Sample records for time time required

  1. 75 FR 17919 - Submission for OMB Review; American Recovery and Reinvestment Act-One-time Reporting Requirements...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-08

    ... Recovery and Reinvestment Act--One-time Reporting Requirements for Prime Contractors AGENCY: Department of... requirement concerning the American Recovery and Reinvestment Act--One-time Reporting Requirements for Prime... Act--One-time Reporting Requirements for Prime Contractors, in all correspondence. FOR FURTHER...

  2. 75 FR 18835 - Submission for OMB Review; American Recovery and Reinvestment Act-One-Time Reporting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-13

    ... Recovery and Reinvestment Act--One-Time Reporting, Compensation Requirements AGENCY: Department of Defense... requirement concerning the one-time reporting, compensation requirements. A request for public comments was.... 9000-0168, American Recovery and Reinvestment Act--One-time Reporting, Compensation Requirements, in...

  3. Department of Defense Precise Time and Time Interval program improvement plan

    NASA Technical Reports Server (NTRS)

    Bowser, J. R.

    1981-01-01

    The United States Naval Observatory is responsible for ensuring uniformity in precise time and time interval operations including measurements, the establishment of overall DOD requirements for time and time interval, and the accomplishment of objectives requiring precise time and time interval with minimum cost. An overview of the objectives, the approach to the problem, the schedule, and a status report, including significant findings relative to organizational relationships, current directives, principal PTTI users, and future requirements as currently identified by the users are presented.

  4. 7 CFR 56.46 - On a fee basis.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... required to perform the grading, waiting time, travel time, and any clerical costs involved in issuing a... required to perform the audit, waiting time, travel time, travel expenses and any clerical costs involved... services will be based on the time required to perform the services. The hourly charge shall be $74.08...

  5. 7 CFR 56.46 - On a fee basis.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... required to perform the grading, waiting time, travel time, and any clerical costs involved in issuing a... required to perform the audit, waiting time, travel time, travel expenses and any clerical costs involved... services will be based on the time required to perform the services. The hourly charge shall be $74.08...

  6. 7 CFR 56.46 - On a fee basis.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... required to perform the grading, waiting time, travel time, and any clerical costs involved in issuing a... required to perform the audit, waiting time, travel time, travel expenses and any clerical costs involved... services will be based on the time required to perform the services. The hourly charge shall be $74.08...

  7. 7 CFR 56.46 - On a fee basis.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... required to perform the grading, waiting time, travel time, and any clerical costs involved in issuing a... required to perform the audit, waiting time, travel time, travel expenses and any clerical costs involved... services will be based on the time required to perform the services. The hourly charge shall be $74.08...

  8. 7 CFR 56.46 - On a fee basis.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... required to perform the grading, waiting time, travel time, and any clerical costs involved in issuing a... required to perform the audit, waiting time, travel time, travel expenses and any clerical costs involved... services will be based on the time required to perform the services. The hourly charge shall be $74.08...

  9. 30 CFR 48.3 - Training plans; time of submission; where filed; information required; time for approval; method...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... will be given for each course. (5) A description of the teaching methods and the course materials which...; information required; time for approval; method for disapproval; commencement of training; approval of....3 Training plans; time of submission; where filed; information required; time for approval; method...

  10. 30 CFR 48.3 - Training plans; time of submission; where filed; information required; time for approval; method...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... will be given for each course. (5) A description of the teaching methods and the course materials which...; information required; time for approval; method for disapproval; commencement of training; approval of....3 Training plans; time of submission; where filed; information required; time for approval; method...

  11. 30 CFR 48.3 - Training plans; time of submission; where filed; information required; time for approval; method...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... will be given for each course. (5) A description of the teaching methods and the course materials which...; information required; time for approval; method for disapproval; commencement of training; approval of....3 Training plans; time of submission; where filed; information required; time for approval; method...

  12. 30 CFR 48.3 - Training plans; time of submission; where filed; information required; time for approval; method...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... will be given for each course. (5) A description of the teaching methods and the course materials which...; information required; time for approval; method for disapproval; commencement of training; approval of....3 Training plans; time of submission; where filed; information required; time for approval; method...

  13. 30 CFR 48.3 - Training plans; time of submission; where filed; information required; time for approval; method...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... will be given for each course. (5) A description of the teaching methods and the course materials which...; information required; time for approval; method for disapproval; commencement of training; approval of....3 Training plans; time of submission; where filed; information required; time for approval; method...

  14. 7 CFR 1.113 - Times, places, and requirements for identification of individuals making requests.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 1 2010-01-01 2010-01-01 false Times, places, and requirements for identification of... ADMINISTRATIVE REGULATIONS Privacy Act Regulations § 1.113 Times, places, and requirements for identification of... granted that request, the requester shall present himself or herself at the time and place specified in...

  15. 30 CFR 48.23 - Training plans; time of submission; where filed; information required; time for approval; method...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...; information required; time for approval; method for disapproval; commencement of training; approval of... filed; information required; time for approval; method for disapproval; commencement of training... miners as a normal method of operation by the operator. The operator to be so excepted shall maintain an...

  16. 30 CFR 48.23 - Training plans; time of submission; where filed; information required; time for approval; method...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...; information required; time for approval; method for disapproval; commencement of training; approval of... filed; information required; time for approval; method for disapproval; commencement of training... miners as a normal method of operation by the operator. The operator to be so excepted shall maintain an...

  17. 30 CFR 48.23 - Training plans; time of submission; where filed; information required; time for approval; method...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...; information required; time for approval; method for disapproval; commencement of training; approval of... filed; information required; time for approval; method for disapproval; commencement of training... miners as a normal method of operation by the operator. The operator to be so excepted shall maintain an...

  18. 30 CFR 48.23 - Training plans; time of submission; where filed; information required; time for approval; method...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...; information required; time for approval; method for disapproval; commencement of training; approval of... filed; information required; time for approval; method for disapproval; commencement of training... miners as a normal method of operation by the operator. The operator to be so excepted shall maintain an...

  19. 30 CFR 48.23 - Training plans; time of submission; where filed; information required; time for approval; method...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...; information required; time for approval; method for disapproval; commencement of training; approval of... filed; information required; time for approval; method for disapproval; commencement of training... miners as a normal method of operation by the operator. The operator to be so excepted shall maintain an...

  20. 75 FR 22805 - Submission for OMB Review; American Recovery and Reinvestment Act-One-Time Reporting Requirements...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-30

    ... Recovery and Reinvestment Act--One-Time Reporting Requirements for Prime Contractors AGENCIES: Department... Recovery and Reinvestment Act--One-time Reporting Requirements for Prime Contractors published in the...

  1. Role of time in symbiotic systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Agrawala, A.K.

    1996-12-31

    All systems have a dynamics which reflects the changes in the system in time and, therefore, have to maintain a notion of time, either explicitly or implicitly. Traditionally, the notion of time in constructed systems has been implicitly specified at design time through rigid structures such as sampled data systems which operate with a fixed time tick, feedback systems which are designed reflecting a fixed time scale for the dynamics of the system as well as the controller responses, etc. In biological systems, the sense of time is a key element but it is not rigidly structured, even though allmore » such systems have a clear notion of time. We define the notion of time in systems in terms of temporal locality, time scale and time horizon. Temporal locality gives the notion of the accuracy with which the system knows about the current time. Time scale reflects the scale indicating the smallest and the largest granularity considered. It also reflects the reaction time. The time horizon indicates the time beyond which the system considers to be distant future and may not take it into account in its actions. Note that the temporal locality, time scale and the time horizon may be different for different types of actions of a system, thereby permitting the system to use multiple notions of time concurrently. In multi agent systems each subsystem may have its own notion of time but when intentions take place a coordination is necessary. Such coordination requires that the notions of time for different agents of the system be consistent. Clearly, the consistency requirement in this case does not mean exactly identical but implies that different agents can coordinate their actions which must take place in time. When the actions only require a determinate ordering the required coordination is much less severe than the case requiring actions to take place at the same time.« less

  2. 5 CFR 340.201 - Regulatory requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 340.201 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS OTHER THAN FULL-TIME CAREER EMPLOYMENT (PART-TIME, SEASONAL, ON-CALL, AND INTERMITTENT) Regulatory Requirements-Part-Time Employment § 340.201 Regulatory requirements. This subpart contains the regulations of the...

  3. Response Time Analysis and Test of Protection System Instrument Channels for APR1400 and OPR1000

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lee, Chang Jae; Han, Seung; Yun, Jae Hee

    2015-07-01

    Safety limits are required to maintain the integrity of physical barriers designed to prevent the uncontrolled release of radioactive materials in nuclear power plants. The safety analysis establishes two critical constraints that include an analytical limit in terms of a measured or calculated variable, and a specific time after the analytical limit is reached to begin protective action. Keeping with the nuclear regulations and industry standards, satisfying these two requirements will ensure that the safety limit will not be exceeded during the design basis event, either an anticipated operational occurrence or a postulated accident. Various studies on the setpoint determinationmore » methodology for the safety-related instrumentation have been actively performed to ensure that the requirement of the analytical limit is satisfied. In particular, the protection setpoint methodology for the advanced power reactor 1400 (APP1400) and the optimized power reactor 1000 (OPR1000) has been recently developed to cover both the design basis event and the beyond design basis event. The developed setpoint methodology has also been quantitatively validated using specific computer programs and setpoint calculations. However, the safety of nuclear power plants cannot be fully guaranteed by satisfying the requirement of the analytical limit. In spite of the response time verification requirements of nuclear regulations and industry standards, it is hard to find the studies on the systematically integrated methodology regarding the response time evaluation. In cases of APR1400 and OPR1000, the response time analysis for the plant protection system is partially included in the setpoint calculation and the response time test is separately performed via the specific plant procedure. The test technique has a drawback which is the difficulty to demonstrate completeness of timing test. The analysis technique has also a demerit of resulting in extreme times that not actually possible. Thus, the establishment of the systematic response time evaluation methodology is needed to justify the conformance to the response time requirement used in the safety analysis. This paper proposes the response time evaluation methodology for APR1400 and OPR1000 using the combined analysis and test technique to confirm that the plant protection system can meet the analytical response time assumed in the safety analysis. In addition, the results of the quantitative evaluation performed for APR1400 and OPR1000 are presented in this paper. The proposed response time analysis technique consists of defining the response time requirement, determining the critical signal path for the trip parameter, allocating individual response time to each component on the signal path, and analyzing the total response time for the trip parameter, and demonstrates that the total analyzed response time does not exceed the response time requirement. The proposed response time test technique is composed of defining the response time requirement, determining the critical signal path for the trip parameter, determining the test method for each component on the signal path, performing the response time test, and demonstrates that the total test result does not exceed the response time requirement. The total response time should be tested in a single test that covers from the sensor to the final actuation device on the instrument channel. When the total channel is not tested in a single test, separate tests on groups of components or single components including the total instrument channel shall be combined to verify the total channel response. For APR1400 and OPR1000, the ramp test technique is used for the pressure and differential pressure transmitters and the step function testing technique is applied to the signal processing equipment and final actuation device. As a result, it can be demonstrated that the response time requirement is satisfied by the combined analysis and test technique. Therefore, the proposed methodology in this paper plays a crucial role in guaranteeing the safety of the nuclear power plants systematically satisfying one of two critical requirements from the safety analysis. (authors)« less

  4. Time required for motor activity in lucid dreams.

    PubMed

    Erlacher, Daniel; Schredl, Michael

    2004-12-01

    The present study investigated the relationship between the time required for specific tasks (counting and performing squats) in lucid dreams and in the waking state. Five proficient lucid dreamers (26-34 yr. old, M=29.8, SD=3.0; one woman and four men) participated. Analysis showed that the time needed for counting in a lucid dream is comparable to the time needed for counting in wakefulness, but motor activities required more time in lucid dreams than in the waking state.

  5. 7 CFR 70.71 - On a fee basis.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... required to perform the work, waiting time, travel time, and any clerical costs involved in issuing a... perform the audit, waiting time, travel time, travel expenses and any clerical costs involved in issuing a... specified in this section. (b) Fees for grading services will be based on the time required to perform such...

  6. 7 CFR 70.71 - On a fee basis.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... required to perform the work, waiting time, travel time, and any clerical costs involved in issuing a... perform the audit, waiting time, travel time, travel expenses and any clerical costs involved in issuing a... specified in this section. (b) Fees for grading services will be based on the time required to perform such...

  7. 7 CFR 70.71 - On a fee basis.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... required to perform the work, waiting time, travel time, and any clerical costs involved in issuing a... perform the audit, waiting time, travel time, travel expenses and any clerical costs involved in issuing a... specified in this section. (b) Fees for grading services will be based on the time required to perform such...

  8. 7 CFR 70.71 - On a fee basis.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... required to perform the work, waiting time, travel time, and any clerical costs involved in issuing a... perform the audit, waiting time, travel time, travel expenses and any clerical costs involved in issuing a... specified in this section. (b) Fees for grading services will be based on the time required to perform such...

  9. 7 CFR 70.71 - On a fee basis.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... required to perform the work, waiting time, travel time, and any clerical costs involved in issuing a... perform the audit, waiting time, travel time, travel expenses and any clerical costs involved in issuing a... specified in this section. (b) Fees for grading services will be based on the time required to perform such...

  10. Space station needs, attributes, and architectural options study. Volume 1: Missions and requirements

    NASA Technical Reports Server (NTRS)

    1983-01-01

    Science and applications, NOAA environmental observation, commercial resource observations, commercial space processing, commercial communications, national security, technology development, and GEO servicing are addressed. Approach to time phasing of mission requirements, system sizing summary, time-phased user mission payload support, space station facility requirements, and integrated time-phased system requirements are also addressed.

  11. 11 CFR 9410.4 - Times, places, and requirements for identification of individuals making requests.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 11 Federal Elections 1 2010-01-01 2010-01-01 false Times, places, and requirements for... COMMISSION IMPLEMENTATION OF THE PRIVACY ACT OF 1974 § 9410.4 Times, places, and requirements for... describing the record system. (c) Proof of identity as required by paragraph (b)(2) of this section shall be...

  12. Differences in care burden of patients undergoing dialysis in different centres in the netherlands.

    PubMed

    de Kleijn, Ria; Uyl-de Groot, Carin; Hagen, Chris; Diepenbroek, Adry; Pasker-de Jong, Pieternel; Ter Wee, Piet

    2017-06-01

    A classification model was developed to simplify planning of personnel at dialysis centres. This model predicted the care burden based on dialysis characteristics. However, patient characteristics and different dialysis centre categories might also influence the amount of care time required. To determine if there is a difference in care burden between different categories of dialysis centres and if specific patient characteristics predict nursing time needed for patient treatment. An observational study. Two hundred and forty-two patients from 12 dialysis centres. In 12 dialysis centres, nurses filled out the classification list per patient and completed a form with patient characteristics. Nephrologists filled out the Charlson Comorbidity Index. Independent observers clocked the time nurses spent on separate steps of the dialysis for each patient. Dialysis centres were categorised into four types. Data were analysed using regression models. In contrast to other dialysis centres, academic centres needed 14 minutes more care time per patient per dialysis treatment than predicted in the classification model. No patient characteristics were found that influenced this difference. The only patient characteristic that predicted the time required was gender, with more time required to treat women. Gender did not affect the difference between measured and predicted care time. Differences in care burden were observed between academic and other centres, with more time required for treatment in academic centres. Contribution of patient characteristics to the time difference was minimal. The only patient characteristics that predicted care time were previous transplantation, which reduced the time required, and gender, with women requiring more care time. © 2017 European Dialysis and Transplant Nurses Association/European Renal Care Association.

  13. Time to Criterion: An Experimental Study.

    ERIC Educational Resources Information Center

    Anderson, Lorin W.

    The purpose of the study was to investigate the magnitude of individual differences in time-to-criterion and the stability of these differences. Time-to-criterion was defined in two ways: the amount of elapsed time required to attain the criterion level and the amount of on-task time required to attain the criterion level. Ninety students were…

  14. Analysis of pilot response time to time-critical air traffic control calls

    DOT National Transportation Integrated Search

    1991-08-01

    One of the most important time-critical air traffic control messages for a pilot is one : that required an immediate maneuver for traffic avoidance. This study examines the time : required for an air traffic controller to successfully transmit such a...

  15. The relationship between worker, occupational and workplace characteristics and whether an injury requires time off work: a matched case-control analysis in Ontario, Canada.

    PubMed

    Smith, Peter; Chen, Cynthia; Mustard, Cameron; Hogg-Johnson, Sheilah; Tompa, Emile

    2015-04-01

    The objective of this study was to examine individual, occupational, and workplace level factors associated with time loss following a similar injury. Seven thousand three hundred and forty-eight workers' compensation claims that did not require time off work were matched with up to four claims that required time off work on the event, nature, and part of body injured as well as injury year. Conditional logistic regression models examined individual, occupational, and workplace level factors that were associated with the likelihood of not requiring time off work. Employees from firms with higher premium rates were more likely to report no time loss from work and workers in more physically demanding occupations were less likely to report no time loss from work. We observed no association between age or gender and the probability of a time loss claim submission. Our results suggest that insurance costs are an incentive for workplaces to adopt policies and practices that minimize time loss following a work injury. © 2015 Wiley Periodicals, Inc.

  16. 1 CFR 455.4 - Times, places, and requirements for identification of individuals making requests.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 1 General Provisions 1 2010-01-01 2010-01-01 false Times, places, and requirements for identification of individuals making requests. 455.4 Section 455.4 General Provisions MISCELLANEOUS AGENCIES NATIONAL CAPITAL PLANNING COMMISSION (PRIVACY ACT REGULATIONS) § 455.4 Times, places, and requirements for...

  17. 42 CFR 84.83 - Timers; elapsed time indicators; remaining service life indicators; minimum requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 1 2011-10-01 2011-10-01 false Timers; elapsed time indicators; remaining service life indicators; minimum requirements. 84.83 Section 84.83 Public Health PUBLIC HEALTH SERVICE... indicators; remaining service life indicators; minimum requirements. (a) Elapsed time indicators shall be...

  18. 42 CFR 84.83 - Timers; elapsed time indicators; remaining service life indicators; minimum requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Timers; elapsed time indicators; remaining service life indicators; minimum requirements. 84.83 Section 84.83 Public Health PUBLIC HEALTH SERVICE... indicators; remaining service life indicators; minimum requirements. (a) Elapsed time indicators shall be...

  19. The SmartOR: a distributed sensor network to improve operating room efficiency.

    PubMed

    Huang, Albert Y; Joerger, Guillaume; Fikfak, Vid; Salmon, Remi; Dunkin, Brian J; Bass, Barbara L; Garbey, Marc

    2017-09-01

    Despite the significant expense of OR time, best practice achieves only 70% efficiency. Compounding this problem is a lack of real-time data. Most current OR utilization programs require manual data entry. Automated systems require installation and maintenance of expensive tracking hardware throughout the institution. This study developed an inexpensive, automated OR utilization system and analyzed data from multiple operating rooms. OR activity was deconstructed into four room states. A sensor network was then developed to automatically capture these states using only three sensors, a local wireless network, and a data capture computer. Two systems were then installed into two ORs, recordings captured 24/7. The SmartOR recorded the following events: any room activity, patient entry/exit time, anesthesia time, laparoscopy time, room turnover time, and time of preoperative patient identification by the surgeon. From November 2014 to December 2015, data on 1003 cases were collected. The mean turnover time was 36 min, and 38% of cases met the institutional goal of ≤30 min. Data analysis also identified outlier cases (>1 SD from mean) in the domains of time from patient entry into the OR to intubation (11% of cases) and time from extubation to patient exiting the OR (11% of cases). Time from surgeon identification of patient to scheduled procedure start time was 11 min (institution bylaws require 20 min before scheduled start time), yet OR teams required 22 min on average to bring a patient into the room after surgeon identification. The SmartOR automatically and reliably captures data on OR room state and, in real time, identifies outlier cases that may be examined closer to improve efficiency. As no manual entry is required, the data are indisputable and allow OR teams to maintain a patient-centric focus.

  20. 75 FR 55851 - Flightcrew Member Duty and Rest Requirements

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-14

    ... requirements based on the time of day, whether an individual is acclimated to a new time zone, and the.... Joint Responsibility C. Fatigue Training D. Flight Duty Period E. Acclimating to a New Time Zone F. Daily Flight Time Restrictions G. Mitigation Strategies 1. Augmentation 2. Split Duty Rest H...

  1. 75 FR 22804 - Submission for OMB Review; American Recovery and Reinvestment Act-One-Time Reporting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-30

    ... Recovery and Reinvestment Act--One-Time Reporting, Compensation Requirements AGENCIES: Department of... and Reinvestment Act--One-time Reporting, Compensation Requirements published in the Federal Register...

  2. Evaluation of STAT medication ordering process in a community hospital.

    PubMed

    Abdelaziz, Hani; Richardson, Sandra; Walsh, Kim; Nodzon, Jessica; Schwartz, Barbara

    2016-01-01

    In most health care facilities, problems related to delays in STAT medication order processing time are of common concern. The purpose of this study was to evaluate processing time for STAT orders at Kimball Medical Center. All STAT orders were reviewed to determine processing time; order processing time was also stratified by physician order entry (physician entered (PE) orders vs. non-physician entered (NPE) orders). Collected data included medication ordered, indication, time ordered, time verified by pharmacist, time sent from pharmacy, and time charted as given to the patient. A total of 502 STAT orders were reviewed and 389 orders were included for analysis. Overall, median time was 29 minutes, IQR 16-63; p<0.0001.). The time needed to process NPE orders was significantly less than that needed for PE orders (median 27 vs. 34 minutes; p=0.026). In terms of NPE orders, the median total time required to process STAT orders for medications available in the Automated Dispensing Devices (ADM) was within 30 minutes, while that required to process orders for medications not available in the ADM was significantly greater than 30 minutes. For PE orders, the median total time required to process orders for medications available in the ADM (i.e., not requiring pharmacy involvement) was significantly greater than 30 minutes. [Median time = 34 minutes (p<0.001)]. We conclude that STAT order processing time may be improved by increasing the availability of medications in ADM, and pharmacy involvement in the verification process.

  3. 40 CFR 96.341 - Timing requirements for CAIR NOX Ozone Season allowance allocations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 22 2012-07-01 2012-07-01 false Timing requirements for CAIR NOX Ozone... PROGRAMS FOR STATE IMPLEMENTATION PLANS CAIR NOX Ozone Season Allowance Allocations § 96.341 Timing requirements for CAIR NOX Ozone Season allowance allocations. (a) By October 31, 2006, the permitting authority...

  4. 40 CFR 97.341 - Timing requirements for CAIR NOX Ozone Season allowance allocations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 22 2013-07-01 2013-07-01 false Timing requirements for CAIR NOX Ozone... TRADING PROGRAMS CAIR NOX Ozone Season Allowance Allocations § 97.341 Timing requirements for CAIR NOX Ozone Season allowance allocations. (a) The Administrator will determine by order the CAIR NOX Ozone...

  5. 40 CFR 97.341 - Timing requirements for CAIR NOX Ozone Season allowance allocations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false Timing requirements for CAIR NOX Ozone... TRADING PROGRAMS CAIR NOX Ozone Season Allowance Allocations § 97.341 Timing requirements for CAIR NOX Ozone Season allowance allocations. (a) The Administrator will determine by order the CAIR NOX Ozone...

  6. 40 CFR 96.341 - Timing requirements for CAIR NOX Ozone Season allowance allocations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 21 2011-07-01 2011-07-01 false Timing requirements for CAIR NOX Ozone... PROGRAMS FOR STATE IMPLEMENTATION PLANS CAIR NOX Ozone Season Allowance Allocations § 96.341 Timing requirements for CAIR NOX Ozone Season allowance allocations. (a) By October 31, 2006, the permitting authority...

  7. 40 CFR 96.341 - Timing requirements for CAIR NOX Ozone Season allowance allocations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false Timing requirements for CAIR NOX Ozone... PROGRAMS FOR STATE IMPLEMENTATION PLANS CAIR NOX Ozone Season Allowance Allocations § 96.341 Timing requirements for CAIR NOX Ozone Season allowance allocations. (a) By October 31, 2006, the permitting authority...

  8. 40 CFR 96.341 - Timing requirements for CAIR NOX Ozone Season allowance allocations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 21 2014-07-01 2014-07-01 false Timing requirements for CAIR NOX Ozone... PROGRAMS FOR STATE IMPLEMENTATION PLANS CAIR NOX Ozone Season Allowance Allocations § 96.341 Timing requirements for CAIR NOX Ozone Season allowance allocations. (a) By October 31, 2006, the permitting authority...

  9. 40 CFR 97.341 - Timing requirements for CAIR NOX Ozone Season allowance allocations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 21 2011-07-01 2011-07-01 false Timing requirements for CAIR NOX Ozone... TRADING PROGRAMS CAIR NOX Ozone Season Allowance Allocations § 97.341 Timing requirements for CAIR NOX Ozone Season allowance allocations. (a) The Administrator will determine by order the CAIR NOX Ozone...

  10. 40 CFR 97.341 - Timing requirements for CAIR NOX Ozone Season allowance allocations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 22 2012-07-01 2012-07-01 false Timing requirements for CAIR NOX Ozone... TRADING PROGRAMS CAIR NOX Ozone Season Allowance Allocations § 97.341 Timing requirements for CAIR NOX Ozone Season allowance allocations. (a) The Administrator will determine by order the CAIR NOX Ozone...

  11. 40 CFR 97.341 - Timing requirements for CAIR NOX Ozone Season allowance allocations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 21 2014-07-01 2014-07-01 false Timing requirements for CAIR NOX Ozone... TRADING PROGRAMS CAIR NOX Ozone Season Allowance Allocations § 97.341 Timing requirements for CAIR NOX Ozone Season allowance allocations. (a) The Administrator will determine by order the CAIR NOX Ozone...

  12. 40 CFR 96.341 - Timing requirements for CAIR NOX Ozone Season allowance allocations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 22 2013-07-01 2013-07-01 false Timing requirements for CAIR NOX Ozone... PROGRAMS FOR STATE IMPLEMENTATION PLANS CAIR NOX Ozone Season Allowance Allocations § 96.341 Timing requirements for CAIR NOX Ozone Season allowance allocations. (a) By October 31, 2006, the permitting authority...

  13. 18 CFR 1301.14 - Times, places, and requirements for identification of individuals making requests.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Times, places, and... and Water Resources TENNESSEE VALLEY AUTHORITY PROCEDURES Privacy Act § 1301.14 Times, places, and requirements for identification of individuals making requests. (a) TVA will require proof of identity, in...

  14. 41 CFR 51-9.302 - Times, places and requirements for access requests.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 1 2010-07-01 2010-07-01 true Times, places and requirements for access requests. 51-9.302 Section 51-9.302 Public Contracts and Property Management Other... Director may require a notarized statement of identity. The Executive Director shall ensure that such times...

  15. 11 CFR 1.4 - Times, places, and requirements for identification of individuals making requests.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 11 Federal Elections 1 2010-01-01 2010-01-01 false Times, places, and requirements for identification of individuals making requests. 1.4 Section 1.4 Federal Elections FEDERAL ELECTION COMMISSION PRIVACY ACT § 1.4 Times, places, and requirements for identification of individuals making requests. (a...

  16. 75 FR 37712 - Temporary Suspension of Certain Oil Spill Response Time Requirements To Support Deepwater Horizon...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-30

    .... (Memorandum from Rear Admiral J.A. Watson, FOSC BP Deepwater Horizon Oil Spill, to National Incident Command... Temporary Suspension of Certain Oil Spill Response Time Requirements To Support Deepwater Horizon Oil Spill... Protection Agency (EPA) temporary interim rule will suspend oil spill response time requirements, and certain...

  17. Time management in radiation oncology: evaluation of time, attendance of medical staff, and resources during radiotherapy for prostate cancer: the DEGRO-QUIRO trial.

    PubMed

    Keilholz, L; Willner, J; Thiel, H-J; Zamboglou, N; Sack, H; Popp, W

    2014-01-01

    In order to evaluate resource requirements, the German Society of Radiation Oncology (DEGRO) recorded the times needed for core procedures in the radio-oncological treatment of various cancer types within the scope of its QUIRO trial. The present study investigated the personnel and infrastructural resources required in radiotherapy of prostate cancer. The investigation was carried out in the setting of definitive radiotherapy of prostate cancer patients between July and October 2008 at two radiotherapy centers, both with well-trained staff and modern technical facilities at their disposal. Personnel attendance times and room occupancy times required for core procedures (modules) were each measured prospectively by two independently trained observers using time measurements differentiated on the basis of professional group (physician, physicist, and technician), 3D conformal (3D-cRT), and intensity-modulated radiotherapy (IMRT). Total time requirements of 983 min for 3D-cRT and 1485 min for step-and-shoot IMRT were measured for the technician (in terms of professional group) in all modules recorded and over the entire course of radiotherapy for prostate cancer (72-76 Gy). Times needed for the medical specialist/physician were 255 min (3D-cRT) and 271 min (IMRT), times of the physicist were 181 min (3D-cRT) and 213 min (IMRT). The difference in time was significant, although variations in time spans occurred primarily as a result of various problems during patient treatment. This investigation has permitted, for the first time, a realistic estimation of average personnel and infrastructural requirements for core procedures in quality-assured definitive radiotherapy of prostate cancer. The increased time needed for IMRT applies to the step-and-shoot procedure with verification measurements for each irradiation planning.

  18. How many research nurses for how many clinical trials in an oncology setting? Definition of the Nursing Time Required by Clinical Trial-Assessment Tool (NTRCT-AT).

    PubMed

    Milani, Alessandra; Mazzocco, Ketti; Stucchi, Sara; Magon, Giorgio; Pravettoni, Gabriella; Passoni, Claudia; Ciccarelli, Chiara; Tonali, Alessandra; Profeta, Teresa; Saiani, Luisa

    2017-02-01

    Few resources are available to quantify clinical trial-associated workload, needed to guide staffing and budgetary planning. The aim of the study is to describe a tool to measure clinical trials nurses' workload expressed in time spent to complete core activities. Clinical trials nurses drew up a list of nursing core activities, integrating results from literature searches with personal experience. The final 30 core activities were timed for each research nurse by an outside observer during daily practice in May and June 2014. Average times spent by nurses for each activity were calculated. The "Nursing Time Required by Clinical Trial-Assessment Tool" was created as an electronic sheet that combines the average times per specified activities and mathematic functions to return the total estimated time required by a research nurse for each specific trial. The tool was tested retrospectively on 141 clinical trials. The increasing complexity of clinical research requires structured approaches to determine workforce requirements. This study provides a tool to describe the activities of a clinical trials nurse and to estimate the associated time required to deliver individual trials. The application of the proposed tool in clinical research practice could provide a consistent structure for clinical trials nursing workload estimation internationally. © 2016 John Wiley & Sons Australia, Ltd.

  19. Capabilities needed for the next generation of thermo-hydraulic codes for use in real time applications

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Arndt, S.A.

    1997-07-01

    The real-time reactor simulation field is currently at a crossroads in terms of the capability to perform real-time analysis using the most sophisticated computer codes. Current generation safety analysis codes are being modified to replace simplified codes that were specifically designed to meet the competing requirement for real-time applications. The next generation of thermo-hydraulic codes will need to have included in their specifications the specific requirement for use in a real-time environment. Use of the codes in real-time applications imposes much stricter requirements on robustness, reliability and repeatability than do design and analysis applications. In addition, the need for codemore » use by a variety of users is a critical issue for real-time users, trainers and emergency planners who currently use real-time simulation, and PRA practitioners who will increasingly use real-time simulation for evaluating PRA success criteria in near real-time to validate PRA results for specific configurations and plant system unavailabilities.« less

  20. A Scheduling Algorithm for Replicated Real-Time Tasks

    NASA Technical Reports Server (NTRS)

    Yu, Albert C.; Lin, Kwei-Jay

    1991-01-01

    We present an algorithm for scheduling real-time periodic tasks on a multiprocessor system under fault-tolerant requirement. Our approach incorporates both the redundancy and masking technique and the imprecise computation model. Since the tasks in hard real-time systems have stringent timing constraints, the redundancy and masking technique are more appropriate than the rollback techniques which usually require extra time for error recovery. The imprecise computation model provides flexible functionality by trading off the quality of the result produced by a task with the amount of processing time required to produce it. It therefore permits the performance of a real-time system to degrade gracefully. We evaluate the algorithm by stochastic analysis and Monte Carlo simulations. The results show that the algorithm is resilient under hardware failures.

  1. Time On Station Requirements: Costs, Policy Change, and Perceptions

    DTIC Science & Technology

    2016-12-01

    Travel Management Office (2016). .........................................................................6  Table 3.  Time it took spouses to find...NAVAL POSTGRADUATE SCHOOL MONTEREY, CALIFORNIA MBA PROFESSIONAL REPORT TIME ON STATION REQUIREMENTS: COSTS, POLICY CHANGE, AND...reporting burden for this collection of information is estimated to average 1 hour per response, including the time for reviewing instruction, searching

  2. 29 CFR 553.20 - Introduction.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... required under section 7. Compensatory time received by an employee in lieu of cash must be at the rate of not less than one and one-half hours of compensatory time for each hour of overtime work, just as the... Time and Compensatory Time Off § 553.20 Introduction. Section 7 of the FLSA requires that covered...

  3. 40 CFR 97.511 - Timing requirements for TR NOX Ozone Season allowance allocations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 22 2012-07-01 2012-07-01 false Timing requirements for TR NOX Ozone... TRADING PROGRAMS TR NOX Ozone Season Trading Program § 97.511 Timing requirements for TR NOX Ozone Season allowance allocations. (a) Existing units. (1) TR NOX Ozone Season allowances are allocated, for the control...

  4. 40 CFR 97.511 - Timing requirements for TR NOX Ozone Season allowance allocations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 22 2013-07-01 2013-07-01 false Timing requirements for TR NOX Ozone... TRADING PROGRAMS TR NOX Ozone Season Trading Program § 97.511 Timing requirements for TR NOX Ozone Season allowance allocations. (a) Existing units. (1) TR NOX Ozone Season allowances are allocated, for the control...

  5. 40 CFR 97.511 - Timing requirements for TR NOX Ozone Season allowance allocations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 21 2014-07-01 2014-07-01 false Timing requirements for TR NOX Ozone... TRADING PROGRAMS TR NOX Ozone Season Trading Program § 97.511 Timing requirements for TR NOX Ozone Season allowance allocations. (a) Existing units. (1) TR NOX Ozone Season allowances are allocated, for the control...

  6. 19 CFR 192.14 - Electronic information for outward cargo required in advance of departure.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    .... Specifically, to effect the advance electronic transmission of the required cargo information to CBP, the USPPI... two hours prior to the arrival of the train at the border. (2) Applicability of time frames. The time... compliance with the time frames provided in paragraph (b)(1) of this section. Requirements placed on exports...

  7. 5 CFR 2429.21 - Computation of time for filing papers.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 5 Administrative Personnel 3 2011-01-01 2011-01-01 false Computation of time for filing papers... REQUIREMENTS General Requirements § 2429.21 Computation of time for filing papers. (a) In computing any period... § 2429.23(a) of this part, when this subchapter requires the filing of any paper with the Authority, the...

  8. 22 CFR 1429.21 - Computation of time for filing papers.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 22 Foreign Relations 2 2010-04-01 2010-04-01 true Computation of time for filing papers. 1429.21... MISCELLANEOUS AND GENERAL REQUIREMENTS General Requirements § 1429.21 Computation of time for filing papers. In... subchapter requires the filing of any paper, such document must be received by the Board or the officer or...

  9. Time Requirements for the Different Item Types Proposed for Use in the Revised SAT®. Research Report No. 2007-3. ETS RR-07-35

    ERIC Educational Resources Information Center

    Bridgeman, Brent; Laitusis, Cara Cahalan; Cline, Frederick

    2007-01-01

    The current study used three data sources to estimate time requirements for different item types on the now current SAT Reasoning Test™. First, we estimated times from a computer-adaptive version of the SAT® (SAT CAT) that automatically recorded item times. Second, we observed students as they answered SAT questions under strict time limits and…

  10. The Effect of Violations of the Constant Demand Assumption on the Defense Logistic Agency Requirements Model

    DTIC Science & Technology

    1994-09-01

    Pipeline stock is calculated by forecasting the projected requirements due to transportation time and counting out the amount of stock needed to cover...the "lead time" delay. Time needed for the transportation of an order is referred to as the lead time. "Lead time is the amount of time between the...Defenae Logistica Agency The Defense Logistics Agency (DLA) is an agency of the Department of Defense. "The National Security Act (NSA) established

  11. A Study on the Effectiveness of Lockup-Free Caches for a Reduced Instruction Set Computer (RISC) Processor

    DTIC Science & Technology

    1992-09-01

    to acquire or develop effective simulation tools to observe the behavior of a RISC implementation as it executes different types of programs . We choose...Performance Computer performance is measured by the amount of the time required to execute a program . Performance encompasses two types of time, elapsed time...and CPU time. Elapsed time is the time required to execute a program from start to finish. It includes latency of input/output activities such as

  12. Modeling operators' emergency response time for chemical processing operations.

    PubMed

    Murray, Susan L; Harputlu, Emrah; Mentzer, Ray A; Mannan, M Sam

    2014-01-01

    Operators have a crucial role during emergencies at a variety of facilities such as chemical processing plants. When an abnormality occurs in the production process, the operator often has limited time to either take corrective actions or evacuate before the situation becomes deadly. It is crucial that system designers and safety professionals can estimate the time required for a response before procedures and facilities are designed and operations are initiated. There are existing industrial engineering techniques to establish time standards for tasks performed at a normal working pace. However, it is reasonable to expect the time required to take action in emergency situations will be different than working at a normal production pace. It is possible that in an emergency, operators will act faster compared to a normal pace. It would be useful for system designers to be able to establish a time range for operators' response times for emergency situations. This article develops a modeling approach to estimate the time standard range for operators taking corrective actions or following evacuation procedures in emergency situations. This will aid engineers and managers in establishing time requirements for operators in emergency situations. The methodology used for this study combines a well-established industrial engineering technique for determining time requirements (predetermined time standard system) and adjustment coefficients for emergency situations developed by the authors. Numerous videos of workers performing well-established tasks at a maximum pace were studied. As an example, one of the tasks analyzed was pit crew workers changing tires as quickly as they could during a race. The operations in these videos were decomposed into basic, fundamental motions (such as walking, reaching for a tool, and bending over) by studying the videos frame by frame. A comparison analysis was then performed between the emergency pace and the normal working pace operations to determine performance coefficients. These coefficients represent the decrease in time required for various basic motions in emergency situations and were used to model an emergency response. This approach will make hazardous operations requiring operator response, alarm management, and evacuation processes easier to design and predict. An application of this methodology is included in the article. The time required for an emergency response was roughly a one-third faster than for a normal response time.

