

    Stewart, J. F.; Bauer, C. A.

    1983-01-01

    The management and control of a representative, highly integrated high-technology project, in the X-29A aircraft flight test project is addressed. The X-29A research aircraft required the development and integration of eight distinct technologies in one aircraft. The project management system developed for the X-29A flight test program focuses on the dynamic interactions and the the intercommunication among components of the system. The insights gained from the new conceptual framework permitted subordination of departments to more functional units of decisionmaking, information processing, and communication networks. These processes were used to develop a project management system for the X-29A around the information flows that minimized the effects inherent in sampled-data systems and exploited the closed-loop multivariable nature of highly integrated projects.

  19. A whole process quality control system for energy measuring instruments inspection based on IOT technology

    NASA Astrophysics Data System (ADS)

    Yin, Bo; Liu, Li; Wang, Jiahan; Li, Xiran; Liu, Zhenbo; Li, Dewei; Wang, Jun; Liu, Lu; Wu, Jun; Xu, Tingting; Cui, He

    2017-10-01

    Electric energy measurement as a basic work, an accurate measurements play a vital role for the economic interests of both parties of power supply, the standardized management of the measurement laboratory at all levels is a direct factor that directly affects the fairness of measurement. Currently, the management of metering laboratories generally uses one-dimensional bar code as the recognition object, advances the testing process by manual management, most of the test data requires human input to generate reports. There are many problems and potential risks in this process: Data cannot be saved completely, cannot trace the status of inspection, the inspection process isn't completely controllable and so on. For the provincial metrology center's actual requirements of the whole process management for the performance test of the power measuring appliances, using of large-capacity RF tags as a process management information media, we developed a set of general measurement experiment management system, formulated a standardized full performance test process, improved the raw data recording mode of experimental process, developed a storehouse automatic inventory device, established a strict test sample transfer and storage system, ensured that all the raw data of the inspection can be traced back, achieved full life-cycle control of the sample, significantly improved the quality control level and the effectiveness of inspection work.

  20. Performance Results for a Universal Lithium Ion Battery Management System

    DTIC Science & Technology

    2012-08-01

    MODELING & SIMULATION, TESTING AND VALIDATION (MSTV) MINI-SYMPOSIUM AUGUST 14-16, MICHIGAN PERFORMANCE RESULTS FOR A UNIVERSAL LITHIUM ION BATTERY MANAGEMENT...Article 3. DATES COVERED 12-08-2012 to 12-08-2012 4. TITLE AND SUBTITLE PERFORMANCE RESULTS FOR A UNIVERSAL LITHIUM ION BATTERY MANAGEMENT SYSTEM...Engineering and Technology Symposium (GVSETS) Performance Results for a Universal Lithium Ion Battery Management System UNCLASSIFIED – Page 2 of 11

  1. 40 CFR 272.751 - Indiana state-administered program: Final authorization.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... Hazardous Waste Management System; Testing and Monitoring Activities (Checklist 158) 62 FR 32452 June 13... Management System; Carbamate Production, Identification and Listing of Hazardous Waste; Land Disposal... Indiana Department of Environmental Management, signed by the Commissioner of the IDEM on February 14...

  2. An approach to operating system testing

    NASA Technical Reports Server (NTRS)

    Sum, R. N., Jr.; Campbell, R. H.; Kubitz, W. J.

    1984-01-01

    To ensure the reliability and performance of a new system, it must be verified or validated in some manner. Currently, testing is the only resonable technique available for doing this. Part of this testing process is the high level system test. System testing is considered with respect to operating systems and in particular UNIX. This consideration results in the development and presentation of a good method for performing the system test. The method includes derivations from the system specifications and ideas for management of the system testing project. Results of applying the method to the IBM System/9000 XENIX operating system test and the development of a UNIX test suite are presented.

  3. A Cost Prediction Model for Electronic Systems Flight Test Costs.

    DTIC Science & Technology

    1983-09-01

    development. It was found that a significant cost estimating relationship (CER) exists between costs and the characteristics of the flight test design. Using...University In Partial Fulfillment of the Requirements for the Degree of Master of Science in Systems Management By C ., Thomas 3. DuPre’, BS Accession...SYSTEMS MANAGEMENT DATE: 28 September 1983 COMMITTEE CHA. ICEAfER it TABLE OF CONTENTS Page LIST OF TABLES ......................... vi LIST OF FIGURES

  4. NEXT Propellant Management System Integration With Multiple Ion Thrusters

    NASA Technical Reports Server (NTRS)

    Sovey, James S.; Soulas, George C.; Herman, Daniel A.

    2011-01-01

    As a critical part of the NEXT test validation process, a multiple-string integration test was performed on the NEXT propellant management system and ion thrusters. The objectives of this test were to verify that the PMS is capable of providing stable flow control to multiple thrusters operating over the NEXT system throttling range and to demonstrate to potential users that the NEXT PMS is ready for transition to flight. A test plan was developed for the sub-system integration test for verification of PMS and thruster system performance and functionality requirements. Propellant management system calibrations were checked during the single and multi-thruster testing. The low pressure assembly total flow rates to the thruster(s) were within 1.4 percent of the calibrated support equipment flow rates. The inlet pressures to the main, cathode, and neutralizer ports of Thruster PM1R were measured as the PMS operated in 1-thruster, 2-thruster, and 3-thruster configurations. It was found that the inlet pressures to Thruster PM1R for 2-thruster and 3-thruster operation as well as single thruster operation with the PMS compare very favorably indicating that flow rates to Thruster PM1R were similar in all cases. Characterizations of discharge losses, accelerator grid current, and neutralizer performance were performed as more operating thrusters were added to the PMS. There were no variations in these parameters as thrusters were throttled and single and multiple thruster operations were conducted. The propellant management system power consumption was at a fixed voltage to the DCIU and a fixed thermal throttle temperature of 75 C. The total power consumed by the PMS was 10.0, 17.9, and 25.2 W, respectively, for single, 2-thruster, and 3-thruster operation with the PMS. These sub-system integration tests of the PMS, the DCIU Simulator, and multiple thrusters addressed, in part, the NEXT PMS and propulsion system performance and functionality requirements.

  5. Advanced NSTS propulsion system verification study

    NASA Technical Reports Server (NTRS)

    Wood, Charles

    1989-01-01

    The merits of propulsion system development testing are discussed. The existing data base of technical reports and specialists is utilized in this investigation. The study encompassed a review of all available test reports of propulsion system development testing for the Saturn stages, the Titan stages, and the Space Shuttle main propulsion system. The knowledge on propulsion system development and system testing available from specialists and managers was also 'tapped' for inclusion.

  6. Management of a TIFS System: Organizing Tests with Instructional Feedback on Slides.

    ERIC Educational Resources Information Center

    Brown, F. Dale; Mitchell, Thomas O.

    1980-01-01

    Presents three components of the tests with instructional feedback on slides system (TIFS), the needs of the three, background on the production of the test item reference card, and the advantage of the system for both instructor and student. (MER)

  7. A Multilayer Secure Biomedical Data Management System for Remotely Managing a Very Large Number of Diverse Personal Healthcare Devices.

    PubMed

    Park, KeeHyun; Lim, SeungHyeon

    2015-01-01

    In this paper, a multilayer secure biomedical data management system for managing a very large number of diverse personal health devices is proposed. The system has the following characteristics: the system supports international standard communication protocols to achieve interoperability. The system is integrated in the sense that both a PHD communication system and a remote PHD management system work together as a single system. Finally, the system proposed in this paper provides user/message authentication processes to securely transmit biomedical data measured by PHDs based on the concept of a biomedical signature. Some experiments, including the stress test, have been conducted to show that the system proposed/constructed in this study performs very well even when a very large number of PHDs are used. For a stress test, up to 1,200 threads are made to represent the same number of PHD agents. The loss ratio of the ISO/IEEE 11073 messages in the normal system is as high as 14% when 1,200 PHD agents are connected. On the other hand, no message loss occurs in the multilayered system proposed in this study, which demonstrates the superiority of the multilayered system to the normal system with regard to heavy traffic.

  8. A Multilayer Secure Biomedical Data Management System for Remotely Managing a Very Large Number of Diverse Personal Healthcare Devices

    PubMed Central

    Lim, SeungHyeon

    2015-01-01

    In this paper, a multilayer secure biomedical data management system for managing a very large number of diverse personal health devices is proposed. The system has the following characteristics: the system supports international standard communication protocols to achieve interoperability. The system is integrated in the sense that both a PHD communication system and a remote PHD management system work together as a single system. Finally, the system proposed in this paper provides user/message authentication processes to securely transmit biomedical data measured by PHDs based on the concept of a biomedical signature. Some experiments, including the stress test, have been conducted to show that the system proposed/constructed in this study performs very well even when a very large number of PHDs are used. For a stress test, up to 1,200 threads are made to represent the same number of PHD agents. The loss ratio of the ISO/IEEE 11073 messages in the normal system is as high as 14% when 1,200 PHD agents are connected. On the other hand, no message loss occurs in the multilayered system proposed in this study, which demonstrates the superiority of the multilayered system to the normal system with regard to heavy traffic. PMID:26247034

  9. Weather responsive traffic signal timing in Utah Department of Transportation.

    DOT National Transportation Integrated Search

    1993-06-01

    The Design of Support Systems for Advanced Traffic Management Systems Project is a five-year program to define, design, and field test prototype systems to support the multitude of functions within Traffic Management Centers (TMC). Mature TMCs of the...

  10. Implementation of Integrated System Fault Management Capability

    NASA Technical Reports Server (NTRS)

    Figueroa, Fernando; Schmalzel, John; Morris, Jon; Smith, Harvey; Turowski, Mark

    2008-01-01

    Fault Management to support rocket engine test mission with highly reliable and accurate measurements; while improving availability and lifecycle costs. CORE ELEMENTS: Architecture, taxonomy, and ontology (ATO) for DIaK management. Intelligent Sensor Processes; Intelligent Element Processes; Intelligent Controllers; Intelligent Subsystem Processes; Intelligent System Processes; Intelligent Component Processes.

  11. [Biological evaluation within a risk management process].

    PubMed

    Zhuang, Fei; Ding, Biao

    2007-07-01

    Bio-evaluation within the medical device quality/risk management system is a risk analyzing and assessing process. On the basis of data from characterization of materials, scientific literatures, application history, bio-toxicology testing and so on, weighing the benefit and the risk, bio-evaluation does a conclusion to "take" or "quit" the product design. There is no "zero risk" though "no toxicity" always is the most desirable conclusion in a testing report. The application history data is the most comprehensive among the information available, since no testing system can "clone" the human body. In addition, the capital cost has to be taken into account when bringing the sophisticated testing technologies into the evaluating system. Investigating the #G95-1 of FDA CDRH and the changes of ISO 10993-1, the trend to integrate bio-evaluation into a quality/risk management process can be figured out.

  12. RHODES-ITMS-MILOS : ramp metering system test

    DOT National Transportation Integrated Search

    2002-04-01

    The RHODES-Integrated Traffic Management System Program addresses the design and development of a real-time traffic adaptive control system for an integrated system of freeways and arterial roads. The goals of this project were to test coordinated, a...

  13. Considerations for setting up an order entry system for nuclear medicine tests.

    PubMed

    Hara, Narihiro; Onoguchi, Masahisa; Nishida, Toshihiko; Honda, Minoru; Houjou, Osamu; Yuhi, Masaru; Takayama, Teruhiko; Ueda, Jun

    2007-12-01

    Integrating the Healthcare Enterprise-Japan (IHE-J) was established in Japan in 2001 and has been working to standardize health information and make it accessible on the basis of the fundamental Integrating Healthcare Enterprise (IHE) specifications. However, because specialized operations are used in nuclear medicine tests, online sharing of patient information and test order information from the order entry system as shown by the scheduled workflow (SWF) is difficult, making information inconsistent throughout the facility and uniform management of patient information impossible. Therefore, we examined the basic design (subsystem design) for order entry systems, which are considered an important aspect of information management for nuclear medicine tests and needs to be consistent with the system used throughout the rest of the facility. There are many items that are required by the subsystem when setting up an order entry system for nuclear medicine tests. Among these items, those that are the most important in the order entry system are constructed using exclusion settings, because of differences in the conditions for using radiopharmaceuticals and contrast agents and appointment frame settings for differences in the imaging method and test items. To establish uniform management of patient information for nuclear medicine tests throughout the facility, it is necessary to develop an order entry system with exclusion settings and appointment frames as standard features. Thereby, integration of health information with the Radiology Information System (RIS) or Picture Archiving Communication System (PACS) based on Digital Imaging Communications in Medicine (DICOM) standards and real-time health care assistance can be attained, achieving the IHE agenda of improving health care service and efficiently sharing information.

  14. NASA Conducts "Out of Sight" Drone Tests in Nevada

    NASA Image and Video Library

    2016-10-27

    Shareable video highlighting NASA's work with the Federal Aviation Administration (FAA) to develop an air traffic management platform for drones, called the Unmanned Aircraft Systems Traffic Management system or UTM.

  15. One Paradox in District Accountability and Site-Based Management.

    ERIC Educational Resources Information Center

    Shellman, David W.

    The paradox of site-based school management with use of standardized tests or instructional management systems that restrict teacher choices was evident in one school district in North Carolina in which measurement of student success has centered on student performance on state-mandated tests. A study was conducted to see if students whose…

  16. Human Machine Interface Programming and Testing

    NASA Technical Reports Server (NTRS)

    Foster, Thomas Garrison

    2013-01-01

    Human Machine Interface (HMI) Programming and Testing is about creating graphical displays to mimic mission critical ground control systems in order to provide NASA engineers with the ability to monitor the health management of these systems in real time. The Health Management System (HMS) is an online interactive human machine interface system that monitors all Kennedy Ground Control Subsystem (KGCS) hardware in the field. The Health Management System is essential to NASA engineers because it allows remote control and monitoring of the health management systems of all the Programmable Logic Controllers (PLC) and associated field devices. KGCS will have equipment installed at the launch pad, Vehicle Assembly Building, Mobile Launcher, as well as the Multi-Purpose Processing Facility. I am designing graphical displays to monitor and control new modules that will be integrated into the HMS. The design of the display screen will closely mimic the appearance and functionality of the actual modules. There are many different field devices used to monitor health management and each device has its own unique set of health management related data, therefore each display must also have its own unique way to display this data. Once the displays are created, the RSLogix5000 application is used to write software that maps all the required data read from the hardware to the graphical display. Once this data is mapped to its corresponding display item, the graphical display and hardware device will be connected through the same network in order to test all possible scenarios and types of data the graphical display was designed to receive. Test Procedures will be written to thoroughly test out the displays and ensure that they are working correctly before being deployed to the field. Additionally, the Kennedy Ground Controls Subsystem's user manual will be updated to explain to the NASA engineers how to use the new module displays.

  17. Initial Usability and Feasibility Evaluation of a Personal Health Record-Based Self-Management System for Older Adults.

    PubMed

    Sheehan, Barbara; Lucero, Robert J

    2015-01-01

    Electronic personal health record-based (ePHR-based) self-management systems can improve patient engagement and have an impact on health outcomes. In order to realize the benefits of these systems, there is a need to develop and evaluate heath information technology from the same theoretical underpinnings. Using an innovative usability approach based in human-centered distributed information design (HCDID), we tested an ePHR-based falls-prevention self-management system-Self-Assessment via a Personal Health Record (i.e., SAPHeR)-designed using HCDID principles in a laboratory. And we later evaluated SAPHeR's use by community-dwelling older adults at home. The innovative approach used in this study supported the analysis of four components: tasks, users, representations, and functions. Tasks were easily learned and features such as text-associated images facilitated task completion. Task performance times were slow, however user satisfaction was high. Nearly seven out of every ten features desired by design participants were evaluated in our usability testing of the SAPHeR system. The in vivo evaluation suggests that older adults could improve their confidence in performing indoor and outdoor activities after using the SAPHeR system. We have applied an innovative consumer-usability evaluation. Our approach addresses the limitations of other usability testing methods that do not utilize consistent theoretically based methods for designing and testing technology. We have successfully demonstrated the utility of testing consumer technology use across multiple components (i.e., task, user, representational, functional) to evaluate the usefulness, usability, and satisfaction of an ePHR-based self-management system.

  18. 76 FR 14375 - United States Integrated Ocean Observing System Advisory Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-16

    ... coastal resources; and public safety. The System is also designed to promote research to develop, test...; coastal management; fisheries management; coastal and marine spatial planning; geodesy; water levels; and...

  19. Management Information Systems for Higher Education. Studies in Institutional Management in Higher Education.

    ERIC Educational Resources Information Center

    Hussain, K. M., Ed.

    Contents include an introduction to information systems (basic concepts and life-cycle); development of an information system (design, implementation, testing, and conversion); operation (evaluation and maintenance, quality control, and economics); and case studies of such systems at the New University of Lisbon, Bath University, Laval University…

  20. Proceedings of the Annual National Conference on ADA Technology (9th) Held in Washington, DC on 4-7 March 1991

    DTIC Science & Technology

    1991-03-07

    rsolve the attack; delay whil the weapon has to wait; RESOURCE ALLOCATION . PRIORITY OF signal readiness to CONTROL; TARGETS. AND BIAS OF THE SYSTEM...Communications Systems. focal point for Computer Resource He served as project manager for the Management (CRM), Advanced Software development of the Joint...Interface Test Technology (AST), Ada Technology, Systems (JITS) - the world’s largest Joint/Army Interoperability Testing distributed command and

  1. Conceptual PHES-system models of the Aysén watershed and fjord (Southern Chile): testing a brainstorming strategy.

    PubMed

    Marín, Víctor H; Delgado, Luisa E; Bachmann, Pamela

    2008-09-01

    The use of brainstorming techniques for the generation of conceptual models, as the basis for the integrated management of physical-ecological-social systems (PHES-systems) is tested and discussed. The methodology is applied in the analysis of the Aysén fjord and watershed (Southern Chilean Coast). Results show that the proposed methods can be adequately used in management scenarios characterized by highly hierarchical, experts/non-experts membership.

  2. Individualizing Educational Strategies: An Apple Computer Managed System for the Diagnosis and Evaluation of Reading, Math and Behavior.

    ERIC Educational Resources Information Center

    Kern, Richard

    1985-01-01

    A computer-based interactive system for diagnosing academic and school behavior problems is described. Elements include criterion-referenced testing, an instructional management system, and a behavior evaluation tool developed by the author. (JW)

  3. Evaluation of power control concepts using the PMAD systems test bed. [Power Management and Distribution

    NASA Technical Reports Server (NTRS)

    Beach, R. F.; Kimnach, G. L.; Jett, T. A.; Trash, L. M.

    1989-01-01

    The Lewis Research Center's Power Management and Distribution (PMAD) System testbed and its use in the evaluation of control concepts applicable to the NASA Space Station Freedom electric power system (EPS) are described. The facility was constructed to allow testing of control hardware and software in an environment functionally similar to the space station electric power system. Control hardware and software have been developed to allow operation of the testbed power system in a manner similar to a supervisory control and data acquisition (SCADA) system employed by utility power systems for control. The system hardware and software are described.

  4. [Building and implementation of management system in laboratories of the National Institute of Hygiene].

    PubMed

    Rozbicka, Beata; Brulińska-Ostrowska, Elzbieta

    2008-01-01

    The rules of good laboratory practice have always been observed in the laboratories of National Institute of Hygiene (NIH) and the reliability of the results has been carefully cared after when performing tests for clients. In 2003 the laboratories performing analyses related to food safety were designated as the national reference laboratories. This, added to the necessity of compliance with work standards and requirements of EU legislation and to the need of confirmation of competence by an independent organisation, led to a decision to seek accreditation of Polish Centre of Accreditation (PCA). The following stages of building and implementation of management system were presented: training, modifications of Institute's organisational structure, elaboration of management system's documentation, renovation and refurbishment of laboratory facilities, implementation of measuring and test equipment's supervision, internal audits and management review. The importance of earlier experiences and achievements with regard to validation of analytical methods and guarding of the quality of the results through organisation and participation in proficiency tests was highlighted. Current status of accreditation of testing procedures used in NIH laboratories that perform analyses in the field of chemistry, microbiology, radiobiology and medical diagnostic tests was presented.

  5. Waste Receiving and Processing (WRAP) Facility PMS Test Report For Data Management System (DMS) Security Test DMS-Y2K

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    PALMER, M.E.

    1999-09-21

    Test Plan HNF-4351 defines testing requirements for installation of a new server in the WRAP Facility. This document shows the results of the test reports on the DMS-Y2K and DMS-F81 (Security) systems.

  6. Develop and test fuel cell powered on-site integrated total energy system

    NASA Technical Reports Server (NTRS)

    Kaufman, A.; Feigenbaum, H.; Wang, C. L.; Werth, J.; Whelan, J. A.

    1983-01-01

    Test results are presented for a 24 cell, two sq ft (4kW) stack. This stack is a precursor to a 25kW stack that is a key milestone. Results are discussed in terms of cell performance, electrolyte management, thermal management, and reactant gas manifolding. The results obtained in preliminary testing of a 50kW methanol processing subsystem are discussed. Subcontracting activities involving application analysis for fuel cell on site integrated energy systems are updated.

  7. DARPA/USAF/USN J-UCAS X-45A System Demonstration Program: A Review of Flight Test Site Processes and Personnel

    NASA Technical Reports Server (NTRS)

    Cosentino, Gary B.

    2008-01-01

    The Joint Unmanned Combat Air Systems (J-UCAS) program is a collaborative effort between the Defense Advanced Research Project Agency (DARPA), the US Air Force (USAF) and the US Navy (USN). Together they have reviewed X-45A flight test site processes and personnel as part of a system demonstration program for the UCAV-ATD Flight Test Program. The goal was to provide a disciplined controlled process for system integration and testing and demonstration flight tests. NASA's Dryden Flight Research Center (DFRC) acted as the project manager during this effort and was tasked with the responsibilities of range and ground safety, the provision of flight test support and infrastructure and the monitoring of technical and engineering tasks. DFRC also contributed their engineering knowledge through their contributions in the areas of autonomous ground taxi control development, structural dynamics testing and analysis and the provision of other flight test support including telemetry data, tracking radars, and communications and control support equipment. The Air Force Flight Test Center acted at the Deputy Project Manager in this effort and was responsible for the provision of system safety support and airfield management and air traffic control services, among other supporting roles. The T-33 served as a J-UCAS surrogate aircraft and demonstrated flight characteristics similar to that of the the X-45A. The surrogate served as a significant risk reduction resource providing mission planning verification, range safety mission assessment and team training, among other contributions.

  8. The Design, Development and Testing of Complex Avionics Systems: Conference Proceedings Held at the Avionics Panel Symposium in Las Vegas, Nevada on 27 April-1 May 1987

    DTIC Science & Technology

    1987-12-01

    Normally, the system is decomposed into manageable parts with accurately defined interfaces. By rigidly controlling this process, aerospace companies have...Reference A CHANGE IN SYSTEM DESIGN EMPHASIS: FROM MACHINE TO MAN by M.L.Metersky and J.L.Ryder 16 SESSION I1 - MANAGING THE FUl URE SYSTEM DESIGN...PROCESS MANAGING ADVANCED AVIONIC SYSTEM DESIGN by P.Simons 17 ERGONOMIE PSYCHOSENSORIELLE DES COCKPITS, INTERET DES SYSTEMES INFORMATIQUES INTELLIGENTS

  9. Final Environmental Assessment: Demolition of Barracks (Building T-2) at Ipswich Antenna Test Facility

    DTIC Science & Technology

    2011-12-01

    EIAP), managed the preparation and was the primary author of this environmental assessment. QAULITY ASSURANCE LEADER Cravedi, Gregory. 66 ABG/CE...BMP Best Management Practice CEQ Council on Environmental Quality CERCLA Comprehensive Environmental Response, Compensation, and Liability Act...Assessment EMCS Energy Management Control System ESC Electronic Systems Center FEMA Federal Emergency Management Agency FIRM Federal

  10. Skylab Medical Experiments Altitude Test /SMEAT/ facility design and operation.

    NASA Technical Reports Server (NTRS)

    Hinners, A. H., Jr.; Correale, J. V.

    1973-01-01

    This paper presents the design approaches and test facility operation methods used to successfully accomplish a 56-day test for Skylab to permit evaluation of selected Skylab medical experiments in a ground test simulation of the Skylab environment with an astronaut crew. The systems designed for this test include the two-gas environmental control system, the fire suppression and detection system, equipment transfer lock, ground support equipment, safety systems, potable water system, waste management system, lighting and power system, television monitoring, communications and recreation systems, and food freezer.

  11. Implementation of a data management software system for SSME test history data

    NASA Technical Reports Server (NTRS)

    Abernethy, Kenneth

    1986-01-01

    The implementation of a software system for managing Space Shuttle Main Engine (SSME) test/flight historical data is presented. The software system uses the database management system RIM7 for primary data storage and routine data management, but includes several FORTRAN programs, described here, which provide customized access to the RIM7 database. The consolidation, modification, and transfer of data from the database THIST, to the RIM7 database THISRM is discussed. The RIM7 utility modules for generating some standard reports from THISRM and performing some routine updating and maintenance are briefly described. The FORTRAN accessing programs described include programs for initial loading of large data sets into the database, capturing data from files for database inclusion, and producing specialized statistical reports which cannot be provided by the RIM7 report generator utility. An expert system tutorial, constructed using the expert system shell product INSIGHT2, is described. Finally, a potential expert system, which would analyze data in the database, is outlined. This system could use INSIGHT2 as well and would take advantage of RIM7's compatibility with the microcomputer database system RBase 5000.

  12. A new specimen management system using RFID technology.

    PubMed

    Shim, Hun; Uh, Young; Lee, Seung Hwan; Yoon, Young Ro

    2011-12-01

    The specimen management system with barcode needs to be improved in order to solve inherent problems in work performance. This study describes the application of Radio Frequency Identification (RFID) which is the solution for the problems associated with specimen labeling and management. A new specimen management system and architecture with RFID technology for clinical laboratory was designed. The suggested system was tested in various conditions such as durability to temperature and aspect of effective utilization of new work flow under a virtual hospital clinical laboratory environment. This system demonstrates its potential application in clinical laboratories for improving work flow and specimen management. The suggested specimen management system with RFID technology has advantages in comparison to the traditional specimen management system with barcode in the aspect of mass specimen processing, robust durability of temperature, humidity changes, and effective specimen tracking.

  13. Improving laboratory efficiencies to scale-up HIV viral load testing.

    PubMed

    Alemnji, George; Onyebujoh, Philip; Nkengasong, John N

    2017-03-01

    Viral load measurement is a key indicator that determines patients' response to treatment and risk for disease progression. Efforts are ongoing in different countries to scale-up access to viral load testing to meet the Joint United Nations Programme on HIV and AIDS target of achieving 90% viral suppression among HIV-infected patients receiving antiretroviral therapy. However, the impact of these initiatives may be challenged by increased inefficiencies along the viral load testing spectrum. This will translate to increased costs and ineffectiveness of scale-up approaches. This review describes different parameters that could be addressed across the viral load testing spectrum aimed at improving efficiencies and utilizing test results for patient management. Though progress is being made in some countries to scale-up viral load, many others still face numerous challenges that may affect scale-up efficiencies: weak demand creation, ineffective supply chain management systems; poor specimen referral systems; inadequate data and quality management systems; and weak laboratory-clinical interface leading to diminished uptake of test results. In scaling up access to viral load testing, there should be a renewed focus to address efficiencies across the entire spectrum, including factors related to access, uptake, and impact of test results.

  14. An Integrated Information System for Supporting Quality Management Tasks

    NASA Astrophysics Data System (ADS)

    Beyer, N.; Helmreich, W.

    2004-08-01

    In a competitive environment, well defined processes become the strategic advantage of a company. Hence, targeted Quality Management ensures efficiency, trans- parency and, ultimately, customer satisfaction. In the particular context of a Space Test Centre, a num- ber of specific Quality Management standards have to be applied. According to the revision of ISO 9001 dur- ing 2000, and due to the adaptation of ECSS-Q20-07, process orientation and data analysis are key tasks for ensuring and evaluating the efficiency of a company's processes. In line with these requirements, an integrated management system for accessing the necessary infor- mation to support Quality Management and other proc- esses has been established. Some of its test-related fea- tures are presented here. Easy access to the integrated management system from any work place at IABG's Space Test Centre is ensured by means of an intranet portal. It comprises a full set of quality-related process descriptions, information on test facilities, emergency procedures, and other relevant in- formation. The portal's web interface provides direct access to a couple of external applications. Moreover, easy updating of all information and low cost mainte- nance are features of this integrated information system. The timely and transparent management of non- conformances is covered by a dedicated NCR database which incorporates full documentation capability, elec- tronic signature and e-mail notification of concerned staff. A search interface allows for queries across all documented non-conformances. Furthermore, print ver- sions can be generated at any stage in the process, e.g. for distribution to customers. Feedback on customer satisfaction is sought through a web-based questionnaire. The process is initiated by the responsible test manager through submission of an e- mail that contains a hyperlink to a secure website, ask- ing the customer to complete the brief online form, which is directly fed to a database for subsequent evaluation by the Quality Manager. All such information can be processed and presented in an appropriate manner for internal or external audits, as well as for regular management reviews.

  15. DoD Major Automated Information Systems: Improvements Can Be Made in Applying Leading Practices for Managing Risk and Testing

    DTIC Science & Technology

    2017-03-01

    Government Accountability Office Highlights of GAO-17-322, a report to congressional committees March 2017 DOD MAJOR AUTOMATED INFORMATION ...DOD MAJOR AUTOMATED INFORMATION SYSTEMS Improvements Can Be Made in Applying Leading Practices for Managing Risk and...Testing Report to Congressional Committees March 2017 GAO-17-322 United States Government Accountability Office United States

  16. Test processing system (SEE)

    NASA Technical Reports Server (NTRS)

    Gaulene, P.

    1986-01-01

    The SEE data processing system, developed in 1985, manages and process test results. General information is provided on the SEE system: objectives, characteristics, basic principles, general organization, and operation. Full documentation is accessible by computer using the HELP SEE command.

  17. Detailed requirements document for the Interactive Financial Management System (IFMS), volume 1

    NASA Technical Reports Server (NTRS)

    Dodson, D. B.

    1975-01-01

    The detailed requirements for phase 1 (online fund control, subauthorization accounting, and accounts receivable functional capabilities) of the Interactive Financial Management System (IFMS) are described. This includes information on the following: systems requirements, performance requirements, test requirements, and production implementation. Most of the work is centered on systems requirements, and includes discussions on the following processes: resources authority, allotment, primary work authorization, reimbursable order acceptance, purchase request, obligation, cost accrual, cost distribution, disbursement, subauthorization performance, travel, accounts receivable, payroll, property, edit table maintenance, end-of-year, backup input. Other subjects covered include: external systems interfaces, general inquiries, general report requirements, communication requirements, and miscellaneous. Subjects covered under performance requirements include: response time, processing volumes, system reliability, and accuracy. Under test requirements come test data sources, general test approach, and acceptance criteria. Under production implementation come data base establishment, operational stages, and operational requirements.

  18. Quantitative Evaluation of 3 DBMS: ORACLE, SEED AND INGRES

    NASA Technical Reports Server (NTRS)

    Sylto, R.

    1984-01-01

    Characteristics required for NASA scientific data base management application are listed as well as performance testing objectives. Results obtained for the ORACLE, SEED, and INGRES packages are presented in charts. It is concluded that vendor packages can manage 130 megabytes of data at acceptable load and query rates. Performance tests varying data base designs and various data base management system parameters are valuable to applications for choosing packages and critical to designing effective data bases. An applications productivity increases with the use of data base management system because of enhanced capabilities such as a screen formatter, a reporter writer, and a data dictionary.

  19. Unmanned Aircraft Systems Traffic Management (UTM) Safely Enabling UAS Operations in Low-Altitude Airspace

    NASA Technical Reports Server (NTRS)

    Kopardekar, Parimal H.

    2016-01-01

    Unmanned Aircraft System (UAS) Traffic Management (UTM) Enabling Civilian Low-Altitude Airspace and Unmanned Aircraft System Operations What is the problem? Many beneficial civilian applications of UAS have been proposed, from goods delivery and infrastructure surveillance, to search and rescue, and agricultural monitoring. Currently, there is no established infrastructure to enable and safely manage the widespread use of low-altitude airspace and UAS operations, regardless of the type of UAS. A UAS traffic management (UTM) system for low-altitude airspace may be needed, perhaps leveraging concepts from the system of roads, lanes, stop signs, rules and lights that govern vehicles on the ground today, whether the vehicles are driven by humans or are automated. What system technologies is NASA exploring? Building on its legacy of work in air traffic management for crewed aircraft, NASA is researching prototype technologies for a UAS Traffic Management (UTM) system that could develop airspace integration requirements for enabling safe, efficient low-altitude operations. While incorporating lessons learned from the today's well-established air traffic management system, which was a response that grew out of a mid-air collision over the Grand Canyon in the early days of commercial aviation, the UTM system would enable safe and efficient low-altitude airspace operations by providing services such as airspace design, corridors, dynamic geofencing, severe weather and wind avoidance, congestion management, terrain avoidance, route planning and re-routing, separation management, sequencing and spacing, and contingency management. One of the attributes of the UTM system is that it would not require human operators to monitor every vehicle continuously. The system could provide to human managers the data to make strategic decisions related to initiation, continuation, and termination of airspace operations. This approach would ensure that only authenticated UAS could operate in the airspace. In its most mature form, the UTM system could be developed using autonomicity characteristics that include self-configuration, self-optimization and self-protection. The self-configuration aspect could determine whether the operations should continue given the current andor predicted windweather conditions. NASA envisions concepts for two types of possible UTM systems. The first type would be a Portable UTM system, which would move from between geographical areas and support operations such as precision agriculture and disaster relief. The second type of system would be a Persistent UTM system, which would support low-altitude operations and provide continuous coverage for a geographical area. Either system would require persistent communication, navigation, and surveillance (CNS) coverage to track, ensure, and monitor conformance. What is NASA doing to test the technologies? NASA's near-term goal is the development and demonstration of a possible future UTM system that could safely enable low-altitude airspace and UAS operations. Working alongside many committed government, industry and academic partners, NASA is leading the research, development and testing that is taking place in a series of activities called Technology Capability Levels (TCL), each increasing in complexity. UTM TCL1 concluded field testing in August 2015 and is undergoing additional testing at an FAA site.

  20. 41 CFR 300-90.2 - Who may authorize test programs?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 41 Public Contracts and Property Management 4 2014-07-01 2014-07-01 false Who may authorize test programs? 300-90.2 Section 300-90.2 Public Contracts and Property Management Federal Travel Regulation System GENERAL AGENCY REQUIREMENTS 90-TELEWORK TRAVEL EXPENSES TEST PROGRAMS § 300-90.2 Who may authorize...

  1. Strengthening of Indonesia school of management in the 21st century through the implementation of school management system based information technology and communications integrated

    NASA Astrophysics Data System (ADS)

    Setiawan, Wawan; Munir, Senen, Syamsul Hadi; Nugroho, Eddy Prasetyo; Wihardi, Yaya; Nugraha, Eki

    2017-05-01

    Indonesia strengthening school management through the implementation of School Management System Based Information Technology and Communications (SMS-ICT) is intended to improve the performance of schools to accommodate the complexities of management in a computerized system that is simple but comprehensive so that it aligns with the era of the 21st century. School Management System Based Information and Communication Technology-based standards developed 12 education, adapted from 8 national standards into the system components that support the characteristics of 21st century schools. Twelfth system components include curriculum, Personal Development, Recruitment of New Student Services and Student Development, Education Labor and Education, Infrastructure, Leadership, School Management, Financing, Evaluation, and Social Communications. Development of the system is done through the stages of systematically covering Need Assessment, System Design, System Development, Testing Limited, Reveiw and Improvement, Testing Expanded, Finalize, and Packaging. SMS-ICT has gained Copyright and had seminars both nationally and internationally, and have been published by national journals, and in a book chapter. SMS-ICT applied to several schools in districy/city of West Java is based on cooperation with the Education Department of West Java. Implementation of School Management System as strengthening school management Indonesia shows the essential matters of school management. SMS-ICT managed to bring changes not only bring substantial improvements to the school how it should be managed, but also change the mindset of school leaders and teachers in ways of thinking and acting more professional in carrying out their respective duties. SMS-ICT managed as a unified system of governance that is integrated schools overall strategic component in an integrated system that implements ICT that has the capacity to process data and information quickly, accurately and reliably. SMS-ICT as a mainstay to foster confidence that their school is a superior school that can be presented and demonstrated significantly. School leaders have the managerial instrument to control and develop all essential aspects in a comprehensive school. Empowering ICT appropriately and productively in school management processes, not only as a substitute for a typewriter and not only as a display.

  2. Automation of Space Station module power management and distribution system

    NASA Technical Reports Server (NTRS)

    Bechtel, Robert; Weeks, Dave; Walls, Bryan

    1990-01-01

    Viewgraphs on automation of space station module (SSM) power management and distribution (PMAD) system are presented. Topics covered include: reasons for power system automation; SSM/PMAD approach to automation; SSM/PMAD test bed; SSM/PMAD topology; functional partitioning; SSM/PMAD control; rack level autonomy; FRAMES AI system; and future technology needs for power system automation.

  3. Demand management: an audit of chemical pathology test rejections by an electronic gate-keeping system at an academic hospital in Cape Town.

    PubMed

    Smit, Ida; Zemlin, Annalise E; Erasmus, Rajiv T

    2015-07-01

    Demand management is an area of laboratory activity, which is becoming increasingly important. Within the health-care system, demand management can be defined as the use of health resources to maximise its utility. Tygerberg Hospital has introduced an electronic gate-keeping system. Chemistry tests which generate the highest cost are subjected to this system and may be automatically rejected according to a set of rules. This study aimed: (1) to identify the number of chemistry tests rejected by the eGK; (2) to identify which of these rejected tests were subsequently restored and (3) to assess the impact of rejections on clinical outcome and cost-saving. A retrospective audit was conducted to determine the number of chemistry tests rejected and subsequently restored over a 6-month period. The case-notes of patients for whom requested tests previously rejected had been restored were randomly selected and investigated to assess clinical impact. Any cost-saving was calculated. A total of 68,480 tests were subjected to gate-keeping, and 4605 tests (6.7%) were rejected while 679 (14.7%) of these were restored by the requestor phoning the laboratory after obtaining authorisation. After examining a subset of clinical notes it was found that in most cases (80%), patient care was unaffected. The total cost saved was £ 25,387. The majority of the rejected tests were unnecessary and following rejection, real savings were made. Electronic gate-keeping is a simple, effective and sustainable method of demand management. © The Author(s) 2015 Reprints and permissions: sagepub.co.uk/journalsPermissions.nav.

  4. 78 FR 47805 - Test Documentation for Digital Computer Software Used in Safety Systems of Nuclear Power Plants

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-06

    ... Documents Access and Management System (ADAMS): You may access publicly available documents online in the... Management Plans for Digital Computer Software used in Safety Systems of Nuclear Power Plants,'' issued for... Used in Safety Systems of Nuclear Power Plants AGENCY: Nuclear Regulatory Commission. ACTION: Revision...

  5. Personal diabetes management system based on ubiquitous computing technology.

    PubMed

    Park, Kyung-Soon; Kim, Nam-Jin; Hong, Joo-Hyun; Park, Mi-Sook; Cha, Eun-Jung; Lee, Tae-Soo

    2006-01-01

    Assisting diabetes patients to self manage blood glucose test and insulin injection is of great importance for their healthcare. This study presented a PDA based system to manage the personal glucose level data interfaced with a small glucometer through a serial port. The data stored in the PDA can be transmitted by cradle or wireless communication to the remote web-server, where further medical analysis and service is provided. This system enables more efficient and systematic management of diabetes patients through self management and remote medical practice.

