Shoemark, Helen; Rimmer, Jo; Bower, Janeen; Tucquet, Belinda; Miller, Lauren; Fisher, Michelle; Ogburn, Nicholas; Dun, Beth
2018-03-09
This article reports on a project at the Royal Children's Hospital Melbourne in which the music therapy team synthesized their practice and related theories to propose a new conceptual framework for music therapy in their acute pediatric setting. The impetus for the project was the realization that in the process of producing key statements about the non-musical benefits of music therapy, the cost was often the suppression of information about the patient's unique musical potential as the major (mediating) pathway from referral reason, to music therapy, and to effective outcomes. The purpose of the project was to articulate how this team of clinicians conceive of the patient's musical self as the major theoretical pathway for music therapy in an evidence-based acute medical setting. The clinicians' shared reflexive process across six months involved robust directed discussion, annotation of shared reading, and documentation of all engagement in words and diagrams. The outcome was a consensus framework including three constructs: the place of music in the life of the infant, child, and young people, Culture and Context, and Musical Manifestations. The constructs were tested in a clinical audit, and found to be robustly inclusive. In addition to the conceptual framework, this project serves to demonstrate a process by which clinical teams may reflect on their individual practice and theory together to create a consensus stance for the overall service they provide in the one setting.
Song, Peipei; Inagaki, Yoshinori; Sugawara, Yasuhiko; Kokudo, Norihiro
2013-06-01
A research project involving sheets of retinal pigment epithelium constructed from iPS cells derived from patients with age-related maculopathy is one step closer to being approved for clinical trials by the Japanese Government. Now is the time to make therapies using iPS cells clinically available.
McCartney, Elspeth; Boyle, James; Bannatyne, Susan; Jessiman, Emma; Campbell, Cathy; Kelsey, Cherry; Smith, Jennifer; O'Hare, Anne
2004-01-01
The construction of therapy protocols for a large-scale randomized controlled trial comparing speech and language therapists and assistants, and group and individual therapy approaches for children aged 6-11 in mainstream schools is outlined. The aim was to outline the decision-making processes that led to the construction of the research therapy manual, and to give a preliminary report on compliance with the manual. A search of the research and professional literature and of published therapy materials was conducted to locate usable examples of effective language therapy for primary school children. Results were collated into a manual of therapy principles and activities to structure research intervention. The use of the manual with children (n=30) receiving individual or group direct therapy from a speech and language therapist in the first phase of intervention was audited. Very few high-level research studies were found, but the professional literature gave added information. Therapies for comprehension monitoring, vocabulary development, later grammar and narrative were adapted for the research intervention, and procedures compiled into a manual to guide research speech and language therapists and assistants. The audit of direct therapy suggested that the manual was useable, providing a suitable range of activities and materials for therapy intervention. Its use helped to record the therapy offered to research children, and formed a sound basis for discussion amongst speech and language therapists and between speech and language therapist/assistant pairs. The construction and use of a therapy manual allowed the provision of replicable therapy within the research project whilst maintaining flexibility.
Status of the Proton Therapy Project at IUCF and the Midwest Proton Radiotherapy Institute
NASA Astrophysics Data System (ADS)
Klein, Susan B.
2003-08-01
The first proton therapy patient was successfully treated for astrocytoma using a modified nuclear experimentation beam line and in-house treatment planning in 1993. In 1998, IUCF constructed an eye treatment clinic, and conducted a phase III clinical trial investigating proton radiation treatment of AMD. Treatment was planned using Eyeplan modified to match the IUCF beam characteristics. MPRI was conceptualized in 1996 by a consortium of physicians and physicists. Reconfiguration began in 2000; construction of the achromatic trunk line began in 2001, followed by manufacture of 4 energy selection lines and two fixed horizontal beam treatment lines. Two isocentric, rotational gantries will be installed following completion of the horizontal beam lines. A fifth line will supply the full-time radiation effects research station. Standard proton delivery out of the main stage is specified at 500 nA of 205 MeV. Clinic construction began in April, 2002 and will be completed by mid-December. Design, construction and operation of these proton facilities have been accomplished by the proton therapy group at IUCF.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Karagoz, Muge
1998-01-01
In order to investigate the possibility of the construction of a sample PET coincidence unit in our HEP laboratory, a setup with two face to face PMTs and two 2x8 Csi(Tl) scintillator matrices has been constructed. In this setup, 1-D projections of a pointlike 22 Na positron source at different angles have been measured. Using these projections a 2-D image has been formed. Monte Carlo studies of this setup have been implemented using the detector simulation tool in CERN program library, GEANT. Again with GEANT a sample human body is created to study the effects of proton therapy. Utilization ofmore » the simulation as a pretherapy tool is also investigated.« less
Synthetic biology projects in vitro.
Forster, Anthony C; Church, George M
2007-01-01
Advances in the in vitro synthesis and evolution of DNA, RNA, and polypeptides are accelerating the construction of biopolymers, pathways, and organisms with novel functions. Known functions are being integrated and debugged with the aim of synthesizing life-like systems. The goals are knowledge, tools, smart materials, and therapies.
Occupational Therapy and Sexual and Reproductive Health Promotion in Adolescence: A Case Study.
Gontijo, Daniela Tavares; de Sena e Vasconcelos, Anna Carolina; Monteiro, Rosana Juliet Silva; Facundes, Vera Lúcia Dutra; Trajano, Maria de Fátima Cordeiro; de Lima, Luciane Soares
2016-03-01
Occupational therapy can contribute to sexual and reproductive health through health education. The purpose of this study was to describe an occupational therapy intervention aimed at sexual and reproductive health promotion in adolescents. Fifty-eight adolescents were involved in the study, before, during and after the interventions. Educative activities such as puzzles, storytelling, mime and board games were used, which occupational therapy faculty and students had constructed. The games were employed as mediators for gaining knowledge in sexual and reproductive health. Outcome was measured using a questionnaire, audio recordings and field diaries. The data were analysed by descriptive statistics and thematic content analysis. The results showed the adolescents' increased knowledge of sexual and reproductive health information immediately after the intervention. The thematic analysis was grouped into three categories: the adolescents' initial expectations regarding the project, reflections on the process experienced during the interventions and use of educational games by occupational therapists. The importance of rapport and dialogue was highlighted in the construction of interventions based on participatory methods. The absence of a longitudinal follow-up is a limitation in this study. Further research is important to systematically assess sexual health promotion strategies in adolescence. Copyright © 2015 John Wiley & Sons, Ltd.
Kreiner, A J; Castell, W; Di Paolo, H; Baldo, M; Bergueiro, J; Burlon, A A; Cartelli, D; Vento, V Thatar; Kesque, J M; Erhardt, J; Ilardo, J C; Valda, A A; Debray, M E; Somacal, H R; Sandin, J C Suarez; Igarzabal, M; Huck, H; Estrada, L; Repetto, M; Obligado, M; Padulo, J; Minsky, D M; Herrera, M; Gonzalez, S J; Capoulat, M E
2011-12-01
We describe the present status of an ongoing project to develop a Tandem-ElectroStatic-Quadrupole (TESQ) accelerator facility for Accelerator-Based (AB)-BNCT. The project final goal is a machine capable of delivering 30 mA of 2.4 MeV protons to be used in conjunction with a neutron production target based on the (7)Li(p,n)(7)Be reaction. The machine currently being constructed is a folded TESQ with a high-voltage terminal at 0.6 MV. We report here on the progress achieved in a number of different areas. Copyright © 2011 Elsevier Ltd. All rights reserved.
Design and Development of a Megavoltage CT Scanner for Radiation Therapy.
NASA Astrophysics Data System (ADS)
Chen, Ching-Tai
A Varian 4 MeV isocentric therapy accelerator has been modified to perform also as a CT scanner. The goal is to provide low cost computed tomography capability for use in radiotherapy. The system will have three principal uses. These are (i) to provide 2- and 3-dimensional maps of electron density distribution for CT assisted therapy planning, (ii) to aid in patient set up by providing sectional views of the treatment volume and high contrast scout-mode verification images and (iii) to provide a means for periodically checking the patients anatomical conformation against what was used to generate the original therapy plan. The treatment machine was modified by mounting an array of detectors on a frame bolted to the counter weight end of the gantry in such a manner as to define a 'third generation' CT Scanner geometry. The data gathering is controlled by a Z-80 based microcomputer system which transfers the x-ray transmission data to a general purpose PDP 11/34 for processing. There a series of calibration processes and a logarithmic conversion are performed to get projection data. After reordering the projection data to an equivalent parallel beam sinogram format a convolution algorithm is employed to construct the image from the equivalent parallel projection data. Results of phantom studies have shown a spatial resolution of 2.6 mm and an electron density discrimination of less than 1% which are sufficiently good for accurate therapy planning. Results also show that the system is linear to within the precision of our measurement ((DBLTURN).75%) over a wide range of electron densities corresponding to those found in body tissues. Animal and human images are also presented to demonstrate that the system's imaging capability is sufficient to allow the necessary visualization of anatomy.
Personal Construct Theory and Systemic Therapies: Parallel or Convergent Trends?
ERIC Educational Resources Information Center
Feixas, Guillem
1990-01-01
Explores similarities between Kelly's Personal Construct Theory (PCT) and systemic therapies. Asserts that (1) PCT and systemic therapies share common epistemological stance, constructivism; (2) personal construct systems possess properties of open systems; and (3) PCT and systemic therapies hold similar positions on relevant theoretical and…
Shimizu, Shinichi; Tsuchiya, Kazuhiko; Takao, Seishin; Shirato, Hiroki
2014-05-01
Cancer is the most major cause of death in Japan recently. In this symposium, we explained advanced treatment technology for cancer treatment, now used and that will be used in near future at the Hokkaido University Hospital. Intensity Moderated Radiation Therapy (IMRT) and Proton Beam Therapy (PBT) are considered to be the most promising and advanced technologies for cancer treatment. Various kinds of radiation treatment equipment and methods have been developed and constructed at the Hokkaido University. One of the most worlds wide famous one is the real time tumor tracking radiotherapy system. The FIRST (Funding for World-Leading Innovative R&D on Science and Technology) Program has been supporting us to produce cutting-edge technology. We hope that this symposium would help the audience to understand the latest technology for cancer treatment especially in the field of radiation therapy and also we wish the audience would recognize the importance of the research aspect that have been performed at Hokkaido University and its Hospital.
How Do DSM-5 Personality Traits Align With Schema Therapy Constructs?
Bach, Bo; Lee, Christopher; Mortensen, Erik Lykke; Simonsen, Erik
2016-08-01
DSM-5 offers an alternative model of personality pathology that includes 25 traits. Although personality disorders are mostly treated with psychotherapy, the correspondence between DSM-5 traits and concepts in evidence-based psychotherapy has not yet been evaluated adequately. Suitably, schema therapy was developed for treating personality disorders, and it has achieved promising evidence. The authors examined associations between DSM-5 traits and schema therapy constructs in a mixed sample of 662 adults, including 312 clinical participants. Associations were investigated in terms of factor loadings and regression coefficients in relation to five domains, followed by specific correlations among all constructs. The results indicated conceptually coherent associations, and 15 of 25 traits were strongly related to relevant schema therapy constructs. Conclusively, DSM-5 traits may be considered expressions of schema therapy constructs, which psychotherapists might take advantage of in terms of case formulation and targets of treatment. In turn, schema therapy constructs add theoretical understanding to DSM-5 traits.
Design, construction and tests of a 3 GHz proton linac booster (LIBO) for cancer therapy
NASA Astrophysics Data System (ADS)
Berra, Paolo
2007-12-01
In the last ten years the use of proton beams in radiation therapy has become a clinical tool for treatment of deep-seated tumours. LIBO is a RF compact and low cost proton linear accelerator (SCL type) for hadrontherapy. It is conceived by TERA Foundation as a 3 GHz Linac Booster, to be mounted downstream of an existing cyclotron in order to boost the energy of the proton beam up to 200 MeV, needed for deep treatment (~25 cm) in the human body. With this solution it is possible to transform a low energy commercial cyclotron, normally used for eye melanoma therapy, isotope production and nuclear physics research, into an accelerator for deep-seated tumours. A prototype module of LIBO has been built and successfully tested with full RF power at CERN and with proton beam at INFN Laboratori Nazionali del Sud (LNS) in Catania, within an international collaboration between TERA Foundation, CERN, the Universities and INFN groups of Milan and Naples. The mid-term aim of the project is the technology transfer of the accumulated know-how to a consortium of companies and to bring this novel medical tool to hospitals. The design, construction and tests of the LIBO prototype are described in detail.
Progress on the accelerator based SPES-BNCT project at INFN Legnaro
DOE Office of Scientific and Technical Information (OSTI.GOV)
Esposito, J.; Colautti, P.; Pisent, A.
2007-02-12
In the framework of an advanced Exotic Ion Beam facility, named SPES (Study and Production of Exotic Species), that will allow a frontier program both in nuclear and interdisciplinary physics, an intense thermal neutron beam facility, devoted to perform Boron Neutron Capture Therapy (BNCT) experimental treatments on skin melanoma tumor, is currently under construction based on the SPES proton driver. A vast radiobiological investigation in vitro and in vivo has started with the new 10B carriers developed. Special microdosimetric detectors have been constructed to properly measure all the BNCT dose components and their qualities. Both microdosimetric and radiobiological measurements aremore » being performed at the new HYTHOR beam shaping assembly at the Enea-Casaccia TAPIRO reactor.« less
Cristea, Ioana A; Montgomery, Guy H; Szamoskozi, Stefan; David, Daniel
2013-06-01
We aimed to relate key constructs from three forms of cognitive behavioral therapy that are often placed in competition: rational emotive behavior therapy, cognitive therapy, and acceptance and commitment therapy. The key constructs of the underlying theories (i.e., irrational beliefs/unconditional self-acceptance, dysfunctional cognitions, experiential avoidance/psychological inflexibility) of these therapies have not been explicitly studied in their relationships to each other and with emotional distress. We used a cross-sectional design. The variables were selected to indicate key constructs of the three major forms of therapy considered. Study 1 used a sample of 152 students, who were assessed during a stressful period of their semester (mean age = 21.71; 118 females), while Study 2 used a clinical sample of 28 patients with generalized anxiety disorder (mean age = 26.67; 26 females). Results showed that these constructs, central in the therapies considered, had medium to high associations to each other and to distress. Experiential avoidance was found to mediate the relationship between the other, schema-type cognitive constructs and emotional distress. Moreover, multiple mediation analysis in Study 2 seemed to indicate that the influence of the more general constructs on distress was mediated by experiential avoidance, whose effect seemed to be carried on further by automatic thoughts that were the most proximal to distress. Although each of the cognitive constructs considered comes with its underlying theory, the relationships between them can no longer be ignored and cognitive behavioral therapy theoretical models reliably accounting for these relationships should be proposed and tested. © 2013 Wiley Periodicals, Inc.
A beam monitor based on MPGD detectors for hadron therapy
NASA Astrophysics Data System (ADS)
Altieri, P. R.; Di Benedetto, D.; Galetta, G.; Intonti, R. A.; Mercadante, A.; Nuzzo, S.; Verwilligen, P.
2018-02-01
Remarkable scientific and technological progress during the last years has led to the construction of accelerator based facilities dedicated to hadron therapy. This kind of technology requires precise and continuous control of position, intensity and shape of the ions or protons used to irradiate cancers. Patient safety, accelerator operation and dose delivery should be optimized by a real time monitoring of beam intensity and profile during the treatment, by using non-destructive, high spatial resolution detectors. In the framework of AMIDERHA (AMIDERHA - Enhanced Radiotherapy with HAdron) project funded by the Ministero dell'Istruzione, dell'Università e della Ricerca (Italian Ministry of Education and Research) the authors are studying and developing an innovative beam monitor based on Micro Pattern Gaseous Detectors (MPDGs) characterized by a high spatial resolution and rate capability. The Monte Carlo simulation of the beam monitor prototype was carried out to optimize the geometrical set up and to predict the behavior of the detector. A first prototype has been constructed and successfully tested using 55Fe, 90Sr and also an X-ray tube. Preliminary results on both simulations and tests will be presented.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Farjam, Reza; Tsien, Christina I.; Lawrence, Theodore S.
Purpose: To develop a pharmacokinetic modelfree framework to analyze the dynamic contrast enhanced magnetic resonance imaging (DCE-MRI) data for assessment of response of brain metastases to radiation therapy. Methods: Twenty patients with 45 analyzable brain metastases had MRI scans prior to whole brain radiation therapy (WBRT) and at the end of the 2-week therapy. The volumetric DCE images covering the whole brain were acquired on a 3T scanner with approximately 5 s temporal resolution and a total scan time of about 3 min. DCE curves from all voxels of the 45 brain metastases were normalized and then temporally aligned. Amore » DCE matrix that is constructed from the aligned DCE curves of all voxels of the 45 lesions obtained prior to WBRT is processed by principal component analysis to generate the principal components (PCs). Then, the projection coefficient maps prior to and at the end of WBRT are created for each lesion. Next, a pattern recognition technique, based upon fuzzy-c-means clustering, is used to delineate the tumor subvolumes relating to the value of the significant projection coefficients. The relationship between changes in different tumor subvolumes and treatment response was evaluated to differentiate responsive from stable and progressive tumors. Performance of the PC-defined tumor subvolume was also evaluated by receiver operating characteristic (ROC) analysis in prediction of nonresponsive lesions and compared with physiological-defined tumor subvolumes. Results: The projection coefficient maps of the first three PCs contain almost all response-related information in DCE curves of brain metastases. The first projection coefficient, related to the area under DCE curves, is the major component to determine response while the third one has a complimentary role. In ROC analysis, the area under curve of 0.88 ± 0.05 and 0.86 ± 0.06 were achieved for the PC-defined and physiological-defined tumor subvolume in response assessment. Conclusions: The PC-defined subvolume of a brain metastasis could predict tumor response to therapy similar to the physiological-defined one, while the former is determined more rapidly for clinical decision-making support.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Farjam, Reza; Tsien, Christina I.; Lawrence, Theodore S.
2014-01-15
Purpose: To develop a pharmacokinetic modelfree framework to analyze the dynamic contrast enhanced magnetic resonance imaging (DCE-MRI) data for assessment of response of brain metastases to radiation therapy. Methods: Twenty patients with 45 analyzable brain metastases had MRI scans prior to whole brain radiation therapy (WBRT) and at the end of the 2-week therapy. The volumetric DCE images covering the whole brain were acquired on a 3T scanner with approximately 5 s temporal resolution and a total scan time of about 3 min. DCE curves from all voxels of the 45 brain metastases were normalized and then temporally aligned. Amore » DCE matrix that is constructed from the aligned DCE curves of all voxels of the 45 lesions obtained prior to WBRT is processed by principal component analysis to generate the principal components (PCs). Then, the projection coefficient maps prior to and at the end of WBRT are created for each lesion. Next, a pattern recognition technique, based upon fuzzy-c-means clustering, is used to delineate the tumor subvolumes relating to the value of the significant projection coefficients. The relationship between changes in different tumor subvolumes and treatment response was evaluated to differentiate responsive from stable and progressive tumors. Performance of the PC-defined tumor subvolume was also evaluated by receiver operating characteristic (ROC) analysis in prediction of nonresponsive lesions and compared with physiological-defined tumor subvolumes. Results: The projection coefficient maps of the first three PCs contain almost all response-related information in DCE curves of brain metastases. The first projection coefficient, related to the area under DCE curves, is the major component to determine response while the third one has a complimentary role. In ROC analysis, the area under curve of 0.88 ± 0.05 and 0.86 ± 0.06 were achieved for the PC-defined and physiological-defined tumor subvolume in response assessment. Conclusions: The PC-defined subvolume of a brain metastasis could predict tumor response to therapy similar to the physiological-defined one, while the former is determined more rapidly for clinical decision-making support.« less
Theoretical framework of the causes of construction time and cost overruns
NASA Astrophysics Data System (ADS)
Ullah, K.; Abdullah, A. H.; Nagapan, S.; Suhoo, S.; Khan, M. S.
2017-11-01
Any construction practitioner fundamental goal is to complete the projects within estimated duration and budgets, and expected quality targets. However, time and cost overruns are regular and universal phenomenon in construction projects and the construction projects in Malaysia has no exemption from the problems of time overrun and cost overrun. In order to accomplish the successful completion of construction projects on specified time and within planned cost, there are various factors that should be given serious attention so that issues such as time and cost overrun can be addressed. This paper aims to construct a framework for the causes of time overrun and cost overrun in construction projects of Malaysia. Based on the relevant literature review, causative factors of time overrun and cost overrun in Malaysian construction projects are summarized and the theoretical frameworks of the causes of construction time overrun and cost overrun is constructed. The developed frameworks for construction time and cost overruns based on the existing literature will assist the construction practitioners to plan the efficient approaches for achieving successful completion of the projects.
42 CFR 137.332 - On what basis may the Secretary reject a final construction project proposal?
Code of Federal Regulations, 2010 CFR
2010-10-01
... face clearly demonstrates that the construction project cannot be completed as proposed. (b) For construction programs proposed to be included in a construction project agreement, the Secretary may also... construction project proposal? 137.332 Section 137.332 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF...
A Potent Oncolytic Herpes Simplex Virus for Therapy of Advanced Prostate Cancer
2005-07-01
DNA replication in the targeted cells. As oncolytic HSV can only initiate - viral replication in tumor cells, this restricts the syncytial formation from virus infection to malignant cells only. Therefore fusogenic oncolytic HSV should be no more toxic than its parental construct. Nonetheless, we proposed in the year 2 of this funded project to conduct extensive studies in animal models to confirm its safety in vivo. The results obtained so far from these experiments have demonstrated that the fusogenic oncolytic HSV is indeed not significantly more toxic than the
Exploitation and Benefits of BIM in Construction Project Management
NASA Astrophysics Data System (ADS)
Mesároš, Peter; Mandičák, Tomáš
2017-10-01
BIM is increasingly getting into the awareness in construction industry. BIM is the process of creating and data managing of the building during its life cycle. BIM became a part of management tools in modern construction companies. Construction projects have a number of participants. It means difficulty process of construction project management and a serious requirement for processing the huge amount of information including design, construction, time and cost parameters, economic efficiency and sustainability. Progressive information and communication technologies support cost management and management of construction project. One of them is Building Information Modelling. Aim of the paper is to examine the impact of BIM exploitation and benefits on construction project management in Slovak companies.
ERIC Educational Resources Information Center
McCartney, Elspeth; Boyle, James; Bannatyne, Susan; Jessiman, Emma; Campbell, Cathy; Kelsey, Cherry; Smith, Jennifer; O'Hare, Anne
2003-01-01
The construction of therapy protocols for a large-scale randomized controlled trial comparing speech and language therapists and assistants, and group and individual therapy approaches for children aged 6-11 in mainstream schools is outlined. The aim was to outline the decision-making processes that led to the construction of the research therapy…
42 CFR 137.362 - May construction project agreements be amended?
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 1 2010-10-01 2010-10-01 false May construction project agreements be amended? 137... of the Secretary in Establishing and Implementing Construction Project Agreements § 137.362 May construction project agreements be amended? Yes, the Self-Governance Tribe, at its discretion, may request the...
Code of Federal Regulations, 2010 CFR
2010-04-01
... contract. This does not involve construction project management as defined in paragraph (d) of this section...) Construction project management means direct responsibility for the construction project through day-to-day on-site management and administration of the project. Activities may include cost management, project...
Examining the Challenging Hindrances facing in the Construction Projects: South India’s Perspective
NASA Astrophysics Data System (ADS)
Subramanyam, K.; Haridharan, M. K.
2017-07-01
Developing countries like India require a huge infrastructure to facilitate needs of the people. Construction industry provides several opportunities to the individuals. Construction manager work is to supervise and organize the construction activities in construction projects. Now a day construction manager facing challenges. This paper aimed to study the challenges facing by the construction manager in the perception of construction professionals. 39 variables were taken from the literature review which found to be severe impact on construction managers’ performance. Construction manager, project manager and site engineers are the respondents for this survey. Using SPSS, regression analysis was done and recognized significant challenges. These challenges were classified into 5 domains. In management challenges, resource availability and allocation, risks and uncertainties existing in the project onsite, top management support and cost constraints are the most significant variables. In skills requirement of a construction manager challenges, technical skills required to learn and adapt new technology in the project, decision making and planning according to the situation in site are the most significant variables. In performance challenges, implementation of tasks according to the plan is the important variable whereas in onsite challenges, manage project risks, develop project policies and procedures are the most important.
Depression: The Differing Narratives of Couples in Couple Therapy
ERIC Educational Resources Information Center
Rautiainen, Eija-Liisa; Aaltonen, Jukka
2010-01-01
How does the spouse of a person with depression take part in constructing narratives of depression in couple therapy? In this study we examined couples' ways of co-constructing narratives of depression in couple therapy. Three couple therapy processes were chosen for the study, one spouse in each couple having been referred to an outpatient clinic…
48 CFR 236.274 - Restriction on acquisition of steel for use in military construction projects.
Code of Federal Regulations, 2013 CFR
2013-10-01
... of steel for use in military construction projects. 236.274 Section 236.274 Federal Acquisition....274 Restriction on acquisition of steel for use in military construction projects. In accordance with..., Division E), do not acquire, or allow a contractor to acquire, steel for any construction project or...
48 CFR 236.274 - Restriction on acquisition of steel for use in military construction projects.
Code of Federal Regulations, 2012 CFR
2012-10-01
... of steel for use in military construction projects. 236.274 Section 236.274 Federal Acquisition....274 Restriction on acquisition of steel for use in military construction projects. In accordance with..., Division E), do not acquire, or allow a contractor to acquire, steel for any construction project or...
48 CFR 236.274 - Restriction on acquisition of steel for use in military construction projects.
Code of Federal Regulations, 2014 CFR
2014-10-01
... of steel for use in military construction projects. 236.274 Section 236.274 Federal Acquisition....274 Restriction on acquisition of steel for use in military construction projects. In accordance with..., Division E), do not acquire, or allow a contractor to acquire, steel for any construction project or...
48 CFR 236.274 - Restriction on acquisition of steel for use in military construction projects.
Code of Federal Regulations, 2011 CFR
2011-10-01
... of steel for use in military construction projects. 236.274 Section 236.274 Federal Acquisition....274 Restriction on acquisition of steel for use in military construction projects. In accordance with..., Division E), do not acquire, or allow a contractor to acquire, steel for any construction project or...
48 CFR 236.274 - Restriction on acquisition of steel for use in military construction projects.
Code of Federal Regulations, 2010 CFR
2010-10-01
... of steel for use in military construction projects. 236.274 Section 236.274 Federal Acquisition....274 Restriction on acquisition of steel for use in military construction projects. In accordance with..., Division E), do not acquire, or allow a contractor to acquire, steel for any construction project or...
Construction Cost Growth for New Department of Energy Nuclear Facilities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kubic, Jr., William L.
Cost growth and construction delays are problems that plague many large construction projects including the construction of new Department of Energy (DOE) nuclear facilities. A study was conducted to evaluate cost growth of large DOE construction projects. The purpose of the study was to compile relevant data, consider the possible causes of cost growth, and recommend measures that could be used to avoid extreme cost growth in the future. Both large DOE and non-DOE construction projects were considered in this study. With the exception of Chemical and Metallurgical Research Building Replacement Project (CMRR) and the Mixed Oxide Fuel Fabrication Facilitymore » (MFFF), cost growth for DOE Nuclear facilities is comparable to the growth experienced in other mega construction projects. The largest increase in estimated cost was found to occur between early cost estimates and establishing the project baseline during detailed design. Once the project baseline was established, cost growth for DOE nuclear facilities was modest compared to non-DOE mega projects.« less
Mapping of information and identification of construction waste at project life cycle
NASA Astrophysics Data System (ADS)
Wibowo, Mochamad Agung; Handayani, Naniek Utami; Nurdiana, Asri; Sholeh, Moh Nur; Pamungkas, Gita Silvia
2018-03-01
The development of construction project towards green construction is needed in order to improve the efficiency of construction projects. One that needs to be minimized is construction waste. Construction waste is waste generated from construction project activities, both solid waste and non solid waste. More specifically, the waste happens at every phase of the project life cycle. Project life cycle are the stage of idea, design, construction, and operation/maintenance. Each phase is managed by different stakeholders. Therefore it requires special handling from the involved stakeholders. The objective of the study is to map the information and identify the waste at each phase of the project life cycle. The purpose of mapping is to figure out the process of information and product flow and with its timeline. This mapping used Value Stream Mapping (VSM). Identification of waste was done by distributing questionnaire to respondents to know the waste according to owner, consultant planner, contractor, and supervisory consultant. The result of the study is the mapping of information flow and product flow at the phases of idea, design, construction, and operation/ maintenance.
Effective Safety Management in Construction Project
NASA Astrophysics Data System (ADS)
Othman, I.; Shafiq, Nasir; Nuruddin, M. F.
2017-12-01
Effective safety management is one of the serious problems in the construction industry worldwide, especially in large-scale construction projects. There have been significant reductions in the number and the rate of injury over the last 20 years. Nevertheless, construction remains as one of the high risk industry. The purpose of this study is to examine safety management in the Malaysian construction industry, as well as to highlight the importance of construction safety management. The industry has contributed significantly to the economic growth of the country. However, when construction safety management is not implemented systematically, accidents will happen and this can affect the economic growth of the country. This study put the safety management in construction project as one of the important elements to project performance and success. The study emphasize on awareness and the factors that lead to the safety cases in construction project.
Research on cost control and management in high voltage transmission line construction
NASA Astrophysics Data System (ADS)
Xu, Xiaobin
2017-05-01
Enterprises. The cost control is of vital importance to the construction enterprises. It is the key to the profitability of the transmission line project, which is related to the survival and development of the electric power construction enterprises. Due to the long construction line, complex and changeable construction terrain as well as large construction costs of transmission line, it is difficult for us to take accurate and effective cost control on the project implementation of entire transmission line. Therefore, the cost control of transmission line project is a complicated and arduous task. It is of great theoretical and practical significance to study the cost control scheme of transmission line project by a more scientific and efficient way. Based on the characteristics of the construction project of the transmission line project, this paper analyzes the construction cost structure of the transmission line project and the current cost control problem of the transmission line project, and demonstrates the necessity and feasibility of studying the cost control scheme of the transmission line project more accurately. In this way, the dynamic cycle cost control process including plan, implementation, feedback, correction, modification and re-implement is achieved to realize the accurate and effective cost control of entire electric power transmission line project.
Research on the application of BIM technology in the whole life cycle of construction projects
NASA Astrophysics Data System (ADS)
Chang-liu, CHEN; Wei-wei, KOU; Shuai-hua, YE
2018-05-01
BIM technology can realize information sharing, and good BIM application will reduce the whole life cycle cost of construction projects. The popularization of BIM technology challenges the application of BIM technology at all stages of the whole life cycle of the construction project. It will give full play to the value of BIM, if developing a reasonable BIM project execution plan, defining BIM requirements, specifying Level of Development, determining the BIM quality control plan and clearing BIM application content of each stage, and will provide a unified method for project stakeholders, realize the whole life cycle of construction projects, and achieve the desired information sharing in construction project.
25 CFR 700.465 - Technical feasibility.
Code of Federal Regulations, 2010 CFR
2010-04-01
... construction, technology, or another engineering project, however, an application for a construction, technology or another engineering project shall: (a) Include sufficient information to determine the nature... construction, technology, or other engineering project prior to construction. The Commission shall review the...
25 CFR 700.465 - Technical feasibility.
Code of Federal Regulations, 2012 CFR
2012-04-01
... construction, technology, or another engineering project, however, an application for a construction, technology or another engineering project shall: (a) Include sufficient information to determine the nature... construction, technology, or other engineering project prior to construction. The Commission shall review the...
25 CFR 700.465 - Technical feasibility.
Code of Federal Regulations, 2014 CFR
2014-04-01
... construction, technology, or another engineering project, however, an application for a construction, technology or another engineering project shall: (a) Include sufficient information to determine the nature... construction, technology, or other engineering project prior to construction. The Commission shall review the...
25 CFR 700.465 - Technical feasibility.
Code of Federal Regulations, 2011 CFR
2011-04-01
... construction, technology, or another engineering project, however, an application for a construction, technology or another engineering project shall: (a) Include sufficient information to determine the nature... construction, technology, or other engineering project prior to construction. The Commission shall review the...
25 CFR 700.465 - Technical feasibility.
Code of Federal Regulations, 2013 CFR
2013-04-01
... construction, technology, or another engineering project, however, an application for a construction, technology or another engineering project shall: (a) Include sufficient information to determine the nature... construction, technology, or other engineering project prior to construction. The Commission shall review the...
Code of Federal Regulations, 2010 CFR
2010-10-01
... must be included in the construction project agreement? The construction project agreement must include..., and (d) An assurance that no action will be taken on the construction phase of the project that would... 42 Public Health 1 2010-10-01 2010-10-01 false What environmental considerations must be included...
Research on Green Construction Technology Applied at Guangzhou Hongding Building Project
NASA Astrophysics Data System (ADS)
Lou, Yong Zhong
2018-06-01
The green construction technology is the embodiment of sustainable development strategy in the construction industry, and it is a new construction mode which requires a higher environmental protection. Based on the Hongding building project, this paper describes the application and innovation of technical in the process of implementing green construction in the project, as well as the difficulties and characteristics in the specific practice; .The economic and social benefits of green construction are compared to the traditional construction model; .The achievements and experience of the green construction technology are summarized in the project; The ideas and methods in the process of implementing green construction are abstracted; some suggestions are put forward for the development of green construction.
42 CFR 137.327 - May multiple projects be included in a single construction project agreement?
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 1 2010-10-01 2010-10-01 false May multiple projects be included in a single construction project agreement? 137.327 Section 137.327 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF...-GOVERNANCE Construction Project Assumption Process § 137.327 May multiple projects be included in a single...
A design study of the energy selection system for carbon-ion therapy
NASA Astrophysics Data System (ADS)
Hahn, Garam; An, Dong Hyun; Hong, Bong Hwan; Kim, Geun Beom; Yim, Heejoong; Chang, Hong Seok; Jung, In Su; Kang, Kun Uk; Nam, Sang Hoon; Park, Inkyu
2015-02-01
KHIMA, a research project to construct a carbon radio-therapy facility in Korea, has been developing a superconducting cyclotron named KIRAMS-430 as a carbon(12 C 6+) particle accelerator. Due to the fixed beam energy of the cyclotron, an energy selection system (ESS) is required for treatment of tumors located at various depths in the human body. In the present paper, two design stages of the ESS are discussed. First, the beam tracks behind the degrader block and the statistical twiss parameters for the entire energy range were calculated by using the GEANT4 simulation toolkit. Analysis of the beam transmission and the contamination ratios were performed. In the second stage, the beam optics was designed to support the same phase profile at the end regardless of the variations in all of input twiss parameters and the emittance.
The communication in industrialised building system (IBS) construction project: Virtual environment
NASA Astrophysics Data System (ADS)
Pozin, Mohd Affendi Ahmad; Nawi, Mohd Nasrun Mohd
2017-10-01
Large portion of numbers team organization in the IBS construction sector is known are being fragmented. That is contributed from a segregation of construction activity thus create team working in virtually. Virtual team are the nature when teams are working in distributed area, across culture and time. Therefore, teams can be respond to the task without relocating to the site project and settle down a problem through information and communication technology (ICT). The emergence of virtual team are carry out by advancements in communication technologies as a medium to improve project team communication in project delivery process on IBS construction. Based on literature review from previous study and data collected from interviewing, this paper aim to identified communication challenges among project team members according to current project development practices in IBS construction project. Hence, in attempt to develop effective communication through the advantages of virtual team approach for IBS construction project. In order to ensure the data is gathered comprehensively and accurately, the data was collected from project managers by using semi structured interview method. It was found that virtual team approach could be enable competitive challenges on complexity in the construction project management process.
Highway construction related business impacts : phase 3 effort for the town of Dubois.
DOT National Transportation Integrated Search
2008-03-01
Highway construction projects not only impact the traveling public, but can also impact businesses situated adjacent to the construction project. Even : though construction projects are temporary situations, many businesses worry about the level of i...
