46 CFR 183.392 - Radiotelephone installations.
Code of Federal Regulations, 2011 CFR
2011-10-01
... TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.392 Radiotelephone installations. A separate circuit, with overcurrent protection at the main distribution panel, must be provided...
46 CFR 183.392 - Radiotelephone installations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.392 Radiotelephone installations. A separate circuit, with overcurrent protection at the main distribution panel, must be provided...
46 CFR 183.392 - Radiotelephone installations.
Code of Federal Regulations, 2013 CFR
2013-10-01
... TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.392 Radiotelephone installations. A separate circuit, with overcurrent protection at the main distribution panel, must be provided...
46 CFR 169.673 - Installation of wiring for power and lighting circuits.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 7 2010-10-01 2010-10-01 false Installation of wiring for power and lighting circuits... SCHOOLS SAILING SCHOOL VESSELS Machinery and Electrical Electrical Installations Operating at Potentials of Less Than 50 Volts on Vessels of Less Than 100 Gross Tons § 169.673 Installation of wiring for...
46 CFR 129.315 - Power sources for OSVs of 100 or more gross tons.
Code of Federal Regulations, 2013 CFR
2013-10-01
... VESSELS ELECTRICAL INSTALLATIONS Power Sources and Distribution Systems § 129.315 Power sources for OSVs... 46 Shipping 4 2013-10-01 2013-10-01 false Power sources for OSVs of 100 or more gross tons. 129....10 of this chapter. (b) If a generator provides electrical power for any system identified as a vital...
46 CFR 129.315 - Power sources for OSVs of 100 or more gross tons.
Code of Federal Regulations, 2011 CFR
2011-10-01
... VESSELS ELECTRICAL INSTALLATIONS Power Sources and Distribution Systems § 129.315 Power sources for OSVs... 46 Shipping 4 2011-10-01 2011-10-01 false Power sources for OSVs of 100 or more gross tons. 129....10 of this chapter. (b) If a generator provides electrical power for any system identified as a vital...
46 CFR 129.315 - Power sources for OSVs of 100 or more gross tons.
Code of Federal Regulations, 2012 CFR
2012-10-01
... VESSELS ELECTRICAL INSTALLATIONS Power Sources and Distribution Systems § 129.315 Power sources for OSVs... 46 Shipping 4 2012-10-01 2012-10-01 false Power sources for OSVs of 100 or more gross tons. 129....10 of this chapter. (b) If a generator provides electrical power for any system identified as a vital...
46 CFR 183.200 - General design, installation, and maintenance requirements.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 7 2012-10-01 2012-10-01 false General design, installation, and maintenance requirements. 183.200 Section 183.200 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION General Requirements § 183.200 General design, installation, and maintenance...
46 CFR 183.200 - General design, installation, and maintenance requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 7 2010-10-01 2010-10-01 false General design, installation, and maintenance requirements. 183.200 Section 183.200 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION General Requirements § 183.200 General design, installation, and maintenance...
46 CFR 183.200 - General design, installation, and maintenance requirements.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 7 2013-10-01 2013-10-01 false General design, installation, and maintenance requirements. 183.200 Section 183.200 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION General Requirements § 183.200 General design, installation, and maintenance...
46 CFR 183.200 - General design, installation, and maintenance requirements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 7 2014-10-01 2014-10-01 false General design, installation, and maintenance requirements. 183.200 Section 183.200 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION General Requirements § 183.200 General design, installation, and maintenance...
46 CFR 183.330 - Distribution panels and switchboards.
Code of Federal Regulations, 2010 CFR
2010-10-01
... (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.330... vessel's wiring, must not have any electrically unshielded or uninsulated surfaces. (j) Switchboards and...
46 CFR 169.669 - Radiotelephone equipment.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Machinery and Electrical Electrical Installations Operating at Potentials of Less Than 50 Volts on Vessels of Less Than 100 Gross Tons § 169.669 Radiotelephone equipment. A separate circuit from the...
46 CFR 169.676 - Grounded electrical systems.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 7 2013-10-01 2013-10-01 false Grounded electrical systems. 169.676 Section 169.676... Machinery and Electrical Electrical Installations Operating at Potentials of 50 Volts Or More on Vessels of Less Than 100 Gross Tons § 169.676 Grounded electrical systems. (a) Except as provided in paragraph (b...
46 CFR 169.676 - Grounded electrical systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 7 2010-10-01 2010-10-01 false Grounded electrical systems. 169.676 Section 169.676... Machinery and Electrical Electrical Installations Operating at Potentials of 50 Volts Or More on Vessels of Less Than 100 Gross Tons § 169.676 Grounded electrical systems. (a) Except as provided in paragraph (b...
46 CFR 169.676 - Grounded electrical systems.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 7 2012-10-01 2012-10-01 false Grounded electrical systems. 169.676 Section 169.676... Machinery and Electrical Electrical Installations Operating at Potentials of 50 Volts Or More on Vessels of Less Than 100 Gross Tons § 169.676 Grounded electrical systems. (a) Except as provided in paragraph (b...
46 CFR 169.676 - Grounded electrical systems.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 7 2014-10-01 2014-10-01 false Grounded electrical systems. 169.676 Section 169.676... Machinery and Electrical Electrical Installations Operating at Potentials of 50 Volts Or More on Vessels of Less Than 100 Gross Tons § 169.676 Grounded electrical systems. (a) Except as provided in paragraph (b...
46 CFR 169.676 - Grounded electrical systems.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 7 2011-10-01 2011-10-01 false Grounded electrical systems. 169.676 Section 169.676... Machinery and Electrical Electrical Installations Operating at Potentials of 50 Volts Or More on Vessels of Less Than 100 Gross Tons § 169.676 Grounded electrical systems. (a) Except as provided in paragraph (b...
46 CFR 169.692 - Remote stop stations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Machinery and Electrical Electrical Installations on Vessels of 100 Gross Tons and Over § 169.692 Remote... propulsion unit, (b) A bilge slop or dirty oil discharge shutdown at the deck discharge, (c) A ventilation...
46 CFR 183.230 - Temperature ratings.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 7 2013-10-01 2013-10-01 false Temperature ratings. 183.230 Section 183.230 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION General Requirements § 183.230 Temperature ratings. Temperature ratings of electrical...
46 CFR 183.230 - Temperature ratings.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 7 2010-10-01 2010-10-01 false Temperature ratings. 183.230 Section 183.230 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION General Requirements § 183.230 Temperature ratings. Temperature ratings of electrical...
46 CFR 183.230 - Temperature ratings.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 7 2011-10-01 2011-10-01 false Temperature ratings. 183.230 Section 183.230 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION General Requirements § 183.230 Temperature ratings. Temperature ratings of electrical...
46 CFR 183.230 - Temperature ratings.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 7 2014-10-01 2014-10-01 false Temperature ratings. 183.230 Section 183.230 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION General Requirements § 183.230 Temperature ratings. Temperature ratings of electrical...
46 CFR 183.230 - Temperature ratings.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 7 2012-10-01 2012-10-01 false Temperature ratings. 183.230 Section 183.230 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION General Requirements § 183.230 Temperature ratings. Temperature ratings of electrical...
46 CFR 183.324 - Dual voltage generators.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 7 2010-10-01 2010-10-01 false Dual voltage generators. 183.324 Section 183.324... TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.324 Dual voltage generators. (a) A dual voltage generator installed on a vessel shall be of the grounded type, where: (1) The...
46 CFR 169.688 - Power supply.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 7 2010-10-01 2010-10-01 false Power supply. 169.688 Section 169.688 Shipping COAST... Electrical Electrical Installations on Vessels of 100 Gross Tons and Over § 169.688 Power supply. (a) The... provide electric power for any vital system listed in § 169.642 of this subchapter, at least two...
46 CFR 169.688 - Power supply.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 7 2011-10-01 2011-10-01 false Power supply. 169.688 Section 169.688 Shipping COAST... Electrical Electrical Installations on Vessels of 100 Gross Tons and Over § 169.688 Power supply. (a) The... provide electric power for any vital system listed in § 169.642 of this subchapter, at least two...
46 CFR 183.520 - Lifeboat winches.
Code of Federal Regulations, 2010 CFR
2010-10-01
... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION Miscellaneous Systems and Requirements § 183.520 Lifeboat winches. Each electric power operated lifeboat winch must meet, 111.95 in subchapter J and § 160.015 in subchapter Q of this...
46 CFR 182.480 - Flammable vapor detection systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 100 GROSS TONS) MACHINERY INSTALLATION Specific Machinery Requirements § 182.480 Flammable vapor... permit calibration in a vapor free atmosphere. (g) Electrical connections, wiring, and components for a...
46 CFR 169.693 - Engine order telegraph systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 7 2010-10-01 2010-10-01 false Engine order telegraph systems. 169.693 Section 169.693... Machinery and Electrical Electrical Installations on Vessels of 100 Gross Tons and Over § 169.693 Engine order telegraph systems. An engine order telegraph system is not required. ...
46 CFR 169.693 - Engine order telegraph systems.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 7 2013-10-01 2013-10-01 false Engine order telegraph systems. 169.693 Section 169.693... Machinery and Electrical Electrical Installations on Vessels of 100 Gross Tons and Over § 169.693 Engine order telegraph systems. An engine order telegraph system is not required. ...
46 CFR 169.693 - Engine order telegraph systems.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 7 2012-10-01 2012-10-01 false Engine order telegraph systems. 169.693 Section 169.693... Machinery and Electrical Electrical Installations on Vessels of 100 Gross Tons and Over § 169.693 Engine order telegraph systems. An engine order telegraph system is not required. ...
46 CFR 169.693 - Engine order telegraph systems.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 7 2011-10-01 2011-10-01 false Engine order telegraph systems. 169.693 Section 169.693... Machinery and Electrical Electrical Installations on Vessels of 100 Gross Tons and Over § 169.693 Engine order telegraph systems. An engine order telegraph system is not required. ...
46 CFR 169.693 - Engine order telegraph systems.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 7 2014-10-01 2014-10-01 false Engine order telegraph systems. 169.693 Section 169.693... Machinery and Electrical Electrical Installations on Vessels of 100 Gross Tons and Over § 169.693 Engine order telegraph systems. An engine order telegraph system is not required. ...
46 CFR 169.688 - Power supply.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 7 2014-10-01 2014-10-01 false Power supply. 169.688 Section 169.688 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS SAILING SCHOOL VESSELS Machinery and Electrical Electrical Installations on Vessels of 100 Gross Tons and Over § 169.688 Power supply. (a) The...
46 CFR 169.688 - Power supply.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 7 2013-10-01 2013-10-01 false Power supply. 169.688 Section 169.688 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS SAILING SCHOOL VESSELS Machinery and Electrical Electrical Installations on Vessels of 100 Gross Tons and Over § 169.688 Power supply. (a) The...
46 CFR 169.688 - Power supply.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 7 2012-10-01 2012-10-01 false Power supply. 169.688 Section 169.688 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS SAILING SCHOOL VESSELS Machinery and Electrical Electrical Installations on Vessels of 100 Gross Tons and Over § 169.688 Power supply. (a) The...
46 CFR 169.690 - Lighting branch circuits.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 7 2010-10-01 2010-10-01 false Lighting branch circuits. 169.690 Section 169.690... Machinery and Electrical Electrical Installations on Vessels of 100 Gross Tons and Over § 169.690 Lighting branch circuits. Each lighting branch circuit must meet the requirements of § 111.75-5 of this chapter...
46 CFR 169.672 - Wiring for power and lighting circuits.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 7 2010-10-01 2010-10-01 false Wiring for power and lighting circuits. 169.672 Section... SCHOOL VESSELS Machinery and Electrical Electrical Installations Operating at Potentials of Less Than 50 Volts on Vessels of Less Than 100 Gross Tons § 169.672 Wiring for power and lighting circuits. (a...
46 CFR 169.679 - Wiring for power and lighting circuits.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 7 2010-10-01 2010-10-01 false Wiring for power and lighting circuits. 169.679 Section... SCHOOL VESSELS Machinery and Electrical Electrical Installations Operating at Potentials of 50 Volts Or More on Vessels of Less Than 100 Gross Tons § 169.679 Wiring for power and lighting circuits. Wiring...
46 CFR 169.679 - Wiring for power and lighting circuits.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 7 2014-10-01 2014-10-01 false Wiring for power and lighting circuits. 169.679 Section... SCHOOL VESSELS Machinery and Electrical Electrical Installations Operating at Potentials of 50 Volts Or More on Vessels of Less Than 100 Gross Tons § 169.679 Wiring for power and lighting circuits. Wiring...
46 CFR 169.679 - Wiring for power and lighting circuits.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 7 2011-10-01 2011-10-01 false Wiring for power and lighting circuits. 169.679 Section... SCHOOL VESSELS Machinery and Electrical Electrical Installations Operating at Potentials of 50 Volts Or More on Vessels of Less Than 100 Gross Tons § 169.679 Wiring for power and lighting circuits. Wiring...
46 CFR 169.679 - Wiring for power and lighting circuits.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 7 2012-10-01 2012-10-01 false Wiring for power and lighting circuits. 169.679 Section... SCHOOL VESSELS Machinery and Electrical Electrical Installations Operating at Potentials of 50 Volts Or More on Vessels of Less Than 100 Gross Tons § 169.679 Wiring for power and lighting circuits. Wiring...
46 CFR 169.679 - Wiring for power and lighting circuits.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 7 2013-10-01 2013-10-01 false Wiring for power and lighting circuits. 169.679 Section... SCHOOL VESSELS Machinery and Electrical Electrical Installations Operating at Potentials of 50 Volts Or More on Vessels of Less Than 100 Gross Tons § 169.679 Wiring for power and lighting circuits. Wiring...
46 CFR 169.672 - Wiring for power and lighting circuits.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 7 2012-10-01 2012-10-01 false Wiring for power and lighting circuits. 169.672 Section... SCHOOL VESSELS Machinery and Electrical Electrical Installations Operating at Potentials of Less Than 50 Volts on Vessels of Less Than 100 Gross Tons § 169.672 Wiring for power and lighting circuits. (a...
46 CFR 129.540 - Remote stopping-systems on OSVs of 100 or more gross tons.
Code of Federal Regulations, 2010 CFR
2010-10-01
...) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS Miscellaneous Electrical Systems § 129.540 Remote stopping... subpart 111.103 of this chapter: (1) For each propulsion unit, in the pilothouse. (2) For each discharge pump for bilge slop or dirty oil, at the deck discharge. (3) For each powered ventilation system...
46 CFR 183.370 - General grounding requirements.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 7 2012-10-01 2012-10-01 false General grounding requirements. 183.370 Section 183.370 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.370 General grounding...
46 CFR 183.378 - Ungrounded systems.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 7 2013-10-01 2013-10-01 false Ungrounded systems. 183.378 Section 183.378 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.378 Ungrounded systems. Each ungrounded...
46 CFR 183.378 - Ungrounded systems.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 7 2011-10-01 2011-10-01 false Ungrounded systems. 183.378 Section 183.378 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.378 Ungrounded systems. Each ungrounded...
46 CFR 183.360 - Semiconductor rectifier systems.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 7 2014-10-01 2014-10-01 false Semiconductor rectifier systems. 183.360 Section 183.360 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.360 Semiconductor rectifier...
46 CFR 183.324 - Dual voltage generators.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 7 2013-10-01 2013-10-01 false Dual voltage generators. 183.324 Section 183.324 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.324 Dual voltage generators...
46 CFR 183.360 - Semiconductor rectifier systems.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 7 2012-10-01 2012-10-01 false Semiconductor rectifier systems. 183.360 Section 183.360 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.360 Semiconductor rectifier...
46 CFR 183.324 - Dual voltage generators.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 7 2011-10-01 2011-10-01 false Dual voltage generators. 183.324 Section 183.324 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.324 Dual voltage generators...
46 CFR 183.324 - Dual voltage generators.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 7 2014-10-01 2014-10-01 false Dual voltage generators. 183.324 Section 183.324 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.324 Dual voltage generators...
46 CFR 183.324 - Dual voltage generators.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 7 2012-10-01 2012-10-01 false Dual voltage generators. 183.324 Section 183.324 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.324 Dual voltage generators...
46 CFR 183.360 - Semiconductor rectifier systems.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 7 2013-10-01 2013-10-01 false Semiconductor rectifier systems. 183.360 Section 183.360 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.360 Semiconductor rectifier...
46 CFR 183.370 - General grounding requirements.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 7 2013-10-01 2013-10-01 false General grounding requirements. 183.370 Section 183.370 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.370 General grounding...
46 CFR 183.360 - Semiconductor rectifier systems.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 7 2011-10-01 2011-10-01 false Semiconductor rectifier systems. 183.360 Section 183.360... TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.360 Semiconductor rectifier systems. (a) Each semiconductor rectifier system must have an adequate heat removal system that prevents...
46 CFR 183.360 - Semiconductor rectifier systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 7 2010-10-01 2010-10-01 false Semiconductor rectifier systems. 183.360 Section 183.360... TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.360 Semiconductor rectifier systems. (a) Each semiconductor rectifier system must have an adequate heat removal system that prevents...
46 CFR 183.320 - Generators and motors.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 7 2013-10-01 2013-10-01 false Generators and motors. 183.320 Section 183.320 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.320 Generators and motors. (a) Each...
46 CFR 183.320 - Generators and motors.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 7 2010-10-01 2010-10-01 false Generators and motors. 183.320 Section 183.320 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.320 Generators and motors. (a) Each...
46 CFR 183.320 - Generators and motors.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 7 2014-10-01 2014-10-01 false Generators and motors. 183.320 Section 183.320 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.320 Generators and motors. (a) Each...
46 CFR 183.372 - Equipment and conductor grounding.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 7 2013-10-01 2013-10-01 false Equipment and conductor grounding. 183.372 Section 183.372 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.372 Equipment and...
46 CFR 183.320 - Generators and motors.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 7 2011-10-01 2011-10-01 false Generators and motors. 183.320 Section 183.320 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.320 Generators and motors. (a) Each...
46 CFR 183.320 - Generators and motors.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 7 2012-10-01 2012-10-01 false Generators and motors. 183.320 Section 183.320 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.320 Generators and motors. (a) Each...
46 CFR 183.130 - Alternative standards.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 7 2010-10-01 2010-10-01 false Alternative standards. 183.130 Section 183.130 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION General Provisions § 183.130 Alternative standards. (a) A vessel, other than a high...
Residential Solar PV Systems in the Carolinas: Opportunities and Outcomes.
Alqahtani, Bandar Jubran; Holt, Kyra Moore; Patiño-Echeverri, Dalia; Pratson, Lincoln
2016-02-16
This paper presents a first-order analysis of the feasibility and technical, environmental, and economic effects of large levels of solar photovoltaic (PV) penetration within the services areas of the Duke Energy Carolinas (DEC) and Duke Energy Progress (DEP). A PV production model based on household density and a gridded hourly global horizontal irradiance data set simulates hourly PV power output from roof-top installations, while a unit commitment and real-time economic dispatch (UC-ED) model simulates hourly system operations. We find that the large generating capacity of base-load nuclear power plants (NPPs) without ramping capability in the region limits PV integration levels to 5.3% (6510 MW) of 2015 generation. Enabling ramping capability for NPPs would raise the limit of PV penetration to near 9% of electricity generated. If the planned retirement of coal-fired power plants together with new installations and upgrades of natural gas and nuclear plants materialize in 2025, and if NPPs operate flexibly, then the share of coal-fired electricity will be reduced from 37% to 22%. A 9% penetration of electricity from PV would further reduce the share of coal-fired electricity by 4-6% resulting in a system-wide CO2 emissions rate of 0.33 to 0.40 tons/MWh and associated abatement costs of 225-415 (2015$ per ton).
46 CFR 183.376 - Grounded distribution systems (neutral grounded).
Code of Federal Regulations, 2013 CFR
2013-10-01
... VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.376... propulsion, power, lighting, or distribution system having a neutral bus or conductor must have the neutral... 46 Shipping 7 2013-10-01 2013-10-01 false Grounded distribution systems (neutral grounded). 183...
A Demonstration System for Capturing Geothermal Energy from Mine Waters beneath Butte, Montana
DOE Office of Scientific and Technical Information (OSTI.GOV)
Blackketter, Donald
2015-06-01
Executive Summary An innovative 50-ton ground-source heat pump (GSHP) system was installed to provide space heating and cooling for a 56,000 square foot (5,200 square meter) building in Butte Montana, in conjunction with its heating and chiller systems. Butte is a location with winter conditions much colder than the national average. The GSHP uses flooded mine waters at 78F (25C) as the heat source and heat sink. The heat transfer performance and efficiency of the system were analyzed using data from January through July 2014. This analysis indicated that for typical winter conditions in Butte, Montana, the GSHP could delivermore » about 88% of the building’s annual heating needs. Compared with a baseline natural-gas/electric system, the system demonstrated at least 69% site energy savings, 38% source energy savings, 39% carbon dioxide emissions reduction, and a savings of $17,000 per year (40%) in utility costs. Assuming a $10,000 per ton cost for installing a production system, the payback period at natural gas costs of $9.63/MMBtu and electricity costs of $0.08/kWh would be in the range of 40 to 50 years. At higher utility prices, or lower installation costs, the payback period would obviously be reduced.« less
Solar Thermal Demonstration Project
DOE Office of Scientific and Technical Information (OSTI.GOV)
Biesinger, K; Cuppett, D; Dyer, D
2012-01-30
HVAC Retrofit and Energy Efficiency Upgrades at Clark High School, Las Vegas, Nevada The overall objectives of this project are to increase usage of alternative/renewable fuels, create a better and more reliable learning environment for the students, and reduce energy costs. Utilizing the grant resources and local bond revenues, the District proposes to reduce electricity consumption by installing within the existing limited space, one principal energy efficient 100 ton adsorption chiller working in concert with two 500 ton electric chillers. The main heating source will be primarily from low nitrogen oxide (NOX), high efficiency natural gas fired boilers. With themore » use of this type of chiller, the electric power and cost requirements will be greatly reduced. To provide cooling to the information technology centers and equipment rooms of the school during off-peak hours, the District will install water source heat pumps. In another measure to reduce the cooling requirements at Clark High School, the District will replace single pane glass and metal panels with Kalwall building panels. An added feature of the Kalwall system is that it will allow for natural day lighting in the student center. This system will significantly reduce thermal heat/cooling loss and control solar heat gain, thus delivering significant savings in heating ventilation and air conditioning (HVAC) costs.« less
46 CFR 129.315 - Power sources for OSVs of 100 or more gross tons.
Code of Federal Regulations, 2010 CFR
2010-10-01
... VESSELS ELECTRICAL INSTALLATIONS Power Sources and Distribution Systems § 129.315 Power sources for OSVs... one set must be independent of the main propulsion plant. A generator not independent of the main propulsion plant must comply with § 111.10-4(d) of this chapter. With any one generating set stopped, the...
NASA Technical Reports Server (NTRS)
1980-01-01
The solar system was designed to provide 47 percent of the space heating, 8,800 square feet area and 75 percent of the domestic hot water (DHW) load. The solar system consists of 2,808 square feet of Solaron, model 2001, air, flat plate collector subsystem, a concrete box storage subsystem which contains 1,428 cubic feet of 0.5 inch diameter pebbles weighing 71.5 tons, a DHW preheat tank, blowers, pumps, heat exchangers, air ducting, controls and associated plumbing. Two 120 gallon electric DHW heaters supply domestic hot water which is preheated by the solar system. Auxiliary space heating is provided by three electric heat pumps with electric resistance heaters and four 30 kilowatt electric unit heaters. There are six modes of system operation.
Kunetz, Thomas E; Fink-Finowicki, Jarek; McGowan, Steve; Auerbach, Eric
2012-01-01
The Metropolitan Water Reclamation District (MWRD) of Greater Chicago's Stickney Water Reclamation Plant (SWRP) anaerobically digests approximately 430 dry tons per day (dtpd) (390 dry metric tons per day) of solids and produces 3.4 million ft(3)/day (96 thousand m(3)/day) of biogas from the anaerobic digesters, making it one of the largest municipal digester gas complexes in the world. Installation of new treatment processes, as well as future increases in flows and loads to the plant, are expected to significantly increase production of biologically degradable sludge and biogas. This paper presents a comprehensive planning study that was completed to identify and evaluate alternatives for utilization of this biogas. The best, sustainable approach was identified, taking into consideration economics, social impacts, and environmental impacts. The model results indicate that the most economically favorable scenario involves installing a cogeneration facility to produce electricity on-site, and operating it in conjunction with the plant's existing boilers to satisfy the heating needs of the plant. This scenario also provides the greatest reduction in GHG offsets at the power plants.
2013-12-01
capacities ranging from 3-330 tons using silica gel or 250-450 tons using zeolite desiccant. Adsorption chillers are also currently manufactured by...Mayekawa (20-100 tons using zeolite desiccant) • Union (10-125 tons using silica gel) Sortech - 2 ton units for residential use • InvenSor - 3 ton
Lu, Xi; McElroy, Michael B; Chen, Xinyu; Kang, Chongqing
2014-12-16
Although capacity credits for wind power have been embodied in power systems in the U.S. and Europe, the current planning framework for electricity in China continues to treat wind power as a nondispatchable source with zero contribution to firm capacity. This study adopts a rigorous reliability model for the electric power system evaluating capacity credits that should be recognized for offshore wind resources supplying power demands for Jiangsu, China. Jiangsu is an economic hub located in the Yangtze River delta accounting for 10% of the total electricity consumed in China. Demand for electricity in Jiangsu is projected to increase from 331 TWh in 2009 to 800 TWh by 2030. Given a wind penetration level of 60% for the future additional Jiangsu power supply, wind resources distributed along the offshore region of five coastal provinces in China (Shandong, Jiangsu, Shanghai, Zhejiang, and Fujian) should merit a capacity credit of 12.9%, the fraction of installed wind capacity that should be recognized to displace coal-fired systems without violating the reliability standard. In the high-coal-price scenario, with 60% wind penetration, reductions in CO2 emissions relative to a business as usual reference could be as large as 200.2 million tons of CO2 or 51.8% of the potential addition, with a cost for emissions avoided of $29.0 per ton.
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
1980-07-01
This document is the final report of the solar energy heating and hot water system installed at the Kansas City Fire Station, Number 24, 2309 Hardesty Street, Kansas City, Missouri. The solar system was designed to provide 47 percent of the space heating, 8800 square feet area and 75 percent of the domestic hot water (DHW) load. The solar system consists of 2808 square feet of Solaron, model 2001, air, flat plate collector subsystem, a concrete box storage subsystem which contains 1428 cubic feet of 1/2 inch diameter pebbles weighing 71 1/2 tons, a DHW preheat tank, blowers, pumps, heatmore » exchangers, air ducting, controls and associated plumbing. Two 120-gallon electric DHW heaters supply domestic hot water which is preheated by the solar system. Auxiliary space heating is provided by three electric heat pumps with electric resistance heaters and four 30-kilowatt electric unit heaters. There are six modes of system operation. This project is part of the Department of Energy PON-1 Solar Demonstration Program with DOE cost sharing $154,282 of the $174,372 solar system cost. The Final Design Review was held March 1977, the system became operational March 1979 and acceptance test was completed in September 1979.« less
46 CFR 176.702 - Installation tests and inspections.
Code of Federal Regulations, 2012 CFR
2012-10-01
..., machinery, fuel tank, or pressure vessel is installed aboard a vessel after completion of the initial... 100 GROSS TONS) INSPECTION AND CERTIFICATION Repairs and Alterations § 176.702 Installation tests and...
46 CFR 176.702 - Installation tests and inspections.
Code of Federal Regulations, 2011 CFR
2011-10-01
..., machinery, fuel tank, or pressure vessel is installed aboard a vessel after completion of the initial... 100 GROSS TONS) INSPECTION AND CERTIFICATION Repairs and Alterations § 176.702 Installation tests and...
46 CFR 176.702 - Installation tests and inspections.
Code of Federal Regulations, 2014 CFR
2014-10-01
..., machinery, fuel tank, or pressure vessel is installed aboard a vessel after completion of the initial... 100 GROSS TONS) INSPECTION AND CERTIFICATION Repairs and Alterations § 176.702 Installation tests and...
46 CFR 176.702 - Installation tests and inspections.
Code of Federal Regulations, 2013 CFR
2013-10-01
..., machinery, fuel tank, or pressure vessel is installed aboard a vessel after completion of the initial... 100 GROSS TONS) INSPECTION AND CERTIFICATION Repairs and Alterations § 176.702 Installation tests and...
46 CFR 176.702 - Installation tests and inspections.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., machinery, fuel tank, or pressure vessel is installed aboard a vessel after completion of the initial... 100 GROSS TONS) INSPECTION AND CERTIFICATION Repairs and Alterations § 176.702 Installation tests and...
ELECTRICITY GENERATION FROM LANDFILL GAS IN TURKEY.
Salihoglu, Nezih Kamil
2018-05-08
Landfill gas (LFG)-to-energy plants in Turkey were investigated, and the LFG-to-energy plant of a metropolitan municipal landfill was monitored for 3 years. Installed capacities and actual gas engine working hours were determined. An equation was developed to estimate the power capacity for LFG-to-energy plants for a given amount of landfilled waste. Monitoring the actual gas generation rates enabled determination of LFG generation factors for Turkish municipal waste. A significant relationship (R = 0.524, p < 0.01, 2-tailed) was found between the amounts of landfilled waste and the ambient temperature, which can be attributed to food consumption and kitchen waste generation behaviors influenced by the ambient temperature. However, no significant correlation was found between the ambient temperature and the generated LFG. A temperature buffering capacity was inferred to exist within the landfill, which enables the anaerobic reactions to continue functioning even during cold seasons. The average LFG and energy generation rates were 45 m 3 LFG/ton waste landfilled and 0.08 MWh/ton waste landfilled, respectively. The mean specific LFG consumption for electricity generation was 529 ± 28 m 3 /MWh.
Gasification of Simplex briquets: briquet production. Vol. 1. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
A 7-ton/hr briquetting plant was installed at International Briquetting in Baltimore, Maryland, and used to produce 360 tons of Simplex briquets from Pittsburgh No. 8 seam, Champion No. 1 mine caking coal and shredded, air-classified Baltimore County refuse. The production of these briquets was funded by the Department of Energy, through the US Bureau of Mines, and a consortium comprised of the New York State Energy Research and Development Authority and the Empire State Electric Energy Research Company. This report describes the briquetting plant and discusses the problems that were encountered in producing the briquets. The following modifications are recommendedmore » for future Simplex briquetting plants: drying equipment should be installed on the RDF feed system to ensure that the RDF moisture is below 18%; the crushed coal must be dried to less than 4% moisture to ensure its free flow in the bins; magnets should be installed above the coal and RDF feed conveyors to remove any tramp metal; a 3/4-inch screen should be installed over the coal feed bin to remove any oversize rocks or lump coal; the RDF handling system and turbulizer discharge to the press should all be enclosed for dust control (the enclosures should be vented to a baghouse); only heavy duty apron conveyors should be used where belt conveyors are needed; briquetts should be cured if they are going to be stored in containers where they might sweat; and a screen with 1 1/4-inch openings should be used to remove the fines from 2 1/4-inch briquets (this screen should be sufficiently large to prevent briquets from crowding together on the screen).« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Baxter, Van D.; Munk, Jeffrey D.; Gehl, Anthony C.
The field study is planned to continue through the 2016 cooling season with the draft final project report due by September 30, 2016. This report provides a description of both installations and preliminary 2015 cooling and fall season performance results for the Knoxville site. For the August 18 through December 14 period, the Knoxville site GS-IHP provided 53.6% total source energy savings compared to a baseline electric RTU/heat pump and electric WH. Peak demand savings ranged from 33% to 59% per month. Energy cost savings of 53.1% have been achieved to date with more than half of that coming frommore » reduced demand charges. Data on installation and maintenance costs are being collected and will be combined with total test period energy savings data for a payback analysis to be included in the project final report. The GS-IHP also saved a significant amount of carbon emissions. The total emission savings for the Knoxville site for the August-December 2015 period were ~0.8 metric tons. If trading for carbon credits ever becomes a reality, additional cost savings would be realized.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Yilmaz, A.O.
Total coal reserve (hard coal + lignite) in the world is 984 billion tons. While hard coal constitutes 52% of the total reserve, lignite constitutes 48% of it. Turkey has only 0.1% of world hard coal reserve and 1.5% of world lignite reserves. Turkey has 9th order in lignite reserve, 8th order in lignite production, and 12th order in total coal (hard coal and lignite) consumption. While hard coal production meets only 13% of its consumption, lignite production meets lignite consumption in Turkey. Sixty-five percent of produced hard coal and 78% of produced lignite are used for electricity generation. Lignitesmore » are generally used for electricity generation due to their low quality. As of 2003, total installed capacity of Turkey was 35,587 MW, 19% (6,774 MW) of which is produced from coal-based thermal power plants. Recently, use of natural gas in electricity generation has increased. While the share of coal in electricity generation was about 50% for 1986, it is replaced by natural gas today.« less
46 CFR 181.520 - Installation and location.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 7 2010-10-01 2010-10-01 false Installation and location. 181.520 Section 181.520... TONS) FIRE PROTECTION EQUIPMENT Portable Fire Extinguishers § 181.520 Installation and location... the space being protected. The installation and location must be to the satisfaction of the Officer in...
Waste-to-Energy Cogeneration Project, Centennial Park
DOE Office of Scientific and Technical Information (OSTI.GOV)
Johnson, Clay; Mandon, Jim; DeGiulio, Thomas
The Waste-to-Energy Cogeneration Project at Centennial Park has allowed methane from the closed Centennial landfill to export excess power into the the local utility’s electric grid for resale. This project is part of a greater brownfield reclamation project to the benefit of the residents of Munster and the general public. Installation of a gas-to-electric generator and waste-heat conversion unit take methane byproduct and convert it into electricity at the rate of about 103,500 Mwh/year for resale to the local utility. The sale of the electricity will be used to reduce operating budgets by covering the expenses for streetlights and utilitymore » bills. The benefits of such a project are not simply financial. Munster’s Waste-to Energy Cogeneration Project at Centennial Park will reduce the community’s carbon footprint in an amount equivalent to removing 1,100 cars from our roads, conserving enough electricity to power 720 homes, planting 1,200 acres of trees, or recycling 2,000 tons of waste instead of sending it to a landfill.« less
International Space Station (ISS)
2006-09-17
This view of the International Space Station, back dropped against the blackness of space and Earth, was taken shortly after the Space Shuttle Atlantis undocked from the orbital outpost at 7:50 a.m. CDT during the STS-115 mission. The unlinking completed after six days, two hours and two minutes of joint operations of the installation of the P3/P4 truss. The new 17 ton truss included batteries, electronics, a giant rotating joint, and sported a second pair of 240-foot solar wings. The new solar arrays will eventually double the onboard power of the Station when their electrical systems are brought online during the next shuttle flight, STS-116.