  13. Evaluation of STAT medication ordering process in a community hospital

    PubMed Central

    Walsh., Kim; Schwartz., Barbara

    Background: In most health care facilities, problems related to delays in STAT medication order processing time are of common concern. Objective: The purpose of this study was to evaluate processing time for STAT orders at Kimball Medical Center. Methods: All STAT orders were reviewed to determine processing time; order processing time was also stratified by physician order entry (physician entered (PE) orders vs. non-physician entered (NPE) orders). Collected data included medication ordered, indication, time ordered, time verified by pharmacist, time sent from pharmacy, and time charted as given to the patient. Results: A total of 502 STAT orders were reviewed and 389 orders were included for analysis. Overall, median time was 29 minutes, IQR 16–63; p<0.0001.). The time needed to process NPE orders was significantly less than that needed for PE orders (median 27 vs. 34 minutes; p=0.026). In terms of NPE orders, the median total time required to process STAT orders for medications available in the Automated Dispensing Devices (ADM) was within 30 minutes, while that required to process orders for medications not available in the ADM was significantly greater than 30 minutes. For PE orders, the median total time required to process orders for medications available in the ADM (i.e., not requiring pharmacy involvement) was significantly greater than 30 minutes. [Median time = 34 minutes (p<0.001)]. Conclusion: We conclude that STAT order processing time may be improved by increasing the availability of medications in ADM, and pharmacy involvement in the verification process. PMID:27382418

  14. Comparison of time required for traditional versus virtual orthognathic surgery treatment planning.

    PubMed

    Wrzosek, M K; Peacock, Z S; Laviv, A; Goldwaser, B R; Ortiz, R; Resnick, C M; Troulis, M J; Kaban, L B

    2016-09-01

    Virtual surgical planning (VSP) is a tool for predicting complex surgical movements in three dimensions and it may reduce preoperative laboratory time. A prospective study to compare the time required for standard preoperative planning versus VSP was conducted at Massachusetts General Hospital from January 2014 through January 2015. Workflow data for bimaxillary cases planned by both standard techniques and VSP were recorded in real time. Time spent was divided into three parts: (1) obtaining impressions, face-bow mounting, and model preparation; (2) occlusal analysis and modification, model surgery, and splint fabrication; (3) online VSP session. Average times were compared between standard treatment planning (sum of parts 1 and 2) and VSP (sum of parts 1 and 3). Of 41 bimaxillary cases included, 20 were simple (symmetric) and 21 were complex (asymmetry and segmental osteotomies). Average times for parts 1, 2, and 3 were 4.43, 3.01, and 0.67h, respectively. The average time required for standard treatment planning was 7.45h and for VSP was 5.10h, a 31% time reduction (P<0.001). By eliminating all or some components of part 1, time savings may increase to as much as 91%. This study indicates that in an academic setting, VSP reduces the time required for treatment planning of bimaxillary orthognathic surgery cases. Copyright © 2016 International Association of Oral and Maxillofacial Surgeons. Published by Elsevier Ltd. All rights reserved.

  15. Computer considerations for real time simulation of a generalized rotor model

    NASA Technical Reports Server (NTRS)

    Howe, R. M.; Fogarty, L. E.

    1977-01-01

    Scaled equations were developed to meet requirements for real time computer simulation of the rotor system research aircraft. These equations form the basis for consideration of both digital and hybrid mechanization for real time simulation. For all digital simulation estimates of the required speed in terms of equivalent operations per second are developed based on the complexity of the equations and the required intergration frame rates. For both conventional hybrid simulation and hybrid simulation using time-shared analog elements the amount of required equipment is estimated along with a consideration of the dynamic errors. Conventional hybrid mechanization using analog simulation of those rotor equations which involve rotor-spin frequencies (this consititutes the bulk of the equations) requires too much analog equipment. Hybrid simulation using time-sharing techniques for the analog elements appears possible with a reasonable amount of analog equipment. All-digital simulation with affordable general-purpose computers is not possible because of speed limitations, but specially configured digital computers do have the required speed and consitute the recommended approach.

  16. Math Requirement Fulfillment and Educational Success of Community College Students: A Matter of When

    ERIC Educational Resources Information Center

    Wang, Xueli; Wang, Yan; Wickersham, Kelly; Sun, Ning; Chan, Hsun-yu

    2017-01-01

    Objective: In community colleges, achieving competence in math is critical to students' timely progression through coursework and eventual educational success; yet, it remains unclear when the optimal timing to complete required math courses is in order to maximize the chance of completing a credential on time. This study examines the timing of…

  17. 14 CFR 91.1057 - Flight, duty and rest time requirements: All crewmembers.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... cabin-safety-related responsibilities. Multi-time zone flight means an easterly or westerly flight or multiple flights in one direction in the same duty period that results in a time zone difference of 5 or... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Flight, duty and rest time requirements...

  18. Time assignment system and its performance aboard the Hitomi satellite

    NASA Astrophysics Data System (ADS)

    Terada, Yukikatsu; Yamaguchi, Sunao; Sugimoto, Shigenobu; Inoue, Taku; Nakaya, Souhei; Murakami, Maika; Yabe, Seiya; Oshimizu, Kenya; Ogawa, Mina; Dotani, Tadayasu; Ishisaki, Yoshitaka; Mizushima, Kazuyo; Kominato, Takashi; Mine, Hiroaki; Hihara, Hiroki; Iwase, Kaori; Kouzu, Tomomi; Tashiro, Makoto S.; Natsukari, Chikara; Ozaki, Masanobu; Kokubun, Motohide; Takahashi, Tadayuki; Kawakami, Satoko; Kasahara, Masaru; Kumagai, Susumu; Angelini, Lorella; Witthoeft, Michael

    2018-01-01

    Fast timing capability in x-ray observation of astrophysical objects is one of the key properties for the ASTRO-H (Hitomi) mission. Absolute timing accuracies of 350 or 35 μs are required to achieve nominal scientific goals or to study fast variabilities of specific sources. The satellite carries a GPS receiver to obtain accurate time information, which is distributed from the central onboard computer through the large and complex SpaceWire network. The details of the time system on the hardware and software design are described. In the distribution of the time information, the propagation delays and jitters affect the timing accuracy. Six other items identified within the timing system will also contribute to absolute time error. These error items have been measured and checked on ground to ensure the time error budgets meet the mission requirements. The overall timing performance in combination with hardware performance, software algorithm, and the orbital determination accuracies, etc. under nominal conditions satisfies the mission requirements of 35 μs. This work demonstrates key points for space-use instruments in hardware and software designs and calibration measurements for fine timing accuracy on the order of microseconds for midsized satellites using the SpaceWire (IEEE1355) network.

  19. A Metrics-Based Approach to Intrusion Detection System Evaluation for Distributed Real-Time Systems

    DTIC Science & Technology

    2002-04-01

    Based Approach to Intrusion Detection System Evaluation for Distributed Real - Time Systems Authors: G. A. Fink, B. L. Chappell, T. G. Turner, and...Distributed, Security. 1 Introduction Processing and cost requirements are driving future naval combat platforms to use distributed, real - time systems of...distributed, real - time systems . As these systems grow more complex, the timing requirements do not diminish; indeed, they may become more constrained

  20. Review of registration requirements for new part-time doctors in New Zealand, Australia, the United Kingdom, Ireland and Canada.

    PubMed

    Leitch, Sharon; Dovey, Susan M

    2010-12-01

    By the time medical students graduate many wish to work part-time while accommodating other lifestyle interests. To review flexibility of medical registration requirements for provisional registrants in New Zealand, Australia, the United Kingdom, Ireland and Canada. Internet-based review of registration bodies of each country, and each state or province in Australia and Canada, supplemented by emails and phone calls seeking clarification of missing or obscure information. Data from 20 regions were examined. Many similarities were found between study countries in their approaches to the registration of new doctors, although there are some regional differences. Most regions (65%) have a provisional registration period of one year. Extending this period was possible in 91% of regions. Part-time options were possible in 75% of regions. All regions required trainees to work in approved practice settings. Only the UK provided comprehensive documentation of their requirements in an accessible format and clearly explaining the options for part-time work. Australia appeared to be more flexible than other countries with respect to part- and full-time work requirements. All countries need to examine their registration requirements to introduce more flexibility wherever possible, as a strategy for addressing workforce shortages.

  1. 22 CFR 215.4 - Times, places, and requirements for identification of individuals making requests.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Times, places, and requirements for... DEVELOPMENT REGULATIONS FOR IMPLEMENTATION OF PRIVACY ACT OF 1974 § 215.4 Times, places, and requirements for... or contest may do so at the place designated in paragraph (a) of § 215.3, which is open 9 a.m. to 5 p...

  2. Optical fiber repeatered transmission systems utilizing SAW filters

    NASA Astrophysics Data System (ADS)

    Rosenberg, R. L.; Ross, D. G.; Trischitta, P. R.; Fishman, D. A.; Armitage, C. B.

    1983-05-01

    Baseband digital transmission-line systems capable of signaling rates of several hundred to several thousand Mbit/s are presently being developed around the world. The pulse regeneration process is gated by a timing wave which is synchronous with the symbol rate of the arriving pulse stream. Synchronization is achieved by extracting a timing wave from the arriving pulse stream, itself. To date, surface acoustic-wave (SAW) filters have been widely adopted for timing recovery in the in-line regenerators of high-bit-rate systems. The present investigation has the objective to acquaint the SAW community in general, and SAW filter suppliers in particular, with the requirements for timing recovery filters in repeatered digital transmission systems. Attention is given to the system structure, the timing loop function, the system requirements affecting the timing-recovery filter, the decision process, timing jitter accumulation, the filter 'ringing' requirement, and aspects of reliability.

  3. A time-dependent neutron transport method of characteristics formulation with time derivative propagation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hoffman, Adam J., E-mail: adamhoff@umich.edu; Lee, John C., E-mail: jcl@umich.edu

    2016-02-15

    A new time-dependent Method of Characteristics (MOC) formulation for nuclear reactor kinetics was developed utilizing angular flux time-derivative propagation. This method avoids the requirement of storing the angular flux at previous points in time to represent a discretized time derivative; instead, an equation for the angular flux time derivative along 1D spatial characteristics is derived and solved concurrently with the 1D transport characteristic equation. This approach allows the angular flux time derivative to be recast principally in terms of the neutron source time derivatives, which are approximated to high-order accuracy using the backward differentiation formula (BDF). This approach, called Sourcemore » Derivative Propagation (SDP), drastically reduces the memory requirements of time-dependent MOC relative to methods that require storing the angular flux. An SDP method was developed for 2D and 3D applications and implemented in the computer code DeCART in 2D. DeCART was used to model two reactor transient benchmarks: a modified TWIGL problem and a C5G7 transient. The SDP method accurately and efficiently replicated the solution of the conventional time-dependent MOC method using two orders of magnitude less memory.« less

  4. Simultaneous image reproduction on CRT screen: Moves ultrasonic sectional view and electrocardiogram curves

    NASA Technical Reports Server (NTRS)

    1978-01-01

    A method for simultaneous reproduction of images, requiring different amounts of time to reproduce, on a cathode ray tube (CRT) screen is disclosed. Ultrasonic sectional views and electrocardiogram curves are simultaneously reproduced on the CRT screen by producing the images on different areas of a screen with two phosphors having different persistence times and luminous colors, within the times required for the appearance of the images. In front of the area on which is produced the image requiring the shorter time is a color filter which is permeable to the color of the phosphor with the shorter persistence time by which absorbs the color of the other phosphor.

  5. 7 CFR 3550.53 - Eligibility requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... available will be determined based on factors including, but not limited to: Distance, travel time... requirements. (a) Income eligibility. At the time of loan approval, the household's adjusted income must not... unless the applicant will be discharged within a reasonable period of time. (2) Because of the...

  6. Verifying Hybrid Systems Modeled as Timed Automata: A Case Study

    DTIC Science & Technology

    1997-03-01

    Introduction Researchers have proposed many innovative formal methods for developing real - time systems [9]. Such methods can give system developers and...customers greater con dence that real - time systems satisfy their requirements, especially their crit- ical requirements. However, applying formal methods...specifying and reasoning about real - time systems that is designed to address these challenging problems. Our approach is to build formal reasoning tools

  7. The solar exposure time required for vitamin D3 synthesis in the human body estimated by numerical simulation and observation in Japan.

    PubMed

    Miyauchi, Masaatsu; Hirai, Chizuko; Nakajima, Hideaki

    2013-01-01

    Although the importance of solar radiation for vitamin D3 synthesis in the human body is well known, the solar exposure time required to prevent vitamin D deficiency has not been determined in Japan. This study attempted to identify the time of solar exposure required for vitamin D3 synthesis in the body by season, time of day, and geographic location (Sapporo, Tsukuba, and Naha) using both numerical simulations and observations. According to the numerical simulation for Tsukuba at noon in July under a cloudless sky, 3.5 min of solar exposure are required to produce 5.5 μg vitamin D3 per 600 cm2 skin corresponding to the area of a face and the back of a pair of hands without ingestion from foods. In contrast, it took 76.4 min to produce the same quantity of vitamin D3 at Sapporo in December, at noon under a cloudless sky. The necessary exposure time varied considerably with the time of the day. For Tsukuba at noon in December, 22.4 min were required, but 106.0 min were required at 09:00 and 271.3 min were required at 15:00 for the same meteorological conditions. Naha receives high levels of ultraviolet radiation allowing vitamin D3 synthesis almost throughout the year.

  8. Nonlinear Localized Dissipative Structures for Long-Time Solution of Wave Equation

    DTIC Science & Technology

    2009-07-01

    are described in this chapter. These details are required to compute interference. WC can be used to generate constant arrival time ( Eikonal phase...complicated using Eikonal schemes. Some recent developments in Eikonal methods [2] can treat multiple arrival times but, these methods require extra

  9. 78 FR 54252 - Information Collection; American Recovery and Reinvestment Act-Reporting Requirements-One Time...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-03

    ... Contractors AGENCY: Department of Defense (DOD), General Services Administration (GSA), and National... Requirements for Prime Contractors. DATES: Submit comments on or before November 4, 2013. ADDRESSES: Submit... Requirements-- One Time Reporting Requirements for Prime Contractors, by any of the following methods...

  10. [Human resources requirements for diabetic patients healthcare in primary care clinics of the Mexican Institute of Social Security].

    PubMed

    Doubova, Svetlana V; Ramírez-Sánchez, Claudine; Figueroa-Lara, Alejandro; Pérez-Cuevas, Ricardo

    2013-12-01

    To estimate the requirements of human resources (HR) of two models of care for diabetes patients: conventional and specific, also called DiabetIMSS, which are provided in primary care clinics of the Mexican Institute of Social Security (IMSS). An evaluative research was conducted. An expert group identified the HR activities and time required to provide healthcare consistent with the best clinical practices for diabetic patients. HR were estimated by using the evidence-based adjusted service target approach for health workforce planning; then, comparisons between existing and estimated HRs were made. To provide healthcare in accordance with the patients' metabolic control, the conventional model required increasing the number of family doctors (1.2 times) nutritionists (4.2 times) and social workers (4.1 times). The DiabetIMSS model requires greater increase than the conventional model. Increasing HR is required to provide evidence-based healthcare to diabetes patients.

  11. Intraspecific Variation in and Environment-Dependent Resource Allocation to Embryonic Development Time in Common Terns.

    PubMed

    Vedder, Oscar; Kürten, Nathalie; Bouwhuis, Sandra

    Embryonic development time is thought to impact life histories through trade-offs against life-history traits later in life, yet the inference is based on interspecific comparative analyses only. It is largely unclear whether intraspecific variation in embryonic development time that is not caused by environmental differences occurs, which would be required to detect life-history trade-offs. Here we performed a classical common-garden experiment by incubating fresh eggs of free-living common terns (Sterna hirundo) in a controlled incubation environment at two different temperatures. Hatching success was high but was slightly lower at the lower temperature. While correcting for effects of year, incubation temperature, and laying order, we found significant variation in the incubation time embryos required until hatching and in their heart rate. Embryonic heart rate was significantly positively correlated within clutches, and a similar tendency was found for incubation time, suggesting that intrinsic differences in embryonic development rate between offspring of different parents exist. Incubation time and embryonic heart rate were strongly correlated: embryos with faster heart rates required shorter incubation time. However, after correction for heart rate, embryos still required more time for development at the lower incubation temperature. This suggests that processes other than development require a greater share of resources in a suboptimal environment and that relative resource allocation to development is, therefore, environment dependent. We conclude that there is opportunity to detect intraspecific life-history trade-offs with embryonic development time and that the resolution of trade-offs may differ between embryonic environments.

  12. A review of satellite time-transfer technology: Accomplishments and future applications

    NASA Technical Reports Server (NTRS)

    Cooper, R. S.; Chi, A. R.

    1978-01-01

    The research accomplishments by NASA in meeting the needs of the space program for precise time in satellite tracking are presented. As a major user of precise time signals for clock synchronization of NASA's worldwide satellite tracking networks, the agency provides much of the necessary impetus for the development of stable frequency sources and time synchronization technology. The precision time required for both satellite tracking and space science experiments has increased at a rate of about one order of magnitude per decade from 1 millisecond in the 1950's to 100 microseconds during the Apollo era in the 1960's to 10 microseconds in the 1970's. For the Tracking and Data Relay Satellite System, satellite timing requirements will be extended to 1 microsecond and below. These requirements are needed for spacecraft autonomy and data packeting.

  13. Direct imaging of small scatterers using reduced time dependent data

    NASA Astrophysics Data System (ADS)

    Cakoni, Fioralba; Rezac, Jacob D.

    2017-06-01

    We introduce qualitative methods for locating small objects using time dependent acoustic near field waves. These methods have reduced data collection requirements compared to typical qualitative imaging techniques. In particular, we only collect scattered field data in a small region surrounding the location from which an incident field was transmitted. The new methods are partially theoretically justified and numerical simulations demonstrate their efficacy. We show that these reduced data techniques give comparable results to methods which require full multistatic data and that these time dependent methods require less scattered field data than their time harmonic analogs.

  14. Documentation of a restart option for the U.S. Geological Survey coupled Groundwater and Surface-Water Flow (GSFLOW) model

    USGS Publications Warehouse

    Regan, R. Steve; Niswonger, Richard G.; Markstrom, Steven L.; Barlow, Paul M.

    2015-10-02

    The spin-up simulation should be run for a sufficient length of time necessary to establish antecedent conditions throughout a model domain. Each GSFLOW application can require different lengths of time to account for the hydrologic stresses to propagate through a coupled groundwater and surface-water system. Typically, groundwater hydrologic processes require many years to come into equilibrium with dynamic climate and other forcing (or stress) data, such as precipitation and well pumping, whereas runoff-dominated surface-water processes respond relatively quickly. Use of a spin-up simulation can substantially reduce execution-time requirements for applications where the time period of interest is small compared to the time for hydrologic memory; thus, use of the restart option can be an efficient strategy for forecast and calibration simulations that require multiple simulations starting from the same day.

  15. Time and Place Utility and the Requirement for Spontaneity

    ERIC Educational Resources Information Center

    Scerbinski, Jacqueline S.

    2009-01-01

    This research brief addresses the quandary that arises when distance learners require both time and place utility, and prefer live interface. The development of the hybrid course, which incorporates elements of time delayed and instantaneous interaction, is seen as a response to instructor and student scheduling conflicts. Faculty and student…

  16. 33 CFR 155.4050 - Ensuring that the salvors and marine firefighters are adequate.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... history of response times compatible with the time requirements in the regulation. (6) Resource provider... plans used and approved during real incidents. (9) Resource provider has membership in relevant national... logistical and transportation support capability required to sustain operations for extended periods of time...

  17. 33 CFR 155.4050 - Ensuring that the salvors and marine firefighters are adequate.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... history of response times compatible with the time requirements in the regulation. (6) Resource provider... plans used and approved during real incidents. (9) Resource provider has membership in relevant national... logistical and transportation support capability required to sustain operations for extended periods of time...

  18. 33 CFR 155.4050 - Ensuring that the salvors and marine firefighters are adequate.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... history of response times compatible with the time requirements in the regulation. (6) Resource provider... plans used and approved during real incidents. (9) Resource provider has membership in relevant national... logistical and transportation support capability required to sustain operations for extended periods of time...

  19. 5 CFR 550.1002 - Compensatory time off for religious observances.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 5 Administrative Personnel 1 2011-01-01 2011-01-01 false Compensatory time off for religious... personal religious beliefs require the abstention from work during certain periods of time may elect to... religious observances when the employee's personal religious beliefs require that the employee abstain from...

  20. 5 CFR 550.1002 - Compensatory time off for religious observances.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Compensatory time off for religious... personal religious beliefs require the abstention from work during certain periods of time may elect to... religious observances when the employee's personal religious beliefs require that the employee abstain from...

  1. 5 CFR 550.1002 - Compensatory time off for religious observances.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 5 Administrative Personnel 1 2012-01-01 2012-01-01 false Compensatory time off for religious... personal religious beliefs require the abstention from work during certain periods of time may elect to... religious observances when the employee's personal religious beliefs require that the employee abstain from...

  2. 5 CFR 550.1002 - Compensatory time off for religious observances.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 5 Administrative Personnel 1 2014-01-01 2014-01-01 false Compensatory time off for religious... personal religious beliefs require the abstention from work during certain periods of time may elect to... religious observances when the employee's personal religious beliefs require that the employee abstain from...

  3. 5 CFR 550.1002 - Compensatory time off for religious observances.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 5 Administrative Personnel 1 2013-01-01 2013-01-01 false Compensatory time off for religious... personal religious beliefs require the abstention from work during certain periods of time may elect to... religious observances when the employee's personal religious beliefs require that the employee abstain from...

  4. 40 CFR 270.10 - General application requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... any time after construction or operation of such facility has begun, file an application for a RCRA... hazardous waste management facility may voluntarily submit part B of the application at any time... requested part B application on time, or to furnish in full the information required by the part B...

  5. 75 FR 62486 - Flightcrew Member Duty and Rest Requirements

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-12

    ... and supplemental operations. The proposal provides different requirements based on the time of day, whether an individual is acclimated to a new time zone, and the likelihood of being able to sleep under... the existing flight crewmember regulations in the regulations governing flight and duty time for...

  6. Santa Fe Community College Part-Time Faculty Professional Development Plan.

    ERIC Educational Resources Information Center

    Santa Fe Community Coll., NM.

    Developed for faculty employed on a part-time basis at Santa Fe Community College (SFCC), this booklet explains the required and optional activities comprising the college's professional development program. Introductory sections reveal that part-time faculty members are required to participate in a number of professional development activities,…

  7. 22 CFR 1429.22 - Additional time after service by mail.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 22 Foreign Relations 2 2014-04-01 2014-04-01 false Additional time after service by mail. 1429.22 Section 1429.22 Foreign Relations FOREIGN SERVICE LABOR RELATIONS BOARD; FEDERAL LABOR RELATIONS AUTHORITY... MISCELLANEOUS AND GENERAL REQUIREMENTS General Requirements § 1429.22 Additional time after service by mail...

  8. 22 CFR 1429.22 - Additional time after service by mail.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 22 Foreign Relations 2 2011-04-01 2009-04-01 true Additional time after service by mail. 1429.22 Section 1429.22 Foreign Relations FOREIGN SERVICE LABOR RELATIONS BOARD; FEDERAL LABOR RELATIONS AUTHORITY... MISCELLANEOUS AND GENERAL REQUIREMENTS General Requirements § 1429.22 Additional time after service by mail...

  9. 22 CFR 1429.22 - Additional time after service by mail.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 22 Foreign Relations 2 2012-04-01 2009-04-01 true Additional time after service by mail. 1429.22 Section 1429.22 Foreign Relations FOREIGN SERVICE LABOR RELATIONS BOARD; FEDERAL LABOR RELATIONS AUTHORITY... MISCELLANEOUS AND GENERAL REQUIREMENTS General Requirements § 1429.22 Additional time after service by mail...

  10. 22 CFR 1429.22 - Additional time after service by mail.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 22 Foreign Relations 2 2010-04-01 2010-04-01 true Additional time after service by mail. 1429.22 Section 1429.22 Foreign Relations FOREIGN SERVICE LABOR RELATIONS BOARD; FEDERAL LABOR RELATIONS AUTHORITY... MISCELLANEOUS AND GENERAL REQUIREMENTS General Requirements § 1429.22 Additional time after service by mail...

  11. 22 CFR 1429.22 - Additional time after service by mail.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 22 Foreign Relations 2 2013-04-01 2009-04-01 true Additional time after service by mail. 1429.22 Section 1429.22 Foreign Relations FOREIGN SERVICE LABOR RELATIONS BOARD; FEDERAL LABOR RELATIONS AUTHORITY... MISCELLANEOUS AND GENERAL REQUIREMENTS General Requirements § 1429.22 Additional time after service by mail...

  12. Costs to physician offices of providing medications to medically indigent patients via pharmaceutical manufacturer prescription assistance programs.

    PubMed

    Clay, Patrick; Vaught, Eric; Glaros, Alan; Mangum, Stacy; Hansen, Daniel; Lindsey, Cameron

    2007-01-01

    Prescription assistance programs (PAPs) are offered by pharmaceutical manufacturers to provide medications at no out-of-pocket cost to various categories of medically indigent patients. some PAPs require only 1 application whereas others require as many as 4 applications per year per drug per patient, depending on the manufacturer's requirements. to measure the costs incurred by a medical clinic that provides chronic prescription medications via PAPs. this project was conducted in a free-standing, inner-city, Midwestern health clinic on the PAP application process for 1 representative drug for 32 pharmaceutical manufacturers that offered PAPs for drugs taken on a long-term basis for chronic conditions. time and motion studies were conducted using a medical assistant with the greatest amount of PAP experience. Assessment of time-to-access and time-to-complete forms was performed outside of normal clinic business hours to avoid interruptions. Personnel time costs also included receipt and delivery of drug to the patient (drug distribution time), which were assessed during normal business hours for actual medications received for 10 patients and included the time required to notify the patient of the arrival of the drug and to dispense the medication to the patient. supply costs for this PAP service included printing and copying costs. submission costs associated with mailing or faxing the documents were determined and calculated using the price of materials only. total application cost was calculated by adding the personnel time cost, supply cost, and submission cost. Annual PAP time was the time spent completing PAPs for 1 medication for 1 patient for 1 year. the time and resources required and the associated costs were aggregated separately for the pharmaceutical manufacturers that required 1, 2, or 4 applications per drug per patient per year. The total average application cost for all 32 companies was $25.18 [SD, $17.23]. Personnel time costs accounted for half or more of the total application cost, regardless of submission mode. the time to complete the form for any PAP was 0:06:20 [SD, 0:05:03] minutes with a range from 0:03:01 to 0:34:22 minutes. Printing costs were $0.20 [SD, $0.10] and copying costs were $1.96 [SD, $0.21]. Average supply costs were $2.16 [SD, $0.23]. Faxing versus mailing PAPs saved $17.90 per application. total annual clinic cost to assist patients in obtaining drugs through a PAP ranged from $10.42 per patient for a drug that requires 1 application per year (15 manufacturers, 47%) to $46.30 per patient for a drug in a PAP that requires 4 (re)applications per year (12 manufacturers, 38%). PAPs transmitted by mail required 0:49:18 [SD, 0:32:18] minutes, approximately 0:25:00 [SD, 0:21:00] minutes more than by fax (0:24:13 [SD, 0:11:32] minutes) or by Internet submissions (0:28:20 minutes), respectively. The number of PAP applications required per patient per medication annually has the greatest impact on clinic time and financial resources. Application submission method also influences the overall costs of providing this service in the clinical setting. Medical clinics should base their decision to provide a PAP application service to patients on the time and costs associated over the course of 1 year and not on the 1-time application cost.

  13. Effect of film-based versus filmless operation on the productivity of CT technologists.

    PubMed

    Reiner, B I; Siegel, E L; Hooper, F J; Glasser, D

    1998-05-01

    To determine the relative time required for a technologist to perform a computed tomographic (CT) examination in a "filmless" versus a film-based environment. Time-motion studies were performed in 204 consecutive CT examinations. Images from 96 examinations were electronically transferred to a picture archiving and communication system (PACS) without being printed to film, and 108 were printed to film. The time required to obtain and electronically transfer the images or print the images to film and make the current and previous studies available to the radiologists for interpretation was recorded. The time required for a technologist to complete a CT examination was reduced by 45% with direct image transfer to the PACS compared with the time required in the film-based mode. This reduction was due to the elimination of a number of steps in the filming process, such as the printing at multiple window or level settings. The use of a PACS can result in the elimination of multiple time-intensive tasks for the CT technologist, resulting in a marked reduction in examination time. This reduction can result in increased productivity, and, hence greater cost-effectiveness with filmless operation.

  14. Undermatching and overmatching: The fixed-ratio changeover requirement

    PubMed Central

    Pliskoff, Stanley S.; Fetterman, J. Gregor

    1981-01-01

    Concurrent variable-interval two-minute and six-minute schedules were arranged while the fixed-ratio changeover requirement was varied among one, two, and four responses. A four-response requirement produced overmatching in the response and time data. A one-response requirement produced consistent undermatching in the time data but mixed results in the response data. The two-response requirement showed undermatching in the time data and overmatching in the response data. The results are discussed in relation to previous research using changeover requirements of five and ten responses, which produced clear tendencies toward overmatching, especially with response data. Taken together, these findings suggest that matching is not a unique result, and that undermatching or overmatching can be produced by continuous variation of the changeover requirements. PMID:16812229

  15. Optimization of differentiation time of mesenchymal-stem-cell to tenocyte under a cyclic stretching with a microgrooved culture membrane and selected measurement cells.

    PubMed

    Morita, Yasuyuki; Yamashita, Takahiro; Toku, Toku; Ju, Yang

    2018-01-01

    There is a need for efficient stem cell-to-tenocyte differentiation techniques for tendon tissue engineering. More than 1 week is required for tenogenic differentiation with chemical stimuli, including co-culturing. Research has begun to examine the utility of mechanical stimuli, which reduces the differentiation time to several days. However, the precise length of time required to differentiate human bone marrow-derived mesenchymal stem cells (hBMSCs) into tenocytes has not been clarified. Understanding the precise time required is important for future tissue engineering projects. Therefore, in this study, a method was developed to more precisely determine the length of time required to differentiate hBMSCs into tenocytes with cyclic stretching stimulus. First, it had to be determined how stretching stimulation affected the cells. Microgrooved culture membranes were used to suppress cell orientation behavior. Then, only cells oriented parallel to the microgrooves were selected and evaluated for protein synthesis levels for differentiation. The results revealed that growing cells on the microgrooved membrane and selecting optimally-oriented cells for measurement improved the accuracy of the differentiation evaluation, and that hBMSCs differentiated into tenocytes in approximately 10 h. The differentiation time corresponded to the time required for cellular cytoskeleton reorganization and cellular morphology alterations. This suggests that cells, when subjected to mechanical stimulus, secrete mRNAs and proteins for both cytoskeleton reorganization and differentiation.

  16. Effect of abdominopelvic abscess drain size on drainage time and probability of occlusion

    PubMed Central

    Rotman, Jessica A.; Getrajdman, George I.; Maybody, Majid; Erinjeri, Joseph P.; Yarmohammadi, Hooman; Sofocleous, Constantinos T.; Solomon, Stephen B.; Boas, F. Edward

    2016-01-01

    Background The purpose of this study is to determine whether larger abdominopelvic abscess drains reduce the time required for abscess resolution, or the probability of tube occlusion. Methods 144 consecutive patients who underwent abscess drainage at a single institution were reviewed retrospectively. Results: Larger initial drain size did not reduce drainage time, drain occlusion, or drain exchanges (p>0.05). Subgroup analysis did not find any type of collection that benefitted from larger drains. A multivariate model predicting drainage time showed that large collections (>200 ml) required 16 days longer drainage time than small collections (<50 ml). Collections with a fistula to bowel required 17 days longer drainage time than collections without a fistula. Initial drain size and the viscosity of the fluid in the collection had no significant effect on drainage time in the multivariate model. Conclusions 8 F drains are adequate for initial drainage of most serous and serosanguineous collections. 10 F drains are adequate for initial drainage of most purulent or bloody collections. PMID:27634422

  17. QRTEngine: An easy solution for running online reaction time experiments using Qualtrics.

    PubMed

    Barnhoorn, Jonathan S; Haasnoot, Erwin; Bocanegra, Bruno R; van Steenbergen, Henk

    2015-12-01

    Performing online behavioral research is gaining increased popularity among researchers in psychological and cognitive science. However, the currently available methods for conducting online reaction time experiments are often complicated and typically require advanced technical skills. In this article, we introduce the Qualtrics Reaction Time Engine (QRTEngine), an open-source JavaScript engine that can be embedded in the online survey development environment Qualtrics. The QRTEngine can be used to easily develop browser-based online reaction time experiments with accurate timing within current browser capabilities, and it requires only minimal programming skills. After introducing the QRTEngine, we briefly discuss how to create and distribute a Stroop task. Next, we describe a study in which we investigated the timing accuracy of the engine under different processor loads using external chronometry. Finally, we show that the QRTEngine can be used to reproduce classic behavioral effects in three reaction time paradigms: a Stroop task, an attentional blink task, and a masked-priming task. These findings demonstrate that QRTEngine can be used as a tool for conducting online behavioral research even when this requires accurate stimulus presentation times.

  18. Intercontinental time and frequency transfer using a global positioning system timing receiver

    NASA Technical Reports Server (NTRS)

    Clements, P. A.

    1983-01-01

    The Deep Space Network (DSN) has a requirement to maintain knowledge of the frequency offset between DSN stations within 3 x 10 to the -13th power and time offset within 10 microseconds. It is further anticipated that in the 1987-1990 era the requirement for knowledge of time offset between DSN stations will be less than 10 nanoseconds. The Jet Propulsion Laboratory (JPL) is using the Global Positioning System (GPS) Space Vehicles, as a development project, to transfer time and frequency over intercontinental distances between stations of the DSN and between the DSN and other agencies. JPL has installed GPS timing receivers at its tracking station near Barstow, California and at its tracking station near Madrid, Spain. The details of the experiment and the data are reported. There is a discussion of the ultimate capabilities of these techniques for meeting the functional requirements of the DSN.

  19. A review of satellite time transfer technology - Accomplishments and future applications

    NASA Technical Reports Server (NTRS)

    Cooper, R. S.; Chi, A. R.

    1979-01-01

    A brief review of the research accomplishments by NASA in meeting the needs of the space program for precise time in satellite tracking is presented. As a major user of precise time signals for clock synchronization of NASA's worldwide satellite tracking networks, the agency provided much of the necessary impetus for the development of stable frequency sources and time synchronization technology. The precision in time required for both satellite tracking and space science experiments has increased at a rate of about 1 order of magnitude per decade from 1 ms in the 1950's to 100 microsec during the Apollo era in the 1960's to 10 microsec in the 1970's. In the 1980's, when the Tracking and Data Relay Satellite System (TDRSS) comes into operation, satellite timing requirements will be extended to 1 microsec and below. These requirements are needed for spacecraft autonomy and data packeting which are now in active planning stages.

  20. Time-Accurate Solutions of Incompressible Navier-Stokes Equations for Potential Turbopump Applications

    NASA Technical Reports Server (NTRS)

    Kiris, Cetin; Kwak, Dochan

    2001-01-01

    Two numerical procedures, one based on artificial compressibility method and the other pressure projection method, are outlined for obtaining time-accurate solutions of the incompressible Navier-Stokes equations. The performance of the two method are compared by obtaining unsteady solutions for the evolution of twin vortices behind a at plate. Calculated results are compared with experimental and other numerical results. For an un- steady ow which requires small physical time step, pressure projection method was found to be computationally efficient since it does not require any subiterations procedure. It was observed that the artificial compressibility method requires a fast convergence scheme at each physical time step in order to satisfy incompressibility condition. This was obtained by using a GMRES-ILU(0) solver in our computations. When a line-relaxation scheme was used, the time accuracy was degraded and time-accurate computations became very expensive.

  1. Factors Affecting Accuracy and Time Requirements of a Glucose Oxidase-Peroxidase Assay for Determination of Glucose

    USDA-ARS?s Scientific Manuscript database

    Accurate and rapid assays for glucose are desirable for analysis of glucose and starch in food and feedstuffs. An established colorimetric glucose oxidase-peroxidase method for glucose was modified to reduce analysis time, and evaluated for factors that affected accuracy. Time required to perform t...

  2. 75 FR 6663 - Notice of Public Information Collections Being Reviewed by the Federal Communications Commission...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-10

    .... Estimated Time per Response: 2 hours. Frequency of Response: On occasion reporting requirement. Obligation...,200 responses. Estimated Time per Response: 1 to 1.5 hours. Frequency of Response: On occasion... Time per Response: 2 to 5 hours. Frequency of Response: On occasion reporting requirement; Third party...

  3. 49 CFR 393.11 - Lamps and reflective devices.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., meet the applicable requirements of 49 CFR 571.108 (FMVSS No. 108) in effect at the time of manufacture..., meet the requirements of subpart B of part 393 in effect at the time of manufacture. (2) Exceptions... devices and electrical equipment in effect at the time of manufacture. Trailers which are equipped with...

  4. Restoration of STORM images from sparse subset of localizations (Conference Presentation)

    NASA Astrophysics Data System (ADS)

    Moiseev, Alexander A.; Gelikonov, Grigory V.; Gelikonov, Valentine M.

    2016-02-01

    To construct a Stochastic Optical Reconstruction Microscopy (STORM) image one should collect sufficient number of localized fluorophores to satisfy Nyquist criterion. This requirement limits time resolution of the method. In this work we propose a probabalistic approach to construct STORM images from a subset of localized fluorophores 3-4 times sparser than required from Nyquist criterion. Using a set of STORM images constructed from number of localizations sufficient for Nyquist criterion we derive a model which allows us to predict the probability for every location to be occupied by a fluorophore at the end of hypothetical acquisition, having as an input parameters distribution of already localized fluorophores in the proximity of this location. We show that probability map obtained from number of fluorophores 3-4 times less than required by Nyquist criterion may be used as superresolution image itself. Thus we are able to construct STORM image from a subset of localized fluorophores 3-4 times sparser than required from Nyquist criterion, proportionaly decreasing STORM data acquisition time. This method may be used complementary with other approaches desined for increasing STORM time resolution.

  5. Ultrasound Picture Archiving And Communication Systems

    NASA Astrophysics Data System (ADS)

    Koestner, Ken; Hottinger, C. F.

    1982-01-01

    The ideal ultrasonic image communication and storage system must be flexible in order to optimize speed and minimize storage requirements. Various ultrasonic imaging modalities are quite different in data volume and speed requirements. Static imaging, for example B-Scanning, involves acquisition of a large amount of data that is averaged or accumulated in a desired manner. The image is then frozen in image memory before transfer and storage. Images are commonly a 512 x 512 point array, each point 6 bits deep. Transfer of such an image over a serial line at 9600 baud would require about three minutes. Faster transfer times are possible; for example, we have developed a parallel image transfer system using direct memory access (DMA) that reduces the time to 16 seconds. Data in this format requires 256K bytes for storage. Data compression can be utilized to reduce these requirements. Real-time imaging has much more stringent requirements for speed and storage. The amount of actual data per frame in real-time imaging is reduced due to physical limitations on ultrasound. For example, 100 scan lines (480 points long, 6 bits deep) can be acquired during a frame at a 30 per second rate. In order to transmit and save this data at a real-time rate requires a transfer rate of 8.6 Megabaud. A real-time archiving system would be complicated by the necessity of specialized hardware to interpolate between scan lines and perform desirable greyscale manipulation on recall. Image archiving for cardiology and radiology would require data transfer at this high rate to preserve temporal (cardiology) and spatial (radiology) information.

  6. Thermal Inactivation of Aerosolized Bacillus subtilis var. niger Spores

    PubMed Central

    Mullican, Charles L.; Buchanan, Lee M.; Hoffman, Robert K.

    1971-01-01

    A hot-air sterilizer capable of exposing airborne microorganisms to elevated temperatures with an almost instantaneous heating time was developed and evaluated. With this apparatus, aerosolized Bacillus subtilis var. niger spores were killed in about 0.02 sec when exposed to temperatures above 260 C. This is about 500 times faster than killing times reported by others. Extrapolation and comparison of data on the time and temperature required to klll B. subtilis var. niger spores on surfaces show that approximately the same killing time is required as is necessary for spores in air, if corrections are made for the heating time of the surface. PMID:5002138

  7. 12 CFR 204.121 - Bankers' banks.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... time deposits. Under section 19(b)(9), however, a depository institution is not required to maintain... depository institutions; directors, officers or employees of the same or other depository institutions... required to satisfy Federal reserve requirements on all of its transaction accounts and nonpersonal time...