Relationship between time management in construction industry and project management performance
NASA Astrophysics Data System (ADS)
Nasir, Najuwa; Nawi, Mohd Nasrun Mohd; Radzuan, Kamaruddin
2016-08-01
Nowadays, construction industry particularly in Malaysia struggle in achieving status of eminent time management for construction project. Project managers have a great responsibility to keep the project success under time of project completion. However, studies shows that delays especially in Malaysian construction industry still unresolved due to weakness in managing the project. In addition, quality of time management on construction projects is generally poor. Due to the progressively extended delays issue, time performance becomes an important subject to be explored to investigate delay factors. The method of this study is review of literature towards issues in construction industry which affecting time performance of project in general by focusing towards process involved for project management. Based on study, it was found that knowledge, commitment, cooperation are the main criteria as an overall to manage the project into a smooth process during project execution until completion. It can be concluded that, the strength between project manager and team members in these main criteria while conducting the project towards good time performance is highly needed. However, there is lack of establishment towards factors of poor time performance which strongly related with project management. Hence, this study has been conducted to establish factors of poor time performance and its relations with project management.
ERIC Educational Resources Information Center
Agron, Joe
1998-01-01
Examines building-cost trend data for educational facilities from the American School & University's 24th annual Official Education Construction Report for 1997. Data tables list education construction by projects completed; by projected spending; institution type; type of spending; projects projected for completion; and how construction costs…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-11
... Information Collection: Comment Request; Multifamily Project Construction Contract, Building Loan Agreement, and Construction Change Request AGENCY: Office of the Assistant Secretary for Housing, HUD. ACTION.... This Notice also lists the following information: Title of Proposal: Multifamily Project Construction...
7 CFR 1726.403 - Project construction contract closeout.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 11 2011-01-01 2011-01-01 false Project construction contract closeout. 1726.403... SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract Closeout § 1726.403 Project construction contract closeout. This section is applicable to contracts executed on...
7 CFR 1726.403 - Project construction contract closeout.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 11 2010-01-01 2010-01-01 false Project construction contract closeout. 1726.403... SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract Closeout § 1726.403 Project construction contract closeout. This section is applicable to contracts executed on...
7 CFR 1726.403 - Project construction contract closeout.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 11 2013-01-01 2013-01-01 false Project construction contract closeout. 1726.403... SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract Closeout § 1726.403 Project construction contract closeout. This section is applicable to contracts executed on...
7 CFR 1726.403 - Project construction contract closeout.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 7 Agriculture 11 2014-01-01 2014-01-01 false Project construction contract closeout. 1726.403... SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract Closeout § 1726.403 Project construction contract closeout. This section is applicable to contracts executed on...
7 CFR 1726.403 - Project construction contract closeout.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 7 Agriculture 11 2012-01-01 2012-01-01 false Project construction contract closeout. 1726.403... SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract Closeout § 1726.403 Project construction contract closeout. This section is applicable to contracts executed on...
NCI support for particle therapy: past, present, future.
Deye, James A
2012-11-01
In light of the rising worldwide interest in particle therapy, and proton therapy specifically in the United States, the National Cancer Institute (NCI) is being asked more often about funding for such research and facilities. Many of the questions imply that NCI is naive to the exciting possibilities inherent in particle therapies, and thus they wish to encourage NCI to initiate and underwrite such programs. In fact, NCI has a long track record of support for the translation of hadrons from the physics laboratory to the therapy clinic by way of technology development and scientific investigations of physical and biological processes as well as clinical outcomes. Early work has included continuous funding since 1961 of proton treatments for more than 15,000 patients and facility construction at the Harvard/Massachusetts General Hospital (MGH) site; treatment of 227 patients with the pi-meson facility at Los Alamos between 1974 and 1981; funding of more than $69M for seven neutron therapy centers between 1971 and 1989; many funded projects in boron neutron capture radiation therapy through the present time; and numerous radiobiology projects over the past 50 y. NCI continues to play an active role in the incorporation of protons into randomized clinical trials through the Children's Oncology Group, Radiation Therapy Oncology Group, and the Program Project Grant (P01), which is co-directed by the MGH and MD Anderson Cancer Center. This has required funding development and implementation of guidelines that enable intercomparison of dosimetry and treatment between facilities. NCI has also funded recent efforts to develop new physical processes for the production of particles such as protons. With regard to the future, while it is true that there are no specific funding opportunity announcements directed to particle therapy research, it is also true that NCI remains open to reviewing any research that is compatible with an established mechanism. However, given the very substantial resources that these facilities currently require along with the highly competitive economic environment that now exists, it is clear that scientific review of such grant applications will look to leverage the scientific pursuits that are the NCI mandate with the reality of the clinical practices, just as is the case for photon radiation research. Such leveraging should be enhanced by the growing opportunities and need for international collaborations. On the other hand, these collaborations are complicated by the fact that these particle therapies are now fully reimbursable modalities, which makes it difficult to separate research (the NCI mission) from clinical practice development. This paper seeks to illuminate these new realities in order to encourage the pursuit and funding of the scientific underpinnings of physical methods, radiobiology, and clinical practice with particle therapy.
Improvement of the cost-benefit analysis algorithm for high-rise construction projects
NASA Astrophysics Data System (ADS)
Gafurov, Andrey; Skotarenko, Oksana; Plotnikov, Vladimir
2018-03-01
The specific nature of high-rise investment projects entailing long-term construction, high risks, etc. implies a need to improve the standard algorithm of cost-benefit analysis. An improved algorithm is described in the article. For development of the improved algorithm of cost-benefit analysis for high-rise construction projects, the following methods were used: weighted average cost of capital, dynamic cost-benefit analysis of investment projects, risk mapping, scenario analysis, sensitivity analysis of critical ratios, etc. This comprehensive approach helped to adapt the original algorithm to feasibility objectives in high-rise construction. The authors put together the algorithm of cost-benefit analysis for high-rise construction projects on the basis of risk mapping and sensitivity analysis of critical ratios. The suggested project risk management algorithms greatly expand the standard algorithm of cost-benefit analysis in investment projects, namely: the "Project analysis scenario" flowchart, improving quality and reliability of forecasting reports in investment projects; the main stages of cash flow adjustment based on risk mapping for better cost-benefit project analysis provided the broad range of risks in high-rise construction; analysis of dynamic cost-benefit values considering project sensitivity to crucial variables, improving flexibility in implementation of high-rise projects.
25 CFR 1000.240 - What construction programs included in an AFA are subject to this subpart?
Code of Federal Regulations, 2010 CFR
2010-04-01
..., coordination, responsibility for the construction project, day-to-day on-site management on site-management and administration of the project, which may include cost management, project budgeting, project scheduling and... Tribal, facilities and projects. (b) The following programs and activities are not construction programs...
ERIC Educational Resources Information Center
Wang, Heng
2017-01-01
Construction project productivity typically lags other industries and it has been the focus of numerous studies in order to improve the project performance. This research investigated the application of Radio Frequency Identification (RFID) technology on construction projects' supply chain and determined that RFID technology can improve the…
13 CFR 308.1 - Use of funds in Projects constructed under projected cost.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Use of funds in Projects constructed under projected cost. 308.1 Section 308.1 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION, DEPARTMENT OF COMMERCE PERFORMANCE INCENTIVES § 308.1 Use of funds in Projects constructed under...
Application of BIM technology in construction bidding
NASA Astrophysics Data System (ADS)
wei, Li
2017-12-01
bidding is a very important step of construction project. For the owners, bidding is the key link of selecting the best construction plan and saving the project cost to the maximum extent. For Construction Corporation, it is the key to show their construction technology which can improve the probability of winning the bid. this paper researches on the application of BIM technology in bidding process of construction project in detail, and discussesthe application of BIM technology in construction field comprehensively.
The Application of the Real Options Method for the Evaluation of High-Rise Construction Projects
NASA Astrophysics Data System (ADS)
Izotov, Aleksandr; Rostova, Olga; Dubgorn, Alissa
2018-03-01
The paper is devoted to the problem of evaluation of high-rise construction projects in a rapidly changing environment. The authors proposed an algorithm for constructing and embedding real options in high-rise construction projects, which makes it possible to increase the flexibility of managing multi-stage projects that have the ability to adapt to changing conditions of implementation.
Methodology of project management at implementation of projects of high-rise construction
NASA Astrophysics Data System (ADS)
Papelniuk, Oksana
2018-03-01
High-rise construction is the perspective direction in urban development. An opportunity to arrange on rather small land plot a huge number of the living and commercial space makes high-rise construction very attractive for developers. However investment projects of high-rise buildings' construction are very expensive and complex that sets a task of effective management of such projects for the company builder. The best tool in this area today is the methodology of project management, which becomes a key factor of efficiency.
Lawlor, M C; Mattingly, C F
2001-01-01
Ethnographic research involves the creation and ongoing renegotiations of relationships between researchers and informants. Prolonged engagement contributes to the complexity as relationships deepen and shift over time and participants accumulate a substantial reservoir of shared experiences. Reflections about the relationships we have co-constructed with informants in several research projects have contributed to our identification of several critical aspects of building and maintaining researcher-informant relationships in cross-cultural research. Aspects of relationship work specifically related to conducting ethnography with children, within the communities in which researchers live, and within the practice of occupational therapy are discussed.
24 CFR 941.402 - Project design and construction.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Project design and construction... URBAN DEVELOPMENT PUBLIC HOUSING DEVELOPMENT Project Development § 941.402 Project design and.... A PHA may certify that its proposed design and construction plans for the development are in...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-02
... Proposed Information Collection to OMB; Multifamily Project Construction Contract, Building Loan Agreement, & Construction Change; HUD Programs AGENCY: Office of the Chief Information Officer, HUD. ACTION: Notice. SUMMARY.../borrowers, and mortgagees/lenders for construction of multifamily projects and to obtain approval of changes...
Construction project management handbook.
DOT National Transportation Integrated Search
2012-03-01
The purpose of the FTA Construction Project Management Handbook is to provide guidelines for use by public transit agencies (Agen-cies) undertaking substantial construction projects, either for the first time or with little prior experience with cons...
Monitoring Environmental Performance Commitments in Construction Projects.
DOT National Transportation Integrated Search
2007-05-01
EPCs are measures implemented during project construction to reduce environmental impacts. These commitments are directed toward the Projects performance period only and focus primarily on reducing the impacts of construction equipment and trucks....
NASA Astrophysics Data System (ADS)
Krechowicz, Maria
2017-10-01
Nowadays, one of the characteristic features of construction industry is an increased complexity of a growing number of projects. Almost each construction project is unique, has its project-specific purpose, its own project structural complexity, owner’s expectations, ground conditions unique to a certain location, and its own dynamics. Failure costs and costs resulting from unforeseen problems in complex construction projects are very high. Project complexity drivers pose many vulnerabilities to a successful completion of a number of projects. This paper discusses the process of effective risk management in complex construction projects in which renewable energy sources were used, on the example of the realization phase of the ENERGIS teaching-laboratory building, from the point of view of DORBUD S.A., its general contractor. This paper suggests a new approach to risk management for complex construction projects in which renewable energy sources were applied. The risk management process was divided into six stages: gathering information, identification of the top, critical project risks resulting from the project complexity, construction of the fault tree for each top, critical risks, logical analysis of the fault tree, quantitative risk assessment applying fuzzy logic and development of risk response strategy. A new methodology for the qualitative and quantitative risk assessment for top, critical risks in complex construction projects was developed. Risk assessment was carried out applying Fuzzy Fault Tree analysis on the example of one top critical risk. Application of the Fuzzy sets theory to the proposed model allowed to decrease uncertainty and eliminate problems with gaining the crisp values of the basic events probability, common during expert risk assessment with the objective to give the exact risk score of each unwanted event probability.
41 CFR 102-74.135 - Who selects construction and alteration projects that are to be performed?
Code of Federal Regulations, 2010 CFR
2010-07-01
... and alteration projects that are to be performed? 102-74.135 Section 102-74.135 Public Contracts and... construction and alteration projects that are to be performed? The Administrator of General Services selects construction and alteration projects to be performed. ...
Target development for 67Cu, 82Sr radionuclide production at the RIC-80 facility
NASA Astrophysics Data System (ADS)
Panteleev, V. N.; Barzakh, A. E.; Batist, L. Kh.; Fedorov, D. V.; Ivanov, V. S.; Krotov, S. A.; Molkanov, P. L.; Moroz, F. V.; Orlov, S. Yu.; Volkov, Yu. M.
2018-01-01
A high-current cyclotron C-80 capable of producing 40-80 MeV proton beams with a current of up to 200 μA has been constructed and commissioned at PNPI (Petersburg Nuclear Physics Institute). One of the main goals of cyclotron C-80 is the production of a wide spectrum of medical radionuclides for diagnostics and therapy. To date, the project development of a radioisotope facility RIC-80 (radioisotopes at cyclotron C-80) has been completed. The feature of the project is the use of a mass-separator combined with the ion-target device for obtaining ion beams of radioisotopes with a high purity of separation that is especially important for medical applications. The first results of a new high-temperature method for extracting 82Sr and 67Cu radioisotopes from irradiated targets have been presented.
Construction project management handbook : September 2009.
DOT National Transportation Integrated Search
2009-09-01
The purpose of this Handbook is to provide guidelines for use by public transit agencies (Agencies) undertaking substantial construction : projects, either for the first time or with little prior experience with construction project management. It pr...
[A mini-review of targeting gene-virotherapy of cancer].
Liu, Xin-Yuan; Gu, Jin-Fa
2006-10-01
New progress has been made on the project "targeting gene-virotherapy of cancer" proposed by us, which is "targeting dual gene-virotherapy of cancer". By the use of two genes, all the xenograft tumors in nude mice could be completely eliminated. The researches have been published in international journals, such as Hepatology and Cancer Research (a highlight paper). In this study, a further superior strategy--"double targeting virus-dual gene therapy" was introduced. This strategy was specialized by the use of tumor specific promoter to control the tumor specific suppressor gene, such as alpha-fetoprotein (AFP), which controls hepatoma specific suppressor gene LFIRE or HCCS1. In addition, a second tumor specific promoter, such as hTERT or survivin was used to control E1A or E1B in the construct, as hTERT-E1A-AFP-E1B-HCCS1 or LFIRE, a double tumor specific promoter controlling hepatoma specific LFIRE or HCCS1 gene. By the combined use of this construct with a very strong antitumor construct, such as hTERT-E1A-AFP-E1B-IL-24, a strategy with both excellent tumor killing effect and excellent safety with very little damage to normal cells was obtained. Therefore, double targeting virus-dual gene therapy might be one of the most potential strategies for cancer treatment. Furthermore, a new type of interferon was also introduced, which might be an ideal antitumor drug.
ERIC Educational Resources Information Center
Argon, Joe, Ed.; Spoor, Dana L.; Cox, Susan M.; Brown, Andrew; Ray, Jennifer
1998-01-01
Presents a series of articles that examine decision making in school construction and renovation projects. Topics include preparing for a construction project, purchasing windows that provide protection at a reasonable cost, choosing the best flooring and carpeting, and dealing with deregulation. An industry roundtable discussion on project…
14 CFR 151.47 - Performance of construction work: Letting of contracts.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Performance of construction work: Letting... Development Projects § 151.47 Performance of construction work: Letting of contracts. (a) Advertising required... project, each contract for construction work on a project in the amount of more than $2,000 must be...
14 CFR 151.47 - Performance of construction work: Letting of contracts.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Performance of construction work: Letting... Development Projects § 151.47 Performance of construction work: Letting of contracts. (a) Advertising required... project, each contract for construction work on a project in the amount of more than $2,000 must be...
14 CFR 151.47 - Performance of construction work: Letting of contracts.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Performance of construction work: Letting... Development Projects § 151.47 Performance of construction work: Letting of contracts. (a) Advertising required... project, each contract for construction work on a project in the amount of more than $2,000 must be...
14 CFR 151.47 - Performance of construction work: Letting of contracts.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Performance of construction work: Letting... Development Projects § 151.47 Performance of construction work: Letting of contracts. (a) Advertising required... project, each contract for construction work on a project in the amount of more than $2,000 must be...
Yajima, Airi; Uesawa, Yoshihiro; Ogawa, Chiaki; Yatabe, Megumi; Kondo, Naoki; Saito, Shinichiro; Suzuki, Yoshihiko; Atsuda, Kouichiro; Kagaya, Hajime
2015-05-01
There exist various useful predictive models, such as the Cockcroft-Gault model, for estimating creatinine clearance (CLcr). However, the prediction of renal function is difficult in patients with cancer treated with cisplatin. Therefore, we attempted to construct a new model for predicting CLcr in such patients. Japanese patients with head and neck cancer who had received cisplatin-based chemotherapy were used as subjects. A multiple regression equation was constructed as a model for predicting CLcr values based on background and laboratory data. A model for predicting CLcr, which included body surface area, serum creatinine and albumin, was constructed. The model exhibited good performance prior to cisplatin therapy. In addition, it performed better than previously reported models after cisplatin therapy. The predictive model constructed in the present study displayed excellent potential and was useful for estimating the renal function of patients treated with cisplatin therapy. Copyright© 2015 International Institute of Anticancer Research (Dr. John G. Delinassios), All rights reserved.
Electronic construction collaboration system -- final phase : [tech transfer summary].
DOT National Transportation Integrated Search
2014-07-01
Construction projects have been growing more complex in terms of : project team composition, design aspects, and construction processes. : To help manage the shop/working drawings and requests for information : (RFIs) for its large, complex projects,...
Enhancements to highway construction scheduling expert system.
DOT National Transportation Integrated Search
2015-05-01
This research was performed to enhance the software tool (Illinois Construction Scheduling Expert : System, ICSES) developed in Phase I of this project (ICT project R27-86) by mining data collected on : IDOT construction projects and differentiating ...
van Reedt Dortland, Maartje; Dewulf, Geert; Voordijk, Hans
2013-01-01
Exploring the impact of the type of project coalition on types of flexibility by analyzing considered and exercised flexibilities in separated and integrated project coalitions in the design and construction phase and the operations and maintenance phase of a healthcare construction project. Flexibility in healthcare construction projects is increasingly needed in order to deal with growing uncertainties. Until now, little research has been carried out on how and to what extent flexibility is incorporated in different types of project coalitions chosen by healthcare organizations. An exploratory survey was conducted among health organizations in both cure and care. Questions were asked on the position of the real estate department within the organization, the type of project coalitions chosen and the rationale behind this choice, and the extent to which flexibility in terms of a real option was considered and to what extent it had been exercised in a project coalition. Integrated project coalitions pay more attention to flexibility in advance in both the process and the product, but exercise them to a lesser extent than separated project coalitions. The economic feasibility of real options is higher in integrated project coalitions. The study shows that real options thinking is already incorporated in real estate management of healthcare organizations, although more flexibility is considered in advance of the project than is actually realized during and after construction. Built environment, construction, decision making, hospitals, planning.
Influence of Selected Stakeholders of Construction Investment Projects on the Course of Project
NASA Astrophysics Data System (ADS)
Bizon-Górecka, Jadwiga; Górecki, Jarosław
2017-10-01
The article presents an entity perspective of the construction investment projects. In a course of the project there are stakeholders who have an indirect influence (e.g. decision-makers in the selection of projects) or a direct influence (e.g. members of the project team). An intuitive opinion about a significant influence of project stakeholders on the project’s course encouraged the authors to undertake a research in this area. The article illustrates the initial phases of the construction project life cycle in a perspective of the entities and, in particular, a role of different stakeholders in making decisions that affect a course of the project. An analysis of the structure of the construction project life cycle makes a substantial involvement of various subjects in the initial phases of the project, i.e. in an initial phase and during a creation of the structures. A key point is to underline the factors of decision-making by the participants of the construction process. It was indicated that the stakeholders have a different impact on the course of the project. In large projects, which have many stakeholders, their role in the implementation of the investment project can vary, depending on the life cycle of the project. They can have positive or negative impacts on achieving the project objectives. The paper presents the results of 100 surveys made among participants of the building processes, executors of the construction projects in the Kuyavian-Pomeranian region. The study was conducted in December 2016 and January 2017. It revealed what is the impact of individual stakeholders of the construction projects on the course of the project. A special attention was paid to a complex relationship between objectives of the project and stakeholders’ goals. A great care to the smallest possible number of risks, which may arise from the different objectives of the project and its stakeholders’ goals, should be focused on the augmentation of correlation of measures of the goals. It is crucial to identify the stakeholders, whereas it is a continuous and quite difficult process. However, when ignoring the impact of specific stakeholders on the implementation of the project, a duration of the project and its costs may increase. A main problem, in establishing a relationship of participants in the construction process, is to take into account the risk of all project stakeholders.
Leveraging Text Content for Management of Construction Project Documents
ERIC Educational Resources Information Center
Alqady, Mohammed
2012-01-01
The construction industry is a knowledge intensive industry. Thousands of documents are generated by construction projects. Documents, as information carriers, must be managed effectively to ensure successful project management. The fact that a single project can produce thousands of documents and that a lot of the documents are generated in a…
Using mobile computers to automate the inspection process for highway construction projects.
DOT National Transportation Integrated Search
2013-12-01
Highway construction projects are characterized by the large amount of data that needs to be collected, processed, and exchanged among the : different project participants. Collection of construction inspection data, in particular, allows field perso...
Evaluation of recycled projects for performance : final report.
DOT National Transportation Integrated Search
1995-04-01
Louisiana constructed two hot mix recycling projects in 1978 in order to determine the feasibility of this technology with respect to design and construction. In 1980-81 four recycled projects were constructed to examine the variations found in recyc...
Bonded concrete overlay performance in Illinois
DOT National Transportation Integrated Search
2002-04-01
Two bonded concrete overlay rehabilitation projects were constructed in Illinois during the 1990's. The first project was constructed in 1994 and 1995 on Interstate 80, east of Moline. The second project was constructed in 1996 on Interstate 88 near ...
NASA Astrophysics Data System (ADS)
Venkrbec, Vaclav; Bittnerova, Lucie
2017-12-01
Building information modeling (BIM) can support effectiveness during many activities in the AEC industry. even when processing a construction-technological project. This paper presents an approach how to use building information model in higher education, especially during the work on diploma thesis and it supervision. Diploma thesis is project based work, which aims to compile a construction-technological project for a selected construction. The paper describes the use of input data, working with them and compares this process with standard input data such as printed design documentation. The effectiveness of using the building information model as a input data for construction-technological project is described in the conclusion.
Contractors perspective for critical factors of cost overrun in highway projects of Sindh, Pakistan
NASA Astrophysics Data System (ADS)
Sohu, Samiullah; Abdullah, Abd Halid; Nagapan, Sasitharan; Fattah, Abdul; Ullah, Kaleem; Kumar, Kanesh
2017-10-01
Construction industry of Pakistan is creating a number of opportunities in employment as well as plays a role model for economy development of the country. This construction industry has a serious issue of cost overrun in all construction projects especially in construction of highway projects. Cost overrun is a serious and critical issue in construction of highway projects which gives negative impact to construction practitioners because it is not only cross the approved budget but also approved time of the project. The main objective of this study is to find out critical factors causing cost overrun in highway projects of Sindh according to contractors' perspectives. Deep literature review was carried out and a total of 64 factors of cost overrun were identified. To achieve the objective, a questionnaire was designed and distributed among 16 selected respondents who have more than 20 years of experience in construction of highway projects. The results from analysis found that most critical factors of cost overrun in the order of importance include financial and cash flow difficulties faced by contractor, frequent changes in design, changes in price of materials, poor planning by client, change in scope of project, change in specification of materials and delay in taking decisions. This study will assist contractors to narrow down some of the critical factors that would lead to cost overrun, and therefore be prepared with the ways to mitigate these problems in construction of highway projects of Sindh province.
Efficient Project Delivery Using Lean Principles - An Indian Case Study
NASA Astrophysics Data System (ADS)
Kovvuri, P. Ramachandra Reddy; Sawhney, Anil; Ahuja, Ritu; Sreekumar, Aiswarya
2016-03-01
Construction industry in India is growing at a rapid pace. Along with this growth, the industry is facing numerous challenges that are making delivery of projects inefficient. Experts believe that capacity constraints in the industry need to be addressed immediately. Government has recommended `introduction of efficient technologies and modern management techniques' to increase the productivity of the industry. In this context, lean principles can act as a lever to make project delivery more efficient and provide the much needed impetus to the Indian construction sector. Around the globe lean principles are showing positive results on the projects. Project teams are reporting improvements in construction time, cost and quality along with softer benefits of enhanced collaboration, coordination and trust in project teams. Can adoption of lean principles provide similar benefits in the Indian construction sector? This research was conducted to answer this question. Using an action research approach a key lean construction tool called Last Planner System (LPS) was tested on a large Indian construction project. The work described in this work investigates the improvements achieved in project delivery by adopting LPS in Indian construction sector. Comparison in pre- and post-implementation data demonstrates increase in the certainty of work-flow and improves schedule compliance. This is measured through a simple LPS metric called percent plan complete. Explicit improvements in schedule performance are seen during 8 week LPS implementation along with implicit improvements in coordination, collaboration and trust in the project team. This work reports the findings of LPS implementation on the case study project outlining the barriers and drivers to adoption, strategies needed to ensure successful implementation and roadmap for implementation. Based on the findings the authors envision that lean construction can make project delivery more efficient in India.
Infection control in design and construction work.
Collinge, William H
2015-01-01
To clarify how infection control requirements are represented, communicated, and understood in work interactions through the medical facility construction project life cycle. To assist project participants with effective infection control management by highlighting the nature of such requirements and presenting recommendations to aid practice. A 4-year study regarding client requirement representation and use on National Health Service construction projects in the United Kingdom provided empirical evidence of infection control requirement communication and understanding through design and construction work interactions. An analysis of construction project resources (e.g., infection control regulations and room data sheets) was combined with semi-structured interviews with hospital client employees and design and construction professionals to provide valuable insights into the management of infection control issues. Infection control requirements are representationally indistinct but also omnipresent through all phases of the construction project life cycle: Failure to recognize their nature, relevance, and significance can result in delays, stoppages, and redesign work. Construction project resources (e.g., regulatory guidance and room data sheets) can mask or obscure the meaning of infection control issues. A preemptive identification of issues combined with knowledge sharing activities among project stakeholders can enable infection control requirements to be properly understood and addressed. Such initiatives should also reference existing infection control regulatory guidance and advice. © The Author(s) 2015.
NASA Astrophysics Data System (ADS)
Low, W. W.; Wong, K. S.; Lee, J. L.
2018-04-01
With the growth of economy and population, there is an increase in infrastructure construction projects. As such, it is unavoidable to have construction projects on soft soil. Without proper risk management plan, construction projects are vulnerable to different types of risks which will have negative impact on project’s time, cost and quality. Literature review showed that little or none of the research is focused on the risk assessment on the infrastructure project in soft soil. Hence, the aim of this research is to propose a risk assessment framework in infrastructure projects in soft soil during the construction stage. This research was focused on the impact of risks on project time and internal risk factors. The research method was Analytical Hierarchy Process and the sample population was experienced industry experts who have experience in infrastructure projects. Analysis was completed and result showed that for internal factors, the five most significant risks on time element are lack of special equipment, potential contractual disputes and claims, shortage of skilled workers, delay/lack of materials supply, and insolvency of contractor/sub-contractor. Results indicated that resources risk factor play a critical role on project time frame in infrastructure projects in soft soil during the construction stage.
Code of Federal Regulations, 2014 CFR
2014-10-01
... further study and selection of one project for final design, engineering, and construction funding. 268.21... and selection of one project for final design, engineering, and construction funding. (a) Upon... analyses necessary prior to initiation of construction. Final design and engineering work will also be...
Code of Federal Regulations, 2010 CFR
2010-10-01
... further study and selection of one project for final design, engineering, and construction funding. 268.21... and selection of one project for final design, engineering, and construction funding. (a) Upon... analyses necessary prior to initiation of construction. Final design and engineering work will also be...
Code of Federal Regulations, 2011 CFR
2011-10-01
... further study and selection of one project for final design, engineering, and construction funding. 268.21... and selection of one project for final design, engineering, and construction funding. (a) Upon... analyses necessary prior to initiation of construction. Final design and engineering work will also be...
Code of Federal Regulations, 2012 CFR
2012-10-01
... further study and selection of one project for final design, engineering, and construction funding. 268.21... and selection of one project for final design, engineering, and construction funding. (a) Upon... analyses necessary prior to initiation of construction. Final design and engineering work will also be...
Code of Federal Regulations, 2013 CFR
2013-10-01
... further study and selection of one project for final design, engineering, and construction funding. 268.21... and selection of one project for final design, engineering, and construction funding. (a) Upon... analyses necessary prior to initiation of construction. Final design and engineering work will also be...
Risks Associated with Federal Construction Projects
2011-06-01
awarding contracts for construction projects (USACE, 2010). BIM offers a method to effectively design a facility while maximizing work performance during...includes Requirements, Programming, Funding, Solicitation, AEC Evaluation, Award , Project Validation, Design and Construction, and Project Management...includes the Solicitation, AEC Evaluation, and Award Steps. In this Phase, BIM is only used in the Solicitation and the AEC Evaluation steps
NASA Astrophysics Data System (ADS)
Vaynshtok, Natalia
2017-10-01
The article provides the results of development of the methodology for construction compliance monitoring in the crediting of investment projects for road construction. Work scope analysis of construction audit was conducted and an algorithm of financial audit in the crediting investment projects was developed. Furthermore, the possible pitfalls and abuses of counterparties were investigated and recommendations were given allowing the bank to receive objective and independent information on the progress of the project in real time. This mechanism is useful for the bank in insurance of possible risks, targeted and rational use of credit funds.
Hadron Therapy in Latin America
NASA Astrophysics Data System (ADS)
Kreiner, A. J.; Bergueiro, J.; Burlon, A. A.; Di Paolo, H.; Castell, W.; Thatar Vento, V.; Levinas, P.; Cartelli, D.; Kesque, J. M.; Valda, A. A.; Ilardo, J. C.; Baldo, M.; Erhardt, J.; Debray, M. E.; Somacal, H. R.; Minsky, D. M.; Estrada, L.; Hazarabedian, A.; Johann, F.; Suarez Sandin, J. C.; Igarzabal, M.; Huck, H.; Repetto, M.; Obligado, M.; Lell, J.; Padulo, J.; Herrera, M.; Gonzalez, S. R.; Capoulat, M. E.; Davidson, J.; Davidson, M.
2010-08-01
The use of proton and heavy ion beams for radiotherapy is a well established cancer treatment modality in the first world, which is becoming increasingly widespread, due to its clear advantages over conventional photon-based treatments. This strategy is suitable when the tumor is spatially well localized. Also the use of neutrons has tradition. Here Boron Neutron Capture Therapy (BNCT) stands out, though on a much smaller scale, being a promising alternative for tumors which are diffuse and infiltrating. On this sector, so far only nuclear reactors have been used as neutron sources. In this paper we briefly describe the situation in Latin America and in particular we discuss the present status of an ongoing project to develop a folded Tandem-ElectroStatic-Quadrupole (TESQ) accelerator for Accelerator-Based (AB)-Boron Neutron Capture Therapy (BNCT) at the Atomic Energy Commission of Argentina. The project goal is a machine capable of delivering 30 mA of 2.4 MeV protons to be used in conjunction with a neutron production target based on the 7Li(p,n)7Be reaction. These are the specifications needed to produce sufficiently intense and clean epithermal neutron beams to perform BNCT for deep-seated tumors in less than an hour. The machine being currently designed and constructed is a folded TESQ with a terminal at 0.6 MV as a smaller scale prototype. Since the concept is modular the same structure will be used for the 1.2 MV final accelerator.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-21
... Construction Contract, Building Loan Agreement, & Construction Change Request AGENCY: Office of the Chief... Information Collection Title of Information Collection: Multifamily Project Construction Contract, Building Loan Agreement, & Construction Change Request. OMB Approval Number: 2502-0011. Type of Request...
Code of Federal Regulations, 2010 CFR
2010-10-01
... FACILITY CONSTRUCTION AND MODERNIZATION Project Grants for Public Medical Facility Construction and... authority, or public or quasi-public corporation for a project described in paragraph (b) of this section.... (b) Eligible project. A grant under section 1625 may be made only for a construction and/or...
Feasibility of a simple method of hybrid collimation for megavoltage grid therapy
DOE Office of Scientific and Technical Information (OSTI.GOV)
Almendral, Pedro; Mancha, Pedro J.; Roberto, Daniel
2013-05-15
Purpose: Megavoltage grid therapy is currently delivered with step-and-shoot multisegment techniques or using a high attenuation block with divergent holes. However, the commercial availability of grid blocks is limited, their construction is difficult, and step-and-shoot techniques require longer treatment times and are not practical with some multileaf collimators. This work studies the feasibility of a hybrid collimation system for grid therapy that does not require multiple segments and can be easily implemented with widely available technical means. Methods: The authors have developed a system to generate a grid of beamlets by the simultaneous use of two perpendicular sets of equallymore » spaced leaves that project stripe patterns in orthogonal directions. One of them is generated with the multileaf collimator integrated in the accelerator and the other with an in-house made collimator constructed with a low melting point alloy commonly available at radiation oncology departments. The characteristics of the grid fields for 6 and 18 MV have been studied with a shielded diode, an unshielded diode, and radiochromic film. Results: The grid obtained with the hybrid collimation is similar to some of the grids used clinically with respect to the beamlet size (about 1 cm) and the percentage of open beam (1/4 of the total field). The grid fields are less penetrating than the open fields of the same energy. Depending on the depth and the direction of the profiles (diagonal or along the principal axes), the measured valley-to-peak dose ratios range from 5% to 16% for 6 MV and from 9% to 20% for 18 MV. All the detectors yield similar results in the measurement of profiles and percent depth dose, but the shielded diode seems to overestimate the output factors. Conclusions: The combination of two stripe pattern collimators in orthogonal directions is a feasible method to obtain two-dimensional arrays of beamlets and has potential usefulness as an efficient way to deliver grid therapy. The implementation of this method is technically simpler than the construction of a conventional grid block.« less
Feasibility of a simple method of hybrid collimation for megavoltage grid therapy.
Almendral, Pedro; Mancha, Pedro J; Roberto, Daniel
2013-05-01
Megavoltage grid therapy is currently delivered with step-and-shoot multisegment techniques or using a high attenuation block with divergent holes. However, the commercial availability of grid blocks is limited, their construction is difficult, and step-and-shoot techniques require longer treatment times and are not practical with some multileaf collimators. This work studies the feasibility of a hybrid collimation system for grid therapy that does not require multiple segments and can be easily implemented with widely available technical means. The authors have developed a system to generate a grid of beamlets by the simultaneous use of two perpendicular sets of equally spaced leaves that project stripe patterns in orthogonal directions. One of them is generated with the multileaf collimator integrated in the accelerator and the other with an in-house made collimator constructed with a low melting point alloy commonly available at radiation oncology departments. The characteristics of the grid fields for 6 and 18 MV have been studied with a shielded diode, an unshielded diode, and radiochromic film. The grid obtained with the hybrid collimation is similar to some of the grids used clinically with respect to the beamlet size (about 1 cm) and the percentage of open beam (1/4 of the total field). The grid fields are less penetrating than the open fields of the same energy. Depending on the depth and the direction of the profiles (diagonal or along the principal axes), the measured valley-to-peak dose ratios range from 5% to 16% for 6 MV and from 9% to 20% for 18 MV. All the detectors yield similar results in the measurement of profiles and percent depth dose, but the shielded diode seems to overestimate the output factors. The combination of two stripe pattern collimators in orthogonal directions is a feasible method to obtain two-dimensional arrays of beamlets and has potential usefulness as an efficient way to deliver grid therapy. The implementation of this method is technically simpler than the construction of a conventional grid block.
Study of Collaborative Management for Transportation Construction Project Based on BIM Technology
NASA Astrophysics Data System (ADS)
Jianhua, Liu; Genchuan, Luo; Daiquan, Liu; Wenlei, Li; Bowen, Feng
2018-03-01
Abstract. Building Information Modeling(BIM) is a building modeling technology based on the relevant information data of the construction project. It is an advanced technology and management concept, which is widely used in the whole life cycle process of planning, design, construction and operation. Based on BIM technology, transportation construction project collaborative management can have better communication through authenticity simulation and architectural visualization and can obtain the basic and real-time information such as project schedule, engineering quality, cost and environmental impact etc. The main services of highway construction management are integrated on the unified BIM platform for collaborative management to realize information intercommunication and exchange, to change the isolated situation of information in the past, and improve the level of information management. The final BIM model is integrated not only for the information management of project and the integration of preliminary documents and design drawings, but also for the automatic generation of completion data and final accounts, which covers the whole life cycle of traffic construction projects and lays a good foundation for smart highway construction.
Effective factor of virtual team: Resolving communication breakdown in IBS construction project
NASA Astrophysics Data System (ADS)
Pozin, Mohd Affendi Ahmad; Nawi, Mohd. Nasrun Mohd.