International Space Station (ISS)
2006-09-17
This view of the International Space Station, back dropped against the blackness of space, was taken shortly after the Space Shuttle Atlantis undocked from the orbital outpost at 7:50 a.m. CDT during the STS-115 mission. The unlinking completed after six days, two hours and two minutes of joint operations of the installation of the P3/P4 truss. The new 17 ton truss included batteries, electronics, a giant rotating joint, and sported a second pair of 240-foot solar wings. The new solar arrays will eventually double the onboard power of the Station when their electrical systems are brought online during the next shuttle flight, STS-116.
Reducing Waste from Military Facility Programs...Shed Those Ugly Tons
2011-05-01
USACE guidance 5 BUILDING STRONG® Sustainability Drivers • Net Zero Waste – Assistant Secretary of the Army for Installations, Energy and Environment...Garrison Grafenwoehr, Germany. Fort Bliss and Carson (energy, water, waste) “A net zero waste installation is an installation that reduces
46 CFR 182.430 - Engine exhaust pipe installation.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 7 2014-10-01 2014-10-01 false Engine exhaust pipe installation. 182.430 Section 182... 100 GROSS TONS) MACHINERY INSTALLATION Specific Machinery Requirements § 182.430 Engine exhaust pipe... must be so arranged as to prevent backflow of water from reaching engine exhaust ports under normal...
46 CFR 182.430 - Engine exhaust pipe installation.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 7 2011-10-01 2011-10-01 false Engine exhaust pipe installation. 182.430 Section 182... 100 GROSS TONS) MACHINERY INSTALLATION Specific Machinery Requirements § 182.430 Engine exhaust pipe... must be so arranged as to prevent backflow of water from reaching engine exhaust ports under normal...
INNOVATIVE HYBRID GAS/ELECTRIC CHILLER COGENERATION
DOE Office of Scientific and Technical Information (OSTI.GOV)
Todd Kollross; Mike Connolly
2004-06-30
Engine-driven chillers are quickly gaining popularity in the market place (increased from 7,000 tons in 1994 to greater than 50,000 tons in 1998) due to their high efficiency, electric peak shaving capability, and overall low operating cost. The product offers attractive economics (5 year pay back or less) in many applications, based on areas cooling requirements and electric pricing structure. When heat is recovered and utilized from the engine, the energy resource efficiency of a natural gas engine-driven chiller is higher than all competing products. As deregulation proceeds, real time pricing rate structures promise high peak demand electric rates, butmore » low off-peak electric rates. An emerging trend with commercial building owners and managers who require air conditioning today is to reduce their operating costs by installing hybrid chiller systems that combine gas and electric units. Hybrid systems not only reduce peak electric demand charges, but also allow customers to level their energy load profiles and select the most economical energy source, gas or electricity, from hour to hour. Until recently, however, all hybrid systems incorporated one or more gas-powered chillers (engine driven and/or absorption) and one or more conventional electric units. Typically, the cooling capacity of hybrid chiller plants ranges from the hundreds to thousands of refrigeration tons, with multiple chillers affording the user a choice of cooling systems. But this flexibility is less of an option for building operators who have limited room for equipment. To address this technology gap, a hybrid chiller was developed by Alturdyne that combines a gas engine, an electric motor and a refrigeration compressor within a single package. However, this product had not been designed to realize the full features and benefits possible by combining an engine, motor/generator and compressor. The purpose of this project is to develop a new hybrid chiller that can (1) reduce end-user energy costs, (2) lower building peak electric load, (3) increase energy efficiency, and (4) provide standby power. This new hybrid product is designed to allow the engine to generate electricity or drive the chiller's compressor, based on the market price and conditions of the available energy sources. Building owners can minimize cooling costs by operating with natural gas or electricity, depending on time of day energy rates. In the event of a backout, the building owner could either operate the product as a synchronous generator set, thus providing standby power, or continue to operate a chiller to provide air conditioning with support of a small generator set to cover the chiller's electric auxiliary requirements. The ability to utilize the same piece of equipment as a hybrid gas/electric chiller or a standby generator greatly enhances its economic attractiveness and would substantially expand the opportunities for high efficiency cooling products.« less
49. OUTLET WORKS: THREE TON CRANE, ELECTRICAL SYSTEM NO 4. ...
49. OUTLET WORKS: THREE TON CRANE, ELECTRICAL SYSTEM NO 4. Sheet H-4, December 12, 1939. File no. SA 342/60. - Prado Dam, Outlet Works, Santa Ana River near junction of State Highways 71 & 91, Corona, Riverside County, CA
Enabling Decisive Strategic Maneuver for the Army Beyond 2010
1999-08-01
System and a small Advanced Fire Support System ( AFSS ). In the long run, it might be better to have several vehicles share an AFSS . These are...18 tons M-113APC 9 tons C’OTM 4 tons Flyer w/5 ton AFSS 10 tons Flyer, 5 ton resupply 10 tons Robotic rotorcraft Self ferry All systems were...Task Force Man-portable Air Defense System Manpower and Personnel Integration Micro- Autonomous Vehicles Micro-Electro-Mechanics Micro Electric
DOE Office of Scientific and Technical Information (OSTI.GOV)
Armstrong, Peter R.; Sullivan, Gregory P.; Parker, Graham B.
2006-03-31
As part of a larger program targeting the market transformation of packaged rooftop air conditioning, five high-efficiency rooftop air conditioning products were selected in 2002 by the U.S. Department of Energy (DOE) under the Unitary Air Conditioner (UAC) Technology Procurement (http://www.pnl.gov/uac). In February 2003, Fort Gordon in Augusta, Georgia was chosen as the demonstration site. With the goal of validating the field performance and operation of one of the awarded products, a 10-ton high-efficiency packaged rooftop unit (RTU) manufactured by Global Energy Group (GEG) was installed at Fort Gordon in October 2003. Following equipment installation, power metering, air- and refrigerant-sidemore » instrumentation was installed on the GEG RTU and a 4-year old typical-efficiency 20-ton RTU manufactured by AAON . The GEG and AAON units were instrumented identically and operated May through July, 2005, to observe performance under a range of conditions. Based on the data collected as part of this demonstration, the GEG equipment performed at least 8% better in stage-1 (single compressor running) cooling and at least 16% better in stage-2 (both compressors running) than the baseline AAON equipment. Performance comparisons are based on what we call application EER normalized to equivalent specific fan power. The full-load, specific-fan-power-normalized application EERs at ARI design conditions were 10.48 Btu/Wh for the GEG and 9.00 Btu/Wh for the baseline machine. With a cost premium of nearly 50%, and slightly higher maintenance costs, the life-cycle cost analysis shows that the GEG technology pays for itself--a positive net-present value (NPV)--only in climates and buildings with long cooling seasons. Manufacture of this equipment on a larger scale can be expected to reduce costs to the point where it is more broadly cost-effective. The assumed 10-ton baseline and new-technology unit costs are $3824.00 and $5525.00 respectively. If the new technology cost is assumed to drop as sales increase to $4674.50 for a 10-ton unit (i.e. the original cost difference is halved), the life-cycle costs improve. A grid of first cost, annual maintenance cost and electricity price is enumerated and the results presented in the report show the sensitivity of life cycle cost to these three financial parameters in each of eight different climates.« less
Liu, Gang; Bao, Jie
2017-11-01
This study takes the first insight on the rigorous evaluation of electricity generation based on the experimentally measured higher heating value (HHV) of lignin residue, as well as the chemical oxygen demand (COD) and biological oxygen demand (BOD 5 ) of wastewater. For producing one metric ton of ethanol fuel from five typical lignocellulose substrates, including corn stover, wheat straw, rice straw, sugarcane bagasse and poplar sawdust, 1.26-1.85tons of dry lignin residue is generated from biorefining process and 0.19-0.27tons of biogas is generated from anaerobic digestion of wastewater, equivalent to 4335-5981kWh and 1946-2795kWh of electricity by combustion of the generated lignin residue and biogas, respectively. The electricity generation not only sufficiently meets the electricity needs of process requirement, but also generates more than half of electricity surplus selling to the grid. Copyright © 2017 Elsevier Ltd. All rights reserved.
NASA Astrophysics Data System (ADS)
Meinrenken, Christoph
2015-03-01
Capture of CO2, whether from a flue gas source (PCC) or from distributed sources via ambient air (DAC), is a key enabling technology to provide carbon for sustainable synthetic energy carriers such as solar fuels. Based on thermodynamic minimum considerations, DAC is often expected to require about 3 times more energy (per ton CO2 captured) than PCC because CO2 in ambient air is more dilute. Here, we calculate the energy required for a humidity swing-based DAC installation that uses an anionic exchange resin as sorbent. The calculation uses recently measured equilibrium CO2 loadings of the sorbent as function of partial CO2 pressure, temperature, and humidity. We calculate the installation's electricity consumption to be about 45 kJ per mole of pure CO2 at 1 bar (scenario-dependent). Furthermore, we estimate the amount of heat provided by ambient air and thus provide context of the overall energy and entropy balance and thermodynamic minimum views. The electricity consumption is competitive with typical parasitic loads of PCC-equipped coal-fired power plants (40-50 kJ per mole at same pressure) and significantly lower than predicted for other DAC installations such as Na(OH) sorbent-based systems. Our analyses elucidate why DAC is not always more energy-intensive that PCC, thus alleviating often cited concerns of significant cost impediments. Financial support by ABB for research presented herein is gratefully acknowledged.
47 CFR 80.853 - Radiotelephone station.
Code of Federal Regulations, 2012 CFR
2012-10-01
... deck above the ship's main deck. (d) The principal operating position of the radiotelephone station must be in the room from which the ship is normally steered while at sea. In installations on cargo ships of 300 gross tons and upwards but less than 500 gross tons on which the keel was laid prior to...
47 CFR 80.853 - Radiotelephone station.
Code of Federal Regulations, 2013 CFR
2013-10-01
... deck above the ship's main deck. (d) The principal operating position of the radiotelephone station must be in the room from which the ship is normally steered while at sea. In installations on cargo ships of 300 gross tons and upwards but less than 500 gross tons on which the keel was laid prior to...
47 CFR 80.853 - Radiotelephone station.
Code of Federal Regulations, 2014 CFR
2014-10-01
... deck above the ship's main deck. (d) The principal operating position of the radiotelephone station must be in the room from which the ship is normally steered while at sea. In installations on cargo ships of 300 gross tons and upwards but less than 500 gross tons on which the keel was laid prior to...
47 CFR 80.853 - Radiotelephone station.
Code of Federal Regulations, 2011 CFR
2011-10-01
... deck above the ship's main deck. (d) The principal operating position of the radiotelephone station must be in the room from which the ship is normally steered while at sea. In installations on cargo ships of 300 gross tons and upwards but less than 500 gross tons on which the keel was laid prior to...
47 CFR 80.853 - Radiotelephone station.
Code of Federal Regulations, 2010 CFR
2010-10-01
... deck above the ship's main deck. (d) The principal operating position of the radiotelephone station must be in the room from which the ship is normally steered while at sea. In installations on cargo ships of 300 gross tons and upwards but less than 500 gross tons on which the keel was laid prior to...
49 CFR 236.1005 - Requirements for Positive Train Control systems.
Code of Federal Regulations, 2012 CFR
2012-10-01
... be determined and reported as follows: (i) The traffic density threshold of 5 million gross tons... in rail traffic such as reductions in total traffic volume to a level below 5 million gross tons... requirement to install PTC on a low density track segment where a PTC system is otherwise required by this...
49 CFR 236.1005 - Requirements for Positive Train Control systems.
Code of Federal Regulations, 2014 CFR
2014-10-01
... be determined and reported as follows: (i) The traffic density threshold of 5 million gross tons... in rail traffic such as reductions in total traffic volume to a level below 5 million gross tons... requirement to install PTC on a low density track segment where a PTC system is otherwise required by this...
49 CFR 236.1005 - Requirements for Positive Train Control systems.
Code of Federal Regulations, 2013 CFR
2013-10-01
... be determined and reported as follows: (i) The traffic density threshold of 5 million gross tons... in rail traffic such as reductions in total traffic volume to a level below 5 million gross tons... requirement to install PTC on a low density track segment where a PTC system is otherwise required by this...
Evaluation of Aqua-Ammonia Chiller Technologies and Field Site Installation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zaltash, Abdolreza
2007-09-01
The Naval Facilities Engineering Service Center (NFESC) has sponsored Oak Ridge National Laboratory (ORNL) to review, select, and evaluate advanced, gas-fired, 5-ton, aqua-ammonia, chiller technologies. The selection criteria was that units have COP values of 0.67 or better at Air-conditioning and Refrigeration Institute (ARI) 95 F outdoor rating conditions, an active refrigerant flow control, and a variable-speed condenser fan. These features are expected to allow these units to operate at higher ambient temperatures (up to the maximum operating temperature of 110 F) with minimal degradation in performance. ORNL evaluated three potential manufacturers of advanced, gas-fired, 5-ton, aqua-ammonia chillers-Robur, Ambian, andmore » Cooling Technologies. Unfortunately, Robur did not meet the COP requirements and Cooling Technologies could not deliver a unit to be tested at the U.S. Department of Energy (DOE)-ORNL environmental chamber testing facility for thermally activated heat pumps. This eliminated these two technologies from further consideration, leaving only the Ambian chillers for evaluation. Two Ambian chillers were evaluated at the DOE-ORNL test facility. Overall these chillers operated well over a wide range of ambient conditions with minimal degradation in performance due to several control strategies used such as a variable speed condenser fan, a modulating burner, and active refrigerant flow control. These Ambian pre-commercial units were selected for installation and field testing at three federal facilities. NFESC worked with ORNL to assist with the site selection for installation and evaluation of these chillers. Two sites (ORNL and Naval Surface Warfare Center [NSWC] Corona) had a single chiller unit installed; and at one site (Naval Amphibious Base [NAB] Little Creek), two 5-ton chillers linked together were installed to provide 10 tons of cooling. A chiller link controller developed under this project was evaluated in the field test at Little Creek.« less
Energy Information Administration quarterly coal report, October--December 1992
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-05-21
The United States produced just over 1 billion short tons of coal in 1992, 0.4 percent more than in 1991. Most of the 4-million-short-ton increase in coal production occurred west of the Mississippi River, where a record level of 408 million short tons of coal was produced. The amount of coal received by domestic consumers in 1992 totaled 887 million short tons. This was 7 million short tons more than in 1991, primarily due to increased coal demand from electric utilities. The average price of delivered coal to each sector declined by about 2 percent. Coal consumption in 1992 wasmore » 893 million short tons, only 1 percent higher than in 1991, due primarily to a 1-percent increase in consumption at electric utility plants. Consumer coal stocks at the end of 1992 were 163 million short tons, a decrease of 3 percent from the level at the end of 1991, and the lowest year-end level since 1989. US coal exports fell 6 percent from the 1991 level to 103 million short tons in 1992. Less coal was exported to markets in Europe, Asia, and South America, but coal exports to Canada increased 4 million short tons.« less
Solar heating and cooling system design and development
NASA Technical Reports Server (NTRS)
1978-01-01
The progress of the program during the sixth program quarter is reported. The program calls for the development and delivery of eight prototype solar heating and cooling systems for installation and operational test. The William O'Brien single-family heating system was installed and is operational. The New Castle single-family heating residence is under construction. The Kansas University (KU) system is in the final design stages. The 25 ton cooling subsystem for KU is the debugging stage. Pressure drops that were greater than anticipated were encountered. The 3 ton simulation work is being finalized and the design parameters for the Rankine system were determined from simulation output.
Central cooling: compressive chillers
DOE Office of Scientific and Technical Information (OSTI.GOV)
Christian, J.E.
1978-03-01
Representative cost and performance data are provided in a concise, useable form for three types of compressive liquid packaged chillers: reciprocating, centrifugal, and screw. The data are represented in graphical form as well as in empirical equations. Reciprocating chillers are available from 2.5 to 240 tons with full-load COPs ranging from 2.85 to 3.87. Centrifugal chillers are available from 80 to 2,000 tons with full load COPs ranging from 4.1 to 4.9. Field-assemblied centrifugal chillers have been installed with capacities up to 10,000 tons. Screw-type chillers are available from 100 to 750 tons with full load COPs ranging from 3.3more » to 4.5.« less
Systems-Level Energy Audit for Main Complex, Construction Engineering Research Laboratory
2003-08-01
gas-fired boilers. Cooling is provided by two York electric chillers housed in the Utilities Building. Electric- ity and gas are metered by...small “instant recovery” electric water heater with a 20-gal size tank. Cooling In the spring of 1993, two R-22 (HCFC) York chiller units (rated at 180...tons each, but which can be peaked at 230 tons under favorable conditions) were in- stalled to replace the old chiller in the Utilities Building
Solar heating system at Quitman County Bank, Marks, Mississippi
NASA Technical Reports Server (NTRS)
1980-01-01
Information on the Solar Energy Heating System installed in a single story wood frame, cedar exterior, sloped roof building is presented. The system has on-site temperature and power measurements readouts. The 468 square feet of Solaron air flat plate collectors provide for 2,000 square feet of space heating, an estimated 60 percent of the heating load. Solar heated air is distributed to the 235 cubic foot rock storage box or to the load (space heating) by a 960 cubic feet per minute air handler unit. A 7.5 ton Carrier air-to-air heat pump with 15 kilowatts of electric booster strips serve as a back-up (auxiliary) to the solar system. Motorized dampers control the direction of airflow and back draft dampers prevent thermal siphoning of conditioned air.
NASA Astrophysics Data System (ADS)
Thomas, Brinda A.; Hausfather, Zeke; Azevedo, Inês L.
2014-07-01
Many US states rely on energy efficiency goals as a strategy to reduce CO2e emissions and air pollution, to minimize investments in new power plants, and to create jobs. For those energy efficiency interventions that are cost-effective, i.e., saving money and reducing energy, consumers may increase their use of energy services, or re-spend cost savings on other carbon- and energy-intensive goods and services. In this paper, we simulate the magnitude of these ‘rebound effects’ in each of the 50 states in terms of CO2e emissions, focusing on residential electric end-uses under plausible assumptions. We find that a 10% reduction in annual electricity use by a household results in an emissions’ reduction penalty ranging from 0.1 ton CO2e in California to 0.3 ton CO2e in Alabama (from potential emissions reductions of 0.3 ton CO2e and 1.6 ton CO2e, respectively, in the no rebound case). Rebound effects, percentage-wise, range from 6% in West Virginia (which has a high-carbon electricity and low electricity prices), to as high as 40% in California (which has low-carbon electricity and high electricity prices). The magnitude of rebound effects percentage-wise depends on the carbon intensity of the grid: in states with low emissions factors and higher electricity prices, such as California, the rebound effects are much larger percentage-wise than in states like Pennsylvania. Conversely, the states with larger per cent rebound effects are the ones where the implications in terms of absolute emissions changes are the smallest.
Our Hidden Past: Precious Metals
DOE Office of Scientific and Technical Information (OSTI.GOV)
Smith, Ray; Larson, Clarence E.; Banic, George M.
Y-12's calutrons required electrical conductor material, but during the war, copper was in short supply. The U.S. Treasury loaned Y-12 14,700 tons of silver, valued at $600M. All but 67 tons was returned after the war, and those 67 tons remained in Building 9731 until 1970 for use in separating isotopes for medical research.
A 2000 ton crawler/transporter for operation in Prudhoe Bay, Alaska
DOE Office of Scientific and Technical Information (OSTI.GOV)
Trask, W.H.; Trask, J.L.; Crane, T.
1986-01-01
Recently designed and fabricated in Kennewick, Washington, a pair of 2000 ton capacity crawler/transporters has been used in moving refinery modules to permanent installations on Alaska's North Slope. Vehicle design features include four corner chain-driven, track driving sprockets (tumblers), resilient track roller suspensions, elevating load platform (hereinafter ''bolsters''), dynamic braking, diesel/torque converter power, automatic lubrication and electro-pneumatic controls. Four independent power units provide 1400 horse-power per crawler and over two million pounds of drawbar pull at converter stall. Weighing 300 tons, the pin-connected crawler dissembles for highway transport into loads of under 95,000 pounds.
Gingerich, Daniel B; Mauter, Meagan S
2018-02-06
Conventional processes for municipal wastewater treatment facilities are energy and materially intensive. This work quantifies the air emission implications of energy consumption, chemical use, and direct pollutant release at municipal wastewater treatment facilities across the U.S. and assesses the potential to avoid these damages by generating electricity and heat from the combustion of biogas produced during anaerobic sludge digestion. We find that embedded and on-site air emissions from municipal wastewater treatment imposed human health, environmental, and climate (HEC) damages on the order of $1.63 billion USD in 2012, with 85% of these damages attributed to the estimated consumption of 19 500 GWh of electricity by treatment processes annually, or 0.53% of the US electricity demand. An additional 11.8 million tons of biogenic CO 2 are directly emitted by wastewater treatment and sludge digestion processes currently installed at plants. Retrofitting existing wastewater treatment facilities with anaerobic sludge digestion for biogas production and biogas-fueled heat and electricity generation has the potential to reduce HEC damages by up to 24.9% relative to baseline emissions. Retrofitting only large plants (>5 MGD), where biogas generation is more likely to be economically viable, would generate HEC benefits of $254 annually. These findings reinforce the importance of accounting for use-phase embedded air emissions and spatially resolved marginal damage estimates when designing sustainable infrastructure systems.
Atmospheric emissions and pollution from the coal-fired thermal power plants in India
NASA Astrophysics Data System (ADS)
Guttikunda, Sarath K.; Jawahar, Puja
2014-08-01
In India, of the 210 GW electricity generation capacity, 66% is derived from coal, with planned additions of 76 GW and 93 GW during the 12th and the 13th five year plans, respectively. Atmospheric emissions from the coal-fired power plants are responsible for a large burden on human health. In 2010-11, 111 plants with an installed capacity of 121 GW, consumed 503 million tons of coal, and generated an estimated 580 ktons of particulates with diameter less than 2.5 μm (PM2.5), 2100 ktons of sulfur dioxides, 2000 ktons of nitrogen oxides, 1100 ktons of carbon monoxide, 100 ktons of volatile organic compounds, and 665 million tons of carbon dioxide. These emissions resulted in an estimated 80,000 to 115,000 premature deaths and 20.0 million asthma cases from exposure to PM2.5 pollution, which cost the public and the government an estimated INR 16,000 to 23,000 crores (USD 3.2 to 4.6 billion). The emissions were estimated for the individual plants and the atmospheric modeling was conducted using CAMx chemical transport model, coupled with plume rise functions and hourly meteorology. The analysis shows that aggressive pollution control regulations such as mandating flue gas desulfurization, introduction and tightening of emission standards for all criteria pollutants, and updating procedures for environment impact assessments, are imperative for regional clean air and to reduce health impacts. For example, a mandate for installation of flue gas desulfurization systems for the operational 111 plants could reduce the PM2.5 concentrations by 30-40% by eliminating the formation of the secondary sulfates and nitrates.
Environmental impact assessment using a GSR tool for a landfarming case in South Korea.
Lim, Hyeongseok; Kwon, Ip-Sae; Lee, Hanuk; Park, Jae-Woo
2016-04-01
An environmental impact assessment of a landfarming process, which was performed at an actual petroleum-contaminated site, was conducted using a green and sustainable remediation (GSR) tool in this study. The landfarming process was divided into four stages: site preparation, installation, system operation, and system dismantling/waste disposal. The environmental footprints of greenhouse gas (GHG) emissions, water consumption, total energy usage, and air pollutants (SOx, NOx, and PM10) were analyzed. GHG emissions and water consumption were approximately 276 metric tons and 7.90E + 05 gal, respectively, in stage III, where they were the highest due to the consumables and equipment use in the system operation. Total energy usage had the highest value of 1.54E + 03 MMBTU in stage II due to material production. The SOx and NOx emissions primarily occurred in stages I and II due to energy usage. The PM10 was mostly emitted in stages I and III and was associated with heavy use of equipment. To reduce the environmental footprints, biodiesel and sunlight were suggested as alternatives in this study. The GHG and SOx emissions decreased to 1.7 and 4.4E-04 metric tons, respectively, on the basis of total emissions with a 1 % increase in biodiesel content, but the NOx emissions increased to 5.6E-03 metric tons. If sunlight was used instead of electricity, the GHG and NOx emissions could be reduced by as much as 79 and 84 %, respectively, and the SOx emissions could also be reduced.
46 CFR 111.35-1 - Electrical propulsion installations.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Electrical propulsion installations. 111.35-1 Section... ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Propulsion § 111.35-1 Electrical propulsion installations. Each electric propulsion installation must meet sections 4-8-5/5.5, 4-8-5/5.11, 4-8-5/5.13, 4-8-5/5.17...
46 CFR 111.35-1 - Electrical propulsion installations.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Electrical propulsion installations. 111.35-1 Section... ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Propulsion § 111.35-1 Electrical propulsion installations. Each electric propulsion installation must meet sections 4-8-5/5.5, 4-8-5/5.11, 4-8-5/5.13, 4-8-5/5.17...
46 CFR 111.35-1 - Electrical propulsion installations.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Electrical propulsion installations. 111.35-1 Section... ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Propulsion § 111.35-1 Electrical propulsion installations. Each electric propulsion installation must meet sections 4-8-5/5.5, 4-8-5/5.11, 4-8-5/5.13, 4-8-5/5.17...
46 CFR 111.35-1 - Electrical propulsion installations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Electrical propulsion installations. 111.35-1 Section... ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Propulsion § 111.35-1 Electrical propulsion installations. Each electric propulsion installation must meet sections 4-8-5/5.5, 4-8-5/5.11, 4-8-5/5.13, 4-8-5/5.17...
46 CFR 111.35-1 - Electrical propulsion installations.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Electrical propulsion installations. 111.35-1 Section... ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Propulsion § 111.35-1 Electrical propulsion installations. Each electric propulsion installation must meet sections 4-8-5/5.5, 4-8-5/5.11, 4-8-5/5.13, 4-8-5/5.17...
NASA Astrophysics Data System (ADS)
Widodo, S. B.; Hamdani; Rizal, T. A.; Pambudi, N. A.
2018-02-01
In Langsa, fisheries are the sector leaders by fulfilling a capacity of about 6,050 tons per year and on the other hand, fish-aquaculture reaches 1,200 tons per year on average. The fish processing is conducted through catches and aquaculture. The facilities on which this processing takes place are divided into an ice factory unit, a gutting and cutting unit, a drying unit and a curing unit. However, the energy and electricity costs during the production process has become major constraint because of the increase in the fishermen’s production and income. In this study, the potential and cost-effectiveness of photovoltaic solar power plant to meet the energy demands of fish processing units have been analysed. The energy requirements of fish processing units have reached an estimate of 130 kW, while the proposed design of solar photovoltaic electricity generation is of 200 kW in an area of 0,75 hectares. In this analysis, given the closeness between the location of the processing units and the fish supply auctions, the assumption is made that the photovoltaic plants (OTR) were installed on the roof of the building as compared to the solar power plants (OTL) installed on the outside of the location. The results shows that the levelized cost of OTR instalation is IDR 1.115 per kWh, considering 25 years of plant life-span at 10% of discount rate, with a simple payback period of 13.2 years. OTL levelized energy, on the other hand, is at IDR 997.5 per kWh with a simple payback period of 9.6 years. Blood is an essential component of living creatures in the vascular space. For possible disease identification, it can be tested through a blood test, one of which can be seen from the form of red blood cells. The normal and abnormal morphology of the red blood cells of a patient is very helpful to doctors in detecting a disease. With the advancement of digital image processing technology can be used to identify normal and abnormal blood cells of a patient. This research used self-organizing map method to classify the normal and abnormal form of red blood cells in the digital image. The use of self-organizing map neural network method can be implemented to classify the normal and abnormal form of red blood cells in the input image with 93,78% accuracy testing.
NASA Astrophysics Data System (ADS)
Kittipongvises, Suthirat; Chavalparit, Orathai; Sutthirat, Chakkaphan
2016-12-01
This paper is aimed to systematically assess greenhouse gases (GHGs) and energy intensity of the granite rock mining operations in Thailand and also identify a range of feasible options to minimize their GHG emissions. Mining factories A, B and C, located in the Eastern region of Thailand, were selected as research case studies. The results indicated that the 3-year average of GHGs emissions from factories A to C was 3387 718 kgCO2e per year with approximately 2.92 kgCO2e per ton of granite rock produced over 2012 to 2014. Of this, the carbon intensity of grid-electricity consumption for the crushed rock production was 1.84 kgCO2/kWh. Diesel fuel combustion for transport activities in the mining factories was the greatest contributor to GHGs emissions (68 %) compared to the purchased electricity and explosion process, with 31 % and 1 %, respectively. In-Pit Crushing and Conveying (IPCC) installation, haul truck payload optimization and management, and reduction in tire rolling resistance have shown potential to reduce carbon emissions accounted for 20 % to 70 %.
29 CFR 1910.306 - Specific purpose equipment and installations.
Code of Federal Regulations, 2014 CFR
2014-07-01
... and multicar installations. On single-car and multicar installations, equipment receiving electrical... ADMINISTRATION, DEPARTMENT OF LABOR OCCUPATIONAL SAFETY AND HEALTH STANDARDS Electrical Design Safety Standards for Electrical Systems § 1910.306 Specific purpose equipment and installations. (a) Electric signs and...
29 CFR 1910.306 - Specific purpose equipment and installations.
Code of Federal Regulations, 2012 CFR
2012-07-01
... and multicar installations. On single-car and multicar installations, equipment receiving electrical... ADMINISTRATION, DEPARTMENT OF LABOR OCCUPATIONAL SAFETY AND HEALTH STANDARDS Electrical Design Safety Standards for Electrical Systems § 1910.306 Specific purpose equipment and installations. (a) Electric signs and...
29 CFR 1910.306 - Specific purpose equipment and installations.
Code of Federal Regulations, 2013 CFR
2013-07-01
... and multicar installations. On single-car and multicar installations, equipment receiving electrical... ADMINISTRATION, DEPARTMENT OF LABOR OCCUPATIONAL SAFETY AND HEALTH STANDARDS Electrical Design Safety Standards for Electrical Systems § 1910.306 Specific purpose equipment and installations. (a) Electric signs and...
Livingston Parish Landfill Methane Recovery Project (Feasibility Study)
DOE Office of Scientific and Technical Information (OSTI.GOV)
White, Steven
The Woodside Landfill is owned by Livingston Parish, Louisiana and is operated under contract by Waste Management of Louisiana LLC. This public owner/private operator partnership is commonplace in the solid waste industry today. The landfill has been in operation since approximately 1988 and has a permitted capacity of approximately 41 million cubic yards. Based on an assumed in-place waste density of 0.94 ton per cubic yard, the landfill could have an expected design capacity of 39.3 million tons. The landfill does have an active landfill gas collection and control system (LFGCCS) in place because it meets the minimum thresholds formore » the New Source Performance Standards (NSPS). The initial LFGCS was installed prior to 2006 and subsequent phases were installed in 2007 and 2010. The Parish received a grant from the United States Department of Energy in 2009 to evaluate the potential for landfill gas recovery and utilization at the Woodside Landfill. This includes a technical and economic feasibility study of a project to install a landfill gas to energy (LFGTE) plant and to compare alternative technologies. The LFGTE plant can take the form of on-site electrical generation, a direct use/medium Btu option, or a high-Btu upgrade technology. The technical evaluation in Section 2 of this report concludes that landfill gas from the Woodside landfill is suitable for recovery and utilization. The financial evaluations in sections 3, 4, and 5 of this report provide financial estimates of the returns for various utilization technologies. The report concludes that the most economically viable project is the Electricity Generation option, subject to the Parish’s ability and willingness to allocate adequate cash for initial capital and/or to obtain debt financing. However, even this option does not present a solid return: by our estimates, there is a 19 year simple payback on the electricity generation option. All of the energy recovery options discussed in this report economically stressed. The primary reason for this is the recent fundamental shift in the US energy landscape. Abundant supplies of natural gas have put downward pressure on any project that displaces natural gas or natural gas substitutes. Moreover, this shift appears long-term as domestic supplies for natural gas may have been increased for several hundred years. While electricity prices are less affected by natural gas prices than other thermal projects, they are still significantly affected since much of the power in the Entergy cost structure is driven by natural gas-fired generation. Consequently, rates reimbursed by the power company based on their avoided cost structure also face downward pressure over the near and intermediate term. In addition, there has been decreasing emphasis on environmental concerns regarding the production of thermal energy, and as a result both the voluntary and mandatory markets that drive green attribute prices have softened significantly over the past couple of years. Please note that energy markets are constantly changing due to fundamental supply and demand forces, as well as from external forces such as regulations and environmental concerns. At any point in the future, the outlook for energy prices may change and could deem either the electricity generation or pipeline injection project more feasible. This report is intended to serve as the primary background document for subsequent decisions made at Parish staff and governing board levels.« less
14 CFR 29.1353 - Electrical equipment and installations.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Equipment § 29.1353 Electrical equipment and installations. (a) Electrical equipment, controls, and wiring... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Electrical equipment and installations. 29... installations has shown that maintaining safe cell temperatures and pressures presents no problem. (3) No...
46 CFR 167.40-1 - Electrical installations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 7 2010-10-01 2010-10-01 false Electrical installations. 167.40-1 Section 167.40-1... SHIPS Certain Equipment Requirements § 167.40-1 Electrical installations. (a) Except as otherwise...) Changes or alterations in the electrical installations of vessels now in service shall be in accordance...