  6. Study of systems and techniques for data base management

    NASA Technical Reports Server (NTRS)

    1976-01-01

    Data management areas were studied to identify pertinent problems and issues that will affect future NASA data users in terms of performance and cost. Specific topics discussed include the identifications of potential NASA data users other than those normally discussed, consideration affecting the clustering of minicomputers, low cost computer system for information retrieval and analysis, the testing of minicomputer based data base management systems, ongoing work related to the use of dedicated systems for data base management, and the problems of data interchange among a community of NASA data users.

  7. Job submission and management through web services: the experience with the CREAM service

    NASA Astrophysics Data System (ADS)

    Aiftimiei, C.; Andreetto, P.; Bertocco, S.; Fina, S. D.; Ronco, S. D.; Dorigo, A.; Gianelle, A.; Marzolla, M.; Mazzucato, M.; Sgaravatto, M.; Verlato, M.; Zangrando, L.; Corvo, M.; Miccio, V.; Sciaba, A.; Cesini, D.; Dongiovanni, D.; Grandi, C.

    2008-07-01

    Modern Grid middleware is built around components providing basic functionality, such as data storage, authentication, security, job management, resource monitoring and reservation. In this paper we describe the Computing Resource Execution and Management (CREAM) service. CREAM provides a Web service-based job execution and management capability for Grid systems; in particular, it is being used within the gLite middleware. CREAM exposes a Web service interface allowing conforming clients to submit and manage computational jobs to a Local Resource Management System. We developed a special component, called ICE (Interface to CREAM Environment) to integrate CREAM in gLite. ICE transfers job submissions and cancellations from the Workload Management System, allowing users to manage CREAM jobs from the gLite User Interface. This paper describes some recent studies aimed at assessing the performance and reliability of CREAM and ICE; those tests have been performed as part of the acceptance tests for integration of CREAM and ICE in gLite. We also discuss recent work towards enhancing CREAM with a BES and JSDL compliant interface.

  8. On-board fault management for autonomous spacecraft

    NASA Technical Reports Server (NTRS)

    Fesq, Lorraine M.; Stephan, Amy; Doyle, Susan C.; Martin, Eric; Sellers, Suzanne

    1991-01-01

    The dynamic nature of the Cargo Transfer Vehicle's (CTV) mission and the high level of autonomy required mandate a complete fault management system capable of operating under uncertain conditions. Such a fault management system must take into account the current mission phase and the environment (including the target vehicle), as well as the CTV's state of health. This level of capability is beyond the scope of current on-board fault management systems. This presentation will discuss work in progress at TRW to apply artificial intelligence to the problem of on-board fault management. The goal of this work is to develop fault management systems. This presentation will discuss work in progress at TRW to apply artificial intelligence to the problem of on-board fault management. The goal of this work is to develop fault management systems that can meet the needs of spacecraft that have long-range autonomy requirements. We have implemented a model-based approach to fault detection and isolation that does not require explicit characterization of failures prior to launch. It is thus able to detect failures that were not considered in the failure and effects analysis. We have applied this technique to several different subsystems and tested our approach against both simulations and an electrical power system hardware testbed. We present findings from simulation and hardware tests which demonstrate the ability of our model-based system to detect and isolate failures, and describe our work in porting the Ada version of this system to a flight-qualified processor. We also discuss current research aimed at expanding our system to monitor the entire spacecraft.

  9. Undescended testicle

    MedlinePlus

    ... undescended testes); Monorchism; Vanished testes - undescended; Retractile testes Images Male reproductive anatomy Male reproductive system References Barthold JS, Hagerty JA. Etiology, diagnosis, and management of the ...

  10. Annual Report on Research, 1979 (U.S. Army Research Institute for the Behavioral and Social Sciences)

    DTIC Science & Technology

    1979-01-01

    Research ........................................... 17 Command, Control and Communication (C3) with Automated Battlefield Systems ...19 Life Cycle Systems Management ............................. 22 Cost and Training Effectiveness Analysis ....................... 24 Operational Test...Training Center ................................... 66 Unit Training Programs and Management Systems ............... 68 Personnel and Manpower

  11. Data base management system analysis and performance testing with respect to NASA requirements

    NASA Technical Reports Server (NTRS)

    Martin, E. A.; Sylto, R. V.; Gough, T. L.; Huston, H. A.; Morone, J. J.

    1981-01-01

    Several candidate Data Base Management Systems (DBM's) that could support the NASA End-to-End Data System's Integrated Data Base Management System (IDBMS) Project, later rescoped and renamed the Packet Management System (PMS) were evaluated. The candidate DBMS systems which had to run on the Digital Equipment Corporation VAX 11/780 computer system were ORACLE, SEED and RIM. Oracle and RIM are both based on the relational data base model while SEED employs a CODASYL network approach. A single data base application which managed stratospheric temperature profiles was studied. The primary reasons for using this application were an insufficient volume of available PMS-like data, a mandate to use actual rather than simulated data, and the abundance of available temperature profile data.

  12. Vehicle System Management Modeling in UML for Ares I

    NASA Technical Reports Server (NTRS)

    Pearson, Newton W.; Biehn, Bradley A.; Curry, Tristan D.; Martinez, Mario R.

    2011-01-01

    The Spacecraft & Vehicle Systems Department of Marshall Space Flight Center is responsible for modeling the Vehicle System Management for the Ares I vehicle which was a part of the now canceled Constellation Program. An approach to generating the requirements for the Vehicle System Management was to use the Unified Modeling Language technique to build and test a model that would fulfill the Vehicle System Management requirements. UML has been used on past projects (flight software) in the design phase of the effort but this was the first attempt to use the UML technique from a top down requirements perspective.

  13. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chen, K.; Tsai, H.; Decision and Information Sciences

    The technical basis for extending the Model 9977 shipping package periodic maintenance beyond the one-year interval to a maximum of five years is based on the performance of the O-ring seals and the environmental conditions. The DOE Packaging Certification Program (PCP) has tasked Argonne National Laboratory to develop a Radio-Frequency Identification (RFID) temperature monitoring system for use by the facility personnel at DAF/NTS. The RFID temperature monitoring system, depicted in the figure below, consists of the Mk-1 RFId tags, a reader, and a control computer mounted on a mobile platform that can operate as a stand-alone system, or it canmore » be connected to the local IT network. As part of the Conditions of Approval of the CoC, the user must complete the prescribed training to become qualified and be certified for operation of the RFID temperature monitoring system. The training course will be administered by Argonne National Laboratory on behalf of the Headquarters Certifying Official. This is a complete documentation package for the RFID temperature monitoring system of the Model 9977 packagings at NTS. The documentation package will be used for training and certification. The table of contents are: Acceptance Testing Procedure of MK-1 RFID Tags for DOE/EM Nuclear Materials Management Applications; Acceptance Testing Result of MK-1 RFID Tags for DOE/EM Nuclear Materials Management Applications; Performance Test of the Single Bolt Seal Sensor for the Model 9977 Packaging; Calibration of Built-in Thermistors in RFID Tags for Nevada Test Site; Results of Calibration of Built-in Thermistors in RFID Tags; Results of Thermal Calibration of Second Batch of MK-I RFID Tags; Procedure for Installing and Removing MK-1 RFID Tag on Model 9977 Drum; User Guide for RFID Reader and Software for Temperature Monitoring of Model 9977 Drums at NTS; Software Quality Assurance Plan (SQAP) for the ARG-US System; Quality Category for the RFID Temperature Monitoring System; The Documentation Package for the RFID Temperature Monitoring System; Software Test Plan and Results for ARG-US OnSite; Configuration Management Plan (CMP) for the ARG-US System; Requirements Management Plan for the ARG-US System; and Design Management Plan for ARG-US.« less

  14. Artificial intelligence and space power systems automation

    NASA Technical Reports Server (NTRS)

    Weeks, David J.

    1987-01-01

    Various applications of artificial intelligence to space electrical power systems are discussed. An overview is given of completed, on-going, and planned knowledge-based system activities. These applications include the Nickel-Cadmium Battery Expert System (NICBES) (the expert system interfaced with the Hubble Space Telescope electrical power system test bed); the early work with the Space Station Experiment Scheduler (SSES); the three expert systems under development in the space station advanced development effort in the core module power management and distribution system test bed; planned cooperation of expert systems in the Core Module Power Management and Distribution (CM/PMAD) system breadboard with expert systems for the space station at other research centers; and the intelligent data reduction expert system under development.

  15. Storage Information Management System (SIMS) Spaceflight Hardware Warehousing at Goddard Space Flight Center

    NASA Technical Reports Server (NTRS)

    Kubicko, Richard M.; Bingham, Lindy

    1995-01-01

    Goddard Space Flight Center (GSFC) on site and leased warehouses contain thousands of items of ground support equipment (GSE) and flight hardware including spacecraft, scaffolding, computer racks, stands, holding fixtures, test equipment, spares, etc. The control of these warehouses, and the management, accountability, and control of the items within them, is accomplished by the Logistics Management Division. To facilitate this management and tracking effort, the Logistics and Transportation Management Branch, is developing a system to provide warehouse personnel, property owners, and managers with storage and inventory information. This paper will describe that PC-based system and address how it will improve GSFC warehouse and storage management.

  16. System configuration management plan for 101-SY Hydrogen Mitigation Test Project Mini-Data Acquisition and Control System of Tank Waste Remediation System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vargo, G.F. Jr.

    1994-10-11

    The DOE Standard defines the configuration management program by the five basic program elements of ``program management,`` ``design requirements,`` ``document control,`` ``change control,`` and ``assessments,`` and the two adjunct recovery programs of ``design reconstitution,`` and ``material condition and aging management. The C-M model of five elements and two adjunct programs strengthen the necessary technical and administrative control to establish and maintain a consistent technical relationship among the requirements, physical configuration, and documentation. Although the DOE Standard was originally developed for the operational phase of nuclear facilities, this plan has the flexibility to be adapted and applied to all life-cycle phasesmore » of both nuclear and non-nuclear facilities. The configuration management criteria presented in this plan endorses the DOE Standard and has been tailored specifically to address the technical relationship of requirements, physical configuration, and documentation during the full life-cycle of the 101-SY Hydrogen Mitigation Test Project Mini-Data Acquisition and Control System of Tank Waste Remediation System.« less

  17. Common System and Software Testing Pitfalls

    DTIC Science & Technology

    2014-11-03

    GEN- TTE -1) Target Platform Difficult to Access (GEN- TTE -2) → Inadequate Test Environments (GEN- TTE -3) Poor Fidelity of Test Environments (GEN- TTE -4...Inadequate Test Environment Quality (GEN- TTE -5) Test Environments Inadequately Tested (GEN- TTE -6) [new pitfall] Inadequate Test Configuration...Management (GEN- TTE -7) 29Common System/SW Testing PitfallsDonald G. Firesmith, 3 November 2014 General Pitfalls – Automated Testing [new pitfall category

  18. Rocket Testing and Integrated System Health Management

    NASA Technical Reports Server (NTRS)

    Figueroa, Fernando; Schmalzel, John

    2005-01-01

    Integrated System Health Management (ISHM) describes a set of system capabilities that in aggregate perform: determination of condition for each system element, detection of anomalies, diagnosis of causes for anomalies, and prognostics for future anomalies and system behavior. The ISHM should also provide operators with situational awareness of the system by integrating contextual and timely data, information, and knowledge (DIaK) as needed. ISHM capabilities can be implemented using a variety of technologies and tools. This chapter provides an overview of ISHM contributing technologies and describes in further detail a novel implementation architecture along with associated taxonomy, ontology, and standards. The operational ISHM testbed is based on a subsystem of a rocket engine test stand. Such test stands contain many elements that are common to manufacturing systems, and thereby serve to illustrate the potential benefits and methodologies of the ISHM approach for intelligent manufacturing.

  19. Description of the PMAD systems test bed facility and data system

    NASA Technical Reports Server (NTRS)

    Trase, Larry; Fong, Don; Adkins, Vicki; Birchenough, Arthur

    1992-01-01

    The power management and distribution (PMAD) systems test bed facility, including the power sources and loads available, is discussed, and the PMAD data system (PDS) is described. The PDS controls the test-bed facility hardware, and monitors and records the electric power system control data bus and external data. The PDS architecture is discussed, and each of the subsystems is described.

  20. System and method for advanced power management

    DOEpatents

    Atcitty, Stanley [Albuquerque, NM; Symons, Philip C [Surprise, AZ; Butler, Paul C [Albuquerque, NM; Corey, Garth P [Albuquerque, NM

    2009-07-28

    A power management system is provided that includes a power supply means comprising a plurality of power supply strings, a testing means operably connected to said plurality of power supply strings for evaluating performance characteristics of said plurality of power supply strings, and a control means for monitoring power requirements and comprising a switching means for controlling switching of said plurality of power supply strings to said testing means.

  1. AgRISTARS: Renewable resources inventory. Land information support system implementation plan and schedule. [San Juan National Forest pilot test

    NASA Technical Reports Server (NTRS)

    Yao, S. S. (Principal Investigator)

    1981-01-01

    The planning and scheduling of the use of remote sensing and computer technology to support the land management planning effort at the national forests level are outlined. The task planning and system capability development were reviewed. A user evaluation is presented along with technological transfer methodology. A land management planning pilot test of the San Juan National Forest is discussed.

  2. ECLSS Universal Waste Management System (UWMS) Metal Materials Compatibility Study- Electrochemical and Crevice Corrosion Evaluation

    NASA Technical Reports Server (NTRS)

    Lee, R. E.

    2017-01-01

    Electrochemical and crevice corrosion laboratory test results are presented for three noble metal candidates with possible application on the Universal Waste Management System (UWMS) in support of the Environmental Control and Life Support System (ECLSS) aboard the International Space Station (ISS). The three metal candidates, which included Inconel 625, Hastelloy C276 and Titanium 6Al-4V, were evaluated in two solutions representative of the acidic pretreatment formulations utilized during processing of waste liquids within the ECLSS. Final test results and data analysis indicated that the passive layer on all three metals provides excellent corrosion protection in both solutions under standard test conditions.

  3. Configuration management issues and objectives for a real-time research flight test support facility

    NASA Technical Reports Server (NTRS)

    Yergensen, Stephen; Rhea, Donald C.

    1988-01-01

    An account is given of configuration management activities for the Western Aeronautical Test Range (WATR) at NASA-Ames, whose primary function is the conduct of aeronautical research flight testing through real-time processing and display, tracking, and communications systems. The processing of WATR configuration change requests for specific research flight test projects must be conducted in such a way as to refrain from compromising the reliability of WATR support to all project users. Configuration management's scope ranges from mission planning to operations monitoring and performance trend analysis.

  4. Aviation System Analysis Capability (ASAC) Quick Response System (QRS) Test Report

    NASA Technical Reports Server (NTRS)

    Roberts, Eileen; Villani, James A.; Ritter, Paul

    1997-01-01

    This document is the Aviation System Analysis Capability (ASAC) Quick Response System (QRS) Test Report. The purpose of this document is to present the results of the QRS unit and system tests in support of the ASAC QRS development effort. This document contains an overview of the project background and scope, defines the QRS system and presents the additions made to the QRS this year, explains the assumptions, constraints, and approach used to conduct QRS Unit and System Testing, and presents the schedule used to perform QRS Testing. The document also presents an overview of the Logistics Management Institute (LMI) Test Facility and testing environment and summarizes the QRS Unit and System Test effort and results.

  5. Increasing Complexity in Rule-Based Clinical Decision Support: The Symptom Assessment and Management Intervention.

    PubMed

    Lobach, David F; Johns, Ellis B; Halpenny, Barbara; Saunders, Toni-Ann; Brzozowski, Jane; Del Fiol, Guilherme; Berry, Donna L; Braun, Ilana M; Finn, Kathleen; Wolfe, Joanne; Abrahm, Janet L; Cooley, Mary E

    2016-11-08

    Management of uncontrolled symptoms is an important component of quality cancer care. Clinical guidelines are available for optimal symptom management, but are not often integrated into the front lines of care. The use of clinical decision support (CDS) at the point-of-care is an innovative way to incorporate guideline-based symptom management into routine cancer care. The objective of this study was to develop and evaluate a rule-based CDS system to enable management of multiple symptoms in lung cancer patients at the point-of-care. This study was conducted in three phases involving a formative evaluation, a system evaluation, and a contextual evaluation of clinical use. In Phase 1, we conducted iterative usability testing of user interface prototypes with patients and health care providers (HCPs) in two thoracic oncology clinics. In Phase 2, we programmed complex algorithms derived from clinical practice guidelines into a rules engine that used Web services to communicate with the end-user application. Unit testing of algorithms was conducted using a stack-traversal tree-spanning methodology to identify all possible permutations of pathways through each algorithm, to validate accuracy. In Phase 3, we evaluated clinical use of the system among patients and HCPs in the two clinics via observations, structured interviews, and questionnaires. In Phase 1, 13 patients and 5 HCPs engaged in two rounds of formative testing, and suggested improvements leading to revisions until overall usability scores met a priori benchmarks. In Phase 2, symptom management algorithms contained between 29 and 1425 decision nodes, resulting in 19 to 3194 unique pathways per algorithm. Unit testing required 240 person-hours, and integration testing required 40 person-hours. In Phase 3, both patients and HCPs found the system usable and acceptable, and offered suggestions for improvements. A rule-based CDS system for complex symptom management was systematically developed and tested. The complexity of the algorithms required extensive development and innovative testing. The Web service-based approach allowed remote access to CDS knowledge, and could enable scaling and sharing of this knowledge to accelerate availability, and reduce duplication of effort. Patients and HCPs found the system to be usable and useful. ©David F Lobach, Ellis B Johns, Barbara Halpenny, Toni-Ann Saunders, Jane Brzozowski, Guilherme Del Fiol, Donna L Berry, Ilana M Braun, Kathleen Finn, Joanne Wolfe, Janet L Abrahm, Mary E Cooley. Originally published in JMIR Medical Informatics (http://medinform.jmir.org), 08.11.2016.

  6. NASA Lewis Wind Tunnel Model Systems Criteria

    NASA Technical Reports Server (NTRS)

    Soeder, Ronald H.; Haller, Henry C.

    1994-01-01

    This report describes criteria for the design, analysis, quality assurance, and documentation of models or test articles that are to be tested in the aeropropulsion facilities at the NASA Lewis Research Center. The report presents three methods for computing model allowable stresses on the basis of the yield stress or ultimate stress, and it gives quality assurance criteria for models tested in Lewis' aeropropulsion facilities. Both customer-furnished model systems and in-house model systems are discussed. The functions of the facility manager, project engineer, operations engineer, research engineer, and facility electrical engineer are defined. The format for pretest meetings, prerun safety meetings, and the model criteria review are outlined Then, the format for the model systems report (a requirement for each model that is to be tested at NASA Lewis) is described, the engineers that are responsible for developing the model systems report are listed, and the time table for its delivery to the facility manager is given.

  7. 41 CFR 300-90.7 - What is the duration of test programs?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 41 Public Contracts and Property Management 4 2014-07-01 2014-07-01 false What is the duration of test programs? 300-90.7 Section 300-90.7 Public Contracts and Property Management Federal Travel Regulation System GENERAL AGENCY REQUIREMENTS 90-TELEWORK TRAVEL EXPENSES TEST PROGRAMS § 300-90.7 What is...

  8. 41 CFR 300-90.8 - What must we do to apply for a test program extension?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 41 Public Contracts and Property Management 4 2014-07-01 2014-07-01 false What must we do to apply for a test program extension? 300-90.8 Section 300-90.8 Public Contracts and Property Management Federal Travel Regulation System GENERAL AGENCY REQUIREMENTS 90-TELEWORK TRAVEL EXPENSES TEST PROGRAMS...

  9. Space station power management and distribution

    NASA Technical Reports Server (NTRS)

    Teren, F.

    1985-01-01

    The power system architecture is presented by a series of schematics which illustrate the power management and distribution (PMAD) system at the component level, including converters, controllers, switchgear, rotary power transfer devices, power and data cables, remote power controllers, and load converters. Power distribution options, reference power management, and control strategy are also outlined. A summary of advanced development status and plans and an overview of system test plans are presented.

  10. Management Control Systems in Not-for-Profit Organizations: A Case Study.

    DTIC Science & Technology

    1982-12-01

    UNCLASSIFIED F/G 5/1 NL mhmmhhhhhmhmmum IEIIEEIIIIIEEE EIIIIIIIIIIIIl Diiit 1.1_I220 H- M141116 MICROCOPY RESOLUION4 TEST CHART 14ATIONAL BUREAU Of... test case. C. RESEARCH RET HODS The first phase of the study was a review of current literature on management control procedures and systems in...RESOLUTION TEST CHART NATIONAL BUREAU 0f SIANDARD 96% A I II a U a .1 ii IiU- I! IA i -~ - U I -..................... I I ~ 3 ,’u!nAA~~ -~~j ~; Eu ~ II 8I~ ~B

  11. Software Quality Metrics: A Software Management Monitoring Method for Air Force Logistics Command in Its Software Quality Assurance Program for the Quantitative Assessment of the System Development Life Cycle under Configuration Management.

    DTIC Science & Technology

    1982-03-01

    pilot systems. Magnitude of the mutant error is classified as: o Program does not compute. o Program computes but does not run test data. o Program...14 Test and Integration ... ............ .. 105 15 The Mapping of SQM to the SDLC ........ ... 108 16 ADS Development .... .............. . 224 17...and funds. While the test phase concludes the normal development cycle, one should realize that with software the development continues in the

  12. Design of biomass management systems and components for closed loop life support systems

    NASA Technical Reports Server (NTRS)

    1991-01-01

    The goal of the EGM 4000/1 Design class was to investigate a Biomass Management System (BMS) and design, fabricate, and test components for biomass management in a closed-loop life support system (CLLSS). The designs explored were to contribute to the development of NASA's Controlled Ecological Life Support System (CELSS) at Kennedy Space Center. Designs included a sectored plant growth unit, a container and transfer mechanism, and an air curtain system for fugitive particle control. The work performed by the class members is summarized.

  13. Information systems as a quality management tool in clinical laboratories

    NASA Astrophysics Data System (ADS)

    Schmitz, Vanessa; Rosecler Bez el Boukhari, Marta

    2007-11-01

    This article describes information systems as a quality management tool in clinical laboratories. The quality of laboratory analyses is of fundamental importance for health professionals in aiding appropriate diagnosis and treatment. Information systems allow the automation of internal quality management processes, using standard sample tests, Levey-Jennings charts and Westgard multirule analysis. This simplifies evaluation and interpretation of quality tests and reduces the possibility of human error. This study proposes the development of an information system with appropriate functions and costs for the automation of internal quality control in small and medium-sized clinical laboratories. To this end, it evaluates the functions and usability of two commercial software products designed for this purpose, identifying the positive features of each, so that these can be taken into account during the development of the proposed system.

  14. The Development and Testing of a Statewide Multilevel Curriculum Management System for Georgia Vocational Education Programs. Curriculum Management Handbook for Vocational Administrators in Comprehensive High Schools, Post-Secondary Area Vocational-Technical Schools and Community College Vocational Programs.

    ERIC Educational Resources Information Center

    Scott, Paul; Moye, Mike

    Developed to assist the building-level administrator in implementing a curriculum management system, this handbook considers two of five duties the vocational administrator must perform to meet the obligations of curriculum management: (1) performing curriculum management functions for the vocational program and (2) implementing and conducting an…

  15. 30 CFR 250.1611 - Blowout preventer systems tests, actuations, inspections, and maintenance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... conducting high-pressure tests, all BOP systems shall be tested to a pressure of 200 to 300 psi. (b) Ram-type BOP's and the choke manifold shall be pressure tested with water to rated working pressure or as otherwise approved by the District Manager. Annular type BOP's shall be pressure tested with water to 70...

  16. 76 FR 27061 - Agency Information Collection Activities; Submission for Office of Management and Budget Review...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-10

    ...] Agency Information Collection Activities; Submission for Office of Management and Budget Review; Comment... Antibacterial Drug Products and Antimicrobial Susceptibility Testing Devices AGENCY: Food and Drug... Systemic Antibacterial Drug Products and Antimicrobial Susceptibility Testing Devices--(OMB Control Number...

  17. Ada Compiler Validation Summary Report: Certificate Number: 940630W1. 11372 Rational Software Corporation VADS System V/88 Release 4, VAda-110-8484, Product Number: 2100-01464, Version 6.2 DG AViiON G70592-A (M88110) under UNIX System V Release 4

    DTIC Science & Technology

    1994-07-21

    InforMation Systems Agency, Center for Information Management DECLARATION OF CONFORMANCE The following declaration of conformance was supplied by the...services such as resource allocation, scheduling, inp•t/outp-it control, and data management. Usually, operating systems are predominantly software...Ada programming language. 1-4 CHAPTER 2 IMPLEMMTION DEPENDENC IES 2.1 WITHDRAWN TESTS The f3llowing tests have been withdrawn by the AVO. The

  18. Implementation of the integrated management of childhood illness with parasitological diagnosis of malaria in rural Ghana: health worker perceptions.

    PubMed

    Febir, Lawrence G; Baiden, Frank E; Agula, Justina; Delimini, Rupert K; Akpalu, Bright; Tivura, Mathilda; Amanfo, Nelson; Chandramohan, Daniel; Owusu-Agyei, Seth; Webster, Jayne

    2015-04-23

    Timely and appropriate management of febrile illness among children under five years of age will contribute to achieving Millennium Development Goal-4. The revised World Health Organization-Global Malaria Programme's policy on test-based management of malaria must integrate effectively into the Integrated Management of Childhood Illness (IMCI). This study reports on perceptions of health workers on the health system factors influencing effective delivery of test-based diagnosis of malaria with IMCI. A qualitative study was conducted among a range of health workers at different levels of the health system in the Brong Ahafo Region of Ghana. Interview transcripts were transferred into Nvivo 8 software for data management and analysis. A frame-work approach at two levels was used in the analysis, which included the processes required for implementation of test-based management of malaria and the health systems context. Forty-nine in-depth interviews were conducted. The National Health Insurance Scheme (NHIS) was perceived to have led to an increase in health facility attendance, thereby increasing the workload of health workers. Workload was reported as the main reason that health workers were not able to complete all of the examinations included in the IMCI algorithm. The NHIS financing guidelines were seen to be determining diagnosis and treatment practices by health-care givers. Concern was expressed about the erratic supply of malaria rapid diagnostic test kits (RDTs), the quality of RDTs related to potential false negative results when clinical symptoms were consistent with malaria. IMCI was seen as important but practically impossible to fully implement due to workload. Implementation of the WHO-revised IMCI guideline is confronted with a myriad of health systems challenges. The perceptions of front-line health workers on the accuracy and need for RDTs together with the capacity of health systems to support implementation plays a crucial role. The NHIS financing guidelines of diagnostics and treatments are influencing clinical decision-making in this setting. Further study is needed to understand the impact of the NHIS on the feasibility of integrating test-based management for malaria into the IMCI guidelines.

  19. Data Management for Mars Exploration Rovers

    NASA Technical Reports Server (NTRS)

    Snyder, Joseph F.; Smyth, David E.

    2004-01-01

    Data Management for the Mars Exploration Rovers (MER) project is a comprehensive system addressing the needs of development, test, and operations phases of the mission. During development of flight software, including the science software, the data management system can be simulated using any POSIX file system. During testing, the on-board file system can be bit compared with files on the ground to verify proper behavior and end-to-end data flows. During mission operations, end-to-end accountability of data products is supported, from science observation concept to data products within the permanent ground repository. Automated and human-in-the-loop ground tools allow decisions regarding retransmitting, re-prioritizing, and deleting data products to be made using higher level information than is available to a protocol-stack approach such as the CCSDS File Delivery Protocol (CFDP).

  20. Test, Control and Monitor System (TCMS) operations plan

    NASA Technical Reports Server (NTRS)

    Macfarlane, C. K.; Conroy, M. P.

    1993-01-01

    The purpose is to provide a clear understanding of the Test, Control and Monitor System (TCMS) operating environment and to describe the method of operations for TCMS. TCMS is a complex and sophisticated checkout system focused on support of the Space Station Freedom Program (SSFP) and related activities. An understanding of the TCMS operating environment is provided and operational responsibilities are defined. NASA and the Payload Ground Operations Contractor (PGOC) will use it as a guide to manage the operation of the TCMS computer systems and associated networks and workstations. All TCMS operational functions are examined. Other plans and detailed operating procedures relating to an individual operational function are referenced within this plan. This plan augments existing Technical Support Management Directives (TSMD's), Standard Practices, and other management documentation which will be followed where applicable.

  1. A Database System for Course Administration.

    ERIC Educational Resources Information Center

    Benbasat, Izak; And Others

    1982-01-01

    Describes a computer-assisted testing system which produces multiple-choice examinations for a college course in business administration. The system uses SPIRES (Stanford Public Information REtrieval System) to manage a database of questions and related data, mark-sense cards for machine grading tests, and ACL (6) (Audit Command Language) to…

  2. [Compatibility of different quality control systems].

    PubMed

    Invernizzi, Enrico

    2002-01-01

    Management of the good laboratory practice (GLP) quality system presupposes its linking to a basic recognized and approved quality system, from which it can draw on management procedures common to all quality systems, such as the ISO 9000 set of norms. A quality system organized in this way can also be integrated with other dedicated quality systems, or parts of them, to obtain principles or management procedures for specific topics. The aim of this organization is to set up a reliable, recognized quality system compatible with the principles of GLP and other quality management systems, which provides users with a simplified set of easily accessible management tools and answers. The organization of this quality system is set out in the quality assurance programme, which is actually the document in which the test facility incorporates the GLP principles into its own quality organization.

  3. Unmanned Aircraft Systems Traffic Management (UTM) Safely Enabling UAS Operations in Low-Altitude Airspace

    NASA Technical Reports Server (NTRS)

    Kopardekar, Parimal H.

    2017-01-01

    Conduct research, development and testing to identify airspace operations requirements to enable large-scale visual and beyond visual line of sight UAS operations in the low-altitude airspace. Use build-a-little-test-a-little strategy remote areas to urban areas Low density: No traffic management required but understanding of airspace constraints. Cooperative traffic management: Understanding of airspace constraints and other operations. Manned and unmanned traffic management: Scalable and heterogeneous operations. UTM construct consistent with FAAs risk-based strategy. UTM research platform is used for simulations and tests. UTM offers path towards scalability

  4. [Laboratory accreditation and proficiency testing].

    PubMed

    Kuwa, Katsuhiko

    2003-05-01

    ISO/TC 212 covering clinical laboratory testing and in vitro diagnostic test systems will issue the international standard for medical laboratory quality and competence requirements, ISO 15189. This standard is based on the ISO/IEC 17025, general requirements for competence of testing and calibration laboratories and ISO 9001, quality management systems-requirements. Clinical laboratory services are essential to patient care and therefore should be available to meet the needs of all patients and clinical personnel responsible for human health care. If a laboratory seeks accreditation, it should select an accreditation body that operates according to this international standard and in a manner which takes into account the particular requirements of clinical laboratories. Proficiency testing should be available to evaluate the calibration laboratories and reference measurement laboratories in clinical medicine. Reference measurement procedures should be of precise and the analytical principle of measurement applied should ensure reliability. We should be prepared to establish a quality management system and proficiency testing in clinical laboratories.

  5. Development and Implementation of a Hardware In-the-Loop Test Bed for Unmanned Aerial Vehicle Control Algorithms

    NASA Technical Reports Server (NTRS)

    Nyangweso, Emmanuel; Bole, Brian

    2014-01-01

    Successful prediction and management of battery life using prognostic algorithms through ground and flight tests is important for performance evaluation of electrical systems. This paper details the design of test beds suitable for replicating loading profiles that would be encountered in deployed electrical systems. The test bed data will be used to develop and validate prognostic algorithms for predicting battery discharge time and battery failure time. Online battery prognostic algorithms will enable health management strategies. The platform used for algorithm demonstration is the EDGE 540T electric unmanned aerial vehicle (UAV). The fully designed test beds developed and detailed in this paper can be used to conduct battery life tests by controlling current and recording voltage and temperature to develop a model that makes a prediction of end-of-charge and end-of-life of the system based on rapid state of health (SOH) assessment.

  6. National remote computational flight research facility

    NASA Technical Reports Server (NTRS)

    Rediess, Herman A.

    1989-01-01

    The extension of the NASA Ames-Dryden remotely augmented vehicle (RAV) facility to accommodate flight testing of a hypersonic aircraft utilizing the continental United States as a test range is investigated. The development and demonstration of an automated flight test management system (ATMS) that uses expert system technology for flight test planning, scheduling, and execution is documented.

  7. Cryogenic testing of Planck sorption cooler test facility

    NASA Technical Reports Server (NTRS)

    Zhang, B.; Pearson, D.; Borders, J.; Franklin, B.; Prina, M.; Hardy, J.; Crumb, D.

    2004-01-01

    A test facility has been upgraded in preparation for testing of two hydrogen sorption cryocoolers operating at 18/20 K. these sorption coolers are currently under development at the Jet Propulsion Laboratory. This work summarizes the scope of the test facility upgrade, including design for cryogenic cooling power delivery, system thermal management, insulation schemes, and data acquisition techniques. Ground support equipment for the sorption coolers, structural features of the test chamber, and the vacuum system involved for system testing will also be described in detail.

  8. Research on the full life cycle management system of smart electric energy meter

    NASA Astrophysics Data System (ADS)

    Chen, Xiangqun; Huang, Rui; Shen, Liman; Guo, Dingying; Xiong, Dezhi; Xiao, Xiangqi; Liu, Mouhai; Renheng, Xu

    2018-02-01

    At present, China’s smart electric energy meter life management is started from the procurement and acceptance. The related monitoring and management of the manufacturing sector has not yet been carried out. This article applies RFID technology and network cloud platform to full life cycle management system of smart electric energy meters, builds this full life cycle management system including design and manufacturing, process control, measurement and calibration testing, storage management, user acceptance, site operation, maintenance scrap and other aspects. Exploring smart electric energy meters on-line and off-line communication by the application of active RFID communication functions, and the actual functional application such as local data exchange and instrument calibration. This system provides technical supports on power demand side management and the improvement of smart electric energy meter reliability evaluation system.

  9. The Architecture Design of Detection and Calibration System for High-voltage Electrical Equipment

    NASA Astrophysics Data System (ADS)

    Ma, Y.; Lin, Y.; Yang, Y.; Gu, Ch; Yang, F.; Zou, L. D.

    2018-01-01

    With the construction of Material Quality Inspection Center of Shandong electric power company, Electric Power Research Institute takes on more jobs on quality analysis and laboratory calibration for high-voltage electrical equipment, and informationization construction becomes urgent. In the paper we design a consolidated system, which implements the electronic management and online automation process for material sampling, test apparatus detection and field test. In the three jobs we use QR code scanning, online Word editing and electronic signature. These techniques simplify the complex process of warehouse management and testing report transferring, and largely reduce the manual procedure. The construction of the standardized detection information platform realizes the integrated management of high-voltage electrical equipment from their networking, running to periodic detection. According to system operation evaluation, the speed of transferring report is doubled, and querying data is also easier and faster.

  10. Central Inertial and GPS Test Facility (CIGTF) Customer Handbook

    DTIC Science & Technology

    2007-08-01

    capabilities offer the customer a cost-effective means to evaluate their guidance and navigation systems. The 746 TS also manages the tri-service GPS...minimum your test manager ur test or current phase of testing is complete. 4.0 Customer Feedback The 746 TS works very hard to provide its customers ... Customer Handbook August 2007 HOLLOMAN AFB, NEW MEXICO Distribution Statement A Approved for public release: distribution is

  11. Energy Systems Test Area (ESTA) Pyrotechnic Operations: User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    Hacker, Scott

    2012-01-01

    The Johnson Space Center (JSC) has created and refined innovative analysis, design, development, and testing techniques that have been demonstrated in all phases of spaceflight. JSC is uniquely positioned to apply this expertise to components, systems, and vehicles that operate in remote or harsh environments. We offer a highly skilled workforce, unique facilities, flexible project management, and a proven management system. The purpose of this guide is to acquaint Test Requesters with the requirements for test, analysis, or simulation services at JSC. The guide includes facility services and capabilities, inputs required by the facility, major milestones, a roadmap of the facility s process, and roles and responsibilities of the facility and the requester. Samples of deliverables, facility interfaces, and inputs necessary to define the cost and schedule are included as appendices to the guide.

  12. Space station data management system - A common GSE test interface for systems testing and verification

    NASA Technical Reports Server (NTRS)

    Martinez, Pedro A.; Dunn, Kevin W.

    1987-01-01

    This paper examines the fundamental problems and goals associated with test, verification, and flight-certification of man-rated distributed data systems. First, a summary of the characteristics of modern computer systems that affect the testing process is provided. Then, verification requirements are expressed in terms of an overall test philosophy for distributed computer systems. This test philosophy stems from previous experience that was gained with centralized systems (Apollo and the Space Shuttle), and deals directly with the new problems that verification of distributed systems may present. Finally, a description of potential hardware and software tools to help solve these problems is provided.

  13. Using a data base management system for modelling SSME test history data

    NASA Technical Reports Server (NTRS)

    Abernethy, K.

    1985-01-01

    The usefulness of a data base management system (DBMS) for modelling historical test data for the complete series of static test firings for the Space Shuttle Main Engine (SSME) was assessed. From an analysis of user data base query requirements, it became clear that a relational DMBS which included a relationally complete query language would permit a model satisfying the query requirements. Representative models and sample queries are discussed. A list of environment-particular evaluation criteria for the desired DBMS was constructed; these criteria include requirements in the areas of user-interface complexity, program independence, flexibility, modifiability, and output capability. The evaluation process included the construction of several prototype data bases for user assessement. The systems studied, representing the three major DBMS conceptual models, were: MIRADS, a hierarchical system; DMS-1100, a CODASYL-based network system; ORACLE, a relational system; and DATATRIEVE, a relational-type system.

  14. Apollo Soyuz Test Project Weights and Mass Properties Operational Management System

    NASA Technical Reports Server (NTRS)

    Collins, M. A., Jr.; Hischke, E. R.

    1975-01-01

    The Apollo Soyuz Test Project (ASTP) Weights and Mass Properties Operational Management System was established to assure a timely and authoritative method of acquiring, controlling, generating, and disseminating an official set of vehicle weights and mass properties data. This paper provides an overview of the system and its interaction with the various aspects of vehicle and component design, mission planning, hardware and software simulations and verification, and real-time mission support activities. The effect of vehicle configuration, design maturity, and consumables updates is discussed in the context of weight control.

  15. TEX-SIS FOLLOW-UP: Student Follow-up Management Information System. Activities Manual.

    ERIC Educational Resources Information Center

    Tarrant County Junior Coll. District, Ft. Worth, TX.

    Project FOLLOW-UP was conducted to develop, test, and validate a statewide management information system for follow-up of Texas public junior and community college students. This activities manual provides an overview of the resultant student information system (TEX-SIS) and its characteristics. Seven subsystems comprise SIS, each with its own…

  16. Selecting a Relational Database Management System for Library Automation Systems.

    ERIC Educational Resources Information Center

    Shekhel, Alex; O'Brien, Mike

    1989-01-01

    Describes the evaluation of four relational database management systems (RDBMSs) (Informix Turbo, Oracle 6.0 TPS, Unify 2000 and Relational Technology's Ingres 5.0) to determine which is best suited for library automation. The evaluation criteria used to develop a benchmark specifically designed to test RDBMSs for libraries are discussed. (CLB)

  17. Power Extension Package (PEP) system definition extension, orbital service module systems analysis study. Volume 12: PEP data item descriptions

    NASA Technical Reports Server (NTRS)

    1979-01-01

    Contractor information requirements necessary to support the power extension package project of the space shuttle program are specified for the following categories of data: project management; configuration management; systems engineering and test; manufacturing; reliability, quality assurance and safety; logistics; training; and operations.