2016-08-01
Currently, rapid development of information technology has provided new opportunities to organisation toward increasing the effectiveness of collaboration and teamwork management. Thus the virtual team approach has been implemented in numerous of field. However, there is limited study of virtual team in construction project management. Currently IBS project is still based on traditional construction process which is isolation team working environment. Therefore this approach has been declared as a main barrier to ensure cooperative working relation in term of communication and information in between project stakeholders. Thus, this paper through literature review is attempted to present a discussion of the virtual team approach toward IBS project in developing effective team communication during construction project.
Code of Federal Regulations, 2012 CFR
2012-07-01
... of Congress. Flood control project: A project designed and constructed to have appreciable and... Washington, D.C. Hurricane/Shore Protection Project (HSPP). A flood control project designed and constructed... project, only those components that are necessary for the flood control function are considered eligible...
Code of Federal Regulations, 2013 CFR
2013-07-01
... of Congress. Flood control project: A project designed and constructed to have appreciable and... Washington, D.C. Hurricane/Shore Protection Project (HSPP). A flood control project designed and constructed... project, only those components that are necessary for the flood control function are considered eligible...
Code of Federal Regulations, 2011 CFR
2011-07-01
... of Congress. Flood control project: A project designed and constructed to have appreciable and... Washington, D.C. Hurricane/Shore Protection Project (HSPP). A flood control project designed and constructed... project, only those components that are necessary for the flood control function are considered eligible...
Code of Federal Regulations, 2010 CFR
2010-07-01
... of Congress. Flood control project: A project designed and constructed to have appreciable and... Washington, D.C. Hurricane/Shore Protection Project (HSPP). A flood control project designed and constructed... project, only those components that are necessary for the flood control function are considered eligible...
DOE Office of Scientific and Technical Information (OSTI.GOV)
LESKO KF; BERRIOCHOA MV
2010-02-26
Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business constructioin subcontractors while performing high hazard work in a safe and productive manner. Previous to the WRPS contract, construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installationmore » of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper descirbes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method (John E Schaufelberger, Len Holm, "Management of Construction Projects, A Constructor's Perspective", University of Washington, Prentice Hall 2002). This method was implemented in the first quarter of Fiscal Year 2009 (FY2009), where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by URS personnel. Each small contractor is mentored and supported utilizing the principles of the Construction Industry Institute (CII) Partnering process. Some of the key mentoring and partnering areas that are explored in this paper are, internal and external safety professional support, subcontractor safety teams and the interface with project and site safety teams, quality assurance program support to facilitate compliance with NQA-1, construction, team roles and responsibilities, work definition for successful fixed price contracts, scheduling and interface with project schedules and cost projection/accruals. The practical application of the CII Partnering principles, with the Construction Management expertise of URS, has led to a highly successful construction model that also meets small business contracting goals.« less
Construction Management--Exploding Some Myths.
ERIC Educational Resources Information Center
Kluenker, Charles
1986-01-01
Construction management on educational facility projects provides boards of education with documentation showing the project is on track. Eight "myths" surrounding construction management are explained. (MLF)
23 CFR 140.607 - Construction.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 23 Highways 1 2014-04-01 2014-04-01 false Construction. 140.607 Section 140.607 Highways FEDERAL... Bond Issue Projects § 140.607 Construction. Construction shall be supervised by the SHA in the same manner as for regularly financed Federal-aid projects. The FHWA will make construction inspections and...
23 CFR 140.607 - Construction.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 23 Highways 1 2011-04-01 2011-04-01 false Construction. 140.607 Section 140.607 Highways FEDERAL... Bond Issue Projects § 140.607 Construction. Construction shall be supervised by the SHA in the same manner as for regularly financed Federal-aid projects. The FHWA will make construction inspections and...
23 CFR 140.607 - Construction.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 23 Highways 1 2012-04-01 2012-04-01 false Construction. 140.607 Section 140.607 Highways FEDERAL... Bond Issue Projects § 140.607 Construction. Construction shall be supervised by the SHA in the same manner as for regularly financed Federal-aid projects. The FHWA will make construction inspections and...
23 CFR 140.607 - Construction.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 23 Highways 1 2010-04-01 2010-04-01 false Construction. 140.607 Section 140.607 Highways FEDERAL... Bond Issue Projects § 140.607 Construction. Construction shall be supervised by the SHA in the same manner as for regularly financed Federal-aid projects. The FHWA will make construction inspections and...
23 CFR 140.607 - Construction.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 23 Highways 1 2013-04-01 2013-04-01 false Construction. 140.607 Section 140.607 Highways FEDERAL... Bond Issue Projects § 140.607 Construction. Construction shall be supervised by the SHA in the same manner as for regularly financed Federal-aid projects. The FHWA will make construction inspections and...
NASA Astrophysics Data System (ADS)
Beliakov, Sergei
2018-03-01
Investment projects of high-rise construction have a number of features that determine specific risks and additional opportunities that require analysis and accounting in the formation of an effective project concept. The most significant features of high-rise construction include long construction time, complexity of technical and technological solutions, complexity of decisions on the organization of construction and operation, high cost of construction and operation, complexity in determining the ratio of areas designed to accommodate different functional areas, when organizing and coordinating the operation of the facility, with internal zoning. Taking into account the specificity of high-rise construction, among the factors determining the effectiveness of projects, it is advisable to consider as key factors: organizational, technological and investment factors. Within the framework of the article, the author singled out key particular functions for each group of factors under consideration, and also developed a system of principles for the formation of an effective concept of multifunctional high-rise construction investment projects, including the principle of logistic efficiency, the principle of optimal functional zoning, the principle of efficiency of equipment use, the principle of optimizing technological processes, the principle maximization of income, the principle of fund management, the principle of risk management . The model of formation of an effective concept of investment projects of multifunctional high-rise construction developed by the author can contribute to the development of methodological tools in the field of managing the implementation of high-rise construction projects, taking into account their specificity in the current economic conditions.
Financial auditing at enterprises for control of projects realized with credit fund-raising
NASA Astrophysics Data System (ADS)
Lukmanova, Inessa
2017-10-01
The article analyzes methods of conducting financial audit under the construction control of projects implemented with raising credit funds in modern conditions. This work aims to improve the methodological toolkit of construction control when lending projects of the construction of transport infrastructure. The paper considers correlations of various procedures of construction control, financial audit and organizational and technical factors affecting investment and construction projects. The authors presented the logical scheme of the process of lending to legal entities and developed an algorithm of the procedure for conducting a financial audit, allowing to make possible adjustments and the right decision.
18 CFR 4.96 - Amendment of exemption.
Code of Federal Regulations, 2010 CFR
2010-04-01
... design, location, method of construction or operation of its project, it must first notify the..., location, method of construction or operation of the project, the exemption holder may implement the..., method of construction or the operation of the project works, the exemption holder may not implement the...
Sanchez-Parcerisa, Daniel; Udías, Jose
2018-05-12
Open-source, MATLAB-based treatment planning systems FoCa and matRAD were used in a pilot project for training prospective medical physicists and postgraduate physics students in treatment planning and beam modeling techniques for proton therapy. In the four exercises designed, students learnt how proton pencil beams are modeled and how dose is calculated in three-dimensional voxelized geometries, how pencil beam scanning plans (PBS) are constructed, the rationale behind the choice of spot spacing in patient plans, and the dosimetric differences between photon IMRT and proton PBS plans. Sixty students of two courses participated in the pilot project, with over 90% of satisfactory rating from student surveys. The pilot experience will certainly be continued. © 2018 The Authors. Journal of Applied Clinical Medical Physics published by Wiley Periodicals, Inc. on behalf of American Association of Physicists in Medicine.
Libraries of life: using life history books with depressed care home residents.
Plastow, Nicola Ann
2006-01-01
Depression is a common, and often undetected, psychiatric disorder in geriatric care home residents. Reminiscence, an independent nursing therapy used by a variety of health and social care professionals, can prevent or reduce depression. This practice development project explored the use of reminiscence life history books as an interpersonal therapeutic tool with 3 depressed care-home residents living in residential care and skilled nursing facilities. The process of choosing to produce a book, assessment of capabilities, and methods of construction are described using 3 illustrative case studies. Three themes emerged: reviewing the past, accepting the present, and dreaming of an alternative future. This project demonstrated that life history books, tailored to individual needs and abilities, can facilitate reminiscence and reduce depression by increasing social interaction. The benefits to residents, their families, and care staff are discussed and the relevance to nursing practice highlighted.
Implementation of Building Information Modeling (BIM) in Construction: A Comparative Case Study
NASA Astrophysics Data System (ADS)
Rowlinson, Steve; Collins, Ronan; Tuuli, Martin M.; Jia, Yunyan
2010-05-01
Building Information Modeling (BIM) approach is increasingly adopted in coordination of construction projects, with a number of parties providing BIM services and software solutions. However, the empirical impact of BIM on construction industry has yet to be investigated. This paper explores the interaction between BIM and the construction industry during its implementation, with a specific focus on the empirical impacts of BIM on the design and construction processes and professional roles during the process. Two cases were selected from recent construction projects coordinated with BIM systems: the Venetian Casino project in Macau and the Cathy Pacific Cargo Terminal project in Hong Kong. The former case illustrates how the conflicts emerged during the design process and procurement were addressed by adopting a BIM approach. The latter demonstrates how the adoption of BIM altered the roles of architect, contractor, and sub-contractors involved in the project. The impacts of BIM were critically reviewed and discussed.
Generation of genetic constructs that simultaneously express several shRNAs.
Kretova, Olga V; Alembekov, Ildar R; Tchurikov, Nickolai A
2012-05-01
RNAi has potential as an antiviral gene therapy strategy. Cassette constructs simultaneously expressing several siRNAs could prove to be the most efficient technique in developing gene therapy approaches for highly mutable viruses such as HIV-1. Here we describe a rapid and cost-saving protocol to generate cassettes that simultaneously express three siRNAs for repression of HIV-1 and CCR5 transcripts. siRNA biological activity was tested in a non-viral system, and exhibited both efficiency and specificity. Our results suggest this protocol can be used to rapidly generate cassette constructs for antiviral gene therapy applications.
NASA Astrophysics Data System (ADS)
Chowdhury, Tamara
2013-08-01
Senior design courses are a core part of curricula across engineering and technology disciplines. Such courses offer Construction Management (CMG) students the opportunity to bring together, assimilate and apply the knowledge they have acquired over their entire undergraduate academic programme to an applied technical project. Senior or Capstone design course engages students in a real-world project, enhance leadership development, and prepare to manage and lead project teams. The CMG programme's multidisciplinary approach at Alabama A&M University, combines essential components of construction techniques with concepts of business management to develop technically qualified individuals for responsible management roles in the design, construction and operation of major construction projects. This paper analyses the performance of the students and improvement due to the interaction with the faculty advisors and industrial panel during the two semester Capstone project. The results of this Capstone sequence have shown a continuous improvement of student performance.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 42 Public Health 1 2013-10-01 2013-10-01 false May Self-Governance Tribes include IHS construction... OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Purpose and Scope § 137.275 May Self... agreement? Yes, Self-Governance Tribes may choose to assume construction programs in a construction project...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 1 2010-10-01 2010-10-01 false May Self-Governance Tribes include IHS construction... OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Purpose and Scope § 137.275 May Self... agreement? Yes, Self-Governance Tribes may choose to assume construction programs in a construction project...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 42 Public Health 1 2011-10-01 2011-10-01 false May Self-Governance Tribes include IHS construction... OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Purpose and Scope § 137.275 May Self... agreement? Yes, Self-Governance Tribes may choose to assume construction programs in a construction project...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 42 Public Health 1 2014-10-01 2014-10-01 false May Self-Governance Tribes include IHS construction... OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Purpose and Scope § 137.275 May Self... agreement? Yes, Self-Governance Tribes may choose to assume construction programs in a construction project...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 42 Public Health 1 2012-10-01 2012-10-01 false May Self-Governance Tribes include IHS construction... OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Purpose and Scope § 137.275 May Self... agreement? Yes, Self-Governance Tribes may choose to assume construction programs in a construction project...
Code of Federal Regulations, 2014 CFR
2014-10-01
..., the Self-Governance Tribe and the Secretary must agree upon and specify appropriate building codes and...-Governance Tribe in the preparation of its construction project proposal. If Tribal construction codes and standards (including national, regional, State, or Tribal building codes or construction industry standards...
Code of Federal Regulations, 2012 CFR
2012-10-01
..., the Self-Governance Tribe and the Secretary must agree upon and specify appropriate building codes and...-Governance Tribe in the preparation of its construction project proposal. If Tribal construction codes and standards (including national, regional, State, or Tribal building codes or construction industry standards...
Code of Federal Regulations, 2013 CFR
2013-10-01
..., the Self-Governance Tribe and the Secretary must agree upon and specify appropriate building codes and...-Governance Tribe in the preparation of its construction project proposal. If Tribal construction codes and standards (including national, regional, State, or Tribal building codes or construction industry standards...
Code of Federal Regulations, 2011 CFR
2011-10-01
..., the Self-Governance Tribe and the Secretary must agree upon and specify appropriate building codes and...-Governance Tribe in the preparation of its construction project proposal. If Tribal construction codes and standards (including national, regional, State, or Tribal building codes or construction industry standards...
Code of Federal Regulations, 2010 CFR
2010-10-01
..., the Self-Governance Tribe and the Secretary must agree upon and specify appropriate building codes and...-Governance Tribe in the preparation of its construction project proposal. If Tribal construction codes and standards (including national, regional, State, or Tribal building codes or construction industry standards...
Hu, Wenfa; He, Xinhua
2014-01-01
The time, quality, and cost are three important but contradictive objectives in a building construction project. It is a tough challenge for project managers to optimize them since they are different parameters. This paper presents a time-cost-quality optimization model that enables managers to optimize multiobjectives. The model is from the project breakdown structure method where task resources in a construction project are divided into a series of activities and further into construction labors, materials, equipment, and administration. The resources utilized in a construction activity would eventually determine its construction time, cost, and quality, and a complex time-cost-quality trade-off model is finally generated based on correlations between construction activities. A genetic algorithm tool is applied in the model to solve the comprehensive nonlinear time-cost-quality problems. Building of a three-storey house is an example to illustrate the implementation of the model, demonstrate its advantages in optimizing trade-off of construction time, cost, and quality, and help make a winning decision in construction practices. The computational time-cost-quality curves in visual graphics from the case study prove traditional cost-time assumptions reasonable and also prove this time-cost-quality trade-off model sophisticated.
Code of Federal Regulations, 2011 CFR
2011-10-01
...-Governance Tribes carry out construction projects without assuming these Federal environmental... 42 Public Health 1 2011-10-01 2011-10-01 false May Self-Governance Tribes carry out construction projects without assuming these Federal environmental responsibilities? 137.291 Section 137.291 Public...
18 CFR 4.104 - Amendment of exemption.
Code of Federal Regulations, 2010 CFR
2010-04-01
... change the design, location, method of construction or operation of its project, it must first notify the..., location, method of construction or operation of the project, the exemption holder may implement the..., method of construction or the operation of the project works, the exemption holder may not implement the...
Ranking the Project Management Success Factors for Construction Project in South India
NASA Astrophysics Data System (ADS)
Aneesha, K.; Haridharan, M. K.
2017-07-01
In Today’s construction industry, to achieve a greater advantage over the firms, success of each project and efficiency is required. Effective Project Management overcomes these types of challenges. This study identifies the success factors which are important for project management in construction project success. From the literature review, 26 factors were found to be critical. Project managers, construction managers, civil engineers, contractors and site engineers were the respondents. After analyzing the data in SPSS software, the dominant factors from the regression analysis are top management support, competent project team, abilities to solve problems, realistic cost and time estimates, information/communication, competency of the project manager are the 6 factors out of 12 in 26 factors. Effective communication between stakeholders got highest priority and client involvement, good leadership, clarity of project goals got second priority. Informal communication gives better results compared to formal communications like written formats. To remove communication barrier with the stakeholders, informal communication like speaking face-to-face with the language this fits for the stakeholders.
DOE Office of Scientific and Technical Information (OSTI.GOV)
LESO KF; HAMILTON HM; FARNER M
Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business construction subcontractors while performing high hazard work in a safe and productive manner. Previous to the Washington River Protection Solutions, LLC contract, Construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipmentmore » and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper describes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method. This method was implemented in the first quarter of Fiscal Year (FY) 2009, where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by DRS personnel. Each small contractor is mentored and supported utilizing the principles of the Construction Industry Institute (CII) Partnering process. Some of the key mentoring and partnering areas that are explored in this paper are, internal and external safety professional support, subcontractor safety teams and the interface with project and site safety teams, quality assurance program support to facilitate compliance with NQA-1, construction, team roles and responsibilities, work definition for successful fixed price contracts, scheduling and interface with project schedules and cost projection/accruals. The practical application of the CII Partnering principles, with the Construction Management expertise of URS, has led to a highly successful construction model that also meets small business contracting goals.« less
Rehabilitation Therapy Discipline Advisory Group Final Report. Kentucky Allied Health Project.
ERIC Educational Resources Information Center
Kentucky Council on Public Higher Education, Frankfort.
Rehabilitation therapy education in Kentucky and articulation within the fields of physical therapy and occupational therapy are examined, based on the Kentucky Allied Health Project (KAHP). The KAHP's model system of allied health education promotes articulation in learning, planning, and resource utilization, and seeks to meet the needs of…
NASA Astrophysics Data System (ADS)
Shi, Yu-Fang; Ma, Yi-Yi; Song, Ping-Ping
2018-03-01
System Reliability Theory is a research hotspot of management science and system engineering in recent years, and construction reliability is useful for quantitative evaluation of project management level. According to reliability theory and target system of engineering project management, the defination of construction reliability appears. Based on fuzzy mathematics theory and language operator, value space of construction reliability is divided into seven fuzzy subsets and correspondingly, seven membership function and fuzzy evaluation intervals are got with the operation of language operator, which provides the basis of corresponding method and parameter for the evaluation of construction reliability. This method is proved to be scientific and reasonable for construction condition and an useful attempt for theory and method research of engineering project system reliability.
Establishing a stem cell culture laboratory for clinical trials
Sekiya, Elíseo Joji; Forte, Andresa; Kühn, Telma Ingrid Borges de Bellis; Janz, Felipe; Bydlowski, Sérgio Paulo; Alves, Adelson
2012-01-01
Adult stem/progenitor cells are found in different human tissues. An in vitro cell culture is needed for their isolation or for their expansion when they are not available in a sufficient quantity to regenerate damaged organs and tissues. The level of complexity of these new technologies requires adequate facilities, qualified personnel with experience in cell culture techniques, assessment of quality and clear protocols for cell production. The rules for the implementation of cell therapy centers involve national and international standards of good manufacturing practices. However, such standards are not uniform, reflecting the diversity of technical and scientific development. Here standards from the United States, the European Union and Brazil are analyzed. Moreover, practical solutions encountered for the implementation of a cell therapy center appropriate for the preparation and supply of cultured cells for clinical studies are described. Development stages involved the planning and preparation of the project, the construction of the facility, standardization of laboratory procedures and development of systems to prevent cross contamination. Combining the theoretical knowledge of research centers involved in the study of cells with the practical experience of blood therapy services that manage structures for cell transplantation is presented as the best potential for synergy to meet the demands to implement cell therapy centers. PMID:23049427
Managing the construction bidding process : a move to simpler construction plan sets
DOT National Transportation Integrated Search
2001-01-31
This project was conducted to determine whether construction plan sets could be significantly simplified to speed the process of moving projects to construction. The work steps included a literature review, a telephone survey of highway agencies in s...
26 CFR 1.1039-1 - Certain sales of low-income housing projects.
Code of Federal Regulations, 2011 CFR
2011-04-01
... considered as the purchase or construction by A of such a project. (2) Special rules. (i) The cost of a... capital expenditures by the taxpayer that are attributable to acquisition, construction, or reconstruction..., 1970. If the taxpayer had begun construction of another qualified housing project on January 1, 1969...
26 CFR 1.1039-1 - Certain sales of low-income housing projects.
Code of Federal Regulations, 2012 CFR
2012-04-01
... considered as the purchase or construction by A of such a project. (2) Special rules. (i) The cost of a... capital expenditures by the taxpayer that are attributable to acquisition, construction, or reconstruction..., 1970. If the taxpayer had begun construction of another qualified housing project on January 1, 1969...
77 FR 25080 - Safety Zones; TriMet Bridge Project, Willamette River, Portland, OR
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-27
...-AA00 Safety Zones; TriMet Bridge Project, Willamette River, Portland, OR AGENCY: Coast Guard, DHS... trestles and construction cranes involved in the construction of the TriMet Bridge on the Willamette River... project. These safety zones replace the prior safety zones established for the TriMet Bridge construction...
Use of safety management practices for improving project performance.
Cheng, Eddie W L; Kelly, Stephen; Ryan, Neal
2015-01-01
Although site safety has long been a key research topic in the construction field, there is a lack of literature studying safety management practices (SMPs). The current research, therefore, aims to test the effect of SMPs on project performance. An empirical study was conducted in Hong Kong and the data collected were analysed with multiple regression analysis. Results suggest that 3 of the 15 SMPs, which were 'safety committee at project/site level', 'written safety policy', and 'safety training scheme' explained the variance in project performance significantly. Discussion about the impact of these three SMPs on construction was provided. Assuring safe construction should be an integral part of a construction project plan.
Concentrating Solar Power Projects - Hami 50 MW CSP Project | Concentrating
Solar Power | NREL Hami 50 MW CSP Project Status Date: April 6, 2018 Project Overview Project MW Status: Under construction Do you have more information, corrections, or comments? Background Technology: Power tower Status: Under construction Country: China City: Hami Region: Xinjiang Autonomous
Instantaneous Project Controls: Current Status, State of the Art, Benefits, and Strategies
ERIC Educational Resources Information Center
Abbaszadegan, Amin
2016-01-01
Despite advancements in construction and construction-related technology, capital project performance deviations, typically overruns, remain endemic within the capital projects industry. Currently, management is generally unaware of the current status of their projects, and thus monitoring and control of projects are not achieved effectively. In…
Constructability issues on KyTC projects.
DOT National Transportation Integrated Search
2003-07-01
A successful constructibility review process for a transportation agency must follow an established methodology similar to value engineering. The process must be flexible and address the critical issues impacting transportation construction projects,...
Keys, Yolanda; Silverman, Susan R; Evans, Jennie
2017-10-01
The purpose of this study was to collect the perceptions of design professionals and clinicians regarding design process success strategies and elements of interprofessional engagement and communication during healthcare design and construction projects. Additional objectives were to gather best practices to maximize clinician engagement and provide tools and techniques to improve interdisciplinary collaboration for future projects. Strategies are needed to enhance the design and construction process and create interactions that benefit not only the project but the individuals working to see its completion. Meaningful interprofessional collaboration is essential to any healthcare design project and making sure the various players communicate is a critical element. This was a qualitative study conducted via an online survey. Respondents included architects, construction managers, interior designers, and healthcare personnel who had recently been involved in a building renovation or new construction project for a healthcare facility. Responses to open-ended questions were analyzed for themes, and descriptive statistics were used to provide insight into participant demographics. Information on the impressions, perceptions, and opportunities related to clinician involvement in design projects was collected from nurses, architects, interior designers, and construction managers. Qualitative analysis revealed themes of clinician input, organizational dynamics, and a variety of communication strategies to be the most frequently mentioned elements of successful interprofessional collaboration. This study validates the need to include clinician input in the design process, to consider the importance of organizational dynamics on design team functioning, and to incorporate effective communication strategies during design and construction projects.
SCHOOL CONSTRUCTION SYSTEMS DEVELOPMENT PROJECT.
ERIC Educational Resources Information Center
BOICE, JOHN,; AND OTHERS
ONE-HUNDRED MANUFACTURERS EXPRESSED INTEREST IN BIDDING FOR A SYSTEM ON SCHOOL CONSTRUCTION CALLED SCSD OR SCHOOL CONSTRUCTION SYSTEMS DEVELOPMENT TO THE FIRST CALIFORNIA COMMISSION ON SCHOOL CONSTRUCTION SYSTEMS. TWENTY-TWO BUILDINGS COMPRISED THE PROJECT. THE OBJECTIVE WAS TO DEVELOP AN INTEGRATED SYSTEM OF STANDARD SCHOOL BUILDING COMPONENTS…
Algorithm for evaluating the effectiveness of a high-rise development project based on current yield
NASA Astrophysics Data System (ADS)
Soboleva, Elena
2018-03-01
The article is aimed at the issues of operational evaluation of development project efficiency in high-rise construction under the current economic conditions in Russia. The author touches the following issues: problems of implementing development projects, the influence of the operational evaluation quality of high-rise construction projects on general efficiency, assessing the influence of the project's external environment on the effectiveness of project activities under crisis conditions and the quality of project management. The article proposes the algorithm and the methodological approach to the quality management of the developer project efficiency based on operational evaluation of the current yield efficiency. The methodology for calculating the current efficiency of a development project for high-rise construction has been updated.
Identifying challenges in project consultants engagement practices
NASA Astrophysics Data System (ADS)
Shariffuddin, Nadia Alina Amir; Abidin, Nazirah Zainul
2017-10-01
Construction projects, green or conventional, involve multi-faceted disciplines engaged with the goal of delivering products i.e. building, infrastructure etc. at the best quality within stipulated budgets. For green projects, additional attention is added for environmental quality. Due to the various responsibilities and liabilities involved as well as the complexity of the construction process itself, formal engagement of multi-disciplinary professionals i.e. project consultants is required in any construction project. Poor selection of project consultants will lead to a multitude of complications resulting in delay, cost escalation, conflicts and poor quality. This paper explores the challenges that occur during the engagement of project consultants in a green project. As the engagement decision involves developers and architects, these two groups of respondents with green project backgrounds were approached qualitatively using interview technique. The challenges identified are limited experience and knowledge, consultants' fee vs. quality, green complexity, conflicts of interest, clients' extended expectation and less demand in green projects. The construction shifts to green project demands engagement of project consultants with added skills. It is expected that through the identification of challenges, better management and administration can be created which would give impact to the overall process of engagement in green projects.
The Legacy Project Intervention to Enhance Meaningful Family Interactions: Case Examples
ALLEN, REBECCA S.
2009-01-01
Manualized reminiscence and life review therapies are supported as an evidence-based, effective treatment for depression among older adults, but this therapeutic approach is usually individually administered and has rarely been applied in palliative care settings. We combined mutual reminiscence and life review with engagement in meaningful activity and examined the efficacy of this family-based dyadic intervention to decrease caregiving stress and increase family communication. Seventeen individuals living with chronic, life-limiting illnesses in the community and their family caregivers received three home visits with a master’s-level interventionist. During these sessions and through structured homework activities, the interventionist actively worked with the family to construct a personal Legacy Project, usually a scrapbook with photos, a cookbook, or audiotaped stories that celebrated the life of the ill individual. All participants in the intervention group initiated a Legacy Project and reported that Legacy activities improved family communication. Participation in Legacy creation also resulted in increased positive emotional experiences in patient and caregiver groups. These results are illustrated through careful examination of three case studies. PMID:20046967
2014-01-01
The time, quality, and cost are three important but contradictive objectives in a building construction project. It is a tough challenge for project managers to optimize them since they are different parameters. This paper presents a time-cost-quality optimization model that enables managers to optimize multiobjectives. The model is from the project breakdown structure method where task resources in a construction project are divided into a series of activities and further into construction labors, materials, equipment, and administration. The resources utilized in a construction activity would eventually determine its construction time, cost, and quality, and a complex time-cost-quality trade-off model is finally generated based on correlations between construction activities. A genetic algorithm tool is applied in the model to solve the comprehensive nonlinear time-cost-quality problems. Building of a three-storey house is an example to illustrate the implementation of the model, demonstrate its advantages in optimizing trade-off of construction time, cost, and quality, and help make a winning decision in construction practices. The computational time-cost-quality curves in visual graphics from the case study prove traditional cost-time assumptions reasonable and also prove this time-cost-quality trade-off model sophisticated. PMID:24672351
Social cost in construction projects
DOE Office of Scientific and Technical Information (OSTI.GOV)
Çelik, Tolga, E-mail: tolga.celik@emu.edu.tr; Kamali, Saeed, E-mail: saeedkamali2002@gmail.com; Arayici, Yusuf, E-mail: yusuf.arayici@hku.edu.tr
Despite the fact that completion of construction projects has a direct positive impact on the growth of national and local economies as well as humans' wellbeing, construction projects, especially in the urban areas, generate serious environmental nuisances for the adjacent residents and have unintentional adverse impacts on their surrounding environment. Construction causative adverse impacts on the neighbouring communities are known as the social costs. This study aims to present a state-of-the-art overview of social costs in construction industry in terms of definition, consideration, classification and quantification. Furthermore, it is aimed to bring the construction social cost phenomenon for the agendamore » of Environmental Impact Assessors.« less
Improving concrete overlay construction.
DOT National Transportation Integrated Search
2010-03-01
Several road construction projects involving concrete overlays at the state and county levels in Iowa in 2009 were studied for : construction techniques and methods. The projects that were evaluated consisted of sites in four Iowa counties: Osceola, ...
Risk Management in Construction Project: Taking Fairness into Account
NASA Astrophysics Data System (ADS)
Górecki, Jarosław; Bizon-Górecka, Jadwiga
2017-10-01
Risk management requires a comprehensive review of possible hazards, their possible outcomes as well as some recommendations about minimizing the risk. The study emphasises that the project risk management refers to an analysis of the risk factors and a creation of the strategy minimising negative effects of the risk. It was pointed out that a construction project is this kind of projects that can be defined as a unique process of high complexity (design documentation, various stages of creating the building), which has clearly defined time frames and a given financial limit. It is executed as a team work, by qualified or highly qualified specialists of different matters, for example masonry, precast, etc. Additionally, it requires a use of modern equipment and an adequate preparation of the investment. Therefore, the risk management focuses on the problems allowing for troubleshooting. A basis of the risk management is to recognise the fundamentals, which are crucial for the construction project management, i.e. an object perspective, including technological, supporting and management processes as well as an entity perspective - project stakeholders. Construction projects require also an acquaintance with the specificity of the branch. The article refers to the risk management in construction project and, in particular, a phenomenon of participants’ fairness in such projects. The problem of fairness of the entities involved in a project should be understood as a fair play, according to the arrangements agreed in a contract and compatible with current formal procedures and social rules. It was indicated that fairness can be treated as an important factor in predicting the success of such projects. Interviews conducted among contractors in Kuyavian-Pomeranian region showed varied fairness requirements put to individual participants of construction projects. The article presents results of the research. It shows a desired attitude of the surveyed enterprises towards a problem of the fair behaviour. These behaviours, relating to individual stakeholders, have been underlined in different phases of the construction projects’ life cycle.
Assessing the costs attributed to project delay during project pre-construction stages
DOT National Transportation Integrated Search
2016-03-01
This project for the Texas Department of Transportation (TxDOT) developed a simple but sound : methodology for estimating the cost of delaying most types of highway projects. Researchers considered the : cost of delays during the pre-construction pha...
Assessing the costs attributed to project delay during project pre-construction stages.
DOT National Transportation Integrated Search
2016-03-01
This project for the Texas Department of Transportation (TxDOT) developed a simple but sound : methodology for estimating the cost of delaying most types of highway projects. Researchers considered the : cost of delays during the pre-construction pha...
ERIC Educational Resources Information Center
Duncan, Verne A.
This handbook for construction project planning was developed to be used by the Oregon Department of Education to evaluate existing facilities and determine the projected needs for each of the community college districts. Each college district's eligibility for state participation in funding is based on a Basic Space Need (BSN) which is the square…
Code of Federal Regulations, 2010 CFR
2010-10-01
... the construction of a rural water supply project under this program? 404.12 Section 404.12 Public... RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.12 Can Reclamation provide assistance with the construction of a rural water supply project under this program? Reclamation may provide assistance with the...
ERIC Educational Resources Information Center
Goldblatt, Steven M.; Wood, R. Craig
Construction management is utilized when a school district engages a firm to coordinate a total project. The construction management seeks to save an owner time and cost primarily through better contractor coordination and project management. These services may include the planning and design phases of the project as well as the actual…
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 1 2010-10-01 2010-10-01 false What happens to funds remaining at the conclusion of a cost reimbursement construction project? 137.342 Section 137.342 Public Health PUBLIC HEALTH... remaining at the conclusion of a cost reimbursement construction project? All funds, including contingency...
NASA Astrophysics Data System (ADS)
Salah Alaloul, Wesam; Shahir Liew, Mohd; Zawawi, Noor Amila Wan
2017-12-01
The accomplishment of construction projects is extremely dependent on the integration of several stakeholders; therefore none of them has the control or the ability to accomplish the project alone. Each of them may influence and be influenced by the project management approach. There is no comprehensive theoretical platform for defining Communication, Coordination and Cooperation (3Cs) in the management of construction project. This paper deliberates the function of the 3Cs different theoretical perceptions. Through an analysis of selected articles from reputable academic journals in construction management, the business environment and human behaviour were identified as two main parts. A little has been done so far about the 3Cs, and how they are correlated with construction projects performance. Therefore, the objective of this paper is to explain the definitions and the association between the 3Cs. There is a significant link between communication and coordination. Coordination alternatively, is trust-based a logic of mutual and exchange. Consequently, cooperation is much more sophisticated, which needing more time and attempts.
The influence of client brief and change order in construction project
NASA Astrophysics Data System (ADS)
Mahat, N. A. A.; Adnan, H.
2018-02-01
Construction briefing is a statement of needs about intentions and projects objectives. Briefing process is the preliminary stage in the design process and successful briefing can achieve project delivery right on target time, cost and quality of project confidently. Although there are many efforts to approach client’s requirement and needs for a project, it is still not collected adequately to make proper solutions in design. Thus, these may lead the client to include change orders during the construction phase. This paper is concerned toward the influence of client’s briefing of a construction project that impact on the change order on the construction works. The research objective is to identify the influence of client’s brief on change orders, therefore, the aims of the research is to reduce change orders in project delivery. This research adopted both qualitative and quantitative data collection methods which are content analysis and semi structure interview. The findings highlight factors contributing to change orders and the essential attributes of clients during the briefing stage that may help minimise them.
Additive Construction with Mobile Emplacement (ACME)
NASA Technical Reports Server (NTRS)
Vickers, John
2015-01-01
The Additive Construction with Mobile Emplacement (ACME) project is developing technology to build structures on planetary surfaces using in-situ resources. The project focuses on the construction of both 2D (landing pads, roads, and structure foundations) and 3D (habitats, garages, radiation shelters, and other structures) infrastructure needs for planetary surface missions. The ACME project seeks to raise the Technology Readiness Level (TRL) of two components needed for planetary surface habitation and exploration: 3D additive construction (e.g., contour crafting), and excavation and handling technologies (to effectively and continuously produce in-situ feedstock). Additionally, the ACME project supports the research and development of new materials for planetary surface construction, with the goal of reducing the amount of material to be launched from Earth.
Aminbakhsh, Saman; Gunduz, Murat; Sonmez, Rifat
2013-09-01
The inherent and unique risks on construction projects quite often present key challenges to contractors. Health and safety risks are among the most significant risks in construction projects since the construction industry is characterized by a relatively high injury and death rate compared to other industries. In construction project management, safety risk assessment is an important step toward identifying potential hazards and evaluating the risks associated with the hazards. Adequate prioritization of safety risks during risk assessment is crucial for planning, budgeting, and management of safety related risks. In this paper, a safety risk assessment framework is presented based on the theory of cost of safety (COS) model and the analytic hierarchy process (AHP). The main contribution of the proposed framework is that it presents a robust method for prioritization of safety risks in construction projects to create a rational budget and to set realistic goals without compromising safety. The framework provides a decision tool for the decision makers to determine the adequate accident/injury prevention investments while considering the funding limits. The proposed safety risk framework is illustrated using a real-life construction project and the advantages and limitations of the framework are discussed. Copyright © 2013 National Safety Council and Elsevier Ltd. All rights reserved.