  8. Flow Control and Routing in an Integrated Voice and Data Communication Network

    DTIC Science & Technology

    1981-08-01

    require continuous and almost real - time delivery; they are very sensitive to delay. Data conversations, on the other hand, are generally intolerant of...packets arrive in time to be delivered to the sink. However, this is not the solution we seek. We have noted that voice conversations require almost real ...by long messages that require continuous real - time delivery; e.g. voice facsimile, video. Class II: characterized by short discrete messages that

  9. A Role for Memory in Prospective Timing informs Timing in Prospective Memory

    PubMed Central

    Waldum, Emily R; Sahakyan, Lili

    2014-01-01

    Time-based prospective memory (TBPM) tasks require the estimation of time in passing – known as prospective timing. Prospective timing is said to depend on an attentionally-driven internal clock mechanism, and is thought to be unaffected by memory for interval information (for reviews see, Block, Hancock, & Zakay, 2010; Block & Zakay, 1997). A prospective timing task that required a verbal estimate following the entire interval (Experiment 1) and a TBPM task that required production of a target response during the interval (Experiment 2) were used to test an alternative view that episodic memory does influence prospective timing. In both experiments, participants performed an ongoing lexical decision task of fixed duration while a varying number of songs were played in the background. Experiment 1 results revealed that verbal time estimates became longer the more songs participants remembered from the interval, suggesting that memory for interval information influences prospective time estimates. In Experiment 2, participants who were asked to perform the TBPM task without the aid of an external clock made their target responses earlier as the number of songs increased, indicating that prospective estimates of elapsed time increased as more songs were experienced. For participants who had access to a clock, changes in clock-checking coincided with the occurrence of song boundaries, indicating that participants used both song information and clock information to estimate time. Finally, ongoing task performance and verbal reports in both experiments further substantiate a role for episodic memory in prospective timing. PMID:22984950

  10. Multiresource allocation and scheduling for periodic soft real-time applications

    NASA Astrophysics Data System (ADS)

    Gopalan, Kartik; Chiueh, Tzi-cker

    2001-12-01

    Real-time applications that utilize multiple system resources, such as CPU, disks, and network links, require coordinated scheduling of these resources in order to meet their end-to-end performance requirements. Most state-of-the-art operating systems support independent resource allocation and deadline-driven scheduling but lack coordination among multiple heterogeneous resources. This paper describes the design and implementation of an Integrated Real-time Resource Scheduler (IRS) that performs coordinated allocation and scheduling of multiple heterogeneous resources on the same machine for periodic soft real-time application. The principal feature of IRS is a heuristic multi-resource allocation algorithm that reserves multiple resources for real-time applications in a manner that can maximize the number of applications admitted into the system in the long run. At run-time, a global scheduler dispatches the tasks of the soft real-time application to individual resource schedulers according to the precedence constraints between tasks. The individual resource schedulers, which could be any deadline based schedulers, can make scheduling decisions locally and yet collectively satisfy a real-time application's performance requirements. The tightness of overall timing guarantees is ultimately determined by the properties of individual resource schedulers. However, IRS maximizes overall system resource utilization efficiency by coordinating deadline assignment across multiple tasks in a soft real-time application.

  11. Workflow and maintenance characteristics of five automated laboratory instruments for the diagnosis of sexually transmitted infections.

    PubMed

    Ratnam, Sam; Jang, Dan; Gilchrist, Jodi; Smieja, Marek; Poirier, Andre; Hatchette, Todd; Flandin, Jean-Frederic; Chernesky, Max

    2014-07-01

    The choice of a suitable automated system for a diagnostic laboratory depends on various factors. Comparative workflow studies provide quantifiable and objective metrics to determine hands-on time during specimen handling and processing, reagent preparation, return visits and maintenance, and test turnaround time and throughput. Using objective time study techniques, workflow characteristics for processing 96 and 192 tests were determined on m2000 RealTime (Abbott Molecular), Viper XTR (Becton Dickinson), cobas 4800 (Roche Molecular Diagnostics), Tigris (Hologic Gen-Probe), and Panther (Hologic Gen-Probe) platforms using second-generation assays for Chlamydia trachomatis and Neisseria gonorrhoeae. A combination of operational and maintenance steps requiring manual labor showed that Panther had the shortest overall hands-on times and Viper XTR the longest. Both Panther and Tigris showed greater efficiency whether 96 or 192 tests were processed. Viper XTR and Panther had the shortest times to results and m2000 RealTime the longest. Sample preparation and loading time was the shortest for Panther and longest for cobas 4800. Mandatory return visits were required only for m2000 RealTime and cobas 4800 when 96 tests were processed, and both required substantially more hands-on time than the other systems due to increased numbers of return visits when 192 tests were processed. These results show that there are substantial differences in the amount of labor required to operate each system. Assay performance, instrumentation, testing capacity, workflow, maintenance, and reagent costs should be considered in choosing a system. Copyright © 2014, American Society for Microbiology. All Rights Reserved.

  12. 12 CFR 204.134 - Linked time deposits and transaction accounts.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... RESERVE SYSTEM RESERVE REQUIREMENTS OF DEPOSITORY INSTITUTIONS (REGULATION D) Interpretations § 204.134...) establishes general reserve requirements on transaction accounts and nonpersonal time deposits. Under section... other than to allow the payment of higher interest through the avoidance of reserve requirements. As the...

  13. Precise time technology for selected Air Force systems: Present status and future requirements

    NASA Technical Reports Server (NTRS)

    Yannoni, N. F.

    1981-01-01

    Precise time and time interval (PTTI) technology is becoming increasingly significant to Air Force operations as digital techniques find expanded utility in military missions. Timing has a key role in the function as well as in navigation. A survey of the PTTI needs of several Air Force systems is presented. Current technology supporting these needs was reviewed and new requirements are emphasized for systems as they transfer from initial development to final operational deployment.

  14. Critical care nursing interventions and the time required for their completion in Intensive Care Units: A Delphi study.

    PubMed

    Palomar-Aumatell, Xavier; Subirana-Casacuberta, Mireia; Mila-Villarroel, Raimon

    2017-12-01

    To determine which interventions within the Nursing Interventions Classification are most often applied in intensive care units and to validate the time required for each. A three-stage e-Delphi was conducted; 21 panelists were recruited, seven manager nurses and 14 clinical nurses with higher degrees and more than five years experience in intensive care nursing. The first round explored the most common interventions applied. Additionally, panelists were asked to propose others. In the second round, participants reflected on the interventions where no consensus was reached as well as to estimate the time required for each intervention. In the third, panelists were queried about the time required for the interventions for which consensus regarding the time was not reached. A total of 183 interventions were included; 50% of the "Physiological: Complex" domain. The list included 52 (90%) of the 58 "core interventions for critical care nursing" identified in the Nursing Interventions Classification. The time required for 89.1% of the interventions was the same as in the Nursing Interventions Classification seminal work recommendations. Results provide a clear picture of nursing activity in general intensive care units, allows to tailor the Nursing Intervetions Classification in Catalonia context and to confirm findings of previous studies. Copyright © 2017 Elsevier Ltd. All rights reserved.

  15. 40 CFR 98.34 - Monitoring and QA/QC requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... on a specified time period (e.g., week, month, quarter, or half-year), fuel sampling and analysis is required only for those time periods in which the fuel or blend is combusted. The owner or operator may.... When the sampling frequency is based on a specified time period (e.g., week, month, quarter, or half...

  16. 40 CFR 98.34 - Monitoring and QA/QC requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... on a specified time period (e.g., week, month, quarter, or half-year), fuel sampling and analysis is required only for those time periods in which the fuel or blend is combusted. The owner or operator may.... When the sampling frequency is based on a specified time period (e.g., week, month, quarter, or half...

  17. 40 CFR 98.34 - Monitoring and QA/QC requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... on a specified time period (e.g., week, month, quarter, or half-year), fuel sampling and analysis is required only for those time periods in which the fuel or blend is combusted. The owner or operator may.... When the sampling frequency is based on a specified time period (e.g., week, month, quarter, or half...

  18. 26 CFR 301.6343-1 - Requirement to release levy and notice of release.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... expedited determination, the taxpayer must submit, within the time frame specified in paragraph (c)(2) of... cases where a request for release of a levy is made within the time frame specified in paragraph (c)(2... time frame specified in paragraph (c)(2) of this section, the information required in paragraph (c)(1...

  19. 17 CFR 257.1 - General instructions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... company determines that the lapse of time has made it unlikely that it will need to prove the details... on the copy preserved may be destroyed at any time. If the same document would be required under more... preserved under § 250.26 of this chapter may be maintained and preserved for the required time by, or on...

  20. The Impact of Training on the Time Required to Implement Technology in the Classroom

    ERIC Educational Resources Information Center

    Stevens, Troy

    2014-01-01

    Many teachers are using technology to improve student achievement, but only a few are attaining an improvement in student achievement. The purpose of this quantitative study was to identify: (1) how much time teachers spend integrating technology into their classroom, (2) how much time teachers believe is required to maximize the effectiveness of…

  1. Real-time inversions for finite fault slip models and rupture geometry based on high-rate GPS data

    USGS Publications Warehouse

    Minson, Sarah E.; Murray, Jessica R.; Langbein, John O.; Gomberg, Joan S.

    2015-01-01

    We present an inversion strategy capable of using real-time high-rate GPS data to simultaneously solve for a distributed slip model and fault geometry in real time as a rupture unfolds. We employ Bayesian inference to find the optimal fault geometry and the distribution of possible slip models for that geometry using a simple analytical solution. By adopting an analytical Bayesian approach, we can solve this complex inversion problem (including calculating the uncertainties on our results) in real time. Furthermore, since the joint inversion for distributed slip and fault geometry can be computed in real time, the time required to obtain a source model of the earthquake does not depend on the computational cost. Instead, the time required is controlled by the duration of the rupture and the time required for information to propagate from the source to the receivers. We apply our modeling approach, called Bayesian Evidence-based Fault Orientation and Real-time Earthquake Slip, to the 2011 Tohoku-oki earthquake, 2003 Tokachi-oki earthquake, and a simulated Hayward fault earthquake. In all three cases, the inversion recovers the magnitude, spatial distribution of slip, and fault geometry in real time. Since our inversion relies on static offsets estimated from real-time high-rate GPS data, we also present performance tests of various approaches to estimating quasi-static offsets in real time. We find that the raw high-rate time series are the best data to use for determining the moment magnitude of the event, but slightly smoothing the raw time series helps stabilize the inversion for fault geometry.

  2. Reticles, write time, and the need for speed

    NASA Astrophysics Data System (ADS)

    Ackmann, Paul W.; Litt, Lloyd C.; Ning, Guo Xiang

    2014-10-01

    Historical data indicates reticle write times are increasing node-to-node. The cost of mask sets is increasing driven by the tighter requirements and more levels. The regular introduction of new generations of mask patterning tools with improved performance is unable to fully compensate for the increased data and complexity required. Write time is a primary metric that drives mask fabrication speed. Design (Raw data) is only the first step in the process and many interactions between mask and wafer technology such as OPC used, OPC efficiency for writers, fracture engines, and actual field size used drive total write time. Yield, technology, and inspection rules drive the remaining raw cycle time. Yield can be even more critical for speed of delivery as it drives re-writes and wasted time. While intrinsic process yield is important, repair capability is the reason mask delivery is still able to deliver 100% good reticles to the fab. Advanced nodes utilizing several layers of multiple patterning may require mask writer tool dedication to meet image placement specifications. This will increase the effective mask cycle time for a layer mask set and drive the need for additional mask write capability in order to deliver masks at the rate required by the wafer fab production schedules.

  3. Scheduling with Automatic Resolution of Conflicts

    NASA Technical Reports Server (NTRS)

    Clement, Bradley; Schaffer, Steve

    2006-01-01

    DSN Requirement Scheduler is a computer program that automatically schedules, reschedules, and resolves conflicts for allocations of resources of NASA s Deep Space Network (DSN) on the basis of ever-changing project requirements for DSN services. As used here, resources signifies, primarily, DSN antennas, ancillary equipment, and times during which they are available. Examples of project-required DSN services include arraying, segmentation, very-long-baseline interferometry, and multiple spacecraft per aperture. Requirements can include periodic reservations of specific or optional resources during specific time intervals or within ranges specified in terms of starting times and durations. This program is built on the Automated Scheduling and Planning Environment (ASPEN) software system (aspects of which have been described in previous NASA Tech Briefs articles), with customization to reflect requirements and constraints involved in allocation of DSN resources. Unlike prior DSN-resource- scheduling programs that make single passes through the requirements and require human intervention to resolve conflicts, this program makes repeated passes in a continuing search for all possible allocations, provides a best-effort solution at any time, and presents alternative solutions among which users can choose.

  4. The solar UV exposure time required for vitamin D3 synthesis in the human body estimated by numerical simulation and observation in Japan

    NASA Astrophysics Data System (ADS)

    Nakajima, Hideaki; Miyauchi, Masaatsu; Hirai, Chizuko

    2013-04-01

    After the discovery of Antarctic ozone hole, the negative effect of exposure of human body to harmful solar ultraviolet (UV) radiation is widely known. However, there is positive effect of exposure to UV radiation, i.e., vitamin D synthesis. Although the importance of solar UV radiation for vitamin D3 synthesis in the human body is well known, the solar exposure time required to prevent vitamin D deficiency has not been well determined. This study attempted to identify the time of solar exposure required for vitamin D3 synthesis in the body by season, time of day, and geographic location (Sapporo, Tsukuba, and Naha, in Japan) using both numerical simulations and observations. According to the numerical simulation for Tsukuba at noon in July under a cloudless sky, 2.3 min of solar exposure are required to produce 5.5 μg vitamin D3 per 600 cm2 skin. This quantity of vitamin D represents the recommended intake for an adult by the Ministry of Health, Labour and Welfare, and the 2010 Japanese Dietary Reference Intakes (DRIs). In contrast, it took 49.5 min to produce the same amount of vitamin D3 at Sapporo in the northern part of Japan in December, at noon under a cloudless sky. The necessary exposure time varied considerably with the time of the day. For Tsukuba at noon in December, 14.5 min were required, but at 09:00 68.7 min were required and at 15:00 175.8 min were required for the same meteorological conditions. Naha receives high levels of UV radiation allowing vitamin D3 synthesis almost throughout the year. According to our results, we are further developing an index to quantify the necessary time of UV radiation exposure to produce required amount of vitamin D3 from a UV radiation data.

  5. Next Steps in Network Time Synchronization For Navy Shipboard Applications

    DTIC Science & Technology

    2008-12-01

    40th Annual Precise Time and Time Interval (PTTI) Meeting NEXT STEPS IN NETWORK TIME SYNCHRONIZATION FOR NAVY SHIPBOARD APPLICATIONS...dynamic manner than in previous designs. This new paradigm creates significant network time synchronization challenges. The Navy has been...deploying the Network Time Protocol (NTP) in shipboard computing infrastructures to meet the current network time synchronization requirements

  6. Innovative methods for calculation of freeway travel time using limited data : executive summary report.

    DOT National Transportation Integrated Search

    2008-08-01

    ODOTs policy for Dynamic Message Sign : utilization requires travel time(s) to be displayed as : a default message. The current method of : calculating travel time involves a workstation : operator estimating the travel time based upon : observati...

  7. The calculation of viscosity of liquid n-decane and n-hexadecane by the Green-Kubo method

    NASA Astrophysics Data System (ADS)

    Cui, S. T.; Cummings, P. T.; Cochran, H. D.

    This short commentary presents the result of long molecular dynamics simulation calculations of the shear viscosity of liquid n-decane and n-hexadecane using the Green-Kubo integration method. The relaxation time of the stress-stress correlation function is compared with those of rotation and diffusion. The rotational and diffusional relaxation times, which are easy to calculate, provide useful guides for the required simulation time in viscosity calculations. Also, the computational time required for viscosity calculations of these systems by the Green-Kubo method is compared with the time required for previous non-equilibrium molecular dynamics calculations of the same systems. The method of choice for a particular calculation is determined largely by the properties of interest, since the efficiencies of the two methods are comparable for calculation of the zero strain rate viscosity.

  8. Two-dimensional Euler and Navier-Stokes Time accurate simulations of fan rotor flows

    NASA Technical Reports Server (NTRS)

    Boretti, A. A.

    1990-01-01

    Two numerical methods are presented which describe the unsteady flow field in the blade-to-blade plane of an axial fan rotor. These methods solve the compressible, time-dependent, Euler and the compressible, turbulent, time-dependent, Navier-Stokes conservation equations for mass, momentum, and energy. The Navier-Stokes equations are written in Favre-averaged form and are closed with an approximate two-equation turbulence model with low Reynolds number and compressibility effects included. The unsteady aerodynamic component is obtained by superposing inflow or outflow unsteadiness to the steady conditions through time-dependent boundary conditions. The integration in space is performed by using a finite volume scheme, and the integration in time is performed by using k-stage Runge-Kutta schemes, k = 2,5. The numerical integration algorithm allows the reduction of the computational cost of an unsteady simulation involving high frequency disturbances in both CPU time and memory requirements. Less than 200 sec of CPU time are required to advance the Euler equations in a computational grid made up of about 2000 grid during 10,000 time steps on a CRAY Y-MP computer, with a required memory of less than 0.3 megawords.

  9. Performance evaluation of time-aware enhanced software defined networking (TeSDN) for elastic data center optical interconnection.

    PubMed

    Yang, Hui; Zhang, Jie; Zhao, Yongli; Ji, Yuefeng; Li, Hui; Lin, Yi; Li, Gang; Han, Jianrui; Lee, Young; Ma, Teng

    2014-07-28

    Data center interconnection with elastic optical networks is a promising scenario to meet the high burstiness and high-bandwidth requirements of data center services. We previously implemented enhanced software defined networking over elastic optical network for data center application [Opt. Express 21, 26990 (2013)]. On the basis of it, this study extends to consider the time-aware data center service scheduling with elastic service time and service bandwidth according to the various time sensitivity requirements. A novel time-aware enhanced software defined networking (TeSDN) architecture for elastic data center optical interconnection has been proposed in this paper, by introducing a time-aware resources scheduling (TaRS) scheme. The TeSDN can accommodate the data center services with required QoS considering the time dimensionality, and enhance cross stratum optimization of application and elastic optical network stratums resources based on spectrum elasticity, application elasticity and time elasticity. The overall feasibility and efficiency of the proposed architecture is experimentally verified on our OpenFlow-based testbed. The performance of TaRS scheme under heavy traffic load scenario is also quantitatively evaluated based on TeSDN architecture in terms of blocking probability and resource occupation rate.

  10. 40 CFR 63.162 - Standards: General.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... the reports required by § 63.182 of this subpart, review of performance test results, and by... that define a period of time for completion of required tasks (e.g., weekly, monthly, quarterly, annual... section. (2) Time periods specified in this subpart for completion of required tasks may be changed by...

  11. Effect of abdominopelvic abscess drain size on drainage time and probability of occlusion.

    PubMed

    Rotman, Jessica A; Getrajdman, George I; Maybody, Majid; Erinjeri, Joseph P; Yarmohammadi, Hooman; Sofocleous, Constantinos T; Solomon, Stephen B; Boas, F Edward

    2017-04-01

    The purpose of this study is to determine whether larger abdominopelvic abscess drains reduce the time required for abscess resolution or the probability of tube occlusion. 144 consecutive patients who underwent abscess drainage at a single institution were reviewed retrospectively. Larger initial drain size did not reduce drainage time, drain occlusion, or drain exchanges (P > .05). Subgroup analysis did not find any type of collection that benefitted from larger drains. A multivariate model predicting drainage time showed that large collections (>200 mL) required 16 days longer drainage time than small collections (<50 mL). Collections with a fistula to bowel required 17 days longer drainage time than collections without a fistula. Initial drain size and the viscosity of the fluid in the collection had no significant effect on drainage time in the multivariate model. 8 F drains are adequate for initial drainage of most serous and serosanguineous collections. 10 F drains are adequate for initial drainage of most purulent or bloody collections. Copyright © 2016 Elsevier Inc. All rights reserved.

  12. 31 CFR 357.29 - Time required for processing transaction request.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Book-Entry Securities System (Legacy Treasury Direct) § 357.29 Time required for processing transaction request. For purposes of a transaction request affecting payment instructions with respect to a security...

  13. 5 CFR 610.404 - Requirement for time-accounting method.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... REGULATIONS HOURS OF DUTY Flexible and Compressed Work Schedules § 610.404 Requirement for time-accounting method. An agency that authorizes a flexible work schedule or a compressed work schedule under this...

  14. Models for forecasting hospital bed requirements in the acute sector.

    PubMed Central

    Farmer, R D; Emami, J

    1990-01-01

    STUDY OBJECTIVE--The aim was to evaluate the current approach to forecasting hospital bed requirements. DESIGN--The study was a time series and regression analysis. The time series for mean duration of stay for general surgery in the age group 15-44 years (1969-1982) was used in the evaluation of different methods of forecasting future values of mean duration of stay and its subsequent use in the formation of hospital bed requirements. RESULTS--It has been suggested that the simple trend fitting approach suffers from model specification error and imposes unjustified restrictions on the data. Time series approach (Box-Jenkins method) was shown to be a more appropriate way of modelling the data. CONCLUSION--The simple trend fitting approach is inferior to the time series approach in modelling hospital bed requirements. PMID:2277253

  15. Positioning navigation and timing service applications in cyber physical systems

    NASA Astrophysics Data System (ADS)

    Qu, Yi; Wu, Xiaojing; Zeng, Lingchuan

    2017-10-01

    The positioning navigation and timing (PNT) architecture was discussed in detail, whose history, evolvement, current status and future plan were presented, main technologies were listed, advantages and limitations of most technologies were compared, novel approaches were introduced, and future capacities were sketched. The concept of cyber-physical system (CPS) was described and their primary features were interpreted. Then the three-layer architecture of CPS was illustrated. Next CPS requirements on PNT services were analyzed, including requirements on position reference and time reference, requirements on temporal-spatial error monitor, requirements on dynamic services, real-time services, autonomous services, security services and standard services. Finally challenges faced by PNT applications in CPS were concluded. The conclusion was expected to facilitate PNT applications in CPS, and furthermore to provide references to the design and implementation of both architectures.

  16. Effects of Above Real Time Training (ARTT) On Individual Skills and Contributions to Crew/Team Performance

    NASA Technical Reports Server (NTRS)

    Ali, Syed Firasat; Khan, M. Javed; Rossi, Marcia J.; Crane, Peter; Guckenberger, Dutch; Bageon, Kellye

    2001-01-01

    Above Real Time Training (ARTT) is the training acquired on a real time simulator when it is modified to present events at a faster pace than normal. The experiments on training of pilots performed by NASA engineers and others have indicated that real time training (RTT) reinforced with ARTT would offer an effective training strategy for such tasks which require significant effort at time and workload management. A study was conducted to find how ARTT and RTT complement each other for training of novice pilot-navigator teams to fly on a required route. In the experiment, each of the participating pilot-navigator teams was required to conduct simulator flights on a prescribed two-legged ground track while maintaining required air speed and altitude. At any instant in a flight, the distance between the actual spatial point location of the airplane and the required spatial point was used as a measure of deviation from the required route. A smaller deviation represented better performance. Over a segment of flight or over complete flight, an average value of the deviation represented consolidated performance. The deviations were computed from the information on latitude, longitude, and altitude. In the combined ARTT and RTT program, ARTT at intermediate training intervals was beneficial in improving the real time performance of the trainees. It was observed that the team interaction between pilot and navigator resulted in maintaining high motivation and active participation throughout the training program.

  17. Establishing an Ultrasound Curriculum in Undergraduate Medical Education: How Much Time Does It Take?

    PubMed

    Siegel-Richman, Yonaton; Kendall, John

    2018-03-01

    Over the years, the use of ultrasound in the medical profession has become a common occurrence. As a result, many medical schools are considering an ultrasound curriculum for first- and second-year medical students. The question posed by many of these programs is how much time and effort are required to establish such a curriculum. We at the University of Colorado School of Medicine sought to quantify the resources and time required. We conducted a cohort study that analyzed the time spent teaching, as well as the types of instructors (eg, faculty, resident, and peer student) that contributed to our ultrasound curriculum. The study population consisted of instructors who participated in the curriculum during the 2014-2015 academic year. We analyzed the amount of time that facilitators spent teaching and tabulated these data using their specialty. Our data revealed that within an academic year, a combined total of 484 hours were spent teaching ultrasound to first- and second-year medical students combined. A total of 6 days were required to teach ultrasound to first-year medical students, and a total of 5 days were required for second-year medical students. It required 1 instructor for every 8 students, and most the faculty who volunteered time were from the field of emergency medicine, followed by family medicine and radiology. We describe the number of hours and instructors required to implement an ultrasound curriculum for undergraduate medical education. © 2017 by the American Institute of Ultrasound in Medicine.

  18. Factors influencing nursing time spent on administration of medication in an Australian residential aged care home.

    PubMed

    Qian, Siyu; Yu, Ping; Hailey, David M; Wang, Ning

    2016-04-01

    To examine nursing time spent on administration of medications in a residential aged care (RAC) home, and to determine factors that influence the time to medicate a resident. Information on nursing time spent on medication administration is useful for planning and implementation of nursing resources. Nurses were observed over 12 morning medication rounds using a time-motion observational method and field notes, at two high-care units in an Australian RAC home. Nurses spent between 2.5 and 4.5 hours in a medication round. Administration of medication averaged 200 seconds per resident. Four factors had significant impact on medication time: number of types of medication, number of tablets taken by a resident, methods used by a nurse to prepare tablets and methods to provide tablets. Administration of medication consumed a substantial, though variable amount of time in the RAC home. Nursing managers need to consider the factors that influenced the nursing time required for the administration of medication in their estimation of nursing workload and required resources. To ensure safe medication administration for older people, managers should regularly assess the changes in the factors influencing nursing time on the administration of medication when estimating nursing workload and required resources. © 2015 John Wiley & Sons Ltd.

  19. Divisions of geologic time-major chronostratigraphic and geochronologic units

    USGS Publications Warehouse

    ,

    2010-01-01

    Effective communication in the geosciences requires consistent uses of stratigraphic nomenclature, especially divisions of geologic time. A geologic time scale is composed of standard stratigraphic divisions based on rock sequences and is calibrated in years. Over the years, the development of new dating methods and the refinement of previous methods have stimulated revisions to geologic time scales. Advances in stratigraphy and geochronology require that any time scale be periodically updated. Therefore, Divisions of Geologic Time, which shows the major chronostratigraphic (position) and geochronologic (time) units, is intended to be a dynamic resource that will be modified to include accepted changes of unit names and boundary age estimates. This fact sheet is a modification of USGS Fact Sheet 2007-3015 by the U.S. Geological Survey Geologic Names Committee.

  20. A STUDY ON TEMPORAL DISTRIBUTION OF FREIGHT TRANSPORTATION IN CONSIDERATION OF DAILY WORK-LIFE CYCLE

    NASA Astrophysics Data System (ADS)

    Kitaoka, Daiki; Hara, Hidetaka; Oeda, Yoshinao; Sumi, Tomonori

    As advanced freight service is demanded, the time related requirements fo r freight transportation becomes more and more significant. This study, focusing on temporal distribution of freight transportation responding to the travel time, developed a shipment departure time decision model for each item, aiming at quantitatively grasping social requirement in the time domain. The model takes account of the daily work cycle of both work cy cles of shippers and carriers along with the travel time. The proposed model has a similar structure as that derived from the previous studies taking account of the daily living cycle of individuals. This model properly reproduced temporal distribution of shipment departure time that changes depending on the length of necessary lead time for each item.

  1. 12 CFR 1102.102 - Times, places and requirements for requests pertaining to individual records in a record system...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 7 2010-01-01 2010-01-01 false Times, places and requirements for requests... Individuals and Systems of Records Maintained by the Appraisal Subcommittee § 1102.102 Times, places and... individuals making requests for access to records pertaining to them. (a) Place to make request. Any request...

  2. 76 FR 26787 - Short Sale Reporting Study Required by Dodd-Frank Act Section 417(a)(2)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-09

    ... benefits and costs be if this real time reporting information were to be made public on a delayed basis..., benefits, and costs be if this real time reporting information were to be made public on a delayed basis... feasibility, benefits, and costs of requiring reporting in real time, either publicly or, in the alternative...

  3. 21 CFR 161.175 - Frozen raw breaded shrimp.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ...) Thermometer (immersion type) accurate to ±2 °F. (ix) Copper sulfate crystals (CuSo4·5H2O). (2) Procedure. (i... the exact dip time required for “debreading” the composite units in a sample. For these trials only, a... correct dip time is the minimum time of immersion in the copper sulfate solution required before the...

  4. 21 CFR 161.175 - Frozen raw breaded shrimp.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ...) Thermometer (immersion type) accurate to ±2 °F. (ix) Copper sulfate crystals (CuSo4·5H2O). (2) Procedure. (i... the exact dip time required for “debreading” the composite units in a sample. For these trials only, a... correct dip time is the minimum time of immersion in the copper sulfate solution required before the...

  5. 21 CFR 161.175 - Frozen raw breaded shrimp.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ...) Thermometer (immersion type) accurate to ±2 °F. (ix) Copper sulfate crystals (CuSo4·5H2O). (2) Procedure. (i... the exact dip time required for “debreading” the composite units in a sample. For these trials only, a... correct dip time is the minimum time of immersion in the copper sulfate solution required before the...

  6. Comparison of combinations of sighting devices and target objects for establishing circular plots in the field

    Treesearch

    Sylvio Mannel; Mark A. Rumble; Maribeth Price; Thomas M. Juntti; Dong Hua

    2006-01-01

    Many aspects of ecological research require measurement of characteristics within plots. Often, the time spent establishing plots is small relative to the time spent collecting and recording data. However, some studies require larger numbers of plots, where the time spent establishing the plot is consequential to the field effort. In open habitats, circular plots are...

  7. A security analysis of version 2 of the Network Time Protocol (NTP): A report to the privacy and security research group

    NASA Technical Reports Server (NTRS)

    Bishop, Matt

    1991-01-01

    The Network Time Protocol is being used throughout the Internet to provide an accurate time service. The security requirements are examined of such a service, version 2 of the NTP protocol is analyzed to determine how well it meets these requirements, and improvements are suggested where appropriate.

  8. Autonomous Object Characterization with Large Datasets

    DTIC Science & Technology

    2015-10-18

    desk, where a substantial amount of effort is required to transform raw photometry into a data product, minimizing the amount of time the analyst has...were used to explore concepts in satellite characterization and satellite state change. The first algorithm provides real- time stability estimation... Timely and effective space object (SO) characterization is a challenge, and requires advanced data processing techniques. Detection and identification

  9. Augmenting Conceptual Design Trajectory Tradespace Exploration with Graph Theory

    NASA Technical Reports Server (NTRS)

    Dees, Patrick D.; Zwack, Mathew R.; Steffens, Michael; Edwards, Stephen

    2016-01-01

    Within conceptual design changes occur rapidly due to a combination of uncertainty and shifting requirements. To stay relevant in this fluid time, trade studies must also be performed rapidly. In order to drive down analysis time while improving the information gained by these studies, surrogate models can be created to represent the complex output of a tool or tools within a specified tradespace. In order to create this model however, a large amount of data must be collected in a short amount of time. By this method, the historical approach of relying on subject matter experts to generate the data required is schedule infeasible. However, by implementing automation and distributed analysis the required data can be generated in a fraction of the time. Previous work focused on setting up a tool called multiPOST capable of orchestrating many simultaneous runs of an analysis tool assessing these automated analyses utilizing heuristics gleaned from the best practices of current subject matter experts. In this update to the previous work, elements of graph theory are included to further drive down analysis time by leveraging data previously gathered. It is shown to outperform the previous method in both time required, and the quantity and quality of data produced.

  10. 11 CFR 9409.12 - Procedure when a decision is not made prior to the time a response is required.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 11 Federal Elections 1 2010-01-01 2010-01-01 false Procedure when a decision is not made prior to the time a response is required. 9409.12 Section 9409.12 Federal Elections ELECTION ASSISTANCE... is required. If a response to a demand or request is required before the General Counsel's decision...

  11. 34 CFR 75.511 - Waiver of requirement for a full-time project director.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... PROGRAMS What Conditions Must Be Met by a Grantee? Project Staff § 75.511 Waiver of requirement for a full... Secretary may waive that requirement under the following conditions: (1) The project will not be adversely... 34 Education 1 2010-07-01 2010-07-01 false Waiver of requirement for a full-time project director...

  12. Development of a time sensitivity score for frequently occurring motor vehicle crash injuries.

    PubMed

    Schoell, Samantha L; Doud, Andrea N; Weaver, Ashley A; Talton, Jennifer W; Barnard, Ryan T; Martin, R Shayn; Meredith, J Wayne; Stitzel, Joel D

    2015-03-01

    Injury severity alone is a poor indicator of the time sensitivity of injuries. The purpose of the study was to quantify the urgency with which the most frequent motor vehicle crash injuries require treatment, according to expert physicians. The time sensitivity was quantified for the top 95% most frequently occurring Abbreviated Injury Scale (AIS) 2+ injuries in the National Automotive Sampling System-Crashworthiness Data System (NASS-CDS) 2000-2011. A Time Sensitivity Score was developed using expert physician survey data in which physicians were asked to determine whether a particular injury should go to a Level I/II trauma center and the urgency with which that injury required treatment. When stratifying by AIS severity, the mean Time Sensitivity Score increased with increasing AIS severity. The mean Time Sensitivity Scores by AIS severity were as follows: 0.50 (AIS 2); 0.78 (AIS 3); 0.92 (AIS 4); 0.97 (AIS 5); and 0.97 (AIS 6). When stratifying by anatomical region, the head, thorax, and abdomen were the most time sensitive. Appropriate triage depends on multiple factors, including the severity of an injury, the urgency with which it requires treatment, and the propensity of a significant injury to be missed. The Time Sensitivity Score did not correlate highly with the widely used AIS severity scores, which highlights the inability of AIS scores to capture all aspects of injury severity. The Time Sensitivity Score can be useful in Advanced Automatic Crash Notification systems for identifying highly time sensitive injuries in motor vehicle crashes requiring prompt treatment at a trauma center. Copyright © 2015 American College of Surgeons. Published by Elsevier Inc. All rights reserved.

  13. Developing a Crew Time Model for Human Exploration Missions to Mars

    NASA Technical Reports Server (NTRS)

    Battfeld, Bryan; Stromgren, Chel; Shyface, Hilary; Cirillo, William; Goodliff, Kandyce

    2015-01-01

    Candidate human missions to Mars require mission lengths that could extend beyond those that have previously been demonstrated during crewed Lunar (Apollo) and International Space Station (ISS) missions. The nature of the architectures required for deep space human exploration will likely necessitate major changes in how crews operate and maintain the spacecraft. The uncertainties associated with these shifts in mission constructs - including changes to habitation systems, transit durations, and system operations - raise concerns as to the ability of the crew to complete required overhead activities while still having time to conduct a set of robust exploration activities. This paper will present an initial assessment of crew operational requirements for human missions to the Mars surface. The presented results integrate assessments of crew habitation, system maintenance, and utilization to present a comprehensive analysis of potential crew time usage. Destination operations were assessed for a short (approx. 50 day) and long duration (approx. 500 day) surface habitation case. Crew time allocations are broken out by mission segment, and the availability of utilization opportunities was evaluated throughout the entire mission progression. To support this assessment, the integrated crew operations model (ICOM) was developed. ICOM was used to parse overhead, maintenance and system repair, and destination operations requirements within each mission segment - outbound transit, Mars surface duration, and return transit - to develop a comprehensive estimation of exploration crew time allocations. Overhead operational requirements included daily crew operations, health maintenance activities, and down time. Maintenance and repair operational allocations are derived using the Exploration Maintainability and Analysis Tool (EMAT) to develop a probabilistic estimation of crew repair time necessary to maintain systems functionality throughout the mission.

  14. Flushing Time

    EPA Science Inventory

    The flushing time of an estuary is generally defined as the turnover time of fresh water in the estuary, that is, the time required to replace the fresh water contained in the estuary with freshwater inflow. Thus, the flushing time of an estuary is the ratio of the volume of fres...

  15. 49 CFR 236.563 - Delay time.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Delay time. 236.563 Section 236.563 Transportation... Cab Signal Systems Rules and Instructions; Locomotives § 236.563 Delay time. Delay time of automatic... requirements of § 236.24 shall take into consideration the delay time. ...

  16. 49 CFR 236.563 - Delay time.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 4 2014-10-01 2014-10-01 false Delay time. 236.563 Section 236.563 Transportation... Cab Signal Systems Rules and Instructions; Locomotives § 236.563 Delay time. Delay time of automatic... requirements of § 236.24 shall take into consideration the delay time. ...

  17. 48 CFR 752.7002 - Travel and transportation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... referred to as the Standardized Regulations—as from time to time amended, for not more than the travel time...” clause of this contract, time spent away from post resulting from educational travel will be counted as... time amended, for not more than the travel time required by scheduled commercial air carrier using the...

  18. Development of an efficient computer code to solve the time-dependent Navier-Stokes equations. [for predicting viscous flow fields about lifting bodies

    NASA Technical Reports Server (NTRS)

    Harp, J. L., Jr.; Oatway, T. P.

    1975-01-01

    A research effort was conducted with the goal of reducing computer time of a Navier Stokes Computer Code for prediction of viscous flow fields about lifting bodies. A two-dimensional, time-dependent, laminar, transonic computer code (STOKES) was modified to incorporate a non-uniform timestep procedure. The non-uniform time-step requires updating of a zone only as often as required by its own stability criteria or that of its immediate neighbors. In the uniform timestep scheme each zone is updated as often as required by the least stable zone of the finite difference mesh. Because of less frequent update of program variables it was expected that the nonuniform timestep would result in a reduction of execution time by a factor of five to ten. Available funding was exhausted prior to successful demonstration of the benefits to be derived from the non-uniform time-step method.

  19. 40 CFR 63.6105 - What are my general requirements for complying with this subpart?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... to you at all times except during startup, shutdown, and malfunctions. (b) If you must comply with... times including during startup, shutdown, and malfunction. Testing and Initial Compliance Requirements ...

  20. Time as a trade barrier

    DOT National Transportation Integrated Search

    2001-07-01

    International trade occurs in physical space and moving goods requires time. This paper examines the importance of time as a trade barrier, estimates the magnitude of time costs, and relates these to patterns of trade and the international organizati...

  1. Time and Technology in Native American Indian Literature.

    ERIC Educational Resources Information Center

    Patton, Jeannie

    Understanding Native American Indian literature requires that scholars and teachers respect the cultural matrix within which the literature is written. The "ceremonial motion" of time--or "Indian time"--is a critical concept in Native American texts. When the dominant culture's time construct, linear or chronological time,…

  2. Contracted time and expanded space: The impact of circumnavigation on judgements of space and time.

    PubMed

    Brunec, Iva K; Javadi, Amir-Homayoun; Zisch, Fiona E L; Spiers, Hugo J

    2017-09-01

    The ability to estimate distance and time to spatial goals is fundamental for survival. In cases where a region of space must be navigated around to reach a location (circumnavigation), the distance along the path is greater than the straight-line Euclidean distance. To explore how such circumnavigation impacts on estimates of distance and time, we tested participants on their ability to estimate travel time and Euclidean distance to learned destinations in a virtual town. Estimates for approximately linear routes were compared with estimates for routes requiring circumnavigation. For all routes, travel times were significantly underestimated, and Euclidean distances overestimated. For routes requiring circumnavigation, travel time was further underestimated and the Euclidean distance further overestimated. Thus, circumnavigation appears to enhance existing biases in representations of travel time and distance. Copyright © 2017 The Author(s). Published by Elsevier B.V. All rights reserved.

  3. [Requirements and reality of the German ordinance for staff in psychiatric hospitals: results of a multi-moment study on a psychiatric ward for acute psychosis].