  18. Security-Enhanced Autonomous Network Management

    NASA Technical Reports Server (NTRS)

    Zeng, Hui

    2015-01-01

    Ensuring reliable communication in next-generation space networks requires a novel network management system to support greater levels of autonomy and greater awareness of the environment and assets. Intelligent Automation, Inc., has developed a security-enhanced autonomous network management (SEANM) approach for space networks through cross-layer negotiation and network monitoring, analysis, and adaptation. The underlying technology is bundle-based delay/disruption-tolerant networking (DTN). The SEANM scheme allows a system to adaptively reconfigure its network elements based on awareness of network conditions, policies, and mission requirements. Although SEANM is generically applicable to any radio network, for validation purposes it has been prototyped and evaluated on two specific networks: a commercial off-the-shelf hardware test-bed using Institute of Electrical Engineers (IEEE) 802.11 Wi-Fi devices and a military hardware test-bed using AN/PRC-154 Rifleman Radio platforms. Testing has demonstrated that SEANM provides autonomous network management resulting in reliable communications in delay/disruptive-prone environments.

  19. The development of an airborne information management system for flight test

    NASA Technical Reports Server (NTRS)

    Bever, Glenn A.

    1992-01-01

    An airborne information management system is being developed at the NASA Dryden Flight Research Facility. This system will improve the state of the art in management data acquisition on-board research aircraft. The design centers around highly distributable, high-speed microprocessors that allow data compression, digital filtering, and real-time analysis. This paper describes the areas of applicability, approach to developing the system, potential for trouble areas, and reasons for this development activity. System architecture (including the salient points of what makes it unique), design philosophy, and tradeoff issues are also discussed.

  20. 46 CFR Appendix A - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 1 2010-10-01 2010-10-01 false [Reserved] A Appendix A Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY MERCHANT MARINE OFFICERS AND SEAMEN CHEMICAL TESTING Management Information System Management Information System requirements. Appendix A [Reserved] 46 CFR Ch. I (10-1-10 Edition...

  1. Using Executive Information Systems to Manage Capital Projects and Facilities.

    ERIC Educational Resources Information Center

    Kaynor, Robert

    1993-01-01

    In higher education, facilities data are essential for long-term capital and financial planning and for testing assumptions underlying anticipated policy change. Executive information systems should incorporate life-cycle considerations (planning, construction, renovation, and management) and resource linkages (describing interrelationships of…

  2. Integrated corridor management initiative : demonstration phase evaluation, San Diego decision support system analysis test plan.

    DOT National Transportation Integrated Search

    2000-01-01

    This report demonstrates the benefits and potential pitfalls of deploying and operating an integrated freeway and arterial management system. In particular, it discusses the lessons learned about the Medical Center Corridor (MCC) Project deployed in ...

  3. Los Angeles congestion reduction demonstration (Metro ExpressLanes) program. National evaluation : ridesharing data test plan.

    DOT National Transportation Integrated Search

    1997-10-01

    The ITS infrastructure allows the surface transportation system to be managed as a seamless, intermodal, multi-jurisdictional entity, and appears to the public as a seamless system. It does so by integrating transportation and management information ...

  4. Richardson Instructional Management System (RIMS). How to Blend a Computerized Objectives-Referenced Testing System, Distributive Data Processing, and Systemwide Evaluation.

    ERIC Educational Resources Information Center

    Riegel, N. Blyth

    Recent changes in the structure of curriculum and the instructional system in Texas have required a major reorganization of teaching, evaluating, budgeting, and planning activities in the local education agencies, which has created the need for a database. The history of Richardson Instructional Management System (RIMS), its data processing…

  5. Optical mass memory system (AMM-13). AMM/DBMS interface control document

    NASA Technical Reports Server (NTRS)

    Bailey, G. A.

    1980-01-01

    The baseline for external interfaces of a 10 to the 13th power bit, optical archival mass memory system (AMM-13) is established. The types of interfaces addressed include data transfer; AMM-13, Data Base Management System, NASA End-to-End Data System computer interconnect; data/control input and output interfaces; test input data source; file management; and facilities interface.

  6. Vibroacoustic Payload Environment Prediction System (VAPEPS): VAPEPS management center remote access guide

    NASA Technical Reports Server (NTRS)

    Fernandez, J. P.; Mills, D.

    1991-01-01

    A Vibroacoustic Payload Environment Prediction System (VAPEPS) Management Center was established at the JPL. The center utilizes the VAPEPS software package to manage a data base of Space Shuttle and expendable launch vehicle payload flight and ground test data. Remote terminal access over telephone lines to the computer system, where the program resides, was established to provide the payload community a convenient means of querying the global VAPEPS data base. This guide describes the functions of the VAPEPS Management Center and contains instructions for utilizing the resources of the center.

  7. Workarounds and Test Results Follow-up in Electronic Health Record-Based Primary Care.

    PubMed

    Menon, Shailaja; Murphy, Daniel R; Singh, Hardeep; Meyer, Ashley N D; Sittig, Dean F

    2016-01-01

    Electronic health records (EHRs) have potential to facilitate reliable communication and follow-up of test results. However, limitations in EHR functionality remain, leading practitioners to use workarounds while managing test results. Workarounds can lead to patient safety concerns and signify indications as to how to build better EHR systems that meet provider needs. To understand why primary care practitioners (PCPs) use workarounds to manage test results by analyzing data from a previously conducted national cross-sectional survey on test result management. We conducted a secondary data analysis of quantitative and qualitative data from a national survey of PCPs practicing in the Department of Veterans Affairs (VA) and explored the use of workarounds in test results management. We used multivariate logistic regression analysis to examine the association between key sociotechnical factors that could affect test results follow-up (e.g., both technology-related and those unrelated to technology, such as organizational support for patient notification) and workaround use. We conducted a qualitative content analysis of free text survey data to examine reasons for use of workarounds. Of 2554 survey respondents, 1104 (43%) reported using workarounds related to test results management. Of these 1028 (93%) described the type of workaround they were using; 719 (70%) reported paper-based methods, while 230 (22%) used a combination of paper- and computer-based workarounds. Primary care practitioners who self-reported limited administrative support to help them notify patients of test results or described an instance where they personally (or a colleague) missed results, were more likely to use workarounds (p=0.02 and p=0.001, respectively). Qualitative analysis identified three main reasons for workaround use: 1) as a memory aid, 2) for improved efficiency and 3) for facilitating internal and external care coordination. Workarounds to manage EHR-based test results are common, and their use results from unmet provider information management needs. Future EHRs and the respective work systems around them need to evolve to meet these needs.

  8. ENVIRONMENTAL DATA MANAGEMENT IN SUPPORT OF SHARING DATA AND MANAGEMENT

    EPA Science Inventory

    A data management system (DMS) was developed, tested and demonstrated to store and manage water quality and quantity (WQ2) data pertaining to U.S. Environmental Protection Agency/Office of Research and Development (EPA/ORD) research projects in standardized formats. This approach...

  9. LIMS user acceptance testing.

    PubMed

    Klein, Corbett S

    2003-01-01

    Laboratory Information Management Systems (LIMS) play a key role in the pharmaceutical industry. Thorough and accurate validation of such systems is critical and is a regulatory requirement. LIMS user acceptance testing is one aspect of this testing and enables the user to make a decision to accept or reject implementation of the system. This paper discusses key elements in facilitating the development and execution of a LIMS User Acceptance Test Plan (UATP).

  10. First Experiences with CMS Data Storage on the GEMSS System at the INFN-CNAF Tier-1

    NASA Astrophysics Data System (ADS)

    Andreotti, D.; Bonacorsi, D.; Cavalli, A.; Pra, S. Dal; Dell'Agnello, L.; Forti, Alberto; Grandi, C.; Gregori, D.; Gioi, L. Li; Martelli, B.; Prosperini, A.; Ricci, P. P.; Ronchieri, Elisabetta; Sapunenko, V.; Sartirana, A.; Vagnoni, V.; Zappi, Riccardo

    A brand new Mass Storage System solution called "Grid-Enabled Mass Storage System" (GEMSS) -based on the Storage Resource Manager (StoRM) developed by INFN, on the General Parallel File System by IBM and on the Tivoli Storage Manager by IBM -has been tested and deployed at the INFNCNAF Tier-1 Computing Centre in Italy. After a successful stress test phase, the solution is now being used in production for the data custodiality of the CMS experiment at CNAF. All data previously recorded on the CASTOR system have been transferred to GEMSS. As final validation of the GEMSS system, some of the computing tests done in the context of the WLCG "Scale Test for the Experiment Program" (STEP'09) challenge were repeated in September-October 2009 and compared with the results previously obtained with CASTOR in June 2009. In this paper, the GEMSS system basics, the stress test activity and the deployment phase -as well as the reliability and performance of the system -are overviewed. The experiences in the use of GEMSS at CNAF in preparing for the first months of data taking of the CMS experiment at the Large Hadron Collider are also presented.

  11. 30 CFR 250.1625 - Blowout preventer system testing, records, and drills.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... drills. 250.1625 Section 250.1625 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, REGULATION, AND... SHELF Sulphur Operations § 250.1625 Blowout preventer system testing, records, and drills. (a) Prior to... manifold valves, upper and lower kelly cocks, and drill-string safety valves shall be pressure tested to...

  12. Evaluation and Management of Patch Test-Negative Patients With Generalized Dermatitis.

    PubMed

    Spiker, Alison; Mowad, Christen M

    Patients with generalized dermatitis are common in dermatology practices. Allergic contact dermatitis is often suspected, and patients frequently undergo patch testing. When the patch testing result is negative, further evaluation and management of these patients are challenging. The purpose of this study was to survey members of the American Contact Dermatitis Society regarding the evaluation and management of patch test-negative patients with generalized dermatitis. Generalized dermatitis was the most common term identified for patch test-negative patients with diffuse dermatitis. After having negative expanded patch testing results, most physicians proceeded with additional testing including skin biopsy, complete blood cell count with differential, and liver and renal function tests. The most commonly used systemic treatment is prednisone, followed by methotrexate. Narrow-band ultraviolet B (UVB) is the most commonly used light source. Antihistamines are frequently prescribed. Food allergy is not felt to be causative. This cohort of patients experiences significant impairment in quality of life, stress on personal relationships, and time off work. The management of patch test-negative patients with generalized dermatitis is challenging. This study provides insight into management of these complex patients. It also demonstrates practice gaps in the management of these patients, indicating a need for further studies to direct the evaluation and management of this patient population.

  13. Feasibility testing of a web-based symptom self-management system for persons living with HIV.

    PubMed

    Schnall, Rebecca; Wantland, Dean; Velez, Olivia; Cato, Kenrick; Jia, Haomiao

    2014-01-01

    The purpose of this study was to explore the feasibility of using a Web-based tool to provide tailored symptom management strategies for persons living with HIV (PLWH) and to estimate the effect size of the tool for future studies. Testing the components of the Web-based system was done by incorporating a repeated-measures design measuring the outcomes of symptom frequency and intensity, use of symptom management strategies, and engagement with health care providers. We recruited 42 PLWH; participants were enrolled in the study for 12 weeks and were asked to use the system and complete the questionnaires every 2 weeks. Our results showed that participants who used the strategies were more likely to have a decrease in symptom frequency and intensity. Findings from this feasibility study provide preliminary evidence for the use of a Web-based HIV symptom management tool with self-management strategies for individuals living with HIV infection. Copyright © 2014 Association of Nurses in AIDS Care. Published by Elsevier Inc. All rights reserved.

  14. Quality Management Systems Implementation Compared With Organizational Maturity in Hospital.

    PubMed

    Moradi, Tayebeh; Jafari, Mehdi; Maleki, Mohammad Reza; Naghdi, Seyran; Ghiasvand, Hesam

    2015-07-27

    A quality management system can provide a framework for continuous improvement in order to increase the probability of customers and other stakeholders' satisfaction. The test maturity model helps organizations to assess the degree of maturity in implementing effective and sustained quality management systems; plan based on the current realities of the organization and prioritize their improvement programs. We aim to investigate and compare the level of organizational maturity in hospitals with the status of quality management systems implementation. This analytical cross sectional study was conducted among hospital administrators and quality experts working in hospitals with over 200 beds located in Tehran. In the first step, 32 hospitals were selected and then 96 employees working in the selected hospitals were studied. The data were gathered using the implementation checklist of quality management systems and the organization maturity questionnaire derived from ISO 10014. The content validity was calculated using Lawshe method and the reliability was estimated using test - retest method and calculation of Cronbach's alpha coefficient. The descriptive and inferential statistics were used to analyze the data using SPSS 18 software. According to the table, the mean score of organizational maturity among hospitals in the first stage of quality management systems implementation was equal to those in the third stage and hypothesis was rejected (p-value = 0.093). In general, there is no significant difference in the organizational maturity between the first and third level hospitals (in terms of implementation of quality management systems). Overall, the findings of the study show that there is no significant difference in the organizational maturity between the hospitals in different levels of the quality management systems implementation and in fact, the maturity of the organizations cannot be attributed to the implementation of such systems. As a result, hospitals should make changes in the quantity and quality of quality management systems in an effort to increase organizational maturity, whereby they improve the hospital efficiency and productivity.

  15. Quality Management Systems Implementation Compared With Organizational Maturity in Hospital

    PubMed Central

    Moradi, Tayebeh; Jafari, Mehdi; Maleki, Mohammad Reza; Naghdi, Seyran; Ghiyasvand, Hesam

    2016-01-01

    Background: A quality management system can provide a framework for continuous improvement in order to increase the probability of customers and other stakeholders’ satisfaction. The test maturity model helps organizations to assess the degree of maturity in implementing effective and sustained quality management systems; plan based on the current realities of the organization and prioritize their improvement programs. Objectives: We aim to investigate and compare the level of organizational maturity in hospitals with the status of quality management systems implementation. Materials and Methods: This analytical cross sectional study was conducted among hospital administrators and quality experts working in hospitals with over 200 beds located in Tehran. In the first step, 32 hospitals were selected and then 96 employees working in the selected hospitals were studied. The data were gathered using the implementation checklist of quality management systems and the organization maturity questionnaire derived from ISO 10014. The content validity was calculated using Lawshe method and the reliability was estimated using test - retest method and calculation of Cronbach's alpha coefficient. The descriptive and inferential statistics were used to analyze the data using SPSS 18 software. Results: According to the table, the mean score of organizational maturity among hospitals in the first stage of quality management systems implementation was equal to those in the third stage and hypothesis was rejected (p-value = 0.093). In general, there is no significant difference in the organizational maturity between the first and third level hospitals (in terms of implementation of quality management systems). Conclusions: Overall, the findings of the study show that there is no significant difference in the organizational maturity between the hospitals in different levels of the quality management systems implementation and in fact, the maturity of the organizations cannot be attributed to the implementation of such systems. As a result, hospitals should make changes in the quantity and quality of quality management systems in an effort to increase organizational maturity, whereby they improve the hospital efficiency and productivity. PMID:26493411

  16. An Evaluation of a Computer-Based Videotext Information Delivery System for Farmers: The Green Thumb Project.

    ERIC Educational Resources Information Center

    Warner, Paul D.; Clearfield, Frank

    The Green Thumb Project was designed to test the feasibility of operating a computerized system for disseminating weather, market, and other agricultural production and management information on a day-to-day basis; to develop a prototype software support system for the test; and to provide essential project information on conduct of the test to…

  17. Systems Engineering, Quality and Testing

    NASA Technical Reports Server (NTRS)

    Shepherd, Christena C.

    2015-01-01

    AS9100 has little to say about how to apply a Quality Management System (QMS) to aerospace test programs. There is little in the quality engineering Body of Knowledge that applies to testing, unless it is nondestructive examination or some type of lab or bench testing. If one examines how the systems engineering processes are implemented throughout a test program; and how these processes can be mapped to AS9100, a number of areas for involvement of the quality professional are revealed.

  18. Bringing the CMS distributed computing system into scalable operations

    NASA Astrophysics Data System (ADS)

    Belforte, S.; Fanfani, A.; Fisk, I.; Flix, J.; Hernández, J. M.; Kress, T.; Letts, J.; Magini, N.; Miccio, V.; Sciabà, A.

    2010-04-01

    Establishing efficient and scalable operations of the CMS distributed computing system critically relies on the proper integration, commissioning and scale testing of the data and workload management tools, the various computing workflows and the underlying computing infrastructure, located at more than 50 computing centres worldwide and interconnected by the Worldwide LHC Computing Grid. Computing challenges periodically undertaken by CMS in the past years with increasing scale and complexity have revealed the need for a sustained effort on computing integration and commissioning activities. The Processing and Data Access (PADA) Task Force was established at the beginning of 2008 within the CMS Computing Program with the mandate of validating the infrastructure for organized processing and user analysis including the sites and the workload and data management tools, validating the distributed production system by performing functionality, reliability and scale tests, helping sites to commission, configure and optimize the networking and storage through scale testing data transfers and data processing, and improving the efficiency of accessing data across the CMS computing system from global transfers to local access. This contribution reports on the tools and procedures developed by CMS for computing commissioning and scale testing as well as the improvements accomplished towards efficient, reliable and scalable computing operations. The activities include the development and operation of load generators for job submission and data transfers with the aim of stressing the experiment and Grid data management and workload management systems, site commissioning procedures and tools to monitor and improve site availability and reliability, as well as activities targeted to the commissioning of the distributed production, user analysis and monitoring systems.

  19. A computer-managed undergraduate physics laboratory

    NASA Astrophysics Data System (ADS)

    Kalman, C. S.

    1987-01-01

    Seventeen one-semester undergraduate laboratory courses are managed by a microcomputer system at Concordia University. Students may perform experiments at any time during operating hours. The computer administers pre- and post-tests. Considerable savings in manpower costs is achieved. The system also provides many pedagogical advantages.

  20. Bethany Sparn | NREL

    Science.gov Websites

    Sparn Photo of Bethany Sparn Bethany Sparn Researcher IV-Systems Engineering Bethany.Sparn@nrel.gov , residential HVAC equipment, heat pump water heaters, automated home energy management devices, and whole-house Energy Systems Integration Facility which provides a test bed for evaluating home energy management

  1. Development and Testing of a Prototype Connected Vehicle Wrong-Way Driving Detection and Management System

    DOT National Transportation Integrated Search

    2018-02-01

    The primary objective of Phase II was to develop a prototype connected vehicle wrong-way driving detection and management system at the Texas A&M University Respect, Excellence, Leadership, Loyalty, Integrity, Selfless Service (RELLIS) campus. The pu...

  2. Knowledge management systems success in healthcare: Leadership matters.

    PubMed

    Ali, Nor'ashikin; Tretiakov, Alexei; Whiddett, Dick; Hunter, Inga

    2017-01-01

    To deliver high-quality healthcare doctors need to access, interpret, and share appropriate and localised medical knowledge. Information technology is widely used to facilitate the management of this knowledge in healthcare organisations. The purpose of this study is to develop a knowledge management systems success model for healthcare organisations. A model was formulated by extending an existing generic knowledge management systems success model by including organisational and system factors relevant to healthcare. It was tested by using data obtained from 263 doctors working within two district health boards in New Zealand. Of the system factors, knowledge content quality was found to be particularly important for knowledge management systems success. Of the organisational factors, leadership was the most important, and more important than incentives. Leadership promoted knowledge management systems success primarily by positively affecting knowledge content quality. Leadership also promoted knowledge management use for retrieval, which should lead to the use of that better quality knowledge by the doctors, ultimately resulting in better outcomes for patients. Copyright © 2016 Elsevier Ireland Ltd. All rights reserved.

  3. WIS Implementation Study Report. Volume 2. Resumes.

    DTIC Science & Technology

    1983-10-01

    WIS modernization that major attention be paid to interface definition and design, system integra- tion and test , and configuration management of the...Estimates -- Computer Corporation of America -- 155 Test Processing Systems -- Newburyport Computer Associates, Inc. -- 183 Cluster II Papers-- Standards...enhancements of the SPL/I compiler system, development of test systems for the verification of SDEX/M and the timing and architecture of the AN/U YK-20 and

  4. Large increase in opportunistic testing for chlamydia during a pilot project in a primary health organisation.

    PubMed

    Azariah, Sunita; McKernon, Stephen; Werder, Suzanne

    2013-06-01

    The Auckland chlamydia pilot project was one of three funded by the Ministry of Health to trial implementation of the 2008 Chlamydia Management Guidelines. Chlamydia is the most commonly notified sexually transmitted infection in New Zealand. To increase opportunistic testing in under-25-year-olds and to improve documentation of partner notification in primary care. A four-month pilot was initiated in Total Healthcare Otara using a nurse-led approach. Laboratory testing data was analysed to assess whether the pilot had any impact on chlamydia testing volumes in the target age-group. Data entered in the practice management system was used to assess follow-up and management of chlamydia cases. During the pilot there was a 300% increase in the number of chlamydia tests in the target age group from 812 to 2410 and the number of male tests increased by nearly 500%. Twenty-four percent of people tested were positive for chlamydia, with no significant difference in prevalence by ethnicity. The pilot resulted in better documentation of patient follow-up in the patient management system. There was a large increase in chlamydia testing during the pilot with a high prevalence found in the population tested. Chlamydia remains an important health problem in New Zealand. The cost benefit of increased chlamydia screening at a population level has yet to be established.

  5. Proceedings of the drug testing laboratory managers symposium, 28 January--1 February 1974. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Noe, E.R.; Romanchick, W.A.; Ainsworth, C.A. III

    1975-06-01

    This report deals with broad concepts of managing mass screening programs for drugs of abuse; e.g., morphine, barbiturate, amphetamine, cocaine, and methaqualone. The interactions of the screening process and of the rehabilitation program were covered. Psychotherapy and group therapy are both utilized in rehabilitation programs. The semiautomated radioimmunoassay (RIA) screening procedures are both sensitive and specific at nanogram quantities. Future evaluations of a wafer disk transferral system and of a latex test for morphine are presented. The unique quality control system employed by military drug abuse testing laboratories is discussed. (Author) (GRA)

  6. System hazards in managing laboratory test requests and results in primary care: medical protection database analysis and conceptual model.

    PubMed

    Bowie, Paul; Price, Julie; Hepworth, Neil; Dinwoodie, Mark; McKay, John

    2015-11-27

    To analyse a medical protection organisation's database to identify hazards related to general practice systems for ordering laboratory tests, managing test results and communicating test result outcomes to patients. To integrate these data with other published evidence sources to inform design of a systems-based conceptual model of related hazards. A retrospective database analysis. General practices in the UK and Ireland. 778 UK and Ireland general practices participating in a medical protection organisation's clinical risk self-assessment (CRSA) programme from January 2008 to December 2014. Proportion of practices with system risks; categorisation of identified hazards; most frequently occurring hazards; development of a conceptual model of hazards; and potential impacts on health, well-being and organisational performance. CRSA visits were undertaken to 778 UK and Ireland general practices of which a range of systems hazards were recorded across the laboratory test ordering and results management systems in 647 practices (83.2%). A total of 45 discrete hazard categories were identified with a mean of 3.6 per practice (SD=1.94). The most frequently occurring hazard was the inadequate process for matching test requests and results received (n=350, 54.1%). Of the 1604 instances where hazards were recorded, the most frequent was at the 'postanalytical test stage' (n=702, 43.8%), followed closely by 'communication outcomes issues' (n=628, 39.1%). Based on arguably the largest data set currently available on the subject matter, our study findings shed new light on the scale and nature of hazards related to test results handling systems, which can inform future efforts to research and improve the design and reliability of these systems. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/

  7. International Space Station ECLSS Technical Task Agreement Summary Report

    NASA Technical Reports Server (NTRS)

    Ray, C. D. (Compiler); Salyer, B. H. (Compiler)

    1999-01-01

    This Technical Memorandum provides a summary of current work accomplished under Technical Task Agreement (TTA) by the Marshall Space Flight Center (MSFC) regarding the International Space Station (ISS) Environmental Control and Life Support System (ECLSS). Current activities include ECLSS component design and development, computer model development, subsystem/integrated system testing, life testing, and general test support provided to the ISS program. Under ECLSS design, MSFC was responsible for the six major ECLSS functions, specifications and standard, component design and development, and was the architectural control agent for the ISS ECLSS. MSFC was responsible for ECLSS analytical model development. In-house subsystem and system level analysis and testing were conducted in support of the design process, including testing air revitalization, water reclamation and management hardware, and certain nonregenerative systems. The activities described herein were approved in task agreements between MSFC and NASA Headquarters Space Station Program Management Office and their prime contractor for the ISS, Boeing. These MSFC activities are in line to the designing, development, testing, and flight of ECLSS equipment planned by Boeing. MSFC's unique capabilities for performing integrated systems testing and analyses, and its ability to perform some tasks cheaper and faster to support ISS program needs, are the basis for the TTA activities.

  8. Autonomously managed electrical power systems

    NASA Technical Reports Server (NTRS)

    Callis, Charles P.

    1986-01-01

    The electric power systems for future spacecraft such as the Space Station will necessarily be more sophisticated and will exhibit more nearly autonomous operation than earlier spacecraft. These new power systems will be more reliable and flexible than their predecessors offering greater utility to the users. Automation approaches implemented on various power system breadboards are investigated. These breadboards include the Hubble Space Telescope power system test bed, the Common Module Power Management and Distribution system breadboard, the Autonomusly Managed Power System (AMPS) breadboard, and the 20 kilohertz power system breadboard. Particular attention is given to the AMPS breadboard. Future plans for these breadboards including the employment of artificial intelligence techniques are addressed.

  9. Financial Management in the Strategic Systems Project Office.

    DTIC Science & Technology

    SSPO, the largest program office in the Navy and in existence for over 20 years, has perfected time tested financial management procedures which may...serve as a model for the student of program management. This report presents an overview of the SSPO financial management concepts and general

  10. KSC-2012-3731

    NASA Image and Video Library

    2012-07-09

    CAPE CANAVERAL, Fla. – Near the Hypergolic Maintenance Facility at NASA’s Kennedy Space Center in Florida, a groundbreaking ceremony was held to mark the location of the Ground Operations Demonstration Unit Liquid Hydrogen, or GODU LH2, test site. From left, are Johnny Nguyen, Fluids Test and Technology Development branch chief Emily Watkins, engineering intern Jeff Walls, Engineering Services Contract, or ESC, Cryogenics Test Lab engineer Kelly Currin, systems engineer Stephen Huff and Rudy Werlink partially hidden, cryogenics engineers Angela Krenn, systems engineer Doug Hammond, command and control engineer in the electrical division William Notardonato, GODU LH2 project manager and Kevin Jumper, ESC Cryogenics Test Lab manager. The GODU LH2 test site is one of the projects in NASA’s Advanced Exploration Systems Program. The site will be used to demonstrate advanced liquid hydrogen systems that are cost and energy efficient ways to store and transfer liquid hydrogen during process, loading, launch and spaceflight. The main components of the site will be a storage tank and a cryogenic refrigerator. Photo credit: NASA/Dimitri Gerondidakis

  11. KSC-2012-3732

    NASA Image and Video Library

    2012-07-09

    CAPE CANAVERAL, Fla. – Near the Hypergolic Maintenance Facility at NASA’s Kennedy Space Center in Florida, a groundbreaking ceremony was held to mark the location of the Ground Operations Demonstration Unit Liquid Hydrogen, or GODU LH2, test site. From left, are Johnny Nguyen, Fluids Test and Technology Development branch chief Emily Watkins, engineering intern Jeff Walls, Engineering Services Contract, or ESC, Cryogenics Test Lab engineer Kelly Currin, systems engineer Stephen Huff and Rudy Werlink partially hidden, cryogenics engineers Angela Krenn, systems engineer Doug Hammond, command and control engineer in the electrical division William Notardonato, GODU LH2 project manager and Kevin Jumper, ESC Cryogenics Test Lab manager. The GODU LH2 test site is one of the projects in NASA’s Advanced Exploration Systems Program. The site will be used to demonstrate advanced liquid hydrogen systems that are cost and energy efficient ways to store and transfer liquid hydrogen during process, loading, launch and spaceflight. The main components of the site will be a storage tank and a cryogenic refrigerator. Photo credit: NASA/Dimitri Gerondidakis

  12. Performance and Health Test Procedure for Grid Energy Storage Systems: Preprint

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Baggu, Murali M; Smith, Kandler A; Friedl, Andrew

    A test procedure to evaluate the performance and health of field installations of grid-connected battery energy storage systems (BESS) is described. Performance and health metrics captured in the procedures are: Round-trip efficiency, Standby losses, Response time/accuracy, and Useable Energy/ State of Charge at different discharge/charge rates over the system's lifetime. The procedures are divided into Reference Performance Tests, which require the system to be put in a test mode and are to be conducted in intervals, and Real-time Monitoring tests, which collect data during normal operation without interruption. The procedures can be applied on a wide array of BESS withmore » little modifications and can thus support BESS operators in the management of BESS field installations with minimal interruption and expenditures.can be applied on a wide array of BESS with little modifications and can thus support BESS operators in the management of BESS field installations with minimal interruption and expenditures.« less

  13. Design and realization of the compound text-based test questions library management system

    NASA Astrophysics Data System (ADS)

    Shi, Lei; Feng, Lin; Zhao, Xin

    2011-12-01

    The test questions library management system is the essential part of the on-line examination system. The basic demand for which is to deal with compound text including information like images, formulae and create the corresponding Word documents. Having compared with the two current solutions of creating documents, this paper presents a design proposal of Word Automation mechanism based on OLE/COM technology, and discusses the way of Word Automation application in detail and at last provides the operating results of the system which have high reference value in improving the generated efficiency of project documents and report forms.

  14. Development of Ada language control software for the NASA power management and distribution test bed

    NASA Technical Reports Server (NTRS)

    Wright, Ted; Mackin, Michael; Gantose, Dave

    1989-01-01

    The Ada language software developed to control the NASA Lewis Research Center's Power Management and Distribution testbed is described. The testbed is a reduced-scale prototype of the electric power system to be used on space station Freedom. It is designed to develop and test hardware and software for a 20-kHz power distribution system. The distributed, multiprocessor, testbed control system has an easy-to-use operator interface with an understandable English-text format. A simple interface for algorithm writers that uses the same commands as the operator interface is provided, encouraging interactive exploration of the system.

  15. TEX-SIS FOLLOW-UP: Student Follow-up Management Information System. Procedures Manual.

    ERIC Educational Resources Information Center

    Tarrant County Junior Coll. District, Ft. Worth, TX.

    Project FOLLOW-UP was conducted to develop, test, and validate a statewide management information system for follow-up of Texas public junior and community college students. The results of this project was a student information system (TEX-SIS) consisting of seven subsystems: (1) Student's Educational Intent, (2) Nonreturning Student Follow-up,…

  16. TEX-SIS FOLLOW-UP: Student Follow-up Management Information System. Data Processing Manual.

    ERIC Educational Resources Information Center

    Tarrant County Junior Coll. District, Ft. Worth, TX.

    Project FOLLOW-UP was conducted to develop, test, and validate a statewide management information system for follow-up of Texas public junior and community college students. The result of this project was a student information system (TEX-SIS) consisting of seven subsystems: (1) Student's Educational Intent, (2) Nonreturning Student Follow-up, (3)…

  17. Development of Incident Report Database for Organizational Learning

    NASA Astrophysics Data System (ADS)

    Otsuka, Yuichi; Abe, Tomotaka; Noguchi, Hiroshi; Makinouchi, Akifumi

    The necessity of an incident reporting system has recently been increasing for hospitals. Japan Council for Quality Health Care (JCQHC) started operating a national incident reporting system to which domestic hospitals would report their incidents. However, the reporting system obtained an additional problem for the hospitals. They managed their own systems which collected reports by papers. The purposes of the reporting systems was to analyze considerable causes involved in incidents to improve the quality of patient safety management. On the contrary, the national reporting system aimed at collecting a statistical tendency of normal incidents. Simultaneously operating the two systems would be too much workload for safety managers. The load may have the managers rest only a short time for summarizing occurrences, not enough for analyzing their causes. However, to the authors' knowledge, there has not been an integrating policy of the two forms to adapt them to practical situations in patient safety management. The scope of this paper is to establish the integrated form in order to use in analyzing the causes of incidents as well as reporting for the national system. We have developed new data base system using XML + XSLT and Java Servlet. The developed system is composed of three computers; DB server , DB client and Data sending server. To investigate usability of the developed system, we conducted a monitoring test by real workers in reporting workplaces. The result of subjective evaluations by examinees was so preferable for the developed system. The results of usability test and the achievement of increasing the number of reports after the introduction can demonstrate the enough effectiveness of the developed system for supporting the activity of patient safety management.

  18. The evaluation of the National Long Term Care Demonstration. 4. Case management under channeling.

    PubMed Central

    Phillips, B R; Kemper, P; Applebaum, R A

    1988-01-01

    The channeling demonstration involved provision of comprehensive case management and direct service expansion. This article considers the former. Under both models, comprehensive case management was implemented largely as intended; moreover, channeling substantially increased the receipt of comprehensive care management. However, channeling was not a pure test of the effect of comprehensive case management: roughly 10-20 percent of control group members received comparable case management services. This was particularly the case for the financial control model. Thus, the demonstration was not a test of case management compared to no case management; rather, it compared channeling case management to the existing community care system, which already was providing comprehensive case management to some of the population eligible for channeling. PMID:3130331

  19. Avionics test bed development plan

    NASA Technical Reports Server (NTRS)

    Harris, L. H.; Parks, J. M.; Murdock, C. R.

    1981-01-01

    A development plan for a proposed avionics test bed facility for the early investigation and evaluation of new concepts for the control of large space structures, orbiter attached flex body experiments, and orbiter enhancements is presented. A distributed data processing facility that utilizes the current laboratory resources for the test bed development is outlined. Future studies required for implementation, the management system for project control, and the baseline system configuration are defined. A background analysis of the specific hardware system for the preliminary baseline avionics test bed system is included.

  20. System acceptance test plan : Dallas Integrated Corridor Management (ICM) demonstration project.

    DOT National Transportation Integrated Search

    2013-02-01

    The Dallas Area Rapid Transit (DART) is leading the US 75 Integrated Corridor Management (ICM) Demonstration Project for the Dallas region. Coordinated corridor operations and management is predicated on being able to share transportation information...

  1. [The balanced scorecard used as a management tool in a clinical laboratory: internal business processes indicators].

    PubMed

    Salinas La Casta, Maria; Flores Pardo, Emilio; Uris Selles, Joaquín

    2009-01-01

    to propose a set of indicators as a management tool for a clinical laboratory, by using the balanced scorecard internal business processes perspective. indicators proposed are obtained from different sources; external proficiency testing of the Valencia Community Government, by means of internal surveys and laboratory information system registers. One year testing process proportion indicators results are showed. internal management indicators are proposed (process, appropriateness and proficiency testing). The process indicators results show gradual improvement since its establishment. after one years of using a conceptually solid Balanced Scorecard Internal business processes perspective indicators, the obtained results validate the usefulness as a laboratory management tool.

  2. IVHS Institutional and Legal Issues Program: Review of the FAST-TRAC Operational Test

    DOT National Transportation Integrated Search

    1994-06-01

    The FAST-TRAC (Faster and Safer Travel through Traffic Routing and Advanced Controls) operational test attempted to integrate advanced traveler information systems (ATIS) and advanced traffic management system (ATMS) technologies in Oakland County, M...

  3. Scaling up HIV viral load - lessons from the large-scale implementation of HIV early infant diagnosis and CD4 testing.

    PubMed

    Peter, Trevor; Zeh, Clement; Katz, Zachary; Elbireer, Ali; Alemayehu, Bereket; Vojnov, Lara; Costa, Alex; Doi, Naoko; Jani, Ilesh

    2017-11-01

    The scale-up of effective HIV viral load (VL) testing is an urgent public health priority. Implementation of testing is supported by the availability of accurate, nucleic acid based laboratory and point-of-care (POC) VL technologies and strong WHO guidance recommending routine testing to identify treatment failure. However, test implementation faces challenges related to the developing health systems in many low-resource countries. The purpose of this commentary is to review the challenges and solutions from the large-scale implementation of other diagnostic tests, namely nucleic-acid based early infant HIV diagnosis (EID) and CD4 testing, and identify key lessons to inform the scale-up of VL. Experience with EID and CD4 testing provides many key lessons to inform VL implementation and may enable more effective and rapid scale-up. The primary lessons from earlier implementation efforts are to strengthen linkage to clinical care after testing, and to improve the efficiency of testing. Opportunities to improve linkage include data systems to support the follow-up of patients through the cascade of care and test delivery, rapid sample referral networks, and POC tests. Opportunities to increase testing efficiency include improvements to procurement and supply chain practices, well connected tiered laboratory networks with rational deployment of test capacity across different levels of health services, routine resource mapping and mobilization to ensure adequate resources for testing programs, and improved operational and quality management of testing services. If applied to VL testing programs, these approaches could help improve the impact of VL on ART failure management and patient outcomes, reduce overall costs and help ensure the sustainable access to reduced pricing for test commodities, as well as improve supportive health systems such as efficient, and more rigorous quality assurance. These lessons draw from traditional laboratory practices as well as fields such as logistics, operations management and business. The lessons and innovations from large-scale EID and CD4 programs described here can be adapted to inform more effective scale-up approaches for VL. They demonstrate that an integrated approach to health system strengthening focusing on key levers for test access such as data systems, supply efficiencies and network management. They also highlight the challenges with implementation and the need for more innovative approaches and effective partnerships to achieve equitable and cost-effective test access. © 2017 The Authors. Journal of the International AIDS Society published by John Wiley & sons Ltd on behalf of the International AIDS Society.

  4. GRC-2010-C-05148

    NASA Image and Video Library

    2006-11-08

    Communications, Navigation, and Network Reconfigurable Test-bed (CoNNeCT) Flight Hardware Compatibility Test Sets - Glenn Research Center and Networks Integration Management Office (NIMO) Testing for the Tracking and Data Relay Satellite System (TDRSS) - Goddard Space Flight Center Testing

  5. GRC-2010-C-05136

    NASA Image and Video Library

    2006-11-16

    Communications, Navigation, and Network Reconfigurable Test-bed (CoNNeCT) Flight Hardware Compatibility Test Sets - Glenn Research Center and Networks Integration Management Office (NIMO) Testing for the Tracking and Data Relay Satellite System (TDRSS) - Goddard Space Flight Center Testing

  6. The General Mission Analysis Tool (GMAT) System Test Plan

    NASA Technical Reports Server (NTRS)

    Conway, Darrel J.; Hughes, Steven P.

    2007-01-01

    This document serves as the System Test Approach for the GMAT Project. Preparation for system testing consists of three major stages: 1) The Test Approach sets the scope of system testing, the overall strategy to be adopted, the activities to be completed, the general resources required and the methods and processes to be used to test the release. It also details the activities, dependencies and effort required to conduct the System Test. 2) Test Planning details the activities, dependencies and effort required to conduct the System Test. 3) Test Cases documents the tests to be applied, the data to be processed, the automated testing coverage and the expected results. This document covers the first two of these items, and established the framework used for the GMAT test case development. The test cases themselves exist as separate components, and are managed outside of and concurrently with this System Test Plan.

  7. 17 CFR 40.10 - Special certification procedures for submission of rules by systemically important derivatives...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... affect financial resources, participant and product eligibility, risk management (including matters relating to margin and stress testing), daily or intraday settlement procedures, default procedures, system... settlement activities and the sufficiency of any proposed risk management techniques. (d) Notice of objection...

  8. 17 CFR 40.10 - Special certification procedures for submission of rules by systemically important derivatives...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... affect financial resources, participant and product eligibility, risk management (including matters relating to margin and stress testing), daily or intraday settlement procedures, default procedures, system... settlement activities and the sufficiency of any proposed risk management techniques. (d) Notice of objection...