Hiilangaay Hydroelectric Project – Final Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Twitchell, Sara; Stimac, Michael; Lang, Lisa
2016-06-01
The Hiilangaay Hydroelectric Project (“Hiilangaay” or the “Project”) is a 5-megawatt hydroelectric resource currently under construction on Prince of Wales Island (POW), Alaska, approximately ten miles east of Hydaburg. The objective of the Project is to interconnect with the existing transmission grid on Prince of Wales Island, increasing the hydroelectric generation capability by 5 MW, eliminating the need for diesel generation, increasing the reliability of the electrical system, and allowing the interconnected portion of the island to have 100 percent renewable energy generation. Pre-construction activities including construction planning, permit coordination and compliance, and final design have made it possible tomore » move forward with construction of the Hiilangaay Project. Despite repeated delays to the schedule, persistence and long-term planning will culminate in the construction of the Project, and make Prince of Wales Island independent of diesel-fueled energy« less
Risk Analysis of Underestimate Cost Offer to The Project Quality in Aceh Province
NASA Astrophysics Data System (ADS)
Rani, Hafnidar A.
2016-11-01
The possibility of errors in the process of offer price determination could be enormous, so it can affect the possibility of project underestimate cost which can impact and reduce the profit if being implementing. Government Equipment/Service Procurement Policy Institution (LKPP) assesses that the practices of cheaper price in the government equipment/service procurement are still highly found and can be potential to decrease the project quality. This study aimed to analyze the most dominant factors happened in underestimate cost offer practice, to analyze the relationship of underestimate cost offer risk factors to road construction project quality in Aceh Province and to analyze the most potential factors of underestimate cost offer risk affecting road construction project quality in Aceh Province. Road construction projects observed the projects which have been implemented in Aceh Province since 2013 - 2015. This study conducted by interviewing Government Budget Authority (KPA), and distributing the questionnaire to the road construction contractors with the qualification of K1, K2, K3, M1, M2 and B1. Based on the data from Construction Service Development Institution (LPJK) of Aceh Province on 2016, the populations obtained are 2,717 constructors. By using Slovin Equation, the research samples obtained are 97 contractors. The most dominant factors in underestimate cost offer risk of the road construction projects in Aceh Province is Contingency Cost Factor which the mean is 4.374.
Agricultural Construction Volume I. Arc Welding Project Construction. Instructor's Guide.
ERIC Educational Resources Information Center
Brzozowski, Dick; Admire, Myron
This guide contains instructor's materials for teaching a secondary agricultural construction course consisting of instructional units on arc welding (8 lessons) and project construction (14 lessons). The materials for each unit include student objectives, a list of competencies from which the objectives were derived, suggestions for motivating…
Evaluation of construction strategies for PCC pavement rehabilitation projects.
DOT National Transportation Integrated Search
2010-09-30
This study investigated project management level solutions to optimizing resources, minimizing costs : (including user costs) and time for PCC pavement rehabilitation projects. This study extensively : evaluated the applicability of the Construction ...
NASA Astrophysics Data System (ADS)
Radziszewska-Zielina, E.; Szewczyk, B.
2017-10-01
The aim of the article is to present examples of actions that can be undertaken in order to improve partnering cooperation in construction projects. These actions are a practical supplementation to the previously developed fuzzy system of controlling partnering relations in construction projects. The actions relate to 18 parameters of partnering relations that describe cooperation between a general contractor or a company that manages the project and four other participants: the contractors (subcontractors), the designer, the material and equipment suppliers and the real estate developer. The actions have been listed based on a review of subject literature, self-analysis, as well as interviews with participants of construction projects. They can provide examples of good practices that maintain partnering cooperation at a high level. Good cooperation, in turn, translates into a better performance of the project.
Lopes, Manoela Gomes Reis; Vilela, Rodolfo Andrade de Gouveia; Querol, Marco Antônio Pereira
2018-02-19
Large construction projects involve the functioning of a complex activity system (AS) in network format. Anomalies such as accidents, delays, reworks, etc., can be explained by contradictions that emerge historically in the system. The aim of this study was to analyze the history of an airport construction project to understand the current contradictions and anomalies in the AS and how they emerged. A case study was conducted for this purpose, combining Collective Work Analysis, interviews, observations, and analysis of documents that provided the basis for sessions in the Change Laboratory, where a participant timeline was elaborated with the principal events during the construction project. Based on the timeline, a historical analysis of the airport's AS revealed critical historical events and contradictions that explained the anomalies that occurred during the project. The analysis showed that the airport had been planned for construction with politically determined deadlines that were insufficient and inconsistent with the project's complexity. The choice of the contract modality, which assigned responsibility to a joint venture for all of the project's phases, was another critical historical event, because it allowed launching the construction before a definitive executive project had been drafted. There were also different cultures in companies working together for the first time in the context of a project with time pressures and outsourcing of activities without the necessary coordination. Identifying these contradictions and their historical origins proved essential for understanding the current situation and efforts to prevent similar situations in the future.
Occupational Therapy in Medicaid Home and Community-Based Services Waivers.
Friedman, Carli; VanPuymbrouck, Laura
Medicaid Home and Community-Based Services (HCBS) 1915(c) waivers are the largest provider of long-term services and supports for people with intellectual and developmental disabilities (IDDs). In this study, we explored how HCBS IDD waivers projected providing occupational therapy services in Fiscal Year (FY) 2015. Medicaid HCBS IDD waivers across the nation gathered from the Centers for Medicare and Medicaid Services were qualitatively and quantitatively analyzed to determine how they projected providing occupational therapy services in terms of service expenditures and utilization. In FY 2015, $14.13 million of spending was projected for occupational therapy services of 7,500 participants. However, there was large heterogeneity across states and services in terms of total projected spending, spending per participant, and reimbursement rates. Comparisons across states strengthen the profession's ability to assert the value of its services. These findings can help identify best practices and can advocate for the refinement of state occupational therapy programs. Copyright © 2018 by the American Occupational Therapy Association, Inc.
ERIC Educational Resources Information Center
Lambert, Simone F.; LeBlanc, Michael; Mullen, Jodi Ann; Ray, Dee; Baggerly, Jennifer; White, JoAnna; Kaplan, David
2007-01-01
Through a joint research committee sponsored by the Association for Play Therapy (APT) and the American Counseling Association (ACA), The National Play Therapy in Counseling Practices Project conducted the first phase of investigation. Findings offered a snapshot of mental health providers of play therapy, regarding the nature of who they are and…
The S-curve for forecasting waste generation in construction projects.
Lu, Weisheng; Peng, Yi; Chen, Xi; Skitmore, Martin; Zhang, Xiaoling
2016-10-01
Forecasting construction waste generation is the yardstick of any effort by policy-makers, researchers, practitioners and the like to manage construction and demolition (C&D) waste. This paper develops and tests an S-curve model to indicate accumulative waste generation as a project progresses. Using 37,148 disposal records generated from 138 building projects in Hong Kong in four consecutive years from January 2011 to June 2015, a wide range of potential S-curve models are examined, and as a result, the formula that best fits the historical data set is found. The S-curve model is then further linked to project characteristics using artificial neural networks (ANNs) so that it can be used to forecast waste generation in future construction projects. It was found that, among the S-curve models, cumulative logistic distribution is the best formula to fit the historical data. Meanwhile, contract sum, location, public-private nature, and duration can be used to forecast construction waste generation. The study provides contractors with not only an S-curve model to forecast overall waste generation before a project commences, but also with a detailed baseline to benchmark and manage waste during the course of construction. The major contribution of this paper is to the body of knowledge in the field of construction waste generation forecasting. By examining it with an S-curve model, the study elevates construction waste management to a level equivalent to project cost management where the model has already been readily accepted as a standard tool. Copyright © 2016 Elsevier Ltd. All rights reserved.
Elizabeth Usher Memorial Lecture: Placing therapy in the context of the self and social connection.
Douglas, Jacinta
2015-06-01
The concept of self influences the choice of goals and helps to make sense of lives. Essentially, self-concept is a dynamic internal representation of the individual. This representation shapes behaviour and how information about oneself is processed. The self-story is developed and validated through social interactions and shaped continuously through life experiences. The focus of this paper is the client's perspective of self and how one can actively use that perspective to plan therapy, particularly in the case of individuals with acquired brain injury (ABI). The paper draws upon the results of a number of research projects constructed around two primary aims: (1) to represent the perspectives of clients and their close others and (2) to maximize social connection through the delivery of effective communication intervention. A model of self, derived from in-depth qualitative exploration of the experiences of people with ABI, is presented as a framework to guide collaborative therapy. The model depicts the multidimensional and cyclical nature of self- conceptualization supported by factors that facilitate social connection. Communication is crucial to maintaining social ties and communication breakdown is a significant predictor of participation. A new intervention that effectively improves coping with communication breakdown is presented.
Novel Therapy for Bone Regeneration in Large Segmental Defects
2017-12-01
healing. Clin Orthop Relat Res. 1998;355(Suppl):S230–8. 37. Pape HC, Giannoudis PV. Fat embolism and IM nailing. Injury. 2006;37(Suppl 4):S1–2. 38. Wenda...mechanisms to elicit bone healing. 15. SUBJECT TERMS Bone healing, bone morphogenetic protein (BMP), thrombopoietin (TPO), therapy, fracture healing...thrombopoietin (TPO), therapy, fracture healing, bone regeneration, minipig, pig 3. OVERALL PROJECT SUMMARY: Project start date 30/09/2013 Project end
25 CFR 170.202 - Does the Relative Need Distribution Factor allocate funding among tribes?
Code of Federal Regulations, 2012 CFR
2012-04-01
... self-governance tribes that negotiate IRR construction projects into their AFA, and distributed to BIA... a construction project, the project must be included in an FHWA-approved Transportation Improvement...
25 CFR 170.202 - Does the Relative Need Distribution Factor allocate funding among tribes?
Code of Federal Regulations, 2013 CFR
2013-04-01
... self-governance tribes that negotiate IRR construction projects into their AFA, and distributed to BIA... a construction project, the project must be included in an FHWA-approved Transportation Improvement...
25 CFR 170.202 - Does the Relative Need Distribution Factor allocate funding among tribes?
Code of Federal Regulations, 2014 CFR
2014-04-01
... self-governance tribes that negotiate IRR construction projects into their AFA, and distributed to BIA... a construction project, the project must be included in an FHWA-approved Transportation Improvement...
25 CFR 170.202 - Does the Relative Need Distribution Factor allocate funding among tribes?
Code of Federal Regulations, 2011 CFR
2011-04-01
... self-governance tribes that negotiate IRR construction projects into their AFA, and distributed to BIA... a construction project, the project must be included in an FHWA-approved Transportation Improvement...
25 CFR 170.202 - Does the Relative Need Distribution Factor allocate funding among tribes?
Code of Federal Regulations, 2010 CFR
2010-04-01
... self-governance tribes that negotiate IRR construction projects into their AFA, and distributed to BIA... a construction project, the project must be included in an FHWA-approved Transportation Improvement...
A review of risk management process in construction projects of developing countries
NASA Astrophysics Data System (ADS)
Bahamid, R. A.; Doh, S. I.
2017-11-01
In the construction industry, risk management concept is a less popular technique. There are three main stages in the systematic approach to risk management in construction industry. These stages include: a) risk response; b) risk analysis and evaluation; and c) risk identification. The high risk related to construction business affects each of its participants; while operational analysis and management of construction related risks remain an enormous task to practitioners of the industry. This paper tends towards reviewing the existing literature on construction project risk managements in developing countries specifically on risk management process. The literature lacks ample risk management process approach capable of capturing risk impact on diverse project objectives. This literature review aims at discovering the frequently used techniques in risk identification and analysis. It also attempts to identify response to clarifying the different classifications of risk sources in the existing literature of developing countries, and to identify the future research directions on project risks in the area of construction in developing countries.
Case Study on Project Risk Management Planning Based on Soft System Methodology
NASA Astrophysics Data System (ADS)
Lifang, Xie; Jun, Li
This paper analyzed the soft system characters of construction projects and the applicability on using Soft System Methodology (SSM) for risk analysis after a brief review of SSM. Taking a hydropower project as an example, it constructed the general frame of project risk management planning (PRMP) and established the Risk Management Planning (RMP) system from the perspective of the interests of co-ordination. This paper provided the ideas and methods for construction RMP under the win-win situation through the practice of SSM.
NASA Astrophysics Data System (ADS)
Zaychenko, Irina; Borremans, Alexandra; Gutman, Svetlana
2018-03-01
The article describes the concept and types of administrative barriers encountered in various areas of the enterprise. The particularities of the Russian high-rise construction industry are described and a comparative analysis of administrative barriers in this sector is performed. The main stages and administrative procedures when the developers implement investment and construction projects in the field of high-rise construction are determined. The regulatory and legal framework for the implementation of investment and project activities in the high-rise construction industry has been studied and conclusions have been drawn on its low level of precision in the issue of the formation of competitive and efficient high-rise construction markets. The average number of administrative procedures for the implementation of the investment and construction project in the field of high-rise construction is determined. The factors preventing the reduction of administrative barriers in the high-rise construction industry are revealed.
How Can Lean Construction Improve the Daily Schedule of A Construction Manager?
NASA Astrophysics Data System (ADS)
Binninger, Marco; Dlouhy, Janosch; Schneider, Johannes; Haghsheno, Shervin
2017-10-01
The outcome of construction projects highly depends on effective management. The site manager is responsible for the site, and has a key role in executing construction projects. Especially this position has a wide range of tasks and a high volume of workload, which has to be carried out in a high pressure and high stress environment. Chaotic construction processes often create these working conditions. Lean Construction can help to organize the construction site in a better way and automatically supports the site manager.
ERIC Educational Resources Information Center
Graham, Charles W.; Geva, Anat
2001-01-01
An interdisciplinary studio project involved architecture and construction students. Evaluation of the integrated studio experience found that it gave students an accurate picture of professional practice. Architecture students were made more aware of building materials, construction technology, and cost; construction science students better…
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 1 2010-10-01 2010-10-01 false May Self-Governance Tribes carry out construction... OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Nepa Process § 137.291 May Self-Governance Tribes carry out construction projects without assuming these Federal environmental...
77 FR 42696 - Submission for OMB Review; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-20
... construction awards, 30 requests for amendments to non-construction awards, 2 project service maps). Average Hours Per Response: 2 hours for an amendment to a construction award, 1 hour for an amendment to a non-construction award, 6 hours for a project service map. Burden Hours: 1,242. Needs and Uses: A recipient must...
24 CFR 92.206 - Eligible project costs.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 24 Housing and Urban Development 1 2014-04-01 2014-04-01 false Eligible project costs. 92.206....206 Eligible project costs. HOME funds may be used to pay the following eligible costs: (a... following: (1) For new construction projects, costs to meet the new construction standards in § 92.251; (2...
ERIC Educational Resources Information Center
Department of Health , Education, and Welfare, Washington., DC. Office of the Secretary.
This handbook provides a basis for consideration of acceptable approaches which are available and may be used to initiate the use of construction management services in the planning, design, and construction of federally assisted construction projects. It includes the mandatory federal requirements as well as acceptable procedures for selecting…
Code of Federal Regulations, 2013 CFR
2013-10-01
... customarily be capitalized as Vessel or Shipyard Project construction costs such as designing, engineering...) Cost items include those items usually specified in Vessel or Shipyard Project construction contracts... fees and interest on the Obligations or other borrowings incurred during the construction period...
Code of Federal Regulations, 2012 CFR
2012-10-01
... customarily be capitalized as Vessel or Shipyard Project construction costs such as designing, engineering...) Cost items include those items usually specified in Vessel or Shipyard Project construction contracts... fees and interest on the Obligations or other borrowings incurred during the construction period...
Code of Federal Regulations, 2014 CFR
2014-10-01
... customarily be capitalized as Vessel or Shipyard Project construction costs such as designing, engineering...) Cost items include those items usually specified in Vessel or Shipyard Project construction contracts... fees and interest on the Obligations or other borrowings incurred during the construction period...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rucinski, A; Mancini-Terracciano, C; Paramatti, R
2016-06-15
Purpose: Development of strategies to monitor range uncertainties is necessary to improve treatment planning in Charged Particle Therapy (CPT) and fully exploit the advantages of ion beams. Our group developed (within the framework of the INSIDE project funded by the Italian research ministry) and is currently building a compact detector Dose Profiler (DP) able to backtrack charged secondary particles produced in the patient during the irradiation. Furthermore we are studying monitoring strategy exploiting charged secondary emission profiles to control the range of the ion beam. Methods: This contribution reports on the DP detector design and construction status. The detector consistsmore » of a charged secondary tracker composed of scintillating fiber layers and a LYSO calorimeter for particles energy measurement.The detector layout has been optimized using the FLUKA Monte Carlo (MC) simulation software. The simulation of a 220 MeV Carbon beam impinging on a PMMA target has been performed to study the detector response, exploiting previous secondary radiation measurements performed by our group. The emission profile of charged secondary particles was reconstructed backtracking the particles to their generation point to benchmark the DP performances. Results: The DP construction status, including the technological details will be presented. The feasibility of range monitoring with DP will be demonstrated by means of MC studies. The correlation of the charged secondary particles emission shape with the position of the Bragg peak (BP) will be shown, as well as the spatial resolution achievable on the BP position estimation (less than 3 mm) in the clinical like conditions. Conclusion: The simulation studies supported the feasibility of an accurate range monitoring technique exploiting the use of charged secondary fragments emitted during the particle therapy treatment. The DP experimental tests are foreseen in 2016, at CNAO particle therapy center in Pavia.« less
Streamlined project closeout for construction at KYTC.
DOT National Transportation Integrated Search
2017-09-01
Project closeout is the period between the end of construction and when a contract is finalized. During closeout, resources are held in encumbered funds intended for the project and in the contractors bonding capacity. Although the Kentucky Transp...
24 CFR 884.122 - Separate project requirement.
Code of Federal Regulations, 2010 CFR
2010-04-01
... separate ACC List and ACC Part I and shall be assigned a separate project number. All new construction... construction projects where: (1) The units are placed under ACC on the same date; and (2) Such consolidation is...
24 CFR 884.122 - Separate project requirement.
Code of Federal Regulations, 2011 CFR
2011-04-01
... separate ACC List and ACC Part I and shall be assigned a separate project number. All new construction... construction projects where: (1) The units are placed under ACC on the same date; and (2) Such consolidation is...
The Effects of Personal Construct Group Therapy on Breast Cancer Survivors
ERIC Educational Resources Information Center
Lane, Lisbeth G.; Viney, Linda L.
2005-01-01
In this study, the authors evaluated the effects of a brief personal construct group therapy on breast cancer survivors (N = 42) randomly assigned to either the treatment or wait-list control condition. The Gottschalk Gleser Content Analysis Scales were used to measure the effects for group across time (preand posttreatment, pretreatment, and…
Resisting Anorexia/Bulimia: Foucauldian Perspectives in Narrative Therapy
ERIC Educational Resources Information Center
Lock, Andrew; Epston, David; Maisel, Richard; de Faria, Natasha
2005-01-01
Foucault's analysis of unseen power as it operates in discourses that construct "practices of discipline" and "technologies of the self" has been a central conceptual resource in the development of narrative therapy. Narrative therapists take the view that ?unseen aspects of power work to construct both how a person understands their situation,…
Mount, David L; Feeney, Patricia; Fabricatore, Anthony N; Coday, Mace; Bahnson, Judy; Byington, Robert; Phelan, Suzanne; Wilmoth, Sharon; Knowler, William C; Hramiak, Irene; Osei, Kwame; Sweeney, Mary Ellen; Espeland, Mark A
2009-10-01
Comparing findings from separate trials is necessary to choose among treatment options, however differences among study cohorts may impede these comparisons. As a case study, to examine the overlap of study cohorts in two large randomized controlled clinical trials that assess interventions to reduce risk of major cardiovascular disease events in adults with type 2 diabetes in order to explore the feasibility of cross-trial comparisons The Action for Health in Diabetes (Look AHEAD) and The Action to Control Cardiovascular Risk in Diabetes (ACCORD) trials enrolled 5145 and 10,251 adults with type 2 diabetes, respectively. Look AHEAD assesses the efficacy of an intensive lifestyle intervention designed to produce weight loss; ACCORD tests pharmacological therapies for control of glycemia, hyperlipidemia, and hypertension. Incidence of major cardiovascular disease events is the primary outcome for both trials. A sample was constructed to include participants from each trial who appeared to meet eligibility criteria and be appropriate candidates for the other trial's interventions. Demographic characteristics, health status, and outcomes of members and nonmembers of this constructed sample were compared. Nearly 80% of Look AHEAD participants were projected to be ineligible for ACCORD; ineligibility was primarily due to better glycemic control or no early history of cardiovascular disease. Approximately 30% of ACCORD participants were projected to be ineligible for Look AHEAD, often for reasons linked to poorer health. The characteristics of participants projected to be jointly eligible for both trials continued to reflect differences between trials according to factors likely linked to retention, adherence, and study outcomes. Accurate ascertainment of cross-trial eligibility was hampered by differences between protocols. Despite several similarities, the Look AHEAD and ACCORD cohorts represent distinct populations. Even within the subsets of participants who appear to be eligible and appropriate candidates for trials of both modes of intervention, differences remained. Direct comparisons of results from separate trials of lifestyle and pharmacologic interventions are compromised by marked differences in enrolled cohorts.
2016-09-01
unneeded to support U.S. forces in the CENTCOM area of responsibility and in future contingencies worldwide. View GAO-16-406. For more information...DEFENSE INFRASTRUCTURE Actions Needed to Enhance Oversight of Construction Projects Supporting Military Contingency ...Actions Needed to Enhance Oversight of Construction Projects Supporting Military Contingency Operations Why GAO Did This Study For about 15 years, DOD
Code of Federal Regulations, 2012 CFR
2012-10-01
... 42 Public Health 1 2012-10-01 2012-10-01 false Is a Self-Governance Tribe required to submit construction project progress and financial reports for construction project agreements? 137.351 Section 137.351 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 42 Public Health 1 2014-10-01 2014-10-01 false Is a Self-Governance Tribe required to submit construction project progress and financial reports for construction project agreements? 137.351 Section 137.351 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 1 2010-10-01 2010-10-01 false Is a Self-Governance Tribe required to submit construction project progress and financial reports for construction project agreements? 137.351 Section 137.351 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES...
Informal worker phenomenon in housing construction project
NASA Astrophysics Data System (ADS)
Wijayaningtyas, Maranatha; Sipan, Ibrahim; Lukiyanto, Kukuh
2017-11-01
The informal workers phenomenon on housing construction projects in Indonesia is different from workers in other sectors who would always request as permanent employees. Substantively, the informal workers are disinclined to be bound as permanent employees which different from the general labor paradigm. Hence, the objective of this study is to find out how the labour selection process, the factors that affected their performance, and the suitable wage system to achieve the target completion of housing construction project. The qualitative method is used to uncover and understand the meaning behind the phenomena (numina) of informal workers action and their influence on housing construction project which called phenomenological approach. Five informal workers and two project managers were selected as informants based on predetermined criteria with in-depth interviews. The results showed that the informal worker were more satisfied with the wage based on unit price while working in the housing construction project for the flexibility in working hours. In addition, the developer was also relieved because they only control the quality and the achievement of the project completion time which supported by informal worker leader. Therefore, these findings are beneficial for both of developer and government as policy maker to succeed the housing program in Indonesia.
The application of micro UAV in construction project
NASA Astrophysics Data System (ADS)
Kaamin, Masiri; Razali, Siti Nooraiin Mohd; Ahmad, Nor Farah Atiqah; Bukari, Saifullizan Mohd; Ngadiman, Norhayati; Kadir, Aslila Abd; Hamid, Nor Baizura
2017-10-01
In every outstanding construction project, there is definitely have an effective construction management. Construction management allows a construction project to be implemented according to plan. Every construction project must have a progress development works that is usually created by the site engineer. Documenting the progress of works is one of the requirements in construction management. In a progress report it is necessarily have a visual image as an evidence. The conventional method used for photographing on the construction site is by using common digital camera which is has few setback comparing to Micro Unmanned Aerial Vehicles (UAV). Besides, site engineer always have a current issues involving limitation of monitoring on high reach point and entire view of the construction site. The purpose of this paper is to provide a concise review of Micro UAV technology in monitoring the progress on construction site through visualization approach. The aims of this study are to replace the conventional method of photographing on construction site using Micro UAV which can portray the whole view of the building, especially on high reach point and allows to produce better images, videos and 3D model and also facilitating site engineer to monitor works in progress. The Micro UAV was flown around the building construction according to the Ground Control Points (GCPs) to capture images and record videos. The images taken from Micro UAV have been processed generate 3D model and were analysed to visualize the building construction as well as monitoring the construction progress work and provides immediate reliable data for project estimation. It has been proven that by using Micro UAV, a better images and videos can give a better overview of the construction site and monitor any defects on high reach point building structures. Not to be forgotten, with Micro UAV the construction site progress is more efficiently tracked and kept on the schedule.
Xu, Jiuping; Feng, Cuiying
2014-01-01
This paper presents an extension of the multimode resource-constrained project scheduling problem for a large scale construction project where multiple parallel projects and a fuzzy random environment are considered. By taking into account the most typical goals in project management, a cost/weighted makespan/quality trade-off optimization model is constructed. To deal with the uncertainties, a hybrid crisp approach is used to transform the fuzzy random parameters into fuzzy variables that are subsequently defuzzified using an expected value operator with an optimistic-pessimistic index. Then a combinatorial-priority-based hybrid particle swarm optimization algorithm is developed to solve the proposed model, where the combinatorial particle swarm optimization and priority-based particle swarm optimization are designed to assign modes to activities and to schedule activities, respectively. Finally, the results and analysis of a practical example at a large scale hydropower construction project are presented to demonstrate the practicality and efficiency of the proposed model and optimization method.
Time Overrun in Construction Project
NASA Astrophysics Data System (ADS)
Othman, I.; Shafiq, Nasir; Nuruddin, M. F.
2017-12-01
Timely completion is the key criteria to achieve success in any project despite the industry. Unfortunately construction industry in Malaysia has been labelled as industry facing poor performance leading to failure in achieving effective time management. As the consequence most of the project face huge amount of time overrun. This study assesses the causes of construction projects time overrun in Malaysia using structured questionnaire survey. Each respondent is asked to assign a one-to-five rating for each of the 18 time factors identified from literature review. Out of the 50 questionnaires sent out, 33 were received back representing 68% of the response rate. Data received from the questionnaires were analysed and processed using the descriptive statistics procedures. Findings from the study revealed that design and documentation issues, project management and contract administration, ineffective project planning and scheduling, contractor’s site management, financial resource management were the major factors that cause the time overrun. This study is hoped to help the practitioners to implement the mitigation measure at planning stage in order to achieve successful construction projects.
Xu, Jiuping
2014-01-01
This paper presents an extension of the multimode resource-constrained project scheduling problem for a large scale construction project where multiple parallel projects and a fuzzy random environment are considered. By taking into account the most typical goals in project management, a cost/weighted makespan/quality trade-off optimization model is constructed. To deal with the uncertainties, a hybrid crisp approach is used to transform the fuzzy random parameters into fuzzy variables that are subsequently defuzzified using an expected value operator with an optimistic-pessimistic index. Then a combinatorial-priority-based hybrid particle swarm optimization algorithm is developed to solve the proposed model, where the combinatorial particle swarm optimization and priority-based particle swarm optimization are designed to assign modes to activities and to schedule activities, respectively. Finally, the results and analysis of a practical example at a large scale hydropower construction project are presented to demonstrate the practicality and efficiency of the proposed model and optimization method. PMID:24550708
He, Y J; Li, X T; Fan, Z Q; Li, Y L; Cao, K; Sun, Y S; Ouyang, T
2018-01-23
Objective: To construct a dynamic enhanced MR based predictive model for early assessing pathological complete response (pCR) to neoadjuvant therapy in breast cancer, and to evaluate the clinical benefit of the model by using decision curve. Methods: From December 2005 to December 2007, 170 patients with breast cancer treated with neoadjuvant therapy were identified and their MR images before neoadjuvant therapy and at the end of the first cycle of neoadjuvant therapy were collected. Logistic regression model was used to detect independent factors for predicting pCR and construct the predictive model accordingly, then receiver operating characteristic (ROC) curve and decision curve were used to evaluate the predictive model. Results: ΔArea(max) and Δslope(max) were independent predictive factors for pCR, OR =0.942 (95% CI : 0.918-0.967) and 0.961 (95% CI : 0.940-0.987), respectively. The area under ROC curve (AUC) for the constructed model was 0.886 (95% CI : 0.820-0.951). Decision curve showed that in the range of the threshold probability above 0.4, the predictive model presented increased net benefit as the threshold probability increased. Conclusions: The constructed predictive model for pCR is of potential clinical value, with an AUC>0.85. Meanwhile, decision curve analysis indicates the constructed predictive model has net benefit from 3 to 8 percent in the likely range of probability threshold from 80% to 90%.
Project Management Life Cycle Models to Improve Management in High-rise Construction
NASA Astrophysics Data System (ADS)
Burmistrov, Andrey; Siniavina, Maria; Iliashenko, Oksana
2018-03-01
The paper describes a possibility to improve project management in high-rise buildings construction through the use of various Project Management Life Cycle Models (PMLC models) based on traditional and agile project management approaches. Moreover, the paper describes, how the split the whole large-scale project to the "project chain" will create the factor for better manageability of the large-scale buildings project and increase the efficiency of the activities of all participants in such projects.
Code of Federal Regulations, 2010 CFR
2010-10-01
... FACILITY CONSTRUCTION AND MODERNIZATION Project Grants for Public Medical Facility Construction and... of the Public Health Service Act for construction and modernization projects designed to: (a) Eliminate or prevent imminent safety hazards as defined by Federal, State or local fire, building, or life...
48 CFR 836.602-2 - Evaluation boards.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Management projects. The Director, Office of Construction and Facilities Management, shall appoint an... appropriate for the particular project. The Director, Office of Construction and Facilities Management may... Evaluation boards. (a) The Director, Office of Construction and Facilities Management, shall appoint an...
DOT National Transportation Integrated Search
2009-05-01
Wisconsin has constructed many environmental mitigation projects in conjunction with transportation projects that have been implemented according : to the National Environmental Policy Act. Other mitigation projects have been constructed pursuant to ...
Clarifying the Construct of Occupational Engagement for Occupational Therapy Practice.
Kennedy, Jennifer; Davis, Jane A
2017-04-01
Occupational engagement (OE) has been presented as a core construct in occupational therapy; however, its broad conceptualization and confounding definitions are problematic. Clarifying the construct of OE would help occupational therapists to explicate the nature of their practice. The purpose of this study was to explore occupational therapists' perspectives of the construct of OE. Qualitative descriptive methodology was used to collect data using semistructured interviews with nine practicing occupational therapists in the Greater Toronto Area. Qualitative content analysis, using an inductive approach, was employed to uncover emerging categories. Participants spoke about transitioning from therapeutic engagement to OE with a client by following a client's path of choice. The essential elements and influencers of OE were highlighted, and the relationship between OE and occupational performance was discussed. The findings provide an initial understanding of essential elements necessary to enable clients to initiate engagement in therapy and then, subsequently, in occupations of their choice.
NASA Technical Reports Server (NTRS)
Bush, Harold
1991-01-01
Viewgraphs describing the in-space assembly and construction technology project of the infrastructure operations area of the operation technology program are presented. Th objective of the project is to develop and demonstrate an in-space assembly and construction capability for large and/or massive spacecraft. The in-space assembly and construction technology program will support the need to build, in orbit, the full range of spacecraft required for the missions to and from planet Earth, including: earth-orbiting platforms, lunar transfer vehicles, and Mars transfer vehicles.
NASA Astrophysics Data System (ADS)
Latiffi, A. Ahmad; Brahim, J.; Fathi, M. S.
2017-08-01
Building Information Modelling (BIM) concept has expanded widely in many countries for more than a decade with its role of improving current practices in construction projects. However, the understanding of BIM differs among construction players, depending on how construction players utilize the concept in their projects. Therefore, this paper aims to explore the understanding of BIM concept among construction players in the Malaysian construction industry. A literature review on BIM concept and semi-structured interviews with construction players in BIM such as client, civil and structural (C&S) engineer and mechanical and electrical (M&E) engineer, quantity surveyor (QS), contractor, facilities manager and BIM consultant have been conducted in order to achieve this study’s the aim. The results show that the understanding of BIM concept among the construction players is limited to BIM as a process and technology. It is important for the construction players to improve their understanding of BIM as it can be used to enhance performance and productivity of construction projects.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Who assesses environmental issues in Federal construction and lease construction projects? 102-80.75 Section 102-80.75 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 80-SAFETY...
ERIC Educational Resources Information Center
Keller, Edward C.; Hartman, William T.
2001-01-01
Results of study of impact of Pennsylvania Prevailing Wage Act on 25 school-construction project costs from 1992-97 and effect thereof on local school districts' taxes. All districts had higher construction costs and property taxes. Projects increased construction costs for the Commonwealth and recommends revisions in prevailing wage-rate law.…
40 CFR 40.145-3 - Projects involving construction.
Code of Federal Regulations, 2013 CFR
2013-07-01
... FEDERAL ASSISTANCE RESEARCH AND DEMONSTRATION GRANTS § 40.145-3 Projects involving construction. Research... have a fee simple or such other estate or interest in the site of the project, and rights of access, as... the project. (b) Invitations for bids or requests for proposals shall be based upon a clear and...
40 CFR 40.145-3 - Projects involving construction.
Code of Federal Regulations, 2012 CFR
2012-07-01
... FEDERAL ASSISTANCE RESEARCH AND DEMONSTRATION GRANTS § 40.145-3 Projects involving construction. Research... have a fee simple or such other estate or interest in the site of the project, and rights of access, as... the project. (b) Invitations for bids or requests for proposals shall be based upon a clear and...
DOE Office of Scientific and Technical Information (OSTI.GOV)
McCullough, M. C.; Ebeling-Koning, D.; Evans, M. C.
2012-07-01
The lessons learned during the early phase of design engineering and construction activities for the AP1000 China Project can be applied to any project involving multiple disciplines and multiple organizations. Implementation of a first-of-a-kind design to directly support construction activities utilizing resources assigned to design development and design delivery creates challenges with prioritization of activities, successful closure of issues, and communication between site organizations and the home office. To ensure successful implementation, teams were assigned and developed to directly support construction activities including prioritization of activities, site communication and ensuring closure of site emergent issues. By developing these teams, themore » organization is better suited to meet the demands of the construction schedule while continuing with design evolution of a standard plant and engineering delivery for multiple projects. For a successful project, proper resource utilization and prioritization are key for overcoming obstacles and ensuring success of the engineering organization. (authors)« less
Distinction of Concept and Discussion on Construction Idea of Smart Water Grid Project
NASA Astrophysics Data System (ADS)
Ye, Y.; Yizi, S., Sr.; Lili, L., Sr.; Sang, X.; Zhai, J.
2016-12-01
Smart water grid project includes construction of water physical grid consisting of various flow regulating infrastructures, construction of water information grid in line with the trend of intelligent technology and construction of water management grid featured by system & mechanism construction and systemization of regulation decision-making. It is the integrated platform and comprehensive carrier for water conservancy practices. Currently, there still is dispute over engineering construction idea of smart water grid which, however, represents the future development trend of water management and is increasingly emphasized. The paper, based on distinction of concept of water grid and water grid engineering, explains the concept of water grid intelligentization, actively probes into construction idea of Smart water grid project in our country and presents scientific problems to be solved as well as core technologies to be mastered for smart water grid construction.
Development of high-rise buildings: digitalization of life cycle management
NASA Astrophysics Data System (ADS)
Gusakova, Elena
2018-03-01
The analysis of the accumulated long-term experience in the construction and operation of high-rise buildings reveals not only the engineering specificity of such projects, but also systemic problems in the field of project management. Most of the project decisions are made by the developer and the investor in the early stages of the life cycle - from the acquisition of the site to the start of operation, so most of the participants in the construction and operation of the high-rise building are far from the strategic life-cycle management of the project. The solution of these tasks due to the informatization of management has largely exhausted its efficiency resource. This is due to the fact that the applied IT-systems automated traditional "inherited" processes and management structures, and, in addition, they were focused on informatization of the activities of the construction company, rather than the construction project. Therefore, in the development of high-rise buildings, the tasks of researching approaches and methods for managing the full life cycle of projects that will improve their competitiveness become topical. For this purpose, the article substantiates the most promising approaches and methods of informational modeling of high-rise construction as a basis for managing the full life cycle of this project. Reengineering of information interaction schemes for project participants is considered; formation of a unified digital environment for the life cycle of the project; the development of systems for integrating data management and project management.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 1 2010-10-01 2010-10-01 false What does a Self-Governance Tribe do if it wants to..., DEPARTMENT OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Project Assumption Process § 137.325 What does a Self-Governance Tribe do if it wants to perform a construction project under section...