    PubMed

    Hoffmann, M; Rieger, W

    2010-11-01

    The regulation of personnel in psychiatry (PsychPV) stipulates time requirements for all relevant activities in inpatient psychiatric care as a function of the degree of disease severity of the patients treated. The demands made on employees in psychiatric care have risen substantially in recent years. Our aim was to examine whether the standard requirements of the PsychPV cover the actual work load. With the help of a multi-moment study on a general psychiatric ward we examined which activities are performed to which extent by doctors and nurses. Physicians must spend an inordinate amount of time on documentation and the nursing staff on non-patient-related tasks. The causes are the higher number of external requests and higher clinical documentation requirements. This time is lost to the direct patient contact. The PsychPV requirements must be urgently adapted so that more time is again available for the direct patient contact.

  4. 12 CFR 1403.4 - Times, places, and requirements for identification of individuals making requests.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... INSURANCE CORPORATION PRIVACY ACT REGULATIONS § 1403.4 Times, places, and requirements for identification of... the parent of a minor, or the duly appointed legal guardian of the individual to whom the record pertains. The Privacy Act Officer, however, may require such additional verification of identity in any...

  5. 12 CFR 603.315 - Times, places, and requirements for identification of individuals making requests.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... ADMINISTRATION ADMINISTRATIVE PROVISIONS PRIVACY ACT REGULATIONS § 603.315 Times, places, and requirements for... pertains, or the parent of a minor, or the duly appointed legal guardian of the individual to whom the record pertains. The Privacy Act Officer, however, may require such additional verification of identity...

  6. 12 CFR 603.315 - Times, places, and requirements for identification of individuals making requests.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... ADMINISTRATION ADMINISTRATIVE PROVISIONS PRIVACY ACT REGULATIONS § 603.315 Times, places, and requirements for... pertains, or the parent of a minor, or the duly appointed legal guardian of the individual to whom the record pertains. The Privacy Act Officer, however, may require such additional verification of identity...

  7. 12 CFR 1403.4 - Times, places, and requirements for identification of individuals making requests.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... INSURANCE CORPORATION PRIVACY ACT REGULATIONS § 1403.4 Times, places, and requirements for identification of... the parent of a minor, or the duly appointed legal guardian of the individual to whom the record pertains. The Privacy Act Officer, however, may require such additional verification of identity in any...

  8. Meeting Core Requirements through Efficient Time Management. Teaching Tips.

    ERIC Educational Resources Information Center

    Prusak, Keven

    1997-01-01

    Using a basketball unit as an example, this paper presents a model to help middle school physical educators accomplish a proper warmup, stretch, and cardiovascular workout as required by state core requirements without sacrificing time for skills acquisition and play. Concepts of individual goal setting and goal achievement are an inherent part of…

  9. 29 CFR 1620.17 - Jobs requiring equal responsibility in performance.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... in responsibility which will constitute unequal work. (b) Comparing responsibility requirements of... the higher rate to both men and women who are called upon from time to time to assume such supervisory... either a man or a woman) is authorized and required to determine whether to accept payment for purchases...

  10. 13 CFR 120.180 - Lender and CDC compliance with Loan Program Requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 13 Business Credit and Assistance 1 2014-01-01 2014-01-01 false Lender and CDC compliance with... Program Requirements § 120.180 Lender and CDC compliance with Loan Program Requirements. Lenders must... are revised from time to time. CDCs must comply and maintain familiarity with Loan Program...

  11. 13 CFR 120.180 - Lender and CDC compliance with Loan Program Requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Lender and CDC compliance with... Program Requirements § 120.180 Lender and CDC compliance with Loan Program Requirements. Lenders must... are revised from time to time. CDCs must comply and maintain familiarity with Loan Program...

  12. 13 CFR 120.180 - Lender and CDC compliance with Loan Program Requirements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 13 Business Credit and Assistance 1 2012-01-01 2012-01-01 false Lender and CDC compliance with... Program Requirements § 120.180 Lender and CDC compliance with Loan Program Requirements. Lenders must... are revised from time to time. CDCs must comply and maintain familiarity with Loan Program...

  13. 13 CFR 120.180 - Lender and CDC compliance with Loan Program Requirements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 13 Business Credit and Assistance 1 2013-01-01 2013-01-01 false Lender and CDC compliance with... Program Requirements § 120.180 Lender and CDC compliance with Loan Program Requirements. Lenders must... are revised from time to time. CDCs must comply and maintain familiarity with Loan Program...

  14. 13 CFR 120.180 - Lender and CDC compliance with Loan Program Requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 13 Business Credit and Assistance 1 2011-01-01 2011-01-01 false Lender and CDC compliance with... Program Requirements § 120.180 Lender and CDC compliance with Loan Program Requirements. Lenders must... are revised from time to time. CDCs must comply and maintain familiarity with Loan Program...

  15. 12 CFR 966.9 - Joint and several liability.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... remain in compliance with the liquidity requirements set forth in section 11(g) of the Act (12 U.S.C... statutory or regulatory liquidity requirements, or will be unable to timely and fully meet all of its... with statutory or regulatory liquidity requirements or to timely and fully meet all of its current...

  16. Scientist/AMPS equipment interface study

    NASA Technical Reports Server (NTRS)

    Anderson, H. R.

    1977-01-01

    The principal objective was to determine for each experiment how the operating procedures and modes of equipment onboard shuttle can be managed in real-time or near-real-time to enhance the quality of results. As part of this determination the data and display devices that a man will need for real-time management are defined. The secondary objectives, as listed in the RFQ and technical proposal, were to: (1) determine what quantities are to be measured (2) determine permissible background levels (3) decide in what portions of space measurements are to be made (4) estimate bit rates (5) establish time-lines for operating the experiments on a mission or set of missions and (6) determine the minimum set of hardware needed for real-time display. Experiment descriptions and requirements were written. The requirements of the various experiments are combined and a minimal set of joint requirements are defined.

  17. 29 CFR 790.5 - Effect of Portal-to-Portal Act on determination of hours worked.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... the working face to the portal of the mine, the only time spent in such travel which the employer is required to count as hours worked will be the time spent in traveling from the portal to the working face... extent stated in section 4(d). This section requires that: . . . in determining the time for which an...

  18. 13 CFR 108.1220 - Requirement for NMVC Company to file financial statements at the time of request for a draw.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... file financial statements at the time of request for a draw. 108.1220 Section 108.1220 Business Credit... Nmvc Company § 108.1220 Requirement for NMVC Company to file financial statements at the time of... financial statement on Form 468 (Short Form); and (2) File a statement of no material adverse change in your...

  19. Time process study with UML.

    PubMed

    Shiki, N; Ohno, Y; Fujii, A; Murata, T; Matsumura, Y

    2009-01-01

    We propose a new business-process analysis approach, Time Process Study (TPS), which comprises process analysis and time and motion studies (TMS). TPS offsets weaknesses of TMS; the cost of field studies and the difficulties in applying them to tasks whose time span differs from those of usual tasks. In TPS, the job procedures are first displayed using a unified modeling language (UML). Next, time and manpower for each procedure are studied through interviews and TMS, and the information is appended to the UML diagram. We applied TPS in the case of a hospital-based cancer registry (HCR) of a university hospital to clarify the work procedure and the time required, and investigated TPS's availability. Meetings for the study were held once a month from July to September in 2008, and one inquirer committed a total of eight hours to the hospital survey. TPS revealed that HCR consisted of three tasks and 14 functions. The registration required 123 hours/month/person, the quality control required 6.5 hours/ 6 months/person and filing data into the population-based cancer registry required 0.5 hours/6 months/person. Of the total tasks involved in registration, 116.5 hours/month/person were undertaken by a registration worker, which shows the necessity of employing one full-time staff. With TPS, it is straightforward to share the concept among the study-team because the job procedure is first displayed using UML. Therefore, it requires a few workload to conduct TMS and interview. The obtained results were adopted for the review of staff assignment of HCR by Japanese government.

  20. A Single Center Study of 1,179 Heart Transplant Patients-Factors Affecting Pacemaker Implantation.

    PubMed

    Wellmann, Petra; Herrmann, Florian Ernst Martin; Hagl, Christian; Juchem, Gerd

    2017-03-01

    After around 10% of heart transplant patients require pacemaker implantation. The bradyarrhythmias causing pacemaker requirement include sinus node dysfunction (SND) and atrioventricular block (AVB). This study sought to define clinical predictors for pacemaker requirement as well as identify differences in the patient groups developing SND and AVB. Our operative database was used to collect retrospective recipient, donor, and operative data of all patients receiving orthotopic heart transplants between 1981 and 2016. In the 35-year period 1,179 transplants were performed (mean recipient age 45.5 ± 0.5 years, 20.4% female, 90.6% biatrial technique) with bradyarrhythmias requiring pacemaker implantation developing in 135 patients (11.5%). Independent risk factors were prolonged operative time 340 minutes versus 313 minutes (P = 0.027) and a biatrial anastomosis (P = 0.036). Ischemia time, cardiopulmonary bypass time, aortic cross clamp time, and reperfusion time all had no significant effect on pacemaker implantation rates. Similarly, whether the transplant was a reoperation, a retransplant, or performed after primary assist implantation had no effects on pacemaker implantation rates. There was no survival difference between the paced and nonpaced groups. The donor age was higher in the patients who developed AVB as the indication for pacemaker implantation (43 vs 34 years, P = 0.031). Patients with AVB had longer aortic cross clamp times and developed the arrhythmia later than those who developed SND. Use of the bicaval instead of the biatrial technique and shortened operative times should reduce pacemaker requirement after heart transplantation. Survival is not affected by this complication. © 2017 Wiley Periodicals, Inc.

  1. 21 CFR 1020.32 - Fluoroscopic equipment.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... information as required in § 1020.30(h). (h) Fluoroscopic irradiation time, display, and signal. (1)(i... irradiation time of the fluoroscopic tube. The maximum cumulative time of the timing device shall not exceed 5... preset cumulative irradiation-time. Such signal shall continue to sound while x-rays are produced until...

  2. 21 CFR 1020.32 - Fluoroscopic equipment.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... information as required in § 1020.30(h). (h) Fluoroscopic irradiation time, display, and signal. (1)(i... irradiation time of the fluoroscopic tube. The maximum cumulative time of the timing device shall not exceed 5... preset cumulative irradiation-time. Such signal shall continue to sound while x-rays are produced until...

  3. 21 CFR 1020.32 - Fluoroscopic equipment.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... information as required in § 1020.30(h). (h) Fluoroscopic irradiation time, display, and signal. (1)(i... irradiation time of the fluoroscopic tube. The maximum cumulative time of the timing device shall not exceed 5... preset cumulative irradiation-time. Such signal shall continue to sound while x-rays are produced until...

  4. 21 CFR 1020.32 - Fluoroscopic equipment.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... information as required in § 1020.30(h). (h) Fluoroscopic irradiation time, display, and signal. (1)(i... irradiation time of the fluoroscopic tube. The maximum cumulative time of the timing device shall not exceed 5... preset cumulative irradiation-time. Such signal shall continue to sound while x-rays are produced until...

  5. 48 CFR 52.211-9 - Desired and Required Time of Delivery.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... following clause: Desired and Required Time of Delivery (JUN 1997) (a) The Government desires delivery to be... or specific periods above are based on the assumption that the Government will make award by...

  6. 48 CFR 52.211-9 - Desired and Required Time of Delivery.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... following clause: Desired and Required Time of Delivery (JUN 1997) (a) The Government desires delivery to be... or specific periods above are based on the assumption that the Government will make award by...

  7. 48 CFR 52.211-9 - Desired and Required Time of Delivery.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... following clause: Desired and Required Time of Delivery (JUN 1997) (a) The Government desires delivery to be... or specific periods above are based on the assumption that the Government will make award by...

  8. 48 CFR 52.211-9 - Desired and Required Time of Delivery.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... following clause: Desired and Required Time of Delivery (JUN 1997) (a) The Government desires delivery to be... or specific periods above are based on the assumption that the Government will make award by...

  9. 48 CFR 52.211-9 - Desired and Required Time of Delivery.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... following clause: Desired and Required Time of Delivery (JUN 1997) (a) The Government desires delivery to be... or specific periods above are based on the assumption that the Government will make award by...

  10. Optimal boarding method for airline passengers

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Steffen, Jason H.; /Fermilab

    2008-02-01

    Using a Markov Chain Monte Carlo optimization algorithm and a computer simulation, I find the passenger ordering which minimizes the time required to board the passengers onto an airplane. The model that I employ assumes that the time that a passenger requires to load his or her luggage is the dominant contribution to the time needed to completely fill the aircraft. The optimal boarding strategy may reduce the time required to board and airplane by over a factor of four and possibly more depending upon the dimensions of the aircraft. I explore some features of the optimal boarding method andmore » discuss practical modifications to the optimal. Finally, I mention some of the benefits that could come from implementing an improved passenger boarding scheme.« less

  11. The correlation between the imaging characteristics of hamstring injury and time required before returning to sports: a literature review.

    PubMed

    Svensson, Kjell; Alricsson, Marie; Eckerman, Mattias; Magounakis, Theofilos; Werner, Suzanne

    2016-06-01

    Injuries to the hamstring muscles are common in athletes. Track and field, Australian football, American football and soccer are examples of sports where hamstring injuries are the most common. The purpose of this study was to investigate whether there is a correlation between a hamstring injury prognosis and its characteristics of imaging parameters. The literature search was performed in the databases PubMed and CINAHL, and eleven articles were included. Seven out of the 11 articles showed a correlation between the size of the hamstring injury and length of time required before returning to sports. Different authors have reported contrasting results about length of time required before returning to sports due to location of injury within specific muscle. Majority of the articles found hamstring strain correlated to an extended amount of time required before returning to sports.

  12. The correlation between the imaging characteristics of hamstring injury and time required before returning to sports: a literature review

    PubMed Central

    Svensson, Kjell; Alricsson, Marie; Eckerman, Mattias; Magounakis, Theofilos; Werner, Suzanne

    2016-01-01

    Injuries to the hamstring muscles are common in athletes. Track and field, Australian football, American football and soccer are examples of sports where hamstring injuries are the most common. The purpose of this study was to investigate whether there is a correlation between a hamstring injury prognosis and its characteristics of imaging parameters. The literature search was performed in the databases PubMed and CINAHL, and eleven articles were included. Seven out of the 11 articles showed a correlation between the size of the hamstring injury and length of time required before returning to sports. Different authors have reported contrasting results about length of time required before returning to sports due to location of injury within specific muscle. Majority of the articles found hamstring strain correlated to an extended amount of time required before returning to sports. PMID:27419106

  13. Proceedings of the 14th Annual Precise Time and Time Interval (PTTI) Applications Planning Meeting

    NASA Technical Reports Server (NTRS)

    Wardrip, S. C. (Editor)

    1983-01-01

    Developments and applications in the field of frequency and time are addressed. Specific topics include rubidium frequency standards, future timing requirements, noise and atomic standards, hydrogen maser technology, synchronization, and quartz technology.

  14. PTTI 2030 - Time Transfer and Applications in 2030

    DTIC Science & Technology

    2010-01-01

    today’s society is paramount. Every day billions of people worldwide depend on some level of time synchronization , and timing laboratories require...applications as an inexpensive way to disseminate GPS-acquired time and frequency among groups, or as a backup method of time synchronization in the...strictly for timing use would be very expensive, perhaps prohibitive. ADVANTAGES OF AN IEEE-1588-ENABLED POWER GRID Time synchronization in

  15. Real-time Avatar Animation from a Single Image.

    PubMed

    Saragih, Jason M; Lucey, Simon; Cohn, Jeffrey F

    2011-01-01

    A real time facial puppetry system is presented. Compared with existing systems, the proposed method requires no special hardware, runs in real time (23 frames-per-second), and requires only a single image of the avatar and user. The user's facial expression is captured through a real-time 3D non-rigid tracking system. Expression transfer is achieved by combining a generic expression model with synthetically generated examples that better capture person specific characteristics. Performance of the system is evaluated on avatars of real people as well as masks and cartoon characters.

  16. Real-time Avatar Animation from a Single Image

    PubMed Central

    Saragih, Jason M.; Lucey, Simon; Cohn, Jeffrey F.

    2014-01-01

    A real time facial puppetry system is presented. Compared with existing systems, the proposed method requires no special hardware, runs in real time (23 frames-per-second), and requires only a single image of the avatar and user. The user’s facial expression is captured through a real-time 3D non-rigid tracking system. Expression transfer is achieved by combining a generic expression model with synthetically generated examples that better capture person specific characteristics. Performance of the system is evaluated on avatars of real people as well as masks and cartoon characters. PMID:24598812

  17. Estimation of postmortem interval based on colony development time for Anoplolepsis longipes (Hymenoptera: Formicidae).

    PubMed

    Goff, M L; Win, B H

    1997-11-01

    The postmortem interval for a set of human remains discovered inside a metal tool box was estimated using the development time required for a stratiomyid fly (Diptera: Stratiomyidae), Hermetia illucens, in combination with the time required to establish a colony of the ant Anoplolepsis longipes (Hymenoptera: Formicidae) capable of producing alate (winged) reproductives. This analysis resulted in a postmortem interval estimate of 14 + months, with a period of 14-18 months being the most probable time interval. The victim had been missing for approximately 18 months.

  18. A time-series method for automated measurement of changes in mitotic and interphase duration from time-lapse movies.

    PubMed

    Sigoillot, Frederic D; Huckins, Jeremy F; Li, Fuhai; Zhou, Xiaobo; Wong, Stephen T C; King, Randall W

    2011-01-01

    Automated time-lapse microscopy can visualize proliferation of large numbers of individual cells, enabling accurate measurement of the frequency of cell division and the duration of interphase and mitosis. However, extraction of quantitative information by manual inspection of time-lapse movies is too time-consuming to be useful for analysis of large experiments. Here we present an automated time-series approach that can measure changes in the duration of mitosis and interphase in individual cells expressing fluorescent histone 2B. The approach requires analysis of only 2 features, nuclear area and average intensity. Compared to supervised learning approaches, this method reduces processing time and does not require generation of training data sets. We demonstrate that this method is as sensitive as manual analysis in identifying small changes in interphase or mitotic duration induced by drug or siRNA treatment. This approach should facilitate automated analysis of high-throughput time-lapse data sets to identify small molecules or gene products that influence timing of cell division.

  19. Digital timing: sampling frequency, anti-aliasing filter and signal interpolation filter dependence on timing resolution.

    PubMed

    Cho, Sanghee; Grazioso, Ron; Zhang, Nan; Aykac, Mehmet; Schmand, Matthias

    2011-12-07

    The main focus of our study is to investigate how the performance of digital timing methods is affected by sampling rate, anti-aliasing and signal interpolation filters. We used the Nyquist sampling theorem to address some basic questions such as what will be the minimum sampling frequencies? How accurate will the signal interpolation be? How do we validate the timing measurements? The preferred sampling rate would be as low as possible, considering the high cost and power consumption of high-speed analog-to-digital converters. However, when the sampling rate is too low, due to the aliasing effect, some artifacts are produced in the timing resolution estimations; the shape of the timing profile is distorted and the FWHM values of the profile fluctuate as the source location changes. Anti-aliasing filters are required in this case to avoid the artifacts, but the timing is degraded as a result. When the sampling rate is marginally over the Nyquist rate, a proper signal interpolation is important. A sharp roll-off (higher order) filter is required to separate the baseband signal from its replicates to avoid the aliasing, but in return the computation will be higher. We demonstrated the analysis through a digital timing study using fast LSO scintillation crystals as used in time-of-flight PET scanners. From the study, we observed that there is no significant timing resolution degradation down to 1.3 Ghz sampling frequency, and the computation requirement for the signal interpolation is reasonably low. A so-called sliding test is proposed as a validation tool checking constant timing resolution behavior of a given timing pick-off method regardless of the source location change. Lastly, the performance comparison for several digital timing methods is also shown.

  20. Lossless data compression for improving the performance of a GPU-based beamformer.

    PubMed

    Lok, U-Wai; Fan, Gang-Wei; Li, Pai-Chi

    2015-04-01

    The powerful parallel computation ability of a graphics processing unit (GPU) makes it feasible to perform dynamic receive beamforming However, a real time GPU-based beamformer requires high data rate to transfer radio-frequency (RF) data from hardware to software memory, as well as from central processing unit (CPU) to GPU memory. There are data compression methods (e.g. Joint Photographic Experts Group (JPEG)) available for the hardware front end to reduce data size, alleviating the data transfer requirement of the hardware interface. Nevertheless, the required decoding time may even be larger than the transmission time of its original data, in turn degrading the overall performance of the GPU-based beamformer. This article proposes and implements a lossless compression-decompression algorithm, which enables in parallel compression and decompression of data. By this means, the data transfer requirement of hardware interface and the transmission time of CPU to GPU data transfers are reduced, without sacrificing image quality. In simulation results, the compression ratio reached around 1.7. The encoder design of our lossless compression approach requires low hardware resources and reasonable latency in a field programmable gate array. In addition, the transmission time of transferring data from CPU to GPU with the parallel decoding process improved by threefold, as compared with transferring original uncompressed data. These results show that our proposed lossless compression plus parallel decoder approach not only mitigate the transmission bandwidth requirement to transfer data from hardware front end to software system but also reduce the transmission time for CPU to GPU data transfer. © The Author(s) 2014.

  1. Resource utilization model for the algorithm to architecture mapping model

    NASA Technical Reports Server (NTRS)

    Stoughton, John W.; Patel, Rakesh R.

    1993-01-01

    The analytical model for resource utilization and the variable node time and conditional node model for the enhanced ATAMM model for a real-time data flow architecture are presented in this research. The Algorithm To Architecture Mapping Model, ATAMM, is a Petri net based graph theoretic model developed at Old Dominion University, and is capable of modeling the execution of large-grained algorithms on a real-time data flow architecture. Using the resource utilization model, the resource envelope may be obtained directly from a given graph and, consequently, the maximum number of required resources may be evaluated. The node timing diagram for one iteration period may be obtained using the analytical resource envelope. The variable node time model, which describes the change in resource requirement for the execution of an algorithm under node time variation, is useful to expand the applicability of the ATAMM model to heterogeneous architectures. The model also describes a method of detecting the presence of resource limited mode and its subsequent prevention. Graphs with conditional nodes are shown to be reduced to equivalent graphs with time varying nodes and, subsequently, may be analyzed using the variable node time model to determine resource requirements. Case studies are performed on three graphs for the illustration of applicability of the analytical theories.

  2. Early Discharge and Home Care After Unplanned Cesarean Birth: Nursing Care Time

    PubMed Central

    Brooten, Dorothy; Knapp, Helen; Borucki, Lynne; Jacobsen, Barbara; Finkler, Steven; Arnold, Lauren; Mennuti, Michael

    2013-01-01

    Objective This study examined the mean nursing time spent providing discharge planning and home care to women who delivered by unplanned cesarean birth and examined differences in nursing time required by women with and without morbidity. Design A secondary analysis of nursing time from a randomized trial of transitional care (discharge planning and home follow-up) provided to women after cesarean delivery. Setting An urban tertiary-care hospital. Patients The sample (N = 61) of black and white women who had unplanned cesarean births and their full-term newborns was selected randomly. Forty-four percent of the women had experienced pregnancy complications. Interventions Advanced practice nurses provided discharge planning and 8-week home follow-up consisting of home visits, telephone outreach, and daily telephone availability. Outcome Measure Nursing time required was dictated by patient need and provider judgment rather than by reimbursement plan. Results More than half of the women required more than two home visits; mean home visit time was 1 hour. For women who experienced morbidity mean discharge planning time was 20 minutes more and mean home visit time 40 minutes more. Conclusions Current health care services that provide one or two 1-hour home visits to childbearing women at high risk may not be meeting the education and resource needs of this group. PMID:8892128

  3. 5 CFR 340.202 - General.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS OTHER THAN FULL-TIME CAREER EMPLOYMENT (PART-TIME, SEASONAL, ON-CALL, AND INTERMITTENT) Regulatory Requirements-Part-Time Employment § 340.202 General. (a) Definitions. Part-time career employment means regularly scheduled work of from...

  4. Time Synchronization/Stamping Method with Visible Light Communication and Energy Harvesting Methods for Wireless Sensor Network Inside Ariane 5 Vehicle Equipment Bay

    NASA Astrophysics Data System (ADS)

    Kesuma, Hendra; Niederkleine, Kris; Schmale, Sebastian; Ahobala, Tejas; Paul, Steffen; Sebald, Johannes

    2016-08-01

    In this work we design and implement efficient time synchronization/stamping method for Wireless Sensor Network inside the Vehicle Equipment Bay (VEB) of the ARIANE 5. The sensor nodes in the network do not require real time clock (RTC) hardware to store and stamp each measurement data performed by the sensors. There will be only the measurement sequence information, previous time (clock) information, measurement data and its related data protocol information sent back to the Access Point (AP). This lead to less data transmission, less energy and less time required by the sensor nodes to operate and also leads to longer battery life time. The Visible Light Communication (VLC) is used, to provide energy, to synchronize time and to deliver the commands to the sensor nodes in the network. By employing star network topology, a part of solar cell as receiver, the conventional receiver (RF/Infrared) is neglected to reduce amount of hardware and energy consumption. The infrared transmitter on the sensor node is deployed to minimize the electromagnetic interference in the launcher and does not require a complicated circuit in comparison to a RF transmitter.

  5. Fast Determination of Distribution-Connected PV Impacts Using a Variable Time-Step Quasi-Static Time-Series Approach: Preprint

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mather, Barry

    The increasing deployment of distribution-connected photovoltaic (DPV) systems requires utilities to complete complex interconnection studies. Relatively simple interconnection study methods worked well for low penetrations of photovoltaic systems, but more complicated quasi-static time-series (QSTS) analysis is required to make better interconnection decisions as DPV penetration levels increase. Tools and methods must be developed to support this. This paper presents a variable-time-step solver for QSTS analysis that significantly shortens the computational time and effort to complete a detailed analysis of the operation of a distribution circuit with many DPV systems. Specifically, it demonstrates that the proposed variable-time-step solver can reduce themore » required computational time by as much as 84% without introducing any important errors to metrics, such as the highest and lowest voltage occurring on the feeder, number of voltage regulator tap operations, and total amount of losses realized in the distribution circuit during a 1-yr period. Further improvement in computational speed is possible with the introduction of only modest errors in these metrics, such as a 91 percent reduction with less than 5 percent error when predicting voltage regulator operations.« less

  6. Time-Dependent Parabolic Finite Difference Formulation for Harmonic Sound Propagation in a Two-Dimensional Duct with Flow

    NASA Technical Reports Server (NTRS)

    Kreider, Kevin L.; Baumeister, Kenneth J.

    1996-01-01

    An explicit finite difference real time iteration scheme is developed to study harmonic sound propagation in aircraft engine nacelles. To reduce storage requirements for future large 3D problems, the time dependent potential form of the acoustic wave equation is used. To insure that the finite difference scheme is both explicit and stable for a harmonic monochromatic sound field, a parabolic (in time) approximation is introduced to reduce the order of the governing equation. The analysis begins with a harmonic sound source radiating into a quiescent duct. This fully explicit iteration method then calculates stepwise in time to obtain the 'steady state' harmonic solutions of the acoustic field. For stability, applications of conventional impedance boundary conditions requires coupling to explicit hyperbolic difference equations at the boundary. The introduction of the time parameter eliminates the large matrix storage requirements normally associated with frequency domain solutions, and time marching attains the steady-state quickly enough to make the method favorable when compared to frequency domain methods. For validation, this transient-frequency domain method is applied to sound propagation in a 2D hard wall duct with plug flow.

  7. Gupta-Bleuler Quantization of the Maxwell Field in Globally Hyperbolic Space-Times

    NASA Astrophysics Data System (ADS)

    Finster, Felix; Strohmaier, Alexander

    2015-08-01

    We give a complete framework for the Gupta-Bleuler quantization of the free electromagnetic field on globally hyperbolic space-times. We describe one-particle structures that give rise to states satisfying the microlocal spectrum condition. The field algebras in the so-called Gupta-Bleuler representations satisfy the time-slice axiom, and the corresponding vacuum states satisfy the microlocal spectrum condition. We also give an explicit construction of ground states on ultrastatic space-times. Unlike previous constructions, our method does not require a spectral gap or the absence of zero modes. The only requirement, the absence of zero-resonance states, is shown to be stable under compact perturbations of topology and metric. Usual deformation arguments based on the time-slice axiom then lead to a construction of Gupta-Bleuler representations on a large class of globally hyperbolic space-times. As usual, the field algebra is represented on an indefinite inner product space, in which the physical states form a positive semi-definite subspace. Gauge transformations are incorporated in such a way that the field can be coupled perturbatively to a Dirac field. Our approach does not require any topological restrictions on the underlying space-time.

  8. Time-loss injuries versus non-time-loss injuries in the first team rugby league football: a pooled data analysis.

    PubMed

    Gissane, Conor; Hodgson, Lisa; Jennings, De

    2012-09-01

    To describe the injury rates in first team rugby league in terms of those injuries that require missed playing time and those that do not. A pooled data analysis from 2 independent databases. Rugby league match and training environment over several seasons from 1990 to 2003. Injuries were reported as rates per 1000 hours of participation and as percentages with their associated 95% confidence intervals (CIs). A total of 1707 match injuries were recorded. Of these injuries, 257 required players to miss the subsequent match. The remaining 1450 injuries did not require players to miss the next game. They represented 85% (95% CI, 83-87) of all injuries received and recorded. The ratio of non-time-loss (NTL) to time-loss (TL) injuries was 5.64 (95% CI, 4.96-6.42). There were 450 training injuries, of which 81 were TL injuries and 369 NTL injuries. The NTL training injury rate was 4.56 (95% CI, 3.58-5.79) times higher than TL injury rate. Non-time-loss injuries represent the largest proportion of injuries in rugby league. If NTL injuries are not recorded, the workload of practitioners is likely to be severely underestimated.

  9. SAR operational aspects

    NASA Astrophysics Data System (ADS)

    Holmdahl, P. E.; Ellis, A. B. E.; Moeller-Olsen, P.; Ringgaard, J. P.

    1981-12-01

    The basic requirements of the SAR ground segment of ERS-1 are discussed. A system configuration for the real time data acquisition station and the processing and archive facility is depicted. The functions of a typical SAR processing unit (SPU) are specified, and inputs required for near real time and full precision, deferred time processing are described. Inputs and the processing required for provision of these inputs to the SPU are dealt with. Data flow through the systems, and normal and nonnormal operational sequence, are outlined. Prerequisites for maintaining overall performance are identified, emphasizing quality control. The most demanding tasks to be performed by the front end are defined in order to determine types of processors and peripherals which comply with throughput requirements.

  10. Nonstationarity RC Workshop Report: Nonstationary Weather Patterns and Extreme Events Informing Design and Planning for Long-Lived Infrastructure

    DTIC Science & Technology

    2017-11-01

    magnitude, intensity, and seasonality of climate. For infrastructure projects, relevant design life often exceeds 30 years—a period of time of...uncertainty about future statistical properties of climate at time and spatial scales required for planning and design purposes. Information...about future statistical properties of climate at time and spatial scales required for planning and design , and for assessing future operational

  11. Wartime Automation Requirements for Maintenance.

    DTIC Science & Technology

    1982-10-01

    of training and humanitarian missions, it is difficult to distinguish between levels of conflict, which may vary due to escalation and de -escalation...the pipeline full of materiel and offset costly requisition and transportation time. The one situation which has changed today is not airbase I Rich...forecast requirements far enough ahead to allow our overtaxed transportation system enough time to move them to the right place at the right time. The

  12. Defense Communications Agency Cost and Planning Factors Manual. Revised

    DTIC Science & Technology

    1983-03-01

    the Time-Phased Fiscal Year Funding Schedule. Using estimated leadtimes required for each identifiable milestone, estimate the funding to be incurred...for each fiscal year, making sure to back off the time required for the conceptual phase, the procurement phase, and the training and operational...39-1 (To be published later) 40. FISCAL -YEAR TIME PHASING OF COST ESTIMATE ........... 40-1 (To be published later) 41. DISCOUNTING

  13. Knowledge Work, Working Time, and Use of Time among Finnish Dual-Earner Families: Does Knowledge Work Require the Marginalization of Private Life?

    ERIC Educational Resources Information Center

    Natti, Jouko; Anttila, Timo; Tammelin, Mia

    2012-01-01

    The industrial working-time regime is dissolving--not dramatically, but rather as a trend. A new trend is that those in dynamic sectors and in a good labor market position work long hours: Demanding knowledge work appears to require the marginalization of private life. This study investigates the family situation of knowledge workers, the…

  14. 26 CFR 1.401-3 - Requirements as to coverage.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... qualified unless it is part of a plan which satisfies the coverage requirements of section 401(a)(3... corporation adopts a plan at a time when it has 1,000 employees. The plan provides that all full-time.... (b) If a plan fails to qualify under the percentage requirements of section 401(a)(3)(A), it may...

  15. 26 CFR 1.401-3 - Requirements as to coverage.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... qualified unless it is part of a plan which satisfies the coverage requirements of section 401(a)(3... corporation adopts a plan at a time when it has 1,000 employees. The plan provides that all full-time.... (b) If a plan fails to qualify under the percentage requirements of section 401(a)(3)(A), it may...

  16. 26 CFR 1.401-3 - Requirements as to coverage.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... qualified unless it is part of a plan which satisfies the coverage requirements of section 401(a)(3... corporation adopts a plan at a time when it has 1,000 employees. The plan provides that all full-time.... (b) If a plan fails to qualify under the percentage requirements of section 401(a)(3)(A), it may...

  17. 26 CFR 1.401-3 - Requirements as to coverage.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... qualified unless it is part of a plan which satisfies the coverage requirements of section 401(a)(3... corporation adopts a plan at a time when it has 1,000 employees. The plan provides that all full-time.... (b) If a plan fails to qualify under the percentage requirements of section 401(a)(3)(A), it may...

  18. 76 FR 73494 - Airworthiness Directives; Turbomeca S.A. Arriel 2B Turboshaft Engines

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-29

    ... identified in the MCAI. The one-time functional test required by the service bulletin is not a normal engine run-up test: the one-time functional test involves additional requirements including mode switching, that are not part of a normal engine run-up after start. FAA's Determination and Requirements of This...

  19. Survival distributions impact the power of randomized placebo-phase design and parallel groups randomized clinical trials.

    PubMed

    Abrahamyan, Lusine; Li, Chuan Silvia; Beyene, Joseph; Willan, Andrew R; Feldman, Brian M

    2011-03-01

    The study evaluated the power of the randomized placebo-phase design (RPPD)-a new design of randomized clinical trials (RCTs), compared with the traditional parallel groups design, assuming various response time distributions. In the RPPD, at some point, all subjects receive the experimental therapy, and the exposure to placebo is for only a short fixed period of time. For the study, an object-oriented simulation program was written in R. The power of the simulated trials was evaluated using six scenarios, where the treatment response times followed the exponential, Weibull, or lognormal distributions. The median response time was assumed to be 355 days for the placebo and 42 days for the experimental drug. Based on the simulation results, the sample size requirements to achieve the same level of power were different under different response time to treatment distributions. The scenario where the response times followed the exponential distribution had the highest sample size requirement. In most scenarios, the parallel groups RCT had higher power compared with the RPPD. The sample size requirement varies depending on the underlying hazard distribution. The RPPD requires more subjects to achieve a similar power to the parallel groups design. Copyright © 2011 Elsevier Inc. All rights reserved.

  20. 17 CFR 23.205 - Real-time public reporting.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 17 Commodity and Securities Exchanges 1 2013-04-01 2013-04-01 false Real-time public reporting. 23... Swap Dealers and Major Swap Participants § 23.205 Real-time public reporting. (a) Real-time public... information and swap transaction and pricing data required to be reported in accordance with the real-time...

  1. 17 CFR 23.205 - Real-time public reporting.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 17 Commodity and Securities Exchanges 1 2014-04-01 2014-04-01 false Real-time public reporting. 23... Swap Dealers and Major Swap Participants § 23.205 Real-time public reporting. (a) Real-time public... information and swap transaction and pricing data required to be reported in accordance with the real-time...

  2. 5 CFR 550.1404 - Creditable travel time.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 5 Administrative Personnel 1 2012-01-01 2012-01-01 false Creditable travel time. 550.1404 Section... ADMINISTRATION (GENERAL) Compensatory Time Off for Travel § 550.1404 Creditable travel time. (a) General. Subject... off for time in a travel status if— (1) The employee is required to travel away from the official duty...

  3. 5 CFR 550.1404 - Creditable travel time.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 5 Administrative Personnel 1 2014-01-01 2014-01-01 false Creditable travel time. 550.1404 Section... ADMINISTRATION (GENERAL) Compensatory Time Off for Travel § 550.1404 Creditable travel time. (a) General. Subject... off for time in a travel status if— (1) The employee is required to travel away from the official duty...

  4. 5 CFR 550.1404 - Creditable travel time.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 5 Administrative Personnel 1 2013-01-01 2013-01-01 false Creditable travel time. 550.1404 Section... ADMINISTRATION (GENERAL) Compensatory Time Off for Travel § 550.1404 Creditable travel time. (a) General. Subject... off for time in a travel status if— (1) The employee is required to travel away from the official duty...

  5. 5 CFR 550.1404 - Creditable travel time.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 5 Administrative Personnel 1 2011-01-01 2011-01-01 false Creditable travel time. 550.1404 Section... ADMINISTRATION (GENERAL) Compensatory Time Off for Travel § 550.1404 Creditable travel time. (a) General. Subject... off for time in a travel status if— (1) The employee is required to travel away from the official duty...

  6. 5 CFR 550.1404 - Creditable travel time.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Creditable travel time. 550.1404 Section... ADMINISTRATION (GENERAL) Compensatory Time Off for Travel § 550.1404 Creditable travel time. (a) General. Subject... off for time in a travel status if— (1) The employee is required to travel away from the official duty...

  7. 49 CFR 71.2 - Annual advancement of standard time.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 71.2 Transportation Office of the Secretary of Transportation STANDARD TIME ZONE BOUNDARIES § 71.2.... This advanced time shall be the standard time of each zone during such period. The Act authorizes any State to exempt itself from this requirement. States in two or more time zones may exempt the...

  8. 49 CFR 71.2 - Annual advancement of standard time.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., requires that the standard time of each State observing Daylight Saving Time shall be advanced 1 hour... 49 Transportation 1 2012-10-01 2012-10-01 false Annual advancement of standard time. 71.2 Section 71.2 Transportation Office of the Secretary of Transportation STANDARD TIME ZONE BOUNDARIES § 71.2...

  9. 49 CFR 71.2 - Annual advancement of standard time.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., requires that the standard time of each State observing Daylight Saving Time shall be advanced 1 hour... 49 Transportation 1 2014-10-01 2014-10-01 false Annual advancement of standard time. 71.2 Section 71.2 Transportation Office of the Secretary of Transportation STANDARD TIME ZONE BOUNDARIES § 71.2...

  10. 49 CFR 71.2 - Annual advancement of standard time.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., requires that the standard time of each State observing Daylight Saving Time shall be advanced 1 hour... 49 Transportation 1 2013-10-01 2013-10-01 false Annual advancement of standard time. 71.2 Section 71.2 Transportation Office of the Secretary of Transportation STANDARD TIME ZONE BOUNDARIES § 71.2...

  11. 49 CFR 71.2 - Annual advancement of standard time.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., requires that the standard time of each State observing Daylight Saving Time shall be advanced 1 hour... 49 Transportation 1 2011-10-01 2011-10-01 false Annual advancement of standard time. 71.2 Section 71.2 Transportation Office of the Secretary of Transportation STANDARD TIME ZONE BOUNDARIES § 71.2...

  12. 76 FR 44305 - Honey From Argentina: Extension of Time Limit for Preliminary Results of Antidumping Duty New...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-25

    ...: Extension of Time Limit for Preliminary Results of Antidumping Duty New Shipper Review AGENCY: Import... results of this review is July 24, 2011. Extension of Time Limits for Preliminary Results of Review... time to complete the preliminary results. Specifically, the Department requires additional time to...

