47 CFR 87.69 - Maintenance tests.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 47 Telecommunication 5 2012-10-01 2012-10-01 false Maintenance tests. 87.69 Section 87.69... Operating Requirements and Procedures Operating Requirements § 87.69 Maintenance tests. The licensee may make routine maintenance tests on equipment other than emergency locator transmitters if there is no...
47 CFR 73.1520 - Operation for tests and maintenance.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 47 Telecommunication 4 2014-10-01 2014-10-01 false Operation for tests and maintenance. 73.1520 Section 73.1520 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES RADIO BROADCAST SERVICES Rules Applicable to All Broadcast Stations § 73.1520 Operation for tests and maintenance. (a) Broadcast stations may be...
47 CFR 73.1520 - Operation for tests and maintenance.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 47 Telecommunication 4 2012-10-01 2012-10-01 false Operation for tests and maintenance. 73.1520 Section 73.1520 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES RADIO BROADCAST SERVICES Rules Applicable to All Broadcast Stations § 73.1520 Operation for tests and maintenance. (a) Broadcast stations may be...
47 CFR 80.96 - Maintenance tests.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 47 Telecommunication 5 2014-10-01 2014-10-01 false Maintenance tests. 80.96 Section 80.96 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES STATIONS IN THE MARITIME SERVICES Operating Requirements and Procedures Operating Procedures-General § 80.96 Maintenance tests. Stations are authorized to...
49 CFR 236.1039 - Operations and Maintenance Manual.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 4 2010-10-01 2010-10-01 false Operations and Maintenance Manual. 236.1039... Train Control Systems § 236.1039 Operations and Maintenance Manual. (a) The railroad shall catalog and..., modification, inspection, and testing of the PTC system and have them in one Operations and Maintenance Manual...
Maintenance and operations decision support tool : Clarus regional demonstrations.
DOT National Transportation Integrated Search
2011-01-01
Weather affects almost all maintenance activity decisions. The Federal Highway Administration (FHWA) tested a new decision support system for maintenance in Iowa, Indiana, and Illinois called the Maintenance and Operations Decision Support System (MO...
47 CFR 80.96 - Maintenance tests.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 47 Telecommunication 5 2012-10-01 2012-10-01 false Maintenance tests. 80.96 Section 80.96... tests. Stations are authorized to engage in test transmissions necessary for maintenance of the station. Test transmissions must conform to appropriate test operating procedures. ...
Ground Software Maintenance Facility (GSMF) user's manual
NASA Technical Reports Server (NTRS)
Aquila, V.; Derrig, D.; Griffith, G.
1986-01-01
Instructions for the Ground Software Maintenance Facility (GSMF) system user is provided to operate the GSMF in all modes. The GSMF provides the resources for the Automatic Test Equipment (ATE) computer program maintenance (GCOS and GOAL). Applicable reference documents are listed. An operational overview and descriptions of the modes in terms of operator interface, options, equipment, material utilization, and operational procedures are contained. Test restart procedures are described. The GSMF documentation tree is presented including the user manual.
Operation and maintenance manual for a preprototype Sabatier carbon dioxide reduction subsystem
NASA Technical Reports Server (NTRS)
Kleiner, G. N.
1981-01-01
The manual delineates the procedures, precautions and necessary sequences of steps required to prepare the package for test, provide troubleshooting information and perform required maintenance by the operating crew. The manual is divided into five sections: Installation, Checkout, Operation, Failure Detection/Isolation and Maintenance.
TCMS operations and maintenance philosophy
NASA Technical Reports Server (NTRS)
Buehler, David P.; Griffin, Rock E.
1992-01-01
The purpose is to describe the basic philosophies of operating and maintaining the Test, Control, and Monitor System (TCMS) equipment. TCMS is a complex and sophisticated checkout system. Operations and maintenance processes developed to support it will be based upon current experience, but will be focused on the specific needs of TCMS in support of Space Station Freedom Program (SSFP) and related activities. An overview of the operations and maintenance goals and philosophies are presented. The assumptions, roles and responsibilities, concepts and interfaces for operation, on-line maintenance, off-line support, and Operations and Maintenance (O&M) personnel training on all TCMS equipment located at KSC are described.
Risk mitigation strategies for operations and maintenance activities.
DOT National Transportation Integrated Search
2012-04-01
The objective of this research was to investigate the application of integrated risk modeling to operations and maintenance activities, specifically moving operations, such as pavement testing, pavement marking, painting, snow removal, shoulder work,...
Maintenance manager's manual for small transit agencies. Special report 1985-1986
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fowler, W.
1988-03-01
This publication contains information to assist operators of transit agencies providing public transportation in rural and smaller urban areas to better manage their vehicle maintenance programs. The report includes discussions of maintenance management, maintenance programs preventive maintenance, recordkeeping, selection of type of maintenance operation, in-house maintenance, and maintenance practices. Also included are appendixes giving supplementary information about tire loads; lubrication oil; mechanic hand tools; shop tools; mechanic aptitude tests; technical training resources; maintenance management training resources; and lists of manufacturers of air-conditioning systems, wheelchair lifts and wheelchair ramps.
Test, Control and Monitor System maintenance plan
NASA Technical Reports Server (NTRS)
Buehler, David P.; Lougheed, M. J.
1993-01-01
The maintenance requirements for Test, Control, and Monitor System (TCMS) and the method for satisfying these requirements prior to First Need Date (FND) of the last TCMS set are described. The method for satisfying maintenance requirements following FND of the last TCMS set will be addressed by a revision to this plan. This maintenance plan serves as the basic planning document for maintenance of this equipment by the NASA Payloads Directorate (CM) and the Payload Ground Operations Contractor (PGOC) at KSC. The terms TCMS Operations and Maintenance (O&M), Payloads Logistics, TCMS Sustaining Engineering, Payload Communications, and Integrated Network Services refer to the appropriate NASA and PGOC organization. For the duration of their contract, the Core Electronic Contractor (CEC) will provide a Set Support Team (SST). One of the primary purposes of this team is to help NASA and PGOC operate and maintain TCMS. It is assumed that SST is an integral part of TCMS O&M. The purpose of this plan is to describe the maintenance concept for TCMS hardware and system software in order to facilitate activation, transition planning, and continuing operation. When software maintenance is mentioned in this plan, it refers to maintenance of TCMS system software.
48 CFR 242.202 - Assignment of contract administration.
Code of Federal Regulations, 2014 CFR
2014-10-01
..., charting, and geodesy services; (F) Base, post, camp, and station purchases; (G) Operation or maintenance... installation, test, and checkout of the missiles and associated equipment); (Q) Operation and maintenance of, or installation of equipment at, military test ranges, facilities, and installations; and (R) The...
48 CFR 242.202 - Assignment of contract administration.
Code of Federal Regulations, 2011 CFR
2011-10-01
..., charting, and geodesy services; (F) Base, post, camp, and station purchases; (G) Operation or maintenance... installation, test, and checkout of the missiles and associated equipment); (Q) Operation and maintenance of, or installation of equipment at, military test ranges, facilities, and installations; and (R) The...
48 CFR 242.202 - Assignment of contract administration.
Code of Federal Regulations, 2012 CFR
2012-10-01
..., charting, and geodesy services; (F) Base, post, camp, and station purchases; (G) Operation or maintenance... installation, test, and checkout of the missiles and associated equipment); (Q) Operation and maintenance of, or installation of equipment at, military test ranges, facilities, and installations; and (R) The...
48 CFR 242.202 - Assignment of contract administration.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., charting, and geodesy services; (F) Base, post, camp, and station purchases; (G) Operation or maintenance... installation, test, and checkout of the missiles and associated equipment); (Q) Operation and maintenance of, or installation of equipment at, military test ranges, facilities, and installations; and (R) The...
48 CFR 242.202 - Assignment of contract administration.
Code of Federal Regulations, 2013 CFR
2013-10-01
..., charting, and geodesy services; (F) Base, post, camp, and station purchases; (G) Operation or maintenance... installation, test, and checkout of the missiles and associated equipment); (Q) Operation and maintenance of, or installation of equipment at, military test ranges, facilities, and installations; and (R) The...
2015-03-26
TEST AND EVALUATION OF ULTRASONIC ADDITIVE MANUFACTURING (UAM) FOR A LARGE AREA MAINTENANCE...States Government. AFIT-ENV-MS-15-M-158 TEST AND EVALUATION OF ULTRASONIC ADDITIVE MANUFACTURING FOR A LARGE AREA MAINTENANCE SHELTER...Civil Engineer (CE) operations. This research replicates a Large Area Maintenance Shelter (LAMS) baseplate design for ultrasonic additive
Instruction manual model 600F, data transmission test set
NASA Technical Reports Server (NTRS)
1972-01-01
Information necessary for the operation and maintenance of the Model 600F Data Transmission Test Set is presented. A description is contained of the physical and functional characteristics; pertinent installation data; instructions for operating the equipment; general and detailed principles of operation; preventive and corrective maintenance procedures; and block, logic, and component layout diagrams of the equipment and its major component assemblies.
NASA Astrophysics Data System (ADS)
Serio, L.; Bremer, J.; Claudet, S.; Delikaris, D.; Ferlin, G.; Ferrand, F.; Pezzetti, M.; Pirotte, O.
2017-12-01
CERN operates and maintains the world largest cryogenic infrastructure ranging from ageing but well maintained installations feeding detectors, test facilities and general services, to the state-of-the-art cryogenic system serving the flagship LHC machine complex. A study was conducted and a methodology proposed to outsource to industry the operation and maintenance of the whole cryogenic infrastructure. The cryogenic installations coupled to non LHC-detectors, test facilities and general services infrastructure have been fully outsourced for operation and maintenance on the basis of performance obligations. The contractor is responsible for the operational performance of the installations based on a yearly operation schedule provided by CERN. The maintenance of the cryogenic system serving the LHC machine and its detectors has been outsourced on the basis of tasks oriented obligations, monitored by key performance indicators. CERN operation team, with the support of the contractor operation team, remains responsible for the operational strategy and performances. We report the analysis, strategy, definition of the requirements and technical specifications as well as the achieved technical and economic performances after one year of operation.
40 CFR 267.33 - What are the testing and maintenance requirements for the equipment?
Code of Federal Regulations, 2010 CFR
2010-07-01
... OPERATING UNDER A STANDARDIZED PERMIT Preparedness and Prevention § 267.33 What are the testing and maintenance requirements for the equipment? You must test and maintain all required facility communications or...
40 CFR 267.33 - What are the testing and maintenance requirements for the equipment?
Code of Federal Regulations, 2014 CFR
2014-07-01
... OPERATING UNDER A STANDARDIZED PERMIT Preparedness and Prevention § 267.33 What are the testing and maintenance requirements for the equipment? You must test and maintain all required facility communications or...
40 CFR 267.33 - What are the testing and maintenance requirements for the equipment?
Code of Federal Regulations, 2013 CFR
2013-07-01
... OPERATING UNDER A STANDARDIZED PERMIT Preparedness and Prevention § 267.33 What are the testing and maintenance requirements for the equipment? You must test and maintain all required facility communications or...
40 CFR 267.33 - What are the testing and maintenance requirements for the equipment?
Code of Federal Regulations, 2012 CFR
2012-07-01
... OPERATING UNDER A STANDARDIZED PERMIT Preparedness and Prevention § 267.33 What are the testing and maintenance requirements for the equipment? You must test and maintain all required facility communications or...
40 CFR 267.33 - What are the testing and maintenance requirements for the equipment?
Code of Federal Regulations, 2011 CFR
2011-07-01
... OPERATING UNDER A STANDARDIZED PERMIT Preparedness and Prevention § 267.33 What are the testing and maintenance requirements for the equipment? You must test and maintain all required facility communications or...
-7162 Don assists with the installation and maintenance of the NWTC's field test turbines as well as with test article installations and testing in the Structural Testing Laboratory and both dynamometer facilities. He participates in the operation and maintenance of the field test sites and meteorological
40 CFR 63.6125 - What are my monitor installation, operation, and maintenance requirements?
Code of Federal Regulations, 2012 CFR
2012-07-01
... Stationary Combustion Turbines Testing and Initial Compliance Requirements § 63.6125 What are my monitor installation, operation, and maintenance requirements? (a) If you are operating a stationary combustion turbine... emission control device, you must monitor on a continuous basis your catalyst inlet temperature in order to...
Design, fabrication, delivery, operation and maintenance of a geothermal power conversion system
NASA Technical Reports Server (NTRS)
1980-01-01
The design, fabrication, delivery, operation and maintenance of an Hydrothermal Power Company 1250 KVA geothermal power conversion system using a helical screw expander as the prime mover is described. Hydrostatic and acceptance testing are discussed.
ERIC Educational Resources Information Center
Minnesota State Dept. of Education, St. Paul. Div. of Vocational and Technical Education.
THIS MODULE OF A 30-MODULE COURSE IS DESIGNED TO PROVIDE A SUMMARY OF DIESEL ENGINE MAINTENANCE FACTORS AND A REVIEW OF DIESEL ENGINE ALTERNATOR OPERATION. THE SEVEN SECTIONS COVER DIESEL ENGINE TROUBLESHOOTING AND THE OPERATION, TESTING, AND ADJUSTING OF ALTERNATORS. THE MODULE CONSISTS OF A SELF-INSTRUCTIONAL BRANCH PROGRAMED TRAINING FILM…
Department of the Air Force Information Technology Program FY 95 President’s Budget
1994-03-01
2095 2200 552 900 1032 Description: Contractor hardware maintenan support, systems analyst support software development and maintenance, and off -the...hardware maintenance support, systems analyst support, operations support, configuration management, test support, and off -the-shelf software license...2419 2505 2594 Description: Contractor hardware maintenance support, systems analyst support, operations support, and off -the-shelf software license
30 CFR 250.516 - Blowout preventer system tests, inspections, and maintenance.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Well-Completion Operations § 250.516 Blowout preventer system tests, inspections, and maintenance. (a...) Test affected BOP components following the disconnection or repair of any well-pressure containment... you have well-control problems. You must conduct the required BOP test as soon as possible (i.e...
40 CFR 1048.410 - How must I select, prepare, and test my in-use engines?
Code of Federal Regulations, 2010 CFR
2010-07-01
... or used in an abnormal way; and (3) Documented in terms of total hours of operation, maintenance... comply before testing a total of ten engines. (d) You may do minimal maintenance to set components of a...)). Limit maintenance to what is in the owner's instructions for engines with that amount of service and age...
NASA Technical Reports Server (NTRS)
1975-01-01
A general description of the leading edge/flat surface heating array is presented along with its components, assembly instructions, installation instructions, operation procedures, maintenance instructions, repair procedures, schematics, spare parts lists, engineering drawings of the array, and functional acceptance test log sheets. The proper replacement of components, correct torque values, step-by-step maintenance instructions, and pretest checkouts are described.
7 CFR 1730.21 - Inspections and tests.
Code of Federal Regulations, 2010 CFR
2010-01-01
... reliability and security of the electric power grid, cause significant risk to the safety and health of the... AGRICULTURE ELECTRIC SYSTEM OPERATIONS AND MAINTENANCE Operations and Maintenance Requirements § 1730.21... parts of its electric system, annually exercise its ERP, and maintain records of such inspections and...
40 CFR 1039.125 - What maintenance instructions must I give to buyers?
Code of Federal Regulations, 2010 CFR
2010-07-01
... disqualify those engines from in-use testing or deny a warranty claim. Do not take these maintenance steps... specified special maintenance steps to address engine operation that is not atypical, or that the... ENGINES Emission Standards and Related Requirements § 1039.125 What maintenance instructions must I give...
33 CFR 150.508 - What are the maintenance and repair requirements for inflatable rescue boats?
Code of Federal Regulations, 2011 CFR
2011-07-01
... repair requirements for inflatable rescue boats? 150.508 Section 150.508 Navigation and Navigable Waters... repair requirements for inflatable rescue boats? The operator must perform the maintenance and repair of inflatable rescue boats according to the manufacturer's instructions. Operational Tests and Inspections...
33 CFR 150.508 - What are the maintenance and repair requirements for inflatable rescue boats?
Code of Federal Regulations, 2012 CFR
2012-07-01
... repair requirements for inflatable rescue boats? 150.508 Section 150.508 Navigation and Navigable Waters... repair requirements for inflatable rescue boats? The operator must perform the maintenance and repair of inflatable rescue boats according to the manufacturer's instructions. Operational Tests and Inspections...
33 CFR 150.508 - What are the maintenance and repair requirements for inflatable rescue boats?
Code of Federal Regulations, 2010 CFR
2010-07-01
... repair requirements for inflatable rescue boats? 150.508 Section 150.508 Navigation and Navigable Waters... repair requirements for inflatable rescue boats? The operator must perform the maintenance and repair of inflatable rescue boats according to the manufacturer's instructions. Operational Tests and Inspections...
33 CFR 150.508 - What are the maintenance and repair requirements for inflatable rescue boats?
Code of Federal Regulations, 2013 CFR
2013-07-01
... repair requirements for inflatable rescue boats? 150.508 Section 150.508 Navigation and Navigable Waters... repair requirements for inflatable rescue boats? The operator must perform the maintenance and repair of inflatable rescue boats according to the manufacturer's instructions. Operational Tests and Inspections...
33 CFR 150.508 - What are the maintenance and repair requirements for inflatable rescue boats?
Code of Federal Regulations, 2014 CFR
2014-07-01
... repair requirements for inflatable rescue boats? 150.508 Section 150.508 Navigation and Navigable Waters... repair requirements for inflatable rescue boats? The operator must perform the maintenance and repair of inflatable rescue boats according to the manufacturer's instructions. Operational Tests and Inspections...
OHD/HL/HSEB - Hydrologic Software Engineering Branch
analysis, design, development, testing, documentation, implementation, and maintenance of application and also responsible for the software maintenance and realtime operations of the Hydrometeorological
Control of Technology Transfer at JPL
NASA Technical Reports Server (NTRS)
Oliver, Ronald
2006-01-01
Controlled Technology: 1) Design: preliminary or critical design data, schematics, technical flow charts, SNV code/diagnostics, logic flow diagrams, wirelist, ICDs, detailed specifications or requirements. 2) Development: constraints, computations, configurations, technical analyses, acceptance criteria, anomaly resolution, detailed test plans, detailed technical proposals. 3) Production: process or how-to: assemble, operated, repair, maintain, modify. 4) Manufacturing: technical instructions, specific parts, specific materials, specific qualities, specific processes, specific flow. 5) Operations: how-to operate, contingency or standard operating plans, Ops handbooks. 6) Repair: repair instructions, troubleshooting schemes, detailed schematics. 7) Test: specific procedures, data, analysis, detailed test plan and retest plans, detailed anomaly resolutions, detailed failure causes and corrective actions, troubleshooting, trended test data, flight readiness data. 8) Maintenance: maintenance schedules and plans, methods for regular upkeep, overhaul instructions. 9) Modification: modification instructions, upgrades kit parts, including software
49 CFR 234.257 - Warning system operation.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 49 Transportation 4 2012-10-01 2012-10-01 false Warning system operation. 234.257 Section 234.257... EMERGENCY NOTIFICATION SYSTEMS Maintenance, Inspection, and Testing Inspections and Tests § 234.257 Warning system operation. (a) Each highway-rail crossing warning system shall be tested to determine that it...
49 CFR 234.257 - Warning system operation.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 49 Transportation 4 2014-10-01 2014-10-01 false Warning system operation. 234.257 Section 234.257... EMERGENCY NOTIFICATION SYSTEMS Maintenance, Inspection, and Testing Inspections and Tests § 234.257 Warning system operation. (a) Each highway-rail crossing warning system shall be tested to determine that it...
49 CFR 234.257 - Warning system operation.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 49 Transportation 4 2013-10-01 2013-10-01 false Warning system operation. 234.257 Section 234.257... EMERGENCY NOTIFICATION SYSTEMS Maintenance, Inspection, and Testing Inspections and Tests § 234.257 Warning system operation. (a) Each highway-rail crossing warning system shall be tested to determine that it...
14 CFR 91.1109 - Aircraft maintenance: Inspection program.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 2 2012-01-01 2012-01-01 false Aircraft maintenance: Inspection program... Ownership Operations Program Management § 91.1109 Aircraft maintenance: Inspection program. Each program... conduct of inspections for the particular make and model aircraft, including necessary tests and checks...
14 CFR 91.1109 - Aircraft maintenance: Inspection program.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Aircraft maintenance: Inspection program... Ownership Operations Program Management § 91.1109 Aircraft maintenance: Inspection program. Each program... conduct of inspections for the particular make and model aircraft, including necessary tests and checks...
14 CFR 91.1109 - Aircraft maintenance: Inspection program.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 2 2014-01-01 2014-01-01 false Aircraft maintenance: Inspection program... Ownership Operations Program Management § 91.1109 Aircraft maintenance: Inspection program. Each program... conduct of inspections for the particular make and model aircraft, including necessary tests and checks...
40 CFR 98.124 - Monitoring and QA/QC requirements.
Code of Federal Regulations, 2012 CFR
2012-07-01
... efficiency test provided that the design, operation, or maintenance of the destruction device has not changed... the last emissions test), you must repeat the emission characterization. Perform the emission... process vent, previous test results, provided the tests are representative of current operating conditions...
40 CFR 98.124 - Monitoring and QA/QC requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
... efficiency test provided that the design, operation, or maintenance of the destruction device has not changed... the last emissions test), you must repeat the emission characterization. Perform the emission... process vent, previous test results, provided the tests are representative of current operating conditions...
10-MWe solar-thermal central-receiver pilot plant. Operating and maintenance manual
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1979-08-01
Information required to perform the initial program loading and operation of the Heliostat Array Controller (HAC) is provided. Operating activities are described as required for heliostat control. All computer console command steps, from power up to power down are described. Detailed steps are provided to wake up the system and direct heliostat beams to standby, on target, standby to stow and power down. Maintenance requirements (preventive and corrective), reparability (reparable - non-reparable decisions), spares identification, spares storage location, replacement levels, replacement location and repair location are established. Individual system breakdown block diagrams are provided for each system/assembly/subassembly. Maintenance and repairmore » description sheets are provided for each maintenance significant item. The manual provides support of the following equipment: (a) helostat assembly; (b) heliostat control assembly; and (c) maintenance and installation equipment. The safety requirements for the operating and maintenance functions are established. These procedures will assist in eliminating or controlling the accident potentials caused by human error, environment, or component malfunctions or interactions that could result in major injury or fatality to operating or visiting personnel, or damage to subsystem components or support equipment. These procedures are for normal and test operating conditions and emergency situations, and apply to all Martin Marietta Corporation, governmental, operating and visitor personnel. (LEW)« less
The Development and Deployment of a Maintenance Operations Safety Survey.
Langer, Marie; Braithwaite, Graham R
2016-11-01
Based on the line operations safety audit (LOSA), two studies were conducted to develop and deploy an equivalent tool for aircraft maintenance: the maintenance operations safety survey (MOSS). Safety in aircraft maintenance is currently measured reactively, based on the number of audit findings, reportable events, incidents, or accidents. Proactive safety tools designed for monitoring routine operations, such as flight data monitoring and LOSA, have been developed predominantly for flight operations. In Study 1, development of MOSS, 12 test peer-to-peer observations were collected to investigate the practicalities of this approach. In Study 2, deployment of MOSS, seven expert observers collected 56 peer-to-peer observations of line maintenance checks at four stations. Narrative data were coded and analyzed according to the threat and error management (TEM) framework. In Study 1, a line check was identified as a suitable unit of observation. Communication and third-party data management were the key factors in gaining maintainer trust. Study 2 identified that on average, maintainers experienced 7.8 threats (operational complexities) and committed 2.5 errors per observation. The majority of threats and errors were inconsequential. Links between specific threats and errors leading to 36 undesired states were established. This research demonstrates that observations of routine maintenance operations are feasible. TEM-based results highlight successful management strategies that maintainers employ on a day-to-day basis. MOSS is a novel approach for safety data collection and analysis. It helps practitioners understand the nature of maintenance errors, promote an informed culture, and support safety management systems in the maintenance domain. © 2016, Human Factors and Ergonomics Society.
The Development and Deployment of a Maintenance Operations Safety Survey
Langer, Marie; Braithwaite, Graham R.
2016-01-01
Objective: Based on the line operations safety audit (LOSA), two studies were conducted to develop and deploy an equivalent tool for aircraft maintenance: the maintenance operations safety survey (MOSS). Background: Safety in aircraft maintenance is currently measured reactively, based on the number of audit findings, reportable events, incidents, or accidents. Proactive safety tools designed for monitoring routine operations, such as flight data monitoring and LOSA, have been developed predominantly for flight operations. Method: In Study 1, development of MOSS, 12 test peer-to-peer observations were collected to investigate the practicalities of this approach. In Study 2, deployment of MOSS, seven expert observers collected 56 peer-to-peer observations of line maintenance checks at four stations. Narrative data were coded and analyzed according to the threat and error management (TEM) framework. Results: In Study 1, a line check was identified as a suitable unit of observation. Communication and third-party data management were the key factors in gaining maintainer trust. Study 2 identified that on average, maintainers experienced 7.8 threats (operational complexities) and committed 2.5 errors per observation. The majority of threats and errors were inconsequential. Links between specific threats and errors leading to 36 undesired states were established. Conclusion: This research demonstrates that observations of routine maintenance operations are feasible. TEM-based results highlight successful management strategies that maintainers employ on a day-to-day basis. Application: MOSS is a novel approach for safety data collection and analysis. It helps practitioners understand the nature of maintenance errors, promote an informed culture, and support safety management systems in the maintenance domain. PMID:27411354
40 CFR 63.563 - Compliance and performance testing.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Standards for Marine Tank Vessel Loading Operations § 63.563 Compliance and performance testing. (a) The... indirectly, shall be secured closed during marine tank vessel loading operations either by using a car-seal... devices, sampling, and venting for maintenance. Marine tank vessel loading operations shall not be...
40 CFR 63.563 - Compliance and performance testing.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Standards for Marine Tank Vessel Loading Operations § 63.563 Compliance and performance testing. (a) The... indirectly, shall be secured closed during marine tank vessel loading operations either by using a car-seal... devices, sampling, and venting for maintenance. Marine tank vessel loading operations shall not be...
Integration and testing of a multistack automated cone machine
DOT National Transportation Integrated Search
2004-06-01
The Advanced Highway Maintenance and Construction Technology (AHMCT) Research Center has been developing robotic equipment and machinery for highway maintenance and construction operations. It is a cooperative venture between the University of Califo...
Mechanical systems readiness assessment and performance monitoring study
NASA Technical Reports Server (NTRS)
1972-01-01
The problem of mechanical devices which lack the real-time readiness assessment and performance monitoring capability required for future space missions is studied. The results of a test program to establish the feasibility of implementing structure borne acoustics, a nondestructive test technique, are described. The program included the monitoring of operational acoustic signatures of five separate mechanical components, each possessing distinct sound characteristics. Acoustic signatures were established for normal operation of each component. Critical failure modes were then inserted into the test components, and faulted acoustic signatures obtained. Predominant features of the sound signature were related back to operational events occurring within the components both for normal and failure mode operations. All of these steps can be automated. The structure borne acoustics technique lends itself to reducing checkout time, simplifying maintenance procedures, and reducing manual involvement in the checkout, operation, maintenance, and fault diagnosis of mechanical systems.
Comparative Anatomy of Maintenance Tasks (CAMT): A Feasibility Study
1992-03-01
systems. Methods for task primitive definition were developed, then taken into the field for testing . Task primitives were defined to cover three remove...engine maintenance) and to test whether task primitives developed for one weapon system could have applicability to other weapon systems (Phase 2...requirements, levying MPT constraints and predicting MPT requirements are only ritualistic exercises until the operational test and evaluation of a
10 CFR 60.131 - General design criteria for the geologic repository operations area.
Code of Federal Regulations, 2012 CFR
2012-01-01
... operating systems, including alarm systems, important to safety. (g) Inspection, testing, and maintenance... radioactivity areas; and (6) A radiation alarm system to warn of significant increases in radiation levels... system shall be designed with provisions for calibration and for testing its operability. (b) Protection...
10 CFR 60.131 - General design criteria for the geologic repository operations area.
Code of Federal Regulations, 2014 CFR
2014-01-01
... operating systems, including alarm systems, important to safety. (g) Inspection, testing, and maintenance... radioactivity areas; and (6) A radiation alarm system to warn of significant increases in radiation levels... system shall be designed with provisions for calibration and for testing its operability. (b) Protection...
10 CFR 60.131 - General design criteria for the geologic repository operations area.
Code of Federal Regulations, 2011 CFR
2011-01-01
... operating systems, including alarm systems, important to safety. (g) Inspection, testing, and maintenance... radioactivity areas; and (6) A radiation alarm system to warn of significant increases in radiation levels... system shall be designed with provisions for calibration and for testing its operability. (b) Protection...
10 CFR 60.131 - General design criteria for the geologic repository operations area.
Code of Federal Regulations, 2013 CFR
2013-01-01
... operating systems, including alarm systems, important to safety. (g) Inspection, testing, and maintenance... radioactivity areas; and (6) A radiation alarm system to warn of significant increases in radiation levels... system shall be designed with provisions for calibration and for testing its operability. (b) Protection...
The Application of Surface Potential Test on Hand-making Insulation for Generator Stator End-winding
NASA Astrophysics Data System (ADS)
Lu, Zhu-mao; Liu, Qing; Wang, Tian-zheng; Bai, Lu; Li, Yan-peng
2017-05-01
This paper presents the advantage of surface potential test on hand-making insulation for generator stator end-winding insulation detection, compared with DC or AC withstand voltage test, also details the test principle, connection method and test notes. And through the case, surface potential test on hand-making insulation proved effective for insulation quality detection after generator stator end-winding maintenance, and the experimental data is useful and reliable for the electrical equipment operation and maintenance in the power plant.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Caudell, R.B.; Bauder, M.E.; Boyer, W.B.
1993-09-01
Sandia National Laboratories (SNL) Instrumentation Development Department was tasked by the Defense Nuclear Agency (DNA) to record data on Tektronix RTD720 Digitizers on the HUNTERS TROPHY field test conducted at the Nevada Test Site (NTS) on September 18, 1992. This report contains a overview and description of the computer hardware and software that was used to acquire, reduce, and display the data. The document is divided into two volumes: an overview and operators manual (Volume 1) and a maintenance manual (Volume 2).
THE EFFECTS OF MAINTENANCE ACTIONS ON THE PFDavg OF SPRING OPERATED PRESSURE RELIEF VALVES
DOE Office of Scientific and Technical Information (OSTI.GOV)
Harris, S.; Gross, R.
2014-04-01
The safety integrity level (SIL) of equipment used in safety instrumented functions is determined by the average probability of failure on demand (PFDavg) computed at the time of periodic inspection and maintenance, i.e., the time of proof testing. The computation of PFDavg is generally based solely on predictions or estimates of the assumed constant failure rate of the equipment. However, PFDavg is also affected by maintenance actions (or lack thereof) taken by the end user. This paper shows how maintenance actions can affect the PFDavg of spring operated pressure relief valves (SOPRV) and how these maintenance actions may be accountedmore » for in the computation of the PFDavg metric. The method provides a means for quantifying the effects of changes in maintenance practices and shows how these changes impact plant safety.« less
The Effects of Maintenance Actions on the PFDavg of Spring Operated Pressure Relief Valves
Harris, S.; Gross, R.; Goble, W; ...
2015-12-01
The safety integrity level (SIL) of equipment used in safety instrumented functions is determined by the average probability of failure on demand (PFDavg) computed at the time of periodic inspection and maintenance, i.e., the time of proof testing. The computation of PFDavg is generally based solely on predictions or estimates of the assumed constant failure rate of the equipment. However, PFDavg is also affected by maintenance actions (or lack thereof) taken by the end user. This paper shows how maintenance actions can affect the PFDavg of spring operated pressure relief valves (SOPRV) and how these maintenance actions may be accountedmore » for in the computation of the PFDavg metric. The method provides a means for quantifying the effects of changes in maintenance practices and shows how these changes impact plant safety.« less
Effects of maintenance operations on track buckling potential
DOT National Transportation Integrated Search
2003-05-04
This paper presents the results of buckling analyses based on data from recent tests determining the influence of track maintenance and consolidation on track lateral resistance. The buckling analyses were performed using the USDOT/Volpe "CWR-SAFE" m...