DOT National Transportation Integrated Search
1976-01-01
Three construction projects affecting streams are being monitored. On two of the projects, those affecting Meadow Run and Moores Creek, the streams are being monitored for flow, suspended solids, rainfall, and benthic populations. Construction has be...
Memon, Aftab Hameed; Rahman, Ismail Abdul
2014-01-01
This study uncovered inhibiting factors to cost performance in large construction projects of Malaysia. Questionnaire survey was conducted among clients and consultants involved in large construction projects. In the questionnaire, a total of 35 inhibiting factors grouped in 7 categories were presented to the respondents for rating significant level of each factor. A total of 300 questionnaire forms were distributed. Only 144 completed sets were received and analysed using advanced multivariate statistical software of Structural Equation Modelling (SmartPLS v2). The analysis involved three iteration processes where several of the factors were deleted in order to make the model acceptable. The result of the analysis found that R 2 value of the model is 0.422 which indicates that the developed model has a substantial impact on cost performance. Based on the final form of the model, contractor's site management category is the most prominent in exhibiting effect on cost performance of large construction projects. This finding is validated using advanced techniques of power analysis. This vigorous multivariate analysis has explicitly found the significant category which consists of several causative factors to poor cost performance in large construction projects. This will benefit all parties involved in construction projects for controlling cost overrun. PMID:24693227
Memon, Aftab Hameed; Rahman, Ismail Abdul
2014-01-01
This study uncovered inhibiting factors to cost performance in large construction projects of Malaysia. Questionnaire survey was conducted among clients and consultants involved in large construction projects. In the questionnaire, a total of 35 inhibiting factors grouped in 7 categories were presented to the respondents for rating significant level of each factor. A total of 300 questionnaire forms were distributed. Only 144 completed sets were received and analysed using advanced multivariate statistical software of Structural Equation Modelling (SmartPLS v2). The analysis involved three iteration processes where several of the factors were deleted in order to make the model acceptable. The result of the analysis found that R(2) value of the model is 0.422 which indicates that the developed model has a substantial impact on cost performance. Based on the final form of the model, contractor's site management category is the most prominent in exhibiting effect on cost performance of large construction projects. This finding is validated using advanced techniques of power analysis. This vigorous multivariate analysis has explicitly found the significant category which consists of several causative factors to poor cost performance in large construction projects. This will benefit all parties involved in construction projects for controlling cost overrun.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-23
... a project labor agreement (PLA), as they may decide appropriate, on large-scale construction... efficiency in Federal procurement. A PLA is a pre-hire collective bargaining agreement with one or more labor...
Assessing performance characteristics of sediment basins constructed in Franklin County.
DOT National Transportation Integrated Search
2012-08-01
The objective of the research project was to monitor the performance of newly designed : sediment basins that were constructed on the ALDOT 502 project in Franklin County. The : project included four tasks: (1) assess performance characteristics of s...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hosking, H.
The report describes the effort by the Fish and Wildlife Service to monitor the construction of the first hydroelectric project built on national wildlife refuge lands under license by the Federal Energy Regulatory Commission. Recommendations are offered for use in planning other projects. Fish and wildlife species of concern included brown bears, Sitka black-tailed deer, mountain goats, raptors (including bald eagles), and several species of salmonid fish. Construction practices relating to erosion control, contaminant management, culvert placement, and siting of project structures are covered.
2016-09-30
Improvements Needed in Managing Scope Changes and Oversight of Construction Projects at Camp Lemonnier, Djibouti S E P T E M B E R 3 0 , 2 0 1 6 Report...Improvements Needed in Managing Scope Changes and Oversight of Construction Projects at Camp Lemonnier, Djibouti Visit us at www.dodig.mil Objective We...Findings (cont’d) ii │ DODIG-2016-141 (Project No. D2014-D000RE-0157.000) Results in Brief Improvements Needed in Managing Scope Changes and Oversight
NASA Technical Reports Server (NTRS)
1991-01-01
The Center for Space Construction at the University of Colorado at Boulder was established in 1988 as a University Space Engineering Research Center. The mission of the Center is to conduct interdisciplinary engineering research which is critical to the construction of future space structures and systems and to educate students who will have the vision and technical skills to successfully lead future space construction activities. The research activities are currently organized around two central projects: Orbital Construction and Lunar Construction. Summaries of the research projects are included.
Construction Project Management for RED HORSE Troop Training Projects
1989-02-02
estimating, scheduling, and cost control required for project management decision making in RED HORSE construction projects. The expected benefits of...After receiving tentative approval for a project, either the benefiting base engineering section or the appropriate RED HORSE squadron executes the...approved by the benefiting base commander and forwarded to RED HORSE for review. Once the design has started, the benefiting base reports to Headquarters
40 CFR 35.2036 - Design/build project grants.
Code of Federal Regulations, 2011 CFR
2011-07-01
... and performing construction management and contract administration, will be in accordance with EPA..., responsible bid; (ii) A lump sum for construction management, contract and project administration services and... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2036 Design/build...
40 CFR 35.2036 - Design/build project grants.
Code of Federal Regulations, 2013 CFR
2013-07-01
... and performing construction management and contract administration, will be in accordance with EPA..., responsible bid; (ii) A lump sum for construction management, contract and project administration services and... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2036 Design/build...
40 CFR 35.2036 - Design/build project grants.
Code of Federal Regulations, 2014 CFR
2014-07-01
... and performing construction management and contract administration, will be in accordance with EPA..., responsible bid; (ii) A lump sum for construction management, contract and project administration services and... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2036 Design/build...
DOT National Transportation Integrated Search
2017-11-01
This document serves as the final report on the construction and opening of the Roundabout Project in London, Kentucky (Kentucky Item Number 11904.1). This project (hereafter referred to as the London Roundabout) was constructed on the authority o...
ERIC Educational Resources Information Center
Kennedy, Mike
2009-01-01
When Fayette County (Kentucky) school officials began putting together estimates for upcoming renovation projects at two elementary schools, they based their projections on their district construction projects from 2007. But by February, when construction bids were opened for the renovations of Cassidy and Russell Cave elementary schools, the…
Long-term performance of a hot in-place recycling project final report.
DOT National Transportation Integrated Search
2016-08-01
This report documents the construction and long-term performance of a hot in-place recycled (HIPR) : project on SR 542. HIPR project selection, mix design, construction and testing are described. It was shown that : the HIPR process successfully reha...
DOT National Transportation Integrated Search
2016-07-01
Approximately 20 percent of the Federal-aid highway program is invested in local public agency (LPA) infrastructure projects, which is a significant portion of total Federal funds allocated to highway construction projects in the United States. In re...
The radioisotope complex project “RIC-80” at the Petersburg Nuclear Physics Institute
DOE Office of Scientific and Technical Information (OSTI.GOV)
Panteleev, V. N., E-mail: vnp@pnpi.spb.ru; Barzakh, A. E.; Batist, L. Kh.
2015-12-15
The high current cyclotron C-80 capable of producing 40-80 MeV proton beams with a current of up to 200 μA has been constructed at Petersburg Nuclear Physics Institute. One of the main goals of the C-80 is the production of a wide spectrum of medical radionuclides for diagnostics and therapy. The project development of the radioisotope complex RIC-80 (radioisotopes at the cyclotron C-80) at the beam of C-80 has been completed. The RIC-80 complex is briefly discussed in this paper. The combination of the mass-separator with the target-ion source device, available at one of the new target stations for on-linemore » or semi on-line production of a high purity separated radioisotopes, is explored in greater detail. The results of target and ion source tests for a mass-separator method for the production of high purity radioisotopes {sup 82}Sr and {sup 223,224}Ra are also presented.« less
Design study of a raster scanning system for moving target irradiation in heavy-ion radiotherapy.
Furukawa, Takuji; Inaniwa, Taku; Sato, Shinji; Tomitani, Takehiro; Minohara, Shinichi; Noda, Koji; Kanai, Tatsuaki
2007-03-01
A project to construct a new treatment facility as an extension of the existing heavy-ion medical accelerator in chiba (HIMAC) facility has been initiated for further development of carbon-ion therapy. The greatest challenge of this project is to realize treatment of a moving target by scanning irradiation. For this purpose, we decided to combine the rescanning technique and the gated irradiation method. To determine how to avoid hot and/or cold spots by the relatively large number of rescannings within an acceptable irradiation time, we have studied the scanning strategy, scanning magnets and their control, and beam intensity dynamic control. We have designed a raster scanning system and carried out a simulation of irradiating moving targets. The result shows the possibility of practical realization of moving target irradiation with pencil beam scanning. We describe the present status of our design study of the raster scanning system for the HIMAC new treatment facility.
The radioisotope complex project "RIC-80" at the Petersburg Nuclear Physics Institute.
Panteleev, V N; Barzakh, A E; Batist, L Kh; Fedorov, D V; Ivanov, V S; Moroz, F V; Molkanov, P L; Orlov, S Yu; Volkov, Yu M
2015-12-01
The high current cyclotron C-80 capable of producing 40-80 MeV proton beams with a current of up to 200 μA has been constructed at Petersburg Nuclear Physics Institute. One of the main goals of the C-80 is the production of a wide spectrum of medical radionuclides for diagnostics and therapy. The project development of the radioisotope complex RIC-80 (radioisotopes at the cyclotron C-80) at the beam of C-80 has been completed. The RIC-80 complex is briefly discussed in this paper. The combination of the mass-separator with the target-ion source device, available at one of the new target stations for on-line or semi on-line production of a high purity separated radioisotopes, is explored in greater detail. The results of target and ion source tests for a mass-separator method for the production of high purity radioisotopes (82)Sr and (223,224)Ra are also presented.
Occupational Therapy in Medicaid Home and Community-Based Services Waivers
VanPuymbrouck, Laura
2018-01-01
OBJECTIVE. Medicaid Home and Community-Based Services (HCBS) 1915(c) waivers are the largest provider of long-term services and supports for people with intellectual and developmental disabilities (IDDs). In this study, we explored how HCBS IDD waivers projected providing occupational therapy services in Fiscal Year (FY) 2015. METHOD. Medicaid HCBS IDD waivers across the nation gathered from the Centers for Medicare and Medicaid Services were qualitatively and quantitatively analyzed to determine how they projected providing occupational therapy services in terms of service expenditures and utilization. RESULTS. In FY 2015, $14.13 million of spending was projected for occupational therapy services of 7,500 participants. However, there was large heterogeneity across states and services in terms of total projected spending, spending per participant, and reimbursement rates. CONCLUSION. Comparisons across states strengthen the profession’s ability to assert the value of its services. These findings can help identify best practices and can advocate for the refinement of state occupational therapy programs. PMID:29426389
Constructions for Children: Projects in Design Technology.
ERIC Educational Resources Information Center
Eichelberger, Barbara; Larson, Connie
This book helps children develop the capability and confidence to design, construct, and evaluate working models. Projects in this book are suitable for students in grades K-4, but may be adapted for older students. Step-by-step explanations for each project are meant as guidelines and completion of the project is not limited to a single correct…
ERIC Educational Resources Information Center
Maqsood, Tayyab; Finegan, Andrew; Walker, Derek
2006-01-01
Purpose: With the advent of information and communication technologies (ICT), some organisations have endeavoured to develop and maintain systems commonly known as project histories. This paper aims to provide a framework to the construction organisations in order to improve the learning from projects through the development and use of project…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-26
... agreement (PLA), as they may decide appropriate, on large-scale construction projects, where the total cost... procurement. A PLA is a pre-hire collective bargaining agreement with one or more labor organizations that... the use of a project labor agreement (PLA), as they may decide appropriate, on large-scale...
Reinforce Design and Construction Issues with a Comprehensive Laboratory Project.
ERIC Educational Resources Information Center
Schemmel, John J.
In 1996, a comprehensive project was introduced in the first course of Reinforced Concrete Design, CVEG 4303 at the University of Arkansas. The primary purpose of this project was to highlight issues related to the construction of reinforced concrete elements. This semester-long project involves the design, fabrication, and testing of 8-foot long…
Research on Risk Manage of Power Construction Project Based on Bayesian Network
NASA Astrophysics Data System (ADS)
Jia, Zhengyuan; Fan, Zhou; Li, Yong
With China's changing economic structure and increasingly fierce competition in the market, the uncertainty and risk factors in the projects of electric power construction are increasingly complex, the projects will face huge risks or even fail if we don't consider or ignore these risk factors. Therefore, risk management in the projects of electric power construction plays an important role. The paper emphatically elaborated the influence of cost risk in electric power projects through study overall risk management and the behavior of individual in risk management, and introduced the Bayesian network to the project risk management. The paper obtained the order of key factors according to both scene analysis and causal analysis for effective risk management.
Construction project selection with the use of fuzzy preference relation
NASA Astrophysics Data System (ADS)
Ibadov, Nabi
2016-06-01
In the article, author describes the problem of the construction project variant selection during pre-investment phase. As a solution, the algorithm basing on fuzzy preference relation is presented. The article provides an example of the algorithm used for selection of the best variant for construction project. The choice is made basing on criteria such as: net present value (NPV), level of technological difficulty, financing possibilities, and level of organizational difficulty.
NASA Astrophysics Data System (ADS)
Provotorov, Ivan; Gasilov, Valentin; Anisimova, Nadezhda
2018-03-01
The structure of problems of high-rise construction us suggested, which includes the impact on environment, design solutions, transportation problems, financial costs for construction and operation, and others. Positive and negative aspects of high-rise construction are considered. One of the basic problems of high-rise construction is the problem of increased transport load. Construction of the subway on the basis of the concession mechanism, with the use of unmanned control of rolling stock is proposed as the most expedient solution. An evaluation of the effectiveness of this project is presented, it shows quite high performance indicators for a private investor. Main problems that the project implementation may face in conditions of lack of scientific and methodological support are outlined.
NASA Astrophysics Data System (ADS)
Nor Haslinda, A.; Xian, T. Wei; Norfarahayu, K.; Muhamad Hanafi, R.; Fikri, H. Muhammad
2018-04-01
Time and cost overruns have become one prominent issue for most construction projects around the world. Project costing and timeframe extension had been causing a lot of wastage and loss of opportunity for many parties involved. Therefore, this research was carried out to investigate the factors influencing time and cost overruns for high-rise construction projects in Penang, Malaysia. A set of questionnaires survey was distributed to the project managers who had been or currently involved in the high-rise building projects in Penang to get their input and perceptions for each factor identified as well as its frequency of occurrence. In order to rank all the factors gathered, the mean index of the most distinguishing factors and its frequency of occurrence were multiplied to get the severity index. The results revealed that for time overrun, the most predominant causes were due to design changes, inadequate planning and scheduling and poor labor productivity. Meanwhile, the predominant causes of cost overrun were poor pre-construction budget and material cost planning, inaccurate quantity take-off and materials cost increased by inflation. The significance of establishing the issues related to time and cost overruns for the high-rise building construction project is to provide a greater insight and understanding on the causes of delays, particularly among the main project players: contractors, client, and consultants.
Projecting Labor Requirements for Transportation-Related Construction. Final Report.
ERIC Educational Resources Information Center
Washington Technical Inst., Washington, DC. Center for Urban Services.
This report examines the urban transportation planning process and its labor market impact, including projections of opportunities for minority participation in construction, operation, and maintenance of a transportation system and forecasts of training needed in critical occupations. It was found that transportation-related construction may be…
23 CFR 230.117 - Reimbursement procedures (Federal-aid highway construction projects only).
Code of Federal Regulations, 2012 CFR
2012-04-01
... 23 Highways 1 2012-04-01 2012-04-01 false Reimbursement procedures (Federal-aid highway construction projects only). 230.117 Section 230.117 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF... Construction Contracts (Including Supportive Services) § 230.117 Reimbursement procedures (Federal-aid highway...
2017-01-01
fast food restaurants . Because these projects are not authorized and funded through the regular appropriations process for military construction...750,000 threshold for major projects. 5We selected this sample by identifying one project of each type—commissary; exchange; morale, welfare, and...of 212 possible projects. Further details of our selection process are found in appendix I. Page 3 GAO-17-76 Nonappropriated Fund
50 CFR 253.11 - Guarantee policy.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., except: (1) Vessel construction. The Program will not finance this project cost. The Program will only refinance this project cost for an existing vessel whose previous construction cost has already been financed (or otherwise paid). Refinancing this project cost for a vessel that already exists is not...
76 FR 22631 - Community Facility Loans
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-22
... restrictive language in 7 CFR part 1942 that limits projects using alternate construction methods to loans... field staff and applicants understand when a project qualifies as an alternate construction method. None... contracting method projects must comply with the requirements for ``maximum open and free competition'' in...
NASA Astrophysics Data System (ADS)
Yu, J.; Gan, Z.; Zhong, L.; Deng, L.
2018-04-01
The objective of this paper is to investigate the use of UAV remote sensing in the monitoring and management of construction projects in riparian areas through the case study of embankment construction projects' monitoring in the Three Gorges Reservoir area. A three-step approach is proposed to address the problem: data acquisition with UAV, data processing, and monitoring information extraction. The results of the case study demonstrate that UAV remote sensing is capable of providing fast and accurate measurements and calculations for the needs of monitoring of riparian constructions.
Advocating mindset for cooperative partnership for better future of construction industry
NASA Astrophysics Data System (ADS)
Omar, Datuk Wahid
2017-11-01
Construction industry players are known for their low acceptance on the changes. Hence, it is identified that the biggest challenge in the industry is changing the mindset. This paper highlights the importance of transformation in shaping for better future of the industry. Transformation favors innovation and progressive development in the industry and specifically in managing a project. Thus changes in mindset of players with an eye to the future and focus on what is coming are paramount in inculcating the transformation culture in construction eco-system. The key to the success of transformation is the collaborative and cooperative partnering which ensuring the performance of every stage of project delivery. The collaborative, cooperative and concerted effort of all parties involved in the project creates mutual understanding on mission and vision of project. Adopting healthy and harmonious project culture, implementing innovative procurement that emphasis on fair risk sharing should be a working culture. This cooperative partnership should be the future of the project undertaking in the construction industry.
World Bank oil-pipeline project designed to prevent HIV transmission.
Kigotho, A W
1997-11-29
A World Bank-funded oil pipeline project, in Chad and Cameroon, is the first large-scale construction project in sub-Saharan Africa to incorporate an HIV/AIDS prevention component. The project entails the development of oil fields in southern Chad and construction of 1100 km of pipeline to port facilities on Cameroon's Atlantic coast. 3000 construction workers from the two countries will be employed between 1998 and 2001, including about 600 truck drivers. In some areas along the pipeline route, 50% of the prostitutes (who are frequented by truck drivers) are HIV-infected. The HIV/AIDS intervention aims to prevent HIV and sexually transmitted diseases (STDs) among project workers through social marketing of condoms, treatment of STDs in prostitutes along the route, and health education to modify high-risk behaviors. The program is considered a test case for African governments and donors interested in whether the integration of a health component in major construction projects can avoid AIDS epidemics in affected countries.
Grant, Nina; Hotopf, Matthew; Breen, Gerome; Cleare, Anthony; Grey, Nick; Hepgul, Nilay; King, Sinead; Moran, Paul; Pariante, Carmine M; Wingrove, Janet; Young, Allan H; Tylee, André
2014-06-09
Depression and anxiety are highly prevalent and represent a significant and well described public health burden. Whilst first line psychological treatments are effective for nearly half of attenders, there remain a substantial number of patients who do not benefit. The main objective of the present project is to establish an infrastructure platform for the identification of factors that predict lack of response to psychological treatment for depression and anxiety, in order to better target treatments as well as to support translational and experimental medicine research in mood and anxiety disorders. Predicting outcome following psychological therapy in IAPT (PROMPT) is a naturalistic observational project that began patient recruitment in January 2014. The project is currently taking place in Southwark Psychological Therapies Service, an Improving Access to Psychological Therapies (IAPT) service currently provided by the South London and Maudsley NHS Foundation Trust (SLaM). However, the aim is to roll-out the project across other IAPT services. Participants are approached before beginning treatment and offered a baseline interview whilst they are waiting for therapy to begin. This allows us to test for relationships between predictor variables and patient outcome measures. At the baseline interview, participants complete a diagnostic interview; are asked to give blood and hair samples for relevant biomarkers, and complete psychological and social questionnaire measures. Participants then complete their psychological therapy as offered by Southwark Psychological Therapies Service. Response to psychological therapy will be measured using standard IAPT outcome data, which are routinely collected at each appointment. This project addresses a need to understand treatment response rates in primary care psychological therapy services for those with depression and/or anxiety. Measurement of a range of predictor variables allows for the detection of bio-psycho-social factors which may be relevant for treatment outcome. This will enable future clinical decision making to be based on the individual needs of the patient in an evidence-based manner. Moreover, the identification of individuals who fail to improve following therapy delivered by IAPT services could be utilised for the development of novel interventions.
Managing large energy and mineral resources (EMR) projects in challenging environments
NASA Astrophysics Data System (ADS)
Chanmeka, Arpamart
The viability of energy mineral resources (EMR) construction projects is contingent upon the state of the world economic climate. Oil sands projects in Alberta, Canada exemplify large EMR projects that are highly sensitive to fluctuations in the world market. Alberta EMR projects are constrained by high fixed production costs and are also widely recognized as one of the most challenging construction projects to successfully deliver due to impacts from extreme weather conditions, remote locations and issues with labor availability amongst others. As indicated in many studies, these hardships strain the industry's ability to execute work efficiently, resulting in declining productivity and mounting cost and schedule overruns. Therefore, to enhance the competitiveness of Alberta EMR projects, project teams are targeting effective management strategies to enhance project performance and productivity by countering the uniquely challenging environment in Alberta. The main purpose of this research is to develop industry wide benchmarking tailored to the specific constraints and challenges of Alberta. Results support quantitative assessments and identify the root causes of project performance and ineffective field productivity problems in the heavy industry sector capital projects. Customized metrics produced from the data collected through a web-based survey instrument were used to quantitatively assess project performance in the following dimensions: cost, schedule, change, rework, safety, engineering and construction productivity and construction practices. The system enables the industry to measure project performance more accurately, get meaningful comparisons, while establishing credible norms specific to Alberta projects. Data analysis to identify the root cause of performance problems was conducted. The analysis of Alberta projects substantiated lessons of previous studies to create an improved awareness of the abilities of Alberta-based companies to manage their unique projects. This investigation also compared Alberta-based projects with U.S. projects to point out the differences in project process and management strategies under different environments. The relative impact of factors affecting construction productivity were identified and validated by the input from industry experts. The findings help improve the work processes used by companies developing projects in Alberta.
20th Annual Residence Hall Construction Report
ERIC Educational Resources Information Center
Agron, Joe
2009-01-01
Even in difficult economic times, colleges and universities continue to invest in residence hall construction projects as a way to attract new students and keep existing ones on campus. According to data from "American School & University"'s 20th annual Residence Hall Construction Report, the median new project completed in 2008 was…
Interdisciplinary Approach to Building Construction.
ERIC Educational Resources Information Center
Armstrong, Harry
The paper discusses the interdisciplinary approach used by the Amity High School House Construction Project to develop a construction cluster in a small high school, to give students on-the-job training, and to teach them the relevancy of academic education. The project's monthly plan of action is briefly described. Suggested activities,…
Code of Federal Regulations, 2014 CFR
2014-01-01
... imposed by construction, equipment, material or service contracts, penalty payments, damage claims, awards... consultants with suitable experience, training and professional competence in the design and construction of... engineering services for design and construction inspection for all project facilities. Resident inspection by...
Code of Federal Regulations, 2011 CFR
2011-01-01
... imposed by construction, equipment, material or service contracts, penalty payments, damage claims, awards... consultants with suitable experience, training and professional competence in the design and construction of... engineering services for design and construction inspection for all project facilities. Resident inspection by...
The Effect of School Building Renovation/Construction on School Culture
ERIC Educational Resources Information Center
Lesisko, Lee J.; Wright, Robert J.; O'Hern, Brenda
2010-01-01
School construction or renovation projects can have a profound affect on students, faculty and administration. The literature revealed that continuous communication is essential for a smooth process. This research identified bureaucratic issues and school climate to be leading factors of concern during construction projects. Analysis of this study…
Whole-House Design and Commissioning in the Project Home Again Hot-Humid New Construction Community
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kerrigan, Philip
2012-09-01
Building Science Corporation has been working with Project Home Again since 2008 and has consulted on the design of around 100 affordable, energy efficient new construction homes for victims of hurricanes Katrina and Rita. This report details the effort on the final two phases of the project: Phases V and VI, which resulted in a total of 25 homes constructed in 2011. The goal of this project was to develop and implement an energy efficiency package that will achieve at least 20% whole house source energy savings improvement over the B10 Benchmark.
Whole-House Design and Commissioning in the Project Home Again Hot-Humid New Construction Community
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kerrigan, P.
2012-09-01
BSC has been working with Project Home Again since 2008 and has consulted on the design of around 100 affordable, energy efficient new construction homes for victims of hurricanes Katrina and Rita. This report details the effort on the final two phases of the project: Phases V and VI which resulted in a total of 25 homes constructed in 2011. The goal of this project was to develop and implement an energy efficiency package that will achieve at least 20% whole house source energy savings improvement over the B10 Benchmark.
On the delay factors of the private construction projects in Medan city
NASA Astrophysics Data System (ADS)
Perwira Mulia Tarigan, A.; Subroto
2018-03-01
The delay in construction projects undertaken by contractors is impeding the economic growth of a region. Medan city which is one of the big cities in Indonesia is suffering from it. This study aims to identify the dominant factors causing delays in construction projects conducted by private contractors. The interview method with questionnaires is used to involve 20 contractors, 10 consultants, and 10 owner representatives in the study. From the 45 identified factors causing delays, the highest ranking is the change of work demand by the project owners with 71.84% importance index.
Critical success factors in infrastructure projects
NASA Astrophysics Data System (ADS)
Zakaria, Siti Fairus; Zin, Rosli Mohamad; Mohamad, Ismail; Balubaid, Saeed; Mydin, Shaik Hussein; Mohd Rahim, E. M. Roodienyanto
2017-11-01
Construction of infrastructure project is different from buildings. The main difference is term of project site where infrastructure project need to command a long stretch while building mostly confine to a limited area. As such factors that are critical to infrastructure project may not be that significant to building project and vice versa. Flood mitigation can be classified under infrastructure projects under which their developments are planned by the government with the specific objective to reduce or avoid the negative effects of flood to the environment and livelihood. One of the indicators in project success is delay. The impact of project delay in construction industry is significant that it decelerates the projects implementation, specifically the government projects. This study attempted to identify and compare the success factors between infrastructure and building projects, as such comparison rarely found in the current literature. A model of flood mitigation projects' success factors was developed by merging the experts' views and reports from the existing literature. The experts' views were obtained from the responses to open-ended questions on the required fundamentals to achieve successful completion of flood mitigation projects. An affinity analysis was applied to these responses to develop the model. The developed model was then compared to the established success factors found in building project, extracted from the previous studies to identify the similarities and differences between the two models. This study would assist the government and construction players to become more effective in constructing successful flood mitigation projects for the future practice in a flood-prone country like Malaysia.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-19
...) from construction, operation, maintenance, and decommissioning associated with the Buckeye Wind Power... construction, operation, maintenance, and decommissioning of the project. The project consists of a 100-turbine... Draft Programmatic Agreement, Buckeye Wind Power Project, Champaign County, Ohio AGENCY: Fish and...
The Pros and Cons of Contractor Financed Approach to School Construction.
ERIC Educational Resources Information Center
Chan, T. C.
1983-01-01
Lists the advantages and disadvantages to school districts of having contractors take part in financing a school construction project when a school district has reached its full limit of borrowing capacity and necessary projected cash flow in order to complete the project. (MLF)
7 CFR 1753.80 - Minor construction procedure.
Code of Federal Regulations, 2010 CFR
2010-01-01
... same calendar year is limited to the following amounts for the following discrete categories of minor...) A single minor construction project may be a discrete element of a somewhat larger overall project... placement project. It cannot be a portion, by dividing into smaller segments, of a discrete major...
Field trial of gravel stabilization methods : Route 1, Cyr-Van Buren, ME : 2nd interim report.
DOT National Transportation Integrated Search
1995-02-01
This experimental construction project was developed, designed, and inspected by personnel from the University of Maine, Civil Engineering Staff. The experimental project was constructed on and as a part of Project #2586 00. This was a complete recon...
Field trial of gravel stabilization methods : Route 1, Cyr-Van Buren, ME : 1st interim report.
DOT National Transportation Integrated Search
1993-05-01
This experimental construction project was developed, designed, and inspected by personnel from the University of Maine, Civil Engineering Staff. The experimental project was constructed on and as a part of Project #2586.00. This was a complete recon...
46 CFR 160.040-3 - Materials, construction, workmanship, and performance requirements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Appliance, Impulse-Projected Rocket Type (and Equipment) § 160.040-3 Materials, construction, workmanship...-projected rocket type line-throwing appliances and equipment shall be of good quality suitable for the... operation aboard vessels at sea. (c) Workmanship. Impulse-projected rocket type line-throwing appliances...
46 CFR 160.040-3 - Materials, construction, workmanship, and performance requirements.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Appliance, Impulse-Projected Rocket Type (and Equipment) § 160.040-3 Materials, construction, workmanship...-projected rocket type line-throwing appliances and equipment shall be of good quality suitable for the... operation aboard vessels at sea. (c) Workmanship. Impulse-projected rocket type line-throwing appliances...
46 CFR 160.040-3 - Materials, construction, workmanship, and performance requirements.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Appliance, Impulse-Projected Rocket Type (and Equipment) § 160.040-3 Materials, construction, workmanship...-projected rocket type line-throwing appliances and equipment shall be of good quality suitable for the... operation aboard vessels at sea. (c) Workmanship. Impulse-projected rocket type line-throwing appliances...
46 CFR 160.040-3 - Materials, construction, workmanship, and performance requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Appliance, Impulse-Projected Rocket Type (and Equipment) § 160.040-3 Materials, construction, workmanship...-projected rocket type line-throwing appliances and equipment shall be of good quality suitable for the... operation aboard vessels at sea. (c) Workmanship. Impulse-projected rocket type line-throwing appliances...
46 CFR 160.040-3 - Materials, construction, workmanship, and performance requirements.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Appliance, Impulse-Projected Rocket Type (and Equipment) § 160.040-3 Materials, construction, workmanship...-projected rocket type line-throwing appliances and equipment shall be of good quality suitable for the... operation aboard vessels at sea. (c) Workmanship. Impulse-projected rocket type line-throwing appliances...
Cost estimation using ministerial regulation of public work no. 11/2013 in construction projects
NASA Astrophysics Data System (ADS)
Arumsari, Putri; Juliastuti; Khalifah Al'farisi, Muhammad
2017-12-01
One of the first tasks in starting a construction project is to estimate the total cost of building a project. In Indonesia there are several standards that are used to calculate the cost estimation of a project. One of the standards used in based on the Ministerial Regulation of Public Work No. 11/2013. However in a construction project, contractor often has their own cost estimation based on their own calculation. This research aimed to compare the construction project total cost using calculation based on the Ministerial Regulation of Public Work No. 11/2013 against the contractor’s calculation. Two projects were used as case study to compare the results. The projects were a 4 storey building located in Pantai Indah Kapuk area (West Jakarta) and a warehouse located in Sentul (West Java) which was built by 2 different contractors. The cost estimation from both contractors’ calculation were compared to the one based on the Ministerial Regulation of Public Work No. 11/2013. It is found that there were differences between the two calculation around 1.80 % - 3.03% in total cost, in which the cost estimation based on Ministerial Regulation was higher than the contractors’ calculations.
Design and Implementation of Green Construction Scheme for a High-rise Residential Building Project
NASA Astrophysics Data System (ADS)
Zhou, Yong; Huang, You Zhen
2018-06-01
This paper mainly studies the green construction scheme of a high-rise residential building project. From "four sections one environmental protection", saving material, water saving, energy saving, economical use of land and environmental protection conduct analysis and research. Adopting scientific, advanced, reasonable and economical construction technology measures, implementing green construction method. Promoting energy-saving technologies in buildings, ensuring the sustainable use of resources, Maximum savings of resources and energy, increase energy efficiency, to reduce pollution, reducing the adverse environmental impact of construction activities, ensure construction safety, build sustainable buildings.
ERIC Educational Resources Information Center
Dolan, Thomas G.
2003-01-01
Describes project delivery methods that are replacing the traditional Design/Bid/Build linear approach to the management, design, and construction of new facilities. These variations can enhance construction management and teamwork. (SLD)
Code of Federal Regulations, 2012 CFR
2012-04-01
..., STRUCTURES, AND HYDRAULICS Erosion and Sediment Control on Highway Construction Projects § 650.201 Purpose..., abatement of water pollution, and prevention of damage by sediment deposition from all construction projects...
Code of Federal Regulations, 2011 CFR
2011-04-01
..., STRUCTURES, AND HYDRAULICS Erosion and Sediment Control on Highway Construction Projects § 650.201 Purpose..., abatement of water pollution, and prevention of damage by sediment deposition from all construction projects...
Code of Federal Regulations, 2014 CFR
2014-04-01
..., STRUCTURES, AND HYDRAULICS Erosion and Sediment Control on Highway Construction Projects § 650.201 Purpose..., abatement of water pollution, and prevention of damage by sediment deposition from all construction projects...
Code of Federal Regulations, 2010 CFR
2010-04-01
..., STRUCTURES, AND HYDRAULICS Erosion and Sediment Control on Highway Construction Projects § 650.201 Purpose..., abatement of water pollution, and prevention of damage by sediment deposition from all construction projects...
Code of Federal Regulations, 2013 CFR
2013-04-01
..., STRUCTURES, AND HYDRAULICS Erosion and Sediment Control on Highway Construction Projects § 650.201 Purpose..., abatement of water pollution, and prevention of damage by sediment deposition from all construction projects...
NASA Astrophysics Data System (ADS)
Zhu, Zhi gang
2017-12-01
This paper develops a research method on the construction of the first pile in the process of the construction on an urban expressway under complicated conditions, such as the difference between the underground conditions and the exploration results,the sand formation,the whole weathered and the rich groundwater. We study the relevant technical parameters and construction organization through construction of the first pile. The results show that construction on the first pile is very important under complicated conditions and can provide a basis to continuously improve the level of the whole pile foundation construction technology, and ultimately determine the entire project feasible construction program and the successful completion of the construction project.
Constructive Cognition: Cognitive Therapy Coming of Age.
ERIC Educational Resources Information Center
Greenberg, Leslie S.
1988-01-01
Responds to Mahoney and Lyddon's review in previous article and notes that it clarifies differences between rationalist and constructivist approaches to cognitive theory. Asserts that principles of constructivist therapy are highly consistent with principles of experiential therapy. (NB)
Caring for the Caregiver: The Use of Music and Music Therapy in Grief and Trauma
ERIC Educational Resources Information Center
Loewy, Joanne V., Ed.; Hara, Andrea Frisch, Ed.
2002-01-01
A collection of reflections on music therapy interventions provided as a part of the New York City Music Therapy Relief Project, sponsored by AMTA and the Recording Academy after September 11th, 2001. Edited by Joanne V. Loewy and Andrea Frisch Hara. Each chapter is written by a different therapist involved in the project.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-09
... review process. The operational support analysis will consider the debt coverage ratio (DCR) and the... performing subsidy layering reviews for project-based voucher HAP contracts for new construction and... construction and rehabilitated housing under the project-based voucher program where the applicable State or...
Code of Federal Regulations, 2010 CFR
2010-01-01
... developing by providing structure and stability to large-scale construction projects, thereby promoting the... procurement, producing labor-management stability, and ensuring compliance with laws and regulations governing... construction projects receiving Federal financial assistance, would help to promote the economical, efficient...
Optimizing Value and Avoiding Problems in Building Schools.
ERIC Educational Resources Information Center
Brevard County School Board, Cocoa, FL.
This report describes school design and construction delivery processes used by the School Board of Brevard County (Cocoa, Florida) that help optimize value, avoid problems, and eliminate the cost of maintaining a large facility staff. The project phases are examined from project definition through design to construction. Project delivery…
18 CFR 4.1 - Initial cost statement.
Code of Federal Regulations, 2011 CFR
2011-04-01
... OF PROJECT COSTS Determination of Cost of Projects Constructed Under License § 4.1 Initial cost statement. (a) Notification of Commission. When a project is constructed under a license issued under the... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Initial cost statement...
18 CFR 4.1 - Initial cost statement.
Code of Federal Regulations, 2014 CFR
2014-04-01
... OF PROJECT COSTS Determination of Cost of Projects Constructed Under License § 4.1 Initial cost statement. (a) Notification of Commission. When a project is constructed under a license issued under the... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Initial cost statement...
