76 FR 68260 - Availability of Finding of No Significant Impact
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-03
... evaluate the potential environmental impacts from replacement of a 600 foot section of timber pile supported pier with concrete pile supports and decking. The timber pile pier section to be replaced...
Load rating and retrofit testing of bridge timber piles subjected to eccentric loading.
DOT National Transportation Integrated Search
2012-11-01
This report first evaluated the load rating procedure currently in use by the Illinois Department of Transportation (IDOT) for rating timber : piles supporting multiple-span, simply supported bridges. For simplicity, these piles are often rated under...
Assessment and evaluation of timber piles used in Nebraska for retrofit and rating.
DOT National Transportation Integrated Search
2014-04-01
The cost of an effective retrofitting and rehabilitation of timber piles is less than cost of replacing the piles. However, some of the retrofit options used in Nebraska failed to result in the expected performance levels. Further, design and detaili...
Load rating and FRP retrofitting of bridge abutment timber piles.
DOT National Transportation Integrated Search
2016-05-01
This report details Phase II of the study titled Strengthening of Bridge Wood Piling Retrofits for Moment Resistance. Phase I of the research (project : R27-082) was focused on developing a load rating method for timber piles under eccentric load and...
Load capacity of hollowed timber piles.
DOT National Transportation Integrated Search
1998-12-01
The goal of this study was to develop a reliable load-rating methodology for timber piles based on the level of documented damage. Louisiana currently has over 4,000 timber bridges in its inventory of over 13,800 bridges. A quarter of these 4,000 tim...
Effect of incipient decay on compressive strength and stiffness of timber piles.
DOT National Transportation Integrated Search
1997-12-01
The goal of this study was to develop guidelines for bench marking strength and stiffness properties of deteriorated in-service timber piles as a function of the age of the pile and the in-service environment. A parallel research project undertaken t...
Interior of Tunnel No. 1356, Stick Pile Tunnel showing timber ...
Interior of Tunnel No. 1356, Stick Pile Tunnel showing timber framing and missing posts, looking northeast. - Western Maryland Railway, Cumberland Extension, Pearre to North Branch, from WM milepost 125 to 160, Pearre, Washington County, MD
Emissions from prescribed burning of timber slash piles in Oregon.
Emissions from burning piles of post-harvest timber slash (Douglas fir) in Grande Ronde, Oregon were sampled using an instrument platform lofted into the plume using a tether-controlled aerostat or balloon. Emissions of carbon monoxide, carbon dioxide, methane, particulate matte...
NASA Astrophysics Data System (ADS)
Sadeghi, H.
2015-12-01
Bridges are major elements of infrastructure in all societies. Their safety and continued serviceability guaranties the transportation and emergency access in urban and rural areas. However, these important structures are subject to earthquake induced damages in structure and foundations. The basic approach to the proper support of foundations are a) distribution of imposed loads to foundation in a way they can resist those loads without excessive settlement and failure; b) modification of foundation ground with various available methods; and c) combination of "a" and "b". The engineers has to face the task of designing the foundations meeting all safely and serviceability criteria but sometimes when there are numerous environmental and financial constrains, the use of some traditional methods become inevitable. This paper explains the application of timber piles to improve ground resistance to liquefaction and to secure the abutments of short to medium length bridges in an earthquake/liquefaction prone area in Bohol Island, Philippines. The limitations of using the common ground improvement methods (i.e., injection, dynamic compaction) because of either environmental or financial concerns along with the abundance of timber in the area made the engineers to use a network of timber piles behind the backwalls of the bridge abutments. The suggested timber pile network is simulated by numerical methods and its safety is examined. The results show that the compaction caused by driving of the piles and bearing capacity provided by timbers reduce the settlement and lateral movements due to service and earthquake induced loads.
DOT National Transportation Integrated Search
1983-12-01
"This study presents methods for establishing allowable stresses in steel, concrete, and timber piles using load/resistance factor concepts. These methods take into account not only the material properties of the pile itself but also the individual e...
Bridge scour and change in contracted section, Razor Creek
Holnbeck, Stephen R.; Parrett, Charles; Tillinger, Todd N.; ,
1993-01-01
Two large floods, 3 and 4 times the estimated 100-year peak discharge, occurred in 1986 and 1991 at a timber-pile bridge over Razor Creek in Montana. A bridge section surveyed after the 1991 flood was compared with a 1955 design section and showed total scour of 0.85 m at the left abutment, 2.23 m at the right abutment, and 0. 94 m at the pile bents. Calculated total scour based on equations recommended by the Federal Highway Administration and data obtained after the 1991 flood was 3.20 m at the left abutment, 4.36 m at the right abutment, and 2.13 m at the pile bents. Residual scour from floods prior to 1986 was presumed to be negligible because no floods of significant magnitude were documented. Also, scour for the 1986 flood is believed to be significantly less than for the 1991 flood because the 1986 peak discharge was significantly smaller and the contracted section for the 1986 peak discharge was 22 m upstream from the bridge.
Aerial Sampling of Emissions from Biomass Pile Burns in ...
Abstract (already cleared). Emissions from burning piles of post-harvest timber slash in Grande Ronde, Oregon were sampled using an instrument platform lofted into the plume using a tether-controlled aerostat or balloon. Emissions of carbon monoxide, carbon dioxide, methane, particulate matter (PM2.5 µm), black carbon, ultraviolet absorbing PM, elemental/organic carbon, semi-volatile organics (polycyclic aromatic hydrocarbons and polychlorinated dibenzodioxins/dibenzofurans), filter-based metals, and volatile organics were sampled for determination of emission factors. The effect on emissions from covering or not covering piles with polyethylene sheets to prevent fuel wetting was determined. Results showed that the uncovered (“wet”) piles burned with lower combustion efficiency and higher emissions of volatile organic compounds. Results for other pollutants will also be discussed. This work determines the first known in-field emission factors for burning of timber slash piles. The results also document the effect on emissions of covering the piles with polyethylene covers to reduce the moisture content of the biomass.
Emissions from prescribed burning of timber slash piles in Oregon
NASA Astrophysics Data System (ADS)
Aurell, Johanna; Gullett, Brian K.; Tabor, Dennis; Yonker, Nick
2017-02-01
Emissions from burning piles of post-harvest timber slash (Douglas-fir) in Grande Ronde, Oregon were sampled using an instrument platform lofted into the plume using a tether-controlled aerostat or balloon. Emissions of carbon monoxide, carbon dioxide, methane, particulate matter (PM2.5), black carbon, ultraviolet absorbing PM, elemental/organic carbon, filter-based metals, polycyclic aromatic hydrocarbons (PAHs), polychlorinated dibenzodioxins/dibenzofurans (PCDD/PCDF), and volatile organic compounds (VOCs) were sampled to determine emission factors, the amount of pollutant formed per amount of biomass burned. The effect on emissions from covering the piles with polyethylene (PE) sheets to prevent fuel wetting versus uncovered piles was also determined. Results showed that the uncovered ("wet") piles burned with lower combustion efficiency and higher emission factors for VOCs, PM2.5, PCDD/PCDF, and PAHs. Removal of the PE prior to ignition, variation of PE size, and changing PE thickness resulted in no statistical distinction between emissions. Results suggest that dry piles, whether covered with PE or not, exhibited statistically significant lower emissions than wet piles due to better combustion efficiency.
Creosote treated timber in the Alaskan marine environment : volume ii.
DOT National Transportation Integrated Search
2010-02-01
ADOT&PF is responsible for many structures that incorporate wood pilings and other timber in Alaska waters. Most are treated with preservative to inhibit marine borers : that will quickly destroy unprotected wood. Creosote is generally the most econo...
Creosote treated timber in the Alaskan marine environment : Volume I.
DOT National Transportation Integrated Search
2010-02-01
ADOT&PF is responsible for many structures that incorporate wood pilings and other timber in Alaska waters. Most are treated with preservative to inhibit marine borers : that will quickly destroy unprotected wood. Creosote is generally the most econo...
Aerial sampling of emissions from biomass pile burns in Oregon
Emissions from burning piles of post-harvest timber slash in Grande Ronde, Oregon were sampled using an instrument platform lofted into the plume using a tether-controlled aerostat or balloon. Emissions of carbon monoxide, carbon dioxide, methane, particulate matter (PM2.5 µm), ...
Aerial Sampling of Emissions from Biomass Pile Burns in Oregon
Emissions from burning piles of post-harvest timber slash in Grande Ronde, Oregon were sampled using an instrument platform lofted into the plume using a tether-controlled aerostat or balloon. Emissions of carbon monoxide, carbon dioxide, methane, particulate matter (PM2.5 µm), ...
Failure of coastal protection at Seacliff State Beach, Santa Cruz County, California, USA
NASA Astrophysics Data System (ADS)
Griggs, Gary B.; Fulton-Bennett, Kim W.
1987-03-01
Seacliff State Beach, along the shoreline of northern Monterey Bay, California, has a well-documented history of repeated destruction and reconstruction of seawalls and park facilities. Seven times in 60 years the timber seawall has been destroyed by winter storm waves and subsequently rebuilt. The deficiencies of the wall, including (a) inadequate attachment of timber lagging to pilings, (b) inability of pilings or lagging to withstand repeated impact of waves and logs, and (c) inadequate height and internal drainage system have never been adequately addressed and each successive wall has essentially been identical to the previously destroyed wall.
Evaluation of Nondestructive Underwater Timber Inspection Techniques
1984-08-01
possible to codice their presnce. Figure 1. Characteristics of marine borers. 3 Table 1. Accuracy Requirements for Timber Piles [Nomenclature at end of...Athens GA NAVSEASYSCOM Code OOC-D. Washington. DC: Codk PMS 395 A 3. Washington. DC; Code PMS 395 A2. Wasi~ington. DC; Codic PMS 396.3311 (Rekas), Wash
Ronald W. Wolfe
1999-01-01
Round timbers and ties represent some of the most efficient uses of our forest resources. They require a minimum of processing between harvesting the tree and marketing the structural commodity. Poles and piles are debarked or peeled, seasoned, and often treated with preservative prior to use as structural members. Construction logs are usually shaped to facilitate...
M. F. Jurgensen; A. E. Harvey; R. T. Graham; D. S. Page-Dumroese; J. R. Tonn; M. J. Larsen; T. B. Jain
1997-01-01
Soil organic components are important factors in the health and productivity of Inland Northwest forests. Timber harvesting and extensive site preparation (piling, windrowing, or scalping) reduces the amount of surface organic material (woody residues and forest floor layers) over large areas. Some wildfires and severe prescribed burns can have similar consequences....
Methods to reduce forest residue volume after timber harvesting and produce black carbon
Deborah S. Page-Dumroese; Matt D. Busse; James G. Archuleta; Darren McAvoy; Eric Roussel
2017-01-01
Forest restoration often includes thinning to reduce tree density and improve ecosystem processes and function while also reducing the risk of wildfire or insect and disease outbreaks. However, one drawback of these restoration treatments is that slash is often burned in piles that may damage the soil and require further restoration activities. Pile burning is...
Luke M. Cerise; Deborah S. Page-Dumroese; Paul McDaniel; Cole Mayn; Robert Heinse
2013-01-01
Site preparation following timber harvests is widely used to increase seedling establishment postharvest. Historically, dozer piling and ripping were the most common forms of site preparation in the Intermountain West. Less commonly, terracing of hill slopes was another form of site preparation on the Bitterroot National Forest in western Montana from 1961-1970 on...
William T. Simpson
2004-01-01
Equations for a two-dimensional finite difference heat flow analysis were developed and applied to ponderosa pine and Douglas-fir square timbers to calculate the time required to heat the center of the squares to target temperature. The squares were solid piled, which made their surfaces inaccessible to the heating air, and thus surface temperatures failed to attain...
Timber Piling Barrier and Chemical Preservation Annual Costs Comparison.
1987-06-01
has such an informative collection of pertinent records. The estimated useful life of PVC wrapped piling has been increasing yearly with the continued...by the more than 25 tons of floating debris that is collected from the harbor daily, there has been no failure of a wrapped pile. The relative...8217I Nuk \\% pns Sck OMu ’,iol ’L I t OS-IAS 14 ilu"M odk 41~IS I’cad l II-o Ill 0 OS-*IN-SN HI 51-4 )H it l uk s. %ctt O rl-un..I5 uk 2 ti I ()MNASSt
Jason C. Cross; Eric C. Turnblom; Gregory J. Ettl
2013-01-01
Biomass residue produced by timber harvest operations is estimated for the Olympic and Kitsap Peninsulas, Washington. Scattered residues were sampled in 53 harvest units and piled residues were completely enumerated in 55 harvest units. Production is based on 2008 and 2009 data and is stratified by forest location, ownership type, harvest intensity, and harvest method...
12. DETAIL VIEW OF WEST ABUTMENT AT Lo, SHOWING BRIDGE ...
12. DETAIL VIEW OF WEST ABUTMENT AT Lo, SHOWING BRIDGE SEAT, TIMBER PILES, STEEL SILL AND BACKWALL/WlNGWALL BOARDS, LOOKING NORTH - Cottonville Bridge, County Road D-61 at Farmer's Creek, Maquoketa, Jackson County, IA
Selection of preservatives for marine structural timbers in herring spawning areas.
DOT National Transportation Integrated Search
2012-12-01
Alaska marine harbors use wood for many structures that come in contact with saltwater, including piles, floats, and docks, because it is economical to buy and maintain. : However, wood immersed in saltwater is prone to attack by marine borers, vario...
Methods to Reduce Forest Residue Volume after Timber Harvesting and Produce Black Carbon.
Page-Dumroese, Deborah S; Busse, Matt D; Archuleta, James G; McAvoy, Darren; Roussel, Eric
2017-01-01
Forest restoration often includes thinning to reduce tree density and improve ecosystem processes and function while also reducing the risk of wildfire or insect and disease outbreaks. However, one drawback of these restoration treatments is that slash is often burned in piles that may damage the soil and require further restoration activities. Pile burning is currently used on many forest sites as the preferred method for residue disposal because piles can be burned at various times of the year and are usually more controlled than broadcast burns. In many cases, fire can be beneficial to site conditions and soil properties, but slash piles, with a large concentration of wood, needles, forest floor, and sometimes mineral soil, can cause long-term damage. We describe several alternative methods for reducing nonmerchantable forest residues that will help remove excess woody biomass, minimize detrimental soil impacts, and create charcoal for improving soil organic matter and carbon sequestration.
Aerial sampling of emissions from biomass pile burns in ...
Emissions from burning piles of post-harvest timber slash in Grande Ronde, Oregon were sampled using an instrument platform lofted into the plume using a tether-controlled aerostat or balloon. Emissions of carbon monoxide, carbon dioxide, methane, particulate matter (PM2.5 µm), black carbon, ultraviolet absorbing PM, elemental/organic carbon, semi-volatile organics (polycyclic aromatic hydrocarbons and polychlorinated dibenzodioxins/dibenzofurans), filter-based metals, and volatile organics were sampled for determination of emission factors. The effect on emissions from covering or not covering piles with polyethylene sheets to prevent fuel wetting was determined. Results showed that the uncovered (“wet”) piles burned with lower combustion efficiency and higher emissions of volatile organic compounds. Results for other pollutants will also be discussed. This work determined the emissions from open burning of forest slash wood, with and without plastic sheeting. The foresters advocate the use of plastic to keep the slash wood dry and aid in the controlled combustion of the slash to reduce fuel loading. Concerns about the emissions from the burning plastic prompted this work which conducted an extensive characterization of dry, wet, and dry with plastic slash pile emissions.
Methods to Reduce Forest Residue Volume after Timber Harvesting and Produce Black Carbon
Busse, Matt D.; Archuleta, James G.; McAvoy, Darren; Roussel, Eric
2017-01-01
Forest restoration often includes thinning to reduce tree density and improve ecosystem processes and function while also reducing the risk of wildfire or insect and disease outbreaks. However, one drawback of these restoration treatments is that slash is often burned in piles that may damage the soil and require further restoration activities. Pile burning is currently used on many forest sites as the preferred method for residue disposal because piles can be burned at various times of the year and are usually more controlled than broadcast burns. In many cases, fire can be beneficial to site conditions and soil properties, but slash piles, with a large concentration of wood, needles, forest floor, and sometimes mineral soil, can cause long-term damage. We describe several alternative methods for reducing nonmerchantable forest residues that will help remove excess woody biomass, minimize detrimental soil impacts, and create charcoal for improving soil organic matter and carbon sequestration. PMID:28377830
Logging debris matters: better soil, fewer invasive plants
John Kirkland; Timoth B. Harrington; David H. Peter; Robert A. Slesak; Stephen H. Schoenholtz
2012-01-01
The logging debris that remains after timber harvest traditionally has been seen as a nuisance. It can make subsequent tree planting more difficult and become fuel for wildfire. It is commonly piled, burned, or taken off site. Logging debris, however, contains significant amounts of carbon and nitrogenâelements critical to soil productivity. Its physical presence in...
Mechanized or hand operations: which is less expensive for small timber?
Robert Rummber; John Klepac
2002-01-01
Two harvesting systems, one manual post-and-rail and one small-scale cut-to-length harvester, were compared in a lodgepole pine thinning. Elemental time study data were collected, along with estimates of residual stand damage. The harvester was about as productive as a manual crew of five. For material 5" and larger, the cost for felling, processing and piling...
Sevda Alanya-Rosenbaum; Richard D. Bergman; Indroneil Ganguly; Francesca Pierobon
2018-01-01
Timber harvest activities in the western United States have resulted in large volumes of low- to no-value logging (forest) residues. Alternatives to pile-and-burning are needed to best utilize this material and to mitigate the resultant environmental impacts. Briquetting (densifying) forest residues near-woods is one such option and is the focus of this study. This...
David H. Peter; Timothy B. Harrington
2012-01-01
To increase timber production and manage other forest resource values, some land managers have undertaken logging debris and vegetation control treatments after forest harvest. We explored the roles of clearcutting on plant community composition and structure at three sites where logging debris was dispersed, piled, or removed and vegetation was annually treated or not...
Flexible pile thermal barrier insulator
NASA Technical Reports Server (NTRS)
Anderson, G. E.; Fell, D. M.; Tesinsky, J. S. (Inventor)
1978-01-01
A flexible pile thermal barrier insulator included a plurality of upstanding pile yarns. A generally planar backing section supported the upstanding pile yarns. The backing section included a plurality of filler yarns forming a mesh in a first direction. A plurality of warp yarns were looped around said filler yarns and pile yarns in the backing section and formed a mesh in a second direction. A binder prevented separation of the yarns in the backing section.
de Souza, Amaury Paulo; Minette, Luciano José; Sanches, André Luis Petean; da Silva, Emília Pio; Rodrigues, Valéria Antônia Justino; de Oliveira, Luciana Aparecida
2012-01-01
There are several forest operations involved in Eucalyptus timber harvesting. This study was carried out during brush-cutting; tree felling, bucking, delimbing, piling and manual extraction operations, with the following objectives: a) analyzing, ergonomically, two systems of brush-cutting: one manual and the other semi-mechanized, using two different machines; b) ergonomically evaluating three different brands of pruner machines used in delimbing felled trees. c) determining the feasible target of productivity as a function of ergonomic factors relevant to establish the time of resting pauses for workers in manual and semi-mechanized timber harvesting systems in mountainous terrain. Brush-cutting, either manual or semimechanized, is an activity carried out prior to timber harvesting. It is usually a hard work, with low productivity when compared with mechanized systems. Pruner machines have been used by forest companies, due to the great possibilities to improve productivity, quality and the health of workers. Ergonomics is a discipline that promotes the adequacy of work to the physical and mental characteristics of human beings, seeking to design production systems and products considering relevant aspects, including social, organizational and environmental factors. Companies should consider the ergonomic factor in the determination of daily worker production targets.
Impact of Underwater Explosions on Concrete Bridge Foundations
2016-06-01
www.theconstructioncivil.org/ [16] M. Aggour, A. Hachichi and M. Mayer, “Nondestructive evaluation of timber bridge piles,” in Proceedings of a Session a Structure Congress...detonation must be executed a safe distance from any critical infrastructure to ensure the survivability of the structure . This thesis implements...be executed a safe distance from any critical infrastructure to ensure the survivability of the structure . This thesis implements the Dynamic System
Plastic Coatings and Wraps for New Marine Timber Piling
1990-05-01
1985 Tema Nauclea diderrichii - (F.F.K. Ampong) June 1985 Sekondi untreated 4 ITALY Pinus sylvestris (Anna Gambetta) untreated Follonica 5 Malaysia...West) (K. DaIjeet Singh) 6 Malaysia (East) (C. Chan) 7 NEW ZEALAND April 1986 Pinus radiata sapwood (D.V. Plackett) (See IRG/WP/4121). Tauranga Harbour...interfering with final curing process. CLEANING: Tools and equipment should be cleaned prior to curing of the product with methylene chloride, methyl ethyl
NASA Astrophysics Data System (ADS)
Oberlyn Simanjuntak, Johan; Suita, Diana
2017-12-01
Pile foundation is one type deep foundation that serves to distribute the load of hard soil structure loading which has a high bearing capacity that is located deep enough inside the soil. To determine the bearing capacity of the pile and at the same time control the Calendring results, the Pile Driving Analyzer (PDA) test at 8 pile sections from the 84 point piling section (10% of the number sections), the results were analyzed by CAPWAP SOFTWARE, and the highest bearing capacity of Ru 177 ton and the lowest bearing capacity of 111 tons, is bigger than the plan load which load plans that is 60,9 tons. Finally the PDA safe is bearing bearing capacity of the load planning.
Yu, Yang; Niederleithinger, Ernst; Li, Jianchun; Wiggenhauser, Herbert
2017-01-01
This paper presents a novel non-destructive testing and health monitoring system using a network of tactile transducers and accelerometers for the condition assessment and damage classification of foundation piles and utility poles. While in traditional pile integrity testing an impact hammer with broadband frequency excitation is typically used, the proposed testing system utilizes an innovative excitation system based on a network of tactile transducers to induce controlled narrow-band frequency stress waves. Thereby, the simultaneous excitation of multiple stress wave types and modes is avoided (or at least reduced), and targeted wave forms can be generated. The new testing system enables the testing and monitoring of foundation piles and utility poles where the top is inaccessible, making the new testing system suitable, for example, for the condition assessment of pile structures with obstructed heads and of poles with live wires. For system validation, the new system was experimentally tested on nine timber and concrete poles that were inflicted with several types of damage. The tactile transducers were excited with continuous sine wave signals of 1 kHz frequency. Support vector machines were employed together with advanced signal processing algorithms to distinguish recorded stress wave signals from pole structures with different types of damage. The results show that using fast Fourier transform signals, combined with principal component analysis as the input feature vector for support vector machine (SVM) classifiers with different kernel functions, can achieve damage classification with accuracies of 92.5% ± 7.5%. PMID:29258274
Code of Federal Regulations, 2012 CFR
2012-07-01
... round log or timber product originating in Liberia. 593.205 Section 593.205 Money and Finance: Treasury... on the importation of any round log or timber product originating in Liberia. Except as otherwise... section, the importation into the United States, directly or indirectly, of any round log or timber...
Code of Federal Regulations, 2013 CFR
2013-07-01
... round log or timber product originating in Liberia. 593.205 Section 593.205 Money and Finance: Treasury... on the importation of any round log or timber product originating in Liberia. Except as otherwise... section, the importation into the United States, directly or indirectly, of any round log or timber...
Code of Federal Regulations, 2014 CFR
2014-07-01
... round log or timber product originating in Liberia. 593.205 Section 593.205 Money and Finance: Treasury... on the importation of any round log or timber product originating in Liberia. Except as otherwise... section, the importation into the United States, directly or indirectly, of any round log or timber...
Code of Federal Regulations, 2011 CFR
2011-07-01
... round log or timber product originating in Liberia. 593.205 Section 593.205 Money and Finance: Treasury... on the importation of any round log or timber product originating in Liberia. Except as otherwise... section, the importation into the United States, directly or indirectly, of any round log or timber...
Thermal response test data of five quadratic cross section precast pile heat exchangers.
Alberdi-Pagola, Maria
2018-06-01
This data article comprises records from five Thermal Response Tests (TRT) of quadratic cross section pile heat exchangers. Pile heat exchangers, typically referred to as energy piles, consist of traditional foundation piles with embedded heat exchanger pipes. The data presented in this article are related to the research article entitled "Comparing heat flow models for interpretation of precast quadratic pile heat exchanger thermal response tests" (Alberdi-Pagola et al., 2018) [1]. The TRT data consists of measured inlet and outlet temperatures, fluid flow and injected heat rate recorded every 10 min. The field dataset is made available to enable model verification studies.
Analysis of Flexible Anchored Hollow WPC Quay Walls of the New Berth in Tur, Egypt
NASA Astrophysics Data System (ADS)
Elsayed, Ayman
2017-10-01
A seawall, also known as a bulkhead or retaining wall, is a structure built to reduce the effects of strong waves and to defend costal land from erosion. Traditionally, seawalls are made of steel, timber or concrete construction. Composite materials, however, have been recently introduced for their ease of installation/maintenance in dry processing, low cost, and environmentally friendly materials. A wood plastic composite (WPC) seawall system has been developed and patented for its unique hollow structure that can give greater stiffness and stability under various external stresses. This paper describes the development of design method used in the analysis of the WPC walls. The main challenge during the physical excavation works is to limit the deformations involved in order to minimize damage on adjacent structures. The deformations depend largely on the excavation and strutting procedures, but also on the properties of the structural elements like the soil, the sheet pile and strutting members. The detailed design procedure involves numerical analyses, national regulations and common practice considerations. The contribution of finite element method in this field was used herein to determine the lateral movements, the bending moments of the wall, the passive earth pressure of the soil and the tensile force exerted by the anchor rods. The overall objectives of this research can be divided into two categories, First calibration of the finite element model for the new Tur quay walls (the case study) and reviewing the results of the steel cross section that chosen and the suggested one. Second, analysis and comparing the results of WPC cross-sections with the designed Steel sheet pile wall (SPW).
30 CFR 77.215-4 - Refuse piles; abandonment.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Refuse piles; abandonment. 77.215-4 Section 77... MINES Surface Installations § 77.215-4 Refuse piles; abandonment. When a refuse pile is to be abandoned... refuse pile shall be abandoned in accordance with a plan submitted by the operator and approved by the...
30 CFR 77.214 - Refuse piles; general.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Refuse piles; general. 77.214 Section 77.214... Installations § 77.214 Refuse piles; general. (a) Refuse piles constructed on or after July 1, 1971, shall be..., tipples, or other surface installations and such piles shall not be located over abandoned openings or...
Image processing system for the measurement of timber truck loads
NASA Astrophysics Data System (ADS)
Carvalho, Fernando D.; Correia, Bento A. B.; Davies, Roger; Rodrigues, Fernando C.; Freitas, Jose C. A.
1993-01-01
The paper industry uses wood as its raw material. To know the quantity of wood in the pile of sawn tree trunks, every truck load entering the plant is measured to determine its volume. The objective of this procedure is to know the solid volume of wood stocked in the plant. Weighing the tree trunks has its own problems, due to their high capacity for absorbing water. Image processing techniques were used to evaluate the volume of a truck load of logs of wood. The system is based on a PC equipped with an image processing board using data flow processors. Three cameras allow image acquisition of the sides and rear of the truck. The lateral images contain information about the sectional area of the logs, and the rear image contains information about the length of the logs. The machine vision system and the implemented algorithms are described. The results being obtained with the industrial prototype that is now installed in a paper mill are also presented.
30 CFR 77.215-1 - Refuse piles; identification.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Refuse piles; identification. 77.215-1 Section... COAL MINES Surface Installations § 77.215-1 Refuse piles; identification. A permanent identification marker, at least six feet high and showing the refuse pile identification number as assigned by the...
Optimal Design of Sheet Pile Wall Embedded in Clay
NASA Astrophysics Data System (ADS)
Das, Manas Ranjan; Das, Sarat Kumar
2015-09-01
Sheet pile wall is a type of flexible earth retaining structure used in waterfront offshore structures, river protection work and temporary supports in foundations and excavations. Economy is an essential part of a good engineering design and needs to be considered explicitly in obtaining an optimum section. By considering appropriate embedment depth and sheet pile section it may be possible to achieve better economy. This paper describes optimum design of both cantilever and anchored sheet pile wall penetrating clay using a simple optimization tool Microsoft Excel ® Solver. The detail methodology and its application with examples are presented for cantilever and anchored sheet piles. The effects of soil properties, depth of penetration and variation of ground water table on the optimum design are also discussed. Such a study will help professional while designing the sheet pile wall penetrating clay.