Operational Test and Evaluation Manual
2011-06-28
Fiscal Office manages all funds received throughout the year for Operations and Maintenance Marine Corps (O&MMC); Research , Development, Test, and... Research , Development, and Acquisition) Assistant Secretary of the Navy ( Research , Development, and Acquisition) (ASN (RDA)) is the DOD’s Component...entire acquisition cycle (SECNAV 2008). This accumulation of data starts with early research and developmental testing and Other tests and
Science Kent.Terwilliger@nrel.gov | 303-384-6254 Research Interests Environmental Testing of PV Modules Maintenance and operation of environmental testing; tracking of module testing. Troubleshooting and repairing
40 CFR 75.22 - Reference test methods.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 17 2012-07-01 2012-07-01 false Reference test methods. 75.22 Section...) CONTINUOUS EMISSION MONITORING Operation and Maintenance Requirements § 75.22 Reference test methods. (a) The owner or operator shall use the following methods, which are found in appendices A-1 through A-4 to part...
49 CFR 236.1043 - Task analysis and basic requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Positive Train Control Systems § 236.1043 Task analysis and basic requirements. (a) Training structure and... installation, maintenance, repair, modification, inspection, testing, and operating tasks that must be...
49 CFR 236.1043 - Task analysis and basic requirements.
Code of Federal Regulations, 2013 CFR
2013-10-01
..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Positive Train Control Systems § 236.1043 Task analysis and basic requirements. (a) Training structure and... installation, maintenance, repair, modification, inspection, testing, and operating tasks that must be...
49 CFR 236.1043 - Task analysis and basic requirements.
Code of Federal Regulations, 2014 CFR
2014-10-01
..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Positive Train Control Systems § 236.1043 Task analysis and basic requirements. (a) Training structure and... installation, maintenance, repair, modification, inspection, testing, and operating tasks that must be...
49 CFR 236.1043 - Task analysis and basic requirements.
Code of Federal Regulations, 2012 CFR
2012-10-01
..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Positive Train Control Systems § 236.1043 Task analysis and basic requirements. (a) Training structure and... installation, maintenance, repair, modification, inspection, testing, and operating tasks that must be...
49 CFR 236.1043 - Task analysis and basic requirements.
Code of Federal Regulations, 2011 CFR
2011-10-01
..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Positive Train Control Systems § 236.1043 Task analysis and basic requirements. (a) Training structure and... installation, maintenance, repair, modification, inspection, testing, and operating tasks that must be...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Anderson, J.L.; Jenkins, E.M.; Walthers, C.R.
Compound cryopumps have been added to the Tritium Systems Test Assembly (TSTA) integrated fusion fuel loop. Operations have been performed which closely simulate an actual fusion reactor pumping scenario. In addition, performance data have been taken that support the concept of using coconut charcoal as a sorbent at 4K for pumping helium. Later tests show that coconut charcoal may be used to co-pump D,T and He mixtures on a single 4K panel. Rotary spiral pumps have been used successfully in several applications at TSTA and have acquired more than 9000 hours of maintenance-free operation. Metal bellows pumps have been usedmore » to back the spiral pumps and have been relatively trouble free in loop operations. Bellows pumps also have more than 9000 hours of maintenance-free operation. 5 refs., 6 figs.« less
NASA Technical Reports Server (NTRS)
1981-01-01
The Kennedy Space Center (KSC) Management System for the Inertial Upper Stage (IUS) - spacecraft processing from KSC arrival through launch is described. The roles and responsibilities of the agencies and test team organizations involved in IUS-S/C processing at KSC for non-Department of Defense missions are described. Working relationships are defined with respect to documentation preparation, coordination and approval, schedule development and maintenance, test conduct and control, configuration management, quality control and safety. The policy regarding the use of spacecraft contractor test procedures, IUS contractor detailed operating procedures and KSC operations and maintenance instructions is defined. Review and approval requirements for each documentation system are described.
49 CFR 234.203 - Control circuits.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 49 Transportation 4 2013-10-01 2013-10-01 false Control circuits. 234.203 Section 234.203... EMERGENCY NOTIFICATION SYSTEMS Maintenance, Inspection, and Testing Maintenance Standards § 234.203 Control circuits. All control circuits that affect the safe operation of a highway-rail grade crossing warning...
49 CFR 234.203 - Control circuits.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 49 Transportation 4 2014-10-01 2014-10-01 false Control circuits. 234.203 Section 234.203... EMERGENCY NOTIFICATION SYSTEMS Maintenance, Inspection, and Testing Maintenance Standards § 234.203 Control circuits. All control circuits that affect the safe operation of a highway-rail grade crossing warning...
Literature and best practices scan : Vehicle Inspection and Maintenance (I/M) Programs
DOT National Transportation Integrated Search
2002-06-01
The state of Wisconsin operates one of the nation's most effective inspection/maintenance (I/M) programs. In Wisconsin's I/M program, vehicles registered in the Milwaukee metropolitan area are subjected to a transient emission test using the IM240 te...
DOT National Transportation Integrated Search
2013-08-01
Portable roll-up signs are currently used by the Texas Department of Transportation for identification of short-term maintenance/work zones and emergency operations. These signs have fiberglass frames that directly support diamond-shaped and rectangu...
75 FR 19665 - Final Regulatory Guide: Issuance, Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-15
... processes, including welding, heat treating, and nondestructive testing, are controlled and accomplished by... that when stressed under operating, maintenance, testing, and postulated accident conditions (1) the...
Autonomy and automation for Space Station housekeeping and maintenance functions
NASA Technical Reports Server (NTRS)
Turner, P. R.
1983-01-01
The Space Station crew will be a critical resource for economical operation of science and commercial payloads. Core station housekeeping and maintenance functions should be provided in a manner that requires a minimum of crew interaction. This paper outlines a prospective functional architecture for allocation of autonomous and automated control of these functions and discusses implementation issues arising from safety of manned operations, integration test requirements, and evolution of future station capabilities.
1977-05-01
444 EN 2 31043 TEST UNIT INJECTORS AND/OR FUEL INJECTION NOZZLES 445 EN 2 31044 MAINTENANCE OF FUEL OIL INJECTORS 446 EN 2 31049 PREVENTION OF...OPERATIONAL MAINTENANCE OF DIESEL ENGINES OPERATE INTERNAL COMBUSTION ENGINES JACKING GEAR ON INTERNAL COMBUSTION ENGINES CARRYOUT TURNING OVER OF MAIN...ENGINES ALIGN LUBRICATING OIL SYSTEM USE OF STANDBY LUBRICATING OIL PUMPS PURGE DIESEL ENGINE FUEL INJECTION SYSTEM ENTRIES TO MAIN PROPULSION
10. VIEW WITHIN THE EAST OPERATING GALLERY OF WORK STATION ...
10. VIEW WITHIN THE EAST OPERATING GALLERY OF WORK STATION WITH MANIPULATOR ARMS. - Nevada Test Site, Engine Maintenance Assembly & Disassembly Facility, Area 25, Jackass Flats, Mercury, Nye County, NV
EVA Development and Verification Testing at NASA's Neutral Buoyancy Laboratory
NASA Technical Reports Server (NTRS)
Jairala, Juniper C.; Durkin, Robert; Marak, Ralph J.; Sipila, Stepahnie A.; Ney, Zane A.; Parazynski, Scott E.; Thomason, Arthur H.
2012-01-01
As an early step in the preparation for future Extravehicular Activities (EVAs), astronauts perform neutral buoyancy testing to develop and verify EVA hardware and operations. Neutral buoyancy demonstrations at NASA Johnson Space Center's Sonny Carter Training Facility to date have primarily evaluated assembly and maintenance tasks associated with several elements of the International Space Station (ISS). With the retirement of the Shuttle, completion of ISS assembly, and introduction of commercial players for human transportation to space, evaluations at the Neutral Buoyancy Laboratory (NBL) will take on a new focus. Test objectives are selected for their criticality, lack of previous testing, or design changes that justify retesting. Assembly tasks investigated are performed using procedures developed by the flight hardware providers and the Mission Operations Directorate (MOD). Orbital Replacement Unit (ORU) maintenance tasks are performed using a more systematic set of procedures, EVA Concept of Operations for the International Space Station (JSC-33408), also developed by the MOD. This paper describes the requirements and process for performing a neutral buoyancy test, including typical hardware and support equipment requirements, personnel and administrative resource requirements, examples of ISS systems and operations that are evaluated, and typical operational objectives that are evaluated.
Operation of the Uinta Basin Seismological Observatory.
The report describes the operations of the Uinta Basin Seismological Observatory (UBSO) from 1 January through 31 March 1969. Also discussed are the maintenance and testing of the UBSO digital data acquisition system. (Author)
Prevalence of operator fatigue in winter maintenance operations.
Camden, Matthew C; Medina-Flintsch, Alejandra; Hickman, Jeffrey S; Bryce, James; Flintsch, Gerardo; Hanowski, Richard J
2018-02-02
Similar to commercial motor vehicle drivers, winter maintenance operators are likely to be at an increased risk of becoming fatigued while driving due to long, inconsistent shifts, environmental stressors, and limited opportunities for sleep. Despite this risk, there is little research concerning the prevalence of winter maintenance operator fatigue during winter emergencies. The purpose of this research was to investigate the prevalence, sources, and countermeasures of fatigue in winter maintenance operations. Questionnaires from 1043 winter maintenance operators and 453 managers were received from 29 Clear Road member states. Results confirmed that fatigue was prevalent in winter maintenance operations. Over 70% of the operators and managers believed that fatigue has a moderate to significant impact on winter maintenance operations. Approximately 75% of winter maintenance operators reported to at least sometimes drive while fatigued, and 96% of managers believed their winter maintenance operators drove while fatigued at least some of the time. Furthermore, winter maintenance operators and managers identified fatigue countermeasures and sources of fatigue related to winter maintenance equipment. However, the countermeasures believed to be the most effective at reducing fatigue during winter emergencies (i.e., naps) were underutilized. For example, winter maintenance operators reported to never use naps to eliminate fatigue. These results indicated winter maintenance operations are impacted by operator fatigue. These results support the increased need for research and effective countermeasures targeting winter maintenance operator fatigue. Copyright © 2018 Elsevier Ltd. All rights reserved.
Test Operations Procedure (TOP) 3-2-045 Small Arms - Hand and Shoulder Weapons and Machine Guns
2007-09-17
often referred to as “field strip and clean”). More detailed maintenance will be done as needed. All maintenance actions will be recorded. TOP...of weapon after complete disassembly. (3) Dismounting of the operating parts and magazine or feeder (field strip ). (4) Assembly of...optical or laser ) as necessary to check alignment to the target aiming point if the weapon is not equipped with sights. For weapons capable of
Health maintenance facility: Dental equipment requirements
NASA Technical Reports Server (NTRS)
Young, John; Gosbee, John; Billica, Roger
1991-01-01
The objectives were to test the effectiveness of the Health Maintenance Facility (HMF) dental suction/particle containment system, which controls fluids and debris generated during simulated dental treatment, in microgravity; to test the effectiveness of fiber optic intraoral lighting systems in microgravity, while simulating dental treatment; and to evaluate the operation and function of off-the-shelf dental handheld instruments, namely a portable dental hand drill and temporary filling material, in microgravity. A description of test procedures, including test set-up, flight equipment, and the data acquisition system, is given.
NASA Astrophysics Data System (ADS)
Permata Shabrina, Ayu; Pramuditya Soesanto, Rayinda; Kurniawati, Amelia; Teguh Kurniawan, Mochamad; Andrawina, Luciana
2018-03-01
Knowledge is a combination of experience, value, and information that is based on the intuition that allows an organization to evaluate and combine new information. In an organization, knowledge is not only attached to document but also in routine value creating activities, therefore knowledge is an important asset for the organization. X Corp is a company that focused on manufacturing aerospace components. In carrying out the production process, the company is supported by various machines, one of the machines is Toshiba BMC 80.5. The machine is used occasionally and therefore maintenance activity is needed, especially corrective maintenance. Corrective maintenance is done to make a breakdown machine back to work. Corrective maintenance is done by maintenance operator whose retirement year is close. The long term experience of the maintenance operator needs to be captured by the organization and shared across maintenance division. E-learning is one type of media that can support and assist knowledge sharing. This research purpose is to create the e-learning content for best practice of corrective maintenance activity for Toshiba BMC 80.5 by extracting the knowledge and experience from the operator based on knowledge conversion using SECI method. The knowledge source in this research is a maintenance supervisor and a senior maintenance engineer. From the evaluation of the e-learning content, it is known that the average test score of the respondents who use the e-learning increases from 77.5 to 87.5.
14. VIEW IN THE WEST OPERATING GALLERY OF POSTMORTEM CELL ...
14. VIEW IN THE WEST OPERATING GALLERY OF POST-MORTEM CELL WORK STATION AND MANIPULATOR ARMS. - Nevada Test Site, Engine Maintenance Assembly & Disassembly Facility, Area 25, Jackass Flats, Mercury, Nye County, NV
Feasibility Analysis and Prototyping of a Fast Autonomous Recon system
2017-06-01
Test and Evaluation Interim Contractor Support System Assessment OPERATIONAL USE AND SYSTEM SUPPORT System Operation in the User Environment...Sustaining Maintenance and Logistics Support Operational Testing System Modifications for Improvement Contractor Support System Assessment...helicopter but has the added benefit of high -speed flight similar to a fixed-wing aircraft. Figure 1 shows the two different flight modes of the V-22
Solar heating and cooling system design and development
NASA Technical Reports Server (NTRS)
1978-01-01
The development of eight prototype solar heating and combined heating and cooling systems is reported. Manufacture, test, installation, maintenance, problem resolution, and monitoring the operation of prototype systems is included. Heating and cooling equipment for single family residential and commercial applications and eight operational test sites (four heating and four heating and cooling) is described.
NASA Technical Reports Server (NTRS)
Augustynowicz, S. D.; Fesmire, J. E.; Wikstrom, J. P.
1999-01-01
The results of a comparative study of cryogenic insulation systems performed are presented. The key aspects of thermal insulation relative to cryogenic system design, testing, manufacturing, and maintenance are discussed. An overview of insulation development from an energy conservation perspective is given. Conventional insulation materials for cryogenic applications provide three levels of thermal conductivity. Actual thermal performance of standard multilayer insulation (MLI) is several times less than laboratory performance and often 10 times worse than ideal performance. The cost-effectiveness of the insulation system depends on thermal performance; flexibility and durability; ease of use in handling, installation, and maintenance; and overall cost including operations, maintenance, and life cycle. Results of comprehensive testing of both conventional and novel materials such as aerogel composites using cryostat boil-off methods are given. The development of efficient, robust cryogenic insulation systems that operate at a soft vacuum level is the primary focus of this paper.
Embracing Safe Ground Test Facility Operations and Maintenance
NASA Technical Reports Server (NTRS)
Dunn, Steven C.; Green, Donald R.
2010-01-01
Conducting integrated operations and maintenance in wind tunnel ground test facilities requires a balance of meeting due dates, efficient operation, responsiveness to the test customer, data quality, effective maintenance (relating to readiness and reliability), and personnel and facility safety. Safety is non-negotiable, so the balance must be an "and" with other requirements and needs. Pressure to deliver services faster at increasing levels of quality in under-maintained facilities is typical. A challenge for management is to balance the "need for speed" with safety and quality. It s especially important to communicate this balance across the organization - workers, with a desire to perform, can be tempted to cut corners on defined processes to increase speed. Having a lean staff can extend the time required for pre-test preparations, so providing a safe work environment for facility personnel and providing good stewardship for expensive National capabilities can be put at risk by one well-intending person using at-risk behavior. This paper documents a specific, though typical, operational environment and cites management and worker safety initiatives and tools used to provide a safe work environment. Results are presented and clearly show that the work environment is a relatively safe one, though still not good enough to keep from preventing injury. So, the journey to a zero injury work environment - both in measured reality and in the minds of each employee - continues. The intent of this paper is to provide a benchmark for others with operational environments and stimulate additional sharing and discussion on having and keeping a safe work environment.
Maintenance and Logistics Support for the International Monitoring System Network of the CTBTO
NASA Astrophysics Data System (ADS)
Haslinger, F.; Brely, N.; Akrawy, M.
2007-05-01
The global network of the International Monitoring System (IMS) of the Comprehensive Nuclear-Test-Ban Treaty Organization (CTBTO), once completed, will consist of 321 monitoring facilities of four different technologies: hydroacoustic, seismic, infrasonic, and radionuclide. As of today, about 65% of the installations are completed and contribute data to the products issued by the International Data Centre (IDC) of the CTBTO. In order to accomplish the task to reliably collect evidence for any potential nuclear test explosion anywhere on the planet, all stations are required to perform to very high data availability requirements (at least 98% data availability over a 12-month period). To enable reaching this requirement, a three-layer concept has been developed to allow efficient support of the IMS stations: Operations, Maintenance and Logistics, and Engineering. Within this concept Maintenance and Logistics provide second level support of the stations, whereby problems arising at the station are assigned through the IMS ticket system to Maintenance if they cannot be resolved on the Operations level. Maintenance will then activate the required resources to appropriately address and ultimately resolve the problem. These resources may be equipment support contracts, other third party contracts, or the dispatch of a maintenance team. Engineering Support will be activated if the problem requires redesign of the station or after catastrophic failures when a total rebuild of a station may be necessary. In this model, Logistics Support is responsible for parts replenishment and support contract management. Logistics Support also collects and analyzes relevant failure mode and effect information, develops supportability models, and has the responsibility for document management, obsolescence, risk & quality, and configuration management, which are key elements for efficient station support. Maintenance Support in addition is responsible for maintenance strategies, for planning and oversight of the execution of preventive maintenance programs by the Station Operators, and for review of operational troubleshooting procedures used in first level support. Particular challenges for the efficient and successful Maintenance and Logistics Support of the IMS network lie in the specific political boundary conditions regulating its implementation, in the fact that all IMS facilities and their equipment are owned by the respective host countries, and in finding the appropriate balance between outsourcing services and retaining essential in-house expertise.
2016-09-01
Some technologies that were not included in the analysis (due to site-level evaluations), but could be added in the future, include: wind turbines ...number of entities involved in the procurement, operation, maintenance , testing, and fueling of the generators, detailed inventory and cost data is...difficult to obtain. The DPW is often understaffed, leading to uneven testing and maintenance of the equipment despite their best efforts. The
2016-10-04
analysis (due to site-level evaluations), but could be added in the future, include: wind turbines (the installations we visited were not interested due...procurement, operation, maintenance , testing, and fueling of the generators, detailed inventory and cost data is difficult to obtain. The DPW is often...understaffed, leading to uneven testing and maintenance of the equipment despite their best efforts. The reliability of these generators is typically
DOE Office of Scientific and Technical Information (OSTI.GOV)
Easton, C. R.
The objectives of this program are to establish a heliostat design with the associated manufacturing, assembly, installation and maintenance approaches that will: (1) yield a significant reduction of capital and operating costs; (2) meet performance specifications for large collector subsystems; and (3) can be produced and deployed throughout the southwestern United States. In addition, cost plans and schedules to develop, fabricate, and operate the heliostat are to be developed. This volume presents the collector design, including trade study and test results, and the manufacturing, installation and checkout, and operations and maintenance concepts. Also, a discussion of specification verification and optimizationmore » is included. (WHK)« less
Logistics Operations Management Center: Maintenance Support Baseline (LOMC-MSB)
NASA Technical Reports Server (NTRS)
Kurrus, R.; Stump, F.
1995-01-01
The Logistics Operations Management Center Maintenance Support Baseline is defined. A historical record of systems, applied to and deleted from, designs in support of future management and/or technical analysis is provided. All Flight elements, Ground Support Equipment, Facility Systems and Equipment and Test Support Equipment for which LOMC has responsibilities at Kennedy Space Center and other locations are listed. International Space Station Alpha Program documentation is supplemented. The responsibility of the Space Station Launch Site Support Office is established.
16. VIEW OF FIRST FLOOR EAST OPERATING GALLERY. NOTE THE ...
16. VIEW OF FIRST FLOOR EAST OPERATING GALLERY. NOTE THE SERIES OF MANIPULATOR ARMS ALONG THE LEFT WALL. - Nevada Test Site, Engine Maintenance Assembly & Disassembly Facility, Area 25, Jackass Flats, Mercury, Nye County, NV
Dempsey, Patrick G; Pollard, Jonisha; Porter, William L; Mayton, Alan; Heberger, John R; Gallagher, Sean; Reardon, Leanna; Drury, Colin G
2017-12-01
The development and testing of ergonomics and safety audits for small and bulk bag filling, haul truck and maintenance and repair operations in coal preparation and mineral processing plants found at surface mine sites is described. The content for the audits was derived from diverse sources of information on ergonomics and safety deficiencies including: analysis of injury, illness and fatality data and reports; task analysis; empirical laboratory studies of particular tasks; field studies and observations at mine sites; and maintenance records. These diverse sources of information were utilised to establish construct validity of the modular audits that were developed for use by mine safety personnel. User and interrater reliability testing was carried out prior to finalising the audits. The audits can be implemented using downloadable paper versions or with a free mobile NIOSH-developed Android application called ErgoMine. Practitioner Summary: The methodology used to develop ergonomics audits for three types of mining operations is described. Various sources of audit content are compared and contrasted to serve as a guide for developing ergonomics audits for other occupational contexts.
1986-10-01
opeational test and evaluation (OT&R). The OT&B Is comprised of Initial operational test and evaluation ( IOT &R) and follow-on test and evaluation (FOT&R). OT&I...BP HYL FVAC beating, ventilation and air conditioning am. ICBM Intercntinental ballistic missile an. IOT &R Initial operational test and *valuation so...and maintenance vehicles (stop- B pod, engine idle-exterior), facility equipment utility rooms, heating, ventilation and air conditioning ( HVAC
14 CFR 91.407 - Operation after maintenance, preventive maintenance, rebuilding, or alteration.
Code of Federal Regulations, 2012 CFR
2012-01-01
... flies the aircraft, makes an operational check of the maintenance performed or alteration made, and logs... maintenance, preventive maintenance, rebuilding, or alteration. (a) No person may operate any aircraft that... 14 Aeronautics and Space 2 2012-01-01 2012-01-01 false Operation after maintenance, preventive...
14 CFR 91.407 - Operation after maintenance, preventive maintenance, rebuilding, or alteration.
Code of Federal Regulations, 2013 CFR
2013-01-01
... flies the aircraft, makes an operational check of the maintenance performed or alteration made, and logs... maintenance, preventive maintenance, rebuilding, or alteration. (a) No person may operate any aircraft that... 14 Aeronautics and Space 2 2013-01-01 2013-01-01 false Operation after maintenance, preventive...
14 CFR 91.407 - Operation after maintenance, preventive maintenance, rebuilding, or alteration.
Code of Federal Regulations, 2010 CFR
2010-01-01
... flies the aircraft, makes an operational check of the maintenance performed or alteration made, and logs... maintenance, preventive maintenance, rebuilding, or alteration. (a) No person may operate any aircraft that... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Operation after maintenance, preventive...
14 CFR 91.407 - Operation after maintenance, preventive maintenance, rebuilding, or alteration.
Code of Federal Regulations, 2011 CFR
2011-01-01
... flies the aircraft, makes an operational check of the maintenance performed or alteration made, and logs... maintenance, preventive maintenance, rebuilding, or alteration. (a) No person may operate any aircraft that... 14 Aeronautics and Space 2 2011-01-01 2011-01-01 false Operation after maintenance, preventive...
14 CFR 91.407 - Operation after maintenance, preventive maintenance, rebuilding, or alteration.
Code of Federal Regulations, 2014 CFR
2014-01-01
... flies the aircraft, makes an operational check of the maintenance performed or alteration made, and logs... maintenance, preventive maintenance, rebuilding, or alteration. (a) No person may operate any aircraft that... 14 Aeronautics and Space 2 2014-01-01 2014-01-01 false Operation after maintenance, preventive...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1980-10-01
The standard mass emission (Federal Test Procedure) was performed for determination of the effects of inspection and maintenance on a sample of passenger cars operating in the Houston area. This sample was also used for obtaining abbreviated emission test (short cycle test), fuel economy, and emission component system maladjustment and disablement and other data. Four-hundred eighty vehicles were inspected under the program: one-hundred from the 1980 model year, one-hundred 1979 vehicles, one-hundred 1978 vehicles, sixty 1977 vehicles, sixty 1976 vehicles and sixty from the 1975 model year. Both domestic and imported auto makes were examined. All vehicles which failed anmore » initial inspection, a total of 206 vehicles, were subject to a baseline and set of replicate test sequences comprised of the FTP, the 50 Cruise Test, the Highway Fuel Economy Test, the Loaded Two Mode Test and the Four Speed Idle Test. A prescribed maintenance step preceded each of the replicate sequences. Failed vehicles were further subject to an emission control system maladjustment/disablement and status inspection, driveability evaluations and owner-interviews to obtain vehicle maintenance and useage data.« less
40 CFR 63.1187 - What do I need to know about operations, maintenance, and monitoring plans?
Code of Federal Regulations, 2010 CFR
2010-07-01
... operations, maintenance, and monitoring plans? 63.1187 Section 63.1187 Protection of Environment... about operations, maintenance, and monitoring plans? (a) An operations, maintenance, and monitoring plan... title V permit. (b) The operations, maintenance, and monitoring plan must include the following: (1...
Code of Federal Regulations, 2010 CFR
2010-07-01
... 200 hours of operation from engine startup (engine burn-in period) are not violations. Rebuilt... units is limited to 100 hours per year. The owner or operator may petition the Administrator for... require maintenance and testing of emergency RICE beyond 100 hours per year. (4) You may operate your...
ERIC Educational Resources Information Center
Human Engineering Inst., Cleveland, OH.
THIS MODULE OF A 25-MODULE COURSE IS DESIGNED TO DEVELOP AN UNDERSTANDING OF THE OPERATION AND MAINTENANCE OF SPECIFIC MODELS OF AUTOMATIC TRANSMISSIONS USED ON DIESEL POWERED VEHICLES. TOPICS ARE (1) GENERAL SPECIFICATION DATA, (2) OPTIONS FOR VARIOUS APPLICATIONS, (3) ROAD TEST INSTRUCTIONS, (4) IDENTIFICATION AND SPECIFICATION DATA, (5) ALLISON…
Code of Federal Regulations, 2013 CFR
2013-01-01
... maintenance test flight with a second pilot or certificated mechanic, and no passengers or cargo are carried... are distributed by Turbine Aircraft Services, Inc. You may obtain a copy from Turbine Aircraft.... Supplementary NTS E. In Flight Post Maintenance Checks 1. NTS In-Flight 2. Flight Idle Fuel Flow F. Limitations...
Code of Federal Regulations, 2012 CFR
2012-01-01
... maintenance test flight with a second pilot or certificated mechanic, and no passengers or cargo are carried... are distributed by Turbine Aircraft Services, Inc. You may obtain a copy from Turbine Aircraft.... Supplementary NTS E. In Flight Post Maintenance Checks 1. NTS In-Flight 2. Flight Idle Fuel Flow F. Limitations...
Code of Federal Regulations, 2014 CFR
2014-01-01
... maintenance test flight with a second pilot or certificated mechanic, and no passengers or cargo are carried... are distributed by Turbine Aircraft Services, Inc. You may obtain a copy from Turbine Aircraft.... Supplementary NTS E. In Flight Post Maintenance Checks 1. NTS In-Flight 2. Flight Idle Fuel Flow F. Limitations...
Evaluation of the MAYDAY/9-1-1 field operational test
DOT National Transportation Integrated Search
2001-01-26
The primary purpose of this User Service document is to address the needs of the relevant stakeholders within the maintenance and construction operations community. Based on these needs, the MCO User Service further describes the services it should p...
Mod-2 wind turbine system development. Volume 1: Executive summary
NASA Technical Reports Server (NTRS)
1982-01-01
The development of the MOD-2 wind turbine through acceptance testing and initial operational evaluation is documented. Pitch control hydraulic system, yaw control system, drive train, electrical power station, control system, operations and maintenance experience, and availability are discussed.
Orbit transfer rocket engine technology program. Phase 2: Advanced engine study
NASA Technical Reports Server (NTRS)
Erickson, C.; Martinez, A.; Hines, B.
1987-01-01
In Phase 2 of the Advanced Engine Study, the Failure Modes and Effects Analysis (FMEA) maintenance-driven engine design, preliminary maintenance plan, and concept for space operable disconnects generated in Phase 1 were further developed. Based on the results of the vehicle contractors Orbit Transfer Vehicle (OTV) Concept Definition and System Analysis Phase A studies, minor revisions to the engine design were made. Additional refinements in the engine design were identified through further engine concept studies. These included an updated engine balance incorporating experimental heat transfer data from the Enhanced Heat Load Thrust Chamber Study and a Rao optimum nozzle contour. The preliminary maintenance plan of Phase 1 was further developed through additional studies. These included a compilation of critical component lives and life limiters and a review of the Space Shuttle Main Engine (SSME) operations and maintenance manual in order to begin outlining the overall maintenance procedures for the Orbit Transfer Vehicle Engine and identifying technology requirements for streamlining space-based operations. Phase 2 efforts also provided further definition to the advanced fluid coupling devices including the selection and preliminary design of a preferred concept and a preliminary test plan for its further development.
30 CFR 57.22103 - Open flames (I-A, II-A, III, and V-A mines).
Code of Federal Regulations, 2010 CFR
2010-07-01
... welding, cutting, and other maintenance operations, and for igniting underground retorts in a Subcategory... after the initital test has been conducted as an alternative to the ten-minute interval testing...
Ratnam, Sam; Jang, Dan; Gilchrist, Jodi; Smieja, Marek; Poirier, Andre; Hatchette, Todd; Flandin, Jean-Frederic; Chernesky, Max
2014-07-01
The choice of a suitable automated system for a diagnostic laboratory depends on various factors. Comparative workflow studies provide quantifiable and objective metrics to determine hands-on time during specimen handling and processing, reagent preparation, return visits and maintenance, and test turnaround time and throughput. Using objective time study techniques, workflow characteristics for processing 96 and 192 tests were determined on m2000 RealTime (Abbott Molecular), Viper XTR (Becton Dickinson), cobas 4800 (Roche Molecular Diagnostics), Tigris (Hologic Gen-Probe), and Panther (Hologic Gen-Probe) platforms using second-generation assays for Chlamydia trachomatis and Neisseria gonorrhoeae. A combination of operational and maintenance steps requiring manual labor showed that Panther had the shortest overall hands-on times and Viper XTR the longest. Both Panther and Tigris showed greater efficiency whether 96 or 192 tests were processed. Viper XTR and Panther had the shortest times to results and m2000 RealTime the longest. Sample preparation and loading time was the shortest for Panther and longest for cobas 4800. Mandatory return visits were required only for m2000 RealTime and cobas 4800 when 96 tests were processed, and both required substantially more hands-on time than the other systems due to increased numbers of return visits when 192 tests were processed. These results show that there are substantial differences in the amount of labor required to operate each system. Assay performance, instrumentation, testing capacity, workflow, maintenance, and reagent costs should be considered in choosing a system. Copyright © 2014, American Society for Microbiology. All Rights Reserved.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 33 Navigation and Navigable Waters 2 2012-07-01 2012-07-01 false Tests. 127.1407 Section 127.1407... Facilities Handling Liquefied Hazardous Gas Maintenance § 127.1407 Tests. (a) Each operator of a waterfront facility handling LHG shall conduct a static liquid-pressure test of the piping, hoses, and loading arms of...
Code of Federal Regulations, 2013 CFR
2013-07-01
... 33 Navigation and Navigable Waters 2 2013-07-01 2013-07-01 false Tests. 127.1407 Section 127.1407... Facilities Handling Liquefied Hazardous Gas Maintenance § 127.1407 Tests. (a) Each operator of a waterfront facility handling LHG shall conduct a static liquid-pressure test of the piping, hoses, and loading arms of...
Code of Federal Regulations, 2014 CFR
2014-07-01
... 33 Navigation and Navigable Waters 2 2014-07-01 2014-07-01 false Tests. 127.1407 Section 127.1407... Facilities Handling Liquefied Hazardous Gas Maintenance § 127.1407 Tests. (a) Each operator of a waterfront facility handling LHG shall conduct a static liquid-pressure test of the piping, hoses, and loading arms of...
Code of Federal Regulations, 2010 CFR
2010-07-01
... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Tests. 127.1407 Section 127.1407... Facilities Handling Liquefied Hazardous Gas Maintenance § 127.1407 Tests. (a) Each operator of a waterfront facility handling LHG shall conduct a static liquid-pressure test of the piping, hoses, and loading arms of...
Code of Federal Regulations, 2011 CFR
2011-07-01
... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false Tests. 127.1407 Section 127.1407... Facilities Handling Liquefied Hazardous Gas Maintenance § 127.1407 Tests. (a) Each operator of a waterfront facility handling LHG shall conduct a static liquid-pressure test of the piping, hoses, and loading arms of...