Code of Federal Regulations, 2012 CFR
2012-04-01
... PROJECT COSTS Determination of Fair Value of Constructed Projects, Under Section 23(a) of the Act § 4.10... Power Act that requires the determination of the fair value of a project already constructed, the... a statement to the effect that the actual legitimate original cost, or if not known, the estimated...
18 CFR 4.1 - Initial cost statement.
Code of Federal Regulations, 2012 CFR
2012-04-01
... OF PROJECT COSTS Determination of Cost of Projects Constructed Under License § 4.1 Initial cost statement. (a) Notification of Commission. When a project is constructed under a license issued under the... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Initial cost statement...
18 CFR 4.1 - Initial cost statement.
Code of Federal Regulations, 2013 CFR
2013-04-01
... OF PROJECT COSTS Determination of Cost of Projects Constructed Under License § 4.1 Initial cost statement. (a) Notification of Commission. When a project is constructed under a license issued under the... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Initial cost statement...
Code of Federal Regulations, 2014 CFR
2014-04-01
... PROJECT COSTS Determination of Fair Value of Constructed Projects, Under Section 23(a) of the Act § 4.10... Power Act that requires the determination of the fair value of a project already constructed, the... a statement to the effect that the actual legitimate original cost, or if not known, the estimated...
Code of Federal Regulations, 2013 CFR
2013-04-01
... PROJECT COSTS Determination of Fair Value of Constructed Projects, Under Section 23(a) of the Act § 4.10... Power Act that requires the determination of the fair value of a project already constructed, the... a statement to the effect that the actual legitimate original cost, or if not known, the estimated...
36 CFR 72.33 - Timing and duration of projects.
Code of Federal Regulations, 2013 CFR
2013-07-01
..., Rehabilitation and Innovation § 72.33 Timing and duration of projects. (a) Construction components of projects... completing construction components of either Rehabilitation or Innovation proposals will be limited to three... Program, and of benefit to the federal government. Any component of an Innovation proposal which is to...
36 CFR 72.33 - Timing and duration of projects.
Code of Federal Regulations, 2010 CFR
2010-07-01
..., Rehabilitation and Innovation § 72.33 Timing and duration of projects. (a) Construction components of projects... completing construction components of either Rehabilitation or Innovation proposals will be limited to three... Program, and of benefit to the federal government. Any component of an Innovation proposal which is to...
36 CFR 72.33 - Timing and duration of projects.
Code of Federal Regulations, 2014 CFR
2014-07-01
..., Rehabilitation and Innovation § 72.33 Timing and duration of projects. (a) Construction components of projects... completing construction components of either Rehabilitation or Innovation proposals will be limited to three... Program, and of benefit to the federal government. Any component of an Innovation proposal which is to...
36 CFR 72.33 - Timing and duration of projects.
Code of Federal Regulations, 2011 CFR
2011-07-01
..., Rehabilitation and Innovation § 72.33 Timing and duration of projects. (a) Construction components of projects... completing construction components of either Rehabilitation or Innovation proposals will be limited to three... Program, and of benefit to the federal government. Any component of an Innovation proposal which is to...
36 CFR 72.33 - Timing and duration of projects.
Code of Federal Regulations, 2012 CFR
2012-07-01
..., Rehabilitation and Innovation § 72.33 Timing and duration of projects. (a) Construction components of projects... completing construction components of either Rehabilitation or Innovation proposals will be limited to three... Program, and of benefit to the federal government. Any component of an Innovation proposal which is to...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-06
... Proposed Information Collection to OMB Multifamily Project Applications and Construction Prior to Initial... facilities is also required as part of the application for firm commitment for mortgage insurance. Project owners/sponsors may apply for permission to commence construction prior to initial endorsement. DATES...
Project-Based Learning and Student Knowledge Construction during Asynchronous Online Discussion
ERIC Educational Resources Information Center
Koh, Joyce Hwee Ling; Herring, Susan C.; Hew, Khe Foon
2010-01-01
Project-based learning engages students in problem solving through artefact design. However, previous studies of online project-based learning have focused primarily on the dynamics of online collaboration; students' knowledge construction throughout this process has not been examined thoroughly. This case study analyzed the relationship between…
32 CFR 644.4 - Reservoir projects.
Code of Federal Regulations, 2011 CFR
2011-07-01
... projects. 8.1Lands for reservoir construction and operation. 8.2Additional lands for correlative purposes... potentials of each reservoir. 8.1Lands for reservoir construction and operation. The fee title will be... 32 National Defense 4 2011-07-01 2011-07-01 false Reservoir projects. 644.4 Section 644.4 National...
32 CFR 644.4 - Reservoir Projects.
Code of Federal Regulations, 2010 CFR
2010-07-01
... projects. 8.1Lands for reservoir construction and operation. 8.2Additional lands for correlative purposes... potentials of each reservoir. 8.1Lands for reservoir construction and operation. The fee title will be... 32 National Defense 4 2010-07-01 2010-07-01 true Reservoir Projects. 644.4 Section 644.4 National...
Annual Program: Library Services and Construction Act, 1987-1988.
ERIC Educational Resources Information Center
South Carolina State Library, Columbia.
This report presents the 1978-1988 annual Library Services and Construction Act (LSCA) program for the South Carolina State Library. This program includes fiscal information and project descriptions for the following LCSA projects under Title I-Library Services: (1) Projects IA-General Administration; (2) IB-Library Interpretation; (3) IIA-General…
77 FR 38723 - Safety Zones; Sellwood Bridge Project, Willamette River; Portland, OR
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-29
...-AA00 Safety Zones; Sellwood Bridge Project, Willamette River; Portland, OR AGENCY: Coast Guard, DHS... effect throughout the duration of the construction and renewal of the Sellwood Bridge located on the... the construction area while transiting in the vicinity of the Sellwood Bridge project; however, the...
77 FR 14970 - Safety Zones; Sellwood Bridge Project, Willamette River; Portland, OR
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-14
...-AA00 Safety Zones; Sellwood Bridge Project, Willamette River; Portland, OR AGENCY: Coast Guard, DHS... effect throughout the duration of the construction and renewal of the Sellwood Bridge on the Willamette... construction area while transiting in the vicinity of the Sellwood Bridge project; however, the establishment...
28 CFR 91.58 - Timing of the environmental review process.
Code of Federal Regulations, 2010 CFR
2010-07-01
... decisions or new commitments of resources can be made on these projects by the State or local entity that... specifications; or (5) Purchasing property. (e) Ongoing or completed construction projects. For grant-funded... been done, making every effort to limit disruption to projects under construction. For completed grant...
Relational approach in managing construction project safety: a social capital perspective.
Koh, Tas Yong; Rowlinson, Steve
2012-09-01
Existing initiatives in the management of construction project safety are largely based on normative compliance and error prevention, a risk management approach. Although advantageous, these approaches are not wholly successful in further lowering accident rates. A major limitation lies with the approaches' lack of emphasis on the social and team processes inherent in construction project settings. We advance the enquiry by invoking the concept of social capital and project organisational processes, and their impacts on project safety performance. Because social capital is a primordial concept and affects project participants' interactions, its impact on project safety performance is hypothesised to be indirect, i.e. the impact of social capital on safety performance is mediated by organisational processes in adaptation and cooperation. A questionnaire survey was conducted within Hong Kong construction industry to test the hypotheses. 376 usable responses were received and used for analyses. The results reveal that, while the structural dimension is not significant, the mediational thesis is generally supported with the cognitive and relational dimensions affecting project participants' adaptation and cooperation, and the latter two processes affect safety performance. However, the cognitive dimension also directly affects safety performance. The implications of these results for project safety management are discussed. Copyright © 2011 Elsevier Ltd. All rights reserved.
van Hooren, Susan; van der Veld, William M.; Hutschemaekers, Giel
2017-01-01
Abstract Despite the use of art therapy in clinical practice, its appreciation and reported beneficial results, no instruments are available to measure specific effects of art therapy among patients with personality disorders cluster B/C in multidisciplinary treatment. In the present study, we described the development and psychometric evaluation of the Self‐expression and Emotion Regulation in Art Therapy Scale (SERATS). Structural validity (exploratory and confirmatory factor analysis), reliability, construct validity and sensitivity to change were examined using two independent databases (n = 335; n = 34) of patients diagnosed with personality disorders cluster B/C. This resulted in a nine‐item effect scale with a single factor with a high internal reliability and high test–retest reliability; it demonstrated discriminant validity and sensitivity to change. In conclusion, the SERATS is brief and content‐valid and offers objective and reliable information on self‐expression and emotion regulation in art therapy among patients with personality disorders cluster B/C. Although more research on construct validity is needed, the SERATS is a promising tool to be applied as an effect scale and as a monitoring tool during art therapy treatment. © 2017 The Authors Personality and Mental Health Published by John Wiley & Sons Ltd PMID:28730717
W. H. Reid; D. B. McKeever
Estimates of the amounts of wood products used in constructing civil conservation and development projects by the Corps of Engineers in the United States are presented for the years 1962 and 1978. Amounts of lumber, laminated lumber, poles and piling, and plywood used in construction are stratified by five construction categories, and three types of uses. Estimates of...
AASHTOWare Preconstruction Preliminary Investigation
DOT National Transportation Integrated Search
2017-12-17
The AKDOT&PF Northern Region construction section has successfully implemented AASHTOWare SiteManager on all construction projects. This project is to investigate and test the AASHTOWare Preconstruction module for statewide implementation. This proje...
23 CFR 772.19 - Construction noise.
Code of Federal Regulations, 2013 CFR
2013-04-01
... construction of the project. The identification is to be performed during the project development studies. (b... achieved and the overall adverse social, economic, and environmental effects and costs of the abatement...
23 CFR 772.19 - Construction noise.
Code of Federal Regulations, 2012 CFR
2012-04-01
... construction of the project. The identification is to be performed during the project development studies. (b... achieved and the overall adverse social, economic, and environmental effects and costs of the abatement...
23 CFR 772.19 - Construction noise.
Code of Federal Regulations, 2014 CFR
2014-04-01
... construction of the project. The identification is to be performed during the project development studies. (b... achieved and the overall adverse social, economic, and environmental effects and costs of the abatement...
49 CFR 1150.6 - Financial information.
Code of Federal Regulations, 2010 CFR
2010-10-01
...) A present value determination of the full costs of the proposal. If construction is proposed, the... projected net income for 2 years, based upon traffic projections. Where construction is contemplated, the...
49 CFR 1150.6 - Financial information.
Code of Federal Regulations, 2012 CFR
2012-10-01
...) A present value determination of the full costs of the proposal. If construction is proposed, the... projected net income for 2 years, based upon traffic projections. Where construction is contemplated, the...
49 CFR 1150.6 - Financial information.
Code of Federal Regulations, 2014 CFR
2014-10-01
...) A present value determination of the full costs of the proposal. If construction is proposed, the... projected net income for 2 years, based upon traffic projections. Where construction is contemplated, the...
49 CFR 1150.6 - Financial information.
Code of Federal Regulations, 2011 CFR
2011-10-01
...) A present value determination of the full costs of the proposal. If construction is proposed, the... projected net income for 2 years, based upon traffic projections. Where construction is contemplated, the...
49 CFR 1150.6 - Financial information.
Code of Federal Regulations, 2013 CFR
2013-10-01
...) A present value determination of the full costs of the proposal. If construction is proposed, the... projected net income for 2 years, based upon traffic projections. Where construction is contemplated, the...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-02
..., modifications to 4 existing substations, a 345-kV switchyard, maintenance access roads, temporary construction... will address the construction, operation, and maintenance of Basin Electric's proposed Project. The Project includes construction, operation and maintenance of approximately 190 miles of new 345-kV single...
Code of Federal Regulations, 2014 CFR
2014-01-01
... justified); is for construction and seeks to package or consolidate discrete construction projects; or if a... alternatives may include: (A) Breaking up the procurement into smaller discrete procurements, especially construction acquisitions that can be procured as separate projects; (B) Breaking out one or more discrete...
Code of Federal Regulations, 2010 CFR
2010-10-01
... compliance of health and safety codes during construction projects being performed by a Self-Governance Tribe... SERVICES TRIBAL SELF-GOVERNANCE Construction Roles of the Secretary in Establishing and Implementing Construction Project Agreements § 137.368 Is the Secretary responsible for oversight and compliance of health...
Misconceptions of a School Construction Project
ERIC Educational Resources Information Center
Rosenberg, David
2004-01-01
Just as technology has changed the way teachers teach and students learn, so too has technology transformed the way our industry manages school construction programs. Gone are the days when a school construction project had to be planned around the limitations of the contractor rather than the needs of students. Also different are the ways schools…
Challenges in Construction Over Soft Soil - Case Studies in Malaysia
NASA Astrophysics Data System (ADS)
Mohamad, N. O.; Razali, C. E.; Hadi, A. A. A.; Som, P. P.; Eng, B. C.; Rusli, M. B.; Mohamad, F. R.
2016-07-01
Construction on soft ground area is a great challenge in the field of geotechnical engineering. Many engineering problems in the form of slope instability, bearing capacity failure or excessive settlement could occur either during or after the construction phase due to low shear strength and high compressibility of this soil. As main technical agencies responsible for implementation of development projects for Government of Malaysia, Public Works Department has vast experience in dealing with this problematic soil over the years. This paper discussed and elaborate on the engineering problems encountered in construction projects that have been carried out by PWD, namely Core Facilities Building of Polytechnic Kota Kinabalu in Sabah and Hospital Tengku Ampuan Rahimah Integration Quarters in Klang, Selangor. Instability of the ground during construction works had caused delay and cost overrun in completion of the project in Selangor, whereas occurrence of continuous post construction settlement had affected the integrity and serviceability of the building in Sabah. The causes of failure and proposed rehabilitation work for both projects also will be discussed in brief.
Enhancing Knowledge Sharing Management Using BIM Technology in Construction
Ho, Shih-Ping; Tserng, Hui-Ping
2013-01-01
Construction knowledge can be communicated and reused among project managers and jobsite engineers to alleviate problems on a construction jobsite and reduce the time and cost of solving problems related to constructability. This paper proposes a new methodology for the sharing of construction knowledge by using Building Information Modeling (BIM) technology. The main characteristics of BIM include illustrating 3D CAD-based presentations and keeping information in a digital format and facilitation of easy updating and transfer of information in the BIM environment. Using the BIM technology, project managers and engineers can gain knowledge related to BIM and obtain feedback provided by jobsite engineers for future reference. This study addresses the application of knowledge sharing management using BIM technology and proposes a BIM-based Knowledge Sharing Management (BIMKSM) system for project managers and engineers. The BIMKSM system is then applied in a selected case study of a construction project in Taiwan to demonstrate the effectiveness of sharing knowledge in the BIM environment. The results demonstrate that the BIMKSM system can be used as a visual BIM-based knowledge sharing management platform by utilizing the BIM technology. PMID:24723790
Enhancing knowledge sharing management using BIM technology in construction.
Ho, Shih-Ping; Tserng, Hui-Ping; Jan, Shu-Hui
2013-01-01
Construction knowledge can be communicated and reused among project managers and jobsite engineers to alleviate problems on a construction jobsite and reduce the time and cost of solving problems related to constructability. This paper proposes a new methodology for the sharing of construction knowledge by using Building Information Modeling (BIM) technology. The main characteristics of BIM include illustrating 3D CAD-based presentations and keeping information in a digital format and facilitation of easy updating and transfer of information in the BIM environment. Using the BIM technology, project managers and engineers can gain knowledge related to BIM and obtain feedback provided by jobsite engineers for future reference. This study addresses the application of knowledge sharing management using BIM technology and proposes a BIM-based Knowledge Sharing Management (BIMKSM) system for project managers and engineers. The BIMKSM system is then applied in a selected case study of a construction project in Taiwan to demonstrate the effectiveness of sharing knowledge in the BIM environment. The results demonstrate that the BIMKSM system can be used as a visual BIM-based knowledge sharing management platform by utilizing the BIM technology.
NASA Astrophysics Data System (ADS)
Danilochkina, Nadezhda; Lukmanova, Inessa; Roshchina, Olga; Voytolovskiy, Nikolay
2018-03-01
The article presents the analysis of working capital in the process of financial support of high-rise construction investment projects. The factors influencing the choice of the working capital management model were analyzed, the reasons of the change in the requirement for the values of current assets in the process of construction of high-rise facilities were determined. The author has developed the scheme of interrelation between production, operational and financial activity cycles of enterprises implementing investment projects of unique buildings and structures and made a comparative description of their financing sources.
High-rise construction as a method for architectural development of megapolises
NASA Astrophysics Data System (ADS)
Kankhva, Vadim
2018-03-01
The article analyzes the current state of urban development in Moscow, there are revealed the insights into pattern of large investment projects. The regulatory framework as well as the state and the forecast of housing funds are scrutinized. A number of problems, that are related to the implementation of high-rise construction projects at all stages of the life cycles, are highlighted by the example of unique facilities, which are under construction or have already been built. Substantiation of high-rise construction by the transport hubs in megapolises is given. There are also considered main advantages of Moscow renovation project and criticism against it.
Developing a global psychotherapeutic approach to schizophrenia: results of a five-year follow-up.
Alanen, Y. O.; Räkköläinen, V.; Rasimus, R.; Laakso, J.; Kaljonen, A.
1985-01-01
This is an account of a long-range action research project to determine indications for and effects of a comprehensive psychotherapeutic approach, including various treatment modalities, in the treatment of schizophrenics. Four diagnostic groups were established among the 100 patients. In the course of data analysis, the group of typical schizophrenics (56 percent) was contrasted to or compared with the entire series. A further diagnostic differentiation was established according to ego functioning; i.e., imminent, acute, regressive, and paranoid ego disintegrations, respectively. Patients and family members were interviewed upon admission, and again two and five years later, and the data recorded on a 163-item form from which 40 clinical and psychosocial variables were constructed after the baseline examinations. In addition to cross-tabulation, logistic regression analysis was employed. The conclusion that the follow-up study supports the effectiveness of our global psychotherapeutic approach to treating schizophrenia seems justified. Results so far indicate that five modes of therapy in addition to drug treatments are optimal for different patients. The five modes are long-term individual psychotherapy, couple or conjoint family therapy for married patients, family therapy with the family of origin, flexible short-term crisis intervention with a family focus, and extensive long-term treatment focused on social rehabilitation for the most ill-starred patients. PMID:4049919
Lu, Shukuan; Hu, Hong; Yu, Xianbo; Long, Jiangying; Jing, Bowen; Zong, Yujin; Wan, Mingxi
2018-03-01
Pulse-echo imaging technique can only play a role when high intensity focused ultrasound (HIFU) is turned off due to the interference between the primary HIFU signal and the transmission pulse. Passive acoustic mapping (PAM) has been proposed as a tool for true real-time monitoring of HIFU therapy. However, the most-used PAM algorithm based on time exposure acoustic (TEA) limits the quality of cavitation image. Recently, robust Capon beamformer (RCB) has been used in PAM to provide improved resolution and reduced artifacts over TEA-based PAM, but the presented results have not been satisfactory. In the present study, we applied an eigenspace-based RCB (EISRCB) method to further improve the PAM image quality. The optimal weighting vector of the proposed method was found by projecting the RCB weighting vector onto the desired vector subspace constructed from the eigenstructure of the covariance matrix. The performance of the proposed PAM was validated by both simulations and in vitro histotripsy experiments. The results suggested that the proposed PAM significantly outperformed the conventionally used TEA and RCB-based PAM. The comparison results between pulse-echo images of the residual bubbles and cavitation images showed the potential of our proposed PAM in accurate localization of cavitation activity during HIFU therapy. Copyright © 2017 Elsevier B.V. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Leib, Thomas; Cole, Dan
In late September 2014 development of the Lake Charles Clean Energy (LCCE) Plant was abandoned resulting in termination of Lake Charles Carbon Capture and Sequestration (CCS) Project which was a subset the LCCE Plant. As a result, the project was only funded through Phase 2A (Design) and did not enter Phase 2B (Construction) or Phase 2C (Operations). This report was prepared relying on information prepared and provided by engineering companies which were engaged by Leucadia Energy, LLC to prepare or review Front End Engineering and Design (FEED) for the Lake Charles Clean Energy Project, which includes the Carbon Capture andmore » Sequestration (CCS) Project in Lake Charles, Louisiana. The Lake Charles Carbon Capture and Sequestration (CCS) Project was to be a large-scale industrial CCS project intended to demonstrate advanced technologies that capture and sequester carbon dioxide (CO 2) emissions from industrial sources into underground formations. The Scope of work was divided into two discrete sections; 1) Capture and Compression prepared by the Recipient Leucadia Energy, LLC, and 2) Transport and Sequestration prepared by sub-Recipient Denbury Onshore, LLC. Capture and Compression-The Lake Charles CCS Project Final Technical Report describes the systems and equipment that would be necessary to capture CO 2 generated in a large industrial gasification process and sequester the CO 2 into underground formations. The purpose of each system is defined along with a description of its equipment and operation. Criteria for selection of major equipment are provided and ancillary utilities necessary for safe and reliable operation in compliance with environmental regulations are described. Construction considerations are described including a general arrangement of the CCS process units within the overall gasification project. A cost estimate is provided, delineated by system area with cost breakdown showing equipment, piping and materials, construction labor, engineering, and other costs. The CCS Project Final Technical Report is based on a Front End Engineering and Design (FEED) study prepared by SK E&C, completed in [June] 2014. Subsequently, Fluor Enterprises completed a FEED validation study in mid-September 2014. The design analyses indicated that the FEED package was sufficient and as expected. However, Fluor considered the construction risk based on a stick-build approach to be unacceptable, but construction risk would be substantially mitigated through utilization of modular construction where site labor and schedule uncertainty is minimized. Fluor’s estimate of the overall EPC project cost utilizing the revised construction plan was comparable to SKE&C’s value after reflecting Fluor’s assessment of project scope and risk characteristic. Development was halted upon conclusion of Phase 2A FEED and the project was not constructed.Transport and Sequestration – The overall objective of the pipeline project was to construct a pipeline to transport captured CO 2 from the Lake Charles Clean Energy project to the existing Denbury Green Line and then to the Hastings Field in Southeast Texas to demonstrate effective geologic sequestration of captured CO 2 through commercial EOR operations. The overall objective of the MVA portion of the project was to demonstrate effective geologic sequestration of captured CO 2 through commercial Enhanced Oil Recovery (EOR) operations in order to evaluate costs, operational processes and technical performance. The DOE target for the project was to capture and implement a research MVA program to demonstrate the sequestration through EOR of approximately one million tons of CO 2 per year as an integral component of commercial operations.« less
Constructing a Stereographic Projection Model
ERIC Educational Resources Information Center
Lovett, D. R.; King, G. D.
1978-01-01
Explains how to construct a three dimensional model for stereographic projection. It will be suitable for presenting the symmetry of crystal systems, and will help physics students understand the nature of crystallography. (GA)
A Child Welfare Agency Project: Therapy for Families of Status Offenders.
ERIC Educational Resources Information Center
Michaels, Kenneth W.; Green, Robert H.
1979-01-01
Describes a pilot project in York, Pennsylvania which provides therapy for the families of status offender youths (i.e. incorrigibles, runaways, truants). Results indicate that the program is effective in reducing placements and costs. (BD)
3D Modeling as Method for Construction and Analysis of Graphic Objects
NASA Astrophysics Data System (ADS)
Kheyfets, A. L.; Vasilieva, V. N.
2017-11-01
The use of 3D modeling when constructing and analyzing perspective projections and shadows is considered. The creation of photorealistic image is shown. The perspective of the construction project and characterization of its image are given as an example. The authors consider the construction of a dynamic block as a means of graphical information storage and automation of geometric constructions. The example of the dynamic block construction at creating a truss node is demonstrated. The constructions are considered as applied to the Auto-CAD software. The paper is aimed at improving the graphic methods of architectural design and improving the educational process when training the Bachelor’s degree students majoring in construction.
25 CFR 170.473 - What happens when a construction project ends?
Code of Federal Regulations, 2010 CFR
2010-04-01
... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... inspection, as well as contractors and maintenance personnel. (2) All project information must be made...
NASA Astrophysics Data System (ADS)
Farhayu Ariffin, Nur; Jaafar, Mohd Faizal Md; Idris Ali, Mohamad; Irwan Ramli, Noram; Muthusamy, Khairunisa; Shukor Lim, Nor Hasanah Abdul
2018-03-01
In Malaysia, the construction sector is one of the important sectors that contribute to economic growth and employments. However, a major concern facing the construction industry is the growing rate of delays in project delivery. In the worse cases, the projects were abandoned due to some reasons when the contract period ended. Abandoned building defines as construction work that has been continuously stalled for 6 months or more, during the project completion period or beyond the scheduled date of completion. When the projects become abandoned, it gives an adverse effect on many parties such as the developer, contractor, consultant and also client. According to previous researchers, the abandonment of building causes a serious problem and need some mitigation plan to avoid this problem from occurring. This study will investigate the fundamental factors that contribute to the abandonment of building and projects in Malaysia based on the current data of the abandoned building in most states in Malaysia. The data was collected from the respondents who is in the construction industry and had experience working with abandoned housing project. Form the respondents perspective, it shows that the main factor contribute to the building abandonment is due to the financial problem facing by the developer company.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-07
... Southside Expansion Project (Project) involving construction and operation of facilities by Transcontinental... Beginning at 6:30 p.m., Brian's Restaurant (upstairs room), 625 East Atlantic Ave., South Hill, VA 23970.... The Project would include construction and operation of the following facilities: Approximately 91.4...
The project is an integrative educational and research project that will revolutionize design and construction methods towards more sustainable buildings. The project will develop and test new product design concepts using bio-composite materials in load-bearing and fa&cced...
THE CONSTRUCTION AND VALIDATION OF A MEASURE OF VOCATIONAL MATURITY.
ERIC Educational Resources Information Center
CLARY, JOE R.; WESTBROOK, BERT W.
THIS REPORT DEALS WITH THE ORGANIZATION, RATIONALE, METHODS AND EXPECTED END-PRODUCTS OF A RESEARCH PROJECT (SCHEDULED FOR COMPLETION ON JUNE 23, 1970) FOR THE CONSTRUCTION AND VALIDATION OF A RELIABLE VOCATIONAL MATURITY MEASURE (VMM). THE PROJECT'S EIGHT PHASES AND ACTIVITIES ARE EXPLAINED. THE PROJECT ASSUMES--(1) THE INDIVIDUAL AND SOCIETY AS…
Albuquerque's constructed wetland pilot project for wastewater polishing
Michael D. Marcus; Shannon M. House; Nathan A. Bowles; Robert T. Sekiya; J. Steven Glass
1999-01-01
The City of Albuquerque has funded the Constructed Wetland Pilot Project (CWPP) since 1995 at the City's Southside Water Reclamation Plant (SWRP). Results from CWPP and other wetland treatment projects indicate that appropriately designed surface-flow wetlands could increase the cost-efficiencies of wastewater treatment, as well as help the City meet present and...
B-WEST Regional Workforce Training Center. Building Workers Entering Skilled Trades. Final Report.
ERIC Educational Resources Information Center
Portland Community Coll., OR.
The B-WEST (Building Workers Entering Skilled Trades) project was an 18-month demonstration project at a campus of Portland Community College (Oregon). During the B-WEST project, the following programs/components were developed: (1) a model building construction (electrical, mechanical, construction) trades program for unemployed and underemployed…
LSCA (Library Services and Construction Act, Title I) Special Project Reports, Fiscal Year 1976.
ERIC Educational Resources Information Center
Massachusetts State Board of Library Commissioners, Boston.
This collection of reports provides the objectives, background information, project descriptions, and evaluations for 16 public library programs funded through the Library Services and Construction Act in Massachusetts during FY 1976. The projects reflect the efforts being made by librarians to provide services to segments of their population who…
40 CFR 35.915-1 - Reserves related to the project priority list.
Code of Federal Regulations, 2011 CFR
2011-07-01
... § 35.908(b)(1)) for construction projects which use innovative or alternative waste water treatment... AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.915-1 Reserves related to the project priority list. In developing the fundable...
40 CFR 35.915-1 - Reserves related to the project priority list.
Code of Federal Regulations, 2010 CFR
2010-07-01
... § 35.908(b)(1)) for construction projects which use innovative or alternative waste water treatment... AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.915-1 Reserves related to the project priority list. In developing the fundable...
Constructing a Social Justice Tour: Pedagogy, Race, and Student Learning through Geography
ERIC Educational Resources Information Center
Barnd, Natchee
2016-01-01
This article describes a high-impact learning project that combines geography, history, and ethnic studies. It describes the construction of the course, student outcomes, and the final and publicly presented collaborative project: the Social Justice Tour of Corvallis. Based on work in a small largely white town, this project presents a…
NASA Astrophysics Data System (ADS)
Shibayeva, Marina; Serebryakova, Yelena; Shalnev, Oleg
2017-10-01
Growing demand to increase the investment volume in modernization and development projects for transport infrastructure define the urgency of the current study. The amount of private sector investments in the field is insufficient to implement the projects for road construction due to their significant capital intensity and long payoff period. The implementation of social significant infrastructure projects on the principles of public-private partnership is one of the key strategic directions of growth for transport facilities. The authors come up with a concept and methodology for modeling the investment and innovation activity in the transport facility construction. Furthermore, there is developed a model to find the balance between public and private sector investments in implementing construction projects for transport infrastructure with involvement of PPP (further - public-private partnership). The suggested concepts aim to improve the efficiency rate of the investment and innovation activity in the field of transport facility construction on the basis of public and private sectors collaboration.
NASA Astrophysics Data System (ADS)
Slagle, James H.; Hill, John M.; Davison, Warren B.; Hart, Wood; Teran, Jose U.
1998-08-01
Planning, estimating, and building a telescope and its enclosure within a budget is a challenge to any project staff. The Large Binocular Telescope (LBT) project office goal has been to break every phase of the project into small packages and competitively bid the packages. In this way the project office can minimize costs and keep the project budget from escalating out of control. This paper will discuss both the unique and common problems associated with the building of telescopes into the next millennium. The discussion is centered on the planning and execution phases of construction for the LBT, located on Mt. Graham in Arizona. The paper will discuss the effects of delays on the actual start of the telescope due to environmental issues and the impact the delays had on design and budget. The paper will provide the solutions that have been incorporated by the LBT project office to maximize the quality of construction while holding costs to a minimum. The use of a team approach by the contractors, engineers, and the project office has been successful in maintaining quality construction at a reasonable cost.
Hospital renovation projects: phased construction requires planning at its best.
Cox, J C
1986-01-01
Building a new hospital facility is a difficult task, but adding onto and renovating an existing structure while normal activity continues is even more difficult. Project planners, designers, contractors, and hospital managers must carefully program the joint effort of construction and hospital operation. Several factors in the construction process and potential problems for hospital operations are described to help hospital managers better anticipate difficulties before plans are finalized and construction commences.
Whitetopping construction and early performance in Illinois
DOT National Transportation Integrated Search
2002-06-01
Seven experimental whitetopping projects were constructed in Illinois between 1998 and 2001. Three of these projects included the rehabilitation of intersections, while the remaining four were a rehabilitation of mainline pavement. The three intersec...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1970-03-01
The work described in this volume of ``S`` Projects History is an extension of the type of work described in Volume I. E.I. du Pont de flemours & Company had entered into Contract AT (07-2)-l with the United States Atomic Energy Commission to develop, design, construct, install, and operate facilities to produce heavy water, fissionable materials, and related products. Under this contract,, Du Pont constructed and operated the Savannah River Plant. The engineering, design, and construction for most of the larger ``S`` projects was performed by the Engineering DeDartment. For some of the large and many of the smaller projectsmore » the Engineering Department was responsible only for the construction because the Atomic Energy Division (AED) of the Explosives Department handled the other phases. The Engineering Department Costruction Division also performed the physical work for many of the plant work orders. This volume includes a general description of the Du Pont Engineering Department activities pertaining to the engineering, design, and construction of the ``S`` projects at the Savannah River Plant; brief summaries of the projects and principal work requests; and supplementary informaticn on a few subjects in Volume I for which final data was not available at the closing date. Projects and other plant engineering work which were handled entirely by the Explosives Department -- AED are not included in this history.« less
Supply and Demand for Radiation Oncology in the United States: Updated Projections for 2015 to 2025
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pan, Hubert Y.; Haffty, Bruce G.; Falit, Benjamin P.
Purpose: Prior studies have forecasted demand for radiation therapy to grow 10 times faster than the supply between 2010 and 2020. We updated these projections for 2015 to 2025 to determine whether this imbalance persists and to assess the accuracy of prior projections. Methods and Materials: The demand for radiation therapy between 2015 and 2025 was estimated by combining current radiation utilization rates determined by the Surveillance, Epidemiology, and End Results data with population projections provided by the US Census Bureau. The supply of radiation oncologists was forecast by using workforce demographics and full-time equivalent (FTE) status provided by themore » American Society for Radiation Oncology (ASTRO), current resident class sizes, and expected survival per life tables from the US Centers for Disease Control. Results: Between 2015 and 2025, the annual total number of patients receiving radiation therapy during their initial treatment course is expected to increase by 19%, from 490,000 to 580,000. Assuming a graduating resident class size of 200, the number of FTE physicians is expected to increase by 27%, from 3903 to 4965. In comparison with prior projections, the new projected demand for radiation therapy in 2020 dropped by 24,000 cases (a 4% relative decline). This decrease is attributable to an overall reduction in the use of radiation to treat cancer, from 28% of all newly diagnosed cancers in the prior projections down to 26% for the new projections. By contrast, the new projected supply of radiation oncologists in 2020 increased by 275 FTEs in comparison with the prior projection for 2020 (a 7% relative increase), attributable to rising residency class sizes. Conclusion: The supply of radiation oncologists is expected to grow more quickly than the demand for radiation therapy from 2015 to 2025. Further research is needed to determine whether this is an appropriate correction or will result in excess capacity.« less
ERIC Educational Resources Information Center
Healthy Schools Network, Inc., Albany, NY.
This guide presents cautionary tips for protecting children's health during school renovation and construction projects, the New York state laws regarding school renovation and construction, and the steps the laws require to eliminate dangerous conditions for children during these projects. Included is a checklist of uniform safety standards…
Relevance of Partnering as an Alternative Approach to Management of Construction Projects in Ghana
ERIC Educational Resources Information Center
Ansah, Samuel Kwame; Awere, Eric; Edu-Buandoh, Kobina Badu Micah
2016-01-01
Understandably, clients in both the public and the private sectors in Ghanaian construction industry have become increasingly dissatisfied. What they see is unpredictability and under-performance. What they receive is too often of poor quality, late and over-priced. More often contractors enter the construction project focusing on achieving their…
Code of Federal Regulations, 2010 CFR
2010-04-01
... 25 Indians 1 2010-04-01 2010-04-01 false Can tribal transportation planning funds be used for road construction and other projects? 170.405 Section 170.405 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian...
Potential Pacific Rim demand for construction-grade softwood logs.
Donald F. Flora; Richard R. Vlosky
1986-01-01
Markets for small lower grade ("construction-grade"), softwood logs are projected to expand steadily through 1995. Log supplies will lag slightly behind demand until 1990, generating about a 10-percent increase in prices. Prices are expected to be level thereafter. United States exports of construction-grade logs are projected to increase 35 percent by 1990...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 1 2010-10-01 2010-10-01 false Is a Self-Governance Tribe responsible for... SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Roles of Self-Governance Tribe in Establishing and Implementing Construction Project Agreements § 137.350 Is a Self...
Maria L. Sonett
1999-01-01
Integrated surface management techniques for pipeline construction through arid and semi-arid rangeland ecosystems are presented in a case history of a 412-mile pipeline construction project in New Mexico. Planning, implementation and monitoring for restoration of surface hydrology, soil stabilization, soil cover, and plant species succession are discussed. Planning...