Stacul, Stefano; Squeglia, Nunziante
2018-02-15
A Boundary Element Method (BEM) approach was developed for the analysis of pile groups. The proposed method includes: the non-linear behavior of the soil by a hyperbolic modulus reduction curve; the non-linear response of reinforced concrete pile sections, also taking into account the influence of tension stiffening; the influence of suction by increasing the stiffness of shallow portions of soil and modeled using the Modified Kovacs model; pile group shadowing effect, modeled using an approach similar to that proposed in the Strain Wedge Model for pile groups analyses. The proposed BEM method saves computational effort compared to more sophisticated codes such as VERSAT-P3D, PLAXIS 3D and FLAC-3D, and provides reliable results using input data from a standard site investigation. The reliability of this method was verified by comparing results from data from full scale and centrifuge tests on single piles and pile groups. A comparison is presented between measured and computed data on a laterally loaded fixed-head pile group composed by reinforced concrete bored piles. The results of the proposed method are shown to be in good agreement with those obtained in situ.
2018-01-01
A Boundary Element Method (BEM) approach was developed for the analysis of pile groups. The proposed method includes: the non-linear behavior of the soil by a hyperbolic modulus reduction curve; the non-linear response of reinforced concrete pile sections, also taking into account the influence of tension stiffening; the influence of suction by increasing the stiffness of shallow portions of soil and modeled using the Modified Kovacs model; pile group shadowing effect, modeled using an approach similar to that proposed in the Strain Wedge Model for pile groups analyses. The proposed BEM method saves computational effort compared to more sophisticated codes such as VERSAT-P3D, PLAXIS 3D and FLAC-3D, and provides reliable results using input data from a standard site investigation. The reliability of this method was verified by comparing results from data from full scale and centrifuge tests on single piles and pile groups. A comparison is presented between measured and computed data on a laterally loaded fixed-head pile group composed by reinforced concrete bored piles. The results of the proposed method are shown to be in good agreement with those obtained in situ. PMID:29462857
Code of Federal Regulations, 2010 CFR
2010-07-01
... round log or timber product originating in Liberia. 593.205 Section 593.205 Money and Finance: Treasury... on the importation of any round log or timber product originating in Liberia. Except as otherwise... product originating in Liberia is prohibited. Note to § 593.205: See section 593.510, which authorizes...
30 CFR 817.83 - Coal mine waste: Refuse piles.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 30 Mineral Resources 3 2013-07-01 2013-07-01 false Coal mine waste: Refuse piles. 817.83 Section... ACTIVITIES § 817.83 Coal mine waste: Refuse piles. Refuse piles shall meet the requirements of § 817.81, the... removed from the disposal area prior to placement of coal mine waste. Topsoil shall be removed, segregated...
30 CFR 816.83 - Coal mine waste: Refuse piles.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 30 Mineral Resources 3 2014-07-01 2014-07-01 false Coal mine waste: Refuse piles. 816.83 Section... ACTIVITIES § 816.83 Coal mine waste: Refuse piles. Refuse piles shall meet the requirements of § 816.81, the... removed from the disposal area prior to placement of coal mine waste. Topsoil shall be removed, segregated...
30 CFR 817.83 - Coal mine waste: Refuse piles.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 30 Mineral Resources 3 2014-07-01 2014-07-01 false Coal mine waste: Refuse piles. 817.83 Section... ACTIVITIES § 817.83 Coal mine waste: Refuse piles. Refuse piles shall meet the requirements of § 817.81, the... removed from the disposal area prior to placement of coal mine waste. Topsoil shall be removed, segregated...
30 CFR 816.83 - Coal mine waste: Refuse piles.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 30 Mineral Resources 3 2013-07-01 2013-07-01 false Coal mine waste: Refuse piles. 816.83 Section... ACTIVITIES § 816.83 Coal mine waste: Refuse piles. Refuse piles shall meet the requirements of § 816.81, the... removed from the disposal area prior to placement of coal mine waste. Topsoil shall be removed, segregated...
30 CFR 817.83 - Coal mine waste: Refuse piles.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 30 Mineral Resources 3 2012-07-01 2012-07-01 false Coal mine waste: Refuse piles. 817.83 Section... ACTIVITIES § 817.83 Coal mine waste: Refuse piles. Refuse piles shall meet the requirements of § 817.81, the... removed from the disposal area prior to placement of coal mine waste. Topsoil shall be removed, segregated...
30 CFR 816.83 - Coal mine waste: Refuse piles.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Coal mine waste: Refuse piles. 816.83 Section... ACTIVITIES § 816.83 Coal mine waste: Refuse piles. Refuse piles shall meet the requirements of § 816.81, the... removed from the disposal area prior to placement of coal mine waste. Topsoil shall be removed, segregated...
30 CFR 816.83 - Coal mine waste: Refuse piles.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Coal mine waste: Refuse piles. 816.83 Section... ACTIVITIES § 816.83 Coal mine waste: Refuse piles. Refuse piles shall meet the requirements of § 816.81, the... removed from the disposal area prior to placement of coal mine waste. Topsoil shall be removed, segregated...
30 CFR 816.83 - Coal mine waste: Refuse piles.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 30 Mineral Resources 3 2012-07-01 2012-07-01 false Coal mine waste: Refuse piles. 816.83 Section... ACTIVITIES § 816.83 Coal mine waste: Refuse piles. Refuse piles shall meet the requirements of § 816.81, the... removed from the disposal area prior to placement of coal mine waste. Topsoil shall be removed, segregated...
30 CFR 817.83 - Coal mine waste: Refuse piles.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Coal mine waste: Refuse piles. 817.83 Section... ACTIVITIES § 817.83 Coal mine waste: Refuse piles. Refuse piles shall meet the requirements of § 817.81, the... removed from the disposal area prior to placement of coal mine waste. Topsoil shall be removed, segregated...
30 CFR 817.83 - Coal mine waste: Refuse piles.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Coal mine waste: Refuse piles. 817.83 Section... ACTIVITIES § 817.83 Coal mine waste: Refuse piles. Refuse piles shall meet the requirements of § 817.81, the... removed from the disposal area prior to placement of coal mine waste. Topsoil shall be removed, segregated...
30 CFR 77.209 - Surge and storage piles.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Surge and storage piles. 77.209 Section 77.209... Installations § 77.209 Surge and storage piles. No person shall be permitted to walk or stand immediately above a reclaiming area or in any other area at or near a surge or storage pile where the reclaiming...
30 CFR 77.209 - Surge and storage piles.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Surge and storage piles. 77.209 Section 77.209... Installations § 77.209 Surge and storage piles. No person shall be permitted to walk or stand immediately above a reclaiming area or in any other area at or near a surge or storage pile where the reclaiming...
36 CFR 221.3 - Disposal of national forest timber according to management plans.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 36 Parks, Forests, and Public Property 2 2010-07-01 2010-07-01 false Disposal of national forest timber according to management plans. 221.3 Section 221.3 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE TIMBER MANAGEMENT PLANNING § 221.3 Disposal of national forest timber...
T-section glulam timber bridge modules : modeling and performance
Paul A. Morgan; Steven E. Taylor; Michael A. Ritter; John M. Franklin
1999-01-01
This paper describes the design, modeling, and testing of two portable timber bridges, each consisting of two noninterconnected longitudinal glued-laminated timber (glulam) deck panels 1.8 m (6 ft) wide. One bridge is 12.2 m (40 ft) long while the other bridge is 10.7 m (35 ft) long. The deck panels are fabricated in a unique double-tee cross section. The bridges...
Nondestructive methods of evaluating quality of wood in preservative-treated piles
Xiping Wang; Robert J. Ross; John R. Erickson; John W. Forsman; Gary D. McGinnis; Rodney C. De Groot
2000-01-01
Stress-wave-based nondestructive evaluation methods were used to evaluate the potential quality and modulus of elasticity (MOE) of wood in used preservative-treated Douglas-fir and southern pine piles. Stress wave measurements were conducted on each pile section. Stress wave propagation speeds in the piles were then obtained to estimate their MOE. This was followed by...
NASA Astrophysics Data System (ADS)
Kaneda, Shogo; Hayashi, Kazuhiro; Hachimori, Wataru; Tamura, Shuji; Saito, Taiki
2017-10-01
In past earthquake disasters, numerous building structure piles were damaged by soil liquefaction occurring during the earthquake. Damage to these piles, because they are underground, is difficult to find. The authors aim to develop a monitoring method of pile damage based on superstructure dynamic response. This paper investigated the relationship between the damage of large cross section cementitious piles and the dynamic response of the super structure using a centrifuge test apparatus. A dynamic specimen used simple cross section pile models consisting of aluminum rod and mortar, a saturated soil (Toyoura sand) of a relative density of 40% and a super structure model of a natural period of 0.63sec. In the shaking table test under a 50G field (length scale of 1/50), excitation was a total of 3 motions scaled from the Rinkai wave at different amplitudes. The maximum acceleration of each of the excitations was 602gal, 336gal and 299gal. The centrifuge test demonstrated the liquefaction of saturated soil and the failure behavior of piles. In the test result, the damage of piles affected the predominant period of acceleration response spectrum on the footing of the superstructure.
43 CFR 1815.1 - Timber sale contracts.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false Timber sale contracts. 1815.1 Section 1815.1 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT....1 Timber sale contracts. ...
43 CFR 1815.1 - Timber sale contracts.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false Timber sale contracts. 1815.1 Section 1815.1 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT....1 Timber sale contracts. ...
43 CFR 1815.1 - Timber sale contracts.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false Timber sale contracts. 1815.1 Section 1815.1 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT....1 Timber sale contracts. ...
Code of Federal Regulations, 2010 CFR
2010-07-01
... importation of any round log or timber product originating in Liberia authorized. 593.510 Section 593.510... importation of any round log or timber product originating in Liberia authorized. Except as otherwise... into the United States of any round log or timber product originating in Liberia are authorized. ...
Code of Federal Regulations, 2012 CFR
2012-07-01
... importation of any round log or timber product originating in Liberia authorized. 593.510 Section 593.510... importation of any round log or timber product originating in Liberia authorized. Except as otherwise... into the United States of any round log or timber product originating in Liberia are authorized. ...
36 CFR 223.85 - Noncompetitive sale of timber.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 36 Parks, Forests, and Public Property 2 2013-07-01 2013-07-01 false Noncompetitive sale of timber. 223.85 Section 223.85 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL...
36 CFR 223.32 - Timber sale operating plan.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 36 Parks, Forests, and Public Property 2 2013-07-01 2013-07-01 false Timber sale operating plan. 223.32 Section 223.32 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL...
36 CFR 223.32 - Timber sale operating plan.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 36 Parks, Forests, and Public Property 2 2011-07-01 2011-07-01 false Timber sale operating plan. 223.32 Section 223.32 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL...
36 CFR 223.32 - Timber sale operating plan.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 36 Parks, Forests, and Public Property 2 2012-07-01 2012-07-01 false Timber sale operating plan. 223.32 Section 223.32 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL...
36 CFR 223.32 - Timber sale operating plan.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 36 Parks, Forests, and Public Property 2 2014-07-01 2014-07-01 false Timber sale operating plan. 223.32 Section 223.32 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL...
36 CFR 223.85 - Noncompetitive sale of timber.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 36 Parks, Forests, and Public Property 2 2014-07-01 2014-07-01 false Noncompetitive sale of timber. 223.85 Section 223.85 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL...
36 CFR 223.85 - Noncompetitive sale of timber.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 36 Parks, Forests, and Public Property 2 2012-07-01 2012-07-01 false Noncompetitive sale of timber. 223.85 Section 223.85 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL...
36 CFR 223.188 - Prohibitions against exporting unprocessed Federal timber.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 36 Parks, Forests, and Public Property 2 2013-07-01 2013-07-01 false Prohibitions against exporting unprocessed Federal timber. 223.188 Section 223.188 Parks, Forests, and Public Property FOREST... Program § 223.188 Prohibitions against exporting unprocessed Federal timber. No person who acquires...
36 CFR 223.188 - Prohibitions against exporting unprocessed Federal timber.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 36 Parks, Forests, and Public Property 2 2012-07-01 2012-07-01 false Prohibitions against exporting unprocessed Federal timber. 223.188 Section 223.188 Parks, Forests, and Public Property FOREST... Program § 223.188 Prohibitions against exporting unprocessed Federal timber. No person who acquires...
36 CFR 223.188 - Prohibitions against exporting unprocessed Federal timber.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 36 Parks, Forests, and Public Property 2 2011-07-01 2011-07-01 false Prohibitions against exporting unprocessed Federal timber. 223.188 Section 223.188 Parks, Forests, and Public Property FOREST... Program § 223.188 Prohibitions against exporting unprocessed Federal timber. No person who acquires...
36 CFR 223.188 - Prohibitions against exporting unprocessed Federal timber.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 36 Parks, Forests, and Public Property 2 2014-07-01 2014-07-01 false Prohibitions against exporting unprocessed Federal timber. 223.188 Section 223.188 Parks, Forests, and Public Property FOREST... Program § 223.188 Prohibitions against exporting unprocessed Federal timber. No person who acquires...
40 CFR 265.251 - Protection from wind.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 26 2014-07-01 2014-07-01 false Protection from wind. 265.251 Section... FACILITIES Waste Piles § 265.251 Protection from wind. The owner or operator of a pile containing hazardous waste which could be subject to dispersal by wind must cover or otherwise manage the pile so that wind...
40 CFR 265.251 - Protection from wind.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 27 2012-07-01 2012-07-01 false Protection from wind. 265.251 Section... FACILITIES Waste Piles § 265.251 Protection from wind. The owner or operator of a pile containing hazardous waste which could be subject to dispersal by wind must cover or otherwise manage the pile so that wind...
40 CFR 265.251 - Protection from wind.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 27 2013-07-01 2013-07-01 false Protection from wind. 265.251 Section... FACILITIES Waste Piles § 265.251 Protection from wind. The owner or operator of a pile containing hazardous waste which could be subject to dispersal by wind must cover or otherwise manage the pile so that wind...
16 CFR 300.26 - Pile fabrics and products composed thereof.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 16 Commercial Practices 1 2011-01-01 2011-01-01 false Pile fabrics and products composed thereof. 300.26 Section 300.26 Commercial Practices FEDERAL TRADE COMMISSION REGULATIONS UNDER SPECIFIC ACTS OF CONGRESS RULES AND REGULATIONS UNDER THE WOOL PRODUCTS LABELING ACT OF 1939 Labeling § 300.26 Pile fabrics...
40 CFR 265.251 - Protection from wind.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 26 2011-07-01 2011-07-01 false Protection from wind. 265.251 Section... FACILITIES Waste Piles § 265.251 Protection from wind. The owner or operator of a pile containing hazardous waste which could be subject to dispersal by wind must cover or otherwise manage the pile so that wind...
40 CFR 265.251 - Protection from wind.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Protection from wind. 265.251 Section... FACILITIES Waste Piles § 265.251 Protection from wind. The owner or operator of a pile containing hazardous waste which could be subject to dispersal by wind must cover or otherwise manage the pile so that wind...
36 CFR 223.62 - Timber purchaser road construction credit.
Code of Federal Regulations, 2010 CFR
2010-07-01
... deposits for slash disposal and road maintenance. As used in this section estimated construction costs... 36 Parks, Forests, and Public Property 2 2010-07-01 2010-07-01 false Timber purchaser road... § 223.62 Timber purchaser road construction credit. Appraisal may also establish stumpage value as if...
Code of Federal Regulations, 2010 CFR
2010-04-01
...; capital assets; timber, coal, and iron ore; involuntary conversion. 404.1084 Section 404.1084 Employees' Benefits SOCIAL SECURITY ADMINISTRATION FEDERAL OLD-AGE, SURVIVORS AND DISABILITY INSURANCE (1950... from disposition of property; capital assets; timber, coal, and iron ore; involuntary conversion. (a...
36 CFR 223.62 - Timber purchaser road construction credit.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 36 Parks, Forests, and Public Property 2 2012-07-01 2012-07-01 false Timber purchaser road construction credit. 223.62 Section 223.62 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL...
36 CFR 223.62 - Timber purchaser road construction credit.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 36 Parks, Forests, and Public Property 2 2011-07-01 2011-07-01 false Timber purchaser road construction credit. 223.62 Section 223.62 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL...
36 CFR 223.62 - Timber purchaser road construction credit.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 36 Parks, Forests, and Public Property 2 2013-07-01 2013-07-01 false Timber purchaser road construction credit. 223.62 Section 223.62 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL...
36 CFR 223.62 - Timber purchaser road construction credit.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 36 Parks, Forests, and Public Property 2 2014-07-01 2014-07-01 false Timber purchaser road construction credit. 223.62 Section 223.62 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL...
43 CFR 9269.3-5 - Timber management.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false Timber management. 9269.3-5 Section 9269.3-5 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT... Timber management. (a) Sales of forest products; general. [Reserved] (b) Non-sale disposals; general—(1...
43 CFR 9269.3-5 - Timber management.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false Timber management. 9269.3-5 Section 9269.3-5 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT... Timber management. (a) Sales of forest products; general. [Reserved] (b) Non-sale disposals; general—(1...
43 CFR 9269.3-5 - Timber management.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Timber management. 9269.3-5 Section 9269.3-5 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT... Timber management. (a) Sales of forest products; general. [Reserved] (b) Non-sale disposals; general—(1...
43 CFR 9269.3-5 - Timber management.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false Timber management. 9269.3-5 Section 9269.3-5 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT... Timber management. (a) Sales of forest products; general. [Reserved] (b) Non-sale disposals; general—(1...
36 CFR 223.85 - Noncompetitive sale of timber.
Code of Federal Regulations, 2011 CFR
2011-07-01
... SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL...). Notwithstanding the provisions of paragraph (a) of this section or any other regulation in this part, for timber... any other regulation in this part, when such extraordinary conditions exist on sales not addressed in...
36 CFR 223.14 - Where timber may be cut.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 36 Parks, Forests, and Public Property 2 2013-07-01 2013-07-01 false Where timber may be cut. 223.14 Section 223.14 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS...
36 CFR 223.1 - Authority to sell timber.
Code of Federal Regulations, 2011 CFR
2011-07-01
... General Provisions § 223.1 Authority to sell timber. Trees, portions of trees, and other forest products... 36 Parks, Forests, and Public Property 2 2011-07-01 2011-07-01 false Authority to sell timber. 223.1 Section 223.1 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE...
36 CFR 223.1 - Authority to sell timber.
Code of Federal Regulations, 2013 CFR
2013-07-01
... General Provisions § 223.1 Authority to sell timber. Trees, portions of trees, and other forest products... 36 Parks, Forests, and Public Property 2 2013-07-01 2013-07-01 false Authority to sell timber. 223.1 Section 223.1 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE...
36 CFR 223.1 - Authority to sell timber.
Code of Federal Regulations, 2012 CFR
2012-07-01
... General Provisions § 223.1 Authority to sell timber. Trees, portions of trees, and other forest products... 36 Parks, Forests, and Public Property 2 2012-07-01 2012-07-01 false Authority to sell timber. 223.1 Section 223.1 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE...
36 CFR 223.14 - Where timber may be cut.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 36 Parks, Forests, and Public Property 2 2011-07-01 2011-07-01 false Where timber may be cut. 223.14 Section 223.14 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS...
36 CFR 223.1 - Authority to sell timber.
Code of Federal Regulations, 2014 CFR
2014-07-01
... General Provisions § 223.1 Authority to sell timber. Trees, portions of trees, and other forest products... 36 Parks, Forests, and Public Property 2 2014-07-01 2014-07-01 false Authority to sell timber. 223.1 Section 223.1 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE...
36 CFR 223.14 - Where timber may be cut.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 36 Parks, Forests, and Public Property 2 2012-07-01 2012-07-01 false Where timber may be cut. 223.14 Section 223.14 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS...
36 CFR 223.14 - Where timber may be cut.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 36 Parks, Forests, and Public Property 2 2014-07-01 2014-07-01 false Where timber may be cut. 223.14 Section 223.14 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS...
36 CFR 223.201 - Limitations on unprocessed timber harvested in Alaska.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 36 Parks, Forests, and Public Property 2 2011-07-01 2011-07-01 false Limitations on unprocessed timber harvested in Alaska. 223.201 Section 223.201 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND...
NASA Astrophysics Data System (ADS)
Uno, Kunihiko; Otsuka, Hisanori; Mitou, Masaaki
The pile foundation is heavily damaged at the boundary division of the ground types, liquefied ground and non-liquefied ground, during an earthquake and there is a possibility of the collapse of the piles. In this study, we conduct a shaking table test and effective stress analysis of the influence of soil liquefaction and the seismic inertial force exerted on the pile foundation. When the intermediate part of the pile, there is at the boundary division, is subjected to section force, this part increases in size as compared to the pile head in certain instances. Further, we develop a seismic resistance method for a pile foundation in liquefaction using seismic isolation rubber and it is shown the middle part seismic isolation system is very effective.
36 CFR 219.11 - Timber requirements based on the NFMA.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 36 Parks, Forests, and Public Property 2 2012-07-01 2012-07-01 false Timber requirements based on the NFMA. 219.11 Section 219.11 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE PLANNING National Forest System Land Management Planning § 219.11 Timber requirements based on the...
36 CFR 223.6 - Cutting and removal of timber in free-use areas.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 36 Parks, Forests, and Public Property 2 2012-07-01 2012-07-01 false Cutting and removal of timber in free-use areas. 223.6 Section 223.6 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND...
36 CFR 223.6 - Cutting and removal of timber in free-use areas.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 36 Parks, Forests, and Public Property 2 2014-07-01 2014-07-01 false Cutting and removal of timber in free-use areas. 223.6 Section 223.6 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND...
36 CFR 223.6 - Cutting and removal of timber in free-use areas.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 36 Parks, Forests, and Public Property 2 2011-07-01 2011-07-01 false Cutting and removal of timber in free-use areas. 223.6 Section 223.6 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND...
36 CFR 223.6 - Cutting and removal of timber in free-use areas.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 36 Parks, Forests, and Public Property 2 2013-07-01 2013-07-01 false Cutting and removal of timber in free-use areas. 223.6 Section 223.6 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND...
36 CFR 219.11 - Timber requirements based on the NFMA.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 36 Parks, Forests, and Public Property 2 2014-07-01 2014-07-01 false Timber requirements based on the NFMA. 219.11 Section 219.11 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE PLANNING National Forest System Land Management Planning § 219.11 Timber requirements based on the...
36 CFR 219.11 - Timber requirements based on the NFMA.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 36 Parks, Forests, and Public Property 2 2013-07-01 2013-07-01 false Timber requirements based on the NFMA. 219.11 Section 219.11 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE PLANNING National Forest System Land Management Planning § 219.11 Timber requirements based on the...
Timber growth, mortality, and change
Roger C. Conner; Michael T. Thompson
2009-01-01
The previous section discussed trends in timber volume. Changes in volume often result from land-use change; that is, land entering or removed from the timber base. On those acres remaining forested, tree growth and mortality are the primary factors for volume change. Annual rates of growth and mortality often differ by species group, ownership, and geographic region....
Numerical Simulation by using Soldiers Pile of the Embankment on Semarang-Solo Highway
NASA Astrophysics Data System (ADS)
Tumanduk, M. S. S. S.; Maki, T. S.; Pangkey, T. U. Y.; Pandeiroth, Y. C.
2018-02-01
Semarang-Solo highway works section II Gedawang-Penggaron constitutes a labile area. It is thought to be effect of the existence of coat clay shale which have moulded. For the purpose of anticipating the embankment mass movement it is placed line bored pile and stringed up (soldiers pile). The objective of this research is to know the efficient use of soldier’s pile of the embankment on Semarang-Solo highway section II Gedawang-Penggaron pursuant based upon numerical simulation. The result of analysis depicts that original slope in a stabil state with horizontal displacement which equal to 0.06 m and safety factor (SF) which equal to 1.31. The strengthened embankment with bored pile is not effective to give am SF improvement at slope so that, at this phase, the slope cannot be slid to be safe enough from landslide namely with horizontal displacement which equal to 0.20 m and SF which equal to 1.09. The effect of traffic load horizontal displacement is which equal to 0.21 m with SF which equal to 1.00. The earthquake simulation results horizontal displacement which equal to 0.75 m with SF which equal to 1.00. Long variation of bored pile of phase II by neglecting bored pile phase III at the depth 35 m yields horizontal displacement which equal to 0.03 m and SF optimum which equal to 2.17. The variation of pile location by placing bored pile under embankment slope foot with distance from the location of bored pile of phase II which equal to 20 m without changing the profile of the existing bored pile creates the horizontal displacement which equals to 0.02 m with SF which equal to 2.29. The result of the horizontal displacement and SF of the two alternative is safer compared to the existing condition (SF>1.5).
Code of Federal Regulations, 2011 CFR
2011-07-01
..., clinker coolers, raw material dryers, and open clinker piles? 63.1343 Section 63.1343 Protection of... What standards apply to my kilns, clinker coolers, raw material dryers, and open clinker piles? (a..., clinker cooler, and raw material dryer. All dioxin D/F, HCl, and total hydrocarbon (THC) emission limits...
Nondestructive evaluation of potential quality of creosote-treated piles removed from service
Xiping Wang; Robert J. Ross; John R. Erickson; John W. Forsman; Gary D. McGinnis; Rodney C. De Groot
2001-01-01
Stress-wave-based nondestructive evaluation methods were used to evaluate the potential quality and modulus of elasticity (MOE) of wood from creosote-treated Douglas-fir and southern pine piles removed from service. Stress-wave measurements were conducted on each pile section. Stress-wave propagation speeds were obtained to estimate the MOE of the wood. Tests were then...
Code of Federal Regulations, 2012 CFR
2012-07-01
..., clinker coolers, raw material dryers, and open clinker piles? 63.1343 Section 63.1343 Protection of... What standards apply to my kilns, clinker coolers, raw material dryers, and open clinker piles? (a..., clinker cooler, and raw material dryer. All dioxin D/F, HCl, and total hydrocarbon (THC) emission limits...
Field testing of stiffened deep cement mixing piles under lateral cyclic loading
NASA Astrophysics Data System (ADS)
Raongjant, Werasak; Jing, Meng
2013-06-01
Construction of seaside and underground wall bracing often uses stiffened deep cement mixed columns (SDCM). This research investigates methods used to improve the level of bearing capacity of these SDCM when subjected to cyclic lateral loading via various types of stiffer cores. Eight piles, two deep cement mixed piles and six stiffened deep cement mixing piles with three different types of cores, H shape cross section prestressed concrete, steel pipe, and H-beam steel, were embedded though soft clay into medium-hard clay on site in Thailand. Cyclic horizontal loading was gradually applied until pile failure and the hysteresis loops of lateral load vs. lateral deformation were recorded. The lateral carrying capacities of the SDCM piles with an H-beam steel core increased by 3-4 times that of the DCM piles. This field research clearly shows that using H-beam steel as a stiffer core for SDCM piles is the best method to improve its lateral carrying capacity, ductility and energy dissipation capacity.
Detail section extending from shore. Note the paired support pilings, ...
Detail section extending from shore. Note the paired support pilings, concrete curbs with rectangular openings for drainage, and large-diameter metal pipe suspended under the deck. USS MISSOURI in background - U.S. Naval Base, Pearl Harbor, Gasoline Wharf, Offshore, near the intersection of Hornet Avenue & Curtis Street, Ford Island, Pearl City, Honolulu County, HI
Code of Federal Regulations, 2010 CFR
2010-07-01
... § 644.551 Equal opportunity—sales of timber, embedded sand, gravel, stone, and surplus structures... 32 National Defense 4 2010-07-01 2010-07-01 true Equal opportunity-sales of timber, embedded sand, gravel, stone, and surplus structures. 644.551 Section 644.551 National Defense Department of Defense...
Stress Wave E-Rating of Structural Timber—Size and Moisture Content Effects
Xiping Wang
2013-01-01
The objectives of this study were to investigate the influence of cross sectional size and moisture content on stress wave properties of structural timber in various sizes and evaluate the feasibility of using stress wave method to E-rate timber in green conditions. Four different sizes of Douglas-fir (Pseudotsuga menziesii) square timbers were...
29 CFR 788.8 - “Cruising, surveying, or felling timber.”
Code of Federal Regulations, 2010 CFR
2010-07-01
... 29 Labor 3 2010-07-01 2010-07-01 false âCruising, surveying, or felling timber.â 788.8 Section 788... OPERATIONS IN WHICH NOT MORE THAN EIGHT EMPLOYEES ARE EMPLOYED § 788.8 “Cruising, surveying, or felling... purpose is to estimate and report on the volume of marketable timber. Employees engaged in “surveying...