Image quality specification and maintenance for airborne SAR
NASA Astrophysics Data System (ADS)
Clinard, Mark S.
2004-08-01
Specification, verification, and maintenance of image quality over the lifecycle of an operational airborne SAR begin with the specification for the system itself. Verification of image quality-oriented specification compliance can be enhanced by including a specification requirement that a vendor provide appropriate imagery at the various phases of the system life cycle. The nature and content of the imagery appropriate for each stage of the process depends on the nature of the test, the economics of collection, and the availability of techniques to extract the desired information from the data. At the earliest lifecycle stages, Concept and Technology Development (CTD) and System Development and Demonstration (SDD), the test set could include simulated imagery to demonstrate the mathematical and engineering concepts being implemented thus allowing demonstration of compliance, in part, through simulation. For Initial Operational Test and Evaluation (IOT&E), imagery collected from precisely instrumented test ranges and targets of opportunity consisting of a priori or a posteriori ground-truthed cultural and natural features are of value to the analysis of product quality compliance. Regular monitoring of image quality is possible using operational imagery and automated metrics; more precise measurements can be performed with imagery of instrumented scenes, when available. A survey of image quality measurement techniques is presented along with a discussion of the challenges of managing an airborne SAR program with the scarce resources of time, money, and ground-truthed data. Recommendations are provided that should allow an improvement in the product quality specification and maintenance process with a minimal increase in resource demands on the customer, the vendor, the operational personnel, and the asset itself.
Flowmeter evaluation for on-orbit operations
NASA Technical Reports Server (NTRS)
Baird, R. S.
1988-01-01
Various flowmetering concepts were flow tested to characterize the relative capabilities and limitations for on-orbit fluid-transfer operations. Performance results and basic operating principles of each flowmetering concept tested are summarized, and basic considerations required to select the best flowmeter(s) for fluid system application are discussed. Concepts tested were clamp-on ultrasonic, area averaging ultrasonic, offset ultrasonic, coriolis mass, vortex shedding, universal venturi tube, turbine, bearingless turbine, turbine/turbine differential-pressure hybrid, dragbody, and dragbody/turbine hybrid flowmeters. Fluid system flowmeter selection considerations discussed are flowmeter performance, fluid operating conditions, systems operating environments, flowmeter packaging, flowmeter maintenance, and flowmeter technology. No one flowmetering concept tested was shown to be best for all on-orbit fluid systems.
13. VIEW OF EAST OPERATING GALLERY ALONG THE POSTMORTEM CELLS. ...
13. VIEW OF EAST OPERATING GALLERY ALONG THE POST-MORTEM CELLS. A NUMBER OF MANIPULATOR ARMS COVERED WITH PLASTIC ARE ON THE LEFT WALL. - Nevada Test Site, Engine Maintenance Assembly & Disassembly Facility, Area 25, Jackass Flats, Mercury, Nye County, NV
NASA Technical Reports Server (NTRS)
Romero, Raylund; Summers, Harold; Cronkhite, James
1996-01-01
The objective was to evaluate the feasibility of a state-of-the-art health and usage monitoring system (HUMS) to provide monitoring of critical mechanical systems on the helicopter, including motors, drive train, engines, and life-limited components. The implementation of HUMS and cost integration with current maintenance procedures was assessed from the operator's viewpoint in order to achieve expected benefits from these systems, such as enhanced safety, reduced maintenance cost, and increased availability. An operational HUMS that was installed and operated under an independent flight trial program was used as a basis for this study. The HUMS equipment and software were commercially available. Based on the results of the feasibility study, the HUMS used in the flight trial program generally demonstrated a high level of reliability in monitoring the rotor system, engines, drive train, and life-limited components. The system acted as a sentinel to warn of impending failures. A worn tail rotor pitch bearing was detected by HUMS, which had the capability for self testing to diagnose system and sensor faults. Examples of potential payback to the operator with HUMS were identified, including reduced insurance cost through enhanced safety, lower operating costs derived from maintenance credits, increased aircraft availability, and improved operating efficiency. The interfacing of HUMS with current operational procedures was assessed to require only minimal revisions to the operator's maintenance manuals. Finally the success in realizing the potential benefits from HUMS technology was found to depend on the operator, helicopter manufacturer, regulator (FAA), and HUMS supplier working together.
48 CFR 52.222-2 - Payment for Overtime Premiums.
Code of Federal Regulations, 2010 CFR
2010-10-01
... in connection with administration, protection, transportation, maintenance, standby plant protection, operation of utilities, or accounting; (3) To perform tests, industrial processes, laboratory procedures...
40 CFR 86.1908 - How must I select and screen my in-use engines?
Code of Federal Regulations, 2014 CFR
2014-07-01
... an illuminated MIL or stored OBD trouble code that lead you to reject the vehicle from the test... maintenance and use history you obtain from the owner or operator, as required by § 86.1925. You must report the engine's maintenance and use history and information related to the OBD system, as described in...
The 3.5-Meter Telescope Enclosure
1994-04-01
and acoustic vibrations, and the enclosure cannot be stopped quickly in an emergency. Also, the work of Zago indicates that open-air operation of the...enclosure. This capability is useful during operational testing and maintenance of the telescope. ’ Zago , L., "Design and Performance of Large
Vibrational impacts of hush house operation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Witten, A.J.
1988-01-01
United States Air Force (USAF) facilities are required to test turboprop and turbojet engines before or after maintenance or repair and prior to installation on aircraft to ensure that no problems were introduced or remain uncorrected. This requirement prevents the installation of engines in aircraft which require further maintenance. There are a number of facilities in use by USAF for conducting engine diagnostic tests. The most modern of these facilities is the hush house which is a hangar-like structure designed to isolate the noise associated with extended engine operations from the surrounding environment. One type of hush house, the T-10,more » is of particular concern because of vibrational impacts to surrounding structures induced by subaudible sound (infrasound) emitted during operation. While these facilities fulfill the design requirement of reducing audible noise, serious siting problems have been reported at several installations because of infrasound-induced vibrations. The worst of these include the abandonment of an avionics laboratory because induced vibrations interfered with this facilities function and structural damage to a concrete block maintenance facility. This paper describes a predictive method for assessing vibration-driven structural impacts. 9 refs., 2 figs.« less
49 CFR 236.586 - Daily or after trip test.
Code of Federal Regulations, 2011 CFR
2011-10-01
..., MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Inspection and Tests; Locomotive § 236.586 Daily or after trip test..., each locomotive equipped with an automatic cab signal or train stop or train control device operating...
49 CFR 236.586 - Daily or after trip test.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Inspection and Tests; Locomotive § 236.586 Daily or after trip test..., each locomotive equipped with an automatic cab signal or train stop or train control device operating...
Code of Federal Regulations, 2013 CFR
2013-10-01
... shall identify classroom and field courses, lectures, tests, and other educational or instructional... shall identify the post-accident toxicological testing, reasonable cause testing, and random alcohol and... and maintenance, and any planned amendments or modifications to capital improvement and research and...
Code of Federal Regulations, 2014 CFR
2014-10-01
... shall identify classroom and field courses, lectures, tests, and other educational or instructional... shall identify the post-accident toxicological testing, reasonable cause testing, and random alcohol and... and maintenance, and any planned amendments or modifications to capital improvement and research and...
Code of Federal Regulations, 2012 CFR
2012-10-01
... shall identify classroom and field courses, lectures, tests, and other educational or instructional... shall identify the post-accident toxicological testing, reasonable cause testing, and random alcohol and... and maintenance, and any planned amendments or modifications to capital improvement and research and...
Code of Federal Regulations, 2011 CFR
2011-10-01
... shall identify classroom and field courses, lectures, tests, and other educational or instructional... shall identify the post-accident toxicological testing, reasonable cause testing, and random alcohol and... and maintenance, and any planned amendments or modifications to capital improvement and research and...
17. Photocopy of photograph. VIEW OF WORKERS IN EAST OPERATING ...
17. Photocopy of photograph. VIEW OF WORKERS IN EAST OPERATING GALLERY USING MANIPULATOR ARMS AT STATION E-108. Photographer unknown, ca. 1965, original photograph and negative on file at the Remote Sensing Laboratory, Department of Energy, Nevada Operations Office. - Nevada Test Site, Engine Maintenance Assembly & Disassembly Facility, Area 25, Jackass Flats, Mercury, Nye County, NV
Facultative Lagoons. Instructor's Guide. Biological Treatment Process Control.
ERIC Educational Resources Information Center
Andersen, Lorri
This instructor's guide contains materials needed to teach a two-lesson unit on the structure and components of facultative lagoons, the biological theory of their operation, and factors affecting their operation. Control testing recommendations, maintenance guidelines, and troubleshooting hints are also provided. These materials include: (1) an…
Digital electronic engine control history
NASA Technical Reports Server (NTRS)
Putnam, T. W.
1984-01-01
Full authority digital electronic engine controls (DEECs) were studied, developed, and ground tested because of projected benefits in operability, improved performance, reduced maintenance, improved reliability, and lower life cycle costs. The issues of operability and improved performance, however, are assessed in a flight test program. The DEEC on a F100 engine in an F-15 aircraft was demonstrated and evaluated. The events leading to the flight test program are chronicled and important management and technical results are identified.
NASA Astrophysics Data System (ADS)
Schoess, Jeffrey N.; Seifert, Greg; Paul, Clare A.
1996-05-01
The smart aircraft fastener evaluation (SAFE) system is an advanced structural health monitoring effort to detect and characterize corrosion in hidden and inaccessible locations of aircraft structures. Hidden corrosion is the number one logistics problem for the U.S. Air Force, with an estimated maintenance cost of $700M per year in 1990 dollars. The SAFE system incorporates a solid-state electrochemical microsensor and smart sensor electronics in the body of a Hi-Lok aircraft fastener to process and autonomously report corrosion status to aircraft maintenance personnel. The long-term payoff for using SAFE technology will be in predictive maintenance for aging aircraft and rotorcraft systems, fugitive emissions applications such as control valves, chemical pipeline vessels, and industrial boilers. Predictive maintenance capability, service, and repair will replace the current practice of scheduled maintenance to substantially reduce operational costs. A summary of the SAFE concept, laboratory test results, and future field test plans is presented.
Travel Information, Transportation & Public Facilities, State of Alaska
outside site Report Potholes Road Conditions (511) Road Maintenance Central Region Maintenance & ; Operations Northern Region Maintenance & Operations Southcoast Region Maintenance & Operations Road Weather Information System Street Sweeping - Anchorage & Eagle River Winter Road Maintenance Priority
14 CFR 121.374 - Continuous airworthiness maintenance program (CAMP) for two-engine ETOPS.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Continuous airworthiness maintenance...: CERTIFICATION AND OPERATIONS OPERATING REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Maintenance, Preventive Maintenance, and Alterations § 121.374 Continuous airworthiness maintenance program (CAMP) for two...
14 CFR 121.374 - Continuous airworthiness maintenance program (CAMP) for two-engine ETOPS.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Continuous airworthiness maintenance...: CERTIFICATION AND OPERATIONS OPERATING REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Maintenance, Preventive Maintenance, and Alterations § 121.374 Continuous airworthiness maintenance program (CAMP) for two...
14 CFR 121.374 - Continuous airworthiness maintenance program (CAMP) for two-engine ETOPS.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Continuous airworthiness maintenance...: CERTIFICATION AND OPERATIONS OPERATING REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Maintenance, Preventive Maintenance, and Alterations § 121.374 Continuous airworthiness maintenance program (CAMP) for two...
14 CFR 121.374 - Continuous airworthiness maintenance program (CAMP) for two-engine ETOPS.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Continuous airworthiness maintenance...: CERTIFICATION AND OPERATIONS OPERATING REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Maintenance, Preventive Maintenance, and Alterations § 121.374 Continuous airworthiness maintenance program (CAMP) for two...
14 CFR 121.374 - Continuous airworthiness maintenance program (CAMP) for two-engine ETOPS.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Continuous airworthiness maintenance...: CERTIFICATION AND OPERATIONS OPERATING REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Maintenance, Preventive Maintenance, and Alterations § 121.374 Continuous airworthiness maintenance program (CAMP) for two...
7 CFR 654.20 - Violations of operation and maintenance agreement.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 6 2010-01-01 2010-01-01 false Violations of operation and maintenance agreement. 654... RESOURCES CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES OPERATION AND MAINTENANCE Federal Financially-Assisted Projects § 654.20 Violations of operation and maintenance agreement. (a) The...
1981-11-01
evaluate and test these ideas in the Internet research context. 4. Field third-generation gateways. At this point in time, we purposely avoid selecting a...plan to cover the period from now until the time when a gateway system can be fielded which implements the results of the current work in the Internet ... research community. The current gateway system is inadequate from both a functionality and a• performance standpoint, and therefore the transition
Extremely Low Frequency-Magnetic Field (ELF-MF) Exposure Characteristics among Semiconductor Workers
Choi, Sangjun; Cha, Wonseok; Kim, Won; Yoon, Chungsik; Park, Ju-Hyun; Ha, Kwonchul; Park, Donguk
2018-01-01
We assessed the exposure of semiconductor workers to extremely low frequency-magnetic fields (ELF-MF) and identified job characteristics affecting ELF-MF exposure. These were demonstrated by assessing the exposure of 117 workers involved in wafer fabrication (fab) and chip packaging wearing personal dosimeters for a full shift. A portable device was used to monitor ELF-MF in high temporal resolution. All measurements were categorized by operation, job and working activity during working time. ELF-MF exposure of workers were classified based on the quartiles of ELF-MF distribution. The average levels of ELF-MF exposure were 0.56 µT for fab workers, 0.59 µT for chip packaging workers and 0.89 µT for electrical engineers, respectively. Exposure to ELF-MF differed among types of factory, operation, job and activity. Workers engaged in the diffusion and chip testing activities showed the highest ELF-MF exposure. The ELF-MF exposures of process operators were found to be higher than those of maintenance engineers, although peak exposure and/or patterns varied. The groups with the highest quartile ELF-MF exposure level are operators in diffusion, ion implantation, module and testing operations, and maintenance engineers in diffusion, module and testing operations. In conclusion, ELF-MF exposure among workers can be substantially affected by the type of operation and job, and the activity or location. PMID:29614730
30 CFR 75.1914 - Maintenance of diesel-powered equipment.
Code of Federal Regulations, 2010 CFR
2010-07-01
... written standard operating procedures for such testing and evaluation that specify the following: (1) The... MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Diesel-Powered Equipment § 75... the equipment is operated. (d) The intake air filter on diesel-powered equipment shall be replaced or...
30 CFR 75.1914 - Maintenance of diesel-powered equipment.
Code of Federal Regulations, 2012 CFR
2012-07-01
... written standard operating procedures for such testing and evaluation that specify the following: (1) The... MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Diesel-Powered Equipment § 75... the equipment is operated. (d) The intake air filter on diesel-powered equipment shall be replaced or...
30 CFR 75.1914 - Maintenance of diesel-powered equipment.
Code of Federal Regulations, 2013 CFR
2013-07-01
... written standard operating procedures for such testing and evaluation that specify the following: (1) The... MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Diesel-Powered Equipment § 75... the equipment is operated. (d) The intake air filter on diesel-powered equipment shall be replaced or...
30 CFR 75.1914 - Maintenance of diesel-powered equipment.
Code of Federal Regulations, 2011 CFR
2011-07-01
... written standard operating procedures for such testing and evaluation that specify the following: (1) The... MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Diesel-Powered Equipment § 75... the equipment is operated. (d) The intake air filter on diesel-powered equipment shall be replaced or...
30 CFR 75.1914 - Maintenance of diesel-powered equipment.
Code of Federal Regulations, 2014 CFR
2014-07-01
... written standard operating procedures for such testing and evaluation that specify the following: (1) The... MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Diesel-Powered Equipment § 75... the equipment is operated. (d) The intake air filter on diesel-powered equipment shall be replaced or...
Study of emissions from passenger cars in six cities, FY79. Volume I. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1980-10-01
The standard mass emission test (Federal Test Procedure) was performed for emission factors determination on samples of passenger cars operating in Los Angeles, Houston, Denver, Phoenix, St. Louis and Washington, DC. These samples were also used for obtaining abbreviated emission test (short cycle test), fuel economy test, emission related maintenance and other data. Two-thousand forty-two (2,042) vehicles were tested under the program. The FTP and the Highway Fuel Economy Test were performed on all vehicles at all sites. Some vehicles which exceed Federal standards (excluding the Houston site) were subjected to a restorative maintenance evaluation. The evaluation employed in Losmore » Angeles was designed to address three-way catalyst technology. Some vehicles in all but the Los Angeles site were used to evaluate commercial repair facility performance in relation to idle speed and mixture adjustments. Other actions were taken in relation to each vehicle tested. These included an emission control system maladjustment/disablement and status inspection driveability evaluations and owner interviews to obtain vehicle maintenance and usage data.« less
Automated Iodine Monitoring System Development (AIMS). [shuttle prototype
NASA Technical Reports Server (NTRS)
1975-01-01
The operating principle of the automated iodine monitoring/controller system (AIMS) is described along with several design modifications. The iodine addition system is also discussed along with test setups and calibration; a facsimile of the optical/mechanical portion of the iodine monitor was fabricated and tested. The appendices include information on shuttle prototype AIMS, preliminary prime item development specifications, preliminary failure modes and effects analysis, and preliminary operating and maintenance instructions.
Space shuttle maintenance program planning document
NASA Technical Reports Server (NTRS)
Brown, D. V.
1972-01-01
A means for developing a space shuttle maintenance program which will be acceptable to the development centers, the operators (KSC and AF), and the manufacturer is presented. The general organization and decision processes for determining the essential scheduled maintenance requirements for the space shuttle orbiter are outlined. The development of initial scheduled maintenance programs is discussed. The remaining maintenance, that is non-scheduled or non-routine maintenance, is directed by the findings of the scheduled maintenance program and the normal operation of the shuttle. The remaining maintenance consists of maintenance actions to correct discrepancies noted during scheduled maintenance tasks, nonscheduled maintenance, normal operation, or condition monitoring.
EOS/AMSU: A Blackbody Spacecraft Test Targets Operation and Maintenance Manual
NASA Technical Reports Server (NTRS)
1998-01-01
This report describes the spacecraft test targets and readout console as described in section 5.3.3 of the performance specification S-480-80. The spacecraft targets are to be used to provide a well-known radiometric reference for testing the functionality of the AMSU-A instruments at the spacecraft contractor's facility.
Code of Federal Regulations, 2010 CFR
2010-07-01
... compliance with the operation and maintenance requirements that apply to me? 63.9636 Section 63.9636....9636 How do I demonstrate continuous compliance with the operation and maintenance requirements that... demonstrate continuous compliance with the operation and maintenance requirements in § 63.9600(b) by...
Code of Federal Regulations, 2011 CFR
2011-10-01
... operators of roadway maintenance machines. 214.355 Section 214.355 Transportation Other Regulations Relating... operators of roadway maintenance machines. (a) The training and qualification of roadway workers who operate roadway maintenance machines shall include, as a minimum: (1) Procedures to prevent a person from being...
Code of Federal Regulations, 2010 CFR
2010-10-01
... operators of roadway maintenance machines. 214.355 Section 214.355 Transportation Other Regulations Relating... operators of roadway maintenance machines. (a) The training and qualification of roadway workers who operate roadway maintenance machines shall include, as a minimum: (1) Procedures to prevent a person from being...
29 CFR 4.130 - Types of covered service contracts illustrated.
Code of Federal Regulations, 2012 CFR
2012-07-01
... services. (8) Chemical testing and analysis. (9) Clothing alteration and repair. (10) Computer services... maintenance and operation and engineering support services. (16) Exploratory drilling (other than part of...
29 CFR 4.130 - Types of covered service contracts illustrated.
Code of Federal Regulations, 2011 CFR
2011-07-01
... services. (8) Chemical testing and analysis. (9) Clothing alteration and repair. (10) Computer services... maintenance and operation and engineering support services. (16) Exploratory drilling (other than part of...
Sensor Measurement Strategies for Monitoring Offshore Wind and Wave Energy Devices
NASA Astrophysics Data System (ADS)
O'Donnell, Deirdre; Srbinovsky, Bruno; Murphy, Jimmy; Popovici, Emanuel; Pakrashi, Vikram
2015-07-01
While the potential of offshore wind and wave energy devices is well established and accepted, operations and maintenance issues are still not very well researched or understood. In this regard, scaled model testing has gained popularity over time for such devices at various technological readiness levels. The dynamic response of these devices are typically measured by different instruments during such scaled tests but agreed sensor choice, measurement and placement guidelines are still not in place. This paper compared the dynamic responses of some of these sensors from a scaled ocean wave testing to highlight the importance of sensor measurement strategies. The possibility of using multiple, cheaper sensors of seemingly inferior performance as opposed to the deployment of a small number of expensive and accurate sensors are also explored. An energy aware adaptive sampling theory is applied to highlight the possibility of more efficient computing when large volumes of data are available from the tested structures. Efficient sensor measurement strategies are expected to have a positive impact on the development of an device at different technological readiness levels while it is expected to be helpful in reducing operation and maintenance costs if such an approach is considered for the devices when they are in operation.
NASA Astrophysics Data System (ADS)
Milana; Khan, M. K.; Munive, J. E.
2014-07-01
The importance of maintenance has escalated significantly by the increasing of automation in manufacturing process. This condition switches traditional maintenance perspective of inevitable cost into the business competitive driver. Consequently, maintenance strategy and operation decision needs to be synchronized to business and manufacturing concerns. This paper shows the development of conceptual design of Knowledge Based System for Integrated Maintenance Strategy and Operation (KBIMSO). The framework of KBIMSO is elaborated to show the process of how the KBIMSO works to reach the maintenance decision. By considering the multi-criteria of maintenance decision making, the KB system embedded with GAP and AHP to support integrated maintenance strategy and operation which is novel in this area. The KBIMSO is useful to review the existing maintenance system and give reasonable recommendation of maintenance decisions in respect to business and manufacturing perspective.
49 CFR 192.605 - Procedural manual for operations, maintenance, and emergencies.
Code of Federal Regulations, 2010 CFR
2010-10-01
... operations and maintenance activities are conducted. (b) Maintenance and normal operations. The manual... personnel to determine the effectiveness, and adequacy of the procedures used in normal operation and... or flow rate outside normal operating limits; (iii) Loss of communications; (iv) Operation of any...
Code of Federal Regulations, 2010 CFR
2010-07-01
... to maintain torches in a safe operating condition. (d) Tests for leaks on the hose valves or gages of liquefied and nonliquefied compressed gas cylinders shall only be made with a soft brush and soapy water or...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Harris, S.; Gross, R.; Goble, W
The safety integrity level (SIL) of equipment used in safety instrumented functions is determined by the average probability of failure on demand (PFDavg) computed at the time of periodic inspection and maintenance, i.e., the time of proof testing. The computation of PFDavg is generally based solely on predictions or estimates of the assumed constant failure rate of the equipment. However, PFDavg is also affected by maintenance actions (or lack thereof) taken by the end user. This paper shows how maintenance actions can affect the PFDavg of spring operated pressure relief valves (SOPRV) and how these maintenance actions may be accountedmore » for in the computation of the PFDavg metric. The method provides a means for quantifying the effects of changes in maintenance practices and shows how these changes impact plant safety.« less
Maintenance & construction operations user service : an addendum to the ITS program plan
DOT National Transportation Integrated Search
2001-01-26
The Maintenance and Construction Operations User Service describes the need for integrating key activities. Generally, key Maintenance and Construction Operations (MCO) activities include monitoring, operating, maintaining, improving, and managing th...
Inverter performance comparison at PVUSA
NASA Astrophysics Data System (ADS)
Farmer, Brian K.; Stolte, Walter J.; Reyes, Antonio B.
1996-01-01
The paper is a summary of the Photovoltaics for Utility Scale Applications (PVUSA) Project's experience with procurement, testing, operation and maintenance of photovoltaic (PV) power conditioning units (PCUs) at the PVUSA Davis and Kerman sites. Brief descriptions of each of five different PCU models are included to explain tests and operational characteristics. A comparison of the PCUs' performances is presented, and conclusions are offered. Further details are in a forthcoming PVUSA report on PCUs and Power Quality [1].
40 CFR 35.2206 - Operation and maintenance.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Section 35.2206 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL... operation and maintenance manual. (2) In projects where a component is placed in operation before completion... project until a final operation and maintenance manual for the operating component is furnished and...
Small Engines Care, Operation, Maintenance and Repair. Volume I.
ERIC Educational Resources Information Center
Turner, J. Howard
Developed by teacher educators and agricultural engineers and tested by vocational agriculture teachers, this reference is for student and teacher use as part of a course on servicing and operating an engine. Content includes: (1) Distinguishing Features of Small Engines, (2) How Small Gasoline Engines Work, (3) Comparing 4-(Stroke)Cycle and…
Code of Federal Regulations, 2010 CFR
2010-10-01
... with a unique identification number and maximum working pressure. (c) Post-delivery hose check. After... during the unloading. (d) Monthly inspections and tests. (1) The operator must visually inspect each... operator must actuate all emergency discharge control devices designed to close the internal self-closing...
Code of Federal Regulations, 2014 CFR
2014-07-01
... procedures in the plan. (2) You have certified in your performance test report that the system operated... EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Iron and Steel Foundries Initial Compliance Requirements § 63...
Code of Federal Regulations, 2011 CFR
2011-07-01
... procedures in the plan. (2) You have certified in your performance test report that the system operated... EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Iron and Steel Foundries Initial Compliance Requirements § 63...
Code of Federal Regulations, 2010 CFR
2010-07-01
... procedures in the plan. (2) You have certified in your performance test report that the system operated... EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Iron and Steel Foundries Initial Compliance Requirements § 63...
7 CFR 1470.23 - Conservation activity operation and maintenance.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 10 2010-01-01 2010-01-01 false Conservation activity operation and maintenance. 1470... STEWARDSHIP PROGRAM Contracts and Payments § 1470.23 Conservation activity operation and maintenance. The participant will operate and maintain existing conservation activities on the agricultural operation to at...
Verification System: First System-Wide Performance Test
NASA Astrophysics Data System (ADS)
Chernobay, I.; Zerbo, L.
2006-05-01
System-wide performance tests are essential for the development, testing and evaluation of individual components of the verification system. In addition to evaluating global readiness it helps establishing the practical and financial requirements for eventual operations. The first system-wide performance test (SPT1) was conducted in three phases: - A preparatory phase in May-June 2004 - A performance testing phase in April-June 2005 - An evaluation phase in the last half of 2005. The preparatory phase was developmental in nature. The main objectives for the performance testing phase included establishment of performance baseline under current provisional mode of operation (CTBT/PC- 19/1/Annex II, CTBT/WGB-21/1), examination of established requirements and procedures for operation and maintenance. To establish a system-wide performance baseline the system configuration was fixed for April-May 2005. The third month (June 2005) was used for implementation of 21 test case scenarios to examine either particular operational procedures or the response of the system components to the failures simulated under controlled conditions. A total of 163 stations and 5 certified radionuclide laboratories of International Monitoring System (IMS) participated in the performance testing phase - about 50% of the eventual IMS network. 156 IMS facilities and 40 National Data Centres (NDCs) were connected to the International Data Centre (IDC) via Global Communication Infrastructure (GCI) communication links. In addition, 12 legacy stations in the auxiliary seismic network sent data to the IDC over the Internet. During the performance testing phase, the IDC produced all required products, analysed more than 6100 seismic events and 1700 radionuclide spectra. Performance of all system elements was documented and analysed. IDC products were compared with results of data processing at the NDCs. On the basis of statistics and information collected during the SPT1 a system-wide performance baseline under current guidelines for provisional Operation and Maintenance was established. The test provided feedback for further development of the draft IMS and IDC Operational Manuals and identified priority areas for further system development.
40 CFR 63.5998 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2010 CFR
2010-07-01
... POLLUTANTS FOR SOURCE CATEGORIES National Emissions Standards for Hazardous Air Pollutants: Rubber Tire Manufacturing Testing and Initial Compliance Requirements for Tire Cord Production Affected Sources § 63.5998...
Code of Federal Regulations, 2011 CFR
2011-07-01
... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CHEMICAL... testing procedures shall follow recognized and generally accepted good engineering practices. The...' recommendations, industry standards or codes, good engineering practices, and prior operating experience. ...
Code of Federal Regulations, 2010 CFR
2010-07-01
... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CHEMICAL... testing procedures shall follow recognized and generally accepted good engineering practices. The...' recommendations, industry standards or codes, good engineering practices, and prior operating experience. ...
Code of Federal Regulations, 2012 CFR
2012-07-01
... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CHEMICAL... testing procedures shall follow recognized and generally accepted good engineering practices. The...' recommendations, industry standards or codes, good engineering practices, and prior operating experience. ...
Code of Federal Regulations, 2014 CFR
2014-07-01
... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CHEMICAL... testing procedures shall follow recognized and generally accepted good engineering practices. The...' recommendations, industry standards or codes, good engineering practices, and prior operating experience. ...
Code of Federal Regulations, 2013 CFR
2013-07-01
... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CHEMICAL... testing procedures shall follow recognized and generally accepted good engineering practices. The...' recommendations, industry standards or codes, good engineering practices, and prior operating experience. ...
Ice pack heat sink subsystem - phase 1, volume 2
NASA Technical Reports Server (NTRS)
Roebelen, G. J., Jr.
1973-01-01
The design, development, and test of a functional laboratory model ice pack heat sink subsystem are discussed. Operating instructions to include mechanical and electrical schematics, maintenance instructions, and equipment specifications are presented.
MSFC Respiratory Protection Services
NASA Technical Reports Server (NTRS)
CoVan, James P.
1999-01-01
An overview of the Marshall Space Flight Center Respiratory Protection program is provided in this poster display. Respiratory protection personnel, building, facilities, equipment, customers, maintenance and operational activities, and Dynatech fit testing details are described and illustrated.
Organizational Analysis of the United States Army Evaluation Center
2014-12-01
analysis of qualitative or quantitative data obtained from design reviews, hardware inspections, M&S, hardware and software testing , metrics review... Research Development Test & Evaluation (RDT&E) appropriation account. The Defense Acquisition Portal ACQuipedia website describes RDT&E as “ one of the... research , design , development, test and evaluation, production, installation, operation, and maintenance; data collection; processing and analysis
NASA Technical Reports Server (NTRS)
1980-01-01
Information concerning the installation, operation, and maintenance of the pyramidal Solar System for space heating and domestic hot water is presented. Principles of operation, sequence of installation, and procedures for the operation and maintenance of each subsystem making up the solar system are presented. Troubleshooting charts and maintenance schedules are presented.
NASA Astrophysics Data System (ADS)
1980-09-01
Information concerning the installation, operation, and maintenance of the pyramidal Solar System for space heating and domestic hot water is presented. Principles of operation, sequence of installation, and procedures for the operation and maintenance of each subsystem making up the solar system are presented. Troubleshooting charts and maintenance schedules are presented.
46 CFR 107.259 - Crane inspection and testing.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Crane inspection and testing. 107.259 Section 107.259 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS....I.) Recommended Practice for Operation and Maintenance of Offshore Cranes, API RP 2D, First Edition...
46 CFR 107.259 - Crane inspection and testing.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Crane inspection and testing. 107.259 Section 107.259 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS....I.) Recommended Practice for Operation and Maintenance of Offshore Cranes, API RP 2D, First Edition...
46 CFR 107.259 - Crane inspection and testing.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Crane inspection and testing. 107.259 Section 107.259 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS....I.) Recommended Practice for Operation and Maintenance of Offshore Cranes, API RP 2D, First Edition...
46 CFR 107.259 - Crane inspection and testing.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Crane inspection and testing. 107.259 Section 107.259 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS....I.) Recommended Practice for Operation and Maintenance of Offshore Cranes, API RP 2D, First Edition...
46 CFR 107.259 - Crane inspection and testing.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Crane inspection and testing. 107.259 Section 107.259 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS....I.) Recommended Practice for Operation and Maintenance of Offshore Cranes, API RP 2D, First Edition...
49 CFR 234.269 - Cut-out circuits.
Code of Federal Regulations, 2013 CFR
2013-10-01
... EMERGENCY NOTIFICATION SYSTEMS Maintenance, Inspection, and Testing Inspections and Tests § 234.269 Cut-out... overrides the operation of automatic warning systems. This includes both switch cut-out circuits and devices... 49 Transportation 4 2013-10-01 2013-10-01 false Cut-out circuits. 234.269 Section 234.269...