  13. 29 CFR 553.226 - Training time.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 3 2010-07-01 2010-07-01 false Training time. 553.226 Section 553.226 Labor Regulations... time. (a) The general rules for determining the compensability of training time under the FLSA are set forth in §§ 785.27 through 785.32 of this title. (b) While time spent in attending training required by...

  14. 29 CFR 553.226 - Training time.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 3 2012-07-01 2012-07-01 false Training time. 553.226 Section 553.226 Labor Regulations... time. (a) The general rules for determining the compensability of training time under the FLSA are set forth in §§ 785.27 through 785.32 of this title. (b) While time spent in attending training required by...

  15. 29 CFR 553.226 - Training time.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 3 2014-07-01 2014-07-01 false Training time. 553.226 Section 553.226 Labor Regulations... time. (a) The general rules for determining the compensability of training time under the FLSA are set forth in §§ 785.27 through 785.32 of this title. (b) While time spent in attending training required by...

  16. 77 FR 42040 - Self-Regulatory Organizations; Chicago Board Options Exchange, Incorporated; Notice of Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-17

    ... comparable to the obligations proposed in this filing: Market-Makers % Time % Series Classes CBOE (current........ 60 All classes collectively. PMMs % Time % Series Classes CBOE (current rule) 99% of the time... % Time % Series Classes CBOE (current rule) 99% of the time required to 90% * Class-by-class. provide...

  17. Coherent diffractive imaging of time-evolving samples with improved temporal resolution

    DOE PAGES

    Ulvestad, A.; Tripathi, A.; Hruszkewycz, S. O.; ...

    2016-05-19

    Bragg coherent x-ray diffractive imaging is a powerful technique for investigating dynamic nanoscale processes in nanoparticles immersed in reactive, realistic environments. Its temporal resolution is limited, however, by the oversampling requirements of three-dimensional phase retrieval. Here, we show that incorporating the entire measurement time series, which is typically a continuous physical process, into phase retrieval allows the oversampling requirement at each time step to be reduced, leading to a subsequent improvement in the temporal resolution by a factor of 2-20 times. The increased time resolution will allow imaging of faster dynamics and of radiation-dose-sensitive samples. Furthermore, this approach, which wemore » call "chrono CDI," may find use in improving the time resolution in other imaging techniques.« less

  18. 5 CFR 340.203 - Technical assistance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... expanding career part-time employment opportunities. This assistance shall include but not be limited to: (1) Help in developing part-time career employment programs; (2) Information on public and private sector...-TIME CAREER EMPLOYMENT (PART-TIME, SEASONAL, ON-CALL, AND INTERMITTENT) Regulatory Requirements-Part...

  19. 76 FR 42536 - Real-Time System Management Information Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-19

    ...-Time System Management Information Program AGENCY: Federal Highway Administration (FHWA), DOT. ACTION... Real-Time System Management Information Program and general information about current and planned... establishing requirements for the Real-Time System Management Information Program on November 8, 2010, at 75 FR...

  20. Agglomeration Multigrid for an Unstructured-Grid Flow Solver

    NASA Technical Reports Server (NTRS)

    Frink, Neal; Pandya, Mohagna J.

    2004-01-01

    An agglomeration multigrid scheme has been implemented into the sequential version of the NASA code USM3Dns, tetrahedral cell-centered finite volume Euler/Navier-Stokes flow solver. Efficiency and robustness of the multigrid-enhanced flow solver have been assessed for three configurations assuming an inviscid flow and one configuration assuming a viscous fully turbulent flow. The inviscid studies include a transonic flow over the ONERA M6 wing and a generic business jet with flow-through nacelles and a low subsonic flow over a high-lift trapezoidal wing. The viscous case includes a fully turbulent flow over the RAE 2822 rectangular wing. The multigrid solutions converged with 12%-33% of the Central Processing Unit (CPU) time required by the solutions obtained without multigrid. For all of the inviscid cases, multigrid in conjunction with an explicit time-stepping scheme performed the best with regard to the run time memory and CPU time requirements. However, for the viscous case multigrid had to be used with an implicit backward Euler time-stepping scheme that increased the run time memory requirement by 22% as compared to the run made without multigrid.

  1. "The Prognosis, Doctor?"

    ERIC Educational Resources Information Center

    Everhart, Nancy

    1998-01-01

    Updates a 1994 report on school library staffing, highlighting states with the best and worst student/librarian ratios, states requiring full-time certified library media specialists, states with site-based management, states replacing librarians with technology specialists. Lists states requiring full-time specialists for elementary,…

  2. 17 CFR 240.12b-25 - Notification of inability to timely file all or any required portion of a Form 10-K, 20-F, 11-K...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... timely file all or any required portion of a Form 10-K, 20-F, 11-K, N-SAR, N-CSR, 10-Q, or 10-D. 240.12b... timely file all or any required portion of a Form 10-K, 20-F, 11-K, N-SAR, N-CSR, 10-Q, or 10-D. (a) If..., annual or transition report on Form N-CSR (17 CFR 249.331; 17 CFR 274.128) or Form N-SAR (17 CFR 249.330...

  3. 17 CFR 240.12b-25 - Notification of inability to timely file all or any required portion of a Form 10-K, 20-F, 11-K...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... timely file all or any required portion of a Form 10-K, 20-F, 11-K, N-SAR, N-CSR, 10-Q, or 10-D. 240.12b... timely file all or any required portion of a Form 10-K, 20-F, 11-K, N-SAR, N-CSR, 10-Q, or 10-D. (a) If..., annual or transition report on Form N-CSR (17 CFR 249.331; 17 CFR 274.128) or Form N-SAR (17 CFR 249.330...

  4. 17 CFR 240.12b-25 - Notification of inability to timely file all or any required portion of a Form 10-K, 20-F, 11-K...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... timely file all or any required portion of a Form 10-K, 20-F, 11-K, N-SAR, N-CSR, 10-Q, or 10-D. 240.12b... timely file all or any required portion of a Form 10-K, 20-F, 11-K, N-SAR, N-CSR, 10-Q, or 10-D. (a) If..., annual or transition report on Form N-CSR (17 CFR 249.331; 17 CFR 274.128) or Form N-SAR (17 CFR 249.330...

  5. 17 CFR 240.12b-25 - Notification of inability to timely file all or any required portion of a Form 10-K, 20-F, 11-K...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... timely file all or any required portion of a Form 10-K, 20-F, 11-K, N-SAR, N-CSR, 10-Q, or 10-D. 240.12b... timely file all or any required portion of a Form 10-K, 20-F, 11-K, N-SAR, N-CSR, 10-Q, or 10-D. (a) If..., annual or transition report on Form N-CSR (17 CFR 249.331; 17 CFR 274.128) or Form N-SAR (17 CFR 249.330...

  6. 17 CFR 240.12b-25 - Notification of inability to timely file all or any required portion of a Form 10-K, 20-F, 11-K...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... timely file all or any required portion of a Form 10-K, 20-F, 11-K, N-SAR, N-CSR, 10-Q, or 10-D. 240.12b... timely file all or any required portion of a Form 10-K, 20-F, 11-K, N-SAR, N-CSR, 10-Q, or 10-D. (a) If..., annual or transition report on Form N-CSR (17 CFR 249.331; 17 CFR 274.128) or Form N-SAR (17 CFR 249.330...

  7. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Smallwood, D.O.

    In a previous paper Smallwood and Paez (1991) showed how to generate realizations of partially coherent stationary normal time histories with a specified cross-spectral density matrix. This procedure is generalized for the case of multiple inputs with a specified cross-spectral density function and a specified marginal probability density function (pdf) for each of the inputs. The specified pdfs are not required to be Gaussian. A zero memory nonlinear (ZMNL) function is developed for each input to transform a Gaussian or normal time history into a time history with a specified non-Gaussian distribution. The transformation functions have the property that amore » transformed time history will have nearly the same auto spectral density as the original time history. A vector of Gaussian time histories are then generated with the specified cross-spectral density matrix. These waveforms are then transformed into the required time history realizations using the ZMNL function.« less

  8. Work measurement for estimating food preparation time of a bioregenerative diet

    NASA Technical Reports Server (NTRS)

    Olabi, Ammar; Hunter, Jean; Jackson, Peter; Segal, Michele; Spies, Rupert; Wang, Carolyn; Lau, Christina; Ong, Christopher; Alexander, Conor; Raskob, Evan; hide

    2003-01-01

    During space missions, such as the prospective Mars mission, crew labor time is a strictly limited resource. The diet for such a mission (based on crops grown in a bioregenerative life support system) will require astronauts to prepare their meals essentially from raw ingredients. Time spent on food processing and preparation is time lost for other purposes. Recipe design and diet planning for a space mission should therefore incorporate the time required to prepare the recipes as a critical factor. In this study, videotape analysis of an experienced chef was used to develop a database of recipe preparation time. The measurements were highly consistent among different measurement teams. Data analysis revealed a wide variation between the active times of different recipes, underscoring the need for optimization of diet planning. Potential uses of the database developed in this study are discussed and illustrated in this work.

  9. The Association of State Law to Physical Education Time Allocation in US Public Schools

    PubMed Central

    Oh, April; Chriqui, Jamie F.; Mâsse, Louise C.; Atienza, Audie A.; Nebeling, Linda; Agurs-Collins, Tanya; Moser, Richard P.; Dodd, Kevin W.

    2012-01-01

    Objectives. We examined whether public schools in states with specific and stringent physical education (PE) laws, as assessed by the Physical Education–Related State Policy Classification System (PERSPCS), available on the Classification of Laws Associated with School Students (C.L.A.S.S.) Web site, reported more weekly PE time in the most recent School Health Policies and Programs Survey (SHPPS). Methods. Schools (n = 410) were grouped by their state’s PERSPCS time requirement scores (none, nonspecific requirement, or specific requirement). Average weekly school-level PE was calculated using the SHPPS-reported PE minutes. Weighted analyses determined if PE minutes/week differed by PERSPCS group. Results. Schools in states with specific requirement laws averaged over 27 and 60 more PE minutes/week at the elementary and middle school levels, respectively, compared with schools within states with nonspecific laws and over 40 and 60 more PE minutes per week, respectively, compared with elementary and middle schools in states with no laws. High school results were nonsignificant. Conclusions. Public health guidelines recommend at least 60 minutes of daily physical activity for children, and PE may further this goal. Strong codified law with specific time requirements for PE may be an important tool contributing toward adequate PE time and daily physical activity recommendations. PMID:22594746

  10. Methods of determining complete sensor requirements for autonomous mobility

    NASA Technical Reports Server (NTRS)

    Curtis, Steven A. (Inventor)

    2012-01-01

    A method of determining complete sensor requirements for autonomous mobility of an autonomous system includes computing a time variation of each behavior of a set of behaviors of the autonomous system, determining mobility sensitivity to each behavior of the autonomous system, and computing a change in mobility based upon the mobility sensitivity to each behavior and the time variation of each behavior. The method further includes determining the complete sensor requirements of the autonomous system through analysis of the relative magnitude of the change in mobility, the mobility sensitivity to each behavior, and the time variation of each behavior, wherein the relative magnitude of the change in mobility, the mobility sensitivity to each behavior, and the time variation of each behavior are characteristic of the stability of the autonomous system.

  11. Real-time dynamics simulation of the Cassini spacecraft using DARTS. Part 1: Functional capabilities and the spatial algebra algorithm

    NASA Technical Reports Server (NTRS)

    Jain, A.; Man, G. K.

    1993-01-01

    This paper describes the Dynamics Algorithms for Real-Time Simulation (DARTS) real-time hardware-in-the-loop dynamics simulator for the National Aeronautics and Space Administration's Cassini spacecraft. The spacecraft model consists of a central flexible body with a number of articulated rigid-body appendages. The demanding performance requirements from the spacecraft control system require the use of a high fidelity simulator for control system design and testing. The DARTS algorithm provides a new algorithmic and hardware approach to the solution of this hardware-in-the-loop simulation problem. It is based upon the efficient spatial algebra dynamics for flexible multibody systems. A parallel and vectorized version of this algorithm is implemented on a low-cost, multiprocessor computer to meet the simulation timing requirements.

  12. Evaluation of the advantageous anesthetic properties of dexmedetomidine used as hypotensive agent compared with nitroglycerin in orthognathic surgery.

    PubMed

    Rummasak, Duangdee; Apipan, Benjamas

    2014-12-01

    To evaluate the advantageous anesthetic properties, such as the decrease of intraoperative analgesic requirement, time to extubation and recovery, and early postoperative pain, of dexmedetomidine used as hypotensive agent compared with nitroglycerin in orthognathic surgery. The authors implemented a prospective, single-blinded, randomized clinical trial. The sample was composed of healthy patients who were admitted for bimaxillary osteotomies and were assigned to 1 of 2 groups by a computer-generated random number and blinded to the group. Dexmedetomidine or nitroglycerin was used as the hypotensive drug for each group. All patients underwent hypotensive anesthesia and surgery according to standard protocol. Intraoperative amount of fentanyl, time to eye opening, time to follow basic verbal commands, time to extubation, early postoperative pain scores, and analgesics were recorded. Compared means were analyzed using the unpaired Student t test. A 2-sided statistical test was used. A P value less than .05 was considered significant. The sample was composed of 40 participants. The intraoperative fentanyl requirement was significantly lower in the dexmedetomidine group than in the nitroglycerin group (168.75±56.29 and 222.50±96.12 μg, respectively; P=.037). Times to eye opening and following commands were considerably longer in the dexmedetomidine group, but the time to extubation showed no meaningful difference. Early postoperative pain after 30 and 60 minutes and the requirement for meperidine were not meaningfully different between the 2 groups. Dexmedetomidine, used as a hypotensive drug, has anesthetic benefits compared with nitroglycerin. Dexmedetomidine decreases the intraoperative fentanyl requirement and does not meaningfully change the time to extubation, early postoperative pain, and analgesic drug requirement. Copyright © 2014 American Association of Oral and Maxillofacial Surgeons. Published by Elsevier Inc. All rights reserved.

  13. Experimental investigation of drying characteristics of cornelian cherry fruits ( Cornus mas L.)

    NASA Astrophysics Data System (ADS)

    Ozgen, Filiz

    2015-03-01

    Major target of present paper is to investigate the drying kinetics of cornelian cherry fruits ( Cornus mas L.) in a convective dryer, by varying the temperature and the velocity of drying air. Freshly harvested fruits are dried at drying air temperature of 35, 45 and 55 °C. The considered drying air velocities are V air = 1 and 1.5 m/s for each temperature. The required drying time is determined by taking into consideration the moisture ratio measurements. When the moisture ratio reaches up to 10 % at the selected drying air temperature, then the time is determined ( t = 40-67 h). The moisture ratio, fruit temperature and energy requirement are presented as the functions of drying time. The lowest drying time (40 h) is obtained when the air temperature is 55 °C and air velocity is 1.5 m/s. The highest drying time (67 h) is found under the conditions of 35 °C temperature and 1 m/s velocity. Both the drying air temperature and the air velocity significantly affect the required energy for drying system. The minimum amount of required energy is found as 51.12 kWh, at 55 °C and 1 m/s, whilst the maximum energy requirement is 106.7 kWh, at 35 °C and 1.5 m/s. It is also found that, air temperature significantly influences the total drying time. Moreover, the energy consumption is decreasing with increasing air temperature. The effects of three parameters (air temperature, air velocity and drying time) on drying characteristics have also been analysed by means of analysis of variance method to show the effecting levels. The experimental results have a good agreement with the predicted ones.

  14. Cognitive performance in women with fibromyalgia: A case-control study.

    PubMed

    Pérez de Heredia-Torres, Marta; Huertas-Hoyas, Elisabet; Máximo-Bocanegra, Nuria; Palacios-Ceña, Domingo; Fernández-De-Las-Peñas, César

    2016-10-01

    This study aimed to evaluate the differences in cognitive skills between women with fibromyalgia and healthy women, and the correlations between functional independence and cognitive limitations. A cross-sectional study was performed. Twenty women with fibromyalgia and 20 matched controls participated. Outcomes included the Numerical Pain Rating Scale, the Functional Independence Measure, the Fibromyalgia Impact Questionnaire and Gradior © software. The Student's t-test and the Spearman's rho test were applied to the data. Women affected required a greater mean time (P < 0.020) and maximum time (P < 0.015) during the attention test than the healthy controls. In the memory test they displayed greater execution errors (P < 0.001), minimal time (P < 0.001) and mean time (P < 0.001) whereas, in the perception tests, they displayed a greater mean time (P < 0.009) and maximum time (P < 0.048). Correlations were found between the domains of the functional independence measure and the cognitive abilities assessed. Women with fibromyalgia exhibited a decreased cognitive ability compared to healthy controls, which negatively affected the performance of daily activities, such as upper limb dressing, feeding and personal hygiene. Patients required more time to perform activities requiring both attention and perception, decreasing their functional independence. Also, they displayed greater errors when performing activities requiring the use of memory. Occupational therapists treating women with fibromyalgia should consider the negative impact of possible cognitive deficits on the performance of daily activities and offer targeted support strategies. © 2016 Occupational Therapy Australia.

  15. Some Calculations for the RHIC Kicker

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Claus, J.

    1996-12-01

    The bunches that arrive from the AGS are put on to RHIC's median plane by a string of four injection kickers in each ring. There are four short kickers rather than one long one in order to keep the kicker filling time acceptable, filling time being defined as the amount of time needed for increasing the deflecting field in the kicker from zero to its nominal value. During the filling time process the energy stored in the deflecting field is moved from outside the kicker to its aperture; since energy can only be displaced with finite velocity the filling timemore » is non-zero for kickers of non-zero length, and tends to increase with increasing length. It is one of the more important parameters of the kicker because it sets a lower limit to the time interval between the last of the already circulating bunches and the newly injected one, and thus an upper limit to the total number of bunches that can be injected. RF gymnastics can be used to pack the bunches tighter than is indicated by this limit, but such gymnastics required radial aperture beyond what would be required otherwise, as well as time, and probably special hardware. Minimization of the kicker's stored energy requires minimization of its aperture, it presents therefore a major aperture restriction. Unless it is placed at a point where the dispersion is negligible its aperture would have to be increased in order to provide the radial space needed for the gymnastics. Both the amount of extra space needed and the rate of longitudinal displacement increase with the maximum deviation in energy of the bunch to be displaced from the nominal value, thus taking more time for the exercise reduces the aperture requirements. This time is measured in terms of synchrotron periods and is not small. It adds directly to the filling time of each ring and decreases therefore the time-average luminosity. Evidently the maximation of the time-average luminosity is a complex issue in which the kicker filling time is a major parameter.« less

  16. Scheduling Dependent Real-Time Activities

    DTIC Science & Technology

    1990-08-01

    dependency relationships in a way that is suitable for all real - time systems . This thesis provides an algorithm, called DASA, that is effective for...scheduling the class of real - time systems known as supervisory control systems. Simulation experiments that account for the time required to make scheduling

  17. GPS-UTC Time Synchronization

    DTIC Science & Technology

    1989-11-01

    GPS-UTC TIME SYNCHRONIZATION C. H. MCKENZIE W. A. FEESS R, H. LUCAS H. HOLTZ A. L. SATIN The Aerospace Corporation El Segundo, California...Abstract Two automatic algorithms for synchronizing the GPS time standard to the UTC time standard are evaluated. Both algorithms control GPS-UTC...is required to synchronize its broadcast time standard to within one microsecond o f the time standard maintained by the US Naval Observatory

  18. Qibla Finder and Sholat Times Based on Digital Compass, GPS and Microprocessor

    NASA Astrophysics Data System (ADS)

    Sanjaya, W. S. M.; Anggraeni, D.; Nurrahman, F. I.; Kresnadjaja, W. G.; Dewi, I. P.; Mira; Aliah, H.; Marlina, L.

    2018-01-01

    To performing Sholat, Muslims around the world are required to pay attention to the requirements of Sholat, such as; determining the direction of the Qibla (Kaaba) and the time of Sholat. In this research will be made a real time Qibla Finder and Sholat Times named Q-Bot Ver3 to help Muslims find a Qibla direction and Time of Sholat anywhere. This Qibla Finder and Sholat Times are developed with robotic technology based on Digital Compass, GPS and Microcontroller. To determine the Qibla direction and Sholat times, latitude and longitude data form GPS module processed used spherical triangle trigonometry method, while the compass module used to show the Qibla direction. Moreover, this system has a buzzer which can sound if the device facing to the Qibla. This system is reliable and accurate in determining the Qibla Finder and Sholat Times. Thus, the advantage of the system is can correct the Qibla of Masjid and can help blind people to facing Qibla around the world.

  19. Ultrafast detection in particle physics and positron emission tomography using SiPMs

    NASA Astrophysics Data System (ADS)

    Dolenec, R.; Korpar, S.; Križan, P.; Pestotnik, R.

    2017-12-01

    Silicon photomultiplier (SiPM) photodetectors perform well in many particle and medical physics applications, especially where good efficiency, insensitivity to magnetic field and precise timing are required. In Cherenkov time-of-flight positron emission tomography the requirements for photodetector performance are especially high. On average only a couple of photons are available for detection and the best possible timing resolution is needed. Using SiPMs as photodetectors enables good detection efficiency, but the large sensitive area devices needed have somewhat limited time resolution for single photons. We have observed an additional degradation of the timing at very low light intensities due to delayed events in distribution of signals resulting from multiple fired micro cells. In this work we present the timing properties of AdvanSiD ASD-NUV3S-P-40 SiPM at single photon level picosecond laser illumination and a simple modification of the time-walk correction algorithm, that resulted in reduced degradation of timing resolution due to the delayed events.

  20. Beam-modulation methods in quantitative and flow visualization holographic interferometry

    NASA Technical Reports Server (NTRS)

    Decker, A.

    1986-01-01

    This report discusses heterodyne holographic interferometry and time-average holography with a frequency shifted reference beam. Both methods will be used for the measurement and visualization of internal transonic flows, where the target facility is a flutter cascade. The background and experimental requirements for both methods are reviewed. Measurements using heterodyne holographic interferometry are presented. The performance of the laser required for time-average holography of time-varying transonic flows is discussed.

  1. Beam-modulation methods in quantitative and flow-visualization holographic interferometry

    NASA Technical Reports Server (NTRS)

    Decker, Arthur J.

    1986-01-01

    Heterodyne holographic interferometry and time-average holography with a frequency shifted reference beam are discussed. Both methods will be used for the measurement and visualization of internal transonic flows where the target facility is a flutter cascade. The background and experimental requirements for both methods are reviewed. Measurements using heterodyne holographic interferometry are presented. The performance of the laser required for time-average holography of time-varying transonic flows is discussed.

  2. Micromechanical Disk Array for Enhanced Frequency Stability Against Bias Voltage Fluctuations

    DTIC Science & Technology

    2014-11-20

    already made inroads into the low-end timing market , and research devices have been reported to satisfy GSM phase noise requirements while only...resonators have already made inroads into the low-end timing market , and research devices have been reported to satisfy GSM phase noise requirements...Notably oscillators referenced to very high Q capacitive-gap transduced MEMS resonators have already made inroads into the low-end timing market , and

  3. An investigation of several numerical procedures for time-asymptotic compressible Navier-Stokes solutions

    NASA Technical Reports Server (NTRS)

    Rudy, D. H.; Morris, D. J.; Blanchard, D. K.; Cooke, C. H.; Rubin, S. G.

    1975-01-01

    The status of an investigation of four numerical techniques for the time-dependent compressible Navier-Stokes equations is presented. Results for free shear layer calculations in the Reynolds number range from 1000 to 81000 indicate that a sequential alternating-direction implicit (ADI) finite-difference procedure requires longer computing times to reach steady state than a low-storage hopscotch finite-difference procedure. A finite-element method with cubic approximating functions was found to require excessive computer storage and computation times. A fourth method, an alternating-direction cubic spline technique which is still being tested, is also described.

  4. Choosing the Most Effective Pattern Classification Model under Learning-Time Constraint.

    PubMed

    Saito, Priscila T M; Nakamura, Rodrigo Y M; Amorim, Willian P; Papa, João P; de Rezende, Pedro J; Falcão, Alexandre X

    2015-01-01

    Nowadays, large datasets are common and demand faster and more effective pattern analysis techniques. However, methodologies to compare classifiers usually do not take into account the learning-time constraints required by applications. This work presents a methodology to compare classifiers with respect to their ability to learn from classification errors on a large learning set, within a given time limit. Faster techniques may acquire more training samples, but only when they are more effective will they achieve higher performance on unseen testing sets. We demonstrate this result using several techniques, multiple datasets, and typical learning-time limits required by applications.

  5. Work, Leisure Time and Adult Education in Technically Advanced Industrial Countries.

    ERIC Educational Resources Information Center

    European Centre for Leisure and Education, Prague (Czechoslovakia).

    An outline of the increasing amount of change required of modern man, specifically in Czechoslovakia, to cope with the demands of a rapidly advancing technology is presented. Consideration is given to leisure time, work requirements, and educational needs. (CK)

  6. Payload software technology: Software technology development plan

    NASA Technical Reports Server (NTRS)

    1977-01-01

    Programmatic requirements for the advancement of software technology are identified for meeting the space flight requirements in the 1980 to 1990 time period. The development items are described, and software technology item derivation worksheets are presented along with the cost/time/priority assessments.

  7. 46 CFR 35.01-50 - Special operating requirements for tank barges carrying certain dangerous bulk cargoes-B/ALL.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... certain dangerous bulk cargoes-B/ALL. 35.01-50 Section 35.01-50 Shipping COAST GUARD, DEPARTMENT OF... requirements for tank barges carrying certain dangerous bulk cargoes—B/ALL. (a) The requirements of this... times. (f) During the time the cargo tanks contain dangerous cargoes described in paragraph (a) of this...

  8. 46 CFR 35.01-50 - Special operating requirements for tank barges carrying certain dangerous bulk cargoes-B/ALL.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... certain dangerous bulk cargoes-B/ALL. 35.01-50 Section 35.01-50 Shipping COAST GUARD, DEPARTMENT OF... requirements for tank barges carrying certain dangerous bulk cargoes—B/ALL. (a) The requirements of this... times. (f) During the time the cargo tanks contain dangerous cargoes described in paragraph (a) of this...

  9. 9 CFR 3.104 - Space requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... required minimum horizontal dimension (MHD) of a pool for Group I cetaceans shall be 7.32 meters (24.0 feet... area requirements are met based on an MHD of 7.32 meters (24.0 feet) or two times the average adult... maturity. (ii) The MHD of a pool for Group II cetaceans shall be 7.32 meters (24.0 feet) or four times the...

  10. 26 CFR 301.6110-5 - Notice and time requirements; actions to restrain disclosure; actions to obtain additional...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ...) any third-party communication notations required to be placed pursuant to § 301.6110-4(a) on the face... a written determination on which a third-party communication notation has been placed pursuant to... 26 Internal Revenue 18 2010-04-01 2010-04-01 false Notice and time requirements; actions to...

  11. All the Stereotypes Confirmed: Differences in How Australian Boys and Girls Use Their Time

    ERIC Educational Resources Information Center

    Ferrar, Katia E.; Olds, Tim S.; Walters, Julie L.

    2012-01-01

    Background: To influence adolescent health, a greater understanding of time use and covariates such as gender is required. Purpose: To explore gender-specific time use patterns in Australian adolescents using high-resolution time use data. Method: This study analyzed 24-hour recall time use data collected as part of the 2007 Australian National…

  12. Internalizing versus Externalizing Control: Different Ways to Perform a Time-Based Prospective Memory Task

    ERIC Educational Resources Information Center

    Huang, Tracy; Loft, Shayne; Humphreys, Michael S.

    2014-01-01

    "Time-based prospective memory" (PM) refers to performing intended actions at a future time. Participants with time-based PM tasks can be slower to perform ongoing tasks (costs) than participants without PM tasks because internal control is required to maintain the PM intention or to make prospective-timing estimates. However, external…

  13. Correlations of circulating peptide YY and ghrelin with body weight, rate of weight gain, and time required to achieve the recommended daily intake in preterm infants.

    PubMed

    Chen, XiaFang; Du, XueLiang; Zhu, JianXing; Xie, LiJuan; Zhang, YongJun; He, ZhenJuan

    2012-07-01

    The objective was to elucidate the relationships between serum concentrations of the gut hormone peptide YY (PYY) and ghrelin and growth development in infants for potential application to the clinical observation index. Serum concentrations of PYY and ghrelin were measured using radioimmunoassay from samples collected at the clinic. For each patient, gestational age, birth weight, time required to return to birth weight, rate of weight gain, time required to achieve recommended daily intake (RDI) standards, time required for full-gastric feeding, duration of hospitalization, and time of administration of total parenteral nutrition were recorded. Serum PYY and ghrelin concentrations were significantly higher in the preterm group (N = 20) than in the full-term group (N = 20; P < 0.01). Within the preterm infant group, the serum concentrations of PYY and ghrelin on postnatal day (PND) 7 (ghrelin = 1485.38 ± 409.24; PYY = 812.37 ± 153.77 ng/L) were significantly higher than on PND 1 (ghrelin = 956.85 ± 223.09; PYY = 545.27 ± 204.51 ng/L) or PND 3 (ghrelin = 1108.44 ± 351.36; PYY = 628.96 ± 235.63 ng/L; P < 0.01). Both serum PYY and ghrelin concentrations were negatively correlated with body weight, and the degree of correlation varied with age. Serum ghrelin concentration correlated negatively with birth weight and positively with the time required to achieve RDI (P < 0.05). In conclusion, serum PYY and ghrelin concentrations reflect a negative energy balance, predict postnatal growth, and enable compensation. Further studies are required to elucidate the precise concentration and roles of PYY and ghrelin in newborns and to determine the usefulness of measuring these hormones in clinical practice.

  14. Correlations of circulating peptide YY and ghrelin with body weight, rate of weight gain, and time required to achieve the recommended daily intake in preterm infants

    PubMed Central

    Chen, XiaFang; Du, Xueliang; Zhu, JianXing; Xie, LiJuan; Zhang, YongJun; He, ZhenJuan

    2012-01-01

    The objective was to elucidate the relationships between serum concentrations of the gut hormone peptide YY (PYY) and ghrelin and growth development in infants for potential application to the clinical observation index. Serum concentrations of PYY and ghrelin were measured using radioimmunoassay from samples collected at the clinic. For each patient, gestational age, birth weight, time required to return to birth weight, rate of weight gain, time required to achieve recommended daily intake (RDI) standards, time required for full-gastric feeding, duration of hospitalization, and time of administration of total parenteral nutrition were recorded. Serum PYY and ghrelin concentrations were significantly higher in the preterm group (N = 20) than in the full-term group (N = 20; P < 0.01). Within the preterm infant group, the serum concentrations of PYY and ghrelin on postnatal day (PND) 7 (ghrelin = 1485.38 ± 409.24; PYY = 812.37 ± 153.77 ng/L) were significantly higher than on PND 1 (ghrelin = 956.85 ± 223.09; PYY = 545.27 ± 204.51 ng/L) or PND 3 (ghrelin = 1108.44 ± 351.36; PYY = 628.96 ± 235.63 ng/L; P < 0.01). Both serum PYY and ghrelin concentrations were negatively correlated with body weight, and the degree of correlation varied with age. Serum ghrelin concentration correlated negatively with birth weight and positively with the time required to achieve RDI (P < 0.05). In conclusion, serum PYY and ghrelin concentrations reflect a negative energy balance, predict postnatal growth, and enable compensation. Further studies are required to elucidate the precise concentration and roles of PYY and ghrelin in newborns and to determine the usefulness of measuring these hormones in clinical practice. PMID:22527125

  15. Time to aortic occlusion: It's all about access.

    PubMed

    Romagnoli, Anna; Teeter, William; Pasley, Jason; Hu, Peter; Hoehn, Melanie; Stein, Deborah; Scalea, Thomas; Brenner, Megan

    2017-12-01

    Resuscitative endovascular balloon occlusion of the aorta (REBOA) is a less invasive method of proximal aortic occlusion compared with resuscitative thoracotomy with aortic cross-clamping (RTACC). This study compared time to aortic occlusion with REBOA and RTACC, both including and excluding time required for common femoral artery (CFA) cannulation. This was a retrospective, single-institution review of REBOA or RTACC performed between February 2013 and January 2016. Time of skin incision to aortic cross-clamp for RTACC, time required for CFA cannulation by percutaneous and open methods, and time from guide-wire insertion to balloon inflation at Zone 1 for REBOA, were obtained from videographic recordings. Eighteen RTACC and 21 REBOAs were performed. Median (Q1, Q3) time from skin incision to aortic cross-clamping was 317 seconds (227, 551 seconds). Median (Q1, Q3) time from start of arterial access to Zone 1 balloon occlusion was 474 seconds (431, 572 seconds) (vs. RTACC, p = 0.01). All REBOA procedures were performed with the same device. The median time to complete CFA cannulation was 247 seconds (range, 164-343 seconds), with no difference between percutaneous or open procedures (p = 0.07). The median (Q1, Q3) time to aortic occlusion in REBOA once arterial access had been established was 245 seconds (179, 295.5 seconds), which was significantly shorter than RTACC (p = 0.003). Once CFA access is achieved, time to aortic occlusion is faster with REBOA. Time to aortic occlusion is less than the time required to cannulate the CFA either by percutaneous or open approaches, emphasizing the importance of accurate and expedient CFA access. Resuscitative endovascular balloon occlusion of the aorta may represent a feasible alternative to thoracotomy for aortic occlusion. Time to aortic occlusion will likely decrease with the advent of newer REBOA technology. The rate-limiting portion of REBOA continues to be obtaining CFA access. Therapeutic, level V.

  16. The Poynting-Robertson effect in the Newtonian potential with a Yukawa correction

    NASA Astrophysics Data System (ADS)

    Haranas, Ioannis; Ragos, Omiros; Gkigkitzis, Ioannis; Kotsireas, Ilias; Martz, Connor; Van Middekoop, Sheldon

    2018-01-01

    We consider a Yukawa-type gravitational potential combined with the Poynting-Robertson effect. Dust particles originating within the asteroid belt and moving on circular and elliptic trajectories are studied and expressions for the time rate of change of their orbital radii and semimajor axes, respectively, are obtained. These expressions are written in terms of basic particle parameters, namely their density and diameter. Then, they are applied to produce expressions for the time required by the dust particles to reach the orbit of Earth. For the Yukawa gravitational potential, dust particles of diameter 10^{ - 3} m in circular orbits require times of the order of 8.557 × 106 yr and for elliptic orbits of eccentricities e =0.1, 0.5 require times of 9.396 × 106 and 2.129 × 106 yr respectively to reach Earth's orbit. Finally, various cases of the Yukawa potential are studied and the corresponding particle times to reach Earth's are derived per case along with numerical results for circular and various elliptical orbits.

  17. Development of a semi-automated model identification and calibration tool for conceptual modelling of sewer systems.

    PubMed

    Wolfs, Vincent; Villazon, Mauricio Florencio; Willems, Patrick

    2013-01-01

    Applications such as real-time control, uncertainty analysis and optimization require an extensive number of model iterations. Full hydrodynamic sewer models are not sufficient for these applications due to the excessive computation time. Simplifications are consequently required. A lumped conceptual modelling approach results in a much faster calculation. The process of identifying and calibrating the conceptual model structure could, however, be time-consuming. Moreover, many conceptual models lack accuracy, or do not account for backwater effects. To overcome these problems, a modelling methodology was developed which is suited for semi-automatic calibration. The methodology is tested for the sewer system of the city of Geel in the Grote Nete river basin in Belgium, using both synthetic design storm events and long time series of rainfall input. A MATLAB/Simulink(®) tool was developed to guide the modeller through the step-wise model construction, reducing significantly the time required for the conceptual modelling process.

  18. Lower Limits on Aperture Size for an ExoEarth Detecting Coronagraphic Mission

    NASA Technical Reports Server (NTRS)

    Stark, Christopher C.; Roberge, Aki; Mandell, Avi; Clampin, Mark; Domagal-Goldman, Shawn D.; McElwain, Michael W.; Stapelfeldt, Karl R.

    2015-01-01

    The yield of Earth-like planets will likely be a primary science metric for future space-based missions that will drive telescope aperture size. Maximizing the exoEarth candidate yield is therefore critical to minimizing the required aperture. Here we describe a method for exoEarth candidate yield maximization that simultaneously optimizes, for the first time, the targets chosen for observation, the number of visits to each target, the delay time between visits, and the exposure time of every observation. This code calculates both the detection time and multiwavelength spectral characterization time required for planets. We also refine the astrophysical assumptions used as inputs to these calculations, relying on published estimates of planetary occurrence rates as well as theoretical and observational constraints on terrestrial planet sizes and classical habitable zones. Given these astrophysical assumptions, optimistic telescope and instrument assumptions, and our new completeness code that produces the highest yields to date, we suggest lower limits on the aperture size required to detect and characterize a statistically motivated sample of exoEarths.

  19. 14 CFR 121.511 - Flight time limitations: Flight engineers: airplanes.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Flight time limitations: Flight engineers... OPERATING REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Flight Time Limitations: Supplemental Operations § 121.511 Flight time limitations: Flight engineers: airplanes. (a) In any operation in which one...

  20. 14 CFR 121.511 - Flight time limitations: Flight engineers: airplanes.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Flight time limitations: Flight engineers... OPERATING REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Flight Time Limitations: Supplemental Operations § 121.511 Flight time limitations: Flight engineers: airplanes. (a) In any operation in which one...

  1. 14 CFR 121.511 - Flight time limitations: Flight engineers: airplanes.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Flight time limitations: Flight engineers... OPERATING REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Flight Time Limitations: Supplemental Operations § 121.511 Flight time limitations: Flight engineers: airplanes. (a) In any operation in which one...

  2. 14 CFR 121.511 - Flight time limitations: Flight engineers: airplanes.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Flight time limitations: Flight engineers... OPERATING REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Flight Time Limitations: Supplemental Operations § 121.511 Flight time limitations: Flight engineers: airplanes. (a) In any operation in which one...

  3. 77 FR 65016 - NASA Federal Advisory Committees

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-24

    ... are not full-time positions. Successful nominees will be required to attend meetings of the subcommittee approximately two to four times a year, either in person (NASA covers travel-related expenses for.... NASA's science advisory subcommittees have member vacancies from time to time throughout the year, and...

  4. A two-dimensional time domain near zone to far zone transformation

    NASA Technical Reports Server (NTRS)

    Luebbers, Raymond J.; Ryan, Deirdre; Beggs, John H.; Kunz, Karl S.

    1991-01-01

    A time domain transformation useful for extrapolating three dimensional near zone finite difference time domain (FDTD) results to the far zone was presented. Here, the corresponding two dimensional transform is outlined. While the three dimensional transformation produced a physically observable far zone time domain field, this is not convenient to do directly in two dimensions, since a convolution would be required. However, a representative two dimensional far zone time domain result can be obtained directly. This result can then be transformed to the frequency domain using a Fast Fourier Transform, corrected with a simple multiplicative factor, and used, for example, to calculate the complex wideband scattering width of a target. If an actual time domain far zone result is required, it can be obtained by inverse Fourier transform of the final frequency domain result.

  5. A two-dimensional time domain near zone to far zone transformation

    NASA Technical Reports Server (NTRS)

    Luebbers, Raymond J.; Ryan, Deirdre; Beggs, John H.; Kunz, Karl S.

    1991-01-01

    In a previous paper, a time domain transformation useful for extrapolating 3-D near zone finite difference time domain (FDTD) results to the far zone was presented. In this paper, the corresponding 2-D transform is outlined. While the 3-D transformation produced a physically observable far zone time domain field, this is not convenient to do directly in 2-D, since a convolution would be required. However, a representative 2-D far zone time domain result can be obtained directly. This result can then be transformed to the frequency domain using a Fast Fourier Transform, corrected with a simple multiplicative factor, and used, for example, to calculate the complex wideband scattering width of a target. If an actual time domain far zone result is required it can be obtained by inverse Fourier transform of the final frequency domain result.