29 CFR 1926.402 - Applicability.
Code of Federal Regulations, 2014 CFR
2014-07-01
...) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Electrical Installation Safety Requirements § 1926.402... electrical equipment and installations used to provide electric power and light at the jobsite. These... commenced. Note: If the electrical installation is made in accordance with the National Electrical Code ANSI...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Drakopoulou, Evangelia
The Accelerator Neutrino Neutron Interaction Experiment (ANNIE) is a 26-ton Gd-doped water Cherenkov detector installed in the Booster Neutrino Beam at Fermilab. The experiment has two complementary goals: (1) perform the first measurement of the neutron yield frommore » $$\
14 CFR 25.1353 - Electrical equipment and installations.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Electrical equipment and installations. 25... TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Equipment Electrical Systems and Equipment § 25.1353 Electrical equipment and installations. (a) Electrical equipment and controls must be...
14 CFR 25.1353 - Electrical equipment and installations.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Electrical equipment and installations. 25... TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Equipment Electrical Systems and Equipment § 25.1353 Electrical equipment and installations. (a) Electrical equipment and controls must be...
14 CFR 25.1353 - Electrical equipment and installations.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Electrical equipment and installations. 25... TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Equipment Electrical Systems and Equipment § 25.1353 Electrical equipment and installations. (a) Electrical equipment and controls must be...
14 CFR 29.1353 - Electrical equipment and installations.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Electrical equipment and installations. 29... TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Equipment Electrical Systems and Equipment § 29.1353 Electrical equipment and installations. (a) Electrical equipment, controls, and wiring...
14 CFR 29.1353 - Electrical equipment and installations.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Electrical equipment and installations. 29... TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Equipment Electrical Systems and Equipment § 29.1353 Electrical equipment and installations. (a) Electrical equipment, controls, and wiring...
14 CFR 25.1353 - Electrical equipment and installations.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Electrical equipment and installations. 25... TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Equipment Electrical Systems and Equipment § 25.1353 Electrical equipment and installations. (a) Electrical equipment and controls must be...
14 CFR 29.1353 - Electrical equipment and installations.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Electrical equipment and installations. 29... TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Equipment Electrical Systems and Equipment § 29.1353 Electrical equipment and installations. (a) Electrical equipment, controls, and wiring...
4. LOOKING SOUTHEAST INSIDE OF ELECTRIC FURNACE BUILDING ON GROUND ...
4. LOOKING SOUTHEAST INSIDE OF ELECTRIC FURNACE BUILDING ON GROUND FLOOR OF CHARGING AISLE. VIEW OF 50 TON CAPACITY CHARGING BUCKET. - U.S. Steel Duquesne Works, Electric Furnace Steelmaking Plant, Along Monongahela River, Duquesne, Allegheny County, PA
Alumina Calcination in the Fluid-Flash Calciner
NASA Astrophysics Data System (ADS)
Fish, William M.
In the mid 40's, Alcoa turned to fluidized solids techniques as a means of improving the efficiency of the alumina calcining process. This paper traces calciner development from the first pilot operation in 1946 through the first plant fluid-bed unit in 1952, the early "fluid-flash" calciner designs in 1960, the first 300 ton/day fluid-flash calciner at Alcoa's Bauxite, Arkansas plant in 1963, the 600 ton/day calciners installed in Suriname and Australia in 1965 and 1966, up to the 1500 ton/day Mark III calciners now operating in Jamaica, Australia and the United States. These Mark III fluid-flash calciners have provided a 30 to 40 percent fuel saving in addition to major savings in capital investment and maintenance costs.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
Statistical data on energy production and consumption and supporting information were obtained from US Bureau of Mines records supplemented by additional data obtained in Portugal. Geologic descriptions and analysis of known areas and of areas having possible future potential have been prepared by the US Geological Survey. Portugal lacks sufficient indigenous supplies of organic fuels to meet its energy demands, and so must import large quantities of petroleum and coal. Approximately 80% of Portugal's electric energy is produced by hydroelectric stations; thermal stations produce the other 20%. Portugal has produced no crude oil, natural gas, or condensate; no resources ormore » reserves in these categories are listed for Portugal in the 1976 World Energy Conference report. Until the last year or so (1980), no significant onshore petroleum exploration had been done in Portugal since 1963. Production of coal in Portugal has declined steadily to the present annual yield of about 200,000 metric tons. On the basis of estimates in only three coal fields, resources of coal of all ranks in Portugal total at least 76 million (10/sup 6/) metric tons. Uranium is mined near Viseu and Guarda in the northern part of Portugal; the Nisa mine in east-central Portugal will begin producing uranium ore in 1985 after installation of a processing plant. Portugal produced 95 metric tons of uranium oxide (U/sub 3/O/sub 8/) from ore stocks in each year from 1972 through 1974; production is assumed to have continued at the same rate since then. Geothermal energy has not been developed in mainland Portugal; however, hot springs that may have geothermal energy potential are known in the Minho district in the northwest. Geothermal energy resources exist in the Azores and a program of evaluation and exploration with technical assistance from the USGS is presently in progress there.« less
46 CFR 167.40-1 - Electrical installations.
Code of Federal Regulations, 2011 CFR
2011-10-01
... (Electrical Engineering) of this chapter. (3) Institute of Electrical and Electronic Engineers, Inc. (IEEE... 46 Shipping 7 2011-10-01 2011-10-01 false Electrical installations. 167.40-1 Section 167.40-1... SHIPS Certain Equipment Requirements § 167.40-1 Electrical installations. (a) Except as otherwise...
46 CFR 167.40-1 - Electrical installations.
Code of Federal Regulations, 2012 CFR
2012-10-01
... (Electrical Engineering) of this chapter. (3) Institute of Electrical and Electronic Engineers, Inc. (IEEE... 46 Shipping 7 2012-10-01 2012-10-01 false Electrical installations. 167.40-1 Section 167.40-1... SHIPS Certain Equipment Requirements § 167.40-1 Electrical installations. (a) Except as otherwise...
46 CFR 167.40-1 - Electrical installations.
Code of Federal Regulations, 2014 CFR
2014-10-01
... (Electrical Engineering) of this chapter. (3) Institute of Electrical and Electronic Engineers, Inc. (IEEE... 46 Shipping 7 2014-10-01 2014-10-01 false Electrical installations. 167.40-1 Section 167.40-1... SHIPS Certain Equipment Requirements § 167.40-1 Electrical installations. (a) Except as otherwise...
46 CFR 167.40-1 - Electrical installations.
Code of Federal Regulations, 2013 CFR
2013-10-01
... (Electrical Engineering) of this chapter. (3) Institute of Electrical and Electronic Engineers, Inc. (IEEE... 46 Shipping 7 2013-10-01 2013-10-01 false Electrical installations. 167.40-1 Section 167.40-1... SHIPS Certain Equipment Requirements § 167.40-1 Electrical installations. (a) Except as otherwise...
Prototype solar heating and cooling systems
NASA Technical Reports Server (NTRS)
1978-01-01
Eight prototype systems were developed. The systems are 3, 25, and 75-ton size units. The manufacture, test, installation, maintenance, problem resolution, and performance evaluation of the systems is described. Size activities for the various systems are included.
Synergies of wind power and electrified space heating: case study for Beijing.
Chen, Xinyu; Lu, Xi; McElroy, Michael B; Nielsen, Chris P; Kang, Chongqing
2014-01-01
Demands for electricity and energy to supply heat are expected to expand by 71% and 47%, respectively, for Beijing in 2020 relative to 2009. If the additional electricity and heat are supplied solely by coal as is the current situation, annual emissions of CO2 may be expected to increase by 59.6% or 99 million tons over this interval. Assessed against this business as usual (BAU) background, the present study indicates that significant reductions in emissions could be realized using wind-generated electricity to provide a source of heat, employed either with heat pumps or with electric thermal storage (ETS) devices. Relative to BAU, reductions in CO2 with heat pumps assuming 20% wind penetration could be as large as 48.5% and could be obtained at a cost for abatement of as little as $15.6 per ton of avoided CO2. Even greater reductions, 64.5%, could be realized at a wind penetration level of 40% but at a higher cost, $29.4 per ton. Costs for reduction of CO2 using ETS systems are significantly higher, reflecting the relatively low efficiency for conversion of coal to power to heat.
3. LOOKING WEST INSIDE ELECTRIC FURNACE BUILDING ON CHARGING FLOOR. ...
3. LOOKING WEST INSIDE ELECTRIC FURNACE BUILDING ON CHARGING FLOOR. VIEW OF 7 1/2 TON CAPACITY ALLIANCE SIDE DOOR CHARGING MACHINE. - U.S. Steel Duquesne Works, Electric Furnace Steelmaking Plant, Along Monongahela River, Duquesne, Allegheny County, PA
29 CFR 1926.402 - Applicability.
Code of Federal Regulations, 2010 CFR
2010-07-01
... installations used for the generation, transmission, and distribution of electric energy, including related...) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Electrical Installation Safety Requirements § 1926.402... electrical equipment and installations used to provide electric power and light at the jobsite. These...
29 CFR 1926.402 - Applicability.
Code of Federal Regulations, 2011 CFR
2011-07-01
... installations used for the generation, transmission, and distribution of electric energy, including related...) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Electrical Installation Safety Requirements § 1926.402... electrical equipment and installations used to provide electric power and light at the jobsite. These...
30 CFR 250.1628 - Design, installation, and operation of production systems.
Code of Federal Regulations, 2010 CFR
2010-07-01
... mechanical and electrical systems to be installed was approved by registered professional engineers. After... Installation of Offshore Production Platform Piping Systems; (3) Electrical system information including a plan... Practice for Classification of Locations for Electrical Installations at Petroleum Facilities Classified as...
Dredging Research Program. Dredge Mooring Study, Recommended Design, Phase 2 Report
1992-05-01
describes the amount of dock space and staging area required (250 ft by 300 ft of dock space), crane requirements (a 50- to 60-ton crane ), and time and...including a diver) in 1 week or less (5 days minimum). With the addition of a second crane and second anchor handling vessel, the assembly and installation...describes the amount of dock space and staging area required (250 ft by 300 ft of dock space), crane requirements (a 50- to 60-ton crane ), and time and
NASA Technical Reports Server (NTRS)
1980-01-01
The solar energy system installed in the building has 2,978 sq ft of single axis tracking, concentrating collectors and provides solar energy for space heating, space cooling and domestic hot water. A 1,200,000 Btu/hour water tube gas boiler provides hot water for space heating. Space cooling is provided by a 100 ton hot water fired absorption chiller. Domestic hot water heating is provided by a 50 gallon natural gas domestic storage water heater. Extracts from the site files, specification references, drawings, installation, operation and maintenance instructions are included.
Code of Federal Regulations, 2012 CFR
2012-07-01
.... (a) The owner or operator of any multiple hearth, fluidized bed, or electric sludge incinerator... kg/Mg (0.75 lb/ton) dry sludge input or less during the most recent performance test, a scrubber... particulate matter emission rate of greater than 0.38 kg/Mg (0.75 lb/ton) dry sludge input during the most...
Code of Federal Regulations, 2013 CFR
2013-07-01
.... (a) The owner or operator of any multiple hearth, fluidized bed, or electric sludge incinerator... kg/Mg (0.75 lb/ton) dry sludge input or less during the most recent performance test, a scrubber... particulate matter emission rate of greater than 0.38 kg/Mg (0.75 lb/ton) dry sludge input during the most...
Code of Federal Regulations, 2014 CFR
2014-07-01
.... (a) The owner or operator of any multiple hearth, fluidized bed, or electric sludge incinerator... kg/Mg (0.75 lb/ton) dry sludge input or less during the most recent performance test, a scrubber... particulate matter emission rate of greater than 0.38 kg/Mg (0.75 lb/ton) dry sludge input during the most...
Code of Federal Regulations, 2011 CFR
2011-07-01
.... (a) The owner or operator of any multiple hearth, fluidized bed, or electric sludge incinerator... kg/Mg (0.75 lb/ton) dry sludge input or less during the most recent performance test, a scrubber... particulate matter emission rate of greater than 0.38 kg/Mg (0.75 lb/ton) dry sludge input during the most...
2000-11-30
Nearby waters reflect the flames of the Space Shuttle Endeavor as she lifts off November 30, 2000, carrying the STS-97 crew of five. The STS-97 mission's primary objective was the delivery, assembly, and activation of the U.S. electrical power system onboard the International Space Station (ISS). The electrical power system, which is built into a 73-meter (240-foot) long solar array structure, consists of solar arrays, radiators, batteries, and electronics. The entire 15.4-metric ton (17-ton) package is called the P6 Integrated Truss Segment and is the heaviest and largest element yet delivered to the station aboard a space shuttle. The electrical system will eventually provide the power necessary for the first ISS crews to live and work in the U.S. segment.
2000-11-30
Nearby waters reflect the flames of the Space Shuttle Endeavor as she lifts off November 30, 2000 carrying the STS-97 crew of five. The STS-97 mission's primary objective was the delivery, assembly, and activation of the U.S. electrical power system onboard the International Space Station (ISS). The electrical power system, which is built into a 73-meter (240-foot) long solar array structure, consists of solar arrays, radiators, batteries, and electronics. The entire 15.4-metric ton (17-ton) package is called the P6 Integrated Truss Segment, and is the heaviest and largest element yet delivered to the station aboard a space shuttle. The electrical system will eventually provide the power necessary for the first ISS crews to live and work in the U.S. segment.
Morrow, William R; Griffin, W Michael; Matthews, H Scott
2008-05-15
We update a previously presented Linear Programming (LP) methodology for estimating state level costs for reducing CO2 emissions from existing coal-fired power plants by cofiring switchgrass, a biomass energy crop, and coal. This paper presents national level results of applying the methodology to the entire portion of the United States in which switchgrass could be grown without irrigation. We present incremental switchgrass and coal cofiring carbon cost of mitigation curves along with a presentation of regionally specific cofiring economics and policy issues. The results show that cofiring 189 million dry short tons of switchgrass with coal in the existing U.S. coal-fired electricity generation fleet can mitigate approximately 256 million short tons of carbon-dioxide (CO2) per year, representing a 9% reduction of 2005 electricity sector CO2 emissions. Total marginal costs, including capital, labor, feedstock, and transportation, range from $20 to $86/ton CO2 mitigated,with average costs ranging from $20 to $45/ton. If some existing power plants upgrade to boilers designed for combusting switchgrass, an additional 54 million tons of switchgrass can be cofired. In this case, total marginal costs range from $26 to $100/ton CO2 mitigated, with average costs ranging from $20 to $60/ton. Costs for states east of the Mississippi River are largely unaffected by boiler replacement; Atlantic seaboard states represent the lowest cofiring cost of carbon mitigation. The central plains states west of the Mississippi River are most affected by the boiler replacement option and, in general, go from one of the lowest cofiring cost of carbon mitigation regions to the highest. We explain the variation in transportation expenses and highlight regional cost of mitigation variations as transportation overwhelms other cofiring costs.
Waste electrical and electronic equipment (WEEE) estimation: A case study of Ahvaz City, Iran.
Alavi, Nadali; Shirmardi, Mohammad; Babaei, Aliakbar; Takdastan, Afshin; Bagheri, Nastaran
2015-03-01
The development of new technologies and the increasing consumption of electronic and electrical equipment have led to increased generation of e-waste in the municipal waste streams. This waste due to the presence of hazardous substances in its composition needs specific attention and management. The present study was carried out in Ahvaz metropolis using a survey method in 2011. For estimating the amount of waste electrical and electronic equipment (WEEE) generated, the "use and consumption" method was used. In order to determine the amounts of the electrical and electronic equipment that were used and their lifetime, and for investigating the current status of e-waste management in Ahvaz, an appropriate questionnaire was devised. In 2011, the total number of discarded electronic items was 2,157,742 units. According to the average weight of the equipment, the total generation of e-waste was 9952.25 metric tons per year and was 9.95 kg per capita per year. The highest e-waste generated was related to air conditioners, with 3125.36 metric tons per year, followed by the wastes from refrigerators and freezers, washing machines, and televisions. The wastes from desktop computers and laptops were 418 and 63 metric tons/year, respectively, and the corresponding values per capita were 0.42 and 0.063 kg, respectively. These results also showed that 10 tons fixed phones, 25 tons mobile phones, and by considering an average lifetime of 3 years for each lamp about 320 tons lamps were generated as e-waste in Ahvaz in the year 2011. Based on this study, currently there is not an integrated system for proper management of WEEE in Ahvaz, and this waste stream is collected and disposed of with other municipal waste. Some measures, including a specific collection system, recycling of valuable substances, and proper treatment and disposal, should be done about such waste. Ahvaz is one of the most important economic centers of Iran, and to the best of our knowledge, no study has been carried out to estimate the generation of waste electrical and electronic equipment (WEEE) in this city. Therefore, the authors estimated the generation of the WEEE by the "use and consumption" method. The results of this study can be useful not only for decision-making organizations of Ahvaz to manage and recycle this type of waste but also can be used as a method to estimate the generation of e-waste in different locations of the world, especially in places where the generation of such waste could be a risk to human health and the environment.
INTERIOR VIEW, LOOKING WEST, WITH CRANE OPERATOR, TED SEALS, POURING ...
INTERIOR VIEW, LOOKING WEST, WITH CRANE OPERATOR, TED SEALS, POURING MOLTEN METAL INTO A 1,300 TON ELECTRIC HOLDING FURNACE OR MIXER. AN ELECTRONIC SCALE RECORDED THAT 50.5 TONS OF METAL WERE POURED INTO THE FURNACE DURING THIS POUR. - American Cast Iron Pipe Company, Mixer Building, 1501 Thirty-first Avenue North, Birmingham, Jefferson County, AL
Code of Federal Regulations, 2013 CFR
2013-07-01
... and electric face equipment; installation requirements. (a) Except as provided in paragraph (f) of this section, all self-propelled diesel-powered and electric face equipment, including shuttle cars... and electric face equipment; installation requirements. 75.1710-1 Section 75.1710-1 Mineral Resources...
Code of Federal Regulations, 2014 CFR
2014-07-01
... and electric face equipment; installation requirements. (a) Except as provided in paragraph (f) of this section, all self-propelled diesel-powered and electric face equipment, including shuttle cars... and electric face equipment; installation requirements. 75.1710-1 Section 75.1710-1 Mineral Resources...
Code of Federal Regulations, 2012 CFR
2012-07-01
... and electric face equipment; installation requirements. (a) Except as provided in paragraph (f) of this section, all self-propelled diesel-powered and electric face equipment, including shuttle cars... and electric face equipment; installation requirements. 75.1710-1 Section 75.1710-1 Mineral Resources...
Code of Federal Regulations, 2010 CFR
2010-07-01
... and electric face equipment; installation requirements. (a) Except as provided in paragraph (f) of this section, all self-propelled diesel-powered and electric face equipment, including shuttle cars... and electric face equipment; installation requirements. 75.1710-1 Section 75.1710-1 Mineral Resources...
Code of Federal Regulations, 2011 CFR
2011-07-01
... and electric face equipment; installation requirements. (a) Except as provided in paragraph (f) of this section, all self-propelled diesel-powered and electric face equipment, including shuttle cars... and electric face equipment; installation requirements. 75.1710-1 Section 75.1710-1 Mineral Resources...
30 CFR 77.516 - Electric wiring and equipment; installation and maintenance.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Electric wiring and equipment; installation and... OF UNDERGROUND COAL MINES Electrical Equipment-General § 77.516 Electric wiring and equipment; installation and maintenance. In addition to the requirements of §§ 77.503 and 77.506, all wiring and...
Randolph Plant passes 60-million-ton milestone
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sprouls, M.W.; Adam, B.O.
1983-09-01
Peabody Coal Co.'s Randolph coal preparation plant has processed 60 million tons of coal during 10 years of operation. The plant, which is in Illinois, receives coal from 3 mines and 2 more will eventually send their output for cleaning. Coal from one mine travels 2 miles overland to a 30,000 ton conical bunker constructed of Reinforced Earth. Clean coal is supplied for electricity generation. The plant uses water-only processes, with a jig and three stages of hydrocyclones. A flowsheet of the scalper circuit is given.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mills, M.P.
The United States` competitive position in world markets will be determined by many forces. Two of the fundamental factors are the increased use of new technologies, and the availability of low-cost electricity to operate those technologies. The US currently has an will likely continue to have market dominance in both these critical areas. Both of these factors are intimately related since the primary source of new technologies is electric in nature. And, because low-cost coal now dominates and will continue to dominate the electric supply system, and because the US has both an abundance of coal and the world`s largestmore » fleet of coal-fired power plants, the US will have an expanding base of low-cost electricity that will secure its current competitive advantage for years to come. Electric technologies and, increasingly, computer-based technologies integrated with electric technologies are the primary sources of innovative advancement and economic growth. As a consequence, the growth in electricity, which has historically tracked GNP growth, is expected to continue. And, with the restructuring of the electric utility industry and the emergence of vigorous competition, prices are expected to decline as competition increases. The net effect of these forces will be to dramatically increase the use of electric technologies -- and those sources of electricity that can provide low-cost electricity. The data show that coal, the primary source of new los-cost electricity, will supply between one-half and three-fourths of all new electric supply through 2010, at prices of about 3{cents}/kWh, and can do so without new power plant construction. Since the use of coal is expected to rise by at least 200 to 250 million tons/year over the current consumption of 850 million tons, and could increase as much as 400 million tons/yr, some have raised concerns about the emissions impact from the power plants. This report also shows that the net effect of increased electric use, assuming coal dominance, will be a decrease in emissions. This decrease will occur for two reasons: (a) power plants are becoming increasingly clean, and (b) the electric technologies that consume the electricity displace more emissions than are created at the power plants.« less
Prototype solar heating and cooling systems
NASA Technical Reports Server (NTRS)
1978-01-01
A collection of monthly status reports on the development of eight prototype solar heating and cooling systems is presented. The effort calls for the development, manufacture, test, system installation, maintenance, problem resolution, and performance evaluation. The systems are 3, 25, and 75 ton size units.
Prototype solar heating and cooling systems
NASA Technical Reports Server (NTRS)
1978-01-01
A collection of monthly status reports are given on the development of eight prototype solar heating and cooling systems. This effort calls for the development, manufacturing, test, system installation, maintenance, problem resolution, and performance evaluation. The systems are 3-, 25-, and 75-ton size units.
24 CFR 3285.701 - Electrical crossovers.
Code of Federal Regulations, 2010 CFR
2010-04-01
... URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Electrical Systems and Equipment § 3285.701 Electrical crossovers. Multi-section homes with electrical wiring in more than one section require... installation instructions. ...
46 CFR 182.130 - Alternative standards.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 7 2010-10-01 2010-10-01 false Alternative standards. 182.130 Section 182.130 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) MACHINERY INSTALLATION General Provisions § 182.130 Alternative standards. As an alternative to complying...
2014-04-11
CAPE CANAVERAL, Fla. - Chuck Dovale, at left, deputy program manager of Launch Services, and Nancy Bray, director of Center Operations, cut a ribbon officially opening the new fitness trail next to the Space Station Processing Facility at NASA's Kennedy Space Center in Florida. The one-mile-long track will provide employees with a safe place off Kennedy's roadways to walk or run. The more than 6 tons of green waste removed to create the trail's footprint will be mulched and used for cover at Kennedy's landfill. Approximately 1,594 tons of crawler fines -- ground-up crawler rock removed from the crawlerway in the Launch Complex 39 area -- was used for the foundation of the trail. Fitness equipment has been ordered and will be installed on a concrete slab at the trail's west end. After the equipment has been installed, the slab will be coated to provide a rubberized exercise pad. At Kennedy Space Center, the health and safety of every employee is paramount. To learn more about Kennedy, visit http://www.nasa.gov/kennedy. Photo credit: NASA/Frankie Martin
2014-04-11
CAPE CANAVERAL, Fla. - Director of Center Operations Nancy Bray welcomes the employees who turned out during their lunchtime for a ribbon-cutting ceremony opening the new fitness trail next to the Space Station Processing Facility at NASA's Kennedy Space Center in Florida. The one-mile-long track will provide employees with a safe place off Kennedy's roadways to walk or run. The more than 6 tons of green waste removed to create the trail's footprint will be mulched and used for cover at Kennedy's landfill. Approximately 1,594 tons of crawler fines -- ground-up crawler rock removed from the crawlerway in the Launch Complex 39 area -- was used for the foundation of the trail. Fitness equipment has been ordered and will be installed on a concrete slab at the trail's west end. After the equipment has been installed, the slab will be coated to provide a rubberized exercise pad. At Kennedy Space Center, the health and safety of every employee is paramount. To learn more about Kennedy, visit http://www.nasa.gov/kennedy. Photo credit: NASA/Frankie Martin
2014-04-11
CAPE CANAVERAL, Fla. - Construction of an exercise pad is underway beside the new fitness trail next to the Space Station Processing Facility at NASA's Kennedy Space Center in Florida. The one-mile-long track will provide employees with a safe place off Kennedy's roadways to walk or run. The more than 6 tons of green waste removed to create the trail's footprint will be mulched and used for cover at Kennedy's landfill. Approximately 1,594 tons of crawler fines -- ground-up crawler rock removed from the crawlerway in the Launch Complex 39 area -- was used for the foundation of the trail. Fitness equipment has been ordered and will be installed on a concrete slab at the trail's west end. After the equipment has been installed, the slab will be coated to provide a rubberized exercise pad. At Kennedy Space Center, the health and safety of every employee is paramount. To learn more about Kennedy, visit http://www.nasa.gov/kennedy. Photo credit: NASA/Frankie Martin
Canadarm2 Maneuvers Quest Airlock
NASA Technical Reports Server (NTRS)
2001-01-01
At the control of Expedition Two Flight Engineer Susan B. Helms, the newly-installed Canadian-built Canadarm2, Space Station Remote Manipulator System (SSRMS) maneuvers the Quest Airlock into the proper position to be mated onto the starboard side of the Unity Node I during the first of three extravehicular activities (EVA) of the STS-104 mission. The Quest Airlock makes it easier to perform space walks, and allows both Russian and American spacesuits to be worn when the Shuttle is not docked with the International Space Station (ISS). American suits will not fit through Russion airlocks at the Station. The Boeing Company, the space station prime contractor, built the 6.5-ton (5.8 metric ton) airlock and several other key components at the Marshall Space Flight Center (MSFC), in the same building where the Saturn V rocket was built. Installation activities were supported by the development team from the Payload Operations Control Center (POCC) located at the MSFC and the Mission Control Center at NASA's Johnson Space Flight Center in Houston, Texas.
International Space Station (ISS)
2001-07-15
At the control of Expedition Two Flight Engineer Susan B. Helms, the newly-installed Canadian-built Canadarm2, Space Station Remote Manipulator System (SSRMS) maneuvers the Quest Airlock into the proper position to be mated onto the starboard side of the Unity Node I during the first of three extravehicular activities (EVA) of the STS-104 mission. The Quest Airlock makes it easier to perform space walks, and allows both Russian and American spacesuits to be worn when the Shuttle is not docked with the International Space Station (ISS). American suits will not fit through Russion airlocks at the Station. The Boeing Company, the space station prime contractor, built the 6.5-ton (5.8 metric ton) airlock and several other key components at the Marshall Space Flight Center (MSFC), in the same building where the Saturn V rocket was built. Installation activities were supported by the development team from the Payload Operations Control Center (POCC) located at the MSFC and the Mission Control Center at NASA's Johnson Space Flight Center in Houston, Texas.
46 CFR 96.05-1 - Installation and details.
Code of Federal Regulations, 2013 CFR
2013-10-01
... CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Electrical Engineering and Interior Communications Systems § 96.05-1 Installation and details. (a) The installation of all systems of an electrical engineering or... be in accordance with the requirements of subchapter J (Electrical Engineering) of this chapter...
46 CFR 77.05-1 - Installation and details.
Code of Federal Regulations, 2014 CFR
2014-10-01
... MISCELLANEOUS SYSTEMS AND EQUIPMENT Electrical Engineering and Interior Communication Systems § 77.05-1 Installation and details. (a) The installation of all systems of an electrical engineering or interior... accordance with the requirements of subchapter J (Electrical Engineering) of this chapter. Systems of this...
46 CFR 77.05-1 - Installation and details.
Code of Federal Regulations, 2012 CFR
2012-10-01
... MISCELLANEOUS SYSTEMS AND EQUIPMENT Electrical Engineering and Interior Communication Systems § 77.05-1 Installation and details. (a) The installation of all systems of an electrical engineering or interior... accordance with the requirements of subchapter J (Electrical Engineering) of this chapter. Systems of this...
46 CFR 96.05-1 - Installation and details.
Code of Federal Regulations, 2012 CFR
2012-10-01
... CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Electrical Engineering and Interior Communications Systems § 96.05-1 Installation and details. (a) The installation of all systems of an electrical engineering or... be in accordance with the requirements of subchapter J (Electrical Engineering) of this chapter...
46 CFR 77.05-1 - Installation and details.
Code of Federal Regulations, 2010 CFR
2010-10-01
... MISCELLANEOUS SYSTEMS AND EQUIPMENT Electrical Engineering and Interior Communication Systems § 77.05-1 Installation and details. (a) The installation of all systems of an electrical engineering or interior... accordance with the requirements of subchapter J (Electrical Engineering) of this chapter. Systems of this...
46 CFR 96.05-1 - Installation and details.
Code of Federal Regulations, 2014 CFR
2014-10-01
... CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Electrical Engineering and Interior Communications Systems § 96.05-1 Installation and details. (a) The installation of all systems of an electrical engineering or... be in accordance with the requirements of subchapter J (Electrical Engineering) of this chapter...
46 CFR 96.05-1 - Installation and details.
Code of Federal Regulations, 2011 CFR
2011-10-01
... CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Electrical Engineering and Interior Communications Systems § 96.05-1 Installation and details. (a) The installation of all systems of an electrical engineering or... be in accordance with the requirements of subchapter J (Electrical Engineering) of this chapter...
46 CFR 96.05-1 - Installation and details.
Code of Federal Regulations, 2010 CFR
2010-10-01
... CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Electrical Engineering and Interior Communications Systems § 96.05-1 Installation and details. (a) The installation of all systems of an electrical engineering or... be in accordance with the requirements of subchapter J (Electrical Engineering) of this chapter...
46 CFR 77.05-1 - Installation and details.
Code of Federal Regulations, 2011 CFR
2011-10-01
... MISCELLANEOUS SYSTEMS AND EQUIPMENT Electrical Engineering and Interior Communication Systems § 77.05-1 Installation and details. (a) The installation of all systems of an electrical engineering or interior... accordance with the requirements of subchapter J (Electrical Engineering) of this chapter. Systems of this...
46 CFR 77.05-1 - Installation and details.
Code of Federal Regulations, 2013 CFR
2013-10-01
... MISCELLANEOUS SYSTEMS AND EQUIPMENT Electrical Engineering and Interior Communication Systems § 77.05-1 Installation and details. (a) The installation of all systems of an electrical engineering or interior... accordance with the requirements of subchapter J (Electrical Engineering) of this chapter. Systems of this...
78 FR 23685 - Airworthiness Directives; The Boeing Company
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-22
... installing new operational software for the electrical load management system and configuration database. The..., installing a new electrical power control panel, and installing new operational software for the electrical load management system and configuration database. Since the proposed AD was issued, we have received...
USDA's Vick tells radio audience wind farms mean huge water savings
USDA-ARS?s Scientific Manuscript database
Since most of the electricity in the U.S. is generated using coal and natural gas as fuel, almost every wind farm announcement includes the estimated amount of carbon dioxide which was not released to the atmosphere. According to Wikipedia, 2.25 tons of CO2 and 1.14 tons of CO2 were released for eve...
Ground Vehicle Power and Mobility (GVPM) Powertrain Overview
2011-08-11
efficient on-board electrical power generation • Improved Fuel Efficiency • Thermoelectric Waste Heat Recovery • Advanced Engine Cycle Demo...Thermal Management • Militarized Power train Control Module and strategies devices for military vehicle transmissions FY11 FY12 FY13...Transmission): - Medium Combat Application (20-40 tons) - Medium Tactical Application (15-30 tons) Thermoelectric Waste Heat Recovery Energy Analysis
30 CFR 250.1628 - Design, installation, and operation of production systems.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Systems; (3) Electrical system information including a plan of each platform deck, outlining all hazardous... Electrical Installations at Petroleum Facilities Classified as Class I, Division 1 and Division 2, or API RP 505, Recommended Practice for Classification of Locations for Electrical Installations at Petroleum...
46 CFR 182.540 - Ballast systems.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 7 2014-10-01 2014-10-01 false Ballast systems. 182.540 Section 182.540 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) MACHINERY INSTALLATION Bilge and Ballast Systems § 182.540 Ballast systems. (a) Ballast piping must not be...
46 CFR 182.540 - Ballast systems.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 7 2013-10-01 2013-10-01 false Ballast systems. 182.540 Section 182.540 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) MACHINERY INSTALLATION Bilge and Ballast Systems § 182.540 Ballast systems. (a) Ballast piping must not be...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 7 2012-10-01 2012-10-01 false Ballast. 178.510 Section 178.510 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) INTACT STABILITY AND SEAWORTHINESS Special Installations § 178.510 Ballast. (a) Any solid fixed ballast used to comply...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 7 2014-10-01 2014-10-01 false Ballast. 178.510 Section 178.510 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) INTACT STABILITY AND SEAWORTHINESS Special Installations § 178.510 Ballast. (a) Any solid fixed ballast used to comply...
46 CFR 184.704 - Marine sanitation devices.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 7 2011-10-01 2011-10-01 false Marine sanitation devices. 184.704 Section 184.704... TONS) VESSEL CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Miscellaneous § 184.704 Marine sanitation devices. A vessel with installed toilet facilities must have a marine sanitation device that complies with...
46 CFR 184.704 - Marine sanitation devices.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 7 2014-10-01 2014-10-01 false Marine sanitation devices. 184.704 Section 184.704... TONS) VESSEL CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Miscellaneous § 184.704 Marine sanitation devices. A vessel with installed toilet facilities must have a marine sanitation device that complies with...
46 CFR 184.704 - Marine sanitation devices.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 7 2010-10-01 2010-10-01 false Marine sanitation devices. 184.704 Section 184.704... TONS) VESSEL CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Miscellaneous § 184.704 Marine sanitation devices. A vessel with installed toilet facilities must have a marine sanitation device that complies with...
46 CFR 184.704 - Marine sanitation devices.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 7 2013-10-01 2013-10-01 false Marine sanitation devices. 184.704 Section 184.704... TONS) VESSEL CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Miscellaneous § 184.704 Marine sanitation devices. A vessel with installed toilet facilities must have a marine sanitation device that complies with...