49 CFR 234.269 - Cut-out circuits.
Code of Federal Regulations, 2014 CFR
2014-10-01
... EMERGENCY NOTIFICATION SYSTEMS Maintenance, Inspection, and Testing Inspections and Tests § 234.269 Cut-out... overrides the operation of automatic warning systems. This includes both switch cut-out circuits and devices... 49 Transportation 4 2014-10-01 2014-10-01 false Cut-out circuits. 234.269 Section 234.269...
49 CFR 234.269 - Cut-out circuits.
Code of Federal Regulations, 2012 CFR
2012-10-01
... EMERGENCY NOTIFICATION SYSTEMS Maintenance, Inspection, and Testing Inspections and Tests § 234.269 Cut-out... overrides the operation of automatic warning systems. This includes both switch cut-out circuits and devices... 49 Transportation 4 2012-10-01 2012-10-01 false Cut-out circuits. 234.269 Section 234.269...
Radon Measurement in Schools: Self-Paced Training Workbook.
ERIC Educational Resources Information Center
Institute for Disability Research and Training, Inc., Silver Spring, MD.
This workbook is designed to educate school personnel in randon detection. The workbook is intended for an audience of school officials, including administrators, business officers, facility managers, and maintenance and operations staff. It is meant to provide trainees with experience in planning a radon test, interpreting test results,…
14 CFR 147.31 - Attendance and enrollment, tests, and credit for prior instruction or experience.
Code of Federal Regulations, 2010 CFR
2010-01-01
... accredited vocational, technical, trade or high school; (iii) A military technical school; (iv) A... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) SCHOOLS AND OTHER CERTIFICATED AGENCIES AVIATION MAINTENANCE TECHNICIAN SCHOOLS Operating Rules § 147.31 Attendance and enrollment, tests, and credit for prior...
Operations and maintenance plan : Dallas Integrated Corridor Management (ICM) demonstration project.
DOT National Transportation Integrated Search
2014-01-01
This Operations and Maintenance (O&M) Plan describes how the Integrated Corridor Management System (ICMS) will be used in daily transportation operations and maintenance activities. The Plan addresses the activities needed to effectively operate the ...
7 CFR 1730.22 - Borrower analysis.
Code of Federal Regulations, 2011 CFR
2011-01-01
... which could indicate deterioration in the physical or cyber condition or the operational effectiveness of the system or suggest a need for changes in security, operations or maintenance policies... AGRICULTURE ELECTRIC SYSTEM OPERATIONS AND MAINTENANCE Operations and Maintenance Requirements § 1730.22...
7 CFR 1730.22 - Borrower analysis.
Code of Federal Regulations, 2012 CFR
2012-01-01
... which could indicate deterioration in the physical or cyber condition or the operational effectiveness of the system or suggest a need for changes in security, operations or maintenance policies... AGRICULTURE ELECTRIC SYSTEM OPERATIONS AND MAINTENANCE Operations and Maintenance Requirements § 1730.22...
7 CFR 1730.22 - Borrower analysis.
Code of Federal Regulations, 2013 CFR
2013-01-01
... which could indicate deterioration in the physical or cyber condition or the operational effectiveness of the system or suggest a need for changes in security, operations or maintenance policies... AGRICULTURE ELECTRIC SYSTEM OPERATIONS AND MAINTENANCE Operations and Maintenance Requirements § 1730.22...
7 CFR 1730.22 - Borrower analysis.
Code of Federal Regulations, 2014 CFR
2014-01-01
... which could indicate deterioration in the physical or cyber condition or the operational effectiveness of the system or suggest a need for changes in security, operations or maintenance policies... AGRICULTURE ELECTRIC SYSTEM OPERATIONS AND MAINTENANCE Operations and Maintenance Requirements § 1730.22...
40 CFR 280.31 - Operation and maintenance of corrosion protection.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 27 2014-07-01 2014-07-01 false Operation and maintenance of corrosion... UNDERGROUND STORAGE TANKS (UST) General Operating Requirements § 280.31 Operation and maintenance of corrosion protection. All owners and operators of steel UST systems with corrosion protection must comply with the...
40 CFR 280.31 - Operation and maintenance of corrosion protection.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 28 2012-07-01 2012-07-01 false Operation and maintenance of corrosion... UNDERGROUND STORAGE TANKS (UST) General Operating Requirements § 280.31 Operation and maintenance of corrosion protection. All owners and operators of steel UST systems with corrosion protection must comply with the...
40 CFR 280.31 - Operation and maintenance of corrosion protection.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 28 2013-07-01 2013-07-01 false Operation and maintenance of corrosion... UNDERGROUND STORAGE TANKS (UST) General Operating Requirements § 280.31 Operation and maintenance of corrosion protection. All owners and operators of steel UST systems with corrosion protection must comply with the...
Military Publications, Index of Test Operations Procedures
1981-10-01
AND RECORDING EQUIPMENT B033862L VOL X ELECTRONIC TEST EQUIPMENT BO33863L VOL XI MAINTENANCE OF ARMY AIRCRAFT; OPERATORS AND CREWMEMBERS MANUALS ...SYSTEMS 718646 6 JUN 68 6-2-186 (L) METEOROLOGICAL EQUIPMENT; METEOROLOGICAL STATIONS, MANUAL OR AUTOMATIC 870954 20 MAR 70 6-2-189 (L) METEOROLOGICAL...69 6-2-250 (L) RELAYS, RADIO 718622 16 APR 69 6-2-262 (L) SUPPRESSORS, VOLTAGE TRANSIENT 720578 MAR 67 6-2-265 (L) SWITCHBOARDS, MANUAL 718647 1 DEC
Lumen and Chromaticity Maintenance of LED PAR38 Lamps Operated in Steady-State Conditions
DOE Office of Scientific and Technical Information (OSTI.GOV)
Royer, Michael P.
2014-12-01
The lumen depreciation and color shift of 38 different lamps (32 LED, 2 CFL, 1 ceramic metal halide [CMH], 3 halogen) were monitored in a specially developed automated long-term test apparatus (ALTA2) for nearly 14,000 hours. Five samples of each lamp model were tested, with measurements recorded on a weekly basis. The lamps were operated continuously at a target ambient temperature between 44°C and 45°C.
Particular bi-fuel application of spark ignition engines
NASA Astrophysics Data System (ADS)
Raţiu, S.; Alexa, V.; Kiss, I.
2016-02-01
This paper presents a comparative test concerning the operation of a spark-ignition engine, make: Dacia 1300, model: 810.99, fuelled alternatively with gasoline and LPG (Liquefied Petroleum Gas). The tests carried out show, on the one hand, the maintenance of power and torque performances in both engine fuelling cases, for all the engine operation regimes, and, on the other hand, a considerable decrease in CO and HC emissions when using poor mixtures related to LPG fuelling.
Information on the characteristics of the heating, ventilation, and air conditioning (HVAC) system(s) in the entire BASE building including types of ventilation, equipment configurations, and operation and maintenance issues
Flight Engineer Knowledge Test Guide
DOT National Transportation Integrated Search
1995-01-01
At one time, the flight engineer functioned as an inflight maintenance person. Today, the flight engineer is a technical expert, who must be thoroughly familiar with the operation and function of various airplane : components. The principal function ...
40 CFR 1065.405 - Test engine preparation and maintenance.
Code of Federal Regulations, 2014 CFR
2014-07-01
... modulates an “operator demand” signal such as commanded fuel rate, torque, or power), choose the governor... in the standard-setting part, you may consider emission levels stable without measurement after 50 h...
Maintenance free gas bearing helium blower for nuclear plant
NASA Astrophysics Data System (ADS)
Molyneaux, A., Dr; Harris, M., Prof; Sharkh, S., Prof; Hill, S.; de Graaff, T.
2017-08-01
This paper describes the design, testing and operation of novel helium blowers used to recirculate the helium blanketing gas in the nuclear reactor used as a neutron source at the Institut Laue Langevan, Grenoble, France. The laser sintered shrouded centrifugal wheel operates at speeds up to 45000 rpm supported on helium lubricated hydrodynamic spiral groove bearings, and is driven by a sensorless permanent magnet motor. The entire machine is designed to keep the helium gas (polluted by a small amount of D2O) out of contact with any iron or copper materials which would contribute to the corrosion of parts of the circuit. It is designed to have zero maintenance during a lifetime of 40,000 hours of continuous operation. This paper will describe the spiral groove journal and thrust bearings. Design and manufacture of the 1 kW motor and centrifugal wheel will be explained including their CFD and FEA analyses. Measurements of rotor displacement will be presented showing the behaviour under factory testing as well as details of the measured centrifugal wheel and motor performances. Two machines are incorporated into the circuit to provide redundancy and the first blower has been in continuous operation since Jan 2015. The blower was designed, manufactured, assembled and tested in the UK using predominantly UK suppliers.
Li, Jun-qing; Pan, Quan-ke; Mao, Kun
2014-01-01
A hybrid algorithm which combines particle swarm optimization (PSO) and iterated local search (ILS) is proposed for solving the hybrid flowshop scheduling (HFS) problem with preventive maintenance (PM) activities. In the proposed algorithm, different crossover operators and mutation operators are investigated. In addition, an efficient multiple insert mutation operator is developed for enhancing the searching ability of the algorithm. Furthermore, an ILS-based local search procedure is embedded in the algorithm to improve the exploitation ability of the proposed algorithm. The detailed experimental parameter for the canonical PSO is tuning. The proposed algorithm is tested on the variation of 77 Carlier and Néron's benchmark problems. Detailed comparisons with the present efficient algorithms, including hGA, ILS, PSO, and IG, verify the efficiency and effectiveness of the proposed algorithm. PMID:24883414
Code of Federal Regulations, 2010 CFR
2010-07-01
... preventative maintenance schedule and, as applicable, detailed descriptions of the corrective action procedures... compliance with the operation and maintenance requirements that apply to me? 63.7826 Section 63.7826... Compliance Requirements § 63.7826 How do I demonstrate initial compliance with the operation and maintenance...
Code of Federal Regulations, 2010 CFR
2010-07-01
... compliance with the operation and maintenance requirements that apply to me? 63.7745 Section 63.7745....7745 How do I demonstrate continuous compliance with the operation and maintenance requirements that... maintenance requirements of § 63.7710 by: (1) Making monthly inspections of capture systems and initiating...
Code of Federal Regulations, 2010 CFR
2010-04-01
... and maintenance fund for contract schools. 39.1201 Section 39.1201 Indians BUREAU OF INDIAN AFFAIRS... the Contract School Operation and Maintenance Fund. The Secretary shall cause the distribution of an... an appropriate account or subaccount for the Contract School Operation and Maintenance Fund. ...
Using Facility Condition Assessments to Identify Actions Related to Infrastructure
NASA Technical Reports Server (NTRS)
Rubert, Kennedy F.
2010-01-01
To support cost effective, quality research it is essential that laboratory and testing facilities are maintained in a continuous and reliable state of availability at all times. NASA Langley Research Center (LaRC) and its maintenance contractor, Jacobs Technology, Inc. Research Operations, Maintenance, and Engineering (ROME) group, are in the process of implementing a combined Facility Condition Assessment (FCA) and Reliability Centered Maintenance (RCM) program to improve asset management and overall reliability of testing equipment in facilities such as wind tunnels. Specific areas are being identified for improvement, the deferred maintenance cost is being estimated, and priority is being assigned against facilities where conditions have been allowed to deteriorate. This assessment serves to assist in determining where to commit available funds on the Center. RCM methodologies are being reviewed and enhanced to assure that appropriate preventive, predictive, and facilities/equipment acceptance techniques are incorporated to prolong lifecycle availability and assure reliability at minimum cost. The results from the program have been favorable, better enabling LaRC to manage assets prudently.
40 CFR 63.3100 - What are my general requirements for complying with this subpart?
Code of Federal Regulations, 2010 CFR
2010-07-01
... compliance with the operating limits for emission capture systems and add-on control devices required by § 63... maintain a log detailing the operation and maintenance of the emission capture systems, add-on control... add-on control device performance tests have been completed, as specified in § 63.3160. (f) If your...
40 CFR 63.3100 - What are my general requirements for complying with this subpart?
Code of Federal Regulations, 2013 CFR
2013-07-01
... be in compliance with the operating limits for emission capture systems and add-on control devices...) You must maintain a log detailing the operation and maintenance of the emission capture systems, add... capture system and add-on control device performance tests have been completed, as specified in § 63.3160...
40 CFR 63.3100 - What are my general requirements for complying with this subpart?
Code of Federal Regulations, 2011 CFR
2011-07-01
... compliance with the operating limits for emission capture systems and add-on control devices required by § 63... maintain a log detailing the operation and maintenance of the emission capture systems, add-on control... add-on control device performance tests have been completed, as specified in § 63.3160. (f) If your...
40 CFR 63.3100 - What are my general requirements for complying with this subpart?
Code of Federal Regulations, 2014 CFR
2014-07-01
... be in compliance with the operating limits for emission capture systems and add-on control devices...) You must maintain a log detailing the operation and maintenance of the emission capture systems, add... capture system and add-on control device performance tests have been completed, as specified in § 63.3160...
40 CFR 63.3100 - What are my general requirements for complying with this subpart?
Code of Federal Regulations, 2012 CFR
2012-07-01
... be in compliance with the operating limits for emission capture systems and add-on control devices...) You must maintain a log detailing the operation and maintenance of the emission capture systems, add... capture system and add-on control device performance tests have been completed, as specified in § 63.3160...
2011-05-01
Sustainability Development to Integration NAVSTA Naval Station NT not tested O&M operation and maintenance OSHA Occupational Safety and Health ...Safety and Health Administration The results presented here and data from previous pilot scale and prototype (Hawaii) demonstrations of oily sludge...designed to treat. While additional degradation may have occurred if the system was supplemented with micronutrients and operated in series, it is
Water Distribution System Operation and Maintenance. A Field Study Training Program. Second Edition.
ERIC Educational Resources Information Center
Kerri, Kenneth D.; And Others
Proper installation, inspection, operation, maintenance, repair and management of water distribution systems have a significant impact on the operation and maintenance cost and effectiveness of the systems. The objective of this manual is to provide water distribution system operators with the knowledge and skills required to operate and maintain…
7 CFR 1470.23 - Conservation activity operation and maintenance.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 10 2011-01-01 2011-01-01 false Conservation activity operation and maintenance. 1470... STEWARDSHIP PROGRAM Contracts and Payments § 1470.23 Conservation activity operation and maintenance. The participant will maintain and manage existing conservation activities on the agricultural operation to at...
49 CFR 193.2713 - Training: operations and maintenance.
Code of Federal Regulations, 2014 CFR
2014-10-01
... maintenance activities; and (iii) To carry out aspects of the operating and maintenance procedures under... instructions on the facility operations, including controls, functions, and operating procedures; and (ii) To understand the LNG transfer procedures provided under § 193.2513. (b) A written plan of continuing...
49 CFR 193.2713 - Training: operations and maintenance.
Code of Federal Regulations, 2010 CFR
2010-10-01
... maintenance activities; and (iii) To carry out aspects of the operating and maintenance procedures under... instructions on the facility operations, including controls, functions, and operating procedures; and (ii) To understand the LNG transfer procedures provided under § 193.2513. (b) A written plan of continuing...
49 CFR 193.2713 - Training: operations and maintenance.
Code of Federal Regulations, 2011 CFR
2011-10-01
... maintenance activities; and (iii) To carry out aspects of the operating and maintenance procedures under... instructions on the facility operations, including controls, functions, and operating procedures; and (ii) To understand the LNG transfer procedures provided under § 193.2513. (b) A written plan of continuing...
49 CFR 193.2713 - Training: operations and maintenance.
Code of Federal Regulations, 2012 CFR
2012-10-01
... maintenance activities; and (iii) To carry out aspects of the operating and maintenance procedures under... instructions on the facility operations, including controls, functions, and operating procedures; and (ii) To understand the LNG transfer procedures provided under § 193.2513. (b) A written plan of continuing...
49 CFR 193.2713 - Training: operations and maintenance.
Code of Federal Regulations, 2013 CFR
2013-10-01
... maintenance activities; and (iii) To carry out aspects of the operating and maintenance procedures under... instructions on the facility operations, including controls, functions, and operating procedures; and (ii) To understand the LNG transfer procedures provided under § 193.2513. (b) A written plan of continuing...
1975-07-01
the product , including its operational and maintenance requirements . However, there are many other program elements that are equally critical, i.e...customer needs into meaningful, practical requirements which can be met by the designer, verified in the product and used effectively by the operator. The...and government) and H- Production Verification Testing Requirements , spread over longer delivery periods, causing problems of shop load, high cash
2015-07-01
pace of special operations deployments, but opportunities may exist to better balance the workload across the joint force because activities...executes funding in operation and maintenance; procurement; research , development, test, and evaluation; and military construction accounts.13 SOCOM...regional awareness. Moreover, officials noted that increases in civilian positions were driven partly by DOD’s attempts to rebalance workload and become a
Research on Operation Assessment Method for Energy Meter
NASA Astrophysics Data System (ADS)
Chen, Xiangqun; Huang, Rui; Shen, Liman; chen, Hao; Xiong, Dezhi; Xiao, Xiangqi; Liu, Mouhai; Xu, Renheng
2018-03-01
The existing electric energy meter rotation maintenance strategy regularly checks the electric energy meter and evaluates the state. It only considers the influence of time factors, neglects the influence of other factors, leads to the inaccuracy of the evaluation, and causes the waste of resources. In order to evaluate the running state of the electric energy meter in time, a method of the operation evaluation of the electric energy meter is proposed. The method is based on extracting the existing data acquisition system, marketing business system and metrology production scheduling platform that affect the state of energy meters, and classified into error stability, operational reliability, potential risks and other factors according to the influencing factors, based on the above basic test score, inspecting score, monitoring score, score of family defect detection. Then, according to the evaluation model according to the scoring, we evaluate electric energy meter operating state, and finally put forward the corresponding maintenance strategy of rotation.
A Method of Evaluating Operation of Electric Energy Meter
NASA Astrophysics Data System (ADS)
Chen, Xiangqun; Li, Tianyang; Cao, Fei; Chu, Pengfei; Zhao, Xinwang; Huang, Rui; Liu, Liping; Zhang, Chenglin
2018-05-01
The existing electric energy meter rotation maintenance strategy regularly checks the electric energy meter and evaluates the state. It only considers the influence of time factors, neglects the influence of other factors, leads to the inaccuracy of the evaluation, and causes the waste of resources. In order to evaluate the running state of the electric energy meter in time, a method of the operation evaluation of the electric energy meter is proposed. The method is based on extracting the existing data acquisition system, marketing business system and metrology production scheduling platform that affect the state of energy meters, and classified into error stability, operational reliability, potential risks and other factors according to the influencing factors, based on the above basic test score, inspecting score, monitoring score, score of family defect detection. Then, according to the evaluation model according to the scoring, we evaluate electric energy meter operating state, and finally put forward the corresponding maintenance strategy of rotation.
Void Fraction Instrument operation and maintenance manual
DOE Office of Scientific and Technical Information (OSTI.GOV)
Borgonovi, G.; Stokes, T.I.; Pearce, K.L.
This Operations and Maintenance Manual (O&MM) addresses riser installation, equipment and personnel hazards, operating instructions, calibration, maintenance, removal, and other pertinent information necessary to safely operate and store the Void Fraction Instrument. Final decontamination and decommissioning of the Void Fraction Instrument are not covered in this document.
THE DEVELOPMENT OF A STANDARDIZED ACHIEVEMENT TEST FOR SMALL GASOLINE ENGINE INSTRUCTION.
ERIC Educational Resources Information Center
EBBERT, J. MARVIN
THE PURPOSE OF THE STUDY WAS TO DEVELOP A STANDARDIZED, MULTIPLE-CHOICE ACHIEVEMENT TEST ON THE OPERATION, CARE, AND MAINTENANCE OF SMALL GASOLINE ENGINES. OBJECTIVES AND A UNIT OUTLINE WERE DEVELOPED WITH THE COOPERATION OF 75 INDIANA VOCATIONAL AGRICULTURE TEACHERS. A PANEL SUGGESTED MODIFICATIONS, AND THE REFINED OBJECTIVES AND OUTLINE WERE…
NASA Technical Reports Server (NTRS)
Parker, J. C.
1981-01-01
The project development requirements and criteria are presented along with technical data for the modules. Performance tests included: ducting, temperature, pressure and air flow measurements, dry and wet bulb temperature; duct pressure measurements; and air conditioning apparatus checks; installation, operation, and maintenance instructions are included.
ERIC Educational Resources Information Center
Minnesota State Dept. of Education, St. Paul. Div. of Vocational and Technical Education.
THIS MODULE OF A 25-MODULE COURSE IS DESIGNED TO DEVELOP AN UNDERSTANDING OF THE OPERATING PRINCIPLES AND THE SERVICING AND TESTING PROCEDURES FOR ALTERNATING CURRENT (AC) GENERATORS AND REGULATORS USED ON DIESEL POWERED EQUIPMENT. TOPICS ARE REVIEW OF ALTERNATOR PRINCIPLES, ALTERNATOR SERVICING AND TESTING, ALTERNATOR REGULATOR OPERATING…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Choi, Y.A.; Feltus, M.A.
1995-07-01
Reliability-centered maintenance (RCM) methods are applied to boiling water reactor plant-specific emergency core cooling system probabilistic risk assessment (PRA) fault trees. The RCM is a technique that is system function-based, for improving a preventive maintenance (PM) program, which is applied on a component basis. Many PM programs are based on time-directed maintenance tasks, while RCM methods focus on component condition-directed maintenance tasks. Stroke time test data for motor-operated valves (MOVs) are used to address three aspects concerning RCM: (a) to determine if MOV stroke time testing was useful as a condition-directed PM task; (b) to determine and compare the plant-specificmore » MOV failure data from a broad RCM philosophy time period compared with a PM period and, also, compared with generic industry MOV failure data; and (c) to determine the effects and impact of the plant-specific MOV failure data on core damage frequency (CDF) and system unavailabilities for these emergency systems. The MOV stroke time test data from four emergency core cooling systems [i.e., high-pressure coolant injection (HPCI), reactor core isolation cooling (RCIC), low-pressure core spray (LPCS), and residual heat removal/low-pressure coolant injection (RHR/LPCI)] were gathered from Philadelphia Electric Company`s Peach Bottom Atomic Power Station Units 2 and 3 between 1980 and 1992. The analyses showed that MOV stroke time testing was not a predictor for eminent failure and should be considered as a go/no-go test. The failure data from the broad RCM philosophy showed an improvement compared with the PM-period failure rates in the emergency core cooling system MOVs. Also, the plant-specific MOV failure rates for both maintenance philosophies were shown to be lower than the generic industry estimates.« less
Smart call box field operational test evaluation : subtest reports
DOT National Transportation Integrated Search
1997-05-01
Smart call boxes are an enhanced version of devices used as emergency call boxes in California. The overall system consists of a microprocessor, a cellular communications transceiver, solar power sources, data collection devices, maintenance computer...
Smart call box field operational test evaluation : summary report
DOT National Transportation Integrated Search
1997-05-01
Smart call boxes are an enhanced version of devices used as emergency call boxes in California. The overall system consists of a microprocessor, a cellular communications transceiver, solar power sources, data collection devices, maintenance computer...
Long-Term Pavement Performance Program falling weight deflectometer maintenance manual
DOT National Transportation Integrated Search
2006-12-01
The Federal Highway Administrations (FHWA) Long-Term Pavement Performance (LTPP) program operates eight Dynatest Model 8000 FWDs to collect deflection data on in-service pavement test sections across North America. LTPP has collected pavement defl...
75 FR 7411 - Schedule of Water Charges
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-19
... sale revenues, while the costs of reservoir maintenance and operations, contractual services and..., ``including debt service, operation, maintenance, replacement, reserves, and associated administrative costs... holds funds dedicated to pay the costs of project construction, operation, maintenance, and replacement...
Small Water System Operations and Maintenance. A Field Study Training Program. Second Edition.
ERIC Educational Resources Information Center
Kerri, Kenneth D.; And Others
Proper installation, inspection, operation, maintenance, repair and management of small water systems have a significant impact on the operation and maintenance cost and effectiveness of the systems. The objective of this manual is to provide small water system operators with the knowledge and skills required to operate and maintain these systems…
14 CFR 91.421 - Rebuilt engine maintenance records.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Rebuilt engine maintenance records. 91.421..., Preventive Maintenance, and Alterations § 91.421 Rebuilt engine maintenance records. (a) The owner or operator may use a new maintenance record, without previous operating history, for an aircraft engine...
14 CFR 91.421 - Rebuilt engine maintenance records.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 2 2012-01-01 2012-01-01 false Rebuilt engine maintenance records. 91.421..., Preventive Maintenance, and Alterations § 91.421 Rebuilt engine maintenance records. (a) The owner or operator may use a new maintenance record, without previous operating history, for an aircraft engine...
Parenreng, Jumadi Mabe; Kitagawa, Akio
2018-05-17
Wireless Sensor Networks (WSNs) with limited battery, central processing units (CPUs), and memory resources are a widely implemented technology for early warning detection systems. The main advantage of WSNs is their ability to be deployed in areas that are difficult to access by humans. In such areas, regular maintenance may be impossible; therefore, WSN devices must utilize their limited resources to operate for as long as possible, but longer operations require maintenance. One method of maintenance is to apply a resource adaptation policy when a system reaches a critical threshold. This study discusses the application of a security level adaptation model, such as an ARSy Framework, for using resources more efficiently. A single node comprising a Raspberry Pi 3 Model B and a DS18B20 temperature sensor were tested in a laboratory under normal and stressful conditions. The result shows that under normal conditions, the system operates approximately three times longer than under stressful conditions. Maintaining the stability of the resources also enables the security level of a network's data output to stay at a high or medium level.
Kitagawa, Akio
2018-01-01
Wireless Sensor Networks (WSNs) with limited battery, central processing units (CPUs), and memory resources are a widely implemented technology for early warning detection systems. The main advantage of WSNs is their ability to be deployed in areas that are difficult to access by humans. In such areas, regular maintenance may be impossible; therefore, WSN devices must utilize their limited resources to operate for as long as possible, but longer operations require maintenance. One method of maintenance is to apply a resource adaptation policy when a system reaches a critical threshold. This study discusses the application of a security level adaptation model, such as an ARSy Framework, for using resources more efficiently. A single node comprising a Raspberry Pi 3 Model B and a DS18B20 temperature sensor were tested in a laboratory under normal and stressful conditions. The result shows that under normal conditions, the system operates approximately three times longer than under stressful conditions. Maintaining the stability of the resources also enables the security level of a network’s data output to stay at a high or medium level. PMID:29772773
High-level neutron coincidence counter maintenance manual
DOE Office of Scientific and Technical Information (OSTI.GOV)
Swansen, J.; Collinsworth, P.
1983-05-01
High-level neutron coincidence counter operational (field) calibration and usage is well known. This manual makes explicit basic (shop) check-out, calibration, and testing of new units and is a guide for repair of failed in-service units. Operational criteria for the major electronic functions are detailed, as are adjustments and calibration procedures, and recurrent mechanical/electromechanical problems are addressed. Some system tests are included for quality assurance. Data on nonstandard large-scale integrated (circuit) components and a schematic set are also included.
Space shuttle low cost/risk avionics study
NASA Technical Reports Server (NTRS)
1971-01-01
All work breakdown structure elements containing any avionics related effort were examined for pricing the life cycle costs. The analytical, testing, and integration efforts are included for the basic onboard avionics and electrical power systems. The design and procurement of special test equipment and maintenance and repair equipment are considered. Program management associated with these efforts is described. Flight test spares and labor and materials associated with the operations and maintenance of the avionics systems throughout the horizontal flight test are examined. It was determined that cost savings can be achieved by using existing hardware, maximizing orbiter-booster commonality, specifying new equipments to MIL quality standards, basing redundancy on cost effective analysis, minimizing software complexity and reducing cross strapping and computer-managed functions, utilizing compilers and floating point computers, and evolving the design as dictated by the horizontal flight test schedules.
Integration of MSFC Usability Lab with Usability Testing
NASA Technical Reports Server (NTRS)
Cheng, Yiwei; Richardson, Sally
2010-01-01
As part of the Stage Analysis Branch, human factors engineering plays an important role in relating humans to the systems of hardware and structure designs of the new launch vehicle. While many branches are involved in the technical aspects of creating a launch vehicle, human factors connects humans to the scientific systems with the goal of improving operational performance and safety while reducing operational error and damage to the hardware. Human factors engineers use physical and computerized models to visualize possible areas for improvements to ensure human accessibility to components requiring maintenance and that the necessary maintenance activities can be accomplished with minimal risks to human and hardware. Many methods of testing are used to fulfill this goal, such as physical mockups, computerized visualization, and usability testing. In this analysis, a usability test is conducted to test how usable a website is to users who are and are not familiar with it. The testing is performed using participants and Morae software to record and analyze the results. This analysis will be a preliminary test of the usability lab in preparation for use in new spacecraft programs, NASA Enterprise, or other NASA websites. The usability lab project is divided into two parts: integration of the usability lab and a preliminary test of the usability lab.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chandler, K.; Eudy, L.
2009-01-01
This is an evaluation of hydrogen fuel cell transit buses operating at AC Transit in revenue service since March 20, 2006 compared to similar diesel buses operating from the same depot. This evaluation report includes results from November 2007 through October 2008. Evaluation results include implementation experience, fueling station operation, fuel cell bus operations at Golden Gate Transit, and evaluation results at AC Transit (bus usage, availability, fuel economy, maintenance costs, and roadcalls).
7 CFR 654.15 - Operation and maintenance.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 6 2011-01-01 2011-01-01 false Operation and maintenance. 654.15 Section 654.15 Agriculture Regulations of the Department of Agriculture (Continued) NATURAL RESOURCES CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES OPERATION AND MAINTENANCE Federal Financially-Assisted Projects...
7 CFR 654.15 - Operation and maintenance.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 7 Agriculture 6 2012-01-01 2012-01-01 false Operation and maintenance. 654.15 Section 654.15 Agriculture Regulations of the Department of Agriculture (Continued) NATURAL RESOURCES CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES OPERATION AND MAINTENANCE Federal Financially-Assisted Projects...
7 CFR 654.15 - Operation and maintenance.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 6 2013-01-01 2013-01-01 false Operation and maintenance. 654.15 Section 654.15 Agriculture Regulations of the Department of Agriculture (Continued) NATURAL RESOURCES CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES OPERATION AND MAINTENANCE Federal Financially-Assisted Projects...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cle Elum Supplementation and Research Facility
2009-01-12
FISH PRODUCTION: Brood year 2008 production and experimental hatchery & supplemental crossed eggs continue to be incubated and chilled water at 380 Fahrenheit for the month. Temperature units are {approx}960 TU's at the end of the month. Hatching was observed at {approx}900 temperature units (TU's). The 2007 Brood year (BY) has approximately 773,477 juveniles on hand at the end of December, averaging 30.6 fish per pound. Fish tagging operations wrapped up on the 5th. Transportation of fish to acclimation sites is tentatively scheduled to begin January 12th. FISH CULTURE: Production pond cleaning continues on a weekly basis, and feeding continuesmore » to be performed two days per week due to the colder river water temperatures. Eggs in the incubation continue to be tempered in 38 degree water and temperature units recorded daily. On the 20th the river became too inclement for normal operations as the intake screens were covered with ice, at that time we shutdown two river pumps and turned on wells four and six to get 6,825 gallons of water. This was the operation at the facility for twenty-four hours at which point we were able to get back to normal operations. WATER PRODUCTION: The current combined well and river water supply to the complex is 14,756 gallons/min. The river pumps are supplying 13,571 gallons per minute. Well pumps No.2 and No.4 are operating and supplying 1,185 gallons/min. More on well pumps in the well field maintenance section of this report. ACCLIMATION SITES: Preparation of acclimation sites for fish transfer was the main focus for the month of December. Each week thermographs that record water temperature have the data disc changed at the acclimations sites. Ford Excavation with assistance from YKFP maintenance has started clearing snow out of the Easton acclimation site. VEHICLE MAINTENANCE: The snowmobiles were taken in to have annual maintenance performed. The full-size John Deere tractor needed and was taken to Barnet Implement in Yakima. The tractor needed a new clutch installed and was picked up on the 31st. SHOP BUILDING MAINTENANCE: On the 12th the facility domestic water hydro pneumatic tank and its system malfunctioned. The problem persisted and had to be dealt with multiple times; first it caused the tank to over flow and floods the shop. Wallace Electric was called and after extensive monitoring of the tank, compressor and electrical operations an electrical relay switch was replaced. Weekly cleaning and tool inventory continues to be a priority. The shop is home to our liberation truck along with fish transfer equipment, fish pump and seine nets. ELECTRICAL BUILDING MAINTENANCE: The large generator is located in the electrical building and is checked daily for routine inspections. HATCHERY BUILDING MAINTENANCE: The incubation building is being used to clean and repair isolation buckets, egg incubation baskets and troughs. An experiment involving remote site incubators (RSI's) continued through the month. Chad Stockton, WDFW, records flows and monitors emergence of fry on a daily basis. Chad is working with Steve S. and Curt K. on the RSI's research along with spawning channel fry emergence. RIVERWATER COOLING FACILITY: The one pump in operation in this building is checked daily during our routine inspections, the variable pump is supplying water to the artificial spawning channel. RIVER PUMP STATION MAINTENANCE: All four river pumps are in operation and pumping {approx}13,571 gallons/min to the facility. The building is cleaned monthly and the air burst system is cycled daily during the morning checks. The crew continued weekly changing of the graph paper on the river temperature thermograph throughout the month, continuing this activity as part of the daily checks routine. WELL FIELD MAINTENANCE: Wells No.1 and No.4 were in operation and supplying 1,185 gallons/minute to the facility and incubation building. Weekly test well readings are recorded and sent via fax to CH2MHILL. Also weekly well meter readings are recorded. Well No.5 had been determined to have a faulty drain valve while trying to operate the pump for emergency water usage. It was determined that water was not able to drain and began to flow out from the test hole (TH9). Charlie and Simon pumped out the remaining water from the test hole prior to replacing the valve. The valve was subsequently dug up, replaced and tested for operation. SAFETY AND TRAINING: The winter season has approached and conditions can be hazardous as Cle Elum staff stress safety while working and preparing acclimation sites for upcoming fish transfer. Some examples include wearing proper clothing, extra caution while driving and plowing snow. GROUNDS: Linda Lamebull of fisheries and personnel from Tribal Purchasing came to the hatchery to inventory two way radios.« less
Code of Federal Regulations, 2012 CFR
2012-04-01
... Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER IRRIGATION OPERATION AND...) Annual operation and maintenance assessment rates may be lowered through the exercise of our discretion... supplemental water is available, the calculation of your annual operation and maintenance assessment rate may...