  9. 17 CFR 40.10 - Special certification procedures for submission of rules by systemically important derivatives...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... affect financial resources, participant and product eligibility, risk management (including matters relating to margin and stress testing), daily or intraday settlement procedures, default procedures, system... settlement activities and the sufficiency of any proposed risk management techniques. (d) Notice of objection...

  10. UNIX-based operating systems robustness evaluation

    NASA Technical Reports Server (NTRS)

    Chang, Yu-Ming

    1996-01-01

    Robust operating systems are required for reliable computing. Techniques for robustness evaluation of operating systems not only enhance the understanding of the reliability of computer systems, but also provide valuable feed- back to system designers. This thesis presents results from robustness evaluation experiments on five UNIX-based operating systems, which include Digital Equipment's OSF/l, Hewlett Packard's HP-UX, Sun Microsystems' Solaris and SunOS, and Silicon Graphics' IRIX. Three sets of experiments were performed. The methodology for evaluation tested (1) the exception handling mechanism, (2) system resource management, and (3) system capacity under high workload stress. An exception generator was used to evaluate the exception handling mechanism of the operating systems. Results included exit status of the exception generator and the system state. Resource management techniques used by individual operating systems were tested using programs designed to usurp system resources such as physical memory and process slots. Finally, the workload stress testing evaluated the effect of the workload on system performance by running a synthetic workload and recording the response time of local and remote user requests. Moderate to severe performance degradations were observed on the systems under stress.

  11. Practical Approaches to Curriculum Development. A Management Handbook. Project HIRE: A Curriculum Management System for Instructing the Handicapped. Final Report, Volume 2.

    ERIC Educational Resources Information Center

    Gardner, David C.; Beatty, Grace Joely

    Within the context of the major objectives of developing, field testing, and refining the curriculum materials described in volume 1 of this final report (CE 024 117), Volume 2 describes and critiques the management system used by Project HIRE in that development process. (See Note for availability of curriculum materials.) Chapter 1 introduces…

  12. Deployed Analyst History Report, Volume 2. Analytic Support to Combat Operations in the Philippines (2011-2014)

    DTIC Science & Technology

    2015-12-01

    Army Training and Doctrine Command (TRADOC) Analysis Center (TRAC) to the Philippines for Operation ENDURING FREEDOM – Philippines (OEF-P). PROJECT...management, doctrine and force development, training management, system testing, system acquisition, decision analysis, and resource management, as...influenced procurement decisions and reshaped Army doctrine . Additionally, CAA itself has benefited in numerous ways. Combat experience provides analysts

  13. The GOES-R Rebroadcast (GRB) Data Stream Simulator

    NASA Astrophysics Data System (ADS)

    Dittberner, G. J.; Gibbons, K.; Czopkiewicz, E.; Miller, C.; Brown-Bergtold, B.; Haman, B.; Marley, S.

    2013-12-01

    GOES Rebroadcast (GRB) signals in the GOES-R era will replace the current legacy GOES Variable (GVAR) signal and will have substantially different characteristics, including a change in data rate from a single 2.1 Mbps stream to two digital streams of 15.5 Mbps each. Five GRB Simulators were developed as portable systems that output a high-fidelity stream of Consultative Committee for Space Data Systems (CCSDS) formatted GRB packet data equivalent to live GRB data. The data are used for on-site testing of user ingest and data handling systems known as field terminal sites. The GRB Simulator is a fully self-contained system which includes all software and hardware units needed for operation. The operator manages configurations to edit preferences, define individual test scenarios, and manage event logs and reports. Simulations are controlled by test scenarios, which are scripts that specify the test data and provide a series of actions for the GRB Simulator to perform when generating GRB output. Scenarios allow for the insertion of errors or modification of GRB packet headers for testing purposes. The GRB Simulator provides a built-in editor for managing scenarios. The GRB Simulator provides GRB data as either baseband (digital) or Intermediate Frequency (IF) output to the test system. GRB packet data are sent in the same two output streams used in the operational system: one for Left Hand Circular Polarization (LHCP) and one for Right Hand Circular Polarization (RHCP). Use of circular polarization in the operational system allows the transmitting antenna to multiplex the two digital streams into the same signal, thereby doubling the available bandwidth. The GRB Simulator is designed to be used at sites that receive the GRB downlink.

  14. A Cryogenic Fluid System Simulation in Support of Integrated Systems Health Management

    NASA Technical Reports Server (NTRS)

    Barber, John P.; Johnston, Kyle B.; Daigle, Matthew

    2013-01-01

    Simulations serve as important tools throughout the design and operation of engineering systems. In the context of sys-tems health management, simulations serve many uses. For one, the underlying physical models can be used by model-based health management tools to develop diagnostic and prognostic models. These simulations should incorporate both nominal and faulty behavior with the ability to inject various faults into the system. Such simulations can there-fore be used for operator training, for both nominal and faulty situations, as well as for developing and prototyping health management algorithms. In this paper, we describe a methodology for building such simulations. We discuss the design decisions and tools used to build a simulation of a cryogenic fluid test bed, and how it serves as a core technology for systems health management development and maturation.

  15. The Wide-area Energy Management System Phase 2 Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lu, Ning; Makarov, Yuri V.; Weimar, Mark R.

    2010-08-31

    The higher penetration of intermittent generation resources (including wind and solar generation) in the Bonneville Power Administration (BPA) and California Independent System Operator (CAISO) balancing authorities (BAs) raises issue of requiring expensive additional fast grid balancing services in response to additional intermittency and fast up and down power ramps in the electric supply system. The overall goal of the wide-area energy management system (WAEMS) project is to develop the principles, algorithms, market integration rules, a functional design, and a technical specification for an energy storage system to help cope with unexpected rapid changes in renewable generation power output. The resultingmore » system will store excess energy, control dispatchable load and distributed generation, and utilize inter-area exchange of the excess energy between the California ISO and Bonneville Power Administration control areas. A further goal is to provide a cost-benefit analysis and develop a business model for an investment-based practical deployment of such a system. There are two tasks in Phase 2 of the WAEMS project: the flywheel field tests and the battery evaluation. Two final reports, the Wide-area Energy Management System Phase 2 Flywheel Field Tests Final Report and the Wide-area Energy Storage and Management System Battery Storage Evaluation, were written to summarize the results of the two tasks.« less

  16. USAF Test Pilot School. Flying Qualities Textbook, Volume 2, Part 1

    DTIC Science & Technology

    1986-04-01

    Qualities Flight Testing, Performance and Flying Qaulities Branch, Flight Test Engneerd ision, 6510th Test Wing, Air Force Flight Mayst Ce1ter, Edwards...For these aircraft, the program manager may re*uire a mil spec written specifically for the aircraft and control system involwd. 5.20.2 _EL k,Tt...OR MANAGED IN CONTEXT OF MISSION, WITH AVAILABLE PILOT ATTENTION. S UNCONTROLLABLE CONTROL WILL BE LOST DURING SOME PORTION OF MISSION. ACCEPTABLE

  17. Study of toluene rotary fluid management device and shear flow condenser performance for a space-based organic Rankine power system

    NASA Technical Reports Server (NTRS)

    Havens, Vance; Ragaller, Dana

    1988-01-01

    Management of two-phase fluid and control of the heat transfer process in microgravity is a technical challenge that must be addressed for an orbital Organic Rankine Cycle (ORC) application. A test program was performed in 1-g that satisfactorily demonstrated the two-phase management capability of the rotating fluid management device (RFMD) and shear-flow condenser. Operational tests of the RFMD and shear flow condenser in adverse gravity orientations, confirmed that the centrifugal forces in the RFMD and the shear forces in the condenser were capable of overcoming gravity forces. In a microgravity environment, these same forces would not have to compete against gravity and would therefore be dominant. The specific test program covered the required operating range of the Space Station Solar Dynamic Rankine Cycle power system. Review of the test data verified that: fluid was pumped from the RFMD in all attitudes; subcooled states in the condenser were achieved; condensate was pushed uphill against gravity; and noncondensible gases were swept through the condenser.

  18. 30 CFR 250.616 - Blowout preventer system testing, records, and drills.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... drills. 250.616 Section 250.616 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, REGULATION, AND... drills. (a) BOP pressure tests. When you pressure test the BOP system you must conduct a low-pressure... engaged in well-workover operations shall participate in a weekly BOP drill to familiarize crew members...

  19. Roadway usage patterns : urban case studies - final report

    DOT National Transportation Integrated Search

    1996-01-01

    The Orlando Test Network Study was one of a series of investigations conducted as part of the TravTek operational test of an advanced traveler information and traffic management system (ATIS/ATMS). The TravTek system consisted of the Orlando Traffic ...

  20. Patterns-Based IS Change Management in SMEs

    NASA Astrophysics Data System (ADS)

    Makna, Janis; Kirikova, Marite

    The majority of information systems change management guidelines and standards are either too abstract or too bureaucratic to be easily applicable in small enterprises. This chapter proposes the approach, the method, and the prototype that are designed especially for information systems change management in small and medium enterprises. The approach is based on proven patterns of changes in the set of information systems elements. The set of elements was obtained by theoretical analysis of information systems and business process definitions and enterprise architectures. The patterns were evolved from a number of information systems theories and tested in 48 information systems change management projects. The prototype presents and helps to handle three basic change patterns, which help to anticipate the overall scope of changes related to particular elementary changes in an enterprise information system. The use of prototype requires just basic knowledge in organizational business process and information management.

  1. ENVIRONMENTAL TECHNOLOGY VERIFICATION REPORT: STORMWATER MANAGEMENT STORMFILTER® TREATMENT SYSTEM USING PERLITE MEDIA

    EPA Science Inventory

    Verification testing of the Stormwater Management, Inc. StormFilter® Using Perlite Filter Media was conducted on a 0.7 acre drainage basin near downtown Griffin, Georgia. The system consists of an inlet bay, flow spreader, cartridge bay, overflow baffle, and outlet bay, housed in...

  2. Continuous Improvement in the Industrial and Management Systems Engineering Programme at Kuwait University

    ERIC Educational Resources Information Center

    Aldowaisan, Tariq; Allahverdi, Ali

    2016-01-01

    This paper describes the process employed by the Industrial and Management Systems Engineering programme at Kuwait University to continuously improve the programme. Using a continuous improvement framework, the paper demonstrates how various qualitative and quantitative analyses methods, such as hypothesis testing and control charts, have been…

  3. Factors Affecting Selection of Learning Management Systems in Higher Education Institutions

    ERIC Educational Resources Information Center

    Spelke, Kenneth A.

    2011-01-01

    Learning Management Systems, or LMSs, are widely used throughout higher education to deliver a range of instructional services including content delivery, discussion boards and collaborative work space, testing tools, and gradebook functions. LMSs can be used asynchronously or synchronously in support of online learning, classroom-based learning,…

  4. Vibroacoustic payload environment prediction system (VAPEPS): Data base management center remote access guide

    NASA Technical Reports Server (NTRS)

    Thomas, V. C.

    1986-01-01

    A Vibroacoustic Data Base Management Center has been established at the Jet Propulsion Laboratory (JPL). The center utilizes the Vibroacoustic Payload Environment Prediction System (VAPEPS) software package to manage a data base of shuttle and expendable launch vehicle flight and ground test data. Remote terminal access over telephone lines to a dedicated VAPEPS computer system has been established to provide the payload community a convenient means of querying the global VAPEPS data base. This guide describes the functions of the JPL Data Base Management Center and contains instructions for utilizing the resources of the center.

  5. Legionella Risk Management and Control in Potable Water Systems: Argument for the Abolishment of Routine Testing.

    PubMed

    Whiley, Harriet

    2016-12-24

    Legionella is an opportunistic pathogen of public health significance. One of the main sources of Legionella is potable water systems. As a consequence of aging populations there is an increasing demographic considered at high risk for Legionellosis and, as such, a review of the guidelines is required. Worldwide, Legionella has been detected from many potable water sources, suggesting it is ubiquitous in this environment. Previous studies have identified the limitations of the current standard method for Legionella detection and the high possibility of it returning both false negative and false positive results. There is also huge variability in Legionella test results for the same water sample when conducted at different laboratories. However, many guidelines still recommend the testing of water systems. This commentary argues for the removal of routine Legionella monitoring from all water distribution guidelines. This procedure is financially consuming and false negatives may result in managers being over-confident with a system or a control mechanism. Instead, the presence of the pathogen should be assumed and focus spent on managing appropriate control measures and protecting high-risk population groups.

  6. Double silicone tube intubation for the management of partial lacrimal system obstruction.

    PubMed

    Demirci, Hakan; Elner, Victor M

    2008-02-01

    To evaluate the effectiveness of double silicone intubation for the management of partial lacrimal drainage system obstruction in adults. Observational retrospective case series. Twenty-four eyes of 18 consecutive adult patients with partial lacrimal system obstruction managed at the University of Michigan. Retrospective review of symptoms and signs, duration of silicone intubation, and complications. Resolution of tearing. Preoperative tearing, negative Jones I testing, positive Jones II testing, and resistance to positive-pressure irrigation were present in all eyes (100%). The first silicone tube was removed after a mean of 11+/-7 months, and the second tube after 16+/-6 months. Postoperatively, at a mean of 21+/-9 months after removal of both tubes, tearing remained resolved in 19 eyes (79%) and remained improved in 2 eyes (8%). In eyes with resolved tearing, Jones I testing became positive, and there was no resistance to positive-pressure irrigation. Persistent tearing in 3 eyes (13%) required treatment with external dacryocystorhinostomy. The only complication was peripunctal pyogenic granulomas in 2 eyes. Double silicone intubation is an effective minimally invasive technique for treatment of partial lacrimal system obstruction in adults.

  7. Legionella Risk Management and Control in Potable Water Systems: Argument for the Abolishment of Routine Testing

    PubMed Central

    Whiley, Harriet

    2016-01-01

    Legionella is an opportunistic pathogen of public health significance. One of the main sources of Legionella is potable water systems. As a consequence of aging populations there is an increasing demographic considered at high risk for Legionellosis and, as such, a review of the guidelines is required. Worldwide, Legionella has been detected from many potable water sources, suggesting it is ubiquitous in this environment. Previous studies have identified the limitations of the current standard method for Legionella detection and the high possibility of it returning both false negative and false positive results. There is also huge variability in Legionella test results for the same water sample when conducted at different laboratories. However, many guidelines still recommend the testing of water systems. This commentary argues for the removal of routine Legionella monitoring from all water distribution guidelines. This procedure is financially consuming and false negatives may result in managers being over-confident with a system or a control mechanism. Instead, the presence of the pathogen should be assumed and focus spent on managing appropriate control measures and protecting high-risk population groups. PMID:28029126

  8. Reusable Launch Vehicle Technology Program

    NASA Technical Reports Server (NTRS)

    Freeman, Delma C., Jr.; Talay, Theodore A.; Austin, R. Eugene

    1996-01-01

    Industry/NASA Reusable Launch Vehicle (RLV) Technology Program efforts are underway to design, test, and develop technologies and concepts for viable commercial launch systems that also satisfy national needs at acceptable recurring costs. Significant progress has been made in understanding the technical challenges of fully reusable launch systems and the accompanying management and operational approaches for achieving a low-cost program. This paper reviews the current status of the Reusable Launch Vehicle Technology Program including the DC-XA, X-33 and X-34 flight systems and associated technology programs. It addresses the specific technologies being tested that address the technical and operability challenges of reusable launch systems including reusable cryogenic propellant tanks, composite structures, thermal protection systems, improved propulsion, and subsystem operability enhancements. The recently concluded DC-XA test program demonstrated some of these technologies in ground and flight tests. Contracts were awarded recently for both the X-33 and X-34 flight demonstrator systems. The Orbital Sciences Corporation X-34 flight test vehicle will demonstrate an air-launched reusable vehicle capable of flight to speeds of Mach 8. The Lockheed-Martin X-33 flight test vehicle will expand the test envelope for critical technologies to flight speeds of Mach 15. A propulsion program to test the X-33 linear aerospike rocket engine using a NASA SR-71 high speed aircraft as a test bed is also discussed. The paper also describes the management and operational approaches that address the challenge of new cost-effective, reusable launch vehicle systems.

  9. Design an optimum safety policy for personnel safety management - A system dynamic approach

    NASA Astrophysics Data System (ADS)

    Balaji, P.

    2014-10-01

    Personnel safety management (PSM) ensures that employee's work conditions are healthy and safe by various proactive and reactive approaches. Nowadays it is a complex phenomenon because of increasing dynamic nature of organisations which results in an increase of accidents. An important part of accident prevention is to understand the existing system properly and make safety strategies for that system. System dynamics modelling appears to be an appropriate methodology to explore and make strategy for PSM. Many system dynamics models of industrial systems have been built entirely for specific host firms. This thesis illustrates an alternative approach. The generic system dynamics model of Personnel safety management was developed and tested in a host firm. The model was undergone various structural, behavioural and policy tests. The utility and effectiveness of model was further explored through modelling a safety scenario. In order to create effective safety policy under resource constraint, DOE (Design of experiment) was used. DOE uses classic designs, namely, fractional factorials and central composite designs. It used to make second order regression equation which serve as an objective function. That function was optimized under budget constraint and optimum value used for safety policy which shown greatest improvement in overall PSM. The outcome of this research indicates that personnel safety management model has the capability for acting as instruction tool to improve understanding of safety management and also as an aid to policy making.

  10. Optimization of knowledge-based systems and expert system building tools

    NASA Technical Reports Server (NTRS)

    Yasuda, Phyllis; Mckellar, Donald

    1993-01-01

    The objectives of the NASA-AMES Cooperative Agreement were to investigate, develop, and evaluate, via test cases, the system parameters and processing algorithms that constrain the overall performance of the Information Sciences Division's Artificial Intelligence Research Facility. Written reports covering various aspects of the grant were submitted to the co-investigators for the grant. Research studies concentrated on the field of artificial intelligence knowledge-based systems technology. Activities included the following areas: (1) AI training classes; (2) merging optical and digital processing; (3) science experiment remote coaching; (4) SSF data management system tests; (5) computer integrated documentation project; (6) conservation of design knowledge project; (7) project management calendar and reporting system; (8) automation and robotics technology assessment; (9) advanced computer architectures and operating systems; and (10) honors program.

  11. PACS: acceptance test, quality control, warranty, and maintenance continuum

    NASA Astrophysics Data System (ADS)

    Romlein, John R.; Norton, Gary S.; Lyche, David K.; Richardson, Ronald R., Jr.

    1999-07-01

    As PACS gain greater acceptance and use in medical facilities the question of life cycle management must be addressed in terms that relate to the common business practices for medical information system and medical devices. The issues in life cycle management of such a system are relatively new to the industry. Increased use of PACS within the medical community requires that standardized life cycle management practices by developed and implemented. This paper develops a new of life cycle issues as cyclic and related events that are not only manageable, but also predictable in terms, of, frequency, duration data content, data exchange, potential outcomes, staffing requirement, documentation, and staff interaction. This view is presented as a continuum that begins at the acceptance testing of a PACS and continues throughout its life cycle. The continuum incorporates the required relationship between quality control testing and maintenance actions during warranty period and the maintenance years. Interrelated cyclic events are described that bind these processes together and provide a basis for long-term proactive management of PACS in a medical environment.

  12. National Day Care Study First Annual Report. Volume III: Information Management and Data Collection Systems.

    ERIC Educational Resources Information Center

    Goodrich, Nancy; And Others

    Volume III of the National Day Care Study First Annual Report funded by the Office of Child Development describes the information management system which was developed and tested during Phase I. In addition, the volume includes overviews of the sample instruments from the three major data collection systems developed during the year: the Research…

  13. Ground testing and flight demonstration of charge management of insulated test masses using UV-LED electron photoemission

    NASA Astrophysics Data System (ADS)

    Saraf, Shailendhar; Buchman, Sasha; Balakrishnan, Karthik; Lui, Chin Yang; Soulage, Michael; Faied, Dohy; Hanson, John; Ling, Kuok; Jaroux, Belgacem; Suwaidan, Badr Al; AlRashed, Abdullah; Al-Nassban, Badr; Alaqeel, Faisal; Harbi, Mohammed Al; Salamah, Badr Bin; Othman, Mohammed Bin; Qasim, Bandar Bin; Alfauwaz, Abdulrahman; Al-Majed, Mohammed; DeBra, Daniel; Byer, Robert

    2016-12-01

    The UV-LED mission demonstrates the precise control of the potential of electrically isolated test masses. Test mass charge control is essential for the operation of space accelerometers and drag-free sensors which are at the core of geodesy, aeronomy and precision navigation missions as well as gravitational wave experiments and observatories. Charge management using photoelectrons generated by the 254 nm UV line of Hg was first demonstrated on Gravity Probe B and is presently part of the LISA Pathfinder technology demonstration. The UV-LED mission and prior ground testing demonstrates that AlGaN UVLEDs operating at 255 nm are superior to Hg lamps because of their smaller size, lower power draw, higher dynamic range, and higher control authority. We show laboratory data demonstrating the effectiveness and survivability of the UV-LED devices and performance of the charge management system. We also show flight data from a small satellite experiment that was one of the payloads on KACST’s SaudiSat-4 mission that demonstrates ‘AC charge control’ (UV-LEDs and bias are AC modulated with adjustable relative phase) between a spherical test mass and its housing. The result of the mission brings the UV-LED device Technology Readiness Level (TRL) to TRL-9 and the charge management system to TRL-7. We demonstrate the ability to control the test mass potential on an 89 mm diameter spherical test mass over a 20 mm gap in a drag-free system configuration, with potential measured using an ultra-high impedance contact probe. Finally, the key electrical and optical characteristics of the UV-LEDs showed less than 7.5% change in performance after 12 months in orbit.

  14. Development of a Work Control System for Propulsion Testing at Stennis Space Center (SSC)

    NASA Technical Reports Server (NTRS)

    Messer, Elizabeth A.

    2004-01-01

    In 1996, Stennis Space Center was given management authority for all Propulsion Testing for NASA. Over the next few years several research and development (R&D) test facilities were completed and brought up to full operation in what is known as the E-Complex Test Facility at Stennis Space Center. This paper will explain the requirements and steps taken to develop the current Test Operations' electronic work control system. The Work Control System developed includes work authorization documents such as test preparation sheets, discrepancy reports, pre-test briefing reports, and test requests.

  15. Concepts. The Journal of Defense Systems Acquisition Management. Winter 1981. Volume 4. Number 1.

    DTIC Science & Technology

    1981-01-01

    Long, USAF A major challenge facing the program manager is to effectively obtain and manage program funds. It is the author’s view that too few...Henry H. Mendenhall As defense systems become more and more complex, an effective test and evaluation program becomes more and more necessary. This means...that lies ahead for the military acquisition manager. And let us not think for a moment that optimism alone will suffice. Good, effective , efficient

  16. Orion Flight Test Preview Briefing

    NASA Image and Video Library

    2014-11-06

    In the Kennedy Space Center’s Press Site auditorium, members of the news media are briefed on the upcoming Orion flight test. From left are: Rachel Kraft, NASA Public Affairs, Bill Hill, NASA deputy associate administrator for Exploration Systems Development, Mark Geyer, NASA Orion Program manager, Bryan Austin, Lockheed Martin mission manager, Jeremy Graeber, Operations Integration Branch of Ground Systems Development and Operations at Kennedy, and Ron Fortson, United Launch Alliance director of Mission Management. Mike Sarafin, NASA's lead flight director, participated by video from the Johnson Space Center. Orion is the exploration spacecraft designed to carry astronauts to destinations not yet explored by humans, including an asteroid and Mars. It will have emergency abort capability, sustain the crew during space travel and provide safe re-entry from deep space return velocities. The first unpiloted flight test of Orion is scheduled to launch Dec. 4, 2014 atop a United Launch Alliance Delta IV Heavy rocket, and in 2018 on NASA’s Space Launch System rocket.

  17. Flight Test Evaluation of an Unmanned Aircraft System Traffic Management (UTM) Concept for Multiple Beyond-Visual-Line-of-Sight (BVLOS) Operations

    NASA Technical Reports Server (NTRS)

    Johnson, Marcus; Jung, Jaewoo; Rios, Joseph; Mercer, Joey; Homola, Jeffrey; Prevot, Thomas; Mulfinger, Daniel; Kopardekar, Parimal

    2017-01-01

    Many applications of small Unmanned Aircraft System (UAS) have been envisioned. These include surveillance of key assets such as pipelines, rail, or electric wires, deliveries, search and rescue, traffic monitoring, videography, and precision agriculture. These operations are likely to occur in the same airspace in the presence of many static and dynamic constraints such as airports, and high wind areas. Therefore, operations of small UAS need to be managed to ensure safety and operation efficiency is maintained. NASA has advanced a concept for UAS Traffic Management (UTM) and has initiated a research effort to refine that concept and develop operational and system requirements. A UTM research platform is in development and flight test activities to evaluate core functions and key assumptions focusing exclusively on UAS operations in different environments are underway. This seminar will present lessons learned from a recent flight test focused on enabling operations of multiple UAS in lower-risk environments within and beyond visual line of sight (BVLOS).

  18. Load converter interactions with the secondary system in the Space Station Freedom power management and distribution DC test bed

    NASA Technical Reports Server (NTRS)

    Lebron, Ramon C.

    1992-01-01

    The NASA LeRC in Cleveland, Ohio, is responsible for the design, development, and assembly of the Space Station Freedom (SSF) Electrical Power System (EPS). In order to identify and understand system level issues during the SSF Program design and development phases, a system Power Management and Distribution (PMAD) DC test bed was assembled. Some of the objectives of this test bed facility are the evaluation of, system efficiency, power quality, system stability, and system protection and reconfiguration schemes. In order to provide a realistic operating scenario, dc Load Converter Units are used in the PMAD dc test bed to characterize the user interface with the power system. These units are dc to dc converters that provide the final system regulation before power is delivered to the load. This final regulation is required on the actual space station because the majority of user loads will require voltage levels different from the secondary bus voltage. This paper describes the testing of load converters in an end to end system environment (from solar array to loads) where their interactions and compatibility with other system components are considered. Some of the system effects of interest that are presented include load converters transient behavior interactions with protective current limiting switchgear, load converters ripple effects, and the effects of load converter constant power behavior with protective features such as foldback.

  19. Load converter interactions with the secondary system in the Space Station Freedom power management and distribution dc test bed

    NASA Technical Reports Server (NTRS)

    Lebron, Ramon C.

    1992-01-01

    The NASA LeRC in Cleveland, Ohio, is responsible for the design, development, and assembly of the Space Station Freedom (SSF) Electrical Power System (EPS). In order to identify and understand system level issues during the SSF program design and development phases, a system Power Management and Distribution (PMAD) dc test bed was assembled. Some of the objectives of this test bed facility are the evaluation of, system efficiency, power quality, system stability, and system protection and reconfiguration schemes. In order to provide a realistic operating scenario, dc Load Converter Units are used in the PMAD dc test bed to characterize the user interface with the power system. These units are dc to dc converters that provide the final system regulation before power is delivered to the load. This final regulation is required on the actual space station because the majority of user loads will require voltage levels different from the secondary bus voltage. This paper describes the testing of load converters in an end to end system environment (from solar array to loads) where their interactions and compatibility with other system components are considered. Some of the system effects of interest that are presented include load converters transient behavior interactions with protective current limiting switchgear, load converters ripple effects, and the effects of load converter constant power behavior with protective features such as foldback.

  20. Thinking outside ISD: A management model for instructional design

    NASA Astrophysics Data System (ADS)

    Taylor, Tony Dewayne

    The purpose of this study was to examine the effectiveness of an instructional system management-level model proposed by the author designed to orchestrate the efficient development and implementation of customer requested curriculum. The three phases of systems-based model are designed to ensure delivery of high quality and timely instruction are: (1) the assessment and documentation of organizational training requirements; (2) project management control of curriculum development; and (3) the implementation of relevant instruction by competent instructors. This model also provides (4) measurable and quantifiable course evaluation results to justify return on investment and validate its importance with respect to the customer's organizational strategic objectives. The theoretical approach for this study was systems theory-based due to the nature of the instructional systems design model and the systematic design of the management model. The study was accomplished using single-case study application of qualitative style of inquiry as described by Patton (2002). Qualitative inquiry was selected to collect and analyze participant holistic perspective assessment of effectiveness, relevance, and timeliness of the instructional design management model. Participants for this study included five managers, five subject matter experts, and six students assigned to a military organization responsible for the collection of hydrographic data for the U.S. Navy. Triangulation of data sources within the qualitative framework of the study incorporated the three participant groups---managers, SMEs, and students---incorporated multiple views of the course development and implementation to validate the findings and the remove researcher bias. Qualitative coding was accomplished by importing transcribed interviews into Microsoft Excel and sorted using Auto-Filter. The coded interviews indicated effective functionality in the views of the model from each of the three participant groups. Results from a pre-test/post-test comparative analysis indicated a significant difference between the pre-test and post-test mean at the p < .001 for the six students. Although the subject of the case study was within a military training environment, the application of the proposed instructional systems managerial model can be applied to the design, development, delivery, and assessment of instructional material in any line of study where quantifiable effective learning is the goal.

  1. A System for Fault Management for NASA's Deep Space Habitat

    NASA Technical Reports Server (NTRS)

    Colombano, Silvano P.; Spirkovska, Liljana; Aaseng, Gordon B.; Mccann, Robert S.; Baskaran, Vijayakumar; Ossenfort, John P.; Smith, Irene Skupniewicz; Iverson, David L.; Schwabacher, Mark A.

    2013-01-01

    NASA's exploration program envisions the utilization of a Deep Space Habitat (DSH) for human exploration of the space environment in the vicinity of Mars and/or asteroids. Communication latencies with ground control of as long as 20+ minutes make it imperative that DSH operations be highly autonomous, as any telemetry-based detection of a systems problem on Earth could well occur too late to assist the crew with the problem. A DSH-based development program has been initiated to develop and test the automation technologies necessary to support highly autonomous DSH operations. One such technology is a fault management tool to support performance monitoring of vehicle systems operations and to assist with real-time decision making in connection with operational anomalies and failures. Toward that end, we are developing Advanced Caution and Warning System (ACAWS), a tool that combines dynamic and interactive graphical representations of spacecraft systems, systems modeling, automated diagnostic analysis and root cause identification, system and mission impact assessment, and mitigation procedure identification to help spacecraft operators (both flight controllers and crew) understand and respond to anomalies more effectively. In this paper, we describe four major architecture elements of ACAWS: Anomaly Detection, Fault Isolation, System Effects Analysis, and Graphic User Interface (GUI), and how these elements work in concert with each other and with other tools to provide fault management support to both the controllers and crew. We then describe recent evaluations and tests of ACAWS on the DSH testbed. The results of these tests support the feasibility and strength of our approach to failure management automation and enhanced operational autonomy.

  2. A System for Fault Management and Fault Consequences Analysis for NASA's Deep Space Habitat

    NASA Technical Reports Server (NTRS)

    Colombano, Silvano; Spirkovska, Liljana; Baskaran, Vijaykumar; Aaseng, Gordon; McCann, Robert S.; Ossenfort, John; Smith, Irene; Iverson, David L.; Schwabacher, Mark

    2013-01-01

    NASA's exploration program envisions the utilization of a Deep Space Habitat (DSH) for human exploration of the space environment in the vicinity of Mars and/or asteroids. Communication latencies with ground control of as long as 20+ minutes make it imperative that DSH operations be highly autonomous, as any telemetry-based detection of a systems problem on Earth could well occur too late to assist the crew with the problem. A DSH-based development program has been initiated to develop and test the automation technologies necessary to support highly autonomous DSH operations. One such technology is a fault management tool to support performance monitoring of vehicle systems operations and to assist with real-time decision making in connection with operational anomalies and failures. Toward that end, we are developing Advanced Caution and Warning System (ACAWS), a tool that combines dynamic and interactive graphical representations of spacecraft systems, systems modeling, automated diagnostic analysis and root cause identification, system and mission impact assessment, and mitigation procedure identification to help spacecraft operators (both flight controllers and crew) understand and respond to anomalies more effectively. In this paper, we describe four major architecture elements of ACAWS: Anomaly Detection, Fault Isolation, System Effects Analysis, and Graphic User Interface (GUI), and how these elements work in concert with each other and with other tools to provide fault management support to both the controllers and crew. We then describe recent evaluations and tests of ACAWS on the DSH testbed. The results of these tests support the feasibility and strength of our approach to failure management automation and enhanced operational autonomy

  3. Report of the Power Sub systems Panel. [spacecraft instrumentation technology

    NASA Technical Reports Server (NTRS)

    1979-01-01

    Problems in spacecraft power system design, testing, integration, and operation are identified and solutions are defined. The specific technology development problems discussed include substorm and plasma design data, modeling of the power subsystem and components, power system monitoring and degraded system management, rotary joints for transmission of power and signals, nickel cadmium battery manufacturing and application, on-array power management, high voltage technology, and solar arrays.

  4. Evaluation and use of the Materials and Test (MATT) Data System for quality of construction and management review : final report.

    DOT National Transportation Integrated Search

    1985-12-01

    This report documents the review of the MATerials and Test (MATT) Data System to check the validity of data within the system. A computer program to generate the quality level of a construction material was developed. Programs were also developed to ...

  5. SAGA: A project to automate the management of software production systems

    NASA Technical Reports Server (NTRS)

    Campbell, Roy H.; Laliberte, D.; Render, H.; Sum, R.; Smith, W.; Terwilliger, R.

    1987-01-01

    The Software Automation, Generation and Administration (SAGA) project is investigating the design and construction of practical software engineering environments for developing and maintaining aerospace systems and applications software. The research includes the practical organization of the software lifecycle, configuration management, software requirements specifications, executable specifications, design methodologies, programming, verification, validation and testing, version control, maintenance, the reuse of software, software libraries, documentation, and automated management.

  6. 9th Annual Systems Engineering Conference: Volume 2 Tuesday

    DTIC Science & Technology

    2006-10-26

    Laboratory, Ben-Gurion University of the Negev Jacob Herscovitz Space systems Directorate RAFAEL jacobh@rafael.co.il A Pragmatic Focus in Managing...Maintainability Tests •Environmental Qualification Tests – Humidity, Salt Fog, Shock, Vibration, Rain UE, Rain CE, Solar Radiation , Icing, Fluid

  7. Managing Complexity in the MSL/Curiosity Entry, Descent, and Landing Flight Software and Avionics Verification and Validation Campaign

    NASA Technical Reports Server (NTRS)

    Stehura, Aaron; Rozek, Matthew

    2013-01-01

    The complexity of the Mars Science Laboratory (MSL) mission presented the Entry, Descent, and Landing systems engineering team with many challenges in its Verification and Validation (V&V) campaign. This paper describes some of the logistical hurdles related to managing a complex set of requirements, test venues, test objectives, and analysis products in the implementation of a specific portion of the overall V&V program to test the interaction of flight software with the MSL avionics suite. Application-specific solutions to these problems are presented herein, which can be generalized to other space missions and to similar formidable systems engineering problems.

  8. STGT program: Ada coding and architecture lessons learned

    NASA Technical Reports Server (NTRS)

    Usavage, Paul; Nagurney, Don

    1992-01-01

    STGT (Second TDRSS Ground Terminal) is currently halfway through the System Integration Test phase (Level 4 Testing). To date, many software architecture and Ada language issues have been encountered and solved. This paper, which is the transcript of a presentation at the 3 Dec. meeting, attempts to define these lessons plus others learned regarding software project management and risk management issues, training, performance, reuse, and reliability. Observations are included regarding the use of particular Ada coding constructs, software architecture trade-offs during the prototyping, development and testing stages of the project, and dangers inherent in parallel or concurrent systems, software, hardware, and operations engineering.

  9. UTM Technical Capabilities Level 2 (TLC2) Test at Reno-Stead Airport.

    NASA Image and Video Library

    2016-10-06

    Test of Unmanned Aircraft Systems Traffic Management (UTM) technical capability Level 2 (TCL2) at Reno-Stead Airport, Nevada. During the test, five drones simultaneously crossed paths, separated by altitude. Two drones flew beyond visual line-of-sight and three flew within line-of-sight of their operators. Engineers Priya Venkatesan and Joey Mercer review flight paths using the UAS traffic management research platform at flight operations mission control at NASA’s UTM TCL2 test.

  10. The MIST /MIUS Integration and Subsystems Test/ laboratory - A testbed for the MIUS /Modular Integrated Utility System/ program

    NASA Technical Reports Server (NTRS)

    Beckham, W. S., Jr.; Keune, F. A.

    1974-01-01

    The MIUS (Modular Integrated Utility System) concept is to be an energy-conserving, economically feasible, integrated community utility system to provide five necessary services: electricity generation, space heating and air conditioning, solid waste processing, liquid waste processing, and residential water purification. The MIST (MIUS Integration and Subsystem Test) integrated system testbed constructed at the Johnson Space Center in Houston includes subsystems for power generation, heating, ventilation, and air conditioning (HVAC), wastewater management, solid waste management, and control and monitoring. The key design issues under study include thermal integration and distribution techniques, thermal storage, integration of subsystems controls and displays, incinerator performance, effluent characteristics, and odor control.

  11. Developing and establishing bee species as crop pollinators: the example of Osmia spp. (Hymenoptera: Megachilidae) and fruit trees.

    PubMed

    Bosch, J; Bosch, J; Kemp, W P

    2002-02-01

    The development of a bee species as a new crop pollinator starts with the identification of a pollination-limited crop production deficit and the selection of one or more candidate pollinator species. The process continues with a series of studies on the developmental biology, pollinating efficacy, nesting behaviour, preference for different nesting substrates, and population dynamics of the candidate pollinator. Parallel studies investigate the biology of parasites, predators and pathogens. The information gained in these studies is combined with information on the reproductive biology of the crop to design a management system. Complete management systems should provide guidelines on rearing and releasing methods, bee densities required for adequate pollination, nesting materials, and control against parasites, predators and pathogens. Management systems should also provide methods to ensure a reliable pollinator supply. Pilot tests on a commercial scale are then conducted to test and eventually refine the management system. The process culminates with the delivery of a viable system to manage and sustain the new pollinator on a commercial scale. The process is illustrated by the development of three mason bees, Osmia cornifrons (Radoszkowski), O. lignaria Say and O. cornuta (Latreille) as orchard pollinators in Japan, the USA and Europe, respectively.

  12. Simulating timber management in Lake States forests.

    Treesearch

    Gary J. Brand

    1981-01-01

    Describes in detail a management subsystem to simulate cutting in Lake States forest types. This subsystem is part of a Stand and Tree Evaluation and Modeling System (STEMS) contained in the Forest Resource Evaluation Program (FREP) for the Lake States. The management subsystem can be used to test the effect of alternate management strategies.

  13. Managing Knowledge Performance: Testing the Components of a Knowledge Management System on Organizational Performance

    ERIC Educational Resources Information Center

    Cho, Taejun; Korte, Russell

    2014-01-01

    The main purpose of the current study is to validate the framework of knowledge management (KM) capabilities created by Gold ("Towards a theory of organizational knowledge management capabilities." Doctoral dissertation, University of North Carolina, Chapel Hill) 2001) in a study of South Korean companies. However, the original framework…

  14. Network operating system focus technology

    NASA Technical Reports Server (NTRS)

    1985-01-01

    An activity structured to provide specific design requirements and specifications for the Space Station Data Management System (DMS) Network Operating System (NOS) is outlined. Examples are given of the types of supporting studies and implementation tasks presently underway to realize a DMS test bed capability to develop hands-on understanding of NOS requirements as driven by actual subsystem test beds participating in the overall Johnson Space Center test bed program. Classical operating system elements and principal NOS functions are listed.