Code of Federal Regulations, 2010 CFR
2010-10-01
... contract will require the construction of a multi-story office building, the prospective bidder/offeror..., etc.) Complexity: (office building, etc.) Type of construction: Value of project: If the prospective... (P.L. 99-399; 22 U.S.C. 4852). The Act limits certain construction projects abroad to United States...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 42 Public Health 1 2012-10-01 2012-10-01 false What other alternatives are available for Self... SERVICES TRIBAL SELF-GOVERNANCE Construction Purpose and Scope § 137.272 What other alternatives are available for Self-Governance Tribes to perform construction projects? Self-Governance Tribes also have the...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 42 Public Health 1 2011-10-01 2011-10-01 false What other alternatives are available for Self... SERVICES TRIBAL SELF-GOVERNANCE Construction Purpose and Scope § 137.272 What other alternatives are available for Self-Governance Tribes to perform construction projects? Self-Governance Tribes also have the...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 42 Public Health 1 2013-10-01 2013-10-01 false What other alternatives are available for Self... SERVICES TRIBAL SELF-GOVERNANCE Construction Purpose and Scope § 137.272 What other alternatives are available for Self-Governance Tribes to perform construction projects? Self-Governance Tribes also have the...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 42 Public Health 1 2014-10-01 2014-10-01 false What other alternatives are available for Self... SERVICES TRIBAL SELF-GOVERNANCE Construction Purpose and Scope § 137.272 What other alternatives are available for Self-Governance Tribes to perform construction projects? Self-Governance Tribes also have the...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 1 2010-10-01 2010-10-01 false What other alternatives are available for Self... SERVICES TRIBAL SELF-GOVERNANCE Construction Purpose and Scope § 137.272 What other alternatives are available for Self-Governance Tribes to perform construction projects? Self-Governance Tribes also have the...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Willenbrock, J.H.; Thomas, H.R. Jr.; Burati, J.J. Jr.
1978-12-01
A summary of two reports, COO/4120-1 and COO/4120-2, is given. A comparative analysis was made of the Quality Assurance practices related to the structural concrete phase on nine nuclear and three fossil fuel power plant projects which are (or have been) under construction in the United States in the past ten years. For the nuclear projects the analysis identified the response of each Quality Assurance program to the applicable criteria of 10 CFR Part 50, Appendix B as well as to the pertinent regulatory requirements and industry standards. For the fossil projects the analysis identified the response of each Qualitymore » Assurance program to criteria similar to those which were applicable in the nuclear situation. The major emphasis was placed on the construction aspects of the structural concrete phase of each project. The engineering and design aspects were examined whenever they interfaced with the construction aspects.« less
Categorization of potential project cost overrun factors in construction industry
NASA Astrophysics Data System (ADS)
Karunakaran, P.; Abdullah, A. H.; Nagapan, S.; Sohu, S.; Kasvar, K. K.
2018-04-01
Cost overrun has been severely hit down the economy and reputations for many construction industry around the world. Many project management tools developed to control the budget of a project. However, the cost management is still considered poor as there are many cost overrun issues occurred in the construction industry. Thus, this paper aims to identify and cluster the potential construction project cost overrun factors according to their originating groups using the thematic approach. Basically, through literature review, all the potential factors that may cause cost overrun were screened thoroughly before they were clustered into seven (7) groups of the originating factors, namely project, contract, client, contractor, consultant, labour and external. Each potential factor was explained clearly with some examples based on the Malaysian case studies to illustrate the cost overrun scenario. These findings may aid in the future to highlight on how to mitigate the critical potential factors of cost overrun to reduce or overcome its impact on all the stakeholders involved.
Puget Sound Tidal Energy In-Water Testing and Development Project Final Technical Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Collar, Craig W
2012-11-16
Tidal energy represents potential for the generation of renewable, emission free, environmentally benign, and cost effective energy from tidal flows. A successful tidal energy demonstration project in Puget Sound, Washington may enable significant commercial development resulting in important benefits for the northwest region and the nation. This project promoted the United States Department of Energy's Wind and Hydropower Technologies Program's goals of advancing the commercial viability, cost-competitiveness, and market acceptance of marine hydrokinetic systems. The objective of the Puget Sound Tidal Energy Demonstration Project is to conduct in-water testing and evaluation of tidal energy technology as a first step towardmore » potential construction of a commercial-scale tidal energy power plant. The specific goal of the project phase covered by this award was to conduct all activities necessary to complete engineering design and obtain construction approvals for a pilot demonstration plant in the Admiralty Inlet region of the Puget Sound. Public Utility District No. 1 of Snohomish County (The District) accomplished the objectives of this award through four tasks: Detailed Admiralty Inlet Site Studies, Plant Design and Construction Planning, Environmental and Regulatory Activities, and Management and Reporting. Pre-Installation studies completed under this award provided invaluable data used for site selection, environmental evaluation and permitting, plant design, and construction planning. However, these data gathering efforts are not only important to the Admiralty Inlet pilot project. Lessons learned, in particular environmental data gathering methods, can be applied to future tidal energy projects in the United States and other parts of the world. The District collaborated extensively with project stakeholders to complete the tasks for this award. This included Federal, State, and local government agencies, tribal governments, environmental groups, and others. All required permit and license applications were completed and submitted under this award, including a Final License Application for a pilot hydrokinetic license from the Federal Energy Regulatory Commission. The tasks described above have brought the project through all necessary requirements to construct a tidal pilot project in Admiralty Inlet with the exception of final permit and license approvals, and the selection of a general contractor to perform project construction.« less
Genetically engineered multivalent single chain antibody constructs for cancer therapy
DOE Office of Scientific and Technical Information (OSTI.GOV)
Surinder Batra, Ph D
2006-02-27
Current therapeutic approaches against the advanced stages of human solid tumors are palliative rather than curative. Many modalities, including, surgery, radiation, and chemotherapy, either alone or in combination have met with only modest success for advanced metastatic cancers. Radioimmunotherapy (RIT) combines the specificity of monoclonal antibodies with cytotxic effects of radioisotopes. It is the smart way of delivering radiation to the known and occult metastatic cancer cells and is independent of drug toxicity and/or hormone resistance. The tumor associated glycoprotein-72 (TAG-72) containing the unique disaccharide sialyl-Tn, is highly expressed in majority of adenocarcinomas, including carcinomas of the prostate, breast, ovaries,more » pancreas and colon (80-90%) compared to undetectable expression in normal tissues. Monoclonal antibody CC49, reactive with TAG-72, after conjugation to potent gamma- and beta-emitting radionuclides, has been useful in selective systemic radiolocalization of disease and therapy of primary and metastatic tumor sites. However, limited therapeutic responses were observed in patients. Limited success of antibody based delivery of radioisotopes can be attributed to several factors including undesirable pharmacokinetics, poor tumor uptake and high immunogenicity of intact antibodies (IgGs). The primary factors contributing towards the failure of RIT include: 1) longer serum half-lives of the intact IgG molecules resulting in the radiotoxicity, 2) generation of human antibodies against murine antibodies (HAMA) that limits the frequency of dose administration, 3) poor diffusion rates of intact IgG due to the large size and 4) high interstitial fluid pressures (IFP) encountered in solid tumors. The major goal of our multidisciplinary project was to develop specific novel radiopharmaceuticals, with desired pharmacokinetics, for the diagnosis and therapy of solid tumors. To overcome the low uptake of radioactivity by tumors and to increase its tumor: normal tissue ratio for improved therapeutic index, we engineered a variety antibody constructs. These constructs were evaluated using novel approaches like special radionuclides, pretargeting and optimization. Due to the smaller size, the engineered antibody molecules should penetrate better throughout a tumor mass, with less dose heterogeneity, than is the case with intact IgG. Multivalent scFvs with an appropriate radionuclide, therefore, hold promising prospects for cancer therapy and clinical imaging in MAb-based radiopharmaceuticals. In addition, the human anti-mouse antibodies (HAMA) responses in patients against antibody-based therapy are usually directed against the immunoglobulin constant regions; however, anti-idiotypic responses can also be detected. The HAMA responses reduce the efficacy of treatment by removing the circulating antibody molecules, fragments, and possibly scFvs by altering the pharmacokinetic properties of the antibody. HAMA responses against divalent IgG, divalent Ig fragments, and possibly multimeric scFvs could cause immune complex formation with hypersensitivity or allergic reactions that could be harmful to patients. The use of small molecules, such as scFvs (monomeric as well as multimeric), with their shorter biological half-lives and the lack of the constant regions and humanized variable (binding regions) performed in our studies should reduce the development of HAMA. The generation of humanized and fully human scFvs should further reduce the development of HAMA. Specific accomplishments on the project are the production of large amounts of recombinant antibodies as they are required in large amounts for cancer diagnosis and therapy. A variety of single-chain Fv (scFv) constructs were engineered for the desired pharmacokinetic properties. Tetrameric and dimeric scFvs showed a two-fold advantage: (1) there was a considerable gain in avidity as compared to smaller fragments, and (2) the biological half-life was more compatible with RIT and RIS requirements. For RIT, delivery for sc(Fv)2 and [sc(Fv)2]2 in a fractionated schedule clearly presented a therapeutic advantage over single administration. The treatment group receiving tetravalent scFv showed a statistically significant prolonged survival with both single and fractionated administrations. 99mTc-labeled multivalent scFvs show good tumor targeting characteristics with high radiolocalization indices (tumor:background ratio). Macroautoradiography performed at 6 and 16 h post administration of labeled 99mTc-sc(Fv)2 and 99mTc-[sc(Fv)2] clearly detected the tumors in mice. Huamnaized scFs showed decreased immunogencity with patient sera.« less
Reducing construction waste: A study of urban infrastructure projects.
de Magalhães, Ruane Fernandes; Danilevicz, Ângela de Moura Ferreira; Saurin, Tarcisio Abreu
2017-09-01
The construction industry is well-known for producing waste detrimental to the environment, and its impacts have increased with the development process of cities. Although there are several studies focused on the environmental impact of residential and commercial buildings, less knowledge is available regarding decreasing construction waste (CW) generation in urban infrastructure projects. This study presents best practices to reduce waste in the said projects, stressing the role of decision-making in the design stage and the effective management of construction processes in public sector. The best practices were identified from literature review, document analysis in 14 projects of urban infrastructure, and both qualitative and quantitative survey with 18 experts (architects and engineers) playing different roles on those projects. The contributions of these research are: (i) the identification of the main building techniques related to the urban design typologies analyzed; (ii) the identification of cause-effect relationships between the design choices and the CW generation diagnosis; (iii) the proposal of a checklist to support the decision-making process, that can be used as a control and evaluation instrument when developing urban infrastructure designs, focused on the construction waste minimization (CWM). Copyright © 2017 Elsevier Ltd. All rights reserved.
Forecast Inaccuracies in Power Plant Projects From Project Managers' Perspectives
NASA Astrophysics Data System (ADS)
Sanabria, Orlando
Guided by organizational theory, this phenomenological study explored the factors affecting forecast preparation and inaccuracies during the construction of fossil fuel-fired power plants in the United States. Forecast inaccuracies can create financial stress and uncertain profits during the project construction phase. A combination of purposeful and snowball sampling supported the selection of participants. Twenty project managers with over 15 years of experience in power generation and project experience across the United States were interviewed within a 2-month period. From the inductive codification and descriptive analysis, 5 themes emerged: (a) project monitoring, (b) cost control, (c) management review frequency, (d) factors to achieve a precise forecast, and (e) factors causing forecast inaccuracies. The findings of the study showed the factors necessary to achieve a precise forecast includes a detailed project schedule, accurate labor cost estimates, monthly project reviews and risk assessment, and proper utilization of accounting systems to monitor costs. The primary factors reported as causing forecast inaccuracies were cost overruns by subcontractors, scope gaps, labor cost and availability of labor, and equipment and material cost. Results of this study could improve planning accuracy and the effective use of resources during construction of power plants. The study results could contribute to social change by providing a framework to project managers to lessen forecast inaccuracies, and promote construction of power plants that will generate employment opportunities and economic development.
Lamey, M; Carlone, M; Alasti, H; Bissonnette, J P; Borg, J; Breen, S; Coolens, C; Heaton, R; Islam, M; van Proojen, M; Sharpe, M; Stanescu, T; Jaffray, D
2012-07-01
An online Magnetic Resonance guided Radiation Therapy (MRgRT) system is under development. The system is comprised of an MRI with the capability of travel between and into HDR brachytherapy and external beam radiation therapy vaults. The system will provide on-line MR images immediately prior to radiation therapy. The MR images will be registered to a planning image and used for image guidance. With the intention of system safety we have performed a failure modes and effects analysis. A process tree of the facility function was developed. Using the process tree as well as an initial design of the facility as guidelines possible failure modes were identified, for each of these failure modes root causes were identified. For each possible failure the assignment of severity, detectability and occurrence scores was performed. Finally suggestions were developed to reduce the possibility of an event. The process tree consists of nine main inputs and each of these main inputs consisted of 5 - 10 sub inputs and tertiary inputs were also defined. The process tree ensures that the overall safety of the system has been considered. Several possible failure modes were identified and were relevant to the design, construction, commissioning and operating phases of the facility. The utility of the analysis can be seen in that it has spawned projects prior to installation and has lead to suggestions in the design of the facility. © 2012 American Association of Physicists in Medicine.
Fertilizer effects on attaining vegetation requirements.
DOT National Transportation Integrated Search
2014-02-01
This project was developed to evaluate the effects of varying the substrate and fertilization regimes on the success of complex warm-season grass and forb seedings on recent roadside construction sites. Re-vegetating construction projects is required...
Three Construction Projects with Wood Scraps
ERIC Educational Resources Information Center
Levine, Elizabeth
1977-01-01
Wood, a natural material, appeals to children of all ages. Wood construction allows children the flexibility of moving parts of their work around until they are satisfied with the arrangement. Three projects are described. (Author/RK)
Evaluation of stainless steel reinforcement construction project
DOT National Transportation Integrated Search
2003-02-01
Stainless steel reinforcement has greater corrosion resistance than that of the conventional reinforcement. In this project, bridge A6059, the first in Missouri utilizing stainless steel reinforcement in the deck, was constructed, along with bridge A...
Risky business. Organizations tackle infection control during construction.
Burmhal, Beth
2003-06-01
Construction projects, no matter how minor, can be dangerous for patients who are especially sensitive to infection. Guidelines from three prominent organizations are finally helping hospitals understand how to prevent infections during those projects.
Konz, M
2006-01-01
Our research, focussed on art therapy with primary school children, guided us to the footsteps of women pioneers in the research about children's psyche, like Anna Freud, Melanie Klein, Margaret Loewenfeld, Dora Kalff. We have been inspired by their very personal but nevertheless somehow similar type of research, to work with the children in a blue sand pit, where they could construct and play their personal fairy tales. Thus they share with us their momentary preoccupations, without being forced to talk about them. They are revealing their internal structures, and are integrating, by narration and projection on those figurines in action, their deficient defense mechanisms as well as their negative tendencies. Based on this approach, we expect that there will by an amelioration of their social skills, an enhancement of their intrinsic motivation, and a diminution of their conduct disorders. The analyze will be done by questionnaires and rating scales constructed especially for this research, as well as by sociograms, with the help of descriptive non parametric statistics.
Earthworks logistics in the high density urban development conditions - case study
NASA Astrophysics Data System (ADS)
Sobotka, A.; Blajer, M.
2017-10-01
Realisation of the construction projects on highly urbanised areas carries many difficulties and logistic problems. Earthworks conducted in such conditions constitute a good example of how important it is to properly plan the works and use the technical means of the logistics infrastructure. The construction processes on the observed construction site, in combination with their external logistics service are a complex system, difficult for mathematical modelling and achievement of appropriate data for planning the works. The paper shows describe and analysis of earthworks during construction of the Centre of Power Engineering of AGH in Krakow for two stages of a construction project. At the planning stage in the preparatory phase (before realization) and in the implementation phase of construction works (foundation). In the first case, an example of the use of queuing theory for prediction of excavation time under random work conditions of the excavator and the associated trucks is provided. In the second case there is a change of foundation works technology resulting as a consequence of changes in logistics earthworks. Observation of the construction has confirmed that the use of appropriate methods of construction works management, and in this case agile management, the time and cost of the project have not been exceeded. The success of a project depends on the ability of the contractor to react quickly when changes occur in the design, technology, environment, etc.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-25
...; NASA Glenn Research Center Plum Brook Station Wind Farm Project AGENCY: National Aeronautics and Space... Environmental Impact Statement (EIS) for the NASA GRC Plum Brook Station Wind Farm Project located near Sandusky... obtain public comments on construction and operation of the wind farm. The purpose of constructing and...
ERIC Educational Resources Information Center
Fjellström, Magnus
2015-01-01
Project-based vocational education and training (PBVET) is a way to conduct vocational education in Swedish construction programmes. The educational settings used include projects ranging from minor construction to advanced houses. Due to limited research on this kind of educational setting, it is important to further develop knowledge on…
40. From Final Construction Report on the Haleakala Road ProjectNR7, ...
40. From Final Construction Report on the Haleakala Road Project--NR-7, Hawaii National Park, Island of Maui, Territory of Hawaii, T.H. GENERAL VIEW OT THE PROJECT SHOWING CONSPICUOUS SCARS. THE BEFORE PHOTO OF A BEFORE AND AFTER SET. AFTER PHOTO IS HI-52-41. - Haleakala National Park Roads, Pukalani, Maui County, HI
Costs Climb on Materials for Schools: Construction Projects Delayed, Scrapped
ERIC Educational Resources Information Center
Sack, Joetta L.
2004-01-01
The rapidly rising cost of steel and other construction materials is forcing some districts that are building new schools to scramble for more money, delay work, or redesign projects. Nationwide, contractors and architects are finding it harder to give accurate estimates on projects, and some have even had to renegotiate contracts with districts.…
Learning Based on the Project Entitled "Design and Construction of a Wooden Bridge"
ERIC Educational Resources Information Center
Barris, Cristina; Torres, Lluís; Simon, Enric
2016-01-01
This article presents the results of a case involving the application of project-based learning carried out with students in the Mechanical Engineering degree program at the University of Girona. The project, entitled "Design and construction of a wooden bridge", was conducted at the Polytechnic School in the third-year Structures…
Mural art therapy for young offenders hospitalised with a mental illness.
George, Oleen; Kasinathan, John
2015-02-01
To describe a mural art therapy project completed within an adolescent unit of a secure forensic psychiatric hospital. The planning, implementation and consecutive stages of the mural art therapy project are described. Pertinent themes are identified. A cohort of adolescent forensic inpatients was engaged in a group therapeutic process involving collaboration, design and the completion of an art mural. The participants generally approved of the project and identified themes of gaining a sense of achievement, empowerment, teamwork, involvement and ownership. The art mural transformed and improved the visual and spatial environment of the Adolescent unit courtyard. Mural art therapy was acceptable to young offenders hospitalised with mental illness, which has relevance for adolescent psychiatric units and youth detention centres. © The Royal Australian and New Zealand College of Psychiatrists 2014.
NASA Astrophysics Data System (ADS)
Halil, F. M.; Nasir, N. M.; Shukur, A. S.; Hashim, H.
2018-02-01
Design and Build construction project involved the biggest scale of the cost of investment as compared to the traditional approach. In Design and Build, the client hires a design professional that will design according to the client’s need and specification. This research aim is to explore the concept of partnering implementation practiced in the design and build procurement approach. Therefore, the selection of design professionals such as Contractors and consultants in the project is crucial to ensure the successful project completion on time, cost, and quality. The methodology adopted using quantitative approach. Administration of the questionnaire was distributed to the public client by using postal survey. Outcomes of the results, the public clients agreed that project management capabilities and commitment to budget as a crucial element of partnering from the design professional in design and build construction project.
NASA Astrophysics Data System (ADS)
Kang, Byung Gyoo; Long, Kaiwen; Zhang, Cheng; Li Hao, Jian
2017-12-01
Ethics is becoming one of the most important requirements for successful business in the 21st century. The construction industry cannot be exceptional from this trend. However construction ethics management requires different approaches from other industries, as the products of the industry are construction projects which are completely different from mass production. Contractors and designers are two major participants in construction projects. The roles and responsibilities of these two project stakeholders decisively influence all aspects of construction project. Practically ethical perceptions of contractors and designers are one of main aspects to be considered for the effective and efficient management of ethics for the construction industry. This research has investigated the ethical perceptions of contractors and designers in the China construction industry. A questionnaire survey which contains 15 ethical issues and 6 demographic factors has been conducted. 170 construction professionals from construction companies and consulting companies have been participated in this survey. These 15 ethical issues are ranked in terms of seriousness, frequency and importance for both contractors and designers as a single group to understand the overall perceptions in the industry. The analysis has also been conducted for contractors and designers respectively to make comparisons between them. The top three serious ethical issues in the industry are ‘Bribery and corruption’, ‘Failure to practice whistle-blowing’ and ‘Improper bidding practices’. Contractors and designers showed similar outcomes for the top five important ethical issues. But for the middle ranged ethical issues, they showed some differences. Further researches are required to identify the causes of the similarity and differences.
Horticulture Therapy Curriculum Development. Final Report.
ERIC Educational Resources Information Center
Taylor, Sally; And Others
This final report includes two major components: a narrative describing a project at Edmonds Community College, Washington, to develop a horticultural therapy curriculum and descriptions of six courses developed or revised during the project. The narrative reports the development of a supplementary interdisciplinary certification program to train…
Impact of System Expansion on Maintenance Resources.
DOT National Transportation Integrated Search
2012-09-01
The basic focus of this research project is developing a marginal maintenance cost mechanism for new construction projects. This mechanism will identify the total expected short-term and long-term maintenance burden required for each construction pro...
Performance monitoring pavements with thermal segregation in Texas.
DOT National Transportation Integrated Search
2012-04-01
This project conducted work to investigate the performance of asphalt surface mixtures that exhibited : thermal segregation during construction. From 2004 to 2009, a total of 14 construction projects were : identified for monitoring. Five of these pr...
AC/CRC adjacent lane surfacing : construction report.
DOT National Transportation Integrated Search
1991-06-01
Asphaltic Concrete (AC) and Portland Cement Concrete (PCC) are common roadway materials used in Oregon. In a recent construction project -- Poverty Flats/Mecham Section -- the Oregon State Highway Division (OSHD) designed, as part of the project, a "...
Railway project design and construction (CEE 411) course updates.
DOT National Transportation Integrated Search
2017-01-20
Course CEE 411 "Railway Project Design and Construction" is a cornerstone of the railway : engineering education program developed by the Rail Transportation and Engineering Center : (RailTEC) at the University of Illinois at Urbana-Champaign (UIUC)....
Settlement Yields Protection for Deerfield River from Highway Project Runoff
Both parties involved in a road and bridge construction project in Deerfield, Mass. have agreed to pay a total penalty of $21,600 to resolve claims by EPA that they violated their construction permit...
38. From Final Construction Report on the Haleakala Road ProjectNR7, ...
38. From Final Construction Report on the Haleakala Road Project--NR-7, Hawaii National Park, Island of Maui, Territory of Hawaii. BRIDGE AT STATION 85+. - Haleakala National Park Roads, Pukalani, Maui County, HI
Interstate 64 traffic response assessment : staff summary.
DOT National Transportation Integrated Search
2009-12-01
An evaluation was conducted of the implemented mobility strategy on the New I-64 : construction project. This construction project will improve more than 10 miles of an : urban Interstate that carries daily traffic volumes approaching 170,000 vehicle...
DOT National Transportation Integrated Search
2006-08-01
The purpose of this Traffic Noise Analysis Protocol for New Highway : Construction, Reconstruction, and Retrofit Barrier Projects (Protocol) is : to present California Department of Transportation (Caltrans) policies and : procedures for applying 23 ...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-29
... construction by SWCD of the proposed Narrows Dam and reservoir, a non-Federal project to be located on... conditions in the affected areas without further development and assumes that irrigation operations would... construction of the 17,000 acre-foot Narrows Dam and reservoir on Gooseberry Creek, pipelines to deliver the...
42 CFR 137.352 - What is contained in a construction project progress report?
Code of Federal Regulations, 2014 CFR
2014-10-01
... 42 Public Health 1 2014-10-01 2014-10-01 false What is contained in a construction project progress report? 137.352 Section 137.352 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Roles of Self-Governance Tribe in...
42 CFR 137.353 - What is contained in a construction project financial report?
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 1 2010-10-01 2010-10-01 false What is contained in a construction project financial report? 137.353 Section 137.353 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Roles of Self-Governance Tribe in...
42 CFR 137.352 - What is contained in a construction project progress report?
Code of Federal Regulations, 2012 CFR
2012-10-01
... 42 Public Health 1 2012-10-01 2012-10-01 false What is contained in a construction project progress report? 137.352 Section 137.352 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Roles of Self-Governance Tribe in...
42 CFR 137.353 - What is contained in a construction project financial report?
Code of Federal Regulations, 2012 CFR
2012-10-01
... 42 Public Health 1 2012-10-01 2012-10-01 false What is contained in a construction project financial report? 137.353 Section 137.353 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Roles of Self-Governance Tribe in...
42 CFR 137.353 - What is contained in a construction project financial report?
Code of Federal Regulations, 2014 CFR
2014-10-01
... 42 Public Health 1 2014-10-01 2014-10-01 false What is contained in a construction project financial report? 137.353 Section 137.353 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Roles of Self-Governance Tribe in...
Bai, Xiao-ping; Zhang, Xi-wei
2013-01-01
Selecting construction schemes of the building engineering project is a complex multiobjective optimization decision process, in which many indexes need to be selected to find the optimum scheme. Aiming at this problem, this paper selects cost, progress, quality, and safety as the four first-order evaluation indexes, uses the quantitative method for the cost index, uses integrated qualitative and quantitative methodologies for progress, quality, and safety indexes, and integrates engineering economics, reliability theories, and information entropy theory to present a new evaluation method for building construction project. Combined with a practical case, this paper also presents detailed computing processes and steps, including selecting all order indexes, establishing the index matrix, computing score values of all order indexes, computing the synthesis score, sorting all selected schemes, and making analysis and decision. Presented method can offer valuable references for risk computing of building construction projects.
Radiology Architecture Project Primer.
Sze, Raymond W; Hogan, Laurie; Teshima, Satoshi; Davidson, Scott
2017-12-19
The rapid pace of technologic advancement and increasing expectations for patient- and family-friendly environments make it common for radiology leaders to be involved in imaging remodel and construction projects. Most radiologists and business directors lack formal training in architectural and construction processes but are expected to play significant and often leading roles in all phases of an imaging construction project. Avoidable mistakes can result in significant increased costs and scheduling delays; knowledgeable participation and communication can result in a final product that enhances staff workflow and morale and improves patient care and experience. This article presents practical guidelines for preparing for and leading a new imaging architectural and construction project. We share principles derived from the radiology and nonradiology literature and our own experience over the past decade completely remodeling a large pediatric radiology department and building a full-service outpatient imaging center. Copyright © 2017 American College of Radiology. Published by Elsevier Inc. All rights reserved.
2015-01-01
Among the recent data mining techniques available, the boosting approach has attracted a great deal of attention because of its effective learning algorithm and strong boundaries in terms of its generalization performance. However, the boosting approach has yet to be used in regression problems within the construction domain, including cost estimations, but has been actively utilized in other domains. Therefore, a boosting regression tree (BRT) is applied to cost estimations at the early stage of a construction project to examine the applicability of the boosting approach to a regression problem within the construction domain. To evaluate the performance of the BRT model, its performance was compared with that of a neural network (NN) model, which has been proven to have a high performance in cost estimation domains. The BRT model has shown results similar to those of NN model using 234 actual cost datasets of a building construction project. In addition, the BRT model can provide additional information such as the importance plot and structure model, which can support estimators in comprehending the decision making process. Consequently, the boosting approach has potential applicability in preliminary cost estimations in a building construction project. PMID:26339227
Shin, Yoonseok
2015-01-01
Among the recent data mining techniques available, the boosting approach has attracted a great deal of attention because of its effective learning algorithm and strong boundaries in terms of its generalization performance. However, the boosting approach has yet to be used in regression problems within the construction domain, including cost estimations, but has been actively utilized in other domains. Therefore, a boosting regression tree (BRT) is applied to cost estimations at the early stage of a construction project to examine the applicability of the boosting approach to a regression problem within the construction domain. To evaluate the performance of the BRT model, its performance was compared with that of a neural network (NN) model, which has been proven to have a high performance in cost estimation domains. The BRT model has shown results similar to those of NN model using 234 actual cost datasets of a building construction project. In addition, the BRT model can provide additional information such as the importance plot and structure model, which can support estimators in comprehending the decision making process. Consequently, the boosting approach has potential applicability in preliminary cost estimations in a building construction project.
Selection of Construction Methods: A Knowledge-Based Approach
Skibniewski, Miroslaw
2013-01-01
The appropriate selection of construction methods to be used during the execution of a construction project is a major determinant of high productivity, but sometimes this selection process is performed without the care and the systematic approach that it deserves, bringing negative consequences. This paper proposes a knowledge management approach that will enable the intelligent use of corporate experience and information and help to improve the selection of construction methods for a project. Then a knowledge-based system to support this decision-making process is proposed and described. To define and design the system, semistructured interviews were conducted within three construction companies with the purpose of studying the way that the method' selection process is carried out in practice and the knowledge associated with it. A prototype of a Construction Methods Knowledge System (CMKS) was developed and then validated with construction industry professionals. As a conclusion, the CMKS was perceived as a valuable tool for construction methods' selection, by helping companies to generate a corporate memory on this issue, reducing the reliance on individual knowledge and also the subjectivity of the decision-making process. The described benefits as provided by the system favor a better performance of construction projects. PMID:24453925
Modeling Manpower and Equipment Productivity in Tall Building Construction Projects
NASA Astrophysics Data System (ADS)
Mudumbai Krishnaswamy, Parthasarathy; Rajiah, Murugasan; Vasan, Ramya
2017-12-01
Tall building construction projects involve two critical resources of manpower and equipment. Their usage, however, widely varies due to several factors affecting their productivity. Currently, no systematic study for estimating and increasing their productivity is available. What is prevalent is the use of empirical data, experience of similar projects and assumptions. As tall building projects are here to stay and increase, to meet the emerging demands in ever shrinking urban spaces, it is imperative to explore ways and means of scientific productivity models for basic construction activities: concrete, reinforcement, formwork, block work and plastering for the input of specific resources in a mixed environment of manpower and equipment usage. Data pertaining to 72 tall building projects in India were collected and analyzed. Then, suitable productivity estimation models were developed using multiple linear regression analysis and validated using independent field data. It is hoped that the models developed in the study will be useful for quantity surveyors, cost engineers and project managers to estimate productivity of resources in tall building projects.
Silber, J H; Fridman, M; DiPaola, R S; Erder, M H; Pauly, M V; Fox, K R
1998-07-01
If patients could be ranked according to their projected need for supportive care therapy, then more efficient and less costly treatment algorithms might be developed. This work reports on the construction of a model of neutropenia, dose reduction, or delay that rank-orders patients according to their need for costly supportive care such as granulocyte growth factors. A case series and consecutive sample of patients treated for breast cancer were studied. Patients had received standard-dose adjuvant chemotherapy for early-stage nonmetastatic breast cancer and were treated by four medical oncologists. Using 95 patients and validated with 80 additional patients, development models were constructed to predict one or more of the following events: neutropenia (absolute neutrophil count [ANC] < or = 250/microL), dose reduction > or = 15% of that scheduled, or treatment delay > or = 7 days. Two approaches to modeling were attempted. The pretreatment approach used only pretreatment predictors such as chemotherapy regimen and radiation history; the conditional approach included, in addition, blood count information obtained in the first cycle of treatment. The pretreatment model was unsuccessful at predicting neutropenia, dose reduction, or delay (c-statistic = 0.63). Conditional models were good predictors of subsequent events after cycle 1 (c-statistic = 0.87 and 0.78 for development and validation samples, respectively). The depth of the first-cycle ANC was an excellent predictor of events in subsequent cycles (P = .0001 to .004). Chemotherapy plus radiation also increased the risk of subsequent events (P = .0011 to .0901). Decline in hemoglobin (HGB) level during the first cycle of therapy was a significant predictor of events in the development study (P = .0074 and .0015), and although the trend was similar in the validation study, HGB decline failed to reach statistical significance. It is possible to rank patients according to their need of supportive care based on blood counts observed in the first cycle of therapy. Such rankings may aid in the choice of appropriate supportive care for patients with early-stage breast cancer.
Construction safety monitoring based on the project's characteristic with fuzzy logic approach
NASA Astrophysics Data System (ADS)
Winanda, Lila Ayu Ratna; Adi, Trijoko Wahyu; Anwar, Nadjadji; Wahyuni, Febriana Santi
2017-11-01
Construction workers accident is the highest number compared with other industries and falls are the main cause of fatal and serious injuries in high rise projects. Generally, construction workers accidents are caused by unsafe act and unsafe condition that can occur separately or together, thus a safety monitoring system based on influencing factors is needed to achieve zero accident in construction industry. The dynamic characteristic in construction causes high mobility for workers while doing the task, so it requires a continuously monitoring system to detect unsafe condition and to protect workers from potential hazards. In accordance with the unique nature of project, fuzzy logic approach is one of the appropriate methods for workers safety monitoring on site. In this study, the focus of discussion is based on the characteristic of construction projects in analyzing "potential hazard" and the "protection planning" to be used in accident prevention. The data have been collected from literature review, expert opinion and institution of safety and health. This data used to determine hazard identification. Then, an application model is created using Delphi programming. The process in fuzzy is divided into fuzzification, inference and defuzzification, according to the data collection. Then, the input and final output data are given back to the expert for assessment as a validation of application model. The result of the study showed that the potential hazard of construction workers accident could be analysed based on characteristic of project and protection system on site and fuzzy logic approach can be used for construction workers accident analysis. Based on case study and the feedback assessment from expert, it showed that the application model can be used as one of the safety monitoring tools.
Hatipkarasulu, Yilmaz; Gill, James H
2004-04-01
The increasing number of companies providing internet services and auction tools helped popularize the online reverse auction trend for purchasing commodities and services in the last decade. As a result, a number of owners, both public and private, accepted the online reverse auctions as the bidding technique for their construction projects. Owners, while trying to minimize their costs for construction projects, are also required to address their ethical responsibilities to the shareholders. In the case of online reverse auctions for construction projects, the ethical issues involved in the bidding technique directly reflects on the owner's ethical and social responsibilities to their shareholders. The goal of this paper is to identify the shareholder ethics and responsibilities in online reverse auctions for construction projects by analyzing the ethical issues for the parties involved in the process. The identification of the ethical issues and responsibilities requires clear definition and understanding of professional ethics and the roles of the involved parties. In this paper, first, the concept of professional ethics and social responsibility is described in a general form. To illustrate the ethical issues and responsibilities, a sample case of bidding for a construction project using online reverse auction techniques is presented in which the shareholders were actively involved in questioning the ethical issues. The issues involved in the bidding process and their reflection on the shareholder responsibilities are described and analyzed for each stage of the process. A brief discussion of the overall process is also included to address the general ethical issues involved in online reverse auctions.
1991 survey of recent health sciences library building projects.
Ludwig, L T
1992-01-01
Twenty health sciences libraries reported building planning, expansion, or construction of new facilities in the association's second annual survey of recent building projects. Six projects are new, freestanding structures in which the library occupies all or a major portion of the space. Six other projects are part of new construction for separately administered units in which the library is a major tenant. The final eight projects involve additions to or renovations of existing space. Seven of these twenty libraries were still in projected, predesign, or design stages of awaiting funding approval; of those seven, five were not prepared to release the requested information. Six projects are reported here as illustrative of current building projects. Images PMID:1600420
Quality of Construction Central Artery / Third Harbor Tunnel Federal Highway Administration Region 1
DOT National Transportation Integrated Search
1996-12-19
The objective of this audit was to evaluate the Federal Highway : Administration's (FHWA) oversight of the Central Artery / Third Harbor Tunnel : Project's (Project) testing procedures to ensure construction was completed in : accordance with applica...
DOT National Transportation Integrated Search
2012-06-01
The Federal Highway Administration (FHWA) has encouraged state transportation agencies (STAs) to implement Incentive/Disincentive (I/D) contracting provisions for early project completion to minimize traffic disruption during highway construction. Th...
7 CFR 4280.161 - Direct Loan Process.
Code of Federal Regulations, 2011 CFR
2011-01-01
... RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE LOANS AND GRANTS Renewable Energy Systems and Energy... available for direct loans; (2) Applicant and project eligibility criteria; (3) Minimum and maximum loan...; (11) Construction planning and performing development; (12) Requirements after project construction...
Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects
DOT National Transportation Integrated Search
1996-01-01
These standard specifications were issued primarily for constructing roads and bridges on Federal Highway projects under the direct administration of the Federal Highway Administration. These specifications are cited as "FP-96" indicating Standard Sp...
Research notes : exploratory study of hot-in-place recycling of asphalt pavements.
DOT National Transportation Integrated Search
1995-06-01
In 1992, the Oregon Department of Transportation (ODOT) contracted for six hot in-place recycling (HIR) projects for rehabilitation of asphalt concrete pavements. Five projects were constructed in 1992; the sixth was constructed in 1993.