46 CFR 184.704 - Marine sanitation devices.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 7 2012-10-01 2012-10-01 false Marine sanitation devices. 184.704 Section 184.704... TONS) VESSEL CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Miscellaneous § 184.704 Marine sanitation devices. A vessel with installed toilet facilities must have a marine sanitation device that complies with...
46 CFR 182.540 - Ballast systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 7 2010-10-01 2010-10-01 false Ballast systems. 182.540 Section 182.540 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) MACHINERY INSTALLATION Bilge and Ballast Systems § 182.540 Ballast systems. (a) Ballast piping must not be...
Report to Congress on Energy Security Initiatives
2008-10-01
the Department. Naval Base Ventura County installed an 87 kilowatt rooftop amorphous silicon thin-film photovoltaic (PV) laminate system on a...on a military 5-ton flatbed trailer. The units were deployed in May 2008 and are undergoing a 90 day evaluation in theater. The demonstration is off
30 CFR 250.1628 - Design, installation, and operation of production systems.
Code of Federal Regulations, 2014 CFR
2014-07-01
... Systems (as incorporated by reference in § 250.198); (3) Electrical system information including a plan of... Practice for Classification of Locations for Electrical Installations at Petroleum Facilities Classified as... for Electrical Installations at Petroleum Facilities Classified as Class I, Zone 0, Zone 1, and Zone 2...
30 CFR 250.802 - Design, installation, and operation of surface production-safety systems.
Code of Federal Regulations, 2011 CFR
2011-07-01
... and electrical systems to be installed were approved by registered professional engineers. After these... reference as specified in § 250.198). (4) Electrical system information including the following: (i) A plan... Practice for Classification of Locations for Electrical Installations at Petroleum Facilities Classified as...
30 CFR 250.1628 - Design, installation, and operation of production systems.
Code of Federal Regulations, 2012 CFR
2012-07-01
... Systems (as incorporated by reference in § 250.198); (3) Electrical system information including a plan of... Practice for Classification of Locations for Electrical Installations at Petroleum Facilities Classified as... for Electrical Installations at Petroleum Facilities Classified as Class I, Zone 0, Zone 1, and Zone 2...
30 CFR 250.1628 - Design, installation, and operation of production systems.
Code of Federal Regulations, 2013 CFR
2013-07-01
... Systems (as incorporated by reference in § 250.198); (3) Electrical system information including a plan of... Practice for Classification of Locations for Electrical Installations at Petroleum Facilities Classified as... for Electrical Installations at Petroleum Facilities Classified as Class I, Zone 0, Zone 1, and Zone 2...
Air emissions assessment from offshore oil activities in Sonda de Campeche, Mexico.
Schifter, I; González-Macías, C; Miranda, A; López-Salinas, E
2005-10-01
Air emission data from offshore oil platforms, gas and oil processing installations and contribution of marine activities at the Sonda de Campeche, located at the Gulf of Mexico, were compiled and integrated to facilitate the study of long range transport of pollutants into the region. From this important region, roughly 76% of the total Mexican oil and gas production is obtained. It was estimated that the total air emissions of all contaminants are approximately 821,000 tons per year. Hydrocarbons are the largest pollutant emissions with 277,590 tons per year, generated during flaring activities, and SOx in second place with 185,907 tons per year. Marine and aviation activities contribute with less than 2% of total emissions. Mass of pollutants emitted per barrel of petroleum produced calculated in this work, are in the range reported by similar oil companies.
2001-05-01
A convoy of specialized support vehicles follow the Space Shuttle Endeavour as it is towed up a taxiway at NASA's Dryden Flight Research Center on Edwards Air Force Base, California, after landing on May 1, 2001. The two largest vehicles trailing the shuttle provide electrical power and air conditioning to the shuttle's systems during post-flight recovery operations. The Endeavour had just completed mission STS-100, an almost 12-day mission to install the Canadarm 2 robotic arm and deliver some three tons of supplies and experiments to the International Space Station. The landing was the 48th shuttle landing at Edwards since shuttle flights began in 1981. After post-flight processing, the Endeavour was mounted atop one of NASA's modified Boeing 747 shuttle carrier aircraft and ferried back to the Kennedy Space Center in Florida on May 8, 2001.
2002-03-12
KENNEDY SPACE CENTER, FLA. -- Space Shuttle Atlantis is hard down on the launch pad after its mid-day rollout from the Vehicle Assembly Building. Part of the Fixed Service Structure is at left. On either side of the tail of Atlantis are the tail service masts, which support the fluid, gas and electrical requirements of the orbiter's liquid oxygen and liquid hydrogen aft T-0 umbilicals. Atlantis is scheduled for launch April 4 on mission STS-110, which will install the S0 truss, the framework that eventually will hold the power and cooling systems needed for future international research laboratories on the International Space Station. The Canadarm2 robotic arm will be used exclusively to hoist the 13-ton truss from the payload bay to the Station. The S0 truss will be the first major U.S. component launched to the Station since the addition of the Quest airlock in July 2001. The four spacewalks planned for the construction will all originate from the airlock. The mission will be Atlantis' 25th trip to space
International Space Station (ISS)
2000-12-07
In this image, STS-97 astronaut and mission specialist Carlos I. Noriega waves at a crew member inside Endeavor's cabin during the mission's final session of Extravehicular Activity (EVA). Launched aboard the Space Shuttle Orbiter Endeavor on November 30, 2000, the STS-97 mission's primary objective was the delivery, assembly, and activation of the U.S. electrical power system onboard the International Space Station (ISS). The electrical power system, which is built into a 73-meter (240-foot) long solar array structure consists of solar arrays, radiators, batteries, and electronics. The entire 15.4-metric ton (17-ton) package is called the P6 Integrated Truss Segment, and is the heaviest and largest element yet delivered to the station aboard a space shuttle. The electrical system will eventually provide the power necessary for the first ISS crews to live and work in the U.S. segment.
2000-11-30
Back dropped by a cloudless blue sky, Space Shuttle Endeavor stands ready for launch after the rollback of the Rotating Service Structure, at left. The orbiter launched that night carrying the STS-97 crew of five. The STS-97 mission's primary objective was the delivery, assembly, and activation of the U.S. electrical power system onboard the International Space Station (ISS). The electrical power system, which is built into a 73-meter (240-foot) long solar array structure, consists of solar arrays, radiators, batteries, and electronics. The entire 15.4-metric ton (17-ton) package is called the P6 Integrated Truss Segment, and is the heaviest and largest element yet delivered to the station aboard a space shuttle. The electric system will eventually provide the power necessary for the first ISS crews to live and work in the U.S. segment.
NASA Astrophysics Data System (ADS)
Hart, Matthew
This paper develops scenarios of future rare-earth-magnet metal (neodymium, dysprosium, terbium, and praseodymium) consumption in the permanent magnets used in wind turbines and hybrid electric vehicles. The scenarios start with naive base-case scenarios for growth in wind-turbine and hybrid-electric-vehicle sales over the period 2011 to 2020, using historical data for each good. These naive scenarios assume that future growth follows time trends in historical data and does not depend on any exogenous variable. Specifically, growth of each technological market follows historical time trends, and the amount of rare earths used per unit of technology remains fixed. The chosen reference year is 2010. Implied consumptions of the rare earth magnet metals are calculated from these scenarios. Assumptions are made for the material composition of permanent magnets, the market share of permanent-magnet wind turbines and vehicles, and magnet weight per unit of technology. Different scenarios estimate how changes in factors like the material composition of magnets, growth of the economy, and the price of a substitute could affect future consumption. Each scenario presents a different method for reducing rare earth consumption and could be interpreted as potential policy choices. In 2010, the consumption (metric tons, rare-earth-oxide equivalent) of each rare-earth-magnet metal was as follows. Total neodymium consumption in the world for both technologies was 995 tons; dysprosium consumption was 133 tons; terbium consumption was 50 tons; praseodymium consumption was zero tons. The base scenario for wind turbines shows there could be strong, exponential growth in the global wind turbine market. New U.S. sales of hybrid vehicles would decline (in line with the current economic recession) while non-U.S. sales increase through 2020. There would be an overall increase in the total amount of magnetic rare earths consumed in the world. Total consumption of each rare earth in the short-term (2015) and mid-term (2020) scenarios could be between: 1,984 to 6,475 tons (2015) and 3,487 to 13,763 tons (2020) of neodymium; 331 to 864 tons (2015) and 587 to 1,834 tons (2020) of dysprosium; 123 to 325 tons (2015) and 219 to 687 tons (2020) of terbium; finally, zero to 871 tons (2015) and zero to 1,493 tons (2020) of praseodymium. Hybrid vehicle sales in non-U.S. countries could account for a large portion of magnetic rare earth consumption. Wind turbine and related rare earth consumption growth will also be driven by non-U.S. countries, especially developing nations like China. Despite wind turbines using bigger magnets, the sheer volume of hybrids sold and non-U.S. consumers could account for most future consumption of permanent magnets and their rare earths.
Solar Cogeneration of Electricity and Hot Water at DoD Installations
2014-06-01
EW-201248) Solar Cogeneration of Electricity and Hot Water at DoD Installations June 2014 This report was prepared under contract to the...2014 ESTCP COST AND PERFORMANCE REPORT Solar Cogeneration of Electricity and Hot Water at DoD Installations W912HQ-12-C-0053 EW-201248Ratson...demonstrate an innovative hybrid electric/thermal solar cogeneration system, document performance and cost advantages, and develop financing models and
Department of Defense Energy Security Initiatives
2009-01-01
Ventura County installed an 87 kW rooftop amorphous silicon thin-film photovoltaic (PV) laminate system on a building in Port Hueneme, California, and...of waste into energy equal to about 100 gallons of JP-8. It is skid mounted and deployable on a military 5-ton flatbed trailer. Solid Oxide Fuel
46 CFR 129.440 - Emergency lighting.
Code of Federal Regulations, 2010 CFR
2010-10-01
... INSTALLATIONS Lighting Systems § 129.440 Emergency lighting. (a) A vessel of less than 100 gross tons must have... working (machinery) spaces below the main deck. (b) The emergency lighting required by paragraph (a) of... to an automatic battery-charger; and (4) Of enough capacity for 6 hours of continuous operation. ...
ICARUS 600 ton: A status report
NASA Astrophysics Data System (ADS)
Vignoli, C.; Arneodo, F.; Badertscher, A.; Barbieri, E.; Benetti, P.; di Tigliole, A. Borio; Brunetti, R.; Bueno, A.; Calligarich, E.; Campanelli, M.; Carli, F.; Carpanese, C.; Cavalli, D.; Cavanna, F.; Cennini, P.; Centro, S.; Cesana, A.; Chen, C.; Chen, Y.; Cinquini, C.; Cline, D.; De Mitri, I.; Dolfini, R.; Favaretto, D.; Ferrari, A.; Berzolari, A. Gigli; Goudsmit, P.; He, K.; Huang, X.; Li, Z.; Lu, F.; Ma, J.; Mannocchi, G.; Mauri, F.; Mazza, D.; Mazzone, L.; Montanari, C.; Nurzia, G. P.; Otwinowski, S.; Palamara, O.; Pascoli, D.; Pepato, A.; Periale, L.; Petrera, S.; Piano-Mortari, G.; Piazzoli, A.; Picchi, P.; Pietropaolo, F.; Rancati, T.; Rappoldi, A.; Raselli, G. L.; Rebuzzi, D.; Revol, J. P.; Rico, J.; Rossella, M.; Rossi, C.; Rubbia, A.; Rubbia, C.; Sala, P.; Scannicchio, D.; Sergiampietri, F.; Suzuki, S.; Terrani, M.; Ventura, S.; Verdecchia, M.; Wang, H.; Woo, J.; Xu, G.; Xu, Z.; Zhang, C.; Zhang, Q.; Zheng, S.
2000-05-01
The goal of the ICARUS Project is the installation of a multi-kiloton LAr TPC in the underground Gran Sasso Laboratory. The programme foresees the realization of the detector in a modular way. The first step is the construction of a 600 ton module which is now at an advanced phase. It will be mounted and tested in Pavia in one year and then it will be moved to Gran Sasso for the final operation. The major cryogenic and purification systems and the mechanical components of the detector have been constructed and tested in a 10 m 3 prototype. The results of these tests are here summarized.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Im, Piljae; Malhotra, Mini; Munk, Jeffrey D.
The performance of two HVAC systems was evaluated using ORNL’s FRP, which is a two-story, 3,200 ft2 (297.3 m2) multi-zone unoccupied building that represents a typical low-rise, small office building common in the US existing building stock. The FRP is equipped with a conventional 12.5 ton (44 kW) RTU-VAV reheat system as the baseline system. For this study, a 12 ton (42 kW) VRF with a dedicated outdoor air system (DOAS) was installed to be compared with the baseline RTU system.
Liu, Gang; Bao, Jie
2017-12-01
Energy consumption and wastewater generation in cellulosic ethanol production are among the determinant factors on overall cost and technology penetration into fuel ethanol industry. This study analyzed the energy consumption and wastewater generation by the new biorefining process technology, dry acid pretreatment and biodetoxification (DryPB), as well as by the current mainstream technologies. DryPB minimizes the steam consumption to 8.63GJ and wastewater generation to 7.71tons in the core steps of biorefining process for production of one metric ton of ethanol, close to 7.83GJ and 8.33tons in corn ethanol production, respectively. The relatively higher electricity consumption is compensated by large electricity surplus from lignin residue combustion. The minimum ethanol selling price (MESP) by DryPB is below $2/gal and falls into the range of corn ethanol production cost. The work indicates that the technical and economical gap between cellulosic ethanol and corn ethanol has been almost filled up. Copyright © 2017 Elsevier Ltd. All rights reserved.
Biomass analysis at palm oil factory as an electric power plant
NASA Astrophysics Data System (ADS)
Yusniati; Parinduri, Luthfi; Krianto Sulaiman, Oris
2018-04-01
Biomassa found in palm oil mill industryis a by-product such as palm shell, fiber, empty fruit bunches and pome. The material can be used as an alternative fuel for fossil fuel. On PTPN IVpalm oil millDolokSinumbah with a capacity of 30 tons tbs/hour of palm fruit fiber and palm shells has been utilized as boiler fuel to produce steam to supplyboilers power plant. With this utilization, the use of generators that using fossil fuel can be reduced, this would provide added value for the company. From the analysis, the fiber and shell materials were sufficient to supply 18 tons/hoursteam for the boiler. Shell material even excess as much as 441,5 tons per month. By utilizing the 2 types of biomass that is available alone, the electricity needs of the factory of 734 Kwh can be met. While other materials such as empty bunches and pome can be utilized to increase the added value and profitability for the palm oil mill.
46 CFR 70.25-1 - Electrical engineering details.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 3 2013-10-01 2013-10-01 false Electrical engineering details. 70.25-1 Section 70.25-1... General Electrical Engineering Requirements § 70.25-1 Electrical engineering details. All electrical engineering details and installations shall be designed and installed in accordance with subchapter J...
46 CFR 70.25-1 - Electrical engineering details.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 3 2010-10-01 2010-10-01 false Electrical engineering details. 70.25-1 Section 70.25-1... General Electrical Engineering Requirements § 70.25-1 Electrical engineering details. All electrical engineering details and installations shall be designed and installed in accordance with subchapter J...
46 CFR 90.25-1 - Electrical engineering details.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Electrical engineering details. 90.25-1 Section 90.25-1... PROVISIONS General Electrical Engineering Requirements § 90.25-1 Electrical engineering details. (a) All electrical engineering details and installations shall be designed and installed in accordance with...
46 CFR 90.25-1 - Electrical engineering details.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Electrical engineering details. 90.25-1 Section 90.25-1... PROVISIONS General Electrical Engineering Requirements § 90.25-1 Electrical engineering details. (a) All electrical engineering details and installations shall be designed and installed in accordance with...
46 CFR 70.25-1 - Electrical engineering details.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 3 2011-10-01 2011-10-01 false Electrical engineering details. 70.25-1 Section 70.25-1... General Electrical Engineering Requirements § 70.25-1 Electrical engineering details. All electrical engineering details and installations shall be designed and installed in accordance with subchapter J...
46 CFR 70.25-1 - Electrical engineering details.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 3 2014-10-01 2014-10-01 false Electrical engineering details. 70.25-1 Section 70.25-1... General Electrical Engineering Requirements § 70.25-1 Electrical engineering details. All electrical engineering details and installations shall be designed and installed in accordance with subchapter J...
46 CFR 70.25-1 - Electrical engineering details.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 3 2012-10-01 2012-10-01 false Electrical engineering details. 70.25-1 Section 70.25-1... General Electrical Engineering Requirements § 70.25-1 Electrical engineering details. All electrical engineering details and installations shall be designed and installed in accordance with subchapter J...
46 CFR 90.25-1 - Electrical engineering details.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Electrical engineering details. 90.25-1 Section 90.25-1... PROVISIONS General Electrical Engineering Requirements § 90.25-1 Electrical engineering details. (a) All electrical engineering details and installations shall be designed and installed in accordance with...
46 CFR 90.25-1 - Electrical engineering details.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Electrical engineering details. 90.25-1 Section 90.25-1... PROVISIONS General Electrical Engineering Requirements § 90.25-1 Electrical engineering details. (a) All electrical engineering details and installations shall be designed and installed in accordance with...
46 CFR 90.25-1 - Electrical engineering details.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Electrical engineering details. 90.25-1 Section 90.25-1... PROVISIONS General Electrical Engineering Requirements § 90.25-1 Electrical engineering details. (a) All electrical engineering details and installations shall be designed and installed in accordance with...
Surface-Wave Data Acquisition and Dissemination by VHF Packet Radio and Computer Networking
1988-04-01
winter. , 4.3 Installation and Checkout The van was installed at the site by using a 3/4 ton pickup with a hydraulic tail gate; the van was simply lowered...13 ESCAPE OFF STREAMSW $7C FLOW ON STREAMCA OFF FRACK 4 STREAMCA OFF FULLDUP OFF STREAMDB OFF HEADERLN OFF TRFLOW OFFHID OFF TRIES 0 LCOK OFF TRACE...OFF RESPTIME 12 v DWAIT 1 SCREENLN 80 DIGIPEAT OFF SENDPAC SOD ECHO OFF START $11 ESCAPE OFF STOP $13 FLOW OFF STREAMSW $7C FRACK 4 STREAMCA OFF
In the aftermath of PURPA: The future of the biomass energy industry in Maine
DOE Office of Scientific and Technical Information (OSTI.GOV)
Adams, S.J.; Connors, J.F.
During the 1980`s the biomass power industry in Maine grew to nearly 500 MW of installed capacity in 21 cogeneration and stand alone plants. By 1992 these plants consumed four million tons of woody fuels annually, while providing 25% of the states` electricity supply. Moreover, this new industry supported over 2500 jobs throughout rural Maine, generated substantial local property taxes and provided a critically need management option for forest management and mill waste disposal. All of this capacity was developed by non-utility generators as Qualifying Facilities (QF) under PURPA rules. Most power contracts were fixed price, must take agreements guidedmore » by avoided cost calculations that assumed high future costs for energy alternatives. Circumstances have changed. Historically low oil prices, economic recession, and rising electricity rates have made biomass fueled power plants some of the most expensive sources of electricity on the power grid. Utilities are responding to rising rates, to public and political pressure to control costs and lower rates by seeking to renegotiate or buy out power contracts and closing biomass plants. While there are strong demands to control electricity costs, there are equally strong concerns about losing the benefits that accrue from the use of indigenous renewable resources. This article evaluates the actions of Maine utilities, independent power producers, the Maine Public Utilities Commission, and the Main Legislature related to PURPA contracts and their likely effects on the future of the biomass power industry in Maine. In particular, we will describe Maine`s new Electric Rate Stabilization Program and subsequent efforts of the Executive Branch to mediate a compromise solution in one case of a utility buy out of a biomass power plant.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ong, S.; Denholm, P.
2011-07-01
Schools in California often have a choice between multiple electricity rate options. For schools with photovoltaic (PV) installations, choosing the right rate is essential to maximize the value of PV generation. The rate option that minimizes a school?s electricity expenses often does not remain the most economical choice after the school installs a PV system. The complex interaction between PV generation, building load, and rate structure makes determining the best rate a challenging task. This report evaluates 22 rate structures across three of California?s largest electric utilities--Pacific Gas and Electric Co. (PG&E), Southern California Edison (SCE), and San Diego Gasmore » and Electric (SDG&E)--in order to identify common rate structure attributes that are favorable to PV installations.« less
46 CFR 129.200 - Design, installation, and maintenance.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Design, installation, and maintenance. 129.200 Section 129.200 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS General Requirements § 129.200 Design, installation, and maintenance. Electrical equipment on a vessel must be designed,...
46 CFR 129.200 - Design, installation, and maintenance.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Design, installation, and maintenance. 129.200 Section 129.200 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS General Requirements § 129.200 Design, installation, and maintenance. Electrical equipment on a vessel must be designed,...
Yu, Yang; Rajagopal, Ram
2015-02-17
Two dispatch protocols have been adopted by electricity markets to deal with the uncertainty of wind power but the effects of the selection between the dispatch protocols have not been comprehensively analyzed. We establish a framework to compare the impacts of adopting different dispatch protocols on the efficacy of using wind power and implementing a carbon tax to reduce emissions. We suggest that a market has high potential to achieve greater emission reduction by adopting the stochastic dispatch protocol instead of the static protocol when the wind energy in the market is highly uncertain or the market has enough adjustable generators, such as gas-fired combustion generators. Furthermore, the carbon-tax policy is more cost-efficient for reducing CO2 emission when the market operates according to the stochastic protocol rather than the static protocol. An empirical study, which is calibrated according to the data from the Electric Reliability Council of Texas market, confirms that using wind energy in the Texas market results in a 12% CO2 emission reduction when the market uses the stochastic dispatch protocol instead of the 8% emission reduction associated with the static protocol. In addition, if a 6$/ton carbon tax is implemented in the Texas market operated according to the stochastic protocol, the CO2 emission is similar to the emission level from the same market with a 16$/ton carbon tax operated according to the static protocol. Correspondingly, the 16$/ton carbon tax associated with the static protocol costs 42.6% more than the 6$/ton carbon tax associated with the stochastic protocol.
Solar Cogeneration of Electricity and Hot Water at DoD Installations
2014-05-01
the cogeneration system displaces more energy (the impact is not 4-5X because the GHG intensity factors for offsetting electricity generation and...FINAL REPORT Solar Cogeneration of Electricity and Hot Water at DoD Installations ESTCP Project EW-201248 MAY 2014 Ratson Morad... Cogeneration of Electricity and Hot Water at DoD Installations 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d
75 FR 81433 - Airworthiness Directives; Airbus Model A321-211, -212, -231, and -232 Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-28
... join individual electrical wires in the Wing Tank harness installations to in-tank equipment on QT... are used to join individual electrical wires in the Wing Tank harness installations to in-tank... electrical wires in the Wing Tank harness installations to in-tank equipment on QT circuit. The failure of a...
Industrial application of low voltage bidirectional automatic release of reserve
NASA Astrophysics Data System (ADS)
Popa, G. N.; Diniş, C. M.; Iagăr, A.; Deaconu, S. I.; Popa, I.
2018-01-01
The paper presents an analysis on low voltage industrial electrical installation controlled by bidirectional automatic release of reserve. Industrial electrical installation is for removing smoke in case of fire from a textile company. The main parts of the installation of removing smoke in case of fire are: general electrical panel; reserve electrical panel; three-phase induction motors for driven fans; electrical actuators for inlet and outlet valves; clean air inlet pipe, respectively, the outlet pipe for smoke. The operation and checking of bidirectional automatic release of reserve are present in the paper.
29 CFR 1910.308 - Special systems.
Code of Federal Regulations, 2012 CFR
2012-07-01
... OCCUPATIONAL SAFETY AND HEALTH STANDARDS Electrical Design Safety Standards for Electrical Systems § 1910.308... conductors shall be installed in rigid metal conduit, in intermediate metal conduit, in electrical metallic... are installed in an identified common mounting with electrical connections that will divide the...
29 CFR 1910.308 - Special systems.
Code of Federal Regulations, 2013 CFR
2013-07-01
... OCCUPATIONAL SAFETY AND HEALTH STANDARDS Electrical Design Safety Standards for Electrical Systems § 1910.308... conductors shall be installed in rigid metal conduit, in intermediate metal conduit, in electrical metallic... are installed in an identified common mounting with electrical connections that will divide the...
29 CFR 1910.308 - Special systems.
Code of Federal Regulations, 2014 CFR
2014-07-01
... OCCUPATIONAL SAFETY AND HEALTH STANDARDS Electrical Design Safety Standards for Electrical Systems § 1910.308... conductors shall be installed in rigid metal conduit, in intermediate metal conduit, in electrical metallic... are installed in an identified common mounting with electrical connections that will divide the...
29 CFR 1910.308 - Special systems.
Code of Federal Regulations, 2011 CFR
2011-07-01
... OCCUPATIONAL SAFETY AND HEALTH STANDARDS Electrical Design Safety Standards for Electrical Systems § 1910.308... conductors shall be installed in rigid metal conduit, in intermediate metal conduit, in electrical metallic... are installed in an identified common mounting with electrical connections that will divide the...
29 CFR 1910.308 - Special systems.
Code of Federal Regulations, 2010 CFR
2010-07-01
... OCCUPATIONAL SAFETY AND HEALTH STANDARDS Electrical Design Safety Standards for Electrical Systems § 1910.308... conductors shall be installed in rigid metal conduit, in intermediate metal conduit, in electrical metallic... are installed in an identified common mounting with electrical connections that will divide the...
Buonocore, Jonathan J; Dong, Xinyi; Spengler, John D; Fu, Joshua S; Levy, Jonathan I
2014-07-01
We estimated PM2.5-related public health impacts/ton emitted of primary PM2.5, SO2, and NOx for a set of power plants in the Mid-Atlantic and Lower Great Lakes regions of the United States, selected to include varying emission profiles and broad geographic representation. We then developed a regression model explaining variability in impacts per ton emitted using the population distributions around each plant. We linked outputs from the Community Multiscale Air Quality (CMAQ) model v 4.7.1 with census data and concentration-response functions for PM2.5-related mortality, and monetized health estimates using the value-of-statistical-life. The median impacts for the final set of plants were $130,000/ton for primary PM2.5 (range: $22,000-230,000), $28,000/ton for SO2 (range: $19,000-33,000), and $16,000/ton for NOx (range: $7100-26,000). Impacts of NOx were a median of 34% (range: 20%-75%) from ammonium nitrate and 66% (range: 25%-79%) from ammonium sulfate. The latter pathway is likely from NOx enhancing atmospheric oxidative capacity and amplifying sulfate formation, and is often excluded. Our regression models explained most of the variation in impact/ton estimates using basic population covariates, and can aid in estimating impacts averted from interventions such as pollution controls, alternative energy installations, or demand-side management. Copyright © 2014 Elsevier Ltd. All rights reserved.
Installation-Wide Energy Conservation Demonstration at Fort McClellan, Alabama
1988-11-01
Inefficient Electrical Motors 12 Dispensary Chiller Installation 12 Combustion Optimization of Gas-fired Heating Equipment 12 Infiltration Study of Family... Chiller Installation 34 5 FAMILY HOUSING .................................................... 37 Combustion Optimization of Gas-fired Heating...in Outdoor Air Ventilation 59 Replacement of Inefficient Electric Motors 59 Dispensary Chiller Installation 60 Combustion Optimization of Gas-fired
NASA Technical Reports Server (NTRS)
1962-01-01
This artist's concept from 1962 show a three hundred-sixty ton spaceship, powered by a forty-megawatt nuclear-electric power plant, transporting a three-man crew to Mars. As envisioned by Marshall Space Flight Center engineers, a five-ship convoy would make the round trip journey in about five hundred days.
40. 1911 ELECTRIC MOTOR INSTALLATION: Photocopy of July 1911 photograph ...
40. 1911 ELECTRIC MOTOR INSTALLATION: Photocopy of July 1911 photograph showing the installed 600hp General Electric motor at the Washington and Mason Streets powerhouse. View towards the south wall of the first floor. Note the engineer's shack and switchboard behind the motor and its pinion gear. - San Francisco Cable Railway, Washington & Mason Streets, San Francisco, San Francisco County, CA
International Space Station (ISS)
2000-12-07
In this image, planet Earth, some 235 statute miles away, forms the back drop for this photo of STS-97 astronaut and mission specialist Joseph R. Tanner, taken during the third of three space walks. The mission's goal was to perform the delivery, assembly, and activation of the U.S. electrical power system onboard the International Space Station (ISS). The electrical power system, which is built into a 73-meter (240-foot) long solar array structure consists of solar arrays, radiators, batteries, and electronics. The entire 15.4-metric ton (17-ton) package is called the P6 Integrated Truss Segment, and is the heaviest and largest element yet delivered to the station aboard a space shuttle. The electrical system will eventually provide the power necessary for the first ISS crews to live and work in the U.S. segment. The STS-97 crew of five launched aboard the Space Shuttle Orbiter Endeavor on November 30, 2000 for an 11 day mission.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Deenergization of self-propelled electric face... Electrical Equipment-General § 75.523-1 Deenergization of self-propelled electric face equipment installation requirements. (a) Except as provided in paragraphs (b) and (c) of this section, all self-propelled electric...
Code of Federal Regulations, 2012 CFR
2012-07-01
... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Deenergization of self-propelled electric face... Electrical Equipment-General § 75.523-1 Deenergization of self-propelled electric face equipment installation requirements. (a) Except as provided in paragraphs (b) and (c) of this section, all self-propelled electric...
Code of Federal Regulations, 2013 CFR
2013-07-01
... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Deenergization of self-propelled electric face... Electrical Equipment-General § 75.523-1 Deenergization of self-propelled electric face equipment installation requirements. (a) Except as provided in paragraphs (b) and (c) of this section, all self-propelled electric...
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Deenergization of self-propelled electric face... Electrical Equipment-General § 75.523-1 Deenergization of self-propelled electric face equipment installation requirements. (a) Except as provided in paragraphs (b) and (c) of this section, all self-propelled electric...
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Deenergization of self-propelled electric face... Electrical Equipment-General § 75.523-1 Deenergization of self-propelled electric face equipment installation requirements. (a) Except as provided in paragraphs (b) and (c) of this section, all self-propelled electric...
DOE Office of Scientific and Technical Information (OSTI.GOV)
M. Hoeschele, E. Weitzel
Although heat pump water heaters (HPWHs) have gained significant attention in recent years as a high efficiency electric water heating solution for single family homes, central HPWHs for commercial or multi-family applications are not as well documented in terms of measured performance and cost effectiveness. To evaluate this technology, the Alliance for Residential Building Innovation team monitored the performance of a 10.5 ton central HPWH installed on a student apartment building at the West Village Zero Net Energy Community in Davis, California. Monitoring data collected over a 16-month period were then used to validate a TRNSYS simulation model. The TRNSYSmore » model was then used to project performance in different climates using local electric rates. Results of the study indicate that after some initial commissioning issues, the HPWH operated reliably with an annual average efficiency of 2.12 (Coefficient of Performance). The observed efficiency was lower than the unit's rated efficiency, primarily due to the fact that the system rarely operated under steady-state conditions. Changes in the system configuration, storage tank sizing, and control settings would likely improve the observed field efficiency. Modeling results suggest significant energy savings relative to electric storage water heating systems (typical annual efficiencies around 0.90) providing for typical simple paybacks of six to ten years without any incentives. The economics versus gas water heating are currently much more challenging given the current low natural gas prices in much of the country. Increased market size for this technology would benefit cost effectiveness and spur greater technology innovation.« less
46 CFR 182.510 - Bilge piping system.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 7 2014-10-01 2014-10-01 false Bilge piping system. 182.510 Section 182.510 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) MACHINERY INSTALLATION Bilge and Ballast Systems § 182.510 Bilge piping system. (a) A vessel of at least 7.9...
46 CFR 182.510 - Bilge piping system.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 7 2012-10-01 2012-10-01 false Bilge piping system. 182.510 Section 182.510 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) MACHINERY INSTALLATION Bilge and Ballast Systems § 182.510 Bilge piping system. (a) A vessel of at least 7.9...
46 CFR 58.25-60 - Non-duplicated hydraulic rudder actuators.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 2 2010-10-01 2010-10-01 false Non-duplicated hydraulic rudder actuators. 58.25-60... actuators. Non-duplicated hydraulic rudder actuators may be installed in the steering-gear control systems on each vessel of less than 100,000 deadweight tons. These actuators must meet IMO A.467(XII...
49 CFR 236.1005 - Requirements for Positive Train Control systems.
Code of Federal Regulations, 2011 CFR
2011-10-01
... be determined and reported as follows: (i) The traffic density threshold of 5 million gross tons... in rail traffic such as reductions in total traffic volume or cessation of passenger or PIH service... requirement to install PTC on a low density track segment where a PTC system is otherwise required by this...
46 CFR 182.530 - Bilge high level alarms.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 7 2010-10-01 2010-10-01 false Bilge high level alarms. 182.530 Section 182.530... TONS) MACHINERY INSTALLATION Bilge and Ballast Systems § 182.530 Bilge high level alarms. (a) On a... operating station to indicate a high water level in each of the following normally unmanned spaces: (1) A...
2014-04-11
CAPE CANAVERAL, Fla. - Employees turn out during their lunchtime for a ribbon-cutting ceremony opening the new fitness trail next to the Space Station Processing Facility at NASA's Kennedy Space Center in Florida. Director of Center Operations Nancy Bray, at left, encourages the employees to join her in putting the trail to good use. The one-mile-long track will provide employees with a safe place off Kennedy's roadways to walk or run. The more than 6 tons of green waste removed to create the trail's footprint will be mulched and used for cover at Kennedy's landfill. Approximately 1,594 tons of crawler fines -- ground-up crawler rock removed from the crawlerway in the Launch Complex 39 area -- was used for the foundation of the trail. Fitness equipment has been ordered and will be installed on a concrete slab at the trail's west end. After the equipment has been installed, the slab will be coated to provide a rubberized exercise pad. At Kennedy Space Center, the health and safety of every employee is paramount. To learn more about Kennedy, visit http://www.nasa.gov/kennedy. Photo credit: NASA/Frankie Martin
2014-04-11
CAPE CANAVERAL, Fla. - Dressed for a little exercise, Deputy Program Manager of Launch Services Chuck Dovale addresses the employees who have turned out during their lunchtime for a ribbon-cutting ceremony opening the new fitness trail next to the Space Station Processing Facility at NASA's Kennedy Space Center in Florida. The one-mile-long track will provide employees with a safe place off Kennedy's roadways to walk or run. The more than 6 tons of green waste removed to create the trail's footprint will be mulched and used for cover at Kennedy's landfill. Approximately 1,594 tons of crawler fines -- ground-up crawler rock removed from the crawlerway in the Launch Complex 39 area -- was used for the foundation of the trail. Fitness equipment has been ordered and will be installed on a concrete slab at the trail's west end. After the equipment has been installed, the slab will be coated to provide a rubberized exercise pad. At Kennedy Space Center, the health and safety of every employee is paramount. To learn more about Kennedy, visit http://www.nasa.gov/kennedy. Photo credit: NASA/Frankie Martin
A review of sugarcane bagasse for second-generation bioethanol and biopower production
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bezerra, Tais Lacerda; Ragauskas, Art J.