  15. Intellectual Production Supervision Perform based on RFID Smart Electricity Meter

    NASA Astrophysics Data System (ADS)

    Chen, Xiangqun; Huang, Rui; Shen, Liman; chen, Hao; Xiong, Dezhi; Xiao, Xiangqi; Liu, Mouhai; Xu, Renheng

    2018-03-01

    This topic develops the RFID intelligent electricity meter production supervision project management system. The system is designed for energy meter production supervision in the management of the project schedule, quality and cost information management requirements in RFID intelligent power, and provide quantitative information more comprehensive, timely and accurate for supervision engineer and project manager management decisions, and to provide technical information for the product manufacturing stage file. From the angle of scheme analysis, design, implementation and test, the system development of production supervision project management system for RFID smart meter project is discussed. Focus on the development of the system, combined with the main business application and management mode at this stage, focuses on the energy meter to monitor progress information, quality information and cost based information on RFID intelligent power management function. The paper introduces the design scheme of the system, the overall client / server architecture, client oriented graphical user interface universal, complete the supervision of project management and interactive transaction information display, the server system of realizing the main program. The system is programmed with C# language and.NET operating environment, and the client and server platforms use Windows operating system, and the database server software uses Oracle. The overall platform supports mainstream information and standards and has good scalability.

  16. Safely Enabling UAS Operations in Low-Altitude Airspace

    NASA Technical Reports Server (NTRS)

    Kopardekar, Parimal

    2017-01-01

    NASA is developing a system to safely enable low altitude unmanned aerial system (UAS) operations. The system is referred to as UAS Traffic Management (UTM). The UTM will safely enable a variety of business models and multiple operations in the same airspace. The UTM will provide services such as airspace configuration and geo-fencing, weather and wind integration, demand-capacity imbalance management, and separation management, and contingency management. The UTM research and development has been conducted in collaboration with many in industry, academia, and government. The UTM system will evolve through four builds. Each build will be collaboratively tested with partners. The final prototype will be available for persistent daily use of UAS operations beyond line of sight.

  17. Managing a Test Item Bank on a Microcomputer: Can It Help You and Your Students?

    ERIC Educational Resources Information Center

    Peterson, Julian A.; Meister, Lynn L.

    1983-01-01

    Describes a test item bank developed by the Association for Medical School Departments of Biochemistry (Texas). Programs (written in Pascal) allow self-evaluation by interactive student access to questions randomly selected from a chosen category. Potential users of the system (having student, manager, and instructor modes) are invited to contact…

  18. Development of a change management system

    NASA Technical Reports Server (NTRS)

    Parks, Cathy Bonifas

    1993-01-01

    The complexity and interdependence of software on a computer system can create a situation where a solution to one problem causes failures in dependent software. In the computer industry, software problems arise and are often solved with 'quick and dirty' solutions. But in implementing these solutions, documentation about the solution or user notification of changes is often overlooked, and new problems are frequently introduced because of insufficient review or testing. These problems increase when numerous heterogeneous systems are involved. Because of this situation, a change management system plays an integral part in the maintenance of any multisystem computing environment. At the NASA Ames Advanced Computational Facility (ACF), the Online Change Management System (OCMS) was designed and developed to manage the changes being applied to its multivendor computing environment. This paper documents the research, design, and modifications that went into the development of this change management system (CMS).

  19. Electric vehicle energy management system

    NASA Astrophysics Data System (ADS)

    Alaoui, Chakib

    This thesis investigates and analyzes novel strategies for the optimum energy management of electric vehicles (EVs). These are aimed to maximize the useful life of the EV batteries and make the EV more practical in order to increase its acceptability to market. The first strategy concerns the right choice of the batteries for the EV according to the user's driving habits, which may vary. Tests conducted at the University of Massachusetts Lowell battery lab show that the batteries perform differently from one manufacturer to the other. The second strategy was to investigate the fast chargeability of different batteries, which leads to reduce the time needed to recharge the EV battery pack. Tests were conducted again to prove that only few battery types could be fast charged. Test data were used to design a fast battery charger that could be installed in an EV charging station. The third strategy was the design, fabrication and application of an Electric Vehicle Diagnostic and Rejuvenation System (EVDRS). This system is based on Mosfet Controlled Thyristors (MCTs). It is capable of quickly identifying any failing battery(s) within the EV pack and rejuvenating the whole battery pack without dismantling them and unloading them. A novel algorithm to rejuvenate Electric Vehicle Sealed Lead Acid Batteries is described. This rejuvenation extends the useful life of the batteries and makes the EV more competitive. The fourth strategy was to design a thermal management system for EV, which is crucial to the safe operation, and the achievement of normal/optimal performance of, electric vehicle (EV) batteries. A novel approach for EV thermal management, based on Pettier-Effect heat pumps, was designed, fabricated and tested in EV. It shows the application of this type of technology for thermal management of EVs.

  20. Advanced Hybrid Propulsion and Energy Management System for High Efficiency, Off Highway, 240 Ton Class, Diesel Electric Haul Trucks

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Richter, Tim; Slezak, Lee; Johnson, Chris

    2008-12-31

    The objective of this project is to reduce the fuel consumption of off-highway vehicles, specifically large tonnage mine haul trucks. A hybrid energy storage and management system will be added to a conventional diesel-electric truck that will allow capture of braking energy normally dissipated in grid resistors as heat. The captured energy will be used during acceleration and motoring, reducing the diesel engine load, thus conserving fuel. The project will work towards a system validation of the hybrid system by first selecting an energy storage subsystem and energy management subsystem. Laboratory testing at a subscale level will evaluate these selectionsmore » and then a full-scale laboratory test will be performed. After the subsystems have been proven at the full-scale lab, equipment will be mounted on a mine haul truck and integrated with the vehicle systems. The integrated hybrid components will be exercised to show functionality, capability, and fuel economy impacts in a mine setting.« less

  1. UTM Technical Capabilities Level 2 (TLC2) Test at Reno-Stead Airport.

    NASA Image and Video Library

    2016-10-06

    Test of Unmanned Aircraft Systems Traffic Management (UTM) technical capability Level 2 (TCL2) at Reno-Stead Airport, Nevada. During the test, five drones simultaneously crossed paths, separated by altitude. Two drones flew beyond visual line-of-sight and three flew within line-of-sight of their operators. Engineer Joey Mercer reviews flight paths using the UAS traffic management research platform UTM coordinator app to verify and validate flight paths.

  2. Software Manages Documentation in a Large Test Facility

    NASA Technical Reports Server (NTRS)

    Gurneck, Joseph M.

    2001-01-01

    The 3MCS computer program assists and instrumentation engineer in performing the 3 essential functions of design, documentation, and configuration management of measurement and control systems in a large test facility. Services provided by 3MCS are acceptance of input from multiple engineers and technicians working at multiple locations;standardization of drawings;automated cross-referencing; identification of errors;listing of components and resources; downloading of test settings; and provision of information to customers.

  3. Workarounds and Test Results Follow-up in Electronic Health Record-Based Primary Care

    PubMed Central

    Menon, Shailaja; Murphy, Daniel R.; Singh, Hardeep; Meyer, Ashley N. D.

    2016-01-01

    Summary Background Electronic health records (EHRs) have potential to facilitate reliable communication and follow-up of test results. However, limitations in EHR functionality remain, leading practitioners to use workarounds while managing test results. Workarounds can lead to patient safety concerns and signify indications as to how to build better EHR systems that meet provider needs. Objective To understand why primary care practitioners (PCPs) use workarounds to manage test results by analyzing data from a previously conducted national cross-sectional survey on test result management. Methods We conducted a secondary data analysis of quantitative and qualitative data from a national survey of PCPs practicing in the Department of Veterans Affairs (VA) and explored the use of workarounds in test results management. We used multivariate logistic regression analysis to examine the association between key sociotechnical factors that could affect test results follow-up (e.g., both technology-related and those unrelated to technology, such as organizational support for patient notification) and workaround use. We conducted a qualitative content analysis of free text survey data to examine reasons for use of workarounds. Results Of 2554 survey respondents, 1104 (43%) reported using workarounds related to test results management. Of these 1028 (93%) described the type of workaround they were using; 719 (70%) reported paper-based methods, while 230 (22%) used a combination of paper- and computer-based workarounds. Primary care practitioners who self-reported limited administrative support to help them notify patients of test results or described an instance where they personally (or a colleague) missed results, were more likely to use workarounds (p=0.02 and p=0.001, respectively). Qualitative analysis identified three main reasons for workaround use: 1) as a memory aid, 2) for improved efficiency and 3) for facilitating internal and external care coordination. Conclusion Workarounds to manage EHR-based test results are common, and their use results from unmet provider information management needs. Future EHRs and the respective work systems around them need to evolve to meet these needs. PMID:27437060

  4. Feasibility of a Secure Wireless Sensing Smartwatch Application for the Self-Management of Pediatric Asthma

    PubMed Central

    Hosseini, Anahita; Buonocore, Chris M.; Hashemzadeh, Sepideh; Hojaiji, Hannaneh; Kalantarian, Haik; Sideris, Costas; Bui, Alex A.T.; Sarrafzadeh, Majid

    2017-01-01

    To address the need for asthma self-management in pediatrics, the authors present the feasibility of a mobile health (mHealth) platform built on their prior work in an asthmatic adult and child. Real-time asthma attack risk was assessed through physiological and environmental sensors. Data were sent to a cloud via a smartwatch application (app) using Health Insurance Portability and Accountability Act (HIPAA)-compliant cryptography and combined with online source data. A risk level (high, medium or low) was determined using a random forest classifier and then sent to the app to be visualized as animated dragon graphics for easy interpretation by children. The feasibility of the system was first tested on an adult with moderate asthma, then usability was examined on a child with mild asthma over several weeks. It was found during feasibility testing that the system is able to assess asthma risk with 80.10 ± 14.13% accuracy. During usability testing, it was able to continuously collect sensor data, and the child was able to wear, easily understand and enjoy the use of the system. If tested in more individuals, this system may lead to an effective self-management program that can reduce hospitalization in those who suffer from asthma. PMID:28771168

  5. Integrated corridor management initiative : demonstration phase evaluation. Dallas institutional and organizational analysis test plan.

    DOT National Transportation Integrated Search

    2000-10-01

    The Advanced Rural Traveler Information System (ARTIS) began development June 30, 1995. While a number of activities were underway to operationally test and evaluate metro or urban traveler information systems in the 75 target markets, ARTIS setout t...

  6. 1989-90 Implementation of the Management Information System.

    ERIC Educational Resources Information Center

    Hamre, William; Holsclaw, Mick

    For the past three years, the Board of Governors has made the development and implementation of the California Community College Management Information System (MIS) a major priority. Following two years of pilot testing with five community college districts, statewide implementation of Phase I of MIS is slated to begin in July/August 1989. Several…

  7. ENVIRONMENTAL TECHNOLOGY VERIFICATION REPORT: STORMWATER SOURCE AREA TREATMENT DEVICE: STORMWATER MANAGEMENT INC., STORMSCREEN� TREATMENT SYSTEM

    EPA Science Inventory

    Verification Testing of the Stormwater Management, Inc. StormScreen treatment technology was performed during a 12-month period starting in May, 2003. The system was previously installed in a city-owned right-of-way near downtown Griffin, GA., and is a device for removing trash,...

  8. Evaluating Management Strategies for Automated Test Systems/Equipment (ATS/E): An F-15 Case Study

    DTIC Science & Technology

    2005-03-01

    ethnography , grounded theory , case study , phenomenological research , and narrative research (also known as bibliography from...Creswell, 2003:183). Example inquiry strategies identified by Creswell are: narrative , phenomenology , ethnography , case study , and grounded theory ...other managed systems. Methodology The researcher chose a qualitative research methodology and

  9. AdiosStMan: Parallelizing Casacore Table Data System using Adaptive IO System

    NASA Astrophysics Data System (ADS)

    Wang, R.; Harris, C.; Wicenec, A.

    2016-07-01

    In this paper, we investigate the Casacore Table Data System (CTDS) used in the casacore and CASA libraries, and methods to parallelize it. CTDS provides a storage manager plugin mechanism for third-party developers to design and implement their own CTDS storage managers. Having this in mind, we looked into various storage backend techniques that can possibly enable parallel I/O for CTDS by implementing new storage managers. After carrying on benchmarks showing the excellent parallel I/O throughput of the Adaptive IO System (ADIOS), we implemented an ADIOS based parallel CTDS storage manager. We then applied the CASA MSTransform frequency split task to verify the ADIOS Storage Manager. We also ran a series of performance tests to examine the I/O throughput in a massively parallel scenario.

  10. Architectures and Evaluation for Adjustable Control Autonomy for Space-Based Life Support Systems

    NASA Technical Reports Server (NTRS)

    Malin, Jane T.; Schreckenghost, Debra K.

    2001-01-01

    In the past five years, a number of automation applications for control of crew life support systems have been developed and evaluated in the Adjustable Autonomy Testbed at NASA's Johnson Space Center. This paper surveys progress on an adjustable autonomous control architecture for situations where software and human operators work together to manage anomalies and other system problems. When problems occur, the level of control autonomy can be adjusted, so that operators and software agents can work together on diagnosis and recovery. In 1997 adjustable autonomy software was developed to manage gas transfer and storage in a closed life support test. Four crewmembers lived and worked in a chamber for 91 days, with both air and water recycling. CO2 was converted to O2 by gas processing systems and wheat crops. With the automation software, significantly fewer hours were spent monitoring operations. System-level validation testing of the software by interactive hybrid simulation revealed problems both in software requirements and implementation. Since that time, we have been developing multi-agent approaches for automation software and human operators, to cooperatively control systems and manage problems. Each new capability has been tested and demonstrated in realistic dynamic anomaly scenarios, using the hybrid simulation tool.

  11. Development of image and information management system for Korean standard brain

    NASA Astrophysics Data System (ADS)

    Chung, Soon Cheol; Choi, Do Young; Tack, Gye Rae; Sohn, Jin Hun

    2004-04-01

    The purpose of this study is to establish a reference for image acquisition for completing a standard brain for diverse Korean population, and to develop database management system that saves and manages acquired brain images and personal information of subjects. 3D MP-RAGE (Magnetization Prepared Rapid Gradient Echo) technique which has excellent Signal to Noise Ratio (SNR) and Contrast to Noise Ratio (CNR) as well as reduces image acquisition time was selected for anatomical image acquisition, and parameter values were obtained for the optimal image acquisition. Using these standards, image data of 121 young adults (early twenties) were obtained and stored in the system. System was designed to obtain, save, and manage not only anatomical image data but also subjects' basic demographic factors, medical history, handedness inventory, state-trait anxiety inventory, A-type personality inventory, self-assessment depression inventory, mini-mental state examination, intelligence test, and results of personality test via a survey questionnaire. Additionally this system was designed to have functions of saving, inserting, deleting, searching, and printing image data and personal information of subjects, and to have accessibility to them as well as automatic connection setup with ODBC. This newly developed system may have major contribution to the completion of a standard brain for diverse Korean population since it can save and manage their image data and personal information.

  12. The Effectiveness of Using Learning Management Systems and Collaborative Tool in Web-Based Teaching of Programming Languages

    ERIC Educational Resources Information Center

    Cavus, Nadire; Uzunboylu, Huseyin; Ibrahim, Dogan

    2006-01-01

    This paper is about a pilot study which has been carried out at the Near East University during the 2004/5 Fall Semester using the Moodle LMS [learning management system] together with GREWPtool collaborative editor. The system has been tested with 36 students taking the Java and the Pascal programming courses. The results of the pilot study…

  13. vvtools v. 1.0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Drake, Richard R.

    Vvtools is a suite of testing tools, with a focus on reproducible verification and validation. They are written in pure Python, and contain a test harness and an automated process management tool. Users of vvtools can develop suites of verification and validation tests and run them on small to large high performance computing resources in an automated and reproducible way. The test harness enables complex processes to be performed in each test and even supports a one-level parent/child dependency between tests. It includes a built in capability to manage workloads requiring multiple processors and platforms that use batch queueing systems.

  14. Development of a microprocessor controller for stand-alone photovoltaic power systems

    NASA Technical Reports Server (NTRS)

    Millner, A. R.; Kaufman, D. L.

    1984-01-01

    A controller for stand-alone photovoltaic systems has been developed using a low power CMOS microprocessor. It performs battery state of charge estimation, array control, load management, instrumentation, automatic testing, and communications functions. Array control options are sequential subarray switching and maximum power control. A calculator keypad and LCD display provides manual control, fault diagnosis and digital multimeter functions. An RS-232 port provides data logging or remote control capability. A prototype 5 kW unit has been built and tested successfully. The controller is expected to be useful in village photovoltaic power systems, large solar water pumping installations, and other battery management applications.

  15. Testing of Candidate Polymeric Materials for Compatibility with Pure Alternate Pretreat as Part of the Universal Waste Management System (UWMS)

    NASA Technical Reports Server (NTRS)

    Wingard, C. D.

    2018-01-01

    The Universal Waste Management System (UWMS) is an improved Waste Collection System for astronauts living and working in low Earth orbit spacecraft. Polymeric materials used in water recovery on International Space Station are regularly exposed to phosphoric acid-treated 'pretreated' urine. Polymeric materials used in UWMS are not only exposed to pretreated urine, but also to concentrated phosphoric acid with oxidizer before dilution known as 'pure pretreat.' Samples of five different polymeric materials immersed in pure pretreat for 1 year were tested for liquid compatibility by measuring changes in storage modulus with a dynamic mechanical analyzer.

  16. Experiences with lead/acid battery management in remote-area power-supply (RAPS) systems

    NASA Astrophysics Data System (ADS)

    Phillips, S. J.; Pryor, T. L.; Dymond, M. S.; Remmer, D. P.

    Battery management and general storage performance and cost remain major problems in remote-area power-supply (RAPS) systems utilizing renewable energy sources. A brief review of field experiences with lead/acid batteries is presented, together with results from battery tests carried out in the laboratory. It is recommended that further collaboration between battery manufacturers and system designers is established to develop improved storage systems for RAPS applications.

  17. Integrated testing system FiTest for diagnosis of PCBA

    NASA Astrophysics Data System (ADS)

    Bogdan, Arkadiusz; Lesniak, Adam

    2016-12-01

    This article presents the innovative integrated testing system FiTest for automatic, quick inspection of printed circuit board assemblies (PCBA) manufactured in Surface Mount Technology (SMT). Integration of Automatic Optical Inspection (AOI), In-Circuit Tests (ICT) and Functional Circuit Tests (FCT) resulted in universal hardware platform for testing variety of electronic circuits. The platform provides increased test coverage, decreased level of false calls and optimization of test duration. The platform is equipped with powerful algorithms performing tests in a stable and repetitive way and providing effective management of diagnosis.

  18. System-Level Testing of the Advanced Stirling Radioisotope Generator Engineering Hardware

    NASA Technical Reports Server (NTRS)

    Chan, Jack; Wiser, Jack; Brown, Greg; Florin, Dominic; Oriti, Salvatore M.

    2014-01-01

    To support future NASA deep space missions, a radioisotope power system utilizing Stirling power conversion technology was under development. This development effort was performed under the joint sponsorship of the Department of Energy and NASA, until its termination at the end of 2013 due to budget constraints. The higher conversion efficiency of the Stirling cycle compared with that of the Radioisotope Thermoelectric Generators (RTGs) used in previous missions (Viking, Pioneer, Voyager, Galileo, Ulysses, Cassini, Pluto New Horizons and Mars Science Laboratory) offers the advantage of a four-fold reduction in Pu-238 fuel, thereby extending its limited domestic supply. As part of closeout activities, system-level testing of flight-like Advanced Stirling Convertors (ASCs) with a flight-like ASC Controller Unit (ACU) was performed in February 2014. This hardware is the most representative of the flight design tested to date. The test fully demonstrates the following ACU and system functionality: system startup; ASC control and operation at nominal and worst-case operating conditions; power rectification; DC output power management throughout nominal and out-of-range host voltage levels; ACU fault management, and system command / telemetry via MIL-STD 1553 bus. This testing shows the viability of such a system for future deep space missions and bolsters confidence in the maturity of the flight design.

  19. Performance management system enhancement and maintenance

    NASA Technical Reports Server (NTRS)

    Cleaver, T. G.; Ahour, R.; Johnson, B. R.

    1984-01-01

    The research described in this report concludes a two-year effort to develop a Performance Management System (PMS) for the NCC computers. PMS provides semi-automated monthly reports to NASA and contractor management on the status and performance of the NCC computers in the TDRSS program. Throughout 1984, PMS was tested, debugged, extended, and enhanced. Regular PMS monthly reports were produced and distributed. PMS continues to operate at the NCC under control of Bendix Corp. personnel.

  20. The Johnson Space Center Management Information Systems (JSCMIS). 1: Requirements Definition and Design Specifications for Versions 2.1 and 2.1.1. 2: Documented Test Scenario Environments. 3: Security Design and Specifications

    NASA Technical Reports Server (NTRS)

    1986-01-01

    The Johnson Space Center Management Information System (JSCMIS) is an interface to computer data bases at NASA Johnson which allows an authorized user to browse and retrieve information from a variety of sources with minimum effort. This issue gives requirements definition and design specifications for versions 2.1 and 2.1.1, along with documented test scenario environments, and security object design and specifications.

  1. Y-12 Integrated Materials Management System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Alspaugh, D. H.; Hickerson, T. W.

    2002-06-03

    The Integrated Materials Management System, when fully implemented, will provide the Y-12 National Security Complex with advanced inventory information and analysis capabilities and enable effective assessment, forecasting and management of nuclear materials, critical non-nuclear materials, and certified supplies. These capabilities will facilitate future Y-12 stockpile management work, enhance interfaces to existing National Nuclear Security Administration (NNSA) corporate-level information systems, and enable interfaces to planned NNSA systems. In the current national nuclear defense environment where, for example, weapons testing is not permitted, material managers need better, faster, more complete information about material properties and characteristics. They now must manage non-special nuclearmore » material at the same high-level they have managed SNM, and information capabilities about both must be improved. The full automation and integration of business activities related to nuclear and non-nuclear materials that will be put into effect by the Integrated Materials Management System (IMMS) will significantly improve and streamline the process of providing vital information to Y-12 and NNSA managers. This overview looks at the kinds of information improvements targeted by the IMMS project, related issues, the proposed information architecture, and the progress to date in implementing the system.« less

  2. System for Informatics in the Molecular Pathology Laboratory: An Open-Source End-to-End Solution for Next-Generation Sequencing Clinical Data Management.

    PubMed

    Kang, Wenjun; Kadri, Sabah; Puranik, Rutika; Wurst, Michelle N; Patil, Sushant A; Mujacic, Ibro; Benhamed, Sonia; Niu, Nifang; Zhen, Chao Jie; Ameti, Bekim; Long, Bradley C; Galbo, Filipo; Montes, David; Iracheta, Crystal; Gamboa, Venessa L; Lopez, Daisy; Yourshaw, Michael; Lawrence, Carolyn A; Aisner, Dara L; Fitzpatrick, Carrie; McNerney, Megan E; Wang, Y Lynn; Andrade, Jorge; Volchenboum, Samuel L; Furtado, Larissa V; Ritterhouse, Lauren L; Segal, Jeremy P

    2018-04-24

    Next-generation sequencing (NGS) diagnostic assays increasingly are becoming the standard of care in oncology practice. As the scale of an NGS laboratory grows, management of these assays requires organizing large amounts of information, including patient data, laboratory processes, genomic data, as well as variant interpretation and reporting. Although several Laboratory Information Systems and/or Laboratory Information Management Systems are commercially available, they may not meet all of the needs of a given laboratory, in addition to being frequently cost-prohibitive. Herein, we present the System for Informatics in the Molecular Pathology Laboratory, a free and open-source Laboratory Information System/Laboratory Information Management System for academic and nonprofit molecular pathology NGS laboratories, developed at the Genomic and Molecular Pathology Division at the University of Chicago Medicine. The System for Informatics in the Molecular Pathology Laboratory was designed as a modular end-to-end information system to handle all stages of the NGS laboratory workload from test order to reporting. We describe the features of the system, its clinical validation at the Genomic and Molecular Pathology Division at the University of Chicago Medicine, and its installation and testing within a different academic center laboratory (University of Colorado), and we propose a platform for future community co-development and interlaboratory data sharing. Copyright © 2018. Published by Elsevier Inc.

  3. Navy Occupational Health Information Management System (NOHIMS). System/Functional Manager’s Guide

    DTIC Science & Technology

    1987-04-01

    6g1111018 U0sl0 ETtlt FILE SVIIVT TEST 344 ISN P ?I So DUPLICATE %ON 9NI IULIPLE EaTsIf r Vi0 SIC saa4iSl reft" @4r AirM UNITPL l l~~ ( Of MIN INVAID OSl ...I . . ... I I I . . Noise Source: A-5 . I ! I I I .! I .,I ! . 1 I Calibration Information: Dosimeter Pre Calibration...department to identify their records uniquely in the Materials Management System. DoD - Department of Defense. Dosimeter - A device for measuring

  4. Management of infants born to women infected with hepatitis B in the military healthcare system.

    PubMed

    Sainato, Rebecca J; Simmons, Elizabeth G; Muench, Dawn F; Burnett, Mark W; Braun, LoRanée

    2013-08-28

    Hepatitis B virus (HBV) is endemic worldwide. Given significant rates of infectivity, all infants born to Hepatitis B surface antigen positive mothers need to receive treatment at birth, immunization and post-vaccination serologic testing. However, not all infants complete these requirements. We performed a retrospective review of the management of infants born to Hepatitis B infected mothers at two large military hospitals in the United States that use a global electronic medical record to track patient results. We then compared these results to those recently published by the National Perinatal Hepatitis B Prevention Program (PHBPP), which does not include hospitals in the United States Military Healthcare System. Our results show that although all infants were managed appropriately at birth and immunization rates were very high, post vaccination follow-up testing rates were much lower than those seen in centers participating in the PHBPP. The rates of post vaccination serological testing were significantly higher for infants born to Hepatitis B e antigen positive mothers and those referred to a pediatric infectious disease specialist. Despite use of a global electronic medical record in the United States Military Healthcare System, management of HBV-exposed infants does not always follow recommended guidelines. These infants could benefit from a more systematic method of follow-up, similar to the PHBPP, to ensure HBV serologic testing is obtained after the vaccination series is complete.

  5. Phase 1 IWAR Test Results

    DTIC Science & Technology

    2010-01-01

    Symantec Server Antivirus 1 1 1 1 2 7 8 8 Service Passwords 0 10 4 4 4 10 5 5 Banner Needs 0 0 0 0 0 0 0 0 Unauthorized Software 0 1 0 1 4 1 4 1... software needed to manage and operate systems in the testing rooms. Systems in the testing rooms were made to resemble shipboard Navy systems as closely...i.e., work- station and server software , routing and switching, operating systems, and so forth). This training was also designed to provide

  6. The continuing problem of missed test results in an integrated health system with an advanced electronic medical record.

    PubMed

    Wahls, Terry; Haugen, Thomas; Cram, Peter

    2007-08-01

    Missed results can cause needless treatment delays. However, there is little data about the magnitude of this problem and the systems that clinics use to manage test results. Surveys about potential problems related to test results management were developed and administered to clinical staff in a regional Veterans Administration (VA) health care network. The provider survey, conducted four times between May 2005 and October 2006, sampling VA staff physicians, physician assistants, nurse practitioners, and internal medicine trainees, asked questions about the frequency of missed results and diagnosis or treatment delays seen in the antecedent two weeks in their clinics, or if a trainee, the antecedent month. Clinical staff survey response rate was 39% (143 of 370), with 40% using standard operating procedures to manage test results. Forty-four percent routinely reported all results to patients. The provider survey response rate was 50% (441 of 884) overall, with responses often (37% overall; range 29% to 46%) indicating they had seen patients with diagnosis or treatment delays attributed to a missed result; 15% reported two or more such encounters. Even in an integrated health system with an advanced electronic medical record, missed test results and associated diagnosis or treatment delays are common. Additional study and measures of missed results and associated treatment delays are needed.

  7. Approaches to quality management and accreditation in a genetic testing laboratory

    PubMed Central

    Berwouts, Sarah; Morris, Michael A; Dequeker, Elisabeth

    2010-01-01

    Medical laboratories, and specifically genetic testing laboratories, provide vital medical services to different clients: clinicians requesting a test, patients from whom the sample was collected, public health and medical-legal instances, referral laboratories and authoritative bodies. All expect results that are accurate and obtained in an efficient and effective manner, within a suitable time frame and at acceptable cost. There are different ways of achieving the end results, but compliance with International Organization for Standardization (ISO) 15189, the international standard for the accreditation of medical laboratories, is becoming progressively accepted as the optimal approach to assuring quality in medical testing. We present recommendations and strategies designed to aid genetic testing laboratories with the implementation of a quality management system, including key aspects such as document control, external quality assessment, internal quality control, internal audit, management review, validation, as well as managing the human side of change. The focus is on pragmatic approaches to attain the levels of quality management and quality assurance required for accreditation according to ISO 15189, within the context of genetic testing. Attention is also given to implementing efficient and effective quality improvement. PMID:20720559

  8. ROBERT BOBO AND MIKE NICHOLS AT TEST STAND 4693

    NASA Image and Video Library

    2016-12-14

    ROBERT BOBO, LEFT, AND MIKE NICHOLS TALK BENEATH THE 221-FOOT-TALL TEST STAND 4693, THE LARGEST OF TWO NEW SPACE LAUNCH SYSTEM TEST STANDS AT MSFC. BOBO MANAGES SLS STRUCTURAL STRENGTH TESTING, AND NICHOLS IS LEAD TEST ENGINEER FOR THE SLS LIQUID HYDROGEN TANK.

  9. Criterion-Referenced Test Items for Welding.

    ERIC Educational Resources Information Center

    Davis, Diane, Ed.

    This test item bank on welding contains test questions based upon competencies found in the Missouri Welding Competency Profile. Some test items are keyed for multiple competencies. These criterion-referenced test items are designed to work with the Vocational Instructional Management System. Questions have been statistically sampled and validated…

  10. The Environmental Qualification Specification as a Technical Management Tool,

    DTIC Science & Technology

    1981-11-01

    CommuentI The dwell test for fatigue of the isolation system in a container is intended to be an accelerated test, in order to save test time and...diagnostic purposes * Response computation is not the only possible design approach. In the development of control system or servomechanism theory , emphasis...seldom aborts a mission in the same way as a complete failure of any function, and properly influences system effectiveness through a different type of

  11. Residential load management system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Uhr, C.W.

    1986-03-01

    The MAX load management system marketed by the UHR Corporation is described. The system completely replaces conventional heating, cooling, and hot water equipment. It is designed to reduce significantly the home's peak demand during the electric utility's system-wide peak load periods while at the same time maintain the homeowner's comfort. The integration of microprocessor, thermal storage, and heat pump technologies allows for broad flexibility in terms of tailoring the system to a specific electric utility's needs. Twelve pilot systems installed in Northern Virginia outside of Washington, DC have been operational since early 1985. The test results to date have confirmedmore » both the system's load management capability and its comfort improvement characteristics. The fundamental characteristics and hardware for the system are described. 9 figures.« less

  12. 21 CFR 862.1235 - Cyclosporine test system.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Cyclosporine test system. 862.1235 Section 862.1235 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED... quantitatively determine cyclosporine concentrations as an aid in the management of transplant patients receiving...

  13. 21 CFR 862.1678 - Tacrolimus test system.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Tacrolimus test system. 862.1678 Section 862.1678 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED... quantitatively determine tacrolimus concentrations as an aid in the management of transplant patients receiving...

  14. Proceedings of the Symposium on Long-Life Hardware for Space

    NASA Technical Reports Server (NTRS)

    1970-01-01

    Two-volume edition of the papers of the symposium is described. It is divided into six sections - parts, materials, management, system testing, component design, and system test. Material presented focuses attention on problems created by the increased complexity of technology and long-term mission requirements.

  15. SSME component assembly and life management expert system

    NASA Technical Reports Server (NTRS)

    Ali, M.; Dietz, W. E.; Ferber, H. J.

    1989-01-01

    The space shuttle utilizes several rocket engine systems, all of which must function with a high degree of reliability for successful mission completion. The space shuttle main engine (SSME) is by far the most complex of the rocket engine systems and is designed to be reusable. The reusability of spacecraft systems introduces many problems related to testing, reliability, and logistics. Components must be assembled from parts inventories in a manner which will most effectively utilize the available parts. Assembly must be scheduled to efficiently utilize available assembly benches while still maintaining flight schedules. Assembled components must be assigned to as many contiguous flights as possible, to minimize component changes. Each component must undergo a rigorous testing program prior to flight. In addition, testing and assembly of flight engines and components must be done in conjunction with the assembly and testing of developmental engines and components. The development, testing, manufacture, and flight assignments of the engine fleet involves the satisfaction of many logistical and operational requirements, subject to many constraints. The purpose of the SSME Component Assembly and Life Management Expert System (CALMES) is to assist the engine assembly and scheduling process, and to insure that these activities utilize available resources as efficiently as possible.

  16. 41 CFR 101-31.200 - Cross-reference to the Federal Acquisition Regulation (FAR) (48 CFR chapter 1, parts 1-99).

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Cross-reference to the... Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 31-INSPECTION AND QUALITY CONTROL 31.2-Private Inspection, Testing, and...

  17. Participatory innovation process for testing new practices for soil fertility management in Chókwè Irrigation Scheme (Mozambique)

    NASA Astrophysics Data System (ADS)

    Sánchez Reparaz, Maite; de Vente, Joris; Famba, Sebastiao; Rougier, Jean-Emmanuel; Ángel Sánchez-Monedero, Miguel; Barberá, Gonzalo G.

    2015-04-01

    Integrated water and nutrient management are key factors to increase productivity and to reduce the yield gap in irrigated systems in Sub-Saharan Africa. These two elements are affected by an ensemble of abiotic, biotic, management and socio-economic factors that need to be taken into account to reduce the yield gap, as well as farmers' perceptions and knowledge. In the framework of the project European Union and African Union cooperative research to increase Food production in irrigated farming systems in Africa (EAU4Food project) we are carrying out a participatory innovation process in Chókwè irrigation scheme (Mozambique) based on stakeholders engagement, to test new practices for soil fertility management that can increase yields reducing costs. Through a method combining interviews with three farmers' associations and other relevant stakeholders and soil sampling from the interviewed farmers' plots with the organization of Communities of Practices, we tried to capture how soil fertility is managed by farmers, the constraints they find as well as their perceptions about soil resources. This information was the basis to design and conduct a participatory innovation process where compost made with rice straw and manure is being tested by a farmers' association. Most important limitations of the method are also evaluated. Our results show that socio-economic characteristics of farmers condition how they manage soil fertility and their perceptions. The difficulties they face to adopt new practices for soil fertility management, mainly related to economic resources limitations, labour availability, knowledge time or farm structure, require a systemic understanding that takes into account abiotic, biotic, management and socio-economic factors and their implication as active stakeholders in all phases of the innovation process.

  18. Knowledge-based system for flight information management. Thesis

    NASA Technical Reports Server (NTRS)

    Ricks, Wendell R.

    1990-01-01

    The use of knowledge-based system (KBS) architectures to manage information on the primary flight display (PFD) of commercial aircraft is described. The PFD information management strategy used tailored the information on the PFD to the tasks the pilot performed. The KBS design and implementation of the task-tailored PFD information management application is described. The knowledge acquisition and subsequent system design of a flight-phase-detection KBS is also described. The flight-phase output of this KBS was used as input to the task-tailored PFD information management KBS. The implementation and integration of this KBS with existing aircraft systems and the other KBS is described. The flight tests are examined of both KBS's, collectively called the Task-Tailored Flight Information Manager (TTFIM), which verified their implementation and integration, and validated the software engineering advantages of the KBS approach in an operational environment.

  19. Design an optimum safety policy for personnel safety management - A system dynamic approach

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Balaji, P.

    2014-10-06

    Personnel safety management (PSM) ensures that employee's work conditions are healthy and safe by various proactive and reactive approaches. Nowadays it is a complex phenomenon because of increasing dynamic nature of organisations which results in an increase of accidents. An important part of accident prevention is to understand the existing system properly and make safety strategies for that system. System dynamics modelling appears to be an appropriate methodology to explore and make strategy for PSM. Many system dynamics models of industrial systems have been built entirely for specific host firms. This thesis illustrates an alternative approach. The generic system dynamicsmore » model of Personnel safety management was developed and tested in a host firm. The model was undergone various structural, behavioural and policy tests. The utility and effectiveness of model was further explored through modelling a safety scenario. In order to create effective safety policy under resource constraint, DOE (Design of experiment) was used. DOE uses classic designs, namely, fractional factorials and central composite designs. It used to make second order regression equation which serve as an objective function. That function was optimized under budget constraint and optimum value used for safety policy which shown greatest improvement in overall PSM. The outcome of this research indicates that personnel safety management model has the capability for acting as instruction tool to improve understanding of safety management and also as an aid to policy making.« less

  20. Automated electric power management and control for Space Station Freedom

    NASA Technical Reports Server (NTRS)

    Dolce, James L.; Mellor, Pamela A.; Kish, James A.

    1990-01-01

    A comprehensive automation design is being developed for Space Station Freedom's electric power system. It strives to increase station productivity by applying expert systems and conventional algorithms to automate power system operation. An integrated approach to the power system command and control problem is defined and used to direct technology development in: diagnosis, security monitoring and analysis, battery management, and cooperative problem-solving for resource allocation. The prototype automated power system is developed using simulations and test-beds.

  1. Space shuttle low cost/risk avionics study

    NASA Technical Reports Server (NTRS)

    1971-01-01

    All work breakdown structure elements containing any avionics related effort were examined for pricing the life cycle costs. The analytical, testing, and integration efforts are included for the basic onboard avionics and electrical power systems. The design and procurement of special test equipment and maintenance and repair equipment are considered. Program management associated with these efforts is described. Flight test spares and labor and materials associated with the operations and maintenance of the avionics systems throughout the horizontal flight test are examined. It was determined that cost savings can be achieved by using existing hardware, maximizing orbiter-booster commonality, specifying new equipments to MIL quality standards, basing redundancy on cost effective analysis, minimizing software complexity and reducing cross strapping and computer-managed functions, utilizing compilers and floating point computers, and evolving the design as dictated by the horizontal flight test schedules.

  2. Reducing Missed Laboratory Results: Defining Temporal Responsibility, Generating User Interfaces for Test Process Tracking, and Retrospective Analyses to Identify Problems

    PubMed Central

    Tarkan, Sureyya; Plaisant, Catherine; Shneiderman, Ben; Hettinger, A. Zachary

    2011-01-01

    Researchers have conducted numerous case studies reporting the details on how laboratory test results of patients were missed by the ordering medical providers. Given the importance of timely test results in an outpatient setting, there is limited discussion of electronic versions of test result management tools to help clinicians and medical staff with this complex process. This paper presents three ideas to reduce missed results with a system that facilitates tracking laboratory tests from order to completion as well as during follow-up: (1) define a workflow management model that clarifies responsible agents and associated time frame, (2) generate a user interface for tracking that could eventually be integrated into current electronic health record (EHR) systems, (3) help identify common problems in past orders through retrospective analyses. PMID:22195201

  3. Conducting Closed Habitation Experiments: Experience from the Lunar Mars Life Support Test Project

    NASA Technical Reports Server (NTRS)

    Barta, Daniel J.; Edeen, Marybeth A.; Henninger, Donald L.