Measuring Timber Truck Loads With Image Processing In Paper Mills
NASA Astrophysics Data System (ADS)
Silva, M. Santos; Carvalho, Fernando D.; Rodrigues, F. Carvalho; Goncalves, Ana N. R.
1989-04-01
The raw material for the paper industry is wood. To have an exact account of the stock of piled sawn tree trunks every truck load entering the plant's stockyard must be measured as to the amount of wood being brought in. Weighting down the trucks has its own problems, mainly, due to the high capacity of the tree trunks to absorb water. This problem is further enhanced when calculations must be made to arrive at the mass of sawn tree trunks which must go into the process of producing a certain quantity of paper pulp. The method presented here is based on two fixed cameras which take the image of the truck load. One takes a view of the trunks in order to get information on the average length of the tree trunks. The other obtains a side view which is digitised and by just discriminating against a grey level the area covered by the tree trunk cross section is measured. A simple arithmetic operation gives the volume of wood in the trunk. The same computer, a PC, will register the trucks particulars is almost independent of weather the wood is wet or dry and it serves trucks of any size.
NASA Astrophysics Data System (ADS)
García, Francisco; Ramirez, Manuel; Benlloch, Javier; Valls, Ana
2015-04-01
This paper describes the decision-making process for the timber beam inner reinforcement of the building The Lonja de la Seda de Valencia (15th c.), Spain. This research was based on the study of 13 timber beams for their diagnosis and the characterization before decision-making in structural reinforcement. For this purpose, we integrated the results of analysis of historical documentation, in situ visual inspection and ground penetrating radar (GPR). The rehabilitation project considered the substitution of the upper-storey floor (The Consulate of the Sea Hall) for another one that complied with the original. This room was closed due to the instability of the timber beams. For the flooring renovation it was necessary to increase the rigidity of the timber floor framing. Preliminary conclusions, which derived from the historical documentation and in situ visual inspection of the timber coffered ceiling were: (a) timber beams supported inside masonry walls could suffer moisture and xylophage attacks, (b) timber beams were significantly damaged (splits, ring shakes, failure of beam section that reduced its bearing capacity), (c) substantial timber beam warping. So the main objectives of this GPR study were: to detect splits, to identify failure of section due to biological attacks, to pinpoint epoxy resin reconstructions and to assess the severity of the damages observed on surface. A GPR survey was carried out in timber coffered-ceiling beams of The Consulate of the Sea Hall. Radar measurements were carried out using a SIR-10H system (GSSI) and a 1.6 GHz ground coupled antenna, due to the timber beam dimensions (0.45 x 0.45 x 8.75 m. A total of 37 longitudinal profiles were collected in the centre of all the beam accessible sides. After radragram processing steps, a number of anomalies were detected in the records, which were analysed. The outcomes derived from this GPR study were taken into account when it came to make decisions in the final restoration project of the timber coffered ceiling elements: timber beams, wooden latticework and floor. The results obtained in this survey are a good example of GPR application in Civil Engineering for timber beam inner reinforcement of a building, establishing technical criteria.
Robert J. Ross; Roy F. Pellerin; Norbert Volny; William W. Salsig; Robert H. Falk
1999-01-01
This guide was prepared to assist inspectors in the use of stress wave timing instruments and the various methods of locating and defining areas of decay in timber bridge members. The first two sections provide (a) background information regarding conventional methods to locate and measure decay in timber bridges and (b) the principles of stress wave nondestructive...
26 CFR 1.631-2 - Gain or loss upon the disposal of timber under cutting contract.
Code of Federal Regulations, 2010 CFR
2010-04-01
... cutting contract. 1.631-2 Section 1.631-2 Internal Revenue INTERNAL REVENUE SERVICE, DEPARTMENT OF THE... loss upon the disposal of timber under cutting contract. (a) In general. (1) If an owner disposes of... deemed to be the date such timber is cut. However, if payment is made to the owner under the contract for...
DOT National Transportation Integrated Search
2015-06-01
The objective of this study is to re-evaluate the adoption, with the objective of potentially extending the utilization of Fy = 50 ksi for : the structural capacity of steel H-piles (AISC HP sections) for bridge foundations. Specific consideration is...
26 CFR 1.631-2 - Gain or loss upon the disposal of timber under cutting contract.
Code of Federal Regulations, 2011 CFR
2011-04-01
... cutting contract. 1.631-2 Section 1.631-2 Internal Revenue INTERNAL REVENUE SERVICE, DEPARTMENT OF THE... loss upon the disposal of timber under cutting contract. (a) In general. (1) If an owner disposes of... regulations thereunder with respect to the allowance for depletion. See paragraph (e)(2) of this section for...
1. West portal of Snowshed 29, contextual view to east, ...
1. West portal of Snowshed 29, contextual view to east, 135mm lens. This is perhaps the last section of timber snowshed on this line. Integral with the east end of Tunnel 41, Snowshed 29 provides protection leading to the west portal of the tunnel. The snowshed today consists of (west to east) 199 feet of timber type T4 shed built in 1954, 365 feet of timber type T7 built in 1954, 85 feet of timber type T1 built in 1951, four feet of timber type T7 built in 1925 concurrent with Tunnel 41, and 41 feet of recent prefabricated concrete panel shed. - Central Pacific Transcontinental Railroad, Tunnel No. 41, Milepost 193.3, Donner, Placer County, CA
Xiping Wang; Ferenc Divos; Crystal Pilon; Brian K. Brashaw; Robert J. Ross; Roy F. Pellerin
2004-01-01
This guide was prepared to assist field foresters in the use of stress wave timing instruments to locate and define areas of decay in standing timber. The first three sections provide background information, the principles of stress wave nondestructive testing, and measurement techniques for stress wave nondestructive testing. The last section is a detailed description...
View southwest, wharf A and timber breakwater, showing sawn off ...
View southwest, wharf A and timber breakwater, showing sawn off section and steel lift tower - U.S. Coast Guard Sandy Hook Station, Western Docking Structure, West of intersection of Canfield Road & Hartshorne Drive, Highlands, Monmouth County, NJ
Pathogen reduction in minimally managed composting of bovine manure.
Millner, Patricia; Ingram, David; Mulbry, Walter; Arikan, Osman A
2014-11-01
Spread of manure pathogens is of considerable concern due to use of manure for land application. In this study, the effects of four static pile treatment options for bovine manure on die-off of a generic Escherichia coli, E. coli O157:H7 surrogate, Salmonella Senftenberg, Salm. Typhimurium, and Listeria monocytogenes were evaluated. Bovine manure spiked with these bacteria were placed in cassettes at the top, middle, and bottom sections of four static pile treatments that reflect minimal changes in pile construction with and without straw. Temperatures were monitored continuously during the 28 day self-heating period. E. coli and salmonellae were reduced from 8 to 9 log10 CFU g(-1) to undetectable levels (<1.77 log10 MPN g(-1)) at 25-30 cm depths within 7 days in all pile sections except for the manure-only pile in which 3-4 logs of reduction were obtained. No L. monocytogenes initially present at 6.62 log10 CFU g(-1) were recovered from straw-amended piles after 14 days, in contrast with manure-only treatment in which this pathogen was recovered even at 28 days. Decline of target bacterial populations corresponded to exposure to temperatures above 45°C for more than 3 days and amendments of manure with straw to increase thermophilic zones. Use of straw to increase aeration, self-heating capacity, and heat retention in manure piles provides producers a minimal management option for composting that enhances pathogen die-off and thereby reduces risk of environmental spread when manure is applied to land. Published by Elsevier Ltd.
William T. Simpson
2005-01-01
To use small-diameter trees effectively as square timbers, we need to be able to estimate the amount of time it takes for these timbers to air-dry. Since experimental data on estimating air-drying time for small-diameter logs have been developed, this study looked at a way to relate that method to square timbers. Drying times were determined for a group of round cross-...
Code of Federal Regulations, 2010 CFR
2010-07-01
... to which emissions reduce the transmission of light and obscure the view of an object in the...: main shale pile (Table 1 of this section, source 2), emergency/contingency raw ore shale pile (Table 1...
40 CFR 264.554 - Staging piles.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 27 2012-07-01 2012-07-01 false Staging piles. 264.554 Section 264.554 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR... environment; and (3) Any additional information the Director determines is necessary to protect human health...
40 CFR 264.554 - Staging piles.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 27 2013-07-01 2013-07-01 false Staging piles. 264.554 Section 264.554 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR... environment; and (3) Any additional information the Director determines is necessary to protect human health...
40 CFR 264.554 - Staging piles.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 26 2011-07-01 2011-07-01 false Staging piles. 264.554 Section 264.554 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR... environment; and (3) Any additional information the Director determines is necessary to protect human health...
40 CFR 264.554 - Staging piles.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 26 2014-07-01 2014-07-01 false Staging piles. 264.554 Section 264.554 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR... environment; and (3) Any additional information the Director determines is necessary to protect human health...
Fixation effects on the release of copper, chromium and arsenic from CCA-C treated marine piles
Stan Lebow
1999-01-01
This study sought to determine the effect of fixation time and temperature on the release of copper, chromium and arsenic from treated marine piles immersed in seawater under "worst case" conditions. Sections of piles were CCA-C treated to a target retention of 2.5 lbs/ft3) (40 kg/m3) and then allowed to Condition at 36°F (2°C) for either 3, 7 or 20 days. As...
29 CFR 1926.1439 - Dedicated pile drivers.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 29 Labor 8 2011-07-01 2011-07-01 false Dedicated pile drivers. 1926.1439 Section 1926.1439 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Cranes and Derricks in Construction § 1926.1439...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schenian, P.A.
1995-07-01
In June and July 1995, the Fort Knox Contract Staff Archaeologist conducted a Phase I archaeological survey of proposed timber harvest areas in Training Areas 8, 13, and 14 on the Fort Knox Military Reservation, Hardin and Meade Counties, Kentucky. The timber areas consist of five small, disjoint project areas encompassing a total of 11 acres (4.4 ha). The trees to be harvested had been marked by the forestry section prior to the survey. All timber areas were walked in their entirety. No evidence of archaeological sites was found in this study. It is recommended that the timber harvesting bemore » conducted as proposed.« less
36 CFR 223.116 - Cancellation.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 36 Parks, Forests, and Public Property 2 2013-07-01 2013-07-01 false Cancellation. 223.116 Section 223.116 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS Timber...
Code of Federal Regulations, 2011 CFR
2011-07-01
... 36 Parks, Forests, and Public Property 2 2011-07-01 2011-07-01 false [Reserved] 223.163 Section 223.163 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS Timber...
36 CFR 223.116 - Cancellation.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 36 Parks, Forests, and Public Property 2 2012-07-01 2012-07-01 false Cancellation. 223.116 Section 223.116 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS Timber...
Code of Federal Regulations, 2011 CFR
2011-07-01
... 36 Parks, Forests, and Public Property 2 2011-07-01 2011-07-01 false [Reserved] 223.161 Section 223.161 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS Timber...
Code of Federal Regulations, 2013 CFR
2013-07-01
... 36 Parks, Forests, and Public Property 2 2013-07-01 2013-07-01 false [Reserved] 223.163 Section 223.163 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS Timber...
Code of Federal Regulations, 2013 CFR
2013-07-01
... 36 Parks, Forests, and Public Property 2 2013-07-01 2013-07-01 false [Reserved] 223.161 Section 223.161 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS Timber...
Code of Federal Regulations, 2014 CFR
2014-07-01
... 36 Parks, Forests, and Public Property 2 2014-07-01 2014-07-01 false [Reserved] 223.163 Section 223.163 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS Timber...
Code of Federal Regulations, 2012 CFR
2012-07-01
... 36 Parks, Forests, and Public Property 2 2012-07-01 2012-07-01 false [Reserved] 223.163 Section 223.163 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS Timber...
Code of Federal Regulations, 2012 CFR
2012-07-01
... 36 Parks, Forests, and Public Property 2 2012-07-01 2012-07-01 false [Reserved] 223.161 Section 223.161 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS Timber...
36 CFR 223.116 - Cancellation.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 36 Parks, Forests, and Public Property 2 2014-07-01 2014-07-01 false Cancellation. 223.116 Section 223.116 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS Timber...
Code of Federal Regulations, 2012 CFR
2012-07-01
... 36 Parks, Forests, and Public Property 2 2012-07-01 2012-07-01 false Definitions. 223.160 Section 223.160 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS Timber...
Code of Federal Regulations, 2013 CFR
2013-07-01
... 36 Parks, Forests, and Public Property 2 2013-07-01 2013-07-01 false Definitions. 223.160 Section 223.160 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS Timber...
Code of Federal Regulations, 2014 CFR
2014-07-01
... 36 Parks, Forests, and Public Property 2 2014-07-01 2014-07-01 false Definitions. 223.160 Section 223.160 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS Timber...
Code of Federal Regulations, 2011 CFR
2011-07-01
... 36 Parks, Forests, and Public Property 2 2011-07-01 2011-07-01 false Definitions. 223.160 Section 223.160 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS Timber...
36 CFR 223.115 - Contract extensions.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Section 223.115 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER Timber Sale Contracts Contract Administration § 223.115 Contract...) That the purchaser has diligently performed in accordance with contract provisions and an approved plan...
A Profile of Wood Use in Nonresidential Building Construction.
1985-06-01
This includes both conventional glued- laminated timbers (glulam) and lumber in glued * Lumber (board, dimension, timbers , trussed, wood-plywood...members of built-up cross sections laminated , fire-retardant-treated) (wood I-beams). Greatest concentrations of use are in stores where 58 million board...remaining volumes (fig. 3). 5 7,7 6 Ir w Exterior wals Board Trussed Dimension and Timbers Laminated Percent "lorfrmigOffices 23 4ff-’£15.4 Fl or framing
30 CFR 715.14 - Backfilling and grading.
Code of Federal Regulations, 2012 CFR
2012-07-01
... grade all spoil material to eliminate all highwalls, spoil piles, and depressions. Cut-and-fill terraces... approximate original contour, all highwalls, spoil piles, and depressions except as provided in paragraphs (d... the provisions of § 716.3 of this chapter. (d) Small depressions. The requirement of this section to...
30 CFR 715.14 - Backfilling and grading.
Code of Federal Regulations, 2013 CFR
2013-07-01
... grade all spoil material to eliminate all highwalls, spoil piles, and depressions. Cut-and-fill terraces... approximate original contour, all highwalls, spoil piles, and depressions except as provided in paragraphs (d... the provisions of § 716.3 of this chapter. (d) Small depressions. The requirement of this section to...
30 CFR 715.14 - Backfilling and grading.
Code of Federal Regulations, 2014 CFR
2014-07-01
... grade all spoil material to eliminate all highwalls, spoil piles, and depressions. Cut-and-fill terraces... approximate original contour, all highwalls, spoil piles, and depressions except as provided in paragraphs (d... the provisions of § 716.3 of this chapter. (d) Small depressions. The requirement of this section to...
36 CFR 223.115 - Contract extensions.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 36 Parks, Forests, and Public Property 2 2012-07-01 2012-07-01 false Contract extensions. 223.115 Section 223.115 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS Timber...
36 CFR 223.35 - Performance bond.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 36 Parks, Forests, and Public Property 2 2012-07-01 2012-07-01 false Performance bond. 223.35 Section 223.35 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS Timber...
36 CFR 223.34 - Advance payment.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 36 Parks, Forests, and Public Property 2 2012-07-01 2012-07-01 false Advance payment. 223.34 Section 223.34 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS Timber...
Code of Federal Regulations, 2014 CFR
2014-07-01
... 36 Parks, Forests, and Public Property 2 2014-07-01 2014-07-01 false [Reserved] 223.39 Section 223.39 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS Timber Sale Contracts...
36 CFR 223.51 - Bid monitoring.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 36 Parks, Forests, and Public Property 2 2014-07-01 2014-07-01 false Bid monitoring. 223.51 Section 223.51 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS Timber...
36 CFR 223.115 - Contract extensions.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 36 Parks, Forests, and Public Property 2 2011-07-01 2011-07-01 false Contract extensions. 223.115 Section 223.115 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS Timber...
36 CFR 223.51 - Bid monitoring.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 36 Parks, Forests, and Public Property 2 2011-07-01 2011-07-01 false Bid monitoring. 223.51 Section 223.51 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS Timber...
36 CFR 223.51 - Bid monitoring.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 36 Parks, Forests, and Public Property 2 2013-07-01 2013-07-01 false Bid monitoring. 223.51 Section 223.51 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS Timber...
Code of Federal Regulations, 2011 CFR
2011-07-01
... 36 Parks, Forests, and Public Property 2 2011-07-01 2011-07-01 false [Reserved] 223.66 Section 223.66 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS Timber Sale Contracts...
36 CFR 223.34 - Advance payment.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 36 Parks, Forests, and Public Property 2 2011-07-01 2011-07-01 false Advance payment. 223.34 Section 223.34 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS Timber...
Code of Federal Regulations, 2012 CFR
2012-07-01
... 36 Parks, Forests, and Public Property 2 2012-07-01 2012-07-01 false [Reserved] 223.39 Section 223.39 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS Timber Sale Contracts...
Code of Federal Regulations, 2014 CFR
2014-07-01
... 36 Parks, Forests, and Public Property 2 2014-07-01 2014-07-01 false [Reserved] 223.66 Section 223.66 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS Timber Sale Contracts...
36 CFR 223.115 - Contract extensions.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 36 Parks, Forests, and Public Property 2 2013-07-01 2013-07-01 false Contract extensions. 223.115 Section 223.115 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS Timber...
36 CFR 223.51 - Bid monitoring.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 36 Parks, Forests, and Public Property 2 2012-07-01 2012-07-01 false Bid monitoring. 223.51 Section 223.51 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS Timber...
36 CFR 223.34 - Advance payment.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 36 Parks, Forests, and Public Property 2 2014-07-01 2014-07-01 false Advance payment. 223.34 Section 223.34 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS Timber...
Code of Federal Regulations, 2013 CFR
2013-07-01
... 36 Parks, Forests, and Public Property 2 2013-07-01 2013-07-01 false [Reserved] 223.66 Section 223.66 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS Timber Sale Contracts...
Code of Federal Regulations, 2011 CFR
2011-07-01
... 36 Parks, Forests, and Public Property 2 2011-07-01 2011-07-01 false [Reserved] 223.39 Section 223.39 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS Timber Sale Contracts...
36 CFR 223.115 - Contract extensions.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 36 Parks, Forests, and Public Property 2 2014-07-01 2014-07-01 false Contract extensions. 223.115 Section 223.115 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS Timber...
Code of Federal Regulations, 2013 CFR
2013-07-01
... 36 Parks, Forests, and Public Property 2 2013-07-01 2013-07-01 false [Reserved] 223.39 Section 223.39 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS Timber Sale Contracts...
36 CFR 223.34 - Advance payment.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 36 Parks, Forests, and Public Property 2 2013-07-01 2013-07-01 false Advance payment. 223.34 Section 223.34 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS Timber...
Code of Federal Regulations, 2012 CFR
2012-07-01
... 36 Parks, Forests, and Public Property 2 2012-07-01 2012-07-01 false [Reserved] 223.66 Section 223.66 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS Timber Sale Contracts...
36 CFR 223.50 - Periodic payments.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 36 Parks, Forests, and Public Property 2 2011-07-01 2011-07-01 false Periodic payments. 223.50 Section 223.50 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS Timber...
Code of Federal Regulations, 2014 CFR
2014-07-01
... 36 Parks, Forests, and Public Property 2 2014-07-01 2014-07-01 false Downpayments. 223.49 Section 223.49 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS Timber Sale...
36 CFR 223.50 - Periodic payments.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 36 Parks, Forests, and Public Property 2 2013-07-01 2013-07-01 false Periodic payments. 223.50 Section 223.50 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS Timber...
Code of Federal Regulations, 2012 CFR
2012-07-01
... 36 Parks, Forests, and Public Property 2 2012-07-01 2012-07-01 false Downpayments. 223.49 Section 223.49 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS Timber Sale...
Code of Federal Regulations, 2013 CFR
2013-07-01
... 36 Parks, Forests, and Public Property 2 2013-07-01 2013-07-01 false Downpayments. 223.49 Section 223.49 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS Timber Sale...
36 CFR 223.50 - Periodic payments.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 36 Parks, Forests, and Public Property 2 2014-07-01 2014-07-01 false Periodic payments. 223.50 Section 223.50 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS Timber...
36 CFR 223.50 - Periodic payments.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 36 Parks, Forests, and Public Property 2 2012-07-01 2012-07-01 false Periodic payments. 223.50 Section 223.50 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS Timber...
DOT National Transportation Integrated Search
1995-05-01
The Oregon Department of Transportation (ODOT) installed a two-rail steel-backed timber guardrail along a section of the Historic Columbia River Highway, formerly known as the Crown Point Highway, in March 1992 as an experimental features project. Th...
Technical activities report: Heat, water, and mechanical studies
DOE Office of Scientific and Technical Information (OSTI.GOV)
Alexander, W.K.
1951-10-04
Topics in the heat studies section include: front and rear face reflector shields at the C-pile; process tube channel thermocouples; water temperature limits for horizontal rods; slug temperature and thermal conductivity calculations; maximum slug-end cap temperature; boiling consideration studies; scram time limit for Panellit alarm; heat transfer test; slug stresses; thermal insulation of bottom tube row at C-pile; flow tests; present pile enrichment; electric analog; and measurement of thermal contact resistance. Topics in the water studies section include: 100-D flow laboratory; process water studies; fundamental studies on film formation; coatings on tip-offs; can difference tests; slug jacket abrasion at highmore » flow rates; corrosion studies; front tube dummy slugs; metallographic examination of tubes from H-pile; fifty-tube mock-up; induction heating facility; operational procedures and standards; vertical safety rod dropping time tests; recirculation; and power recovery. Mechanical development studies include: effect of Sphincter seal and lubricant VSR drop time; slug damage; slug bubble tester; P-13 removal; chemical slug stripper; effect of process tube rib spacing and width; ink facility installation; charging and discharging machines; process tube creep; flapper nozzle assembly test; test of single gun barrel assembly; pigtail fixture test; horizontal rod gland seal test; function test of C-pile; and intermediate test of Ball 3-X and VSR systems.« less
NASA Astrophysics Data System (ADS)
Bergado, D. T.; Long, P. V.; Chaiyaput, S.; Balasubramaniam, A. S.
2018-04-01
Soft ground improvement techniques have become most practical and popular methods to increase soil strength, soil stiffness and reduce soil compressibility including the soft Bangkok clay. This paper focuses on comparative performances of prefabricated vertical drain (PVD) using surcharge, vacuum and heat preloading as well as the cement-admixed clay of Deep Cement Mixing (DCM) and Stiffened DCM (SDCM) methods. The Vacuum-PVD can increase the horizontal coefficient of consolidation, Ch, resulting in faster rate of settlement at the same magnitudes of settlement compared to Conventional PVD. Several field methods of applying vacuum preloading are also compared. Moreover, the Thermal PVD and Thermal Vacuum PVD can increase further the coefficient of horizontal consolidation, Ch, with the associated reduction of kh/ks values by reducing the drainage retardation effects in the smear zone around the PVD which resulted in faster rates of consolidation and higher magnitudes of settlements. Furthermore, the equivalent smear effect due to non-uniform consolidation is also discussed in addition to the smear due to the mechanical installation of PVDs. In addition, a new kind of reinforced deep mixing method, namely Stiffened Deep Cement Mixing (SDCM) pile is introduced to improve the flexural resistance, improve the field quality control, and prevent unexpected failures of the Deep Cement Mixing (DCM) pile. The SDCM pile consists of DCM pile reinforced with the insertion of precast reinforced concrete (RC) core. The full scale test embankment on soft clay improved by SDCM and DCM piles was also analysed. Numerical simulations using the 3D PLAXIS Foundation finite element software have been done to understand the behavior of SDCM and DCM piles. The simulation results indicated that the surface settlements decreased with increasing lengths of the RC cores, and, at lesser extent, increasing sectional areas of the RC cores in the SDCM piles. In addition, the lateral movements decreased by increasing the lengths (longer than 4 m) and, the sectional areas of the RC cores in the SDCM piles. The results of the numerical simulations closely agreed with the observed data and successfully verified the parameters affecting the performances and behavior of both SDCM and DCM piles.
36 CFR 223.83 - Contents of prospectus.
Code of Federal Regulations, 2011 CFR
2011-07-01
....83 Section 223.83 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE... Timber Sale Contracts Advertisement and Bids § 223.83 Contents of prospectus. (a) A timber sale.... (4) The location and area of the sale, including harvest acreage. (5) The estimated volumes, quality...
36 CFR 223.31 - Duration of contracts.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 36 Parks, Forests, and Public Property 2 2014-07-01 2014-07-01 false Duration of contracts. 223.31 Section 223.31 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS Timber...
36 CFR 223.31 - Duration of contracts.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 36 Parks, Forests, and Public Property 2 2011-07-01 2011-07-01 false Duration of contracts. 223.31 Section 223.31 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS Timber...
36 CFR 223.31 - Duration of contracts.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 36 Parks, Forests, and Public Property 2 2012-07-01 2012-07-01 false Duration of contracts. 223.31 Section 223.31 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS Timber...
36 CFR 223.31 - Duration of contracts.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 36 Parks, Forests, and Public Property 2 2013-07-01 2013-07-01 false Duration of contracts. 223.31 Section 223.31 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS Timber...
36 CFR 219.29 - Limitation on timber harvest.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 36 Parks, Forests, and Public Property 2 2010-07-01 2010-07-01 false Limitation on timber harvest. 219.29 Section 219.29 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE PLANNING National Forest System Land and Resource Management Planning Special Considerations § 219.29...
Design method of large-diameter rock-socketed pile with steel casing
NASA Astrophysics Data System (ADS)
Liu, Ming-wei; Fang, Fang; Liang, Yue
2018-02-01
There is a lack of the design and calculation method of large-diameter rock-socketed pile with steel casing. Combined with the “twelfth five-year plan” of the National Science & Technology Pillar Program of China about “Key technologies on the ports and wharfs constructions of the mountain canalization channels”, this paper put forward the structured design requirements of concrete, steel bar distribution and steel casing, and a checking calculation method of the bearing capacity of the normal section of the pile and the maximum crack width at the bottom of the steel casing. The design method will have some degree of guiding significance for the design of large-diameter rock-socketed pile with steel casing.
40 CFR 265.255 - Action leakage rates.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Action leakage rates. 265.255 Section... FACILITIES Waste Piles § 265.255 Action leakage rates. (a) The owner or operator of waste pile units subject to § 265.254 must submit a proposed action leakage rate to the Regional Administrator when submitting...
40 CFR 264.252 - Action leakage rate.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Action leakage rate. 264.252 Section... Piles § 264.252 Action leakage rate. (a) The Regional Administrator shall approve an action leakage rate for waste pile units subject to § 264.251(c) or (d). The action leakage rate is the maximum design...
40 CFR 265.252 - Waste analysis.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 26 2011-07-01 2011-07-01 false Waste analysis. 265.252 Section 265... FACILITIES Waste Piles § 265.252 Waste analysis. In addition to the waste analyses required by § 265.13, the... in the pile to which it is to be added. The analysis conducted must be capable of differentiating...
2003-08-01
connector increased the strength of the joints by spreading the load more equally over the cross section of the wood, and in fact made the "all-wood...strength of the timber joints by spreading the load more equally over the cross section of the wood. The Timber Engineering Company established a...Laboratory Computerized Axial Tomography Columbia Broadcasting System Comprehensive Display System Corps of Engineers Ballistic Missile Construction
36 CFR 223.85 - Noncompetitive sale of timber.
Code of Federal Regulations, 2010 CFR
2010-07-01
... bids but not sold because of lack of bids and any timber on uncut areas included in a contract which... extraordinary conditions exist on sales not addressed in paragraph (b) of this section, the Secretary of... associated with the substitution, including a rate redetermination. Concurrently, both parties will sign an...
43 CFR 9239.1 - Timber and other vegetative resources.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Timber and other vegetative resources. 9239.1 Section 9239.1 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR TECHNICAL SERVICES (9000) TRESPASS Kinds of Trespass § 9239...
43 CFR 9239.1 - Timber and other vegetative resources.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false Timber and other vegetative resources. 9239.1 Section 9239.1 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR TECHNICAL SERVICES (9000) TRESPASS Kinds of Trespass § 9239...