  6. A stretch/compress scheme for a high temporal resolution detector for the magnetic recoil spectrometer time (MRSt)

    DOE PAGES

    Hilsabeck, T. J.; Frenje, J. A.; Hares, J. D.; ...

    2016-08-02

    Here we present a time-resolved detector concept for the magnetic recoil spectrometer for time-resolved measurements of the NIF neutron spectrum. The measurement is challenging due to the time spreading of the recoil protons (or deuterons) as they transit an energy dispersing magnet system. Ions arrive at the focal plane of the magnetic spectrometer over an interval of tens of nanoseconds. We seek to measure the time-resolved neutron spectrum with 20 ps precision by manipulating an electron signal derived from the ions. A stretch-compress scheme is employed to remove transit time skewing while simultaneously reducing the bandwidth requirements for signal recording.more » Simulation results are presented along with design concepts for structures capable of establishing the required electromagnetic fields.« less

  7. A stretch/compress scheme for a high temporal resolution detector for the magnetic recoil spectrometer time (MRSt)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hilsabeck, T. J.; Frenje, J. A.; Hares, J. D.

    Here we present a time-resolved detector concept for the magnetic recoil spectrometer for time-resolved measurements of the NIF neutron spectrum. The measurement is challenging due to the time spreading of the recoil protons (or deuterons) as they transit an energy dispersing magnet system. Ions arrive at the focal plane of the magnetic spectrometer over an interval of tens of nanoseconds. We seek to measure the time-resolved neutron spectrum with 20 ps precision by manipulating an electron signal derived from the ions. A stretch-compress scheme is employed to remove transit time skewing while simultaneously reducing the bandwidth requirements for signal recording.more » Simulation results are presented along with design concepts for structures capable of establishing the required electromagnetic fields.« less

  8. Light-weight Parallel Python Tools for Earth System Modeling Workflows

    NASA Astrophysics Data System (ADS)

    Mickelson, S. A.; Paul, K.; Xu, H.; Dennis, J.; Brown, D. I.

    2015-12-01

    With the growth in computing power over the last 30 years, earth system modeling codes have become increasingly data-intensive. As an example, it is expected that the data required for the next Intergovernmental Panel on Climate Change (IPCC) Assessment Report (AR6) will increase by more than 10x to an expected 25PB per climate model. Faced with this daunting challenge, developers of the Community Earth System Model (CESM) have chosen to change the format of their data for long-term storage from time-slice to time-series, in order to reduce the required download bandwidth needed for later analysis and post-processing by climate scientists. Hence, efficient tools are required to (1) perform the transformation of the data from time-slice to time-series format and to (2) compute climatology statistics, needed for many diagnostic computations, on the resulting time-series data. To address the first of these two challenges, we have developed a parallel Python tool for converting time-slice model output to time-series format. To address the second of these challenges, we have developed a parallel Python tool to perform fast time-averaging of time-series data. These tools are designed to be light-weight, be easy to install, have very few dependencies, and can be easily inserted into the Earth system modeling workflow with negligible disruption. In this work, we present the motivation, approach, and testing results of these two light-weight parallel Python tools, as well as our plans for future research and development.

  9. A time motion study in the immunization clinic of a tertiary care hospital of kolkata, west bengal.

    PubMed

    Chattopadhyay, Amitabha; Ghosh, Ritu; Maji, Sucharita; Ray, Tapobroto Guha; Lahiri, Saibendu Kumar

    2012-01-01

    A time and motion study is used to determine the amount of time required for a specific activity, work function, or mechanical process. Few such studies have been reported in the outpatient department of institutions, and such studies based exclusively on immunization clinic of an institute is a rarity. This was an observational cross sectional study done in the immunization clinic of R.G. Kar Medical College, Kolkata, over a period of 1 month (September 2010). The study population included mother/caregivers attending the immunization clinics with their children. The total sample was 482. Pre-synchronized stopwatches were used to record service delivery time at the different activity points. Median time was the same for both initial registration table and nutrition and health education table (120 seconds), but the vaccination and post vaccination advice table took the highest percentage of overall time (46.3%). Maximum time spent on the vaccination and post vaccination advice table was on Monday (538.1 s) and nutritional assessment and health assessment table took maximum time on Friday (217.1 s). Time taken in the first half of immunization session was more in most of the tables. The goal for achieving universal immunization against vaccine-preventable diseases requires multifaceted collated response from many stakeholders. Efficient functioning of immunization clinics is therefore required to achieve the prescribed goals. This study aims to initiate an effort to study the utilization of time at a certain health care unit with the invitation of much more in depth analysis in future.

  10. 75 FR 17918 - Submission for OMB Review; American Recovery and Reinvestment Act-One-Time Reporting Requirements...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-08

    ... DEPARTMENT OF DEFENSE GENERAL SERVICES ADMINISTRATION NATIONAL AERONAUTICS AND SPACE... Recovery and Reinvestment Act--One-Time Reporting Requirements for First-Tier Subcontractors AGENCY: Department of Defense (DOD), General Services Administration (GSA), and National Aeronautics and Space...

  11. 75 FR 22805 - Submission for OMB Review; American Recovery and Reinvestment Act-One-Time Reporting Requirements...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-30

    ... DEPARTMENT OF DEFENSE GENERAL SERVICES ADMINISTRATION NATIONAL AERONAUTICS AND SPACE... Recovery and Reinvestment Act--One-Time Reporting Requirements for First-Tier Subcontractors AGENCIES: Department of Defense (DoD), General Services Administration (GSA), and National Aeronautics and Space...

  12. Fat content and D-Value, A tale of two finfish

    USDA-ARS?s Scientific Manuscript database

    In the National Advisory Committee on Microbiological Criteria for Food (NACMCF) report, it was determined that the cooking process (time/temperature) requirement for seafood would be different than for meat products. NACMCF identified a need to determine the time/temperature requirements to adequ...

  13. 27 CFR 30.21 - Requirements.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... thermometers furnished by the Government. However, where this part requires the use of a specific gravity hydrometer, TTB officers shall use precision grade specific gravity hydrometers conforming to the provisions... determination of specific gravity and for gauging. From time to time appropriate TTB officers shall verify the...

  14. 27 CFR 30.21 - Requirements.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... thermometers furnished by the Government. However, where this part requires the use of a specific gravity hydrometer, TTB officers shall use precision grade specific gravity hydrometers conforming to the provisions... determination of specific gravity and for gauging. From time to time appropriate TTB officers shall verify the...

  15. 27 CFR 30.21 - Requirements.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... thermometers furnished by the Government. However, where this part requires the use of a specific gravity hydrometer, TTB officers shall use precision grade specific gravity hydrometers conforming to the provisions... determination of specific gravity and for gauging. From time to time appropriate TTB officers shall verify the...

  16. 27 CFR 30.21 - Requirements.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... thermometers furnished by the Government. However, where this part requires the use of a specific gravity hydrometer, TTB officers shall use precision grade specific gravity hydrometers conforming to the provisions... determination of specific gravity and for gauging. From time to time appropriate TTB officers shall verify the...

  17. Compensation for Blur Requires Increase in Field of View and Viewing Time

    PubMed Central

    Kwon, MiYoung; Liu, Rong; Chien, Lillian

    2016-01-01

    Spatial resolution is an important factor for human pattern recognition. In particular, low resolution (blur) is a defining characteristic of low vision. Here, we examined spatial (field of view) and temporal (stimulus duration) requirements for blurry object recognition. The spatial resolution of an image such as letter or face, was manipulated with a low-pass filter. In experiment 1, studying spatial requirement, observers viewed a fixed-size object through a window of varying sizes, which was repositioned until object identification (moving window paradigm). Field of view requirement, quantified as the number of “views” (window repositions) for correct recognition, was obtained for three blur levels, including no blur. In experiment 2, studying temporal requirement, we determined threshold viewing time, the stimulus duration yielding criterion recognition accuracy, at six blur levels, including no blur. For letter and face recognition, we found blur significantly increased the number of views, suggesting a larger field of view is required to recognize blurry objects. We also found blur significantly increased threshold viewing time, suggesting longer temporal integration is necessary to recognize blurry objects. The temporal integration reflects the tradeoff between stimulus intensity and time. While humans excel at recognizing blurry objects, our findings suggest compensating for blur requires increased field of view and viewing time. The need for larger spatial and longer temporal integration for recognizing blurry objects may further challenge object recognition in low vision. Thus, interactions between blur and field of view should be considered for developing low vision rehabilitation or assistive aids. PMID:27622710

  18. Correlates and perceived outcomes of four types of employee development activity.

    PubMed

    Birdi, K; Allan, C; Warr, P

    1997-12-01

    Participation in 4 different types of development activity was studied in a sample of manufacturing employees (N = 1,798). It was found that similar sets of variables were linked to greater participation in 3 activities: required training courses in work time, work-based development activity in work time, and career planning activity in work time or an individual's own time. Three kinds of reported benefits were studied, and the occurrence of these benefits was found to vary between different types of development activity. Overall job satisfaction and organizational commitment were significantly associated with prior participation in required training courses and work-based development activity. However, voluntary learning in one's own time was completely unrelated to these work attitudes.

  19. Body mass index affects time to definitive closure after damage control surgery.

    PubMed

    Haricharan, Ramanath N; Dooley, Adam C; Weinberg, Jordan A; McGwin, Gerald; MacLennan, Paul A; Griffin, Russell L; Rue, Loring W; Reiff, Donald A

    2009-06-01

    A growing body of literature demonstrates that irrespective of the mechanism of injury, obesity is associated with significantly worse morbidity and mortality after trauma. Among patients requiring damage control laparotomy (DCL), clinical experience suggests that obesity affects time to definitive closure though this association has never been demonstrated quantitatively. All patients at an academic Level I trauma center requiring a DCL between January 2002 and December 2006 (N = 148) were included. Information pertaining to demographic, injury, and clinical characteristics was abstracted from patient medical records. The risk of specific complications including pneumonia, renal failure, and sepsis was compared between normal and overweight/obese patients, as measured by body mass index (BMI). The lengths of intensive care unit (ICU) stay and mechanical ventilation as well as time to abdominal closure were also compared. The risk of pneumonia, sepsis, and renal failure was 2.05-times, 1.77-times, and 2.84-times higher among overweight patients compared with patients with a normal BMI. The risk of pneumonia, sepsis, and renal failure was 2.01-times, 4.24-times, and 1.85-times higher among obese patients compared with those with a normal BMI. Obese patients also had a significantly longer ICU length of stay (28.7 days vs. 15.1 days; p < 0.0001), longer hospitalization (39.3 days vs. 27.0 days; p = 0.008), and time to definitive closure (8.4 days vs. 3.9 days; p = 0.03) compared with patients with a normal BMI. Among patients requiring DCL, those who are overweight or obese have a prolonged time to definitive closure. These patients also experience a significantly longer ICU course and a higher risk of pneumonia.

  20. Development of a real-time microchip PCR system for portable plant disease diagnosis.

    PubMed

    Koo, Chiwan; Malapi-Wight, Martha; Kim, Hyun Soo; Cifci, Osman S; Vaughn-Diaz, Vanessa L; Ma, Bo; Kim, Sungman; Abdel-Raziq, Haron; Ong, Kevin; Jo, Young-Ki; Gross, Dennis C; Shim, Won-Bo; Han, Arum

    2013-01-01

    Rapid and accurate detection of plant pathogens in the field is crucial to prevent the proliferation of infected crops. Polymerase chain reaction (PCR) process is the most reliable and accepted method for plant pathogen diagnosis, however current conventional PCR machines are not portable and require additional post-processing steps to detect the amplified DNA (amplicon) of pathogens. Real-time PCR can directly quantify the amplicon during the DNA amplification without the need for post processing, thus more suitable for field operations, however still takes time and require large instruments that are costly and not portable. Microchip PCR systems have emerged in the past decade to miniaturize conventional PCR systems and to reduce operation time and cost. Real-time microchip PCR systems have also emerged, but unfortunately all reported portable real-time microchip PCR systems require various auxiliary instruments. Here we present a stand-alone real-time microchip PCR system composed of a PCR reaction chamber microchip with integrated thin-film heater, a compact fluorescence detector to detect amplified DNA, a microcontroller to control the entire thermocycling operation with data acquisition capability, and a battery. The entire system is 25 × 16 × 8 cm(3) in size and 843 g in weight. The disposable microchip requires only 8-µl sample volume and a single PCR run consumes 110 mAh of power. A DNA extraction protocol, notably without the use of liquid nitrogen, chemicals, and other large lab equipment, was developed for field operations. The developed real-time microchip PCR system and the DNA extraction protocol were used to successfully detect six different fungal and bacterial plant pathogens with 100% success rate to a detection limit of 5 ng/8 µl sample.

  1. Development of a Real-Time Microchip PCR System for Portable Plant Disease Diagnosis

    PubMed Central

    Kim, Hyun Soo; Cifci, Osman S.; Vaughn-Diaz, Vanessa L.; Ma, Bo; Kim, Sungman; Abdel-Raziq, Haron; Ong, Kevin; Jo, Young-Ki; Gross, Dennis C.; Shim, Won-Bo; Han, Arum

    2013-01-01

    Rapid and accurate detection of plant pathogens in the field is crucial to prevent the proliferation of infected crops. Polymerase chain reaction (PCR) process is the most reliable and accepted method for plant pathogen diagnosis, however current conventional PCR machines are not portable and require additional post-processing steps to detect the amplified DNA (amplicon) of pathogens. Real-time PCR can directly quantify the amplicon during the DNA amplification without the need for post processing, thus more suitable for field operations, however still takes time and require large instruments that are costly and not portable. Microchip PCR systems have emerged in the past decade to miniaturize conventional PCR systems and to reduce operation time and cost. Real-time microchip PCR systems have also emerged, but unfortunately all reported portable real-time microchip PCR systems require various auxiliary instruments. Here we present a stand-alone real-time microchip PCR system composed of a PCR reaction chamber microchip with integrated thin-film heater, a compact fluorescence detector to detect amplified DNA, a microcontroller to control the entire thermocycling operation with data acquisition capability, and a battery. The entire system is 25×16×8 cm3 in size and 843 g in weight. The disposable microchip requires only 8-µl sample volume and a single PCR run consumes 110 mAh of power. A DNA extraction protocol, notably without the use of liquid nitrogen, chemicals, and other large lab equipment, was developed for field operations. The developed real-time microchip PCR system and the DNA extraction protocol were used to successfully detect six different fungal and bacterial plant pathogens with 100% success rate to a detection limit of 5 ng/8 µl sample. PMID:24349341

  2. User Requirements for a Chronic Kidney Disease Clinical Decision Support Tool to Promote Timely Referral.

    PubMed

    Gulla, Joy; Neri, Pamela M; Bates, David W; Samal, Lipika

    2017-05-01

    Timely referral of patients with CKD has been associated with cost and mortality benefits, but referrals are often done too late in the course of the disease. Clinical decision support (CDS) offers a potential solution, but interventions have failed because they were not designed to support the physician workflow. We sought to identify user requirements for a chronic kidney disease (CKD) CDS system to promote timely referral. We interviewed primary care physicians (PCPs) to identify data needs for a CKD CDS system that would encourage timely referral and also gathered information about workflow to assess risk factors for progression of CKD. Interviewees were general internists recruited from a network of 14 primary care clinics affiliated with Brigham and Women's Hospital (BWH). We then performed a qualitative analysis to identify user requirements and system attributes for a CKD CDS system. Of the 12 participants, 25% were women, the mean age was 53 (range 37-82), mean years in clinical practice was 27 (range 11-58). We identified 21 user requirements. Seven of these user requirements were related to support for the referral process workflow, including access to pertinent information and support for longitudinal co-management. Six user requirements were relevant to PCP management of CKD, including management of risk factors for progression, interpretation of biomarkers of CKD severity, and diagnosis of the cause of CKD. Finally, eight user requirements addressed user-centered design of CDS, including the need for actionable information, links to guidelines and reference materials, and visualization of trends. These 21 user requirements can be used to design an intuitive and usable CDS system with the attributes necessary to promote timely referral. Copyright © 2017 Elsevier B.V. All rights reserved.

  3. Next Generation Real-Time Systems: Investigating the Potential of Partial-Solution Tasks.

    DTIC Science & Technology

    1994-12-01

    insufficient for dealing with the complexities of next-generation real - time systems . New methods of intelligent control must be developed for guaranteeing...on-time task completion for real - time systems that are faced with unpredictable and dynamically changing requirements. Implementing real-time...tasks by experimentally measuring the change in performance of 11 simulated real - time systems when converted from all-or-nothing tasks to partial

  4. Integrated Analysis Tools for Determination of Structural Integrity and Durability of High temperature Polymer Matrix Composites

    DTIC Science & Technology

    2008-08-18

    fidelity will be used to reduce the massive experimental testing and associated time required for qualification of new materials. Tools and...develping a model of the thermo-oxidative process for polymer systems, that incorporates the effects of reaction rates, Fickian diffusion, time varying...degradation processes. Year: 2005 Month: 12 Not required at this time . AIR FORCE OFFICE OF SCIENTIFIC KESEARCH 04 SEP 2008 Page 2 of 2 DTIC Data

  5. Performance Analysis of Live-Virtual-Constructive and Distributed Virtual Simulations: Defining Requirements in Terms of Temporal Consistency

    DTIC Science & Technology

    2009-12-01

    events. Work associated with aperiodic tasks have the same statistical behavior and the same timing requirements. The timing deadlines are soft. • Sporadic...answers, but it is possible to calculate how precise the estimates are. Simulation-based performance analysis of a model includes a statistical ...to evaluate all pos- sible states in a timely manner. This is the principle reason for resorting to simulation and statistical analysis to evaluate

  6. United States Air and Space Power in the 21st Century: Strategic Appraisal

    DTIC Science & Technology

    2002-01-01

    changes in current U.S. nuclear operational practice. It would require at the very least • suitable planning systems (e.g., near- real - time target...to increase real - time visibility into demands, inventories, and flows will likely be very valuable in this regard. Robust, well-stocked FSLs will...of the type of wholesale shift required. The current system is designed for heavy deployments with fairly long lead times . To sup- port Air

  7. A fast sequence assembly method based on compressed data structures.

    PubMed

    Liang, Peifeng; Zhang, Yancong; Lin, Kui; Hu, Jinglu

    2014-01-01

    Assembling a large genome using next generation sequencing reads requires large computer memory and a long execution time. To reduce these requirements, a memory and time efficient assembler is presented from applying FM-index in JR-Assembler, called FMJ-Assembler, where FM stand for FMR-index derived from the FM-index and BWT and J for jumping extension. The FMJ-Assembler uses expanded FM-index and BWT to compress data of reads to save memory and jumping extension method make it faster in CPU time. An extensive comparison of the FMJ-Assembler with current assemblers shows that the FMJ-Assembler achieves a better or comparable overall assembly quality and requires lower memory use and less CPU time. All these advantages of the FMJ-Assembler indicate that the FMJ-Assembler will be an efficient assembly method in next generation sequencing technology.

  8. Design and performance analysis of solid-propellant rocket motors using a simplified computer program

    NASA Technical Reports Server (NTRS)

    Sforzini, R. H.

    1972-01-01

    An analysis and a computer program are presented which represent a compromise between the more sophisticated programs using precise burning geometric relations and the textbook type of solutions. The program requires approximately 900 computer cards including a set of 20 input data cards required for a typical problem. The computer operating time for a single configuration is approximately 1 minute and 30 seconds on the IBM 360 computer. About l minute and l5 seconds of the time is compilation time so that additional configurations input at the same time require approximately 15 seconds each. The program uses approximately 11,000 words on the IBM 360. The program is written in FORTRAN 4 and is readily adaptable for use on a number of different computers: IBM 7044, IBM 7094, and Univac 1108.

  9. Hurricane Wave Topography and Directional Wave Spectra in Near Real-Time

    DTIC Science & Technology

    2005-09-30

    Develop and/or modify the real - time operating system and analysis techniques and programs of the NASA Scanning Radar Altimeter (SRA) to process the...Wayne Wright is responsible for the real - time operating system of the SRA and making whatever modifications are required to enable near real-time

  10. 7 CFR 62.300 - Fees and other costs for service.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    .... Fees for QSVP services shall be based on the time required to provide service calculated to the nearest quarter hour period, including, but not limited to, official assessment time, travel time, and time... costs. Applicants are responsible for paying actual travel costs incurred to provide QSVP services...

  11. 7 CFR 62.300 - Fees and other costs for service.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    .... Fees for QSVP services shall be based on the time required to provide service calculated to the nearest quarter hour period, including, but not limited to, official assessment time, travel time, and time... costs. Applicants are responsible for paying actual travel costs incurred to provide QSVP services...

  12. 7 CFR 62.300 - Fees and other costs for service.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    .... Fees for QSVP services shall be based on the time required to provide service calculated to the nearest quarter hour period, including, but not limited to, official assessment time, travel time, and time... costs. Applicants are responsible for paying actual travel costs incurred to provide QSVP services...

  13. 23 CFR 511.309 - Provisions for traffic and travel conditions reporting.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... requirements for traffic and travel conditions made available by real-time information programs are: (1... or less from the time the hazardous conditions, blockage, or closure is observed. (4) Travel time information. The timeliness for the availability of travel time information along limited access roadway...

  14. 7 CFR 62.300 - Fees and other costs for service.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    .... Fees for QSVP services shall be based on the time required to provide service calculated to the nearest quarter hour period, including, but not limited to, official assessment time, travel time, and time... costs. Applicants are responsible for paying actual travel costs incurred to provide QSVP services...

  15. 7 CFR 62.300 - Fees and other costs for service.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    .... Fees for QSVP services shall be based on the time required to provide service calculated to the nearest quarter hour period, including, but not limited to, official assessment time, travel time, and time... costs. Applicants are responsible for paying actual travel costs incurred to provide QSVP services...

  16. Characterization of within-day beginning times of storms for stochastic simulation

    USDA-ARS?s Scientific Manuscript database

    The beginning times of storms within a day are often required for stochastic modeling purposes and for studies on plant growth. This study investigated the variation in frequency distributions of storm-initiation time (SI time) within a day due to elevation changes and month. Actual storms without 2...

  17. 76 FR 33780 - Extension of Time for Inventory

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-09

    ... DEPARTMENT OF THE INTERIOR National Park Service [2253-665] Extension of Time for Inventory AGENCY... recognized Indian Tribe or an institution receives Federal funds for the first time. Section 5 of the statute (25 U.S.C. 3003(c)) authorizes the Secretary of the Interior to extend the inventory time requirements...

  18. 22 CFR 1429.13 - Official time.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 22 Foreign Relations 2 2013-04-01 2009-04-01 true Official time. 1429.13 Section 1429.13 Foreign... REQUIREMENTS Miscellaneous § 1429.13 Official time. If the participation of any employee in any phase of any... of the Board designated by the Board, such employee shall be granted official time for such...

  19. 7 CFR 718.10 - Time limitations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 7 2011-01-01 2011-01-01 false Time limitations. 718.10 Section 718.10 Agriculture... General Provisions § 718.10 Time limitations. Whenever the final date prescribed in any of the regulations... open for the transaction of business during normal working hours, the time for taking required action...

  20. 7 CFR 718.10 - Time limitations.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 7 2012-01-01 2012-01-01 false Time limitations. 718.10 Section 718.10 Agriculture... General Provisions § 718.10 Time limitations. Whenever the final date prescribed in any of the regulations... open for the transaction of business during normal working hours, the time for taking required action...

  1. 22 CFR 1429.13 - Official time.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 22 Foreign Relations 2 2012-04-01 2009-04-01 true Official time. 1429.13 Section 1429.13 Foreign... REQUIREMENTS Miscellaneous § 1429.13 Official time. If the participation of any employee in any phase of any... of the Board designated by the Board, such employee shall be granted official time for such...

  2. 22 CFR 1429.13 - Official time.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 22 Foreign Relations 2 2014-04-01 2014-04-01 false Official time. 1429.13 Section 1429.13 Foreign... REQUIREMENTS Miscellaneous § 1429.13 Official time. If the participation of any employee in any phase of any... of the Board designated by the Board, such employee shall be granted official time for such...

  3. 33 CFR 161.18 - Reporting requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... call. H HOTEL Date, time and point of entry system Entry time expressed as in (B) and into the entry... KILO Date, time and point of exit from system Exit time expressed as in (B) and exit position expressed....; for a dredge or floating plant: configuration of pipeline, mooring configuration, number of assist...

  4. 45 CFR 150.429 - Computation of time and extensions of time.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 1 2010-10-01 2010-10-01 false Computation of time and extensions of time. 150.429 Section 150.429 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES REQUIREMENTS RELATING TO HEALTH CARE ACCESS CMS ENFORCEMENT IN GROUP AND INDIVIDUAL INSURANCE MARKETS Administrative Hearings...

  5. 45 CFR 150.429 - Computation of time and extensions of time.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 1 2011-10-01 2011-10-01 false Computation of time and extensions of time. 150.429 Section 150.429 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES REQUIREMENTS RELATING TO HEALTH CARE ACCESS CMS ENFORCEMENT IN GROUP AND INDIVIDUAL INSURANCE MARKETS Administrative Hearings...

  6. 22 CFR 1429.13 - Official time.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 22 Foreign Relations 2 2011-04-01 2009-04-01 true Official time. 1429.13 Section 1429.13 Foreign... REQUIREMENTS Miscellaneous § 1429.13 Official time. If the participation of any employee in any phase of any... of the Board designated by the Board, such employee shall be granted official time for such...

  7. 7 CFR 3575.88 - Transfers and assumptions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... requirements: (1) All transfers to ineligible borrowers will include a one-time nonrefundable transfer fee to... fees. Transfer fees are a one-time nonrefundable cost to be collected by the lender at the time of... time of transfer, and (ii) The lender must certify that the transferor has cooperated in good faith...

  8. 7 CFR 3575.88 - Transfers and assumptions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... requirements: (1) All transfers to ineligible borrowers will include a one-time nonrefundable transfer fee to... fees. Transfer fees are a one-time nonrefundable cost to be collected by the lender at the time of... time of transfer, and (ii) The lender must certify that the transferor has cooperated in good faith...

  9. 5 CFR 842.402 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... required by the administrative workweek for his or her grade or class (normally 40 hours). Part-time... time under 5 U.S.C 8411(d), that follows a period of part-time service without any intervening period of actual service other than part-time service. Proration factor means a fraction expressed as a...

  10. Impact of an electronic health record operating room management system in ophthalmology on documentation time, surgical volume, and staffing.

    PubMed

    Sanders, David S; Read-Brown, Sarah; Tu, Daniel C; Lambert, William E; Choi, Dongseok; Almario, Bella M; Yackel, Thomas R; Brown, Anna S; Chiang, Michael F

    2014-05-01

    Although electronic health record (EHR) systems have potential benefits, such as improved safety and quality of care, most ophthalmology practices in the United States have not adopted these systems. Concerns persist regarding potential negative impacts on clinical workflow. In particular, the impact of EHR operating room (OR) management systems on clinical efficiency in the ophthalmic surgery setting is unknown. To determine the impact of an EHR OR management system on intraoperative nursing documentation time, surgical volume, and staffing requirements. For documentation time and circulating nurses per procedure, a prospective cohort design was used between January 10, 2012, and January 10, 2013. For surgical volume and overall staffing requirements, a case series design was used between January 29, 2011, and January 28, 2013. This study involved ophthalmic OR nurses (n = 13) and surgeons (n = 25) at an academic medical center. Electronic health record OR management system implementation. (1) Documentation time (percentage of operating time documenting [POTD], absolute documentation time in minutes), (2) surgical volume (procedures/time), and (3) staffing requirements (full-time equivalents, circulating nurses/procedure). Outcomes were measured during a baseline period when paper documentation was used and during the early (first 3 months) and late (4-12 months) periods after EHR implementation. There was a worsening in total POTD in the early EHR period (83%) vs paper baseline (41%) (P < .001). This improved to baseline levels by the late EHR period (46%, P = .28), although POTD in the cataract group remained worse than at baseline (64%, P < .001). There was a worsening in absolute mean documentation time in the early EHR period (16.7 minutes) vs paper baseline (7.5 minutes) (P < .001). This improved in the late EHR period (9.2 minutes) but remained worse than in the paper baseline (P < .001). While cataract procedures required more circulating nurses in the early EHR (mean, 1.9 nurses/procedure) and late EHR (mean, 1.5 nurses/procedure) periods than in the paper baseline (mean, 1.0 nurses/procedure) (P < .001), overall staffing requirements and surgical volume were not significantly different between the periods. Electronic health record OR management system implementation was associated with worsening of intraoperative nursing documentation time especially in shorter procedures. However, it is possible to implement an EHR OR management system without serious negative impacts on surgical volume and staffing requirements.

  11. 41 CFR 301-10.137 - What exceptions to the Fly America Act requirements apply when I travel solely outside the United...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... or more; or (b) Extend your travel time by 6 hours or more; or (c) Require a connecting time of 4... Fly America Act requirements apply when I travel solely outside the United States, and a U.S. flag air... Contracts and Property Management Federal Travel Regulation System TEMPORARY DUTY (TDY) TRAVEL ALLOWANCES...

  12. 41 CFR 301-10.137 - What exceptions to the Fly America Act requirements apply when I travel solely outside the United...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... or more; or (b) Extend your travel time by 6 hours or more; or (c) Require a connecting time of 4... Fly America Act requirements apply when I travel solely outside the United States, and a U.S. flag air... Contracts and Property Management Federal Travel Regulation System TEMPORARY DUTY (TDY) TRAVEL ALLOWANCES...

  13. 41 CFR 301-10.137 - What exceptions to the Fly America Act requirements apply when I travel solely outside the United...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... or more; or (b) Extend your travel time by 6 hours or more; or (c) Require a connecting time of 4... Fly America Act requirements apply when I travel solely outside the United States, and a U.S. flag air... Contracts and Property Management Federal Travel Regulation System TEMPORARY DUTY (TDY) TRAVEL ALLOWANCES...

  14. 41 CFR 301-10.137 - What exceptions to the Fly America Act requirements apply when I travel solely outside the United...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... or more; or (b) Extend your travel time by 6 hours or more; or (c) Require a connecting time of 4... Fly America Act requirements apply when I travel solely outside the United States, and a U.S. flag air... Contracts and Property Management Federal Travel Regulation System TEMPORARY DUTY (TDY) TRAVEL ALLOWANCES...

  15. 41 CFR 301-10.137 - What exceptions to the Fly America Act requirements apply when I travel solely outside the United...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... or more; or (b) Extend your travel time by 6 hours or more; or (c) Require a connecting time of 4... Fly America Act requirements apply when I travel solely outside the United States, and a U.S. flag air... Contracts and Property Management Federal Travel Regulation System TEMPORARY DUTY (TDY) TRAVEL ALLOWANCES...

  16. Expertise on Cognitive Workloads and Performance During Navigation and Target Detection

    DTIC Science & Technology

    2012-03-01

    requiring little or no attention 1. Little confusion, risk, frustration, or anxiety exists and can be easily accomodated 2. Occasionally have spare...to confusion, frustration, or anxiety noticeably adds to workload. Significant compensation is required to maintain adequate performance. 3... anxiety . High to extreme determination and self- control required 59 Field Description elapsedTime (sec) Continuous measurement of time from the

  17. Effect of wet bulb depression on heat sterilization time of slash pine lumber

    Treesearch

    William T. Simpson

    For international trade, heat sterilization of wood products is often required to prevent the spread of insects and pathogens. Application of heat sterilization requires estimates of the time necessary to heat the center of the wood configuration to the temperature required to kill the insect or other pest. The nature of the heating medium was found to have a...

  18. The Timing of Multiple Retrieval Events Can Alter GluR1 Phosphorylation and the Requirement for Protein Synthesis in Fear Memory Reconsolidation

    ERIC Educational Resources Information Center

    Jarome, Timothy J.; Kwapis, Janine L.; Werner, Craig T.; Parsons, Ryan G.; Gafford, Georgette M.; Helmstetter, Fred J.

    2012-01-01

    Numerous studies have indicated that maintaining a fear memory after retrieval requires de novo protein synthesis. However, no study to date has examined how the temporal dynamics of repeated retrieval events affect this protein synthesis requirement. The present study varied the timing of a second retrieval of an established auditory fear memory…

  19. Where Has the Time Gone? Faculty Activities and Time Commitments in the Online Classroom

    ERIC Educational Resources Information Center

    Mandernach, B. Jean; Hudson, Swinton; Wise, Shanna

    2013-01-01

    While research has examined the comparative time commitment required for online versus face-to-face teaching, little is known about the distribution of faculty time investment into the various aspects of online course facilitation. The purpose of this study is to examine the proportion of time faculty devote to each of the pedagogical components…

  20. Time Management and Academic Achievement of Higher Secondary Students

    ERIC Educational Resources Information Center

    Cyril, A. Vences

    2015-01-01

    The only thing, which can't be changed by man, is time. One cannot get back time lost or gone Nothing can be substituted for time. Time management is actually self management. The skills that people need to manage others are the same skills that are required to manage themselves. The purpose of the present study was to explore the relation between…

  1. What can the Hf–W System tell Us About the Mechanism and Timing of Earth's Core Formation?

    NASA Astrophysics Data System (ADS)

    Fischer, R. A.; Nimmo, F.; O'Brien, D. P.

    2018-05-01

    Strong tradeoff between effects of depth and extent of metal-silicate equilibration and formation timescale on the Hf-W system. Whole mantle equilibration requires k = 0.4. Later formation times require less equilibration to match Earth's anomaly.

  2. 77 FR 36950 - Airworthiness Directives; Dassault Aviation Airplanes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-20

    ... time between overhauls, and required an initial overhaul, of the direct current (DC) generator... overhauls, and required an initial overhaul, of the DC generator (bearings). That NPRM resulted from... condition as: Time between overhaul (TBO) of DC [direct current] generator bearings is set at 1,000 flight...

  3. 29 CFR 4050.6 - Payment and required documentation.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... MISSING PARTICIPANTS § 4050.6 Payment and required documentation. (a) Time of payment and filing. The plan... administrator and the plan's enrolled actuary) specified in the missing participant forms and instructions, by the time the post-distribution certification is due. Except as otherwise provided in the missing...

  4. 29 CFR 4050.6 - Payment and required documentation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... MISSING PARTICIPANTS § 4050.6 Payment and required documentation. (a) Time of payment and filing. The plan... administrator and the plan's enrolled actuary) specified in the missing participant forms and instructions, by the time the post-distribution certification is due. Except as otherwise provided in the missing...

  5. Image/Time Series Mining Algorithms: Applications to Developmental Biology, Document Processing and Data Streams

    ERIC Educational Resources Information Center

    Tataw, Oben Moses

    2013-01-01

    Interdisciplinary research in computer science requires the development of computational techniques for practical application in different domains. This usually requires careful integration of different areas of technical expertise. This dissertation presents image and time series analysis algorithms, with practical interdisciplinary applications…

  6. A new generation of real-time DOS technology for mission-oriented system integration and operation

    NASA Technical Reports Server (NTRS)

    Jensen, E. Douglas

    1988-01-01

    Information is given on system integration and operation (SIO) requirements and a new generation of technical approaches for SIO. Real-time, distribution, survivability, and adaptability requirements and technical approaches are covered. An Alpha operating system program management overview is outlined.

  7. How much is not enough? Human resources requirements for primary health care: a case study from South Africa.

    PubMed

    Daviaud, Emmanuelle; Chopra, Mickey

    2008-01-01

    To quantify staff requirements in primary health care facilities in South Africa through an adaptation of the WHO workload indicator of staff needs tool. We use a model to estimate staffing requirements at primary health care facilities. The model integrates several empirically-based assumptions including time and type of health worker required for each type of consultation, amount of management time required, amount of clinical support required and minimum staff requirements per type of facility. We also calculate the number of HIV-related consultations per district. The model incorporates type of facility, monthly travelling time for mobile clinics, opening hours per week, yearly activity and current staffing and calculates the expected staffing per category of staff per facility and compares it to the actual staffing. Across all the districts there is either an absence of doctors visiting clinics or too few doctors to cover the opening times of community health centres. Overall the number of doctors is only 7% of the required amount. There is 94% of the required number of professional nurses but with wide variations between districts, with a few districts having excesses while most have shortages. The number of enrolled nurses is 60% of what it should be. There are 17% too few enrolled nurse assistants. Across all districts there is wide variation in staffing levels between facilities leading to inefficient use of professional staff. The application of an adapted WHO workload tool identified important human resource planning issues.

  8. High-visibility time-bin entanglement for testing chained Bell inequalities

    NASA Astrophysics Data System (ADS)

    Tomasin, Marco; Mantoan, Elia; Jogenfors, Jonathan; Vallone, Giuseppe; Larsson, Jan-Åke; Villoresi, Paolo

    2017-03-01

    The violation of Bell's inequality requires a well-designed experiment to validate the result. In experiments using energy-time and time-bin entanglement, initially proposed by Franson in 1989, there is an intrinsic loophole due to the high postselection. To obtain a violation in this type of experiment, a chained Bell inequality must be used. However, the local realism bound requires a high visibility in excess of 94.63% in the time-bin entangled state. In this work, we show how such a high visibility can be reached in order to violate a chained Bell inequality with six, eight, and ten terms.

  9. Choosing a software design method for real-time Ada applications: JSD process inversion as a means to tailor a design specification to the performance requirements and target machine

    NASA Technical Reports Server (NTRS)

    Withey, James V.

    1986-01-01

    The validity of real-time software is determined by its ability to execute on a computer within the time constraints of the physical system it is modeling. In many applications the time constraints are so critical that the details of process scheduling are elevated to the requirements analysis phase of the software development cycle. It is not uncommon to find specifications for a real-time cyclic executive program included to assumed in such requirements. It was found that prelininary designs structured around this implementation abscure the data flow of the real world system that is modeled and that it is consequently difficult and costly to maintain, update and reuse the resulting software. A cyclic executive is a software component that schedules and implicitly synchronizes the real-time software through periodic and repetitive subroutine calls. Therefore a design method is sought that allows the deferral of process scheduling to the later stages of design. The appropriate scheduling paradigm must be chosen given the performance constraints, the largest environment and the software's lifecycle. The concept of process inversion is explored with respect to the cyclic executive.

  10. Managing high-bandwidth real-time data storage

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bigelow, David D.; Brandt, Scott A; Bent, John M

    2009-09-23

    There exist certain systems which generate real-time data at high bandwidth, but do not necessarily require the long-term retention of that data in normal conditions. In some cases, the data may not actually be useful, and in others, there may be too much data to permanently retain in long-term storage whether it is useful or not. However, certain portions of the data may be identified as being vitally important from time to time, and must therefore be retained for further analysis or permanent storage without interrupting the ongoing collection of new data. We have developed a system, Mahanaxar, intended tomore » address this problem. It provides quality of service guarantees for incoming real-time data streams and simultaneous access to already-recorded data on a best-effort basis utilizing any spare bandwidth. It has built in mechanisms for reliability and indexing, can scale upwards to meet increasing bandwidth requirements, and handles both small and large data elements equally well. We will show that a prototype version of this system provides better performance than a flat file (traditional filesystem) based version, particularly with regard to quality of service guarantees and hard real-time requirements.« less

  11. Considering Time-Scale Requirements for the Future

    DTIC Science & Technology

    2013-05-01

    geocentric reference frame with the SI second realized on the rotating geoid as the scale unit. It is a continuous atomic time scale that was...the B8lycentric and Geocentric Celestial Reference Systems, two time scales, Barycentric Coor- dinate Time (TCB) and Geocentric Coordinate Time (TCG...defined in 2006 as a linear scaling of TCB having the approximate rate of TT. TCG is the time coordinate for the four dimensional geocentric coordinate

  12. Real-time and high accuracy frequency measurements for intermediate frequency narrowband signals

    NASA Astrophysics Data System (ADS)

    Tian, Jing; Meng, Xiaofeng; Nie, Jing; Lin, Liwei

    2018-01-01

    Real-time and accurate measurements of intermediate frequency signals based on microprocessors are difficult due to the computational complexity and limited time constraints. In this paper, a fast and precise methodology based on the sigma-delta modulator is designed and implemented by first generating the twiddle factors using the designed recursive scheme. This scheme requires zero times of multiplications and only half amounts of addition operations by using the discrete Fourier transform (DFT) and the combination of the Rife algorithm and Fourier coefficient interpolation as compared with conventional methods such as DFT and Fast Fourier Transform. Experimentally, when the sampling frequency is 10 MHz, the real-time frequency measurements with intermediate frequency and narrowband signals have a measurement mean squared error of ±2.4 Hz. Furthermore, a single measurement of the whole system only requires approximately 0.3 s to achieve fast iteration, high precision, and less calculation time.