Sugarcane bagasse is a large-volume agriculture residue that is generated on a ~540 million metric tons per year basis globally 1,2 with the top-three producing countries in Latin America being Brazil (~181 million metric ton yr –1), 3 Mexico 15 million metric ton yr –1), 4 and Colombia 7 million metric ton yr –1), 5 respectively. 6 Given sustainability concerns and the need to maximize the utilization of bioresources, the use of sugarcane bagasse is receiving significant attention in biorefining applications, as it is a promising resource for the conversion to biofuels and biopower. Lastly, this review provides a comprehensivemore » review of bagasse and its chemical constituents and on-going research into its utilization as a feedstock for cellulosic ethanol and electricity generation.« less
A review of sugarcane bagasse for second-generation bioethanol and biopower production
Bezerra, Tais Lacerda; Ragauskas, Art J.
2016-07-20
Sugarcane bagasse is a large-volume agriculture residue that is generated on a ~540 million metric tons per year basis globally 1,2 with the top-three producing countries in Latin America being Brazil (~181 million metric ton yr –1), 3 Mexico 15 million metric ton yr –1), 4 and Colombia 7 million metric ton yr –1), 5 respectively. 6 Given sustainability concerns and the need to maximize the utilization of bioresources, the use of sugarcane bagasse is receiving significant attention in biorefining applications, as it is a promising resource for the conversion to biofuels and biopower. Lastly, this review provides a comprehensivemore » review of bagasse and its chemical constituents and on-going research into its utilization as a feedstock for cellulosic ethanol and electricity generation.« less
Pollutant in palm oil production process.
Hosseini, Seyed Ehsan; Abdul Wahid, Mazlan
2015-07-01
Palm oil mill effluent (POME) is a by-product of the palm industry and it releases large amounts of greenhouse gases (GHGs). Water systems are also contaminated by POME if it is released into nonstandard ponds or rivers where it endangers the lives of fish and water fowl. In this paper, the environmental bottlenecks faced by palm oil production were investigated by analyzing the data collected from wet extraction palm oil mills (POMs) located in Malaysia. Strategies for reducing pollution and technologies for GHG reduction from the wet extraction POMs were also proposed. Average GHG emissions produced from processing 1 ton of crude palm oil (CPO) was 1100 kg CO2eq. This amount can be reduced to 200 kg CO2eq by capturing biogases. The amount of GHG emissions from open ponds could be decreased from 225 to 25 kg CO2eq/MT CPO by covering the ponds. Installation of biogas capturing system can decrease the average of chemical oxygen demand (COD) to about 17,100 mg/L and stabilizing ponds in the final step could decrease COD to 5220 mg/L. Using a biogas capturing system allows for the reduction of COD by 80% and simultaneously using a biogas capturing system and by stabilizing ponds can mitigate COD by 96%. Other ways to reduce the pollution caused by POME, including the installation of wet scrubber vessels and increasing the performance of biogas recovery and biogas upgrading systems, are studied in this paper. Around 0.87 m3 POME is produced per 1 ton palm fruit milled. POME consists of around 2% oil, 2-4% suspended solid, 94-96% water. In palm oil mills, more than 90% of GHGs were emitted from POME. From 1 ton crude palm oil, 1100 kg CO2eq GHGs are generated, which can be reduced to 200 kg CO2eq by installation of biogas capturing equipment.
Practical aspects of instrumentation system installation, volume 13
NASA Technical Reports Server (NTRS)
Borek, R. W.; Pool, A. (Editor); Sanderson, K. C. (Editor)
1981-01-01
A review of factors influencing installation of aircraft flight test instrumentation is presented. Requirements, including such factors as environment, reliability, maintainability, and system safety are discussed. The assessment of the mission profile is followed by an overview of electrical and mechanical installation factors with emphasis on shock/vibration isolation systems and standardization of the electric wiring installation, two factors often overlooked by instrumentation engineers. A discussion of installation hardware reviews the performance capabilities of wiring, connectors, fuses and circuit breakers, and a guide to proper selections is provided. The discussion of the installation is primarily concerned with the electrical wire routing, shield terminations and grounding. Also inclued are some examples of installation mistakes that could affect system accuracy. System verification procedures and special considerations such as sneak circuits, pyrotechnics, aircraft antenna patterns, and lightning strikes are discussed.
Code of Federal Regulations, 2010 CFR
2010-01-01
... PROCEDURES AND SANCTIONS Electric Power System Permits and Reports; Applications; Administrative Procedures and Sanctions Emergency Interconnection of Electric Facilities and the Transfer of Electricity to Alleviate An Emergency Shortage of Electric Power § 205.379 Application for approval of the installation of...
30 CFR 250.114 - How must I install and operate electrical equipment?
Code of Federal Regulations, 2010 CFR
2010-07-01
.... (a) You must classify all areas according to API RP 500, Recommended Practice for Classification of... Division 2, or API RP 505, Recommended Practice for Classification of Locations for Electrical... and hazards of electrical equipment. (c) You must install all electrical systems according to API RP...
Baseline tests of the AM General DJ-5E electruck electric delivery van
NASA Technical Reports Server (NTRS)
Dustin, M. O.; Tryon, H. B.; Sargent, N. B.
1977-01-01
An electric quarter ton truck designed for use as a postal delivery vehicle was tested to characterize the state of the art of electric vehicles. Vehicle performance test results are presented. It is powered by a single-module, 54 volt industrial battery through a silicon controlled rectifier continuously adjustable controller with regenerative braking applied to a direct current compound wound motor.
Wilburn, David R.
2011-01-01
The generation of electricity in the United States from wind-powered turbines is increasing. An understanding of the sources and abundance of raw materials required by the wind turbine industry and the many uses for these materials is necessary to assess the effect of this industry's growth on future demand for selected raw materials relative to the historical demand for these materials. The U.S. Geological Survey developed estimates of future requirements for raw (and some recycled) materials based on the assumption that wind energy will supply 20 percent of the electricity consumed in the United States by 2030. Economic, environmental, political, and technological considerations and trends reported for 2009 were used as a baseline. Estimates for the quantity of materials in typical "current generation" and "next generation" wind turbines were developed. In addition, estimates for the annual and total material requirements were developed based on the growth necessary for wind energy when converted in a wind powerplant to generate 20 percent of the U.S. supply of electricity by 2030. The results of the study suggest that achieving the market goal of 20 percent by 2030 would require an average annual consumption of about 6.8 million metric tons of concrete, 1.5 million metric tons of steel, 310,000 metric tons of cast iron, 40,000 metric tons of copper, and 380 metric tons of the rare-earth element neodymium. With the exception of neodymium, these material requirements represent less than 3 percent of the U.S. apparent consumption for 2008. Recycled material could supply about 3 percent of the total steel required for wind turbine production from 2010 through 2030, 4 percent of the aluminum required, and 3 percent of the copper required. The data suggest that, with the possible exception of rare-earth elements, there should not be a shortage of the principal materials required for electricity generation from wind energy. There may, however, be selective manufacturing shortages if the total demand for raw materials from all markets is greater than the available supply of these materials or the capacity of industry to manufacture components. Changing economic conditions could also affect the development schedule of anticipated capacity.
46 CFR 111.33-5 - Installation.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Installation. 111.33-5 Section 111.33-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-5 Installation. Each semiconductor rectifier system...
46 CFR 111.33-5 - Installation.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Installation. 111.33-5 Section 111.33-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-5 Installation. Each semiconductor rectifier system...
46 CFR 111.33-5 - Installation.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Installation. 111.33-5 Section 111.33-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-5 Installation. Each semiconductor rectifier system...
46 CFR 111.33-5 - Installation.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Installation. 111.33-5 Section 111.33-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-5 Installation. Each semiconductor rectifier system...
46 CFR 111.33-5 - Installation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Installation. 111.33-5 Section 111.33-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-5 Installation. Each semiconductor rectifier system...
Operation and maintenance of the Sol-Dance Building solar system. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gaultney, J.R.
1980-07-29
A 16,400 square foot general office facility has its primary heating provided by a flat plate solar system using hydronic storage and water-to-air transfer coils for distribution. Backup heat is provided by 10 individually controlled air source heat pumps ranging from 3 tons to 5 tons in capacity. These heat pumps also contain electric resistive elements for use during extremely low ambient temperatures. Cooling is also provided by the heat pumps. Each of the two buildings contains a separate domestic hot water system. Primary heat is provided by a closed loop solar unit with electric elements providing backup heat. Amore » 10,000 gallon black steel water tank provides heat storage.« less
29 CFR 1926.402 - Applicability.
Code of Federal Regulations, 2013 CFR
2013-07-01
... subpart V of this part for the construction of power distribution and transmission lines. ... electrical equipment and installations used to provide electric power and light at the jobsite. These... installations used for the generation, transmission, and distribution of electric energy, including related...
29 CFR 1926.402 - Applicability.
Code of Federal Regulations, 2012 CFR
2012-07-01
... subpart V of this part for the construction of power distribution and transmission lines. ... electrical equipment and installations used to provide electric power and light at the jobsite. These... installations used for the generation, transmission, and distribution of electric energy, including related...
30 CFR 250.114 - How must I install and operate electrical equipment?
Code of Federal Regulations, 2012 CFR
2012-07-01
... their facilities. (a) You must classify all areas according to API RP 500, Recommended Practice for... 1 and Division 2, or API RP 505, Recommended Practice for Classification of Locations for Electrical... electrical systems according to API RP 14F, Recommended Practice for Design and Installation of Electrical...
30 CFR 250.114 - How must I install and operate electrical equipment?
Code of Federal Regulations, 2014 CFR
2014-07-01
... their facilities. (a) You must classify all areas according to API RP 500, Recommended Practice for... 1 and Division 2, or API RP 505, Recommended Practice for Classification of Locations for Electrical... electrical systems according to API RP 14F, Recommended Practice for Design and Installation of Electrical...
30 CFR 250.114 - How must I install and operate electrical equipment?
Code of Federal Regulations, 2013 CFR
2013-07-01
... their facilities. (a) You must classify all areas according to API RP 500, Recommended Practice for... 1 and Division 2, or API RP 505, Recommended Practice for Classification of Locations for Electrical... electrical systems according to API RP 14F, Recommended Practice for Design and Installation of Electrical...
Code of Federal Regulations, 2011 CFR
2011-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING GENERAL PROVISIONS Applicability § 110.01-1 General. (a) This subchapter applies to all electrical installations on vessels subject to... electrical installation to be in accordance with this subchapter. (b) This subchapter applies only to...
Code of Federal Regulations, 2014 CFR
2014-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING GENERAL PROVISIONS Applicability § 110.01-1 General. (a) This subchapter applies to all electrical installations on vessels subject to... electrical installation to be in accordance with this subchapter. (b) This subchapter applies only to...
Code of Federal Regulations, 2010 CFR
2010-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING GENERAL PROVISIONS Applicability § 110.01-1 General. (a) This subchapter applies to all electrical installations on vessels subject to... electrical installation to be in accordance with this subchapter. (b) This subchapter applies only to...
Anshu Priya; Hait, Subrata
2018-05-01
Comprehensive characterization of printed circuit board (PCB) of end-of-life electrical and electronic equipment (EEE) is obligatory for prospective profitable beneficiation. In this study, beneficiation oriented comprehensive characterization of two brands of PCBs each of 16 end-of-life EEE was conducted in terms of their physicochemical characteristics with special emphasis on the content of 16 general elements, 2 precious metals and 15 rare earth elements (REEs). General elements and their highest weight percent composition found in different PCBs of the EEEs were Cu (23% in laptop), Al (6% in computer), Pb (15% in DVD player) and Ba (7% in TV). The high abundant of precious metals such as Au (316 g/ton) and Ag (636 g/ton) in mobile phone and laptop, respectively coupled with rapid obsolescence age makes waste PCBs of information technology and telecommunication equipment the most potent resource reservoir. Additionally, most of the waste PCBs were observed to contain REEs in considerable quantity with Sc up to 31 g/ton and Ce up to 13 g/ton being the major constituents. Comprehensive characterization of waste PCBs therefore will systematically help towards better understanding of e-waste recycling processes for beneficiation purpose and sustainable resource circulation and conservation. Copyright © 2018 Elsevier Ltd. All rights reserved.
U.S. Naval Forces, Vietnam Historical Summary for June 1966
1966-09-06
At 0615 divers inspected the underwater body and installed temporary plywood patches, A aalvci^o pmp und eductora woio uacd to dowator the...Vietnam. The ship was about 30 osters in length and 4 meters in width and has a tonnage of about 60 tons and its hull is painted grey. It bears no
46 CFR 111.30-1 - Location and installation.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Location and installation. 111.30-1 Section 111.30-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-1 Location and installation. Each switchboard must meet the...
46 CFR 111.30-1 - Location and installation.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Location and installation. 111.30-1 Section 111.30-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-1 Location and installation. Each switchboard must meet the...
46 CFR 111.30-1 - Location and installation.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Location and installation. 111.30-1 Section 111.30-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-1 Location and installation. Each switchboard must meet the...
46 CFR 111.30-1 - Location and installation.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Location and installation. 111.30-1 Section 111.30-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-1 Location and installation. Each switchboard must meet the...
46 CFR 111.30-1 - Location and installation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Location and installation. 111.30-1 Section 111.30-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-1 Location and installation. Each switchboard must meet the...
NASA Astrophysics Data System (ADS)
Cohen, Stuart M.; Chalmers, Hannah L.; Webber, Michael E.; King, Carey W.
2011-04-01
This work analyses the carbon dioxide (CO2) capture system operation within the Electric Reliability Council of Texas (ERCOT) and Great Britain (GB) electric grids using a previously developed first-order hourly electricity dispatch and pricing model. The grids are compared in their 2006 configuration with the addition of coal-based CO2 capture retrofits and emissions penalties from 0 to 100 US dollars per metric ton of CO2 (USD/tCO2). CO2 capture flexibility is investigated by comparing inflexible CO2 capture systems to flexible ones that can choose between full- and zero-load CO2 capture depending on which operating mode has lower costs or higher profits. Comparing these two grids is interesting because they have similar installed capacity and peak demand, and both are isolated electricity systems with competitive wholesale electricity markets. However, differences in capacity mix, demand patterns, and fuel markets produce diverging behaviours of CO2 capture at coal-fired power plants. Coal-fired facilities are primarily base load in ERCOT for a large range of CO2 prices but are comparably later in the dispatch order in GB and consequently often supply intermediate load. As a result, the ability to capture CO2 is more important for ensuring dispatch of coal-fired facilities in GB than in ERCOT when CO2 prices are high. In GB, higher overall coal prices mean that CO2 prices must be slightly higher than in ERCOT before the emissions savings of CO2 capture offset capture energy costs. However, once CO2 capture is economical, operating CO2 capture on half the coal fleet in each grid achieves greater emissions reductions in GB because the total coal-based capacity is 6 GW greater than in ERCOT. The market characteristics studied suggest greater opportunity for flexible CO2 capture to improve operating profits in ERCOT, but profit improvements can be offset by a flexibility cost penalty.
46 CFR 76.27-15 - Operation and installation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 3 2010-10-01 2010-10-01 false Operation and installation. 76.27-15 Section 76.27-15... EQUIPMENT Electric Fire Detecting System, Details § 76.27-15 Operation and installation. (a) The system... system. (e) All wiring and electrical circuits and equipment shall meet the applicable requirements of...
24 CFR 3280.208 - Smoke alarm requirements.
Code of Federal Regulations, 2010 CFR
2010-04-01
... basement and must install at the factory an electrical junction box for the installation of this smoke... when a home is equipped or designed for future installation of a roof-mounted evaporative cooler or... system must be mounted on an electrical outlet box and connected by a permanent wiring method to a...
Comparative study on life cycle environmental impact assessment of copper and aluminium cables
NASA Astrophysics Data System (ADS)
Bao, Wei; Lin, Ling; Song, Dan; Guo, Huiting; Chen, Liang; Sun, Liang; Liu, Mei; Chen, Jianhua
2017-11-01
With the rapid development of industrialization and urbanization in China, domestic demands for copper and aluminium resources increase continuously and the output of copper and aluminium minerals rises steadily. The output of copper in China increased from 0.6 million tons (metal quantity) in 2003 to 1.74 million tons (metal quantity) in 2014, and the output of bauxite increased from 21 million tons in 2006 to 59.21 million tons in 2014. In the meantime, the import of copper and aluminium minerals of China is also on a rise. The import of copper concentrate and bauxite increased from 4.94 million tons and 9.68 million tons in 2006 to 10.08 million tons and 70.75 million tons in 2013 respectively. Copper and aluminium resources are widely applied in fields such as construction, electrical and electronics, machinery manufacturing, and transportation, and serve as important material basis for the national economic and social development of China. Cable industry is a typical industry where copper and aluminium resources are widely used. In this paper, a product assessment model is built from the perspective of product life cycle. Based on CNLCD database, differences in environmental impacts of copper and aluminium cables are analyzed from aspects such as resource acquisition, product production, transportation, utilization, and resource recycling. Furthermore, the advantages and disadvantages of products at different stages with different types of environmental impact are analyzed, so as to provide data support for cable industry in terms of product design and production, etc.
30 CFR 75.340 - Underground electrical installations.
Code of Federal Regulations, 2012 CFR
2012-07-01
... electrical installations. (a) Underground transformer stations, battery charging stations, substations... with transformers that are either dry-type or contain nonflammable liquid, if they are located at or...
30 CFR 75.340 - Underground electrical installations.
Code of Federal Regulations, 2014 CFR
2014-07-01
... electrical installations. (a) Underground transformer stations, battery charging stations, substations... with transformers that are either dry-type or contain nonflammable liquid, if they are located at or...
30 CFR 75.340 - Underground electrical installations.
Code of Federal Regulations, 2013 CFR
2013-07-01
... electrical installations. (a) Underground transformer stations, battery charging stations, substations... with transformers that are either dry-type or contain nonflammable liquid, if they are located at or...
30 CFR 75.340 - Underground electrical installations.
Code of Federal Regulations, 2011 CFR
2011-07-01
... electrical installations. (a) Underground transformer stations, battery charging stations, substations... with transformers that are either dry-type or contain nonflammable liquid, if they are located at or...
30 CFR 75.340 - Underground electrical installations.
Code of Federal Regulations, 2010 CFR
2010-07-01
... electrical installations. (a) Underground transformer stations, battery charging stations, substations... with transformers that are either dry-type or contain nonflammable liquid, if they are located at or...
Energy production for environmental issues in Turkey
NASA Astrophysics Data System (ADS)
Yuksel, Ibrahim; Arman, Hasan; Halil Demirel, Ibrahim
2017-11-01
Due to the diversification efforts of energy sources, use of natural gas that was newly introduced into Turkish economy, has been growing rapidly. Turkey has large reserves of coal, particularly of lignite. The proven lignite reserves are 8.0 billion tons. The estimated total possible reserves are 30 billion tons. Turkey, with its young population and growing energy demand per person, its fast growing urbanization, and its economic development, has been one of the fast growing power markets of the world for the last two decades. It is expected that the demand for electric energy in Turkey will be 580 billion kWh by the year 2020. Turkey's electric energy demand is growing about 6-8% yearly due to fast economic growing. This paper deals with energy demand and consumption for environmental issues in Turkey.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schenone, G.
The paper presents a synthesis of the main results of the research program promoted by ENEL (Italian Electric Company) on herbaceous energy crops. The objective of the program is to evaluate the potentials of different species and cultivars for biomass fuel production in Italy. For the most promising species, all the links of the chain from cultivation to delivery at the plant gate at the lowest possible cost have to be organized. So far the following species gave annual productivities above 20 dry tons/ha: fiber sorghum (Sorghum sp.); miscanthus (Miscanthus sinensis); and giant reed (Arundo donax). The highest biomass yields,more » well above 40 dry tons/ha in several trials, were given by giant reed.« less
Solar power satellite system definition study. Volume 5: Space transportation analysis, phase 3
NASA Technical Reports Server (NTRS)
1980-01-01
A small Heavy Lift Launch Vehicle (HLLV) for the Solar Power Satellites (SPS) System was analyzed. It is recommended that the small HLLV with a payload of 120 metric tons be adopted as the SPS launch vehicle. The reference HLLV, a shuttle-derived option with a payload of 400 metric tons, should serve as a backup and be examined further after initial flight experience. The electric orbit transfer vehicle should be retained as the reference orbit-to-orbit cargo system.
Narrow-Band Processing and Fusion Approach for Explosive Hazard Detection in FLGPR
2011-01-01
Keller, K. C. Ho, Tuan T. Ton, David C. Wong, Mehrdad Soumekh University of Missouri - Columbia Office of Sponsored Programs The Curators of the...Timothy C. Havens* a , James M. Keller a , K.C. Ho a , Tuan T. Ton b , David C. Wong b , and Mehrdad Soumekh c a Dept. of Electrical and Computer...ARO. REFERENCES [1] Cremer , F., Schavemaker, J.G., de Jong, W., and Schutte, K., "Comparison of vehicle-mounted forward-looking polarimetric
International Space Station (ISS)
2000-12-05
Astronaut Joseph R. Tanner, STS-97 mission specialist, is seen during a session of Extravehicular Activity (EVA), performing work on the International Space Station (ISS). Part of the Remote Manipulator System (RMS) arm and a section of the newly deployed solar array panel are in the background. The primary objective of the STS-97 mission was the delivery, assembly, and activation of the U.S. electrical power system on board the ISS. The electrical power system, which is built into a 73-meter (240-foot) long solar array structure consists of solar arrays, radiators, batteries, and electronics. The entire 15.4-metric ton (17-ton) package is called the P6 Integrated Truss Segment and is the heaviest and largest element yet delivered to the station aboard a space shuttle. The electrical system will eventually provide the power necessary for the first ISS crews to live and work in the U.S. segment. The STS-97 crew of five launched aboard the Space Shuttle Orbiter Endeavor on November 30, 2000 for an 11 day mission.
30 CFR 75.1002 - Installation of electric equipment and conductors; permissibility.
Code of Federal Regulations, 2010 CFR
2010-07-01
... conductors; permissibility. 75.1002 Section 75.1002 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION... Wires and Trolley Feeder Wires § 75.1002 Installation of electric equipment and conductors... equipment is located within 150 feet of pillar workings or longwall faces. (b) Electric conductors and...
30 CFR 75.1002 - Installation of electric equipment and conductors; permissibility.
Code of Federal Regulations, 2011 CFR
2011-07-01
... conductors; permissibility. 75.1002 Section 75.1002 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION... Wires and Trolley Feeder Wires § 75.1002 Installation of electric equipment and conductors... equipment is located within 150 feet of pillar workings or longwall faces. (b) Electric conductors and...
30 CFR 250.802 - Design, installation, and operation of surface production-safety systems.
Code of Federal Regulations, 2013 CFR
2013-07-01
... Production Platform Piping Systems (as incorporated by reference in § 250.198). (4) Electrical system... classified according to API RP 500, Recommended Practice for Classification of Locations for Electrical..., Recommended Practice for Classification of Locations for Electrical Installations at Petroleum Facilities...
30 CFR 250.802 - Design, installation, and operation of surface production-safety systems.
Code of Federal Regulations, 2014 CFR
2014-07-01
... Production Platform Piping Systems (as incorporated by reference in § 250.198). (4) Electrical system... classified according to API RP 500, Recommended Practice for Classification of Locations for Electrical..., Recommended Practice for Classification of Locations for Electrical Installations at Petroleum Facilities...
30 CFR 250.802 - Design, installation, and operation of surface production-safety systems.
Code of Federal Regulations, 2012 CFR
2012-07-01
... Production Platform Piping Systems (as incorporated by reference in § 250.198). (4) Electrical system... classified according to API RP 500, Recommended Practice for Classification of Locations for Electrical..., Recommended Practice for Classification of Locations for Electrical Installations at Petroleum Facilities...
46 CFR 38.15-15 - Electrical installations-TB/ALL.
Code of Federal Regulations, 2014 CFR
2014-10-01
... this chapter for tank vessels, except as otherwise specified in this part. (b) Spaces containing cargo... devices, except Coast Guard approved intrinsically safe devices, shall be installed in these spaces. Electric motors shall be segregated from these spaces by a gastight bulkhead. Electric lighting of the...
46 CFR 38.15-15 - Electrical installations-TB/ALL.
Code of Federal Regulations, 2012 CFR
2012-10-01
... this chapter for tank vessels, except as otherwise specified in this part. (b) Spaces containing cargo... devices, except Coast Guard approved intrinsically safe devices, shall be installed in these spaces. Electric motors shall be segregated from these spaces by a gastight bulkhead. Electric lighting of the...
46 CFR 38.15-15 - Electrical installations-TB/ALL.
Code of Federal Regulations, 2010 CFR
2010-10-01
... this chapter for tank vessels, except as otherwise specified in this part. (b) Spaces containing cargo... devices, except Coast Guard approved intrinsically safe devices, shall be installed in these spaces. Electric motors shall be segregated from these spaces by a gastight bulkhead. Electric lighting of the...
46 CFR 38.15-15 - Electrical installations-TB/ALL.
Code of Federal Regulations, 2011 CFR
2011-10-01
... this chapter for tank vessels, except as otherwise specified in this part. (b) Spaces containing cargo... devices, except Coast Guard approved intrinsically safe devices, shall be installed in these spaces. Electric motors shall be segregated from these spaces by a gastight bulkhead. Electric lighting of the...
46 CFR 38.15-15 - Electrical installations-TB/ALL.
Code of Federal Regulations, 2013 CFR
2013-10-01
... this chapter for tank vessels, except as otherwise specified in this part. (b) Spaces containing cargo... devices, except Coast Guard approved intrinsically safe devices, shall be installed in these spaces. Electric motors shall be segregated from these spaces by a gastight bulkhead. Electric lighting of the...
NASA Technical Reports Server (NTRS)
Martz, J. E.; Roberts, A. F.
1985-01-01
A photovoltaic (PV) system powering a grain mill and water pump was installed in the remote African village of Tangaye, Burkina Faso (formerly Upper Volta) under the sponsorship of the U.S. Agency for International Development (AID) and by the National Aeronautics and Space Administration (NASA) Lewis Research Center (LeRC) in early 1979. The presence reports covers the second two years of operation from April 1981 through June 1983. During this time, the grain mill and water pump were operational 96 and 88 percent of the time respectively, and the PV system generated sufficient electricity to enable the grinding of about 111 metric tons of finely ground flow and the pumping of over 5000 cm sq of water from the 10 m deep well. The report includes a description of the current configuration of the system, a review of system performance, a discussion of the socioeconomic impact of the system on the villagers and a summary of results and conclusions covering the entire four-year period.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Martz, J.E.; Roberts, A.F.
1985-03-01
A photovoltaic (PV) system powering a grain mill and water pump was installed in the remote African village of Tangaye, Burkina Faso (formerly Upper Volta) under the sponsorship of the U.S. Agency for International Development (AID) and by the National Aeronautics and Space Administration (NASA) Lewis Research Center (LeRC) in early 1979. The presence reports covers the second two years of operation from April 1981 through June 1983. During this time, the grain mill and water pump were operational 96 and 88 percent of the time respectively, and the PV system generated sufficient electricity to enable the grinding of aboutmore » 111 metric tons of finely ground flow and the pumping of over 5000 cm sq of water from the 10 m deep well. The report includes a description of the current configuration of the system, a review of system performance, a discussion of the socioeconomic impact of the system on the villagers and a summary of results and conclusions covering the entire four-year period.« less
Techniques for hazard analysis and their use at CERN.
Nuttall, C; Schönbacher, H
2001-01-01
CERN, The European Organisation for Nuclear Research is situated near Geneva and has its accelerators and experimental facilities astride the Swiss and French frontiers attracting physicists from all over the world to this unique laboratory. The main accelerator is situated in a 27 km underground ring and the experiments take place in huge underground caverns in order to detect the fragments resulting from the collision of subatomic particles at speeds approaching that of light. These detectors contain many hundreds of tons of flammable materials, mainly plastics in cables and structural components, flammable gases in the detectors themselves, and cryogenic fluids such as helium and argon. The experiments consume high amounts of electrical power, thus the dangers involved have necessitated the use of analytical techniques to identify the hazards and quantify the risks to personnel and the infrastructure. The techniques described in the paper have been developed in the process industries where they have been to be of great value. They have been successfully applied to CERN industrial and experimental installations and, in some cases, have been instrumental in changing the philosophy of the experimentalists and their detectors.
49 CFR 1152.32 - Calculation of avoidable costs.
Code of Federal Regulations, 2012 CFR
2012-10-01
...—CR 40-13-20 Do. Purchased services 41-13-20 Do. Other expenses 61-13-20 Do. Electric power systems.... Shop buildings—freight cars Salaries and wages 11-13-25 Do. Materials 21-13-25 Do. Repairs by others—DR... and maintenance Salaries and wages 11-21-41 Road diesel and road electric locomotive gross ton miles...
VIEW OF SHEAR (ELECTRIC POWERED), SCALE HOUSE TO LEFT. BARS ...
VIEW OF SHEAR (ELECTRIC POWERED), SCALE HOUSE TO LEFT. BARS ARE PLACED ON WEIGHING SCALE SHOWN LOWER LEFT. 15-TON CLEVELAND CRANE HANDLES BARS FOR FINAL LOADING INTO RAILROAD CARS (12" BAY) AND FOR MOVING FROM TABLE TO SHEAR TABLE. - Cambria Iron Company, Gautier Works, 12" Mill, Clinton Street & Little Conemaugh River, Johnstown, Cambria County, PA
49 CFR 1152.32 - Calculation of avoidable costs.
Code of Federal Regulations, 2013 CFR
2013-10-01
...—CR 40-13-20 Do. Purchased services 41-13-20 Do. Other expenses 61-13-20 Do. Electric power systems.... Shop buildings—freight cars Salaries and wages 11-13-25 Do. Materials 21-13-25 Do. Repairs by others—DR... and maintenance Salaries and wages 11-21-41 Road diesel and road electric locomotive gross ton miles...
49 CFR 1152.32 - Calculation of avoidable costs.
Code of Federal Regulations, 2014 CFR
2014-10-01
...—CR 40-13-20 Do. Purchased services 41-13-20 Do. Other expenses 61-13-20 Do. Electric power systems.... Shop buildings—freight cars Salaries and wages 11-13-25 Do. Materials 21-13-25 Do. Repairs by others—DR... and maintenance Salaries and wages 11-21-41 Road diesel and road electric locomotive gross ton miles...
49 CFR 1152.32 - Calculation of avoidable costs.
Code of Federal Regulations, 2010 CFR
2010-10-01
...—CR 40-13-20 Do. Purchased services 41-13-20 Do. Other expenses 61-13-20 Do. Electric power systems.... Shop buildings—freight cars Salaries and wages 11-13-25 Do. Materials 21-13-25 Do. Repairs by others—DR... and maintenance Salaries and wages 11-21-41 Road diesel and road electric locomotive gross ton miles...
49 CFR 1152.32 - Calculation of avoidable costs.
Code of Federal Regulations, 2011 CFR
2011-10-01
...—CR 40-13-20 Do. Purchased services 41-13-20 Do. Other expenses 61-13-20 Do. Electric power systems.... Shop buildings—freight cars Salaries and wages 11-13-25 Do. Materials 21-13-25 Do. Repairs by others—DR... and maintenance Salaries and wages 11-21-41 Road diesel and road electric locomotive gross ton miles...
The manufacture of steel by electric arc furnaces (EAF) is continuing to increase in usage in the United States with current production estimated to be over 63 million tons per year. The reduction of emissions from steel producers has been slow for two main reasons: the nee...
Code of Federal Regulations, 2012 CFR
2012-07-01
... ship that has approved oily-water separating equipment for the processing of oily mixtures from bilges... least one pump installed to discharge oily mixtures through a fixed piping system to a reception... to stop each pump that is used to discharge oily mixtures; and (6) The ship has a stop valve...
Code of Federal Regulations, 2014 CFR
2014-07-01
... ship that has approved oily-water separating equipment for the processing of oily mixtures from bilges... least one pump installed to discharge oily mixtures through a fixed piping system to a reception... to stop each pump that is used to discharge oily mixtures; and (6) The ship has a stop valve...
Code of Federal Regulations, 2011 CFR
2011-07-01
... ship that has approved oily-water separating equipment for the processing of oily mixtures from bilges... least one pump installed to discharge oily mixtures through a fixed piping system to a reception... to stop each pump that is used to discharge oily mixtures; and (6) The ship has a stop valve...
Code of Federal Regulations, 2013 CFR
2013-07-01
... ship that has approved oily-water separating equipment for the processing of oily mixtures from bilges... least one pump installed to discharge oily mixtures through a fixed piping system to a reception... to stop each pump that is used to discharge oily mixtures; and (6) The ship has a stop valve...
Code of Federal Regulations, 2011 CFR
2011-07-01
... the following navigational-safety equipment: (1) Marine radar. By August 2, 1997, a marine radar that... engages in towing on navigable waters of the U.S., including Western Rivers, the radar must meet— (A) The... for Marine Radar Equipment Installed on Ships of Less Than 300 Tons Gross Tonnage, RTCM Paper 71-95...
Multifamily Heat Pump Water Heater Evaluation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hoeschele, M.; Weitzel, E.