43 CFR 9239.1 - Timber and other vegetative resources.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false Timber and other vegetative resources. 9239.1 Section 9239.1 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR TECHNICAL SERVICES (9000) TRESPASS Kinds of Trespass § 9239...
43 CFR 9239.1 - Timber and other vegetative resources.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false Timber and other vegetative resources. 9239.1 Section 9239.1 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR TECHNICAL SERVICES (9000) TRESPASS Kinds of Trespass § 9239...
36 CFR 223.9 - Free use to owners of certain mining claims.
Code of Federal Regulations, 2012 CFR
2012-07-01
... mining claims. 223.9 Section 223.9 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL... be granted, free of charge, timber from the nearest National Forest land which is ready for...
36 CFR 223.9 - Free use to owners of certain mining claims.
Code of Federal Regulations, 2013 CFR
2013-07-01
... mining claims. 223.9 Section 223.9 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL... be granted, free of charge, timber from the nearest National Forest land which is ready for...
36 CFR 223.9 - Free use to owners of certain mining claims.
Code of Federal Regulations, 2011 CFR
2011-07-01
... mining claims. 223.9 Section 223.9 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL... be granted, free of charge, timber from the nearest National Forest land which is ready for...
36 CFR 223.9 - Free use to owners of certain mining claims.
Code of Federal Regulations, 2014 CFR
2014-07-01
... mining claims. 223.9 Section 223.9 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL... be granted, free of charge, timber from the nearest National Forest land which is ready for...
Code of Federal Regulations, 2012 CFR
2012-07-01
... 36 Parks, Forests, and Public Property 2 2012-07-01 2012-07-01 false Policy. 223.132 Section 223... Debarment of Timber Purchasers § 223.132 Policy. (a) The Forest Service shall solicit and consider timber..., are appropriate means to effectuate this policy. (b) Debarment and suspension shall be imposed only...
36 CFR 223.188 - Prohibitions against exporting unprocessed Federal timber.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 36 Parks, Forests, and Public Property 2 2010-07-01 2010-07-01 false Prohibitions against exporting unprocessed Federal timber. 223.188 Section 223.188 Parks, Forests, and Public Property FOREST... Conservation and Shortage Relief Act of 1990 Program § 223.188 Prohibitions against exporting unprocessed...
36 CFR 223.46 - Adjustment of contract termination date.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 36 Parks, Forests, and Public Property 2 2010-07-01 2010-07-01 false Adjustment of contract termination date. 223.46 Section 223.46 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER Timber Sale Contracts Contract Conditions and...
26 CFR 1.611-5 - Depreciation of improvements.
Code of Federal Regulations, 2011 CFR
2011-04-01
... (CONTINUED) INCOME TAXES (CONTINUED) Natural Resources § 1.611-5 Depreciation of improvements. (a) In general. Section 611 provides in the case of mines, oil and gas wells, other natural deposits, and timber that...). (b) Special rules for mines, oil and gas wells, other natural deposits and timber. (1) For principles...
50 CFR 36.15 - Subsistence uses of timber and plant material.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 50 Wildlife and Fisheries 9 2014-10-01 2014-10-01 false Subsistence uses of timber and plant material. 36.15 Section 36.15 Wildlife and Fisheries UNITED STATES FISH AND WILDLIFE SERVICE, DEPARTMENT OF THE INTERIOR (CONTINUED) THE NATIONAL WILDLIFE REFUGE SYSTEM ALASKA NATIONAL WILDLIFE REFUGES...
50 CFR 36.15 - Subsistence uses of timber and plant material.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false Subsistence uses of timber and plant material. 36.15 Section 36.15 Wildlife and Fisheries UNITED STATES FISH AND WILDLIFE SERVICE, DEPARTMENT OF THE INTERIOR (CONTINUED) THE NATIONAL WILDLIFE REFUGE SYSTEM ALASKA NATIONAL WILDLIFE REFUGES...
50 CFR 36.15 - Subsistence uses of timber and plant material.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 50 Wildlife and Fisheries 8 2011-10-01 2011-10-01 false Subsistence uses of timber and plant material. 36.15 Section 36.15 Wildlife and Fisheries UNITED STATES FISH AND WILDLIFE SERVICE, DEPARTMENT OF THE INTERIOR (CONTINUED) THE NATIONAL WILDLIFE REFUGE SYSTEM ALASKA NATIONAL WILDLIFE REFUGES...
50 CFR 36.15 - Subsistence uses of timber and plant material.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 50 Wildlife and Fisheries 9 2013-10-01 2013-10-01 false Subsistence uses of timber and plant material. 36.15 Section 36.15 Wildlife and Fisheries UNITED STATES FISH AND WILDLIFE SERVICE, DEPARTMENT OF THE INTERIOR (CONTINUED) THE NATIONAL WILDLIFE REFUGE SYSTEM ALASKA NATIONAL WILDLIFE REFUGES...
50 CFR 36.15 - Subsistence uses of timber and plant material.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 50 Wildlife and Fisheries 9 2012-10-01 2012-10-01 false Subsistence uses of timber and plant material. 36.15 Section 36.15 Wildlife and Fisheries UNITED STATES FISH AND WILDLIFE SERVICE, DEPARTMENT OF THE INTERIOR (CONTINUED) THE NATIONAL WILDLIFE REFUGE SYSTEM ALASKA NATIONAL WILDLIFE REFUGES...
31 CFR 593.309 - Round log or timber product.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 31 Money and Finance:Treasury 3 2014-07-01 2014-07-01 false Round log or timber product. 593.309 Section 593.309 Money and Finance: Treasury Regulations Relating to Money and Finance (Continued) OFFICE OF FOREIGN ASSETS CONTROL, DEPARTMENT OF THE TREASURY FORMER LIBERIAN REGIME OF CHARLES TAYLOR...
31 CFR 593.309 - Round log or timber product.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 31 Money and Finance: Treasury 3 2010-07-01 2010-07-01 false Round log or timber product. 593.309 Section 593.309 Money and Finance: Treasury Regulations Relating to Money and Finance (Continued) OFFICE OF FOREIGN ASSETS CONTROL, DEPARTMENT OF THE TREASURY FORMER LIBERIAN REGIME OF CHARLES TAYLOR...
31 CFR 593.309 - Round log or timber product.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 31 Money and Finance:Treasury 3 2012-07-01 2012-07-01 false Round log or timber product. 593.309 Section 593.309 Money and Finance: Treasury Regulations Relating to Money and Finance (Continued) OFFICE OF FOREIGN ASSETS CONTROL, DEPARTMENT OF THE TREASURY FORMER LIBERIAN REGIME OF CHARLES TAYLOR...
31 CFR 593.309 - Round log or timber product.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 31 Money and Finance:Treasury 3 2011-07-01 2011-07-01 false Round log or timber product. 593.309 Section 593.309 Money and Finance: Treasury Regulations Relating to Money and Finance (Continued) OFFICE OF FOREIGN ASSETS CONTROL, DEPARTMENT OF THE TREASURY FORMER LIBERIAN REGIME OF CHARLES TAYLOR...
31 CFR 593.309 - Round log or timber product.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 31 Money and Finance:Treasury 3 2013-07-01 2013-07-01 false Round log or timber product. 593.309 Section 593.309 Money and Finance: Treasury Regulations Relating to Money and Finance (Continued) OFFICE OF FOREIGN ASSETS CONTROL, DEPARTMENT OF THE TREASURY FORMER LIBERIAN REGIME OF CHARLES TAYLOR...
36 CFR 223.135 - Effect of listing.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 36 Parks, Forests, and Public Property 2 2010-07-01 2010-07-01 false Effect of listing. 223.135 Section 223.135 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER Suspension and Debarment of Timber Purchasers § 223.135 Effect of...
Design Methods for Load-bearing Elements from Crosslaminated Timber
NASA Astrophysics Data System (ADS)
Vilguts, A.; Serdjuks, D.; Goremikins, V.
2015-11-01
Cross-laminated timber is an environmentally friendly material, which possesses a decreased level of anisotropy in comparison with the solid and glued timber. Cross-laminated timber could be used for load-bearing walls and slabs of multi-storey timber buildings as well as decking structures of pedestrian and road bridges. Design methods of cross-laminated timber elements subjected to bending and compression with bending were considered. The presented methods were experimentally validated and verified by FEM. Two cross-laminated timber slabs were tested at the action of static load. Pine wood was chosen as a board's material. Freely supported beam with the span equal to 1.9 m, which was loaded by the uniformly distributed load, was a design scheme of the considered plates. The width of the plates was equal to 1 m. The considered cross-laminated timber plates were analysed by FEM method. The comparison of stresses acting in the edge fibres of the plate and the maximum vertical displacements shows that both considered methods can be used for engineering calculations. The difference between the results obtained experimentally and analytically is within the limits from 2 to 31%. The difference in results obtained by effective strength and stiffness and transformed sections methods was not significant.
NASA Astrophysics Data System (ADS)
Tulebekova, S.; Saliyev, D.; Zhang, D.; Kim, J. R.; Karabay, A.; Turlybek, A.; Kazybayeva, L.
2017-11-01
Compressed air energy storage technology is one of the promising methods that have high reliability, economic feasibility and low environmental impact. Current applications of the technology are mainly limited to energy storage for power plants using large scale underground caverns. This paper explores the possibility of making use of reinforced concrete pile foundations to store renewable energy generated from solar panels or windmills attached to building structures. The energy will be stored inside the pile foundation with hollow sections via compressed air. Given the relatively small volume of storage provided by the foundation, the required storage pressure is expected to be higher than that in the large-scale underground cavern. The high air pressure typically associated with large temperature increase, combined with structural loads, will make the pile foundation in a complicated loading condition, which might cause issues in the structural and geotechnical safety. This paper presents a preliminary analytical study on the performance of the pile foundation subjected to high pressure, large temperature increase and structural loads. Finite element analyses on pile foundation models, which are built from selected prototype structures, have been conducted. The analytical study identifies maximum stresses in the concrete of the pile foundation under combined pressure, temperature change and structural loads. Recommendations have been made for the use of reinforced concrete pile foundations for renewable energy storage.
Measurement of Moisture in Wood for Application in the Restoration of Old Buildings.
Moron, Carlos; Garcia-Fuentevilla, Luisa; Garcia, Alfonso; Moron, Alberto
2016-05-14
There are many historic buildings whose construction is based on timber frame walls. Most buildings built during the nineteenth and early twentieth centuries were based on timber frame walls with vertical support elements. These timber frame elements are affected by their moisture content and by the passage of time. If the interaction of the timber frame walls with hygrothermal fluctuations were known, the maintenance of these buildings could be improved significantly. To determine the moisture content of wood there are two types of meters on the market: on the one hand, capacitance meters which consist of two side ends and where the moisture content is measured locally between two peaks. On the other hand, there are meters based on the variation of electromagnetic transmittance of timber, which depends on the moisture of timber. The second ones are very expensive and difficult to handle. This work presents a new non-intrusive capacitive sensor that measures the global moisture content in a section of the timber frame walls and therefore its accuracy is similar to the accuracy that can be obtained with electromagnetic transmittance meters. Additionally, as it is a capacitive sensor, it is low cost and easy to operate.
Measurement of Moisture in Wood for Application in the Restoration of Old Buildings
Moron, Carlos; Garcia-Fuentevilla, Luisa; Garcia, Alfonso; Moron, Alberto
2016-01-01
There are many historic buildings whose construction is based on timber frame walls. Most buildings built during the nineteenth and early twentieth centuries were based on timber frame walls with vertical support elements. These timber frame elements are affected by their moisture content and by the passage of time. If the interaction of the timber frame walls with hygrothermal fluctuations were known, the maintenance of these buildings could be improved significantly. To determine the moisture content of wood there are two types of meters on the market: on the one hand, capacitance meters which consist of two side ends and where the moisture content is measured locally between two peaks. On the other hand, there are meters based on the variation of electromagnetic transmittance of timber, which depends on the moisture of timber. The second ones are very expensive and difficult to handle. This work presents a new non-intrusive capacitive sensor that measures the global moisture content in a section of the timber frame walls and therefore its accuracy is similar to the accuracy that can be obtained with electromagnetic transmittance meters. Additionally, as it is a capacitive sensor, it is low cost and easy to operate. PMID:27187410
36 CFR 223.1 - Authority to sell timber.
Code of Federal Regulations, 2010 CFR
2010-07-01
.... Trees, portions of trees, and other forest products on National Forest System lands may be sold for the... 36 Parks, Forests, and Public Property 2 2010-07-01 2010-07-01 false Authority to sell timber. 223.1 Section 223.1 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE...
36 CFR 223.38 - Standards for road design and construction.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 36 Parks, Forests, and Public Property 2 2014-07-01 2014-07-01 false Standards for road design and construction. 223.38 Section 223.38 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS Timber Sale Contracts...
50 CFR 23.73 - How can I trade internationally in timber?
Code of Federal Regulations, 2014 CFR
2014-10-01
... 50 Wildlife and Fisheries 9 2014-10-01 2014-10-01 false How can I trade internationally in timber? 23.73 Section 23.73 Wildlife and Fisheries UNITED STATES FISH AND WILDLIFE SERVICE, DEPARTMENT OF THE INTERIOR (CONTINUED) TAKING, POSSESSION, TRANSPORTATION, SALE, PURCHASE, BARTER, EXPORTATION, AND IMPORTATION OF WILDLIFE AND PLANTS (CONTINUED)...
50 CFR 23.73 - How can I trade internationally in timber?
Code of Federal Regulations, 2013 CFR
2013-10-01
... 50 Wildlife and Fisheries 9 2013-10-01 2013-10-01 false How can I trade internationally in timber? 23.73 Section 23.73 Wildlife and Fisheries UNITED STATES FISH AND WILDLIFE SERVICE, DEPARTMENT OF THE INTERIOR (CONTINUED) TAKING, POSSESSION, TRANSPORTATION, SALE, PURCHASE, BARTER, EXPORTATION, AND IMPORTATION OF WILDLIFE AND PLANTS (CONTINUED)...
Code of Federal Regulations, 2014 CFR
2014-01-01
... 7 Agriculture 11 2014-01-01 2014-01-01 false Bulletin 1728H-701, Specification for Wood Crossarms (Solid and Laminated), Transmission Timbers and Pole Keys. 1728.201 Section 1728.201 Agriculture Regulations of the Department of Agriculture (Continued) RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE...
Code of Federal Regulations, 2012 CFR
2012-01-01
... 7 Agriculture 11 2012-01-01 2012-01-01 false Bulletin 1728H-701, Specification for Wood Crossarms (Solid and Laminated), Transmission Timbers and Pole Keys. 1728.201 Section 1728.201 Agriculture Regulations of the Department of Agriculture (Continued) RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE...
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 11 2013-01-01 2013-01-01 false Bulletin 1728H-701, Specification for Wood Crossarms (Solid and Laminated), Transmission Timbers and Pole Keys. 1728.201 Section 1728.201 Agriculture Regulations of the Department of Agriculture (Continued) RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE...
How to establish, maintain and use timber depletion accounts
William C. Siegel
2001-01-01
Section 1221 of the Internal Revenue Code defines capital expenditures. In general, these are amounts spent to acquire real estate or equipment, or to make improvements that increase the value of real estate or equipment already owned. Forestry examples include land, buildings, standing timber, reforestation costs, and tractors and trucks. Property owners who incur...
16 CFR 1611.37 - Reasonable and representative tests under section 8 of the Act.
Code of Federal Regulations, 2012 CFR
2012-01-01
... FLAMMABLE FABRICS ACT REGULATIONS STANDARD FOR THE FLAMMABILITY OF VINYL PLASTIC FILM Rules and Regulations... has a dense cut pile of uniform short length or looped yarns, does not exhibit a surface flash and does not ignite, such test shall suffice for any such fabric having a dense cut pile of the same length...
Code of Federal Regulations, 2014 CFR
2014-07-01
..., clinker coolers, raw material dryers, and open clinker storage piles? 63.1343 Section 63.1343 Protection... Limits § 63.1343 What standards apply to my kilns, clinker coolers, raw material dryers, and open clinker... associated with that kiln, clinker cooler, raw material dryer, and open clinker storage pile. All D/F, HCl...
Code of Federal Regulations, 2013 CFR
2013-07-01
..., clinker coolers, raw material dryers, and open clinker storage piles? 63.1343 Section 63.1343 Protection... Limits § 63.1343 What standards apply to my kilns, clinker coolers, raw material dryers, and open clinker... associated with that kiln, clinker cooler, raw material dryer, and open clinker storage pile. All D/F, HCl...
36 CFR 228.63 - Removal under terms of a timber sale or other Forest Service contract.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 36 Parks, Forests, and Public Property 2 2012-07-01 2012-07-01 false Removal under terms of a timber sale or other Forest Service contract. 228.63 Section 228.63 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE MINERALS Disposal of Mineral Materials Types and Methods of...
36 CFR 228.63 - Removal under terms of a timber sale or other Forest Service contract.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 36 Parks, Forests, and Public Property 2 2014-07-01 2014-07-01 false Removal under terms of a timber sale or other Forest Service contract. 228.63 Section 228.63 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE MINERALS Disposal of Mineral Materials Types and Methods of...
36 CFR 228.63 - Removal under terms of a timber sale or other Forest Service contract.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 36 Parks, Forests, and Public Property 2 2013-07-01 2013-07-01 false Removal under terms of a timber sale or other Forest Service contract. 228.63 Section 228.63 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE MINERALS Disposal of Mineral Materials Types and Methods of...
36 CFR 228.63 - Removal under terms of a timber sale or other Forest Service contract.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 36 Parks, Forests, and Public Property 2 2011-07-01 2011-07-01 false Removal under terms of a timber sale or other Forest Service contract. 228.63 Section 228.63 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE MINERALS Disposal of Mineral Materials Types and Methods of...
36 CFR 228.63 - Removal under terms of a timber sale or other Forest Service contract.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 36 Parks, Forests, and Public Property 2 2010-07-01 2010-07-01 false Removal under terms of a timber sale or other Forest Service contract. 228.63 Section 228.63 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE MINERALS Disposal of Mineral Materials Types and Methods of...
36 CFR 223.80 - When advertisement is required.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 36 Parks, Forests, and Public Property 2 2010-07-01 2010-07-01 false When advertisement is required. 223.80 Section 223.80 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER Timber Sale Contracts Advertisement and Bids § 223.80 When advertisement is required. Except as...
Code of Federal Regulations, 2014 CFR
2014-07-01
... 31 Money and Finance:Treasury 3 2014-07-01 2014-07-01 false Transactions related to the importation of any round log or timber product originating in Liberia authorized. 593.510 Section 593.510... Licenses, Authorizations and Statements of Licensing Policy § 593.510 Transactions related to the...
Code of Federal Regulations, 2013 CFR
2013-07-01
... 31 Money and Finance:Treasury 3 2013-07-01 2013-07-01 false Transactions related to the importation of any round log or timber product originating in Liberia authorized. 593.510 Section 593.510... Licenses, Authorizations and Statements of Licensing Policy § 593.510 Transactions related to the...
Code of Federal Regulations, 2011 CFR
2011-07-01
... 31 Money and Finance:Treasury 3 2011-07-01 2011-07-01 false Transactions related to the importation of any round log or timber product originating in Liberia authorized. 593.510 Section 593.510... Licenses, Authorizations and Statements of Licensing Policy § 593.510 Transactions related to the...
26 CFR 1.612-1 - Basis for allowance of cost depletion.
Code of Federal Regulations, 2011 CFR
2011-04-01
... mineral content of deposits is a factor, see paragraphs (c), (d), (e), and (f) of § 1.611-2. In cases... allowed in respect of any mineral or timber property is the adjusted basis provided in section 1011 for... retained. (b) Special rules. (1) The basis for cost depletion of mineral or timber property does not...
26 CFR 1.612-1 - Basis for allowance of cost depletion.
Code of Federal Regulations, 2010 CFR
2010-04-01
... mineral content of deposits is a factor, see paragraphs (c), (d), (e), and (f) of § 1.611-2. In cases... allowed in respect of any mineral or timber property is the adjusted basis provided in section 1011 for... retained. (b) Special rules. (1) The basis for cost depletion of mineral or timber property does not...
Code of Federal Regulations, 2010 CFR
2010-07-01
... environmental damage or to conform to forest plans. Timber sale contract, permits, and other such instruments... revisions of land and resource management plans adopted subsequent to award or issuance of a timber sale... prevent environmental damage or to conform to forest plans. 223.113 Section 223.113 Parks, Forests, and...
PILING PLAN OF SHIPBUILDING WAYS AND WHIRLEY CRANE SUPPORT. United ...
PILING PLAN OF SHIPBUILDING WAYS AND WHIRLEY CRANE SUPPORT. United Engineering Company Ltd., Alameda Shipbuilding Plant. General plan and two sections. James J. Walsh, Consulting Engineer. Sheet no. 2. Scales 1 inch to 10 feet, and 1/4 inch to one foot. April 20, 1941, revised 5/7/41. blueprint - United Engineering Company Shipyard, Shipway Nos. 1 & 2, 2900 Main Street, Alameda, Alameda County, CA
Forest statistics for the Arkansas ozarks
D.D. Van Hooser
1948-01-01
This publication summarizes the data on forest area, timber volume, and timber growth collected by the Southern Forest Survey in the Ozark region of Arkansas, the 24 counties in the mountainous northwest portion of the Stats (figure 1). The survey, made between April 1947 and April 1948, was the first of its kind in this section of the State. The remainder of Arkansas...
Code of Federal Regulations, 2010 CFR
2010-01-01
... 3 The President 1 2010-01-01 2010-01-01 false Establishment of the Interagency Committee on Trade in Timber Products from Peru and Assignment of Function under Section 501 of the United States-Peru Trade Promotion Agreement Implementation Act Presidential Documents Other Presidential Documents Memorandum of May 1, 2009 Establishment of the...
Estimating sawmill processing capacity for Tongass timber: 2005 and 2006 update
Allen M. Brackley; Lisa K. Crone
2009-01-01
In spring 2006 and 2007, sawmill capacity and wood utilization information was collected for selected mills in southeast Alaska. The collected information is required to prepare information for compliance with Section 705(a) of the Tongass Timber Reform Act. The total estimated design capacity in the region (active and inactive mills) was 289,850 thousand board feet (...
Estimating sawmill processing capacity for Tongass timber: 2003 and 2004 update.
Allen M. Brackley; Daniel J. Parrent; Thomas D. Rojas
2006-01-01
In spring 2004 and 2005, sawmill capacity and wood utilization information was collected for selected mills in southeast Alaska. The collected information is required to prepare information for compliance with Section 705(a) of the Tongass Timber Reform Act. The total capacity in the region (active and inactive mills) was 370,350 thousand board feet (mbf) Scribner log...
Identification of Defects in Piles Through Dynamic Testing
NASA Astrophysics Data System (ADS)
Liao, Shutao T.; Roesset, Jose M.
1997-04-01
The objective of this work was to evaluate the theoretical capabilities of the non-destructive impact-response method in detecting the existence of a single defect in a pile, its location and its length. The cross-section of the pile is assumed to be circular and the defects are assumed to be axisymmetric in geometry. As mentioned in the companion paper, special codes utilizing one-dimensional (1-D) and three-dimensional (3-D) axisymmetric finite element models were developed to simulate the responses of defective piles to an impact load. Extensive parametric studies were then performed. In each study, the results from the direct use of time histories of displacements or velocities and the mechanical admittance (or mobility) function were compared in order to assess their capabilities. The effects of the length and the width of a defect were also investigated using these methods. Int. J. Numer. Anal. Meth. Geomech., vol. 21, 277-291 (1997)
Modelling root reinforcement in shallow forest soils
Skaugset, Arne E.
1997-01-01
A hypothesis used to explain the relationship between timber harvesting and landslides is that tree roots add mechanical support to soil, thus increasing soil strength. Upon harvest, the tree roots decay which reduces soil strength and increases the risk of management -induced landslides. The technical literature does not adequately support this hypothesis. Soil strength values attributed to root reinforcement that are in the technical literature are such that forested sites can't fail and all high risk, harvested sites must fail. Both unstable forested sites and stable harvested sites exist, in abundance, in the real world thus, the literature does not adequately describe the real world. An analytical model was developed to calculate soil strength increase due to root reinforcement. Conceptually, the model is composed of a reinforcing element with high tensile strength, i.e. a conifer root, embedded in a material with little tensile strength, i.e. a soil. As the soil fails and deforms, the reinforcing element also deforms and stretches. The lateral deformation of the reinforcing element is treated analytically as a laterally loaded pile in a flexible foundation and the axial deformation is treated as an axially loaded pile. The governing differential equations are solved using finite-difference approximation techniques. The root reinforcement model was tested by comparing the final shape of steel and aluminum rods, parachute cord, wooden dowels, and pine roots in direct shear with predicted shapes from the output of the root reinforcement model. The comparisons were generally satisfactory, were best for parachute cord and wooden dowels, and were poorest for steel and aluminum rods. A parameter study was performed on the root reinforcement model which showed reinforced soil strength increased with increasing root diameter and soil depth. Output from the root reinforcement model showed a strain incompatibility between large and small diameter roots. The peak increase in soil strength attributed to roots was controlled by the small (<4mm) diameter root fraction. These results were used to calculate the effect of timber harvesting on a small, approximately 7.6 m3 (10 yd3), hypothetical landslide in a shallow, cohesionless, forest soil. The root reinforcement model predicted a post-harvest reduction in soil strength of 14 and 19 percent for a soil with and without 5 kPa (105 lbs/ft2) of cohesion, respectively.
Thomas L. Eberhardt; Philip M. Sheridan; Arvind A.R. Bhuta
2011-01-01
Abstract: Longleaf pine (Pinus palustris Mill.) cannot be distinguished from the other southern pines based on wood anatomy alone. A method that involves measuring pith and second annual ring diameters, reported by Arthur Koehler in 1932 (The Southern Lumberman, 145: 36â37), was revisited as an option for identifying longleaf pine timbers and stumps. Cross-section...
Code of Federal Regulations, 2011 CFR
2011-07-01
... 31 Money and Finance:Treasury 3 2011-07-01 2011-07-01 false Release of any round log or timber product originating in Liberia from a bonded warehouse or foreign trade zone. 593.412 Section 593.412 Money and Finance: Treasury Regulations Relating to Money and Finance (Continued) OFFICE OF FOREIGN ASSETS CONTROL, DEPARTMENT OF THE TREASURY FORMER...
Code of Federal Regulations, 2014 CFR
2014-07-01
... 31 Money and Finance:Treasury 3 2014-07-01 2014-07-01 false Release of any round log or timber product originating in Liberia from a bonded warehouse or foreign trade zone. 593.412 Section 593.412 Money and Finance: Treasury Regulations Relating to Money and Finance (Continued) OFFICE OF FOREIGN ASSETS CONTROL, DEPARTMENT OF THE TREASURY FORMER...
Code of Federal Regulations, 2010 CFR
2010-07-01
... 31 Money and Finance: Treasury 3 2010-07-01 2010-07-01 false Release of any round log or timber product originating in Liberia from a bonded warehouse or foreign trade zone. 593.412 Section 593.412 Money and Finance: Treasury Regulations Relating to Money and Finance (Continued) OFFICE OF FOREIGN ASSETS CONTROL, DEPARTMENT OF THE TREASURY FORMER...
NASA Astrophysics Data System (ADS)
Jayasree, P. K.; Arun, K. V.; Oormila, R.; Sreelakshmi, H.
2018-05-01
As per Indian Standards, laterally loaded piles are usually analysed using the method adopted by IS 2911-2010 (Part 1/Section 2). But the practising engineers are of the opinion that the IS method is very conservative in design. This work aims at determining the extent to which the conventional IS design approach is conservative. This is done through a comparative study between IS approach and the theoretical model based on Vesic's equation. Bore log details for six different bridges were collected from the Kerala Public Works Department. Cast in situ fixed head piles embedded in three soil conditions both end bearing as well as friction piles were considered and analyzed separately. Piles were also modelled in STAAD.Pro software based on IS approach and the results were validated using Matlock and Reese (In Proceedings of fifth international conference on soil mechanics and foundation engineering, 1961) equation. The results were presented as the percentage variation in values of bending moment and deflection obtained by different methods. The results obtained from the mathematical model based on Vesic's equation and that obtained as per the IS approach were compared and the IS method was found to be uneconomical and conservative.