Code of Federal Regulations, 2013 CFR
2013-04-01
... Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER IRRIGATION OPERATION AND...) Annual operation and maintenance assessment rates may be lowered through the exercise of our discretion... supplemental water is available, the calculation of your annual operation and maintenance assessment rate may...
Code of Federal Regulations, 2014 CFR
2014-04-01
... Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER IRRIGATION OPERATION AND...) Annual operation and maintenance assessment rates may be lowered through the exercise of our discretion... supplemental water is available, the calculation of your annual operation and maintenance assessment rate may...
8. VIEW OF E3 WORK STATION WITH MANIPULATOR ARMS IN ...
8. VIEW OF E-3 WORK STATION WITH MANIPULATOR ARMS IN EAST OPERATING GALLERY LOOKING INTO THE HOT BAY. - Nevada Test Site, Engine Maintenance Assembly & Disassembly Facility, Area 25, Jackass Flats, Mercury, Nye County, NV
5. VIEW TO THE SOUTHEAST OF THE HOT BAY AND ...
5. VIEW TO THE SOUTHEAST OF THE HOT BAY AND ATTACHED OPERATING GALLERIES ALONG THE WEST SIDE OF THE BAY. - Nevada Test Site, Engine Maintenance Assembly & Disassembly Facility, Area 25, Jackass Flats, Mercury, Nye County, NV
Orientation to Municipal Wastewater Treatment. Training Manual.
ERIC Educational Resources Information Center
Office of Water Program Operations (EPA), Cincinnati, OH. National Training and Operational Technology Center.
Introductory-level material on municipal wastewater treatment facilities and processes is presented. Course topics include sources and characteristics of municipal wastewaters; objectives of wastewater treatment; design, operation, and maintenance factors; performance testing; plant staffing; and laboratory considerations. Chapter topics include…
Stormwater and Wastewater Infrastructure Monitoring Test Bed
The growing application of stormwater and wastewater management in urban and urbanizing environments is increasing the demand for monitoring technologies and systems that can provide reliable performance data, in real-time or near real-time, for operation and maintenance decision...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Curley, C.C.; Olesen, P.
1976-09-01
The Martins Creek SES units 3 and 4 are 820 MW crude oil- or residual oil-fired power units. The forced draft and induced draft fans used in the plants are variable pitch axial flow units. The design, operation, maintenance, and field testing of these fans are discussed. (LCL)
In Situ Soil Venting - Full Scale Test, Hill AFB. Volume 3. Guidance Document, Literature Review
1991-08-01
s ý GCE Form A•pproved REPORT DOCUMENTATION PAGE CMBNO 070401’ihs a EERORT C ,RI Y C•.ASSFCA ,ON ’t .• ESTR !CTiVE MARKINGS .a SECURT’Y CLASSiFICAT... labor -intensive, operating costs are relatively low. Major operating costs are sampling, sample analysis, power, maintenance, and emissions control
Process Time Refinement for Reusable Launch Vehicle Regeneration Modeling
2008-03-01
predicted to fail, or have failed. 3) Augmenting existing space systems with redundant or additional capability to enhance space system performance or...Canopies, External Tanks/Pods/Pylon Ejectors , Armament Bay Doors, Missile Launchers, Wing and Fuselage Center Line Racks, Bomb Bay Release...Systems Test 04583 Thrust Maintenance Operation 04584 Silo Door Operation 04650 Initial Build-up-Recovery Vehicle (RV) 147 04610 Nondestructive
DOE Office of Scientific and Technical Information (OSTI.GOV)
Weitzel, Paul
2016-05-13
The Babcock & Wilcox Company (B&W) performed a Pre-Front End Engineering Design (Pre-FEED) of an A-USC steam superheater for a proposed component test program achieving 760°C (1400°F) steam temperature. This would lead to follow-on work in a Phase 2 and Phase 3 that would involve detail design, manufacturing, construction and operation of the ComTest. Phase 1 results have provided the engineering data necessary for proceeding to the next phase of ComTest. The steam generator superheater would subsequently supply the steam to an A-USC prototype intermediate pressure steam turbine. The ComTest program is important in that it will place functioning A-USCmore » components in operation and in coordinated boiler and turbine service. It is also important to introduce the power plant operation and maintenance personnel to the level of skills required and provide the first background experience with hands-on training. The project will provide a means to exercise the complete supply chain events required in order to practice and perfect the process for A-USC power plant design, supply, manufacture, construction, commissioning, operation and maintenance. Representative participants will then be able to transfer knowledge and recommendations to the industry. ComTest is conceived in the manner of using a separate standalone plant facility that will not jeopardize the host facility or suffer from conflicting requirements in the host plant’s mission that could sacrifice the nickel alloy components and not achieve the testing goals. ComTest will utilize smaller quantities of the expensive materials and reduce the risk in the first operational practice for A-USC technology in the United States. Components at suitable scale in ComTest provide more assurance before putting them into practice in the full size A-USC demonstration plant.« less
Operation and maintenance cost data for residential photovoltaic modules/panels
NASA Technical Reports Server (NTRS)
Oster, J. R., Jr.; Zaremski, D. R., Jr.; Albert, E. M.; Hawkins, S. L.
1980-01-01
Costs associated with the operation and maintenance of residential photovoltaic modules and arrays are studied. Six basic topics related to operation and maintenance to photovoltaic arrays are investigated: maintenance; cleaning; panel replacement; gasket repair/replacement; wiring repair/replacement; and termination repair/replacement. The effects of the mounting types (rack mount, stand off mount, direct mount and integral mount) and the installation/replacement type (sequential, partial interruption and independent) are identified and described. Methods of reducing maintenance costs are suggested.
Optical Measurements for Intelligent Aerospace Propulsion
NASA Technical Reports Server (NTRS)
Mercer, Carolyn R.
2003-01-01
There is growing interest in applying intelligent technologies to aerospace propulsion systems to reap expected benefits in cost, performance, and environmental compliance. Cost benefits span the engine life cycle from development, operations, and maintenance. Performance gains are anticipated in reduced fuel consumption, increased thrust-toweight ratios, and operability. Environmental benefits include generating fewer pollutants and less noise. Critical enabling technologies to realize these potential benefits include sensors, actuators, logic, electronics, materials, and structures. For propulsion applications, the challenge is to increase the robustness of these technologies so that they can withstand harsh temperatures, vibrations, and grime while providing extremely reliable performance. This paper addresses the role that optical metrology is playing in providing solutions to these challenges. Optics for ground-based testing (development cycle), flight sensing (operations), and inspection (maintenance) are described. Opportunities for future work are presented.
2011-05-24
1 ARC 5/24/2011 UNCLASSIFIED: Distribution Statement A. Approved for public release Amandeep Singh1, Igor Baseski1,2 1U.S. Army, RDECOM TARDEC...of information is estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources, gathering...currently valid OMB control number. 1 . REPORT DATE 24 MAY 2011 2. REPORT TYPE Briefing Charts 3. DATES COVERED 24-05-2011 to 24-05-2011 4. TITLE
7 CFR 654.41 - Performance of operation and maintenance.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 7 Agriculture 6 2012-01-01 2012-01-01 false Performance of operation and maintenance. 654.41 Section 654.41 Agriculture Regulations of the Department of Agriculture (Continued) NATURAL RESOURCES CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES OPERATION AND MAINTENANCE Emergency...
7 CFR 654.41 - Performance of operation and maintenance.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 6 2011-01-01 2011-01-01 false Performance of operation and maintenance. 654.41 Section 654.41 Agriculture Regulations of the Department of Agriculture (Continued) NATURAL RESOURCES CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES OPERATION AND MAINTENANCE Emergency...
7 CFR 654.41 - Performance of operation and maintenance.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 6 2010-01-01 2010-01-01 false Performance of operation and maintenance. 654.41 Section 654.41 Agriculture Regulations of the Department of Agriculture (Continued) NATURAL RESOURCES CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES OPERATION AND MAINTENANCE Emergency...
7 CFR 654.41 - Performance of operation and maintenance.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 6 2013-01-01 2013-01-01 false Performance of operation and maintenance. 654.41 Section 654.41 Agriculture Regulations of the Department of Agriculture (Continued) NATURAL RESOURCES CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES OPERATION AND MAINTENANCE Emergency...
7 CFR 654.41 - Performance of operation and maintenance.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 7 Agriculture 6 2014-01-01 2014-01-01 false Performance of operation and maintenance. 654.41 Section 654.41 Agriculture Regulations of the Department of Agriculture (Continued) NATURAL RESOURCES CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES OPERATION AND MAINTENANCE Emergency...
76 FR 30925 - Information Collection; Submission for OMB Review, Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-27
.../startup): None. Total Burden Cost (operating/maintenance): None. Instrument: Application and Budget.../startup): None. Total Burden Cost (operating/maintenance): None. AmeriCorps\\*\\VISTA Project Progress...,800 hours. Total Burden Cost (capital/startup): None. Total Burden Cost (operating/maintenance): None...
Advanced servomanipulator remote maintenance demonstration
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bradley, E.C.; Ladd, L.D.
1988-01-01
The Fuel Recycle Division (FRD) of the Oak Ridge National Laboratory (ORNL) is developing remote maintenance systems for the Consolidated Fuel Reprocessing Program for applications in future nuclear fuel cycle facilities. The most recent development is the advanced servomanipulator (ASM), a digitally controlled, force-reflecting, dual-arm, master/slave servomanipulator. A unique feature of ASM is that the slave arms are remotely maintainable. The ASM slave arms are composed of modules, each of which is capable of being removed and replaced by another manipulator system. The intent of this test was to demonstrate that the ASM slave arms could be completely disassembled andmore » reassembled remotely. This remote maintenance demonstration was performed using the Remote Operations and Maintenance Demonstration (ROMD) facility model M-2 servomanipulator maintenance system. Maintenance of ASM was successfully demonstrated using the M-2 servomanipulator and special fixtures. Recommendations, generally applicable to other remotely maintained equipment, have been made for maintainability improvements. 3 refs., 5 figs.« less
Ficken, James H.; Scott, Carl T.
1988-01-01
This manual describes the U.S. Geological Survey Minimonitor Water Quality Data Measuring and Recording System. Instructions for calibrating, servicing, maintaining, and operating the system are provided. The Survey Minimonitor is a battery-powered , multiparameter water quality monitoring instrument designed for field use. A watertight can containing signal conditioners is connected with cable and waterproof connectors to various water quality sensors. Data are recorded on a punched paper-tape recorder. An external battery is required. The operation and maintenance of various sensors and signal conditioners are discussed, for temperature, specific conductance, dissolved oxygen, and pH. Calibration instructions are provided for each parameter, along with maintenance instructions. Sections of the report explain how to connect the Minimonitor to measure direct-current voltages, such as signal outputs from other instruments. Instructions for connecting a satellite data-collection platform or a solid-state data recorder to the Minimonitor are given also. Basic information is given for servicing the Minimonitor and trouble-shooting some of its electronic components. The use of test boxes to test sensors, isolate component problems, and verify calibration values is discussed. (USGS)
Phase editing as a signal pre-processing step for automated bearing fault detection
NASA Astrophysics Data System (ADS)
Barbini, L.; Ompusunggu, A. P.; Hillis, A. J.; du Bois, J. L.; Bartic, A.
2017-07-01
Scheduled maintenance and inspection of bearing elements in industrial machinery contributes significantly to the operating costs. Savings can be made through automatic vibration-based damage detection and prognostics, to permit condition-based maintenance. However automation of the detection process is difficult due to the complexity of vibration signals in realistic operating environments. The sensitivity of existing methods to the choice of parameters imposes a requirement for oversight from a skilled operator. This paper presents a novel approach to the removal of unwanted vibrational components from the signal: phase editing. The approach uses a computationally-efficient full-band demodulation and requires very little oversight. Its effectiveness is tested on experimental data sets from three different test-rigs, and comparisons are made with two state-of-the-art processing techniques: spectral kurtosis and cepstral pre- whitening. The results from the phase editing technique show a 10% improvement in damage detection rates compared to the state-of-the-art while simultaneously improving on the degree of automation. This outcome represents a significant contribution in the pursuit of fully automatic fault detection.
40 CFR 1048.205 - What must I include in my application?
Code of Federal Regulations, 2011 CFR
2011-07-01
... (AECDs) and all fuel-system components you will install on any production or test engine. Identify the... fuel types on which your engines are designed to operate (for example, gasoline and natural gas). List... maintenance you did. (g) List the specifications of each test fuel to show that it falls within the required...
40 CFR 1048.205 - What must I include in my application?
Code of Federal Regulations, 2012 CFR
2012-07-01
... (AECDs) and all fuel-system components you will install on any production or test engine. Identify the... fuel types on which your engines are designed to operate (for example, gasoline and natural gas). List... maintenance you did. (g) List the specifications of each test fuel to show that it falls within the required...
Technical information report: Plasma melter operation, reliability, and maintenance analysis
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hendrickson, D.W.
1995-03-14
This document provides a technical report of operability, reliability, and maintenance of a plasma melter for low-level waste vitrification, in support of the Hanford Tank Waste Remediation System (TWRS) Low-Level Waste (LLW) Vitrification Program. A process description is provided that minimizes maintenance and downtime and includes material and energy balances, equipment sizes and arrangement, startup/operation/maintence/shutdown cycle descriptions, and basis for scale-up to a 200 metric ton/day production facility. Operational requirements are provided including utilities, feeds, labor, and maintenance. Equipment reliability estimates and maintenance requirements are provided which includes a list of failure modes, responses, and consequences.
Code of Federal Regulations, 2010 CFR
2010-07-01
... services for cleaning, mechanical operation, and maintenance identified in an OA? 102-85.175 Section 102-85... of Service § 102-85.175 Are the standard level services for cleaning, mechanical operation, and..., mechanical operation, and maintenance shall be provided in accordance with the GSA standard level of services...
Code of Federal Regulations, 2012 CFR
2012-01-01
... (e) of this section must select, identify in the aircraft maintenance records, and use one of the... AND GENERAL OPERATING RULES GENERAL OPERATING AND FLIGHT RULES Maintenance, Preventive Maintenance... person may operate an aircraft unless, within the preceding 12 calendar months, it has had— (1) An annual...
Code of Federal Regulations, 2011 CFR
2011-01-01
... (e) of this section must select, identify in the aircraft maintenance records, and use one of the... AND GENERAL OPERATING RULES GENERAL OPERATING AND FLIGHT RULES Maintenance, Preventive Maintenance... person may operate an aircraft unless, within the preceding 12 calendar months, it has had— (1) An annual...
Code of Federal Regulations, 2014 CFR
2014-01-01
... (e) of this section must select, identify in the aircraft maintenance records, and use one of the... AND GENERAL OPERATING RULES GENERAL OPERATING AND FLIGHT RULES Maintenance, Preventive Maintenance... person may operate an aircraft unless, within the preceding 12 calendar months, it has had— (1) An annual...
Code of Federal Regulations, 2013 CFR
2013-01-01
... (e) of this section must select, identify in the aircraft maintenance records, and use one of the... AND GENERAL OPERATING RULES GENERAL OPERATING AND FLIGHT RULES Maintenance, Preventive Maintenance... person may operate an aircraft unless, within the preceding 12 calendar months, it has had— (1) An annual...
14 CFR 91.1433 - CAMP: Maintenance and preventive maintenance training program.
Code of Federal Regulations, 2010 CFR
2010-01-01
..., DEPARTMENT OF TRANSPORTATION (CONTINUED) AIR TRAFFIC AND GENERAL OPERATING RULES GENERAL OPERATING AND FLIGHT RULES Fractional Ownership Operations Program Management § 91.1433 CAMP: Maintenance and preventive... each person (including inspection personnel) who determines the adequacy of work done is fully informed...
7 CFR 654.12 - Financing operations and maintenance.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 6 2010-01-01 2010-01-01 false Financing operations and maintenance. 654.12 Section 654.12 Agriculture Regulations of the Department of Agriculture (Continued) NATURAL RESOURCES... Financially-Assisted Projects § 654.12 Financing operations and maintenance. Sources of funds needed to...
Depot Maintenance: Executed Workload and Maintenance Operations at DOD Depots
2017-02-03
Page 1 GAO-17-82R Depot Maintenance 441 G St. N.W. Washington, DC 20548 February 3, 2017 The Honorable John McCain Chairman The...Smith Ranking Member Committee on Armed Services House of Representatives Depot Maintenance : Executed Workload and Maintenance Operations at DOD...Depots The Department of Defense (DOD) uses its maintenance capabilities to maintain, overhaul, and repair its military weapon systems (such as
DOT National Transportation Integrated Search
1994-08-01
This handbook was developed to assist design, traffic, and maintenance engineering personnel in making determinations about roadway delineation systems, including the appropriate system for a given situation, when a system has reached the end of its ...
Code of Federal Regulations, 2013 CFR
2013-10-01
... subpart prescribes policies and procedures for implementing the National Competitiveness Technology... technology transfer be established as a mission of each Government-owned laboratory operated under contract... purposes and are engaged in the production, maintenance, testing, or dismantlement of a nuclear weapon or...
Code of Federal Regulations, 2011 CFR
2011-10-01
... subpart prescribes policies and procedures for implementing the National Competitiveness Technology... technology transfer be established as a mission of each Government-owned laboratory operated under contract... purposes and are engaged in the production, maintenance, testing, or dismantlement of a nuclear weapon or...
Code of Federal Regulations, 2010 CFR
2010-10-01
... subpart prescribes policies and procedures for implementing the National Competitiveness Technology... technology transfer be established as a mission of each Government-owned laboratory operated under contract... purposes and are engaged in the production, maintenance, testing, or dismantlement of a nuclear weapon or...
Code of Federal Regulations, 2014 CFR
2014-10-01
... subpart prescribes policies and procedures for implementing the National Competitiveness Technology... technology transfer be established as a mission of each Government-owned laboratory operated under contract... purposes and are engaged in the production, maintenance, testing, or dismantlement of a nuclear weapon or...
Code of Federal Regulations, 2012 CFR
2012-10-01
... subpart prescribes policies and procedures for implementing the National Competitiveness Technology... technology transfer be established as a mission of each Government-owned laboratory operated under contract... purposes and are engaged in the production, maintenance, testing, or dismantlement of a nuclear weapon or...
A high school is supplied with solar energy--Dallas, Texas
NASA Technical Reports Server (NTRS)
1981-01-01
System preheats 100 percent of domestic hot water and supplies almost half of heating requirements for three story, concrete frame, brick building with basement. Final report includes details of installation, operation and maintenance, contract negotiation, and acceptance test plan.
Information on the characteristics of the heating, ventilation, and air conditioning (HVAC) system(s) in the entire BASE building including types of ventilation, equipment configurations, and operation and maintenance issues
Laboratory services series: a programmed maintenance system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tuxbury, D.C.; Srite, B.E.
1980-01-01
The diverse facilities, operations and equipment at a major national research and development laboratory require a systematic, analytical approach to operating equipment maintenance. A computer-scheduled preventive maintenance program is described including program development, equipment identification, maintenance and inspection instructions, scheduling, personnel, and equipment history.
The use of emulator-based simulators for on-board software maintenance
NASA Astrophysics Data System (ADS)
Irvine, M. M.; Dartnell, A.
2002-07-01
Traditionally, onboard software maintenance activities within the space sector are performed using hardware-based facilities. These facilities are developed around the use of hardware emulation or breadboards containing target processors. Some sort of environment is provided around the hardware to support the maintenance actives. However, these environments are not easy to use to set-up the required test scenarios, particularly when the onboard software executes in a dynamic I/O environment, e.g. attitude control software, or data handling software. In addition, the hardware and/or environment may not support the test set-up required during investigations into software anomalies, e.g. raise spurious interrupt, fail memory, etc, and the overall "visibility" of the software executing may be limited. The Software Maintenance Simulator (SOMSIM) is a tool that can support the traditional maintenance facilities. The following list contains some of the main benefits that SOMSIM can provide: Low cost flexible extension to existing product - operational simulator containing software processor emulator; System-level high-fidelity test-bed in which software "executes"; Provides a high degree of control/configuration over the entire "system", including contingency conditions perhaps not possible with real hardware; High visibility and control over execution of emulated software. This paper describes the SOMSIM concept in more detail, and also describes the SOMSIM study being carried out for ESA/ESOC by VEGA IT GmbH.
Highway Maintenance Equipment Operator. Miscellaneous Equipment. Training Materials.
ERIC Educational Resources Information Center
Perky, Sandra Dutreau; And Others
This curriculum guide provides instructional materials to assist in training equipment operators in the safe and effective use of highway maintenance equipment. It includes six units of instruction covering the small, specialized equipment used in maintenance operations. Each unit of instruction consists of eight basic components: performance…
24 CFR 1006.325 - Maintenance, management and efficient operation.
Code of Federal Regulations, 2010 CFR
2010-04-01
... § 1006.325 Maintenance, management and efficient operation. (a) Written policies. The DHHL must develop... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Maintenance, management and efficient operation. 1006.325 Section 1006.325 Housing and Urban Development Regulations Relating to Housing...
40 CFR 610.23 - Operator interaction effects.
Code of Federal Regulations, 2010 CFR
2010-07-01
... degree of sensitivity of device effectiveness to variances in installation, operation and maintenance; (b..., operation and maintenance; (c) The extent to which device installation or use, or the effects of such... between total cost of ownership of the device (purchase price plus maintenance costs) and the cost savings...
Value centric approaches to the design, operations and maintenance of wind turbines
NASA Astrophysics Data System (ADS)
Khadabadi, Madhur Aravind
Wind turbine maintenance is emerging as an unexpectedly high component of turbine operating cost, and there is an increasing interest in managing this cost. This thesis presents an alternative view of maintenance as a value-driver, and develops an optimization algorithm to evaluate the value delivered by different maintenance techniques. I view maintenance as an operation that moves the turbine to an improved state in which it can generate more power and, thus, earn more revenue. To implement this approach, I model the stochastic deterioration of the turbine in two dimensions: the deterioration rate, and the extent of deterioration, and then use maintenance to improve the state of the turbine. The value of the turbine is the difference between the revenue from to the power generation and the costs incurred in operation and maintenance. With a focus on blade deterioration, I evaluate the value delivered by implementing two different maintenance schemes, predictive maintenance and scheduled maintenance. An example of predictive maintenance technique is the use of Condition Monitoring Systems to precisely detect deterioration. I model Condition Monitoring System (CMS) of different degrees of fidelity, where a higher fidelity CMS would allow the blade state to be determined with a higher precision. The same model is then applied for the scheduled maintenance technique. The improved state information obtained from these techniques is then used to derive an optimal maintenance strategy. The difference between the value of the turbine with and without the inspection type can be interpreted as the value of the inspection. The results indicate that a higher fidelity (and more expensive) inspection method does not necessarily yield the highest value, and, that there is an optimal level of fidelity that results in maximum value. The results also aim to inform the operator of the impact of regional parameters such as wind speed, variance and maintenance costs to the optimal maintenance strategy. The contributions of this work are twofold. First, I present a practical approach to wind turbine valuation that takes operating and market conditions into account. This work should therefore be useful to wind farm operators, investors and decision makers. Second, I show how the value of a maintenance scheme can be explicitly assessed for different conditions.
1984-01-01
performance, diagnosing performance problems, taking corrective actions, and providing training. This report provides instructions for operating the maintenance management information system of MPS-O.
CERN experience and strategy for the maintenance of cryogenic plants and distribution systems
NASA Astrophysics Data System (ADS)
Serio, L.; Bremer, J.; Claudet, S.; Delikaris, D.; Ferlin, G.; Pezzetti, M.; Pirotte, O.; Tavian, L.; Wagner, U.
2015-12-01
CERN operates and maintains the world largest cryogenic infrastructure ranging from ageing installations feeding detectors, test facilities and general services, to the state-of-the-art cryogenic system serving the flagship LHC machine complex. After several years of exploitation of a wide range of cryogenic installations and in particular following the last two years major shutdown to maintain and consolidate the LHC machine, we have analysed and reviewed the maintenance activities to implement an efficient and reliable exploitation of the installations. We report the results, statistics and lessons learned on the maintenance activities performed and in particular the required consolidations and major overhauling, the organization, management and methodologies implemented.
NASA Technical Reports Server (NTRS)
Woodbury, Sarah K.
2008-01-01
The introduction of United Space Alliance's Human Engineering Modeling and Performance Laboratory began in early 2007 in an attempt to address the problematic workspace design issues that the Space Shuttle has imposed on technicians performing maintenance and inspection operations. The Space Shuttle was not expected to require the extensive maintenance it undergoes between flights. As a result, extensive, costly resources have been expended on workarounds and modifications to accommodate ground processing personnel. Consideration of basic human factors principles for design of maintenance is essential during the design phase of future space vehicles, facilities, and equipment. Simulation will be needed to test and validate designs before implementation.
43 CFR 404.40 - What is the non-Federal share of operation, maintenance, and replacement costs?
Code of Federal Regulations, 2010 CFR
2010-10-01
... Cost-Sharing § 404.40 What is the non-Federal share of operation, maintenance, and replacement costs? You are required to pay 100 percent of the operation, maintenance, and replacement costs of any rural... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false What is the non-Federal share of operation...
The construction of power grid operation index system considering the risk of maintenance
NASA Astrophysics Data System (ADS)
Tang, Jihong; Wang, Canlin; Jiang, Xinfan; Ye, Jianhui; Pan, Feilai
2018-02-01
In recent years, large-scale blackout occurred at home and abroad caused widespread concern about the operation of the grid in the world, and the maintenance risk is an important indicator of grid safety. The barrier operation of the circuit breaker exists in the process of overhaul of the power grid. The operation of the different barrier is of great significance to the change of the power flow, thus affecting the safe operation of the system. Most of the grid operating status evaluation index system did not consider the risk of maintenance, to this end, this paper from the security, economy, quality and cleanliness of the four angles, build the power grid operation index system considering the risk of maintenance.
Highway Maintenance Equipment Operator. Specialized Equipment. Training Materials.
ERIC Educational Resources Information Center
Perky, Sandra Dutreau; And Others
This curriculum guide provides instructional materials to assist in training equipment operators in the safe and effective use of highway maintenance equipment. It includes 18 units of instruction covering the large equipment used in maintenance operations. Each unit of instruction consists of eight basic components: performance objectives,…
Distributed Generation Energy Technology Operations and Maintenance Costs |
Costs Distributed Generation Energy Technology Operations and Maintenance Costs Transparent Cost Database Button The following charts indicate recent operations and maintenance (O&M) cost estimates available national-level cost data from a variety of sources. Costs in your specific location will vary. The
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-31
... otherwise lawful activities associated with operation, maintenance, and decommissioning of a 28-turbine wind... occur due to operation, maintenance, and decommissioning of 28 wind turbines. The proposed conservation... 21 years during operations, maintenance, and decommissioning activities related to CPP's 28-turbine...
18 CFR 346.2 - Material in support of initial rates or change in rates.
Code of Federal Regulations, 2014 CFR
2014-04-01
.... This statement must summarize the total cost of service for a carrier (operating and maintenance... in paragraphs (c) (2) through (7) of this section. (2) Statement B—operation and maintenance expense. This statement must set forth the operation, maintenance, administration and general, and depreciation...
18 CFR 346.2 - Material in support of initial rates or change in rates.
Code of Federal Regulations, 2012 CFR
2012-04-01
.... This statement must summarize the total cost of service for a carrier (operating and maintenance... in paragraphs (c) (2) through (7) of this section. (2) Statement B—operation and maintenance expense. This statement must set forth the operation, maintenance, administration and general, and depreciation...
18 CFR 346.2 - Material in support of initial rates or change in rates.
Code of Federal Regulations, 2011 CFR
2011-04-01
.... This statement must summarize the total cost of service for a carrier (operating and maintenance... in paragraphs (c) (2) through (7) of this section. (2) Statement B—operation and maintenance expense. This statement must set forth the operation, maintenance, administration and general, and depreciation...
18 CFR 346.2 - Material in support of initial rates or change in rates.
Code of Federal Regulations, 2013 CFR
2013-04-01
.... This statement must summarize the total cost of service for a carrier (operating and maintenance... in paragraphs (c) (2) through (7) of this section. (2) Statement B—operation and maintenance expense. This statement must set forth the operation, maintenance, administration and general, and depreciation...
25 CFR 39.1203 - Future consideration of contract school operation and maintenance funding.
Code of Federal Regulations, 2012 CFR
2012-04-01
... Future consideration of contract school operation and maintenance funding. The Assistant Secretary shall... 25 Indians 1 2012-04-01 2011-04-01 true Future consideration of contract school operation and maintenance funding. 39.1203 Section 39.1203 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR...
25 CFR 39.1203 - Future consideration of contract school operation and maintenance funding.
Code of Federal Regulations, 2010 CFR
2010-04-01
... Future consideration of contract school operation and maintenance funding. The Assistant Secretary shall... 25 Indians 1 2010-04-01 2010-04-01 false Future consideration of contract school operation and maintenance funding. 39.1203 Section 39.1203 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR...
25 CFR 39.1203 - Future consideration of contract school operation and maintenance funding.
Code of Federal Regulations, 2011 CFR
2011-04-01
... Future consideration of contract school operation and maintenance funding. The Assistant Secretary shall... 25 Indians 1 2011-04-01 2011-04-01 false Future consideration of contract school operation and maintenance funding. 39.1203 Section 39.1203 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR...
25 CFR 39.1203 - Future consideration of contract school operation and maintenance funding.
Code of Federal Regulations, 2014 CFR
2014-04-01
... Future consideration of contract school operation and maintenance funding. The Assistant Secretary shall... 25 Indians 1 2014-04-01 2014-04-01 false Future consideration of contract school operation and maintenance funding. 39.1203 Section 39.1203 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR...
25 CFR 39.1203 - Future consideration of contract school operation and maintenance funding.
Code of Federal Regulations, 2013 CFR
2013-04-01
... Future consideration of contract school operation and maintenance funding. The Assistant Secretary shall... 25 Indians 1 2013-04-01 2013-04-01 false Future consideration of contract school operation and maintenance funding. 39.1203 Section 39.1203 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR...
NASA Technical Reports Server (NTRS)
1985-01-01
The installation procedure, maintenance, adjustment and operation of a Lucas type fuel injection system for 13B rotary racing engine is outlined. Components of the fuel injection system and installation procedure and notes are described. Maintenance, adjustment, and operation are discussed.
32 CFR 553.13 - Standards of construction, maintenance, and operations.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 32 National Defense 3 2014-07-01 2014-07-01 false Standards of construction, maintenance, and operations. 553.13 Section 553.13 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY..., maintenance, and operations. The following standards of the Department of the Army will be observed in the...