2017-03-03
Although heat pump water heaters (HPWHs) have gained significant attention in recent years as a high efficiency electric water heating solution for single family homes, central HPWHs for commercial or multi-family applications are not as well documented in terms of measured performance and cost effectiveness. To evaluate this technology, the Alliance for Residential Building Innovation team monitored the performance of a 10.5 ton central HPWH installed on a student apartment building at the West Village Zero Net Energy Community in Davis, California. Monitoring data collected over a 16 month period were then used to validate a TRNSYS simulation model. Themore » TRNSYS model was then used to project performance in different climates using local electric rates. Results of the study indicate that after some initial commissioning issues, the HPWH operated reliably with an annual average efficiency of 2.12 (Coefficient of Performance). The observed efficiency was lower than the unit's rated efficiency, primarily due to the fact that the system rarely operated under steady-state conditions. Changes in the system configuration, storage tank sizing, and control settings would likely improve the observed field efficiency. Modeling results suggest significant energy savings relative to electric storage water heating systems (typical annual efficiencies around 0.90) providing for typical simple paybacks of six to ten years without any incentives. The economics versus gas water heating are currently much more challenging given the current low natural gas prices in much of the country. Increased market size for this technology would benefit cost effectiveness and spur greater technology innovation.« less
Multifamily Heat Pump Water Heater Evaluation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hoeschele, M.; Weitzel, E.
2017-03-01
Although heat pump water heaters (HPWHs) have gained significant attention in recent years as a high efficiency electric water heating solution for single family homes, central HPWHs for commercial or multi-family applications are not as well documented in terms of measured performance and cost effectiveness. To evaluate this technology, the Alliance for Residential Building Innovation team monitored the performance of a 10.5 ton central HPWH installed on a student apartment building at the West Village Zero Net Energy Community in Davis, California. Monitoring data collected over a 16 month period were then used to validate a TRNSYS simulation model. Themore » TRNSYS model was then used to project performance in different climates using local electric rates. Results of the study indicate that after some initial commissioning issues, the HPWH operated reliably with an annual average efficiency of 2.12 (Coefficient of Performance). The observed efficiency was lower than the unit's rated efficiency, primarily due to the fact that the system rarely operated under steady-state conditions. Changes in the system configuration, storage tank sizing, and control settings would likely improve the observed field efficiency. Modeling results suggest significant energy savings relative to electric storage water heating systems (typical annual efficiencies around 0.90) providing for typical simple paybacks of six to ten years without any incentives. The economics versus gas water heating are currently much more challenging given the current low natural gas prices in much of the country. Increased market size for this technology would benefit cost effectiveness and spur greater technology innovation.« less
Building America Case Study: Multifamily Central Heat Pump Water Heaters, Davis, California
DOE Office of Scientific and Technical Information (OSTI.GOV)
Although heat pump water heaters (HPWHs) have gained significant attention in recent years as a high efficiency electric water heating solution for single family homes, central HPWHs for commercial or multi-family applications are not as well documented in terms of measured performance and cost effectiveness. To evaluate this technology, the Alliance for Residential Building Innovation team monitored the performance of a 10.5 ton central HPWH installed on a student apartment building at the West Village Zero Net Energy Community in Davis, California. Monitoring data collected over a 16-month period were then used to validate a TRNSYS simulation model. The TRNSYSmore » model was then used to project performance in different climates using local electric rates. Results of the study indicate that after some initial commissioning issues, the HPWH operated reliably with an annual average efficiency of 2.12 (Coefficient of Performance). The observed efficiency was lower than the unit's rated efficiency, primarily due to the fact that the system rarely operated under steady-state conditions. Changes in the system configuration, storage tank sizing, and control settings would likely improve the observed field efficiency. Modeling results suggest significant energy savings relative to electric storage water heating systems (typical annual efficiencies around 0.90) providing for typical simple paybacks of six to ten years without any incentives. The economics versus gas water heating are currently much more challenging given the current low natural gas prices in much of the country. Increased market size for this technology would benefit cost effectiveness and spur greater technology innovation.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-18
... detect and correct discrepancies of the battery wiring installation inside the TU, which could result in... TUs revealed battery wiring installation discrepancies inside the TU that may result in an electrical short. The AAIB noted that in case of an electrical short, the ELT battery could provide the energy for...
Easily installable behavioral monitoring system with electric field sensor.
Tsukamoto, Sosuke; Machida, Yuichiro; Kameda, Noriyuki; Hoshino, Hiroshi; Tamura, Toshiyo
2007-01-01
This paper describes a wireless behavioral monitoring system equipped with an electric field sensor. The sensor unit was designed to obtain information regarding the usage of home electric appliances such as the television, microwave oven, coffee maker, etc. by measuring the electric field surrounding them. It is assumed that these usage statistics could provide information regarding the indoor behavior of a subject. Since the sensor can be used by simply attaching it to an appliance and does not require any wiring for its installation, this system can be temporarily installed in any ordinary house. A simple interface for selecting the threshold value of appliances' power on/off states was introduced. The experimental results reveal that the proposed system can be installed by individuals in their residences in a short time and the usage statistics of home appliances can be gathered.
Lu, Xi; McElroy, Michael B; Sluzas, Nora A
2011-04-01
Wind power can make an important contribution to the goal of reducing emissions of CO2. The major problem relates to the intrinsic variability of the source and the difficulty of reconciling the supply of electricity with demand particularly at high levels of wind penetration. This challenge is explored for the case of the ERCOT system in Texas. Demand for electricity in Texas is projected to increase by approximately 60% by 2030. Considering hourly load data reported for 2006, assuming that the pattern of demand in 2030 should be similar to 2006, and adopting as a business as usual (BAU) reference an assumption that the anticipated additional electricity should be supplied by a combination of coal and gas with prices, discounted to 2007 dollars of $2 and $6 per MMBTU respectively, we conclude that the bus-bar price for electricity would increase by about 1.1 ¢/kWh at a wind penetration level of 30%, by about 3.4 ¢/kWh at a penetration level of 80%. Corresponding costs for reductions in CO2 range from $20/ton to $60/ton. A number of possibilities are discussed that could contribute to a reduction in these costs including the impact of an expanded future fleet of electrically driven vehicles.
Potential for electricity generation from biomass residues in Cuba
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lora, E.S.
The purpose of this paper is the study of the availability of major biomass residues in Cuba and the analysis of the electricity generation potential by using different technologies. An analysis of the changes in the country`s energy balance from 1988 up to date is presented, as well as a table with the availability study results and the energy equivalent for the following biomass residues: sugar cane bagasse and trash, rice and coffee husk, corn an cassava stalks and firewood. A total equivalent of 4.42 10{sup 6} tons/year of fuel-oil was obtained. Possible scenarios for the electricity production increase inmore » the sugar industry are presented too. The analysis is carried out for a high stream parameter CEST and two BIG/GT system configurations. Limitations are introduced about the minimal milling capacity of the sugar mills for each technology. The calculated {open_quotes}real{close_quotes} electricity generation potential for BIG/GT systems, based on GE LM5000 CC gas turbines, an actual cane harvest of 58.0 10{sup 6} tons/year, half the available trash utilization and an specific steam consumption of 210 kg/tc, was 18601,0 GWh/year. Finally different alternatives are presented for low-scale electricity generation based on the other available agricultural residues.« less
Code of Federal Regulations, 2013 CFR
2013-07-01
... this section does not apply to a ship that has approved oily-water separating equipment for the processing of oily mixtures from bilges or fuel oil tank ballast. (c) This section does not apply to a fixed... navigable waters of the United States unless: (1) The ship has at least one pump installed to discharge oily...
Code of Federal Regulations, 2011 CFR
2011-07-01
... this section does not apply to a ship that has approved oily-water separating equipment for the processing of oily mixtures from bilges or fuel oil tank ballast. (c) This section does not apply to a fixed... navigable waters of the United States unless: (1) The ship has at least one pump installed to discharge oily...
Code of Federal Regulations, 2012 CFR
2012-07-01
... this section does not apply to a ship that has approved oily-water separating equipment for the processing of oily mixtures from bilges or fuel oil tank ballast. (c) This section does not apply to a fixed... navigable waters of the United States unless: (1) The ship has at least one pump installed to discharge oily...
Code of Federal Regulations, 2014 CFR
2014-07-01
... this section does not apply to a ship that has approved oily-water separating equipment for the processing of oily mixtures from bilges or fuel oil tank ballast. (c) This section does not apply to a fixed... navigable waters of the United States unless: (1) The ship has at least one pump installed to discharge oily...
Classified Scrap in Lake Superior.
1977-07-08
DEPARTMENT OF THE ARMY St. Paul District, Corps of Engineers Lake Superior Area Canal Park Duluth, Minnesota 55802 THE DAILY MINING GAZETTE...ago. Lind concurred with the reference groupts recommendations that Reserve Mining Company’s discharge of 67,000 tons of taconite tailings into Lake...installation located ap- proximately 13 miles north of Minneapolis - St. Paul, Minnesota . The prime contractor at the plant is Federal Cartridge Corporation with
2008-05-01
Technicians at NASA's Dryden Aircraft Operations Facility in Palmdale, Calif., loaded the German-built primary mirror assembly of the Stratospheric Observatory for Infrared Astronomy, or SOFIA, onto an Air Force C-17 for shipment to NASA's Ames Research Center on May 1, 2008. In preparation for the final finish coating of the mirror, the more than two-ton mirror assembly had been removed from its cavity in the rear fuselage of the highly modified SOFIA Boeing 747SP two weeks earlier. After arrival at NASA Ames at Moffett Field near Mountain View, Calif., the mirror would receive its aluminized finish coating before being re-installed in the SOFIA aircraft.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Raj K. Rajamani; Jose Angel Delgadillo
A research team from the University of Utah is working to make inroads into saving energy in these SAG mills. In 2003, Industries of the Future Program of the Department of Energy tasked the University of Utah team to build a partnership between the University and the mining industry for the specific purpose of reducing energy consumption in SAG mills. A partnership was formed with Cortez Gold Mines, Kennecott Utah Copper Corporation, Process Engineering Resources Inc. and Outokumpu Technology. In the current project, Cortez Gold Mines played a key role in facilitating the 26-ft SAG mill at Cortez as amore » test mill for this study. According to plant personnel, there were a number of unscheduled shut downs to repair broken liners and the mill throughput fluctuated depending on ore type. The University team had two softwares, Millsoft and FlowMod to tackle the problem. Millsoft is capable of simulating the motion of charge in the mill. FlowMod calculates the slurry flow through the grate and pulp lifters. Based on this data the two models were fine-tuned to fit the Cortez SAG will. In the summer of 2004 a new design of shell lifters were presented to Cortez and in September 2004 these lifters were installed in the SAG mill. By December 2004 Cortez Mines realized that the SAG mill is drawing approximately 236-kW less power than before while maintaining the same level of production. In the first month there was extreme cycling and operators had to learn more. Now the power consumption is 0.3-1.3 kWh/ton lower than before. The actual SAG mill power draw is 230-370 kW lower. Mill runs 1 rpm lesser in speed on the average. The recirculation to the cone crusher is reduced by 1-10%, which means more efficient grinding of critical size material is taking place in the mill. All of the savings have resulted in reduction of operating cost be about $0.023-$0.048/ ton. After completing the shell lifter design, the pulp lifter design was taken up. Through a series of mill surveys and model calculations it was figured that the radial pulp lifter installed on the mill had less than optimum discharge capacity. A number of alternative designs were evaluated. The final choice was the Turbo Pulp Lifter for which Outukumpu Technology, Centennial, Colorado had filed a patent. After installation of the pulp lifter a 22% increase in throughput rate from 344 stph to 421 stph was realized. A 35% decrease in the SAG mill power draw from 3,908 HP to 2,526 HP (2,915 kW to 1,884 kW) was recorded. This equates to a 47% decrease in SAG unit energy consumption from 8.98 kWh/ton to 4.74 kWh/ton. A 11% decrease in SAG mill speed was observed indicating optimized ball strikes. Also, the ball chip generation from the SAG mill was reduced considerably. Further more, a 7% decrease in ball mill power draw from 4,843 HP to 4,491 HP (3,613 kW to 3,350 kW) was observed. This equates to a 24% decrease in ball mill unit energy consumption from 11.13 kWh/ton to 8.43 kWh/ton.« less
NASA Astrophysics Data System (ADS)
Pudasainee, Deepak; Kim, Jeong-Hun; Seo, Yong-Chil
2009-12-01
Regulatory control of mercury emission from anthropogenic sources has become a global concern in the recent past. Coal-fired power plants are one of the largest sources of anthropogenic mercury emission into the atmosphere. This paper summarizes the current reducing trend of mercury emission as co-beneficial effect by more stringent regulation changes to control primary air pollutants with introducing test results from the commercial coal-fired facilities and suggesting a guideline for future regulatory development in Korea. On average, mercury emission concentrations ranged 16.3-2.7 μg Sm -3, 2.4-1.1 μg Sm -3, 3.1-0.7 μg Sm -3 from anthracite coal-fired power plants equipped with electrostatic precipitator (ESP), bituminous coal-fired power plants with ESP + flue gas desulphurization (FGD) and bituminous coal-fired power plants with selective catalytic reactor (SCR) + cold side (CS) - ESP + wet FGD, respectively. Among the existing air pollution control devices, the best configuration for mercury removal in coal-fired power plants was SCR + CS - ESP + wet FGD, which were installed due to the stringent regulation changes to control primary air pollutants emission such as SO 2, NOx and dust. It was estimated that uncontrolled and controlled mercury emission from coal-fired power plants as 10.3 ton yr -1 and 3.2 ton yr -1 respectively. After the installation of ESP, FGD and SCR system, following the enforcement of the stringent regulation, 7.1 ton yr -1 of mercury emission has been reduced (nearly 69%) from coal-fired power plants as a co-benefit control. Based on the overall study, a sample guideline including emission limits were suggested which will be applied to develop a countermeasure for controlling mercury emission from coal-fired power plants.
14 CFR 25.1309 - Equipment, systems, and installations.
Code of Federal Regulations, 2010 CFR
2010-01-01
... TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Equipment General § 25.1309... electrical system and equipment design and installation, critical environmental conditions must be considered. For electrical generation, distribution, and utilization equipment required by or used in complying...
Proposed Columbia Wind Farm No. 1 : Final Environmental Impact Statement, Joint NEPA/SEPA.
DOE Office of Scientific and Technical Information (OSTI.GOV)
United States. Bonneville Power Administration; Klickitat County
1995-09-01
CARES proposes to construct and operate the 25 megawatt Columbia Wind Farm No. 1 (Project) in the Columbia Hills area of Klickitat County, Washington known as Juniper Point. Wind is not a constant resource and based on the site wind measurement data, it is estimated that the Project would generate approximately 7 average annual MWs of electricity. BPA proposes to purchase the electricity generated by the Project. CARES would execute a contractual agreement with a wind developer, to install approximately 91 wind turbines and associated facilities to generate electricity. The Project`s construction and operation would include: install concrete pier foundationsmore » for each wind turbine; install 91 model AWT-26 wind turbines using 43 m high guyed tubular towers on the pier foundations; construct a new 115/24-kv substation; construct a 149 m{sup 2} steel operations and maintenance building; install 25 pad mount transformers along the turbine access roads; install 4.0 km of underground 24 kv power collection lines to collect power from individual turbines to the end of turbine strings; install 1.2 km of underground communication and transmission lines from each turbine to a pad mount transformer; install 5.6 km of 24 kv wood pole transmission lines to deliver electricity from the pad mount transformers to the Project substation; install 3.2 km of 115 kv wood pole transmission lines to deliver electricity from the Project substation to the Public Utility District No. 1 of Klickitat County(PUD)115 kv Goldendale line; interconnect with the BPA transmission system through the Goldendale line and Goldendale substation owned by the PUD; reconstruct, upgrade, and maintain 8.0 km of existing roads; construct and maintain 6.4 km of new graveled roads along the turbine strings and to individual turbines; and install meteorological towers guyed with rebar anchors on the Project site.« less
Update on the Puerto Rico Electric Power Authority`s spinning reserve battery system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Taylor, P.A.
1996-11-01
The Puerto Rico Electric Power Authority completed start-up testing and began commercial operation of a 20MW/14MWh battery energy storage facility in April 1995. The battery system was installed to provide rapid spinning reserve and frequency control for the utility`s island electrical system. This paper outlines the needs of an island utility for rapid spinning reserve; identifies Puerto Rico`s unique challenges; reviews the technical and economic analyses that justified installation of a battery energy system; describes the storage facility that was installed; and presents preliminary operating results of the facility.
1983-11-08
cials at the AGET [General Cement Corporation]- Iraklis cement industry for fraud to a criminal degree, which caused losses of more than 100 million...gen- eral secretary, Mr. Kasimatis, of a complaint against 13 members of the Administra- tive Council and senior officials of AGET- Iraklis , Inc...deducting freight, at least five dollars a ton. It also made cash-down sales and paid off " Iraklis " in installments, and bought cement from other
Center background shows two fortyhorsepower directcurrent electric motors installed in ...
Center background shows two forty-horsepower direct-current electric motors installed in 1904 to provide power to two drive shafts for first floor machine shops. - Thomas A. Edison Laboratories, Building No. 5, Main Street & Lakeside Avenue, West Orange, Essex County, NJ
46 CFR 183.354 - Battery installations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 7 2010-10-01 2010-10-01 false Battery installations. 183.354 Section 183.354 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box solely...
46 CFR 183.354 - Battery installations.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 7 2012-10-01 2012-10-01 false Battery installations. 183.354 Section 183.354 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box solely...
46 CFR 183.354 - Battery installations.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 7 2013-10-01 2013-10-01 false Battery installations. 183.354 Section 183.354 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box solely...
46 CFR 183.354 - Battery installations.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 7 2011-10-01 2011-10-01 false Battery installations. 183.354 Section 183.354 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box solely...
46 CFR 183.354 - Battery installations.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 7 2014-10-01 2014-10-01 false Battery installations. 183.354 Section 183.354 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box solely...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sandstrom, Matthew M.
2012-03-30
This is the final report for a grant-funded project to financially assist and otherwise provide support to projects that increase E85 infrastructure in Michigan at retail fueling locations. Over the two-year project timeframe, nine E85 and/or flex-fuel pumps were installed around the State of Michigan at locations currently lacking E85 infrastructure. A total of five stations installed the nine pumps, all providing cost share toward the project. By using cost sharing by station partners, the $200,000 provided by the Department of Energy facilitated a total project worth $746,332.85. This project was completed over a two-year timetable (eight quarters). The firstmore » quarter of the project focused on project outreach to station owners about the incentive on the installation and/or conversion of E85 compatible fueling equipment including fueling pumps, tanks, and all necessary electrical and plumbing connections. Utilizing Clean Energy Coalition (CEC) extensive knowledge of gasoline/ethanol infrastructure throughout Michigan, CEC strategically placed these pumps in locations to strengthen the broad availability of E85 in Michigan. During the first and second quarters, CEC staff approved projects for funding and secured contracts with station owners; the second through eighth quarters were spent working with fueling station owners to complete projects; the third through eighth quarters included time spent promoting projects; and beginning in the second quarter and running for the duration of the project was spent performing project reporting and evaluation to the US DOE. A total of 9 pumps were installed (four in Elkton, two in Sebewaing, one in East Lansing, one in Howell, and one in Whitmore Lake). At these combined station locations, a total of 192,445 gallons of E85, 10,786 gallons of E50, and 19,159 gallons of E30 were sold in all reporting quarters for 2011. Overall, the project has successfully displaced 162,611 gallons (2,663 barrels) of petroleum, and reduced regional GHG emissions by 375 tons in the first year of station deployment.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Conklin, Shane
2013-09-30
Shell space fit out included faculty office advising space, student study space, staff restroom and lobby cafe. Electrical, HVAC and fire alarm installations and upgrades to existing systems were required to support the newly configured spaces. These installations and upgrades included audio/visual equipment, additional electrical outlets and connections to emergency generators. The project provided increased chilled water capacity with the addition of an electric centrifugal chiller. Upgrades associated with chiller included upgrade of exhaust ventilation fan, electrical conductor and breaker upgrades, piping and upgrades to air handling equipment.
Simulation study on electric field intensity above train roof
NASA Astrophysics Data System (ADS)
Fan, Yizhe; Li, Huawei; Yang, Shasha
2018-04-01
In order to understand the distribution of electric field in the space above the train roof accurately and select the installation position of the detection device reasonably, in this paper, the 3D model of pantograph-catenary is established by using SolidWorks software, and the spatial electric field distribution of pantograph-catenary model is simulated based on Comsol software. According to the electric field intensity analysis within the 0.4m space above train roof, we give a reasonable installation of the detection device.
46 CFR 116.610 - Ventilation ducts.
Code of Federal Regulations, 2010 CFR
2010-10-01
... incidental to its installation, must be made of noncombustible material. (c) Combustibles and other foreign materials are not allowed within ventilation ducts. However, metal piping and electrical wiring installed in... the wiring does not interfere with the operation of fire dampers. Electrical wiring and piping may not...
Waste-to-Chemicals for a Circular Economy: The Case of Urea Production (Waste-to-Urea).
Antonetti, Elena; Iaquaniello, Gaetano; Salladini, Annarita; Spadaccini, Luca; Perathoner, Siglinda; Centi, Gabriele
2017-03-09
The economics and environmental impact of a new technology for the production of urea from municipal solid waste, particularly the residue-derived fuel (RdF) fraction, is analyzed. Estimates indicate a cost of production of approximately €135 per ton of urea (internal rate of return more than 10 %) and savings of approximately 0.113 tons of CH 4 and approximately 0.78 tons of CO 2 per ton of urea produced. Thus, the results show that this waste-to-urea (WtU) technology is both economically valuable and environmentally advantageous (in terms of saving resources and limiting carbon footprint) for the production of chemicals from municipal solid waste in comparison with both the production of urea with conventional technology (starting from natural gas) and the use of RdF to produce electrical energy (waste-to-energy). A further benefit is the lower environmental impact of the solid residue produced from RdF conversion. The further benefit of this technology is the possibility to realize distributed fertilizer production. © 2017 Wiley-VCH Verlag GmbH & Co. KGaA, Weinheim.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Agazzone, U.; Ausiello, F.P.
1981-06-23
A power-generating installation comprises a plurality of modular power plants each comprised of an internal combustion engine connected to an electric machine. The electric machine is used to start the engine and thereafter operates as a generator supplying power to an electrical network common to all the modular plants. The installation has a control and protection system comprising a plurality of control modules each associated with a respective plant, and a central unit passing control signals to the modules to control starting and stopping of the individual power plants. Upon the detection of abnormal operation or failure of its associatedmore » power plant, each control module transmits an alarm signal back to the central unit which thereupon stops, or prevents the starting, of the corresponding power plant. Parameters monitored by each control module include generated current and inter-winding leakage current of the electric machine.« less
Analysis of thermal characteristics of electrical wiring for load groups in cattle barns.
Kim, Doo Hyun; Yoo, Sang-Ok; Kim, Sung Chul; Hwang, Dong Kyu
2015-01-01
The purpose of the current study is to analyze the thermal characteristics of electrical wirings depending on the number of operating load by connecting four types of electrical wirings that are selected by surveying the conditions for the electric fans, automatic waterers and halogen warm lamps that were installed in cattle barns in different years. The conditions of 64 cattle barns were surveyed and an experimental test was conducted at a cattle barn. The condition-survey covered inappropriate design, construction and misuse of electrical facility, including electrical wiring mostly used, and the mode of load current was evaluated. The survey showed that the mode of load current increased as the installation year of the fans, waterers and halogen lamps became older. Accordingly, the cattle barn manager needed to increase the capacity of the circuit breaker, which promoted the degradation of insulation of the electrical wires' sheath and increased possibility for electrical fires in the long-run. The test showed that the saturation temperature of the wire insulated sheath increased depending on the installation year of the load groups, in case of VCTFK and VFF electric wires, therefore, requiring their careful usage in the cattle barns.
Analysis of thermal characteristics of electrical wiring for load groups in cattle barns
KIM, Doo Hyun; YOO, Sang-Ok; KIM, Sung Chul; HWANG, Dong Kyu
2015-01-01
The purpose of the current study is to analyze the thermal characteristics of electrical wirings depending on the number of operating load by connecting four types of electrical wirings that are selected by surveying the conditions for the electric fans, automatic waterers and halogen warm lamps that were installed in cattle barns in different years. The conditions of 64 cattle barns were surveyed and an experimental test was conducted at a cattle barn. The condition-survey covered inappropriate design, construction and misuse of electrical facility, including electrical wiring mostly used, and the mode of load current was evaluated. The survey showed that the mode of load current increased as the installation year of the fans, waterers and halogen lamps became older. Accordingly, the cattle barn manager needed to increase the capacity of the circuit breaker, which promoted the degradation of insulation of the electrical wires’ sheath and increased possibility for electrical fires in the long-run. The test showed that the saturation temperature of the wire insulated sheath increased depending on the installation year of the load groups, in case of VCTFK and VFF electric wires, therefore, requiring their careful usage in the cattle barns. PMID:26118855
Heat-electrical regeneration way to intensive energy saving in an electric arc furnaces
NASA Astrophysics Data System (ADS)
Kartavtcev, S.; Matveev, S.; Neshporenko, E.
2018-03-01
Energy saving in steel production is of great significance for its large economical scale of 1500 mil t/year and high-energy consumption. Steady trend of last years is an increase of steel production in electric arc furnaces (EAF) with a very high consumption of electricity up to 750 kWh/ton. The intention to reduce so much energy consumption they can reach by many ways. One of such way is a transforming heat energy of liquid steel to electricity and destine it to steel electric arc process. Under certain conditions, it may lead to “zero” consumption of electric power in the process. The development of these conditions leads to the formation of energy-efficient heat schemes, with a minimum electricity consumption from the external network.
Analysis of the Environmental Impact on Remanufacturing Wind Turbines
NASA Astrophysics Data System (ADS)
Sosa Skrainka, Manuel R.
To deliver clean energy the use of wind turbines is essential. In June 2011 there was an installed wind capacity equivalent to 211,000MW world-wide (WWEA, 2011). By the end of the year 2009 the U.S. had 35,100MW of wind energy installed capacity to generate electricity (AWEA, 2010). This industry has grown in recent years and is expected to grow even more in the future. The environmental impacts that will arise from the increased number of wind turbines and their end-of-life should be addressed, as large amounts of resources will be required to satisfy the current and future market demands for wind turbines. Since future 10MW wind turbines are expected to be as heavy as 1000 tons each, the study of the environmental response of profitable retirement strategies, such as remanufacturing for these machines, must be considered. Because of the increased number of wind turbines and the materials used, this study provides a comparison between the environmental impacts from remanufacturing the components installed inside the nacelle of multi-megawatt wind turbines and wind turbines manufactured using new components. The study methodology is the following: • Describe the life-cycle and the materials and processes employed for the manufacture and remanufacturing for components inside the nacelle. • Identify remanufacturing alternatives for the components inside the nacelle at the end of the expected life-time service of wind turbines. • Evaluate the environmental impacts from the remanufactured components and compare the results with the impacts of the manufacturing of new components using SimaPro. • Conduct sensitivity analysis over the critical parameters of the life cycle assessment • Propose the most environmentally friendly options for the retirement of each major component of wind turbines. After an analysis of the scenarios the goal of the study is to evaluate remanufacturing as an end-of-life option from an environmental perspective for commercial multi-megawatt wind turbines targeted for secondary wind turbine markets.
Verification test of the Battronic Truck Volta Electric Pickup. Report for Jul 80-Jan 81
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dowgiallo, E.J. Jr; Snellings, I.R.; Chapman, R.D.
1982-04-01
The Volta Pickup is an electric 1/2-ton truck manufactured by the Battronic Truck Co. It was tested by MERADCOM at Fort Belvoir, Virginia as part of a Department of Energy project to verify conformity to performance standards of electric vehicles. The verification test results are presented in this report. The Volta Pickup is powered by 24 6-V lead-acid batteries, has a 38 hp series wound d.c. motor, SCR chopper controller, regenerative braking, and a 2-speed Helical gear transmission.
Design of a Slowed-Rotor Compound Helicopter for Future Joint Service Missions
2010-01-01
achieves a 208kt top speed at engine MCP and 11,000ft/ISA while having 216hp/ton installed power, based on engine MRP and MTOW. Figure 33...Intermediate rated power ISA International Standard Atmosphere MCP Maximum continuous power MRP Maximum rated power MTOW Maximum Takeoff Weight NDARC...NASA Design and Analysis of Rotorcraft SFC Specific fuel consumption SRC Slowed-Rotor Compound Symbols σ Rotor solidity (geometric) CD Drag
NASA Astrophysics Data System (ADS)
Yazdani, R.; Kieffer, J.; Akau, H.; Augenstein, D.
2002-12-01
Sanitary landfilling is the dominant method of solid waste disposal in the United States, accounting for about 217 million tons of waste annually (U.S. EPA, 1997) and has more than doubled since 1960. In spite of increasing rates of reuse and recycling, population and economic growth will continue to render landfilling as an important and necessary component of solid waste management. Yolo County Department of Planning and Public Works, Division of Integrated Waste Management is demonstrating a new landfill technology called Bioreactor Landfill to better manage solid waste. In a Bioreactor Landfill, controlled quantities of liquid (leachate, groundwater, gray-water, etc.) are added and recirculated to increase the moisture content of the waste and improve waste decomposition. As demonstrated in a small-scale demonstration project at the Yolo County Central Landfill in 1995, this process significantly increases the biodegradation rate of waste and thus decreases the waste stabilization and composting time (5 to 10 years) relative to what would occur within a conventional landfill (30 to 50 years or more). When waste decomposes anaerobically (in absence of oxygen), it produces landfill gas (biogas). Biogas is primarily a mixture of methane, a potent greenhouse gas, carbon dioxide, and small amounts of Volatile Organic Compounds (VOC's) which can be recovered for electricity or other uses. Other benefits of a bioreactor landfill composting operation include increased landfill waste settlement which increases in landfill capacity and life, improved leachate chemistry, possible reduction of landfill post-closure management time, opportunity to explore decomposed waste for landfill mining, and abatement of greenhouse gases through highly efficient methane capture over a much shorter period of time than is typical of waste management through conventional landfilling. This project also investigates the aerobic decomposition of waste of 13,000 tons of waste (2.5 acre) for elimination of methane production and acceleration of waste decomposition. In the first phase of this project a 12-acre module that contains a 9.5-acre anaerobic cell and a 2.5-acre aerobic cell has been constructed and filled with over 220,000 tons of municipal solid waste. Water and leachate addition began in April 2002 and to date less than 200,000 gallons of liquid has been added to the 3.5-acre anaerobic cell. The waste filling phase of the aerobic cell was completed in June of 2002 and a 12-inches soil cover and 12-inches of greenwaste compost cover was placed on top of the cell. A vacuum will be applied to the piping within the waste to draw air through the landfill. Instrumentations have been installed to monitor the following parameters: waste temperature, moisture, leachate volumes, leachate hydraulic head over the primary liner, leachate composition, gas volumes and composition. A supervisory Control and Data Acquisition (SCADA) system has been installed to monitor and control the operation of the bioreactor cells. Waste samples were taken from each cell for laboratory testing in early June 2002.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1977-01-01
The legislation on greater coal utilization before the committee includes S. 272 (requiring, to the extent practicable, electric power plants and major fuel-bearing installations to utilize fuels other than natural gas); S. 273 (requiring, to the extent practicable, new electric power plants and new major fuel-burning installations be constructed to utliize fuels other than natural gas or petroleum); and S. 977 (requiring, to the extent practicable, existing electric power plants and major fuel-burning installations to utilize fuels other than natural gas or petroleum). Statements were heard from seven senators and representatives from the following: American Electric Power Service Corp., Americanmore » Boiler Manufactures Association, National Electric Reliability Council, Virgina Electric and Power Co., Fossil Power Systems, Houston Lighting and Power Co., other electric utility industry representatives, and the Federal Energy Adminstration. Additional material from the Wall Street Journal and the Washington Post is included. (MCW)« less
Seismic Analysis of Three Bomb Explosions in Turkey
NASA Astrophysics Data System (ADS)
Necmioglu, O.; Semin, K. U.; Kocak, S.; Destici, C.; Teoman, U.; Ozel, N. M.
2016-12-01
Seismic analysis of three vehicle-installed bomb explosions occurred on 13 March 2016 in Ankara, 12 May 2016 in Diyarbakır and 9 July 2016 in Mardin have been conducted using data from the nearest stations (LOD, DYBB and MAZI) of the Boğaziçi University - Kandilli Observatory and Earthquake Research Institute's (KOERI) seismic network and compared with low-magnitude earthquakes in similar distance based on phase readings and frequency content. Amplitude spectra has been compared through Fourier transformation and earthquake-explosion frequency discrimination has been performed using various filter bands. Time-domain and spectral analysis have been performed using Geotool software provided by CTBTO. Local magnitude (ML) values have been calculated for each explosion by removing instrument-response and adding Wood-Anderson type instrument response. Approximate amount of explosives used in these explosions have been determined using empirical methods of Koper (2002). Preliminary results indicated that 16 tons TNT equivalent explosives have been used in 12 May 2016 Diyarbakır explosion, which is very much in accordance with the media reports claiming 15 tons of TNT. Our analysis for 9 July 2016 Mardin explosion matched the reported 5 tons of explosives. Results concerning 13 March 2016 Ankara explosion indicated that approximately 1,7 ton of TNT equivalent explosives were used in the attack whereas security and intelligence reports claimed 300 kg explosives as a combination of TNT, RDX and ammonium nitrate. The overestimated results obtained in our analysis for the Ankara explosion may be related due to i) high relative effectiveness factor of the RDX component of the explosive ii) inefficiency of Koper (2002) method in lower yields (since the method was developed using explosions with yields of 3-12 tons of TNT), iii) combination of both.
40 CFR 51.308 - Regional haze program requirements.
Code of Federal Regulations, 2014 CFR
2014-07-01
... for fossil-fuel fired power plants having a total generating capacity greater than 750 megawatts must...-eligible fossil fuel-fired steam electric plants in the State to install, operate, and maintain BART for... fossil fuel-fired steam electric plants in the State to install, operate, and maintain BART for the...
40 CFR 51.308 - Regional haze program requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
... for fossil-fuel fired power plants having a total generating capacity greater than 750 megawatts must...-eligible fossil fuel-fired steam electric plants in the State to install, operate, and maintain BART for... fossil fuel-fired steam electric plants in the State to install, operate, and maintain BART for the...