42 CFR 137.344 - May a Self-Governance Tribe reallocate funds among construction project agreements?
Code of Federal Regulations, 2010 CFR
2010-10-01
... HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES TRIBAL SELF... construction project agreements to the extent not prohibited by applicable appropriation law(s). Roles of Self...
Code of Federal Regulations, 2011 CFR
2011-04-01
... 23 Highways 1 2011-04-01 2011-04-01 false After a bridge project has been completed (either PE or... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.41 After a bridge project has been completed (either PE or construction) what happens with...
ERIC Educational Resources Information Center
South Carolina State Library, Columbia.
Supporting documentation for the grant and use of Federal Library Services and Construction Act (LSCA) funds in South Carolina is presented in this annual program. Under Title I, Library Services, the bulk of the grant money is planned for the following projects: (1) general administration (Project I-A); (2) library interpretation (Project I-B);…
Code of Federal Regulations, 2011 CFR
2011-10-01
... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Who will hold title to a rural water project that is constructed following the completion of an appraisal investigation or feasibility study... appraisal investigation or feasibility study under this program? Title to any rural water project planned...
Constructive Convergence: Imagery and Humanitarian Assistance
2012-02-01
PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES...a dataset different projection , a transformation must be performed on the data that warps the original data into the new projection . Every time data...i Constructive Convergence: Imagery and Humanitarian Assistance Doug Hanchard Center for Technology and National
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-14
... Respondents: C-700 = 4,500 C-700(R) = 2,000 C-700(SL) = 12,500 C-700(F) = 2,000 TOTAL = 21,000 Estimated Time... collection for forms C-700, Private Construction Projects; C-700(R), Multifamily Residential Projects; C-700... nonresidential projects owned by private companies or individuals. The Form C-700(R), Multifamily Residential...
ERIC Educational Resources Information Center
Menassa, Carol Chukri
2009-01-01
A project-specific dispute resolution ladder (DRL) typically consists of multiple alternative dispute resolution (ADR) techniques that are chosen to assist in mitigating the impact of change orders and claims (CCO) occurring during the project construction phase, and avoid their escalation to protracted disputes that adversely affect a…
Code of Federal Regulations, 2010 CFR
2010-04-01
... 23 Highways 1 2010-04-01 2010-04-01 false After a bridge project has been completed (either PE or... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.41 After a bridge project has been completed (either PE or construction) what happens with...
Research Progress of Building Materials Used in Construction Land
NASA Astrophysics Data System (ADS)
Niu, Yan
2018-01-01
Construction land preparation is an important aspect of land remediation project. The research of materials in the process of land improvement is the foundation and the core. Therefore, it is necessary to study the materials that may be involved in the process of building land preparation. In this paper, the research on the construction materials such as recycled concrete, geosynthetics, soil stabilizers, soil improvers, building insulation materials and inorganic fibrous insulation materials, which are commonly used in construction sites, is reviewed and discussed in this paper. Land remediation project involved in the construction of land materials to provide reference.
Sahin, Sükran; Kurum, Ekrem
2009-09-01
Ecological monitoring is a complementary component of the overall environmental management and monitoring program of any Environmental Impact Assessment (EIA) report. The monitoring method should be developed for each project phase and allow for periodic reporting and assessment of compliance with the environmental conditions and requirements of the EIA. Also, this method should incorporate a variance request program since site-specific conditions can affect construction on a daily basis and require time-critical application of alternative construction scenarios or environmental management methods integrated with alternative mitigation measures. Finally, taking full advantage of the latest information and communication technologies can enhance the quality of, and public involvement in, the environmental management program. In this paper, a landscape-scale ecological monitoring method for major construction projects is described using, as a basis, 20 months of experience on the Baku-Tbilisi-Ceyhan (BTC) Crude Oil Pipeline Project, covering Turkish Sections Lot B and Lot C. This analysis presents suggestions for improving ecological monitoring for major construction activities.
Space construction system analysis study: Project systems and missions descriptions
NASA Technical Reports Server (NTRS)
1979-01-01
Three project systems are defined and summarized. The systems are: (1) a Solar Power Satellite (SPS) Development Flight Test Vehicle configured for fabrication and compatible with solar electric propulsion orbit transfer; (2) an Advanced Communications Platform configured for space fabrication and compatible with low thrust chemical orbit transfer propulsion; and (3) the same Platform, configured to be space erectable but still compatible with low thrust chemical orbit transfer propulsion. These project systems are intended to serve as configuration models for use in detailed analyses of space construction techniques and processes. They represent feasible concepts for real projects; real in the sense that they are realistic contenders on the list of candidate missions currently projected for the national space program. Thus, they represent reasonable configurations upon which to base early studies of alternative space construction processes.
Using Project Management Systems at the Construction Field Office
1989-03-01
instrumentation 13550 transportation control instrumentation 13600 solor energy systems 13700 wind energy systems 13800 building automation systems ...Engineering Research Laboratory AD-A207 077 Using Project Management Systems at the Construction Field Office by E. William East Jeffrey G. Kirby Automated...automated systems available, engineers at the construction fieid office (or resident office) are faced with the over- whelming task of choosing which
Hotel Thayer, U.S. Military Academy, West Point, New York
1994-09-27
successfully used for three previous hotel construction projects at Fort Bliss, Texas; Fort Drum, New York; and Schofield Barracks, Hawaii. The Army...performance and payment bonds were to cover costs of default during hotel construction and renovation. However, neither the default reserve nor the...privatization. The Army stated that credit enhancement (loan guarantee) has been successfully used for three previous hotel construction projects at Fort
Muratalina, Aigul; Smith-Palmer, Jayne; Nurbekova, Akmaral; Abduakhassova, Gulmira; Zhubandykova, Leila; Roze, Stéphane; Karamalis, Manolis; Shamshatova, Gulzhakhan; Demessinov, Adi; D'Agostino, Nicola Dunne; Lynch, Peter; Yedigarova, Larisa; Klots, Motty; Valentine, William; Welsh, John; Kaufman, Francine
2015-09-01
Diabetes is a key driver in the rise of noncommunicable diseases globally. It causes expensive and burdensome short- and long-term complications, with both an economic and social impact. In many countries, however, access to care and disease management in type 1 diabetes is suboptimal, increasing the risk for complications. In 2011, Project Baiterek was initiated as a collaborative effort between the Kazakhstan Ministry of Health, industry (Medtronic Plc), local physicians, and the Diabetes Association of the Republic of Kazakhstan to enhance patient access to continuous subcutaneous insulin infusion (CSII) therapy. It was the first countrywide project to provide equity and universal access to insulin pump therapy among children with type 1 diabetes, increasing pump use from zero to two-thirds of this population in less than 3 years. The project also involved instigating longitudinal data collection, and long-term clinical outcomes continue to be monitored. Here, we provide an overview of the clinical, quality-of-life, and economic outcomes to date associated with providing CSII therapy to children with type 1 diabetes in Kazakhstan. Initial clinical data show that CSII therapy improved clinical outcomes and quality of life for patients entered into the program and that CSII therapy was cost-effective relative to multiple daily injection therapy. The positive outcomes of Project Baiterek provide a template for similar patient access programs in other settings, and its framework could be adapted to initiatives to change health care infrastructures and standards of care for other noncommunicable diseases. Copyright © 2015. Published by Elsevier Inc.
[Receptive music therapy with persons suffering from a physical handicap].
Scholer, M
2010-01-01
Music therapy, as a part of arts therapies, is used as a therapeutical tool for restoring, maintaining and improving the mental, physical and emotional health of human beings. The main mission of receptive music therapy is not found on the performance level, but on the level of attentive and intimate music listening that is not passive at all, contributing to musical pleasure and to wellbeing. At first we introduce the basic vocabulary used in receptive music therapy, flow experience and the main dimensions (bio-psycho-social) influenced by stimulating music listening. We also present the aims of this psycho-pedagogical project: The focus lies on determining the sensitivity of physically handicapped persons to different music stimuli (music styles). In this case, we can talk of the degree of music reception. We worked in an institution for persons suffering from a physical handicap. The applied methodology is based on the psycho-musical survey by Verdeau-Paillès (1). This psychological record consists in a basic interview and a test of music listening performances leading to the construction of a summary graph and the final receptivity psychogram. An observational frame conceived by Schiltz (2) and adapted to the actual situation offers the possibility of making exact observations as to non-verbal and verbal variables during the therapeutical sessions. Thus, we can present the results of descriptive and non-parametric statistical procedures, but also the results of case studies. The statistical tests used were Wilcoxon's sign-rank test for a pre-post comparison of variables related to non-verbal and verbal behaviour (two different sessions of music therapy with similar contents) and Spearman's Rho which permitted us to compute the correlations between non-verbal expression and verbal communication (N=14). Finally we conclude that our patients considered their musical experience as very positive. The results of the personal interview and the psycho-musical survey brought about several interesting statistical findings on how receptive music therapy physically and psychologically influenced the patients.
NASA Astrophysics Data System (ADS)
Zhadanovsky, Boris; Sinenko, Sergey
2018-03-01
Economic indicators of construction work, particularly in high-rise construction, are directly related to the choice of optimal number of machines. The shortage of machinery makes it impossible to complete the construction & installation work on scheduled time. Rates of performance of construction & installation works and labor productivity during high-rise construction largely depend on the degree of provision of construction project with machines (level of work mechanization). During calculation of the need for machines in construction projects, it is necessary to ensure that work is completed on scheduled time, increased level of complex mechanization, increased productivity and reduction of manual work, and improved usage and maintenance of machine fleet. The selection of machines and determination of their numbers should be carried out by using formulas presented in this work.
Development of NIRS pencil beam scanning system for carbon ion radiotherapy
NASA Astrophysics Data System (ADS)
Furukawa, T.; Hara, Y.; Mizushima, K.; Saotome, N.; Tansho, R.; Saraya, Y.; Inaniwa, T.; Mori, S.; Iwata, Y.; Shirai, T.; Noda, K.
2017-09-01
At Heavy Ion Medical Accelerator in Chiba (HIMAC) in National Institute of Radiological Sciences (NIRS), more than 9000 patients have been successfully treated by carbon ion beams since 1994. The successful results of treatments have led us to construct a new treatment facility equipped with a three-dimensional pencil beam scanning irradiation system, which is one of sophisticated techniques for cancer therapy with high energetic ion beam. This new facility comprises two treatment rooms having fixed beam lines and one treatment room having rotating gantry line. The challenge of this project is to realize treatment of a moving target by scanning irradiation. Thus, to realize this, the development of the fast scanning system is one of the most important issues in this project. After intense commissioning and quality assurance tests, the treatment with scanned ion beam was started in May 2011. After treatment of static target starts, we have developed related technologies. As a result, we can start treatment of moving target and treatment without range shifter plates since 2015. In this paper, the developments of the scanning irradiation system are described.
Promoting the Role of Occupational Therapy in School-Based Collaboration: Outcome Project
ERIC Educational Resources Information Center
Christner, Andrea
2015-01-01
This evidence-based project provided a professional development opportunity for educators to enhance the awareness of school-based occupational therapy and promote a collaborative approach when supporting student participation in daily learning tasks. Through asynchronous web-based delivery, participants viewed five narrated PowerPoint…
Identification of a Core Curriculum in Gerontology for Allied Health Professionals. Final Report.
ERIC Educational Resources Information Center
Hedl, John J.; And Others
The overall goal of this project was to identify a core curriculum in gerontology for seven allied health professions (radiologic technologist, radiation therapist, respiratory therapist, dental hygienist, dental assistant, physical therapy assistant, and occupational therapy assistant). The project also identified the current state of gerontology…
Applying the Helper-Therapy Principle: A Children-Teach-Children Project
ERIC Educational Resources Information Center
Weiner, Anita; And Others
1974-01-01
The 'perpetual client syndrome' can be combated by programs designed to change the role of the constant receiver of help to that of the giver of help. A project conducted in an Israeli public school indicates the benefits of a helper-therapy program, and some of the problems. (Author)
Research notes : soil nailing of a bridge fill embankment.
DOT National Transportation Integrated Search
1991-11-01
A recent construction project involved widening and lowering the grade of the Swift Highway under the south end of the Oregon Slough Bridge approximately seven miles north of Portland. This project included construction of the first permanent soil na...
ERIC Educational Resources Information Center
Clary, Renee; Wandersee, James
2014-01-01
Renee Clary and James Wandersee implemented the Stratigraphy and Data Interpretation Project described in this article when they recognized that some students were having difficulties constructing appropriate graphics and interpreting their constructed graphics for an earlier mathematics-science project in their classrooms. They also previously…
DOT National Transportation Integrated Search
2013-08-01
This research aimed to evaluate the data requirements for computer assisted construction planning : and staging methods that can be implemented in pavement rehabilitation projects in the state of : Georgia. Results showed that two main issues for the...
Artificial Reefs--A Coastal Classroom Project.
ERIC Educational Resources Information Center
Dindo, John J.
1986-01-01
Discusses the construction of artificial reefs for such uses as commercial fishing and recreational boating. Describes a class project in which students construct a small artificial reef and observe the changes over time in terms of temperature, salinity, flora and fauna. (TW)
77 FR 29537 - Community Facility Loans
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-18
... alternate contracting method projects must comply with the requirements for ``maximum open and free... of alternate construction contract methods (such as Design/Build and Construction Management) by the.... Further, these changes will give all applicants greater flexibility in developing projects. Therefore, a...
7 CFR 3015.115 - Budget revisions.
Code of Federal Regulations, 2012 CFR
2012-01-01
... allocable indirect costs and result in a claim for a supplementary award. (2) Any or all of the prior...) Construction projects. Unless provided otherwise by the terms of the grant, subgrant, or cooperative agreement, revisions to construction project budgets do not require approval. ...
7 CFR 3015.115 - Budget revisions.
Code of Federal Regulations, 2013 CFR
2013-01-01
... allocable indirect costs and result in a claim for a supplementary award. (2) Any or all of the prior...) Construction projects. Unless provided otherwise by the terms of the grant, subgrant, or cooperative agreement, revisions to construction project budgets do not require approval. ...
7 CFR 3015.115 - Budget revisions.
Code of Federal Regulations, 2011 CFR
2011-01-01
... allocable indirect costs and result in a claim for a supplementary award. (2) Any or all of the prior...) Construction projects. Unless provided otherwise by the terms of the grant, subgrant, or cooperative agreement, revisions to construction project budgets do not require approval. ...
7 CFR 3015.115 - Budget revisions.
Code of Federal Regulations, 2014 CFR
2014-01-01
... allocable indirect costs and result in a claim for a supplementary award. (2) Any or all of the prior...) Construction projects. Unless provided otherwise by the terms of the grant, subgrant, or cooperative agreement, revisions to construction project budgets do not require approval. ...
Basic Metal Plate Jewelry Construction.
ERIC Educational Resources Information Center
Petersen, Hugh
2003-01-01
Describes how to do an art project with middle school students in which they learn about jewelry making. Explains that the students did not use soldering stations. Discusses the tools used in the project and how the students learned about jewelry construction. (CMK)
35. From Final Construction Report on the Haleakala Road ProjectNR7, ...
35. From Final Construction Report on the Haleakala Road Project--NR-7, Hawaii National Park, Island of Maui, Territory of Hawaii. LOOKING BACK FROM STATION 335 AT RETURN CURVE. - Haleakala National Park Roads, Pukalani, Maui County, HI
36. From Final Construction Report on the Haleakala Road ProjectNR7, ...
36. From Final Construction Report on the Haleakala Road Project--NR-7, Hawaii National Park, Island of Maui, Territory of Hawaii. TYPICAL RUBBLE MASONRY HEADWALL AND BOX CULVERT. - Haleakala National Park Roads, Pukalani, Maui County, HI
Power Authority calls for wise investment in hydropower
DOE Office of Scientific and Technical Information (OSTI.GOV)
Yould, E.P.
Wise investment in hydropower is one of the most valuable long-term economic actions the state of Alaska can take. A review of the hydro projects shows that investigations needed for construction of the Susitna hydroelectric project will be initiated, while Green Lake and Solomon Gulch projects at Sitka and Valdez will enter their second construction season. Swan Lake and Terror Lake hydropower construction for Ketchikan and Kodiak will also be initiated in 1980 followed by Tyee Lake hydropower for Petersburg and Wrangell. Projects still under investigation which may prove feasible for construction in the future are at Cordova, Homer, Seward,more » Bristol Bay, the Tlingit-Haida area, the lower Kuskokwim and Yukon area, and at some smaller rural communities. Other communities may be able to develop wood or peat fueled generation, wile still others might be able to develop small tidal or wind power generation. The Alaska Power Authority is attempting to expedite these projects, and the end result should be a significant degree of electrical energy independence by the end of the next decade.« less
Methodology for quantification of waste generated in Spanish railway construction works.
de Guzmán Báez, Ana; Villoria Sáez, Paola; del Río Merino, Mercedes; García Navarro, Justo
2012-05-01
In the last years, the European Union (EU) has been focused on the reduction of construction and demolition (C&D) waste. Specifically, in 2006, Spain generated roughly 47million tons of C&D waste, of which only 13.6% was recycled. This situation has lead to the drawing up of many regulations on C&D waste during the past years forcing EU countries to include new measures for waste prevention and recycling. Among these measures, the mandatory obligation to quantify the C&D waste expected to be originated during a construction project is mandated. However, limited data is available on civil engineering projects. Therefore, the aim of this research study is to improve C&D waste management in railway projects, by developing a model for C&D waste quantification. For this purpose, we develop two equations which estimate in advance the amount, both in weight and volume, of the C&D waste likely to be generated in railway construction projects, including the category of C&D waste generated for the entire project. Copyright © 2012 Elsevier Ltd. All rights reserved.
Yu, Shih-Heng; Chang, Dong-Shang
2014-01-01
This study investigates the risk factors in railway reconstruction project through complete literature reviews on construction project risks and scrutinizing experiences and challenges of railway reconstructions in Taiwan. Based on the identified risk factors, an assessing framework based on the fuzzy multicriteria decision-making (fuzzy MCDM) approach to help construction agencies build awareness of the critical risk factors on the execution of railway reconstruction project, measure the impact and occurrence likelihood for these risk factors. Subjectivity, uncertainty and vagueness within the assessment process are dealt with using linguistic variables parameterized by trapezoid fuzzy numbers. By multiplying the degree of impact and the occurrence likelihood of risk factors, estimated severity values of each identified risk factor are determined. Based on the assessment results, the construction agencies were informed of what risks should be noticed and what they should do to avoid the risks. That is, it enables construction agencies of railway reconstruction to plan the appropriate risk responses/strategies to increase the opportunity of project success and effectiveness. PMID:24772014
Human Factors Simulation in Construction Management Education
ERIC Educational Resources Information Center
Jaeger, M.; Adair, D.
2010-01-01
Successful construction management depends primarily on the representatives of the involved construction project parties. In addition to effective application of construction management tools and concepts, human factors impact significantly on the processes of any construction management endeavour. How can human factors in construction management…
NASA Technical Reports Server (NTRS)
1992-01-01
Even though the executive branch has proposed terminating the Advanced Solid Rocket Motor (ASRM) program, NASA is proceeding with all construction activity planned for FY 1992 to avoid schedule slippage if the program is reinstated by Congress. However, NASA could delay some construction activities for at least a few months without affecting the current launch data schedule. For example, NASA could delay Yellow Creek's motor storage and dock projects, Stennis' dock project, and Kennedy's rotation processing and surge facility and dock projects. Starting all construction activities as originally planned could result in unnecessarily incurring additional costs and termination liability if the funding for FY 1993 is not provided. If Congress decides to continue the program, construction could still be completed in time to avoid schedule slippage.
Environmental problems caused by Istanbul subway excavation and suggestions for remediation
NASA Astrophysics Data System (ADS)
Ocak, Ibrahim
2009-10-01
Many environmental problems caused by subway excavations have inevitably become an important point in city life. These problems can be categorized as transporting and stocking of excavated material, traffic jams, noise, vibrations, piles of dust mud and lack of supplies. Although these problems cause many difficulties, the most pressing for a big city like Istanbul is excavation, since other listed difficulties result from it. Moreover, these problems are environmentally and regionally restricted to the period over which construction projects are underway and disappear when construction is finished. Currently, in Istanbul, there are nine subway construction projects in operation, covering approximately 73 km in length; over 200 km to be constructed in the near future. The amount of material excavated from ongoing construction projects covers approximately 12 million m3. In this study, problems—primarily, the problem with excavation waste (EW)—caused by subway excavation are analyzed and suggestions for remediation are offered.
Novel Therapy for Bone Regeneration in Large Segmental Defects
2017-12-01
HC, Giannoudis PV. Fat embolism and IM nailing. Injury. 2006;37(Suppl 4):S1–2. 38. Wenda K, Ritter G, Degreif J, Rudigier J. Pathogenesis of pul...morphogenetic protein (BMP), thrombopoietin (TPO), therapy, fracture healing, bone regeneration, minipig, pig 16. SECURITY CLASSIFICATION OF: 17... fracture healing, bone regeneration, minipig, pig 3. OVERALL PROJECT SUMMARY: Project start date 30/09/2013 Project end date 29/09/2017 (with 1 year NCE
Waste diminution in Construction projects: Environmental Predicaments
NASA Astrophysics Data System (ADS)
Gharehbaghi, Koorosh; Scott-Young, Christina
2018-03-01
Waste diminution in construction projects is not only a behavioural issue, but also an energy consumption and reduction concern. With construction waste equating to the significant amount of exhausted energy together with increased pollution, this contributes to a series of environmental predicaments. The overall goal of construction solid Waste Management is to collect, treat and dispose of solid wastes generated by project activities in an environmentally and socially satisfactory manner, using the most economical means available. As cities expand, their construction activities and consumption patterns further drive up the solid waste quantities. Governments are usually authorized to have responsibility for providing solid Waste Management services, and various administrative laws give them exclusive ownership over the waste produced. In addition, construction waste processing can be further controlled and minimized according to specialized authorities such as Environmental Protection Agencies (EPA) and their relevant acts and regulations. Moreover, a Construction Environmental Management Plan (CEMP) can further control the treatment of waste and therefore, reduce the amount produced. Key elements of a CEMP not only include complying with relevant legislation, standards and guidance from the EPA; however, also to ensuring that there are systems in place to resolve any potential problems associated with site activities. Accordingly, as a part of energy consumption and lessening strategies, this paper will discuss various effective waste reduction methods for construction projects. Finally, this paper will also examine tactics to further improve energy efficiency through innovative construction Waste Management strategies (including desirability rating of most favourable options) to promote the lessening of overall CO2production.
Rational Emotive Behavior Therapy: Origins, Constructs, and Applications.
ERIC Educational Resources Information Center
Watson, Joshua C.
In 1956, Dr. Albert Ellis presented his seminal work on Rational Therapy, subsequently renamed Rational Emotive Behavior Therapy (REBT) in 1993. This paper explores the origins, theoretical foundations, applications, and implications of REBT and provides a look at the empirical research available in support of the approach's efficacy. REBT is…
A Pilot Study of Marital Therapy as a Treatment for Depression.
ERIC Educational Resources Information Center
Waring, Edward M.; And Others
1995-01-01
Seventeen depressed, married women were assigned to marital therapy or a waiting list control group. Couples received 10 sessions of Enhancing Marital Intimacy Therapy (EMIT), a structured technique involving the self-disclosure of personal constructs. Comparisons revealed a significant reduction in the experimental group's depressive…
East Meet West? U.S. and China: Strategies for Global Leadership
2013-03-01
construct to serve as a broader framework for this research project to describe instruments of national power in a constantly changing, resource...construct to serve as a broader framework for this research project to describe instruments of national power in a constantly changing, resource...for this research project to describe instruments of national power in a constantly changing, resource-constrained, geopolitical environment. This
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-07
...\\ cent of the sales tax revenue for road construction projects for the next 20 years, beginning in 2013... Department of Roads to fund the project entirely with newly acquired state funds. NDOR plans to have the...) and determined that funding for construction of the project was not likely to be available for the...
A post-genomic surprise. The molecular reinscription of race in science, law and medicine.
Duster, Troy
2015-03-01
The completion of the first draft of the Human Genome Map in 2000 was widely heralded as the promise and future of genetics-based medicines and therapies - so much so that pundits began referring to the new century as 'The Century of Genetics'. Moreover, definitive assertions about the overwhelming similarities of all humans' DNA (99.9 per cent) by the leaders of the Human Genome Project were trumpeted as the end of racial thinking about racial taxonomies of human genetic differences. But the first decade of the new century brought unwelcomed surprises. First, gene therapies turned out to be far more complicated than any had anticipated - and instead the pharmaceutical industry turned to a focus on drugs that might be 'related' to population differences based upon genetic markers. While the language of 'personalized medicine' dominated this frame, research on racially and ethnically designated populations differential responsiveness to drugs dominated the empirical work in the field. Ancestry testing and 'admixture research' would play an important role in a new kind of molecular reification of racial categories. Moreover, the capacity of the super-computer to map differences reverberated into personal identification that would affect both the criminal justice system and forensic science, and generate new levels of concern about personal privacy. Social scientists in general, and sociologists in particular, have been caught short by these developments - relying mainly on assertions that racial categories are socially constructed, regionally and historically contingent, and politically arbitrary. While these assertions are true, the imprimatur of scientific legitimacy has shifted the burden, since now 'admixture research' can claim that its results get at the 'reality' of human differentiation, not the admittedly flawed social constructions of racial categories. Yet what was missing from this framing of the problem: 'admixture research' is itself based upon socially constructed categories of race. © London School of Economics and Political Science 2015.
DOT National Transportation Integrated Search
2010-09-01
Tools are proposed for carbon footprint estimation of transportation construction projects and decision support : for construction firms that must make equipment choice and usage decisions that affect profits, project duration : and greenhouse gas em...
40. Photographic copy of original construction drawing, dated June 1911 ...
40. Photographic copy of original construction drawing, dated June 1911 (from paper-copy of aperture-card negative at Bureau of Reclamation, Pacific Northwest Regional Office, Boise, ID). ROOF PLAN. - Boise Project, Boise Project Office, 214 Broadway, Boise, Ada County, ID
38. Photographic copy of original construction drawing, dated June 1911 ...
38. Photographic copy of original construction drawing, dated June 1911 (from paper-copy of aperture-card negative at Bureau of Reclamation, Pacific Northwest Regional Office, Boise, ID). FIRST FLOOR PLAN. - Boise Project, Boise Project Office, 214 Broadway, Boise, Ada County, ID
37. Photographic copy of original construction drawing, dated June 1911 ...
37. Photographic copy of original construction drawing, dated June 1911 (from paper-copy of aperture-card negative at Bureau of Reclamation, Pacific Northwest Regional Office, Boise, ID). BASEMENT PLAN. - Boise Project, Boise Project Office, 214 Broadway, Boise, Ada County, ID
39. Photographic copy of original construction drawing, dated June 1911 ...
39. Photographic copy of original construction drawing, dated June 1911 (from paper-copy of aperture-card negative at Bureau of Reclamation, Pacific Northwest Regional Office, Boise, ID). SECOND FLOOR PLAN. - Boise Project, Boise Project Office, 214 Broadway, Boise, Ada County, ID
45. Photographic copy of original construction drawing, dated 16 February ...
45. Photographic copy of original construction drawing, dated 16 February 1916 (from paper-copy of aperture-card negative at Bureau of Reclamation, Pacific Northwest Regional Office, Boise, ID). LOT SURVEY. - Boise Project, Boise Project Office, 214 Broadway, Boise, Ada County, ID
41. Photographic copy of original construction drawing, dated June 1911 ...
41. Photographic copy of original construction drawing, dated June 1911 (from paper-copy of aperture-card negative at Bureau of Reclamation, Pacific Northwest Regional Office, Boise, ID). CROSS SECTIONS. - Boise Project, Boise Project Office, 214 Broadway, Boise, Ada County, ID
Distribution factors for construction loads and girder capacity equations [project summary].
DOT National Transportation Integrated Search
2017-03-01
This project focused on the use of Florida I-beams (FIBs) in bridge construction. University of Florida researchers used analytical models and finite element analysis to update equations used in the design of bridges using FIBs. They were particularl...
Evaluation of Three Porous Pavement Systems in a Newly Constructed Parking Lot
This project examines porous pavement systems in a newly constructed parking lot next to Building 205 at the Edison Environmental Center. Porous pavement systems are one means of promoting environmental sustainability through stormwater runoff reduction. This project examines t...
DOT National Transportation Integrated Search
1995-06-30
Topographic surface modeling using a Geographic Information System (GIS) can be useful for the prediction of soil erosion resulting from highway construction projects. The assumption is that terrain, along with other parameters, will influence the po...
DOT National Transportation Integrated Search
2006-02-01
In order to ensure top quality construction projects, contracts need to be awarded to the most qualified : contractor. At the time of this research, NMDOT projects often went to the lowest, not necessarily the : most qualified, bidder. The objective ...
76 FR 78252 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-16
..., Rubicon Trail Easement and Resource Improvement Project, Construction and Operation, Right-of-Way Grant...: Andrea Catanzaro (409) 766-6346 EIS No. 20110421, Draft EIS, USFS, CA, Greys Mountain Ecological...--La Crosse Transmission System Improvement Project, Proposed Construction and Operation of a 345...
ERIC Educational Resources Information Center
Lieberfeld, Lawrence
1982-01-01
Many crucial questions need to be answered before a college embarks on a construction project and makes a substantial financial commitment. Computer modeling techniques can be used to make even complex project feasibility analyses. Available from Peat, Marwick, Mitchell & Co., 345 Park Avenue, New York, NY 10154. (MSE)
23 CFR 635.305 - Physical construction.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 23 Highways 1 2011-04-01 2011-04-01 false Physical construction. 635.305 Section 635.305 Highways... CONSTRUCTION AND MAINTENANCE Physical Construction Authorization § 635.305 Physical construction. For purposes of this subpart the physical construction of a project is considered to consist of the actual...
23 CFR 635.305 - Physical construction.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 23 Highways 1 2010-04-01 2010-04-01 false Physical construction. 635.305 Section 635.305 Highways... CONSTRUCTION AND MAINTENANCE Physical Construction Authorization § 635.305 Physical construction. For purposes of this subpart the physical construction of a project is considered to consist of the actual...
23 CFR 635.305 - Physical construction.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 23 Highways 1 2012-04-01 2012-04-01 false Physical construction. 635.305 Section 635.305 Highways... CONSTRUCTION AND MAINTENANCE Physical Construction Authorization § 635.305 Physical construction. For purposes of this subpart the physical construction of a project is considered to consist of the actual...
23 CFR 635.305 - Physical construction.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 23 Highways 1 2014-04-01 2014-04-01 false Physical construction. 635.305 Section 635.305 Highways... CONSTRUCTION AND MAINTENANCE Physical Construction Authorization § 635.305 Physical construction. For purposes of this subpart the physical construction of a project is considered to consist of the actual...
23 CFR 635.305 - Physical construction.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 23 Highways 1 2013-04-01 2013-04-01 false Physical construction. 635.305 Section 635.305 Highways... CONSTRUCTION AND MAINTENANCE Physical Construction Authorization § 635.305 Physical construction. For purposes of this subpart the physical construction of a project is considered to consist of the actual...
Research on construction quality and improvement of assembly construction
NASA Astrophysics Data System (ADS)
Cheng, Fei
2017-11-01
Based on the acceleration of the urbanization process and the improvement of the quality of life of our residents, the demand for building construction has been increasing. In this context, the construction industry in order to promote the construction efficiency, quality improvement, to meet the needs of the development of the times to strengthen the new technology, the use of new technologies. At present, China’s engineering construction units in the process of carrying out the project to strengthen the use of assembly-type construction technology, which thus achieved for the traditional construction work low-level, high time-consuming issues, and promote the steady improvement of production efficiency. Based on this, this paper focuses on the analysis of the connotation of the assembly structure and analyzes the quality problems in the construction process of the construction projects and puts forward the improvement measures to promote the improvement of the building quality and the construction of the building Construction speed. Based on this, this paper analyzes the structural system and design of prefabricated building.
NASA Astrophysics Data System (ADS)
Abramov, Ivan
2018-03-01
Development of design documentation for a future construction project gives rise to a number of issues with the main one being selection of manpower for structural units of the project's overall implementation system. Well planned and competently staffed integrated structural construction units will help achieve a high level of reliability and labor productivity and avoid negative (extraordinary) situations during the construction period eventually ensuring improved project performance. Research priorities include the development of theoretical recommendations for enhancing reliability of a structural unit staffed as an integrated construction crew. The author focuses on identification of destabilizing factors affecting formation of an integrated construction crew; assessment of these destabilizing factors; based on the developed mathematical model, highlighting the impact of these factors on the integration criterion with subsequent identification of an efficiency and reliability criterion for the structural unit in general. The purpose of this article is to develop theoretical recommendations and scientific and methodological provisions of an organizational and technological nature in order to identify a reliability criterion for a structural unit based on manpower integration and productivity criteria. With this purpose in mind, complex scientific tasks have been defined requiring special research, development of corresponding provisions and recommendations based on the system analysis findings presented herein.
Wife-Battering: A Theoretical Construct and Case Report.
ERIC Educational Resources Information Center
Guerney, Bernard, Jr.; And Others
1987-01-01
Presents a theoretical construct (prostrate-detonate-dominate-ingratiate) to explain the development and maintenance of wife-battering. Ties the construct to research evidence and, along with clinical observations, uses it to develop a rationale for a type of therapy deemed effective with wife-batters: group marital Relationship Enhancement.…
1984-01-01
PROJECT S TYPE OF REPORT & PERIOD COVEREDOSAGE RIVER BASIN ConStruction Foundation OSAGE RIVER MISSOURI Report from September 1966 HARRY S. TRUMAN DAM...OPERATION AND MAINTENANCE MANUAL HARRY S. TRUMAN DAM AND RESERVOIR OSAGE RIVER, MISSOURI APPENDIX VII CONSTRUCTION FOUNDATION REPORT VOLUME II TABLE OF...09r IWNI’(ANSAS CITY M?5OU ....... 11 1 O IA R, MISSOURI HARRY S TRUMA DAM & 1K5(V01 = CONSTRUCT"ON FOUNDATION REPORT IGEOLOGIC UNIT DESCRIPTIONS
Power Grid Construction Project Portfolio Optimization Based on Bi-level programming model
NASA Astrophysics Data System (ADS)
Zhao, Erdong; Li, Shangqi
2017-08-01
As the main body of power grid operation, county-level power supply enterprises undertake an important emission to guarantee the security of power grid operation and safeguard social power using order. The optimization of grid construction projects has been a key issue of power supply capacity and service level of grid enterprises. According to the actual situation of power grid construction project optimization of county-level power enterprises, on the basis of qualitative analysis of the projects, this paper builds a Bi-level programming model based on quantitative analysis. The upper layer of the model is the target restriction of the optimal portfolio; the lower layer of the model is enterprises’ financial restrictions on the size of the enterprise project portfolio. Finally, using a real example to illustrate operation proceeding and the optimization result of the model. Through qualitative analysis and quantitative analysis, the bi-level programming model improves the accuracy and normative standardization of power grid enterprises projects.
Community Meeting to Focus on NREL Construction Plans
Community Meeting to Focus on NREL Construction Plans For more information contact: Kerry Masson issues including planned construction projects on NREL's 300-acre campus. Construction plans include
Cheikh Ismail, L; Knight, H E; Bhutta, Z; Chumlea, W C
2013-09-01
The primary aim of the INTERGROWTH-21(st) Project is to construct new, prescriptive standards describing optimal fetal and preterm postnatal growth. The anthropometric measurements include the head circumference, recumbent length and weight of the infants, and the stature and weight of the parents. In such a large, international, multicentre project, it is critical that all study sites follow standardised protocols to ensure maximal validity of the growth and nutrition indicators used. This paper describes, in detail, the selection of anthropometric personnel, equipment, and measurement and calibration protocols used to construct the new standards. Implementing these protocols at each study site ensures that the anthropometric data are of the highest quality to construct the international standards. © 2013 Royal College of Obstetricians and Gynaecologists.
Acupuncture therapy related cardiac injury.
Li, Xue-feng; Wang, Xian
2013-12-01
Cardiac injury is the most serious adverse event in acupuncture therapy. The causes include needling chest points near the heart, the cardiac enlargement and pericardial effusion that will enlarge the projected area on the body surface and make the proper depth of needling shorter, and the incorrect needling method of the points. Therefore, acupuncture practitioners must be familiar with the points of the heart projected area on the chest and the correct needling methods in order to reduce the risk of acupuncture therapy related cardiac injury.