1980-10-01
failure was noted in any other area of the facility. :’.. - . - ..- UNDERWATER FACILITI ES INSPECTION AND ASSESSMENT AT S- MAGNETIC SILENCING FACILITY...piling were found to be in excellent condition. No damage or failure was noted in any other * area of the facility. EXECUTIVE SUI’IARY TABLE U Piling...5-1 LEGEND TO TABLES. .... ........... ........ T-1 - -TABLE 1: REMAINING CROSS-SECTIONAL AREA AND DESCRIPTION OF DAMAGE TO
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schenian, P.A.
1995-07-01
In July 1995, the Fort Knox Contract Staff Archaeologist conducted a Phase I archaeological survey of a proposed timber harvest area in Hunting Area 54 on the Fort Knox Military Reservation, Hardin County, Kentucky. The timber harvest area encompasses approximately 48 acres (19 ha) in an irregularly shaped area on the ridge tops and slopes adjoining Easy Gap Road. Only selected trees, which were marked by Forestry Section personnel prior to the archaeological survey, will be harvested for marketing, but fallen and damaged trees also will be removed. The survey resulted in the discovery of no archaeological sites. A cemeterymore » (Cemetery Number 109 or the Stone/Hem Cemetery) is located in the project area and has considerable tree damage near it. It is recommended that the timber harvest be conducted as proposed, but that the contract staff archaeologist be on-site when the timbering is performed in the vicinity of the cemetery to assist with the protection and clean-up of the cemetery. If feasible, the cemetery should be fenced after the logging operations are completed to facilitate its future location, protection, and management.« less
Special sensors for deformation measurements of different construction materials and structures
NASA Astrophysics Data System (ADS)
Glisic, Branko; Inaudi, Daniele; Kronenberg, Pascal; LLoret, Sandra; Vurpillot, Samuel
1999-05-01
SOFO is a fiber optic sensor system that allows the monitoring of micrometer deformations over measurement bases up to a few meters. It is particularly adapted to measure civil structures built with conventional civil engineering materials (concrete, steel and timber). It has been successfully tested in different types of structures such as bridges, tunnels and piles. The application of the system is however limited in some case when unusual materials are used in the construction and in other cases by the dimensions of standard SOFO sensors. To extend the domain of application of the current system, special sensors have been developed. In this paper we present four special SOFO sensors: long, membrane, thin and stiff sensors. The long sensor has a measurement basis of several tenths of meters and its purpose is the measurement of deformations in massive and large structures (dames, tunnels). The membrane sensor is for use on laminated materials (e.g. membrane roofing) and it is easy to install by simply gluing it to the structure to be monitored. Since standard sensors can not be used for thin mortar layers because of their cross- section, a thin sensor has been developed, too. Finally, the aim of the stiff sensor is to determine the hardening (solidification) time of concrete. This time is determined by comparing the deformations of a stiff and a standard sensor, closely placed in the concrete at the very early age. The design of these sensors is presented along with significant application examples.
1983-10-01
broken piles in a concentrated area . As a result, the relieving platform is unsupported and in this are loading should be restricted to 50 psf until...concentration of damaged piles occurs on Section A near Drydock No. 4 and until repairs are made, loading should be restricted to 100 psf in this area . The...a concentrated area . As a result, the relieving platform is unsup- * ported and in this area loading should be restricted to 50 psf until repairs
12. CLOSEUP VIEW OF CROSS SECTION OF SPILLWAY FIFTY FEET ...
12. CLOSE-UP VIEW OF CROSS SECTION OF SPILLWAY FIFTY FEET FROM LAKESHORE, SHOWING REMAINS OF SPILLWAY TIMBERS, LOOKING WEST - Three Bears Lake & Dams, North of Marias Pass, East Glacier Park, Glacier County, MT
Impact of small-scale structures on estuarine circulation
NASA Astrophysics Data System (ADS)
Liu, Zhuo; Zhang, Yinglong J.; Wang, Harry V.; Huang, Hai; Wang, Zhengui; Ye, Fei; Sisson, Mac
2018-05-01
We present a novel and challenging application of a 3D estuary-shelf model to the study of the collective impact of many small-scale structures (bridge pilings of 1 m × 2 m in size) on larger-scale circulation in a tributary (James River) of Chesapeake Bay. We first demonstrate that the model is capable of effectively transitioning grid resolution from 400 m down to 1 m near the pilings without introducing undue numerical artifact. We then show that despite their small sizes and collectively small area as compared to the total channel cross-sectional area, the pilings exert a noticeable impact on the large-scale circulation, and also create a rich structure of vortices and wakes around the pilings. As a result, the water quality and local sedimentation patterns near the bridge piling area are likely to be affected as well. However, when evaluating over the entire waterbody of the project area, the near field effects are weighed with the areal percentage which is small compared to that for the larger unaffected area, and therefore the impact on the lower James River as a whole becomes relatively insignificant. The study highlights the importance of the use of high resolution in assessing the near-field impact of structures.
Stratigraphy and depositional environments of Fox Hills Formation (Late Cretaceous), Williston basin
DOE Office of Scientific and Technical Information (OSTI.GOV)
Daly, D.J.
The Fox Hills Formation (Late Cretaceous, Maestrichtian) was investigated where it crops out along the southern flank of the Williston basin and in the subsurface over the central portion of the basin, using 300 well logs. The formation is conformable and gradational with the underlying Pierre formation and can be either conformable or unconformable with the overlying Hell Creek Formation. The Fox Hills Formation is younger, thicker, and stratigraphically more complex to the east and is comprised of marginal marine sediments deposited during the final Cretaceous regression. To the west, the Fox Hills Formation is an upward-coarsening unit generally 30more » to 45 m thick and usually contains three members: from the base, Trail City, Timber Lake, and Colgate. The lower Fox Hills (Trail City, Timber Lake) is generally dominated by hummocky bedding and contains a variety of trace fossils, most notably Ophiomorpha. The upper Fox Hills (Colgate), where present, is characterized by cross-bedding. To the east, including the type area, the section is generally 80 to 100 m thick and contains four members: from the base, Trail City, Timber Lake, Iron Lightning (Colgate and Bullhead lithofacies), and Linton. In contrast to the section in the west, this section is as much as three times thicker, contains abundant body fossils, generally lacks hummocky bedding, and contains the Bullhead and Linton strata. In the west, the strata represent lower shoreface deposits, predominantly of storm origin (lower Fox Hills), overlain by upper shoreface and fluvial deposits (upper Fox Hills). In the east, the lower Fox Hills contains deposits of the lower shoreface (Trail City) and a barrier bar complex (Timber Lake), overlain by the deltaic deposits of the upper Fox Hills (Iron Lightning, Linton).« less
Late Neolithic vegetation history at the pile-dwelling site of Palù di Livenza (northeastern Italy
NASA Astrophysics Data System (ADS)
Pini, Roberta
2004-12-01
The Late Neolithic pile-dwelling of Palù di Livenza yielded archaeological remains typical of the Square Mouth Pottery and Lagozza Cultures. A palynological investigation reveals important changes in the vegetation due to anthropogenic pressure. Between ca. 6590 and 5960 cal. yr BP, dense oak wood forests with deciduous Quercus, Fagus and Corylus extended around the mire, with no signs of human impact. The establishment of the pile-dwelling, dated to ca. 5960 cal. yr BP, led to a strong reduction of forests, reclamation of wetlands, and expansion of herbaceous communities, with cultivated species, infestant weeds, nitrophilous and ruderal herbs, pastures and meadows. According to AMS dates and previous archaeological chronologies, the pile-dwelling persisted for about 700 years (from ca. 5960 to 5260 cal. yr BP). The history of the pile-dwelling after ca. 5260 cal. yr BP cannot be reconstructed because of recent contamination of the top part of the section. Rarefaction analysis was applied to estimate changes of palynological richness through time: the highest E(Tn) (between 56 and 69 taxa) are contemporaneous with the local development of the pile-dwelling. The comparison of pollen data with archaeobotanical evidence indicates that Fragaria vesca, Malus sylvestris, Papaver somniferum and Physalis alkekengi were gathered at some distance from the site and that Linum usitatissimum is strongly under-represented in pollen samples. Crop cultivation can be estimated for a radius of several hundred metres around the mire. Palù di Livenza is significant in the context of Neolithic archaeobotany of northern Italy and neighbouring countries. Copyright
Foundation Analysis East Coast Air Combat Maneuvering Range Offshore Kitty Hawk, North Carolina.
1976-09-01
1976 86 2 3 025 TABLE OF CONTENTS SECTION TITLE PAGE 1.0 INTRODUCTION 1.1 Introduction 1.01 1.2 Methods of Analysis 1.01 1.3 Personnel Resumes 1.02...piling into the desired penetration. 1.2 METHODS OF ANALYSIS The method employed to perform the computation of pipe pile capacity curves, as presented...AD-A163 522 FOUNDATION ANALYSIS EAST COAST AIR COMBAT NANsUVERING 14S RANGE OFFSHORE KITT.. CU) CREST ENGINEERING INC TULSA OK SEP 76 27-M7-97 CNES
20. Photocopied August 1978. CANAL SECTION III, LOOKING SOUTH, AUGUST ...
20. Photocopied August 1978. CANAL SECTION III, LOOKING SOUTH, AUGUST OR SEPTEMBER 1900, FOLLOWING A MAJOR BANK SLIDE. SLIDES LIKE THIS ONE WERE FAIRLY FREQUENT FOLLOWING RAIN STORMS BEFORE THE CANAL WALLS WERE TIMBER LINED IN THE EARTH SECTIONS. (64) - Michigan Lake Superior Power Company, Portage Street, Sault Ste. Marie, Chippewa County, MI
Code of Federal Regulations, 2013 CFR
2013-10-01
... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false Penalties. 9265.6 Section 9265.6 Public... Resources Management § 9265.6 Penalties. (a) Sales administration. Under section 303(a) of the Federal Land... acts results in death. (b) Free use of timber. (1) Under section 303(a) of the Federal Land Policy and...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false Penalties. 9265.6 Section 9265.6 Public... Resources Management § 9265.6 Penalties. (a) Sales administration. Under section 303(a) of the Federal Land... acts results in death. (b) Free use of timber. (1) Under section 303(a) of the Federal Land Policy and...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Penalties. 9265.6 Section 9265.6 Public... Resources Management § 9265.6 Penalties. (a) Sales administration. Under section 303(a) of the Federal Land... acts results in death. (b) Free use of timber. (1) Under section 303(a) of the Federal Land Policy and...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false Penalties. 9265.6 Section 9265.6 Public... Resources Management § 9265.6 Penalties. (a) Sales administration. Under section 303(a) of the Federal Land... acts results in death. (b) Free use of timber. (1) Under section 303(a) of the Federal Land Policy and...
NASA Astrophysics Data System (ADS)
Luo, Min
2018-02-01
On the basis of consulting data, the bearing mechanism of gravel pile composite foundation is analyzed in this paper. The use of ANSYS software under flexible foundation according to the plum blossoms gravel pile additional stress between pile and soil additional stress distribution, load on pile top stress and pile bearing rate of modulus ratio between pile and soil on the pile top stress and rate of pile bearing capacity, pile-soil effect the stress ratio was calculated and analyzed, providing reasonable design reference for the design of gravel pile composite foundation.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wilson-Nichols, M.J.; Egidi, P.V.; Roemer, E.K.
2000-09-01
f I The Oak Ridge National Laboratory (ORNL) Environmental Technology Section conducted an independent verification (IV) survey of the clean storage pile at the Johnston Atoll Plutonium Contaminated Soil Remediation Project (JAPCSRP) from January 18-25, 1999. The goal of the JAPCSRP is to restore a 24-acre area that was contaminated with plutonium oxide particles during nuclear testing in the 1960s. The selected remedy was a soil sorting operation that combined radiological measurements and mining processes to identify and sequester plutonium-contaminated soil. The soil sorter operated from about 1990 to 1998. The remaining clean soil is stored on-site for planned beneficialmore » use on Johnston Island. The clean storage pile currently consists of approximately 120,000 m3 of coral. ORNL conducted the survey according to a Sampling and Analysis Plan, which proposed to provide an IV of the clean pile by collecting a minimum number (99) of samples. The goal was to ascertain wi th 95% confidence whether 97% of the processed soil is less than or equal to the accepted guideline (500-Bq/kg or 13.5-pCi/g) total transuranic (TRU) activity.« less
Use of pile driving analysis for assessment of axial load capacity of piles.
DOT National Transportation Integrated Search
2012-05-01
Driven piles are commonly used in foundation engineering. Pile driving formulae, which directly relate the pile set per blow : to the capacity of the pile, are commonly used to decide whether an installed pile will have the designed capacity. However...
Use of Pile Driving Analysis for Assessment of Axial Load Capacity of Piles
DOT National Transportation Integrated Search
2012-05-01
Driven piles are commonly used in foundation engineering. Pile driving formulae, which directly relate the pile set per blow : to the capacity of the pile, are commonly used to decide whether an installed pile will have the designed capacity. However...
NASA Astrophysics Data System (ADS)
tongqing, Wu; liang, Li; xinjian, Liu; Xu, nianchun; Tian, Mao
2018-03-01
Self-balanced method is carried out on the large diameter rock-socketed filling piles of high-pile wharf at Inland River, to explore the distribution laws of load-displacement curve, pile internal force, pile tip friction resistance and pile side friction resistance under load force. The results showed that: the tip resistance of S1 and S2 test piles accounted for 53.4% and 53.6% of the pile bearing capacity, respectively, while the total side friction resistance accounted for 46.6% and 46.4% of the pile bearing capacity, respectively; both the pile tip friction resistance and pile side friction resistance can be fully played, and reach to the design requirements. The reasonability of large diameter rock-socketed filling design is verified through test analysis, which can provide basis for the optimization of high-pile wharf structural type, thus reducing the wharf project cost, and also providing reference for the similar large diameter rock-socketed filling piles of high-pile wharf at Inland River.
Michael A. Ritter; Keith F. Faherty
1999-01-01
This section addresses the design of two types of glulam timber bridges : beam bridges with transverse decks and longitudinal glulam deck (slab) bridges. The material presented in the section is based on the 1992 edition of the AASHTO Standard Specifications for Highway Bridges (AASHTO specifications), including interim specifications through 1993. When specific design...
30 CFR 77.215-3 - Refuse piles: certification.
Code of Federal Regulations, 2010 CFR
2010-07-01
... SAFETY AND HEALTH MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND... magnitude as to endanger the lives of miners. (b) After the initial certification required by this section...
30 CFR 843.15 - Informal public hearing.
Code of Federal Regulations, 2010 CFR
2010-07-01
..., “mining” includes (1) extracting coal from the earth or from coal waste piles and transporting it within... section shall be delivered to such person by an authorized representative or sent by certified mail to... of the mine. (e) Section 554 of Title 5 of the United States Code, regarding requirements for formal...
NASA Astrophysics Data System (ADS)
Wang, W. C.; Lin, D. G.
2015-12-01
This study investigates the bearing capacities and mechanical behaviors of pile foundation installed on the seabed of wind farm near Chang-Hua coast of western Taiwan for the supporting structure of offshore wind turbine. A series of three-dimensional (3-D) numerical modeling of pile foundation subjected to various types of combined loading were carried out using Plaix-3D finite element program to investigate the interactive behaviors between soil and pile. In the numerical modeling, pile diameter, pile length and pile spacing were selected as design parameters to inspect their effects on the bearing capacities and deformation behaviors of the pile foundation. For a specific design parameter combination, one can obtain the corresponding loading-displacement curve, various ultimate bearing capacities, V-H (Vertical-Horizontal combined loading) ultimate bearing capacity envelope, and p-ycurve of pile foundation. Numerical results indicate that: (1) Large displacement and plastic points at ultimate state mostly distribute and concentrate in the topsoil of seabed and around pile head. (2) The soil resistance on the soil-pile interface is ascending with the increases of depth, pile diameter and pile length. (3) The vertical and horizontal bearing capacities of pile group increase significantly with the increase of pile diameter. (4) The vertical and bending moment capacities of pile group increase greatly with the increase of pile length whereas the horizontal capacity is almost insensitive to pile length. (5) The bending moment of pile is highly influenced by the pile spacing. (6) For different design parameters, the shape of ultimate bearing capacity envelopes of pile group on V-H plane is similar while the envelopes will expand as the design parameters increase. For different loading levels of bending moment, the envelopes on V-H plane will contract gradually as the bending moment loading increasing.
Stiffness analysis of glued connection of the timber-concrete structure
NASA Astrophysics Data System (ADS)
Daňková, Jana; Mec, Pavel; Majstríková, Tereza
2016-01-01
This paper presents results of experimental and mathematical analysis of stiffness characteristics of a composite timber-concrete structure. The composite timberconcrete structure presented herein is non-typical compared to similar types of building structures. The interaction between the timber and concrete part of the composite cross-section is not based on metal connecting elements, but it is ensured by a glued-in perforated mesh made of plywood. The paper presents results of experimental and mathematical analysis for material alternatives of the solution of the glued joint. The slip modulus values were determined experimentally. Data obtained from the experiment evaluated by means of regression analysis. Test results were also used as input data for the compilation of a 3D model of a composite structure by means of the 3D finite element model. On the basis of result evaluation, it can be stated that the stress-deformation behaviour at shear loading of this specific timber-concrete composite structure can be affected by the type of glue used. Parameters of the 3D model of both alternative of the structure represent well the behaviour of the composite structure and the model can be used for predicting design parameters of a building structure.
NASA Astrophysics Data System (ADS)
Fatnanta, F.; Satibi, S.; Muhardi
2018-03-01
In an area dominated by thick peat soil layers, driven piles foundation is often used. These piles are generally skin friction piles where the pile tips do not reach hard stratum. Since the bearing capacity of the piles rely on the resistance of their smooth skin, the bearing capacity of the piles are generally low. One way to increase the bearing capacity of the piles is by installing helical plates around the pile tips. Many research has been performed on helical pile foundation. However, literature on the use of helical pile foundation on peat soil is still hardly found. This research focus on the study of axial bearing capacity of helical pile foundation in peat soil, especially in Riau Province. These full-scale tests on helical pile foundation were performed in a rectangular box partially embedded into the ground. The box is filled with peat soil, which was taken from Rimbo Panjang area in the district of Kampar, Riau Province. Several helical piles with different number, diameter and spacing of the helical plates have been tested and analysed. The tests result show that helical pile with three helical plates of uniform diameter has better bearing capacity compared to other helical piles with varying diameter and different number of helical plates. The bearing capacity of helical pile foundation is affected by the spacing between helical plates. It is found that the effective helical plates spacing for helical pile foundation with diameter of 15cm to 35cm is between 20cm to 30cm. This behaviour may be considered to apply to other type of helical pile foundations in peat soil.
Research on the reasonable pile spacing of micro pile composite soil nailing
NASA Astrophysics Data System (ADS)
Liu, Jun yan; Liu, Yan; Song, Xiang hua
2017-08-01
Through the numerical simulation software FLAC3D, study on the synergetic effect of micro pile composite soil nailing will be studied. By adjusting the micro pile spacing and analysing the displacement field and stress field of soil, we can find that supporting effect of the soil nail hasn’t work yet when the micro pile spacing is 2D. The soil arching between piles has been formed in the pile spacing 4D ∼ 6D. The composite effect of micro pile and soil nailing will be the best and the soil arch behind piles will be firstly formed in 6D, the horizontal saddle soil arch will be formed between the nails. The nail head coincidence pressure area and micro pile pressure area are overlapping to maintain stability in the soil between piles. When the micro pile spacing is 9D, the arch behind piles will be failure, the soil flows around, but the saddle arch between the nails into circular arch, the supporting effect of the soil nailing is enhanced. When the micro pile spacing is 12D, the arch of the nails becomes smaller, sliding surface appears primitively. Based on the conclusions above, it is suggested that the micro pile spacing between 2D ∼ 6D is suitable for the micro pile and soil nailing composite support. The conclusion can provide theoretical basis for the design and construction of micro pile composite soil nailing.
National measures of forest productivity for timber
Peter J. Ince; H. Edward Dickerhoof; H. Fred Kaiser
1989-01-01
This report presents national measures of forest productivity for timber. These measures reveal trends in the relationship between quantity of timber produced by forests and the quantity of forest resources employed in timber production. Timber production is measured by net annual growth of timber and annual timber removals. Measures of timber productivity include...
Nde of Frp Wrapped Columns Using Infrared Thermography
NASA Astrophysics Data System (ADS)
Halabe, Udaya B.; Dutta, Shasanka Shekhar; GangaRao, Hota V. S.
2008-02-01
This paper investigates the feasibility of using Infrared Thermography (IRT) for detecting debonds in Fiber Reinforced Polymer (FRP) wrapped columns. Laboratory tests were conducted on FRP wrapped concrete cylinders of size 6″×12″ (152.4 mm×304.8 mm) in which air-filled and water-filled debonds of various sizes were placed underneath the FRP wraps. Air-filled debonds were made by cutting plastic sheets into the desired sizes whereas water-filled debonds were made by filling water in custom made polyethylene pouches. Both carbon and glass fiber reinforced wraps were considered in this study. Infrared tests were conducted using a fully radiometric digital infrared camera which was successful in detecting air-filled as well as water-filled subsurface debonds. In addition to the laboratory testing, two field trips were made to Moorefield, West Virginia for detecting subsurface debonds in FRP wrapped timber piles of a railroad bridge using infrared testing. The results revealed that infrared thermography can be used as an effective nondestructive evaluation tool for detecting subsurface debonds in structural components wrapped with carbon or glass reinforced composite fabrics.
Analysis on pile testing results of post-grouting bored pile
NASA Astrophysics Data System (ADS)
Zheng, A. R.
2017-04-01
Based on static load test results, the bearing capacity of bored piles with pile-toe and pile-shaft post-grouting has been analyzed. The analysis reveals that: with post-grouting, the interface between pile and surrounding soil are strengthened and the relative sliding displacement in between is reduced; end resistance of pile is enhanced and can be mobilized at earlier stage with smaller sliding displacement. As a result, the performance of bored pile is improved with increased bearing capacity and reduced settlement.
Improved design for driven piles based on a pile load test program in Illinois : phase 2.
DOT National Transportation Integrated Search
2014-09-01
A dynamic load test program consisting of 38 sites and 111 piles with restrikes was conducted throughout Illinois : to improve the Illinois Department of Transportation design of driven piling. Pile types included steel H-piles and : closed-ended pip...
NASA Astrophysics Data System (ADS)
Goit, Chandra Shekhar; Saitoh, Masato
2013-03-01
Horizontal impedance functions of inclined single piles are measured experimentally for model soil-pile systems with both the effects of local soil nonlinearity and resonant characteristics. Two practical pile inclinations of 5° and 10° in addition to a vertical pile embedded in cohesionless soil and subjected to lateral harmonic pile head loadings for a wide range of frequencies are considered. Results obtained with low-to-high amplitude of lateral loadings on model soil-pile systems encased in a laminar shear box show that the local nonlinearities have a profound impact on the horizontal impedance functions of piles. Horizontal impedance functions of inclined piles are found to be smaller than the vertical pile and the values decrease as the angle of pile inclination increases. Distinct values of horizontal impedance functions are obtained for the `positive' and `negative' cycles of harmonic loadings, leading to asymmetric force-displacement relationships for the inclined piles. Validation of these experimental results is carried out through three-dimensional nonlinear finite element analyses, and the results from the numerical models are in good agreement with the experimental data. Sensitivity analyses conducted on the numerical models suggest that the consideration of local nonlinearity at the vicinity of the soil-pile interface influence the response of the soil-pile systems.
Timber valuea matter of choice: a study of how end use assumptions affect timber values.
John H. Beuter
1971-01-01
The relationship between estimated timber values and actual timber prices is discussed. Timber values are related to how, where, and when the timber is used. An analysis demonstrates the relative values of a typical Douglas-fir stand under assumptions about timber use.
Static behaviour of 3x3 pile group in sand under lateral loading
NASA Astrophysics Data System (ADS)
SureshKumar, R.; BharathKumar, R.; MohanKumar, L.; Visuvasam, J.; Sairam, V.
2017-11-01
This paper presents the static lateral load behaviour of single pile in comparison with 3x3 pile group in sand. The piled raft system is modelled using PLAXIS3D. Parametric studies of varying length to diameter (L/D) and spacing of piles in a group and diameter of piles (S/D) have been performed. The behaviour of group piles in terms of static lateral load capacity and group efficiency has been discussed.
Timber resources of the Sacramento area, California, 1972.
Brian R. Wall
1978-01-01
This report summarizes the 1972 timber resource inventory of the Sacramento area, California. Included are detailed tables of forest area, timber volume, growth, mortality, and timber cut and a discussion of the current timber resource and timber industry situation.
40 CFR 411.31 - Specialized definitions.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 30 2012-07-01 2012-07-01 false Specialized definitions. 411.31 Section 411.31 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS CEMENT MANUFACTURING POINT SOURCE CATEGORY Materials Storage Piles Runoff Subcategory...
Dynamic load testing on the bearing capacity of prestressed tubular concrete piles in soft ground
NASA Astrophysics Data System (ADS)
Yu, Chuang; Liu, Songyu
2008-11-01
Dynamic load testing (DLT) is a high strain test method for assessing pile performance. The shaft capacity of a driven PTC (prestressed tubular concrete) pile in marine soft ground will vary with time after installation. The DLT method has been successfully transferred to the testing of prestressed pipe piles in marine soft clay of Lianyungang area in China. DLT is investigated to determine the ultimate bearing capacity of single pile at different period after pile installation. The ultimate bearing capacity of single pile was founded to increase more than 70% during the inventing 3 months, which demonstrate the time effect of rigid pile bearing capacity in marine soft ground. Furthermore, the skin friction and axial force along the pile shaft are presented as well, which present the load transfer mechanism of pipe pile in soft clay. It shows the economy and efficiency of DLT method compared to static load testing method.
26 CFR 1.611-5 - Depreciation of improvements.
Code of Federal Regulations, 2010 CFR
2010-04-01
.... Section 611 provides in the case of mines, oil and gas wells, other natural deposits, and timber that... governing the apportioning of depreciation allowances under sections 611 and 167 in the case of property held by one person for life with remainder to another or in the case of property held in trust or by an...
Code of Federal Regulations, 2010 CFR
2010-07-01
... reservoir; logging. 207.330 Section 207.330 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT... reservoir; logging. (a) Parties engaged in the transportation of loose logs, timbers, and rafts of logs, poles, posts, ties, or pulpwood, on the waters described in this section, shall conduct their operations...
Code of Federal Regulations, 2011 CFR
2011-07-01
... reservoir; logging. 207.330 Section 207.330 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT... reservoir; logging. (a) Parties engaged in the transportation of loose logs, timbers, and rafts of logs, poles, posts, ties, or pulpwood, on the waters described in this section, shall conduct their operations...
Use and production of solid sawn timbers in the United States
Gerry Jackson; James Howard; A. L. Hammett
2001-01-01
Although timber production has grown steadily over the last decade, information about the use of timbers and the corresponding resource remains in short supply. This study adds to the available literature on solid sawn timbers by compiling data on timber production and uses. The major categories of solid sawn timbers researched were railroad ties, timber bridges, and...
NASA Astrophysics Data System (ADS)
Schilder, Constanze; Kohlhoff, Harald; Hofmann, Detlef; Basedau, Frank; Habel, Wolfgang R.; Baeßler, Matthias; Niederleithinger, Ernst; Georgi, Steven; Herten, Markus
2013-05-01
Static and dynamic pile tests are carried out to determine the load bearing capacity and the quality of reinforced concrete piles. As part of a round robin test to evaluate dynamic load tests, structure integrated fibre optic strain sensors were used to receive more detailed information about the strains along the pile length compared to conventional measurements at the pile head. This paper shows the instrumentation of the pile with extrinsic Fabry-Perot interferometers sensors and fibre Bragg gratings sensors together with the results of the conducted static load test as well as the dynamic load tests and pile integrity tests.
26 CFR 1.611-0 - Regulatory authority.
Code of Federal Regulations, 2010 CFR
2010-04-01
...) INCOME TAXES (CONTINUED) Natural Resources § 1.611-0 Regulatory authority. Sections 1.611-1 through 1.614... of mines, oil and gas wells, other natural deposits and timber. [T.D. 6965, 33 FR 10692, July 26...
26 CFR 1.611-0 - Regulatory authority.
Code of Federal Regulations, 2011 CFR
2011-04-01
...) INCOME TAXES (CONTINUED) Natural Resources § 1.611-0 Regulatory authority. Sections 1.611-1 through 1.614... of mines, oil and gas wells, other natural deposits and timber. [T.D. 6965, 33 FR 10692, July 26...
Underwater noise reduction of marine pile driving using a double pile.