Power game needs risk-free approach.
Baillie, Jonathan
2011-05-01
A detailed look at the latest regulations, legislation, and guidance governing electrical services and installations in healthcare was given by Richard Knight, director of professional estates and facilities business consultancy, CPA Solutions, at a recent IHEEM seminar, "Electrical installation guidance for healthcare premises", in London. HEJ editor Jonathan Baillie reports.
77 FR 47273 - Airworthiness Directives; Airbus Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-08
... the autopilot electrical wiring conduit and the wing bottom skin. This AD requires modifying the wiring installation on the right-hand wing. We are issuing this AD to prevent sparking due to electrical... above, this [EASA] AD requires modification of the wiring installation to improve the routing and the...
30 CFR 77.511 - Danger signs at electrical installations.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Danger signs at electrical installations. 77.511 Section 77.511 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF...
DOD fuel cell demonstration program
DOE Office of Scientific and Technical Information (OSTI.GOV)
Holcomb, F.H.; Binder, M.J.; Taylor, W.R.
The supply of reliable, cost-effective electric power with minimal environmental impact is a constant concern of Department of Defense (DOD) installation energy personnel. Electricity purchased from the local utility is expensive and represents only about 30% of the original energy input at the generating station due to generation and distribution inefficiencies. Because of master metering and large air conditioning loads, the demand portion of the installation`s electric bill can be in excess of 50% of the total bill. While the electric utilities in the United States have a very good record of reliability, there is significant potential for improving themore » security of electrical power supplied by using on-site power generation. On-site, dispersed power generation can reduce power outages due to weather, terrorist activities, or lack of utility generating capacity. In addition, as increased emphasis is placed on global warming, acid rain, and air pollution in general, the development of clean, highly efficient power producing technologies is not only desirable, but mandatory. Since the majority of central heat plants on U.S. military installations are nearing the end of their useful life, there is an opportunity to replace outdated existing equipment with modem technologies.« less
Code of Federal Regulations, 2010 CFR
2010-07-01
... or no such training) working on, near, or with the following installations: (1) Premises wiring. Installations of electric conductors and equipment within or on buildings or other structures, and on other... wiring. Installations of other outside conductors on the premises. (4) Optical fiber cable. Installations...
1999-11-30
These five STS-97 crew members posed for a traditional portrait during training. On the front row, left to right, are astronauts Michael J. Bloomfield, pilot; Marc Garneau, mission specialist representing the Canadian Space Agency (CSA); and Brent W. Jett, Jr., commander. In the rear, wearing training versions of the extravehicular mobility unit (EMU) space suits, (left to right) are astronauts Carlos I. Noriega, and Joseph R. Tarner, both mission specialists. The primary objective of the STS-97 mission was the delivery, assembly, and activation of the U.S. electrical power system onboard the International Space Station (ISS). The electrical power system, which is built into a 73-meter (240-foot) long solar array structure consists of solar arrays, radiators, batteries, and electronics. The entire 15.4-metric ton (17-ton) package is called the P6 Integrated Truss Segment and is the heaviest and largest element yet delivered to the station aboard a space shuttle. The electrical system will eventually provide the power necessary for the first ISS crews to live and work in the U.S. segment. The STS-97 crew of five launched aboard the Space Shuttle Orbiter Endeavor on November 30, 2000 for an 11 day mission.
C. G. Doris participation in the development of Abu-Al-Bu Koosh Field (in English and French)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
On behalf of the total-ABK group, the company, C.G. Doris, has taken an active part in the development of the gas-lift and water injection installations in the Abu-Al-Bu Koosh Fields. The gas lift platform is a 4-legged jacket in 30 m of water with 2 deck levels. It is joined by a bridge to the production platform. Total load of the new platform is 1000 tons of steel plus 200 tons of piles. The 2 water injection tripods in 41 and 27 m of water also are pile-supported jackets with the vertical and 2 inclined legs. Also, the 2 workovermore » platforms have been thoroughly rechecked by C.G. Doris. Furthermore, a living quarters platform was designed and contracted by the company on a turn-key basis. Capacity is 60 people, with a possibility of expansion.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Adams, D.L.; et al.
The 35-ton prototype for the Deep Underground Neutrino Experiment far detector was a single-phase liquid argon time projection chamber with an integrated photon detector system, all situated inside a membrane cryostat. The detector took cosmic-ray data for six weeks during the period of February 1, 2016 to March 12, 2016. The performance of the photon detection system was checked with these data. An installed photon detector was demonstrated to measure the arrival times of cosmic-ray muons with a resolution better than 32 ns, limited by the timing of the trigger system. A measurement of the timing resolution using closely-spaced calibration pulses yielded a resolution of 15 ns for pulses at a level of 6 photo-electrons. Scintillation light from cosmic-ray muons was observed to be attenuated with increasing distance with a characteristic length ofmore » $$155 \\pm 28$$ cm.« less
14 CFR 25.1703 - Function and installation: EWIS.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Function and installation: EWIS. 25.1703... AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Electrical Wiring Interconnection Systems (EWIS) § 25.1703 Function and installation: EWIS. (a) Each EWIS component installed in any area of the...
Installation and Assembly, Electrical Ground Support Equipment (GSE), Specification for
NASA Technical Reports Server (NTRS)
Denson, Erik C.
2014-01-01
This specification covers the general workmanship requirements and procedures for the complete installation and assembly of electrical ground support equipment (EGSE) such as terminal distributors, junction boxes, conduit and fittings, cable trays and accessories, interconnecting cables (including routing requirements), motor-control equipment, and necessary hardware as specified by the applicable contract and drawings.
46 CFR 111.05-3 - Design, construction, and installation; general.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Design, construction, and installation; general. 111.05-3 Section 111.05-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Equipment Ground, Ground Detection, and Grounded Systems § 111.05-3 Design, construction, and...
46 CFR 111.05-3 - Design, construction, and installation; general.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Design, construction, and installation; general. 111.05-3 Section 111.05-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Equipment Ground, Ground Detection, and Grounded Systems § 111.05-3 Design, construction, and...
30 CFR 250.114 - How must I install and operate electrical equipment?
Code of Federal Regulations, 2011 CFR
2011-07-01
... structures, and their facilities. (a) You must classify all areas according to API RP 500, Recommended... Class I, Division 1 and Division 2, or API RP 505, Recommended Practice for Classification of Locations... according to API RP 14F, Recommended Practice for Design and Installation of Electrical Systems for Fixed...
Coyula, Miguel
2016-07-01
The abrupt breakup of the USSR and socialist bloc in the early 1990s dealt a devastating blow to the island's economy. Almost overnight, beneficial aid and trade provided by the Council for Mutual Economic Assistance ground to a halt, including 80% of foreign trade previously conducted as barter and sales of 13 million tons of oil per year at preferential prices. When the Cuban economy bottomed out in 1993, oil imports had dropped from 13 to 4 million tons annually. At the time, Cuba depended almost entirely on imported oil and the dramatic decline in imports created massive blackouts, leaving most Cuban homes without electricity 12 hours a day.
Feasibility study: Liquid hydrogen plant, 30 tons per day
NASA Technical Reports Server (NTRS)
1975-01-01
The design considerations of the plant are discussed in detail along with management planning, objective schedules, and cost estimates. The processing scheme is aimed at ultimate use of coal as the basic raw material. For back-up, and to provide assurance of a dependable and steady supply of hydrogen, a parallel and redundant facility for gasifying heavy residual oil will be installed. Both the coal and residual oil gasifiers will use the partial oxidation process.
Photocopy of plan (in collection of U.S. Coast Guard Civil ...
Photocopy of plan (in collection of U.S. Coast Guard Civil Engineering Unit Providence, Warwick, RI), U.S. Coast Guard Civil Engineering, third district, Sandy Hook L/B Station, Sandy Hook N.J., buoy hoist installation and bldg alterations, January 3, 1952 Details of 4 ton hoist and building, wharf B - U.S. Coast Guard Sandy Hook Station, Western Docking Structure, West of intersection of Canfield Road & Hartshorne Drive, Highlands, Monmouth County, NJ
1979-02-01
I ser light source, a 250 x 500-mm. X-Y input table, optics, and a 500 x 1,000-mm, output drum mounted on a 3-ton granite base. As the input...computer via the teletype. The printer unit is installed in a clean-room environment, part of which is a darkroom containing-E the output drum . Since... drum -type. UNAMACE elevation data will that are repetitive, tedious, and very demanding with respect to be converted to contour line format by
Measured Performance of a Low Temperature Air Source Heat Pump
DOE Office of Scientific and Technical Information (OSTI.GOV)
R.K. Johnson
2013-09-01
A 4-ton Low Temperature Heat Pump (LTHP) manufactured by Hallowell International was installed in a residence near New Haven, Connecticut and monitored over two winters of operation. After attending to some significant service issues, the heat pump operated as designed. This report should be considered a review of the dual compressor “boosted heat pump” technology. The Low Temperature Heat Pump system operates with four increasing levels of capacity (heat output) as the outdoor temperature drops.
Report #2005-P-00003, February 3, 2005. Evidence indicates that EPA senior management instructed EPA staff to develop a Maximum Achievable Control Technology (MACT) standard for mercury that would result in national emissions of 34 tons annually.
30 CFR 57.12050 - Installation of trolley wires.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Installation of trolley wires. 57.12050 Section 57.12050 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND... Electricity Surface and Underground § 57.12050 Installation of trolley wires. Trolley wires shall be installed...
30 CFR 57.12050 - Installation of trolley wires.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Installation of trolley wires. 57.12050 Section 57.12050 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND... Electricity Surface and Underground § 57.12050 Installation of trolley wires. Trolley wires shall be installed...
30 CFR 57.12067 - Installation of transformers.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Installation of transformers. 57.12067 Section... Electricity Surface Only § 57.12067 Installation of transformers. Transformers shall be totally enclosed, or shall be placed at least 8 feet above the ground, or installed in a transformer house, or surrounded by...
30 CFR 57.12067 - Installation of transformers.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Installation of transformers. 57.12067 Section... Electricity Surface Only § 57.12067 Installation of transformers. Transformers shall be totally enclosed, or shall be placed at least 8 feet above the ground, or installed in a transformer house, or surrounded by...
30 CFR 57.12067 - Installation of transformers.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Installation of transformers. 57.12067 Section... Electricity Surface Only § 57.12067 Installation of transformers. Transformers shall be totally enclosed, or shall be placed at least 8 feet above the ground, or installed in a transformer house, or surrounded by...
30 CFR 57.12067 - Installation of transformers.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Installation of transformers. 57.12067 Section... Electricity Surface Only § 57.12067 Installation of transformers. Transformers shall be totally enclosed, or shall be placed at least 8 feet above the ground, or installed in a transformer house, or surrounded by...
30 CFR 57.12067 - Installation of transformers.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Installation of transformers. 57.12067 Section... Electricity Surface Only § 57.12067 Installation of transformers. Transformers shall be totally enclosed, or shall be placed at least 8 feet above the ground, or installed in a transformer house, or surrounded by...
Electricity Submetering on the Cheap: Stick-on Electricity Meters
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lanzisera, Steven; Lorek, Michael; Pister, Kristofer
2014-08-17
We demonstrate a low-cost, 21 x 12 mm prototype Stick-on Electricity Meter (SEM) to replace traditional in-circuit-breaker-panel current and voltage sensors for building submetering. A SEM sensor is installed on the external face of a circuit breaker to generate voltage and current signals. This allows for the computation of real and apparent power as well as capturing harmonics created by non-linear loads. The prototype sensor is built using commercially available components, resulting in a production cost of under $10 per SEM. With no highvoltage install work requiring an electrician, home owners or other individuals can install the system in amore » few minutes with no safety implications. This leads to an installed system cost that is much lower than traditional submetering technology.. Measurement results from lab characterization as well as a real-world residential dwelling installation are presented, verifying the operation of our proposed SEM sensor. The SEM sensor can resolve breaker power levels below 10W, and it can be used to provide data for non-intrusive load monitoring systems at full sample rate.« less
49 CFR 236.308 - Mechanical or electric locking or electric circuits; requisites.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 4 2010-10-01 2010-10-01 false Mechanical or electric locking or electric..., AND APPLIANCES Interlocking Standards § 236.308 Mechanical or electric locking or electric circuits; requisites. Mechanical or electric locking or electric circuits shall be installed to prevent signals from...
Israel Electric joins oil shale power plant project
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1986-12-01
The Israel Electric Corporation has purchased a 25% share in PAMA (Energy Resources Development, Ltd). PAMA is planning to build a 7 1/2 megawatt shale-fired demonstration plant at Mishor Rotem in Israel. The demonstration cogeneration plant is being designed to produce 42 tons/hours of steam for use in nearby phosphate plants, and also produce electricity. Construction of the demonstration plant is expected to begin in early 1987 and be completed within 2 years. It will be based on fluidized bed technology. Successful operation of the demo plant could then lead to a 50 to 100 megawatt or larger commercial plant.
46 CFR 31.35-1 - Electrical installations, lighting and power equipment, batteries, etc.-TB/ALL.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 1 2010-10-01 2010-10-01 false Electrical installations, lighting and power equipment, batteries, etc.-TB/ALL. 31.35-1 Section 31.35-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK... and power equipment, batteries, etc.—TB/ALL. All tank vessels are subject to the regulations contained...
Installation package maxi-therm S-101 heating module
NASA Technical Reports Server (NTRS)
1977-01-01
The installation, operation and maintenance of the Maxi-Therm S-101 Thermosypnon Heating Module is described. The Maxi-Therm S-101 is a packaged unit, complete with air filter, blower, electrical controls, and a thermosyphon liquid to air heat exchanger. It is intended for use in residential solar heating systems and can utilize off-peak electrical power.
Solar Water Heater Installation Package
NASA Technical Reports Server (NTRS)
1982-01-01
A 48-page report describes water-heating system, installation (covering collector orientation, mounting, plumbing and wiring), operating instructions and maintenance procedures. Commercial solar-powered water heater system consists of a solar collector, solar-heated-water tank, electrically heated water tank and controls. Analysis of possible hazards from pressure, electricity, toxicity, flammability, gas, hot water and steam are also included.
ERIC Educational Resources Information Center
Eze, Ogwa Christopher
2015-01-01
This research was conducted to ascertain teachers' and students perception of instructional supervision in relation to capacity building in electrical installation trade in technical colleges. Three research questions and a null hypothesis were employed to guide the study. Descriptive survey was adopted. A 23-item questionnaire was used to elicit…
46 CFR 31.35-1 - Electrical installations, lighting and power equipment, batteries, etc.-TB/ALL.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 1 2011-10-01 2011-10-01 false Electrical installations, lighting and power equipment, batteries, etc.-TB/ALL. 31.35-1 Section 31.35-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK... and power equipment, batteries, etc.—TB/ALL. All tank vessels are subject to the regulations contained...
46 CFR 31.35-1 - Electrical installations, lighting and power equipment, batteries, etc.-TB/ALL.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 1 2012-10-01 2012-10-01 false Electrical installations, lighting and power equipment, batteries, etc.-TB/ALL. 31.35-1 Section 31.35-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK... and power equipment, batteries, etc.—TB/ALL. All tank vessels are subject to the regulations contained...
46 CFR 31.35-1 - Electrical installations, lighting and power equipment, batteries, etc.-TB/ALL.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 1 2014-10-01 2014-10-01 false Electrical installations, lighting and power equipment, batteries, etc.-TB/ALL. 31.35-1 Section 31.35-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK... and power equipment, batteries, etc.—TB/ALL. All tank vessels are subject to the regulations contained...
46 CFR 31.35-1 - Electrical installations, lighting and power equipment, batteries, etc.-TB/ALL.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 1 2013-10-01 2013-10-01 false Electrical installations, lighting and power equipment, batteries, etc.-TB/ALL. 31.35-1 Section 31.35-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK... and power equipment, batteries, etc.—TB/ALL. All tank vessels are subject to the regulations contained...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mønster, Jacob; Samuelsson, Jerker, E-mail: jerker.samuelsson@fluxsense.se; Kjeldsen, Peter
2015-01-15
Highlights: • Quantification of whole landfill site methane emission at 15 landfills. • Multiple on-site source identification and quantification. • Quantified methane emission from shredder waste and composting. • Large difference between measured and reported methane emissions. - Abstract: Whole-site methane emissions from 15 Danish landfills were assessed using a mobile tracer dispersion method with either Fourier transform infrared spectroscopy (FTIR), using nitrous oxide as a tracer gas, or cavity ring-down spectrometry (CRDS), using acetylene as a tracer gas. The landfills were chosen to represent the different stages of the lifetime of a landfill, including open, active, and closed coveredmore » landfills, as well as those with and without gas extraction for utilisation or flaring. Measurements also included landfills with biocover for oxidizing any fugitive methane. Methane emission rates ranged from 2.6 to 60.8 kg h{sup −1}, corresponding to 0.7–13.2 g m{sup −2} d{sup −1}, with the largest emission rates per area coming from landfills with malfunctioning gas extraction systems installed, and the smallest emission rates from landfills closed decades ago and landfills with an engineered biocover installed. Landfills with gas collection and recovery systems had a recovery efficiency of 41–81%. Landfills where shredder waste was deposited showed significant methane emissions, with the largest emission from newly deposited shredder waste. The average methane emission from the landfills was 154 tons y{sup −1}. This average was obtained from a few measurement campaigns conducted at each of the 15 landfills and extrapolating to annual emissions requires more measurements. Assuming that these landfills are representative of the average Danish landfill, the total emission from Danish landfills were calculated at 20,600 tons y{sup −1}, which is significantly lower than the 33,300 tons y{sup −1} estimated for the national greenhouse gas inventory for 2011.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Troy, M.
1982-11-01
Results of the workshop show that a eucalyptus tree plantation, including a small nursery to produce the seedlings not available from the Waimea State Tree Nursery, could be established on 12,000 acres of Puna Sugar Company land. At approximately six years of age, the trees could be harvested, chipped, and burned in the renovated Puna Sugar Company's bagasse boiler to generate electricity. The cost of a bone dry ton of chips would be $37 if a real money rate of 3% is assumed, and $50 at a real money rate of 8%. Electricity could be produced at 7.7 cents permore » kWh assuming a 3% real money rate, and at 9.8 cents per kWh at an 8% rate. This workshop included an evaluation of soils at the selected Keeau site. Tree crop requirements were matched with soil and other environmental characteristics such as rainfall, altitude, and temperature. Leucaena Leucocephala, L. diversifolia, Eucalyptus saligna, E. grandis, and E. robusta were among the primary species considered, and based upon known environmental requirements and previous experience, E. grandis was selected. A conservative yield estimate for E. grandis at the specified site is 10 bone dry tons (20 green tons)/acre/year of total biomass. The 12,000 acre area would be planted continuously over period of six years at an annual production rate of 2000 acres per year. Spacing would be 6x6, or 1210 trees per acre, which, including a 10% seedling discard rate, would bring the total number of seedlings required to 2.7 million/year. Harvesting operations would begin in the 7th year, and three coppice crops would be harvested before replanting became necessary again. For the production of 120,000 bone dry tons (240,000 green tons) per year, four separate harvesting systems would be needed. Each would consist of 1 mobile whole tree chipper, 2 tracked feller-bunchers, 3 rubber-tired and tracked grapple skidders, 2 truck trailers, 3 chip vans, and 1 D-4 dozer. 10 figures, 31 tables.« less
Code of Federal Regulations, 2013 CFR
2013-07-01
... wiring. Installations of other outside conductors on the premises. (4) Optical fiber cable. Installations of optical fiber cable where such installations are made along with electric conductors. Note: See... of utilization equipment used for purposes other than generating, transmitting, or distributing...
Code of Federal Regulations, 2014 CFR
2014-07-01
... wiring. Installations of other outside conductors on the premises. (4) Optical fiber cable. Installations of optical fiber cable where such installations are made along with electric conductors. Note: See... of utilization equipment used for purposes other than generating, transmitting, or distributing...
2011-03-15
Lone Eagle Street Columbus Ohio 43228 Installation trades personnel 5/7/2009 12:00:00AM 10/31/2010 12:00:00AM Sub Contractor Numbers (c): Patent...43026-2573 Pipe fitter installation trades personnel. 10/21/2009 12:00:00AM 1/31/2011 12:00:00AM Sub Contractor Numbers (c): Patent Clause Number...City Electric Company 1099 Sullivant Avenue Columbus Ohio 43223 Electrical installation trades personnel 4/5/2009 12:00:00AM 9/30/2010 12:00:00AM
46 CFR 113.43-1 - Applicability.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Applicability. 113.43-1 Section 113.43-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING COMMUNICATION AND ALARM... each vessel of 1600 gross tons and over that has power driven main or auxiliary steering gear. ...
46 CFR 113.43-1 - Applicability.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Applicability. 113.43-1 Section 113.43-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING COMMUNICATION AND ALARM... each vessel of 1600 gross tons and over that has power driven main or auxiliary steering gear. ...
46 CFR 113.43-1 - Applicability.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Applicability. 113.43-1 Section 113.43-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING COMMUNICATION AND ALARM... each vessel of 1600 gross tons and over that has power driven main or auxiliary steering gear. ...
46 CFR 113.43-1 - Applicability.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Applicability. 113.43-1 Section 113.43-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING COMMUNICATION AND ALARM... each vessel of 1600 gross tons and over that has power driven main or auxiliary steering gear. ...
46 CFR 113.43-1 - Applicability.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Applicability. 113.43-1 Section 113.43-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING COMMUNICATION AND ALARM... each vessel of 1600 gross tons and over that has power driven main or auxiliary steering gear. ...
Influence of Chlorine Emissions on Ozone Levels in the Troposphere
Chlorine emissions from cooling towers are emitted mainly as hypochlous acid, not as molecular chlorine. Chlorine emissions from cooling towers in electric utilities in the U.S. are estimated to be 4,400 tons per year. Molecular chlorine increases more tropospheric ozone than hyp...
1962-01-01
This artist's concept from 1962 show a three hundred-sixty ton spaceship, powered by a forty-megawatt nuclear-electric power plant, transporting a three-man crew to Mars. As envisioned by Marshall Space Flight Center engineers, a five-ship convoy would make the round trip journey in about five hundred days.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Electrical Accident Occupation Blue collar supervisors. 1 Electrical and electronic engineers. 1 Electrical... OCCUPATIONAL SAFETY AND HEALTH STANDARDS Electrical Safety-Related Work Practices § 1910.332 Training. (a... electric shock that is not reduced to a safe level by the electrical installation requirements of §§ 1910...
Code of Federal Regulations, 2011 CFR
2011-07-01
... Electrical Accident Occupation Blue collar supervisors. 1 Electrical and electronic engineers. 1 Electrical... OCCUPATIONAL SAFETY AND HEALTH STANDARDS Electrical Safety-Related Work Practices § 1910.332 Training. (a... electric shock that is not reduced to a safe level by the electrical installation requirements of §§ 1910...
Code of Federal Regulations, 2013 CFR
2013-07-01
... Electrical Accident Occupation Blue collar supervisors. 1 Electrical and electronic engineers. 1 Electrical... OCCUPATIONAL SAFETY AND HEALTH STANDARDS Electrical Safety-Related Work Practices § 1910.332 Training. (a... electric shock that is not reduced to a safe level by the electrical installation requirements of §§ 1910...
Code of Federal Regulations, 2012 CFR
2012-07-01
... Electrical Accident Occupation Blue collar supervisors. 1 Electrical and electronic engineers. 1 Electrical... OCCUPATIONAL SAFETY AND HEALTH STANDARDS Electrical Safety-Related Work Practices § 1910.332 Training. (a... electric shock that is not reduced to a safe level by the electrical installation requirements of §§ 1910...
Code of Federal Regulations, 2014 CFR
2014-07-01
... Electrical Accident Occupation Blue collar supervisors. 1 Electrical and electronic engineers. 1 Electrical... OCCUPATIONAL SAFETY AND HEALTH STANDARDS Electrical Safety-Related Work Practices § 1910.332 Training. (a... electric shock that is not reduced to a safe level by the electrical installation requirements of §§ 1910...
Final Report: Assessment of Combined Heat and Power Premium Power Applications in California
DOE Office of Scientific and Technical Information (OSTI.GOV)
Norwood, Zack; Lipman, Tim; Marnay, Chris
2008-09-30
This report analyzes the current economic and environmental performance of combined heat and power (CHP) systems in power interruption intolerant commercial facilities. Through a series of three case studies, key trade-offs are analyzed with regard to the provision of black-out ridethrough capability with the CHP systems and the resutling ability to avoid the need for at least some diesel backup generator capacity located at the case study sites. Each of the selected sites currently have a CHP or combined heating, cooling, and power (CCHP) system in addition to diesel backup generators. In all cases the CHP/CCHP system have a smallmore » fraction of the electrical capacity of the diesel generators. Although none of the selected sites currently have the ability to run the CHP systems as emergency backup power, all could be retrofitted to provide this blackout ride-through capability, and new CHP systems can be installed with this capability. The following three sites/systems were used for this analysis: (1) Sierra Nevada Brewery - Using 1MW of installed Molten Carbonate Fuel Cells operating on a combination of digestor gas (from the beer brewing process) and natural gas, this facility can produce electricty and heat for the brewery and attached bottling plant. The major thermal load on-site is to keep the brewing tanks at appropriate temperatures. (2) NetApp Data Center - Using 1.125 MW of Hess Microgen natural gas fired reciprocating engine-generators, with exhaust gas and jacket water heat recovery attached to over 300 tons of of adsorption chillers, this combined cooling and power system provides electricity and cooling to a data center with a 1,200 kW peak electrical load. (3) Kaiser Permanente Hayward Hospital - With 180kW of Tecogen natural gas fired reciprocating engine-generators this CHP system generates steam for space heating, and hot water for a city hospital. For all sites, similar assumptions are made about the economic and technological constraints of the power generation system. Using the Distributed Energy Resource Customer Adoption Model (DER-CAM) developed at the Lawrence Berkeley National Laboratory, we model three representative scenarios and find the optimal operation scheduling, yearly energy cost, and energy technology investments for each scenario below: Scenario 1 - Diesel generators and CHP/CCHP equipment as installed in the current facility. Scenario 1 represents a baseline forced investment in currently installed energy equipment. Scenario 2 - Existing CHP equipment installed with blackout ride-through capability to replace approximately the same capacity of diesel generators. In Scenario 2 the cost of the replaced diesel units is saved, however additional capital cost for the controls and switchgear for blackout ride-through capability is necessary. Scenario 3 - Fully optimized site analysis, allowing DER-CAM to specify the number of diesel and CHP/CCHP units (with blackout ride-through capability) that should be installed ignoring any constraints on backup generation. Scenario 3 allows DER-CAM to optimize scheduling and number of generation units from the currently available technologies at a particular site. The results of this analysis, using real data to model the optimal schedulding of hypothetical and actual CHP systems for a brewery, data center, and hospital, lead to some interesting conclusions. First, facilities with high heating loads will typically prove to be the most appropriate for CHP installation from a purely economic standpoint. Second, absorption/adsorption cooling systems may only be economically feasible if the technology for these chillers can increase above current best system efficiency. At a coefficient of performance (COP) of 0.8, for instance, an adsorption chiller paired with a natural gas generator with waste heat recovery at a facility with large cooling loads, like a data center, will cost no less on a yearly basis than purchasing electricity and natural gas directly from a utility. Third, at marginal additional cost, if the reliability of CHP systems proves to be at least as high as diesel generators (which we expect to be the case), the CHP system could replace the diesel generator at little or no additional cost. This is true if the thermal to electric (relative) load of those facilities was already high enough to economically justify a CHP system. Last, in terms of greenhouse gas emissions, the modeled CHP and CCHP systems provide some degree of decreased emissions relative to systems with less CHP installed. The emission reduction can be up to 10% in the optimized case (Scenario 3) in the application with the highest relative thermal load, in this case the hospital. Although these results should be qualified because they are only based on the three case studies, the general results and lessons learned are expected to be applicable across a broad range of potential and existing CCHP systems.« less
REACH. Electricity Units, Post-Secondary.
ERIC Educational Resources Information Center
Smith, Gene; And Others
As a part of the REACH (Refrigeration, Electro-Mechanical, Air-Conditioning, Heating) electromechanical cluster, this postsecondary student manual contains individualized instructional units in the area of electricity. The instructional units focus on electricity fundamentals, electric motors, electrical components, and controls and installation.…
46 CFR 111.95-1 - Applicability.
Code of Federal Regulations, 2012 CFR
2012-10-01
... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-1 Applicability. (a) The electric installation of each electric power-operated boat winch must meet the requirements in this subpart, except that limit...
46 CFR 111.95-1 - Applicability.
Code of Federal Regulations, 2014 CFR
2014-10-01
... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-1 Applicability. (a) The electric installation of each electric power-operated boat winch must meet the requirements in this subpart, except that limit...
46 CFR 111.95-1 - Applicability.
Code of Federal Regulations, 2013 CFR
2013-10-01
... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-1 Applicability. (a) The electric installation of each electric power-operated boat winch must meet the requirements in this subpart, except that limit...
46 CFR 111.95-1 - Applicability.
Code of Federal Regulations, 2011 CFR
2011-10-01
... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-1 Applicability. (a) The electric installation of each electric power-operated boat winch must meet the requirements in this subpart, except that limit...
46 CFR 111.95-1 - Applicability.
Code of Federal Regulations, 2010 CFR
2010-10-01
... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-1 Applicability. (a) The electric installation of each electric power-operated boat winch must meet the requirements in this subpart, except that limit...
New Manufacturing Method for Paper Filler and Fiber Material
DOE Office of Scientific and Technical Information (OSTI.GOV)
Doelle, Klaus
2013-08-25
The use of fillers in printing and writing papers has become a prerequisite for competing in a global market to reduce the cost of materials. Use of calcium carbonates (ranging from 18% to 30%) as filler is a common practice in the paper industry but the choices of fillers for each type of papers vary widely according to its use. The market for uncoated digital printing paper is one that continues to introduce exciting growth projections. and it is important to understand the effect that new manufacturing methods of calcium carbonates have on the energy efficiency and paper production. Research conducted under this award showed that the new fiber filler composite material has the potential to increase the paper filler content by up to 5% without losing mechanical properties. Benefits of the technology can be summarized as follows for a 1% filler increase per metric ton of paper produced: (i) production cost savings overmore » $$12, (ii) Energy savings of 100,900 btu, (iii) CO{sub 2} emission savings of 33 lbs, and additional savings for wood preparation, pulping, recovery of 203593 btu with a 46lbs of CO{sub 2} emission savings per 1% filler increase. In addition the technology has the potential to save: (i) additional $$3 per ton of bleached pulp produced, (ii) bleaching energy savings of 170,000 btu, (iii) bleaching CO{sub 2} emission savings of 39 lbs, and (iv) additional savings for replacing conventional bleaching chemicals with a sustainable bleaching chemical is estimated to be 900,000 btu with a 205 lbs of CO{sub 2} emission savings per ton of bleached pulp produced. All the above translates to a estimated annual savings for a 12% filler increase of 296 trillion buts or 51 million barrel of oil equivalent (BOE) or 13.7% of the industries energy demand. This can lead to a increase of renewable energy usage from 56% to close to 70% for the industry sector. CO{sub 2} emission of the industry at a 12% filler increase could be lowered by over 39 million tons annually. If the new technology could be implemented for bleaching process a total annual estimated energy savings potential of 64 trillion buts or 11 million barrel of oil equivalent (BOE) equal to 3% of the paper industries energy demand could be realized. This could lead to a increase of renewable energy usage from 56% to close to 60% for the industry. CO{sub 2} emissions could be lowered by over 7.4 million tons annually. It is estimated that an installed system could also yield a 75 to 100% return of investment (ROI) rate for the capital equipment that need to be installed for the fiber filler composite manufacturing process.« less
46 CFR 119.220 - Installations.
Code of Federal Regulations, 2013 CFR
2013-10-01
... PASSENGERS OR WITH OVERNIGHT ACCOMMODATIONS FOR MORE THAN 49 PASSENGERS MACHINERY INSTALLATION Propulsion... subchapter J (Electrical Engineering) of this chapter. (b) Installation of propulsion machinery of an unusual... requirements as determined necessary by the cognizant OCMI. Unusual types of propulsion machinery include: (1...
46 CFR 119.220 - Installations.
Code of Federal Regulations, 2012 CFR
2012-10-01
... PASSENGERS OR WITH OVERNIGHT ACCOMMODATIONS FOR MORE THAN 49 PASSENGERS MACHINERY INSTALLATION Propulsion... subchapter J (Electrical Engineering) of this chapter. (b) Installation of propulsion machinery of an unusual... requirements as determined necessary by the cognizant OCMI. Unusual types of propulsion machinery include: (1...
46 CFR 119.220 - Installations.
Code of Federal Regulations, 2011 CFR
2011-10-01
... PASSENGERS OR WITH OVERNIGHT ACCOMMODATIONS FOR MORE THAN 49 PASSENGERS MACHINERY INSTALLATION Propulsion... subchapter J (Electrical Engineering) of this chapter. (b) Installation of propulsion machinery of an unusual... requirements as determined necessary by the cognizant OCMI. Unusual types of propulsion machinery include: (1...
46 CFR 119.220 - Installations.
Code of Federal Regulations, 2014 CFR
2014-10-01
... PASSENGERS OR WITH OVERNIGHT ACCOMMODATIONS FOR MORE THAN 49 PASSENGERS MACHINERY INSTALLATION Propulsion... subchapter J (Electrical Engineering) of this chapter. (b) Installation of propulsion machinery of an unusual... requirements as determined necessary by the cognizant OCMI. Unusual types of propulsion machinery include: (1...
NASA Astrophysics Data System (ADS)
Neumann, K.; Dowling, C.; Florea, L.; Dunn, M.; Samuelson, A. C.; Lowe, J.