  13. Software defined photon counting system for time resolved x-ray experiments.

    PubMed

    Acremann, Y; Chembrolu, V; Strachan, J P; Tyliszczak, T; Stöhr, J

    2007-01-01

    The time structure of synchrotron radiation allows time resolved experiments with sub-100 ps temporal resolution using a pump-probe approach. However, the relaxation time of the samples may require a lower repetition rate of the pump pulse compared to the full repetition rate of the x-ray pulses from the synchrotron. The use of only the x-ray pulse immediately following the pump pulse is not efficient and often requires special operation modes where only a few buckets of the storage ring are filled. We designed a novel software defined photon counting system that allows to implement a variety of pump-probe schemes at the full repetition rate. The high number of photon counters allows to detect the response of the sample at multiple time delays simultaneously, thus improving the efficiency of the experiment. The system has been successfully applied to time resolved scanning transmission x-ray microscopy. However, this technique is applicable more generally.

  14. Backscatter particle image velocimetry via optical time-of-flight sectioning

    DOE PAGES

    Paciaroni, Megan E.; Chen, Yi; Lynch, Kyle Patrick; ...

    2018-01-11

    Conventional particle image velocimetry (PIV) configurations require a minimum of two optical access ports, inherently restricting the technique to a limited class of flows. Here, the development and application of a novel method of backscattered time-gated PIV requiring a single-optical-access port is described along with preliminary results. The light backscattered from a seeded flow is imaged over a narrow optical depth selected by an optical Kerr effect (OKE) time gate. The picosecond duration of the OKE time gate essentially replicates the width of the laser sheet of conventional PIV by limiting detected photons to a narrow time-of-flight within the flow.more » Thus, scattering noise from outside the measurement volume is eliminated. In conclusion, this PIV via the optical time-of-flight sectioning technique can be useful in systems with limited optical access and in flows near walls or other scattering surfaces.« less

  15. Time-response shaping using output to input saturation transformation

    NASA Astrophysics Data System (ADS)

    Chambon, E.; Burlion, L.; Apkarian, P.

    2018-03-01

    For linear systems, the control law design is often performed so that the resulting closed loop meets specific frequency-domain requirements. However, in many cases, it may be observed that the obtained controller does not enforce time-domain requirements amongst which the objective of keeping a scalar output variable in a given interval. In this article, a transformation is proposed to convert prescribed bounds on an output variable into time-varying saturations on the synthesised linear scalar control law. This transformation uses some well-chosen time-varying coefficients so that the resulting time-varying saturation bounds do not overlap in the presence of disturbances. Using an anti-windup approach, it is obtained that the origin of the resulting closed loop is globally asymptotically stable and that the constrained output variable satisfies the time-domain constraints in the presence of an unknown finite-energy-bounded disturbance. An application to a linear ball and beam model is presented.

  16. Superior memory efficiency of quantum devices for the simulation of continuous-time stochastic processes

    NASA Astrophysics Data System (ADS)

    Elliott, Thomas J.; Gu, Mile

    2018-03-01

    Continuous-time stochastic processes pervade everyday experience, and the simulation of models of these processes is of great utility. Classical models of systems operating in continuous-time must typically track an unbounded amount of information about past behaviour, even for relatively simple models, enforcing limits on precision due to the finite memory of the machine. However, quantum machines can require less information about the past than even their optimal classical counterparts to simulate the future of discrete-time processes, and we demonstrate that this advantage extends to the continuous-time regime. Moreover, we show that this reduction in the memory requirement can be unboundedly large, allowing for arbitrary precision even with a finite quantum memory. We provide a systematic method for finding superior quantum constructions, and a protocol for analogue simulation of continuous-time renewal processes with a quantum machine.

  17. Backscatter particle image velocimetry via optical time-of-flight sectioning

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Paciaroni, Megan E.; Chen, Yi; Lynch, Kyle Patrick

    Conventional particle image velocimetry (PIV) configurations require a minimum of two optical access ports, inherently restricting the technique to a limited class of flows. Here, the development and application of a novel method of backscattered time-gated PIV requiring a single-optical-access port is described along with preliminary results. The light backscattered from a seeded flow is imaged over a narrow optical depth selected by an optical Kerr effect (OKE) time gate. The picosecond duration of the OKE time gate essentially replicates the width of the laser sheet of conventional PIV by limiting detected photons to a narrow time-of-flight within the flow.more » Thus, scattering noise from outside the measurement volume is eliminated. In conclusion, this PIV via the optical time-of-flight sectioning technique can be useful in systems with limited optical access and in flows near walls or other scattering surfaces.« less

  18. Time required for institutional review board review at one Veterans Affairs medical center.

    PubMed

    Hall, Daniel E; Hanusa, Barbara H; Stone, Roslyn A; Ling, Bruce S; Arnold, Robert M

    2015-02-01

    Despite growing concern that institutional review boards (IRBs) impose burdensome delays on research, little is known about the time required for IRB review across different types of research. To measure the overall and incremental process times for IRB review as a process of quality improvement. After developing a detailed process flowchart of the IRB review process, 2 analysts abstracted temporal data from the records pertaining to all 103 protocols newly submitted to the IRB at a large urban Veterans Affairs medical center from June 1, 2009, through May 31, 2011. Disagreements were reviewed with the principal investigator to reach consensus. We then compared the review times across review types using analysis of variance and post hoc Scheffé tests after achieving normally distributed data through logarithmic transformation. Calendar days from initial submission to final approval of research protocols. Initial IRB review took 2 to 4 months, with expedited and exempt reviews requiring less time (median [range], 85 [23-631] and 82 [16-437] days, respectively) than full board reviews (median [range], 131 [64-296] days; P = .008). The median time required for credentialing of investigators was 1 day (range, 0-74 days), and review by the research and development committee took a median of 15 days (range, 0-184 days). There were no significant differences in credentialing or research and development times across review types (exempt, expedited, or full board). Of the extreme delays in IRB review, 80.0% were due to investigators' slow responses to requested changes. There were no systematic delays attributable to the information security officer, privacy officer, or IRB chair. Measuring and analyzing review times is a critical first step in establishing a culture and process of continuous quality improvement among IRBs that govern research programs. The review times observed at this IRB are substantially longer than the 60-day target recommended by expert panels. The method described here could be applied to other IRBs to begin identifying and improving inefficiencies.

  19. Accelerating the discovery of space-time patterns of infectious diseases using parallel computing.

    PubMed

    Hohl, Alexander; Delmelle, Eric; Tang, Wenwu; Casas, Irene

    2016-11-01

    Infectious diseases have complex transmission cycles, and effective public health responses require the ability to monitor outbreaks in a timely manner. Space-time statistics facilitate the discovery of disease dynamics including rate of spread and seasonal cyclic patterns, but are computationally demanding, especially for datasets of increasing size, diversity and availability. High-performance computing reduces the effort required to identify these patterns, however heterogeneity in the data must be accounted for. We develop an adaptive space-time domain decomposition approach for parallel computation of the space-time kernel density. We apply our methodology to individual reported dengue cases from 2010 to 2011 in the city of Cali, Colombia. The parallel implementation reaches significant speedup compared to sequential counterparts. Density values are visualized in an interactive 3D environment, which facilitates the identification and communication of uneven space-time distribution of disease events. Our framework has the potential to enhance the timely monitoring of infectious diseases. Copyright © 2016 Elsevier Ltd. All rights reserved.

  20. SMZ/SNZ and gibberellin signaling are required for nitrate-elicited delay of flowering time in Arabidopsis thaliana.

    PubMed

    Gras, Diana E; Vidal, Elena A; Undurraga, Soledad F; Riveras, Eleodoro; Moreno, Sebastián; Dominguez-Figueroa, José; Alabadi, David; Blázquez, Miguel A; Medina, Joaquín; Gutiérrez, Rodrigo A

    2018-01-23

    The reproductive success of plants largely depends on the correct programming of developmental phase transitions, particularly the shift from vegetative to reproductive growth. The timing of this transition is finely regulated by the integration of an array of environmental and endogenous factors. Nitrogen is the mineral macronutrient that plants require in the largest amount, and as such its availability greatly impacts on many aspects of plant growth and development, including flowering time. We found that nitrate signaling interacts with the age-related and gibberellic acid pathways to control flowering time in Arabidopsis thaliana. We revealed that repressors of flowering time belonging to the AP2-type transcription factor family including SCHLAFMUTZE (SMZ) and SCHNARCHZAPFEN (SNZ) are important regulators of flowering time in response to nitrate. Our results support a model whereby nitrate activates SMZ and SNZ via the gibberellin pathway to repress flowering time in Arabidopsis thaliana. © The Author(s) 2017. Published by Oxford University Press on behalf of the Society for Experimental Biology.

  1. Your scarcest resource.

    PubMed

    Mankins, Michael; Brahm, Chris; Caimi, Gregory

    2014-05-01

    Most companies have elaborate procedures for managing capital. They require a compelling business case for any new capital investment. They set hurdle rates. They delegate authority carefully, prescribing spending limits for each level. An organization's time, by contrast, goes largely unmanaged. Bain & Company, with which all three authors are associated, used innovative people analytics tools to examine the time budgets of 17 large corporations. It discovered that companies are awash in e-communications; meeting time has skyrocketed; real collaboration is limited; dysfunctional meeting behavior is on the rise; formal controls are rare; and the consequences of all this are few. The authors outline eight practices for managing organizational time. Among them are: Make meeting agendas clear and selective; create a zero-based time budget; require business cases for all initiatives; and standardize the decision process. Some forward-thinking companies bring as much discipline to their time budgets as to their capital budgets. As a result, they have Liberated countless hours of previously unproductive time for executives and employees, fueling innovation and accelerating profitable growth.

  2. Oral surgical handpiece use time parameters.

    PubMed

    Roberts, Howard W; Cohen, Mark E; Murchison, David F

    2005-07-01

    To evaluate the clinical usage time parameters of handpieces used in oral surgical procedures. One hundred randomly selected clinical oral surgery exodontia procedures were timed to record lengths of continuous segments of both handpiece use and non-usage. Providers with experience ranging from general dentists to board certified oral surgeons were timed during surgical exodontia treatment involving 1 to 4 teeth of various complexities. Usage times were compared with manufacturers' recommendations that on times should not exceed 20 seconds in any 50-second interval (20/50 rule). Handpiece run time increased with the number of teeth and surgical case complexity (both P < .001) but was unrelated to operator experience (P = .763), in a 3-predictor model (R2 = 0.20; P < .001). Ninety-four of the 100 cases experienced at least 1 second in violation of the 20/50 rule and 42% of all run seconds were in violation. Clinicians should be aware of recommended handpiece duty use cycles. Manufacturers' recommendations about handpiece use time cycles do not reflect actual clinical usage. Under the conditions of this study, actual surgical handpiece use time was not correlated with user experience. Less experienced providers did require longer to complete treatment, but increased treatment times were due to time spent that did not require surgical handpiece use.

  3. Analysis of data systems requirements for global crop production forecasting in the 1985 time frame

    NASA Technical Reports Server (NTRS)

    Downs, S. W.; Larsen, P. A.; Gerstner, D. A.

    1978-01-01

    Data systems concepts that would be needed to implement the objective of the global crop production forecasting in an orderly transition from experimental to operational status in the 1985 time frame were examined. Information needs of users were converted into data system requirements, and the influence of these requirements on the formulation of a conceptual data system was analyzed. Any potential problem areas in meeting these data system requirements were identified in an iterative process.

  4. Times for interplanetary trips

    NASA Technical Reports Server (NTRS)

    Jones, R. T.

    1976-01-01

    The times required to travel to the various planets at an acceleration of one g are calculated. Surrounding gravitational fields are neglected except for a relatively short distance near take-off or landing. The orbit consists of an essentially straight line with the thrust directed toward the destination up to the halfway point, but in the opposite direction for the remainder so that the velocity is zero on arrival. A table lists the approximate times required, and also the maximum velocities acquired in light units v/c for the various planets.

  5. Parallel processing architecture for computing inverse differential kinematic equations of the PUMA arm

    NASA Technical Reports Server (NTRS)

    Hsia, T. C.; Lu, G. Z.; Han, W. H.

    1987-01-01

    In advanced robot control problems, on-line computation of inverse Jacobian solution is frequently required. Parallel processing architecture is an effective way to reduce computation time. A parallel processing architecture is developed for the inverse Jacobian (inverse differential kinematic equation) of the PUMA arm. The proposed pipeline/parallel algorithm can be inplemented on an IC chip using systolic linear arrays. This implementation requires 27 processing cells and 25 time units. Computation time is thus significantly reduced.

  6. 49 CFR 40.245 - What is the procedure for an alcohol screening test using a saliva ASD or a breath tube ASD?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...'s directions. The result must be read from the analyzer no earlier then the required incubation time... this section and after having waited the required amount of time directed by the manufacturer for the...

  7. 49 CFR 40.245 - What is the procedure for an alcohol screening test using a saliva ASD or a breath tube ASD?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...'s directions. The result must be read from the analyzer no earlier then the required incubation time... this section and after having waited the required amount of time directed by the manufacturer for the...

  8. 49 CFR 40.245 - What is the procedure for an alcohol screening test using a saliva ASD or a breath tube ASD?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...'s directions. The result must be read from the analyzer no earlier then the required incubation time... this section and after having waited the required amount of time directed by the manufacturer for the...

  9. Increasing chilling reduces heat requirement for floral budbreak in peach

    USDA-ARS?s Scientific Manuscript database

    Response to chilling temperatures is a critical factor in the suitability of peach [Prunus persica (L.) Batsch] cultivars to moderate climates such as in the southeastern United States. Time of bloom depends on the innate chilling requirement of the cultivar as well as the timing and quantity of co...

  10. 31 CFR 357.29 - Time required for processing transaction request.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 31 Money and Finance:Treasury 2 2013-07-01 2013-07-01 false Time required for processing transaction request. 357.29 Section 357.29 Money and Finance: Treasury Regulations Relating to Money and Finance (Continued) FISCAL SERVICE, DEPARTMENT OF THE TREASURY BUREAU OF THE PUBLIC DEBT REGULATIONS...

  11. 31 CFR 357.29 - Time required for processing transaction request.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 31 Money and Finance:Treasury 2 2011-07-01 2011-07-01 false Time required for processing transaction request. 357.29 Section 357.29 Money and Finance: Treasury Regulations Relating to Money and Finance (Continued) FISCAL SERVICE, DEPARTMENT OF THE TREASURY BUREAU OF THE PUBLIC DEBT REGULATIONS...

  12. 31 CFR 357.29 - Time required for processing transaction request.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 31 Money and Finance:Treasury 2 2012-07-01 2012-07-01 false Time required for processing transaction request. 357.29 Section 357.29 Money and Finance: Treasury Regulations Relating to Money and Finance (Continued) FISCAL SERVICE, DEPARTMENT OF THE TREASURY BUREAU OF THE PUBLIC DEBT REGULATIONS...

  13. 31 CFR 357.29 - Time required for processing transaction request.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 31 Money and Finance: Treasury 2 2014-07-01 2014-07-01 false Time required for processing transaction request. 357.29 Section 357.29 Money and Finance: Treasury Regulations Relating to Money and Finance (Continued) FISCAL SERVICE, DEPARTMENT OF THE TREASURY BUREAU OF THE FISCAL SERVICE REGULATIONS...

  14. Detection of Illicit Drugs on Surfaces Using Direct Analysis in Real Time (DART)/Time-of-Flight Mass Spectrometry

    EPA Science Inventory

    Methamphetamine (meth) residues from meth syntheses or habitual meth smoking pose human health hazards. State health departments require remediation of meth labs before properties are sold. NIOSH methods for meth analysis require wipe sampling, extraction, cleanup, solvent excha...

  15. 77 FR 15813 - Preoperational Testing of Instrument and Control Air Systems

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-16

    ... seismic requirement, ICAS air-dryer testing to meet dew point design requirements, ICAS accumulator check... ensure consideration only for comments received on or before this date. Although a time limit is given... improvements in all published guides are encouraged at any time. ADDRESSES: You may access information and...

  16. 14 CFR 121.380 - Maintenance recording requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... section, the total time in service of each engine and propeller. (iii) The current status of life-limited parts of each airframe, engine, propeller, and appliance. (iv) The time since last overhaul of all items... required. (vii) A list of current major alterations to each airframe, engine, propeller, and appliance. (b...

  17. 14 CFR 121.380 - Maintenance recording requirements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... section, the total time in service of each engine and propeller. (iii) The current status of life-limited parts of each airframe, engine, propeller, and appliance. (iv) The time since last overhaul of all items... required. (vii) A list of current major alterations to each airframe, engine, propeller, and appliance. (b...

  18. 14 CFR 121.380 - Maintenance recording requirements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... section, the total time in service of each engine and propeller. (iii) The current status of life-limited parts of each airframe, engine, propeller, and appliance. (iv) The time since last overhaul of all items... required. (vii) A list of current major alterations to each airframe, engine, propeller, and appliance. (b...

  19. 14 CFR 121.380 - Maintenance recording requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... section, the total time in service of each engine and propeller. (iii) The current status of life-limited parts of each airframe, engine, propeller, and appliance. (iv) The time since last overhaul of all items... required. (vii) A list of current major alterations to each airframe, engine, propeller, and appliance. (b...

  20. 14 CFR 121.380 - Maintenance recording requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... section, the total time in service of each engine and propeller. (iii) The current status of life-limited parts of each airframe, engine, propeller, and appliance. (iv) The time since last overhaul of all items... required. (vii) A list of current major alterations to each airframe, engine, propeller, and appliance. (b...

  1. 33 CFR 230.17 - Filing requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... supplement, district commanders will establish a time schedule for each step of the process based upon considerations listed in 40 CFR 1501.8 and upon other management considerations. The time required from the... reviews by division and the incorporation of division's comments in the EIS. HQUSACE and/or division will...

  2. 40 CFR 82.156 - Required practices.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... the additional time needed to conduct and complete repairs in a safe working environment will be... creating a safe working environment will require more than 30 weeks; (B) The operator notifies EPA within... the additional time needed to conduct and complete work in a safe environment will be permitted. (iii...

  3. School Leadership in Times of Crisis

    ERIC Educational Resources Information Center

    Smith, Larry; Riley, Dan

    2012-01-01

    The leadership attributes and skills required of school leaders in times of crisis are fundamentally different from those generally required as part of the "normal" school environment. Strong school leadership generally is about positioning the school for the future, and about supporting and empowering staff and students in the pursuit of teaching…

  4. 48 CFR 52.216-30 - Time-and-Materials/Labor-Hour Proposal Requirements-Non-Commercial Item Acquisition without...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...-Hour Proposal Requirements-Non-Commercial Item Acquisition without Adequate Price Competition. 52.216... Price Competition. As prescribed in 16.601(e)(2), insert the following provision: Time-and-Materials/Labor-Hour Proposal Requirements—Non-Commercial Item Acquisition Without Adequate Price Competition (FEB...

  5. 29 CFR 785.17 - On-call time.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 3 2010-07-01 2010-07-01 false On-call time. 785.17 Section 785.17 Labor Regulations... INTERPRETATION NOT DIRECTLY RELATED TO REGULATIONS HOURS WORKED Application of Principles Waiting Time § 785.17 On-call time. An employee who is required to remain on call on the employer's premises or so close...

  6. 29 CFR 785.17 - On-call time.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 3 2011-07-01 2011-07-01 false On-call time. 785.17 Section 785.17 Labor Regulations... INTERPRETATION NOT DIRECTLY RELATED TO REGULATIONS HOURS WORKED Application of Principles Waiting Time § 785.17 On-call time. An employee who is required to remain on call on the employer's premises or so close...

  7. 5 CFR 551.401 - Basic principles.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... direction of the agency is “hours of work.” Such time includes: (1) Time during which an employee is required to be on duty; (2) Time during which an employee is suffered or permitted to work; and (3) Waiting... FAIR LABOR STANDARDS ACT Hours of Work General Provisions § 551.401 Basic principles. (a) All time...

  8. Instructor Time Requirements to Develop and Teach Online Courses

    ERIC Educational Resources Information Center

    Freeman, Lee A.

    2015-01-01

    How much time does it take to teach an online course? Does teaching online take more or less time than teaching face-to-face? Instructors, department chairs, deans, and program administrators have long believed that teaching online is more time-consuming than teaching face-to-face. Many research studies and practitioner articles indicate…

  9. 45 CFR 1635.3 - Timekeeping requirement.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... out in accordance with 45 CFR part 1630. (b) Time spent by attorneys and paralegals must be documented by time records which record the amount of time spent on each case, matter, or supporting activity... which compensation is paid by the recipient. (2) Each record of time spent must contain: for a case, a...

  10. Quality Surveillance Project No. 38-- Mk 9 MC-97 and MC-98 Fuze Setting-Torque Test

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sandia Corporation Surveillance Department

    1954-08-01

    To determine the effects of stockpile storage on the torque required to set the functioning time on the MC-97 (Mechanical T-215 Time Fuze) and the MC-98 Mechanical T-220 Time Fuze). There were reports that the tool for setting the fuze time was breaking.

  11. 76 FR 29805 - Submission for Review: Verification of Full-Time School Attendance, RI 25-49

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-23

    ... OFFICE OF PERSONNEL MANAGEMENT Submission for Review: Verification of Full-Time School Attendance..., Verification of Full-Time School Attendance. As required by the Paperwork Reduction Act of 1995 (Pub. L. 104-13... Full-Time School Attendance, is used to verify that adult student annuitants are entitled to payment...

  12. 77 FR 71200 - Submission for Review: Initial Certification of Full-Time School Attendance, RI 25-41

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-29

    ... OFFICE OF PERSONNEL MANAGEMENT Submission for Review: Initial Certification of Full-Time School...) 3206-0099, Initial Certification of Full-Time School Attendance. As required by the Paperwork Reduction... or faxed to (202) 395-6974. SUPPLEMENTARY INFORMATION: RI 25-41, Initial Certification of Full-Time...

  13. 76 FR 54810 - Submission for Review: 3206-0215, Verification of Full-Time School Attendance, RI 25-49

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-02

    ... OFFICE OF PERSONNEL MANAGEMENT Submission for Review: 3206-0215, Verification of Full-Time School...) 3206-0215, Verification of Full-Time School Attendance. As required by the Paperwork Reduction Act of... or faxed to (202) 395-6974. SUPPLEMENTARY INFORMATION: RI 25-49, Verification of Full-Time School...

  14. 77 FR 33007 - Submission for Review: Initial Certification of Full-Time School Attendance, RI 25-41

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-04

    ... OFFICE OF PERSONNEL MANAGEMENT Submission for Review: Initial Certification of Full-Time School...) 3206-0099, Initial Certification of Full-Time School Attendance. As required by the Paperwork Reduction..., Initial Certification of Full-Time School Attendance, is used to determine whether a child is unmarried...

  15. 76 FR 2573 - Technical Corrections: Matters Subject to Protest and Various Protest Time Limits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-14

    ... 174 [CBP Dec. 11-02] Technical Corrections: Matters Subject to Protest and Various Protest Time Limits..., in pertinent part, the types of matters subject to protest, the time required for allowing or denying an application for further review of a protest, and various other protest time limits. This document...

  16. OMEGA time transmissions and receiver design.

    NASA Technical Reports Server (NTRS)

    Chi, A. R.; Fletcher, L. A.; Casselman, C. J.

    1972-01-01

    This document gives a short history of the development of dual VLF time-transmission technique. The theory of time recovery from the relative phase of the dual-frequency transmission is presented. The transmission and receiving requirements for cycle identification and cycle ambiguity resolution are described. Finally, a prototype OMEGA timing receiving design is described.

  17. Master Clock and Time-Signal-Distribution System

    NASA Technical Reports Server (NTRS)

    Tjoelker, Robert; Calhoun, Malcolm; Kuhnle, Paul; Sydnor, Richard; Lauf, John

    2007-01-01

    A timing system comprising an electronic master clock and a subsystem for distributing time signals from the master clock to end users is undergoing development to satisfy anticipated timing requirements of NASA s Deep Space Network (DSN) for the next 20 to 30 years. This system has a modular, flexible, expandable architecture that is easier to operate and maintain than the present frequency and timing subsystem (FTS).

  18. How to Handle a Satellite Change in an Operational TWSTFT Network?

    DTIC Science & Technology

    2010-11-01

    42 nd Annual Precise Time and Time Interval (PTTI) Meeting 285 HOW TO HANDLE A SATELLITE CHANGE IN AN OPERATIONAL TWSTFT NETWORK...way satellite time and frequency transfer ( TWSTFT ) is a powerful technique because of its real-time capabilities. In principle, the time difference...between remote clocks is almost instantaneously known after a measurement session. Long-term TWSTFT operations have required changes between

  19. Rapid time-resolved diffraction studies of protein structures using synchrotron radiation

    NASA Astrophysics Data System (ADS)

    Bartunik, Hans D.; Bartunik, Lesley J.

    1992-07-01

    The crystal structure of intermediate states in biological reactions of proteins of multi-protein complexes may be studied by time-resolved X-ray diffraction techniques which make use of the high spectral brilliance, continuous wavelength distribution and pulsed time structure of synchrotron radiation. Laue diffraction methods provide a means of investigating intermediate structures with lifetimes in the millisecond time range at presently operational facilities. Third-generation storage rings which are under construction may permit one to reach a time resolution of one microsecond for non-cyclic and one nanosecond for cyclic reactions. The number of individual exposures required for exploring reciprocal space and hence the total time scale strongly depend on the lattice order that may be affected, e.g., by conformational changes. Time-resolved experiments require high population of a specific intermediate which has to be homogeneous over the crystal volume. A number of external excitation techniques have been developed including in situ liberation of active metabolites by laser pulse photolysis of photolabile inactive precursors. First applications to crystal structure analysis of catalytic intermediates of enzymes demonstrate the potential of time-resolved protein crystallography.

  20. Distributed simulation using a real-time shared memory network

    NASA Technical Reports Server (NTRS)

    Simon, Donald L.; Mattern, Duane L.; Wong, Edmond; Musgrave, Jeffrey L.

    1993-01-01

    The Advanced Control Technology Branch of the NASA Lewis Research Center performs research in the area of advanced digital controls for aeronautic and space propulsion systems. This work requires the real-time implementation of both control software and complex dynamical models of the propulsion system. We are implementing these systems in a distributed, multi-vendor computer environment. Therefore, a need exists for real-time communication and synchronization between the distributed multi-vendor computers. A shared memory network is a potential solution which offers several advantages over other real-time communication approaches. A candidate shared memory network was tested for basic performance. The shared memory network was then used to implement a distributed simulation of a ramjet engine. The accuracy and execution time of the distributed simulation was measured and compared to the performance of the non-partitioned simulation. The ease of partitioning the simulation, the minimal time required to develop for communication between the processors and the resulting execution time all indicate that the shared memory network is a real-time communication technique worthy of serious consideration.

  1. Benchmarking hardware architecture candidates for the NFIRAOS real-time controller

    NASA Astrophysics Data System (ADS)

    Smith, Malcolm; Kerley, Dan; Herriot, Glen; Véran, Jean-Pierre

    2014-07-01

    As a part of the trade study for the Narrow Field Infrared Adaptive Optics System, the adaptive optics system for the Thirty Meter Telescope, we investigated the feasibility of performing real-time control computation using a Linux operating system and Intel Xeon E5 CPUs. We also investigated a Xeon Phi based architecture which allows higher levels of parallelism. This paper summarizes both the CPU based real-time controller architecture and the Xeon Phi based RTC. The Intel Xeon E5 CPU solution meets the requirements and performs the computation for one AO cycle in an average of 767 microseconds. The Xeon Phi solution did not meet the 1200 microsecond time requirement and also suffered from unpredictable execution times. More detailed benchmark results are reported for both architectures.

  2. Problematics of Time and Timing in the Longitudinal Study of Human Development: Theoretical and Methodological Issues

    PubMed Central

    Lerner, Richard M.; Schwartz, Seth J; Phelps, Erin

    2009-01-01

    Studying human development involves describing, explaining, and optimizing intraindividual change and interindividual differences in such change and, as such, requires longitudinal research. The selection of the appropriate type of longitudinal design requires selecting the option that best addresses the theoretical questions asked about developmental process and the use of appropriate statistical procedures to best exploit data derived from theory-predicated longitudinal research. This paper focuses on several interrelated problematics involving the treatment of time and the timing of observations that developmental scientists face in creating theory-design fit and in charting in change-sensitive ways developmental processes across life. We discuss ways in which these problematics may be addressed to advance theory-predicated understanding of the role of time in processes of individual development. PMID:19554215

  3. United States Marine Corps Aerial Refueling Requirements Analysis

    DTIC Science & Technology

    2000-12-01

    REFUELING REQUIREMENTS ANALYSIS William R. Gates Systems Management Department Naval Postgraduate School 555 Dyer Road, Room 229 Monterey, CA 93943...refueling customers . KC130s are rotated through the track 24 hours per day, providing customers fuel as needed. KC130 sorties are scheduled to reflect the...projected average customer (aircraft) arrival rates, average service times (time required to engage the drogue, receive fuel and 1075 Report Documentation

  4. Labour time required for piglet castration with isoflurane-anaesthesia using shared and stationary inhaler devices.

    PubMed

    Weber, Sabrina; Das, Gürbüz; Waldmann, Karl-Heinz; Gauly, Matthias

    2014-01-01

    Isoflurane-anaesthesia combined with an analgesic represents a welfare-friendly method of pain mitigation for castration of piglets. However, it requires an inhaler device, which is uneconomic for small farms. Sharing a device among farms may be an economical option if the shared use does not increase labour time and the resulting costs. This study aimed to investigate the amount and components of labour time required for piglet castration with isoflurane anaesthesia performed with stationary and shared devices. Piglets (N = 1579) were anaesthetised with isoflurane (using either stationary or shared devices) and castrated.The stationary devices were used in a group (n = 5) of larger farms (84 sows/farm on an average), whereas smaller farms (n = 7; 32 sows/farm on an average) shared one device. Each farm was visited four times and labour time for each process-step was recorded. The complete process included machine set-up, anaesthesia and castration by a practitioner, and preparation, collection and transport of piglets by a farmer. Labour time of the complete process was increased (P = 0.012) on farms sharing a device (266 s/piglet) compared to farms using stationary devices (177 s/ piglet), due to increased time for preparation (P = 0.055), castration (P = 0.026) and packing (P = 0.010) when sharing a device. However, components of the time budget of farms using stationary or shared devices did not differ significantly (P > 0.05). Cost arising from time spent by farmers did not differ considerably between the use of stationary (0.28 Euro per piglet) and shared (0.26 Euro) devices. It is concluded that costs arising from the increased labour time due to sharing a device can be considered marginal, since the high expenses originating from purchasing an inhaler device are shared among several farms.

  5. Addressing Thermal Model Run Time Concerns of the Wide Field Infrared Survey Telescope using Astrophysics Focused Telescope Assets (WFIRST-AFTA)

    NASA Technical Reports Server (NTRS)

    Peabody, Hume; Guerrero, Sergio; Hawk, John; Rodriguez, Juan; McDonald, Carson; Jackson, Cliff

    2016-01-01

    The Wide Field Infrared Survey Telescope using Astrophysics Focused Telescope Assets (WFIRST-AFTA) utilizes an existing 2.4 m diameter Hubble sized telescope donated from elsewhere in the federal government for near-infrared sky surveys and Exoplanet searches to answer crucial questions about the universe and dark energy. The WFIRST design continues to increase in maturity, detail, and complexity with each design cycle leading to a Mission Concept Review and entrance to the Mission Formulation Phase. Each cycle has required a Structural-Thermal-Optical-Performance (STOP) analysis to ensure the design can meet the stringent pointing and stability requirements. As such, the models have also grown in size and complexity leading to increased model run time. This paper addresses efforts to reduce the run time while still maintaining sufficient accuracy for STOP analyses. A technique was developed to identify slews between observing orientations that were sufficiently different to warrant recalculation of the environmental fluxes to reduce the total number of radiation calculation points. The inclusion of a cryocooler fluid loop in the model also forced smaller time-steps than desired, which greatly increases the overall run time. The analysis of this fluid model required mitigation to drive the run time down by solving portions of the model at different time scales. Lastly, investigations were made into the impact of the removal of small radiation couplings on run time and accuracy. Use of these techniques allowed the models to produce meaningful results within reasonable run times to meet project schedule deadlines.

  6. Geometric multigrid for an implicit-time immersed boundary method

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Guy, Robert D.; Philip, Bobby; Griffith, Boyce E.

    2014-10-12

    The immersed boundary (IB) method is an approach to fluid-structure interaction that uses Lagrangian variables to describe the deformations and resulting forces of the structure and Eulerian variables to describe the motion and forces of the fluid. Explicit time stepping schemes for the IB method require solvers only for Eulerian equations, for which fast Cartesian grid solution methods are available. Such methods are relatively straightforward to develop and are widely used in practice but often require very small time steps to maintain stability. Implicit-time IB methods permit the stable use of large time steps, but efficient implementations of such methodsmore » require significantly more complex solvers that effectively treat both Lagrangian and Eulerian variables simultaneously. Moreover, several different approaches to solving the coupled Lagrangian-Eulerian equations have been proposed, but a complete understanding of this problem is still emerging. This paper presents a geometric multigrid method for an implicit-time discretization of the IB equations. This multigrid scheme uses a generalization of box relaxation that is shown to handle problems in which the physical stiffness of the structure is very large. Numerical examples are provided to illustrate the effectiveness and efficiency of the algorithms described herein. Finally, these tests show that using multigrid as a preconditioner for a Krylov method yields improvements in both robustness and efficiency as compared to using multigrid as a solver. They also demonstrate that with a time step 100–1000 times larger than that permitted by an explicit IB method, the multigrid-preconditioned implicit IB method is approximately 50–200 times more efficient than the explicit method.« less

  7. The Requirements Generation System: A tool for managing mission requirements

    NASA Technical Reports Server (NTRS)

    Sheppard, Sylvia B.

    1994-01-01

    Historically, NASA's cost for developing mission requirements has been a significant part of a mission's budget. Large amounts of time have been allocated in mission schedules for the development and review of requirements by the many groups who are associated with a mission. Additionally, tracing requirements from a current document to a parent document has been time-consuming and costly. The Requirements Generation System (RGS) is a computer-supported cooperative-work tool that assists mission developers in the online creation, review, editing, tracing, and approval of mission requirements as well as in the production of requirements documents. This paper describes the RGS and discusses some lessons learned during its development.

  8. Estimates of the maximum time required to originate life

    NASA Technical Reports Server (NTRS)

    Oberbeck, Verne R.; Fogleman, Guy

    1989-01-01

    Fossils of the oldest microorganisms exist in 3.5 billion year old rocks and there is indirect evidence that life may have existed 3.8 billion years ago (3.8 Ga). Impacts able to destroy life or interrupt prebiotic chemistry may have occurred after 3.5 Ga. If large impactors vaporized the oceans, sterilized the planets, and interfered with the origination of life, life must have originated in the time interval between these impacts which increased with geologic time. Therefore, the maximum time required for the origination of life is the time that occurred between sterilizing impacts just before 3.8 Ga or 3.5 Ga, depending upon when life first appeared on earth. If life first originated 3.5 Ga, and impacts with kinetic energies between 2 x 10 the the 34th and 2 x 10 to the 35th were able to vaporize the oceans, using the most probable impact flux, it is found that the maximum time required to originate life would have been 67 to 133 million years (My). If life originated 3.8 Ga, the maximum time to originate life was 2.5 to 11 My. Using a more conservative estimate for the flux of impacting objects before 3.8 Ga, a maximum time of 25 My was found for the same range of impactor kinetic energies. The impact model suggests that it is possible that life may have originated more than once.

  9. Protection of quality and innovation in radiation oncology: the prospective multicenter trial QUIRO of DEGRO: evaluation of time, attendance of medical staff, and resources during radiotherapy with tomotherapy.

    PubMed

    Winkler, Cornelia; Duma, M N; Popp, W; Sack, H; Budach, V; Molls, M; Kampfer, S

    2014-10-01

    The technical progress in radiotherapy in recent years has been tremendous. This also implies a change of human and time resources. However, there is a lack of data on this topic. Therefore, the DEGRO initiated several studies in the QUIRO project on this subject. The present publication focuses on results for tomotherapy systems and compares them with other IMRT techniques. Over a period of several months, time allocation was documented using a standard form at two university hospitals. The required time for individual steps in the treatment planning process was recorded for all involved professional groups (physicist, technician, and physician) by themselves. The time monitoring at the treatment machines was performed by auxiliary employees (student research assistants). Evaluation of the data was performed for all recorded data as well as by tumor site. A comparison was made between the two involved institutions. A total of 1,691 records were analyzed: 148 from head and neck (H&N) tumors, 460 from prostate cancer, 136 from breast cancer, and 947 from other tumor entities. The mean value of all data from both centers for the definition of the target volumes for H&N tumors took a radiation oncology specialist 75 min, while a physicist needed for the physical treatment planning 214 min. For prostate carcinomas, the times were 60 and 147 min, respectively, and for the group of other entities 63 and 192 min, respectively. For the first radiation treatment, the occupancy time of the linear accelerator room was 31, 26, and 30 min for each entity (H&N, prostate, other entities, respectively). For routine treatments 22, 18, and 21 min were needed for the particular entities. Major differences in the time required for the individual steps were observed between the two centers. This study gives an overview of the time and personnel requirements in radiation therapy using a tomotherapy system. The most representative analysis could be done for the room occupancy times during treatment in both centers. Due to the partly small amount of data and differing planning workflows between the two centers, it is problematic to draw a firm conclusion with regard to planning times. Overall, the time required for the tomotherapy treatment and planning is slightly higher compared to other IMRT techniques.

  10. Isosurface Extraction in Time-Varying Fields Using a Temporal Hierarchical Index Tree

    NASA Technical Reports Server (NTRS)

    Shen, Han-Wei; Gerald-Yamasaki, Michael (Technical Monitor)

    1998-01-01

    Many high-performance isosurface extraction algorithms have been proposed in the past several years as a result of intensive research efforts. When applying these algorithms to large-scale time-varying fields, the storage overhead incurred from storing the search index often becomes overwhelming. this paper proposes an algorithm for locating isosurface cells in time-varying fields. We devise a new data structure, called Temporal Hierarchical Index Tree, which utilizes the temporal coherence that exists in a time-varying field and adoptively coalesces the cells' extreme values over time; the resulting extreme values are then used to create the isosurface cell search index. For a typical time-varying scalar data set, not only does this temporal hierarchical index tree require much less storage space, but also the amount of I/O required to access the indices from the disk at different time steps is substantially reduced. We illustrate the utility and speed of our algorithm with data from several large-scale time-varying CID simulations. Our algorithm can achieve more than 80% of disk-space savings when compared with the existing techniques, while the isosurface extraction time is nearly optimal.