DOT National Transportation Integrated Search
2015-12-01
Impact pile driving of steel piles in marine environments produces extremely high sound levels in the water. : It has been shown that current pile driving noise attenuation techniques, such as bubble curtains and : cofferdams, provide limited noise r...
Effects of site preparation on timber and non-timber values of loblolly pine plantations
Jianbang Gan; Stephen H. Kolison; James H. Miller; Tasha M. Hargrove
1998-01-01
This study evaluated the timber and non-timber values of the forest stands generated by four site preparation methods tested in the Tuskegee National Forest 15 yr earlier. The timber values of the forest stands were assessed with the timber yields predicted by the SE TWIGS model. Non-timber benefits were evaluated through the Contingent Valuation Method. Two hundred...
NASA Astrophysics Data System (ADS)
Hopkin, D. J.; El-Rimawi, J.; Lennon, T.; Silberschmidt, V. V.
2011-07-01
The advent of the structural Eurocodes has allowed civil engineers to be more creative in the design of structures exposed to fire. Rather than rely upon regulatory guidance and prescriptive methods engineers are now able to use such codes to design buildings on the basis of credible design fires rather than accepted unrealistic standard-fire time-temperature curves. Through this process safer and more efficient structural designs are achievable. The key development in enabling performance-based fire design is the emergence of validated numerical models capable of predicting the mechanical response of a whole building or sub-assemblies at elevated temperature. In such a way, efficiency savings have been achieved in the design of steel, concrete and composite structures. However, at present, due to a combination of limited fundamental research and restrictions in the UK National Annex to the timber Eurocode, the design of fire-exposed timber structures using numerical modelling techniques is not generally undertaken. The 'fire design' of timber structures is covered in Eurocode 5 part 1.2 (EN 1995-1-2). In this code there is an advanced calculation annex (Annex B) intended to facilitate the implementation of numerical models in the design of fire-exposed timber structures. The properties contained in the code can, at present, only be applied to standard-fire exposure conditions. This is due to existing limitations related to the available thermal properties which are only valid for standard fire exposure. In an attempt to overcome this barrier the authors have proposed a 'modified conductivity model' (MCM) for determining the temperature of timber structural elements during the heating phase of non-standard fires. This is briefly outlined in this paper. In addition, in a further study, the MCM has been implemented in a coupled thermo-mechanical analysis of uniaxially loaded timber elements exposed to non-standard fires. The finite element package DIANA was adopted with plane-strain elements assuming two-dimensional heat flow. The resulting predictions of failure time for given levels of load are discussed and compared with the simplified 'effective cross section' method presented in EN 1995-1-2.
NASA Astrophysics Data System (ADS)
Peterson, H.; Bay, D. S.; Beckie, R. D.; Mayer, K. U.; Klein, B.; Smith, L.
2009-12-01
An ongoing study at the Antamina Cu-Zn-Mo mine in Peru investigates the hydrology and geochemistry of heterogeneous waste rock at multiple scales. Three of five instrumented mesoscale experimental waste rock piles (36m X 36m X 10m high) were constructed between 2006 and 2008. The coarsest-grained Pile 1 exhibits rapid, intense response to rain and returns to residual saturation relatively quickly, suggesting a significant influence of preferential flow in addition to high-conductivity matrix flow. Pile 2, the finest-grained of the three piles, exhibits signals from rain events that are significantly delayed and muted in comparison to those from Pile 1. Except for in the finest size fractions, the particle size distribution of Pile 3 closely resembles that of Pile 2, yet Pile 3 responds to rain events more similarly to Pile 1 than Pile 2. The presence of large boulders in Pile 3 could facilitate preferential flow, either through surface flow effects across boulders or by contributing to the formation of unfilled void space acting as macropores at high infiltration rates. The rapid rain event response of Pile 3 could also be attributed to a silt-clay percentage that is similar to Pile 1, which is less than half of the silt-clay percentage observed in Pile 2 (i.e., ~3%, ~8.5%, and ~4% for Piles 1, 2 and 3, respectively). For each of the three piles, the pH of effluent collected from bottom lysimeters and internal pore water sampled with suction lysimeters has remained circumneutral, with notable maximum concentrations of 2.8 mg/L Zn from Pile 1, which is comprised of slightly reactive hornfels and marble waste rock; 13.4 mg/L Zn and 22.7 mg/L Mo from Pile 2, comprised of reactive intrusive waste rock; and 42.5 mg/L Zn from Pile 3, comprised of reactive exoskarn waste rock. Ongoing work includes analysis of two additional mixed-rock experimental piles, studies to investigate the role of microbes on metal release (Dockrey et al., this session), analysis of pore gas chemistry to aid in the characterization of weathering processes (Singurindy et al., this session), smaller scale barrel-sized field cells to assess specific material characteristics and scaling issues, complemented by laboratory column and mineralogical studies. Mechanistic modeling will be used to integrate the multiscale data and provide a framework for prediction at field scales.
Improvement of driven pile installation and design in Illinois : phase 2.
DOT National Transportation Integrated Search
2014-09-01
A dynamic load test program consisting of 38 sites and 111 piles with restrikes was conducted throughout Illinois : to improve the Illinois Department of Transportation design of driven piling. Pile types included steel H-piles and : closed-ended pip...
Recalibration of the GRLWEAP LRFD resistance factor for Oregon DOT.
DOT National Transportation Integrated Search
2011-02-01
The Bridge Section of the Oregon Department of Transportation (ODOT) is responsible for the design of all bridge structures and routinely uses GRLWEAP for controlling pile driving stresses and establishing capacity from the bearing graph. The LRFD re...
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 30 2012-07-01 2012-07-01 false [Reserved] 411.33 Section 411.33 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS CEMENT MANUFACTURING POINT SOURCE CATEGORY Materials Storage Piles Runoff Subcategory § 411.33 [Reserved] ...
40 CFR 411.31 - Specialized definitions.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 30 2013-07-01 2012-07-01 true Specialized definitions. 411.31 Section 411.31 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS CEMENT MANUFACTURING POINT SOURCE CATEGORY Materials Storage Piles Runoff Subcategory § 411.31...
40 CFR 411.31 - Specialized definitions.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 29 2014-07-01 2012-07-01 true Specialized definitions. 411.31 Section 411.31 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS CEMENT MANUFACTURING POINT SOURCE CATEGORY Materials Storage Piles Runoff Subcategory § 411.31...
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 29 2014-07-01 2012-07-01 true [Reserved] 411.33 Section 411.33 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS CEMENT MANUFACTURING POINT SOURCE CATEGORY Materials Storage Piles Runoff Subcategory § 411.33 [Reserved] ...
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 30 2013-07-01 2012-07-01 true [Reserved] 411.33 Section 411.33 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS CEMENT MANUFACTURING POINT SOURCE CATEGORY Materials Storage Piles Runoff Subcategory § 411.33 [Reserved] ...
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 29 2011-07-01 2009-07-01 true [Reserved] 411.33 Section 411.33 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS CEMENT MANUFACTURING POINT SOURCE CATEGORY Materials Storage Piles Runoff Subcategory § 411.33 [Reserved] ...
40 CFR 411.31 - Specialized definitions.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 29 2011-07-01 2009-07-01 true Specialized definitions. 411.31 Section 411.31 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS CEMENT MANUFACTURING POINT SOURCE CATEGORY Materials Storage Piles Runoff Subcategory § 411.31...
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 28 2010-07-01 2010-07-01 true [Reserved] 411.33 Section 411.33 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS CEMENT MANUFACTURING POINT SOURCE CATEGORY Materials Storage Piles Runoff Subcategory § 411.33 [Reserved] ...
40 CFR 411.31 - Specialized definitions.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 28 2010-07-01 2010-07-01 true Specialized definitions. 411.31 Section 411.31 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS CEMENT MANUFACTURING POINT SOURCE CATEGORY Materials Storage Piles Runoff Subcategory § 411.31...
36 CFR 223.61 - Establishing minimum stumpage rates.
Code of Federal Regulations, 2010 CFR
2010-07-01
... AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER Timber Sale Contracts Appraisal and Pricing.... No timber may be sold or cut under timber sale contracts for less than minimum stumpage rates except... amounts of material not meeting utilization standards of the timber sale contract. For any timber sale...
Andrew J. Hartsell
2007-01-01
This study compares returns on investments in Mississippi timber lands with returns on alternative investments. The real annual rates of return from mature, undisturbed timber lands in Mississippi over a 17-year period (1977-94) were computed. Southern Research Station Forest Inventory and Analysis (FIA) timber volume data and Timber Mart-South (TMS) data on timber...
Calibration of region-specific gates pile driving formula for LRFD : final report 561.
DOT National Transportation Integrated Search
2016-05-01
This research project proposes new DOTD pile driving formulas for pile capacity verification using pile driving blow : counts obtained at either end-of-initial driving (EOID) or at the beginning-of-restrike (BOR). The pile driving : formulas were dev...
Static pile load tests on driven piles into Intermediate-Geo Materials.
DOT National Transportation Integrated Search
2016-09-01
The Wisconsin Department of Transportation (WisDOT) has concerns with both predicting pile lengths and pile capacities for H-piles driven into Intermediate-Geo Materials (IGM). The goal of the research was to perform 7 static axial load tests at 7 lo...
An Annotated Bibliography of Patents Related to Coastal Engineering. Volume I. 1967-1970. Appendix.
1979-11-01
HYDRAULIC MODEL BASIN PILE, STRUCTURE CONNECTION ICE PROTECTION PILE, WOOD 16 -- mi • . ... -- POLLUTANT ABSORPTION SEISMIC ACOUSTIC TRANSMITTER ARRAY...NT SEABED PIPELINE PLACEMENT WIND MEASUREMENT SEABED PROPERTY MEASUREMENT WOOD PRESERVATIVE SEABED SCOUR PROTECTION SEABED SITE SURVEY SEABED SOIL...concrete, wood , or thin steel piling to aid driving. PILE EXTRACTOR - A means of removing a pile from the earth. PILE FOOTING - A means of increasing a
2016-11-01
1 1.3 Analyzing massive concrete pile-founded structures .................................................. 1 1.4 Pile...at the impact deck for the Lock and Dam 3 structural system at each incremental analysis step with C33=0.55...55 Table 4.2. Axial force, pile cap moment, and mudline moment for the three piles in the Lock and Dam 3 structural system at each
An experimental study on pile spacing effects under lateral loading in sand.
Khari, Mahdy; Kassim, Khairul Anuar; Adnan, Azlan
2013-01-01
Grouped and single pile behavior differs owing to the impacts of the pile-to-pile interaction. Ultimate lateral resistance and lateral subgrade modulus within a pile group are known as the key parameters in the soil-pile interaction phenomenon. In this study, a series of experimental investigation was carried out on single and group pile subjected to monotonic lateral loadings. Experimental investigations were conducted on twelve model pile groups of configurations 1 × 2, 1 × 3, 2 × 2, 3 × 3, and 3 × 2 for embedded length-to-diameter ratio l/d = 32 into loose and dense sand, spacing from 3 to 6 pile diameter, in parallel and series arrangement. The tests were performed in dry sand from Johor Bahru, Malaysia. To reconstruct the sand samples, the new designed apparatus, Mobile Pluviator, was adopted. The ultimate lateral load is increased 53% in increasing of s/d from 3 to 6 owing to effects of sand relative density. An increasing of the number of piles in-group decreases the group efficiency owing to the increasing of overlapped stress zones and active wedges. A ratio of s/d more than 6d is large enough to eliminate the pile-to-pile interaction and the group effects. It may be more in the loose sand.
An Experimental Study on Pile Spacing Effects under Lateral Loading in Sand
Khari, Mahdy; Kassim, Khairul Anuar; Adnan, Azlan
2013-01-01
Grouped and single pile behavior differs owing to the impacts of the pile-to-pile interaction. Ultimate lateral resistance and lateral subgrade modulus within a pile group are known as the key parameters in the soil-pile interaction phenomenon. In this study, a series of experimental investigation was carried out on single and group pile subjected to monotonic lateral loadings. Experimental investigations were conducted on twelve model pile groups of configurations 1 × 2, 1 × 3, 2 × 2, 3 × 3, and 3 × 2 for embedded length-to-diameter ratio l/d = 32 into loose and dense sand, spacing from 3 to 6 pile diameter, in parallel and series arrangement. The tests were performed in dry sand from Johor Bahru, Malaysia. To reconstruct the sand samples, the new designed apparatus, Mobile Pluviator, was adopted. The ultimate lateral load is increased 53% in increasing of s/d from 3 to 6 owing to effects of sand relative density. An increasing of the number of piles in-group decreases the group efficiency owing to the increasing of overlapped stress zones and active wedges. A ratio of s/d more than 6d is large enough to eliminate the pile-to-pile interaction and the group effects. It may be more in the loose sand. PMID:24453900
Long-term behaviour of timber structures in torrent control
NASA Astrophysics Data System (ADS)
Rickli, Christian; Graf, Frank
2014-05-01
Timber is widely used for protection measures in torrent control. However, life span of woody constructions such as timber check dams is limited due to fungal decay. However, only sparse scientific information is available on the long-term behaviour of timber structures and the colonisation with decay fungi. Related to this, in practice a controversial discussion has been going on if either Norway Spruce (Picea abies) or Silver Fir (Abies alba) is more enduring and if bark removal increases resistance against fungal decay. In order to going into this matter a series of 15 timber check dams built in 1996 has been monitored. The constructions were alternatively realised with Norway Spruce and Silver Fir, half of them each with remaining and removed bark, respectively. The scientific investigations included the documentation of colonisation with rot fungi and the identification of decayed zones with a simple practical approach as well as based on drilling resistance. Colonisation by decay fungi started three years after construction (e.g. Gloeophyllum sepiarium), detecting two years later first parts with reduced wood resistance. Sixteen years after construction decay was found on all check dams but two. Wood quality was markedly better in watered sections compared to the occasionally dry lateral abutment sections. Taking the whole check dams into consideration, slightly more decay was detected in Norway Spruce compared to logs in Silver Fir and both the practical approach and the drilling resistance measurement yielded in more defects on logs without bark. However, due to limited number of replications and fungal data, it was not possible to statistically verify these results. Statistical analysis was restricted to the drilling resistance data and fruit-bodies of decay fungi of the uppermost log of each check dam. Based on this limited analysis significant differences in the effect on the drilling resistance were found for watered sections and lateral abutments, brown and white rot as well as fir with and without bark. Taking further into account that brown rot reduces wood strength faster than white rot, it may be speculated that spruce logs without bark and fir logs with bark are more resistant against fungal decay compared to logs of spruce with and fir without bark, respectively. However, this has to be treated with caution as only the uppermost logs were considered, the observation period was only 15 years and the relative abundance of the most important decay fungi considerably varied between as well as within the check dams. Consequently, for statistically sound and well-funded recommendations further investigations over a longer period are indispensable.
NASA Astrophysics Data System (ADS)
Tamai, Toshiyuki; Teramoto, Shuntarou; Kimura, Makoto
Steel pipe piles with wings installed in soil cement column is a composite foundation of pile consisting of soil improvement with cement and steel pipe with wings. This type of pile shows higher vertical bearing capacity when compared to steel pipe piles that are installed without soil cement. It is thought the wings contribute to higher bearing capacity of this type of piles. The wings are also thought to play the role of structural unification of pile foundations and load transfer. In this study, model test and 3D elastic finite element analysis was carried out in order to elucidate the effect of wings on the structural unification of pile foundation and the load transfer mechanism. Firstly, the model test was carried out in order to grasp the influence of pile with and without wings, the shape of wings of the pile and the unconfined compression strength of the soil cement on the structural unification of the pile foundation. The numerical analysis of the model test was then carried out on the intermediate part of the pile foundation with wings and mathematical model developed. Finally load tran sfer mechanism was checked for the entire length of the pile through this mathematical model and the load sharing ratio of the wings and stress distribution occurring in the soil cement clarified. In addition, the effect of the wing interval on the structural unification of the pile foundation and load transfer was also checked and clarified.
Optimizing the use of the thermal integrity system for evaluating auger-cast piles [summary].
DOT National Transportation Integrated Search
2016-07-01
Auger-cast-in-place (ACIP) piles offer an efficient method of constructing and installing piles, : but because the ACIP process is essentially blind and the configuration of the final pile cannot be : assured, applications for ACIP piles have been li...
40 CFR 429.140 - Applicability; description of the particleboard manufacturing subcategory.
Code of Federal Regulations, 2010 CFR
2010-07-01
... particleboard manufacturing subcategory. 429.140 Section 429.140 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS TIMBER PRODUCTS PROCESSING POINT SOURCE CATEGORY Particleboard Manufacturing Subcategory § 429.140 Applicability; description of the particleboard...
Global sustainable timber supply and demand
Peter J. Ince
2010-01-01
Industrial timber use has provided timber revenue that has helped make timber supply and demand more sustainable in the leading timber producing regions of the world. Sustainable development implies not consuming more resources today than we can replace tomorrow, but sustainable forest management implies more than merely a non-declining supply of timber. Forests as a...
The 1993 RPA timber assessment update
Richard W. Haynes; Darius M. Adams; John R. Mills
1995-01-01
This update reports changes in the Nation's timber resource since the 1989 RPA timber assessment. The timber resource situation is analyzed to provide projections for future cost and availability of timber products to meet demands. Prospective trends in demands for and supplies of timber, and the factors that affect these trends are examined. These include changes...
Timber Mountain Precipitation Monitoring Station
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lyles, Brad; McCurdy, Greg; Chapman, Jenny
2012-01-01
A precipitation monitoring station was placed on the west flank of Timber Mountain during the year 2010. It is located in an isolated highland area near the western border of the Nevada National Security Site (NNSS), south of Pahute Mesa. The cost of the equipment, permitting, and installation was provided by the Environmental Monitoring Systems Initiative (EMSI) project. Data collection, analysis, and maintenance of the station during fiscal year 2011 was funded by the U.S. Department of Energy, National Nuclear Security Administration, Nevada Site Office Environmental Restoration, Soils Activity. The station is located near the western headwaters of Forty Milemore » Wash on the Nevada Test and Training Range (NTTR). Overland flows from precipitation events that occur in the Timber Mountain high elevation area cross several of the contaminated Soils project CAU (Corrective Action Unit) sites located in the Forty Mile Wash watershed. Rain-on-snow events in the early winter and spring around Timber Mountain have contributed to several significant flow events in Forty Mile Wash. The data from the new precipitation gauge at Timber Mountain will provide important information for determining runoff response to precipitation events in this area of the NNSS. Timber Mountain is also a groundwater recharge area, and estimation of recharge from precipitation was important for the EMSI project in determining groundwater flowpaths and designing effective groundwater monitoring for Yucca Mountain. Recharge estimation additionally provides benefit to the Underground Test Area Sub-project analysis of groundwater flow direction and velocity from nuclear test areas on Pahute Mesa. Additionally, this site provides data that has been used during wild fire events and provided a singular monitoring location of the extreme precipitation events during December 2010 (see data section for more details). This letter report provides a summary of the site location, equipment, and data collected in fiscal year 2011.« less
Optimizing the use of the thermal integrity system for evaluating auger-cast piles : final report.
DOT National Transportation Integrated Search
2016-07-01
Auger-cast piles (sometimes called auger-cast-in-place, or ACIP, piles) are a subset of the larger : category of deep foundation elements known as bored piles. Although similar to drilled shafts at first : glance, ACIP piles differ in the constructio...
Use of pile driving analysis for assessment of axial load capacity of piles : [technical summary].
DOT National Transportation Integrated Search
2012-01-01
The dynamic response of a pile during driving is very : complex, involving the interactions of the hammer, cushion, : pile and soil during application of an impact load. : The first analysis aimed at simulating a hammer blow on : a pile was published...
40 CFR 264.554 - Staging piles.
Code of Federal Regulations, 2010 CFR
2010-07-01
... staging pile? A staging pile is an accumulation of solid, non-flowing remediation waste (as defined in...) [Reserved] (b) When may I use a staging pile? You may use a staging pile to store hazardous remediation waste (or remediation waste otherwise subject to land disposal restrictions) only if you follow the...
Foundation stiffness in the linear modeling of wind turbines
NASA Astrophysics Data System (ADS)
Chiang, Chih-Hung; Yu, Chih-Peng; Chen, Yan-Hao; Lai, Jiunnren; Hsu, Keng-Tsang; Cheng, Chia-Chi
2017-04-01
Effects of foundation stiffness on the linear vibrations of wind turbine systems are of concerns for both planning and construction of wind turbine systems. Current study performed numerical modeling for such a problem using linear spectral finite elements. The effects of foundation stiffness were investigated for various combinations of shear wave velocity of soil, size of tower base plate, and pile length. Multiple piles are also included in the models such that the foundation stiffness can be analyzed more realistically. The results indicate that the shear wave velocity of soil and the size of tower base plate have notable effects on the dominant frequency of the turbine-tower system. The larger the lateral dimension, the stiffer the foundation. Large pile cap and multiple spaced piles result in higher stiffness than small pile cap and a mono-pile. The lateral stiffness of a mono-pile mainly depends on the shear wave velocity of soil with the exception for a very short pile that the end constraints may affect the lateral vibration of the superstructure. Effective pile length may be determined by comparing the simulation results of the frictional pile to those of the end-bearing pile.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 25 2010-07-01 2010-07-01 false [Reserved] 264.255 Section 264.255 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES Waste Piles § 264.255...
40 CFR 411.34 - Pretreatment standards for existing sources.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 29 2014-07-01 2012-07-01 true Pretreatment standards for existing sources. 411.34 Section 411.34 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS CEMENT MANUFACTURING POINT SOURCE CATEGORY Materials Storage Piles Runoff...
40 CFR 411.36 - Pretreatment standards for new sources.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 29 2011-07-01 2009-07-01 true Pretreatment standards for new sources. 411.36 Section 411.36 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS CEMENT MANUFACTURING POINT SOURCE CATEGORY Materials Storage Piles Runoff...
40 CFR 411.34 - Pretreatment standards for existing sources.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 30 2012-07-01 2012-07-01 false Pretreatment standards for existing sources. 411.34 Section 411.34 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS CEMENT MANUFACTURING POINT SOURCE CATEGORY Materials Storage Piles Runoff...
40 CFR 411.36 - Pretreatment standards for new sources.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 29 2014-07-01 2012-07-01 true Pretreatment standards for new sources. 411.36 Section 411.36 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS CEMENT MANUFACTURING POINT SOURCE CATEGORY Materials Storage Piles Runoff...
40 CFR 411.36 - Pretreatment standards for new sources.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 30 2013-07-01 2012-07-01 true Pretreatment standards for new sources. 411.36 Section 411.36 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS CEMENT MANUFACTURING POINT SOURCE CATEGORY Materials Storage Piles Runoff...
40 CFR 411.34 - Pretreatment standards for existing sources.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 30 2013-07-01 2012-07-01 true Pretreatment standards for existing sources. 411.34 Section 411.34 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS CEMENT MANUFACTURING POINT SOURCE CATEGORY Materials Storage Piles Runoff...
40 CFR 411.36 - Pretreatment standards for new sources.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 30 2012-07-01 2012-07-01 false Pretreatment standards for new sources. 411.36 Section 411.36 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS CEMENT MANUFACTURING POINT SOURCE CATEGORY Materials Storage Piles Runoff...
40 CFR 411.34 - Pretreatment standards for existing sources.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 29 2011-07-01 2009-07-01 true Pretreatment standards for existing sources. 411.34 Section 411.34 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS CEMENT MANUFACTURING POINT SOURCE CATEGORY Materials Storage Piles Runoff...
40 CFR 411.34 - Pretreatment standards for existing sources.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 28 2010-07-01 2010-07-01 true Pretreatment standards for existing sources. 411.34 Section 411.34 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS CEMENT MANUFACTURING POINT SOURCE CATEGORY Materials Storage Piles Runoff...
40 CFR 411.36 - Pretreatment standards for new sources.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 28 2010-07-01 2010-07-01 true Pretreatment standards for new sources. 411.36 Section 411.36 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS CEMENT MANUFACTURING POINT SOURCE CATEGORY Materials Storage Piles Runoff...
An analysis of the timber situation in Alaska: 1970-2010.
Richard W. Haynes; David J. Brooks
1990-01-01
Current conditions in Alaska timber markets are reviewed relative to the past two decades. Major issues in the outlook for Alaska timber markets are considered. Recent studies are used to develop projections of Alaska timber products output, timber harvest, and timber harvest by owner. The assumptions these projections depend on include the level of harvest on Native...
The Value of Timber Inventory Information.
B.E. Borders; W.M. Harrison; M.L. Clutter; B.D. Shiver; R.A. Souter
2008-01-01
Timber inventory data is the basis for many monetary transactions related to timber and timberland sale and (or) purchase as well as for development of timber management plans. The value of such data is well known and much appreciated for sale and (or) purchase of standing merchantable timber. Unfortunatley, the value of timber inventory data for planning...
Information transfer during the timber transaction period in West Virginia. USA
David W. McGill; Daniel J. Magill; James Kochenderfer; W. Mark Ford; Tom Schuler
2006-01-01
Timber harvesting has long-lasting impacts on the productivity and aesthetics of private forests. In many instances, landowners who possess high quality timber are at a competitive disadvantage during timber transactions--the time between a decision by the landowner to sell timber and the completion of the timber harvesting operation--as they may lack understanding of...
ERIC Educational Resources Information Center
Branca, Mario; Quidacciolu, Rossana G.; Soletta, Isabella
2013-01-01
The construction of a voltaic pile (battery) is a simple laboratory activity that commemorates the invention of this important device and is of great help in teaching physics. The voltaic pile is often seen as a scientific toy, with the "pile" being constructed from fruit. These toys use some strips of copper and zinc inserted in a piece…
Pile mixing increases greenhouse gas emissions during composting of dairy manure
USDA-ARS?s Scientific Manuscript database
The effect of pile mixing on greenhouse gas (GHG) emissions from stored dairy manure was determined using large flux chambers designed to completely cover pilot-scale manure piles. GHG emissions from piles that were mixed four times during the 80 day trial were about 20% higher than unmixed piles. ...
Zhang, Lihua; Zeng, Guangming; Dong, Haoran; Chen, Yaoning; Zhang, Jiachao; Yan, Ming; Zhu, Yuan; Yuan, Yujie; Xie, Yankai; Huang, Zhenzhen
2017-04-01
This study evaluated the influence of silver nanoparticles (AgNPs) on evolutions of organic matter and nitrogen during co-composting of sewage sludge and agricultural waste. Two co-composting piles were conducted, one was treated without AgNPs (pile 1) and the other with AgNPs (pile 2). Results showed that the AgNPs affected the quality of final composts. Less organic matter (OM) losses were determined in pile 2 (57.96%) than pile 1 (61.66%). 27.22% and 30.1% of the initial total organic matter (TOC) was decomposed in pile 1 and pile 2, respectively. The final water soluble carbon (WSC) concentration in pile 2 was 23559.27mg/kg DW compost which was significantly lower than pile 1 (25642.75mg/kg DW compost). Changes of different forms of nitrogen in the two piles showed that AgNPs could reduce the losses of TN but increase the losses of mineral N. Copyright © 2017 Elsevier Ltd. All rights reserved.
A research for Class II defect Bored Pile’s Accept Criteria: A case of Penang Second Marine bridge
NASA Astrophysics Data System (ADS)
Huang, Kang
2018-03-01
The aim of this preliminary research is to study the accept criteria of class II bored pile with subtle defect. According to a detailed comparison of the existed different standards, Chinese ones are more applicable especially for the large diameter bored piles. Through the concrete coring at pile No P25-03 of this case and the comparison to the actual calculation, the Class II pile’s defects were very minor. Comparison was also made for the effects on pile structural capacities before and after repair of the defects. the feasible repair proposal may bring forward to more defects to the piles. The Class II piles don’t need any further repairation when piles have typical of similar character and sonic logging test result with P25-03‘s one. For other Class II piles with some differences in characters, verification is needed through further concrete coring on the pile. The recommendation of this research could be adopted for the similar huge marine structures which installed large diameter bored piles.
Timber products output and timber harvests in Alaska: projections for 1989-2010.
David J. Brooks; Richard W. Haynes
1990-01-01
Projections of Alaska timber products output and timber harvest by owner were developed by using a detailed, trend-based analysis. Historical data for 1965-88 were the basis for projections for 1989-2010. Projections of timber products output for each major product (export logs, sawn wood, and market pulp) were used to compute the derived demand for timber. The...