2013-12-01
Ball State University (BSU), located within the city of Muncie, Indiana, began installing the nation's largest ground-source geothermal project in 2009. Currently, BSU is burning over 20,000 tons of coal annually to satisfy heating and cooling demands of the school and is one of the largest emitters of CO2, SO2 and mercury in the city of Muncie and surrounding Delaware County. The elimination of coal burning will reduce aerial pollution by an estimated 1400 tons of SO2 and 4 pounds of mercury annually, once the system is fully operational. Currently, the groundsource geothermal system is being installed in Phases. Phase 1 includes 1803 400-ft deep geothermal boreholes that were drilled in a 15x15 ft grid in two large fields (North and South) in the northern part of campus. Two geothermal exchange loops were installed in each borehole to add or remove heat from the ground. BSU students and faculty collected hydrogeologic and temperature data from a series of groundwater monitoring wells, beginning Summer 2010. The installation of the second phase in the southern part of campus has commenced.. Despite the rise in community-scale ground-source geothermal energy systems, there is very little empirical information on their effects upon the groundwater environment, or, vice versa, of the effects of the groundwater flow pattern on the geothermal field. Previous studies have triggered concern over the impact of large-scale geothermal systems where increases in groundwater temperatures were documented. We will demonstrate how, since BSU initiated Phase 1 in late November 2011 with cold-water circulation (adding heat to the ground), the temperature increased over 10 degrees Celsius in the center of the South Field, with temperatures rising in other surrounding monitoring wells depending on groundwater movement and their distance from the edge of the geothermal boreholes. The temperature increases are distinctively different in the upper highly hydraulically conductive aquifers (Quaternary till) and the underlying poorly conductive formations (Ordovician and Silurian limestone and shale). Maintaining a temperature differential between the exchange loops and the geologic substrate and/or groundwater is crucial to the long term efficiency of the system, and continued monitoring both of the hydrology and engineering aspects of the project will be necessary.
SIMS prototype system 1 test results: Engineering analysis
NASA Technical Reports Server (NTRS)
1978-01-01
The space and domestic water solar heating system designated SIMS Prototype Systems 1 was evaluated. The test system used 720 ft (gross) of Solar Energy Products Air Collectors, a Solar Control Corporation SAM 20 Air Handler with Model 75-175 control unit, a Jackson Solar Storage tank with Rho Sigma Mod 106 controller, and 20 tons of rack storage. The test data analysis performed evaluates the system performance and documents the suitability of SIMS Prototype System 1 hardware for field installation.
Electroplating wastes in marine environments: A case history at Quonset Point, Rhode Island
Eisler, Ronald; Hoffman, David J.; Rattner, Barnett A.; Burton, G. Allen; Cairns, John
1995-01-01
All U.S. Navy electroplating and metal-finishing wastes are now required to pass through industrial-wastewater treatment plants and other treatment facilities for the removal of heavy metals and other potentially hazardous materials. In 1984 a total of 235,191 metric tons (t) of electroplating and metal-finishing wastes from 70 U.S. Navy installations - primarily shipyards, aviation depots, air stations, and weapons plants - were treated.1 Electroplating wastes were not always fully treated.
MS Lu installs the TVIS equipment in Zvezda during STS-106
2000-09-16
STS106-390-024 (8-20 September 2000) --- Astronaut Edward T. Lu, mission specialist, handles part of the treadmill device on the Service Module for the International Space Station. The crew left this and a large number of other items of hardware and supplies for future inhabitants of the station. Lu and four other astronauts, along with two cosmonauts, are wrapping up a 4.9 million-mile mission in which more than three tons of equipment were delivered to the International outpost.
Current State of Military Hybrid Vehicle Development
2011-01-01
programme were: • EP-50 parallel hybrid light armoured vehicle (LAV-III) and a refuse hauler • advanced hybrid electric drive (AHED) 8 × 8, 20 ton...Qingnian, W., Liang, C. and Weihua, W. (2003) ‘Energy management strategy and parametric design for hybrid electric military vehicle’, SAE Paper No...herein do not necessarily state or reflect those of the US Government or the DoA, and shall not be used for advertising or product endorsement purposes. 2 Unclassified. Distribution Statement A. Approved for public release.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Couch, R.W.; Deacon, R.J.
1973-09-30
This report defines a procedure and provides basic information needed to determine the modifications required to make electrical substations and special installations of the Bonneville Power Administration (BPA) more resistant to strong earthquake ground motion. It also provides a procedure for developing an effective plan for establishing the sequence, or priority, of providing the required modifications.
Circuits Protect Against Incorrect Power Connections
NASA Technical Reports Server (NTRS)
Delombard, Richard
1992-01-01
Simple circuits prevent application of incorrectly polarized or excessive voltages. Connected temporarily or permanently at power-connecting terminals. Devised to protect electrical and electronic equipment installed in spacecraft and subjected to variety of tests in different facilities prior to installation. Basic concept of protective circuits also applied easily to many kinds of electrical and electronic equipment that must be protected against incorrect power connections.
Xenon Acquisition Strategies for High-Power Electric Propulsion NASA Missions
NASA Technical Reports Server (NTRS)
Herman, Daniel A.; Unfried, Kenneth G.
2015-01-01
Solar electric propulsion (SEP) has been used for station-keeping of geostationary communications satellites since the 1980s. Solar electric propulsion has also benefitted from success on NASA Science Missions such as Deep Space One and Dawn. The xenon propellant loads for these applications have been in the 100s of kilograms range. Recent studies performed for NASA's Human Exploration and Operations Mission Directorate (HEOMD) have demonstrated that SEP is critically enabling for both near-term and future exploration architectures. The high payoff for both human and science exploration missions and technology investment from NASA's Space Technology Mission Directorate (STMD) are providing the necessary convergence and impetus for a 30-kilowatt-class SEP mission. Multiple 30-50- kilowatt Solar Electric Propulsion Technology Demonstration Mission (SEP TDM) concepts have been developed based on the maturing electric propulsion and solar array technologies by STMD with recent efforts focusing on an Asteroid Redirect Robotic Mission (ARRM). Xenon is the optimal propellant for the existing state-of-the-art electric propulsion systems considering efficiency, storability, and contamination potential. NASA mission concepts developed and those proposed by contracted efforts for the 30-kilowatt-class demonstration have a range of xenon propellant loads from 100s of kilograms up to 10,000 kilograms. This paper examines the status of the xenon industry worldwide, including historical xenon supply and pricing. The paper will provide updated information on the xenon market relative to previous papers that discussed xenon production relative to NASA mission needs. The paper will discuss the various approaches for acquiring on the order of 10 metric tons of xenon propellant to support potential near-term NASA missions. Finally, the paper will discuss acquisitions strategies for larger NASA missions requiring 100s of metric tons of xenon will be discussed.
Control of Bethlehem's coke-oven battery A at Sparrow Point
DOE Office of Scientific and Technical Information (OSTI.GOV)
Michel, A.
1984-02-01
A new 6 m 80-oven compound-fired coke battery capable of producing in excess of 850,000 ton/year began production at Sparrow Point, Maryland, in 1982. The electrical, fuel distribution and control systems are described, together with the computer process control and monitoring systems.
40 CFR 98.177 - Records that must be retained.
Code of Federal Regulations, 2011 CFR
2011-07-01
...) Production capacity (in metric tons per year) for the production of taconite pellets, coke, sinter, iron, and...-recovery coke oven battery, sinter process, electric arc furnace, decarburization vessel, and direct... of coal charged to the coke ovens (e.g., weigh belts, a combination of measuring volume and bulk...
40 CFR 98.177 - Records that must be retained.
Code of Federal Regulations, 2013 CFR
2013-07-01
...) Production capacity (in metric tons per year) for the production of taconite pellets, coke, sinter, iron, and...-recovery coke oven battery, sinter process, electric arc furnace, decarburization vessel, and direct... of coal charged to the coke ovens (e.g., weigh belts, a combination of measuring volume and bulk...
40 CFR 98.177 - Records that must be retained.
Code of Federal Regulations, 2012 CFR
2012-07-01
...) Production capacity (in metric tons per year) for the production of taconite pellets, coke, sinter, iron, and...-recovery coke oven battery, sinter process, electric arc furnace, decarburization vessel, and direct... of coal charged to the coke ovens (e.g., weigh belts, a combination of measuring volume and bulk...
40 CFR 98.177 - Records that must be retained.
Code of Federal Regulations, 2014 CFR
2014-07-01
...) Production capacity (in metric tons per year) for the production of taconite pellets, coke, sinter, iron, and...-recovery coke oven battery, sinter process, electric arc furnace, decarburization vessel, and direct... of coal charged to the coke ovens (e.g., weigh belts, a combination of measuring volume and bulk...
46 CFR 176.700 - Permission for repairs and alterations.
Code of Federal Regulations, 2012 CFR
2012-10-01
... repair or replacement, other than replacement in kind, of electrical wiring, fuel lines, tanks, boilers... 46 Shipping 7 2012-10-01 2012-10-01 false Permission for repairs and alterations. 176.700 Section... (UNDER 100 GROSS TONS) INSPECTION AND CERTIFICATION Repairs and Alterations § 176.700 Permission for...
46 CFR 176.700 - Permission for repairs and alterations.
Code of Federal Regulations, 2013 CFR
2013-10-01
... repair or replacement, other than replacement in kind, of electrical wiring, fuel lines, tanks, boilers... 46 Shipping 7 2013-10-01 2013-10-01 false Permission for repairs and alterations. 176.700 Section... (UNDER 100 GROSS TONS) INSPECTION AND CERTIFICATION Repairs and Alterations § 176.700 Permission for...
46 CFR 176.700 - Permission for repairs and alterations.
Code of Federal Regulations, 2014 CFR
2014-10-01
... repair or replacement, other than replacement in kind, of electrical wiring, fuel lines, tanks, boilers... 46 Shipping 7 2014-10-01 2014-10-01 false Permission for repairs and alterations. 176.700 Section... (UNDER 100 GROSS TONS) INSPECTION AND CERTIFICATION Repairs and Alterations § 176.700 Permission for...
46 CFR 176.700 - Permission for repairs and alterations.
Code of Federal Regulations, 2011 CFR
2011-10-01
... repair or replacement, other than replacement in kind, of electrical wiring, fuel lines, tanks, boilers... 46 Shipping 7 2011-10-01 2011-10-01 false Permission for repairs and alterations. 176.700 Section... (UNDER 100 GROSS TONS) INSPECTION AND CERTIFICATION Repairs and Alterations § 176.700 Permission for...
Under the auspices of the Superfund Innovative Technology Evaluation or SITE Program, a critical assessment is made of the performance of the transportable Shirco Infrared Thermal Destruction System during three separate test runs at an operating feed rate of 100 tons per day. Th...
46 CFR 176.700 - Permission for repairs and alterations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... repair or replacement, other than replacement in kind, of electrical wiring, fuel lines, tanks, boilers... 46 Shipping 7 2010-10-01 2010-10-01 false Permission for repairs and alterations. 176.700 Section... (UNDER 100 GROSS TONS) INSPECTION AND CERTIFICATION Repairs and Alterations § 176.700 Permission for...
46 CFR 113.25-1 - Applicability.
Code of Federal Regulations, 2011 CFR
2011-10-01
... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING COMMUNICATION AND ALARM... §§ 113.25-25 and 113.25-30, applies to each manned vessel of over 100 gross tons, except barges, scows, and similar vessels. (b) Section 113.25-25 applies to each manned ocean and coastwise barge of over...
46 CFR 113.25-1 - Applicability.
Code of Federal Regulations, 2013 CFR
2013-10-01
... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING COMMUNICATION AND ALARM... §§ 113.25-25 and 113.25-30, applies to each manned vessel of over 100 gross tons, except barges, scows, and similar vessels. (b) Section 113.25-25 applies to each manned ocean and coastwise barge of over...
46 CFR 113.25-1 - Applicability.
Code of Federal Regulations, 2010 CFR
2010-10-01
... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING COMMUNICATION AND ALARM... §§ 113.25-25 and 113.25-30, applies to each manned vessel of over 100 gross tons, except barges, scows, and similar vessels. (b) Section 113.25-25 applies to each manned ocean and coastwise barge of over...
46 CFR 113.25-1 - Applicability.
Code of Federal Regulations, 2012 CFR
2012-10-01
... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING COMMUNICATION AND ALARM... §§ 113.25-25 and 113.25-30, applies to each manned vessel of over 100 gross tons, except barges, scows, and similar vessels. (b) Section 113.25-25 applies to each manned ocean and coastwise barge of over...
46 CFR 113.25-1 - Applicability.
Code of Federal Regulations, 2014 CFR
2014-10-01
... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING COMMUNICATION AND ALARM... §§ 113.25-25 and 113.25-30, applies to each manned vessel of over 100 gross tons, except barges, scows, and similar vessels. (b) Section 113.25-25 applies to each manned ocean and coastwise barge of over...
24 CFR 3285.701 - Electrical crossovers.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 24 Housing and Urban Development 5 2011-04-01 2011-04-01 false Electrical crossovers. 3285.701... URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Electrical Systems and Equipment § 3285.701 Electrical crossovers. Multi-section homes with electrical wiring in more than one section require...
24 CFR 3285.701 - Electrical crossovers.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 24 Housing and Urban Development 5 2013-04-01 2013-04-01 false Electrical crossovers. 3285.701... URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Electrical Systems and Equipment § 3285.701 Electrical crossovers. Multi-section homes with electrical wiring in more than one section require...
24 CFR 3285.701 - Electrical crossovers.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 24 Housing and Urban Development 5 2014-04-01 2014-04-01 false Electrical crossovers. 3285.701... URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Electrical Systems and Equipment § 3285.701 Electrical crossovers. Multi-section homes with electrical wiring in more than one section require...
24 CFR 3285.701 - Electrical crossovers.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 24 Housing and Urban Development 5 2012-04-01 2012-04-01 false Electrical crossovers. 3285.701... URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Electrical Systems and Equipment § 3285.701 Electrical crossovers. Multi-section homes with electrical wiring in more than one section require...
Method for efficient recovery of high-purity polycarbonates from electronic waste.
Weeden, George S; Soepriatna, Nicholas H; Wang, Nien-Hwa Linda
2015-02-17
More than one million tons of polycarbonates from waste electrical and electronic equipment are consigned to landfills at an increasing rate of 3-5% per year. Recycling the polymer waste should have a major environmental impact. Pure solvents cannot be used to selectively extract polycarbonates from mixtures of polymers with similar properties. In this study, selective mixed solvents are found using guidelines from Hansen solubility parameters, gradient polymer elution chromatography, and solubility tests. A room-temperature sequential extraction process using two mixed solvents is developed to recover polycarbonates with high yield (>95%) and a similar purity and molecular weight distribution as virgin polycarbonates. The estimated cost of recovery is less than 30% of the cost of producing virgin polycarbonates from petroleum. This method would potentially reduce raw materials from petroleum, use 84% less energy, reduce emission by 1-6 tons of CO2 per ton of polycarbonates, and reduce polymer accumulation in landfills and associated environmental hazards.
24 CFR 3280.708 - Exhaust duct system and provisions for the future installation of a clothes dryer.
Code of Federal Regulations, 2010 CFR
2010-04-01
...(a)(1) through (5). (c) Provisions for future installation of electric clothes dryers. When wiring is... for the future installation of a clothes dryer. 3280.708 Section 3280.708 Housing and Urban... duct system and provisions for the future installation of a clothes dryer. (a) Clothes dryers. (1) All...
Emissions of polycyclic aromatic hydrocarbons from batch hot mix asphalt plants.
Lee, Wen-Jhy; Chao, Wen-Hui; Shih, Minliang; Tsai, Cheng-Hsien; Chen, Thomas Jeng-Ho; Tsai, Perng-Jy
2004-10-15
This study was set out to assess the characteristics of polycyclic aromatic hydrocarbon (PAH) emissions from batch hot mix asphalt (HMA) plants and PAH removal efficiencies associated with their installed air pollution control devices. Field samplings were conducted on six randomly selected batch HMA plants. For each selected plant, stack flue gas samples were collected from both stacks of the batch mixer (n = 5) and the preheating boiler (n = 5), respectively. PAH samples were also collected from the field to assess PAHs that were directly emitted from the discharging chute (n = 3). To assess PAH removal efficiencies of the installed air pollution control devices, PAH contents in both cyclone fly ash (n=3) and bag filter fly ash (n = 3) were analyzed. Results show that the total PAH concentration (mean; RSD) in the stack flue gas of the batch mixer (354 microg/Nm3; 78.5%) was higher than that emitted from the discharging chute (107 microg/Nm3; 70.1%) and that in the stack flue gas of the preheating boiler (83.7 microg/Nm3; 77.6%). But the total BaPeq concentration of that emitted from the discharging chute (0.950 microg/Nm3; 84.4%) was higher than contained in the stack flue gas of the batch mixer (0.629 microg/Nm3; 86.8%) and the stack flue gas of the preheating boiler (= 0.112 microg/Nm3; 80.3%). The mean total PAH emission factor for all selected batch mix plants (= 139 mg/ton x product) was much higher than that reported by U.S. EPA for the drum mix asphalt plant (range = 11.8-79.0 mg/ton x product). We found the overall removal efficiency of the installed air pollution control devices (i.e., cyclone + bag filter) on total PAHs and total BaPeq were 22.1% and 93.7%, respectively. This implies that the installed air pollution control devices, although they have a very limited effect on the removal of total PAHs, do significantly reduce the carcinogenic potencies associated with PAH emissions from batch HMA plants.
Improving Energy Security for Air Force Installations
NASA Astrophysics Data System (ADS)
Schill, David
Like civilian infrastructure, Air Force installations are dependent on electrical energy for daily operations. Energy shortages translate to decreased productivity, higher costs, and increased health risks. But for the United States military, energy shortages have the potential to become national security risks. Over ninety-five percent of the electrical energy used by the Air Force is supplied by the domestic grid, which is susceptible to shortages and disruptions. Many Air Force operations require a continuous source of energy, and while the Air Force has historically established redundant supplies of electrical energy, these back-ups are designed for short-term outages and may not provide sufficient supply for a longer, sustained power outage. Furthermore, it is the goal of the Department of Defense to produce or procure 25 percent of its facility energy from renewable sources by fiscal year 2025. In a government budget environment where decision makers are required to provide more capability with less money, it is becoming increasingly important for informed decisions regarding which energy supply options bear the most benefit for an installation. The analysis begins by exploring the field of energy supply options available to an Air Force installation. The supply options are assessed according to their ability to provide continuous and reliable energy, their applicability to unique requirements of Air Force installations, and their costs. Various methods of calculating energy usage by an installation are also addressed. The next step of this research develops a methodology and tool which assesses how an installation responds to various power outage scenarios. Lastly, various energy supply options are applied to the tool, and the results are reported in terms of cost and loss of installation capability. This approach will allow installation commanders and energy managers the ability to evaluate the cost and effectiveness of various energy investment options.
Xenon Acquisition Strategies for High-Power Electric Propulsion NASA Missions
NASA Technical Reports Server (NTRS)
Herman, Daniel A.; Unfried, Kenneth G.
2015-01-01
The benefits of high-power solar electric propulsion (SEP) for both NASA's human and science exploration missions combined with the technology investment from the Space Technology Mission Directorate have enabled the development of a 50kW-class SEP mission. NASA mission concepts developed, including the Asteroid Redirect Robotic Mission, and those proposed by contracted efforts for the 30kW-class demonstration have a range of xenon propellant loads from 100's of kg up to 10,000 kg. A xenon propellant load of 10 metric tons represents greater than 10% of the global annual production rate of xenon. A single procurement of this size with short-term delivery can disrupt the xenon market, driving up pricing, making the propellant costs for the mission prohibitive. This paper examines the status of the xenon industry worldwide, including historical xenon supply and pricing. The paper discusses approaches for acquiring on the order of 10 MT of xenon propellant considering realistic programmatic constraints to support potential near-term NASA missions. Finally, the paper will discuss acquisitions strategies for mission campaigns utilizing multiple high-power solar electric propulsion vehicles requiring 100's of metric tons of xenon over an extended period of time where a longer term acquisition approach could be implemented.
Fluid assisted installation of electrical cable accessories
Mayer, Robert W.; Silva, Frank A.
1977-01-01
An electrical cable accessory includes a generally tubular member of elastomeric material which is to be installed by placement over a cylindrical surface to grip the cylindrical surface, when in appropriate assembled relation therewith, with a predetermined gripping force established by dilation of the tubular member, the installation being facilitated by introducing fluid under pressure, through means provided in the tubular member, between the tubular member and the cylindrical surface, and simultaneously impeding the escape of the fluid under pressure from between the tubular member and the cylindrical surface by means adjacent one of the ends of the tubular member to cause dilation of the tubular member and establish a fluid layer between the tubular member and the cylindrical surface, thereby reducing the gripping force during installation.
USA's Black Thunder mine: a truck and shovel operation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dorling, I.
During 1966/1967, ARCO obtained over 2,631 hectares (6,500 acres) of federal and state coal leases, and initial exploration was started. A total of 312 coal core holes were drilled and logged to determine the reserves and quality of the coal. The results indicated that a large surface mine could be developed to exploit the substantial reserves. The application procedure for permits was started early in 1974. Thunder Basin Coal Company is mining the Wyodak-Anderson Seam where the coal is about 21 meters (69 feet) thick. It has been estimated that a total of 750,000,000 tons of coal exist with amore » 0.3 to 0.4 percent sulfur content and a heating value of about 8,600 Btu per pound. The seam is mined in one lift using electric shovels and trucks. There are many factors which govern the choice of either a dragline or a truck and shovel operation for removing overburden. At the Black Thunder mine the conditions which favored the choice of the truck and shovel method were topography and pit geometry. The run-of-mine coal is dumped into two 540-ton hoppers. Underground vibrating grizzly feeders (2,500 tph capacity) pass the coal into 2,500 tph primary single-roll crushers, where the ROM coal is reduced to minus 8 inches. A 72-inch-wide elevating conveyor carries the coal to a 110-ton surge hopper, and is then fed into two secondary crushers where the coal is further reduced to minus-2 inches. The system is able to handle 5,000 tons of ROM coal per hour. The total production of coal from the mine in 1978 is expected to be about 3,000,000 tons, depending on customer requirements. It is expected that in 1979 the output will rise to 8,000,000 tons, and by 1983 the full planned production of 20,000,000 tons a year will be reached. (LTN)« less
Electric Vehicle Charging Stations as a Climate Change Mitigation Strategy
NASA Technical Reports Server (NTRS)
Cave, Bridget; DeYoung, Russell J.
2014-01-01
In order to facilitate the use of electric vehicles at NASA Langley Research Center (LaRC), charging stations should be made available to LaRC employees. The implementation of charging stations would decrease the need for gasoline thus decreasing CO2 emissions improving local air quality and providing a cost savings for LaRC employees. A charging station pilot program is described that would install stations as the need increased and also presents a business model that pays for the electricity used and installation at no cost to the government.
ERIC Educational Resources Information Center
Onweh, Vincent E.; Akpan, Udeme Timothy
2014-01-01
The study investigated the effects of instructional strategies on students' academic performance in Electrical Installation in Technical Colleges in Akwa Ibom State. Instructional skills are the most specific category of teaching behaviours. A non-equivalent control group quasi experimental design was adopted for the study. Four intact classes…
Solar power for energy sustainability and environmental friendliness of Curtin University Sarawak
NASA Astrophysics Data System (ADS)
Palanichamy, C.; Goh, Alvin
2016-03-01
The demand on electrical energy is rapidly increasing. Everything around us requires electrical energy either during its production or usage stage. Sustainability has become the main concern nowadays as the availability of fossil fuels is limited. As renewable energy is the path-way to energy sustainability and environmental friendly environment, this paper proposes a solar power system for Curtin University Sarawak to reduce its electricity consumption and greenhouse gas emissions. The proposed 208 kW solar system saves an energy consumption of more than 380,000 kWh per year, and a CO2 offset by 285 Tons per year
Co-digestion of organic solid waste and sludge from sewage treatment.
Edelmann, W; Engeli, H; Gradenecker, M
2000-01-01
Solid organic wastes were codigested together with sludge of a sewage treatment plant (STP). In the practical part of the study, a plant to pretreat the organic solid wastes provided by local super markets was constructed at the STP of Frutigen, Switzerland. Up to more than 1 cubic metre of wastes was added to the fermenter of the STP every day. Data collected during 14 months of practical works, showed that for raw fruit and vegetable wastes a two step pretreatment is necessary: First the wastes were chopped and afterwards reduced to a size of 1-2 millimetres, in order to get a homogeneous suspension together with the primary sludge. The vegetable wastes showed excellent digestibility: They seemed to accelerate the digestion process as well as to increase the degree of the anaerobic degradation of the sludge. The energy demand for both, pretreatment and digestion, was 85 kWh/ton of fresh wastes. 20% of the energy was used for the hygienization, a step which does not seem to be necessary for this kind of waste in most of the cases, however. After using the gas for energy conversion, a net yield of 65 kWh/ton of electricity and 166 kWh/ton of heat was measured. Treating cooked kitchen wastes, the net energy production will be higher, because in this case a one step pretreatment will be sufficient. The pretreatment and treatment costs for codigestion on STP's were calculated to be in the range of 55 US$/ton treating half a ton per day and 39 US$/ton treating one ton, respectively. A theoretical feasibility study showed that in Switzerland there is a short term potential on STP's for the codigestion of about 120,000 tons of biogenic wastes per year without big investments. Economic studies about codigestion on agricultural biogas plants showed that the codigestion is a must at the current energy prices, which are far too low for agricultural AD without an additional income by treating solid wastes for third parties.
33 CFR 159.71 - Electrical controls and conductors.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 33 Navigation and Navigable Waters 2 2013-07-01 2013-07-01 false Electrical controls and... Electrical controls and conductors. Electrical controls and conductors must be installed in accordance with good marine practice. Wire must be copper and must be stranded. Electrical controls and conductors must...
33 CFR 159.71 - Electrical controls and conductors.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 33 Navigation and Navigable Waters 2 2012-07-01 2012-07-01 false Electrical controls and... Electrical controls and conductors. Electrical controls and conductors must be installed in accordance with good marine practice. Wire must be copper and must be stranded. Electrical controls and conductors must...
33 CFR 159.71 - Electrical controls and conductors.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 33 Navigation and Navigable Waters 2 2014-07-01 2014-07-01 false Electrical controls and... Electrical controls and conductors. Electrical controls and conductors must be installed in accordance with good marine practice. Wire must be copper and must be stranded. Electrical controls and conductors must...
Environmental and economic vision of plasma treatment of waste in Makkah
NASA Astrophysics Data System (ADS)
Galaly, Ahmed Rida; van Oost, Guido
2017-10-01
An environmental and economic assessment of the development of a plasma-chemical reactor equipped with plasma torches for the environmentally friendly treatment of waste streams by plasma is outlined with a view to the chemical and energetic valorization of the sustainability in the Kingdom of Saudi Arabia (KSA). This is especially applicable in the pilgrimage season in the city of Makkah, which is a major challenge since the amount of waste was estimated at about 750 thousand tons through Arabic Year 1435H (2015), and is growing at a rate of 3%-5% annually. According to statistics, the value of waste in Saudi Arabia ranges between 8 and 9 billion EUR. The Plasma-Treatment Project (PTP) encompasses the direct plasma treatment of all types of waste (from source and landfill), as well as an environmental vision and economic evaluation of the use of the gas produced for fuel and electricity production in KSA, especially in the pilgrimage season in the holy city Makkah. The electrical power required for the plasma-treatment process is estimated at 5000 kW (2000 kW used for the operation of the system and 3000 kW sold), taking into account the fact that: (1) the processing capacity of solid waste is 100 tons per day (2) and the sale of electricity amounts to 23.8 MW at 0.18 EUR per kWh. (3) The profit from the sale of electricity per year is estimated at 3.27 million EUR and the estimated profit of solid-waste treatment amounts to 6 million EUR per year and (4) the gross profit per ton of solid waste totals 8 million EUR per year. The present article introduces the first stage of the PTP, in Makkah in the pilgrimage season, which consists of five stages: (1) study and treatment of waste streams, (2) slaughterhouse waste treatment, (3) treatment of refuse-derived fuel, (4) treatment of car tires and (5) treatment of slag (the fifth stage associated with each stage from the four previous stages).
The role of capital costs in decarbonizing the electricity sector
NASA Astrophysics Data System (ADS)
Hirth, Lion; Steckel, Jan Christoph
2016-11-01
Low-carbon electricity generation, i.e. renewable energy, nuclear power and carbon capture and storage, is more capital intensive than electricity generation through carbon emitting fossil fuel power stations. High capital costs, expressed as high weighted average cost of capital (WACC), thus tend to encourage the use of fossil fuels. To achieve the same degree of decarbonization, countries with high capital costs therefore need to impose a higher price on carbon emissions than countries with low capital costs. This is particularly relevant for developing and emerging economies, where capital costs tend to be higher than in rich countries. In this paper we quantitatively evaluate how high capital costs impact the transformation of the energy system under climate policy, applying a numerical techno-economic model of the power system. We find that high capital costs can significantly reduce the effectiveness of carbon prices: if carbon emissions are priced at USD 50 per ton and the WACC is 3%, the cost-optimal electricity mix comprises 40% renewable energy. At the same carbon price and a WACC of 15%, the cost-optimal mix comprises almost no renewable energy. At 15% WACC, there is no significant emission mitigation with carbon pricing up to USD 50 per ton, but at 3% WACC and the same carbon price, emissions are reduced by almost half. These results have implications for climate policy; carbon pricing might need to be combined with policies to reduce capital costs of low-carbon options in order to decarbonize power systems.
Code of Federal Regulations, 2011 CFR
2011-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-1 General. (a) Electric installations on vessels must ensure: (1) Maintenance of services... persons, and the vessel from electrical hazards. (3) Maintenance of system integrity through compliance...
46 CFR 110.30-5 - Inspection for certification.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING GENERAL PROVISIONS Testing and Inspection § 110.30-5 Inspection for certification. Electric installations and electric... mechanical and electrical condition and performance. Particular note must be made of circuits added or...
46 CFR 110.30-5 - Inspection for certification.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING GENERAL PROVISIONS Testing and Inspection § 110.30-5 Inspection for certification. Electric installations and electric... mechanical and electrical condition and performance. Particular note must be made of circuits added or...
Code of Federal Regulations, 2014 CFR
2014-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-1 General. (a) Electric installations on vessels must ensure: (1) Maintenance of services... persons, and the vessel from electrical hazards. (3) Maintenance of system integrity through compliance...
Code of Federal Regulations, 2010 CFR
2010-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-1 General. (a) Electric installations on vessels must ensure: (1) Maintenance of services... persons, and the vessel from electrical hazards. (3) Maintenance of system integrity through compliance...
46 CFR 110.30-5 - Inspection for certification.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING GENERAL PROVISIONS Testing and Inspection § 110.30-5 Inspection for certification. Electric installations and electric... mechanical and electrical condition and performance. Particular note must be made of circuits added or...
29 CFR 1926.404 - Wiring design and protection.
Code of Federal Regulations, 2013 CFR
2013-07-01
... tracks of electrically operated cranes; frames of nonelectrically driven elevator cars to which electric..., DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Electrical Installation Safety... conductors, transformers, or other electric equipment, unless such equipment is controlled by a disconnecting...
29 CFR 1926.404 - Wiring design and protection.
Code of Federal Regulations, 2012 CFR
2012-07-01
... tracks of electrically operated cranes; frames of nonelectrically driven elevator cars to which electric..., DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Electrical Installation Safety... conductors, transformers, or other electric equipment, unless such equipment is controlled by a disconnecting...
A Greenhouse for Mars and Beyond
NASA Astrophysics Data System (ADS)
Rahaim, Christopher P.; Czysz, Paul A.
2008-01-01
A detailed design study for a deployable greenhouse for Mars mission is has been completed. The greenhouse has been designed so that it has a life span of at least 20 years, a leakage rate of no more that 1% of the total volume per day at the target working pressure of 50 kPa and provides at least six crewmembers with approximately twenty five percent of their food supply. Artificial light is provided by high intensity red and blue light emitting diodes, but sunlight is also used by installing small Lexan windows on the rooftop. The greenhouse structure is a rigid IM7/977-3 graphite/epoxy sandwich structure with a footprint of 38 m2. Radioisotope thermal electric generators are used to produce power for the greenhouse and its subsystems and the plants are grown in nested pockets located on vertical cylinders which allows for a growth area of 48 m2. An aeroponic water and nutrient delivery system is used in order to reduce the greenhouse water usage. Harvesting and planting is achieved through the use of robotics specifically designed for this mission. The greenhouse structure and subsystems have a total weight of less than 10 metric tons. In this paper the design highlights of several of the subsystems of the greenhouse design will be summarized.
49 CFR 393.30 - Battery installation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 5 2010-10-01 2010-10-01 false Battery installation. 393.30 Section 393.30... NECESSARY FOR SAFE OPERATION Lamps, Reflective Devices, and Electrical Wiring § 393.30 Battery installation. Every storage battery on every vehicle, unless located in the engine compartment, shall be covered by a...
46 CFR 169.609 - Exhaust systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 7 2010-10-01 2010-10-01 false Exhaust systems. 169.609 Section 169.609 Shipping COAST... Electrical Internal Combustion Engine Installations § 169.609 Exhaust systems. Engine exhaust installations... Yacht Council, Inc. Standard P-1, “Safe Installation of Exhaust Systems for Propulsion and Auxiliary...
49 CFR 393.30 - Battery installation.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 49 Transportation 5 2013-10-01 2013-10-01 false Battery installation. 393.30 Section 393.30... NECESSARY FOR SAFE OPERATION Lamps, Reflective Devices, and Electrical Wiring § 393.30 Battery installation. Every storage battery on every vehicle, unless located in the engine compartment, shall be covered by a...
49 CFR 393.30 - Battery installation.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 5 2011-10-01 2011-10-01 false Battery installation. 393.30 Section 393.30... NECESSARY FOR SAFE OPERATION Lamps, Reflective Devices, and Electrical Wiring § 393.30 Battery installation. Every storage battery on every vehicle, unless located in the engine compartment, shall be covered by a...
49 CFR 393.30 - Battery installation.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 49 Transportation 5 2014-10-01 2014-10-01 false Battery installation. 393.30 Section 393.30... NECESSARY FOR SAFE OPERATION Lamps, Reflective Devices, and Electrical Wiring § 393.30 Battery installation. Every storage battery on every vehicle, unless located in the engine compartment, shall be covered by a...
49 CFR 393.30 - Battery installation.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 49 Transportation 5 2012-10-01 2012-10-01 false Battery installation. 393.30 Section 393.30... NECESSARY FOR SAFE OPERATION Lamps, Reflective Devices, and Electrical Wiring § 393.30 Battery installation. Every storage battery on every vehicle, unless located in the engine compartment, shall be covered by a...