    2004-01-01

    The Lunar-Mars Life Support Test Project (LMLSTP) was conducted from 1995 through 1997 at the National Aeronautics and Space Administration s (NASA) Johnson Space Center (JSC) to demonstrate increasingly longer duration operation of integrated, closed-loop life support systems that employed biological and physicochemical techniques for water recycling, waste processing, air revitalization, thermal control, and food production. An analog environment for long-duration human space travel, the conditions of isolation and confinement also enabled studies of human factors, medical sciences (both physiology and psychology) and crew training. Four tests were conducted, Phases I, II, IIa and III, with durations of 15, 30,60 and 91 days, respectively. The first phase focused on biological air regeneration, using wheat to generate enough oxygen for one experimental subject. The systems demonstrated in the later phases were increasingly complex and interdependent, and provided life support for four crew members. The tests were conducted using two human-rated, atmospherically-closed test chambers, the Variable Pressure Growth Chamber (VPGC) and the Integrated Life Support Systems Test Facility (ILSSTF). Systems included test articles (the life support hardware under evaluation), human accommodations (living quarters, kitchen, exercise equipment, etc.) and facility systems (emergency matrix system, power, cooling, etc.). The test team was managed by a lead engineer and a test director, and included test article engineers responsible for specific systems, subsystems or test articles, test conductors, facility engineers, chamber operators and engineering technicians, medical and safety officers, and science experimenters. A crew selection committee, comprised of psychologists, engineers and managers involved in the test, evaluated male and female volunteers who applied to be test subjects. Selection was based on the skills mix anticipated for each particular test, and utilized information from psychological and medical testing, data on the knowledge, experience and skills of the applicants, and team building exercises. The design, development, buildup and operation of test hardware and documentation followed the established NASA processes and requirements for test buildup and operation.

  4. Conducting Closed Habitation Experiments: Experience from the Lunar Mars Life Support Test Project

    NASA Technical Reports Server (NTRS)

    Barta, Daniel J.; Edeen, Marybeth A.; Henninger, Donald L.

    2006-01-01

    The Lunar-Mars Life Support Test Project (LMLSTP) was conducted from 1995 through 1997 at the National Aeronautics and Space Administration s (NASA) Johnson Space Center (JSC) to demonstrate increasingly longer duration operation of integrated, closed-loop life support systems that employed biological and physicochemical techniques for water recycling, waste processing, air revitalization, thermal control, and food production. An analog environment for long-duration human space travel, the conditions of isolation and confinement also enabled studies of human factors, medical sciences (both physiology and psychology) and crew training. Four tests were conducted, Phases I, II, IIa and III, with durations of 15, 30, 60 and 91 days, respectively. The first phase focused on biological air regeneration, using wheat to generate enough oxygen for one experimental subject. The systems demonstrated in the later phases were increasingly complex and interdependent, and provided life support for four crew members. The tests were conducted using two human-rated, atmospherically-closed test chambers, the Variable Pressure Growth Chamber (VPGC) and the Integrated Life Support Systems Test Facility (ILSSTF). Systems included test articles (the life support hardware under evaluation), human accommodations (living quarters, kitchen, exercise equipment, etc.) and facility systems (emergency matrix system, power, cooling, etc.). The test team was managed by a lead engineer and a test director, and included test article engineers responsible for specific systems, subsystems or test articles, test conductors, facility engineers, chamber operators and engineering technicians, medical and safety officers, and science experimenters. A crew selection committee, comprised of psychologists, engineers and managers involved in the test, evaluated male and female volunteers who applied to be test subjects. Selection was based on the skills mix anticipated for each particular test, and utilized information from psychological and medical testing, data on the knowledge, experience and skills of the applicants, and team building exercises. The design, development, buildup and operation of test hardware and documentation followed the established NASA processes and requirements for test buildup and operation.

  5. Reduction in Unnecessary Clinical Laboratory Testing Through Utilization Management at a US Government Veterans Affairs Hospital.

    PubMed

    Konger, Raymond L; Ndekwe, Paul; Jones, Genea; Schmidt, Ronald P; Trey, Marty; Baty, Eric J; Wilhite, Denise; Munshi, Imtiaz A; Sutter, Bradley M; Rao, Maddamsetti; Bashir, Chowdry M

    2016-03-01

    To implement an electronic laboratory utilization management system (laboratory expert system [LES]) to provide safe and effective reductions in unnecessary clinical laboratory testing. The LES is a set of frequency filter subroutines within the Veterans Affairs hospital and laboratory information system that was formulated by an interdisciplinary medical team. Since implementing the LES, total test volume has decreased by a mean of 11.18% per year compared with our pre-LES test volume. This change was not attributable to fluctuations in outpatient visits or inpatient days of care. Laboratory cost savings were estimated at $151,184 and $163,751 for 2012 and 2013, respectively. A significant portion of these cost savings was attributable to reductions in high-volume, large panel testing. No adverse effects on patient care were reported, and mean length of stay for patients remained unchanged. Electronic laboratory utilization systems can effectively reduce unnecessary laboratory testing without compromising patient care. Published by Oxford University Press on behalf of the American Society for Clinical Pathology, 2016. This work is written by US Government employees and is in the public domain in the US.

  6. Shifting the burden or expanding access to care? Assessing malaria trends following scale-up of community health worker malaria case management and reactive case detection.

    PubMed

    Larsen, David A; Winters, Anna; Cheelo, Sanford; Hamainza, Busiku; Kamuliwo, Mulakwa; Miller, John M; Bridges, Daniel J

    2017-11-02

    Malaria is a significant burden to health systems and is responsible for a large proportion of outpatient cases at health facilities in endemic regions. The scale-up of community management of malaria and reactive case detection likely affect both malaria cases and outpatient attendance at health facilities. Using health management information data from 2012 to 2013 this article examines health trends before and after the training of volunteer community health workers to test and treat malaria cases in Southern Province, Zambia. An estimated 50% increase in monthly reported malaria infections was found when community health workers were involved with malaria testing and treating in the community (incidence rate ratio 1.52, p < 0.001). Furthermore, an estimated 6% decrease in outpatient attendance at the health facility was found when community health workers were involved with malaria testing and treating in the community. These results suggest a large public health benefit to both community case management of malaria and reactive case detection. First, the capacity of the malaria surveillance system to identify malaria infections was increased by nearly one-third. Second, the outpatient attendance at health facilities was modestly decreased. Expanding the capacity of the malaria surveillance programme through systems such as community case management and reactive case detection is an important step toward malaria elimination.

  7. Prototype solar heating and combined heating cooling systems

    NASA Technical Reports Server (NTRS)

    1978-01-01

    The design and development of eight prototype solar heating and combined heating and cooling systems is discussed. The program management and systems engineering are reported, and operational test sites are identified.

  8. Multimedial data base and management system for self-education and testing the students' knowledge on pathomorphology.

    PubMed

    Szymaś, J; Gawroński, M

    1993-01-01

    The composition assumed our experience in creating and using multimedial data base of examination questions and management system, which is used for. This system is implemented on microcomputers compatible with IBM PC and works in network system Net Ware 3.11. The test questions exceeded 2000 until now. The packet consists of the two functionally individual programs: ASSISTANT, which is the administrator for the databases, and EXAMINATOR which is the executive program. This system enables to use text files and add images to each question, which are adjusted to display on standard graphics devices (VGA). Standard format of the notation files enables to elaborate the results in order to estimate the scale of answers and to find correlations between the results.

  9. Spacecraft systems engineering: An introduction to the process at GSFC

    NASA Technical Reports Server (NTRS)

    Fragomeni, Tony; Ryschkewitsch, Michael G.

    1993-01-01

    The main objective in systems engineering is to devise a coherent total system design capable of achieving the stated requirements. Requirements should be rigid. However, they should be continuously challenged, rechallenged and/or validated. The systems engineer must specify every requirement in order to design, document, implement and conduct the mission. Each and every requirement must be logically considered, traceable and evaluated through various analysis and trade studies in a total systems design. Margins must be determined to be realistic as well as adequate. The systems engineer must also continuously close the loop and verify system performance against the requirements. The fundamental role of the systems engineer, however, is to engineer, not manage. Yet, in large, complex missions, where more than one systems engineer is required, someone needs to manage the systems engineers, and we call them 'systems managers.' Systems engineering management is an overview function which plans, guides, monitors and controls the technical execution of a project as implemented by the systems engineers. As the project moves on through Phases A and B into Phase C/D, the systems engineering tasks become a small portion of the total effort. The systems management role increases since discipline subsystem engineers are conducting analyses and reviewing test data for final review and acceptance by the systems managers.

  10. Personal Value Systems of Union Leaders and Corporate Managers: A Comparative Study.

    DTIC Science & Technology

    LABOR UNIONS, LEADERSHIP ), (*SUPERVISORS, BEHAVIOR), (*PERFORMANCE(HUMAN), ANALOG SYSTEMS), MATHEMATICAL MODELS, CORRELATION TECHNIQUES, ATTITUDES(PSYCHOLOGY), PSYCHOLOGICAL TESTS, PROBABILITY, INDUSTRIAL RELATIONS

  11. [On-line data management system using a portable blood gas analyzer in the operating room].

    PubMed

    Shimosato, G; Ibuki, T; Hirata, M; Shigemi, K; Tanaka, Y

    2000-03-01

    It is very important to establish a clinical testing system which is not only prompt, simple and accurate but also safe for the patients and medical staff in the operating room, emergency room and intensive care unit. In our institution an i-STAT portable blood gas analyser has been widely used for point of care testing in all the operating rooms. This clinical testing system has been upgraded by adding an i-STAT communication protocol to our online data management system. The analysed data transmitted by the i-STAT as an infrared signal is transformed to an electronic signal through the IR link and sent to the central data station (CDS) via RS232C. The data received by the CDS is then sent to the upper grade computer system where the data is recorded on the hard disk. One advantage of this system is that it is connected to the hospital computer system. Not only does this new system meet the need for accurate, safe, effective and economical laboratory testing, but also retrospective and multifactorial analysis of intraoperative events can be easily carried out. In the future this system can be applied to telemedicine through the Internet and contribute to the treatment of critically ill patients.

  12. Armored Family of Vehicles (AFV) Automation and Communication. Resource Management Plan (ACRMP). Phase 1. Volume 15.

    DTIC Science & Technology

    1987-09-01

    The AFV ACRMP is the Task Force Director’s (08) tool to manage command, control, communication (C3) automation system life cycle developments for the...responsibilities, development management, acquisition strategy, testing , life cycle support, technology assessment and work group relationships. ACRMP

  13. 78 FR 48541 - Agency Information Collection Activities: Requests for Comments; Clearance of Renewed Approval of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-08

    ... Management Information System testing information, and to communicate with entities subject to the program... Office of Information and Regulatory Affairs, Office of Management and Budget. Comments should be... Information and Regulatory Affairs, Office of Management and Budget, Docket Library, Room 10102, 725 17th...

  14. An early-killed rye cover crop has potential for weed management in edamame

    USDA-ARS?s Scientific Manuscript database

    The potential role of fall-seeded cover crops for weed management in edamame is unknown. Field experiments were conducted over three edamame growing seasons to test the following objectives: 1) determine the extent to which cover crop residue management systems influence edamame emergence while sele...

  15. Safely Enabling UAS Operations in Low-Altitude Airspace

    NASA Technical Reports Server (NTRS)

    Kopardekar, Parimal

    2017-01-01

    NASA is developing a system to safely enable low altitude unmanned aerial system (UAS) operations. The system is referred to as UAS Traffic Management (UTM). The UTM will safely enable a variety of business models and multiple operations in the same airspace. The UTM will provide services such as airspace configuration and geo-fencing, weather and wind integration, demand-capacity imbalance management, and separation management, and contingency management. The UTM research and development has been conducted in collaboration with many in industry, academia, and government. The UTM system will evolve through four builds. Each build will be collaboratively tested with partners. The final prototype will be available for persistent daily use of UAS operations beyond visual line of sight (BVLOS).

  16. Analytical concepts for health management systems of liquid rocket engines

    NASA Technical Reports Server (NTRS)

    Williams, Richard; Tulpule, Sharayu; Hawman, Michael

    1990-01-01

    Substantial improvement in health management systems performance can be realized by implementing advanced analytical methods of processing existing liquid rocket engine sensor data. In this paper, such techniques ranging from time series analysis to multisensor pattern recognition to expert systems to fault isolation models are examined and contrasted. The performance of several of these methods is evaluated using data from test firings of the Space Shuttle main engines.

  17. A CMMI-based approach for medical software project life cycle study.

    PubMed

    Chen, Jui-Jen; Su, Wu-Chen; Wang, Pei-Wen; Yen, Hung-Chi

    2013-01-01

    In terms of medical techniques, Taiwan has gained international recognition in recent years. However, the medical information system industry in Taiwan is still at a developing stage compared with the software industries in other nations. In addition, systematic development processes are indispensable elements of software development. They can help developers increase their productivity and efficiency and also avoid unnecessary risks arising during the development process. Thus, this paper presents an application of Light-Weight Capability Maturity Model Integration (LW-CMMI) to Chang Gung Medical Research Project (CMRP) in the Nuclear medicine field. This application was intended to integrate user requirements, system design and testing of software development processes into three layers (Domain, Concept and Instance) model. Then, expressing in structural System Modeling Language (SysML) diagrams and converts part of the manual effort necessary for project management maintenance into computational effort, for example: (semi-) automatic delivery of traceability management. In this application, it supports establishing artifacts of "requirement specification document", "project execution plan document", "system design document" and "system test document", and can deliver a prototype of lightweight project management tool on the Nuclear Medicine software project. The results of this application can be a reference for other medical institutions in developing medical information systems and support of project management to achieve the aim of patient safety.

  18. 49 CFR 199.229 - Reporting of alcohol testing results.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 3 2013-10-01 2013-10-01 false Reporting of alcohol testing results. 199.229... ALCOHOL TESTING Alcohol Misuse Prevention Program § 199.229 Reporting of alcohol testing results. (a) Each... alcohol testing results using the Management Information System (MIS) form and instructions as required by...

  19. 49 CFR 199.229 - Reporting of alcohol testing results.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 3 2012-10-01 2012-10-01 false Reporting of alcohol testing results. 199.229... ALCOHOL TESTING Alcohol Misuse Prevention Program § 199.229 Reporting of alcohol testing results. (a) Each... alcohol testing results using the Management Information System (MIS) form and instructions as required by...

  20. 49 CFR 199.229 - Reporting of alcohol testing results.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 3 2014-10-01 2014-10-01 false Reporting of alcohol testing results. 199.229... ALCOHOL TESTING Alcohol Misuse Prevention Program § 199.229 Reporting of alcohol testing results. (a) Each... alcohol testing results using the Management Information System (MIS) form and instructions as required by...

  1. 49 CFR 199.229 - Reporting of alcohol testing results.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Reporting of alcohol testing results. 199.229... ALCOHOL TESTING Alcohol Misuse Prevention Program § 199.229 Reporting of alcohol testing results. (a) Each... alcohol testing results using the Management Information System (MIS) form and instructions as required by...

  2. 49 CFR 199.229 - Reporting of alcohol testing results.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Reporting of alcohol testing results. 199.229... ALCOHOL TESTING Alcohol Misuse Prevention Program § 199.229 Reporting of alcohol testing results. (a) Each... alcohol testing results using the Management Information System (MIS) form and instructions as required by...

  3. Comprehensive Instructional Management System (CIMS). A Cyclical Mathematics Curriculum. Workbook Part 2. Experimental. Level K.

    ERIC Educational Resources Information Center

    New York City Board of Education, Brooklyn, NY. Div. of Curriculum and Instruction.

    This document is part 2 of the workbook for kindergarten pupils in the Comprehensive Instructional Management System, a unified mathematics curriculum for kindergarten through grade 7. Each objective is developed by a variety of strategies, with mastery of objectives diagnosed through a testing component. The activities in the student workbook are…

  4. Development of a Student-Paced Course in General Pathology Utilizing a Computer Managed Evaluation System.

    ERIC Educational Resources Information Center

    Kent, Thomas H.; And Others

    The advantages, feasibility and problems associated with a student-paced course were investigated, and a computer managed evaluation system compared to paper and pencil testing mode. The development of a self-paced course was facilitated by explicit behavior objectives, a variety of learning materials referenced to the objectives and a large pool…

  5. A Study to Determine the Effectiveness of a Positive Approach to Discipline System for Classroom Management.

    ERIC Educational Resources Information Center

    Allen, Sherwin

    To test the effectiveness of the Positive Approach to Discipline (PAD) System of classroom management, this study examined changes in the incidence of administrative disciplinary referrals, corporal punishment, and school suspensions in an urban Southwest public middle school. The 13-step PAD procedure--incorporating counseling, problem-solving,…

  6. 21 CFR 862.3840 - Sirolimus test system.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Sirolimus test system. 862.3840 Section 862.3840 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED... quantitatively determine sirolimus concentrations in whole blood. Measurements are used as an aid in management...

  7. Unmanned Aircraft Systems Traffic Management (UTM): Safely Enabling UAS Operations in Low-Altitude Airspace

    NASA Technical Reports Server (NTRS)

    Homola, Jeffrey; Owens, Brandon

    2017-01-01

    This is a presentation for a Cisco Internet of Things (IoT) Systems Engineering Virtual Training (SEVT) event. The presentation provides an overview of the UTM concept, architecture, flight test events, and lessons learned. Networking hardware used in support of flight tests is also described.

  8. Cost accounting, management control, and planning in health care.

    PubMed

    Siegrist, R B; Blish, C S

    1988-02-01

    Advantages and pharmacy applications of computerized hospital management-control and planning systems are described. Hospitals must define their product lines; patient cases, not tests or procedures, are the end product. Management involves operational control, management control, and strategic planning. Operational control deals with day-to-day management on the task level. Management control involves ensuring that managers use resources effectively and efficiently to accomplish the organization's objectives. Management control includes both control of unit costs of intermediate products, which are procedures and services used to treat patients and are managed by hospital department heads, and control of intermediate product use per case (managed by the clinician). Information from the operation and management levels feeds into the strategic plan; conversely, the management level controls the plan and the operational level carries it out. In the system developed at New England Medical Center, Boston, Massachusetts, the intermediate product-management system enables managers to identify intermediate products, develop standard costs, simulate changes in departmental costs, and perform variance analysis. The end-product management system creates a patient-level data-base, identifies end products (patient-care groupings), develops standard resource protocols, models alternative assumptions, performs variance analysis, and provides concurrent reporting. Examples are given of pharmacy managers' use of such systems to answer questions in the areas of product costing, product pricing, variance analysis, productivity monitoring, flexible budgeting, modeling and planning, and comparative analysis.(ABSTRACT TRUNCATED AT 250 WORDS)

  9. Space Station Environmental Control and Life Support System Test Facility at Marshall Space Flight Center

    NASA Technical Reports Server (NTRS)

    Springer, Darlene

    1989-01-01

    Different aspects of Space Station Environmental Control and Life Support System (ECLSS) testing are currently taking place at Marshall Space Flight Center (MSFC). Unique to this testing is the variety of test areas and the fact that all are located in one building. The north high bay of building 4755, the Core Module Integration Facility (CMIF), contains the following test areas: the Subsystem Test Area, the Comparative Test Area, the Process Material Management System (PMMS), the Core Module Simulator (CMS), the End-use Equipment Facility (EEF), and the Pre-development Operational System Test (POST) Area. This paper addresses the facility that supports these test areas and briefly describes the testing in each area. Future plans for the building and Space Station module configurations will also be discussed.

  10. Combustion of liquid paint wastes in fluidized bed boiler as element of waste management system in the paint factory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Soko, W.A.; Biaecka, B.

    1998-12-31

    In this paper the solution to waste problems in the paint industry is presented by describing their combustion in a fluidized bed boiler as a part of the waste management system in the paint factory. Based on the Cleaner Production idea and concept of integration of design process with a future exploitation of equipment, some modifications of the waste management scheme in the factory are discussed to reduce the quantity of toxic wastes. To verify this concept combustion tests of paint production wastes and cocombustion of paint wastes with coal in an adopted industrial boiler were done. Results of thesemore » tests are presented in the paper.« less

  11. IceVal DatAssistant: An Interactive, Automated Icing Data Management System

    NASA Technical Reports Server (NTRS)

    Levinson, Laurie H.; Wright, William B.

    2008-01-01

    As with any scientific endeavor, the foundation of icing research at the NASA Glenn Research Center (GRC) is the data acquired during experimental testing. In the case of the GRC Icing Branch, an important part of this data consists of ice tracings taken following tests carried out in the GRC Icing Research Tunnel (IRT), as well as the associated operational and environmental conditions documented during these tests. Over the years, the large number of experimental runs completed has served to emphasize the need for a consistent strategy for managing this data. To address the situation, the Icing Branch has recently elected to implement the IceVal DatAssistant automated data management system. With the release of this system, all publicly available IRT-generated experimental ice shapes with complete and verifiable conditions have now been compiled into one electronically-searchable database. Simulation software results for the equivalent conditions, generated using the latest version of the LEWICE ice shape prediction code, are likewise included and are linked to the corresponding experimental runs. In addition to this comprehensive database, the IceVal system also includes a graphically-oriented database access utility, which provides reliable and easy access to all data contained in the database. In this paper, the issues surrounding historical icing data management practices are discussed, as well as the anticipated benefits to be achieved as a result of migrating to the new system. A detailed description of the software system features and database content is also provided; and, finally, known issues and plans for future work are presented.

  12. IceVal DatAssistant: An Interactive, Automated Icing Data Management System

    NASA Technical Reports Server (NTRS)

    Levinson, Laurie H.; Wright, William B.

    2008-01-01

    As with any scientific endeavor, the foundation of icing research at the NASA Glenn Research Center (GRC) is the data acquired during experimental testing. In the case of the GRC Icing Branch, an important part of this data consists of ice tracings taken following tests carried out in the GRC Icing Research Tunnel (IRT), as well as the associated operational and environmental conditions during those tests. Over the years, the large number of experimental runs completed has served to emphasize the need for a consistent strategy to manage the resulting data. To address this situation, the Icing Branch has recently elected to implement the IceVal DatAssistant automated data management system. With the release of this system, all publicly available IRT-generated experimental ice shapes with complete and verifiable conditions have now been compiled into one electronically-searchable database; and simulation software results for the equivalent conditions, generated using the latest version of the LEWICE ice shape prediction code, are likewise included and linked to the corresponding experimental runs. In addition to this comprehensive database, the IceVal system also includes a graphically-oriented database access utility, which provides reliable and easy access to all data contained in the database. In this paper, the issues surrounding historical icing data management practices are discussed, as well as the anticipated benefits to be achieved as a result of migrating to the new system. A detailed description of the software system features and database content is also provided; and, finally, known issues and plans for future work are presented.

  13. 76 FR 80781 - Alcohol and Drug Testing: Determination of Minimum Random Testing Rates for 2012

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-27

    ...-11213, Notice No. 15] RIN 2130-AA81 Alcohol and Drug Testing: Determination of Minimum Random Testing.... According to data from FRA's Management Information System, the rail industry's random drug testing [[Page... Administrator (Administrator) has therefore determined that the minimum annual random drug testing rate for the...

  14. 77 FR 75896 - Alcohol and Drug Testing: Determination of Minimum Random Testing Rates for 2013

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-26

    ...-11213, Notice No. 16] Alcohol and Drug Testing: Determination of Minimum Random Testing Rates for 2013... from FRA's Management Information System, the rail industry's random drug testing positive rate has... therefore determined that the minimum annual random drug testing rate for the period January 1, 2013...

  15. Demonstrations of Clarus system data : Clarus BAA projects.

    DOT National Transportation Integrated Search

    2005-08-01

    In 2002, FHWA awarded a field operational test to the Virginia Department of Transportation entitled (VDOT) Traffic Management Center (TMC) Applications of Archived Data Operational Test. The intent of the operational test was to use archived data to...

  16. Simultaneous real-time data collection methods

    NASA Technical Reports Server (NTRS)

    Klincsek, Thomas

    1992-01-01

    This paper describes the development of electronic test equipment which executes, supervises, and reports on various tests. This validation process uses computers to analyze test results and report conclusions. The test equipment consists of an electronics component and the data collection and reporting unit. The PC software, display screens, and real-time data-base are described. Pass-fail procedures and data replay are discussed. The OS2 operating system and Presentation Manager user interface system were used to create a highly interactive automated system. The system outputs are hardcopy printouts and MS DOS format files which may be used as input for other PC programs.

  17. A resource-dependence model of hospital contract management.

    PubMed Central

    Alexander, J A; Morrisey, M A

    1989-01-01

    This study empirically examines the determinants of hospital entry into management contracts with multihospital systems. Using a resource-dependence framework, the study tests whether market conditions, regulatory climate, management effectiveness, and certain enabling factors affect the probability of hospital entry into a contract management arrangement. The study used a pooled sample of 312 contract-managed and 936 traditionally managed hospitals. Results suggest the importance of management effectiveness, regulatory climate, and hospital ownership (investor owned or nonprofit) as predisposing conditions of contract management. PMID:2732059

  18. The representation of manipulable solid objects in a relational database

    NASA Technical Reports Server (NTRS)

    Bahler, D.

    1984-01-01

    This project is concerned with the interface between database management and solid geometric modeling. The desirability of integrating computer-aided design, manufacture, testing, and management into a coherent system is by now well recognized. One proposed configuration for such a system uses a relational database management system as the central focus; the various other functions are linked through their use of a common data repesentation in the data manager, rather than communicating pairwise to integrate a geometric modeling capability with a generic relational data managemet system in such a way that well-formed questions can be posed and answered about the performance of the system as a whole. One necessary feature of any such system is simplification for purposes of anaysis; this and system performance considerations meant that a paramount goal therefore was that of unity and simplicity of the data structures used.

  19. Design of biomass management systems and components for closed loop life support systems

    NASA Technical Reports Server (NTRS)

    Nevill, Gale E., Jr.

    1991-01-01

    The design of a biomass management system (BMS) for use in a closed loop support system is presented by University of Florida students as the culmination of two design courses. The report is divided into two appendixes, each presenting the results of one of the design courses. The first appendix discusses the preliminary design of the biomass management system and is subdivided into five subsystems: (1) planting and harvesting, (2) food management, (3) resource recovery, (4) refurbishing, and (5) transport. Each subsystem is investigated for possible solutions to problems, and recommendations and conclusions for an integrated BMS are discussed. The second appendix discusses the specific design of components for the BMS and is divided into three sections: (1) a sectored plant growth unit with support systems, (2) a container and receiving mechanism, and (3) an air curtain system for fugitive particle control. In this section components are designed, fabricated, and tested.

  20. Testing SLURM open source batch system for a Tierl/Tier2 HEP computing facility

    NASA Astrophysics Data System (ADS)

    Donvito, Giacinto; Salomoni, Davide; Italiano, Alessandro

    2014-06-01

    In this work the testing activities that were carried on to verify if the SLURM batch system could be used as the production batch system of a typical Tier1/Tier2 HEP computing center are shown. SLURM (Simple Linux Utility for Resource Management) is an Open Source batch system developed mainly by the Lawrence Livermore National Laboratory, SchedMD, Linux NetworX, Hewlett-Packard, and Groupe Bull. Testing was focused both on verifying the functionalities of the batch system and the performance that SLURM is able to offer. We first describe our initial set of requirements. Functionally, we started configuring SLURM so that it replicates all the scheduling policies already used in production in the computing centers involved in the test, i.e. INFN-Bari and the INFN-Tier1 at CNAF, Bologna. Currently, the INFN-Tier1 is using IBM LSF (Load Sharing Facility), while INFN-Bari, an LHC Tier2 for both CMS and Alice, is using Torque as resource manager and MAUI as scheduler. We show how we configured SLURM in order to enable several scheduling functionalities such as Hierarchical FairShare, Quality of Service, user-based and group-based priority, limits on the number of jobs per user/group/queue, job age scheduling, job size scheduling, and scheduling of consumable resources. We then show how different job typologies, like serial, MPI, multi-thread, whole-node and interactive jobs can be managed. Tests on the use of ACLs on queues or in general other resources are then described. A peculiar SLURM feature we also verified is triggers on event, useful to configure specific actions on each possible event in the batch system. We also tested highly available configurations for the master node. This feature is of paramount importance since a mandatory requirement in our scenarios is to have a working farm cluster even in case of hardware failure of the server(s) hosting the batch system. Among our requirements there is also the possibility to deal with pre-execution and post-execution scripts, and controlled handling of the failure of such scripts. This feature is heavily used, for example, at the INFN-Tier1 in order to check the health status of a worker node before execution of each job. Pre- and post-execution scripts are also important to let WNoDeS, the IaaS Cloud solution developed at INFN, use SLURM as its resource manager. WNoDeS has already been supporting the LSF and Torque batch systems for some time; in this work we show the work done so that WNoDeS supports SLURM as well. Finally, we show several performance tests that we carried on to verify SLURM scalability and reliability, detailing scalability tests both in terms of managed nodes and of queued jobs.

  1. Implications of the introduction of laboratory demand management at primary care clinics in South Africa on laboratory expenditure

    PubMed Central

    Lekalakala, Ruth; Asmall, Shaidah; Cassim, Naseem

    2016-01-01

    Background Diagnostic health laboratory services are regarded as an integral part of the national health infrastructure across all countries. Clinical laboratory tests contribute substantially to health system goals of increasing quality of care and improving patient outcomes. Objectives This study aimed to analyse current laboratory expenditures at the primary healthcare (PHC) level in South Africa as processed by the National Health Laboratory Service and to determine the potential cost savings of introducing laboratory demand management. Methods A retrospective cross-sectional analysis of laboratory expenditures for the 2013/2014 financial year across 11 pilot National Health Insurance health districts was conducted. Laboratory expenditure tariff codes were cross-tabulated to the PHC essential laboratory tests list (ELL) to determine inappropriate testing. Data were analysed using a Microsoft Access database and Excel software. Results Approximately R35 million South African Rand (10%) of the estimated R339 million in expenditures was for tests that were not listed within the ELL. Approximately 47% of expenditure was for laboratory tests that were indicated in the algorithmic management of patients on antiretroviral treatment. The other main cost drivers for non-ELL testing included full blood count and urea, as well as electrolyte profiles usually requested to support management of patients on antiretroviral treatment. Conclusions Considerable annual savings of up to 10% in laboratory expenditure are possible at the PHC level by implementing laboratory demand management. In addition, to achieve these savings, a standardised PHC laboratory request form and some form of electronic gatekeeping system that must be supported by an educational component should be implemented. PMID:28879107

  2. Adaptive management for soil ecosystem services

    USGS Publications Warehouse

    Birge, Hannah E.; Bevans, Rebecca A.; Allen, Craig R.; Angeler, David G.; Baer, Sara G.; Wall, Diana H.

    2016-01-01

    Ecosystem services provided by soil include regulation of the atmosphere and climate, primary (including agricultural) production, waste processing, decomposition, nutrient conservation, water purification, erosion control, medical resources, pest control, and disease mitigation. The simultaneous production of these multiple services arises from complex interactions among diverse aboveground and belowground communities across multiple scales. When a system is mismanaged, non-linear and persistent losses in ecosystem services can arise. Adaptive management is an approach to management designed to reduce uncertainty as management proceeds. By developing alternative hypotheses, testing these hypotheses and adjusting management in response to outcomes, managers can probe dynamic mechanistic relationships among aboveground and belowground soil system components. In doing so, soil ecosystem services can be preserved and critical ecological thresholds avoided. Here, we present an adaptive management framework designed to reduce uncertainty surrounding the soil system, even when soil ecosystem services production is not the explicit management objective, so that managers can reach their management goals without undermining soil multifunctionality or contributing to an irreversible loss of soil ecosystem services.

  3. Systems Engineering and Integration for Advanced Life Support System and HST

    NASA Technical Reports Server (NTRS)

    Kamarani, Ali K.

    2005-01-01

    Systems engineering (SE) discipline has revolutionized the way engineers and managers think about solving issues related to design of complex systems: With continued development of state-of-the-art technologies, systems are becoming more complex and therefore, a systematic approach is essential to control and manage their integrated design and development. This complexity is driven from integration issues. In this case, subsystems must interact with one another in order to achieve integration objectives, and also achieve the overall system's required performance. Systems engineering process addresses these issues at multiple levels. It is a technology and management process dedicated to controlling all aspects of system life cycle to assure integration at all levels. The Advanced Integration Matrix (AIM) project serves as the systems engineering and integration function for the Human Support Technology (HST) program. AIM provides means for integrated test facilities and personnel for performance trade studies, analyses, integrated models, test results, and validated requirements of the integration of HST. The goal of AIM is to address systems-level integration issues for exploration missions. It will use an incremental systems integration approach to yield technologies, baselines for further development, and possible breakthrough concepts in the areas of technological and organizational interfaces, total information flow, system wide controls, technical synergism, mission operations protocols and procedures, and human-machine interfaces.

  4. An environmental testing facility for Space Station Freedom power management and distribution hardware

    NASA Technical Reports Server (NTRS)

    Jackola, Arthur S.; Hartjen, Gary L.

    1992-01-01

    The plans for a new test facility, including new environmental test systems, which are presently under construction, and the major environmental Test Support Equipment (TSE) used therein are addressed. This all-new Rocketdyne facility will perform space simulation environmental tests on Power Management and Distribution (PMAD) hardware to Space Station Freedom (SSF) at the Engineering Model, Qualification Model, and Flight Model levels of fidelity. Testing will include Random Vibration in three axes - Thermal Vacuum, Thermal Cycling and Thermal Burn-in - as well as numerous electrical functional tests. The facility is designed to support a relatively high throughput of hardware under test, while maintaining the high standards required for a man-rated space program.

  5. Engineering Development Program of a Closed Aluminum-Oxygen Semi-cell System for an Unmanned Underwater Vehicle: An Update

    NASA Technical Reports Server (NTRS)

    Gregg, Dane W.; Hall, Susan E.

    1996-01-01

    Most emerging unmanned undersea vehicle (UUV) missions require significantly longer range and endurance than is achievable with existing battery technology. The Aluminum-Oxygen (Al-O2) semi-cell is a candidate technology capable of providing a significant improvement in endurance compared to the silver-zinc battery technology currently in use in UUVs and compares favorably to other proposed UUV power systems not only in performance, but also in safety and logistics. An Al-O2 semi-cell system is under development, consisting of a cell stack, gas management, oxygen storage, electrolyte management coolant and controller subsystems. It is designed to replace the existing silver-zinc battery and meet existing weight, volume, electrical and thermal requirements, therefore minimizing modification to the UUV. A detailed system design is complete. A component and material endurance test to evaluate compatibility and reliability of various materials and components is complete. Sub=scale (short stack) system testing is complete. A full-scale demonstration unit is now under construction for testing in the second half of 1995. The full scale demonstration test will simulate environmental conditions of the operational system. This paper summarizes the results of the extensive short stack and endurance test programs, describes the plan for full-scale testing, and concludes with a brief discussion of future directions for this technology.

  6. Implementing Google Apps for Education as Learning Management System in Math Education

    NASA Astrophysics Data System (ADS)

    Widodo, S.

    2017-09-01

    This study aims to find the effectiveness of math education using Google Apps for Education (GAFE) as learning management system to improve mathematical communication skill primary school preservice teacher. This research used quasi-experimental approach, utilizing the control group pre-test - post-test design of two group of primary school preservice teachers at UPI Kampus Purwakarta. The result of this study showed that mathematical communication skill of primary school preservice teacher in the experiment group is better than the control group. This is because the primary school preservice teacher in the experiment group used GAFE as a tool to communicate their idea. The students can communicate their idea because they have read the learning material on the learning management system using GAFE. All in all, it can be concluded that the communication tool is very important, beside the learning material, and also the options to choose the learning model to achieve the better result.

  7. KSC-2013-2917

    NASA Image and Video Library

    2013-06-27

    CAPE CANAVERAL, Fla. – Inside the Operations and Checkout Building high bay at NASA’s Kennedy Space Center in Florida, members of the media receive an on activities in NASA’s Ground Systems Development and Operations, or GSDO, Program, Space Launch System and Orion crew module for Exploration Test Flight 1. Speaking to the media, from left are Scott Wilson, manager of Orion Production Operations at Kennedy Larry Price, Lockheed Martin deputy program manager for Orion Tom Erdman, from Marshall Space Flight Center’s Kennedy resident office Jules Schneider, Lockheed Martin manager of Orion Production Operations and Jeremy Parsons, chief of the GSDO Operations Integration Office at Kennedy. Orion is the exploration spacecraft designed to carry crews to space beyond low Earth orbit. It will provide emergency abort capability, sustain the crew during the space travel and provide safe re-entry from deep space return velocities. Orion’s first unpiloted test flight is scheduled to launch in 2014 atop a Delta IV rocket. A second uncrewed flight test is scheduled for 2017 on NASA’s Space Launch System rocket. For more information, visit http://www.nasa.gov/orion. Photo credit: NASA/Jim Grossmann

  8. A Combined Energy Management Algorithm for Wind Turbine/Battery Hybrid System

    NASA Astrophysics Data System (ADS)

    Altin, Necmi; Eyimaya, Süleyman Emre

    2018-03-01

    From an energy management standpoint, natural phenomena such as solar irradiation and wind speed are uncontrolled variables, so the correlation between the energy generated by renewable energy sources and energy demand cannot always be predicted. For this reason, energy storage systems are used to provide more efficient renewable energy systems. In these systems, energy management systems are used to control the energy storage system and establish a balance between the generated power and the power demand. In addition, especially in wind turbines, rapidly varying wind speeds cause wind power fluctuations, which threaten the power system stability, especially at high power levels. Energy storage systems are also used to mitigate the power fluctuations and sustain the power system's stability. In these systems, another controller which controls the energy storage system power to mitigate power fluctuations is required. These two controllers are different from each other. In this study, a combined energy management algorithm is proposed which can perform both as an energy control system and a power fluctuation mitigation system. The proposed controller is tested with wind energy conversion system modeled in MATLAB/Simulink. Simulation results show that the proposed controller acts as an energy management system while, at the same time, mitigating power fluctuations.

  9. Stream processing health card application.

    PubMed

    Polat, Seda; Gündem, Taflan Imre

    2012-10-01

    In this paper, we propose a data stream management system embedded to a smart card for handling and storing user specific summaries of streaming data coming from medical sensor measurements and/or other medical measurements. The data stream management system that we propose for a health card can handle the stream data rates of commonly known medical devices and sensors. It incorporates a type of context awareness feature that acts according to user specific information. The proposed system is cheap and provides security for private data by enhancing the capabilities of smart health cards. The stream data management system is tested on a real smart card using both synthetic and real data.

  10. Evaluation of a video image detection system : final report.

    DOT National Transportation Integrated Search

    1994-05-01

    A video image detection system (VIDS) is an advanced wide-area traffic monitoring system : that processes input from a video camera. The Autoscope VIDS coupled with an information : management system was selected as the monitoring device because test...

  11. Space station data system analysis/architecture study. Task 3: Trade studies, DR-5, volume 2

    NASA Technical Reports Server (NTRS)

    1985-01-01

    Results of a Space Station Data System Analysis/Architecture Study for the Goddard Space Flight Center are presented. This study, which emphasized a system engineering design for a complete, end-to-end data system, was divided into six tasks: (1); Functional requirements definition; (2) Options development; (3) Trade studies; (4) System definitions; (5) Program plan; and (6) Study maintenance. The Task inter-relationship and documentation flow are described. Information in volume 2 is devoted to Task 3: trade Studies. Trade Studies have been carried out in the following areas: (1) software development test and integration capability; (2) fault tolerant computing; (3) space qualified computers; (4) distributed data base management system; (5) system integration test and verification; (6) crew workstations; (7) mass storage; (8) command and resource management; and (9) space communications. Results are presented for each task.

  12. Assuring the Quality of Test Results in the Field of Nuclear Techniques and Ionizing Radiation. The Practical Implementation of Section 5.9 of the EN ISO/IEC 17025 Standard

    NASA Astrophysics Data System (ADS)

    Cucu, Daniela; Woods, Mike

    2008-08-01

    The paper aims to present a practical approach for testing laboratories to ensure the quality of their test results. It is based on the experience gained in assessing a large number of testing laboratories, discussing with management and staff, reviewing results obtained in national and international PTs and ILCs and exchanging information in the EA laboratory committee. According to EN ISO/IEC 17025, an accredited laboratory has to implement a programme to ensure the quality of its test results for each measurand. Pre-analytical, analytical and post-analytical measures shall be applied in a systematic manner. They shall include both quality control and quality assurance measures. When designing the quality assurance programme a laboratory should consider pre-analytical activities (like personnel training, selection and validation of test methods, qualifying equipment), analytical activities ranging from sampling, sample preparation, instrumental analysis and post-analytical activities (like decoding, calculation, use of statistical tests or packages, management of results). Designed on different levels (analyst, quality manager and technical manager), including a variety of measures, the programme shall ensure the validity and accuracy of test results, the adequacy of the management system, prove the laboratory's competence in performing tests under accreditation and last but not least show the comparability of test results. Laboratory management should establish performance targets and review periodically QC/QA results against them, implementing appropriate measures in case of non-compliance.