  11. Timing of saccadic eye movements during visual search for multiple targets

    PubMed Central

    Wu, Chia-Chien; Kowler, Eileen

    2013-01-01

    Visual search requires sequences of saccades. Many studies have focused on spatial aspects of saccadic decisions, while relatively few (e.g., Hooge & Erkelens, 1999) consider timing. We studied saccadic timing during search for targets (thin circles containing tilted lines) located among nontargets (thicker circles). Tasks required either (a) estimating the mean tilt of the lines, or (b) looking at targets without a concurrent psychophysical task. The visual similarity of targets and nontargets affected both the probability of hitting a target and the saccade rate in both tasks. Saccadic timing also depended on immediate conditions, specifically, (a) the type of currently fixated location (dwell time was longer on targets than nontargets), (b) the type of goal (dwell time was shorter prior to saccades that hit targets), and (c) the ordinal position of the saccade in the sequence. The results show that timing decisions take into account the difficulty of finding targets, as well as the cost of delays. Timing strategies may be a compromise between the attempt to find and locate targets, or other suitable landing locations, using eccentric vision (at the cost of increased dwell times) versus a strategy of exploring less selectively at a rapid rate. PMID:24049045

  12. Investigation of Cepstrum Analysis for Seismic/Acoustic Signal Sensor Range Determination.

    DTIC Science & Technology

    1981-01-01

    distorted by transmission through a linear system . For example, the effect of multipath and reverberation may be modeled in terms of a signal that is...called the short time averaged cepstrum. To derive some analytical expressions for short time average cepstrums we choose some functions of interest...linear process applied to the time series or any equivalent time function Repiod Period The amount of time required for one cycle of a time series Saphe

  13. Why are You Late?: Investigating the Role of Time Management in Time-Based Prospective Memory

    PubMed Central

    Waldum, Emily R; McDaniel, Mark A.

    2016-01-01

    Time-based prospective memory tasks (TBPM) are those that are to be performed at a specific future time. Contrary to typical laboratory TBPM tasks (e.g., “hit the “z” key every 5 minutes”), many real-world TBPM tasks require more complex time-management processes. For instance to attend an appointment on time, one must estimate the duration of the drive to the appointment and then utilize this estimate to create and execute a secondary TBPM intention (e.g., “I need to start driving by 1:30 to make my 2:00 appointment on time”). Future under- and overestimates of drive time can lead to inefficient TBPM performance with the former lending to missed appointments and the latter to long stints in the waiting room. Despite the common occurrence of complex TBPM tasks in everyday life, to date, no studies have investigated how components of time management, including time estimation, affect behavior in such complex TBPM tasks. Therefore, the current study aimed to investigate timing biases in both older and younger adults and further to determine how such biases along with additional time management components including planning and plan fidelity influence complex TBPM performance. Results suggest for the first time that younger and older adults do not always utilize similar timing strategies, and as a result, can produce differential timing biases under the exact same environmental conditions. These timing biases, in turn, play a vital role in how efficiently both younger and older adults perform a later TBPM task that requires them to utilize their earlier time estimate. PMID:27336325

  14. Implicit time accurate simulation of unsteady flow

    NASA Astrophysics Data System (ADS)

    van Buuren, René; Kuerten, Hans; Geurts, Bernard J.

    2001-03-01

    Implicit time integration was studied in the context of unsteady shock-boundary layer interaction flow. With an explicit second-order Runge-Kutta scheme, a reference solution to compare with the implicit second-order Crank-Nicolson scheme was determined. The time step in the explicit scheme is restricted by both temporal accuracy as well as stability requirements, whereas in the A-stable implicit scheme, the time step has to obey temporal resolution requirements and numerical convergence conditions. The non-linear discrete equations for each time step are solved iteratively by adding a pseudo-time derivative. The quasi-Newton approach is adopted and the linear systems that arise are approximately solved with a symmetric block Gauss-Seidel solver. As a guiding principle for properly setting numerical time integration parameters that yield an efficient time accurate capturing of the solution, the global error caused by the temporal integration is compared with the error resulting from the spatial discretization. Focus is on the sensitivity of properties of the solution in relation to the time step. Numerical simulations show that the time step needed for acceptable accuracy can be considerably larger than the explicit stability time step; typical ratios range from 20 to 80. At large time steps, convergence problems that are closely related to a highly complex structure of the basins of attraction of the iterative method may occur. Copyright

  15. Design of point-of-care (POC) microfluidic medical diagnostic devices

    NASA Astrophysics Data System (ADS)

    Leary, James F.

    2018-02-01

    Design of inexpensive and portable hand-held microfluidic flow/image cytometry devices for initial medical diagnostics at the point of initial patient contact by emergency medical personnel in the field requires careful design in terms of power/weight requirements to allow for realistic portability as a hand-held, point-of-care medical diagnostics device. True portability also requires small micro-pumps for high-throughput capability. Weight/power requirements dictate use of super-bright LEDs and very small silicon photodiodes or nanophotonic sensors that can be powered by batteries. Signal-to-noise characteristics can be greatly improved by appropriately pulsing the LED excitation sources and sampling and subtracting noise in between excitation pulses. The requirements for basic computing, imaging, GPS and basic telecommunications can be simultaneously met by use of smartphone technologies, which become part of the overall device. Software for a user-interface system, limited real-time computing, real-time imaging, and offline data analysis can be accomplished through multi-platform software development systems that are well-suited to a variety of currently available cellphone technologies which already contain all of these capabilities. Microfluidic cytometry requires judicious use of small sample volumes and appropriate statistical sampling by microfluidic cytometry or imaging for adequate statistical significance to permit real-time (typically < 15 minutes) medical decisions for patients at the physician's office or real-time decision making in the field. One or two drops of blood obtained by pin-prick should be able to provide statistically meaningful results for use in making real-time medical decisions without the need for blood fractionation, which is not realistic in the field.

  16. INO340 telescope control system: middleware requirements, design, and evaluation

    NASA Astrophysics Data System (ADS)

    Shalchian, Hengameh; Ravanmehr, Reza

    2016-07-01

    The INO340 Control System (INOCS) is being designed in terms of a distributed real-time architecture. The real-time (soft and firm) nature of many processes inside INOCS causes the communication paradigm between its different components to be time-critical and sensitive. For this purpose, we have chosen the Data Distribution Service (DDS) standard as the communications middleware which is itself based on the publish-subscribe paradigm. In this paper, we review and compare the main middleware types, and then we illustrate the middleware architecture of INOCS and its specific requirements. Finally, we present the experimental results, performed to evaluate our middleware in order to ensure that it meets our requirements.

  17. A real-time recursive filter for the attitude determination of the Spacelab instrument pointing subsystem

    NASA Technical Reports Server (NTRS)

    West, M. E.

    1992-01-01

    A real-time estimation filter which reduces sensitivity to system variations and reduces the amount of preflight computation is developed for the instrument pointing subsystem (IPS). The IPS is a three-axis stabilized platform developed to point various astronomical observation instruments aboard the shuttle. Currently, the IPS utilizes a linearized Kalman filter (LKF), with premission defined gains, to compensate for system drifts and accumulated attitude errors. Since the a priori gains are generated for an expected system, variations result in a suboptimal estimation process. This report compares the performance of three real-time estimation filters with the current LKF implementation. An extended Kalman filter and a second-order Kalman filter are developed to account for the system nonlinearities, while a linear Kalman filter implementation assumes that the nonlinearities are negligible. The performance of each of the four estimation filters are compared with respect to accuracy, stability, settling time, robustness, and computational requirements. It is shown, that for the current IPS pointing requirements, the linear Kalman filter provides improved robustness over the LKF with less computational requirements than the two real-time nonlinear estimation filters.

  18. [Generation of appraisal standards for functional measurements in the frail elderly and persons aged 40 and older requiring light assistance in daily living].

    PubMed

    Obuchi, Shuichi; Kojima, Motonaga; Miki, Akiko; Ito, Kazuhiko; Arai, Takeshi; Tsuji, Ichiro; Okubo, Ichiro; Ohara, Satoko; Sugiyama, Michiko; Suzuki, Takao; Sone, Toshimasa; Yasumura, Seiji

    2010-11-01

    The purpose of this study was to generate appraisal standards for functional measures in independent elderly people with physical frailty, "Tokutei", or persons aged 40 and older who require light assistance, "Youshien". A total of 3,852 subjects for whom functional measures were available, including grasp strength, one-leg standing time, timed up & go (TUG) , and 5-m walking time, were analyzed from a database obtained from the Ministry of Health, Labour and Welfare. The upper limit and lower limit of each quintilededuced from the functional measurements were adopted to construct the appraisal standard. The functional measures were higher in Tokutei than in Youshien. Comparing Tokutei and Yoshien, one or more level difference in the five divided groups was observed for the one-leg standing time. There were differences of three or more levels between Tokutei and Yoshien in the TUG and the 5-m walking time. The present study allowed development of appraisal standards for elderly having physical frailty and for persons aged 40 and older requiring light assistance in daily living.

  19. Alternative nuclear technologies

    NASA Astrophysics Data System (ADS)

    Schubert, E.

    1981-10-01

    The lead times required to develop a select group of nuclear fission reactor types and fuel cycles to the point of readiness for full commercialization are compared. Along with lead times, fuel material requirements and comparative costs of producing electric power were estimated. A conservative approach and consistent criteria for all systems were used in estimates of the steps required and the times involved in developing each technology. The impact of the inevitable exhaustion of the low- or reasonable-cost uranium reserves in the United States on the desirability of completing the breeder reactor program, with its favorable long-term result on fission fuel supplies, is discussed. The long times projected to bring the most advanced alternative converter reactor technologies the heavy water reactor and the high-temperature gas-cooled reactor into commercial deployment when compared to the time projected to bring the breeder reactor into equivalent status suggest that the country's best choice is to develop the breeder. The perceived diversion-proliferation problems with the uranium plutonium fuel cycle have workable solutions that can be developed which will enable the use of those materials at substantially reduced levels of diversion risk.

  20. Analytical solutions to non-Fickian subsurface dispersion in uniform groundwater flow

    USGS Publications Warehouse

    Zou, S.; Xia, J.; Koussis, Antonis D.

    1996-01-01

    Analytical solutions are obtained by the Fourier transform technique for the one-, two-, and three-dimensional transport of a conservative solute injected instantaneously in a uniform groundwater flow. These solutions account for dispersive non-linearity caused by the heterogeneity of the hydraulic properties of aquifer systems and can be used as building blocks to construct solutions by convolution (principle of superposition) for source conditions other than slug injection. The dispersivity is assumed to vary parabolically with time and is thus constant for the entire system at any given time. Two approaches for estimating time-dependent dispersion parameters are developed for two-dimensional plumes. They both require minimal field tracer test data and, therefore, represent useful tools for assessing real-world aquifer contamination sites. The first approach requires mapped plume-area measurements at two specific times after the tracer injection. The second approach requires concentration-versus-time data from two sampling wells through which the plume passes. Detailed examples and comparisons with other procedures show that the methods presented herein are sufficiently accurate and easier to use than other available methods.

  1. A novel recursive Fourier transform for nonuniform sampled signals: application to heart rate variability spectrum estimation.

    PubMed

    Holland, Alexander; Aboy, Mateo

    2009-07-01

    We present a novel method to iteratively calculate discrete Fourier transforms for discrete time signals with sample time intervals that may be widely nonuniform. The proposed recursive Fourier transform (RFT) does not require interpolation of the samples to uniform time intervals, and each iterative transform update of N frequencies has computational order N. Because of the inherent non-uniformity in the time between successive heart beats, an application particularly well suited for this transform is power spectral density (PSD) estimation for heart rate variability. We compare RFT based spectrum estimation with Lomb-Scargle Transform (LST) based estimation. PSD estimation based on the LST also does not require uniform time samples, but the LST has a computational order greater than Nlog(N). We conducted an assessment study involving the analysis of quasi-stationary signals with various levels of randomly missing heart beats. Our results indicate that the RFT leads to comparable estimation performance to the LST with significantly less computational overhead and complexity for applications requiring iterative spectrum estimations.

  2. Robust modular product family design

    NASA Astrophysics Data System (ADS)

    Jiang, Lan; Allada, Venkat

    2001-10-01

    This paper presents a modified Taguchi methodology to improve the robustness of modular product families against changes in customer requirements. The general research questions posed in this paper are: (1) How to effectively design a product family (PF) that is robust enough to accommodate future customer requirements. (2) How far into the future should designers look to design a robust product family? An example of a simplified vacuum product family is used to illustrate our methodology. In the example, customer requirements are selected as signal factors; future changes of customer requirements are selected as noise factors; an index called quality characteristic (QC) is set to evaluate the product vacuum family; and the module instance matrix (M) is selected as control factor. Initially a relation between the objective function (QC) and the control factor (M) is established, and then the feasible M space is systemically explored using a simplex method to determine the optimum M and the corresponding QC values. Next, various noise levels at different time points are introduced into the system. For each noise level, the optimal values of M and QC are computed and plotted on a QC-chart. The tunable time period of the control factor (the module matrix, M) is computed using the QC-chart. The tunable time period represents the maximum time for which a given control factor can be used to satisfy current and future customer needs. Finally, a robustness index is used to break up the tunable time period into suitable time periods that designers should consider while designing product families.

  3. Congenital syphilis investigation processes and timing in Louisiana.

    PubMed

    Bradley, Heather; Gruber, DeAnn; Introcaso, Camille E; Foxhood, Joseph; Wendell, Debbie; Rahman, Mohammad; Ewell, Joy; Kirkcaldy, Robert D; Weinstock, Hillard S

    2014-09-01

    Congenital syphilis (CS) is a potentially life-threatening yet preventable infection. State and local public health jurisdictions conduct investigations of possible CS cases to determine case status and to inform public health prevention efforts. These investigations occur when jurisdictions receive positive syphilis test results from pregnant women or from infants. We extracted data from Louisiana's electronic case management system for 328 infants investigated as possible CS cases in 2010 to 2011. Using date stamps from the case management system, we described CS investigations in terms of processes and timing. Eighty-seven investigations were prompted by positive test results from women who were known to be pregnant by the health jurisdiction, and 241 investigations were prompted by positive syphilis test results from infants. Overall, investigations required a median of 101 days to complete, although 25% were complete within 36 days. Investigations prompted by positive test results from infants required a median of 135 days to complete, and those prompted by positive test results from pregnant women required a median of 41 days. Three times as many CS investigations began with reported positive syphilis test results from infants as from pregnant women, and these investigations required more time to complete. When CS investigations begin after an infant's birth, the opportunity to ensure that women are treated during pregnancy is missed, and surveillance data cannot inform prevention efforts on a timely basis. Consistently ascertaining pregnancy status among women whose positive syphilis test results are reported to public health jurisdictions could help to assure timely CS prevention efforts.

  4. Area, speed and power measurements of FPGA-based complex orthogonal space-time block code channel encoders

    NASA Astrophysics Data System (ADS)

    Passas, Georgios; Freear, Steven; Fawcett, Darren

    2010-01-01

    Space-time coding (STC) is an important milestone in modern wireless communications. In this technique, more copies of the same signal are transmitted through different antennas (space) and different symbol periods (time), to improve the robustness of a wireless system by increasing its diversity gain. STCs are channel coding algorithms that can be readily implemented on a field programmable gate array (FPGA) device. This work provides some figures for the amount of required FPGA hardware resources, the speed that the algorithms can operate and the power consumption requirements of a space-time block code (STBC) encoder. Seven encoder very high-speed integrated circuit hardware description language (VHDL) designs have been coded, synthesised and tested. Each design realises a complex orthogonal space-time block code with a different transmission matrix. All VHDL designs are parameterisable in terms of sample precision. Precisions ranging from 4 bits to 32 bits have been synthesised. Alamouti's STBC encoder design [Alamouti, S.M. (1998), 'A Simple Transmit Diversity Technique for Wireless Communications', IEEE Journal on Selected Areas in Communications, 16:55-108.] proved to be the best trade-off, since it is on average 3.2 times smaller, 1.5 times faster and requires slightly less power than the next best trade-off in the comparison, which is a 3/4-rate full-diversity 3Tx-antenna STBC.

  5. Implementation of a timed, electronic, assessment-driven potassium-replacement protocol.

    PubMed

    Zielenski, Christopher; Crabtree, Adam; Le, Tien; Marlatt, Alyse; Ng, Dana; Tran, Alan

    2017-06-15

    The adherence to and effectiveness and safety of a timed, electronic, assessment-driven potassium-replacement protocol (TARP) were compared with an electronic nurse-driven replacement protocol (NRP) are reported. A retrospective observational study was conducted in a community hospital evaluating protocol adherence, effectiveness, and safety for 2 potassium-replacement protocols. All adults on medical units with an order for potassium replacement per protocol during the 3-month trial periods were reviewed. All patients requiring potassium replacement per protocol were included in the analysis. Adherence to the protocol was assessed by evaluating the dose of potassium administered and performance of reassessments. Effectiveness of the protocol was assessed by evaluating the time to achieve target potassium levels. Safety was assessed by evaluating the route of administration and occurrence of hyperkalemia. A total of 300 patients treated using potassium-replacement protocols required potassium replacement during the study period, with 148 patients in the NRP group requiring 491 instances of potassium replacement. In the TARP group a total of 564 instances requiring potassium replacement corresponded to 152 patients. Of the 491 instances requiring replacement in the NRP group, the correct dose was administered and reassessment performed 117 times (23.8%). Overall adherence ( p < 0.05), correct dose given ( p < 0.05), average time from blood draw to potassium replacement ( p < 0.0001), use of oral replacement ( p < 0.05), and time to achieve target potassium level within 12 hours ( p < 0.05) were significantly improved in the TARP group. The TARP improved the effectiveness and safety of potassium-replacement therapy over the traditional NRP without negatively affecting timeliness of care. Copyright © 2017 by the American Society of Health-System Pharmacists, Inc. All rights reserved.

  6. The impact of involvement of biomedical scientists in specimen dissection and selection of blocks for histopathology: a study of time benefits and specimen handling quality in Ayrshire and Arran area laboratory

    PubMed Central

    Duthie, F R; Nairn, E R; Milne, A W; McTaggart, V; Topping, D

    2004-01-01

    Aims: To assess possible time benefits of specimen dissection by biomedical scientists (BMSs) and the quality of specimen handling by BMSs, in a department where BMSs trim those specimens requiring simple descriptions, from which standard blocks are taken. Methods: Specimen handling by BMSs and consultant pathologists was compared. Time taken for each specimen trimmed was recorded prospectively. To determine specimen handling quality, adherence to dissection standard operating procedures (SOPs) was assessed by recording retrospectively whether or not each action in the SOP had been performed. Information on subsequently required extra levels or blocks was recorded. Results: Analysis of data from 672 specimens trimmed by consultants showed that any given action in the SOPs was performed on average on 60.2% of applicable/assessable specimens; for 660 similar specimens trimmed by BMSs, each action was performed on average on 80.1% of specimens. Of the specimens where data on extra blocks were recorded, extra blocks were required in 3% of those trimmed by pathologists and in 4% of those trimmed by BMSs. Extra levels were required in 12% of those trimmed by pathologists and in 16% of those trimmed by BMSs. BMS trimming saves 16 hours of consultant time each month. The difference between pathologists and BMSs in time for each specimen trimmed is negligible. Conclusions: The advantages of increased adherence to trimming SOPs and saving consultant time outweigh the relatively small number of extra blocks and levels required when BMSs trim. There is no reduction in quality of dissection. PMID:14693831

  7. Real-time estimation of incident delay in dynamic and stochastic networks

    DOT National Transportation Integrated Search

    1997-01-01

    The ability to predict the link travel times is a necessary requirement for most intelligent transportation systems (ITS) applications such as route guidance systems. In an urban traffic environment, these travel times are dynamic and stochastic and ...

  8. Turnover Time

    EPA Science Inventory

    Ecosystems contain energy and materials such as carbon, nitrogen, phosphorus, and water, and are open to their flow-through. Turnover time refers to the amount of time required for replacement by flow-through of the energy or substance of interest contained in the system, and is ...

  9. 26 CFR 5f.103-1 - Obligations issued after December 31, 1982, required to be in registered form.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... particular time if it can be transferred at that time or at any time until its maturity by any means not... period beginning with a later time and ending with the maturity of the obligation, can be transferred... obligation on January 4, 1983 to Bank M provided that (i) Bank M will not at any time transfer any interest...

  10. 26 CFR 5f.103-1 - Obligations issued after December 31, 1982, required to be in registered form.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... particular time if it can be transferred at that time or at any time until its maturity by any means not... period beginning with a later time and ending with the maturity of the obligation, can be transferred... obligation on January 4, 1983 to Bank M provided that (i) Bank M will not at any time transfer any interest...

  11. 26 CFR 5f.103-1 - Obligations issued after December 31, 1982, required to be in registered form.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... particular time if it can be transferred at that time or at any time until its maturity by any means not... period beginning with a later time and ending with the maturity of the obligation, can be transferred... obligation on January 4, 1983 to Bank M provided that (i) Bank M will not at any time transfer any interest...

  12. 26 CFR 5f.103-1 - Obligations issued after December 31, 1982, required to be in registered form.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... particular time if it can be transferred at that time or at any time until its maturity by any means not... period beginning with a later time and ending with the maturity of the obligation, can be transferred... obligation on January 4, 1983 to Bank M provided that (i) Bank M will not at any time transfer any interest...

  13. 26 CFR 5f.103-1 - Obligations issued after December 31, 1982, required to be in registered form.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... particular time if it can be transferred at that time or at any time until its maturity by any means not... period beginning with a later time and ending with the maturity of the obligation, can be transferred... obligation on January 4, 1983 to Bank M provided that (i) Bank M will not at any time transfer any interest...

  14. 45 CFR 1705.4 - Times, places, and requirements for identification of individuals making requests.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 4 2011-10-01 2011-10-01 false Times, places, and requirements for identification of individuals making requests. 1705.4 Section 1705.4 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL COMMISSION ON LIBRARIES AND INFORMATION SCIENCE PRIVACY REGULATIONS § 1705.4...

  15. 45 CFR 1705.4 - Times, places, and requirements for identification of individuals making requests.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false Times, places, and requirements for identification of individuals making requests. 1705.4 Section 1705.4 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL COMMISSION ON LIBRARIES AND INFORMATION SCIENCE PRIVACY REGULATIONS § 1705.4...

  16. 45 CFR 1705.4 - Times, places, and requirements for identification of individuals making requests.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 4 2013-10-01 2013-10-01 false Times, places, and requirements for identification of individuals making requests. 1705.4 Section 1705.4 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL COMMISSION ON LIBRARIES AND INFORMATION SCIENCE PRIVACY REGULATIONS § 1705.4...

  17. 45 CFR 1705.4 - Times, places, and requirements for identification of individuals making requests.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 4 2012-10-01 2012-10-01 false Times, places, and requirements for identification of individuals making requests. 1705.4 Section 1705.4 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL COMMISSION ON LIBRARIES AND INFORMATION SCIENCE PRIVACY REGULATIONS § 1705.4...

  18. 45 CFR 1705.4 - Times, places, and requirements for identification of individuals making requests.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 4 2014-10-01 2014-10-01 false Times, places, and requirements for identification of individuals making requests. 1705.4 Section 1705.4 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL COMMISSION ON LIBRARIES AND INFORMATION SCIENCE PRIVACY REGULATIONS § 1705.4...

  19. 77 FR 13228 - Airworthiness Directives; BAE SYSTEMS (Operations) Limited Airplanes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-06

    ... wing rear spar. This proposed AD would require a one-time detailed inspection for cracks, corrosion, and other defects of the rear face of the wing rear spar, and repair if necessary. We are proposing... above, this [EASA] AD requires a one- time [detailed] inspection [for cracks, corrosion, and other...

  20. 77 FR 36127 - Airworthiness Directives; BAE SYSTEMS (Operations) Limited Airplanes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-18

    ... by reports of cracking found in the wing rear spar. This AD requires a one-time detailed inspection for cracks, corrosion, and other defects of the rear face of the wing rear spar, and repair if...] AD requires a one- time [detailed] inspection [for cracks, corrosion, and other defects] of the rear...

  1. 2 CFR 175.10 - Statutory requirement.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...) under which funding is provided to a private entity, section 106(g) of the TVPA, as amended, requires... period of time that the award is in effect; (b) Procures a commercial sex act during the period of time that the award is in effect; or (c) Uses forced labor in the performance of the award or subawards...

  2. 2 CFR 175.10 - Statutory requirement.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ...) under which funding is provided to a private entity, section 106(g) of the TVPA, as amended, requires... period of time that the award is in effect; (b) Procures a commercial sex act during the period of time that the award is in effect; or (c) Uses forced labor in the performance of the award or subawards...

  3. 78 FR 42323 - Pilot Certification and Qualification Requirements for Air Carrier Operations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-15

    ... sufficient. \\4\\ In addition, military PIC time (up to 500 hours) in a multiengine turbine-powered, fixed-wing... aerodynamic stall (insufficient airflow over the wings). The flightcrew's response to the stall warning system.... Military PIC time in a multiengine turbine-powered, fixed-wing airplane in an operation requiring more than...

  4. 7 CFR 718.10 - Time limitations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... in this title for the performance of any act falls on a Saturday, Sunday, national holiday, State... open for the transaction of business during normal working hours, the time for taking required action shall be extended to the close of business on the next working day. Or in case the action required to be...

  5. Forward collision warning requirements project : refining the CAMP crash alert timing approach by examining "last second" braking and lane change maneuvers under various kinematic conditions

    DOT National Transportation Integrated Search

    2003-01-01

    This final report describes a follow-on study to the previous Crash Avoidance Metrics Partnership (CAMP) human factors work addressing Forward Collision Warning (FCW) timing requirements. This research extends this work by gathering not only "last-se...

  6. 12 CFR 614.4200 - General requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... titles I or II of the Act shall be provided to the borrower at the time of execution and at any time...) Applicants shall be provided notification of the action taken on each credit application in compliance with the requirements of 12 CFR 202.9. (b) Security. (1) Long-term real estate mortgage loans must be...

  7. 48 CFR 252.217-7003 - Changes.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) Drawings, designs, plans, and specifications; (2) Work itemized; (3) Place of performance of the work; (4) Time of commencement or completion of the work; and (5) Any other requirement of the job order. (b) If a change causes an increase or decrease in the cost of, or time required for, performance of the job...

  8. Heat sterilization of wood

    Treesearch

    Xiping Wang

    2010-01-01

    Two important questions should be considered in heat sterilizing solid wood materials: First, what temperature–time regime is required to kill a particular pest? Second, how much time is required to heat the center of any wood configuration to the kill temperature? The entomology research on the first question has facilitated the development of international standards...

  9. Can We Apply TAM in Computer-Based Classes?

    ERIC Educational Resources Information Center

    Williams, David; Williams, Denise

    2013-01-01

    While students may struggle in any classroom and consequently require help beyond the schedule meeting time and place of the class, computer-based courses pose the additional hurdle of requiring ready access to hardware and software that may be unavailable or inconvenient for students outside of the classroom and its scheduled meeting time. This…

  10. 50 CFR 216.125 - Requirements for monitoring and reporting.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... through June), conduct follow-up surveys within 2 weeks of the launch to ensure that there were no adverse... surveys each day that surveys are required that record the species, number of animals, general behavior... following information: (1) Date(s) and time(s) of the launch, (2) Design of the monitoring program, and (3...

  11. 50 CFR 216.125 - Requirements for monitoring and reporting.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... through June), conduct follow-up surveys within 2 weeks of the launch to ensure that there were no adverse... surveys each day that surveys are required that record the species, number of animals, general behavior... following information: (1) Date(s) and time(s) of the launch, (2) Design of the monitoring program, and (3...

  12. 50 CFR 216.125 - Requirements for monitoring and reporting.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... through June), conduct follow-up surveys within 2 weeks of the launch to ensure that there were no adverse... surveys each day that surveys are required that record the species, number of animals, general behavior... following information: (1) Date(s) and time(s) of the launch, (2) Design of the monitoring program, and (3...

  13. 50 CFR 216.125 - Requirements for monitoring and reporting.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... through June), conduct follow-up surveys within 2 weeks of the launch to ensure that there were no adverse... surveys each day that surveys are required that record the species, number of animals, general behavior... following information: (1) Date(s) and time(s) of the launch, (2) Design of the monitoring program, and (3...

  14. 20 CFR Appendix A to Part 602 - Standard for Claim Determinations-Separation Information

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... the unemployment compensation law of such State, and B. The State agency obtains and records in time... State? B. Is the State agency required to obtain, in time for prompt determination of rights to benefits... determinations of rights to benefits? 6013Claim Determinations Requirements Designed To Meet Department of Labor...

  15. 20 CFR Appendix B to Part 625 - Standard for Claim Determinations-Separation Information

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... records in time for the prompt determination and review of benefit claims such information as will... State? B. Is the State agency required to obtain, in time for prompt determination of rights to benefits... determinations of rights to benefits? 6013Claim Determinations Requirements Designed To Meet Department of Labor...

  16. 20 CFR Appendix B to Part 617 - Standard for Claim Determinations-Separation Information

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... agency obtains and records in time for the prompt determination and review of benefit claims such... their rights under the law of the State? B. Is the State agency required to obtain, in time for prompt... in reaching determinations of rights to benefits? 6013Claim Determinations Requirements Designed To...

  17. 20 CFR Appendix A to Part 602 - Standard for Claim Determinations-Separation Information

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... the unemployment compensation law of such State, and B. The State agency obtains and records in time... State? B. Is the State agency required to obtain, in time for prompt determination of rights to benefits... determinations of rights to benefits? 6013Claim Determinations Requirements Designed To Meet Department of Labor...

  18. 20 CFR Appendix B to Part 625 - Standard for Claim Determinations-Separation Information

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... records in time for the prompt determination and review of benefit claims such information as will... State? B. Is the State agency required to obtain, in time for prompt determination of rights to benefits... determinations of rights to benefits? 6013Claim Determinations Requirements Designed To Meet Department of Labor...

  19. 20 CFR Appendix B to Part 617 - Standard for Claim Determinations-Separation Information

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... agency obtains and records in time for the prompt determination and review of benefit claims such... their rights under the law of the State? B. Is the State agency required to obtain, in time for prompt... in reaching determinations of rights to benefits? 6013Claim Determinations Requirements Designed To...

  20. 20 CFR Appendix B to Part 625 - Standard for Claim Determinations-Separation Information

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... records in time for the prompt determination and review of benefit claims such information as will... State? B. Is the State agency required to obtain, in time for prompt determination of rights to benefits... determinations of rights to benefits? 6013Claim Determinations Requirements Designed To Meet Department of Labor...

  1. 20 CFR Appendix A to Part 602 - Standard for Claim Determinations-Separation Information

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... the unemployment compensation law of such State, and B. The State agency obtains and records in time... State? B. Is the State agency required to obtain, in time for prompt determination of rights to benefits... determinations of rights to benefits? 6013Claim Determinations Requirements Designed To Meet Department of Labor...

  2. 20 CFR Appendix B to Part 617 - Standard for Claim Determinations-Separation Information

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... agency obtains and records in time for the prompt determination and review of benefit claims such... their rights under the law of the State? B. Is the State agency required to obtain, in time for prompt... in reaching determinations of rights to benefits? 6013Claim Determinations Requirements Designed To...

  3. 20 CFR Appendix A to Part 602 - Standard for Claim Determinations-Separation Information

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... the unemployment compensation law of such State, and B. The State agency obtains and records in time... State? B. Is the State agency required to obtain, in time for prompt determination of rights to benefits... determinations of rights to benefits? 6013Claim Determinations Requirements Designed To Meet Department of Labor...

  4. 20 CFR Appendix A to Part 602 - Standard for Claim Determinations-Separation Information

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... the unemployment compensation law of such State, and B. The State agency obtains and records in time... State? B. Is the State agency required to obtain, in time for prompt determination of rights to benefits... determinations of rights to benefits? 6013Claim Determinations Requirements Designed To Meet Department of Labor...

  5. 20 CFR Appendix B to Part 625 - Standard for Claim Determinations-Separation Information

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... records in time for the prompt determination and review of benefit claims such information as will... State? B. Is the State agency required to obtain, in time for prompt determination of rights to benefits... determinations of rights to benefits? 6013Claim Determinations Requirements Designed To Meet Department of Labor...

  6. 20 CFR Appendix B to Part 617 - Standard for Claim Determinations-Separation Information

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... agency obtains and records in time for the prompt determination and review of benefit claims such... their rights under the law of the State? B. Is the State agency required to obtain, in time for prompt... in reaching determinations of rights to benefits? 6013Claim Determinations Requirements Designed To...

  7. 20 CFR Appendix B to Part 617 - Standard for Claim Determinations-Separation Information

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... agency obtains and records in time for the prompt determination and review of benefit claims such... their rights under the law of the State? B. Is the State agency required to obtain, in time for prompt... in reaching determinations of rights to benefits? 6013Claim Determinations Requirements Designed To...

  8. 48 CFR 52.216-29 - Time-and-Materials/Labor-Hour Proposal Requirements-Non-Commercial Item Acquisition With Adequate...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...-Hour Proposal Requirements-Non-Commercial Item Acquisition With Adequate Price Competition. 52.216-29... Proposal Requirements—Non-Commercial Item Acquisition With Adequate Price Competition (FEB 2007) (a) The... Time-and-Materials/Labor-Hour Proposal Requirements—Non-Commercial Item Acquisition With Adequate Price...

  9. Global trends

    NASA Technical Reports Server (NTRS)

    Megie, G.; Chanin, M.-L.; Ehhalt, D.; Fraser, P.; Frederick, J. F.; Gille, J. C.; Mccormick, M. P.; Schoebert, M.; Bishop, L.; Bojkov, R. D.

    1990-01-01

    Measuring trends in ozone, and most other geophysical variables, requires that a small systematic change with time be determined from signals that have large periodic and aperiodic variations. Their time scales range from the day-to-day changes due to atmospheric motions through seasonal and annual variations to 11 year cycles resulting from changes in the sun UV output. Because of the magnitude of all of these variations is not well known and highly variable, it is necessary to measure over more than one period of the variations to remove their effects. This means that at least 2 or more times the 11 year sunspot cycle. Thus, the first requirement is for a long term data record. The second related requirement is that the record be consistent. A third requirement is for reasonable global sampling, to ensure that the effects are representative of the entire Earth. The various observational methods relevant to trend detection are reviewed to characterize their quality and time and space coverage. Available data are then examined for long term trends or recent changes in ozone total content and vertical distribution, as well as related parameters such as stratospheric temperature, source gases and aerosols.

  10. Design and preliminary assessment of Vanderbilt hand exoskeleton.

    PubMed

    Gasser, Benjamin W; Bennett, Daniel A; Durrough, Christina M; Goldfarb, Michael

    2017-07-01

    This paper presents the design of a hand exoskeleton intended to enable or facilitate bimanual activities of daily living (ADLs) for individuals with chronic upper extremity hemiparesis resulting from stroke. The paper describes design of the battery-powered, self-contained exoskeleton and presents the results of initial testing with a single subject with hemiparesis from stroke. Specifically, an experiment was conducted requiring the subject to repeatedly remove the lid from a water bottle both with and without the hand exoskeleton. The relative times required to remove the lid from the bottles was considerably lower when using the exoskeleton. Specifically, the average amount of time required to grasp the bottle with the paretic hand without the exoskeleton was 25.9 s, with a standard deviation of 33.5 s, while the corresponding average amount of time required to grasp the bottle with the exoskeleton was 5.1 s, with a standard deviation of 1.9 s. Thus, the task time involving the paretic hand was reduced by a factor of five, while the standard deviation was reduced by a factor of 16.

  11. Pre- and post-head processing for single- and double-scrambled sentences of a head-final language as measured by the eye tracking method.

    PubMed

    Tamaoka, Katsuo; Asano, Michiko; Miyaoka, Yayoi; Yokosawa, Kazuhiko

    2014-04-01

    Using the eye-tracking method, the present study depicted pre- and post-head processing for simple scrambled sentences of head-final languages. Three versions of simple Japanese active sentences with ditransitive verbs were used: namely, (1) SO₁O₂V canonical, (2) SO₂O₁V single-scrambled, and (3) O₁O₂SV double-scrambled order. First pass reading times indicated that the third noun phrase just before the verb in both single- and double-scrambled sentences required longer reading times compared to canonical sentences. Re-reading times (the sum of all fixations minus the first pass reading) showed that all noun phrases including the crucial phrase before the verb in double-scrambled sentences required longer re-reading times than those required for single-scrambled sentences; single-scrambled sentences had no difference from canonical ones. Therefore, a single filler-gap dependency can be resolved in pre-head anticipatory processing whereas two filler-gap dependencies require much greater cognitive loading than a single case. These two dependencies can be resolved in post-head processing using verb agreement information.

  12. Competitive On-Line Scheduling for Overloaded Real-Time Systems

    DTIC Science & Technology

    1993-09-01

    Real - Time Systems by Gilad Koren a dissertation submitted in partial fulfillment of the requirements...Overloaded Real - Time Systems 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK...1.1 Introduction : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : 2 1.1.1 Real - Time Systems : : : : : : : : : : : : : : : : : : : : : : : : : : : :

  13. 26 CFR 1.6161-1 - Extension of time for paying tax or deficiency.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... tax is required to be paid to the Director of International Operations, such application must be filed... 26 Internal Revenue 13 2010-04-01 2010-04-01 false Extension of time for paying tax or deficiency... (CONTINUED) INCOME TAX (CONTINUED) INCOME TAXES Extensions of Time for Payment § 1.6161-1 Extension of time...

  14. 22 CFR 401.19 - Reducing or extending time and dispensing with statements.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 22 Foreign Relations 2 2012-04-01 2009-04-01 true Reducing or extending time and dispensing with... RULES OF PROCEDURE Applications § 401.19 Reducing or extending time and dispensing with statements. In... Commission may reduce or extend the time for the presentation of any paper or the doing of any act required...

  15. 14 CFR 91.1059 - Flight time limitations and rest requirements: One or two pilot crews.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Rest 10 Hours 12 Hours. (6) Minimum After Duty Rest Period for Multi-Time Zone Flights 14 Hours 18... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Flight time limitations and rest... OPERATING AND FLIGHT RULES Fractional Ownership Operations Program Management § 91.1059 Flight time...

  16. 39 CFR 966.6 - Filing, docketing and serving documents; computation of time; representation of parties.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... are between 8:45 a.m. and 4:45 p.m., eastern standard or daylight saving time as appropriate during...; computation of time; representation of parties. 966.6 Section 966.6 Postal Service UNITED STATES POSTAL... time; representation of parties. (a) Filing. All documents required under this part must be filed by...

  17. 39 CFR 966.6 - Filing, docketing and serving documents; computation of time; representation of parties.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... are between 8:45 a.m. and 4:45 p.m., eastern standard or daylight saving time as appropriate during...; computation of time; representation of parties. 966.6 Section 966.6 Postal Service UNITED STATES POSTAL... time; representation of parties. (a) Filing. All documents required under this part must be filed by...

  18. 75 FR 44763 - Certain Circular Welded Non-Alloy Steel Pipe From Mexico; Extension of Time Limit for Preliminary...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-29

    ...-Alloy Steel Pipe From Mexico; Extension of Time Limit for Preliminary Results of Antidumping Duty... review of the antidumping duty order on certain circular welded non- alloy steel pipe from Mexico. We... preliminary results of this review within the original time frame because we require additional time with...

  19. How Much Time Is Required for Using Evaluation Results?

    ERIC Educational Resources Information Center

    Flores, Rebecca; Roecks, Alan

    The activities and procedures for Education Service Center, Region 20, Evaluation Services' time accounting system are described. Each individual in the evaluation component at the end of the working day records his or her time spent on an activity. This is done through the use of the time accounting form which is completed and turned in weekly to…

  20. 26 CFR 1.132-8T - Nondiscrimination rules-1985 through 1988 (temporary).

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... classification that is based on factors such as seniority, full-time vs. part-time employment, or job description... made available to employees each year) or because of the nature of the fringe benefit (such as where an...-same-terms requirement. Therefore, an allocation based on seniority, full-time vs. part-time employment...

Top