Numerical Analysis of Helical Pile-Soil Interaction under Compressive Loads
NASA Astrophysics Data System (ADS)
Polishchuk, A. I.; Maksimov, F. A.
2017-11-01
The results of the field tests of full-scale steel helical piles in clay soils intended for prefabricated temporary buildings foundations are presented in this article. The finite element modeling was used for the evaluation of stress distribution of the clay soil around helical piles. An approach of modeling of the screw-pile geometry has been proposed through the Finite Element Analysis. Steel helical piles with a length of 2.0 m, shaft diameter of 0.108 m and a blade diameter of 0.3 m were used in the experiments. The experiments have shown the efficiency of double-bladed helical piles in the clay soils compared to single-bladed piles. It has been experimentally established that the introduction of the second blade into the pile shaft provides an increase of the bearing capacity in clay soil up to 30% compared to a single-bladed helical pile with similar geometrical dimensions. The numerical results are compared with the measurements obtained by a large scale test and the bearing capacity has been estimated. It has been found that the model results fit the field results. For a double-bladed helical pile it was revealed that shear stresses upon pile loading are formed along the lateral surface forming a cylindrical failure surface.
Timber resources of northern interior California, 1970.
Charles L. Bolsinger
1976-01-01
This report summarizes a timber resource inventory in Lassen, Modoc, Siskiyou, Shasta, and Trinity Counties, California. Included are detailed tables of forest area, timber volume, growth, mortality, and removals and a discussion of the current timber resource and timber industry situation.
Estimating volume, biomass, and potential emissions of hand-piled fuels
Clinton S. Wright; Cameron S. Balog; Jeffrey W. Kelly
2009-01-01
Dimensions, volume, and biomass were measured for 121 hand-constructed piles composed primarily of coniferous (n = 63) and shrub/hardwood (n = 58) material at sites in Washington and California. Equations using pile dimensions, shape, and type allow users to accurately estimate the biomass of hand piles. Equations for estimating true pile volume from simple geometric...
Decomposition rates for hand-piled fuels
Clinton S. Wright; Alexander M. Evans; Joseph C. Restaino
2017-01-01
Hand-constructed piles in eastern Washington and north-central New Mexico were weighed periodically between October 2011 and June 2015 to develop decay-rate constants that are useful for estimating the rate of piled biomass loss over time. Decay-rate constants (k) were determined by fitting negative exponential curves to time series of pile weight for each site. Piles...
Evaluation of Pile Response Due to Liquefaction - Induced Lateral Spreading of the Ground
DOT National Transportation Integrated Search
1995-01-01
In order to obtain regional perspectives on the major problems and issues to be addressed in the International Border Crossing Study, required by Congress in Section 6015 of the Intermodal Surface Transportation Efficiency Act of 1991, a series of ni...
40 CFR 411.35 - Standards of performance for new sources.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 30 2012-07-01 2012-07-01 false Standards of performance for new sources. 411.35 Section 411.35 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS CEMENT MANUFACTURING POINT SOURCE CATEGORY Materials Storage Piles Runoff...
40 CFR 411.35 - Standards of performance for new sources.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 29 2014-07-01 2012-07-01 true Standards of performance for new sources. 411.35 Section 411.35 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS CEMENT MANUFACTURING POINT SOURCE CATEGORY Materials Storage Piles Runoff...
40 CFR 411.35 - Standards of performance for new sources.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 29 2011-07-01 2009-07-01 true Standards of performance for new sources. 411.35 Section 411.35 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS CEMENT MANUFACTURING POINT SOURCE CATEGORY Materials Storage Piles Runoff...
40 CFR 411.35 - Standards of performance for new sources.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 30 2013-07-01 2012-07-01 true Standards of performance for new sources. 411.35 Section 411.35 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS CEMENT MANUFACTURING POINT SOURCE CATEGORY Materials Storage Piles Runoff...
40 CFR 265.254 - Design and operating requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
....254 Section 265.254 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES Waste Piles § 265.254 Design and operating requirements. The owner or operator of each...
Attenuation of pressure dips underneath piles of spherocylinders.
Zhao, Haiyang; An, Xizhong; Gou, Dazhao; Zhao, Bo; Yang, Runyu
2018-05-30
The discrete element method (DEM) was used to simulate the piling of rod-like (elongated sphero-cylindrical) particles, mainly focusing on the effect of particle shape on the structural and force properties of the piles. In this work, rod-like particles of different aspect ratios were discharged on a flat surface to form wedge-shaped piles. The surface properties of the piles were characterized in terms of angle of repose and stress at the bottom of the piles. The results showed that the rise of the angle of repose became slower with the increase of particle aspect ratio. The pressure dip underneath the piles reached the maximum when the particle aspect ratio was around 1.6, beyond which the pressure dip phenomenon became attenuated. Both the pressure dip and the shear stress dip were quantitatively examined. The structure and forces inside the piles were further analyzed to understand the change in pressure dip, indicating that "bridging" or "arching" structures within the piles were the cause of the pressure dip.
NASA Astrophysics Data System (ADS)
Okajima, Kenji; Imai, Junichi; Tanaka, Tadatsugu; Iida, Toshiaki
Damage to piles in the liquefied ground is frequently reported. Buckling by the excess vertical load could be one of the causes of the pile damage, as well as the lateral flow of the ground and the lateral load at the pile head. The buckling mechanism is described as a complicated interaction between the pile deformation by the vertical load and the earth pressure change cased by the pile deformation. In this study, series of static buckling model tests of a pile were carried out in dried sand ground with various thickness of the layer. Finite element analysis was applied to the test results to verify the effectiveness of the elasto-plastic finite element analysis combining the implicit-explicit mixed type dynamic relaxation method with the return mapping method to the pile buckling problems. The test results and the analysis indicated the possibility that the buckling load of a pile decreases greatly where the thickness of the layer increases.
Pile mixing increases greenhouse gas emissions during composting of dairy manure.
Ahn, H K; Mulbry, W; White, J W; Kondrad, S L
2011-02-01
The effect of pile mixing on greenhouse gas (GHG) emissions during dairy manure composting was determined using large flux chambers designed to completely cover replicate pilot-scale compost piles. GHG emissions from compost piles that were mixed four times during the 80 day trial were approximately 20% higher than emissions from unmixed (static) piles. For both treatments, carbon dioxide (CO(2)), methane (CH(4)), and nitrous oxide (N(2)O) accounted for 75-80%, 18-21%, and 2-4% of GHG emissions, respectively. Seventy percent of CO(2) emissions and 95% of CH(4) emissions from all piles occurred within first 23 days. By contrast, 80-95% of N(2)O emissions occurred after this period. Mixed and static piles released 2 and 1.6 kg GHG (CO(2)-Eq.) for each kg of degraded volatile solids (VS), respectively. Our results suggest that to minimize GHG emissions, farmers should store manure in undisturbed piles or delay the first mixing of compost piles for approximately 4 weeks. Published by Elsevier Ltd.
NASA Astrophysics Data System (ADS)
Sharma, Gaurav; Puri, Nitin K.; Kumar, Pravin; Nandi, T.
2018-03-01
The versatility of X-ray absorption technique is experimentally employed for enhancing the detector resolution and to rejuvenate the low probable transitions obscured in the pile-up region, during a beam-foil spectroscopy experiment. The multiple aluminum absorber layers (10 μm each) are used to suppress the pile-up contribution drastically and to restore a weak transition which is about 1.38 × 104 times weaker than a one-electron-one-photon transitions viz. Kα and Khα. The weak line is possibly originating from a two-electron-one-photon transition in He-like Ti. Further, the transitions, which were obscured in the spectra due to high intensity ratio, are revived by dissimilar line intensity attenuation using this technique. The measured lifetimes of Kα line with and without intensity attenuation match well within error bar. The present technique finds potential implications in understanding the structure of multiple-core-vacant ions and other low cross section processes in ion-solid collisions.
Response of shallow geothermal energy pile from laboratory model tests
NASA Astrophysics Data System (ADS)
Marto, A.; Amaludin, A.
2015-09-01
In shallow geothermal energy pile systems, the thermal loads from the pile, transferred and stored in the soil will cause thermally induced settlement. This factor must be considered in the geotechnical design process to avoid unexpected hazards. Series of laboratory model tests were carried out to study the behaviour of energy piles installed in kaolin soil, subjected to thermal loads and a combination of axial and thermal loads (henceforth known as thermo-axial loads). Six tests which included two thermal load tests (35°C and 40°C) and four thermo-axial load tests (100 N and 200 N, combined with 35°C and 40°C thermal loads) were conducted. To simulate the behaviour of geothermal energy piles during its operation, the thermo-axial tests were carried out by applying an axial load to the model pile head, and a subsequent application of thermal load. The model soil was compacted at 90% maximum dry density and had an undrained shear strength of 37 kPa, thus classified as having a firm soil consistency. The behaviour of model pile, having the ultimate load capacity of 460 N, was monitored using a linear variable displacement transducer, load cell and wire thermocouple, to measure the pile head settlement, applied axial load and model pile temperature. The acquired data from this study was used to define the thermo-axial response characteristics of the energy pile model. In this study, the limiting settlement was defined as 10% of the model pile diameter. For thermal load tests, higher thermal loads induced higher values of thermal settlement. At 40°C thermal load an irreversible settlement was observed after the heating and cooling cycle was applied to the model pile. Meanwhile, the pile response to thermo-axial loads were attributed to soil consistency and the magnitude of both the axial and thermal loads applied to the pile. The higher the thermoaxial loads, the higher the settlements occurred. A slight hazard on the model pile was detected, since the settlement occurred was greater than the limiting value when the pile was loaded with thermo-axial loads of 40°C and 200 N. It is therefore recommended that the global factor of safety to be applied for energy pile installed in firm soil should be more than 2.3 to prevent any hazard to occur in the future, should the pile also be subjected to thermal load of 40°C or greater.
Study on the measures of tunnels side-crossing bridge based on sheltering effects of isolation piles
NASA Astrophysics Data System (ADS)
Tang, Jian; Liu, Jun yan; Liu, Yan
2017-08-01
Based on the transit line 3, we studied the effect of the bridge piles crossed closely from the side by the shield tunnel. Using the three-dimensional finite element numerical analysis software Midas GTS/NX, we analyzed the effect of shield tunnel on pile deformation, statistics are obtained that under the condition of pile, subgrade reinforcement and ground changes. The calculation results show that in the condition of reinforcement, the new tunnel shield crossing through the pile caused longitudinal disturbance of the tunnel surrounding strata along the tunnel, where the soil over the area is within a certain range of pile and settlement deformation of surface subsidence occurs, changing the surface roughly to the shape of “V”. The maximum value appears above the shield tunnel and the value is high. In combination with engineering geology, hydrogeology and environment factors, this paper adopted isolation pile reinforcement to the pile, and the simulated results show that, pile settlement was significantly reduced under the condition of pile reinforcement. The calculation results show the rationality of the reinforcement scheme to a certain extent, which provides a theoretical basis for the similar tunnel.
Pile Model Tests Using Strain Gauge Technology
NASA Astrophysics Data System (ADS)
Krasiński, Adam; Kusio, Tomasz
2015-09-01
Ordinary pile bearing capacity tests are usually carried out to determine the relationship between load and displacement of pile head. The measurement system required in such tests consists of force transducer and three or four displacement gauges. The whole system is installed at the pile head above the ground level. This approach, however, does not give us complete information about the pile-soil interaction. We can only determine the total bearing capacity of the pile, without the knowledge of its distribution into the shaft and base resistances. Much more information can be obtained by carrying out a test of instrumented pile equipped with a system for measuring the distribution of axial force along its core. In the case of pile model tests the use of such measurement is difficult due to small scale of the model. To find a suitable solution for axial force measurement, which could be applied to small scale model piles, we had to take into account the following requirements: - a linear and stable relationship between measured and physical values, - the force measurement accuracy of about 0.1 kN, - the range of measured forces up to 30 kN, - resistance of measuring gauges against aggressive counteraction of concrete mortar and against moisture, - insensitivity to pile bending, - economical factor. These requirements can be fulfilled by strain gauge sensors if an appropriate methodology is used for test preparation (Hoffmann [1]). In this paper, we focus on some aspects of the application of strain gauge sensors for model pile tests. The efficiency of the method is proved on the examples of static load tests carried out on SDP model piles acting as single piles and in a group.
36 CFR 223.131 - Applicability.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 36 Parks, Forests, and Public Property 2 2013-07-01 2013-07-01 false Applicability. 223.131 Section 223.131 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS...
Code of Federal Regulations, 2012 CFR
2012-07-01
... 36 Parks, Forests, and Public Property 2 2012-07-01 2012-07-01 false Debarment. 223.136 Section 223.136 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS...
36 CFR 223.131 - Applicability.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 36 Parks, Forests, and Public Property 2 2012-07-01 2012-07-01 false Applicability. 223.131 Section 223.131 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS...
Code of Federal Regulations, 2011 CFR
2011-07-01
... 36 Parks, Forests, and Public Property 2 2011-07-01 2011-07-01 false Suspension. 223.141 Section 223.141 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS...
Code of Federal Regulations, 2014 CFR
2014-07-01
... 36 Parks, Forests, and Public Property 2 2014-07-01 2014-07-01 false Compliance. 223.13 Section 223.13 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS General...
Code of Federal Regulations, 2013 CFR
2013-07-01
... 36 Parks, Forests, and Public Property 2 2013-07-01 2013-07-01 false Debarment. 223.136 Section 223.136 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS...
Code of Federal Regulations, 2011 CFR
2011-07-01
... 36 Parks, Forests, and Public Property 2 2011-07-01 2011-07-01 false Debarment. 223.136 Section 223.136 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS...
Code of Federal Regulations, 2012 CFR
2012-07-01
... 36 Parks, Forests, and Public Property 2 2012-07-01 2012-07-01 false Suspension. 223.141 Section 223.141 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS...
Code of Federal Regulations, 2014 CFR
2014-07-01
... 36 Parks, Forests, and Public Property 2 2014-07-01 2014-07-01 false Debarment. 223.136 Section 223.136 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS...
Code of Federal Regulations, 2012 CFR
2012-07-01
... 36 Parks, Forests, and Public Property 2 2012-07-01 2012-07-01 false Compliance. 223.13 Section 223.13 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS General...
Code of Federal Regulations, 2013 CFR
2013-07-01
... 36 Parks, Forests, and Public Property 2 2013-07-01 2013-07-01 false Definitions. 223.133 Section 223.133 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS...
36 CFR 223.131 - Applicability.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 36 Parks, Forests, and Public Property 2 2014-07-01 2014-07-01 false Applicability. 223.131 Section 223.131 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS...
Code of Federal Regulations, 2013 CFR
2013-07-01
... 36 Parks, Forests, and Public Property 2 2013-07-01 2013-07-01 false Compliance. 223.13 Section 223.13 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS General...
Code of Federal Regulations, 2013 CFR
2013-07-01
... 36 Parks, Forests, and Public Property 2 2013-07-01 2013-07-01 false Suspension. 223.141 Section 223.141 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS...
40 CFR 429.144 - New source performance standards (NSPS).
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 29 2010-07-01 2010-07-01 false New source performance standards (NSPS). 429.144 Section 429.144 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS TIMBER PRODUCTS PROCESSING POINT SOURCE CATEGORY Particleboard Manufacturing...
ETR, TRA642. EASTWEST SECTION, LOOKING NORTH. PATH OF COOLING WATER ...
ETR, TRA-642. EAST-WEST SECTION, LOOKING NORTH. PATH OF COOLING WATER PIPE TUNNEL. WORKING AND STORAGE CANAL. SUB-PILE ROOM. CONTROL ROD ACCESS ROOM. FLOOR NAMES. (THIS WAS A CONCEPT DRAWING.) KAISER ETR-5528-MTR-642-A-5, 11/1955. INL INDEX NO. 532-0642-00-486-100913. REV. 0. - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
Integrity Testing of Pile Cover Using Distributed Fibre Optic Sensing
Rui, Yi; Kechavarzi, Cedric; O’Leary, Frank; Barker, Chris; Nicholson, Duncan; Soga, Kenichi
2017-01-01
The integrity of cast-in-place foundation piles is a major concern in geotechnical engineering. In this study, distributed fibre optic sensing (DFOS) cables, embedded in a pile during concreting, are used to measure the changes in concrete curing temperature profile to infer concrete cover thickness through modelling of heat transfer processes within the concrete and adjacent ground. A field trial was conducted at a high-rise building construction site in London during the construction of a 51 m long test pile. DFOS cables were attached to the reinforcement cage of the pile at four different axial directions to obtain distributed temperature change data along the pile. The monitoring data shows a clear development of concrete hydration temperature with time and the pattern of the change varies due to small changes in concrete cover. A one-dimensional axisymmetric heat transfer finite element (FE) model is used to estimate the pile geometry with depth by back analysing the DFOS data. The results show that the estimated pile diameter varies with depth in the range between 1.40 and 1.56 m for this instrumented pile. This average pile diameter profile compares well to that obtained with the standard Thermal Integrity Profiling (TIP) method. A parametric study is conducted to examine the sensitivity of concrete and soil thermal properties on estimating the pile geometry. PMID:29257094
Integrity Testing of Pile Cover Using Distributed Fibre Optic Sensing.
Rui, Yi; Kechavarzi, Cedric; O'Leary, Frank; Barker, Chris; Nicholson, Duncan; Soga, Kenichi
2017-12-19
The integrity of cast-in-place foundation piles is a major concern in geotechnical engineering. In this study, distributed fibre optic sensing (DFOS) cables, embedded in a pile during concreting, are used to measure the changes in concrete curing temperature profile to infer concrete cover thickness through modelling of heat transfer processes within the concrete and adjacent ground. A field trial was conducted at a high-rise building construction site in London during the construction of a 51 m long test pile. DFOS cables were attached to the reinforcement cage of the pile at four different axial directions to obtain distributed temperature change data along the pile. The monitoring data shows a clear development of concrete hydration temperature with time and the pattern of the change varies due to small changes in concrete cover. A one-dimensional axisymmetric heat transfer finite element (FE) model is used to estimate the pile geometry with depth by back analysing the DFOS data. The results show that the estimated pile diameter varies with depth in the range between 1.40 and 1.56 m for this instrumented pile. This average pile diameter profile compares well to that obtained with the standard Thermal Integrity Profiling (TIP) method. A parametric study is conducted to examine the sensitivity of concrete and soil thermal properties on estimating the pile geometry.
Evaluation of pile repair splice design.
DOT National Transportation Integrated Search
2015-12-01
The Oregon Department of Transportation (ODOT) Major Bridge Maintenance Engineer has proposed an in-house pile repair scheme for decayed piles. This repair scheme involves removing decayed area within the pile leaving a 2 outer shell, filling it u...
Multisignal detecting system of pile integrity testing
NASA Astrophysics Data System (ADS)
Liu, Zuting; Luo, Ying; Yu, Shihai
2002-05-01
The low strain reflection wave method plays a principal rule in the integrating detection of base piles. However, there are some deficiencies with this method. For example, there is a blind area of detection on top of the tested pile; it is difficult to recognize the defects at deep-seated parts of the pile; there is still the planar of 3D domino effect, etc. It is very difficult to solve these problems only with the single-transducer pile integrity testing system. A new multi-signal piles integrity testing system is proposed in this paper, which is able to impulse and collect signals on multiple points on top of the pile. By using the multiple superposition data processing method, the detecting system can effectively restrain the interference and elevate the precision and SNR of pile integrity testing. The system can also be applied to the evaluation of engineering structure health.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Roodriguez, F.H.
1984-02-01
In October 1982, Conoco Irian Jaya as operator: and partners: Pertamina, Inpex Bintuni Limited, and Moeco Irian Jaya Company, mobilized construction equipment from Singapore to the KBS ''A'' contract area in Irian Jaya, Indonesia for the purpose of constructing a base camp and drill three exploratory sites. What made this construction effort different from others previously used in Irian Jaya; was that it incorporated several new and unique features, namely: a turnkey approach to construction; that is Conoco providing complete set of specifications and conditions with contractor assuming risks for a lump sum payment; special equipment designed by contractor formore » Irian Jaya operations; an incentive to co pensate or penalize contractor for helicopter hours flown below or above a predetermined number; structural steel pile platform designs for two swamp locations (Ayot and Aum), as opposed to the more conventional corduroy timber log-plank arrangement; and drilling rig pads designed for specific heli-rig with limited extra space. All work was successfully completed within the time frame stipulated in the contract, that is five months from the time the contractor was notified to begin mobilization of equipment, materials and personnel.« less
Timber Products Supply and Demand
Jeffrey P. Prestemon; Robert C. Abt
2002-01-01
This chapter describes historical, current, and projected timber inventories and timber product outputs from southern forests. It also attempts to place these quantities in national and international perspectives. Timber is the most valuable commercial commodity taken from most forests, and its removal strongly influences the character of those forests. Timber is...
40 CFR 265.254 - Design and operating requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 26 2011-07-01 2011-07-01 false Design and operating requirements. 265.254 Section 265.254 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... DISPOSAL FACILITIES Waste Piles § 265.254 Design and operating requirements. The owner or operator of each...
50 CFR 27.92 - Private structures.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false Private structures. 27.92 Section 27.92... NATIONAL WILDLIFE REFUGE SYSTEM PROHIBITED ACTS Other Disturbing Violations § 27.92 Private structures. No..., pier, dock, fence, wall, pile, anchorage, or other structure or obstruction in any national wildlife...
Soil heating during burning of forest slash piles and wood piles
Matt D. Busse; Carol J. Shestak; Ken R. Hubbert
2013-01-01
Pile burning of conifer slash is a common fuel reduction practice in forests of the western United States that has a direct, yet poorly quantified effect on soil heating. To address this knowledge gap, we measured the heat pulse beneath hand-built piles ranging widely in fuel composition and pile size in sandy-textured soils of the Lake Tahoe Basin. The soil heat pulse...
Monitoring moisture content, temperature, and humidity in whole-tree pine chip piles
John Klepac; Dana Mitchell; Jason Thompson
2015-01-01
Two whole-tree chip piles were monitored for moisture content, temperature, and relative humidity from October 8th, 2010 to March 16th, 2011 at a location in south Alabama. Initial moisture content samples were collected immediately after chips were delivered to the study location on October 8th for Pile 1 and October 22nd for Pile 2. During pile construction, Lascar...
Some Remarks on Foundation Pile Testing Procedures
NASA Astrophysics Data System (ADS)
Rybak, Jarosław
2017-10-01
This work presents the review of pile capacity testing techniques. In an overview, the key points in pile designing are: determination of the appropriate computational schemes, reliable data on loads and the properties of structural materials (in particular, of the soil mass, which is marked by the greatest variability). The procedure of constructing a pile foundation should include: carrying out soil tests in the scope that ensures safe designing, selecting a piling technology that is relevant both to geotechnical conditions and expected loads, drafting a piling design together with the design of load tests, setting up a testing station for further load tests, static and/or dynamic tests of pile load capacity, preceded by supplementary soil tests when the conditions of test pile installation fail to comply with the design assumptions or when the pile length exceeds the depth of the previously investigated soil, making documentation of load capacity tests (with an additional correction of the piling design), the actual piling (ongoing analysis of pile driving logs and, if necessary, testing the piles’ integrity), drawing up the as-built documentation. Unfortunately, the design is corrected after the load test have been conducted only if the piles fail to show the designed bearing capacity. The designer is then obliged to revise the design assumptions on the basis of tests results. If the test results account for the a greater bearing capacity than necessary and it would be recommendable to limit the extent of the planned (i.e. set out in the contract) piling works, usually neither the contractor nor the designer, nor even the Construction Site Supervisor, acting for the benefit of the Investor, are willing to take on the responsibility for reducing the scope of the piling works. The necessity of conducting additional control tests before and during the implementation of the construction project is often treated by the investors as an attempt at extorting extra financial resources or at delaying the project implementation. The designer, however, has no other possibility (and often - he/she does not have required qualifications) to verify the obtained test results.
NASA Astrophysics Data System (ADS)
Trofymow, J. A.; Coops, N.; Hayhurst, D.
2012-12-01
Following forest harvest, residues left on site and roadsides are often disposed of to reduce fire risk and free planting space. In coastal British Columbia burn piles are the main method of disposal, particularly for accumulations from log processing. Quantification of residue wood in piles is required for: smoke emission estimates, C budget calculations, billable waste assessment, harvest efficiency monitoring, and determination of bioenergy potentials. A second-growth Douglas-fir dominated (DF1949) site on eastern Vancouver Island and subject of C flux and budget studies since 1998, was clearcut in winter 2011, residues piled in spring and burned in fall. Prior to harvest, the site was divided into 4 blocks to account for harvest plans and ecosite conditions. Total harvested wood volume was scaled for each block. Residue pile wood volume was determined by a standard Waste and Residue Survey (WRS) using field estimates of pile base area and plot density (wood volume / 0.005 ha plot) on 2 piles per block, by a smoke emissions geometric method with pile volumes estimated as ellipsoidal paraboloids and packing ratios (wood volume / pile volume) for 2 piles per block, as well as by five other GIS methods using pile volumes and areas from LiDAR and orthophotography flown August 2011, a LiDAR derived digital elevation model (DEM) from 2008, and total scaled wood volumes of 8 sample piles disassembled November 2011. A weak but significant negative relationship was found between pile packing ratio and pile volume. Block level avoidable+unavoidable residue pile wood volumes from the WRS method (20.0 m3 ha-1 SE 2.8) were 30%-50% of the geometric (69.0 m3 ha-1 SE 18.0) or five GIS/LiDAR (48.0 to 65.7 m3 ha-1 ) methods. Block volumes using the 2008 LiDAR DEM (unshifted 48.0 m3 ha-1 SE 3.9, shifted 53.6 m3 ha-1 SE 4.2) to account for pre-existing humps or hollows beneath piles were not different from those using the 2011 LiDAR DEM (50.3 m3 ha-1 SE 4.0). The block volume ratio (total residue pile / harvest scale, wood volumes x 100) for the WRS method (3.3% SE 0.45) was lower than for LiDAR 2011 method (8.1% SE 0.31). Using wood densities from in situ samples and LiDAR 2011 method wood volumes, total residue pile wood biomass in the blocks was 21.5 t dry mass ha-1 (SE 1.9). Post-burn charred residues were ~1.5 t dry mass ha-1 resulting in C emission estimates of 10 t C ha-1 (SE 0.91), assuming 50% C, and equivalent to 2 - 3 years of pre-harvest stand C uptake (NEP 4.8 t C ha-1 y-1 SE 0.58). Results suggest the WRS method may underestimate residue pile wood volumes, while the geometric method may overestimate depending on packing ratio used. While remote sensing methods reduce uncertainty in estimating volumes or areas of all piles in a block, quantification of packing ratios remains a significant source of uncertainty in determining block level residue pile wood volumes. Additional studies are needed for other forest and harvest types to determine the wider applicability of these findings.
NASA Astrophysics Data System (ADS)
Nihei, Tatsuya; Nishioka, Hidetoshi; Kawamura, Chikara; Nishimura, Masahiro; Edamatsu, Masayuki; Koda, Masayuki
In order to introduce the performance based design of pile foundation, vertical stiffness of pile is one of the important design factors. Although it had been es timated the vertical stiffness of pile had the displacement-level dependency, it had been not clarified. We compared the vertical stiffness of pile measured by two loading conditions at pile foundation of the railway viaduct. Firstly, we measured the vertical stiffness at static loading test under construction of the viaduct. Secondly, we measured the vertical stiffness at the time of train passing. So, we recognized that the extrapolation of the displacement level dependency in static loading test could evaluate the vertical stiffness of pile during train passing.
Measurement of stress waves in EDC piles.
DOT National Transportation Integrated Search
2008-12-30
"This project focused on instrumentation analysis of one Smart Structures Incorporated, EDC pile. In general, the EDC pile is a pre-stressed 18" x 18" concrete pile that has been outfitted with embedded strain gages and accelerometers at six location...
Static pile load tests on driven piles in Intermediate-Geo Materials : research brief.
DOT National Transportation Integrated Search
2017-02-01
Research Objectives: : Investigate the use of modified standard penetration tests (MSPT) : Compare field results with predictions made by the WisDOT driving formula, PDA and CAPWAP : Improve prediction of pile lengths and pile capacities ...
Prediction of pile set-up for Ohio soils.
DOT National Transportation Integrated Search
2011-02-01
ODOT typically uses small diameter driven pipe piles for bridge foundations. When a pile is driven into the subsurface, it disturbs and displaces the soil. As the soil surrounding the pile recovers from the installation disturbance, a time dependant ...