25 CFR 39.1202 - Distribution of funds.
Code of Federal Regulations, 2010 CFR
2010-04-01
... determined by the percentage share which that school's fiscal year 1979 operation and maintenance cost represents in the total fiscal year 1979 operation and maintenance cost for all such schools. (b) To be... Contract School Operation and Maintenance Fund § 39.1202 Distribution of funds. (a) Each contract school...
[12th Annual] Maintenance & Operations Cost Study.
ERIC Educational Resources Information Center
Deriso, Jerald L.; Lane, C. Jerome
1983-01-01
Comparisons are shown between budgeted maintenance and operations costs for 1982-83 and the preceding two years' actual costs. Also provided is a summary of a 10-year comparison of net current expenditures per student, compared with maintenance and operations costs per student. Data are presented for 10 geographical regions. (MLF)
13th Annual Maintenance & Operations Cost Study.
ERIC Educational Resources Information Center
Deriso, Jerald L.
1984-01-01
Comparisons are drawn between budgeted maintenance and operations costs for 1983-84 and the preceding 2 years' actual costs. Also provided is a summary of a 10-year comparison of net current expenditures per student, compared with maintenance and operations costs per student. Data are presented for 10 geographical regions. (MLF)
Solar space and water heating system at Stanford University, Central Food Services Building
NASA Astrophysics Data System (ADS)
1980-05-01
This active hydronic domestic hot water and space heating system was 840 sq ft of single-glazed, liquid, flat plate collectors and 1550 gal heat storage tanks. The following are discussed: energy conservation, design philosophy, operation, acceptance testing, performance data, collector selection, bidding, costs, economics, problems, and recommendations. An operation and maintenance manual and as-built drawings are included in appendices.
Distributed operating system for NASA ground stations
NASA Technical Reports Server (NTRS)
Doyle, John F.
1987-01-01
NASA ground stations are characterized by ever changing support requirements, so application software is developed and modified on a continuing basis. A distributed operating system was designed to optimize the generation and maintenance of those applications. Unusual features include automatic program generation from detailed design graphs, on-line software modification in the testing phase, and the incorporation of a relational database within a real-time, distributed system.
Solar-energy heats a transportation test center--Pueblo, Colorado
NASA Technical Reports Server (NTRS)
1981-01-01
Petroleum-base, thermal energy transport fluid circulating through 583 square feet of flat-plate solar collectors accumulates majority of energy for space heating and domestic hot-water of large Test Center. Report describes operation, maintenance, and performance of system which is suitable for warehouses and similar buildings. For test period from February 1979 to January 1980, solar-heating fraction was 31 percent, solar hot-water fraction 79 percent.
20. SITE BUILDING 002 SCANNER BUILDING IN COMPUTER ...
20. SITE BUILDING 002 - SCANNER BUILDING - IN COMPUTER ROOM LOOKING AT "CONSOLIDATED MAINTENANCE OPERATIONS CENTER" JOB AREA AND OPERATION WORK CENTER. TASKS INCLUDE RADAR MAINTENANCE, COMPUTER MAINTENANCE, CYBER COMPUTER MAINTENANCE AND RELATED ACTIVITIES. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA
NASA Astrophysics Data System (ADS)
Buică, G.; Beiu, C.; Antonov, A.; Dobra, R.; Păsculescu, D.
2017-06-01
The protecting electrical equipment in use are subject to various factors generated by the use, maintenance, storage and working environment, which may change the characteristics of protection against electric shock. The study presents the results of research on the behaviour over time of protective characteristics of insulating covers of material of work equipment in use, in order to determine the type and periodicity of safety tests. There were tested and evaluated safety equipment with plastic and insulating rubber covers used in operations of verifying functionality, safety and maintenance of machinery used in manufacturing industries and specific services from electric, energy and food sector.
DOT National Transportation Integrated Search
2010-10-01
Transportation infrastructures are integral parts of a nations network connectivity. Largescale transportation projects represent major investments devoted to the construction, operation, and maintenance of facilities over an extended period. Typi...
DOT National Transportation Integrated Search
2010-10-01
Transportation infrastructures are integral parts of a nations network connectivity. Largescale : transportation projects represent major investments devoted to the construction, operation, : and maintenance of facilities over an extended period. ...
14 CFR 35.41 - Overspeed and overtorque.
Code of Federal Regulations, 2014 CFR
2014-01-01
... AIRWORTHINESS STANDARDS: PROPELLERS Tests and Inspections § 35.41 Overspeed and overtorque. (a) When the applicant seeks approval of a transient maximum propeller overspeed, the applicant must demonstrate that the propeller is capable of further operation without maintenance action at the maximum propeller overspeed...
14 CFR 35.41 - Overspeed and overtorque.
Code of Federal Regulations, 2012 CFR
2012-01-01
... AIRWORTHINESS STANDARDS: PROPELLERS Tests and Inspections § 35.41 Overspeed and overtorque. (a) When the applicant seeks approval of a transient maximum propeller overspeed, the applicant must demonstrate that the propeller is capable of further operation without maintenance action at the maximum propeller overspeed...
14 CFR 35.41 - Overspeed and overtorque.
Code of Federal Regulations, 2010 CFR
2010-01-01
... AIRWORTHINESS STANDARDS: PROPELLERS Tests and Inspections § 35.41 Overspeed and overtorque. (a) When the applicant seeks approval of a transient maximum propeller overspeed, the applicant must demonstrate that the propeller is capable of further operation without maintenance action at the maximum propeller overspeed...
14 CFR 35.41 - Overspeed and overtorque.
Code of Federal Regulations, 2011 CFR
2011-01-01
... AIRWORTHINESS STANDARDS: PROPELLERS Tests and Inspections § 35.41 Overspeed and overtorque. (a) When the applicant seeks approval of a transient maximum propeller overspeed, the applicant must demonstrate that the propeller is capable of further operation without maintenance action at the maximum propeller overspeed...
14 CFR 35.41 - Overspeed and overtorque.
Code of Federal Regulations, 2013 CFR
2013-01-01
... AIRWORTHINESS STANDARDS: PROPELLERS Tests and Inspections § 35.41 Overspeed and overtorque. (a) When the applicant seeks approval of a transient maximum propeller overspeed, the applicant must demonstrate that the propeller is capable of further operation without maintenance action at the maximum propeller overspeed...
46 CFR 199.190 - Operational readiness, maintenance, and inspection of lifesaving equipment.
Code of Federal Regulations, 2010 CFR
2010-10-01
... (CONTINUED) LIFESAVING APPLIANCES AND ARRANGEMENTS LIFESAVING SYSTEMS FOR CERTAIN INSPECTED VESSELS... manufacturer's handbook. (3) The general alarm system must be tested. (e) Monthly inspections. (1) Each...) Servicing of inflatable lifesaving appliances, inflated rescue boats, and marine evacuation systems. (1...
49 CFR 238.107 - Inspection, testing, and maintenance plan.
Code of Federal Regulations, 2010 CFR
2010-10-01
... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PASSENGER EQUIPMENT SAFETY STANDARDS Safety Planning and General..., the following provisions of this section apply to railroads operating Tier I passenger equipment covered by this part. A railroad may request earlier application of these requirements upon written...
Digital Data Recording System (DDRS) operating and maintenance manual
NASA Technical Reports Server (NTRS)
Griffin, C. R.; Jones, J. I.
1980-01-01
The digital data recording system (DDRS) was designed, fabricated, tested, and delivered. This unit is the interface between the synthetic aperture radar (SAR) and the recording system. The SAR data are formatted in the DDRS for data processing on the ground.
ERIC Educational Resources Information Center
Powell, Pamela, Ed.; Portugill, Jestyn, Ed.
This manual, one in a series developed for public education, provides information on smoke detector selection, installation, operation, and maintenance. For the prospective buyer, the importance of looking for the seal of a recognized national testing laboratory--such as Underwriters' Laboratories, Inc. (UL)--indicating adequate laboratory testing…
Certification and verification for Calmac flat plate solar collector
NASA Technical Reports Server (NTRS)
1978-01-01
Information used in the certification and verification of the Calmac Flat Plate Collector is presented. Contained are such items as test procedures and results, information on materials used, installation, operation, and maintenance manuals, and other information pertaining to the verification and certification.
Meeting the Customer's Needs for Mobility and Safety During Construction and Maintenance Operations
DOT National Transportation Integrated Search
2011-01-01
This report presents the Survey, Interviews, and Workshops Test Plan for the national evaluation of the Seattle/Lake Washington Corridor (LWC) Urban Partnership Agreement (UPA) under the United States Department of Transportation (U.S. DOT) UPA Progr...
Cocurrent scrubber evaluation TVA's Colbert Lime--Limestone Wet-Scrubbing Pilot Plant. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Robards, R.F.; Moore, N.D.; Kelso, T.M.
1979-01-01
The Tennessee Valley Authority (TVA) is actively engaged in a pilot plant program to develop and/or evaluate wet-scrubbing processes for removing sulfur dioxide (SO/sub 2/) from boiler flue gas. The physical size and general arrangement of flue gas scrubbing systems have a major impact on capital investment and operating cost, as do potential operating and maintenance advantages inherent to some systems. The equipment configuration for a cocurrent scrubber reflects some of these advantages. EPRI funded TVA to perform preliminary screening tests of TVA's 1 MW pilot plant (Colbert Steam Plant) to develop operating data on the cocurrent design for usemore » in designing and operating a 10 MW prototype cocurrent scrubber at TVA's Shawnee Scrubber Test Facility. Results of the Colbert tests showed excellent sulfur dioxide removal efficiencies, generally greater than 85%, low pressure drop, and high particulate removal efficiencies. This report covers these screening tests.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wang, Liping; Hong, Tianzhen
Almost half of the total energy used in the U.S. buildings is consumed by heating, ventilation and air conditionings (HVAC) according to EIA statistics. Among various driving factors to energy performance of building, operations and maintenance play a significant role. Many researches have been done to look at design efficiencies and operational controls for improving energy performance of buildings, but very few study the impacts of HVAC systems maintenance. Different practices of HVAC system maintenance can result in substantial differences in building energy use. If a piece of HVAC equipment is not well maintained, its performance will degrade. If sensorsmore » used for control purpose are not calibrated, not only building energy usage could be dramatically increased, but also mechanical systems may not be able to satisfy indoor thermal comfort. Properly maintained HVAC systems can operate efficiently, improve occupant comfort, and prolong equipment service life. In the paper, maintenance practices for HVAC systems are presented based on literature reviews and discussions with HVAC engineers, building operators, facility managers, and commissioning agents. We categorize the maintenance practices into three levels depending on the maintenance effort and coverage: 1) proactive, performance-monitored maintenance; 2) preventive, scheduled maintenance; and 3) reactive, unplanned or no maintenance. A sampled list of maintenance issues, including cooling tower fouling, boiler/chiller fouling, refrigerant over or under charge, temperature sensor offset, outdoor air damper leakage, outdoor air screen blockage, outdoor air damper stuck at fully open position, and dirty filters are investigated in this study using field survey data and detailed simulation models. The energy impacts of both individual maintenance issue and combined scenarios for an office building with central VAV systems and central plant were evaluated by EnergyPlus simulations using three approaches: 1) direct modeling with EnergyPlus, 2) using the energy management system feature of EnergyPlus, and 3) modifying EnergyPlus source code. The results demonstrated the importance of maintenance for HVAC systems on energy performance of buildings. The research is intended to provide a guideline to help practitioners and building operators to gain the knowledge of maintaining HVAC systems in efficient operations, and prioritize HVAC maintenance work plan. The paper also discusses challenges of modeling building maintenance issues using energy simulation programs.« less
Development of a turbojet engine gearbox test rig for prognostics and health management
NASA Astrophysics Data System (ADS)
Rezaei, Aida; Dadouche, Azzedine
2012-11-01
Aircraft engine gearboxes represent one of the many critical systems/elements that require special attention for longer and safer operation. Reactive maintenance strategies are unsuitable as they usually imply higher repair costs when compared to condition based maintenance. This paper discusses the main prognostics and health management (PHM) approaches, describes a newly designed gearbox experimental facility and analyses preliminary data for gear prognosis. The test rig is designed to provide full capabilities of performing controlled experiments suitable for developing a reliable diagnostic and prognostic system. The rig is based on the accessory gearbox of the GE J85 turbojet engine, which has been slightly modified and reconfigured to replicate real operating conditions such as speeds and loads. Defect to failure tests (DTFT) have been run to evaluate the performance of the rig as well as to assess prognostic metrics extracted from sensors installed on the gearbox casing (vibration and acoustic). The paper also details the main components of the rig and describes the various challenges encountered. Successful DTFT results were obtained during an idle engine performance test and prognostic metrics associated with the sensor suite were evaluated and discussed.
An efficiency-decay model for Lumen maintenance
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bobashev, Georgiy; Baldasaro, Nicholas G.; Mills, Karmann C.
Proposed is a multicomponent model for the estimation of light-emitting diode (LED) lumen maintenance using test data that were acquired in accordance with the test standards of the Illumination Engineering Society of North America, i.e., LM-80-08. Lumen maintenance data acquired with this test do not always follow exponential decay, particularly data collected in the first 1000 h or under low-stress (e.g., low temperature) conditions. This deviation from true exponential behavior makes it difficult to use the full data set in models for the estimation of lumen maintenance decay coefficient. As a result, critical information that is relevant to the earlymore » life or low-stress operation of LED light sources may be missed. We present an efficiency-decay model approach, where all lumen maintenance data can be used to provide an alternative estimate of the decay rate constant. The approach considers a combined model wherein one part describes an initial “break-in” period and another part describes the decay in lumen maintenance. During the break-in period, several mechanisms within the LED can act to produce a small (typically <; 10%) increase in luminous flux. The effect of the break-in period and its longevity is more likely to be present at low-ambient temperatures and currents, where the discrepancy between a standard TM-21 approach and our proposed model is the largest. For high temperatures and currents, the difference between the estimates becomes nonsubstantial. Finally, our approach makes use of all the collected data and avoids producing unrealistic estimates of the decay coefficient.« less
An efficiency-decay model for Lumen maintenance
Bobashev, Georgiy; Baldasaro, Nicholas G.; Mills, Karmann C.; ...
2016-08-25
Proposed is a multicomponent model for the estimation of light-emitting diode (LED) lumen maintenance using test data that were acquired in accordance with the test standards of the Illumination Engineering Society of North America, i.e., LM-80-08. Lumen maintenance data acquired with this test do not always follow exponential decay, particularly data collected in the first 1000 h or under low-stress (e.g., low temperature) conditions. This deviation from true exponential behavior makes it difficult to use the full data set in models for the estimation of lumen maintenance decay coefficient. As a result, critical information that is relevant to the earlymore » life or low-stress operation of LED light sources may be missed. We present an efficiency-decay model approach, where all lumen maintenance data can be used to provide an alternative estimate of the decay rate constant. The approach considers a combined model wherein one part describes an initial “break-in” period and another part describes the decay in lumen maintenance. During the break-in period, several mechanisms within the LED can act to produce a small (typically <; 10%) increase in luminous flux. The effect of the break-in period and its longevity is more likely to be present at low-ambient temperatures and currents, where the discrepancy between a standard TM-21 approach and our proposed model is the largest. For high temperatures and currents, the difference between the estimates becomes nonsubstantial. Finally, our approach makes use of all the collected data and avoids producing unrealistic estimates of the decay coefficient.« less
Office of the Under Secretary of Defense (Comptroller)
Estimates for FY 2019 (Green Book) PDF icon Excel icon (Zip File) Operations and Maintenance Overview Operation and Maintenance Overview PDF icon Budget Documents Military Personnel Programs (M-1) PDF icon Excel icon - Budget Appendix Display (M-1) Excel icon Operation and Maintenance Programs (O-1) PDF icon
ERIC Educational Resources Information Center
California State Univ., Sacramento. Dept. of Civil Engineering.
Proper installations, inspections, operations, maintenance and repairs of wastewater collection, conveyance and treatment facilities have a significant impact on the operation and maintenance costs, and the effectiveness of these facilities. This manual is the first volume of a two-part program designed to provide wastewater collection system…
38th Annual Maintenance & Operations Cost Study for Colleges
ERIC Educational Resources Information Center
Agron, Joe
2009-01-01
The nation's colleges are feeling the pinch of the economic downturn, and maintenance and operations (M&O) budgets especially are under pressure. This article presents data from the 38th annual Maintenance & Operations Cost Study for colleges that can help one in benchmarking expenditures at one's institution. Data provided only targets two-year…
38th Annual Maintenance & Operations Cost Study for Schools
ERIC Educational Resources Information Center
Agron, Joe
2009-01-01
Despite the worst economic environment in generations, spending by K-12 institutions on maintenance and operations (M&O) held its own--defying historical trends that have shown M&O spending among the most affected in times of budget tightening. This article presents data from the 38th annual Maintenance & Operations Cost Study for…
43 CFR 426.23 - Recovery of operation and maintenance (O&M) costs.
Code of Federal Regulations, 2010 CFR
2010-10-01
... operation and maintenance (O&M) costs. (a) General. All new, amended, and renewed contracts shall provide... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Recovery of operation and maintenance (O&M) costs. 426.23 Section 426.23 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF...
34 CFR 75.615 - Operation and maintenance by the grantee.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 34 Education 1 2014-07-01 2014-07-01 false Operation and maintenance by the grantee. 75.615 Section 75.615 Education Office of the Secretary, Department of Education DIRECT GRANT PROGRAMS What Conditions Must Be Met by a Grantee? Construction § 75.615 Operation and maintenance by the grantee. A...
Development, Maintenance & Operation - Computer Hardware & Software No Picture Jim Alessi - Group , Maintenance & Operation No Picture Bob Eich - Accelerator Operator No Picture Irv Feigenbaum (Retired
Operational Interventions to Maintenance Error
NASA Technical Reports Server (NTRS)
Kanki, Barbara G.; Walter, Diane; Dulchinos, VIcki
1997-01-01
A significant proportion of aviation accidents and incidents are known to be tied to human error. However, research of flight operational errors has shown that so-called pilot error often involves a variety of human factors issues and not a simple lack of individual technical skills. In aircraft maintenance operations, there is similar concern that maintenance errors which may lead to incidents and accidents are related to a large variety of human factors issues. Although maintenance error data and research are limited, industry initiatives involving human factors training in maintenance have become increasingly accepted as one type of maintenance error intervention. Conscientious efforts have been made in re-inventing the team7 concept for maintenance operations and in tailoring programs to fit the needs of technical opeRAtions. Nevertheless, there remains a dual challenge: 1) to develop human factors interventions which are directly supported by reliable human error data, and 2) to integrate human factors concepts into the procedures and practices of everyday technical tasks. In this paper, we describe several varieties of human factors interventions and focus on two specific alternatives which target problems related to procedures and practices; namely, 1) structured on-the-job training and 2) procedure re-design. We hope to demonstrate that the key to leveraging the impact of these solutions comes from focused interventions; that is, interventions which are derived from a clear understanding of specific maintenance errors, their operational context and human factors components.
Reduction of Maintenance Error Through Focused Interventions
NASA Technical Reports Server (NTRS)
Kanki, Barbara G.; Walter, Diane; Rosekind, Mark R. (Technical Monitor)
1997-01-01
It is well known that a significant proportion of aviation accidents and incidents are tied to human error. In flight operations, research of operational errors has shown that so-called "pilot error" often involves a variety of human factors issues and not a simple lack of individual technical skills. In aircraft maintenance operations, there is similar concern that maintenance errors which may lead to incidents and accidents are related to a large variety of human factors issues. Although maintenance error data and research are limited, industry initiatives involving human factors training in maintenance have become increasingly accepted as one type of maintenance error intervention. Conscientious efforts have been made in re-inventing the "team" concept for maintenance operations and in tailoring programs to fit the needs of technical operations. Nevertheless, there remains a dual challenge: to develop human factors interventions which are directly supported by reliable human error data, and to integrate human factors concepts into the procedures and practices of everyday technical tasks. In this paper, we describe several varieties of human factors interventions and focus on two specific alternatives which target problems related to procedures and practices; namely, 1) structured on-the-job training and 2) procedure re-design. We hope to demonstrate that the key to leveraging the impact of these solutions comes from focused interventions; that is, interventions which are derived from a clear understanding of specific maintenance errors, their operational context and human factors components.
Testing of sealed lead-acid batteries
NASA Astrophysics Data System (ADS)
Bush, D. M.; Sealey, J. D.; Miller, D. W.
1984-02-01
Sealed lead acid batteries under development were tested. The goal was to develop a totally maintenance free sealed lead acid battery capable of deep discharge operation in a photovoltaic power system. Sealed lead acid batteries and a group of conventional, flooded lead acid batteries were exposed to a matrix test plan, with some approaching 1000 cycles. This performance was achieved with the standard National Electrical Manufacturers' Association cycle test, and the partial state of charge cycle test. Modes of failure are investigated.
NASA Astrophysics Data System (ADS)
Kim, S.; Adams, D. E.; Sohn, H.
2013-01-01
As the wind power industry has grown rapidly in the recent decade, maintenance costs have become a significant concern. Due to the high repair costs for wind turbine blades, it is especially important to detect initial blade defects before they become structural failures leading to other potential failures in the tower or nacelle. This research presents a method of detecting cracks on wind turbine blades using the Vibo-Acoustic Modulation technique. Using Vibro-Acoustic Modulation, a crack detection test is conducted on a WHISPER 100 wind turbine in its operating environment. Wind turbines provide the ideal conditions in which to utilize Vibro-Acoustic Modulation because wind turbines experience large structural vibrations. The structural vibration of the wind turbine balde was used as a pumping signal and a PZT was used to generate the probing signal. Because the non-linear portion of the dynamic response is more sensitive to the presence of a crack than the environmental conditions or operating loads, the Vibro-Acoustic Modulation technique can provide a robust structural health monitoring approach for wind turbines. Structural health monitoring can significantly reduce maintenance costs when paired with predictive modeling to minimize unscheduled maintenance.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-26
... Maintenance Manual (AMM) includes chapters 05-10 ``Time Limits'', 05-15 ``Critical Design Configuration... 05, ``Time Limits/Maintenance Checks,'' of BAe 146 Series/AVRO 146-RJ Series Aircraft Maintenance... Chapter 05, ``Time Limits/ Maintenance Checks,'' of the BAE SYSTEMS (Operations) Limited BAe 146 Series...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Eudy, L.; Chandler, K.
2010-06-01
This is an evaluation of hydrogen fuel cell transit buses operating at AC Transit in revenue service since March 20, 2006, comparing similar diesel buses operating from the same depot. It covers November 2007 through February 2010. Results include implementation experience, fueling station operation, evaluation results at AC Transit (bus usage, availability, fuel economy, maintenance costs, and road calls), and a summary of achievements and challenges encountered during the demonstration.
NASA Astrophysics Data System (ADS)
Madding, Robert P.
1999-03-01
For years predictive maintenance thermographers have been challenged by industrial targets to determine whether they had a problem, and if they did how big was it. We have struggled with low emissivity and unknown emissivity targets. We have observed thermal patterns and temperatures and asked whether the target was operating normally or if the heat patterns indicated a problem condition. Through years of experience, we have built a body of knowledge. Conferences such as Thermosense are where we share that knowledge with others. From this, we realize that much more could be done if our targets were thermographer-friendly. Now it is time to ask the equipment manufacturers to step up to the plate and acknowledge the viability of thermography as a predictive maintenance and non-destructive test tool. They build the targets we look at. They can help us in a least three areas: (1) We need to work with them to specify a baseline thermal signature for their equipment operating under normal conditions. Thermograms would be included with the operating manual or equipment test results. Thermography would be part of acceptance and installation testing. (2) We need to ask them to include high emissivity coatings in their designs for certain targets. (3) We need to work with them to develop thermal models that will indicate thermal signatures under all types of environmental conditions for both normal and abnormal operation. Thermal modeling programs developed by the defense community that will display a surface thermal image are available for PCs. With the help of target equipment manufacturers, we can significantly advance the state-of-the- art of thermography applications. We can be even more confident of our recommendations. We can evaluate targets that couldn't be evaluated before, expanding our applications. We can have backup on criticality calls with manufacturers' data. In short, we can do our job better.
Study of emissions from light-duty vehicles in Denver. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1981-08-31
A sample of 300 light-duty vehicles normally operated in the Denver metropolitan area was tested for emissions and fuel economy. The vehicles were from the 1978 through 1982 model years and included both passenger cars and light-duty trucks. One purpose of the program was to gather information for calculations and projections of ambient air quality. Another purpose was to assemble data on current model year vehicles for use in the support of Inspection/Maintenance and other regulatory programs. The vehicles were tested for exhaust emissions utilizing the Federal Test Procedure, the Highway Fuel Economy Test (HFET), and four short mode tests.more » 125 vehicles from the 1980-82 model years received an evaporative emission test using the sealed housing evaporative determination (SHED) technique. Other actions were taken in relation to each vehicle tested. These included an engine and emission control system maladjustment/disablement and status inspection, driveability evaluations, and owner interviews to obtain vehicle maintenance and usage data.« less
Artificial intelligence for turboprop engine maintenance
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-01-01
Long-term maintenance operations, causing the unit to out of action, may seem economical - but they result in reduced operating readiness. Offsetting that concern, careless, hurried maintenance reduces margins of safety and reliability. Any tool that improves maintenance without causing a sharp increase in cost is valuable. Artificial intelligence (AI) is one of the tools. Expert system and neural networks are two different areas of AI that show promise for turboprop engine maintenance.
Development and evaluation of thermoplastic street maintenance material
NASA Technical Reports Server (NTRS)
Siemens, W. D.
1973-01-01
An all-weather permanent street patching material was investigated for flexible and rigid pavements. The economic, operational, and material requirements are discussed along with the results of field tests with various mixtures of EVA resins and asphalt. Cost analyses for thermoplastic patching methods are included.
10 CFR 50.55a - Codes and standards.
Code of Federal Regulations, 2014 CFR
2014-01-01
..., standard design approval, and standard design certification application under part 52 of this chapter is..., and components must be designed, fabricated, erected, constructed, tested, and inspected to quality... Operation and Maintenance of Nuclear Power Plants; NRC Regulatory Guide (RG) 1.84, Revision 35, “Design...
Effects of extended lay-off periods on performance and operator trust under adaptable automation.
Chavaillaz, Alain; Wastell, David; Sauer, Jürgen
2016-03-01
Little is known about the long-term effects of system reliability when operators do not use a system during an extended lay-off period. To examine threats to skill maintenance, 28 participants operated twice a simulation of a complex process control system for 2.5 h, with an 8-month retention interval between sessions. Operators were provided with an adaptable support system, which operated at one of the following reliability levels: 60%, 80% or 100%. Results showed that performance, workload, and trust remained stable at the second testing session, but operators lost self-confidence in their system management abilities. Finally, the effects of system reliability observed at the first testing session were largely found again at the second session. The findings overall suggest that adaptable automation may be a promising means to support operators in maintaining their performance at the second testing session. Copyright © 2015 Elsevier Ltd and The Ergonomics Society. All rights reserved.
Solar space- and water-heating system at Stanford University. Central Food Services Building
NASA Astrophysics Data System (ADS)
1980-05-01
The closed-loop drain-back system is described as offering dependability of gravity drain-back freeze protection, low maintenance, minimal costs, and simplicity. The system features an 840 square-foot collector and storage capacity of 1550 gallons. The acceptance testing and the predicted system performance data are briefly described. Solar performance calculations were performed using a computer design program (FCHART). Bidding, costs, and economics of the system are reviewed. Problems are discussed and solutions and recommendations given. An operation and maintenance manual is given.
Operation and maintenance, fire rescue air-pack. Volume 2: Communications
NASA Technical Reports Server (NTRS)
1972-01-01
The operation and maintenance procedures are described for the development model of the fire rescue air pack (FRAP) voice amplifier assembly, including the battery charger. Operational instructions include a general description of the assembly, specifications, and installation and operation. Maintenance instructions include theory of operation, preventive maintenance, repair, adjustment, and a parts list. The FRAP is intended to permit fire rescue personnel to enter a smoke-filled, toxic or oxygen depleted environment carrying their own source of breathing air. The voice amplifier assembly permits the wearer to communicate by voice with other persons in the vicinity. The battery charger assembly provides a means of keeping the amplifier batteries fully charged.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Royer, Michael P.; McCullough, Jeffrey J.; Tucker, Joseph C.
The lumen depreciation and color shift of 17 different A lamps (15 LED, 1 CFL, 1 halogen) was monitored in the automated long-term test apparatus (ALTA) for more than 7,500 hours. Ten samples of each lamp model were tested, with measurements recorded on a weekly basis. The lamps were operated continuously at an ambient temperature of 45°C (-1°C). Importantly, the steady-state test conditions were not optimized for inducing catastrophic failure for any of the lamp technologies—to which thermal cycling is a strong contributor— and are not typical of normal use patterns—which usually include off periods where the lamp cools down.more » Further, the test conditions differ from those used in standardized long-term test methods (i.e., IES LM-80, IES LM-84), so the results should not be directly compared. On the other hand, the test conditions are similar to those used by ENERGY STAR (when elevated temperature testing is called for). Likewise, the conditions and assumptions used by manufacturers to generated lifetime claims may vary; the CALiPER long-term data is informative, but cannot necessarily be used to discredit manufacturer claims. The test method used for this investigation should be interpreted as one more focused on the long-term effects of elevated temperature operation, at an ambient temperature that is not uncommon in luminaires. On average, the lumen maintenance of the LED lamps monitored in the ALTA was better than benchmark lamps, but there was considerable variation from lamp model to lamp model. While three lamp models had average lumen maintenance above 99% at the end of the study period, two products had average lumen maintenance below 65%, constituting a parametric failure. These two products, along with a third, also exhibited substantial color shift, another form of parametric failure. While none of the LED lamps exhibited catastrophic failure—and all of the benchmarks did—the early degradation of performance is concerning, especially with a new technology trying to build a reputation with consumers. Beyond the observed parametric failures nearly half of the products failed to meet early-life thresholds for lumen maintenance, which were borrowed from ENERGY STAR specifications. That is, the lumen maintenance was sufficiently low at 6,000 hours that seven of the products are unlikely to have lumen maintenance above 70% at their rated lifetime (which was usually 25,000 hours). Given the methods used for this investigation—most notably continuous operation—the results should not be interpreted as indicative of a lamp’s performance in a typical environment. Likewise, these results are not directly relatable to manufacturer lifetime claims. This report is best used to understand the variation in LED product performance, compare the robustness of LED lamps and benchmark conventional lamps, and understand the characteristics of lumen and chromaticity change. A key takeaway is that the long-term performance of LED lamps can vary greatly from model to model (i.e., the technology is not homogenous), although the lamp-to-lamp consistency within a given model is relatively good. Further, operation of LED lamps in an enclosed luminaire (or otherwise in high ambient temperatures), can induce parametric failure of LEDs much earlier than their rated lifetime; manufacturer warnings about such conditions should be followed if performance degradation is unacceptable.« less
RTEMS Centre - Support and Maintenance Centre to RTEMS Operating System
NASA Astrophysics Data System (ADS)
Silva, H.; Constantino, A.; Freitas, D.; Coutinho, M.; Faustino, S.; Mota, M.; Colaço, P.; Sousa, J.; Dias, L.; Damjanovic, B.; Zulianello, M.; Rufino, J.
2009-05-01
RTEMS CENTRE - Support and Maintenance Centre to RTEMS Operating System is a joint ESA/Portuguese Task Force initiative to develop a support and maintenance centre to the Real-Time Executive for Multiprocessor Systems (RTEMS). This paper gives a high level visibility of the progress, the results obtained and the future work in the RTEMS CENTRE [6] and in the RTEMS Improvement [7] projects. RTEMS CENTRE started officially in November 2006, with the RTEMS 4.6.99.2 version. A full analysis of RTEMS operating system was produced. The architecture was analysed in terms of conceptual, organizational and operational concepts. The original objectives [1] of the centre were primarily to create and maintain technical expertise and competences in this RTOS, to develop a website to provide the European Space Community an entry point for obtaining support (http://rtemscentre.edisoft.pt), to design, develop, maintain and integrate some RTEMS support tools (Timeline Tool, Configuration and Management Tools), to maintain flight libraries and Board Support Packages, to develop a strong relationship with the World RTEMS Community and finally to produce some considerations in ARINC-653, DO-178B and ECSS E-40 standards. RTEMS Improvement is the continuation of the RTEMS CENTRE. Currently the RTEMS, version 4.8.0, is being facilitated for a future qualification. In this work, the validation material is being produced following the Galileo Software Standards Development Assurance Level B [5]. RTEMS is being completely tested, errors analysed, dead and deactivated code removed and tests produced to achieve 100% statement and decision coverage of source code [2]. The SW to exploit the LEON Memory Management Unit (MMU) hardware will be also added. A brief description of the expected implementations will be given.