  13. Power Hardware-in-the-Loop Testing of a Smart Distribution System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mendoza Carrillo, Ismael; Breaden, Craig; Medley, Paige

    This paper presents the results of the third and final phase of the National Renewable Energy Lab (NREL) INTEGRATE demonstration: Smart Distribution. For this demonstration, high penetrations of solar PV and wind energy systems were simulated in a power hardware-in-the-loop set-up using a smart distribution test feeder. Simulated and real DERs were controlled by a real-time control platform, which manages grid constraints under high clean energy deployment levels. The power HIL testing, conducted at NREL's ESIF smart power lab, demonstrated how dynamically managing DER increases the grid's hosting capacity by leveraging active network management's (ANM) safe and reliable control framework.more » Results are presented for how ANM's real-time monitoring, automation, and control can be used to manage multiple DERs and multiple constraints associated with high penetrations of DER on a distribution grid. The project also successfully demonstrated the importance of escalating control actions given how ANM enables operation of grid equipment closer to their actual physical limit in the presence of very high levels of intermittent DER.« less

  14. Connected vehicle enabled freeway merge management - field test.

    DOT National Transportation Integrated Search

    2016-01-01

    Freeway congestion is a major problem of the transportation system, resulting in major economic : loss in terms of traffic delays and fuel costs. With connected vehicle (CV) technologies, more : proactive traffic management strategies are possible. T...

  15. The Advanced Communication Technology Satellite and ISDN

    NASA Technical Reports Server (NTRS)

    Lowry, Peter A.

    1996-01-01

    This paper depicts the Advanced Communication Technology Satellite (ACTS) system as a global central office switch. The ground portion of the system is the collection of earth stations or T1-VSAT's (T1 very small aperture terminals). The control software for the T1-VSAT's resides in a single CPU. The software consists of two modules, the modem manager and the call manager. The modem manager (MM) controls the RF modem portion of the T1-VSAT. It processes the orderwires from the satellite or from signaling generated by the call manager (CM). The CM controls the Recom Laboratories MSPs by receiving signaling messages from the stacked MSP shelves ro units and sending appropriate setup commands to them. There are two methods used to setup and process calls in the CM; first by dialing up a circuit using a standard telephone handset or, secondly by using an external processor connected to the CPU's second COM port, by sending and receiving signaling orderwires. It is the use of the external processor which permits the ISDN (Integrated Services Digital Network) Signaling Processor to implement ISDN calls. In August 1993, the initial testing of the ISDN Signaling Processor was carried out at ACTS System Test at Lockheed Marietta, Princeton, NJ using the spacecraft in its test configuration on the ground.

  16. Power management and distribution system for a More-Electric Aircraft (MADMEL) -- Program status

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Maldonado, M.A.; Shah, N.M.; Cleek, K.J.

    1995-12-31

    A number of technology breakthroughs in recent years have rekindled the concept of a more-electric aircraft. High-power solid-state switching devices, electrohydrostatic actuators (EHAs), electromechanical actuators (EMAs), and high-power generators are just a few examples of component developments that have made dramatic improvements in properties such as weight, size, power, and cost. However, these components cannot be applied piecemeal. A complete, and somewhat revolutionary, system design approach is needed to exploit the benefits that a more-electric aircraft can provide. A five-phase Power Management and Distribution System for a More-Electric Aircraft (MADMEL) program was awarded by the Air Force to the Northrop/Grumman,more » Military Aircraft Division team in September 1991. The objective of the program is to design, develop, and demonstrate an advanced electrical power generation and distribution system for a more-electric aircraft (MEA). The MEA emphasizes the use of electrical power in place of hydraulics, pneumatic, and mechanical power to optimize the performance and life cycle cost of the aircraft. This paper presents an overview of the MADMEL program and a top-level summary of the program results, development and testing of major components to date. In Phase 1 and Phase 2 studies, the electrical load requirements were established and the electrical power system architecture was defined for both near-term (NT-year 1996) and far-term (FT-year 2003) MEA application. The detailed design and specification for the electrical power system (EPS), its interface with the Vehicle Management System, and the test set-up were developed under the recently completed Phase 3. The subsystem level hardware fabrication and testing will be performed under the on-going Phase 4 activities. The overall system level integration and testing will be performed in Phase 5.« less

  17. SymptomCare@Home: Developing an Integrated Symptom Monitoring and Management System for Outpatients Receiving Chemotherapy.

    PubMed

    Beck, Susan L; Eaton, Linda H; Echeverria, Christina; Mooney, Kathi H

    2017-10-01

    SymptomCare@Home, an integrated symptom monitoring and management system, was designed as part of randomized clinical trials to help patients with cancer who receive chemotherapy in ambulatory clinics and often experience significant symptoms at home. An iterative design process was informed by chronic disease management theory and features of assessment and clinical decision support systems used in other diseases. Key stakeholders participated in the design process: nurse scientists, clinical experts, bioinformatics experts, and computer programmers. Especially important was input from end users, patients, and nurse practitioners participating in a series of studies testing the system. The system includes both a patient and clinician interface and fully integrates two electronic subsystems: a telephone computer-linked interactive voice response system and a Web-based Decision Support-Symptom Management System. Key features include (1) daily symptom monitoring, (2) self-management coaching, (3) alerting, and (4) nurse practitioner follow-up. The nurse practitioner is distinctively positioned to provide assessment, education, support, and pharmacologic and nonpharmacologic interventions to intensify management of poorly controlled symptoms at home. SymptomCare@Home is a model for providing telehealth. The system facilitates using evidence-based guidelines as part of a comprehensive symptom management approach. The design process and system features can be applied to other diseases and conditions.

  18. A Survey of Health Management User Objectives Related to Diagnostic and Prognostic Metrics

    NASA Technical Reports Server (NTRS)

    Wheeler, Kevin R.; Kurtoglu, Tolga; Poll, Scott D.

    2010-01-01

    One of the most prominent technical challenges to effective deployment of health management systems is the vast difference in user objectives with respect to engineering development. In this paper, a detailed survey on the objectives of different users of health management systems is presented. These user objectives are then mapped to the metrics typically encountered in the development and testing of two main systems health management functions: diagnosis and prognosis. Using this mapping, the gaps between user goals and the metrics associated with diagnostics and prognostics are identified and presented with a collection of lessons learned from previous studies that include both industrial and military aerospace applications.

  19. Price Based Local Power Distribution Management System (Local Power Distribution Manager) v1.0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BROWN, RICHARD E.; CZARNECKI, STEPHEN; SPEARS, MICHAEL

    2016-11-28

    A trans-active energy micro-grid controller is implemented in the VOLTTRON distributed control platform. The system uses the price of electricity as the mechanism for conducting transactions that are used to manage energy use and to balance supply and demand. In order to allow testing and analysis of the control system, the implementation is designed to run completely as a software simulation, while allowing the inclusion of selected hardware that physically manages power. Equipment to be integrated with the micro-grid controller must have an IP (Internet Protocol)-based network connection and a software "driver" must exist to translate data communications between themore » device and the controller.« less

  20. Documentation of a spatial data-base management system for monitoring pesticide application in Washington

    USGS Publications Warehouse

    Schurr, K.M.; Cox, S.E.

    1994-01-01

    The Pesticide-Application Data-Base Management System was created as a demonstration project and was tested with data submitted to the Washington State Department of Agriculture by pesticide applicators from a small geographic area. These data were entered into the Department's relational data-base system and uploaded into the system's ARC/INFO files. Locations for pesticide applica- tions are assigned within the Public Land Survey System grids, and ARC/INFO programs in the Pesticide-Application Data-Base Management System can subdivide each survey section into sixteen idealized quarter-quarter sections for display map grids. The system provides data retrieval and geographic information system plotting capabilities from a menu of seven basic retrieval options. Additionally, ARC/INFO coverages can be created from the retrieved data when required for particular applications. The Pesticide-Application Data-Base Management System, or the general principles used in the system, could be adapted to other applica- tions or to other states.

  1. Test results management and distributed cognition in electronic health record-enabled primary care.

    PubMed

    Smith, Michael W; Hughes, Ashley M; Brown, Charnetta; Russo And, Elise; Giardina, Traber D; Mehta, Praveen; Singh, Hardeep

    2018-06-01

    Managing abnormal test results in primary care involves coordination across various settings. This study identifies how primary care teams manage test results in a large, computerized healthcare system in order to inform health information technology requirements for test results management and other distributed healthcare services. At five US Veterans Health Administration facilities, we interviewed 37 primary care team members, including 16 primary care providers, 12 registered nurses, and 9 licensed practical nurses. We performed content analysis using a distributed cognition approach, identifying patterns of information transmission across people and artifacts (e.g. electronic health records). Results illustrate challenges (e.g. information overload) as well as strategies used to overcome challenges. Various communication paths were used. Some team members served as intermediaries, processing information before relaying it. Artifacts were used as memory aids. Health information technology should address the risks of distributed work by supporting awareness of team and task status for reliable management of results.

  2. Shifting from presumptive to test-based management of malaria - technical basis and implications for malaria control in Ghana.

    PubMed

    Baiden, F; Malm, K; Bart-Plange, C; Hodgson, A; Chandramohan, D; Webster, J; Owusu-Agyei, S

    2014-06-01

    The presumptive approach was the World Health Organisation (WHO) recommended to the management of malaria for many years and this was incorporated into syndromic guidelines such as the Integrated Management of Childhood Illnesses (IMCI). In early 2010 however, WHO issued revised treatment guidelines that call for a shift from the presumptive to the test-based approach. Practically, this implies that in all suspected cases, the diagnosis of uncomplicated malaria should be confirmed using rapid test before treatment is initiated. This revision effectively brings to an end an era of clinical practice that span several years. Its implementation has important implications for the health systems in malaria-endemic countries. On the basis of research in Ghana and other countries, and evidence from program work, the Ghana National Malaria Control Program has issued revised national treatment guidelines that call for implementation of test-based management of malaria in all cases, and across all age groups. This article reviews the evidence and the technical basis for the shift to test-based management and examines the implications for malaria control in Ghana.

  3. Managing computer-controlled operations

    NASA Technical Reports Server (NTRS)

    Plowden, J. B.

    1985-01-01

    A detailed discussion of Launch Processing System Ground Software Production is presented to establish the interrelationships of firing room resource utilization, configuration control, system build operations, and Shuttle data bank management. The production of a test configuration identifier is traced from requirement generation to program development. The challenge of the operational era is to implement fully automated utilities to interface with a resident system build requirements document to eliminate all manual intervention in the system build operations. Automatic update/processing of Shuttle data tapes will enhance operations during multi-flow processing.

  4. Distributed Common Ground System - Army (DCGS-A) Increment 1 Release 2 Follow-on Operational Test and Evaluation (FOT and E) Report

    DTIC Science & Technology

    2016-01-01

    Moving Target Indicator, Unmanned Aircraft System (UAS), Rivet Joint, U-2, and ground signals intelligence (PROPHET). At the BCT, Ranger Regiment and... metadata catalog managed by the DIB management office (outside of the DCGS-A system ). A metadata is a searchable description of data, and users across...challenge for users . The system required reboots about every 20 hours for users who had heavy workloads such as the fire support analysts and data

  5. Report of the National Sub-Committee to the Interprovincial Standards Program Coordinating Committee on the Interprovincial Computerized Examination Management System=Rapport du Sous-Comite National presente au Comite de Coordination du Programme de Normes Interprovincials sur le systeme de gestion des examens informatises interprovinciaux.

    ERIC Educational Resources Information Center

    New Brunswick Dept. of Advanced Education and Training, Fredericton. Interprovincial Standards Program Coordinating Committee.

    In January 1985, Employment and Immigration Canada funded a pilot project in New Brunswick for the development and testing of an Interprovincial Computerized Examination Management (ICEM) System. The resulting system is comprised of a dual interprovincial and provincial item bank facility, a software component offering the option of computerized…

  6. Previously Identified Deficiencies Not Corrected in the General Fund Enterprise Business System Program

    DTIC Science & Technology

    2011-06-15

    Army AAA Report No. A-2009-0226- FFM , “Examination of Federal Financial Management Improvement Act Compliance - Test Validation General Fund Enterprise...Business System Release 1.2,” September 30, 2009 AAA Report No. A-2009-0231- FFM , “General Fund Enterprise Business System - Federal Financial...Management Improvement Act Compliance Examination of Release 1.3 Functionality,” September 30, 2009 AAA Report No. A-2009-0232- FFM , “General Fund

  7. Low-temperature plasma technology as part of a closed-loop resource management system

    NASA Technical Reports Server (NTRS)

    Hetland, Melanie D.; Rindt, John R.; Jones, Frank A.; Sauer, Randal S.

    1990-01-01

    The results of this testing indicate that the agitated low-temperature plasma reactor system successfully converted carbon, hydrogen, and nitrogen into gaseous products at residence times that were about ten times shorter than those achieved by stationary processing. The inorganic matrix present was virtually unchanged by the processing technique. It was concluded that this processing technique is feasible for use as part of a close-looped processing resource management system.

  8. Analysis article: accuracy of the DIDGET glucose meter in children and young adults with diabetes.

    PubMed

    Kim, Sarah

    2011-09-01

    Diabetes is one of the most common chronic diseases among American children. Although studies show that intensive management, including frequent glucose testing, improves diabetes control, this is difficult to accomplish. Bayer's DIDGET® glucose meter system pairs with a popular handheld video game system and couples good blood glucose testing habits with video-game-based rewards. In this issue, Deeb and colleagues performed a study demonstrating the accuracy of the DIDGET meter, a critical asset to this novel product designed to alleviate some of the challenges of managing pediatric diabetes. © 2011 Diabetes Technology Society.

  9. Electronic camera-management system for 35-mm and 70-mm film cameras

    NASA Astrophysics Data System (ADS)

    Nielsen, Allan

    1993-01-01

    Military and commercial test facilities have been tasked with the need for increasingly sophisticated data collection and data reduction. A state-of-the-art electronic control system for high speed 35 mm and 70 mm film cameras designed to meet these tasks is described. Data collection in today's test range environment is difficult at best. The need for a completely integrated image and data collection system is mandated by the increasingly complex test environment. Instrumentation film cameras have been used on test ranges to capture images for decades. Their high frame rates coupled with exceptionally high resolution make them an essential part of any test system. In addition to documenting test events, today's camera system is required to perform many additional tasks. Data reduction to establish TSPI (time- space-position information) may be performed after a mission and is subject to all of the variables present in documenting the mission. A typical scenario would consist of multiple cameras located on tracking mounts capturing the event along with azimuth and elevation position data. Corrected data can then be reduced using each camera's time and position deltas and calculating the TSPI of the object using triangulation. An electronic camera control system designed to meet these requirements has been developed by Photo-Sonics, Inc. The feedback received from test technicians at range facilities throughout the world led Photo-Sonics to design the features of this control system. These prominent new features include: a comprehensive safety management system, full local or remote operation, frame rate accuracy of less than 0.005 percent, and phase locking capability to Irig-B. In fact, Irig-B phase lock operation of multiple cameras can reduce the time-distance delta of a test object traveling at mach-1 to less than one inch during data reduction.

  10. Energy Management of An Extended Hybrid Renewable Energy System For Isolated Sites Using A Fuzzy Logic Controller

    NASA Astrophysics Data System (ADS)

    Faquir, Sanaa; Yahyaouy, Ali; Tairi, Hamid; Sabor, Jalal

    2018-05-01

    This paper presents the implementation of a fuzzy logic controller to manage the flow of energy in an extended hybrid renewable energy system employed to satisfy the load for a wide isolated site at the city of Essaouira in Morocco. To achieve Efficient energy management, the system is combining two important renewable energies: solar and wind. Lithium Ion batteries were also used as storage devices to store the excess of energy provided by the renewable sources or to supply the system with the required energy when the energy delivered by the input sources is not enough to satisfy the load demand. To manage the energy in the system, a controller based on fuzzy logic was implemented. Real data taken from previous research and meteorological sites was used to test the controller.

  11. Logistics Operations Management Center: Maintenance Support Baseline (LOMC-MSB)

    NASA Technical Reports Server (NTRS)

    Kurrus, R.; Stump, F.

    1995-01-01

    The Logistics Operations Management Center Maintenance Support Baseline is defined. A historical record of systems, applied to and deleted from, designs in support of future management and/or technical analysis is provided. All Flight elements, Ground Support Equipment, Facility Systems and Equipment and Test Support Equipment for which LOMC has responsibilities at Kennedy Space Center and other locations are listed. International Space Station Alpha Program documentation is supplemented. The responsibility of the Space Station Launch Site Support Office is established.

  12. 41 CFR 300-90.6 - What is authorized under the test programs?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... the test programs? 300-90.6 Section 300-90.6 Public Contracts and Property Management Federal Travel Regulation System GENERAL AGENCY REQUIREMENTS 90-TELEWORK TRAVEL EXPENSES TEST PROGRAMS § 300-90.6 What is authorized under the test programs? Under a telework expenses test program authorized by the Administrator of...

  13. Developing Internal Structure in Elementary School Students. A System of Classroom Management and Class Control.

    ERIC Educational Resources Information Center

    Hair, Helen; And Others

    A report is given of a three year project in which a system of classroom management designed to develop the ability of elementary school children to function at their maximum capacity in the classroom was implemented and tested. Great emphasis was placed on the use of motivational strategies, reinforcement techniques, involvement of students in…

  14. Certified records manager exam

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1990-01-01

    The Institute of Certified Records Managers (ICRM) is a non-profit, certifying organization of professional records managers and administrators. ICRM members are experienced in information requirements, records and information systems, and the related office systems and technologies. All members have met certification requirements and have received the Certified Records Manager (CRM) designation. As the field of information and records management moves toward standardization, and as the application of new technologies and technicalities complicate the measurement and demonstration of professional competence, the need for a means of identifying persons who have basic competency increases. The ICRM is providing such a means bymore » testing and certifying basic knowledge. More and more job announcements are requiring this evidence of competency. Unfortunately, as an organization, NIRMA has a relatively small number of CRMs. The goal of the ICRM Development Group is two-fold; (1) to encourage NIRMA members to obtain their certification by providing basic information and support and; (2) to develop the Nuclear Specialist test module which will demonstrate that bearers have demonstrated expertise in nuclear records management as well as basic competencies. This report covers the examination process.« less

  15. Toward Automation of Insulin Delivery - Management Solutions for Type 1 Diabetes.

    PubMed

    Nimri, Revital; Phillip, Moshe

    2016-01-01

    In the past decade, the field of type 1 diabetes was characterized by the efforts to integrate technology into the daily management of diabetes. Automated insulin delivery systems have emerged followed by the improvements in technology of pumps and sensors and automated close-loop systems that were developed around the world for overnight as well as for day and night use. Initially, these closed-loop systems were tested clinically in research centers, then at diabetes camps or hotels, and recently at patients' homes. The systems were tested in a wide range of populations of patients with type 1 diabetes: children, adolescents, adults, newly diagnosed, well and suboptimally controlled patients, the critically ill and pregnant women. The extensive clinical evaluation found these close-loop systems to be safe and efficient in controlling blood glucose levels. Now is the time to take these systems from research to industry and to get a regulatory approval of convenient devices for the use at home. Automated insulin delivery systems have the potential to change the way diabetes is treated and managed for the benefit of patients. This chapter summarizes the recent advances in this field. © 2016 S. Karger AG, Basel.

  16. Intelligent transportation systems field operational test cross-cutting study : hazardous material incident management

    DOT National Transportation Integrated Search

    1994-08-01

    This handbook was developed to assist design, traffic, and maintenance engineering personnel in making determinations about roadway delineation systems, including the appropriate system for a given situation, when a system has reached the end of its ...

  17. A project management system for the X-29A flight test program

    NASA Technical Reports Server (NTRS)

    Stewart, J. F.; Bauer, C. A.

    1983-01-01

    The project-management system developed for NASA's participation in the X-29A aircraft development program is characterized from a theoretical perspective, as an example of a system appropriate to advanced, highly integrated technology projects. System-control theory is applied to the analysis of classical project-management techniques and structures, which are found to be of closed-loop multivariable type; and the effects of increasing project complexity and integration are evaluated. The importance of information flow, sampling frequency, information holding, and delays is stressed. The X-29A system is developed in four stages: establishment of overall objectives and requirements, determination of information processes (block diagrams) definition of personnel functional roles and relationships, and development of a detailed work-breakdown structure. The resulting system is shown to require a greater information flow to management than conventional methods. Sample block diagrams are provided.

  18. Integrated Propulsion Data System Public Web Site

    NASA Technical Reports Server (NTRS)

    Hamilton, Kimberly

    2001-01-01

    The Integrated Propulsion Data System's (IPDS) focus is to provide technologically-advanced philosophies of doing business at SSC that will enhance the existing operations, engineering and management strategies and provide insight and metrics to assess their daily impacts, especially as related to the Propulsion Test Directorate testing scenarios for the 21st Century.

  19. 30 CFR 250.447 - When must I pressure test the BOP system?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations... pressure test your BOP system (this includes the choke manifold, kelly valves, inside BOP, and drill-string... performance warrant; and (c) Before drilling out each string of casing or a liner. The District Manager may...

  20. Development of a biowaste resistojet propulsion system

    NASA Technical Reports Server (NTRS)

    1973-01-01

    The equipment, exclusive of thrustors, required to demonstrate the feasibility of a resistojet propulsion system for space station attitude control application using representative simulated crew biowaste propellants and available resistojet thrustors in the ground simulation tests is discussed. The overall objective of the program was to provide a biowaste resistojet prototype propellant management and control system sufficiently similar to the flight article to permit concept feasibility and system demonstration testing of interface compatibility, operational characteristics, and system flexibility.

  1. Managing multicentre clinical trials with open source.

    PubMed

    Raptis, Dimitri Aristotle; Mettler, Tobias; Fischer, Michael Alexander; Patak, Michael; Lesurtel, Mickael; Eshmuminov, Dilmurodjon; de Rougemont, Olivier; Graf, Rolf; Clavien, Pierre-Alain; Breitenstein, Stefan

    2014-03-01

    Multicentre clinical trials are challenged by high administrative burden, data management pitfalls and costs. This leads to a reduced enthusiasm and commitment of the physicians involved and thus to a reluctance in conducting multicentre clinical trials. The purpose of this study was to develop a web-based open source platform to support a multi-centre clinical trial. We developed on Drupal, an open source software distributed under the terms of the General Public License, a web-based, multi-centre clinical trial management system with the design science research approach. This system was evaluated by user-testing and well supported several completed and on-going clinical trials and is available for free download. Open source clinical trial management systems are capable in supporting multi-centre clinical trials by enhancing efficiency, quality of data management and collaboration.

  2. Antiproton Studies in Penning Traps

    DTIC Science & Technology

    1993-09-30

    applications to MRI imaging. This is by far the most sensitive test of CPT invariance with a baryon system and is one of the most accurate tests of CPT...system which has likely applications to MRI imaging. This is by far the most sensitive test of CPT invariance with a baryon system and is one of the...a thin window of matter . In a second 24 hour demonstration experiment, we managed to capture a few antiprotons in the small volume of an ion trap.1

  3. Managing multiple-casualty incidents: a rural medical preparedness training assessment.

    PubMed

    Glow, Steven D; Colucci, Vincent J; Allington, Douglas R; Noonan, Curtis W; Hall, Earl C

    2013-08-01

    The objectives of this study were to develop a novel training model for using mass-casualty incident (MCI) scenarios that trained hospital and prehospital staff together using Microsoft Visio, images from Google Earth and icons representing first responders, equipment resources, local hospital emergency department bed capacity, and trauma victims. The authors also tested participants' knowledge in the areas of communications, incident command systems (ICS), and triage. Participants attended Managing Multiple-Casualty Incidents (MCIs), a one-day training which offered pre- and post-tests, two one-hour functional exercises, and four distinct, one-hour didactic instructional periods. Two MCI functional exercises were conducted. The one-hour trainings focused on communications, National Incident Management Systems/Incident Command Systems (NIMS/ICS) and professional roles and responsibilities in NIMS and triage. The trainings were offered throughout communities in western Montana. First response resource inventories and general manpower statistics for fire, police, Emergency Medical Services (EMS), and emergency department hospital bed capacity were determined prior to MCI scenario construction. A test was given prior to and after the training activities. A total of 175 firefighters, EMS, law enforcement, hospital personnel or other first-responders completed the pre- and post-test. Firefighters produced higher baseline scores than all other disciplines during pre-test analysis. At the end of the training all disciplines demonstrated significantly higher scores on the post-test when compared with their respective baseline averages. Improvements in post-test scores were noted for participants from all disciplines and in all didactic areas: communications, NIMS/ICS, and triage. Mass-casualty incidents offer significant challenges for prehospital and emergency room workers. Fire, Police and EMS personnel must secure the scene, establish communications, define individuals' roles and responsibilities, allocate resources, triage patients, and assign transport priorities. After emergency department notification and in advance of arrival, emergency department personnel must assess available physical resources and availability and type of manpower, all while managing patients already under their care. Mass-casualty incident trainings should strengthen the key, individual elements essential to well-coordinated response such as communications, incident management system and triage. The practice scenarios should be matched to the specific resources of the community. The authors also believe that these trainings should be provided with all disciplines represented to eliminate training "silos," to allow for discussion of overlapping jurisdictional or organizational responsibilities, and to facilitate team building.

  4. Demonstration of Passive Fuel Cell Thermal Management Technology

    NASA Technical Reports Server (NTRS)

    Burke, Kenneth A.; Jakupca, Ian; Colozza, Anthony; Wynne, Robert; Miller, Michael; Meyer, Al; Smith, William

    2012-01-01

    The NASA Glenn Research Center is developing advanced passive thermal management technology to reduce the mass and improve the reliability of space fuel cell systems for the NASA Exploration program. The passive thermal management system relies on heat conduction within highly thermally conductive cooling plates to move the heat from the central portion of the cell stack out to the edges of the fuel cell stack. Using the passive approach eliminates the need for a coolant pump and other cooling loop components within the fuel cell system which reduces mass and improves overall system reliability. Previous development demonstrated the performance of suitable highly thermally conductive cooling plates and integrated heat exchanger technology to collect the heat from the cooling plates (Ref. 1). The next step in the development of this passive thermal approach was the demonstration of the control of the heat removal process and the demonstration of the passive thermal control technology in actual fuel cell stacks. Tests were run with a simulated fuel cell stack passive thermal management system outfitted with passive cooling plates, an integrated heat exchanger and two types of cooling flow control valves. The tests were run to demonstrate the controllability of the passive thermal control approach. Finally, successful demonstrations of passive thermal control technology were conducted with fuel cell stacks from two fuel cell stack vendors.

  5. Test result communication in primary care: a survey of current practice

    PubMed Central

    Litchfield, Ian; Bentham, Louise; Lilford, Richard; McManus, Richard J; Hill, Ann; Greenfield, Sheila

    2015-01-01

    Background The number of blood tests ordered in primary care continues to increase and the timely and appropriate communication of results remains essential. However, the testing and result communication process includes a number of participants in a variety of settings and is both complicated to manage and vulnerable to human error. In the UK, guidelines for the process are absent and research in this area is surprisingly scarce; so before we can begin to address potential areas of weakness there is a need to more precisely understand the strengths and weaknesses of current systems used by general practices and testing facilities. Methods We conducted a telephone survey of practices across England to determine the methods of managing the testing and result communication process. In order to gain insight into the perspectives from staff at a large hospital laboratory we conducted paired interviews with senior managers, which we used to inform a service blueprint demonstrating the interaction between practices and laboratories and identifying potential sources of delay and failure. Results Staff at 80% of practices reported that the default method for communicating normal results required patients to telephone the practice and 40% of practices required that patients also call for abnormal results. Over 80% had no fail-safe system for ensuring that results had been returned to the practice from laboratories; practices would otherwise only be aware that results were missing or delayed when patients requested results. Persistent sources of missing results were identified by laboratory staff and included sample handling, misidentification of samples and the inefficient system for collating and resending misdirected results. Conclusions The success of the current system relies on patients both to retrieve results and in so doing alert staff to missing and delayed results. Practices appear slow to adopt available technological solutions despite their potential for reducing the impact of recurring errors in the handling of samples and the reporting of results. Our findings will inform our continuing work with patients and staff to develop, implement and evaluate improvements to existing systems of managing the testing and result communication process. PMID:26243888

  6. Orion Flight Test Preview Briefing

    NASA Image and Video Library

    2014-11-06

    In the Kennedy Space Center’s Press Site auditorium, members of the news media are briefed on the upcoming Orion flight test by Mark Geyer, NASA Orion Program manager. Also participating in the news conference are Bill Hill, NASA deputy associate administrator for Exploration Systems Development, left, and Bryan Austin, Lockheed Martin mission manager. Orion is the exploration spacecraft designed to carry astronauts to destinations not yet explored by humans, including an asteroid and Mars. It will have emergency abort capability, sustain the crew during space travel and provide safe re-entry from deep space return velocities. The first unpiloted flight test of Orion is scheduled to launch Dec. 4, 2014 atop a United Launch Alliance Delta IV Heavy rocket, and in 2018 on NASA’s Space Launch System rocket.

  7. SPI/U3.2. Security Profile Inspector for UNIX Systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bartoletti, A.

    1994-08-01

    SPI/U3.2 consists of five tools used to assess and report the security posture of computers running the UNIX operating system. The tools are: Access Control Test: A rule-based system which identifies sequential dependencies in UNIX access controls. Binary Authentication Tool: Evaluates the release status of system binaries by comparing a crypto-checksum to provide table entries. Change Detection Tool: Maintains and applies a snapshot of critical system files and attributes for purposes of change detection. Configuration Query Language: Accepts CQL-based scripts (provided) to evaluate queries over the status of system files, configuration of services and many other elements of UNIX systemmore » security. Password Security Inspector: Tests for weak or aged passwords. The tools are packaged with a forms-based user interface providing on-line context-sensistive help, job scheduling, parameter management and output report management utilities. Tools may be run independent of the UI.« less

  8. Performance monitor system functional simulator, environmental data, orbiter 101(HFT)

    NASA Technical Reports Server (NTRS)

    Parker, F. W.

    1974-01-01

    Information concerning the environment component of the space shuttle performance monitor system simulator (PMSS) and those subsystems operational on the shuttle orbiter 101 used for horizontal flight test (HFT) is provided, along with detailed data for the shuttle performance monitor system (PMS) whose software requirements evolve from three basic PMS functions: (1) fault detection and annunciation; (2) subsystem measurement management; and (3) subsystem configuration management. Information relative to the design and operation of Orbiter systems for HFT is also presented, and the functional paths are identified to the lowest level at which the crew can control the system functions. Measurement requirements are given which are necessary to adequately monitor the health status of the system. PMS process requirements, relative to the measurements which are necessary for fault detection and annunciation of a failed functional path, consist of measurement characteristics, tolerance limits, precondition tests, and correlation measurements.

  9. Report to the administrator by the NASA Aerospace Safety Advisory Panel on the Skylab program. Volume 1: Summary report. [systems management evaluation and design analysis

    NASA Technical Reports Server (NTRS)

    1973-01-01

    Contractor and NASA technical management for the development and manufacture of the Skylab modules is reviewed with emphasis on the following management controls: configuration and interface management; vendor control; and quality control of workmanship. A review of the modified two-stage Saturn V launch vehicle which focused on modifications to accommodate the Skylab payload; resolution of prior flight anomalies; and changes in personnel and management systems is presented along with an evaluation of the possible age-life and storage problems for the Saturn 1-B launch vehicle. The NASA program management's visibility and control of contractor operations, systems engineering and integration, the review process for the evaluation of design and flight hardware, and the planning process for mission operations are investigated. It is concluded that the technical management system for development and fabrication of the modules, spacecraft, and launch vehicles, the process of design and hardware acceptance reviews, and the risk assessment activities are satisfactory. It is indicated that checkout activity, integrated testing, and preparations for and execution of mission operation require management attention.

  10. Testing, Testing...Managing Electronic Access in Disparate Times.

    ERIC Educational Resources Information Center

    Carrington, Bessie M.

    1996-01-01

    Duke University's Perkins Library (North Carolina) tests electronic resources and services for remote accessibility by examining capabilities on various platforms, operating systems, communications software, and World Wide Web browsers. Problems occur in establishing connections, screen display, navigation or retrieval, keyboard variations, and in…

  11. DOD Financial Management: Improvement Needed in DOD Components’ Implementation of Audit Readiness Effort

    DTIC Science & Technology

    2011-09-01

    DOD Financial Management Abbreviations AFB Air Force Base COSO Committee of Sponsoring Organizations of the Treadway... Management and mismanagement.11 All of DOD’s programs on GAO’s High- Risk List relate to its business operations, including systems and processes... Management maintains audit readiness through risk -based periodic testing of internal controls utilizing the OMB Circular No. A-123, Appendix A

  12. Key Management Infrastructure Increment 2 (KMI Inc 2)

    DTIC Science & Technology

    2016-03-01

    2016 Major Automated Information System Annual Report Key Management Infrastructure Increment 2 (KMI Inc 2) Defense Acquisition Management...PB - President’s Budget RDT&E - Research, Development, Test, and Evaluation SAE - Service Acquisition Executive TBD - To Be Determined TY - Then...Assigned: April 6, 2015 Program Information Program Name Key Management Infrastructure Increment 2 (KMI Inc 2) DoD Component DoD The acquiring DoD

  13. Telemetry Standards, RCC Standard 106-17. Chapter 21. Telemetry Network Standard Introduction

    DTIC Science & Technology

    2017-07-01

    Critical RF radio frequency RFC Request for Comment SNMP Simple Network Management Protocol TA test article TCP Transmission Control Protocol...chapters might be of most interest for a particular reader. In order to guide the reader toward the chapters of further interest , the applicable... Simple Network Management Protocol (SNMP) to pass management information through the system. The SNMP management information bases (MIBs) provide

  14. Usability study of a computer-based self-management system for older adults with chronic diseases.

    PubMed

    Or, Calvin; Tao, Da

    2012-11-08

    Usability can influence patients' acceptance and adoption of a health information technology. However, little research has been conducted to study the usability of a self-management health care system, especially one geared toward elderly patients. This usability study evaluated a new computer-based self-management system interface for older adults with chronic diseases, using a paper prototype approach. Fifty older adults with different chronic diseases participated. Two usability evaluation methods were involved: (1) a heuristics evaluation and (2) end-user testing with a think-aloud testing method, audio recording, videotaping, and interviewing. A set of usability metrics was employed to determine the overall system usability, including task incompletion rate, task completion time, frequency of error, frequency of help, satisfaction, perceived usefulness, and perceived ease of use. Interviews were used to elicit participants' comments on the system design. The quantitative data were analyzed using descriptive statistics and the qualitative data were analyzed for content. The participants were able to perform the predesigned self-management tasks with the current system design and they expressed mostly positive responses about the perceived usability measures regarding the system interface. However, the heuristics evaluation, performance measures, and interviews revealed a number of usability problems related to system navigation, information search and interpretation, information presentation, and readability. Design recommendations for further system interface modifications were discussed. This study verified the usability of the self-management system developed for older adults with chronic diseases. Also, we demonstrated that our usability evaluation approach could be used to quickly and effectively identify usability problems in a health care information system at an early stage of the system development process using a paper prototype. Conducting a usability evaluation is an essential step in system development to ensure that the system features match the users' true needs, expectations, and characteristics, and also to minimize the likelihood of the users committing user errors and having difficulties using the system.

  15. Usability Study of a Computer-Based Self-Management System for Older Adults with Chronic Diseases

    PubMed Central

    Tao, Da

    2012-01-01

    Background Usability can influence patients’ acceptance and adoption of a health information technology. However, little research has been conducted to study the usability of a self-management health care system, especially one geared toward elderly patients. Objective This usability study evaluated a new computer-based self-management system interface for older adults with chronic diseases, using a paper prototype approach. Methods Fifty older adults with different chronic diseases participated. Two usability evaluation methods were involved: (1) a heuristics evaluation and (2) end-user testing with a think-aloud testing method, audio recording, videotaping, and interviewing. A set of usability metrics was employed to determine the overall system usability, including task incompletion rate, task completion time, frequency of error, frequency of help, satisfaction, perceived usefulness, and perceived ease of use. Interviews were used to elicit participants’ comments on the system design. The quantitative data were analyzed using descriptive statistics and the qualitative data were analyzed for content. Results The participants were able to perform the predesigned self-management tasks with the current system design and they expressed mostly positive responses about the perceived usability measures regarding the system interface. However, the heuristics evaluation, performance measures, and interviews revealed a number of usability problems related to system navigation, information search and interpretation, information presentation, and readability. Design recommendations for further system interface modifications were discussed. Conclusions This study verified the usability of the self-management system developed for older adults with chronic diseases. Also, we demonstrated that our usability evaluation approach could be used to quickly and effectively identify usability problems in a health care information system at an early stage of the system development process using a paper prototype. Conducting a usability evaluation is an essential step in system development to ensure that the system features match the users’ true needs, expectations, and characteristics, and also to minimize the likelihood of the users committing user errors and having difficulties using the system. PMID:23612015

  16. Sociohydrology of an Arid City: Development of a Coupled Model of Water Management in Las Vegas

    NASA Astrophysics Data System (ADS)

    Garcia, M. E.; Islam, S.; Portney, K. E.

    2014-12-01

    Rapidly growing cities in arid regions present a significant water management challenge. Key to tackling this challenge is understanding how and why some cities transition to more sustainable water management; acknowledging that urban water resources decisions are both responding to and precipitating hydrologic change, this question is best tackled through a sociohydrology approach. While coupling of natural and societal systems is in it's infancy in the field of hydrology, there is a strong tradition of studying coupled systems in the field of Socio-Ecological Systems. We build on Ostrom's Socio-Ecological Systems framework to develop a system dynamics model of water management for the Las Vegas metropolitan area using Vensim. A key objective our proposed modeling framework is to illuminate the dynamic interactions of the sociohydrologic system components and enable testing of various assumptions and strategies. The model of Las Vegas water management consists of five sub-modules: water supply, water demand, finances, public perception and policy making process. The development of the first three modules were based on clearly defined system structure. The public perception sub-module tracks the level public risk perception of a water supply shortage and represents the hypothesis that public risk perception is updated periodically when shortage events are experienced. The policy making process module uses an algorithm capturing the hypothesized decision making process to select policy actions (or in-action) from a set of feasible actions in response to the system states tracked by the model and observable to decision makers. The model was tested and parameterized using mix of quantitative data on water demands, supplies and costs and qualitative data from document analysis and interview data covering 1990 to 2010 period. Given that not only the parameters but also the structure of the public perception and the policy making process sub-systems is contested, a different approach must be taken to assess the robustness of these modules. Presented here is the development of the model, results of model testing against the historic reference modes using Las Vegas as an example, and future work planned to improve the robustness of the model.

  17. Orbital docking system centerline color television camera system test

    NASA Technical Reports Server (NTRS)

    Mongan, Philip T.