Design phase identification of high pile rebound soils : final report
DOT National Transportation Integrated Search
2010-12-15
An engineering problem has occurred when installing displacement piles in certain soils. During driving, piles are rebounding excessively during each hammer blow, causing delay and as a result may not achieve the required design capacities. Piles dri...
37. DETAIL VIEW OF PILINGS AT BENT 8, LOOKING SOUTHWEST, ...
37. DETAIL VIEW OF PILINGS AT BENT 8, LOOKING SOUTHWEST, SHOWING PILING WITH CONCRETE COLLAR (LEFT) AND GUNITE-ENCASED PILING (RIGHT) - Huntington Beach Municipal Pier, Pacific Coast Highway at Main Street, Huntington Beach, Orange County, CA
Pile Driving Analysis for Pile Design and Quality Assurance
DOT National Transportation Integrated Search
2017-08-01
Driven piles are commonly used in foundation engineering. The most accurate measurement of pile capacity is achieved from measurements made during static load tests. Static load tests, however, may be too expensive for certain projects. In these case...
48 CFR 452.236-79 - Opted Timber Sale Road Requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Opted Timber Sale Road... Opted Timber Sale Road Requirements. As prescribed in 436.579, insert the following clause: Opted Timber Sale Road Requirements (NOV 1996) This contract is for the construction of timber sale road(s) which a...
Forest Productivity and Timber Supply Modeling in the South
Frederick Cubbage; Jacek Siry; Robert Abt; David N. Wear; Steverson Moffat
1998-01-01
The South can increase forest productivity on industrial and nonindustrial private forest (NIPF) lands. As timber markets have improved and timber prices have increased, returns from intensive management are more profitable. The interaction of timber markets, inventory, and prices are analyzed in new southern timber supply models sponsored by the Southern Forest...
36 CFR 223.32 - Timber sale operating plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 36 Parks, Forests, and Public Property 2 2010-07-01 2010-07-01 false Timber sale operating plan... SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER Timber Sale Contracts Contract Conditions and Provisions § 223.32 Timber sale operating plan. Sale contracts with a term of 2 years or more shall provide...
Improving design phase evaluations for high pile rebound sites [summary].
DOT National Transportation Integrated Search
2016-05-01
In Florida, many structures are built on driven piles. Though it seems straightforward, pile : driving involves complex interactions between the pile, the hammer, the soil, and driving : procedures. Soils can even rebound, or push back, after each ha...
Evaluation/modification of IDOT foundation piling design and construction policy.
DOT National Transportation Integrated Search
2009-03-01
The Illinois Department of Transportation (IDOT) estimates pile lengths based on a static analysis method; : however, the final length of the pile is determined with a dynamic formula based on the pile driving resistance : exhibited in the field. Bec...
NASA Astrophysics Data System (ADS)
Lugovtsova, Y. D.; Soldatov, A. I.
2016-01-01
Three different methods for pile integrity testing are proposed to compare on a cylindrical homogeneous polyamide specimen. The methods are low strain pile integrity testing, multichannel pile integrity testing and testing with a shaker system. Since the low strain pile integrity testing is well-established and standardized method, the results from it are used as a reference for other two methods.
40 CFR 429.74 - New source performance standards (NSPS).
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 31 2013-07-01 2013-07-01 false New source performance standards (NSPS). 429.74 Section 429.74 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS (CONTINUED) TIMBER PRODUCTS PROCESSING POINT SOURCE CATEGORY Wood Preserving-Water...
40 CFR 429.75 - Pretreatment standards for existing sources (PSES).
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 31 2013-07-01 2013-07-01 false Pretreatment standards for existing sources (PSES). 429.75 Section 429.75 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS (CONTINUED) TIMBER PRODUCTS PROCESSING POINT SOURCE CATEGORY Wood...
40 CFR 429.75 - Pretreatment standards for existing sources (PSES).
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 31 2012-07-01 2012-07-01 false Pretreatment standards for existing sources (PSES). 429.75 Section 429.75 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS (CONTINUED) TIMBER PRODUCTS PROCESSING POINT SOURCE CATEGORY Wood...
40 CFR 429.85 - Pretreatment standards for existing sources (PSES).
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 30 2014-07-01 2014-07-01 false Pretreatment standards for existing sources (PSES). 429.85 Section 429.85 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS (CONTINUED) TIMBER PRODUCTS PROCESSING POINT SOURCE CATEGORY Wood...
40 CFR 429.76 - Pretreatment standards for new sources (PSNS).
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 31 2013-07-01 2013-07-01 false Pretreatment standards for new sources (PSNS). 429.76 Section 429.76 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS (CONTINUED) TIMBER PRODUCTS PROCESSING POINT SOURCE CATEGORY Wood...
40 CFR 429.76 - Pretreatment standards for new sources (PSNS).
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 30 2014-07-01 2014-07-01 false Pretreatment standards for new sources (PSNS). 429.76 Section 429.76 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS (CONTINUED) TIMBER PRODUCTS PROCESSING POINT SOURCE CATEGORY Wood...
40 CFR 429.96 - Pretreatment standards for new sources (PSNS).
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 30 2014-07-01 2014-07-01 false Pretreatment standards for new sources (PSNS). 429.96 Section 429.96 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS (CONTINUED) TIMBER PRODUCTS PROCESSING POINT SOURCE CATEGORY Wood...
40 CFR 429.85 - Pretreatment standards for existing sources (PSES).
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 31 2013-07-01 2013-07-01 false Pretreatment standards for existing sources (PSES). 429.85 Section 429.85 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS (CONTINUED) TIMBER PRODUCTS PROCESSING POINT SOURCE CATEGORY Wood...
40 CFR 429.84 - New source performance standards (NSPS).
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 31 2013-07-01 2013-07-01 false New source performance standards (NSPS). 429.84 Section 429.84 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS (CONTINUED) TIMBER PRODUCTS PROCESSING POINT SOURCE CATEGORY Wood Preserving Steam...
40 CFR 429.86 - Pretreatment standards for new sources (PSNS).
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 31 2013-07-01 2013-07-01 false Pretreatment standards for new sources (PSNS). 429.86 Section 429.86 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS (CONTINUED) TIMBER PRODUCTS PROCESSING POINT SOURCE CATEGORY Wood...
40 CFR 429.75 - Pretreatment standards for existing sources (PSES).
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 30 2014-07-01 2014-07-01 false Pretreatment standards for existing sources (PSES). 429.75 Section 429.75 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS (CONTINUED) TIMBER PRODUCTS PROCESSING POINT SOURCE CATEGORY Wood...
40 CFR 429.74 - New source performance standards (NSPS).
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 30 2014-07-01 2014-07-01 false New source performance standards (NSPS). 429.74 Section 429.74 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS (CONTINUED) TIMBER PRODUCTS PROCESSING POINT SOURCE CATEGORY Wood Preserving-Water...
40 CFR 429.86 - Pretreatment standards for new sources (PSNS).
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 30 2014-07-01 2014-07-01 false Pretreatment standards for new sources (PSNS). 429.86 Section 429.86 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS (CONTINUED) TIMBER PRODUCTS PROCESSING POINT SOURCE CATEGORY Wood...
40 CFR 429.94 - New source performance standards (NSPS).
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 30 2014-07-01 2014-07-01 false New source performance standards (NSPS). 429.94 Section 429.94 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS (CONTINUED) TIMBER PRODUCTS PROCESSING POINT SOURCE CATEGORY Wood Preserving-Boulton...
40 CFR 429.84 - New source performance standards (NSPS).
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 30 2014-07-01 2014-07-01 false New source performance standards (NSPS). 429.84 Section 429.84 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS (CONTINUED) TIMBER PRODUCTS PROCESSING POINT SOURCE CATEGORY Wood Preserving Steam...
40 CFR 429.74 - New source performance standards (NSPS).
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 31 2012-07-01 2012-07-01 false New source performance standards (NSPS). 429.74 Section 429.74 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS (CONTINUED) TIMBER PRODUCTS PROCESSING POINT SOURCE CATEGORY Wood Preserving-Water...
40 CFR 429.95 - Pretreatment standards for existing sources (PSES).
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 30 2014-07-01 2014-07-01 false Pretreatment standards for existing sources (PSES). 429.95 Section 429.95 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS (CONTINUED) TIMBER PRODUCTS PROCESSING POINT SOURCE CATEGORY Wood...
36 CFR 223.164 - Penalty for falsification.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 36 Parks, Forests, and Public Property 2 2013-07-01 2013-07-01 false Penalty for falsification. 223.164 Section 223.164 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL...
Code of Federal Regulations, 2013 CFR
2013-07-01
... 36 Parks, Forests, and Public Property 2 2013-07-01 2013-07-01 false Scope. 223.130 Section 223.130 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS Suspension and...
Code of Federal Regulations, 2011 CFR
2011-07-01
... 36 Parks, Forests, and Public Property 2 2011-07-01 2011-07-01 false Scope. 223.130 Section 223.130 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS Suspension and...
36 CFR 223.143 - Procedures for suspension.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 36 Parks, Forests, and Public Property 2 2013-07-01 2013-07-01 false Procedures for suspension. 223.143 Section 223.143 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL...
36 CFR 223.143 - Procedures for suspension.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 36 Parks, Forests, and Public Property 2 2011-07-01 2011-07-01 false Procedures for suspension. 223.143 Section 223.143 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL...
36 CFR 223.82 - Contents of advertisement.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 36 Parks, Forests, and Public Property 2 2012-07-01 2012-07-01 false Contents of advertisement. 223.82 Section 223.82 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL...
36 CFR 223.112 - Modification of contracts.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 36 Parks, Forests, and Public Property 2 2013-07-01 2013-07-01 false Modification of contracts. 223.112 Section 223.112 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL...
36 CFR 223.164 - Penalty for falsification.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 36 Parks, Forests, and Public Property 2 2012-07-01 2012-07-01 false Penalty for falsification. 223.164 Section 223.164 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL...
36 CFR 223.228 - Contents of advertisement.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 36 Parks, Forests, and Public Property 2 2014-07-01 2014-07-01 false Contents of advertisement. 223.228 Section 223.228 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL...
36 CFR 223.223 - Advance payment.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 36 Parks, Forests, and Public Property 2 2014-07-01 2014-07-01 false Advance payment. 223.223 Section 223.223 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS Special...
36 CFR 223.143 - Procedures for suspension.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 36 Parks, Forests, and Public Property 2 2014-07-01 2014-07-01 false Procedures for suspension. 223.143 Section 223.143 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL...
Code of Federal Regulations, 2013 CFR
2013-07-01
... 36 Parks, Forests, and Public Property 2 2013-07-01 2013-07-01 false Policy. 223.132 Section 223.132 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS Suspension and...
36 CFR 223.227 - Sale advertisement.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 36 Parks, Forests, and Public Property 2 2014-07-01 2014-07-01 false Sale advertisement. 223.227 Section 223.227 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS Special...
Code of Federal Regulations, 2012 CFR
2012-07-01
... 36 Parks, Forests, and Public Property 2 2012-07-01 2012-07-01 false Scope. 223.130 Section 223.130 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS Suspension and...
36 CFR 223.82 - Contents of advertisement.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 36 Parks, Forests, and Public Property 2 2014-07-01 2014-07-01 false Contents of advertisement. 223.82 Section 223.82 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL...
36 CFR 223.112 - Modification of contracts.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 36 Parks, Forests, and Public Property 2 2014-07-01 2014-07-01 false Modification of contracts. 223.112 Section 223.112 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL...
36 CFR 223.112 - Modification of contracts.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 36 Parks, Forests, and Public Property 2 2012-07-01 2012-07-01 false Modification of contracts. 223.112 Section 223.112 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL...
36 CFR 223.82 - Contents of advertisement.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 36 Parks, Forests, and Public Property 2 2013-07-01 2013-07-01 false Contents of advertisement. 223.82 Section 223.82 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL...
36 CFR 223.164 - Penalty for falsification.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 36 Parks, Forests, and Public Property 2 2014-07-01 2014-07-01 false Penalty for falsification. 223.164 Section 223.164 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL...
36 CFR 223.143 - Procedures for suspension.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 36 Parks, Forests, and Public Property 2 2012-07-01 2012-07-01 false Procedures for suspension. 223.143 Section 223.143 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL...
36 CFR 223.112 - Modification of contracts.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 36 Parks, Forests, and Public Property 2 2011-07-01 2011-07-01 false Modification of contracts. 223.112 Section 223.112 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL...
Code of Federal Regulations, 2014 CFR
2014-07-01
... 36 Parks, Forests, and Public Property 2 2014-07-01 2014-07-01 false Scope. 223.130 Section 223.130 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS Suspension and...
Code of Federal Regulations, 2014 CFR
2014-07-01
... 36 Parks, Forests, and Public Property 2 2014-07-01 2014-07-01 false Term. 223.225 Section 223.225 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS Special Forest...
Code of Federal Regulations, 2014 CFR
2014-07-01
... 36 Parks, Forests, and Public Property 2 2014-07-01 2014-07-01 false Policy. 223.132 Section 223.132 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS Suspension and...
36 CFR 223.276 - Applicability.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 36 Parks, Forests, and Public Property 2 2010-07-01 2010-07-01 false Applicability. 223.276 Section 223.276 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER Forest Botanical Products § 223.276 Applicability. This subpart...
36 CFR 223.220 - Quantity determination.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 36 Parks, Forests, and Public Property 2 2010-07-01 2010-07-01 false Quantity determination. 223.220 Section 223.220 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER Special Forest Products § 223.220 Quantity determination...
36 CFR 223.215 - Applicability.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 36 Parks, Forests, and Public Property 2 2010-07-01 2010-07-01 false Applicability. 223.215 Section 223.215 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER Special Forest Products § 223.215 Applicability. The regulations...
40 CFR 429.86 - Pretreatment standards for new sources (PSNS).
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 29 2010-07-01 2010-07-01 false Pretreatment standards for new sources (PSNS). 429.86 Section 429.86 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS TIMBER PRODUCTS PROCESSING POINT SOURCE CATEGORY Wood Preserving Steam...
40 CFR 429.74 - New source performance standards (NSPS).
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 30 2011-07-01 2011-07-01 false New source performance standards (NSPS). 429.74 Section 429.74 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS TIMBER PRODUCTS PROCESSING POINT SOURCE CATEGORY Wood Preserving-Water Borne or...
40 CFR 429.95 - Pretreatment standards for existing sources (PSES).
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 30 2011-07-01 2011-07-01 false Pretreatment standards for existing sources (PSES). 429.95 Section 429.95 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS TIMBER PRODUCTS PROCESSING POINT SOURCE CATEGORY Wood Preserving-Boulton...
40 CFR 429.94 - New source performance standards (NSPS).
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 30 2011-07-01 2011-07-01 false New source performance standards (NSPS). 429.94 Section 429.94 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS TIMBER PRODUCTS PROCESSING POINT SOURCE CATEGORY Wood Preserving-Boulton Subcategory...
40 CFR 429.86 - Pretreatment standards for new sources (PSNS).
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 30 2011-07-01 2011-07-01 false Pretreatment standards for new sources (PSNS). 429.86 Section 429.86 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS TIMBER PRODUCTS PROCESSING POINT SOURCE CATEGORY Wood Preserving Steam...
40 CFR 429.76 - Pretreatment standards for new sources (PSNS).
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 30 2011-07-01 2011-07-01 false Pretreatment standards for new sources (PSNS). 429.76 Section 429.76 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS TIMBER PRODUCTS PROCESSING POINT SOURCE CATEGORY Wood Preserving-Water...
40 CFR 429.96 - Pretreatment standards for new sources (PSNS).
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 29 2010-07-01 2010-07-01 false Pretreatment standards for new sources (PSNS). 429.96 Section 429.96 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS TIMBER PRODUCTS PROCESSING POINT SOURCE CATEGORY Wood Preserving-Boulton...
40 CFR 429.95 - Pretreatment standards for existing sources (PSES).
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 29 2010-07-01 2010-07-01 false Pretreatment standards for existing sources (PSES). 429.95 Section 429.95 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS TIMBER PRODUCTS PROCESSING POINT SOURCE CATEGORY Wood Preserving-Boulton...
40 CFR 429.75 - Pretreatment standards for existing sources (PSES).
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 29 2010-07-01 2010-07-01 false Pretreatment standards for existing sources (PSES). 429.75 Section 429.75 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS TIMBER PRODUCTS PROCESSING POINT SOURCE CATEGORY Wood Preserving-Water...
40 CFR 429.75 - Pretreatment standards for existing sources (PSES).
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 30 2011-07-01 2011-07-01 false Pretreatment standards for existing sources (PSES). 429.75 Section 429.75 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS TIMBER PRODUCTS PROCESSING POINT SOURCE CATEGORY Wood Preserving-Water...
40 CFR 429.74 - New source performance standards (NSPS).
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 29 2010-07-01 2010-07-01 false New source performance standards (NSPS). 429.74 Section 429.74 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS TIMBER PRODUCTS PROCESSING POINT SOURCE CATEGORY Wood Preserving-Water Borne or...
40 CFR 429.96 - Pretreatment standards for new sources (PSNS).
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 30 2011-07-01 2011-07-01 false Pretreatment standards for new sources (PSNS). 429.96 Section 429.96 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS TIMBER PRODUCTS PROCESSING POINT SOURCE CATEGORY Wood Preserving-Boulton...
40 CFR 429.85 - Pretreatment standards for existing sources (PSES).
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 29 2010-07-01 2010-07-01 false Pretreatment standards for existing sources (PSES). 429.85 Section 429.85 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS TIMBER PRODUCTS PROCESSING POINT SOURCE CATEGORY Wood Preserving Steam...
40 CFR 429.85 - Pretreatment standards for existing sources (PSES).
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 30 2011-07-01 2011-07-01 false Pretreatment standards for existing sources (PSES). 429.85 Section 429.85 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS TIMBER PRODUCTS PROCESSING POINT SOURCE CATEGORY Wood Preserving Steam...
40 CFR 429.76 - Pretreatment standards for new sources (PSNS).
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 29 2010-07-01 2010-07-01 false Pretreatment standards for new sources (PSNS). 429.76 Section 429.76 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS TIMBER PRODUCTS PROCESSING POINT SOURCE CATEGORY Wood Preserving-Water...
40 CFR 429.84 - New source performance standards (NSPS).
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 29 2010-07-01 2010-07-01 false New source performance standards (NSPS). 429.84 Section 429.84 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS TIMBER PRODUCTS PROCESSING POINT SOURCE CATEGORY Wood Preserving Steam Subcategory...
40 CFR 429.94 - New source performance standards (NSPS).
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 29 2010-07-01 2010-07-01 false New source performance standards (NSPS). 429.94 Section 429.94 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS TIMBER PRODUCTS PROCESSING POINT SOURCE CATEGORY Wood Preserving-Boulton Subcategory...
40 CFR 429.84 - New source performance standards (NSPS).
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 30 2011-07-01 2011-07-01 false New source performance standards (NSPS). 429.84 Section 429.84 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS TIMBER PRODUCTS PROCESSING POINT SOURCE CATEGORY Wood Preserving Steam Subcategory...
NASA Astrophysics Data System (ADS)
Maizir, H.; Suryanita, R.
2018-01-01
A few decades, many methods have been developed to predict and evaluate the bearing capacity of driven piles. The problem of the predicting and assessing the bearing capacity of the pile is very complicated and not yet established, different soil testing and evaluation produce a widely different solution. However, the most important thing is to determine methods used to predict and evaluate the bearing capacity of the pile to the required degree of accuracy and consistency value. Accurate prediction and evaluation of axial bearing capacity depend on some variables, such as the type of soil, diameter, and length of pile, etc. The aims of the study of Artificial Neural Networks (ANNs) are utilized to obtain more accurate and consistent axial bearing capacity of a driven pile. ANNs can be described as mapping an input to the target output data. The method using the ANN model developed to predict and evaluate the axial bearing capacity of the pile based on the pile driving analyzer (PDA) test data for more than 200 selected data. The results of the predictions obtained by the ANN model and the PDA test were then compared. This research as the neural network models give a right prediction and evaluation of the axial bearing capacity of piles using neural networks.
Damage Identification of Piles Based on Vibration Characteristics
Zhang, Xiaozhong; Yao, Wenjuan; Chen, Bo; Liu, Dewen
2014-01-01
A method of damage identification of piles was established by using vibration characteristics. The approach focused on the application of the element strain energy and sensitive modals. A damage identification equation of piles was deduced using the structural vibration equation. The equation contained three major factors: change rate of element modal strain energy, damage factor of pile, and sensitivity factor of modal damage. The sensitive modals of damage identification were selected by using sensitivity factor of modal damage firstly. Subsequently, the indexes for early-warning of pile damage were established by applying the change rate of strain energy. Then the technology of computational analysis of wavelet transform was used to damage identification for pile. The identification of small damage of pile was completely achieved, including the location of damage and the extent of damage. In the process of identifying the extent of damage of pile, the equation of damage identification was used in many times. Finally, a stadium project was used as an example to demonstrate the effectiveness of the proposed method of damage identification for piles. The correctness and practicability of the proposed method were verified by comparing the results of damage identification with that of low strain test. The research provided a new way for damage identification of piles. PMID:25506062
NASA Astrophysics Data System (ADS)
Trofymow, J. A.; Gougeon, F.; Kelley, J. W.
2017-12-01
Forest carbon (C) models require knowledge on C transfers due to intense disturbances such as fire, harvest, and slash burning. In such events, live trees die and C transferred to detritus or exported as round wood. With burning, live and detrital C is lost as emissions. Burning can be incomplete, leaving wood, charred and scattered or in unburnt rings and piles. For harvests, all round wood volume is routinely measured, while dispersed and piled residue volumes are typically assessed in field surveys, scaled to a block. Recently, geospatial methods have been used to determine, for an entire block, piled residues using LiDAR or image point clouds (PC) and dispersed residues by analysis of high-resolution imagery. Second-growth Douglas-fir forests on eastern Vancouver Island were examined, 4 blocks at Oyster River (OR) and 2 at Northwest Bay (NB). OR blocks were cut winter 2011, piled spring 2011, field survey, aerial RGB imagery and LiDAR PC acquired fall 2011, piles burned, burn residues surveyed, and post-burn aerial RGB imagery acquired 2012. NB blocks were cut fall 2014, piled spring 2015, field survey, UAV RGB imagery and image PC acquired summer 2015, piles burned and burn residues surveyed spring 2016, and post-burn UAV RGB imagery and PC acquired fall 2016. Volume to biomass conversion used survey species proportions and wood density. At OR, round wood was 261.7 SE 13.1, firewood 1.7 SE 0.3, and dispersed residue by survey, 13.8 SE 3.6 tonnes dry mass (t dm) ha-1. Piled residues were 8.2 SE 0.9 from pile surveys vs. 25.0 SE 5.9 t dm ha-1 from LiDAR PC bulk pile volumes and packing ratios. Post-burn, piles lost 5.8 SE 0.5 from survey of burn residues vs. 18.2 SE 4.7 t dm ha-1 from pile volume changes using 2011 LiDAR PC and 2012 imagery. The percentage of initial merchantable biomass exported as round & fire wood, remaining as dispersed & piled residue, and lost to burning was, respectively, 92.5%, 5.5% and 2% using only field methods vs. 87%, 7% and 6% from dispersed residues surveys and LIDAR PC pile volumes. At NB, preliminary analysis shows the post-burn difference in 2015 to 2016 UAV PC pile volumes, was similar to that using 2015 UAV PC pile volume and 2016 orthophoto pile area burned, suggesting the two geospatial methods are comparable. Comparisons will be made for transfers in all 6 blocks using only field survey or geospatial methods.
Interesting Developments in Testing Methods Applied to Foundation Piles
NASA Astrophysics Data System (ADS)
Sobala, Dariusz; Tkaczyński, Grzegorz
2017-10-01
Both: piling technologies and pile testing methods are a subject of current development. New technologies, providing larger diameters or using in-situ materials, are very demanding in terms of providing proper quality of execution of works. That concerns the material quality and continuity which define the integral strength of pile. On the other side we have the capacity of the ground around the pile and its ability to carry the loads transferred by shaft and pile base. Inhomogeneous nature of soils and a relatively small amount of tested piles imposes very good understanding of small amount of results. In some special cases the capacity test itself form an important cost in the piling contract. This work presents a brief description of selected testing methods and authors remarks based on cooperation with Universities constantly developing new ideas. Paper presents some experience based remarks on integrity testing by means of low energy impact (low strain) and introduces selected (Polish) developments in the field of closed-end pipe piles testing based on bi-directional loading, similar to Osterberg idea, but without sacrificial hydraulic jack. Such test is suitable especially when steel piles are used for temporary support in the rivers, where constructing of conventional testing appliance with anchor piles or kentledge meets technical problems. According to the author’s experience, such tests were not yet used on the building site but they bring a real potential especially, when the displacement control can be provided from the river bank using surveying techniques.
Pulse pile-up identification and reconstruction for liquid scintillator based neutron detectors
NASA Astrophysics Data System (ADS)
Luo, X. L.; Modamio, V.; Nyberg, J.; Valiente-Dobón, J. J.; Nishada, Q.; de Angelis, G.; Agramunt, J.; Egea, F. J.; Erduran, M. N.; Ertürk, S.; de France, G.; Gadea, A.; González, V.; Goasduff, A.; Hüyük, T.; Jaworski, G.; Moszyński, M.; Di Nitto, A.; Palacz, M.; Söderström, P.-A.; Sanchis, E.; Triossi, A.; Wadsworth, R.
2018-07-01
The issue of pulse pile-up is frequently encountered in nuclear experiments involving high counting rates, which will distort the pulse shapes and the energy spectra. A digital method of off-line processing of pile-up pulses is presented. The pile-up pulses were firstly identified by detecting the downward-going zero-crossings in the first-order derivative of the original signal, and then the constituent pulses were reconstructed based on comparing the pile-up pulse with four models that are generated by combining pairs of neutron and γ standard pulses together with a controllable time interval. The accuracy of this method in resolving the pile-up events was investigated as a function of the time interval between two pulses constituting a pile-up event. The obtained results show that the method is capable of disentangling two pulses with a time interval among them down to 20 ns, as well as classifying them as neutrons or γ rays. Furthermore, the error of reconstructing pile-up pulses could be kept below 6% when successive peaks were separated by more than 50 ns. By applying the method in a high counting rate of pile-up events measurement of the NEutron Detector Array (NEDA), it was empirically found that this method can reconstruct the pile-up pulses and perform neutron- γ discrimination quite accurately. It can also significantly correct the distorted pulse height spectrum due to pile-up events.
Prediction of pile set-up for Ohio soils : executive summary report.
DOT National Transportation Integrated Search
2011-02-01
ODOT typically uses small diameter driven pipe piles for bridge foundations. When a pile is driven into the subsurface, it disturbs and displaces the soil. As the soil surrounding the pile recovers from the installation disturbance, a time dependant ...
33 CFR 110.55 - Connecticut River, Conn.
Code of Federal Regulations, 2013 CFR
2013-07-01
... Section 110.55 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY ANCHORAGES ANCHORAGE REGULATIONS Special Anchorage Areas § 110.55 Connecticut River, Conn. (a) West of Calves Island at... mooring piles or stakes are prohibited. (d) Upper Bay—(1) Anchorage No. 20-A. (i) All waters bound by the...
33 CFR 110.55 - Connecticut River, Conn.
Code of Federal Regulations, 2012 CFR
2012-07-01
... Section 110.55 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY ANCHORAGES ANCHORAGE REGULATIONS Special Anchorage Areas § 110.55 Connecticut River, Conn. (a) West of Calves Island at... mooring piles or stakes are prohibited. (d) Upper Bay—(1) Anchorage No. 20-A. (i) All waters bound by the...
33 CFR 110.55 - Connecticut River, Conn.
Code of Federal Regulations, 2014 CFR
2014-07-01
... Section 110.55 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY ANCHORAGES ANCHORAGE REGULATIONS Special Anchorage Areas § 110.55 Connecticut River, Conn. (a) West of Calves Island at... mooring piles or stakes are prohibited. (d) Upper Bay—(1) Anchorage No. 20-A. (i) All waters bound by the...
7 CFR 3201.64 - Compost activators and accelerators.
Code of Federal Regulations, 2014 CFR
2014-01-01
... PROCUREMENT Designated Items § 3201.64 Compost activators and accelerators. (a) Definition. Products in liquid or powder form designed to be applied to compost piles to aid in speeding up the composting process... 7 Agriculture 15 2014-01-01 2014-01-01 false Compost activators and accelerators. 3201.64 Section...