Orbit transfer rocket engine technology program
NASA Technical Reports Server (NTRS)
Gustafson, N. B.; Harmon, T. J.
1993-01-01
An advanced near term (1990's) space-based Orbit Transfer Vehicle Engine (OTVE) system was designed, and the technologies applicable to its construction, maintenance, and operations were developed under Tasks A through F of the Orbit Transfer Rocket Engine Technology Program. Task A was a reporting task. In Task B, promising OTV turbomachinery technologies were explored: two stage partial admission turbines, high velocity ratio diffusing crossovers, soft wear ring seals, advanced bearing concepts, and a rotordynamic analysis. In Task C, a ribbed combustor design was developed. Possible rib and channel geometries were chosen analytically. Rib candidates were hot air tested and laser velocimeter boundary layer analyses were conducted. A channel geometry was also chosen on the basis of laser velocimeter data. To verify the predicted heat enhancement effects, a ribbed calorimeter spool was hot fire tested. Under Task D, the optimum expander cycle engine thrust, performance and envelope were established for a set of OTV missions. Optimal nozzle contours and quick disconnects for modularity were developed. Failure Modes and Effects Analyses, maintenance and reliability studies and component study results were incorporated into the engine system. Parametric trades on engine thrust, mixture ratio, and area ratio were also generated. A control system and the health monitoring and maintenance operations necessary for a space-based engine were outlined in Task E. In addition, combustor wall thickness measuring devices and a fiberoptic shaft monitor were developed. These monitoring devices were incorporated into preflight engine readiness checkout procedures. In Task F, the Integrated Component Evaluator (I.C.E.) was used to demonstrate performance and operational characteristics of an advanced expander cycle engine system and its component technologies. Sub-system checkouts and a system blowdown were performed. Short transitions were then made into main combustor ignition and main stage operation.
Code of Federal Regulations, 2011 CFR
2011-04-01
... maintenance assessment rate for the irrigation facility servicing my farm unit? 171.500 Section 171.500 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER IRRIGATION OPERATION AND... annual operation and maintenance assessment rate for the irrigation facility servicing my farm unit? (a...
Guide for preparing active solar heating systems operation and maintenance manuals
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1991-01-01
This book presents a systematic and standardized approach to the preparation of operation and maintenance manuals for active solar heating systems. Provides an industry consensus of the best operating and maintenance procedures for large commercial-scale solar service water and space heating systems. A sample O M manual is included. 3-ring binder included.
36th Annual Maintenance & Operations Cost Study: Schools
ERIC Educational Resources Information Center
Agron, Joe
2007-01-01
Spending by school districts on maintenance and operations increased in 2006-2007, reversing years of historic low expenditures. According to "American School & University's" 36th annual Maintenance and Operations (M&O) Cost Study, the median school district spends 9.19% of total district expenditures (TDE) on M&O, up from 7.58% the year before.…
Test plan. GCPS task 7, subtask 7.1: IHM development
NASA Technical Reports Server (NTRS)
Greenberg, H. S.
1994-01-01
The overall objective of Task 7 is to identify cost-effective life cycle integrated health management (IHM) approaches for a reusable launch vehicle's primary structure. Acceptable IHM approaches must: eliminate and accommodate faults through robust designs, identify optimum inspection/maintenance periods, automate ground and on-board test and check-out, and accommodate and detect structural faults by providing wide and localized area sensor and test coverage as required. These requirements are elements of our targeted primary structure low cost operations approach using airline-like maintenance by exception philosophies. This development plan will follow an evolutionary path paving the way to the ultimate development of flight-quality production, operations, and vehicle systems. This effort will be focused on maturing the recommended sensor technologies required for localized and wide area health monitoring to a technology readiness level (TRL) of 6 and to establish flight ready system design requirements. The following is a brief list of IHM program objectives: design out faults by analyzing material properties, structural geometry, and load and environment variables and identify failure modes and damage tolerance requirements; design in system robustness while meeting performance objectives (weight limitations) of the reusable launch vehicle primary structure; establish structural integrity margins to preclude the need for test and checkout and predict optimum inspection/maintenance periods through life prediction analysis; identify optimum fault protection system concept definitions combining system robustness and integrity margins established above with cost effective health monitoring technologies; and use coupons, panels, and integrated full scale primary structure test articles to identify, evaluate, and characterize the preferred NDE/NDI/IHM sensor technologies that will be a part of the fault protection system.
Validation of Helicopter Gear Condition Indicators Using Seeded Fault Tests
NASA Technical Reports Server (NTRS)
Dempsey, Paula; Brandon, E. Bruce
2013-01-01
A "seeded fault test" in support of a rotorcraft condition based maintenance program (CBM), is an experiment in which a component is tested with a known fault while health monitoring data is collected. These tests are performed at operating conditions comparable to operating conditions the component would be exposed to while installed on the aircraft. Performance of seeded fault tests is one method used to provide evidence that a Health Usage Monitoring System (HUMS) can replace current maintenance practices required for aircraft airworthiness. Actual in-service experience of the HUMS detecting a component fault is another validation method. This paper will discuss a hybrid validation approach that combines in service-data with seeded fault tests. For this approach, existing in-service HUMS flight data from a naturally occurring component fault will be used to define a component seeded fault test. An example, using spiral bevel gears as the targeted component, will be presented. Since the U.S. Army has begun to develop standards for using seeded fault tests for HUMS validation, the hybrid approach will be mapped to the steps defined within their Aeronautical Design Standard Handbook for CBM. This paper will step through their defined processes, and identify additional steps that may be required when using component test rig fault tests to demonstrate helicopter CI performance. The discussion within this paper will provide the reader with a better appreciation for the challenges faced when defining a seeded fault test for HUMS validation.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-07-01
This paper reports on the questions: should Congress provide more funds for the Air Force's current plan---the CORE program---to upgrade the B-1B defense avionics system In GAO's view, more testing of the system is not necessary to determine whether to implement the CORE program. Flight testing has shown that the CORE modifications would provide similar operational capabilities to, and offer some survivability improvements over, the existing defense avionics system. The only reason for additional testing would be to prove that some problems with the maintenance diagnostic system has been resolved. Initial testing revealed that while some improvements were achieved, usermore » requirements were not met for such things as low false alarm rates and cannot duplicate rates. Even if the maintenance diagnostic capabilities were fully demonstrated, however, the CORE system should not be implemented until it is known whether the defense avionics system design can support the B-1B's new role as a conventional bomber.« less
Paranal maintenance and CMMS experience
NASA Astrophysics Data System (ADS)
Montano, Nelson
2004-10-01
During the last four years of operations, low technical downtime has been one of the relevant records of the Paranal Observatory. From the beginning of the Very Large Telescope (VLT) project, European Southern Observatory (ESO) has considered the implementation of a proper maintenance strategy a fundamental point in order to ensure low technical down time and preserve the Observatory's assets. The implementation of the maintenance strategy was based on the following aspects: - Strong maintenance sense during the design stage. Line Replacement Unit (LRU) concept, standardization and modularity of the Observatory equipment - Creation of a dedicated team for Maintenance - The implementation of a Computerized Maintenance Management System After four operational years, the result of these aspects has exceeded the expectations; the Observatory has been operating with high availability under a sustainable strategy. The strengths of the maintenance strategy have been based on modern maintenance concepts applied by regular production companies, where any minute of down time involves high cost. The operation of the actual Paranal Maintenance System is based mainly on proactive activities, such as regular inspections, preventive maintenance (PM) and predictive maintenance (PdM) plans. Nevertheless, it has been necessary to implement a strong plan for corrective maintenance (CM). The Spare Parts Strategy has also been an important point linked to the Maintenance Strategy and CMMS implementation. At present, almost 4,000 items related to the Observatory spare parts are loaded into the CMMS database. Currently, we are studying the implementation of a Reliability Centered Maintenance (RCM) project in one of our critical systems The following document presents the actual status of the Paranal Maintenance Strategy and which have been the motivations to implement the established strategy.
Design and Field Test of a WSN Platform Prototype for Long-Term Environmental Monitoring
Lazarescu, Mihai T.
2015-01-01
Long-term wildfire monitoring using distributed in situ temperature sensors is an accurate, yet demanding environmental monitoring application, which requires long-life, low-maintenance, low-cost sensors and a simple, fast, error-proof deployment procedure. We present in this paper the most important design considerations and optimizations of all elements of a low-cost WSN platform prototype for long-term, low-maintenance pervasive wildfire monitoring, its preparation for a nearly three-month field test, the analysis of the causes of failure during the test and the lessons learned for platform improvement. The main components of the total cost of the platform (nodes, deployment and maintenance) are carefully analyzed and optimized for this application. The gateways are designed to operate with resources that are generally used for sensor nodes, while the requirements and cost of the sensor nodes are significantly lower. We define and test in simulation and in the field experiment a simple, but effective communication protocol for this application. It helps to lower the cost of the nodes and field deployment procedure, while extending the theoretical lifetime of the sensor nodes to over 16 years on a single 1 Ah lithium battery. PMID:25912349
A Measure of Maintenance Training/Qualification Readiness and Its Impact on Billet Life Cycle Coast.
1983-09-01
MAINTENANCE READINESS ESTIMATION---------------- 24 A. AVIATION TRAINING SUPPORT SYSTEM ---- 25 B. MAINTENANCE MATRIX UTILIZATION-------------- 27 C...nonexistent follow-on training programs. CRef. 13 The operation and maintenance o systems account for a major portion of system life cycle cost. Studies of... systems annual support costs show that manpower consistently consuwme over half of the funds appropriated for operation and maintenance of the system £Ref
Intelligent Operation and Maintenance of Micro-grid Technology and System Development
NASA Astrophysics Data System (ADS)
Fu, Ming; Song, Jinyan; Zhao, Jingtao; Du, Jian
2018-01-01
In order to achieve the micro-grid operation and management, Studying the micro-grid operation and maintenance knowledge base. Based on the advanced Petri net theory, the fault diagnosis model of micro-grid is established, and the intelligent diagnosis and analysis method of micro-grid fault is put forward. Based on the technology, the functional system and architecture of the intelligent operation and maintenance system of micro-grid are studied, and the microcomputer fault diagnosis function is introduced in detail. Finally, the system is deployed based on the micro-grid of a park, and the micro-grid fault diagnosis and analysis is carried out based on the micro-grid operation. The system operation and maintenance function interface is displayed, which verifies the correctness and reliability of the system.
Solar heater/cooler for mass market
NASA Technical Reports Server (NTRS)
1981-01-01
Electrical energy consumption is reduced by half for 2 1/2 story office building. 138 liquid flat plate solar collectors are mounted on building roof, which faces nearly due south. Final project report includes detailed drawings and photographs, operation and maintenance manual, acceptance test plan, and related information.
10 CFR 70.64 - Requirements for new facilities or new processes at existing facilities.
Code of Federal Regulations, 2010 CFR
2010-01-01
... explosions. (4) Environmental and dynamic effects. The design must provide for adequate protection from environmental conditions and dynamic effects associated with normal operations, maintenance, testing, and... design must provide for inclusion of instrumentation and control systems to monitor and control the...
49 CFR 236.923 - Task analysis and basic requirements.
Code of Federal Regulations, 2013 CFR
2013-10-01
..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Standards for Processor-Based Signal and Train Control Systems § 236.923 Task analysis and basic requirements..., inspection, testing, and operating tasks that must be performed on a railroad's products. This includes the...
49 CFR 236.923 - Task analysis and basic requirements.
Code of Federal Regulations, 2014 CFR
2014-10-01
..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Standards for Processor-Based Signal and Train Control Systems § 236.923 Task analysis and basic requirements..., inspection, testing, and operating tasks that must be performed on a railroad's products. This includes the...
49 CFR 236.923 - Task analysis and basic requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Standards for Processor-Based Signal and Train Control Systems § 236.923 Task analysis and basic requirements..., inspection, testing, and operating tasks that must be performed on a railroad's products. This includes the...
49 CFR 236.923 - Task analysis and basic requirements.
Code of Federal Regulations, 2012 CFR
2012-10-01
..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Standards for Processor-Based Signal and Train Control Systems § 236.923 Task analysis and basic requirements..., inspection, testing, and operating tasks that must be performed on a railroad's products. This includes the...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Curley, C.C.; Overas, A.J.
1976-01-01
The design and performance of the variable-pitch axial-flow forced-draft and induced-draft fans used in two 820MW generating units at the Martins Creek Power Plant are described. Information is included on fan design; silencers; mechanical and metallurgical testing; insulation; performance testing; start-up and shutdown procedures; and maintenance. (LCL)
Long-Term Implications of the 2016 Future Years Defense Program
2016-01-01
operation and maintenance activities; acquisition includes research, development, test, and evaluation as well as procurement of weapon systems and other...group includes procurement and research, development, test, and evaluation (RDT&E). Appropriations for procurement fund the purchase of new weapon...and Evaluation Military Construction Family Housing OCO Funding Actual FYDP Period Beyond the FYDP PeriodDoD’s Estimates For 2017 through 2020 DoD
ERIC Educational Resources Information Center
Minnesota State Dept. of Education, St. Paul. Div. of Vocational and Technical Education.
THIS MODULE OF A 25-MODULE COURSE IS DESIGNED AS A REVIEW OF THE OPERATING PRINCIPLES AND SERVICING PROCEDURES FOR GENERATORS AND AS AN INTRODUCTION TO TRANSISTOR CONTROLLED VOLTAGE REGULATION FOR GENERATORS USED ON DIESEL POWERED EQUIPMENT. TOPICS ARE (1) REVIEW OF GENERATOR PRINCIPLES, AC AND DC, (2) SERVICING AND TESTING ALTERNATORS, AND (3)…
Mission operations concepts for Earth Observing System (EOS)
NASA Technical Reports Server (NTRS)
Kelly, Angelita C.; Taylor, Thomas D.; Hawkins, Frederick J.
1991-01-01
Mission operation concepts are described which are being used to evaluate and influence space and ground system designs and architectures with the goal of achieving successful, efficient, and cost-effective Earth Observing System (EOS) operations. Emphasis is given to the general characteristics and concepts developed for the EOS Space Measurement System, which uses a new series of polar-orbiting observatories. Data rates are given for various instruments. Some of the operations concepts which require a total system view are also examined, including command operations, data processing, data accountability, data archival, prelaunch testing and readiness, launch, performance monitoring and assessment, contingency operations, flight software maintenance, and security.
40 CFR 160.63 - Maintenance and calibration of equipment.
Code of Federal Regulations, 2012 CFR
2012-07-01
.... (b) The written standard operating procedures required under § 160.81(b)(11) shall set forth in... maintenance operations were routine and followed the written standard operating procedures. Written records... operating procedures shall designate the person responsible for the performance of each operation. (c...
40 CFR 160.63 - Maintenance and calibration of equipment.
Code of Federal Regulations, 2013 CFR
2013-07-01
.... (b) The written standard operating procedures required under § 160.81(b)(11) shall set forth in... maintenance operations were routine and followed the written standard operating procedures. Written records... operating procedures shall designate the person responsible for the performance of each operation. (c...
40 CFR 160.63 - Maintenance and calibration of equipment.
Code of Federal Regulations, 2010 CFR
2010-07-01
.... (b) The written standard operating procedures required under § 160.81(b)(11) shall set forth in... maintenance operations were routine and followed the written standard operating procedures. Written records... operating procedures shall designate the person responsible for the performance of each operation. (c...
40 CFR 160.63 - Maintenance and calibration of equipment.
Code of Federal Regulations, 2011 CFR
2011-07-01
.... (b) The written standard operating procedures required under § 160.81(b)(11) shall set forth in... maintenance operations were routine and followed the written standard operating procedures. Written records... operating procedures shall designate the person responsible for the performance of each operation. (c...
40 CFR 160.63 - Maintenance and calibration of equipment.
Code of Federal Regulations, 2014 CFR
2014-07-01
.... (b) The written standard operating procedures required under § 160.81(b)(11) shall set forth in... maintenance operations were routine and followed the written standard operating procedures. Written records... operating procedures shall designate the person responsible for the performance of each operation. (c...
Life Cycle Costs in Education: Operations & Maintenance Considered.
ERIC Educational Resources Information Center
Moussatche, Helena; Languell-Urquhart, Jennifer; Woodson, Carol
2000-01-01
Discusses life cycle cost analysis when deciding on flooring finishes and examines operations and maintenance cost effectiveness relative to hard, resilient, and soft flooring. A chart of evaluated flooring materials' characteristics, appropriate maintenance procedures, and recommended frequency is included. (GR)
Deceptive Logistics at the Operational Level of War,
1987-05-04
maintenance, transport , and other combat service support (CSS) activities with the distinct purpose of contributing to an operational headquarters’ overall...based on the exploitation of supply, maintenance, transport , and other combat service support (CSS) activities with the distinct purpose of contributing...exploitation of supply, maintenance, transport , and other CSS activities with the distinct purpose of contributing to an operational headquarters overall
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 19 2014-07-01 2014-07-01 false Maintenance of records for urban bus... SOURCES Urban Bus Rebuild Requirements § 85.1404 Maintenance of records for urban bus operators; submittal of information; right of entry. (a) The operator of any urban bus for which this subpart is...
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 19 2012-07-01 2012-07-01 false Maintenance of records for urban bus... SOURCES Urban Bus Rebuild Requirements § 85.1404 Maintenance of records for urban bus operators; submittal of information; right of entry. (a) The operator of any urban bus for which this subpart is...
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 19 2013-07-01 2013-07-01 false Maintenance of records for urban bus... SOURCES Urban Bus Rebuild Requirements § 85.1404 Maintenance of records for urban bus operators; submittal of information; right of entry. (a) The operator of any urban bus for which this subpart is...
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 18 2011-07-01 2011-07-01 false Maintenance of records for urban bus... SOURCES Urban Bus Rebuild Requirements § 85.1404 Maintenance of records for urban bus operators; submittal of information; right of entry. (a) The operator of any urban bus for which this subpart is...
43 CFR 426.23 - Recovery of operation and maintenance (O&M) costs.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Recovery of operation and maintenance (O&M... operation and maintenance (O&M) costs. (a) General. All new, amended, and renewed contracts shall provide for payment of O&M costs as specified in this section. (b) Amount of O&M costs a district must pay if...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-18
... amended the Airworthiness Limitation Section (ALS) of the Operation & Maintenance Manual OM-02-02 to... shutdowns of the engine(s). TAE has also amended the ALS of the Operation & Maintenance Manual OM- 02-01 to...-E000702 and has amended the Airworthiness Limitation Section (ALS) of the Operation & Maintenance Manual...
Trends in Spending by the Department of Defense for Operation and Maintenance
2017-01-01
CONGRESS OF THE UNITED STATES CONGRESSIONAL BUDGET OFFICE CBO Trends in Spending by the Department of Defense for Operation and Maintenance JANUARY 2017...Funding? g the Growth in O&M Funding cheme gorization Scheme in Explaining Trends in O&M Funding ed ration and Maintenance Between 1980 and 2015 Maintenance ...by Category of Spending ration and Maintenance Between 2000 and 2012, by Category From 2000 to 2012 in Categories That Are Difficult to Track CBO
40 CFR 792.63 - Maintenance and calibration of equipment.
Code of Federal Regulations, 2012 CFR
2012-07-01
... standardized. (b) The written standard operating procedures required under § 792.81(b)(11) shall set forth in... maintenance operations were routine and followed the written standard operating procedures. Written records... operating procedures shall designate the person responsible for the performance of each operation. (c...
40 CFR 792.63 - Maintenance and calibration of equipment.
Code of Federal Regulations, 2011 CFR
2011-07-01
... standardized. (b) The written standard operating procedures required under § 792.81(b)(11) shall set forth in... maintenance operations were routine and followed the written standard operating procedures. Written records... operating procedures shall designate the person responsible for the performance of each operation. (c...
21 CFR 58.63 - Maintenance and calibration of equipment.
Code of Federal Regulations, 2013 CFR
2013-04-01
... standardized. (b) The written standard operating procedures required under § 58.81(b)(11) shall set forth in... maintenance operations were routine and followed the written standard operating procedures. Written records... operating procedures shall designate the person responsible for the performance of each operation. (c...
40 CFR 792.63 - Maintenance and calibration of equipment.
Code of Federal Regulations, 2010 CFR
2010-07-01
... standardized. (b) The written standard operating procedures required under § 792.81(b)(11) shall set forth in... maintenance operations were routine and followed the written standard operating procedures. Written records... operating procedures shall designate the person responsible for the performance of each operation. (c...
21 CFR 58.63 - Maintenance and calibration of equipment.
Code of Federal Regulations, 2011 CFR
2011-04-01
... standardized. (b) The written standard operating procedures required under § 58.81(b)(11) shall set forth in... maintenance operations were routine and followed the written standard operating procedures. Written records... operating procedures shall designate the person responsible for the performance of each operation. (c...
21 CFR 58.63 - Maintenance and calibration of equipment.
Code of Federal Regulations, 2012 CFR
2012-04-01
... standardized. (b) The written standard operating procedures required under § 58.81(b)(11) shall set forth in... maintenance operations were routine and followed the written standard operating procedures. Written records... operating procedures shall designate the person responsible for the performance of each operation. (c...
21 CFR 58.63 - Maintenance and calibration of equipment.
Code of Federal Regulations, 2014 CFR
2014-04-01
... standardized. (b) The written standard operating procedures required under § 58.81(b)(11) shall set forth in... maintenance operations were routine and followed the written standard operating procedures. Written records... operating procedures shall designate the person responsible for the performance of each operation. (c...
40 CFR 792.63 - Maintenance and calibration of equipment.
Code of Federal Regulations, 2013 CFR
2013-07-01
... standardized. (b) The written standard operating procedures required under § 792.81(b)(11) shall set forth in... maintenance operations were routine and followed the written standard operating procedures. Written records... operating procedures shall designate the person responsible for the performance of each operation. (c...
40 CFR 792.63 - Maintenance and calibration of equipment.
Code of Federal Regulations, 2014 CFR
2014-07-01
... standardized. (b) The written standard operating procedures required under § 792.81(b)(11) shall set forth in... maintenance operations were routine and followed the written standard operating procedures. Written records... operating procedures shall designate the person responsible for the performance of each operation. (c...
21 CFR 58.63 - Maintenance and calibration of equipment.
Code of Federal Regulations, 2010 CFR
2010-04-01
... standardized. (b) The written standard operating procedures required under § 58.81(b)(11) shall set forth in... maintenance operations were routine and followed the written standard operating procedures. Written records... operating procedures shall designate the person responsible for the performance of each operation. (c...
NASA Technical Reports Server (NTRS)
Patterson, Linda P.
2001-01-01
The International Space Station (ISS) has an operational mission and profile that makes it a Logistics and Maintenance (L&M) support challenge different from previous programs. It is permanently manned, assembled on orbit, and multi-national. With this technical and operational challenge, a unique approach is needed to support the hardware and crew. The key is the integration of on-orbit and ground analysis, supply, maintenance, and crew training into a coherent functional process that supports ISS goals and objectives. To integrate all the necessary aspects of hardware and personnel to support on-orbit maintenance, a myriad of products and processes must be created and coordinated, such that the right resources are in the right place at the right time to ensure continued ISS functionality. This paper will familiarize the audience with ISS On-Orbit Maintenance (OOM) concepts and capabilities for different maintenance tasks and discuss some of the logic behind their selection. It will also identify the operational maintenance support responsibility split between the U.S. and the various International Partners (IPs).
14 CFR 171.325 - Maintenance and operations requirements.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Maintenance and operations requirements. 171.325 Section 171.325 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF... service. (7) Detailed and specific maintenance procedures and servicing guides stating the frequency of...
14 CFR 171.325 - Maintenance and operations requirements.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Maintenance and operations requirements. 171.325 Section 171.325 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF... service. (7) Detailed and specific maintenance procedures and servicing guides stating the frequency of...
14 CFR 171.325 - Maintenance and operations requirements.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Maintenance and operations requirements. 171.325 Section 171.325 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF... service. (7) Detailed and specific maintenance procedures and servicing guides stating the frequency of...
14 CFR 171.325 - Maintenance and operations requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Maintenance and operations requirements. 171.325 Section 171.325 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF... service. (7) Detailed and specific maintenance procedures and servicing guides stating the frequency of...
14 CFR 171.325 - Maintenance and operations requirements.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Maintenance and operations requirements. 171.325 Section 171.325 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF... service. (7) Detailed and specific maintenance procedures and servicing guides stating the frequency of...
14 CFR 171.161 - Maintenance and operations requirements.
Code of Federal Regulations, 2014 CFR
2014-01-01
... meet at a minimum the Federal Communications Commission's licensing requirements and show that he has the special knowledge and skills needed to maintain the facility, including proficiency in maintenance... facility. (2) Maintenance and operations by authorized persons only. (3) Federal Communications Commission...
14 CFR 171.161 - Maintenance and operations requirements.
Code of Federal Regulations, 2011 CFR
2011-01-01
... meet at a minimum the Federal Communications Commission's licensing requirements and show that he has the special knowledge and skills needed to maintain the facility, including proficiency in maintenance... facility. (2) Maintenance and operations by authorized persons only. (3) Federal Communications Commission...
14 CFR 171.161 - Maintenance and operations requirements.
Code of Federal Regulations, 2012 CFR
2012-01-01
... meet at a minimum the Federal Communications Commission's licensing requirements and show that he has the special knowledge and skills needed to maintain the facility, including proficiency in maintenance... facility. (2) Maintenance and operations by authorized persons only. (3) Federal Communications Commission...
14 CFR 171.161 - Maintenance and operations requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... meet at a minimum the Federal Communications Commission's licensing requirements and show that he has the special knowledge and skills needed to maintain the facility, including proficiency in maintenance... facility. (2) Maintenance and operations by authorized persons only. (3) Federal Communications Commission...
Operation and Maintenance of Water Pollution Control Facilities: A WPCF White Paper.
ERIC Educational Resources Information Center
Hill, William R.; And Others
1979-01-01
Presented are the recommendations of the Water Pollution Control Federation for operation and maintenance consideration during the planning design, construction, and operation of wastewater treatment facilities. (CS)
An improved waste collection system for space flight
NASA Technical Reports Server (NTRS)
Thornton, William E.; Lofland, William W., Jr.; Whitmore, Henry
1986-01-01
Waste collection systems are a critical part of manned space flight. Systems to date have had a number of deficiencies. A new system, which uses a simple mechanical piston compactor and disposable pads allows a clean area for defecation and maximum efficiency of waste collection and storage. The concept has been extensively tested. Flight demonstration units are being built, tested, and scheduled for flight. A prototype operational unit is under construction. This system offers several advantages over existing or planned systems in the areas of crew interface and operation, cost, size, weight, and maintenance and power consumption.
1982-02-01
should also convey an understanding of the differ- ences in learning behavior between initial learning activity and later skill maintenance and...refinement might then be, ATTACK MANEUVERS * Pop-up attack # Loft/ LADO type attack * Level/laydown attack Figure 5-4 showe diagrammatically the...sensitive to differ- ences in performance. Severai criteria should be used to guide the selection/development of performance measures, i.e., measure validity
NASA Astrophysics Data System (ADS)
Harris, V. G.; Koon, N. C.
1997-08-01
A miniature single element effusion cell has been fabricated and tested that allows for the high-vacuum deposition of a variety of transition-metal and rare-earth elements. The cell is designed to operate under high-vacuum conditions, ≈10-9 Torr, with low power demands, <200 W. The virtues of this evaporator are the simplicity of design and ease of fabrication, assembly, maintenance, and operation.
Applied Operations Research: Operator's Assistant
NASA Technical Reports Server (NTRS)
Cole, Stuart K.
2015-01-01
NASA operates high value critical equipment (HVCE) that requires trouble shooting, periodic maintenance and continued monitoring by Operations staff. The complexity HVCE and information required to maintain and trouble shoot HVCE to assure continued mission success as paper is voluminous. Training on new HVCE is commensurate with the need for equipment maintenance. LaRC Research Directorate has undertaken a proactive research to support Operations staff by initiation of the development and prototyping an electronic computer based portable maintenance aid (Operator's Assistant). This research established a goal with multiple objectives and a working prototype was developed. The research identified affordable solutions; constraints; demonstrated use of commercial off the shelf software; use of the US Coast Guard maintenance solution; NASA Procedure Representation Language; and the identification of computer system strategies; where these demonstrations and capabilities support the Operator, and maintenance. The results revealed validation against measures of effectiveness and overall proved a substantial training and capability sustainment tool. The research indicated that the OA could be deployed operationally at the LaRC Compressor Station with an expectation of satisfactorily results and to obtain additional lessons learned prior to deployment at other LaRC Research Directorate Facilities. The research revealed projected cost and time savings.
Proceedings, Conference on the Computing Environment for Mathematical Software
NASA Technical Reports Server (NTRS)
1981-01-01
Recent advances in software and hardware technology which make it economical to create computing environments appropriate for specialized applications are addressed. Topics included software tools, FORTRAN standards activity, and features of languages, operating systems, and hardware that are important for the development, testing, and maintenance of mathematical software.
Helical grip for the cable cars of San Francisco
NASA Technical Reports Server (NTRS)
Peyran, R. J.
1979-01-01
A helical cable car grip to minimize high maintenance costs of San Francisco's cable car operation is presented. The grip establishes a rolling contact between the cable and grip to reduce sliding friction and associated cable wear. The design, development, and testing of the helical cable car grip are described.
ERIC Educational Resources Information Center
Hussain, K. M., Ed.
Contents include an introduction to information systems (basic concepts and life-cycle); development of an information system (design, implementation, testing, and conversion); operation (evaluation and maintenance, quality control, and economics); and case studies of such systems at the New University of Lisbon, Bath University, Laval University…
Solar Heating and Cooling for a Controls Manufacturing Plant Lumberton, New Jersey
NASA Technical Reports Server (NTRS)
1982-01-01
Comprehensive report documents computer-controlled system which has separate solar-collector and cooling-tower areas located away from building and is completely computer controlled. System description, test data, major problems and resolution, performance, operation and maintenance, manufacturer's literature and drawing comprise part of 257-page report.
ERIC Educational Resources Information Center
Air Force Occupational Measurement Center, Lackland AFB, TX.
The Avionics Instrument Systems career ladder (AFSC 325X1) provides flight line and shop maintenance training on aircraft instrument systems, electromechancial instruments, components, and test equipment. Duties involve inspecting, removing, installing, repairing, operating, troubleshooting, overhauling, and modifying systems such as flight and…
49 CFR 193.2613 - Auxiliary power sources.
Code of Federal Regulations, 2011 CFR
2011-10-01
... test must take into account the power needed to start up and simultaneously operate equipment that... 49 Transportation 3 2011-10-01 2011-10-01 false Auxiliary power sources. 193.2613 Section 193.2613...: FEDERAL SAFETY STANDARDS Maintenance § 193.2613 Auxiliary power sources. Each auxiliary power source must...
Solar heating system installed at Telex Communications, Inc., Blue Earth, Minnesota
NASA Technical Reports Server (NTRS)
1977-01-01
The solar heating system for space heating a 97,000 square foot building which houses administrative offices, assembly areas, and warehouse space is summarized. Information on system description, test data, major problems and resolutions, performance, operation and maintenance manual, manufacturer's literature, and as-built drawings is presented.
Operations and Maintenance May Newsletter | Poster
Occurring without notice, unscheduled utility outages (mainly electrical) are abrupt and create a nuisance. During an unscheduled electrical power outage, the Operations and Maintenance (O&M) department will monitor stand-by generators for proper operation.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 25 Indians 1 2011-04-01 2011-04-01 false Establishment of an interim fiscal year 1980 operation and maintenance fund for contract schools. 39.1201 Section 39.1201 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR EDUCATION THE INDIAN SCHOOL EQUALIZATION PROGRAM Contract School Operation and Maintenance Fund § 39.1201 Establishment of...
Code of Federal Regulations, 2013 CFR
2013-04-01
... 25 Indians 1 2013-04-01 2013-04-01 false Establishment of an interim fiscal year 1980 operation and maintenance fund for contract schools. 39.1201 Section 39.1201 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR EDUCATION THE INDIAN SCHOOL EQUALIZATION PROGRAM Contract School Operation and Maintenance Fund § 39.1201 Establishment of...
Code of Federal Regulations, 2012 CFR
2012-04-01
... 25 Indians 1 2012-04-01 2011-04-01 true Establishment of an interim fiscal year 1980 operation and maintenance fund for contract schools. 39.1201 Section 39.1201 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR EDUCATION THE INDIAN SCHOOL EQUALIZATION PROGRAM Contract School Operation and Maintenance Fund § 39.1201 Establishment of a...