    1993-01-01

    A series of tests was run to verify that the design of the centerline color television camera (CTVC) system is adequate optically for the STS-71 Space Shuttle Orbiter docking mission with the Mir space station. In each test, a mockup of the Mir consisting of hatch, docking mechanism, and docking target was positioned above the Johnson Space Center's full fuselage trainer, which simulated the Orbiter with a mockup of the external airlock and docking adapter. Test subjects viewed the docking target through the CTVC under 30 different lighting conditions and evaluated target resolution, field of view, light levels, light placement, and methods of target alignment. Test results indicate that the proposed design will provide adequate visibility through the centerline camera for a successful docking, even with a reasonable number of light failures. It is recommended that the flight deck crew have individual switching capability for docking lights to provide maximum shadow management and that centerline lights be retained to deal with light failures and user preferences. Procedures for light management should be developed and target alignment aids should be selected during simulated docking runs.

  18. Monitoring and Testing the Parts Cleaning Stations, Abrasive Blasting Cabinets, and Paint Booths

    NASA Technical Reports Server (NTRS)

    Jordan, Tracee M.

    2004-01-01

    I have the opportunity to work in the Environmental Management Office (EMO) this summer. One of the EMO's tasks is to make sure the Environmental Management System is implemented to the entire Glenn Research Center (GRC). The Environmental Management System (EMS) is a policy or plan that is oriented toward minimizing an organization's impact to the environment. Our EMS includes the reduction of solid waste regeneration and the reduction of hazardous material use, waste, and pollution. With the Waste Management Team's (WMT) help, the EMS can be implemented throughout the NASA Glenn Research Center. The WMT is responsible for the disposal and managing of waste throughout the GRC. They are also responsible for the management of all chemical waste in the facility. My responsibility is to support the waste management team by performing an inventory on parts cleaning stations, abrasive cabinets, and paint booths through out the entire facility. These booths/stations are used throughout the center and they need to be monitored and tested for hazardous waste and material. My job is to visit each of these booths/stations, take samples of the waste, and analyze the samples.

  19. Rising Company’s Performance through Leadership Role: Culture, Strategies, and Management System as a Marine State

    NASA Astrophysics Data System (ADS)

    Wardi, Jeni; Yandra, Alexsander

    2018-05-01

    This research aims to learn the direct influence of transformational and transactional leaderships on Indonesian company’s performance through company’s culture, strategy, management accounting and control system as a marine state. This research involves descriptive and inferential designs in solving the research problem. To test the model and the hypothesis, SEM analysis is used. The populations of this research are companies registered in Indonesian stock exchange in 2012. The sampling technique uses purposive sampling. The data of the research are obtained from questionnaires distributed to respondents. The respondents are companies’ managers represented by accounting and finance managers with the positions 1 and 2 levels below top management team who have direct communication with the top management. The results of the research show that transformational leadership influences company’s performance directly, but not the transactional leadership. The company’s culture is not the mediation variable in indirect influence on the company’s performance, either in transformational or transactional leadership. On the other hand, management control system proves to be the mediation in transactional leadership on the performance but not for transformational leadership. Meanwhile, management accounting system proves to be the mediation variable in the influence of transformational and transactional leaderships. Except the variables of company’s culture, strategy, management accounting system and management control system, each directly influences the performance.

  20. Software OT&E Guidelines. Volume 1. Software Test Manager’s Handbook

    DTIC Science & Technology

    1981-02-01

    on reverse side If neceeary and identify by block number) The Software OT&E Guidelines is a set of handbooks prepared by the Computer / Support Systems...is one of a set of handbooks prepared by the Computer /Support Systems Division of the Test and Evaluation Directorate, Air Force Test and Evaluation...15 E. Software Maintainability .. .. ........ ... 16 F. Standard Questionnaires. .. .. ....... .... 16 1. Operator- Computer Interface Evaluation

  1. Systems Engineering Management Plan NASA Traffic Aware Planner Integration Into P-180 Airborne Test-Bed

    NASA Technical Reports Server (NTRS)

    Maris, John

    2015-01-01

    NASA's Traffic Aware Planner (TAP) is a cockpit decision support tool that provides aircrew with vertical and lateral flight-path optimizations with the intent of achieving significant fuel and time savings, while automatically avoiding traffic, weather, and restricted airspace conflicts. A key step towards the maturation and deployment of TAP concerned its operational evaluation in a representative flight environment. This Systems Engineering Management Plan (SEMP) addresses the test-vehicle design, systems integration, and flight-test planning for the first TAP operational flight evaluations, which were successfully completed in November 2013. The trial outcomes are documented in the Traffic Aware Planner (TAP) flight evaluation paper presented at the 14th AIAA Aviation Technology, Integration, and Operations Conference, Atlanta, GA. (AIAA-2014-2166, Maris, J. M., Haynes, M. A., Wing, D. J., Burke, K. A., Henderson, J., & Woods, S. E., 2014).

  2. International Space Station Environmental Control and Life Support System Acceptance Testing for Node 1 Temperature and Humidity Control Subsystem

    NASA Technical Reports Server (NTRS)

    Williams, David E.

    2011-01-01

    The International Space Station (ISS) Node 1 Environmental Control and Life Support (ECLS) System is comprised of five subsystems: Atmosphere Control and Storage (ACS), Atmosphere Revitalization (AR), Fire Detection and Suppression (FDS), Temperature and Humidity Control (THC), and Water Recovery and Management (WRM). This paper will provide a summary of the Node 1 ECLS THC subsystem design and a detailed discussion of the ISS ECLS Acceptance Testing methodology utilized for this subsystem.The International Space Station (ISS) Node 1 Environmental Control and Life Support (ECLS) System is comprised of five subsystems: Atmosphere Control and Storage (ACS), Atmosphere Revitalization (AR), Fire Detection and Suppression (FDS), Temperature and Humidity Control (THC), and Water Recovery and Management (WRM). This paper will provide a summary of the Node 1 ECLS THC subsystem design and a detailed discussion of the ISS ECLS Acceptance Testing methodology utilized for this subsystem.

  3. ERTS-1 Role in land management and planning in Minnesota

    NASA Technical Reports Server (NTRS)

    Sizer, J. E.; Brown, D. A.

    1974-01-01

    Research on applications of ERTS-1 imagery to land use has focused on evaluating the ability of ERTS-1 imagery to update and refine the detail of land use information in the Minnesota Land Management Information System. Work has been directed toward defining the capabilities of the ERTS-1 system to provide information about surface cover by identifying forest, water, and wetland resources; urban and agricultural development: and testing and evaluating data input and output procedures. As capabilities were developed, meetings were held with administrators and resource information users from various agencies of government to identify their information needs. A full scale systems test for several selected pilot areas in the state is nearly complete. Users have been identified for each test area and they have been instrumental in identifying data requirements and analysis needs for administrative purposes. Users have both rural and urban orientations and provide a basis for evaluation of the results.

  4. KSC-2009-5954

    NASA Image and Video Library

    2009-10-28

    CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, a post-launch news conference is held in the Press Site auditorium following the successful launch of the Ares I-X test rocket at 11:30 a.m. EDT Oct. 28. Smiling, from left, are Doug Cooke, associate administrator for NASA's Exploration Systems Mission Directorate; Jeff Hanley, Constellation Program manager; Bob Ess, mission manager for the Ares I-X flight test; and Edward Mango, launch director for the Ares I-X flight test. For more information on the Ares I-X vehicle and flight test, visit http://www.nasa.gov/aresIX. Photo credit: NASA/Kim Shiflett

  5. KSC-2009-5955

    NASA Image and Video Library

    2009-10-28

    CAPE CANAVERAL, Fla. - At NASA's Kennedy Space Center in Florida, Constellation Program Manager Jeff Hanley addresses a post-launch news conference in the Press Site auditorium following the successful launch of the Ares I-X test rocket at 11:30 a.m. EDT Oct. 28. From left, are, Doug Cooke, associate administrator for NASA's Exploration Systems Mission Directorate; Hanley; Bob Ess, mission manager for the Ares I-X flight test; and Edward Mango, launch director for the Ares I-X flight test. For more information on the Ares I-X vehicle and flight test, visit http://www.nasa.gov/aresIX. Photo credit: NASA/Kim Shiflett

  6. Distributed data analysis in ATLAS

    NASA Astrophysics Data System (ADS)

    Nilsson, Paul; Atlas Collaboration

    2012-12-01

    Data analysis using grid resources is one of the fundamental challenges to be addressed before the start of LHC data taking. The ATLAS detector will produce petabytes of data per year, and roughly one thousand users will need to run physics analyses on this data. Appropriate user interfaces and helper applications have been made available to ensure that the grid resources can be used without requiring expertise in grid technology. These tools enlarge the number of grid users from a few production administrators to potentially all participating physicists. ATLAS makes use of three grid infrastructures for the distributed analysis: the EGEE sites, the Open Science Grid, and Nordu Grid. These grids are managed by the gLite workload management system, the PanDA workload management system, and ARC middleware; many sites can be accessed via both the gLite WMS and PanDA. Users can choose between two front-end tools to access the distributed resources. Ganga is a tool co-developed with LHCb to provide a common interface to the multitude of execution backends (local, batch, and grid). The PanDA workload management system provides a set of utilities called PanDA Client; with these tools users can easily submit Athena analysis jobs to the PanDA-managed resources. Distributed data is managed by Don Quixote 2, a system developed by ATLAS; DQ2 is used to replicate datasets according to the data distribution policies and maintains a central catalog of file locations. The operation of the grid resources is continually monitored by the Ganga Robot functional testing system, and infrequent site stress tests are performed using the Hammer Cloud system. In addition, the DAST shift team is a group of power users who take shifts to provide distributed analysis user support; this team has effectively relieved the burden of support from the developers.

  7. Iterative Design and Usability Testing of the Imhere System for Managing Chronic Conditions and Disability

    PubMed Central

    FAIRMAN, ANDREA D.; YIH, ERIKA T.; MCCOY, DANIEL F.; LOPRESTI, EDMUND F.; MCCUE, MICHAEL P.; PARMANTO, BAMBANG; DICIANNO, BRAD E.

    2016-01-01

    A novel mobile health platform, Interactive Mobile Health and Rehabilitation (iMHere), is being developed to support wellness and self-management among people with chronic disabilities. The iMHere system currently includes a smartphone app with six modules for use by persons with disabilities and a web portal for use by medical and rehabilitation professionals or other support personnel. Our initial clinical research applying use of this system provides insight into the feasibility of employing iMHere in the development of self-management skills in young adults (ages 18–40 years) with spina bifida (SB) (Dicianno, Fairman, et al., 2015). This article describes the iterative design of the iMHere system including usability testing of both the app modules and clinician portal. Our pilot population of persons with SB fostered the creation of a system appropriate for people with a wide variety of functional abilities and needs. As a result, the system is appropriate for use by persons with various disabilities and chronic conditions, not only SB. In addition, the diversity of professionals and support personnel involved in the care of persons with SB also enabled the design and implementation of the iMHere system to meet the needs of an interdisciplinary team of providers who treat various conditions. The iMHere system has the potential to foster communication and collaboration among members of an interdisciplinary healthcare team, including individuals with chronic conditions and disabilities, for a client-centered approach to support self-management skills. PMID:27563387

  8. Patient data management systems in intensive care--the situation in Europe.

    PubMed

    Metnitz, P G; Lenz, K

    1995-09-01

    Computerized Patient Data Management Systems (PDMS) have been developed for handling the enormous increase in data collection in ICUs. This study tries to evaluate the functionality of such systems installed in Europe. Criteria reflecting usefulness and practicality formed the basis of a questionnaire to be answered accurately by the vendors. We then examined functions provided and their implementation in European ICUs. Next, an "Information Delivery Test" evaluated variations in performance, taking questions arising from daily routine work and measured time of information delivery. ICUs located in Vienna (Austria), Antwerp (Belgium), Dortmund (Germany), Kuopio (Finland). 5 PDMS were selected on the basis of our inclusion criteria: commercial availability with at least one installation in Europe, bedside-based design, realization of international standards and a prescribed minimum of functionality. The "Table of Functions" shows an overview of functions and their implementation. "System analyses" indicates predominant differences in properties and functions found between the systems. Results of the "Information Delivery Tests" are shown in the graphic charts. Systems with graphical data presentation have advantages over systems presenting data mainly in numerical format. Time has come to form a medical establishment powerful enough to set standards and thus communicate with industrial partners as well as with hospital management responsible for planning, purchasing and implementing PDMS. Overall, communication between clinicians, nurses, computer scientists and PDMS vendors must be enhanced to achieve the common goal: useful and practical data management systems at ICUs.

  9. Coordinated management of combined sewer overflows by means of environmental decision support systems.

    PubMed

    Murla, Damian; Gutierrez, Oriol; Martinez, Montse; Suñer, David; Malgrat, Pere; Poch, Manel

    2016-04-15

    During heavy rainfall, the capacity of sewer systems and wastewater treatment plants may be surcharged producing uncontrolled wastewater discharges and a depletion of the environmental quality. Therefore there is a need of advanced management tools to tackle with these complex problems. In this paper an environmental decision support system (EDSS), based on the integration of mathematical modeling and knowledge-based systems, has been developed for the coordinated management of urban wastewater systems (UWS) to control and minimize uncontrolled wastewater spills. Effectiveness of the EDSS has been tested in a specially designed virtual UWS, including two sewers systems, two WWTP and one river subjected to typical Mediterranean rain conditions. Results show that sewer systems, retention tanks and wastewater treatment plants improve their performance under wet weather conditions and that EDSS can be very effective tools to improve the management and prevent the system from possible uncontrolled wastewater discharges. Copyright © 2016 Elsevier B.V. All rights reserved.

  10. Engineering development program of a closed aluminum-oxygen semi-cell system for an unmanned underwater vehicle: An update

    NASA Astrophysics Data System (ADS)

    Gregg, Dane W.; Hall, Susan E.

    1995-04-01

    Most emerging unmanned undersea vehicle (UUV) missions require significantly longer range and endurance than is achievable with existing battery technology. The Aluminum-Oxygen (Al-O2) semi-cell is a candidate technology capable of providing a significant improvement in endurance compared to the silver-zinc battery technology currently used in UUVs and compares favorably to other proposed UUV power systems not only in performance, but also in safety and logistics. An Al-O2 semi-cell system is under development by Loral Defense Systems-Akron (Loral) for the ARPA/Navy 44 in. diameter UUV test vehicle. The power plant consists of a cell stack, gas management, oxygen storage, electrolyte management, coolant and controller subsystems, designed to replace the existing silver-zinc battery and meet existing weight, volume, electrical and thermal requirements, therefore minimizing modifications to the UUV. A detailed system design is complete. A component and material endurance test to evaluate compatibility and reliability of various material arid components is complete. Sub scale (Short stack) system testing is completed. A full-scale demonstration unit is now under construction in the second half of 1995. The full scale demonstration test will simulate environmental conditions of the operational system. This paper summarizes the results of the extensive short stack and endurance test programs, describes the plan for full-scale testing, and concludes with a brief discussions of future directions for this technology. This program is sponsored by ARPA Maritime Systems Technology Office under NASA contract NAS3-26715.

  11. Introduction to an Open Source Internet-Based Testing Program for Medical Student Examinations

    PubMed Central

    2009-01-01

    The author developed a freely available open source internet-based testing program for medical examination. PHP and Java script were used as the programming language and postgreSQL as the database management system on an Apache web server and Linux operating system. The system approach was that a super user inputs the items, each school administrator inputs the examinees' information, and examinees access the system. The examinee's score is displayed immediately after examination with item analysis. The set-up of the system beginning with installation is described. This may help medical professors to easily adopt an internet-based testing system for medical education. PMID:20046457

  12. Introduction to an open source internet-based testing program for medical student examinations.

    PubMed

    Lee, Yoon-Hwan

    2009-12-20

    The author developed a freely available open source internet-based testing program for medical examination. PHP and Java script were used as the programming language and postgreSQL as the database management system on an Apache web server and Linux operating system. The system approach was that a super user inputs the items, each school administrator inputs the examinees' information, and examinees access the system. The examinee's score is displayed immediately after examination with item analysis. The set-up of the system beginning with installation is described. This may help medical professors to easily adopt an internet-based testing system for medical education.

  13. Projection of Big Cities Waste Management and Cost Based on Economic and Demographic Factors in Indonesia

    NASA Astrophysics Data System (ADS)

    Prajati, Gita; Padmi, Tri; Benno Rahardyan, dan

    2017-12-01

    Nowadays, solid waste management continues to be a major challenge in urban areas, especially in developing country. It is triggered by population growth, economic growth, industrialization and urbanization. Indonesia itselfs categorized into developing country. Indonesia's government has many program in order to increase the economic growth. One of them is MP3EI (Masterplan Percepatan dan Perluasan Pembangunan Ekonomi Indonesia. This program should be suppported by right waste management system. If Indonesia's waste management system can't afford the economic growth, it will trigger health and environmental problems. This study's purpose is to develop the socio-economic-environment model that can be used as a basis planning for the facility and cost of waste management systems. In this paper we used the development of Khajuria model test method. This method used six variables, which are GDP, population, population density, illiteracy, school's period and economic growth. The result showed that development of Khajuria test could explained the influence of economic and demographic factors to waste generation, 65.6%. The projection of waste generation shows that Pangkalpinang, Pekanbaru and Serang are the cities with the highest waste generation for the next five years. The number of dump truck and TPS in DKI Jakarata is the highest within another city, which is 39.37%. For the next five years, the waste management system in our study areas cost maximum 0.8% from GDP (Gross Domestic Products).

  14. Lynch syndrome: barriers to and facilitators of screening and disease management.

    PubMed

    Watkins, Kathy E; Way, Christine Y; Fiander, Jacqueline J; Meadus, Robert J; Esplen, Mary Jane; Green, Jane S; Ludlow, Valerie C; Etchegary, Holly A; Parfrey, Patrick S

    2011-09-07

    Lynch syndrome is a hereditary cancer with confirmed carriers at high risk for colorectal (CRC) and extracolonic cancers. The purpose of the current study was to develop a greater understanding of the factors influencing decisions about disease management post-genetic testing. The study used a grounded theory approach to data collection and analysis as part of a multiphase project examining the psychosocial and behavioral impact of predictive DNA testing for Lynch syndrome. Individual and small group interviews were conducted with individuals from 10 families with the MSH2 intron 5 splice site mutation or exon 8 deletion. The data from confirmed carriers (n = 23) were subjected to re-analysis to identify key barriers to and/or facilitators of screening and disease management. Thematic analysis identified personal, health care provider and health care system factors as dominant barriers to and/or facilitators of managing Lynch syndrome. Person-centered factors reflect risk perceptions and decision-making, and enduring screening/disease management. The perceived knowledge and clinical management skills of health care providers also influenced participation in recommended protocols. The health care system barriers/facilitators are defined in terms of continuity of care and coordination of services among providers. Individuals with Lynch syndrome often encounter multiple barriers to and facilitators of disease management that go beyond the individual to the provider and health care system levels. The current organization and implementation of health care services are inadequate. A coordinated system of local services capable of providing integrated, efficient health care and follow-up, populated by providers with knowledge of hereditary cancer, is necessary to maintain optimal health.

  15. Effective Materials Property Information Management for the 21st Century

    NASA Technical Reports Server (NTRS)

    Ren, Weiju; Cebon, David; Arnold, Steve

    2009-01-01

    This paper discusses key principles for the development of materials property information management software systems. There are growing needs for automated materials information management in various organizations. In part these are fueled by the demands for higher efficiency in material testing, product design and engineering analysis. But equally important, organizations are being driven by the need for consistency, quality and traceability of data, as well as control of access to sensitive information such as proprietary data. Further, the use of increasingly sophisticated nonlinear, anisotropic and multi-scale engineering analyses requires both processing of large volumes of test data for development of constitutive models and complex materials data input for Computer-Aided Engineering (CAE) software. And finally, the globalization of economy often generates great needs for sharing a single "gold source" of materials information between members of global engineering teams in extended supply chains. Fortunately, material property management systems have kept pace with the growing user demands and evolved to versatile data management systems that can be customized to specific user needs. The more sophisticated of these provide facilities for: (i) data management functions such as access, version, and quality controls; (ii) a wide range of data import, export and analysis capabilities; (iii) data "pedigree" traceability mechanisms; (iv) data searching, reporting and viewing tools; and (v) access to the information via a wide range of interfaces. In this paper the important requirements for advanced material data management systems, future challenges and opportunities such as automated error checking, data quality characterization, identification of gaps in datasets, as well as functionalities and business models to fuel database growth and maintenance are discussed.

  16. Developing Sustainable Spacecraft Water Management Systems

    NASA Technical Reports Server (NTRS)

    Thomas, Evan A.; Klaus, David M.

    2009-01-01

    It is well recognized that water handling systems used in a spacecraft are prone to failure caused by biofouling and mineral scaling, which can clog mechanical systems and degrade the performance of capillary-based technologies. Long duration spaceflight applications, such as extended stays at a Lunar Outpost or during a Mars transit mission, will increasingly benefit from hardware that is generally more robust and operationally sustainable overtime. This paper presents potential design and testing considerations for improving the reliability of water handling technologies for exploration spacecraft. Our application of interest is to devise a spacecraft wastewater management system wherein fouling can be accommodated by design attributes of the management hardware, rather than implementing some means of preventing its occurrence.

  17. GNSS-based emergency management system

    NASA Astrophysics Data System (ADS)

    Wu, Yuhang; Chen, Xiuwan; Ma, Lei

    2009-06-01

    Public safety and public service is a particularly challenging task. The questions of how to use the limited resources efficiently, how to improve the Government's emergency rapid response and ability of risk resistance, and how to provide a more efficient emergency service for the public, have increasingly become the focus to strengthen urban management. Emergency Response Management System is a highly efficient and powerful command system dealing with natural and social disasters, by using all aspects of the force being gathered in a short period of time, sudden events can be handled efficiently, and further development of the incident can be controlled. In this paper, based on the analysis of development status of the emergency management system at home and abroad, and the key technologies of the emergency management system based on GNSS, research and development on emergency command system based on GNSS has been done. Meanwhile, test in Sichuan earthquake has also been carried out. Practice in Sichuan province earthquake relief work has proved that the emergency management command system based on GNSS can play the advantage function and exert the maximum potential, and can play the role of "lifeline" in the critical moment.

  18. Salary Management System for Small and Medium-sized Enterprises

    NASA Astrophysics Data System (ADS)

    Hao, Zhang; Guangli, Xu; Yuhuan, Zhang; Yilong, Lei

    Small and Medium-sized Enterprises (SMEs) in the process of wage entry, calculation, the total number are needed to be done manually in the past, the data volume is quite large, processing speed is low, and it is easy to make error, which is resulting in low efficiency. The main purpose of writing this paper is to present the basis of salary management system, establish a scientific database, the computer payroll system, using the computer instead of a lot of past manual work in order to reduce duplication of staff labor, it will improve working efficiency.This system combines the actual needs of SMEs, through in-depth study and practice of the C/S mode, PowerBuilder10.0 development tools, databases and SQL language, Completed a payroll system needs analysis, database design, application design and development work. Wages, departments, units and personnel database file are included in this system, and have data management, department management, personnel management and other functions, through the control and management of the database query, add, delete, modify, and other functions can be realized. This system is reasonable design, a more complete function, stable operation has been tested to meet the basic needs of the work.

  19. 78 FR 58449 - Generator Requirements at the Transmission Interface

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-24

    ... Connection Requirements), FAC-003-3 (Transmission Vegetation Management), PRC-004- 2.1a (Analysis and... and Generation Protection System Maintenance and Testing). The modifications improve reliability... Standards FAC-001-1 (Facility Connection Requirements), FAC-003-3 (Transmission Vegetation Management), PRC...

  20. DoD Financial Management: Important Steps Underway But Reform Will Require a Long-term Commitment

    DTIC Science & Technology

    2002-06-04

    consolidated financial statements . To date, none of the military services or major DOD components has passed the test of an independent financial audit because of weaknesses in financial management systems, operations, and controls.

  1. Kwf-Grid workflow management system for Earth science applications

    NASA Astrophysics Data System (ADS)

    Tran, V.; Hluchy, L.

    2009-04-01

    In this paper, we present workflow management tool for Earth science applications in EGEE. The workflow management tool was originally developed within K-wf Grid project for GT4 middleware and has many advanced features like semi-automatic workflow composition, user-friendly GUI for managing workflows, knowledge management. In EGEE, we are porting the workflow management tool to gLite middleware for Earth science applications K-wf Grid workflow management system was developed within "Knowledge-based Workflow System for Grid Applications" under the 6th Framework Programme. The workflow mangement system intended to - semi-automatically compose a workflow of Grid services, - execute the composed workflow application in a Grid computing environment, - monitor the performance of the Grid infrastructure and the Grid applications, - analyze the resulting monitoring information, - capture the knowledge that is contained in the information by means of intelligent agents, - and finally to reuse the joined knowledge gathered from all participating users in a collaborative way in order to efficiently construct workflows for new Grid applications. Kwf Grid workflow engines can support different types of jobs (e.g. GRAM job, web services) in a workflow. New class of gLite job has been added to the system, allows system to manage and execute gLite jobs in EGEE infrastructure. The GUI has been adapted to the requirements of EGEE users, new credential management servlet is added to portal. Porting K-wf Grid workflow management system to gLite would allow EGEE users to use the system and benefit from its avanced features. The system is primarly tested and evaluated with applications from ES clusters.

  2. A Distributed Dynamic Programming-Based Solution for Load Management in Smart Grids

    NASA Astrophysics Data System (ADS)

    Zhang, Wei; Xu, Yinliang; Li, Sisi; Zhou, MengChu; Liu, Wenxin; Xu, Ying

    2018-03-01

    Load management is being recognized as an important option for active user participation in the energy market. Traditional load management methods usually require a centralized powerful control center and a two-way communication network between the system operators and energy end-users. The increasing user participation in smart grids may limit their applications. In this paper, a distributed solution for load management in emerging smart grids is proposed. The load management problem is formulated as a constrained optimization problem aiming at maximizing the overall utility of users while meeting the requirement for load reduction requested by the system operator, and is solved by using a distributed dynamic programming algorithm. The algorithm is implemented via a distributed framework and thus can deliver a highly desired distributed solution. It avoids the required use of a centralized coordinator or control center, and can achieve satisfactory outcomes for load management. Simulation results with various test systems demonstrate its effectiveness.

  3. Feasibility of using the Omaha System to represent public health nurse manager interventions.

    PubMed

    Monsen, Karen A; Newsom, Eric T

    2011-01-01

    To test the feasibility of representing public health nurse (PHN) manager interventions using a recognized standardized nursing terminology. A nurse manager in a Midwest local public health agency documented nurse manager interventions using the Omaha System for 5 months. ANALYTIC STRATEGY: The data were analyzed and the results were compared with the results from a parallel analysis of existing PHN intervention data. Interventions for 79 "clients" (projects, teams, or individuals) captured 76% of recorded work hours, and addressed 43% of Omaha System problems. Most problems were addressed at the "community" level (87.1%) versus the "individual" level (12.9%). Nursing practice differed between the 2 knowledge domains of public health family home visiting nursing and public health nursing management. Standardized nursing terminologies have the potential to represent, describe, and quantify nurse manager interventions for future evaluation and research. © 2011 Wiley Periodicals, Inc.

  4. Foundational Report Series: Advanced Distribution Management Systems for Grid Modernization, Implementation Strategy for a Distribution Management System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Singh, Ravindra; Reilly, James T.; Wang, Jianhui

    Electric distribution utilities encounter many challenges to successful deployment of Distribution Management Systems (DMSs). The key challenges are documented in this report, along with suggestions for overcoming them. This report offers a recommended list of activities for implementing a DMS. It takes a strategic approach to implementing DMS from a project management perspective. The project management strategy covers DMS planning, procurement, design, building, testing, Installation, commissioning, and system integration issues and solutions. It identifies the risks that are associated with implementation and suggests strategies for utilities to use to mitigate them or avoid them altogether. Attention is given to commonmore » barriers to successful DMS implementation. This report begins with an overview of the implementation strategy for a DMS and proceeds to put forward a basic approach for procuring hardware and software for a DMS; designing the interfaces with external corporate computing systems such as EMS, GIS, OMS, and AMI; and implementing a complete solution.« less

  5. NASA Stennis Space Center Integrated System Health Management Test Bed and Development Capabilities

    NASA Technical Reports Server (NTRS)

    Figueroa, Fernando; Holland, Randy; Coote, David

    2006-01-01

    Integrated System Health Management (ISHM) is a capability that focuses on determining the condition (health) of every element in a complex System (detect anomalies, diagnose causes, prognosis of future anomalies), and provide data, information, and knowledge (DIaK)-not just data-to control systems for safe and effective operation. This capability is currently done by large teams of people, primarily from ground, but needs to be embedded on-board systems to a higher degree to enable NASA's new Exploration Mission (long term travel and stay in space), while increasing safety and decreasing life cycle costs of spacecraft (vehicles; platforms; bases or outposts; and ground test, launch, and processing operations). The topics related to this capability include: 1) ISHM Related News Articles; 2) ISHM Vision For Exploration; 3) Layers Representing How ISHM is Currently Performed; 4) ISHM Testbeds & Prototypes at NASA SSC; 5) ISHM Functional Capability Level (FCL); 6) ISHM Functional Capability Level (FCL) and Technology Readiness Level (TRL); 7) Core Elements: Capabilities Needed; 8) Core Elements; 9) Open Systems Architecture for Condition-Based Maintenance (OSA-CBM); 10) Core Elements: Architecture, taxonomy, and ontology (ATO) for DIaK management; 11) Core Elements: ATO for DIaK Management; 12) ISHM Architecture Physical Implementation; 13) Core Elements: Standards; 14) Systematic Implementation; 15) Sketch of Work Phasing; 16) Interrelationship Between Traditional Avionics Systems, Time Critical ISHM and Advanced ISHM; 17) Testbeds and On-Board ISHM; 18) Testbed Requirements: RETS AND ISS; 19) Sustainable Development and Validation Process; 20) Development of on-board ISHM; 21) Taxonomy/Ontology of Object Oriented Implementation; 22) ISHM Capability on the E1 Test Stand Hydraulic System; 23) Define Relationships to Embed Intelligence; 24) Intelligent Elements Physical and Virtual; 25) ISHM Testbeds and Prototypes at SSC Current Implementations; 26) Trailer-Mounted RETS; 27) Modeling and Simulation; 28) Summary ISHM Testbed Environments; 29) Data Mining - ARC; 30) Transitioning ISHM to Support NASA Missions; 31) Feature Detection Routines; 32) Sample Features Detected in SSC Test Stand Data; and 33) Health Assessment Database (DIaK Repository).

  6. The Mice in Council: An Acquisition Fable

    DTIC Science & Technology

    2012-02-01

    ground defensive systems to air defensive systems.” Everyone cheered because the mouse industrial base could now compete favorably with the cows ... dairy industry and the chickens’ egg industry. The program manager directed that full-rate production begin. The mouse factories churned out bells...to the cows . Moral Contracting, logistics, engineering, budgeting, testing, finan- cial and program management cannot make a product work. Unless you

  7. A Probabilistic Ontology Development Methodology

    DTIC Science & Technology

    2014-06-01

    Test, and Evaluation; Acquisition; and Planning and Marketing ," in Handbook of Systems Engineering and Management .: John Wiley & Sons, 2009, pp...Intelligence and knowledge management . However, many real world problems in these disciplines are burdened by incomplete information and other sources...knowledge engineering, Artificial Intelligence and knowledge management . However, many real world problems in these disciplines are burdened by

  8. Factoring quality laboratory diagnosis into the malaria control agenda for sub-Saharan Africa.

    PubMed

    Aidoo, Michael

    2013-09-01

    Recent progress in malaria control in sub-Saharan Africa has been achieved primarily through provision of insecticide-treated nets, indoor residual spraying, and antimalarial drugs. Although these interventions are important, proper case identification and accurate measurement of their impact depend on quality diagnostic testing. Current availability of diagnostic testing for malaria in sub-Saharan Africa is inadequate to support disease management, prevention programs, and surveillance needs. Challenges faced include a dearth of skilled workforce, inadequate health systems infrastructure, and lack of political will. A coordinated approach to providing pre-service clinical and laboratory training together with systems that support a scale-up of laboratory services could provide means not only for effective malaria case management but also, management of non-malaria febrile illnesses, disease surveillance, and accurate control program evaluation. A synthesis of the challenges faced in ensuring quality malaria testing and how to include this information in the malaria control and elimination agenda are presented.

  9. A data base and analysis program for shuttle main engine dynamic pressure measurements

    NASA Technical Reports Server (NTRS)

    Coffin, T.

    1986-01-01

    A dynamic pressure data base management system is described for measurements obtained from space shuttle main engine (SSME) hot firing tests. The data were provided in terms of engine power level and rms pressure time histories, and power spectra of the dynamic pressure measurements at selected times during each test. Test measurements and engine locations are defined along with a discussion of data acquisition and reduction procedures. A description of the data base management analysis system is provided and subroutines developed for obtaining selected measurement means, variances, ranges and other statistics of interest are discussed. A summary of pressure spectra obtained at SSME rated power level is provided for reference. Application of the singular value decomposition technique to spectrum interpolation is discussed and isoplots of interpolated spectra are presented to indicate measurement trends with engine power level. Program listings of the data base management and spectrum interpolation software are given. Appendices are included to document all data base measurements.

  10. Responsive Multimodal Transportation Management Strategies And IVHS

    DOT National Transportation Integrated Search

    1998-09-01

    Emergency Notification and Response report summarizes and interprets the results of two Field Operational Tests (FOTs) that included emergency notification and response system components. The tests included in this report are: Colorado Mayday and Pug...

  11. Underground coal mine instrumentation and test

    NASA Technical Reports Server (NTRS)

    Burchill, R. F.; Waldron, W. D.

    1976-01-01

    The need to evaluate mechanical performance of mine tools and to obtain test performance data from candidate systems dictate that an engineering data recording system be built. Because of the wide range of test parameters which would be evaluated, a general purpose data gathering system was designed and assembled to permit maximum versatility. A primary objective of this program was to provide a specific operating evaluation of a longwall mining machine vibration response under normal operating conditions. A number of mines were visited and a candidate for test evaluation was selected, based upon management cooperation, machine suitability, and mine conditions. Actual mine testing took place in a West Virginia mine.

  12. The patients' perspective of international normalized ratio self-testing, remote communication of test results and confidence to move to self-management.

    PubMed

    Grogan, Anne; Coughlan, Michael; Prizeman, Geraldine; O'Connell, Niamh; O'Mahony, Nora; Quinn, Katherine; McKee, Gabrielle

    2017-12-01

    To elicit the perceptions of patients, who self-tested their international normalized ratio and communicated their results via a text or phone messaging system, to determine their satisfaction with the education and support that they received and to establish their confidence to move to self-management. Self-testing of international normalized ratio has been shown to be reliable and is fast becoming common practice. As innovations are introduced to point of care testing, more research is needed to elicit patients' perceptions of the self-testing process. This three site study used a cross-sectional prospective descriptive survey. Three hundred and thirty patients who were prescribed warfarin and using international normalized ratio self-testing were invited to take part in the study. The anonymous survey examined patient profile, patients' usage, issues, perceptions, confidence and satisfaction with using the self-testing system and their preparedness for self-management of warfarin dosage. The response rate was 57% (n = 178). Patients' confidence in self-testing was high (90%). Patients expressed a high level of satisfaction with the support received, but expressed the need for more information on support groups, side effects of warfarin, dietary information and how to dispose of needles. When asked if they felt confident to adjust their own warfarin levels 73% agreed. Chi-squared tests for independence revealed that none of the patient profile factors examined influenced this confidence. The patients cited the greatest advantages of the service were reduced burden, more autonomy, convenience and ease of use. The main disadvantages cited were cost and communication issues. Patients were satisfied with self-testing. The majority felt they were ready to move to self-management. The introduction of innovations to remote point of care testing, such as warfarin self-testing, needs to have support at least equal to that provided in a hospital setting. © 2017 John Wiley & Sons Ltd.

  13. Adaptive management for soil ecosystem services.

    PubMed

    Birgé, Hannah E; Bevans, Rebecca A; Allen, Craig R; Angeler, David G; Baer, Sara G; Wall, Diana H

    2016-12-01

    Ecosystem services provided by soil include regulation of the atmosphere and climate, primary (including agricultural) production, waste processing, decomposition, nutrient conservation, water purification, erosion control, medical resources, pest control, and disease mitigation. The simultaneous production of these multiple services arises from complex interactions among diverse aboveground and belowground communities across multiple scales. When a system is mismanaged, non-linear and persistent losses in ecosystem services can arise. Adaptive management is an approach to management designed to reduce uncertainty as management proceeds. By developing alternative hypotheses, testing these hypotheses and adjusting management in response to outcomes, managers can probe dynamic mechanistic relationships among aboveground and belowground soil system components. In doing so, soil ecosystem services can be preserved and critical ecological thresholds avoided. Here, we present an adaptive management framework designed to reduce uncertainty surrounding the soil system, even when soil ecosystem services production is not the explicit management objective, so that managers can reach their management goals without undermining soil multifunctionality or contributing to an irreversible loss of soil ecosystem services. Copyright © 2016. Published by Elsevier Ltd.

  14. Pratt and Whitney Overview and Advanced Health Management Program

    NASA Technical Reports Server (NTRS)

    Inabinett, Calvin

    2008-01-01

    Hardware Development Activity: Design and Test Custom Multi-layer Circuit Boards for use in the Fault Emulation Unit; Logic design performed using VHDL; Layout power system for lab hardware; Work lab issues with software developers and software testers; Interface with Engine Systems personnel with performance of Engine hardware components; Perform off nominal testing with new engine hardware.

  15. 78 FR 71676 - NUREG-1482, Revision 2, “Guidelines for Inservice Testing at Nuclear Power Plants, Final Report”

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-29

    ... subtitled ``Inservice Testing of Pumps and Valves, and Inservice Examination and Testing of Dynamic... the inservice examination and testing of dynamic restraints (snubbers). ADDRESSES: Please refer to... CONTACT section of this document. NRC's Agencywide Documents Access and Management System (ADAMS): You may...

  16. Testing in a Personalized System of Instruction.

    ERIC Educational Resources Information Center

    Sides, Elizabeth; Edwards, K. Anthony

    The testing procedures used in an introductory psychology class at Utah State University are described. Students who had either taken the course earlier or were concurrently enrolled in the class served as testing managers. Rooms were capable of supporting up to 250 students during class time for written exams. "Permits" to take a test have…

  17. Crew Systems Laboratory/Building 7. Historical Documentation

    NASA Technical Reports Server (NTRS)

    Slovinac, Patricia

    2011-01-01

    Building 7 is managed by the Crew and Thermal Systems Division of the JSC Engineering Directorate. Originally named the Life Systems Laboratory, it contained five major test facilities: two advanced environmental control laboratories and three human-rated vacuum chambers (8 , 11 , and the 20 ). These facilities supported flight crew familiarization and the testing and evaluation of hardware used in the early manned spaceflight programs, including Gemini, Apollo, and the ASTP.

  18. Michael Deru | NREL

    Science.gov Websites

    development and testing of novel HVAC systems, building performance simulations, performance metrics for | 303-384-7503 Dr. Deru joined NREL in 2000 and manages the Systems Performance section in the

  19. 28 CFR 802.29 - Exemption of the Pretrial Services Agency System.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... THE DISTRICT OF COLUMBIA DISCLOSURE OF RECORDS Exemption of Records Systems Under the Privacy Act § 802.29 Exemption of the Pretrial Services Agency System. The Privacy Act permits specific systems of... Bail Agency Database (ABADABA) (CSOSA/PSA-1). (ii) Drug Test Management System (DTMS) (CSOSA/PSA-2...

  20. 28 CFR 802.29 - Exemption of the Pretrial Services Agency System.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... THE DISTRICT OF COLUMBIA DISCLOSURE OF RECORDS Exemption of Records Systems Under the Privacy Act § 802.29 Exemption of the Pretrial Services Agency System. The Privacy Act permits specific systems of... Bail Agency Database (ABADABA) (CSOSA/PSA-1). (ii) Drug Test Management System (DTMS) (CSOSA/PSA-2...

Top