Code of Federal Regulations, 2014 CFR
2014-04-01
... 25 Indians 1 2014-04-01 2014-04-01 false Establishment of an interim fiscal year 1980 operation and maintenance fund for contract schools. 39.1201 Section 39.1201 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR EDUCATION THE INDIAN SCHOOL EQUALIZATION PROGRAM Contract School Operation and Maintenance Fund § 39.1201 Establishment of...
Code of Federal Regulations, 2012 CFR
2012-04-01
... 25 Indians 1 2012-04-01 2011-04-01 true How does BIA calculate my annual operation and maintenance assessment if supplemental water is available on the irrigation facility servicing my farm unit? 171.510 Section 171.510 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER IRRIGATION OPERATION AND MAINTENANCE Financial...
Code of Federal Regulations, 2010 CFR
2010-04-01
... 25 Indians 1 2010-04-01 2010-04-01 false How does BIA calculate my annual operation and maintenance assessment if supplemental water is available on the irrigation facility servicing my farm unit? 171.510 Section 171.510 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER IRRIGATION OPERATION AND MAINTENANCE Financial...
Code of Federal Regulations, 2011 CFR
2011-04-01
... 25 Indians 1 2011-04-01 2011-04-01 false How does BIA calculate my annual operation and maintenance assessment if supplemental water is available on the irrigation facility servicing my farm unit? 171.510 Section 171.510 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER IRRIGATION OPERATION AND MAINTENANCE Financial...
Deep Space Station (DSS-13) automation demonstration
NASA Technical Reports Server (NTRS)
Remer, D. S.; Lorden, G.
1980-01-01
The data base collected during a six month demonstration of an automated Deep Space Station (DSS 13) run unattended and remotely controlled is summarized. During this period, DSS 13 received spacecraft telemetry data from Voyager, Pioneers 10 and 11, and Helios projects. Corrective and preventive maintenance are reported by subsystem including the traditional subsystems and those subsystems added for the automation demonstration. Operations and maintenance data for a comparable manned Deep Space Station (DSS 11) are also presented for comparison. The data suggests that unattended operations may reduce maintenance manhours in addition to reducing operator manhours. Corrective maintenance for the unmanned station was about one third of the manned station, and preventive maintenance was about one half.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-16
... transmission lines, 5 new substations, modifications to 4 existing substations, maintenance access roads... address the construction, operation, and maintenance of Basin Electric's proposed Project. The Project includes construction, operation and maintenance of approximately 275 [[Page 50027
14 CFR 171.153 - Requests for IFR procedure.
Code of Federal Regulations, 2010 CFR
2010-01-01
... and maintenance manual that meets the requirement of § 171.161. (4) A statement of intention to meet... operational reliability and an acceptable standard of performance. Previous equivalent operational experience... maintenance manual or maintenance organization. The owner must then correct the deficiencies, if any, and...
Reaffirming Some Basic Principles in Purchasing and Maintenance.
ERIC Educational Resources Information Center
Throop, Harold L., Jr.
1985-01-01
Reaffirms necessary elements for the successful operation of college purchasing and maintenance programs (e.g., purchasing calendar, bidding procedures, vendor selection, contracting services, budgeting for maintenance, and workforce analysis). Discusses ways some colleges are saving on operating costs (e.g., solar energy, energy management,…
7 CFR 1730.24 - RUS review and evaluation.
Code of Federal Regulations, 2014 CFR
2014-01-01
... independent summary of the operations and maintenance practices of the borrower. The borrower's management... and maintenance practices of each borrower for the purpose of assessing loan security and determining..., and records related to the operations and maintenance of its complete system. Reports made by other...
Airborne Oceanographic Lidar (AOL) (Global Carbon Cycle)
NASA Technical Reports Server (NTRS)
2003-01-01
This bimonthly contractor progress report covers the operation, maintenance and data management of the Airborne Oceanographic Lidar and the Airborne Topographic Mapper. Monthly activities included: mission planning, sensor operation and calibration, data processing, data analysis, network development and maintenance and instrument maintenance engineering and fabrication.
Dhaher, Ronnie; Toalston, Jamie E; Hauser, Sheketha R; Bell, Richard L; McKinzie, David L; McBride, William J; Rodd, Zachary A
2012-02-01
Research indicates opioid antagonists can reduce alcohol drinking in rodents. However, tests examining the effects of opioid antagonists on ethanol seeking and relapse behavior have been limited. The present study examined the effects of two opioid antagonists on ethanol maintenance, seeking, and relapse responding by alcohol-preferring (P) rats. Adult P rats were self-trained in two-lever operant chambers to self-administer 15% (vol/vol) ethanol on a fixed-ratio 5 (FR5) versus water on a FR1 concurrent schedule of reinforcement in daily 1-h sessions. After 10 weeks, rats underwent extinction training, followed by 2 weeks in their home cages. Rats were then returned to the operant chambers without ethanol or water to measure responses on the ethanol and water levers for four sessions. After a subsequent 2 weeks in the home cage, without access to ethanol, rats were returned to the operant chambers with ethanol and water available. Effects of antagonists on maintenance responding were tested after several weeks of daily 1-h sessions. Naltrexone (NAL; 1-10mg/kg, subcutaneously [s.c.]; n=8/dose), LY255582 (LY; 0.03-1mg/kg, s.c.; n=8/dose), or vehicle were injected 30min before the first session (in the absence of ethanol), following 2 weeks in their home cages, and for four consecutive sessions of ethanol self-administration under maintenance and relapse conditions. Both NAL and LY reduced responses on the ethanol lever without any fluids present, and ethanol self-administration under relapse and on-going drinking conditions, with LY being more potent than NAL. Both NAL and LY were less effective in reducing responding in the absence of ethanol than in reducing ethanol self-administration. Overall, the results indicate that the opioid system is involved in mediating ethanol seeking, and ethanol self-administration under relapse and on-going alcohol drinking, but that different neurocircuits may underlie these behaviors. Published by Elsevier Inc.
Required technologies for a lunar optical UV-IR synthesis array
NASA Technical Reports Server (NTRS)
Johnson, Stewart W.; Wetzel, John P.
1992-01-01
A Lunar Optical UV-IR Synthesis Array (LOUISA) proposed to take advantage of the characteristics of the lunar environment requires appropriate advances in technology. These technologies are in the areas of contamination/interference control, test and evaluation, manufacturing, construction, autonomous operations and maintenance, power and heating/cooling, stable precision structures, optics, parabolic antennas, and communications/control. LOUISA needs to be engineered to operate for long periods with minimal intervention by humans or robots. What is essential for LOUISA operation is enforcement of a systems engineering approach that makes compatible all lunar operations associated with habitation, resource development, and science.
DOE-EM-45 PACKAGING OPERATIONS AND MAINTENANCE COURSE
DOE Office of Scientific and Technical Information (OSTI.GOV)
Watkins, R.; England, J.
2010-05-28
Savannah River National Laboratory - Savannah River Packaging Technology (SRNL-SRPT) delivered the inaugural offering of the Packaging Operations and Maintenance Course for DOE-EM-45's Packaging Certification Program (PCP) at the University of South Carolina Aiken on September 1 and 2, 2009. Twenty-nine students registered, attended, and completed this training. The DOE-EM-45 Packaging Certification Program (PCP) sponsored the presentation of a new training course, Packaging Maintenance and Operations, on September 1-2, 2009 at the University of South Carolina Aiken (USC-Aiken) campus in Aiken, SC. The premier offering of the course was developed and presented by the Savannah River National Laboratory, and attendedmore » by twenty-nine students across the DOE, NNSA and private industry. This training informed package users of the requirements associated with handling shipping containers at a facility (user) level and provided a basic overview of the requirements typically outlined in Safety Analysis Report for Packaging (SARP) Chapters 1, 7, and 8. The course taught packaging personnel about the regulatory nature of SARPs to help reduce associated and often costly packaging errors. Some of the topics covered were package contents, loading, unloading, storage, torque requirements, maintaining records, how to handle abnormal conditions, lessons learned, leakage testing (including demonstration), and replacement parts. The target audience for this course was facility operations personnel, facility maintenance personnel, and field quality assurance personnel who are directly involved in the handling of shipping containers. The training also aimed at writers of SARP Chapters 1, 7, and 8, package designers, and anyone else involved in radioactive material packaging and transportation safety. Student feedback and critiques of the training were very positive. SRNL will offer the course again at USC Aiken in September 2010.« less
Identifying Potential Weapon Systems That Can Be Divested
2016-04-08
List of Figures Figure 1.1 – TACOM LCMC Sustainment Systems Technical Support (SSTS) Operation Maintenance Army (OMA)……………………………………………………………………….6...LCMC Sustainment Systems Technical Support (SSTS) Operation Maintenance Army (OMA) Requirements Tracking System (TORTS) process used to develop...Force operational concepts (Peltz, 2003). The Army’s ability to keep systems operational from a maintenance standpoint is driven by two factors
2014-09-25
CAPE CANAVERAL, Fla. – Coupled Florida East Coast Railway, or FEC, locomotives No. 433 and No. 428 pass the Vehicle Assembly Building in Launch Complex 39 at NASA’s Kennedy Space Center in Florida on their way to NASA's Locomotive Maintenance Facility. Kennedy's Center Planning and Development Directorate has enlisted the locomotives to support a Rail Vibration Test for the Canaveral Port Authority. The purpose of the test is to collect amplitude, frequency and vibration test data utilizing two Florida East Coast locomotives operating on KSC tracks to ensure that future railroad operations will not affect launch vehicle processing at the center. Buildings instrumented for the test include the Rotation Processing Surge Facility, Thermal Protection Systems Facility, Vehicle Assembly Building, Orbiter Processing Facility and Booster Fabrication Facility. Photo credit: NASA/Daniel Casper
1988-06-01
and PCBs. The pilot program involved screening, testing , and repairing of EMs/PCBs for both COMNAVSEASYSCOM and Commander, Naval Electronic Systems...were chosen from the Support and Test Equipment Engineering Program (STEEP) tests rformed by"IMA San Diego duringl987. A statistical analysis and a Level...were chosen from the Support and Test Equipment Engineering Program (STEEP) tests performed by SIMA San Diego during 1987. A statistical analysis and a
Challenges in sensor development for the electric utility industry
NASA Astrophysics Data System (ADS)
Ward, Barry H.
1999-01-01
The electric utility industry is reducing operating costs in order to prepare for deregulation. The reduction in operating cost has meant a reduction in manpower. The ability to utilize remaining maintenance staff more effectively and to stay competitive in a deregulated environment has therefore become critical. In recent years, the industry has moved away from routine or periodic maintenance to predictive or condition based maintenance. This requires the assessment of equipment condition by frequent testing and inspection; a requirement that is incompatible with cost reduction. To overcome this dilemma, industry trends are toward condition monitoring, whereby the health of apparatus is monitored continuously. This requires the installation of sensors hr transducers on power equipment and the data taken forwarded to an intelligent device for further processing. These devices then analyze the data and make evaluations based on parameter levels or trends, in an attempt to predict possible deterioration. This continuous monitoring allows the electric utility to schedule maintenance on an as needed basis. The industry has been faced with many challenges in sensor design. The measurement of physical, chemical and electrical parameters under extreme conditions of electric fields, magnetic fields, temperature, corrosion, etc. is extensive. This paper will give an overview of these challenges and the solutions adopted for apparatus such as power transformers, circuit breakers, boilers, cables, batteries, and rotating machinery.
Research and development plan for the Slagging Pyrolysis Incinerator. [For TRU waste
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hedahl, T.G.; McCormack, M.D.
1979-01-01
Objective is to develop an incinerator for processing disposed transuranium waste. This R and D plan describes the R and D efforts required to begin conceptual design of the Slagging Pyrolysis Incinerator (Andco-Torrax). The program includes: incinerator, off-gas treatment, waste handling, instrumentation, immobilization analyses, migration studies, regulations, Belgium R and D test plan, Disney World test plan, and remote operation and maintenance. (DLC)
ERIC Educational Resources Information Center
Jacobs, Clinton O.
The report is an evaluation of the effectiveness of the 12 instructional units developed around the use of the Briggs-Stratton Model 80302, 3HP, 8 cu. in. displacement engine having a fuel induction system similar in construction to farm tractor types. The evaluation procedure used was the "one-group Pre-test and Post-test" research method. The…
NASA Technical Reports Server (NTRS)
2001-01-01
Qualtech Systems, Inc. developed a complete software system with capabilities of multisignal modeling, diagnostic analysis, run-time diagnostic operations, and intelligent interactive reasoners. Commercially available as the TEAMS (Testability Engineering and Maintenance System) tool set, the software can be used to reveal unanticipated system failures. The TEAMS software package is broken down into four companion tools: TEAMS-RT, TEAMATE, TEAMS-KB, and TEAMS-RDS. TEAMS-RT identifies good, bad, and suspect components in the system in real-time. It reports system health results from onboard tests, and detects and isolates failures within the system, allowing for rapid fault isolation. TEAMATE takes over from where TEAMS-RT left off by intelligently guiding the maintenance technician through the troubleshooting procedure, repair actions, and operational checkout. TEAMS-KB serves as a model management and collection tool. TEAMS-RDS (TEAMS-Remote Diagnostic Server) has the ability to continuously assess a system and isolate any failure in that system or its components, in real time. RDS incorporates TEAMS-RT, TEAMATE, and TEAMS-KB in a large-scale server architecture capable of providing advanced diagnostic and maintenance functions over a network, such as the Internet, with a web browser user interface.
Eddy Current Flow Measurements in the FFTF
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nielsen, Deborah L.; Polzin, David L.; Omberg, Ronald P.
2017-02-02
The Fast Flux Test Facility (FFTF) is the most recent liquid metal reactor (LMR) to be designed, constructed, and operated by the U.S. Department of Energy (DOE). The 400-MWt sodium-cooled, fast-neutron flux reactor plant was designed for irradiation testing of nuclear reactor fuels and materials for liquid metal fast breeder reactors. Following shut down of the Clinch River Breeder Reactor Plant (CRBRP) project in 1983, FFTF continued to play a key role in providing a test bed for demonstrating performance of advanced fuel designs and demonstrating operation, maintenance, and safety of advanced liquid metal reactors. The FFTF Program provides valuablemore » information for potential follow-on reactor projects in the areas of plant system and component design, component fabrication, fuel design and performance, prototype testing, site construction, and reactor control and operations. This report provides HEDL-TC-1344, “ECFM Flow Measurements in the FFTF Using Phase-Sensitive Detectors”, March 1979.« less
Gligorijevic, Jovan; Gajic, Dragoljub; Brkovic, Aleksandar; Savic-Gajic, Ivana; Georgieva, Olga; Di Gennaro, Stefano
2016-03-01
The packaging materials industry has already recognized the importance of Total Productive Maintenance as a system of proactive techniques for improving equipment reliability. Bearing faults, which often occur gradually, represent one of the foremost causes of failures in the industry. Therefore, detection of their faults in an early stage is quite important to assure reliable and efficient operation. We present a new automated technique for early fault detection and diagnosis in rolling-element bearings based on vibration signal analysis. Following the wavelet decomposition of vibration signals into a few sub-bands of interest, the standard deviation of obtained wavelet coefficients is extracted as a representative feature. Then, the feature space dimension is optimally reduced to two using scatter matrices. In the reduced two-dimensional feature space the fault detection and diagnosis is carried out by quadratic classifiers. Accuracy of the technique has been tested on four classes of the recorded vibrations signals, i.e., normal, with the fault of inner race, outer race, and ball operation. The overall accuracy of 98.9% has been achieved. The new technique can be used to support maintenance decision-making processes and, thus, to increase reliability and efficiency in the industry by preventing unexpected faulty operation of bearings.
Gligorijevic, Jovan; Gajic, Dragoljub; Brkovic, Aleksandar; Savic-Gajic, Ivana; Georgieva, Olga; Di Gennaro, Stefano
2016-01-01
The packaging materials industry has already recognized the importance of Total Productive Maintenance as a system of proactive techniques for improving equipment reliability. Bearing faults, which often occur gradually, represent one of the foremost causes of failures in the industry. Therefore, detection of their faults in an early stage is quite important to assure reliable and efficient operation. We present a new automated technique for early fault detection and diagnosis in rolling-element bearings based on vibration signal analysis. Following the wavelet decomposition of vibration signals into a few sub-bands of interest, the standard deviation of obtained wavelet coefficients is extracted as a representative feature. Then, the feature space dimension is optimally reduced to two using scatter matrices. In the reduced two-dimensional feature space the fault detection and diagnosis is carried out by quadratic classifiers. Accuracy of the technique has been tested on four classes of the recorded vibrations signals, i.e., normal, with the fault of inner race, outer race, and ball operation. The overall accuracy of 98.9% has been achieved. The new technique can be used to support maintenance decision-making processes and, thus, to increase reliability and efficiency in the industry by preventing unexpected faulty operation of bearings. PMID:26938541
NASA Technical Reports Server (NTRS)
1999-01-01
Sentel Corporation has commercialized NASA's Electronic Portable Information Collection (EPIC) System, which stemmed from a NASA Kennedy Space Center SBIR contract. NASA and Sentel designed, built, and tested work authorization procedures used as a paperless procedures system for Space Shuttle and International Space Station payload processing operations. EPIC is now being applied to various markets including; airplane maintenance, aerospace system data management, shipbuilding industries, shipping industries, law enforcement agencies, and public utilities. KSC is planning a pilot program to use EPIC at the Hypergol Maintenance Facility. In addition, Ames Research Center and KSC are working together to apply EPIC to the area of wireless communication.
14 CFR 147.38 - Maintenance of curriculum requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... (CONTINUED) SCHOOLS AND OTHER CERTIFICATED AGENCIES AVIATION MAINTENANCE TECHNICIAN SCHOOLS Operating Rules § 147.38 Maintenance of curriculum requirements. (a) Each certificated aviation maintenance technician...
Modeling the impact of thermal effects on luminous flux maintenance for SSL luminaires
DOE Office of Scientific and Technical Information (OSTI.GOV)
Davis, Lynn; Mills, Karmann; Lamvik, Michael
Meeting the longevity requirements of solid-state lighting (SSL) devices places extreme demands on the materials and designs that are used in SSL luminaires. Therefore, understanding the aging characteristics of lens, reflectors, and other materials is essential to projecting the long-term performance of LED-based lighting systems. Overlooking these factors at either the design or product specification stage can result in premature failure of the device due to poor luminous flux maintenance and/or excessive chromaticity shifts. This paper describes a methodology for performing accelerated stress testing (AST) on materials intended for use in SSL luminaires. This test methodology, which consists of elevatedmore » temperature and humidity conditions, produces accelerated aging data that can be correlated to expected performance under normal luminaire operating conditions. The correlations can then be leveraged to produce models of the changes in the optical properties of key materials including transmittance versus wavelength of lenses and reflectance versus wavelength for housings and other reflectors. This information has been collected into a lumen maintenance decision support tool (LM-DST) and together with user supplied inputs (e.g., expected operation conditions) can provide guidance on lifetime expectations of SSL luminaires. This approach has been applied to a variety of materials commonly found in SSL luminaires including acrylics, polycarbonates, and silicones used for lenses and paints, coatings, films, and composites used for reflectors.« less
Adopt-A-Highway, Statewide M & O, Transportation & Public Facilities, State
& Operations Search DOT&PF State of Alaska DOT&PF > Maintenance & Operations > Maintenance Subcommittee off site link FHWA Operations off site link U.S. DOT off site link Site Map Policies
Best Practices in Photovoltaic System Operations and Maintenance: 2nd Edition
DOE Office of Scientific and Technical Information (OSTI.GOV)
Whaley, Cass
This best practices guide encourages high-quality system deployment and operation that improves lifetime project performance and energy production while reducing, or at least optimizing, costs to deliver an operation and maintenance program.
Operations and Maintenance, Part of Indoor Air Quailty Design Tools for Schools
Effective operation and maintenance procedures are fundamentally important to protect the investment in, and performance of, all building systems. Student health and productivity can suffer when building systems fail to operate as designed.
76 FR 19716 - Airworthiness Directives; BAE SYSTEMS (Operations) Limited Model 4101 Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-08
... Jetstream J41 Aircraft Maintenance Manual (AMM), includes the following chapters: --05-10-10 ``Airworthiness... Jetstream Series 4100 Aircraft Maintenance Manual, Revision 33, dated February 15, 2010. The actions...: * * * BAE Systems (Operations) Ltd has issued Revision 33 of the AMM [airplane maintenance manual] to amend...
Code of Federal Regulations, 2014 CFR
2014-07-01
... surface mine, including any delivery, office, or scientific worker or occasional, short-term maintenance... construction, or who is regularly exposed to mine hazards, or who is a maintenance or service worker employed by the operator or a maintenance or service worker contracted by the operator to work at the mine for...
Code of Federal Regulations, 2012 CFR
2012-07-01
... surface mine, including any delivery, office, or scientific worker or occasional, short-term maintenance... construction, or who is regularly exposed to mine hazards, or who is a maintenance or service worker employed by the operator or a maintenance or service worker contracted by the operator to work at the mine for...
Code of Federal Regulations, 2013 CFR
2013-07-01
... surface mine, including any delivery, office, or scientific worker or occasional, short-term maintenance... construction, or who is regularly exposed to mine hazards, or who is a maintenance or service worker employed by the operator or a maintenance or service worker contracted by the operator to work at the mine for...
Code of Federal Regulations, 2011 CFR
2011-07-01
... surface mine, including any delivery, office, or scientific worker or occasional, short-term maintenance... construction, or who is regularly exposed to mine hazards, or who is a maintenance or service worker employed by the operator or a maintenance or service worker contracted by the operator to work at the mine for...
Code of Federal Regulations, 2010 CFR
2010-01-01
..., and maintenance of the renewable energy system or energy efficiency improvement will operate or..., installation, and maintenance. Authoritative evidence that project team service providers have the necessary... and shakedown, warranties, insurance, financing, professional services, and operations and maintenance...
Code of Federal Regulations, 2011 CFR
2011-01-01
..., and maintenance of the renewable energy system or energy efficiency improvement will operate or..., installation, and maintenance. Authoritative evidence that project team service providers have the necessary... and shakedown, warranties, insurance, financing, professional services, and operations and maintenance...
40 CFR 60.11 - Compliance with standards and maintenance requirements.
Code of Federal Regulations, 2014 CFR
2014-07-01
... operating and maintenance procedures are being used will be based on information available to the... operating and maintenance procedures, and inspection of the source. (e)(1) For the purpose of demonstrating... Administrator, in writing, to the contrary. For the purpose of determining compliance with the opacity standard...
40 CFR 60.11 - Compliance with standards and maintenance requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
... operating and maintenance procedures are being used will be based on information available to the... operating and maintenance procedures, and inspection of the source. (e)(1) For the purpose of demonstrating... Administrator, in writing, to the contrary. For the purpose of determining compliance with the opacity standard...
49 CFR 214.503 - Good-faith challenges; procedures for notification and resolution.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Roadway Maintenance Machines and Hi-Rail Vehicles § 214.503 Good-faith challenges; procedures for notification and resolution. (a) An employee operating an on-track roadway maintenance machine or hi-rail.... (b) Any employee charged with operating an on-track roadway maintenance machine or hi-rail vehicle...
Fluid Power Systems Maintenance and Operation. Instructor's Guide.
ERIC Educational Resources Information Center
Paule, Bob A.
Written to complement the Fluid Power/Basic Hydraulic and Basic Pneumatics guides, this curriculum guide contains materials for a seven-unit course in fluid power systems maintenance and operation. Units, which consist of one to eight lessons, cover these topics: preventive maintenance, repair machine malfunctions, overhaul/recondition hydraulic…
Jayasumana, Channa; Ranasinghe, Omesh; Ranasinghe, Sachini; Siriwardhana, Imalka; Gunatilake, Sarath; Siribaddana, Sisira
2016-11-01
Chronic Interstitial Nephritis in Agricultural Communities (CINAC) causes major morbidity and mortality for farmers in North-Central province (NCP) of Sri Lanka. To prevent the CINAC, reverse osmosis (RO) plants are established to purify the water and reduce the exposure to possible nephrotoxins through drinking water. We assessed RO plant maintenance and efficacy in NCP. We have interviewed 10 RO plant operators on plant establishment, maintenance, usage and funding. We also measured total dissolved solids (TDS in ppm) to assess the efficacy of the RO process. Most RO plants were operated by community-based organizations. They provide clean and sustainable water source for many in the NCP for a nominal fee, which tends to be variable. The RO plant operators carry out RO plant maintenance. However, maintenance procedures and quality management practices tend to vary from an operator to another. RO process itself has the ability to lower the TDS of the water. On average, RO process reduces the TDS to 29 ppm. The RO process reduces the impurities in water available to many individuals within CINAC endemic regions. However, there variation in maintenance, quality management, and day-to-day care between operators can be a cause for concern. This variability can affect the quality of water produced by RO plant, its maintenance cost and lifespan. Thus, uniform regulation and training is needed to reduce cost of maintenance and increase the efficacy of RO plants.
Infrared thermographic diagnostic aid to aircraft maintenance
NASA Astrophysics Data System (ADS)
Delo, Michael; Delo, Steve
2007-04-01
Thermographic data can be used as a supplement to aircraft maintenance operations in both back shop and flight line situations. Aircraft systems such as electrical, propulsion, environmental, pitot static and hydraulic/pneumatic fluid, can be inspected using a thermal infrared (IR) imager. Aircraft systems utilize electro-hydraulic, electro-mechanical, and electro-pneumatic mechanisms, which, if accessible, can be diagnosed for faults using infrared technology. Since thermographs are images of heat, rather than light, the measurement principle is based on the fact that any physical object (radiating energy at infrared wavelengths within the IR portion of the electro-magnetic spectrum), can be imaged with infrared imaging equipment. All aircraft systems being tested with infrared are required to be energized for troubleshooting, so that valuable baseline data from fully operational aircraft can be collected, archived and referenced for future comparisons.
Feasibility study for a transportation operations system cask maintenance facility
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rennich, M.J.; Medley, L.G.; Attaway, C.R.
The US Department of Energy (DOE), Office of Civilian Radioactive Waste Management (OCRWM) is responsible for the development of a waste management program for the disposition of spent nuclear fuel (SNF) and high-level waste (HLW). The program will include a transportation system for moving the nuclear waste from the sources to a geologic repository for permanent disposal. Specially designed casks will be used to safely transport the waste. The cask systems must be operated within limits imposed by DOE, the Nuclear Regulatory Commission (NRC), and the Department of Transportation (DOT). A dedicated facility for inspecting, testing, and maintaining the caskmore » systems was recommended by the General Accounting Office (in 1979) as the best means of assuring their operational effectiveness and safety, as well as regulatory compliance. In November of 1987, OCRWM requested a feasibility study be made of a Cask Maintenance Facility (CMF) that would perform the required functions. 46 refs., 16 figs., 13 tabs.« less
Scholz, Miklas
2004-12-01
The purpose of this case study was to optimise design, operation and maintenance guidelines, and to assess the water treatment potential of a storm water pond system after 15 months of operation. The system was based on a combined silt trap, attenuation pond and vegetated infiltration basin. This combination was used as the basis for construction of a roof water runoff system from a single domestic property. United Kingdom Building Research Establishment and Construction Industry Research and Information Association, and German Association for Water, Wastewater and Waste design guidelines were tested. These design guidelines failed because they did not consider local conditions. The infiltration function for the infiltration basin was logarithmic. Algal control techniques were successfully applied, and treatment of rainwater runoff from roofs was found to be largely unnecessary for recycling (e.g., watering plants). However, seasonal and diurnal variations of biochemical oxygen demand, dissolved oxygen and pH were recorded.
1986-07-01
qualified lubricants were employed in the test, one product at each of the test locations. The test lubricants were used in all equipment components...Overall, the grade 15W-40 products demonstrated satisfactory and equivalent performance to single-graded oils. The oil was well received by both...operators and maintenance personnel who noted that the grade 15W-40 products significantly reduced logistics burden by having only one grade product to
Estimating cost per lane mile for routine highway operations and maintenance
DOT National Transportation Integrated Search
2011-01-01
The disparity between maintenance budgets and maintenance requirements causes agencies to make difficult choices : about maintenance priorities. There is a growing need to effectively link maintenance costs and condition to provide clear : evidence o...
NASA Technical Reports Server (NTRS)
Huff, Edward M.; Lewicki, David G.; Tumer, Irem Y.; Decker, Harry; Barszez, Eric; Zakrajsek, James J.; Norvig, Peter (Technical Monitor)
2000-01-01
As part of a collaborative research program between NASA Ames Research Center (ARC), NASA Glenn Research Center (GRC), and the US Army Laboratory, a series of experiments is being performed in GRC's 500 HP OH-58 Transmission Test Rig facility and ARC's AH-I Cobra and OH-58c helicopters. The findings reported in this paper were drawn from Phase-I of a two-phase test-rig experiment, and are focused on the vibration response of an undamaged pinion gear operating in the transmission test rig. To simulate actual flight conditions, the transmission system was run at three torque levels, as well as two mast lifting and two mast bending levels. The test rig was also subjected to disassembly and reassembly of the main pinion housing to simulate the effect of maintenance operations. An analysis of variance based on the total power of the spectral distribution indicates the relative effect of each experimental factor, including Wong interactions with torque. Reinstallation of the main pinion assembly is shown to introduce changes in the vibration signature, suggesting the possibility of a strong effect of maintenance on HUMS design and use. Based on these results, further research will be conducted to compare these vibration responses with actual OH58c helicopter transmission vibration patterns.
Besseling, Rut; Damen, Michiel; Tran, Thanh; Nguyen, Thanh; van den Dries, Kaspar; Oostra, Wim; Gerich, Ad
2015-10-10
Dry powder mixing is a wide spread Unit Operation in the Pharmaceutical industry. With the advent of in-line Near Infrared (NIR) Spectroscopy and Quality by Design principles, application of Process Analytical Technology to monitor Blend Uniformity (BU) is taking a more prominent role. Yet routine use of NIR for monitoring, let alone control of blending processes is not common in the industry, despite the improved process understanding and (cost) efficiency that it may offer. Method maintenance, robustness and translation to regulatory requirements have been important barriers to implement the method. This paper presents a qualitative NIR-BU method offering a convenient and compliant approach to apply BU control for routine operation and process understanding, without extensive calibration and method maintenance requirements. The method employs a moving F-test to detect the steady state of measured spectral variances and the endpoint of mixing. The fundamentals and performance characteristics of the method are first presented, followed by a description of the link to regulatory BU criteria, the method sensitivity and practical considerations. Applications in upscaling, tech transfer and commercial production are described, along with evaluation of the method performance by comparison with results from quantitative calibration models. A full application, in which end-point detection via the F-test controls the blending process of a low dose product, was successfully filed in Europe and Australia, implemented in commercial production and routinely used for about five years and more than 100 batches. Copyright © 2015 Elsevier B.V. All rights reserved.
Attention modulates maintenance of representations in visual short-term memory.
Kuo, Bo-Cheng; Stokes, Mark G; Nobre, Anna Christina
2012-01-01
Recent studies have shown that selective attention is of considerable importance for encoding task-relevant items into visual short-term memory (VSTM) according to our behavioral goals. However, it is not known whether top-down attentional biases can continue to operate during the maintenance period of VSTM. We used ERPs to investigate this question across two experiments. Specifically, we tested whether orienting attention to a given spatial location within a VSTM representation resulted in modulation of the contralateral delay activity (CDA), a lateralized ERP marker of VSTM maintenance generated when participants selectively encode memory items from one hemifield. In both experiments, retrospective cues during the maintenance period could predict a specific item (spatial retrocue) or multiple items (neutral retrocue) that would be probed at the end of the memory delay. Our results revealed that VSTM performance is significantly improved by orienting attention to the location of a task-relevant item. The behavioral benefit was accompanied by modulation of neural activity involved in VSTM maintenance. Spatial retrocues reduced the magnitude of the CDA, consistent with a reduction in memory load. Our results provide direct evidence that top-down control modulates neural activity associated with maintenance in VSTM, biasing competition in favor of the task-relevant information.
Operations and maintenance philosophy
DOE Office of Scientific and Technical Information (OSTI.GOV)
DUNCAN, G.P.
1999-10-28
This Operations and Maintenance (O&M) Philosophy document is intended to establish a future O&M vision, with an increased focus on minimizing worker exposure, ensuring uninterrupted retrieval operations, and minimizing operation life-cycle cost. It is intended that this document would incorporate O&M lessons learned into on-going and future project upgrades.